Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout213-062 21 3062
Seth Nolan Hilcorp Alaska, L 2 8 7 8
GeoTech 3800 Centerpoint Drive, Suite 100
Anchorage, AK 99503
RECEIVED Tele: 907 777-8308
fGlmrh al,tskn.LTA, Fax: 907 777-8510
E-mail: snolan@hilcorp.com
NOV 1 3 2017
DATE 11/10/17 AOGCC DATA LOGGED
1t/14/2011
Vl K BENDER
To: Alaska Oil & Gas Conservation Commission
Makana Bender
Natural Resource Technician II
333 W 7th Ave Ste 100
Anchorage, AK
99501
DATA TRANSMITTAL
SCU 12B-09 scoNED FEB 0 12018
Perforation record prints and digital data
Prints:
Perforation Record Log
CD1: Elog digital data
j SCU_12B-09 PERF_15SEPT17 LAS.zip 10/20/2017 9:15 AM Compressed(zippe... 119 KB
1- SCU_12B-09 PERF_15SEPT17.pdf 10/4/2017 3:26 PM Adobe Acrobat Doc... 546 KB
SCU_12B-09 PERF_15SEPT17 img.tif 10/20/2017 9:14 AM TIF File 3,970 KB
Please include current contact information if different from above.
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8337
Received By:
Date:
KECEIVED
STATE OF ALASKA
ALA.OIL AND GAS CONSERVATION COMM ON OCT 1 1 2011
•
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Abandon U Plug Perforations U Fracture Stimulate U Pull Tubing U AQeGoOCdown U
Performed: Suspend ❑ Perforate ❑✓ Other Stimulate ❑ Alter Casing El Change Approved Program ❑
Plug for Redrill El srforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑
2;Operator 4.Well Class Before Work: 5.Permit to Drill Number:
Name: Hilcorp Alaska,LLC
Development Q Exploratory ❑ 213-062
3.Address: 3800 Centerpoint Dr,Suite 1400 Anchorage, Stratigraphic Service ❑ 6.API Number:
AK 99503 50-13-10126-02
7.Property Designation(Lease Number): 8.Well Name and Number:
A028997 Soldotna Creek Unit(SCU)12B-09
9.Logs(Listlogs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):
N/A Swanson River Field/Hemlock Oil
11.Present Well Condition Summary:
Total Depth measured 11,412 feet Plugs measured 10,433 feet
true vertical 10,535 feet Junk measured N/A feet
Effective Depth measured 10,433 feet Packer measured 9,491 feet
true vertical 10,274 feet true vertical 9,484 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 32' 20" 32' 32'
Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi
Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi
Production
Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi
Perforation depth Measured depth See Attached Schematic
True Vertical depth See Attached Schematic
Tubing(size,grade,measured and true vertical depth) 3-1/2" 9.3#/L-80 9,567'MD 9,560'TVD
DHL Hydraulic Pkr 9,491'MD 9,484'TVD
Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A
12.Stimulation or cement squeeze summary: N/A
Intervals treated(measured): N/A
SCANNED :LAN 1 2 2.0
Treatment descriptions including volumes used and final pressure: N/A
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 5 3 2 595 200
Subsequent to operation: 81 21 5 720 150
14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations ❑i Exploratory❑ Development❑✓ Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas 0 WDSPL❑
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
317-426
Authorized Name: Chad Helgeson 777-8405 Contact Name: Ted Kramer
Authorized Title: �Ope�rations Manager Contact Email: tkramerehilcorp.com
Authorized Signature: � !"L�i� /-' Date: I dif o 1) 7 Contact Phone: 777-8420
Form 10-404 Revised 4/2017 Submit Original Only
,a «�s-.7 RBDITS V/ but 1 2 2017
• •
Hilcorp Alaska, LLC
Well Operations Summary
Well Name Rig API Number Well Permit Number Start Date End Date
SCU 12B-09 E-Line 50-133-10126-02 213-062 9/14/17 9/15/17
Daily Operations:
09/14/2017 -Thursday
Arrive at PWL shop pickup crew and tools drive to Swanson River. Permit to work. Hold JSA and discuss job procedure. Rig
up. PT lubricator and WLV 250/2500 psi. Shut in flow line. RIH/w 2.75" Gauge ring to 740' KB. Work tools to 765' KB not
falling. Potential paraffin in hole. POOH. At surface.Tools covered in paraffin. RIH/w 3" slickline scratchers to 765' KB work
tools to 975' KB stopped making hole. POOH. Seen over pull while Tripping out. Lay down Lubricator. Wire was blown up the
hole. Wire wrapped from rope socket to slickline scratcher on Bottom. Cut line and tie new rope socket add 5' of stem. RIH/w
3" slickline scratcher to 975' KB work tools to 1060' KB diesel arrived on location. Start pumping diesel with field triplex
pump. Fall through at 1198' KB continue to 2500' KB did not see any more paraffin. POOH to surface. RIH/w 2.75" Gauge ring
to 754' KB work tools to 778' KB. POOH. RIH/w 3.5" paraffin cutter to 752' KB work tools to 1228' KB while pumping diesel
with field triplex. Cut paraffin to 1472' KB. See light pockets at 1756' KB, 2148' KB, and 2457' KB continue to 2500' KB. POOH
to 800' make 3 passes to 2500' KB. POOH. Break out 5' of stem. Make up 2.5"x20' dummy guns. RIH with dummy guns to
10,384' KB set down. POOH.Tagged up at surface. Close master and swab valve. Rig down SL unit and park equipment at P&S
yard. Close out work permit. Location secure. Pollard crews off location. Night production operator shut in well to build
pressure to 800 psi. Pumped 150 gallons of diesel for paraffin cutting.
09/15/2017 - Friday
HES crew arrive at office. Permit to work. Hold safety meeting. Discuss job procedure. HES spot in equipment. SITP from
previous night was 769 psi. Stab on well to PT lubricator 250/3000 psi for 10 minutes. Bleed down pop off well. BHA, RS,
Gamma/CCL, firing head, 2.5"x10' HC charges, 6 spf. Halliburton engineer having troubles with communication between BHA
and acquisition software. Problem was thought to be fixed. RIH @ 9000' lost acquisition with Gamma/CCL again. Called shop
to get another set of tools dispatched. POOH to surface. Wait for new Gamma/CCI to arrive. NOTE: HES did not have 20'
carriers. Have to use 2x 10' guns. New Gamma/CCL on location. Make up 1st gun run. 2.5"x10' HC connex loaded 6 spf. Stab
on well. RIH log strip from 10,235' to 10,100'. Did 3 repeats. Hard to see good signature between logs. Send 3x log passes to
town. Used tie in log from Geologist titled 12B-09 Tie in Log. Log confirmed on depth.Top Shot to CCL 10.7'. PU to 10,169.3'
Shoot 10,180'-10,190' Current WHP prior to shooting 769 psi on crystal gauge. 25 minutes after shots fired WHP 829 psi and
slowly rising. POOH. At surface. Close swab. Pop off well. All shots confirmed fired. Break down spent gun. Make up 2nd gun
run. 2.5"x10' HC connex, 6spf. Stab on well. RIH. Log strip from 10,235'-10,100'. Send correlation log to town. Confirmed on
depth by Geologist. Parked at 10,159.3 ccl depth. CCL to top shot 10.7' Puts top shot at 10,170'-10,180' WHP prior to
shooting. 848 psi. Fire guns. POOH. 15 minutes pressure slowly climbed from 848 psi to 857 psi. At surface. Close swab valve.
SITP 887. Contacted car 13 pad operator.Turned over well to production to start flowing.
Soldotna Creek Unit
• . • Well: SCU 12B-09
ini SCHEMATIC Completion Ran:9/12/13
PTD:213-062
Hikorp Alaska,LLC
API: 50-133-10126-02
Ground Elev: 120'Above MSL
KB-THF:19.0'/KB-GL:18.6'
1L CASING DETAIL
22" 2 Size Type Wt Grade Conn. ID Top Btm
20" Conductor - - - Surf 32'
11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009'
29 N-80 BTC 6.184" Surf 288'
26 N-80 _ BTC 6.276" 288' 1,048'
11-3/4"h7"7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715'
3 '` I 26 N-80 BTC 6.276" 4,715' 6,543'
A 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830'
4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600'
.; 4 ' 1 TUBING DETAIL
3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567'
ill DV Collar @ 6,796'
JEWELRY DETAIL
No. Depth ID OD Item
1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box
6 VD i 2 20' 2.992" 4.470" XO,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin
3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1
7 )111
4 4,996' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#2
5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3
ii
6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4
oi 7 8,844' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#5
8 9,395' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD Orifice#6
1 8 9 9,442' 2.992" 5.313" Chemical Injection Mandrel
10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release)
9k 11 9,534' 2.813" 4.500" X-Nipple
.$ A 12 9,567' 2.992" 4.470" WL Entry Guide
I L I: I 11 13 10,433' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement 04/13/15
10 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
11 X' I
12 . �, Top of Liner
i �� Hanger @ 9,606'
Window @
fe
,, 9,830' PERFORATION DETAIL
°" Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments Date
1 V G1 10,170' 10,190' 10,132' 10,146' 6 20 60 Proposed 9/15/17
91 10,222' 10,242' 10,167' 10,181' 6 20 60 Open 2/24/16
"E / G-
i G-2 G2 10,283' 10,300' 10,205' 10,215' 6 17 60 Open 2/24/16
H-1 10,308' 10,360' 10,219' 10,243' 6 52 60 Open 2/23/16
rye$ H-1 10,374' 10,390' 10,249' 10,256' 6 16 60 Open 4/14/15
13 INN kg! H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated 9/15/13
H-2
H-2
ti:L:ti:1.ti:tii
{ r.r•r.r•r.
9e�`ti.ti.ti•ti.ti.ti
$119ARRin Ta8 @ 10,494'RKBM
4-11/4 r:ti:rtirr
2.25"bailer 12/20/14
srr.y{{2.3:
15 {3
::.::Z .
;:••.:::.:::.:4:::.:.
Shoe @ 10,600'
openhole '
6"hole
PBTD=10,433'MD/10,274'TVD
TD=11,412'MD/10,535'TVD
Max Deviation 78°@ 10,914'
Max Dogleg 16.7°/100'@ 10,053'
Downhole Revised:12/20/14 Updated by DMA 10-04-17
• •
L OF T�
� I%y � THE STATE Alaska Oil and Gas
+� ►�t M ®fLAsKA Conservation Commission
333 West Seventh Avenue
�"t" ' GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572
Main: 907.279.1433
ALAS ' Fax: 907.276.7542
www.aogcc.alaska.gov
Chad Helgeson SCANNED SEP 1 i 2017,
Operations Manager
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Swanson River Field, Hemlock Oil Pool, SCU 12B-09
Permit to Drill Number: 213-062
Sundry Number: 317-426
Dear Mr. Helgeson:
Enclosed is the approved application for sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
41(-41
Cathy P. oerster
Commissioner
DATED this G day of September, 2017.
RBDMS VSEP - 7 2017
• RECEIVED
STATE OF ALASKA EP
52 17,.
ALASKA OIL AND GAS CONSERVATION COMMISSION l
APPLICATION FOR SUNDRY APPROVALS A l
20 MC 25.280
1.Type of Request: Abandon ❑ Plug Perforations❑ Fracture Stimulate 0 Repair Well 0 Operations shutdown 0
Suspend ❑ Perforate Q • Other Stimulate ❑ Pull Tubing ❑ Change Approved Program 0
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑
2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number:
Hilcorp Alaska,LLC Exploratory 0 Development Q 213-062 '
3.Address: 3800 Centerpoint Dr,Suite 1400 Stratigraphic 0 Service ❑ 6.API Number:
Anchorage Alaska 99503 50-133-10126-02-00 '
7.If perforating: 8.Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? CO 123B
Soldotna Creek Unit(SCU)12B-09•
Will planned perforations require a spacing exception? Yes ❑ No 0
9.Property Designation(Lease Number): 10.Field/Pool(s):
A028997 ' Swanson River Field/Hemlock Oil •
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD):
11,412' • 10,535' 10,570' 10,331' 3,380 N/A N/A
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 32' 20" 32' 32'
Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi
Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi
Production
Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi
Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
See Attached Schematic See Attached Schematic 3-1/2" 9.3#,L-80 9,567'
Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft):
DLH Hydraulic Packer;N/A 9,491'MD/9,484'TVD;N/A
12.Attachments: Proposal Summary Q Wellbore schematic Q 13.Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ Stratigraphic❑ Development Q Service ❑
14.Estimated Date for 15.Well Status after proposed work:
Commencing Operations: September 19,2017 OIL Q WINJ 0 WDSPL ❑ Suspended 0
16.Verbal Approval: Date: GAS ❑ WAG 0 GSTOR ❑ SPLUG ❑
Commission Representative: GINJ 0 Op Shutdown ❑ Abandoned 0
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: Chad Helgeson 777-8405 Contact Name: Ted Kramer
Authorized Title: Operations Manager Contact Email: tkramer(a7hilcorp.com
/ Contact Phone: 777-8420
Authorized Signature: Date: ,M7
/i7
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
317- 424p
Plug Integrity 0 BOP Test 0 Mechanical Integrity Test ❑ Location Clearance 0
Other:
Post Initial Injection MIT Req'd? Yes ❑ No i DBDNIS (;7'SEP ` 1 �tt7
Spacing Exception Required? Yes ❑ NoSubsequent Form Required: i t'—y C714-
/� APPROVED BY 13.•-‘
/
Approved by� ��" �� COMMISSIONER THE COMMISSION Date: 7 –4 –7 7
111/t`�� 1
® Rril,GclaNcAtvalid al. j 5 i7
ubmd Form andForm 10-403 Revised 412017 for 12 months from the dat ' f approval. Attachments in Duslic�tm7
• •
Well Prognosis
Well: SCU 12B-09
Ililcorp Alaska,LL Date:9/5/2017
Well Name: SCU 12B-09 API Number: 50-133-10126-02
Current Status: Gaslifted Oil Well Leg: N/A
Estimated Start Date: September 19th, 2017 Rig: E-line -
Reg.Approval Req'd? 403 Date Reg.Approval Rec'vd:
Regulatory Contact: Donna Ambruz 777-8305 Permit to Drill Number: 213-062
First Call Engineer: Ted Kramer (907) 777-8420(0) (985)867-0665 (M)
Second Call Engineer: Chad Helgeson (907) 777-8405 (0) (907) 229-4824(M)
AFE Number:
Current Bottom Hole Pressure: — 1,690 psi @ 10,234' TVD (Based on Survey taken on 2/1/2016.)
Max. Potential Surface Pressure: - 3,380 psi @ 10,152' TVD (Based on 0.433 psi/ft gradient to TVD,
and gas gradient to surface of 0.1 psi/ft)
Brief Well Summary
Soldotna Creek Unit 12B-09 was drilled as a sidetrack of SCU 23A-09 and the liner was run in September 2013. A
gaslift completion was ran in September 2013 with perforations in the Hemlock H-2 bench added thru tubing. April
2015 the reservoir was depleted sufficiently.April 2015,the H-2 was isolated with a thru-tubing plug and the H-1 was
perforated. In 2016 additional perfs were added in the H1 and the Tyonek G sand was perforated.
Objective:
Add new perforations in the Tyonek G-1 zone and increase the oil rate.
Pre-Sundry work to be completed:
- Slickline drift and tag with 2.75"gauge ring to bottom, Brush &flush as needed to get down the well.
- Bail fill with slickline if necessary to clean proposed perf interval.
E-line Procedure:
1. MIRU E-line, PT lubricator to 3,000 psi Hi 250 Low for 10 min.
2. RU 2.5" 6 spf HC wireline guns(6—spf shot density).
3. RIH and perforate the following intervals:
Zone Sands Top (MD) Btm (MD) FT
Tyonek G1 ±10,164' ±10,198' 34
a. Proposed perfs shown on the proposed schematic in red font.
b. Final Perfs tie-in sheet will be provided in the field for exact perf intervals.
c. Pressure up or bleed tubing pressure as needed per Engineer's instructions with gas lift
prior to perforating.
d. Correlate using correlation log. Use Gamma/CCL/to correlate.
e. Install Crystal gauges before perforating. Record tubing pressures before and after each
perforating run.
f. All perforations in table above are located in the Hemlock Oil Pool based Order No. 123A.
4. RD E-line.
5. Turn well over to production.
• •
Well Prognosis
Well: SCU 12B-09
Hilcurp Alaska,LL) Date:9/5/2017
Attachments:
1. Current Schematic
2. Proposed Schematic
11 • • Soldotna Creek Unit
Well: SCU 12B-09
SCHEMATIC Completion Ran:9/12/13
PTD:213-062
Hil vrp Alaska,LLC API: 50-133-10126-02
Ground Elev: 120'Above MSL
KB-THF: 19.0'/KB-GL:18.6'
1
22" 2CASING DETAIL
Size Type Wt Grade Conn. ID Top Btm
20" Conductor - - - Surf 32'
11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009'
29 N-80 BTC 6.184" Surf 288'
26 N-80 BTC 6.276" 288' 1,048'
Li.
G
11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715'
3 26 N-80 BTC 6.276" 4,715' 6,543'
r 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830'
•e 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600'
4 I TUBING DETAIL
r' 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567'
DV Collar @ 6,796'
, 5 AB 'ii
:� JEWELRY DETAIL
No. Depth ID OD Item
1 19' 2.992" Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box
k 6 NIB 1 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin
« 3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1
. 4 4,996' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#2
5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3
., 7 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4
r 7 8,844' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#5
8 9,395' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD Orifice#6
8 9 9,442' 2.992" 5.313" Chemical Injection Mandrel
10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release)
9 11 9,534' 2.813" 4.500" X-Nipple
it 12 9,567' 2.992" 4.470" WL Entry Guide
_ l I, l 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement
10 r - 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
110 11 X
12
Top of Liner
i ' Hanger @ 9,606'
7 1: ;r10
"�
Window @ 9,830'
Tag fill @ 10,368' k 'f PERFORATION DETAIL
w/E-line on ; Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments Date
2/23/16 4 G-2 10,222' 10,242' 10,167' 10,181' 6 20 60 Open 2/24/16
r I( H-1 G2 10,283' • 10,300' 10,205' 10,215' 6 17 60 Open 2/24/16
k n+' " 10,308' • 10,360' 10,219' 10,243' 6 52 60 Open 2/23/16
ti.tixzr`y•4 c
13 0 t.)" H-1 10,374' • 10,390' 10,249' 10,256' 6 16 60 Open 4/14/15
H-2
H-2 10,448' • 10,494' 10,280' 10,300' 6 46 60 Isolated 9/15/13
I. 1.1.1.1.1•
•r•r•r•r•r•'
5.1.1.1.1.
•r•r•r•r•r•
1.1.1.1.1• .4
r•r•r•r•r•
4.1.1.1.1• Ta 10,494'RKBM
4r•r.r•r•r• g @
.1.1.1.1•
r•r•r•r•r•
14 4.1.1.1.1. 2.25"bailer 12/20/14
4?4•{4?4?4?
•
14515151f15•
'
Fl
15 1:1:1:4 :'
4x4x4x4x4x
4-1/2" *4,L.4' ,'L Shoe @ 10,600'
openhole ,,
'c
.,�� ..,, . ,` 6"hole
PBTD=10,570'MD/10,331'ND
TD=11,412'MD/10,535'ND
Max Deviation 78°@ 10,914'
Max Dogleg 16.7°/100'@ 10,053'
Downhole Revised:12/20/14 Updated by DMA 03/23/16
111 0 II
PROPOSED SCHEMATIC Soldotna Creek Unit
Well: SCU 12B-09
Completion Ran:9'12/13
PTD:213-062
Hikor"Alaska.L1,c API: 50-133-10126-02
Ground Elev:120'Above MSL
KB-THF:19.0'/KB-GL:18.6'
22" J
2
2 —+ CASING DETAIL
____;i [LSize Type Wt Grade Conn. ID Top Btm
20" Conductor - - - Surf 32'
11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009'
29 N-80 BTC 6.184" Surf 288'
26 N-80 BTC 6.276" 288' 1,048'
11-3/4"G' 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715'
3 26 N-80 BTC 6.276" 4,715' 6,543'
29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830'
4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600'
4I TUBING DETAIL
3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567'
' DV Collar @ 6,796'
51
JEWELRY DETAIL
No. Depth ID OD Item
1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box
1>I, 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin
e 3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1
4 4,996' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#2
5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3
71-131 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4
7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5
8 9,395' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD Orifice#6
81 9 9,442' 2.992" 5.313" Chemical Injection Mandrel
11)
10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release)
9 I p 11 9,534' 2.813" 4.500" X-Nipple
A12 9,567' 2.992" 4.470" WL Entry Guide
10 31 I 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement
14 10,527' 4.000' 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
11
12 -
Top of Liner
r mit Hanger @ 9,606'
7Fr 1
' I' a Window @ 9,830'
t
PERFORATION DETAIL
14 Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments Date
G-1 G1 ±10,164' ±10,198' ±10,128 ±10,152 6 34 60 Proposed Future
41, r G-2 10,222' 10,242' 10,167' 10,181' 6 20 60 Open 2/24/16
H-1 G2 10,283' 10,300' 10,205' 10,215' 6 17 60 Open 2/24/16
13
10,308' 10,360' 10,219' 10,243' 6 52 60 Open 2/23/16
1 ' H-1 10,374' 10,390' 10,249' 10,256' 6 16 60 Open 4/14/15
H-2
.4,1r:4:1r~r H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated 9/15/13
'1.147,1,•fL;:11.
•11:::::,,V...;
@
r
, • Tag 10,494'RKBM
.•tiL:titiftiti:
14 tiCti.1::r;: 2.25"bailer 12/20/14
3` L 1 IP
B tiff ti•ti•i� �'.
.ftilylyf
15 4,74.165".1,7=7;
,
.."–'7:72* a
`` Shoe @ 10,600'
i ` , 4
openhole "
3 6"hole
PBTD=10,570'MD/10,331'ND
TD=11,412'MD/10,535'ND
Max Deviation 78°@ 10,914'
Max Dogleg 16.7°/100'@ 10,053'
Downhole Revised:12/20/14 Updated by CAH 9/5/17
• • 21 3062
Seth Nolan Hilcorp Alaska, LLC 1 7 1 dl 7
GeoTech 3800 Centerpoint Drive, Suite 100 7
Anchorage, AK 99503
Tele: 907 777-8308 DATA LOGGED
Ifilvurp:Unrka.i.iA Fax: 907 777-8510 2oif,
E-mail: snolan@hilcorp.com M.K.BENDER
DATE 05/17/16
To: Alaska Oil & Gas Conservation Commission
Makana Bender
Natural Resource Technician II
333 W 7th Ave Ste 100 RECEIVED
Anchorage, AK
99501 . iv;,4Y 2 0 2016
DATA TRANSMITTAL �"° AOGCC
SCU 12B-09 . 1,
Perforation record prints and digital data
Prints:
Perforation Record Log
CD1: Elog digital data
SCU_12B-09_PERF_23FEB16.pdf 3/25/2016 3:02 PM PDF Document 3,438 KB
SCU_12B-09_PER.F_23FEB16_CORRELATIO... 3/25/20163:22 PM LAS File 2,340 KB
SCU 12B-09 PERF 23FEB16 CORRELATIO... 3,/25/20163:22 PM LAS File 568 KB
SCU 12B-09 PERF 23FEB16 CORRELATIO... 3/25/2016 3:22 PM LAS File 628 KB
SCU 12B-09 PERF 23FEB16 CORRELATIO,.. 3/25/2016 3:22 PM LAS File 752 KB
SCU 12B-09 PERF 23FEB16 CORRELATIO,.. 3/25/2016 3:22 PM LAS File 693 KB
SCU_12B-09_PERF_23FEB16_CORRELATIO,.. 3/25/2016 3:22 PM LAS File 78 KB
SCU 128-09 PERF 23FEB16 img.tiff 3/25/20163:02 PM TIFF File 4,126 KB
SCU_12B-09_PERF_23FEB16_Perf Pass Gu... 3/25/2016 3:02 PM LAS File 30 KB
SCU 12B-09 PERF 23FEB16 Perf Pass Gu... 3/25/20163:02 PM LAS File 66 KB
SCU 12B-09 PERF 23FEB16 Perf Pass Gu... 3/25/20163:02 PM LAS File 38 KB
SCU 12B-09 PERF 23FEB16 Perf Pass.Gu... 3/25/2016 3:02 PM LAS File 66 KB
SCU 12B-09 PERF 23FEB16 Perf Pass Gu... 3/25/2016 3:02 PM LAS File 86 KB
Please include current contact information if different from above.
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8337
Received ✓� O- 4
Date:
V €4
Seth Nolan Hilcorp Alaska, LLC Li 0 b
II GeoTech 3800 Centerpoint Drive
RECEIVic
Anchorage, AK 99503
Tele: 907 777-8308
Ifilrnrp tlirka.1.11. �" Fax 907 777-8510
APR 0 8 2016 E-mail: snolan@hilcorp.com
DATA LOGGED
DATE 04/05/16 AOGCC41,,3/2010.
;a K. BENDER
To: Alaska Oil & Gas Conservation Commission
Makana Bender
333 W 7th Ave Ste 100
Anchorage, AK
99501
DATA TRANSMITTAL
SCU 12B-09 CIkosE APlk-- 2"
Perforation data
Print:
Perforation Record
CD: digital version
a SCU_126-L9_PERF_23FEB16 3/25/2016 3:02 PM PDF Document 3.438 KB
.. SCU_12B-09_PERF_23FEB16_CORRELATIO,.. 3/'25,'2016 3:22 PM LAS File 2,340 KB
SCU_12B-09_PER.F_23FEB16_CORRELATIO... 3/25/2016 3:22 PM LAS File 568 KB
SCU_12B-09_PERF_23FEB16_CORRELATIO.,. 3/25/2016 3:22 PM LAS File 628 KB
SCU 12B-09_PERF_23FEB16 CORRELATIO... 3/25?2016 3:22 PM LAS File 752 KB
SCU_128-09_PERF_23FEB16_CORRELATIO... 3/25/2016 3:22 PM LAS File 693 KB
SCU_12B-09_PERF_23FEB16_CORRELATIO,,. 3/25/2016 3:22 PM LAS File 78 KB
i. SCU 12B-09 PERF 23FEB16 img 3/25/2016 3:02 PM TIFF File 4.126 KB
_ SCU_12B-09_PERF 23FEB16_Perf Pass Gu... 3.x25/2016 3:02 PM LAS File 30 KB
SCU 12B-09_PERF_23FEB16_Perf Pass Gu... 3/25/2016 3:02 PM LAS File 66 KB
SCU_12B-09_PERF_23FEB16_Perf Pass Gu... 3/25/2016 3:02 PM LAS File 38 KB
SCU_12B-09_PERF_23FEB16_Perf Pass Gu... 3/25x2016 3:02 PM LAS File 66 KB
SCU_12B-09_PERF_23FEB16_Perf Pass Gu,,. 3/25/2016 3:02 PM LAS File 86 KB
Please include current contact information if different from above.
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8337
Received eya/j� Date:
ill E c./.)
STATE OF ALASKA
ALL OIL AND GAS CONSERVATION COM SION
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing❑ Operations shutdown ❑
Performed: Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well❑ Other: Re-pert ❑.,
2.Operator 4.Well Class Before Work: 5. Permit to Drill Number:
Name: Hilcorp Alaska, LLC
Development ❑✓ Exploratory ❑ 213-062
3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic❑ Service ❑ 6.API Number:
Anchorage,Alaska 99503 50-133-10126-02
7.Property Designation(Lease Number): 8.Well Name and Number:
A028997 Soldotna Creek Unit(SCU) 12B-09
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s):
N/A Swanson River Field/Hemlock Oil
11. Present Well Condition Summary:
Total Depth measured 11,412 feet Plugs measured N/A feet 'AR 2 4 2016
true vertical 10,535 feet Junk measured N/A feet ( �/'�[�{
Effective Depth measured 10,570 feet Packer measured 9,491 feet -�"lel�T
true vertical 10,331 feet true vertical 9,484 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 32' 20" 32' 32'
Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi
Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi
Production
Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi
Perforation depth Measured depth See Attached Schematic APR 1 9 2.°V5
16
True Vertical depth See Attached Schematic 1,01/40 f
Tubing(size,grade,measured and true vertical depth) 3-1/2" 9.3#/L-80 9,567'MD 9,560'TVD
DHL Hydraulic Pkr 9,491'MD 9,484'TVD
Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A
12.Stimulation or cement squeeze summary: N/A
Intervals treated(measured): N/A
Treatment descriptions including volumes used and final pressure: N/A
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 11 7 5 600 175
Subsequent to operation: 27 8 7 560 160
14.Attachments(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations Cl Exploratory❑ Development 0 Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil E Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
316-078
Contact Joe Kaiser Email lkaiser@hilcorp.com
Printed Name Chad Helgeson Title Operations Manager
Signature 1,:',/, Phone 907-777-8405 Date .'/71 /l C
Form 10-404 Revised 5/2015 y s}LG RBDMS \A/ MAR 1 5 2016 Submit Original Only
4- 4/4/7
• •
Hilcorp Alaska, LLC
Well Operations Summary
Well Name Rig API Number Well Permit Number Start Date End Date
SCU 12B-09 E-Line 50-133-10126-02 213-062 2/23/16 2/24/16
Daily Operations:
02/23/2016-Tuesday
Mobe equipment to location. PTW and JSA. Spot equipment and rig up lubricator. Presssure test lub to 250 psi low and
2,000 psi high. RIH with CCL/GR and tie into Halliburton plug log dated 4-13-15 and tagged fill at 10,368'. Run correlation log
and sent to Dan Taylor. Log was 1 foot high but we still could not reach the H1 perf. POOH to run G2 perf guns. TP 160 psi
flow at 10 bpd. RIH w/2-1/2" x 20' Razor 6 spf, 60 deg phase and tied into Halliburton correlation log from last run. Ran
correlation perf log#1 and sent to town. Got ok to perf from 10,340'to 10,360'. Spotted gun and fired with 160 psi on well
flowing. Saw no change in pressure after 5 min. POOH. RIH w/2-1/2" x 20' Razor 6 spf, 60 deg phase and tied into
Halliburton correlation log from last run. Ran correlation perf log#2 and sent to town. Got ok to perf from 10,320' to
10,340'. Spotted gun and fired with 160 psi on well flowing. Saw no change in pressure after 5 min. POOH. RIH w/2-1/2" x
12' Razor 6 spf, 60 deg phase and tied into Halliburton correlation log from last run. Ran correlation perf log#3 and sent to
town. Got ok to perf from 10,308' to 10,320'. Spotted gun and fired with 160 psi on well flowing. Saw no change in pressure
after 5 min. POOH. Rig for standy, will keep flowing well overnight and finish the 2 runs in the morning.
02/24/2016-Wednesday
PTW and JSA and rig up lubricator. Pressure test lub to 250 psi low and 2,000 psi high. RIH w/2-1/2" x 17' Razor 6 spf, 60 deg
phase and tied into Halliburton correlation log from last run. Ran correlation perf log#4 and sent to town. Got ok to perf
from 10,283' to 10,300'. Spotted gun and fired with 160 psi on well flowing. Saw no change in pressure after 5 min. POOH.
At 700' lost tool wt and gained it back after 50' to 60'. Acted like slug of fluid blow us up hole. It kinked 50' of line. Cut off
60' line and put new rope socket on line. RIH w/2-1/2" x 20' Razor 6 spf, 60 deg phase and tied into Halliburton correlation
log from last run. Ran correlation perf log#5 and sent to town. Got ok to perf from 10,222' to 10,242'. Shut gas lift off.
Spotted gun and fired with 300 psi on tubing and 400 psi on casing after equalizing. POOH. Rig down lubricator and turn well
over to field.
Soldotna Creek Unit
n • • Well: SCU 12B-09
SCHEMATIC Completion Ran:9/12/13
PTD: 213 062
nihnrp:1la.ka.I''
API: 50-133-10126-02
Ground Elev: 120'Above MSL
KB-THF: 19.0'/KB-GL: 18.6'
1
22" 2 CASING DETAIL
Size Type Wt Grade Conn. ID Top Btm
20" Conductor Surf 32'
11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009'
29 N-80 BTC 6.184" Surf 288'
26 N-80 BTC 6.276" 288' 1,048'
11-3/�„G 7” Intermediate 23 N-80 BTC 6.366" 1,048' 4,715'
3 26 N-80 BTC 6.276" 4,715' 6,543'
29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830'
4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600'
TUBING DETAIL
3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567'
I iiiiii ' DV Collar @ 6,796'
5)
JEWELRY DETAIL
No. Depth ID OD Item
1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box
6 li 2 20' 2.992" 4.470" XO,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin
3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1
4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2
5 6,802' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#3
7 6 8,000' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#4
7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5
8 9,395' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD Orifice#6
81 9 9,442' 2.992" 5.313" Chemical Injection Mandrel
10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release)
9 11-11011 9,534' 2.813" 4.500" X-Nipple
12 9,567' 2.992" 4.470" WL Entry Guide
Lai 3 i. 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement
10 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
11 X
12�] Top of Liner
Hanger @ 9,606'
7 , Window @ 9,830'
Tag fill @ 10,368' PERFORATION DETAIL
w/E-line on Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments Date
2/23/16 G-z v10,222' 10,242' 10,167' 10,181' 6 20 60 Open 2/24/16
r,•%•%•%}}•'� H-1 G2 .40,283' 10,300' 10,205' 10,215' 6 17 60 Open 2/24/16
✓L{y{L{:•:: 10,308' 10,360' 10,219' 10,243' 6 52 60 Open 2/23/16
13 H-1 10,374' 10,390' , 10,249' 10,256' 6 16 60 Open 4/14/15
H 2 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated 9/15/13
2r11111•F11.
r•r•r•r•r
r•r•r.r•r Tag10,494'RKBM
.L.ti.ti•ti.ti..
