Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout187-095STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION pEC 1 ~ 2007 WELL COMPLETION OR RECOMPLETION REPORT AND LOG ~lasi~a Oil ~ Gas Cons. Comrt~issi~l~ 1a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended zoAAC zs.,os zoAac zs.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1b. Well Class: ®Development ^ Exploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 11!10/2007 12. Permit to Drill Number 187-095 307-245 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 09/10/1987 13. API Number 50-029-21752-00-00 4a. Location of Well (Governmental Section): Surface: ' F ' 7. Date T.D. Reached 09/26/1987 14. Well Name and Number: PBU K-14y 1909 NL, 4106 FEL, SEC. 04, T11N, R14E, UM Top of Productive Horizon: 2750' FNL, 3811' FEL, SEC. 09, T11 N, R14E, UM 8. KB (ft above MSL): 53.20' - Ground (ft MSL): 15. Field /Pool(s): , Prudhoe Bay Field / Prudhoe Bay Total Depth: 3356' FNL, 3870' FEL, SEC. 09, T11 N, R14E, UM 9. Plug Back Depth (MD+TVD) 11756 ~ 8964 Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 671441 y- 5975311 Zone- ASP4 10. Total Depth (MD+TVD) 11800' _ 8992' ' 16. Property Designation: ADL 028303 TPI: x- 671876 y- 5969200 Zone- ASP4 Total Depth: x- 671849 y- 5968592 Zone- ASP4 11. SSSV DeN A(MD+TVD) 17. Land Use Permit: 18. Directional Survey ^ Yes ®No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): DIL, BHCS, LDT / CNL-raw, Laserlog MWD Resisstivity & TVD 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FL GRADE TOP BOTTOM " TOP" BOTTOM.. SIZE CEMENTING RECORD PULLED 20" Conductor Surface 110' Surface 110' 8 cu ds Concrete 13-318" 72# L-80 / S-95 Surface 2720' Surface 2720' 17-1/2" 4185 cu ft Arctic Set II -5/ " 47# L-80 Surf 1083 ' Surfa 83 8' 12-1/4" 2375 cu Class'G' 7" 26# L-80 3968' 10467' 3611' 80 1' 8-1/2" 1095 cu ft Class'G' 7" 26# L-80 10567' 11800' 8151' 8892' 8-1l2" 414 cu ft Class'G' 23. Open to production or inject ion? ^ Yes ®No 24.- TuawG RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Slze and Number): SIZE DEPTH SET MD PACKER .SET MD None 4-1/2", 12.6#, 13Cr80 10435' 10348' MD TVD MD TVD 4-1/2", 12.6#, L-80 10463' - 10662' 10501' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. /~y~~ g`y (~ ~I~~~~ p~C ~ ~ ZOQ7 DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 11221' Set Whipstock P&A with 30 Bbls Class'G' below Whipstock 26. _ PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUfS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. Casing PreSS: CALCULATED 24-HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Cores Ac uired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. Otf,~il'~ETIO~ D None ~i`1~ y ~'(}}n({~}~ 1 // ~///~ I ?d ~~ 114.. ~~ l 4V Vl ~Ie~ ~f/ i t ~`',~% Form 10-407 Revised 02/2007 CONTINUED ON REVERSE .SIDE V 2>3~. GEOLOGIC MARKERS (LIST ALL FORMATIONS A KERS ENCOUNTERED): 29. FORMATION TESTS ' NAME MD TVD Well Teste ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. SAG 10868' 8365' None Shublik 10955' 8427' Zone 4 10982' 8446' (Top Ivishak Sadlerochit) Formation at Total Depth (Name): 30. List of Attachments: Pre Rig Work Summary, Summary of Daily Drilling Reports, Well Schematic Diagram. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Son Stewm ^,~~.. Title Drilling Technologist Date "" i ---~ PBU K-14 187-095 307-245 Prepared By NameMumber. Sondra Stewman, 564-4750 Well Number Drilling Engineer: Sean McLaughlin, 564-4387 Permit No. / A royal No. INSTRUCTIONS GeNeaA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Keily Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Irene 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only Digital Well File • • Page 1 of 2 Well: K-14 Well History Well Date K-14 9/5/2007 K-14 9/6/2007 K-14 Summary **`WELL S/I ON ARRIVAL"** (post nao/ pre ctd) JOB POSTPONED DUE TO CO-REP ***WELL S/I ON DEPARTURE*** (Pull BPV) Pulled CIW 4 1/16" Type "H" BPV "'JOB COMPLETE**' BPV left in hole after RWO on 08/14/07, Slickline P.E. called in. NOTE: Slickline up next. 9/6/2007 ***WELL S/1 ON ARRIVAL*'* (post naof pre ctd) ASSIST VECO IN REMOVING BPV. PULLED B&R FROM 10,376' SLM. PULLED STA# 4 DCR GLV @ 3416' SLM. SET RK-DGLV IN STA# 4 @ 3416' SLM. ***CONTINUED ON 9/7/07*** K-14 9/6/2007 Pulled 4" CIW for Post Rig K-14 9/7/2007 **`CONTINUED FROM 9/6/07*" (post rwo/ pre ctd) MIT-IA TO 3000, PASSED. BLED IA TO BACK TO 0 PSI. PULLED 4 1/2" RHC PLUG BODY @ 10,376' SLM. RAN 10' x 3" & 3.5" P-BAILERS MULTIPLE TIMES TO 10,580' SLM. RECOVER 1/2 GALLON OF RIG DEBRIS. SEE LOG FOR DETAIL. MADE 2 ATTEMPTS TO PULL XXN PLUG @ 10,580' SLM, UNABLE TO LATCH UP. ***CONTINUED ON 9/8/07 WSR*** K-14 9/8/2007 ***CONTINUED FROM 9/7/07*** (post rwo/ pre ctd) RAN 10' x 3" P-BAILER MULTIPLE TIMES TO 10,580' SLM, RECOVERED MUD AND METAL SHAVINGS. MADE 2 ATTEMPTS W/ 4.5" GR TO XXN PLUG @ 10,580' SLM, UNABLE TO LATCH. RAN 3.50" TAPERED LIB TO 10,580' SLM, MARKS INCONCLUSIVE. PLANTED RELEASABLE SPEAR IN XXN PLUG @ 10,580' SLM W/ 3.5" GR. PULLED XXN PLUG @ 10,580' SLM, POOH W/ PLUG IN PROGRESS. ***CONTINUED ON 9/9/07*** K-14 9/9/2007 ***CONTINUED FROM 9/8/07*** PULLED 4 1/2" XXN PLUG @ 10,580' MD. **FISH NECK WAS MILLED AWAY FROM RIG*** RAN 20' x 3.70" DMY WHIPSTOCK, SAT DOWN @ 10,454' SLM, APPEARS TO BE UNIQUE O-SHOT, UNABLE TO WORK PAST. RAN 3.80" SWEDGE, BRUSH, & 3.70" G-RING TO XN-NIP @ 10,580' SLM. SEE SLIGHT BOBBLE @ 10454' SLM, NEVER SAT DOWN. RE-RAN 20' x 3.70" DMY WHIPSTOCK, SAT DOWN AGAIN @ 10,454' SLM. UNABLE TO WORK PAST. RAN 5' x 3.80" BAR-BELL TO XN-NIP @ 10,580' SLM. NO PROBLEMS. RAN 10' x 3.80" BAR-BELL TO XN-NIP @ 10,580' SLM. NO PROBLEMS. ATTEMPTED DMY WHIPSTOCK AGAIN, STILL SITS DOWN @ 10,454' SLM. UNABLE TO WORK PAST. RIGGED DOWN. ***WELL LEFT S/l, PAD OP. NOTIFIED*** K-14 9/10/2007 *" WELL SI ON ARRIVAL*** DRIFTED W/ 17' X 3.65 O.D BAKER DUMMY PATCH DRIFT... UNABLE TO PASS 10,446' SLM DRIFTED W/ 10' X 3.70 O.D DUMMY WHIPSTOCK DRIFT... UNABLE TO PASS SAME SPOT @ 10,446' SLM. RDMO *** WELL LEFT SI, PAD OP NOTIFIED ON DEPARTURE *** K-14 9/15/2007 *"WELL SI ON ARRIVAL*** ON LOCATION TO VIDEO EVALUATE OBSTRUCTION AT 10446'. FLUID LEVEL DEPRESSED WITH N2. VIDEO PERFORMED IN GAS ENVIRONMENT POSSIBLE CEMENT SHEATH FOUND AT 10458'. LOG WITH VIDEO. POOH, RDMO. WELL LEFT SI, NOTIFY PAD OPERATOR FINAL WHP: 1500/250/0 ***JOB COMPLETE*** K-14 9/30/2007 CTU # 9 w/ 23/8" CT. Mill Cement Sheath and XN nipple. MIRU, perform BOP test. K-14 9/30/2007 CTU # 9 w/ 23/8" CT.MiII Cement Sheath and XN nipple. (Publish on Interact) M{RU. Perform BOP test........ http://digitalwellfile.bpweb.bp.com/WIInfo/Reports/ReportViewer.aspx 12/13/2007 Digital Well File • • Page 2 of 2 K-14 9/30/2007 CTU # 9 w/ 2 3/8" CT.MiII Cement Sheath and XN nipple. (Publish en Interact) MIRU. Perform BOP test. MU Left Hand 2 7/8" motor, 3.795" prabiloc DSM. Perform kill/fluid pack w/ 1 % KCL w/ safelube. Begin RIH. Continued on 10/1/07 WSR. K-14 9/30/2007 CTU # 9 w/ 2 3/8" CT.MiII Cement Sheath and XN nipple. (Publish on Interact) MIRU. Perform BOP test. MU Left Hand 2 7/8" motor, 3.795" prabiloc DSM. Perform kill/fluid pack w/ 1 %KCL w/ safelube. Begin RIH. Continued on 10/1/07 WSR. K-14 10/1/2007 Continued from 09/30/07 WSR. CTU #9, w/ 2 3/8" CT. Broadcasting. Complete killing/fluid packing well w/ 210 bbl. RIH w/ LH 3.795 DSM. Run through cement sheath, Dry tag XN nipple @ 10572' CTM. Begin milling from 10570'. Mill through XN w/ 2 stalls. Continue through tail. Make 3 passes between 10580' and 10400'. Good. Dry drift multiple passes from 10400'- 10580'. Make last mill pass down from 10400- 10580', dry drift up, good. POOH. MU &RIH 3 5/8" OD WS drift to 11,300'. POOH, freeze protect tubing to 2500' with 50/50 methanol. Leave well shut in. Drift portion of job complete. K-14 10/1/2007 Continued from 09/30/07 WSR. CTU #9, w/ 2 3/8" CT. Broadcasting. Complete killing/fluid packing well w/ 210 bbl. RIH w/ LH 3.795 DSM. Run through cement sheath, Dry tag XN nipple @ 10572' CTM. Begin milling from 10570'. Mill through XN w/ 2 stalls. Continue through tail. Make 3 passes between 10580' and 10400'. Good. Dry drift multiple passes from 10400'- 10580'. Make last mill pass down from 10400- 10580', dry drift up, good. POOH. K-14 10/6/2007 T/1/O = 420NACNAC. Temp = SI. Bleed WHPs to 0 psi (pre CTD). No flowline. Bled TBGP from 420 psi to 0+ psi in 1 hour 45 min. Final WHPs 0+/VACNAC. K-14 10/7/2007 T/IIO = SSVNACNAC. Temp = SI. Monitor (pre CTD). No flowline. IAP & OAP unchanged overnight. K-14 10/22/2007 T/I/0= 70/vac/vac. Temp= SI. Monitor WHPs (Pre-CTD). K-14 10/23/2007 T/I/0=70NacNac. Temp=Sl. Bleed TP to 0 psi (pre- CTD). TBG FL @ 36'. Bled TBGP to bleed tank from 70 psi to 0 psi in 30 min. Monitor for 30 minutes. TBGP increased to 45 psi. Bled TBGP from 45 psi to 0 psi in 15 min. Monitored 30 min. TBGP increased 45 psi. Bled TBGP to 0 psi in 15 min, maintained open bleed for 1 hr. Monitored 30 min. TBGP increased 20 psi. Bled TBGP to 0 psi in 15 min, maintained open bleed for 1 hr. Monitored 1 hr. TBGP increased 10 psi. Maintained open bleed for 2 hr. Monitored 1 hr. WHPs=O/VacNac. K-14 10/24/2007 T/I/0= ONACNAC. Temp= SI. Monitor WHP's (pre CTD). Well house and flowline removed. K-14 10/25/2007 Set 4" CIW "H" BPV. Print Date: 12/13/2007 Page 1 of 1 http://digitalwellfile.bpweb.bp.com/WIInfo/Reports/ReportViewer.aspx 12/13/2007 • L' BP.EXPLORATION. Page 1 of8 ..Operations Summary Report Legal Well Name: K-14 Common Well Name: K-14 Spud Date: 9/10/1987 Event Name: REENTER+COMPLETE Start: 11/7/2007 End: 11/17/2007 Contractor Name: NORDIC CALISTA Rig Release: 11/17/2007 Rig Name: NORDIC 1 Rig Number: N1 .Date From - To Hours Task Code NPT Phase Description of Operations 11/8/2007 11:00 - 14:00 3.00 MOB P PRE Prep rig to move to K-14A 14:00 - 14:30 0.50 MOB P PRE 14:30 - 15:30 1.00 MOB P PRE 15:30 - 16:00 0.50 MOB P PRE 16:00 - 20:00 4.00 MOB P PRE 20:00 - 20:30 0.50 MOB P PRE 20:30 - 00:00 3.50 BOPSU P PRE 11/9/2007 00:00 - 01:30 1.50 BOPSU P PRE 01:30 - 01:45 0.25 RIGU P PRE 01:45 - 02:50 1.08 RIGU P PRE 02:50 - 04:30 1.67 RIGU P PRE 04:30 - 04:40 0.17 RIGU P PRE 04:40 - 05:03 0.38 RIGU P PRE 05:03 - 05:30 0.45 RIGU P PRE 05:30 - 07:30 2.00 RIGU N PRE 07:30 - 08:30 1.00 RIGU P PRE 08:30 - 12:00 3.50 RIGU P PRE 12:00 - 12:25 0.42 STWHIP P WEXIT 12:25 - 12:45 0.33 ZONISO N WEXIT 12:45 - 12:55 0.17 ZONISO N WEXIT 12:55 - 13:10 0.25 ZONISO N WEXIT 13:10 - 15:00 1.83 ZONISO P WEXIT 15:00 - 16:40 1.67 ZONISO P WEXIT 16:40 - 17:00 0.33 ZONISO P WEXIT 17:00 - 18:22 1.37 ZONISO P WEXIT 18:22 - 19:55 1.55 ZONISO P WEXIT 19:55 - 20:10 0.25 ZONISO P WEXIT 20:10 - 00:00 3.83 ZONISO N WEXIT 11/10/2007 00:00 - 03:00 3.00 WHIP P WEXIT PJSM for rig move Move rig from K-08 to K-14 Align rig and spot over K-14 RIG ACCEPTED ON K-14A @ 16:00 Dress cellar, install hardline into reel, continue to spot equipment, remove tree cap, NU BPOE Fill stack, PJSM for BOPE testing BOPE test, 250 psi Low - 3500 psi High - AOGCC notified - witness test waived by Chuck Sheve BOPE Test 250 psi low / 3500 psi high PJSM for pulling coil from reel throught horses head and injector Pull coil to injector/ roller slightly out of adjustment, fix roller, cont. pulling coil through injector Stab into injector, stuffing box, connect hydraulic lines, recut coil, protect eline, pump 5 bbl McOH Filling coil Test inner reel valve Slack management, pumped 40 bbls, got it to move a couple times on first pump up at 4.2 bpm. Cut 55' of coil, 10' Eline Repair SLB injector packoff. Probably damaged by being pressurized, thinking coif was lower in the stuffing box then it actually was. RU and test lubricator to 1000 psi. Pull BPV. LD lubricator. Cut coil and E line. Megar E line. Install coil connector and pull test CTC. MU Baker MHA.MU nozzel. RIH wo pump to 2100' O-ring on injector leaking POH. Install new O ring. RIH to 2100'. Continue to RIH. No returns. until 10900' then only speratic returns. Up Wt at 11000'. 56K Continue RIH to 11700 Pump 5 bbl Hi Vis Bio pill . POH laying in 30 additional bbl of pill. Lost 60 bbl before we had fluid to surface.POH to 6600. Flo Check . A few burbs but no flo. POH to surface PU Baker Thru tubing Whipstock, CoilTrak Circulate 6bbl at surface before returns (Fluid level 260' down in 5-1/2" tubing). Repair SLB injector, 3 -SLB mechanics working to adjust gripper position and tension RIH with whipstock OA=O, IA= 0, WHP=44, PVT=218 bbl, 0.53 bpm in, 0.93 bpm out, tubing speed 85 fpm Printed: 12/4/2007 8:53:40 AM • BP EXPLORATION Page 2 of 8 Operations Summary Report Legal Well Name: K-14 Common Well Name: K-14 Spud Date: 9/10/1987 Event Name: REENTER+COMPLETE Start: 11/7/2007 End: 11/17/2007 Contractor Name: NORDIC CALISTA Rig Release: 11/17/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of operations 11/10/2007 03:00 - 03:22 0.37 WHIP P WEXIT Begin tie-in at 10,970 and end at 11,031. Add 5.5' to SLB coil depth measurement. RIH to 11237.5 (bottom of WS -length of WS 17.5- TOWS at 11220'MD') Circulating .5 bpm/900 psi. Orient WS to high side. Close EDC. Check up weight 03:22 - 03:43 0.35 WHIP P WEXIT Bring up pump to 3400 psi, pressure dropped to 2000 psi. Kill pump. Set down, tag WS. POOH seems to be pulling heavy. Pull up 150'. Decide to go back and tag TOWS. WS tagged spot on at 11220 with DWOB showing good set. 03:43 - 06:45 3.03 WHIP P WEXIT POOH pumping at tbpm, might be losing a 0.1 bpm, but hole looks pretty tight. PVT = 248 b, OA=O, IA=10, WHP=22, Cir Press 1176, pulling a bit heavy at 51 fpm ,(chrome tubing). POH to serface 06:45 - 07:30 0.75 WHIP P WEXIT LD WS setting tools. 07:30 - 09:00 1.50 WHIP P WEXIT LD Baker MHA.Cut coil due to flat spotting. Intatll new coil dimple connector. MU SLB wire Anchor. Pull test to 38K, PT to 4500 psi. 09:00 - 09:15 0.25 ZONISO P WEXIT MU cementing stinger. 09:15 - 11:30 2.25 ZONISO P WEXIT RIH.Tag WS @ 11221 and Paint flag. Up Wt 51 K. 11:30 - 11:45 0.25 ZONISO P WEXIT PJSM for cement job. 11:45 - 13:50 2.08 ZONISO P WEXIT Circulate .6 BPM @ 960 psi. Pump 5 bbl H2O. PT cementers to 3700 psi. Pump 30 bbl 1/1 returns. Pump 5 H2O. Swap to Bio. Displace with rig pump 2..37 bpm /2.34 bpm @ 2220 psi. Circulate to nozzel. Shut in backside Bullhead @ 2.25 bpm @ 2820 psi 13 bbl away WH Presssure increase to 2400-2600. After 28 bbl Open backside and circ 1.5 bpm @ 1400 psi, Lay in 2bbls PU to 10600'. Break circulation to assure well is fluid packed. Pressure well to 500 psi with 1.1 bbls Pressure well to 677 psi with 1.2 bbls Pressure well to 1177 psi with 1.9 bbls Pressure well to 1600 psi with 2.9 bbls Pressure well to bleed off to 1223 psi in 10 min. = 2.6 ppg EMW got back 1.9 bbls .One bbl squeezed away 13:50 - 15:10 1.33 ZONISO P WEXIT Wash to top of WS. Circualte bottoms up.2.52 bpm @ 2200 psi. TAg WS at 11221. 15:10 - 18:00 2.83 ZONISO P WEXIT POH 18:00 - 18:15 0.25 ZONISO P WEXIT Flo Check 18:15 - 19:25 1.17 ZONISO P WEXIT Lay out SLB wireline anchor, anchor screw stripped, tap out, cut 5' coil, MU SLB coil connector 19:25 - 20:42 1.28 ZONISO P WEXIT Headup eline coil, pump to assure coil not frozen, pressure test CT connector 20:42 - 21:40 0.97 STWHIP P WEXIT PU Milling BHA, Stab over well, Surface Test MWD 21:40 - 23:30 1.83 STWHIP P WEXIT RIH, PVT=273 bbl @ start of TIH, Tubing Speed = 107 fpm, flow in 0.26 bpm, flow out = .85 bpm, Cir Pressure = 635 psi, OA = 0, IA=4, wellhead pressure = 18. 23:30 - 23:48 0.30 STWHIP P WEXIT Tie-in with gamma-ray. PVT=331 bbl, Tubing Speed 2 fpm, flow in 0.22 bpm, flow out = .22 bpm, Cir press = 795, OA = 0, IA=O, wellhead pressure = 18 psi. Add 2.3' to SLB depth for tie-in. 23:48 - 00:00 0.20 STWHIP P WEXIT RIH to top of WS 11/11/2007 00:00 - 02:20 2.33 STWHIP P WEXIT Tag pinch point with low flow rate, PU 10', bring up pump to 2.7 bpm, Cir Press 2480 psi free spin, RIH 3 fpm, tag pinch point Printed: 12/4/2007 8:53:40 AM • BP EXPLORATION Page 3 of 8 Operations Summary Report Legal Well Name: K-14 Common Well Name: K-14 Spud Date: 9/10/1987 Event Name: REENTER+COMPLETE Start: 11/7/2007 End: 11/17/2007 Contractor Name: NORDIC CALISTA Rig Release: 11/17/2007 Rig Name: NORDIC 1 Rig Number: N1 Date From - To Hours Task Code NPT Phase Description of Operations 11111/2007 00:00 - 02:20 2.33 STWHIP P WEXIT @ 11,224.1' ,multiple tries w/ hard stalls (2500 up to 3800 psi) like hanging up uphole then release with a quick slide the last couple of feet down the whipstock. PVT = 328 bbl, IA=250 psi, OA=O psi, WHP=50 psi, Flow in 2.5 bpm, flow out 2.52 bpm 02:20 - 03:00 0.67 STWHIP P WEXIT Park at 11224.0 until DWOB starting to take a little weight so start of milling at 11224.1, free spin = 2660 psi, milling = 2780 psi. DWOB 0.64K Ib, PVT = 315 bbl, IA=262 psi, OA=O psi, WHP= 51 psi. 03:00 - 04:24 1.40 STWHIP P WEXIT Milling 11225.0 - 11226.0 MD, PVT=315 bbl., Cir press = 2812 psi, 2.72 bpm in, 2.77 bpm out, OA=O, IA=366, WHP= 51, DWOB increase from .64K to 2.5K over the 1' of milling. 04:24 - 05:32 1.13 STWHIP P WEXIT Milling 11226.0 - 11227.0, PVT=315 bbl., Cir press = 2809 psi, 2.72 bpm in, 2.77 bpm out, OA=O, IA=420, WHP= 48, DWOB 2.7K 05:32 - 06:25 0.88 STWHIP P WEXIT Milling 11227.0 - 11228.0, PVT=315 bbl., Cir press = 2809 psi, 2.72 bpm in, 2.77 bpm out, OA=O, IA=420, WHP= 48, DWOB 2.7K 06:25 - 07:00 0.58 STWHIP P WEXIT Milling 11228.0 - 11229.0, PVT=316 bbl., Cir press = 2870 psi, 2.72 bpm in, 2.77 bpm out, OA=O, IA=470, WHP= 48, DWOB 2.8K 07:00 - 11:00 4.00 STWHIP P WEXIT Milling 11230.0 - 11232, PVT=315 bbl., Cir press = 2830 psi, 2.75 bpm in, 2.77 bpm out, OA=O, IA=528, WHP= 48, DWOB 2.11 K Broke out in open hole at 11232. 11:00 - 13:00 2.00 STWHIP P WEXIT Drill 10 open hole .2.79/2.78 bpm at 3060 psi. Drill to 11244.7 13:00 - 14:15 1.25 STWHIP P WEXIT Backream to 11219. Three passed OK. 2.5/2.5 bpn at 2424psi. Shut down pump .Dry tag OK. 14:15 - 14:40 0.42 STWHIP P WEXIT Swap well to Flo Pro .Circulate Flo Pro to Bit. 14:40 - 17:00 2.33 STWHIP P WEXIT POH swapping to Flo Pro.POH to 1459' 17:00 - 17:20 0.33 STWHIP N RREP WEXIT Replace peanut on injector chain. 17:20 - 18:00 0.67 STWHIP P WEXIT Continue to POH to surface. 18:00 - 18:50 0.83 STWHIP P WEXIT LD window milling assy .Window mill 3.74 No Go, String mill 3.78 No Go. 18:50 - 22:00 3.17 STWHIP N SFAL WEXIT Tee off hydraulic pump line at SLB power pack to reel for greater volume, adjusting injector skates, pipe straightener and gooseneck, rotate stuffing box 180 degrees 22:00 - 22:45 0.75 DRILL P PROD1 MU Build BHA #5 with 4.125 BC bit, 3.1 degree mtr, coil trak tools, SLB dipple CTC 22:45 - 00:00 1.25 STWHIP N SFAL WEXIT Replacing sheared cotter pins on injector 11/12/2007 00:00 - 02:00 2.00 DRILL P PROD1 RIH with build BHA #5 to 10868' 02:00 - 03:50 1.83 DRILL P PROD1 Madd Pass and tie-in from 10868' to 11030' at 110fph, .53bpm, 1~l ~J~ ~ ~~ - (~ ~ 1200psi, Correction SLB .2', Baker .6' - 2.50 DRILL P PROD1 Dir Drill from 11247' - 11440', TF at 50-100L, 2.60/2.59bpm, 3660psi, FS 3310psi, 2.60psi, rop 100-140fph, ECD 10.07ppg, pvt 273-285bb1s, IA 150-300psi. Drill to 11440 EOB. UP Wt 45K. 06:20 - 09:15 2.92 DRILL P PROD1 POH for lateral BHA. 09:15 - 10:45 1.50 DRILL P PROD1 Dial downmotor from 3.1 to 1.2. Bit 1:1. 10:45 - 13:15 2.50 DRILL P PROD1 RIH to 11250'. 13:15 - 13:20 0.08 DRILL P PROD1 Log tie-in to RA tag in WS. Correction +1' MWD. 13:20 - 13:25 0.08 DRILL P PROD1 RIH to TD 13:25 - 15:30 2.08 DRILL P PROD1 Drill 2.4 / 2.42 bpm @ 3130 psi.FS, Having vibration issues. Adjust pump rate.To 1.98 /1.98 bpm @ 2700 psi, 2460 psi FS, W06.8K,Rop 75, Printed: 12/4/2007 8:53:40 AM WFJrLHEAA~ MCEVOY ACTUATOR= AXELSON KB. ELEV = 53.20' BF. ELEV = 25.62' KOP = 2055' Max Angle= ' Datum MD = 1158T Datum ND= 8800'SS •as~a; 2023' X Nipple tD = 3.813 GAS LIFT MANDRELS 13-3/8" CSG, 72#, L-80, ID= 12.347" 2719' TOP of 7" Lnr 3968' ~ 11 a^ i 2. --~~.. Minimum ID = ~. tit ~ ~ ` ' " .. ~" ~~ TOPOF7" LNR 1--{ 0567' ~ 4-112" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~~ 10622 9-5/8" CSG, 47#, L-80, ID = 8.681" ~~ 10827' PERFORATION SUMMARY REF LOG: BHCS ON 09/26/87 ANGLE AT TOP PERF: 49 @ 11508 Note: Refer to Roduction DB for historical pert data SQE SPF INTERVAL OpnlSgz DATE 2" 6 12475-12625 Op~r 1liivi~ PBTD 11756' 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 11$00' 3 ~~ ~ ST MD ND DEV NPE VLV LATCH PORT DATE 4 3104 38 OTIS RA 3 7517 45 OTIS RA 2 10237 46 OTIS RA 1 10345 46 OTIS RA 10484' TBG SEAL ASSY SBR (}-f~~''€~' 'E('Tii.3 rich'., ';i~,r3 10500 9-5/8" X 4-1/2" TNV PKR 10547' 4-1/2" OTIS X NIP, ID = 3.813" ~ f- ~ ,~r. 10rJ86' 4-1 /2" OTIS XN NIP, ID = 3.725" 10622 4-1 /2" TBG TAIL ID = 3.958" 10626 ELMD TT LOGGED 10/30/87 10975' 7" MARKER JOINT 11"6 fib(}` °I"txa; rtt I .«-""'~ 3-112" x ~~ 3 '..~" x ;1-;1116" ~ ~-- 11730' ~-i FISH - KINLEY CUTTER DATE REV BY COMMENTS DATE REV BY COMMENTS 09/30/87 ORIGINAL COMPLETION 07/16/01 RN/KAK CORRECTIONS 11/16/02 AS/KAK PERFCORRECTIONS 08/16/03 CMO/TLP KB ELEV AND MAX ANGLE 08/16/03 JLA/KK WANER SAFETY NOTE f1116I0! GJS C;'~ ,;: {_1~6A} PRUDHOE BAY UNf>- WELL: K 1 AA PERMIT No: 2671330 API No: p-02: 2 SEC 4, Ti 1 N, R14E, 1909' FNL & 4106' WEL BP Exploration (Alaska) · STATE OF ALASKA . ~f1t7 RECEIVED ALASKA OIL AND GAS CONSERVATION COM SION SEP 0 72007 REPORT OF SUNDRY WELL OPERATIONS ,Alaska Oil & Gas Cons. COOlmission 1. Operations Performed: JinCnorage o Abandon 181 Repair Well / o Plug Perforations o Stimulate o Re-Enter Suspended Well o Alter Casing 181 Pull Tubing/ o Perforate New Pool o Waiver o Other o Change Approved Program o Operation Shutdown o Perforate o Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. 181 Development o Exploratory 187-095 - 3. Address: o Service o Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21752-00-00 - 7. KB Elevation (ft): 53.2' 9. Well Name and Number: PBU K-14 - 8. Property Designation: 10. Field / Pool(s): ADL 028303 Prudhoe Bay Field / Prudhoe Bay Pool - 11. Present well condition summary Total depth: measured 11800 I feet true vertical 8992 I feet Plugs (measured) 10556 Effective depth: measured 11756 . feet Junk (measured) 11730 true vertical 8964 - feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" 110' 110' Surface 2720' 13-3/8" 2720' 2678' 4930 2670 Intermediate 1 0830' 9-518" 10830' 8338' 6870 4760 Production Liner 1226' 7" 10567' - 11800' 8151' - 8992' 7240 5410 Scab Liner 6499' 7" 3968' - 10467' 3611' - 8081' 7240 5410 SCANNED SEP 2 7 2007 Perforation Depth MD (ft): 11575' - 11697' Perforation Depth TVD (ft): 8846' - 8925' Tubing Size (size, grade, and measured depth): 4-112", 12.6# 13Cr80 Surface - 10435' 4-1/?" 1? Pdt I-RO 1 nAR':1.' _ 1 nR??' Packers and SSSV (type and measured depth): 7" x 4-1/2" Baker 'S-3' packer; 10348'; 9-5/8" x 4-1/2" TIW packer 10501 ' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: Cut and pull tubing from -10463'. Run 7" (26#, L-80) Scab Liner (tied into old tubing with Unique Overshot). Cement w/195 Bbls Class 'G' (1095 cu ft /944 sx). Run new Chrome completion. (This work was done in preparation for CTD sidetrack scheduled for late 2007.) 13. Representative Dailv Averaae Production or Injection Data Oil-Bbl Gas-Met Water-Bbl Casina Pressure Tubina Pressure Prior to well operation: Subsequent to operation: 14. Attachments: 0 Copies of Logs and Surveys run 15. Well Class after work: 181 Daily Report of Well Operations o Exploratory 181 Development o Service 16. Well Status after work: 181 Well Schematic Diagram 181 Oil o Gas o WAG DGINJ OWINJ o WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt: Contact Howard West, 564-5471 307 -247 Printed Name Terrie Hubble Title Technical Assistant Signature /(Ó ~ ~ 09 ~ 0 Prepared By Name/Number: Phone 564-4628 Date 07 0 7Terrie Hubble, 564-4628 Form 10-404 Revised 04/2006 1 R. \ () N A L. RBDMS Bfl, SEP 2 5 2007 ~ I if-'-\ 29;?~7 Digital Well File Well: K-14 Well History Well Date 7/24/2007 K-14 K-14 7/24/2007 K-14 7/24/2007 K-14 7/25/2007 K-14 7/27/2007 K-14 7/27/2007 K-14 7/28/2007 K-14 7/28/2007 K-14 7/29/2007 K-14 7/30/2007 K-14 7/30/2007 Print Date: 9/7/2007 . . Page 1 of 1 Summary ****Continued from 07-23-07 WSR**** Assist Slickline (RWO Prep) Pumped 250 bbls crude down TBG. FWP=200/6010 T/I/O= 250/6010 Assist Slìcklìne MIT TBG PASSED @ 3000 psi. (Shut in)(Pre RWO) Had to Call Grease Crew to Service Wing. TBG pressured up wI total of 15.2 bbls Meth pumped. 1 st test TBG lost 160 psi 15 min. wI total loss of 240 psi in 30 min. SL PE's wanted 2nd Test. 2nd Test TBG los 80 psi in 15 min. wi total loss of 100 psi in 30 min. Wing Taggd wi MIT TBG Info. Slickline in Control of Well when we left. Wing is Closed. IA & OA valves are Open. Final WHP's=360/6010 ***WSR CONTINUED FROM 7/24/2007*** LOADED TBG WITH 250 BBLS CRUDE. DRIFTED WITH 3.80" G.RING TO XN NIPPLE @ 10,556' SLM. SET 41/2" XXN PLUG WITH 4 x 1/8" & 4 x 3/16" EQUALIZING PORTS @10,556' SLM. RÁN CHECK SET TO 10,556' SLM (sheared). MII-l PASSED W/PLUG IN I-'LACI::: (3UUUpsi) ****IN THE PROCESS OF DUMP BAILING SLUGGITS, WSR CONTINUED ON 7/25/2007**** ***WSR CONTINUED FROM 7/24/2007*** DUMP BAILED 100LBS OF SLUGGITS ON TOP OF 4-1/2" XN TT PLUG AT 10,556'SLM. ****RDMO, LEFT WELL SIIN wm PLUG / NOTIFIED DSO OF WELL STATUS**** **** WELL SHUT IN ON ARRIVAL **** RIH WITH STRINGSHOT. LOW ORDER DETONATION ONLY. RIH WITH SMALL TUBING PUNCHER. **** JOB CONTINUED ON 28TH JUL **** TI1I0=300/6010 Assist E-Line w. Circ out. (RWO Prep) Road to location. Stand by for SLB to make run. ****Continued on 07-28-07 WSR**** ****Continued from 07-27-07 WSR**** Assist E-Line wlCirc out (RWO Prep) Brought TBG pressure up to 2000 psi with 2 bbls crude. Held pressure while E-Line shot punches in TBG to IA. Bled back 2 bbls crude. Pumped 10 bbls neat meth followed by 283 bbls of SW down lA, up TBG taking returns to the flowline. ***TBG, IA & F.L. are not freeze protected due to upcoming eirc. out*** FWP's=220/18010 **** JOB CONTINUED FROM 27TH JUL **** SHOT 2' TUBING PUNCH FROM 10436- 10438' WITH 2000 PSI SURFACE INDUCED WHP RIH WITH 2X 12' STRINGSHOT TO 10535', MAX O.D. = 1.6875". SHOT STRINGSHOT FROM 10450' - 10462'. RIH WITH CHC TO 10535', MAX OD. 3.625", CUT 4.5" TBG AT 10460'. ***FINAL WHP'S: 150/15010 PSI*** PAD OP NOTIFIED UPON DEPARTURE. T/I/O=100/14010 Load TBG & lA, MIT-OA to 1000 psi. ****PASS**** (Pre RWO) Pumped 5 bbls of neat meth, 400 bbls 9.8# Brine, and 12 bbls DSL down TBG. Pumped 5 bbls neat meth, 677 bbls 9.8# brine, and 23 bbls DSL down IA. Flushed Jumper line with 2 bbls meth **Freeze Protected Flowline per WOA procedure w. 5 bbls neat meth, 31 bbls crude and 5 bbls DSL ** MIT-OA to 1000 psi. PASS on 3rd test. Pumped 2.1 bbls of crude down OA to pressure up to 1000 psi. OA lost 20 psi in 1 st 15 min and 10 psi in second 15 min for a total pressure loss of 30 psi over 30 min. Bled OAP to 0 psi. ****Continued on 07-30-07 WSR**** ****Continued from 07-29-07 WSR**** MIT-OA to 1000 PSI ****PASS**** (RWO Prep) Complete RD & final paper work. FWP=O/O/O T/IAlOA= 01010 Temp= SI PPPOT-T (PASS) PPPOT-IC (PASS) (Pre RWO) PPPOT-T RU HP bleed tool onto THA test void, 0 psi. Cycle LOS "Standard" all moved free with no bent pins one left in out position marked with tape. Pressured test void to 5000 psi for 30 minute test, 49501 15 minutes, 4950/30 minutes. Bleed THA void off to 0 psi, RD test equipment re installed Alemite test cap. PPPOT-IC RU HP bleed tool onto IC test void 0 psi. Cycle LDS "Standard" all were in good condition. all moved free with no bent pins. Pressured test void to 3500 psi for 30 minute test, 34001 15 minutes, 34001 30 minutes. Bleed IC test void off to 0 psi, RD test equipment re installed Alemite test cap. Page 1 of 1 http://digitalwellfile.bpweb.bp .comIWIInfo/Reports/Report Vi ewer. aspx 9/7/2007 . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: K-14 K-14 WORKOVER DOYON DRILLING INC. DOYON 16 Start: Rig Release: Rig Number: 8/2/2007 8/14/2007 Spud Date: 9/10/1987 End: 8/14/2007 8/312007 07:30 - 08:30 1.00 MOB P PRE Begin moving the rig, but the GPB Fire Chief stopped the move due to road work that ADW was performing on the Little Put River crossing. Mike Callaway, ADW Field Drilling Egr explained that this work would not hinder the movement of the rig. Rig move resumed at 0830-hrs. 08:30 - 21 :00 12.50 MOB P PRE Move off DS 7, down Oxbow Road, left onto Point Macintyre Road, left onto K-Pad Road, then left onto K-Pad. Set rig down. Stop rig move due to crew hours. Crew coming from town delayed due to flight delays. 21 :00 - 00:00 3.00 MOB P PRE Remove booster wheels. 8/4/2007 00:00 - 03:00 3.00 MOB P PRE Remove frame for booster wheels, Install BOP stack on IPRE pedestal, Raise derrick and cattle chute. 03:00 - 10:00 7.00 MOB P UD Herculite and rig mats, spot and center over well K-14 and level rig. Bob Noble with AOGCC called at 0830-hours to waive State's right to witness the planned initial BOPE test for K-14. 10:00 - 12:00 2.00 RIGU P PRE Take on hot 9.8-ppg brine to Pits. R/U DSM Lubricator to tree to pull BPV. Pressure test Lubricator to 150-psi. Check pressures on OA and lA, OIO-psi. Tag BPV and tubing is on vacuum. Engage and pull BPV. Test lines from manifold to tree to 3,500-psi. Accept Rig at 1200-hours. 12:00 - 15:30 3.50 KILL P DECOMP Circulate 9.8-ppg brine down tubing to displace diesel and well bore fluid out to the Slop Tank through the Gas Buster. Took 25-Bbls to catch up to fluid in the tubing, which put the fluid level at -1,080'. Recovered about 50-Bbls of diesel and sent it to GC2 for recycle. The OA pressure climbed to 700-psi during the Well Kill, but bled off in seconds when the OA valve was opened to the line connected as a bleed off to the Slop Tank. Hold Pre-Spud meeting with Day Tour crew. 15:30 - 16:00 0.50 KILL P DECaMP Monitor well for 30-minutes and prepare to P/U dry rod and RIH with TWC. 16:00 - 16:30 0.50 WHSUR P DECOMP Cameron Tech, P/U TWC and dry rod it into hanger profile. 16:30 - 18:00 1.50 WHSUR P DECOMP Pressure test TWC from below and it takes fluid at 1-2-BPM and 500-1000-psi. Test from top to 3,500-psi; check for leaks in valves and tree. Holds rock-solid for 10 charted minutes. 18:00 - 20:00 2.00 WHSUR P DECOMP N/D tree and adaptor flange and remove from cellar. 20:00 - 21 :00 1.00, WHSUR P DECaMP Clean and prep wellhead. Check hanger threads. Threads looked good, XO took 8 turns to make up. Function lock down screws. 21 :00 - 23:00 2.00 DECOMP NIU BOPE 23:00 - 00:00 1.00 DECaMP RIU BOP test assembly 8/5/2007 00:00 - 05:00 5.00 DECOMP Test BOPE, Choke Manifold, IBOP's and Floor Valves to 250 psi low and 3,500 psi high. Each test was held for 5 minutes. AOGCC witness of test was waived by Bob Noble. Test was witnessed by Doyon Toolpusher and BP WSL. Lower VBR's failed with the 5 1/2" test joint. 05:00 - 09:00 4.00 DECOMP RID test assembly and drain BOP stack. Remove and replace VBR. 09:00 - 11 :30 2.50 DECOMP Pump 9.8-PPQ brine into IA to obtain loss rate to the Cretaceous leak. Pumped 27-Bbls to see fluid level after the well had been SII for 13-1/2-hours; 2-BPH fluid loss rate with FL at -616'. Resume testing BOPE. Perform Body test and it is solid. P/U 5-1/2" test joint and RIH. It doesn't test. POH, UD 5-1/2" test jt and P/U 4" test jt---it tests solid. Call for another Printed: 8/26/2007 1 :31 :37 PM . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 8/5/2007 09:00 - 11 :30 11 :30 - 15:00 15:00 - 16:00 16:00 - 18:30 18:30 - 19:00 19:00 - 20:00 20:00 - 20:30 20:30 - 00:00 8/6/2007 00:00 - 04:30 04:30 - 06:30 06:30 - 08:00 08:00 - 08:30 08:30 - 10:00 10:00 - 11 :00 11 :00 - 13:00 . K-14 K-14 WORKOVER DOYON DRILLING INC. DOYON 16 2!; fl!!4ff:'1 ·1 3.50 BOPSUFj P I I I I 1 Jopsu~ P 2.50 BOPSU1 P I 0.50 BOPSUR P 1.00' PULL Ip I 0.50 PULL IN 3.50 PULL IN IN I N N Start: Rig Release: Rig Number: Spud Date: 9/10/1987 End: 8/14/2007 8/2/2007 8/14/2007 DECOMP DECOMP DECOMP DECOMP DECOMP DECOMP DPRB DECOMP DPRB DECOMP 4.50 I PULL 2.00 PULL 1.50 PULL DPRB DECOMP DPRB DECOMP DPRB DECOMP 0.50 PULL N 1.50 PULL N 1.00 PULL N 2.00 PULL N ¡DPRB DPRB DPRB DECOMP DECOMP DECOMP DPRB DECOMP 13:00 - 14:30 1.50 PULL N DPRB DECOMP 14:30 - 15:00 0.50 PULL N DPRB DECOMP I 15:00 - 16:00 1.00 PULL N DPRB DECOMP 16:00 - 18:00 2.00 PULL N DPRB DECOMP 18:00 - 19:00 1.00 PULL N DPRB DECOMP 19:00 - 19:30 0.50 PULL P DECOMP 19:30 - 20:30 1.00 PULL P DECOMP 20:30 - 23:00 2.50 PULL P DECOMP 23:00 - 00:00 1.00 PULL P DECOMP 5-1/2" test joint from 4ES. Open VBR doors and inspect rams but don't see anything apparent. PIU second 5-1/2" test joint and RIH. Cannot get the VBRs to seal on the 5-1/2" test joint. POH and PIU the 4" test joint and RIH; it tests rock solid. Toolpusher called Hydril and they said that this has been a recurring problem with their VBR rubbers. Hydril recommended actuating the VBRs a few times against 3-1/2" pipe, then heating the elastomers in the VBRs with hot water or steam. Resume BOP testing and VBRs hold against the 5-1/2" test joint. Complete BOPE testing at 1600-hours. RID BOPE test equipment. Wait on DSM team to pull TWC. They were called away from K-14 while awaiting the completion of the BOPE tests. RIU DSM lubricator and pull TWC. M/U landing joint, BOLDS, attempt to pull hanger to floor. Hanger came off seat at 135,000#. Tubing not pulling free, Pull up to 260,000# still not free. Work pipe multiple times. Unable to pull tubing. Took 39 bbls to fill hole. Discuss options with well engineer. Land tubing hanger, RILDS, N/D flow riser and NIU shooting flange. Wait on Schlumberger E-line unit. Spot E-line unit, R/U wireline BOP's, lubricator extension and grease head. PJSM. MIU String Shot in cellar, MIU and test Lubricator. RIH String Shot to 10,530' and make correlation runs. The Pre-rig Chemical Cut at 10,460' was apparent on the CCL. Fire String Shot. Electrical indication in the van of firing, but no physical evidence at the surface. POH with E-line String Shot assembly. PJSM. Break off and UD the remains of the firing assembly. Obvious evidence of successful firing. Hold PJSMs for both rig crews for handling Chemical Cutting equipment. Test fire firing head, okay. SWS crew in full body PPE R/U Chemical Cutter in Cellar and PIU through floor and into Schlumberger Lubricator. Connect Lubricator to extension and prpare to RIH. RIH SWS Chemical Cutter to 10,400'. Make correlation passes from 10,550' to 10,300'. Park cutter at 10,463' and fire at 1447-hrs. Successful indications in van and on rig floor. POH with SWS E-line and the fired Chemical Cutter. PJSM. B/O and UD fired Chem Cutter assembly and pressure control equipment. N/D shooting flange and NIU flow riser. MIU landing joint, BOLDS and pull hanger to rig floor. Hanger came off seat at 135,000#, tubing came free at 162,000#. Circulate bottoms up 12.5 bpm at 1,020 psi. Loss rate 16 bph while um ing. UD 51/2", 17#, L-80, BTC tubing and dual encapsulated control line. Recovered 24 clamps and 4 SS bands. RID control line spooler. Printed: 8/26/2007 1 :31 :37 PM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: K-14 K-14 WORKOVER DOYON DRILLING INC. DOYON 16 Start: Rig Release: Rig Number: 8/2/2007 8/14/2007 Spud Date: 9/10/1987 End: 8/14/2007 8/712007 00:00 - 07:00 7.00 I PULL P UD 5 1/2", 17#, L-80, BTC tbg and 41/2", 12.6#, L-80 BTC tubing. UD a 22.74' long cutoff joint at 0700-hrs. Recovered 62-full joints of 5-1/2" buttress tubing, 197-full joints of 4-1/2" buttress tubing, 4-GLMs, an SSSV, the Sliding Sleeve, all of the double SS control lines, 4-SS bands, and 24-clamps. 07:00 - 07:30 0.50 CLEAN P DECOMP Clear and clean Rig Floor. RID tubing handling tools. 07:30 . 08:00 0.50 CLEAN P DECOMP P/U and install wear ring. 08:00 - 10:00 2.00 CLEAN P DECOMP P/U and M/U BHA: Dress-off Mill inside washover pipe, Boot basket, 9-5/8" Scraper, Bumper Jar, Oil Jar, and 9-ea 4-3/4" DCs. 10:00 - 18:30 8.50 CLEAN P DECOMP RIH with BHA #1 on 4" DP from Pipe Shed to 10,447' 18:30 - 19:00 0.50 CLEAN P DECOMP Establish parameters, Up weight 196,000#, Down weight 128,000#, Rotating weight 160,000#, 8,000 ft/lbs of torque at 40 rpm. Tag tubing stub at 10,461', wash over tubing stub to 10,470'. Was able to get over tubing stub with no problems. 19:00 - 20:30 1.50 CLEAN P DECOMP Circulate 20 bbl high-vis sweep around at 10 bpm with 2,600 psi. 20:30 - 22:00 1.50 CLEAN P DECOMP Slip and cut 89' of drilling line. Inspect and adjust drawworks brakes. 22:00 - 00:00 2.00 CLEAN P DECOMP POOH standing back 4" DP to 6,763' 8/8/2007 00:00 - 01 :30 1.50 CLEAN P DECOMP POOH with BHA #1 01 :30 - 02:00 0.50 CLEAN P DECOMP Stand back DC's, UD BHA. 02:00 - 02:30 0.50 CLEAN P DECOMP Clear and clean rig floor. 02:30 - 04:00 1.50 CASE P TIEB1 R/U 7" casing handling equipment. Strap jewelry and place in running order. 04:00 - 05:00 1.00 CASE P TIEB1 Hold PJSM with all personnel involved. P/U Unique overshot assembly and dump 20/40 river sand on top of Type 2 landing collar. 05:00 - 14:30 9.50 CASE P TIEB1 Run 157 total Joints of 7",26#, L-80, BTC-M casing. Using Best of Life 2000 pipe dope. Average Torque -8150 ft-Ibs to make up to mark. Free Floating Centrilizers on every joint. Fill Liner every 5 joints. PJSM on Picking Up Liner Hanger. M/U Baker Flex Lock Liner Hanger and HRD ZXP Liner Top Packer. P/U Wt = 185,000 Ibs SIO Wt = 150,000 Ibs. 14:30 - 15:30 1.00 CASE P M/U 1 Stand of 4" DP and RIH. M/U Clrc Head. Clrc Liner Volume at 5 bpm and 400 psi. PJSM on RIH wI Liner, Landing and Spacing Out, PIU and M/U of Cement Head. 15:30 - 18:30 3.00 CASE P TIEB1 RIH wI 7" Liner on 4" HT 38 DP from Derrick. 18:30 - 19:30 1.00 CASE P TIEB1 M/U Baker Cementing head. Establish parameters up weight 265,000#, down weight 155,000#. 19:30 - 20:00 0.50 CASE P TIEB1 Tag top of tubing at 10,461', Slid over tubing stub, sheared pins with 5,000#. Slacked off to NO/GO at 10469'. P/U to neutral weight plus 2' to 10,467' 20:00 - 21 :00 1.00 CASE P TIEB1 Circulate at 5 bpm with 690 psi. Hold PJSM with all personnel involved. 21 :00 - 23:30 2.50 CEMT P TIEB1 Pressure test lines to 5,000 psi, Batch up and pump 10 bbls of 15.8 ppg class G cement neat, 80 bbls of 15.8 ppg class G cement with 1/4 Ib per bbl of CemNet, 105 bbls of 15.8 ppg of Class G cement neat, kick out plug with 5 bbls of water. Displaced with 280 bbls of 9.8 ppg Brine. Bumped plug. CIP @ 23:15. Bled back and checked floats. Lost rate of 10 - 12 bph while displacing. Printed: 8/26/2007 1 :31 :37 PM . . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: K-14 K-14 WORKOVER DOYON DRILLING INC. DOYON 16 Start: 8/2/2007 Rig Release: 8/14/2007 Rig Number: g~>1 TIE~-I Pressure up ~o set Baker FLEXLOCK " Hanger and ZXP I Packer Saw surface indication of setting at 3,100 psi, continue to pressure up to 4,500 psi. Slack off and bleed off pressure. TIEB1 Release running tool from liner. TIEB1 I Circulate out excess cement, 15 bpm with 3,000 psi. 5-6 bbls ~ of cement returns at surface. i UD Baker cement head, Blow down and RID lines. I POOH with liner running tool, standing back 4" DP. , Make service breaks on liner running tool. UD liner running ,¡tOOl. Pull wear bushing, M/U stack washing tool and flush BOP stack 'I and flow line. M/U BHA #2, 6 1/8" Bit, 2 x Boot Baskets, 7" Csg Scraper, XO, I Bumper Jar, Oil Jar, XO, 9 x DC's. Total BHA lenght = 311.24' I RIH with 4" DP to 1,073' . M/U HES RTTS. Set 1 stand below rig floor. Test RTTS to '11,500 psi for 30 minutes. Good Test. , Pull McEvoy 9 5/8" Pack Off, Pack Off pulled free with 25,000#. 'I' Installed new 9 5/8" Pack Off. RILDS and torque to 550 ft/lbs. Plastic pack voids and test Pack Off to 3,800 psi for 30 I' minutes. Good test. Retrieve RTTS and UD. ! RIH with BHA #2 on 4" DP to 10,307'. Did not see top of 7" I scab liner. , R/U and presure test 9 5/8" x 7" casinQ to 3.500 psi for 30 I minutes. Good test. - Establish parameters, up weight 210,000#, down weight 120.000#, rotating weight 157,000#, 50 rpm and 10,000 ft/Ibs of torque off bottom, 2,120 psi pump pressure with 8 bpm. Drill cement and float equipment from 10,307' to 10,435' with 10,000 - 12,000# WOB, 80 rpm with 13,000 ft/lbs of rotary torque, 2,860 psi pump pressure at 10 bpm. Saw Landing collar at 10,352' Float collar at 10,395' and XO at 10,435' Work 7" casing scraper from 10,360' to 10,423'. Work 6 times. Displace 9.8 ppg Brine with 40 bbl high vis sweep followed by 8.5 ppg seawater. 2,040 psi pump pressure at 8 bpm. Work 7" casing scraper from 10,360' to 10,310'. Work 6 times. Pump dry job. POOH standing back 4" DP to 4,484' POOH standing back 4" DP from 4,484' to 311 '. ,Stand back DC's and UD 61/8" Drill Out assembly I MIU BHA #3, 33/4" Junk Mill, Bit Sub, 6 x 27/8" PAC DP, XO, XO, 2 x Boot Basket, XO, Bumper Sub, Oil Jar, XO, 9 x DC's. Total BHA = 498.86' RIH with BHA #3 on 4" DP. Take Initial Parameters: P/U Wt = 225,000 Ibs; SIO Wt = 121,000 Ibs; Rot Wt = 157,000 Ibs at 50 rpms and 10,000 ft Ibs torque. Tag Up on 4-1/2" x 7" XO at 10435'. Bring On Pumps at 7 bpm and 1800 psi. Mill Cmt, Junk, and Wash Sand down to Baker Type" Landing Collar at 10447'. Mill on Baker Type" Landing Collar wi 0-3,000 Ibs Wt on Mill. Once through make multiple passes to ensure Landing Collar Milled Up. Pump 20 bbl High Visc Sweep 8/8/2007 8/9/2007 00:00 - 00:30 0.50 CASE P 00:30 - 01 :00 0.50 CASE P 01 :00 - 01 :30 0.50 CASE P 01 :30 - 02:30 1.00 CASE P 02:30 - 03:00 0.50 CASE P 03:00 - 05:00 ' 2.00 CASE P 05:00 - 06:00 1.00 DRILL P 06:00 - 06:30 0.50 DRILL P 06:30 - 07:30 1.00 DHB P 07:30 - 08:00 0.50 WHSUR P 08:00 - 09:00 1.00 WHSUR P 09:00 - 09:30 0.50 DHB P 09:30 - 13:30 4.00 DRILL P 113:30 - 15:00 1.50 CASE P 15:00 - 19:00 4.00 DRILL P [19:00 - 19:30 0.50 DRILL P 19:30 - 21 :30 2.00 DRILL P 21 :30 - 22:00 0.50 DRILL P 22:00 - 00:00 2.00 DRILL P 8/10/2007 00:00 - 01 :00 1.00 DRILL P 01 :00 - 01 :30 0.50 DRILL P 01 :30 - 02:30 1.00 CLEAN P 102:30 - 06:30 4.00 CLEAN P 06:30 - 07:30 1.00 CLEAN P 07:30 - 09:00 1.50 CLEAN P TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 ITIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 TIEB1 CLEAN CLEAN CLEAN CLEAN Spud Date: 9/10/1987 End: 8/14/2007 Printed: 8/26/2007 1 :31 :37 PM . . legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: K-14 K-14 WORKOVER DOYON DRilLING INC. DOYON 16 Start: Rig Release: Rig Number: 8/2/2007 8/14/2007 Spud Date: 9/10/1987 End: 8/14/2007 Wash Down below landing collar to sluggits at 10576'. Make Multiple Passes to ensure tubing is clean. Wash top two feet of Sluggits to 10578'. Wash very easily - does not appear to be junk. 10:30 - 11 :30 1.00 CLEAN P CLEAN Circulate 20 bbl High Visc Sweep and Chase out of hole at 9.5 bpm and 3180 psi. 11 :30 - 15:00 3.50 CLEAN P CLEAN POOH standing back 4" DP to 498' 15:00 - 16:30 1.50 CLEAN P CLEAN Stand back DC's, UD Mill assembly. Empty boot baskets, recovered 1 gallon of sand, cement and metal cuttings. 16:30 - 17:30 1.00 CLEAN P CLEAN M/U BHA #4, RCJB, Bit Sub, Pump Out Sub, 6 x 2 7/8" DP, XO, XO, 2 x Boot Baskets, XO, Bumper Sub, Oil Jar, XO, 9x DC's. Total BHA Lenght = 504.24' 17:30 - 21 :00 3.50 CLEAN P CLEAN RIH with BHA #4 on 4" DP to 10,375' 21 :00 - 22:00 1.00 CLEAN P CLEAN Slip and Cut 90' of drilling line. Inspect drawworks. 22:00 - 22:30 0.50 CLEAN P CLEAN RIH to 10,471', MIU Top Drive, unable to circulate, POOH back to 10,375'. 22:30 - 23:30 1.00 CLEAN P CLEAN Unable to circulate down pipe. R/U to reverse circulate. Get , pipe unplugged. Reverse circulate DP volume. 3.5 bpm with 1,750 psi. Sand in returns at shakers. 23:30 - 00:00 0.50 CLEAN P CLEAN Pump 20 bbl high vis sweep at 5 bpm with 1350 psi. 8/11/2007 00:00 - 01 :30 1.50 CLEAN P CLEAN Wash down to 10,554' with 20 rpm and 8 bpm with 3,000 psi. 01 :30 - 02:30 1.00 CLEAN P CLEAN Drop ball, wash down with RCJB and tag up at 10,579'. P/U and wash back down, set down with 4,000#, solid tag at 10,579' 02:30 - 03:30 1.00 CLEAN P CLEAN POOH to 10,467', drop dart and open circ sub. CBU at 12 bpm with 3,200 psi. Pump dry job. 03:30 - 07:00 3.50 CLEAN P CLEAN POOH from 10,467' standing back 4" DP. Losinç¡ 3 bph seawater. 07:00 - 09:00 2.00 CLEAN P CLEAN Stand back DC's, clean out junk baskets and rebuild pump out sub. Recover 1/2 gallon of metal flakes from float equipment, sand and cement in junk baskets, recovered 1 piece of metal in RCJB, appx 1 1/2" round by 1/4" thick. 09:00 - 10:00 1.00 CLEAN P CLEAN Rerun BHA #4, RCJB assembly. 10:00 - 14:30 4.50 CLEAN P CLEAN RIH with 4" DP, filling pipe every 25 stands to 10,375' 14:30 - 15:30 1.00 CLEAN P CLEAN Wash and ream to 10,566', 6 bpm with 1,590 psi, 50 rpm with 12,000 ft/lbs of rotary torque. Pump 20 bbl sweep past BHA. 15:30 - 17:00 1.50 CLEAN P CLEAN Drop ball for RCJB. Wash to plug at 10,579'. 5 bpm with 1,890 psi. Pump 20 bbl sweep past BHA. 17:00 - 18:00 1.00 CLEAN P CLEAN Drop opening dart and circulate bottoms up at 10 bpm with 2,900 psi. 18:00 - 00:00 6.00 CLEAN P CLEAN POOH laying down 4" DP from 10,579' to 3,572' 8/12/2007 00:00 - 02:30 2.50 CLEAN P CLEAN POOH laying down 4" DP from 3,572' to 504' 02:30 - 04:00 1.50 CLEAN P CLEAN UD BHA, RCJB assembly. Recovered appx 1/2 gallon of sluggets and sand in boot baskets, RCJB was empty. 04:00 - 04:30 0.50 CLEAN P CLEAN Clear and clean rig floor. 04:30 - 05:00 0.50 I BOPSU P CLEAN Pull wear bushing. 05:00 - 08:00 3.00; BOPSU P CLEAN Test BOPE to 250 psi low and 3,500 psi high pressure. Choke Valve #1, 12, 13, 14, Upper IBOP, HCR Kill. Choke Valve #9,11, Lower IBOP and Kill Manual. Choke Valve #5, 8,10, and TIW. Choke Valve #4,6,7 and Dart Valve. Chaoke Valve #2. Choke HCR. Printed: 8/26/2007 1 :31 :37 PM . . legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: K-14 K-14 WORKOVER DOYON DRilLING INC. DOYON 16 3.00 2.00 10:00 - 11 :30 CLEAN 11 :30 - 13:00 1.50 BOPSU N CLEAN 13:00 - 13:30 0.50 BOPSU N CLEAN 13:30 - 15:00 1.50 BOPSU N CLEAN 15:00 - 16:00 I 1.00 BOPSU N CLEAN 16:00 - 16:30 I 0.50 BOPSU N CLEAN 16:30 - 18:00 1.50 BOPSU~ N CLEAN i I 18:00 - 19:00 1.00 BOPSUR N CLEAN 19:00 - 19:30 19:30 - 20:30 0.50 BOPSU 1.00 BOPSU CLEAN CLEAN RUNCMP 20:30 - 22:00 RUNCMP 22:00 - 00:00 RUNCMP 8/13/2007 00:00 - 11 :00 RUNCMP 11 :00 - 13:00 13:00 - 13:30 0.50 RUNCO P RUNCMP 13:30 - 16:30 3.00 I RUNCO P RUNCMP Start: Rig Release: Rig Number: Spud Date: 9/10/1987 End: 8/14/2007 8/2/2007 8/14/2007 Manual Choke. Found Leak attempting to test pipe rams on 4" Test Joint. Pull Test Joint and attempt to test with blinds against Test Plug, still leaking. Isolate tes pump and notice leak on chart from tes pump. Pull and reset Test Plug, double block test pump to pressure sensor. Test Blind Rams and Choke Valve #3. Good Test. Pick Up 4-112" Test Joint and Attempt to Test Pipe Rams. Found Leak attempt to test multiple times. Drain Stack and see leaking over top of pipe rams. Will Need to replace rams. PJSM, RID Test Equipment, Pull Test Plug, and Install Wear Ring. Gather up XO's and 6-1/4" DC's for setting RTTS Storm Packer for barrrier requirements. P/U nine 6-1/4" DC's, HES RTTS Storm Packer and DP. Set RTTS below rig floor. Pull Out of hole with HES Setting Tool. Rig Up Test Equipment. Pressure Test RTTS to 1500 psi for 30 min~ - goorl T ¡>c:t Pull Wear Ring and set Test Plug. R/U and test Test Plug to 1500 psi for 10 charted minutes. Good Test. Suck out BOP body and change out 2-7/8" x 5" Variable Pipe Rams. RIU test equipment and test VBR to 250 psi low pressure and 3500 psi high pressure with 4" and 4-1/2" Test Joints. Tests held for 5 charted minute. Test witnessed by Doyon Toolpusher and BPX WSL. RID BOP testing equipment. RIU and pull Test Plug. RIH with HES Retreiving Tool. Engage HES RTTS Storm Packer and release. POOH, UD DP, DC's, and HES Storm Packer. PJSM. P/U Doyon TBG running equipment. R/U Torque Turn equipment, TBG elevators, bales, and slips. Final check on all Jewelry and TBG to RIH. P/U and run 4-1/2" 12.6#, 13Cr, Vam Top Completion to 584'. All TBG and Jewelry drifted before P/U. All connections Torque Turned, average torque of 4440 ft-Ibs. Stabbing Guide and "Jet Lube Seal Guard" used on all connections. P/U and run 4-1/2" 12.6#, 13Cr, Vam Top Completion from 584' to 10399'. All TBG and Jewelry drifted before P/U. All connections Torque Turned, average torque of 4440 ft-Ibs. Stabbing Guide and "Jet Lube Seal Guard" used on all connections. Up Wt = 165,000 Ibs, Dw Wt = 105,000 Ibs. P/U Jt #243 and tag at 37.5' in = 10436'. Confirm Tag. Pull Out #243 & 242 and UD. P/U 9.73' Space Out Pup for 2' Space Out above 7" x 4-1/2" XO. M/U Jt #242. M/U McEvoy Tbg Hanger and 4-1/2" TCII Landing Joint. Land Tbg Hanger at 22.69 ft below Rig Floor. RILDS PJSM with Rig Crew, Mud Engineer, and Truck Drivers on Displacement. PT Surface Lines to 4000 psi. Displace well with 170 bbls of 140 degree Sw followed by 340 I ~:' of 140 d'gee, Sw w;th ,""",;00 ;oh;b;Io,. 3 bpm at 240 Printed: 8/26/2007 1 :31 :37 PM . . legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: K-14 K-14 WORKOVER DOYON DRilLING INC. DOYON 16 Start: 8/2/2007 Rig Release: 8/14/2007 Rig Number: Spud Date: 9/10/1987 End: 8/14/2007 19:00 - 19:30 0.50 BOPSU P 19:30 - 22:00 2.50 BOPSU P 22:00 - 00:00 2.00 WHSUR P 8/14/2007 00:00 - 01 :30 1.50 WHSUR P 01 :30 - 02:00 0.50 WHSUR P 02:00 - 03:00 1.00 WHSUR P 03:00 - 05:00 2.00 WHSUR P 05:00 - 06:30 1.50 WHSUR P 06:30 - 07:30 1.00 WHSUR P 07:30 - 09:30 2.00 WHSUR P RID Clrc Equipment. Drop Ball and Rod. UD Landing Joint. Close Blinds and Pressure Up on Tubing to 3500 psi for 30 mins to set packer and test tubing. Good Test. Bleed down pressure to 1700 psi. Isolate Tbg and Pressure Up on Annulus to 3500 psi and test for 30 mins. Good Test. Bleed Off Tbg Quickly. Shear DCR Valve 2300 psi differential. Pump both ways through Shear Valve to confirm open. 3 bpm with 260 psi. WHDTRE Set TWC with Cameron wellhead tech. Test from below to 1,000 psi and above to 3,500 psi for 10 minutes each on chart. Good tests. WHDTRE Suck out stack, RID lines. NID BOP stack and set back on pedestal. WHOTRE Prep wellhead, N/U McEvoy SSH tubing head adaptor flange and test to 5,000 psi as per Cameron procedures. Good test. WHDTRE N/U Tree. Test tree to 5,000 psi with diesel. Good test. WHDTRE RID tubing tongs and compenstor. WHOTRE R/U DSM lubricator and test to 500 psi. Pull TWC. WHOTRE R/U Little Red Services, Pressure test lines to 3,500 psi. Pump 165 bbls of diesel freeze protect down IA at 2 bpm with 550 psi. WHDTRE U-tube diesel freeze protect between IA and tubing. WHOTRE Set BPV and tested from below to 1,000 psi for 10 minutes. WHOTRE Blow down circulating lines, secure production tree, clean cuttings tank. The Rig was released at 09:30 hrs on 8/14/2007. Printed: 8/26/2007 1 :31 :37 PM K-14 (PTD #1870950) Internal wai.cancellation Regg, James B (DOA) . Page I of I From: NSU, ADW Well Integrity Engineer [NSUADWWelllntegrityEngineer@BP.com] Sent: Sunday, August 19, 20072:35 PM To: Regg, James B (DOA); Maunder, Thomas E (DOA); Fleckenstein, Robert J (DOA); NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, GC1 OTL; GPB, Area Mgr Central (GC1/3/FS3); GPB, GC1 Wellpad Lead; GPB, Wells Opt Eng; GPB, Optimization Engr Cc: NSU, ADWWelllntegrity Engineer; Subekti, Herry; NSU, ADWWI Tech Subject: K-14 (PTD #1870950) Internal Waiver Cancellation 1?~11 ß!Z-1/D 7 All, An internal waiver was issued for a PC leak on well K-14 (PTD #1870950) on 01/07/06. The rig placed and cemented a scab liner over the PC leak on 08/14/07, thus restoring production casing integrity. The well is currently on the schedule for a CTD ,,/ sidetrack in October. The well is reclassified as Operable. Please remove all waivered well signs and the laminated copy of the waiver from the wellhouse. Please call with any questions or concerns. Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 S~NED SEP 1 1 2007 8/29/2007 . ~V~VŒ (ID~ ~~~~æ~ . AI,A~1iA OIL AlQ) GAS CONSERVATION COltDlISSION SARAH PAUN. GOVERNOR 333 W. 7th AVENUE. SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 David Reem Engineering Team Leader BP Exploration Alaska, Inc. PO Box 196612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU K -14 Sundry Number: 307-247 SCANNED AUG 0 3 Z007 Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set Q.ut in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED this ~ day of August, 2007 Enc!. 1'8-<1--0'1-6- f}en- z.b 17 Wt/ STATE OF ALASKA . ALASKA Oil AND GAS CONSERVATION COM SION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25 280 ~l' RECEIVED JUL .2 3 2007 t~laska Oil & Gas Cons Comm' . . 15510 A 1. Type of Request: o Abandon o Suspend o Operation Shutdown o Perforate o Time Extension g' o Alter Casing 181 Repair Well j 0 Plug Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program 181 Pull Tubing o Perforate New Pool o Waiver o Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ~ Devélopment o Exploratory 187 -095 ."r 3. Address: D Service o Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21752-00-00 . 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU K-14 ". Spacing Exception Required? DYes ~No , 9. Property Designation: ... 110. KB Elevation (ft): 11. Field / Pool(s): / ADL 028303 53.2' / Prudhoe Bay Field / Prudhoe Bay Pool 1.1:~¡iÄi»i+><ÄJ .... .....< ; ". .ci J II:r NDlllnN .J ii.. ". ';J>;.;'.;; (¿<..;i(i.... ;iii........;iii? .r Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11800 ~ 8992 11756 . 8964 None 11730 Casinn Lennth Size MD TVD Burst Collanse Structural Conductor 110' 20" 110' 110' Surface 2720' 13-3/8" 2720' 2678' 4930 2670 Intermediate 10830' 9-5/8" 1 0830' 8338' 6870 4760 Production Liner 1226' 7" 10574' -11800' 8156' - 8992' 7240 5410 Perforation Depth MD (ft): ì Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft): 11575' - 11697' 8846' - 8925' 5-1/2",17# x 4-1/2",12.6# L-80 1 0622' Packers and SSSV Type: 9-5/8" x 4-1/2" TIW packer I Packers and SSSV MD (ft): 10501' 13. Attachments: 14. Well Class after proposed work: ... ~ Description Summary of Proposal D BOP Sketch D Exploratory ~ Development D Service D Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencina Operations: August 10, 2007 ~Oil " DGas D Plugged o Abandoned 17. Verbal Approval: Date: DWAG DGINJ DWINJ o WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Howard West, 564-5471 Printed NaWid Reem Title Engineering Team Leader David Reem, 564-5743 Prepared By Name/Number; Signature ~ h d AA_ _ Phone 564-5743 Date ':¡-/I-,{o7 Terrie Hubble, 564-4628 Commission Use On Iv I Sundry Number: (~7" ~.J.t '1 Conditions of approval: Notify Commission so that a representative may witness D Plug Integrity ~BOP Test D Mechanical Integrity Test D Location Clearance Other: ~500~\ ~\> \t"" \- Ç>"","\~ c.0\>" Ð S;.?:å C; ~ ~ ~~\(;)~-~,,~~ <b~ Subsequent Fonn Requi'ed' '-\tlL\, . !J APPROVED BY ~Z-ð1- Approved Bv: I -;, OMMISSIONER THE COMMISSION Date Fonn 10-403 Revised 06120060 RIG IN ~ \. .- Fl Submit In Duplicate ~'~BAIJG 022007 <ò\\\c1 /Þ1~'4>7 ;: 6f;#- 4~P7 . . G K-14 Rig Workover Scope of Work: Pull 5-1/2" x 4-1/2" L-80 completion, run and cement 7" scab liner to -4000' to cover cretaceous leak, replace 9-5/8" pack-off, and run 4-%" 13Cr80 completion. ./ MASP: 2380 psi Well Type: Producer / Estimated Start Date: Aug 10, 2007 Pre-Rig: 0 1 Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breakaqe (check one at a time). PPPOT-T & IC. S 2 Drift to 10586' for 4 %" XX plug & chemical cutter. Set TTP in the XN-nipple @ 10586' md. Dump bail 1 0' of sluÇJÇJits on top of pluo. E 3 Chemical cut @ -10460', in the middle of the 1 S full joint above the packer. (Ref: 09/29/1987 tubinq summary). F 4 Circulate well with seawater and FP w/ diesel thru the cut. CMIT TxlA to 3500 psi to confirm mechanical barrier and casino inteority. Bleed WHP's to 0 psí.'.... 0 5 Set a BPV in the tubing hanger. Remove the wellhouse & flow line Level the pad as needed for the riq. ""I \)ro~"'()(è C\-ö-~~ ~Ö~'i ð~ Proposed Procedure <::.."-' 'T \ ~ -\-c <.s::.,",,~"~~'\:t) 'i'\,Jt"'rl 1. MIRU. ND tree. NU and test BOPE with to 250 psi low, 3500 psi high. Circulate out freeze ~~, protection fluid and circulate well to clean 9.8 ppg brine through the cut. l 2. Pull and LD tubing string to the cut. 3. Run 7" scab liner on drill pipe to cover cretaceous leak Note: VBR's will not be changed to 7" pipe rams due to a tested mechanical barrier to the Ivishak. 4. Cement new 7" scab liner to top of liner and set liner top packer and hanger. 5. Change out 9-5/8" packoff and pressure test to 3800 psi. 6. Run 4- W' 13Cr80 completion with Baker S-3 packer. 7. Displace the IA to packer fluid and set the packer. 8. Test tubing and IA to 3500 psi. Freeze protect to 2200' MD. 9. Set BPV. ND BOPE. NU and test tree. RDMO. TREE = WELLHEAD = ACTUATOR = KB, ELEV = BF, ELEV = KOP= Max Angle = Datum MD = Datum lVD = 6" CAMERON MCEVOY AXELSON 53.20' 25,62' 2055' 50 @ 3962' 11587' 8800' SS 15-1/2" TBG, 17#, L-80, ,0232 bpf, ID = 4,892" 1 ITOP OF 4-1/2" TBG 1 113-3/8" CSG, 72#, L-80, ID = 12347" 1 Minimum ID = 3.725" @ 10586' 4-1/2" OTIS XN NIPPLE TOP OF 7" LNR 1 10567' 14-1/2" TBG, 12,6#, L-80, ,0152 bpf, ID = 3958" 1 10622' 19-5/8" CSG, 47#, L-80, ID = 8,681" I 10827' ÆRFORA TION SUMMA RY REF LOG: BHCS ON 09/26/87 ANGLEAT TOP ÆRF: 49 @ 11508 Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 3-3/8" 4 11508 - 11515 S 06/18/99 3-3/8" 4 11560 - 11575 S 06/18/99 3-3/8" 6 11575 - 11595 0 11/25/99 3-3/8" 10 11599 - 11620 0 08/23/99 3-3/8" 10 11630 - 11659 0 08/23/99 3-1/8" 4 11664-11675 0 07/03/99 3-1/8" 4 11682-11697 0 07/03/99 I PBTD 1 11756' I 7" LNR, 26#, L-80, ,0383 bpf, ID = 6276" 1 11800' DATE 09130187 08/16/03 01/07/06 REV BY COMMENTS ORIGINAL COM PLETION JLA/KK WAIVER SAFETY NOTE corvvPJC WAIVER SFTY NOTE UPOA TE DATE K-14 ðI:\ ." / REV BY COMMENTS S OTES: CRETACEOUS LEAK*** PRO CTION CASING LEAK. OPERATING LIMITS: MAX lAP = 500 PSI; MAX OAP = 1000 PSI (01/07/06 WAIVER) *** 1978' ~5-1/2" OTIS HRQ SSSV LAND NIP, ID = 4,562" 2500' GAS LIFT MANDRELS ST MD lVD DEV TYÆ VLV LATCH PORT DATE 4 3104 2942 38 OTIS RA 3 7517 5967 45 OTIS RA 2 10237 7870 46 OTIS RA 1 10345 7943 46 OTIS RA 10425' - 4-1 /2" BKR L SLIDING SL V, ID = 3,812" I 10484' 10500' 10547' - 4-1/2" OTIS X NIP, ID = 3,813" I 10586' - 4-1/2" OTIS XN NIP, ID = 3,725" 10622' - 4-1/2" TBG TAIL ID = 3.958"1 10626' H ELMD TT LOGGED 10130/87 I 10975' - 7" MARKER JOINT I 11730' - FISH - KINLEY CUTTER I PRUDHOE BAY UNfT WELL: K-14 ÆRMfT No: f'1870950 API No: 50-029-21752-00 SEC 4, T11 N, R14E. 1909' FNL & 4106' WEL BP Exploration (Alaska) TREE = WELLHEÁD = ACTUATOR = KB, ELBI = BF. ELBI = KOP= Max Angle = Datum MD = Datum lVD = 6" CAMERON MCBlOY AXELSON 53,20' 25,62' 2055' 50 @ 3962' 11587' 8800' SS 113-3/8" CSG, 72#, L-80, ID = 12,347" I ITOP OF 7" Scab Lnr 1--1 4000' 17" Scab Liner, 26#, L-80 1- Minimum ID = 3.725" @ 10586' 4-1/2" OTIS XN NIPPLE TOPOF7" LNR H 10567' 4-1/2"TBG, 12,6#. L-80, ,0152bpf, ID=3,958" H 10622' 19-5/8" CSG. 47#, L-80, ID = 8,681" H 10827' I ÆRFORA TION SUMMARY REF LOG: BHCS ON 09/26/87 ANGLE AT TOP ÆRF: 49 @ 11508 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 11508 - 11515 S 06/18/99 3-3/8" 4 11560 - 11575 S 06/18/99 3-3/8" 6 11575 - 11595 0 11/25/99 3-3/8" 10 11599 - 11620 0 08/23/99 3-3/8" 10 11630 - 11659 0 08/23/99 3-1/8" 4 11664-11675 0 07/03/99 3-1/8" 4 11682-11697 0 07/03/99 1 PBTD 1 11756' I 7" LNR, 26#, L-80, ,0383 bpf. ID = 6.276" 1 11800' DATE 09/30/87 08/16/03 01/07/06 RBI BY COMMENTS ORIGINAL COM PLETION JLA/KK WAIVER SAFETY NOTE corvvPJC WAIVER SFTY NOTE UPDATE DATE K-14 PROPOSED RBI BY COMMENTS SA~OTES: CRETACEOUS LEAK *** PRO.i-ION CASING LEAK. OPERATING LIMITS: MAX lAP = 500 PSI; MAX OAP = 1000 PSI (01/07/06 WAIVER) *** 2000' H4-1/2" HES X NIP, ID = 3,813" I ST MD 4 TBD 3 TBD 2 TBD 1 TBD GAS LIFT MANDRELS lVD DBI TYÆ 41/2"x1" 41/2"x 1" 4 1 /2" x 1" 4 1/2" x 1" H4-1/2" HES X NIP, ID = 3,813" 1 1--17" X 4-1/2" Baker S-3 PKR, 13Cr H4-1/2"HESXNIP,ID=3,813" I 1-14-1/2" 13-Cr 80 TBG, Vam Top 10484' HTBG SEAL ASSY SBR 1 10500' H 9-5/8" X 4-1/2" TIW PKR I 10547' H4-1/2" OTIS X NIP, ID = 3.813" 1 10586' H4-1/2" OTIS XN NIP. ID = 3,725" 10622' H4-1/2" TBG TAIL ID = 3,958"1 10626' H ELMD TT LOGGED 10/30/87 1 10975' -17" MARKER JOINT 1 11730' H FISH - KINLEY CUTTER I ffiUDHOE BA Y UNIT WELL: K-14 ÆRMIT No: '1870950 API No: 50-029-21752-00 SEC 4, T11 N, R14E. 1909' FNL & 4106' WEL BP Exploration (Alaska) . . Page 1 of 1 Maunder, Thomas E (DOA) From: West, Howard J [Howard.West@bp.com] Sent: Tuesday, July 31, 20074:18 PM To: Maunder, Thomas E (DOA) Subject: RE: K-14 (187-095) Tom, I apologize for not including the required cement volume, I will keep that in min and pass it on to the others. 190 bbls of cement will be pumped. This is based on the annular volume of 7" x 9 5/8" from 10,460 MD to 4,000 MD plus 25 bbls. Doyon 16 will perform the workover portion and Nordic 1 will do the sidetrack. The stack used during the workover operation will be Doyon 16's typical three ram stack with 3-1/2" x 6" pipe rams. If you have any other questions / comments, please let me know. Thanks, Howard ~~----_._~._._-~-- ._---_.- ----..----- From: Reem, David C Sent: Tuesday, July 31, 2007 12:21 PM To: West, Howard J Subject: FW: K-14 (187-095) Howard, pis respond to Tom's questions..... _~<_·____,__ü_~__..__.~_~,___ From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov] Sent: Tuesday, July 31,2007 12:19 PM To: Reem, David C Subject: K-14 (187-095) Dave, Got your call that there is a workover planned prior to the coil sidetrack. A few other questions... 1. Would you please provide cement volume information for the scab liner? For future reference, this is an item that should be included fo similar operations in the future. Please pass this on to your colleagues. 2. What rig will be performing the work? Win Nordic 1 do both workover and coil sidetrack? 3. What stack configuration is proposed? Call or message with any questions. Tom Maunder, PE AOGCC 8/1/2007 . ~1f~1fŒ (ID~ ~~~~æ!Æ . AI,A~1iA. OIL AlQ) GAS CONSBRVATION COMMISSION SARAH PALIN, GOVERNOR 333 W. 7th AVENUE. SUITE 100 ANCHORAGE. ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Abby Higbie CT Drilling Engineer BP Exploration Alaska, Inc. SCANNED JUL 2 7 2007 PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU K-Í:~t.i·-~·'1_oq5 Sundry Number: 307-245 \1:;) I Dear Ms. Higbie: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may me with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED this zÇday of July, 2007 Enc!. (Jag "1h"()1 . ~ v .. STATE OF ALASKA 7-/9-~ ALASKA Oil AND GAS CONSERVATION COMMISSION A- ""':>, APPLICATION FOR SUNDRY APPROVAL 20 MC 25 280 EiVED 'i !' ,JuL 1 9 Z007 & COrlS. CŒmmissíon ., ..L, '''^ ;-".>,. " iJ; 1. Type of Request: 181 Abandon o Suspend o Operation Shutdown o Perforate o Time Extension o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. t8:I Development D Exploratory 187-095 - 3. Address: D Service D Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21752-00-00 ~ 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU K-14 - Spacing Exception Required? DYes t8:I No 9. Property Designation: 110. KB Elevation (ft): 11. Field / Pool(s): - ADL 028303/ 53.2' I Prudhoe Bay Field / Prudhoe Bay Pool 112. .' '. ..... . < PRESENT WELL (;(.INUI r ~I .< . </\ ....... . . . .. .\/ .'. Total Depth MD (ft): Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 11800 . 8992 11756 8964 None 11730 Casino Lenoth Size MD TVD Burst CollaDse Structural Conductor 110' 20" 110' 110' Surface 2720' 13-3/8" 2720' 2678' 4930 2670 Intermediate 1 0830' 9-5/8" 10830' 8338' 6870 4760 Production Liner 1226' 7" 10574' -11800' 8156' - 8992' 7240 5410 Perforation Depth MD (ft): Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft): 11575' - 11697' 8846' - 8925' 5-1/2",17# x 4-1/2",12.6# L-80 10622' Packers and SSSV Type: 9-518" x 4-1/2" TIW packer packers and SSSV MD (ft): 10501' 13. Attachments: 14. Well Class after proposed work: t8:I Description Summary of Proposal D BOP Sketch D Exploratory t8:I Development D Service D Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: CommencinQ Operations: August 20, 2007 DOil DGas D Plugged ~ Abandoned 17. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Abby Higbie, 564-5480 Printed Name Abby Higbie Title CT Drilling Engineer 1'1 . ~ Datel J I1loÎ Prepared By Name/Number: Signature L.:;/·e . . Phone 564-5480 Terrie Hubble, 564-4628 ;/<--" Commission Use Onlv 1 Sundry Number: ...307 · ~,!"/'l:) Conditions of approval: Notify Commission so that a representative may witness D Plug Integrity I$...BOP Test D Mechanical Integrity Test D Location Clearance Other: )ÇDO \>~~\ \7,a Y' ~<;>\-- ú.~ ~ \O-t--~ RBDMS BFL JUL 2 6 Z007 Subsequent Form Required: ~\J'm1!! ~ W~MMISSIONER APPROVED BY Date 1-...],~ ~ Approved By: THE COMMISSION Form 10-403 Revised 06/2006 l/ V '---' Submit In Duplicate ORIGINAL ~ ~ø;> . . Obp To: Tom Maunder Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Abby Higbie CTD Engineer Date: July 12, 2007 Re: K-14 Sundry Approval CC: Well File Sondra Stewman/Terrie Hubble Sundry approval is requested to prepare K-14 for a sidetrack. Well K-14 was a vertical ZlB/Z2 well completed in 1987. The well produced full time through 1990 when a CNL log indicated a gas underrun to Zl and a thick oil lens remaining in Z2. Adperfs were shot in Z2 OL in 1990 and dominated production. It remained full time until 1993 then went on cycle. Lower Z2 was then perforated and those perfs came on at 3000 BOPD full-time for several months the returned to cycle production. Recent cycle trends are deteriorating as Z2 recharge is showing signs of depletion. Total cumulative production to date is ~5.5 MMBO. REASON FOR SIDETRACK: K-14 is a cycle well with deteriorating on-time. The sidetrack, K-14A, will exit the existing 7" liner above the perfs in Z2 to access new Zl!Z2A reserves. The existing perforations will be isolated by the liner cement job. A schematic diagram of the proposed sidetrack is attached for reference. Pre-Rig Work: (Scheduled to begin August 20th, 2007) 1) S Passed tubing caliper inspection 2) 0 Dummy GLVs 3) 0 Passed MIT -IA and MIT -OA. 4) 0 AC -LDS; AC-PPPOT-IC, T 5) S Run dummy whipstock drift _ \ 6) E Set4W'x7"WSatl1220' \ ~ D 7) 0 Perform injectivity test \S 0- ~ \ ~ ú..- 8) C Pump 15.8 ppg cement down squeeze past WS to isolate existing perfs-25bbl t 9) 0 PT cement plug to 2000 psi c.().<;.\",~ ~~.\\.....~\- ~~~ 10) 0 PTMV, SV, WV ....... ~ f'~-' '\ , t 11) 0 Blind and bleed lines - \" 7\. ~b\<-:, 12) 0 Remove wellhouse, level pad ork: (Scheduled to begin October 15th, 2007) 1) ordic 1 and test BOPE to 250psi low and 3500psi high. 2) Mill3.80 . win 7" liner at 11220' 3) Drill Build: 4.125' , 5' (45 deg/100 planned) 4) Drill Lateral: 4.125" OH, 84 e /100 planned) 5) Run 3-3/16" solid liner, cement 6) Cleanout liner and MCNL/GR/CCL log 7) Test liner lap to 2000 psi 8) Perforate liner per asset instructions (~200') 9) Freeze protect well, set BPV and RDMO Post-Rig Work: 1) Install well house, GLM and attach production lines 2) Pull BPV ,~~', \~~ ~\L~ \~ \N:..O~~\~~ \)~ Q\;"--~ Ni:».> ~,~ !f3-9'M'?~~" 6"CA N WCBIOY AXELSON 53.20' 25.62' 2055' 50 @ 3962' 11587' 8BOO' SS K-14 . 5-112" TBG, 17#, L-BO, .0232 bpf, ID = 4.892" TOP OF 4-112" TBG 113-3/8" CSG, 721#, L-80, ID = 12.347" H 2719' Minimum ID = 3.725" @ 10586' 4-1/2" OTIS XN NIPPLE TOP OF 7" LNR 10567' 4-112" TBG, 12.61#, L-BO, .0152 bpf, ID = 3.958" 10622' 9-518" eSG, 47#, L-80, ID = 8.681" 10827' ÆRFORA1lON SUMMARY REF LOG: BHCS ON 09/26/87 ANGLEATTOPÆRF: 49 @ 11508 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OpnlSqz DATE 3-3/8" 4 11508 - 11515 S 06118/99 3-3/8" 4 11560 - 11575 S 06/18/99 3-3/8" 6 11575 - 11595 0 11/25/99 3-3/8" 10 11599 - 11620 0 08123199 3-3/8" 10 11630 - 11659 0 08123/99 3-118" 4 11664-11675 0 07103199 3-118" 4 11682-11697 0 07103199 I PBTD I 11756' I 7" LNR, 261#, L-80, .0383 bpf, ID = 6.276" H 11800' DATE REV BY COMIIENTS 09130/81 ORIGINAL COMPLETION 07/16101 RNlKAK CORREC1lONS 11/16102 ASlKAK ÆRF CORRECTIONS 08116103 CMOfTLP K8 8...EV A I¡[) MAX ANGLE 08116103 JLAIKK WAIVER SAFETY NOTE DATE REV BY COM\IENTS SAFETY NOTES: CRETACEOUS LEAK·- PRODUCTION CASING LEAK. OPERATING UMITS: MAX lAP = 500 PSI; MAX OAP = 1000 PSI (08/16103 WAlVER)-· 1978' -15-112" OTIS HRQ SSSV LAND NIP, ID = 4.562" 2600' 5-112" X 4-112" XO Me 3104 7517 10237 10345 GAS LIFT MANæB...S lVD DEV 1YÆ VLV LATCH PORT DATE 2942 38 OTIS RA 5967 45 OTIS RA 7870 46 OTIS RA 7943 46 OTIS RA 10425' 4-112" BKR L SLIDING SLV, ID = 3.812" 10484' HTBG SEAL ASSY SBR I 10500' -19-518" X 4-112" TIW PKR 10547' 4-112" OTIS X NIP, ID = 3.813" 10586' 4-112" OTIS XN NIP, ID = 3.725" 10622' -14-112" TBG TAIL ID = 3.958" I 10626' H ELMD TT LOGGED 10130/87 I 10975' 7" MARKER JOINT 11730' H FISH - KINLEY CUTTER PRUDHOE BAY UNIT W8...L: K-14 ÆRMT No: 1870950 AA No: 50-029-21752-00 SEC 4, T11N, R14E. 1909' FNL & 4106' We. BP Exploration (Alas ka) PERFORA TIQNSUMMARV REF LOO: BHCS ON 09128/87 ANGtEATTOPPERF: 49@11508 11508" 11515 11560-11575 11575 - 11595 11599-11620 11630 - 11659 11664 - 11675 11682 - 11697 3-1/8" SAÆlYNOTES: PRODUCTION MAX lAP =: 500 (01/11/03 WANER) aU BP . . Review of Sundry Application 307-2245 BP Exploration (Alaska) Inc. Well Prudhoe Bay Unit K-14 Prudhoe Bay Field, Prudhoe Oil Pool AOGCC Permit 187-095 Requested Action: BP Exploration (Alaska) Inc. (BPXA) proposes to plug the existing well to prepare it for sidetracking. Recommendation: I recommend approval of BPXA's request. Discussion: Well K-14 was originally drilled and completed in 1987. The well produced essentially continuously until early 1994 when it began to be cycled. Cumulative production is about 6.3 mmstb of oil. During the months when the well is produced it will typically flow for 15 to 20 days and produce about 700 stb/d at a GaR of 50,000 to 60,000 scf/stb. The well is usually produced each month, but can go several months without being brought into production. The K pad is currently producing approximately 6,000 to 7,000 stb/d at a GaR of 35,000 to 40,000 scf/stb. The oil production rate for the subject well is comparable to some of the other wells on the, but the GaR is significantly higher than the majority of the regular producers, many of which produce at GaRs of 20,000 to 30,000 scf/stb. BPXA's application states that the current well is a vertical producer completed in the Z 1 B and Z2 sands. The proposed sidetrack would be completed in the Z 1 and Z2A zones. Conclusion: Although the subject well does produce well, when it is cycled on, the fact that it produces at a high GaR means that it is regularly taken off production due to the limited facility capacity and lower GaR wells are preferentially produced. Abandoning the existing perforations and targeting areas of the reservoir that should produce with a lower GaR, and thereby allowing the well to more regularly contribute to production, should help to more efficiently recovery the reserves. D.S. Roby ~ Reservoir Engi er July 20, 2007 · '... "'...., v ¡;;; u '\ STATE OF ALASKA ') JAN 2 4 2006 ALA~. .Á OIL AND GAS CONSERVATION COMrvl.-,~ION REPORT OF SUNDRY WELL OPERATIONgIt'aska Oil & Gas Cons. Commission 1. Operations Abandon D Repair Well D Plug Perforations [] Stimulate D Other ~nthordUtJ Performed: Alter Casing D Pull Tubing D Perforate New Pool D WaiverD Time Extension D Change Approved Program D Operat. Shutdown D Perforate D Re-enter Suspended Well D 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development I;?i Exploratory Di 187-0950 3. Address: P.O. Box 196612 StratigraphicC: Service 6. API Number: Anchorage, AK 99519-6612 50-029-21752-00-00 7. KB Elevation (ft): 9. Well Name and Number: 53.2 KB 8. Property Designation: ADL-028303 11. Present Well Condition Summary: Total Depth measured 11800 feet true vertical 8992.05 feet Effective Depth measured 11756 feet true vertical 8963.6 feet Casing Length Size MD Conductor 80 20" x 30" 30 - 110 Surface 2690 13-3/8" 72# L-80 29 - 2719 Production 10799 9-5/8" 47# L-80 28 - 10827 Liner 1233 7" 26# L-80 10567 - 11800 Perforation depth: Measured depth: 11575 - 11697 True Vertical depth: 8845.75 - 8925.46 SCANNEJ) ,Jt\N 21, !j,! 2.nOh Representative Daily Average Production or Injection Data Gas-Mcf I Water-Bbl I Casing Pressure Tubing pressure SHUT-IN 46764 I 29 I 0 1088 15. Well Class after Droposed work: Exploratory C DevelopmentR' Service r Tubing: (size, grade, and measured depth) 5-1/2" 17# 4-1/2" 12.6# Packers and SSSV (type and measured depth) 4-1/2" TIW Packer 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Oil-Bbl Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations 902 K-14 10. Field/Pool(s): Prudhoe Bay Field/ Prudhoe Bay Oil Pool Plugs (measured) None Junk (measured) 11730 TVD Burst Collapse 30 - 110 29 - 2677.56 4930 2670 28 - 8335.55 6870 4760 8150.64 - 8992.05 7240 5410 L-80 L-80 28 - 2500 2500 - 10622 10500 RBDMS 8Fl ,IAN :2 5 2006 16. Well Status after proposed work: Oil ¡;¡ Gas r WAG L 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. x Contact Sharmaine Vestal Printed Name Sharm~ine,vestal "' / Slgnature~ t./l1-t£c--~"--~~ GINJ r WINJ r WDSPL r Sundry Number or N/A if C.O. Exempt: N/A Title Data Mgmt Engr Phone 564-4424 Date 1/23/2006 Form 10-404 Revised 04/2004 ORIGINAL Submit Original Only ) ) K-14 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE I SUMMARY 12/17/2005 ***WELL FLOWING ON ARRIVAL*** DRIFT TO 11609' SLM W/ 3.65" CENT, S.B., START IN HOLE W/ PDS CALIPER ***CONT ON 12-18-05 WSR*** 12/18/2005 ***CONT FROM 12-17-05 WSR*** RUN PDS CALIPER LRS PUMP 200 BBLS LOAD WELL ATTEMPT TO SET PX PLUG BODY ***CONT ON 12-19-05 WSR*** 12/19/2005 ***CONT FROM 12-18-05 WSR*** MAKE SEVERAL ATTEMPTS TO SET PX PLUG PLUG BODY ***CONT ON 12-20-05 WSR*** 12/20/2005 ***CONT FROM 12-19-05 WSR*** SET AND PULL PX PLUG BODY AND PRONG @ 10528' SLM, FOUND RETAINER PIN FROM 4.5" GU ADAPTER IN PLUG BODY ***CONT 12-21-05 WSR*** 12/21/2005 ***CONT FROM 12-20-05 WSR*** SET 4.5" PXN PLUG @ 10565' SLM, ( PRONG 96" OAL, 1 3/4" FN.. 750 PSI ON WELL) BLEED WELL DOWN 350 PSI, GOOD TEST, LRS TESTING PLUG TO 3000 PSI, GOOD TEST, BLEEDTUBE DOWN TO 500 PSI ***WELL S/I ON DEPARTURE*** ( NOTIFIED PAD OPERATOR) 12/22/2005 T/I/O=630/0/10. SI. Bleed WHP's to 0 psi (pre-CAM-PPPOT). TBG FL @ 456'. Bled OAP from 10 psi to 0 psi inn 20 minutes. Bled TBG pressure from 630 psi to 10 psi in 3.5 hours. TBG pressure remained @ 10 psi for 45 minutes while bleeding. Monitored 30 minutes. TBG pressure increased 50 psi. Heater is on well. Final WHPs=60/0/0 12/23/2005 T/I/O=88/0/VAC Temp=SI WHP's post-bleed (pre-Cam PPPOT). Overnight, the TBGP increased 28 psi, the lAP remained unchanged and the OAP went on a V AC. Heater is still on well. 12/25/2005 T/I/O = 120/0/vac. Temp = SI. Bleed WHP's to 0 psi (pre Cam PPPOT). Bled TBG pressure to 3 psi in 4 hrs (all gas). SI, monitored for 30 min. TBG pressure increased to 43 psi. Final WHP's 43/0/vac. 12/27/2005 T/I/O=150/0NAC Temp=SI Bleed WHP's to 0 psi (pre-Cam PPPOT-T&IC) with Cam on location. TBGP increased 107 psi overnight. TBG FL @ 456'. Bled TBG pressure from 150 psi to 0 psi in 90 minutes. Final WHP's=O/O/V AC. 12/28/2005 ***WELL WAS SHUT-IN UPON*** (Pull PXN plug) JOB IN PROGRESS. RUNNING IN HOLE WITH BELLGUIDE. WRS CONTINUED ON 12/29/2005 12/29/2005 ***WRS CONTINUED FROM 12/28/2005*** PULLED P-PRONG @10,564' SLM. PULLED PXN PLUG BODY @10,568' SLM. RDMO. ****LEFT WELL SHUT-IN**** FLUIDS PUMPED BBLS o TOTAL BP Exploration (Alaska) Inc. Post Office Box 196612 PRB-24 Anchorage, Alaska 99519-661 bp March 6, 2003 Mr. Tom Maunder, P.E. Alaska Oil & Gas Conservation Commission 333 W. 7th Ave. Anchorage, Alaska 99501 Subject: K-14 (PTD 1870950) Application for Sundry Cancellation Dear Mr. Maunder: Attached is the Application for Sundry Cancellation form 10-404 for well K-14. This request is for approval to cancel the existing Sundry. A description summary of proposal and wellbore schematic is included. If you require any additional information or clarification, please contact either John Cubbon or me at (907) 659-5102. Sincerely, Joe Anders, P.E. Well Integrity Engineer Attachments SCANNED MAR n ? ?00~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _ CANCEL VARIANCE Pull tubing _ Alter casing _ Repair well _ Other ,X 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box196612 Anchorage, AK 99519-6612 5. Type of Well: Development _X Exploratory_ Stratigraphic__ Service_ 4. Location of well at surface 1909' FNL, 4106' FEL, Sec. 04, T11N, R14E, UM At top of productive interval 2750' FNL, 3811' FEL, Sec. 09, T11N, R14E, UM At effective depth 3224' FNL, 3860' FEL, Sec. 09, T11N, R14E, UM At total depth 3355' FNL, 3870' FEL, Sec. 09, T11N, R14E, UM (asp's 671441, 5975311) (asp's 671892, 5969200) (asp's 671855, 5968725) (asp's 671849, 5968593) 12· Present well condition summary Total depth: measured true vertical 11800 feet Plugs (measured) 8992 feet 6. Datum elevation (DF or KB feet) RKB 53 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number K-14 9. Permit number / approval number 187-095 //,_~OO - 10. APl number 50-029-21752-00 11. Field/Pool Prudhoe Bay OilPool Tagged TD @ 11626' (12/28/2001) Effective depth: measured true vertical Casing Length Conductor 110' Surface 2691' Intermediate 10799' Sidetrack Liner 1233' 11626 feet Junk (measured) 8879 feet Fish - Kinley Cutter @ 11730'. Size Cemented Measured Depth True Ve~icalDepth 20" 72 c.f. 138' 138' 13-3/8" 4185 c.f. 2719' 2678' 9-~8" 2375 c.f. 10827' 8336' 7" 414 c.f. 10567'-11800' 8840'-8992' Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Open Perfs 11575'-11595', 11599'-11620', 11630'-11659', 11664'-11675', 11682'-11697'. Sqzd Perfs 11508'-11515', 11560'-11575'. Open Perfs 8846'-8859', 8862'-8875', 8882'-8901', 8904'-8911', 89.16'-8925'. Sqzd Perfs 8802'-8806', 8836'-8846'. 5-1/2" 17# L-80 TBG @ 2500'. 5-1/2" x 4-1/2" XO @ 2500'. 4-1/2" 12.6#.L-80 TBG@ 10622'. Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" TIW PKR @ 10500'. 5-1/2" Otis HRQ SSSV Landing Nipple @ 1978'. 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations _ 16. Status of well classification as: Oil _X Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge· I~ ~ Title: Well Integrity Engineer SCANNED MAR n 7 2003 Form 10-404 Rev 06/15/88 · Questions: call Joe Anders 907-659-5102. Date: Prepared by DeWayne R. Schnorr 564-5174 SUBMIT IN DUPLICATE K-14 Description Summary of Proposal 03105/03 PTD# 187095 Sundry~ 300-009 dated 02/27/00 This is a request to cancel the AOGCC Sundry dated 02/27/00. Reason for cancellation: K-14 is a cycled producing well with a production casing leak between 7400'-7500'. The tubing demonstrates competency based on the pressure differential between the Tubing and IA pressure from the TIO plot. Recent Well Events: > 02/20/03: MITOA to 3000 psi PASSED TREE = 6" CAMERON SAFETY NOTES: CRETACEOUS LEAK K-14 ACTUATOR = AXB. SON KB, ELEV = 53.22' BF. ELEV = 25.62' KOP = 2055' UaxAn la= 50~3879' O i 1978' H5-1/Z'OTISFRQSSSVLANDNIP, ID=4.56Z' Datum MD = 11587' Datum TVD = 8800' SS I 151/Z'Tm, 17#, L-80,.0232bpf, lD:4.892'H 2500' I I~ITOPOF4-1/2"'I'BGH 2500' ~ k GAS LIFTMANDRFIS 113-3/8"CSG, 72#,L-80,1D=12.347"i i 2719' ST MD 3VD DEV TYPE VLV LATCH PORT DATE ------ 4 3104 2942 38 OTIS RA I 3 7517 5967 45 OTIS RA 2 10237 7870 46 OTIS RA 1 10345 7943 46 OTIS RA Minimum ID = 3.725" @ 10586' 4-1/2" OTIS XN NIPPLE I I ~ I' 10484' ~-~TBGSEALASSYSBRI ~ '1 10500' H9-5/8"X4-1/2"TIWPKRI X I.' ~' 10547' H4-1/Z'OTISXNP, ID=3.013"I ITO o. I--[ lO5 ' ] I.! I! 10586' H 4-1/2" OTIS XN NIP, ID:3.725" I I' 10622'H4-1/z'TBG TAIL ID: 3.958"I 14-1/2"TBG, 12.6~, L-80, .0152bpf, ID= 3.958" I t 10622' r9.5/8,, CSG, 47#, L-80, ID= 8.681" H 10827' i PERFORATION SUIVIVIA RY REF LOG: BHCS ON 09/26/87 A NGLEAT TOP PERF: 49@11508 Note: Refer to R'oducf~on DB for historical perf data '1 SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 11508- 11515 S 06/18/99 3-3/8" 4 11560- 11575 S 06/18/99 ' II 3-3/8" 6 11575- 11595 O 11/25/99 3-3/8" 10 11599 - 11620 O 08/23/99 3-3/8" 10 11630 - 11659 O 08/23/99 3-1/8" 4 11664- 11675 O 07/03/99 3-1/8" 4 11682- 11697 O 07/03/99 I ; ~1~--[ 11730' ~FISH-KINLEYCUTTER I ~ 11756' I 17"LNP, 26#,L80,.0383bpf, ID=6.276"H 11800' ,I · DATE REV BY COIViMENTS DATE REV BY COMIVlENTS PRUDHOEBAY UNIT 09/30/87 ORIGIN& L CObPLETION WELL: Ko 14 02/22/01 SIS-SLT CONVERTEDTOCANVAS PERMITNo: 1870950 03/05/01 SIS-MD FINAL ARNo: 50-029-21752-00 07/16/01 RN/KAK CORRECTIONS SEC 4, Tll N, R14E 11/16/02 AS/KAK PEF~ CORRECTIONS BP Exploration (Alaska) SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 4 11508- 11515 S 06/18/99 3-3/8" 4 11560- 11575 S 06/18/99 3-3/8" 6 11575- 11595 O 11/25/99 3-3/8" 10 11599- 11620 O 08/23/99 3-3/8" 10 11630 - 11 659 O 08/23/99 3-1/8" 4 11664- 11675 O 07/03/99 3-1/8" 4 11682- 11697 O 07/03/99 ALAS,~A OIL AND ~,,~' ~;~I~I~'-~I~,'~;ON COMMISSI.._..ON REPORT '_,F SUNDRY WELL OP,.... ,- ATIONS 1. Operations performed: Operation shutdown__ Stimulate__ Plugging__ Pull tubing__ Alter casing Repair well Perforatex Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchora_cle, Alaska 99519-6612 4. Location of well at surface 1909' SNL, 4106' WEL, Sec. 4, T11N, R14E At top of productive interval 2750' SNL, 3811' WEL, Sec. 9, T11N, R14E At effective depth 3322' SNL, 3867' WEL, Sec. 9, T11N, R14E At total depth 3356' SNL, 3852' WEL, Sec. 9, T11N, R14E 5. Type of Well: DevelopmenlX Exploratory __ Stratigraphic __ Service __ 6. Datum elevation (DF or KB) K~E = 53.22 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number K-14 (23-9-11-14) 9. Permit number/approval number 87-95 / 10. APl number 50- 029-21752 11. Field/Pool Prudhoe Off Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 80' Surface 2684' Intermediate 10802' Production Liner 1226' Perforation depth: measured 11800' 8991 Size 20" 13-3/8" 9-5/8" 7" feet Plugs (measured) feet feet Junk (measured) feet Cemented 8 cuvds concrete 4185 cu fl ArcticSet II 2375 cu fl Class G 414 cu fl Class G true vertical Tubing (size, grade, and measured depth~l-1/2" 12.6# @ 10485' MD 5-1/2" 17# @ 1997' MD Packers and SSSV (type and measured deptl'C?acker @ 10501' MD SSSV @ 1971' MD Measured depth 110' 2720' 10830' 11800' True vertical depth 110' 2681' 8337' 8991' ORIGINAL 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressur6 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure 1273 20619 27 0 1372 20134 26 0 Tubing Pressure 2102 2112 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Gas Suspended Service 17. I hereby.,6tertif.,Chat ~l~e fore,~C)ing is true~a,p,C'...correct to the best of my knowledge, Signed Z/¢~///..f,'../C~.u, _.~ Title Technical Assistant IV Form 10-404 RCe~, 0~/'~ 5'/8'8'''I - Date/~ ,~~_~//'~' I ~' SUBMIT IN Dt-J'PLICAT...~~ K-14 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 06/18/99 A Sandback Cement Squeeze was performed using the following fluids: SUMMARY June 17, 1999: MIRU DS CTU #2 & BP Squeeze Unit. Pick up sand dump nozzle. Kill well with FSW. RIH while pumping down coil to maintain fluid column. Dry tag at 11737' (corrected to WL tag 5/7/99). Lay sand plug 11737' to 11590'. Tag top of sand after washing liner and allowing for settling @ 11590'. Second tag at 11590' (within requested window). POH. Stand back injector. SDFN June 18, 1999: Pick up Joust nozzle and stinger. RIH. Tag sand top at 11590'. Pick up 10' and flag pipe. Injectivity with FSW-2 bpm @ 520 psi. Cool down wellbore with FSW. Pump 10 bbls of acid (described below) while reciprocating through perforated intervals 11508' to 11580'. Injectivity before acid = 2 bpm @ 645 psi. Injectivity after acid = 2 bpm @ 685 psi. Overflush with 50 bbls FSW. Lay in cement with additives described below. Ramp pressure to 3000 psi. Placed approximately 3.5 bbls of cement behind pipe. Held squeeze for 45 minutes, pressure dropped from 3000 psi to 2900 psi. WCTOC - 11136'. Reduce pressure to 500 psi, contaminate excess cement with biozan and circulate out. Spot 20 bbls 10% TEA over perforations. Chase out contaminated cement with slick filtered sea water at 80%, washing jewelry thoroughly. Wash tree and freeze protect tubing with 55 bbls MEOH. Observe WHP @ surface. Holding 500 psi. Leave pressure on well, RD CTU #2 and Squeeze Unit. Fluids Pumped BBLS. Description 55 MeOH 1228 SW 21 Gel (sand dump) 10 Acid (see composition below) 24 Biozan I'?~/ 0 5 1999 20 10% TEA 22 Cement (see composition below) Ala~0il&GasCons. Commissi0n 1380 Total Pumped An~ho~af~e K-14 DESCRIPTION OF WORK COMPLETED REPERF 08/23/99 SUMMARY The following interval were reperforated using 3-3/8" guns, 6 SPF, random orientation and 60° phasing. 11600'-11620' MD 11630'-11650' MD RECEIVED '3'J 05 1999 Alaska Oil & Gas Cons. Commi~on Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 11 July 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: · WELL H-O O/ W 34 (41-20-11-12 lob - ( 11-13) DESCRIPTION 1 PFC/PERF FINAL BL+RF 1 PDK/GR FINAL BL+RF 1 PDK/GR FINAL BL+RF 1 PLS FINAL BL+RF 1PFC/PERF FINAL BL+RF ECC No. Run # 1 1076.01 Run # 1 3772.01 Run # 1 5602.03 Run # 1 6049.06 Run # 1 6447.02 Please sign and return to: Attn. Rodney D. Paulson  B Street ~ Sui~te 201 / · Anchorage, AK 99518 Received by:/- /~,fi4/~ / ,~/_~,/~/~ Date: STATE OF ALASKA ALASt~'~'~OIL AND GAS CONSERVATION COMMISSIC~--' REPORT SUNDRY WELL OPE,,ATIONS 1. Operations performed: Operation shutdown __ Stimulate__ Plugging__ Pull tubing Alter casing Repair well_ Perforate_X,, .~ Other_ __ {/;~') , 6. Datum eleva/ii~ .~:~F pr KB) 7. Unit or Prope~ ng~~ ~ Prudhoe Bay Unit /~'~ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1909'SNL, 4106' WEL, Sec. 4, T11N, R14E At top of productive interval 2750' SNL, 3811' WEL, Sec. 9, T11N, R14E At effective depth 3322' SNL, 3867' WEL, Sec. 9, T11N, R14E At total depth 3356' SNL, 3852' WEL, Sec. 9, T11N, R14E 5. Type of Well: Development Exploratory Stratigraphic Service 8. Well number K-14(23-9-11-14) 9. Permit number/approval number 87-95 / 10. APl number 50- 029-21752 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 80' Surface 2684' Intermediate 10802' Production Liner 1226' Perforation depth: measured true vertical 11800' feet 8991 feet feet feet Size Plugs (measured) Junk (measured) Cemented 20" 13- 3/8" 9-5/8" Measured depth True vertical depth 8 cu yds concrete 110' 110' 4185 cuft ArcticSet II 2720' 2681' 2375 cuft Class G 10830' 8337' 7" 414 cuft Class G 11800' 8991' Tubing (size, grade, and measured depth) 4-1/2" 12.6# @ 10485'MD 5-1/2" 17# @ 1997'MD Packers and SSSV (type and measured depth) Packer @ 10501' MD SSSV @ 1971' MD 13. Stimulation or cement squeeze summary Intervals treated (measured) 23 1996 14. Treatment description including volumes used and final pressure Alaska Oil & (;as Cons. Commission An~.hnrnn~. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 1273 20619 27 0 2102 1372 ~ 20134 26 0 2112 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run __ Daily Report of Well Oper~ons Oil Gas Suspended 17. I here~/ce~ify tha~t the f~going is true ~d~¢orrect to the best of my knowledge. S ' g n e d ~/-;.~/~/.~/~.~,¢~ ~/~"i//<,Sf Title TechnicalAssistantll, Form 10-404 Rev 06/15/88 ~' Service ,, Date SUBMIT IN DUPLICATE WELL K-14(23-9-11-14) Addperf 7/05/95 The following additional interval were perforated using 3 3/8" guns, 4 SPF, random orientation and 60° phasing. 11560'- l1580'MD LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Reference: PRUDHOE BAY NORTH SLOPE, AK Date: RE: 27 June 1995 Transmittal of Data Enclosed, please find the data as described below: ECC #: 6447.01 Sent by: PRIORITY MAIL Data: LDWG Tapes/Diskettes: 1 LDWG TAPE + LIS Run # 1 Please sign and return to: Attn. Rod~_ At l~~el ine Services /5600 B Street Anchorage, AK 995138 Received by: ~ ., Date: '~0//~ LARRY GRANT w~ Date: 22 June 1995 Attn, ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ~,C~\-' ~ RE: Transmittal of Data AK, 99501. ~v-'~0Q . ,.. ,,,e,': y: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: (4J-1~6-11-13) 1 PFC/PERF FINAL BL+RF ~ H-08 Run # 1 4990.03 1PFC/PERF FINAL BL+RF Run # 1 1 CN/GR FINAL BL+RF 6245.06 Run # 1 6447.01 Please sign.and return to: Attn. Rodn~~ atlas~ne Service/ ~_~~ree~  AnchOrage, AK 99518 Received by: Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 20 June 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL $~-04 (23-29-11-14) DESCRIPTION 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS/X-Y FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 CCL FINAL BL+RF 1 PAS/STP FINAL BL+RF FCC No. Run # 1 3901.03 Run # 1 5807.03 Run # 1 5904.02 Run # 1 6089.04 Run # 1 6236.01 Run # 1 6447.00 Please sign and return t~"~t_tn. Rodney A~s Wirel~de Services Suite/~~ Anchorage, A~ Recei ., BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :08/23/90 T#:81510 FROM- SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. ~¢ K-14 FM/Temp 08/13/90 #1 11280-11750 Camco 5" ~l R-18 Prod-F 08/06/90 #1 3000-9975 Camco 5" ~'W-12 Prod- F 08/08/90 #1 13550-13930 Camco 5" v'X-24 FM/Temp 08/13/90 #1 8980-9451 Camco 5" ~X-24 PITS 08/12/90 #1 9000-9455 Camco 5" V' Y-09 PITS 08/12/90 #1 10050-10570 Camco 5" ~' Z-32 PITS 08/09/90 # 1 9950-11250 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RECEIVED A U G 2 9 1990 Alaska Oil & Gas Cons. comm'tssion Anchorage i'~..~/, ~.A OIL AND GAS CONSERVATION CO, REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1909'SNL, 1174'EWL, Sec. 04, T11N, R14E, UPM At top of productive interval 2750'SNL, 1469'EWL, Sec. 09, T11N, R14E, UPM At effective depth 3284' SNL, 1433' EWL, SEC. 09, T11N, R14E, UPM At total depth 3357' SNL, 1428' EWL, Sec. 09, T11N, R14E, UPM Repair well 5. Type of Well: Development X Exploratory Stratigraphic Service Other 6. Datum elevation (DF or KB) KBE = 53.22 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number K-14 (23-09-11-14) PBU 9. Permit number/approval number 87-95 / 90-253 10. APl number 50- 029-21752 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 11800'feet 8991 feet 11704 feet BKB 8929feet Plugs (measured) Junk (measured) fish at 11704' WLM (04/90) Length Size Cemented Measured depth True vertical depth 110 20 8 c.y. 138 138 292 13 3/8 4185 c.f. 2720 2681 10802 9 5/8 2375 c.f. 10830 8337 1226 7 414 c.f. 105 74-10800 8155-8991 measured 11508'-11515', 11599'- 11620', 11630'-11653', 11664'-11675', 11682'-11697' true vertical subsea 8747'-8872' (five intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 surface-2500', 4 1/2" L-80 2500'-10500' with 4 1/2" tailpipe to 10622' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 10500';5 1/2"SSSVat 1978' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure Gas Cons° Anch0rag~ 14. Prior to well operation Subsequent to operation Representative Daily Average Produ~ign or In!ev'-'tign Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 3751 10732 0 0 2130 9846 0 0 Tubing Pressure 109 119 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended 17. I hereby cex~y that the foregoing is true and correct to the best of my knowledge. Signed ~1~ '~, ?~/~,~ Title Supervisor Gravity Drainage F°~m 10-404 Rev 06/15/88 Service SUBMIT IN DUPLICATE WELL K-14 (23-09-11-14) PBU ADD'L. PERFORATION OPERATIONS The following additional interval was perforated April 21, 1990, using Schlumberger 3 3/8" carrier guns at 4 spf: 11508' - 11515' MD BKB (Ref. BHCS, 9/26/87) A lubricator was installed and tested to 3500 psi for all well work. The well was returned to production immediately following perforating operations, then tested. jam 5/24/90 m. BP EXPLORATION BP Exploralion (Alaska) Inc. 900 East Benson Boulevarcl P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO:. D IS TRIB UTION D a t e: 04/27 / 90 T#: 81127 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-dd45. C-04 Gamma Ray 04/15/90 # 1 10298-10388 Atlas 5" D-!4 ,,Collar 04/17/90 # 1 9300-9650 ,, Atlas 5" D-17 Perf 04/20/90 # 1 9750-10366 Sch 5" E-25 Prod-F 04/21/90 # 1 9500-11500 Sch 2" 5" H-08 CNL 04/18/90 # 1 8850-9424 S ~.h " 5" J-09 Perf 04/19/90 # 1 8300-9873 Sch 5" J-16 Perf 04/19/90 # 1 9300-9546 Sch 5" K-14 Perf 04/21/90 # 1 10300-11746 Sch 5" W-24 Tubing Cutter 04/22/90 # 1 8700-8930 8-m¥ ~ft.P,d 5" Distribution: ARCO CStEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVO[]~-...~ ~xr-x-w,.o# ~ASrAb ARCHIVES f,4A¥ - 2 1990 Nas.~ 0Il & Oas Cons. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 16, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well K-14 (23-09-11-14) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform remedial/capacity sustai~ment work on tke well. ~~Yo s very r~ y, R razier Supervisor Gravity Drainage RBF: JAM Enclosures (9) co: L. Burke (MB12-1) Well File RECEIVED Oil & Gas Cons. Commisslor~ Anchorage 1. Type of Request: STATE OF ALASKA A OIL AND GAS CONSERVATION COMM, ,~1 APPLICATION FOR SUNDRY APPROVALS Abandon Suspend ~ Alter casing ~ Repair well Change approved program .... 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1909'SNL, 1174'EWL, Sec. 04, T11N, R14E, UPM At top of productive interval 2750' SNL, 1469'EWL, Sec. 09, T11N, R14E, UPM At effective depth 3323' SNL, 1430' EWL, SEC. 09, TI 1N, R14E, UPM At total depth 3357' SNL, 1428' EWL, Sec. 09, T11N, R14E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Operation Shutdown Re-enter suspended well~ Plugging Time extension Stimulate Pull tubing ~ Variance Perforate X Other~ 5. Type of Well: 6. Datum elevation (DF or KB) Development X KBE ,, 53.22 AMSL feet Exploratory Stratigraphic 7. Service 11800' feet Plugs (measured) 8991 feet 11756 feet Junk (measured) BKB 8963 feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth 110 20 8 c.y. 138 292 13 3/8 4185 c.f. 2720 10802 9 5/8 2375 c.f. 10830 1226 7 414 c.f. 10574-10800 measured 11599'. 11620', 11630'-11653', 11664'-11675', 11682'-11697' Unit or Property name Prudhoe Bay Unit 8. Well number K-14 (23-9-11.14) PBU 9. Permit number 87-95 10. APl number 50- 029-21752 11. Field/Pool Prudhoe Oil Pool RECEIVED APR 1 8 ]990 Alaska Oil & Gas Cons, .Com~ True t~lalJJJajJl~t~ ...... 138 2681 8337 8155-8991 true vertical subset 8808'-8872' (four intervals) Tubing (size, grade, and measured depth) 5 1/2" L-80 surface-2500', 4 1/2" L-80 2500'-10500' with 4 I/2" tailpipe to 10622' Packers and SSSV (type and measured depth) 9 5/8" TlWpacker at 10500'; 5 1/2" SSSV at 1978' 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation April 1990 16. If proposal was verbally approved Oil X Gas Name of .~prover Date approved Service 17. I her,e.v~rtify;hat i~pre~ing is t,rue and correct to the best of my knowledge. Signed ~ ~ ./'~~. ~ Title Supervisor Gravity Draina~le 15. Status of well classification as: Suspended~ £ ' 0 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance ~ Mechanical Integrity Test ~ Subsequent form required 10-.. ~/-/' ORIGINAL SIGNED BY Approved by order of the Commission LONNIE C. SMITH Form 10-403 Rev 06/15/88 Commissioner Approved Copy Returned Date J Approval No. ~ Date 41 SUBMIT IN TRIPLIOATE WELL K-14 (23.09-11-14~ PBU ADD'L. PERFORATION PROPOSAL We propose to perforate the following additional interval during April 1990: 11508' - 11515' MD BKB (Ref. BHCS, 9/26/87) A lubricator will be installed and tested to 3500 psi for all well work. The well will be returned to production immediately following perforating operations, then tested. jam 4/12/90 APR 1 8 1990 ,.Alaska Oil & Gas Cons. Commission ,.~ Anchorat]e BOWEN PAC~OFF FLOW TUBES & PACKOFF ]~- HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE GREASE LINE FLOWLINE VALVE RISER GREASE /--" MANIFOLD GREASE PUMP .