Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout187-095STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION pEC 1 ~ 2007
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
~lasi~a Oil ~ Gas Cons. Comrt~issi~l~
1a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended
zoAAC zs.,os zoAac zs.,,o
^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1b. Well Class:
®Development ^ Exploratory
^ Service ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.
11!10/2007 12. Permit to Drill Number
187-095 307-245
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
09/10/1987 13. API Number
50-029-21752-00-00
4a. Location of Well (Governmental Section):
Surface:
' F
' 7. Date T.D. Reached
09/26/1987 14. Well Name and Number:
PBU K-14y
1909
NL, 4106
FEL, SEC. 04, T11N, R14E, UM
Top of Productive Horizon:
2750' FNL, 3811' FEL, SEC. 09, T11 N, R14E, UM
8. KB (ft above MSL): 53.20' -
Ground (ft MSL):
15. Field /Pool(s): ,
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
3356' FNL, 3870' FEL, SEC. 09, T11 N, R14E, UM 9. Plug Back Depth (MD+TVD)
11756 ~ 8964 Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 671441 y- 5975311 Zone- ASP4 10. Total Depth (MD+TVD)
11800' _ 8992' ' 16. Property Designation:
ADL 028303
TPI: x- 671876 y- 5969200 Zone- ASP4
Total Depth: x- 671849 y- 5968592 Zone- ASP4 11. SSSV DeN A(MD+TVD) 17. Land Use Permit:
18. Directional Survey ^ Yes ®No
Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1900' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
DIL, BHCS, LDT / CNL-raw, Laserlog MWD Resisstivity & TVD
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
WT. PER FL GRADE TOP BOTTOM " TOP" BOTTOM.. SIZE CEMENTING RECORD PULLED
20" Conductor Surface 110' Surface 110' 8 cu ds Concrete
13-318" 72# L-80 / S-95 Surface 2720' Surface 2720' 17-1/2" 4185 cu ft Arctic Set II
-5/ " 47# L-80 Surf 1083 ' Surfa 83 8' 12-1/4" 2375 cu Class'G'
7" 26# L-80 3968' 10467' 3611' 80 1' 8-1/2" 1095 cu ft Class'G'
7" 26# L-80 10567' 11800' 8151' 8892' 8-1l2" 414 cu ft Class'G'
23. Open to production or inject ion? ^ Yes ®No 24.- TuawG RECORD
If Yes, list each i
(MD+TVD of Top & Bottom; Pe nterval open
rforation Slze and Number): SIZE DEPTH SET MD PACKER .SET MD
None 4-1/2", 12.6#, 13Cr80 10435' 10348'
MD TVD MD TVD 4-1/2", 12.6#, L-80 10463' - 10662' 10501'
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
/~y~~ g`y (~
~I~~~~ p~C ~ ~ ZOQ7 DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
11221' Set Whipstock
P&A with 30 Bbls Class'G' below Whipstock
26. _ PRODUCTION TEST
Date First Production:
Not on Production Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date Of Test: HOUfS Tested: PRODUCTION FOR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
PreSS. Casing PreSS: CALCULATED
24-HOUR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Cores Ac uired? ^ Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
Otf,~il'~ETIO~
D
None ~i`1~ y ~'(}}n({~}~ 1 // ~///~
I ?d ~~ 114.. ~~ l 4V Vl ~Ie~ ~f/
i
t ~`',~%
Form 10-407 Revised 02/2007
CONTINUED ON REVERSE .SIDE
V
2>3~. GEOLOGIC MARKERS (LIST ALL FORMATIONS A KERS ENCOUNTERED): 29. FORMATION TESTS
' NAME MD TVD Well Teste ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
SAG 10868' 8365' None
Shublik 10955' 8427'
Zone 4 10982' 8446'
(Top Ivishak
Sadlerochit)
Formation at Total Depth (Name):
30. List of Attachments: Pre Rig Work Summary, Summary of Daily Drilling Reports, Well Schematic Diagram.
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed Son Stewm ^,~~.. Title Drilling Technologist Date "" i ---~
PBU K-14 187-095 307-245 Prepared By NameMumber. Sondra Stewman, 564-4750
Well Number Drilling Engineer: Sean McLaughlin, 564-4387
Permit No. / A royal No.
INSTRUCTIONS
GeNeaA~: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Keily Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28.
Irene 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 02/2007 Submit Original Only
Digital Well File • • Page 1 of 2
Well: K-14
Well History
Well Date
K-14 9/5/2007
K-14 9/6/2007
K-14
Summary
**`WELL S/I ON ARRIVAL"** (post nao/ pre ctd)
JOB POSTPONED DUE TO CO-REP
***WELL S/I ON DEPARTURE***
(Pull BPV) Pulled CIW 4 1/16" Type "H" BPV "'JOB COMPLETE**'
BPV left in hole after RWO on 08/14/07, Slickline P.E. called in.
NOTE: Slickline up next.
9/6/2007 ***WELL S/1 ON ARRIVAL*'* (post naof pre ctd)
ASSIST VECO IN REMOVING BPV.
PULLED B&R FROM 10,376' SLM.
PULLED STA# 4 DCR GLV @ 3416' SLM.
SET RK-DGLV IN STA# 4 @ 3416' SLM.
***CONTINUED ON 9/7/07***
K-14 9/6/2007 Pulled 4" CIW for Post Rig
K-14 9/7/2007 **`CONTINUED FROM 9/6/07*" (post rwo/ pre ctd)
MIT-IA TO 3000, PASSED. BLED IA TO BACK TO 0 PSI.
PULLED 4 1/2" RHC PLUG BODY @ 10,376' SLM.
RAN 10' x 3" & 3.5" P-BAILERS MULTIPLE TIMES TO 10,580' SLM. RECOVER 1/2 GALLON OF RIG
DEBRIS. SEE LOG FOR DETAIL.
MADE 2 ATTEMPTS TO PULL XXN PLUG @ 10,580' SLM, UNABLE TO LATCH UP.
***CONTINUED ON 9/8/07 WSR***
K-14 9/8/2007 ***CONTINUED FROM 9/7/07*** (post rwo/ pre ctd)
RAN 10' x 3" P-BAILER MULTIPLE TIMES TO 10,580' SLM, RECOVERED MUD AND METAL
SHAVINGS.
MADE 2 ATTEMPTS W/ 4.5" GR TO XXN PLUG @ 10,580' SLM, UNABLE TO LATCH.
RAN 3.50" TAPERED LIB TO 10,580' SLM, MARKS INCONCLUSIVE.
PLANTED RELEASABLE SPEAR IN XXN PLUG @ 10,580' SLM W/ 3.5" GR.
PULLED XXN PLUG @ 10,580' SLM, POOH W/ PLUG IN PROGRESS.
***CONTINUED ON 9/9/07***
K-14 9/9/2007 ***CONTINUED FROM 9/8/07***
PULLED 4 1/2" XXN PLUG @ 10,580' MD. **FISH NECK WAS MILLED AWAY FROM RIG***
RAN 20' x 3.70" DMY WHIPSTOCK, SAT DOWN @ 10,454' SLM, APPEARS TO BE UNIQUE O-SHOT,
UNABLE TO WORK PAST.
RAN 3.80" SWEDGE, BRUSH, & 3.70" G-RING TO XN-NIP @ 10,580' SLM. SEE SLIGHT BOBBLE @
10454' SLM, NEVER SAT DOWN.
RE-RAN 20' x 3.70" DMY WHIPSTOCK, SAT DOWN AGAIN @ 10,454' SLM. UNABLE TO WORK
PAST.
RAN 5' x 3.80" BAR-BELL TO XN-NIP @ 10,580' SLM. NO PROBLEMS.
RAN 10' x 3.80" BAR-BELL TO XN-NIP @ 10,580' SLM. NO PROBLEMS.
ATTEMPTED DMY WHIPSTOCK AGAIN, STILL SITS DOWN @ 10,454' SLM. UNABLE TO WORK
PAST. RIGGED DOWN.
***WELL LEFT S/l, PAD OP. NOTIFIED***
K-14 9/10/2007 *" WELL SI ON ARRIVAL***
DRIFTED W/ 17' X 3.65 O.D BAKER DUMMY PATCH DRIFT... UNABLE TO PASS 10,446' SLM
DRIFTED W/ 10' X 3.70 O.D DUMMY WHIPSTOCK DRIFT... UNABLE TO PASS SAME SPOT @
10,446' SLM. RDMO
*** WELL LEFT SI, PAD OP NOTIFIED ON DEPARTURE ***
K-14 9/15/2007 *"WELL SI ON ARRIVAL***
ON LOCATION TO VIDEO EVALUATE OBSTRUCTION AT 10446'.
FLUID LEVEL DEPRESSED WITH N2. VIDEO PERFORMED IN GAS ENVIRONMENT
POSSIBLE CEMENT SHEATH FOUND AT 10458'. LOG WITH VIDEO.
POOH, RDMO. WELL LEFT SI, NOTIFY PAD OPERATOR
FINAL WHP: 1500/250/0
***JOB COMPLETE***
K-14 9/30/2007 CTU # 9 w/ 23/8" CT. Mill Cement Sheath and XN nipple. MIRU, perform BOP test.
K-14 9/30/2007 CTU # 9 w/ 23/8" CT.MiII Cement Sheath and XN nipple. (Publish on Interact) M{RU. Perform BOP
test........
http://digitalwellfile.bpweb.bp.com/WIInfo/Reports/ReportViewer.aspx 12/13/2007
Digital Well File • • Page 2 of 2
K-14 9/30/2007 CTU # 9 w/ 2 3/8" CT.MiII Cement Sheath and XN nipple. (Publish en Interact) MIRU. Perform BOP test.
MU Left Hand 2 7/8" motor, 3.795" prabiloc DSM. Perform kill/fluid pack w/ 1 % KCL w/ safelube. Begin
RIH. Continued on 10/1/07 WSR.
K-14 9/30/2007 CTU # 9 w/ 2 3/8" CT.MiII Cement Sheath and XN nipple. (Publish on Interact) MIRU. Perform BOP test.
MU Left Hand 2 7/8" motor, 3.795" prabiloc DSM. Perform kill/fluid pack w/ 1 %KCL w/ safelube. Begin
RIH. Continued on 10/1/07 WSR.
K-14 10/1/2007 Continued from 09/30/07 WSR. CTU #9, w/ 2 3/8" CT. Broadcasting. Complete killing/fluid packing well
w/ 210 bbl. RIH w/ LH 3.795 DSM. Run through cement sheath, Dry tag XN nipple @ 10572' CTM. Begin
milling from 10570'. Mill through XN w/ 2 stalls. Continue through tail. Make 3 passes between 10580'
and 10400'. Good. Dry drift multiple passes from 10400'- 10580'. Make last mill pass down from 10400-
10580', dry drift up, good. POOH. MU &RIH 3 5/8" OD WS drift to 11,300'. POOH, freeze protect tubing
to 2500' with 50/50 methanol. Leave well shut in. Drift portion of job complete.
K-14 10/1/2007 Continued from 09/30/07 WSR. CTU #9, w/ 2 3/8" CT. Broadcasting. Complete killing/fluid packing well
w/ 210 bbl. RIH w/ LH 3.795 DSM. Run through cement sheath, Dry tag XN nipple @ 10572' CTM. Begin
milling from 10570'. Mill through XN w/ 2 stalls. Continue through tail. Make 3 passes between 10580'
and 10400'. Good. Dry drift multiple passes from 10400'- 10580'. Make last mill pass down from 10400-
10580', dry drift up, good. POOH.
K-14 10/6/2007 T/1/O = 420NACNAC. Temp = SI. Bleed WHPs to 0 psi (pre CTD). No flowline. Bled TBGP from 420 psi
to 0+ psi in 1 hour 45 min. Final WHPs 0+/VACNAC.
K-14 10/7/2007 T/IIO = SSVNACNAC. Temp = SI. Monitor (pre CTD). No flowline. IAP & OAP unchanged overnight.
K-14 10/22/2007 T/I/0= 70/vac/vac. Temp= SI. Monitor WHPs (Pre-CTD).
K-14 10/23/2007 T/I/0=70NacNac. Temp=Sl. Bleed TP to 0 psi (pre- CTD). TBG FL @ 36'. Bled TBGP to bleed tank from
70 psi to 0 psi in 30 min. Monitor for 30 minutes. TBGP increased to 45 psi. Bled TBGP from 45 psi to 0
psi in 15 min. Monitored 30 min. TBGP increased 45 psi. Bled TBGP to 0 psi in 15 min, maintained open
bleed for 1 hr. Monitored 30 min. TBGP increased 20 psi. Bled TBGP to 0 psi in 15 min, maintained open
bleed for 1 hr. Monitored 1 hr. TBGP increased 10 psi. Maintained open bleed for 2 hr. Monitored 1 hr.
WHPs=O/VacNac.
K-14 10/24/2007 T/I/0= ONACNAC. Temp= SI. Monitor WHP's (pre CTD). Well house and flowline removed.
K-14 10/25/2007 Set 4" CIW "H" BPV.
Print Date: 12/13/2007 Page 1 of 1
http://digitalwellfile.bpweb.bp.com/WIInfo/Reports/ReportViewer.aspx 12/13/2007
•
L'
BP.EXPLORATION. Page 1 of8
..Operations Summary Report
Legal Well Name: K-14
Common Well Name: K-14 Spud Date: 9/10/1987
Event Name: REENTER+COMPLETE Start: 11/7/2007 End: 11/17/2007
Contractor Name: NORDIC CALISTA Rig Release: 11/17/2007
Rig Name: NORDIC 1 Rig Number: N1
.Date From - To Hours Task Code NPT Phase Description of Operations
11/8/2007 11:00 - 14:00 3.00 MOB P PRE Prep rig to move to K-14A
14:00 - 14:30 0.50 MOB P PRE
14:30 - 15:30 1.00 MOB P PRE
15:30 - 16:00 0.50 MOB P PRE
16:00 - 20:00 4.00 MOB P PRE
20:00 - 20:30 0.50 MOB P PRE
20:30 - 00:00 3.50 BOPSU P PRE
11/9/2007 00:00 - 01:30 1.50 BOPSU P PRE
01:30 - 01:45 0.25 RIGU P PRE
01:45 - 02:50 1.08 RIGU P PRE
02:50 - 04:30 1.67 RIGU P PRE
04:30 - 04:40 0.17 RIGU P PRE
04:40 - 05:03 0.38 RIGU P PRE
05:03 - 05:30 0.45 RIGU P PRE
05:30 - 07:30 2.00 RIGU N PRE
07:30 - 08:30 1.00 RIGU P PRE
08:30 - 12:00 3.50 RIGU P PRE
12:00 - 12:25 0.42 STWHIP P WEXIT
12:25 - 12:45 0.33 ZONISO N WEXIT
12:45 - 12:55 0.17 ZONISO N WEXIT
12:55 - 13:10 0.25 ZONISO N WEXIT
13:10 - 15:00 1.83 ZONISO P WEXIT
15:00 - 16:40 1.67 ZONISO P WEXIT
16:40 - 17:00 0.33 ZONISO P WEXIT
17:00 - 18:22 1.37 ZONISO P WEXIT
18:22 - 19:55 1.55 ZONISO P WEXIT
19:55 - 20:10 0.25 ZONISO P WEXIT
20:10 - 00:00 3.83 ZONISO N WEXIT
11/10/2007 00:00 - 03:00 3.00 WHIP P WEXIT
PJSM for rig move
Move rig from K-08 to K-14
Align rig and spot over K-14 RIG ACCEPTED ON K-14A @
16:00
Dress cellar, install hardline into reel, continue to spot
equipment, remove tree cap, NU BPOE
Fill stack, PJSM for BOPE testing
BOPE test, 250 psi Low - 3500 psi High - AOGCC notified -
witness test waived by Chuck Sheve
BOPE Test 250 psi low / 3500 psi high
PJSM for pulling coil from reel throught horses head and
injector
Pull coil to injector/ roller slightly out of adjustment, fix roller,
cont. pulling coil through injector
Stab into injector, stuffing box, connect hydraulic lines, recut
coil, protect eline, pump 5 bbl McOH
Filling coil
Test inner reel valve
Slack management, pumped 40 bbls, got it to move a couple
times on first pump up at 4.2 bpm.
Cut 55' of coil, 10' Eline
Repair SLB injector packoff. Probably damaged by being
pressurized, thinking coif was lower in the stuffing box then it
actually was.
RU and test lubricator to 1000 psi. Pull BPV. LD lubricator.
Cut coil and E line. Megar E line. Install coil connector and pull
test CTC. MU Baker MHA.MU nozzel.
RIH wo pump to 2100' O-ring on injector leaking
POH.
Install new O ring.
RIH to 2100'.
Continue to RIH. No returns. until 10900' then only speratic
returns. Up Wt at 11000'. 56K Continue RIH to 11700 Pump 5
bbl Hi Vis Bio pill .
POH laying in 30 additional bbl of pill. Lost 60 bbl before we
had fluid to surface.POH to 6600.
Flo Check . A few burbs but no flo.
POH to surface
PU Baker Thru tubing Whipstock, CoilTrak
Circulate 6bbl at surface before returns (Fluid level 260' down
in 5-1/2" tubing).
Repair SLB injector, 3 -SLB mechanics working to adjust
gripper position and tension
RIH with whipstock OA=O, IA= 0, WHP=44, PVT=218 bbl, 0.53
bpm in, 0.93 bpm out, tubing speed 85 fpm
Printed: 12/4/2007 8:53:40 AM
•
BP EXPLORATION Page 2 of 8
Operations Summary Report
Legal Well Name: K-14
Common Well Name: K-14 Spud Date: 9/10/1987
Event Name: REENTER+COMPLETE Start: 11/7/2007 End: 11/17/2007
Contractor Name: NORDIC CALISTA Rig Release: 11/17/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of operations
11/10/2007 03:00 - 03:22 0.37 WHIP P WEXIT Begin tie-in at 10,970 and end at 11,031. Add 5.5' to SLB coil
depth measurement. RIH to 11237.5 (bottom of WS -length of
WS 17.5- TOWS at 11220'MD') Circulating .5 bpm/900 psi.
Orient WS to high side. Close EDC. Check up weight
03:22 - 03:43 0.35 WHIP P WEXIT Bring up pump to 3400 psi, pressure dropped to 2000 psi. Kill
pump. Set down, tag WS. POOH seems to be pulling heavy.
Pull up 150'. Decide to go back and tag TOWS. WS tagged
spot on at 11220 with DWOB showing good set.
03:43 - 06:45 3.03 WHIP P WEXIT POOH pumping at tbpm, might be losing a 0.1 bpm, but hole
looks pretty tight. PVT = 248 b, OA=O, IA=10, WHP=22, Cir
Press 1176, pulling a bit heavy at 51 fpm ,(chrome tubing). POH
to serface
06:45 - 07:30 0.75 WHIP P WEXIT LD WS setting tools.
07:30 - 09:00 1.50 WHIP P WEXIT LD Baker MHA.Cut coil due to flat spotting. Intatll new coil
dimple connector. MU SLB wire Anchor. Pull test to 38K, PT to
4500 psi.
09:00 - 09:15 0.25 ZONISO P WEXIT MU cementing stinger.
09:15 - 11:30 2.25 ZONISO P WEXIT RIH.Tag WS @ 11221 and Paint flag. Up Wt 51 K.
11:30 - 11:45 0.25 ZONISO P WEXIT PJSM for cement job.
11:45 - 13:50 2.08 ZONISO P WEXIT Circulate .6 BPM @ 960 psi. Pump 5 bbl H2O. PT cementers
to 3700 psi. Pump 30 bbl 1/1 returns. Pump 5 H2O. Swap to
Bio. Displace with rig pump 2..37 bpm /2.34 bpm @ 2220 psi.
Circulate to nozzel. Shut in backside Bullhead @ 2.25 bpm @
2820 psi 13 bbl away WH Presssure increase to 2400-2600.
After 28 bbl Open backside and circ 1.5 bpm @ 1400 psi, Lay
in 2bbls PU to 10600'. Break circulation to assure well is fluid
packed.
Pressure well to 500 psi with 1.1 bbls
Pressure well to 677 psi with 1.2 bbls
Pressure well to 1177 psi with 1.9 bbls
Pressure well to 1600 psi with 2.9 bbls
Pressure well to bleed off to 1223 psi in 10 min. = 2.6 ppg
EMW got back 1.9 bbls .One bbl squeezed away
13:50 - 15:10 1.33 ZONISO P WEXIT Wash to top of WS. Circualte bottoms up.2.52 bpm @ 2200
psi. TAg WS at 11221.
15:10 - 18:00 2.83 ZONISO P WEXIT POH
18:00 - 18:15 0.25 ZONISO P WEXIT Flo Check
18:15 - 19:25 1.17 ZONISO P WEXIT Lay out SLB wireline anchor, anchor screw stripped, tap out,
cut 5' coil, MU SLB coil connector
19:25 - 20:42 1.28 ZONISO P WEXIT Headup eline coil, pump to assure coil not frozen, pressure test
CT connector
20:42 - 21:40 0.97 STWHIP P WEXIT PU Milling BHA, Stab over well, Surface Test MWD
21:40 - 23:30 1.83 STWHIP P WEXIT RIH, PVT=273 bbl @ start of TIH, Tubing Speed = 107 fpm,
flow in 0.26 bpm, flow out = .85 bpm, Cir Pressure = 635 psi,
OA = 0, IA=4, wellhead pressure = 18.
23:30 - 23:48 0.30 STWHIP P WEXIT Tie-in with gamma-ray. PVT=331 bbl, Tubing Speed 2 fpm,
flow in 0.22 bpm, flow out = .22 bpm, Cir press = 795, OA = 0,
IA=O, wellhead pressure = 18 psi. Add 2.3' to SLB depth for
tie-in.
23:48 - 00:00 0.20 STWHIP P WEXIT RIH to top of WS
11/11/2007 00:00 - 02:20 2.33 STWHIP P WEXIT Tag pinch point with low flow rate, PU 10', bring up pump to 2.7
bpm, Cir Press 2480 psi free spin, RIH 3 fpm, tag pinch point
Printed: 12/4/2007 8:53:40 AM
•
BP EXPLORATION Page 3 of 8
Operations Summary Report
Legal Well Name: K-14
Common Well Name: K-14 Spud Date: 9/10/1987
Event Name: REENTER+COMPLETE Start: 11/7/2007 End: 11/17/2007
Contractor Name: NORDIC CALISTA Rig Release: 11/17/2007
Rig Name: NORDIC 1 Rig Number: N1
Date From - To Hours Task Code NPT Phase Description of Operations
11111/2007 00:00 - 02:20 2.33 STWHIP P WEXIT @ 11,224.1' ,multiple tries w/ hard stalls (2500 up to 3800 psi)
like hanging up uphole then release with a quick slide the last
couple of feet down the whipstock. PVT = 328 bbl, IA=250 psi,
OA=O psi, WHP=50 psi, Flow in 2.5 bpm, flow out 2.52 bpm
02:20 - 03:00 0.67 STWHIP P WEXIT Park at 11224.0 until DWOB starting to take a little weight so
start of milling at 11224.1, free spin = 2660 psi, milling = 2780
psi. DWOB 0.64K Ib, PVT = 315 bbl, IA=262 psi, OA=O psi,
WHP= 51 psi.
03:00 - 04:24 1.40 STWHIP P WEXIT Milling 11225.0 - 11226.0 MD, PVT=315 bbl., Cir press = 2812
psi, 2.72 bpm in, 2.77 bpm out, OA=O, IA=366, WHP= 51,
DWOB increase from .64K to 2.5K over the 1' of milling.
04:24 - 05:32 1.13 STWHIP P WEXIT Milling 11226.0 - 11227.0, PVT=315 bbl., Cir press = 2809 psi,
2.72 bpm in, 2.77 bpm out, OA=O, IA=420, WHP= 48, DWOB
2.7K
05:32 - 06:25 0.88 STWHIP P WEXIT Milling 11227.0 - 11228.0, PVT=315 bbl., Cir press = 2809 psi,
2.72 bpm in, 2.77 bpm out, OA=O, IA=420, WHP= 48, DWOB
2.7K
06:25 - 07:00 0.58 STWHIP P WEXIT Milling 11228.0 - 11229.0, PVT=316 bbl., Cir press = 2870 psi,
2.72 bpm in, 2.77 bpm out, OA=O, IA=470, WHP= 48, DWOB
2.8K
07:00 - 11:00 4.00 STWHIP P WEXIT Milling 11230.0 - 11232, PVT=315 bbl., Cir press = 2830 psi,
2.75 bpm in, 2.77 bpm out, OA=O, IA=528, WHP= 48, DWOB
2.11 K Broke out in open hole at 11232.
11:00 - 13:00 2.00 STWHIP P WEXIT Drill 10 open hole .2.79/2.78 bpm at 3060 psi. Drill to 11244.7
13:00 - 14:15 1.25 STWHIP P WEXIT Backream to 11219. Three passed OK. 2.5/2.5 bpn at 2424psi.
Shut down pump .Dry tag OK.
14:15 - 14:40 0.42 STWHIP P WEXIT Swap well to Flo Pro .Circulate Flo Pro to Bit.
14:40 - 17:00 2.33 STWHIP P WEXIT POH swapping to Flo Pro.POH to 1459'
17:00 - 17:20 0.33 STWHIP N RREP WEXIT Replace peanut on injector chain.
17:20 - 18:00 0.67 STWHIP P WEXIT Continue to POH to surface.
18:00 - 18:50 0.83 STWHIP P WEXIT LD window milling assy .Window mill 3.74 No Go, String mill
3.78 No Go.
18:50 - 22:00 3.17 STWHIP N SFAL WEXIT Tee off hydraulic pump line at SLB power pack to reel for
greater volume, adjusting injector skates, pipe straightener and
gooseneck, rotate stuffing box 180 degrees
22:00 - 22:45 0.75 DRILL P PROD1 MU Build BHA #5 with 4.125 BC bit, 3.1 degree mtr, coil trak
tools, SLB dipple CTC
22:45 - 00:00 1.25 STWHIP N SFAL WEXIT Replacing sheared cotter pins on injector
11/12/2007 00:00 - 02:00 2.00 DRILL P PROD1 RIH with build BHA #5 to 10868'
02:00 - 03:50 1.83 DRILL P PROD1 Madd Pass and tie-in from 10868' to 11030' at 110fph, .53bpm,
1~l ~J~ ~ ~~ - (~ ~ 1200psi, Correction SLB .2', Baker .6'
- 2.50 DRILL P PROD1 Dir Drill from 11247' - 11440', TF at 50-100L, 2.60/2.59bpm,
3660psi, FS 3310psi, 2.60psi, rop 100-140fph, ECD 10.07ppg,
pvt 273-285bb1s, IA 150-300psi. Drill to 11440 EOB. UP Wt
45K.
06:20 - 09:15 2.92 DRILL P PROD1 POH for lateral BHA.
09:15 - 10:45 1.50 DRILL P PROD1 Dial downmotor from 3.1 to 1.2. Bit 1:1.
10:45 - 13:15 2.50 DRILL P PROD1 RIH to 11250'.
13:15 - 13:20 0.08 DRILL P PROD1 Log tie-in to RA tag in WS. Correction +1' MWD.
13:20 - 13:25 0.08 DRILL P PROD1 RIH to TD
13:25 - 15:30 2.08 DRILL P PROD1 Drill 2.4 / 2.42 bpm @ 3130 psi.FS, Having vibration issues.
Adjust pump rate.To 1.98 /1.98 bpm @ 2700 psi, 2460 psi FS,
W06.8K,Rop 75,
Printed: 12/4/2007 8:53:40 AM
WFJrLHEAA~ MCEVOY
ACTUATOR= AXELSON
KB. ELEV = 53.20'
BF. ELEV = 25.62'
KOP = 2055'
Max Angle= '
Datum MD = 1158T
Datum ND= 8800'SS
•as~a;
2023' X Nipple tD = 3.813
GAS LIFT MANDRELS
13-3/8" CSG, 72#, L-80, ID= 12.347" 2719'
TOP of 7" Lnr 3968'
~ 11 a^ i 2. --~~..
Minimum ID = ~. tit ~ ~ ` '
" .. ~" ~~
TOPOF7" LNR 1--{ 0567'
~ 4-112" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" ~~ 10622
9-5/8" CSG, 47#, L-80, ID = 8.681" ~~ 10827'
PERFORATION SUMMARY
REF LOG: BHCS ON 09/26/87
ANGLE AT TOP PERF: 49 @ 11508
Note: Refer to Roduction DB for historical pert data
SQE SPF INTERVAL OpnlSgz DATE
2" 6 12475-12625 Op~r 1liivi~
PBTD 11756'
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 11$00'
3
~~ ~
ST MD ND DEV NPE VLV LATCH PORT DATE
4 3104 38 OTIS RA
3 7517 45 OTIS RA
2 10237 46 OTIS RA
1 10345 46 OTIS RA
10484' TBG SEAL ASSY SBR
(}-f~~''€~' 'E('Tii.3 rich'., ';i~,r3
10500 9-5/8" X 4-1/2" TNV PKR
10547' 4-1/2" OTIS X NIP, ID = 3.813"
~
f- ~ ,~r.
10rJ86' 4-1 /2" OTIS XN NIP, ID = 3.725"
10622 4-1 /2" TBG TAIL ID = 3.958"
10626 ELMD TT LOGGED 10/30/87
10975' 7" MARKER JOINT
11"6 fib(}` °I"txa; rtt
I .«-""'~ 3-112" x
~~
3 '..~" x ;1-;1116" ~ ~--
11730' ~-i FISH - KINLEY CUTTER
DATE REV BY COMMENTS DATE REV BY COMMENTS
09/30/87 ORIGINAL COMPLETION
07/16/01 RN/KAK CORRECTIONS
11/16/02 AS/KAK PERFCORRECTIONS
08/16/03 CMO/TLP KB ELEV AND MAX ANGLE
08/16/03 JLA/KK WANER SAFETY NOTE
f1116I0! GJS C;'~ ,;: {_1~6A}
PRUDHOE BAY UNf>-
WELL: K 1 AA
PERMIT No: 2671330
API No: p-02: 2
SEC 4, Ti 1 N, R14E, 1909' FNL & 4106' WEL
BP Exploration (Alaska)
· STATE OF ALASKA . ~f1t7 RECEIVED
ALASKA OIL AND GAS CONSERVATION COM SION SEP 0 72007
REPORT OF SUNDRY WELL OPERATIONS
,Alaska Oil & Gas Cons. COOlmission
1. Operations Performed: JinCnorage
o Abandon 181 Repair Well / o Plug Perforations o Stimulate o Re-Enter Suspended Well
o Alter Casing 181 Pull Tubing/ o Perforate New Pool o Waiver o Other
o Change Approved Program o Operation Shutdown o Perforate o Time Extension
2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number:
BP Exploration (Alaska) Inc. 181 Development o Exploratory 187-095 -
3. Address: o Service o Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21752-00-00 -
7. KB Elevation (ft): 53.2' 9. Well Name and Number:
PBU K-14 -
8. Property Designation: 10. Field / Pool(s):
ADL 028303 Prudhoe Bay Field / Prudhoe Bay Pool -
11. Present well condition summary
Total depth: measured 11800 I feet
true vertical 8992 I feet Plugs (measured) 10556
Effective depth: measured 11756 . feet Junk (measured) 11730
true vertical 8964 - feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 110' 20" 110' 110'
Surface 2720' 13-3/8" 2720' 2678' 4930 2670
Intermediate 1 0830' 9-518" 10830' 8338' 6870 4760
Production
Liner 1226' 7" 10567' - 11800' 8151' - 8992' 7240 5410
Scab Liner 6499' 7" 3968' - 10467' 3611' - 8081' 7240 5410
SCANNED SEP 2 7 2007
Perforation Depth MD (ft): 11575' - 11697'
Perforation Depth TVD (ft): 8846' - 8925'
Tubing Size (size, grade, and measured depth): 4-112", 12.6# 13Cr80 Surface - 10435'
4-1/?" 1? Pdt I-RO 1 nAR':1.' _ 1 nR??'
Packers and SSSV (type and measured depth): 7" x 4-1/2" Baker 'S-3' packer; 10348';
9-5/8" x 4-1/2" TIW packer 10501 '
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment description including volumes used and final pressure:
Cut and pull tubing from -10463'. Run 7" (26#, L-80) Scab Liner (tied into old tubing with Unique Overshot). Cement w/195 Bbls
Class 'G' (1095 cu ft /944 sx). Run new Chrome completion. (This work was done in preparation for CTD sidetrack scheduled for late 2007.)
13. Representative Dailv Averaae Production or Injection Data
Oil-Bbl Gas-Met Water-Bbl Casina Pressure Tubina Pressure
Prior to well operation:
Subsequent to operation:
14. Attachments: 0 Copies of Logs and Surveys run 15. Well Class after work:
181 Daily Report of Well Operations o Exploratory 181 Development o Service
16. Well Status after work:
181 Well Schematic Diagram 181 Oil o Gas o WAG DGINJ OWINJ o WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUndry Number or N/A if C.O. Exempt:
Contact Howard West, 564-5471 307 -247
Printed Name Terrie Hubble Title Technical Assistant
Signature /(Ó ~ ~ 09 ~ 0 Prepared By Name/Number:
Phone 564-4628 Date 07 0 7Terrie Hubble, 564-4628
Form 10-404 Revised 04/2006
1 R. \ () N A L. RBDMS Bfl, SEP 2 5 2007 ~ I if-'-\
29;?~7
Digital Well File
Well: K-14
Well History
Well
Date
7/24/2007
K-14
K-14
7/24/2007
K-14
7/24/2007
K-14
7/25/2007
K-14
7/27/2007
K-14
7/27/2007
K-14
7/28/2007
K-14
7/28/2007
K-14
7/29/2007
K-14
7/30/2007
K-14
7/30/2007
Print Date: 9/7/2007
.
.
Page 1 of 1
Summary
****Continued from 07-23-07 WSR**** Assist Slickline (RWO Prep) Pumped 250 bbls crude down TBG.
FWP=200/6010
T/I/O= 250/6010 Assist Slìcklìne MIT TBG PASSED @ 3000 psi. (Shut in)(Pre RWO)
Had to Call Grease Crew to Service Wing. TBG pressured up wI total of 15.2 bbls Meth pumped. 1 st test
TBG lost 160 psi 15 min. wI total loss of 240 psi in 30 min. SL PE's wanted 2nd Test. 2nd Test TBG los
80 psi in 15 min. wi total loss of 100 psi in 30 min. Wing Taggd wi MIT TBG Info. Slickline in Control of
Well when we left. Wing is Closed. IA & OA valves are Open. Final WHP's=360/6010
***WSR CONTINUED FROM 7/24/2007***
LOADED TBG WITH 250 BBLS CRUDE.
DRIFTED WITH 3.80" G.RING TO XN NIPPLE @ 10,556' SLM.
SET 41/2" XXN PLUG WITH 4 x 1/8" & 4 x 3/16" EQUALIZING PORTS @10,556' SLM.
RÁN CHECK SET TO 10,556' SLM (sheared). MII-l PASSED W/PLUG IN I-'LACI::: (3UUUpsi)
****IN THE PROCESS OF DUMP BAILING SLUGGITS, WSR CONTINUED ON 7/25/2007****
***WSR CONTINUED FROM 7/24/2007***
DUMP BAILED 100LBS OF SLUGGITS ON TOP OF 4-1/2" XN TT PLUG AT 10,556'SLM.
****RDMO, LEFT WELL SIIN wm PLUG / NOTIFIED DSO OF WELL STATUS****
**** WELL SHUT IN ON ARRIVAL ****
RIH WITH STRINGSHOT. LOW ORDER DETONATION ONLY.
RIH WITH SMALL TUBING PUNCHER.
**** JOB CONTINUED ON 28TH JUL ****
TI1I0=300/6010 Assist E-Line w. Circ out. (RWO Prep) Road to location. Stand by for SLB to make run.
****Continued on 07-28-07 WSR****
****Continued from 07-27-07 WSR**** Assist E-Line wlCirc out (RWO Prep) Brought TBG pressure up to
2000 psi with 2 bbls crude. Held pressure while E-Line shot punches in TBG to IA. Bled back 2 bbls
crude. Pumped 10 bbls neat meth followed by 283 bbls of SW down lA, up TBG taking returns to the
flowline.
***TBG, IA & F.L. are not freeze protected due to upcoming eirc. out*** FWP's=220/18010
**** JOB CONTINUED FROM 27TH JUL ****
SHOT 2' TUBING PUNCH FROM 10436- 10438' WITH 2000 PSI SURFACE INDUCED WHP
RIH WITH 2X 12' STRINGSHOT TO 10535', MAX O.D. = 1.6875". SHOT STRINGSHOT FROM 10450' -
10462'.
RIH WITH CHC TO 10535', MAX OD. 3.625", CUT 4.5" TBG AT 10460'.
***FINAL WHP'S: 150/15010 PSI***
PAD OP NOTIFIED UPON DEPARTURE.
T/I/O=100/14010 Load TBG & lA, MIT-OA to 1000 psi. ****PASS**** (Pre RWO) Pumped 5 bbls of neat
meth, 400 bbls 9.8# Brine, and 12 bbls DSL down TBG. Pumped 5 bbls neat meth, 677 bbls 9.8# brine,
and 23 bbls DSL down IA. Flushed Jumper line with 2 bbls meth **Freeze Protected Flowline per WOA
procedure w. 5 bbls neat meth, 31 bbls crude and 5 bbls DSL **
MIT-OA to 1000 psi. PASS on 3rd test. Pumped 2.1 bbls of crude down OA to pressure up to 1000 psi.
OA lost 20 psi in 1 st 15 min and 10 psi in second 15 min for a total pressure loss of 30 psi over 30 min.
Bled OAP to 0 psi. ****Continued on 07-30-07 WSR****
****Continued from 07-29-07 WSR**** MIT-OA to 1000 PSI ****PASS**** (RWO Prep) Complete RD &
final paper work. FWP=O/O/O
T/IAlOA= 01010 Temp= SI PPPOT-T (PASS) PPPOT-IC (PASS) (Pre RWO)
PPPOT-T RU HP bleed tool onto THA test void, 0 psi. Cycle LOS "Standard" all moved free with no bent
pins one left in out position marked with tape. Pressured test void to 5000 psi for 30 minute test, 49501 15
minutes, 4950/30 minutes. Bleed THA void off to 0 psi, RD test equipment re installed Alemite test cap.
PPPOT-IC RU HP bleed tool onto IC test void 0 psi. Cycle LDS "Standard" all were in good condition. all
moved free with no bent pins. Pressured test void to 3500 psi for 30 minute test, 34001 15 minutes, 34001
30 minutes. Bleed IC test void off to 0 psi, RD test equipment re installed Alemite test cap.
Page 1 of 1
http://digitalwellfile.bpweb.bp .comIWIInfo/Reports/Report Vi ewer. aspx
9/7/2007
.
.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-14
K-14
WORKOVER
DOYON DRILLING INC.
DOYON 16
Start:
Rig Release:
Rig Number:
8/2/2007
8/14/2007
Spud Date: 9/10/1987
End: 8/14/2007
8/312007 07:30 - 08:30 1.00 MOB P PRE Begin moving the rig, but the GPB Fire Chief stopped the move
due to road work that ADW was performing on the Little Put
River crossing. Mike Callaway, ADW Field Drilling Egr
explained that this work would not hinder the movement of the
rig. Rig move resumed at 0830-hrs.
08:30 - 21 :00 12.50 MOB P PRE Move off DS 7, down Oxbow Road, left onto Point Macintyre
Road, left onto K-Pad Road, then left onto K-Pad. Set rig down.
Stop rig move due to crew hours. Crew coming from town
delayed due to flight delays.
21 :00 - 00:00 3.00 MOB P PRE Remove booster wheels.
8/4/2007 00:00 - 03:00 3.00 MOB P PRE Remove frame for booster wheels, Install BOP stack on
IPRE pedestal, Raise derrick and cattle chute.
03:00 - 10:00 7.00 MOB P UD Herculite and rig mats, spot and center over well K-14 and
level rig. Bob Noble with AOGCC called at 0830-hours to waive
State's right to witness the planned initial BOPE test for K-14.
10:00 - 12:00 2.00 RIGU P PRE Take on hot 9.8-ppg brine to Pits. R/U DSM Lubricator to tree
to pull BPV. Pressure test Lubricator to 150-psi. Check
pressures on OA and lA, OIO-psi. Tag BPV and tubing is on
vacuum. Engage and pull BPV. Test lines from manifold to tree
to 3,500-psi. Accept Rig at 1200-hours.
12:00 - 15:30 3.50 KILL P DECOMP Circulate 9.8-ppg brine down tubing to displace diesel and
well bore fluid out to the Slop Tank through the Gas Buster.
Took 25-Bbls to catch up to fluid in the tubing, which put the
fluid level at -1,080'. Recovered about 50-Bbls of diesel and
sent it to GC2 for recycle. The OA pressure climbed to 700-psi
during the Well Kill, but bled off in seconds when the OA valve
was opened to the line connected as a bleed off to the Slop
Tank. Hold Pre-Spud meeting with Day Tour crew.
15:30 - 16:00 0.50 KILL P DECaMP Monitor well for 30-minutes and prepare to P/U dry rod and RIH
with TWC.
16:00 - 16:30 0.50 WHSUR P DECOMP Cameron Tech, P/U TWC and dry rod it into hanger profile.
16:30 - 18:00 1.50 WHSUR P DECOMP Pressure test TWC from below and it takes fluid at 1-2-BPM
and 500-1000-psi. Test from top to 3,500-psi; check for leaks in
valves and tree. Holds rock-solid for 10 charted minutes.
18:00 - 20:00 2.00 WHSUR P DECOMP N/D tree and adaptor flange and remove from cellar.
20:00 - 21 :00 1.00, WHSUR P DECaMP Clean and prep wellhead. Check hanger threads. Threads
looked good, XO took 8 turns to make up. Function lock down
screws.
21 :00 - 23:00 2.00 DECOMP NIU BOPE
23:00 - 00:00 1.00 DECaMP RIU BOP test assembly
8/5/2007 00:00 - 05:00 5.00 DECOMP Test BOPE, Choke Manifold, IBOP's and Floor Valves to 250
psi low and 3,500 psi high. Each test was held for 5 minutes.
AOGCC witness of test was waived by Bob Noble. Test was
witnessed by Doyon Toolpusher and BP WSL. Lower VBR's
failed with the 5 1/2" test joint.
05:00 - 09:00 4.00 DECOMP RID test assembly and drain BOP stack. Remove and replace
VBR.
09:00 - 11 :30 2.50 DECOMP Pump 9.8-PPQ brine into IA to obtain loss rate to the
Cretaceous leak. Pumped 27-Bbls to see fluid level after the
well had been SII for 13-1/2-hours; 2-BPH fluid loss rate with
FL at -616'. Resume testing BOPE. Perform Body test and it is
solid. P/U 5-1/2" test joint and RIH. It doesn't test. POH, UD
5-1/2" test jt and P/U 4" test jt---it tests solid. Call for another
Printed: 8/26/2007 1 :31 :37 PM
.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
8/5/2007
09:00 - 11 :30
11 :30 - 15:00
15:00 - 16:00
16:00 - 18:30
18:30 - 19:00
19:00 - 20:00
20:00 - 20:30
20:30 - 00:00
8/6/2007
00:00 - 04:30
04:30 - 06:30
06:30 - 08:00
08:00 - 08:30
08:30 - 10:00
10:00 - 11 :00
11 :00 - 13:00
.
K-14
K-14
WORKOVER
DOYON DRILLING INC.
DOYON 16
2!;fl!!4ff:'1 ·1
3.50 BOPSUFj P
I I
I I
1 Jopsu~ P
2.50 BOPSU1 P
I
0.50 BOPSUR P
1.00' PULL Ip
I
0.50 PULL IN
3.50 PULL IN
IN
I
N
N
Start:
Rig Release:
Rig Number:
Spud Date: 9/10/1987
End: 8/14/2007
8/2/2007
8/14/2007
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DECOMP
DPRB DECOMP
DPRB DECOMP
4.50 I PULL
2.00 PULL
1.50 PULL
DPRB DECOMP
DPRB DECOMP
DPRB DECOMP
0.50 PULL N
1.50 PULL N
1.00 PULL N
2.00 PULL N
¡DPRB
DPRB
DPRB
DECOMP
DECOMP
DECOMP
DPRB DECOMP
13:00 - 14:30 1.50 PULL N DPRB DECOMP
14:30 - 15:00 0.50 PULL N DPRB DECOMP
I
15:00 - 16:00 1.00 PULL N DPRB DECOMP
16:00 - 18:00 2.00 PULL N DPRB DECOMP
18:00 - 19:00 1.00 PULL N DPRB DECOMP
19:00 - 19:30 0.50 PULL P DECOMP
19:30 - 20:30 1.00 PULL P DECOMP
20:30 - 23:00 2.50 PULL P DECOMP
23:00 - 00:00 1.00 PULL P DECOMP
5-1/2" test joint from 4ES. Open VBR doors and inspect rams
but don't see anything apparent.
PIU second 5-1/2" test joint and RIH. Cannot get the VBRs to
seal on the 5-1/2" test joint. POH and PIU the 4" test joint and
RIH; it tests rock solid. Toolpusher called Hydril and they said
that this has been a recurring problem with their VBR rubbers.
Hydril recommended actuating the VBRs a few times against
3-1/2" pipe, then heating the elastomers in the VBRs with hot
water or steam.
Resume BOP testing and VBRs hold against the 5-1/2" test
joint. Complete BOPE testing at 1600-hours.
RID BOPE test equipment. Wait on DSM team to pull TWC.
They were called away from K-14 while awaiting the completion
of the BOPE tests.
RIU DSM lubricator and pull TWC.
M/U landing joint, BOLDS, attempt to pull hanger to floor.
Hanger came off seat at 135,000#. Tubing not pulling free, Pull
up to 260,000# still not free. Work pipe multiple times. Unable
to pull tubing. Took 39 bbls to fill hole. Discuss options with
well engineer.
Land tubing hanger, RILDS,
N/D flow riser and NIU shooting flange. Wait on Schlumberger
E-line unit.
Spot E-line unit, R/U wireline BOP's, lubricator extension and
grease head.