14 ,tirtirti�tirtir
..;;VS;d{{{:ill 2.25"bailer 12/20/14
.ti'.4'•tif{{{{,
▪r•r•r•r•r
15 ,tirtirtirtirtir II
ftirtirti.
4-1/2" 4 - _ \Shoe @ 10,600'
openhole
6"hole
PBTD=10,570'MD/10,331'TVD
TD=11,412'MD/10,535'TVD
Max Deviation 78°@ 10,914'
Max Dogleg 16.7°/100'@ 10,053'
Downhole Revised:12/20/14 Updated by DMA 03/23/16
• •
L OF T8
. ,.,,,,�„,. THE STATE Alaska Oil and Gas
�,',.e'�dsTli Of A T Q S KA Conservation Commission
333 West Seventh Avenue
14."V1111-\'T".•''
f GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572
r h.
-.�! Main: 907.279.1433
°FALAS*P' Fax: 907.276.7542
www.aogcc.alaska.gov
Chad Helgeson
Operations Manager C 44E t i�,l� ' 'U,ti
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Swanson River Field, Hemlock Oil Pool, SCU 12B-09
Permit to Drill Number: 213-062
Sundry Number: 316-078
Dear Mr. Helgeson:
Enclosed is the approved application for sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the
AOGCC an application for reconsideration. A request for reconsideration is considered timely if
it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend.
Sincerely,
A14.
/7/L,
Cathy . Foerster
., Chair
DATED this 1 i day of February, 2016.
RBDMS Lk- FEB 1 9 2016
•
0 0 RECEIVED
STATE OF ALASKA FEB 0 3 2016
• ALASKA OIL AND GAS CONSERVATION COMMISSION O .S' 2.4) tio
APPLICATION FOR SUNDRY APPROVALS AOGC
20 AAC 25.280
1.Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑
Suspend ❑ Perforate 0 - Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: Re-pert ❑.,
2.Operator Name: Hilcorp Alaska,LLC 4.Current Well Class: 5. Permit to Drill Number:
Exploratory ❑ Development E. 213-062
3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic ❑ Service ❑ 6.API Number.
Anchorage,Alaska 99503 50-133-10126-02-00 '
7. If perforating: 8.Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? CO 123B -
Soldotna Creek Unit(SCU)12B-09 -
Will planned perforations require a spacing exception? Yes ❑ No ❑.,
9. Property Designation(Lease Number): 10. Field/Pool(s):
A028997 • Swanson River Field/Hemlock Oil •
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD(ft): 'Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD):
11,412' 10,535' • 10,570' 10,331' 1,400 psi N/A N/A
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 32' 20" 32' 32'
Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi
Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi
Production
Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi
Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
See Attached Schematic See Attached Schematic 3-1/2" 9.3#,L-80 9,567'
Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft):
DLH Hydraulic Packer; N/A 9,491'MD/9,484'TVD; N/A
12.Attachments: Proposal Summary ❑✓ Wellbore schematic ❑✓ 13.Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development R' Service ❑
14.Estimated Date for 15.Well Status after proposed work:
CommencingOperations: February 18,2016 OIL WINJ WDSPL
p ❑ ' ❑ ❑ Suspended ❑
16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. I hereby certify that the foregoing is true and the procedure approved
herein will not be deviated from without prior written approval. Contact Joe Kaiser-777-8393
Email jkaiser@hilcorp.com
Printed Name Chad Helgeson Title Operations Manager
Signature 6/.7/74/ Phone 907-777-8405 Date z_/3/I tv
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number
31 (19 - 01$
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other:
Post Initial Injection MIT Req'd? Yes ❑ No ❑ L/
Spacing Exception Required? Yes ❑ No Subsequent Form Required: 0 C i
RBDMS LA- FEB 1 9 2018
/��li /
�',f/,Y— APPROVED BY
Approved by: � -- COMMISSIONER( H C MMISSION Date:2 X /
17 6
Submit Form and
Form 10403 Revised 11/2015 Approved application is va f r 2 months from the date of approval. Attachments in Duplicate
4/-4
. •
Well Prognosis
•
Well: SCU 12B-09
IliIcorp Alaska,LL Date: 2/3/2016
Well Name: SCU 12B-09 API Number: 50-133-10126-02
Current Status: Gas Lifted Oil Well Leg: N/A
Estimated Start Date: February 18`h, 2016 Rig: E-line
Reg.Approval Req'd? 403 Date Reg.Approval Rec'vd:
Regulatory Contact: Donna Ambruz 777-8305 Permit to Drill Number: 213-062
First Call Engineer: Joe Kaiser (907) 777-8393 (0) (907)952-8897 (M)
Second Call Engineer: Chad Helgeson (907) 777-8405 (0) (907) 229-4824 (M)
AFE Number:
Current Bottom Hole Pressure: — 1,690 psi @ 10,234' TVD (Based on Survey taken on 2/1/2016.)
Max. Potential Surface Pressure: — 1,400 psi (Based on gas lift pressure)
Brief Well Summary
Soldotna Creek Unit 12B-09 was drilled as a sidetrack of SCU 23A-09 and the liner was run in September 2013. A
gaslift completion was run in September 2013 with perforations in the Hemlock H-2 bench added thru tubing. In April
2015 the H-2 reservoir was depleted sufficiently and was isolated with a thru-tubing plug and the H-1 was perforated.
Plan forward is to add additional perforations in the H-1 Hemlock and new perforations in the Tyonek G-2 zone,
Objective:
Add perforations in the Hemlock H-1 bench and the Tyonek G-2 bench.
Well Conditions:
Using slickline, ensure tubing is clear of paraffin (2.75" minimum) and tag below 10,420'. Clean fill if necessary.
E-line Procedure:
1. MIRU E-line, PT lubricator to 2,000 psi Hi/250 Low for 10 min.
2. RU 2.5" 6 spf HC wireline guns (6spf shot density).
3. RIH and perforate the following intervals:
NOTE:Perforate H-1 sand first and test well for production impact prior to adding G-2 sand
perforations. Rig down E-line during this production testing time.
Zone Sand (Top) Btm(MD) (Top) Btm(TVD) SPF Status
Tyonek G2 10,222' 10,360' 10,167' 10,242' 6 Proposed •
Hemlock H1 10,390' 10,420' 10,255' 10,268' 6 Proposed
a. Proposed perf interval shown on the proposed schematic.
b. Final perfs tie-in sheet will be provided to the field for exact perf intervals.
c. Correlate using Cement Bond Log (pending Tie-in log).
d. Use Gamma/CCL to correlate.
e. All perforations in table above are located in the Hemlock Pool based on Conservation -
Order No. 1236 Rule 5.
4. RD E-line.
5. Turn well over to production.
• •
Well Prognosis
• Well: SCU 12B-09
Ililcarp Alaska,LL Date:2/3/2016
Attachments:
1. Current Schematic
2. Proposed Schematic
•
• • Soldotna Creek Unit
11 Well: SCU 12B-09
•
SCHEMATIC Completion Ran:9/12/13
PTD: 213-062
Ili!cora Alaska,IAA:
API: 50-133-10126-02
Ground Elev:120'Above MSL
KB-THF:19.0'/KB-GL:18.6'
J CASING DETAIL
22"!J 2 Size Type Wt Grade Conn. ID Top Btm
20" Conductor - - - Surf 32'
11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009'
29 N-80 BTC 6.184" Surf 288'
26 N-80 BTC 6.276" 288' 1,048'
11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715'
3 il 26 N-80 BTC 6.276" 4,715' 6,543'
"mayMt" 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830'
4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600'
4 TUBING DETAIL
°N a 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567'
IDV Collar @ 6,796'
,.#, 5 I
lo'
JEWELRY DETAIL
t tt No. Depth ID OD Item
'w8
1 19' 2.992" Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box
6 1 1 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin
kAll
3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1
° 4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2
5 6,802' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#3
7 P 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4
1,10 iii,
r� 7 8,844' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#5
Til '7j 8 9,395' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD Orifice#6
8 i 0 9 9,442' 2.992" 5.313" Chemical Injection Mandrel
10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release)
1. 9 11 9,534' 2.813" 4.500" X-Nipple
.� NI 12 9,567' 2.992" 4.470" WL Entry Guide
10 w l . l l a. 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement
49 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
J
15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
'd 11isi vi,
12 - Top of Liner
y Hanger @ 9,606'
7„ r f
Window @ 9,830'
'II PERFORATION DETAIL
0, Date Zone _ Top(MD) Btm(MD) _ Top(TVD) Btm(TVD) SPF Ft Phase Comments
4/14/15 H-1 _ 10,374' 10,390' _ 10,249' 10,256' 6 16 60 Open
H4 9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated
13
,.
L L r.
*N 't$'a a Tag @ 10,494'RKBM
,♦♦,2,y,,,., 2.25"bailer 12/20/14
**.,.,
14 tirw
'
15 * <tk;;
r: }
4-1/r :1 e a Shoe @ 10,600'
"' row "
openhole ,../,:, o.,„
y- * :,p 6"hole
PBTD=10,570'MD/10,331'TVD
TD=11,412'MD/10,535'ND
Max Deviation 78°@ 10,914'
Max Dogleg 16.7°/100'@ 10,053'
Downhole Revised:12/20/14 Updated by DMA 05/11/15
!' Soldotna Creek Unit
Well: SCU 12B-0
' 8-09
PROPOSED SCHEMATIC Completion130629/12/13
PTD:
HaOfl tl.LU.I.I.I
API: 50-133-10126-02
Ground Elev:120'Above MSL
KB-THF:19.0'/KB-GL:18.6'
1 CASING DETAIL
22" 2im.
[L Size Type Wt Grade Conn. ID Top Btm
20" Conductor Surf 32'
11-3/4" Surf.Csg 47 1-55 8RD 11.00" Surf 2,009'
29 N-80 BTC 6.184" Surf 288'
26 N-80 BTC 6.276" 288' 1,048'
11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715'
3 IIK , 26 N-80 BTC 6.276" 4,715' 6,543'
.i
e29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830'
4
4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600'
4 I TUBING DETAIL
;., st▪4 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567'
DV Collar @ 6,796'
• 5 1 I,
JEWELRY DETAIL
r ' No. Depth ID OD Item
w,: VI 1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box
6 i 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin
3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1
te 4 4,996' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#2
5 6,802' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#3
't 7 L* 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4
` 7 8,844' 2.992 5.250" 3-1/2"SFO-1 Mandrel 8RD#5
;' ' 8 9,395' 222.,999999222,: ,;
.992" 5.250 3-1/2"SFO 1 Mandrel 8RD Orifice#6
' wK` 9 9,442' 2.992" 5.313" Chemical Injection Mandrel
• 8 ,,'-
10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release)
ss
s; 9 ,+ 11 9,534' 2.813" 4.500" X-Nipple
' 111 Yom± 12 9,567' 2.992" 4.470" WL Entry Guide
▪.
,x
,.: 13 10,443' 3.958" 2.75"Plug(ITS 4200-275-AC-001)w/10'cement
10 ' 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
fi 1
im
15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
"• 11 f r44
t 12 !
r Top of Liner
s` w..,.:*',
Hanger @ 9,606'
T..
�I
7" '4111 Window @ 9,830'
tal
. t,"'
'PERFORATION DETAIL
11
1 G-2 Date Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments
G2 10,222' 10,360' 10,167' 10,242' 6 138 60 Proposed •
y H-1 H-1 10,390' 10,420' 10,255' 10,268' 6 30 60 Proposed
f .Ir" 4/14/15 H-1 10,374' 10,390' 10,249' 10,256' _ 6 16 60 Open
13 y 9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated
„ H-2
:,°:,/A,,,.*,Li Tag @ 10,494'RKBM
14 .,°,�, 2.25"bailer 12/20/14
/ '/
15 `''r4i8r
4-1/2" .+ '4` Shoe @ 10,600'
openhole .� .
1.",r i'r f 6"hole
PBTD=10,570'MD/10,331'ND
TD=11,412'MD/10,535'ND
Max Deviation 78°@ 10,914'
Max Dogleg 16.7°/100'@ 10,053'
Downhole Revised:12/20/14 Updated by JEK 1/29/16
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Abandon U Plug Perforations U Fracture Stimulate U Pull Tubing U Operations shutdown U
Performed: Suspend ❑ Perforate El Other Stimulate El Alter Casing ❑ Change Approved Program ❑
Plug for Redrill ❑ srforate New Pool El Repair Well ❑ Re-enter Susp Well ❑ Other: ❑
2.Operator 4.Well Class Before Work: 5.Permit to Drill Number:
Name: Hilcorp Alaska,LLC Development ❑ Exploratory ❑ 213-062
3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic❑ Service ❑ 6.API Number:
Anchorage,Alaska 99503 50-133-10126-02
7.Property Designation(Lease Number): 8.Well Name and Number:
A028997 Soldotna Creek Unit(SCU)12B-09
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):
N/A Swanson River Field/Hemlock Oil
11.Present Well Condition Summary:
Total Depth measured 11,412 feet Plugs measured N/A feet ' 'e^
true vertical 10,535 feet Junk measured N/A feet m/_ 1 1 201,1
Effective Depth measured 10,570 feet Packer measured 9,491 feet p� r ,�,
GC
true vertical 10,331 feet true vertical 9,484 feet R"11�J
Casing Length Size MD ND Burst Collapse
Structural
Conductor 32' 20" 32' 32'
Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi
Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi
Production
Liner 994' 4-1/2" 10,600' 10,33483' 8,430 psi 7,500 psi
2
Perforation depth Measured depth See Attached Schematic N ED j��' 0 (1 15
True Vertical depth See Attached Schematic
Tubing(size,grade,measured and true vertical depth) 3-1/2" 9.3#/L-80 9,567'MD 9,560'ND
DHL Hydraulic Pkr 9,491'MD 9,484'ND
Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A
12.Stimulation or cement squeeze summary: N/A
Intervals treated(measured): N/A
Treatment descriptions including volumes used and final pressure: N/A
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 0 0 0 100 150
Subsequent to operation: 30 1 45 750 160
14.Attachments(required per 20 AAC 25 070,25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations 0 Exploratory LI Development Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas ❑ WDSPL❑
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
315-196
Contact Joe Kaiser Email jkaiserc hilcorp.com
Printed Name Joe Kaiser Title Operations Engineer
Signature .lr Phone 907-777-8393 Date Viy—
5-fig -15 �BDM MAY 1 1 2015
Form 10-404 Revised 5/2015 Submit Original Only
,3 /df/ice
Hilcorp Alaska, LLC
Well Operations Summary
Well Name API Number Well Permit Number Start Date End Date
SCU 12B-09 50-133-10126-02 213-062 4/13/15 4/14/15
Daily Operations:
04/13/2015- Monday
PTW and JSA. Mobe to location and spot equipment. Rig up lubricator and pressure test to 250 psi low and 3,000 psi high. TP
300 psi. RIH w/2.75" dummy gun and tag at 10,483' (correlated to correlation log#3). POOH. Test plug equipment. RIH with
2.75"TTS magna range BP and attempt to tie into Pollard CBL log dated 12 Sep 14. Ran correlation log and sent to town.
Correlation hard to figure out. Spot plug from Halliburton Plug Correlation log#3 at 10,443'.TP-300 psi. Pull up 30' and went
back down and tagged plug. POOH. Mix cement and top fill 2" x 30' positive displacement bailer and go in hole. Dump bailer
on top of plug at 10,443'. POOH and bailer dumped -ok. Clean and redress bailer. Add cement and go in hole and dump bail
cement on top of plug at 10,443'.That gives 10'_of cement on top of plug. Cement in place at 2:23 AM. Rig down lubricator
and clean bailer.
04/14/2015 -Tuesday
PTW and JSA. Mobe to location. Rig lubricator back up. Pressure test to 250 psi low and 3,000 psi high. Arm gun. Field put 600
psi on tubing. RIH w/2-1/2" x 16' HC, 6 spf, 60 deg perf gun and tie into Halliburton plug correlation log dated 4-13-15. Run
correlation log and send to town. Get ok to perf. Spot shot from 10,374' to 10,390'.TP-650 psi. Fired gun and tubing
pressure went to 750 psi. POOH. Rig down lubricator and turn well over to field.TP-900 psi.
Soldotna Creek Unit
II Well: SCU 12B-09
SCHEMATIC Completion Ran:9/12/13
PTD:213-062
o
Hikorp Alaska,UA:
API: 50-133-10126-02
Ground Elev:120'Above MSL
KB-THF:19.0'/KB-GL:18.6'
i CASING DETAIL
zz" J 2 [k Size Type Wt Grade Conn. ID Top Btm
20" Conductor - - -
J-55
Surf 32'
11-3/4" Surf.Csg 47 8RD 11.00" Surf 2,009'
29 N-80 BTC 6.184" Surf 288'
26 N-80 BTC 6.276" 288' 1,048'
11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715'
3 26 N-80 BTC 6.276" 4,715' 6,543'
17,1 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830'
4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600'
4 TUBING DETAIL
3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567'
IDV Collar @ 6,796'
'q 5 i +c.
JEWELRY DETAIL
i No. Depth ID OD Item
4t 1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box
6 i 2 20' 2.992" 4.470" _ X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin
I, 3 2,752' 2.992" - 5.250" 3-1/2"SF0-1 Mandrel 8RD#1
a 1/1 4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2
1,1
5 6,802' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#3
7 l 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4
i i 7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5
j 8 9,395' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD Orifice#6
all 9 9,442' 2.992" 5.313" Chemical Injection Mandrel
10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release)
SY 9 11 9,534' 2.813" 4.500" X-Nipple
i 1+ 12 9,567' 2.992" 4.470" WL Entry Guide
4 I I§ l , 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement
10 i 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
,j ,)ni 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
;*4 11 X •'
12 I' Top of Liner
r � Hanger @ 9,606'
1 � Window @ 9,830'
• V, PERFORATION DETAIL
Id Date Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments
di .,..---v 4/14/15 H-1 10,374' 10,390' 10,249' 10,256' 6 16 60 Open
fH-1 9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated
13 AM11
1 fc1143'
H-2
it.m?5r• .
{•1.1r•r•r•r•r Tag10,494'RKBM
.1.1.
r•r•r•r•r @
:'1'1'1'1'
14 1f{?;{{f{r 2.25"bailer 12/20/14
•.1�1�1g1'1•'
Lr•r•r•r•r
•1.1.41•
15 +•1.1.1.
•r•r•r•1r
•
r•1r•r•r•1r
11..
4-1/2" ' • 1 SI,Shoe @ 10,600'
openhole • ,•
t
6"hole
PBTD=10,570'MD/10,331'ND
TD=11,412'MD/10,535'ND
Max Deviation 78°@ 10,914'
Max Dogleg 16.7°/100'@ 10,053'
Downhole Revised:12/20/14 Updated by DMA 05/11/15
OF T�
, (vi)P*I//j,cv THE STATE Alaska Oil and Gas
ti�,;,. ��, ofALASIc;A
Conservation Commission
___=_
333 West Seventh Avenue
GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572
Main: 907.279.1433
OF ALASY'N- Fax: 907.276 7542
www.aogcc.alaska gov
SCAN
Joe Kaiser / _
Operations Engineer
_ O((
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Swanson River Field, Hemlock Oil Pool, SCU 12B-09
Sundry Number: 315-196
Dear Mr. Kaiser:
Enclosed is the approved application for sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the
AOGCC an application for reconsideration. A request for reconsideration is considered timely if
it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend.
Sincerely,
,p1P/
Daniel T. Seamount, Jr.
Commissioner
DATED this day of April, 2015
Encl.
,i �� IVED
STATE OF ALASKA d,r'R 0 2 2015
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS 400CC
20 AAC 25.280
1.Type of Request: Abandon❑ Plug for Redril E Perforate New Pod❑ Repair Weill] Change Approved Program 0
Suspend❑ Plug Perforations 2 . Perforate❑., • Pull Tubing❑ Time Extension❑
Operations Shutdowi❑ Re-enter Susp.Wel ❑ Stimulate❑ Alter Casing❑ Other:❑
2.Operator Name Hilcorp Alaska,LLC 4.Current Well Class. 5.Permit to Drill Number.
Exploratory ❑ Development 2 - 213-062 •
3.Address 3800 Centerpoint Drive,Suite 100 Stratigraphic ❑ Service 111 •
6.API Number.
Anchorage,Alaska 99503 50-133-10126-02-00
7.If perforating. 8.Well Name and Number.
What Regulation or Conservation Order governs well spacing in this pool? CO 123B
Soldotna Creek Unit(SCU)128-09 -
Will planned perforations require a spacing exception? Yes ❑ No ❑
9.Property Designation(Lease Number): 10.Field/Pool(s).
A028997 •
Swenson River Field I Hemlock Oil •
, 11. PRESENT WELL CONDITION SUMMARY
Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft). Effective Depth TVD(ft): Plugs(measured): Junk(measured):
11,412 • 10,535 - 10,570 10,331 N/A N/A
Casing Length Size MD ND Burst Collapse
Structural
Conductor 32' 20" 32' 32
Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi
Intermediate 9,830' 7" 9,830' 9,822 6,340 psi 3,830 psi
Production
Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi
Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
See Attached Schematic See Attached Schematic 3-1/2" 9.3#,L-80 9,56T
Packers and SSSV Type: Packers and SSSV MD(t)and ND(ft):
DLH Hydraulic Packer;N/A 9,491'WD/9,484'ND;N/A
12.Attachments. Description Summary of Proposal 2 13.Well Class after prop.sed work:
Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigrephic❑ Development 17/1 - Service ❑
14.Estimated Date for • 15.Well Status after prop3sed work:
Commencing Operations: 04/09/15 Oil Q . Gas ❑ WDSPL ❑ Suspended ❑
16.Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG ❑ Abandoned ❑
Commission Representative: GSTOR ❑ SPLUG ❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Joe Kaiser Phone: 907-777-8393
Email jkaiserE hilcorn.con1
Printed Name Joe Kaiser Title Operations Engineer
Signature677/404/q.. Pbr
a)c, 1)4--C Phone 907-777-8393 Date yr/Zil
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number. 1
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other:
Spacing Exception Required? Yes ❑ No [1( Subsequent Form Required' ;0-- VC I
APPROVED BY l!/
Approved by: COMMISSIONER THE COMMISSION Date: /
)i(--;-
%c, 41-6,-/c /eA ii-g-/-5'
Submit Form and
Form 10-403(Revised 10/2012) pproVed application 01RileottNAILlate of approve. A achments i Duplicate
RBDMS�� APR 9 2015 , i�7/ 5 /.
Well Prognosis
Well: SCU 128-09
[lilcorp Alaska,Lb
Date:4/01/2015
Well Name: SCU 12B-09 API Number: 50-133-10126-02
Current Status: Gaslifted Oil Well Leg: N/A
Estimated Start Date: April 9, 2015 Rig: N/A
Reg.Approval Req'd? 403 Date Reg.Approval Rec'vd:
Regulatory Contact: Donna Ambruz 777-8305 Permit to Drill Number: 213-062
First Call Engineer: Joe Kaiser (907) 777-8393 (0) (907) 952-8897 (M)
Second Call Engineer: Chad Helgeson (907)777-8405 (0) (907) 229-4824 (M)
AFE Number:
Current Bottom Hole Pressure: —400 psi @ 10,280' TVD (Based on Survey taken on 9/15/14.)
Maximum Expected BHP: — 1,200 psi @ 10,249' TVD (Estimate based on offset wells
Max.Allowable Surface Pressure: — 175 psi (Based on gas gradient[0.10psi/ft])
Brief Well Summary
Soldotna Creek Unit 12B-09 was drilled as a sidetrack of SCU 23A-09 and the liner was run in September 2013. A
gaslift completion was ran in September 2013 with perforations in the Hemlock H-2 bench added thru tubing. April 2015 /
the gas reservoir was depleted sufficiently. Plan is to isolate the H-2 with a thru-tubing plug and perforate the H-1 in •
April 2015.
Notes Regarding Wellbore Condition
• Well is shut-in. Recent test on 3/23/2015 was 58 mcfd at 160 psi.'
OBJECTIVE OF WORKOVER
Plugback H-2.Add new perfs in the Hemlock H-1 bench.
E-line Procedure:
1. MIRU E-line, PT lubricator to 3,000 psi Hi 250 Low.
2. RU gauge ring assembly. RIH and tag bottom. POOH
3. RU 2.75"Through tubing bridge plug. RIH with plug.
4. Set 2.75" plug in 4.5" liner at 10,443'. POOH
5. RU bailer assembly. RIH with bailer assembly. Dump bail +/- 10'of cement. POOH.
6. Rig up gas lift lines to tree. Production to gaslift off top of well to achieve desired underbalance.
a. Est BHP= 1L200 psi. Est hydrostatic= 1,040 psi. (Fluid level at GLM #6 at 9395' MD and SITP
of 200 psi)
7. RU 2.5" 6 spf HC wireline guns(6spf shot density).
8. RIH and perforate Hemlock H-1 interval from 10,374'-10,390' (16').
9. RD E-line.
10. Turn well over to production.
Attachments:
1. Current Schematic
2. Proposed Schematic
Soldotna Creek Unit
Well: SCU 12B-09
ACTUAL SCHEMATIC PTD:: pleb- Ran:9/12/13
• "'I`"'°Ala"kn,LU. API: 50-133-10126-02
Ground Elev:120'Above MSL
KB-THF:19.0'/KB-GL:18.6'
1 --� CASING DETAIL
22" Z Size Type Wt Grade Conn. ID Top Btm
20" Conductor - - - Surf 32'
11-3/4" Surf.Csg 47 J-55 8RD 11.00" _ Surf 2,009'
_ 29 N-80 BTC 6.184" _ Surf _ 288'
26 N-80 BTC 6.276" 288' 1,048'
11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715'
3 EZIIM 26 N-80 BTC 6.276" 4,715' 6,543'
l+l si 29 N-80/P-110 BTC/8RD 6.184" 6,543' _ 9,830'
4 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600'
TUBING DETAIL
ivi, 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567'
iii 0 DV Collar @ 6,796'
'+a 5
is JEWELRY DETAIL
ii No. Depth ID OD Item
1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box
6 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin
41 3 2,752' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#1
i l % 4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2
' 5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3
6 _ 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4
', r" 7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5
�9i iii8 9,395' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD Orifice#6
8 9 9,442' 2.992" 5.313" Chemical Injection Mandrel
"' CV 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release)
j,+ 9- is 11 9,534' 2.813" 4.500" X-Nipple
-1 M1) 12 9,567' 2.992" 4.470" WL Entry Guide
I :..I I I, 13 _ 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
10 Lu'+� 14 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
.•—•., d Y
' 11
''.. 12 gi t; Top of Liner
. hip P Hanger @ 9,606'
7 i,j
Window @ 9,830'
. . PERFORATION DETAIL
. Date Zone Top(MD) _ Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments
9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 2-1/2"HC Connex
H-2
• �1f7r7i7r71
'�r�'�'Sr Ta 10,494'RKBM
7.7.7.7.7.
{tirtirtirtir g
13 ,:;fti{;:; 2.25"bailer 12/20/14
,{!iti 1A7.
.47f{f7 127 •
f.f.f.f.f
14 f1.°f{itiC1�7.1.7.
4-1/2" ; h.-4," '. Shoe @ 10,600'
openhole
'f.
s ' 6"hole
PBTD=10,570'MD/10,331'ND
TD=11,412'MD/10,535'ND
Max Deviation 78°@ 10,914'
Max Dogleg 16.7°/100'@ 10,053'
Downhole Revised:12/20/14 Updated by STP 1/02/15
do
Well:SolSCUtnaCreek 12B-09Unit
II PROPOSED SCHEMAl IC Com lets nRan:9/12/13
13
Hilrnrp Alaska,LLC
API: 50-133-10126-02
Ground Elev:120'Above MSL
KB-THF:19.0'/KB-GL:18.6'
1 CASING DETAIL
zz" di.1 2 Size Type Wt Grade Conn. ID Top Btm
20" Conductor - - - Surf 32'
11-3/4" Surf.Csg 47 1-55 8RD 11.00" Surf 2,009'
29 N-80 BTC 6.184" Surf 288'
26 N-80 BTC 6.276" 288' 1,048'
11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715'
3 26 N-80 BTC 6.276" 4,715' 6,543'
29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830'
4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600'
a ill TUBING DETAIL
° 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567'
IDV Collar @ 6,796'
+w 5 4%
ivil
141 JEWELRY DETAIL
1, No. Depth ID OD Item
1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box
6 MIR ' 4.4 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin
03 2,752' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#1
4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2
5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3
7 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4
t' It 7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5
3i 8 9,395' 2.992" 5.250" 3 1/2"SFO 1 Mandrel 8RD Orifice#6
8 1 9 9,442' 2.992" 5.313" Chemical Injection Mandrel
10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release)
9 i' 11 9,534' 2.813" 4.500" X-Nipple
12 9,567' 2.992" 4.470" WL Entry Guide
I gam I 4 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement
10 + 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
0 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell
11 X
#" 12 — t', Top of Liner
,; Hanger @ 9,606'
Rif
7 MI Window @ 9,830'
liw
1.1
'; PERFORATION DETAIL
Date Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments /
Proposed H-1 10,374' 10,390' 10,249' 10256' 6 16 60 2-1/2"HC Connex V
p H-1 9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 2-1/2"HC Connex
13 ,r>1
H-2
�tiftif1ftiryr
i!.1'.l.r.r
iy.ti.ti.ti.ti.
...ti.ti.ti.ti.
f.f.f.r.r Tag @ 10,494'RKBM
14 II :f;:;fti f 2.25"bailer 12/20/14
,ti.ti.ti.::::
r.r.r.r.f
151,4111
1ti'ti�:r•r r"'}r}
••ti•ti•
.Shoe @ 10,600'
4
opCnholc
w
6"hole
PBTD=10,570'MD/10,331'ND
TD=11,412'MD/10,535'ND
Max Deviation 78°@ 10,914'
Max Dogleg 16.7°/100'@ 10,053'
Downhole Revised:12/20/14 Updated by STP 1/02/15
Hilcorp Alaska, LLC
SCU 12B-09
FINAL WELL REPORT
DML LOGGING DATA
Provided by:
Approved by: Kevin Eastham Compiled by: Larry Resch
Michael Sherry
Jane Grundin
Daniel Hillegeist
M i k e S t r a w n
Distribution: 10/31/2013 TD Date: August 26, 2013
SCU 12B-09
1
TABLE OF CONTENTS
1 MUDLOGGING EQUIPMENT & CREW ................................................................................................2
1.1 Equipment Summary ......................................................................................................................2
1.2 Crew................................................................................................................................................2
2 WELL DETAILS .....................................................................................................................................3
2.1 Well Summary.................................................................................................................................3
2.2 Hole Data........................................................................................................................................3
2.3 Well Synopsis. ................................................................................................................................4
2.4 Daily Activity Summary...................................................................................................................6
3 GEOLOGICAL DATA...........................................................................................................................14
3.1 Lithostratigraphy ...........................................................................................................................14
3.2 Lithologic Details...........................................................................................................................15
3.3 Connection Gases ........................................................................................................................17
3.4 Trip Gases ....................................................................................................................................17
3.5 Sampling Program / Sample Dispatch..........................................................................................18
4 DRILLING DATA..................................................................................................................................19
4.1 Directional Survey Data................................................................................................................19
4.2 Bit Record.....................................................................................................................................23
4.3 Mud Record ..................................................................................................................................24
5 SHOW REPORTS ...............................................................................................................................27
6 DAILY REPORTS ................................................................................................................................28
Enclosures:
2” / 100’ Formation Log (MD/TVD)
2” / 100’ Drilling Dynamics Log (MD/TVD)
2” / 100’ LWD Combo Log (MD/TVD)
2” / 100’ Gas Ratio Log (MD/TVD)
Final Data CD
SCU 12B-09
2
1 MUDLOGGING EQUIPMENT & CREW
1.1 Equipment Summary
Parameter Equipment Type / Position Total
Downtime Comments
Mudlogging Unit
Computer System
Canrig: 3 HP Compaq Workstations
(DML, RigWatch, and Sample Catcher) 0
Ditch Gas
Canrig: (2) QGM Gas Traps (with High RPM
Electric-Powered Agitators)
Canrig: E-Series FID THA Analysis and
Chromatography.
0
Pason EDR All Drilling Parameters 0
Block Height / Depth Pason WITS Feed 0
Hookload / WOB Pason WITS Feed 0
RPM Pason WITS Feed 0
Torque Pason WITS Feed 0
Return Flow Pason WITS Feed 0
Pit Volumes Pason WITS Feed 0
Mud Gain/Loss Pason WITS Feed 0
Pump Pressure Pason WITS Feed 0
Pump Strokes Pason WITS Feed 0
Rate of Penetration Calculated from Block Position tracking 0
Mud Flow In Calculated from Pump Output/Rate tracking 0
1.2 Crew
Unit Number : ML030
Unit Type : Arctic Steel Skid Unit
Mudloggers Years* Days*2 Sample Catchers Years Days*2 Technician Days
Larry Resch 13 47 Jane Grundin ML
Trainee 52
Michael Sherry 1 50 Nick Barber ML
Trainee 12
Daniel Hillegeist 1 7 Dickey Hudgins 1 28
Michael Strawn 5 5
*1 Years experience as Mudlogger.