-GREASE RESERVOIR 'BOP BP EXPLORATION BP Exploration (Alaskal Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO ARCO E~ON PHILLIPS STATE OF ALASKA Date: 03/26/90 T#: 80978 SYSTEM Tape & Transmittal 0nly. ARCHIVES BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. · ~ /~--~ W-40 CH/TDT-P 03/08/90 Sch#73746 1600bpi Sch#73751 1600bpi #1 9904-10550 API#50-029-21776 #1 10796-11764 API#50-029-21752 Tape Pos.#06968 Tape Pos.#06969 Information Control Well Records LR2-1 J. Dietz/S. McCurry RECEIVED APR .[ 0 .Lq,q0 Oil & Gas Co,~s. Commission, Anchorage BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard RO. Box 196612 Anct~orage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 03/20/90 Transmittal: 80943 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If questions, please contact BP Well Records at (907) 564-4445. you have C-01 PERF 03/13/90 #1 8774-9100 Sch K-14 CNL-GR 03/12/90 #1 10800-11745 Sch M-10 CCL 03/15/90 #1 8440-9856 Atlas any St, 5" 5" Distribution: .ARCO CHEVRON EX/fON GEOSCIENCES MOBIL PHILLIPS RESERVOIR ~STATE OF ALAS..K~ ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevarct P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 11/28/89 Transmittal: 80626 From: Sub j ect: Information Control Well Records LR2-1 BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. K-14 pRoD-F 11/20/89 81 9900-10250 Sch F-22 TDT-P 11/17/89 81 9250-9854 Sch 5" F-22 TEMP & PRES 11/17/89 81 9310-9834 Sch · R-6i COMPLETION 11/18/89 81 9046-10501 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS · · " STATE OF ALASKA ALASKA ~IL AND GAS CONSERVATION COMMISSION ~:~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Standard Alaska Production Company 87-95 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21752 4. Location of well at surface 9. Unit or Lease Name 1909 SNL, 4106 WEL, Sec. 4, T11N, R14E Prudhoe Bay Unit At Top Producing Interval 10. Well Number K-14(23-9-11-14) 2750' SNL, 3811' WEL, Sec. 9, T11N, R14E 11. Field and Pool At Total Depth Prudhoe Bay Field/Prudhoe Bay Pool 3356' SNL, 3852' WEL, Sec. 9, T11N, R14E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. 53.22' I ADL 28303 12. Date Spudded' 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 9-10-87 9-26-87 12-22-87I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVDI 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 11,800'MD 8991'TVD 11,756'MD 8963'TVD YES [] NO []I 1978feet MD I 1915' 22, Type Electric or Other Logs Run Submitted with 10-403 11-4-87. DIL, BHCS, LDT/CNL-poro, LDT/CNL-raw, Laserlog MWD resistivity & TVD 23. CASING, LINER AND CEMENTING R~RD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Conductor Surface 110' 8 cu yds Concrete 13-3/8" 72# L-80 Butt Surface 1909' 17-1/2" 13-3/8" 72# S-95 Butt 1909' 2720' 17-1/2" 4185 cu fi Arctic Set II 9-5/8" 47# L-80 NSCC Surface 4652' 12-1/4" 9-5/8" 4 7# L-80 Butt 4652' 10, 830' 12-1/4" 2375 cu fl Class G 7" 26# L-80 IJ4S 10,574' 11,800' 8-1/2" 414 cu ft Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET {MD) 3-1/8" HSC Densijet at 4 spf 4-1/2" 12.6# L-80 10,485' 10,501' MD TVDss 11,599'- 11,620' 8808'-8822' 5-1/2" 17# L-80 1997' 11,630'- 11,659' 8829'- 8848' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11,664' - 11,675' 8851' - 8858' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11,682'- 11,697' 8863'- 8872' 13-3/8" X 9-5/8" Downsqueeze 13-3/8" x 9-5/8" Annulus with 300 sx Arctic Set I followed by 125 bbls crude oil 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing. gas lift, etc.) 12-22-87 I FIowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description ol lithology~ porosity, lractures, apparent dips, and presence ol oil, gas or water. Submit core chips. , , ..... . ,. ;.,' ..... ~....~ .... ~ , ... ,. . Submit in duplicate Form 10-407 Rev. 7-1-80 ~INUED ON REVERSE SIDE 29. ', 30. ° GEOLOGIC MARKERS - ' r~RMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 10,868' 8364' Shublika 10,955' 8426' Zone 4 10, 982' 8445' (Top Ivishak) Sadlerochit) 31. LIST OF ATTACHMENTS 32. I hereby cedify that lhe foregoing is true and correct to the best of my knowledge Signed <~~~ T i t l e Pt~U l~ri/lin¢ En~,peerin¢ ~u.~ervisor D at e ~,/'/i/~;~'''' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 INITIAL PERFORATING DATA - Well K-14 12/20/87 Pressure tested tubing and inner annulus. 12/22/87 Installed and tested lubricator to 3500 psi. Rigged up Gearhart and perforated the following intervals for initial production using 3 1/8" HSC Densijet guns at 4 spf: 11599' - 11620' MD BKB (8808'-8822' TVDss) 11630' - 11659' MD BKB (8829'-8848' TVDss) 11664' - 11675' MD BKB (8851'-8858' TVDss) 11682' - 11697' MD BKB (8863'-8872' TVDss) Ref. BHCS/GR, 09/26/87. Put well on production. 02/01/88 Set and tested initial SSSV in ball valve nipple at 1978'. 02/02/88 Shut in well to prepare for static pressure survey. 02/04/88 Ran initial static pressure temperature survey at 8800' TVDss. jm(02/22/88) 0755Z Rig: Nabors 18E Well: K- 14 Daily Drilling Report -- PRUDHOE BAY September 11, 1987 at 0600 hrs STANDARD ALASKA PRODUCTION Current Operation: Mud Type: Spud Drilling 17-1/2" hole. 0600 Depth: 1215' Day: 1 24-Hour Ftg: 1125' Water Used: 2800 Accepted rig at 0400 hrs on 9/10/87. Drill to 1016'. Trip. Drilling at 1215'. Spud at 1330 hrs on 9/10/87. Drill to 505'. Trip. WT: 9.0 VIS: 150 PV: 15 YP: 41 FL: 16 Solids: 5 Temp: 43°F ANGLE DIRECq"ION 7¥D SECTION COORDINATES DLS STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: K-14 Daily Drilling Report -- PRUDHOE BAY September 14,' 1987 at 0600 hrs Current Operation: Mud Type: Gel SURVEY ,MD 8 1910 10 2098 12 2351 14 2573 16 2823 18 3042 2O 3230 0600 Depth: 3430' Day: 4 72-Hour Ftg: 1000' Water Used: 5400 Drilling and jetting. Drill to 2741'. Short trip. Ran 13-3/8" casing to 2717' and cemented with 4500 sks Arcticset II. NU and test wellhead and BOPE. RIH and test casing to 3000 psi. Drill to 2755' and ran FIT to .65 psi/ft. Drilling at 3430'. WT: 8.8 VIS' 35 PV: 5 YP: 6 FL: 18 Solids: 3.5 Temp: 67°F ANGLE DIRE~'TION TVD SECTION COORDINATES DLS 4.50 S28E 1909 19 S19 E.50 3.19 9.25 S23E 2096 41 S40 El3 2.90 17.3 S5.8E 2342 96 S95 El3 5.47 25.0 S7.5E 2549 175 S174 E23 3.51 32.4 S 1.9E 2768 297 S295 E37 3.36 36.5 S4.4W 2948 422 S420 E32 .96 38.4 S 1.5E 3096 537 S536 E31 .22 STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: K- 14 Daily Drilling Report -- PRUDHOE BAY September 15, 1987 at 0600 hrs Current Operation: Mud Type: Gel 21 3324 22 3482 23 3610 24 3705 25 4005 26 4447 27 4763 28 5078 29 5395 0600 Depth: 5930' Day: 5 24-Hour Ftg: 2500' Water Used: 1400 Drilling 12-1/4" hole. Drill to 3751'. Trip. Drill to 4206'. Trip for broken bit nozzle. Drilling at 5930'. WT: 9.2 VIS: 36 PV: 7 YP: 9 FL: 15.2 Solids: 6.5 Temp: 68°F ANGLE DIRECq'ION 'I'VD SECWIQN COORDINATES DLS 40 S6.5E 3169 596 S595 E36 3.82 43 S7.5E 3287 701 S700 E49 1.94 46 S8.9E 3378 791 S789 E62 2.47 48 S8.9E 3443 860 S857 E72 2.11 50 S7.9E 3637 1085 S1080 El05 0.57 49 S6.5E 3927 1431 S4413 E149 0.27 47 S4.0E 4138 1656 S1648 E168 0.78 47 S2.2E 4332 1887 S1873 El81 0.46 47 S5.4E 4568 2119 $3110 S136 0.71 STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: K- 14 Daily Drilling Report -- PRUDHOE BAY September 16, 1987 at 0600 hrs Current Operation: RIH. 0600 Depth: 7164' Day: 6 24-Hour Ftg: 1234' Water Used: 1100 Drill to 6417'. Trip. Drill to 7164'. Trip. Mud Type: Gel WT: 9.4 VIS: 58 PV: 7 YP: 11 FL: 12 Solids: 8 Temp: 78°F SUR.VI~Y ~tD ANGLE DIRECTION TVD SECTION COORDINATES DL.q 30 5864 46.5 S2.9E 4889 2462 S2452 E221 0.43 31 6342 47.0 S0.7W 5216 2889 S2800 E224 0.59 32 6814 48.3 S3.7W 5534 3155 S3148 E213 0.52 33 6939 48.3 S4.1W 5617 3247 S3241 E207 0.74 34 7065 48.4 S4.8W 5701 3340 S3335 E200 0.42 ~TANDARD . ALASKA PRODUCTION Rig: Nabors 18E Well: K- 14 Daily Drilling Report -- PRUDHOE BAY September 17, 1987 at 0600 hrs Current Operation: Drilling. 0600 Depth: 7430' Day: 7 24-Hour Ftg: 266' Water Used: 1050 Dynadrill to 7417'. Trip. Drilling at 7430'. Mud Type: Gel WT: 9.4+ VIS: 34 PV: 5 YP: 6 FL: 7.2 Solids: 8 Temp: °F SURVEY MI) ANGLE DIRECTION Wv'D SECTION COO~A~ DLS Rig: Nabors 18E Well: K-14 Daily Drilling Report -- PRUDHOE BAY September 18, 1987 at 0600 hfs AFE # 120556 STANDARD ALASKA PRODiJCTION Current Operation: 0600 Depth: 8367' Day: 8 24-Hour Ftg: 937' Water Used: 1225 Drilling. Drill to 8335'. Trip. Dyna-Drilling at 8367'. Mud Type: Gel WT: 9.5 VIS- 34 PV: 7 YP: 7 SURVEY MD ANGLE DIRECYION TVD FL: 6 Solids: 8.5 Temp: °F SECTION 35 7445 45.3 S0.9W 5961 3617 36 7759 45.8 S0.6W 6180 3840 37 7917 46.0 S0.2W 6290 3954 38 8168 45.4 S0.1E 6466 4133 C(X)RDINATES ~ S3612 E186 1.11 S3836 E183 0.17 S3950 E182 0.22 S4129 E182 0.25 STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: K- 14 Daily Drilling Report -- PRUDIlOE BAY September 21, 1987 at 0600 hfs AFE # 120556 Current Operation: Mud Type: Gel 40 8548 41 8768 42 9073 43 9361 44 7618 45 9962 46 10174 ~ Depth: 10290' Day: 11 72-Hour Ftg: 1923' Water Used: 1400 RIH with #3 Dyna-Drill. Dyna-Drill to 8501'. Trip. Drill to 9419'. Trip. Drill to 10290'. Trip for Dyna-Drill. WT: 9.7+ VIS: 36 PV: 7 YP: 7 FL: 5.8 Solids: 10.5 Temp: 78°F ANGLE DIRECTION TVD SECTION COORDINATES DLS 45.4 S7.2E 6734 4402 S4399 E192 2.12 45.4 S6.5E 6889 4559 S4555 E211 0.34 46.2 S6.8E 7101 4778 S4972 E236 0.21 45.9 S5.4E 7301 4985 S4978 E258 0.37 45.8 S5.5E 7522 5213 S5201 E303 0.08 45.2 S2.6E 7721 5415 S5407 E293 0.66 45.4 $0.5W 7870 5565 S5558 E295 1.08 Rig: Nabors 18E Well: K-14 Daily Drilling Report -- PRUDItOE BAY September 22, 1987 at 0600 hrs AFE # 120556 STANDARD ALASKA PRODUCTION Current Operation: Mud Type: Gel 47 10.2 48 10.3 Drilling. 0600 Depth: 10290' Day: 12 48-Hour Ftg: 273' Water Used: 1400 RIH with Dyna-Drill. Could not get past sidetrack hole at 7411'. Trip for BHA. RIH with locked assembly. Drilling at 10,563'. WT: 9.8 VIS' 38 PV: 8 YP: 7 FL: 5.6 Solids: 11 Temp: °F ANGLE DLRE~ON TVD SECTION COORDINATES DLS 46.1 S2.0W 7897 5593 S5586 E294 3.06 46.4 S3.4W 8006 5706 S5699 E289 0.67 Rig: Nabors 18E Well: K- 14 Daily Drilling Report -- PRUDHOE BAY September 23, 1987 at 0600 hrs AFE # 120556 STANDARD ALASKA PRODUCTION Chm'ent Operation: Mud Type: Gel 49 10530 50 10689 51 10750 TD 10835 0600 Depth: 10835' Day: 13 48-Hour Ftg: 272' Water Used: 680 RIH with 9-5/8" casing. Drill to 10835'. Short trip. CBU. POH. Running9-5/8" casing. WT: 9.9 VIS: 40 PV: 11 YP: 8 FL: 5.6 Solids: 12 Temp: °F ANGLE DIRECTION TVD SECTION C(X)RDINATES 45.8 S3.7W 8116 5820 S5813 E282 44.8 S3.7W 8228 5932 S5926 E274 44.3 S5.1W 8271 5974 S5965 E271 44.3 S5.1W 8332 6033 S6028 E266 0.40 0.63 1.61 0 Rig: Nabors 18E Well: K- 14 Daily Drilling Report -- PRUDHOE BAY September 24, 1987 at 0600 hrs AFE # 120556 STANDARD ALASKA PRODUCTION Current Operation: Mud Type: Gel 0600 Depth: 10835' Day: 14 48-Hour Ftg: Water Used: 1375 Cixculate and condition mud. Ran 9-5/8" casing to 10827' and cemented with 2375 cu. ft. Class G. Installed and tested packoff. Tested BOPE. RIH and drilled FC. Tested casing to 3000 psi. Drill to 10835'. CBU. WT: 9.8 VIS: 39 PV: 10 YP: 8 FL: 6 Solids: 11.5 Temp: °F ANGLE DIRECqlON TVD SECTION COORDINA~S DLS STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: K-14 Daily Drilling Report -- PRUDHOE BAY September 25, 1987 at 0600 hrs AFE # 120556 Current Operation: Drilling 8-1/2" hole. 0600 Depth: 11,485' Day: 15 48-Hour Ftg: 650' Water Used: 940 Drill 8-1/2" hole to 11,22'. Short trip. Drilling at 11,485'. Mud Type: Gel WT: 9.0 VIS: 40 PV: 7 YP: 8 FL: 4.4 Solids: 5 Temp: 93°F SURVEY MD ANGLE DIRECq'ION ~ SEC'rlON COORDINA~ DLS STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: K- 14 Daily Drilling Report -- PRUDHOE BAY September 28, 1987 at 0600 hrs AFE # 120556 Current Operation: 0600 Depth: 11,800' Day: 18 48-Hour Ftg: 315' Water Used: 1825 RIH with 6" bit. Drill to 11,800'. Ran open hole logs. Made wiper trip. Ran 7" liner to 11,798' and cemented with 360 sks Class G. Clean out cement from 10,435' to TOL at 10,567. Mud Type: Gel WT: 9.0 VIS' 43 PV: 8 YP: 8 FL: 4.6 Solids: 5.5 Temp: °F ANGLE DIRECTION .TVD SECWION COORDINATES DLS Rig: Nabors 18E Well: K-14 Daily Drilling Report -- September 29, 1987 AFE # 120556 PRUDHOE BAY at 0600 hrs STANDARD ALASKA PRODUCTION Current Operation: Mud Type: Gel 0600 Depth: 1 1,756' Day: 19 24-Hour Ftg: Water Used: 1205 Slip and cut drilling line. Clean out to 11756'. Displace to NaCI. WT: 9.6 VIS: PV: YP: FL: Solids: Temp: °F STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: K-14 Daily Drilling Report -- PRUDHOE BAY September 30, 1987 at 0600 hfs AFE # 120556 Current Operation: 0600 Depth: 11,756' Day: 20 24-Hour Ftg: ' Water Used: 500 Displacing robing with diesel. Ran 4-1/2" robing. NU and test tree. Displace robing with diesel Mud Type: Brine WT: 9.6 VIS: PV: YP: FL: Solids: Temp: °F STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: K- 14 Daily Drilling Report -- PRUDHOE BAY October 1, 1987 at 0600 hfs AFE # 120556 Current Operation: 06(X) Depth: 11,756' Day: 21 24-Hour Ftg: ' Water Used: Released rig. Displaced tubing with diesel. Set and tested packer. Released rig at 1000 hrs on 9/30/87. Mud Type: WT: VIS: PV: YP: FL: Solids: Temp: °F STANDARD ALASKA PRODUCTION CO. P/3,D- K (23~-9. II-14) K'I4 Controlled Drilling Consultants, Inc. LES HENDERSON 3334552 CONTi,.,,LLED DRILLING CONSULTANTS, INC. · 4234 I(~NGSTON. DR.. . Anchorage, Alaska 99504 · (907) 333-1552 October 5, 1987 Mr. Brian Rose Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, AK 99502 RE.~ Magnetic Single Shot Survey Job No. 0987-010 Well K-14 (23-9-11-14) Prudhoe Bay Field North Slope, Alaska Date of Survey: 09-10-87 to 09-22-87 Dear Mr. Rose: Please find. enclosed the "Original" and six (6) copies of our Magnetic Single Shot Survey on the.above well. The method used in calculating this survey was Radius of Curvature. The depth of the survey was 493 to 10,835. Thank you for giving, us this opportunitY to be of service. Yours very truly, Controlled Drilling Cons~l,~nts, Inc. T~rry V. Henderson Directional Supervisor STANDARD ASKA PRODUCTION COMPANY MAGNETIC SINGLE SHOT SURVEY RADIUS OF' CURVATURE METHOD OF CONPUTAT~ON COMPUTED FOR CDC ~Y O~E~NTECN WELL K-i ~ KB ELEY 52,22 FT, SURVEY DATE 09,,'i0287 PROPOSED RECORD OF SURVEY TRUE HE~$, DRIFT VERTIr.;~L, DEPT~ ANGL~ DEPTH D H SEA DRIFT DEG, TOTRL COORDINATES CLOSV f-:t~.S,,~I'~ED VERT I C~L TO OFT, 734 0 45 974 0 45 172~ 0 0 t817 1 45 19~ 0 4 30 209S 9 15 2225 1 2 0 2351 !7 2479 2t 42 2573 25 2691 29 294~ ~5 42 3642 3137 492,99 733,98 973.96 !275.94 i582,93 !722 ~816 I909 2004 2096 2220 2342 2463 2549 2654 2768 9~ 92 77 i9 14 95 81 44 73 75 !2 287i 2947,62 u~,~, 94 2969 -53.22 N 4~9,77 823 880,76 $22. 92 O. 74 925, 1222,72 $ ~529,7t S12. i669,71 S , J763,70 S 5, J856,55 S28, i 950,97 939. 2 842,92 2J67,73 8t2, 2~89,59 S 5, 24 ! O. 22 S 7, 2714,90 S 28t8,45 S 2894,40 S 4 ,72 S OOE OOE OOW OOE OOE OOE OOE OOE OOE 80E 50E 9DE 70W 50E 1.98 S 4,54 S 7,42 S J. O, 63 8 t2,92 S ~4,35 S ~9, i8 S 27,79 S 39,70 S 62.6S S 94,3S 8 t 36 , 76 S t73, "~ -8 95 S ¢.>4,25 S 364, ~ 9 S 4.~9,44 S 4 77,29 S 535, !6 S .. 9::~ ,6i 97 13 83 t6 04 19 27 24 3~ ,34 36, O! 32,~0 30.63 2 7 I0 i2 t2 t4 42 64 175 229 296 365 420 478 E E S O ~ $ SEVE:: I TY D~:C:,/i 0 OFT , . i OJ i 79 :2 96i 4i 6 47'i 44:2 3,560 3, 049 3,276 ,2!5 SOHIO WELL K-I4 SINGLE SHOT SURVEY JO8 NO A--O'~87-Otv COHPU~.~,~-. 24 .~EP 87 K8 ELFV 5''~' MEAS. DRIFT D M 37 05 48 4005 49 4447 49 4763 47 5335 47 5865 46 6342 47 6814 48 6~39 48 7065 48 7~45 45 7759 45 7917' 46 8168 45 8263 44 8548 4~ 8768 45 9873 46 9361 45 9679 45 ~962 45 0174 45 I0214 46 0371 46 6 42 0 48 24 0 18 24 t8 48 24 48 24 0 t2 54 48 24 24 TRUE VERTICAL DEPTH 3286,65 3377,78 3442,44 392.7,58 4~52,62 4568 4889,25 5534,04 5617,19 5700,~3 5960,78 6180,67 ~29 O, 6465,93 6532 6734, ~ 6 6899, i 8 71 02,57 7362,45 7523,95 7722: 3 I 7871 ,43 78~9 8007,91 SUB SEA 3389.22 4 084,98 4299,4 O 4515, i9 '548~, 82 ~5~3.97 ~647,7 ~ 5907,5S 6127,45 6237.4 ~ 6412.71 ~36E: O, 94 7 049, ~ 74~ O, 7~ ~6~9,09 ~818,2~ 7846, ~ 2 7954,69 -,~ ~.,r. r~F ~URVE~~ DRIFT DiREC TOTAL. COOEDINATES 5'3E 594,47 S ~6,29 5OE 698,58 S 49, OE 787,52 S 81,99 OB 856,27 S 72.66 OE t'O79.SJ S 105.68 6,50E 1412,6e S t47,7i OE I647.!5 $ 169,26 5,40E 2109,23 S t97, OE 2451,76 S 221 ,98 9OW 2799.87 $ 228, ~.TOW 3~47.58 S 234,05 0~ 7240.69 9 207,70 OW ~334,56 $ 200.40 O~I Sd.t!.36 S !86,62 OW ~835,49 S t83,68 20W ~.,4~¢:,9~, S ~8z.89 OE 4!28.59 S t82,73 Oki 4~95,88 S 182. 7,20E 4:~97,30 S 192,41 5OE 4552 2~ S 2t! 80E 4768,74 S 236,26 40E 4974.98 $ 258,29 OE 5202,1t S 279,I7 OE 540S,49 9 292, OW 5554, t4 S 295,35 OW 5-8~,78 S 294 70 OW 5696,06 9 289, E E E E E E E E E E E E E E E E E E E E E E E E C L 0 S D~STANCE 789,95 S 1428,30 S I655,83 $ 1886,32: S 2118,42 S 246I. 79 S 3154,85 S 3247,34 S 3340,57 S ~6t6, ~8 S 3839.89 S 7953.19 S 4J32 63 S 4~99 92 S 440i 51 S 4557 18 S 4774 58 S 4981 60 S 5209 60 S 54~ ~, 4~ S ~561,99 S ~590,56 S 3783.41 S A N G L E ,~57 240 ,663 '75S 5 ?9 4 ~ 9 430 !67 967 527 ~,<.~ 77 ! ,505 S9t5- ~--' I ¢~: >35 . 'i"'P ..... 246 0"; :?.8 07,7? .... 3~S9", 5S ..... 39S~, 7 ..... 4 i99: i~- ..... 455 ~,: 66- 4>'74 24 .... 498i , 37 ..... 541 i ~ ..... SOHIO cELL JO~ HO CONPUTER- RECORD OF ~URV~ TRUE NEA$. DRIFT VERTICAL SUB DRIFT DEPTH ANGLE DEPTH SEA OlREC D M DEG. i85~;0 45 48 8~8,~ ~'064,94 S 0689 44 48 82~9,99 8t76,77 S S'.70W ~0750 44 ~8 8~-~',~,46 6220~ ,24. S 5,iOW THE FOLIOWIN~ IS EXTRAPOLATED ".FO TD BOTTOM HOLE CLO.JRE 60.~ 88 ~.HL COORDINATES 5810.41 ~ 282.27 E ~.~,8o 8 27I~9 E FEET AT S 2 3I 54 E CLOSURES 8T~qNCE AH DOG LEG DE(~' ..... i O OFT r, ~ ~"'.-~ ~,~ ~ ~,,'.-~.- ?,., .. - ~ '$8 7' ...,~6LE SK~.~T SURVEY JOB ~,.~4'* A-0987~8t¢ SOHIO ~ELL K-14 St~ ~ ' ~ i',iEA~UREg DEPTH ANb OTHER DATA DE;PTH 0 I 1954 2156 225~ 2~62 2689 ~80S ~92~ ~304 J4J7 3575 TRUE VERTICAL SUB HD.-TV[:, DEPTN SEA DIFFERENCE 65~, 600 O 853, 80 (~ O 1353, J 300 0 J453, 1400 J557, ~500 16~:¢, 16 O 0 O i 753, ! 7 00 0 J853, I800 19SS. ~900 0 20~, 2000 2153, 2! 00 2 2253, 2200 4 2353, 2300 2453, 2400 !4 2553, 2580 23 26~, 2600 2P5~, 2700 ~2 2853, 2900 72 2953, 290O 95 3053, 3000 3t53, ~I O0 150 3353, 3300 22t 345~. 3400 2~7 CORRECT l ON 0 o 0 0 0 o o 0 0 o 0 4 6 9 ~6 20. ~? 38 4.6 TOTAL COORDINATES ,O,S S ,89 H ,42 S i.48 s 2,5~ s 3,58 $ 4,78 S 5,98 S 7,!8 S 9,4,5 S ¢0,43 S 11,26 $ ii,94 s i2,48 S t2,84 $ i3,07 $ 15,78 S 22,65 S ~3,69 S 49,27 S 97,59 S i 32.77 S i~5 31 S 226: 1 2 S 284,89 S J51,ll S 4'23,58 S 496,32 S 581,75 S 6¢8, 03 S 762,67 S 868, ! 6 S .i6 E ! ,.oi E !,07 E ,, .96 10 75 E 16 40 E ~4 8~ E !4 6~> E i~ 76 E 2~, 'J5 E ~ i '"~ '~ F 36 , 71 E :~4 S:'~ 45,i4 E 58,i0 E 74 P; '''> SOHIO ~ELL MEAS JR~D DEPTH 4486 5O79 5~5 552O 6397 6544 ~84~ 6993 7290 7434 7577 7720 7863 8007 8150 8292 8433 8575 0717 ~859 ~,. ,;.~ SURVEY JO9 AND, OTHfr.~. DATA FOF: EVER? E~,;E~4 I O0 FEET OF TRUE VERTICAL SU8 HD.....TVD VERT!C'AL D~,.TH SE~ DZFFERENCE CORRECTION 3753, 3700 426 54 3853, 3800 480 54 4053, 4000 583 5~ 4153, 4!80 ~31 48 4253, 4200 679 48 4353, 4~88 725 46 4453, 4480 772 47 455~, 4500 819 47 465~, 4600 866 47 4753, 4700 9'i3 47 4853, 4~OO 959 46 4953. 4900 I 004 45 5053, 5000 i 050 46 5!53, 51 00 I 89~ 46 5253, 5200 t~4g 47 5~53, 5300 t190 47 5453. 5400 ~239 49 5553. 5500 ~289 50 5653, 5600 1339 50 5753. 5700 !790 51 5853. 5~08 ~ 437 47 95.3 5900 ~ 481 44 ~853, 6088 i523 42 6153, 6100 ~566 43 6253. 6288 1609 43 6353. 6~00 ~653 44 6453. 6400 i696 43 6553, 6500 ~738 42 6653, 6600 ~779 4~ 6753. 6700 I82t 42 ~853, 6800 ~63 42 6953, 6900 ~985 42 SUB SE~ DEPTH, C 0 f'l P U T E R" - i<8 ELEV 'tOTAL COORDIN,qTr:C' . . ~.~,~ 98 O. 28 12i 1327,37 '~553,99 16$3,44 ~77J.30 1985.06 2 092 228 23 07,72 2413.78 2519.22 ~625.2 O 279 ~, 79 2839, O0 2947,53 3057,56 3!69.86 3281,07 3392,6~ 3500,32 37 05, t O 3~07,30 391 0,3t 4115 42!5,99 4.S~5,96 44t6,46 45i 6,5i 91, 137. ?4 161 ,9~ i76,98 1=¢ , 22?,$8 227,30 224: 15 ~i9 9i 2 204. ?0 189. ::~0 i 85, ~5 183,99 i83. 182 7:2 I :~ 2 ? i t 94, E, i 206.'.¢0 2 'i 8, ::.~ 7 SOHIO i~lELL K-!4 MEASURED DEPTH D!E~SU'RED DEPTH 9002 94~4 ~0292 07~ AND OTHER DATA FOR EVERY EVEN t00 FEET OF TRUE VERTICAL. SUB ND-TVD DEPTH SEA DIFFERENCE 'VERTICAL CORREOTiOH 7353, 7300 2080 7453, 7408 2i24 755~, 7500 21~? 7653, 7608 2210 ??53, 7700 2252 8i53, 8iOO 2426 8253, ~200 2468 8534, ~28i 2500 4.~ 44 44 44 44 42 42 44 45 42 NO A'"'t.~,¢-Oi,..~ ~..,uf4, FdTER- 24 ""*-": K8 E;LE? 57.2:'2 SUB SE~ DEPTH, TOTAL COORDIHRTES 47!?,8~ S 2S0,2S 4924,27 $ 25~,3~ 5827,88 $ 263.~9 5~33,77 S 289,04 54~4,~6 S 293,96 56~8,87 $ 292,40 5747,3~ $ 286,~0 5e46,20 $ 279-95 5946,04 S 27S.S5 .9OHIO !.~IELL K~i 4 SINGLE SHOT SURVEY ) JO9 NO CO~,IPU TER-.- KB EL~:V 4 INTERPOLATED VALUES FOR EVEN TRUE MEASURED VERT I CAL DEPTH DEPTH 0 3000 2914, 6000 4982, 7~00 5658, SOOO 6348. 9000 7052, {OOOO 7749. J0835 0334, ? 947. 4246, 4929, 6999, 8281, FEET OF MEASURED DEPTH, 'TOTAL COORDiHAT~S 7,73 s 2549,7i 9 226 4008,56 $ 47i~,54 S 230, 5430,44 S 6024,99 $ 266, O0 52 94 34, 02 77 87 i ': i HORIZONTAL VIEW', '-STANDARD ALASKA PROI~UCTION CO. WELL K? 14 (.25-9-11-1~) RADIUS IOF. CURVATURE. MAGNETIC SINGLE -SHOT SCAL~, I"= ,ooo, . · . · . . ALL DEPTHS S~OWN ' i ' ' ARE TVD ~¢ TELECO] Teleco Oilfield Se, ;s of Alaska Inc. 6116 Nielson Way -~ Anchorage,99§02 AK (907) 562-2646 September 25, 1987 JOB #587 STANDARD ALASKA PRODUCTION CO. WELL: K-14 PRUDHOE BAY UNIT RIG: NABORS 18E Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to Standard Alaska Production Company. Teleco is committed~ to providing the highest quality MWD service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, ~ Dave Reimer Field Service Supervisor DR/el Enclosures RECEIVED A ,~T~IAT COMPANY TELECO OILFIELD SERVICES JOB 587 SURVEY CALCULATONS Date Page 09/24/87 Company: S.A.P.C. Well: K-14 Location: PRUDHOE BAY Rig: NABORS 18-E TELECO Job # 587 TAK Grid Correction: Magnetic Declination: Total Correction: Proposed Direction: 0.00 degrees 30.80 degrees 30.80 degrees 176.46 degrees RADIUS OF CURVATURE CALCULATION MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION ~ N/S E/W D~ST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 ' **************************************************************************************************** TIE INTO GYRO SURVEY 2225.00 12.0 192.0 S 12 00 W 2220.96 63.99 62.87S 15.74E 64.81 S 14.056E 0.000 TELECO MWD SURVEYS 2573.00 25.0 172.5 S 07 30 E 2549.73 175.05 173.91S 23.81E 175.53 S 7.796E 3.511 2691.00 29.2 172.1 S 07 54 E 2654.76 228.65 227.17S 31.01E 229.27 S 7.774E 3.563 2823.00 32.4 178.1 S 01 54 E 2768.12 296.18 294.47S 36.78E 296.76 S 7.120E 3.358 2479.00 21.7 172.5 S 07 30 E 2463.44 137.88 136.97S 18.97E 138.28 S 7.885E 3.466 2351.00 17.3 174.2 S 05 48 E 2342.82 95.23 94.55S 14.02E 95.58 S 8.437E 5.473 TELECO Job # 587 TAK .~ 09/24/87 Page 2 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 ' **************************************************************************************************** 2948.00 35.7 183.7 S 03 42 W 2871.68 365.92 364.41S 35.68E 366.16 S 5.592E 3.639 3042.00 36.5 184.4 S 04 24 W 2947.63 420.82 419.66S 31.77E 420.86 S 4.329E 0.958 3137.00 38.6 178.5 S 01 30 E 3022.94 478.47 477.51S 30.30E 478.47 S 3.632E 4.381 3230.00 38.4 178.5 S 01 30 E 3095.72 536.33 535.38S 31.78E 536.33 S 3.398E 0.221 3324.00 40.1 173.5 S 06 30 E 3168.52 595.78 594.69S 35.93E 595.78 S 3.458E 3.819 3482.00 43.1 172.5 S 07 30 E 3286.65 700.47 698.80S 48.71E 700.49 S 3.988E 1.945 3610.00 46.1 171.1 S 08 54 E 3377.78 790.04 787.74S 61.53E 790.14 S 4.466E 2.466 3705.00 48.1 171.1 S 08 54 E 3442.45 859.33 856.50S 72.26E 859.54 S 4.823E 2.106 4005.00 49.7 172.1 S 07 54 E 3639.65 1084.58 1080.14S 105.28E 1085.26 S 5.567E 0.589 4447.00 49.0 173.5 S 06 30 E 3927.59 1419.22 1412.82S 147.31E 1420.48 S 5.953E 0.288 4763.00 47.4 176.0 S 04 00 E 4138.21 1654.66 1647.38S 168.86E 1656.01 S 5.853E 0.777 5078.00 46.8 177.8 S 02 12 E 4352.63 1885.39 1877.78S 181.34E 1886.52 S 5.516E 0.460 5395.00 47.4 174.6 S 05 24 E 4568.41 2117.57 2109.45S 196.72E 2118.61 S 5.328E 0.763 5865.00 46.5 177.1 S 02 54 E 4889.25 2460.98 2451.98S 221.58E 2461.97 S 5.164E 0.433 6342.00 47.0 180.9 S 00 54 W 5216.08 2808.01 2799.29S 227.64E 2808.53 S 4.649E 0.590 6814.00 48.3 183.7 S 03 42 W 5534.04 3154.98 3147.80S 213.64E 3155.04 S 3.883E 0.518 6939.00 48.3 184.1 S 04 06 W 5617.20 3247.52 3240.91S 207.29E 3247.53 S 3.660E 0.239 TELECO Job # 587 TAK 09/24/87 Page 3 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' **************************************************************************************************** 7065.00 48.4 184.8 S 04 48 W 5700.94 3340.76 3334.77S 199.99E 3340.77 S 3.432E 0.424 7445.00 45.3 180.9 S 00 54 W 5960.79 3616.18 3611.58S 186.20E 3616.38 S 2.952E 1.107 7759.00 45.8 180.6 S 00 36 W 6180.68 3839.70 3835.71S 183.27E 3840.08 S 2.736E 0.173 7917.00 46.0 180.2 S 00 12 W 6290.63 3952.90 3949.17S 182.48E 3953.38 S 2.646E 0.221 8168.00 45.4 179.9 S 00 06 E 6465.93 4132.19 4128.81S 182.32E 4132.83 S 2.528E 0.254 8263.00 44.8 181.3 S 01 18 W 6532.99 4199.31 4196.10S 181.61E 4200.03 S 2.478E 8548.00 45.4 172.8 S 07 12 E 6734.16 4400.99 4397.52S 8768.00 45.6 173.5 S 06 30 E 6888.37 4557.64 4553.32S 191.99E 4401.71 S 210.71E 4558.19 S 1.220 9962.00 45.2 177.4 S 02 36 E 7720.35 5413.38 5405.63S 292.53E 5413.54 S 3.098E 0.665 10174.00 45.4 180.6 S 00 36 W 7869.47 5563.91 5556.28S 295.16E 5564.12 S 3.041E 1.077 10214.00 46.1 182.0 S 02 00 W 7897.38 5592.45 5584.92S 294.51E 5592.69 S 3.019E 3.058 10371.00 46.4 183.4 S 03 24 W 8005.95 5705.19 5698.21S 289.17E 5705.54 S 2.905E 0.672 10530.00 45.8 183.7 S 03 42 W 8116.20 5818.88 5812.56S 10689.00 44.8 183.7 S 03 42 W 8228.04 5930.99 5925.34S 9679.00 45.8 174.9 S 05 06 E 7521.99 5211.55 5204.25S 278.98E 5211.73 S 3.069E 0.075 9361.00 45.9 174.6 S 05 24 E 7300.50 4983.48 4977.04S 258.10E 4983.72 S 2.969E 0.365 282.08E 5819.40 S 2.778E 0.401 274.74E 5931.70 S 9073.00 46.2 173.2 S 06 48 E 7100.62 4776.34 4770.87S 236.07E 4776.71 S 2.833E 0.209 2.650E 0.245 2.655E 0.629 2.500E 2.122 TELECO Job # 587 TAK 09/24/87 Page 4 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' **************************************************************************************************** 10750.00 44.3 185.1 S 05 06 W 8271.51 5973.38 5968.00S 271.46E 5974.17 S 2.604E 1.807 S~rvic~_s 0 0 800 800 1600 2400 B200 4000 4800 .... :~-~-z]~--;~ .... t ...... t---r'~7 ..... ~ ..... ~ ..... ] ...... T--] ..... : ...... r'-~ ...... ? ....... ~ ..... ' ..... t ...... ~ ...... ~--F-~ .... ~'" ...... , ........ ~ .... :'"? .... ' '-"i ............ : ...... i -1' ...... ~ .... ; ..... : .............. i ~ ..... ~ ......... '"'. ...... ' .......... ~" ........... [ ...... ; .............. , .......... .: ...... ] ~_i ; ...... i .... _} ..... :...: .... i : ..... :: .... !...i ..... Pe.L!...~.HOE!_.~A..¥. ....... i ...... i..7_ ..:_ .,. ....... ................... N_.A. BOR_S._....ii 8~.-__.E.'_ ............................. ....................................... JO~# .... 587. !T^K/ , · ....... 7 .... ~' ' .... ' 6400 7200 1 r': -: ..... ,;- ;""t ; ........................ 1 ...... ~- ...... ~ ......... ~ ...... 1 .... : .... ~ .... '.." '- 'I ...... : -t .... : '-~ i ~ ! ~ ? . , ·i ~ . ~ i : ~ , i i I ' ' I EAST (St:) TELECO 0 ~ ] ~ ~ a ] d Sarv ~ cas VERTICA! PROJECTION 0 2000 3000 4000 5000 6000 7OOO 8000 §000 10000 I 1000 1000 2000 3000 4000 5000 6000 VERTICAL SECTION $ UB.$ URFA CE DIRECTIONAL SURVEY ~UIDANCE F~ONTINUOUS r~"]OOL Gas Cons. Com[ni'ssJo~ .Anchorage Company STANDARD ALASKA PRODUCTION C..OMPANY Well Name K-14.(1909'.. SNL, 1174'.. .EWL,SEC, 4,TI..1N.~R1.4E.) Field/Location PRUDHOE BAY,, NgRTH SLOPE, ALASKA i i ii Job Reference No. 72482 Loaae~ BY: RATHERT Date 30-0CT-87 Computed By: KRUWELL GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR STANDARD ALASKA PRODUCTION CO. K-14 PRUDHO:~ BAY NDRTH SLOPE~ALASKA SURVEY DATE: 30-OCT-BT ENGINEER: J. RATHERT METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HgRIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH DF SOUTH 3 DEG 30 MIN EAST STANDARD ALASKA PRODUCT[ON CO. K-14 PRUDHOE BAY NORTH SLOPE,ALASKA COMPUTATION DATE: 3-NOV- 87 PAGE 1 D~TE OF SURVEY: 30-0CT-87 KELLY BUSHING ELEVATION: 53.22 FT ENGINEER: J. RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL. DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -53.22 0 0 N 0 0 E 100.00 100.00 46.78 0 8 N 16 27 E 200.00 200.00 146.78 0 6 S 28 57 E 300.00 300.00 246.78 0 9 S 17 19 E 400.00 400.00 346.78 0 13 S 13 28 W 500.00 500.00 446.78 0 19 S 29 34 W 600.00 600.00 546.78 0 29 S 31 20 W 700.00 699.99 646.77 0,32 S 35 32 W 800.00 799.99 746.77 0 37 S 36 45 W 900.00 899.98 846.76 0 41 S 31 4 W 1000.00 999.97 946.75 1100.00 1099.97 1.046,75 1200.00 1199.96 1146.74 1300.00 1299.96 1246.74 1400.00 1399.95 1346.73 1500.00 1499.95 1446.73 1600.00 1599.95 1546.73 1700~00 1699.94 1646.72. 1800.00 1799.94 1746.72 1900.00 1899.86 1~346.64 0 29 S 31 53 W 0 27 S 19 50 W 037 S 553;4 040 S 0 12 E 034 S 0 41E 027 S 6 6 W 0 15 S 24 35 W 0 16 S 25 24 W 0 54 S 4 5~ W 4 10 S 32 34 5 2000.00 1999.21 1945.99 8 26 2100.00 2097.82 2044.50 10 7 2200.00 2195.79 2142.57 13 5 2300.00 2292.50 223 9.28 16 4 2400.00 2387.86 2334.64 19 6 2500.00 2481.29 2428.07 22 39 2600.00 2572.37 2519.15 26 7 2700.00 2660.85 2607.63 28 49 2800.00 2747.77 2694.55 31 33 2900.00 2830.63 2777.41 35 21 S 42 22 E S 17 34 E S 2 53 W S 0 49 W S 6 6 E $ 7 11 E S 7 9 E S 6 33 E S 2 47 E S 1 13 W VERTICAL OOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET QEG/IO0 FEET FEET FEET DEG MIN 3000.00 2911.82 2858.60 36 8 3100.00 2992.00 2939.78 37 31 3200.00 3070.54 3017.32 38 33 3300.00 3148.26 3095.04 39 39 3400.00 3224.38 3171.16 41 12 3500.00 3298.00 3244.78 44 24 3600.00 3367.99 3314.77 46 3700.00 3436.72 3383.50 47 57 3800.00 3502.21 3448.99 49 39 3900.00 3566.81 3513.59 49 46 0.00 0.00 0.00 N 0.00 E -0.15 0.26 0.15 N 0.01 W -0.17 0.27 0.18 N 0.16 E 0.00 0.34 0.01 N 0.15 E 0.32 0.39 0.31 S 0.10 E 0.79 0.14 0.80 S 0.02 W 1.37 0.05 1.39 S 0.36 W 2.10 0.24 2.16 S 0.86 W 2.82 0.56 2.91 S 1.47 W 3.82 0.38 3.96 S 2.14 W 4.62 0.03 4.79 S 2.69 W 5.33 0.30 5.53 S 3.07 W 6.29 0.13 6.50 S 3.25 W 7.43 0.06 7.65 S 3.30 W 8.57 0.38 8.79 S 3.26 W 9.50 0.49 9.71 S 3.29 W 10.07 0.26 10.30 S 3.42 W 10.46 0.01 10.70 S 3.62 W 11.27 1.64 11.52 S 3.85 W 14.77 5.49 14.95 S 2.57 W 23.75 4.13 23.52 S 37.56 9.66 36.76 S 57.44 3.48 56.61 S 82.63 4.18 31.93 S 112.67 3.63 111.92 S 148.20 3.51 147.25 S 189.36 3.71 188.17 S 235.84 1.26 234.40 S 285.24 7.28 283.62 S 341.10 2.32 339.55 S S 3 3 W 399.13 S 0 46 W 458.56 S 2 1 Z E 520.41 S 5 9 E 583.32 S 6 33 E 648.10 S 7 0 E 715.63 S 7 4 7 5 786.89 S 8 1 E 859.30 S 8 15 E 934.61 0.00 N 0 0 E 0.15 N 3 38 W 0.24 N 41 14 E 0.15 N 87 56 0.33 S 18 25 E 0.80 S 1 30 W 1.44 S 14 31 2.33 S 21 49 W 3.26 S 26 48 W 4.50 S 28 22 W S 8 36 E 1010.67 5.49 S 29 17 W 6.32 S 29 I W 7.27 S 26 33 W 8.33 S 23 18 W 9.37 S 20 21 W 10.25 S 18 /+I W 10.86 S 18 22 W 11.30 S 18 41 W 12.15 S 18 29 W 15.17 S 9 45 W 4.50 E 23.95 S 10 50 E 14.31 E 39.44 S 21 16 E 15.30 E 58.64 S 15 7 E 13.82 E 83.09 S 9 34 E 15.75 E 113.02 S :3 0 E 20.01 E 148.60 S 7 44 E 25.19 E 189.85 S 7 37 E .) 30.82 E 236.41 S 7 29 E 35.26 E 285.80 S 7 5 E 35.76 E 341.42 S 5 0 E 1.25 397.86 S 4.91 457.55 S 1.38 519.43 S 1.97 582.22 S 1.84 646.70 S 3.98 713.87 S 0.58 784.70 S 3.64 856.62 S 1.13 931.42 S 0.30 1006.93 S 33.08 E 399.23 S 4 45 E 30.49 E 458.56 S 3 ~8 E 31.90 E 520.41 S 3 30 E 35.84 E 583.32 S 3 31 E 42.65 E 648.11 S 3 46 E 50.79 E 715.67 S 4 4 E 59.91 E 786.98 S 4 21 E 70.00 E 859.48 S 4 40 E 80.73 E 934.91 S 4 57 E 91.91 E 1011.12 S 5 12 E STANDARD ALASKA PROOUCTION CO. K-14 PRUDHOE BAY NORTH SLOPE,ALASKA COMPUTATION DAT:_: 3-NOV-87 PAGE 2 OATE OF SURVEY: 30-0CT'87 KELLY BUSHING ELEVATION: 53.22 FT ENGINEER: Jo RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED D~P'TH TRUE SU,~-SE ~ COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH OEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SDUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 4000.00 3631.33 3578.11 49 47 4100.00 3696.02 3642.80 49 36 4200,00 3760.97 3707.75 49 33 4300,00 3825.74 3772.52 49 42 4400.00 3890.58 3837.36 49 13 4500.00 3956.66 3903.44 47 51 4600.00 4024.19 3970.97 47 24 4700.00 4091.95 4038.73 47 14 4800.00 4159.87 4106.