PJSM. MIU String Shot in cellar, MIU and test Lubricator.
RIH String Shot to 10,530' and make correlation runs. The
Pre-rig Chemical Cut at 10,460' was apparent on the CCL.
Fire String Shot. Electrical indication in the van of firing, but no
physical evidence at the surface.
POH with E-line String Shot assembly.
PJSM. Break off and UD the remains of the firing assembly.
Obvious evidence of successful firing.
Hold PJSMs for both rig crews for handling Chemical Cutting
equipment. Test fire firing head, okay. SWS crew in full body
PPE R/U Chemical Cutter in Cellar and PIU through floor and
into Schlumberger Lubricator. Connect Lubricator to extension
and prpare to RIH.
RIH SWS Chemical Cutter to 10,400'.
Make correlation passes from 10,550' to 10,300'. Park cutter at
10,463' and fire at 1447-hrs. Successful indications in van and
on rig floor.
POH with SWS E-line and the fired Chemical Cutter.
PJSM. B/O and UD fired Chem Cutter assembly and pressure
control equipment.
N/D shooting flange and NIU flow riser.
MIU landing joint, BOLDS and pull hanger to rig floor. Hanger
came off seat at 135,000#, tubing came free at 162,000#.
Circulate bottoms up 12.5 bpm at 1,020 psi. Loss rate 16 bph
while um ing.
UD 51/2", 17#, L-80, BTC tubing and dual encapsulated
control line. Recovered 24 clamps and 4 SS bands.
RID control line spooler.
Printed: 8/26/2007 1 :31 :37 PM
.
.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-14
K-14
WORKOVER
DOYON DRILLING INC.
DOYON 16
Start:
Rig Release:
Rig Number:
8/2/2007
8/14/2007
Spud Date: 9/10/1987
End: 8/14/2007
8/712007 00:00 - 07:00 7.00 I PULL P UD 5 1/2", 17#, L-80, BTC tbg and 41/2", 12.6#, L-80 BTC
tubing. UD a 22.74' long cutoff joint at 0700-hrs. Recovered
62-full joints of 5-1/2" buttress tubing, 197-full joints of 4-1/2"
buttress tubing, 4-GLMs, an SSSV, the Sliding Sleeve, all of
the double SS control lines, 4-SS bands, and 24-clamps.
07:00 - 07:30 0.50 CLEAN P DECOMP Clear and clean Rig Floor. RID tubing handling tools.
07:30 . 08:00 0.50 CLEAN P DECOMP P/U and install wear ring.
08:00 - 10:00 2.00 CLEAN P DECOMP P/U and M/U BHA: Dress-off Mill inside washover pipe, Boot
basket, 9-5/8" Scraper, Bumper Jar, Oil Jar, and 9-ea 4-3/4"
DCs.
10:00 - 18:30 8.50 CLEAN P DECOMP RIH with BHA #1 on 4" DP from Pipe Shed to 10,447'
18:30 - 19:00 0.50 CLEAN P DECOMP Establish parameters, Up weight 196,000#, Down weight
128,000#, Rotating weight 160,000#, 8,000 ft/lbs of torque at
40 rpm. Tag tubing stub at 10,461', wash over tubing stub to
10,470'. Was able to get over tubing stub with no problems.
19:00 - 20:30 1.50 CLEAN P DECOMP Circulate 20 bbl high-vis sweep around at 10 bpm with 2,600
psi.
20:30 - 22:00 1.50 CLEAN P DECOMP Slip and cut 89' of drilling line. Inspect and adjust drawworks
brakes.
22:00 - 00:00 2.00 CLEAN P DECOMP POOH standing back 4" DP to 6,763'
8/8/2007 00:00 - 01 :30 1.50 CLEAN P DECOMP POOH with BHA #1
01 :30 - 02:00 0.50 CLEAN P DECOMP Stand back DC's, UD BHA.
02:00 - 02:30 0.50 CLEAN P DECOMP Clear and clean rig floor.
02:30 - 04:00 1.50 CASE P TIEB1 R/U 7" casing handling equipment. Strap jewelry and place in
running order.
04:00 - 05:00 1.00 CASE P TIEB1 Hold PJSM with all personnel involved. P/U Unique overshot
assembly and dump 20/40 river sand on top of Type 2 landing
collar.
05:00 - 14:30 9.50 CASE P TIEB1 Run 157 total Joints of 7",26#, L-80, BTC-M casing. Using
Best of Life 2000 pipe dope. Average Torque -8150 ft-Ibs to
make up to mark. Free Floating Centrilizers on every joint. Fill
Liner every 5 joints. PJSM on Picking Up Liner Hanger. M/U
Baker Flex Lock Liner Hanger and HRD ZXP Liner Top Packer.
P/U Wt = 185,000 Ibs SIO Wt = 150,000 Ibs.
14:30 - 15:30 1.00 CASE P M/U 1 Stand of 4" DP and RIH. M/U Clrc Head. Clrc Liner
Volume at 5 bpm and 400 psi. PJSM on RIH wI Liner, Landing
and Spacing Out, PIU and M/U of Cement Head.
15:30 - 18:30 3.00 CASE P TIEB1 RIH wI 7" Liner on 4" HT 38 DP from Derrick.
18:30 - 19:30 1.00 CASE P TIEB1 M/U Baker Cementing head. Establish parameters up weight
265,000#, down weight 155,000#.
19:30 - 20:00 0.50 CASE P TIEB1 Tag top of tubing at 10,461', Slid over tubing stub, sheared pins
with 5,000#. Slacked off to NO/GO at 10469'. P/U to neutral
weight plus 2' to 10,467'
20:00 - 21 :00 1.00 CASE P TIEB1 Circulate at 5 bpm with 690 psi. Hold PJSM with all personnel
involved.
21 :00 - 23:30 2.50 CEMT P TIEB1 Pressure test lines to 5,000 psi, Batch up and pump 10 bbls of
15.8 ppg class G cement neat, 80 bbls of 15.8 ppg class G
cement with 1/4 Ib per bbl of CemNet, 105 bbls of 15.8 ppg of
Class G cement neat, kick out plug with 5 bbls of water.
Displaced with 280 bbls of 9.8 ppg Brine. Bumped plug. CIP @
23:15. Bled back and checked floats. Lost rate of 10 - 12 bph
while displacing.
Printed: 8/26/2007 1 :31 :37 PM
.
.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-14
K-14
WORKOVER
DOYON DRILLING INC.
DOYON 16
Start: 8/2/2007
Rig Release: 8/14/2007
Rig Number:
g~>1
TIE~-I Pressure up ~o set Baker FLEXLOCK " Hanger and ZXP
I Packer Saw surface indication of setting at 3,100 psi, continue
to pressure up to 4,500 psi. Slack off and bleed off pressure.
TIEB1 Release running tool from liner.
TIEB1 I Circulate out excess cement, 15 bpm with 3,000 psi. 5-6 bbls
~ of cement returns at surface.
i UD Baker cement head, Blow down and RID lines.
I POOH with liner running tool, standing back 4" DP.
, Make service breaks on liner running tool. UD liner running
,¡tOOl.
Pull wear bushing, M/U stack washing tool and flush BOP stack
'I and flow line.
M/U BHA #2, 6 1/8" Bit, 2 x Boot Baskets, 7" Csg Scraper, XO,
I Bumper Jar, Oil Jar, XO, 9 x DC's. Total BHA lenght = 311.24'
I RIH with 4" DP to 1,073'
. M/U HES RTTS. Set 1 stand below rig floor. Test RTTS to
'11,500 psi for 30 minutes. Good Test.
, Pull McEvoy 9 5/8" Pack Off, Pack Off pulled free with 25,000#.
'I' Installed new 9 5/8" Pack Off. RILDS and torque to 550 ft/lbs.
Plastic pack voids and test Pack Off to 3,800 psi for 30
I' minutes. Good test.
Retrieve RTTS and UD.
! RIH with BHA #2 on 4" DP to 10,307'. Did not see top of 7"
I scab liner.
, R/U and presure test 9 5/8" x 7" casinQ to 3.500 psi for 30
I minutes. Good test. -
Establish parameters, up weight 210,000#, down weight
120.000#, rotating weight 157,000#, 50 rpm and 10,000 ft/Ibs
of torque off bottom, 2,120 psi pump pressure with 8 bpm. Drill
cement and float equipment from 10,307' to 10,435' with
10,000 - 12,000# WOB, 80 rpm with 13,000 ft/lbs of rotary
torque, 2,860 psi pump pressure at 10 bpm. Saw Landing
collar at 10,352' Float collar at 10,395' and XO at 10,435'
Work 7" casing scraper from 10,360' to 10,423'. Work 6 times.
Displace 9.8 ppg Brine with 40 bbl high vis sweep followed by
8.5 ppg seawater. 2,040 psi pump pressure at 8 bpm.
Work 7" casing scraper from 10,360' to 10,310'. Work 6 times.
Pump dry job.
POOH standing back 4" DP to 4,484'
POOH standing back 4" DP from 4,484' to 311 '.
,Stand back DC's and UD 61/8" Drill Out assembly
I MIU BHA #3, 33/4" Junk Mill, Bit Sub, 6 x 27/8" PAC DP, XO,
XO, 2 x Boot Basket, XO, Bumper Sub, Oil Jar, XO, 9 x DC's.
Total BHA = 498.86'
RIH with BHA #3 on 4" DP.
Take Initial Parameters: P/U Wt = 225,000 Ibs; SIO Wt =
121,000 Ibs; Rot Wt = 157,000 Ibs at 50 rpms and 10,000 ft Ibs
torque. Tag Up on 4-1/2" x 7" XO at 10435'. Bring On Pumps
at 7 bpm and 1800 psi. Mill Cmt, Junk, and Wash Sand down
to Baker Type" Landing Collar at 10447'.
Mill on Baker Type" Landing Collar wi 0-3,000 Ibs Wt on Mill.
Once through make multiple passes to ensure Landing Collar
Milled Up. Pump 20 bbl High Visc Sweep
8/8/2007
8/9/2007 00:00 - 00:30 0.50 CASE P
00:30 - 01 :00 0.50 CASE P
01 :00 - 01 :30 0.50 CASE P
01 :30 - 02:30 1.00 CASE P
02:30 - 03:00 0.50 CASE P
03:00 - 05:00 ' 2.00 CASE P
05:00 - 06:00 1.00 DRILL P
06:00 - 06:30 0.50 DRILL P
06:30 - 07:30 1.00 DHB P
07:30 - 08:00 0.50 WHSUR P
08:00 - 09:00 1.00 WHSUR P
09:00 - 09:30 0.50 DHB P
09:30 - 13:30 4.00 DRILL P
113:30 - 15:00 1.50 CASE P
15:00 - 19:00 4.00 DRILL P
[19:00 - 19:30 0.50 DRILL P
19:30 - 21 :30 2.00 DRILL P
21 :30 - 22:00 0.50 DRILL P
22:00 - 00:00 2.00 DRILL P
8/10/2007 00:00 - 01 :00 1.00 DRILL P
01 :00 - 01 :30 0.50 DRILL P
01 :30 - 02:30 1.00 CLEAN P
102:30 - 06:30 4.00 CLEAN P
06:30 - 07:30 1.00 CLEAN P
07:30 - 09:00
1.50 CLEAN P
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
ITIEB1
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
TIEB1
CLEAN
CLEAN
CLEAN
CLEAN
Spud Date: 9/10/1987
End: 8/14/2007
Printed: 8/26/2007 1 :31 :37 PM
.
.
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-14
K-14
WORKOVER
DOYON DRilLING INC.
DOYON 16
Start:
Rig Release:
Rig Number:
8/2/2007
8/14/2007
Spud Date: 9/10/1987
End: 8/14/2007
Wash Down below landing collar to sluggits at 10576'. Make
Multiple Passes to ensure tubing is clean. Wash top two feet
of Sluggits to 10578'. Wash very easily - does not appear to be
junk.
10:30 - 11 :30 1.00 CLEAN P CLEAN Circulate 20 bbl High Visc Sweep and Chase out of hole at 9.5
bpm and 3180 psi.
11 :30 - 15:00 3.50 CLEAN P CLEAN POOH standing back 4" DP to 498'
15:00 - 16:30 1.50 CLEAN P CLEAN Stand back DC's, UD Mill assembly. Empty boot baskets,
recovered 1 gallon of sand, cement and metal cuttings.
16:30 - 17:30 1.00 CLEAN P CLEAN M/U BHA #4, RCJB, Bit Sub, Pump Out Sub, 6 x 2 7/8" DP,
XO, XO, 2 x Boot Baskets, XO, Bumper Sub, Oil Jar, XO, 9x
DC's. Total BHA Lenght = 504.24'
17:30 - 21 :00 3.50 CLEAN P CLEAN RIH with BHA #4 on 4" DP to 10,375'
21 :00 - 22:00 1.00 CLEAN P CLEAN Slip and Cut 90' of drilling line. Inspect drawworks.
22:00 - 22:30 0.50 CLEAN P CLEAN RIH to 10,471', MIU Top Drive, unable to circulate, POOH
back to 10,375'.
22:30 - 23:30 1.00 CLEAN P CLEAN Unable to circulate down pipe. R/U to reverse circulate. Get
, pipe unplugged. Reverse circulate DP volume. 3.5 bpm with
1,750 psi. Sand in returns at shakers.
23:30 - 00:00 0.50 CLEAN P CLEAN Pump 20 bbl high vis sweep at 5 bpm with 1350 psi.
8/11/2007 00:00 - 01 :30 1.50 CLEAN P CLEAN Wash down to 10,554' with 20 rpm and 8 bpm with 3,000 psi.
01 :30 - 02:30 1.00 CLEAN P CLEAN Drop ball, wash down with RCJB and tag up at 10,579'. P/U
and wash back down, set down with 4,000#, solid tag at
10,579'
02:30 - 03:30 1.00 CLEAN P CLEAN POOH to 10,467', drop dart and open circ sub. CBU at 12 bpm
with 3,200 psi. Pump dry job.
03:30 - 07:00 3.50 CLEAN P CLEAN POOH from 10,467' standing back 4" DP. Losinç¡ 3 bph
seawater.
07:00 - 09:00 2.00 CLEAN P CLEAN Stand back DC's, clean out junk baskets and rebuild pump out
sub. Recover 1/2 gallon of metal flakes from float equipment,
sand and cement in junk baskets, recovered 1 piece of metal
in RCJB, appx 1 1/2" round by 1/4" thick.
09:00 - 10:00 1.00 CLEAN P CLEAN Rerun BHA #4, RCJB assembly.
10:00 - 14:30 4.50 CLEAN P CLEAN RIH with 4" DP, filling pipe every 25 stands to 10,375'
14:30 - 15:30 1.00 CLEAN P CLEAN Wash and ream to 10,566', 6 bpm with 1,590 psi, 50 rpm with
12,000 ft/lbs of rotary torque. Pump 20 bbl sweep past BHA.
15:30 - 17:00 1.50 CLEAN P CLEAN Drop ball for RCJB. Wash to plug at 10,579'. 5 bpm with 1,890
psi. Pump 20 bbl sweep past BHA.
17:00 - 18:00 1.00 CLEAN P CLEAN Drop opening dart and circulate bottoms up at 10 bpm with
2,900 psi.
18:00 - 00:00 6.00 CLEAN P CLEAN POOH laying down 4" DP from 10,579' to 3,572'
8/12/2007 00:00 - 02:30 2.50 CLEAN P CLEAN POOH laying down 4" DP from 3,572' to 504'
02:30 - 04:00 1.50 CLEAN P CLEAN UD BHA, RCJB assembly. Recovered appx 1/2 gallon of
sluggets and sand in boot baskets, RCJB was empty.
04:00 - 04:30 0.50 CLEAN P CLEAN Clear and clean rig floor.
04:30 - 05:00 0.50 I BOPSU P CLEAN Pull wear bushing.
05:00 - 08:00 3.00; BOPSU P CLEAN Test BOPE to 250 psi low and 3,500 psi high pressure.
Choke Valve #1, 12, 13, 14, Upper IBOP, HCR Kill.
Choke Valve #9,11, Lower IBOP and Kill Manual.
Choke Valve #5, 8,10, and TIW.
Choke Valve #4,6,7 and Dart Valve.
Chaoke Valve #2.
Choke HCR.
Printed: 8/26/2007 1 :31 :37 PM
.
.
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-14
K-14
WORKOVER
DOYON DRilLING INC.
DOYON 16
3.00
2.00
10:00 - 11 :30
CLEAN
11 :30 - 13:00 1.50 BOPSU N CLEAN
13:00 - 13:30 0.50 BOPSU N CLEAN
13:30 - 15:00 1.50 BOPSU N CLEAN
15:00 - 16:00 I 1.00 BOPSU N CLEAN
16:00 - 16:30 I 0.50 BOPSU N CLEAN
16:30 - 18:00 1.50 BOPSU~ N CLEAN
i
I
18:00 - 19:00 1.00 BOPSUR N CLEAN
19:00 - 19:30
19:30 - 20:30
0.50 BOPSU
1.00 BOPSU
CLEAN
CLEAN
RUNCMP
20:30 - 22:00
RUNCMP
22:00 - 00:00
RUNCMP
8/13/2007
00:00 - 11 :00
RUNCMP
11 :00 - 13:00
13:00 - 13:30
0.50 RUNCO P
RUNCMP
13:30 - 16:30
3.00 I RUNCO P
RUNCMP
Start:
Rig Release:
Rig Number:
Spud Date: 9/10/1987
End: 8/14/2007
8/2/2007
8/14/2007
Manual Choke.
Found Leak attempting to test pipe rams on 4" Test Joint. Pull
Test Joint and attempt to test with blinds against Test Plug, still
leaking. Isolate tes pump and notice leak on chart from tes
pump. Pull and reset Test Plug, double block test pump to
pressure sensor.
Test Blind Rams and Choke Valve #3. Good Test. Pick Up
4-112" Test Joint and Attempt to Test Pipe Rams. Found Leak
attempt to test multiple times. Drain Stack and see leaking
over top of pipe rams. Will Need to replace rams.
PJSM, RID Test Equipment, Pull Test Plug, and Install Wear
Ring.
Gather up XO's and 6-1/4" DC's for setting RTTS Storm Packer
for barrrier requirements.
P/U nine 6-1/4" DC's, HES RTTS Storm Packer and DP. Set
RTTS below rig floor. Pull Out of hole with HES Setting Tool.
Rig Up Test Equipment. Pressure Test RTTS to 1500 psi for
30 min~ - goorl T ¡>c:t
Pull Wear Ring and set Test Plug. R/U and test Test Plug to
1500 psi for 10 charted minutes. Good Test.
Suck out BOP body and change out 2-7/8" x 5" Variable Pipe
Rams.
RIU test equipment and test VBR to 250 psi low pressure and
3500 psi high pressure with 4" and 4-1/2" Test Joints. Tests
held for 5 charted minute. Test witnessed by Doyon
Toolpusher and BPX WSL.
RID BOP testing equipment. RIU and pull Test Plug.
RIH with HES Retreiving Tool. Engage HES RTTS Storm
Packer and release. POOH, UD DP, DC's, and HES Storm
Packer.
PJSM. P/U Doyon TBG running equipment. R/U Torque Turn
equipment, TBG elevators, bales, and slips. Final check on all
Jewelry and TBG to RIH.
P/U and run 4-1/2" 12.6#, 13Cr, Vam Top Completion to 584'.
All TBG and Jewelry drifted before P/U. All connections
Torque Turned, average torque of 4440 ft-Ibs. Stabbing Guide
and "Jet Lube Seal Guard" used on all connections.
P/U and run 4-1/2" 12.6#, 13Cr, Vam Top Completion from
584' to 10399'. All TBG and Jewelry drifted before P/U. All
connections Torque Turned, average torque of 4440 ft-Ibs.
Stabbing Guide and "Jet Lube Seal Guard" used on all
connections.
Up Wt = 165,000 Ibs, Dw Wt = 105,000 Ibs. P/U Jt #243 and
tag at 37.5' in = 10436'. Confirm Tag. Pull Out #243 & 242
and UD. P/U 9.73' Space Out Pup for 2' Space Out above 7" x
4-1/2" XO. M/U Jt #242. M/U McEvoy Tbg Hanger and 4-1/2"
TCII Landing Joint. Land Tbg Hanger at 22.69 ft below Rig
Floor. RILDS
PJSM with Rig Crew, Mud Engineer, and Truck Drivers on
Displacement. PT Surface Lines to 4000 psi.
Displace well with 170 bbls of 140 degree Sw followed by 340
I ~:' of 140 d'gee, Sw w;th ,""",;00 ;oh;b;Io,. 3 bpm at 240
Printed: 8/26/2007 1 :31 :37 PM
.
.
legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
K-14
K-14
WORKOVER
DOYON DRilLING INC.
DOYON 16
Start: 8/2/2007
Rig Release: 8/14/2007
Rig Number:
Spud Date: 9/10/1987
End: 8/14/2007
19:00 - 19:30 0.50 BOPSU P
19:30 - 22:00 2.50 BOPSU P
22:00 - 00:00 2.00 WHSUR P
8/14/2007 00:00 - 01 :30 1.50 WHSUR P
01 :30 - 02:00 0.50 WHSUR P
02:00 - 03:00 1.00 WHSUR P
03:00 - 05:00 2.00 WHSUR P
05:00 - 06:30 1.50 WHSUR P
06:30 - 07:30 1.00 WHSUR P
07:30 - 09:30 2.00 WHSUR P
RID Clrc Equipment. Drop Ball and Rod. UD Landing Joint.
Close Blinds and Pressure Up on Tubing to 3500 psi for 30
mins to set packer and test tubing. Good Test. Bleed down
pressure to 1700 psi. Isolate Tbg and Pressure Up on
Annulus to 3500 psi and test for 30 mins. Good Test. Bleed
Off Tbg Quickly. Shear DCR Valve 2300 psi differential.
Pump both ways through Shear Valve to confirm open. 3 bpm
with 260 psi.
WHDTRE Set TWC with Cameron wellhead tech. Test from below to
1,000 psi and above to 3,500 psi for 10 minutes each on chart.
Good tests.
WHDTRE Suck out stack, RID lines. NID BOP stack and set back on
pedestal.
WHOTRE Prep wellhead, N/U McEvoy SSH tubing head adaptor flange
and test to 5,000 psi as per Cameron procedures. Good test.
WHDTRE N/U Tree. Test tree to 5,000 psi with diesel. Good test.
WHDTRE RID tubing tongs and compenstor.
WHOTRE R/U DSM lubricator and test to 500 psi. Pull TWC.
WHOTRE R/U Little Red Services, Pressure test lines to 3,500 psi. Pump
165 bbls of diesel freeze protect down IA at 2 bpm with 550 psi.
WHDTRE U-tube diesel freeze protect between IA and tubing.
WHOTRE Set BPV and tested from below to 1,000 psi for 10 minutes.
WHOTRE Blow down circulating lines, secure production tree, clean
cuttings tank. The Rig was released at 09:30 hrs on 8/14/2007.
Printed: 8/26/2007 1 :31 :37 PM
K-14 (PTD #1870950) Internal wai.cancellation
Regg, James B (DOA)
.
Page I of I
From: NSU, ADW Well Integrity Engineer [NSUADWWelllntegrityEngineer@BP.com]
Sent: Sunday, August 19, 20072:35 PM
To: Regg, James B (DOA); Maunder, Thomas E (DOA); Fleckenstein, Robert J (DOA); NSU, ADW Well Operations
Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, GC1 OTL; GPB, Area Mgr Central (GC1/3/FS3); GPB,
GC1 Wellpad Lead; GPB, Wells Opt Eng; GPB, Optimization Engr
Cc: NSU, ADWWelllntegrity Engineer; Subekti, Herry; NSU, ADWWI Tech
Subject: K-14 (PTD #1870950) Internal Waiver Cancellation
1?~11 ß!Z-1/D 7
All,
An internal waiver was issued for a PC leak on well K-14 (PTD #1870950) on 01/07/06. The rig placed and cemented a scab
liner over the PC leak on 08/14/07, thus restoring production casing integrity. The well is currently on the schedule for a CTD ,,/
sidetrack in October.
The well is reclassified as Operable. Please remove all waivered well signs and the laminated copy of the waiver from the
wellhouse.
Please call with any questions or concerns.
Thank you,
Andrea Hughes
Well Integrity Coordinator
Office: (907) 659-5102
Pager: (907) 659-5100 x1154
S~NED SEP 1 1 2007
8/29/2007
.
~V~VŒ (ID~ ~~~~æ~
.
AI,A~1iA OIL AlQ) GAS
CONSERVATION COltDlISSION
SARAH PAUN. GOVERNOR
333 W. 7th AVENUE. SUITE 100
ANCHORAGE. ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
David Reem
Engineering Team Leader
BP Exploration Alaska, Inc.
PO Box 196612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU K -14
Sundry Number: 307-247
SCANNED AUG 0 3 Z007
Dear Mr. Reem:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set Q.ut in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
DATED this ~ day of August, 2007
Enc!.
1'8-<1--0'1-6-
f}en- z.b 17
Wt/ STATE OF ALASKA .
ALASKA Oil AND GAS CONSERVATION COM SION
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25 280
~l'
RECEIVED
JUL .2 3 2007
t~laska Oil & Gas Cons Comm' .
. 15510
A
1. Type of Request: o Abandon o Suspend o Operation Shutdown o Perforate o Time Extension g'
o Alter Casing 181 Repair Well j 0 Plug Perforations o Stimulate o Re-Enter Suspended Well
o Change Approved Program 181 Pull Tubing o Perforate New Pool o Waiver o Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ~ Devélopment o Exploratory 187 -095 ."r
3. Address: D Service o Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21752-00-00 .
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU K-14 ".
Spacing Exception Required? DYes ~No ,
9. Property Designation: ... 110. KB Elevation (ft): 11. Field / Pool(s): /
ADL 028303 53.2' / Prudhoe Bay Field / Prudhoe Bay Pool
1.1:~¡iÄi»i+><ÄJ .... .....< ; ". .ci J II:r NDlllnN .J ii.. ". ';J>;.;'.;; (¿<..;i(i.... ;iii........;iii?
.r
Total Depth MD (ft): Total Depth TVD (ft):Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
11800 ~ 8992 11756 . 8964 None 11730
Casinn Lennth Size MD TVD Burst Collanse
Structural
Conductor 110' 20" 110' 110'
Surface 2720' 13-3/8" 2720' 2678' 4930 2670
Intermediate 10830' 9-5/8" 1 0830' 8338' 6870 4760
Production
Liner 1226' 7" 10574' -11800' 8156' - 8992' 7240 5410
Perforation Depth MD (ft): ì Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft):
11575' - 11697' 8846' - 8925' 5-1/2",17# x 4-1/2",12.6# L-80 1 0622'
Packers and SSSV Type: 9-5/8" x 4-1/2" TIW packer I Packers and SSSV MD (ft): 10501'
13. Attachments: 14. Well Class after proposed work: ...
~ Description Summary of Proposal D BOP Sketch D Exploratory ~ Development D Service
D Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencina Operations: August 10, 2007 ~Oil " DGas D Plugged o Abandoned
17. Verbal Approval: Date: DWAG DGINJ DWINJ o WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Howard West, 564-5471
Printed NaWid Reem Title Engineering Team Leader David Reem, 564-5743
Prepared By Name/Number;
Signature ~ h d AA_ _ Phone 564-5743 Date ':¡-/I-,{o7 Terrie Hubble, 564-4628
Commission Use On Iv
I Sundry Number: (~7" ~.J.t '1
Conditions of approval: Notify Commission so that a representative may witness
D Plug Integrity ~BOP Test D Mechanical Integrity Test D Location Clearance
Other: ~500~\ ~\> \t"" \-
Ç>"","\~ c.0\>" Ð S;.?:å C; ~ ~ ~~\(;)~-~,,~~ <b~
Subsequent Fonn Requi'ed' '-\tlL\, . !J
APPROVED BY ~Z-ð1-
Approved Bv: I -;, OMMISSIONER THE COMMISSION Date
Fonn 10-403 Revised 06120060 RIG IN ~ \. .- Fl Submit In Duplicate
~'~BAIJG 022007 <ò\\\c1 /Þ1~'4>7
;:
6f;#-
4~P7
.
.
G
K-14 Rig Workover
Scope of Work: Pull 5-1/2" x 4-1/2" L-80 completion, run and cement 7" scab liner to -4000' to cover
cretaceous leak, replace 9-5/8" pack-off, and run 4-%" 13Cr80 completion. ./
MASP: 2380 psi
Well Type: Producer /
Estimated Start Date: Aug 10, 2007
Pre-Rig:
0 1 Check the tubing hanger lock down screws for free movement. Completely back out and check
each lock down screw for breakaqe (check one at a time). PPPOT-T & IC.
S 2 Drift to 10586' for 4 %" XX plug & chemical cutter. Set TTP in the XN-nipple @ 10586' md.
Dump bail 1 0' of sluÇJÇJits on top of pluo.
E 3 Chemical cut @ -10460', in the middle of the 1 S full joint above the packer. (Ref: 09/29/1987
tubinq summary).
F 4 Circulate well with seawater and FP w/ diesel thru the cut. CMIT TxlA to 3500 psi to confirm
mechanical barrier and casino inteority. Bleed WHP's to 0 psí.'....
0 5 Set a BPV in the tubing hanger. Remove the wellhouse & flow line Level the pad as needed
for the riq.
""I
\)ro~"'()(è C\-ö-~~ ~Ö~'i ð~
Proposed Procedure <::.."-' 'T \ ~ -\-c <.s::.,",,~"~~'\:t) 'i'\,Jt"'rl
1. MIRU. ND tree. NU and test BOPE with to 250 psi low, 3500 psi high. Circulate out freeze ~~,
protection fluid and circulate well to clean 9.8 ppg brine through the cut. l
2. Pull and LD tubing string to the cut.
3. Run 7" scab liner on drill pipe to cover cretaceous leak Note: VBR's will not be changed to 7" pipe
rams due to a tested mechanical barrier to the Ivishak.
4. Cement new 7" scab liner to top of liner and set liner top packer and hanger.
5. Change out 9-5/8" packoff and pressure test to 3800 psi.
6. Run 4- W' 13Cr80 completion with Baker S-3 packer.
7. Displace the IA to packer fluid and set the packer.
8. Test tubing and IA to 3500 psi. Freeze protect to 2200' MD.
9. Set BPV. ND BOPE. NU and test tree. RDMO.
TREE =
WELLHEAD =
ACTUATOR =
KB, ELEV =
BF, ELEV =
KOP=
Max Angle =
Datum MD =
Datum lVD =
6" CAMERON
MCEVOY
AXELSON
53.20'
25,62'
2055'
50 @ 3962'
11587'
8800' SS
15-1/2" TBG, 17#, L-80, ,0232 bpf, ID = 4,892" 1
ITOP OF 4-1/2" TBG 1
113-3/8" CSG, 72#, L-80, ID = 12347" 1
Minimum ID = 3.725" @ 10586'
4-1/2" OTIS XN NIPPLE
TOP OF 7" LNR 1
10567'
14-1/2" TBG, 12,6#, L-80, ,0152 bpf, ID = 3958" 1
10622'
19-5/8" CSG, 47#, L-80, ID = 8,681" I
10827'
ÆRFORA TION SUMMA RY
REF LOG: BHCS ON 09/26/87
ANGLEAT TOP ÆRF: 49 @ 11508
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
3-3/8" 4 11508 - 11515 S 06/18/99
3-3/8" 4 11560 - 11575 S 06/18/99
3-3/8" 6 11575 - 11595 0 11/25/99
3-3/8" 10 11599 - 11620 0 08/23/99
3-3/8" 10 11630 - 11659 0 08/23/99
3-1/8" 4 11664-11675 0 07/03/99
3-1/8" 4 11682-11697 0 07/03/99
I PBTD 1
11756'
I 7" LNR, 26#, L-80, ,0383 bpf, ID = 6276" 1
11800'
DATE
09130187
08/16/03
01/07/06
REV BY COMMENTS
ORIGINAL COM PLETION
JLA/KK WAIVER SAFETY NOTE
corvvPJC WAIVER SFTY NOTE UPOA TE
DATE
K-14
ðI:\
."
/
REV BY
COMMENTS
S OTES: CRETACEOUS LEAK***
PRO CTION CASING LEAK. OPERATING LIMITS:
MAX lAP = 500 PSI; MAX OAP = 1000 PSI
(01/07/06 WAIVER) ***
1978' ~5-1/2" OTIS HRQ SSSV LAND NIP, ID = 4,562"
2500'
GAS LIFT MANDRELS
ST MD lVD DEV TYÆ VLV LATCH PORT DATE
4 3104 2942 38 OTIS RA
3 7517 5967 45 OTIS RA
2 10237 7870 46 OTIS RA
1 10345 7943 46 OTIS RA
10425' - 4-1 /2" BKR L SLIDING SL V, ID = 3,812" I
10484'
10500'
10547' -4-1/2" OTIS X NIP, ID = 3,813" I
10586' -4-1/2" OTIS XN NIP, ID = 3,725"
10622' -4-1/2" TBG TAIL ID = 3.958"1
10626' H ELMD TT LOGGED 10130/87 I
10975' - 7" MARKER JOINT I
11730' - FISH - KINLEY CUTTER I
PRUDHOE BAY UNfT
WELL: K-14
ÆRMfT No: f'1870950
API No: 50-029-21752-00
SEC 4, T11 N, R14E. 1909' FNL & 4106' WEL
BP Exploration (Alaska)
TREE =
WELLHEÁD =
ACTUATOR =
KB, ELBI =
BF. ELBI =
KOP=
Max Angle =
Datum MD =
Datum lVD =
6" CAMERON
MCBlOY
AXELSON
53,20'
25,62'
2055'
50 @ 3962'
11587'
8800' SS
113-3/8" CSG, 72#, L-80, ID = 12,347" I
ITOP OF 7" Scab Lnr 1--1
4000'
17" Scab Liner, 26#, L-80
1-
Minimum ID = 3.725" @ 10586'
4-1/2" OTIS XN NIPPLE
TOPOF7" LNR H 10567'
4-1/2"TBG, 12,6#. L-80, ,0152bpf, ID=3,958" H 10622'
19-5/8" CSG. 47#, L-80, ID = 8,681" H 10827' I
ÆRFORA TION SUMMARY
REF LOG: BHCS ON 09/26/87
ANGLE AT TOP ÆRF: 49 @ 11508
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 4 11508 - 11515 S 06/18/99
3-3/8" 4 11560 - 11575 S 06/18/99
3-3/8" 6 11575 - 11595 0 11/25/99
3-3/8" 10 11599 - 11620 0 08/23/99
3-3/8" 10 11630 - 11659 0 08/23/99
3-1/8" 4 11664-11675 0 07/03/99
3-1/8" 4 11682-11697 0 07/03/99
1 PBTD 1
11756'
I 7" LNR, 26#, L-80, ,0383 bpf. ID = 6.276" 1
11800'
DATE
09/30/87
08/16/03
01/07/06
RBI BY COMMENTS
ORIGINAL COM PLETION
JLA/KK WAIVER SAFETY NOTE
corvvPJC WAIVER SFTY NOTE UPDATE
DATE
K-14
PROPOSED
RBI BY
COMMENTS
SA~OTES: CRETACEOUS LEAK ***
PRO.i-ION CASING LEAK. OPERATING LIMITS:
MAX lAP = 500 PSI; MAX OAP = 1000 PSI
(01/07/06 WAIVER) ***
2000' H4-1/2" HES X NIP, ID = 3,813" I
ST MD
4 TBD
3 TBD
2 TBD
1 TBD
GAS LIFT MANDRELS
lVD DBI TYÆ
41/2"x1"
41/2"x 1"
4 1 /2" x 1"
4 1/2" x 1"
H4-1/2" HES X NIP, ID = 3,813" 1
1--17" X 4-1/2" Baker S-3 PKR, 13Cr
H4-1/2"HESXNIP,ID=3,813" I
1-14-1/2" 13-Cr 80 TBG, Vam Top
10484' HTBG SEAL ASSY SBR 1
10500' H 9-5/8" X 4-1/2" TIW PKR I
10547' H4-1/2" OTIS X NIP, ID = 3.813" 1
10586' H4-1/2" OTIS XN NIP. ID = 3,725"
10622' H4-1/2" TBG TAIL ID = 3,958"1
10626' H ELMD TT LOGGED 10/30/87 1
10975' -17" MARKER JOINT 1
11730' H FISH - KINLEY CUTTER I
ffiUDHOE BA Y UNIT
WELL: K-14
ÆRMIT No: '1870950
API No: 50-029-21752-00
SEC 4, T11 N, R14E. 1909' FNL & 4106' WEL
BP Exploration (Alaska)
.
.
Page 1 of 1
Maunder, Thomas E (DOA)
From: West, Howard J [Howard.West@bp.com]
Sent: Tuesday, July 31, 20074:18 PM
To: Maunder, Thomas E (DOA)
Subject: RE: K-14 (187-095)
Tom,
I apologize for not including the required cement volume, I will keep that in min and pass it on to the others.
190 bbls of cement will be pumped. This is based on the annular volume of 7" x 9 5/8" from 10,460 MD to 4,000
MD plus 25 bbls.
Doyon 16 will perform the workover portion and Nordic 1 will do the sidetrack.
The stack used during the workover operation will be Doyon 16's typical three ram stack with 3-1/2" x 6" pipe
rams.
If you have any other questions / comments, please let me know.
Thanks,
Howard
~~----_._~._._-~--
._---_.-
----..-----
From: Reem, David C
Sent: Tuesday, July 31, 2007 12:21 PM
To: West, Howard J
Subject: FW: K-14 (187-095)
Howard, pis respond to Tom's questions.....
_~<_·____,__ü_~__..__.~_~,___
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Tuesday, July 31,2007 12:19 PM
To: Reem, David C
Subject: K-14 (187-095)
Dave,
Got your call that there is a workover planned prior to the coil sidetrack. A few other questions...
1. Would you please provide cement volume information for the scab liner? For future reference, this is an item
that should be included fo similar operations in the future. Please pass this on to your colleagues.
2. What rig will be performing the work? Win Nordic 1 do both workover and coil sidetrack?
3. What stack configuration is proposed?
Call or message with any questions.
Tom Maunder, PE
AOGCC
8/1/2007
.
~1f~1fŒ (ID~ ~~~~æ!Æ
.
AI,A~1iA. OIL AlQ) GAS
CONSBRVATION COMMISSION
SARAH PALIN, GOVERNOR
333 W. 7th AVENUE. SUITE 100
ANCHORAGE. ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Abby Higbie
CT Drilling Engineer
BP Exploration Alaska, Inc. SCANNED JUL 2 7 2007
PO Box 196612
Anchorage, AK 99519-6612
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU K-Í:~t.i·-~·'1_oq5
Sundry Number: 307-245 \1:;) I
Dear Ms. Higbie:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may me with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
DATED this zÇday of July, 2007
Enc!.
(Jag "1h"()1 . ~
v .. STATE OF ALASKA 7-/9-~
ALASKA Oil AND GAS CONSERVATION COMMISSION A- ""':>,
APPLICATION FOR SUNDRY APPROVAL
20 MC 25 280
EiVED
'i !'
,JuL
1 9 Z007
&
COrlS. CŒmmissíon
., ..L, '''^
;-".>,. " iJ;
1. Type of Request: 181 Abandon o Suspend o Operation Shutdown o Perforate o Time Extension
o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well
o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. t8:I Development D Exploratory 187-095 -
3. Address: D Service D Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21752-00-00 ~
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU K-14 -
Spacing Exception Required? DYes t8:I No
9. Property Designation: 110. KB Elevation (ft): 11. Field / Pool(s): -
ADL 028303/ 53.2' I Prudhoe Bay Field / Prudhoe Bay Pool
112. .' '. ..... . < PRESENT WELL (;(.INUI r ~I .< . </\ ....... . .
. .. .\/ .'.
Total Depth MD (ft): Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
11800 . 8992 11756 8964 None 11730
Casino Lenoth Size MD TVD Burst CollaDse
Structural
Conductor 110' 20" 110' 110'
Surface 2720' 13-3/8" 2720' 2678' 4930 2670
Intermediate 1 0830' 9-5/8" 10830' 8338' 6870 4760
Production
Liner 1226' 7" 10574' -11800' 8156' - 8992' 7240 5410
Perforation Depth MD (ft): Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft):
11575' - 11697' 8846' - 8925' 5-1/2",17# x 4-1/2",12.6# L-80 10622'
Packers and SSSV Type: 9-518" x 4-1/2" TIW packer packers and SSSV MD (ft): 10501'
13. Attachments: 14. Well Class after proposed work:
t8:I Description Summary of Proposal D BOP Sketch D Exploratory t8:I Development D Service
D Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
CommencinQ Operations: August 20, 2007 DOil DGas D Plugged ~ Abandoned
17. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Abby Higbie, 564-5480
Printed Name Abby Higbie Title CT Drilling Engineer
1'1 . ~ Datel J I1loÎ Prepared By Name/Number:
Signature L.:;/·e . . Phone 564-5480 Terrie Hubble, 564-4628
;/<--" Commission Use Onlv
1 Sundry Number: ...307 · ~,!"/'l:)
Conditions of approval: Notify Commission so that a representative may witness
D Plug Integrity I$...BOP Test D Mechanical Integrity Test D Location Clearance
Other: )ÇDO \>~~\ \7,a Y' ~<;>\-- ú.~ ~ \O-t--~
RBDMS BFL JUL 2 6 Z007
Subsequent Form Required: ~\J'm1!!
~ W~MMISSIONER APPROVED BY Date 1-...],~ ~
Approved By: THE COMMISSION
Form 10-403 Revised 06/2006 l/ V '---' Submit In Duplicate
ORIGINAL
~ ~ø;>
.
.
Obp
To: Tom Maunder
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Abby Higbie
CTD Engineer
Date: July 12, 2007
Re: K-14 Sundry Approval
CC: Well File
Sondra Stewman/Terrie Hubble
Sundry approval is requested to prepare K-14 for a sidetrack. Well K-14 was a vertical ZlB/Z2 well completed
in 1987. The well produced full time through 1990 when a CNL log indicated a gas underrun to Zl and a thick
oil lens remaining in Z2. Adperfs were shot in Z2 OL in 1990 and dominated production. It remained full time
until 1993 then went on cycle. Lower Z2 was then perforated and those perfs came on at 3000 BOPD full-time
for several months the returned to cycle production. Recent cycle trends are deteriorating as Z2 recharge is
showing signs of depletion. Total cumulative production to date is ~5.5 MMBO.
REASON FOR SIDETRACK:
K-14 is a cycle well with deteriorating on-time. The sidetrack, K-14A, will exit the existing 7" liner above the
perfs in Z2 to access new Zl!Z2A reserves. The existing perforations will be isolated by the liner cement
job. A schematic diagram of the proposed sidetrack is attached for reference.
Pre-Rig Work: (Scheduled to begin August 20th, 2007)
1) S Passed tubing caliper inspection
2) 0 Dummy GLVs
3) 0 Passed MIT -IA and MIT -OA.
4) 0 AC -LDS; AC-PPPOT-IC, T
5) S Run dummy whipstock drift _ \
6) E Set4W'x7"WSatl1220' \ ~ D
7) 0 Perform injectivity test \S 0- ~ \ ~ ú..-
8) C Pump 15.8 ppg cement down squeeze past WS to isolate existing perfs-25bbl
t 9) 0 PT cement plug to 2000 psi c.().<;.\",~ ~~.\\.....~\- ~~~
10) 0 PTMV, SV, WV ....... ~ f'~-' '\ , t
11) 0 Blind and bleed lines - \" 7\. ~b\<-:,
12) 0 Remove wellhouse, level pad
ork: (Scheduled to begin October 15th, 2007)
1) ordic 1 and test BOPE to 250psi low and 3500psi high.
2) Mill3.80 . win 7" liner at 11220'
3) Drill Build: 4.125' , 5' (45 deg/100 planned)
4) Drill Lateral: 4.125" OH, 84 e /100 planned)
5) Run 3-3/16" solid liner, cement
6) Cleanout liner and MCNL/GR/CCL log
7) Test liner lap to 2000 psi
8) Perforate liner per asset instructions (~200')
9) Freeze protect well, set BPV and RDMO
Post-Rig Work:
1) Install well house, GLM and attach production lines
2) Pull BPV
,~~', \~~ ~\L~
\~ \N:..O~~\~~ \)~
Q\;"--~ Ni:».> ~,~
!f3-9'M'?~~"
6"CA N
WCBIOY
AXELSON
53.20'
25.62'
2055'
50 @ 3962'
11587'
8BOO' SS
K-14
.
5-112" TBG, 17#, L-BO, .0232 bpf, ID = 4.892"
TOP OF 4-112" TBG
113-3/8" CSG, 721#, L-80, ID = 12.347" H 2719'
Minimum ID = 3.725" @ 10586'
4-1/2" OTIS XN NIPPLE
TOP OF 7" LNR
10567'
4-112" TBG, 12.61#, L-BO, .0152 bpf, ID = 3.958"
10622'
9-518" eSG, 47#, L-80, ID = 8.681"
10827'
ÆRFORA1lON SUMMARY
REF LOG: BHCS ON 09/26/87
ANGLEATTOPÆRF: 49 @ 11508
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OpnlSqz DATE
3-3/8" 4 11508 - 11515 S 06118/99
3-3/8" 4 11560 - 11575 S 06/18/99
3-3/8" 6 11575 - 11595 0 11/25/99
3-3/8" 10 11599 - 11620 0 08123199
3-3/8" 10 11630 - 11659 0 08123/99
3-118" 4 11664-11675 0 07103199
3-118" 4 11682-11697 0 07103199
I PBTD I
11756'
I 7" LNR, 261#, L-80, .0383 bpf, ID = 6.276" H 11800'
DATE REV BY COMIIENTS
09130/81 ORIGINAL COMPLETION
07/16101 RNlKAK CORREC1lONS
11/16102 ASlKAK ÆRF CORRECTIONS
08116103 CMOfTLP K8 8...EV AI¡[) MAX ANGLE
08116103 JLAIKK WAIVER SAFETY NOTE
DATE REV BY
COM\IENTS
SAFETY NOTES: CRETACEOUS LEAK·-
PRODUCTION CASING LEAK. OPERATING UMITS:
MAX lAP = 500 PSI; MAX OAP = 1000 PSI
(08/16103 WAlVER)-·
1978' -15-112" OTIS HRQ SSSV LAND NIP, ID = 4.562"
2600'
5-112" X 4-112" XO
Me
3104
7517
10237
10345
GAS LIFT MANæB...S
lVD DEV 1YÆ VLV LATCH PORT DATE
2942 38 OTIS RA
5967 45 OTIS RA
7870 46 OTIS RA
7943 46 OTIS RA
10425'
4-112" BKR L SLIDING SLV, ID = 3.812"
10484' HTBG SEAL ASSY SBR I
10500' -19-518" X 4-112" TIW PKR
10547'
4-112" OTIS X NIP, ID = 3.813"
10586'
4-112" OTIS XN NIP, ID = 3.725"
10622' -14-112" TBG TAIL ID = 3.958" I
10626' H ELMD TT LOGGED 10130/87 I
10975'
7" MARKER JOINT
11730' H FISH - KINLEY CUTTER
PRUDHOE BAY UNIT
W8...L: K-14
ÆRMT No: 1870950
AA No: 50-029-21752-00
SEC 4, T11N, R14E. 1909' FNL & 4106' We.