*2 Days at well site.
SCU 12B-09
3
2 WELL DETAILS
2.1 Well Summary
Well: SCU 12B-09 API Number: 50-133-10126-02-00
Field: Swanson River Field Surface Co-Ordinates: 2616’ FSL, 2050’ FWL
Sec 9, T7N, R9W SM
Borough: Kenai Borough Primary Target Depth: Hemlock H7 10390’TVD
State: Alaska TD Depth: 11412’MD /10532’TVD
Rig Name / Type: Saxon 169/ Double Suspension Date: N/A
Primary Target: Hemlock Formation Permit to Drill: 213062
Spud Date: July 16, 2013 Ground Elevation: 126.3’ AMSL
Completion Status: Run 4-1/2” liner RKB Elevation: 143.8’ AMSL
Classification: Development Oil Secondary Target:
Depth:
Tyonek G-2
10218’TVD
TD Formation: Hemlock TD Date: August 26, 2013
Days Drilling: 41 Days Testing: None
2.2 Hole Data
Maximum Depth Shoe Depth FIT
(ppg) Hole
Section MD
(ft)
TVDSS
(ft)
TD
Formation
Mud
Wt
(ppg)
Dev.
(oinc)
Casing/
Liner MD
(ft)
TVDSS
(ft)
Tyonek 1.05 7” 9830’ -9679 13.5
6” 11412 -10389 Hemlock 8.9 78.21 4.5 10609’ -10202 N/A
SCU 12B-09
4
2.3 Well Synopsis.
SCU 12B-09 is the eight in a series of wells drilled by Hilcorp during the 2012-2013 drilling season. A
sidetrack of the parent well SCU 23A-09, SCU 12B-09 was designed with a strong deviated build from a
window cut through existing 7” casing at 9831’MD. Targets include the Lower Tyonek G2 sand and the
Hemlock H 7 and 10 sands.
Existing 7” casing was penetrated between 9831’MD and 9846’MD with initial hole drilled to 9870’MD with a
casing cutting mill. After displacing the bore to 10.45 ppg drilling fluid an FIT was conducted successfully to
13.5 ppg EMW. After pulling out of the hole and picking up a PDC bit, mud motor at 1.2 degrees, directional
tools and LWD, drilling commenced at 9870’MD. Initial attempts to slide and build hole angle at 8 degrees per
100 ft were met with minimal results of 6 degrees or less. Changing the motor to 1.4 degrees produced similar
results. Directional error at 10243’MD indicated the track to be 46.3 ft low and slightly right of the line. At
10262’MD/ 10240’TVD 100% loss of returns was experienced. Several days and many attempts to circulate/
squeeze various LCM products ultimately met with resulting losses cut to 6 bph. Total losses for this event
exceeded 3200 bbls. An attempt to drill ahead was made, only to loose 100% returns at 10271’MD/
10249’TVD. The decision to plug back and side track required three separate cement jobs to plug the hole
back inside the casing window. Operations on the initial bore hole, now known as SCU 12B-09 PB1 were
suspended on August 3, 2013, and preparations were made to drill a sidetrack well: SCU 12B-09.
After drilling/ dressing cement from 9207’MD thru the window to 9843’MD a trip was made out to pick up a
PDC bit on 1.8 degree mud motor with OnTrak and wireline Gyro equipment. Hole drilled from 9843’MD to
10001’MD proved unsuccessful in obtaining necessary angle of build. The decision was made to pull out of
the hole and re-run the tri-cone insert bit on a 2.2 degree motor and remove the near bit stabilizer which
achieved positive hole angle build results.
At 10509'MD a trip was made for a pdc bit on 1.2 mud motor. On the trip in to bottom, tight hole was
encountered at 10349'MD. After washing and reaming from 10349’MD to 10569'MD it was determined that an
inadvertent side-track was started. The decision was made to pullout of the hole and change over to a tri-cone
insert bit on 1.4 degree motor. The second ‘ghost’ bore hole from the window to TD at 10509’MD became
known as SCU 12B-09 PB2.
Drilling continued on the current bore SCU-12B09 from 10569’MD. Full returns were lost at 10602’MD. Once
returns were established we circulated bottoms up and observed 5911 units of gas and oil in the pits. Drilling
continued from 10602’MD to 11029’MD where instantaneous loss of returns were experienced once again.
Upon regaining returns to surface significant oil and gas were observed, with maximum gas readings
approaching 6700 units. Various LCM products were pumped down over the next several days in an effort to
regain circulation without success. Rig tripped out of hole to surface and serviced MWD tools.
After tripping back in to 10026’MD, mud was conditioned and circulated. As they proceeded to trip in to
11029’MD, circulation was lost. The rig drilled from 11029’MD to 11036’MD. Another LCM pill was pumped to
bottom and allowed to soak. The hole was drilled from 11036’MD to 11067’MD. More LCM was pumped
down in an attempt to regain circulation. Rig drilled from 11067’MD to 11099’MD. Several more LCM pills
were pumped down hole and circulation was reestablished. Returns to surface brought oil up over the shakers
and a maximum gas reading of 6460 units.
The rig tripped out of the hole five stands and circulated gas. Rig tripped out to 9765’MD to service MWD
tools, then tripped back into hole to 11099’MD. Well lost circulation and returns. Several more heavy LCM
pills were pumped down the well then rig drilled from 11099’MD to 11161’MD. Another LCM pill was pumped
down hole and allowed to soak. Rig then drilled from 11161’MD to 11412’MD. An attempt to circulate bottoms
up yielded no returns to surface. The rig tripped out of hole to 9773’MD and monitored well. The rig tripped
out of hole to surface and rig was serviced.
SCU 12B-09
5
Once to surface, MWD logs were collected and analyzed. It was determined that the well had entered the H10
Hemlock. It was decided to drill ahead. Rig tripped in to 11020’MD and hole was tight. Rig washed and
reamed down to 11069’MD. Partial circulation was gained and oil and gas were circulated out of hole. Well
shut in due to gas pressure and circulated through their choke. Rig tripped out of hole to 10878’MD and gas
was circulated out of the hole. A maximum gas reading of 5172 units was observed while circulating. Rig shut
in well and circulated through choke. Rig tripped back into hole to 11006’MD and an LCM pill was pumped
down hole to gain better circulation. They tripped out to 9769’MD and monitored well. Ten barrels of drilling
fluid were pumped down hole every half hour with no returns to surface. Rig tripped out to surface. Due to
well conditions, it was decided to call TD at 11412’MD.
After rig was serviced, it was decided to trip back into hole to wash and ream. In the prior run, the BHA had
encountered communication issues and no surveys after 10914’MD had been recorded. BHA with survey
tools and well commander tripped back into hole to 10169’MD and circulated bottoms up. The rig washed and
reamed from 10169’MD to 10390’MD. Rig tripped out of hole to 10136’MD and circulated. Rig proceeded to
wash and ream from 10166’MD to 10768’MD, where circulation was lost. An LCM pill was built and pumped
down the well and then pulled out of hole to 9820’MD. Pill was allowed to soak and rig was serviced.
Circulation was regained.
Rig tripped into hole from 9820’MD to 10373’MD and tagged a bridge or ledge. Rig washed and reamed from
10373’MD to 10690’MD where well lost circulation. Rig tripped out of hole to 9768’MD. Well commander
encountered technical difficulties and rig was unable to pump fluid down pipe. LCM pill was pumped down
annulus while rig worked to troubleshoot well commander at 9815’MD. Rig tripped out of hole from 9815’MD
to 9489’MD. Circulation through well commander was reestablished. Rig tripped down from 9489’MD to
10383’MD where mud was conditioned and circulated. Circulation was lost and an LCM pill was pumped
down the hole. Rig pulled out of hole to 9470’MD to allow LCM pill to soak. Well commander encountered a
problem and rig was unable to pump fluid down pipe. Well attempted to troubleshoot problems before tripping
out of hole to surface.
BHA was serviced, removing formation and LCM from inside BHA. Rig ran back into hole to complete
washing and reaming. Bit took weight at 10328’MD. Rig washed and reamed well from 10328’MD to
10610’MD. Sweeps were pumped down and circulated to clean out hole. A 45 BBL pill was pumped down
and displaced out of pipe. No losses were observed. Rig pulled out of hole to surface to prepare for liner job.
Rig tripped back into hole with 4.5” liner to 10609’MD and cement was pumped. There were no significant
losses to circulation while running liner into hole or during cement job.
SCU 12B-09
6
2.4 Daily Activity Summary
July 14, 2013:
Test casing to 3000 PSI for 30 minutes un-charted. Change out wash pipe. Test 9849 ft of 7” casing to 3000
PSI and hold for 30 minutes. Prep rig floor and rig down to POOH. POOH from 9849 ft to jars. Turn elevators
around to lay down jars. Lay down BHA. Rig Service rig and change out grabber dies.
July 15, 2013:
RIH with whipstock to 9796 ft. Displace well with 10.5 ppg 6% KCl PHPA mud. Rig up wireline tools. RIH with
gyro. Orient whipstock, tag at 9849 ft; gyro tool face set at 307 degrees. Log/ survey while POOH with wireline.
Rig down wireline. Set whipstock. Mill out window.
July 16, 2013:
Mill window in casing and rat hole from 9854 ft to 9870 ft. Pump sweep, circulate, rotate, and
reciprocate/polish window. Conduct FIT to 13.5 ppg emw; flow check. Pump slug. POOH from 9870 ft. Lay
down BHA #2; clean floor of all unneeded tools.
July 17, 2013:
Continue laying down BHA #2, clean floor of all un-needed tools. Rig service, clean floor, grease crown, wash
pipe, top drive. P/U directional tools, BHA #3, scribe tools. Test MWD tools. RIH.
July 18, 2013:
Slip and cut 75 ft drilling line. Test MWD tool. Circulate sweep. Rig up wireline tools. Wireline PJSM with
wireline crew; rig down wireline. PJSM with crew for POOH and clean and prep floor. Flow check PJSM
POOH for sub in BHA from 9862 ft to 483 ft. BOP drill while for TIH procedures. Finish POOH. Lay down
directional tools / remove source. Clean and clear rig floor. Test BOP’s.
July 19, 2013:
Test BOP components. Test blind Rams to 250 psi and 4000 psi. Pull test plug and install wear bushing.
PJSM with directional driller and rig crew for making up BHA. M/U bit, motor, UBHP and orientate UBHO.
PJSM with MWD and RPS to install sources. M/U BHA. M/U directional tools; test MWD tool. POOH for
MWD failure. Unload radioactive sources. Lay down MWD tools; P/U new tools and upload data.
July 20, 2013:
Continue TIH to 9747 ft. Test MWD tool. TIH from 9747 ft to 9867 ft. PJSM with wireline, DD, and rig crew
about wireline inside DP. Rig up and run wireline logs. Slide from 9870 ft to 9965 ft. POOH to remove side
entry sub. POOH with wireline; Rig down wireline equipment. Drill from 9965 ft to 10015 ft. ft
July 21, 2013:
Drill / slide from 10015 ft to 10087 ft. Trip out 5 stands and wait on rig orders. Rig service: grease blocks top
drive, DW, swivel, check dead man bolts and BOP drill. Trip out of hole to dial up motor. Rig service/grease
TD, DW, check all fluids. POOH. Unload radioactive sources, L/W directional tools. Adjust motor to 1.4 degree
bend, load data, load radioactive sources.
July 22, 2013:
TIH from 5126 ft to 10088 ft. Slide from 10088 ft to 10131 ft. Rotate from 10131 ft to 10158 ft. Slide from
10158 ft to 10173 ft. Rotate from 10173 ft to 10197 ft. Slide from 10197 ft to 10204 ft. Drilling from 10204 ft to
10246 ft.
SCU 12B-09
7
July 23, 2013:
Lost circulation at 10262 ft; pumped down hole and down back side. POOH to shoe. Build two LCM pills and
spot down hole. Fluid loss 303 BBL. Build surface volume and LCM pills. TIH from 9846 ft to 10262 ft. Pump
50 BBL 35 lb per BBL LCM pill. POOH from 10262 ft to 9814 ft. Pump mud down backside to fill hole and
check for loses and continue to re-build surface volume. RIH from 9847 ft to 10262 ft. Pump 23 BBL of 35 lb
per BBL LCM pill. Pump on backside and squeeze 16 BBL. Filled hole with trip tank and monitor well. Pumped
second 23 BBL of 35 lb LCM pill. Pumped on backside and squeezed 19 BBL. Filled with trip tank and monitor
well. Pump 23 BBL of 35 lb LCM pill.
July 24, 2013:
Finished chasing 23 bbl, 35 lb per bbl pill outside of bit. POOH inside window. Built mud volume. RIH to
bottom to pump 23 bbl, 35 lb per bbl LCM pill. Closed bag, and squeezed pill with 18.5 bbl mud; maximum
pressure 320 PSI. RIH to bottom and drill ahead. Drilled 8 ft of new formation with initial returns; lost returns
shortly after; lost 167 bbl. Spotted 23 bbl, 50 lb per bbl LCM pill on bottom and POOH to inside window.
July 25, 2013:
Spotted 25 BBL, 20 lb per bbl LCM pill. Squeezed 19.6 bbl at 244 psi. Tripped up inside window. Monitored
well; 34.5 BPH static losses. Built mud volume. Checked static well losses again; 70.5 BPH. RIH to bottom to
spot another 25 bbl, 20 lb per bbl LCM pill. Monitored well; ~30 BPH static losses.
July 26, 2013:
Monitor well with trip tank while building surface mud volume. POOH from 9775 ft to 8907 ft. Rig service:
greased draw works, tongs, inspected slips and checked oil levels. POOH from 8904 ft to 5909 ft slowly and
monitor losses. POOH from 5909 ft to 735 ft; lay down HWDP from 735 ft to 405 ft; lat down well commander
sub and jars. Lay down directional tools. Unload radioactive sources. Download date from BPCM. Lay down
mud motor. Test MWD tool. Clean and clear rig floor. Remove wear bushing/flush out top drive with water.
July 27, 2013:
Test BOP’s. Pull test plug; install wear bushing and blow down choke manifold. PJSM with Weatherford; RU
power tongs and get all tools on floor to run 2-7/8” tubing. Run 30 joints of 2-7/8’ tubing from surface to 953 ft.
Rig down Weatherford tool and equipment. Rig service; grease blocks, crown, top drive. RIH from 957 ft to
7450 ft.
July 28, 2013:
Monitor well with trip tank while rigging up Schlumberger cementers. Rig up and pump cement plug. Trip from
10262 ft to 8566 ft. Pump nerf ball through pipe to clear pipe; circulate 186 bbl bottoms up. Monitor well on trip
tank with losses of 7.3 BPH. Wait on cement 8-10 hours; monitor well for losses. RIH from 8561 ft to 9200 ft.
Wash down from 9200 ft to 10271 ft. Build Baro-Seal pill; monitor well with trip tank. Pump 23 bbl of Baro-Seal
and chase with 30 bbl of mud. Monitor well with trip tank; build 80 lb per bbl of Baracarb pill. Pump 23 bbl of 80
lb per bbl Baracarb pill.
July 29, 2013:
Squeeze Baracarb pill. Monitor well with trip tank. Continue to squeeze Baracarb pill. Circulate bottoms up.
Monitor well with trip tank. Pumped 21 bbl of 20 lb per bbl Baracarb; chase with 105 bbl of 10.2 ppg mud.
POOH from 10263’ to 9500’. Squeeze 17.5 bbl of 80 lb per bbl pill. Hold 161 psi on back side while letting
seep into formation. Squeeze remaining 4 bbl of 80 lb per bbl pill. Hold 162 psi on back side while letting seep
into formation. RIH from 9509’ to 10263’. Monitor well with trip tank. PJSM with Schlumberger cementers:
Prepare to pump second cement job. Pump 1 bbl of H2O; pressure test lines to 3500 psi. Pump 10 bbl of 12.0
ppg mud push; pump 50 bbl 16.5 ppg cement. Pump 5 bbl 12.0 ppg mud push; displace with 83 bbl of mud.
Rig down cement equipment. POOH 30 stands.
SCU 12B-09
8
July 30, 2013:
Circulate surface to surface. Monitor well on trip tank. Wait on cement. Monitor well with trip tank for 15
minutes; zero losses. RIH to tag cement from 8379 ft to 8800 ft; wash from 8800 ft to 9300 ft, no tag. Circulate
bottoms up; signs of cement returns. Wash from 9300’ to 9500’. Circulate bottoms up; signs of cement returns.
POOH from 9500 ft to 9300 ft. Monitor well on trip tank for 15 minutes; zero losses. Wait on cement. Rig
service: greased draw works, top drive, brake linkage, crown, adjusted brake handle, checked oil, floor motor,
top drive, rotary table, gear-ends of mud pumps. Wait on cement. RIH from 9317 ft to 10002 ft. Condition mud
and circulate.
July 31, 2013:
POOH from 10002 ft to 757 ft. Well control drill while tripping. Rig down drill pipe handling equipment. Rig up
tubing equipment. Lay down 2-7/8” tubing from 757 ft to 400 ft. Repair brake linkage; service rig. Lay down 2-
7/8” tubing from 400 ft to surface. Rig down tubing equipment. PJSM: Pick up rotary BHA. Make up BHA and
begin to run in hole to 350 ft.
August 1, 2013:
Continue to run in hole from 350 ft to 9933 ft. Wash down from 9933 ft to 10006 ft. Drill/dress cement.
Condition mud and circulate. Pump dry job. POOH from 10020 ft to BHA. Lay down BHA. Rig up Weatherford,
change handling equipment. Rig up third party tubing equipment; hold PJSM; strap pipe. Run in hole with 2-
7/8” tubing from Surface to 799 ft. Rig down third party tools and prep floor to run in hole with drill pipe from
799 ft to 2620 ft.
August 2, 2013:
Circulate and reciprocate pipe at 10020 ft at 247 gpm, 1115 psi. Rig service. Rig up SLB to pump cement / mix
mud push; 12 lb. PJSM with all involved, batch and pump as per Schlumberger program. Schlumberger
displace cement with 87BBL 10.2 PPG mud. POOH from 10020 ft to 8400 ft. Condition mud and circulate;
drop wiper ball; brake circulation at 4 bpm; increase rate to 8 bpm; surface to surface with 10.2 PPG mud. Slip
and cut 78 ft drill line. Pump slug; POOH from 8400 ft to top of BHA at report time.
August 3, 2013:
Continue to POOH; lay down 2-7/8” tubing. With plug back complete and drill string on the bank, this
concludes SCU 12B-09 PB. Future drilling reverts back to the well name SCU 12B-09
August 2, 2013:
Circulate and reciprocate; GPM = 247; SPP = 1115. Rig service. R/U to pump cement / mix mud push; 12 lb.
PJSM with all involved, batch and pump as per Schlumberger program. Schlumberger displace cement with
87BBL 10.2 PPG mud. Trips; POOH from 10020’ to 8400’. Condition mud and circulate; drop wiper ball; brake
circulation @ 4 BBL/min; increase rate to 8 BBL/min; surface to surface with 10.2 PPG mud. Cut off drilling
line; slip and cut 78’. Pump slug; POOH from 8400’ to 7160’. POOH from 7160’ to 799’. S/M with Weatherford
hand and L/D 2 7/8” tubing. L/D 2 7/8” tubing from 799’-1’.
August 3, 2013:
R/D tubing equipment. Drain stack and pull wear bushing. S/M over pressure testing. Flush stack with fresh
water; install test plug; flush with fresh water through kill line and HCR line to poorboy degasser. R/U BOP test
equipment. Test BOP; annular 250/2500 PSI; test rams; choke; kill and string valves to 250-4000 PSI for 10
minutes each; all tests charted. Test BOP. Pull test plug; set wear ring; blow down choke manifold. Trips; P/U
BHA; load pipe rack with 17 JTS HWDP; strap. TIH from 313’ to 996’. Waiting on orders: one slip die came out
of bottom portion of DP slips when pulling slips during connection, resulting on die going down hole.
SCU 12B-09
9
August 4, 2013:
Safety meeting over gently POOH while pulling die up with BHA. Slowly POOH from 996’ to 20’. Fish slip die
out of BOP. Install wear bushing. TIH from 0’ to 996’. TIH from 996’ to 3600’. Trips; RIH from 3824’ to 9076’;
tag cement. Condition mud and circulate; brake circulation at 4 BBL; wash down to 9207; tag hard cement.
Drill hard cement at 9207’; WOB 2/4k; increase WOB 5/8k. Drill cement from 9500’ to 9843’; WOB 12.
Circulate, reciprocate, condition mud.
August 5, 2013:
Rig service. POOH from 9843’ to 6800’. TOOH; L/D BHA. Trips; P/U BHA L/D MWD; reprogram LWD.
Condition mud and circulate; shallow pulse test at 250’, 235 GPM, 5.5 BBL. Trips, CON-RIH. Rig service.
Trips, CON-RIH to 4649’. TIH from 4649’ to 9814’. Rig up gyro equipment; S/M. RIH with gyro.
August 6, 2013:
Orient gyro tool. Slide/drill cement from 9843’ to 9880’. Drill actual / slide drilling from 9880’ to 9889’. Deviation
survey; reinitiate gyro; and wire side entry sub pack off. Drill actual / slide drilling from 9889’ to 10,001’.
Deviation survey / gyro confirmation. Condition mud and circulate; work pipe while waiting on orders. Trips /
JSA to POOH, R/D wireline, gyro. Rig down wireline and gyro equipment.
August 7, 2013:
POOH from 9820’ to 149’. L/D subs; download data from MWD; check motor bearings; inspect bit. Adjust
degree of motor; M/U subs; M/U directional BHA. Trips; RIH with 2.1 degree motor (RIh slow). Drill actual,
slide drilling from 10001’ to 10072’ @ 250 GPM, 18/20K WOB. Slide from 10072’ to 10125’. Rotate from
10125’ to 10139’. Slide ahead.
August 8, 2013:
Slide from 10140’ to 10193’. Rotate from 10193’ to 10205’. Slide from 10205’ to 10230’. Rotate from 10230’ to
10245’. Slide from 10245’ to 10255’. Rig service. Slide from 10255’ to 10270’. Drill actual; slide drill from
10270’ to 10300’. Condition mud and circulate. Drop mud weight from 9.5 to 9.2 (in, out). Rig service; blocks
crown, top drive, draw tool, monitor well. Drill actual; slide drill from 10300’ to 10345’; back ream full stand @
43 RPM; 12/18K on bit.
August 9, 2013:
Rotate from 10396’ to 10446’. Slide from 10446’ to 10469’. Rotate from 10469’ to 10483’. Slide from 10483’ to
10487’. Rotate from 10487’ to 10500’. Rig service. Rotate from 10500’ to 10509’. Condition mud and circulate
and reciprocate. Trips; POOH from 10509’ to 9787’; flow check; monitor well (no flow). Condition mud and
circulate; pump dry job. Trips; continue POOH from 9787’ to MWD. Download MWD date; L/D directional tools.
Pull wear bushing; install test plug.
August 10, 2013:
Test BOPs. Set wear bushing. L/D test joint. P/U BHA; change motor bend to 1.2; download tools. Fire drill;
poor response; training in all alarms and drills. Continue directional BHA; load nuclear source; shallow pulse
test. RIH with 1.2 degree motor to 9772’. Cut and slip 92’ of drill line. Rig service. Re-log from 9850’ to 10509’
at 180 max ROP.
August 11, 2013:
Tight hole / wash down from 10349’ to 10409’. Directional work; MAD pass; W/R from 10409’ to 10509’. Drill
actual from 10509’ to 10557’. Slide from 10557’ to 10566’. Spot lube pill and reciprocate pipe. Slide from
10566’ to 10569’. Short trip 6 stands two times from 10569’ to 10221’.
August 12, 2013:
Circulate bottoms up; reciprocate pipe. POOH from 10569 to 7000’. Trips; TOOH from 7000’ to 292’.
Directional work; L/D BHA, unload nuke, DN link tools. Directional work; P/U new mud motor, orient, load
nukes. Condition mud and circulate; shallow pulse test (test good). Trips from surface to 2929’. Trips from
2929’ to 10569’; circulate B/U. Drill ahead.
SCU 12B-09
10
August 13, 2013:
Slide from 10568’ to 10588’. Rotate from 10588’ to 10593’. Hole taking mud; idle pump and send LCM down
hole. Rotate from 10593’ to 10599’. Slide from 10599’ to 10602’; drilling with partial returns. Lost returns; pump
LCM; build 30 lbs LCM in active; work to re-establish returns; reciprocate pipe. Condition mud and circulate;
lost circ; work pipe; spot pills on bottom; pump 30 BBL down backside. Condition mud and circulate; drop ball
shift well commander; break circulation; pump 20 BBL. Condition mud and circulate; break circulation @ 4
BBL, pump 2nd 80 lb BBL pill. Trips; stand back 2 stands while pill soaks. Condition mud and circulate; pump
down backside with holefill. Regain circulation; circulate bottoms up; 5910 units of wiper gas.
August 14, 2013:
Dropped ball to deactivate well commander. TIH 5 stands from 10341’ to 10585’; tag fill @ 10585’; wash down
to bottom from 10585’ to 10602’. Slide from 10602’ to 10620’. Drill from 10620’ to 10625’. Perform BOP drill
(well secured in 45 seconds). Drill from 10625’ to 10716’. Rig service. Drill from 10716’ to 10782’. Drill from
10782 to 10824’.
August 15, 2013:
Troubleshoot MWD; tool quit pulsing. Rig service; greased DW; check oil. Build a dry job and prep rig floor to
TOH. TOH from 10824’ to 9844’. Clean floor; pump dry job. TOH from 9844’ to 8041’. Bit hours = 14.1 hours.
TOH from 8041’ to directional tools. Unload radioactive sources/ L/W Monel; D/L data; P/U Monel; M/U new bit
scribe motor; upload data. Finish loading data; pull and clean filter; M/U Monel; S/M with MWD before loading
R/A sources; load R/A sources; surface test MWD tool. TIH from 349’ to 9000’; slip and cut 55’ drill line.
August 16, 2013:
Slip and cut 55’ of drill line. Rig service; greased TD, DW, blocks, swivel; checked oil in DW, gens, and MP.
TIH from 9015’ to 10000’. TIH from 10000’ to 10824’. Drill from 10824’ to 11029’. Lost circulation. Build LCM
pill; pump 20 BBL of LCM. Build and pump second LCM pill. TOH from 11029’ to 10967’; 2 stands of DP. Let
pill soak. Fill both sides of hole with 71 BBL of mud. Build 80 lb per BBL LCM pill; drop commander ball #1;
drop commander ball #2. TIH from 10967’ to 11029’; 2 stands of DP. Pump 80 lb per BBL LCM pill. TOH from
11029 to 10967’. Let 80 lb per BBL LCM pill soak; build volume. Try to fill hole with 77 BBL of mud. Build 110
lb per BBL LCM pill. Pump 22 BBL of pill and chase with 120 BBL. Wait on pill to soak.
August 17, 2013;
Try to fill back side with 75 BBL; no sign. Build 110 lb pr BBL LCM pill. Pump 19 BBL of 110 lb per BBL LCM
pill; chase with 120 BBL; RIH 1 stand of DP. TOH 7 stands from 11029’ to 10524’/ Let LCM pill soak in
formation; build mud volume and LCM pill. TIH from 10553’ to 11029’ Pump LCM pill and chase with 1300
strokes; had returns cut with oil; continue CBU; close bag; continue circulating through choke/gas buster
(surface to surface = 7500 strokes). Shut down pump; closed choke monitor for pressure. TOH 19 stands.
Monitor well with trip tank. Circulate surface to surface. Drop well commander ball to close up circulating sub;
dropped second ball to open circulating sub. Try to open well commander @ 3300 PSI with no luck. TOH from
9824’.
August 18, 2013;
Continue TOH. Directional work; break apart commander sub and lay out monels. S/M with LWD and rig crew
before unloading radioactive sources. Directional work; unload sources and down link MWD tool; drain motor;
break off bit. P/U test joint and remove wear bushing/flush through stack and lines. Conduct BOP tests. Install
wear bushing. P/U directional tools. S/M with rig crew and DD. Directional work; M/U bit motor scribe and
make up MWD. S/M with LWD and rig crew for radioactive sources. Directional work; load radioactive sources
and finish making up BHA and shallow test MWD. TIH from 175’.
SCU 12B-09
11
August 19, 2013;
Condition mud and circulate bottoms up. TIH from 10026’ to 10595’. Condition mud and circulate; wash ream
tight spot at 10603’. TIH from 10594’ to 11029’. Lose returns while TIH. Drill from 11029’ to 11036’. Build and
pump 23 BBL LCM pill and chase with 2229 strokes. TOH 2 stands. Let LCM pill soak; pumped 54 BBL on
back side; build volume. RIH from 10880’ to 11036’. Drill from 11036’ to 11067’. TOH from 11067’ to 10877’.
Pump 23 BBL of LCM pill and chase with 2200 strokes. Let LCM pill soak; build volume. Drop ball to open well
commander; drop second ball to isolate BHA. Total mud loss = 784 BBL. Pump 21 BBL of 80 lb per BBL LCM
pill; chase with 128 BBL. TOH from 10887’ to 10625’. Wait on LCM pill to soak into formation; build volume.
Pump 40 BBL down DP and 25 BBL down backside to try to fill hole. Build 80 lb per BBL LCM pill. Pump 25
BBL of 80 lb per BBL LCM pill; chase with 128 BBL. TOH from 10954’ to 10686’. Let pill soak into formation.
Pump 25 BBL down back side of hole and 45 BBL down DP; no returns.
August 20, 2013;
Build volume and 110 lb per BBL LCM pill. Work tight spot at 10781’. Pump 20 BBL of 110 lb per BBL LCM pill
and chase with 129 BBL; pressure reached 545 PSI. Let pill soak into formation; monitor well with trip tank.
Pump down back side with trip tank and down DP. Build volume and 110 lb per BBL LCM pill. Build volume
and 110 lb per BBL LCM pill. Drop ball to close well commander. RIH from 10628’ to 11067’. Drill from 11067’
to 11099’. Drop ball to open well commander; drop second ball to isolate BHA. Pump 21 BBL of 110 lb per
BBL LCM pill; chase with 2200 strokes. Let LCM pill soak; build volume. Rig service (function pipe rams 4
seconds). Continue to let LCM pill soak while building mud volume. Pump 22 BBL of 11 lb per BBL LCM pill;
chase with 2200 strokes. Let 110 lb per BBL LCM pill soak into formation. Pump 250 BBL down backside.
Build volume.
August 21, 2013;
Pump 75.5 BBL of 130 lb per BBL LCM pill. Received returns at 1681 strokes (97 BBL). Oil over shakers; shut
in well at 5300 units of gas read; Max gas 6460 units; record pressures; circulate through choke. Circulate
B/U. Monitor well. TOH 5 stands. Circulate gas out. Drop ball to close well commander. Troubleshoot MWD
tool. TOH from 10664’ to 9765’. Troubleshoot MWD tool. TIH from 9767’ to 11099’; bridge at 11004’; lost
circulation and returns. Build 3 120 lb per BBL LCM pill; monitor well from trip tank; pumped 50 BBL on
backside with no returns. Dropped ball #1; pressured up to 1183 PSI. Dropped ball #2; pressured up to 1583
PSI. Pump 47.7 BBL of 120 lb per BBL LCM pill; chase with 127.5 BBL.
August 22, 2013;
Pump 47.7 BBL of 120PPB LCM pill and chase with 127.5 BBL spot pill @ 10986'. Service rig and let pill soak
into formation. Pump 17 BBL down back side with no returns. Build volume and 130 PPB lcm pill. RIH from
9764' to 11064'. Drop ball to close well commander. Drill from 11099' to 11161'. Monitor well and build LCM
pills. Drop ball to open well commander and drop second ball to isolate BHA. Pump 60 BBL of 130 PPB LCM
pill and chase with 2200 strokes. TOOH from 11086' to 9766'. Let LCM pill soak into formation. TIH from 9766'
to 11161'. Start drilling from 11161'.
August 23, 2013;
Drilling ahead from 11161' to 11400' MD, circulate bottoms up, trip out of hole from 11400' to 10788', pump
100 BBL down backside, trip out of hole from 11788' to 9773', service rig and monitor well, slip and cut 156' of
drill line, continue to service rig, fill back side with 200 BBL, trip out of hole from 9767' to 2606', fill backside
with 450 BBL with no returns, trip out of hole and lay down bha and mwd tools.
August 24, 2013;
Pull wear bushing, install test plug and make up test equipment, test annular and choke to 250psi and
2500psi, rig down test plug and test joint, install wear bushing, pick up tools-scribe motor and load data, run in
hole to 11020', wash and ream from 11020' to 11069' and circulate out gas and oil, shut in well due to gas and
oil and monitor pressure through choke, open well and pull 3 stands to get out of tight hole, shut in well and
circulate through choke. Max gas last 24 hours 1193 units @ 11069'.