$5 47 9 4900.00 4227.56 4174.34 47 20 S 9 0 E 1086.74 S 9 20 E 1162.62 S 9 4 E 1238.28 S 9 3 2 1314.11 S 8 25 5 1389.91 S 6 29 E 1464.77 S 5 25 F 1538.46 S 5 3 E 1611.97 S 5 19 E- 1,585.34 S 5 23 E 1758.90 0.37 0.49 0.71 0.37 1.49 2.19 0.40 0.25 0.60 1.15 1092.44 S 103.58 E 1087.38 S 5 27 E 1157.72 S 115.76 E 1163.49 S 5 42 E 1232.77 S 127.96 E 1239.39 S 5 55 E 1308.01 S 139.94 E 1315.47 S 6 6 E 1383.23 S 151.70 E 1391.52 S 6 15 E 1457.62 S 161.54 E 1466.55 S $ 19 E 1531.00 S 168.98 E 1540.30 S 6 17 E ,) 1604.23 S 175.70 E 1613.83 S 6 15 E 1677.34 S 182.28 E 1687.21 S 6 12 E 1750.61 S 189.24 E 1760.81 S 6 10 E 5000.00 4295.94 4242.72 46 38 5100.00 4364.68 4311.46 46 38 5200.00 4433.06 4379.84 46 53 5300.00 4501.30 4448.08 47 1 5400.00 4569.46 4516.24 47 5 5500.00 4637.41 4584.19 47 5 5600.00 4705.80 4652.58 46 48 5700..00 4774.40 4721.18 46 37 5800.00 4843.25 4790.03 46 19 5900.00 4912.32 4859.10 46 15 S 4 27 E 1831.84 S 4 26 E 1904.46 S 4 36 E 1977.,41 S 4 27 E 2050.50 S 4 37 E 2123.66 S 4 37 E 2197.01 S 4 39 E 2269.96 S 4 9 E 2342.71 S 3 4 E 2415.23 S 2 40 E 2487.53 0.50 0.73 0.38 0.40 0.44 0.60 0.21 0.63 0.69 0.35 1823.30 S 195.52 E 1833.75 S 6 7 E 1895.72 S 201.12 E 1906.36 S 6 3 E 1958.46 S 206.88 E 1979.30 S 5 59 E 2041.32 S 212.67 E 2052.37 S 5 56 E 2114.27 S 218.49 E 2125.53 S 5 53 E 2187.39 S 224.43 E 2198.88 S 5 51 E 2260.11 S 230,35 E 2271.82 S 5 49 E 2332.66 S 235.96 E 2344.56 S 5 46 E 2405.03 S 240.59 E 2417.03 S 5 42 E 2477.25 S 244.14 E 2489.25 S 5 37 E 6000.00 4981.34 4928.12 46 31 6100.00 5050.02 4 ~)96. ~0 46 44 6200.00 5118.60 5065.38 46 37 6300.00 5187.10 5133.88 46 51 6400.00 5255.66 5202.44 46 46 6500.00 5333.90 5270.67 47 3 6600.00 5392.15 5338.93 46 52 6700.00 5460.50 5407.28 47 7 6800.00 5527.95 5474.73 48 6900.00 5594.67 5541.45 48 I S 2 16 E 2559.~39 S I 25 E 2632.54 S 0 18 W 2705.22 S I 11 W 2777.86 S I 41 W 2850.39 S 2 13 W 2923.16 S 3 I W 2995.82 S 3 38 W 3068.29 S 4 1 W 3141.51 S 4 B W 3215.35 0.60 0.85 0.94 0.42 1.03 0.56 0.70 0.85 0.79 0.62 2549.55 S 247.32 E 2561.51 S 5' 32 E 2622.19 S 249.68 E 2634.05 S 5 26 E 2694.95 S 250.48 E 2706.57 S 5 18 E 2767.80 S 249.40 E 2779.01 S 5 8 E 2840.57 S 247.51 E 2851.34 S 4 58 E 2913.63 S 245.00 E 2923.92 S 4 48 E 2986.64 S 241.65 E 2996.40 S 4 37 E 3059.51 S 237.34 E 3068.70 S 4 26 E 3133.17 S 232.36 E 3141.77 S 4 14 E 3207.47 S 227.05 E 3215.50 S 4 2 E 7000.00 5661.52 5508.30 48 11 7100.00 5728.18 5674.96 48 8 7200.00 5796.16 5742.94 45 37 7300.00 5866.59 5813.37 45 13 7400.00 5937.07 5~83.85 45 10 7500.00 6007.47 5954.25 45 23 7600.00 6077.62 6024.40 45 37 7700.00 6147.49 6094.27 45 43 7800.00 6217.12 6163.90 46 3 7900.00 6286.44 6233.22 46 6 S 4 18 W 3289.04 S 4 20 W 3362.37 S 2 13 W 3435.62 S I 1 W 3506.35 S 0 56 W 3577.07 S 0 52 W 3647.88 S 0 3'9 W 3718.95 S 0 29 W 3790.31 S 0 14 W 3861.91 S 0 3 W 3933.85 0.25 0.29 3.53 0.25 0.25 0.75 0.75 0.14 0.39 0.37 3281.63 S 221.58 E 3289.11 S 3 51 E 3355.95 S 215.88 E 3362.89 S 3 40 E 3429.12 S 211.18 E 3435.6Z S 3 31 E  500.08 S 209.54 E 3506.35 S 3 25 E 571.01 S 208.35 E 3577.09 S 3 20 E 3642.02 S 207.20 5 3647.91 S 3 15 E 3713.28 S 206.24 E 3719.01 S 3 10 E 3784.82 S 205.53 E 3790.40 S 3 6 E 3856.59 S 205.02 E 3862.03 S 3 2 E 3928.67 S 204.87 E 3934.'01 S 2 59 E STANDARD ALASKA PRODUCTION CO. K-14 PRUDHOE BAY NORTH SLOPE,ALASKA COMPUTATION DATE: 3-NOV-87 PAGE DATE OF SURVEY: 30-0CT-87 KELLY BUSHING ELEVATION: 53.22 FT ENGINEER: J. RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUS-SE& COURSE VERTICAL 90GLEG RECTANGULAR COORDINATES HORIZ. DEPARTUR6 MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERI'TY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN 8000.00 6355.84 6302.62 45 55 8100.00 6425.56 6372.34 45 36 8200.00 6495.79 6442.57 45 10 8300.00 6566.56 6513.34 44 42 8400.00 6637.96 6584.74 44 18 8500.00 6709.30 6656.08 44 55 8600.00 6779.48 6726.26 45 43 8700.00 6849.11 6795.89 45 51 8800.00 6918.77 6865.55 45 55 8900.00 6988.24 6935.02 46 0 9000.00 7057.75 7004.53 46 2 9100.00 7126.97 7073.75 46 14 9200.00 7196.04 7142.82 46 22 9300.00 7265.14 7211.92 46 1 9400.00 7334.77 7281.54 45 42 9500.00 7404.65 7351.43 45 40 9600.00 7474.42 7421.20 45 47 9700~00 7544.04 7490.82 45 56 9800.00 7613.67 7560.45 45 43 9900.00 7683.63 7630.41 45 26 10000.00 7754.00 7700.78 45 7 10100.00 7824.60 7771.38 45 8 10200.00 7894.75 7841.54 45 44 10300.00 7964.27 7911.04 46 21 10400.00 8033.35 7980.13 46 4 10500.00 8102.68 8049.46 45 47 10600.00 8172.75 8119.53 45 27 10700.00 8243.44 8190.22 44 35 10800.00 8315.15 8261.93 43 53 10900.00 8386.79 8333.57 44 48 11000.00 8457.10 8403.88 45 42 11100.00 8526.63 8473.41 46 17 11200.00 8594.95 8541.73 47 23 11300.00 8662.14 8608.92 48 2 11400.00 8728.88 8675.66 48 15 11500.00 8795.21 8741.99 48 36 11600.00 8861.13 8807.91 48 59 11700.00 8926.36 8873.14 49 44 11800.00 8990.98 8937.76 49 44 DEG MIN FEET OEG/IO0 FEET FEET FEET OEG MIN S 0 1 E 400 5.71 S 0 3 W 407 7. Z6 S 0 8 W 4148.31 S 0 8 W 4218.81 S 3 45 E 4288.76 S 7 17 E 4358.75 S 7 50 E 4429.'80 S 7 45 E 4501.36 S 7 31 E 4572.92 S 7 22 E 4644.69 S 7 7 E 4716.44 S 6 50 E 4788.47 S 6 32 E 4860.67 S 6 6 E 4932.85 S 5 51 E 5004.58 S 5 39 E 5076.04 S 5 18 E 5147.64 S 4 48 E 5219.41 S 4 3 E 5291.16 S 3 15 E 5362.61 S 2 34 E 5433.65 S I 2 E 5504.45 S 0 45 W 5575.59 S 2 12 W 5647.19 S 2 41 W 5719.10 S 3 B W 5790.70 S 3 53 W 5861.53 S 4 14 W 5931.68 S 4 57 W 6000.67 S 5 17 W 6069.64 S 5 11 W 6139.92 S 4 42 W 6210.99 S 3 59 W 6283.34 S 3 43 W 6356.79 S 3 24 W 6430.69 S 3 16 W 6504.99 S 3 22 W 6579.66 S 3 59 W 6654.~9 S 4 0 W 6730.55 0.45 0.66 0.50 1.06 3.61 1.45 0.51 0 0.28 0.25 0.37 0.38 0.49 0.44 0.36 0.34 0.33 0.49 0.72 0.64 0.71 1.37 2.05 0.63 6.07 3.13 1.57 1.06 0.61 1.34 0.50 1.17 0.79 0.63 0.58 0.29 0.69 5.80 0.00 4000.67 S 204.88 E 4005.91 S 2 55 E 4072.35 $ 204.87 E 4077.50 S 2 52 E 4143.54 S 204.75 E 4148.60 S 2 49 E 4214.19 S 204.41 E 4219.15 S 2 46 E 4284.17 S 206.13 E 4289.12 S 2 45 E 4353.84 S 213.45 E 4359.07 S 2 48 E ~ 4424.45 S 222.90 E 4430.06 S 2 53 [ 4495.54 S 232.71 E 4501.56 S 2 57 E 4566.65 S 242.21 E 4573.07 S 3 2 E 4637.98 S 251.56 E 4644.80 S 3 6 E 4709.32 S 260.61 E 4716.52 S 3 I0 E 4780.94 S 269.44 E 4788.52 S 3 13 E 4852.76 S 277.84 E 4860.70 S 3 16 E 4924.59 S 285.81 E 4932.88 S 3 19 E 4995.99 S 293.29 E 5004.59 S 3 21 E 5067.15 S 300.49 E 5076.05 S 3 23 E 5138.46 S 307.34 E 5147.65 S 3 25 E 5209.98 S 313.69 E 5219.41 S 3 26 E 5281.52 S 319.26 E 5'291.16 S 3 27 E 5352.83 S 323.80 E 5362.61 S 3 27 E 5423.78 S 327.46 E 5433.66 S 3 27 E 5494.56 S 329.83 E 5504.45 S 3 26 E 5565.82 S 330.03 E 5575.60 S 3 23 E 5637.69 S 327.92 E 5647.22 S 3 19 E 5709.93 S 324.82 E 5719.16 S 3 15 E 5781.88 S 321.16 E 5790.79 S 3 lO E 5853.10 S 316.95 E 5861.67 S 3 5 E 5923.67 S 312.13 E 5931.89 S 3 0 E 5993.14 S 306.55 E 6000.97 S 2 55 E 6062.62 S 300.23 E 6070.05 S 2 50 E 6133.43 S 293.71 E 6140.46 S 2 44 E 6205.02 S 287.45 E 6211.67 S 2 39 f 6277.84 S 281.95 E 6284.17 S 2 34 E 6351.73 S 276.96 E 6357.76 S 2 29 E 6426.05 S 272.33 E 6431.82 S 2 25 E 6500.76 S 267.98 E 6506.28 S 2 21 E 6575.83 S 263.64 E 6581.12 S 2 17 E 6651.49 S 258.91 E 6656.53 S 2 13 E 6727.62 S 253.59 E 6732.40 S 2 9 E COMPUTATION DATE: 3-NOV-87 PAGE 4. STANDARD ALASKA PRODUCTION CO. K-14 PRUDHOE BAY NORTH SLOPE,ALASKA DATE OF SURVEY: 30-OCT-8? KELLY BUSHING ELEVATION: 53.22 FT ENGINEER: J. R~THERT INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASUREO OEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -53.22 0 0 1000.00 999.97 946.75 0 29 2000.00 1999.21 1945.99 8 26 3000.00 2911.82 2858.60 36 8 4000.00 3631.33 3578.11 49 47 5000.00 4295.94 4242.72 46 38 6000'00 49,~1.34 4928.12 46 31 7000.00 5661.52 5608.30 48 '11 8000.00 6355.84 6302.62 45 55 9000.00 7057.75 7004.53 46 2 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIHUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 10000.00 7754.00 7700.78 45 7 11000.00 8457.10 8403.88 45 42 11800.00 8990.98 8937.76 49 44 N 0 0 ~ 0.00 S 31 53 W 4.62 S 42 22 E 23.75 S 3 3 W 399.13 S 9 '0 E 1086.74 S 4 27 E 1831.84 S 2 16 E 2559.B9 S 4 18 W 3289.04 S 0 1 E 4005.71 S 7 7 E 4716.44 S 2 34 E 5433.65 S 5 11 W 6139.92 S 4 0 W 6730.55 0.00 0.03 4.18 1.25 0.37 0.50 0.60 0.25 0.45 0.37 0.00 N 0.00 E 0.00 N 0 0 E 4.79 S 2.69 W 5.49 S 29 17 W 23.5;? S 4.50 E 23.95 S 10 50 E 397.86 S 33.08 E 399.23 S 4 45 E 1082.44 S 103.58 E 1087.38 S 5 27 E 1823.30 S 195.5Z E 1833.75 S 6 7 E 2549.55 S 247.32 E 2561.51 S 5. 32 E 3281.63 S 221.58 E 3289.11 S 3 51 E 4000.67 S 204.88 E 4005.91 $ 2 55 E 4709.32 S 260.61 E 4716.52 S 3 :LO E' 0.71 0.50 0.00 5423.78 $ 327.46 E 5433.66 S 3 27 E 6133.43 S 293.71 E 6140.46 S 2 44 E 6727.62 S 253.59 E 6732.40 S 2 9 E CDMPUTATIgN DATE: 3-NOV-B7 PAGE 5 STANDARD ALASKA PRODUCTION CO. K-14 PRUOHOE BAY NORTH SLOPEtALASKA DATE OF SURVEY: 30-0CT-87 KELLY BUSHING ELEVATION: 53.22 FT ENGINEER: J. RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH OEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -53.22 0 0 N 0 0 E 53.22 53.22 0.00 0 8 N 9 34 W 153.22 153.22 100.00 0 7 N 87 28 E 253.22 253.22 200.00 0 5 S 21 3 W 353.22 353.22 300.00 0 11 S 16 17 W 453.22 453.22 400.00 0 18 S 14 37 W 553.22 553.22 500.00 0 22 S 27 27 W 653.23 653.22 600.00 0 32 S 33 20 W 753.23 753.22 700.00 0 32 S 40 8 W 853.24 853.22 800.00 0 43 S 31 58 W 953.24 953.22 900.00 1053.25 1053.22 1000.00 1153.25 1153.22 1100.00 1253.26 1253.22 1200.00 1353.27 1353.22 1300.00 1453.27 1453.22 1400.00 1553.27 1553.22 1500.00 1653..28 1653.22 1600.00 1753.28 1753.22 1700.00 1853.29 1853.22 1800.00 0 33 S 34 31 W 0 28 S 25 22 W 0 35 S 10 11 W 039 S 1 51W 039 S 2 13 E 0 32 S 0 43 W 0 20 S 13 10 W 0 16 S 27 32 W 0 28 S 17 37 W 2 I S 17 18 E 1953.61 1953.22 1900.00 6 32 2054.72 2053.22 2000.00 9 48 2156.41 2153.22 2100.00 11 41 2259.22 2253.22 2200.00 15 1 2363.47 2353.22 2300.00 17 2469.69 2453.22 2400.00 21 32 2578.74 2553.22 2500.00 25 21 2691.29 2653.22 2600.00 28 43 2806.45 2753.22 2700.00 31 56 2927.73 2853.22 2300.00 35 33 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FSET DEG/IO0 FEET FEET FEET OEG MIN 3051.44 2953.22 2900.00 36 32 3177.88 3053.22 3000.00 38 27 3306.45 3153.22 3100.00 39 45 3438.55 3253.22 3200.00 42 7 357B.73 3353.22 3300.00 45 57 3724.84 3453.22 3400.00 48 44 3878.95 3553.22 3500.00 49 46 4033.90 3653.22 3600.00 49 43 4188.07 3753.22 3700.00 49 30 4342.49 3853.22 3800.00 49 40 0.00 0.00 0.00 N 0.00 E -0.04 0.14 0.04 N 0.01 W -0.22 0.29 0.23 N O.OB E -0.08 0.14 0.09 N 0.15 E 0.18 0.27 0.17 S 0.16 E 0.58 0.24 0.57 S 0.07 E 1.05 0.37 1.07 S 0.17 W 1.75 0.14 1.80 S 0.61 W 2.48 0.16 2.56 S 1.17 W 3..34 0.05 3.46 S 1.83 W 4.]28 0.38 4.43 S 2.46 W 5.00 0.17 5.19 S 2.92 W 5.80 0.11 6.00 S 3.18 W 6.89 0.07 7.11 S 3.29 W 8.05 0.06 8.27 S 3.29 W 9.07 0.05 9.29 S 3.27 W 9.84 0.09 10.06 S 3.35 W 10.26 0.68 10.49 S 3.53 W 10.75 0.63 11.00 S 3.74 W 12.54 3.25 12.79 S 3.65 .W S 39 53 m 18.99 S 40 I ~ 30.63 S 0 3~ E 48.12 S 3 35 W 71.75 S 4 44 E 101.10 S 7 3 5 136.79 S 7 11 : 1BO. 16 S 6 40 ~ 231.65 S 2 26 E 288.69 S 2 14 W 357.12 0.00 N 0 0 E 0.04 N 9 7 N 0.24 N 18 32 E 0.17 N 58 30 E 0.23 S 43 ~+4 E' 0.58 S 7 25 E >~ 1.08 S 9 18 W 1.90 S 18 53 W 2.81 S 24 38 W 3.91 S 27 55 W S 2 39 W 429.48 S 1 53 5 506.65 S 5 18 E 587.45 S 6 54 E 673.65 S 7 36 E 771.62 S 8 3 E 877.81 S 8 31 E 994.65 S 9 9 : 1112.51 S 9 5 E 1229.25 S 8 57 E 1346.36 5.07 S 29 2 W 5.95 S 29 20 W 6.79 S 27 53 W 7.83 S 24 50 W B.90 S 21 40 W 9.85 S 19 22 W 10.60 S 18 23 W 11.07 S 1.8 36 W 11.61 S 18 46 W 13.30 S 15 56 W 3.84 19.00 S 3.30 30.05 S 4.39 47.26 S 2.93 71.01 S 3.59 100.39 S 3.85 135.91 S 3.49 179.02 S 1.33 230.23 S 6.87 287.07 S 2.17 355.63 S 0.51 E 19.00 S 1 31 E 10.43 E 31.81 S 19 8 E 15.54 E 49.75 S 18 11 E 14.35 E 72.45 S 11 25 E 14.61 E 101.45 S 8 16 E 18.59 E 137.18 S 7 47 E 24.04 E 180.63 S 7 38 E ; 30.34 E 232.22 S 7 30 E 35.38 E 289.24 S 7 1 E 35.27 E 357.3B S 5 39 E 1.18 0.74 1.92 3.09 0.89 2.73 0.53 0.66 0.67 0.67 428.35 S 31.54 E 429.51 S 4 12 E 505.67 S 31.43 E 506.65 S 3 33 E 586.33 S 36.23 E 587.45 S 3 32 E 672.11 S 45.64 E 673.66 S 3 53 E 769.53 S 57.86 E 771.70 S 4 17 E 875.01 S 72.59 E 878.02 S 4 44 E 991.03 S 89.50 E 995.07 S 5 9 E 1108.00 S 107.66 E 1113.22 S 5 32 E 1223.80 S 126.53 E 1230.33 S 5 54 E 1340.01 S 145.03 E 1347.83 S 6 10 E STANDARD ALASKA PRODUCT[ON CO. K-14 PRUDHOE BAY NORTH SLOPEsALASKA COMPUTATIDN DATE: 3-NOV- 87 PAGE 6 DATE OF SURVEY: 30-0CT-87 KELLY BUSHING ELEVATION:' 53.22 FT ENGINEER: J. RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMU'TH DEPTH DEPTH DEPTH DEG MIN DEG MIN 4494.86 3953.22 3900.00 47 56 4642.89 4053.22 4000.00 47 22 4790.24 4153.22 4100.00 47 8 4937.69 4253.22 4200.00 46 54 5083.33 4353.22 4300.00 46 34 5229.48 4453.22 4400.00 46 54 5376.18 4553.22 4500.00 47 2 5523.19 4653.22 4600.00 46 56 5669.19 4753.22 4700.00 46 35 5814.44 4853.22 4800.00 46 21 5959.18 4953.22 4900.00 46 21 6104.68 5053.22 5000.00 46 44 6250.47 5153.22 5100.00 46 46 6396.45 5253.22 5200.00 46 45 6543.03 5353.22 5300.00 46 58 6689°32 5453.22 5400.00 47 2 6837.88 5553.22 5500.00 48 10 6987.55 5653.22 5600.00 48 10 7137.50 5753.22 5700.00 47 40 7281.03 5853.22 5800.00 45 14 7422.91 5953.22 5900.00 45 11 7565.13 6053.22 6000.00 45 28 7708.20 6153.22 6100.00 45 43 7852.04 6253.22 6200.00 46 8 7996.24 6353.22 6300.00 45 56 8139.46 6453.23 6400.00 45 26 8281.21 6553.22 6500.00 44 48 8421.33 6653.22 6600.00 44 20 8562.44 6753.22 6700.00 45 ~Z 8705.90 6853.22 6:300. O0 45 51 8849.56 6953.22 6900.00 46 0 8993.48 7053.22 7000.00 46 1 9137.97 7153.22 7100.00 46 18 9282.85 7253.22 7200.00 46 5 9426.41 7353.22 7300.00 45 39 9569.59 7453.22 7400.00 45 47 9713.21 7553.22 7500.00 45 55 9856.58 7653.22 7600.00 45 36 9998.89 7753.22 7700.00 45 7 10140.59 7853.22 7800.00 45 18 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN S 6 35 E 1460.96 S 5 16 E 1570.02 S 5 lB E 1678.20 S 5 4 E 1786.50 S 4 26 E 1892.36 S 4 36 E 1'998.91 S 4 37 E 2106.24 S 4 38 E 2213.98 S 4 17 E 2320.35 S 2 56 E 2425.68 2.28 0.23 0.49 1,39 0,64 0.50 0.14 0.77 0.69 0.66 1453.83 S 161.09 E 1462.73 S 6 19 E 1562.44 S 171.91 E 1571.87 S 6 16 E 1670.22 S 181.61 E 1680..07 S & 12 E 1778.11 S 191.79 E 1788.42 S 6 9 E 1883.65 S 200.18 E 1894.26 S 6 3 E 1989.89 S 208.61 E 2000.80 S 5 59 E ~ 2096.89 S 217.07 E 2108.10 S 5 54 E 2204.30 S 225.80 E 2215.84 S 5 50 E 2310.35 S 234.31 E 2322.20 S 5 47 E 2415.46 S 241.15 E 2427.47 S 5 42 E S 2 30 E 2530.30 S 1 22 E 2635.95 S 0 53 W 2741.85 S 1 40 W 2847.81 S 2 34 W 2954.48 S 3 35 W 3060.54 S 4 4 W 3169.48 S 4 17 W 3279.84 S 4 3 W 3390.53 S 1 5 W 3492.93 0.64 0.93 0.68 0.96 0.54 0.87 0.24 2.80 0.52 2519.98 S 246.09 E 2531.97 S 5 34 E 2625.60 S 249.77 E 2637.45 S ~c 26 E 2731.68 S 250.06 E 2743.10 S 5 13 E 2837.99 S 247.58 E 2848.77 S 4 59 E 2945.10 S 243.65 E 2955.16 S 4 43 E 3051.71 S 237.84 E 3060.96 S 4 27 E 3161.32 S 230.36 E 3169.70 S 4 10 E 3272.38 S 222.27 E 3279.92 S 3 53 E 3383.79 S 213.78 E 3390.54 S 3 36 E 3486.62 S 209.77 E 3492.93 S 3 26 E S 0 56 W 3593.27 S 0 43 W 3694.11 S 0 29 W 3796.16 S 0 7 W 3899.33 S 0 I E 4003.02 S 0 5 W 4105.35 S 0 18 W 4205.61 S 4 51 E 4303.65 S 7 42 E 4403.03 S 7 43 E 4505.58 0.27 0.70 0.15 0.28 0.50 0.35 0.61 3.67 0.61 0.27 3587.26 S 208.09 E 3593.29 S 3 19 E 3688.38 S 206.54 E 3694.16 S 3 12 E 3790.69 S 205.48 E 3796.25 S 3 6 E 3894.08 S 204.92 E 3899.47 S 3 0 5 3997.97 S 204.88 E 4003.21 S Z 56 E 4100.50 S 204.83 E 4105.61 S 2 51 E 4200.96 S 204.48 E 4205.93 S 2 47 E 4299.02 S 207.22 E 4304.01 S Z 45 E 4397.84 S 219.26 E 4403.31 S 2 51 E 4499.73 S 233.28 E 4505.78 S 2 58 E S 7 28 E 4608.47 S 7 7 E 4711.76 S 6 41 E 4815.85 S 6 9 E 4920.54 S 5 48 E 5023.46 S 5 25 E 5125.86 S 4 43 5 5228.90 S 3 35 E 5331.63 S 2 35 5 5432.87 S 0 17 E 5533.20 0.18 0.34 0.34 0.79 0.38 0 0.61 0.67 0.71 1.45 4601.98 S 246.86 E 4608.60 S 3 4 E 4704.66 S 260.03 E 4711.84 S 3 9 E 4808.18 S 272.66 E 4815.90 S 3 14 E 4912.33 S 284.50 E 4920.56 S 3 18 E 5014.79 S 295.21 E 5023.47 S 3 22 E 5116.76 S 305.30 E 5125.86 S 3 24 E 5219.44 S 314.49 E 5228.90 S 3 26 E 5321.90 S 321.96 E 5331.63 S 3 27 E 5422.99 S 327.42 E 5432.87 S 3 27 E 5523.35 S 330.18 E 5533.21 S 3 25 E STANDARD ALASKA PRODUCTION C0. K-14 PRUDHOE BAY NORTH SLOPE,ALASK~ COMPUTATION O~TE: 3-NOV-87 PAGE 7 DATE OF SURVEY: 30-OCT-87 KELLY BUSHING ELEVATION: 53.22 FI' ENGINEER: J. RATHERT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUS-SEA DEPTH TRUE SUB-SE~ COURSE VERTICAL 00GLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DISTo AZIMUTH DEPTH DEPTH DEPTH DEG M'[N 10284.01 7953.2.2 7900.00 46 15 10428.65 8053.22 8000.00 46 0 10572.12 8153.212 '8100.00 45 41 10713.74 8253.22 8200.00 44 28 10852°93 8353.22 8300.00 44 13 10994.44 8453.22 8400.00 45 41 11138.63 8553.22 8500.00 46 46 11286.67 8653.22 8600.00 47 59 11436.63 8753.22 8700.00 48 23 11587.95 8853.22 8~00.00 48 55 11741.57 8953.22 8900.90 49 44 11800.00 8990.98 8937.76 49 44 CEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN S 2 5 W 5635.68 S 2 48 W 5739.50 S 3 27 W 5341.80 S 4 20 W 5941.24 S 5 13 W 603'7.03 S 5 12 W 6135.99 S 4 24 W 6238.74 S 3 45 W 6346.96 S 3 22 W 6457.86 S 3 20 W 6570.65 S 4 0 W 6686.34 S 4 0 W 6730.55 O.B4 1.1Z 1.05 I .08 0.97 0.51 1.53 0.67 0.32 0.62 0.00 0.00 5626.13 S 328.35 E 5635.70 S 3 20 E 5730.52 S 323.81 E 5739.67 S 3 14 E 5833.25 5 318.27 E 5841.93 S 3 7 E 5933.29 S 311.40 E 5941.46 S 3 0 E 6029.76 S 303.27 E 6037.38 S 2 52 E 6129.47 S 294.07 E 6136.5'2 S 2 44 E 6232.95' S 235.22 E 6239.47 S 2 37 E 6341.84 S 277.6L E 6347.91 S 2 30 E 6453.37 S 2'70.72 E 6459.05 S 2 24 E 6566.77 S 264.17 E 6572.08 S 2 18 E 6683.14 S 256.70 E 6688.06 S 2 11 E 67?.7.62 S 253.59 E 6732.40 S 2 9 E SCHLUMBEROER O I RECT I ONAL SURVEY COMPANY STANDARD ALASKA PRODUCTION WELL K- 1 4 FIELD PRUOHOE BAY COUNTRY USA RUN 1 DATE LOOOED SO - OCT - 87 REFERENCE ?2482 WELL' K- 14 ~ (1909' SNL, 1174' EWL, ,C 4, TllN, R14E) -,~,,HORIZONTAL PROJECTION N0eTH 6000 REF 72482 SCALE : 1/2000 IN/FT 4000 2000 -2001 -4000 -6000 · -8000 i~i[ ~i! fi~ ~::: ::: :::~i~;;: ~ "~'"~'".-'~'"1'"~*"?'"~'-~ ...... ~'"?'"~"'~'"T"'~"'~'"~'"~ ....... ~'"~'"?'"~'",'"~'"?'"?'"? ....... ?'-?'"?'"?'"~"'?'"~'-4'"4 .... "T"?T"?"t'T'~'"~"'T'?"~'"i"i'"?'-'i'--! ....... f'ff-i-'-r"~-'-t-i"-fi ...... +"?'f'ff'"~'"f"f'ff"'t""'t'+'ff"-f'+'-f'i--'f'i ...... i-'-fff'--t-T"t'-i'-'f-+ ....... ~..+.+..?t..+.-~-.+..~ ....... ~..+.+.+..t...~..+..~...~ .... "'?'"?"'~'"? ...... ??"'?"'?"?"+"~ ...... ~'"i'"+'"~ ...... ~'{'"+'"i'"I'"+'"+"-~'"~ ....... ~'"+'"i'"~ ..... i---+.-.+.--~.--i-.-~...l...~...~...L..~..-~...~...~ ...... ~.--~,.-;.--~...'...~....~...~...4-.~...4...4...;...;...i...4...;-.4-4 ~-'-~-'!---~-'-!--!"'i-'-~-'""'~-'-i--~--'i'-'t--'!---i---~-'-i ....... H'-t-i-v-~,i--'!-i ....... i-'-~'-'~-'-!---!"-~---~-'-~---~ ....... .-i...i...L.i ...... L.~..L,...i...LL.i...i!ii.i ..... .i..L.i..i .i. LI~ i L~ ~ I: ~ ~ ~ ::;~ ::=,~-?'--~----?---?--~'"~ ...... ?...?-?-..t...I..?~...~.,.? ...... ~...?...~...?...-.?...?...?? ...... ?..?...?...?...~...?~...?..? ....... .......... ~...,..~..., ..... ,...~...,..., ....... ~...~...~..., ....... ~...~..,...~... ,-+-.-+-.-~--+ ....... +...~-.-~--,,-.i.--~4-.-;---i---~---i.--i--4 ....... ~-..~.--~--4--.*---~..4..,;.-4 ...... i---i--.~..4---l-.-~-.-~---~,.-; ....... ;..4...~.-.~ ....... ~...~...;-..; ....... ;..4-.;.-~.-.i.--[-.i..-i....i ...... l...i...i...i.-l...~...i...~...~ ....... · -~..+-+.-+ ..... ~---~--+.- -+-.+-!.4--!-i--.!-.-i--.~ ....... i--~.--~-.4-..i-.-~-.--i.--~--.~ ...... ~-4--.~4-.-i..-~...~-i...~-.---4---~..-i--.~--.I--.~.--;--~.-.i ....... ~-..~..-~..-~-.-I...~.4--.4 .......... r.~...~..T..~..T.T..~...i...i.~...~...t.~...i.~.t.~f.~...f.i...f.~...f~.f..f..t..f..f..~ ....... f--f--f--f-T-ff"-f.ff-'ff ...... i.-ff..ff-ff--.!--.f-.i-.-f..-~ ...... f-'f--f-'f--?.'.i...f..f.i ....... t.-t.'f'.i ....... t..f.+-i ...... t.ff...i...i ...... i...?+..f-- , , ~ : ~ ................ t ........ ~ ........ ~ ........ t-.?..? ? ~ .? ? ? ~...-..?..?..?? ...... ?.?-I...?..?-,.-- --~...~.-.+.-.~ ..... ~.-.~---~.-..-~--~---~..-~.-.+--.~--.~---~---.~ ...... ~--~-~--~-.~i.~- ' i .... , t ~t*'~'? ..... ~"~"~'"~ ....... ?~'"~'"~ ...... ~'"????.-?..??.~.-. ,,, ~I"'~'"~'"~'" ?~'"? ...... ?'?'?"~'"d'"?'?"?'? ....... r'?'~-i-'~--~--?'-? ....... ~'"?'?i'-~-'~--.'~ ...... ~'--'~"-~'--i--'~--.'.'~ ...... ~--~".-~-""~'--.-.~ ...... ~..-~...,-..,...1...,..-,.-~--.~... ...?...T..?...?...?.~?...?...?.....?...?...?...?...~...T..?...?..?`...?...?...?...?...??...?..??~...?."?...?...?.~t..~-?...?~.?...?..?~.r..i...~...{.~.+..~...~ ....... {'"!'"{'"{"-."'i"-i'-~--{ ....... ~...i...~.-~ ....... i...~-..~...~ ....... ~.,.~...~...~.,.{...~...~.-~...~ ~.t..t~?.~-t..t..t.+...+.+.+.+..f.+.+..{...~...;...~...~...i...+...~...~".~...{...{...i..+.+.+.+.+..~...i..`~...i ....... · "?.'?'M'"?t'i'"'i"i"-i'":-ti"i-'!'"i ....... H"i"i"!"i"i"i-i"'~"i"i"i"i"i"i"i"i"i ....... H'-?'i"i'-i"i"i""i ....... t'i"i'-'H'-'H'--':'-'i ....... H'"H ...... H-'H ...... H'"H ....... H"H "T-?-?T"fTTT'TT"?"T'T'T'TT'~ ....... T'T"?'T'TTT'T"? ...... ~-'t'TT'!"';'"r'~'"?"i'"~-v'r'~ ....... ~'"r'r'r':"'t"f"f'ff ....... f"f"t"! ....... f't"f"i ...... f"f"t"i ..... f'ff-ff'"?'"f"t"fff · --~...?--~.--~ ...... ~..-~--.~-.-..~-.~-.-v-,.~ ...... ~--.~---~--.~ ....... ~-.-~---~.--~---+---~--.,-..~..., ...... ~.--4.--~--., ...... ~---4.,.~.-.4 .... '-.~.--4..-4-444~,4...4...4...~ ....... ~...~...1...4 ....... ~.-~...{..-~,-.-4..-~.-.'...4 ...... ',..'...'...' .... '..''' · ..L4...L-L.[..L.i..i.....;..i..i..L.I..LiiJ ;i.L.i 1i iii ~ilall ~ ~ ~[Xi ~ ~ i ~ i i : i i i i i i i ! i i , i i i I i IT i I "~'l'"l'"? .... · "?'v?"'?T'~"?"?"?"??r"t"?'??'"? ...... ?"?"??'T"??"?'~ ...... ?"?"?"~"T"???"? .... ?"?-~'"? ...... ~'"~-"~'"'~ ...... ?"??~ .......... ~'"? ............... ~ .............. i.--* ....... + ..... ~.-*..-~...* ...... {..+..~...+ .... .-!-.i.-.i--Lt---i--i-..i.-.,..i--.i-.i-..!.-!-..i.-.i-.-!...~ ....... i---i--.i--.i---i.-.i---i---i.--~--q-.-i.--i-.!---t--i--.~---i---i.~q...i.-14 ....... ;..i-.i4 ..... i...i4-.~...,...¢...~...~...¢...~4-.i4...~..444-.i ...... ~...i4...i ...... i...i...i4 .... '"i?"!'"t"~"+-t"t"'"f"t'+'+"f'+'+"i-"i ....... !---%.i---i---~.--!.--i--.!--.i ....... i.-+-+-+--l.-+-.{-+-.i ..... i...i.-!...~---..-.~--.{--.+..+ ...... ~.-.~.-.{-.~..+..~...{...i...{...;...i.,-i..-i---{ ....... i.-.~..-~.--~ ....... ~...~...i.-+.-i...~...¢.-.~...~ .... --+--!.-+-i ...... ~.-+-.~---,--!---i---~---~--i---i..-+.--{..-~ ....... {---{---~---i---?{---i---i---i ....... +.-.~-..{...{ ...... ;...;...a4 ..... ~...i...~.4...'...~...;...~...~ ...... ;...;-¢...i...I...4...;..4...; ...... i~.~-.~.-i ....... ~...i..4..4 ....... ~..4...;..4 ....... i...L.i...i .... --i-+.-i-~---I-.;..~-.-~....--~...~-..;---~-.+-.¢-.-;--.~..-~ ....... ;..4...i..4.-.1-4...i..4...i ....... ~...;...~...~...[;...;..;.i ..... .4..14.-;..i444.--..44444-..i...i...4.4 ....... ::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::: ]"*'"*'"*'"~"t'''~''~'''*'''' -'~'''*'''* -'~'''~'''*-"'''~'- *iii ] ~ i i i ~ i i , i i i ~ ....... +'"~"'~'"~'"~'"~'"~ "'4'"$ ] i ~ J i ~ i ! ! ....... ~---~-.-%.--%.-.$-..4-.-~---~! i i i i i ! i i ........ ii im~ ] j i j4'"$'"4'"% ...... $...%.-.%-..% ....... ~...~i ! i i t i i i i '~ '~ .... ~ % ~ 4 ~: : : : 4 % 4 %1 ~ ~ i4 4 4 4~ i ~ {% 4 4 ~: T ~ ~' 4 ' .~...1...~...~...1...~...~...~...~..~...~.~...~...1...~...~...~...~...:...~...~...~...~...~...~...~...~.~ ....... L~.4...Lt...L.LLL,~...~...LL.L~ ...... ~...~...~...~...I...~...~...~...~ ....... ('i--'i'"i .... ~..~...~...~...~..~...~...~...~..~...~...~...~...~...~...~...~...~...~...~...~...~...~...~...~...~...~...~ ....... ~-.-~.--~---~--~--~-..~---~.-.~...,~ i~.~...;...~...~-.~.-~ ...... ~-..~...~..-~-.i..-L;..:--~ ....... ~..~..-..~..,...LL:..~._ ...... ....... .... 4...~...¢...I...¢...¢...¢...~ ....... ~...~...~...~..-....¢...~...~...~ ...... ~..~...~...¢......?..~...~...~ ....... ~-.~...~...~ ....... ~...~...~...¢... -!-ff'i?'H-?t" "~-H'+'H'"H'"i'"H'"~'+'r'H'"i-+'~'''H'''HTH'''H'-''~'~ '-;'~--~--4-'* ...... ~'--"-~"'~-+-'~--'~-"-"~ ....... ~--'~-";-~-".+-.~--~--* ..... ;.-~--.~..-~ ....... ~...~---".~ · ":-T"r': ...... r'r':"-"r'-r'r-r',-":--'r-~--'~ ....... r--r-r-r-~-"r--r-r-r-~..-r.-r-r.'r-?--f.-t.-f-...:.~4-.-~.-'~-4-4-4-4 ....... L.L.~.4..4.4.4.4.4 ...... L.;.4.4 ....... ~.4.4.4 ....... L4.4...~ ....... L.~.4.4 ?'r?[.-?t-? "?-??l---?i--i-'-? ....... ?'??"?tt'i'''~-t-?t'rt-?'?'i''':-~i -i--i--'H-'H-'H ....... i'-!-'H-ti-i-i'-~ ....... i-'i'-H--~"i"i-i-'{ ....... i-'i'"H-'~'"H'-H ...~...~.-~...~...l...~...;...;..-..~...,...~...g..+..~...;...~...~ ....... ~...~...~.-~..-L.~.-.~.-4.-4 ...... ~..4.4..4...~...~...~..4...~...i.1~ ~"~"? .~"'~'-~'"t'~"'~'"~'"~"+"?+'+'+"~ ....... ~'"?~'+'i"'?'+"H ...... ~'"~"++"i"+'+'~-~ .... ~:~:,::: ::::~:::: ::::~:::: '"t'~-'t"t'i'"t't"t'"t't"t"t"?'"t"t'"~'"~ ....... t"t'f'f'?f'f"f'~ ...... t"f't"f'F~'"f't"f'~"l:-'t"f'~ ....... f.'f-t--f..'.-?.~-.-~.--t-.f--f.?--f..~ ....... ?!'-.t-f-r'f.+..f.~ ..... f'~'"~'"f"'"~'"t"~"-~ .... · .-?~~-~-.-~ ...... ~.-~-~-- ..~*---~- ~---~--.~--~ ....... .---.---~.--4 ...... ~...~...~-..~ ..... 4...4...~..~ ...... ~...4-~--.~ ...... '"?"?"?"~'"~'"?"?~'""?"?'?"?'*'"?~'"?+ ...... ?~"+'+"*'"~"+'+"+ ...... ~-+"+'+"I"+'+-'+-+ ..... ...~.~+.+.+..~-~'"f'ff'"~-'f'ff"ff"ff ...... ..... +..+.+.+.+.+..~..+..+t'ff"ff"~"i-'t'+"f"~ ....... ....... f"~'"t"+-'!-+-~+"+~..+..?..~ ....... ~...~...~...~ ....... ...... +"+'+"~...~...~...~ ...... ...... +'+"~"?~..4...~...~ .... I ..... ::: :::: ::~: ~::: : :: ,: , ~ :::: :::::::~: :::: :~:: ~,~ '~"~'"?~ .....t ?"?"?-?"~'"~'"?*"'~'"?'?"? ....... TTT'TTT'TT'? ....... T'TTT'TTTT'~ ....... I"T'T'i'TTT'? ...... ~'"r'r"r"i'"r'r"r'~ ...... r"r'T"~ ...... ~-T"? .......... ~'T"r'?'",'T'T'T"~ .... "tff'ff'"t ...... H"i'""H"i"i"'i"i"i'"H ....... ???".'"?,'"~, ....... ?'?,'"?"?~ ........ ??-',"'??"?'-,"+'~'"~"'.'"~-'-~'-+"? ...... ~"+-'?? ....... ~'"?? ....... ,'-'? ....... ? ....... ??-'? .... ::;::i::;:::i:::..__ ::Fi:::i::: :::::::::::::::::::::::::::::::::::::'"i'"i'"!'"H'"!'"H'"i ....... !-"H"+'+-+'-H--.i..- ................ "!'"i'"??Yi'"?'i ....... i'"i'"i'"i'"1'"i"'i'"i'"t ....... I'?Rq:H"i'"? ....... ?H"i~H"i"i ...... H"i"i ....... H'-H ....... H"i"i ....... H"i"i'''~ "?-'???'"~'"?'??'",'?'?"~'"~ ...... ~'"J'"~'"~ ....... ~---~'--~-'-i'--i---~...~-.-~.-.~ ....... ~.--~---~-.-~ ...... ~.-.4-.-~...~ ....... t-;...;...4 ...... '...~.-~.-.~ ....... ;.-.~-.-4.-,~.-.I..,~...~...~.,.~ ..... ~...~...~...~ ...... ~..,;..4...; ....... ~..4..4...~ ~.4..4...4... ...~..i...i.4 ...... ~...i.4..-.-~.4.4-~...I.4.4...~.4 ....... ~-..~.4.4.4...i.4.4.4 ....... i...~...i...~ ...... L4.4...i ....... i.L..~l .i...i ....... L.i...L.~...i...i...~...i.4...L~...i...~...i ...... i...i...i.4 ....... ~...~.4...; ...... i...i.4...i... I''+'+''!'''~'''f''i'''~'''i''"'''~-4'''~'''½'''?'~'''!'''~'''~~ ! ! . ! ! ~ ~ ! ! ~ : ~ ~ ! ~ ....... ~'"~'"~'"~'"~'"~'"~'"~'"~ ....... !?..H-.H--H----i.--i.-~-.~.-Li.-i-.i.-i-.-:i--i...~-.! :-'v"r'-r-~ ..... r'r"r"l-rff"ff-'~ ...... t'-f-ff--~ ...... f"f-'f-~ ...... ~"'i-fi ..... ~'"r'~--~,'f'~-~ ....... ~-e+..~ ...... ~.-+-+-~ ....... +..+-+.+.-'-.+.+.+..~ ...... ~.-+.+-e.t..?~-.+.-? ....... ~-.+..?~ ...... ~..+.+...i... --W-'t-t-!"'t-'t--t---~t-t-t"!-'-?-~---~--~ ...... ~--'~--'~-'-? ....... ~'"~-'-H ...... ~ H .... ~ ~.~+...+++-~--.I.+-H.-.~ ....... H-++..I-..H.-.H ....... H.++-~-.-H-+-~ ....... H..-.H-..!.+.~-..H "~"tT~?TTT'' TrT'?'!'"??' ???' ...?T..T..~I~IiI~llllllT...~".?..??T..?~...?~..+..i."~..+..~..+.+..~-i...~...~."~.~...~...{...~...~".`..+~...~...~...~.4...i...i...~...~...~...~...~..4 ...... ~...i.4...;...~...~...i...~...i...~...i...i...~..,~ ....... i.-i...~..4 ....... ~...~...~...~...f..~...~...~.4... .+_t..ff..I.T..~...~_...~...~._ff...~...~...~...~...:...'"~'"?"~'"~ ...... ~"',"?'", ...... ,"'?"~'"~ ...... ?"?",-', ...... ::::::::::::::::::::::::::: ::~:::~:::~:::~:::':::~:::~:::~:::~::::...~...~...~...~...'...~...~...~...~.......~...~...~...~ ...... ~...~...~...~......~...~...~...~.+.~...~..~...~..'...~...;..~...~...~...~...~..~...~...~...~...~...~....~ ....... ~...~....~...~ ....... ~...~...~...~...~...~_.~....~...~_. --i--i-i-.i--t...H.-i--i ...... ffH.-i--~-H..i--i ...... H-'i--i---i-i"-?"H ....... H'-i---~"-i'+i"i"i ....... ?'i'"'H ..... H-i--"~ ....... i"i'"'?"~-'i'"H'"~'"'?' -8000 ~000 -4000 -2000 0 2000 4000 6000 8000 ~EST Ef:~T WELL' K-14 ( 1 909'' SNL, 1174' EWL, 'C 4, TllN, R14E) VERTICAL PROJECTION ~SS. -4000 -2000 0 0 2000 4000 6000 BO00 ! 0000 · -T-'~-.-?-'-*; ....... t--+-.-k..4 ....... +---.k..H-~ ...... +'-'H-.;--'4.-' ~-.--:.--.F--~-'--; ...... .;..-?---H-~ ...... f....4..+..,: ...... H-..;..--.;.--~ ..... ~: .-.i...H.-b..~----k--*:...H.~ ...... ::'.--i...'i'"~ .......~t ?'--H.'k'--! ....... ?-.;-,f +-.l--k-f-H-~ .... ~-i--i--i-'t ...... H :-4-. -.~...,~....L--~ ..... ¢...~,...4-4 ....... 4...`[...~...L..~-&.,L..&.L !...&..i...LL..~._~...L..,L..¢ ...... 4...¢...~,...J,...½...¢...&.~...&....4...&.¢...,L..~...L..~...&.~ ....... ~-.4...~...&.`[...&.`[.. ~...L...4-. ~. ,~..4 ...... L,.&4 ........... ...i...Li L.....L.L.L; ....... LL.LL.LLLL.L:i..LLL:':,...L..L.';..L.Li...L.i...LL.i...'LL ;...~ ....... LLL.LLL.L;...~ ...... L.i....!.._L.~...i...LL.! ...... ~. i.X...L!-LZL; ....... .... i'--!---¢'"{ ...... H--!"-f-':'-H"!-'-+ f"i.-.H----i--!-'~H-H'-i .... H-'-i'--ffi'--'i---{----i ....... ~'--f'f-'?-{"--i"f'f'-} ....... f-i'"-?'!'-'k'i-'-i"'i=i "+"?'-?"i-"i'"-i-"i'H ....... ~..i...L.i...~ ....... L.L;...~, ....... L.;._L~ ......l t IL.i...LL.: .L..L.;...i ...... L..;..L.L.-.4...;...;..;..LL.L.L.~ ...... L.L.L.i ......l ;...;...;...; ...... L.L.L.L.LL..L..L~ ...... L..; .L..~ ......t LLL~ ....... .... ~'"~'"?'" ;~ ...... ?'"?'"?"? ....... ?'"?'"?"*?'"'~'"?'"?'"?-'-? ..... ~'"?'"'P"?" ~'"?'"'~"?"'? ....... ?'"?'"'~"'?'"t"'?'"'?'"¢'--?'"i '"'~'"?'-'?"*?'"'t'"'~'"-~'-'¢'" .'? ....... ?--'?--'?'"? ....... ?-"?'..'.~'--? ....... ?..-?--?-"~ ...... ?-?-.?-.!' ...... --t.--t--,:-t ........ H..+-.~ .... H..+.+.-!..+.4..4...f.. ]~]-b-.,:.-+-.t--,."-+4-~-.-b-.b+.-f++..f.+..f ..... :."-.H'-'H--.-F+-f.-+ ...... -b+-+.....k.I--.H...H ...... +-+...H..-b~.-+..;---.~ ...... H.--H-t'+-~---H"- .... t"-t-'!--? ....... t'-i"i'"t ...... H"i'"? ....... ¢"i"i"?"_':i~'?'S.~. f'i"i ...... f'i'+'t'"t'"?'r? ...... i"'?'t'"t'"t'"?'!'"? ....... f"?r't"'!'+i'"~ ....... t"i"i"i"'i"i"i"i'"! ....... i'"?'"l"!"f"t'"f .... '-i---!"'i---* ....... H..-H-~...H.-H ....... i--H-.-! ....... i.~.!~..~`~~~...H~H.~.i.~H...H...~..i~.~!...i~H~.H..~i~.!...*..~H~.~bh~H~.i...H ....... H...H ....... H..-!-..-; ....... .... y'?'¥'? ....... ?i----i"~ ...... t---c-'-.-.:--? ........ i'"?'i;'"~'~'~'[~I-"~'?'"? ....... i"'!"'?'"?l'"i'"?'"i'"??"?'"'i'-'?"T'?"??? ...... i"?'"i""i"'i'"'i'"F'i'"?'":'"?'"':: ....... i ...... F!?i ....... f..t.--¢..-t ....... :.'~%t---t ...... t.--t---t---? ....... t--f--?~-'-:---}--'~-'-¢"'¢"T'-¢---.*;'-~- "~.*..'"'~'"i"'i"'¢"'.¢ ....... ~'"i"'¢"'¢'"f"~'"T..'"'f"¢"'."'¢"'¢'"?;'"i"¢'¢'"}'"¢'"i ...... t---f..f...~ ...... }'"¢'"f"i'"i'"t"¢'"}'"i ....... ?¢'"}'"i .... -'F,'"t"~ ....... ¢'"t'i'"i ...... ¢'"i'"i"i ...... i"i"i'"?":'"'?r"r"?F..'"'r'y"r"~"r't"'?'T'?"'r"r'~ ....... '?'F'r'T"?'"r'i'"~ ...... '~'"~'"~'"'; ....... ="F?'"~ ...... i'":...'"F? ...... .:-T?q ...... '","?~? ..... :.*-T"*:"T" "'?.-?":~? ....... FT'-F?'!"T"T"T'T",-'?'T"T"? ...... : '?.'"T'":.'"'FT'T'T"T ..... T"T'T"? ...... T'T'T"T" -T'T"FT" '-T'T'T".T ...... ?':.'"T"T ...... r'F".:-?'~"T"T'".':'"r" -".*"'??"