BP Exploration (Alas ka)
PERFORA TIQNSUMMARV
REF LOO: BHCS ON 09128/87
ANGtEATTOPPERF: 49@11508
11508" 11515
11560-11575
11575 - 11595
11599-11620
11630 - 11659
11664 - 11675
11682 - 11697
3-1/8"
SAÆlYNOTES:
PRODUCTION
MAX lAP =: 500
(01/11/03 WANER) aU
BP
.
.
Review of Sundry Application 307-2245
BP Exploration (Alaska) Inc.
Well Prudhoe Bay Unit K-14
Prudhoe Bay Field, Prudhoe Oil Pool
AOGCC Permit 187-095
Requested Action:
BP Exploration (Alaska) Inc. (BPXA) proposes to plug the existing well to prepare it for
sidetracking.
Recommendation:
I recommend approval of BPXA's request.
Discussion:
Well K-14 was originally drilled and completed in 1987. The well produced essentially
continuously until early 1994 when it began to be cycled. Cumulative production is
about 6.3 mmstb of oil. During the months when the well is produced it will typically
flow for 15 to 20 days and produce about 700 stb/d at a GaR of 50,000 to 60,000 scf/stb.
The well is usually produced each month, but can go several months without being
brought into production. The K pad is currently producing approximately 6,000 to 7,000
stb/d at a GaR of 35,000 to 40,000 scf/stb. The oil production rate for the subject well is
comparable to some of the other wells on the, but the GaR is significantly higher than
the majority of the regular producers, many of which produce at GaRs of 20,000 to
30,000 scf/stb.
BPXA's application states that the current well is a vertical producer completed in the
Z 1 B and Z2 sands. The proposed sidetrack would be completed in the Z 1 and Z2A
zones.
Conclusion:
Although the subject well does produce well, when it is cycled on, the fact that it
produces at a high GaR means that it is regularly taken off production due to the limited
facility capacity and lower GaR wells are preferentially produced. Abandoning the
existing perforations and targeting areas of the reservoir that should produce with a lower
GaR, and thereby allowing the well to more regularly contribute to production, should
help to more efficiently recovery the reserves.
D.S. Roby ~
Reservoir Engi er
July 20, 2007
· '... "'...., v ¡;;; u
'\ STATE OF ALASKA ') JAN 2 4 2006
ALA~. .Á OIL AND GAS CONSERVATION COMrvl.-,~ION
REPORT OF SUNDRY WELL OPERATIONgIt'aska Oil & Gas Cons. Commission
1. Operations Abandon D Repair Well D Plug Perforations [] Stimulate D Other ~nthordUtJ
Performed: Alter Casing D Pull Tubing D Perforate New Pool D WaiverD Time Extension D
Change Approved Program D Operat. Shutdown D Perforate D Re-enter Suspended Well D
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development I;?i Exploratory Di 187-0950
3. Address: P.O. Box 196612 StratigraphicC: Service 6. API Number:
Anchorage, AK 99519-6612 50-029-21752-00-00
7. KB Elevation (ft): 9. Well Name and Number:
53.2 KB
8. Property Designation:
ADL-028303
11. Present Well Condition Summary:
Total Depth measured 11800 feet
true vertical 8992.05 feet
Effective Depth measured 11756 feet
true vertical 8963.6 feet
Casing Length Size MD
Conductor 80 20" x 30" 30 - 110
Surface 2690 13-3/8" 72# L-80 29 - 2719
Production 10799 9-5/8" 47# L-80 28 - 10827
Liner 1233 7" 26# L-80 10567 - 11800
Perforation depth:
Measured depth: 11575 - 11697
True Vertical depth: 8845.75 - 8925.46
SCANNEJ) ,Jt\N 21, !j,! 2.nOh
Representative Daily Average Production or Injection Data
Gas-Mcf I Water-Bbl I Casing Pressure Tubing pressure
SHUT-IN
46764 I 29 I 0 1088
15. Well Class after Droposed work:
Exploratory C DevelopmentR' Service r
Tubing: (size, grade, and measured depth)
5-1/2" 17#
4-1/2" 12.6#
Packers and SSSV (type and measured depth)
4-1/2" TIW Packer
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Oil-Bbl
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys Run
Daily Report of Well Operations
902
K-14
10. Field/Pool(s):
Prudhoe Bay Field/ Prudhoe Bay Oil Pool
Plugs (measured) None
Junk (measured) 11730
TVD Burst Collapse
30 - 110
29 - 2677.56 4930 2670
28 - 8335.55 6870 4760
8150.64 - 8992.05 7240 5410
L-80
L-80
28 - 2500
2500 - 10622
10500
RBDMS 8Fl ,IAN :2 5 2006
16. Well Status after proposed work:
Oil ¡;¡ Gas r WAG L
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
x
Contact Sharmaine Vestal
Printed Name Sharm~ine,vestal "' /
Slgnature~ t./l1-t£c--~"--~~
GINJ r
WINJ r WDSPL r
Sundry Number or N/A if C.O. Exempt:
N/A
Title Data Mgmt Engr
Phone 564-4424
Date 1/23/2006
Form 10-404 Revised 04/2004
ORIGINAL
Submit Original Only
)
)
K-14
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVITYDATE I SUMMARY
12/17/2005 ***WELL FLOWING ON ARRIVAL***
DRIFT TO 11609' SLM W/ 3.65" CENT, S.B., START IN HOLE W/ PDS
CALIPER
***CONT ON 12-18-05 WSR***
12/18/2005 ***CONT FROM 12-17-05 WSR***
RUN PDS CALIPER
LRS PUMP 200 BBLS LOAD WELL
ATTEMPT TO SET PX PLUG BODY
***CONT ON 12-19-05 WSR***
12/19/2005 ***CONT FROM 12-18-05 WSR***
MAKE SEVERAL ATTEMPTS TO SET PX PLUG PLUG BODY
***CONT ON 12-20-05 WSR***
12/20/2005 ***CONT FROM 12-19-05 WSR***
SET AND PULL PX PLUG BODY AND PRONG @ 10528' SLM, FOUND
RETAINER PIN FROM 4.5" GU ADAPTER IN PLUG BODY
***CONT 12-21-05 WSR***
12/21/2005 ***CONT FROM 12-20-05 WSR***
SET 4.5" PXN PLUG @ 10565' SLM, ( PRONG 96" OAL, 1 3/4" FN.. 750 PSI
ON WELL) BLEED WELL DOWN 350 PSI, GOOD TEST, LRS TESTING PLUG
TO 3000 PSI, GOOD TEST, BLEEDTUBE DOWN TO 500 PSI
***WELL S/I ON DEPARTURE*** ( NOTIFIED PAD OPERATOR)
12/22/2005 T/I/O=630/0/10. SI. Bleed WHP's to 0 psi (pre-CAM-PPPOT). TBG FL @ 456'.
Bled OAP from 10 psi to 0 psi inn 20 minutes. Bled TBG pressure from 630 psi
to 10 psi in 3.5 hours. TBG pressure remained @ 10 psi for 45 minutes while
bleeding. Monitored 30 minutes. TBG pressure increased 50 psi. Heater is on
well. Final WHPs=60/0/0
12/23/2005 T/I/O=88/0/VAC Temp=SI WHP's post-bleed (pre-Cam PPPOT). Overnight, the
TBGP increased 28 psi, the lAP remained unchanged and the OAP went on a
V AC. Heater is still on well.
12/25/2005 T/I/O = 120/0/vac. Temp = SI. Bleed WHP's to 0 psi (pre Cam PPPOT). Bled
TBG pressure to 3 psi in 4 hrs (all gas). SI, monitored for 30 min. TBG pressure
increased to 43 psi. Final WHP's 43/0/vac.
12/27/2005 T/I/O=150/0NAC Temp=SI Bleed WHP's to 0 psi (pre-Cam PPPOT-T&IC) with
Cam on location. TBGP increased 107 psi overnight. TBG FL @ 456'. Bled
TBG pressure from 150 psi to 0 psi in 90 minutes. Final WHP's=O/O/V AC.
12/28/2005 ***WELL WAS SHUT-IN UPON*** (Pull PXN plug)
JOB IN PROGRESS. RUNNING IN HOLE WITH BELLGUIDE.
WRS CONTINUED ON 12/29/2005
12/29/2005 ***WRS CONTINUED FROM 12/28/2005***
PULLED P-PRONG @10,564' SLM.
PULLED PXN PLUG BODY @10,568' SLM. RDMO.
****LEFT WELL SHUT-IN****
FLUIDS PUMPED
BBLS
o TOTAL
BP Exploration (Alaska) Inc.
Post Office Box 196612
PRB-24
Anchorage, Alaska 99519-661
bp
March 6, 2003
Mr. Tom Maunder, P.E.
Alaska Oil & Gas Conservation Commission
333 W. 7th Ave.
Anchorage, Alaska 99501
Subject: K-14 (PTD 1870950) Application for Sundry Cancellation
Dear Mr. Maunder:
Attached is the Application for Sundry Cancellation form 10-404 for well K-14. This
request is for approval to cancel the existing Sundry. A description summary of
proposal and wellbore schematic is included.
If you require any additional information or clarification, please contact either John
Cubbon or me at (907) 659-5102.
Sincerely,
Joe Anders, P.E.
Well Integrity Engineer
Attachments
SCANNED MAR n ? ?00~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _
CANCEL VARIANCE Pull tubing _ Alter casing _ Repair well _ Other ,X
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box196612
Anchorage, AK 99519-6612
5. Type of Well:
Development _X
Exploratory_
Stratigraphic__
Service_
4. Location of well at surface
1909' FNL, 4106' FEL, Sec. 04, T11N, R14E, UM
At top of productive interval
2750' FNL, 3811' FEL, Sec. 09, T11N, R14E, UM
At effective depth
3224' FNL, 3860' FEL, Sec. 09, T11N, R14E, UM
At total depth
3355' FNL, 3870' FEL, Sec. 09, T11N, R14E, UM
(asp's 671441, 5975311)
(asp's 671892, 5969200)
(asp's 671855, 5968725)
(asp's 671849, 5968593)
12· Present well condition summary
Total depth: measured
true vertical
11800 feet Plugs (measured)
8992 feet
6. Datum elevation (DF or KB feet)
RKB 53 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
K-14
9. Permit number / approval number
187-095 //,_~OO -
10. APl number
50-029-21752-00
11. Field/Pool
Prudhoe Bay OilPool
Tagged TD @ 11626' (12/28/2001)
Effective depth: measured
true vertical
Casing Length
Conductor 110'
Surface 2691'
Intermediate 10799'
Sidetrack Liner 1233'
11626 feet Junk (measured)
8879 feet
Fish - Kinley Cutter @ 11730'.
Size Cemented Measured Depth True Ve~icalDepth
20" 72 c.f. 138' 138'
13-3/8" 4185 c.f. 2719' 2678'
9-~8" 2375 c.f. 10827' 8336'
7" 414 c.f. 10567'-11800' 8840'-8992'
Perforation depth: measured
true vertical
Tubing (size, grade, and measured depth)
Open Perfs 11575'-11595', 11599'-11620', 11630'-11659', 11664'-11675', 11682'-11697'.
Sqzd Perfs 11508'-11515', 11560'-11575'.
Open Perfs 8846'-8859', 8862'-8875', 8882'-8901', 8904'-8911', 89.16'-8925'.
Sqzd Perfs 8802'-8806', 8836'-8846'.
5-1/2" 17# L-80 TBG @ 2500'. 5-1/2" x 4-1/2" XO @ 2500'. 4-1/2" 12.6#.L-80 TBG@ 10622'.
Packers & SSSV (type & measured depth) 9-5/8" x 4-1/2" TIW PKR @ 10500'.
5-1/2" Otis HRQ SSSV Landing Nipple @ 1978'.
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Averaqe Production or Iniection Data
OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure
15. Attachments
Copies of Logs and Surveys run __
Daily Report of Well Operations _
16. Status of well classification as:
Oil _X Gas __ Suspended __
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge·
I~ ~ Title: Well Integrity Engineer
SCANNED MAR n 7 2003
Form 10-404 Rev 06/15/88 ·
Questions: call Joe Anders 907-659-5102.
Date:
Prepared by DeWayne R. Schnorr 564-5174
SUBMIT IN DUPLICATE
K-14
Description Summary of Proposal
03105/03
PTD# 187095
Sundry~ 300-009 dated 02/27/00
This is a request to cancel the AOGCC Sundry dated 02/27/00.
Reason for cancellation:
K-14 is a cycled producing well with a production casing leak between 7400'-7500'. The
tubing demonstrates competency based on the pressure differential between the Tubing
and IA pressure from the TIO plot.
Recent Well Events:
> 02/20/03: MITOA to 3000 psi PASSED
TREE = 6" CAMERON SAFETY NOTES: CRETACEOUS LEAK
K-14
ACTUATOR = AXB. SON
KB, ELEV = 53.22'
BF. ELEV = 25.62'
KOP = 2055'
UaxAn la= 50~3879' O i 1978' H5-1/Z'OTISFRQSSSVLANDNIP, ID=4.56Z'
Datum MD = 11587'
Datum TVD = 8800' SS
I
151/Z'Tm, 17#, L-80,.0232bpf, lD:4.892'H 2500'
I I~ITOPOF4-1/2"'I'BGH 2500' ~ k GAS LIFTMANDRFIS
113-3/8"CSG, 72#,L-80,1D=12.347"i i 2719' ST MD 3VD DEV TYPE VLV LATCH PORT DATE
------ 4 3104 2942 38 OTIS RA
I 3 7517 5967 45 OTIS RA
2 10237 7870 46 OTIS RA
1 10345 7943 46 OTIS RA
Minimum ID = 3.725" @ 10586'
4-1/2" OTIS XN NIPPLE I
I ~ I' 10484' ~-~TBGSEALASSYSBRI
~ '1 10500' H9-5/8"X4-1/2"TIWPKRI
X
I.' ~' 10547' H4-1/Z'OTISXNP, ID=3.013"I
ITO o. I--[ lO5 ' ]
I.! I! 10586' H 4-1/2" OTIS XN NIP, ID:3.725" I
I' 10622'H4-1/z'TBG TAIL ID: 3.958"I
14-1/2"TBG, 12.6~, L-80, .0152bpf, ID= 3.958" I t 10622'
r9.5/8,, CSG, 47#, L-80, ID= 8.681" H 10827' i
PERFORATION SUIVIVIA RY
REF LOG: BHCS ON 09/26/87
A NGLEAT TOP PERF: 49@11508
Note: Refer to R'oducf~on DB for historical perf data '1
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 4 11508- 11515 S 06/18/99
3-3/8" 4 11560- 11575 S 06/18/99 '
II
3-3/8" 6 11575- 11595 O 11/25/99
3-3/8" 10 11599 - 11620 O 08/23/99
3-3/8" 10 11630 - 11659 O 08/23/99
3-1/8" 4 11664- 11675 O 07/03/99
3-1/8" 4 11682- 11697 O 07/03/99
I ; ~1~--[ 11730' ~FISH-KINLEYCUTTER I
~ 11756' I
17"LNP, 26#,L80,.0383bpf, ID=6.276"H 11800' ,I ·
DATE REV BY COIViMENTS DATE REV BY COMIVlENTS PRUDHOEBAY UNIT
09/30/87 ORIGIN& L CObPLETION WELL: Ko 14
02/22/01 SIS-SLT CONVERTEDTOCANVAS PERMITNo: 1870950
03/05/01 SIS-MD FINAL ARNo: 50-029-21752-00
07/16/01 RN/KAK CORRECTIONS SEC 4, Tll N, R14E
11/16/02 AS/KAK PEF~ CORRECTIONS
BP Exploration (Alaska)
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 4 11508- 11515 S 06/18/99
3-3/8" 4 11560- 11575 S 06/18/99
3-3/8" 6 11575- 11595 O 11/25/99
3-3/8" 10 11599- 11620 O 08/23/99
3-3/8" 10 11630 - 11 659 O 08/23/99
3-1/8" 4 11664- 11675 O 07/03/99
3-1/8" 4 11682- 11697 O 07/03/99
ALAS,~A OIL AND ~,,~' ~;~I~I~'-~I~,'~;ON COMMISSI.._..ON
REPORT '_,F SUNDRY WELL OP,.... ,- ATIONS
1. Operations performed: Operation shutdown__ Stimulate__ Plugging__
Pull tubing__ Alter casing Repair well
Perforatex
Other X
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchora_cle, Alaska 99519-6612
4. Location of well at surface
1909' SNL, 4106' WEL, Sec. 4, T11N, R14E
At top of productive interval
2750' SNL, 3811' WEL, Sec. 9, T11N, R14E
At effective depth
3322' SNL, 3867' WEL, Sec. 9, T11N, R14E
At total depth
3356' SNL, 3852' WEL, Sec. 9, T11N, R14E
5. Type of Well:
DevelopmenlX
Exploratory __
Stratigraphic __
Service __
6. Datum elevation (DF or KB)
K~E = 53.22
7. Unit or Property name
Prudhoe Bay Unit
feet
8. Well number
K-14 (23-9-11-14)
9. Permit number/approval number
87-95 /
10. APl number
50- 029-21752
11. Field/Pool
Prudhoe Off Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural
Conductor 80'
Surface 2684'
Intermediate 10802'
Production
Liner 1226'
Perforation depth: measured
11800'
8991
Size
20"
13-3/8"
9-5/8"
7"
feet Plugs (measured)
feet
feet Junk (measured)
feet
Cemented
8 cuvds concrete
4185 cu fl ArcticSet II
2375 cu fl Class G
414 cu fl Class G
true vertical
Tubing (size, grade, and measured depth~l-1/2" 12.6# @ 10485' MD
5-1/2" 17# @ 1997' MD
Packers and SSSV (type and measured deptl'C?acker @ 10501' MD
SSSV @ 1971' MD
Measured depth
110'
2720'
10830'
11800'
True vertical depth
110'
2681'
8337'
8991'
ORIGINAL
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressur6
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure
1273 20619 27 0
1372 20134 26 0
Tubing Pressure
2102
2112
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Gas Suspended
Service
17. I hereby.,6tertif.,Chat ~l~e fore,~C)ing is true~a,p,C'...correct to the best of my knowledge,
Signed Z/¢~///..f,'../C~.u, _.~ Title Technical Assistant IV
Form 10-404 RCe~, 0~/'~ 5'/8'8'''I -
Date/~ ,~~_~//'~' I ~'
SUBMIT IN Dt-J'PLICAT...~~
K-14
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
06/18/99
A Sandback Cement Squeeze was performed using the following
fluids:
SUMMARY
June 17, 1999: MIRU DS CTU #2 & BP Squeeze Unit. Pick up sand dump
nozzle. Kill well with FSW. RIH while pumping down coil to maintain fluid
column. Dry tag at 11737' (corrected to WL tag 5/7/99). Lay sand plug 11737' to
11590'. Tag top of sand after washing liner and allowing for settling @ 11590'.
Second tag at 11590' (within requested window). POH. Stand back injector.
SDFN June 18, 1999: Pick up Joust nozzle and stinger. RIH. Tag sand top at
11590'. Pick up 10' and flag pipe. Injectivity with FSW-2 bpm @ 520 psi. Cool
down wellbore with FSW. Pump 10 bbls of acid (described below) while
reciprocating through perforated intervals 11508' to 11580'. Injectivity before
acid = 2 bpm @ 645 psi. Injectivity after acid = 2 bpm @ 685 psi. Overflush with
50 bbls FSW. Lay in cement with additives described below. Ramp pressure to
3000 psi. Placed approximately 3.5 bbls of cement behind pipe. Held squeeze
for 45 minutes, pressure dropped from 3000 psi to 2900 psi. WCTOC - 11136'.
Reduce pressure to 500 psi, contaminate excess cement with biozan and
circulate out. Spot 20 bbls 10% TEA over perforations. Chase out contaminated
cement with slick filtered sea water at 80%, washing jewelry thoroughly. Wash
tree and freeze protect tubing with 55 bbls MEOH. Observe WHP @ surface.
Holding 500 psi. Leave pressure on well, RD CTU #2 and Squeeze Unit.
Fluids Pumped
BBLS. Description
55 MeOH
1228 SW
21 Gel (sand dump)
10 Acid (see composition below)
24 Biozan I'?~/ 0 5 1999
20 10% TEA
22 Cement (see composition below) Ala~0il&GasCons. Commissi0n
1380 Total Pumped An~ho~af~e
K-14
DESCRIPTION OF WORK COMPLETED
REPERF
08/23/99
SUMMARY
The following interval were reperforated using 3-3/8" guns, 6 SPF, random
orientation and 60° phasing.
11600'-11620' MD
11630'-11650' MD
RECEIVED
'3'J 05 1999
Alaska Oil & Gas Cons. Commi~on
Anchorage
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 11 July 1995
RE: Transmittal of Data
Sent by: PRIORITY MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
· WELL
H-O
O/ W 34 (41-20-11-12
lob -
( 11-13)
DESCRIPTION
1 PFC/PERF FINAL BL+RF
1 PDK/GR FINAL BL+RF
1 PDK/GR FINAL BL+RF
1 PLS FINAL BL+RF
1PFC/PERF FINAL BL+RF
ECC No.
Run # 1 1076.01
Run # 1 3772.01
Run # 1 5602.03
Run # 1 6049.06
Run # 1 6447.02
Please sign and return to: Attn. Rodney D. Paulson
B Street
~ Sui~te 201
/ · Anchorage, AK 99518
Received by:/- /~,fi4/~ / ,~/_~,/~/~ Date:
STATE OF ALASKA
ALASt~'~'~OIL AND GAS CONSERVATION COMMISSIC~--'
REPORT SUNDRY WELL OPE,,ATIONS
1. Operations performed: Operation shutdown __ Stimulate__ Plugging__
Pull tubing Alter casing Repair well_
Perforate_X,, .~
Other_ __ {/;~') ,
6. Datum eleva/ii~ .~:~F pr KB)
7. Unit or Prope~ ng~~ ~
Prudhoe Bay Unit /~'~
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1909'SNL, 4106' WEL, Sec. 4, T11N, R14E
At top of productive interval
2750' SNL, 3811' WEL, Sec. 9, T11N, R14E
At effective depth
3322' SNL, 3867' WEL, Sec. 9, T11N, R14E
At total depth
3356' SNL, 3852' WEL, Sec. 9, T11N, R14E
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
8. Well number
K-14(23-9-11-14)
9. Permit number/approval number
87-95 /
10. APl number
50- 029-21752
11. Field/Pool
Prudhoe 0il Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural
Conductor 80'
Surface 2684'
Intermediate 10802'
Production
Liner 1226'
Perforation depth: measured
true vertical
11800' feet
8991 feet
feet
feet
Size
Plugs (measured)
Junk (measured)
Cemented
20"
13- 3/8"
9-5/8"
Measured depth
True vertical depth
8 cu yds concrete 110' 110'
4185 cuft ArcticSet II 2720' 2681'
2375 cuft Class G 10830' 8337'
7" 414 cuft Class G 11800' 8991'
Tubing (size, grade, and measured depth) 4-1/2" 12.6# @ 10485'MD
5-1/2" 17# @ 1997'MD
Packers and SSSV (type and measured depth) Packer @ 10501' MD
SSSV @ 1971' MD
13. Stimulation or cement squeeze summary
Intervals treated (measured)
23 1996
14.
Treatment description including volumes used and final pressure Alaska Oil & (;as Cons. Commission
An~.hnrnn~.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation
Subsequent to operation
1273 20619 27 0 2102
1372 ~ 20134 26 0 2112
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run __
Daily Report of Well Oper~ons Oil Gas Suspended
17. I here~/ce~ify tha~t the f~going is true ~d~¢orrect to the best of my knowledge.
S ' g n e d ~/-;.~/~/.~/~.~,¢~ ~/~"i//<,Sf Title TechnicalAssistantll,
Form 10-404 Rev 06/15/88 ~'
Service
,,
Date
SUBMIT IN DUPLICATE
WELL K-14(23-9-11-14)
Addperf
7/05/95
The following additional interval were perforated using 3 3/8"
guns, 4 SPF, random orientation and 60° phasing.
11560'- l1580'MD
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Dear Sir/Madam,
Reference:
PRUDHOE BAY
NORTH SLOPE, AK
Date:
RE:
27 June 1995
Transmittal of Data
Enclosed, please find the data as described below:
ECC #: 6447.01
Sent by: PRIORITY MAIL
Data: LDWG
Tapes/Diskettes: 1
LDWG TAPE + LIS
Run # 1
Please sign and return to: Attn. Rod~_
At l~~el ine Services
/5600 B Street
Anchorage, AK 995138
Received by: ~ ., Date: '~0//~
LARRY GRANT w~ Date: 22 June 1995
Attn, ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE ~,C~\-' ~ RE: Transmittal of Data
AK, 99501. ~v-'~0Q . ,.. ,,,e,': y: PRIORITY MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
(4J-1~6-11-13) 1 PFC/PERF FINAL BL+RF
~ H-08
Run # 1 4990.03
1PFC/PERF FINAL BL+RF Run # 1
1 CN/GR FINAL BL+RF
6245.06
Run # 1 6447.01
Please sign.and return to: Attn. Rodn~~
atlas~ne Service/
~_~~ree~
AnchOrage, AK 99518
Received by: Date:
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 20 June 1995
RE:
Transmittal of Data
Sent by: PRIORITY MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
$~-04 (23-29-11-14)
DESCRIPTION
1 PFC/PERF FINAL BL+RF
1 PFC/PERF FINAL BL+RF
1 PLS/X-Y FINAL BL+RF
1 PFC/PERF FINAL BL+RF
1 CCL FINAL BL+RF
1 PAS/STP FINAL BL+RF
FCC No.
Run # 1 3901.03
Run # 1 5807.03
Run # 1 5904.02
Run # 1 6089.04
Run # 1 6236.01
Run # 1 6447.00
Please sign and return t~"~t_tn. Rodney
A~s Wirel~de Services
Suite/~~
Anchorage, A~
Recei
.,
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :08/23/90
T#:81510
FROM-
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
~¢ K-14 FM/Temp 08/13/90 #1 11280-11750 Camco 5"
~l R-18 Prod-F 08/06/90 #1 3000-9975 Camco 5"
~'W-12 Prod- F 08/08/90 #1 13550-13930 Camco 5"
v'X-24 FM/Temp 08/13/90 #1 8980-9451 Camco 5"
~X-24 PITS 08/12/90 #1 9000-9455 Camco 5"
V' Y-09 PITS 08/12/90 #1 10050-10570 Camco 5"
~' Z-32 PITS 08/09/90 # 1 9950-11250 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RECEIVED
A U G 2 9 1990
Alaska Oil & Gas Cons. comm'tssion
Anchorage
i'~..~/, ~.A OIL AND GAS CONSERVATION CO,
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown
Stimulate Plugging Perforate X
Pull tubing Alter casing
2. Name of Operator
BP Exploration (Alaska) inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1909'SNL, 1174'EWL, Sec. 04, T11N, R14E, UPM
At top of productive interval
2750'SNL, 1469'EWL, Sec. 09, T11N, R14E, UPM
At effective depth
3284' SNL, 1433' EWL, SEC. 09, T11N, R14E, UPM
At total depth
3357' SNL, 1428' EWL, Sec. 09, T11N, R14E, UPM
Repair well
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
Other
6. Datum elevation (DF or KB)
KBE = 53.22 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
K-14 (23-09-11-14) PBU
9. Permit number/approval number
87-95 / 90-253
10. APl number
50- 029-21752
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
11800'feet
8991 feet
11704 feet
BKB 8929feet
Plugs (measured)
Junk (measured)
fish at 11704' WLM (04/90)
Length Size Cemented Measured depth True vertical depth
110 20 8 c.y. 138 138
292 13 3/8 4185 c.f. 2720 2681
10802 9 5/8 2375 c.f. 10830 8337
1226 7 414 c.f. 105 74-10800 8155-8991
measured 11508'-11515', 11599'- 11620', 11630'-11653', 11664'-11675', 11682'-11697'
true vertical subsea
8747'-8872' (five intervals)
Tubing (size, grade, and measured depth) 5 1/2" L-80 surface-2500', 4 1/2" L-80 2500'-10500' with 4 1/2" tailpipe to 10622'
Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 10500';5 1/2"SSSVat 1978'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
Gas Cons°
Anch0rag~
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Produ~ign or In!ev'-'tign Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
3751 10732 0 0
2130 9846 0 0
Tubing Pressure
109
119
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operations Oil X Gas Suspended
17. I hereby cex~y that the foregoing is true and correct to the best of my knowledge.
Signed ~1~ '~, ?~/~,~ Title Supervisor Gravity Drainage
F°~m 10-404 Rev 06/15/88
Service
SUBMIT IN DUPLICATE
WELL K-14 (23-09-11-14) PBU
ADD'L. PERFORATION OPERATIONS
The following additional interval was perforated April 21, 1990, using Schlumberger
3 3/8" carrier guns at 4 spf:
11508' - 11515' MD BKB (Ref. BHCS, 9/26/87)
A lubricator was installed and tested to 3500 psi for all well work. The well was
returned to production immediately following perforating operations, then tested.
jam
5/24/90
m.
BP EXPLORATION
BP Exploralion (Alaska) Inc.
900 East Benson Boulevarcl
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO:. D IS TRIB UTION D a t e: 04/27 / 90
T#: 81127
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions,
please contact BP Well Records at (907) 564-dd45.
C-04 Gamma Ray 04/15/90 # 1 10298-10388 Atlas 5"
D-!4 ,,Collar 04/17/90 # 1 9300-9650 ,, Atlas 5"
D-17 Perf 04/20/90 # 1 9750-10366 Sch 5"
E-25 Prod-F 04/21/90 # 1 9500-11500 Sch 2" 5"
H-08 CNL 04/18/90 # 1 8850-9424 S ~.h " 5"
J-09 Perf 04/19/90 # 1 8300-9873 Sch 5"
J-16 Perf 04/19/90 # 1 9300-9546 Sch 5"
K-14 Perf 04/21/90 # 1 10300-11746 Sch 5"
W-24 Tubing Cutter 04/22/90 # 1 8700-8930 8-m¥ ~ft.P,d 5"
Distribution:
ARCO
CStEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVO[]~-...~
~xr-x-w,.o# ~ASrAb
ARCHIVES
f,4A¥ - 2 1990
Nas.~ 0Il & Oas Cons.
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
April 16, 1990
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well K-14 (23-09-11-14) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our proposal
to perform remedial/capacity sustai~ment work on tke well.
~~Yo s very r~ y,
R razier
Supervisor Gravity Drainage
RBF: JAM
Enclosures (9)
co: L. Burke (MB12-1)
Well File
RECEIVED
Oil & Gas Cons. Commisslor~
Anchorage
1. Type of Request:
STATE OF ALASKA
A OIL AND GAS CONSERVATION COMM, ,~1
APPLICATION FOR SUNDRY APPROVALS
Abandon Suspend ~
Alter casing ~ Repair well
Change approved program ....
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1909'SNL, 1174'EWL, Sec. 04, T11N, R14E, UPM
At top of productive interval
2750' SNL, 1469'EWL, Sec. 09, T11N, R14E, UPM
At effective depth
3323' SNL, 1430' EWL, SEC. 09, TI 1N, R14E, UPM
At total depth
3357' SNL, 1428' EWL, Sec. 09, T11N, R14E, UPM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Operation Shutdown Re-enter suspended well~
Plugging Time extension Stimulate
Pull tubing ~ Variance Perforate X Other~
5. Type of Well: 6. Datum elevation (DF or KB)
Development X KBE ,, 53.22 AMSL feet
Exploratory
Stratigraphic 7.
Service
11800' feet Plugs (measured)
8991 feet
11756 feet Junk (measured)
BKB 8963 feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented Measured depth
110 20 8 c.y. 138
292 13 3/8 4185 c.f. 2720
10802 9 5/8 2375 c.f. 10830
1226 7 414 c.f. 10574-10800
measured 11599'. 11620', 11630'-11653', 11664'-11675', 11682'-11697'
Unit or Property name
Prudhoe Bay Unit
8. Well number
K-14 (23-9-11.14) PBU
9. Permit number
87-95
10. APl number
50- 029-21752
11. Field/Pool
Prudhoe Oil Pool
RECEIVED
APR 1 8 ]990
Alaska Oil & Gas Cons, .Com~
True t~lalJJJajJl~t~ ......
138
2681
8337
8155-8991
true vertical subset
8808'-8872' (four intervals)
Tubing (size, grade, and measured depth) 5 1/2" L-80 surface-2500', 4 1/2" L-80 2500'-10500' with 4 I/2" tailpipe to 10622'
Packers and SSSV (type and measured depth) 9 5/8" TlWpacker at 10500'; 5 1/2" SSSV at 1978'
13. Attachments Description summary of proposal X Detailed operations program
BOP sketch
14. Estimated date for commencing operation
April 1990
16. If proposal was verbally approved Oil X Gas
Name of .~prover Date approved Service
17. I her,e.v~rtify;hat i~pre~ing is t,rue and correct to the best of my knowledge.
Signed ~ ~ ./'~~. ~ Title Supervisor Gravity Draina~le
15. Status of well classification as:
Suspended~
£ ' 0 FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test Location clearance ~
Mechanical Integrity Test ~ Subsequent form required 10-.. ~/-/'
ORIGINAL SIGNED BY
Approved by order of the Commission LONNIE C. SMITH
Form 10-403 Rev 06/15/88
Commissioner
Approved Copy
Returned
Date
J Approval No. ~
Date 41
SUBMIT IN TRIPLIOATE
WELL K-14 (23.09-11-14~ PBU
ADD'L. PERFORATION PROPOSAL
We propose to perforate the following additional interval during April 1990:
11508' - 11515' MD BKB (Ref. BHCS, 9/26/87)
A lubricator will be installed and tested to 3500 psi for all well work. The well will be
returned to production immediately following perforating operations, then tested.
jam
4/12/90
APR 1 8 1990
,.Alaska Oil & Gas Cons. Commission
,.~ Anchorat]e
BOWEN
PAC~OFF
FLOW TUBES
& PACKOFF
]~- HAND
GREASE SEAL
FLOWTUBE
PUMP
FLOWLINE
GREASE LINE
FLOWLINE
VALVE
RISER
GREASE
/--" MANIFOLD
GREASE
PUMP
.-GREASE
RESERVOIR
'BOP
BP EXPLORATION
BP Exploration (Alaskal Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
TO
ARCO
E~ON
PHILLIPS
STATE OF ALASKA
Date: 03/26/90
T#: 80978
SYSTEM Tape & Transmittal 0nly.
ARCHIVES
BP MAGNETIC LIS TAPE & LISTING
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
· ~ /~--~ W-40 CH/TDT-P 03/08/90
Sch#73746 1600bpi
Sch#73751 1600bpi
#1 9904-10550
API#50-029-21776
#1 10796-11764
API#50-029-21752
Tape Pos.#06968
Tape Pos.#06969
Information Control
Well Records LR2-1
J. Dietz/S. McCurry
RECEIVED
APR .[ 0 .Lq,q0
Oil & Gas Co,~s. Commission,
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc,
900 East Benson Boulevard
RO. Box 196612
Anct~orage, Alaska 99519-6612
(907) 561-5111
To: Distribution Date: 03/20/90
Transmittal: 80943
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If
questions, please contact BP Well Records at (907) 564-4445.
you have
C-01 PERF 03/13/90 #1 8774-9100 Sch
K-14 CNL-GR 03/12/90 #1 10800-11745 Sch
M-10 CCL 03/15/90 #1 8440-9856 Atlas
any
St,
5"
5"
Distribution:
.ARCO
CHEVRON
EX/fON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
~STATE OF ALAS..K~
ARCHIVES
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevarct
P.O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
To:
Distribution
Date: 11/28/89
Transmittal: 80626
From:
Sub j ect:
Information Control
Well Records LR2-1
BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
K-14 pRoD-F 11/20/89 81 9900-10250 Sch
F-22 TDT-P 11/17/89 81 9250-9854 Sch 5"
F-22 TEMP & PRES 11/17/89 81 9310-9834 Sch ·
R-6i COMPLETION 11/18/89 81 9046-10501 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
·
· " STATE OF ALASKA
ALASKA ~IL AND GAS CONSERVATION COMMISSION ~:~
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Standard Alaska Production Company 87-95
3. Address 8. APl Number
P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21752
4. Location of well at surface 9. Unit or Lease Name
1909 SNL, 4106 WEL, Sec. 4, T11N, R14E Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
K-14(23-9-11-14)
2750' SNL, 3811' WEL, Sec. 9, T11N, R14E 11. Field and Pool
At Total Depth Prudhoe Bay Field/Prudhoe Bay Pool
3356' SNL, 3852' WEL, Sec. 9, T11N, R14E
5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No.
53.22' I ADL 28303
12. Date Spudded' 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions
9-10-87 9-26-87 12-22-87I N/A feet MSL I One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVDI 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
11,800'MD 8991'TVD 11,756'MD 8963'TVD YES [] NO []I 1978feet MD I 1915'
22, Type Electric or Other Logs Run
Submitted with 10-403 11-4-87. DIL, BHCS, LDT/CNL-poro, LDT/CNL-raw, Laserlog MWD resistivity & TVD
23. CASING, LINER AND CEMENTING R~RD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" Conductor Surface 110' 8 cu yds Concrete
13-3/8" 72# L-80 Butt Surface 1909' 17-1/2"
13-3/8" 72# S-95 Butt 1909' 2720' 17-1/2" 4185 cu fi Arctic Set II
9-5/8" 47# L-80 NSCC Surface 4652' 12-1/4"
9-5/8" 4 7# L-80 Butt 4652' 10, 830' 12-1/4" 2375 cu fl Class G
7" 26# L-80 IJ4S 10,574' 11,800' 8-1/2" 414 cu ft Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET {MD)
3-1/8" HSC Densijet at 4 spf 4-1/2" 12.6# L-80 10,485' 10,501'
MD TVDss
11,599'- 11,620' 8808'-8822' 5-1/2" 17# L-80 1997'
11,630'- 11,659' 8829'- 8848' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
11,664' - 11,675' 8851' - 8858' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11,682'- 11,697' 8863'- 8872' 13-3/8" X 9-5/8" Downsqueeze 13-3/8" x 9-5/8"
Annulus with 300 sx Arctic Set I
followed by 125 bbls crude oil
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing. gas lift, etc.)
12-22-87 I FIowing
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD I~
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE I~
28. CORE DATA
Brief description ol lithology~ porosity, lractures, apparent dips, and presence ol oil, gas or water. Submit core chips.
, ,
..... . ,.
;.,' ..... ~....~ ....
~ , ... ,. .
Submit in duplicate
Form
10-407
Rev. 7-1-80 ~INUED ON REVERSE SIDE
29. ', 30. °
GEOLOGIC MARKERS - ' r~RMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Sag 10,868' 8364'
Shublika 10,955' 8426'
Zone 4 10, 982' 8445'
(Top Ivishak)
Sadlerochit)
31. LIST OF ATTACHMENTS
32. I hereby cedify that lhe foregoing is true and correct to the best of my knowledge
Signed <~~~ T i t l e Pt~U l~ri/lin¢ En~,peerin¢ ~u.~ervisor D at e ~,/'/i/~;~''''
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
INITIAL PERFORATING DATA - Well K-14
12/20/87
Pressure tested tubing and inner annulus.
12/22/87
Installed and tested lubricator to 3500 psi. Rigged up
Gearhart and perforated the following intervals for
initial production using 3 1/8" HSC Densijet guns at 4
spf:
11599' - 11620' MD BKB (8808'-8822' TVDss)
11630' - 11659' MD BKB (8829'-8848' TVDss)
11664' - 11675' MD BKB (8851'-8858' TVDss)
11682' - 11697' MD BKB (8863'-8872' TVDss)
Ref. BHCS/GR, 09/26/87.
Put well on production.
02/01/88
Set and tested initial SSSV in ball valve nipple at
1978'.
02/02/88
Shut in well to prepare for static pressure survey.
02/04/88
Ran initial static pressure temperature survey at 8800'
TVDss.
jm(02/22/88)
0755Z
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report -- PRUDHOE BAY
September 11, 1987 at 0600 hrs
STANDARD
ALASKA PRODUCTION
Current Operation:
Mud Type: Spud
Drilling 17-1/2" hole.
0600 Depth: 1215'
Day: 1
24-Hour Ftg: 1125'
Water Used: 2800
Accepted rig at 0400 hrs on 9/10/87.
Drill to 1016'. Trip. Drilling at 1215'.
Spud at 1330 hrs on 9/10/87. Drill to 505'. Trip.
WT: 9.0 VIS: 150 PV: 15 YP: 41 FL: 16 Solids: 5 Temp: 43°F
ANGLE DIRECq"ION 7¥D SECTION COORDINATES DLS
STANDARD
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K-14
Daily Drilling Report -- PRUDHOE BAY
September 14,' 1987 at 0600 hrs
Current Operation:
Mud Type: Gel
SURVEY ,MD
8 1910
10 2098
12 2351
14 2573
16 2823
18 3042
2O 3230
0600 Depth: 3430'
Day: 4
72-Hour Ftg: 1000'
Water Used: 5400
Drilling and jetting.
Drill to 2741'. Short trip. Ran 13-3/8" casing to 2717' and cemented with 4500 sks
Arcticset II. NU and test wellhead and BOPE. RIH and test casing to 3000 psi. Drill to
2755' and ran FIT to .65 psi/ft. Drilling at 3430'.
WT: 8.8 VIS' 35 PV: 5 YP: 6 FL: 18 Solids: 3.5 Temp: 67°F
ANGLE DIRE~'TION TVD SECTION COORDINATES DLS
4.50 S28E 1909 19 S19 E.50 3.19
9.25 S23E 2096 41 S40 El3 2.90
17.3 S5.8E 2342 96 S95 El3 5.47
25.0 S7.5E 2549 175 S174 E23 3.51
32.4 S 1.9E 2768 297 S295 E37 3.36
36.5 S4.4W 2948 422 S420 E32 .96
38.4 S 1.5E 3096 537 S536 E31 .22
STANDARD
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report -- PRUDHOE BAY
September 15, 1987 at 0600 hrs
Current Operation:
Mud Type: Gel
21 3324
22 3482
23 3610
24 3705
25 4005
26 4447
27 4763
28 5078
29 5395
0600 Depth: 5930'
Day: 5
24-Hour Ftg: 2500'
Water Used: 1400
Drilling 12-1/4" hole.
Drill to 3751'. Trip. Drill to 4206'. Trip for broken bit nozzle. Drilling at 5930'.
WT: 9.2 VIS: 36 PV: 7 YP: 9 FL: 15.2 Solids: 6.5 Temp: 68°F
ANGLE DIRECq'ION 'I'VD SECWIQN COORDINATES DLS
40 S6.5E 3169 596 S595 E36 3.82
43 S7.5E 3287 701 S700 E49 1.94
46 S8.9E 3378 791 S789 E62 2.47
48 S8.9E 3443 860 S857 E72 2.11
50 S7.9E 3637 1085 S1080 El05 0.57
49 S6.5E 3927 1431 S4413 E149 0.27
47 S4.0E 4138 1656 S1648 E168 0.78
47 S2.2E 4332 1887 S1873 El81 0.46
47 S5.4E 4568 2119 $3110 S136 0.71
STANDARD
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report -- PRUDHOE BAY
September 16, 1987 at 0600 hrs
Current Operation:
RIH.
0600 Depth: 7164'
Day: 6
24-Hour Ftg: 1234'
Water Used: 1100
Drill to 6417'. Trip. Drill to 7164'. Trip.
Mud Type: Gel WT: 9.4 VIS: 58 PV: 7 YP: 11 FL: 12 Solids: 8 Temp: 78°F
SUR.VI~Y ~tD ANGLE DIRECTION TVD SECTION COORDINATES DL.q
30 5864 46.5 S2.9E 4889 2462 S2452 E221 0.43
31 6342 47.0 S0.7W 5216 2889 S2800 E224 0.59
32 6814 48.3 S3.7W 5534 3155 S3148 E213 0.52
33 6939 48.3 S4.1W 5617 3247 S3241 E207 0.74
34 7065 48.4 S4.8W 5701 3340 S3335 E200 0.42
~TANDARD .
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report -- PRUDHOE BAY
September 17, 1987 at 0600 hrs
Current Operation:
Drilling.
0600 Depth: 7430'
Day: 7
24-Hour Ftg: 266'
Water Used: 1050
Dynadrill to 7417'. Trip. Drilling at 7430'.
Mud Type: Gel WT: 9.4+ VIS: 34 PV: 5 YP: 6 FL: 7.2 Solids: 8 Temp: °F
SURVEY MI) ANGLE DIRECTION Wv'D SECTION COO~A~ DLS
Rig: Nabors 18E
Well: K-14
Daily Drilling Report -- PRUDHOE BAY
September 18, 1987 at 0600 hfs
AFE # 120556
STANDARD
ALASKA PRODiJCTION
Current Operation:
0600 Depth: 8367'
Day: 8
24-Hour Ftg: 937'
Water Used: 1225
Drilling.