SCU 12B-09
12
August 25, 2013;
Pull out of hole to 10879, shut in well and circulate through choke, shut in well and monitor pressure up to
40psi and circulate through choke, circulate bottoms up and monitor well for gas, shut in well and circulate
surface to surface through choke, drop ball to open well commander and second ball to isolate BHA, run in
hole 2 stands, pump 65 BBL 100 lbs/BBL LCM and chase with 2110 strokes, pull out of hole from 11006' to
9769', fill hole to monitor well with 10 BBL every half hour pumped 75 BBL down back side with no returns and
continued to monitor well, pull out of hole from 9776' to 4968', monitored well for gas, pull out of hole from
4968' to 5984' at report time. Max gas last 24 hours 5172 units circulating @ 10877'.
August 26, 2013;
Pull out of hole from 5984' to 4968', monitor well for gas, pull out of hole from 4968' to 2155', monitor well for
gas, pull out of hole from 6155' to 200', lay down BHA and unload data sources, remove wear bushing, install
test plug, test BOP's, lay down test joint and fill stack with water, rig up to test blind rams, do draw down test
on accumulator, pull test plug and install wear bushing, blow down choke manifold and line up for hard shut in,
service rig, making up BHA at report time. Max gas last 24 hours 240 units.
August 27, 2013;
Trip in hole to 10170', circulate gas out through choke, shut in well and monitor casing pressure, open well and
circulate bottoms up, wash and ream from 10169' to 10390' taking 15Klbs WOB, work free and circulate, trip
out of hole to 10136' and circulate, wash and ream from 10166' to 10634' at report time. Max gas last 24 hours
2347 units.
August 28, 2013;
Wash and ream to 10768’, lost returns @ 10768’, build 75BBL 100lb/BBL LCM pill, drop ball to open well
commander and second ball to isolate BHA, pump 75 BBL LCM pill, back ream from 10730’ to 10700’ and pull
out of hole to 9820’, service top drive and draw works, set on pill and monitor well with trip tank (5 BBL/hr
average loss), establish circulation through well commander and drop ball to close well commander, circulate
through bit to confirm circulation, drop ball to open well commander, trip in hole from 9820’ to 10373’, tagged
bridge or ledge @ 10373’, circulate ream pump sweep and wash on top of trouble spot, wash and ream from
10373’ to 10650’ at report time. Max gas last 24 hours 1463 units @ 10630’.
August 29, 2013;
Wash and ream from 10630’ to 10690’, lost circulation @ 10690’ condition mud and build 75 lb/BBL LCM pill
drop ball to close well commander and isolate BHA, pump LCM pill, Pull up from 10703’ to inside shoe @
9768’, condition mud and circulate to keep hole full, monitor well and open well commander, work pipe @
9815’ and try to unplug well commander, service rig and top drive, fill and monitor well for 1 hour and refill
annulus with 147 BBL, build LCM pill and pump down back side, pull out of hole from 9815’ to 9489’ dry, pump
down drill pipe and establish circulation through well commander, fill hole and monitor well at rotary table, trip
in hole from 9489’ to 10383’, condition mud and circulate, break circulation while filling backside, pump 70 BBL
LCM slug, pull 19 stands and let LCM soak, cut and slip drill line, condition mud and circulate to clear LCM
from string and close well commander, monitoring well at 9470’ at report time. Max gas last 24 hours 169 units
@ 10690’.
August 30, 2013;
Monitor well @9470’, rig up test pump to shear well commander closing sleeve and pressured up to 4850 psi,
rig down test pump, pull out of hole from 9380’ to 96’, lay down directional tools (directional tools packed off
with LCM and cuttings, change bit service rig make up pick up and test MWD and directional tools, trip in hole
to 6960’, service rig and continue to trip in hole to 8823’ at report time. Max gas last 24 hours 75 units @
9470’.
SCU 12B-09
13
August 31, 2013;
Trip in hole from 8823’ to 9449’, change pop off valve on pump #2, run in hole from 9449’ to 10268’, service
rig, run in hole to 10328’ and started taking weight, wash and ream from 10328’ to 10610’, pump sweeps and
circulate until hole is clean, pump 45 BBL pill and displace out of pipe, pull out of hole from 10610’ to 9792’,
check flow, pull out of hole from 9792’ to 2578’ at report time. Max gas last 24 hours 521 units @ 10006’.
September 1, 2013;
Pull out of hole from 2578’ to surface and lay down BHA, check upper pipe rams remove wear bushing and
test lower pipe rams, install wear bushing, rig up casing equipment, pick up shoe track make up packers and
trip in hole with casing to 967’, make up liner hanger with wiper rubber attached, rig down casing tools trip in
hole 1000’ to 9122’ at report time. Max gas last 24 hours 53 units @ 9122’.
SCU 12B-09
14
3 GEOLOGICAL DATA
3.1 Lithostratigraphy
All tops were provided by Hilcorp geologist Kevin Eastham.
PROGNOSED OBSERVED
FORMATION MD
(ft)
TVD
(ft)
SSTVD
(ft)
MD
(ft)
TVD
(ft)
SSTVD
(ft)
Kick Off Point 9148 -9010 9831 9823 -9679
Tyonek G-1 10173 10134 -9990
Tyonek G2 10128 -9990 10225 10169 -10025
HKT 10216 -10078 10380 10250 -10106
Hemlock H2 10462 10280 -10136
Hemlock H3ST 10507 10306 -10162
Hemlock H4ST 10317 -10179 10597 10342 -10198
Hemlock H5ST 10646 10359 -10215
Hemlock H7ST 10390 -10252 10739 10389 -10245
Hemlock H10 10517 -10379 11246 10513 -10369
Hemlock H12 10668 -10530
TD 10806 -10668 11412 10535 -10391
SCU 12B-09
15
3.2 Lithologic Details
Tuffaceous Sand, Loose Sand (9840' - 9930') = 40-60% loose quartz sand and very light gray to grayish
white ashy/ tuffaceous sandstone; upper fine grain, occasional lower medium and lower fine grain;
subrounded; subdiscoidal; moderate to well sorted; poorly consolidated in very ashy/ weathered tuffaceous
matrix; dominantly a sublithic arenite, locally a lithic arenite, rarely grain supported noncalcareous; generally
whitish gray translucent quartz with occasional glass-like transparent volcanic glass clasts; trace mafic
minerals, greenstone at top of interval; dark gray to grayish black lithics increase to 30% of sample down
section; note occasional pebble fragments; note earthy organics, carbonaceous shale, lithic coal; NSOFC.
Sand, Tuffaceous Sand (9930' - 10000') = 40-60% loose sand; tuffaceous sandstone is very light gray to light
gray, grayish white; upper fine to lower fine grain; subrounded; subdiscoidal; well to moderate sorting; very soft
to friable in part; generally matrix supported with weathered tuff/ ash matrix; note decreased translucent and
transparent quartz, increased dark gray to grayish black lithics; note occasional grain supported sandstone;
NSOFC.
Tuffaceous Sandstone, Tuffaceous Siltstone (10000' - 10070') = very light gray to white with light gray
hues; very fine to coarse grain; moderate sphericity; subrounded to subangular; very poorly to poorly sorted;
poorly consolidated; generally 40-60% ash matrix supported, with translucent to opaque white to dark gray
quartz; occasional trace black lithics and minor conglomerate; increase in tuff at bottom of interval; NSOFC.
Tuffaceous Sandstone (10070' - 10120') = moderate gray to light gray with yellowish gray hues; upper very
fine to lower medium grain; subrounded to subangular; poorly consolidated; 50-60% clayey/ ashy matrix; 30-
40% translucent and opaque quartz; trace black lithics and minor conglomerate sand/conglomerate; loose
sand increases at bottom of interval.
Tuffaceous Sandstone (10120' - 10160') = very light gray to light gray; medium to fine grain; subangular;
poorly to moderately sorted; very poorly consolidated; 20-30% loose sand; minor conglomerate sand; NSOFC.
Tuffaceous Sandstone, Tuffaceous Siltstone, Carbonaceous Shale (10160' - 10260') = light gray to very
light gray; very fine to upper medium grain; subrounded to subangular; moderately sorted; poorly consolidated;
60-70% ash matrix supported; tuffaceous siltstone is medium gray to light gray; soft; pulverulent tenacity;
massive cuttings habits; silty to gritty; punky consistency; carbonaceous shale is brownish gray to brownish
black and interbedded from 10200' - 10220'; moderate outgassing; NO VISIBLE OIL STAIN; SLIGHT TO
MODERATE ODOR; 75-90% BRIGHT YELLOW SAMPLE FLUORESCENCE; IMMEDIATE BRIGHT
YELLOW TO MILKY WHITE FLUORESCENCE CUT; BRIGHT TO MODERATE YELLOW FLUORESCENCT
RING; NO VISUAL RESIDUE.
Sand, Conglomerate Sand (10260' - 10360') = light gray to grayish white, translucent and transparent quartz
grains; upper fine to lower coarse grain; subdiscoidal; subrounded to angular; unconsolidated; no matrix;
compositionally mature; 95% quartz; trace to minor tuffaceous sandstone and conglomerate; sand dominates
bottom of interval; NO VISIBLE OIL STAIN; VERY SLIGHT TO SLIGHT ODOR; 85% SAMPLE
FLUORESCENCE; MODERATE TO IMMEDIATE YELLOW MILKY CUT FLUORESCENCE; MODERATE TO
BRIGHT YELLOW FLUORESCENT RING; NO VISUAL RESIDUE.
Tuffaceous Siltstone (10360' - 10430') = medium light gray to light gray with medium gray hues; soft; poorly
indurated; stiff to pasty; wedge like cuttings habit; smooth to silty; waxy to greasy; minor tuff with trace
carbonaceous shale; claystone appears near end of interval; signs of good oil show increase as sand content
increases in interval; NO ODOR; NO VISIBLE OIL STAIN; 40-80% SAMPLE FLUORESCENCE; MODERATE
TO IMMEDIATE YELLOW TO YELLOW MILKY CUT FLUORESCENCE; MODERATE YELLOW
FLUORESCENT RING; NO VISUAL RESIDUE.
SCU 12B-09
16
Tuffaceous Claystone, Tuffaceous Sandstone (10430' - 10568') = very light gray, grayish white, light gray in
part; very fine grain; subrounded to rounded; subdiscoidal; well sorted; up to 15% loose quartz sand; balance
varies from an 'ash-stone' with varying amounts of well indurated quartz from 10-80%; non- calcareous; NO
STAIN OR ODOR; 40-90% BRIGHT YELLOW, BECOMING ORANGE TO YELLOW ORANGE
FLUORESCENCE AT THE BASE OF THE INTERVAL; IMMEDIATE MILKY TO WHITE BURST CUT WITH
OCCASIONAL STRONG STREAMING; BRIGHT MILKY FLUORESCENT RING; NO VISIBLE RESIDUE;
BASE OF UNIT HAS NO VISIBLE SOLVENT REACTON OR CUT; MILKY TO LIGHT YELLOW
FLUORESCENT RESIDUE RING; NO VISIBLE RESIDUE.
Tuffaceous Sand, Conglomeratic Sand, Tuff, Tuffaceous Claystone (10610' - 10740') = light gray to
grayish white, becoming light olive gray, increasing brownish hues; very fine to lower fine grain; subrounded to
rounded; subdiscoidal; well sorted in part; generally well indurated within ashy/ weathered tuff matrix; note
localized grain supported quartz sandstone with good visual porosity; note well developed coal at 10680';
FREE OIL AT POSSUM BELLY WELL MIXED WITH DRILLING FLUID; MODERATE HYDROCARBON
ODOR AT THE PITS; DRILLING MUD FLUORESCES BRIGHT YELLOW; NO VISIBLE STAIN; 30-100%
YELLOW TO ORANGE CUTTING FLUORESCENCE; IMMEDIATE BUT BARELY PERCEPTIBLE CLEAR TO
VERY LIGHT WHITE CUT WITH OCCASIONAL VERY LIGHT WHITE TO MILKY STREAM; BARELY
VISIBLE VERY LIGHT WHITE FLUORESCENT RING; NO VISIBLE RESIDUE.
Tuffaceous Siltstone, Tuff, Sand, Sandstone (10750' - 10810') = siltstone is medium dark gray to brownish
gray; friable; moderately indurated; dense to brittle; massive cuttings habit; gritty; some with coal laminations;
90% grain supported; white tuff has thin gray laminations and very fine quartz grains in part; note trace grain
supported sandstone; note trace sand; FREE OIL IN MUD; NO ODOR; 30-90% BRIGHT YELLOW SAMPLE
FLUORESCENCE; FAST TO IMMEDIATE MODERATE YELLOW TO BRIGHT YELLOW MILKY
FLUORESCENT CUT; MODERATE TO STRONG FLUORESCENT RING; NO VISIBLE RESIDUE.
Conglomeratic Sand, Loose Sand, Pebble Fragments (10810' - 10920') = dominantly unconsolidated/
disconsolidated sand and pebble fragments; upper fine to lower medium, occasionally upper medium grain;
subangular to subrounded; subprismoidal to subdiscoidal; fair to moderate sorting; locally abundant well
rounded subprismoidal pebble fragments with fresh high impact fracture; 60-80% grayish white, translucent,
rare transparent quartz; grayish black to dark gray lithics common, occasional reddish orange mafic minerals,
trace greenstone; NO VISIBLE OIL STAIN; VERY SLIGHT ODOR; 20% BRIGHT YELLOW, 50% AND
GREATER DULL ORANGE FLUORESCENCE EVENLY DISTRIBUTED THROUGHOUT SAMPLES;
IMMEDIATE BRIGHTENING WITH VERY LIGHT WHITE FLUORESCENT CUT; VERY FAST MILKY WHITE
STREAMERS; MODERATE TO STRONG MILKY FLUORESCENT RING; NO VISIBLE RESIDUE.
Conglomeratic Sand, Loose Sand, Ash/Tuff 10920' - 11017') = 80-90% loose sand, 20-10% ash/ weathered
tuff; upper fine to lower medium grain; subangular to subrounded; subdiscoidal to subprismoidal; occasional
well rounded subprismoidal pebble fragments with high impact fractured surfaces; ash/ weathered tuff is white
to grayish white with very little clastic component; NO STAIN; LIGHT ODOR; 90% DULL ORANGE/ 10%
BRIGHT YELLOW FLUORESCENCE; WATER IN PROCESSED SAMPLES FLUORESCES; IMMEDIATE
BRIGHTENING WITH BURST OF FLUORESCENT WHITE WHICH DISSIPAITES QUICKLY; BRIGHT
WHITE FLUORESCENT RING; NO VISISBLE RESIDUE.
SCU 12B-09
17
3.3 Connection Gases
50 units = 1% Methane Equivalent
Measured
Depth
(feet)
Subsea Total
Vertical Depth
(feet)
Gas over
background
(units)
Measured
Depth
(feet)
Subsea Total
Vertical Depth
(feet)
Gas over
background
(units)
10067 -9906 32 10715 -10238 14
10131 -9959 8 10778 -10257 18
10255 -10045 8 10872 -10280 26
10384 -10109 62 10936 -10294 22
10445 -10135 50
3.4 Trip Gases
50 units = 1% Methane Equivalent
Measured
Depth
(feet)
Subsea Total
Vertical Depth
(feet)
Trip to
(feet)
Maximum
Gas
(Units)
Pumps Off
Time
(hours)
10001 -9846 Surface Bit Trip 47 23
10168 -9986 Surface Bit Trip 3863 39.1
10193 -10004 Surface Bit Trip 521 48.1
10416 -10123 Surface Bit Trip 2347 50.8
10509 -10162 Surface Bit Trip 624 35.2
10541 -10176 Surface Bit Trip 1757 54.5
10558 -10183 Surface Bit Trip 544 24.8
10824 -10269 Surface Bit Trip 237 27.1
11029 -10313 10524 6668 13.5
11099 -10327 10664 6460 25.5
10879 -10282 Surface Bit Trip 5172 37.5
SCU 12B-09
18
3.5 Sampling Program / Sample Dispatch
Set Type / Purpose Frequency* Interval Dispatched to
A Washed and dried
reference samples
30 ft
10 ft
9840 ft – 9990 ft
9990 ft – 11020 ft
Hilcorp Alaska LLC
3800 Centerpoint Drive
Suite #100
Anchorage AK 99503
Attn.: Debra Oudean
(907) 777-8337
B Washed and dried
reference samples
30 ft
10 ft
9840 ft – 9990 ft
9990 ft – 11020 ft
Hilcorp Alaska LLC
3800 Centerpoint Drive
Suite #100
Anchorage AK 99503
Attn.: Debra Oudean
(907) 777-8337
C
Wet unprocessed
samples for Canrig
Quality Control analysis
10 ft 9990 ft – 11020 ft
Canrig Drilling Technology
1615 Jefferson Island Road
New Iberia LA 70560
Attn.: Geoff Davison
(337) 380-5298
D
Drilling Mud Samples
samples for Canrig
Quality Control analysis
50 ft 9990 ft – 11020 ft
Canrig Drilling Technology
1615 Jefferson Island Road
New Iberia LA 70560
Attn.: Geoff Davison
(337) 380-5298
• Sample frequency may be locally altered according to drill rate constraints and zones of interest.
SCU 12B-09
19
4 DRILLING DATA
4.1 Directional Survey Data
Measured
Depth
(ft)
Inc.
(o)
Azi.
(o)
True
Vertical
Depth (ft)
Northing
(ft)
Easting
(ft)
Vertical
Section
(ft)
Dogleg
Rate
(o/100ft)
0 0 293.4 0 0 0 0 0
17.5 0 293.4 17.5 0 0 0 0
100 0.48 293.4 100 0.14 -0.32 0.31 0.58
200 0.45 300.14 200 0.50 -1.04 1.06 0.06
300 0.32 276.45 299.99 0.73 -1.66 1.63 0.20
400 0.33 259.22 399.99 0.71 -2.22 1.98 0.10
500 0.31 241.43 499.99 0.52 -2.74 2.18 0.10
600 0.23 213.65 599.99 0.23 -3.09 2.18 0.15
700 0.18 198.67 699.99 -0.09 -3.25 2.04 0.07
800 0.17 182.47 799.99 -0.39 -3.31 1.86 0.05
900 0.19 164.82 899.99 -0.69 -3.27 1.60 0.06
1000 0.06 154.37 999.99 -0.90 -3.20 1.40 0.13
1100 0.06 243.94 1099.99 -0.97 -3.23 1.36 0.08
1200 0.06 232.82 1199.99 -1.03 -3.32 1.38 0.01
1300 0.14 250.31 1299.99 -1.10 -3.47 1.42 0.08
1400 0.28 264.64 1399.99 -1.16 -3.83 1.61 0.15
1500 0.30 255.74 1499.99 -1.25 -4.33 1.86 0.05
1600 0.33 257.62 1599.98 -1.38 -4.86 2.11 0.03
1700 0.33 254.55 1699.98 -1.51 -5.42 2.37 0.02
1800 0.33 256.32 1799.98 -1.66 -5.98 2.63 0.01
1900 0.36 255.33 1899.98 -1.81 -6.56 2.89 0.03
2000 0.32 189.19 1999.98 -2.16 -6.91 2.85 0.37
2100 0.48 156.56 2099.97 -2.82 -6.79 2.27 0.27
2200 0.22 228.36 2199.97 -3.33 -6.77 1.86 0.46
2300 0.46 265.69 2299.97 -3.49 -7.31 2.10 0.31
2400 0.60 269.97 2399.97 -3.52 -8.23 2.67 0.15
2500 1.07 263.12 2499.96 -3.63 -9.68 3.53 0.48
2600 1.32 256.29 2599.93 -4.02 -11.73 4.57 0.29
2700 1.38 259.76 2699.91 -4.51 -14.03 5.70 0.10
2800 2.02 254.19 2799.86 -5.20 -16.92 7.04 0.66
2900 2.28 260.02 2899.79 -6.03 -20.57 8.79 0.34
3000 2.71 269.46 2999.70 -6.39 -24.89 11.32 0.59
3100 2.85 270.18 3099.58 -6.41 -29.74 14.46 0.14
3200 3.17 268.83 3199.44 -6.46 -34.99 17.84 0.33
3300 3.53 270.81 3299.27 -6.47 -40.84 21.63 0.38
3400 4.22 275.83 3399.04 -6.05 -47.57 26.32 0.77
3500 4.43 275.88 3498.76 -5.28 -55.08 31.78 0.21
3600 4.18 281.06 3598.48 -4.19 -62.50 37.44 0.46
SCU 12B-09
20
Surveys (Continued)
Measured
Depth
(ft)
Inc.
(o)
Azi.
(o)
True
Vertical
Depth (ft)
Northing
(ft)
Easting
(ft)
Vertical
Section
(ft)
Dogleg
Rate
(o/100ft)
3700 3.75 289.2 3698.24 -2.41 -69.16 43.12 0.71
3800 3.75 296.24 3798.02 0.11 -75.18 48.95 0.46
3900 4.05 301.72 3897.79 3.41 -81.12 55.32 0.48
4000 4.25 303.27 3997.53 7.30 -87.22 62.24 0.23
4100 4.37 306.23 4097.25 11.58 -93.39 69.51 0.25
4200 4.24 308.45 4196.96 16.14 -99.36 76.84 0.21
4300 3.83 312.66 4296.72 20.70 -104.71 83.79 0.51
4400 3.50 310.25 4396.51 24.93 -109.50 90.12 0.36
4500 3.32 307.89 4496.33 28.68 -114.11 95.97 0.23
4600 3.24 306.27 4596.17 32.13 -118.68 101.56 0.12
4700 2.93 305.87 4696.03 35.30 -123.03 106.79 0.31
4800 2.42 301.19 4795.92 37.89 -126.90 111.28 0.55
4900 2.22 301.87 4895.83 40.01 -130.35 115.13 0.20
5000 1.99 308.06 4995.77 42.10 -133.37 118.68 0.32
5100 1.93 310.45 5095.71 44.27 -136.01 122.04 0.10
5200 1.95 313.09 5195.65 46.52 -138.54 125.40 0.09
5300 1.81 326.87 5295.60 49.01 -140.64 128.66 0.47
5400 1.74 332.95 5395.55 51.68 -142.20 131.70 0.20
5500 1.72 335.04 5495.50 54.39 -143.52 134.62 0.07
5600 1.71 339.98 5595.46 57.16 -144.67 137.46 0.15
5700 1.64 345.10 5695.42 59.94 -145.54 140.15 0.17
5800 1.67 347.18 5795.38 62.74 -146.24 142.73 0.07
5900 1.59 338.01 5895.34 65.45 -147.08 145.34 0.27
6000 1.52 332.45 5995.30 67.91 -148.21 147.94 0.17
6100 1.60 308.78 6095.26 69.96 -149.91 150.61 0.64
6200 1.90 309.79 6195.22 71.90 -152.27 153.61 0.30
6300 2.09 309.60 6295.16 74.12 -154.95 157.04 0.19
6400 3.62 312.39 6395.03 77.41 -158.69 161.97 1.54
6500 3.62 312.32 6494.83 81.67 -163.36 168.24 0.00
6600 4.03 328.10 6594.61 86.78 -167.55 174.85 1.13
6700 4.13 331.49 6694.36 92.92 -171.12 181.84 0.26
6800 4.05 332.54 6794.10 99.22 -174.47 188.80 0.11
6900 3.54 330.76 6893.88 105.05 -177.61 195.27 0.52
7000 2.95 325.16 6993.72 109.85 -180.59 200.86 0.67
7100 2.42 317.70 7093.61 113.53 -183.48 205.53 0.63
7200 2.44 317.12 7193.52 116.65 -186.35 209.77 0.03
7300 2.49 318.47 7293.43 119.84 -189.23 214.07 0.08
7400 2.50 320.56 7393.33 123.15 -192.06 218.42 0.09
7500 2.55 321.57 7493.24 126.57 -194.83 222.82 0.07
7600 2.46 325.07 7593.14 130.07 -197.44 227.18 0.18
7700 2.06 323.71 7693.06 133.28 -199.73 231.11 0.40
SCU 12B-09
21
Surveys (Continued)
Measured
Depth
(ft)
Inc.
(o)
Azi.
(o)
True
Vertical
Depth (ft)
Northing
(ft)
Easting
(ft)
Vertical
Section
(ft)
Dogleg
Rate
(o/100ft)
7800 1.72 319.61 7793.01 135.87 -201.77 234.40 0.37
7900 1.51 329.07 7892.97 138.15 -203.42 237.20 0.34
8000 1.50 337.69 7992.93 140.49 -204.59 239.74 0.23
8100 1.27 342.29 8092.90 142.76 -205.43 242.01 0.26
8200 1.23 332.61 8192.88 144.76 -206.26 244.08 0.21
8300 1.33 333.88 8292.86 146.76 -207.26 246.24 0.10
8400 1.41 333.74 8392.83 148.90 -208.32 248.56 0.08
8500 1.50 333.82 8492.8 151.18 -209.44 251.02 0.09
8600 1.33 328.19 8592.76 153.34 -210.63 253.44 0.22
8700 1.19 309.44 8692.74 154.99 -212.04 255.61 0.43
8800 1.21 312.08 8792.72 156.36 -213.63 257.68 0.06
8900 1.32 325.34 8892.70 158.01 -215.07 259.87 0.31
9000 1.47 329.45 8992.67 160.06 -216.37 262.28 0.18
9100 1.35 336.00 9092.64 162.24 -217.50 264.67 0.20
9200 1.23 338.26 9192.61 164.32 -218.38 266.81 0.13
9300 1.41 342.1 9292.58 166.49 -219.16 268.97 0.20
9400 1.37 334.25 9392.55 168.73 -220.05 271.26 0.19
9500 1.05 324.64 9492.53 170.56 -221.10 273.33 0.38
9600 0.94 315.15 9592.52 171.89 -222.21 275.06 0.20
9700 1.00 307.86 9692.50 173.00 -223.48 276.73 0.14
9760 1.34 295.07 9752.49 173.62 -224.53 277.88 0.71
ti 9813.65 1.00 292.00 9806.13 174.06 -225.53 278.87 0.64
9830 1.05 289.93 9822.48 174.17 -225.80 279.13 0.39
9856 4.51 299.71 9848.44 174.76 -226.92 280.30 13.38
9888 7.53 300.97 9880.26 176.46 -229.81 283.47 9.45
9903 8.79 308.30 9895.11 177.67 -231.55 285.53 10.88
9940 11.65 320.15 9931.52 182.30 -236.16 292.04 9.56
9990 17.74 320.33 9979.86 192.04 -244.27 304.71 12.18
10014 21.46 318.57 10002.47 198.15 -249.51 312.76 15.69
10053 27.97 319.12 10037.88 210.43 -260.23 329.06 16.7
10077 31.53 321.75 10058.71 219.62 -267.80 340.96 15.8
10112 36.75 321.24 10087.67 234.98 -280.03 360.58 14.94
10141 39.67 321.02 10110.46 248.94 -291.29 378.51 10.08
10175 44.90 319.76 10135.60 266.55 -305.87 401.38 15.58
10204 47.44 319.39 10155.68 282.47 -319.44 422.30 8.81
10241 50.51 319.95 10179.97 303.75 -337.50 450.20 8.38
10267 53.15 321.70 10196.03 319.60 -350.41 470.64 11.45
10302 58.47 321.02 10215.69 342.20 -368.48 499.56 15.28
10331 62.77 320.22 10229.92 361.73 -384.51 524.82 15.02
10349 64.18 319.55 10237.96 374.04 -394.89 540.92 8.51
10412 64.89 320.45 10265.04 417.62 -431.45 597.80 1.71
SCU 12B-09
22
Surveys (Continued)
Measured
Depth
(ft)
Inc.
(o)
Azi.
(o)
True
Vertical
Depth (ft)
Northing
(ft)
Easting
(ft)
Vertical
Section
(ft)
Dogleg
Rate
(o/100ft)
10453 64.80 321.09 10282.47 446.36 -454.92 634.90 1.43
10475 64.73 321.75 10291.85 461.92 -467.33 654.79 2.73
10507 64.77 320.83 10305.50 484.50 -485.43 683.72 2.60
10537 64.88 321.53 10318.26 505.66 -502.45 710.86 2.14
10602 68.99 324.03 10343.73 553.28 -538.60 770.54 7.25
10662 69.97 325.09 10364.76 599.06 -571.18 826.51 2.32
10725 72.06 324.80 10385.25 647.82 -605.39 885.81 3.35
10787 73.65 326.84 10403.53 696.83 -638.67 944.68 4.06
10851 77.08 325.30 10419.70 748.20 -673.23 1006.18 5.84
10914 78.21 325.76 10433.18 798.93 -708.06 1067.38 1.93
10453 64.80 321.09 10282.47 446.36 -454.92 634.90 1.43
10475 64.73 321.75 10291.85 461.92 -467.33 654.79 2.73
10507 64.77 320.83 10305.50 484.50 -485.43 683.72 2.60
10537 64.88 321.53 10318.26 505.66 -502.45 710.86 2.14
10602 68.99 324.03 10343.73 553.28 -538.60 770.54 7.25
10662 69.97 325.09 10364.76 599.06 -571.18 826.51 2.32
10725 72.06 324.80 10385.25 647.82 -605.39 885.81 3.35
10787 73.65 326.84 10403.53 696.83 -638.67 944.68 4.06
10851 77.08 325.30 10419.70 748.20 -673.23 1006.18 5.84
10914 78.21 325.76 10433.18 798.93 -708.06 1067.38 1.93
SC
U
1
2
B
-
0
9
23
4.
2
B
i
t
R
e
c
o
r
d
Bi
t
S
i
z
e
M
a
k
e
Ty
p
e
SN
Je
t
s
TF
A
De
p
t
h
In
De
p
t
h
Ou
t
Fo
o
t
a
g
e
Dr
i
l
l
e
d
Bi
t
Ho
u
r
s
Av
g
.
RO
P
(f
t
/
h
r
)
Av
g
.
WO
B
(kl
b
s
)
Av
g
.
RP
M
Av
g
.
PP
(p
s
i
)
Grade
1
6
”
H
C
C
ST
X
-
1
52
2
4
8
9
7
3x
2
0
0.
9
2
0
4
98
3
1
9
8
4
3
1
2
0
.
2
6
4
.
9
1
2
.
3
4
4
.
4
1
8
6
8
1
-
1
-
A
-
I
-
N
-
S
E
-
B
H
A
2
6
”
H
C
C
MX
-
1
8
H
D
X
52
1
7
2
2
4
3X
1
4
0.
4
5
1
0
98
4
3
1
0
0
0
1
1
5
8
7
.
7
3
3
.
2
1
4
.
3
0
.
3
1
9
8
6
2R
R
6
”
H
C
C
MX
-
1
8
H
D
X
52
1
7
2
2
4
3x
1
4
0.
4
5
1
0
10
0
0
1
1
0
5
0
9
5
0
8
2
4
.
7
7
0
.
6
1
8
.
1
1
5
.
4
18
0
3
6
-
6
-
W
T
-
A
-
E
-
I
-
E
R
-
H
R
3
6
”
HC
C
#5
DP
5
0
5
F
X
71
3
7
5
7
0
5x
1
1
0.
4
6
4
0
10
5
0
9
1
0
5
6
9
2
2
0
4
.
0
4
0
.
5
7
.
5
2
4
.
1
16
5
2
1
-
1
-
W
T
-
A
-
X
-
I
-
B
T
-
B
H
A
4
6
”
HC
C
#6
MX
-
1
8
H
D
X
52
1
7
2
2
5
3x
1
4
0.
4
5
1
0
10
5
6
9
1
0
8
2
4
2
5
5
1
4
.
3
2
5
.
3
1
6
.
9
2
8
.
8
17
9
8
1
-
1
-
W
T
-
A
-
E
-
I
-
E
R
-
D
T
F
5
6
”
HC
C
#7
MX
-
1
8
H
D
X
52
1
7
1
7
7
3x
1
4
0.
4
5
1
0
10
8
2
4
1
1
0
2
9
2
0
5
6
.
7
4
3
.
6
1
9
.
5
4
5
.
7
2
1
8
1
1
-
1
-
W
T
-
A
-
E
-
I
6
6
”
HC
C
#8
DP
5
0
5
F
X
70
3
4
9
6
5
5x
1
1
0.
4
6
4
0
11
0
2
9
1
1
4
1
2
3
7
1
’
2
.
4
5
2
7
9
.
7
8
.
7
5
0
.
1
1
8
2
0
6R
R
1
6
”
HC
C
#8
DP
5
0
5
F
X
70
3
4
9
6
5
5x
1
1
0.
4
6
4
0
11
4
1
2
1
1
4
1
2
0
0
0
0
0
0
1
-
1
-
W
T
-
A
-
X
-
I
-
B
T
-
B
H
A
7R
R
1
6
”
HC
C
#7
MX
-
1
8
H
D
X
52
1
7
1
7
7
3x
1
4
0.
4
5
1
0
11
4
1
2
1
1
4
1
2
0
0
0
0
0
0
1
-
1
-
W
T
-
A
-
E
-
I
3R
R
2
6
”
H
C
C
ST
X
-
1
52
2
4
8
9
7
3x
2
0
0.
9
2
0
4
11
4
1
2
1
1
4
1
2
0
0
0
0
0
0
1
-
1
-
N
O
-
A
-
1
-
I
-
N
O
-
B
H
A
SC
U
1
2
B
-
0
9
24
4.
