Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-062 21 3062 Seth Nolan Hilcorp Alaska, L 2 8 7 8 GeoTech 3800 Centerpoint Drive, Suite 100 Anchorage, AK 99503 RECEIVED Tele: 907 777-8308 fGlmrh al,tskn.LTA, Fax: 907 777-8510 E-mail: snolan@hilcorp.com NOV 1 3 2017 DATE 11/10/17 AOGCC DATA LOGGED 1t/14/2011 Vl K BENDER To: Alaska Oil & Gas Conservation Commission Makana Bender Natural Resource Technician II 333 W 7th Ave Ste 100 Anchorage, AK 99501 DATA TRANSMITTAL SCU 12B-09 scoNED FEB 0 12018 Perforation record prints and digital data Prints: Perforation Record Log CD1: Elog digital data j SCU_12B-09 PERF_15SEPT17 LAS.zip 10/20/2017 9:15 AM Compressed(zippe... 119 KB 1- SCU_12B-09 PERF_15SEPT17.pdf 10/4/2017 3:26 PM Adobe Acrobat Doc... 546 KB SCU_12B-09 PERF_15SEPT17 img.tif 10/20/2017 9:14 AM TIF File 3,970 KB Please include current contact information if different from above. Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8337 Received By: Date: KECEIVED STATE OF ALASKA ALA.OIL AND GAS CONSERVATION COMM ON OCT 1 1 2011 • REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Plug Perforations U Fracture Stimulate U Pull Tubing U AQeGoOCdown U Performed: Suspend ❑ Perforate ❑✓ Other Stimulate ❑ Alter Casing El Change Approved Program ❑ Plug for Redrill El srforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2;Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: Hilcorp Alaska,LLC Development Q Exploratory ❑ 213-062 3.Address: 3800 Centerpoint Dr,Suite 1400 Anchorage, Stratigraphic Service ❑ 6.API Number: AK 99503 50-13-10126-02 7.Property Designation(Lease Number): 8.Well Name and Number: A028997 Soldotna Creek Unit(SCU)12B-09 9.Logs(Listlogs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A Swanson River Field/Hemlock Oil 11.Present Well Condition Summary: Total Depth measured 11,412 feet Plugs measured 10,433 feet true vertical 10,535 feet Junk measured N/A feet Effective Depth measured 10,433 feet Packer measured 9,491 feet true vertical 10,274 feet true vertical 9,484 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 32' 20" 32' 32' Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi Production Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi Perforation depth Measured depth See Attached Schematic True Vertical depth See Attached Schematic Tubing(size,grade,measured and true vertical depth) 3-1/2" 9.3#/L-80 9,567'MD 9,560'TVD DHL Hydraulic Pkr 9,491'MD 9,484'TVD Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A SCANNED :LAN 1 2 2.0 Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 5 3 2 595 200 Subsequent to operation: 81 21 5 720 150 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ❑i Exploratory❑ Development❑✓ Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas 0 WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 317-426 Authorized Name: Chad Helgeson 777-8405 Contact Name: Ted Kramer Authorized Title: �Ope�rations Manager Contact Email: tkramerehilcorp.com Authorized Signature: � !"L�i� /-' Date: I dif o 1) 7 Contact Phone: 777-8420 Form 10-404 Revised 4/2017 Submit Original Only ,a «�s-.7 RBDITS V/ but 1 2 2017 • • Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date SCU 12B-09 E-Line 50-133-10126-02 213-062 9/14/17 9/15/17 Daily Operations: 09/14/2017 -Thursday Arrive at PWL shop pickup crew and tools drive to Swanson River. Permit to work. Hold JSA and discuss job procedure. Rig up. PT lubricator and WLV 250/2500 psi. Shut in flow line. RIH/w 2.75" Gauge ring to 740' KB. Work tools to 765' KB not falling. Potential paraffin in hole. POOH. At surface.Tools covered in paraffin. RIH/w 3" slickline scratchers to 765' KB work tools to 975' KB stopped making hole. POOH. Seen over pull while Tripping out. Lay down Lubricator. Wire was blown up the hole. Wire wrapped from rope socket to slickline scratcher on Bottom. Cut line and tie new rope socket add 5' of stem. RIH/w 3" slickline scratcher to 975' KB work tools to 1060' KB diesel arrived on location. Start pumping diesel with field triplex pump. Fall through at 1198' KB continue to 2500' KB did not see any more paraffin. POOH to surface. RIH/w 2.75" Gauge ring to 754' KB work tools to 778' KB. POOH. RIH/w 3.5" paraffin cutter to 752' KB work tools to 1228' KB while pumping diesel with field triplex. Cut paraffin to 1472' KB. See light pockets at 1756' KB, 2148' KB, and 2457' KB continue to 2500' KB. POOH to 800' make 3 passes to 2500' KB. POOH. Break out 5' of stem. Make up 2.5"x20' dummy guns. RIH with dummy guns to 10,384' KB set down. POOH.Tagged up at surface. Close master and swab valve. Rig down SL unit and park equipment at P&S yard. Close out work permit. Location secure. Pollard crews off location. Night production operator shut in well to build pressure to 800 psi. Pumped 150 gallons of diesel for paraffin cutting. 09/15/2017 - Friday HES crew arrive at office. Permit to work. Hold safety meeting. Discuss job procedure. HES spot in equipment. SITP from previous night was 769 psi. Stab on well to PT lubricator 250/3000 psi for 10 minutes. Bleed down pop off well. BHA, RS, Gamma/CCL, firing head, 2.5"x10' HC charges, 6 spf. Halliburton engineer having troubles with communication between BHA and acquisition software. Problem was thought to be fixed. RIH @ 9000' lost acquisition with Gamma/CCL again. Called shop to get another set of tools dispatched. POOH to surface. Wait for new Gamma/CCI to arrive. NOTE: HES did not have 20' carriers. Have to use 2x 10' guns. New Gamma/CCL on location. Make up 1st gun run. 2.5"x10' HC connex loaded 6 spf. Stab on well. RIH log strip from 10,235' to 10,100'. Did 3 repeats. Hard to see good signature between logs. Send 3x log passes to town. Used tie in log from Geologist titled 12B-09 Tie in Log. Log confirmed on depth.Top Shot to CCL 10.7'. PU to 10,169.3' Shoot 10,180'-10,190' Current WHP prior to shooting 769 psi on crystal gauge. 25 minutes after shots fired WHP 829 psi and slowly rising. POOH. At surface. Close swab. Pop off well. All shots confirmed fired. Break down spent gun. Make up 2nd gun run. 2.5"x10' HC connex, 6spf. Stab on well. RIH. Log strip from 10,235'-10,100'. Send correlation log to town. Confirmed on depth by Geologist. Parked at 10,159.3 ccl depth. CCL to top shot 10.7' Puts top shot at 10,170'-10,180' WHP prior to shooting. 848 psi. Fire guns. POOH. 15 minutes pressure slowly climbed from 848 psi to 857 psi. At surface. Close swab valve. SITP 887. Contacted car 13 pad operator.Turned over well to production to start flowing. Soldotna Creek Unit • . • Well: SCU 12B-09 ini SCHEMATIC Completion Ran:9/12/13 PTD:213-062 Hikorp Alaska,LLC API: 50-133-10126-02 Ground Elev: 120'Above MSL KB-THF:19.0'/KB-GL:18.6' 1L CASING DETAIL 22" 2 Size Type Wt Grade Conn. ID Top Btm 20" Conductor - - - Surf 32' 11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009' 29 N-80 BTC 6.184" Surf 288' 26 N-80 _ BTC 6.276" 288' 1,048' 11-3/4"h7"7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715' 3 '` I 26 N-80 BTC 6.276" 4,715' 6,543' A 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830' 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600' .; 4 ' 1 TUBING DETAIL 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567' ill DV Collar @ 6,796' JEWELRY DETAIL No. Depth ID OD Item 1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box 6 VD i 2 20' 2.992" 4.470" XO,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin 3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1 7 )111 4 4,996' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#2 5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3 ii 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4 oi 7 8,844' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#5 8 9,395' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD Orifice#6 1 8 9 9,442' 2.992" 5.313" Chemical Injection Mandrel 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release) 9k 11 9,534' 2.813" 4.500" X-Nipple .$ A 12 9,567' 2.992" 4.470" WL Entry Guide I L I: I 11 13 10,433' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement 04/13/15 10 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 11 X' I 12 . �, Top of Liner i �� Hanger @ 9,606' Window @ fe ,, 9,830' PERFORATION DETAIL °" Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments Date 1 V G1 10,170' 10,190' 10,132' 10,146' 6 20 60 Proposed 9/15/17 91 10,222' 10,242' 10,167' 10,181' 6 20 60 Open 2/24/16 "E / G- i G-2 G2 10,283' 10,300' 10,205' 10,215' 6 17 60 Open 2/24/16 H-1 10,308' 10,360' 10,219' 10,243' 6 52 60 Open 2/23/16 rye$ H-1 10,374' 10,390' 10,249' 10,256' 6 16 60 Open 4/14/15 13 INN kg! H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated 9/15/13 H-2 H-2 ti:L:ti:1.ti:tii { r.r•r.r•r. 9e�`ti.ti.ti•ti.ti.ti $119ARRin Ta8 @ 10,494'RKBM 4-11/4 r:ti:rtirr 2.25"bailer 12/20/14 srr.y{{2.3: 15 {3 ::.::Z . ;:••.:::.:::.:4:::.:. Shoe @ 10,600' openhole ' 6"hole PBTD=10,433'MD/10,274'TVD TD=11,412'MD/10,535'TVD Max Deviation 78°@ 10,914' Max Dogleg 16.7°/100'@ 10,053' Downhole Revised:12/20/14 Updated by DMA 10-04-17 • • L OF T� � I%y � THE STATE Alaska Oil and Gas +� ►�t M ®fLAsKA Conservation Commission 333 West Seventh Avenue �"t" ' GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ALAS ' Fax: 907.276.7542 www.aogcc.alaska.gov Chad Helgeson SCANNED SEP 1 i 2017, Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Swanson River Field, Hemlock Oil Pool, SCU 12B-09 Permit to Drill Number: 213-062 Sundry Number: 317-426 Dear Mr. Helgeson: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, 41(-41 Cathy P. oerster Commissioner DATED this G day of September, 2017. RBDMS VSEP - 7 2017 • RECEIVED STATE OF ALASKA EP 52 17,. ALASKA OIL AND GAS CONSERVATION COMMISSION l APPLICATION FOR SUNDRY APPROVALS A l 20 MC 25.280 1.Type of Request: Abandon ❑ Plug Perforations❑ Fracture Stimulate 0 Repair Well 0 Operations shutdown 0 Suspend ❑ Perforate Q • Other Stimulate ❑ Pull Tubing ❑ Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: Hilcorp Alaska,LLC Exploratory 0 Development Q 213-062 ' 3.Address: 3800 Centerpoint Dr,Suite 1400 Stratigraphic 0 Service ❑ 6.API Number: Anchorage Alaska 99503 50-133-10126-02-00 ' 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? CO 123B Soldotna Creek Unit(SCU)12B-09• Will planned perforations require a spacing exception? Yes ❑ No 0 9.Property Designation(Lease Number): 10.Field/Pool(s): A028997 ' Swanson River Field/Hemlock Oil • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 11,412' • 10,535' 10,570' 10,331' 3,380 N/A N/A Casing Length Size MD TVD Burst Collapse Structural Conductor 32' 20" 32' 32' Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi Production Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attached Schematic See Attached Schematic 3-1/2" 9.3#,L-80 9,567' Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): DLH Hydraulic Packer;N/A 9,491'MD/9,484'TVD;N/A 12.Attachments: Proposal Summary Q Wellbore schematic Q 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch 0 Exploratory ❑ Stratigraphic❑ Development Q Service ❑ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: September 19,2017 OIL Q WINJ 0 WDSPL ❑ Suspended 0 16.Verbal Approval: Date: GAS ❑ WAG 0 GSTOR ❑ SPLUG ❑ Commission Representative: GINJ 0 Op Shutdown ❑ Abandoned 0 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Chad Helgeson 777-8405 Contact Name: Ted Kramer Authorized Title: Operations Manager Contact Email: tkramer(a7hilcorp.com / Contact Phone: 777-8420 Authorized Signature: Date: ,M7 /i7 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 317- 424p Plug Integrity 0 BOP Test 0 Mechanical Integrity Test ❑ Location Clearance 0 Other: Post Initial Injection MIT Req'd? Yes ❑ No i DBDNIS (;7'SEP ` 1 �tt7 Spacing Exception Required? Yes ❑ NoSubsequent Form Required: i t'—y C714- /� APPROVED BY 13.•-‘ / Approved by� ��" �� COMMISSIONER THE COMMISSION Date: 7 –4 –7 7 111/t`�� 1 ® Rril,GclaNcAtvalid al. j 5 i7 ubmd Form andForm 10-403 Revised 412017 for 12 months from the dat ' f approval. Attachments in Duslic�tm7 • • Well Prognosis Well: SCU 12B-09 Ililcorp Alaska,LL Date:9/5/2017 Well Name: SCU 12B-09 API Number: 50-133-10126-02 Current Status: Gaslifted Oil Well Leg: N/A Estimated Start Date: September 19th, 2017 Rig: E-line - Reg.Approval Req'd? 403 Date Reg.Approval Rec'vd: Regulatory Contact: Donna Ambruz 777-8305 Permit to Drill Number: 213-062 First Call Engineer: Ted Kramer (907) 777-8420(0) (985)867-0665 (M) Second Call Engineer: Chad Helgeson (907) 777-8405 (0) (907) 229-4824(M) AFE Number: Current Bottom Hole Pressure: — 1,690 psi @ 10,234' TVD (Based on Survey taken on 2/1/2016.) Max. Potential Surface Pressure: - 3,380 psi @ 10,152' TVD (Based on 0.433 psi/ft gradient to TVD, and gas gradient to surface of 0.1 psi/ft) Brief Well Summary Soldotna Creek Unit 12B-09 was drilled as a sidetrack of SCU 23A-09 and the liner was run in September 2013. A gaslift completion was ran in September 2013 with perforations in the Hemlock H-2 bench added thru tubing. April 2015 the reservoir was depleted sufficiently.April 2015,the H-2 was isolated with a thru-tubing plug and the H-1 was perforated. In 2016 additional perfs were added in the H1 and the Tyonek G sand was perforated. Objective: Add new perforations in the Tyonek G-1 zone and increase the oil rate. Pre-Sundry work to be completed: - Slickline drift and tag with 2.75"gauge ring to bottom, Brush &flush as needed to get down the well. - Bail fill with slickline if necessary to clean proposed perf interval. E-line Procedure: 1. MIRU E-line, PT lubricator to 3,000 psi Hi 250 Low for 10 min. 2. RU 2.5" 6 spf HC wireline guns(6—spf shot density). 3. RIH and perforate the following intervals: Zone Sands Top (MD) Btm (MD) FT Tyonek G1 ±10,164' ±10,198' 34 a. Proposed perfs shown on the proposed schematic in red font. b. Final Perfs tie-in sheet will be provided in the field for exact perf intervals. c. Pressure up or bleed tubing pressure as needed per Engineer's instructions with gas lift prior to perforating. d. Correlate using correlation log. Use Gamma/CCL/to correlate. e. Install Crystal gauges before perforating. Record tubing pressures before and after each perforating run. f. All perforations in table above are located in the Hemlock Oil Pool based Order No. 123A. 4. RD E-line. 5. Turn well over to production. • • Well Prognosis Well: SCU 12B-09 Hilcurp Alaska,LL) Date:9/5/2017 Attachments: 1. Current Schematic 2. Proposed Schematic 11 • • Soldotna Creek Unit Well: SCU 12B-09 SCHEMATIC Completion Ran:9/12/13 PTD:213-062 Hil vrp Alaska,LLC API: 50-133-10126-02 Ground Elev: 120'Above MSL KB-THF: 19.0'/KB-GL:18.6' 1 22" 2CASING DETAIL Size Type Wt Grade Conn. ID Top Btm 20" Conductor - - - Surf 32' 11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009' 29 N-80 BTC 6.184" Surf 288' 26 N-80 BTC 6.276" 288' 1,048' Li. G 11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715' 3 26 N-80 BTC 6.276" 4,715' 6,543' r 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830' •e 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600' 4 I TUBING DETAIL r' 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567' DV Collar @ 6,796' , 5 AB 'ii :� JEWELRY DETAIL No. Depth ID OD Item 1 19' 2.992" Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box k 6 NIB 1 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin « 3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1 . 4 4,996' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#2 5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3 ., 7 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4 r 7 8,844' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#5 8 9,395' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD Orifice#6 8 9 9,442' 2.992" 5.313" Chemical Injection Mandrel 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release) 9 11 9,534' 2.813" 4.500" X-Nipple it 12 9,567' 2.992" 4.470" WL Entry Guide _ l I, l 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement 10 r - 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 110 11 X 12 Top of Liner i ' Hanger @ 9,606' 7 1: ;r10 "� Window @ 9,830' Tag fill @ 10,368' k 'f PERFORATION DETAIL w/E-line on ; Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments Date 2/23/16 4 G-2 10,222' 10,242' 10,167' 10,181' 6 20 60 Open 2/24/16 r I( H-1 G2 10,283' • 10,300' 10,205' 10,215' 6 17 60 Open 2/24/16 k n+' " 10,308' • 10,360' 10,219' 10,243' 6 52 60 Open 2/23/16 ti.tixzr`y•4 c 13 0 t.)" H-1 10,374' • 10,390' 10,249' 10,256' 6 16 60 Open 4/14/15 H-2 H-2 10,448' • 10,494' 10,280' 10,300' 6 46 60 Isolated 9/15/13 I. 1.1.1.1.1• •r•r•r•r•r•' 5.1.1.1.1. •r•r•r•r•r• 1.1.1.1.1• .4 r•r•r•r•r• 4.1.1.1.1• Ta 10,494'RKBM 4r•r.r•r•r• g @ .1.1.1.1• r•r•r•r•r• 14 4.1.1.1.1. 2.25"bailer 12/20/14 4?4•{4?4?4? • 14515151f15• ' Fl 15 1:1:1:4 :' 4x4x4x4x4x 4-1/2" *4,L.4' ,'L Shoe @ 10,600' openhole ,, 'c .,�� ..,, . ,` 6"hole PBTD=10,570'MD/10,331'ND TD=11,412'MD/10,535'ND Max Deviation 78°@ 10,914' Max Dogleg 16.7°/100'@ 10,053' Downhole Revised:12/20/14 Updated by DMA 03/23/16 111 0 II PROPOSED SCHEMATIC Soldotna Creek Unit Well: SCU 12B-09 Completion Ran:9'12/13 PTD:213-062 Hikor"Alaska.L1,c API: 50-133-10126-02 Ground Elev:120'Above MSL KB-THF:19.0'/KB-GL:18.6' 22" J 2 2 —+ CASING DETAIL ____;i [LSize Type Wt Grade Conn. ID Top Btm 20" Conductor - - - Surf 32' 11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009' 29 N-80 BTC 6.184" Surf 288' 26 N-80 BTC 6.276" 288' 1,048' 11-3/4"G' 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715' 3 26 N-80 BTC 6.276" 4,715' 6,543' 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830' 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600' 4I TUBING DETAIL 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567' ' DV Collar @ 6,796' 51 JEWELRY DETAIL No. Depth ID OD Item 1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box 1>I, 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin e 3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1 4 4,996' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#2 5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3 71-131 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4 7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5 8 9,395' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD Orifice#6 81 9 9,442' 2.992" 5.313" Chemical Injection Mandrel 11) 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release) 9 I p 11 9,534' 2.813" 4.500" X-Nipple A12 9,567' 2.992" 4.470" WL Entry Guide 10 31 I 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement 14 10,527' 4.000' 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 11 12 - Top of Liner r mit Hanger @ 9,606' 7Fr 1 ' I' a Window @ 9,830' t PERFORATION DETAIL 14 Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments Date G-1 G1 ±10,164' ±10,198' ±10,128 ±10,152 6 34 60 Proposed Future 41, r G-2 10,222' 10,242' 10,167' 10,181' 6 20 60 Open 2/24/16 H-1 G2 10,283' 10,300' 10,205' 10,215' 6 17 60 Open 2/24/16 13 10,308' 10,360' 10,219' 10,243' 6 52 60 Open 2/23/16 1 ' H-1 10,374' 10,390' 10,249' 10,256' 6 16 60 Open 4/14/15 H-2 .4,1r:4:1r~r H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated 9/15/13 '1.147,1,•fL;:11. •11:::::,,V...; @ r , • Tag 10,494'RKBM .•tiL:titiftiti: 14 tiCti.1::r;: 2.25"bailer 12/20/14 3` L 1 IP B tiff ti•ti•i� �'. .ftilylyf 15 4,74.165".1,7=7; , .."–'7:72* a `` Shoe @ 10,600' i ` , 4 openhole " 3 6"hole PBTD=10,570'MD/10,331'ND TD=11,412'MD/10,535'ND Max Deviation 78°@ 10,914' Max Dogleg 16.7°/100'@ 10,053' Downhole Revised:12/20/14 Updated by CAH 9/5/17 • • 21 3062 Seth Nolan Hilcorp Alaska, LLC 1 7 1 dl 7 GeoTech 3800 Centerpoint Drive, Suite 100 7 Anchorage, AK 99503 Tele: 907 777-8308 DATA LOGGED Ifilvurp:Unrka.i.iA Fax: 907 777-8510 2oif, E-mail: snolan@hilcorp.com M.K.BENDER DATE 05/17/16 To: Alaska Oil & Gas Conservation Commission Makana Bender Natural Resource Technician II 333 W 7th Ave Ste 100 RECEIVED Anchorage, AK 99501 . iv;,4Y 2 0 2016 DATA TRANSMITTAL �"° AOGCC SCU 12B-09 . 1, Perforation record prints and digital data Prints: Perforation Record Log CD1: Elog digital data SCU_12B-09_PERF_23FEB16.pdf 3/25/2016 3:02 PM PDF Document 3,438 KB SCU_12B-09_PER.F_23FEB16_CORRELATIO... 3/25/20163:22 PM LAS File 2,340 KB SCU 12B-09 PERF 23FEB16 CORRELATIO... 3,/25/20163:22 PM LAS File 568 KB SCU 12B-09 PERF 23FEB16 CORRELATIO... 3/25/2016 3:22 PM LAS File 628 KB SCU 12B-09 PERF 23FEB16 CORRELATIO,.. 3/25/2016 3:22 PM LAS File 752 KB SCU 12B-09 PERF 23FEB16 CORRELATIO,.. 3/25/2016 3:22 PM LAS File 693 KB SCU_12B-09_PERF_23FEB16_CORRELATIO,.. 3/25/2016 3:22 PM LAS File 78 KB SCU 128-09 PERF 23FEB16 img.tiff 3/25/20163:02 PM TIFF File 4,126 KB SCU_12B-09_PERF_23FEB16_Perf Pass Gu... 3/25/2016 3:02 PM LAS File 30 KB SCU 12B-09 PERF 23FEB16 Perf Pass Gu... 3/25/20163:02 PM LAS File 66 KB SCU 12B-09 PERF 23FEB16 Perf Pass Gu... 3/25/20163:02 PM LAS File 38 KB SCU 12B-09 PERF 23FEB16 Perf Pass.Gu... 3/25/2016 3:02 PM LAS File 66 KB SCU 12B-09 PERF 23FEB16 Perf Pass Gu... 3/25/2016 3:02 PM LAS File 86 KB Please include current contact information if different from above. Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8337 Received ✓� O- 4 Date: V €4 Seth Nolan Hilcorp Alaska, LLC Li 0 b II GeoTech 3800 Centerpoint Drive RECEIVic Anchorage, AK 99503 Tele: 907 777-8308 Ifilrnrp tlirka.1.11. �" Fax 907 777-8510 APR 0 8 2016 E-mail: snolan@hilcorp.com DATA LOGGED DATE 04/05/16 AOGCC41,,3/2010. ;a K. BENDER To: Alaska Oil & Gas Conservation Commission Makana Bender 333 W 7th Ave Ste 100 Anchorage, AK 99501 DATA TRANSMITTAL SCU 12B-09 CIkosE APlk-- 2" Perforation data Print: Perforation Record CD: digital version a SCU_126-L9_PERF_23FEB16 3/25/2016 3:02 PM PDF Document 3.438 KB .. SCU_12B-09_PERF_23FEB16_CORRELATIO,.. 3/'25,'2016 3:22 PM LAS File 2,340 KB SCU_12B-09_PER.F_23FEB16_CORRELATIO... 3/25/2016 3:22 PM LAS File 568 KB SCU_12B-09_PERF_23FEB16_CORRELATIO.,. 3/25/2016 3:22 PM LAS File 628 KB SCU 12B-09_PERF_23FEB16 CORRELATIO... 3/25?2016 3:22 PM LAS File 752 KB SCU_128-09_PERF_23FEB16_CORRELATIO... 3/25/2016 3:22 PM LAS File 693 KB SCU_12B-09_PERF_23FEB16_CORRELATIO,,. 3/25/2016 3:22 PM LAS File 78 KB i. SCU 12B-09 PERF 23FEB16 img 3/25/2016 3:02 PM TIFF File 4.126 KB _ SCU_12B-09_PERF 23FEB16_Perf Pass Gu... 3.x25/2016 3:02 PM LAS File 30 KB SCU 12B-09_PERF_23FEB16_Perf Pass Gu... 3/25/2016 3:02 PM LAS File 66 KB SCU_12B-09_PERF_23FEB16_Perf Pass Gu... 3/25/2016 3:02 PM LAS File 38 KB SCU_12B-09_PERF_23FEB16_Perf Pass Gu... 3/25x2016 3:02 PM LAS File 66 KB SCU_12B-09_PERF_23FEB16_Perf Pass Gu,,. 3/25/2016 3:02 PM LAS File 86 KB Please include current contact information if different from above. Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8337 Received eya/j� Date: ill E c./.) STATE OF ALASKA ALL OIL AND GAS CONSERVATION COM SION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing❑ Operations shutdown ❑ Performed: Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well❑ Other: Re-pert ❑., 2.Operator 4.Well Class Before Work: 5. Permit to Drill Number: Name: Hilcorp Alaska, LLC Development ❑✓ Exploratory ❑ 213-062 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,Alaska 99503 50-133-10126-02 7.Property Designation(Lease Number): 8.Well Name and Number: A028997 Soldotna Creek Unit(SCU) 12B-09 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Swanson River Field/Hemlock Oil 11. Present Well Condition Summary: Total Depth measured 11,412 feet Plugs measured N/A feet 'AR 2 4 2016 true vertical 10,535 feet Junk measured N/A feet ( �/'�[�{ Effective Depth measured 10,570 feet Packer measured 9,491 feet -�"lel�T true vertical 10,331 feet true vertical 9,484 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 32' 20" 32' 32' Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi Production Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi Perforation depth Measured depth See Attached Schematic APR 1 9 2.°V5 16 True Vertical depth See Attached Schematic 1,01/40 f Tubing(size,grade,measured and true vertical depth) 3-1/2" 9.3#/L-80 9,567'MD 9,560'TVD DHL Hydraulic Pkr 9,491'MD 9,484'TVD Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 11 7 5 600 175 Subsequent to operation: 27 8 7 560 160 14.Attachments(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Cl Exploratory❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil E Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 316-078 Contact Joe Kaiser Email lkaiser@hilcorp.com Printed Name Chad Helgeson Title Operations Manager Signature 1,:',/, Phone 907-777-8405 Date .'/71 /l C Form 10-404 Revised 5/2015 y s}LG RBDMS \A/ MAR 1 5 2016 Submit Original Only 4- 4/4/7 • • Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date SCU 12B-09 E-Line 50-133-10126-02 213-062 2/23/16 2/24/16 Daily Operations: 02/23/2016-Tuesday Mobe equipment to location. PTW and JSA. Spot equipment and rig up lubricator. Presssure test lub to 250 psi low and 2,000 psi high. RIH with CCL/GR and tie into Halliburton plug log dated 4-13-15 and tagged fill at 10,368'. Run correlation log and sent to Dan Taylor. Log was 1 foot high but we still could not reach the H1 perf. POOH to run G2 perf guns. TP 160 psi flow at 10 bpd. RIH w/2-1/2" x 20' Razor 6 spf, 60 deg phase and tied into Halliburton correlation log from last run. Ran correlation perf log#1 and sent to town. Got ok to perf from 10,340'to 10,360'. Spotted gun and fired with 160 psi on well flowing. Saw no change in pressure after 5 min. POOH. RIH w/2-1/2" x 20' Razor 6 spf, 60 deg phase and tied into Halliburton correlation log from last run. Ran correlation perf log#2 and sent to town. Got ok to perf from 10,320' to 10,340'. Spotted gun and fired with 160 psi on well flowing. Saw no change in pressure after 5 min. POOH. RIH w/2-1/2" x 12' Razor 6 spf, 60 deg phase and tied into Halliburton correlation log from last run. Ran correlation perf log#3 and sent to town. Got ok to perf from 10,308' to 10,320'. Spotted gun and fired with 160 psi on well flowing. Saw no change in pressure after 5 min. POOH. Rig for standy, will keep flowing well overnight and finish the 2 runs in the morning. 02/24/2016-Wednesday PTW and JSA and rig up lubricator. Pressure test lub to 250 psi low and 2,000 psi high. RIH w/2-1/2" x 17' Razor 6 spf, 60 deg phase and tied into Halliburton correlation log from last run. Ran correlation perf log#4 and sent to town. Got ok to perf from 10,283' to 10,300'. Spotted gun and fired with 160 psi on well flowing. Saw no change in pressure after 5 min. POOH. At 700' lost tool wt and gained it back after 50' to 60'. Acted like slug of fluid blow us up hole. It kinked 50' of line. Cut off 60' line and put new rope socket on line. RIH w/2-1/2" x 20' Razor 6 spf, 60 deg phase and tied into Halliburton correlation log from last run. Ran correlation perf log#5 and sent to town. Got ok to perf from 10,222' to 10,242'. Shut gas lift off. Spotted gun and fired with 300 psi on tubing and 400 psi on casing after equalizing. POOH. Rig down lubricator and turn well over to field. Soldotna Creek Unit n • • Well: SCU 12B-09 SCHEMATIC Completion Ran:9/12/13 PTD: 213 062 nihnrp:1la.ka.I'' API: 50-133-10126-02 Ground Elev: 120'Above MSL KB-THF: 19.0'/KB-GL: 18.6' 1 22" 2 CASING DETAIL Size Type Wt Grade Conn. ID Top Btm 20" Conductor Surf 32' 11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009' 29 N-80 BTC 6.184" Surf 288' 26 N-80 BTC 6.276" 288' 1,048' 11-3/�„G 7” Intermediate 23 N-80 BTC 6.366" 1,048' 4,715' 3 26 N-80 BTC 6.276" 4,715' 6,543' 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830' 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600' TUBING DETAIL 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567' I iiiiii ' DV Collar @ 6,796' 5) JEWELRY DETAIL No. Depth ID OD Item 1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box 6 li 2 20' 2.992" 4.470" XO,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin 3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1 4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2 5 6,802' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#3 7 6 8,000' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#4 7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5 8 9,395' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD Orifice#6 81 9 9,442' 2.992" 5.313" Chemical Injection Mandrel 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release) 9 11-11011 9,534' 2.813" 4.500" X-Nipple 12 9,567' 2.992" 4.470" WL Entry Guide Lai 3 i. 