Drill to 8335'. Trip. Dyna-Drilling at 8367'.
Mud Type: Gel WT: 9.5 VIS- 34 PV: 7 YP: 7
SURVEY MD
ANGLE DIRECYION TVD
FL: 6 Solids: 8.5 Temp: °F
SECTION
35 7445 45.3 S0.9W 5961 3617
36 7759 45.8 S0.6W 6180 3840
37 7917 46.0 S0.2W 6290 3954
38 8168 45.4 S0.1E 6466 4133
C(X)RDINATES ~
S3612 E186 1.11
S3836 E183 0.17
S3950 E182 0.22
S4129 E182 0.25
STANDARD
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report -- PRUDIlOE BAY
September 21, 1987 at 0600 hfs
AFE # 120556
Current Operation:
Mud Type: Gel
40 8548
41 8768
42 9073
43 9361
44 7618
45 9962
46 10174
~ Depth: 10290'
Day: 11
72-Hour Ftg: 1923'
Water Used: 1400
RIH with #3 Dyna-Drill.
Dyna-Drill to 8501'. Trip. Drill to 9419'. Trip. Drill to 10290'. Trip for Dyna-Drill.
WT: 9.7+ VIS: 36 PV: 7 YP: 7 FL: 5.8 Solids: 10.5 Temp: 78°F
ANGLE DIRECTION TVD SECTION COORDINATES DLS
45.4 S7.2E 6734 4402 S4399 E192 2.12
45.4 S6.5E 6889 4559 S4555 E211 0.34
46.2 S6.8E 7101 4778 S4972 E236 0.21
45.9 S5.4E 7301 4985 S4978 E258 0.37
45.8 S5.5E 7522 5213 S5201 E303 0.08
45.2 S2.6E 7721 5415 S5407 E293 0.66
45.4 $0.5W 7870 5565 S5558 E295 1.08
Rig: Nabors 18E
Well: K-14
Daily Drilling Report -- PRUDItOE BAY
September 22, 1987 at 0600 hrs
AFE # 120556
STANDARD
ALASKA PRODUCTION
Current Operation:
Mud Type: Gel
47 10.2
48 10.3
Drilling.
0600 Depth: 10290'
Day: 12
48-Hour Ftg: 273'
Water Used: 1400
RIH with Dyna-Drill. Could not get past sidetrack hole at 7411'. Trip for BHA. RIH with
locked assembly. Drilling at 10,563'.
WT: 9.8 VIS' 38 PV: 8 YP: 7 FL: 5.6 Solids: 11 Temp: °F
ANGLE DLRE~ON TVD SECTION COORDINATES DLS
46.1 S2.0W 7897 5593 S5586 E294 3.06
46.4 S3.4W 8006 5706 S5699 E289 0.67
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report -- PRUDHOE BAY
September 23, 1987 at 0600 hrs
AFE # 120556
STANDARD
ALASKA PRODUCTION
Chm'ent Operation:
Mud Type: Gel
49 10530
50 10689
51 10750
TD 10835
0600 Depth: 10835'
Day: 13
48-Hour Ftg: 272'
Water Used: 680
RIH with 9-5/8" casing.
Drill to 10835'. Short trip. CBU. POH. Running9-5/8" casing.
WT: 9.9 VIS: 40 PV: 11 YP: 8 FL: 5.6 Solids: 12 Temp: °F
ANGLE DIRECTION TVD SECTION C(X)RDINATES
45.8 S3.7W 8116 5820 S5813 E282
44.8 S3.7W 8228 5932 S5926 E274
44.3 S5.1W 8271 5974 S5965 E271
44.3 S5.1W 8332 6033 S6028 E266
0.40
0.63
1.61
0
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report -- PRUDHOE BAY
September 24, 1987 at 0600 hrs
AFE # 120556
STANDARD
ALASKA PRODUCTION
Current Operation:
Mud Type: Gel
0600 Depth: 10835'
Day: 14
48-Hour Ftg:
Water Used: 1375
Cixculate and condition mud.
Ran 9-5/8" casing to 10827' and cemented with 2375 cu. ft. Class G. Installed and tested
packoff. Tested BOPE. RIH and drilled FC. Tested casing to 3000 psi. Drill to 10835'.
CBU.
WT: 9.8 VIS: 39 PV: 10 YP: 8 FL: 6 Solids: 11.5 Temp: °F
ANGLE DIRECqlON TVD SECTION COORDINA~S DLS
STANDARD
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K-14
Daily Drilling Report -- PRUDHOE BAY
September 25, 1987 at 0600 hrs
AFE # 120556
Current Operation:
Drilling 8-1/2" hole.
0600 Depth: 11,485'
Day: 15
48-Hour Ftg: 650'
Water Used: 940
Drill 8-1/2" hole to 11,22'. Short trip. Drilling at 11,485'.
Mud Type: Gel WT: 9.0 VIS: 40 PV: 7 YP: 8 FL: 4.4 Solids: 5 Temp: 93°F
SURVEY MD ANGLE DIRECq'ION ~ SEC'rlON COORDINA~ DLS
STANDARD
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report -- PRUDHOE BAY
September 28, 1987 at 0600 hrs
AFE # 120556
Current Operation:
0600 Depth: 11,800'
Day: 18
48-Hour Ftg: 315'
Water Used: 1825
RIH with 6" bit.
Drill to 11,800'. Ran open hole logs. Made wiper trip. Ran 7" liner to 11,798' and
cemented with 360 sks Class G. Clean out cement from 10,435' to TOL at 10,567.
Mud Type: Gel
WT: 9.0 VIS' 43 PV: 8 YP: 8 FL: 4.6 Solids: 5.5 Temp: °F
ANGLE DIRECTION .TVD SECWION COORDINATES DLS
Rig: Nabors 18E
Well: K-14
Daily
Drilling Report --
September 29, 1987
AFE # 120556
PRUDHOE BAY
at 0600 hrs
STANDARD
ALASKA PRODUCTION
Current Operation:
Mud Type: Gel
0600 Depth: 1 1,756'
Day: 19
24-Hour Ftg:
Water Used: 1205
Slip and cut drilling line.
Clean out to 11756'. Displace to NaCI.
WT: 9.6 VIS: PV: YP: FL:
Solids:
Temp: °F
STANDARD
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K-14
Daily Drilling Report -- PRUDHOE BAY
September 30, 1987 at 0600 hfs
AFE # 120556
Current Operation:
0600 Depth: 11,756'
Day: 20
24-Hour Ftg: '
Water Used: 500
Displacing robing with diesel.
Ran 4-1/2" robing. NU and test tree. Displace robing with diesel
Mud Type: Brine WT: 9.6 VIS:
PV: YP: FL: Solids:
Temp: °F
STANDARD
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report -- PRUDHOE BAY
October 1, 1987 at 0600 hfs
AFE # 120556
Current Operation:
06(X) Depth: 11,756'
Day: 21
24-Hour Ftg: '
Water Used:
Released rig.
Displaced tubing with diesel. Set and tested packer. Released rig at 1000 hrs on 9/30/87.
Mud Type:
WT: VIS: PV: YP: FL: Solids: Temp: °F
STANDARD ALASKA PRODUCTION CO.
P/3,D- K (23~-9. II-14)
K'I4
Controlled
Drilling
Consultants,
Inc.
LES HENDERSON
3334552
CONTi,.,,LLED DRILLING CONSULTANTS, INC.
· 4234 I(~NGSTON. DR..
. Anchorage, Alaska 99504
· (907) 333-1552
October 5, 1987
Mr. Brian Rose
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, AK 99502
RE.~ Magnetic Single Shot Survey
Job No. 0987-010
Well K-14 (23-9-11-14)
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: 09-10-87 to 09-22-87
Dear Mr. Rose:
Please find. enclosed the "Original" and six (6) copies of our
Magnetic Single Shot Survey on the.above well. The method used
in calculating this survey was Radius of Curvature. The depth
of the survey was 493 to 10,835.
Thank you for giving, us this opportunitY to be of service.
Yours very truly,
Controlled Drilling Cons~l,~nts, Inc.
T~rry V. Henderson
Directional Supervisor
STANDARD ASKA PRODUCTION COMPANY
MAGNETIC SINGLE SHOT SURVEY
RADIUS OF' CURVATURE METHOD OF CONPUTAT~ON
COMPUTED FOR CDC ~Y O~E~NTECN
WELL K-i ~
KB ELEY 52,22 FT,
SURVEY DATE 09,,'i0287
PROPOSED
RECORD OF SURVEY
TRUE
HE~$, DRIFT VERTIr.;~L,
DEPT~ ANGL~ DEPTH
D H
SEA
DRIFT
DEG,
TOTRL COORDINATES
CLOSV
f-:t~.S,,~I'~ED VERT I C~L TO
OFT,
734 0 45
974 0 45
172~ 0 0
t817 1 45
19~ 0 4 30
209S 9 15
2225 1 2 0
2351 !7
2479 2t 42
2573 25
2691 29
294~ ~5 42
3642
3137
492,99
733,98
973.96
!275.94
i582,93
!722
~816
I909
2004
2096
2220
2342
2463
2549
2654
2768
9~
92
77
i9
14
95
81
44
73
75
!2
287i
2947,62
u~,~, 94 2969
-53.22 N
4~9,77 823
880,76 $22.
92 O. 74 925,
1222,72 $
~529,7t S12.
i669,71 S ,
J763,70 S 5,
J856,55 S28,
i 950,97 939.
2 842,92
2J67,73 8t2,
2~89,59 S 5,
24 ! O. 22 S 7,
2714,90 S
28t8,45 S
2894,40 S 4
,72 S
OOE
OOE
OOW
OOE
OOE
OOE
OOE
OOE
OOE
80E
50E
9DE
70W
50E
1.98 S
4,54 S
7,42 S
J. O, 63 8
t2,92 S
~4,35 S
~9, i8 S
27,79 S
39,70 S
62.6S S
94,3S 8
t 36 , 76 S
t73, "~
-8 95 S
¢.>4,25 S
364, ~ 9 S
4.~9,44 S
4 77,29 S
535, !6 S
.. 9::~
,6i
97
13 83
t6 04
19 27
24
3~ ,34
36, O!
32,~0
30.63
2
7
I0
i2
t2
t4
42
64
175
229
296
365
420
478
E E S
O ~ $
SEVE:: I TY
D~:C:,/i 0 OFT
,
. i OJ
i 79
:2 96i
4i 6
47'i
44:2
3,560
3, 049
3,276
,2!5
SOHIO WELL K-I4 SINGLE SHOT SURVEY JO8 NO A--O'~87-Otv COHPU~.~,~-. 24 .~EP 87
K8 ELFV 5''~'
MEAS. DRIFT
D M
37 05 48
4005 49
4447 49
4763 47
5335 47
5865 46
6342 47
6814 48
6~39 48
7065 48
7~45 45
7759 45
7917' 46
8168 45
8263 44
8548 4~
8768 45
9873 46
9361 45
9679 45
~962 45
0174 45
I0214 46
0371 46
6
42
0
48
24
0
18
24
t8
48
24
48
24
0
t2
54
48
24
24
TRUE
VERTICAL
DEPTH
3286,65
3377,78
3442,44
392.7,58
4~52,62
4568
4889,25
5534,04
5617,19
5700,~3
5960,78
6180,67
~29 O,
6465,93
6532
6734, ~ 6
6899, i 8
71 02,57
7362,45
7523,95
7722: 3 I
7871 ,43
78~9
8007,91
SUB
SEA
3389.22
4 084,98
4299,4 O
4515, i9
'548~, 82
~5~3.97
~647,7 ~
5907,5S
6127,45
6237.4 ~
6412.71
~36E: O, 94
7 049, ~
74~ O, 7~
~6~9,09
~818,2~
7846, ~ 2
7954,69
-,~ ~.,r. r~F ~URVE~~
DRIFT
DiREC
TOTAL. COOEDINATES
5'3E 594,47 S ~6,29
5OE 698,58 S 49,
OE 787,52 S 81,99
OB 856,27 S 72.66
OE t'O79.SJ S 105.68
6,50E 1412,6e S t47,7i
OE I647.!5 $ 169,26
5,40E 2109,23 S t97,
OE 2451,76 S 221 ,98
9OW 2799.87 $ 228,
~.TOW 3~47.58 S 234,05
0~ 7240.69 9 207,70
OW ~334,56 $ 200.40
O~I Sd.t!.36 S !86,62
OW ~835,49 S t83,68
20W ~.,4~¢:,9~, S ~8z.89
OE 4!28.59 S t82,73
Oki 4~95,88 S 182.
7,20E 4:~97,30 S 192,41
5OE 4552 2~ S 2t!
80E 4768,74 S 236,26
40E 4974.98 $ 258,29
OE 5202,1t S 279,I7
OE 540S,49 9 292,
OW 5554, t4 S 295,35
OW 5-8~,78 S 294 70
OW 5696,06 9 289,
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C L 0 S
D~STANCE
789,95 S
1428,30 S
I655,83 $
1886,32: S
2118,42 S
246I. 79 S
3154,85 S
3247,34 S
3340,57 S
~6t6, ~8 S
3839.89 S
7953.19 S
4J32 63 S
4~99 92 S
440i 51 S
4557 18 S
4774 58 S
4981 60 S
5209 60 S
54~ ~, 4~ S
~561,99 S
~590,56 S
3783.41 S
A N G L E
,~57
240
,663
'75S
5 ?9
4 ~ 9
430
!67
967
527
~,<.~
77 !
,505
S9t5- ~--'
I ¢~: >35 . 'i"'P .....
246 0";
:?.8 07,7? ....
3~S9", 5S .....
39S~, 7 .....
4 i99: i~- .....
455 ~,: 66-
4>'74 24 ....
498i , 37 .....
541 i ~ .....
SOHIO cELL
JO~ HO
CONPUTER-
RECORD OF ~URV~
TRUE
NEA$. DRIFT VERTICAL SUB DRIFT
DEPTH ANGLE DEPTH SEA OlREC
D M DEG.
i85~;0 45 48 8~8,~ ~'064,94 S
0689 44 48 82~9,99 8t76,77 S S'.70W
~0750 44 ~8 8~-~',~,46 6220~ ,24. S 5,iOW
THE FOLIOWIN~ IS EXTRAPOLATED ".FO TD
BOTTOM HOLE CLO.JRE 60.~ 88
~.HL COORDINATES
5810.41 ~ 282.27 E
~.~,8o 8 27I~9 E
FEET AT S 2 3I 54 E
CLOSURES
8T~qNCE AH
DOG LEG
DE(~' ..... i O OFT r, ~ ~"'.-~ ~,~ ~ ~,,'.-~.- ?,., .. -
~ '$8 7'
...,~6LE SK~.~T SURVEY JOB ~,.~4'* A-0987~8t¢
SOHIO ~ELL K-14 St~ ~ ' ~
i',iEA~UREg DEPTH ANb OTHER DATA
DE;PTH
0
I
1954
2156
225~
2~62
2689
~80S
~92~
~304
J4J7
3575
TRUE
VERTICAL SUB HD.-TV[:,
DEPTN SEA DIFFERENCE
65~, 600 O
853, 80 (~ O
1353, J 300 0
J453, 1400
J557, ~500
16~:¢, 16 O 0 O
i 753, ! 7 00 0
J853, I800
19SS. ~900 0
20~, 2000
2153, 2! 00 2
2253, 2200 4
2353, 2300
2453, 2400 !4
2553, 2580 23
26~, 2600
2P5~, 2700 ~2
2853, 2900 72
2953, 290O 95
3053, 3000
3t53, ~I O0 150
3353, 3300 22t
345~. 3400 2~7
CORRECT l ON
0
o
0
0
0
o
o
0
0
o
0
4
6
9
~6
20.
~?
38
4.6
TOTAL COORDINATES
,O,S S
,89 H
,42 S
i.48 s
2,5~ s
3,58 $
4,78 S
5,98 S
7,!8 S
9,4,5 S
¢0,43 S
11,26 $
ii,94 s
i2,48 S
t2,84 $
i3,07 $
15,78 S
22,65 S
~3,69 S
49,27 S
97,59 S
i 32.77 S
i~5 31 S
226: 1 2 S
284,89 S
J51,ll S
4'23,58 S
496,32 S
581,75 S
6¢8, 03 S
762,67 S
868, ! 6 S
.i6 E
! ,.oi E
!,07 E
,,
.96
10 75 E
16 40 E
~4 8~ E
!4 6~> E
i~ 76 E
2~, 'J5 E
~ i '"~ '~ F
36 , 71 E
:~4 S:'~
45,i4 E
58,i0 E
74 P; '''>
SOHIO ~ELL
MEAS JR~D
DEPTH
4486
5O79
5~5
552O
6397
6544
~84~
6993
7290
7434
7577
7720
7863
8007
8150
8292
8433
8575
0717
~859
~,. ,;.~ SURVEY JO9
AND, OTHfr.~. DATA FOF: EVER? E~,;E~4 I O0 FEET OF
TRUE
VERTICAL SU8 HD.....TVD VERT!C'AL
D~,.TH SE~ DZFFERENCE CORRECTION
3753, 3700 426 54
3853, 3800 480 54
4053, 4000 583 5~
4153, 4!80 ~31 48
4253, 4200 679 48
4353, 4~88 725 46
4453, 4480 772 47
455~, 4500 819 47
465~, 4600 866 47
4753, 4700 9'i3 47
4853, 4~OO 959 46
4953. 4900 I 004 45
5053, 5000 i 050 46
5!53, 51 00 I 89~ 46
5253, 5200 t~4g 47
5~53, 5300 t190 47
5453. 5400 ~239 49
5553. 5500 ~289 50
5653, 5600 1339 50
5753. 5700 !790 51
5853. 5~08 ~ 437 47
95.3 5900 ~ 481 44
~853, 6088 i523 42
6153, 6100 ~566 43
6253. 6288 1609 43
6353. 6~00 ~653 44
6453. 6400 i696 43
6553, 6500 ~738 42
6653, 6600 ~779 4~
6753. 6700 I82t 42
~853, 6800 ~63 42
6953, 6900 ~985 42
SUB SE~ DEPTH,
C 0 f'l P U T E R" -
i<8 ELEV
'tOTAL COORDIN,qTr:C'
. . ~.~,~
98 O. 28
12i
1327,37
'~553,99
16$3,44
~77J.30
1985.06
2 092
228
23 07,72
2413.78
2519.22
~625.2 O
279 ~, 79
2839, O0
2947,53
3057,56
3!69.86
3281,07
3392,6~
3500,32
37 05, t O
3~07,30
391 0,3t
4115
42!5,99
4.S~5,96
44t6,46
45i 6,5i
91,
137. ?4
161 ,9~
i76,98
1=¢ ,
22?,$8
227,30
224: 15
~i9
9i 2
204. ?0
189. ::~0
i 85, ~5
183,99
i83.
182 7:2
I :~ 2 ? i
t 94, E, i
206.'.¢0
2 'i 8, ::.~ 7
SOHIO i~lELL K-!4
MEASURED DEPTH
D!E~SU'RED
DEPTH
9002
94~4
~0292
07~
AND OTHER DATA FOR EVERY EVEN t00 FEET OF
TRUE
VERTICAL. SUB ND-TVD
DEPTH SEA DIFFERENCE
'VERTICAL
CORREOTiOH
7353, 7300 2080
7453, 7408 2i24
755~, 7500 21~?
7653, 7608 2210
??53, 7700 2252
8i53, 8iOO 2426
8253, ~200 2468
8534, ~28i 2500
4.~
44
44
44
44
42
42
44
45
42
NO A'"'t.~,¢-Oi,..~ ~..,uf4, FdTER- 24 ""*-":
K8 E;LE? 57.2:'2
SUB SE~ DEPTH,
TOTAL COORDIHRTES
47!?,8~ S 2S0,2S
4924,27 $ 25~,3~
5827,88 $ 263.~9
5~33,77 S 289,04
54~4,~6 S 293,96
56~8,87 $ 292,40
5747,3~ $ 286,~0
5e46,20 $ 279-95
5946,04 S 27S.S5
.9OHIO !.~IELL K~i 4
SINGLE
SHOT SURVEY
)
JO9 NO
CO~,IPU TER-.-
KB EL~:V
4
INTERPOLATED VALUES FOR EVEN
TRUE
MEASURED VERT I CAL
DEPTH DEPTH
0
3000 2914,
6000 4982,
7~00 5658,
SOOO 6348.
9000 7052,
{OOOO 7749.
J0835 0334,
?
947.
4246,
4929,
6999,
8281,
FEET OF MEASURED DEPTH,
'TOTAL COORDiHAT~S
7,73 s
2549,7i 9 226
4008,56 $
47i~,54 S 230,
5430,44 S
6024,99 $ 266,
O0
52
94
34,
02
77
87
i ':
i
HORIZONTAL VIEW',
'-STANDARD ALASKA PROI~UCTION CO.
WELL K? 14 (.25-9-11-1~)
RADIUS IOF. CURVATURE.
MAGNETIC SINGLE -SHOT
SCAL~, I"= ,ooo,
.
· .
· . .
ALL DEPTHS S~OWN ' i ' '
ARE TVD
~¢ TELECO] Teleco Oilfield Se, ;s of Alaska Inc.
6116 Nielson Way
-~ Anchorage,99§02 AK
(907) 562-2646
September 25, 1987
JOB #587
STANDARD ALASKA PRODUCTION CO.
WELL: K-14
PRUDHOE BAY UNIT
RIG: NABORS 18E
Attached please find a copy of the computer calculated MWD
directional surveys for the above mentioned well.
Teleco appreciates this opportunity to provide service to
Standard Alaska Production Company.
Teleco is committed~ to providing the highest quality MWD service
and we would welcome any comments or questions concerning these
surveys or any of our other services.
Sincerely, ~
Dave Reimer
Field Service Supervisor
DR/el
Enclosures
RECEIVED
A ,~T~IAT COMPANY
TELECO OILFIELD SERVICES
JOB 587 SURVEY CALCULATONS
Date
Page
09/24/87
Company: S.A.P.C.
Well: K-14
Location: PRUDHOE BAY
Rig: NABORS 18-E
TELECO Job # 587 TAK
Grid Correction:
Magnetic Declination:
Total Correction:
Proposed Direction:
0.00 degrees
30.80 degrees
30.80 degrees
176.46 degrees
RADIUS OF CURVATURE CALCULATION
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION ~ N/S E/W D~ST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100 '
****************************************************************************************************
TIE INTO GYRO SURVEY
2225.00 12.0 192.0 S 12 00 W 2220.96 63.99 62.87S 15.74E 64.81 S 14.056E 0.000
TELECO MWD SURVEYS
2573.00 25.0 172.5 S 07 30 E 2549.73 175.05 173.91S 23.81E 175.53 S 7.796E 3.511
2691.00 29.2 172.1 S 07 54 E 2654.76 228.65 227.17S 31.01E 229.27 S 7.774E 3.563
2823.00 32.4 178.1 S 01 54 E 2768.12 296.18 294.47S 36.78E 296.76 S 7.120E 3.358
2479.00 21.7 172.5 S 07 30 E 2463.44 137.88 136.97S 18.97E 138.28 S 7.885E 3.466
2351.00 17.3 174.2 S 05 48 E 2342.82 95.23 94.55S 14.02E 95.58 S 8.437E 5.473
TELECO Job # 587 TAK .~ 09/24/87 Page 2
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100 '
****************************************************************************************************
2948.00 35.7 183.7 S 03 42 W 2871.68 365.92 364.41S 35.68E 366.16 S 5.592E 3.639
3042.00 36.5 184.4 S 04 24 W 2947.63 420.82 419.66S 31.77E 420.86 S 4.329E 0.958
3137.00 38.6 178.5 S 01 30 E 3022.94 478.47 477.51S 30.30E 478.47 S 3.632E 4.381
3230.00 38.4 178.5 S 01 30 E 3095.72 536.33 535.38S 31.78E 536.33 S 3.398E 0.221
3324.00 40.1 173.5 S 06 30 E 3168.52 595.78 594.69S 35.93E 595.78 S 3.458E 3.819
3482.00 43.1 172.5 S 07 30 E 3286.65 700.47 698.80S 48.71E 700.49 S 3.988E 1.945
3610.00 46.1 171.1 S 08 54 E 3377.78 790.04 787.74S 61.53E 790.14 S 4.466E 2.466
3705.00 48.1 171.1 S 08 54 E 3442.45 859.33 856.50S 72.26E 859.54 S 4.823E 2.106
4005.00 49.7 172.1 S 07 54 E 3639.65 1084.58 1080.14S 105.28E 1085.26 S 5.567E 0.589
4447.00 49.0 173.5 S 06 30 E 3927.59 1419.22 1412.82S 147.31E 1420.48 S 5.953E 0.288
4763.00 47.4 176.0 S 04 00 E 4138.21 1654.66 1647.38S 168.86E 1656.01 S 5.853E 0.777
5078.00 46.8 177.8 S 02 12 E 4352.63 1885.39 1877.78S 181.34E 1886.52 S 5.516E 0.460
5395.00 47.4 174.6 S 05 24 E 4568.41 2117.57 2109.45S 196.72E 2118.61 S 5.328E 0.763
5865.00 46.5 177.1 S 02 54 E 4889.25 2460.98 2451.98S 221.58E 2461.97 S 5.164E 0.433
6342.00 47.0 180.9 S 00 54 W 5216.08 2808.01 2799.29S 227.64E 2808.53 S 4.649E 0.590
6814.00 48.3 183.7 S 03 42 W 5534.04 3154.98 3147.80S 213.64E 3155.04 S 3.883E 0.518
6939.00 48.3 184.1 S 04 06 W 5617.20 3247.52 3240.91S 207.29E 3247.53 S 3.660E 0.239
TELECO Job #
587 TAK 09/24/87 Page 3
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100'
****************************************************************************************************
7065.00 48.4 184.8 S 04 48 W 5700.94 3340.76 3334.77S 199.99E 3340.77 S 3.432E 0.424
7445.00 45.3 180.9 S 00 54 W 5960.79 3616.18 3611.58S 186.20E 3616.38 S 2.952E 1.107
7759.00 45.8 180.6 S 00 36 W 6180.68 3839.70 3835.71S 183.27E 3840.08 S 2.736E 0.173
7917.00 46.0 180.2 S 00 12 W 6290.63 3952.90 3949.17S 182.48E 3953.38 S 2.646E 0.221
8168.00 45.4 179.9 S 00 06 E 6465.93 4132.19 4128.81S 182.32E 4132.83 S 2.528E 0.254
8263.00 44.8 181.3 S 01 18 W 6532.99 4199.31 4196.10S 181.61E 4200.03 S 2.478E
8548.00 45.4 172.8 S 07 12 E 6734.16 4400.99 4397.52S
8768.00 45.6 173.5 S 06 30 E 6888.37 4557.64 4553.32S
191.99E 4401.71 S
210.71E 4558.19 S
1.220
9962.00 45.2 177.4 S 02 36 E 7720.35 5413.38 5405.63S 292.53E 5413.54 S 3.098E 0.665
10174.00 45.4 180.6 S 00 36 W 7869.47 5563.91 5556.28S 295.16E 5564.12 S 3.041E 1.077
10214.00 46.1 182.0 S 02 00 W 7897.38 5592.45 5584.92S 294.51E 5592.69 S 3.019E 3.058
10371.00 46.4 183.4 S 03 24 W 8005.95 5705.19 5698.21S 289.17E 5705.54 S 2.905E 0.672
10530.00 45.8 183.7 S 03 42 W 8116.20 5818.88 5812.56S
10689.00 44.8 183.7 S 03 42 W 8228.04 5930.99 5925.34S
9679.00 45.8 174.9 S 05 06 E 7521.99 5211.55 5204.25S 278.98E 5211.73 S 3.069E 0.075
9361.00 45.9 174.6 S 05 24 E 7300.50 4983.48 4977.04S 258.10E 4983.72 S 2.969E 0.365
282.08E 5819.40 S 2.778E 0.401
274.74E 5931.70 S
9073.00 46.2 173.2 S 06 48 E 7100.62 4776.34 4770.87S 236.07E 4776.71 S 2.833E 0.209
2.650E 0.245
2.655E 0.629
2.500E 2.122
TELECO Job # 587 TAK 09/24/87 Page 4
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100'
****************************************************************************************************
10750.00 44.3 185.1 S 05 06 W 8271.51 5973.38 5968.00S 271.46E 5974.17 S 2.604E 1.807
S~rvic~_s
0
0
800
800 1600 2400 B200 4000 4800
.... :~-~-z]~--;~ .... t ...... t---r'~7 ..... ~ ..... ~ ..... ] ...... T--] ..... : ...... r'-~ ...... ? ....... ~ ..... ' ..... t ...... ~ ...... ~--F-~ .... ~'" ...... , ........ ~ .... :'"? ....
' '-"i ............ : ...... i -1' ...... ~ .... ; ..... : .............. i ~ ..... ~ ......... '"'. ...... ' .......... ~" ........... [ ...... ; .............. , .......... .: ......
] ~_i ; ...... i .... _} ..... :...: .... i : ..... :: .... !...i ..... Pe.L!...~.HOE!_.~A..¥. ....... i ...... i..7_ ..:_ .,. .......
................... N_.A. BOR_S._....ii 8~.-__.E.'_ .............................
....................................... JO~# .... 587. !T^K/
, · ....... 7 .... ~' ' .... '
6400
7200
1
r': -: ..... ,;- ;""t ; ........................ 1 ...... ~- ...... ~ ......... ~ ...... 1 .... : .... ~ .... '.." '- 'I ...... : -t .... : '-~
i ~ ! ~ ? . , ·i ~ . ~ i : ~ , i i I ' ' I
EAST (St:)
TELECO 0 ~ ] ~ ~ a ] d Sarv ~ cas
VERTICA! PROJECTION
0
2000
3000
4000
5000
6000
7OOO
8000
§000
10000
I 1000
1000 2000 3000 4000 5000 6000
VERTICAL SECTION
$ UB.$ URFA CE
DIRECTIONAL
SURVEY
~UIDANCE
F~ONTINUOUS
r~"]OOL
Gas Cons. Com[ni'ssJo~
.Anchorage
Company STANDARD ALASKA PRODUCTION C..OMPANY
Well Name K-14.(1909'.. SNL, 1174'.. .EWL,SEC, 4,TI..1N.~R1.4E.)
Field/Location PRUDHOE BAY,, NgRTH SLOPE, ALASKA
i i ii
Job Reference No.
72482
Loaae~ BY:
RATHERT
Date
30-0CT-87
Computed By:
KRUWELL
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
STANDARD ALASKA PRODUCTION CO.
K-14
PRUDHO:~ BAY
NDRTH SLOPE~ALASKA
SURVEY DATE: 30-OCT-BT
ENGINEER: J. RATHERT
METHODS OF COMPUTATION
TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH
INTERPOLATION: LINEAR
VERTICAL SECTION: HgRIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH DF SOUTH 3 DEG 30 MIN EAST
STANDARD ALASKA PRODUCT[ON CO.
K-14
PRUDHOE BAY
NORTH SLOPE,ALASKA
COMPUTATION DATE: 3-NOV- 87
PAGE 1
D~TE OF SURVEY: 30-0CT-87
KELLY BUSHING ELEVATION: 53.22 FT
ENGINEER: J. RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL. DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
0.00 0.00 -53.22 0 0 N 0 0 E
100.00 100.00 46.78 0 8 N 16 27 E
200.00 200.00 146.78 0 6 S 28 57 E
300.00 300.00 246.78 0 9 S 17 19 E
400.00 400.00 346.78 0 13 S 13 28 W
500.00 500.00 446.78 0 19 S 29 34 W
600.00 600.00 546.78 0 29 S 31 20 W
700.00 699.99 646.77 0,32 S 35 32 W
800.00 799.99 746.77 0 37 S 36 45 W
900.00 899.98 846.76 0 41 S 31 4 W
1000.00 999.97 946.75
1100.00 1099.97 1.046,75
1200.00 1199.96 1146.74
1300.00 1299.96 1246.74
1400.00 1399.95 1346.73
1500.00 1499.95 1446.73
1600.00 1599.95 1546.73
1700~00 1699.94 1646.72.
1800.00 1799.94 1746.72
1900.00 1899.86 1~346.64
0 29 S 31 53 W
0 27 S 19 50 W
037 S 553;4
040 S 0 12 E
034 S 0 41E
027 S 6 6 W
0 15 S 24 35 W
0 16 S 25 24 W
0 54 S 4 5~ W
4 10 S 32 34 5
2000.00 1999.21 1945.99 8 26
2100.00 2097.82 2044.50 10 7
2200.00 2195.79 2142.57 13 5
2300.00 2292.50 223 9.28 16 4
2400.00 2387.86 2334.64 19 6
2500.00 2481.29 2428.07 22 39
2600.00 2572.37 2519.15 26 7
2700.00 2660.85 2607.63 28 49
2800.00 2747.77 2694.55 31 33
2900.00 2830.63 2777.41 35 21
S 42 22 E
S 17 34 E
S 2 53 W
S 0 49 W
S 6 6 E
$ 7 11 E
S 7 9 E
S 6 33 E
S 2 47 E
S 1 13 W
VERTICAL OOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET QEG/IO0 FEET FEET FEET DEG MIN
3000.00 2911.82 2858.60 36 8
3100.00 2992.00 2939.78 37 31
3200.00 3070.54 3017.32 38 33
3300.00 3148.26 3095.04 39 39
3400.00 3224.38 3171.16 41 12
3500.00 3298.00 3244.78 44 24
3600.00 3367.99 3314.77 46
3700.00 3436.72 3383.50 47 57
3800.00 3502.21 3448.99 49 39
3900.00 3566.81 3513.59 49 46
0.00 0.00 0.00 N 0.00 E
-0.15 0.26 0.15 N 0.01 W
-0.17 0.27 0.18 N 0.16 E
0.00 0.34 0.01 N 0.15 E
0.32 0.39 0.31 S 0.10 E
0.79 0.14 0.80 S 0.02 W
1.37 0.05 1.39 S 0.36 W
2.10 0.24 2.16 S 0.86 W
2.82 0.56 2.91 S 1.47 W
3.82 0.38 3.96 S 2.14 W
4.62 0.03 4.79 S 2.69 W
5.33 0.30 5.53 S 3.07 W
6.29 0.13 6.50 S 3.25 W
7.43 0.06 7.65 S 3.30 W
8.57 0.38 8.79 S 3.26 W
9.50 0.49 9.71 S 3.29 W
10.07 0.26 10.30 S 3.42 W
10.46 0.01 10.70 S 3.62 W
11.27 1.64 11.52 S 3.85 W
14.77 5.49 14.95 S 2.57 W
23.75 4.13 23.52 S
37.56 9.66 36.76 S
57.44 3.48 56.61 S
82.63 4.18 31.93 S
112.67 3.63 111.92 S
148.20 3.51 147.25 S
189.36 3.71 188.17 S
235.84 1.26 234.40 S
285.24 7.28 283.62 S
341.10 2.32 339.55 S
S 3 3 W 399.13
S 0 46 W 458.56
S 2 1 Z E 520.41
S 5 9 E 583.32
S 6 33 E 648.10
S 7 0 E 715.63
S 7 4 7 5 786.89
S 8 1 E 859.30
S 8 15 E 934.61
0.00 N 0 0 E
0.15 N 3 38 W
0.24 N 41 14 E
0.15 N 87 56
0.33 S 18 25 E
0.80 S 1 30 W
1.44 S 14 31
2.33 S 21 49 W
3.26 S 26 48 W
4.50 S 28 22 W
S 8 36 E 1010.67
5.49 S 29 17 W
6.32 S 29 I W
7.27 S 26 33 W
8.33 S 23 18 W
9.37 S 20 21 W
10.25 S 18 /+I W
10.86 S 18 22 W
11.30 S 18 41 W
12.15 S 18 29 W
15.17 S 9 45 W
4.50 E 23.95 S 10 50 E
14.31 E 39.44 S 21 16 E
15.30 E 58.64 S 15 7 E
13.82 E 83.09 S 9 34 E
15.75 E 113.02 S :3 0 E
20.01 E 148.60 S 7 44 E
25.19 E 189.85 S 7 37 E .)
30.82 E 236.41 S 7 29 E
35.26 E 285.80 S 7 5 E
35.76 E 341.42 S 5 0 E
1.25 397.86 S
4.91 457.55 S
1.38 519.43 S
1.97 582.22 S
1.84 646.70 S
3.98 713.87 S
0.58 784.70 S
3.64 856.62 S
1.13 931.42 S
0.30 1006.93 S
33.08 E 399.23 S 4 45 E
30.49 E 458.56 S 3 ~8 E
31.90 E 520.41 S 3 30 E
35.84 E 583.32 S 3 31 E
42.65 E 648.11 S 3 46 E
50.79 E 715.67 S 4 4 E
59.91 E 786.98 S 4 21 E
70.00 E 859.48 S 4 40 E
80.73 E 934.91 S 4 57 E
91.91 E 1011.12 S 5 12 E
STANDARD ALASKA PROOUCTION CO.
K-14
PRUDHOE BAY
NORTH SLOPE,ALASKA
COMPUTATION DAT:_: 3-NOV-87
PAGE 2
OATE OF SURVEY: 30-0CT'87
KELLY BUSHING ELEVATION: 53.22 FT
ENGINEER: Jo RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED D~P'TH
TRUE SU,~-SE ~ COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH OEPTH DEG MIN DEG
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SDUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG
4000.00 3631.33 3578.11 49 47
4100.00 3696.02 3642.80 49 36
4200,00 3760.97 3707.75 49 33
4300,00 3825.74 3772.52 49 42
4400.00 3890.58 3837.36 49 13
4500.00 3956.66 3903.44 47 51
4600.00 4024.19 3970.97 47 24
4700.00 4091.95 4038.73 47 14
4800.00 4159.87 4106.$5 47 9
4900.00 4227.56 4174.34 47 20
S 9 0 E 1086.74
S 9 20 E 1162.62
S 9 4 E 1238.28
S 9 3 2 1314.11
S 8 25 5 1389.91
S 6 29 E 1464.77
S 5 25 F 1538.46
S 5 3 E 1611.97
S 5 19 E- 1,585.34
S 5 23 E 1758.90
0.37
0.49
0.71
0.37
1.49
2.19
0.40
0.25
0.60
1.15
1092.44 S 103.58 E 1087.38 S 5 27 E
1157.72 S 115.76 E 1163.49 S 5 42 E
1232.77 S 127.96 E 1239.39 S 5 55 E
1308.01 S 139.94 E 1315.47 S 6 6 E
1383.23 S 151.70 E 1391.52 S 6 15 E
1457.62 S 161.54 E 1466.55 S $ 19 E
1531.00 S 168.98 E 1540.30 S 6 17 E ,)
1604.23 S 175.70 E 1613.83 S 6 15 E
1677.34 S 182.28 E 1687.21 S 6 12 E
1750.61 S 189.24 E 1760.81 S 6 10 E
5000.00 4295.94 4242.72 46 38
5100.00 4364.68 4311.46 46 38
5200.00 4433.06 4379.84 46 53
5300.00 4501.30 4448.08 47 1
5400.00 4569.46 4516.24 47 5
5500.00 4637.41 4584.19 47 5
5600.00 4705.80 4652.58 46 48
5700..00 4774.40 4721.18 46 37
5800.00 4843.25 4790.03 46 19
5900.00 4912.32 4859.10 46 15
S 4 27 E 1831.84
S 4 26 E 1904.46
S 4 36 E 1977.,41
S 4 27 E 2050.50
S 4 37 E 2123.66
S 4 37 E 2197.01
S 4 39 E 2269.96
S 4 9 E 2342.71
S 3 4 E 2415.23
S 2 40 E 2487.53
0.50
0.73
0.38
0.40
0.44
0.60
0.21
0.63
0.69
0.35
1823.30 S 195.52 E 1833.75 S 6 7 E
1895.72 S 201.12 E 1906.36 S 6 3 E
1958.46 S 206.88 E 1979.30 S 5 59 E
2041.32 S 212.67 E 2052.37 S 5 56 E
2114.27 S 218.49 E 2125.53 S 5 53 E
2187.39 S 224.43 E 2198.88 S 5 51 E
2260.11 S 230,35 E 2271.82 S 5 49 E
2332.66 S 235.96 E 2344.56 S 5 46 E
2405.03 S 240.59 E 2417.03 S 5 42 E
2477.25 S 244.14 E 2489.25 S 5 37 E
6000.00 4981.34 4928.12 46 31
6100.00 5050.02 4 ~)96. ~0 46 44
6200.00 5118.60 5065.38 46 37
6300.00 5187.10 5133.88 46 51
6400.00 5255.66 5202.44 46 46
6500.00 5333.90 5270.67 47 3
6600.00 5392.15 5338.93 46 52
6700.00 5460.50 5407.28 47 7
6800.00 5527.95 5474.73 48
6900.00 5594.67 5541.45 48 I
S 2 16 E 2559.~39
S I 25 E 2632.54
S 0 18 W 2705.22
S I 11 W 2777.86
S I 41 W 2850.39
S 2 13 W 2923.16
S 3 I W 2995.82
S 3 38 W 3068.29
S 4 1 W 3141.51
S 4 B W 3215.35
0.60
0.85
0.94
0.42
1.03
0.56
0.70
0.85
0.79
0.62
2549.55 S 247.32 E 2561.51 S 5' 32 E
2622.19 S 249.68 E 2634.05 S 5 26 E
2694.95 S 250.48 E 2706.57 S 5 18 E
2767.80 S 249.40 E 2779.01 S 5 8 E
2840.57 S 247.51 E 2851.34 S 4 58 E
2913.63 S 245.00 E 2923.92 S 4 48 E
2986.64 S 241.65 E 2996.40 S 4 37 E
3059.51 S 237.34 E 3068.70 S 4 26 E
3133.17 S 232.36 E 3141.77 S 4 14 E
3207.47 S 227.05 E 3215.50 S 4 2 E
7000.00 5661.52 5508.30 48 11
7100.00 5728.18 5674.96 48 8
7200.00 5796.16 5742.94 45 37
7300.00 5866.59 5813.37 45 13
7400.00 5937.07 5~83.85 45 10
7500.00 6007.47 5954.25 45 23
7600.00 6077.62 6024.40 45 37
7700.00 6147.49 6094.27 45 43
7800.00 6217.12 6163.90 46 3
7900.00 6286.44 6233.22 46 6
S 4 18 W 3289.04
S 4 20 W 3362.37
S 2 13 W 3435.62
S I 1 W 3506.35
S 0 56 W 3577.07
S 0 52 W 3647.88
S 0 3'9 W 3718.95
S 0 29 W 3790.31
S 0 14 W 3861.91
S 0 3 W 3933.85
0.25
0.29
3.53
0.25
0.25
0.75
0.75
0.14
0.39
0.37
3281.63 S 221.58 E 3289.11 S 3 51 E
3355.95 S 215.88 E 3362.89 S 3 40 E
3429.12 S 211.18 E 3435.6Z S 3 31 E
500.08 S 209.54 E 3506.35 S 3 25 E
571.01 S 208.35 E 3577.09 S 3 20 E
3642.02 S 207.20 5 3647.91 S 3 15 E
3713.28 S 206.24 E 3719.01 S 3 10 E
3784.82 S 205.53 E 3790.40 S 3 6 E
3856.59 S 205.02 E 3862.03 S 3 2 E
3928.67 S 204.87 E 3934.'01 S 2 59 E
STANDARD ALASKA PRODUCTION CO.