3
Mu
d
R
e
c
o
r
d
Co
n
t
r
a
c
t
o
r
:
B
a
r
o
i
d
Mu
d
T
y
p
e
:
E
Z
M
u
d
6
%
K
C
l
Da
t
e
De
p
t
h
(f
t
)
MW
(p
p
g
)
VI
S
(s
/
q
t
)
PV
Y
P
G
e
l
s
FL
(c
c
)
So
l
s
(%
)
O/
W
Ra
t
i
o
Sd
(%
)
MB
T
(p
p
b
eq
.
)
pH
Al
k
(P
m
)
Cl (mg/L) Ca (mg/L)
07
/
1
3
/
2
0
1
3
9
8
5
0
1
0
.
3
0
5
4
1
4
1
9
6
/
7
/
8
4
.
1
7
.
0
0
.
0
/
9
0
.
2
-
1
.
0
9
.
4
0
.
4
0
3
5
0
0
0
2
0
0
07
/
1
4
/
2
0
1
3
9
8
5
0
1
0
.
5
0
5
2
1
3
1
7
4
/
5
/
6
3
.
6
7
.
5
0
.
0
/
8
9
.
6
-
1
.
0
8
.
9
0
.
2
0
3
6
5
0
0
8
0
07
/
1
5
/
2
0
1
3
9
8
5
0
1
0
.
4
0
4
9
1
1
1
5
4
/
5
/
6
3
.
9
7
.
1
0
.
0
/
9
0
.
1
-
1
.
0
8
.
9
0
.
2
0
3
5
0
0
0
8
0
07
/
1
6
/
2
0
1
3
9
8
5
3
1
0
.
5
0
4
7
1
3
1
8
5
/
6
/
7
4
.
1
7
.
7
0
.
0
/
8
9
.
8
-
1
.
0
9
.
0
0
.
2
0
3
2
0
0
0
2
0
0
07
/
1
7
/
2
0
1
3
9
8
7
0
1
0
.
5
0
5
3
8
2
5
5
/
6
/
7
4
.
0
7
.
7
0
.
0
/
8
9
.
8
-
1
.
0
9
.
2
0
.
3
8
3
2
0
0
0
1
4
0
07
/
1
8
/
2
0
1
3
9
8
7
0
1
0
.
5
8
5
9
1
3
2
1
5
/
6
/
7
4
.
0
8
.
1
0
.
0
/
8
9
.
4
-
1
.
0
8
.
9
0
.
2
0
3
2
0
0
0
1
4
0
07
/
1
9
/
2
0
1
3
9
8
7
0
1
0
.
5
0
4
9
1
1
1
7
5
/
6
/
7
4
.
0
7
.
9
0
.
0
/
8
9
.
8
-
1
.
0
9
.
0
0
.
2
5
3
0
0
0
0
1
4
0
07
/
2
0
/
2
0
1
3
9
8
7
0
1
0
.
6
0
5
3
1
3
1
9
5
/
6
/
7
3
.
9
8
.
1
0
.
0
/
8
9
.
5
-
1
.
0
8
.
9
0
.
2
0
3
0
5
0
0
1
6
0
07
/
2
1
/
2
0
1
3
1
0
0
8
4
1
0
.
4
3
4
9
1
5
1
9
5
/
7
/
8
3
.
8
7
.
6
0
.
0
/
9
0
.
0
-
1
.
0
9
.
4
0
.
4
0
3
1
0
0
0
1
2
0
07
/
2
2
/
2
0
1
3
1
0
1
0
2
1
0
.
4
2
4
8
1
4
1
9
5
/
6
/
7
3
.
8
7
.
5
0
.
0
/
9
0
.
1
0
.
1
0
1
.
0
9
.
8
0
.
5
5
3
1
0
0
0
1
6
0
07
/
2
3
/
2
0
1
3
1
0
2
6
3
1
0
.
4
0
4
9
1
4
2
0
5
/
6
/
7
4
.
5
7
.
4
0
.
0
/
9
0
.
2
0
.
1
0
1
.
0
9
.
3
0
.
4
5
3
1
0
0
0
1
6
0
07
/
2
4
/
2
0
1
3
1
0
2
7
1
1
0
.
1
5
5
2
1
3
1
6
5
/
6
/
7
4
.
5
6
.
5
0
.
0
/
9
1
.
0
0
.
1
0
1
.
0
9
.
3
0
.
4
5
3
1
0
0
0
1
6
0
07
/
2
5
/
2
0
1
3
1
0
2
7
1
1
0
.
2
0
5
0
1
4
1
5
5
/
6
/
7
5
.
0
6
.
7
0
.
0
/
9
0
.
8
0
.
1
0
1
.
0
8
.
2
0
.
1
0
3
2
0
0
0
1
6
0
07
/
2
6
/
2
0
1
3
1
0
2
7
1
1
0
.
2
5
6
1
1
3
1
5
5
/
6
/
7
3
.
8
6
.
6
0
.
0
/
9
0
.
8
0
.
1
0
1
.
0
8
.
0
0
.
5
0
3
3
0
0
0
2
4
0
07
/
2
7
/
2
0
1
3
1
0
2
7
1
1
0
.
2
0
4
9
1
3
1
6
6
/
7
/
8
4
.
6
6
.
5
0
.
0
/
9
1
.
0
0
.
1
0
1
.
0
8
.
9
0
.
3
0
3
2
0
0
0
2
4
0
07
/
2
8
/
2
0
1
3
1
0
2
7
1
1
0
.
2
0
5
3
1
1
1
8
7
/
8
/
9
4
.
6
6
.
5
0
.
0
/
9
1
.
0
0
.
1
0
1
.
0
8
.
9
0
.
3
0
3
2
0
0
0
4
0
0
07
/
2
9
/
2
0
1
3
1
0
2
7
1
1
0
.
2
0
4
8
1
0
1
7
6
/
7
/
8
4
.
8
6
.
6
0
.
0
/
9
1
.
0
0
.
1
0
1
.
0
8
.
9
0
.
3
0
3
0
0
0
0
2
0
0
07
/
3
0
/
2
0
1
3
1
2
0
7
1
1
0
.
2
0
4
5
1
0
1
8
6
/
7
/
8
4
.
8
6
.
6
0
.
0
/
9
1
.
0
0
.
1
0
1
.
0
1
0
.
2
0
.
3
0
3
0
0
0
0
6
0
0
07
/
3
1
/
2
0
1
3
1
0
2
7
1
1
0
.
2
5
4
8
1
2
2
3
8
/
9
/
1
0
6
.
7
6
.
4
0
.
0
/
9
1
.
0
0
.
1
0
1
.
0
1
0
.
1
2
.
1
0
3
3
0
0
0
8
0
0
08
/
0
1
/
2
0
1
3
1
0
0
2
6
1
0
.
2
5
5
2
1
5
2
4
8
/
1
0
/
1
1
5
.
6
6
.
6
0
.
0
/
9
0
.
8
-
1
.
0
9
.
7
2
.
0
0
3
3
0
0
0
8
0
0
08
/
0
2
/
2
0
1
3
1
0
0
2
6
1
0
.
3
0
5
0
1
3
2
2
8
/
1
0
/
1
2
5
.
8
7
.
0
0
.
0
/
9
0
.
6
-
1
.
0
1
0
.
3
2
.
2
0
3
0
0
0
0
5
6
0
Ab
b
r
e
v
i
a
t
i
o
n
s
MW
=
M
u
d
W
e
i
g
h
t
V
I
S
=
F
u
n
n
e
l
V
i
s
c
o
s
i
t
y
P
V
=
P
l
a
s
t
i
c
V
i
s
c
o
s
i
t
y
Y
P
=
Y
i
e
l
d
P
o
i
n
t
Ge
l
s
=
G
e
l
S
t
r
e
n
g
t
h
F
L
=
F
i
l
t
r
a
t
e
L
o
ss
F
C
=
F
i
l
t
e
r
C
a
k
e
S
o
l
s
=
S
o
l
i
d
s
O/
W
=
O
i
l
t
o
W
a
t
e
r
r
a
t
i
o
S
d
=
S
a
n
d
c
o
n
t
e
n
t
C
l
=
C
h
l
o
r
i
d
e
s
C
a
=
H
a
r
d
n
e
s
s
SC
U
1
2
B
-
0
9
25
Co
n
t
r
a
c
t
o
r
:
B
a
r
o
i
d
Mu
d
T
y
p
e
:
E
Z
M
u
d
6
%
K
C
l
Da
t
e
De
p
t
h
(f
t
)
MW
(p
p
g
)
VI
S
(s
/
q
t
)
PV
Y
P
G
e
l
s
FL
(c
c
)
So
l
s
(%
)
O/
W
Ra
t
i
o
Sd
(%
)
MB
T
(p
p
b
eq
.
)
pH
Al
k
(P
m
)
Cl (mg/L) Ca (mg/L)
08
/
0
3
/
2
0
1
3
1
0
0
2
6
1
0
.
3
0
4
7
1
0
2
0
6
/
8
/
1
1
7
.
0
6
.
9
0
.
0
/
9
0
.
6
-
1
.
0
1
1
.
0
2
.
5
0
3
2
0
0
0
1
6
0
0
08
/
0
4
/
2
0
1
3
9
8
3
2
1
.
0
0
4
6
1
1
1
7
6
/
8
/
1
0
8
.
4
6
.
1
0
.
0
/
9
1
.
7
-
1
.
0
1
1
.
4
3
.
0
0
2
7
5
0
0
2
4
0
0
08
/
0
5
/
2
0
1
3
9
8
4
3
9
.
9
0
4
5
1
2
1
8
5
/
7
/
9
6
.
0
5
.
5
0
.
0
/
9
2
.
0
-
1
.
0
9
.
6
0
.
6
0
3
1
0
0
0
3
2
0
0
08
/
0
6
/
2
0
1
3
1
0
0
0
1
9
.
7
0
4
6
1
1
1
6
5
/
7
/
8
5
.
8
4
.
6
0
.
0
/
9
3
.
0
-
1
.
0
8
.
7
0
.
5
0
2
9
0
0
0
3
2
0
0
08
/
0
7
/
2
0
1
3
1
0
1
4
4
9
.
7
0
4
4
1
1
1
5
5
/
6
/
7
4
.
6
4
.
9
0
.
0
/
9
2
.
7
-
1
.
0
8
.
7
1
.
5
0
3
0
0
0
0
3
4
5
0
08
/
0
8
/
2
0
1
3
1
0
4
4
0
9
.
2
5
5
0
1
2
1
6
4
/
5
/
6
3
.
8
2
.
9
0
.
0
/
9
4
.
6
-
1
.
0
9
.
5
1
.
7
0
3
0
5
0
0
2
4
0
0
08
/
0
9
/
2
0
1
3
1
0
5
0
9
9
.
2
0
4
4
9
2
0
6
/
7
/
8
3
.
9
2
.
9
0
.
0
/
9
4
.
6
-
1
.
0
9
.
2
1
.
9
5
3
0
0
0
0
2
5
6
0
08
/
1
0
/
2
0
1
3
1
0
5
0
9
9
.
2
0
4
2
1
0
1
5
4
/
5
/
6
4
.
2
3
.
0
0
.
0
/
9
4
.
6
-
1
.
0
8
.
9
1
.
9
0
2
9
5
0
0
2
4
0
0
08
/
1
1
/
2
0
1
3
1
0
5
6
9
9
.
2
0
4
3
8
2
0
5
/
7
/
8
4
.
4
3
.
1
0
.
0
/
9
4
.
5
-
1
.
0
8
.
6
1
.
0
0
2
9
0
0
0
2
6
0
0
08
/
1
2
/
2
0
1
3
1
0
5
7
0
9
.
2
5
4
0
8
1
6
4
/
5
/
6
4
.
8
3
.
4
0
.
0
/
9
4
.
2
-
1
.
0
8
.
7
1
.
3
0
2
9
5
0
0
2
4
0
0
08
/
1
3
/
2
0
1
3
1
0
5
7
0
9
.
3
5
4
1
1
2
1
6
5
/
6
/
7
4
.
9
4
.
0
0
.
0
/
9
3
.
6
-
1
.
0
8
.
7
1
.
0
0
3
0
0
0
0
2
2
0
0
08
/
1
4
/
2
0
1
3
1
0
8
2
3
9
.
3
2
3
8
9
1
9
4
/
5
/
6
5
.
0
3
.
9
0
.
0
/
9
3
.
8
-
1
.
0
8
.
4
0
.
4
0
2
8
5
0
0
2
0
0
0
08
/
1
5
/
2
0
1
3
1
0
8
2
3
9
.
4
5
4
0
8
1
6
5
/
6
/
7
4
.
7
4
.
2
0
.
0
/
9
3
.
2
-
1
.
0
8
.
6
0
.
3
0
3
1
5
0
0
2
0
0
0
08
/
1
6
/
2
0
1
3
1
1
0
2
9
9
.
2
5
3
9
7
1
7
5
/
7
/
8
4
.
9
3
.
6
0
.
0
/
9
4
.
0
-
1
.
0
8
.
7
0
.
2
5
2
9
5
0
0
2
4
0
0
08
/
1
7
/
2
0
1
3
1
1
0
2
9
9
.
1
5
4
1
8
1
5
4
/
5
/
6
4
.
5
3
.
0
4
.
0
/
9
0
.
8
-
1
.
0
8
.
2
0
.
1
0
2
7
5
0
0
2
0
0
0
08
/
1
8
/
2
0
1
3
1
1
0
2
9
9
.
2
0
4
1
7
1
6
6
/
7
/
8
4
.
8
3
.
4
1
.
0
/
9
3
.
4
-
1
.
0
8
.
9
0
.
1
6
2
7
5
0
0
1
6
0
0
08
/
1
9
/
2
0
1
3
1
1
0
6
7
9
.
1
5
4
3
7
1
7
8
/
9
/
1
0
5
.
0
3
.
1
0
.
1
/
9
4
.
5
-
1
.
0
8
.
0
0
.
5
0
2
8
0
0
0
8
0
0
08
/
2
0
/
2
0
1
3
1
1
0
9
9
9
.
2
0
5
1
1
0
1
5
6
/
7
/
8
4
.
2
3
.
1
0
.
0
/
9
4
.
5
-
1
.
0
9
.
3
0
.
4
0
2
9
5
0
0
6
0
0
08
/
2
1
/
2
0
1
3
1
1
0
9
9
8
.
9
0
5
0
1
1
1
4
7
/
9
/
1
0
4
.
7
1
.
6
2
.
0
/
9
4
.
0
-
1
.
0
8
.
1
0
.
3
0
2
9
0
0
0
2
0
0
08
/
2
2
/
2
0
1
3
1
1
1
6
1
8
.
9
0
4
9
1
2
1
2
5
/
6
/
7
5
.
0
1
.
5
0
.
0
/
9
6
.
0
-
1
.
0
8
.
5
0
.
4
0
3
0
0
0
0
2
0
0
08
/
2
3
/
2
0
1
3
1
1
4
1
2
8
.
9
0
4
2
8
1
3
6
/
9
/
1
1
7
.
4
1
.
7
0
.
0
/
9
6
.
0
-
1
.
0
8
.
2
0
.
4
0
2
8
0
0
0
2
0
0
08
/
2
4
/
2
0
1
3
1
1
4
1
2
8
.
9
0
4
2
9
1
3
6
/
8
/
1
0
5
.
9
1
.
5
0
.
0
/
9
6
.
0
-
1
.
0
8
.
8
0
.
5
0
3
0
0
0
0
1
2
0
08
/
2
5
/
2
0
1
3
1
1
4
1
2
8
.
9
0
4
5
1
0
1
6
6
/
8
/
1
1
5
.
7
1
.
6
0
.
0
/
9
6
.
0
-
1
.
0
1
0
.
5
0
.
6
0
2
9
0
0
0
8
0
08
/
2
6
/
2
0
1
3
1
1
4
1
2
8
.
9
0
4
4
1
0
1
6
6
/
9
/
1
0
6
.
2
1
.
5
0
.
0
/
9
6
.
0
-
1
.
0
9
.
9
0
.
5
0
3
0
0
0
0
8
0
Ab
b
r
e
v
i
a
t
i
o
n
s
MW
=
M
u
d
W
e
i
g
h
t
V
I
S
=
F
u
n
n
e
l
V
i
s
c
o
s
i
t
y
P
V
=
P
l
a
s
t
i
c
V
i
s
c
o
s
i
t
y
Y
P
=
Y
i
e
l
d
P
o
i
n
t
Ge
l
s
=
G
e
l
S
t
r
e
n
g
t
h
F
L
=
F
i
l
t
r
a
t
e
L
o
ss
F
C
=
F
i
l
t
e
r
C
a
k
e
S
o
l
s
=
S
o
l
i
d
s
O/
W
=
O
i
l
t
o
W
a
t
e
r
r
a
t
i
o
S
d
=
S
a
n
d
c
o
n
t
e
n
t
C
l
=
C
h
l
o
r
i
d
e
s
C
a
=
H
a
r
d
n
e
s
s
SC
U
1
2
B
-
0
9
26
Co
n
t
r
a
c
t
o
r
:
B
a
r
o
i
d
Mu
d
T
y
p
e
:
E
Z
M
u
d
6
%
K
C
l
Da
t
e
De
p
t
h
(f
t
)
MW
(p
p
g
)
VI
S
(s
/
q
t
)
PV
Y
P
G
e
l
s
FL
(c
c
)
So
l
s
(%
)
O/
W
Ra
t
i
o
Sd
(%
)
MB
T
(p
p
b
eq
.
)
pH
Al
k
(P
m
)
Cl (mg/L) Ca (mg/L)
08
/
2
7
/
2
0
1
3
1
1
4
1
2
8
.
9
0
4
3
1
0
1
6
6
/
9
/
1
1
6
.
0
1
.
6
0
.
0
/
9
6
.
0
-
1
.
0
8
.
9
0
.
5
0
2
9
0
0
0
8
0
08
/
2
8
/
2
0
1
3
1
1
4
1
2
8
.
9
0
4
3
1
0
1
6
7
/
8
/
9
5
.
8
1
.
5
0
.
0
/
9
6
.
0
-
1
.
0
8
.
5
0
.
5
0
3
0
0
0
0
1
2
0
08
/
2
9
/
2
0
1
3
1
1
4
1
2
8
.
9
0
4
2
9
1
7
6
/
8
/
1
0
5
.
6
1
.
5
0
.
0
/
9
6
.
0
-
1
.
0
8
.
9
0
.
4
0
3
0
0
0
0
1
2
0
08
/
3
0
/
2
0
1
3
1
1
4
1
2
8
.
4
0
2
7
-
-
-
-
-
-
-
-
7
.
2
-
-
-
08
/
3
1
/
2
0
1
3
1
1
4
1
2
8
.
4
5
3
0
2
5
-
-
-
-
-
-
6
.
9
-
-
-
09
/
0
1
/
2
0
1
3
1
1
4
1
2
8
.
4
5
3
1
2
5
-
-
-
-
-
-
7
.
1
-
-
-
Ab
b
r
e
v
i
a
t
i
o
n
s
MW
=
M
u
d
W
e
i
g
h
t
V
I
S
=
F
u
n
n
e
l
V
i
s
c
o
s
i
t
y
P
V
=
P
l
a
s
t
i
c
V
i
s
c
o
s
i
t
y
Y
P
=
Y
i
e
l
d
P
o
i
n
t
Ge
l
s
=
G
e
l
S
t
r
e
n
g
t
h
F
L
=
F
i
l
t
r
a
t
e
L
o
ss
F
C
=
F
i
l
t
e
r
C
a
k
e
S
o
l
s
=
S
o
l
i
d
s
O/
W
=
O
i
l
t
o
W
a
t
e
r
r
a
t
i
o
S
d
=
S
a
n
d
c
o
n
t
e
n
t
C
l
=
C
h
l
o
r
i
d
e
s
C
a
=
H
a
r
d
n
e
s
s
SCU 12B-09
27
5 SHOW REPORTS
Hydrocarbon Show Report # 1
Operator:
Well: API Number:
Field: Date:
Rig: Time:
County: Depth Start End
State: 10170'MD 10370'MD
Country: 10132.8'TVD 10246.4'TVD
Averages
Before During After Maximum
ROP (fph) 62 122 24 122
WOB 27 17 22 27
RPM - 9 - 9
Mud Weight 9.50 9.35 9.20 9.50
Chloride 32,000 31,000 30,000 32,000
Total Gas
C1 (ppm) 2,677 4,270 5,043 5,043
C2 (ppm) 222 632 552 632
C3 (ppm) 124 734 458 734
C4 (ppm) 55 477 258 477
C5 (ppm) 9 228 124 228
Lithology
Cuttings Analysis
Odor V Sli - Mod Fluorescence Cut Fluorescence Residual Cut
Stain Amount 70-90% Type Mod-Imm Amount
Amount None Distribution Patchy-Even Intensity Mod-Strg Color
Color Intensity Strong-Mod Color Milky Residual Fluorescence
Cut Color Bright Yellow Bright Intensity
Color None Yellow Color
Oil Show Rating 1.9 Free Oil in Mud
Comments
Report by:
Gas peak of 215 units at start of interval; the rest of the interval has an average of 40-60 units, with peaks
up to 100-120 units. No visible oil stain, very slight to moderate odor, 70-90% sample fluorescence,
moderate to immediate yellow to bright yellow milky cut fluorescence, moderate to bright yellow residual
ring fluorescence, no visible residue. Where oil rating is fairly low, cut fluorescence was minimal, but there
was a faint residual ring fluorescence.
Mike Sherry
Mod-Strong
Bright Yellow
None
Tuffaceous sandstone, sand, conglomerate sand = Tuffaceous sandstone dominates upper 100’ of
interval: light gray to very light gray; very fine to upper medium grain; subrounded to subangular;
moderately sorted; poorly consolidated; 60-70% ash matrix supported. Bed of carbonaceous shale, with
moderate outgassing, and tuffaceous siltstone from 10200’ to 10220’. Sand and Conglomerate sand
dominate lower 100’ of interval: very light gray to white translucent and transparent quartz grains; upper
fine to lower coarse grain; subdiscoidal sphericity; subrounded to angular; unconsolidated; no matrix;
compositionally mature; 95% quartz; trace to minor tuffaceous sandstone and conglomerate; sand
dominates bottom 35’ of interval.
None
USA
Saxon 169 0053 hrs
Kenai Borough
Alaska
Hilcorp Alaska, LLC
SCU 12B-09 50-133-10126-02-00
Swanson River 8-Aug-13
Pixler Plot
1
10
100
1000
10000
1 2 3 4
pp
m
DRY GAS
GAS
CONDENSATE
OIL
NON PRODUCTIVE
C1/C2 C1/C4 C1/C5 C1/C3
Hydrocarbon Show Report # 2
Operator:
Well: API Number:
Field: Date:
Rig: Time:
County: Depth Start End
State: 10462'MD 10560'MD
Country: 10251'TVD 10377'TVD
Averages
Before During After Maximum
ROP (fph) 23.9 26.9 11.3 172.0
WOB 15.4 4.0 13.5 37.0
RPM 17.8 37.9 3.4 55.0
Mud Weight 9.25 9.25 9.25 9.25
Chloride 30,500 30,500 30,500 30,500
Total Gas 56 28 13 72
C1 (ppm) 4,335 2,553 880 8,253
C2 (ppm) 560 192 78 636
C3 (ppm) 575 229 79 756
C4 (ppm) 390 155 52 563
C5 (ppm) 160 81 30 235
Lithology
Cuttings Analysis
Odor None Fluorescence Cut Fluorescence Residual Cut
Stain Amount 40-90% Type Amount
Amount none Distribution Even Intensity Color
Color Intensity Bright Color Residual Fluorescence
Cut Color Mlky-Yel Intensity
Color None Color
Oil Show Rating Free Oil in Mud
Comments
Report by:
None
Tuffaceous Siltstone (10360' - 10430') = medium light gray to light gray with medium gray hues; soft; poorly
indurated; stiff to pasty; wedge like cuttings habit; smooth to silty; waxy to greasy; minor tuff with trace
carbonaceous shale; claystone appears near end of interval; signs of good oil show increase as sand
content increases in interval. Tuffaceous Claystone, Tuffaceous Sandstone (10430' - 10568') = very light
gray, grayish white, light gray in part; very fine grain; subrounded to rounded; subdiscoidal; well sorted; up
to 15% loose quartz sand; balance varies from an 'ash-stone' with varying amounts of well indurated quartz
from 10-80%; non- calcareous;
Kenai Borough
Alaska
USA
Hilcorp Alaska, LLC
50-133-10126-02-00 SCU 12B-09
Swanson River
Saxon 169
08/11/13
2215 hrs
Moderate
Larry Resch
NO STAIN OR ODOR; 40-90% BRIGHT YELLOW, BECOMING ORANGE TO YELLOW ORANGE
FLUORESCENCE AT THE BASE OF THE INTERVAL; INITIALLY AN IMMEDIATE MILKY TO WHITE
BURST CUT WITH OCCASIONAL STRONG STREAMING; BRIGHT MILKY FLUORESCENT RING NO
VISIBLE RESIDUE. BASE OF INTERVAL DISPLAYS NO IMMEDIATE VISIBLE SOLVENT REACTION
OR CUT; FLUORESCENT RESIDUAL RING IS WHITE TO MILKY AND VERY SLIGHTLY LIGHT MILKY
TO YELLOW.
No 2.2 to 1.6
Mlky-Yel
Pixler Plot
1
10
100
1000
10000
1 2 3 4
pp
m
DRY GAS GAS
CONDENSATE
OI L
NON PRODUCTIVE
C1/C2 C1/C4 C1/C5 C1/C3
Hydrocarbon Show Report # 3
Operator:
Well: API Number:
Field: Date:
Rig: Time:
County: Depth Start End
State: 10590'MD 10700'MD
Country: 10339'TVD 10377'TVD
Averages
Before During After Maximum
ROP (fph) 14 40 20 67
WOB 15 39 19 38
RPM slide slide 51 49
Mud Weight 9.32 9.32 9.32 9.32
Chloride 28,500 28,500 28,500 28,500
Total Gas 13 154 102 545
C1 (ppm) 782 2,495 1,551 19,626
C2 (ppm) 68 221 212 2,126
C3 (ppm) 70 381 263 3,383
C4 (ppm) 46 605 218 6,169
C5 (ppm) 36 830 245 5,289
Lithology
Cuttings Analysis
Odor Moderate Fluorescence Cut Fluorescence Residual Cut
Stain none Amount 30-100% Type Fast Amount
Amount Distribution even Intensity Strong Color
Color Intensity Mod-Bri Color Clear to Residual Fluorescence
Cut Color Yel-Org V Lt Whi Intesity
Color Color
Oil Show Rating Free Oil in Mud
Comments
Report by:
Tuffaceous Sand, Conglomeratic Sand, Tuff, Tuffaceous Claystone (10610' - 10740') = light gray to grayish
white, becoming light olive gray, increasing brownish hues; very fine to lower fine grain; subrounded to
rounded; subdiscoidal; well sorted in part; generally well indurated within ashy/ weathered tuff matrix; note
localized grain supported quartz sandstone with good visual porosity; note well developed coal at 10680'.
Kenai Borough
Alaska
USA
Hilcorp Alaska, LLC
50-133-10126-02-00 SCU 12B-09
Swanson River
Saxon 169
8/14/2013
1345 hrs
Weak
Larry Resch
FREE OIL AT POSSUM BELLY WELL MIXED WITH DRILLING FLUID; MODERATE HYDROCARBON
ODOR AT THE PITS; DRILLING MUD FLUORESCES BRIGHT YELLOW; NO VISIBLE STAIN; 30-100%
YELLOW TO ORANGE CUTTING FLUORESCENCE; IMMEDIATE BUT BARELY PERCEPTIBLE
CLEAR TO VERY LIGHT WHITE CUT WITH OCCASIONAL VERY LIGHT WHITE TO MILKY STREAM;
BARELY VISIBLE VERY LIGHT WHITE FLUORESCENT RING; NO VISIBLE RESIDUE.
In mud + floating in pits 2.0 to 2.5
V LT Whi
Pixler Plot
1
10
100
1000
10000
1 2 3 4
pp
m
DRY GAS GAS
CONDENSATE
OI L
NON PRODUCTIVE
C1/C2 C1/C4 C1/C5 C1/C3
Hydrocarbon Show Report # 4
Operator:
Well: API Number:
Field: Date:
Rig: Time:
County: Depth Start End
State: 10730'MD 11017'MD
Country: 10386'TVD 10452'TVD
Averages
Before During After Maximum
ROP (fph) 19.5 32.7 229.4
WOB 18.7 11.5 52.0
RPM 51.0 57.7 59.0
Mud Weight 9.20 8.90 no returns
Chloride
Total Gas 104 59 no returns 112
C1 (ppm) 1,749 5,204 14,865
C2 (ppm) 236 195 773
C3 (ppm) 278 200 572
C4 (ppm) 219 115 352
C5 (ppm) 250 70 435
Lithology
Cuttings Analysis
Odor Slight-Mod Fluorescence Cut Fluorescence Residual Cut
Stain Amount 70-100% Type Fast Amount
Amount None Distribution Even Intensity Strong Color
Color Intensity Dl to Bri Color Milky Residual Fluorescence
Cut Color Org to Yel Intesity
Color Color
Oil Show Rating Free Oil in Mud
Comments
Report by:
Conglomeratic Sand, Loose Sand, Pebble Fragments (10810' - 10920') = dominantly unconsolidated/
disconsolidated sand and pebble fragments; upper fine to lower medium, occasionally upper medium
grain; subangular to subrounded; subprismoidal to subdiscoidal; fair to moderate sorting; locally
abundant well rounded subprismoidal pebble fragments with fresh high impact fracture; 60-80% grayish
white, translucent, rare transparent quartz; grayish black to dark gray lithics common, occasional reddish
orange mafic minerals, trace greenstone. Conglomeratic Sand, Loose Sand, Ash/Tuff 10920' - 11017') =
80-90% loose sand, 20-10% ash/ weathered tuff; upper fine to lower medium grain; subangular to
subrounded; subdiscoidal to subprismoidal; occasional well rounded subprismoidal pebble fragments with
high impact fractured surfaces; ash/ weathered tuff is white to grayish white with very little clastic
component.
Kenai Borough
Alaska
USA
Hilcorp Alaska, LLC
50-133-10126-02-00 SCU 12B-09
Swanson River
Saxon 169
8/16/2013
1620 hrs
Strong
Larry Resch
(10810-10920) NO VISIBLE OIL STAIN; VERY SLIGHT ODOR; 20% BRIGHT YELLOW, 50% AND GREATER
DULL ORANGE FLUORESCENCE EVENLY DISTRIBUTED THROUGHOUT SAMPLES; IMMEDIATE
BRIGHTENING WITH VERY LIGHT WHITE FLUORESCENT CUT; VERY FAST MILKY WHITE STREAMERS;
MODERATE TO STRONG MILKY FLUORESCENT RING; NO VISIBLE RESIDUE. (10920-11017) NO STAIN;
LIGHT ODOR; 90% DULL ORANGE/ 10% BRIGHT YELLOW FLUORESCENCE; WATER IN PROCESSED
SAMPLES FLUORESCES; IMMEDIATE BRIGHTENING WITH BURST OF FLUORESCENT WHITE WHICH
DISSIPAITES QUICKLY; BRIGHT WHITE FLUORESCENT RING; NO VISISBLE RESIDUE.
Yes 2.5
White
Pixler Plot
1
10
100
1000
10000
1 2 3 4
pp
m
DRY GAS GAS
CONDENSATE
OI L
NON PRODUCTIVE
C1/C2 C1/C4 C1/C5 C1/C3
SCU 12B-09
28
6 DAILY REPORTS
Hilcorp Alaska, LLC
Swanson River Rield DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Pederson
DATE: July 13, 2013 DEPTH - PRESENT OPERATION: CBU for produced water
TIME: 2359 hrs YESTERDAY -
24 HOUR FOOTAGE -
CASING INFORMATION 11.75" @ 2009' 7" @ 9850'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
1RR 6.00" BHC / MX-18HDX 52101114 3x16
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 9800'/9792'
MW 10.3 VIS 54 PV 14 YP 19 Gels 6/7/8 FL 4.1 FC 1/1
SOL 7.0 NAF/W 0.0/90.2 SD - MBT 1.0 pH 9.4 ALK 0.4 Cl- 35000 Ca+ 200
MWD SUMMARY
INTERVAL - TO -
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS 919 u
CUTTING GAS - @ - @ - WIPER GAS -
CHROMATOGRAPHY (ppm) SURVEY -
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH -
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG -
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT -
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND -
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS -
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY -
PRESENT LITHOLOGY -
DAILY
ACTIVITY
SUMMARY
TIH from 1656’ to 5476’. Add pipe onto rack, strap, insert strap into pipe tally. TIH from 5476’ to 5692’. Fill pipe, calibrate Pason torque, pump
strokes, flow and gas sniffer with Pason tech. TIH from 5692’ to 6203’. Tag at 6203’; 1,600 rotating torque, max torque = 6,000; reamed twice.
TIH from 6203’ to 7005’. Trips/PU singles from 7005’ to 8000’. Trips load pipe rack strap add to tally. Trips/RIH with singles, tag plug at 9850’.