? ....... *.-'-?'-'~'-? ...... ?'+'+-': ....... ~'"'*"'.*'"?"l'"???.'r"f"?'"'?.'r".'t ....... ¢~'~"":L-~m"?"'? ....... ?.*-.-?.'?..~...?-.'r.--?.-.?-.-!...?.-?---'r-.-.t ....... ?.-.'r-..-r..'~ ...... ~---'t-..~--"r. ....... +.-.'r..?'--~ ...... -:H-bb.--H..-H---bb;:-+-H.--H.--bbi4..bbi4+-i.-bf ..... b¢-:.~i-.bbi...i ....... i4..bi.H..bbbb;.'...bb-b-.4...¢..4--} ...... bCH ....... H...H.--i--bbi-.b ...~...-.z....4..-4. ....... 4...4..4...4. ....... *-'-4.'-'~'"'~'"+"4.'"4.'"'~'"~""'"'4.'"4.'"4."* ...... *'"'~'"*'"4. ....... ~""4."~-i-:~h?"4.'"~'i'z"?';-"~'"4.'"f";'"'*'";'";'" !"'&'4."*'"* ....... '~'"4."4."'4. ...... 4."4."*"'* ...... 4.~'4."4.-'~-t-'4.-+-;-'~ · -.;.-¢.--¢.-.,~ ....... ,':..4..¢..-~..-H...b¢...;...L.L¢.-.~.....b¢-.-~....i..-!-..LH...¢ ....... H.--~...H--.J ¢...~x~...,':...H..+..H...b¢-..~-..¢...~.4...L.._..H....? ...... ¢--..i...bb~.L.h.;x ...... -.~---?-~i%-?--t---?.--.t---~.--?-i--i.-i..i---~-. '--~ni-?:'":: ....... ~--.-..'.'...~-i ....... i.-i---?.-!-+-t.-.~...i-i ....... ?.?.i.Vt:.Ri~.-i..~.Ai[~...!.-.~,£i~.t:-.I~.-i ..... i-~..-r-t-. -..~.,..~....;-,.,m..........,..:,.... ....... .~-.-.....~...~...-~.---~....-..-,',,',~-....-~..-~....-.....+.......;...-~..--~ ....... ..-,...~....~...............4....;-~ ,..-.~.,-~,,.~.,,..~....~...4.,.;...~ ....... .-.....4..... ....... ....~...;,.... ..... 4...,...~.... ....... ....4....;..., ...... -.+..~.-L.L.'..~.-~.-.t-~ ..... ~ ................... ~ ................................... .~ .................. ? ....................... 4. ................. +....~...~..; ..... 4...~.....~..+..r..4....4....~.-; ...... ;-4....~..+ ...... ;'"4.'T"4.'"t'"f'+" · : = : : . : ~ . : : : : : : . : : : : ~ : : : · : : : , = : : : . : : : . : ,, : : : : . : = : : t : = . ~ ~ . : , ~ = ~ : · ..¢--4-..4...~ ...... 4...4...-;.-¢ ...... 4.-.4....4...4 ...... 4.--4-..' .... ,;...;-..4,...4 ...... 4.--;--.4..--~ ....... ¢-.4.--4...4-.-I---4.--4.-.4.-.4 ....... ¢-..4...; ..... 4...4.-..~.-.4 ....... 4.-.;,.--¢---;, ...... 4...4,.-.~--.4. ....... ~...4.-..~...4.... -..4...4....4...-4.-- b-4.-4.-.L.? ~.i...i..-¢.--~ ..... ~--L..~,..-i ...... ~---i..--~.--i ..... *'-..i.-.: ' . -i-.i-..J,-.i...H.i...i..'.i...i...~ .-i...L-.-~,..L..l...-L-.i-.i--`[ ....... ~...-L...~ ........ -L-.L..i--.~ ....... -~.-~-.-i-.~, ...... i.--,[...~-.-~ ....... ~...L..~...i ....... ~ ....... ~-..4 ........... ¢...¢-..-~ ...... ~...~...i...,L.. '"?"'t-'~?'" .......... b"?'~'"'~'t ....... ? ........... i ! ?'I"'?'-*'"'~J~l ...... ...... nl~hh{ : ~ ! ~?'"? ....... ? ..... q ?'"?'-?'"? .... ...... t ?'-?'"?'"? .... ....... ~~?'"? ....... '"'~"?'"' .... ! .............. ....... ?"?"'??-'~-'""'*"'?"'? ....... '"'?-?-? ...... 1 ?'-*'"?"~ ...... ....... ..-~--.L!4 ...... 4--.LL! ...... LLL4...~...i...;..~...i-..L~...b4...Li-..L..~...~...~...i...L.~...Lb;...;.4 ....... .i....!...;...b.b~...L;.~...~...L~...LL.i...LLi ....... i...i...;..i ....... i..¢-Li ....... -+H'-i ....... '.'.'+H ....... ,.'"+4q-+H'-'~- +H'+H'+H ...... k-H-'+'i-+-':"H ....... ,:'-';'-++-i-H"H--'~'-4-~4~..~.~ 4--H--4-++".':'"~'-i'+'4-"; ....... · 'i'i' +-'?. ...... i-i .¢ ';" ' .+ i + ';' t-?---f--ilar "f"i'i'f ....... i' .t-f...? ...... f'f"f"i"T"f"i't"~ .... .t i"~"i'"r"f'*:' t-.i ....~]].? ~ i': ,4,-'~"i-'?.' ~"~ ..... f"t"'t'"'r",'"*:"i"i'": ....... :*--'r".*.'"r" "?"r"t"T- i : ; : : : : : ~ : : : : : : : : : : : / : : = : : : = : : : : : , : : : ' : : : : : : : : : : : : : : : ~ : ; : I ..-4..-.~--.~-.,~ ....... .4--4..-.4---~ ............... 4.-.4..-4 ............ J~, ....... 4 ....... .4...?...~ ........... ~ .................. -~--`[..-~ ....... ¢-..4 ....... 4 ....... 4...-}.--.~ ........... 4--.+ ................... 4---,[..-4...4 ............... ~ ........... ~...~ .-~--4.-%4-? ...... ......... ' : : : ' : : : :t : : : : : ~ ~ : ~ ~ : : : : : : ' ~''~ ': '~" +.,:..+-.~....-4-;-4-4--.-4-H+H-H= .H--H..i+H...t.--:-+-..H..--;-{-++.-::--+-,..-f.iq.-.,;-.F.-.t.-.,;.-..,.:.-...T.-.;--.?:.-t--.-t-t-fr-'--.?.-?.--..,."-T.. bi-'"'"" ....... '"""-?'"-~ .... '-t"T:'-f-! ....... f"f":?:-'! ....... f"t'"f"t'T".;'"..+"'t'~ '"T'TDn~nt'"t'"¢'"t ....... t".;..'"~"t'"T-t'-t-'t'"'..:'";"T'T'T'T"T-.'..-'.':"T"? ....... T-T"T'TTT'T-T"? ....... T'"T"'T"'~ ...... ~'"f"f"! ....... f"i'"f"~ ...... "'?"T"T'"T ....... .?'"T'"T'"? ....... ?'"?"~'".*.'"t'"T'"?'"? '?: ...... ?.'"?'"'..'"?'"t"'?'"T"'?'"?'" r'-?-.-?-'-?.'? ...... t'"',~'"?'"?TM '"?'"?'"t"'t'"t'"?'"t"'+'"? ....... ~'"y'"~'"?'"t'"?'"~'"?'"? ....... t'"'?'"y'?'" ,'"t'"T'"t"'*. ....... ?'"?'"t"'? ...... ?-'?-'t'"? X::=Li::::':::t::;:::i:::i:::: X:::i:::t:::~:::Li:::!:::i:::L: X:::Yi:::LI:::~:::~:::!:::i::: ::::i::k:Li:::: :::!::k:::::? :::ki:::i:::i:::I:::ki:::i:::i::i :::i::i:::i:::i:::Li::Li::i::: X::.t:~::i:: :i:::::!X:::: :::!::!::!X::: .... ~...~..~ ~ ...... ~ ~ i-~ .... ,:.; ~ 4 ...... ~. 4..~.5 ....... t..&..L.L.'...;...~...&.; ....... &4.. 14 ....... &.~.. ;-..~ ....... i...&.L.~ ....... L.~...~..~ ...... ~...L.~..t..L..~...~ 4.4 ...... L.&.;...L.,-..~,..&.t.4 ....... -~.--~-.-,[..-; : ' ~ ~ .+?..+.-~ ...... ~-++.+-.i.++.+.-? ....... t--+-+.+++.+.+-~ ....... ,-.+-+.-~ ....... i.-i...!...~ ....... LL.L.L !...LLi...i .... , , ~ ~ ~"~'"~'"T r"c'r".~ ~'"~'"~'".~'"' ::: ::: ::: ::: ::: ::: ::: ::: ::: :::'Z ::: ::: ::: ::::...;..~.4..~ ...... ~...L~...~ ...... ~...~...~..~ ...... ~...~...,[...~...t.~...,[...~...~...~...~...~...~...~ ...... ;..L;..~ ....... ~...L~...~ ....... t"-r" .?"-*: ' ...... L..&.L.i..4 ..... &.&-i...~ ...... L.t..&.~ ...... &.&.i...i ....... i.-i...L.~ ....... .... i-T"T"T ....... T"T'T"T ...... T"T'T-T ....... T'"T'"T'"? .... .... 4.-4.-..4--4 ....... 4..--4-..4-.4. ...... 4-.-4..--4.-.4. ....... 4.-4---¢-.-4 ....... 4-.4,.-.4--.4--4-...~-4---4...4-.-.-.4,--4--4--.4- ..... 4---4-.4*..4--. ~-4---4-~4-.-4 ....... 4...4...4-.-4 ...... 4.-.4.--4..-4 .... ;-.-4..-;,...4 ...... 4.-..4-.4..-4 ...... 4...-4..--4.-..4. ....... ] ! ! .:- [ i ~ : ~ i : i : : : : i : : i : : : ~ : : : i : , : : : : : : : : : : ; : : : : ~ : : : : : : : : : : : : .... : ........... : ....... ? ........... 4. ...... ,...4...., ........... ,...4....4....4. ........... 4....4. ....... ½...4....4....4. .......... 4-...,-.,..,.... ..m.4....,...,.- [.-,...4.-.,..., ....... 4....4.1..4....t ...... 4....4....4...., ....... ~...4....4....~ ...... ?.-4...+..? ....... +..+.+.., ....... +...t-.-?-..t ....... ?..14..-..t.-.t .... lJJ!JJ~Jll~lilt ....... iJJJ~I jj~j'j~ ...... ~JJJ~JJl~lJJ~ JJJtJJJ~ Jll~lll~ll'~ ....... ~lJ J~lll~llJ~Jl Jt--J~Jll~lJl!--'~JJJ''+'f'f"i--:'~f+'f''f'~--i'''f''i'''~ ....... ~lli~J'l~lilt ...... ~'JJ~lll~JlJ~jj j'l%'}'''?'',.-t+t..-t.......t-..t.-.t-,.t.......t.-.t...t.,.t......t+t.,.t.... .... T'"T"T"T ....... T-'T"T-? ...... T"T'T"T ....... T'"T"T"T '"T'"T"'T'"T ....... T"T'T"T ....... T'"?T'T"~-TT'T-'T ..... T'T'T"T ....... T"T"T"T ?'-T"T"T ....... T"T"T"T ...... T"T"T"T ........ !"'T"T"T ...... T'"T"F'T ...... T'"T"T'"~ -.;...;-.4...4-.- .4.-.4...4...4... bb4..H ....... bb44.-4...4...;..4...4 ....... H...4...; ....... 4-.4-.;-4 .... ~¢4-¢.....-4..4...4...4 ...... 4...;......"-,4 ....... 4......."...4...4 ....... ;-..4...4...4 ....... 4...4...4...4 ....... ;--.4.-.4.-4...[...;...4...4...4...{..-4-.-4...;-..4... .... .-.-¥.,..,,-.H.,j l .~,-,.-, ,.-,..-,-., ...... ??,-.., ....... :--?,-, .... ,--,---,-, ....... ,..-,.-.,...,...I...,...,...,..? ...... ,-..,.-.,.-,q.--,--.,...,.-., ...... ,.-.:--.,.-.?--1---,..-.,...,..,?. ....... :..~...,..,:.+.:...:...:...~... --.b--&-~-~.~---~-&-~.:' .... ~,-.L.J,.-,[-.,...;..L.&.,~ ...... L.J,...;_,[...,[...&-L.&..; ....... &.J,.4...~, ....... ;...{....L.4 ....... ~...&.,L..&.t..t..&.~...~ ....... ~,...{...&.&.,[...~...;...;....~ ...... ;...;...~...&4...~...;...,[...; ....... ...;..&.L.i..q....L.L+-i ....... L.L.,L..~ ...... ;...,L4...`[ ...... ~...L.L.,~ ...... &.J,...,L..&.~....L..&..L..L.,..&.,[...L.~ ....... ~...&..L..~ ...... ~,...t..t..~ ....... i...;..4...; ...... L.&.;...~ ...... L.~...L.~ ...... L4-4-.~ ...... 12000 176. PROdECTION ON VERTICAL PLANE 17S, - 9SG. SCALED IN VERTICAL OEPTHS HORIZ SCALE = 1/2000 IN/FT .~)o r, cla,d AIo$I- a F',odu¢ Hon Compon¥ PO ~o, 196012 INDEXED DAI. L.,\S ARCO STANDARD CHEVRON ALASKA PRODUCT ()lq EXXON 0ate: 02~24~88 TEXACO 78597 TO: T#: MOBIL PHILLIPS CSTA~ REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material ts being submitted herewith. Please acknowledge receipt by signing a copy of this leTCer and returning It to this office: 02/02 88 02/08 ~88 02/08 I88 02/12 t88 02/12 ~88 02/03 188 01/27 t88 02/02 ~88 02/04 188 02/04 ~88 02/10 ~88 02/13 z88 01/28/88 01/24 /88 01/23/88 02/03 z88 01/25 z88 01/26 ~88 02/15 z88 02/10 ~88 Camco Static Gradient Camco ,i ,, Camco " " Camco " " Camco " " Camco " " Otis " " Camco " " GO " GO " Camco " " Camco " " Otis " " Otis " " Otis " " Camco " " Otis " " Otis " " Camco " " Camco " " Received --- ]-- .... Victoria Aldridge Date .... S~ondo,d Alaska Pr o,duc ~qon Company 900 £o,., ~en,.on Boule~ PO [~o. 19601~ .%n( ho¢ooe. AIo%kO 9~ INDEXED DALLAS ARCO CHEWO~ STANDARD .ALASKA PRODUCTION EXAXON TEXACO Date: O1/26/88 TO: MOBIL T#: 78486 PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being subml?¢ed herewith. Please acknowledge receipt by signing a copy of this letter and returning it ?o this offlce: A-12 A-13 B-3B I>-3 D-18 D-18 F-8 F-19 H-9i J-28 K-12 K-13 K-14 Y-24 CCL/Perf. 12/23/87 #1 8100-9230 GO 5" Caliper Tool(Multifinger) 01/10/88 #2 100-8650 Sch 5" Spinner/Hydro/Temp. on coil tubing 12/17-18/87 #1 9500-11055 Production Profile 01/08/88 #1 10400-10660 Camco 5" Cont. Flow Survey 12/27/87 #1 10900-11200 GO 5" Temp. 12/27/87 #1 10800-11200 GO 5" Production Profile 0t/16/88 #2 10950-11250 Camco 5" CCL/Perf. 12/25/87 #1 12200-12830 GO 5" Injection Profile 01/10/88 #1 9500-10000 Camco 5" Production Profile 01/12/88 #1 10790-11030 Camco 5" Production Profile 01/08/88 #1 9150-9370 Camco 5" Production Profile 01/18/88 #1 11800-12100 Camco 5" CCL/Perf. 12/22/87 #1-4 10950-11730 GO 5" PIT/Ftowmeter 01/09/88 #1 12828-13450 Camco 5" GO 5"/2" -'- 0'~ & GaS. Date . ]-~ Utt~-- ~ Well Records LR2-1 INDEXED DALLAS ARCO CHEVRON EXXON TEXACO Da*e: 01/20/88 TO: blOBIL Y#: 79452 PHILLIPS STATE OF ALASKA GEOSC IENCES STANDARD ALASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge .receipt by signing a copy of this letter and returning It to thls office: ~C-17 ~C-19 ~ C-20 ~ C-22 ~ H-02 ~K-14 PITS 12/29/87 #1 10950-11360 Camco 5"' PlTS/Flowmeter 12/31/87 #1 10950-11360 Camco 5" CCL/Perf. 01/11/88 #1 9600-11541 Sch 5" Perf. Record 01/16/88 #2 11305-11572 Sch 5" CCL/Perf. 01/14/88 #2 11044-11476 Sch 5" Completion Record 01/12/88 #1 12017-12433 Sch 5" CCL/Perf. 01/15/88 #1 8625-10060 Sch 5" CNL-CH PORO 01/13/88 #1 8450-9072 Sch 5" Production Profile 01/06/88 #1 11500-11730 Camco 5" Production Profile 01/06/88 #1 8800-9350 Camco 5" PITS/Flowmeter 12/30/87 #1 8850-9300 Camco 5" Anchorage Rece i ved Victoria Aldridge INFORMATION CONTROC Well Records LR2-1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS · Type of Request: Abandon [] SUspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other [] 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 ¢. Location of well at surface 1909'SNL, 4106' WEL, Sec. 4, T11N, R14E At top of productive interval 2750' SNL, 3811' WEL, Sec. 9, T11N, R14E At effective depth At total depth 3356' SNL, 3852' WEL, Sec. 9, T11N, R14E 5. Datum elevation (DF or KB) KBE = 53.22 feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number K-14(23-9-11-14) 8. Permit number 87-95 9. APl number 5 0 - 029-21752 10. Pool .Prudhoe Oil Po°l 1. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: true vertical measured. true vertical Length 80' 2684' 10802' 1226' measured true vertical 11800' feet 8991 feet feet feet Size 20" 13-3/8" 9-5/8" . Tubing (size, grade and measured depth) 4-1/2" 5-1/2" .* Plugs (measure~l) ,Junk (measured) Cemented \ Measured depth lrue Yertic~r'~lepth 8 cu yds concrete 110' 4185 cu ft ArcticSet II 2720' 2375 cu ft Class G 10830' 414 cu ft Class G 11800' 12.6tt @ 10485'MD 17tt@ 1997'MD 110' 2681' 8337' 8991' R CEilfED NOV ~ 0 Lq~7 Packers and SSSV (type and measured depth) Packer@ 10501'MD SSSV @ 1971' MD Alaska 0il & Gas Cons. C0mmissJ011 Anchorage 2. Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 3. Estimated date for commencing operation 4th Quarter, 1987 4. If proposal was verbally approved Name of approver Date approved 5. I hereby certi~ .and Signed~"~' , .. ~J _ correct to the best of ~ny knowledge Title Division Drilling ~ Commission Use Only Date Conditions of approval Notify commission so representative may witness IApproval No. [] Plug integri[~ D BOP.,,.~est [] Location clearance I Approved by ~/ ~ /~ : ....................... by order of , . Commissioner the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate PBU NELL K-14 (23-9-11-14) Permit Number: 87-95 Approval Date: 9/8/87 Well Status Well operations were shut down after running 4-1/2" x 5-1/2" tubing, nippling down BOPE, and installing the tree. A DIL/BHCS/CNL has been run in the 8-1/2" hole and a gyroscopic survey has been run from PBTD to surface. The 13-3/8" x 9-5/8" annulus has been downsqueezed with cement and filled with non-freezing fluid. Remaining Drilling Operations The well will be completed by perforating underbalanced with wireline conveyed guns. Perforations to be consistent to current development strategy. Flow well for simple cleanup. Install sub surface safety valve in ball valve nipple. MAW/kb/2222D STANDARD ALASKA PRODUCTION Rig: Nabors 18E Well: K- 14 Daily Drilling Report-- PRUDHOE BAY September 10, 1987 at 0600 hrs Current Operation: Nipple up riser. 0600 Depth: ' Day: - 1 24-Hour Ftg: ' Water Used: Moved to K- 14. Nippling up. Mud Type: WT: VIS: PV: YP: FL: Solids: Temp: °F SURVEY MD ANGLE DIRECTION TVD SECq'ION COORDINATES DLS DAI.I.AS ARCO CHEVRON EXXON TEXACO TO: biO B I L PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED STANDARD Al. ASk'/'. Oate: 11/06/87 TI: 78298 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: ~ C-11 Perforating Record 10/31/87 #1 ~F-01 Production Profile 10/23/87 #1 "-J K-14 CBT 10/30/87 #1 ~ R-07 Injection Profile 10/23/87 #1 ~R-23 CCL/PERF. Log 10/23/87 #1 ~ R-26A Temp. 10/16/87 #1 ~/ R-26A Borehole Tracer 10/16/87 #1 ~ U-3i Inj.Prof. Flowmeter Temp.10/24/87 #1 8400-9916 Sch 5" 8650-9152 Camco 5" 10400-11750 Sch 5" 9600-10356 Camco 5" 11250-12153 GO 5" 4700-6350 GO 5" 2039-7785 GO 5" 9100-9520 Camco 5" RECEIVED NOV 1 2 19B7 Rece i ved Date Alaska Oil & (]as Cons. Commission Anchorage Celina Plack I NFORMA/I ON CONTROL Well Records LR2-1 Standard Alaska Production Compan. 9~)0 East ~enson Boulevard PO ~x 196612 Anchorage, Atosko ~519-6612 {907) 564-511 I DALLAS CHEVRON EXXON TO:~ TEXACO MARATHON MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: INDEXED · STANDARD ALASKA PRODUCTION Da*e: 10/12/87 T#: 78228 SAPC OPEN HOLE FINAL LOGS The following materlal Is being submitted herewlth. Please acknowledge receipt by signing a copy of this letter and returning It to ?hls office: DAL/UNIT/STATE: DIL 09/26/87 #1 10837-11810 GO 5~ & 2'''~ BHCS 09/26/87 #1 10837-11783 GO 5~'~& 2" LDT/CNL-poro 09/26/87 #1 10836-11809 GO 5~ & 2"--~ LDT/CNL-raw 09/26/87 #1 10836-11809 GO 5'~ 2" ~ Laserlog 09/26/87 10849-11750 GO 5"._ STATE ONLY: Magnetic Single Shot Directional Survey Gyro'scopic D~rec~~:!j~~~ ~- Alaska Oil &'Gas Cons. G0mmJssi0n A un;, of Ih. o,ig;nol S,ondo,d Gl co~Aia, ch0rage Founded in Clevelond. Oh,o. in 1870. DIRECTIONAL SURVEYS Date: 9-10-87 Date: Job#: 0987-010 Job#: Victoria Aldridge INFORMATION CC~qTROL Well Records LR2-1 Standard Alaska Production Compan 900 East Bens. on Boule P.O. Box 196612 Anchorage, Alaska 99519-6612 INDEXED DALLAS ARCO CHEVRON EXXON TO: TEXACO MARATHON MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: STANDARD ALASKA PRODUCTION Date: 10/02/87 Tt: 782 SAPC OPEN HOLE FINAL LOGS The following material Is being submitted herewith. slgnlng a copy of this letter and returning It to thls offlce: DAL./UNIT/STATE: K-14 MWD Resistivity-TVD 09/10/87 TELECO 7310-8290 K-14 MWD Resistivity 09/10/87 TELECO 9372-10772 Please acknowledge receipt by 11 STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directiona_],~.ey_ Date: ~. Jobf/: GyrOscopic Directional ~1~ ~ J~ Dat~.-~ A Jobf!: Received ~~~ ,,]s~ ~ ~Victoria Aldridge Date ~/' . _ n;~ % G~$ GOnS..GO~$~ Well Records LR2-1 A un;l ot the orlg;nol Stondord ~1 Co,~pony Founded in Cl~-etond. ~,o. ,n 1870 Standard Alaska Production Company 900 Eos! Be,~,,oc, Boulevord PO J~ox 196bl2 Ant ho~ og~. Alos~ o ~5 I 9-60 ~907) 564.5111 ARCO EXXON PHILLIPS STATE OF AK PDBY Systems (Transmittal Only) SYSTEMS (Transmittal & Tape) ARCHIVES STANDARD Date: 09/29/87 T~: 78203 SAPC MAGNETIC LIS TAPES & LISTINGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: K-14 OH Mag tape 09/26/87 Job //373664 800bpi Tape Pos. //05402 3 z/ 0 -open-/, Ol - * EXXON: An Asterisk (*) next to a listing ab,~e means you should have received the Tape~s) a_n/~.k~Pi~n~(s) ctir~q~ly from the respective service c°mpany',//~l~~i ,~~~/~/~, . /~~ SES CO~S. CO~i~u" Vic tot ia Aldr idge .. _ Well R~ords ~2-1 A u,"t Ot lhe ot,9;,o| 5fondo,d 0,1 Fou-ded ,n C~e,elond. C~,o. ,n ~870 September 9,~ 1987 Mr. R. S. Allan Division Drilling Engineer Standard Alaska Production Company P.O. Box 196612 Anchorage, Alaska 99519-6612 Telecopy: (907) 276-7542 Re.: Prudhoe Bay Unit K-14 .......... Standard Alaska~ Production Company Permit No. 87-95 Sur. Loc. 1909'SNL, 4106'WEL, Sec. 4, TllN, R14E, UM. Btmhole Loc. 3439'SNL, 3685'WEL, Sec. 9, TllN, R14E, UM. Dear Mr. Allan: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required ~by law from other govarnmental agencies prior to commending operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. ~fhere a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. Very truly M0urs, Lonnie C. Smith Commissioner of Alaska Oil & Gas Conservation Commission BY ORDER OF THE COMMISSION dlf Enclosure Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Doug L. Lowery Standard A/o~ Production C~ ~y 900 East Ben~m.l~'ulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen= Well K-14 (23-09-11-14) PBU September 8, 1987 In accordance with the Prudhoe Bay Field Rules and Standard's policy for drilling the first well on a new pad or a pad previously drilled, a 20" Hydril diverter system was used when drilling the surface hole on Well K-9. We did not experience any surface gas during the drilling of the 17-1/2" hole on Well K-9 and believe it unnecessary to continue the use of the 20" Hydril diverter system on Pad K. We, therefore, request that Rule 4(b) of Conservation Order No. 145 be waived for K-14. STANDARD ALASKA PRODUCTION COMPANY R. S. Allan Division Drilling Engineer RSA/MSB/pm/2058D cc: Well File #17 A unit of the original Standard O~1 Company Founded in Cleveland Ohio in 1870, 4 C) I IIII ZO 4__o I rlllllllll I I I II I LEthe' ~? I0 20 ~' K-2A (Proposed) 30 ii i OI 02 04 OI O2 32 K-9 (Proposed) I i I ~ I I 8 ~ 9 I ¢58o' hK-14 ~ ~' ~(Proposed) (Proposed) (Proposed) K 7 225^,. (Proposed) . tK-6 (Prqposed) ;,ooo' ?"~ -DJ N ~i K-~ ~oo' r II ~P~ I~WELL K-I(As (Pr oposedP I II [ ~ PAD DETAIL SCALE: I"= 500' PORT ION OF T. II 8~ 12 N.,R. 14 E.,U.M SCALE : I" = I/2 MiLE SUPVEYOR 5 CIERf IFICATE t HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEY'NG iN THE STA'fE 0F Al A~NA, THAT THIS PLAT REPRESENTS A LOCATION SURVEY OF 7HE W~TL[PAD SHOWN AND THE WELLS 'THEREON, THiS SU~,'EY WAS MADE BY ME OR UNDER MY DIRECT SUPERVISION, AND ALL DIMENSIONS &NO OTHER DE'TAILS ARE CORRECT, MO frOM HOtE LOCATIONS ARE FURNISHED BY OTHERS. 9/ ~/$? .~.¢~/_~_. 6 /17'/87 8 /8/85 (~-~ ?/19/85 ~.¢~- ~ !/14/83 10/a /8~ 9127/83 9/~ 2/83 9 /t~ 183 8/~e/e3 7/26/83 ADD K-14 PROPOSED EIHL ADD K-9 PROPOSED BHL ADD K-5 PROPOSED BHL ADD K--8 PROPOSED BHL ADD K-7 PROPOSED BHL REVISE K-6 BHL. REVISE K .5 DELETED~ ADD K-G BHL REVISE K-5 ADDED BHL REVISE K-;5 ADD REVISE K-4 A~)DED BHL REVISE K-3 ADD K-2A REVISE K-3 ADDED BHL REVISE K-2 ADD PROPOSED BHL REVISE K- I SURFACE LOC, FROM PROPOSED TO AS-STAKED, REVISE K- I BHL. - III III II I II IIIIIIIII II Illllllll IIIlrl - (AS -STAKED) PAD "K" Located In N_~W I/~4?_ROTRACTED SEC. 4 ,T. II N.,R.14E.,UMIAT...MER.,ALASKA Surveyed for SOHIO ALASKA PETROLEUM CO. SUrveyed by OCEAN TECHNOLOOY LTD, LAND & HYDROGRAPHIC SURVEYORS 2502 West Northern Lights,Boulevard Anchorage, Alaska A-'12847- 83 - I III I I III IIII I I IIII IIIII STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll-'l,lb. Type of well. 'F-"X'l~lo"~i~ [-I Stratigraphic Testl-I Development OilEi · Re-Entry [] DeepenCII Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Standard Alaska Production Company feet Prudhoe Bay Field 3. Address 6. Property Designation Prudhoe Bay Pool P. O. Box 199612, Anchorage, Alaska 99519-6612 ADL 28303 4. Location of well at surface 7'. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 1909' SNL, 4106' WEL, Sec. 4, T11N, R14E Prudhoe Bay Unit At top of productive interval 8. Well number Number 3200' SNL, 3700' WEL, Sec. 9, T11N, R14E K-14 (23-9-11-14) KOO683449-G-14 At total depth 9. Approximate spud date Amount 3439' SNL, 3685' WEL, Sec. 9, T11N, R14E September 9, 1987 $200,000 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(M0andmVD) property line 28304 1580 feet K-4 35 feet 2560 11925' MD, 8964' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25.035 (e)(2)) Kickott depth 1800 feet Maximum hole angle o Maximum surface 3300 pslg At total depth (TVD) 8800' 4390 Setting Depth 18. Casing program Specifications s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 20" Cond. 80' Surface 110' 110' 8 cu. yds. concrete 17-1/2" 13-3/8" 72# L-80 Butt. 1935' Surface 1965' 1965' 17-1/2" 13-3/8" 72# S-95 Butt. 738' 1965' 1965' 2703' 2703' 3720 cu. ft. Permafrost 12-1/4" 9-5/8" 47# L-80 NSCC ' 4620' Surface 4650' 4500' 12-1/4" 9-5/8" 47# L-80 Butt. 6281' 4650' 4500' 10931' 8295' 2375cu. ft. Class G 8-1/2" 7" 26# L-80 IJ4S 1243' 10682' 8126' 11925' 8964' 340 cu. ft. Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate S ~ P (') R ~,.) / Production Liner Alaska 011 & Gas Cons. Commissio. Perforation depth: measured " Anchorage true vertical 20. Attachments Filing fee~l~r' Property plat [] BOP Sketch E3" Diverter Sketch [] Drilling program [] Drilling fluid pro, ram [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify that the foregoing is true and correct to the best of my knowledge // Si~lned .~ ~. ~ Title Division Dr#/ina Enc/ineer Date~//'~/~ Commission Use Only Permit Number IAPI number IApproval,"d~+'a'~ See cover letter ~-~5" 15o-o'Z~l -- 7. ~¥~'7. I 09/09/87.f°r other requirements Conditions'of approval Samples require..d [] Yes I~No Mud log required~/ [] Yes IF No Hydrogen sulfide measures [] Yes I~ No Directional survey requ~re~ [] Yes [] NO Required working pressure.J~r DOPE 1-12.1~ 1-13M; ,~5M; I-I10M; []15M; Other: ~;'~'~~~ ~'~L by order of ~'"~"8~ Approved by ' ~' ~ Commissioner tne commission Date Form 10-401 Rev. 12-1-85 ( Submit in triplicatu PROPOSED DRILLING AND COMPLETION PROGRAM WELL K-14 [23- 9-11-14] PBU Install and cement 80' of 20" conductor to surface. The drilling fluid program will consist of an 8.5-9.5 ppg spud mud in the 17-1/2" hole, a 9.0-9.7 ppg water base mud in the 12-1/4" hole and a 9.0 ppg water base mud in the 8-1/2" hole. Drill 17 1/2" hole to 2723' and cement 13 3/8" L-80//Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original resevoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to the 9-5/8" casing point above the Sadlerochit Sandstone. Run 9 5/8" 47~ L-80 mixed string of Buttress and NSCC to within 5' of 12 1/4" TD and cement in two stages: First stage using Class G cement around the 9 5/8" shoe. The second stage to be downsqueezed in the 13 3/8" x 9 5/8" annulus followed bynonfreezing fluid. Directionally drill 8 1/2" hole to TD. Run 7" liner from TD to 250' inside 9 5/8" casing shoe and cement using Class G cement. Clean out to 7" float equipment. Change over to 9.6 ppg. NaCl completion fluid. Test casing and lap to 3000 psi. Run 9 5/8" production packer on internal plastic coated tubing with a sliding sleeve. Set packer 50' above top of liner. A subsurface safety va!ve with dual control lines will be placed 50' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. Shut down rig operations for perforating subsequent to rig release. The well will be perforated in accordance with normal practices. Tubing Size: 4 1/2", 12.69, L-80, A/B Mod, BUTT, IPC Tailpipe Size: 4 1/2", 12.6~, L-80, BUTT Note: NUDGE 75ft WEST, ACID JOB, TARGET RESTRICTION (200') SWA: 7-JUL-87 W~'" K-14 [ 23' 9-11-14 ] PROPOSED DEPTH BKB 20" Conductor 110 Ball Valve 1965 13 3/8" Casing Shoe 17 1/2" Open Hole 2703 2723 4 1/2", 12.6#, L-80, A/B Mod, BUTT, IPC 9 5/8" Packer 7" Tieback Assembly 10631 10682 9 5/8" Casing Shoe 12 1/4" Hole 10931 10936 7" PBTD 7" Liner Shoe 8 1/2" Open Hole 11885 11925 11925 PBU SWA: 7-JUL-87 B.O.P. STACK CONFIGURATION 13-5/8 IN. TRIPLE RAM STACK 5;000 PSI WP DRILLING ANNULAR PREVENTER ! I I ! PIPE RAMS l ! BLIND RAMS I ! 2 IN. KILL LINE GATE DRILLING SPOOL I PIPE RAMS l 4 IN. CHOKE LINE I GATE GATE $1$DUA10:[DRAN022.J40]K14 CLOSAP SHORTT.LIS;6 Search Radius= 200 7 DEGREE LEAD LINE For proposed well: K-14 [23- 9-11-14] Location = W-E S-N TVD(SBS) Top 671441.00 5975311.00 -65.00 Bottom 672842.47 5968633.21 8964.00 Note: Ail depths in feet Below Kelly Bushing (BKB) 7-JUL-1987 --- Closest Approach Analysis --- Date: 7-JUL-87 Time: 08:34:33 08:34 Page WELL IDENT Closest Approach /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART A029-2101100 K-3 903.9 0.0 900.0 1.2 A029-2101400 K-2A 1203.4 0.0 1200.0 4.0 A029-2102300 K-4 2170.9 30.7 2167.0 10.5 SUMMARY The well which comes closest to the proposed well is: A029-2102300 K-4 Closest approach distance = 14.9 feet KICK OFF for this run = 1800.0 feet Vertical CLOSEST /PROPOSEDX DISTANCE TVD DEPART 187.6 71.3 14.9 Intersection /NEARBY~ TVD DEPART VERTICAL DISTANCE -. $15DUA10:[DRAN022.J40]K14 CLOSAP SHORT.LIS;22 Search Radius= 200 COURSE LINE For proposed well: K-14 [23- 9-11-14] Location = W-E S-N TVD(SBS) Top 671441.00 5975311.00 -65.00 Bottom 672017.46 5968512.12 8964.00 Note: Ail depths in feet Below Kelly Bushing (BKB) 7-JUL-1987 ---- Closest Approach Analysis --- Date: 7-JUL-87 Time: 08:33:43 08:33 Page WELL IDENT Closest Approach /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART A029-2101100 K-3 903.9 0.0 900.0 1.2 A029-2101400 K-2A 1203.4 0.0 1200.0 4.0 A029-2102300 K-4 2158.7 28.8 2154.8 10.3 SUMMARY The well which comes closest to the proposed well is: A029-2102300 K-4 Closest approach distance = 18.5 feet KICK OFF for this run = 1800.0 feet Vertical CLOSEST /PROPOSED~ DISTANCE TVD DEPART 187.6 71.3 18.5 Intersection /NEARBY% TVD DEPART VERTICAL DISTANCE $1$DUA10: [DRAN022.J40]K14 PROFILE.LIS;25 7-JUL-1987 Well= K-14 [23- 9-11-14] Directional Profile Course line DRAN022 / 7-JUL-87 /08:35:34 TVD BUILD COMPASS RIGHT MD (BKB) DEPART ANGLE RATE AZIMUTH TURN 0. 0. 0. 0.00 0.00 0.00 0.00 1800. 1800. 0. 0.00 2.50 176.47 0.00 3707. 3494. 748. 47.66 0.00 176.47 0.00 11601. 8811. 6584. 47.66 0.00 176.47 0.00 11925. 9029. 6823. 47.66 0.00 176.47 0.00 08:35 Page Well= K-14 [23- 9-11-14] Marker File DRAN022 / 7-JUL-87 /08:35:34 Label TVD TVD MD DEPART INC SS (BKB) ANGLE KOP #1 1735. 1800. 1800. 0. 0.00 BASE PERMAFROST 1850. 1915. 1915. 3. 2.88 13 3/8" SHOE 2615. 2680. 2703. 176. 22.58 END OF BUILD ~1 3429. 3494. 3706. 748. 47.66 NSCC X/O 4500. 4565. 5296. 1924. 47.66 TOP UGNU SANDS 4700. 4765. 5593. 2143. 47.66 BASE WEST SAK FORMATION 6400. 6465. 8117. 4009. 47.66 IKRU-PBU 7800. 7865. 10196. 5545. 47.66 PACKER 8093. 8158. 10631. 5867. 47.66 TOP 7" LINER 8127. 8192. 10682. 5904. 47.66 9 5/8" SHOE 8295. 8360. 10931. 6088. 47.66 12 1/4" HOLE 8298. 8363. 10935. 6092. 47.66 TOP SAG RIVER SANDSTONE 8302. 8367. 10941. 6096. 47.66 TOP SHUBLIK FORMATION 8350. 8415. 11013. 6149. 47.66 TOP SADLEROCHIT 8420. 8485. 11117. 6226. 47.66 CURRENT GOC 8640. 8705. 11443. 6467. 47.66 TARGET 8746. 8811. 11601. 6584. 47.66 KAVIK (BASE SADLER) 8897. 8962. 11825. 6750. 47.66 TOTAL DEPTH 8964. 9029. 11925. 6823. 47.66 ?l~-c TA~J~ TO pIT V,/AT6R TRIP TANK SAND ,," TYPE E'ER DISTRII~TION DI "r'c, / ., / / /' PIT - Choke .Manifold 1 - RecOrding drilling fluid pit 'level indicatOr with both visual and audio warning - Poor Boy Degasser~_. . ~ ' · Brandt Vacuum. Typ~.egas~..r ~6~ 1 devices at driller's console ' - Trip Tank (75 BBL.) , Brandt Dual Tandem ~mle~ak~ 1 - Drilling fluid flow sensor with readout at driller's console Pioneer Mud Cleaners~_ .-, //~ 11 - 5 Hp AgitatOrs Pioneer M]<I Centrifug~/~ % '-~ ' · o (8) (i4 rnru 22) (5) BO~:~- d/~.¢,~'~ e-~-~- " (2.3 c=u 28) ' (6) ~ /,~/__~... (29 r..bmz 31)" rev: 01/28/87 6.011 1. Is dna po~m!~ fee ar'~m_had ........................................... v,O ~ ,, 2'. Is ~ to be locaued in a ~d pool ............................. .3. T.s ~e~ loc. aced proper ~ s~ce ~ pr'ope=r7 iina .................. 4. IS well located p~ d~-~rance ~ or. her wells .., ................. 5. Is suffice undedicacad a~eag~ available in r_his pool 6. Is weI1 rm be deviated and .is we_l]bore p i au included ................ 7. Is operauor the only affecued parry ................................. 8. Can p~U be aooroved before fifu~-~ waiU ...................... 9. Does operaccz: have a bond in force .................................. ~x5 10. Is a conservauion ord~w needed ...................................... 1! Is adminis~uive appr. oval-needed ' 12. Is ube lease ~er .mpprop. ria=e ..................................... ~ 13. Does the ~ have a unique name and rmm~er .......................... v~ · · 14 Is conducuor surir~ provided ~' ~__ 15. Will surface casir~ procec~ fresh r,-a~er zones ....................... ,,/¢¢ 16. Is enotmjh cemenu used co circ~taue on cond~uor and sub-face ......... 17. W~!I cemsnu Uie iu re=face and inuemmediace or prodncuion sur~ ... 18. Will cemmnu cover all known prodncuive horizons ..................... 19. Will ~I'L cas~ give adaqua, ua safety in coL~. se, tension and burs~.. 20. Is ri%is ~ to be kicked off frcm an ~ suing wellbore ............ 21. Is old w~bore abandonmenu proce~e included on 10-403 ............ 22. Is adequate wellbore seoarauion, proposed ............................ For explorauory and S~-auigr-aphic w~!_l ~: 29. Are data presented on potenmLal mm_--prmssur~ zones? ................. 30. Are s~i~c ~m~lysis dare presented on shallc~ gas zanas .... . ........ 31. If an offshore loc., are survey resulr, s of s~_bed ccndi~Lcms pres enued ---- g%o/¢o. D~Y - I ~ o~u. S'5'O ii Lo KOI o~ · I i Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * * * * ....... SCHLUMBERGER ....... * * ............................ * ****************************** COMPANY NAME : BP EXPLORATION (ALASKA) INC WELL NAME : K-14 FIELD NA~E : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292175200 REFERENCE NO : 97590 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/01/ 2 ORIGIN : FLIC REEL NAME : 97590 CONTINUATION # : PREVIOUS REEL : COGENT : BP EXPLORATION, PRUDHOE BAY, K-14, API #50-029-21752-00 **** TAPE HEADER **** SERVICE NAFIE : EDIT DATE : 98/01/ 2 ORIGIN : FLIC TAPE NAME : 97590 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : BP EXPLORATION, PRUDHOE BAY, K-14, API #50-029-21752-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: K-14 API NUMBER: 500292175200 OPERATOR: BP EXPLORATION (ALASKA) INC LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 2-JAN-98 JOB NUMBER: 97590 LOGGING ENGINEER: S. DECKERT OPERATOR WITNESS: D. WENDT SURFACE LOCATION SECTION: 4 TOWNSHIP: 1 iN RANGE: 14E FNL: 1909 FSL: FEL: 4106 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 53.20 DERRICK FLOOR: 52.20 GROUND LEVEL: 24.30 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 9. 