K-14
PRUDHOE BAY
NORTH SLOPE,ALASKA
COMPUTATION DATE: 3-NOV-87
PAGE
DATE OF SURVEY: 30-0CT-87
KELLY BUSHING ELEVATION: 53.22 FT
ENGINEER: J. RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUS-SE& COURSE VERTICAL 90GLEG RECTANGULAR COORDINATES HORIZ. DEPARTUR6
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERI'TY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN
8000.00 6355.84 6302.62 45 55
8100.00 6425.56 6372.34 45 36
8200.00 6495.79 6442.57 45 10
8300.00 6566.56 6513.34 44 42
8400.00 6637.96 6584.74 44 18
8500.00 6709.30 6656.08 44 55
8600.00 6779.48 6726.26 45 43
8700.00 6849.11 6795.89 45 51
8800.00 6918.77 6865.55 45 55
8900.00 6988.24 6935.02 46 0
9000.00 7057.75 7004.53 46 2
9100.00 7126.97 7073.75 46 14
9200.00 7196.04 7142.82 46 22
9300.00 7265.14 7211.92 46 1
9400.00 7334.77 7281.54 45 42
9500.00 7404.65 7351.43 45 40
9600.00 7474.42 7421.20 45 47
9700~00 7544.04 7490.82 45 56
9800.00 7613.67 7560.45 45 43
9900.00 7683.63 7630.41 45 26
10000.00 7754.00 7700.78 45 7
10100.00 7824.60 7771.38 45 8
10200.00 7894.75 7841.54 45 44
10300.00 7964.27 7911.04 46 21
10400.00 8033.35 7980.13 46 4
10500.00 8102.68 8049.46 45 47
10600.00 8172.75 8119.53 45 27
10700.00 8243.44 8190.22 44 35
10800.00 8315.15 8261.93 43 53
10900.00 8386.79 8333.57 44 48
11000.00 8457.10 8403.88 45 42
11100.00 8526.63 8473.41 46 17
11200.00 8594.95 8541.73 47 23
11300.00 8662.14 8608.92 48 2
11400.00 8728.88 8675.66 48 15
11500.00 8795.21 8741.99 48 36
11600.00 8861.13 8807.91 48 59
11700.00 8926.36 8873.14 49 44
11800.00 8990.98 8937.76 49 44
DEG MIN FEET OEG/IO0 FEET FEET FEET OEG MIN
S 0 1 E 400 5.71
S 0 3 W 407 7. Z6
S 0 8 W 4148.31
S 0 8 W 4218.81
S 3 45 E 4288.76
S 7 17 E 4358.75
S 7 50 E 4429.'80
S 7 45 E 4501.36
S 7 31 E 4572.92
S 7 22 E 4644.69
S 7 7 E 4716.44
S 6 50 E 4788.47
S 6 32 E 4860.67
S 6 6 E 4932.85
S 5 51 E 5004.58
S 5 39 E 5076.04
S 5 18 E 5147.64
S 4 48 E 5219.41
S 4 3 E 5291.16
S 3 15 E 5362.61
S 2 34 E 5433.65
S I 2 E 5504.45
S 0 45 W 5575.59
S 2 12 W 5647.19
S 2 41 W 5719.10
S 3 B W 5790.70
S 3 53 W 5861.53
S 4 14 W 5931.68
S 4 57 W 6000.67
S 5 17 W 6069.64
S 5 11 W 6139.92
S 4 42 W 6210.99
S 3 59 W 6283.34
S 3 43 W 6356.79
S 3 24 W 6430.69
S 3 16 W 6504.99
S 3 22 W 6579.66
S 3 59 W 6654.~9
S 4 0 W 6730.55
0.45
0.66
0.50
1.06
3.61
1.45
0.51
0
0.28
0.25
0.37
0.38
0.49
0.44
0.36
0.34
0.33
0.49
0.72
0.64
0.71
1.37
2.05
0.63
6.07
3.13
1.57
1.06
0.61
1.34
0.50
1.17
0.79
0.63
0.58
0.29
0.69
5.80
0.00
4000.67 S 204.88 E 4005.91 S 2 55 E
4072.35 $ 204.87 E 4077.50 S 2 52 E
4143.54 S 204.75 E 4148.60 S 2 49 E
4214.19 S 204.41 E 4219.15 S 2 46 E
4284.17 S 206.13 E 4289.12 S 2 45 E
4353.84 S 213.45 E 4359.07 S 2 48 E ~
4424.45 S 222.90 E 4430.06 S 2 53 [
4495.54 S 232.71 E 4501.56 S 2 57 E
4566.65 S 242.21 E 4573.07 S 3 2 E
4637.98 S 251.56 E 4644.80 S 3 6 E
4709.32 S 260.61 E 4716.52 S 3 I0 E
4780.94 S 269.44 E 4788.52 S 3 13 E
4852.76 S 277.84 E 4860.70 S 3 16 E
4924.59 S 285.81 E 4932.88 S 3 19 E
4995.99 S 293.29 E 5004.59 S 3 21 E
5067.15 S 300.49 E 5076.05 S 3 23 E
5138.46 S 307.34 E 5147.65 S 3 25 E
5209.98 S 313.69 E 5219.41 S 3 26 E
5281.52 S 319.26 E 5'291.16 S 3 27 E
5352.83 S 323.80 E 5362.61 S 3 27 E
5423.78 S 327.46 E 5433.66 S 3 27 E
5494.56 S 329.83 E 5504.45 S 3 26 E
5565.82 S 330.03 E 5575.60 S 3 23 E
5637.69 S 327.92 E 5647.22 S 3 19 E
5709.93 S 324.82 E 5719.16 S 3 15 E
5781.88 S 321.16 E 5790.79 S 3 lO E
5853.10 S 316.95 E 5861.67 S 3 5 E
5923.67 S 312.13 E 5931.89 S 3 0 E
5993.14 S 306.55 E 6000.97 S 2 55 E
6062.62 S 300.23 E 6070.05 S 2 50 E
6133.43 S 293.71 E 6140.46 S 2 44 E
6205.02 S 287.45 E 6211.67 S 2 39 f
6277.84 S 281.95 E 6284.17 S 2 34 E
6351.73 S 276.96 E 6357.76 S 2 29 E
6426.05 S 272.33 E 6431.82 S 2 25 E
6500.76 S 267.98 E 6506.28 S 2 21 E
6575.83 S 263.64 E 6581.12 S 2 17 E
6651.49 S 258.91 E 6656.53 S 2 13 E
6727.62 S 253.59 E 6732.40 S 2 9 E
COMPUTATION DATE: 3-NOV-87
PAGE 4.
STANDARD ALASKA PRODUCTION CO.
K-14
PRUDHOE BAY
NORTH SLOPE,ALASKA
DATE OF SURVEY: 30-OCT-8?
KELLY BUSHING ELEVATION: 53.22 FT
ENGINEER: J. R~THERT
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASUREO OEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
0.00 0.00 -53.22 0 0
1000.00 999.97 946.75 0 29
2000.00 1999.21 1945.99 8 26
3000.00 2911.82 2858.60 36 8
4000.00 3631.33 3578.11 49 47
5000.00 4295.94 4242.72 46 38
6000'00 49,~1.34 4928.12 46 31
7000.00 5661.52 5608.30 48 '11
8000.00 6355.84 6302.62 45 55
9000.00 7057.75 7004.53 46 2
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIHUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
10000.00 7754.00 7700.78 45 7
11000.00 8457.10 8403.88 45 42
11800.00 8990.98 8937.76 49 44
N 0 0 ~ 0.00
S 31 53 W 4.62
S 42 22 E 23.75
S 3 3 W 399.13
S 9 '0 E 1086.74
S 4 27 E 1831.84
S 2 16 E 2559.B9
S 4 18 W 3289.04
S 0 1 E 4005.71
S 7 7 E 4716.44
S 2 34 E 5433.65
S 5 11 W 6139.92
S 4 0 W 6730.55
0.00
0.03
4.18
1.25
0.37
0.50
0.60
0.25
0.45
0.37
0.00 N 0.00 E 0.00 N 0 0 E
4.79 S 2.69 W 5.49 S 29 17 W
23.5;? S 4.50 E 23.95 S 10 50 E
397.86 S 33.08 E 399.23 S 4 45 E
1082.44 S 103.58 E 1087.38 S 5 27 E
1823.30 S 195.5Z E 1833.75 S 6 7 E
2549.55 S 247.32 E 2561.51 S 5. 32 E
3281.63 S 221.58 E 3289.11 S 3 51 E
4000.67 S 204.88 E 4005.91 $ 2 55 E
4709.32 S 260.61 E 4716.52 S 3 :LO E'
0.71
0.50
0.00
5423.78 $ 327.46 E 5433.66 S 3 27 E
6133.43 S 293.71 E 6140.46 S 2 44 E
6727.62 S 253.59 E 6732.40 S 2 9 E
CDMPUTATIgN DATE: 3-NOV-B7 PAGE 5
STANDARD ALASKA PRODUCTION CO.
K-14
PRUOHOE BAY
NORTH SLOPEtALASKA
DATE OF SURVEY: 30-0CT-87
KELLY BUSHING ELEVATION: 53.22 FT
ENGINEER: J. RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
OEPTH DEPTH DEPTH DEG MIN DEG MIN
0.00 0.00 -53.22 0 0 N 0 0 E
53.22 53.22 0.00 0 8 N 9 34 W
153.22 153.22 100.00 0 7 N 87 28 E
253.22 253.22 200.00 0 5 S 21 3 W
353.22 353.22 300.00 0 11 S 16 17 W
453.22 453.22 400.00 0 18 S 14 37 W
553.22 553.22 500.00 0 22 S 27 27 W
653.23 653.22 600.00 0 32 S 33 20 W
753.23 753.22 700.00 0 32 S 40 8 W
853.24 853.22 800.00 0 43 S 31 58 W
953.24 953.22 900.00
1053.25 1053.22 1000.00
1153.25 1153.22 1100.00
1253.26 1253.22 1200.00
1353.27 1353.22 1300.00
1453.27 1453.22 1400.00
1553.27 1553.22 1500.00
1653..28 1653.22 1600.00
1753.28 1753.22 1700.00
1853.29 1853.22 1800.00
0 33 S 34 31 W
0 28 S 25 22 W
0 35 S 10 11 W
039 S 1 51W
039 S 2 13 E
0 32 S 0 43 W
0 20 S 13 10 W
0 16 S 27 32 W
0 28 S 17 37 W
2 I S 17 18 E
1953.61 1953.22 1900.00 6 32
2054.72 2053.22 2000.00 9 48
2156.41 2153.22 2100.00 11 41
2259.22 2253.22 2200.00 15 1
2363.47 2353.22 2300.00 17
2469.69 2453.22 2400.00 21 32
2578.74 2553.22 2500.00 25 21
2691.29 2653.22 2600.00 28 43
2806.45 2753.22 2700.00 31 56
2927.73 2853.22 2300.00 35 33
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FSET DEG/IO0 FEET FEET FEET OEG MIN
3051.44 2953.22 2900.00 36 32
3177.88 3053.22 3000.00 38 27
3306.45 3153.22 3100.00 39 45
3438.55 3253.22 3200.00 42 7
357B.73 3353.22 3300.00 45 57
3724.84 3453.22 3400.00 48 44
3878.95 3553.22 3500.00 49 46
4033.90 3653.22 3600.00 49 43
4188.07 3753.22 3700.00 49 30
4342.49 3853.22 3800.00 49 40
0.00 0.00 0.00 N 0.00 E
-0.04 0.14 0.04 N 0.01 W
-0.22 0.29 0.23 N O.OB E
-0.08 0.14 0.09 N 0.15 E
0.18 0.27 0.17 S 0.16 E
0.58 0.24 0.57 S 0.07 E
1.05 0.37 1.07 S 0.17 W
1.75 0.14 1.80 S 0.61 W
2.48 0.16 2.56 S 1.17 W
3..34 0.05 3.46 S 1.83 W
4.]28 0.38 4.43 S 2.46 W
5.00 0.17 5.19 S 2.92 W
5.80 0.11 6.00 S 3.18 W
6.89 0.07 7.11 S 3.29 W
8.05 0.06 8.27 S 3.29 W
9.07 0.05 9.29 S 3.27 W
9.84 0.09 10.06 S 3.35 W
10.26 0.68 10.49 S 3.53 W
10.75 0.63 11.00 S 3.74 W
12.54 3.25 12.79 S 3.65 .W
S 39 53 m 18.99
S 40 I ~ 30.63
S 0 3~ E 48.12
S 3 35 W 71.75
S 4 44 E 101.10
S 7 3 5 136.79
S 7 11 : 1BO. 16
S 6 40 ~ 231.65
S 2 26 E 288.69
S 2 14 W 357.12
0.00 N 0 0 E
0.04 N 9 7 N
0.24 N 18 32 E
0.17 N 58 30 E
0.23 S 43 ~+4 E'
0.58 S 7 25 E >~
1.08 S 9 18 W
1.90 S 18 53 W
2.81 S 24 38 W
3.91 S 27 55 W
S 2 39 W 429.48
S 1 53 5 506.65
S 5 18 E 587.45
S 6 54 E 673.65
S 7 36 E 771.62
S 8 3 E 877.81
S 8 31 E 994.65
S 9 9 : 1112.51
S 9 5 E 1229.25
S 8 57 E 1346.36
5.07 S 29 2 W
5.95 S 29 20 W
6.79 S 27 53 W
7.83 S 24 50 W
B.90 S 21 40 W
9.85 S 19 22 W
10.60 S 18 23 W
11.07 S 1.8 36 W
11.61 S 18 46 W
13.30 S 15 56 W
3.84 19.00 S
3.30 30.05 S
4.39 47.26 S
2.93 71.01 S
3.59 100.39 S
3.85 135.91 S
3.49 179.02 S
1.33 230.23 S
6.87 287.07 S
2.17 355.63 S
0.51 E 19.00 S 1 31 E
10.43 E 31.81 S 19 8 E
15.54 E 49.75 S 18 11 E
14.35 E 72.45 S 11 25 E
14.61 E 101.45 S 8 16 E
18.59 E 137.18 S 7 47 E
24.04 E 180.63 S 7 38 E ;
30.34 E 232.22 S 7 30 E
35.38 E 289.24 S 7 1 E
35.27 E 357.3B S 5 39 E
1.18
0.74
1.92
3.09
0.89
2.73
0.53
0.66
0.67
0.67
428.35 S 31.54 E 429.51 S 4 12 E
505.67 S 31.43 E 506.65 S 3 33 E
586.33 S 36.23 E 587.45 S 3 32 E
672.11 S 45.64 E 673.66 S 3 53 E
769.53 S 57.86 E 771.70 S 4 17 E
875.01 S 72.59 E 878.02 S 4 44 E
991.03 S 89.50 E 995.07 S 5 9 E
1108.00 S 107.66 E 1113.22 S 5 32 E
1223.80 S 126.53 E 1230.33 S 5 54 E
1340.01 S 145.03 E 1347.83 S 6 10 E
STANDARD ALASKA PRODUCT[ON CO.
K-14
PRUDHOE BAY
NORTH SLOPEsALASKA
COMPUTATIDN DATE: 3-NOV- 87
PAGE 6
DATE OF SURVEY: 30-0CT-87
KELLY BUSHING ELEVATION:' 53.22 FT
ENGINEER: J. RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMU'TH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
4494.86 3953.22 3900.00 47 56
4642.89 4053.22 4000.00 47 22
4790.24 4153.22 4100.00 47 8
4937.69 4253.22 4200.00 46 54
5083.33 4353.22 4300.00 46 34
5229.48 4453.22 4400.00 46 54
5376.18 4553.22 4500.00 47 2
5523.19 4653.22 4600.00 46 56
5669.19 4753.22 4700.00 46 35
5814.44 4853.22 4800.00 46 21
5959.18 4953.22 4900.00 46 21
6104.68 5053.22 5000.00 46 44
6250.47 5153.22 5100.00 46 46
6396.45 5253.22 5200.00 46 45
6543.03 5353.22 5300.00 46 58
6689°32 5453.22 5400.00 47 2
6837.88 5553.22 5500.00 48 10
6987.55 5653.22 5600.00 48 10
7137.50 5753.22 5700.00 47 40
7281.03 5853.22 5800.00 45 14
7422.91 5953.22 5900.00 45 11
7565.13 6053.22 6000.00 45 28
7708.20 6153.22 6100.00 45 43
7852.04 6253.22 6200.00 46 8
7996.24 6353.22 6300.00 45 56
8139.46 6453.23 6400.00 45 26
8281.21 6553.22 6500.00 44 48
8421.33 6653.22 6600.00 44 20
8562.44 6753.22 6700.00 45 ~Z
8705.90 6853.22 6:300. O0 45 51
8849.56 6953.22 6900.00 46 0
8993.48 7053.22 7000.00 46 1
9137.97 7153.22 7100.00 46 18
9282.85 7253.22 7200.00 46 5
9426.41 7353.22 7300.00 45 39
9569.59 7453.22 7400.00 45 47
9713.21 7553.22 7500.00 45 55
9856.58 7653.22 7600.00 45 36
9998.89 7753.22 7700.00 45 7
10140.59 7853.22 7800.00 45 18
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
S 6 35 E 1460.96
S 5 16 E 1570.02
S 5 lB E 1678.20
S 5 4 E 1786.50
S 4 26 E 1892.36
S 4 36 E 1'998.91
S 4 37 E 2106.24
S 4 38 E 2213.98
S 4 17 E 2320.35
S 2 56 E 2425.68
2.28
0.23
0.49
1,39
0,64
0.50
0.14
0.77
0.69
0.66
1453.83 S 161.09 E 1462.73 S 6 19 E
1562.44 S 171.91 E 1571.87 S 6 16 E
1670.22 S 181.61 E 1680..07 S & 12 E
1778.11 S 191.79 E 1788.42 S 6 9 E
1883.65 S 200.18 E 1894.26 S 6 3 E
1989.89 S 208.61 E 2000.80 S 5 59 E ~
2096.89 S 217.07 E 2108.10 S 5 54 E
2204.30 S 225.80 E 2215.84 S 5 50 E
2310.35 S 234.31 E 2322.20 S 5 47 E
2415.46 S 241.15 E 2427.47 S 5 42 E
S 2 30 E 2530.30
S 1 22 E 2635.95
S 0 53 W 2741.85
S 1 40 W 2847.81
S 2 34 W 2954.48
S 3 35 W 3060.54
S 4 4 W 3169.48
S 4 17 W 3279.84
S 4 3 W 3390.53
S 1 5 W 3492.93
0.64
0.93
0.68
0.96
0.54
0.87
0.24
2.80
0.52
2519.98 S 246.09 E 2531.97 S 5 34 E
2625.60 S 249.77 E 2637.45 S ~c 26 E
2731.68 S 250.06 E 2743.10 S 5 13 E
2837.99 S 247.58 E 2848.77 S 4 59 E
2945.10 S 243.65 E 2955.16 S 4 43 E
3051.71 S 237.84 E 3060.96 S 4 27 E
3161.32 S 230.36 E 3169.70 S 4 10 E
3272.38 S 222.27 E 3279.92 S 3 53 E
3383.79 S 213.78 E 3390.54 S 3 36 E
3486.62 S 209.77 E 3492.93 S 3 26 E
S 0 56 W 3593.27
S 0 43 W 3694.11
S 0 29 W 3796.16
S 0 7 W 3899.33
S 0 I E 4003.02
S 0 5 W 4105.35
S 0 18 W 4205.61
S 4 51 E 4303.65
S 7 42 E 4403.03
S 7 43 E 4505.58
0.27
0.70
0.15
0.28
0.50
0.35
0.61
3.67
0.61
0.27
3587.26 S 208.09 E 3593.29 S 3 19 E
3688.38 S 206.54 E 3694.16 S 3 12 E
3790.69 S 205.48 E 3796.25 S 3 6 E
3894.08 S 204.92 E 3899.47 S 3 0 5
3997.97 S 204.88 E 4003.21 S Z 56 E
4100.50 S 204.83 E 4105.61 S 2 51 E
4200.96 S 204.48 E 4205.93 S 2 47 E
4299.02 S 207.22 E 4304.01 S Z 45 E
4397.84 S 219.26 E 4403.31 S 2 51 E
4499.73 S 233.28 E 4505.78 S 2 58 E
S 7 28 E 4608.47
S 7 7 E 4711.76
S 6 41 E 4815.85
S 6 9 E 4920.54
S 5 48 E 5023.46
S 5 25 E 5125.86
S 4 43 5 5228.90
S 3 35 E 5331.63
S 2 35 5 5432.87
S 0 17 E 5533.20
0.18
0.34
0.34
0.79
0.38
0
0.61
0.67
0.71
1.45
4601.98 S 246.86 E 4608.60 S 3 4 E
4704.66 S 260.03 E 4711.84 S 3 9 E
4808.18 S 272.66 E 4815.90 S 3 14 E
4912.33 S 284.50 E 4920.56 S 3 18 E
5014.79 S 295.21 E 5023.47 S 3 22 E
5116.76 S 305.30 E 5125.86 S 3 24 E
5219.44 S 314.49 E 5228.90 S 3 26 E
5321.90 S 321.96 E 5331.63 S 3 27 E
5422.99 S 327.42 E 5432.87 S 3 27 E
5523.35 S 330.18 E 5533.21 S 3 25 E
STANDARD ALASKA PRODUCTION C0.
K-14
PRUDHOE BAY
NORTH SLOPE,ALASK~
COMPUTATION O~TE: 3-NOV-87
PAGE 7
DATE OF SURVEY: 30-OCT-87
KELLY BUSHING ELEVATION: 53.22 FI'
ENGINEER: J. RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUS-SEA DEPTH
TRUE SUB-SE~ COURSE VERTICAL 00GLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DISTo AZIMUTH
DEPTH DEPTH DEPTH DEG M'[N
10284.01 7953.2.2 7900.00 46 15
10428.65 8053.22 8000.00 46 0
10572.12 8153.212 '8100.00 45 41
10713.74 8253.22 8200.00 44 28
10852°93 8353.22 8300.00 44 13
10994.44 8453.22 8400.00 45 41
11138.63 8553.22 8500.00 46 46
11286.67 8653.22 8600.00 47 59
11436.63 8753.22 8700.00 48 23
11587.95 8853.22 8~00.00 48 55
11741.57 8953.22 8900.90 49 44
11800.00 8990.98 8937.76 49 44
CEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN
S 2 5 W 5635.68
S 2 48 W 5739.50
S 3 27 W 5341.80
S 4 20 W 5941.24
S 5 13 W 603'7.03
S 5 12 W 6135.99
S 4 24 W 6238.74
S 3 45 W 6346.96
S 3 22 W 6457.86
S 3 20 W 6570.65
S 4 0 W 6686.34
S 4 0 W 6730.55
O.B4
1.1Z
1.05
I .08
0.97
0.51
1.53
0.67
0.32
0.62
0.00
0.00
5626.13 S 328.35 E 5635.70 S 3 20 E
5730.52 S 323.81 E 5739.67 S 3 14 E
5833.25 5 318.27 E 5841.93 S 3 7 E
5933.29 S 311.40 E 5941.46 S 3 0 E
6029.76 S 303.27 E 6037.38 S 2 52 E
6129.47 S 294.07 E 6136.5'2 S 2 44 E
6232.95' S 235.22 E 6239.47 S 2 37 E
6341.84 S 277.6L E 6347.91 S 2 30 E
6453.37 S 2'70.72 E 6459.05 S 2 24 E
6566.77 S 264.17 E 6572.08 S 2 18 E
6683.14 S 256.70 E 6688.06 S 2 11 E
67?.7.62 S 253.59 E 6732.40 S 2 9 E
SCHLUMBEROER
O I RECT I ONAL SURVEY
COMPANY
STANDARD ALASKA PRODUCTION
WELL K- 1 4
FIELD PRUOHOE BAY
COUNTRY USA
RUN 1
DATE LOOOED SO - OCT - 87
REFERENCE ?2482
WELL' K- 14 ~
(1909' SNL, 1174' EWL, ,C 4, TllN, R14E)
-,~,,HORIZONTAL PROJECTION
N0eTH 6000
REF 72482
SCALE : 1/2000 IN/FT
4000
2000
-2001
-4000
-6000
· -8000
i~i[ ~i! fi~ ~::: ::: :::~i~;;: ~ "~'"~'".-'~'"1'"~*"?'"~'-~ ...... ~'"?'"~"'~'"T"'~"'~'"~'"~ ....... ~'"~'"?'"~'",'"~'"?'"?'"? ....... ?'-?'"?'"?'"~"'?'"~'-4'"4 ....
"T"?T"?"t'T'~'"~"'T'?"~'"i"i'"?'-'i'--! ....... f'ff-i-'-r"~-'-t-i"-fi ...... +"?'f'ff'"~'"f"f'ff"'t""'t'+'ff"-f'+'-f'i--'f'i ...... i-'-fff'--t-T"t'-i'-'f-+ ....... ~..+.+..?t..+.-~-.+..~ ....... ~..+.+.+..t...~..+..~...~ ....
"'?'"?"'~'"? ...... ??"'?"'?"?"+"~ ...... ~'"i'"+'"~ ...... ~'{'"+'"i'"I'"+'"+"-~'"~ ....... ~'"+'"i'"~ ..... i---+.-.+.--~.--i-.-~...l...~...~...L..~..-~...~...~ ...... ~.--~,.-;.--~...'...~....~...~...4-.~...4...4...;...;...i...4...;-.4-4
~-'-~-'!---~-'-!--!"'i-'-~-'""'~-'-i--~--'i'-'t--'!---i---~-'-i ....... H'-t-i-v-~,i--'!-i ....... i-'-~'-'~-'-!---!"-~---~-'-~---~ .......
.-i...i...L.i ...... L.~..L,...i...LL.i...i!ii.i .....
.i..L.i..i .i. LI~ i L~ ~ I: ~ ~ ~
::;~ ::=,~-?'--~----?---?--~'"~ ...... ?...?-?-..t...I..?~...~.,.? ...... ~...?...~...?...-.?...?...?? ...... ?..?...?...?...~...?~...?..? ....... .......... ~...,..~..., ..... ,...~...,..., ....... ~...~...~..., ....... ~...~..,...~...
,-+-.-+-.-~--+ ....... +...~-.-~--,,-.i.--~4-.-;---i---~---i.--i--4 ....... ~-..~.--~--4--.*---~..4..,;.-4 ...... i---i--.~..4---l-.-~-.-~---~,.-; ....... ;..4...~.-.~ ....... ~...~...;-..; ....... ;..4-.;.-~.-.i.--[-.i..-i....i ...... l...i...i...i.-l...~...i...~...~ .......
· -~..+-+.-+ ..... ~---~--+.- -+-.+-!.4--!-i--.!-.-i--.~ ....... i--~.--~-.4-..i-.-~-.--i.--~--.~ ...... ~-4--.~4-.-i..-~...~-i...~-.---4---~..-i--.~--.I--.~.--;--~.-.i ....... ~-..~..-~..-~-.-I...~.4--.4 ..........
r.~...~..T..~..T.T..~...i...i.~...~...t.~...i.~.t.~f.~...f.i...f.~...f~.f..f..t..f..f..~ ....... f--f--f--f-T-ff"-f.ff-'ff ...... i.-ff..ff-ff--.!--.f-.i-.-f..-~ ...... f-'f--f-'f--?.'.i...f..f.i ....... t.-t.'f'.i ....... t..f.+-i ...... t.ff...i...i ...... i...?+..f--
, , ~ : ~ ................ t ........ ~ ........ ~ ........ t-.?..? ? ~ .? ? ? ~...-..?..?..?? ...... ?.?-I...?..?-,.--
--~...~.-.+.-.~ ..... ~.-.~---~.-..-~--~---~..-~.-.+--.~--.~---~---.~ ...... ~--~-~--~-.~i.~-
' i .... , t ~t*'~'? ..... ~"~"~'"~ ....... ?~'"~'"~ ...... ~'"????.-?..??.~.-.
,,, ~I"'~'"~'"~'" ?~'"? ...... ?'?'?"~'"d'"?'?"?'? ....... r'?'~-i-'~--~--?'-? ....... ~'"?'?i'-~-'~--.'~ ...... ~'--'~"-~'--i--'~--.'.'~ ...... ~--~".-~-""~'--.-.~ ...... ~..-~...,-..,...1...,..-,.-~--.~...
...?...T..?...?...?.~?...?...?.....?...?...?...?...~...T..?...?..?`...?...?...?...?...??...?..??~...?."?...?...?.~t..~-?...?~.?...?..?~.r..i...~...{.~.+..~...~ ....... {'"!'"{'"{"-."'i"-i'-~--{ ....... ~...i...~.-~ ....... i...~-..~...~ ....... ~.,.~...~...~.,.{...~...~.-~...~
~.t..t~?.~-t..t..t.+...+.+.+.+..f.+.+..{...~...;...~...~...i...+...~...~".~...{...{...i..+.+.+.+.+..~...i..`~...i .......
· "?.'?'M'"?t'i'"'i"i"-i'":-ti"i-'!'"i ....... H"i"i"!"i"i"i-i"'~"i"i"i"i"i"i"i"i"i ....... H'-?'i"i'-i"i"i""i ....... t'i"i'-'H'-'H'--':'-'i ....... H'"H ...... H-'H ...... H'"H ....... H"H
"T-?-?T"fTTT'TT"?"T'T'T'TT'~ ....... T'T"?'T'TTT'T"? ...... ~-'t'TT'!"';'"r'~'"?"i'"~-v'r'~ ....... ~'"r'r'r':"'t"f"f'ff ....... f"f"t"! ....... f't"f"i ...... f"f"t"i ..... f'ff-ff'"?'"f"t"fff
· --~...?--~.--~ ...... ~..-~--.~-.-..~-.~-.-v-,.~ ...... ~--.~---~--.~ ....... ~-.-~---~.--~---+---~--.,-..~..., ...... ~.--4.--~--., ...... ~---4.,.~.-.4 .... '-.~.--4..-4-444~,4...4...4...~ ....... ~...~...1...4 ....... ~.-~...{..-~,-.-4..-~.-.'...4 ...... ',..'...'...' .... '..'''
· ..L4...L-L.[..L.i..i.....;..i..i..L.I..LiiJ ;i.L.i 1i iii ~ilall ~ ~ ~[Xi ~ ~ i ~ i i : i i i i i i i ! i i , i i i I i IT i I "~'l'"l'"? ....
· "?'v?"'?T'~"?"?"?"??r"t"?'??'"? ...... ?"?"??'T"??"?'~ ...... ?"?"?"~"T"???"? .... ?"?-~'"? ...... ~'"~-"~'"'~ ...... ?"??~ .......... ~'"? ............... ~ .............. i.--* ....... + ..... ~.-*..-~...* ...... {..+..~...+ ....
.-!-.i.-.i--Lt---i--i-..i.-.,..i--.i-.i-..!.-!-..i.-.i-.-!...~ ....... i---i--.i--.i---i.-.i---i---i.--~--q-.-i.--i-.!---t--i--.~---i---i.~q...i.-14 ....... ;..i-.i4 ..... i...i4-.~...,...¢...~...~...¢...~4-.i4...~..444-.i ...... ~...i4...i ...... i...i...i4 ....
'"i?"!'"t"~"+-t"t"'"f"t'+'+"f'+'+"i-"i ....... !---%.i---i---~.--!.--i--.!--.i ....... i.-+-+-+--l.-+-.{-+-.i ..... i...i.-!...~---..-.~--.{--.+..+ ...... ~.-.~.-.{-.~..+..~...{...i...{...;...i.,-i..-i---{ ....... i.-.~..-~.--~ ....... ~...~...i.-+.-i...~...¢.-.~...~ ....
--+--!.-+-i ...... ~.-+-.~---,--!---i---~---~--i---i..-+.--{..-~ ....... {---{---~---i---?{---i---i---i ....... +.-.~-..{...{ ...... ;...;...a4 ..... ~...i...~.4...'...~...;...~...~ ...... ;...;-¢...i...I...4...;..4...; ...... i~.~-.~.-i ....... ~...i..4..4 ....... ~..4...;..4 ....... i...L.i...i ....
--i-+.-i-~---I-.;..~-.-~....--~...~-..;---~-.+-.¢-.-;--.~..-~ ....... ;..4...i..4.-.1-4...i..4...i ....... ~...;...~...~...[;...;..;.i .....
.4..14.-;..i444.--..44444-..i...i...4.4 .......
::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::
]"*'"*'"*'"~"t'''~''~'''*'''' -'~'''*'''* -'~'''~'''*-"'''~'- *iii ] ~ i i i ~ i i , i i i ~ ....... +'"~"'~'"~'"~'"~'"~ "'4'"$ ] i ~ J i ~ i ! ! ....... ~---~-.-%.--%.-.$-..4-.-~---~! i i i i i ! i i ........ ii im~ ] j i j4'"$'"4'"% ...... $...%.-.%-..% ....... ~...~i ! i i t i i i i '~ '~ .... ~ % ~ 4 ~: : : : 4 % 4 %1 ~ ~ i4 4 4 4~ i ~ {% 4 4 ~: T ~ ~' 4 '
.~...1...~...~...1...~...~...~...~..~...~.~...~...1...~...~...~...~...:...~...~...~...~...~...~...~...~.~ ....... L~.4...Lt...L.LLL,~...~...LL.L~ ...... ~...~...~...~...I...~...~...~...~ ....... ('i--'i'"i
.... ~..~...~...~...~..~...~...~...~..~...~...~...~...~...~...~...~...~...~...~...~...~...~...~...~...~...~...~ ....... ~-.-~.--~---~--~--~-..~---~.-.~...,~ i~.~...;...~...~-.~.-~ ...... ~-..~...~..-~-.i..-L;..:--~ ....... ~..~..-..~..,...LL:..~._
...... .......
.... 4...~...¢...I...¢...¢...¢...~ ....... ~...~...~...~..-....¢...~...~...~ ...... ~..~...~...¢......?..~...~...~ ....... ~-.~...~...~ ....... ~...~...~...¢...
-!-ff'i?'H-?t" "~-H'+'H'"H'"i'"H'"~'+'r'H'"i-+'~'''H'''HTH'''H'-''~'~ '-;'~--~--4-'* ...... ~'--"-~"'~-+-'~--'~-"-"~ ....... ~--'~-";-~-".+-.~--~--* ..... ;.-~--.~..-~ ....... ~...~---".~
· ":-T"r': ...... r'r':"-"r'-r'r-r',-":--'r-~--'~ ....... r--r-r-r-~-"r--r-r-r-~..-r.-r-r.'r-?--f.-t.-f-...:.~4-.-~.-'~-4-4-4-4 ....... L.L.~.4..4.4.4.4.4 ...... L.;.4.4 ....... ~.4.4.4 ....... L4.4...~ ....... L.~.4.4
?'r?[.-?t-? "?-??l---?i--i-'-? ....... ?'??"?tt'i'''~-t-?t'rt-?'?'i''':-~i -i--i--'H-'H-'H ....... i'-!-'H-ti-i-i'-~ ....... i-'i'-H--~"i"i-i-'{ ....... i-'i'"H-'~'"H'-H
...~...~.-~...~...l...~...;...;..-..~...,...~...g..+..~...;...~...~ ....... ~...~...~.-~..-L.~.-.~.-4.-4 ...... ~..4.4..4...~...~...~..4...~...i.1~
~"~"? .~"'~'-~'"t'~"'~'"~'"~"+"?+'+'+"~ ....... ~'"?~'+'i"'?'+"H ...... ~'"~"++"i"+'+'~-~ ....
~:~:,::: ::::~:::: ::::~::::
'"t'~-'t"t'i'"t't"t'"t't"t"t"?'"t"t'"~'"~ ....... t"t'f'f'?f'f"f'~ ...... t"f't"f'F~'"f't"f'~"l:-'t"f'~ ....... f.'f-t--f..'.-?.~-.-~.--t-.f--f.?--f..~ ....... ?!'-.t-f-r'f.+..f.~ ..... f'~'"~'"f"'"~'"t"~"-~ ....
· .-?~~-~-.-~ ...... ~.-~-~-- ..~*---~- ~---~--.~--~ ....... .---.---~.--4 ...... ~...~...~-..~ ..... 4...4...~..~ ...... ~...4-~--.~ ......
'"?"?"?"~'"~'"?"?~'""?"?'?"?'*'"?~'"?+ ...... ?~"+'+"*'"~"+'+"+ ...... ~-+"+'+"I"+'+-'+-+ ..... ...~.~+.+.+..~-~'"f'ff'"~-'f'ff"ff"ff ...... ..... +..+.+.+.+.+..~..+..+t'ff"ff"~"i-'t'+"f"~ ....... ....... f"~'"t"+-'!-+-~+"+~..+..?..~ ....... ~...~...~...~ ....... ...... +"+'+"~...~...~...~ ...... ...... +'+"~"?~..4...~...~ ....
I ..... ::: :::: ::~: ~::: : :: ,: , ~ :::: :::::::~: :::: :~:: ~,~
'~"~'"?~ .....t ?"?"?-?"~'"~'"?*"'~'"?'?"? ....... TTT'TTT'TT'? ....... T'TTT'TTTT'~ ....... I"T'T'i'TTT'? ...... ~'"r'r"r"i'"r'r"r'~ ...... r"r'T"~ ...... ~-T"? .......... ~'T"r'?'",'T'T'T"~ ....
"tff'ff'"t ...... H"i'""H"i"i"'i"i"i'"H ....... ???".'"?,'"~, ....... ?'?,'"?"?~ ........ ??-',"'??"?'-,"+'~'"~"'.'"~-'-~'-+"? ...... ~"+-'?? ....... ~'"?? ....... ,'-'? ....... ? ....... ??-'? ....
::;::i::;:::i:::..__ ::Fi:::i::: :::::::::::::::::::::::::::::::::::::'"i'"i'"!'"H'"!'"H'"i ....... !-"H"+'+-+'-H--.i..-
................ "!'"i'"??Yi'"?'i ....... i'"i'"i'"i'"1'"i"'i'"i'"t ....... I'?Rq:H"i'"? ....... ?H"i~H"i"i ...... H"i"i ....... H'-H ....... H"i"i ....... H"i"i'''~
"?-'???'"~'"?'??'",'?'?"~'"~ ...... ~'"J'"~'"~ ....... ~---~'--~-'-i'--i---~...~-.-~.-.~ ....... ~.--~---~-.-~ ...... ~.-.4-.-~...~ ....... t-;...;...4 ...... '...~.-~.-.~ ....... ;.-.~-.-4.-,~.-.I..,~...~...~.,.~ ..... ~...~...~...~ ...... ~..,;..4...; ....... ~..4..4...~ ~.4..4...4...
...~..i...i.4 ...... ~...i.4..-.-~.4.4-~...I.4.4...~.4 ....... ~-..~.4.4.4...i.4.4.4 ....... i...~...i...~ ...... L4.4...i ....... i.L..~l .i...i ....... L.i...L.~...i...i...~...i.4...L~...i...~...i ...... i...i...i.4 ....... ~...~.4...; ...... i...i.4...i...
I''+'+''!'''~'''f''i'''~'''i''"'''~-4'''~'''½'''?'~'''!'''~'''~~ ! ! . ! ! ~ ~ ! ! ~ : ~ ~ ! ~ ....... ~'"~'"~'"~'"~'"~'"~'"~'"~
.......
!?..H-.H--H----i.--i.-~-.~.-Li.-i-.i.-i-.-:i--i...~-.!
:-'v"r'-r-~ ..... r'r"r"l-rff"ff-'~ ...... t'-f-ff--~ ...... f"f-'f-~ ...... ~"'i-fi ..... ~'"r'~--~,'f'~-~ ....... ~-e+..~ ...... ~.-+-+-~ ....... +..+-+.+.-'-.+.+.+..~ ...... ~.-+.+-e.t..?~-.+.-? ....... ~-.+..?~ ...... ~..+.+...i...
--W-'t-t-!"'t-'t--t---~t-t-t"!-'-?-~---~--~ ...... ~--'~--'~-'-? ....... ~'"~-'-H ...... ~ H .... ~ ~.~+...+++-~--.I.+-H.-.~ ....... H-++..I-..H.-.H ....... H.++-~-.-H-+-~ ....... H..-.H-..!.+.~-..H
"~"tT~?TTT'' TrT'?'!'"??' ???'
...?T..T..~I~IiI~llllllT...~".?..??T..?~...?~..+..i."~..+..~..+.+..~-i...~...~."~.~...~...{...~...~".`..+~...~...~...~.4...i...i...~...~...~...~...~..4 ...... ~...i.4...;...~...~...i...~...i...~...i...i...~..,~ ....... i.-i...~..4 ....... ~...~...~...~...f..~...~...~.4...
.+_t..ff..I.T..~...~_...~...~._ff...~...~...~...~...:...'"~'"?"~'"~ ...... ~"',"?'", ...... ,"'?"~'"~ ...... ?"?",-', ......
::::::::::::::::::::::::::: ::~:::~:::~:::~:::':::~:::~:::~:::~::::...~...~...~...~...'...~...~...~...~.......~...~...~...~ ...... ~...~...~...~......~...~...~...~.+.~...~..~...~..'...~...;..~...~...~...~...~..~...~...~...~...~...~....~ ....... ~...~....~...~ ....... ~...~...~...~...~...~_.~....~...~_.
--i--i-i-.i--t...H.-i--i ...... ffH.-i--~-H..i--i ...... H-'i--i---i-i"-?"H ....... H'-i---~"-i'+i"i"i ....... ?'i'"'H ..... H-i--"~ ....... i"i'"'?"~-'i'"H'"~'"'?'
-8000 ~000 -4000 -2000 0 2000 4000 6000 8000
~EST Ef:~T
WELL' K-14
( 1 909'' SNL,
1174' EWL, 'C 4, TllN, R14E)
VERTICAL
PROJECTION
~SS.
-4000 -2000 0 0 2000 4000 6000 BO00 ! 0000
· -T-'~-.-?-'-*; ....... t--+-.-k..4 ....... +---.k..H-~ ...... +'-'H-.;--'4.-' ~-.--:.--.F--~-'--; ...... .;..-?---H-~ ...... f....4..+..,: ...... H-..;..--.;.--~ ..... ~: .-.i...H.-b..~----k--*:...H.~ ...... ::'.--i...'i'"~ .......~t ?'--H.'k'--! ....... ?-.;-,f +-.l--k-f-H-~ .... ~-i--i--i-'t ...... H :-4-.
-.~...,~....L--~ ..... ¢...~,...4-4 ....... 4...`[...~...L..~-&.,L..&.L !...&..i...LL..~._~...L..,L..¢ ...... 4...¢...~,...J,...½...¢...&.~...&....4...&.¢...,L..~...L..~...&.~ ....... ~-.4...~...&.`[...&.`[.. ~...L...4-. ~. ,~..4 ...... L,.&4 ...........
...i...Li L.....L.L.L; ....... LL.LL.LLLL.L:i..LLL:':,...L..L.';..L.Li...L.i...LL.i...'LL ;...~ ....... LLL.LLL.L;...~ ...... L.i....!.._L.~...i...LL.! ...... ~. i.X...L!-LZL; .......
.... i'--!---¢'"{ ...... H--!"-f-':'-H"!-'-+ f"i.-.H----i--!-'~H-H'-i .... H-'-i'--ffi'--'i---{----i ....... ~'--f'f-'?-{"--i"f'f'-} ....... f-i'"-?'!'-'k'i-'-i"'i=i "+"?'-?"i-"i'"-i-"i'H .......
~..i...L.i...~ ....... L.L;...~, ....... L.;._L~ ......l t IL.i...LL.: .L..L.;...i ...... L..;..L.L.-.4...;...;..;..LL.L.L.~ ...... L.L.L.i ......l ;...;...;...; ...... L.L.L.L.LL..L..L~ ...... L..; .L..~ ......t LLL~ .......
.... ~'"~'"?'" ;~ ...... ?'"?'"?"? ....... ?'"?'"?"*?'"'~'"?'"?'"?-'-? ..... ~'"?'"'P"?" ~'"?'"'~"?"'? ....... ?'"?'"'~"'?'"t"'?'"'?'"¢'--?'"i '"'~'"?'-'?"*?'"'t'"'~'"-~'-'¢'" .'? ....... ?--'?--'?'"? ....... ?-"?'..'.~'--? ....... ?..-?--?-"~ ...... ?-?-.?-.!' ......
--t.--t--,:-t ........ H..+-.~ .... H..+.+.-!..+.4..4...f.. ]~]-b-.,:.-+-.t--,."-+4-~-.-b-.b+.-f++..f.+..f ..... :."-.H'-'H--.-F+-f.-+ ...... -b+-+.....k.I--.H...H ...... +-+...H..-b~.-+..;---.~ ...... H.--H-t'+-~---H"-
.... t"-t-'!--? ....... t'-i"i'"t ...... H"i'"? ....... ¢"i"i"?"_':i~'?'S.~. f'i"i ...... f'i'+'t'"t'"?'r? ...... i"'?'t'"t'"t'"?'!'"? ....... f"?r't"'!'+i'"~ ....... t"i"i"i"'i"i"i"i'"! ....... i'"?'"l"!"f"t'"f ....
'-i---!"'i---* ....... H..-H-~...H.-H ....... i--H-.-! ....... i.~.!~..~`~~~...H~H.~.i.~H...H...~..i~.~!...i~H~.H..~i~.!...*..~H~.~bh~H~.i...H ....... H...H ....... H..-!-..-; .......
.... y'?'¥'? ....... ?i----i"~ ...... t---c-'-.-.:--? ........ i'"?'i;'"~'~'~'[~I-"~'?'"? ....... i"'!"'?'"?l'"i'"?'"i'"??"?'"'i'-'?"T'?"??? ...... i"?'"i""i"'i'"'i'"F'i'"?'":'"?'"':: ....... i ...... F!?i .......
f..t.--¢..-t ....... :.'~%t---t ...... t.--t---t---? ....... t--f--?~-'-:---}--'~-'-¢"'¢"T'-¢---.*;'-~- "~.*..'"'~'"i"'i"'¢"'.¢ ....... ~'"i"'¢"'¢'"f"~'"T..'"'f"¢"'."'¢"'¢'"?;'"i"¢'¢'"}'"¢'"i ...... t---f..f...~ ...... }'"¢'"f"i'"i'"t"¢'"}'"i ....... ?¢'"}'"i ....
-'F,'"t"~ ....... ¢'"t'i'"i ...... ¢'"i'"i"i ...... i"i"i'"?":'"'?r"r"?F..'"'r'y"r"~"r't"'?'T'?"'r"r'~ ....... '?'F'r'T"?'"r'i'"~ ...... '~'"~'"~'"'; ....... ="F?'"~ ...... i'":...'"F? ...... .:-T?q ......
'","?~? ..... :.*-T"*:"T" "'?.-?":~? ....... FT'-F?'!"T"T"T'T",-'?'T"T"? ...... : '?.'"T'":.'"'FT'T'T"T ..... T"T'T"? ...... T'T'T"T" -T'T"FT" '-T'T'T".T ...... ?':.'"T"T ...... r'F".:-?'~"T"T'".':'"r"
-".*"'??"? ....... *.-'-?'-'~'-? ...... ?'+'+-': ....... ~'"'*"'.*'"?"l'"???.'r"f"?'"'?.'r".'t ....... ¢~'~"":L-~m"?"'? ....... ?.*-.-?.'?..~...?-.'r.--?.-.?-.-!...?.-?---'r-.-.t ....... ?.-.'r-..-r..'~ ...... ~---'t-..~--"r. ....... +.-.'r..?'--~ ......
-:H-bb.--H..-H---bb;:-+-H.--H.--bbi4..bbi4+-i.-bf ..... b¢-:.~i-.bbi...i ....... i4..bi.H..bbbb;.'...bb-b-.4...¢..4--} ...... bCH ....... H...H.--i--bbi-.b
...~...-.z....4..-4. ....... 4...4..4...4. ....... *-'-4.'-'~'"'~'"+"4.'"4.'"'~'"~""'"'4.'"4.'"4."* ...... *'"'~'"*'"4. ....... ~""4."~-i-:~h?"4.'"~'i'z"?';-"~'"4.'"f";'"'*'";'";'" !"'&'4."*'"* ....... '~'"4."4."'4. ...... 4."4."*"'* ...... 4.~'4."4.-'~-t-'4.-+-;-'~
· -.;.-¢.--¢.-.,~ ....... ,':..4..¢..-~..-H...b¢...;...L.L¢.-.~.....b¢-.-~....i..-!-..LH...¢ ....... H.--~...H--.J ¢...~x~...,':...H..+..H...b¢-..~-..¢...~.4...L.._..H....? ...... ¢--..i...bb~.L.h.;x ......
-.~---?-~i%-?--t---?.--.t---~.--?-i--i.-i..i---~-. '--~ni-?:'":: ....... ~--.-..'.'...~-i ....... i.-i---?.-!-+-t.-.~...i-i ....... ?.?.i.Vt:.Ri~.-i..~.Ai[~...!.-.~,£i~.t:-.I~.-i ..... i-~..-r-t-.