Condition mud and circulate; PJSM, T brake circulation with water at 5 BPM, 20 RPM.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860
REPORT BY: Mike Sherry
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Pederson
DATE: July 14, 2013 DEPTH 9849' PRESENT OPERATION: P/U Whipstock and milling assembly
TIME: 2359 hrs YESTERDAY -
24 HOUR FOOTAGE -
CASING INFORMATION 11.75" @ 2009' 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
2 6.0625" BOT Mill - casing cutter 10127231 - 9849'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 9850' / 9842'
MW 10.45 VIS 50 PV 13 YP 16 Gels 5/6/8 FL 3.6 FC 1/1
SOL 7.5 NAF/W 0.0/89.8 SD - MBT 1.0 pH 9.1 ALK 0.30 Cl- 35000 Ca+ 80
MWD SUMMARY
INTERVAL - TO -
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS 1153 u
CUTTING GAS - @ - @ - WIPER GAS -
CHROMATOGRAPHY (ppm) SURVEY -
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH -
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG -
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT -
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND -
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS -
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY -
PRESENT LITHOLOGY -
DAILY ACTIVITY
SUMMARY
Test casing, RU test casing to 3000 PSI for 30 minutes on Charted. Change out wash pipe. Test 9849’ of 7” casing to 300 PSI and hold for
30 minutes. Prep rig floor and board to POOH. POOH from 9849’ to Jars. Turn elevators around to lay down jars. Directional work – LD BHA,
PU tools. Rig service change out grabber DIE’s.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860
REPORT BY: Mike Sherry
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Pederson
DATE: July 15, 2013 DEPTH 9830' PRESENT OPERATION: Milling out window
TIME: 2359 hrs YESTERDAY
24 HOUR FOOTAGE
CASING INFORMATION 11.75" @ 2009' 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
2 6.0625" BOT Mill - casing cutter 10127231 - 9830'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 9850' / 9842'
MW 10.45 VIS 51 PV 14 YP 18 Gels 6/7/8 FL 3.7 FC 1/1
SOL 7.7 NAF/W 0.0/89.6 SD - MBT 1.0 pH 9.0 ALK 0.25 Cl- 35000 Ca+ 100
MWD SUMMARY
INTERVAL - TO -
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS 257 u
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 40 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS -
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY -
PRESENT LITHOLOGY -
DAILY ACTIVITY
SUMMARY
RIH with whipstock to 9796’. Displace well with 10.5 PPG 6% KCl PHPA mud. Rig up wireline tools. Run in the hole with gyro. Orient
whipstock, tag at 9849; gyro tool face set at 307 degrees. Logging while POOH with wireline. RD wireline. Set whipstock. Mill out window.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860
REPORT BY: Mike Sherry
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR Greco, Rose, Grubb, Pederson
DATE July 16, 2013 DEPTH 9869' PRESENT OPERATION L/D Milling assembly
TIME 2359 hrs YESTERDAY 9830'
24 HOUR FOOTAGE 39
CASING INFORMATION 11.75" @ 2009' 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED
2 6.0625" BOT Mill - casing cutter 10127231 - 9830' 9869' 39' 9.8
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 9. @ 9854' 1 @ 9839' 3.7 3 FT/HR
SURFACE TORQUE 7381 @ 9836' 334 @ 9831' 4197.4 3741 AMPS
WEIGHT ON BIT 15 @ 9855' 4 @ 9834' 11.0 14 KLBS
ROTARY RPM 84 @ 9831' 77 @ 9838' 83.3 84 RPM
PUMP PRESSURE 1267 @ 9867' 809 @ 9833' 1079.7 1210 PSI
DRILLING MUD REPORT DEPTH 9,870' / 9,862'
MW 10.5 VIS 51 PV 15 YP 20 FL 3.7 Gels 6/8/9 CL- 33000
FC 1/1 SOL 7.8 SD - OIL 0.0 / 89.6 MBL 1.0 pH 9.8 Ca+ 200 CCI
MWD SUMMARY
INTERVAL - TO -
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 139 @ 9840' 16 @ 9867' 29.8 TRIP GAS 257 u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ CONNECTION GAS HIGH
ETHANE (C-2) @ @ AVG
PROPANE (C-3) @ @ CURRENT
BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG 8 u
PENTANE (C-5) @ @
HYDROCARBON SHOWS -
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY -
PRESENT LITHOLOGY -
DAILY ACTIVITY
SUMMARY
Mill out window (top of window @ 9830’, bottom of window @ 9843’), mill rathole to 9870’. Pump sweep, circulate,
rotate, and reciprocate/polish window. FIT test to 13.5 equivalent mud weight / flow check. Pump slug. POOH from
9870’-7840’. POOH from 7840’ to BHA. L/D BHA.
CANRIG PERSONNEL ON BOARD Resch, Sherry, Grundin DAILY COST $2860
REPORT BY Mike Sherry
Page 1 of 1Daily Report
7/17/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Rose, Grubb, Pederson
DATE: July 17, 2013 DEPTH 9869' PRESENT OPERATION: RIH
TIME: 2359 hrs YESTERDAY 9830'
24 HOUR FOOTAGE 39'
CASING INFORMATION 11.75" @ 2009' 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3 6" DP505FX / HCC Bit #2 7028786 5x11 9869'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 9 @ 9854' 1 @ 9839' 3.7 3 FT/HR
SURFACE TORQUE 7381 @ 9836' 334 @ 9831 4197.4 3741 FT-LBS
WEIGHT ON BIT 15 @ 9855' 4 @ 9834' 11 14 KLBS
ROTARY RPM 84 @ 9831' 77 @ 9838' 83.3 84 RPM
PUMP PRESSURE 67 @ 9867' 809 @ 9833' 1079.7 1210 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 9870' / 9862'
MW 10.5 VIS 52 PV 12 YP 22 Gels 5/7/8 FL 3.5 FC 1/1
SOL 7.8 NAF/W 0.0/89.6 SD - MBT 1.0 pH 9.9 ALK 0.60 Cl- 33000 Ca+ 160
MWD SUMMARY
INTERVAL 9869' TO 9869'
TOOLS Gamma, ECD, Resistivity, Directional, Density, Caliper, Porosity
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 5 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS -
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY -
PRESENT LITHOLOGY -
DAILY ACTIVITY
SUMMARY
L/D BHA #2, clean floor of all un-needed tools. Rig service, clean floor, grease crown, washpipe, top drive.
P/U directional tools, BHA #3, scribe tools. Test MWD tools. RIH.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/18/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Rose, Grubb, Pederson
DATE: July 18, 2013 DEPTH 9869' PRESENT OPERATION: BOP test
TIME: 2359 hrs YESTERDAY 9869'
24 HOUR FOOTAGE 0'
CASING INFORMATION 11.75 @ 2009' 7" @ 9849'
SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3 6 DP505FX / HCC bit#2 7028786 5x11 9869'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 9870' / 9862'
MW 10.55 VIS 52 PV 13 YP 20 Gels 5/7/8 FL 3.7 FC 1/1
SOL 7.8 NAF/W 0.0/89.6 SD - MBT 1.0 pH 9.9 ALK 0.40 Cl- 33000 Ca+ 160
MWD SUMMARY
INTERVAL 9869' TO 9869'
TOOLS Gamma, ECD, Resistivity, Directional, Caliper, Porosity
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 0 @ 0 @ 0.0 TRIP GAS
CUTTING GAS 0 @ 0 @ 0.0 WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 0 @ 0 @ 0.0 CONNECTION GAS HIGH
ETHANE (C-2) 0 @ 0 @ 0.0 CONNECTION GAS: AVG
PROPANE (C-3) 0 @ 0 @ 0.0 CONNECTION GAS: CURRENT
BUTANE (C-4) 0 @ 0 @ 0.0 CURRENT AVG BACKGROUND 2 u
PENTANE (C-5) 0 @ 0 @ 0.0
HYDROCARBON SHOWS -
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY -
PRESENT LITHOLOGY -
DAILY
ACTIVITY
SUMMARY
Cut off 75’ drilling line. Test MWD tool. Circulate sweep. R/U wireline tools. Wireline S/M with wireline crew R/D
wireliners. S/M with crew for TOH and clean and prep floor. Flow check S/M TOH for sub in BHA from 9862’ to 483’.
BOP drill while TIH procedures. Finish POOH. L/D directional tools / remove source. Clean and clear rig floor. Test
BOP.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/19/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Rose, Grubb, Pederson
DATE: July 19, 2013 DEPTH 9869' PRESENT OPERATION: Baker troubleshooting tools
TIME: 2359 hrs YESTERDAY 9869'
24 HOUR FOOTAGE 0'
CASING INFORMATION 11.75" @ 2009' 7" @ 9849'
SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3 6" DP505FX / HCC bit#2 7028786 5x11 9869'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 9870' / 9862'
MW 10.50 VIS 46 PV 17 YP 19 Gels 5/6/7 FL 3.8 FC 1/2
SOL 8.0 NAF/W 0.0/89.6 SD MBT 1.0 pH 9.2@74 ALK 0.40 Cl- 31,000 Ca+ 120
MWD SUMMARY
INTERVAL 9869' TO 9869'
TOOLS Gamma, ECD, Resistivity, Directional, Caliper, Porosity
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 0 @ 0 @ 0.0 TRIP GAS
CUTTING GAS 0 @ 0 @ 0.0 WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 0 @ 0 @ 0.0 CONNECTION GAS HIGH
ETHANE (C-2) 0 @ 0 @ 0.0 CONNECTION GAS: AVG
PROPANE (C-3) 0 @ 0 @ 0.0 CONNECTION GAS: CURRENT
BUTANE (C-4) 0 @ 0 @ 0.0 CURRENT AVG BACKGROUND
PENTANE (C-5) 0 @ 0 @ 0.0
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY
PRESENT LITHOLOGY
DAILY
ACTIVITY
SUMMARY
Test BOP components Test blind Rams @ 250PSI and 4000PSI. Pull test plug and install wear bushing. S/M with
DD & rig crew for making up BHA. M/U bit, motor, UBHP and orientate UBHO. S/M with MWD and RPS to install
sources. M/U BHA. M/U directional tools; test MWD tool. POOH MWD failure. Unload radio active sources. L/D
MWD tools; P/U new tools and upload data
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Nick Barber
Page 1 of 1Daily Report
7/20/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Rose, Grubb, Pederson
DATE: Jul 20, 2013 DEPTH 9961' PRESENT OPERATION: Sliding
TIME: 2359 hrs YESTERDAY 9869'
24 HOUR FOOTAGE 92'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
No true surveys taken
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 9869'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 54.2 @ 9913' 0.9 @ 9875' 23.8 39.29 FT/HR
SURFACE TORQUE 3741 @ 9869' 13 @ 9886' 62.7 0.00 FT-LBS
WEIGHT ON BIT 15 @ 9873' 1 @ 9937' 3.6 2.93 KLBS
ROTARY RPM 83 @ 9869' 83 @ 9869' 0.9 0.00 RPM
PUMP PRESSURE 2322 @ 9952' 63 @ 9870' 2083.5 2262.84 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 9957' / 9957'
MW 10.55 VIS 48 PV 14 YP 19 Gels 5/6/8 FL 3.8 FC 1/2
SOL 7.8 NAF/W 0.0/89.6 SD - MBT 1.0 pH 9.5 ALK 0.4 Cl- 33000 Ca+ 160
MWD SUMMARY
INTERVAL 9869' TO
TOOLS PDC bit on mud motor with Ontrak MWD, BCPM, SDN
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 26 @ 9940' 1 @ 9872' 5.1 TRIP GAS -
CUTTING GAS 0 @ 9961' 0 @ 9961' 0.0 WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 4811 @ 9940' 13 @ 9870' 741.9 CONNECTION GAS HIGH -
ETHANE (C-2) 188 @ 9948' 0 @ 9870' 18.8 CONNECTION GAS: AVG -
PROPANE (C-3) 68 @ 9948' 0 @ 9887' 12.2 CONNECTION GAS: CURRENT
BUTANE (C-4) 34 @ 9947' 0 @ 9872' 5.2 CURRENT AVG BACKGROUND 3 u
PENTANE (C-5) 70 @ 9947' 0 @ 9887' 6.2
HYDROCARBON SHOWS -
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous Sandstone, Tuffaceous Siltstone
PRESENT LITHOLOGY Tuffaceous Sandstone/Tuffaceous Siltstone
DAILY ACTIVITY
SUMMARY
TIH to 9747’. Test MWD tool. TIH from 9747’ to 9867’. S/M with wireline, DD, and rig crew about wireline inside
DP. R/U and run wireline logs. Slide from 9870’ to 9965’. POOH to remove side entry sub. POOH with wireline;
R/D wireline equipment. Drill from 9965’ to XXXX’
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/21/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Rose, Grubb, Pederson
DATE: Jul 21, 2013 DEPTH 10087' PRESENT OPERATION: Make up BHA
TIME: 11:02:18 YESTERDAY 9961'
24 HOUR FOOTAGE 126'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
9965' 9.32 327.14 9956.82'
10028' 12.44 322.36 10018.68'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3 6" DP505FX / HCC bit#2 7028786 5x11 /0.464 9869' 10087'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 141.2 @ 10011' 0.9 @ 10047' 28.1 48.08 FT/HR
SURFACE TORQUE 3398 @ 9965' 4 @ 10070' 408.0 0 FT-LBS
WEIGHT ON BIT 17 @ 9971' 1 @ 10085' 4.9 3.03 KLBS
ROTARY RPM 55 @ 9966' 0 @ 10021' 1.8 0 RPM
PUMP PRESSURE 2280 @ 10049' 1868 @ 10012' 2091.4 2103.11 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10087/10078
MW 10.50 VIS 46 PV 14 YP 20 Gels 5/6/8 FL 3.8 FC 1/2
SOL 7.4 NAF/W 0.0/90.0 SD .10 MBT 1.0 pH 9.5 ALK .80 Cl- 33000 Ca+ 120
MWD SUMMARY
INTERVAL 9869' TO 10087'
TOOLS PDC bit on mud motor with Ontrak MWD, BCPM, SDN
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 17 @ 10072' 0 @ 9978' 5.4 TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 2091 @ 10000' 120 @ 9978' 535.2 CONNECTION GAS HIGH
ETHANE (C-2) 153 @ 10073' 1 @ 10033' 27.3 CONNECTION GAS: AVG -
PROPANE (C-3) 131 @ 10071' 0 @ 9975' 22.0 CONNECTION GAS: CURRENT
BUTANE (C-4) 76 @ 10071' 0 @ 10033' 11.7 CURRENT AVG BACKGROUND 2 u
PENTANE (C-5) 56 @ 9981' 0 @ 10033' 7.0
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, Tuffaceous siltstone, conglomeritic sand, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, conglomeritic sand and loose sand
DAILY
ACTIVITY
SUMMARY
Drill actual slide from 10015’ to 10087’. Trip out 5 stands and wait on orders. Rig service: grease blocks TD, DW,
swivel, check dead man bolts and BOP drill. Trip out of hole to dial up motor. Rig service/grease TD, DW, check all
fluids. POOH. Unload radioactive sources, L/W directional tools. Adjust motor to 1.4 degree bend, load data, load
radioactive sources.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: 3260
REPORT BY: Nick Barber
Page 1 of 1Daily Report
7/22/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Rose, Grubb, Pederson
DATE: Jul 22, 2013 DEPTH 10246' PRESENT OPERATION: Drilling ahead
TIME: 2359 hrs YESTERDAY 10087'
24 HOUR FOOTAGE 159'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10104' 17.25 317.18 10092.12'
10137' 18.99 317.15 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 205.9 @ 10177' 0.5 @ 10088' 48.0 13.43 FT/HR
SURFACE TORQUE 4373 @ 10178' 0 @ 10167' 1386.5 0.00 FT-LBS
WEIGHT ON BIT 14 @ 10109' 0 @ 10196' 4.0 6.84 KLBS
ROTARY RPM 59 @ 10131' 1 @ 10229' 21.5 0.00 RPM
PUMP PRESSURE 2321 @ 10221' 1837 @ 10173' 2102.0 2110.02 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD
MW 10.4 VIS 46 PV 17 YP 21 Gels 5/6/8 FL 3.8 FC 1/2
SOL 7.5 NAF/W 0.0/90.0 SD 0.10 MBT 1.0 pH 9.9 ALK 0.80 Cl- 32000 Ca+ 120
MWD SUMMARY
INTERVAL 9869' TO
TOOLS PDC bit on mud motor with Ontrak MWD, BCPM, SDN
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 184 @ 10190' 0 @ 10110' 24.5 TRIP GAS 16 u
CUTTING GAS 0 @ 10246' 0 @ 10246' 0.0 WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 18824 @ 10191' 122 @ 10110' 2050.8 CONNECTION GAS HIGH 106 u
ETHANE (C-2) 2186 @ 10190' 5 @ 10103' 262.8 CONNECTION GAS: AVG 35 u
PROPANE (C-3) 1576 @ 10190' 0 @ 10090' 248.8 CONNECTION GAS: CURRENT
BUTANE (C-4) 660 @ 10189' 0 @ 10097' 128.5 CURRENT AVG BACKGROUND 10 u
PENTANE (C-5) 2434 @ 10189' 0 @ 10127' 99.3
HYDROCARBON
SHOWS Fair shows from 10130'-10160' and 10190'-10240'
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
1: 10130'-10160'has
fair show 2: 10190'-
10240' has a fair
show.
1: Signs of oil where tuffaceous sandstone
dominates after coal and carbonaceous shale at
10125'. Diminishes when tuffaceous sandstone
diminishes. 2: Predominately tuffaceous
sandstone with some loose sand, with signs of
oil throughout interval.
1: Gas peak of 65 units
in middle of oil show. 2:
Gas peak of 185 units
just above start of oil
show; otherwise fairly
consistent throughout
interval.
1: No visible stain; no odor; 40-75% bright yellow to yellow
white fluorescence; immediate milky to milky-white burst
fluorescent cut; strong light milky to yellow fluorescent ring; no
visible residue; fluorescence changes to orange to dull orange
by 10160'-10170' sample 2: No visible stain; very slight to
slight odor; 70-90% bright yellow sample fluorescence;
immediate bright milky yellow cut fluorescence; moderate light
yellow-orange redidual ring; no visible residual cut.
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY ACTIVITY
SUMMARY
TIH from 5126’ to 10088’. Slide from 10088’ to 10131’. Rotate from 10131’ to 10158’. Slide from 10158’ to 10173’. Rotate from 10173’ to
10197’. Slide from 10197’ to 10204’. Drilling from 10204’ to XXXXX’
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/23/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Grubb, Pederson, Rose
DATE: Jul 23, 2013 DEPTH 10262' PRESENT OPERATION: Pumping LCM and building volume
TIME: 2359 hrs YESTERDAY 10246'
24 HOUR FOOTAGE 16'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 44.5 @ 10260' 5.0 @ 10248' 14.9 5.51065 FT/HR
SURFACE TORQUE 350 @ 10249' 350 @ 10249' 21.9 0.00000 FT-LBS
WEIGHT ON BIT 9 @ 10257' 2 @ 10260' 4.8 5.18000 KLBS
ROTARY RPM 15 @ 10249' 15 @ 10249' 1.0 0.00000 RPM
PUMP PRESSURE 2414 @ 10258' 2110 @ 10246' 2465.5 2281.62988 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10263 / 10250
MW 10.20 VIS 48 PV 14 YP 19 Gels 6/8/9 FL 3.8 FC 1/0
SOL 6.5 NAF/W 0.0/91.0 SD .10 MBT 1.0 pH 8.6 ALK .90 Cl- 32000 Ca+ 160
MWD SUMMARY
INTERVAL 9863' TO
TOOLS PDC bit on mud motor with Ontrak MWD, BCPM, SDN
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 23 @ 10254' 6 @ 10262' 18.4 TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 1798 @ 10246' 474 @ 10257' 919.8 CONNECTION GAS HIGH
ETHANE (C-2) 194 @ 10246' 64 @ 10257' 111.2 CONNECTION GAS: AVG
PROPANE (C-3) 271 @ 10256' 108 @ 10257' 150.7 CONNECTION GAS: CURRENT
BUTANE (C-4) 140 @ 10256' 56 @ 10257' 80.5 CURRENT AVG BACKGROUND 4 u
PENTANE (C-5) 69 @ 10256' 26 @ 10248' 34.8
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tufffaceous sandstone, tuffaceous claystone, and loose sand
DAILY
ACTIVITY
SUMMARY
Lost circulation at 10262, pumped down hole and down back side. POOH to shoe. Build two LCM pills and spot down hole. Fluid loss 303 BBL.
Build volume and LCM pills. TIH from 9846’ to 10262’. Pump 50 BBL 35 lb per BBL LCM pill. TOH from 10262’ to 9814’. Pump mud down
backside to fill hole and check for loses and build volume. TIH from 9847’ to 10262’. Pump 23 BBL of 35 lb per BBL LCM pill. Pump on backside
and squeeze 16 BBL. Filled hole with trip tank and monitor well. Pumped second 23 BBL of 35 lb LCM pill. Pumped on backside and squeezed
19 BBL. Filled with trip tank and monitor well. Pump third 23 BBL of 35 lb LCM pill.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Nick Barber
Page 1 of 1Daily Report
7/24/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\DESKTOP\MI ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Grubb, Pederson, Rose
DATE: Jul 24, 2013 DEPTH 10271' PRESENT OPERATION: Building mud volume
TIME: 2359 hrs YESTERDAY 10262'
24 HOUR FOOTAGE 9'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 1986 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 91.4 @ 10266' 5.5 @ 10262' 54.8 6.26 FT/HR
SURFACE TORQUE 0 @ 10271' 0 @ 10271' 0.0 0.00 FT-LBS
WEIGHT ON BIT 7 @ 10263' 1 @ 10271' 3.5 1.60 KLBS
ROTARY RPM 0 @ 10271' 0 @ 10271' 0.0 0.00 RPM
PUMP PRESSURE 2281 @ 10262' 1432 @ 10271' 2045.1 1432.45 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260'
MW 10.2 VIS 50 PV 14 YP 18 Gels 5/6/7 FL 4.4 FC 1/0
SOL 6.6 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 8.6 ALK 0.01 Cl- 30500 Ca+ 160
MWD SUMMARY
INTERVAL 9869' TO
TOOLS PDC bit on mud motor with OnTrak, MWD, BCPM, SDN
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 15 @ 10263' 0 @ 10266' 2.9 TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 0 @ 10271' 0 @ 10271' 0.0 CONNECTION GAS HIGH
ETHANE (C-2) 0 @ 10271' 0 @ 10271' 0.0 CONNECTION GAS: AVG
PROPANE (C-3) 0 @ 10271' 0 @ 10271' 0.0 CONNECTION GAS: CURRENT
BUTANE (C-4) 0 @ 10271' 0 @ 10271' 0.0 CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) 0 @ 10271' 0 @ 10271' 0.0
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY
ACTIVITY
SUMMARY
Finished chasing third 23 BBL, 35 lb per BBL pill outside of bit. TOH inside window. Built mud volume. RIH to bottom to pump 23 BBL, 35 lb
per BBL LCM pill. Closed bag, and squeezed pill with 18.5 BBL mud; maximum pressure 320 PSI. RIH to bottom and drill ahead. Drilled 8’ of
new formation with initial returns; lost returns shortly after; lost 167 BBL. Spotted 23 BBL, 50 lb per BBLLCM pill on bottom and TOH to inside
window.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/25/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Grubb, Pederson, Rose
DATE: Jul 25, 2013 DEPTH 10271' PRESENT OPERATION: Monitoring losses / building volume
TIME: 2359 hrs YESTERDAY 10271'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260'
MW 10.2 VIS 48 PV 12 YP 16 Gels 5/6/7 FL 4.6 FC 1/0
SOL 6.5 NAF/W 0.0/91.0 SD 0.1 MBT 1.0 pH 8.9 ALK 0.4 Cl- 31000 Ca+ 160
MWD SUMMARY
INTERVAL 9869' TO
TOOLS PDC bit on mud motor with OnTrak, MWD, BCPM, SDN
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous Sandstone, tuffaceous claystone, loose sand
DAILY ACTIVITY
SUMMARY
Spotted 25 BBL, 20 lb per BBL LCM pil. Squeezed 19.6 BBL at 244 PSI. Tripped up inside window. Monitored well; 34.5 BBL per hour static
losses. Built mud volume. Checked static well losses again; 70.5 BBL per hour. RIH to bottom to spot another 25 BBL, 20 lb per BBL LCM
pill. Monitored well; ~30 BBL per hour static losses.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/26/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Grubb, Pederson, Holiday
DATE: Jul 26, 2013 DEPTH 10271 PRESENT OPERATION: Preparing to test BOPs
TIME: 2359 hrs YESTERDAY 10271'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087' 10271' 184' 8.7 12CTGX1/16BTHP To cement
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260'
MW 10.20 VIS 46 PV 10 YP 16 Gels 6/7/8 FL 4.2 FC 1/0
SOL 6.5 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 8.9 ALK 0.4 Cl- 32000 Ca+ 200
MWD SUMMARY
INTERVAL 9869' TO 10271'
TOOLS PDC bit on mud motor with OnTrak, MWD, BCPM, SDN
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 0 @ 0 @ 0 TRIP GAS -
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 2 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY
ACTIVITY
SUMMARY
Monitor well with trip tank while building mud volume. POOH from 9775’ to 8907’. Rig service: greased DW, tongs, inspected slips, DM, DN,
and checked oil levels. TOH from 8904’ to 5909’ slowly and monitor losses. TOH from 5909’ to 735’ then lay down HWDP from 735’ to 405’ L/O
Commander sub and jars. LD directional tools. Unload radioactive sources. Download date from BPCM. Lay down mud motor. Test MWD tool.
Clean and clear rig floor. Remove wear bushing/flush out top drive with water.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/27/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Grubb, Pederson, Holiday
DATE: Jul 27, 2013 DEPTH 10271' PRESENT OPERATION: RIH to plug with cement
TIME: 2359 hrs YESTERDAY 10271'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260'
MW 10.20 VIS 49 PV 13 YP 16 Gels 6/7/8 FL 4.6 FC 1/0
SOL 6.5 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 8.9 ALK 0.3 Cl- 32000 Ca+ 240
MWD SUMMARY
INTERVAL TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 0 @ 0 @ 0 TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 2 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY ACTIVITY
SUMMARY
Test BOPs. Pull test plug; install wear bushing and blow down choke manifold. S/M with Weatherford; RU power tongs and get all tools on
floor to run 2 7/8 tubing. Run 30 JTs of 2 7/8 tubing from 0’ to 953’. RD Weatherford tool and equipment. Rig service; grease BLLKS, crown,
TD. RIH from 957’ to 7450’.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/28/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson, Holiday
DATE: Jul 28, 2013 DEPTH 10271' PRESENT OPERATION: Monitoring losses / Building mud
TIME: 2359 hrs YESTERDAY 10271'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
-
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD
MW 10.2 VIS 53 PV 11 YP 18 Gels 7/8/9 FL 4.6 FC 1/0
SOL 6.5 NAF/W 0.0/91.0 SD 0.1 MBT 1.0 pH 8.9 ALK 0.3 Cl- 32000 Ca+ 400
MWD SUMMARY
INTERVAL - TO -
TOOLS -
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS @ - @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 1 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY
ACTIVITY
SUMMARY
Monitor well with trip tank while rigging up Schlumberger cementers. RU and pump cement plug. Trip from 10262’ to 8566’. Pump nerf ball
through pipe to clear pipe and 186 BBLS bottoms up. Monitor well with trip tank with losses of 7.3 BBL per hour. Wait on cement 8-10 hours;
monitor well for losses. RIH from 8561’ to 9200’. Wash down from 9200’ to 10271’. Build Baraseal pill; monitor well with trip tank. Pump 23 BBL
of Baraseal and chase with 30 BBL of mud. Monitor well with trip tank; build 80 lb per BBL of Baracarb pill. Pump 23 BBL of 80 lb per BBL
Baracarb pill.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/29/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09 PB1
REPORT FOR: Grubb, Greco, Pederson, Perkovich
DATE: Jul 29, 2013 DEPTH 10271' PRESENT OPERATION: TOH 30 stands off bottom
TIME: 2359 hrs YESTERDAY 10271'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
-
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260'
MW 10.2 VIS 48 PV 10 YP 17 Gels 6/7/8 FL 4.8 FC 1/0
SOL 6.6 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 8.9 ALK 0.30 Cl- 30000 Ca+ 200
MWD SUMMARY
INTERVAL - TO -
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY
ACTIVITY
SUMMARY
Squeeze Baracarb pill. Monitor well with trip tank. Continue to squeeze Baracarb pill. Circulate bottoms up. Monitor well with trip tank. Pumped
21 BBL of 20 lb per BBL Baracarb; chase with 105 BBL of 10.2 weight mud. TOH from 10263’ to 9500’. Squeeze 17.5 BBL of 80 lb per BBL pill.
Hold 161 PSI on B/S while letting seep into formation. Squeeze remaining 4 BBL of 80 lb per BBL pill. Hold 162 PSI on B/S while letting seep into
formation. TIH from 9509’ to 10263’. Monitor well with trip tank. S/M with Schlumberger cementers. Pump 1 BBL of H2O; pressure test lines to
3500 PSI. Pump 10 BBL of mud push @ 12 PPG; pump 50 BBL of cement @ 16.5 PPG. Pump 5 BBL of mud push @ 12 PPG; displace with 83
BBL of mud. R/D cement equipment. POOH 30 stands.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/30/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09 PB1
REPORT FOR: Grubb, Greco, Pederson, Perkovich
DATE: Jul 30, 2013 DEPTH 10271' PRESENT OPERATION: Condition mud and circulate
TIME: 2359 hrs YESTERDAY 10271'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260'
MW 10.2 VIS 45 PV 10 YP 18 Gels 6/7/8 FL 4.8 FC 1/0
SOL 6.6 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 10.2 ALK 0.30 Cl- 30000 Ca+ 600
MWD SUMMARY
INTERVAL - TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceuous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY
ACTIVITY
SUMMARY
Circulate surface to surface. Monitor well with trip tank. Wait on cement. Monitor well with trip tank for 15 minutes; zero losses. TIH to tag
cement from 8379’ to 8800’; wash from 8800’ to 9300’, no tag. Circulate bottoms up; signs of cement returns. TIH wash from 9300’ to 9500’.
Circulate bottoms up; signs of cement returns. TOH from 9500’ to 9300’. Monitor well with trip tank for 15 minutes; zero losses. Wait on cement.
Rig service: greased DW, TD, brake linkage, crown, adjusted brake handle, checked oil, floor motor, TD, rotary table, gear-ends of MP. Wait on
cement. TIH from 9317’ to 10002’. Condition mud and circulate.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
7/31/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09 PB1
REPORT FOR: Grubb, Greco, Pederson, Perkovich
DATE: Jul 31, 2013 DEPTH 10271' PRESENT OPERATION: RIH to pollish cement
TIME: 2359 hrs YESTERDAY 10271'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
4 6" HCC STX1 5224897 3x20 / 0.9204 Top of cement
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260'
MW 10.25 VIS 48 PV 12 YP 23 Gels 8/9/10 FL 6.7 FC 1/2
SOL 6.4 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 10.1 ALK 2.10 Cl- 33000 Ca+ 800
MWD SUMMARY
INTERVAL - TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY ACTIVITY
SUMMARY
POOH from 10002’ to 5200’. POOH from 5200’ to 757’. Well control drill while tripping. R/D DP handling equipment. R/U tubing equipment.