675 10827.0 47. O0 2ND STRING 7. 000 11800.0 26. O0 3RD STRING 4.500 10626.0 12.60 PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 88888.0 11733.0 11723.5 11719.0 11707.5 11702.5 11702.0 11700.5 11694.5 11677.5 11677.0 11667.5 11663.0 11661.5 11660.5 11647.0 11626.5 11625.0 11620.0 11612.0 11611.5 11601.0 11595.5 11593.5 11587.5 11587.0 11579.5 11579.0 11565.5 11559.5 11553.0 11540.5 11532.0 11531.5 11518.0 11517.0 11507.5 11502.0 11486.5 11485.5 11481.5 11481.0 11466.5 11466.0 11457.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD .............. 88888.0 88888.0 11707.5 11701.5 11695.0 11678.0 i1667.5 11664.5 11661.0 11647.5 11627.0 11625.5 11612.5 11603.0 11596.5 11592.0 11588.0 11578.0 11566.0 11561.0 11554.5 11541.5 11532.5 11519.0 11507.5 11502.0 11487.0 11481.5 11466.0 11457.5 11733.0 11723.5 11721.0 11708.0 11701.5 11698.5 11695.0 11678.0 11667.5 11664.5 11661 5 11647 5 11627 0 11625 5 11619 0 11613 0 11603.0 11596.5 11587.5 11578.0 11566.0 11561.0 11555.0 11541.5 11532.5 11519.5 11507.5 11502.0 11487.0 11481.0 11466.0 11457.5 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 11449.0 11449.0 11448.0 11448.5 11436.5 11437.0 11437.0 11424.5 11425.0 11424.0 11425.0 11421.0 11421.0 11421.0 11397.0 11397.0 11397.0 11385.0 11385.5 11385.5 11381.5 11383.0 11383.0 11379.0 11380.0 11380.0 11361.5 11362.5 11361.0 11362.0 11347.5 11347.5 11347.0 11347.5 11333.5 11334.5 11334.5 11328.5 11330.0 11328.0 11329.5 11320.0 11320.5 11320.5 11314.5 11314.5 11306.5 11307.5 11307.5 11303.5 11304.5 11304.5 11299.0 11300.0 11289.0 11290.0 11288.5 11290.0 11275.5 11276.5 11276.5 11272.0 11272.0 11271.0 11271.5 11245.0 11246.0 11246.0 11227.0 11227.0 11226.0 11227.0 11213.0 11212.0 11212.0 11206.0 11205.0 11186.0 11186.0 11185.0 11186.0 11173.5 11173.5 11172.5 11171.5 11154.0 11153.5 11153.5 11141.0 11142.5 11140.5 11142.5 11139.5 11140.0 11139.0 11140.0 11119.0 11120.0 11120.0 11106.0 11106.0 11106.0 11101.0 11101.5 11101.5 11097.5 11096.0 11093.0 11093.0 11081.0 11081.0 11076.5 11077.5 11077.5 11068.5 11069.0 11068.0 11069.0 11065.0 11066.0 11064.5 11066.0 11055.5 11056.5 11055.0 11056.5 11050.5 11050.0 11050.0 11050.0 2-JAN-1998 15:41 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 11047.0 11047.5 11044.0 11044.0 11044.0 11034.5 11033.0 11033.0 11022.0 11022.5 11022.5 11007.0 11007.0 11006.5 11007.5 11003.0 11003.0 10994.0 10994.0 10993.0 10993.5 10980.5 10981.5 10981.5 10978.0 10979.0 10977.5 10979.0 10973.0 10973.0 10963.5 10963.5 10962.0 10963.5 10955.0 10955.5 10955.5 10938.5 10938.0 10938.0 10924.5 10926.0 10926.0 10919.5 10920.5 10920.5 10898.0 10898.5 10898.5 10889.5 10889.5 10888.0 10889.0 10884.0 10885.5 10885.5 10875.5 10876.5 10876.5 10872.0 10873.0 10871.5 10873.0 10866.5 10868.0 10866.0 10868.0 10853.0 10854.0 10853.5 10832.0 10833.5 10833.0 10827.5 10826.5 10826.5 10813.5 10813.5 10813.5 10807.5 10809.5 100.0 100.0 102.0 $ REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE CNTD DATA AQUIRED ON BP EXPLORATION'S K-14 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN PASS #1 GRCH AND THE BCS GAM~A RAY, ALSO PASS #1 NPHI AND THE BCS GAF~IA RAY, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. NPHI COUNT FROM 10986'FID TO 10790'~ID IS AFFECTED BY GAS IN THE WELLBORE. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH ................................... GRCH 11721.0 10790.0 CNTD 11734.0 10792.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH .............. .......... EQUIVALENT UNSHIFTED DEPTH .......... GR CH CNTD .............. $ REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #1. THERE ARE NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT I1 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: ** SET TYPE ~ CHAN ** ....................................................................................... NAFIE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) ....................................................................................... DEPT FT 1064295 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-S 1064295 O0 000 O0 0 1 I 1 4 68 0000000000 NRAT CNTD 1064295 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 1064295 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTD CPS 1064295 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTD CPS 1064295 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 1064295 O0 000 O0 0 1 I 1 4 68 0000000000 CNTC CNTD CPS 1064295 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 1064295 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 1064295 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 1064295 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 11734.000 NPHI. CNTD 31.696 NRAT. CNTD 5.026 CRAT. CNTD NCNT. CNTD 3408.284 FCNT. CNTD 722.222 CFTC. CNTD 713.650 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1570.000 CCL. CNTD 0.000 DEPT. 10790.000 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 44.875 TENS. CNTD -999.250 CCL.CNTD -999.250 5.248 3638.188 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREFiENT : 0.5000 FILE SUF~4~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11721.0 10794.0 CNTD 11729.5 10795.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH .............. 88888.0 11728.0 11716.0 11709.0 11701.0 11700.5 11698.0 11694.5 11692.5 11687.0 11681.0 11677.5 11674.0 11673.5 11670.5 11663.5 11661.0 11658.0 11649.5 11649.0 11634.0 11629.5 11626.0 11621.0 11619.5 11617.5 11613.0 11609.5 11607.5 11606.5 11599.0 11597.5 11596.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD .............. 88888.0 88883.5 11723.5 11716.0 11707.0 11701.5 11698.5 11697.0 11694.0 11693.5 11689.5 11681.0 11678.0 11675.0 11674.5 11670.0 11664.0 11661.0 11661.5 11658.0 11649.5 11651.5 11635.5 11629.5 11627.0 11622.0 11619.0 11617.5 11614.0 11609.0 11606.0 11607.5 11599.5 11599.0 11596.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 11591.5 11587.0 11583.0 11573.5 11573.0 11571.0 11564 5 11561 5 11561 0 11559 0 11553 5 11552 5 11551 0 11532 5 11531 5 11529 0 11518 0 11513 5 11512 0 11510 0 11506 5 11505 5 11501 0 11491 5 11491 0 11481 5 11475 5 11465 5 11465 0 11458 0 11448 5 11445 5 11437 0 11436 5 11434 5 11428 0 11424 5 11416 5 11403 5 11398 0 11391 0 11390 0 11383 0 11382 5 11378 5 11373.5 11364.0 11362.0 11360.0 11350.0 11345.0 11344.5 11341.5 11334.5 11333.5 11592.0 11588.0 11583.0 11572.0 11568.5 11561.0 11554.5 11553.0 11532.5 11530.0 11518.5 11507.5 11502.0 11491.5 11481.5 11466.0 11448.5 11437.5 11425.0 11396.5 11390.0 11383.0 11380.0 11362.5 11346.5 11334.5 11573.5 11566.0 11562.5 11560.5 11554.5 11532.5 11529.0 11515.0 11512.5 11510.0 11506.0 11501.0 11491.5 11481.5 11475.0 11465.0 11458.0 11444.0 11436.5 11434.5 11428.5 11424.5 11416.5 11402.5 11391.0 11384.0 11378.5 11374.5 11364.5 11361.5 11350.0 11345.0 11341.5 11334.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 11330.0 11330.0 11320.5 11320.5 11319.0 11318.0 11312.5 11312.5 11312.0 11312.5 11309.0 11309.0 11308.0 11307.5 11305.0 11305.5 11304.0 11304.0 11300.5 11300.0 11290.0 11290.0 11290.5 11282.5 11283.0 11276.0 11278.0 11273.0 11272.0 11272.0 11272.0 11267.5 11267.5 11257.5 11257.5 11255.5 11255.5 11254.5 11254.0 11245.5 11246.0 11245.5 11230.5 11230.5 11227.0 11226.5 11226.5 11227.0 11223.0 11222.5 11218.0 11217.0 11212.0 11212.0 11206.5 11205.0 11199.5 11199.0 11192.0 11193.0 11189.5 11189.0 11186.0 11185.5 11185.0 11186.0 11182.5 11182.5 11166.0 11165.5 11158.5 11157.5 11147.0 11148.0 11143.0 11142.5 11139.0 11140.0 11131.5 11131.0 11127.5 11128.0 11119.5 11120.0 11119.0 11119.5 11108.0 11106.0 11104.5 11103.5 11098.0 11096.5 11086.5 11086.0 11080.5 11080.5 11076.5 11077.5 11068.5 11069.5 11067.0 11067.0 11065.5 11066.0 11061.5 11062.5 11060.0 11061.0 11057.0 11059.0 11056.0 11057.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 10 11055.5 11056.0 11051.0 11050.5 11049.5 11049.5 11047.5 11047.5 11046.5 11047.5 11043.5 11043.5 11041.0 11040.0 11031.5 11031.0 11027.0 11026.0 11025.5 11025.0 11022.5 11022.5 11022.0 11022.0 11016.5 11016.5 11006.5 11007.0 11006.0 11007.0 11004.0 11003.5 10997.5 10998.0 10997.0 10997.5 10985.5 10986.0 10984.0 10984.5 10983.0 10983.0 10980.5 10981.5 10977.5 10979.0 10965.5 10965.5 10964.0 10964.0 10962.5 10963.5 10955.5 10955.5 10955.0 10956.0 10950.0 10949.5 10943.5 10943.0 10941.5 10941.5 10935.0 10935.0 10915.5 10916.0 10914.5 10916.0 10907.0 10908.0 10905.5 10906.5 10897.0 10898.5 10896~5 10898.0 10891.5 10892.0 10889.0 10889.0 10888.0 10889.0 10885.0 10886.5 10884.0 10885.5 10878.0 10879.0 10876.5 10876.5 10871.5 10873.0 10872.0 10866.0 10868.0 10865.5 10867.5 10857.5 10858.5 10856.5 10857.0 10853.0 10854.0 10848.5 10849.5 10840.5 10840.5 10837.0 10838.5 10835.0 10836.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 11 10833.5 10832.0 10833.5 10818.0 10812.0 10813.5 10811.0 10803.0 10802.0 10802.0 100.0 100.0 $ 10834.5 10816.0 10809.5 10804.0 101.0 REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN PASS #2 GRCHAND PASS #1 GRCH, ALSO PASS #2 NPHIAND PASS #1 NPHI, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. THE NPHI COUNT FROM 10982'MD TO 10790'~D IS AFFECTED BY GAS IN THE WELLBORE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1064295 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 1064295 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 1064295 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 12 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) CRAT CNTD 1064295 O0 000 O0 0 2 1 1 NCNT CNTD CPS 1064295 O0 000 O0 0 2 1 1 FCNT CNTD CPS 1064295 O0 000 O0 0 2 1 1 CFTC CNTD CPS 1064295 O0 000 O0 0 2 1 1 CNTC CNTD CPS 1064295 O0 000 O0 0 2 1 1 GRCH CNTD GAPI 1064295 O0 000 O0 0 2 1 1 TENS CNTD LB 1064295 O0 000 O0 0 2 1 1 CCL CNTD V 1064295 O0 000 O0 0 2 1 1 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 ** DATA ** DEPT. 11729.500 NPHI.CNTD 32.687 NRAT. CNTD 5.128 CRAT. CNTD 5.365 NCNT. CNTD 3673.373 FCNT. CNTD 722.222 CFTC. CNTD 719.617 CNTC. CNTD 3822.925 GRCH. CNTD -999.250 TENS. CNTD 1570.000 CCL.CNTD 0.000 DEPT. 10794.000 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD -999.250 NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD -999.250 GRCH. CNTD 52.375 TENS. CNTD -999.250 CCL.CNTD -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: EDITED CURVES LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 13 Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11721.5 10792.0 CNTD 11730.0 10792.0 $ CURVE SHIFT DATA - PASS TO PASS (FIEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH CNTD ............................ 88888.0 88888.5 88884.0 11728.0 11724.0 11715.0 11715.5 11709.0 11708.5 11707.0 11701.5 11701.5 11700.0 11698.5 11695.5 11695.0 11695.0 11695.0 11692.5 11693 . 5 11689.5 11691.5 11687.0 11688.5 11687.0 11680.5 11681.5 11677.0 11677.5 11673.0 11674.5 11671.5 11671.5 11665.5 11666.0 11664 . 0 11665.5 11661.0 11661.5 11660.5 11660.5 11658.5 11658.5 11652.0 11653.0 11650.0 11650.0 11647.0 11647.5 11639.5 11640.0 11639.0 11638.5 11633.0 11633.0 11627.0 11627.0 11626.0 11627.0 11621 . 0 11622 . 0 11620.5 11619.0 11618.0 11618.5 11613.5 11614.5 11613.0 11614.0 11607.0 11607.5 11606.0 11607.5 11602.5 11605.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 14 11601.5 11603.0 11600.0 11600.0 11597.5 11599.0 11596.0 11596.5 11593.0 11592.5 11587.5 11587.5 11587.0 11588.0 11581.0 11581.0 11578.0 11579.5 11573.5 11573.0 11572.5 11572.0 11569.0 11569.0 11565.5 11565.5 11560.0 11561.0 11554.5 11556.5 11554.0 11555.0 11551.0 11552.5 11541.0 11541.5 11533.0 11533.0 11531.5 11532.5 11527.5 11527.5 11522.0 11524.0 11518.5 11518.5 11511.5 11512.5 11510.0 11510.5 11508.0 11507.5 11505.0 11506.5 11501.5 11501.0 11496.0 11496.0 11491.5 11491.5 11483.5 11484.0 11480.5 11481.0 11480.0 11480.0 11476.0 11475.5 11471.5 11472.0 11466.0 11466.0 11465.5 11465.5 11458.5 11459.0 11453.5 11453.5 11451.0 11450.0 11448.0 11448.5 11444.0 11443.5 11437.5 11437.5 11434.5 11435.0 11429.0 11428.5 11428.5 11428.5 11424.5 11425.0 11424.0 11425.0 11421.0 11421.0 11416.5 11416.0 11409.5 11409.5 11404.5 11404.5 11402.5 11402.5 11398.5 11398.0 11397.0 11397.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 15 11391 5 11390 5 11383 0 11382 5 11379 5 11379 0 11373 5 11366.5 11364.0 11361.5 11359.5 11350.5 11346.5 11346.0 11334.5 11333.5 11322.5 11321.0 11319.0 11312.5 11309.0 11307.0 11305.5 11304.5 11300.0 11292.5 11292.0 11290.0 11283.0 11281.5 11280.5 11279 0 11273 0 11272 5 11264 5 11264 0 11249 5 11246.0 11241 5 11231 0 11227 5 11227 0 11221 5 11218 5 11211 5 11207 0 11203 5 11200 5 11190 5 11188 0 11186 5 11186 0 11183.5 11182.0 11172.5 11390.0 11383.0 11380.0 11366.5 11362.5 11351.5 11347.5 11334.5 11321.0 11318.0 11307.5 11304.5 11300.0 11293.5 11290.0 11281.0 11278.5 11272.0 11266.0 11246.0 11227.0 11222.5 11211.0 11199.0 11192.5 11189.0 11186.0 11183.0 11172.0 11391.0 11384.0 11379.0 11373.0 11365.0 11361.0 11345.5 11334.5 11321.0 11312.5 11309.5 11305.0 11293.5 11290.5 11283.5 11282.0 11273.0 11265.0 11250.5 11245.5 11241.5 11230.5 11227.0 11218.0 11205.5 11202.0 11186.0 11183.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 16 11164.5 11163.0 11159.5 11161.0 11152.0 11153.0 11142.5 11142.5 11138.5 11140.0 11130.0 11130.5 11124.0 11125.0 11119.5 11120.5 11119.0 11120.0 11102.5 11105.0 11089.0 11091.5 11083.0 11086.5 11080.0 11080.0 11077.5 11078.0 11076.5 11077.5 11075.0 11074.5 11072.5 11073.5 11066.5 11067.5 11065.0 11066.0 11061.0 11059.0 11060.5 11061.0 11057.5 11059.5 11056.5 11056.5 11055.0 11047.5 11047.5 11047.0 11047.0 11044.0 11044.0 11042.0 11041.5 11039.5 11039.5 11034.5 11033.0 11031.0 11031.0 11024.5 11025.0 11022.0 11022.0 11021.5 11022.0 11016.0 11018.0 11012.0 11013.0 11011.0 11010.5 11007.0 11007.0 11006.0 11007.0 11003.5 11003.5 10997.5 10998.0 10986.0 10986.5 10984.0 10984.5 10983.5 10983.0 10981.0 10981.5 10975.0 10975.0 10973.5 10973.0 10966.0 10966.0 10963.5 10964.0 10962.5 10963.5 10955.5 10955.0 10955.5 10947.5 10947.0 10941.5 10941.5 10940.0 10941.0 10926.5 10927.5 10926.0 10926.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 17 10920.5 10920.5 10907.5 10907.5 10906.0 10906.0 10898.5 10898.5 10888.5 10889.0 10885.5 10886.5 10885.0 10885.5 10883.0 10884.0 10878.5 10878.5 10879.0 10877.0 10877.0 10871.5 10873.0 10870.0 10870.5 10867.0 10868.0 10858.5 10858.5 10856.5 10857.0 10851.5 10853.5 10851.0 10846.5 10849.0 10837.0 10839.0 10834.5 10836.0 10833.0 10834.0 10832.0 10833.5 10823.5 10822.5 10820.0 10821.5 10817.5 10817.5 10812.5 10813.5 10805.0 10806.5 10804.0 10804.0 10801.5 10801.5 10796.0 10796.0 100.0 100.0 100.0 $ REM~ARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN PASS #3 GRCH AND PASS #1 GRCH, ALSO PASS #3 NPHI AND PASS #1 NPHI, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. THE NPHI COUNT FROM 10982'MD TO 10790'MD IS AFFECTED BY GAS IN THE WELLBORE. $ $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 18 TYPE REPR CODE VALUE 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTD CPS 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTD CPS 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 1064295 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 11730.000 NPHI. CNTD 31.950 NRAT. CNTD 5.077 CRAT. CNTD NCNT. CNTD 3592.592 FCNT. CNTD 722.222 CFTC. CNTD 731.967 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1555.000 CCL.CNTD 0.000 DEPT. 10792.000 NPHI. CNTD 18.448 NRAT. CNTD 3.333 CRAT. CNTD NCNT. CNTD 6900.474 FCNT. CNTD 2033.898 CFTC. CNTD 2025.460 CNTC. CNTD GRCH. CNTD 42.875 TENS. CNTD 1555.000 CCL.CNTD 0.000 5.278 3754.378 3.544 7002.933 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-I998 15:41 PAGE: 19 **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT O. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS .......................... 1, 2, 3, CNTD REMARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE FOR PASSES 1,2, &3. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. THE NPHI AVERAGE IS AFFECTED BY GAS IN THE WELLBORE FROM 10982'~D TO THE TOP OF THE LOGGING INTERVAL. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 40 4 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 2O TYPE REPR CODE VALUE 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 1064295 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 11734.000 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV GRCH. CNTD -999.250 TENS. CNTD 1570.000 DEPT. 10790.000 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV GRCH. CNTD 44.875 TENS. CNTD -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 21 **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMFiARY VENDOR TOOL CODE START DEPTH ........................... CNTD 11760.0 $ LOG HEADER DATA STOP DEPTH .......... 10787.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAIViMA RAY CNTD COMPENSATED NUETRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) 22-JUL-97 CP 42.2 1103 22-JUL-97 11736.0 10737.0 10800.0 11734.0 1800.0 TOOL NUMBER ATTC 708 CNTD 101 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 22 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 11800.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEA WATER NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHCS DATED 9-26-87. LOGGED WITH SANDSTONE MATRIX. FLUID PACKED WITH 185 BBLS. GAS IN WELLBORE NOTED ON MAIN PASSES. THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 44 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 23 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE ~ CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 1064295 O0 000 O0 0 5 i 1 4 68 0000000000 TNRA PS1 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 RCNTPS1 CPS 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 1064295 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 11760.000 NPHI.PS1 31.897 RTNR.PS1 4.973 TNRA.PS1 RCNT. PS1 3648.079 RCFT. PS1 733.581 CNTC. PS1 3825.507 CFTC. PSi GR.PS1 72.500 TENS.PSI 835.000 CCL.PS1 0.000 DEPT. 10787.000 NPHI.PS1 18.052 RTNR.PS1 3.107 TNRA.PS1 RCNT. PS1 6206.061 RCFT. PS1 1995.157 CNTC. PS1 6530.070 CFTC. PSI GR.PS1 42.906 TENS. PSi 1585.000 CCL.PS1 0.000 5. 272 725.636 3. 491 1884.978 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 24 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAFIE : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUmmARY VENDOR TOOL CODE START DEPTH ........................... CNTD LOG HEADER DATA DATE LOGGED: 11756.0 SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 10794.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GA~M_A RAY CNTD COMPENSATED NUETRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 22-JUL-97 CP 42.2 1103 22-JUL-97 11736.0 10737.0 10800.0 11734.0 1800.0 TOOL NUMBER ........... ATTC 708 CNTD 101 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 25 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 11800.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM): FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEA WATER NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHCS DATED 9-26-87. LOGGED WITH SANDSTONE MATRIX. FLUID PACKED WITH 185 BBLS. GAS IN WELLBORE NOTED ON MAIN PASSES. THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 26 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~I CODE (HEX) O0 000 O0 0 6 1 1 4 68 0000000000 DEPT FT 1064295 NPHI PS2 PU 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS2 CPS 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 1064295 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 11755.000 NPHI.PS2 31.415 RTNR.PS2 4.919 TNRA. PS2 RCNT. PS2 3700.127 RCFT. PS2 752.224 CNTC. PS2 3880.086 CFTC. PS2 GR.PS2 82.813 TENS.PS2 905.000 CCL.PS2 0.000 DEPT. 10793.000 NPHI.PS2 18.413 RTNR.PS2 3.219 TNRA.PS2 RCNT. PS2 6857.143 RCFT. PS2 1990.521 CNTC. PS2 7032.876 CFTC. PS2 GR.PS2 47.750 TENS. PS2 1565.000 CCL.PS2 0.000 5.215 744. 076 3. 539 1957. 323 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 27 **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : 001 CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUFkrlARY VENDOR TOOL CODE START DEPTH STOP DEPTH ..................................... 11758.0 10792.0 CNTD LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO) TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAF~VIA RAY CNTD COMPENSATED NUETRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 22-JUL-97 CP 42.2 1103 22-JUL-97 11736.0 10737.0 1O800.0 11734.0 1800.0 TOOL NUMBER ........... ATTC 708 CNTD 101 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 28 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 11800.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM I~OLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEA WATER NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHCS DATED 9-26-87. LOGGED WITH SANDSTONE MATRIX. FLUID PACKED WITH 185 BBLS. GAS IN WELLBORE NOTED ON MAIN PASSES. THIS FILE CONTAINS THE RAW DATA FOR PASS #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 29 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELTO4 CODE (HEX) DEPT FT 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 RCNTPS3 CPS 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 1064295 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 11758.000 NPHI.PS3 32.381 RTNR.PS3 5.027 TNRA.PS3 RCNT. PS3 3602.905 RCFT. PS3 716.707 CNTC. PS3 3778.136 CFTC. PS3 GR.PS3 62.750 TENS.PS3 930.000 CCL.PS3 0.000 DEPT. 10792.000 NPHI.PS3 18.448 RTNR.PS3 3.333 TNRA.PS3 RCNT. PS3 6900.474 RCFT. PS3 2033.898 CNTC. PS3 7002.933 CFTC. PS3 GR.PS3 42.875 TENS. PS3 1555.000 CCL.PS3 0.000 5.329 708.944 3.544 2025.460 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 2-JAN-1998 15:41 PAGE: 3O **** FILE TRAILER **** FILE NAIVlE : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/01/ 2 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/01/ 2 ORIGIN : FLIC TAPE NAME : 97590 CONTINUATION # : 1 PREVIOUS TAPE : COIVlMENT : BP EXPLORATION, PRUDHOE BAY, K-14, API #50-029-21752-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/01/ 2 ORIGIN : FLIC REEL NAME : 97590 CONTINUATION # : PREVIOUS REEL : COf4~ENT : BP EXPLORATION, PRUDHOE BAY, K-14, API #50-029-21752-00 RECEIVED ~BL 0 ~ 1~ Alask~ Oil ~s K- 14 PRUDHOE BAY commission III Run 1: 18 - June - 1995 CN/GR Cased Hole 10790 1728 WESTERN Logging Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD K - 14 500292175200 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 26-JUN-95 6447.01 K. RICHARDS K. COYNE 4 liN 14E 1909 4106 53.22 0.00 25.62 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL pASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 13.375 2719.0 72.00 9.625 10827.0 47.00 7.000 11800.0 26.00 4.500 10622.0 12.60 BASELINE DEPTH 10857.0 10860.5 10863.0 10863.5 10883.5 10884.5 10886.0 10898.5 10948.5 10949.5 10962.0 10971.5 10974.0 EQUIVALENT UNSHIFTED DEPTH PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: GRCH 10858.5 10861.0 10863.5 10864.5 10884.5 10885.0 10887.0 10899.0 10950.5 10951.0 10963.5 10972.0 10974.5 BHCS GR 2 1 10-SEP-87 SWS NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM OFF, CALIPER & CASING CORRECTED, SALINITY = 0.0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. / ? ?MATCH1A. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH 10790.0 10800.0 BASELINE DEPTH NPHI 10836.0 10835.5 10847.5 10848.5 10857.0 10858.5 10860.5 10861.5 10863.0 10863.5 10863.5 10864.5 10880.0 10880.5 10883.5 10884.5 10884.5 10885.0 10885.5 10886.5 10898.5 10899.0 10948.5 10950.5 10949.5 10951.0 10956.0 10956.5 10963.0 10963.5 10971.5 10972.0 10974.0 10974.5 10974.5 10975.5 10977.5 10978.5 10984.5 10984.5 10987.0 10987.5 11001.0 11001.5 11011.5 11012.0 11012.5 11012.5 11017.0 11017.5 11022.0 11022.0 11032.5 11033.5 11043.5 11044.0 11047.0 11047.0 11050.0 11050.5 11064.0 11065.0 11069.0 11069.0 11180.5 11181.0 11181.5 11181.5 11227.0 11226.5 11291.5 11291.5 11298.0 11297.5 11298,5 11298,5 11304.0 11303.5 STOP DEPTH 11718.0 11728.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 11307.0 11320.5 11326.5 11334.5 11346.5 11363.5 11364.5 11368.0 11377.5 11383.0 11389.0 11391.5 11392.0 11402.5 11419.5 11505.0 11516.0 11537.0 11546.0 11555.5 11587.5 11596.0 11602.5 11622.5 11626.5 11631.5 11656.0 11661.0 11665.5 11683.5 11692.5 11700.0 11707.5 $ REMARKS: 11307.0 11320.5 11326.0 11333.5 11345.5 11363.0 11363.5 11367.0 11377.0 11382.0 11388.5 11391.0 11392.0 11402.5 11419.0 11504.5 11515.0 11536.0 11545.0 11554.0 11586.0 11595.0 11600.5 11621.5 11626.0 11631.0 11655.0 11660.0 11665.5 11683.0 11691.5 11699.0 11706.0 PASS 1. FUCT & NUCT WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ? ?MATCH1B . OUT $ CN : BP EXPLORATION WN : K - 14 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units (ALASKA) Size API API API API Log Crv Crv Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 * DATA RECORD (TYPE# 0) Total Data Records: 40 1006 BYTES * Tape File Start Depth = 11760.000000 Tape File End Depth = 10770.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9906 datums Tape Subfile: 2 283 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes 4 42 995 99 4 42 995 99 4 42 995 99 4 42 995 99 16 Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH 10790.0 10800.0 BASELINE DEPTH GRCH 10794.0 10794.0 10836.5 10838.5 10837.5 10839.5 10847.5 10849.0 10850.5 10853.0 10853.5 10854.5 10864.0 10869.0 10870.0 10873.0 10876.5 10878.0 10880.0 10884.0 10885.0 10885.5 10887.0 10887.0 10887.5 10888.5 10891.0 10894.5 10896.0 10895.0 10897.0 10932.0 10933.5 10947.0 10949.0 10949.5 10951.5 10952.5 10956.0 10956.5 10958.0 10962.0 10963.0 10963.5 10978.5 10980.5 10979.5 10981.0 10982.5 10983.0 10984.0 10984.5 STOP DEPTH 11718.0 11728.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 10849.0 10854.5 10855.0 10855.5 10865.5 10870.0 10870.5 10875.5 10878.0 10881.5 10888.0 10888.5 10889.0 10891.5 10953.5 10957.0 10958.0 10959.5 10962.5 10963.0 10963.5 10980.0 10985.0 10995.5 11000.0 11007.0 11010.5 11017.0 11017.5 11018.5 11025.5 11027.5 11028.5 11038.0 11038.5 11046.0 11049.0 11049.5 11052.5 11067.5 11068.5 11074.0 11076.5 11081.0 11150.0 11157.0 11161.0 11180.5 11181.0 11182.0 11190.0 11219.0 11230.0 11230.5 11232.0 11233.0 11234.5 11235.5 11238.0 11248.0 11260.5 11263.0 11265.0 11268.5 11269.0 11269.5 11272.0 11272.5 11275.5 11276.0 11276.5 11280.5 11287.0 11287.5 11288.5 11290.0 11291.0 11297.0 11299.0 11300.0 11304.5 11307.5 11314.5 11007.5 11027.0 11028.5 11040.0 11048.0 11068.5 11074.5 11082.0 11181.0 11232.5 11233.0 11269.5 11270.0 11272.0 11273.0 11276.5 11281.5 11288.0 11291.0 11291.5 11298.0 11299.5 11304.5 11308.0 11315.0 10996.0 11001.0 11011.5 11017.5 11018.0 11018.5 11028.5 11038.0 11039.0 11049.5 11050.5 11053.5 11069.0 11076.5 11151.5 11158.0 11161.5 11181.5 11182.0 11190.0 11218.5 11229.5 11230.5 11234.5 11235.0 11237.5 11248.5 11261.0 11264.0 11266.0 11269.5 11275.5 11276.5 11288.0 11288.5 11300.0 11317 · 0 11317 · 0 11317.5 11318.0 11319.0 11319.0 11321.5 11321.0 11326.5 11327.0 11327.5 11328.0 11328.5 11328.5 11329.5 11329.0 11330.5 11330.5 11333.5 11333.5 11336.0 11335.5 11337.0 11336.0 11350.0 11351.5 11349 · 0 11350.5 11352.0 11351.0 11350.5 11351.5 11352.5 11353.5 11353.0 11354.0 11354.0 11354.5 11355.0 11355.0 11356.0 11355.5 11356.0 11356.5 11356.5 11360.5 11360.5 11363.0 11363.0 11365.0 11364.0 11369.5 11369.0 11376.5 11376 · 5 11377 · 0 11376.5 11377.5 11377.0 11378.0 11378 · 0 11377 · 0 11386.0 11385.0 11386.5 11386.0 11389.0 11388.5 11389.5 11389.5 11391.5 11391.5 11411.0 11410.0 11415.0 11414 · 0 11417.5 11417.0 11438.5 11438.0 11441.5 11441.5 11450.0 11448.5 11450.5 11450.5 11466.0 11465.5 11467.0 11466.5 11469.5 11469 · 5 11474 . 0 11474 · 0 11502.0 11502.5 11502.5 11503.0 11519.5 11518.5 11522 · 5 11521.5 11523 · 5 11524 · 0 11524.5 11525.0 11525.5 11525.0 11525.5 11526.5 11526.0 11530.5 11530.0 11537 · 5 11537 · 0 11549.5 11548.5 11550.5 11549.5 11561,0 11560,0 11561.5 11560.5 11586.0 11588.0 11588.5 11590.5 11596.5 11607.5 11613.5 11616.0 11619.0 11622.5 11626.5 11654.5 11655.0 11656.0 11657.0 11671.5 11672.5 11673.5 11674.0 11678.0 11683.0 11689.5 11696.0 11696.5 11697.5 11702.0 11707.0 11713.0 11723.5 $ REMARKS: PASS FUCT 11585 .5 11588.0 11590.5 11596.0 11607.0 11612.5 11615.5 11621. 11626. 11655. 11655. 11656. 11671.5 11672.0 11673.0 11674.0 11677.5 11683.0 11688.0 11695.5 11696.5 11697.5 11701.5 11713.5 11587.0 11617.5 11656.5 11706.5 11723.0 e & NUCT WERE SHIFTED WITH NPHI. /??MATCH2A.OUT /??MATCH2B.OUT $ CN : BP EXPLORATION WN : K - 14 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units GRCH 2418 68 1 GAPI NPHI 2418 68 1 PU-S FUCT 2418 68 1 CPS (ALASKA) Size API API API API Log Crv Crv Length Typ Typ Cls Mod 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 NUCT 2418 68 1 CPS 4 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 40 4 42 995 99 16 Tape File Start Depth = 11760.000000 Tape File End Depth = 10770.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9906 datums Tape Subfile: 3 260 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH 10790.0 10800.0 BASELINE DEPTH GRCH 10794.0 10794.0 10836.5 10838.5 10837.5 10839.5 10849.0 10850.5 10853.0 10853.5 10864.0 10867.5 10869.5 10878.5 10890.0 10893.5 10894.5 10896.0 10895.0 10897.0 10900.0 10921.5 10947.0 10949.0 10949.5 10951.5 10950.5 10958.5 10959.5 10962.0 10964.5 10978.0 10978.5 10980.5 10980.0 10981.0 10982.5 10983.5 10984.5 10989.0 10989.5 10990.0 11000.0 11002.0 11003.0 11011.5 11012.0 STOP DEPTH 11718.0 11728.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH ......... NPHI 10853.5 10854.0 10866.0 10869.0 10871.0 10880.0 10891.0 10894.0 10901.0 10923.0 10951.5 10952.0 10960.0 10960.5 10962.5 10965.0 10979.5 10980.0 10981.0 10984.5 10985.0 10989.5 10990.5 10991.0 11001.5 11003.5 11004.0 11012.5 11013.5 11012.5 11015.5 11025.5 11026.5 11027.0 11027.5 11028.5 11033.5 11034.0 11038.0 11044.0 11046.0 11046.5 11051.0 11056.0 11057.0 11063.5 11067.0 11067.5 11071.0 11074.0 11081.0 11102.5 11111.0 11111.5 11112.0 11114.0 11114.5 11117.0 11120.0 11120.5 11132.5 11150.0 11153.0 11154.0 11158.5 11178.5 11180.5 11181.0 11182.0 11189.5 11190.0 11191.0 11221.0 11222.5 11223.0 11227.0 11231.0 11231.5 11232.0 11233.0 11236.0 11241.0 11252.5 11253.0 11255.0 11260.5 11268.5 11269.0 11269.5 11027.0 11028.5 11040.0 11048.0 11065.0 11068.5 11072.0 11074.5 11082.0 11120.5 11181.0 11232.5 11233.0 11269.5 11270.0 11014.0 11016.0 11027.0 11028.0 11028.5 11029.0 11034.0 11035.0 11045.0 11047.0 11052.5 11056.5 11057.0 11067.5 11103.0 11110.5 11111.0 11112.0 11114.0 11115.0 11117.5 11121.5 11133.5 11151.5 11154.5 11155.0 11159.5 11179.0 11181.5 11182.0 11189.5 11190.5 11191.5 11220.5 11222.0 11223.0 11227.5 11231.5 11232.5 11233.0 11236.5 11241.5 11254.0 11254.5 11256.0 11260.0 11270.0 11272.0 11272.5 11276.5 11277.5 11278.0 11279.0 11280.0 11280.5 11283.5 11285.0 11286.5 11287.0 11289.0 11290.0 11290.5 11293.0 11294.0 11297.0 11299.0 11300.5 11312.5 11313.5 11314.5 11316.5 11317.0 11319.0 11321.5 11326.5 11327.0 11329.5 11330.5 11332.5 11333.5 11339.0 11340.0 11350.0 11350.5 11351.5 11353.5 11354.0 11354.5 11355.0 11356.0 11358.5 11360.5 11363.0 11365.5 11367.0 11376.5 11377.0 11377.5 11378.0 11386.5 11387.0 11392.0 11409.0 11409.5 11410.5 ~438.5 11442.5 11272.0 11273.0 11278.5 11281.5 11285.5 11287.0 11288.0 11291.0 11298.0 11299.5 11315.0 11319.0 11321.0 11327.0 11330.0 11330.~5 11333.5 11351.5 11352.0 11352.5 11356.0 11360.5 11376.5 11377.0 11378.0 11277.0 11277.5 11279.0 11280.5 11284.0 11287.0 11288.0 11290.0 11290.5 11293.5 11294.0 11301.0 11313.0 11313.5 11316.5 11317.5 11327.5 11332.5 11333.0 11338.5 11339.0 11352.5 11353.5 11355.0 11356.5 11358.5 11363.0 11364.5 11366.0 11376.5 11386.0 11387.0 11392.0 11409.5 11410.0 11410.5 11438.5 11443.0 .443.0 443.5 448.0 449.0 450.5 472.5 .475.0 486.0 488.5 502.0 502.5 519.5 .522.5 .525.5 530.5 537.5 549.5 550.5 586.0 ~588.5 .590.5 .601.0 ~602.0 _602.5 _608.0 .616.0 .618.5 .626.5 .640.5 .643.0 .654.5 _655.0 _656.0 .659.5 _661.0 ~664.0 .673.5 _674.0 _683.0 .696.0 =696.5 1697.5 1699.0 1703.5 1707.5 1713.5 1717.0 11450.5 11502.5 11503.0 11518.5 11521.5 11525.0 11537.0 11548.5 11549.5 11585.5 11588.0 11590.5 11601.0 11601.5 11602.5 11608.0 11615.5 11626.0 11655.0 11655.5 11656.0 11673.0 11674.0 11683.0 11695.5 11696.5 11697.5 11713.0 11443.5 11444.5 11448.5 11449.0 11474.0 11476.5 11486.0 11488.5 11530.5 11601.0 11618.0 11641.5 11644.0 11659.5 11661.0 11663.5 11698.5 11703.0 11707.5 11716.5 CN WN FN PASS 3. FUCT & NUCT WERE SHIFTED WITH NPHI. / ? ?MATCH3A. OUT / ? ?MATCH3B. OUT $ : BP EXPLORATION : K - 14 : PRUDHOE BAY (ALASKA) Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: CN WN FN COUN STAT 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3 PASSES. $ : BP EXPLORATION (ALASKA) : K - 14 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-S 4 3 FUCT CNAV 68 1 CPS 4 4 NUCT CNAV 68 1 CPS 4 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 40 Tape File Start Depth = 11760.000000 Tape File End Depth = 10770.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19812 datums Tape Subfile: 5 63 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10782.0 2418 10792.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 11744.0 11754.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 18-JUN-19 FSYS REV. J001 VER. 1.1 1730 18-JUN-19 11756.0 11730.0 10800.0 11728.0 1200.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA 0.000 11800.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 1150.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) :K-14 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 141 Tape File Start Depth = 11758.000000 Tape File End Depth = 10774.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 55246 datums Tape Subfile: 6 216 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10784.0 2418 10794.0 $ LOG HEADER DATA STOP DEPTH 11743.0 11753.5 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ 18-JUN-19 FSYS REV. J001 VER. 1.1 1833 18-JUN-19 11756.0 11730.0 10800.0 11728.0 1200.0 YES TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 11800.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 1150.0 0.000 O.0O0 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : K - 14 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/M/q 4 8 TEN 2418 68 1 LB 4 4 42 310 O1 1 4 42 995 99 1 4 42 890 01 1 4 42 334~31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 141 Tape File Start Depth = 11757.000000 Tape File End Depth = 10773.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 55246 datums Tape Subfile: 7 216 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10779.5 2418 10790.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 11744.5 11755.0 18-JUN-19 FSYS REV. J001 VER. 1.1 1937 18-JUN-19 11756.0 11730.0 10800.0 11728.0 1200.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SUB PCM PCM/CCL GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 3913NA 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 11800.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 1150.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 50 NEAR COUNT RATE HIGH SCALE (CPS): 1050 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 3. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : K - 14 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 8 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 32 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 141 Tape File Start Depth = 11759.000000 Tape File End Depth = 10774.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 90716 datums Tape Subfile: 8 216 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 9 is type: LIS 95/ 6/26 01 **** REEL TRAILER **** 95/ 6/26 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 26 JUN 95 12:41p Elapsed execution time = 9.56 seconds. SYSTEM RETURN CODE = 0 LOGGING COMPUTER PROCESSED ANALYSIS Cc, rapanl~,, STAHDARD ALASKA F.'RODUC'T'ZOH CCt, b~ll l< 't4 O,-'H AP.~ HUM; 50 .... n':.'"-]-21752 Fie. id PRUI}HOE BAY BATE OF JOB,' Count,.~ HORTH SLOPE S t .a t e: A L A S K A Count. r.:¢ USA CL I ENT FORMAT DATA TAPE LOG I NF ORblA T ! ON S T ANDARD F ORMA T ( L , I AP Z NUH: 5 O- 029-;2 i -~ ~ '-',. ..: ,=: Fi e: I d: PRUDHOE Bi~Y DA]"E OF JOB i 09-'.26-87 T~PE RECORDS Pr'evious r.e~;i ~ Page 2. Cc, ntinuatic, n ~: O~ S~-r. vicc nam.~z: :~.:GSF O~ Pr. evious %ape~ - D a t e: 8 7/" 0 '.~ ; '~ 2 ':~.0 r- i g i n: , .. p ,:. n a m e: ,.~ ,... 6 6 :% C o n t i n u .:a i; .'i o n ¢$ 0 'i File name: ~(15FOi , 001 Ha>::imum ienq=~:.n:' i024 Date: Fite tppe: L.O Previous: -f'ii,~:: M N E M CN WN FN C O U N STAT CTR:'/ SECT TOi.,jN RANG.' EK8 EDF EGL PD LMF DMF RUN LCC SON LUii FL LUL ENGi Yi TN TL! ~Li TCS TLAB ~HT MR T MT MVIS RMF MFST MFSS RMC MCST MCSS f' .- -3 p ":, 'r-, i NFORMAT I L N RE ..L, RCS .'.: O N T E i'-! T S ,U N I T T Y P E C R T G S ! Z E C: 0 [:, E STANDARD ALASKA PRODLtCTZON C'O ................. i<-i4 O/'H APi NUbi; 50--0;29 .... 2i75;2 ................ , PF.:U[:'HOE BAY D,ATE OF -JOB: 09-26-,S';' ................ NO R't"H SL. OF'E ALASKA .................................... US A i iN ..................................................... i4E ..................................................... 5._-.4,2 00 ................ - ................................. FT 52,200 .................................................. FT 24,3 00 .................................................. F T KB ....................... .~'37,., ..,64 , .............................................. , '7612 NORTH SLOPE .................................... NORTH SLOPE ROE[:,ER ..................................... C: U N N i N G H A i i SOO, OOO ............................................... FT ii8~4, OOO ' FT i OOOO, 000 , ....... FT i i8i O, OOO ............................................... FT 0 ~OO HR 9,5 0 0 ................................................... H R t~-° 000 DEGF i 78, O00 ................................................. DEGF DSP SOLTEN .................................... FLOWL Z I',tE .................................... ,..o, OOO .................................................. i, ,5i0 ................................................... 71 , 800 .................................................. bIERS 2,560 ............................................. , ..... 75,200 MEAS ............................................. CP OHi"iM OHMM L r..1SF O H M M DEGF o 0 0 0 '0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '0 0 0 0 F' ..-:~ g e 4 C 0 H H E N T R E C: iD R D ~i N E i'i S E P.. V I C E U H I T H N E H S E R V t C E ij N i T DEF'TH FEET DEPT FT TEN D iL. BHC LBS TENS DiL. BHC: LBS SP DIL. BHC AP! SP Dii_BHC APl ~R DILBHC GAF'i GR DiLBHC ~]APi i LD D ILBHC OHMH iLD [:,iLBHC: OHHH iLH DIL. SHC: OHMM ILH D!LSHC OHHH L!_J~ DILBHC OHMM LLA DiLBHC OHHH [:,T DiLBHC US/F DT DiLSHC L".=.,' ..... h C:ILD DiLBHC HHHO C:ILD DILBHC HHHO ENTRY BLOCK LEGEND :+: :'f-: :'~ :44 :.A. :,I': :~ :,i': :~ :¢ $ :+: :'t': :i': :.I': W. :~ TYPE [:,ESCR I PT i Of..i F: OR H H "'"' 7' '?' F-. . oF' EU 1 F i ,... A T i OHS T Y P E $ i Z E C 0 t) E 0 i 6 6 DP. TN FORMF T .... iF i C:AT ION® +.' :+' :e: ,*. D A T U i'i S P E C i F i C ~ T i 0 N 8 i_ 0 C K S * :~- :~ =~. ::.~t:N,~ i CE SER9 i CE MNEH ID ORDER ~ APl APl APl AP:.[ F ]: L.E UNIT LOG TYPE CLASS HOD -~ [:, E P T -¢. ..... · .... 4 T E N S D t' '"" '" ,' ...~ b ~: 4 b c, H ,_. '7" ..... ' '"" · SP DiLBHC .$73654 · ~]R D i L. BHC ':7366.:, 4 ILl) DiLBHC: ,~77664 iLH DiLBHC 3 ,"-'.3664 LLA [:' i LBHC $73664 DT D ILBHC 37:~664 CiLD r~ILBHC,. '"~7S664 F T 0 0 0 ,:' 0 4 0 t. 8 S 7 0 0 0 ¢~P i 7 i 0 i 0 0 4 0 GAP i 7 54 i 0 Ct 4 0 OHMM 7 i 2 0 46 0 0 OHMH 7 i 2 O 44. 0 O 4 0 OHMH 7 220 6 0 0 U S ,." F 7 8 -" '"'.:, ,~:. 0 0 t, iMHO 7 68 46 0 0 4 0 68 ~b b' 68 68 F' R 0 C E S S i i'-.i [:, i C A T :0 F: S DEPT SP GR R E C 0 R D S i i o 7< q 000 I OOO, OOO i i 7.z.c , 000 i 9 i , 867 I i 638. 000 · '3. 6,983 J i "" · ~,38, OOO 24.,2i 0 t i ,4.38, 000 38.37i ..... 8, no0 i i,.-.."; 7,;"' ,.. :~ 000 i5,849 000 594 i i 07..8, 000 i6. 749 i 0938. OOO ._e bi4 i 0838, 0 O O 363,9t5 i 449, 000 4i~ .... .z,, 000 4t6'2,000 4094, 000 4 065., 000 4055, 000 4 006, 000 4021 . 000 4026, OOO 3947,000 3899,000 0, 000 i 0 i , 000 5 .,3, '200 6'2,400 i i ~S. 300 i.S5. i O0 ti2,000 i 21 , 700 i43.000 151 ,500 i '99,800 0 O0 c,. i0i ,700 2 8, ,._,° 0 0 6 600 8 '2 00 47"' 000 7 400 9 000 25 400 5i 100 97 400 ,4 t 26 29 63 i 04 59 _ i 000 04 0 ; 05 062 5i2 096 704 748 i 00000, 020 '2 0 941 29 7t7 '21 727 34 .':.:";9,i. 60 ._'3',95 · 41 305 i 671 27 '20 2 ,£ 43 7..5 58 2i i 000 848 542 ;2 tt 749 652 858 884 6,27 275 82 99 9 0 i 49 000 b U U Fi 00 000 20 0 9 00 900 sO 0 300 ._'300 File name,: ,:,.~b;-,O'l , 00~, T R fi }~ L E R R E C 0 R D S Fiie, type: LO F ~. i ,.=.: t.,.¢pe: LO ! ii i NFORMR T !., ON, E r' 0 R Dc'. , .., M N E M C: 0 H T E iq T S U H ! T T :'/P E C' A T G S i Z fsi C 0 [;, E C N i.,JH FN C 0 U H STAT _. t SECT T 0 l.,j N EKD b. L)I-- EGL PO L M F D M F R U N L C: C S 0 H LUH Fi.. LUL ENG i W I T N DE'., DL 'fL i TLA8 BHT MR T MT MViS RM RM F MFST MFSS- R MC MCST M C S S STAN[:,ARD ALASKA PRODUCTION CO ~.~ - j 4 0 ,." H A P i N U M ~:'" DATE OF P R U D H 0 E ,~, ~-~ 'r 09 .- 26- N 0 R T H S L 0 P E .................................... 0 0 ':,20 65 A L R S i< A ................. 0 0 20 6 'i'---'" 0 0 20 6 l_ ,=, t-~ , ............................. 04 ....................................................... 0 0 2 65 i 4 E ..................................................... 0 O E'; ¢, 5 53,2 00 .................................................. FT 0 ~ '" O0 FT O 2 4,7_400 ................................................... F T 0 M S .............................................. K B ................................... KB .................................. 0 ] '-' i ....................................................... O, 0 1:2 ,'" .30 .............................................. ........ 0 0 2 7' 9 · .%73664 .................................. . .............. 0 0 iO 65 ,.~i2 ..................................... 0 0 NORTH SLOPE .................................... 0 0 20 65 NORTH SLOPE .................................... 0 0 20 65 CUNN iHGHAM .................................... 0 0 20 65 i 1800, OOO ............................................. ; , , t'-"T 0 i!8'i4 OOO ........ Fi" 0 ~ " 6:.9 i 0000. 000 ............................................... FT iiSi O, OOO ............................................... FT 0 22 ~'00 HR 0 2 4 68 9. '"'c,_, L{O ........................................... ........ HR 0 4 4 68 i 78,000 ................................................. i 78, 'O 00 ................................................. DEGF 0 i 4 6;.'8.' DSP S 0 L T E ::..',' .................................... 0 ';,..: '20 65 &._., FLOWL l NE 0 ';' '--' 0 ' , . . 38,0 O 0 .................................................. CP O ';' 4 68 I , 5 i 0 ................................................... OHMM 0 2 4 68 i , 37 0 ................................................... 0 H bi M 0 2 4. 68 7 i , 80 O .................................................. DE~]F 0 '2 4 68 i"i~R._~ ............................................. 0 2 i 2 6, 5 2,560 ................................................... OHMM 0 2 4 75.,200 .................................................. DEGF 0 2 4 6.._--; MEAS 0 .z, i '~ ;-5 i , . ,.. , . ,~ , , , . . , ,. . , , . , , . ,, , , , .. , . r . . , , . . . . , ,~ . . , , . , ~ ~ '-" F' a g e i i R E C': O R D i"ihi E.H S E R',,,' i CE UN I T HFiEH [> E P T H F E E T [:, E P T T E N i S L C:, C i'.~ S L. B S T E N S CALi ~ SL. DCNS iN CALI R H 0 S ~ S L D C N ~:~ G /C 3 R H 0 B DRHSi SLDCNS G/C3 DRHO FCHL ~ SLDCNS CPS FCNL N C: H L t S L [> C: N S u~.~ ~' '~ N C: N L L. SDP i SLDCNS C:HAN L S[:,P C:UPEi . SLDCNS CPS CUPE SSDP'I SLDCNS CHAN SSDP ~:~tJA L I SLDCNS ~?UAL FSL. D ! SLDCNS L:P'5 FSLD NSLD ! SLDCNS CPS NSLD LPCT I SLDC:NS CPS LPCT L C C T 'i S L D C N S C P S L. C C T Sr.C:Ti ,q, ~.~,~. . __ ...... L~-,~ O CPS ~;L:L: T PEF t SLDCNS B/EL PEF SERVICE UNiT FT LDTCNS LBS i.. [:, T C N S G A F' i L [:, T C N S i Fi I..DTCNS L. [:, T C: N S G ,.." C; .S L [:, T C: N S C P 'S Lb'] brqo C:PF; L £:, T C N S C: H ~ N L[::TCNS CPS L [:, T C N 5; C ia ~. N LDTCNS LDTCNS CPS LDTCNS CPS L [:, T C f4 ::; C P S L. [:, T C F:i S C: P S L £:--' T C N S C: P , r.~ ].. ,--., 4 ,-. ~..~.. , ,_.~'.,.-, B,-"EL DPHS ~ NPHS i RAT ~ SLDCNS SLDCNS SL.[~CNS PU SSPU DPHi NPHi NRAT LOTCi'.iS LDTCNS L.C:TCNS F:' Li PLJ ' ' DATA FORMAT ENTRY TYF'E S i ZE C:ODE 0 i 66 P a g '~: ENTRY BLOCK LEGEND TYPE DESCRIPTION 0 't"er. mina+..or ( no more entr [)ATA FORMAT DATUM SPECiFiCATiON BLOCKS SERVICE SERVICE APi APi APi API FiLE MNEM ID ORDER f~ UNIT LOt TYPE CLASS biO[:, ~ DEPT ~:7S664 FT O 8 TENS LDTCNS 37~66'i. LBS 45 0 GR LDTCNS .~; ,'.~ a,, 64 GAPi 45 54 CALi i_DTCNS .373664 iN 45 24 RHO8 LDTCNS '~7:;664 G/CS 45 94 DRHO LDTCNS 373664 G,."C3 45 tOO FE:NL LDTC:NU ~,-S664 CPS 40 ,.8 NCNL LDTCNS .]47~664 CPS 45 78 LSDP LDTCNS 37~;664 CHAN 45 0 C:UPE LDTCNS 373664 CPS 45 0 SSDP LD'i'CNS ~7i;664 CHAN 45 0 g~'I.J A LLDTCNS 37~664 .......... 45 0 FSLD LDTCNS S7.~664 CPS 45 0 HSLD LDTCNS 37._-4664 CPS 45 0 LPCT LDTCNS .~73664 CPS 45 0 LCCT LDTCNS 37G664 CPS 45 0 SCCT LDTCNS 373664 CPS 45 O PEF LDTCNS S73664 B/EL 45 O DPH! LDTCNS ~7S664 PU 45 i22 NPHi LDTCNS 3,.'"3664 PU 45 i22 NRAT LDTCNS 37b'664 45 i 64 0 0 0 0 0 'i 0 i 2 0 i I 0 i 0 ._, t 0 ,:, 0 0 i 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i 0 0 '! 0 0 i O 0 i !'2 0 i 0 PRC ~ SiZE LYL :-]MPL RC 4 0 i 68 4 0 i .¢., p, 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i. 68 4 0 i 68 4' O i 6, 8 4 0 i 68 4 O ~ 68 ,4 0 i 68 4 O i 6'8 4 0 i 68 4 0 i 68 4 O i 68 4 0 i 68 4 O i 68 4 0 i 68 4 0 i 68 4 0 i G'-" PROCESS iH[:,iCATORS 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 OOO000 000000 000000 000000 000000 000000 000000 000000 -O0000O 000000 000000 000000 000000 O00000 000000 000000 000000 000000 O00F~O0 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 O0000F~ 000000 000000 000000 000000 000000 000000 OliO000 000000 000000 000000 000000 000000 000000 14 D ~ P T L S D P SCCT T E N S C U P E PEF SS['P DPHi DA. C¢~L t QUAL N l~ H t TA REPORD o RH08 DR HO N S L D F C N L L P C: T N C N L L C C T Page i 5 i i 8..:, ,' ,., 00 '! i i. :~8 0 O, 000 ! 712, 000 O, 000 O, 000 O, 000 !ii,030 8,970 0, 000 i , 06 0 27 80n ":' 502 i , 000 - 99'3,250 i . 000 0.000 0,000 0, O00 0 000 i i,,.7 500 ii0,910 32,"::';I , 000 4870, OOO .883 2,660 i 2i. 600 iii ,270 9, i 60 i, 0i 0 .32,82 0 '" 5'36 · 2,324 ii8 .... ,, -.~ 0 .~, ..;;, i O:?, 300 922,000 22 i , 1 00 i 762, 000 1 1637,500 t I O. 'y,"u 14015,000 4572, 000 i ,385 2,590 32,700 iii,~60 i 9,27'Z4 8,640 i, 0:..~ 0 28,930 '2,332 0495 · 4 i 8 2, 078 , 009 i9'~5c, 574 i4i ,600 i S; ~; 9, 000 ~ .... 500' 3028, 000 t t ~347 i 1i, t'30 17044,, 000 ,4670, 000 , t, lKo 2, i 20 I 8,500 Iii ,500 .c.., . ..s ~,; 0 i . 040 29,53!3 2,i92 I ..5848,92 0 2, i 7"9. .026 24i54,586 1.34, i 00 225R. 000 ""-' .~; ~ 500 · '~ 8 S 5,000 it4~7 iii,240 --z,o 0 i4. b._,~, O0 4533,000 i,96i i,8i0 2'2,300 t!i,6i0 24,7'27 8 , 770 t , 080 28.7i0 2,24.'2 i 4825. i 82 2, 094 , 028 'i 037 7'"' i :'-"; 0.000 223'i . 00.0 ;300,000 3502. 000 i i337,500 ii0 :¢0 i~,''A , ... ~= 8 000 , '4 ~:,4 0 000 i ,2a3 2,i2o 6i.200 ii!,540 i6,424 8,850 i, 060 24,820 2 ~ 79 ,, ,,.,.~ 89i2,506 i , 884 ,020 9 06 i62,500 i 4~'~ 000 295, 000 '--'4~:,5 000 ,=:. ..... 500 i!0,920 i 5065,000 4372. 000 i ,706 2, 000 i9,100 t i i ,5:$0 24 i 8;2 8,660 i .~.s 0 '2i , 9?0 2,25i i ._'g899,527 i, ;-'*;"'8 18c' 300 i 974,000 328,800 S446,008 i I i37,500 ii0,950 i 4897,000 4416, OOO 1 , :378 1 ,770 ._,_ ,o00 ili .590 24 8,61 C i, 040 i9. i60 2,248 i 2676 , 506 i . .'z, '~ .5' -, 002 19860,9i8 263. 300 2ii5,000 11037,500 !!0,870 .~bo~,O00 4450,000 i,648 '2.070 3i,800 i!i,680 21.333 o 9i¢! i . 02 0 '22, 04 0 2. 298 ! 2359,46 9 I , 7'30 ,0i9 · 2i 037'. 78i i 77, ~00 i 825,000 3,.. ,_,q ':', ,...::',. fi_ fi. 3638. 000 TA i}EP'ir. TENS ~]R CAL. I P. HOB L S [:, F' C U P E S S D P ~,~ U A L F- S L D ¢~CCT PEF DPH ."( NPH i NRAT DRHO N S L D F' C' H L L PC T i'4 C H L L. C: C: T i :S '!0937,580 44.45, 000 54,408 8,990 '2,2!4 ~.i0,730 "2, i25 ~ti ,~70 'i ,090 !3835,650 i673:3, 000 2,i60 26,424 28,000 2, 097 i, ~., ,,, ,,, 00 48 ~.- 6 ,000 t i t , 6_, 00 '9.. ,o~: '~' "" 0 ;;7'., 2 F i i 0. 430 2 , 427 'i I i , 070 t , 000 i°'~':' -":¢'~....,,-.~.., , i29._. ........ Z. 2 . ' .-..=; ~.z~ , - . .... 2 0 ~_'_456 00 O ;~ ~'~. O '~' '--' 4 o .... _,. 0 'i ,0 ._~ i ~ , 075 '22i 30,9i 0 , i78 27:989,809 J33 ,SO0 '" ": "' '"~ O 00 5'2,200 26= - _ ;262 , '200 4260, 000 150,000 62S4. 000 Ma::.::irr~um l~ngth: i 024 T R A Z'"'* '" LER KECORD:~. Fil~= t.!:,p~: L.O Fiie name: C4GSFOi , C~03 Haximum tength; I024 H E A D E R R E C O, R D 'q,_ D a"o e ~ Fiia t.l:..'pe; LO P.,,'--,~:v:fous {'i ie:: M N E !"! CN WH FN CO U H STAT CTRY SECT T 0 (d hi RAN(] EK8 EDF EGL. PD LHF DhiF RUH LCC SON LUH FL LUL EN~i WITN DD DL TLi E,'Li TCS TLA8 8HT NR T MT hi S S HviS RN RHF H F S T biFSS RMC MCST MCSS "HF ON RE ORL:,S o. R H A T i: r' C 0 H T E H T S S'TANDRRD ALASKA PRODUC;TiON CO i<-i4 O/'H APi HUH: 50-.029-2i752 ................ PRUDHOE BAY [:,RTE OF JOE:: 09-26-87 HORTH SLOPE . , ..................... A L A S i< A US A ................. ................... 5~, 2 0 0 .................................................. F T 2 4,3 0 0 .................................................. F T S~36 ¢' 64 , : ~ : , , , : : : : , : : , , , : , : : , , , , : ~ , .... 76 i 2 NORTH SLOPE ................... NORTH SLOPE ROEDER E:UNN ~ H6H~H ~ ~800, 000 ............................................... FT i i8i4.000 ............................................... FT ~ 000~, 000 ............................................... FT ! i8~ O, 00~ ............................................... FT 22,300 .................................................. HR 9.5 00 ................................................... -:'R a00 oEGF DSP SOLTEX ..... , ~8, O00 .................................................. CP I , 5 ~ O ................................................... OHHH ~ , 37 0 ................................................... OHMM ME~S 2: 56 O ................................................... OHHH 75. z u v .................................................. DE6F MEAS C A T &" S .i Z E 3:3 0 E Pa9 e H N E H S E R ',/I C: E U N I T t'1 i,i E H ::.: E R ? .i C: EU f.l i T D E P T Fi F E E T [:' E F' T F T TEN4 t ] ~ ~-.: J~_ LBS TEi'.tS FtERGE LBS GR,4 biERGE GAP i GR f'iERGE GAF' i 2 0 [) A T A E i'-i T R Y Fi]RMA T ePEF: i F ~ Cfi T Y P E S ! Z E C O[)F 0 i 6 E. T I OHS 2'! : F'E [:,ESCR iPT i Of,i 0 Ter.~inato~ .... :.' no mor. e enf:.r'ies ) £)ATA SERf'/ICE SERV!C:E MNE!'i ID ORDER ~ AP]; APl AF'i APl FiLE UNiT LOG TYPE CLASS MO[:~ ii [:, E P T' TEl,IS MERGE GR MERGE PRC ~ SiXE LVL SMPL 4 0 i 68 4 0 i 68 PROCESS iPJDiCATORS 000000 000000 000000 000000 000000 000000 i 08.'~9.. . ~.,nO0 3996 000 78 . 400 10779, OOO 3996 000 5 6,5 0 O · ., ," , 000 104, ., () 0 O 7_4938 0 08 53,200 000 6!,900 10379 000 3864 OOO 6 0, 00 0 t 027' 9 000 ..-~ ~_ ~:.'-' t 000 4i,600 t ri. i 79 00 O ,.:~-'/6, ':",_ fl. 0 O 4.5,900 10079 000 3728 OOO 55..500 Fila name: ~<GSFOi , Ma::..'. i mu~ i e:ngth: i 024 Fi ie: t'.?'l::,e: L,O MICROFILMED A~ASKA COMPUTING CENTER CORPANY NAME WEbb NAME rIEbO NAME BOROUGH STATE _ _ AP/ NUMBER REFERENCE NO BP .EXPbORATION A A~8:A 50~-~9-21752 73751 IS Ta ep Verification Listing ~chlum~erger A1 asea Computing.. Cent er 19',,MAR-1990 20:31 PAGE: SERVICE NAME : EDIT DATE : 90/03/19 ORIGIN FLOC REEL NAME ~ 73751 CONTINUATION # : - PREVIOUS REEL : COMMENT I BP EXPLORATION, PRUDHOE BAY~ K-14, APl #50-029-21752 **** TAPE'HEADER **** SERVICE NAME : EDIT DATE : 90/03/19 ORIGIN ~ : FLIC TAPE NANE : 73751 CgNTINUATION # I ! PREVIOUS TAPE : CO~ENT : BP ExpLORATION, PRUDHOE BAY, K-14, RPI #50-029-2!~52 FILE NAME : EDIT ,001 SERVICE : FLIC VERSION : 001A04 DATE : 90/03/19 MAX AEC SIZE : 1024 rILE TYPE I LO LAST FILE : SCHLUMBERGER WELL SERVICES ** COMPANY NAMEI BP EXPLORATION WELLI K-14 FIELD: PRUDHOE BAY BOROUGHI NORTH SLOPE 8TATEI ALASKA API NUMBER: 50'029-21752 LOCATXONI 1909' FNL & 4106' WEL SECTIONI 4 TONNSHIP~ llN PERMANENT DATUMt MSL ELEVATION: 0 RANGE: 14E chlum er~er' leslce Com. Utln~ Center LOG MEASURED FROM KB 53,2 ABOVE PERMANENT DATUM ELEVATIONS KB: 53,2 DF.* 52,2 GL~ 24.3 DATE LOGGED{ 12"MAR-90 RUN NUMBER: TD LOGGER.* 11749 CASING i.* 9 5/8" 47 LB @ DRILLER DEPTH OF 0 TO 10827 C~SING 2= 7" 26 LB 8 DRILLER DEPTH OF 1.0567 TO 11800 TUBING= 4 $/2" $2,6 L.B 9 DRILLER DEPTH OF 0 'TO $062 TAILPIPE~ 4 1/2" BIT SIZE = 12 ~5" bOGGING DISTRICT.* LOGGING, ENGINEER= WITNESS I TIME LOGGER ON BOTTOM= 11:30 12-MAR 46 ! 5 JOHNSON/$ARBER/RATHERT TEEL TOoL NUMBERS{ CNC,,DA-146 CAL,,UB,,276 ATM,,AR'3 4 FIELD REMARK~iEDR' INTO CBT 10/30/87. 1'5' SHALLOW TO BHC BELOW 11625'. WELL SHUT'iN AT $0..58 3/12~90, ' ' GAS IN NELLBORE ON FIRSTuPA&$. _ . . PUMPED IN 18i BBL$., PROD¥CED ~ATER & 50 BBL$,' METHANOL, STARTED LOGGING AGAIN e _9~0!,_1 ., APPARENT GOC' $I$456'. NOTE INCREASED GR 10996,- 15627 & 15636' - !1554'. THIS IS AN INDICATION OF WATER PRODUCTION SCALE DEPOSIT, DATE JOB STARTED= 19-MAR-90 JOB REFERENCE NOI 73751 LDP/ANAt KOHRING 'PAGEI FILE - EDIT,O01 BP EXPLORATION PRUDHOE BAY * K'14 * API #50'029'21752 TaPe reFit!cation Listing ;chlum,ergerb Aiaslca ¢omputln~ Center 19-MAR-Iggo.20~31 DATA SAMPLED EVERY-.5000 FEET DATA INCLUDED TOOL EXTENSION TOOL TYPE USED NAME CNT-A/D/H ..PS1 COMPENSATED NEUTRON 11745' TO I07 CNT-A/D/H ~'PS2 COMPENSRTE~ ~EUT~ON li74'5'~ TOTO ~07~:~. . 45' TO PA. GEI 3 TABLE TYPE I CONS TUN.I WN K 4 APIN ~$0-029 I752 FL ~909' ~L & 4106' SECT TOwN RANG COUN NORTH. SLOPE STAT ALASKA NATI USA W/TN TEEL :SON 381377 PDAT MSb APD FI 53,2 EKB FT 5 EDF FT 5~'2 EGL FT BbI FT 1 , -TLX FT l~800, TLAB 11130 12=MAR VALU DEF'! · .. ComPany.Name Field Name Well Name AP1 Sari. al Number rleld Location 'seetlon Township Rang9 County Sta~e or'Province Nation witness' Name Service Order Number Permanent datum bog Measured From ottom Log Interval op boq'Interval . Time Logger At Bottom I~$ ?a~e verification bistSng chium erger Alaska Computlng center 1g-MAR-1990 20:31 TABLE TYPF,., = CURV DEFI DEPT Depth Channel,~Name NPHI Neutron Porosity NPH! Neutron Porosity TNRA Caiibrated Thermal Neutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC .CFTC GR Gamma 'Ray TENS Tension CCbNp.! .Neutron¢Cb AmPlitude rosl,t~v i Neut Ratio TNRA Callbrat~J Ther a ton RCNT RCNT RCFT RCFT CNTC · ~[TC CNTC .CFTC Gamma Ray TENS Tension CCh CCh Amplitude. NPH! Neutron Porosity TNRA Callbrated Thermal Neutron Ratio RCNT RCNT RCFT RCFT CNTC ~TC CNTC CFTC Gamma Ray TEN8 Tension CCh CCh A:mplitude NPH! Neutron Poroslty TNRA :CaIlbrated Thermal Neutron Ratio RCNT RCNT RCFT RCFT CNTC CNTC CFTC CFTC GR Gamma Ray TENS Tension . CCh CCh AmplitUde PAGEl DATA FORMAT SPECIFICAT!.ON RECORD ** SET TYPE - 64EB ** TYPE REPR CODE VAbUE 1 66 0 2 66 0 IS ~Tape Vert~lcatlon Llstincj :1g-MAR-1990 20~31 Chlumberger AlasKa Computing Center TYPE REPR CODE VALUE 3 73 I52 4 66 5 66 6 73 7 65 9 65 13 66 0 14 65 F~ 15 66 68 16 66 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE APl APl API APl FILE NUMB NUMB SIZE REPR PROCE$8 ID ORDER # LOG TYPE CLASS 'MOD NUMB SAMP EbEM CODE (HEX) . DEPT FT 38! 77 .P.! .LA PU 38! 77 NP.I PS1 PU 381377 TN'RA PS, 381377 RCNT P$1 CPS ~37 RCFT PSl CP~ ~o,371 CNTC PS1 CPS 381377 c Tc Ps1 cps 38 377 1377 T.NS PSt LB 38,377 CCL P81 V 381377 .PHI PS2 PU 381377 TNRA P82 38!3 77 .C.T cps GR P$2 GAPI '38!377 TENS PS2 LB, 381377 CCL P82 V 381377 NPH! PS3 PU 381377 TNRA PS3 38!]~7 RCNT PS3 CPS 381 7 RCFT PS3 CPS 381377 CNTC PS3 CPS 381377 CFTC PS3 CPS 381377 GR PS3 GAPI 381377 TENS PS3 LB 381377 CCL PS3 V 381377 .P.1 PS4 PU 381377 TNRA PS4 381377 O0 000 O0 0 1 O0 000 O0 0 1i I 4 42 890 O0 0 1 I1 4 42 420 01 0 42 4~ 0 O1 0 42 4 0 01 0 1 1 1 4 42 420 O! 0 4 1 42 150 01 0 I ! 1 4 42 890 O0 0 I 1 I 4 420 Ol 0 4 42 1 1 1 42 410 01 0 1 I 1 4 42 4' 0 O1 :0 I I 1 4 42 4 0 01 0 I I 1 4 42 420 O! 0 I 1 1 4 42 310 01 0 1 1 I 4 42 6 0 'iIlo o,o I 4 4 0 Ol 0 . , ! 4 42 420 O1 O- 1 1 I 4 42 420 01 0 I 1 1 4 42 310 O1 0 1 I 1 4 42 635 21 0 1 1 I 4 42 150 Ol 0 1 , 1 4 42 890 O0 0 I 1 ! 4 42 420 01 0 1 I I 4 68 0000000000 68 0000000'0.00 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 O0 0 68 0000000'0~ 68 00000000 68 0000000000 68 0000000000 68 ~0000000000 68 0000000000 68 0000000000 68 0000000000 68 000.0000000 68 0000000000 68 0000000000 68 0000000000 68 0 O0 ogg°° oooooooooo 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 TaPe verification Listing chlumberqer AlasKa ComPuting Center 19,,,MAR.,1990 20{31 :6 NAME SE'RV UNIT SERVICE APl APl APl API Fib NUMB NUMB SIZE REPR PROCESS UM~ CUEX) N CODE EbEM ID ORDER # bOG TYPE CbASS MOD SAMP DATA DEPT RCNT PSi CFTC PS2 NPHI CNTC PS) CCL PS3 RCFT PS.4 -TENS PS4 DEPT RCNT PSi GR PSi TNRA PS2 CFTC PS2 NPHI CNTC PS3 COL PS3 RCFT PS4 TENS PS4 DEPT RCNT PSi GR TNRA PS2 CFTCPS2 NPHI PS3 CNTC CCb~P$3 RCFT P$4 TEN8 PS4 DEPT, RCNT.PSI a ;eSl TNRR,P82 CFTC,P$2 NPMI,PS3 ooo 9 250 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 11700 000 2110 59 i38 663 431 62~ 000 1220 000 11600 000 2216 450 28 547 4 369 623 836 29 772 2755 063 0 O00 508 475 1t70 000 500,000 11859 29 5,149 639,260 27,724 NPN! HLA RCFT PSi TENS PSI RCNT PS2 GR P$2 TNRA PS3 CFTC PS3 NPHt P84 CNTC PS4 CCh P84 NPHI HLA RCFT PSI TENS PS RCNT GR PS2 TNRA PS3 CFTC PS3 NPH! PS4 CNTC PS4 CCh PS4 NPHI NbA RCFT PSl TENS PS RCNT GR TNRA PS CFTC P$3 NPHI PS4 CNTC PS4 CCL PS4 NPHI HbA RCFT TENS PS1 RCNT P82 GR PS2 TNRA PS3 2 g "999 00 '999 '999 9.50 '99 50 '"999 150 -999 50 '999 250 467 2 1250 0 2825 i32 45 )63 0 000 4~7 4~0 000 O94 5 016 2925 702 0 000 ,176 30;00o NPNI CNTC PS1 COb PSI RCFT PS2 TENS PS RCNT PS] GR PS3 TNRR PS4 CFTC PS4 NPHI CNTC,.PS1 CCh PS TENS PS2 TNRA PS4 CFTC P$4 NPHI,PS1 CNTC,PS1 CCh,PSi RCr?,P$ TENS.PS2 RCNT;PS GR.,PS TNRA,P84 CFTCeP84 NPHt,PS1 CNTC,P$1 CCh,PSi RCFT,PS2 TENS,PS2 RCNT,PS3 -999 999 ,,999 250 TNER 250 CFTC 2 0 ,2~0 NPHI CNTC 999~ CCL -9~9 50 RCFT -9 §=250 TENS -999 250 RCNT -999 250 GR PiS PS2 0 658 1240 1982 674 962 TNRA · 505 CFTC 000 NPH! 009 CNTC 000 CCL GE PS P82 r,l.l PS4 PS4 0 566 3 ~NRA PS 1 CFTC PSi 0 NPHI P$2 7 CNTC-PS2 000 CCh PS2 339 RCFT,PS3 469 TEN PS4 639 RCN~rps3 206 GR PS4 29,504 TNRA,PS1 3198,999 CFTC,PS1 0,000 NPHI,PS2 584,071 CNTC.,P82 1200,000 CCh,PS2 2859,729 RCFT,PS3 .' 9,250 9,,2,50 "-999,'250 :'~999.}250 ~9994~250 :-999.,250 ~-999250 4'.283 562,724 ~22;~018 3019;'770 :0.000 470;588 .1205,000 2320,346 47,,063 000 see 1.205 000 4,984 635,328 ~30,869 3269,$10 0,000 65i,594 chlum.erger'Alas~a Comput t CCL.,PS3 D£PT RCNT PSi THRA PS2 CFTC PS2 NPH! CNTC :CCL PS3 RCFT TENS PS4 DEPT RCNTPS1 TN~ PS2 CFTC NPH! 'PS3 CNTC P83 CCLPS3 RCFT PS4 DEPT. RCNT. PSl .TNRA CFTC NPHI~I3 C~TCi TENS PS4 DEpT RCNT PSI GR PS TNRA PSi CFTC PS2 NPHIrPS3 CNTC PS3 RCFT PS4 TENS PS4 DEPT RCNT PSi GR PS1 TNRA PS2 CFTC PS2 NPH! PS3 :3238,580 ooo 6 :766 11 0,000 11400 000 3837 i04 t180 446 19 237 4389 3t3 O 000 1108 225 1155000 300 000 868 10! 23 210 0 000 817 021 1155 000 11200 000 4444 444 11547 918 171 861 5It . 000 1582 609 1145 000 lllO0 000 5631 067 13 078 2 475 2569 529 271 0 000 2347 826 1150 000 11000,000 39~1,!65 1,750 3,567 1229,633 18,499 NPH~,PS4 CNTC,PS4 COb,PS4 NPHI'HSA RCFT~PS1 TENS;pSi RCNT;.'PS2 GR;PS2 TNRA,PS3 CFTC,PS3 NP,HZ,PS4 CNTC,DS4 CCh,PS4 NPHI,HLA RCFT,PSI TENS,PSi RCNT'PS2 GR,P$2 TNRA~PS3 CFTC~PS3 NPHIPS4 CNTCPS4 CCL PS4 NPHI.,HLA RCFT,P81. TENS,PSi RCNT,P$2 GR,PS2 TNRA,P$ CFTC.,P$~ N~RI,PS4 CNTC,PS4 CCL,PS4 RCFT. P$1 TENS, psiPS RCNT, GR:ps~Ps TNRA CFTC. PS3 NPH! P$4 CNTC PS4 CCh PS4 NPHI.HhA RCFT,PS1 TENS, PS1 RCNT~PS2 GR,P$2 TNRA,P$3 , 8 :TN{~A,PS4 Oo 0 ·19 i I94 i .i 90 · 3914 · I0 4389 0 3 NPHI,P:S! CNTC,PSl RCFT,PS2 5 RCNT,PS3 ~ TENS,PS2 :GR'·PS3 'TNRA'PS4 ~0 .23.828 ~ 190,0 ~ 0 R~::~ 3268;:0:5 13,305 4,184 RCNT 8§6,4,~2 :'GR 24,45 ;TNRA 3910,982 CFTC 0,000 .13,.9~5 N'PHI :!5~0,000 CNTC :11,594 5148',504 CFTC 0,000 238 9 252~ 10 6298 0 596 889 CNTC 000 ,t30 734 TENS 542 RCST 496 TNI~ 446 980 CFTC 000 18,t64 11.75,355 !195,000 3860,870 20,906 3,551 PSI PSi PS P.83 PS4 PS I. P83 PS3 PS4 :PlS ,PSi PS ,PSi PS2 PS3 PS3 PS4 PS4 NPH! PS1 CNTC PS1 COb RCFT PS2 TENS PS2 RCNT PS3 13'320 TENS'PS3 5'044 RCNT,PS4 648,865 GE,PS4 43~!,264 TN.A'P$ ,079 CFTC P:~l :: ,000 NPHI '.PS2 1066,667 CNTC PS2 1225,000 CC~P$2 3909'502 RCFT;PS3 ,953 TENS;~PS3 I'],596 RCNT;PS4 1209,697 OR;,PS4 ,26,395 TNRA PS1 3636,942 CFTC PSi :0,:000 NPHI: PS2 8t4;259 CNTC.PS2 1~70'000 CCb;,PS2 12,016 TENS,PS3 4,352 RCN:T;'P$4 85:8,402 GR,P$4 1.4,231 TNRA,'.PSl 5003,i82 CF'TC,PS1 1558;44! CNTC,PS2 1190,000 CCL,PS2 ':2,947 RCNT,P84 1726,299 GR"P$4 · 9.g43 'TNRA~PSl 6372,616 CFTC,PS1 0,000 NPHZ,'P82 2389'380 CNTC,PS2 Ii70,000 CCL.P.S2 5 29'629 RCF~;PS$ 16.125 TENS,PS3 · 2.454 RCNT,P$4 2582.690 GR.PS4 16 747 4349 858 0 000 115 044 145 000 3851 852 TNRA,-PSI CFTC,PSl NPHI,PS2 CNTC'PS2 CCL.PS2 RCFT.PS3 .1570,000 '2921.,739 i4'914 4407 066 ~:i 30 ::0~0 :3880 8 t 788.;22.4 :0,000 796'296' .1160;000 3473,340 .t7,875 0 000 240 ~00 .!328,~02 .18,6i8 434~,657 0,000 1158,371 19~r~AR..,t990 20=3.1 C~T¢,PS3 CCh,PS3 ReFT,PS4 TENS,PS4 DEPT TNR~ PS2 CFTC PS2 NPH! CNTC PS3 CCL PS 3 RCF? PS 4 TENS P$4 C T. PS GR PS1 ?NRAPS2 CFTC P$2 NPH! P$3 CNT~ PS3 CC~ P$3 RCFT P$4 :TENS P$4 DEpT ReNT GR PSI TNRA CFTC PS2 NPH! PS3 CNTC P$3 CC~ PS3 RCF? P$4 TEN8 PS4 4374,437 CFTC,PS3 0,000 NPHI, PS4 40,426 CNTC,P$4 ~ 50,000 CCh,PS4 lOgO0 000 3533.980 37 219 3 7O2 1047 864 18 828 3757 348 0 000 904 348 1110 000 10800000 1902 9113 265 6 60 311 1g1~1449000 250000 · ti30000 10796,000 'ggg,250 '999,250 '999'250 'g99'250 -999 250 -g99 250 -999 250 '999 250 '99g 250 RCFT Si TENS,PS! RCNT PS2 T~RA CFTC NPHI P$4 CNTC PS4 CC5 PS4 NPHI HLA RCFT PSi TENS PSi RCNT P$2 GRPSpsI TNRA CFTC PS3 NPH! PS4 CNTCPS4 CCb,:PS4 NPHI:HbA RCFTP$1 TENS PS1 RCNT PS GR TNRA.'P$3 CF?C,P83. NPHI,PS4 CNTC;P$4 CCh'PS4 .ig 629 985 782 !190 000 " 78! ~20 log 396~ 0 000 52 295 270531 .1160000 1777.:778 :0,000 ggg;250 'gg9,250 -999,250 ~999,250 '999,250 ~999.250 NPH! CNTC PSi CCLP$i RCFT~P$2 TENS PS2 RCNT PS3 GRIPS3 TNRA PS4 CFTC PS4 NPH! PS1 CNTC PSi CCh RCF~ P$2 TENS P$2 RCN? PS OR :TNRA PS4 CFTC PS4 NPBI, PSl CNTC PSi RCFT :TENS. PS2 RCNT PS3 Ga PS3 TNRA P84 CFTC P$4 ** END OF DATA ** ,470 RCNT,~PS4 1:284':247 19,807 TNRA,PSI 3944,724 CFTC,PSi '0,000 NPHI',P$2 1 942,.22~ .CNTC,PS2 150,000 CCh. PS2 333'333 RCFT:~P$$ 40'625 TENS,PS3 3,778 RCNT,P$.4 I039,260 GR,PS4 49,085 TNR. A: 211g,258 CFTC. 0,000 NPHt 250,089 CNTC pS¸ PS2 PS2 ,Ps 3 ~P84 t 50; ooo 666,667 45,438 'TENS 7,614 RCNT :252,801 GR PS4 'ggg.250 '-ggg.250 999,25 -999,250 -999,250 :g99,250 ~999,250 999,250 TNRA,P$1 CFTC,PS1 NPHI.,.PS2 CNTC.P$2 CCh,PS2 RCFT,'PS3 RCNTeP84 GR,P$4 PAGEI tiio'ooo : 3 ~i:9'618 ~37. g4,539 0,000 ,925,926 1145,'000 335g,307 42'313 295.;.:251 ~5~,793 i950,994 :0,000 222,222 llIS,000 4~,t:25 :'ggg,250 'ggg,250 :-ggg;i50 :'~999,250 ggg*250 ,-,,, '999: **** FILE TRAILER **** FILE NAME = EDIT ',001 SERVICE = FLIC VERSION = 001A04 DATE I 90/03/19 MAX REC SIZE I 1024 FILE TYPE I LO LAST FILE = :Tape Veriiication Listing ;chlomDergerAlask8 Computing Center !9-~AR-1990 20:31 **** TAPB TRAILER **** SERVICE NAME i EDIT DATE I 90/03/19 ORIGIN ~ FL!C TAPE NA!~E ~ ~! CONTINUATION ~ : 1 ~ EVIOU~ TAPE ~ COMMENT I BP EXPbORATION~ PRUDHOE BAY, K-~4, API '~50-029-21752 **** REEL TRA!LER *~** 'SERVICE NAME :: EDIT DATE I 90/03/19 ORIGIN I FLiC REEL NA~E I 73751 CONTINUATION # I PREV!OU& REEb g COMMENT I BP EXPbORATION, PRUDHOE BAY, K-14, APl #50-029-21752 9