-..~.,..~....;-,.,m..........,..:,.... ....... .~-.-.....~...~...-~.---~....-..-,',,',~-....-~..-~....-.....+.......;...-~..--~ ....... ..-,...~....~...............4....;-~ ,..-.~.,-~,,.~.,,..~....~...4.,.;...~ ....... .-.....4..... ....... ....~...;,.... ..... 4...,...~.... ....... ....4....;..., ......
-.+..~.-L.L.'..~.-~.-.t-~ ..... ~ ................... ~ ................................... .~ .................. ? ....................... 4. ................. +....~...~..; ..... 4...~.....~..+..r..4....4....~.-; ...... ;-4....~..+ ...... ;'"4.'T"4.'"t'"f'+"
· : = : : . : ~ . : : : : : : . : : : : ~ : : : · : : : , = : : : . : : : . : ,, : : : : . : = : : t : = . ~ ~ . : , ~ = ~ :
· ..¢--4-..4...~ ...... 4...4...-;.-¢ ...... 4.-.4....4...4 ...... 4.--4-..' .... ,;...;-..4,...4 ...... 4.--;--.4..--~ ....... ¢-.4.--4...4-.-I---4.--4.-.4.-.4 ....... ¢-..4...; ..... 4...4.-..~.-.4 ....... 4.-.;,.--¢---;, ...... 4...4,.-.~--.4. ....... ~...4.-..~...4.... -..4...4....4...-4.-- b-4.-4.-.L.?
~.i...i..-¢.--~ ..... ~--L..~,..-i ...... ~---i..--~.--i ..... *'-..i.-.: ' . -i-.i-..J,-.i...H.i...i..'.i...i...~ .-i...L-.-~,..L..l...-L-.i-.i--`[ ....... ~...-L...~ ........ -L-.L..i--.~ ....... -~.-~-.-i-.~, ...... i.--,[...~-.-~ ....... ~...L..~...i ....... ~ ....... ~-..4 ........... ¢...¢-..-~ ...... ~...~...i...,L..
'"?"'t-'~?'" .......... b"?'~'"'~'t ....... ? ........... i ! ?'I"'?'-*'"'~J~l ...... ...... nl~hh{ : ~ ! ~?'"? ....... ? ..... q ?'"?'-?'"? .... ...... t ?'-?'"?'"? .... ....... ~~?'"? ....... '"'~"?'"' .... ! .............. ....... ?"?"'??-'~-'""'*"'?"'? ....... '"'?-?-? ...... 1 ?'-*'"?"~ ...... .......
..-~--.L!4 ...... 4--.LL! ...... LLL4...~...i...;..~...i-..L~...b4...Li-..L..~...~...~...i...L.~...Lb;...;.4 ....... .i....!...;...b.b~...L;.~...~...L~...LL.i...LLi ....... i...i...;..i ....... i..¢-Li .......
-+H'-i ....... '.'.'+H ....... ,.'"+4q-+H'-'~- +H'+H'+H ...... k-H-'+'i-+-':"H ....... ,:'-';'-++-i-H"H--'~'-4-~4~..~.~ 4--H--4-++".':'"~'-i'+'4-"; .......
· 'i'i' +-'?. ...... i-i .¢ ';" ' .+ i + ';' t-?---f--ilar "f"i'i'f ....... i' .t-f...? ...... f'f"f"i"T"f"i't"~ .... .t i"~"i'"r"f'*:' t-.i ....~]].? ~ i': ,4,-'~"i-'?.' ~"~ ..... f"t"'t'"'r",'"*:"i"i'": ....... :*--'r".*.'"r" "?"r"t"T-
i : ; : : : : : ~ : : : : : : : : : : : / : : = : : : = : : : : : , : : : ' : : : : : : : : : : : : : : : ~ : ; : I
..-4..-.~--.~-.,~ ....... .4--4..-.4---~ ............... 4.-.4..-4 ............ J~, ....... 4 ....... .4...?...~ ........... ~ .................. -~--`[..-~ ....... ¢-..4 ....... 4 ....... 4...-}.--.~ ........... 4--.+ ................... 4---,[..-4...4 ............... ~ ........... ~...~ .-~--4.-%4-? ......
......... ' : : : ' : : : :t : : : : : ~ ~ : ~ ~ : : : : : : ' ~''~ ': '~"
+.,:..+-.~....-4-;-4-4--.-4-H+H-H= .H--H..i+H...t.--:-+-..H..--;-{-++.-::--+-,..-f.iq.-.,;-.F.-.t.-.,;.-..,.:.-...T.-.;--.?:.-t--.-t-t-fr-'--.?.-?.--..,."-T.. bi-'"'"" ....... '"""-?'"-~ ....
'-t"T:'-f-! ....... f"f":?:-'! ....... f"t'"f"t'T".;'"..+"'t'~ '"T'TDn~nt'"t'"¢'"t ....... t".;..'"~"t'"T-t'-t-'t'"'..:'";"T'T'T'T"T-.'..-'.':"T"? ....... T-T"T'TTT'T-T"? ....... T'"T"'T"'~ ...... ~'"f"f"! ....... f"i'"f"~ ......
"'?"T"T'"T ....... .?'"T'"T'"? ....... ?'"?"~'".*.'"t'"T'"?'"? '?: ...... ?.'"?'"'..'"?'"t"'?'"T"'?'"?'" r'-?-.-?-'-?.'? ...... t'"',~'"?'"?TM '"?'"?'"t"'t'"t'"?'"t"'+'"? ....... ~'"y'"~'"?'"t'"?'"~'"?'"? ....... t'"'?'"y'?'" ,'"t'"T'"t"'*. ....... ?'"?'"t"'? ...... ?-'?-'t'"?
X::=Li::::':::t::;:::i:::i:::: X:::i:::t:::~:::Li:::!:::i:::L: X:::Yi:::LI:::~:::~:::!:::i::: ::::i::k:Li:::: :::!::k:::::? :::ki:::i:::i:::I:::ki:::i:::i::i :::i::i:::i:::i:::Li::Li::i::: X::.t:~::i:: :i:::::!X:::: :::!::!::!X:::
.... ~...~..~ ~ ...... ~ ~ i-~ .... ,:.; ~ 4 ...... ~. 4..~.5 ....... t..&..L.L.'...;...~...&.; ....... &4.. 14 ....... &.~.. ;-..~ ....... i...&.L.~ ....... L.~...~..~ ...... ~...L.~..t..L..~...~ 4.4 ...... L.&.;...L.,-..~,..&.t.4 .......
-~.--~-.-,[..-; : ' ~ ~ .+?..+.-~ ...... ~-++.+-.i.++.+.-? ....... t--+-+.+++.+.+-~ ....... ,-.+-+.-~ ....... i.-i...!...~ ....... LL.L.L !...LLi...i ....
, , ~ ~ ~"~'"~'"T r"c'r".~ ~'"~'"~'".~'"' ::: ::: ::: ::: ::: ::: ::: ::: ::: :::'Z ::: ::: ::: ::::...;..~.4..~ ...... ~...L~...~ ...... ~...~...~..~ ...... ~...~...,[...~...t.~...,[...~...~...~...~...~...~...~ ...... ;..L;..~ ....... ~...L~...~ .......
t"-r" .?"-*:
' ...... L..&.L.i..4 ..... &.&-i...~ ...... L.t..&.~ ...... &.&.i...i ....... i.-i...L.~ .......
.... i-T"T"T ....... T"T'T"T ...... T"T'T-T ....... T'"T'"T'"? ....
.... 4.-4.-..4--4 ....... 4..--4-..4-.4. ...... 4-.-4..--4.-.4. ....... 4.-4---¢-.-4 ....... 4-.4,.-.4--.4--4-...~-4---4...4-.-.-.4,--4--4--.4- ..... 4---4-.4*..4--. ~-4---4-~4-.-4 ....... 4...4...4-.-4 ...... 4.-.4.--4..-4 .... ;-.-4..-;,...4 ...... 4.-..4-.4..-4 ...... 4...-4..--4.-..4. .......
] ! ! .:- [ i ~ : ~ i : i : : : : i : : i : : : ~ : : : i : , : : : : : : : : : : ; : : : : ~ : : : : : : : : : : : :
.... : ........... : ....... ? ........... 4. ...... ,...4...., ........... ,...4....4....4. ........... 4....4. ....... ½...4....4....4. .......... 4-...,-.,..,.... ..m.4....,...,.- [.-,...4.-.,..., ....... 4....4.1..4....t ...... 4....4....4...., ....... ~...4....4....~ ...... ?.-4...+..? ....... +..+.+.., ....... +...t-.-?-..t ....... ?..14..-..t.-.t ....
lJJ!JJ~Jll~lilt ....... iJJJ~I jj~j'j~ ...... ~JJJ~JJl~lJJ~ JJJtJJJ~ Jll~lll~ll'~ ....... ~lJ J~lll~llJ~Jl Jt--J~Jll~lJl!--'~JJJ''+'f'f"i--:'~f+'f''f'~--i'''f''i'''~ ....... ~lli~J'l~lilt ...... ~'JJ~lll~JlJ~jj j'l%'}'''?'',.-t+t..-t.......t-..t.-.t-,.t.......t.-.t...t.,.t......t+t.,.t....
.... T'"T"T"T ....... T-'T"T-? ...... T"T'T"T ....... T'"T"T"T '"T'"T"'T'"T ....... T"T'T"T ....... T'"?T'T"~-TT'T-'T ..... T'T'T"T ....... T"T"T"T ?'-T"T"T ....... T"T"T"T ...... T"T"T"T ........ !"'T"T"T ...... T'"T"F'T ...... T'"T"T'"~
-.;...;-.4...4-.- .4.-.4...4...4... bb4..H ....... bb44.-4...4...;..4...4 ....... H...4...; ....... 4-.4-.;-4 .... ~¢4-¢.....-4..4...4...4 ...... 4...;......"-,4 ....... 4......."...4...4 ....... ;-..4...4...4 ....... 4...4...4...4 ....... ;--.4.-.4.-4...[...;...4...4...4...{..-4-.-4...;-..4...
.... .-.-¥.,..,,-.H.,j l .~,-,.-, ,.-,..-,-., ...... ??,-.., ....... :--?,-, .... ,--,---,-, ....... ,..-,.-.,...,...I...,...,...,..? ...... ,-..,.-.,.-,q.--,--.,...,.-., ...... ,.-.:--.,.-.?--1---,..-.,...,..,?. ....... :..~...,..,:.+.:...:...:...~...
--.b--&-~-~.~---~-&-~.:' .... ~,-.L.J,.-,[-.,...;..L.&.,~ ...... L.J,...;_,[...,[...&-L.&..; ....... &.J,.4...~, ....... ;...{....L.4 ....... ~...&.,L..&.t..t..&.~...~ ....... ~,...{...&.&.,[...~...;...;....~ ...... ;...;...~...&4...~...;...,[...; .......
...;..&.L.i..q....L.L+-i ....... L.L.,L..~ ...... ;...,L4...`[ ...... ~...L.L.,~ ...... &.J,...,L..&.~....L..&..L..L.,..&.,[...L.~ ....... ~...&..L..~ ...... ~,...t..t..~ ....... i...;..4...; ...... L.&.;...~ ...... L.~...L.~ ...... L4-4-.~ ......
12000
176.
PROdECTION ON VERTICAL PLANE 17S, - 9SG. SCALED IN VERTICAL OEPTHS HORIZ SCALE = 1/2000 IN/FT
.~)o r, cla,d AIo$I- a
F',odu¢ Hon Compon¥
PO ~o, 196012
INDEXED
DAI. L.,\S
ARCO STANDARD
CHEVRON ALASKA PRODUCT ()lq
EXXON 0ate: 02~24~88
TEXACO 78597
TO: T#:
MOBIL
PHILLIPS
CSTA~
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material ts being submitted herewith. Please acknowledge receipt by
signing a copy of this leTCer and returning It to this office:
02/02 88
02/08 ~88
02/08 I88
02/12 t88
02/12 ~88
02/03 188
01/27 t88
02/02 ~88
02/04 188
02/04 ~88
02/10 ~88
02/13 z88
01/28/88
01/24 /88
01/23/88
02/03 z88
01/25 z88
01/26 ~88
02/15 z88
02/10 ~88
Camco Static Gradient
Camco ,i ,,
Camco " "
Camco " "
Camco " "
Camco " "
Otis " "
Camco " "
GO "
GO "
Camco " "
Camco " "
Otis " "
Otis " "
Otis " "
Camco " "
Otis " "
Otis " "
Camco " "
Camco " "
Received --- ]-- .... Victoria Aldridge
Date ....
S~ondo,d Alaska
Pr o,duc ~qon Company
900 £o,., ~en,.on Boule~
PO [~o. 19601~
.%n( ho¢ooe. AIo%kO 9~
INDEXED
DALLAS
ARCO
CHEWO~ STANDARD
.ALASKA PRODUCTION
EXAXON
TEXACO Date: O1/26/88
TO: MOBIL T#: 78486
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being subml?¢ed herewith. Please acknowledge receipt by
signing a copy of this letter and returning it ?o this offlce:
A-12
A-13
B-3B
I>-3
D-18
D-18
F-8
F-19
H-9i
J-28
K-12
K-13
K-14
Y-24
CCL/Perf. 12/23/87 #1 8100-9230 GO 5"
Caliper Tool(Multifinger) 01/10/88 #2 100-8650 Sch 5"
Spinner/Hydro/Temp. on coil tubing 12/17-18/87 #1 9500-11055
Production Profile 01/08/88 #1 10400-10660 Camco 5"
Cont. Flow Survey 12/27/87 #1 10900-11200 GO 5"
Temp. 12/27/87 #1 10800-11200 GO 5"
Production Profile 0t/16/88 #2 10950-11250 Camco 5"
CCL/Perf. 12/25/87 #1 12200-12830 GO 5"
Injection Profile 01/10/88 #1 9500-10000 Camco 5"
Production Profile 01/12/88 #1 10790-11030 Camco 5"
Production Profile 01/08/88 #1 9150-9370 Camco 5"
Production Profile 01/18/88 #1 11800-12100 Camco 5"
CCL/Perf. 12/22/87 #1-4 10950-11730 GO 5"
PIT/Ftowmeter 01/09/88 #1 12828-13450 Camco 5"
GO 5"/2"
-'- 0'~ & GaS.
Date . ]-~ Utt~-- ~ Well Records LR2-1
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Da*e: 01/20/88
TO: blOBIL Y#: 79452
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
STANDARD
ALASKA PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge .receipt by
signing a copy of this letter and returning It to thls office:
~C-17
~C-19
~ C-20
~ C-22
~ H-02
~K-14
PITS 12/29/87 #1 10950-11360 Camco 5"'
PlTS/Flowmeter 12/31/87 #1 10950-11360 Camco 5"
CCL/Perf. 01/11/88 #1 9600-11541 Sch 5"
Perf. Record 01/16/88 #2 11305-11572 Sch 5"
CCL/Perf. 01/14/88 #2 11044-11476 Sch 5"
Completion Record 01/12/88 #1 12017-12433 Sch 5"
CCL/Perf. 01/15/88 #1 8625-10060 Sch 5"
CNL-CH PORO 01/13/88 #1 8450-9072 Sch 5"
Production Profile 01/06/88 #1 11500-11730 Camco 5"
Production Profile 01/06/88 #1 8800-9350 Camco 5"
PITS/Flowmeter 12/30/87 #1 8850-9300 Camco 5"
Anchorage
Rece i ved
Victoria Aldridge
INFORMATION CONTROC
Well Records LR2-1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
· Type of Request: Abandon [] SUspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing []
Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other []
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
¢. Location of well at surface
1909'SNL, 4106' WEL, Sec. 4, T11N, R14E
At top of productive interval
2750' SNL, 3811' WEL, Sec. 9, T11N, R14E
At effective depth
At total depth
3356' SNL, 3852' WEL, Sec. 9, T11N, R14E
5. Datum elevation (DF or KB)
KBE = 53.22 feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
K-14(23-9-11-14)
8. Permit number
87-95
9. APl number
5 0 - 029-21752
10. Pool
.Prudhoe Oil Po°l
1. Present well condition summary
Total depth: measured
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
true vertical
measured.
true vertical
Length
80'
2684'
10802'
1226'
measured
true vertical
11800' feet
8991 feet
feet
feet
Size
20"
13-3/8"
9-5/8"
.
Tubing (size, grade and measured depth) 4-1/2"
5-1/2"
.*
Plugs (measure~l)
,Junk (measured)
Cemented
\
Measured depth lrue Yertic~r'~lepth
8 cu yds concrete 110'
4185 cu ft ArcticSet II 2720'
2375 cu ft Class G 10830'
414 cu ft Class G 11800'
12.6tt @ 10485'MD
17tt@ 1997'MD
110'
2681'
8337'
8991'
R CEilfED
NOV ~ 0 Lq~7
Packers and SSSV (type and measured depth) Packer@ 10501'MD
SSSV @ 1971' MD
Alaska 0il & Gas Cons. C0mmissJ011
Anchorage
2. Attachments
Description summary of proposal [] Detailed operations program [] BOP sketch []
3. Estimated date for commencing operation
4th Quarter, 1987
4. If proposal was verbally approved
Name of approver
Date approved
5. I hereby certi~ .and
Signed~"~' , .. ~J _
correct to the best of ~ny knowledge
Title Division Drilling ~
Commission Use Only
Date
Conditions of approval Notify commission so representative may witness IApproval No.
[] Plug integri[~ D BOP.,,.~est [] Location clearance
I
Approved by ~/ ~ /~ : ....................... by order of
, . Commissioner the commission
Date
Form 10-403 Rev 12-1-85 Submit in triplicate
PBU NELL K-14 (23-9-11-14)
Permit Number: 87-95
Approval Date: 9/8/87
Well Status
Well operations were shut down after running 4-1/2" x 5-1/2" tubing,
nippling down BOPE, and installing the tree. A DIL/BHCS/CNL has been run
in the 8-1/2" hole and a gyroscopic survey has been run from PBTD to
surface. The 13-3/8" x 9-5/8" annulus has been downsqueezed with cement
and filled with non-freezing fluid.
Remaining Drilling Operations
The well will be completed by perforating underbalanced with wireline
conveyed guns. Perforations to be consistent to current development
strategy. Flow well for simple cleanup. Install sub surface safety
valve in ball valve nipple.
MAW/kb/2222D
STANDARD
ALASKA PRODUCTION
Rig: Nabors 18E
Well: K- 14
Daily Drilling Report-- PRUDHOE BAY
September 10, 1987 at 0600 hrs
Current Operation:
Nipple up riser.
0600 Depth: '
Day: - 1
24-Hour Ftg: '
Water Used:
Moved to K- 14. Nippling up.
Mud Type: WT: VIS: PV: YP: FL: Solids: Temp: °F
SURVEY MD ANGLE DIRECTION TVD SECq'ION COORDINATES DLS
DAI.I.AS
ARCO
CHEVRON
EXXON
TEXACO
TO: biO B I L
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
INDEXED
STANDARD
Al. ASk'/'.
Oate: 11/06/87
TI:
78298
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
~ C-11 Perforating Record 10/31/87 #1
~F-01 Production Profile 10/23/87 #1
"-J K-14 CBT 10/30/87 #1
~ R-07 Injection Profile 10/23/87 #1
~R-23 CCL/PERF. Log 10/23/87 #1
~ R-26A Temp. 10/16/87 #1
~/ R-26A Borehole Tracer 10/16/87 #1
~ U-3i Inj.Prof. Flowmeter Temp.10/24/87 #1
8400-9916 Sch 5"
8650-9152 Camco 5"
10400-11750 Sch 5"
9600-10356 Camco 5"
11250-12153 GO 5"
4700-6350 GO 5"
2039-7785 GO 5"
9100-9520 Camco 5"
RECEIVED
NOV 1 2 19B7
Rece i ved
Date
Alaska Oil & (]as Cons. Commission
Anchorage
Celina Plack
I NFORMA/I ON CONTROL
Well Records LR2-1
Standard Alaska
Production Compan.
9~)0 East ~enson Boulevard
PO ~x 196612
Anchorage, Atosko ~519-6612
{907) 564-511 I
DALLAS
CHEVRON
EXXON
TO:~ TEXACO
MARATHON
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
REFERENCE:
INDEXED
· STANDARD
ALASKA PRODUCTION
Da*e: 10/12/87
T#: 78228
SAPC OPEN HOLE FINAL LOGS
The following materlal Is being submitted herewlth. Please acknowledge receipt by
signing a copy of this letter and returning It to ?hls office:
DAL/UNIT/STATE:
DIL 09/26/87 #1 10837-11810 GO 5~ & 2'''~
BHCS 09/26/87 #1 10837-11783 GO 5~'~& 2"
LDT/CNL-poro 09/26/87 #1 10836-11809 GO 5~ & 2"--~
LDT/CNL-raw 09/26/87 #1 10836-11809 GO 5'~ 2" ~
Laserlog 09/26/87 10849-11750 GO 5"._
STATE ONLY:
Magnetic Single Shot Directional Survey
Gyro'scopic D~rec~~:!j~~~ ~-
Alaska Oil &'Gas Cons. G0mmJssi0n
A un;, of Ih. o,ig;nol S,ondo,d Gl
co~Aia, ch0rage
Founded in Clevelond. Oh,o. in 1870.
DIRECTIONAL SURVEYS
Date: 9-10-87
Date:
Job#: 0987-010
Job#:
Victoria Aldridge
INFORMATION CC~qTROL
Well Records LR2-1
Standard Alaska
Production Compan
900 East Bens. on Boule
P.O. Box 196612
Anchorage, Alaska 99519-6612
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TO: TEXACO
MARATHON
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
REFERENCE:
STANDARD
ALASKA PRODUCTION
Date: 10/02/87
Tt: 782
SAPC OPEN HOLE FINAL LOGS
The following material Is being submitted herewith.
slgnlng a copy of this letter and returning It to thls offlce:
DAL./UNIT/STATE:
K-14 MWD Resistivity-TVD 09/10/87 TELECO 7310-8290
K-14 MWD Resistivity 09/10/87 TELECO 9372-10772
Please acknowledge receipt by
11
STATE ONLY: DIRECTIONAL SURVEYS
Magnetic Single Shot Directiona_],~.ey_ Date: ~. Jobf/:
GyrOscopic Directional ~1~ ~ J~ Dat~.-~ A Jobf!:
Received ~~~ ,,]s~ ~ ~Victoria Aldridge
Date ~/' . _ n;~ % G~$ GOnS..GO~$~ Well Records LR2-1
A un;l ot the orlg;nol Stondord ~1 Co,~pony
Founded in Cl~-etond. ~,o. ,n 1870
Standard Alaska
Production Company
900 Eos! Be,~,,oc, Boulevord
PO J~ox 196bl2
Ant ho~ og~. Alos~ o ~5 I 9-60
~907) 564.5111
ARCO
EXXON
PHILLIPS
STATE OF AK
PDBY Systems (Transmittal Only)
SYSTEMS (Transmittal & Tape)
ARCHIVES
STANDARD
Date: 09/29/87
T~: 78203
SAPC MAGNETIC LIS TAPES & LISTINGS
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
K-14 OH Mag tape 09/26/87 Job //373664 800bpi Tape Pos. //05402
3 z/ 0 -open-/, Ol -
* EXXON: An Asterisk (*) next to a listing ab,~e means you should
have received the Tape~s) a_n/~.k~Pi~n~(s) ctir~q~ly from the respective
service c°mpany',//~l~~i ,~~~/~/~, .
/~~ SES CO~S. CO~i~u" Vic tot ia Aldr idge
.. _ Well R~ords ~2-1
A u,"t Ot lhe ot,9;,o| 5fondo,d 0,1
Fou-ded ,n C~e,elond. C~,o. ,n ~870
September 9,~ 1987
Mr. R. S. Allan
Division Drilling Engineer
Standard Alaska Production Company
P.O. Box 196612
Anchorage, Alaska 99519-6612
Telecopy:
(907) 276-7542
Re.:
Prudhoe Bay Unit K-14 ..........
Standard Alaska~ Production Company
Permit No. 87-95
Sur. Loc. 1909'SNL, 4106'WEL, Sec. 4, TllN, R14E, UM.
Btmhole Loc. 3439'SNL, 3685'WEL, Sec. 9, TllN, R14E, UM.
Dear Mr. Allan:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not indemnify you from the probable need
to obtain additional permits required ~by law from other
govarnmental agencies prior to commending operations at the well
site.
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so that a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. ~fhere a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
Very truly M0urs,
Lonnie C. Smith
Commissioner of
Alaska Oil & Gas Conservation Commission
BY ORDER OF THE COMMISSION
dlf
Enclosure
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Mr. Doug L. Lowery
Standard A/o~
Production C~ ~y
900 East Ben~m.l~'ulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTION
Alaska 0il & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen=
Well K-14 (23-09-11-14) PBU
September 8, 1987
In accordance with the Prudhoe Bay Field Rules and Standard's policy for
drilling the first well on a new pad or a pad previously drilled, a 20"
Hydril diverter system was used when drilling the surface hole on Well
K-9.
We did not experience any surface gas during the drilling of the 17-1/2"
hole on Well K-9 and believe it unnecessary to continue the use of the
20" Hydril diverter system on Pad K. We, therefore, request that Rule
4(b) of Conservation Order No. 145 be waived for K-14.
STANDARD ALASKA PRODUCTION COMPANY
R. S. Allan
Division Drilling Engineer
RSA/MSB/pm/2058D
cc: Well File #17
A unit of the original Standard O~1 Company
Founded in Cleveland Ohio in 1870,
4 C) I
IIII
ZO
4__o
I rlllllllll I I I II I LEthe' ~?
I0 20
~' K-2A
(Proposed)
30
ii i
OI
02
04
OI
O2
32
K-9
(Proposed) I
i
I ~
I
I
8 ~ 9
I ¢58o' hK-14
~ ~' ~(Proposed)
(Proposed)
(Proposed) K 7
225^,. (Proposed)
. tK-6 (Prqposed)
;,ooo' ?"~ -DJ
N
~i K-~ ~oo'
r
II
~P~ I~WELL K-I(As
(Pr oposedP I II [ ~
PAD DETAIL
SCALE: I"= 500'
PORT ION OF
T. II 8~ 12 N.,R. 14 E.,U.M
SCALE : I" = I/2 MiLE
SUPVEYOR 5 CIERf IFICATE
t HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND
LICENSED TO PRACTICE LAND SURVEY'NG iN THE STA'fE 0F
Al A~NA, THAT THIS PLAT REPRESENTS A LOCATION SURVEY
OF 7HE W~TL[PAD SHOWN AND THE WELLS 'THEREON, THiS
SU~,'EY WAS MADE BY ME OR UNDER MY DIRECT SUPERVISION,
AND ALL DIMENSIONS &NO OTHER DE'TAILS ARE CORRECT,
MO frOM HOtE LOCATIONS ARE FURNISHED BY OTHERS.
9/ ~/$?
.~.¢~/_~_. 6 /17'/87
8 /8/85
(~-~ ?/19/85
~.¢~- ~ !/14/83
10/a /8~
9127/83
9/~ 2/83
9 /t~ 183
8/~e/e3
7/26/83
ADD K-14 PROPOSED EIHL
ADD K-9 PROPOSED BHL
ADD K-5 PROPOSED BHL
ADD K--8 PROPOSED BHL
ADD K-7 PROPOSED BHL
REVISE K-6 BHL.
REVISE K .5 DELETED~ ADD K-G BHL
REVISE K-5 ADDED BHL
REVISE K-;5 ADD
REVISE K-4 A~)DED BHL
REVISE K-3 ADD K-2A
REVISE K-3 ADDED BHL
REVISE K-2 ADD PROPOSED BHL
REVISE K- I SURFACE LOC, FROM PROPOSED TO AS-STAKED,
REVISE K- I BHL.
- III III II I II IIIIIIIII II Illllllll IIIlrl -
(AS -STAKED)
PAD "K"
Located In
N_~W I/~4?_ROTRACTED SEC. 4 ,T. II N.,R.14E.,UMIAT...MER.,ALASKA
Surveyed for
SOHIO ALASKA PETROLEUM CO.
SUrveyed by
OCEAN TECHNOLOOY LTD,
LAND & HYDROGRAPHIC SURVEYORS
2502 West Northern Lights,Boulevard
Anchorage, Alaska A-'12847- 83
- I III I I III IIII I I IIII IIIII
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redrilll-'l,lb. Type of well. 'F-"X'l~lo"~i~ [-I Stratigraphic Testl-I Development OilEi
· Re-Entry [] DeepenCII Service [] Development Gas [] Single Zone [] Multiple Zone[]
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
Standard Alaska Production Company feet Prudhoe Bay Field
3. Address 6. Property Designation Prudhoe Bay Pool
P. O. Box 199612, Anchorage, Alaska 99519-6612 ADL 28303
4. Location of well at surface 7'. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
1909' SNL, 4106' WEL, Sec. 4, T11N, R14E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
3200' SNL, 3700' WEL, Sec. 9, T11N, R14E K-14 (23-9-11-14) KOO683449-G-14
At total depth 9. Approximate spud date Amount
3439' SNL, 3685' WEL, Sec. 9, T11N, R14E September 9, 1987 $200,000
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(M0andmVD)
property line
28304 1580 feet K-4 35 feet 2560 11925' MD, 8964' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25.035 (e)(2))
Kickott depth 1800 feet Maximum hole angle o Maximum surface 3300 pslg At total depth (TVD) 8800' 4390
Setting Depth
18. Casing program Specifications
s~ze Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data)
20" Cond. 80' Surface 110' 110' 8 cu. yds. concrete
17-1/2" 13-3/8" 72# L-80 Butt. 1935' Surface 1965' 1965'
17-1/2" 13-3/8" 72# S-95 Butt. 738' 1965' 1965' 2703' 2703' 3720 cu. ft. Permafrost
12-1/4" 9-5/8" 47# L-80 NSCC ' 4620' Surface 4650' 4500'
12-1/4" 9-5/8" 47# L-80 Butt. 6281' 4650' 4500' 10931' 8295' 2375cu. ft. Class G
8-1/2" 7" 26# L-80 IJ4S 1243' 10682' 8126' 11925' 8964' 340 cu. ft. Class G
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor RECEIVED
Surface
Intermediate S ~ P (') R ~,.) /
Production
Liner Alaska 011 & Gas Cons. Commissio.
Perforation depth: measured " Anchorage
true vertical
20. Attachments Filing fee~l~r' Property plat [] BOP Sketch E3" Diverter Sketch [] Drilling program []
Drilling fluid pro, ram [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[]
21. I hereby certify that the foregoing is true and correct to the best of my knowledge //
Si~lned .~ ~. ~ Title Division Dr#/ina Enc/ineer Date~//'~/~
Commission Use Only
Permit Number IAPI number IApproval,"d~+'a'~ See cover letter
~-~5" 15o-o'Z~l -- 7. ~¥~'7. I 09/09/87.f°r other requirements
Conditions'of approval Samples require..d [] Yes I~No Mud log required~/ [] Yes IF No
Hydrogen sulfide measures [] Yes I~ No Directional survey requ~re~ [] Yes [] NO
Required working pressure.J~r DOPE 1-12.1~ 1-13M; ,~5M; I-I10M; []15M;
Other: ~;'~'~~~ ~'~L by order of ~'"~"8~
Approved by ' ~' ~ Commissioner tne commission Date
Form 10-401 Rev. 12-1-85 ( Submit in triplicatu
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL K-14 [23- 9-11-14] PBU
Install and cement 80' of 20" conductor to surface.
The drilling fluid program will consist of an 8.5-9.5 ppg spud mud
in the 17-1/2" hole, a 9.0-9.7 ppg water base mud in the 12-1/4"
hole and a 9.0 ppg water base mud in the 8-1/2" hole.
Drill 17 1/2" hole to 2723' and cement 13 3/8" L-80//Buttress casing
to surface.
Install blowout prevention equipment consisting of 5000 psi W.P.
pipe rams, blind rams, and annular preventer. Maximum possible
bottomhole pressure is 4390 psi at 8800' TVDss based on original
resevoir pressure. Maximum possible surface pressure is 3330 psi
based on a gas column to surface from 8600' TVDss and an oil column
to 8800' TVDss.
Directionally drill 12 1/4" hole to the 9-5/8" casing point above
the Sadlerochit Sandstone. Run 9 5/8" 47~ L-80 mixed string of
Buttress and NSCC to within 5' of 12 1/4" TD and cement in two
stages: First stage using Class G cement around the 9 5/8" shoe.
The second stage to be downsqueezed in the 13 3/8" x 9 5/8" annulus
followed bynonfreezing fluid.
Directionally drill 8 1/2" hole to TD. Run 7" liner from TD to 250'
inside 9 5/8" casing shoe and cement using Class G cement.
Clean out to 7" float equipment. Change over to 9.6 ppg. NaCl
completion fluid. Test casing and lap to 3000 psi.
Run 9 5/8" production packer on internal plastic coated tubing with
a sliding sleeve. Set packer 50' above top of liner. A subsurface
safety va!ve with dual control lines will be placed 50' below base
of permafrost. Install and test Xmas tree. Displace tubing to
diesel. Set and test packer.
Shut down rig operations for perforating subsequent to rig release.
The well will be perforated in accordance with normal practices.
Tubing Size: 4 1/2", 12.69, L-80, A/B Mod, BUTT, IPC
Tailpipe Size: 4 1/2", 12.6~, L-80, BUTT
Note: NUDGE 75ft WEST, ACID JOB, TARGET RESTRICTION (200')
SWA: 7-JUL-87
W~'" K-14 [ 23' 9-11-14 ]
PROPOSED DEPTH
BKB
20" Conductor
110
Ball Valve
1965
13 3/8" Casing Shoe
17 1/2" Open Hole
2703
2723
4 1/2", 12.6#, L-80, A/B Mod, BUTT, IPC
9 5/8" Packer
7" Tieback Assembly
10631
10682
9 5/8" Casing Shoe
12 1/4" Hole
10931
10936
7" PBTD
7" Liner Shoe
8 1/2" Open Hole
11885
11925
11925
PBU
SWA: 7-JUL-87
B.O.P. STACK CONFIGURATION
13-5/8 IN. TRIPLE RAM STACK
5;000 PSI WP
DRILLING
ANNULAR
PREVENTER
! I
I !
PIPE RAMS
l
!
BLIND RAMS
I !
2 IN. KILL LINE
GATE
DRILLING
SPOOL
I
PIPE RAMS
l
4 IN. CHOKE LINE
I
GATE GATE
$1$DUA10:[DRAN022.J40]K14 CLOSAP SHORTT.LIS;6
Search Radius= 200 7 DEGREE LEAD LINE
For proposed well: K-14 [23- 9-11-14]
Location = W-E S-N TVD(SBS)
Top 671441.00 5975311.00 -65.00
Bottom 672842.47 5968633.21 8964.00
Note: Ail depths in feet Below Kelly Bushing (BKB)
7-JUL-1987
--- Closest Approach Analysis ---
Date: 7-JUL-87 Time: 08:34:33
08:34
Page
WELL IDENT
Closest Approach
/PROPOSED~ /NEARBY~
TVD DEPART TVD DEPART
A029-2101100
K-3 903.9 0.0 900.0 1.2
A029-2101400
K-2A 1203.4 0.0 1200.0 4.0
A029-2102300
K-4 2170.9 30.7 2167.0 10.5
SUMMARY
The well which comes closest to the proposed well is:
A029-2102300 K-4
Closest approach distance = 14.9 feet
KICK OFF for this run = 1800.0 feet
Vertical
CLOSEST /PROPOSEDX
DISTANCE TVD DEPART
187.6
71.3
14.9
Intersection
/NEARBY~
TVD DEPART
VERTICAL
DISTANCE
-.
$15DUA10:[DRAN022.J40]K14 CLOSAP SHORT.LIS;22
Search Radius= 200 COURSE LINE
For proposed well: K-14 [23- 9-11-14]
Location = W-E S-N TVD(SBS)
Top 671441.00 5975311.00 -65.00
Bottom 672017.46 5968512.12 8964.00
Note: Ail depths in feet Below Kelly Bushing (BKB)
7-JUL-1987
---- Closest Approach Analysis ---
Date: 7-JUL-87 Time: 08:33:43
08:33
Page
WELL IDENT
Closest Approach
/PROPOSED~ /NEARBY~
TVD DEPART TVD DEPART
A029-2101100
K-3 903.9 0.0 900.0 1.2
A029-2101400
K-2A 1203.4 0.0 1200.0 4.0
A029-2102300
K-4 2158.7 28.8 2154.8 10.3
SUMMARY
The well which comes closest to the proposed well is:
A029-2102300 K-4
Closest approach distance = 18.5 feet
KICK OFF for this run = 1800.0 feet
Vertical
CLOSEST /PROPOSED~
DISTANCE TVD DEPART
187.6
71.3
18.5
Intersection
/NEARBY%
TVD DEPART
VERTICAL
DISTANCE
$1$DUA10: [DRAN022.J40]K14 PROFILE.LIS;25 7-JUL-1987
Well= K-14 [23- 9-11-14]
Directional Profile
Course line
DRAN022 / 7-JUL-87 /08:35:34
TVD BUILD COMPASS RIGHT
MD (BKB) DEPART ANGLE RATE AZIMUTH TURN
0. 0. 0. 0.00 0.00 0.00 0.00
1800. 1800. 0. 0.00 2.50 176.47 0.00
3707. 3494. 748. 47.66 0.00 176.47 0.00
11601. 8811. 6584. 47.66 0.00 176.47 0.00
11925. 9029. 6823. 47.66 0.00 176.47 0.00
08:35
Page
Well= K-14 [23- 9-11-14]
Marker File
DRAN022 / 7-JUL-87 /08:35:34
Label TVD TVD MD DEPART INC
SS (BKB) ANGLE
KOP #1 1735. 1800. 1800. 0. 0.00
BASE PERMAFROST 1850. 1915. 1915. 3. 2.88
13 3/8" SHOE 2615. 2680. 2703. 176. 22.58
END OF BUILD ~1 3429. 3494. 3706. 748. 47.66
NSCC X/O 4500. 4565. 5296. 1924. 47.66
TOP UGNU SANDS 4700. 4765. 5593. 2143. 47.66
BASE WEST SAK FORMATION 6400. 6465. 8117. 4009. 47.66
IKRU-PBU 7800. 7865. 10196. 5545. 47.66
PACKER 8093. 8158. 10631. 5867. 47.66
TOP 7" LINER 8127. 8192. 10682. 5904. 47.66
9 5/8" SHOE 8295. 8360. 10931. 6088. 47.66
12 1/4" HOLE 8298. 8363. 10935. 6092. 47.66
TOP SAG RIVER SANDSTONE 8302. 8367. 10941. 6096. 47.66
TOP SHUBLIK FORMATION 8350. 8415. 11013. 6149. 47.66
TOP SADLEROCHIT 8420. 8485. 11117. 6226. 47.66
CURRENT GOC 8640. 8705. 11443. 6467. 47.66
TARGET 8746. 8811. 11601. 6584. 47.66
KAVIK (BASE SADLER) 8897. 8962. 11825. 6750. 47.66
TOTAL DEPTH 8964. 9029. 11925. 6823. 47.66
?l~-c TA~J~
TO
pIT
V,/AT6R
TRIP TANK
SAND ,,"
TYPE
E'ER
DISTRII~TION DI "r'c, / ., / / /'
PIT
- Choke .Manifold 1 - RecOrding drilling fluid pit 'level indicatOr with both visual and audio warning
- Poor Boy Degasser~_. . ~ ' ·
Brandt Vacuum. Typ~.egas~..r ~6~ 1 devices at driller's console '
- Trip Tank (75 BBL.) ,
Brandt Dual Tandem ~mle~ak~ 1
- Drilling fluid flow sensor with readout at driller's console
Pioneer Mud Cleaners~_ .-, //~ 11 - 5 Hp AgitatOrs
Pioneer M]<I Centrifug~/~ % '-~ '
· o
(8)
(i4 rnru 22)
(5) BO~:~- d/~.¢,~'~ e-~-~-
" (2.3 c=u 28) '
(6) ~ /,~/__~...
(29 r..bmz 31)"
rev: 01/28/87
6.011
1. Is dna po~m!~ fee ar'~m_had ........................................... v,O
~ ,,
2'. Is ~ to be locaued in a ~d pool .............................
.3. T.s ~e~ loc. aced proper ~ s~ce ~ pr'ope=r7 iina ..................
4. IS well located p~ d~-~rance ~ or. her wells .., .................
5. Is suffice undedicacad a~eag~ available in r_his pool
6. Is weI1 rm be deviated and .is we_l]bore p i au included ................
7. Is operauor the only affecued parry .................................
8. Can p~U be aooroved before fifu~-~ waiU ......................
9. Does operaccz: have a bond in force .................................. ~x5
10. Is a conservauion ord~w needed ......................................
1! Is adminis~uive appr. oval-needed '
12. Is ube lease ~er .mpprop. ria=e ..................................... ~
13. Does the ~ have a unique name and rmm~er .......................... v~
·
·
14 Is conducuor surir~ provided ~' ~__
15. Will surface casir~ procec~ fresh r,-a~er zones ....................... ,,/¢¢
16. Is enotmjh cemenu used co circ~taue on cond~uor and sub-face .........
17. W~!I cemsnu Uie iu re=face and inuemmediace or prodncuion sur~ ...
18. Will cemmnu cover all known prodncuive horizons .....................
19. Will ~I'L cas~ give adaqua, ua safety in coL~. se, tension and burs~..
20. Is ri%is ~ to be kicked off frcm an ~ suing wellbore ............
21. Is old w~bore abandonmenu proce~e included on 10-403 ............
22. Is adequate wellbore seoarauion, proposed ............................
For explorauory and S~-auigr-aphic w~!_l ~:
29. Are data presented on potenmLal mm_--prmssur~ zones? .................
30. Are s~i~c ~m~lysis dare presented on shallc~ gas zanas .... . ........
31. If an offshore loc., are survey resulr, s of s~_bed ccndi~Lcms pres enued ----
g%o/¢o. D~Y - I ~ o~u. S'5'O ii Lo KOI o~
· I i
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER *
* *
*
....... SCHLUMBERGER .......
*
* ............................ *
******************************
COMPANY NAME : BP EXPLORATION (ALASKA) INC
WELL NAME : K-14
FIELD NA~E : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292175200
REFERENCE NO : 97590
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 98/01/ 2
ORIGIN : FLIC
REEL NAME : 97590
CONTINUATION # :
PREVIOUS REEL :
COGENT : BP EXPLORATION, PRUDHOE BAY, K-14, API #50-029-21752-00
**** TAPE HEADER ****
SERVICE NAFIE : EDIT
DATE : 98/01/ 2
ORIGIN : FLIC
TAPE NAME : 97590
CONTINUATION # : 1
PREVIOUS TAPE :
COGENT : BP EXPLORATION, PRUDHOE BAY, K-14, API #50-029-21752-00
TAPE HEADER
PRUDHOE BAY
CASED HOLE WIRELINE LOGS
WELL NAME: K-14
API NUMBER: 500292175200
OPERATOR: BP EXPLORATION (ALASKA) INC
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 2-JAN-98
JOB NUMBER: 97590
LOGGING ENGINEER: S. DECKERT
OPERATOR WITNESS: D. WENDT
SURFACE LOCATION
SECTION: 4
TOWNSHIP: 1 iN
RANGE: 14E
FNL: 1909
FSL:
FEL: 4106
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING: 53.20
DERRICK FLOOR: 52.20
GROUND LEVEL: 24.30
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 9. 675 10827.0 47. O0
2ND STRING 7. 000 11800.0 26. O0
3RD STRING 4.500 10626.0 12.60
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH)
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: BCS
LDWG CURVE CODE: GR
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
BASELINE DEPTH
88888.0
11733.0
11723.5
11719.0
11707.5
11702.5
11702.0
11700.5
11694.5
11677.5
11677.0
11667.5
11663.0
11661.5
11660.5
11647.0
11626.5
11625.0
11620.0
11612.0
11611.5
11601.0
11595.5
11593.5
11587.5
11587.0
11579.5
11579.0
11565.5
11559.5
11553.0
11540.5
11532.0
11531.5
11518.0
11517.0
11507.5
11502.0
11486.5
11485.5
11481.5
11481.0
11466.5
11466.0
11457.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTD
..............
88888.0 88888.0
11707.5
11701.5
11695.0
11678.0
i1667.5
11664.5
11661.0
11647.5
11627.0
11625.5
11612.5
11603.0
11596.5
11592.0
11588.0
11578.0
11566.0
11561.0
11554.5
11541.5
11532.5
11519.0
11507.5
11502.0
11487.0
11481.5
11466.0
11457.5
11733.0
11723.5
11721.0
11708.0
11701.5
11698.5
11695.0
11678.0
11667.5
11664.5
11661 5
11647 5
11627 0
11625 5
11619 0
11613 0
11603.0
11596.5
11587.5
11578.0
11566.0
11561.0
11555.0
11541.5
11532.5
11519.5
11507.5
11502.0
11487.0
11481.0
11466.0
11457.5
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
11449.0 11449.0
11448.0 11448.5
11436.5 11437.0 11437.0
11424.5 11425.0
11424.0 11425.0
11421.0 11421.0 11421.0
11397.0 11397.0 11397.0
11385.0 11385.5 11385.5
11381.5 11383.0 11383.0
11379.0 11380.0 11380.0
11361.5 11362.5
11361.0 11362.0
11347.5 11347.5
11347.0 11347.5
11333.5 11334.5 11334.5
11328.5 11330.0
11328.0 11329.5
11320.0 11320.5 11320.5
11314.5 11314.5
11306.5 11307.5 11307.5
11303.5 11304.5 11304.5
11299.0 11300.0
11289.0 11290.0
11288.5 11290.0
11275.5 11276.5 11276.5
11272.0 11272.0
11271.0 11271.5
11245.0 11246.0 11246.0
11227.0 11227.0
11226.0 11227.0
11213.0 11212.0 11212.0
11206.0 11205.0
11186.0 11186.0
11185.0 11186.0
11173.5 11173.5
11172.5 11171.5
11154.0 11153.5 11153.5
11141.0 11142.5
11140.5 11142.5
11139.5 11140.0
11139.0 11140.0
11119.0 11120.0 11120.0
11106.0 11106.0 11106.0
11101.0 11101.5 11101.5
11097.5 11096.0
11093.0 11093.0
11081.0 11081.0
11076.5 11077.5 11077.5
11068.5 11069.0
11068.0 11069.0
11065.0 11066.0
11064.5 11066.0
11055.5 11056.5
11055.0 11056.5
11050.5 11050.0
11050.0 11050.0
2-JAN-1998 15:41
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
11047.0 11047.5
11044.0 11044.0 11044.0
11034.5 11033.0 11033.0
11022.0 11022.5 11022.5
11007.0 11007.0
11006.5 11007.5
11003.0 11003.0
10994.0 10994.0
10993.0 10993.5
10980.5 10981.5 10981.5
10978.0 10979.0
10977.5 10979.0
10973.0 10973.0
10963.5 10963.5
10962.0 10963.5
10955.0 10955.5 10955.5
10938.5 10938.0 10938.0
10924.5 10926.0 10926.0
10919.5 10920.5 10920.5
10898.0 10898.5 10898.5
10889.5 10889.5
10888.0 10889.0
10884.0 10885.5 10885.5
10875.5 10876.5 10876.5
10872.0 10873.0
10871.5 10873.0
10866.5 10868.0
10866.0 10868.0
10853.0 10854.0 10853.5
10832.0 10833.5 10833.0
10827.5 10826.5 10826.5
10813.5 10813.5 10813.5
10807.5 10809.5
100.0 100.0 102.0
$
REMARKS:
CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE CNTD
DATA AQUIRED ON BP EXPLORATION'S K-14 WELL. THE DEPTH
SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN
PASS #1 GRCH AND THE BCS GAM~A RAY, ALSO PASS #1 NPHI
AND THE BCS GAF~IA RAY, CARRYING ALL CNTD CURVES WITH
THE NPHI SHIFTS. NPHI COUNT FROM 10986'FID TO 10790'~ID
IS AFFECTED BY GAS IN THE WELLBORE.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
...................................
GRCH 11721.0 10790.0
CNTD 11734.0 10792.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
..............
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GR CH CNTD
..............
$
REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #1. THERE
ARE NO PASS TO PASS SHIFTS APPLIED TO THIS DATA.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
I1 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
** SET TYPE ~ CHAN **
.......................................................................................
NAFIE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
.......................................................................................
DEPT FT 1064295 O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CNTD PU-S 1064295 O0 000 O0 0 1 I 1 4 68 0000000000
NRAT CNTD 1064295 O0 000 O0 0 1 1 1 4 68 0000000000
CRAT CNTD 1064295 O0 000 O0 0 1 1 1 4 68 0000000000
NCNT CNTD CPS 1064295 O0 000 O0 0 1 1 1 4 68 0000000000
FCNT CNTD CPS 1064295 O0 000 O0 0 1 1 1 4 68 0000000000
CFTC CNTD CPS 1064295 O0 000 O0 0 1 I 1 4 68 0000000000
CNTC CNTD CPS 1064295 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CNTD GAPI 1064295 O0 000 O0 0 1 1 1 4 68 0000000000
TENS CNTD LB 1064295 O0 000 O0 0 1 1 1 4 68 0000000000
CCL CNTD V 1064295 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 11734.000 NPHI. CNTD 31.696 NRAT. CNTD 5.026 CRAT. CNTD
NCNT. CNTD 3408.284 FCNT. CNTD 722.222 CFTC. CNTD 713.650 CNTC. CNTD
GRCH. CNTD -999.250 TENS. CNTD 1570.000 CCL. CNTD 0.000
DEPT. 10790.000 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD
NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD
GRCH. CNTD 44.875 TENS. CNTD -999.250 CCL.CNTD -999.250
5.248
3638.188
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREFiENT : 0.5000
FILE SUF~4~Y
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 11721.0 10794.0
CNTD 11729.5 10795.0
$
CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
BASELINE DEPTH
..............
88888.0
11728.0
11716.0
11709.0
11701.0
11700.5
11698.0
11694.5
11692.5
11687.0
11681.0
11677.5
11674.0
11673.5
11670.5
11663.5
11661.0
11658.0
11649.5
11649.0
11634.0
11629.5
11626.0
11621.0
11619.5
11617.5
11613.0
11609.5
11607.5
11606.5
11599.0
11597.5
11596.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTD
..............
88888.0 88883.5
11723.5
11716.0
11707.0
11701.5
11698.5
11697.0
11694.0
11693.5
11689.5
11681.0
11678.0
11675.0
11674.5
11670.0
11664.0
11661.0 11661.5
11658.0
11649.5
11651.5
11635.5
11629.5
11627.0
11622.0
11619.0
11617.5
11614.0
11609.0
11606.0
11607.5
11599.5
11599.0
11596.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
11591.5
11587.0
11583.0
11573.5
11573.0
11571.0
11564 5
11561 5
11561 0
11559 0
11553 5
11552 5
11551 0
11532 5
11531 5
11529 0
11518 0
11513 5
11512 0
11510 0
11506 5
11505 5
11501 0
11491 5
11491 0
11481 5
11475 5
11465 5
11465 0
11458 0
11448 5
11445 5
11437 0
11436 5
11434 5
11428 0
11424 5
11416 5
11403 5
11398 0
11391 0
11390 0
11383 0
11382 5
11378 5
11373.5
11364.0
11362.0
11360.0
11350.0
11345.0
11344.5
11341.5
11334.5
11333.5
11592.0
11588.0
11583.0
11572.0
11568.5
11561.0
11554.5
11553.0
11532.5
11530.0
11518.5
11507.5
11502.0
11491.5
11481.5
11466.0
11448.5
11437.5
11425.0
11396.5
11390.0
11383.0
11380.0
11362.5
11346.5
11334.5
11573.5
11566.0
11562.5
11560.5
11554.5
11532.5
11529.0
11515.0
11512.5
11510.0
11506.0
11501.0
11491.5
11481.5
11475.0
11465.0
11458.0
11444.0
11436.5
11434.5
11428.5
11424.5
11416.5
11402.5
11391.0
11384.0
11378.5
11374.5
11364.5
11361.5
11350.0
11345.0
11341.5
11334.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
11330.0 11330.0
11320.5 11320.5
11319.0 11318.0
11312.5 11312.5
11312.0 11312.5
11309.0 11309.0
11308.0 11307.5
11305.0 11305.5
11304.0 11304.0
11300.5 11300.0
11290.0 11290.0 11290.5
11282.5 11283.0
11276.0 11278.0
11273.0 11272.0
11272.0 11272.0
11267.5 11267.5
11257.5 11257.5
11255.5 11255.5
11254.5 11254.0
11245.5 11246.0 11245.5
11230.5 11230.5
11227.0 11226.5
11226.5 11227.0
11223.0 11222.5
11218.0 11217.0
11212.0 11212.0
11206.5 11205.0
11199.5 11199.0
11192.0 11193.0
11189.5 11189.0
11186.0 11185.5
11185.0 11186.0
11182.5 11182.5
11166.0 11165.5
11158.5 11157.5
11147.0 11148.0
11143.0 11142.5
11139.0 11140.0
11131.5 11131.0
11127.5 11128.0
11119.5 11120.0
11119.0 11119.5
11108.0 11106.0
11104.5 11103.5
11098.0 11096.5
11086.5 11086.0
11080.5 11080.5
11076.5 11077.5
11068.5 11069.5
11067.0 11067.0
11065.5 11066.0
11061.5 11062.5
11060.0 11061.0
11057.0 11059.0
11056.0 11057.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
10
11055.5 11056.0
11051.0 11050.5
11049.5 11049.5
11047.5 11047.5
11046.5 11047.5
11043.5 11043.5
11041.0 11040.0
11031.5 11031.0
11027.0 11026.0
11025.5 11025.0
11022.5 11022.5
11022.0 11022.0
11016.5 11016.5
11006.5 11007.0
11006.0 11007.0
11004.0 11003.5
10997.5 10998.0
10997.0 10997.5
10985.5 10986.0
10984.0 10984.5
10983.0 10983.0
10980.5 10981.5
10977.5 10979.0
10965.5 10965.5
10964.0 10964.0
10962.5 10963.5
10955.5 10955.5
10955.0 10956.0
10950.0 10949.5
10943.5 10943.0
10941.5 10941.5
10935.0 10935.0
10915.5 10916.0
10914.5 10916.0
10907.0 10908.0
10905.5 10906.5
10897.0 10898.5
10896~5 10898.0
10891.5 10892.0
10889.0 10889.0
10888.0 10889.0
10885.0 10886.5
10884.0 10885.5
10878.0 10879.0
10876.5 10876.5
10871.5 10873.0 10872.0
10866.0 10868.0
10865.5 10867.5
10857.5 10858.5
10856.5 10857.0
10853.0 10854.0
10848.5 10849.5
10840.5 10840.5
10837.0 10838.5
10835.0 10836.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
11
10833.5
10832.0 10833.5
10818.0
10812.0 10813.5
10811.0
10803.0
10802.0 10802.0
100.0 100.0
$
10834.5
10816.0
10809.5
10804.0
101.0
REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #2. THE
DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN
PASS #2 GRCHAND PASS #1 GRCH, ALSO PASS #2 NPHIAND
PASS #1 NPHI, CARRYING ALL CNTD CURVES WITH THE NPHI
SHIFTS. THE NPHI COUNT FROM 10982'MD TO 10790'~D
IS AFFECTED BY GAS IN THE WELLBORE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1064295 O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNTD PU-S 1064295 O0 000 O0 0 2 1 1 4 68 0000000000
NRAT CNTD 1064295 O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE: 12
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
CRAT CNTD 1064295 O0 000 O0 0 2 1 1
NCNT CNTD CPS 1064295 O0 000 O0 0 2 1 1
FCNT CNTD CPS 1064295 O0 000 O0 0 2 1 1
CFTC CNTD CPS 1064295 O0 000 O0 0 2 1 1
CNTC CNTD CPS 1064295 O0 000 O0 0 2 1 1
GRCH CNTD GAPI 1064295 O0 000 O0 0 2 1 1
TENS CNTD LB 1064295 O0 000 O0 0 2 1 1
CCL CNTD V 1064295 O0 000 O0 0 2 1 1 4 68 0000000000
4 68 0000000000
4 68 0000000000
4 68 0000000000
4 68 0000000000
4 68 0000000000
4 68 0000000000
4 68 0000000000
** DATA **
DEPT. 11729.500 NPHI.CNTD 32.687 NRAT. CNTD 5.128 CRAT. CNTD 5.365
NCNT. CNTD 3673.373 FCNT. CNTD 722.222 CFTC. CNTD 719.617 CNTC. CNTD 3822.925
GRCH. CNTD -999.250 TENS. CNTD 1570.000 CCL.CNTD 0.000
DEPT. 10794.000 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD -999.250
NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD -999.250
GRCH. CNTD 52.375 TENS. CNTD -999.250 CCL.CNTD -999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER:
EDITED CURVES
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
13
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 11721.5 10792.0
CNTD 11730.0 10792.0
$
CURVE SHIFT DATA - PASS TO PASS (FIEASURED DEPTH) BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
.......... EQUIVALENT UNSHIFTED DEPTH ..........
BASELINE DEPTH GRCH CNTD
............................
88888.0 88888.5 88884.0
11728.0 11724.0
11715.0 11715.5
11709.0 11708.5 11707.0
11701.5 11701.5
11700.0 11698.5
11695.5 11695.0
11695.0 11695.0
11692.5 11693 . 5
11689.5 11691.5
11687.0 11688.5 11687.0
11680.5 11681.5
11677.0 11677.5
11673.0 11674.5
11671.5 11671.5
11665.5 11666.0
11664 . 0 11665.5
11661.0 11661.5
11660.5 11660.5
11658.5 11658.5
11652.0 11653.0
11650.0 11650.0
11647.0 11647.5
11639.5 11640.0
11639.0 11638.5
11633.0 11633.0
11627.0 11627.0
11626.0 11627.0
11621 . 0 11622 . 0
11620.5 11619.0
11618.0 11618.5
11613.5 11614.5
11613.0 11614.0
11607.0 11607.5
11606.0 11607.5
11602.5 11605.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
14
11601.5 11603.0
11600.0 11600.0
11597.5 11599.0
11596.0 11596.5
11593.0 11592.5
11587.5 11587.5
11587.0 11588.0
11581.0 11581.0
11578.0 11579.5
11573.5 11573.0
11572.5 11572.0
11569.0 11569.0
11565.5 11565.5
11560.0 11561.0
11554.5 11556.5
11554.0 11555.0
11551.0 11552.5
11541.0 11541.5
11533.0 11533.0
11531.5 11532.5
11527.5 11527.5
11522.0 11524.0
11518.5 11518.5
11511.5 11512.5
11510.0 11510.5
11508.0 11507.5
11505.0 11506.5
11501.5 11501.0
11496.0 11496.0
11491.5 11491.5
11483.5 11484.0
11480.5 11481.0
11480.0 11480.0
11476.0 11475.5
11471.5 11472.0
11466.0 11466.0
11465.5 11465.5
11458.5 11459.0
11453.5 11453.5
11451.0 11450.0
11448.0 11448.5
11444.0 11443.5
11437.5 11437.5
11434.5 11435.0
11429.0 11428.5
11428.5 11428.5
11424.5 11425.0
11424.0 11425.0
11421.0 11421.0
11416.5 11416.0
11409.5 11409.5
11404.5 11404.5
11402.5 11402.5
11398.5 11398.0
11397.0 11397.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
15
11391 5
11390 5
11383 0
11382 5
11379 5
11379 0
11373 5
11366.5
11364.0
11361.5
11359.5
11350.5
11346.5
11346.0
11334.5
11333.5
11322.5
11321.0
11319.0
11312.5
11309.0
11307.0
11305.5
11304.5
11300.0
11292.5
11292.0
11290.0
11283.0
11281.5
11280.5
11279 0
11273 0
11272 5
11264 5
11264 0
11249 5
11246.0
11241 5
11231 0
11227 5
11227 0
11221 5
11218 5
11211 5
11207 0
11203 5
11200 5
11190 5
11188 0
11186 5
11186 0
11183.5
11182.0
11172.5
11390.0
11383.0
11380.0
11366.5
11362.5
11351.5
11347.5
11334.5
11321.0
11318.0
11307.5
11304.5
11300.0
11293.5
11290.0
11281.0
11278.5
11272.0
11266.0
11246.0
11227.0
11222.5
11211.0
11199.0
11192.5
11189.0
11186.0
11183.0
11172.0
11391.0
11384.0
11379.0
11373.0
11365.0
11361.0
11345.5
11334.5
11321.0
11312.5
11309.5
11305.0
11293.5
11290.5
11283.5
11282.0
11273.0
11265.0
11250.5
11245.5
11241.5
11230.5
11227.0
11218.0
11205.5
11202.0
11186.0
11183.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
16
11164.5 11163.0
11159.5 11161.0
11152.0 11153.0
11142.5 11142.5
11138.5 11140.0
11130.0 11130.5
11124.0 11125.0
11119.5 11120.5
11119.0 11120.0
11102.5 11105.0
11089.0 11091.5
11083.0 11086.5
11080.0 11080.0
11077.5 11078.0
11076.5 11077.5
11075.0 11074.5
11072.5 11073.5
11066.5 11067.5
11065.0 11066.0
11061.0 11059.0
11060.5 11061.0
11057.5 11059.5
11056.5 11056.5 11055.0
11047.5 11047.5
11047.0 11047.0
11044.0 11044.0
11042.0 11041.5
11039.5 11039.5
11034.5 11033.0
11031.0 11031.0
11024.5 11025.0
11022.0 11022.0
11021.5 11022.0
11016.0 11018.0
11012.0 11013.0
11011.0 11010.5
11007.0 11007.0
11006.0 11007.0
11003.5 11003.5
10997.5 10998.0
10986.0 10986.5
10984.0 10984.5
10983.5 10983.0
10981.0 10981.5
10975.0 10975.0
10973.5 10973.0
10966.0 10966.0
10963.5 10964.0
10962.5 10963.5
10955.5 10955.0 10955.5
10947.5 10947.0
10941.5 10941.5
10940.0 10941.0
10926.5 10927.5
10926.0 10926.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE: 17
10920.5 10920.5
10907.5 10907.5
10906.0 10906.0
10898.5 10898.5
10888.5 10889.0
10885.5 10886.5
10885.0 10885.5
10883.0 10884.0
10878.5 10878.5 10879.0
10877.0 10877.0
10871.5 10873.0
10870.0 10870.5
10867.0 10868.0
10858.5 10858.5
10856.5 10857.0
10851.5 10853.5 10851.0
10846.5 10849.0
10837.0 10839.0
10834.5 10836.0
10833.0 10834.0
10832.0 10833.5
10823.5 10822.5
10820.0 10821.5
10817.5 10817.5
10812.5 10813.5
10805.0 10806.5
10804.0 10804.0
10801.5 10801.5
10796.0 10796.0
100.0 100.0 100.0
$
REM~ARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #3. THE
DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN
PASS #3 GRCH AND PASS #1 GRCH, ALSO PASS #3 NPHI AND
PASS #1 NPHI, CARRYING ALL CNTD CURVES WITH THE NPHI
SHIFTS. THE NPHI COUNT FROM 10982'MD TO 10790'MD
IS AFFECTED BY GAS IN THE WELLBORE.
$ $
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
18
TYPE REPR CODE VALUE
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
NPHI CNTD PU-S 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
NRAT CNTD 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
CRAT CNTD 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
NCNT CNTD CPS 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
FCNT CNTD CPS 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
CFTC CNTD CPS 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
CNTC CNTD CPS 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
GRCH CNTD GAPI 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
TENS CNTD LB 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
CCL CNTD V 1064295 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 11730.000 NPHI. CNTD 31.950 NRAT. CNTD 5.077 CRAT. CNTD
NCNT. CNTD 3592.592 FCNT. CNTD 722.222 CFTC. CNTD 731.967 CNTC. CNTD
GRCH. CNTD -999.250 TENS. CNTD 1555.000 CCL.CNTD 0.000
DEPT. 10792.000 NPHI. CNTD 18.448 NRAT. CNTD 3.333 CRAT. CNTD
NCNT. CNTD 6900.474 FCNT. CNTD 2033.898 CFTC. CNTD 2025.460 CNTC. CNTD
GRCH. CNTD 42.875 TENS. CNTD 1555.000 CCL.CNTD 0.000
5.278
3754.378
3.544
7002.933
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-I998 15:41
PAGE:
19
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
DEPTH INCREMENT O. 5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
..........................
1, 2, 3,
CNTD
REMARKS:
THIS FILE CONTAINS THE ARITHMETIC AVERAGE FOR PASSES
1,2, &3. THE DATA WAS CLIPPED AND DEPTH SHIFTED
BEFORE THE AVERAGE WAS CALCULATED. THE NPHI AVERAGE
IS AFFECTED BY GAS IN THE WELLBORE FROM 10982'~D TO
THE TOP OF THE LOGGING INTERVAL.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 40
4 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
2O
TYPE REPR CODE VALUE
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 25
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
NPHI CNAV PU-S 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
NRAT CNAV 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
CRAT CNAV 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
NCNT CNAV CPS 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
FCNT CNAV CPS 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
CFTC CNAV CPS 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
CNTC CNAV CPS 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
GRCH CNTD GAPI 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
TENS CNTD LB 1064295 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 11734.000 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV
NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV
GRCH. CNTD -999.250 TENS. CNTD 1570.000
DEPT. 10790.000 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV
NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV
GRCH. CNTD 44.875 TENS. CNTD -999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
21
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMFiARY
VENDOR TOOL CODE START DEPTH
...........................
CNTD 11760.0
$
LOG HEADER DATA
STOP DEPTH
..........
10787.0
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GAIViMA RAY
CNTD COMPENSATED NUETRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
22-JUL-97
CP 42.2
1103 22-JUL-97
11736.0
10737.0
10800.0
11734.0
1800.0
TOOL NUMBER
ATTC 708
CNTD 101
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
22
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
11800.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
SEA WATER
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO SWS BHCS DATED 9-26-87.
LOGGED WITH SANDSTONE MATRIX.
FLUID PACKED WITH 185 BBLS.
GAS IN WELLBORE NOTED ON MAIN PASSES.
THIS FILE CONTAINS THE RAW DATA FOR PASS #1.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 44
4 66 1
5 66
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
23
TYPE REPR CODE VALUE
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE ~ CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
NPHI PS1 PU 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
RTNR PS1 1064295 O0 000 O0 0 5 i 1 4 68 0000000000
TNRA PS1 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
RCNTPS1 CPS 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
RCFT PS1 CPS 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
CNTC PS1 CPS 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
CFTC PS1 CPS 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
GR PS1 GAPI 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
TENS PS1 LB 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
CCL PS1 V 1064295 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 11760.000 NPHI.PS1 31.897 RTNR.PS1 4.973 TNRA.PS1
RCNT. PS1 3648.079 RCFT. PS1 733.581 CNTC. PS1 3825.507 CFTC. PSi
GR.PS1 72.500 TENS.PSI 835.000 CCL.PS1 0.000
DEPT. 10787.000 NPHI.PS1 18.052 RTNR.PS1 3.107 TNRA.PS1
RCNT. PS1 6206.061 RCFT. PS1 1995.157 CNTC. PS1 6530.070 CFTC. PSI
GR.PS1 42.906 TENS. PSi 1585.000 CCL.PS1 0.000
5. 272
725.636
3. 491
1884.978
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
24
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAFIE : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 6
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUmmARY
VENDOR TOOL CODE START DEPTH
...........................
CNTD
LOG HEADER DATA
DATE LOGGED:
11756.0
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
10794.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
GR GA~M_A RAY
CNTD COMPENSATED NUETRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) :
22-JUL-97
CP 42.2
1103 22-JUL-97
11736.0
10737.0
10800.0
11734.0
1800.0
TOOL NUMBER
...........
ATTC 708
CNTD 101
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
25
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
11800.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM):
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
SEA WATER
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO SWS BHCS DATED 9-26-87.
LOGGED WITH SANDSTONE MATRIX.
FLUID PACKED WITH 185 BBLS.
GAS IN WELLBORE NOTED ON MAIN PASSES.
THIS FILE CONTAINS THE RAW DATA FOR PASS #2.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
26
TYPE REPR CODE VALUE
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~I CODE (HEX)
O0 000 O0 0 6 1 1 4 68 0000000000
DEPT FT 1064295
NPHI PS2 PU 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
RTNR PS2 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
TNRA PS2 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
RCNTPS2 CPS 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
RCFT PS2 CPS 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
CNTC PS2 CPS 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
CFTC PS2 CPS 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
GR PS2 GAPI 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
TENS PS2 LB 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
CCL PS2 V 1064295 O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 11755.000 NPHI.PS2 31.415 RTNR.PS2 4.919 TNRA. PS2
RCNT. PS2 3700.127 RCFT. PS2 752.224 CNTC. PS2 3880.086 CFTC. PS2
GR.PS2 82.813 TENS.PS2 905.000 CCL.PS2 0.000
DEPT. 10793.000 NPHI.PS2 18.413 RTNR.PS2 3.219 TNRA.PS2
RCNT. PS2 6857.143 RCFT. PS2 1990.521 CNTC. PS2 7032.876 CFTC. PS2
GR.PS2 47.750 TENS. PS2 1565.000 CCL.PS2 0.000
5.215
744. 076
3. 539
1957. 323
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
27
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : 001 CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 7
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUFkrlARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
.....................................
11758.0 10792.0
CNTD
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO)
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAF~VIA RAY
CNTD COMPENSATED NUETRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) :
22-JUL-97
CP 42.2
1103 22-JUL-97
11736.0
10737.0
1O800.0
11734.0
1800.0
TOOL NUMBER
...........
ATTC 708
CNTD 101
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
28
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
11800.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM I~OLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
SEA WATER
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REMARKS: CORRELATED TO SWS BHCS DATED 9-26-87.
LOGGED WITH SANDSTONE MATRIX.
FLUID PACKED WITH 185 BBLS.
GAS IN WELLBORE NOTED ON MAIN PASSES.
THIS FILE CONTAINS THE RAW DATA FOR PASS #3.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
29
TYPE REPR CODE VALUE
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELTO4 CODE (HEX)
DEPT FT 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
NPHI PS3 PU 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
RTNR PS3 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
TNRA PS3 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
RCNTPS3 CPS 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
RCFT PS3 CPS 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
CNTC PS3 CPS 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
CFTC PS3 CPS 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
GR PS3 GAPI 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
TENS PS3 LB 1064295 O0 000 O0 0 7 1 1 4 68 0000000000
CCL PS3 V
1064295 O0 000 O0 0 7 1 1 4 68 0000000000
** DATA **
DEPT. 11758.000 NPHI.PS3 32.381 RTNR.PS3 5.027 TNRA.PS3
RCNT. PS3 3602.905 RCFT. PS3 716.707 CNTC. PS3 3778.136 CFTC. PS3
GR.PS3 62.750 TENS.PS3 930.000 CCL.PS3 0.000
DEPT. 10792.000 NPHI.PS3 18.448 RTNR.PS3 3.333 TNRA.PS3
RCNT. PS3 6900.474 RCFT. PS3 2033.898 CNTC. PS3 7002.933 CFTC. PS3
GR.PS3 42.875 TENS. PS3 1555.000 CCL.PS3 0.000
5.329
708.944
3.544
2025.460
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
2-JAN-1998 15:41
PAGE:
3O
**** FILE TRAILER ****
FILE NAIVlE : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/01/ 2
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 98/01/ 2
ORIGIN : FLIC
TAPE NAME : 97590
CONTINUATION # : 1
PREVIOUS TAPE :
COIVlMENT : BP EXPLORATION, PRUDHOE BAY, K-14, API #50-029-21752-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/01/ 2
ORIGIN : FLIC
REEL NAME : 97590
CONTINUATION # :
PREVIOUS REEL :
COf4~ENT : BP EXPLORATION, PRUDHOE BAY, K-14, API #50-029-21752-00
RECEIVED
~BL 0 ~ 1~
Alask~ Oil ~s
K- 14
PRUDHOE BAY
commission
III
Run 1:
18 - June - 1995
CN/GR
Cased Hole
10790
1728
WESTERN
Logging Services
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
K - 14
500292175200
BP EXPLORATION (ALASKA) INC.
WESTERN ATLAS LOGGING SERVICES
26-JUN-95
6447.01
K. RICHARDS
K. COYNE
4
liN
14E
1909
4106
53.22
0.00
25.62
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL pASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
13.375 2719.0 72.00
9.625 10827.0 47.00
7.000 11800.0 26.00
4.500 10622.0 12.60
BASELINE DEPTH
10857.0
10860.5
10863.0
10863.5
10883.5
10884.5
10886.0
10898.5
10948.5
10949.5
10962.0
10971.5
10974.0
EQUIVALENT UNSHIFTED DEPTH
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
GRCH
10858.5
10861.0
10863.5
10864.5
10884.5
10885.0
10887.0
10899.0
10950.5
10951.0
10963.5
10972.0
10974.5
BHCS
GR
2
1
10-SEP-87
SWS
NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM OFF,
CALIPER & CASING CORRECTED,
SALINITY = 0.0 PPM.
SHIFT PROCEDURE AS FOLLOWS:
1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE
GAMMA RAY.
2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED"
FIRST PASS GAMMA RAY.
3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS GAMMA RAY.
4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS NEUTRON.
/ ? ?MATCH1A. OUT
$
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH
10790.0
10800.0
BASELINE DEPTH NPHI
10836.0 10835.5
10847.5 10848.5
10857.0 10858.5
10860.5 10861.5
10863.0 10863.5
10863.5 10864.5
10880.0 10880.5
10883.5 10884.5
10884.5 10885.0
10885.5 10886.5
10898.5 10899.0
10948.5 10950.5
10949.5 10951.0
10956.0 10956.5
10963.0 10963.5
10971.5 10972.0
10974.0 10974.5
10974.5 10975.5
10977.5 10978.5
10984.5 10984.5
10987.0 10987.5
11001.0 11001.5
11011.5 11012.0
11012.5 11012.5
11017.0 11017.5
11022.0 11022.0
11032.5 11033.5
11043.5 11044.0
11047.0 11047.0
11050.0 11050.5
11064.0 11065.0
11069.0 11069.0
11180.5 11181.0
11181.5 11181.5
11227.0 11226.5
11291.5 11291.5
11298.0 11297.5
11298,5 11298,5
11304.0 11303.5
STOP DEPTH
11718.0
11728.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
11307.0
11320.5
11326.5
11334.5
11346.5
11363.5
11364.5
11368.0
11377.5
11383.0
11389.0
11391.5
11392.0
11402.5
11419.5
11505.0
11516.0
11537.0
11546.0
11555.5
11587.5
11596.0
11602.5
11622.5
11626.5
11631.5
11656.0
11661.0
11665.5
11683.5
11692.5
11700.0
11707.5
$
REMARKS:
11307.0
11320.5
11326.0
11333.5
11345.5
11363.0
11363.5
11367.0
11377.0
11382.0
11388.5
11391.0
11392.0
11402.5
11419.0
11504.5
11515.0
11536.0
11545.0
11554.0
11586.0
11595.0
11600.5
11621.5
11626.0
11631.0
11655.0
11660.0
11665.5
11683.0
11691.5
11699.0
11706.0
PASS 1.
FUCT & NUCT WERE SHIFTED WITH NPHI.
GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY.
/ ? ?MATCH1B . OUT
$
CN : BP EXPLORATION
WN : K - 14
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
4 Curves:
Name Tool Code Samples Units
(ALASKA)
Size
API API API API
Log Crv Crv
Length Typ Typ Cls Mod
1 GRCH 2418 68 1 GAPI 4
2 NPHI 2418 68 1 PU-S 4
3 FUCT 2418 68 1 CPS 4
4 NUCT 2418 68 1 CPS 4
* DATA RECORD (TYPE# 0)
Total Data Records: 40
1006 BYTES *
Tape File Start Depth = 11760.000000
Tape File End Depth = 10770.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 9906 datums
Tape Subfile: 2 283 records...
Minimum record length: 62 bytes
Maximum record length: 1006 bytes
4 42 995 99
4 42 995 99
4 42 995 99
4 42 995 99
16
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH
10790.0
10800.0
BASELINE DEPTH GRCH
10794.0 10794.0
10836.5 10838.5
10837.5 10839.5
10847.5
10849.0 10850.5
10853.0
10853.5
10854.5
10864.0
10869.0
10870.0
10873.0
10876.5 10878.0
10880.0
10884.0 10885.0
10885.5 10887.0
10887.0
10887.5
10888.5
10891.0
10894.5 10896.0
10895.0 10897.0
10932.0 10933.5
10947.0 10949.0
10949.5 10951.5
10952.5
10956.0
10956.5
10958.0
10962.0
10963.0
10963.5
10978.5 10980.5
10979.5
10981.0 10982.5
10983.0 10984.0
10984.5
STOP DEPTH
11718.0
11728.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
NPHI
10849.0
10854.5
10855.0
10855.5
10865.5
10870.0
10870.5
10875.5
10878.0
10881.5
10888.0
10888.5
10889.0
10891.5
10953.5
10957.0
10958.0
10959.5
10962.5
10963.0
10963.5
10980.0
10985.0
10995.5
11000.0
11007.0
11010.5
11017.0
11017.5
11018.5
11025.5
11027.5
11028.5
11038.0
11038.5
11046.0
11049.0
11049.5
11052.5
11067.5
11068.5
11074.0
11076.5
11081.0
11150.0
11157.0
11161.0
11180.5
11181.0
11182.0
11190.0
11219.0
11230.0
11230.5
11232.0
11233.0
11234.5
11235.5
11238.0
11248.0
11260.5
11263.0
11265.0
11268.5
11269.0
11269.5
11272.0
11272.5
11275.5
11276.0
11276.5
11280.5
11287.0
11287.5
11288.5
11290.0
11291.0
11297.0
11299.0
11300.0
11304.5
11307.5
11314.5
11007.5
11027.0
11028.5
11040.0
11048.0
11068.5
11074.5
11082.0
11181.0
11232.5
11233.0
11269.5
11270.0
11272.0
11273.0
11276.5
11281.5
11288.0
11291.0
11291.5
11298.0
11299.5
11304.5
11308.0
11315.0
10996.0
11001.0
11011.5
11017.5
11018.0
11018.5
11028.5
11038.0
11039.0
11049.5
11050.5
11053.5
11069.0
11076.5
11151.5
11158.0
11161.5
11181.5
11182.0
11190.0
11218.5
11229.5
11230.5
11234.5
11235.0
11237.5
11248.5
11261.0
11264.0
11266.0
11269.5
11275.5
11276.5
11288.0
11288.5
11300.0
11317 · 0 11317 · 0
11317.5 11318.0
11319.0 11319.0
11321.5 11321.0
11326.5 11327.0
11327.5 11328.0
11328.5 11328.5
11329.5 11329.0
11330.5 11330.5
11333.5 11333.5
11336.0 11335.5
11337.0 11336.0
11350.0 11351.5 11349 · 0
11350.5 11352.0
11351.0 11350.5
11351.5 11352.5
11353.5 11353.0
11354.0 11354.0
11354.5 11355.0
11355.0 11356.0
11355.5 11356.0
11356.5 11356.5
11360.5 11360.5
11363.0 11363.0
11365.0 11364.0
11369.5 11369.0
11376.5 11376 · 5
11377 · 0 11376.5
11377.5 11377.0
11378.0 11378 · 0 11377 · 0
11386.0 11385.0
11386.5 11386.0
11389.0 11388.5
11389.5 11389.5
11391.5 11391.5
11411.0 11410.0
11415.0 11414 · 0
11417.5 11417.0
11438.5 11438.0
11441.5 11441.5
11450.0 11448.5
11450.5 11450.5
11466.0 11465.5
11467.0 11466.5
11469.5 11469 · 5
11474 . 0 11474 · 0
11502.0 11502.5
11502.5 11503.0
11519.5 11518.5
11522 · 5 11521.5
11523 · 5 11524 · 0
11524.5 11525.0
11525.5 11525.0 11525.5
11526.5 11526.0
11530.5 11530.0
11537 · 5 11537 · 0
11549.5 11548.5
11550.5 11549.5
11561,0 11560,0
11561.5 11560.5
11586.0
11588.0
11588.5
11590.5
11596.5
11607.5
11613.5
11616.0
11619.0
11622.5
11626.5
11654.5
11655.0
11656.0
11657.0
11671.5
11672.5
11673.5
11674.0
11678.0
11683.0
11689.5
11696.0
11696.5
11697.5
11702.0
11707.0
11713.0
11723.5
$
REMARKS:
PASS
FUCT
11585
.5
11588.0
11590.5
11596.0
11607.0
11612.5
11615.5
11621.
11626.
11655.
11655.
11656.
11671.5
11672.0
11673.0
11674.0
11677.5
11683.0
11688.0
11695.5
11696.5
11697.5
11701.5
11713.5
11587.0
11617.5
11656.5
11706.5
11723.0
e
& NUCT WERE SHIFTED WITH NPHI.
/??MATCH2A.OUT
/??MATCH2B.OUT
$
CN : BP EXPLORATION
WN : K - 14
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
4 Curves:
Name Tool Code Samples Units
GRCH 2418 68 1 GAPI
NPHI 2418 68 1 PU-S
FUCT 2418 68 1 CPS
(ALASKA)
Size
API API API API
Log Crv Crv
Length Typ Typ Cls Mod
4 42 995 99 1
4 42 995 99 1
4 42 995 99 1
4 NUCT 2418 68 1 CPS 4
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 40
4 42 995 99
16
Tape File Start Depth = 11760.000000
Tape File End Depth = 10770.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 9906 datums
Tape Subfile: 3 260 records...
Minimum record length: 62 bytes
Maximum record length: 1006 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH
10790.0
10800.0
BASELINE DEPTH GRCH
10794.0 10794.0
10836.5 10838.5
10837.5 10839.5
10849.0 10850.5
10853.0
10853.5
10864.0
10867.5
10869.5
10878.5
10890.0
10893.5
10894.5 10896.0
10895.0 10897.0
10900.0
10921.5
10947.0 10949.0
10949.5 10951.5
10950.5
10958.5
10959.5
10962.0
10964.5
10978.0
10978.5 10980.5
10980.0
10981.0 10982.5
10983.5
10984.5
10989.0
10989.5
10990.0
11000.0
11002.0
11003.0
11011.5
11012.0
STOP DEPTH
11718.0
11728.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH .........
NPHI
10853.5
10854.0
10866.0
10869.0
10871.0
10880.0
10891.0
10894.0
10901.0
10923.0
10951.5
10952.0
10960.0
10960.5
10962.5
10965.0
10979.5
10980.0
10981.0
10984.5
10985.0
10989.5
10990.5
10991.0
11001.5
11003.5
11004.0
11012.5
11013.5
11012.5
11015.5
11025.5
11026.5
11027.0
11027.5
11028.5
11033.5
11034.0
11038.0
11044.0
11046.0
11046.5
11051.0
11056.0
11057.0
11063.5
11067.0
11067.5
11071.0
11074.0
11081.0
11102.5
11111.0
11111.5
11112.0
11114.0
11114.5
11117.0
11120.0
11120.5
11132.5
11150.0
11153.0
11154.0
11158.5
11178.5
11180.5
11181.0
11182.0
11189.5
11190.0
11191.0
11221.0
11222.5
11223.0
11227.0
11231.0
11231.5
11232.0
11233.0
11236.0
11241.0
11252.5
11253.0
11255.0
11260.5
11268.5
11269.0
11269.5
11027.0
11028.5
11040.0
11048.0
11065.0
11068.5
11072.0
11074.5
11082.0
11120.5
11181.0
11232.5
11233.0
11269.5
11270.0
11014.0
11016.0
11027.0
11028.0
11028.5
11029.0
11034.0
11035.0
11045.0
11047.0
11052.5
11056.5
11057.0
11067.5
11103.0
11110.5
11111.0
11112.0
11114.0
11115.0
11117.5
11121.5
11133.5
11151.5
11154.5
11155.0
11159.5
11179.0
11181.5
11182.0
11189.5
11190.5
11191.5
11220.5
11222.0
11223.0
11227.5
11231.5
11232.5
11233.0
11236.5
11241.5
11254.0
11254.5
11256.0
11260.0
11270.0
11272.0
11272.5
11276.5
11277.5
11278.0
11279.0
11280.0
11280.5
11283.5
11285.0
11286.5
11287.0
11289.0
11290.0
11290.5
11293.0
11294.0
11297.0
11299.0
11300.5
11312.5
11313.5
11314.5
11316.5
11317.0
11319.0
11321.5
11326.5
11327.0
11329.5
11330.5
11332.5
11333.5
11339.0
11340.0
11350.0
11350.5
11351.5
11353.5
11354.0
11354.5
11355.0
11356.0
11358.5
11360.5
11363.0
11365.5
11367.0
11376.5
11377.0
11377.5
11378.0
11386.5
11387.0
11392.0
11409.0
11409.5
11410.5
~438.5
11442.5
11272.0
11273.0
11278.5
11281.5
11285.5
11287.0
11288.0
11291.0
11298.0
11299.5
11315.0
11319.0
11321.0
11327.0
11330.0
11330.~5
11333.5
11351.5
11352.0
11352.5
11356.0
11360.5
11376.5
11377.0
11378.0
11277.0
11277.5
11279.0
11280.5
11284.0
11287.0
11288.0
11290.0
11290.5
11293.5
11294.0
11301.0
11313.0
11313.5
11316.5
11317.5
11327.5
11332.5
11333.0
11338.5
11339.0
11352.5
11353.5
11355.0
11356.5
11358.5
11363.0
11364.5
11366.0
11376.5
11386.0
11387.0
11392.0
11409.5
11410.0
11410.5
11438.5
11443.0
.443.0
443.5
448.0
449.0
450.5
472.5
.475.0
486.0
488.5
502.0
502.5
519.5
.522.5
.525.5
530.5
537.5
549.5
550.5
586.0
~588.5
.590.5
.601.0
~602.0
_602.5
_608.0
.616.0
.618.5
.626.5
.640.5
.643.0
.654.5
_655.0
_656.0
.659.5
_661.0
~664.0
.673.5
_674.0
_683.0
.696.0
=696.5
1697.5
1699.0
1703.5
1707.5
1713.5
1717.0
11450.5
11502.5
11503.0
11518.5
11521.5
11525.0
11537.0
11548.5
11549.5
11585.5
11588.0
11590.5
11601.0
11601.5
11602.5
11608.0
11615.5
11626.0
11655.0
11655.5
11656.0
11673.0
11674.0
11683.0
11695.5
11696.5
11697.5
11713.0
11443.5
11444.5
11448.5
11449.0
11474.0
11476.5
11486.0
11488.5
11530.5
11601.0
11618.0
11641.5
11644.0
11659.5
11661.0
11663.5
11698.5
11703.0
11707.5
11716.5
CN
WN
FN
PASS 3.
FUCT & NUCT WERE SHIFTED WITH NPHI.
/ ? ?MATCH3A. OUT
/ ? ?MATCH3B. OUT
$
: BP EXPLORATION
: K - 14
: PRUDHOE BAY
(ALASKA)
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts;
arithmetic average of edited static baseline passes for all other curves.
DEPTH INCREMENT: 0.5000
PASSES INCLUDED IN AVERAGE
PBU TOOL CODE PASS NUMBERS
GRCH
2418
$
REMARKS:
CN
WN
FN
COUN
STAT
1, 2, 3
1, 2, 3
AVERAGED PASS.
GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 3
PASSES.
$
: BP EXPLORATION (ALASKA)
: K - 14
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
4 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH CNAV 68 1 GAPI 4
2 NPHI CNAV 68 1 PU-S 4
3 FUCT CNAV 68 1 CPS 4
4 NUCT CNAV 68 1 CPS 4
4 38 995 99 1
4 38 995 99 1
4 38 995 99 1
4 38 995 99 1
16
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 40
Tape File Start Depth = 11760.000000
Tape File End Depth = 10770.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 19812 datums
Tape Subfile: 5 63 records...
Minimum record length: 62 bytes
Maximum record length: 1006 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10782.0
2418 10792.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
11744.0
11754.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV SWIVEL SUB
PCM PCM/CCL
GR GAMMA RAY
CN COMPENSATED NEUTRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
18-JUN-19
FSYS REV. J001 VER. 1.1
1730 18-JUN-19
11756.0
11730.0
10800.0
11728.0
1200.0
YES
TOOL NUMBER
3913NA
8250EA/8248EA
8262XA
2418XA
0.000
11800.0
0.0
PRODUCED FLUIDS
0.00
0.0
0.0
0
1150.0
0.000
0.000
0.000
0.0
THERMAL
SANDSTONE
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN):
0.0
REMARKS: PASS 1.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
:K-14
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
8 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI 4
2 CNC 2418 68 1 PU-S 4
3 CN 2418 68 1 PU-L 4
4 LSN 2418 68 1 CPS 4
5 SSN 2418 68 1 CPS 4
6 CCL 2418 68 1 4
7 SPD 2418 68 1 F/MN 4
8 TEN 2418 68 1 LB 4
4 42 310 01 1
4 42 995 99 1
4 42 890 01 1
4 42 334 31 1
4 42 334 30 1
4 42 150 01 1
4 42 636 99 1
4 42 635 99 1
32
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 141
Tape File Start Depth = 11758.000000
Tape File End Depth = 10774.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
55246 datums
Tape Subfile: 6 216 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10784.0
2418 10794.0
$
LOG HEADER DATA
STOP DEPTH
11743.0
11753.5
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV SWIVEL SUB
PCM PCM/CCL
GR GAMMA RAY
CN COMPENSATED NEUTRON
$
18-JUN-19
FSYS REV. J001 VER. 1.1
1833 18-JUN-19
11756.0
11730.0
10800.0
11728.0
1200.0
YES
TOOL NUMBER
3913NA
8250EA/8248EA
8262XA
2418XA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
0.000
11800.0
0.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS/OIL RATIO:
CHOKE (DEG):
PRODUCED FLUIDS
0.00
0.0
0.0
0
1150.0
0.000
O.0O0
0.000
0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN):
0.0
REMARKS: PASS 2.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: K - 14
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
8 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI 4
2 CNC 2418 68 1 PU-S 4
3 CN 2418 68 1 PU-L 4
4 LSN 2418 68 1 CPS 4
5 SSN 2418 68 1 CPS 4
6 CCL 2418 68 1 4
7 SPD 2418 68 1 F/M/q 4
8 TEN 2418 68 1 LB 4
4 42 310 O1 1
4 42 995 99 1
4 42 890 01 1
4 42 334~31 1
4 42 334 30 1
4 42 150 01 1
4 42 636 99 1
4 42 635 99 1
32
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 141
Tape File Start Depth = 11757.000000
Tape File End Depth = 10773.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
55246 datums
Tape Subfile: 7 216 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10779.5
2418 10790.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
11744.5
11755.0
18-JUN-19
FSYS REV. J001 VER. 1.1
1937 18-JUN-19
11756.0
11730.0
10800.0
11728.0
1200.0
YES
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV SWIVEL SUB
PCM PCM/CCL
GR GAMMA RAY
CN COMPENSATED NEUTRON
$
TOOL NUMBER
3913NA
8250EA/8248EA
8262XA
2418XA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
0.000
11800.0
0.0
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
PRODUCED FLUIDS
0.00
0.0
0.0
0
1150.0
0.000
0.000
0.000
0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN):
0.0
REMARKS: PASS 3.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: K - 14
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
8 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI 4
2 CNC 2418 68 1 PU-S 4
3 CN 2418 68 1 PU-L 4
4 LSN 2418 68 1 CPS 4
5 SSN 2418 68 1 CPS 4
6 CCL 2418 68 1 4
7 SPD 2418 68 1 F/MN 4
8 TEN 2418 68 1 LB 4
4 42 310 01 1
4 42 995 99 1
4 42 890 01 1
4 42 334 31 1
4 42 334 30 1
4 42 150 01 1
4 42 636 99 1
4 42 635 99 1
32
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 141
Tape File Start Depth = 11759.000000
Tape File End Depth = 10774.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
90716 datums
Tape Subfile: 8 216 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 9 is type: LIS
95/ 6/26
01
**** REEL TRAILER ****
95/ 6/26
01
Tape Subfile: 9 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Mon 26 JUN 95 12:41p
Elapsed execution time = 9.56 seconds.
SYSTEM RETURN CODE = 0
LOGGING
COMPUTER
PROCESSED
ANALYSIS
Cc, rapanl~,, STAHDARD ALASKA F.'RODUC'T'ZOH CCt,
b~ll l< 't4 O,-'H AP.~ HUM; 50 .... n':.'"-]-21752
Fie. id PRUI}HOE BAY BATE OF JOB,'
Count,.~ HORTH SLOPE
S t .a t e: A L A S K A
Count. r.:¢ USA
CL I ENT FORMAT DATA
TAPE
LOG
I NF ORblA T ! ON
S T ANDARD
F ORMA T ( L , I
AP Z NUH: 5 O- 029-;2 i -~ ~ '-',. ..: ,=:
Fi e: I d: PRUDHOE Bi~Y
DA]"E OF JOB i 09-'.26-87
T~PE RECORDS
Pr'evious r.e~;i ~
Page 2.
Cc, ntinuatic, n ~: O~
S~-r. vicc nam.~z: :~.:GSF O~
Pr. evious %ape~ -
D a t e: 8 7/" 0 '.~ ; '~ 2 ':~.0 r- i g i n: , .. p ,:. n a m e: ,.~ ,... 6 6 :% C o n t i n u .:a i; .'i o n ¢$ 0 'i
File name: ~(15FOi , 001
Ha>::imum ienq=~:.n:' i024
Date:
Fite tppe: L.O
Previous: -f'ii,~::
M N E M
CN
WN
FN
C O U N
STAT
CTR:'/
SECT
TOi.,jN
RANG.'
EK8
EDF
EGL
PD
LMF
DMF
RUN
LCC
SON
LUii
FL
LUL
ENGi
Yi TN
TL!
~Li
TCS
TLAB
~HT
MR T
MT
MVIS
RMF
MFST
MFSS
RMC
MCST
MCSS
f' .- -3 p ":, 'r-,
i NFORMAT I L N RE ..L, RCS
.'.: O N T E i'-! T S
,U N I T T Y P E C R T G S ! Z E C: 0 [:, E
STANDARD ALASKA PRODLtCTZON C'O .................
i<-i4 O/'H APi NUbi; 50--0;29 .... 2i75;2 ................ ,
PF.:U[:'HOE BAY D,ATE OF -JOB: 09-26-,S';' ................
NO R't"H SL. OF'E
ALASKA ....................................
US A
i iN .....................................................
i4E .....................................................
5._-.4,2 00 ................ - ................................. FT
52,200 .................................................. FT
24,3 00 .................................................. F T
KB .......................
.~'37,., ..,64 , .............................................. ,
'7612
NORTH SLOPE ....................................
NORTH SLOPE
ROE[:,ER .....................................
C: U N N i N G H A
i i SOO, OOO ............................................... FT
ii8~4, OOO ' FT
i OOOO, 000 , ....... FT
i i8i O, OOO ............................................... FT
0 ~OO HR
9,5 0 0 ................................................... H R
t~-° 000 DEGF
i 78, O00 ................................................. DEGF
DSP SOLTEN ....................................
FLOWL Z I',tE ....................................
,..o, OOO ..................................................
i, ,5i0 ...................................................
71 , 800 ..................................................
bIERS
2,560 ............................................. , .....
75,200
MEAS .............................................
CP
OHi"iM
OHMM
L r..1SF
O H M M
DEGF
o
0
0
0
'0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
'0
0
0
0
F' ..-:~ g e 4
C 0 H H E N T
R E C: iD R D
~i N E i'i S E P.. V I C E U H I T H N E H S E R V t C E ij N i T
DEF'TH FEET DEPT FT
TEN D iL. BHC LBS TENS DiL. BHC: LBS
SP DIL. BHC AP! SP Dii_BHC APl
~R DILBHC GAF'i GR DiLBHC ~]APi
i LD D ILBHC OHMH iLD [:,iLBHC: OHHH
iLH DIL. SHC: OHMM ILH D!LSHC OHHH
L!_J~ DILBHC OHMM LLA DiLBHC OHHH
[:,T DiLBHC US/F DT DiLSHC L".=.,' ..... h
C:ILD DiLBHC HHHO C:ILD DILBHC HHHO
ENTRY BLOCK LEGEND
:+: :'f-: :'~ :44 :.A. :,I': :~ :,i': :~ :¢ $ :+: :'t': :i': :.I': W. :~
TYPE [:,ESCR I PT i Of..i
F: OR H H
"'"' 7' '?' F-. .
oF' EU 1 F i ,... A T i OHS
T Y P E $ i Z E C 0 t) E
0 i 6 6
DP. TN FORMF T .... iF i C:AT ION®
+.' :+' :e: ,*. D A T U i'i S P E C i F i C ~ T i 0 N 8 i_ 0 C K S * :~- :~ =~.
::.~t:N,~ i CE SER9 i CE
MNEH ID ORDER ~
APl APl APl AP:.[ F ]: L.E
UNIT LOG TYPE CLASS HOD -~
[:, E P T -¢. ..... · .... 4
T E N S D t' '"" '" ,' ...~ b ~: 4
b c, H ,_. '7" ..... ' '""
·
SP DiLBHC .$73654
· ~]R D i L. BHC ':7366.:, 4
ILl) DiLBHC: ,~77664
iLH DiLBHC 3 ,"-'.3664
LLA [:' i LBHC $73664
DT D ILBHC 37:~664
CiLD r~ILBHC,. '"~7S664
F T 0 0 0 ,:' 0 4 0
t. 8 S 7 0 0 0
¢~P i 7 i 0 i 0 0 4 0
GAP i 7 54 i 0 Ct 4 0
OHMM 7 i 2 0 46 0 0
OHMH 7 i 2 O 44. 0 O 4 0
OHMH 7 220 6 0 0
U S ,." F 7 8 -" '"'.:, ,~:. 0 0
t, iMHO 7 68 46 0 0 4 0
68
~b b'
68
68
F' R 0 C E S S i i'-.i [:, i C A T :0 F: S
DEPT
SP
GR
R E C 0 R D S
i i o 7< q 000
I OOO, OOO
i i 7.z.c , 000
i 9 i , 867
I i 638. 000
· '3. 6,983
J i ""
· ~,38, OOO
24.,2i 0
t i ,4.38, 000
38.37i
..... 8, no0
i i,.-.."; 7,;"' ,.. :~ 000
i5,849
000
594
i i 07..8, 000
i6. 749
i 0938. OOO
._e bi4
i 0838, 0 O O
363,9t5
i 449, 000
4i~
.... .z,, 000
4t6'2,000
4094, 000
4 065., 000
4055, 000
4 006, 000
4021 . 000
4026, OOO
3947,000
3899,000
0, 000
i 0 i , 000
5 .,3, '200
6'2,400
i i ~S. 300
i.S5. i O0
ti2,000
i 21 , 700
i43.000
151 ,500
i '99,800
0 O0 c,.
i0i ,700
2 8, ,._,° 0 0
6 600
8 '2 00
47"' 000
7 400
9 000
25 400
5i 100
97 400
,4 t
26
29
63
i 04
59
_
i 000
04 0
; 05
062
5i2
096
704
748
i 00000, 020
'2 0 941
29 7t7
'21 727
34 .':.:";9,i.
60 ._'3',95
·
41 305
i 671
27
'20
2 ,£
43
7..5
58
2i
i 000
848
542
;2 tt
749
652
858
884
6,27
275
82
99
9 0
i 49
000
b U U
Fi 00
000
20 0
9 00
900
sO 0
300
._'300
File name,: ,:,.~b;-,O'l , 00~,
T R fi }~ L E R R E C 0 R D S
Fiie, type: LO
F ~. i ,.=.: t.,.¢pe: LO
! ii
i NFORMR T !., ON, E r' 0 R Dc'. , ..,
M N E M C: 0 H T E iq T S U H ! T T :'/P E C' A T G S i Z fsi C 0 [;, E
C N
i.,JH
FN
C 0 U H
STAT
_. t
SECT
T 0 l.,j N
EKD
b. L)I--
EGL
PO
L M F
D M F
R U N
L C: C
S 0 H
LUH
Fi..
LUL
ENG i
W I T N
DE'.,
DL
'fL i
TLA8
BHT
MR T
MT
MViS
RM
RM F
MFST
MFSS-
R MC
MCST
M C S S
STAN[:,ARD ALASKA PRODUCTION CO
~.~ - j 4 0 ,." H A P i N U M
~:'" DATE OF
P R U D H 0 E ,~, ~-~ 'r 09 .- 26-
N 0 R T H S L 0 P E .................................... 0 0 ':,20 65
A L R S i< A ................. 0 0 20 6
'i'---'" 0 0 20 6
l_ ,=, t-~ , .............................
04 ....................................................... 0 0 2 65
i 4 E ..................................................... 0 O E'; ¢, 5
53,2 00 .................................................. FT 0
~ '" O0 FT O
2 4,7_400 ................................................... F T 0
M S ..............................................
K B ...................................
KB .................................. 0 ] '-'
i ....................................................... O, 0 1:2 ,'"
.30 .............................................. ........ 0 0 2 7' 9
· .%73664 .................................. . .............. 0 0 iO 65
,.~i2 ..................................... 0 0
NORTH SLOPE .................................... 0 0 20 65
NORTH SLOPE .................................... 0 0 20 65
CUNN iHGHAM .................................... 0 0 20 65
i 1800, OOO ............................................. ; , , t'-"T 0
i!8'i4 OOO ........ Fi" 0 ~ " 6:.9
i 0000. 000 ............................................... FT
iiSi O, OOO ............................................... FT 0
22 ~'00 HR 0 2 4 68
9. '"'c,_, L{O ........................................... ........ HR 0 4 4 68
i 78,000 .................................................
i 78, 'O 00 ................................................. DEGF 0 i 4 6;.'8.'
DSP S 0 L T E ::..',' .................................... 0 ';,..: '20 65
&._.,
FLOWL l NE 0 ';' '--' 0 '
, . .
38,0 O 0 .................................................. CP O ';' 4 68
I , 5 i 0 ................................................... OHMM 0 2 4 68
i , 37 0 ................................................... 0 H bi M 0 2 4. 68
7 i , 80 O .................................................. DE~]F 0 '2 4 68
i"i~R._~ ............................................. 0 2 i 2 6, 5
2,560 ................................................... OHMM 0 2 4
75.,200 .................................................. DEGF 0 2 4 6.._--;
MEAS 0 .z, i '~ ;-5
i , . ,.. , . ,~ , , , . . , ,. . , , . , , . ,, , , , .. , . r . . , , . . . . , ,~ . . , , . , ~ ~ '-"
F' a g e i i
R E C': O R D
i"ihi E.H S E R',,,' i CE UN I T HFiEH
[> E P T H F E E T [:, E P T
T E N i S L C:, C i'.~ S L. B S T E N S
CALi ~ SL. DCNS iN CALI
R H 0 S ~ S L D C N ~:~ G /C 3 R H 0 B
DRHSi SLDCNS G/C3 DRHO
FCHL ~ SLDCNS CPS FCNL
N C: H L t S L [> C: N S u~.~ ~' '~ N C: N L
L. SDP i SLDCNS C:HAN L S[:,P
C:UPEi . SLDCNS CPS CUPE
SSDP'I SLDCNS CHAN SSDP
~:~tJA L I SLDCNS ~?UAL
FSL. D ! SLDCNS L:P'5 FSLD
NSLD ! SLDCNS CPS NSLD
LPCT I SLDC:NS CPS LPCT
L C C T 'i S L D C N S C P S L. C C T
Sr.C:Ti ,q, ~.~,~. . __
...... L~-,~ O CPS ~;L:L: T
PEF t SLDCNS B/EL PEF
SERVICE UNiT
FT
LDTCNS LBS
i.. [:, T C N S G A F' i
L [:, T C N S i Fi
I..DTCNS
L. [:, T C: N S G ,.." C; .S
L [:, T C: N S C P 'S
Lb'] brqo C:PF;
L £:, T C N S C: H ~ N
L[::TCNS CPS
L [:, T C N 5; C ia ~. N
LDTCNS
LDTCNS CPS
LDTCNS CPS
L [:, T C f4 ::; C P S
L. [:, T C F:i S C: P S
L £:--' T C N S C: P
, r.~ ].. ,--., 4 ,-.
~..~.. , ,_.~'.,.-, B,-"EL
DPHS ~
NPHS i
RAT ~
SLDCNS
SLDCNS
SL.[~CNS
PU
SSPU
DPHi
NPHi
NRAT
LOTCi'.iS
LDTCNS
L.C:TCNS
F:' Li
PLJ
' '
DATA FORMAT
ENTRY
TYF'E S i ZE C:ODE
0 i 66
P a g '~:
ENTRY BLOCK LEGEND
TYPE DESCRIPTION
0 't"er. mina+..or ( no more entr
[)ATA FORMAT
DATUM SPECiFiCATiON BLOCKS
SERVICE SERVICE APi APi APi API FiLE
MNEM ID ORDER f~ UNIT LOt TYPE CLASS biO[:, ~
DEPT ~:7S664 FT O 8
TENS LDTCNS 37~66'i. LBS 45 0
GR LDTCNS .~; ,'.~ a,, 64 GAPi 45 54
CALi i_DTCNS .373664 iN 45 24
RHO8 LDTCNS '~7:;664 G/CS 45 94
DRHO LDTCNS 373664 G,."C3 45 tOO
FE:NL LDTC:NU ~,-S664 CPS 40 ,.8
NCNL LDTCNS .]47~664 CPS 45 78
LSDP LDTCNS 37~;664 CHAN 45 0
C:UPE LDTCNS 373664 CPS 45 0
SSDP LD'i'CNS ~7i;664 CHAN 45 0
g~'I.J A LLDTCNS 37~664 .......... 45 0
FSLD LDTCNS S7.~664 CPS 45 0
HSLD LDTCNS 37._-4664 CPS 45 0
LPCT LDTCNS .~73664 CPS 45 0
LCCT LDTCNS 37G664 CPS 45 0
SCCT LDTCNS 373664 CPS 45 O
PEF LDTCNS S73664 B/EL 45 O
DPH! LDTCNS ~7S664 PU 45 i22
NPHi LDTCNS 3,.'"3664 PU 45 i22
NRAT LDTCNS 37b'664 45 i 64
0 0 0
0 0
'i 0 i
2 0 i
I 0
i 0
._, t 0
,:, 0 0 i
0 0
0 0
0 0
0 0
0 0
0 0
0 0 i
0 0 '!
0 0 i
O 0 i
!'2 0
i 0
PRC ~
SiZE LYL :-]MPL RC
4 0 i 68
4 0 i .¢., p,
4 0 i 68
4 0 i 68
4 0 i 68
4 0 i. 68
4 0 i 68
4' O i 6, 8
4 0 i 68
4 O ~ 68
,4 0 i 68
4 O i 6'8
4 0 i 68
4 0 i 68
4 O i 68
4 0 i 68
4 O i 68
4 0 i 68
4 0 i 68
4 0 i G'-"
PROCESS iH[:,iCATORS
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 000000 OOO000
000000 000000 000000
000000 000000 000000
000000 -O0000O 000000
000000 000000 000000
O00000 000000 000000
000000 000000 O00F~O0
000000 000000 000000
000000 000000 000000
000000 000000 000000
000000 O0000F~ 000000
000000 000000 000000
000000 000000 OliO000
000000 000000 000000
000000 000000 000000
14
D ~ P T
L S D P
SCCT
T E N S
C U P E
PEF
SS['P
DPHi
DA.
C¢~L t
QUAL
N l~ H t
TA
REPORD o
RH08
DR HO
N S L D
F C N L
L P C: T
N C N L
L C C T
Page i 5
i i 8..:, ,' ,., 00
'! i i. :~8 0
O, 000
! 712, 000 O, 000
O, 000
O, 000
!ii,030
8,970
0, 000
i , 06 0
27 80n
":' 502
i , 000
- 99'3,250
i . 000
0.000
0,000
0, O00
0 000
i i,,.7 500
ii0,910
32,"::';I , 000
4870, OOO
.883
2,660
i 2i. 600
iii ,270
9, i 60
i, 0i 0
.32,82 0
'" 5'36
· 2,324
ii8
.... ,, -.~
0 .~, ..;;,
i O:?, 300
922,000
22 i , 1 00
i 762, 000
1 1637,500
t I O. 'y,"u
14015,000
4572, 000
i ,385
2,590
32,700
iii,~60
i 9,27'Z4
8,640
i, 0:..~ 0
28,930
'2,332
0495 · 4 i 8
2, 078
, 009
i9'~5c, 574
i4i ,600
i S; ~; 9, 000
~ .... 500'
3028, 000
t t ~347
i 1i, t'30
17044,, 000
,4670, 000
, t, lKo
2, i 20
I 8,500
Iii ,500
.c.., .
..s ~,; 0
i . 040
29,53!3
2,i92
I ..5848,92 0
2, i 7"9.
.026
24i54,586
1.34, i 00
225R. 000
""-' .~; ~ 500
· '~ 8 S 5,000
it4~7
iii,240
--z,o 0
i4. b._,~, O0
4533,000
i,96i
i,8i0
2'2,300
t!i,6i0
24,7'27
8 , 770
t , 080
28.7i0
2,24.'2
i 4825. i 82
2, 094
, 028
'i 037 7'"'
i :'-"; 0.000
223'i . 00.0
;300,000
3502. 000
i i337,500
ii0 :¢0
i~,''A ,
... ~= 8 000
,
'4 ~:,4 0 000
i ,2a3
2,i2o
6i.200
ii!,540
i6,424
8,850
i, 060
24,820
2 ~ 79
,, ,,.,.~
89i2,506
i , 884
,020
9 06
i62,500
i 4~'~ 000
295, 000
'--'4~:,5 000
,=:. ..... 500
i!0,920
i 5065,000
4372. 000
i ,706
2, 000
i9,100
t i i ,5:$0
24 i 8;2
8,660
i .~.s 0
'2i , 9?0
2,25i
i ._'g899,527
i, ;-'*;"'8
18c' 300
i 974,000
328,800
S446,008
i I i37,500
ii0,950
i 4897,000
4416, OOO 1 , :378
1 ,770
._,_ ,o00
ili .590
24
8,61 C
i, 040
i9. i60
2,248
i 2676 , 506
i . .'z, '~ .5'
-, 002
19860,9i8
263. 300
2ii5,000
11037,500
!!0,870
.~bo~,O00
4450,000
i,648
'2.070
3i,800
i!i,680
21.333
o 9i¢!
i . 02 0
'22, 04 0
2. 298
! 2359,46 9
I , 7'30
,0i9
· 2i 037'. 78i
i 77, ~00
i 825,000
3,.. ,_,q ':', ,...::',. fi_ fi.
3638. 000
TA
i}EP'ir. TENS ~]R CAL. I P. HOB
L S [:, F' C U P E S S D P ~,~ U A L F- S L D
¢~CCT PEF DPH ."( NPH i NRAT
DRHO
N S L D
F' C' H L
L PC T
i'4 C H L
L. C: C: T
i :S
'!0937,580 44.45, 000 54,408 8,990 '2,2!4
~.i0,730 "2, i25 ~ti ,~70 'i ,090 !3835,650
i673:3, 000 2,i60 26,424 28,000 2, 097
i, ~., ,,, ,,, 00 48 ~.- 6 ,000 t i t , 6_, 00 '9.. ,o~: '~' "" 0 ;;7'., 2 F
i i 0. 430 2 , 427 'i I i , 070 t , 000 i°'~':' -":¢'~....,,-.~.., , i29._.
........ Z. 2 . ' .-..=; ~.z~ , - . ....
2 0 ~_'_456 00 O ;~ ~'~. O '~' '--' 4 o .... _,. 0 'i ,0 ._~ i ~
, 075
'22i 30,9i 0
, i78
27:989,809
J33 ,SO0
'" ": "' '"~ O 00
5'2,200
26= - _
;262 , '200
4260, 000
150,000
62S4. 000
Ma::.::irr~um l~ngth: i 024
T R A Z'"'* '"
LER KECORD:~.
Fil~= t.!:,p~: L.O
Fiie name: C4GSFOi , C~03
Haximum tength; I024
H E A D E R
R E C O, R D 'q,_
D a"o e ~
Fiia t.l:..'pe; LO
P.,,'--,~:v:fous {'i ie::
M N E !"!
CN
WH
FN
CO U H
STAT
CTRY
SECT
T 0 (d hi
RAN(]
EK8
EDF
EGL.
PD
LHF
DhiF
RUH
LCC
SON
LUH
FL
LUL
EN~i
WITN
DD
DL
TLi
E,'Li
TCS
TLA8
8HT
NR T
MT
hi S S
HviS
RN
RHF
H F S T
biFSS
RMC
MCST
MCSS
"HF ON RE ORL:,S
o. R H A T i: r'
C 0 H T E H T S
S'TANDRRD ALASKA PRODUC;TiON CO
i<-i4 O/'H APi HUH: 50-.029-2i752 ................
PRUDHOE BAY [:,RTE OF JOE:: 09-26-87
HORTH SLOPE . , .....................
A L A S i< A
US A ................. ...................
5~, 2 0 0 .................................................. F T
2 4,3 0 0 .................................................. F T
S~36
¢' 64 , : ~ : , , , : : : : , : : , , , : , : : , , , , : ~ , ....
76 i 2
NORTH SLOPE ...................
NORTH SLOPE
ROEDER
E:UNN ~ H6H~H
~ ~800, 000 ............................................... FT
i i8i4.000 ............................................... FT
~ 000~, 000 ............................................... FT
! i8~ O, 00~ ............................................... FT
22,300 .................................................. HR
9.5 00 ...................................................
-:'R a00 oEGF
DSP SOLTEX ..... ,
~8, O00 .................................................. CP
I , 5 ~ O ................................................... OHHH
~ , 37 0 ................................................... OHMM
ME~S
2: 56 O ................................................... OHHH
75. z u v .................................................. DE6F
MEAS
C A T &"
S .i Z E 3:3 0 E
Pa9 e
H N E H S E R ',/I C: E U N I T t'1 i,i E H ::.: E R ? .i C: EU f.l i T
D E P T Fi F E E T [:' E F' T F T
TEN4 t ] ~ ~-.: J~_ LBS TEi'.tS FtERGE LBS
GR,4 biERGE GAP i GR f'iERGE GAF' i
2 0
[) A T A
E i'-i T R Y
Fi]RMA
T ePEF: i F ~ Cfi
T Y P E S ! Z E C O[)F
0 i 6 E.
T I OHS
2'!
: F'E [:,ESCR iPT i Of,i
0 Ter.~inato~ .... :.' no mor. e enf:.r'ies )
£)ATA
SERf'/ICE SERV!C:E
MNE!'i ID ORDER ~
AP]; APl AF'i APl FiLE
UNiT LOG TYPE CLASS MO[:~ ii
[:, E P T'
TEl,IS MERGE
GR MERGE
PRC ~
SiXE LVL SMPL
4 0 i 68
4 0 i 68
PROCESS iPJDiCATORS
000000 000000 000000
000000 000000 000000
i 08.'~9.. . ~.,nO0 3996 000
78 . 400
10779, OOO 3996 000
5 6,5 0 O
· ., ," , 000
104, .,
() 0 O 7_4938
0 08 53,200
000 6!,900
10379 000 3864 OOO
6 0, 00 0
t 027' 9 000 ..-~ ~_ ~:.'-' t 000
4i,600
t ri. i 79 00 O ,.:~-'/6, ':",_ fl. 0 O
4.5,900
10079 000 3728 OOO
55..500
Fila name: ~<GSFOi ,
Ma::..'. i mu~ i e:ngth: i 024
Fi ie: t'.?'l::,e: L,O
MICROFILMED
A~ASKA COMPUTING CENTER
CORPANY NAME
WEbb NAME
rIEbO NAME
BOROUGH
STATE _ _
AP/ NUMBER
REFERENCE NO
BP .EXPbORATION
A A~8:A
50~-~9-21752
73751
IS Ta ep Verification Listing
~chlum~erger A1 asea Computing.. Cent er
19',,MAR-1990 20:31
PAGE:
SERVICE NAME : EDIT
DATE : 90/03/19
ORIGIN FLOC
REEL NAME ~ 73751
CONTINUATION # : -
PREVIOUS REEL :
COMMENT I BP EXPLORATION, PRUDHOE BAY~ K-14, APl #50-029-21752
**** TAPE'HEADER ****
SERVICE NAME : EDIT
DATE : 90/03/19
ORIGIN ~ : FLIC
TAPE NANE : 73751
CgNTINUATION # I !
PREVIOUS TAPE :
CO~ENT : BP ExpLORATION, PRUDHOE BAY, K-14, RPI #50-029-2!~52
FILE NAME : EDIT ,001
SERVICE : FLIC
VERSION : 001A04
DATE : 90/03/19
MAX AEC SIZE : 1024
rILE TYPE I LO
LAST FILE :
SCHLUMBERGER WELL SERVICES **
COMPANY NAMEI BP EXPLORATION
WELLI K-14
FIELD: PRUDHOE BAY
BOROUGHI NORTH SLOPE
8TATEI ALASKA
API NUMBER: 50'029-21752
LOCATXONI 1909' FNL & 4106' WEL
SECTIONI 4 TONNSHIP~ llN
PERMANENT DATUMt MSL ELEVATION: 0
RANGE: 14E
chlum er~er' leslce Com. Utln~ Center
LOG MEASURED FROM KB 53,2 ABOVE PERMANENT DATUM
ELEVATIONS KB: 53,2 DF.* 52,2 GL~ 24.3
DATE LOGGED{ 12"MAR-90
RUN NUMBER:
TD LOGGER.* 11749
CASING i.* 9 5/8" 47 LB @ DRILLER DEPTH OF 0 TO 10827
C~SING 2= 7" 26 LB 8 DRILLER DEPTH OF 1.0567 TO 11800
TUBING= 4 $/2" $2,6 L.B 9 DRILLER DEPTH OF 0 'TO $062
TAILPIPE~ 4 1/2"
BIT SIZE = 12 ~5"
bOGGING DISTRICT.*
LOGGING, ENGINEER=
WITNESS I
TIME LOGGER ON BOTTOM= 11:30 12-MAR
46 ! 5
JOHNSON/$ARBER/RATHERT
TEEL
TOoL NUMBERS{
CNC,,DA-146
CAL,,UB,,276
ATM,,AR'3 4
FIELD
REMARK~iEDR' INTO CBT 10/30/87. 1'5' SHALLOW TO BHC BELOW 11625'.
WELL SHUT'iN AT $0..58 3/12~90, ' '
GAS IN NELLBORE ON FIRSTuPA&$. _ . .
PUMPED IN 18i BBL$., PROD¥CED ~ATER & 50 BBL$,' METHANOL,
STARTED LOGGING AGAIN e _9~0!,_1 .,
APPARENT GOC' $I$456'. NOTE INCREASED GR 10996,- 15627 &
15636' - !1554'. THIS IS AN INDICATION OF WATER PRODUCTION
SCALE DEPOSIT,
DATE JOB STARTED= 19-MAR-90
JOB REFERENCE NOI 73751
LDP/ANAt KOHRING
'PAGEI
FILE - EDIT,O01
BP EXPLORATION
PRUDHOE BAY
* K'14
* API #50'029'21752
TaPe reFit!cation Listing
;chlum,ergerb Aiaslca ¢omputln~ Center
19-MAR-Iggo.20~31
DATA SAMPLED EVERY-.5000 FEET
DATA INCLUDED
TOOL EXTENSION TOOL
TYPE USED NAME
CNT-A/D/H ..PS1 COMPENSATED NEUTRON 11745' TO I07
CNT-A/D/H ~'PS2 COMPENSRTE~ ~EUT~ON li74'5'~ TOTO ~07~:~.
. 45' TO
PA. GEI 3
TABLE TYPE I CONS
TUN.I
WN K 4
APIN ~$0-029 I752
FL ~909' ~L & 4106'
SECT
TOwN
RANG
COUN NORTH. SLOPE
STAT ALASKA
NATI USA
W/TN TEEL
:SON 381377
PDAT MSb
APD FI 53,2
EKB FT 5
EDF FT 5~'2
EGL FT
BbI FT 1 ,
-TLX FT l~800,
TLAB 11130 12=MAR
VALU DEF'! · ..
ComPany.Name
Field Name
Well Name
AP1 Sari. al Number
rleld Location
'seetlon
Township
Rang9
County
Sta~e or'Province
Nation
witness' Name
Service Order Number
Permanent datum
bog Measured From
ottom Log Interval
op boq'Interval .
Time Logger At Bottom
I~$ ?a~e verification bistSng
chium erger Alaska Computlng center
1g-MAR-1990 20:31
TABLE TYPF,., = CURV
DEFI
DEPT Depth Channel,~Name
NPHI Neutron Porosity
NPH! Neutron Porosity
TNRA Caiibrated Thermal Neutron Ratio
RCNT RCNT
RCFT RCFT
CNTC CNTC
CFTC .CFTC
GR Gamma 'Ray
TENS Tension
CCbNp.! .Neutron¢Cb AmPlitude
rosl,t~v i Neut Ratio
TNRA Callbrat~J Ther a ton
RCNT RCNT
RCFT RCFT
CNTC ·
~[TC CNTC
.CFTC
Gamma Ray
TENS Tension
CCh CCh Amplitude.
NPH! Neutron Porosity
TNRA Callbrated Thermal Neutron Ratio
RCNT RCNT
RCFT RCFT
CNTC
~TC CNTC
CFTC
Gamma Ray
TEN8 Tension
CCh CCh A:mplitude
NPH! Neutron Poroslty
TNRA :CaIlbrated Thermal Neutron Ratio
RCNT RCNT
RCFT RCFT
CNTC CNTC
CFTC CFTC
GR Gamma Ray
TENS Tension .
CCh CCh AmplitUde
PAGEl
DATA FORMAT SPECIFICAT!.ON RECORD
** SET TYPE - 64EB **
TYPE REPR CODE VAbUE
1 66 0
2 66 0
IS ~Tape Vert~lcatlon Llstincj :1g-MAR-1990 20~31
Chlumberger AlasKa Computing Center
TYPE REPR CODE VALUE
3 73 I52
4 66
5 66
6 73
7 65
9 65
13 66 0
14 65 F~
15 66 68
16 66
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE APl APl API APl FILE NUMB NUMB SIZE REPR PROCE$8
ID ORDER # LOG TYPE CLASS 'MOD NUMB SAMP EbEM CODE (HEX)
.
DEPT FT 38! 77
.P.! .LA PU 38! 77
NP.I PS1 PU 381377
TN'RA PS, 381377
RCNT P$1 CPS ~37
RCFT PSl CP~ ~o,371
CNTC PS1 CPS 381377
c Tc Ps1 cps 38 377
1377
T.NS PSt LB 38,377
CCL P81 V 381377
.PHI PS2 PU 381377
TNRA P82 38!3 77
.C.T cps
GR P$2 GAPI '38!377
TENS PS2 LB, 381377
CCL P82 V 381377
NPH! PS3 PU 381377
TNRA PS3 38!]~7
RCNT PS3 CPS 381 7
RCFT PS3 CPS 381377
CNTC PS3 CPS 381377
CFTC PS3 CPS 381377
GR PS3 GAPI 381377
TENS PS3 LB 381377
CCL PS3 V 381377
.P.1 PS4 PU 381377
TNRA PS4 381377
O0 000 O0 0 1
O0 000 O0 0 1i I 4
42 890 O0 0 1 I1 4
42 420 01 0
42 4~ 0 O1 0
42 4 0 01 0 1 1 1 4
42 420 O! 0
4
1
42 150 01 0 I ! 1 4
42 890 O0 0 I 1 I 4
420 Ol 0 4
42 1 1 1
42 410 01 0 1 I 1 4
42 4' 0 O1 :0 I I 1 4
42 4 0 01 0 I I 1 4
42 420 O! 0 I 1 1 4
42 310 01 0 1 1 I 4
42 6 0
'iIlo o,o
I
4
4 0 Ol 0 . ,
! 4
42 420 O1 O- 1 1 I 4
42 420 01 0 I 1 1 4
42 310 O1 0 1 I 1 4
42 635 21 0 1 1 I 4
42 150 Ol 0 1 , 1 4
42 890 O0 0 I 1 ! 4
42 420 01 0 1 I I 4
68 0000000000
68 0000000'0.00
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 O0 0
68 0000000'0~
68 00000000
68 0000000000
68 0000000000
68 ~0000000000
68 0000000000
68 0000000000
68 0000000000
68 000.0000000
68 0000000000
68 0000000000
68 0000000000
68 0 O0
ogg°°
oooooooooo
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
TaPe verification Listing
chlumberqer AlasKa ComPuting Center
19,,,MAR.,1990 20{31
:6
NAME SE'RV UNIT SERVICE APl APl APl API Fib NUMB NUMB SIZE REPR PROCESS
UM~ CUEX)
N
CODE
EbEM
ID ORDER # bOG TYPE CbASS MOD SAMP
DATA
DEPT
RCNT PSi
CFTC PS2
NPHI
CNTC PS)
CCL PS3
RCFT PS.4
-TENS PS4
DEPT
RCNT PSi
GR PSi
TNRA PS2
CFTC PS2
NPHI
CNTC PS3
COL PS3
RCFT PS4
TENS PS4
DEPT
RCNT PSi
GR
TNRA PS2
CFTCPS2
NPHI PS3
CNTC
CCb~P$3
RCFT P$4
TEN8 PS4
DEPT,
RCNT.PSI
a ;eSl
TNRR,P82
CFTC,P$2
NPMI,PS3
ooo
9 250
-999 250
-999 250
-999 250
-999 250
-999 250
-999 250
11700 000
2110
59 i38
663 431
62~ 000
1220 000
11600 000
2216 450
28 547
4 369
623 836
29 772
2755 063
0 O00
508 475
1t70 000
500,000
11859 29
5,149
639,260
27,724
NPN! HLA
RCFT PSi
TENS PSI
RCNT PS2
GR P$2
TNRA PS3
CFTC PS3
NPHt P84
CNTC PS4
CCh P84
NPHI HLA
RCFT PSI
TENS PS
RCNT
GR PS2
TNRA PS3
CFTC PS3
NPH! PS4
CNTC PS4
CCh PS4
NPHI NbA
RCFT PSl
TENS PS
RCNT
GR
TNRA PS
CFTC P$3
NPHI PS4
CNTC PS4
CCL PS4
NPHI HbA
RCFT
TENS PS1
RCNT P82
GR PS2
TNRA PS3
2 g
"999 00
'999
'999 9.50
'99 50
'"999 150
-999 50
'999 250
467 2
1250 0
2825 i32
45 )63
0 000
4~7 4~0
000
O94
5 016
2925 702
0 000
,176
30;00o
NPNI
CNTC PS1
COb PSI
RCFT PS2
TENS PS
RCNT PS]
GR PS3
TNRR PS4
CFTC PS4
NPHI
CNTC,.PS1
CCh PS
TENS PS2
TNRA PS4
CFTC P$4
NPHI,PS1
CNTC,PS1
CCh,PSi
RCr?,P$
TENS.PS2
RCNT;PS
GR.,PS
TNRA,P84
CFTCeP84
NPHt,PS1
CNTC,P$1
CCh,PSi
RCFT,PS2
TENS,PS2
RCNT,PS3
-999
999
,,999
250 TNER
250 CFTC
2 0
,2~0 NPHI
CNTC
999~ CCL
-9~9 50 RCFT
-9 §=250 TENS
-999 250 RCNT
-999 250 GR
PiS
PS2
0
658
1240
1982
674
962 TNRA
· 505 CFTC
000 NPH!
009 CNTC
000 CCL
GE
PS
P82
r,l.l
PS4
PS4
0
566
3 ~NRA PS
1 CFTC PSi
0 NPHI P$2
7 CNTC-PS2
000 CCh PS2
339 RCFT,PS3
469 TEN PS4
639 RCN~rps3
206 GR PS4
29,504 TNRA,PS1
3198,999 CFTC,PS1
0,000 NPHI,PS2
584,071 CNTC.,P82
1200,000 CCh,PS2
2859,729 RCFT,PS3
.' 9,250
9,,2,50
"-999,'250
:'~999.}250
~9994~250
:-999.,250
~-999250
4'.283
562,724
~22;~018
3019;'770
:0.000
470;588
.1205,000
2320,346
47,,063
000
see
1.205 000
4,984
635,328
~30,869
3269,$10
0,000
65i,594
chlum.erger'Alas~a Comput t
CCL.,PS3
D£PT
RCNT PSi
THRA PS2
CFTC PS2
NPH!
CNTC
:CCL PS3
RCFT
TENS PS4
DEPT
RCNTPS1
TN~
PS2
CFTC
NPH! 'PS3
CNTC P83
CCLPS3
RCFT PS4
DEPT.
RCNT. PSl
.TNRA
CFTC
NPHI~I3
C~TCi
TENS PS4
DEpT
RCNT PSI
GR PS
TNRA PSi
CFTC PS2
NPHIrPS3
CNTC PS3
RCFT PS4
TENS PS4
DEPT
RCNT PSi
GR PS1
TNRA PS2
CFTC PS2
NPH! PS3
:3238,580
ooo
6 :766
11 0,000
11400 000
3837 i04
t180 446
19 237
4389 3t3
O 000
1108 225
1155000
300 000
868 10!
23 210
0 000
817 021
1155 000
11200 000
4444 444
11547
918
171 861
5It
. 000
1582 609
1145 000
lllO0 000
5631 067
13 078
2 475
2569 529
271
0 000
2347 826
1150 000
11000,000
39~1,!65
1,750
3,567
1229,633
18,499
NPH~,PS4
CNTC,PS4
COb,PS4
NPHI'HSA
RCFT~PS1
TENS;pSi
RCNT;.'PS2
GR;PS2
TNRA,PS3
CFTC,PS3
NP,HZ,PS4
CNTC,DS4
CCh,PS4
NPHI,HLA
RCFT,PSI
TENS,PSi
RCNT'PS2
GR,P$2
TNRA~PS3
CFTC~PS3
NPHIPS4
CNTCPS4
CCL PS4
NPHI.,HLA
RCFT,P81.
TENS,PSi
RCNT,P$2
GR,PS2
TNRA,P$
CFTC.,P$~
N~RI,PS4
CNTC,PS4
CCL,PS4
RCFT. P$1
TENS, psiPS
RCNT,
GR:ps~Ps
TNRA
CFTC. PS3
NPH! P$4
CNTC PS4
CCh PS4
NPHI.HhA
RCFT,PS1
TENS, PS1
RCNT~PS2
GR,P$2
TNRA,P$3
, 8 :TN{~A,PS4
Oo 0
·19
i I94
i .i 90
· 3914
· I0
4389
0
3 NPHI,P:S!
CNTC,PSl
RCFT,PS2
5
RCNT,PS3
~ TENS,PS2
:GR'·PS3
'TNRA'PS4
~0
.23.828
~ 190,0 ~ 0 R~::~
3268;:0:5
13,305
4,184 RCNT
8§6,4,~2 :'GR
24,45 ;TNRA
3910,982 CFTC
0,000
.13,.9~5 N'PHI
:!5~0,000 CNTC
:11,594
5148',504 CFTC
0,000
238
9
252~
10
6298
0
596
889 CNTC
000
,t30
734 TENS
542 RCST
496 TNI~
446
980 CFTC
000
18,t64
11.75,355
!195,000
3860,870
20,906
3,551
PSI
PSi
PS
P.83
PS4
PS I.
P83
PS3
PS4
:PlS
,PSi
PS
,PSi
PS2
PS3
PS3
PS4
PS4
NPH! PS1
CNTC PS1
COb
RCFT PS2
TENS PS2
RCNT PS3
13'320 TENS'PS3
5'044 RCNT,PS4
648,865 GE,PS4
43~!,264 TN.A'P$
,079 CFTC P:~l
:: ,000 NPHI '.PS2
1066,667 CNTC PS2
1225,000 CC~P$2
3909'502 RCFT;PS3
,953 TENS;~PS3
I'],596 RCNT;PS4
1209,697 OR;,PS4
,26,395 TNRA PS1
3636,942 CFTC PSi
:0,:000 NPHI: PS2
8t4;259 CNTC.PS2
1~70'000 CCb;,PS2
12,016 TENS,PS3
4,352 RCN:T;'P$4
85:8,402 GR,P$4
1.4,231 TNRA,'.PSl
5003,i82 CF'TC,PS1
1558;44! CNTC,PS2
1190,000 CCL,PS2
':2,947 RCNT,P84
1726,299 GR"P$4
· 9.g43 'TNRA~PSl
6372,616 CFTC,PS1
0,000 NPHZ,'P82
2389'380 CNTC,PS2
Ii70,000 CCL.P.S2
5 29'629 RCF~;PS$
16.125 TENS,PS3
· 2.454 RCNT,P$4
2582.690 GR.PS4
16 747
4349 858
0 000
115 044
145 000
3851 852
TNRA,-PSI
CFTC,PSl
NPHI,PS2
CNTC'PS2
CCL.PS2
RCFT.PS3
.1570,000
'2921.,739
i4'914
4407 066
~:i 30 ::0~0
:3880 8 t
788.;22.4
:0,000
796'296'
.1160;000
3473,340
.t7,875
0 000
240 ~00
.!328,~02
.18,6i8
434~,657
0,000
1158,371
19~r~AR..,t990 20=3.1
C~T¢,PS3
CCh,PS3
ReFT,PS4
TENS,PS4
DEPT
TNR~ PS2
CFTC PS2
NPH!
CNTC PS3
CCL PS 3
RCF? PS 4
TENS P$4
C T. PS
GR PS1
?NRAPS2
CFTC P$2
NPH! P$3
CNT~ PS3
CC~ P$3
RCFT P$4
:TENS P$4
DEpT
ReNT
GR PSI
TNRA
CFTC PS2
NPH! PS3
CNTC P$3
CC~ PS3
RCF? P$4
TEN8 PS4
4374,437 CFTC,PS3
0,000 NPHI, PS4
40,426 CNTC,P$4
~ 50,000 CCh,PS4
lOgO0 000
3533.980
37 219
3 7O2
1047 864
18 828
3757 348
0 000
904 348
1110 000
10800000
1902 9113
265 6
60 311
1g1~1449000
250000
· ti30000
10796,000
'ggg,250
'999,250
'999'250
'g99'250
-999 250
-g99 250
-999 250
'999 250
'99g 250
RCFT Si
TENS,PS!
RCNT PS2
T~RA
CFTC
NPHI P$4
CNTC PS4
CC5 PS4
NPHI HLA
RCFT PSi
TENS PSi
RCNT P$2
GRPSpsI
TNRA
CFTC PS3
NPH! PS4
CNTCPS4
CCb,:PS4
NPHI:HbA
RCFTP$1
TENS PS1
RCNT PS
GR
TNRA.'P$3
CF?C,P83.
NPHI,PS4
CNTC;P$4
CCh'PS4
.ig 629
985 782
!190 000
" 78!
~20 log
396~
0 000
52 295
270531
.1160000
1777.:778
:0,000
ggg;250
'gg9,250
-999,250
~999,250
'999,250
~999.250
NPH!
CNTC PSi
CCLP$i
RCFT~P$2
TENS PS2
RCNT PS3
GRIPS3
TNRA PS4
CFTC PS4
NPH! PS1
CNTC PSi
CCh
RCF~ P$2
TENS P$2
RCN? PS
OR
:TNRA PS4
CFTC PS4
NPBI, PSl
CNTC PSi
RCFT
:TENS. PS2
RCNT PS3
Ga PS3
TNRA P84
CFTC P$4
** END OF DATA **
,470 RCNT,~PS4
1:284':247
19,807 TNRA,PSI
3944,724 CFTC,PSi
'0,000 NPHI',P$2
1 942,.22~ .CNTC,PS2
150,000 CCh. PS2
333'333 RCFT:~P$$
40'625 TENS,PS3
3,778 RCNT,P$.4
I039,260 GR,PS4
49,085 TNR. A:
211g,258 CFTC.
0,000 NPHt
250,089 CNTC
pS¸
PS2
PS2
,Ps 3
~P84
t 50; ooo
666,667
45,438 'TENS
7,614 RCNT
:252,801 GR PS4
'ggg.250
'-ggg.250
999,25
-999,250
-999,250
:g99,250
~999,250
999,250
TNRA,P$1
CFTC,PS1
NPHI.,.PS2
CNTC.P$2
CCh,PS2
RCFT,'PS3
RCNTeP84
GR,P$4
PAGEI
tiio'ooo
: 3
~i:9'618
~37. g4,539
0,000
,925,926
1145,'000
335g,307
42'313
295.;.:251
~5~,793
i950,994
:0,000
222,222
llIS,000
4~,t:25
:'ggg,250
'ggg,250
:-ggg;i50
:'~999,250
ggg*250
,-,,,
'999:
**** FILE TRAILER ****
FILE NAME = EDIT ',001
SERVICE = FLIC
VERSION = 001A04
DATE I 90/03/19
MAX REC SIZE I 1024
FILE TYPE I LO
LAST FILE =
:Tape Veriiication Listing
;chlomDergerAlask8 Computing Center
!9-~AR-1990 20:31
**** TAPB TRAILER ****
SERVICE NAME i EDIT
DATE I 90/03/19
ORIGIN ~ FL!C
TAPE NA!~E ~ ~!
CONTINUATION ~ : 1
~ EVIOU~ TAPE ~
COMMENT I BP EXPbORATION~ PRUDHOE BAY, K-~4, API '~50-029-21752
**** REEL TRA!LER *~**
'SERVICE NAME :: EDIT
DATE I 90/03/19
ORIGIN I FLiC
REEL NA~E I 73751
CONTINUATION # I
PREV!OU& REEb g
COMMENT I BP EXPbORATION, PRUDHOE BAY, K-14, APl #50-029-21752
9