POOH L/D 2 7/8” tubing from 757’ to 400’. Repair brake linkage; service rig. POOH L/D 2 7/8” tubing from 400’ to surface. R/D tubing
equipment. R/U DP handling equipment. PJSM – P/U rotary BHA. RIH.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/1/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09 PB1
REPORT FOR: Grubb, Greco, Pederson, Perkovich
DATE: Aug 1, 2013 DEPTH 10271' PRESENT OPERATION: RIH to cement
TIME: 2159 hrs YESTERDAY 10271'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
4 6" HCC STX1 5224897 3x20 / 0.9204 10006' 10026' 20' 0.28 Depth reached
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260'
MW 10.25 VIS 52 PV 15 YP 24 Gels 8/10/11 FL 5.6 FC 1/2
SOL 6.6 NAF/W 0.0/90.8 SD - MBT 1.0 pH 9.7 ALK 2.00 Cl- 33000 Ca+ 800
MWD SUMMARY
INTERVAL - TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS 10 u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous Sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY ACTIVITY
SUMMARY
TIH from 350’ to 9933’. Wash down from 9933’ to 10006’. Drill/dress cement. Condition mud and circulate/PR. Pump dry job. Trip/POOH from
10020’ to BHA. L/D BHA. R/U Weatherford, change handling equipment. Rig up third party tubing equipment; hold S/M; strap pipe. TIH with 2
7/8” tubing from 1’ to 799’. Rig down third party tools and prep floor to TIH with drill pipe. TIH with drill pipe from 799’ to 2620’.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/2/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09 PB1
REPORT FOR: Grubb, Greco, Pederson, Perkovich
DATE: Aug 2, 2013 DEPTH 10271' PRESENT OPERATION: L/D 2 7/8" tubing
TIME: 2359 hrs YESTERDAY 10271'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10028' 12.44 321.81 10018.68'
10104' 17.25 316.31 10092.12'
10137' 18.99 316.29 10123.49'
10170' 19.86 316.99 10154.61'
10201' 20.82 316.40 10183.67'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
-
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10026' / 10018'
MW 10.3 VIS 50 PV 13 YP 22 Gels 8/10/12 FL 5.8 FC 1/2
SOL 7.0 NAF/W 0.0/90.6 SD - MBT 1.0 pH 10.3 ALK 2.20 Cl- 30000 Ca+ 560
MWD SUMMARY
INTERVAL - TO -
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand
PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand
DAILY
ACTIVITY
SUMMARY
Circulate and reciprocate; GPM = 247; SPP = 1115. Rig service. R/U to pump cement / mix mud push; 12 lb. PJSM with all involved, batch and
pump as per Schlumberger program. Schlumberger displace cement with 87BBL 10.2 PPG mud. Trips; POOH from 10020’ to 8400’. Condition
mud and circulate; drop wiper ball; brake circulation @ 4 BBL/min; increase rate to 8 BBL/min; surface to surface with 10.2 PPG mud. Cut off
drilling line; slip and cut 78’. Pump slug; POOH from 8400’ to 7160’. POOH from 7160’ to 799’. S/M with Weatherford hand and L/D 2 7/8”
tubing. L/D 2 7/8” tubing from 799’-1’.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/3/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 03, 2013 DEPTH 9831' PRESENT OPERATION: POOH; slip die fell down hole
TIME: 2359 hrs YESTERDAY 9831'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3RR1 6" HCC STX-1 5224897 3x20 / 0.9204 9831'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10026' / 10018'
MW 10.3 VIS 50 PV 13 YP 22 Gels 8/10/12 FL 6.0 FC 1/2
SOL 7.0 NAF/W 0.0/90.6 SD - MBT 1.0 pH 11 ALK 2.7 Cl- 31000 Ca+ 840
MWD SUMMARY
INTERVAL - TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY
PRESENT LITHOLOGY
DAILY
ACTIVITY
SUMMARY
R/D tubing equipment. Drain stack and pull wear bushing. S/M over pressure testing. Flush stack with fresh water; install test plug; flush with
fresh water through kill line and HCR line to poorboy degasser. R/U BOP test equipment. Test BOP; annular 250/2500 PSI; test rams; choke; kill
and string valves to 250-4000 PSI for 10 minutes each; all tests charted. Test BOP. Pull test plug; set wear ring; blow down choke manifold.
Trips; P/U BHA; load pipe rack with 17 JTS HWDP; strap. TIH from 313’ to 996’. Waiting on orders: one slip die came out of bottom portion of
DP slips when pulling slips during connection, resulting on die going down hole.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3420
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/4/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 04, 2013 DEPTH 9831' PRESENT OPERATION: Circulate/condition mud
TIME: 2359 hrs YESTERDAY 9843'
24 HOUR FOOTAGE 12'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3RR1 6" HCC STX-1 5224897 3x20 / 0.9204 9207'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 9801' / 9793'
MW 9.9 VIS 53 PV 14 YP 18 Gels 6/8/11 FL 8.4 FC 1/2
SOL 5.5 NAF/W 0.0 / 92.2 SD - MBT 1.0 pH 12.1 ALK 3.10 Cl- 29000 Ca+ 2080
MWD SUMMARY
INTERVAL - TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 5 @ 9843 0 @ 9831.00000 - TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS -
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY
PRESENT LITHOLOGY
DAILY
ACTIVITY
SUMMARY
Safety meeting over gently POOH while pulling die up with BHA. Slowly POOH from 996’ to 20’. Fish slip die out of BOP. Install wear bushing.
TIH from 0’ to 996’. TIH from 996’ to 3600’. Trips; RIH from 3824’ to 9076’; tag cement. Condition mud and circulate; brake circulation at 4 BBL;
wash down to 9207; tag hard cement. Drill hard cement at 9207’; WOB 2/4k; increase WOB 5/8k. Drill cement from 9500’ to 9843’; WOB 12.
Circulate, reciprocate, condition mud.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3420
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/5/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 05, 2013 DEPTH 9843' PRESENT OPERATION: RIH with Gyro
TIME: 2359 hrs YESTERDAY 9843'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
1 6" HCC STX-1 5224897 3x20 / 0.9204 9831 9843 12 1-1-A-I-N-SE-BHA Done drilling cement
2 6" HCC MX-18HDX 5217224 3x14 / 0.4510 9843
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 9843' / 9835'
MW 9.9 VIS 49 PV 14 YP 17 Gels 6/8/11 FL 6.3 FC 1/2
SOL 5.4 NAF/W 0.0/92.2 SD - MBT 1.0 pH 9.0 ALK 0.20 Cl- 30000 Ca+ 3120
MWD SUMMARY
INTERVAL - TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY
PRESENT LITHOLOGY
DAILY ACTIVITY
SUMMARY
Rig service. POOH from 9843’ to 6800’. TOOH; L/D BHA. Trips; P/U BHA L/D MWD; reprogram LWD. Condition
mud and circulate; shallow pulse test at 250’, 235 GPM, 5.5 BBL. Trips, CON-RIH. Rig service. Trips, CON-RIH to
4649’. TIH from 4649’ to 9814’. Rig up gyro equipment; S/M. RIH with gyro.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/6/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 06, 2013 DEPTH 10001' PRESENT OPERATION: TOH to change mud motor angle
TIME: 2359 hrs YESTERDAY 9843'
24 HOUR FOOTAGE 158'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
2 6" HCC MX-18HDX 5217224 3x14 / 0.04510 9843'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 131.8 @ 9869' 0.7 @ 9890' 33.2 31.24 FT/HR
SURFACE TORQUE 2564 @ 9843' 2564 @ 9843' 16.2 0.00 FT-LBS
WEIGHT ON BIT 26 @ 9998' 4 @ 9846' 14.3 17.61 KLBS
ROTARY RPM 40 @ 9843' 2 @ 9914' 0.3 0.00 RPM
PUMP PRESSURE 2207 @ 9982' 1339 @ 9845' 1985.5 2015.87 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10001' / 9993'
MW 9.65 VIS 47 PV 11 YP 16 Gels 5/7/8 FL 5.3 FC 1/2
SOL 4.4 NAF/W 0.0/93.2 SD - MBT 1.0 pH 8.9 ALK 0.40 Cl- 30000 Ca+ 3200
MWD SUMMARY
INTERVAL 9843 TO
TOOLS PDC bit on 1.8 degree mud motor with OnTrak
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 23 @ 9939' 0 @ 9845' 3.5 TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 4625 @ 9939' 152 @ 9895' 655.0 CONNECTION GAS HIGH
ETHANE (C-2) 145 @ 9939' 0 @ 9949' 12.1 CONNECTION GAS: AVG
PROPANE (C-3) 90 @ 9939' 0 @ 9949' 7.6 CONNECTION GAS: CURRENT 0 u
BUTANE (C-4) 17 @ 10000' 2 @ 9993' 0.5 CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) 0 @ 10001' 0 @ 10001' 0.0
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, tuffaceous sandstone, tuffaceous claystone, and minor tuff
PRESENT LITHOLOGY Loose sand, tuffaceous sandstone, tuffaceous claystone, tuff
DAILY
ACTIVITY
SUMMARY
Orient gyro tool. Slide/drill cement from 9843’ to 9880’. Drill actual / slide drilling from 9880’ to 9889’. Deviation
survey; reinitiate gyro; and wire side entry sub pack off. Drill actual / slide drilling from 9889’ to 10,001’. Deviation
survey / gyro confirmation. Condition mud and circulate; work pipe while waiting on orders. Trips / JSA to POOH,
R/D wireline, gyro. Rig down wireline and gyro equipment.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/7/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 07, 2013 DEPTH 10150' PRESENT OPERATION: Drilling/Sliding
TIME: 2359 hrs YESTERDAY 10001'
24 HOUR FOOTAGE 149'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
9940' 11.65 320.15 9931.52'
9990' 17.74 320.33 9979.87'
10014' 21.46 318.57 10002.47'
10053' 27.97 319.12 10037.88'
10077' 31.53 321.75 10058.72'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
2 6" HCC MX-18HDX 5217224 3x14 / 0.04510 9843' 10001' 158' 7.7 Change Angle
2RR 6" HCC MX-18HDX 5217224 3x14 / 0.04510 10001'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 193.6 @ 10062' 2.5 @ 10120' 48.3 129.03 FT/HR
SURFACE TORQUE 1592 @ 10139' 899 @ 10138' 115.1 0.00 FT-LBS
WEIGHT ON BIT 28 @ 10049' 2 @ 10075' 17.9 19.26 KLBS
ROTARY RPM 40 @ 10131' 39 @ 10137' 3.8 0.00 RPM
PUMP PRESSURE 2063 @ 10056' 1183 @ 10125' 1815.1 1974.75 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10144' / 10112'
MW 9.5 VIS 47 PV 13 YP 16 Gels 6/8/9 FL 5.0 FC 1/2
SOL 3.6 NAF/W 0.0/93.8 SD - MBT 1.0 pH 9.6 ALK 1.2 Cl- 32000 Ca+ 3400
MWD SUMMARY
INTERVAL 10001' TO
TOOLS PDC bit on 2.1 degree mud motor with OnTrak
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 34 @ 10074' 1 @ 10003' 8.7 TRIP GAS 47 u
CUTTING GAS 0 @ 10150' 0 @ 10150' 0.0 WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 3785 @ 10074' 154 @ 10003' 1169.3 CONNECTION GAS HIGH 18 u
ETHANE (C-2) 285 @ 10074' 2 @ 10142' 63.0 CONNECTION GAS: AVG 13 u
PROPANE (C-3) 239 @ 10080' 7 @ 10007' 55.7 CONNECTION GAS: CURRENT
BUTANE (C-4) 167 @ 10080' 0 @ 10007' 30.4 CURRENT AVG BACKGROUND 4 u
PENTANE (C-5) 80 @ 10080' 1 @ 10128' 12.5
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous siltstone
PRESENT LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, tuffaceous claystone, and minor tuff
DAILY ACTIVITY
SUMMARY
POOH from 9820’ to 149’. L/D subs; download data from MWD; check motor bearings; inspect bit. Adjust degree of motor; M/U subs; M/U
directional BHA. Trips; RIH with 2.1 degree motor (RIh slow). Drill actual, slide drilling from 10001’ to 10072’ @ 250 GPM, 18/20K WOB.
Slide from 10072’ to 10125’. Rotate from 10125’ to 10139’. Slide ahead.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/8/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Greco, Grubb, Pederson
DATE: Aug 08, 2013 DEPTH 10435' PRESENT OPERATION: Drilling ahead
TIME: 2359 hrs YESTERDAY 10150'
24 HOUR FOOTAGE 285
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10267' 53.15 321.70 10196.03'
10302' 58.47 321.02 10215.69'
10331' 62.77 320.22 10229.92'
10367' 66.96 319.58 10245.21'
10393 68.17 321.10 10255.13'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
2RR 6" HCC MX-18HDX 5217224 3x14 / 0.04510 10001'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 7157.9 @ 10204' 0.7 @ 10310' 96.0 10.80 FT/HR
SURFACE TORQUE 3664 @ 10423' 400 @ 10204' 697.9 2809.82 FT-LBS
WEIGHT ON BIT 126 @ 10322' 1 @ 10231' 17.4 12.83 KLBS
ROTARY RPM 52 @ 10434' 1 @ 10378' 14.1 52.24 RPM
PUMP PRESSURE 2090 @ 10200' 1626 @ 10311' 1806.9 1817.94 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10440' / 10269'
MW 9.25 VIS 48 PV 12 YP 18 Gels 5/7/8 FL 4.0 FC 1/2
SOL 2.9 NAF/W 0.0/94.6 SD - MBT 1.0 pH 9.3 ALK 1.9 Cl- 30000 Ca+ 2800
MWD SUMMARY
INTERVAL 10001' TO
TOOLS PDC bit on 2.1 degree mud motor with OnTrak
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 225 @ 10201' 0 @ 10267' 53.6 TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 16499 @ 10217' 4 @ 10265' 3882.9 CONNECTION GAS HIGH 62 u
ETHANE (C-2) 2684 @ 10185' 0 @ 10265' 522.8 CONNECTION GAS: AVG 23 u
PROPANE (C-3) 3125 @ 10185' 0 @ 10267' 596.2 CONNECTION GAS: CURRENT 62 u
BUTANE (C-4) 1990 @ 10185' 0 @ 10267' 392.4 CURRENT AVG BACKGROUND 25 u
PENTANE (C-5) 1989 @ 10180' 0 @ 10267' 185.0
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY Tuffaceous siltstone, tuffaceous claystone, loose sand, tuffaceous sandstone
DAILY
ACTIVITY
SUMMARY
Slide from 10140’ to 10193’. Rotate from 10193’ to 10205’. Slide from 10205’ to 10230’. Rotate from 10230’ to 10245’. Slide from 10245’ to
10255’. Rig service. Slide from 10255’ to 10270’. Drill actual; slide drill from 10270’ to 10300’. Condition mud and circulate. Drop mud weight
from 9.5 to 9.2 (in, out). Rig service; blocks crown, top drive, draw tool, monitor well. Drill actual; slide drill from 10300’ to 10345’; back ream full
stand @ 43 RPM; 12/18K on bit.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/9/2013 file://C:\Documents and Settings\EpochAdmin\Desktop\20130808.htm
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 09, 2013 DEPTH 10509' PRESENT OPERATION: Testing BOPs
TIME: 2359 hrs YESTERDAY 10435'
24 HOUR FOOTAGE 74'
CASING INFORMATION 7' @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10331' 62.77 320.22 10229.92'
10367' 66.96 319.58 10245.21'
10393' 68.17 321.10 10255.13'
10431' 68.16 321.38 10269.26'
10454' 69.89 322.08 10277.50'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
2RR 6" HCC MX-18HDX 52217224 3x14 / 0.04510 10001' 10509' 508' 24.7 6/6-WT/A-E/I-ER/HR Hours/BOP test
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 127.8 @ 10449' 0.2 @ 10436' 16.3 19.10 FT/HR
SURFACE TORQUE 4191 @ 10482' 27 @ 10485' 2226.7 3727.08 FT-LBS
WEIGHT ON BIT 37 @ 10486' 7 @ 10470' 21.5 20.40 KLBS
ROTARY RPM 55 @ 10483' 13 @ 10458' 44.7 48.80 RPM
PUMP PRESSURE 1951 @ 10444' 1621 @ 10447' 1815.3 1788.19' PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10509' / 10294'
MW 9.2 VIS 47 PV 10 YP 17 Gels 5/6/7 FL 4.0 FC 1/2
SOL 2.9 NAF/W 0.0/94.6 SD - MBT 1.0 pH 9.0 ALK 2.00 Cl- 30000 Ca+ 2400
MWD SUMMARY
INTERVAL 10001' TO 10509'
TOOLS PDC bit on 2.1 degree mud motor with OnTrak
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 46 @ 10446' 7 @ 10503' 22.1 TRIP GAS
CUTTING GAS 0 @ 10509' 0 @ 10509' 0.0 WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 4984 @ 10501' 749 @ 10485' 2186.6 CONNECTION GAS HIGH 50 u
ETHANE (C-2) 280 @ 10446' 34 @ 10485' 124.9 CONNECTION GAS: AVG 50 u
PROPANE (C-3) 330 @ 10501' 30 @ 10485' 144.3 CONNECTION GAS: CURRENT
BUTANE (C-4) 227 @ 10501' 26 @ 10485' 103.2 CURRENT AVG BACKGROUND 2 u
PENTANE (C-5) 131 @ 10458' 20 @ 10503' 61.5
HYDROCARBON
SHOWS Fair to moderate oil show from 10180' to 10435'
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
1: 10180'-10435'
has fair to moderate
show.
1: Interval starts with a strong rating, where tuffaceous
sandstone and loose sand dominate above the carbonaceous
shale. Tuffaceous sandstone, conglomerate sand, and sand
make up majority of interval and accompanies consistent fair
oil ratings. Tuffaceous siltstone becomes most prominent from
10370' to 10435'; oil rating increases with increase in loose
sand.
1: Interval starts with
the high gas peak of
215 units. The rest of
the interval has an
average of 40-60
units, with peaks up to
100-120 units.
1: No visible oil stain, very slight to moderate odor,
70-90% sample fluorescence, moderate to
immediate yellow to bright yellow milky cut
fluorescence, moderate to bright yellow residual
ring fluorescence, no visible residue. Where oil
rating is fairly low, cut fluorescence was minimal,
but there was a faint residual ring fluorescence.
LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY Tuffaceous siltstone, loose sand, tuff, tuffaceous sandstone, sandstone
DAILY
ACTIVITY
SUMMARY
Rotate from 10396’ to 10446’. Slide from 10446’ to 10469’. Rotate from 10469’ to 10483’. Slide from 10483’ to 10487’. Rotate from 10487’ to
10500’. Rig service. Rotate from 10500’ to 10509’. Condition mud and circulate and reciprocate. Trips; POOH from 10509’ to 9787’; flow check;
monitor well (no flow). Condition mud and circulate; pump dry job. Trips; continue POOH from 9787’ to MWD. Download MWD date; L/D
directional tools. Pull wear bushing; install test plug.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/10/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 10, 2013 DEPTH 10509' PRESENT OPERATION: TIH while MAD-pass
TIME: 2359 hrs YESTERDAY 10509'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10331' 62.77 320.22 10229.92'
10367' 66.96 319.58 10245.21'
10393' 68.17 321.10 10255.13'
10431' 68.16 321.38 10269.26'
10454' 69.89 322.08 10277.50'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3 6" HCC #5 DP505FX 7137570 5x11 / 0.4640 10509
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - FT/HR
SURFACE TORQUE - @ - @ - FT-LBS
WEIGHT ON BIT - @ - @ - KLBS
ROTARY RPM - @ - @ - RPM
PUMP PRESSURE - @ - @ - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD
MW 9.2 VIS 41 PV 9 YP 15 Gels 5/7/8 FL 4.6 FC 1/2
SOL 3.0 NAF/W 0.0/94.6 SD - MBT 1.0 pH 8.6 ALK 2.00 Cl- 29000 Ca+ 2400
MWD SUMMARY
INTERVAL 10509' TO
TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS 620 u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 35 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonacoues shale, coal
PRESENT LITHOLOGY Tuffaceous siltstone, loose sand, tuff, tuffaceous sandstone, sandstone
DAILY ACTIVITY
SUMMARY
Test BOPs. Set wear bushing. L/D test joint. P/U BHA; change motor bend to 1.2; download tools. Fire drill; poor response; training in all
alarms and drills. Continue directional BHA; load nuclear source; shallow pulse test. RIH with 1.2 degree motor to 9772’. Cut and slip 92’ of
drill line. Rig service. Relog from 9850’ to 10509’ at 180 max ROP.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/11/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 11, 2013 DEPTH 10569' PRESENT OPERATION: Short trip and lube up
TIME: 2359 hrs YESTERDAY 10509'
24 HOUR FOOTAGE 60'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10349' 64.18 319.55 10237.96'
10412' 64.89 320.45 10265.05'
10453' 64.80 321.09 10282.47'
10475' 64.73 321.75 10291.85'
10507' 64.77 320.83 10305.50'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3 6" HCC #5 DP505FX 7137570 5x11 / 0.4640 10349'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 172.1 @ 10511' 2.3 @ 10512' 40.5 10.86 FT/HR
SURFACE TORQUE 4195 @ 10522' 2232 @ 10532' 1702.6 0.00 FT-LBS
WEIGHT ON BIT 25 @ 10556' 2 @ 10527' 7.5 10.69 KLBS
ROTARY RPM 48 @ 10509' 6 @ 10535' 24.1 0.00 RPM
PUMP PRESSURE 2022 @ 10520' 1361 @ 10561' 1651.6 1468.65 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10569' / 10332'
MW 9.2 VIS 42 PV 9 YP 17 Gels 5/7/8 FL 4.6 FC 1/2
SOL 3.0 NAF/W 0.0/94.6 SD - MBT 1.0 pH 8.8 ALK 1.60 Cl- 28500 Ca+ 2400
MWD SUMMARY
INTERVAL 10349' TO
TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 58 @ 10541' 4 @ 10569.00000 22.5 TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 6184 @ 10541' 465 @ 10552' 2092.2 CONNECTION GAS HIGH
ETHANE (C-2) 555 @ 10541' 58 @ 10552' 166.0 CONNECTION GAS: AVG
PROPANE (C-3) 706 @ 10541' 57 @ 10552' 212.2 CONNECTION GAS: CURRENT
BUTANE (C-4) 392 @ 10541' 31 @ 10552' 118.5 CURRENT AVG BACKGROUND 8 u
PENTANE (C-5) 235 @ 10541' 5 @ 10562' 65.1
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY Tuffaceous siltstone, loose sand, tuffaceous claystone, tuffaceous sandstone
DAILY ACTIVITY
SUMMARY
Tight hole / washdown from 10349’ to 10409’. Directional work; MAD pass; W/R from 10409’ to 10509’. Drill actual from 10509’ to 10557’.
Slide from 10557’ to 10566’. Spot lube pill and reciprocate pipe. Slide from 10566’ to 10569’. Short trip 6 stands two times from 10569’ to
10221’.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/12/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 12, 2013 DEPTH 10569' PRESENT OPERATION: Circulating B/U at 10569'
TIME: 2359 hrs YESTERDAY 10509'
24 HOUR FOOTAGE 60'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10349' 64.18 319.55 10237.96'
10412' 64.89 320.45 10265.05'
10453' 64.80 321.09 10282.47'
10475' 64.73 321.75 10291.85'
10507' 64.77 320.83 10305.50'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3 6" HCC #5 DP505FX 7137570 5x11 / 0.4640 10349' 10569' 220' 4.0 1-1-WT-A-X-I-BT-BHA BHA
4 6" HCC #6 MX-18HDX 5217225 3x14 / 0.4510 10569'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 172.1 @ 10511' 2.3 @ 10512' 40.5 10.86 FT/HR
SURFACE TORQUE 4195 @ 10522' 2232 @ 10532' 1702.6 0.00 FT-LBS
WEIGHT ON BIT 25 @ 10556' 2 @ 10527' 7.5 10.69 KLBS
ROTARY RPM 48 @ 10509' 6 @ 10535' 24.1 0.00 RPM
PUMP PRESSURE 2022 @ 10520' 1361 @ 10561' 1651.6 1468.65 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10570' / 10333'
MW 9.25 VIS 40 PV 9 YP 17 Gels 5/6/7 FL 4.8 FC 1/2
SOL 3.3 NAF/W 0.0/94.3 SD - MBT 1.0 pH 8.5 ALK 1.40 Cl- 29000 Ca+ 2400
MWD SUMMARY
INTERVAL 10569' TO
TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 58 @ 10541' 4 @ 10569' 22.5 TRIP GAS 544 u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 6184 @ 10541' 465 @ 10552' 2092.2 CONNECTION GAS HIGH
ETHANE (C-2) 555 @ 10541' 58 @ 10552' 166.0 CONNECTION GAS: AVG
PROPANE (C-3) 706 @ 10541' 57 @ 10552' 212.2 CONNECTION GAS: CURRENT
BUTANE (C-4) 392 @ 10541' 31 @ 10552' 118.5 CURRENT AVG BACKGROUND 12 u
PENTANE (C-5) 235 @ 10541' 5 @ 10562' 65.1
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, looze sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY Tuffaceous siltstone, loose sand, tuffaceous claystone. tuffaceous sandstone
DAILY ACTIVITY
SUMMARY
Circulate bottoms up; reciprocate pipe. POOH from 10569 to 7000’. Trips; TOOH from 7000’ to 292’. Directional work; L/D BHA, unload nuke,
DN link tools. Directional work; P/U new mud motor, orient, load nukes. Condition mud and circulate; shallow pulse test (test good). Trips from
surface to 2929’. Trips from 2929’ to 10569’; circulate B/U. Drill/slide ahead.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/13/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 13, 2013 DEPTH 10602' PRESENT OPERATION: RIH after regaining circ. and circulating B/U
TIME: 2359 hrs YESTERDAY 10569'
24 HOUR FOOTAGE 33'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10349' 64.18 319.55 10237.96'
10412' 64.89 320.45 10265.05'
10453' 64.80 321.09 10282.47'
10475' 64.73 321.75 10291.85'
10507' 64.77 320.83 10305.50'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
4 6" HCC #6 MX-18HDX 5217225 3x14 / 0.4510 10569'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 66.5 @ 10592' 2.9 @ 10597' 18.1 14.27 FT/HR
SURFACE TORQUE 4921 @ 10592' 709 @ 10574' 1190.0 0.00 FT-LBS
WEIGHT ON BIT 23 @ 10579' 6 @ 10597' 15.6 10.27 KLBS
ROTARY RPM 40 @ 10591' 10 @ 10582' 10.0 0.00 RPM
PUMP PRESSURE 2256 @ 10589' 1468 @ 10569' 1953.6 1483.49 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10570' / 10333'
MW 9.35 VIS 40 PV 9 YP 16 Gels 5/6/7 FL 5.0 FC 1/2
SOL 3.3 NAF/W 0.0/94.3 SD - MBT 1.0 pH 8.5 ALK 1.40 Cl- 29000 Ca+ 2400
MWD SUMMARY
INTERVAL 10569' TO
TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 28 @ 10576' 3 @ 10601' 10.2 TRIP GAS
CUTTING GAS @ @ WIPER GAS 5910 u
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 1708 @ 10576' 257 @ 10569' 480.2 CONNECTION GAS HIGH
ETHANE (C-2) 142 @ 10576' 26 @ 10569' 42.0 CONNECTION GAS: AVG
PROPANE (C-3) 153 @ 10576' 28 @ 10569' 44.2 CONNECTION GAS: CURRENT
BUTANE (C-4) 98 @ 10576' 12 @ 10569' 30.1 CURRENT AVG BACKGROUND 45 u
PENTANE (C-5) 79 @ 10576' 12 @ 10569' 26.0
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY NO RETURNS... Tuffaceous siltstone, tuffaceous claystone, loose sand, tuffaceous sandstone before lost returns
DAILY
ACTIVITY
SUMMARY
Slide from 10568’ to 10588’. Rotate from 10588’ to 10593’. Hole taking mud; idle pump and send LCM down hole. Rotate from 10593’ to 10599’.
Slide from 10599’ to 10602’; drilling with partial returns. Lost returns; pump LCM; build 30 lbs LCM in active; work to re-establish returns;
reciprocate pipe. Condition mud and circulate; lost circ; work pipe; spot pills on bottom; pump 30 BBL down backside. Condition mud and
circulate; drop ball shift well commander; break circulation; pump 20 BBL. Condition mud and circulate; break circulation @ 4 BBL, pump 2nd 80
lb BBL pill. Trips; stand back 2 stands while pill soaks. Condition mud and circulate; pump down backside with holefill. Regain circulation;
circulate bottoms up; 5910 units of gas.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/14/2013 file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\H ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 14, 2013 DEPTH 10824' PRESENT OPERATION: Troubleshooting MWD tools
TIME: 2359 hrs YESTERDAY 10602'
24 HOUR FOOTAGE 222'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10507' 64.77 320.83 10305.50'
10537' 64.88 321.53 10318.26'
10602' 68.99 324.03 10343.73'
10662' 69.97 325.09 10364.76'
10725' 72.06 324.80 10385.25'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
4 6" HCC #6 MX-18HDX 5217225 3x14 / 0.4510 10569'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 141.0 @ 10752' 1.3 @ 10820' 26.5 20.89 FT/HR
SURFACE TORQUE 9118 @ 10818' 63 @ 10797' 2472.7 1376.42 FT-LBS
WEIGHT ON BIT 52 @ 10771' 0 @ 10684' 17.2 32.62 KLBS
ROTARY RPM 51 @ 10756' 1 @ 10771' 31.6 0.00 RPM
PUMP PRESSURE 2131 @ 10817' 1407 @ 10691' 1783.5 1822.33 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10823' / 10413'
MW 9.3 VIS 42 PV 9 YP 18 Gels 6/7/8 FL 4.8 FC 1/2
SOL 3.7 NAF/W 0.0/94.0 SD - MBT 1.0 pH 9.3 ALK 0.80 Cl- 28500 Ca+ 2400
MWD SUMMARY
INTERVAL 10569' TO
TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 545 @ 10607' 8 @ 10602' 115.2 TRIP GAS
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 19626 @ 10683' 162 @ 10602' 2719.7 CONNECTION GAS HIGH
ETHANE (C-2) 2126 @ 10686' 21 @ 10658' 184.6 CONNECTION GAS: AVG 11 u
PROPANE (C-3) 3383 @ 10606' 52 @ 10770' 276.7 CONNECTION GAS: CURRENT 18 u
BUTANE (C-4) 6169 @ 10607' 36 @ 10794' 363.1 CURRENT AVG BACKGROUND 50 u
PENTANE (C-5) 5289 @ 10607' 32 @ 10801' 477.8
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, loose sand, conglomerate sand, tuffaceous siltstone, tuff, tuffaceous claystone, carbonaceous shale, coal
PRESENT LITHOLOGY Sandstone, tuff, tuffaceous sandstone, loose sand
DAILY ACTIVITY
SUMMARY
Dropped ball to deactivate well commander. TIH 5 stands from 10341’ to 10585’; tag fill @ 10585’; wash down to bottom from 10585’ to
10602’. Slide from 10602’ to 10620’. Drill from 10620’ to 10625’. Perform BOP drill (well secured in 45 seconds). Drill from 10625’ to 10716’.
Rig service. Drill from 10716’ to 10782’. Drill from 10782 to 10824’.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/15/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 15, 2013 DEPTH 10824' PRESENT OPERATION: TIH after fixing MWD tools
TIME: 2359 hrs YESTERDAY 10824'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10507' 64.77 320.83 10305.50'
10537' 64.88 321.53 10318.26'
10602' 68.99 324.03 10343.73'
10662' 69.97 325.09 10364.76'
10725 72.06 324.80 10385.25'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
4 6" HCC #6 MX-18HDX 5217225 3x14 / 0.4510 10569' 10824' 255' 14.1 1-1-WT-A-E-I-ER-DTF DTF
5 6" HCC #7 MX-18HDX 5217177 3x14 / 0.4510 10824'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 10823' / 10413'
MW 9.2 VIS 39 PV 7 YP 17 Gels 5/6/7 FL 4.8 FC 1/2
SOL 3.1 NAF/W 0.0/94.5 SD - MBT 1.0 pH 8.5 ALK 0.50 Cl- 29000 Ca+ 2400
MWD SUMMARY
INTERVAL 10824' TO
TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 10 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Tuffaceous sandstone, loose sand, conglomerate sand, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY Sandstone, tuff, tuffaceous sandstone, loose sand
DAILY
ACTIVITY
SUMMARY
Troubleshoot MWD; tool quit pulsing. Rig service; greased DW; check oil. Build a dry job and prep rig floor to TOH. TOH from 10824’ to 9844’.