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement 10 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 11 X 12�] Top of Liner Hanger @ 9,606' 7 , Window @ 9,830' Tag fill @ 10,368' PERFORATION DETAIL w/E-line on Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments Date 2/23/16 G-z v10,222' 10,242' 10,167' 10,181' 6 20 60 Open 2/24/16 r,•%•%•%}}•'� H-1 G2 .40,283' 10,300' 10,205' 10,215' 6 17 60 Open 2/24/16 ✓L{y{L{:•:: 10,308' 10,360' 10,219' 10,243' 6 52 60 Open 2/23/16 13 H-1 10,374' 10,390' , 10,249' 10,256' 6 16 60 Open 4/14/15 H 2 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated 9/15/13 2r11111•F11. r•r•r•r•r r•r•r.r•r Tag10,494'RKBM .L.ti.ti•ti.ti.. 14 ,tirtirti�tirtir ..;;VS;d{{{:ill 2.25"bailer 12/20/14 .ti'.4'•tif{{{{, ▪r•r•r•r•r 15 ,tirtirtirtirtir II ftirtirti. 4-1/2" 4 - _ \Shoe @ 10,600' openhole 6"hole PBTD=10,570'MD/10,331'TVD TD=11,412'MD/10,535'TVD Max Deviation 78°@ 10,914' Max Dogleg 16.7°/100'@ 10,053' Downhole Revised:12/20/14 Updated by DMA 03/23/16 • • L OF T8 . ,.,,,,�„,. THE STATE Alaska Oil and Gas �,',.e'�dsTli Of A T Q S KA Conservation Commission 333 West Seventh Avenue 14."V1111-\'T".•'' f GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 r h. -.�! Main: 907.279.1433 °FALAS*P' Fax: 907.276.7542 www.aogcc.alaska.gov Chad Helgeson Operations Manager C 44E t i�,l� ' 'U,ti Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Swanson River Field, Hemlock Oil Pool, SCU 12B-09 Permit to Drill Number: 213-062 Sundry Number: 316-078 Dear Mr. Helgeson: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, A14. /7/L, Cathy . Foerster ., Chair DATED this 1 i day of February, 2016. RBDMS Lk- FEB 1 9 2016 • 0 0 RECEIVED STATE OF ALASKA FEB 0 3 2016 • ALASKA OIL AND GAS CONSERVATION COMMISSION O .S' 2.4) tio APPLICATION FOR SUNDRY APPROVALS AOGC 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate 0 - Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: Re-pert ❑., 2.Operator Name: Hilcorp Alaska,LLC 4.Current Well Class: 5. Permit to Drill Number: Exploratory ❑ Development E. 213-062 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic ❑ Service ❑ 6.API Number. Anchorage,Alaska 99503 50-133-10126-02-00 ' 7. If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? CO 123B - Soldotna Creek Unit(SCU)12B-09 - Will planned perforations require a spacing exception? Yes ❑ No ❑., 9. Property Designation(Lease Number): 10. Field/Pool(s): A028997 • Swanson River Field/Hemlock Oil • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): 'Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 11,412' 10,535' • 10,570' 10,331' 1,400 psi N/A N/A Casing Length Size MD TVD Burst Collapse Structural Conductor 32' 20" 32' 32' Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi Production Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attached Schematic See Attached Schematic 3-1/2" 9.3#,L-80 9,567' Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): DLH Hydraulic Packer; N/A 9,491'MD/9,484'TVD; N/A 12.Attachments: Proposal Summary ❑✓ Wellbore schematic ❑✓ 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development R' Service ❑ 14.Estimated Date for 15.Well Status after proposed work: CommencingOperations: February 18,2016 OIL WINJ WDSPL p ❑ ' ❑ ❑ Suspended ❑ 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Joe Kaiser-777-8393 Email jkaiser@hilcorp.com Printed Name Chad Helgeson Title Operations Manager Signature 6/.7/74/ Phone 907-777-8405 Date z_/3/I tv COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number 31 (19 - 01$ Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial Injection MIT Req'd? Yes ❑ No ❑ L/ Spacing Exception Required? Yes ❑ No Subsequent Form Required: 0 C i RBDMS LA- FEB 1 9 2018 /��li / �',f/,Y— APPROVED BY Approved by: � -- COMMISSIONER( H C MMISSION Date:2 X / 17 6 Submit Form and Form 10403 Revised 11/2015 Approved application is va f r 2 months from the date of approval. Attachments in Duplicate 4/-4 . • Well Prognosis • Well: SCU 12B-09 IliIcorp Alaska,LL Date: 2/3/2016 Well Name: SCU 12B-09 API Number: 50-133-10126-02 Current Status: Gas Lifted Oil Well Leg: N/A Estimated Start Date: February 18`h, 2016 Rig: E-line Reg.Approval Req'd? 403 Date Reg.Approval Rec'vd: Regulatory Contact: Donna Ambruz 777-8305 Permit to Drill Number: 213-062 First Call Engineer: Joe Kaiser (907) 777-8393 (0) (907)952-8897 (M) Second Call Engineer: Chad Helgeson (907) 777-8405 (0) (907) 229-4824 (M) AFE Number: Current Bottom Hole Pressure: — 1,690 psi @ 10,234' TVD (Based on Survey taken on 2/1/2016.) Max. Potential Surface Pressure: — 1,400 psi (Based on gas lift pressure) Brief Well Summary Soldotna Creek Unit 12B-09 was drilled as a sidetrack of SCU 23A-09 and the liner was run in September 2013. A gaslift completion was run in September 2013 with perforations in the Hemlock H-2 bench added thru tubing. In April 2015 the H-2 reservoir was depleted sufficiently and was isolated with a thru-tubing plug and the H-1 was perforated. Plan forward is to add additional perforations in the H-1 Hemlock and new perforations in the Tyonek G-2 zone, Objective: Add perforations in the Hemlock H-1 bench and the Tyonek G-2 bench. Well Conditions: Using slickline, ensure tubing is clear of paraffin (2.75" minimum) and tag below 10,420'. Clean fill if necessary. E-line Procedure: 1. MIRU E-line, PT lubricator to 2,000 psi Hi/250 Low for 10 min. 2. RU 2.5" 6 spf HC wireline guns (6spf shot density). 3. RIH and perforate the following intervals: NOTE:Perforate H-1 sand first and test well for production impact prior to adding G-2 sand perforations. Rig down E-line during this production testing time. Zone Sand (Top) Btm(MD) (Top) Btm(TVD) SPF Status Tyonek G2 10,222' 10,360' 10,167' 10,242' 6 Proposed • Hemlock H1 10,390' 10,420' 10,255' 10,268' 6 Proposed a. Proposed perf interval shown on the proposed schematic. b. Final perfs tie-in sheet will be provided to the field for exact perf intervals. c. Correlate using Cement Bond Log (pending Tie-in log). d. Use Gamma/CCL to correlate. e. All perforations in table above are located in the Hemlock Pool based on Conservation - Order No. 1236 Rule 5. 4. RD E-line. 5. Turn well over to production. • • Well Prognosis • Well: SCU 12B-09 Ililcarp Alaska,LL Date:2/3/2016 Attachments: 1. Current Schematic 2. Proposed Schematic • • • Soldotna Creek Unit 11 Well: SCU 12B-09 • SCHEMATIC Completion Ran:9/12/13 PTD: 213-062 Ili!cora Alaska,IAA: API: 50-133-10126-02 Ground Elev:120'Above MSL KB-THF:19.0'/KB-GL:18.6' J CASING DETAIL 22"!J 2 Size Type Wt Grade Conn. ID Top Btm 20" Conductor - - - Surf 32' 11-3/4" Surf.Csg 47 J-55 8RD 11.00" Surf 2,009' 29 N-80 BTC 6.184" Surf 288' 26 N-80 BTC 6.276" 288' 1,048' 11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715' 3 il 26 N-80 BTC 6.276" 4,715' 6,543' "mayMt" 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830' 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600' 4 TUBING DETAIL °N a 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567' IDV Collar @ 6,796' ,.#, 5 I lo' JEWELRY DETAIL t tt No. Depth ID OD Item 'w8 1 19' 2.992" Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box 6 1 1 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin kAll 3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1 ° 4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2 5 6,802' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#3 7 P 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4 1,10 iii, r� 7 8,844' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#5 Til '7j 8 9,395' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD Orifice#6 8 i 0 9 9,442' 2.992" 5.313" Chemical Injection Mandrel 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release) 1. 9 11 9,534' 2.813" 4.500" X-Nipple .� NI 12 9,567' 2.992" 4.470" WL Entry Guide 10 w l . l l a. 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement 49 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell J 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 'd 11isi vi, 12 - Top of Liner y Hanger @ 9,606' 7„ r f Window @ 9,830' 'II PERFORATION DETAIL 0, Date Zone _ Top(MD) Btm(MD) _ Top(TVD) Btm(TVD) SPF Ft Phase Comments 4/14/15 H-1 _ 10,374' 10,390' _ 10,249' 10,256' 6 16 60 Open H4 9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated 13 ,. L L r. *N 't$'a a Tag @ 10,494'RKBM ,♦♦,2,y,,,., 2.25"bailer 12/20/14 **.,., 14 tirw ' 15 * <tk;; r: } 4-1/r :1 e a Shoe @ 10,600' "' row " openhole ,../,:, o.,„ y- * :,p 6"hole PBTD=10,570'MD/10,331'TVD TD=11,412'MD/10,535'ND Max Deviation 78°@ 10,914' Max Dogleg 16.7°/100'@ 10,053' Downhole Revised:12/20/14 Updated by DMA 05/11/15 !' Soldotna Creek Unit Well: SCU 12B-0 ' 8-09 PROPOSED SCHEMATIC Completion130629/12/13 PTD: HaOfl tl.LU.I.I.I API: 50-133-10126-02 Ground Elev:120'Above MSL KB-THF:19.0'/KB-GL:18.6' 1 CASING DETAIL 22" 2im. [L Size Type Wt Grade Conn. ID Top Btm 20" Conductor Surf 32' 11-3/4" Surf.Csg 47 1-55 8RD 11.00" Surf 2,009' 29 N-80 BTC 6.184" Surf 288' 26 N-80 BTC 6.276" 288' 1,048' 11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715' 3 IIK , 26 N-80 BTC 6.276" 4,715' 6,543' .i e29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830' 4 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600' 4 I TUBING DETAIL ;., st▪4 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567' DV Collar @ 6,796' • 5 1 I, JEWELRY DETAIL r ' No. Depth ID OD Item w,: VI 1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box 6 i 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin 3 2,752' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#1 te 4 4,996' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#2 5 6,802' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#3 't 7 L* 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4 ` 7 8,844' 2.992 5.250" 3-1/2"SFO-1 Mandrel 8RD#5 ;' ' 8 9,395' 222.,999999222,: ,; .992" 5.250 3-1/2"SFO 1 Mandrel 8RD Orifice#6 ' wK` 9 9,442' 2.992" 5.313" Chemical Injection Mandrel • 8 ,,'- 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release) ss s; 9 ,+ 11 9,534' 2.813" 4.500" X-Nipple ' 111 Yom± 12 9,567' 2.992" 4.470" WL Entry Guide ▪. ,x ,.: 13 10,443' 3.958" 2.75"Plug(ITS 4200-275-AC-001)w/10'cement 10 ' 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell fi 1 im 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell "• 11 f r44 t 12 ! r Top of Liner s` w..,.:*', Hanger @ 9,606' T.. �I 7" '4111 Window @ 9,830' tal . t,"' 'PERFORATION DETAIL 11 1 G-2 Date Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments G2 10,222' 10,360' 10,167' 10,242' 6 138 60 Proposed • y H-1 H-1 10,390' 10,420' 10,255' 10,268' 6 30 60 Proposed f .Ir" 4/14/15 H-1 10,374' 10,390' 10,249' 10,256' _ 6 16 60 Open 13 y 9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated „ H-2 :,°:,/A,,,.*,Li Tag @ 10,494'RKBM 14 .,°,�, 2.25"bailer 12/20/14 / '/ 15 `''r4i8r 4-1/2" .+ '4` Shoe @ 10,600' openhole .� . 1.",r i'r f 6"hole PBTD=10,570'MD/10,331'ND TD=11,412'MD/10,535'ND Max Deviation 78°@ 10,914' Max Dogleg 16.7°/100'@ 10,053' Downhole Revised:12/20/14 Updated by JEK 1/29/16 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Plug Perforations U Fracture Stimulate U Pull Tubing U Operations shutdown U Performed: Suspend ❑ Perforate El Other Stimulate El Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ srforate New Pool El Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: Hilcorp Alaska,LLC Development ❑ Exploratory ❑ 213-062 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,Alaska 99503 50-133-10126-02 7.Property Designation(Lease Number): 8.Well Name and Number: A028997 Soldotna Creek Unit(SCU)12B-09 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A Swanson River Field/Hemlock Oil 11.Present Well Condition Summary: Total Depth measured 11,412 feet Plugs measured N/A feet ' 'e^ true vertical 10,535 feet Junk measured N/A feet m/_ 1 1 201,1 Effective Depth measured 10,570 feet Packer measured 9,491 feet p� r ,�, GC true vertical 10,331 feet true vertical 9,484 feet R"11�J Casing Length Size MD ND Burst Collapse Structural Conductor 32' 20" 32' 32' Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi Intermediate 9,830' 7" 9,830' 9,822' 6,340 psi 3,830 psi Production Liner 994' 4-1/2" 10,600' 10,33483' 8,430 psi 7,500 psi 2 Perforation depth Measured depth See Attached Schematic N ED j��' 0 (1 15 True Vertical depth See Attached Schematic Tubing(size,grade,measured and true vertical depth) 3-1/2" 9.3#/L-80 9,567'MD 9,560'ND DHL Hydraulic Pkr 9,491'MD 9,484'ND Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 100 150 Subsequent to operation: 30 1 45 750 160 14.Attachments(required per 20 AAC 25 070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory LI Development Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-196 Contact Joe Kaiser Email jkaiserc hilcorp.com Printed Name Joe Kaiser Title Operations Engineer Signature .lr Phone 907-777-8393 Date Viy— 5-fig -15 �BDM MAY 1 1 2015 Form 10-404 Revised 5/2015 Submit Original Only ,3 /df/ice Hilcorp Alaska, LLC Well Operations Summary Well Name API Number Well Permit Number Start Date End Date SCU 12B-09 50-133-10126-02 213-062 4/13/15 4/14/15 Daily Operations: 04/13/2015- Monday PTW and JSA. Mobe to location and spot equipment. Rig up lubricator and pressure test to 250 psi low and 3,000 psi high. TP 300 psi. RIH w/2.75" dummy gun and tag at 10,483' (correlated to correlation log#3). POOH. Test plug equipment. RIH with 2.75"TTS magna range BP and attempt to tie into Pollard CBL log dated 12 Sep 14. Ran correlation log and sent to town. Correlation hard to figure out. Spot plug from Halliburton Plug Correlation log#3 at 10,443'.TP-300 psi. Pull up 30' and went back down and tagged plug. POOH. Mix cement and top fill 2" x 30' positive displacement bailer and go in hole. Dump bailer on top of plug at 10,443'. POOH and bailer dumped -ok. Clean and redress bailer. Add cement and go in hole and dump bail cement on top of plug at 10,443'.That gives 10'_of cement on top of plug. Cement in place at 2:23 AM. Rig down lubricator and clean bailer. 04/14/2015 -Tuesday PTW and JSA. Mobe to location. Rig lubricator back up. Pressure test to 250 psi low and 3,000 psi high. Arm gun. Field put 600 psi on tubing. RIH w/2-1/2" x 16' HC, 6 spf, 60 deg perf gun and tie into Halliburton plug correlation log dated 4-13-15. Run correlation log and send to town. Get ok to perf. Spot shot from 10,374' to 10,390'.TP-650 psi. Fired gun and tubing pressure went to 750 psi. POOH. Rig down lubricator and turn well over to field.TP-900 psi. Soldotna Creek Unit II Well: SCU 12B-09 SCHEMATIC Completion Ran:9/12/13 PTD:213-062 o Hikorp Alaska,UA: API: 50-133-10126-02 Ground Elev:120'Above MSL KB-THF:19.0'/KB-GL:18.6' i CASING DETAIL zz" J 2 [k Size Type Wt Grade Conn. ID Top Btm 20" Conductor - - - J-55 Surf 32' 11-3/4" Surf.Csg 47 8RD 11.00" Surf 2,009' 29 N-80 BTC 6.184" Surf 288' 26 N-80 BTC 6.276" 288' 1,048' 11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715' 3 26 N-80 BTC 6.276" 4,715' 6,543' 17,1 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830' 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600' 4 TUBING DETAIL 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567' IDV Collar @ 6,796' 'q 5 i +c. JEWELRY DETAIL i No. Depth ID OD Item 4t 1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box 6 i 2 20' 2.992" 4.470" _ X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin I, 3 2,752' 2.992" - 5.250" 3-1/2"SF0-1 Mandrel 8RD#1 a 1/1 4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2 1,1 5 6,802' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#3 7 l 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4 i i 7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5 j 8 9,395' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD Orifice#6 all 9 9,442' 2.992" 5.313" Chemical Injection Mandrel 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release) SY 9 11 9,534' 2.813" 4.500" X-Nipple i 1+ 12 9,567' 2.992" 4.470" WL Entry Guide 4 I I§ l , 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement 10 i 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell ,j ,)ni 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell ;*4 11 X •' 12 I' Top of Liner r � Hanger @ 9,606' 1 � Window @ 9,830' • V, PERFORATION DETAIL Id Date Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments di .,..---v 4/14/15 H-1 10,374' 10,390' 10,249' 10,256' 6 16 60 Open fH-1 9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 Isolated 13 AM11 1 fc1143' H-2 it.m?5r• . {•1.1r•r•r•r•r Tag10,494'RKBM .1.1. r•r•r•r•r @ :'1'1'1'1' 14 1f{?;{{f{r 2.25"bailer 12/20/14 •.1�1�1g1'1•' Lr•r•r•r•r •1.1.41• 15 +•1.1.1. •r•r•r•1r • r•1r•r•r•1r 11.. 4-1/2" ' • 1 SI,Shoe @ 10,600' openhole • ,• t 6"hole PBTD=10,570'MD/10,331'ND TD=11,412'MD/10,535'ND Max Deviation 78°@ 10,914' Max Dogleg 16.7°/100'@ 10,053' Downhole Revised:12/20/14 Updated by DMA 05/11/15 OF T� , (vi)P*I//j,cv THE STATE Alaska Oil and Gas ti�,;,. ��, ofALASIc;A Conservation Commission ___=_ 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OF ALASY'N- Fax: 907.276 7542 www.aogcc.alaska gov SCAN Joe Kaiser / _ Operations Engineer _ O(( Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Swanson River Field, Hemlock Oil Pool, SCU 12B-09 Sundry Number: 315-196 Dear Mr. Kaiser: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, ,p1P/ Daniel T. Seamount, Jr. Commissioner DATED this day of April, 2015 Encl. ,i �� IVED STATE OF ALASKA d,r'R 0 2 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 400CC 20 AAC 25.280 1.Type of Request: Abandon❑ Plug for Redril E Perforate New Pod❑ Repair Weill] Change Approved Program 0 Suspend❑ Plug Perforations 2 . Perforate❑., • Pull Tubing❑ Time Extension❑ Operations Shutdowi❑ Re-enter Susp.Wel ❑ Stimulate❑ Alter Casing❑ Other:❑ 2.Operator Name Hilcorp Alaska,LLC 4.Current Well Class. 5.Permit to Drill Number. Exploratory ❑ Development 2 - 213-062 • 3.Address 3800 Centerpoint Drive,Suite 100 Stratigraphic ❑ Service 111 • 6.API Number. Anchorage,Alaska 99503 50-133-10126-02-00 7.If perforating. 8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? CO 123B Soldotna Creek Unit(SCU)128-09 - Will planned perforations require a spacing exception? Yes ❑ No ❑ 9.Property Designation(Lease Number): 10.Field/Pool(s). A028997 • Swenson River Field I Hemlock Oil • , 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft). Effective Depth TVD(ft): Plugs(measured): Junk(measured): 11,412 • 10,535 - 10,570 10,331 N/A N/A Casing Length Size MD ND Burst Collapse Structural Conductor 32' 20" 32' 32 Surface 2,009' 11-3/4" 2,009' 2,009' 3,070 psi 1,510 psi Intermediate 9,830' 7" 9,830' 9,822 6,340 psi 3,830 psi Production Liner 994' 4-1/2" 10,600' 10,343' 8,430 psi 7,500 psi Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attached Schematic See Attached Schematic 3-1/2" 9.3#,L-80 9,56T Packers and SSSV Type: Packers and SSSV MD(t)and ND(ft): DLH Hydraulic Packer;N/A 9,491'WD/9,484'ND;N/A 12.Attachments. Description Summary of Proposal 2 13.Well Class after prop.sed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigrephic❑ Development 17/1 - Service ❑ 14.Estimated Date for • 15.Well Status after prop3sed work: Commencing Operations: 04/09/15 Oil Q . Gas ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Joe Kaiser Phone: 907-777-8393 Email jkaiserE hilcorn.con1 Printed Name Joe Kaiser Title Operations Engineer Signature677/404/q.. Pbr a)c, 1)4--C Phone 907-777-8393 Date yr/Zil COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. 1 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Spacing Exception Required? Yes ❑ No [1( Subsequent Form Required' ;0-- VC I APPROVED BY l!/ Approved by: COMMISSIONER THE COMMISSION Date: / )i(--;- %c, 41-6,-/c /eA ii-g-/-5' Submit Form and Form 10-403(Revised 10/2012) pproVed application 01RileottNAILlate of approve. A achments i Duplicate RBDMS�� APR 9 2015 , i�7/ 5 /. Well Prognosis Well: SCU 128-09 [lilcorp Alaska,Lb Date:4/01/2015 Well Name: SCU 12B-09 API Number: 50-133-10126-02 Current Status: Gaslifted Oil Well Leg: N/A Estimated Start Date: April 9, 2015 Rig: N/A Reg.Approval Req'd? 403 Date Reg.Approval Rec'vd: Regulatory Contact: Donna Ambruz 777-8305 Permit to Drill Number: 213-062 First Call Engineer: Joe Kaiser (907) 777-8393 (0) (907) 952-8897 (M) Second Call Engineer: Chad Helgeson (907)777-8405 (0) (907) 229-4824 (M) AFE Number: Current Bottom Hole Pressure: —400 psi @ 10,280' TVD (Based on Survey taken on 9/15/14.) Maximum Expected BHP: — 1,200 psi @ 10,249' TVD (Estimate based on offset wells Max.Allowable Surface Pressure: — 175 psi (Based on gas gradient[0.10psi/ft]) Brief Well Summary Soldotna Creek Unit 12B-09 was drilled as a sidetrack of SCU 23A-09 and the liner was run in September 2013. A gaslift completion was ran in September 2013 with perforations in the Hemlock H-2 bench added thru tubing. April 2015 / the gas reservoir was depleted sufficiently. Plan is to isolate the H-2 with a thru-tubing plug and perforate the H-1 in • April 2015. Notes Regarding Wellbore Condition • Well is shut-in. Recent test on 3/23/2015 was 58 mcfd at 160 psi.' OBJECTIVE OF WORKOVER Plugback H-2.Add new perfs in the Hemlock H-1 bench. E-line Procedure: 1. MIRU E-line, PT lubricator to 3,000 psi Hi 250 Low. 2. RU gauge ring assembly. RIH and tag bottom. POOH 3. RU 2.75"Through tubing bridge plug. RIH with plug. 4. Set 2.75" plug in 4.5" liner at 10,443'. POOH 5. RU bailer assembly. RIH with bailer assembly. Dump bail +/- 10'of cement. POOH. 6. Rig up gas lift lines to tree. Production to gaslift off top of well to achieve desired underbalance. a. Est BHP= 1L200 psi. Est hydrostatic= 1,040 psi. (Fluid level at GLM #6 at 9395' MD and SITP of 200 psi) 7. RU 2.5" 6 spf HC wireline guns(6spf shot density). 8. RIH and perforate Hemlock H-1 interval from 10,374'-10,390' (16'). 9. RD E-line. 10. Turn well over to production. Attachments: 1. Current Schematic 2. Proposed Schematic Soldotna Creek Unit Well: SCU 12B-09 ACTUAL SCHEMATIC PTD:: pleb- Ran:9/12/13 • "'I`"'°Ala"kn,LU. API: 50-133-10126-02 Ground Elev:120'Above MSL KB-THF:19.0'/KB-GL:18.6' 1 --� CASING DETAIL 22" Z Size Type Wt Grade Conn. ID Top Btm 20" Conductor - - - Surf 32' 11-3/4" Surf.Csg 47 J-55 8RD 11.00" _ Surf 2,009' _ 29 N-80 BTC 6.184" _ Surf _ 288' 26 N-80 BTC 6.276" 288' 1,048' 11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715' 3 EZIIM 26 N-80 BTC 6.276" 4,715' 6,543' l+l si 29 N-80/P-110 BTC/8RD 6.184" 6,543' _ 9,830' 4 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600' TUBING DETAIL ivi, 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567' iii 0 DV Collar @ 6,796' '+a 5 is JEWELRY DETAIL ii No. Depth ID OD Item 1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box 6 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin 41 3 2,752' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#1 i l % 4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2 ' 5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3 6 _ 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4 ', r" 7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5 �9i iii8 9,395' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD Orifice#6 8 9 9,442' 2.992" 5.313" Chemical Injection Mandrel "' CV 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release) j,+ 9- is 11 9,534' 2.813" 4.500" X-Nipple -1 M1) 12 9,567' 2.992" 4.470" WL Entry Guide I :..I I I, 13 _ 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 10 Lu'+� 14 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell .•—•., d Y ' 11 ''.. 12 gi t; Top of Liner . hip P Hanger @ 9,606' 7 i,j Window @ 9,830' . . PERFORATION DETAIL . Date Zone Top(MD) _ Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments 9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 2-1/2"HC Connex H-2 • �1f7r7i7r71 '�r�'�'Sr Ta 10,494'RKBM 7.7.7.7.7. {tirtirtirtir g 13 ,:;fti{;:; 2.25"bailer 12/20/14 ,{!iti 1A7. .47f{f7 127 • f.f.f.f.f 14 f1.°f{itiC1�7.1.7. 4-1/2" ; h.-4," '. Shoe @ 10,600' openhole 'f. s ' 6"hole PBTD=10,570'MD/10,331'ND TD=11,412'MD/10,535'ND Max Deviation 78°@ 10,914' Max Dogleg 16.7°/100'@ 10,053' Downhole Revised:12/20/14 Updated by STP 1/02/15 do Well:SolSCUtnaCreek 12B-09Unit II PROPOSED SCHEMAl IC Com lets nRan:9/12/13 13 Hilrnrp Alaska,LLC API: 50-133-10126-02 Ground Elev:120'Above MSL KB-THF:19.0'/KB-GL:18.6' 1 CASING DETAIL zz" di.1 2 Size Type Wt Grade Conn. ID Top Btm 20" Conductor - - - Surf 32' 11-3/4" Surf.Csg 47 1-55 8RD 11.00" Surf 2,009' 29 N-80 BTC 6.184" Surf 288' 26 N-80 BTC 6.276" 288' 1,048' 11-3/4" 7" Intermediate 23 N-80 BTC 6.366" 1,048' 4,715' 3 26 N-80 BTC 6.276" 4,715' 6,543' 29 N-80/P-110 BTC/8RD 6.184" 6,543' 9,830' 4-1/2" Prod Liner 12.6 L-80 DWC/C-HT 3.958" 9,606' 10,600' a ill TUBING DETAIL ° 3-1/2" Prod Tubing 9.3 L-80 EUE 8RD 2.992" Surf 9,567' IDV Collar @ 6,796' +w 5 4% ivil 141 JEWELRY DETAIL 1, No. Depth ID OD Item 1 19' 2.992" - Tubing Hanger,3-1/2"IBT Box x 3-1/2"IBT Box 6 MIR ' 4.4 2 20' 2.992" 4.470" X0,3-1/2"IBT Pin x 3-1/2"EUE 8RD Pin 03 2,752' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#1 4 4,996' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#2 5 6,802' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#3 7 6 8,000' 2.992" 5.250" 3-1/2"SFO-1 Mandrel 8RD#4 t' It 7 8,844' 2.992" 5.250" 3-1/2"SF0-1 Mandrel 8RD#5 3i 8 9,395' 2.992" 5.250" 3 1/2"SFO 1 Mandrel 8RD Orifice#6 8 1 9 9,442' 2.992" 5.313" Chemical Injection Mandrel 10 9,491' 3.000" 5.875" DLH Hydraulic Packer(58k Pull to Release) 9 i' 11 9,534' 2.813" 4.500" X-Nipple 12 9,567' 2.992" 4.470" WL Entry Guide I gam I 4 13 10,443' 3.958" 2.75"Plug(TTS 4200-275-AC-001)w/10'cement 10 + 14 10,527' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 0 15 10,545' 4.000" 5.630" FREECAP Swell Packer,5'FSC-11 Rubber,Water Swell 11 X #" 12 — t', Top of Liner ,; Hanger @ 9,606' Rif 7 MI Window @ 9,830' liw 1.1 '; PERFORATION DETAIL Date Zone Top(MD) Btm(MD) Top(TVD) Btm(TVD) SPF Ft Phase Comments / Proposed H-1 10,374' 10,390' 10,249' 10256' 6 16 60 2-1/2"HC Connex V p H-1 9/15/13 H-2 10,448' 10,494' 10,280' 10,300' 6 46 60 2-1/2"HC Connex 13 ,r>1 H-2 �tiftif1ftiryr i!.1'.l.r.r iy.ti.ti.ti.ti. ...ti.ti.ti.ti. f.f.f.r.r Tag @ 10,494'RKBM 14 II :f;:;fti f 2.25"bailer 12/20/14 ,ti.ti.ti.:::: r.r.r.r.f 151,4111 1ti'ti�:r•r r"'}r} ••ti•ti• .Shoe @ 10,600' 4 opCnholc w 6"hole PBTD=10,570'MD/10,331'ND TD=11,412'MD/10,535'ND Max Deviation 78°@ 10,914' Max Dogleg 16.7°/100'@ 10,053' Downhole Revised:12/20/14 Updated by STP 1/02/15 Hilcorp Alaska, LLC SCU 12B-09 FINAL WELL REPORT DML LOGGING DATA Provided by: Approved by: Kevin Eastham Compiled by: Larry Resch Michael Sherry Jane Grundin Daniel Hillegeist M i k e S t r a w n Distribution: 10/31/2013 TD Date: August 26, 2013 SCU 12B-09 1 TABLE OF CONTENTS 1 MUDLOGGING EQUIPMENT & CREW ................................................................................................2 1.1 Equipment Summary ......................................................................................................................2 1.2 Crew................................................................................................................................................2 2 WELL DETAILS .....................................................................................................................................3 2.1 Well Summary.................................................................................................................................3 2.2 Hole Data........................................................................................................................................3 2.3 Well Synopsis. ................................................................................................................................4 2.4 Daily Activity Summary...................................................................................................................6 3 GEOLOGICAL DATA...........................................................................................................................14 3.1 Lithostratigraphy ...........................................................................................................................14 3.2 Lithologic Details...........................................................................................................................15 3.3 Connection Gases ........................................................................................................................17 3.4 Trip Gases ....................................................................................................................................17 3.5 Sampling Program / Sample Dispatch..........................................................................................18 4 DRILLING DATA..................................................................................................................................19 4.1 Directional Survey Data................................................................................................................19 4.2 Bit Record.....................................................................................................................................23 4.3 Mud Record ..................................................................................................................................24 5 SHOW REPORTS ...............................................................................................................................27 6 DAILY REPORTS ................................................................................................................................28 Enclosures: 2” / 100’ Formation Log (MD/TVD) 2” / 100’ Drilling Dynamics Log (MD/TVD) 2” / 100’ LWD Combo Log (MD/TVD) 2” / 100’ Gas Ratio Log (MD/TVD) Final Data CD SCU 12B-09 2 1 MUDLOGGING EQUIPMENT & CREW 1.1 Equipment Summary Parameter Equipment Type / Position Total Downtime Comments Mudlogging Unit Computer System Canrig: 3 HP Compaq Workstations (DML, RigWatch, and Sample Catcher) 0 Ditch Gas Canrig: (2) QGM Gas Traps (with High RPM Electric-Powered Agitators) Canrig: E-Series FID THA Analysis and Chromatography. 0 Pason EDR All Drilling Parameters 0 Block Height / Depth Pason WITS Feed 0 Hookload / WOB Pason WITS Feed 0 RPM Pason WITS Feed 0 Torque Pason WITS Feed 0 Return Flow Pason WITS Feed 0 Pit Volumes Pason WITS Feed 0 Mud Gain/Loss Pason WITS Feed 0 Pump Pressure Pason WITS Feed 0 Pump Strokes Pason WITS Feed 0 Rate of Penetration Calculated from Block Position tracking 0 Mud Flow In Calculated from Pump Output/Rate tracking 0 1.2 Crew Unit Number : ML030 Unit Type : Arctic Steel Skid Unit Mudloggers Years* Days*2 Sample Catchers Years Days*2 Technician Days Larry Resch 13 47 Jane Grundin ML Trainee 52 Michael Sherry 1 50 Nick Barber ML Trainee 12 Daniel Hillegeist 1 7 Dickey Hudgins 1 28 Michael Strawn 5 5 *1 Years experience as Mudlogger. *2 Days at well site. SCU 12B-09 3 2 WELL DETAILS 2.1 Well Summary Well: SCU 12B-09 API Number: 50-133-10126-02-00 Field: Swanson River Field Surface Co-Ordinates: 2616’ FSL, 2050’ FWL Sec 9, T7N, R9W SM Borough: Kenai Borough Primary Target Depth: Hemlock H7 10390’TVD State: Alaska TD Depth: 11412’MD /10532’TVD Rig Name / Type: Saxon 169/ Double Suspension Date: N/A Primary Target: Hemlock Formation Permit to Drill: 213062 Spud Date: July 16, 2013 Ground Elevation: 126.3’ AMSL Completion Status: Run 4-1/2” liner RKB Elevation: 143.8’ AMSL Classification: Development Oil Secondary Target: Depth: Tyonek G-2 10218’TVD TD Formation: Hemlock TD Date: August 26, 2013 Days Drilling: 41 Days Testing: None 2.2 Hole Data Maximum Depth Shoe Depth FIT (ppg) Hole Section MD (ft) TVDSS (ft) TD Formation Mud Wt (ppg) Dev. (oinc) Casing/ Liner MD (ft) TVDSS (ft) Tyonek 1.05 7” 9830’ -9679 13.5 6” 11412 -10389 Hemlock 8.9 78.21 4.5 10609’ -10202 N/A SCU 12B-09 4 2.3 Well Synopsis. SCU 12B-09 is the eight in a series of wells drilled by Hilcorp during the 2012-2013 drilling season. A sidetrack of the parent well SCU 23A-09, SCU 12B-09 was designed with a strong deviated build from a window cut through existing 7” casing at 9831’MD. Targets include the Lower Tyonek G2 sand and the Hemlock H 7 and 10 sands. Existing 7” casing was penetrated between 9831’MD and 9846’MD with initial hole drilled to 9870’MD with a casing cutting mill. After displacing the bore to 10.45 ppg drilling fluid an FIT was conducted successfully to 13.5 ppg EMW. After pulling out of the hole and picking up a PDC bit, mud motor at 1.2 degrees, directional tools and LWD, drilling commenced at 9870’MD. Initial attempts to slide and build hole angle at 8 degrees per 100 ft were met with minimal results of 6 degrees or less. Changing the motor to 1.4 degrees produced similar results. Directional error at 10243’MD indicated the track to be 46.3 ft low and slightly right of the line. At 10262’MD/ 10240’TVD 100% loss of returns was experienced. Several days and many attempts to circulate/ squeeze various LCM products ultimately met with resulting losses cut to 6 bph. Total losses for this event exceeded 3200 bbls. An attempt to drill ahead was made, only to loose 100% returns at 10271’MD/ 10249’TVD. The decision to plug back and side track required three separate cement jobs to plug the hole back inside the casing window. Operations on the initial bore hole, now known as SCU 12B-09 PB1 were suspended on August 3, 2013, and preparations were made to drill a sidetrack well: SCU 12B-09. After drilling/ dressing cement from 9207’MD thru the window to 9843’MD a trip was made out to pick up a PDC bit on 1.8 degree mud motor with OnTrak and wireline Gyro equipment. Hole drilled from 9843’MD to 10001’MD proved unsuccessful in obtaining necessary angle of build. The decision was made to pull out of the hole and re-run the tri-cone insert bit on a 2.2 degree motor and remove the near bit stabilizer which achieved positive hole angle build results. At 10509'MD a trip was made for a pdc bit on 1.2 mud motor. On the trip in to bottom, tight hole was encountered at 10349'MD. After washing and reaming from 10349’MD to 10569'MD it was determined that an inadvertent side-track was started. The decision was made to pullout of the hole and change over to a tri-cone insert bit on 1.4 degree motor. The second ‘ghost’ bore hole from the window to TD at 10509’MD became known as SCU 12B-09 PB2. Drilling continued on the current bore SCU-12B09 from 10569’MD. Full returns were lost at 10602’MD. Once returns were established we circulated bottoms up and observed 5911 units of gas and oil in the pits. Drilling continued from 10602’MD to 11029’MD where instantaneous loss of returns were experienced once again. Upon regaining returns to surface significant oil and gas were observed, with maximum gas readings approaching 6700 units. Various LCM products were pumped down over the next several days in an effort to regain circulation without success. Rig tripped out of hole to surface and serviced MWD tools. After tripping back in to 10026’MD, mud was conditioned and circulated. As they proceeded to trip in to 11029’MD, circulation was lost. The rig drilled from 11029’MD to 11036’MD. Another LCM pill was pumped to bottom and allowed to soak. The hole was drilled from 11036’MD to 11067’MD. More LCM was pumped down in an attempt to regain circulation. Rig drilled from 11067’MD to 11099’MD. Several more LCM pills were pumped down hole and circulation was reestablished. Returns to surface brought oil up over the shakers and a maximum gas reading of 6460 units. The rig tripped out of the hole five stands and circulated gas. Rig tripped out to 9765’MD to service MWD tools, then tripped back into hole to 11099’MD. Well lost circulation and returns. Several more heavy LCM pills were pumped down the well then rig drilled from 11099’MD to 11161’MD. Another LCM pill was pumped down hole and allowed to soak. Rig then drilled from 11161’MD to 11412’MD. An attempt to circulate bottoms up yielded no returns to surface. The rig tripped out of hole to 9773’MD and monitored well. The rig tripped out of hole to surface and rig was serviced. SCU 12B-09 5 Once to surface, MWD logs were collected and analyzed. It was determined that the well had entered the H10 Hemlock. It was decided to drill ahead. Rig tripped in to 11020’MD and hole was tight. Rig washed and reamed down to 11069’MD. Partial circulation was gained and oil and gas were circulated out of hole. Well shut in due to gas pressure and circulated through their choke. Rig tripped out of hole to 10878’MD and gas was circulated out of the hole. A maximum gas reading of 5172 units was observed while circulating. Rig shut in well and circulated through choke. Rig tripped back into hole to 11006’MD and an LCM pill was pumped down hole to gain better circulation. They tripped out to 9769’MD and monitored well. Ten barrels of drilling fluid were pumped down hole every half hour with no returns to surface. Rig tripped out to surface. Due to well conditions, it was decided to call TD at 11412’MD. After rig was serviced, it was decided to trip back into hole to wash and ream. In the prior run, the BHA had encountered communication issues and no surveys after 10914’MD had been recorded. BHA with survey tools and well commander tripped back into hole to 10169’MD and circulated bottoms up. The rig washed and reamed from 10169’MD to 10390’MD. Rig tripped out of hole to 10136’MD and circulated. Rig proceeded to wash and ream from 10166’MD to 10768’MD, where circulation was lost. An LCM pill was built and pumped down the well and then pulled out of hole to 9820’MD. Pill was allowed to soak and rig was serviced. Circulation was regained. Rig tripped into hole from 9820’MD to 10373’MD and tagged a bridge or ledge. Rig washed and reamed from 10373’MD to 10690’MD where well lost circulation. Rig tripped out of hole to 9768’MD. Well commander encountered technical difficulties and rig was unable to pump fluid down pipe. LCM pill was pumped down annulus while rig worked to troubleshoot well commander at 9815’MD. Rig tripped out of hole from 9815’MD to 9489’MD. Circulation through well commander was reestablished. Rig tripped down from 9489’MD to 10383’MD where mud was conditioned and circulated. Circulation was lost and an LCM pill was pumped down the hole. Rig pulled out of hole to 9470’MD to allow LCM pill to soak. Well commander encountered a problem and rig was unable to pump fluid down pipe. Well attempted to troubleshoot problems before tripping out of hole to surface. BHA was serviced, removing formation and LCM from inside BHA. Rig ran back into hole to complete washing and reaming. Bit took weight at 10328’MD. Rig washed and reamed well from 10328’MD to 10610’MD. Sweeps were pumped down and circulated to clean out hole. A 45 BBL pill was pumped down and displaced out of pipe. No losses were observed. Rig pulled out of hole to surface to prepare for liner job. Rig tripped back into hole with 4.5” liner to 10609’MD and cement was pumped. There were no significant losses to circulation while running liner into hole or during cement job. SCU 12B-09 6 2.4 Daily Activity Summary July 14, 2013: Test casing to 3000 PSI for 30 minutes un-charted. Change out wash pipe. Test 9849 ft of 7” casing to 3000 PSI and hold for 30 minutes. Prep rig floor and rig down to POOH. POOH from 9849 ft to jars. Turn elevators around to lay down jars. Lay down BHA. Rig Service rig and change out grabber dies. July 15, 2013: RIH with whipstock to 9796 ft. Displace well with 10.5 ppg 6% KCl PHPA mud. Rig up wireline tools. RIH with gyro. Orient whipstock, tag at 9849 ft; gyro tool face set at 307 degrees. Log/ survey while POOH with wireline. Rig down wireline. Set whipstock. Mill out window. July 16, 2013: Mill window in casing and rat hole from 9854 ft to 9870 ft. Pump sweep, circulate, rotate, and reciprocate/polish window. Conduct FIT to 13.5 ppg emw; flow check. Pump slug. POOH from 9870 ft. Lay down BHA #2; clean floor of all unneeded tools. July 17, 2013: Continue laying down BHA #2, clean floor of all un-needed tools. Rig service, clean floor, grease crown, wash pipe, top drive. P/U directional tools, BHA #3, scribe tools. Test MWD tools. RIH. July 18, 2013: Slip and cut 75 ft drilling line. Test MWD tool. Circulate sweep. Rig up wireline tools. Wireline PJSM with wireline crew; rig down wireline. PJSM with crew for POOH and clean and prep floor. Flow check PJSM POOH for sub in BHA from 9862 ft to 483 ft. BOP drill while for TIH procedures. Finish POOH. Lay down directional tools / remove source. Clean and clear rig floor. Test BOP’s. July 19, 2013: Test BOP components. Test blind Rams to 250 psi and 4000 psi. Pull test plug and install wear bushing. PJSM with directional driller and rig crew for making up BHA. M/U bit, motor, UBHP and orientate UBHO. PJSM with MWD and RPS to install sources. M/U BHA. M/U directional tools; test MWD tool. POOH for MWD failure. Unload radioactive sources. Lay down MWD tools; P/U new tools and upload data. July 20, 2013: Continue TIH to 9747 ft. Test MWD tool. TIH from 9747 ft to 9867 ft. PJSM with wireline, DD, and rig crew about wireline inside DP. Rig up and run wireline logs. Slide from 9870 ft to 9965 ft. POOH to remove side entry sub. POOH with wireline; Rig down wireline equipment. Drill from 9965 ft to 10015 ft. ft July 21, 2013: Drill / slide from 10015 ft to 10087 ft. Trip out 5 stands and wait on rig orders. Rig service: grease blocks top drive, DW, swivel, check dead man bolts and BOP drill. Trip out of hole to dial up motor. Rig service/grease TD, DW, check all fluids. POOH. Unload radioactive sources, L/W directional tools. Adjust motor to 1.4 degree bend, load data, load radioactive sources. July 22, 2013: TIH from 5126 ft to 10088 ft. Slide from 10088 ft to 10131 ft. Rotate from 10131 ft to 10158 ft. Slide from 10158 ft to 10173 ft. Rotate from 10173 ft to 10197 ft. Slide from 10197 ft to 10204 ft. Drilling from 10204 ft to 10246 ft. SCU 12B-09 7 July 23, 2013: Lost circulation at 10262 ft; pumped down hole and down back side. POOH to shoe. Build two LCM pills and spot down hole. Fluid loss 303 BBL. Build surface volume and LCM pills. TIH from 9846 ft to 10262 ft. Pump 50 BBL 35 lb per BBL LCM pill. POOH from 10262 ft to 9814 ft. Pump mud down backside to fill hole and check for loses and continue to re-build surface volume. RIH from 9847 ft to 10262 ft. Pump 23 BBL of 35 lb per BBL LCM pill. Pump on backside and squeeze 16 BBL. Filled hole with trip tank and monitor well. Pumped second 23 BBL of 35 lb LCM pill. Pumped on backside and squeezed 19 BBL. Filled with trip tank and monitor well. Pump 23 BBL of 35 lb LCM pill. July 24, 2013: Finished chasing 23 bbl, 35 lb per bbl pill outside of bit. POOH inside window. Built mud volume. RIH to bottom to pump 23 bbl, 35 lb per bbl LCM pill. Closed bag, and squeezed pill with 18.5 bbl mud; maximum pressure 320 PSI. RIH to bottom and drill ahead. Drilled 8 ft of new formation with initial returns; lost returns shortly after; lost 167 bbl. Spotted 23 bbl, 50 lb per bbl LCM pill on bottom and POOH to inside window. July 25, 2013: Spotted 25 BBL, 20 lb per bbl LCM pill. Squeezed 19.6 bbl at 244 psi. Tripped up inside window. Monitored well; 34.5 BPH static losses. Built mud volume. Checked static well losses again; 70.5 BPH. RIH to bottom to spot another 25 bbl, 20 lb per bbl LCM pill. Monitored well; ~30 BPH static losses. July 26, 2013: Monitor well with trip tank while building surface mud volume. POOH from 9775 ft to 8907 ft. Rig service: greased draw works, tongs, inspected slips and checked oil levels. POOH from 8904 ft to 5909 ft slowly and monitor losses. POOH from 5909 ft to 735 ft; lay down HWDP from 735 ft to 405 ft; lat down well commander sub and jars. Lay down directional tools. Unload radioactive sources. Download date from BPCM. Lay down mud motor. Test MWD tool. Clean and clear rig floor. Remove wear bushing/flush out top drive with water. July 27, 2013: Test BOP’s. Pull test plug; install wear bushing and blow down choke manifold. PJSM with Weatherford; RU power tongs and get all tools on floor to run 2-7/8” tubing. Run 30 joints of 2-7/8’ tubing from surface to 953 ft. Rig down Weatherford tool and equipment. Rig service; grease blocks, crown, top drive. RIH from 957 ft to 7450 ft. July 28, 2013: Monitor well with trip tank while rigging up Schlumberger cementers. Rig up and pump cement plug. Trip from 10262 ft to 8566 ft. Pump nerf ball through pipe to clear pipe; circulate 186 bbl bottoms up. Monitor well on trip tank with losses of 7.3 BPH. Wait on cement 8-10 hours; monitor well for losses. RIH from 8561 ft to 9200 ft. Wash down from 9200 ft to 10271 ft. Build Baro-Seal pill; monitor well with trip tank. Pump 23 bbl of Baro-Seal and chase with 30 bbl of mud. Monitor well with trip tank; build 80 lb per bbl of Baracarb pill. Pump 23 bbl of 80 lb per bbl Baracarb pill. July 29, 2013: Squeeze Baracarb pill. Monitor well with trip tank. Continue to squeeze Baracarb pill. Circulate bottoms up. Monitor well with trip tank. Pumped 21 bbl of 20 lb per bbl Baracarb; chase with 105 bbl of 10.2 ppg mud. POOH from 10263’ to 9500’. Squeeze 17.5 bbl of 80 lb per bbl pill. Hold 161 psi on back side while letting seep into formation. Squeeze remaining 4 bbl of 80 lb per bbl pill. Hold 162 psi on back side while letting seep into formation. RIH from 9509’ to 10263’. Monitor well with trip tank. PJSM with Schlumberger cementers: Prepare to pump second cement job. Pump 1 bbl of H2O; pressure test lines to 3500 psi. Pump 10 bbl of 12.0 ppg mud push; pump 50 bbl 16.5 ppg cement. Pump 5 bbl 12.0 ppg mud push; displace with 83 bbl of mud. Rig down cement equipment. POOH 30 stands. SCU 12B-09 8 July 30, 2013: Circulate surface to surface. Monitor well on trip tank. Wait on cement. Monitor well with trip tank for 15 minutes; zero losses. RIH to tag cement from 8379 ft to 8800 ft; wash from 8800 ft to 9300 ft, no tag. Circulate bottoms up; signs of cement returns. Wash from 9300’ to 9500’. Circulate bottoms up; signs of cement returns. POOH from 9500 ft to 9300 ft. Monitor well on trip tank for 15 minutes; zero losses. Wait on cement. Rig service: greased draw works, top drive, brake linkage, crown, adjusted brake handle, checked oil, floor motor, top drive, rotary table, gear-ends of mud pumps. Wait on cement. RIH from 9317 ft to 10002 ft. Condition mud and circulate. July 31, 2013: POOH from 10002 ft to 757 ft. Well control drill while tripping. Rig down drill pipe handling equipment. Rig up tubing equipment. Lay down 2-7/8” tubing from 757 ft to 400 ft. Repair brake linkage; service rig. Lay down 2- 7/8” tubing from 400 ft to surface. Rig down tubing equipment. PJSM: Pick up rotary BHA. Make up BHA and begin to run in hole to 350 ft. August 1, 2013: Continue to run in hole from 350 ft to 9933 ft. Wash down from 9933 ft to 10006 ft. Drill/dress cement. Condition mud and circulate. Pump dry job. POOH from 10020 ft to BHA. Lay down BHA. Rig up Weatherford, change handling equipment. Rig up third party tubing equipment; hold PJSM; strap pipe. Run in hole with 2- 7/8” tubing from Surface to 799 ft. Rig down third party tools and prep floor to run in hole with drill pipe from 799 ft to 2620 ft. August 2, 2013: Circulate and reciprocate pipe at 10020 ft at 247 gpm, 1115 psi. Rig service. Rig up SLB to pump cement / mix mud push; 12 lb. PJSM with all involved, batch and pump as per Schlumberger program. Schlumberger displace cement with 87BBL 10.2 PPG mud. POOH from 10020 ft to 8400 ft. Condition mud and circulate; drop wiper ball; brake circulation at 4 bpm; increase rate to 8 bpm; surface to surface with 10.2 PPG mud. Slip and cut 78 ft drill line. Pump slug; POOH from 8400 ft to top of BHA at report time. August 3, 2013: Continue to POOH; lay down 2-7/8” tubing. With plug back complete and drill string on the bank, this concludes SCU 12B-09 PB. Future drilling reverts back to the well name SCU 12B-09 August 2, 2013: Circulate and reciprocate; GPM = 247; SPP = 1115. Rig service. R/U to pump cement / mix mud push; 12 lb. PJSM with all involved, batch and pump as per Schlumberger program. Schlumberger displace cement with 87BBL 10.2 PPG mud. Trips; POOH from 10020’ to 8400’. Condition mud and circulate; drop wiper ball; brake circulation @ 4 BBL/min; increase rate to 8 BBL/min; surface to surface with 10.2 PPG mud. Cut off drilling line; slip and cut 78’. Pump slug; POOH from 8400’ to 7160’. POOH from 7160’ to 799’. S/M with Weatherford hand and L/D 2 7/8” tubing. L/D 2 7/8” tubing from 799’-1’. August 3, 2013: R/D tubing equipment. Drain stack and pull wear bushing. S/M over pressure testing. Flush stack with fresh water; install test plug; flush with fresh water through kill line and HCR line to poorboy degasser. R/U BOP test equipment. Test BOP; annular 250/2500 PSI; test rams; choke; kill and string valves to 250-4000 PSI for 10 minutes each; all tests charted. Test BOP. Pull test plug; set wear ring; blow down choke manifold. Trips; P/U BHA; load pipe rack with 17 JTS HWDP; strap. TIH from 313’ to 996’. Waiting on orders: one slip die came out of bottom portion of DP slips when pulling slips during connection, resulting on die going down hole. SCU 12B-09 9 August 4, 2013: Safety meeting over gently POOH while pulling die up with BHA. Slowly POOH from 996’ to 20’. Fish slip die out of BOP. Install wear bushing. TIH from 0’ to 996’. TIH from 996’ to 3600’. Trips; RIH from 3824’ to 9076’; tag cement. Condition mud and circulate; brake circulation at 4 BBL; wash down to 9207; tag hard cement. Drill hard cement at 9207’; WOB 2/4k; increase WOB 5/8k. Drill cement from 9500’ to 9843’; WOB 12. Circulate, reciprocate, condition mud. August 5, 2013: Rig service. POOH from 9843’ to 6800’. TOOH; L/D BHA. Trips; P/U BHA L/D MWD; reprogram LWD. Condition mud and circulate; shallow pulse test at 250’, 235 GPM, 5.5 BBL. Trips, CON-RIH. Rig service. Trips, CON-RIH to 4649’. TIH from 4649’ to 9814’. Rig up gyro equipment; S/M. RIH with gyro. August 6, 2013: Orient gyro tool. Slide/drill cement from 9843’ to 9880’. Drill actual / slide drilling from 9880’ to 9889’. Deviation survey; reinitiate gyro; and wire side entry sub pack off. Drill actual / slide drilling from 9889’ to 10,001’. Deviation survey / gyro confirmation. Condition mud and circulate; work pipe while waiting on orders. Trips / JSA to POOH, R/D wireline, gyro. Rig down wireline and gyro equipment. August 7, 2013: POOH from 9820’ to 149’. L/D subs; download data from MWD; check motor bearings; inspect bit. Adjust degree of motor; M/U subs; M/U directional BHA. Trips; RIH with 2.1 degree motor (RIh slow). Drill actual, slide drilling from 10001’ to 10072’ @ 250 GPM, 18/20K WOB. Slide from 10072’ to 10125’. Rotate from 10125’ to 10139’. Slide ahead. August 8, 2013: Slide from 10140’ to 10193’. Rotate from 10193’ to 10205’. Slide from 10205’ to 10230’. Rotate from 10230’ to 10245’. Slide from 10245’ to 10255’. Rig service. Slide from 10255’ to 10270’. Drill actual; slide drill from 10270’ to 10300’. Condition mud and circulate. Drop mud weight from 9.5 to 9.2 (in, out). Rig service; blocks crown, top drive, draw tool, monitor well. Drill actual; slide drill from 10300’ to 10345’; back ream full stand @ 43 RPM; 12/18K on bit. August 9, 2013: Rotate from 10396’ to 10446’. Slide from 10446’ to 10469’. Rotate from 10469’ to 10483’. Slide from 10483’ to 10487’. Rotate from 10487’ to 10500’. Rig service. Rotate from 10500’ to 10509’. Condition mud and circulate and reciprocate. Trips; POOH from 10509’ to 9787’; flow check; monitor well (no flow). Condition mud and circulate; pump dry job. Trips; continue POOH from 9787’ to MWD. Download MWD date; L/D directional tools. Pull wear bushing; install test plug. August 10, 2013: Test BOPs. Set wear bushing. L/D test joint. P/U BHA; change motor bend to 1.2; download tools. Fire drill; poor response; training in all alarms and drills. Continue directional BHA; load nuclear source; shallow pulse test. RIH with 1.2 degree motor to 9772’. Cut and slip 92’ of drill line. Rig service. Re-log from 9850’ to 10509’ at 180 max ROP. August 11, 2013: Tight hole / wash down from 10349’ to 10409’. Directional work; MAD pass; W/R from 10409’ to 10509’. Drill actual from 10509’ to 10557’. Slide from 10557’ to 10566’. Spot lube pill and reciprocate pipe. Slide from 10566’ to 10569’. Short trip 6 stands two times from 10569’ to 10221’. August 12, 2013: Circulate bottoms up; reciprocate pipe. POOH from 10569 to 7000’. Trips; TOOH from 7000’ to 292’. Directional work; L/D BHA, unload nuke, DN link tools. Directional work; P/U new mud motor, orient, load nukes. Condition mud and circulate; shallow pulse test (test good). Trips from surface to 2929’. Trips from 2929’ to 10569’; circulate B/U. Drill ahead. SCU 12B-09 10 August 13, 2013: Slide from 10568’ to 10588’. Rotate from 10588’ to 10593’. Hole taking mud; idle pump and send LCM down hole. Rotate from 10593’ to 10599’. Slide from 10599’ to 10602’; drilling with partial returns. Lost returns; pump LCM; build 30 lbs LCM in active; work to re-establish returns; reciprocate pipe. Condition mud and circulate; lost circ; work pipe; spot pills on bottom; pump 30 BBL down backside. Condition mud and circulate; drop ball shift well commander; break circulation; pump 20 BBL. Condition mud and circulate; break circulation @ 4 BBL, pump 2nd 80 lb BBL pill. Trips; stand back 2 stands while pill soaks. Condition mud and circulate; pump down backside with holefill. Regain circulation; circulate bottoms up; 5910 units of wiper gas. August 14, 2013: Dropped ball to deactivate well commander. TIH 5 stands from 10341’ to 10585’; tag fill @ 10585’; wash down to bottom from 10585’ to 10602’. Slide from 10602’ to 10620’. Drill from 10620’ to 10625’. Perform BOP drill (well secured in 45 seconds). Drill from 10625’ to 10716’. Rig service. Drill from 10716’ to 10782’. Drill from 10782 to 10824’. August 15, 2013: Troubleshoot MWD; tool quit pulsing. Rig service; greased DW; check oil. Build a dry job and prep rig floor to TOH. TOH from 10824’ to 9844’. Clean floor; pump dry job. TOH from 9844’ to 8041’. Bit hours = 14.1 hours. TOH from 8041’ to directional tools. Unload radioactive sources/ L/W Monel; D/L data; P/U Monel; M/U new bit scribe motor; upload data. Finish loading data; pull and clean filter; M/U Monel; S/M with MWD before loading R/A sources; load R/A sources; surface test MWD tool. TIH from 349’ to 9000’; slip and cut 55’ drill line. August 16, 2013: Slip and cut 55’ of drill line. Rig service; greased TD, DW, blocks, swivel; checked oil in DW, gens, and MP. TIH from 9015’ to 10000’. TIH from 10000’ to 10824’. Drill from 10824’ to 11029’. Lost circulation. Build LCM pill; pump 20 BBL of LCM. Build and pump second LCM pill. TOH from 11029’ to 10967’; 2 stands of DP. Let pill soak. Fill both sides of hole with 71 BBL of mud. Build 80 lb per BBL LCM pill; drop commander ball #1; drop commander ball #2. TIH from 10967’ to 11029’; 2 stands of DP. Pump 80 lb per BBL LCM pill. TOH from 11029 to 10967’. Let 80 lb per BBL LCM pill soak; build volume. Try to fill hole with 77 BBL of mud. Build 110 lb per BBL LCM pill. Pump 22 BBL of pill and chase with 120 BBL. Wait on pill to soak. August 17, 2013; Try to fill back side with 75 BBL; no sign. Build 110 lb pr BBL LCM pill. Pump 19 BBL of 110 lb per BBL LCM pill; chase with 120 BBL; RIH 1 stand of DP. TOH 7 stands from 11029’ to 10524’/ Let LCM pill soak in formation; build mud volume and LCM pill. TIH from 10553’ to 11029’ Pump LCM pill and chase with 1300 strokes; had returns cut with oil; continue CBU; close bag; continue circulating through choke/gas buster (surface to surface = 7500 strokes). Shut down pump; closed choke monitor for pressure. TOH 19 stands. Monitor well with trip tank. Circulate surface to surface. Drop well commander ball to close up circulating sub; dropped second ball to open circulating sub. Try to open well commander @ 3300 PSI with no luck. TOH from 9824’. August 18, 2013; Continue TOH. Directional work; break apart commander sub and lay out monels. S/M with LWD and rig crew before unloading radioactive sources. Directional work; unload sources and down link MWD tool; drain motor; break off bit. P/U test joint and remove wear bushing/flush through stack and lines. Conduct BOP tests. Install wear bushing. P/U directional tools. S/M with rig crew and DD. Directional work; M/U bit motor scribe and make up MWD. S/M with LWD and rig crew for radioactive sources. Directional work; load radioactive sources and finish making up BHA and shallow test MWD. TIH from 175’. SCU 12B-09 11 August 19, 2013; Condition mud and circulate bottoms up. TIH from 10026’ to 10595’. Condition mud and circulate; wash ream tight spot at 10603’. TIH from 10594’ to 11029’. Lose returns while TIH. Drill from 11029’ to 11036’. Build and pump 23 BBL LCM pill and chase with 2229 strokes. TOH 2 stands. Let LCM pill soak; pumped 54 BBL on back side; build volume. RIH from 10880’ to 11036’. Drill from 11036’ to 11067’. TOH from 11067’ to 10877’. Pump 23 BBL of LCM pill and chase with 2200 strokes. Let LCM pill soak; build volume. Drop ball to open well commander; drop second ball to isolate BHA. Total mud loss = 784 BBL. Pump 21 BBL of 80 lb per BBL LCM pill; chase with 128 BBL. TOH from 10887’ to 10625’. Wait on LCM pill to soak into formation; build volume. Pump 40 BBL down DP and 25 BBL down backside to try to fill hole. Build 80 lb per BBL LCM pill. Pump 25 BBL of 80 lb per BBL LCM pill; chase with 128 BBL. TOH from 10954’ to 10686’. Let pill soak into formation. Pump 25 BBL down back side of hole and 45 BBL down DP; no returns. August 20, 2013; Build volume and 110 lb per BBL LCM pill. Work tight spot at 10781’. Pump 20 BBL of 110 lb per BBL LCM pill and chase with 129 BBL; pressure reached 545 PSI. Let pill soak into formation; monitor well with trip tank. Pump down back side with trip tank and down DP. Build volume and 110 lb per BBL LCM pill. Build volume and 110 lb per BBL LCM pill. Drop ball to close well commander. RIH from 10628’ to 11067’. Drill from 11067’ to 11099’. Drop ball to open well commander; drop second ball to isolate BHA. Pump 21 BBL of 110 lb per BBL LCM pill; chase with 2200 strokes. Let LCM pill soak; build volume. Rig service (function pipe rams 4 seconds). Continue to let LCM pill soak while building mud volume. Pump 22 BBL of 11 lb per BBL LCM pill; chase with 2200 strokes. Let 110 lb per BBL LCM pill soak into formation. Pump 250 BBL down backside. Build volume. August 21, 2013; Pump 75.5 BBL of 130 lb per BBL LCM pill. Received returns at 1681 strokes (97 BBL). Oil over shakers; shut in well at 5300 units of gas read; Max gas 6460 units; record pressures; circulate through choke. Circulate B/U. Monitor well. TOH 5 stands. Circulate gas out. Drop ball to close well commander. Troubleshoot MWD tool. TOH from 10664’ to 9765’. Troubleshoot MWD tool. TIH from 9767’ to 11099’; bridge at 11004’; lost circulation and returns. Build 3 120 lb per BBL LCM pill; monitor well from trip tank; pumped 50 BBL on backside with no returns. Dropped ball #1; pressured up to 1183 PSI. Dropped ball #2; pressured up to 1583 PSI. Pump 47.7 BBL of 120 lb per BBL LCM pill; chase with 127.5 BBL. August 22, 2013; Pump 47.7 BBL of 120PPB LCM pill and chase with 127.5 BBL spot pill @ 10986'. Service rig and let pill soak into formation. Pump 17 BBL down back side with no returns. Build volume and 130 PPB lcm pill. RIH from 9764' to 11064'. Drop ball to close well commander. Drill from 11099' to 11161'. Monitor well and build LCM pills. Drop ball to open well commander and drop second ball to isolate BHA. Pump 60 BBL of 130 PPB LCM pill and chase with 2200 strokes. TOOH from 11086' to 9766'. Let LCM pill soak into formation. TIH from 9766' to 11161'. Start drilling from 11161'. August 23, 2013; Drilling ahead from 11161' to 11400' MD, circulate bottoms up, trip out of hole from 11400' to 10788', pump 100 BBL down backside, trip out of hole from 11788' to 9773', service rig and monitor well, slip and cut 156' of drill line, continue to service rig, fill back side with 200 BBL, trip out of hole from 9767' to 2606', fill backside with 450 BBL with no returns, trip out of hole and lay down bha and mwd tools. August 24, 2013; Pull wear bushing, install test plug and make up test equipment, test annular and choke to 250psi and 2500psi, rig down test plug and test joint, install wear bushing, pick up tools-scribe motor and load data, run in hole to 11020', wash and ream from 11020' to 11069' and circulate out gas and oil, shut in well due to gas and oil and monitor pressure through choke, open well and pull 3 stands to get out of tight hole, shut in well and circulate through choke. Max gas last 24 hours 1193 units @ 11069'. SCU 12B-09 12 August 25, 2013; Pull out of hole to 10879, shut in well and circulate through choke, shut in well and monitor pressure up to 40psi and circulate through choke, circulate bottoms up and monitor well for gas, shut in well and circulate surface to surface through choke, drop ball to open well commander and second ball to isolate BHA, run in hole 2 stands, pump 65 BBL 100 lbs/BBL LCM and chase with 2110 strokes, pull out of hole from 11006' to 9769', fill hole to monitor well with 10 BBL every half hour pumped 75 BBL down back side with no returns and continued to monitor well, pull out of hole from 9776' to 4968', monitored well for gas, pull out of hole from 4968' to 5984' at report time. Max gas last 24 hours 5172 units circulating @ 10877'. August 26, 2013; Pull out of hole from 5984' to 4968', monitor well for gas, pull out of hole from 4968' to 2155', monitor well for gas, pull out of hole from 6155' to 200', lay down BHA and unload data sources, remove wear bushing, install test plug, test BOP's, lay down test joint and fill stack with water, rig up to test blind rams, do draw down test on accumulator, pull test plug and install wear bushing, blow down choke manifold and line up for hard shut in, service rig, making up BHA at report time. Max gas last 24 hours 240 units. August 27, 2013; Trip in hole to 10170', circulate gas out through choke, shut in well and monitor casing pressure, open well and circulate bottoms up, wash and ream from 10169' to 10390' taking 15Klbs WOB, work free and circulate, trip out of hole to 10136' and circulate, wash and ream from 10166' to 10634' at report time. Max gas last 24 hours 2347 units. August 28, 2013; Wash and ream to 10768’, lost returns @ 10768’, build 75BBL 100lb/BBL LCM pill, drop ball to open well commander and second ball to isolate BHA, pump 75 BBL LCM pill, back ream from 10730’ to 10700’ and pull out of hole to 9820’, service top drive and draw works, set on pill and monitor well with trip tank (5 BBL/hr average loss), establish circulation through well commander and drop ball to close well commander, circulate through bit to confirm circulation, drop ball to open well commander, trip in hole from 9820’ to 10373’, tagged bridge or ledge @ 10373’, circulate ream pump sweep and wash on top of trouble spot, wash and ream from 10373’ to 10650’ at report time. Max gas last 24 hours 1463 units @ 10630’. August 29, 2013; Wash and ream from 10630’ to 10690’, lost circulation @ 10690’ condition mud and build 75 lb/BBL LCM pill drop ball to close well commander and isolate BHA, pump LCM pill, Pull up from 10703’ to inside shoe @ 9768’, condition mud and circulate to keep hole full, monitor well and open well commander, work pipe @ 9815’ and try to unplug well commander, service rig and top drive, fill and monitor well for 1 hour and refill annulus with 147 BBL, build LCM pill and pump down back side, pull out of hole from 9815’ to 9489’ dry, pump down drill pipe and establish circulation through well commander, fill hole and monitor well at rotary table, trip in hole from 9489’ to 10383’, condition mud and circulate, break circulation while filling backside, pump 70 BBL LCM slug, pull 19 stands and let LCM soak, cut and slip drill line, condition mud and circulate to clear LCM from string and close well commander, monitoring well at 9470’ at report time. Max gas last 24 hours 169 units @ 10690’. August 30, 2013; Monitor well @9470’, rig up test pump to shear well commander closing sleeve and pressured up to 4850 psi, rig down test pump, pull out of hole from 9380’ to 96’, lay down directional tools (directional tools packed off with LCM and cuttings, change bit service rig make up pick up and test MWD and directional tools, trip in hole to 6960’, service rig and continue to trip in hole to 8823’ at report time. Max gas last 24 hours 75 units @ 9470’. SCU 12B-09 13 August 31, 2013; Trip in hole from 8823’ to 9449’, change pop off valve on pump #2, run in hole from 9449’ to 10268’, service rig, run in hole to 10328’ and started taking weight, wash and ream from 10328’ to 10610’, pump sweeps and circulate until hole is clean, pump 45 BBL pill and displace out of pipe, pull out of hole from 10610’ to 9792’, check flow, pull out of hole from 9792’ to 2578’ at report time. Max gas last 24 hours 521 units @ 10006’. September 1, 2013; Pull out of hole from 2578’ to surface and lay down BHA, check upper pipe rams remove wear bushing and test lower pipe rams, install wear bushing, rig up casing equipment, pick up shoe track make up packers and trip in hole with casing to 967’, make up liner hanger with wiper rubber attached, rig down casing tools trip in hole 1000’ to 9122’ at report time. Max gas last 24 hours 53 units @ 9122’. SCU 12B-09 14 3 GEOLOGICAL DATA 3.1 Lithostratigraphy All tops were provided by Hilcorp geologist Kevin Eastham. PROGNOSED OBSERVED FORMATION MD (ft) TVD (ft) SSTVD (ft) MD (ft) TVD (ft) SSTVD (ft) Kick Off Point 9148 -9010 9831 9823 -9679 Tyonek G-1 10173 10134 -9990 Tyonek G2 10128 -9990 10225 10169 -10025 HKT 10216 -10078 10380 10250 -10106 Hemlock H2 10462 10280 -10136 Hemlock H3ST 10507 10306 -10162 Hemlock H4ST 10317 -10179 10597 10342 -10198 Hemlock H5ST 10646 10359 -10215 Hemlock H7ST 10390 -10252 10739 10389 -10245 Hemlock H10 10517 -10379 11246 10513 -10369 Hemlock H12 10668 -10530 TD 10806 -10668 11412 10535 -10391 SCU 12B-09 15 3.2 Lithologic Details Tuffaceous Sand, Loose Sand (9840' - 9930') = 40-60% loose quartz sand and very light gray to grayish white ashy/ tuffaceous sandstone; upper fine grain, occasional lower medium and lower fine grain; subrounded; subdiscoidal; moderate to well sorted; poorly consolidated in very ashy/ weathered tuffaceous matrix; dominantly a sublithic arenite, locally a lithic arenite, rarely grain supported noncalcareous; generally whitish gray translucent quartz with occasional glass-like transparent volcanic glass clasts; trace mafic minerals, greenstone at top of interval; dark gray to grayish black lithics increase to 30% of sample down section; note occasional pebble fragments; note earthy organics, carbonaceous shale, lithic coal; NSOFC. Sand, Tuffaceous Sand (9930' - 10000') = 40-60% loose sand; tuffaceous sandstone is very light gray to light gray, grayish white; upper fine to lower fine grain; subrounded; subdiscoidal; well to moderate sorting; very soft to friable in part; generally matrix supported with weathered tuff/ ash matrix; note decreased translucent and transparent quartz, increased dark gray to grayish black lithics; note occasional grain supported sandstone; NSOFC. Tuffaceous Sandstone, Tuffaceous Siltstone (10000' - 10070') = very light gray to white with light gray hues; very fine to coarse grain; moderate sphericity; subrounded to subangular; very poorly to poorly sorted; poorly consolidated; generally 40-60% ash matrix supported, with translucent to opaque white to dark gray quartz; occasional trace black lithics and minor conglomerate; increase in tuff at bottom of interval; NSOFC. Tuffaceous Sandstone (10070' - 10120') = moderate gray to light gray with yellowish gray hues; upper very fine to lower medium grain; subrounded to subangular; poorly consolidated; 50-60% clayey/ ashy matrix; 30- 40% translucent and opaque quartz; trace black lithics and minor conglomerate sand/conglomerate; loose sand increases at bottom of interval. Tuffaceous Sandstone (10120' - 10160') = very light gray to light gray; medium to fine grain; subangular; poorly to moderately sorted; very poorly consolidated; 20-30% loose sand; minor conglomerate sand; NSOFC. Tuffaceous Sandstone, Tuffaceous Siltstone, Carbonaceous Shale (10160' - 10260') = light gray to very light gray; very fine to upper medium grain; subrounded to subangular; moderately sorted; poorly consolidated; 60-70% ash matrix supported; tuffaceous siltstone is medium gray to light gray; soft; pulverulent tenacity; massive cuttings habits; silty to gritty; punky consistency; carbonaceous shale is brownish gray to brownish black and interbedded from 10200' - 10220'; moderate outgassing; NO VISIBLE OIL STAIN; SLIGHT TO MODERATE ODOR; 75-90% BRIGHT YELLOW SAMPLE FLUORESCENCE; IMMEDIATE BRIGHT YELLOW TO MILKY WHITE FLUORESCENCE CUT; BRIGHT TO MODERATE YELLOW FLUORESCENCT RING; NO VISUAL RESIDUE. Sand, Conglomerate Sand (10260' - 10360') = light gray to grayish white, translucent and transparent quartz grains; upper fine to lower coarse grain; subdiscoidal; subrounded to angular; unconsolidated; no matrix; compositionally mature; 95% quartz; trace to minor tuffaceous sandstone and conglomerate; sand dominates bottom of interval; NO VISIBLE OIL STAIN; VERY SLIGHT TO SLIGHT ODOR; 85% SAMPLE FLUORESCENCE; MODERATE TO IMMEDIATE YELLOW MILKY CUT FLUORESCENCE; MODERATE TO BRIGHT YELLOW FLUORESCENT RING; NO VISUAL RESIDUE. Tuffaceous Siltstone (10360' - 10430') = medium light gray to light gray with medium gray hues; soft; poorly indurated; stiff to pasty; wedge like cuttings habit; smooth to silty; waxy to greasy; minor tuff with trace carbonaceous shale; claystone appears near end of interval; signs of good oil show increase as sand content increases in interval; NO ODOR; NO VISIBLE OIL STAIN; 40-80% SAMPLE FLUORESCENCE; MODERATE TO IMMEDIATE YELLOW TO YELLOW MILKY CUT FLUORESCENCE; MODERATE YELLOW FLUORESCENT RING; NO VISUAL RESIDUE. SCU 12B-09 16 Tuffaceous Claystone, Tuffaceous Sandstone (10430' - 10568') = very light gray, grayish white, light gray in part; very fine grain; subrounded to rounded; subdiscoidal; well sorted; up to 15% loose quartz sand; balance varies from an 'ash-stone' with varying amounts of well indurated quartz from 10-80%; non- calcareous; NO STAIN OR ODOR; 40-90% BRIGHT YELLOW, BECOMING ORANGE TO YELLOW ORANGE FLUORESCENCE AT THE BASE OF THE INTERVAL; IMMEDIATE MILKY TO WHITE BURST CUT WITH OCCASIONAL STRONG STREAMING; BRIGHT MILKY FLUORESCENT RING; NO VISIBLE RESIDUE; BASE OF UNIT HAS NO VISIBLE SOLVENT REACTON OR CUT; MILKY TO LIGHT YELLOW FLUORESCENT RESIDUE RING; NO VISIBLE RESIDUE. Tuffaceous Sand, Conglomeratic Sand, Tuff, Tuffaceous Claystone (10610' - 10740') = light gray to grayish white, becoming light olive gray, increasing brownish hues; very fine to lower fine grain; subrounded to rounded; subdiscoidal; well sorted in part; generally well indurated within ashy/ weathered tuff matrix; note localized grain supported quartz sandstone with good visual porosity; note well developed coal at 10680'; FREE OIL AT POSSUM BELLY WELL MIXED WITH DRILLING FLUID; MODERATE HYDROCARBON ODOR AT THE PITS; DRILLING MUD FLUORESCES BRIGHT YELLOW; NO VISIBLE STAIN; 30-100% YELLOW TO ORANGE CUTTING FLUORESCENCE; IMMEDIATE BUT BARELY PERCEPTIBLE CLEAR TO VERY LIGHT WHITE CUT WITH OCCASIONAL VERY LIGHT WHITE TO MILKY STREAM; BARELY VISIBLE VERY LIGHT WHITE FLUORESCENT RING; NO VISIBLE RESIDUE. Tuffaceous Siltstone, Tuff, Sand, Sandstone (10750' - 10810') = siltstone is medium dark gray to brownish gray; friable; moderately indurated; dense to brittle; massive cuttings habit; gritty; some with coal laminations; 90% grain supported; white tuff has thin gray laminations and very fine quartz grains in part; note trace grain supported sandstone; note trace sand; FREE OIL IN MUD; NO ODOR; 30-90% BRIGHT YELLOW SAMPLE FLUORESCENCE; FAST TO IMMEDIATE MODERATE YELLOW TO BRIGHT YELLOW MILKY FLUORESCENT CUT; MODERATE TO STRONG FLUORESCENT RING; NO VISIBLE RESIDUE. Conglomeratic Sand, Loose Sand, Pebble Fragments (10810' - 10920') = dominantly unconsolidated/ disconsolidated sand and pebble fragments; upper fine to lower medium, occasionally upper medium grain; subangular to subrounded; subprismoidal to subdiscoidal; fair to moderate sorting; locally abundant well rounded subprismoidal pebble fragments with fresh high impact fracture; 60-80% grayish white, translucent, rare transparent quartz; grayish black to dark gray lithics common, occasional reddish orange mafic minerals, trace greenstone; NO VISIBLE OIL STAIN; VERY SLIGHT ODOR; 20% BRIGHT YELLOW, 50% AND GREATER DULL ORANGE FLUORESCENCE EVENLY DISTRIBUTED THROUGHOUT SAMPLES; IMMEDIATE BRIGHTENING WITH VERY LIGHT WHITE FLUORESCENT CUT; VERY FAST MILKY WHITE STREAMERS; MODERATE TO STRONG MILKY FLUORESCENT RING; NO VISIBLE RESIDUE. Conglomeratic Sand, Loose Sand, Ash/Tuff 10920' - 11017') = 80-90% loose sand, 20-10% ash/ weathered tuff; upper fine to lower medium grain; subangular to subrounded; subdiscoidal to subprismoidal; occasional well rounded subprismoidal pebble fragments with high impact fractured surfaces; ash/ weathered tuff is white to grayish white with very little clastic component; NO STAIN; LIGHT ODOR; 90% DULL ORANGE/ 10% BRIGHT YELLOW FLUORESCENCE; WATER IN PROCESSED SAMPLES FLUORESCES; IMMEDIATE BRIGHTENING WITH BURST OF FLUORESCENT WHITE WHICH DISSIPAITES QUICKLY; BRIGHT WHITE FLUORESCENT RING; NO VISISBLE RESIDUE. SCU 12B-09 17 3.3 Connection Gases 50 units = 1% Methane Equivalent Measured Depth (feet) Subsea Total Vertical Depth (feet) Gas over background (units) Measured Depth (feet) Subsea Total Vertical Depth (feet) Gas over background (units) 10067 -9906 32 10715 -10238 14 10131 -9959 8 10778 -10257 18 10255 -10045 8 10872 -10280 26 10384 -10109 62 10936 -10294 22 10445 -10135 50 3.4 Trip Gases 50 units = 1% Methane Equivalent Measured Depth (feet) Subsea Total Vertical Depth (feet) Trip to (feet) Maximum Gas (Units) Pumps Off Time (hours) 10001 -9846 Surface Bit Trip 47 23 10168 -9986 Surface Bit Trip 3863 39.1 10193 -10004 Surface Bit Trip 521 48.1 10416 -10123 Surface Bit Trip 2347 50.8 10509 -10162 Surface Bit Trip 624 35.2 10541 -10176 Surface Bit Trip 1757 54.5 10558 -10183 Surface Bit Trip 544 24.8 10824 -10269 Surface Bit Trip 237 27.1 11029 -10313 10524 6668 13.5 11099 -10327 10664 6460 25.5 10879 -10282 Surface Bit Trip 5172 37.5 SCU 12B-09 18 3.5 Sampling Program / Sample Dispatch Set Type / Purpose Frequency* Interval Dispatched to A Washed and dried reference samples 30 ft 10 ft 9840 ft – 9990 ft 9990 ft – 11020 ft Hilcorp Alaska LLC 3800 Centerpoint Drive Suite #100 Anchorage AK 99503 Attn.: Debra Oudean (907) 777-8337 B Washed and dried reference samples 30 ft 10 ft 9840 ft – 9990 ft 9990 ft – 11020 ft Hilcorp Alaska LLC 3800 Centerpoint Drive Suite #100 Anchorage AK 99503 Attn.: Debra Oudean (907) 777-8337 C Wet unprocessed samples for Canrig Quality Control analysis 10 ft 9990 ft – 11020 ft Canrig Drilling Technology 1615 Jefferson Island Road New Iberia LA 70560 Attn.: Geoff Davison (337) 380-5298 D Drilling Mud Samples samples for Canrig Quality Control analysis 50 ft 9990 ft – 11020 ft Canrig Drilling Technology 1615 Jefferson Island Road New Iberia LA 70560 Attn.: Geoff Davison (337) 380-5298 • Sample frequency may be locally altered according to drill rate constraints and zones of interest. SCU 12B-09 19 4 DRILLING DATA 4.1 Directional Survey Data Measured Depth (ft) Inc. (o) Azi. (o) True Vertical Depth (ft) Northing (ft) Easting (ft) Vertical Section (ft) Dogleg Rate (o/100ft) 0 0 293.4 0 0 0 0 0 17.5 0 293.4 17.5 0 0 0 0 100 0.48 293.4 100 0.14 -0.32 0.31 0.58 200 0.45 300.14 200 0.50 -1.04 1.06 0.06 300 0.32 276.45 299.99 0.73 -1.66 1.63 0.20 400 0.33 259.22 399.99 0.71 -2.22 1.98 0.10 500 0.31 241.43 499.99 0.52 -2.74 2.18 0.10 600 0.23 213.65 599.99 0.23 -3.09 2.18 0.15 700 0.18 198.67 699.99 -0.09 -3.25 2.04 0.07 800 0.17 182.47 799.99 -0.39 -3.31 1.86 0.05 900 0.19 164.82 899.99 -0.69 -3.27 1.60 0.06 1000 0.06 154.37 999.99 -0.90 -3.20 1.40 0.13 1100 0.06 243.94 1099.99 -0.97 -3.23 1.36 0.08 1200 0.06 232.82 1199.99 -1.03 -3.32 1.38 0.01 1300 0.14 250.31 1299.99 -1.10 -3.47 1.42 0.08 1400 0.28 264.64 1399.99 -1.16 -3.83 1.61 0.15 1500 0.30 255.74 1499.99 -1.25 -4.33 1.86 0.05 1600 0.33 257.62 1599.98 -1.38 -4.86 2.11 0.03 1700 0.33 254.55 1699.98 -1.51 -5.42 2.37 0.02 1800 0.33 256.32 1799.98 -1.66 -5.98 2.63 0.01 1900 0.36 255.33 1899.98 -1.81 -6.56 2.89 0.03 2000 0.32 189.19 1999.98 -2.16 -6.91 2.85 0.37 2100 0.48 156.56 2099.97 -2.82 -6.79 2.27 0.27 2200 0.22 228.36 2199.97 -3.33 -6.77 1.86 0.46 2300 0.46 265.69 2299.97 -3.49 -7.31 2.10 0.31 2400 0.60 269.97 2399.97 -3.52 -8.23 2.67 0.15 2500 1.07 263.12 2499.96 -3.63 -9.68 3.53 0.48 2600 1.32 256.29 2599.93 -4.02 -11.73 4.57 0.29 2700 1.38 259.76 2699.91 -4.51 -14.03 5.70 0.10 2800 2.02 254.19 2799.86 -5.20 -16.92 7.04 0.66 2900 2.28 260.02 2899.79 -6.03 -20.57 8.79 0.34 3000 2.71 269.46 2999.70 -6.39 -24.89 11.32 0.59 3100 2.85 270.18 3099.58 -6.41 -29.74 14.46 0.14 3200 3.17 268.83 3199.44 -6.46 -34.99 17.84 0.33 3300 3.53 270.81 3299.27 -6.47 -40.84 21.63 0.38 3400 4.22 275.83 3399.04 -6.05 -47.57 26.32 0.77 3500 4.43 275.88 3498.76 -5.28 -55.08 31.78 0.21 3600 4.18 281.06 3598.48 -4.19 -62.50 37.44 0.46 SCU 12B-09 20 Surveys (Continued) Measured Depth (ft) Inc. (o) Azi. (o) True Vertical Depth (ft) Northing (ft) Easting (ft) Vertical Section (ft) Dogleg Rate (o/100ft) 3700 3.75 289.2 3698.24 -2.41 -69.16 43.12 0.71 3800 3.75 296.24 3798.02 0.11 -75.18 48.95 0.46 3900 4.05 301.72 3897.79 3.41 -81.12 55.32 0.48 4000 4.25 303.27 3997.53 7.30 -87.22 62.24 0.23 4100 4.37 306.23 4097.25 11.58 -93.39 69.51 0.25 4200 4.24 308.45 4196.96 16.14 -99.36 76.84 0.21 4300 3.83 312.66 4296.72 20.70 -104.71 83.79 0.51 4400 3.50 310.25 4396.51 24.93 -109.50 90.12 0.36 4500 3.32 307.89 4496.33 28.68 -114.11 95.97 0.23 4600 3.24 306.27 4596.17 32.13 -118.68 101.56 0.12 4700 2.93 305.87 4696.03 35.30 -123.03 106.79 0.31 4800 2.42 301.19 4795.92 37.89 -126.90 111.28 0.55 4900 2.22 301.87 4895.83 40.01 -130.35 115.13 0.20 5000 1.99 308.06 4995.77 42.10 -133.37 118.68 0.32 5100 1.93 310.45 5095.71 44.27 -136.01 122.04 0.10 5200 1.95 313.09 5195.65 46.52 -138.54 125.40 0.09 5300 1.81 326.87 5295.60 49.01 -140.64 128.66 0.47 5400 1.74 332.95 5395.55 51.68 -142.20 131.70 0.20 5500 1.72 335.04 5495.50 54.39 -143.52 134.62 0.07 5600 1.71 339.98 5595.46 57.16 -144.67 137.46 0.15 5700 1.64 345.10 5695.42 59.94 -145.54 140.15 0.17 5800 1.67 347.18 5795.38 62.74 -146.24 142.73 0.07 5900 1.59 338.01 5895.34 65.45 -147.08 145.34 0.27 6000 1.52 332.45 5995.30 67.91 -148.21 147.94 0.17 6100 1.60 308.78 6095.26 69.96 -149.91 150.61 0.64 6200 1.90 309.79 6195.22 71.90 -152.27 153.61 0.30 6300 2.09 309.60 6295.16 74.12 -154.95 157.04 0.19 6400 3.62 312.39 6395.03 77.41 -158.69 161.97 1.54 6500 3.62 312.32 6494.83 81.67 -163.36 168.24 0.00 6600 4.03 328.10 6594.61 86.78 -167.55 174.85 1.13 6700 4.13 331.49 6694.36 92.92 -171.12 181.84 0.26 6800 4.05 332.54 6794.10 99.22 -174.47 188.80 0.11 6900 3.54 330.76 6893.88 105.05 -177.61 195.27 0.52 7000 2.95 325.16 6993.72 109.85 -180.59 200.86 0.67 7100 2.42 317.70 7093.61 113.53 -183.48 205.53 0.63 7200 2.44 317.12 7193.52 116.65 -186.35 209.77 0.03 7300 2.49 318.47 7293.43 119.84 -189.23 214.07 0.08 7400 2.50 320.56 7393.33 123.15 -192.06 218.42 0.09 7500 2.55 321.57 7493.24 126.57 -194.83 222.82 0.07 7600 2.46 325.07 7593.14 130.07 -197.44 227.18 0.18 7700 2.06 323.71 7693.06 133.28 -199.73 231.11 0.40 SCU 12B-09 21 Surveys (Continued) Measured Depth (ft) Inc. (o) Azi. (o) True Vertical Depth (ft) Northing (ft) Easting (ft) Vertical Section (ft) Dogleg Rate (o/100ft) 7800 1.72 319.61 7793.01 135.87 -201.77 234.40 0.37 7900 1.51 329.07 7892.97 138.15 -203.42 237.20 0.34 8000 1.50 337.69 7992.93 140.49 -204.59 239.74 0.23 8100 1.27 342.29 8092.90 142.76 -205.43 242.01 0.26 8200 1.23 332.61 8192.88 144.76 -206.26 244.08 0.21 8300 1.33 333.88 8292.86 146.76 -207.26 246.24 0.10 8400 1.41 333.74 8392.83 148.90 -208.32 248.56 0.08 8500 1.50 333.82 8492.8 151.18 -209.44 251.02 0.09 8600 1.33 328.19 8592.76 153.34 -210.63 253.44 0.22 8700 1.19 309.44 8692.74 154.99 -212.04 255.61 0.43 8800 1.21 312.08 8792.72 156.36 -213.63 257.68 0.06 8900 1.32 325.34 8892.70 158.01 -215.07 259.87 0.31 9000 1.47 329.45 8992.67 160.06 -216.37 262.28 0.18 9100 1.35 336.00 9092.64 162.24 -217.50 264.67 0.20 9200 1.23 338.26 9192.61 164.32 -218.38 266.81 0.13 9300 1.41 342.1 9292.58 166.49 -219.16 268.97 0.20 9400 1.37 334.25 9392.55 168.73 -220.05 271.26 0.19 9500 1.05 324.64 9492.53 170.56 -221.10 273.33 0.38 9600 0.94 315.15 9592.52 171.89 -222.21 275.06 0.20 9700 1.00 307.86 9692.50 173.00 -223.48 276.73 0.14 9760 1.34 295.07 9752.49 173.62 -224.53 277.88 0.71 ti 9813.65 1.00 292.00 9806.13 174.06 -225.53 278.87 0.64 9830 1.05 289.93 9822.48 174.17 -225.80 279.13 0.39 9856 4.51 299.71 9848.44 174.76 -226.92 280.30 13.38 9888 7.53 300.97 9880.26 176.46 -229.81 283.47 9.45 9903 8.79 308.30 9895.11 177.67 -231.55 285.53 10.88 9940 11.65 320.15 9931.52 182.30 -236.16 292.04 9.56 9990 17.74 320.33 9979.86 192.04 -244.27 304.71 12.18 10014 21.46 318.57 10002.47 198.15 -249.51 312.76 15.69 10053 27.97 319.12 10037.88 210.43 -260.23 329.06 16.7 10077 31.53 321.75 10058.71 219.62 -267.80 340.96 15.8 10112 36.75 321.24 10087.67 234.98 -280.03 360.58 14.94 10141 39.67 321.02 10110.46 248.94 -291.29 378.51 10.08 10175 44.90 319.76 10135.60 266.55 -305.87 401.38 15.58 10204 47.44 319.39 10155.68 282.47 -319.44 422.30 8.81 10241 50.51 319.95 10179.97 303.75 -337.50 450.20 8.38 10267 53.15 321.70 10196.03 319.60 -350.41 470.64 11.45 10302 58.47 321.02 10215.69 342.20 -368.48 499.56 15.28 10331 62.77 320.22 10229.92 361.73 -384.51 524.82 15.02 10349 64.18 319.55 10237.96 374.04 -394.89 540.92 8.51 10412 64.89 320.45 10265.04 417.62 -431.45 597.80 1.71 SCU 12B-09 22 Surveys (Continued) Measured Depth (ft) Inc. (o) Azi. (o) True Vertical Depth (ft) Northing (ft) Easting (ft) Vertical Section (ft) Dogleg Rate (o/100ft) 10453 64.80 321.09 10282.47 446.36 -454.92 634.90 1.43 10475 64.73 321.75 10291.85 461.92 -467.33 654.79 2.73 10507 64.77 320.83 10305.50 484.50 -485.43 683.72 2.60 10537 64.88 321.53 10318.26 505.66 -502.45 710.86 2.14 10602 68.99 324.03 10343.73 553.28 -538.60 770.54 7.25 10662 69.97 325.09 10364.76 599.06 -571.18 826.51 2.32 10725 72.06 324.80 10385.25 647.82 -605.39 885.81 3.35 10787 73.65 326.84 10403.53 696.83 -638.67 944.68 4.06 10851 77.08 325.30 10419.70 748.20 -673.23 1006.18 5.84 10914 78.21 325.76 10433.18 798.93 -708.06 1067.38 1.93 10453 64.80 321.09 10282.47 446.36 -454.92 634.90 1.43 10475 64.73 321.75 10291.85 461.92 -467.33 654.79 2.73 10507 64.77 320.83 10305.50 484.50 -485.43 683.72 2.60 10537 64.88 321.53 10318.26 505.66 -502.45 710.86 2.14 10602 68.99 324.03 10343.73 553.28 -538.60 770.54 7.25 10662 69.97 325.09 10364.76 599.06 -571.18 826.51 2.32 10725 72.06 324.80 10385.25 647.82 -605.39 885.81 3.35 10787 73.65 326.84 10403.53 696.83 -638.67 944.68 4.06 10851 77.08 325.30 10419.70 748.20 -673.23 1006.18 5.84 10914 78.21 325.76 10433.18 798.93 -708.06 1067.38 1.93 SC U 1 2 B - 0 9 23 4. 2 B i t R e c o r d Bi t S i z e M a k e Ty p e SN Je t s TF A De p t h In De p t h Ou t Fo o t a g e Dr i l l e d Bi t Ho u r s Av g . RO P (f t / h r ) Av g . WO B (kl b s ) Av g . RP M Av g . PP (p s i ) Grade 1 6 ” H C C ST X - 1 52 2 4 8 9 7 3x 2 0 0. 9 2 0 4 98 3 1 9 8 4 3 1 2 0 . 2 6 4 . 9 1 2 . 3 4 4 . 4 1 8 6 8 1 - 1 - A - I - N - S E - B H A 2 6 ” H C C MX - 1 8 H D X 52 1 7 2 2 4 3X 1 4 0. 4 5 1 0 98 4 3 1 0 0 0 1 1 5 8 7 . 7 3 3 . 2 1 4 . 3 0 . 3 1 9 8 6 2R R 6 ” H C C MX - 1 8 H D X 52 1 7 2 2 4 3x 1 4 0. 4 5 1 0 10 0 0 1 1 0 5 0 9 5 0 8 2 4 . 7 7 0 . 6 1 8 . 1 1 5 . 4 18 0 3 6 - 6 - W T - A - E - I - E R - H R 3 6 ” HC C #5 DP 5 0 5 F X 71 3 7 5 7 0 5x 1 1 0. 4 6 4 0 10 5 0 9 1 0 5 6 9 2 2 0 4 . 0 4 0 . 5 7 . 5 2 4 . 1 16 5 2 1 - 1 - W T - A - X - I - B T - B H A 4 6 ” HC C #6 MX - 1 8 H D X 52 1 7 2 2 5 3x 1 4 0. 4 5 1 0 10 5 6 9 1 0 8 2 4 2 5 5 1 4 . 3 2 5 . 3 1 6 . 9 2 8 . 8 17 9 8 1 - 1 - W T - A - E - I - E R - D T F 5 6 ” HC C #7 MX - 1 8 H D X 52 1 7 1 7 7 3x 1 4 0. 4 5 1 0 10 8 2 4 1 1 0 2 9 2 0 5 6 . 7 4 3 . 6 1 9 . 5 4 5 . 7 2 1 8 1 1 - 1 - W T - A - E - I 6 6 ” HC C #8 DP 5 0 5 F X 70 3 4 9 6 5 5x 1 1 0. 4 6 4 0 11 0 2 9 1 1 4 1 2 3 7 1 ’ 2 . 4 5 2 7 9 . 7 8 . 7 5 0 . 1 1 8 2 0 6R R 1 6 ” HC C #8 DP 5 0 5 F X 70 3 4 9 6 5 5x 1 1 0. 4 6 4 0 11 4 1 2 1 1 4 1 2 0 0 0 0 0 0 1 - 1 - W T - A - X - I - B T - B H A 7R R 1 6 ” HC C #7 MX - 1 8 H D X 52 1 7 1 7 7 3x 1 4 0. 4 5 1 0 11 4 1 2 1 1 4 1 2 0 0 0 0 0 0 1 - 1 - W T - A - E - I 3R R 2 6 ” H C C ST X - 1 52 2 4 8 9 7 3x 2 0 0. 9 2 0 4 11 4 1 2 1 1 4 1 2 0 0 0 0 0 0 1 - 1 - N O - A - 1 - I - N O - B H A SC U 1 2 B - 0 9 24 4. 3 Mu d R e c o r d Co n t r a c t o r : B a r o i d Mu d T y p e : E Z M u d 6 % K C l Da t e De p t h (f t ) MW (p p g ) VI S (s / q t ) PV Y P G e l s FL (c c ) So l s (% ) O/ W Ra t i o Sd (% ) MB T (p p b eq . ) pH Al k (P m ) Cl (mg/L) Ca (mg/L) 07 / 1 3 / 2 0 1 3 9 8 5 0 1 0 . 3 0 5 4 1 4 1 9 6 / 7 / 8 4 . 1 7 . 0 0 . 0 / 9 0 . 2 - 1 . 0 9 . 4 0 . 4 0 3 5 0 0 0 2 0 0 07 / 1 4 / 2 0 1 3 9 8 5 0 1 0 . 5 0 5 2 1 3 1 7 4 / 5 / 6 3 . 6 7 . 5 0 . 0 / 8 9 . 6 - 1 . 0 8 . 9 0 . 2 0 3 6 5 0 0 8 0 07 / 1 5 / 2 0 1 3 9 8 5 0 1 0 . 4 0 4 9 1 1 1 5 4 / 5 / 6 3 . 9 7 . 1 0 . 0 / 9 0 . 1 - 1 . 0 8 . 9 0 . 2 0 3 5 0 0 0 8 0 07 / 1 6 / 2 0 1 3 9 8 5 3 1 0 . 5 0 4 7 1 3 1 8 5 / 6 / 7 4 . 1 7 . 7 0 . 0 / 8 9 . 8 - 1 . 0 9 . 0 0 . 2 0 3 2 0 0 0 2 0 0 07 / 1 7 / 2 0 1 3 9 8 7 0 1 0 . 5 0 5 3 8 2 5 5 / 6 / 7 4 . 0 7 . 7 0 . 0 / 8 9 . 8 - 1 . 0 9 . 2 0 . 3 8 3 2 0 0 0 1 4 0 07 / 1 8 / 2 0 1 3 9 8 7 0 1 0 . 5 8 5 9 1 3 2 1 5 / 6 / 7 4 . 0 8 . 1 0 . 0 / 8 9 . 4 - 1 . 0 8 . 9 0 . 2 0 3 2 0 0 0 1 4 0 07 / 1 9 / 2 0 1 3 9 8 7 0 1 0 . 5 0 4 9 1 1 1 7 5 / 6 / 7 4 . 0 7 . 9 0 . 0 / 8 9 . 8 - 1 . 0 9 . 0 0 . 2 5 3 0 0 0 0 1 4 0 07 / 2 0 / 2 0 1 3 9 8 7 0 1 0 . 6 0 5 3 1 3 1 9 5 / 6 / 7 3 . 9 8 . 1 0 . 0 / 8 9 . 5 - 1 . 0 8 . 9 0 . 2 0 3 0 5 0 0 1 6 0 07 / 2 1 / 2 0 1 3 1 0 0 8 4 1 0 . 4 3 4 9 1 5 1 9 5 / 7 / 8 3 . 8 7 . 6 0 . 0 / 9 0 . 0 - 1 . 0 9 . 4 0 . 4 0 3 1 0 0 0 1 2 0 07 / 2 2 / 2 0 1 3 1 0 1 0 2 1 0 . 4 2 4 8 1 4 1 9 5 / 6 / 7 3 . 8 7 . 5 0 . 0 / 9 0 . 1 0 . 1 0 1 . 0 9 . 8 0 . 5 5 3 1 0 0 0 1 6 0 07 / 2 3 / 2 0 1 3 1 0 2 6 3 1 0 . 4 0 4 9 1 4 2 0 5 / 6 / 7 4 . 5 7 . 4 0 . 0 / 9 0 . 2 0 . 1 0 1 . 0 9 . 3 0 . 4 5 3 1 0 0 0 1 6 0 07 / 2 4 / 2 0 1 3 1 0 2 7 1 1 0 . 1 5 5 2 1 3 1 6 5 / 6 / 7 4 . 5 6 . 5 0 . 0 / 9 1 . 0 0 . 1 0 1 . 0 9 . 3 0 . 4 5 3 1 0 0 0 1 6 0 07 / 2 5 / 2 0 1 3 1 0 2 7 1 1 0 . 2 0 5 0 1 4 1 5 5 / 6 / 7 5 . 0 6 . 7 0 . 0 / 9 0 . 8 0 . 1 0 1 . 0 8 . 2 0 . 1 0 3 2 0 0 0 1 6 0 07 / 2 6 / 2 0 1 3 1 0 2 7 1 1 0 . 2 5 6 1 1 3 1 5 5 / 6 / 7 3 . 8 6 . 6 0 . 0 / 9 0 . 8 0 . 1 0 1 . 0 8 . 0 0 . 5 0 3 3 0 0 0 2 4 0 07 / 2 7 / 2 0 1 3 1 0 2 7 1 1 0 . 2 0 4 9 1 3 1 6 6 / 7 / 8 4 . 6 6 . 5 0 . 0 / 9 1 . 0 0 . 1 0 1 . 0 8 . 9 0 . 3 0 3 2 0 0 0 2 4 0 07 / 2 8 / 2 0 1 3 1 0 2 7 1 1 0 . 2 0 5 3 1 1 1 8 7 / 8 / 9 4 . 6 6 . 5 0 . 0 / 9 1 . 0 0 . 1 0 1 . 0 8 . 9 0 . 3 0 3 2 0 0 0 4 0 0 07 / 2 9 / 2 0 1 3 1 0 2 7 1 1 0 . 2 0 4 8 1 0 1 7 6 / 7 / 8 4 . 8 6 . 6 0 . 0 / 9 1 . 0 0 . 1 0 1 . 0 8 . 9 0 . 3 0 3 0 0 0 0 2 0 0 07 / 3 0 / 2 0 1 3 1 2 0 7 1 1 0 . 2 0 4 5 1 0 1 8 6 / 7 / 8 4 . 8 6 . 6 0 . 0 / 9 1 . 0 0 . 1 0 1 . 0 1 0 . 2 0 . 3 0 3 0 0 0 0 6 0 0 07 / 3 1 / 2 0 1 3 1 0 2 7 1 1 0 . 2 5 4 8 1 2 2 3 8 / 9 / 1 0 6 . 7 6 . 4 0 . 0 / 9 1 . 0 0 . 1 0 1 . 0 1 0 . 1 2 . 1 0 3 3 0 0 0 8 0 0 08 / 0 1 / 2 0 1 3 1 0 0 2 6 1 0 . 2 5 5 2 1 5 2 4 8 / 1 0 / 1 1 5 . 6 6 . 6 0 . 0 / 9 0 . 8 - 1 . 0 9 . 7 2 . 0 0 3 3 0 0 0 8 0 0 08 / 0 2 / 2 0 1 3 1 0 0 2 6 1 0 . 3 0 5 0 1 3 2 2 8 / 1 0 / 1 2 5 . 8 7 . 0 0 . 0 / 9 0 . 6 - 1 . 0 1 0 . 3 2 . 2 0 3 0 0 0 0 5 6 0 Ab b r e v i a t i o n s MW = M u d W e i g h t V I S = F u n n e l V i s c o s i t y P V = P l a s t i c V i s c o s i t y Y P = Y i e l d P o i n t Ge l s = G e l S t r e n g t h F L = F i l t r a t e L o ss F C = F i l t e r C a k e S o l s = S o l i d s O/ W = O i l t o W a t e r r a t i o S d = S a n d c o n t e n t C l = C h l o r i d e s C a = H a r d n e s s SC U 1 2 B - 0 9 25 Co n t r a c t o r : B a r o i d Mu d T y p e : E Z M u d 6 % K C l Da t e De p t h (f t ) MW (p p g ) VI S (s / q t ) PV Y P G e l s FL (c c ) So l s (% ) O/ W Ra t i o Sd (% ) MB T (p p b eq . ) pH Al k (P m ) Cl (mg/L) Ca (mg/L) 08 / 0 3 / 2 0 1 3 1 0 0 2 6 1 0 . 3 0 4 7 1 0 2 0 6 / 8 / 1 1 7 . 0 6 . 9 0 . 0 / 9 0 . 6 - 1 . 0 1 1 . 0 2 . 5 0 3 2 0 0 0 1 6 0 0 08 / 0 4 / 2 0 1 3 9 8 3 2 1 . 0 0 4 6 1 1 1 7 6 / 8 / 1 0 8 . 4 6 . 1 0 . 0 / 9 1 . 7 - 1 . 0 1 1 . 4 3 . 0 0 2 7 5 0 0 2 4 0 0 08 / 0 5 / 2 0 1 3 9 8 4 3 9 . 9 0 4 5 1 2 1 8 5 / 7 / 9 6 . 0 5 . 5 0 . 0 / 9 2 . 0 - 1 . 0 9 . 6 0 . 6 0 3 1 0 0 0 3 2 0 0 08 / 0 6 / 2 0 1 3 1 0 0 0 1 9 . 7 0 4 6 1 1 1 6 5 / 7 / 8 5 . 8 4 . 6 0 . 0 / 9 3 . 0 - 1 . 0 8 . 7 0 . 5 0 2 9 0 0 0 3 2 0 0 08 / 0 7 / 2 0 1 3 1 0 1 4 4 9 . 7 0 4 4 1 1 1 5 5 / 6 / 7 4 . 6 4 . 9 0 . 0 / 9 2 . 7 - 1 . 0 8 . 7 1 . 5 0 3 0 0 0 0 3 4 5 0 08 / 0 8 / 2 0 1 3 1 0 4 4 0 9 . 2 5 5 0 1 2 1 6 4 / 5 / 6 3 . 8 2 . 9 0 . 0 / 9 4 . 6 - 1 . 0 9 . 5 1 . 7 0 3 0 5 0 0 2 4 0 0 08 / 0 9 / 2 0 1 3 1 0 5 0 9 9 . 2 0 4 4 9 2 0 6 / 7 / 8 3 . 9 2 . 9 0 . 0 / 9 4 . 6 - 1 . 0 9 . 2 1 . 9 5 3 0 0 0 0 2 5 6 0 08 / 1 0 / 2 0 1 3 1 0 5 0 9 9 . 2 0 4 2 1 0 1 5 4 / 5 / 6 4 . 2 3 . 0 0 . 0 / 9 4 . 6 - 1 . 0 8 . 9 1 . 9 0 2 9 5 0 0 2 4 0 0 08 / 1 1 / 2 0 1 3 1 0 5 6 9 9 . 2 0 4 3 8 2 0 5 / 7 / 8 4 . 4 3 . 1 0 . 0 / 9 4 . 5 - 1 . 0 8 . 6 1 . 0 0 2 9 0 0 0 2 6 0 0 08 / 1 2 / 2 0 1 3 1 0 5 7 0 9 . 2 5 4 0 8 1 6 4 / 5 / 6 4 . 8 3 . 4 0 . 0 / 9 4 . 2 - 1 . 0 8 . 7 1 . 3 0 2 9 5 0 0 2 4 0 0 08 / 1 3 / 2 0 1 3 1 0 5 7 0 9 . 3 5 4 1 1 2 1 6 5 / 6 / 7 4 . 9 4 . 0 0 . 0 / 9 3 . 6 - 1 . 0 8 . 7 1 . 0 0 3 0 0 0 0 2 2 0 0 08 / 1 4 / 2 0 1 3 1 0 8 2 3 9 . 3 2 3 8 9 1 9 4 / 5 / 6 5 . 0 3 . 9 0 . 0 / 9 3 . 8 - 1 . 0 8 . 4 0 . 4 0 2 8 5 0 0 2 0 0 0 08 / 1 5 / 2 0 1 3 1 0 8 2 3 9 . 4 5 4 0 8 1 6 5 / 6 / 7 4 . 7 4 . 2 0 . 0 / 9 3 . 2 - 1 . 0 8 . 6 0 . 3 0 3 1 5 0 0 2 0 0 0 08 / 1 6 / 2 0 1 3 1 1 0 2 9 9 . 2 5 3 9 7 1 7 5 / 7 / 8 4 . 9 3 . 6 0 . 0 / 9 4 . 0 - 1 . 0 8 . 7 0 . 2 5 2 9 5 0 0 2 4 0 0 08 / 1 7 / 2 0 1 3 1 1 0 2 9 9 . 1 5 4 1 8 1 5 4 / 5 / 6 4 . 5 3 . 0 4 . 0 / 9 0 . 8 - 1 . 0 8 . 2 0 . 1 0 2 7 5 0 0 2 0 0 0 08 / 1 8 / 2 0 1 3 1 1 0 2 9 9 . 2 0 4 1 7 1 6 6 / 7 / 8 4 . 8 3 . 4 1 . 0 / 9 3 . 4 - 1 . 0 8 . 9 0 . 1 6 2 7 5 0 0 1 6 0 0 08 / 1 9 / 2 0 1 3 1 1 0 6 7 9 . 1 5 4 3 7 1 7 8 / 9 / 1 0 5 . 0 3 . 1 0 . 1 / 9 4 . 5 - 1 . 0 8 . 0 0 . 5 0 2 8 0 0 0 8 0 0 08 / 2 0 / 2 0 1 3 1 1 0 9 9 9 . 2 0 5 1 1 0 1 5 6 / 7 / 8 4 . 2 3 . 1 0 . 0 / 9 4 . 5 - 1 . 0 9 . 3 0 . 4 0 2 9 5 0 0 6 0 0 08 / 2 1 / 2 0 1 3 1 1 0 9 9 8 . 9 0 5 0 1 1 1 4 7 / 9 / 1 0 4 . 7 1 . 6 2 . 0 / 9 4 . 0 - 1 . 0 8 . 1 0 . 3 0 2 9 0 0 0 2 0 0 08 / 2 2 / 2 0 1 3 1 1 1 6 1 8 . 9 0 4 9 1 2 1 2 5 / 6 / 7 5 . 0 1 . 5 0 . 0 / 9 6 . 0 - 1 . 0 8 . 5 0 . 4 0 3 0 0 0 0 2 0 0 08 / 2 3 / 2 0 1 3 1 1 4 1 2 8 . 9 0 4 2 8 1 3 6 / 9 / 1 1 7 . 4 1 . 7 0 . 0 / 9 6 . 0 - 1 . 0 8 . 2 0 . 4 0 2 8 0 0 0 2 0 0 08 / 2 4 / 2 0 1 3 1 1 4 1 2 8 . 9 0 4 2 9 1 3 6 / 8 / 1 0 5 . 9 1 . 5 0 . 0 / 9 6 . 0 - 1 . 0 8 . 8 0 . 5 0 3 0 0 0 0 1 2 0 08 / 2 5 / 2 0 1 3 1 1 4 1 2 8 . 9 0 4 5 1 0 1 6 6 / 8 / 1 1 5 . 7 1 . 6 0 . 0 / 9 6 . 0 - 1 . 0 1 0 . 5 0 . 6 0 2 9 0 0 0 8 0 08 / 2 6 / 2 0 1 3 1 1 4 1 2 8 . 9 0 4 4 1 0 1 6 6 / 9 / 1 0 6 . 2 1 . 5 0 . 0 / 9 6 . 0 - 1 . 0 9 . 9 0 . 5 0 3 0 0 0 0 8 0 Ab b r e v i a t i o n s MW = M u d W e i g h t V I S = F u n n e l V i s c o s i t y P V = P l a s t i c V i s c o s i t y Y P = Y i e l d P o i n t Ge l s = G e l S t r e n g t h F L = F i l t r a t e L o ss F C = F i l t e r C a k e S o l s = S o l i d s O/ W = O i l t o W a t e r r a t i o S d = S a n d c o n t e n t C l = C h l o r i d e s C a = H a r d n e s s SC U 1 2 B - 0 9 26 Co n t r a c t o r : B a r o i d Mu d T y p e : E Z M u d 6 % K C l Da t e De p t h (f t ) MW (p p g ) VI S (s / q t ) PV Y P G e l s FL (c c ) So l s (% ) O/ W Ra t i o Sd (% ) MB T (p p b eq . ) pH Al k (P m ) Cl (mg/L) Ca (mg/L) 08 / 2 7 / 2 0 1 3 1 1 4 1 2 8 . 9 0 4 3 1 0 1 6 6 / 9 / 1 1 6 . 0 1 . 6 0 . 0 / 9 6 . 0 - 1 . 0 8 . 9 0 . 5 0 2 9 0 0 0 8 0 08 / 2 8 / 2 0 1 3 1 1 4 1 2 8 . 9 0 4 3 1 0 1 6 7 / 8 / 9 5 . 8 1 . 5 0 . 0 / 9 6 . 0 - 1 . 0 8 . 5 0 . 5 0 3 0 0 0 0 1 2 0 08 / 2 9 / 2 0 1 3 1 1 4 1 2 8 . 9 0 4 2 9 1 7 6 / 8 / 1 0 5 . 6 1 . 5 0 . 0 / 9 6 . 0 - 1 . 0 8 . 9 0 . 4 0 3 0 0 0 0 1 2 0 08 / 3 0 / 2 0 1 3 1 1 4 1 2 8 . 4 0 2 7 - - - - - - - - 7 . 2 - - - 08 / 3 1 / 2 0 1 3 1 1 4 1 2 8 . 4 5 3 0 2 5 - - - - - - 6 . 9 - - - 09 / 0 1 / 2 0 1 3 1 1 4 1 2 8 . 4 5 3 1 2 5 - - - - - - 7 . 1 - - - Ab b r e v i a t i o n s MW = M u d W e i g h t V I S = F u n n e l V i s c o s i t y P V = P l a s t i c V i s c o s i t y Y P = Y i e l d P o i n t Ge l s = G e l S t r e n g t h F L = F i l t r a t e L o ss F C = F i l t e r C a k e S o l s = S o l i d s O/ W = O i l t o W a t e r r a t i o S d = S a n d c o n t e n t C l = C h l o r i d e s C a = H a r d n e s s SCU 12B-09 27 5 SHOW REPORTS Hydrocarbon Show Report # 1 Operator: Well: API Number: Field: Date: Rig: Time: County: Depth Start End State: 10170'MD 10370'MD Country: 10132.8'TVD 10246.4'TVD Averages Before During After Maximum ROP (fph) 62 122 24 122 WOB 27 17 22 27 RPM - 9 - 9 Mud Weight 9.50 9.35 9.20 9.50 Chloride 32,000 31,000 30,000 32,000 Total Gas C1 (ppm) 2,677 4,270 5,043 5,043 C2 (ppm) 222 632 552 632 C3 (ppm) 124 734 458 734 C4 (ppm) 55 477 258 477 C5 (ppm) 9 228 124 228 Lithology Cuttings Analysis Odor V Sli - Mod Fluorescence Cut Fluorescence Residual Cut Stain Amount 70-90% Type Mod-Imm Amount Amount None Distribution Patchy-Even Intensity Mod-Strg Color Color Intensity Strong-Mod Color Milky Residual Fluorescence Cut Color Bright Yellow Bright Intensity Color None Yellow Color Oil Show Rating 1.9 Free Oil in Mud Comments Report by: Gas peak of 215 units at start of interval; the rest of the interval has an average of 40-60 units, with peaks up to 100-120 units. No visible oil stain, very slight to moderate odor, 70-90% sample fluorescence, moderate to immediate yellow to bright yellow milky cut fluorescence, moderate to bright yellow residual ring fluorescence, no visible residue. Where oil rating is fairly low, cut fluorescence was minimal, but there was a faint residual ring fluorescence. Mike Sherry Mod-Strong Bright Yellow None Tuffaceous sandstone, sand, conglomerate sand = Tuffaceous sandstone dominates upper 100’ of interval: light gray to very light gray; very fine to upper medium grain; subrounded to subangular; moderately sorted; poorly consolidated; 60-70% ash matrix supported. Bed of carbonaceous shale, with moderate outgassing, and tuffaceous siltstone from 10200’ to 10220’. Sand and Conglomerate sand dominate lower 100’ of interval: very light gray to white translucent and transparent quartz grains; upper fine to lower coarse grain; subdiscoidal sphericity; subrounded to angular; unconsolidated; no matrix; compositionally mature; 95% quartz; trace to minor tuffaceous sandstone and conglomerate; sand dominates bottom 35’ of interval. None USA Saxon 169 0053 hrs Kenai Borough Alaska Hilcorp Alaska, LLC SCU 12B-09 50-133-10126-02-00 Swanson River 8-Aug-13 Pixler Plot 1 10 100 1000 10000 1 2 3 4 pp m DRY GAS GAS CONDENSATE OIL NON PRODUCTIVE C1/C2 C1/C4 C1/C5 C1/C3 Hydrocarbon Show Report # 2 Operator: Well: API Number: Field: Date: Rig: Time: County: Depth Start End State: 10462'MD 10560'MD Country: 10251'TVD 10377'TVD Averages Before During After Maximum ROP (fph) 23.9 26.9 11.3 172.0 WOB 15.4 4.0 13.5 37.0 RPM 17.8 37.9 3.4 55.0 Mud Weight 9.25 9.25 9.25 9.25 Chloride 30,500 30,500 30,500 30,500 Total Gas 56 28 13 72 C1 (ppm) 4,335 2,553 880 8,253 C2 (ppm) 560 192 78 636 C3 (ppm) 575 229 79 756 C4 (ppm) 390 155 52 563 C5 (ppm) 160 81 30 235 Lithology Cuttings Analysis Odor None Fluorescence Cut Fluorescence Residual Cut Stain Amount 40-90% Type Amount Amount none Distribution Even Intensity Color Color Intensity Bright Color Residual Fluorescence Cut Color Mlky-Yel Intensity Color None Color Oil Show Rating Free Oil in Mud Comments Report by: None Tuffaceous Siltstone (10360' - 10430') = medium light gray to light gray with medium gray hues; soft; poorly indurated; stiff to pasty; wedge like cuttings habit; smooth to silty; waxy to greasy; minor tuff with trace carbonaceous shale; claystone appears near end of interval; signs of good oil show increase as sand content increases in interval. Tuffaceous Claystone, Tuffaceous Sandstone (10430' - 10568') = very light gray, grayish white, light gray in part; very fine grain; subrounded to rounded; subdiscoidal; well sorted; up to 15% loose quartz sand; balance varies from an 'ash-stone' with varying amounts of well indurated quartz from 10-80%; non- calcareous; Kenai Borough Alaska USA Hilcorp Alaska, LLC 50-133-10126-02-00 SCU 12B-09 Swanson River Saxon 169 08/11/13 2215 hrs Moderate Larry Resch NO STAIN OR ODOR; 40-90% BRIGHT YELLOW, BECOMING ORANGE TO YELLOW ORANGE FLUORESCENCE AT THE BASE OF THE INTERVAL; INITIALLY AN IMMEDIATE MILKY TO WHITE BURST CUT WITH OCCASIONAL STRONG STREAMING; BRIGHT MILKY FLUORESCENT RING NO VISIBLE RESIDUE. BASE OF INTERVAL DISPLAYS NO IMMEDIATE VISIBLE SOLVENT REACTION OR CUT; FLUORESCENT RESIDUAL RING IS WHITE TO MILKY AND VERY SLIGHTLY LIGHT MILKY TO YELLOW. No 2.2 to 1.6 Mlky-Yel Pixler Plot 1 10 100 1000 10000 1 2 3 4 pp m DRY GAS GAS CONDENSATE OI L NON PRODUCTIVE C1/C2 C1/C4 C1/C5 C1/C3 Hydrocarbon Show Report # 3 Operator: Well: API Number: Field: Date: Rig: Time: County: Depth Start End State: 10590'MD 10700'MD Country: 10339'TVD 10377'TVD Averages Before During After Maximum ROP (fph) 14 40 20 67 WOB 15 39 19 38 RPM slide slide 51 49 Mud Weight 9.32 9.32 9.32 9.32 Chloride 28,500 28,500 28,500 28,500 Total Gas 13 154 102 545 C1 (ppm) 782 2,495 1,551 19,626 C2 (ppm) 68 221 212 2,126 C3 (ppm) 70 381 263 3,383 C4 (ppm) 46 605 218 6,169 C5 (ppm) 36 830 245 5,289 Lithology Cuttings Analysis Odor Moderate Fluorescence Cut Fluorescence Residual Cut Stain none Amount 30-100% Type Fast Amount Amount Distribution even Intensity Strong Color Color Intensity Mod-Bri Color Clear to Residual Fluorescence Cut Color Yel-Org V Lt Whi Intesity Color Color Oil Show Rating Free Oil in Mud Comments Report by: Tuffaceous Sand, Conglomeratic Sand, Tuff, Tuffaceous Claystone (10610' - 10740') = light gray to grayish white, becoming light olive gray, increasing brownish hues; very fine to lower fine grain; subrounded to rounded; subdiscoidal; well sorted in part; generally well indurated within ashy/ weathered tuff matrix; note localized grain supported quartz sandstone with good visual porosity; note well developed coal at 10680'. Kenai Borough Alaska USA Hilcorp Alaska, LLC 50-133-10126-02-00 SCU 12B-09 Swanson River Saxon 169 8/14/2013 1345 hrs Weak Larry Resch FREE OIL AT POSSUM BELLY WELL MIXED WITH DRILLING FLUID; MODERATE HYDROCARBON ODOR AT THE PITS; DRILLING MUD FLUORESCES BRIGHT YELLOW; NO VISIBLE STAIN; 30-100% YELLOW TO ORANGE CUTTING FLUORESCENCE; IMMEDIATE BUT BARELY PERCEPTIBLE CLEAR TO VERY LIGHT WHITE CUT WITH OCCASIONAL VERY LIGHT WHITE TO MILKY STREAM; BARELY VISIBLE VERY LIGHT WHITE FLUORESCENT RING; NO VISIBLE RESIDUE. In mud + floating in pits 2.0 to 2.5 V LT Whi Pixler Plot 1 10 100 1000 10000 1 2 3 4 pp m DRY GAS GAS CONDENSATE OI L NON PRODUCTIVE C1/C2 C1/C4 C1/C5 C1/C3 Hydrocarbon Show Report # 4 Operator: Well: API Number: Field: Date: Rig: Time: County: Depth Start End State: 10730'MD 11017'MD Country: 10386'TVD 10452'TVD Averages Before During After Maximum ROP (fph) 19.5 32.7 229.4 WOB 18.7 11.5 52.0 RPM 51.0 57.7 59.0 Mud Weight 9.20 8.90 no returns Chloride Total Gas 104 59 no returns 112 C1 (ppm) 1,749 5,204 14,865 C2 (ppm) 236 195 773 C3 (ppm) 278 200 572 C4 (ppm) 219 115 352 C5 (ppm) 250 70 435 Lithology Cuttings Analysis Odor Slight-Mod Fluorescence Cut Fluorescence Residual Cut Stain Amount 70-100% Type Fast Amount Amount None Distribution Even Intensity Strong Color Color Intensity Dl to Bri Color Milky Residual Fluorescence Cut Color Org to Yel Intesity Color Color Oil Show Rating Free Oil in Mud Comments Report by: Conglomeratic Sand, Loose Sand, Pebble Fragments (10810' - 10920') = dominantly unconsolidated/ disconsolidated sand and pebble fragments; upper fine to lower medium, occasionally upper medium grain; subangular to subrounded; subprismoidal to subdiscoidal; fair to moderate sorting; locally abundant well rounded subprismoidal pebble fragments with fresh high impact fracture; 60-80% grayish white, translucent, rare transparent quartz; grayish black to dark gray lithics common, occasional reddish orange mafic minerals, trace greenstone. Conglomeratic Sand, Loose Sand, Ash/Tuff 10920' - 11017') = 80-90% loose sand, 20-10% ash/ weathered tuff; upper fine to lower medium grain; subangular to subrounded; subdiscoidal to subprismoidal; occasional well rounded subprismoidal pebble fragments with high impact fractured surfaces; ash/ weathered tuff is white to grayish white with very little clastic component. Kenai Borough Alaska USA Hilcorp Alaska, LLC 50-133-10126-02-00 SCU 12B-09 Swanson River Saxon 169 8/16/2013 1620 hrs Strong Larry Resch (10810-10920) NO VISIBLE OIL STAIN; VERY SLIGHT ODOR; 20% BRIGHT YELLOW, 50% AND GREATER DULL ORANGE FLUORESCENCE EVENLY DISTRIBUTED THROUGHOUT SAMPLES; IMMEDIATE BRIGHTENING WITH VERY LIGHT WHITE FLUORESCENT CUT; VERY FAST MILKY WHITE STREAMERS; MODERATE TO STRONG MILKY FLUORESCENT RING; NO VISIBLE RESIDUE. (10920-11017) NO STAIN; LIGHT ODOR; 90% DULL ORANGE/ 10% BRIGHT YELLOW FLUORESCENCE; WATER IN PROCESSED SAMPLES FLUORESCES; IMMEDIATE BRIGHTENING WITH BURST OF FLUORESCENT WHITE WHICH DISSIPAITES QUICKLY; BRIGHT WHITE FLUORESCENT RING; NO VISISBLE RESIDUE. Yes 2.5 White Pixler Plot 1 10 100 1000 10000 1 2 3 4 pp m DRY GAS GAS CONDENSATE OI L NON PRODUCTIVE C1/C2 C1/C4 C1/C5 C1/C3 SCU 12B-09 28 6 DAILY REPORTS Hilcorp Alaska, LLC Swanson River Rield DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Pederson DATE: July 13, 2013 DEPTH - PRESENT OPERATION: CBU for produced water TIME: 2359 hrs YESTERDAY - 24 HOUR FOOTAGE - CASING INFORMATION 11.75" @ 2009' 7" @ 9850' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 1RR 6.00" BHC / MX-18HDX 52101114 3x16 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 9800'/9792' MW 10.3 VIS 54 PV 14 YP 19 Gels 6/7/8 FL 4.1 FC 1/1 SOL 7.0 NAF/W 0.0/90.2 SD - MBT 1.0 pH 9.4 ALK 0.4 Cl- 35000 Ca+ 200 MWD SUMMARY INTERVAL - TO - TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS 919 u CUTTING GAS - @ - @ - WIPER GAS - CHROMATOGRAPHY (ppm) SURVEY - METHANE (C-1) - @ - @ - CONNECTION GAS HIGH - ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG - PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT - BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND - PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS - INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY - PRESENT LITHOLOGY - DAILY ACTIVITY SUMMARY TIH from 1656’ to 5476’. Add pipe onto rack, strap, insert strap into pipe tally. TIH from 5476’ to 5692’. Fill pipe, calibrate Pason torque, pump strokes, flow and gas sniffer with Pason tech. TIH from 5692’ to 6203’. Tag at 6203’; 1,600 rotating torque, max torque = 6,000; reamed twice. TIH from 6203’ to 7005’. Trips/PU singles from 7005’ to 8000’. Trips load pipe rack strap add to tally. Trips/RIH with singles, tag plug at 9850’. Condition mud and circulate; PJSM, T brake circulation with water at 5 BPM, 20 RPM. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860 REPORT BY: Mike Sherry Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Pederson DATE: July 14, 2013 DEPTH 9849' PRESENT OPERATION: P/U Whipstock and milling assembly TIME: 2359 hrs YESTERDAY - 24 HOUR FOOTAGE - CASING INFORMATION 11.75" @ 2009' 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 2 6.0625" BOT Mill - casing cutter 10127231 - 9849' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 9850' / 9842' MW 10.45 VIS 50 PV 13 YP 16 Gels 5/6/8 FL 3.6 FC 1/1 SOL 7.5 NAF/W 0.0/89.8 SD - MBT 1.0 pH 9.1 ALK 0.30 Cl- 35000 Ca+ 80 MWD SUMMARY INTERVAL - TO - TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS 1153 u CUTTING GAS - @ - @ - WIPER GAS - CHROMATOGRAPHY (ppm) SURVEY - METHANE (C-1) - @ - @ - CONNECTION GAS HIGH - ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG - PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT - BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND - PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS - INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY - PRESENT LITHOLOGY - DAILY ACTIVITY SUMMARY Test casing, RU test casing to 3000 PSI for 30 minutes on Charted. Change out wash pipe. Test 9849’ of 7” casing to 300 PSI and hold for 30 minutes. Prep rig floor and board to POOH. POOH from 9849’ to Jars. Turn elevators around to lay down jars. Directional work – LD BHA, PU tools. Rig service change out grabber DIE’s. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860 REPORT BY: Mike Sherry Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Pederson DATE: July 15, 2013 DEPTH 9830' PRESENT OPERATION: Milling out window TIME: 2359 hrs YESTERDAY 24 HOUR FOOTAGE CASING INFORMATION 11.75" @ 2009' 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 2 6.0625" BOT Mill - casing cutter 10127231 - 9830' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 9850' / 9842' MW 10.45 VIS 51 PV 14 YP 18 Gels 6/7/8 FL 3.7 FC 1/1 SOL 7.7 NAF/W 0.0/89.6 SD - MBT 1.0 pH 9.0 ALK 0.25 Cl- 35000 Ca+ 100 MWD SUMMARY INTERVAL - TO - TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS 257 u CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 40 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS - INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY - PRESENT LITHOLOGY - DAILY ACTIVITY SUMMARY RIH with whipstock to 9796’. Displace well with 10.5 PPG 6% KCl PHPA mud. Rig up wireline tools. Run in the hole with gyro. Orient whipstock, tag at 9849; gyro tool face set at 307 degrees. Logging while POOH with wireline. RD wireline. Set whipstock. Mill out window. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860 REPORT BY: Mike Sherry Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR Greco, Rose, Grubb, Pederson DATE July 16, 2013 DEPTH 9869' PRESENT OPERATION L/D Milling assembly TIME 2359 hrs YESTERDAY 9830' 24 HOUR FOOTAGE 39 CASING INFORMATION 11.75" @ 2009' 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 6.0625" BOT Mill - casing cutter 10127231 - 9830' 9869' 39' 9.8 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 9. @ 9854' 1 @ 9839' 3.7 3 FT/HR SURFACE TORQUE 7381 @ 9836' 334 @ 9831' 4197.4 3741 AMPS WEIGHT ON BIT 15 @ 9855' 4 @ 9834' 11.0 14 KLBS ROTARY RPM 84 @ 9831' 77 @ 9838' 83.3 84 RPM PUMP PRESSURE 1267 @ 9867' 809 @ 9833' 1079.7 1210 PSI DRILLING MUD REPORT DEPTH 9,870' / 9,862' MW 10.5 VIS 51 PV 15 YP 20 FL 3.7 Gels 6/8/9 CL- 33000 FC 1/1 SOL 7.8 SD - OIL 0.0 / 89.6 MBL 1.0 pH 9.8 Ca+ 200 CCI MWD SUMMARY INTERVAL - TO - TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 139 @ 9840' 16 @ 9867' 29.8 TRIP GAS 257 u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ CONNECTION GAS HIGH ETHANE (C-2) @ @ AVG PROPANE (C-3) @ @ CURRENT BUTANE (C-4) @ @ CURRENT BACKGROUND/AVG 8 u PENTANE (C-5) @ @ HYDROCARBON SHOWS - INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY - PRESENT LITHOLOGY - DAILY ACTIVITY SUMMARY Mill out window (top of window @ 9830’, bottom of window @ 9843’), mill rathole to 9870’. Pump sweep, circulate, rotate, and reciprocate/polish window. FIT test to 13.5 equivalent mud weight / flow check. Pump slug. POOH from 9870’-7840’. POOH from 7840’ to BHA. L/D BHA. CANRIG PERSONNEL ON BOARD Resch, Sherry, Grundin DAILY COST $2860 REPORT BY Mike Sherry Page 1 of 1Daily Report 7/17/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Rose, Grubb, Pederson DATE: July 17, 2013 DEPTH 9869' PRESENT OPERATION: RIH TIME: 2359 hrs YESTERDAY 9830' 24 HOUR FOOTAGE 39' CASING INFORMATION 11.75" @ 2009' 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" DP505FX / HCC Bit #2 7028786 5x11 9869' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 9 @ 9854' 1 @ 9839' 3.7 3 FT/HR SURFACE TORQUE 7381 @ 9836' 334 @ 9831 4197.4 3741 FT-LBS WEIGHT ON BIT 15 @ 9855' 4 @ 9834' 11 14 KLBS ROTARY RPM 84 @ 9831' 77 @ 9838' 83.3 84 RPM PUMP PRESSURE 67 @ 9867' 809 @ 9833' 1079.7 1210 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 9870' / 9862' MW 10.5 VIS 52 PV 12 YP 22 Gels 5/7/8 FL 3.5 FC 1/1 SOL 7.8 NAF/W 0.0/89.6 SD - MBT 1.0 pH 9.9 ALK 0.60 Cl- 33000 Ca+ 160 MWD SUMMARY INTERVAL 9869' TO 9869' TOOLS Gamma, ECD, Resistivity, Directional, Density, Caliper, Porosity GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 5 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS - INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY - PRESENT LITHOLOGY - DAILY ACTIVITY SUMMARY L/D BHA #2, clean floor of all un-needed tools. Rig service, clean floor, grease crown, washpipe, top drive. P/U directional tools, BHA #3, scribe tools. Test MWD tools. RIH. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/18/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Rose, Grubb, Pederson DATE: July 18, 2013 DEPTH 9869' PRESENT OPERATION: BOP test TIME: 2359 hrs YESTERDAY 9869' 24 HOUR FOOTAGE 0' CASING INFORMATION 11.75 @ 2009' 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3 6 DP505FX / HCC bit#2 7028786 5x11 9869' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 9870' / 9862' MW 10.55 VIS 52 PV 13 YP 20 Gels 5/7/8 FL 3.7 FC 1/1 SOL 7.8 NAF/W 0.0/89.6 SD - MBT 1.0 pH 9.9 ALK 0.40 Cl- 33000 Ca+ 160 MWD SUMMARY INTERVAL 9869' TO 9869' TOOLS Gamma, ECD, Resistivity, Directional, Caliper, Porosity GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 0 @ 0 @ 0.0 TRIP GAS CUTTING GAS 0 @ 0 @ 0.0 WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 0 @ 0 @ 0.0 CONNECTION GAS HIGH ETHANE (C-2) 0 @ 0 @ 0.0 CONNECTION GAS: AVG PROPANE (C-3) 0 @ 0 @ 0.0 CONNECTION GAS: CURRENT BUTANE (C-4) 0 @ 0 @ 0.0 CURRENT AVG BACKGROUND 2 u PENTANE (C-5) 0 @ 0 @ 0.0 HYDROCARBON SHOWS - INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY - PRESENT LITHOLOGY - DAILY ACTIVITY SUMMARY Cut off 75’ drilling line. Test MWD tool. Circulate sweep. R/U wireline tools. Wireline S/M with wireline crew R/D wireliners. S/M with crew for TOH and clean and prep floor. Flow check S/M TOH for sub in BHA from 9862’ to 483’. BOP drill while TIH procedures. Finish POOH. L/D directional tools / remove source. Clean and clear rig floor. Test BOP. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/19/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Rose, Grubb, Pederson DATE: July 19, 2013 DEPTH 9869' PRESENT OPERATION: Baker troubleshooting tools TIME: 2359 hrs YESTERDAY 9869' 24 HOUR FOOTAGE 0' CASING INFORMATION 11.75" @ 2009' 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" DP505FX / HCC bit#2 7028786 5x11 9869' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 9870' / 9862' MW 10.50 VIS 46 PV 17 YP 19 Gels 5/6/7 FL 3.8 FC 1/2 SOL 8.0 NAF/W 0.0/89.6 SD MBT 1.0 pH 9.2@74 ALK 0.40 Cl- 31,000 Ca+ 120 MWD SUMMARY INTERVAL 9869' TO 9869' TOOLS Gamma, ECD, Resistivity, Directional, Caliper, Porosity GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 0 @ 0 @ 0.0 TRIP GAS CUTTING GAS 0 @ 0 @ 0.0 WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 0 @ 0 @ 0.0 CONNECTION GAS HIGH ETHANE (C-2) 0 @ 0 @ 0.0 CONNECTION GAS: AVG PROPANE (C-3) 0 @ 0 @ 0.0 CONNECTION GAS: CURRENT BUTANE (C-4) 0 @ 0 @ 0.0 CURRENT AVG BACKGROUND PENTANE (C-5) 0 @ 0 @ 0.0 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY DAILY ACTIVITY SUMMARY Test BOP components Test blind Rams @ 250PSI and 4000PSI. Pull test plug and install wear bushing. S/M with DD & rig crew for making up BHA. M/U bit, motor, UBHP and orientate UBHO. S/M with MWD and RPS to install sources. M/U BHA. M/U directional tools; test MWD tool. POOH MWD failure. Unload radio active sources. L/D MWD tools; P/U new tools and upload data CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Nick Barber Page 1 of 1Daily Report 7/20/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Rose, Grubb, Pederson DATE: Jul 20, 2013 DEPTH 9961' PRESENT OPERATION: Sliding TIME: 2359 hrs YESTERDAY 9869' 24 HOUR FOOTAGE 92' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH No true surveys taken BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 9869' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 54.2 @ 9913' 0.9 @ 9875' 23.8 39.29 FT/HR SURFACE TORQUE 3741 @ 9869' 13 @ 9886' 62.7 0.00 FT-LBS WEIGHT ON BIT 15 @ 9873' 1 @ 9937' 3.6 2.93 KLBS ROTARY RPM 83 @ 9869' 83 @ 9869' 0.9 0.00 RPM PUMP PRESSURE 2322 @ 9952' 63 @ 9870' 2083.5 2262.84 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 9957' / 9957' MW 10.55 VIS 48 PV 14 YP 19 Gels 5/6/8 FL 3.8 FC 1/2 SOL 7.8 NAF/W 0.0/89.6 SD - MBT 1.0 pH 9.5 ALK 0.4 Cl- 33000 Ca+ 160 MWD SUMMARY INTERVAL 9869' TO TOOLS PDC bit on mud motor with Ontrak MWD, BCPM, SDN GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 26 @ 9940' 1 @ 9872' 5.1 TRIP GAS - CUTTING GAS 0 @ 9961' 0 @ 9961' 0.0 WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 4811 @ 9940' 13 @ 9870' 741.9 CONNECTION GAS HIGH - ETHANE (C-2) 188 @ 9948' 0 @ 9870' 18.8 CONNECTION GAS: AVG - PROPANE (C-3) 68 @ 9948' 0 @ 9887' 12.2 CONNECTION GAS: CURRENT BUTANE (C-4) 34 @ 9947' 0 @ 9872' 5.2 CURRENT AVG BACKGROUND 3 u PENTANE (C-5) 70 @ 9947' 0 @ 9887' 6.2 HYDROCARBON SHOWS - INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous Sandstone, Tuffaceous Siltstone PRESENT LITHOLOGY Tuffaceous Sandstone/Tuffaceous Siltstone DAILY ACTIVITY SUMMARY TIH to 9747’. Test MWD tool. TIH from 9747’ to 9867’. S/M with wireline, DD, and rig crew about wireline inside DP. R/U and run wireline logs. Slide from 9870’ to 9965’. POOH to remove side entry sub. POOH with wireline; R/D wireline equipment. Drill from 9965’ to XXXX’ CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/21/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Rose, Grubb, Pederson DATE: Jul 21, 2013 DEPTH 10087' PRESENT OPERATION: Make up BHA TIME: 11:02:18 YESTERDAY 9961' 24 HOUR FOOTAGE 126' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 9965' 9.32 327.14 9956.82' 10028' 12.44 322.36 10018.68' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" DP505FX / HCC bit#2 7028786 5x11 /0.464 9869' 10087' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 141.2 @ 10011' 0.9 @ 10047' 28.1 48.08 FT/HR SURFACE TORQUE 3398 @ 9965' 4 @ 10070' 408.0 0 FT-LBS WEIGHT ON BIT 17 @ 9971' 1 @ 10085' 4.9 3.03 KLBS ROTARY RPM 55 @ 9966' 0 @ 10021' 1.8 0 RPM PUMP PRESSURE 2280 @ 10049' 1868 @ 10012' 2091.4 2103.11 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10087/10078 MW 10.50 VIS 46 PV 14 YP 20 Gels 5/6/8 FL 3.8 FC 1/2 SOL 7.4 NAF/W 0.0/90.0 SD .10 MBT 1.0 pH 9.5 ALK .80 Cl- 33000 Ca+ 120 MWD SUMMARY INTERVAL 9869' TO 10087' TOOLS PDC bit on mud motor with Ontrak MWD, BCPM, SDN GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 17 @ 10072' 0 @ 9978' 5.4 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 2091 @ 10000' 120 @ 9978' 535.2 CONNECTION GAS HIGH ETHANE (C-2) 153 @ 10073' 1 @ 10033' 27.3 CONNECTION GAS: AVG - PROPANE (C-3) 131 @ 10071' 0 @ 9975' 22.0 CONNECTION GAS: CURRENT BUTANE (C-4) 76 @ 10071' 0 @ 10033' 11.7 CURRENT AVG BACKGROUND 2 u PENTANE (C-5) 56 @ 9981' 0 @ 10033' 7.0 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, Tuffaceous siltstone, conglomeritic sand, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, conglomeritic sand and loose sand DAILY ACTIVITY SUMMARY Drill actual slide from 10015’ to 10087’. Trip out 5 stands and wait on orders. Rig service: grease blocks TD, DW, swivel, check dead man bolts and BOP drill. Trip out of hole to dial up motor. Rig service/grease TD, DW, check all fluids. POOH. Unload radioactive sources, L/W directional tools. Adjust motor to 1.4 degree bend, load data, load radioactive sources. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: 3260 REPORT BY: Nick Barber Page 1 of 1Daily Report 7/22/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Rose, Grubb, Pederson DATE: Jul 22, 2013 DEPTH 10246' PRESENT OPERATION: Drilling ahead TIME: 2359 hrs YESTERDAY 10087' 24 HOUR FOOTAGE 159' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10104' 17.25 317.18 10092.12' 10137' 18.99 317.15 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 205.9 @ 10177' 0.5 @ 10088' 48.0 13.43 FT/HR SURFACE TORQUE 4373 @ 10178' 0 @ 10167' 1386.5 0.00 FT-LBS WEIGHT ON BIT 14 @ 10109' 0 @ 10196' 4.0 6.84 KLBS ROTARY RPM 59 @ 10131' 1 @ 10229' 21.5 0.00 RPM PUMP PRESSURE 2321 @ 10221' 1837 @ 10173' 2102.0 2110.02 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD MW 10.4 VIS 46 PV 17 YP 21 Gels 5/6/8 FL 3.8 FC 1/2 SOL 7.5 NAF/W 0.0/90.0 SD 0.10 MBT 1.0 pH 9.9 ALK 0.80 Cl- 32000 Ca+ 120 MWD SUMMARY INTERVAL 9869' TO TOOLS PDC bit on mud motor with Ontrak MWD, BCPM, SDN GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 184 @ 10190' 0 @ 10110' 24.5 TRIP GAS 16 u CUTTING GAS 0 @ 10246' 0 @ 10246' 0.0 WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 18824 @ 10191' 122 @ 10110' 2050.8 CONNECTION GAS HIGH 106 u ETHANE (C-2) 2186 @ 10190' 5 @ 10103' 262.8 CONNECTION GAS: AVG 35 u PROPANE (C-3) 1576 @ 10190' 0 @ 10090' 248.8 CONNECTION GAS: CURRENT BUTANE (C-4) 660 @ 10189' 0 @ 10097' 128.5 CURRENT AVG BACKGROUND 10 u PENTANE (C-5) 2434 @ 10189' 0 @ 10127' 99.3 HYDROCARBON SHOWS Fair shows from 10130'-10160' and 10190'-10240' INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 1: 10130'-10160'has fair show 2: 10190'- 10240' has a fair show. 1: Signs of oil where tuffaceous sandstone dominates after coal and carbonaceous shale at 10125'. Diminishes when tuffaceous sandstone diminishes. 2: Predominately tuffaceous sandstone with some loose sand, with signs of oil throughout interval. 1: Gas peak of 65 units in middle of oil show. 2: Gas peak of 185 units just above start of oil show; otherwise fairly consistent throughout interval. 1: No visible stain; no odor; 40-75% bright yellow to yellow white fluorescence; immediate milky to milky-white burst fluorescent cut; strong light milky to yellow fluorescent ring; no visible residue; fluorescence changes to orange to dull orange by 10160'-10170' sample 2: No visible stain; very slight to slight odor; 70-90% bright yellow sample fluorescence; immediate bright milky yellow cut fluorescence; moderate light yellow-orange redidual ring; no visible residual cut. LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY TIH from 5126’ to 10088’. Slide from 10088’ to 10131’. Rotate from 10131’ to 10158’. Slide from 10158’ to 10173’. Rotate from 10173’ to 10197’. Slide from 10197’ to 10204’. Drilling from 10204’ to XXXXX’ CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/23/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Grubb, Pederson, Rose DATE: Jul 23, 2013 DEPTH 10262' PRESENT OPERATION: Pumping LCM and building volume TIME: 2359 hrs YESTERDAY 10246' 24 HOUR FOOTAGE 16' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 44.5 @ 10260' 5.0 @ 10248' 14.9 5.51065 FT/HR SURFACE TORQUE 350 @ 10249' 350 @ 10249' 21.9 0.00000 FT-LBS WEIGHT ON BIT 9 @ 10257' 2 @ 10260' 4.8 5.18000 KLBS ROTARY RPM 15 @ 10249' 15 @ 10249' 1.0 0.00000 RPM PUMP PRESSURE 2414 @ 10258' 2110 @ 10246' 2465.5 2281.62988 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10263 / 10250 MW 10.20 VIS 48 PV 14 YP 19 Gels 6/8/9 FL 3.8 FC 1/0 SOL 6.5 NAF/W 0.0/91.0 SD .10 MBT 1.0 pH 8.6 ALK .90 Cl- 32000 Ca+ 160 MWD SUMMARY INTERVAL 9863' TO TOOLS PDC bit on mud motor with Ontrak MWD, BCPM, SDN GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 23 @ 10254' 6 @ 10262' 18.4 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 1798 @ 10246' 474 @ 10257' 919.8 CONNECTION GAS HIGH ETHANE (C-2) 194 @ 10246' 64 @ 10257' 111.2 CONNECTION GAS: AVG PROPANE (C-3) 271 @ 10256' 108 @ 10257' 150.7 CONNECTION GAS: CURRENT BUTANE (C-4) 140 @ 10256' 56 @ 10257' 80.5 CURRENT AVG BACKGROUND 4 u PENTANE (C-5) 69 @ 10256' 26 @ 10248' 34.8 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tufffaceous sandstone, tuffaceous claystone, and loose sand DAILY ACTIVITY SUMMARY Lost circulation at 10262, pumped down hole and down back side. POOH to shoe. Build two LCM pills and spot down hole. Fluid loss 303 BBL. Build volume and LCM pills. TIH from 9846’ to 10262’. Pump 50 BBL 35 lb per BBL LCM pill. TOH from 10262’ to 9814’. Pump mud down backside to fill hole and check for loses and build volume. TIH from 9847’ to 10262’. Pump 23 BBL of 35 lb per BBL LCM pill. Pump on backside and squeeze 16 BBL. Filled hole with trip tank and monitor well. Pumped second 23 BBL of 35 lb LCM pill. Pumped on backside and squeezed 19 BBL. Filled with trip tank and monitor well. Pump third 23 BBL of 35 lb LCM pill. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Nick Barber Page 1 of 1Daily Report 7/24/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\DESKTOP\MI ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Grubb, Pederson, Rose DATE: Jul 24, 2013 DEPTH 10271' PRESENT OPERATION: Building mud volume TIME: 2359 hrs YESTERDAY 10262' 24 HOUR FOOTAGE 9' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 1986 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 91.4 @ 10266' 5.5 @ 10262' 54.8 6.26 FT/HR SURFACE TORQUE 0 @ 10271' 0 @ 10271' 0.0 0.00 FT-LBS WEIGHT ON BIT 7 @ 10263' 1 @ 10271' 3.5 1.60 KLBS ROTARY RPM 0 @ 10271' 0 @ 10271' 0.0 0.00 RPM PUMP PRESSURE 2281 @ 10262' 1432 @ 10271' 2045.1 1432.45 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260' MW 10.2 VIS 50 PV 14 YP 18 Gels 5/6/7 FL 4.4 FC 1/0 SOL 6.6 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 8.6 ALK 0.01 Cl- 30500 Ca+ 160 MWD SUMMARY INTERVAL 9869' TO TOOLS PDC bit on mud motor with OnTrak, MWD, BCPM, SDN GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 15 @ 10263' 0 @ 10266' 2.9 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 0 @ 10271' 0 @ 10271' 0.0 CONNECTION GAS HIGH ETHANE (C-2) 0 @ 10271' 0 @ 10271' 0.0 CONNECTION GAS: AVG PROPANE (C-3) 0 @ 10271' 0 @ 10271' 0.0 CONNECTION GAS: CURRENT BUTANE (C-4) 0 @ 10271' 0 @ 10271' 0.0 CURRENT AVG BACKGROUND 0 u PENTANE (C-5) 0 @ 10271' 0 @ 10271' 0.0 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY Finished chasing third 23 BBL, 35 lb per BBL pill outside of bit. TOH inside window. Built mud volume. RIH to bottom to pump 23 BBL, 35 lb per BBL LCM pill. Closed bag, and squeezed pill with 18.5 BBL mud; maximum pressure 320 PSI. RIH to bottom and drill ahead. Drilled 8’ of new formation with initial returns; lost returns shortly after; lost 167 BBL. Spotted 23 BBL, 50 lb per BBLLCM pill on bottom and TOH to inside window. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/25/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Grubb, Pederson, Rose DATE: Jul 25, 2013 DEPTH 10271' PRESENT OPERATION: Monitoring losses / building volume TIME: 2359 hrs YESTERDAY 10271' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260' MW 10.2 VIS 48 PV 12 YP 16 Gels 5/6/7 FL 4.6 FC 1/0 SOL 6.5 NAF/W 0.0/91.0 SD 0.1 MBT 1.0 pH 8.9 ALK 0.4 Cl- 31000 Ca+ 160 MWD SUMMARY INTERVAL 9869' TO TOOLS PDC bit on mud motor with OnTrak, MWD, BCPM, SDN GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous Sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY Spotted 25 BBL, 20 lb per BBL LCM pil. Squeezed 19.6 BBL at 244 PSI. Tripped up inside window. Monitored well; 34.5 BBL per hour static losses. Built mud volume. Checked static well losses again; 70.5 BBL per hour. RIH to bottom to spot another 25 BBL, 20 lb per BBL LCM pill. Monitored well; ~30 BBL per hour static losses. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/26/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Grubb, Pederson, Holiday DATE: Jul 26, 2013 DEPTH 10271 PRESENT OPERATION: Preparing to test BOPs TIME: 2359 hrs YESTERDAY 10271' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3RR 6" DP505FX / HCC bit#2 7028786 5x11 / 0.464 10087' 10271' 184' 8.7 12CTGX1/16BTHP To cement DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260' MW 10.20 VIS 46 PV 10 YP 16 Gels 6/7/8 FL 4.2 FC 1/0 SOL 6.5 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 8.9 ALK 0.4 Cl- 32000 Ca+ 200 MWD SUMMARY INTERVAL 9869' TO 10271' TOOLS PDC bit on mud motor with OnTrak, MWD, BCPM, SDN GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 0 @ 0 @ 0 TRIP GAS - CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 2 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY Monitor well with trip tank while building mud volume. POOH from 9775’ to 8907’. Rig service: greased DW, tongs, inspected slips, DM, DN, and checked oil levels. TOH from 8904’ to 5909’ slowly and monitor losses. TOH from 5909’ to 735’ then lay down HWDP from 735’ to 405’ L/O Commander sub and jars. LD directional tools. Unload radioactive sources. Download date from BPCM. Lay down mud motor. Test MWD tool. Clean and clear rig floor. Remove wear bushing/flush out top drive with water. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/27/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Grubb, Pederson, Holiday DATE: Jul 27, 2013 DEPTH 10271' PRESENT OPERATION: RIH to plug with cement TIME: 2359 hrs YESTERDAY 10271' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260' MW 10.20 VIS 49 PV 13 YP 16 Gels 6/7/8 FL 4.6 FC 1/0 SOL 6.5 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 8.9 ALK 0.3 Cl- 32000 Ca+ 240 MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 0 @ 0 @ 0 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 2 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY Test BOPs. Pull test plug; install wear bushing and blow down choke manifold. S/M with Weatherford; RU power tongs and get all tools on floor to run 2 7/8 tubing. Run 30 JTs of 2 7/8 tubing from 0’ to 953’. RD Weatherford tool and equipment. Rig service; grease BLLKS, crown, TD. RIH from 957’ to 7450’. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/28/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson, Holiday DATE: Jul 28, 2013 DEPTH 10271' PRESENT OPERATION: Monitoring losses / Building mud TIME: 2359 hrs YESTERDAY 10271' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED - DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD MW 10.2 VIS 53 PV 11 YP 18 Gels 7/8/9 FL 4.6 FC 1/0 SOL 6.5 NAF/W 0.0/91.0 SD 0.1 MBT 1.0 pH 8.9 ALK 0.3 Cl- 32000 Ca+ 400 MWD SUMMARY INTERVAL - TO - TOOLS - GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS @ - @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 1 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY Monitor well with trip tank while rigging up Schlumberger cementers. RU and pump cement plug. Trip from 10262’ to 8566’. Pump nerf ball through pipe to clear pipe and 186 BBLS bottoms up. Monitor well with trip tank with losses of 7.3 BBL per hour. Wait on cement 8-10 hours; monitor well for losses. RIH from 8561’ to 9200’. Wash down from 9200’ to 10271’. Build Baraseal pill; monitor well with trip tank. Pump 23 BBL of Baraseal and chase with 30 BBL of mud. Monitor well with trip tank; build 80 lb per BBL of Baracarb pill. Pump 23 BBL of 80 lb per BBL Baracarb pill. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Barber __DAILY COST: $3260 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/29/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 PB1 REPORT FOR: Grubb, Greco, Pederson, Perkovich DATE: Jul 29, 2013 DEPTH 10271' PRESENT OPERATION: TOH 30 stands off bottom TIME: 2359 hrs YESTERDAY 10271' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED - DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260' MW 10.2 VIS 48 PV 10 YP 17 Gels 6/7/8 FL 4.8 FC 1/0 SOL 6.6 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 8.9 ALK 0.30 Cl- 30000 Ca+ 200 MWD SUMMARY INTERVAL - TO - TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY Squeeze Baracarb pill. Monitor well with trip tank. Continue to squeeze Baracarb pill. Circulate bottoms up. Monitor well with trip tank. Pumped 21 BBL of 20 lb per BBL Baracarb; chase with 105 BBL of 10.2 weight mud. TOH from 10263’ to 9500’. Squeeze 17.5 BBL of 80 lb per BBL pill. Hold 161 PSI on B/S while letting seep into formation. Squeeze remaining 4 BBL of 80 lb per BBL pill. Hold 162 PSI on B/S while letting seep into formation. TIH from 9509’ to 10263’. Monitor well with trip tank. S/M with Schlumberger cementers. Pump 1 BBL of H2O; pressure test lines to 3500 PSI. Pump 10 BBL of mud push @ 12 PPG; pump 50 BBL of cement @ 16.5 PPG. Pump 5 BBL of mud push @ 12 PPG; displace with 83 BBL of mud. R/D cement equipment. POOH 30 stands. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/30/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 PB1 REPORT FOR: Grubb, Greco, Pederson, Perkovich DATE: Jul 30, 2013 DEPTH 10271' PRESENT OPERATION: Condition mud and circulate TIME: 2359 hrs YESTERDAY 10271' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260' MW 10.2 VIS 45 PV 10 YP 18 Gels 6/7/8 FL 4.8 FC 1/0 SOL 6.6 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 10.2 ALK 0.30 Cl- 30000 Ca+ 600 MWD SUMMARY INTERVAL - TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceuous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY Circulate surface to surface. Monitor well with trip tank. Wait on cement. Monitor well with trip tank for 15 minutes; zero losses. TIH to tag cement from 8379’ to 8800’; wash from 8800’ to 9300’, no tag. Circulate bottoms up; signs of cement returns. TIH wash from 9300’ to 9500’. Circulate bottoms up; signs of cement returns. TOH from 9500’ to 9300’. Monitor well with trip tank for 15 minutes; zero losses. Wait on cement. Rig service: greased DW, TD, brake linkage, crown, adjusted brake handle, checked oil, floor motor, TD, rotary table, gear-ends of MP. Wait on cement. TIH from 9317’ to 10002’. Condition mud and circulate. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin __DAILY COST: $2860 REPORT BY: Mike Sherry Page 1 of 1Daily Report 7/31/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 PB1 REPORT FOR: Grubb, Greco, Pederson, Perkovich DATE: Jul 31, 2013 DEPTH 10271' PRESENT OPERATION: RIH to pollish cement TIME: 2359 hrs YESTERDAY 10271' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" HCC STX1 5224897 3x20 / 0.9204 Top of cement DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260' MW 10.25 VIS 48 PV 12 YP 23 Gels 8/9/10 FL 6.7 FC 1/2 SOL 6.4 NAF/W 0.0/91.0 SD 0.10 MBT 1.0 pH 10.1 ALK 2.10 Cl- 33000 Ca+ 800 MWD SUMMARY INTERVAL - TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY POOH from 10002’ to 5200’. POOH from 5200’ to 757’. Well control drill while tripping. R/D DP handling equipment. R/U tubing equipment. POOH L/D 2 7/8” tubing from 757’ to 400’. Repair brake linkage; service rig. POOH L/D 2 7/8” tubing from 400’ to surface. R/D tubing equipment. R/U DP handling equipment. PJSM – P/U rotary BHA. RIH. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/1/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 PB1 REPORT FOR: Grubb, Greco, Pederson, Perkovich DATE: Aug 1, 2013 DEPTH 10271' PRESENT OPERATION: RIH to cement TIME: 2159 hrs YESTERDAY 10271' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" HCC STX1 5224897 3x20 / 0.9204 10006' 10026' 20' 0.28 Depth reached DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10271' / 10260' MW 10.25 VIS 52 PV 15 YP 24 Gels 8/10/11 FL 5.6 FC 1/2 SOL 6.6 NAF/W 0.0/90.8 SD - MBT 1.0 pH 9.7 ALK 2.00 Cl- 33000 Ca+ 800 MWD SUMMARY INTERVAL - TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS 10 u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous Sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY TIH from 350’ to 9933’. Wash down from 9933’ to 10006’. Drill/dress cement. Condition mud and circulate/PR. Pump dry job. Trip/POOH from 10020’ to BHA. L/D BHA. R/U Weatherford, change handling equipment. Rig up third party tubing equipment; hold S/M; strap pipe. TIH with 2 7/8” tubing from 1’ to 799’. Rig down third party tools and prep floor to TIH with drill pipe. TIH with drill pipe from 799’ to 2620’. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/2/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 PB1 REPORT FOR: Grubb, Greco, Pederson, Perkovich DATE: Aug 2, 2013 DEPTH 10271' PRESENT OPERATION: L/D 2 7/8" tubing TIME: 2359 hrs YESTERDAY 10271' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10028' 12.44 321.81 10018.68' 10104' 17.25 316.31 10092.12' 10137' 18.99 316.29 10123.49' 10170' 19.86 316.99 10154.61' 10201' 20.82 316.40 10183.67' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED - DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10026' / 10018' MW 10.3 VIS 50 PV 13 YP 22 Gels 8/10/12 FL 5.8 FC 1/2 SOL 7.0 NAF/W 0.0/90.6 SD - MBT 1.0 pH 10.3 ALK 2.20 Cl- 30000 Ca+ 560 MWD SUMMARY INTERVAL - TO - TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous claystone, tuffaceous siltstone, loose sand PRESENT LITHOLOGY Tuffaceous sandstone, tuffaceous claystone, loose sand DAILY ACTIVITY SUMMARY Circulate and reciprocate; GPM = 247; SPP = 1115. Rig service. R/U to pump cement / mix mud push; 12 lb. PJSM with all involved, batch and pump as per Schlumberger program. Schlumberger displace cement with 87BBL 10.2 PPG mud. Trips; POOH from 10020’ to 8400’. Condition mud and circulate; drop wiper ball; brake circulation @ 4 BBL/min; increase rate to 8 BBL/min; surface to surface with 10.2 PPG mud. Cut off drilling line; slip and cut 78’. Pump slug; POOH from 8400’ to 7160’. POOH from 7160’ to 799’. S/M with Weatherford hand and L/D 2 7/8” tubing. L/D 2 7/8” tubing from 799’-1’. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/3/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 03, 2013 DEPTH 9831' PRESENT OPERATION: POOH; slip die fell down hole TIME: 2359 hrs YESTERDAY 9831' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3RR1 6" HCC STX-1 5224897 3x20 / 0.9204 9831' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10026' / 10018' MW 10.3 VIS 50 PV 13 YP 22 Gels 8/10/12 FL 6.0 FC 1/2 SOL 7.0 NAF/W 0.0/90.6 SD - MBT 1.0 pH 11 ALK 2.7 Cl- 31000 Ca+ 840 MWD SUMMARY INTERVAL - TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY DAILY ACTIVITY SUMMARY R/D tubing equipment. Drain stack and pull wear bushing. S/M over pressure testing. Flush stack with fresh water; install test plug; flush with fresh water through kill line and HCR line to poorboy degasser. R/U BOP test equipment. Test BOP; annular 250/2500 PSI; test rams; choke; kill and string valves to 250-4000 PSI for 10 minutes each; all tests charted. Test BOP. Pull test plug; set wear ring; blow down choke manifold. Trips; P/U BHA; load pipe rack with 17 JTS HWDP; strap. TIH from 313’ to 996’. Waiting on orders: one slip die came out of bottom portion of DP slips when pulling slips during connection, resulting on die going down hole. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3420 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/4/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 04, 2013 DEPTH 9831' PRESENT OPERATION: Circulate/condition mud TIME: 2359 hrs YESTERDAY 9843' 24 HOUR FOOTAGE 12' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3RR1 6" HCC STX-1 5224897 3x20 / 0.9204 9207' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 9801' / 9793' MW 9.9 VIS 53 PV 14 YP 18 Gels 6/8/11 FL 8.4 FC 1/2 SOL 5.5 NAF/W 0.0 / 92.2 SD - MBT 1.0 pH 12.1 ALK 3.10 Cl- 29000 Ca+ 2080 MWD SUMMARY INTERVAL - TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 5 @ 9843 0 @ 9831.00000 - TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS - INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY DAILY ACTIVITY SUMMARY Safety meeting over gently POOH while pulling die up with BHA. Slowly POOH from 996’ to 20’. Fish slip die out of BOP. Install wear bushing. TIH from 0’ to 996’. TIH from 996’ to 3600’. Trips; RIH from 3824’ to 9076’; tag cement. Condition mud and circulate; brake circulation at 4 BBL; wash down to 9207; tag hard cement. Drill hard cement at 9207’; WOB 2/4k; increase WOB 5/8k. Drill cement from 9500’ to 9843’; WOB 12. Circulate, reciprocate, condition mud. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3420 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/5/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 05, 2013 DEPTH 9843' PRESENT OPERATION: RIH with Gyro TIME: 2359 hrs YESTERDAY 9843' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 1 6" HCC STX-1 5224897 3x20 / 0.9204 9831 9843 12 1-1-A-I-N-SE-BHA Done drilling cement 2 6" HCC MX-18HDX 5217224 3x14 / 0.4510 9843 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 9843' / 9835' MW 9.9 VIS 49 PV 14 YP 17 Gels 6/8/11 FL 6.3 FC 1/2 SOL 5.4 NAF/W 0.0/92.2 SD - MBT 1.0 pH 9.0 ALK 0.20 Cl- 30000 Ca+ 3120 MWD SUMMARY INTERVAL - TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY DAILY ACTIVITY SUMMARY Rig service. POOH from 9843’ to 6800’. TOOH; L/D BHA. Trips; P/U BHA L/D MWD; reprogram LWD. Condition mud and circulate; shallow pulse test at 250’, 235 GPM, 5.5 BBL. Trips, CON-RIH. Rig service. Trips, CON-RIH to 4649’. TIH from 4649’ to 9814’. Rig up gyro equipment; S/M. RIH with gyro. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/6/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 06, 2013 DEPTH 10001' PRESENT OPERATION: TOH to change mud motor angle TIME: 2359 hrs YESTERDAY 9843' 24 HOUR FOOTAGE 158' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 2 6" HCC MX-18HDX 5217224 3x14 / 0.04510 9843' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 131.8 @ 9869' 0.7 @ 9890' 33.2 31.24 FT/HR SURFACE TORQUE 2564 @ 9843' 2564 @ 9843' 16.2 0.00 FT-LBS WEIGHT ON BIT 26 @ 9998' 4 @ 9846' 14.3 17.61 KLBS ROTARY RPM 40 @ 9843' 2 @ 9914' 0.3 0.00 RPM PUMP PRESSURE 2207 @ 9982' 1339 @ 9845' 1985.5 2015.87 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10001' / 9993' MW 9.65 VIS 47 PV 11 YP 16 Gels 5/7/8 FL 5.3 FC 1/2 SOL 4.4 NAF/W 0.0/93.2 SD - MBT 1.0 pH 8.9 ALK 0.40 Cl- 30000 Ca+ 3200 MWD SUMMARY INTERVAL 9843 TO TOOLS PDC bit on 1.8 degree mud motor with OnTrak GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 23 @ 9939' 0 @ 9845' 3.5 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 4625 @ 9939' 152 @ 9895' 655.0 CONNECTION GAS HIGH ETHANE (C-2) 145 @ 9939' 0 @ 9949' 12.1 CONNECTION GAS: AVG PROPANE (C-3) 90 @ 9939' 0 @ 9949' 7.6 CONNECTION GAS: CURRENT 0 u BUTANE (C-4) 17 @ 10000' 2 @ 9993' 0.5 CURRENT AVG BACKGROUND 0 u PENTANE (C-5) 0 @ 10001' 0 @ 10001' 0.0 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, tuffaceous sandstone, tuffaceous claystone, and minor tuff PRESENT LITHOLOGY Loose sand, tuffaceous sandstone, tuffaceous claystone, tuff DAILY ACTIVITY SUMMARY Orient gyro tool. Slide/drill cement from 9843’ to 9880’. Drill actual / slide drilling from 9880’ to 9889’. Deviation survey; reinitiate gyro; and wire side entry sub pack off. Drill actual / slide drilling from 9889’ to 10,001’. Deviation survey / gyro confirmation. Condition mud and circulate; work pipe while waiting on orders. Trips / JSA to POOH, R/D wireline, gyro. Rig down wireline and gyro equipment. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/7/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 07, 2013 DEPTH 10150' PRESENT OPERATION: Drilling/Sliding TIME: 2359 hrs YESTERDAY 10001' 24 HOUR FOOTAGE 149' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 9940' 11.65 320.15 9931.52' 9990' 17.74 320.33 9979.87' 10014' 21.46 318.57 10002.47' 10053' 27.97 319.12 10037.88' 10077' 31.53 321.75 10058.72' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 2 6" HCC MX-18HDX 5217224 3x14 / 0.04510 9843' 10001' 158' 7.7 Change Angle 2RR 6" HCC MX-18HDX 5217224 3x14 / 0.04510 10001' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 193.6 @ 10062' 2.5 @ 10120' 48.3 129.03 FT/HR SURFACE TORQUE 1592 @ 10139' 899 @ 10138' 115.1 0.00 FT-LBS WEIGHT ON BIT 28 @ 10049' 2 @ 10075' 17.9 19.26 KLBS ROTARY RPM 40 @ 10131' 39 @ 10137' 3.8 0.00 RPM PUMP PRESSURE 2063 @ 10056' 1183 @ 10125' 1815.1 1974.75 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10144' / 10112' MW 9.5 VIS 47 PV 13 YP 16 Gels 6/8/9 FL 5.0 FC 1/2 SOL 3.6 NAF/W 0.0/93.8 SD - MBT 1.0 pH 9.6 ALK 1.2 Cl- 32000 Ca+ 3400 MWD SUMMARY INTERVAL 10001' TO TOOLS PDC bit on 2.1 degree mud motor with OnTrak GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 34 @ 10074' 1 @ 10003' 8.7 TRIP GAS 47 u CUTTING GAS 0 @ 10150' 0 @ 10150' 0.0 WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 3785 @ 10074' 154 @ 10003' 1169.3 CONNECTION GAS HIGH 18 u ETHANE (C-2) 285 @ 10074' 2 @ 10142' 63.0 CONNECTION GAS: AVG 13 u PROPANE (C-3) 239 @ 10080' 7 @ 10007' 55.7 CONNECTION GAS: CURRENT BUTANE (C-4) 167 @ 10080' 0 @ 10007' 30.4 CURRENT AVG BACKGROUND 4 u PENTANE (C-5) 80 @ 10080' 1 @ 10128' 12.5 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, conglomeratic sand, tuffaceous siltstone PRESENT LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, tuffaceous claystone, and minor tuff DAILY ACTIVITY SUMMARY POOH from 9820’ to 149’. L/D subs; download data from MWD; check motor bearings; inspect bit. Adjust degree of motor; M/U subs; M/U directional BHA. Trips; RIH with 2.1 degree motor (RIh slow). Drill actual, slide drilling from 10001’ to 10072’ @ 250 GPM, 18/20K WOB. Slide from 10072’ to 10125’. Rotate from 10125’ to 10139’. Slide ahead. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/8/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Greco, Grubb, Pederson DATE: Aug 08, 2013 DEPTH 10435' PRESENT OPERATION: Drilling ahead TIME: 2359 hrs YESTERDAY 10150' 24 HOUR FOOTAGE 285 CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10267' 53.15 321.70 10196.03' 10302' 58.47 321.02 10215.69' 10331' 62.77 320.22 10229.92' 10367' 66.96 319.58 10245.21' 10393 68.17 321.10 10255.13' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 2RR 6" HCC MX-18HDX 5217224 3x14 / 0.04510 10001' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 7157.9 @ 10204' 0.7 @ 10310' 96.0 10.80 FT/HR SURFACE TORQUE 3664 @ 10423' 400 @ 10204' 697.9 2809.82 FT-LBS WEIGHT ON BIT 126 @ 10322' 1 @ 10231' 17.4 12.83 KLBS ROTARY RPM 52 @ 10434' 1 @ 10378' 14.1 52.24 RPM PUMP PRESSURE 2090 @ 10200' 1626 @ 10311' 1806.9 1817.94 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10440' / 10269' MW 9.25 VIS 48 PV 12 YP 18 Gels 5/7/8 FL 4.0 FC 1/2 SOL 2.9 NAF/W 0.0/94.6 SD - MBT 1.0 pH 9.3 ALK 1.9 Cl- 30000 Ca+ 2800 MWD SUMMARY INTERVAL 10001' TO TOOLS PDC bit on 2.1 degree mud motor with OnTrak GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 225 @ 10201' 0 @ 10267' 53.6 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 16499 @ 10217' 4 @ 10265' 3882.9 CONNECTION GAS HIGH 62 u ETHANE (C-2) 2684 @ 10185' 0 @ 10265' 522.8 CONNECTION GAS: AVG 23 u PROPANE (C-3) 3125 @ 10185' 0 @ 10267' 596.2 CONNECTION GAS: CURRENT 62 u BUTANE (C-4) 1990 @ 10185' 0 @ 10267' 392.4 CURRENT AVG BACKGROUND 25 u PENTANE (C-5) 1989 @ 10180' 0 @ 10267' 185.0 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY Tuffaceous siltstone, tuffaceous claystone, loose sand, tuffaceous sandstone DAILY ACTIVITY SUMMARY Slide from 10140’ to 10193’. Rotate from 10193’ to 10205’. Slide from 10205’ to 10230’. Rotate from 10230’ to 10245’. Slide from 10245’ to 10255’. Rig service. Slide from 10255’ to 10270’. Drill actual; slide drill from 10270’ to 10300’. Condition mud and circulate. Drop mud weight from 9.5 to 9.2 (in, out). Rig service; blocks crown, top drive, draw tool, monitor well. Drill actual; slide drill from 10300’ to 10345’; back ream full stand @ 43 RPM; 12/18K on bit. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/9/2013 file://C:\Documents and Settings\EpochAdmin\Desktop\20130808.htm Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 09, 2013 DEPTH 10509' PRESENT OPERATION: Testing BOPs TIME: 2359 hrs YESTERDAY 10435' 24 HOUR FOOTAGE 74' CASING INFORMATION 7' @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10331' 62.77 320.22 10229.92' 10367' 66.96 319.58 10245.21' 10393' 68.17 321.10 10255.13' 10431' 68.16 321.38 10269.26' 10454' 69.89 322.08 10277.50' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 2RR 6" HCC MX-18HDX 52217224 3x14 / 0.04510 10001' 10509' 508' 24.7 6/6-WT/A-E/I-ER/HR Hours/BOP test DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 127.8 @ 10449' 0.2 @ 10436' 16.3 19.10 FT/HR SURFACE TORQUE 4191 @ 10482' 27 @ 10485' 2226.7 3727.08 FT-LBS WEIGHT ON BIT 37 @ 10486' 7 @ 10470' 21.5 20.40 KLBS ROTARY RPM 55 @ 10483' 13 @ 10458' 44.7 48.80 RPM PUMP PRESSURE 1951 @ 10444' 1621 @ 10447' 1815.3 1788.19' PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10509' / 10294' MW 9.2 VIS 47 PV 10 YP 17 Gels 5/6/7 FL 4.0 FC 1/2 SOL 2.9 NAF/W 0.0/94.6 SD - MBT 1.0 pH 9.0 ALK 2.00 Cl- 30000 Ca+ 2400 MWD SUMMARY INTERVAL 10001' TO 10509' TOOLS PDC bit on 2.1 degree mud motor with OnTrak GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 46 @ 10446' 7 @ 10503' 22.1 TRIP GAS CUTTING GAS 0 @ 10509' 0 @ 10509' 0.0 WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 4984 @ 10501' 749 @ 10485' 2186.6 CONNECTION GAS HIGH 50 u ETHANE (C-2) 280 @ 10446' 34 @ 10485' 124.9 CONNECTION GAS: AVG 50 u PROPANE (C-3) 330 @ 10501' 30 @ 10485' 144.3 CONNECTION GAS: CURRENT BUTANE (C-4) 227 @ 10501' 26 @ 10485' 103.2 CURRENT AVG BACKGROUND 2 u PENTANE (C-5) 131 @ 10458' 20 @ 10503' 61.5 HYDROCARBON SHOWS Fair to moderate oil show from 10180' to 10435' INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 1: 10180'-10435' has fair to moderate show. 1: Interval starts with a strong rating, where tuffaceous sandstone and loose sand dominate above the carbonaceous shale. Tuffaceous sandstone, conglomerate sand, and sand make up majority of interval and accompanies consistent fair oil ratings. Tuffaceous siltstone becomes most prominent from 10370' to 10435'; oil rating increases with increase in loose sand. 1: Interval starts with the high gas peak of 215 units. The rest of the interval has an average of 40-60 units, with peaks up to 100-120 units. 1: No visible oil stain, very slight to moderate odor, 70-90% sample fluorescence, moderate to immediate yellow to bright yellow milky cut fluorescence, moderate to bright yellow residual ring fluorescence, no visible residue. Where oil rating is fairly low, cut fluorescence was minimal, but there was a faint residual ring fluorescence. LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY Tuffaceous siltstone, loose sand, tuff, tuffaceous sandstone, sandstone DAILY ACTIVITY SUMMARY Rotate from 10396’ to 10446’. Slide from 10446’ to 10469’. Rotate from 10469’ to 10483’. Slide from 10483’ to 10487’. Rotate from 10487’ to 10500’. Rig service. Rotate from 10500’ to 10509’. Condition mud and circulate and reciprocate. Trips; POOH from 10509’ to 9787’; flow check; monitor well (no flow). Condition mud and circulate; pump dry job. Trips; continue POOH from 9787’ to MWD. Download MWD date; L/D directional tools. Pull wear bushing; install test plug. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/10/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 10, 2013 DEPTH 10509' PRESENT OPERATION: TIH while MAD-pass TIME: 2359 hrs YESTERDAY 10509' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10331' 62.77 320.22 10229.92' 10367' 66.96 319.58 10245.21' 10393' 68.17 321.10 10255.13' 10431' 68.16 321.38 10269.26' 10454' 69.89 322.08 10277.50' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HCC #5 DP505FX 7137570 5x11 / 0.4640 10509 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - FT/HR SURFACE TORQUE - @ - @ - FT-LBS WEIGHT ON BIT - @ - @ - KLBS ROTARY RPM - @ - @ - RPM PUMP PRESSURE - @ - @ - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD MW 9.2 VIS 41 PV 9 YP 15 Gels 5/7/8 FL 4.6 FC 1/2 SOL 3.0 NAF/W 0.0/94.6 SD - MBT 1.0 pH 8.6 ALK 2.00 Cl- 29000 Ca+ 2400 MWD SUMMARY INTERVAL 10509' TO TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS 620 u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 35 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonacoues shale, coal PRESENT LITHOLOGY Tuffaceous siltstone, loose sand, tuff, tuffaceous sandstone, sandstone DAILY ACTIVITY SUMMARY Test BOPs. Set wear bushing. L/D test joint. P/U BHA; change motor bend to 1.2; download tools. Fire drill; poor response; training in all alarms and drills. Continue directional BHA; load nuclear source; shallow pulse test. RIH with 1.2 degree motor to 9772’. Cut and slip 92’ of drill line. Rig service. Relog from 9850’ to 10509’ at 180 max ROP. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/11/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 11, 2013 DEPTH 10569' PRESENT OPERATION: Short trip and lube up TIME: 2359 hrs YESTERDAY 10509' 24 HOUR FOOTAGE 60' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10349' 64.18 319.55 10237.96' 10412' 64.89 320.45 10265.05' 10453' 64.80 321.09 10282.47' 10475' 64.73 321.75 10291.85' 10507' 64.77 320.83 10305.50' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HCC #5 DP505FX 7137570 5x11 / 0.4640 10349' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 172.1 @ 10511' 2.3 @ 10512' 40.5 10.86 FT/HR SURFACE TORQUE 4195 @ 10522' 2232 @ 10532' 1702.6 0.00 FT-LBS WEIGHT ON BIT 25 @ 10556' 2 @ 10527' 7.5 10.69 KLBS ROTARY RPM 48 @ 10509' 6 @ 10535' 24.1 0.00 RPM PUMP PRESSURE 2022 @ 10520' 1361 @ 10561' 1651.6 1468.65 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10569' / 10332' MW 9.2 VIS 42 PV 9 YP 17 Gels 5/7/8 FL 4.6 FC 1/2 SOL 3.0 NAF/W 0.0/94.6 SD - MBT 1.0 pH 8.8 ALK 1.60 Cl- 28500 Ca+ 2400 MWD SUMMARY INTERVAL 10349' TO TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 58 @ 10541' 4 @ 10569.00000 22.5 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 6184 @ 10541' 465 @ 10552' 2092.2 CONNECTION GAS HIGH ETHANE (C-2) 555 @ 10541' 58 @ 10552' 166.0 CONNECTION GAS: AVG PROPANE (C-3) 706 @ 10541' 57 @ 10552' 212.2 CONNECTION GAS: CURRENT BUTANE (C-4) 392 @ 10541' 31 @ 10552' 118.5 CURRENT AVG BACKGROUND 8 u PENTANE (C-5) 235 @ 10541' 5 @ 10562' 65.1 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY Tuffaceous siltstone, loose sand, tuffaceous claystone, tuffaceous sandstone DAILY ACTIVITY SUMMARY Tight hole / washdown from 10349’ to 10409’. Directional work; MAD pass; W/R from 10409’ to 10509’. Drill actual from 10509’ to 10557’. Slide from 10557’ to 10566’. Spot lube pill and reciprocate pipe. Slide from 10566’ to 10569’. Short trip 6 stands two times from 10569’ to 10221’. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/12/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 12, 2013 DEPTH 10569' PRESENT OPERATION: Circulating B/U at 10569' TIME: 2359 hrs YESTERDAY 10509' 24 HOUR FOOTAGE 60' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10349' 64.18 319.55 10237.96' 10412' 64.89 320.45 10265.05' 10453' 64.80 321.09 10282.47' 10475' 64.73 321.75 10291.85' 10507' 64.77 320.83 10305.50' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3 6" HCC #5 DP505FX 7137570 5x11 / 0.4640 10349' 10569' 220' 4.0 1-1-WT-A-X-I-BT-BHA BHA 4 6" HCC #6 MX-18HDX 5217225 3x14 / 0.4510 10569' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 172.1 @ 10511' 2.3 @ 10512' 40.5 10.86 FT/HR SURFACE TORQUE 4195 @ 10522' 2232 @ 10532' 1702.6 0.00 FT-LBS WEIGHT ON BIT 25 @ 10556' 2 @ 10527' 7.5 10.69 KLBS ROTARY RPM 48 @ 10509' 6 @ 10535' 24.1 0.00 RPM PUMP PRESSURE 2022 @ 10520' 1361 @ 10561' 1651.6 1468.65 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10570' / 10333' MW 9.25 VIS 40 PV 9 YP 17 Gels 5/6/7 FL 4.8 FC 1/2 SOL 3.3 NAF/W 0.0/94.3 SD - MBT 1.0 pH 8.5 ALK 1.40 Cl- 29000 Ca+ 2400 MWD SUMMARY INTERVAL 10569' TO TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 58 @ 10541' 4 @ 10569' 22.5 TRIP GAS 544 u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 6184 @ 10541' 465 @ 10552' 2092.2 CONNECTION GAS HIGH ETHANE (C-2) 555 @ 10541' 58 @ 10552' 166.0 CONNECTION GAS: AVG PROPANE (C-3) 706 @ 10541' 57 @ 10552' 212.2 CONNECTION GAS: CURRENT BUTANE (C-4) 392 @ 10541' 31 @ 10552' 118.5 CURRENT AVG BACKGROUND 12 u PENTANE (C-5) 235 @ 10541' 5 @ 10562' 65.1 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, looze sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY Tuffaceous siltstone, loose sand, tuffaceous claystone. tuffaceous sandstone DAILY ACTIVITY SUMMARY Circulate bottoms up; reciprocate pipe. POOH from 10569 to 7000’. Trips; TOOH from 7000’ to 292’. Directional work; L/D BHA, unload nuke, DN link tools. Directional work; P/U new mud motor, orient, load nukes. Condition mud and circulate; shallow pulse test (test good). Trips from surface to 2929’. Trips from 2929’ to 10569’; circulate B/U. Drill/slide ahead. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/13/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 13, 2013 DEPTH 10602' PRESENT OPERATION: RIH after regaining circ. and circulating B/U TIME: 2359 hrs YESTERDAY 10569' 24 HOUR FOOTAGE 33' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10349' 64.18 319.55 10237.96' 10412' 64.89 320.45 10265.05' 10453' 64.80 321.09 10282.47' 10475' 64.73 321.75 10291.85' 10507' 64.77 320.83 10305.50' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" HCC #6 MX-18HDX 5217225 3x14 / 0.4510 10569' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 66.5 @ 10592' 2.9 @ 10597' 18.1 14.27 FT/HR SURFACE TORQUE 4921 @ 10592' 709 @ 10574' 1190.0 0.00 FT-LBS WEIGHT ON BIT 23 @ 10579' 6 @ 10597' 15.6 10.27 KLBS ROTARY RPM 40 @ 10591' 10 @ 10582' 10.0 0.00 RPM PUMP PRESSURE 2256 @ 10589' 1468 @ 10569' 1953.6 1483.49 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10570' / 10333' MW 9.35 VIS 40 PV 9 YP 16 Gels 5/6/7 FL 5.0 FC 1/2 SOL 3.3 NAF/W 0.0/94.3 SD - MBT 1.0 pH 8.5 ALK 1.40 Cl- 29000 Ca+ 2400 MWD SUMMARY INTERVAL 10569' TO TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 28 @ 10576' 3 @ 10601' 10.2 TRIP GAS CUTTING GAS @ @ WIPER GAS 5910 u CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 1708 @ 10576' 257 @ 10569' 480.2 CONNECTION GAS HIGH ETHANE (C-2) 142 @ 10576' 26 @ 10569' 42.0 CONNECTION GAS: AVG PROPANE (C-3) 153 @ 10576' 28 @ 10569' 44.2 CONNECTION GAS: CURRENT BUTANE (C-4) 98 @ 10576' 12 @ 10569' 30.1 CURRENT AVG BACKGROUND 45 u PENTANE (C-5) 79 @ 10576' 12 @ 10569' 26.0 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, loose sand, tuffaceous siltstone, conglomerate sand, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY NO RETURNS... Tuffaceous siltstone, tuffaceous claystone, loose sand, tuffaceous sandstone before lost returns DAILY ACTIVITY SUMMARY Slide from 10568’ to 10588’. Rotate from 10588’ to 10593’. Hole taking mud; idle pump and send LCM down hole. Rotate from 10593’ to 10599’. Slide from 10599’ to 10602’; drilling with partial returns. Lost returns; pump LCM; build 30 lbs LCM in active; work to re-establish returns; reciprocate pipe. Condition mud and circulate; lost circ; work pipe; spot pills on bottom; pump 30 BBL down backside. Condition mud and circulate; drop ball shift well commander; break circulation; pump 20 BBL. Condition mud and circulate; break circulation @ 4 BBL, pump 2nd 80 lb BBL pill. Trips; stand back 2 stands while pill soaks. Condition mud and circulate; pump down backside with holefill. Regain circulation; circulate bottoms up; 5910 units of gas. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/14/2013 file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\H ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 14, 2013 DEPTH 10824' PRESENT OPERATION: Troubleshooting MWD tools TIME: 2359 hrs YESTERDAY 10602' 24 HOUR FOOTAGE 222' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10507' 64.77 320.83 10305.50' 10537' 64.88 321.53 10318.26' 10602' 68.99 324.03 10343.73' 10662' 69.97 325.09 10364.76' 10725' 72.06 324.80 10385.25' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" HCC #6 MX-18HDX 5217225 3x14 / 0.4510 10569' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 141.0 @ 10752' 1.3 @ 10820' 26.5 20.89 FT/HR SURFACE TORQUE 9118 @ 10818' 63 @ 10797' 2472.7 1376.42 FT-LBS WEIGHT ON BIT 52 @ 10771' 0 @ 10684' 17.2 32.62 KLBS ROTARY RPM 51 @ 10756' 1 @ 10771' 31.6 0.00 RPM PUMP PRESSURE 2131 @ 10817' 1407 @ 10691' 1783.5 1822.33 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10823' / 10413' MW 9.3 VIS 42 PV 9 YP 18 Gels 6/7/8 FL 4.8 FC 1/2 SOL 3.7 NAF/W 0.0/94.0 SD - MBT 1.0 pH 9.3 ALK 0.80 Cl- 28500 Ca+ 2400 MWD SUMMARY INTERVAL 10569' TO TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 545 @ 10607' 8 @ 10602' 115.2 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 19626 @ 10683' 162 @ 10602' 2719.7 CONNECTION GAS HIGH ETHANE (C-2) 2126 @ 10686' 21 @ 10658' 184.6 CONNECTION GAS: AVG 11 u PROPANE (C-3) 3383 @ 10606' 52 @ 10770' 276.7 CONNECTION GAS: CURRENT 18 u BUTANE (C-4) 6169 @ 10607' 36 @ 10794' 363.1 CURRENT AVG BACKGROUND 50 u PENTANE (C-5) 5289 @ 10607' 32 @ 10801' 477.8 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, loose sand, conglomerate sand, tuffaceous siltstone, tuff, tuffaceous claystone, carbonaceous shale, coal PRESENT LITHOLOGY Sandstone, tuff, tuffaceous sandstone, loose sand DAILY ACTIVITY SUMMARY Dropped ball to deactivate well commander. TIH 5 stands from 10341’ to 10585’; tag fill @ 10585’; wash down to bottom from 10585’ to 10602’. Slide from 10602’ to 10620’. Drill from 10620’ to 10625’. Perform BOP drill (well secured in 45 seconds). Drill from 10625’ to 10716’. Rig service. Drill from 10716’ to 10782’. Drill from 10782 to 10824’. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/15/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 15, 2013 DEPTH 10824' PRESENT OPERATION: TIH after fixing MWD tools TIME: 2359 hrs YESTERDAY 10824' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10507' 64.77 320.83 10305.50' 10537' 64.88 321.53 10318.26' 10602' 68.99 324.03 10343.73' 10662' 69.97 325.09 10364.76' 10725 72.06 324.80 10385.25' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 4 6" HCC #6 MX-18HDX 5217225 3x14 / 0.4510 10569' 10824' 255' 14.1 1-1-WT-A-E-I-ER-DTF DTF 5 6" HCC #7 MX-18HDX 5217177 3x14 / 0.4510 10824' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 10823' / 10413' MW 9.2 VIS 39 PV 7 YP 17 Gels 5/6/7 FL 4.8 FC 1/2 SOL 3.1 NAF/W 0.0/94.5 SD - MBT 1.0 pH 8.5 ALK 0.50 Cl- 29000 Ca+ 2400 MWD SUMMARY INTERVAL 10824' TO TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 10 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Tuffaceous sandstone, loose sand, conglomerate sand, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY Sandstone, tuff, tuffaceous sandstone, loose sand DAILY ACTIVITY SUMMARY Troubleshoot MWD; tool quit pulsing. Rig service; greased DW; check oil. Build a dry job and prep rig floor to TOH. TOH from 10824’ to 9844’. Clean floor; pump dry job. TOH from 9844’ to 8041’. Bit hours = 14.1 hours. TOH from 8041’ to directional tools. Unload radioactive sources/ L/W Monel; D/L data; P/U Monel; M/U new bit scribe motor; upload data. Finish loading data; pull and clean filter; M/U Monel; S/M with MWD before loading R/A sources; load R/A sources; surface test MWD tool. TIH from 349’ to 9000’; slip and cut 55’ drill line. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/16/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 16, 2013 DEPTH 11029' PRESENT OPERATION: Soaking LCM pills and building mud volume TIME: 2359 hrs YESTERDAY 10824' 24 HOUR FOOTAGE 205' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10662' 69.97 325.09 10364.76' 10725' 72.06 324.80 10385.25' 10787' 73.65 326.84 10403.53' 10851' 77.08 325.30 10419.70' 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 5 6" HCC #7 MX-18HDX 5217177 3x14 / 0.4510 10824' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 229.4 @ 10857' 1.1 @ 10864' 43.6 11.25 FT/HR SURFACE TORQUE 9432 @ 10924' 1376 @ 10824' 7037.0 7959.46 FT-LBS WEIGHT ON BIT 52 @ 10864' 6 @ 10963' 19.5 14.07 KLBS ROTARY RPM 61 @ 11029' 42 @ 10843' 45.7 61.44 RPM PUMP PRESSURE 2280 @ 10923' 1822 @ 10824' 2181.1 2093.18 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11029' / 10455' MW 9.2 VIS 39 PV 7 YP 17 Gels 5/6/7 FL 5.0 FC 1/2 SOL 3.2 NAF/W 0.0/94.5 SD - MBT 1.0 pH 8.5 ALK 0.40 Cl- 28000 Ca+ 2400 MWD SUMMARY INTERVAL 10824' TO TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 112 @ 10991' 13 @ 10919' 54.7 TRIP GAS 237 u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 14865 @ 10991' 518 @ 10826' 5881.4 CONNECTION GAS HIGH 26 u ETHANE (C-2) 773 @ 10966' 24 @ 10826' 218.3 CONNECTION GAS: AVG 22 u PROPANE (C-3) 572 @ 10967' 32 @ 10826' 215.1 CONNECTION GAS: CURRENT 18 u BUTANE (C-4) 352 @ 10967' 19 @ 10826' 115.7 CURRENT AVG BACKGROUND 0 u PENTANE (C-5) 288 @ 10966' 12 @ 10829' 55.0 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY Conglomerate sand, tuff, conglomerate DAILY ACTIVITY SUMMARY Slip and cut 55’ of drill line. Rig service; greased TD, DW, blocks, swivel; checked oil in DW, gens, and MP. TIH from 9015’ to 10000’. TIH from 10000’ to 10824’. Drill from 10824’ to 11029’. Lost circulation. Build LCM pill; pump 20 BBL of LCM. Build and pump second LCM pill. TOH from 11029’ to 10967’; 2 stands of DP. Let pill soak. Fill both sides of hole with 71 BBL of mud. Build 80 lb per BBL LCM pill; drop commander ball #1; drop commander ball #2. TIH from 10967’ to 11029’; 2 stands of DP. Pump 80 lb per BBL LCM pill. TOH from 11029 to 10967’. Let 80 lb per BBL LCM pill soak; build volume. Try to fill hole with 77 BBL of mud. Build 110 lb per BBL LCM pill. Pump 22 BBL of pill and chase with 120 BBL. Wait on pill to soak. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/17/2013 file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\H ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 17, 2013 DEPTH 11029' PRESENT OPERATION: TOH for BOP test TIME: 2359 hrs YESTERDAY 11029' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10662' 69.97 325.09 10364.76' 10725' 72.06 324.80 10385.25' 10787' 73.65 326.84 10403.53' 10851' 77.08 325.30 10419.70' 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 5 6" HCC #7 MX-18HDX 5217177 3x14 / 0.4510 10824' 11029' 205' 6.7 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11029' / 10455' MW 9.2 VIS 41 PV 8 YP 15 Gels 5/6/7 FL 4.8 FC 1/2 SOL 3.2 NAF/W 1.0/93.5 SD - MBT 1.0 pH 8.1 ALK 0.40 Cl- 28500 Ca+ 2000 MWD SUMMARY INTERVAL 10824' TO TOOLS Tri-cone roller bit on 1.4 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS 6668 u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 500 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY Conglomerate sand, tuff, conglomerate DAILY ACTIVITY SUMMARY Try to fill back side with 75 BBL; no sign. Build 110 lb pr BBL LCM pill. Pump 19 BBL of 110 lb per BBL LCM pill; chase with 120 BBL; RIH 1 stand of DP. TOH 7 stands from 11029’ to 10524’/ Let LCM pill soak in formation; build mud volume and LCM pill. TIH from 10553’ to 11029’ Pump LCM pill and chase with 1300 strokes; had returns cut with oil; continue CBU; close bag; continue circulating through choke/gas buster (surface to surface = 7500 strokes). Shut down pump; closed choke monitor for pressure. TOH 19 stands. Monitor well with trip tank. Circulate surface to surface. Drop well commander ball to close up circulating sub; dropped second ball to open circulating sub. Try to open well commander @ 3300 PSI with no luck. TOH from 9824’. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/18/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 18, 2013 DEPTH 11029' PRESENT OPERATION: TIH to drill ahead TIME: 2359 hrs YESTERDAY 11029' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10662' 69.97 325.09 10364.76' 10725' 72.06 324.80 10385.25' 10787' 73.65 326.84 10403.53' 10851' 77.08 325.30 10419.70' 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 5 6" HCC #7 MX-18HDX 5217177 3x14 / 0.4510 10824' 11029' 205' 6.7 1-1-WT-A-E-I BOP test 6 6" HCC #8 DP505FX 7034965 5x11 / 0.4640 11029' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11029' / 10455' MW 9.2 VIS 46 PV 10 YP 15 Gels 6/7/8 FL 4.8 FC 1/2 SOL 3.3 NAF/W 1.0/93.5 SD - MBT 1.0 pH 8.6 ALK 0.30 Cl- 27500 Ca+ 2000 MWD SUMMARY INTERVAL 11029' TO TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 440 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY Conglomerate sand, tuff, conglomerate DAILY ACTIVITY SUMMARY Continue TOH. Directional work; break apart commander sub and lay out monels. S/M with LWD and rig crew before unloading radioactive sources. Directional work; unload sources and down link MWD tool; drain motor; break off bit. P/U test joint and remove wear bushing/flush through stack and lines. Conduct BOP tests. Install wear bushing. P/U directional tools. S/M with rig crew and DD. Directional work; M/U bit motor scribe and make up MWD. S/M with LWD and rig crew for radioactive sources. Directional work; load radioactive sources and finish making up BHA and shallow test MWD. TIH from 175’. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/19/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 19, 2013 DEPTH 11067' PRESENT OPERATION: Soaking LCM pills TIME: 2359 hrs YESTERDAY 11029' 24 HOUR FOOTAGE 38' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10662' 69.97 325.09 10364.76' 10725' 72.06 324.80 10385.25' 10787' 73.65 326.84 10403.53' 10851' 77.08 325.30 10419.70' 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 6 6" HCC #8 DP505FX 7034965 5x11 / 0.4640 11029' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 195.1 @ 11047' 11.2 @ 11029' 100.7 112.09 FT/HR SURFACE TORQUE 7959 @ 11029' 5782 @ 11041' 7111.7 7132.64 FT-LBS WEIGHT ON BIT 14 @ 11029' 1 @ 11046' 3.9 6.91 KLBS ROTARY RPM 61 @ 11029' 51 @ 11032' 53.8 52.39 RPM PUMP PRESSURE 2093 @ 11029' 563 @ 11041' 1089.9 1371.16 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11029' / 10455' MW 9.2 VIS 46 PV 8 YP 15 Gels 5/6/7 FL 4.2 FC 1/2 SOL 3.4 NAF/W 0.1/94.0 SD - MBT 1.0 pH 9.4 ALK 0.50 Cl- 30500 Ca+ 800 MWD SUMMARY INTERVAL 11029' TO TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS 1994 u CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before lost circulation at 11029' DAILY ACTIVITY SUMMARY Condition mud and circulate bottoms up. TIH from 10026’ to 10595’. Condition mud and circulate; wash ream tight spot at 10603’. TIH from 10594’ to 11029’. Lose returns while TIH. Drill from 11029’ to 11036’. Build and pump 23 BBL LCM pill and chase with 2229 strokes. TOH 2 stands. Let LCM pill soak; pumped 54 BBL on back side; build volume. RIH from 10880’ to 11036’. Drill from 11036’ to 11067’. TOH from 11067’ to 10877’. Pump 23 BBL of LCM pill and chase with 2200 strokes. Let LCM pill soak; build volume. Drop ball to open well commander; drop second ball to isolate BHA. Total mud loss = 784 BBL. Pump 21 BBL of 80 lb per BBL LCM pill; chase with 128 BBL. TOH from 10887’ to 10625’. Wait on LCM pill to soak into formation; build volume. Pump 40 BBL down DP and 25 BBL down backside to try to fill hole. Build 80 lb per BBL LCM pill. Pump 25 BBL of 80 lb per BBL LCM pill; chase with 128 BBL. TOH from 10954’ to 10686’. Let pill soak into formation. Pump 25 BBL down back side of hole and 45 BBL down DP; no returns. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/20/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 20, 2013 DEPTH 11099' PRESENT OPERATION: Building mud volume TIME: 2359 hrs YESTERDAY 11067' 24 HOUR FOOTAGE 32' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10662' 69.97 325.09 10364.76' 10725' 72.06 324.80 10385.25' 10787' 73.65 326.84 10403.53' 10851' 77.08 325.30 10419.70' 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 6 6" 6" HCC #8 DP505FX 7034965 5x11 / 0.4640 11029' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 220 @ 11069' 50.4 @ 11097' 158.2 199.67 FT/HR SURFACE TORQUE 8433 @ 11096' 6324 @ 11068' 7580.6 7918.16 FT-LBS WEIGHT ON BIT 14 @ 11097' 3 @ 11069' 8.1 9.77 KLBS ROTARY RPM 54 @ 11088' 52 @ 11067' 55.2 52.78 RPM PUMP PRESSURE 1575 @ 11099' 848 @ 11068' 1354.8 1575.54 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11099' / 10465' MW 8.9 VIS 49 PV 8 YP 15 Gels 5/6/7 FL 4.8 FC 1/2 SOL 1.7 NAF/W 0.0/96.0 SD - MBT 1.0 pH 8.6 ALK 0.50 Cl- 2800 Ca+ 200 MWD SUMMARY INTERVAL 11029' TO TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 0 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff and conglomerate before lost circulation at 11029' DAILY ACTIVITY SUMMARY Build volume and 110 lb per BBL LCM pill. Work tight spot at 10781’. Pump 20 BBL of 110 lb per BBL LCM pill and chase with 129 BBL; pressure reached 545 PSI. Let pill soak into formation; monitor well with trip tank. Pump down back side with trip tank and down DP. Build volume and 110 lb per BBL LCM pill. Build volume and 110 lb per BBL LCM pill. Drop ball to close well commander. RIH from 10628’ to 11067’. Drill from 11067’ to 11099’. Drop ball to open well commander; drop second ball to isolate BHA. Pump 21 BBL of 110 lb per BBL LCM pill; chase with 2200 strokes. Let LCM pill soak; build volume. Rig service (function pipe rams 4 seconds). Continue to let LCM pill soak while building mud volume. Pump 22 BBL of 11 lb per BBL LCM pill; chase with 2200 strokes. Let 110 lb per BBL LCM pill soak into formation. Pump 250 BBL down backside. Build volume. CANRIG PERSONNEL ON BOARD: Resch, Sherry, Hillegeist, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/21/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 21, 2013 DEPTH 11099' PRESENT OPERATION: Building LCM pills TIME: 2359 hrs YESTERDAY 11099' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10662' 69.97 325.09 10364.76' 10725' 72.06 324.80 10385.25' 10787' 73.65 326.84 10403.53' 10851' 77.08 325.30 10419.70' 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 6 6" HCC #8 DP505FX 7034965 5x11 / 0.4640 11029' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION - @ - @ - - FT/HR SURFACE TORQUE - @ - @ - - FT-LBS WEIGHT ON BIT - @ - @ - - KLBS ROTARY RPM - @ - @ - - RPM PUMP PRESSURE - @ - @ - - PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11099' / 10465' MW 8.9 VIS 46 PV 9 YP 15 Gels 7/8/10 FL 4.2 FC 1/2 SOL 1.7 NAF/W 2.0/94.0 SD - MBT 1.0 pH 8.2 ALK 0.40 Cl- 28500 Ca+ 200 MWD SUMMARY INTERVAL 11029' TO TOOLS PDC bit on 1.2 degree mud motor with OnTrak, BCPM, SDN, and circulating sub GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS - @ - @ - TRIP GAS 6460 u CUTTING GAS - @ - @ - WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) - @ - @ - CONNECTION GAS HIGH ETHANE (C-2) - @ - @ - CONNECTION GAS: AVG PROPANE (C-3) - @ - @ - CONNECTION GAS: CURRENT BUTANE (C-4) - @ - @ - CURRENT AVG BACKGROUND 300 u PENTANE (C-5) - @ - @ - HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale, coal PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before lost circulation at 11029' DAILY ACTIVITY SUMMARY Pump 75.5 BBL of 130 lb per BBL LCM pill. Received returns at 1681 strokes (97 BBL). Oil over shakers; shut in well at 5300 units of gas read; Max gas 6460 units; record pressures; circulate through choke. Circulate B/U. Monitor well. TOH 5 stands. Circulate gas out. Drop ball to close well commander. Troubleshoot MWD tool. TOH from 10664’ to 9765’. Troubleshoot MWD tool. TIH from 9767’ to 11099’; bridge at 11004’; lost circulation and returns. Build 3 120 lb per BBL LCM pill; monitor well from trip tank; pumped 50 BBL on backside with no returns. Dropped ball #1; pressured up to 1183 PSI. Dropped ball #2; pressured up to 1583 PSI. Pump 47.7 BBL of 120 lb per BBL LCM pill; chase with 127.5 BBL. CANRIG PERSONNEL ON BOARD: Sherry, Hillegeist, Grundin, Hudgins __DAILY COST: $3460 REPORT BY: Mike Sherry Page 1 of 1Daily Report 8/22/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 22, 2013 DEPTH 11161' PRESENT OPERATION: Drilling Blind TIME: 23:59 hrs YESTERDAY 11099' 24 HOUR FOOTAGE 62' CASING INFORMATION SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 6 6 hHHC #8 DP505FX 7034965 5x11/0.4640 11029' In Hole 132' 1.7 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 199.7 @ 11099' 56.6 @ 11125' 83.5 162.2 FT/HR SURFACE TORQUE 9206 @ 11129' 5220 @ 11134' 4950.7 7170.0 FT-LBS WEIGHT ON BIT 9 @ 11099' 0 @ 11141' 0.7 1.9 KLBS ROTARY RPM 56 @ 11134' 52 @ 11099' 38.1 55.1 RPM PUMP PRESSURE 2057 @ 11146' 1316 @ 11134' 1261.9 1811.1 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11099' MW 8.9 VIS 46 PV 9 YP 15 Gels 7/8/10 FL 4.2 FC 1/2 SOL 1.7 NAF/W 2.0/94.0 SD - MBT 1.0 pH 8.2 ALK 0.40 Cl- 28,500 Ca+ 200 MWD SUMMARY INTERVAL 11029' TO 11091' TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub (commo lost @ 11092'). GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 0 @ 11161' 0 @ 11161' 0.0 TRIP GAS 244u CUTTING GAS 0 @ 11161' 0 @ 11161' 0.0 WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 0 @ 11161' 0 @ 11161' 0.0 CONNECTION GAS HIGH ETHANE (C-2) 0 @ 11161' 0 @ 11161' 0.0 CONNECTION GAS: AVG PROPANE (C-3) 0 @ 11161' 0 @ 11161' 0.0 CONNECTION GAS: CURRENT BUTANE (C-4) 0 @ 11161' 0 @ 11161' 0.0 CURRENT AVG BACKGROUND 0u PENTANE (C-5) 0 @ 11161' 0 @ 11161' 0.0 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Pump 47.7 BBL of 120PPB LCM pill and chase with 127.5 BBL spot pill @ 10986'. Service rig and let pill soak into formation. Pump 17 BBL down back side with no returns. Build volume and 130 PPB lcm pill. RIH from 9764' to 11064'. Drop ball to close well commander.drill from 11099' to 11161'. Monitor well and build LCM pills. Drop ball to open well commander and drop second ball to isolate BHA. Pump 60 BBL of 130 PPB LCM pill and chase with 2200 strokes. TOOH from 11086' to 9766'. Let LCM pill soak into formation. TIH from 9766' to 11161'. Start drilling from 11161'. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 8/23/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 23, 2013 DEPTH 11397' PRESENT OPERATION: Testing BOP's TIME: 23:59 hrs YESTERDAY 11161' 24 HOUR FOOTAGE 236' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 6 6" HHC #8 DP505FX 7034965 5x11/0.4640 11029' In Hole 371' 2.45 No Survey DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 13941.2 @ 11370' 4.4 @ 11254' 406.4 7115.5 FT/HR SURFACE TORQUE 11025 @ 11355' 6203 @ 11364' 7227.8 7832.3 FT-LBS WEIGHT ON BIT 35 @ 11202' 1 @ 11161' 11.6 13.3 KLBS ROTARY RPM 56 @ 11382' 51 @ 11179' 52.7 54.1 RPM PUMP PRESSURE 3024 @ 11381' 1631 @ 11195' 2166.6 2167.0 PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11161' MW 8.9 VIS 52 PV 11 YP 14 Gels 7/8/9 FL 5.0 FC 1/2 SOL 1.6 NAF/W 0.0/96.0 SD MBT 1.0 pH 8.4 ALK 0.50 Cl- 29,000 Ca+ 200 MWD SUMMARY INTERVAL 11029' TO 11091' TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub (commo lost @ 11092'). GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS 0 @ 11397' 0 @ 11397' 0.0 TRIP GAS 78u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) 0 @ 11397' 0 @ 11397' 0.0 CONNECTION GAS HIGH 0u ETHANE (C-2) 0 @ 11397' 0 @ 11397' 0.0 CONNECTION GAS: AVG 0u PROPANE (C-3) 0 @ 11397' 0 @ 11397' 0.0 CONNECTION GAS: CURRENT 0u BUTANE (C-4) 0 @ 11397' 0 @ 11397' 0.0 CURRENT AVG BACKGROUND 0u PENTANE (C-5) 0 @ 11397' 0 @ 11397' 0.0 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Drilling ahead from 11161' to 11400' MD, circulate bottoms up, trip out of hole from 11400' to 10788', pump 100 BBL down backside, trip out of hole from 11788' to 9773', service rig and monitor well, slip and cut 156' of drill line, continue to service rig, fill back side with 200 BBL, trip out of hole from 9767' to 2606', fill backside with 450 BBL with no returns, trip out of hole and lay down bha and mwd tools. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 8/24/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 24, 2013 DEPTH 11397' PRESENT OPERATION: Circulating TIME: 23:59 hrs YESTERDAY 11397' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 6 6" HHC #8 DP505FX 7034965 5x11/0.4640 11029' 11400 371' 2.45 No Survey 6 RR1 6" HHC #8 DP505FX 7034965 5x11/0.4640 11400' In Hole 0 2.45 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400' MW 8.9 VIS 45 PV 11 YP 13 Gels 5/7/8 FL 4.6 FC 1/2 SOL 1.6 NAF/W 0.0/96.0 SD - MBT 1.0 pH 9.7 ALK 0.60 Cl- 29,000 Ca+ 120 MWD SUMMARY INTERVAL 11400' TO 11400' TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub. GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS 1193u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ CONNECTION GAS HIGH ETHANE (C-2) @ @ CONNECTION GAS: AVG PROPANE (C-3) @ @ CONNECTION GAS: CURRENT BUTANE (C-4) @ @ CURRENT AVG BACKGROUND PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Pull wear bushing, install test plug and make up test equipment, test annular and choke to 250psi and 2500psi, rig down test plug and test joint, install wear bushing, pick up tools-scribe motor and load data, run in hole to 11020', wash and ream from 11020' to 11069' and circulate out gas and oil, shut in well due to gas and oil and monitor pressure through choke, open well and pull 3 stands to get out of tight hole, shut in well and circulate through choke. Max gas last 24 hours 1193 units @ 11069'. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 8/25/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 25, 2013 DEPTH 11397' PRESENT OPERATION: Pulling Out Of Hole TIME: 23:59 hrs YESTERDAY 11397' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 6 RR1 6" HHC #8 DP505FX 7034965 5x11/0.4640 11400' 11400 0 2.45 TD DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400' MW 8.9 VIS 45 PV 11 YP 13 Gels 6/7/8 FL 5.4 FC 1/2 SOL 1.6 NAF/W 0.0/96.0 SD - MBT 1.0 pH 8.9 ALK 0.40 Cl- 29,000 Ca+ 120 MWD SUMMARY INTERVAL 11400' TO 11400' TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub. GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS 5172u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ CONNECTION GAS HIGH ETHANE (C-2) @ @ CONNECTION GAS: AVG PROPANE (C-3) @ @ CONNECTION GAS: CURRENT BUTANE (C-4) @ @ CURRENT AVG BACKGROUND PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Pull out of hole to 10879, shut in well and circulate through choke, shut in well and monitor pressure up to 40psi and circulate through choke, circulate bottoms up and monitor well for gas, shut in well and circulate surface to surface through choke, drop ball to open well commander and second ball to isolate BHA, run in hole 2 stands, pump 65 BBL 100 lbs/BBL LCM and chase with 2110 strokes, pull out of hole from 11006' to 9769', fill hole to monitor well with 10 BBL every half hour pumped 75 BBL down back side with no returns and continued to monitor well, pull out of hole from 9776' to 4968', monitored well for gas, pull out of hole from 4968' to 5984' at report time. Max gas last 24 hours 5172 units circulating @ 10877'. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 8/26/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 26, 2013 DEPTH 11397' PRESENT OPERATION: Make Up BHA TIME: 23:59 hrs YESTERDAY 11397' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 6 RR1 6" HHC #8 DP505FX 7034965 5x11/0.4640 11400' 11400 0 2.45 TD DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400' MW 8.9 VIS 60 PV 14 YP 14 Gels 5/6/7 FL 5.8 FC 1/2 SOL 1.5 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.6 ALK 0.60 Cl- 29,500 Ca+ 80 MWD SUMMARY INTERVAL 11400' TO 11400' TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub. GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS 240u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ CONNECTION GAS HIGH ETHANE (C-2) @ @ CONNECTION GAS: AVG PROPANE (C-3) @ @ CONNECTION GAS: CURRENT BUTANE (C-4) @ @ CURRENT AVG BACKGROUND PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Pull out of hole from 5984' to 4968', monitor well for gas, pull out of hole from 4968' to 2155', monitor well for gas, pull out of hole from 6155' to 200', lay down BHA and unload data sources, remove wear bushing, install test plug, test BOP's, lay down test joint and fill stack with water, rig up to test blind rams, do draw down test on accumulator, pull test plug and install wear bushing, blow down choke manifold and line up for hard shut in, service rig, making up BHA at report time. Max gas last 24 hours 240 units. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist, Grundin, Hudgins __DAILY COST: $3460.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 8/27/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson River Field DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 27, 2013 DEPTH 11397' PRESENT OPERATION: Washing and Reaming TIME: 23:59 hrs YESTERDAY 11397' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.21 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 6 RR1 6" HHC #8 DP505FX 7034965 5x11/0.4640 11400' 11400 0 2.45 TD 7 6" MX-18HDX 5217177 3x14/0.4510 11400' In Hole 0 0 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400' MW 8.9 VIS 60 PV 13 YP 14 Gels 5/6/7 FL 5.4 FC 1/2 SOL 1.6 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.4 ALK 0.50 Cl- 29,000 Ca+ 80 MWD SUMMARY INTERVAL 11400' TO 11400' TOOLS PDC bit on 1.2 degree mud motor with On Trak, BCPM, SDN, and circulating sub. GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS 2347u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ CONNECTION GAS HIGH ETHANE (C-2) @ @ CONNECTION GAS: AVG PROPANE (C-3) @ @ CONNECTION GAS: CURRENT BUTANE (C-4) @ @ CURRENT AVG BACKGROUND PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglomerate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS... Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Trip in hole to 10170', circulate gas out through choke, shut in well and monitor casing pressure, open well and circulate bottoms up, wash and ream from 10169' to 10390' taking 15Klbs WOB, work free and circulate, trip out of hole to 10136' and circulate, wash and ream from 10166' to 10634' at report time. Max gas last 24 hours 2347 units. CANRIG PERSONNEL ON BOARD: n test joint and fill stack with waStrawn, Hillegeist, Grundin, Hudginster, rig up to test blind rams, do draw down test on accumulator, pull test plug and install wear bushing, blow down choke manifold and line up for hard shut in, service rig, making up BHA at report time. Max gas last 2 __DAILY COST: $3460.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 8/28/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson RiverField DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 28, 2013 DEPTH 11397' PRESENT OPERATION: Washing andReaming TIME: 23:59 hrs YESTERDAY 11397' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.12 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 7 6" MX-18HDX 5217177 3x14/0.4510 11400' In Hole 0' 0 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400' MW 8.9 VIS 59 PV 13 YP 16 Gels 5/7/8 FL 5.9 FC 1/2 SOL 1.5 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.5 ALK 0.70 Cl- 30,000 Ca+ 80 MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS 1463u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ CONNECTION GAS HIGH ETHANE (C-2) @ @ CONNECTION GAS: AVG PROPANE (C-3) @ @ CONNECTION GAS: CURRENT BUTANE (C-4) @ @ CURRENT AVG BACKGROUND PENTANE (C-5) @ @ HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Wash and ream to 10768’, lost returns @ 10768’, build 75BBL 100lb/BBL LCM pill, drop ball to open well commander and second ball to isolate BHA, pump 75 BBL LCM pill, back ream from 10730’ to 10700’ and pull out of hole to 9820’, service top drive and draw works, set on pill and monitor well with trip tank (5 BBL/hr average loss), establish circulation through well commander and drop ball to close well commander, circulate through bit to confirm circulation, drop ball to open well commander, trip in hole from 9820’ to 10373’, tagged bridge or ledge @ 10373’, circulate ream pump sweep and wash on top of trouble spot, wash and ream from 10373’ to 10650’ at report time. Max gas last 24 hours 1463 units @ 10630’. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 8/29/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson RiverField DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 29, 2013 DEPTH 11397' PRESENT OPERATION: Monitoring Well TIME: 23:59 hrs YESTERDAY 11397' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.12 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 7 6" MX-18HDX 5217177 3x14/0.4510 11400' In Hole 0' 0 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400' MW 8.9 VIS 59 PV 13 YP 16 Gels 5/7/8 FL 5.9 FC 1/2 SOL 1.5 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.5 ALK 0.70 Cl- 30,000 Ca+ 80 MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ 67u TRIP GAS 169u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ 1492.047 CONNECTION GAS HIGH ETHANE (C-2) @ @ 43.108 CONNECTION GAS: AVG PROPANE (C-3) @ @ 808.874 CONNECTION GAS: CURRENT BUTANE (C-4) @ @ 1169.696 CURRENT AVG BACKGROUND 67u PENTANE (C-5) @ @ 460.416 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Wash and ream from 10630’ to 10690’, lost circulation @ 10690’ condition mud and build 75 lb/BBL LCM pill drop ball to close well commander and isolate BHA, pump LCM pill, Pull up from 10703’ to inside shoe @ 9768’, condition mud and circulate to keep hole full, monitor well and open well commander, work pipe @ 9815’ and try to unplug well commander, service rig and top drive, fill and monitor well for 1 hour and refill annulus with 147 BBL, build LCM pill and pump down back side, pull out of hole from 9815’ to 9489’ dry, pump down drill pipe and establish circulation through well commander, fill hole and monitor well at rotary table, trip in hole from 9489’ to 10383’, condition mud and circulate, break circulation while filling backside, pump 70 BBL LCM slug, pull 19 stands and let LCM soak, cut and slip drill line, condition mud and circulate to clear LCM from string and close well commander, monitoring well at 9470’ at report time. Max gas last 24 hours 169 units @ 10690’. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 8/30/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson RiverField DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson DATE: Aug 30, 2013 DEPTH 11397' PRESENT OPERATION: Tripping In Hole TIME: 23:59 hrs YESTERDAY 11397' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.12 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 7 6" MX-18HDX 5217177 3x14/0.4510 11400' In Hole 0' 0 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400' MW 8.9 VIS 59 PV 14 YP 16 Gels 6/7/8 FL 6.8 FC 1/2 SOL 1.4 NAF/W 0.0/96.0 SD - MBT 1.0 pH 10.8 ALK 0.70 Cl- 30,500 Ca+ 48 MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ 45u TRIP GAS 169u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ 1490.9245 CONNECTION GAS HIGH ETHANE (C-2) @ @ 62.0416 CONNECTION GAS: AVG PROPANE (C-3) @ @ 581.3382 CONNECTION GAS: CURRENT BUTANE (C-4) @ @ 694.5375 CURRENT AVG BACKGROUND 45u/15u PENTANE (C-5) @ @ 230.7304 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Monitor well @9470’, rig up test pump to shear well commander closing sleeve and pressured up to 4850 psi, rig down test pump, pull out of hole from 9380’ to 96’, lay down directional tools (directional tools packed off with LCM and cuttings, change bit service rig make up pick up and test MWD and directional tools, trip in hole to 6960’, service rig and continue to trip in hole to 8823’ at report time. Max gas last 24 hours 75 units @ 9470’. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 8/31/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUME ... Hilcorp Alaska, LLC Swanson RiverField DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson, Yessak DATE: Aug 31, 2013 DEPTH 11397' PRESENT OPERATION: Pulling Out of Hole TIME: 23:59 hrs YESTERDAY 11397' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.12 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 7 6" MX-18HDX 5217177 3x14/0.4510 11400' 11400' 0' 0 3RR2 6" Hughes STX-1 5224897 3x20/0.9204 11400' In Hole 0' 0 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400' MW 8.4 VIS 27 PV - YP - Gels -/-/- FL - FC - SOL - NAF/W - SD - MBT - pH 7.2 ALK - Cl- - Ca+ - MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ 45u TRIP GAS 521u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ 1490.9245 CONNECTION GAS HIGH ETHANE (C-2) @ @ 62.0416 CONNECTION GAS: AVG PROPANE (C-3) @ @ 581.3382 CONNECTION GAS: CURRENT BUTANE (C-4) @ @ 694.5375 CURRENT AVG BACKGROUND 45u/0u PENTANE (C-5) @ @ 230.7304 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Trip in hole from 8823’ to 9449’, change pop off valve on pump #2, run in hole from 9449’ to 10268’, service rig, run in hole to 10328’ and started taking weight, wash and ream from 10328’ to 10610’, pump sweeps and circulate until hole is clean, pump 45 BBL pill and displace out of pipe, pull out of hole from 10610’ to 9792’, check flow, pull out of hole from 9792’ to 2578’ at report time. Max gas last 24 hours 521 units @ 10006’. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 9/1/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ... Hilcorp Alaska, LLC Swanson RiverField DAILY WELLSITE REPORT SCU 12B-09 REPORT FOR: Grubb, Greco, Pederson, Yessak DATE: Sep 1, 2013 DEPTH 11397' PRESENT OPERATION: Tripping in Hole TIME: 23:59 hrs YESTERDAY 11397' 24 HOUR FOOTAGE 0' CASING INFORMATION 7" @ 9849' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH 10914' 78.12 325.76 10433.18' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS/ TFA IN OUT FOOTAGE HOURS T/B/C PULLED 3RR2 6" Hughes STX-1 5224897 3x20/0.9204 11400' In Hole 0' 0 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ FT-LBS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING FLUIDS REPORT DEPTH MD/ TVD 11400' MW 8.4 VIS 32 PV 3 YP 5 Gels -/-/- FL - FC - SOL - NAF/W - SD - MBT - pH 6.9 ALK - Cl- - Ca+ - MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY (units) HIGH LOW AVERAGE DITCH GAS @ @ 28u TRIP GAS 53u CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY (ppm) SURVEY METHANE (C-1) @ @ 799.9066 CONNECTION GAS HIGH ETHANE (C-2) @ @ 79.1157 CONNECTION GAS: AVG PROPANE (C-3) @ @ 131.5928 CONNECTION GAS: CURRENT BUTANE (C-4) @ @ 136.8698 CURRENT AVG BACKGROUND 28u/0u PENTANE (C-5) @ @ 145.7793 HYDROCARBON SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY Loose sand, conglometrate sand, tuffaceous sandstone, tuffaceous siltstone, tuffaceous claystone, tuff, carbonaceous shale PRESENT LITHOLOGY NO RETURNS...Conglomerate sand, tuff, and conglomerate before loss of returns @ 11029' MD. DAILY ACTIVITY SUMMARY Pull out of hole from 2578’ to surface and lay down BHA, check upper pipe rams remove wear bushing and test lower pipe rams, install wear bushing, rig up casing equipment, pick up shoe track make up packers and trip in hole with casing to 967’, make up liner hanger with wiper rubber attached, rig down casing tools trip in hole 1000’ to 9122’ at report time. Max gas last 24 hours 53 units @ 9122’. CANRIG PERSONNEL ON BOARD: Strawn, Hillegeist __DAILY COST: $2660.00 REPORT BY: Mike Strawn Page 1 of 1Daily Report 9/2/2013 file://C:\DOCUMENTS AND SETTINGS\EPOCHADMIN\MY DOCUMEN ...