Clean floor; pump dry job. TOH from 9844’ to 8041’. Bit hours = 14.1 hours. TOH from 8041’ to directional tools. Unload radioactive sources/
L/W Monel; D/L data; P/U Monel; M/U new bit scribe motor; upload data. Finish loading data; pull and clean filter; M/U Monel; S/M with MWD
before loading R/A sources; load R/A sources; surface test MWD tool. TIH from 349’ to 9000’; slip and cut 55’ drill line.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/16/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 16, 2013 DEPTH 11029' PRESENT OPERATION: Soaking LCM pills and building mud volume
TIME: 2359 hrs YESTERDAY 10824'
24 HOUR FOOTAGE 205'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10662' 69.97 325.09 10364.76'
10725' 72.06 324.80 10385.25'
10787' 73.65 326.84 10403.53'
10851' 77.08 325.30 10419.70'
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
5 6" HCC #7 MX-18HDX 5217177 3x14 / 0.4510 10824'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 229.4 @ 10857' 1.1 @ 10864' 43.6 11.25 FT/HR
SURFACE TORQUE 9432 @ 10924' 1376 @ 10824' 7037.0 7959.46 FT-LBS
WEIGHT ON BIT 52 @ 10864' 6 @ 10963' 19.5 14.07 KLBS
ROTARY RPM 61 @ 11029' 42 @ 10843' 45.7 61.44 RPM
PUMP PRESSURE 2280 @ 10923' 1822 @ 10824' 2181.1 2093.18 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11029' / 10455'
MW 9.2 VIS 39 PV 7 YP 17 Gels 5/6/7 FL 5.0 FC 1/2
SOL 3.2 NAF/W 0.0/94.5 SD - MBT 1.0 pH 8.5 ALK 0.40 Cl- 28000 Ca+ 2400
MWD SUMMARY
INTERVAL 10824' TO
TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 112 @ 10991' 13 @ 10919' 54.7 TRIP GAS 237 u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 14865 @ 10991' 518 @ 10826' 5881.4 CONNECTION GAS HIGH 26 u
ETHANE (C-2) 773 @ 10966' 24 @ 10826' 218.3 CONNECTION GAS: AVG 22 u
PROPANE (C-3) 572 @ 10967' 32 @ 10826' 215.1 CONNECTION GAS: CURRENT 18 u
BUTANE (C-4) 352 @ 10967' 19 @ 10826' 115.7 CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) 288 @ 10966' 12 @ 10829' 55.0
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY Conglomerate sand, tuff, conglomerate
DAILY
ACTIVITY
SUMMARY
Slip and cut 55’ of drill line. Rig service; greased TD, DW, blocks, swivel; checked oil in DW, gens, and MP. TIH from 9015’ to 10000’. TIH from
10000’ to 10824’. Drill from 10824’ to 11029’. Lost circulation. Build LCM pill; pump 20 BBL of LCM. Build and pump second LCM pill. TOH from
11029’ to 10967’; 2 stands of DP. Let pill soak. Fill both sides of hole with 71 BBL of mud. Build 80 lb per BBL LCM pill; drop commander ball #1;
drop commander ball #2. TIH from 10967’ to 11029’; 2 stands of DP. Pump 80 lb per BBL LCM pill. TOH from 11029 to 10967’. Let 80 lb per BBL
LCM pill soak; build volume. Try to fill hole with 77 BBL of mud. Build 110 lb per BBL LCM pill. Pump 22 BBL of pill and chase with 120 BBL. Wait
on pill to soak.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/17/2013 file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\H ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 17, 2013 DEPTH 11029' PRESENT OPERATION: TOH for BOP test
TIME: 2359 hrs YESTERDAY 11029'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10662' 69.97 325.09 10364.76'
10725' 72.06 324.80 10385.25'
10787' 73.65 326.84 10403.53'
10851' 77.08 325.30 10419.70'
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
5 6" HCC #7 MX-18HDX 5217177 3x14 / 0.4510 10824' 11029' 205' 6.7
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11029' / 10455'
MW 9.2 VIS 41 PV 8 YP 15 Gels 5/6/7 FL 4.8 FC 1/2
SOL 3.2 NAF/W 1.0/93.5 SD - MBT 1.0 pH 8.1 ALK 0.40 Cl- 28500 Ca+ 2000
MWD SUMMARY
INTERVAL 10824' TO
TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS 6668 u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 500 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY Conglomerate sand, tuff, conglomerate
DAILY
ACTIVITY
SUMMARY
Try to fill back side with 75 BBL; no sign. Build 110 lb pr BBL LCM pill. Pump 19 BBL of 110 lb per BBL LCM pill; chase with 120 BBL; RIH 1
stand of DP. TOH 7 stands from 11029’ to 10524’/ Let LCM pill soak in formation; build mud volume and LCM pill. TIH from 10553’ to 11029’
Pump LCM pill and chase with 1300 strokes; had returns cut with oil; continue CBU; close bag; continue circulating through choke/gas buster
(surface to surface = 7500 strokes). Shut down pump; closed choke monitor for pressure. TOH 19 stands. Monitor well with trip tank. Circulate
surface to surface. Drop well commander ball to close up circulating sub; dropped second ball to open circulating sub. Try to open well
commander @ 3300 PSI with no luck. TOH from 9824’.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/18/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 18, 2013 DEPTH 11029' PRESENT OPERATION: TIH to drill ahead
TIME: 2359 hrs YESTERDAY 11029'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10662' 69.97 325.09 10364.76'
10725' 72.06 324.80 10385.25'
10787' 73.65 326.84 10403.53'
10851' 77.08 325.30 10419.70'
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
5 6" HCC #7 MX-18HDX 5217177 3x14 / 0.4510 10824' 11029' 205' 6.7 1-1-WT-A-E-I BOP test
6 6" HCC #8 DP505FX 7034965 5x11 / 0.4640 11029'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11029' / 10455'
MW 9.2 VIS 46 PV 10 YP 15 Gels 6/7/8 FL 4.8 FC 1/2
SOL 3.3 NAF/W 1.0/93.5 SD - MBT 1.0 pH 8.6 ALK 0.30 Cl- 27500 Ca+ 2000
MWD SUMMARY
INTERVAL 11029' TO
TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 440 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY Conglomerate sand, tuff, conglomerate
DAILY
ACTIVITY
SUMMARY
Continue TOH. Directional work; break apart commander sub and lay out monels. S/M with LWD and rig crew before unloading radioactive
sources. Directional work; unload sources and down link MWD tool; drain motor; break off bit. P/U test joint and remove wear bushing/flush
through stack and lines. Conduct BOP tests. Install wear bushing. P/U directional tools. S/M with rig crew and DD. Directional work; M/U bit
motor scribe and make up MWD. S/M with LWD and rig crew for radioactive sources. Directional work; load radioactive sources and finish
making up BHA and shallow test MWD. TIH from 175’.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/19/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 19, 2013 DEPTH 11067' PRESENT OPERATION: Soaking LCM pills
TIME: 2359 hrs YESTERDAY 11029'
24 HOUR FOOTAGE 38'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10662' 69.97 325.09 10364.76'
10725' 72.06 324.80 10385.25'
10787' 73.65 326.84 10403.53'
10851' 77.08 325.30 10419.70'
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
6 6" HCC #8 DP505FX 7034965 5x11 / 0.4640 11029'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 195.1 @ 11047' 11.2 @ 11029' 100.7 112.09 FT/HR
SURFACE TORQUE 7959 @ 11029' 5782 @ 11041' 7111.7 7132.64 FT-LBS
WEIGHT ON BIT 14 @ 11029' 1 @ 11046' 3.9 6.91 KLBS
ROTARY RPM 61 @ 11029' 51 @ 11032' 53.8 52.39 RPM
PUMP PRESSURE 2093 @ 11029' 563 @ 11041' 1089.9 1371.16 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11029' / 10455'
MW 9.2 VIS 46 PV 8 YP 15 Gels 5/6/7 FL 4.2 FC 1/2
SOL 3.4 NAF/W 0.1/94.0 SD - MBT 1.0 pH 9.4 ALK 0.50 Cl- 30500 Ca+ 800
MWD SUMMARY
INTERVAL 11029' TO
TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS 1994 u
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before lost circulation at 11029'
DAILY
ACTIVITY
SUMMARY
Condition mud and circulate bottoms up. TIH from 10026’ to 10595’. Condition mud and circulate; wash ream tight spot at 10603’. TIH from 10594’
to 11029’. Lose returns while TIH. Drill from 11029’ to 11036’. Build and pump 23 BBL LCM pill and chase with 2229 strokes. TOH 2 stands. Let
LCM pill soak; pumped 54 BBL on back side; build volume. RIH from 10880’ to 11036’. Drill from 11036’ to 11067’. TOH from 11067’ to 10877’.
Pump 23 BBL of LCM pill and chase with 2200 strokes. Let LCM pill soak; build volume. Drop ball to open well commander; drop second ball to
isolate BHA. Total mud loss = 784 BBL. Pump 21 BBL of 80 lb per BBL LCM pill; chase with 128 BBL. TOH from 10887’ to 10625’. Wait on LCM
pill to soak into formation; build volume. Pump 40 BBL down DP and 25 BBL down backside to try to fill hole. Build 80 lb per BBL LCM pill. Pump
25 BBL of 80 lb per BBL LCM pill; chase with 128 BBL. TOH from 10954’ to 10686’. Let pill soak into formation. Pump 25 BBL down back side of
hole and 45 BBL down DP; no returns.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/20/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 20, 2013 DEPTH 11099' PRESENT OPERATION: Building mud volume
TIME: 2359 hrs YESTERDAY 11067'
24 HOUR FOOTAGE 32'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10662' 69.97 325.09 10364.76'
10725' 72.06 324.80 10385.25'
10787' 73.65 326.84 10403.53'
10851' 77.08 325.30 10419.70'
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
6 6" 6" HCC #8 DP505FX 7034965 5x11 / 0.4640 11029'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 220 @ 11069' 50.4 @ 11097' 158.2 199.67 FT/HR
SURFACE TORQUE 8433 @ 11096' 6324 @ 11068' 7580.6 7918.16 FT-LBS
WEIGHT ON BIT 14 @ 11097' 3 @ 11069' 8.1 9.77 KLBS
ROTARY RPM 54 @ 11088' 52 @ 11067' 55.2 52.78 RPM
PUMP PRESSURE 1575 @ 11099' 848 @ 11068' 1354.8 1575.54 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11099' / 10465'
MW 8.9 VIS 49 PV 8 YP 15 Gels 5/6/7 FL 4.8 FC 1/2
SOL 1.7 NAF/W 0.0/96.0 SD - MBT 1.0 pH 8.6 ALK 0.50 Cl- 2800 Ca+ 200
MWD SUMMARY
INTERVAL 11029' TO
TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff and conglomerate before lost circulation at 11029'
DAILY
ACTIVITY
SUMMARY
Build volume and 110 lb per BBL LCM pill. Work tight spot at 10781’. Pump 20 BBL of 110 lb per BBL LCM pill and chase with 129 BBL; pressure
reached 545 PSI. Let pill soak into formation; monitor well with trip tank. Pump down back side with trip tank and down DP. Build volume and 110
lb per BBL LCM pill. Build volume and 110 lb per BBL LCM pill. Drop ball to close well commander. RIH from 10628’ to 11067’. Drill from 11067’
to 11099’. Drop ball to open well commander; drop second ball to isolate BHA. Pump 21 BBL of 110 lb per BBL LCM pill; chase with 2200
strokes. Let LCM pill soak; build volume. Rig service (function pipe rams 4 seconds). Continue to let LCM pill soak while building mud volume.
Pump 22 BBL of 11 lb per BBL LCM pill; chase with 2200 strokes. Let 110 lb per BBL LCM pill soak into formation. Pump 250 BBL down
backside. Build volume.
CANRIG PERSONNEL ON BOARD: Resch, Sherry, Hillegeist, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/21/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 21, 2013 DEPTH 11099' PRESENT OPERATION: Building LCM pills
TIME: 2359 hrs YESTERDAY 11099'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10662' 69.97 325.09 10364.76'
10725' 72.06 324.80 10385.25'
10787' 73.65 326.84 10403.53'
10851' 77.08 325.30 10419.70'
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
6 6" HCC #8 DP505FX 7034965 5x11 / 0.4640 11029'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION - @ - @ - - FT/HR
SURFACE TORQUE - @ - @ - - FT-LBS
WEIGHT ON BIT - @ - @ - - KLBS
ROTARY RPM - @ - @ - - RPM
PUMP PRESSURE - @ - @ - - PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11099' / 10465'
MW 8.9 VIS 46 PV 9 YP 15 Gels 7/8/10 FL 4.2 FC 1/2
SOL 1.7 NAF/W 2.0/94.0 SD - MBT 1.0 pH 8.2 ALK 0.40 Cl- 28500 Ca+ 200
MWD SUMMARY
INTERVAL 11029' TO
TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS - @ - @ - TRIP GAS 6460 u
CUTTING GAS - @ - @ - WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) - @ - @ - CONNECTION GAS HIGH
ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG
PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT
BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 300 u
PENTANE (C-5) - @ - @ -
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal
PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before lost circulation at 11029'
DAILY
ACTIVITY
SUMMARY
Pump 75.5 BBL of 130 lb per BBL LCM pill. Received returns at 1681 strokes (97 BBL). Oil over shakers; shut in well at 5300 units of gas read;
Max gas 6460 units; record pressures; circulate through choke. Circulate B/U. Monitor well. TOH 5 stands. Circulate gas out. Drop ball to close
well commander. Troubleshoot MWD tool. TOH from 10664’ to 9765’. Troubleshoot MWD tool. TIH from 9767’ to 11099’; bridge at 11004’; lost
circulation and returns. Build 3 120 lb per BBL LCM pill; monitor well from trip tank; pumped 50 BBL on backside with no returns. Dropped ball
#1; pressured up to 1183 PSI. Dropped ball #2; pressured up to 1583 PSI. Pump 47.7 BBL of 120 lb per BBL LCM pill; chase with 127.5 BBL.
CANRIG PERSONNEL ON BOARD: Sherry, Hillegeist, Grundin, Hudgins __DAILY COST: $3460
REPORT BY: Mike Sherry
Page 1 of 1Daily Report
8/22/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 22, 2013 DEPTH 11161' PRESENT OPERATION: Drilling Blind
TIME: 23:59 hrs YESTERDAY 11099'
24 HOUR FOOTAGE 62'
CASING INFORMATION
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
6 6 hHHC #8 DP505FX 7034965 5x11/0.4640 11029' In Hole 132' 1.7
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 199.7 @ 11099' 56.6 @ 11125' 83.5 162.2 FT/HR
SURFACE TORQUE 9206 @ 11129' 5220 @ 11134' 4950.7 7170.0 FT-LBS
WEIGHT ON BIT 9 @ 11099' 0 @ 11141' 0.7 1.9 KLBS
ROTARY RPM 56 @ 11134' 52 @ 11099' 38.1 55.1 RPM
PUMP PRESSURE 2057 @ 11146' 1316 @ 11134' 1261.9 1811.1 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11099'
MW 8.9 VIS 46 PV 9 YP 15 Gels 7/8/10 FL 4.2 FC 1/2
SOL 1.7 NAF/W 2.0/94.0 SD - MBT 1.0 pH 8.2 ALK 0.40 Cl- 28,500 Ca+ 200
MWD SUMMARY
INTERVAL 11029' TO 11091'
TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub (commo lost @ 11092').
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 0 @ 11161' 0 @ 11161' 0.0 TRIP GAS 244u
CUTTING GAS 0 @ 11161' 0 @ 11161' 0.0 WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 0 @ 11161' 0 @ 11161' 0.0 CONNECTION GAS HIGH
ETHANE (C-2) 0 @ 11161' 0 @ 11161' 0.0 CONNECTION GAS: AVG
PROPANE (C-3) 0 @ 11161' 0 @ 11161' 0.0 CONNECTION GAS: CURRENT
BUTANE (C-4) 0 @ 11161' 0 @ 11161' 0.0 CURRENT AVG BACKGROUND 0u
PENTANE (C-5) 0 @ 11161' 0 @ 11161' 0.0
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY
ACTIVITY
SUMMARY
Pump 47.7 BBL of 120PPB LCM pill and chase with 127.5 BBL spot pill @ 10986'. Service rig and let pill soak into formation. Pump 17 BBL
down back side with no returns. Build volume and 130 PPB lcm pill. RIH from 9764' to 11064'. Drop ball to close well commander.drill from
11099' to 11161'. Monitor well and build LCM pills. Drop ball to open well commander and drop second ball to isolate BHA. Pump 60 BBL of 130
PPB LCM pill and chase with 2200 strokes. TOOH from 11086' to 9766'. Let LCM pill soak into formation. TIH from 9766' to 11161'. Start drilling
from 11161'.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
8/23/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 23, 2013 DEPTH 11397' PRESENT OPERATION: Testing BOP's
TIME: 23:59 hrs YESTERDAY 11161'
24 HOUR FOOTAGE 236'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
6 6" HHC #8 DP505FX 7034965 5x11/0.4640 11029' In Hole 371' 2.45 No Survey
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 13941.2 @ 11370' 4.4 @ 11254' 406.4 7115.5 FT/HR
SURFACE TORQUE 11025 @ 11355' 6203 @ 11364' 7227.8 7832.3 FT-LBS
WEIGHT ON BIT 35 @ 11202' 1 @ 11161' 11.6 13.3 KLBS
ROTARY RPM 56 @ 11382' 51 @ 11179' 52.7 54.1 RPM
PUMP PRESSURE 3024 @ 11381' 1631 @ 11195' 2166.6 2167.0 PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11161'
MW 8.9 VIS 52 PV 11 YP 14 Gels 7/8/9 FL 5.0 FC 1/2
SOL 1.6 NAF/W 0.0/96.0 SD MBT 1.0 pH 8.4 ALK 0.50 Cl- 29,000 Ca+ 200
MWD SUMMARY
INTERVAL 11029' TO 11091'
TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub (commo lost @ 11092').
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 0 @ 11397' 0 @ 11397' 0.0 TRIP GAS 78u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) 0 @ 11397' 0 @ 11397' 0.0 CONNECTION GAS HIGH 0u
ETHANE (C-2) 0 @ 11397' 0 @ 11397' 0.0 CONNECTION GAS: AVG 0u
PROPANE (C-3) 0 @ 11397' 0 @ 11397' 0.0 CONNECTION GAS: CURRENT 0u
BUTANE (C-4) 0 @ 11397' 0 @ 11397' 0.0 CURRENT AVG BACKGROUND 0u
PENTANE (C-5) 0 @ 11397' 0 @ 11397' 0.0
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY ACTIVITY
SUMMARY
Drilling ahead from 11161' to 11400' MD, circulate bottoms up, trip out of hole from 11400' to 10788', pump 100 BBL down backside, trip out of
hole from 11788' to 9773', service rig and monitor well, slip and cut 156' of drill line, continue to service rig, fill back side with 200 BBL, trip out
of hole from 9767' to 2606', fill backside with 450 BBL with no returns, trip out of hole and lay down bha and mwd tools.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
8/24/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 24, 2013 DEPTH 11397' PRESENT OPERATION: Circulating
TIME: 23:59 hrs YESTERDAY 11397'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
6 6" HHC #8 DP505FX 7034965 5x11/0.4640 11029' 11400 371' 2.45 No Survey
6 RR1 6" HHC #8 DP505FX 7034965 5x11/0.4640 11400' In Hole 0 2.45
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION @ @ FT/HR
SURFACE TORQUE @ @ FT-LBS
WEIGHT ON BIT @ @ KLBS
ROTARY RPM @ @ RPM
PUMP PRESSURE @ @ PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400'
MW 8.9 VIS 45 PV 11 YP 13 Gels 5/7/8 FL 4.6 FC 1/2
SOL 1.6 NAF/W 0.0/96.0 SD - MBT 1.0 pH 9.7 ALK 0.60 Cl- 29,000 Ca+ 120
MWD SUMMARY
INTERVAL 11400' TO 11400'
TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub.
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS @ @ TRIP GAS 1193u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ CONNECTION GAS HIGH
ETHANE (C-2) @ @ CONNECTION GAS: AVG
PROPANE (C-3) @ @ CONNECTION GAS: CURRENT
BUTANE (C-4) @ @ CURRENT AVG BACKGROUND
PENTANE (C-5) @ @
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY
ACTIVITY
SUMMARY
Pull wear bushing, install test plug and make up test equipment, test annular and choke to 250psi and 2500psi, rig down test plug and test joint,
install wear bushing, pick up tools-scribe motor and load data, run in hole to 11020', wash and ream from 11020' to 11069' and circulate out gas
and oil, shut in well due to gas and oil and monitor pressure through choke, open well and pull 3 stands to get out of tight hole, shut in well and
circulate through choke. Max gas last 24 hours 1193 units @ 11069'.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
8/25/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 25, 2013 DEPTH 11397' PRESENT OPERATION: Pulling Out Of Hole
TIME: 23:59 hrs YESTERDAY 11397'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
6 RR1 6" HHC #8 DP505FX 7034965 5x11/0.4640 11400' 11400 0 2.45 TD
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION @ @ FT/HR
SURFACE TORQUE @ @ FT-LBS
WEIGHT ON BIT @ @ KLBS
ROTARY RPM @ @ RPM
PUMP PRESSURE @ @ PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400'
MW 8.9 VIS 45 PV 11 YP 13 Gels 6/7/8 FL 5.4 FC 1/2
SOL 1.6 NAF/W 0.0/96.0 SD - MBT 1.0 pH 8.9 ALK 0.40 Cl- 29,000 Ca+ 120
MWD SUMMARY
INTERVAL 11400' TO 11400'
TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub.
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS @ @ TRIP GAS 5172u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ CONNECTION GAS HIGH
ETHANE (C-2) @ @ CONNECTION GAS: AVG
PROPANE (C-3) @ @ CONNECTION GAS: CURRENT
BUTANE (C-4) @ @ CURRENT AVG BACKGROUND
PENTANE (C-5) @ @
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY
ACTIVITY
SUMMARY
Pull out of hole to 10879, shut in well and circulate through choke, shut in well and monitor pressure up to 40psi and circulate through choke,
circulate bottoms up and monitor well for gas, shut in well and circulate surface to surface through choke, drop ball to open well commander and
second ball to isolate BHA, run in hole 2 stands, pump 65 BBL 100 lbs/BBL LCM and chase with 2110 strokes, pull out of hole from 11006' to
9769', fill hole to monitor well with 10 BBL every half hour pumped 75 BBL down back side with no returns and continued to monitor well, pull out
of hole from 9776' to 4968', monitored well for gas, pull out of hole from 4968' to 5984' at report time. Max gas last 24 hours 5172 units circulating
@ 10877'.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
8/26/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 26, 2013 DEPTH 11397' PRESENT OPERATION: Make Up BHA
TIME: 23:59 hrs YESTERDAY 11397'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
6 RR1 6" HHC #8 DP505FX 7034965 5x11/0.4640 11400' 11400 0 2.45 TD
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION @ @ FT/HR
SURFACE TORQUE @ @ FT-LBS
WEIGHT ON BIT @ @ KLBS
ROTARY RPM @ @ RPM
PUMP PRESSURE @ @ PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400'
MW 8.9 VIS 60 PV 14 YP 14 Gels 5/6/7 FL 5.8 FC 1/2
SOL 1.5 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.6 ALK 0.60 Cl- 29,500 Ca+ 80
MWD SUMMARY
INTERVAL 11400' TO 11400'
TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub.
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS @ @ TRIP GAS 240u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ CONNECTION GAS HIGH
ETHANE (C-2) @ @ CONNECTION GAS: AVG
PROPANE (C-3) @ @ CONNECTION GAS: CURRENT
BUTANE (C-4) @ @ CURRENT AVG BACKGROUND
PENTANE (C-5) @ @
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY
ACTIVITY
SUMMARY
Pull out of hole from 5984' to 4968', monitor well for gas, pull out of hole from 4968' to 2155', monitor well for gas, pull out of hole from 6155' to
200', lay down BHA and unload data sources, remove wear bushing, install test plug, test BOP's, lay down test joint and fill stack with water, rig
up to test blind rams, do draw down test on accumulator, pull test plug and install wear bushing, blow down choke manifold and line up for hard
shut in, service rig, making up BHA at report time. Max gas last 24 hours 240 units.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
8/27/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson River Field DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 27, 2013 DEPTH 11397' PRESENT OPERATION: Washing and Reaming
TIME: 23:59 hrs YESTERDAY 11397'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.21 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
6 RR1 6" HHC #8 DP505FX 7034965 5x11/0.4640 11400' 11400 0 2.45 TD
7 6" MX-18HDX 5217177 3x14/0.4510 11400' In Hole 0 0
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION @ @ FT/HR
SURFACE TORQUE @ @ FT-LBS
WEIGHT ON BIT @ @ KLBS
ROTARY RPM @ @ RPM
PUMP PRESSURE @ @ PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400'
MW 8.9 VIS 60 PV 13 YP 14 Gels 5/6/7 FL 5.4 FC 1/2
SOL 1.6 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.4 ALK 0.50 Cl- 29,000 Ca+ 80
MWD SUMMARY
INTERVAL 11400' TO 11400'
TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub.
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS @ @ TRIP GAS 2347u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ CONNECTION GAS HIGH
ETHANE (C-2) @ @ CONNECTION GAS: AVG
PROPANE (C-3) @ @ CONNECTION GAS: CURRENT
BUTANE (C-4) @ @ CURRENT AVG BACKGROUND
PENTANE (C-5) @ @
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY ACTIVITY
SUMMARY
Trip in hole to 10170', circulate gas out through choke, shut in well and monitor casing pressure, open well and circulate bottoms up, wash
and ream from 10169' to 10390' taking 15Klbs WOB, work free and circulate, trip out of hole to 10136' and circulate, wash and ream from
10166' to 10634' at report time. Max gas last 24 hours 2347 units.
CANRIG
PERSONNEL ON
BOARD:
n test joint and fill stack with waStrawn, Hillegeist, Grundin, Hudginster,
rig up to test blind rams, do draw down test on accumulator, pull test plug
and install wear bushing, blow down choke manifold and line up for hard
shut in, service rig, making up BHA at report time. Max gas last 2
__DAILY
COST: $3460.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
8/28/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson RiverField DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 28, 2013 DEPTH 11397' PRESENT OPERATION: Washing andReaming
TIME: 23:59 hrs YESTERDAY 11397'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.12 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
7 6" MX-18HDX 5217177 3x14/0.4510 11400' In Hole 0' 0
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION @ @ FT/HR
SURFACE TORQUE @ @ FT-LBS
WEIGHT ON BIT @ @ KLBS
ROTARY RPM @ @ RPM
PUMP PRESSURE @ @ PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400'
MW 8.9 VIS 59 PV 13 YP 16 Gels 5/7/8 FL 5.9 FC 1/2
SOL 1.5 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.5 ALK 0.70 Cl- 30,000 Ca+ 80
MWD SUMMARY
INTERVAL TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS @ @ TRIP GAS 1463u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ CONNECTION GAS HIGH
ETHANE (C-2) @ @ CONNECTION GAS: AVG
PROPANE (C-3) @ @ CONNECTION GAS: CURRENT
BUTANE (C-4) @ @ CURRENT AVG BACKGROUND
PENTANE (C-5) @ @
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY
ACTIVITY
SUMMARY
Wash and ream to 10768’, lost returns @ 10768’, build 75BBL 100lb/BBL LCM pill, drop ball to open well commander and second ball to isolate
BHA, pump 75 BBL LCM pill, back ream from 10730’ to 10700’ and pull out of hole to 9820’, service top drive and draw works, set on pill and
monitor well with trip tank (5 BBL/hr average loss), establish circulation through well commander and drop ball to close well commander, circulate
through bit to confirm circulation, drop ball to open well commander, trip in hole from 9820’ to 10373’, tagged bridge or ledge @ 10373’, circulate
ream pump sweep and wash on top of trouble spot, wash and ream from 10373’ to 10650’ at report time. Max gas last 24 hours 1463 units @
10630’.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
8/29/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson RiverField DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 29, 2013 DEPTH 11397' PRESENT OPERATION: Monitoring Well
TIME: 23:59 hrs YESTERDAY 11397'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.12 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
7 6" MX-18HDX 5217177 3x14/0.4510 11400' In Hole 0' 0
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION @ @ FT/HR
SURFACE TORQUE @ @ FT-LBS
WEIGHT ON BIT @ @ KLBS
ROTARY RPM @ @ RPM
PUMP PRESSURE @ @ PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400'
MW 8.9 VIS 59 PV 13 YP 16 Gels 5/7/8 FL 5.9 FC 1/2
SOL 1.5 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.5 ALK 0.70 Cl- 30,000 Ca+ 80
MWD SUMMARY
INTERVAL TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS @ @ 67u TRIP GAS 169u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ 1492.047 CONNECTION GAS HIGH
ETHANE (C-2) @ @ 43.108 CONNECTION GAS: AVG
PROPANE (C-3) @ @ 808.874 CONNECTION GAS: CURRENT
BUTANE (C-4) @ @ 1169.696 CURRENT AVG BACKGROUND 67u
PENTANE (C-5) @ @ 460.416
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY
ACTIVITY
SUMMARY
Wash and ream from 10630’ to 10690’, lost circulation @ 10690’ condition mud and build 75 lb/BBL LCM pill drop ball to close well commander
and isolate BHA, pump LCM pill, Pull up from 10703’ to inside shoe @ 9768’, condition mud and circulate to keep hole full, monitor well and open
well commander, work pipe @ 9815’ and try to unplug well commander, service rig and top drive, fill and monitor well for 1 hour and refill annulus
with 147 BBL, build LCM pill and pump down back side, pull out of hole from 9815’ to 9489’ dry, pump down drill pipe and establish circulation
through well commander, fill hole and monitor well at rotary table, trip in hole from 9489’ to 10383’, condition mud and circulate, break circulation
while filling backside, pump 70 BBL LCM slug, pull 19 stands and let LCM soak, cut and slip drill line, condition mud and circulate to clear LCM
from string and close well commander, monitoring well at 9470’ at report time. Max gas last 24 hours 169 units @ 10690’.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
8/30/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson RiverField DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson
DATE: Aug 30, 2013 DEPTH 11397' PRESENT OPERATION: Tripping In Hole
TIME: 23:59 hrs YESTERDAY 11397'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.12 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
7 6" MX-18HDX 5217177 3x14/0.4510 11400' In Hole 0' 0
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION @ @ FT/HR
SURFACE TORQUE @ @ FT-LBS
WEIGHT ON BIT @ @ KLBS
ROTARY RPM @ @ RPM
PUMP PRESSURE @ @ PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400'
MW 8.9 VIS 59 PV 14 YP 16 Gels 6/7/8 FL 6.8 FC 1/2
SOL 1.4 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.8 ALK 0.70 Cl- 30,500 Ca+ 48
MWD SUMMARY
INTERVAL TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS @ @ 45u TRIP GAS 169u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ 1490.9245 CONNECTION GAS HIGH
ETHANE (C-2) @ @ 62.0416 CONNECTION GAS: AVG
PROPANE (C-3) @ @ 581.3382 CONNECTION GAS: CURRENT
BUTANE (C-4) @ @ 694.5375 CURRENT AVG BACKGROUND 45u/15u
PENTANE (C-5) @ @ 230.7304
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY
ACTIVITY
SUMMARY
Monitor well @9470’, rig up test pump to shear well commander closing sleeve and pressured up to 4850 psi, rig down test pump, pull out of
hole from 9380’ to 96’, lay down directional tools (directional tools packed off with LCM and cuttings, change bit service rig make up pick up
and test MWD and directional tools, trip in hole to 6960’, service rig and continue to trip in hole to 8823’ at report time. Max gas last 24 hours
75 units @ 9470’.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
8/31/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ...
Hilcorp Alaska, LLC
Swanson RiverField DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson, Yessak
DATE: Aug 31, 2013 DEPTH 11397' PRESENT OPERATION: Pulling Out of Hole
TIME: 23:59 hrs YESTERDAY 11397'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.12 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
7 6" MX-18HDX 5217177 3x14/0.4510 11400' 11400' 0' 0
3RR2 6" Hughes STX-1 5224897 3x20/0.9204 11400' In Hole 0' 0
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION @ @ FT/HR
SURFACE TORQUE @ @ FT-LBS
WEIGHT ON BIT @ @ KLBS
ROTARY RPM @ @ RPM
PUMP PRESSURE @ @ PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400'
MW 8.4 VIS 27 PV - YP - Gels -/-/- FL - FC -
SOL - NAF/W - SD - MBT - pH 7.2 ALK - Cl- - Ca+ -
MWD SUMMARY
INTERVAL TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS @ @ 45u TRIP GAS 521u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ 1490.9245 CONNECTION GAS HIGH
ETHANE (C-2) @ @ 62.0416 CONNECTION GAS: AVG
PROPANE (C-3) @ @ 581.3382 CONNECTION GAS: CURRENT
BUTANE (C-4) @ @ 694.5375 CURRENT AVG BACKGROUND 45u/0u
PENTANE (C-5) @ @ 230.7304
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY
ACTIVITY
SUMMARY
Trip in hole from 8823’ to 9449’, change pop off valve on pump #2, run in hole from 9449’ to 10268’, service rig, run in hole to 10328’ and
started taking weight, wash and ream from 10328’ to 10610’, pump sweeps and circulate until hole is clean, pump 45 BBL pill and displace out
of pipe, pull out of hole from 10610’ to 9792’, check flow, pull out of hole from 9792’ to 2578’ at report time. Max gas last 24 hours 521 units @
10006’.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
9/1/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ...
Hilcorp Alaska, LLC
Swanson RiverField DAILY WELLSITE REPORT
SCU 12B-09
REPORT FOR: Grubb, Greco, Pederson, Yessak
DATE: Sep 1, 2013 DEPTH 11397' PRESENT OPERATION: Tripping in Hole
TIME: 23:59 hrs YESTERDAY 11397'
24 HOUR FOOTAGE 0'
CASING INFORMATION 7" @ 9849'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
10914' 78.12 325.76 10433.18'
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED
3RR2 6" Hughes STX-1 5224897 3x20/0.9204 11400' In Hole 0' 0
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION @ @ FT/HR
SURFACE TORQUE @ @ FT-LBS
WEIGHT ON BIT @ @ KLBS
ROTARY RPM @ @ RPM
PUMP PRESSURE @ @ PSI
DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400'
MW 8.4 VIS 32 PV 3 YP 5 Gels -/-/- FL - FC -
SOL - NAF/W - SD - MBT - pH 6.9 ALK - Cl- - Ca+ -
MWD SUMMARY
INTERVAL TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS @ @ 28u TRIP GAS 53u
CUTTING GAS @ @ WIPER GAS
CHROMATOGRAPHY (ppm) SURVEY
METHANE (C-1) @ @ 799.9066 CONNECTION GAS HIGH
ETHANE (C-2) @ @ 79.1157 CONNECTION GAS: AVG
PROPANE (C-3) @ @ 131.5928 CONNECTION GAS: CURRENT
BUTANE (C-4) @ @ 136.8698 CURRENT AVG BACKGROUND 28u/0u
PENTANE (C-5) @ @ 145.7793
HYDROCARBON SHOWS
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale
PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD.
DAILY ACTIVITY
SUMMARY
Pull out of hole from 2578’ to surface and lay down BHA, check upper pipe rams remove wear bushing and test lower pipe rams, install wear
bushing, rig up casing equipment, pick up shoe track make up packers and trip in hole with casing to 967’, make up liner hanger with wiper
rubber attached, rig down casing tools trip in hole 1000’ to 9122’ at report time. Max gas last 24 hours 53 units @ 9122’.
CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00
REPORT BY: Mike Strawn
Page 1 of 1Daily Report
9/2/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ...