Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
188-080
-:er-2 i:-:srvais - ==Ds: Well hear can Location Clearance: Conc£us~ons: k Code STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil I'-I Gas D Suspended D Abandoned [] Service 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 88-80 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 50-029-21842 4. Location of well at sur/ace .~ ~ ~ 9. Unit or Lease Name 1820' FNL, 3863' FEL, Sec. 22, T11N, R14E, UM~ Prudhoe Bay Unit At Top Producing IntervalL_ ..--.J~Y~ ~ 10. Well Number 1609' FNL, 1320' FEL, SEC. 22, T11N, R14E, UM i[~ 15-25 At Total Depth{ ,~-..~--,.~ 11. Field and Pool 1440' FNL, 1151' FEL, Sec. 22, T11N, R14E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 62 feetI ADL 28306 Prudhoe Bay Oil Pool 12. Date Spudded !13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if offshore 16. No. o! Completions July 18, 1988 July 30, 1988 September 11, 1999 (P&A'd)I N/A feet MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 119. Directional Survey ~20. Depth where SSSV set 21. Thickness et Permafrost 9760' MD / 8935' TVD 9457' MD / 8721' TVD YES [] No F'!I 2193' feet MD 1900' (approx) 22. Type Electric or Other Logs Run DIL/BHCS/GR/SP/CNL/Cal, CET/CBT/GR, GCT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 20" 91.5# H-40 Surface 112' 30" 12150# Poleset 10-3/4" 45.5# J-55/L-80 Surface 3521' 13-1/2" !1000 sx cS III & 600 sx Class G 7-5/8" 29.7# L-80 Surface 8935' 9-7/8" !630 Sx Class G 5-1/2" 17.0# L-80 8597' 9758' 6-3/4" 200 Sx Class G 24. Per/orations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE rDEPTH SET (MD) PACKER SET (MD) 3-1/2" 8718' 8598' * Plugged & Abandoned all open perforation intervals. 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ORIGINAL 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) N/A Plugged & Abandoned Date of Test Hours Tested Production for OIL-BBL 'GAS-MCF WATER-BBL CHOKE SIZE JGAS-OIL RATIO I N/A Test Period > , Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (COLT) Press. 24-Hour Rate > 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence o! oil, gas or water. Submit core chips. * This l~,Ct.~V~l~ted per the 10-403 form approved September 10, 1999 (Approval #399-173) OCT 111 ,a~i~ Oil & Gas t):l.s. Form 10-407 Rev. 7-1-80 Al~hOr~]B CONTINUED ON REVERSE SIDE Submit In duplicate 29. NAME Top of Sag River Sand Top of Shublik Top of Sadlerochit Top of Zone lA GEOLOGIC MARKERS MEAS. DEPTH 8827' 887T TRUE VERT. DEPTH 8223' 8265' 8335' 8961' 9578' 8807' 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. N/A 31. LIST OF ATTACHMENTS Summary of 15-25 Pre Coil Tubing Sidetrack Plug & Abandonment OperaUons. 32. I hereby certify that the following is true and correct to the best of my knowledge. Signed '~ , (~}~YV~,_ Title AAI Coil Tubinq Drillin.q Supervisor Bruce E. Smith, P.E. Date INSTRUCTIONS Prepared by Paul Rauf 263-4990. General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28; If no cores taken, indicate "none". Form 10-407 15-25 DESCRIPTION OF WORK COMPLETED PRE COILED TUBING SIDETRACK PLUG & ABANDOMENT / TUBING SWAP SUMMARY Date Event Summary 9/09/1999: 9/11/1999: 9/14/1999: 9/18/1999: 9/19/1999: 9/2~1999: 9/21/1999: 9/22/1999: 9/23/1999: 9/24/1999: RIH & tagged PBTD @ 9596' ELM. A CTU Cement Plug was pumped to Plug & Abandon the lower wellbore prior to ST operations as follows: MIRU CTU & PT'd BOPE. RIH w/CT & killed well. Pumped 3 bbls of 17.0 ppg Neat Class G Cement, followed by 5 bbls of 17.0 ppg Class G Cement w/ Aggregate, followed by 12 bbls Neat Class G Cement to abandon the open perforation intervals located @: 9583' - 9628' MD (Zone lA) Reference Log: BHCS 7/30/1988. Placed 7 bbls of Cement behind pipe at a max sqz press of 1500 psi. Contaminated cement w/Biozan & jetted contaminated Cement f/the wellbore to the 9450' MD while maintaining 500 psi whp. POOH w/CT. FP well. RD. RIH & tagged TOC @ 9457' MD. PT'd Cement plug to 2000 psi - passed. RIH & punched 4' of holes in tubing @ 8556' MD for circulation above packer. All shots @ 4 SPF. MIRU 3S. Rig accepted 0600 hrs. Continued MIRU of 3S Rig. Circulated 1% KCL Water to kill well down tbg. NU BOPE. PT'd BOPE. Performed rig maintenance. PT'd BOPE. Prep for pulling tbg & cntl lines. Pulled 3-1/2" tubing. Continued to lay down old 3-1/2" completion string, control lines, & clamps. Moved pipe out of tool shed. RIH w/new 3-1/2", 9.3#, L-80 EUE tubing to 3200' MD. Continued RIH w/new 3-1/2", 9.3#, L-80 EUE tubing. Landed tubing in packer. PT'd tubing / IA to 2500 & 3000 psi - passed. ND stack. Continued w/15-25A Sidetracking Operations. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of request: AbandonS' Suspend_ Operational shutdown _ Re-enter suspended well _ Alter casing_ Repair well_ Plugging _X Time extension _ Stimulate _ Change approved program _ Pull tubing _ Variance _ Perforate _ Other _ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) ARCO Alaska, Inc. Development_X RKB 62 feet 3. Address Exploratory_ 7. Unit or Property name P. O. Box 100360 Stratigraphic__ Anchorage, AK 99510-0360 service_ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1820' FNL, 3863' FEL, Sec. 22, T11N, R14E, UM 15-25 At top of productive interval 9. Permit number / approval number 1609' FNL, 1320' FEL, SEC. 22, T11 N, R14E, UM 88-80 At effective depth 10. APl number 1462' FNL, 1268' FEL, SEC. 22, T11 N, R14E, UM 50-029-21842 At total depth 11. Field / Pool 1440' FNL, 1151' FEL, Sec. 22, T11N, R14E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 9760 feet Plugs (measured) PBTD tagged @ 9598' MD (5/23/1999) true vertical 8935 feet Effective depth: measured 9598 feet Junk (measured) true vertical 8821 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 110' 20" 215o# Poleset 112' 112' Surface 3488' 10-3/4" 1coo Sx CS m & 6oo sx C~ass G 3521' 3521' Production 8873' 7-5/8" 630 Sx C~ass G 8935' 8313' Liner 1161' 5~1/2" 2oo Sx C~ass G 9758' 8933' Perforation depth: measured 9583'-9628'. ;i ,...?':.'. -,, i,~::.;~. ~,,- iiii:~ ~ ~ true vertical 8811' - 8842'. L ' Tubing (size, grade, and measured depth 3-1/2", 9.2#, L-80 POT @ 8718' MD. ;,~ .... '~,, ~i~ ~,~ G0i,~.' .... ~"'~ ~,'~.~' ..... "':i~'~'i"~"~ Packers & SSSV (type & measured depth) 7-5/8" X 3-1/2" TIW SSBB PERMANENT PACKER @ 8598' MD. 3-1/2" CAMCO TRDP~IA-SSA SSSV @ 2218' MD. 13. Attachments Description summary of proposal __X Detailed operations program __ BOP sketch __X 14. Estimated date for commencing operation 15. Status of well classificaUon as: September 7, 1999 16. If proposal was verbally approved Oil .__X Gas __ Suspended _ Name of approver Date approved Service 17. I hereby certity.th, at the ~oregoing is true and correct to the best o! my knowledge. Questions? Call Andy KIr~ @ 300-1287. Title: AAI Coil Tubing Drilling Supervisor Date //'- Signed Br Prepared b)/ Paul Rauf 263-4990 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness I Approval no .... I Plug integrity_ BOP Test Location clearance _ -"/ Mechanical Integrity Test__ Subsequent form required 10- L(O ~1~ S S.ED. ¥ Robert N. Chdstenson Approved by order of the Commission Commissioner Date Form 10-403 Rev 06/15/88 · peuJn~o~j ,~doo peAo,~dd~, SUBMIT IN TRIPLICATE 15-25 P&A P & A Work 1) Mill out X-N nipple @8683'. 2) Set Baker 3-1/2" x 5-1/2" through tubing whipstock at 9580' w/E-line. 3) P & A perforations below whipstock. Clean off cement to 9570'. 4) Pressure test P & A for state witness. 5) MIRU 3S w/pipe shed. 6) Pull corroded 3-1/2" production tubing. 7) Run "class B" 3-1/2" production tubing completion. 8) Rig down pipe shed, rig up DS//4. 10-3/4" Shoe @ 3521' DS 15-25A Proposed CT Sidetrack 3-1/2", 9.2#, L-80 Tbg to 8718' TOL @ -8628' 7-5/8" x 3-1/2" Packer @ 8597' Tubing Tail @ 8718' 7-5/8" Shoe @ 8935' Top of Liner ,/,,2,/ Cement @ 9200' Whipstock @ 9580,-'/''~ 3" Open Hole TD @ 12~1 ~ 2-3/8" FL4S Liner Cemented & Perforated 5-1/2" Shoe @ 9760' TRSSSV Tubing-PC " casing Casing PATCH Gas Lift MandrelNalve 1 Chemical Mandrel/Dummy Valve 2 Chemical MandrelNalve 3 SEALASY PKR Liner NOGO · - POPLUG .................. Perf ......... Perf Perf FISH -" 15-25 15'25 APh 1500292184200 H2S:I Annular F1~8.5 ~-~ Reference Log:[ BHCS Last Tag:l Rev Reason:l Set Patch Elevations Well Type:! PROD Spud: J 7/18/88 ~ 812/88 L. st w/o: Last Update: J4/16/98 RKB: 62 ft KOP: 0.00 ftKB PBTD: TD: Max Hole Angle: Angle @ TS:134 deg @ 8961 Angle @ TD:J46 deg @ 9760 KB 62 ft J Cas Flng 0 ft Grd 30 ft J Tub Head 0 ft KB-Grd 32 ft General 'Notes -- All TRSSSV PATCH SEALASY PKR Description 3-1/2' Camco TRDP-1A-SSA SSSV Nipple 13.1/2' PTA Eclipse Tubing Patch (Set 01/12/96) 13-1/2' TIW Seal Assembly 17-5/8" x 3-1/2' TIW SSBB Permanent Packer [3-1/2' Otis XN Nipple 13-1/2' TIW Pump Out Plug 13-1/2' Tubing Tail NOGO POPLUG TTL Date Note LDL 10/29/95 Indicates Leak @ GLM#1 BALL SEALER TREATMENT 01/12/89, 08/14/91 I Foam SQZ'D (08/29/95) (11/14/95) I FRAC ZN1 08/15/91 13021 Min ID = 1.810' (3-1/2' PTA Eclipse Tubing Patch (Set 01/12/96)) ITTL ELM @ 8688: ELM Tubing Tail (Logged 10/i3/88) Daterun: 1988-08-02 :Fish ,:FISH - 9654 FISH Comment FISH: 32' 2-1/2' Hollow Carder Pert Guns Item 7.625 in Casing - PRODUCTION Top 0.00 Btm Wt J Grd 29.70J L-80 Btm Wt J Grd 17.00l L-80 Item 5.500 in Liner SURFACE Item 10.750 in Casing 10.750 in Casing Item TUBING 3.500 in Tubinq-PC Top Top 8597.00 Top Btm Wt T Grd 0.00 33.00 45.50~ J-55 33.00 3521.00 45.50| L-80 Bottom Len(ft) I Wt I Grd 8718.00 8718 9.20 L-80 Chemical Mandrels/Valves Man Type Gas Lift Mandrels/Valves Man Type ~ Perforations Summary Interval Zone 9583 - 9607 [ZONE lA 9607 - 9627 IZONE lA 9627 - 9628 JZONE lA Stimulations & Treatments Interval Date 9607 - 9628 7/22/91 Vlv Mfr I Vlv Type I Latchl Vlv I Vlv TROI Vlv nun Vlv Mfr J Vlv Type I Latch JPortVlv l Vlv TROl Vlv Run Statu~ Feet SPF Date I0 / 24j 418/2/91 l jo j 20j 8j8/15/91 j jo j il 4 j8/2/91, j Type APERF RPERF APERF Comment Type I Comment SQZ 6 2 CO]LED TUB'].NI3 'UNIT BOP EOM ! P~ENT 1. 5000 PSI 7" WELLHEAD CONNECTOR rLAI~G£ 2. 5000 PSI 4 1/16" PIPE RA~S 3. 5000 PSI 4 1/6" ~~UL~ SLIPS 4, 5~0 PSI 4 1/6" SHE~ ~S 5. ~ PSI 4 1/6" BLIND R~S 6. ~ PSI 4 1/16" STUFFI~ BOX . H]REL]NE BOP EOUIPHENT 1. 5000 PSI ?" WELLHEad:) CONN£C1OR fLANGE 2. ~>OO0 PSI W~RELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICAIOR 4. ~>000 PSI 4 1/6" FLOW TUBE PACK-Orr STATE OF ALASKA A'~.~,dKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown_ Stimulate_ Plugging_ Perforate_ Pull tubing _ Alter casing _ Repair well _ Other _X 2. Name of Operator: ARCO Alaska, Inc. !3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface: 820' FNL, 1415' FWL, Sec 22, T11N, R14E, UM. At top of productive interval: 609' FNL, 1320' FEL, Sec 22, T11N, R14E, UM. At effective depth: 504' FNL, 1342' FEL, Sec 22, T11N, R14E, UM. At total depth: 1498' FNL, 1276' FEL, Sec 22, T11N, R14E, UM. 5. Type of Well: Development _X Exploratory _ Stratagrapic _ Service _ 12. Present well condition summary Total Depth: Effective Depth: measured true vertical measured true vertical 9760 feet 9001 feet 9598 feet 8820 feet Casing Length Size Conductor 80' 20" Surface 3488' 10-3/4" Production 8901' 7-5/8" Liner 1161' 5-1/2" Plugs (measured) Junk (measured) 6. Datum of elavation (DF or KB feet): 62' RKB 7. Unit or Property: Prudhoe Bay Unit 8. Well number: 15-25 9. Permit number/approval number: 88-80 10. APl number: 50-029-21842 1. Field/Pool: Prudhoe Ba~' Oil Pool Cemented Measured depth True vertical depth 2150# Poleset 110' 110' 1000 Sx CS III & 3521' 3521' 600 Sx Class G 630 Sx Class G 8935' 8307' 200 Sx Class G 8597- 9858' 8023- 8999' Perforation Depth measured 9583 - 9628' true vertical 8810- 8891' Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80, PCT @ 8718' MD. Packers and SSSV (type and measured depth) TIW SS-BB Packer @ 8597' MD; Camco TRDP-1A-SSA SSSV @ 2217' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) see a~ached Intervals treated (measured) ""/bIN/IL 14. Representitive Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Prior to well operation 1204 26675 0 Subsequent to operation 1893 20511 0 Casing Pressure Tubing Pressure 970 851 15. Attachments Copies of Logs and Surveys run _ Dai,I)/Report of Well Operations _X 16. Status of well classification as: Oil _X Gas _ Suspended _ Service _ !17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~.,~ "~, ~ Title: Engineering Supervisor Form 10-404 Rev 06/15/88 Date 5-1. - ?? SUBMIT IN DUPLICAT 15-25 TUBING PATCH INSTALLATION DESCRIPTION OF WORK COMPLETED 10/5/98: RIH wNideo Camera to top of Tubing Patch at 3017' MD. PU backside to 3000 psi. No leak seen at top of Patch. RIH w/Camera & viewed a probable leak at bottom of Patch. RIH to view Chem Inj Mandrels; no Mandrel leaks found. POOH w/Camera. RD. 10/12/98: RIH & latched leaking Tubing Patch. POOH w/top 13' piece of Tubing Patch. Tubing Patch fish at 9564' MD. POOH. RD. RIH & tagged remaining 10/13/98- 10/14/98: RIH w/grapple & latched fish at 9564' MD. Couldn't drag by XN Nipple (2.75" ID) at 8683' MD. Fish dropped back to bottom. POOH w/small piece of fish. RIH w/swedge & bullnose and tapped down into fish. POOH w/Patch fish minus eight slips & rubber patch element. RD. 12/17/98: RIH & set 2-piece Eclipse Tubing Patch across GLM #1 at 3019 - 3044' MD (seal to seal). POOH. RD. Returned the well to production & obtained a valid welltest. ~.--.. STATE OF ALASKA ALASKA, .AND GAS CONSERVATION CC fiSSION REPORT OF SUNDRY WELL OPE. NATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well Perforate Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development X Exploratory Stratigraphic Service 4. Location of well at surface 1820' FNL, 1415' FWL, Sec 22, T11N, R14E, UM. At top of productive interval 1609' FNL, 1320' FEL, Sec 22, T11N, R14E, UM. At effective depth 1504' FNL, 1342' FEL, Sec 22, T11N, R14E, UM. At total depth 1498' FNL, 1276' FEL, Sec 22, T11 N, R14E, UM. ORIGINAL 6. Datum of elevation(DF or KB) 62' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-25 9. Permit number/approval number 88-80 10. APl number 50 - 029-21842 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 9760 feet 9001 feet Plugs(measured) Fill Tagged @ 9598' MD (11/12/95) Effective depth: measured 9598 feet true vertical 8820 feet Junk(measured) Casing Length Size Cemented Conductor 80' 20" 2150# Poleset Sudace 3488' 10-3/4" 1000 Sx CS III & 600 Sx CIG Production 8901' 7-5/8" 630 Sx CIG Liner 1161' 5-1/2" 200 Sx CIG Measured depth True vedicaldepth 110' 110' 3521' 3521' 8935' 8307' 8597-9858' 8023-8999' Perforation depth: measured 9583 - 9628' true vertical 8810 - 8891' Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80, PCT @ 8718' MD. I I'L;i-- I v I-- L) FEB 2 1 1~6 Packers and SSSV (type and measured depth) TIW SS-BB Packer @ 8597' MD; Camco TRDP-1A-SSA @ 2217' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure 965 12239 0 -- 2357 ~"'~J 19340 0 Tubing Pressure 2171 858 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify' that the foregoin~ i$ true and correct to the best of my knowledge. Signed '~~ ~'t' ~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 Date ,2.-/¢:-?~ SUBMIT IN DUPLICATE~ JWS cc' JWP. 15-25 DESCRIPTION OF WORK COMPLETED FOAMED SQUEEZES FOR GAS SHUTOFF & TUBING PATCH INSTALLATION 8/27/95: RIH & tagged PBTD at 9597' MD. 8/29/95: A Foamed Polymer Gel Squeeze was pumped fullbore for Gas Shutoff as follows: MIRU & PT equipment to 4000 psi. Pumped Foamed Gel & squeezed the treatment fluids through the perforation interval at: 9583 - 9628' MD (Z1A) Ref. Log: BHCS 7/30/88. Pumped: a) 100 bbls Crude @ 5 bpm, followed by b) 10 bbls Gelled Polymer Foaming Agent spacer @ 3.2 bpm, followed by c) 150 bbls Gelled Polymer Foaming Agent w/173 Mscf injected N2 @ 3.2 bpm, followed by d) 225 Mscf pure Nitrogen injected @ 4800 scf/minute, followed by e) 50 bbls Gelled Polymer Foaming Agent w/148 Mscf injected N2 @ 1.9 bpm, followed by f) 79 bbls Gelled Polymer @ 5 - 6 bpm, followed by g) 300 bbls Crude Overflush, followed by h) Shutdown. Rigged down. 10/29/95: Ran a leak detection log & saw a leak present at GLM located at 3042' MD. 11/12/95' FEB 21 RIH & tagged PBTD at 9598' MD. ~ Oil & Gas Cons. Commi~ I 1/14/95: A Foamed Polymer/Surfactant Resqueeze was pumped fullbore for Gas Shutoff as follows: MIRU & PT equipment to 4000 psi. Pumped foamed Polymer/Surfactant & squeezed the treatment fluids through the perforation interval (listed above). Pumped: a) 300 bbls Polymer/Surfactant @ 6.9 bpm, followed by b) 400 bbls Polymer/Surf w/1150 Mscf N2 injected at 3000 scfm @ 1 -2 bpm, followed by c) 29 bbls Polymer/Surfactant @ 1.1 bpm, followed by d) 100 bbls Crude, followed by f) Shutdown. Rigged down. 1/12/96: RIH & set a 3ol/2" PTA Eclipse Tubing Patch (1.81" ID) from 3021' to 3041' MD (seal to seal), in the 3-1/2" tubing, over the leaking GLM located at 3035' MD. PT IA at 3500 psi/15 rain; OK. RD. Returned the well to production & obtained a valid welltest. GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9915 Company: 12/1/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 ¢ Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 2-09'~-//' ~ [ PROD PRORLE 9 51 0 2 7 I 1 D.S. 2-10 '-~ .~' ,~ I PROD PROFILE 9 510 2 7 I 1 D.S. 4-03 '"'~ I O .~ PROD LOG WITH DE~ 951 031. I 1 D.S. 4-24~'. 30~ PRODPRORLE 951030 I I ' ......................... ,, , D,.S. 15-14 ~.(. {~ ~ LEAKD~CTION 951019 I 1 DS. 15-25 .~ ~ LEAK D~ECTION 9 51 0 2 9 I 1 ,,, .... , ......................... , , ., ...... , .,. , , ,, , ,., ,, ,,, ,, ,,. .... ,, , ,,, .,, , SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. 8/24/95 GeoQuest NO. 9660 D.S. 15-33 ~' 9 5 2 5 0 DUAL' BURST TDT-p 9 5 0 6 2 3 1 .... O.S. 5-36 q t 7 ~ PROD PROFILE 950731 1 1 D.S. 6-08 "-) ~ 7,,-'Z--- LEAK DETECTION 950729 I ....1 ..... O.S. 7-33 ~" ~ ~' DUAL BURST TDT-P 950729 ......,1 ...... 1 D.S. 11-27 ~'Kv('o I ~ CNTG 950730 1 1 D.S. 11-32 ~ L~ '~ ~'[ PERFRECORD ..... 950730 I 1 D.S, 12-01 ~7C~ ~ ~,_'_~ PROD LOG 950728 1 1 , D.S. 12-12~l' ~ ~_~ GAS LIFT SuRvEY 950727 1 . 1....... D.S. 12-28 ~ ({ ~3 ~. ~ PROD PROFILE ..... 950725 I ...... 1 .... D.S. 12-29 ~/ 0 ,'~ PROD PROFILE 950725 1 1 D,S, 13-3 '7 ~' ~) ~ ~ PROD PROFILE 950731 1 1 , , D,S, 15-1 ~-~ (~_[~ DUAL BURST TDT'P 950726 1 ., , 1 D,S 15-13 . ~3 t ~ ~. DUAL BURST TDT-P 950727 1 ...1.. D.S. 15-25" ~'~ C3 ~ DUAL BURSTTDT-P 950725 1 1 D.S. 17-20 ~Z--- I I- ~-'",,, PERFRECORD 950730 I I ..... ID.s. 18-02A /3' c"" ~,, '7/'~ PERF RECORD 950726 I 1 ...... D.S. 18-02A -~/ -) L)~"~' PROD FLUID SAMpLER 950722 I 1 ........ ,, .... ,p Alaska O# & fias Cons DATE: S I G N E D Please sign and return one copy of this transmittal to.Sherrie at the above address. Thank you. 500 W. International Airport Road ~ Company: Alaska Oil & Gas Cons Comm Anchorage, AK 99518-1199 ~, ~'~ Attn: Larry Grant ATTN: Sherrie ~j \.. ~.~ \ 3001 Porcupine Drive ( Anchorage, AK 99501 / Field: Prudhoe Bay Floppy Well Job #'- Log Description Date BL RF Sepia DIR MWD Disk GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 A'I-rN: Sherrie NO. 9628 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 8/9/95 Field: Well Job # Log Description Date BL Prudhoe Bay Floppy RF Sepia DIR MWD Disk o.s. =-~ ~1 [¥L~ .~.~.~co.o ~s0?=~ ~ ~ D.S. 6-7 ~ ~ O ~ I PROD PRORLE 95 0724 I 1 D.S. 12-30 ~ ~ I ~ ~ PRE~URE BUILD UP 9 5 0 7 21 1 1 D.S. 14-29 ~ ~ ~ ~ ~ PRODPRORLE 950721 I I .... ~ D.S. 15-14 ~l I~ ~ ~RFRE~RD 950721 I 1 D.S. 15-24 ~ ~ I ~ LEAK DETECTION 950721 I 1 D.S. 15-36 ~ ~ ~ PERFRE~RD 950724 I I .. D.S. 18-2A ~ ~ ~ ~ ~ PROD PRORLE .. 95 0 71 6 I 1 D.S. ~s-=s~;~o ~s=s~ DUnCBURS~D~-. ~~ ~ ,~S0~=S ~ D.S~ 11-3A ql.l~ 95260 CNTD (~ ~/950718 1 D.S. 15-1 ~.~ 95262 DUAL BURST TDT-P [~~- 950726 1 ~ ~V Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. ARCO Alaska~ Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 8-10-93 REFERENCE: ARCO CASED HOLE FINALS 1-6 7-31-93 1-12 7-27-93 1-29 7-27-93 /3- 0A ~3-20A 8-1-93 6-6 7-26-93 6-13 7-30-93 11-13A 7-28-93 12-26 7-29-93 13-7 7-30-93 14-22A 7-31-93 15-4 7-27-93 15-6 8-2-93 15-24 7-27-93 15-25 8-3-93 16-6 7-30-93 17-1 8-1-93 17-7 8-3-93 Production ~og l duction Peff Record~q~-q~ uc on ~ml Brat ~ ~'Rl~n Pe~ Record ,~- ~z%~ R~m Pe~ Record 9~w~o R~ Pe~ Record~6o -~7 ~ R,m Pe~ Record ~ 0~- ~t ~5 R~ Pe~ Record ~- Io~qo R,m Pe~ Record~t~5o-t%~O R,m ~ Brat ~ R,m ~ml Brat ~ R,m CNL ~t)-°L~9-'} R-n 1, 5" Sch D-n! Burst TDTP ~oo ~Rl~rt 1, 5" e%~ Sch Production Log~~~~ 1, 2"a5"z~o-Sch a~0 Production Log" Run 1, 2"&5"f~-~o-Sch~ ~ Production Log" Run 1, l"&5"zco-Sch ~o~) %~%-qD 17-9 8-2-93 Production Log" R-- 1, 2"&5"~lw-Sch Please s~ ~d' ret~ ~e at~ch~ cop~ ~ receipt of ~. RECEIVED BY_~~ ~ve i Nice ~y, ~~. ~. ~ C~~ON PB ~ F~ ~ CLOT C~~ ~ B~ ~ E~ON ~ ~A~ OF ~THON ~ MOB~ The correct API# for 11-13A is 50-029-21229-01 not 50-129-21229-01. The correct API# for 14-22A is 50-029-20747-01. The API# for 16-6 is 5O-029-20584. ARCO ALASKA, INC. F'.O· BOX iOOS6C, .... ANCHORAGE, ALA~'KA 9~ DATE~ 9-i 9-9i . ~ REFERENCE' ARCO CA3'ED HOLE FINAI_~' 8 x2-3 6-22-9t PERF RECORD RUN ~, 5' ~2-6 5-3~-9~ F'ERF' RECORD RUN i , 5' ~2-9 8-16-9~ PERF RECORD RUN ~, 5' .-: ~ 3t-9t F'ERF RECORD RUN t, 5' ~4-°'~,.. ~-a-~-mt~, , F'ERF RECORD RUN ~D-5 ~--24-9t PERF RECORD RUN % x5_i.2, 8-28-9t F'ERF RECORD RUN t, 5' 7-28 7-~.~-,~ PERF RECORD RUN .,. 9-~8 8-~8-9~ PERF RECORD RUN ~, 5' it-4 r ~9-9i F'ERF RECORD RUN ~ti--6 7-22--9t F'ERF RECORD RUN t, '-t2-i4 8-6-9t PERF RECORD RUN i, 5' .t2-28 5--29-9i F'ERF RECORD RUN t, .~S-28 8-t9-9t F'ERF RECURD RUN t, 5' $ 't4-9B ~ 8-2t-9t PERF RECORD RUN t , 5' x~5-25 8-t-9t PERF RECORD RUN t, 5' F'LEASE SIGN AMI) RETLff~N THE ATTACHED COF'Y AS RE:CEIF'T OF DATA, RECEIVED BY ~'-~~ HAVE A NICE DAY! ;;ONYA WALL. ACE ATO- t.;"~'~9: AF:'F'F,O~ E P HLS' I-{L,~ H£_5' HL$ I-ILS HL.Z HI_.? HLZ HLS' HL~? HL~ HL~ HL~' HL.~ klL~' HLS' H[_~' HLS' HL~' HL~ HL.~? HL~ D I ~ TR I BUT I [.IN CENTRAL. FI LE~7 r':_ H E V R 0 N D & M EXTFN.?ION EXF'LORATION EXVON M A R A 1' H 0 N · .-'"' MOBIL F'FII L_L I F'.'? F'B WELL FI;LES' R & D BF:'X STA'FE OF AL. A3'I<A TEXACO * TFIF CORRECT AF'I~: FOR i-tB ~ THE CORF.'EC'r AF'I~ FOR 2-3 I3~ 50-029-20077. ,-"THE C[)RRE"CT AF'I' FOR 3-27 % THE C(]RRECT LOG INT. FOR 5-'i2 13' 8836'-9249'. $ THE CORRECT API~I: FOR t4-9B IS' 50--,qoc~-°0~;'34.._, ,_ .,. -0'2. RECEIVED OCT 0 j 1991 ARCO ALASKA, INC· F' 0 BOX tO(~'z6¢, ANCHORAGE, ALASKA ~'DATE' 9--6-9t REFERENCE' ARCO CASED HOLE FINALS i -9- 8-t 7-9i ~.~-5- 8-8-9t .--'3-3s-. 4-29-- 8-i ,~-9i 7A-- 8--?-9t 7-t~'- 8-4-9{ 7-26~" 8--i 8--? t 7-28- 8.-t -9i --. o~ 8--3-9i 9-6- 8-Z-9i 9-? 8-t 9--9i 9-i 7--- 8-4-9i i i -'"-- 8-9-9i i i -?' 8-4-9t t t-":'4-.,.:. 8-4-9t t 2-3..,, 8-i 4-9i i 2-8B" 8-9-9t , i 3-3- 8-i i-9i i 3-i i-- 8-i i.-9i i 3-i 2- 8-i 5-~9i t 3-i 4- 8-t 6-9i i 4-23'-- 8-i i-9i t 5-2':'.':;--- 8-'t 4-9i i6-i- 8-i 6-9i i 8-3-- 8-t 6-9i PROD F'ROF I LE' TEMPERATURE PROD PROFILE GR-COLLAR F'II'S JEWELRY F'ROD PROFILE TEMPERATURE F'ROD PROFILE TEMPERATURE PERF BREAKDOWN/HPFM/TEMP LEAK DETECT PITS INJ PROFILE INJ PROFILE LEAK DETECT F' I TS/I.-IF'F M LEAF; DETECT PROD PROF'ILE PROD PROFILE PROD PROF'ILE F'ROD F'ROFILE PROD F'ROF"ILE PROD PROFILE F'ERF BREAKDOWN TREATMENT INJ PROFILE LEAK DETECT RUN i, 5' RUN t, 5' RUN i , 5 · RUN { , 5' RUN t, 5 · RUN i , 5' RUN i , 5' RUN i, 5' RUN t , 5 RUN t , 5' RUN t , .5' RUN RUN t , 5' RUN { , ~' RUN i , S' RUN i, 5 · RUN i , 5' RUN t , 5' RUN t , 5' RUN i , 5' RUN i , 5' RUN t , 2"&5' RUN i,J:;" RUN i , 5' RUN i , 5 RUN { , 5' RUN i ,_,.~' CAMCO CAMCO CAMCO CAMCO [,'AMC[) CAMCO [;ANCO CAMCO [;AMC[) CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA. RECEIVED BY ~~[~4~' ~.. HAVE A NICE DAY! SONYA WALLACE; ATO-i 5'-~9 AF:'F'RO~EI) TRANS-.- 9 DISTP. IBUTION CENTRAL. FILES CHEVRON D&M EXTENSION EXFLO~.ATION EXXON MARATHON MOBIL · ~-"~ PHILLIPS F'B WELL_ FILES R & D · '-. B F'X STATE OF ALASKA TEXACO ~- ~'°Os' Co "~ore,.ge '~¢;~i$$io4' * THE CORRECTEI) AF'I$ FOR i3-3 IS 50-029-20325, ...... STATE OF ALASKA ALASKA _AND GAS CONSERVATION CC '~ISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate X , Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1820' FN.L, 1415' FWL, Sec. 22, T 11 N, R 14 E, UM At top of productive interval 1609' FNL, 1320' FEL, Sec. 22, T 11 N, R 14 E, UM At effective depth 1504' FNL, 1342' FEL, Sec. 22, T 11 N., R 14 E, UM At total depth 1498' FNL, 1276' FEL, Sec. 22, T 11 N., R 14 E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 62 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 15 - 25 9. Permit number/approval number 88 - 80 10. APl number 50 - 029 - 21842 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 9760 feet Plugs(measured) 9001 feet Effective depth: measured 9717 feet true vertical 8965 feet Junk(measured) Casing Length Size Cemented Conductor 80' 20" 2150# Poleset Surface 3488' 10- 3/4" 1000 sx CS III & 600 sx CI "G" Production 8901' 7- 5/8" 730 sx Cl "G" Liner 1161' 5- 1/2" 200 sx CI "G" Measured depth 110' 3521' 8935' 8597-9858' True verticaldepth 110' 3521' 8307' 8023-8999' Perforation depth: measured 9583 - 9607'; 9607 - 9627'; 9627 - 9628' true vertical 8810 - 8827'; 8827 - 8841'; 8841 - 8842' Tubing (size, grade, and measured depth) 3- 1/2", 9.2#, L-80, PCT @ 8718' MD RECE V£D S r.. P 1 !99t Alaska 0il & Gas Cons. c0mmiSStot~' Anchorage Packers and SSSV (type and measured depth) TIW Packer SS-BB @ 8597' MD; 3- 1/2", Camco $SSV TRDP - 1 ASSA @ 2217' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached. Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 1949 15485 0 .... Subsequent to operation 677 2133 0 .... Tubing Pressure 1303 212 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed , Form 10-404 Rev 06/15/88 751 MRM c: SW, JWP Title Sr. Area Operations Engineer Date SUBMIT IN DUPLICATE DS 15-25 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE & ZONE lA FRACTURE TREATMENT 7/22/91 .- A CTU Squeeze for Gas Shutoff was performed as follows: MIRU CT & Cementing Equipment. PT equipment to 4500 psi. RIH w/CT & fluid packed wellbore w/seawater. Pumped 29 bbls of PVA cement, squeezing the perforations at: 9607 - 9623' MD (Z1) 9626 - 9628' MD (Z1) Ref. Log: BHCS 7/30/88. Placed 4 bbls of cement behind pipe at 3500 psi maximum squeeze pressure. Contaminated cement & cleaned out contaminated cement from wellbore. Layed in 19 bbls of 15.6 ppg Mud to 9450' MD, covering the squeezed perforations. POOH. Rigged down. 7/28/91: RIH w/CT & jetted Mud out of the wellbore down to 9691' MD. 8/2/91 .' Added perforations: 9583 - 9607' MD (Z1A) Ref. Log: BHCS 7/30/88. Reperforated: 9627 - 9628' MD (Z1A) Ref. Log: BHCS 8/1 4/91: MIRU & made Temperature Icg run. Performed a Perforation Breakdown Treatment through perforations (listed above). R[CE.IVED SEP ] 2 ]99! 7/30/88. ~a$~.0/J & Gas Cons. Commission ~nch0rage POOH w/logging tool & PT equipment to 8800 psi. Pumped: a) 100 bbls Seawater @ 15 - 25 bpm, followed by b) 415 bbls Seawater w/250 ball sealers, @ 15 - 25 bpm, followed by c) Shutdown. ISIP @ 2230. Surged balls 3 times, then resumed pumping d) 163 bbls 20# Gelled Seawater, @ 25 bpm, followed by e) Shutdown. ISIP @ 1450. PT & ran Temperature Log. Data indicated squeezed perfs were holding. POOH. RD. 8/1 5/91: MIRU & reperforated: 9607 - 9627' MD (Z1A) Ref. Log: BHCS 7/30/88. PT equipment to 8500 psi, then pumped a Propped Fracture Treatment through perforations (listed above). Pumped: a) 175 bbls 40# Linear Pre Pad, @ 25 bpm, followed by b) Shutdown. ISIP @ 1500 - 1800. Resumed pumping c) 300 bbls 40# Crosslinked Gelled Pad, @ 25 bpm, followed by d) 182 bbls 10# Cross Linked Slurry, w/prop concentrations @ 1-6 ppg, followed by e) 94 bbls 10# Linear Flush. Shutdown. Placed a total of 12,500 lbs of proppant into formation. Rigged down. 8/1 9/91: Cleaned out proppant to 9650' MD. Returned well to production & obtained a valid welltest. Note: Oil rate decreased by 1272 BOPD, but the decrease in the gas rate provided an incremental rate benefit of 1669 BOPD resulting in a net oil benefit of 397 BOPD. Oil rates are still slowly rising. ARCO ALASKA, INC. ,' · F',~O. BOX i00360 ANCHORAGE, ALASKA 99~i DATE· 8-50-9t REFERENCE' ARCO CASED HOLE FINALS 6- i =~' P. - i < · o i F' E F: F R E C 0 R D 7-..5 8-t5-9t PERF RECORD 7-i7 8--i2-9t CCL (TUBING CLJTTER) 7-i 7 8-i 7-9t VERTILOG 7-t 7 8--2i -9t PFC 9-2 8--t 6-9t VER'FILO6 9-4 8-- i 8-9 i COLI_AR/PERF 9-S 8-i 0-9i COLLAR/PERF -- 9-26 8--i 7-9t COLLAR/PERF i ~-i 0 8-i 4--9i COLLAR i 4-4 8-i i-cat, UUL/FERF' '"- i4-iO 8-2i-9i F'ERF RECORD i 5-25 8--i 5-9i COLLAR/PERF i 8--i 5 8-2i -9i F'i)K--i O0/6R/CCL i S-i 6 8-22-9i CNL PLEASE SIGN ANI) RETLtRN THE ATTACHED COPY F.:ECEIVED HAVE: A NICE ,:,AY, SONYA WALL. ACE ATO-i 529 F;:LIN. . i , _,.='" IN:UN RUN i , 5 IN:UN i, 5" Rlli"4. i , _, IN:UN i, 5" RUN i, 5 RUN RUN i , =.5 RUN RUN t , 5 ' RUN t , 5 RUN i , 5':" RUN i, '5" RUN t , _,~" RUN t, 5' A'S RECEIPT OF DATA. APPROVED "f'lN-.' A N S :~ 9 SCH SCH A'FLAS ATLAS ATLAS ATLAS A'f'L. AS ATLAS ATLAS SCI-.t ATLAS AI'LA~ SCH A FI_A~ ATLAS SCH DISTRIBUTION CENTRAL FILES CHE"'./RON D & M ' · '1 EXTENSION E. XF LuRMi'I Oi'~ · ..'"' I.':XXON, fiARATHON ~ MOBIL F' H I L. L_ T. F' .S' F'B WELl_ FILES R & D ~: B P X ~.'i'A',Ti![ OF. ALASKA T E X A C O ~_... STATE OF ALASKA ~-. ALASKA' _AND GAS CONSERVATION CC.. .41SSION REPORT UF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1820' FNL, 1415' FWL, Sec. 22, T11N, R14E, UM At top of productive interval 1609' FNL, 1320' FEL, Sec. 22, T11N, R14E, UM At effective depth 1504' FNL, 1342' FEL, Sec. 22, T11 N, R14E, UM At total depth 1498' FNL, 1276' FEL, Sec. 22, T11N, R14E, UM 5. Type of Well Development X Exploratory ..~ Stratigraphic ... Service 6. Datum of elevation(DF or KB) 62 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 15-25 9. Permit numbedapproval number 88-80 10. APl number 50 - 029-21842 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 9760 feet 9001 feet Plugs(measured) Effective depth: measured 9717 feet true vertical 8965 feet Junk(measured) feet Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 2150# Poleset 110' 110' Surface 3488' 10-3/4" 1000 sx CS III & 600 sx CI 'G' 3521' 3521' Production 8901' 7-5/8" 730 sx CI 'G' 8935' 8307' Liner 1161' 5-1/2" 200 sx CI 'G' 8597-9858' 8023-8999' Perforation depth: measured 9607-9623'; 9626-9628' true vertical 8873-8886'; 8889-8891' Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80, PCT @ 8718' MD Packers and SSSV (type and measured depth) TIW packer SS-BB @ 8597' MD: 3-1/2". Camco SSSV TRDP-1ASSA @ 2217' MD P F £ F'I'\IFf 13. Stimulation or cement squeeze summary i,~ ~ ~,, ~ ~ · ~. ,-" Intervals treated(measured) See attached FEB 2 5 ] 991. Treatment description including volumes used and final pressure /i~!~!S...~..0jJ .~ ~aS COP. S. (~Q. Qll~i$SI0~ 14. Representative Daily Average Production or Injecfi~h-'~-~{a~- OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 177 163 0 -- 200 3734 12761 0 -- 581 Subsequent to operation 16. Status of well classification as: Oil ~ Gas __ Suspended Service 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations Title Sr. Area Operations Engineer 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~iogrnme:0,j.M,04~8 ~~"~/~ 670 JWS c: Jo Gruber, ATO-1478 Date ~/,~.//~'/ SUBMIT IN DUPLICAT% DS 15-25 DESCRIPTION OF WORK COMPLETED MUD ACID STIMULATION TREATMENT 12/9/90: A Mud Acid Stimulation was performed as follows: MIRU CT & PT equipment to 4000 psi. RIH w/CT & displaced wellbore w/100 bbls of diesel, then treated perforations at: 9607 - 9623' MD (Z1) Ref. Log: BHCS 7/30/88. 9626 - 9628' MD (Z l) Pumped: a) 23.5 bbls 15% HCI w/10% Xylene, followed by b) 34 bbls Diesel Flush, followed by c) Shutdown, for 45 minute soak. Resumed pumping: d) 50 bbls 15% HCI, followed by e) 50 bbls 6% HCI - 1.5% HF, followed by f) 75 bbls 1% NH4CI Water, followed by g) 50 bbls 15% HCI, followed by h) 65 bbls 6% HCI - 1.5% HF, followed by i) 75 bbls 1% NH4CI Water, followed by j) 65 bbls 6% HCI - 1.5% HF, followed by k) 140 bbls 1% NH4CI Water. POOH & flushed CT w/40 bbls of Meth Water. Rigged down. Flowed well and obtained a valid production welltest. ARCO ALA,?KA., INC.. F', O, BOX t ANCHORAGE, ALA~:KA 995t DATE' '9-6-89 I*,EF'EI-,E.N..,E ARCO CA~ED HOLE FINAI._~' t-2 8-t 6-89 TEMP/F'LLJID DEN~'ITY RUN t, t'-t4 8-t 7-89 F'RODUC'f'ION F:'ROF'ILE RUN t .. 2-'2..'~ 8-':24-89 COLLAR/F'FRF' RUN t , 5-6 8-28-89 COLLAI;,'/PERF R'UN t , ;5-28 8-t 9--89 F'RODLICTION PROFIi..F RUN t , 6 2 8-14-89 PRO I ..... - ' DUC'FION I:'I;,'Ot:-'IL.E RIJN t it-te 8-t 8-89 INJECTION PROF'IL.E/-FEMP RUN t, tt-t8 8-2t -89 PRODUCTION F'ROFII_E RUN t, t 2-28 8-t 5-89 PRODUCTION PROFILE RUN t, t4-L~;2 8-tZ-89 LEAK DETECTION RUN t, t ... ~.....,' 8-20-89 F'ITS' RUN t , t7-it 8-t 8-89 F'RODUCTION F'ROFILE RUN t , F'I..EA~VE 2IGN AND RETURN THE ATTACHED COPY A2 RECEIPT OF DA'FA. # 5" 5' 5' 5" 5" 5' C A M C' 0 CAMCO A'f'I,..A~' A f' I.. A ;.~; C A M C 0 (] A M ] 0 CAMCO CAM(.]'() [.. ~-.~ ¢'~ _, LJ CAMCO C A M C 0 CAMCO RECEIVED BY DISTRIBUTION ~ CENTRAL F I LE~' ~ PHILLIF'~' ~ CHEVRON PB WELL F'ILEf D & M R & D ~- EXTEN~'ION EXPLORATION ~" BPX · "' EXXON ~ ~ ~ ,~TATE 01:" ALAA'KA MARATHON ~ ~ TEXACO ~ MOBIL %~ I '. " ~ · . THE CORRECTED API~ FOR ~-2 I~' 50 029-20053 STATE OF ALASKA -, REVISED ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~. GAS [~ SUSPENDED ~ ABANDONED ~ SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 88-80 3. Address 8. APl Number P.0. Box 100360, Anchorage, AK 99510-0360 50- 029-21842 4. Location of well at surface 1821' FNL, 1/+14' FWL, 5ec.22, T11N, R14E, UN At Top Producing Interval 1526' FNL, 1672' FEL, 5ec.22, T11N, R14E, UH At Total Depth 1441' FNL, 115/+' FEL, Sec.22, T11N, R1/+E, UN 9. Unit or Lease Name Prudhoe Bay Unit. 10. Well Number 15-25 11. Field and Pool Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 1 6. Lease Designation and Serial No. Prudhoe Bay 0i ] PoD] RKB 62' . ' I ADL 28306 ALK 2316 1;2. Date Spudded 113. DateT.D. Reached 14. Date Comp.,Susp. orAband. 115. Water Depth, if offshore 116. No. of Completions 07/18/88 J 07/30/88 10/13/88* I N/A feet MSL ] 1 17. Total Depth (MD+TVD) /18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth whereSSSV set I 21. Thickness of Permafrost 9760'MD, 8934'TV~ 9717'MD, 8904'TVD YES~;~I NO[-]. I 2217' feetMD I 1900' (approx.) 22. Type Electric or Other Logs Run D I L/BHCS/GR/SP/CNL/Ca], CET/CBT/CR, (;CT 23. CASING, LINER AND CEMENTIN( CASING SIZE WT. PER FT. GRADE SETTING DEPTH MD TOP RECORD CEMENTING RECORD BOTTOM HOLE SIZE 20" 91.5~ H-40 Surf 110' 30" 2150# Poleset 10-3/~" 45.5~ J-55/L-8C Surf 3521' 13-1/2' 1000 sx CS Ill & 600 sx L-80 L-80 7-5/8' 29.7~ Surf 8597 ' 8935 ' 9758' 1 7.0~ 9-7/8" 6-3/4" 630 sx C1 ass G 5-1/2' 24. Perforations open to Production (MD+TVD of Top and Bottom and AMOUNT PULLED interval, size and number) Perforated w//+ spf, 0° phasing 9607 ' -9623 ' MD/8832 ' -88/+5 'TVD 9626 ' -9628 'MD/88/+8 ' -8850 'TVD C1 ass G 200 sx Class G 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 0597 ' 3-1/2" 8718' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/^ 27. PRODUCTION TEST Date First Production (SHUT- IN ) Date of Tes_t__ I Hours Tested___ Flow Tubing .J Casing Pressure Press. - ~- IMethod of Operation (Flowing, gas lift, etc.) IPRODUCTION FOR IOIL-BBL__ TEST PERIOD I~ CALCULATED 24-HOUR RATE I~ --- 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None * NOTE: Drilled RR 8/2/88. Tubing run 9/24/88. Perforated well 10/13/88. Form 10-407 WC6/043 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. NAME Top Sadlerochit GOC Base Sadl erochi GEOLOGIC MARKERS MEAS. DEPTH 8961 ' TRUE VERT. DEPTH 8334 ' 8689 ' 8835' 30. 9414' 9618 ' FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. N/A 31. LIST OF ATTACHMENTS None 32, I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /' Title Regional Drilling EngrDate INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: .If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (D.F, KB, etc.). item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. item 28: If no cores taken, indicate "none" Form 10-407 ARCO ALAYKA, INC, P~O. BOX t (o)0S60 "--" ANCHORAGE, ALASKA 995i,.,. il) A T E ' 4 .... 2 6- 8 9 Rli:~I::'IEREiqCIE: ARCO F'RES'S'URE DA f'A 2 .... t0 4-..t .... 89 BI..IF ...... STATIC GRADIENI' ~. "') :-~ ,,-]. · .... 4.-")9 ,-. '- ,::. ~..-- 89 B HI": .... I::'L. OI,,J i Nt; (.;RAD.I: I~:N T -' t 6' S'" 2 '? '"' [39 B I"! F: ........ ,S' 1' A T I C G R A D I E N T 6-'S -,I .... t -89 BHF ...... ;.~; TAT I [,.7, [.;R~D I ENT' t - 1 6 4- t '?-8 ~ B I"IF: ....... S' 1'A'I'I C[;- R A D I E N T t .... t '? 4 - t 7-' 89 B !--I F: ........ ,"~ TA'F I Ct;; R A D I E N'F · l .... t8 4-"t7-87 BHF ....... ST~I'IC GRADIEN1' t-';24 :3--20-~9 BI'iF: ....... STATIC I;;RADIENT 2 t 8 4- t (')-' 89' ]E H F ......... ,.~ "f'A T Z C.., 6. R A D I E N'I" i ':2.-26 S'- S("')- 89 BHF ...... STAI" IC 6F;.'.~D I E~N'[ L~'"t 4-2-89 BHF ....... ,S"f Al'.'[ C [.;R~D I ENT 3-t ~ 4~"~-89 BHF ........ £"I"ATIC GRADIFNI" 4--~ t 4--i .... 8'? BHF ..... S'TAI"IC GRADIE:NI' 4.-t 2 ,I-3-89 BHP--SrATI[.; GRADIE:'N'F 4 - 2 t 4 --' 4 -' 89 B H F: ...... S' T A "r I C G R A D I E N 1' 5.-t0A 4-2-89 WHF ...... S'TA'I'IC GRADIENT ];-t9 4 .... ':2-89 BHF ...... S'TATIC GRADIENT _,"~ .-"~'~,.,_ 4-'~.-89,.. BHF ...... S'TA:f' '.[ C [:;RAD_I' EN T '5....25 4-.S--89 EH? ....STATIC GRADIE:N'{' 8-4 S.-'29-89 BHP--S'TAI' T C GRADIEN [' 8-8 3-29-89 B I"IF: ...... .s"rAT I C [;RADIEN'¥ 8-ii 3..-30-89 BHP--$TATIC GRADIENF ~ (..]--'i 7 3-.29-89 [ I-.11- ...... ,.-~TA'FIC GRADIENT 8-23 3-29-89 BI.-IF'--$TA [ I C GRADIENT F'I...EASE: SIGN AND REI'URN 'f'FIE AT'f'AC, HEI) COPY AS 0 T I ,S' CAHCO C A H C 0 C A f"! C 0 CAMCO C A H C 0 C A M C 0 C A Fi C 0 0 '1'' I S' 0'1' I S 0 'r I s o T I ,.k." O'F I ,S' CAMCO. C A M C 0 CAML;O C A M C 0 CAMCO 0 T I $ CAHCO 0 T I S C A H C 0 CAMCO RECEIF'I' OF DATA, RECEIVED BY HAVE A NICE DAY! SAI...I_Y FIOF:FECK EFt: ATO- t 529 ~~~']i~/~ A F:,F:,I'~ 0 V E D ~~__ Oil & 6~s 6OHS. 6ommissiorl ~ R A ~ ~~ 89 f77 Anchorage D I STR I BLJI' I ON CENTRAL FILES ~ ~ PHIl_LIPS [;HEEVRON F'B WEL. L F ILE;S' · .-~' D & M ~ R & D EXTENS'ION EXPLORATION -.-'"BPX ~ EEXXON '"' · ,,.ST~'i'F OF' ALAS'KA -,- 1'E.X~CO · ,-'"' HOBIL ARCO ALASKA, INC. P.O. BOX t00~60 ANCHORAGE, ALASKA DATE' REFERENCE' 4-4-89 ARCO CASED HOLE FINAL~ ~i-9 :3-t t -89 2-t 7 3;-22-89 5-t:3 3-t2-89 6-t 2 ~-25-89 6-t 4 3:-t 8-89 7-t 4 3;-t 2-89 9- t 6 3;-27-89 t t-24 3;-t 5-89 t t -24 3-~ 9-89 ~ 2-32 3-t 6-89 ~ 2-32 3-t 6-89 ~ 5-8 3-~ 3-89 ~ 5-25 3-t ~-89 ~ 8-~ 4 3-~ 7-89 ~ 8-~ 5 3-~ 7-89 ~8-~5 3-~ 8-89 ~8-2e 3-26-89 LEAK DETECTION TEMP & GAMMA TIE-IN LEAK DETECTION COLLAR/PERF COLLAR?PERF LEAK DETECTION TUBING CUTTER TEMP COLLAR/PERF CBT CET PIT/PRODUCTION PRODUCTION PROFILE .PERF RECORD PRODUCTION DUAL BURST TDT-F' COLLAR/PERF RUN t, 5" RUNS t&2 2'&5" RUN t, 2'&5" RUN t, 5' RUN t, 5' RUN t, 2"&5" RUN t, 5' RUN t, 5' RUN t, 5' RUN R!IN t, 5" RUN RUN t, 5" RUN RUN 1, 5' RUN RUN t, 5' PLEASE SIGN AND RETURN RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER AT0-t529 TRAN$ APPROVED _~___ THE ATTACHED COPY AS RECEIPT OF DISTRIBUTION DATA CENTRAL FILE~~ CHEVRON EXTEN£ION EXPLORATION EXXON MARATHON MOBIL PHILLIPS F'B WELL FILES R & D BF'X STATE OF ALASKA TEXACO CA~CO O'rlS CAMCO ATLAS A'i' LA~' CAMCO ATL. AS' CAMCO ATLAS SCH S'CH CAMCO ~'CH $CH ~'CH ATLAI' ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January 27, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 15-25 Approval No. 8-877 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/DRR/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi (DS 15-25)W1-3 WELLS3/105 ARCO A~aska, ~.c. is a Subsidiary of Afla.ticRichfie~dCompa.¥ AR3B--6132-C STATE OF ALASKA .... AL~-... 'A OIL AND GAS CONSERVATION COMMk.. ~ON REPOFrr OF SUNDRY WELL OPERATIONS 1. Operations,performed: Operation shutdown __ Stimulate V" Plugging __ Pedorate __ Pull tubing ..__ Alter casing __ Repair well __ Pull tubing __ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1820' FNL, 1415' FWL, Sec. 22, TllN, At top of productive interval 1609' FNL, 1320' FEL, Sec. 22, TllN, At effective depth 1504' FNL, 1342' FEL, Sec. 22, TllN, At total depth .. 149.8' FNL, 1276' FEL~ Sec. 22~ TllN, 12. Present well condition summary Total depth: measured 9 7 60 true vertical 9001 Effective depth: measured true vertical 9717 8965 Size Casing Length 5. Type of Well: Development ..L--/ Exploratory __ Stratigraphic __ Service ~ R14E, UM R14E, UM R14E, UM R14E, UM 6Datumelevation(DForKB) 62' RKB 7. UnitorPropertyname Prud~oe Bay Unit 8. Well number 15-25 9, Permitnumber/approvalnumber 8-877 10. APInumber 50-- 029-21842 11. Field/Pool Prudhoe Bay Oil Pool feet feet feet Plugs (measured) feet feet Junk (measured) Cemented Measured depth · True vertical depth Conductor 80' Surface 3488' Production 8901' Liner 1161' 20" 2150# Poleset 10-3/4" 1000 sx CS III & 600 sx Cl G 7-5/8" 730 sx Cl G 5-1/2" 200 sc C1 G 110' 3521' 8935' 8597-9858' 110' 3521' 8307' 8023-8999' Perforation depth: measured 9607-9623'; 9626-9628' true vertical 8873-8886'; 8889-8891' Tubing (size, grade, and measured depth) 3½", 9.2#, L-80, PCT @ 8718' Packers and SSSV (type and measured depth) TTW packer SS-BB @ 8597' MD; Camco 13. Stimulation or cement squeeze summary Intervals treated (measured) SSSV TRDP-1ASSA @ 2217' MD Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or ~ Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 0 0 0 2480 1512 55 Tubing Pressure 0 493 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil __ Gas __ Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~. ~,~///.~.~~/~ Title Operations Form 10-404 Rev 06/15/88 WELLS3/105 D. R. Reimers, 265-6205 Engineering Manager Date /~o°'~' SUBMIT IN DUPLICATE 15-25 PERFORATION BREAKDOWN TREATMENT OUTLINE OF CONDUCTED WORK Arco Alaska Inc. pumped an acid breakdown treatment on DS 15-25. A summary of the treatment is outlined below. December 22,1988 1.) Rigged up slickline unit. Pulled orifice valve and filled 3 1/2" x 7 5/8" annulus with diesel. Ran dummy valve. Pressure test annulus to 2500 psi. January 12, 1989 2.) Rigged up pump trucks and transports. 3.) Loaded and titrated acid. 4.) Pumped mud acid perforation breakdown treatment as follows: a.) b.) c.) d.) e.) f.) g.) 24 Bbls. diesel 12 Bbls. xylene 71 Bbls. 12% HC1 with additives and 70 ball sealers 140 Bbls. 12-3 mud acid with additives and 200 ball sealers 95 Bbls. NH4CL water 19 Bbls. slick diesel with 10% EGMBE 300 Bbls. slick diesel Well treated at an average rate of 6 BPM at an injection pressure of 4000 psi. 5.) Open well to flow to tank. Recovered approximately 600 Bbls before flowing well to low pressure system. 6.) Test well at rate of 2480 BOPD, 55 BWPD, and 610 GOR. STATE OF ALASKA ALASKA ~ ~ AND GAS CONSERVATION C~_ ,,ISSION WELL COMPLETION OR RECOMPLETIO# REPORT A#D LO(II 1. Status of Well OIL ~. GAS ,ri SUSPENDED ~ ABANDONED ~ SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 88-80 3. Address 8. APl Number P.O. Box 100360, Anchorage, AK 99510-0360 50- 029-21842 Classification of Service Well 4. Location of well at surface 1821' FNL, 1414' FWL, Sec.22, T11N, R14E, UN At Top Producing Interval 1526' FNL, 1672' FEL, Sec.22, TllN, R14E, UN At Total Depth 1441' FNL, 1154' FEL, Sec.22, TllN, R14E, UN 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. RKB 62' I ADL 28306 ALK 2316 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 07/18/88 07/30/88 10/13/88* 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 9760'MD, 8934'TVD 9637'MD, 8848'TVD YESXJ~ NO [] 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number 15-25 11. Field and Pool Prudhoe Bay Fi eld Prudhoe Bay 0il Pool 15. Water Depth, if offshore 116' No. of Completions N/A feet MSLI 1 20. Depth whereSSSV set I 21. Thickness of Permafrost 2217' feet MD I 1900' (approx.) 22. Type Electric or Other Logs Run D IL/BHCS/GR/SP/CNL/Cal , CET/CBT/GR, GCT 23. CASING, LINER AND CEMENTING RECORD CASING SIZE 20" 10-3/4" 7-5/8" 5-1/2" WT. PER FT. 91.5# 45.5# 29.7# 17.0# GRADE H-40 J-55/L-80 L-80 1-80 SETTING DEPTH MD TOP Surf Surf Surf 8597' BOTTOM 110' 3521 ' 8935 ' 9758' HOLE SIZE 30" 13-1/2" 9-7/8" 6-3/4" CEMENTING RECORD 2150# Pol eset 1000 sx CS III & 600 sx 630 sx Class G 200 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and interval, size and number) Perforated w/4 spf, 0° phasing 9607'-9623'MD/8832'-8845'TVD 9626'-9628'MD/8848'-8850'TVD AMOUNT PULLED lass G 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 8718' 8597' 3-1/2" 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED t N/A 27. Date First Production (SHUT- IN) Date of Test J Hours Tested Flow Tubing Casing Pressure Press. -- 'J --- pRODUCTION TEST IMethod of Operation (Flowing, gas lift, etc.) PRODUCTION FOR IOIL-BBL t TEST PERIOD I~ CALCULATED OIL-BBL 24-HOUR RATE I~' -.- GAS-MCF GAS-MCF WATER-BBL WATE R-B B L tc._o_.3 s,z. OIL GRAVITY-APl (corr) 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None * NOTE: Drilled RR 8/2/88. Tubing run 9/24/88. Perforated well 10/13/88. Submit in duplicate Form 10-407 Rev. 7-1-80 WC5/061 .1 CONTINUED ON REVERSE SIDE 29. NAME GEOLOGIC MARKERS MEAS. DEPTH TRUE VERT. DEPTH 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. Top Sadlerochit GOC Base Sadlerochi 8961 ' 9414 ' 9618 ' 8334' 8689' 8835' N/A 31. LIST OF ATTACHMENTS Addendum (dated 10/27/88) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Regional Drilling Title Engineer Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 WC5/061.2 ADDENDUM WELL: 9/16/88 15-25 Rn CET/CBT/GR f/9670'-8500'; bond good. Rn GCT f/9600'-surf. Dr~illing SupeyTV ~--~ J 1 TJJeco OJlJJeld S ;es inc. TELECO el 16 Nielson way A nchorage, AK 99518 (907) 562-2646 August 1, 1988 JOB #641 ARCO ALASKA WELL: DS-15 #25 LOCATION: PRUDHOE BAY RIG: NABORS 28-E Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to ARCO Alaska. Teleco is committed to providing the highest quality MWD service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, , Dave Reimer Field Service Supervisor DR/el Enclosures A ~I1~'1' COMPANY TELECO OILFIELD SERVICES JOB 641 SURVEY CALCULATIONS Date Page 07/27/88 Company: ARCO ALASKA Well: DS-15 #25 Location: PRUDHOE BAY Rig: NABORS 28-E TELECO Job # 641 TAK Grid Correction: Magnetic Declination: Total Correction: Proposed Direction: 0.00 degrees 30.80 degrees 30.80 degrees 85.30 degrees RADIUS OF CURVATURE CALCULATION MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' **************************************************************************************************** TIE IN WITH VERTICAL SURFACE CSG. 3530.00 0.0 114.1 S 65 54 E 3530.00 0.00 0.00N 0.00E 0.00 N 90.000E 0.000 TELECO MWD SURVEYS 4643.00 7.0 112.7 S 67 18 E 4642.07 29.23 13.48S 30.44E 33.29 S 66.104E 2.210 4876.00 10.4 98.7 S 81 18 E 4872.36 62.17 22.99S 64.27E 68.26 S 70.313E 1.709 5068.00 15.3 94.8 S 85 12 E 5059.49 104.00 28'.01S 106.66E 110.28 S 75.284E 2.590 4385.00 1.3 114.5 S 65 30 E 4384.85 12.80 6.01S 13.33E 14.63 S 65.727E 0.036 3819.00 1.1 114.1 S 65 54 E 3818.98 2.42 1.13S 2.53E 2.77 S 65.842E 0.381 TELECO Job # 641 TAK 07/27/88 Page 2 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 ' ********* ******************************************************************************************* 5257.00 21.4 87.8 N 87 48 E 5238.79 163.12 29.36S 166.08E 168.66 S 79.974E 3.426 5448.00 28.7 82.5 N 82 30 E 5411.71 243.90 22.53S 246.58E 247.61 S 84.779E 3.995 5676.00 35.7 83.9 N 83 54 E 5604.52 365.24 8.15S 367.14E 367.23 S 88.727E 3.087 6003.00 38.9 81.4 N 81 24 E 5864.61 563.14 17.18N 563.63E 563.89 N 88.253E 1.083 6320.00 35.2 80.7 N 80 42 E 6117.57 753.58 46.89N 752.27E 753.73 N 86.433E 1.175 6645.00 33.2 79.7 N 79 42 E 6386.35 935.52 77.98N 932.27E 935.52 N 85.218E 0.639 6955.00 30.0 78.3 N 78 18 E 6650.36 1096.95 108.97N 1091.69E 1097.12 N 84.299E 1.059 7340.00 34.7 80.0 N 80 00 E 6975.51 1301.71 147.74N 1293.96E 1302.36 N 83.486E 1.243 7666.00 35.5 79.0 N 79 00 E 7242.23 1488.20 181.90N 1478.27E 1489.42 N 82.985E 0.302 7967.00 32.6 79.7 N 79 42 E 7491.59 1655.81 213.04N 1643.88E 1657.63 N 82.616E 0.972 8251.00 32.7 80.7 N 80 42 E 7730.72 1808.42 239.12N 1794.87E 1810.73 N 82.411E 0.194 8431.00 31.6 84.2 N 84 12 E 7883.11 1904.07 251.71N 1889.80E 1906.49 N 82.413E 1.202 8589.00 31.9 84.6 N 84 36 E 8017.47 1987.21 259.82N 1972.55E 1989.59 N 82.496E 0.232 8887.00 33.4 81.1 N 81 06 E 8268.37 2147.80 279.83N 2132.04E 2150.33 N 82.523E 0.809 PROJECTED T. D. 8945.00 33.5 81.0 N 81 00 E 8316.77 2179.68 284.80N 2163.62E 2182.29 N 82.501E 0.205 ~800 2000 600 I-- 0 z ! 200 800 ~00 4OO TELECO 0 i 1 f i e 1 d Serv ices PLAN VIEW EAST (~t) 0 400 800 1200 1600 2000 2400 0 :9000 4000 50OO 6000 W o 7000 8000 I0000 I 1000 12000 TELECO 0 i 1 ¢ i e 1 d Serv ices VERT I C^L PROJECT I ON 1000 8000 ;9000 4000 5000 6000 VERTICAL SECTION (Ct) $ UB.$ URFA CE DIRECTIONAl. SURVEY r-~ UIDANCE r~ONTINUOUS [-~ eeL Company ARCO ALASKA, INC. Well Name- D.S. 15-25 (1821' FNL,1414' Field/Location PRUDHOE BAY, NORTH SLOPE, FWL,SEC 22,TllN,R14E,UM) i ALASKA Job Reference No. 73006 PORTER Date 17-SEP-88 Computed By: SINES * SCHLUNBERGER * , , GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC, DRILL SiTE 15-25 PRUDHOE BAY I',IOR'];H S[,,O[:'E, AI.~ASKA SUR%EY DATE: 17-SEP-85 ENGINEER: PORTER METHODS OF C¢]MPUTATION TODb LOCATION: TANGENTIAL- Averaged deviation and azimuth INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ, DIST, PROJECTED ONTO A TARGET AZIMUTH OF NORTH 85 DEG 16 MIN EAST ARC(9 ALASKA INC. DRILG $I?~ PRUDHOE BAY NOR?H SLOPE,ALASKA COMPUTATION DATE: 16"NOV'88 PAGE .1 ()ATE OF SURVEY~ 17-$EP-88 KELLY BUSHING ELEVATIONI 62,00 FT ENGINEER: PORTER INTERPOI, ATED VALUES FOR ~.:VEN 100 FEET UF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPT~ DEG MIN DEG MIN 0 O0 100 O0 200 O0 300 O0 400 O0 5OO O0 6O0 O0 700 O0 800 o0 900 O0 o.00 -u2,00 0 0 N 0 0 E 100'00 38,00 0 0 S 6 25 E 200 00 138,00. 0 0 S 8 50 E 300:0o 238.00 0 5 S 55 28 ~: 400,00 338,00 0 2 $ 51. ] E 500,00 438,00 0 4 S 67 8 E 600 oo 538 oo 0 8 s 7~ 9 ~ 700:00 6~8:00 0 8 s 80 3~ E 800~00 738,00 0 6 N 76 34 E 900,00 838,00 0 1 N 34 51 E 1000 O0 1000.00 1100 1200 1300 1400 1500 1600 1700 1800 1900 938,00 0 1 S 57 54 W O0 1100,00 1038,00 0 1 S 74 41 E O0 1200 O0 1138,00 0 12 S 84 46 E O0 1300:00 1238,00 0 18 S 88 10 E O0 1400,00 1338,00 0 18 N 87 0 E O0 1499 99 1437,99 0 13 N 72 40 E 00 1599:99 1537,99 0 17 N 66 10 E O0 1699.99 ~637.99 0 22 N 59 19 Fi O0 1799,99 1737.99 0 28 N 61 34 E 00 1899,99 1837,99 0 31 N 67 52 E 2000 O0 1999 98 1037.08 O0 2199!94 2100 2 2400 2500 2600 2700 2800 ---, 2900 O0 2099 97 2037.97 96 2137.96 O0 2299 2237.94 O0 2399 94 2337.94 00 2499~92 2437.92 00 2599.91 2537.~1 O0 2699.89 2637.H9 O0 2799.87 2737,87 00 2899.86 2837.86 0 40 N 65 49 E 0 55 N 65 R E 0 54 N 64 2 E 0 q8 N 62 25 E 0 51 N 66 2 E 0 53 ~ 67 31 E 0 57 N 75 22 E 1 11 N 81 41 E 0 58 $ 89 42 E 0 43 S 74 55 E 3000 O0 2999.86 2937,8~ 3100 3200 3300 3400 3500 3600 3700 3800 3900 O0 3099,85 3037.85 O0 3199,~4 3137,84 O0 3299.84 3237,84 O0 3399.83 3337,83 O0 3499 82 3437.82 00 3599:81 3537.81 00 ]699 80 3637.80 O0 3799:78 3737,78 O0 3899.76 3837,76 0 40 S 70 6 E 0 39 S 64 14 E O 36 S 6b 38 F 0 36 S 60 42 E 0 42 S 62 19 E 0 35 S 59 23 E 0 57 S 63 56 E 1 ! S 65 49 E 1 1 S 67 23 E 1 7 S 65 22 F VERTICAL DOGLEG RECTANGULAR COORDINATES HORXZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMiJTH rE'ET DEG/IO0 FEET FEET FEET DEG 0,00 0.00 0.00 N 0,00 E 0,00 N 0 0 E 0,00 0,00 0,01S 0.00 W 0,01 S 10 51 W 0.00 0,00 O,Ol S 0,00 E 0,01 S 0 0 E 0.06 0.04 0,07 S 0,06 E 0,09 S 41 3 E 0.12 0,00 0.17 S 0,14 E 0,22 S 39 10 E 0,22 0.11 0,23 S 0,24 E 0,33 ~ 46 10 E ') 0.40 ~,O0 0,30 S 0.43 E 0,52 S 54 42 E 0,64 ,18 0,34 ~ 0.67 E 0,75 S 62 56 E 0,87 0,17 0,33 $ 0,90 E 0,96 $ 69 44 E 1.00 0,13 0,30 S 1.03 E 1,07 S 73 57 E 1.05 0,13 0,29 S 1,09 0,19 0,27 $ 1,32 0,05 0,26 S 1,76 0,12 0,26 S 2.31 0,17 0,24 S 2.76 0.19 0,13 S 3.18 0,16 0,00 N 3,73 0,24 0,29 N 4.44 0,15 0,67 N 5.24 0,12 1,05 N 1,08 E 1,11 E 1,34 E 1 79 E 2 34 E 2 78 E 3 19 E 3 72 g 4,40 E 5,17 E 1,12 S 75 7 E 1,14 $ 76 31 E 1,37 S 79 7 E , 80 S 81 51 E ,35 S 84 10 E ,78 S 87 16 E ,19 N 89 55 E 3,73 N 85 31E 4,45 N 81 16 E 5,28 N 78 29 E 6.24 0,24 1.47 N 7.59 0,12 2.08 N 9.11 0,21 2 78 N lO.4b 0,00 3:45 S 11.81 0,00 4,07 N 13.25 0,16 4,68 N 14.82 0.18 5,17 N 16.65 0.32 5,52 N 18.63 0.25 5.71 N 20.07 0,16 5,55 N 6.14 7,44 8,91 10,21 11.52 12,91 14.45 16 24 18~22 19.68 6.31 N 76 29 E 7.73 N 74 22 E 9 34 N 72 40 E 10:77 N 71 19 E 12.21 N 70 33 E 13,73 S 70 5 E 15,34 N 70 18 E 17,16 N 71 13 E 19,09 N 72 36 E 20,45 N 74 14 E 21,21 0,26 5,16 N 22.21 0,05 4.71 N 23.17 0,00 4,24 N 24.06 0.28 3,88 N 25.08 0,00 3,36 N 26.03 0.25 2.80 N 27.29 0.02 2.13 N 28.80 0,00 1,39 N 30,39 0,00 0,68 N 32.05 0,00 0,08 S 20 86 E 21~90 E 22,90 E 23,82 E 24,88 E 25,88 E 27,21 E 28.78 g 30.44 E 32,16 E 21,48 N 76 5 E 22.40 N 77 52 E 23.29 N 79 30 E 24 13 N 80 45 E 25:11 N 82 18 E 26,04 N 83 49 E 27 29 N 85 31E 28:81 h 87 13 E 30.44 N 88 42 E 32,16 S 89 51 E ARCO ALASKA I_NC, DRILL SITE {5-25 PRUDHOE BAY NORT[~ SbOPE,ALASKA COMPUTATION DATE: 16-NOV-88 DATE OF SURVEYI 17~$EP-88 KELLY BU$ttING ELEVATIONI 62,00 FT ENGINEERS PORTER INTERPObATED VALUE6 FO~ EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH' PEG MIN DEG MI~ 4000 O0 3999 75 3937 75 4100 O0 4099 4200 O0 4199 4300 4400 4500 4600 4700 4800 4900 , ! 7 S 65 27 E 72 4037,72 I t0 S 65 50 E 70 4137,70, I 17 S 67 8 g 68 4237,68 ! 21 $ 67 31E 64 4337 64 I 28 S 67 38 E 58 4437:58 2 56 S 71 56 E 27 4537,27 5 57 S 69 16 E 53 4636,53 7 49 S 76 13 E 28 4735,28 9 47 S 83 56 E 66 4833,66 11 3 S 83 14 E 00 4299 O0 4399 00 4499 O0 4599 O0 4698 00 4797 00 4895 VERTICAL DOGLEG RECTANGULAR COORDINATES HORXZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 33.7b 0.07 0,90 S 33,95 E 35,51 0,16 1"73 S 35,77 E 37 37 0,23 2,57 S 37,71 E 37 39~44 0,00 3,47 S 39,86 E 40 41,61 0 O0 4.41S 42 ~2 E 42 44,68 2162 5.59 S 451,9 E 45 51.75 2,61 8,22 $ 52,61 E 53 62.93 2.]3 12,01 S 64,14 E 65 78,16 0,94 14,42 S 79,62 E 80 95,69 2,25 16,58 S 97,39 E 98 33 96 $ 88 28 E 35 81 $ 87 14 E 80 $ 86 5 E 01 $ 85 1E 25 $ 81 7 E 5 $ 79 23 E 2 $ 79 44 E 79 S 80 20 E 5000 O0 4993,37 q931.37 13 26 5100 O0 5089,85 5027'85 1.7 2 5200 O0 5184.58 5122,58 20 2 5300 O0 5277 68 5215,68 22 58 5400 O0 5368 46 5306,46 26 36 5500 O0 5456 28 5394,28 30 5 5600 O0 5542 45 5480,45 31 5 5700 O0 5625 83 5503,83 3)5 33 5800 O0 5706.01 5644,0! 37 25 5900 O0 5785,05 5723.05 38 6 6000 O0 5863,44 5801 44 38 39 6100 O0 5941,79 587~:79 37 54 6~00 00 6021.56 5959,56 36 18 6300 O0 6102,56 6040.56 35 32 6400 O0 6184 37 6~2~,37 34 42 6500 O0 6266:80 6204,8o 34 15 6600 O0 6349:7'7 62d7.77 33 33 6700 O0 64]3 56 6371.56 32 33 6800,00 6518.0~ 6456.01 32 15 6900,00 6603,23 6541.23 30 43 7000 O0 6689,67 6627.67 29 ql 7100 7200 7300 7400 7500 7600 7700 7800 7900 O0 6776.13 6714,13 30 54 O0 6861.61 6799,61 31 22 O0 6946 02 6884.02 33 44 O0 7028:55 69bb.55 34 42 O0 7109 86 7047,86 3b 27 00 7190' 7271,47 7128,47 ]5 57 O0 7354,90 7209.90 34 54 O0 .37 7292,37 3~ 3 O0 7437.50 7375,50 33 27 585 6 E S 85 37 g N 89 44 E N 86 39 E N 83 29 g N 81 37 E N 82 0 E N 83 28 E N 82 22 E N 82 20 E 116.60 2,34 142,45 4,17 174,17 2,72 210,60 3,29 252.48 4,51 300.19 1.73 350,84 3 71 405,93 3123 465,63 0,87 526,80 0,38 ~4 82 2 E N 81 28 E ~} 81 24 g N 81 17 E h 80 31 E N 79 56 g N 79 20 E N 78 q4 E 588.81 0 89 650.83 1:84 710,99 1 03 769,49 0:84 826.84 0,78 883.24 0.56 938,78 0,97 993,04 1,16 0,76 1,38 ~: 77 53 E 1046.20 N 77 43 E 1098,08 N 77 41 F 1147.92 N 79 19 E 1197,77 N 80 38 E 1249,46 N 79 40 E 1302,84 N 78 45 g 1359,00 N 79 26 E 1416,85 N 79 41 E 1475.75 N 78 53 E 1533.48 N 78 39 E 1589,66 N 78 55 E 1644.89 0,79 2,47 0,40 2 9O I 26 0 8O 0 ~6 ~ 16 18 69 S 118 55 E 120 OX S 8! 2 E 20 75 S 144 65 E 146 13 $ 81 50 E 22 O0 S 176 59 E 177 96 S 82 53 g 20 80 S 213 04 E 214 05 $ 84 25 E 17 10 S 254 76 E 255 33 $ 86 9 E 10,84 S 302 11 E 302 31 $ 87 56 E 3,40 S 352 33 E 352,34 $ 89 26 g 3,31N 407 05 E 407,06 N 89 32 E 10,66 N 466:34 E 466,47 N 88 41E 18.88 N 527;04 E 527,37 N 87 56 E 27 23 N 588 57 E 36i~2 N 650 05 E 45 7 N 709 68 E 53 9 N 767 66 E 63 02 N 824 45 E 72:66 N 880 25 E 589,20 N 87 ~1 E 651,06 N 8648 E 711,12 N 86 21E 769,55 N 85 58 E 826,85 N 85 37 E 883,24 N 85 16 E 938, 993, 82,70 N 935,15 E 80 N 84 56 E 93,06 N 988,74 E 1! N 84 37 E 103,92 N 1041,18 E 1046,35 N 84 18 E 114,98 N 1092,32 E 1098,36 N 83 59 E 125 69 N 1141 44 E 1148,34 N 83 42 E 135:88 N 1190 62 E 1198.35 N 83 29 E 144:67 N 1241 76 Ei250,16 N 83 21E 153,80 N 1294 57 E 1303,67 N 8~ 13 E 164,39 N 1350 04 E 1360,01 N 83 3 E 175,50 N 1407.17 E 1418,07 N 82 53 E 186,09 N 1465,39 E 1477,16 N 82 45 E 196,84 N 1522,42 E 1535,10 N 82 37 E 207,92 N 1577,89 E 1591,53 N 82 29 E 218,76 N 1632.41 E 1647,00 N 82 22 E ARCO ALASKA INC, DRIt, L ~ITE [5 25 PRUDHDE BAY NORTH SbOPE,ALASKA COMPUTATION DATE: 16-NOV-88 PAGE .3 DATE OF SURVEY1 17-SEP-88 KELLY BUSHING ELEVATIONI 62.00 FT ENGINEERI PORTER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH 'TRUE St!B-SEA COI. IR~SE MEASURED VERTICAl. VERTICAL DEVIATION AZIMUTH DEPTfl DEPTH DEPTH DEG ~MIN DEG MIi~ VERTICATo DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DXST, AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MXN 8000 O0 7521.5! 7459.51 32 14 8100 O0 7606.57 7544,57 31 26 8200 O0 7691 32 7629.32. 32 35 8300 8400 8500 8600 870O 8800 8900 00 7775 77 7713'77 31 52 00 7860 91 7798,91 31 32 O0 7946 11 7884,11 31 30 O0 8031 28 7969.28 32 11 O0 8115 74 8053,74 32 37 O0 8199 78 8137,78 32 56 O0 8283,48 8221,48 ]3 28 9000 O0 8366 59 8304,59 34 30 9100 9200 930~ 940 9500 9600 9700 9760 O0 8447 59 8385,59 37 15 O0 8526 16 8464.16 38 50 O0 8603 37 8541,]7 40 23 O0 8678 30 8616.30 42 21 O0 8751 44 8689,44 43 44 O0 8822 51 8760,5~ 45 35 00 8892 48 88~0.48 45 35 O0 8934~47 8872.47 45 35 N 79 34 E 1698.83 N 80 47 ~ 1751.20 N 81 54 ~ 1804.15 N 83 I E 2177.05 N 81 46 E 2232.60 N 80 55 E 2291 09 N 80 41 E 2352~76 N 80 34 E 2416.09 N 80 39 E 2482.09 N 80 20 E 2550,03 N 80 24 E 2620.12 N 80 24 E 2691.31 N 80 24 E 2734.02 1,29 1.26 0,88 1.12 0.68 1 05 2:50 0,87 2 21 0:58 2,75 2.63 0 67 2:25 1,30 1.83 1,88 0,00 0.00 228,80 N 1685 70 E 1701 237,87 N 1737 49 E 175 3 245,75 N 1789 97 E 1806 253,38 N 1U43 O0 E 1860 260,65 N 1894 93 E 1912 266,99 N 1940 90 E 1965 272'64 N 1998,99 E 2017 278,46 N 2052,21E 2071 291,05 N 2160,40 ~ 21 79 N 82 16 E N 82 12 E 76 N 82 10 E 34 N 82 10 E 77 N 82 10 F \ 12 N 82 11E ~ 50 N 82 14 E 02 N 82 16 E 21 N 82 18 E 9i N 82 19 E 298,35 N 2215 54 E 2235,54 N 82 19 E 307,27 N 2273 49 E 2294,16 N 82 18 E 317 07 N 2~34 56 E 2355.99 N 82 15 E 327'55 N 2397 24 E 2419 ~2 N 82 ~3 E 338:24 N 2462 58 E 2485.0 N 82.0 E 349,55 N 2529,81 E 2553 84 N 82 7 E 361 29 N 2599,17 E 2624 [6 N 82 5 E 373:~9 N 2669,62 E 2695 58 N 82 2 E 380134 N 2711,89 E 2738 43 N 82 0 E ARCO ALASKA PRUDHOE BAY NORTH SLOPE,ALASKA COMPUTATION DATE: 16-NOV-88 PAGE .4 INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMOTtt DEPTH DEPTH DEPTH DEG NIH DEG HIN 0 O0 1000 4000 5000 8000 9000 0 On oo xoOo O0 1999 O0 2999 O0 3999 00 4993 O0 5863 O0 6689 O0 7521 O0 8366 -b2,00 0 0 O0 938,00 0 1 98 1937,98. 0 40 86 2937 86 0 40 37 4931,37 13 26 44 5801,44 38 39 67 6627,67 29 41 51 7459.51 32 14 59 8304,59 34 30 9760.00 8934,47 8872,47 45 35 VERTICAL DOGLEG RECTANGULAR COORDINATES HORXZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH FEET DEC/lO0 FEET FEET FEET PEG SIN N 0 0 E 0,00 S 57 54 W 1.05 N 65 49 E 6.24 S 70 6 E 21.21 S 65 27 E 33.76 S 85 6 E 116.60 N 82 2 E 588,81 N 77 41 E 1147,92 N 79 34 E 1698.83 N 81 46 E 2232.60 N 80 24 E 2734.02 0,00 0,13 0.24 0,26 0 07 2:34 0,89 0,79 1,29 2.75 0,00 N 0.29 S 1 08 E 1 1,47 N 6 14 E 6 5,16 N 2'0 86 E 21 0 90 S 33 95 E 33 18 69 S 118 55 E 120 27 23 N 588 57 E 589 125 69 N 1141 44 E 1148 228 80 N 1685 70 E 1701 298.J5 N 2215:54 E 2235 0.00 E 0 O0 N 0 0 E 12 S 75 7 f 3{, N 76 29 E 48 N 76 5 E i S 88 28 r N 87 21E ~4 N 83 42 E {6 N 82 16 E 4 N 82 19 E 0,00 380,34 N 2711,89 E 2738,43 N 82 0 E ARCO ALASKA I_NC DRILL SITE {5-25 PPUDHOE BAY NORTH SLOPE,ALASKA COMPUTATION DATE: 16-NOV-BB PAGE 5 DATE OF SURVEYI 17-$EP-88 KELLY BUSHING ELEVATIONI 62.00 FT ENGINEERI PORTER INTERPOLATED VALuEs FOR f:VEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE NEASURED VERTICAL VERTICAL DEVZATION AZIMUTH DEPTH DEPTH DEPT~ DEG MIN DEG ~IN 0 O0 62 O0 162 O0 26~ O0 36 O0 462 O0 5'62 O0 662 O0 762 O0 862 O0 0 O0 62:00 162.00 262 O0 362 O0 462 O0 562 O0 662 O0 762 O0 862 O0 -62.00 0 0 N 0 0 E 0,00 0 0 S 13 29 W 100,00. 0 0 S 9 0 E 200,00 0 3 S 48 40 E 300,00 0 3 S 25 5 g 400,00 0 4 S 51 21 ~ 500,00 0 7 S 68 28 E 600.00 0 8 S 87 3 E 700,00 0 8 N 87 58 g BO0,O0 0 4 N 79 0 E 962 O0 1062 1162 1262 1362 1462 1562 1662 1762 1862 962,00 900.00 O0 1062,00 1000,00 O0 1162.00 1100,00 O0 1262 O0 1200,00 O0 1362 O0 1300,00 O0 1462 O0 1400,00 O1 1562 O0 1500,00 Ol 1662 O0 1600,00 O1 1762.00 1700.00 O1 1862.00 1800.00 0 2 574 3 E 0 2 N 85 17 E 0 10 N 84 i5 E 0 16 N 86 41 E 0 20 N 86 31 E 0 15 N 69 42 E 0 15 N 73 8 E 0 22 N 62 17 E 0 29 N 61 57 E 0 30 N 65 15 E 1962 2062 2162 2262 2362 2462 2562 2662 2762 --, 2862 02 196~ O0 lqOO.O0 03 206~ :00 2000.00 04 2162 O0 2100.00 05 2262:00 2200.00 06 2362,00 2300,00 07 2462.00 2400.00 08 2562.00 2500.00 10 2662.00 2600.o0 12 2762.00 2700.00 13 2862.00 2800.00 0 37 N 65 26 E 0 52 N 64 47 E 0 55 N 64 18 E 0 48 ~ 61 23 E 0 50 N 65 31 E 0 52 N 66 20 E 0 55 N 73 34 E 1 3 N 79 57 E 1 7 N 85 5 E 0 48 S 81 ~5 E 2962 14 2962.00 2900,00 3062 15 3062.00 3000.00 3162 262 362 ]462 3562 366~ 376 3862 16 3162.00 3100.00 16 3262.00 3200.00 17 3362.00 3300.00 ~7 3462.00 3400.00 18 3562.00 3500,00 20 3662,00 3600,00 21 3762,00 ]700.00 23 3862,00 3800.00 0 42 S 70 53 E 0 38 S 65 39 E 0 37 S 65 17 g 0 32 S 69 48 E 0 41 S 63 36 E 0 37 S 60 30 E 0 57 S 64 7 E 1 0 $ 65 8 E 1 1 S 67 21 E 1 5 S 65 48 E VERTICAl. DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DXST, AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MXN 0.00 0.00 0.00 N 0.00 E 0'00 N 0 0 E 0.00 0.00 0.00 S 0.00 ~ 0.00 S 45 0 W 0,00 0,00 0,01S 0,00 W 0,01 $ 5 54 W 0.02 0.00 0,04 S 0,02 E 0,05 $ 29 9 E o'oo s 40 4 E 0.18 0.08 0.20 S 0.20 E 0,28 $ 44 13 E 0.32 0.19 0.28 S 0.34 E 0,44 $ 50 46 E 0.54 0,05 0,33 S 0 57 E 0,66 8 60 2 ~ 0.78 0 08 0,34 S 0:81E 0,88 $ 67 lq E 0.97 0:19 0.30 $ 1.00 E 1.05 $ 73 3 E 1.04 0.11 0,28 S 1.07 1.07 0.02 0,26 S 1,09 1.19 0,02 0.26 S 1,22 1.57 0.19 0.26 $ 1.59 2.09 0.14 0,25 S 2 12 2.60 0.27 0.18 S 2~62 3.00 0.00 0,06 S 3,02 3.51 0,13 0.17 N 3.51 4.14 0.13 0,52 N 4.11 4.02 0.25 0.92 N 4.86 1,10 $ 75 23 E 1,12 S 76 23 E 1,24 $ 78 1 6i S 80 44 E 2:1 s 83 16 F. 3 $ 8~ 0 E 2'062 54 E 3, S 8 N 87 9 E 5.84 0.01 1 30 N 7.02 0,23 1:83 N 8.54 0,09 2,51 N 9.97 0 O0 3.19 N li.28 0:10 3 83 ~ 12.70 0.00 4:45 N 14.21 0.08 5.00 N 15.90 0,29 5,41 N 17.94 0 60 5.68 N 19.58 0:38 5,66 N 5 75 E 6~90 E 8 36 E 9 73 E 11 O0 E 12 38 E 13 84 E 15 51E 17 53 E 19 18 E 20.79 0.06 5.32 N 21.84 0.00 4.89 N 22.82 0.00 4.41N 23.72 0.02 4.02 N 24.68 0,00 3.57 N 25.70 0,38 3,00 N 26.74 0,18 2.41 N 28.21 0.00 1.67 N 29.79 0.04 0.94 N 31,41 0,16 0.23 N 20 42 E 21 51 E 22 53 E 23 47 E 24 47 E 25 54 E 26,64 E 28,17 E 29.81E 31.50 E 3 51 4:15 N 82 44 E 4,94 N 79 16 E 5 89 N 77 15 E 7 14 N 75 9 E 8 73 N 73 16 E 10 25 N 71 49 E 11 65 N 70 47 E 13 15 N 70 14 E ) 14 72 N 70 7 E 16,42 N 70 46 E 18 42 N 72 3 E 20~00 N 73 34 E 21,10 N 75 24 E 22,06 N 77 11E 22,96 N 78 55 E 23 81 N 80 17 E 24 73 N 81 42 E 25 72 h 83 17 E 26 74 N 84 49 E 28 22 N 86 36 E 29 82 N 88 li E 31:50 N 89 35 E ARCO ALASKA INC. DRILL SITE {5-25 PRUDHO£ BAY NORTH SLOPE,ALASKA C[]fqPU'rATIOf~ DATE: 16-NOV-88 PAGE 6 DATE OF SURVEY{ 17-$EP-88 KELLY BUSH{NG ELEVATION{ 62.00 FT ENGINEER{ POR?ER INTERPOLATED VALUES FOR EVEN 100 FEET []F SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAl., VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN VERTICAl., DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH FEET PEG/lO0 FEET FEET FEET DEG MIN 396~ 25 3962 O0 3900,00 4062 416~ 4~6 436~ 446 456~ 4663 4764 4865 7 4062 9 4162 32 4262 34 4362 38 4462 56 4562 16 4662 21 4762 74 4862 1 7 S 65 5 g O0 4000.00 I 8 S 65 42 E O0 4100,00, 1 13 S 66 35 E 00 4200,00 1 20 S 67 22 E O0 4300,00 1 24 S 67 21 E O0 4400,00 1 58 $ 70 1 E O0 4500.00 4 52 S 69 53 E O0 4600.00 7 16 S 72 13 E O0 4700,00 9 26 S 82 50 E O0 4800,00 10 27 S 82 37 g 4967 5O7O 5~76 5283 5392 5506 5623 5744 5870 5998 81 94 5062 O0 5162 05 5262 76 5362 60 5462 08 5562 80 5662 74 5762 15 5862 4962 O0 4900.00 12 44 O0 5000,00 15 51 O0 5100.00 19 29 O0 5200,00 22 25 O0 5300.00 26 17 O0 5400.00 30 13 O0 5500,00 32 9 O0 5600,00 3b 45 O0 5700,00 37 55 O0 5800,00 38 39 $ 84 32 E S 85 26 E $ 88 58 E N 87 8 E N 83 39 E N 81 31 E N 82 33 E N 83 2 E N 82 16 E N 82 3 E 33.12 0.09 0.59 34.83 0.20 1.42 36.64 0.00 2.25 38.65 0.13 3,13 40.77 0.04 4,05 43.19 2,7g 5,07 48.55 3,17 6,98 58.4t 1,95 10,70 72,27 2.20 13,76 89,43 1,57 15,79 109.4b 2.22 134.27 4 38 166.07 3:44 204,1~ 3.38 249.2 4,51 303.48 1,32 363.09 4,98 432.36 2.36 508.81 0.76 587.66 0,89 33 28 E 35~07 E 36 95 E 39~04 E 41 24 E 43 76 E 49 30 E 59 50 E 73 66 E 91 05 E 33 28 S 88 58 E 35 37 39 44 49 6O 74 92 1E 10 $ 8734o 02 S 86 E 16 8 85 24 E 44 & 84 2 79 S 81 56 E 45 $ 79 48 E 9] S 79 25 E 41 8 80 9 E 18,03 S {.11 33 E 112 78 $ 80 47 E 20,12 S 136 40 E 137 87 $ 81 36 E 21,97 S 169 88 8 82 34 E 168 46 E 21,11S 206 61E 207 17.49 S 251 50 E 252 10'3b S 305 38 E 305 1,80 S 364:48 E 364 6.42 N 433!30 E 433 16.46 N 509 i9 E 509 27.07 N 587 43 E 588 68 S 84 9 E 11 $ 86 i E 55 $ 88 3 E 48 S 89 43 E 35 N 89 9 E 45 N 88 8 E 06 N 87 21E 61 6372 6494 6614 6733 6851 6968 7083 7200 54 5962.00 5900.00 37 27 03 6062.00 6000.00 35 54 77 6162.00 6100.00 34 52 ~0 6262.00 ~20n,00 34 17 67 6362.00 6300.00 33 24 71 6462.00 6400.00 32 23 83 6562.00 b500.O0 31 34 09 6662.00 6600.00 29 57 53 6762.0n 6700,00 3~) 37 46 6862.00 6800,00 31 22 7319 25 6962.00 0900.00 34 12 7440 87 7062 O0 7000.00 35 24 7564 7687 7809 7929 8047 8 8401 77 7162,00 7100,00 36 13 90 7262.00 7200.00 35 2 21 7362,00 7300.0u 3) 59 29 7462.00 7400.00 33 7 71 7562 O0 7500.00 31 37 ~6 7662~00 7600.00 32 15 74 7762.00 7700.00 32 4 98 7862.00 7800.00 31 32 N 81 28 E 666.41 N 81 20 E 740.39 N 80 48 E 811.36 N 79 57 E 879.99 N 79 15 E 946.85 N 78 27 E 1011.02 N 77 47 E 1073.38 N 77 41 E 1132.16 D; 78 47 E 1189.35 N 80 38 E 1249.70 N 79 28 E 1313.53 N 78 49 E 1382,32 N 79 47 E 1455,09 N 78 59 E 1526 57 N 78 40 E 1594~79 N 79 12 F ~660.86 h 79 59 E ~723.96 N 81 40 E 1785.56 N 81 42 E 1848.99 N 82 33 E 1910,64 2.18 0 65 0:95 0.54 0.99 0.88 1.98 1,00 2.97 0,40 1,75 2,66 0.72 1.34 0'77 1 32 1 54 1 56 I 28 0 68 38.53 N 665 50 E 666 62 N 86 41 49.59 N 738:82 E 740:48 N 86 9 60,49 N 809,13 E 811 39 N 85 43 E 72,09 N 877,03 E 879 99 N 85 18 E 84.20 N 943.11 E 946 87 N 84 53 E 96.65 N 1006,48 E 1011 11 N 84 30 E 109.70 N 1067,97 E 1073 59 N 84 8 E 122.30 N 1125,91 E 1132 53 N 83 48 E 134.32 N 1182,30 E 1189 91 N 83 31E 144,70 N 1241,99 E 1250 40 N 83 21E 155,74 N 1305.13 E 1314,39 N 83 11E 168 95 N 1373.06 E 1383,42 N 82 59 E 182:39 N 1444,97 E 1456,44 N 82 48 E 208.93 N 1582,95 E 1596,68 N 82 28 E 221.79 N 1648,18 E 1663.03 N 82 20 E 233,29 N 1710.54 E 1726,38 N 82 14 E 243 09 N 1771,54 E 1788.14 N 82 11E 252:13 N 1834,44 E 1851 69 N 82 10 E 260.74 N 1895,59 E 1923:44 N 82 lO E ARCO ALASKA TNC. DRILL SITE [5-25 PRUOHOE BAY NORTH SLOPE,ALASKA COr4PUTATION DATE: 16-NC.~V-88 PAGE 7 DATE OF SURVEYS 17-SEP-88 KELLY BUSHING ELEVATIONS 62.00 FT ENGINEER, PORTER INTERPOLATED VALUES FOR EVEN' 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZiNUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZINUTH DEPTH DEPTH DEPTH DEG NIN DEG ~IN FEET DEG/IO0 FEET FEET FEET DEG NIN 8518 63 7962.00 7900.00 31 25 8636 25 8062,00 8000.00 ]2 5 8754 99 8162.00 8100,00. 32 50 8874 26 8262.00 8200.00 33 20 8994 44 8362 O0 8300,00 34 22 9118 15 8462 O0 8400,00 37 41 9246 15 8562 O0 8500.00 39 17 9378'01 8662 O0 8600,00 42 9514'63 8762 O0 8700 O0 44 9760:00 8934 47 8872:47 45 35 ~ 8] 40 E lg72.02 N 83 52 ~ 2033.92 . 83 3~ E 2097.91 N 8~ 6 E 2~6:.88 N 81 51 E ~29 46 N 80 55 F~02:08 U 80 25 E 238! 72 N 80 46 E 2467:36 N 80 16 E 2560 12 N 80 24 E 2734:02 1,47 0.00 0.38 0.60 289 2,57 297 2,17 309 1,71 321 1,53 335 2,28 351 0,00 380 268.08 N 1956 57 E 1974 85 N 82 11 E 274,68 N 2018:14 E 2036 74 N 82 14 E 281 77 N 2081,76 E 2100 74 N 82 17 E 2146,33 E 2165 74 N 82 19 E 34 N 91 N 2212 43 E 2~32 01N 2284~37 E 2~05 84 N 2363,23 E 2385 86 N 2447,99 E 2470 25 N 2539 80 E 2563 34 N 2711:89 E 2738 39 N 82 19 E 18 N 82 17 E 04 N 82 14 E 92 N 82 11 g 97 N 82 7 E 43 N 82 0 E ARCO AbASKA T, NC DRILI~ SITE ~5-25 PRUDHOE BAY NORTH SLOPE,ALASK NARKER · SHUBLIK ZONE 4 TOP SADLEROCHIT ZONE 3 ZONE 2 GOC ZONE lB ZONF lA LAST READING GCT BASE SADLEROCHIT PBTD TD COMPUTATION DATE: 16-NOV-88 PAGE DATE OF SURVEYS 17-SEP-88 KELBY BUSHING ELEVATION{ 62,00 FT ENGINEER{ PORTER INTERPOI,ATED VALUES f'OR CHOSEN HORIZONS MEASURED DEPTH BELOW KB SURFACE 60CATION AT ORIGIN= 1821 FNL, 1414 FWL, SEC. 22 ~ISl~ R14E TYD RECTANGUI~AR co6R %ES ' FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 8877,00 8961,00 89~.00 91 ,00 9216 O0 9414 O0 9469 O0 9578 00 9600 00 9618 O0 8264.29 8334.]0 8334.]0 8476,87 8538.61 8688,63 8728.95 8807.05 8822,51 8835,11 8202 29 8272 30 8272 30 8414 87 8476 61 8626 63 8666 95 8745 05 8760 51 8773 ll 289 52 N 21¢7 295:32 N 2193 295 32 N 2393 310184 N 2295 318 ?0 N 2344 3]9 78 N 2471. 345,9? N 2508 358,70 S 2583 361,29 N 259t 363,44 N 261 82 E 87 E 17 E 86 £ 9637,00 9760.00 8848.40 8934,47 8786,40 8872.47 365,70 N 380,34 N 2625 24 E 2711~89 E COMPUTATION DATE: 16-NOV-88 PAGE ARCO ALASKA PRUDHOE BAY NORTH SLOPE,ALASKA DATE OF SURVEY{ 17-SEP-88 KELLY BUSHING ELEVATION{ 62,00 FT ENGINEERI PORTER ************ STRATIGRAPHIC SUMMARY MARKER MEASURED Df:PTH BELOW KB FROM KB SHUBLIK ZONE 4 TOP SADbEROCHIT ZONF 3 ZONE 2 GOC ZONE 18 ZONE .lA LAST READING GCT BASE SADLEROCHIT 8877 00 8961 O0 8961 00 9137 O0 9216 00 9414,00 9469,00 9578 00 9600:00 9618,00 8264,29 8334.30 8334.30 8476.87 8538.61 8688.63 8728.95 8807,05 8822.51 8835.11 8202,29 8272.30 8272 30 8414:87 8476.61 8626,63 8666,95 8745.05 8760.51 8773,11 289 52 N 295 32 N 295 32 N 310 84 N 318 70 N 339 78 N 345,97 N 358,70 N 361,29 N 363,44 N 87 E 81E 2508 77 E 2583 73 E 2599 17 E 2611 86 E PBTD TD 9637,00 9760,00 8848.40 89:)4.47 8786,40 ~872,47 365,70 N 380,34 N 2625 24 E 2711:89 E FINAL WELL LOCATION AT 'CD: TRUE SUB-SEA MEASURED VERTICAL Vf~RTICAb DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DIS'i'ANCE AZIMUTH 9760.00 8934.47 8872.47 2738.43 )",i 82 0 E SCHLUMBERGER O I RECT I ONAL SURVEY COMPANY ARCO ALASKA INC. WELL DRILL SITE 1S-2S FIELD PRUOHOE BAY COUNTRY USA RUN DATE LOOOEO 17 - SEP - 88 REFERENCE 73006 WELL'' D.S. 15-25 ('1821' FNL, 1414' FWL, __C 22, TllN, R14E,UM) ~"~'HORIZONTAL PROJECTION NORTH 2000 REF ?~OOS SCALE : 1/SO0 IN/FT ] SOO 1000 SOO -SO0 - ] 000 - ] SO0 -2000 -~,--4.--~--.~--4.-4..4-.4-.J...I .-J-.4.-~...~..¢.4...-~....~...~...~...-%.~..4-.4...~...~..4...~,..-~ ....... ~...~...~ ...~...~...~..4..4 ........... ~...;...~...~...~...~..4...~ ....... ~ ....... ~...L .L..~ ........... ~ .......................... ~ ....... 1 ............ ~ ...~-~._L..~_t._L.L..~...~...~ ~ ~ ~ I~ ~ : ~ ,.-L.~...~...i...L.~...~....L..~...L.~..~~ ~ ~ ~ ~ ~ : ~ ~ ~ : ~: .L ~ ~ L./.~ ~ ~ ~ ~ ~. L ~ ~ : ~ ~ :._L:_~.i.? ....... ~ . ~ :-- .L.. I..~ ~ .~-.-~ 1...~. ~ ....... . ~. . ~ ~ ........ ~ i ...... .~ -~"%T"T- -?T'"T"T"'~"'T-T"T'"T" '"T'"T"'T'T"~'"T'"r"T'-'T-'r"~'"+"!'":'"r"T-'~"'T'"!'~-y"~-'!-! ....... +-~"'f-'?'"~'"~'"'~'"~"'~'"~'"~ ............... ~ .............................. ~ ........ ~": ........ ""'"~ ................ ?'"':'"~ ....... '"~ "~'"+'"f'"t"?'f'"~'"'b" "'~'"~"'+'"~'"~'"+--'~ -'~-'?"~'"~'--~'"~'"~'-'~ ....... ~"'Y'"~ ...... f"'+"'+'"?;-~'"~-"~"-~ ....... ~ ...... ~-'-'"~-'~ ................ ~ ........................................................ ; .......... = ...... ' ...................................... -~.-.+..-+.?,.~...+..-+..?...~-... -+.-e..~-?.?..~...~.,.+.,.~...+...~...-..~...;...+...+.......~...~ ...... ~.-+.?..;-i...~...+-.~...; ....... ~,..~..+...;...+...~...?...,..;...+ .................. ~ ................. ~..~ ............... ; .................. ~ .................... ~ .................... ---~-~--~.,-J-~-~..-~---J.--J-.., -.J.-J-.-~...~..j-..~.-.~...-h...~..- ...~...~...~...;...Lj..4.,.J..$-....~...~...~...~ ...... ;...;...;...; ....... ~ ....... J...~..4..-~ ........... ~...~ ................... J ...... ;....~ ........................... ~ .......... ~......-~ ................. ; ................. ---~---~-..~.--~...c~.--~---G---.-44--:---~---~-.-~--.~--.~---~.-.---~-.-~---~..-~-.~.-+--~..+..~...~-.~...~...~...H4.-~-.~-.~ ...... ~------+-.G..~..-,..~..-~ ...... ~-.~..-~...~...~ ...... ?.~ ...... :-.-: ........... ~..?.~ ...... ~..~ ............... ~.-.~ .............. "-~-.~-f..f~T..f.~f..f..f......f.+..f..f.+..f..~-.+...f...."f.+..~..~..~-~."~...~...+...~..~-~-~...~.-~.-~-~...~...~ ~¢.~-~-.~.4-.-~--.~--+.R ...... ~-';--J"-~'-'f-'~-'~-"?;-' "'~"J'"+"~"'r'~'"~"-:-"~-"~ '-'~ .......... ~"'~ .......... ~ '''~ .... ~-~f..+-f"f.-~..?.f..f..Y-~..~f.~f..i...f.%.f.?f-~-.~..f..f.?f.-f..f..f-f.h~.q-.~-e-~...f-~-f..i..i..~ ---i"'f'-!-f'+'G'"f-'f-"~ ...... ~..+--r-+..?-+--+--f ........ f-+?'--'f"-'"r"f'--c"-~ .................. f ....... ~"'~"?'- ,_~...~...~_~... _.~...~._~...~......~...~...~...~.- ...~..~._~_.~......~...~...~...~...,...~...,...~...~., ~.~.~...~...~_ .-~.-+...~.. ~.... _ ~ ~. ~_ m ~._~.,.~ ~ ~ ~, - _~..~. _~_.,...~_.,...~...~...~ ...... ~..., ....... ~ ..........~ ,-. ~.., ...... ~..., ..,_ ~ ..~ ........ ~.. -i-~--+.-+---f-+-+--~-.~.---.--+..+.-+-.+--f--~--+--+.+-- --+-+-+.+-+-+--4---,---~ ...... +.-+.-¢---¢-i.--~-4-.-4.--4 ....... 4--4-4-.-4-.+.+--¢--+-5 ...... ¢...?~..+.---+.+.-~..., ....................... {...,...¢...;...,-.~...-~ .......... ~.-.+ ..................... -f'+-f"f-f"f"f"f"f'""-f"f"f'?f"f-?¢"~'" '-f-'f"f-'f"l-~'"f"f"~ ...... Sf"f"f"~-f"f"f-f'""?f"f"f"f"f"~"-f--+"' '"~--i---Sf"l-f"f'-f"f"-"i'":"i"':"-t ....... ;'-,--:-~ .......... T-+--f"?"~ --~'"*'"+"'+'-~'"+'"+-~-'+'-' "+"+'"~'"i'-{'"+~'i-+'"+-- '"+'4"4"'~-'~-'i'";'"~'"~" ~--~'*'"+"';'"*'-*'-*'~*"'+"~ '";'"~"'5-'~"~'"i"'i'"*"~"' "'i-'*'"~'"i'~-';-'*'"i"'*-' ,-.;...*---i...~..-{ ................... i .............. ~...i.-...4 S ¢'f-~-+..f..f.-~.-?. ...f..f"f"~'"f"f'+"f-'f"~ ."f'-~-.f"f..f.i...f..f.! ...... f"f'f"~-~'-+-f'~"'~ ....... f"f"+-H'"T"-~'"+"+" '"+-'~"~"'f ¢'f"f"~"'h '"'f"f"!"'~'q"'~'"~'":'"~"' ...f x...f..f +..:...;...~ -~.-~..~.-~ ...... ~...~.~-.~..~ -.~.-~...~...~.-,~.~-.~.~-- --~-~.~...~......~...~-J...~..- --~-~-.-~...~-~ -~ -~-.~-~ ...... ~-.~-~-.~...~...~...~...~-~......J-.;..~-~ .... ~-.~...~-.~....-.~...~...~...~...~-.;...,.-~...~......~.-, -4-.~...' ........... ~...~...~ · --H---H .....~ f--f--H--...-H..-f..f~---H---f-+.-.---f-¢-~.--f-~--.f-H-.~ ...... ?.f.f..f+.H...f..f..~...~...f.f++.f.f.f¢..~...f.f~...~.+.f.f.f.~.......~...~...~...;~..H~...f-~ ....... ~.-.~.-,f,;.--~,+-~..!...~...~ _~._~_~,..;._~...~...;..j...;._....~...;...~...;...~...;.j__~...;_ ...~...+..j...;_.~_~...;...~...~...~_.~_~._;...~._~_~...;_~_~ ..... ~..+..~_+..~..+.+.+.~ ...... ~..~..+..;..~...~.+~...~_._+.+~..~_~_~.~ .............. ~,..~..;...~...~...~...,..+ ....... "-f"f-'f"~'q"'f"f-~'"f":-f'¢'+"~"+"f"f'f-'f'" '"f"f"f"f-+"Sf"f-'~ ...... f--f-f--f--~--f--f--f.-f-.~...i--+-.~.-,+.-,f-.~.-?..~-..~ ....... ~.-+.+-.~...i--~.-.~ ...... ~.,.,..~...~ ..... ~_.i_~ ............................... ~.x...,..~...,..~ X_.LL_LLL.LL:.z ~...;._~_LL~...LLL..-..i-L.~..LLL.L.LL _.LLL.LL~ ~.,.;..;x...-- ' ...~..LL.LLL.:..L.L,..:..,L~...LLLL.L..L .x..,~ ....... ~...L~.x...~...;... -~...~--i-i...i.-.i...i..J...i--,..~-.~...i-.~.-I...i.,.i.-J...i....,.~...~...L.~...~-.~...~...~...i.-~.L~.~ .~-~...1...~...~...~-~..,, ...i-.~..-L.-i.-J...;-;.-~-;-. ,.,~,..~.,.~..,~.,.;,..L.~,,,L..L ............... ;...:..,~..~...~...,...~.- ...?.?~.,.?.~...?.~...~...~.......+...+...f...+...~...?..?.~...~.....~...f.~.+~..~ ~~ ....... ~...+...f...~...,...~...+...~...f ....... ~_.f..~.,.+ ...... ~..f.,.?.~ ...... ~,.,?.?~...,...+...?..~ ........... ~ ........... ~ .............. ~..? .... --f.-f-~-f-+-f-+-+-¢-...-.f..f--~--+~-~-~.~-~-~.f..~-~-f-f..~m..-...f.~-.~-~.~..+..~+.....+..?+..~...t~-f..~".~-.-~...?.?"~...~..+.~ ....... h~...~ ...... ~...~ ........... ~,.-~ .... -T-.?T-T..~.-T.-T-T-T--~ -T~T-T-i-?-%-?-%-T-. -.-?-..?-~.-.? ?~-~--T-~-- --T--T-..T---T.-?T--?~..-T...q ,--r..T-.T-T,--~.-r,.T..-T-.-T,-.~ -,.~--~ ....... '"T-'T"T?"T"%'%'T'"~"'q '-?'"~'"?~"%'"~'"i-~'"+'"' '"~-+'"~'"~"?"'+'"f"'?-~'" ""+-'+"'~"-~'-T-~-?'f-~ ...... ~'"~'"+"'+"T"~"+'"*"~ .......... + ........ ~'"~-'~-'+"?"'+"' "'T"'"'i'-?'"?"'"'~"% .......... ~ .......... ~'"~'"T'~"'~'?- -'FT-~-T*~'-F'T? '~'T'T-F"FT'T"~-?-T-'"'T'T-~'"FT-F'~"T-F""'~-T-F~-T-T?T"~ ..... ?'T"?'~-T"?"~-'~"T'"-FT"r-TT'~-r'?-; ......... T?'~-T"r"F'~ .......... T"F'~'?T"FT'T-~- -~-~"'~-~'"~'"?"~'"t"? -T'~-'?'"%'t'"*'"~'-~'~-" -"t-+'S--+-t--'~--S--s---+'-' '--~-~t--f-t-~'-~'-S'--~-'- '--?-*-"+-~"~---~"+'"f--+ ....... ~-?-S-+.-~-*-.~---+-.+ ..... ~.--?-%-%-T"%-~-'?'-'*-" ",,~--~--~-'~-~--~--~'-~---~'-- -+-+--+-+-.-f--+--+---+---+.-. -.+---+---+-.,+-.-f.,,~,-e-.~--,~...,-.-+..-~.--~---~---~-+---+---~-.~-.. --b-f-+--$-+.-+---+---~.-4-.-k~--4---$-..e..f.-.f.-.$.-.f--.; ....... ~-.:.-4.--~.-.f-~-~.-¢.-~ .... +...~..-+-..¢..-f.-*-.-;---+--: ....... ~--.~-+---+--i...+-y-~-+- ::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::: "+"S'-'+-S"'~-+-"S'--+-'S--- --S-'-+'-'-~-"+-'t"-+--'+---+---S---' '-'?+---~---~---t---S---+--4---+'-...-¢-S.,,+.,.+,-?-,-~--+-+-~ ....... ,,,+,..+-+-..~...¢...+.-.S...~...4 -S-.*..+..+,.,~.,.t,,,*..4.-+... -.*...~-+...??..* ........... ~.-....+,..~...*..-f..., ....... ~,-*.-~... --$-'f"?'t'"t-"f"f-'f" bf'i'"f"f'i'-f"~-'f--f--"--f'+--f--f-'f--f--~-'-f--f-' ~..~...f..f..f~?f..f..f...-f..?.f.f..f~.+.~.~...f.~+..~...f.+~.~hT..~...f~...f..~ ..... ~'"?'r"'f"?'~'"~'" '"~'"t"'?i"-?'t'"r' X...L.LLLL.L.L.;......;..;...;..;...L.LLL;.... X...LL.LLL..LLL _.LJ...LL,X...LLL....LLLL.~...;X...L; ...... ;.;...;...Lt.L.L;...;......;...LL;...~...L;...:...: ....... · --,-?-?-?-¢-.,.--;-.-,--..?b,.-,-.-;.-.;.--,.-?,---~ ........... ;-..;---~---;--4-;.--?.-~ ...... ;---~..-~...~.--L-~---?-, ........ ?..?..~...?~...?..,--.?.~...¢...~ ............ r-;..-;--.,--.*.-. ...~..-¢-4...;.-.~ ...... , ....... ~.-- ...; ............ :4.-.-;...~..-;...¢.-. ~---f-Sf--f-f--~-+--f-- -f.+-+-'f-'~.~---¢--'f-'+-.-.--+--f..f..~q--.f.+.-f--¢- --f+--f-~-f-f-f-~-~ ..... f-.+-+-.-f+-.~-.4---~.+.-~..+-.~--+.-f..~--~-f.~-.~--.~...~.-f..;..-?..-; ............... ,...;-.;."~'..f.'*..'f.-f-~ "t-'t-~'"~'-f'f"t'"f"t'" ..?..~...~...~...~...t..1...t...~.......t..~..t"?.t...t-~..~....t-.t-~.-t-?..~...~...~ ...... f"~'"t"'t'l"~"'~"'!"'~'"~"! ....... ~"'t'"?'?'t ......... ~'"T"r""'T'T"'"".'"'r ....................... ~'"~ ....... ;'"':'" ....... ...... .................. . ....... ..... ....... . ....... ,... ....... ._....... _. ...... . ..... .................. ....... . ...... . .... ....,d .................................. ~ ........................................................ -~'"+'"T'~'" ~ "~'"~"+-~'" -~-??'~"t'"~'"+'~"~'"' '"~'~'~'"~"1-~'"~"'+-~"* -'+-'~-~-+-~-+'?'~-+'" '"'~"+"~"'~'"~'"+"'~'"~"'~-' '"~"'*'"??'"t ..... ~'"~ .......... %'*'"~ ....... t ....... ~'"'"'~ .......... ? ....... ?'"r"~'"~"';'"~ ~ ! ~ ~ I , : : : : ; : : ~ ~ ~ ~ ] ~ ~ ~ ~ /~ i ~ ] ~ ~ ~ ~ ~ ~ ~ ~ ~ : ~ ; ! ~ ~ ~ ; ~ . : , ~ · : : : ' ; : ; I ' ~ = ' ~ ; ~ : I ~-f"f-f-~-f"f'i-f" 'i?"f"f-F"f'"?~"f'""?f-f-f-t-'f?fi'"-'f-'f"f-f .... f-f-i-f ....... ?f"f"~'r'%"f"i"'f'"'"?'f'?fT'f-'?'i-'i .... ~"+"?"?"r"~'"~ .................. ?'i'"~-T"i'"*-'r"!"' -f-f"f-f"f"f-f-?i-, , -f?f'i'"f-r'i-'f"f'" "i"?f"f',~'f-?'f'? "'~'f"i-'f ..... i'-?i-f" '"f'i'"f"f't'"?'i"i'"?~ "'~-'f"!-f"~"'~"T"r"~ ....... ,"'f'"~-"+-"~'"i"+'+-'f" "'~'"r'"F": ....... -~.-.~.-+- ~--+-~.~... -.+-.+...+-..f. -.~...+-+--+-....+.~ -~.~....~-.~.-+.-..-+-¢.-~...~ ....... ~...~-+- --~--;.~-~-.~ ..-~-.~-.4...,...~-.~...~...~-+... -+...+..~...+......~...+...+.?.....~ ........... ~...~...~...~...+...~... -~-~-~-¢--~-.;-..;..4--4- .4--4--4..4-~..4.-4...~...~.......~..~..~...;-i-.~...;-4..~- ...;-~.4-~-.,-.~...;...;-~ ...... ;.~-..;-.;..~-;-..;..4.-.¢ ...... ;-.¢-..~-.~...~...~-.~...~.-.~-- -.+ .......... ~--.+ ....... ¢ ....... ~ .......... ~...~...,...~ ........... ~-.~ ~--i..-i-i--~-i...L-4-.i- -4..~-..i.-.;--L4...;-;...~-...;.--L.L..; ...... L..L~_i... -.i-.~.L..L.'.-i-~...L.; ....... ;...;,.4,..~- -;-.;...i...; ...... LJ...~-.~ ....... ',...;..4...~ ...... ;.,,;._L..L..;....; ....... L..; ....... ;...; ....... ;...; ............ -4--+..~-~---~.4.--+---~--+--- '--~---~-..~---~-~-.-+.--f-~-+--..-.-~---+.-+-~-¢-+..~-.-+-... -.+-+-.+.--+-~.--f.-~...~-~--- --~---~.-.~-~--~---~-.~-..~..-¢ ....... +...~...+..-+-.+-.~...t...+.--~.......~...~ ....... ~..-f...r--,...~ ......... ~ ---~.-.~-.-f..-~...~--.*...~.-.t .... -~...~.-~-~- -~.¢..¢-;-.-;4-.~..;- ;-.4-;.-~...4.~..;-~-~-~.~ -~.~-¢.-'.-~-;..4-;--.~.~-.&.....;...~.-~.-.¢-,..~-.;..¢.-;.. '-.;-4...;...;-.. -.~......¢ .................. ~...¢......~...~-.¢...;...' ....... +H-{-~5-'H-f"cH+¢VH-+'+~..f.H...~+H..+...-.H-.H-~.+.H-f..~-.~-4.+.~..~...¢-.~-.f.+...F+.~..+..+..~..~...f+";-..-+...~...*.~....~...?..~...~.... -T"FT"TTT'T'T'T" 7F'TT'T"I-FT'~-F""T'T"T"~'TT"TT'T'""'F'r"F'?TT"?'* ...... F"T"F'?T?"?7'" FT": ........ "'I"'?"F': .......... T"T":"'I ...... ?"~ ........... ' ........ T"*"'?~': .... -rDoo 0 so0 1000 I soo 2000 2.c;00 5000 ~soo HEST EAST WELL" D.S. 15-25 .--'-- --'- VERTICAL PROJ£CTION (q821' FNL, 1414' FWL, .C 22, TllN, R14E,UM) 265. -500 0 0 500 1000 1500 2000 2500 3000 3500 85. PROdECTION ON VERTICRL PLANE 8S. - 265. SCI:)LEB IN VERTICAL DEPTHS HORIZ SCALE = ]/S00 IN/FT ~--" STATE OF ALASKA "~" AL~,_.,A OIL AND GAS CONSERVATION COMMI5,... ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate __ Plugging __ Perforate __ Pull tubing __ Alter casing __ Repair well __ Pull tubing __ OtherX'_ 5. Type of Well: Development Exploratory Stratigraphic Service 2. Name of Operator ARCO Alaska, Inco 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1821' FNL, 1414' FWL, Sec.22, T11N, R14E, UM At top of productive interval 1526' FNL, 1672' FEL, Sec.22, TllN, R14E, UM At effective depth 1455' FNL, 1241' FEL, Sec. 22, T11N, R14E, UM At total depth 1441' FNL, 1154' FEL, Sec.22, T11N, R14E, UM 12. Present well condition summary Total depth: measured true vertical 9760 'MD feet Plugs (measured) 8934 'TVD feet COMPLETE 6. Datum elevation (DF or KB) RKB 62 ' 7. Unit or Property name Prudhoe Bay Unit 8. Well number 15-25 9. Permit numbedapprovai number 88~80/8-628 10. APl number 50-- 029-21842 11. Field/Pool Prudhoe Bay Oil Pool feet None 9637 'MD feet Junk (measured) None 8848 'TVD feet Size Cemented Measured depth 20" 2150 # Poleset 1lO'MD 10-3/4" 1000 sx CS III & 3521 'MD 600 sx Class G - Top Job w/350 sx CS II 7-5/8" 630 sx Class G 8935 'MD 5-1/2" 200 sx Class G 8597'-9758'MD Effective depth: measured true vertical 9607'-9623'MD 9626'-9628'MD Casing Length Structural Conductor 80 Surface 3488 Intermediate Production 8902 Liner 1161 Perforation depth: measured true vertical True vertical depth 1 IO'TVD 3521 'TVD 8312 ' TVD 8028 ' -8932 'TVD 8832'-8845 'TVD, 8848 '-8850 'TVD Tubing (size, grade, and measured depth) 3-1/2", L-80, tbg w/tail (~ 8718' Packers and SSSV (type and measured depth) Camco 'TRDP-1A-SSA' $55V (~ 2217', & TIW '55-BB' pkr 8 8597' 13. Stimulation or cement squeeze summary /A I n~rvals treated (measured) Treatm(~nt description including volumes used and final pressure Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure N/A 16. Status of well classification as: Oil~__._ Gas __ Suspended 14. Tubing Pressure Service Date SUBMIT IN 6UAICATE Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run'~ Daily Report of Well Operations*-- Gyro 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~igne~orm 0-404 Rev 06/15/88 "7~, P ~~-y#. Title Regional Dri 11 lng Engi neer(Dani ) SW03/070 ~Completion Well History ARCO Oil and Gas Company Well History - Initial Report - Daily Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. ARCO Alaska, Inc. NORTH SLOPE District PRUDHOE BAY UNIT IState Field AS2009 ICounty, parish or borough ADL: 28306 Lease or Unit COMPLETE Title API= 50-029-21842 DS -Iw~IT no. Auth. or W.O. no. ARCO Operator ACCEPT WESTWARD 11Date ;)9_ _nn__n0 I ARCO W.I. Hour [Prior status if a W.O. Spudded or W.O. begun 09/22/88 1430 HRS Date and dept~/9~t/RR as of 8:00 a.m, TD: 9760 9716 SUPV=TJ 09/24/88 (8) TD= 9760 PB: 9716 SUPV:TJ pleterecord for each day r~orted RIH /W GR/JB 5-1/2"8 9758, MW= 9.0 NACL H?RrT_ RIG ~C=~T 1430 ~, 9~22/88 ND TREE. NU BOPE. TEST CSG TO 3000 PSI. RIH /W GR/JB. HIT ICE 8 225'. RIH /W 3-1/2" DP TO 511'. CIRC OUT ICE /W SEA WATER. RIH /W GR/JB TO 8590'. RECOVER SPRING & RUBBER. RIH /W GR/JB. DAILY=S81,986 CUM=$1,554,680 ETD:S1,554,680 EFC=$2,224,000 TEST INJ LINES 5-1/2"8 9758' MW= 9.0 NACL POOH W/ GR/JB. RIH W/PKR & TAILPIPE, SET PKR 8 8573'(WLM), RD WIRELINE, RIH W/ 3-1/2" COMP ASSY, SPACE OUT, MU HGR, CONNECT CONTROL & INJECTION LINES & TEST. CAMCO 'TRDP-1A-SSA' SSSV 8 2217', TIW 'SS-BB' PK~ 8 8597', & TT 8 8718'. DAILY:S131,434 CUM:$1,686,114 ETD=S1,686,114 EFC=$2,224,000 Thesig~:~above is correct ~',~ j,~ . For for}n preparation and distribution, _se.e...P ro c_e d u re s^ ~M a_n_u~al,,, ,Se ct i on 10, JDat~ \ '\ ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. Accounting cost center code District A~CO Alaska, Inc, IIC°unty orthO'hi-] SLOPE Stat~ ~v Field PRUD}{OF- BAY UNIT Lease or~j~iL.' 28306 DS 15-2 eu no. Auth. or W.O.A~2009 ITM CO['~]'3LETE I ~PI; 50-029-21842 Operator ARCO Spudded or Date and depth as of 8:00 a.m. 09/25/88 ( 1 TD= 9760 PB: 9716 SUPV=TJ IA.R.Co. Date Complete rec~lJ~l~tZIW[aJJql:)dalc reported g2.0000 09/22/88 RIG RELEASED Iotal number of wells (active or inactive) on this i ost center prior to plugging and ~ bandonment of this well I our 1430 }{RS IPrlor 8tatu8 If a W.O, I 5-1/2"@ 9758' l~T~: 8.5 SEA WTR/DIESEL DISPLACE TO SEAWATER/DIESEL. LAND TBG, ND BOPE, NO TREE & TEST. RELEASE RIG ~ 1800 }{RS, 9/24/88. DAILY:S120,497 CUM:$1,806,611 ETD:S1,806,611 EFC.'$2,224,000 Old TD New TD PB Depth Released rig Date Kind of rig Classifications (oil, gas, etc.) I Type completion (single, dual, etc.) I Producing method I Official reservoir name(s) I Potential test data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length I Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. ARCO Alaska, Inc. Prudhoe Bay Engineering ' Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager November 18, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 15-25 Permit No. 88-80 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. This outlined work is planned to be conducted before the well is stimulated with a hydraulic fracture treatment. A separate Sundry was submitted and approved on 10/26/88, No. 8-807 for the hydraulic fracturing. Very truly yours, D. F. Scheve DFS/DRR/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 15-25)W1-3 WELLS3/85 A~CO A~aska, |nc. is ~ Subsidia~ o~ A~a.~ic~ich~ie~dCompa.y AR3B---6132-C STATE OF ALASKA ...... AL..-,KA OIL AND GAS CONSERVATION COMb, .~ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Alter casing __ Repair well Change approved program __ Operation shutdown __ Re-enter suspended well __/ Plugging __ Time extension ~ Stimulate ._V._ Pull tubing __ Variance __ Perforate ~ Other 2. Name of Operator 3. Address P.O. Box 100360. Anchorage, AK 99510 4. Location of well at surface 5. Type of Well: Development Exploratory Stratigraphic Service 1820' .FNL-1415' FWL, Sec. 22, TllN, R14E, UM At]dp oT proSbcbve interval 1609' {NL, 1320' FEL, Sec. 22, TllN, R14E, UM At effectk e depth 1504' FNL, 1342' FEL, Sec. 22, Ti1N, RI4E, UM At total depth 1498' FNL, 1276' FEL, Sec. 22, TllN, R14E, UM 6. Datum elevation (DF or KB) 62' RKB 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number DS 15-25 9. Permit number 88-80 10. APl number 50-- 029-21842 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 9760 feet 9001 feet Plugs (measured) Effective depth: measured true vertical 9 717 feet 8965 feet Junk (measured) Casing Conductor Surface Production Liner ~ngth 80' 3488' 8901' 1161' Size 20" 10-3/4" 7-5/8" 5-1/2" Cemented Measureddepth ~uevedicaldepth 2150# Poleset 110' 110' 1000 sx CS III & 3521' 3521' 600 sx C1 G Top job w/350 sx CS II 630 sx C1 G 8935' 8307' 200 sx C1 G 8597-9858' 8023-8999' Perforation depth: measured 9607-9623'; 9626-9628' true vertical 8873-8886'; 8889-8891' Tubing (size, grade, and measured depth) 3½", 9.2#, L-80, PCT @ 8718' Packers and SSSV (type and measured depth) TIW packer SS-BB @ 8597' MD; Camco SSSV TRDP-1ASSA @ 2217' MD 13. Attachments Description summary of proposal Detailed operations program __ BOP sketch ..~ 14. Estimated date for commencing operation November !..988 . 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil __ Gas __ Suspended __ Service 17. I hereby c~rtify that the foregoingjs true and correct to the best of my knowledge. ,,Si,gned ~/)¢'/~~,,(~~,4.~__/~ T!tleoperations En~..i. neerin~ Manager Date /~/ FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness [Approval No. I Plug integrity __ BOP Test __ Location clearance __ Z/.¢ L) Mechanical Integrity Test ~ Subsequent form required 10- Approved Copy Returned ORIGINAL SIGNED aY .__./~_.,~, ~,. ~ Approved by order of the Commissio~e0~NIE C. SMITH CommiSSi~-~ner Date //-- ¢,~3~¢ Form 10o403 Rev 06/15/88 WELLS3/85 D. R. Reimers, 265-6205 15-25 MUD ACID TREATMENT DESCRIPTION OF PROPOSED WORK Arco Alaska Inc. intends to perform an acid breakdown treatment on DS 15-25. The treatment will be performed as follows: 1.) 2.) 3.) 4.) 5.) Rig up slickline unit. Pull orifice valve and fill 3 1/2" x 7 5/8" annulus with diesel. Run dummy valve. Rig up pump trucks and transports. Load and titrate acid. Pump mud acid breakdown treatment as follows: a.) b.) c.) d.) 500 gals. xylene 3000 gals. 12% HC1 with additives and 70 ball sealers 6000 gals. 12-3 mud acid with additives and 200 ball sealers 4000 gals NH4CL water 800 gals. slick diesel 5000 gals. slick diesel Open well to flow and nitrogen lift if necessary. .5 4 2 COILED TUB].NG UNIT BOP EGU ! pH£NT 1. 5000 PSI 7" W£LLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" FTYD~L~ SLIPS 4. ~)00 PS1 4 1/6" SHE:AR RAMS 5. ~)CK) PSI 4 1/6" BLIND RAIDS 6. 5000 PSI 4 1/16" STUFFING BOX N]REL]NE BOP EOU]PHENT 1. 5DC)O PSI ?" WELLHEAD OONNEC:10R FLANGE 2. 5C)00 PSI WIRE:LINE RAKIS (VARIABLE SIZE) 3. 5000 PSI 4 l/E," LUBRIC'ATOR 4. 5000 PSI 4 1/6" FLOW 'I'UB£ PAC:K-DFF AI:;.'.CO AI_A,S'I-( A., ].: NC: ,, F'., C' ~ BOX ~ ;.:':'.., ,:'::, '~ 6 :.':.~ A i"..,~ C H 0 R A G. E, A L A ~.' K A DATE' ~ ~-~0-88 ," ,... I::. ~-.~,::. I::. ,'.? Z (-;. N A i'-,i D F;.: iE 'T't i F;.' N 7' H E A T' T A C H E £:, C 0 P Y R R i-'i: C i= .'1: F' T t:,."t.J N i., I:,.'.U N i , R U N i , I:;.'.tJ N i , 1:'..' U i"'~ i, F;..' U d 'i, R U N 'i , F;..' {.iN 'i , I:kLJN i , R U N 'i , RUN R U N RUN RUN R U~':4 'i R U N RUN I:;.'. U N R U N t:;:. U N ~'.tJM RUN i , 1:;.'. U N .... I)A T'r::l ,. i~..' II ....' t;;. C~.' , .... r:- il t=' II ~.5" ,.,:. I;;' II ...:' r".' i 1. il i-.o # ~;' ...:- ..) I:.' 11 ../ ...~' ..;' F'~ i" L. A C A t'i C AT' L_ rq ,~..' A "ii_ A ,':~ C: A f~ C t.'J A 'i" 1._ A S' A T' L. A 3' C A M C: 0 A T L A ,? AT L.A A i' I_ A ;~,' A 'T L ~q ,? C A ~"i C 0 CAMCO CAMCO SCH (.~ ]..~ . ,.:. ~ H SCH' U A ffi tJ 0 C A M C r3 C A M C 0 H A V lie A .F.~ ]: C: FZ D A Y ! .D :[ i-':'T'R ]1 B i..j 'T :[ 0 N ARCO ALASKA, INC~ P.O. BOX t~OJ6~ ANCHORAGE, ALASKA ¥Y5t0 DATE: ii-i0-88 REFERENCE: ARCO PRESSURE DATA i-i t0-24-88 BHF'--STAI'IC GRADIENT ~.0-b8 BHF'--3"TA"I"IC GRADIEN F i --i 9 i 0-'~ '~ 2-4 i0-24-88 BHF'--STA'¥ZC GRADIEN'I' 4-i7 i0-i2-88 BHF'--PRES,S'URE F'ALL-OFF 4-,-5 i . 9-2i -88 BHF'--STATIC GRADIENT 4--1'5'~ ~-'-'i-88~ .~ BHF'--STATIC'. GRADIENT 5-ii i0-i~-88 BHP--$TATIC; GRADIENT 5-iS i0-i9-88 BHF .... STATIC GRADIENT 5-i5 i0-t9-88 BHF .... SI'ATIC GRADIEN'F 6'-i'7 i':.}-i0-88 BHF .... STATIC GRADIENT 7-2 i 0-9-88 BHF'--STAi'IC GI;,'ADIEN'F 7""8 i0-9-88 BHF .... STATIC GRAI)IENT 9-'3 i ':'}-5-88 BHI: ..... FLOWING GRADIENt' 9-29 8-'28-88 BHF'--STATIC GRADIENT 9-,3:3 8-28-88 BHF'--STATIC GRAD:[EN'F i2-..S i,:.}-i4-88 BHF .... FLOWING GRADIENT i 2--6 i ,:'}-i :3-88 BHF'--FL(]WING GRADIENT i 2--t (-) i (.)-i 2-88 BHF'--F'LOWING GRADIEN"F i''~-'''' '~ i 0--i 9-88 BHP--STATIC GRADIENT i.3-ii i0-6-88 BHP--STATIC GRADIENT i 3-26 i ~..}-6-88 BHF'--STAI'IC GRADTENI' i 3,--28 i 0-6-88 BHP--STAI-IC GRADIENi- i 4-i 0 7-i ,:.}-88 BHP--F'LOWING GRADIENT i 4--i S 6-._%(~-88 BHF .... STAT I C GRAD.'I_' ENT i 4-i 7 i 0-2,:.}-88 Bi-IF- .... £'i'ATIC GRADZP-NT i 4--i 8 i 6,-7-88 BHF .... 3,'TAI"IC GRAI'_')IENT i4-S2 i0-7-88 BHF .... STATIC GRADTENT i5.-7 i0-8-88 BHF .... STATIC GRADIENi' i5-i0 i0-9-88 BHP--,S'TATIC GRADZEN'F i5-i5: i,~--8-88 BHF .... ,.?TATIC GRADIENT i5-i9 i0-8-88 BI-IF'--STATIC GRADIENT i "~'- :~..,. ~,. i ,:.}- i. ~, _,.,,..,oo BHF .... STATIC GRADIENT i5-25 i6,--26,-88 BHF .... STATIC GRADIENT i6--7 i0-22-88 BHF' -FLOWING GR~.,I]IENi' PWDW..5.-i i0-tS-88 BHP--$TAI'IC GRADIENT Pt_EASE SIGN AND RETURN THE A'TTACHED COPY AS RF.."CE I VED BY Al'O-i 529 ,~ 'T'RAN$ 4:88642 RECE I F"I" Of:' AF'F'ROVE~__ D I S'I'R i BU'[ l ON P.'--~TRAL F IL[::.',S' ~- D & M FXI'EN£' I ON EXP!...ORAT ii_' ON ~- EXXON MARAI'H, ON · "> MOBIL $ !:;' PI ;1; I... t... [ F' .? ¢,- H.: AD ~ S A F' C · ~ STATE OF AI_A:~.'KA ~ I'EXACO CAMCO C A M C: 0 CAMCO CAMCO OTIS [)TIS CAi',ICt] CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO C A M C 0 CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO DA'i"A ~, ARCO ALA~'KA, P, O. BOX ANCHORAGE, ALAS'KA 9951 DATE' i0-2t -88 REFERFNCE' ARCO CAS'ED HOLE FINALS' i -':'~ t 0.-.-)-8-88 PERF RECORD RUN i ~ · 2-i4 t0-5-88 COLLAR/F'ERF RUN i , ".~" ,S-7 9-'i8-88 INJECTION PROFILE RUN i , 5' :5-t 5 t ';7)-7-88 COI_I_AR/F'ERF RUN t 7-33 9-27,-88 COLLAR RUN i, 5" 9-i 9-i 6-88 PRODUCTION PROFILE RUN t, 5' 9-9 t0-t7-88 PERF RECORD RtJN i, 5· o_i, ~.z, o_.vi, ,.. -88 PROI)UCTION F'ROFILE RUN t , .,."~" ·-,..7 9-..'.~-88 F'RODUCTION PROFILE I:;;tJN i,._'~- "~ ;":~ ,, i 0-8-88 COL L. AR/PE RF RUN t.7-2A i0-6--88 PRODUCTION RUN i , 5" i~-9 t0-7-88 CNL-GAMblA RUN t , .5 · i 5-i 2 i 0-7-88 COLLAR/PF'RF RUN t.5<-22 t0-6-88 COLLAR/PERF RUN t , 5" t ~-'2.5 i 0-t 7,-88 COLLAR/t:'ERF' RtJN i , .5' PWDW2-t 9-i 8-88 TEMP RUN t, 5" PLEASE S'iGN AND RETURN ]'HIE ATTACHED cor"Y AS RECEIP"F OF DATA, S' C H CAMCO ATLAS' CAMCO CArdCO &'CH CAMCO (]AMC(] ATLAS' Al'LAS' AI'I_A~' A'TLAS' A]'LAZ CAMCO RFCE:IVED BY ;~','"ALl.."f' HOF'FECKER ~ 0~~ 5,.lgSb(-...~ -'~-- A TO- i 529 ~ &las~,~a, Oil & Gas 6on,.,. 6ommissioa TRAN$ $886t 8 /'~ Anchorage AF'PROVED ...........~. DISTRIBUTION '"'-,,. CENTRAL FILE2' ~ PI--IILI...IF'S' · ,-'"' CHEVRON F"B WELL FILIE'~'' D & M R & D. ~- EXTENSION ExPI'0RA~TION $ SAF'C ~-~' EXXON ~-~' 5'TATE riF'.. A [..A,*Z K A MARATHON .~ TEXACO ~~ ~OBIL 7'FIE WRONG AF'I ~ IS F'RIN'I"E:D ON TI..tIS' 1_0[;,. THE: CORI.,:ECT ~: i$ 5(.)-(:)29-"20324-()i. /~RCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 14 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 15-25 Permit No. 88-80 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve ~ ~o~ DFS/RAC/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 15-25)W1-3 WELLS3/34 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE Of ALASKA ALASKA OIL AND GAS CONSERVATION COMM,oSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing © Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate !~ Other [] 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1820' FNL, 1415' FWL, Sec. 22, TllN, R14E, UM At top of productive interval 1609' FNL, 1320' FEL, Sec. 22 TllN, R14E, UM At effective depth 1504' FNL, 1342' FELr, Sec. 22, TllN, R14E, UM At total depth 1498' FNL, 1276' FEL, Sec. 22, TllN, R14E, UM 5. Datum elevation (DF or KB) 62' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 15-25 8. Permit number 88-80 9. APl number 50-- 029-21842 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 9760 feet 9001 feet Plugs (measured) Effective depth: measured 9637 feet true vertical 8898 feet Junk (measured) Casing Length Size Conductor 80 ' 20" Surface 3488 ' 10-3/4" Production 8902' 7-5/8" Liner 1161' 5-1/2" Cemented Measured depth 2150# Poleset 110' 1000 sx CS III & 3521' 600 sx C1 G Top job w/350 sx CS II 630 sx C1 G 8935' 200 sx C1 G 8597-9858' Perforation depth: None measured true vertical None : ' Tubing (size, grade and measured depth) ' 3~" 2 , 9.2#, L-80, PCT @ 8718' MD ~ '" Packers and SSSV (type and measured depth) TIW packer SS-BB @ 8597' MD; Camco SSSV TRDP-1ASSA @ 2217' ~ue Verticaldepth 110' 3521' 8307' 8023-8999' 12.Attac h ments Description summary of proposal ~ Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation October 1988 14. If proposal was verbally'approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ¢~ (~.. _,~b~ ~ "P l= $, ~ [r u-¢ Title Operations Engineering Manager Commission Use Only Date Conditions of approval Approved by ORIGINAL SIGNED BY LONNIE: C, SMITH Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance :~.p p,-oved Copy Returned Commissioner IApprOval NO' ~:~" g~ Z Form 10-403 Rev 12-1-85 WELLS3/34 R. A. Clausen, 263-4538 by order of the commission Date / Submit in triplicate/ Drill Site 15-25 Ivishak Formation Zone 1 Hydraulic Fracture Treatment Preliminary Procedure , . . , , . . , Perforate 9607'-9623', 9626'-9628' MD referenced to BHCS log dated 7/30/88. (These perforations are being covered by the drilling application for approval.) Rig up pump truck and run injectivity test. MIRU fracturing service company Pump propped fracture treatment into above Zone 1 perfs using gelled fluid and 20/40 mesh Carbolite proppant. a. 70 bbl Pad b. 30 bbl Slurry at 2-10 PPG c. 93 bbl Flush RDMO fracturing service company. MIRU slickline unit and tag fill. If fill is below perfs, MIRU conductor line unit and run temperature log to determine fracture height. Cleanout with CTU if needed. Pull dummy valve and replace with gas lift valve. Flow well to obtain post frac flowrate. 6 5 4 2 COILED TUBIN0 UNIT BOP EOU ! PHENT 1. 5000 PSI 7" WELLHEAD CONNE:CTOR FLANGE 2. 5000 PSI ,it 1/16" PIPE RAMS ,3.5000 PSI 4 1/6" HYD~L~ SLIPS 4. ~)O0 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 H]REL]NE BOP EOU]PHENT 1. ~C)O0 PSI ?" W£LLH~I~D CONNECIOR IrLANO[ 2. ~OOO PSI WIRELIN[ RAI~$ (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARCO ALAS'KA, INC, F'..O. BOX t00360 ANCHORAGE, ALAS'KA 995~0 DATE~ 9-S0-88 F;:E"'F'EF~:Ei"/CE: ARCO CASED I"IC)I_F. il F'INAI.....9 ~-8 9-~ ~--88 '~-J 0 9-26-88 ?2 9"-' .-.. "~ "?"-'88 .J-22 9'-'2S-88 S'"t 9 .... i-88 3-4 9'-3-88 ;f .... 20 9-2-88 S-22 9'-t '-'88 ~f-"27 9-2-88 ~-"3 9'-9-88 5'"~ 9 .... 9-88 6-'t 4 9-4-88 '7 .... t 3 9-2S-88 9-9 9'-S-88 t 5-'9 9-5-88 t 5-"t ~A 9-2~ -88 ~.,~'~" ~ ~A 9-2~-88 ~ S'-'~ 2 9-t 4-88 t 5 .... t 5 9-'3-88 t S--~ 9 9-2~'-88 t U-"2~ 9'"'23-88 ~6 4 9-."'~- " i 6 - t,:. 'j9- .> - ~t E t 7-'4 9-t 0'-'-88 t8-'t 9-~t .... 88 I N J E C T I 0 N P R 0 F _1; 1.. E t"-' E R F RECORD AMENDMENT TO ACBL. OF 5"'t8-'82 F:' F C PR 0 D U C T I 0 N P R 0 F' I L.. E INJECTIC)N F'ROFIL. E P R O D U C T I O NF' R O F I L E F'RODUCTION F'ROFiLE P R O D U C "!' I O N F' R O F I L E PRODUCTION PROFII_E P R 0 D U C T I O NF' R O!= I L. E PITS C O L. L A R /F' E R F' F'R O D U C T I O NF:' R O F' I L E PR O D U C'i' I O NP R O F' I L E ..... P 0 S T - S l' I H. V E R T I I_ O G MAGNEI...OG PRODUCTION F'ROF'iLE P R O D U C '1' i O N I=' R O I= I L E COMF:'LIETION RECORQ C O L [. A R GAMMA RAY F' I T Y P I I::'I..EA,S'F 5~IGN AND RE'i"URN 'FFI~, I~C-I~(tlVi~ D)F'Y A,~ RECEIF:'T OF R E C E: J: V E D Y. ........................................... u Z..j.9 8 8 HAVE A NICI= DAY! 5.:AL.I...'Y HOF'F:'ECK ER ATO- t 529 Oil & Gas Guns. Cummissimt '[RAN,.. ~-88598 .,, APPROVE'D (~:' D I £' i'R ~ BI.J'I' ~ ON RUN t , 5" RUN t , 5" RUN t , 5" RLJN t, 5" RUN t, 5" RUN I, 5" F(IJN I , 5' RUN RUN t, 5' RUN i , 5" RUN t , 5 ' RUN I , 5" RUN :? 5 ' RLJN i , 5" RUN i , .5" RLJN i, 5 ' RUN ~, :5' RUN i , 5 R IJ Ni , .5 ' RLJN i, .5" RUN i, .5' I", I' ..,' R U N i , .5 ' RLJN J , 5 · DATA, C A M C; 0 SCH ~ A T [.. A,S' "~, A'I' I.. A,,~..~ CAHC;O (]AMC(] [;ANCO CAMCO CAMCO C A M C 0 C A t.i C 0 CAMCO ATLAS' CAMCO CAMCO A'TI_A '~ A TL. AS' CAMCO CAMCO ~'CH A'rL.A,~' C A H C 0 C A M C 0 CAMCO C, EN1 F.AI.. F'ILES' CI-IF"VRON D & M · ,.'"' EXTENSION EXI::'L.C)RAT'~ON ~,-'"' E X X 0 N MARAI"I~ON '"',,- P I"11 I_ L I F'B WELl_ F'ILF"'5' R & I) ~ ,.~AF'C · .-"5"i"ATE OF' AL. ASK A :~ TEXACO ARCO ALASKA, INC. F'.O. BOX tOG3&G ANCHORAGE, ALASKA DATE'. 9-23-88 REFERENCE' ARCO 2-23 8-28-88 3-t t 8-27-88 4-4 8-~ 2-88 ,,,5- 8 8-5-88 ~-~ 6-88 ~ J.-8 d - i '~ 9- t '~' --~ 9-~ 8-88 i -- i .') 9- i 7-88 4-i i 9-4-88 s 5-25 ?-I 6-88 6-7 8-6-88 995iG CASED HOLE FINAL ~; COLLAR/PERT .... COLLAR/PERT SPINNER/TEMP COLLAR/PERT COLLAR,/F'ERF ·, VERTILOG COLLAR/F'ERF COL. LAR/F'ERF COLLAR/F'ERF COLLAR/F'ERF COLLAR/PERF COLLAR/F'ERF COLLAR/PERF COLLAR/F'ERF CBT CET COLLAR/F'ERI::' PLEASE SIGN AND RETU RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER ATO-i 529 TRANS ' ~ //~ 78858~ AF'F'ROVED_.i ............ RN i'HE ATTACHED COF'Y AS RECEIPT OF DISTRIBUTION RUN t , 5 · RUN t , 5' ,-) RUNS' i&~., 5' RtJN i, 5" F;,' IJ N ,? i ct, ''') ~" RUN I, 5" RUN i, 5 · RUN 3, 5~ RUN '> :'< ' I"<tJN2, 5" RUN i, 5 · RUNS i -3, 5 · RUN i, 5" R~JN i, 5" RUN i, 5" RIJN i , 5" F( ~ , " UN$ t-8 5 DATA. GEAR GEAR OTIS GEAR GEAR ATLA~ ATLAS ATLAS ATLAS Al'LAS ATLAS GEAR GEAR GEAR SCH SCH GEAR ~ CENTRAL FILES ~ CHEVRON D & M -,' EXTENSION EXF'LORATION T EXXON MARA'¥HON ~ MOBIL '-~ PHILLIPS F'B WELL FILES R & D ~- SAF'C ~ STATE OF' ALASKA · . '1" E X A C 0 F" R 0 H RECEIVED SEP 2 3 1988 ~lmlka Oil & Gas Co~. ~miss~ ~ra~ .............. Flor ~i~or ,i':~ . .- i r , .[, ~C~c~Atoa s~~_ · ~--.LL' Full Charse Premnu~e._.2~./50 pii~ '-- i . -- i -- Pump incr, cloe. pg8~, 200 POtS m%n~sec, ~ ~--~ --. ':"..-.:Z_ tm'' ~tltY a~d Floor ~4~eC Valvel 7~-lrn i ~ ...... ~a, ll T2pa Test Pre~uze_ ..'~,.~.~_.0_,, , ~ ....... Choke F~a~old Test P~assur~'~_O00 .......... " ~" t".' ]7 .... ; ....... , ..... a~ - Opeza~or '~? '~ ARCO AL, AS~KA, INC,. P.O. BOX ANCHORAGE, ALAZKA 995i 6, DATF' ~3--i 8'88 F;,'ti.~F:'ERENCE:" ARCO MAGNETIC 'f'AI:'tLS' W/L..];,~"FIN6. 7-:.30-88 MA(;]"AF'E 72865 (Jt--I'D.[L/F~HC/'CK~L. AF PROVED .............. .!. ~,~/. ....................................................... D i ,t~TR I BU'f' l ON CENTRAL. F'I L..E,":,' CHEVRON F', E. XXON M AI.;:A't"HO N HOB I L. ~: P 1"! I L.. L.. I t::' 2 F'B WELL. i!'iI..E,.'9 R & D · r ;~' A P C ~,~ 5'TR'f'[" 0t.. Rt...A,~.;KA T Ii:' X A C 0 .:;: 1::i I::' 1:!' F.' I:E i',..l Ir".' I::i: f) t':::.: 'T I:;' 1' R1 IT T f~, N STATE OF ALASKA ALASK~ OIL AND GAS CONSERVATION COMM,~SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown [~ Re-enter suspended well [] Alter casing !-J Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing ~ Amend order [] Perforate ~ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1820' FNL,1415' FWL, Sec.22, T11N, R14E, UM At top of productive interval 1609' FNL, 1320' FEL, Sec.22, T11N, R14E, At effective depth 1504' FNL, 1342' FEL, Sec. 22, T11N, R14E, At total depth 1498' FNL, 1276' FEL, Sec.22, T11N, R14E, UM (approx) UM (approx) UM (approx) 5. Datum elevation (DF or KB) RKB 62 ' feet 6. Unit or Property name Prudhoe Bay Unit 17~ _W2~I I number 8. Permit number 88-80 9. APl number 50w 029-21 842 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 9760'MD feet 9001'TVD feet Plugs (measured) None 9637'MD None Effective depth: measured 8898 ' TVD feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Conductor 80' 20" 2150 # Poleset 1lO'MD llO'TVD Surface 3488' 10-3/4" 1000 sx CS Ill & 3521 'MD 3521 'TVD 600 sx Class G Top job w/350 sx CS II Production 8902' 7-5/8" 630 sx Class G 8935'MD 8307'TVD Liner 1161' 5-1/2" 200 sx Class G 8597'-9758'MD 8023'-8999'TVD Perforation depth: measured No ne true vertical No ne Tubing (size, grade and measured depth) Packers and SSSV (type and measured depth) None None 12.Attachments Description summary of proposal [] Detailed operations program [] BOP sketch WELL HISTORY 13. Estimated date for commencing operation September, 1988 14. If proposal was verbally approved Subsequent Work Reported on Name of approver Foz'z~ l~!e. /(~- 4/04//' D:~ II ,,~, ~ Date approved 15. I hereby certify that the foregoing is true and corre(~'t to ihe best of ~y' k~o~ledge Signed (~~ ~/-~.,(X./,~,{~ Title Associate Engineer ~ Commission Use Only (J6) 5A3/0029 Conditions of approval Approved by ORIGINAL SIGNED BY LONNIE C, SMITH Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved Copy Returned Commissioner Date ~/iJ/~ J Approval No. Form 10-403 Rev 12-1-85 by order of the commission Date ~¢~//~ ~'J ~ Submit in triplicatey ARCO Oil and Gas Company Well History - Initial Report- Daily Instructions: Prepare and submit the "Initial Rel;ort" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District Field ARCO Alaska, Inc. ICounty. parish or borough NORTH SLOPE Lease or Unit ADT.: 28306 Title DRTT.T. PRUDHOE BAY UNIT Auth. or W.O. no, AS2009 ]Sta~K DS 15-2~well no. API: 50-029-21842 Operator ARCO Spudded or W.O.sPUDbegun IDate 07/18/88 JHour Date and depth as of 8:00 a.m. 07/19/88 ( TD: 1400'( 1 SUPV:CTD 07/20/88 ( TD: 3529'( SUPV:CTD 07/21/88 ( TD: 3529'( SUPV:JCP 07/22/88 ( TD: 3540'( SUPV:JCP 07/23/88 ( TD: 5215' ( 1 SUPV:JCP 07/24/88 ( TD: 6865' ( 1. SUPV:JCP !Complete record for each day reposed NABORS 28E ARCO w.i. 22.0000 Prior status if e w.o. 1530 HRS ) [oo) DRILLING 20" @ 110' MW: 9.2 VIS:230 FINISH MOVING RIG TO DS 15-25. ACCEPT RIG @ 0700 HRS, 7/18/88. NU DIVERTER & TAKE ON WATER. MIX SPUD MUD. PU BHA. TEST DIVERTER. FILL HOLE AND CLEAN OUT FLOW LINE. SPUD WELL @ 1530 HRS, 7/18/88. DRILL TO 585' TRIP FOR BIT. DRILL TO 1400'. DAILY:S66,316 CUM:$66,316 ETD:S66,316 EFC:$2,224,000 ) ,29) SHORT TRIP 20" @ 110' MW: 9.4 VIS: 87 DRILL TO 1649' TRIP FOR BIT #3. CHANGE CUTTINGS DISPOSAL HOLE. DRILL TO 3529'. CIRC BOTTOMS UP. SHORT TRIP TO HWDP. DAILY:S51,149 CUM:$117,465 ETD:S117,465 EFC:$2,224,000 o) NU BOP 10-3/4"8 3521' MW: 9.5 VIS: 82 CIR & COND. POOH TO RUN CSG. RU & RUN 92 JTS 10-3/4", 45.5#, L-80, VAM CSG TO 3521'. CIRC & COND. PUMP 100 BBLS WATER. MIX & PUMP 1000 SX CS III, TAILED IN W/ 600 SX CLASS G. DISPLACE CMT AND BUMP PLUG, NO CMT @ SURFACE. CIP @ 1800 HRS, 7/20/88. PERFORM 350 SX CS II TOP JOB. SET SLIPS. CUT CSG, ND DIVERTER, MADE FINAL CUT. WELD ON FMC CSG HEAD AND TEST SAME. NU BOPE. DAILY:S304,530 CUM:$421,995 ETD:S421,995 EFC:$2,224,000 ) 11) LD FISH 10-3/4"8 3521' MW: 8.8 VIS: 31 FIN NU BOPE & TEST. MU TURBINE BHA. RIH TAG CMT FLOAT COLLAR @ 3440'. TEST CSG TO 2500 PSI; OK. DRILL FLOAT EQUIPMENT & 10' NEW FORMATION. PERFORM LOT TO 14.3 PPG EMW. ATTEMPT TO DRILL, LOST 1000 PSI PRESSURE. POOH, LEFT BEARING SECTION OF TURBINE & BIT IN HOLE. RIH W/ OVERSHOT, WORK OVER FISH @ 3526'. POOH W/O FISH. REDRESS OVERSHOT & RIH. WdRK OVER FISH. POOH & LD FISH. DAILY:S76,190 CUM:$498,185 ETD:S498,185 EFC:$2,224,000 ) 75) DRILLING 10-3/4"@ 3521' MW: 9.0 VIS: 36 LD FISH. PU BHA #3. RIH. DRILL F/ 3540'-4450' DYNADRILL TO 4723'. DROP SURVEY & POOH. SERVICE WEAR BUSHING. ORIENT MWD & RIH. DYNADRILL 4723'- 5215' DAILY:S56,285 CUM:$554,470 ETD:S554,470 EFC:$2,224,000 ) 50) DRILLING 10-3/4"@ 3521' MW: 9.1 VIS: 35 DYNADRILL TO 5513'. DROP SURVEY. POOH & SERVICE WEAR BUSHING. PU B~A #4. RIH. DRILL F/ 5513'-6865' SLIDING AS NEEDED. DAILY:S54,198 CUM:$608,668 ETD:S608,668 EFC:$2,224,000 The above is correct Signature For form preparati(;~ and distribution, see Procedures M49'ual, Section 10, Drilling, Pages 86 ~d 87. JDate Title AGSOCIATE ENGINEER ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District ICountyorParish JState ARCO Alaska, Inc. [ NORTH SLOPE [ AK Field ILease or Unit PRUDHOE BAY UNIT I DS 15-25 Date and depti3 as of 8:00 a.m. 07/25/88 ( TD: 7870' ( 1 SUPV:JCP 07/26/88 ( TD: 8710'( SUPV:JCP 07/27/88 ( TD: 8945'( SUPV:JCP 07/28/88 ( 1 TD: 8945'( SUPV:MDD 07/29/88 ( 1] TD: 9317'( 2 SUPV:MDD 07/30/88 ( 12 TD: 9740'( 4 SUPV:MDD 07/31/88 ( 13 TD: 9760'( SUPV:MDD Complete record for each day while drilling or workover in progress 7) ~05) 3) 340) )) .)35) )) o) ) 72) ) 23) ) 2O) Iwell no. NABORS 28E DRILLING 10-3/4"8 3521' MW: 9.5 VIS: 39 DRILL TO 6897'. DROP SURVEY. POOH. PU BHA #5. REPAIR IRON ROUGHNECK. RIH. WASH THRU TIGHT SPOT F/ 5954'-6030' FIN RIH. DRILL F/6897'-7870' DAILY:S53,185 CUM:$661,853 ETD:S661,853 EFC:$2,224,000 DRILLING 10-3/4"8 3521' MW: 9.8 VIS: 46 DRILLED TO 8321. TRIPPED FOR BIT # 9. DRILLED TO 8710'. DAILY:S52,680 CUM:$714,533 ETD:S714,533 EFC:$2,224,000 RUNNING 7-5/8" CASING 7-5/8"8 8935' MW: 9.7 VIS: 38 DRILL TO 8945'. CIRC. SHORT TRIP 20 STDS, HOLE TIGHT 8 8287' CIRC. DROP SURVEY. SHORT TRIP 8 STDS, NO PROBLEMS. POOH & LD DRILL PIPE & BHA. CHANGE TOP RAMS TO 7-5/8" AND TEST. RU & RUN 7-5/8", 29.7#, L-80, NSCC CSG. DAILY:S50,408 CUM:$764,941 ETD:S7,649,410 EFC:$-4,660,469 PU 3-1/2" DP 7-5/8"8 8935' MW: 9.7 VIS: 38 FIN RUNNING 7-5/8", 29.7#, L-80, BTC/NSCC CSG TO 8935' CIRC & COND HOLE. RU BJ PUMP 130 SX CLASS G, W/ 8% GEL, 10% SAND, 0.25% CD-31 & 2GHS FP-6L @ 11.0 PPG. PUMP 500 SX CLASS G, W/ 1% BA-10, 0.4% FL-32, 0.3% A-2, 0.4% R-l, 0.2% CD-31 & 1 GHS FP-6L 8 15.8 PPG. RECIP PIPE & FULL RETURNS DURING JOB. BUMP PLUG W/ 3000 PSI. PU B~ SET SLIPS, CUT CSG, NU TBG HEAD & TEST. CHANGE KELLY. PU & RIH W/ 4-3/4" BHA AND 3-1/2" DP. DAILY:S273,633 CUM:$1,038,574 ETD:S1,038,574 EFC:$2,224,000 TIH 7-5/8"@ 8935' MW: 9.7 VIS: 38 FIN TIH. DRILLED FLOAT EQUIP + 10' NEW HOLE. PERFORM LOT TEST TO 12.5 PPG EMW. DRILLED TO 9317' POOH. TIH W/ NEW BIT. DAILY:S44,599 CUM:$1,083,173 ETD:S1,083,173 EFC:$2,224,000 SHORT TRIP 7-5/8"8 8935' MW: 8.9 VIS: 37 FIN RIH W/ BIT #11. REAM 120' TO BTM. DRILLED F/ 9317' TO 9740'. CIRC. POOH FOR SHORT TRIP. DAILY:S60,718 CUM:$1,143,891 ETD:S1,143,891 EFC:$2,224,000 RIH W/ 5-1/2" LINER 5-1/2"@ 9758' MW: 8.9 VIS: 38 CIRC BOTTOMS UP. POOH F/ LOGS. RU SCHLUMBERGER, RUN #1 DIL/CNL/BHCS/GR/SP LOG F/ 9740' - 8935'. RUN #2 FMS LOG F/ 9740' - 8935'. RD E-LINE. RIH W/ BIT. DRILL 20' TO 9760'. CIRC & COND. POOH. RU TO RUN 5-1/2" LINER. DAILY:S43,331 CUM:$1,187,222 ETD:S1,187,222 EFC:$2,224,000 The above is correct For form preparation,~nd distribution see Procedures Man/3~l Section 10, Drilling, Pages 86 af~ 87 · IDate ITM ASSOCIATE ENGINEER ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnlerim" sheets until final completion. Report official or representative test on "Final" form. 1} Submit "lnterin~" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District Field ARCO Alaska, Inc. JCounty or Parish JState NORTH SLOPE J AK Lease or Unit DS 15-25 PRUDHOE BAY UNIT no. Date and depth as of 8:00 a.m. o8/ol/88 TD: 9760 PB: SUPV:MDD 08/02/88 ( 1! TD: 9760 PB: 9716 SUPV:MDD Complete record for each day while drilling or workover in progress NABORS 28E RIH W/ 4-3/4" BIT 5-1/2"@ 9758' MW: 8.8 WBM RIH W/ 5-1/2", 17#, L-80, FL4S LINER TO 9758'. CIRC 2 BOTTOMS UP. RU BJ. PUMP 50 BBLS MCS-4 SPACER. BATCH MIX & PUMP 200 SX CLASS G. FULL RETURNS AND BUMP PLUG. PRESSURE UP TO 3500 PSI TO SET LINER HANGER W/ SHOE AT 9758'. POOH W/ RUNNING TOOL. RIH W/ 6-3/4" BIT. WOC. RIH TO TOL, NO CMT. CIRC BOTTOMS UP. POOH. DAILY:S213,771 CUM:$1,400,993 ETD:S0 EFC:$3,624,993 5-1/2"@ 9758' MW: 9.0 NACL FIN RIH. DRILL HARD CMT F/ 8820'-9030' (TOL @ 8597')° WASH TO 9589'. DRILL HARD CMT F/ 9589' TO LANDING COLLAR @ 9637'. TEST CSG TO 3000 PSI. DRILL OUT LANDING COLLAR TO FLOAT COLLAR @ 9716'. DISPLACE HOLE TO 9.0 PPG BRINE. TEST CSG TO 3000 PSI FOR 30 MIN. POOH & LD DRILL PIPE. DAILY:S56,677 CUM:$1,457,670 ETD:S1,457,670 EFC:$2,224,000 The above is correct For form proparation and (~l~tri ' see Procedures Manual Sale, ion 10, Drilling, Pages 86 and 87 ASSOCIATE ENGINEER ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Reporl" form may be used for reporting the entire operation if space is available. Accounting cost center code District I'County or Parish ARCO Alaska, Inc. I NORTH SLOPE Field Lease or Unit PRUDHOE BAY UNIT ADL: 28306 Auth. or W,O. no. Title AS2009 DRTT,L State I Well no. DS 15-2~ API: 50-029-21842 Operator ARCO A.R.Co. W.I. 22.0000 Spudded or W.O. begun Date SPUD 07/18/88 Date and depth as of 8:00 a.m. 08/03/88 ( i Complete record for each day reported NkBORS 28;.. RIG RELEASED I otal number of wells (active or inactive) on this ost center prior to plugging and I bandonment of this well our I Prior status if a W,O, 1530 HRS 5-1/2"@ 9758' MW: 9.0 NACL TD: 9760 PB: 9716 SUPV:MDD PULL WEAR BUSHING. LD 3-1/2" KELLY & PU 5" KELLY. ND BOPE. INSTALL 5" DUMMY HANGER, BPV, NU TUBING HEAD ADAPTER & LOWER MASTER VALVE. FREEZE PROTECT 7-5/8" ANNULUS W/ 100 BBLS DIESEL / CRUDE. BLOW DOWN INJECTION LINES. RELEASED RIG @ 1430 HRS, 08/02/88. DAILY:S15,024 CUM:$1,472,694 ETD:S1,472,694 EFC:$2,224,000 Old TD New TD Released rig Date Classifications (oil, gas, etc.) Producing method PB Depth K nd of r g Type completion (sir~gle, dual, etc.) Off cia reservoir name(s) Potential test data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test !Gas per day · Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct Signature For form preparat/o~ and distribution, see Procedures IVtehual, Section 10, Drilling, Pages 86 and 87. ~ o JTitle IDate ASSOCIATE ENGINEI;R MEMORANDUM State of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION ~ TO: Lonnie C. Smith ,~-/cz/~:!> DATE: July 29, 1988 Commissioner · / mLENO: D.BDF.003 TELEPHONE NO: THRU: SUBJECT.' FROM: Michael T. Minder Sr. Petroleum Engineer Bobby D. Foster ~z.-~,~, Petroleum Inspector BOP Test AAI PBU DS 15-25 Permit No. 88-80 Prudhoe Oil Pool Thursday, July 21, 1988: The test began at 8:30 a.m. and was con- eluded at 10:15 a.m. ~ As the attached BOP Test Report shows there were no failures. In summary, I witnessed the BOP Test on ARCO's DS 15-25. Attachment .. 02-001A(Re~.8!85) _ ' . o&o #4 5/s4 Inspector /~©~C~/ Operator./. ,7-~.~-.~? STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report · Date Representative ~[ '"/ ' .',' Location: Sec ~. TIt~/R i~-~ M U Drillin8 'Contractor /~/~ ~D/~ Location' General ~ Well Sign '~' ACCUMULATOR SYSTEM General Housekeeping j Rig Reserve Pit Mud Systems Visual Audio Trip Tank Pit Gauge Flow Monitor Gas Detectors , BOPE Stack Test Pressure Annular Preventer Pipe R~ms ~, ~O Blind Rams ~00~ Choke Line Valves / H.C.R. Valve / Kill Line Valves ~ Check Valve ~ Full Charge Pressure ~L~ psig Pressure After Closure /~/~ psig Pump incr. clos. pres. 200 psig -- Full Charge Pressure Attained: / N~ '~'~.~: ~', . ,. psi~ Controls: Master RemOte ~7/~ ~ Blinds switch cover~,~ . Kelly and FloOr Safety Valves Upper KellM / Test Pressure Lower Kelly ) Test Pressure Ball Type / Test Pressure Inside BOP / Test Pressure Choke Manifold ~J Test Pressure No. Valves / ~/ Test Results: Failures Repair or Replacement of failed equipment to be made within Commission office notified. min~ 0 sec. min~.,.~._~ s e c. No. flanges Adjustable Chokes Hydrauically operated choke Test Time /, day~ and Inspector/ Remarks: Distribution orig. - AO&GCC cc - Operator cc - Supervisor July 13, 1988 T P Oostermeyer Regional Drilling Engineer ARCO Alaska, Inc P 0 Box 100360 Anchorage, ~ 99510-0360 Telecopy No. (907) 276-7542 Prudhoe Bay Unit DS 15-25 ARCO Alaska, Inc Permit # 88-80 Surf Loc 1820'FNL, 1415'FWL, Sec. 22, TllN, R14E, UM Btmhole Loc 1602'FNL, 1236'FEL, Sec. 22, TllN, R14E, UM Dear Mr OoStermeyer: Enclosed is the apprOved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other govern- mental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours priqr to commencing installation o£ the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. W~ere a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling bel°w the shoe of the conductor pipe. Ve~r~.y truly yours, C V cha-t.~erton Chai~an Alaska Oil and Gas Conservation C~ission BY ORDER OF THE COMMISSION jo Enclosure C~ Department of Fish & Game, Habitat Section - w/o encl Department of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA ,,,,IL AND GAS CONSERVATION C,~,,4MISSION PERMIT TO DRILL 20 AAC 25.005 I la. Type of work Drill [] Redrill E3I lb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil Re-Entry [] DeepenE~I Service [] Developement Gas [] Single Zone ~J Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 62', PAD 30'GL feet Prudhoe Bay Field 3. Address 6. Property Designation Prudhoe Bay 0il Pool P.O. Box 100360 Anchorage, AK 99510-0360 ADL 28306 ALK 2316 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20AAC 25.025) 1820'FNL,1415'FWL,Sec.22,T11N,R14E,UM Prudhoe Bay Unit Statewide At top of productive interval (¢ target) 8. Well nu.mber Number 1 609 ' FNL, 1320 ' FEL,Sec. 22 ,T11 N, R1 4E ,UM DS1 5- 25 #8088-26-27 At total ~le~h6 9. Approximate spud date Amount 1 602 ' FNL ' FEL,Sec. 22,T11N,R14E,UM 07/1 5/88 $500,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth(MD and TVD property line DS 15-9 53' 8933'TVD 1236' @ TD feet 2600' MD/TVD feet 2650 9730'MD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 2o AAC 25.035 (e)(2)) Kickoff depth4500, feet Maximum hole angle 35 0 Maximum surface 291 8 psig At total depth (TVD) 3 800 psig 18. Casing program Setting Depth size Specifications Top Bottom Ouantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 30' 30' 110' 110' 2000 # Poleset 13-1/2"~ 10-3/4" 45.5# J-55 BTC 20' 30' 30' 50' 50' 1000 sx CS Ill 1:3-1/2" 10-:3/4" 45.5# L-80 VAM 3450' 50' 50' 3500' 3.500' 600 sx Class 'G' 9-7/8" 7-5/8'"I 29.7# L-8¢ NSCC 8944' 29' 29' 8973' 8317' 500 sx Class 'G' 6-3/4" 5-1/2'1 17# L-8£ FL4S /O~'"~¢ 8673' 8059' 9730' 8933' 200 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor REcEiVED Surface Intermediate ~ (J b ~ '~ Production Liner AIsska 0ii & Gas Cons. Commission Perforation depth: measured , Anchorage true vertical 20. Attachments Filing fee ~ Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program ~ Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements 21. I hereby certify that the foregoing is true and' correct to the best of my knowledge Signed J .- Title ~,~,~,-,,,~l nr~,,~ ~.qg~ Date , Commission use~Or~ly ......... ~ ~ ~j<~'~'~ Permit Number I Ap, number I Approva, date I See cover letter ~8~o 50-o'29 - P~t~z/~ 07/13/88 for other requirements Conditions of approval Samples required [] Yes j~' No Mud Icg required E3 Yes [~ No Hydrogen sulfide measures [] Yes ~'No Directional,survey required ~Yes [] No Required working prec. s,ure for.l~OPE~; ~ 3M;~ ~' 5M; [] 10M; [] 15M by order of Approved by the commission Date Form 10-401 Rev. 12-1-85 (GSW) PD3/008 Sub~ triplicate NOTE- a) In accordance with Area Injection Order No. 4, excess non-hazardous fluids developed from well operations and as necessary to control fluid level in reserve pit will be disposed of down the 10-3/4" x 7-5/8" annulus. The annulus will be left with a non-freezing fluid during any extended interruption in the disposal process. The annulus will be sealed with 300 sx of cement followed by Arctic pack upon the completion of the fluid disposal process. b) Wells within 200' of the proposed well are' DS 15-9 53' @ 2600'MD/TVD DS 15-10 58' @ 600'MD/TVD DS 15-8 168' @ 3648'MD/TVD DS 15-11 180' @ Surface c) The drilling fluid program and fluid surface system will conform to the regulations set forth in 20AAC25.033. d) Maximum surface pressure is based upon BHP and a full column gas to TD (0.10 psi/ft). e) Based upon previous logs on DS 15, no potential production zones are antici- pated above 4000'TVD. 6/28/88 PD3/008.2 1) 2) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) 15) 16) 17) 18) 19) PBU DS .15-25 PROPOSED DRILLING PROGRAM MIRU, NU 20" diverter and function test same, Drill 13-1/2" hole to 3500'MD/TVD, Set and cement 10-3/4" casing to surface with 1000 sx CS III and 600 sx Class G, NU and test 13-5/8" 5000 WP RSRRA preventer, TIH w/9-7/8" assembly, Test casing to 2000 psi, Drill out float equipment and 10' of new hole, Perform formation test to leak off, Drill 9-7/8" hole to 4500' MD/TVD, Kick off well and build angle to 35° 29' at N85° 16'E, Drill 9-7/8" hole to IO'TVD above the.top of Sadlero_chit at 8973 ' MD/8317 ' T-VD, ' ~-'--. ~.~..-. Set and cement 7-5/8" casing with 500 sx Class G, Test casing to 3000 psi and drill out, Perform leak off test, Drill 6-3/4" hole to TD at 9730'MD/8933'TVD, Run open hole logs, Set and Cement 5-1/2" liner with 200 sx Class G, Clean out cement and test casing and liner to 3000 psi, Displace mud with completion brine and release rig, Run cased hole logs, Complete well with 3-1/2" tubing, Perforate and stimulate as necessary, 6/28/88 PD3/008,3 . 08 15-25 ---, 8000 'TD / .~ ~4 10000 0 1000 2000 3000 4000 5000 8000 ?000 1000 -~~ 1000 ALA,SKA, INC. 2000 .'~CALI:: I IN, = 11}11t~ FT_ 2000 SI'IL: 1820' ~NL, 1416' FVIL, SE~ 22, '11N, R14E, UI~ THL: 1609' FNL, 1320' FILL, 3000 ~E~ ~_ "11N~ R14E_ lJ ~ 3000 r0-3/4' CASIN 3 TVO -- 3500 ~000 ~00 ~OP TVD = 45~)0 ~.5 5000 ~ 7.5 1~.5 N BE DI[G 16 MINE 5000 17.5 ass4 F' '(TO TAReET) EOC TV[ =5831 MD =5920 OEP= 6000 .... ,.,L -- -,. IdoG 6000 Ai~sk~ K"10 TVD=I812 MD=712t DEP=1128 7000 7000 K-5 TVD=7392 MD =7837 DEP=1539 .CU TVD = ~n~ ~n = 9~13 [~EP -- !988 8000 SAG RIVER TVD -- 8227 MD - 8883 DEP -,2134 7-6/8' CASING TVD -- e31; MD - ce73 DEP - 2189 TOP SADLEIlOCHIT TVD = 8327 MD = 8~ Be DEP -- 220~- G/O CO NTACT TVD - ~777 MD - 96~[8 DEP - 2627 - ~ ' TARa! T TVD - eels MD - 0888 OEP - 26~4 :~ MD m 9730 D,EP m 2037 ' -- - - ,-" ~ P~ LISB JRNE TVD - gl)27 MD -- g84~ DEP - 2706 0 1000 2000 3000 4000 5000 6000 7000 VERTICRL SECTION 0'0T BgdSSIO 00SSI ' NBooBg-BOP 886T ~NflF o -2000 E - N COOROINR'rES - 1000 0 1000 2000 3000 4000 5000 0 0 0 0 0 0 0 0 w (J') ED z 0 0 o I ! ii ! i ! i i i i ! i 5-25 ---~1 5 REC ,.,; ;... .:,..,. ALa, sK~ Oil & Ga Cons, Am hoi'a§e i i i ! i i i i i i I -2000 -1000 0 1000 ZOO0 3000 4000 5000 E - IN COORDINFt~ES CD -2000 CD CD CD O CD o CD w OF) CD CD CD CD E - 14 COOROINATEW z -1000 0 1000 2000 3000 4000 5OOO CD 723 __~-~ 1,5-25 -~- IU ~s Cons. i i i i -2000 -1000 0 1000 2000 3000 4000 5000 E - 14 COORDINATES E - N O00ROINBT£S 0 ~00 Z -300 -P. O0 - 1 O0 200 300 400 C ~ I I I I t I II I t I I I I I I t I I I I I I I I II I I I I I I I I I I I I I I I I I I I ! I I I I I I I ! ! I II 63Zl ~~ 792 71~ /5993 ~~633 0 - DS , 05i5-i t -300 -200 - 1 O0 0 100 200 300 400 [ - N OOOROIN~T[S Depth (TVD) DS 15-25 MUD PROGRAM Plas Yield Density Visc. Point Initial 1OM ~/gal (CP) #/100 ft2 Gel Gel FL % % CC/30M Oil Solids Surf 8.8 Funnel to to 100- 10-3/4" 9.2 250 Csg Point 40-60 30+ 50+ 25 0 8 10-3/4" 8.8 Minimum 2 2 5 25 Csg Shoe to Possible to to to to to 9.4 4 4 10 10 K-lO 3.5 to 6.5 pH and Type of Mud Gel-Benex Spud Mud Low solids/ non-dispersed K-lO 9.2 10 6 4 8 8 to TD to to to to to to 7-5/8" 9.8 20 10 8 12 4 Csg Point 2 to 5 4 to 8 pH 8.0-9.0 Low solids/ non-di spersed 7-5/8" 8.8 10 6 4 8 10 Csg Shoe to to to to to to to TD 9.2 20 10 8 12 4 2 to 5 4 to 8 Low solids/ non-dispersed EQUIPMENT - DRILLING FLUID SYSTEM 1. Degasser 2. Shakers 3. Pit level indicator (with both visual and audio warning devices) 4. Drilling fluid flow sensor (with readout convenient to the driller's console) 5. Trip tank 6. Agitators 7. Mud cleaner and centrifuges 6/28/88 PD3/008.4 MUD SYSTEM NABORS 28E MUD CLEANER MUD CLEANER SAND TRAP , 4 BBLS ' TRIP TANK PIT I 171 BBLS 130 BBLS PIT 2 PIT 3 81 BBLS 137 BBLS PIT 5 117 BBLS PIT 4 179 BBLS PILL PIT 20 BBLS PIT 6 Alaska Oil & Gas Cons. Commission Anchorage, CAVIEM SB-7 MUD CLEANERS (2 @ 750 GPM EACH) DESANDER 3 X 12" DIAMETER CONES DRILCO DEGASSER BRANDT CENTRIFUGE MUD PUMPS: 2 CONTINENTAL EMSCO FB-1600 DACRO GAS BUSTER JG 8/6/87 NABORS 28E DIVERTER SYSTEM ARCO ALASKA, INC. SCHEMATIC FILL-UP LINE I I 20" ~ 2000 PSI DIVERTER RISER IFLOWLINE 10" BALL VALVE I CONDUCTOR 10" BALL VALVE NOTE' ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND VENT LINE. THE SECOND VENT LINE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS A VARIANCE FROM 20AAC25.035 RESERVE PIT 10" VENT LINE WELL 10" VENT LINE DIVERTER LINES DISCHARGE 100' FROM RIG IGNITION SOURCE. ALL TURNS ARE 90° TARGET TEES. JG 8/6/87 13-5/8" b, O0 PSI BOP STACK' i'IAGRAI"I ACCUMULATOR CAPACITY TEST I I REVENTER~ ¢1 I~° PI PE RAHS I BLI ND RAHS I ~-~ DRI LLI NO i~ SPOOL ¢1 , PI PE RAHS ',. / ~ ~o-3z4- STARTING HEAl) ALL BOP EQUIPMENT 5000 PSI RATED 18. 1. CHECK AND FILL ACCUMULATOR RESERYOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS $000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. :~. OBSERVE TI ME, THEN CLOSE ALL UNITS SI MULTANEOUSLY AND RECORD THE TI ME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TI ME AND 1200 PSI REI"IAI NING PRESSURE. 13-5/8" BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH A NON-FREEZING LIQUID. Z. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED. MARK RUNNING JOINT WITH PREDETERMINED PLUG SEATING DEPTH. RUN TEST PLUG ON DRILL PIPE AND SEAT IN WELLHEAD. R U N I N LOC K DOW N SC R EWS. $. CLOSE ANNULAR PREVENTER AND UPSTREAM VALVES. 4. FUNCTIONALLY TEST CHOKES. 5. IN EACH OF THE FOLLOWING TESTS, FIRST HOLD A 250 PSI LOW PRESSURE TEST FOR A MINIMUM OF $ MINUTES, THEN TEST AT THE HIGH PRESSURE. 6. INCREASE PRESSURE TO $000 PSI AND HOLD FOR A MINIMUM OF :~ MINUTES. BLEED PRESSURE TO ZERO. 7. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR AT LEAST $1"11MUTES. BLEED PRESSURE TO ZERO. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES AND OPEN CHOKES. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR AT LEAST $ MINUTES. BLEED PRESSURE TO ZERO. 9. OPEN TOP SET OF PIPE RAMS THEN CLOSE BOTTOM SET OF PIPE RAMS. INCREASE PRESSURE TO 5000 PSI BELOW THE BOTTOM SET OF PIPE RAMS AND HOLD FOR AT LEAST $ MINUTES. 10. TEST REMAINING UNTESTED MANIFOLD VALVES (IF ANY) WITH 5000 PSI UPSTREAM OF VALVE AND ZERO PRESSURE DOWN- STREAM. 11. BLEED PRESSURE TO ZERO. OPEN BOTTOM SET OF PIPE RAMS. 1Z. BACK OFF RUNNING JOINT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR AT LEAST $ MINUTES. 15. BLEED PRESSURE OFF ALL EQUIPMENT. OPEN BLIND RAMS. MAKE SURE MANIFOLD AND LINES ARE FULL OF NON-FREEZING LIQUID AND ALL VALVES ARE SET IN DRILLING POSITION. 14. TEST STANDPIPE VALVES TO 5000 PSI. 15. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI. 16. CHECK OPERATION OF DEGASSER. 17. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNC- TIONALLY OPERA~.E,.B~F,, D,~I~ ,.- ~%L~.~ ~ ~[? GSW6/28/88 ARCO Alaska, Inc. Post Office Box 100360 Anchorage. Alaska 99510-0360 Telephone 907 276 1215 May 17, 1988 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Conductor As-Built Location Plat - DS 15 ( We 11 s 24 l?~!~ Dear Mr. Chatterton' Enclosed is an as-built location plat for the subject wells. any questions, please call me at 263-4944. Sincerely, J. Gruber Associate Engineer JG'pk GRU13/11 Enclosure If you have ARCO Alaska, Inc. is a Subsidiary of AtlanticRict3tieldCompany I I t / /. / /$ ~t$ o00 '00" _ o · CONO~A*,PO/9 2t VICINITY MAP #o SC,aLE 15.25 Y:~3,~$9,695.35 LARzTOeI?"43.402'' /~,~I'~.A/.L., /414'~'.W./.. .PAO ECEV. 29.9' NOTES~ I I. ~4315 Olr LOCAI'ION 13 0..~ 13 CONOUCTOI~ 1-13 ~. ALL CO0~OINA?~ SNOWN 4~E &.S.~ ZONE .~, ~A.O~ 2? OA c- I HEIR~BY CERTIFY THAT I AM PROPERLY REGISTERED AND LICE~D TO PRACT~ LAND ~II~G IN THE ~rATE OF ~ AND THAT THI~ FR_&T R~rlRII~NI'~ AN AS-~UILT SURVEY MAI:~ BY ME, ANO THAT ALL DIMENIKN~ AND OTHER DETAII~ ILAP~ comqec'r,,, ~ oe: ;~ Aw., / i~1 ARCO Aleoka, Inc. O~ILL SITE 15 CONOUCTOIfS 24 & 25 AS-~UIL~' LOCATION CHECK LIST FOR NEW WELL PERMITS ITEM APPR, OVE DATE (2 thru 8) (8) (3) ,Admin ~ ~,~)~/Sa 9. (9 t,hru 10. '. 11. (10 and 13) 12. 13. (4) Casg ~.~, Y-/,?-~'5¢ (14 thru 22) (5) BOPE '//-'/i'_~ (23 thru 28) (6) OTHER ~ l/6/~ (29 thru 31) (6) Add: Company /0 }2Ck~ Lease & Well No. YES NO Is the permit fee attached .......................................... ~ 2. Is well to be located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ...................... Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is'administrative approval needed ................................... Is the lease number appropriate ..................................... Does the well have a unique name and number ......................... 14. 15. 16. 17. 18. 19. 20. 21. 22. Is conductor string provided ........................................ Will surface casing protect fresh water zones ....................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ 23. 24. 25. 26. 27. 28. Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate/~ Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating ~ Test to ~doO psig .. Does the choke manifold comply w/API RP-53 (May ~84) .................. Is the presence of H2S gas probable ................................. REMARKS For exploratory and Stratigraphic wells: 29. Are data presented on potential overpressure zones? ................. // 30. Are seismic analysis data presented on shallow gas zones .... ~e.~;..~/d~i 31 If an offshore loc., are survey results of seabed conditions ~se ed 32. Additional requirements ..................................... ..~...... /f4q o tqm Geology: Eng%~keering: ~ zcs EWr" rev: 02/17/88 6.011 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE ·, 6~o/~--o P ~'U - I OIL , 'i5:'90 l/O'-c> Well History File APPENDIX Information of detailed nature that is not padiculady germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX.' No special'effort has been made to chronologically organize this category of information. ALASKA COMPUTING CENTER SCHLUMBERGER COMPANY NAME : ARCO ALASKA, INC. WELL NAME : D.S. 15 - 25 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA AP1 NUMBER : 50-029-21842-00 REFERENCE NO : 95261 LIS Tape'Verii~icat;ion Lis~,ing Sch I umberger A I aska Compu~,i ng Cent, er 7-AUG-1995 16:10 **** REEL HEADER SERVICE NAME : EDIT DATE : 95/08/ 7 ORIGIN : FLIC REEL NAUE : 95261 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA INC, DS 15-25, PRUDHOE BaY, 59-029-21842-00 **** TAPE HEADER SERVICE NAME : EDIT DATE : 95/98/ 7 ORIGIN : FLIC TAPE NAME : 95261 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA INC, DS 15-25, PRUDHOE BAY, 59-929-21842-99 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D.S. 15 - 25 AP1 NUMBER: 59~292184299 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 7-AUG-95 JOB NUMBER: 95261 LOGGING ENGINEER: SIMMONS OPERATOR WITNESS: JENNIFER JUL SURFACE LOCATION SECTION: 22 TOWNSHIP: 11N RANGE: 14E FNL: 182! FSL: FEL: FWL: 1414 ELEVATION(FT FROM MSL 9) KELLY BUSHING: 62.99 DERRICK FLOOR: 61.90 GROUND LEVEL: 39.99 # WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 10.750 3521.0 2ND STRING 7.625 8935.0 3RD STRING 5.5e0 9758.0 PRODUCTION STRING 3.500 8718.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) 45.50 29.70 17.00 9.20 PAGE: LI~ Tape Verification Listing Schlumberger Alaska Comput|ng Center 7-AUG-1995 16:10 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 3~-JUL-88 LOGGING COMPANY: SCHLUMBERGER WELL SERVICES BASELINE DEPTH GRCH ,EQUIVALENT UNSHIFTED DEPTH, TDTP 88888.0 88888.5 88888.0 9554.~ 95S4.0 9553.5 9554.0 9542.0 9542.5 9523.5 9523.0 9522.5 9522.5 9491.5 9491.5 9462.0 9462.5 9446.5 9446.5 9414.0 9414.0 9410.0 9411.0 9396.5 9396.5 939~.0 9391.0 9372.5 9372.5 9372.5 9353.0 9352.5 9331.5 9331.5 9327.5 9327.5 9294.5 9295.5 9293.5 9295.0 9269.5 9271.5 9268.5 9271.0 9173.e 9174.0 9149.5 9151.5 9134.5 9136.0 9134.0 9136.0 9125.5 9127.0 9101.5 9104.5 9093.0 9095.0 9079.0 9081.5 9035.0 9037.0 9034,5 9037,5 9e26.0 9029.0 8998.5 9000.5 8993.0 8996.0 8968.0 8970.5 8964.0 8966.0 8951.0 8953.0 8950.0 8953.0 8937.5 8939.5 8927.0 8928.5 100.0 101,5 103.0 $ REMARKS: The depth adjustments shown above reflect cased hole GR to open hole GR and cased hole SIGM to open hole GR. PAGE: LI~ Tape Verification Listing 7-AUG-1995 16:10 Schlumberger Alaska Computing Center All other TDTP curves were carried with the SIGM shifts. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .eel SERVICE : FLIC VERSION : OO1CO1 DATE : 95/08/ 7 MAX REC SIZE : :[024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: DEPTH INCREMENT: 0.500~ FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ REMARKS: This file contains TDTP Pass #[. No pass to pass shifts were applied to this data. $ LIS FORMAT DATA DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 LI~ Tape Verification List|ng Schlumberger Alaska Computing Center 7-AUG-1995 16:10 PAGE: TYPE REPR CODE VALUE 3 73 96 4 66 [ 5 66 6 73 7 65 8 68 0.5 9 65 FT ~1 66 ~0 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT SIGM TDTP TPHI TDTP SBHF TDTP SBHN TDTP SIGC TDTP SIBH TDTP TRAT TDTP LCO1 TDTP SDSI TDTP FT 506223 00 e00 00 CU 5e6223 00 e00 00 PU-S 506223 00 00~ eO CU 506223 00 ~00 ~0 CU 506223 0~ 000 00 CU 506223 00 000 00 CU 506223 00 e00 00 5e6223 00 e00 eO 506223 00 eeo 00 cu 506223 00 zee 00 BACK TDTP CPS 506223 FBAC TDTP CPS 506223 TCAN TDTP CPS 506223 TCAF TDTP CPS 506223 TCND TDTP CPS 506223 TCFD TDTP CPS 506223 TSCN TDTP CPS 506223 TSCF TDTP CPS 506223 INND TDTP CPS 506223 INFD TDTP CPS 506223 GRCH TDTP GAPI 506223 TENS TDTP CCL TDTP GR BCS V 506223 00 000 0~ GAPI 506223 00 000 00 0 I 1 1 4 68 0000000000 0 1 1 1 4 68 0000~0e000 0 1 1 1 4 68 0000e00000 0 I 1 1 4 68 0000~00000 0 1 1 1 4 68 0000000000 0 1 1 1 4 68 000000~000 0 1 1 1 4 68 00000eee00 0 1 1 1 4 68 0000~00000 0 I 1 1 4 68 000000e000 0 1 1 1 4 68 0000e00000 0 1 1 1 4 68 00e0000000 0 1 1 1 4 68 OeooOooe00 0 1 I I 4 68 0000000000 0 1 1 1 4 68 000e000000 0 1 1 1 4 68 000000e000 0 1 I 1 4 68 0000000000 0 1 1 1 4 68 0000000000 0 1 I 1 4 68 000000~00 0 1 1 1 4 68 0000000000 0 1 1 1 4 68 0000000000 0 I 1 1 4 68 0000000000 0 1 1 1 4 68 0000000000 0 I 1 1 4 68 0000000000 0 1 1 1 4 68 0000000000 DATA LI~ Tape'Verification List;lng Schlumberger Alaska Compu%ing Cen~er 7-AUG-1995 16:10 DEPT. 9688.000 SIGM.TDTP -999.250 TPHI.TDTP -999.250 SBHN.TDTP -999.25e SIGC.TDTP -999.25e SIBH.TDTP -999.250 LCO1.TDTP -999.250 SDSI,TDTP -999.250 BACK.TDTP -999.259 TCAN.TDTP -999.259 TCAF.TDTP -999.250 TCND.TDTP -999.259 TSCN.TDTP -999.259 TSCF.TDTP -999.259 INND.TDTP -999.259 GRCH.TDTP -999.259 TENS.TDTP -999.259 CCL.TDTP -999.259 DEPT. 8896.599 SIGM.TDTP -999.259 TPHI.TDTP -999.259 SBHN.TDTP -999.259 SIGC.TDTP -999.259 SIBH.TDTP -999.259 LC91.TDTP -999.259 SDSI.TDTP -999.259 BACK.TDTP -999.259 TCAN.TDTP -999.259 TCAF.TDTP -999.259 TCND.TDTP -999.259 TSCN.TDTP -999.259 TSCF.TDTP -999.259 INND.TDTP -999.259 GRCH.TDTP 49.438 TENS.TDTP -999.259 CCL.TDTP -999.259 SBHF.'I'DTP TRAT.TDTP FBAC.TDTP TCFD.TDTP INFD.TDTP GR.BCS SBHF.TDTP TRAT.TDTP FBAC.TDTP TCFD.TDTP INFD.TDTP GR.BCS PAGE: -999.259 -999.250 -999.259 -999.259 -999.259 121.438 -999.259 -999.259 -999.259 -999.259 -999.250 -999.259 END OF DATA **** FILE TRAILER **** FILE NAME : EDIT .991 SERVICE : FLIC VERSION : 99ic9i DATE : 95/98/ 7 MAX REC SIZE : 1924 FILE TYPE : LO LAST FILE : **** FILE HEADER FILE NAME : EDIT .992 SERVICE : FLIC VERSION : 991C91 DATE : 95/98/ 7 MAX REC SIZE : 1924 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: EDITED CURVES Depth shif%ed and PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY LDWG TOOL CODE GRCH SIG~ $ 2 c I i pped 2 9. 5909 curves for START DEPTH 9559.9 9584.0 each pass STOP DEPTH 8896.9 8896.0 in separa%e files. LIS Tape'Verification Listing Schlumberger AI asea Computing Center 7-AUG-1995 CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOE SHIFTS LDWG CURVE CODE: GR PASS NUMBER: 1 EQUIVALENT UNSHIFTED BASELINE DEPTH GRCH SIGM 88888.0 88888.0 88888.0 9575.5 9575.5 9571.5 9572.0 9567.5 9567.5 9563.5 9563.0 9559.5 9559.5 9547.5 9547.5 9543.5 9544.0 9539.5 9539.5 9533.5 9533.5 9531.5 9531.5 9529.5 9529.0 9527.5 9527.0 9523.5 9523.0 9519.5 9520.0 9517.5 9517.0 9515.5 9515.5 9513.5 9512.0 9509.5 9509.0 9503.5 9503.5 9499.5 9500.0 9487.5 9488.0 9483.5 9483.5 9481.5 9481.0 9479.5 9480.0 9477.5 9477.5 9475.5 9475.5 9473.5 9473.5 9471.5 9472.0 9465.5 9466.0 9461.5 9461.5 9457.5 9457.5 9453.5 9453.0 9441.5 9441.0 9439.5 9440.0 9437.5 9437.5 9435.5 9436.5 9433.5 9433.0 9431.5 9431.5 9429.5 9429.5 9427.5 9428.0 9423.5 9424.5 9391.5 9392.5 9387.5 9388.0 9379.5 9380.0 9375.5 9375.5 9371.5 9371.5 i6:i0 DEPTH PAGE: LI~ Tape'Veriflca~;ion Lisf, ing Schlumberger Alaska Compuf, ing Cen~er 7-AUG-1995 16:10 PAGE: 9369.5 9367.5 9365.5 9359.5 9355.5 9347.5 9345.5 9343.5 9341.5 9339,5 9323,5 9319.5 9313.5 9311.5 9309.5 9307.5 9305.5 9301,5 9299,5 9295.5 9291.5 9289.5 9287.5 9285.5 9281.5 9277.5 9275.5 9271.5 9267.5 9263.5 9259.5 9257.5 9255.5 9251.5 9247.5 9243.5 9239.5 9235.5 9231.5 9227.5 9223.5 9219.5 9215.5 92~3.5 9199.5 9193.5 9189.5 9187 5 9185 5 9183 S 9181 5 9177 5 9167 5 9163.5 9161.5 9369.5 9365.~ 9345.0 9341.5 9313.5 9310.5 9307.~ 9302.5 9290.5 9286.0 9282.5 9279.5 9259.5 9195.0 9189.5 9187.e 9181.5 9178.5 9162.5 9367.0 9359.e 9355.5 9347.5 9343.0 9339.5 9323.5 9320.0 9312.0 9308.5 9300.5 9297.0 9293.0 9289.5 9277.5 9274.0 9270.0 9265.5 9262.0 9258.0 9253.5 9249.5 9246.0 9241.5 9237.0 9233.5 9230.5 9226.5 9222.0 9217.5 9205.5 9201.0 9189.0 9185.5 9169.5 9165.0 LI~ Tape Verification Listing Schlumberger Alaska Computing Center 7-AUG-1995 16:10 PAGE: 9159.5 9157.5 9149.5 9145.5 9141.5 9139.5 9135;.5 9129.5 9125;.5; 9121.5; 9117.5; 9115;.5; 9111.5; 9107.5; 9103.5 9099 5; 9097 S 9095 S 9~79 S 9~75 S 9~71S 9065 5 9061 905;9.5; 905;5.5 9051.5; 9043°5; 9039.5 9033.5; 9029.5; 9017.5 9013.5 9009.5; 8995. S 8991 8987 5 8983 895;9 S 895;;5; 5 895;1 8947 8943 5 8941 5 8939.5; 8937 8935; .5 8933.5 8929.5 8919,5 8915.5 lo0.0 $ 9159.0 9151.0 9146.5; 9143.0 9131.0 9126.5 9122.0 9119.0 9103.0 9099.5 9067.5 9063.0 9035. 9031. 9019. 9016.0 9011. 8943.5; 8939.0 8935;.0 8930.5 101.0 9161.5 9141.5 9137.0 9117.0 9113.5 9110.0 9106.5 9102.5 9098.0 9082.0 9078.5 9074.0 9062.0 9058.5 905;4.0 9046.0 9042.5; 8998.5; 8994.0 8990.0 8985.5; 8961.5; 895;8.0 8954.0 8950.5 8946.0 8942.0 8938.5 8922.5; 8918.0 102.5 REMARKS: This file contains TDTP Pass #2. The depth shifts LI~ Tape Verification Listing Schlumberger Alaska Comput|ng Center 7-AUG-Z995 16:10 shown above relect GRCH pass $2 to GRCH pass $1 and SIGM pass #2 to SIGM pass #1. $ LIS FORMAT DATA PAGE: ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 2 66 3 73 92 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 00 000 00 0 2 1 I 4 68 eoOeooOe00 SIGM TDTP CU 5e6223 Oe 00e 00 0 2 1 I 4 68 eooooooe00 TPHI TDTP PU-S 506223 00 000 00 0 2 I I 4 68 0000000000 SBHF TDTP CU 506223 00 ~00 00 0 2 1 1 4 68 0~00000~0~ SBHN TDTP CU 506223 00 000 00 0 2 1 1 4 68 0000000000 SIGC TDTP CU 506223 00 000 00 0 2 I I 4 68 000000~000 SIBH TDTP CU 506223 00 000 ~0 0 2 I 1 4 68 0000~00000 TRAT TDTP 506223 00 000 00 0 2 1 I 4 68 000eOoooeo LC01TDTP 506223 00 0e0 00 0 2 1 1 4 68 0000000000 SDSI TDTP CU 506223 00 000 00 0 2 1 1 4 68 0000000000 BACK TDTP CPS 506223 00 000 00 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 5e6223 00 000 00 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 506223 00 000 00 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 506225 00 000 00 0 2 1 1 4 68 0000000000 TCND 'rDTP CPS 506223 00 000 00 0 2 1 1 4 68 000000~000 TCFD TDTP CPS 5e6225 00 000 00 0 2 1 1 4 68 000e000000 TSCN TDTP CPS 506225 00 000 00 0 2 1 1 4 68 0000000000 LI~ Tape Verification Listing Schlumberger Alaska Computing Center 7-AUG-1995 16:10 PAGE: NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TSCF TDTP CPS 5Z6223 ZZ ZZZ ZZ INND TDTP CPS 5Z6223 ZZ ZZZ ZZ INFD TDTP CPS 5Z6223 ZZ ZZZ ZZ GRCH TDTP GAPI 5Z6223 ZZ ZZZ ZZ TENS TDTP LB 506223 ZZ zee zz CCL TDTP V 5Z6223 ZZ ZOZ ZZ 0 2 ! 1 4 68 ZZZZZZZZ00 Z 2 I ! 4 68 zzzzzzzezz DATA DEPT. 9584.ZZZ SBHN.TDTP 33.930 LCZ[.TDTP 2.525 TCAN.TDTP 48411.164 TSCN.TDTP 9639.693 GRCH.TDTP -999.25Z SIGM.TDTP 13.688 TPHI.TDTP 28.896 SBHF.TDTP SIGC.TDTP 2.088 SIBH.TDTP 33.930 TRAT.TDTP SDSI.TDTP Z.343 BACK.TDTP 221.702 FBAC.TDTP TCAF.TDTP 19169.926 TCND.TDTP 29791.953 TCFD.TDTP TSCF,TDTP 3817.140 INND.TDTP 2Z68,148 INFD,TDTP TENS.TDTP 1220.ZZ0 CCL.TDTP Z.ZZZ DEPT. 8897.Z00 SIGM.TDTP SBHN.TDTP -999.250 SIGC.TDTP LCZ[.TDTP -999.25Z SDSI.TDTP TCAN.TDTP -999.25Z TCAF.TDTP TSCN.TDTP -999.25Z TSCF.TDTP GRCH.TDTP 55.5Z0 TENS.TDTP ** END OF DATA ** -999.25Z TPHI.TDTP -999.250 SIBH.TDTP -999.25Z BACK.TDTP -999.250 TCND.TDTP -999.250 INND.TDTP -999,250 CCL,TDTP -999.25Z SBHF.TDTP -999.25Z TEAT.TDTP -999.25Z FBAC.TDTP -999.25Z TCFD.TDTP -999.25Z INFD.TDTP -999.25Z 24,023 1.920 77.327 9253.934 398.828 -999.25Z -999.25Z -999.25Z -999.25Z -999.250 **** FILE TRAILER ***, FILE NAME : EDIT .0Z2 SERVICE : FLIC VERSION : ZOlCZl DATE : 95/Z8/ 7 MAX REC SIZE : lZ24 FILE TYPE : LO LAST FILE : **** FILE HEADER ,,,, FILE NAME : EDIT .ZZ3 SERVICE : FLIC VERSION : 0ZLC01 DATE : 95/08/ 7 MAX REC SIZE : lZ24 FILE TYPE : LO LAST FILE : LIS Tape'Verif|cat|on L|sting Schlumberger Alaska Computing Center 7-AUG-1995 16:10 FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: e.seee FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9559.0 8897.0 S[GM 9584.0 8897.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GR PASS NUMBER: .......... EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GRCH SIGM 88888.0 9575.5 9571.5 9543.5 9539.5 9537.5 9533.5 9531.5 9527.5 9523.5 9521.5 9519.5 9517 5 9513 5 9509 5 9505 5 9501 5 9499 5 9495 5 9491 5 9487 5 9483 5 9479 5 9477 5 9475 5 9469 5 9457 5 9453.5 9433.5 9431.5 9429,5 9427.5 9425,5 88888.0 9537.5 9533.0 9521.0 9516. 95;13. 9508. 95E~4. 9501. 9477,0 9469.5 945;7.5 9453.0 9433.0 9429.5 9425.5 88888.~ 9575.5 95;71.0 9543.e 9539.5 95;31.5 9527.e 9523.0 95;19.5; 9499.5 9496.0 9491.5 9488,0 9483.5 9479.5 9476.0 9432.0 9427.5 PAGE: 11 LI'S Tape Verification L|sting Schlumberger Alaska Computing Center 7-AUG-1995 16:10 PAGE: 12 9423.5; 9421,5 9422.0 9419.55 9417.55 9417.55 94155.5 9413,55 9413,5 9411.55 9409.5; 9409. 9407.5; 94055.55 94055.55 9403.55 9401.5 94EI1.5 9397.55 9397.0 9393.5; 9393.5 9389.55 9389.0 9387.5 93855.5; 93855.0 9383.55 9381.55 9381.5 9379.55 93755.55 9343, 9339.55 93355. 9319.55 93155.55 9313.55 9313.55 9311.55 9309.5 9310.5 931~3. S 9299. S 9291 .S 9289.55 9290. S 9287.55 9285.5 9286.0 9283.55 9281.5 9282.5 9279.5 9277.55 9278.5 9275.55 9273.5 9275.5 9255. S 92551 9247. 9245.5; 9247.55 9241. S 9244.0 9233.5; 9236.0 9223. S 9219.5 923.5 .S 9211.55 92~7.55 9203.5 9199.5 9195.5 9423.0 9420.0 9416.5 9412.0 9408.0 94~4.5 9388.5 9384.0 9380.0 93755.5 9343.5 9339.0 9335.55 9319.55 9316.0 9312.55 9304.55 9301.0 9293.0 9289.5 92855.0 9281.5 9278.0 92558.0 92553.5 92550.0 9226.0 9221 5 9217 5 9214 0 9209 5 9206 0 9202 0 9197.0 LI~; Tape Verifica~,ion Lis~,ing Schlumberger Alaska Compuf, ing Cent, er 7-AUG-Z995 1.6:10 PAGE: 13 9191.5 9189.5 9183.5 9179.5 9175.5 9167.5 9163.5 9159.5 9157 .S 9153.S 9149.S 9145 .S 9143.5 9141 .S 9139.5 9137 .S 9125.5 9121..S 9119.5 9117 .S 911.5.5 9113 .S 9111 .S 9079.5 9077.5 9075.5 9073.5 9e71.5 9061.5 9059 $ 9057 5 9055 5 9051 5 9045 5 9041 5 9039.5 9037.5 9035.5 9033.5 90].! .5 90ii7.5 8995.5 8991.5 8987.5 8983.5 8959.5 8955.5 8951. .5 8949.5 8947.5 8945.5 8943.5 8939.5 8935.5 8933.5 9191.0 9159.0 9154.5 9151.0 9146.5 9143.0 9138.5 9126.5 9122.0 9119.0 9115.5 9079.5 9ii63.ii 9ii59.5 9ii47.5 9ii43. ii 9039 .ii 9035.5 8951..5 8947.0 8935.0 9193.5 9185.5 9182.ii 9177.5 9169.5 9161.5 9145.5 9141.ii 9121.ii 9117.5 911.4.0 9ii42.0 9ii38.5 8998.0 8993.5 8985.5 8961..5 8958.ii 8954.ii 8946.ii 8942.ii 8938.5 LI'S Tape Verifica%ion Lis%lng Schlumberger Alaska Compu%ing Cen%er 7-AUG-1995 16:10 8929.5 895e.5 8919.5 8922.5 8915.5 8919.0 $ REMARKS: This file con%ains TDTP Pass #3. The dep%h shif%s shown above relec% GRCH pass #3 %o GRCH pass #1 and SIGM pass #3 %o SIGM pass #1. LIS FORMAT DATA PAGE: [4 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 92 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 ~2 68 ~3 66 0 14 65 FT 15 66 68 16 66 0 66 SET TYPE - CHAN ** NAME SERV UNIT SERVICE API AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 00 000 eO SIGM TDTP CU 506223 00 000 00 TPHI TDTP PU-S 506223 00 000 00 SBHF TDTP CU 506223 00 000 00 SBHN TDTP CU 506223 00 000 00 SIGC TDTP CU 506223 00 000 00 SIBH TDTP CU 506223 00 000 00 TRAT TDTP 506223 00 000 00 LeO1 TDTP 506223 00 000 00 SDSI TDTP CU 506223 00 000 00 0 3 I I 4 68 0000000000 0 3 1 1 4 68 0e00000000 0 3 1 [ 4 68 0000000000 0 3 ~ 1 4 68 0000000000 0 3 ~ I 4 68 0000000000 0 3 1 I 4 68 0000000000 0 3 1 I 4 68 0000000000 0 3 1 1 4 68 0000000000 0 3 ~ 1 4 68 0000000000 0 3 I I 4 68 000~000000 LI~ Tape'Verifica%ion Lis%lng Schlumberger Alaska Compu%ing Cen~er 7-AUG-1995 16:10 PAGE: 15 NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) BACK TDTP CPS 506223 00 0~0 00 ~ 3 1 1 4 68 0~000~0~00 FBAC TDTP CPS 5~6223 00 0~0 00 0 3 1 1 4 68 0000~00~00 TCAN TDTP CPS 506223 00 ~00 00 0 3 1 I 4 68 00000000~0 tcaf TDTP CPS 5~6223 ~0 0~0 00 0 3 1 ! 4 68 000~000~0~ TCND TDTP CPS 506223 00 0e0 00 e 3 1 1 4 68 000000000e TCFD TDTP CPS 506223 00 ~ee eo 0 3 1 1 4 68 e000000000 TSCN TDTP CPS 506223 00 0~0 Oe 0 3 1 1 4 68 00eooooe00 TSCF TDTP CPS 506223 00 00e eO 0 3 1 1 4 68 ~000000e00 INND TDTP CPS 506223 Oe 000 eO 0 3 1 1 4 68 eoeooooo~e INFD TDTP CPS 506223 00 000 ~0 0 3 1 I 4 68 0~0~0~0~00 GRCH TDTP GAPI 506223 ~0 ~0 0~ ~ 3 I I 4 68 ~0e0~0~000 TENS TDTP LB 506223 Oe 000 00 0 3 1 1 4 68 ~0000eooeo CCL TDTP V 506223 0~ 000 00 0 3 1 I 4 68 eee00000~o DATA DEPT. 9584.000 SIGM.TDTP 13.056 TPHI.TDTP 27.709 SBHF.TDTP SBHN.TDTP 35.255 SIGC.TDTP 2.509 SIBH.TDTP 35.255 TRAT.TDTP LC~I.TDTP 2.484 SDSI.TDTP 0.385 BACK.TDTP 278.012 FBAC.TDTP TCAN.TDTP 46281.625 TCAF.TDTP 18634.348 TCND.TDTP 28788.250 TCFD.TDTP TSCN.TDTP 9327.898 TSCF.TDTP 3755.687 INND.TDTP 1895.388 INFD.TDTP GRCH.TDTP -999.250 TENS,TDTP 1200,000 CCL,TDTP DEPT. 8898.0~0 SIGM.TDTP -999.250 TPHI.TDTP -999.250 SBHF.TDTP SBHN.TDTP -999.250 SIGC.TDTP -999.250 SIBH.TDTP -999.250 TRAT.TDTP LCO1,TDTP -999.250 SDSI,TDTP -999.250 BACK.TDTP -999,250 FBAC,TDTP TCAN,TDTP -999,250 TCAF.TDTP -999.250 TCND,TDTP -999,250 TCFD,TDTP TSCN.TDTP -999.250 TSCF.TDTP -999.250 INND.TDTP -999.250 INFD.TDTP GRCH,TDTP 64,750 TENS,TDTP -999.250 CCL.TDTP -999.250 23.177 1.904 66.598 9~12.191 379.518 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA **** FILE TRAILER FILE NAME : EDIT .003 SERVICE : FLIC VERSION : 001C01 DATE : 95/08/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verificat|on Listing Schlumberger Alaska Computing Center **~* FILE HEADER *~** FILE NAME : EDIT .e04 SERVICE : FLIC VERSION : 0~1C01 DATE : 95/08! 7 MAX REC SIZE : le24 FILE TYPE : LO LAST FILE : 7-AUG-1995 16:10 PAGE: 16 FILE HEADER FILE NUMBER: 4 EDITED CURVES Dep%h shifted and clipped curves for each pass ~n separate ~|les. PASS NUMBER: 4 DEPTH INCREMENT: ~.5000 FILE SUMMARY LDWQ TOOL CODE START DEPTH STOP DEPTH GRCH 9559.0 9068.0 SIGM 9584.0 9068.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GR PASS NUMBER: I ,EQUIVALENT UNSHIFTED DEPTH- BASELINE DEPTH GRCH SIGM 88888.0 88888.0 9575.5 9571.5 9567.5 9563.5 9559.5 9555.5 9541.5 9541.5 9537.5 9537.5 9533.5 9533.0 9517.5 9517.0 9513.5 9512.5 9509.5 9509.0 9505.5 9505.5 9503.5 9501.5 9501.5 9499.5 9497.5 9498.0 9495.5 9491.5 9487.5 88887.5 9575.0 9571.0 9566.5 9563.0 9559.0 9555.5 9503.5 9500.0 9496.5 9492.0 9488.5 LJ~S Tape Verii:ication List, ing Schlumberger Alaska Computing Center 7-AUG-1995 16:10 PAGE: 17 9483.5 9484.0 9473.5 9474.0 9469.5 9470.5 9465.5 9466.0 9461.5 9461.5 9459.5 9460.0 9455.5 9456.5 9451.5 9452.0 9449.5 9449.5 9447.5 9448.0 9445.5 9445.0 9443.5 9444.5 9441.5 9441.5 9439.5 944~.0 9437.5 9437.0 9433.5 9433.0 9431,5 9432,0 9429,5 9429.5 9427,5 9427,5 9425,5 9425,0 9423,5 9424.5 9421.5 9421,5 9417,5 9417,0 9409,5 94e9,0 9405.5 9405.5 9391.5 9392.5 9387.5 9388.0 9383.5 9384.0 9381.5 9381.5 9379.5 9379.5 9377.5 9377.0 9373.5 9373.0 9369.5 9369.5 9367.5 9367.5 9365.5 9365.0 9363.5 9362.5 9359.5 9359.5 100.0 99.5 100.0 $ REMARKS: THIS FILE CONTAINS BORAX PASS #1 OF THE TDTP. THE DEPTH CORRECTIONS SHOWN ABOVE REFLECT BORAX PASS #1 GRCH TO BASE PASS #1 GRCH AND BORAX PASS #1 SIGM TO BASE PASS #1 SIGM. ALL OTHER TDTP CURVES WERE CARRIED WITH THE SIGM SHIFTS. LIS FORMAT DATA LiS Tape Verif|ca~,|on L|sf, ing Schlumberger Alaska Compu%ing Cent, er 7-AUG-/995 16:10 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 2 66 0 3 73 92 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 PAGE: 18 SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT SIGM TDTP TPHI TDTP SBHF TDTP SBHN TDTP SIGC TDTP SIBH TDTP TRAT TDTP LC01TDTP SDSI 'I'DTP FT 5e6223 00 Oe~ Oe CU 5e6223 0~ eO~ 00 PU-S 506223 Oe 000 ~0 CU 506223 00 000 00 CU 506223 00 00~ ~0 CU 506223 00 000 ~0 CU 5e6223 00 000 00 5e6223 Oe 000 00 5e6223 eO 000 00 CU 506223 00 000 00 BACK TDTP CPS 5e6223 00 000 00 FBAC TDTP CPS 506223 00 000 00 TCAN TDTP CPS 506223 00 000 ~0 TCAF TDTP CPS 506225 00 000 00 TCND TDTP CPS 506223 00 000 00 TCFD 'rDTP TSCN TDTP TSCF TDTP INND TDTP INFD TDTP GRCH TDTP TENS TDTP CCL TDTP CPS 506223 00 e00 00 CPS 506223 00 000 Oe CPS 506223 eO 000 00 CPS 506223 00 000 00 CPS 5e6223 00 0e0 00 GAPI 506223 00 000 00 LB 506223 00 000 00 V 5e6223 00 000 00 e 4 1 I 4 68 ~000000000 0 4 I I 4 68 0000~00000 0 4 I I 4 68 0000e00000 0 4 I I 4 68 0000000000 0 4 I 1 4 68 0000000000 0 4 I I 4 68 0000000000 0 4 1 1 4 68 0000000000 0 4 1 1 4 68 00eoOOee00 0 4 1 1 4 68 0000e00000 0 4 1 1 4 68 0000000000 0 4 I I 4 68 oeooooooeo 0 4 1 1 4 68 0000000000 0 4 I 1 4 68 0000000000 0 4 1 1 4 68 0000000000 0 4 1 ! 4 68 0000eoe000 0 4 1 1 4 68 0000000000 0 4 1 1 4 68 0000000e00 0 4 1 1 4 68 0000000000 0 4 1 1 4 68 0000000000 0 4 1 1 4 68 0000000000 0 4 1 1 4 68 0000000000 0 4 1 1 4 68 0000000000 0 4 1 1 4 68 0000000000 LIS Tape Verification Lis%ing Schlumberger Alaska Compu%|ng ** DATA ** DEPT. 9583.5e0 SBHN.TDTP 88.981 LCO1.TDTP 1.824 TCAN.TDTP 1~79~.453 TSCN.TDTP 2e91.468 GRCH.TDTP -999.250 DEPT. 9340.000 SBHN.TDTP -999.250 LCO1.TDTP -999.250 TCAN.TDTP -999.250 TSCN.TDTP -999.250 GRCH.TDTP 48.750 Center 7-AUG-1995 16:10 SIGM.TDTP 17.863 TPHI.TDTP 19.096 SIGC.TDTP 0.000 SIBH.TDTP 130.415 SDSI.TDTP 0.618 BACK.TDTP 309.348 TCAF.TDTP 5917.063 TCND.TDTP 9567.158 TSCF.TDTP 1146.879 INND.TDTP 2016.390 TENS.TDTP 1510.0~0 CCL.TDTP 0.000 SIGM.TDTP SIGC.TDTP SDSI.TDTP TCAF.TDTP TSCF.TDTP TENS.TDTP -999.250 TPHI.TDTP -999.25e SIBH.TDTP -999.25e BACK.TDTP -999.250 TCND.TDTP -999.250 INND.TDTP -999.25e CCL.TDTP -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 SBHF.TDTP TRAT.TDTP FBAC.TDTP TCFD.TDTP INFD.TDTP SBHF.TDTP TRAT.TDTP FBAC.TDTP TCFD.TDTP INFD.TDTP PAGE: 77.928 1.338 75.049 3354.509 370.642 -999.250 -999.250 -999.250 -999.250 -999.250 END OF DATA **** FILE TRAILER FILE NAME : EDIT .004 SERVICE : FLIC VERSION : 001C01 DATE : 95/08/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .0e5 SERVICE : FLIC VERSION : eeicel DATE : 95/08/ 7 MAX EEC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: EDITED CURVES Depth shifted and PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY LDWG TOOL CODE GRCH SIGM 5 clipped 5 0.5000 curves START DEPTH 9559.0 9584.0 for each pass STOP DEPTH 9068.0 9068.0 in separate files. LIs Tape Ver|fication Listing Schlumberger Alaska Computing Center 7-AUG-~995 ~6:~ $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GR PASS NUMBER: BASELINE DEPTH GRCH EQUIVALENT UNSHIFTED DEPTH, SIGM 88888.0 88888.5 88888.5 9575.5 9576.0 9571.5 9571.5 9567.5 9567.5 9563.5 9563.0 9559.5 9559.5 9555.5 9556.0 9543,5 9544.0 9539.5 9539.5 9537.5 9538.0 9535,5 9535.5 9533.5 9534.0 9531,5 9532.0 9529.5 9529.5 9527.5 9527.5 9523,5 9523.5 9521.5 9521,5 9519.5 9520.0 9517.5 9517.0 9513.5 9513.5 9509.5 9509,0 9499.5 9500.0 9495.5 9496.5 9491.5 9492.0 9489.5 9489.5 9487.5 9488.5 9483.5 9484.0 9481.5 9481.5 9475.5 9476.0 9471,5 9472.5 9465,5 9466.0 9455.5 9456.5 9451,5 9452.0 9447.5 9448.5 9443.5 9444.5 9441.5 9442.0 9439.5 9440.0 9437.5 9437.5 9433,5 9433.5 9429.5 9430,0 9427.5 9428.0 9425.5 9425.5 9423,5 9425.0 9421,5 9422.0 9419.5 9421.0 PAGE: 20 LIS Tape Ver|ficat|on Listing Schlumberger Alaska Computing Center ?-AU~-~99~ ~6:~0 9417.5 9417.5 9415.5 9416.5 9409.5 9409.5 9405.5 9406.~ 9399.5 940~.5 9395.5 9397.0 9391.5 9392.5 9389.5 9390.0 9385.5 9385.5 9383.5 9384.5 9379.5 9380.0 9375.5 9376.0 9371.5 9371.5 9367.5 9367.5 9363.5 9363.0 9359.5 9360.0 9355.5 9355.5 9351.5 9351.5 9347.5 9348.0 9343.5 9343.5 9339.5 9340.0 $ REMARKS: THIS FILE CONTAINS BORAX PASS #2 OF THE TDTP. THE DEPTH CORRECTIONS SHOWN ABOVE REFLECT BORAX PASS #2 GRCH TO BASE PASS #1 GRCH AND BORAX PASS #2 SIGM TO BASE PASS #1 SIGM. ALL OTHER TDTP CURVES WERE CARRIED WITH THE SIGM SHIFTS. $ LIS FORMAT DATA PAGE: 21 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 68 13 66 0 14 65 FT LiS Tape Ver|~|cation L|st|ng Schlumberger Alaska Comput|ng Center 7-AUG-1995 16:10 PAGE: 22 TYPE REPR CODE VALUE 15 66 68 16 66 0 66 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API AP1 API AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 0~ 00~ ~ 0 5 1 1 4 68 000000~000 SIGM TDTP CU 506223 0~ ~00 0~ 0 5 1 1 4 68 ~000~000~0 TPHI TDTP PU-S 5~6223 00 ~0~ ~ 0 5 ! 1 4 68 0000000000 SBHF TDTP CU 506223 ~ ~00 00 0 5 ! 1 4 68 ~0000000~0 SBHN TDTP CU 506223 ~0 0~ 0~ 0 5 1 1 4 68 00~000000 SIGC TDTP CU 506223 ~ ~0 0~ 0 5 ! 1 4 68 0000000000 SIBH TDTP CU 506223 0~ 000 ~0 0 5 1 1 4 68 ~000000000 TRAT TDTP 506223 ~0 e00 ~0 0 5 ! 1 4 68 ~0~000000 LCd1 TDTP 506223 0~ 000 ~ 0 5 1 1 4 68 ~00~0~00~0 SDSI TDTP CU 506223 ~0 000 ~0 0 5 1 1 4 68 0000000~00 BACK TDTP CPS 506223 00 ~0 00 0 5 1 1 4 68 0000000000 FBAC TDTP CPS 506223 ~0 e00 eO 0 5 I 1 4 68 ~oeoooeoeo TCAN TDTP CPS 506223 ~e 0~0 eO 0 5 1 1 4 68 000000ee00 TCAF TDTP CPS 5e6223 00 TCND TDTP CPS 506223 ~ e00 eO e 5 1 1 4 68 ~eoeooe000 TCFD TDTP CPS 506223 Oe 0e0 ee e 5 1 1 4 68 00eoe00000 TSCN TDTP CPS 506223 00 TSCF TDTP CPS 506223 00 eoe oe 0 5 I i 4 68 00eoooee00 INND 'rDTP CPS 506223 00 e00 00 0 5 1 1 4 68 ~oeoeoe000 INFD TDTP CPS 506223 00 000 00 0 5 1 I 4 68 00000~0000 GRCH TDTP GAPI 506223 00 TENS TDTP LB 506223 00 CCL 'rDTP V 506223 DATA DEPT. 9584.500 SIGM.'rDTP 18.723 TPHI.TDTP 12.~47 SBHF.TDTP SBHN.TDTP 88.568 SIGC.TDTP 0.003 SIBH.TDTP 124.795 TRAT.TDTP LCO1,TDTP 1.460 SDSI.TDTP 0,783 BACK.TDTP 317.005 FBAC,TDTP TCAN.TDTP 8387.602 TCAF.TDTP 5743.063 TCND.'rDTP 850~.385 TCFD.TDTP TSCN.TDTP 1566.204 TSCF,TDTP 1072.393 INND.TDTP 2018.689 INFD,TDTP GRCH.TDTP -999.250 TENS.TDTP 1245.0~0 CCL.TDTP 0.000 DEPT SBHN TDTP LCO1 TDTP TCAN TDTP TSCN TDTP GRCH TDTP 9319.500 SIG~.TDTP -999.250 TPHI.TDTP -999.250 SBHF.'rDTP -999.250 SIGC.TDTP -999.250 SIBH.TDTP -999.250 TRAT.TDTP -999.250 SDSI.TDTP -999.250 BACK.TDTP -999.250 FBAC.TDTP -999.250 TCAF.TDTP -999.250 TCND.TDTP -999.250 TCFD.TDTP -999.250 TSCF.TDTP -999.250 INND.TDTP -999.250 INFD.TDTP 33.313 TENS.TDTP -999.250 CCL.TDTP -999.250 74.879 1.073 83.807 3192.768 346.944 -999.250 -999.250 -999.250 -999.250 -999.250 LIS Tape Verii=|cation Lis%lng Schlumberger Alaska Compu%ing Center 7-AUG-Z995 16:10 PAGE: 23 END OF DATA **** FILE TRAILER **** FILE NAME : EDIT .0e5 SERVICE : FLIC VERSION : eelcei DATE : 95/e8/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER FILE NAME : EDIT SERVICE : FLIC VERSION : oelc~l DATE : 95/08/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 6 EDITED CURVES Depth sh|~ted and clipped curves ~or each pass in separate ~iies. PASS NUMBER: 6 DEPTH INCREMENT: 0.S000 # FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9559.0 9068.0 SIGM 9584.0 9068.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GR PASS NUMBER: # EQUIVALENT UNSHIFTED DEPTH- BASELINE DEPTH GRCH SIGM 88888.0 88888.0 88887.5 9575.5 9575.0 9563.5 9563.0 9559.5 9560.0 9555.5 9555.5 LIS Tape Verificat,ion List,lng Schlumberger Alaska Comput,ing Cent, er 7-AUG-199~ ~6:~0 PAGE: 24 9533.5 9533.5 9531.5 9531.5 9529.5 9528.5 9527.5 9527.0 9523.5 9523.0 9519.5 9520.0 9517.5 9516.5 9515.5 9515.5 9513.5 9512.0 9511.5 9511.5 95e9.5 95e8.5 9507.5 9508.0 9503.5 9503.5 9499.5 9499.5 9497.5 9496.5 9495.5 9496.e 9491.5 9491.5 9487.5 9488.0 9483.5 9483.5 9479.5 9479.5 9475.5 9476.0 9469.5 9470.0 9465.5 9465.5 9455.5 9456.0 9451.5 9451.5 9447.5 9448.0 9441.5 9441.5 9437.5 9437.0 9433,5 9433,5 9431,5 9432,0 9429.5 9429,5 9427.5 9427,5 9425.5 9425.0 9423.5 9424.5 9421.5 9421.5 9419.5 9420.5 9415.5 9416.0 9407.5 9408.0 9403.5 94~4.5 9401.5 9401.5 9397.5 9397.0 9395.5 9396.5 9393.5 9393.5 9391.5 9392.0 9389.5 9389.0 9387.5 9388.0 9385.5 9385.0 9383.5 9383.5 9381.5 9381.5 9377.5 9377.0 9373.5 9373.5 9371.5 9371.5 9369.5 9369.5 9367.5 9367.0 9365.5 9365.0 LiS Tape Verification List|ng Schlumberger Alaska Comput|ng Center 7-AUG-1995 16:10 9363.5 9362.5 9359.5 9359.0 9355.5 9355.5 9351.5 9351.e 9347.5 9348.0 10~.0 99.5 100.5 $ REMARKS: THIS FILE CONTAINS BORAX PASS #3 OF THE TDTP. THE DEPTH CORRECTIONS SHOWN ABOVE REFLECT BORAX PASS #3 GRCH TO BASE PASS #1GRCH AND BORAX PASS #3 SIGM TO BASE PASS #1SIGM. ALL OTHER TDTP CURVES WERE CARRIED WITH THE SlGM SHIFTS. $ LIS FORMAT DATA PAGE: 25 ** DATA FORMAT SPECIFICATION RECORD ,, SET TYPE - 64EB ** TYPE REPR CODE VALUE I 66 2 66 0 3 73 92 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 00 000 00 SIGM TDTP CU 506223 00 0e0 00 TPHI TDTP PU-S 506223 00 000 00 SBHF TDTP CU 506223 00 000 00 SBHN 'rI)TP CU 506223 00 000 00 SIGC TDTP CU 506223 00 000 00 0 6 1 1 4 68 0000000000 0 6 1 1 4 68 0000000000 0 6 1 1 4 68 0000000000 0 6 1 1 4 68 0000000000 0 6 1 1 4 68 0000000000 0 6 1 1 4 68 0~00000000 LIS Tap~ Verification L|sting Schlumberger Alaska Computing Center 7-AUG-1995 16:10 PAGE: 26 NAME SERV UNIT SERVICE API AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) SIBH TDTP CU 506223 ea aaa aa a 6 I I 4 68 aaaaaoaaaa TRAY TDTP 5a6223 ee aaa aa a 6 1 1 4 68 aaaaaaaaaa SDSI TDTP CU 5a6223 oa aaa aa e 6 I 1 4 68 aaaaaaaaaa BACK TDTP CPS 5a6223 00 eaa aa 0 6 I I 4 68 aaaaaaaaee FBAC TDTP CPS 5a6223 oa aaa ae e 6 i 1 4 68 aaaeaaaaae TCAN TDTP CPS 5a6223 ae aaa aa a 6 1 I 4 68 aaaaaaaaaa TCAF TDTP CPS 5a6223 aa aaa aa e 6 I I 4 68 aaaoaaaaao TCND TDTP CPS 5a6223 aa aao aa 0 6 I I 4 68 aaa~aaaaaa TCFD TDTP CPS 5a6223 aa eoa aa 0 6 I 1 4 68 aaaaaooaoe TSCN TDTP CPS 5a6223 aa 00a aa a 6 I I 4 68 aaaaaaaaaa TSCF TDTP CPS 5a6223 ao aea aa 0 6 I I 4 68 aaaaaeeeaa INND TDTP CPS 506223 oa eaa aa 0 6 i 1 4 68 aaaaaaaoaa INFD TDTP CPS 5a6223 ae aaa aa a 6 1 1 4 68 aaaeaeeaae QRCH TDTP GAPI 5a6223 oa aaa aa e 6 I 1 4 68 aaaaaaaaae TENS TDTP LB 5a6223 ea aaa aa e 6 i I 4 68 aaaaaeaeee CCL TDTP V 506223 aO aaa aa 0 6 i 1 4 68 aoaaaaoaaa ** DATA DEPT. 9583.5aa SIGM.TDTP 20.261 TPHI.TDTP 19.624 SBHF.TDTP SBHN.TDTP 91.028 SIGC.TDTP e.aaa SIBH.TDTP 134.264 TRAT.TDTP LCal.TDTP 1.836 SDSI.TDTP 0.789 BACK.TDTP 304.928 FBAC.TDTP TCAN.TDTP 8178.a57 TCAF.TDTP 4455.262 TCND.TDTP 8484.412 TCFD.TDTP TSCN.TDTP 1639.559 TSCF.TDTP 893.220 INND.TDTP 1957.438 INFD.TDTP GRCH.TDTP -999.25a TENS.TDTP 121a.eae CCL.TDTP e.aao DEPT. 9331.5aa SIGM.TDTP -999.250 TPHI.TDTP -999.250 SBHF.TDTP SBHN.TDTP -999.25a SIGC.TDTP -999.250 SIBH.TDTP -999.250 TRAT.TDTP LCO1.TDTP -999.250 SDSI.TDTP -999.25a BACK.TDTP -999.250 FBAC.TDTP TCAN.TDTP -999.250 TCAF.TDTP -999.250 TCND.TDTP -999.250 TCFD.TDTP TSCN.TDTP -999.25a TSCF.TDTP -999.250 INND.TDTP -999.25a INFD.TDTP GRCH.TDTP la4.125 TENS.TDTP -999.250 CCL.TDTP -999.25a 75.855 1.288 81.629 2969.932 376.636 -999.250 -999.250 -999.250 -999.250 -999.25a END OF DATA **** FILE TRAILER **** FILE NAME : EDIT .aa6 SERVICE : FLIC VERSION : aelCai DATE : 95/a8/ T MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center ***, FILE HEADER FILE NAME : EDIT .007 SERVICE : FLIC VERSION : 001¢01 DATE : 95/e8/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 7-AUG-199S 16:10 PAGE: 27 FILE HEADER FILE NUMBER: 7 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT e.seee PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS SIGM 1~ 2~ 3 $ REMARKS: The arithmetic average of passes 1,2,~ 3 was computed after all depth shifts and clipping was applied. $ LIS FORMAT DATA DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 84 4 66 5 66 6 73 7 6~ 8 68 0.5 9 65 FT 11 66 12 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 L~S Tape Verification Listing Schlumberger Alaska Compu%ing Center 7-AUG-1995 16:10 PAGE: 28 SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOg TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 eO 00e eO 0 7 1 1 4 68 0000000000 SIGM PNAV CU 506223 00 000 eO 0 7 I 1 4 68 0000e00000 TPHI PNAV PU-S 5~6223 00 ~0~ ~0 0 7 I 1 4 68 ~0~00000~0 SBHF PNAV CU 506223 0~ 000 ~0 0 7 1 1 4 68 00000~00~0 SBHN PNAV CU 506223 0~ 00~ 00 0 7 1 1 4 68 0000000000 SIGC PNAV CU 5e6223 ee 000 ee 0 7 1 1 4 68 0ee0000000 SIBH PNAV CU 5e6223 ee 000 00 0 7 1 I 4 68 000000e000 TRAT PNAV 506223 ~0 000 eO 0 7 1 I 4 68 00000000e0 SDSI PNAV CU 5e6223 00 oee oe 0 7 1 1 4 68 00eoeooe00 BACK TDTP CPS 506223 ee oe~ eo e 7 1 1 4 68 oeoe000000 FBAC TDTP CPS 5e6223 eO oee ee 0 7 I 1 4 68 oeooooooeo TCAN PNAV CPS 506223 eO e00 ee 0 7 I 1 4 68 00000000e0 TCAF PNAV CPS 5e6223 Oe 000 00 e 7 I I 4 68 000000e0~0 TCND PNAV CPS 506223 00 000 Oe 0 7 1 1 4 68 e~eoooooeo TCFD PNAV CPS 506223 Oe e00 Oe 0 7 1 1 4 68 00eoeoeoeo TSCN PNAV CPS 506223 00 0e0 eO 0 7 1 1 4 68 00eoeoeoeo TSCF PNAV CPS 506223 ee oee eo 0 7 1 1 4 68 e000000000 INND PNAV CPS 5~6223 00 ~0~ 00 0 7 1 I 4 68 ~0e~0 INFD PNAV CPS 506223 00 0~0 00 0 7 1 I 4 68 eeeeeeeeee LC01PNAV 506223 00 000 00 0 7 I I 4 68 00000000~0 GRCH TDTP GAP[ 5e6223 00 eoe 00 0 7 1 ! 4 68 000eeoeoeo DATA ** DEPT. 9584.ee0 SIQM.PNAV 13.479 TPHI.PNAV 27.953 SBHF.PNAV SBHN.PNAV 34.587 SIGC.PNAV 2.199 SIBH.PNAV 34.587 TRAT.PNAV SDSI.PNAV 0.354 BACK.TDTP 93.478 FBAC.TDTP 27.335 TCAN.PNAV TCAF.PNAV 19233.758 TCND.PNAV 29466.477 TCFD.PNAV 9255.348 TSCN.PNAV TSCF.PNAV 3829.960 INND.PNAV 2067.424 INFD.PNAV 388.80~ LCO1.PNAV GRCH.TDTP -999.250 DEPT. 8896.500 SIGM.PNAV -999.250 TPHI.PNAV -999.25e SBHF.PNAV SBHN.PNAV -999.250 SIGC.PNAV -999.250 SIBH.PNAV -999.250 TRAT.PNAV SDSI.PNAV -999.250 BACK.TDTP -999.250 FBAC.TDTP -999.250 TCAN.PNAV TCAF.PNAV -999.250 TCND.PNAV -999.250 TCFD.PNAV -999.250 TSCN.PNAV TSCF.PNAV -999.250 INND.PNAV -999.250 INFD.PNAV -999.250 LCO1.PNAV GRCH.TDTP 40.438 24.768 1.897 47774.289 9513.742 2.484 -999.250 -999.250 -999.250 -999.250 -999.250 END OF DATA L~S Tape~ Ver|fJcation List|ng Schlumberger Alaska Comput|ng Cent, er **** FILE TRAILER FILE NAME : EDIT .007 SERVICE : FLIC VERSION : 001C0! DATE : 95/08/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 7-AUG-1995 16:~0 PAGE: 29 **** FILE HEADER **** FILE NAME : EDIT .e08 SERVICE : FLIC VERSION : OelCe! DATE : 95/08/ 7 MAX REC SIZE : 1~24 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP $ LOG HEADER DATA 9584.0 8895.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 25-JUL-g5 42.2 ~22 25-JUL-95 9596.0 9590.0 8898.0 9583.0 ~800.0 NO TOOL NUMBER TDTP GAMMA RaY CGRS-A 863 TDTP THERMAL DECAY CPSC-A 795 TDTP THERMAL DECAY TDIC-A 796 TDTP THERMAL DECAY TNC-P 50 TDTP THERMAL DECAY TND-P 78 TDTP THERMAL DECAY TNG-P 2~ LI~ Tape Verificat,ion Listing Schlumberger Alaska Compuf,|ng Cent, er 7-AUG-1995 16:10 PAGE: 30 TDTP THERMAL DECAY TDTP THERMAL DECAY $ MNTRN 8496 CTSM-A 202 BOREHOLE AND CASING DATA OPEN HOLE BlT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 3521.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): CRUDE/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHC LOG OF 3~-JULY-1988. TOTAL VOLUMES PUMPED: 293 BBLS CRUDE PREFLUSH, le0 BBLS BO 93 BBLS SPACER, AND 10 BBLS BORAX ~OC PICKED AT 9520~ THE BORAX LOG SHOWS NO APPARENT UPWARD CHANNELLING. $ LIS FORMAT DATA LIS Tape Verifica%ion List,ing Sch I umberger A I aska Comput,i ng Cent, er 7-AUG-1995 16:10 DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 SET TYPE - CHAN ** PAGE: 31 NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 00 000 00 0 8 I 1 4 68 0000000000 SIGM PS1 CU 506223 00 000 00 0 8 I I 4 68 0000000000 TPHI PS1 PU 506223 00 000 00 0 8 I I 4 68 0000000000 SBHF PS/ CU 506223 00 000 00 0 8 1 1 4 68 0000000000 SBHN PS1 CU 506223 00 000 00 0 8 1 1 4 68 0000000000 SIGC PS/ CU 506223 00 000 00 0 8 1 1 4 68 0000000000 SIBH PS1 CU 506223 00 000 00 0 8 1 1 4 68 0000000000 TRAT PS1 506223 00 000 00 0 8 1 1 4 68 0000000000 LCeZ PSZ 506223 00 000 00 0 8 1 1 4 68 0000000000 SDSI PS1 CU 506223 00 000 00 e 8 1 1 4 68 0000000000 BACK PS1 CPS 506223 00 000 00 0 8 1 I 4 68 0000000000 FBAC PS/ CPS 506223 00 000 00 0 8 1 1 4 68 0000000000 TCAN PS1 CPS 506223 00 000 00 0 8 I 1 4 68 0000000000 TCAF PS1 CPS 506223 00 000 00 0 8 1 1 4 68 0000000000 TCND PS/ CPS 506223 00 000 00 0 8 I I 4 68 0000000000 TCFD PS1 CPS 506223 00 000 00 0 8 1 I 4 68 0000000000 TSCN PS1 CPS 506223 00 000 00 0 8 1 1 4 68 0000000000 TSCF PS1 CPS 506223 00 000 00 0 8 1 1 4 68 0000000000 INND PS/ CPS 506223 00 000 00 0 8 1 I 4 68 0000000000 INFD PS! CPS 506223 00 000 00 0 8 1 1 4 68 0000000000 TENS PS1 LB 506223 00 000 00 0 8 1 1 4 68 0000000000 GR PS1 GAPI 506223 00 000 00 0 8 1 1 4 68 0000000000 CCL PS1 V 506223 ee eee 00 0 8 1 1 4 68 0000000000 Lis Tape Verification Listing Schlumberger Alaska Computing Center DATA DEPT. 9606.000 SIGM. SBHN.PS1 143.158 SIGC. LC~I.PS1 0.090 SDSI. TCAN.PS1 0.~ TCAF. TSCN.PS1 0.909 TSCF. TENS.PS1 1055.09~ GR. DEPT. 8893.5~0 SIGM. SBHN.PS1 54.387 SIGC. LCOI.PS1 3.269 SDSI. TCAN,PS1 24486,344 TCAF, TSCN,PS1 2623.747 TSCF, TENS.PS1 1225.990 GR. PS1 PS1 PS1 PS1 PS1 PS1 PS1 PS1 PS1 PS1 PSI PSI END OF DATA 7-AUG-1995 16:10 29.592 TPHI.PS1 ~.~0~ SIBH.PS1 1.273 BACK.PS1 ~.~ee TCND.PS1 0.00~ INND.PS1 26.875 CCL.PS1 29.031 TPHI.PS1 2.129 SIBH.PS1 0.659 BACK.PS1 6792.5e0 TCND.PS1 802.499 INND.PS1 43.594 CCL.PS1 e.e00 SBHF.PS1 184.924 TRAT.PS1 23.531 FBAC.PS1 -286.172 TCFD.PS1 -0.800 INFD.PS1 0.~21 54.928 SBHF.PS1 72.904 TRAT.PS1 176.e71 FBAC.PS1 19185.969 TCFD.PS1 2395.498 INFD.PS1 PAGE: 32 125.265 0.990 21.389 -256.96~ -0.727 46.740 1.935 37.686 4439.541 344.495 **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : ~01C91 DATE : 95/e8/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER FILE NAME : EDIT .e09 SERVICE : FLIC VERSION : ~01C~1 DATE : 95/98/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER RAW CURVES Curves and log PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY VENDOR TOOL CODE TDTP $ header data 2 0. 5900 for each START DEPTH 9584.0 pass in separate ~iles; STOP DEPTH 8896.0 raw background pass in last file LIS Tape Verification Lis%|ng Schlumberger Alaska Compu%|ng Center 7-AUG-lgg5 16:1~ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 25-JUL-g5 42.2 I022 25-JUL-g5 9596.0 9590.0 8898.0 9583.0 18~0.0 NO TOOL NUMBER TDTP GAMMA RAY CGRS-A 863 TDTP THERMAL DECAY CPSC-A 795 TDTP THERMAL DECAY TDIC-A 796 TDTP THERMAL DECAY TNC-P 5~ TDTP THERMAL DECAY TND-P 78 TDTP THERMAL DECAY TNG-P 21 TDTP THERMAL DECAY MNTRN 8496 TDTP THERMAL DECAY CTSM-A 2~2 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 3521.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): CRUDE/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): O FAR COUNT RATE HIGH SCALE (CPS): 12500 PAGE: 33 LIS Tape Verification List, lng Schlumberger Alaska Computing Cent, er 7-AUG-1995 16:10 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 300~0 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHC LOG OF 30-JULY-1988. TOTAL VOLUMES PUMPED: 293 BBLS CRUDE PREFLUSH, 100 BBLS BO 93 BBLS SPACER, AND 10 BBLS BORAX ~OC PICKED AT 9520' THE BORAX LOG SHOWS NO APPARENT UPWARD CHANNELLING. $ LIS FORMAT DATA PAGE: 34 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 12 68 13 66 0 14 65 FT 15 66 68 16 66 ~ 66 SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API AP1 API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 00 0~0 ~0 0 9 I I 4 68 0000000000 SIGM PS2 CU 506223 00 ~00 00 0 9 I I 4 68 0000000000 TPHI PS2 PU 506223 00 000 00 0 9 I I 4 68 0000000000 SBHF PS2 CU 506223 00 000 00 0 g 1 1 4 68 0000000000 SBHN PS2 CU 506223 00 000 00 0 9 1 1 4 68 0000000000 SIGC PS2 CU 506223 00 000 00 0 9 1 1 4 68 0000000000 SIBH PS2 CU 506223 00 000 00 0 9 1 1 4 68 0000000000 TRAT PS2 506223 00 000 00 0 9 1 1 4 68 0000000000 LC01 PS2 506225 00 000 00 0 9 1 1 4 68 0000000000 SDSI PS2 CU 506223 00 000 00 0 9 1 1 4 68 0000000000 L'IS Tape Verif|cat|on Listing Schlumberger Alaska Computing Center 7-AUG-1995 16:10 PAGE: 35 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) BACK PS2 CPS 506223 00 000 00 0 9 1 I 4 68 0000000000 FBAC PS2 CPS 5~6223 00 000 00 0 9 I I 4 68 0000000000 TCAN PS2 CPS 506223 00 00~ 00 0 9 1 I 4 68 0000000000 TCAF PS2 CPS 506223 00 000 00 0 9 1 I 4 68 eeeeeeeeee TCND PS2 CPS 5~6223 00 000 00 0 9 1 I 4 68 eezz~eeeee TCFD PS2 CPS 506223 00 zee 00 0 9 1 I 4 68 00000000e0 TSCN PS2 CPS 506223 00 000 00 0 9 1 I 4 68 eeeeeeeeee TSCF PS2 CPS 506223 00 e00 00 0 9 1 I 4 68 0000000000 INND PS2 CPS 506223 ee 000 0e z 9 1 1 4 68 eeeeeeeeee INFD PS2 CPS 5~6223 00 000 00 0 9 1 1 4 68 eeeeezzeze TENS PS2 LB 506223 00 zee e0 0 9 I 1 4 68 eezezeeeee GR PS2 GAPI 5~6223 ~0 000 00 0 9 1 I 4 68 0000~eeeee CCL PS2 V 506223 ee ~0 ee e 9 I i 4 68 eeeeeeeeee DATA DEPT. 9606.500 SIGM.PS2 SBHN.PS2 54.387 SIGC.PS2 LCO1.PS2 3.269 SDSI.PS2 TCAN.PS2 24486.344 TCAF.PS2 TSCN.PS2 2623.747 TSCF.PS2 TENS.PS2 970.000 GR.PS2 DEPT. 8893.000 SIGM.PS2 SBHN.PS2 52.686 SIGC.PS2 LCO1.PS2 3.240 SDSI.PS2 TCAN.PS2 22202.688 TCAF.PS2 TSCN.PS2 2552.122 TSCF.PS2 TENS.PS2 1180.000 GR.PS2 29.031 TPHI.PS2 2.129 SIBH.PS2 0.659 BACK.PS2 6792.500 TCND.PS2 802.499 INND.PS2 206.750 CCL.PS2 29.978 TPHI.PS2 2.010 SIBH.PS2 1.041 BACK.PS2 6198.078 TCND.PS2 787.619 INND.PS2 54.563 CCL.PS2 54.928 SBHF.PS2 72.904 TRAT.PS2 176.071 FBAC.PS2 19185.969 TCFD.PS2 2305.498 INFD.PS2 0.021 54.536 SBHF.PS2 68.789 TRAT.PS2 243.910 FBAC.PS2 18720.207 TCFD.PS2 2272.240 INFD.PS2 46.740 1.935 37.686 4439.541 344.495 45.571 1.921 49.753 4303.623 322.876 END OF DATA **** FILE TRAILER FILE NAME : EDIT .009 SERVICE : FLIC VERSION : 001C01 DATE : 95/08/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tap~ Verification Lis~ing Schlumberger Alaska Computing Center *~*, FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : OO1C~1 DATE : 95/08/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 7-AUG-1995 16:10 PAGE: 36 FILE HEADER FILE NUMBER RAW CURVES Curves and log header data for each pass in separate PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP $ LOG HEADER DATA 9584.0 8896.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 25-JUL-95 42.2 1022 25-JUL-g5 9596.0 9590.0 8898,0 9583.0 1800.~ NO TOOL NUMBER 'T'DTP GAMMA RAY CGRS-A 863 TDTP THERMAL DECAY CPSC-A 795 TDTP THERMAL DECAY TDIC-A 796 TDTP THERMAL DECAY TNC-P 50 TDTP THERMAL DECAY TND-P 78 TDTP THERMAL DECAY TNG-P 21 'I'DTP THERMAL DECAY MNTRN 8496 TDTP THERMAL DECAY CTSM-A 202 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS 3521.0 LIS Tape Verifica~,ion Lisf, ing Sch I umberger Al aska Compu%i ng Cenf, er 7-AUG-1995 16:10 FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): CRUDE/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN 0IL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): O FAR COUNT RATE HIGH SCALE (CPS): 12500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): aeeee TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHC LOG OF 3e-JULY-1988. TOTAL VOLUMES PUMPED: 293 BBLS CRUDE PREFLUSH, le0 BBLS BO 93 BBLS SPACER, AND 10 BBLS BORAX -- GOC PICKED AT 9520~ THE BORAX LOG SHOWS NO APPARENT UPWARD CHANNELLING. $ # LIS FORMAT DATA PAGE: 37 ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FT LiS Tape Varig|cation L|st|ng Schlumberger Alaska Compu%|ng Center 7-AUG-1995 16:10 PAGE: 38 TYPE EEPR CODE VALUE l! 66 ll 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 00 0a0 aa a la 1 1 4 68 aaaaaaaaaa SIGM PS3 CU 506223 aa aaa aa a la 1 1 4 68 aaaaaaaaaa TPHI PS3 PU 5a6223 aa aaa aa a la 1 1 4 68 aaaaaaaaaa SBHF PS3 CU 5a6223 aa aaa aa a la 1 1 4 68 aaaaaaaaoa SBHN PS3 CU 5a6223 aa aaa aa a la 1 1 4 68 aaaaaaaaaa sIGc PS3 cu 5a6223 aa aaa aa a la 1 1 4 68 aaaaaaaaaa LCal PS3 506223 aa aaa az a la 1 1 4 68 aaeaaaaeaa BACK PS3 CPS 5a6223 aa aaa aa a la 1 1 4 68 aaaaaaaaaa TCAN PS3 CPS 5a6223 aa aaa aa a le [ 1 4 68 aaaaaeaaea TCND PS3 CPS 5a6223 aa aaa aa a la 1 1 4 68 aaeaaaaeaa TCFD PS3 CPS 506223 aa aaa aa a la 1 1 4 68 aaaaaaeeaa TSCN PS3 CPS 506223 aa aaa aa 0 la 1 1 4 68 aaaaaaaeaa TSCF PS3 CPS 5a6223 aa aaa ea a la 1 1 4 68 aaaaaaaaaa INND PS3 CPS 5a6223 aa aaa aa a la 1 1 4 68 aaaaaaaaaa INFD PS3 CPS 506223 aa aaa aa a la 1 1 4 68 aaaaeaaaaa TENS PS3 LB 5a6223 aa aaa aa a la 1 1 4 68 aaaaaaaaaa GR PS3 GAPI 5a6223 aa aaa aa a la 1 1 4 68 oaaaaoaaaa CCL PS3 V 5a6223 aa aaa aa a la 1 1 4 68 aaoaaaaoaa DATA DEPT. 9616.500 SIGM.PS3 SBHN.PS3 52.686 SIGC.PS3 LCal.PS3 3.24a SDSI.PS3 TCAN.PS3 222a2.688 TCAF.PS3 TSCN.PS3 2552.122 TSCF.PS3 TENS.PS3 845.aaa GE.PS3 29.978 TPHI.PS3 2.ala SIBH.PS3 1.a41 BACK.PS3 6198,a78 TCND.PS3 787.619 INND,PS3 98,688 CCL.PS3 54.536 SBHF.PS3 68.789 TEAT.PS3 243.91a FBAC.PS3 1872a.2a7 TCFD.PS3 2272.24a INFD.PS3 0.021 45.571 1.921 49.753 43a3.623 322.876 LIS Tape~Verif|cation Listing Schlumberger Alaska Computing Center DEPT. 8896.000 SIGM.PS3 SBHN.PS3 53.588 SIGC.PS3 LCO1.PS3 3.014 SDSI.PS3 TCAN.PS3 27586,582 TCAF.PS3 TSCN.PS3 3245,817 TSCF,PS3 TENS.PS3 119~.~0 GR.PS3 7-AUG-1995 16:10 25.560 TPHI.PS3 2.096 SIBH.PS3 0.584 BACK.PS3 8286.244 TCND.PS3 1076.841 INND.PS3 57.0~0 CCL.PS3 48.063 70.970 272.347 20633.098 2363.504 0.e00 SBHF.PS3 TRAT.PS3 FBAC.PS3 TCFD.PS3 INFD.PS3 PAGE: 39 46.806 1.898 59.120 5053.426 346.478 END OF DATA **** FILE TRAILER FILE NAME : EDIT .010 SERVICE : FLI¢ VERSION : eelcel DATE : 95/08/ 7 MAX RE¢ SIZE : le24 FILE TYPE : LO LAST FILE : **** FILE HEADER FILE NAME : EDIT SERVICE : FLIC VERSION : 001C01 DATE : 95/08/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP 9584.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): 9068.0 25-JUL-95 42.2 1022 25-JUL-95 9596.0 9590.0 8898.0 9583.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 7-AUG-1995 16:10 LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 1800.0 NO TOOL NUMBER TDTP GAMMA RAY CGRS-A 863 TDTP THERMAL DECAY CPSC-A 795 TDTP THERMAL DECAY TDIC-A 796 TDTP THERMAL DECAY TNC-P 50 TDTP THERMAL DECAY TND-P 78 TDTP THERMAL DECAY TNG-P 21 TDTP THERMAL DECAY MNTRN 8496 TDTP THERMAL DECAY CTSM-A 202 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 3521.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): CRUDE/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12500 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHC LOG Of 30-JULY-1988. TOTAL VOLUMES PUMPED: 293 BBLS CRUDE PREFLUSH, 100 BBLS BO 93 BBLS SPACER, AND 10 BBLS BORAX ~OC PICKED AT 9520~ THE BORAX LOG SHOWS NO APPARENT UPWARD CHANNELLING. PAGE: 40 LIS Tape'Ver|fication Listing Schlumberger Alaska Comput|ng Center $ LIS FORMAT DATA 7-AUG-1995 16:10 PAGE: 41 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 68 13 66 14 65 FT 15 66 68 16 66 0 66 SET TYPE - CHAN ** NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 ~0 0~ 0~ ~ 11 I I 4 68 0000000000 SIGM PS4 CU 506223 ~ ~ ~ ~ 11 I I 4 68 0000000000 TPHI PS4 PU 506223 ~ ~ ~ ~ 11 I I 4 68 00000~0000 SBHF PS4 CU 506223 00 ~00 00 0 11 I I 4 68 0000000000 SBHN PS4 CU 506223 ge ~ ge e 11 I 1 4 68 000~0000~0 SIGC PS4 CU 506225 00 0e0 ~0 0 11 I 1 4 68 00~0000000 SIBH PS4 CU 506225 00 000 00 0 11 1 1 4 68 0000000000 TRAT PS4 506225 00 000 00 0 11 I I 4 68 0000000000 LC01 PS4 506223 00 000 00 0 11 I I 4 68 0000000000 SDSI PS4 CU 506223 00 000 00 0 11 1 1 4 68 0000000000 BACK PS4 CPS 506223 00 000 eO 0 11 1 1 4 68 0000000000 FBAC PS4 CPS 506223 00 000 00 0 11 1 1 4 68 0000000000 TCAN PS4 CPS 506223 ~ ~0~ ~0 ~ 11 I I 4 68 0000000000 TCAF PS4 CPS 506223 00 000 00 0 11 I I 4 68 0000000000 TCND PS4 CPS 506223 ge ~0~ e~ e 11 1 1 4 68 0000000000 TCFD PS4 CPS 506223 00 000 ge e 11 1 1 4 68 0000000000 TSCN PS4 CPS 506225 00 000 00 0 11 1 1 4 68 eeeeeeeeee TSCF PS4 CPS 506225 00 000 ~ ~ 11 I I 4 68 0000000000 INND PS4 CPS 506225 00 000 00 0 11 1 1 4 68 0000000000 LIS Tape Verification L|st|ng Schlumberger Alaska Comput|ng Center 7-AUG-1995 16:[0 PAGE: 42 NAME SERV UNIT SERVICE API AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) INFD PS4 CPS 506223 00 000 ~ ~ 11 I I 4 TENS PS4 LB 506223 ~ ~ ~ ~ 11 I I 4 GR PS4 GAPI 506223 0~ 000 00 ~ 11 1 1 4 CCL PS4 V 506223 00 0~0 00 ~ 11 I 1 4 DATA DEPT. 9606.000 SIGM.PS4 SBHN.PS4 77.490 SIGC.PS4 LCO1.PS4 2.297 SDSI.PS4 TCAN.PS4 22247.430 TCAF.PS4 TSCN.PS4 4449.743 TSCF.PS4 TENS.PS4 1045.000 GR.PS4 16.339 TPHI.PS4 3e.376 SBHF.PS4 0.135 SIBH.PS4 126.239 TRAT.PS4 0.330 BACK.PS4 322.388 FBAC.PS4 9685.143 TCND.PS4 16003.275 TCFD.PS4 1937.140 INND.PS4 2286.154 INFD.PS4 79.063 CCL.PS4 ~.~21 61.495 1.729 130.571 5252.654 366.372 DEPT. 9340.50e SIGM.PS4 9.903 TPHI.PS4 13.315 SBHF.PS4 57.325 SBHN.PS4 80.636 SIGC.PS4 0.0e2 SIBH.PS4 111.696 TRAT.PS4 1.354 LC~I.PS4 1.603 SDSI.PS4 0.126 BACK.PS4 279.030 FBAC.PS4 59.285 TCAN.PS4 59161.383 TCAF.PS4 36897.172 TCND.PS4 24958.398 TCFD.PS4 12786.742 TSCN.PS4 11557.730 TSCF.PS4 72~8.2e9 INND.PS4 2181.042 INFD.PS4 457.403 TENS.PS4 1260.00e GE.PS4 48.750 CCL.PS4 0.00e END OF DATA =*** FILE TRAILER FILE NAME : EDIT .~11 SERVICE : FLIC VERSION : 001C~1 DATE : 95/08/ T MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : eelCel DATE : 95/08/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER LIS Tape'Verification Listing Schlumberger Alaska Computing Center 7-AUG-1995 16:10 PAGE: 43 FILE NUMBER 12 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 5 DEPTH INCREMENT: 0.S000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP $ LOG HEADER DATA 9584.0 9068.0 DATE LOGGED: SOFTWARE VERSION: T3:ME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 25-JUL-95 42.2 1022 25-JUL-95 9596.0 959e.9 8898.9 9583.9 1899.9 NO TOOL NUMBER TDTP GAMMA RAY CGRS-A 863 TDTP THERMAL DECAY CPSC-A 795 TDTP THERMAL DECAY TDIC-A 796 TDTP THERMAL DECAY TNC-P TDTP THERMAL DECAY TND-P 78 TDTP THERMAL DECAY TNG-P 21 TDTP THERMAL DECAY MNTRN 8496 TDTP THERMAL DECAY CTSM-A 292 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/0IL RATI0: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERWAL OR THERMAL): 352[.9 CRUDE/BORAX LIS Tape Veri~icat|on Listing Schlumberger Alaska Computlng Center 7-AUG-~99S ~6:~0 MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 9 FAR COUNT RATE HIGH SCALE (CPS): 12599 NEAR COUNT RATE LOW SCALE (CPS): 9 NEAR COUNT RATE HIGH SCALE (CPS): 39999 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHC LOG OF $9-JULY-1988. TOTAL VOLUMES PUMPED: 293 BBLS CRUDE PREFLUSH, 199 BBLS BO 93 BBLS SPACER, AND 19 BBLS BORAX ~OC PICKED AT 9529~ THE BORAX LOG SHOWS NO APPARENT UPWARD CHANNELLING. LIS FORMAT DATA PAGE: 44 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 9 2 66 9 3 73 92 4 66 5 66 6 73 7 65 8 68 9.5 9 65 FT 11 66 12 68 13 66 9 14 65 FT 15 66 68 16 66 0 66 LIS Tape Veri~|cat|on L|sting Schlumberger Alaska Computing Center SET TYPE - CHAN ** 7-AUG-1995 16:10 PAGE: 45 NAME SERV UNIT SERVICE AP1 AP1 AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER ~ LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 00 000 00 0 12 1 1 4 68 0e00090090 SIGM PS5 CU 5e6223 e9 zee ee e 12 1 1 4 68 eegeeeegg9 TPHI PS5 PU 5e6223 e9 zee ee 9 12 1 1 4 68 gggegeeege SBHF PS5 CU 5e6223 e9 zee ee e 12 1 1 4 68 egeeeeegee SBHN PS5 CU 5e6223 e9 zee ee 9 12 1 1 4 68 eggeegggee SIGC PS5 CU 5e6223 ee zee ee 9 12 1 1 4 68 ggeeeggee9 SIBH PS5 CU 5e6223 e9 zee ee e 12 1 1 4 68 eggeeegeee TEAT PS5 5e6223 e9 zee ee e 12 I I 4 68 ggeeegeeeg Lee1 PS5 5e6223 e9 zee ge 9 12 1 1 4 68 egeeegeeee SDSI PS5 CU 596223 99 ee9 ge g 12 1 1 4 68 geeeggeee9 BACK PS5 CPS 5e6223 99 zee ee 9 12 1 1 4 68 geeegggeee FBAC PS5 CPS 596223 ge ggg ee e 12 1 1 4 68 eeeeeeeegg TCAN PS5 CPS 596223 g9 egg ee e 12 1 1 4 68 eeegegegg9 TCAF PS5 CPS 5e6223 e9 gge eg e 12 I 1 4 68 eggeeeeeee TCND PS5 CPS 596223 ee gge ee 9 12 I 1 4 68 egegeeggee TCFD PS5 CPS 5e6223 eg eeg gg g 12 I I 4 68 egeegggee9 TSCN PS5 CPS 5e6223 99 zee ge 9 12 1 1 4 68 ggeeegeee9 TSCF PS5 CPS 596223 ge ggg ee e 12 I 1 4 68 eegeeeggge INND PS5 CPS 596223 ge ege eg e 12 1 1 4 68 egggeeggg9 INFD PS5 CPS 5e6223 99 egg ge g 12 I 1 4 68 geegggeee9 TENS PS5 LB 596223 e9 eeg ee 9 12 I I 4 68 ggggggeggg GR PS5 GAPI 596223 ee zee gg e 12 I 1 4 68 gegegeegeg CCL PS5 V 5e6223 e9 eeg gg g 12 I 1 4 68 gegegggege DATA DEPT. 96e6.ggg SIGM.PS5 SBHN.PS5 89.636 SIGC.PS5 LCgl.PS5 1.693 SDSI.PS5 TCAN.PS5 59161.383 TCAF.PS5 TSCN.PS5 11557.730 TSCF.PS5 TENS.PS5 925.g90 GR.PS5 DEPT. 9319.599 SIGM.PS5 SBHN.PS5 81.868 SIGC.PS5 LC91.PS5 1.638 SDSI.PSS TCAN.PS5 58975.1e2 TCAF.PS5 TSCN.PS5 19797.654 TSCF.PSS TENS.PS5 1235.ggg GR.PSS 9.993 TPHI.PS5 9.e92 SIBH.PS5 9.126 BACK.PS5 36897.172 TCND.PS5 7298.299 INND.PS5 117.e63 CCL.PS5 19.389 TPHI.PS5 9.ge6 SIBH.PS5 9.144 BACK.PS5 35464.734 TCND.PS5 6593.8g6 INND.PS5 33.313 CCL.PS5 13.315 SBHF.PS5 111.696 TRAT.PS5 279.939 FBAC.PS5 24958.398 TCFD.PS5 2181.942 INFD.PS5 9.921 14.932 SBHF.PS5 115.7e5 TRAT.PS5 273.566 FBAC.PS5 23838.758 TCFD.PS5 2229.695 INFD.PS5 57.325 1.354 59.285 12786.742 457.4e3 59.e87 1.370 51.815 11959.e45 469.565 END OF DATA ~ ~ r ~ LIS Tape Verification Listing Schlumberger Alaska Computing Center **** FILE TRAILER **~ FILE NAME : EDIT .~12 SERVICE : FLIC VERSION : 0~1C01 DATE : 95/08/ 7 MAX REC SIZE : le24 FILE TYPE : LO LAST FILE : 7-AUG-1995 16:10 PAGE: 46 **** FILE HEADER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : eelcel DATE : 95/e8/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 13 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 6 DEPTH INCREMENT: o.5eeo FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP $ LOG HEADER DATA 9584.0 9e68.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 25-JUL-95 42.2 1022 25-JUL-95 9596.0 9590.0 8898.0 9583.~ 1800.0 NO TOOL NUMBER 'rDTP GAMMA RAY CGRS-A 863 TDTP THERMAL DECAY CPSC-A 795 TDTP THERMAL DECAY 'I'DIC-A 796 TDTP THERMAL DECAY TNC-P 50 TDTP THERMAL DECAY TND-P 78 TDTP THERMAL DECAY TNG-P 21 LIS Tape Verification Listing Schlumberger Alaska Comput|ng Center 7-AUG-1995 16:10 PAGE: 47 TDTP THERMAL DECAY TDTP THERMAL DECAY $ MNTRN 8496 CTSM-A 202 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 3521.~ BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): CRUDE/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 125ee NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 3~000 TOOL STANDOFF (IN): REMARKS: CORRELATED TO SWS BHC LOG OF 30-JULY-[988. TOTAL VOLUMES PUMPED: 293 BBLS CRUDE PREFLUSH, 100 BBLS BO 93 BBLS SPACER, AND 10 BBLS BORAX ~OC PICKED AT 9520' THE BORAX LOG SHOWS NO APPARENT UPWARD CHANNELLING. $ LIS FORMAT DATA LIS Tape Verif|catlon Listing Schlumberger Alaska Computing Center 7-AUG-~995 ~6:~0 DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 [ 5 66 6 73 7 65 8 68 0.5 9 65 FT ~2 68 ~3 66 ~ ~4 65 FT 15 66 68 0 66 ~ SET TYPE - CHAN ** PAGE: 48 NAME SERV UNIT SERVICE AP1 AP1 APl AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDER ~ LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 506223 00 000 00 e 13 1 [ 4 68 eeeeeeeeee SIGM PS6 CU 506223 ee zee ee e 13 1 1 4 68 eeeeoeeeee TPHI PS6 PU 506223 ee zee ee e 13 1 1 4 68 eeeeeeeeee SBHF PS6 CU 506223 ee zee ee e 13 I I 4 68 eeeeeeeeee SBHN PS6 CU 506223 ee zee ee e 13 1 1 4 68 eeeeeeeeee SIGC PS6 CU 506223 ee zee ee e 13 1 1 4 6S eeeeeeeeee SIBH PS6 CU 506223 ee zee ee e 13 I I 4 68 eeeeeeeeee TEAT PS6 $06223 ee zee ee e 13 I I 4 68 eeeeeeeeee SDS[ PS6 CU 506223 ee zee ee e 13 I I 4 6s eeeeeeeeee FBAC PS6 CPS 506223 ee zee ee e 13 I z 4 68 eeeeeeeeee TCAN PS6 CPS $06223 ee oee 00 e [3 [ I 4 68 eeeeeeeeee TCAF PS6 CPS 506223 00 000 00 0 [3 [ z 4 ss 0000000000 TCND PS6 CPS 506223 ee zee ee 0 13 1 1 4 68 eeeeeeeeee TCFD PS6 CPS 506223 ee zee ee e 13 1 1 4 ss eeeeeeeeee TSCN PS6 CPS 506223 00 eeo ee 0 z3 i 1 4 68 eeeeeeeeee TSCF PS6 CPS 506223 00 zee ee 0 [3 1 1 4 68 eeeeeeeeee INND PS6 CPS 506223 00 zee 00 0 13 1 [ 4 68 eeooeeeeee INFD PS6 CPS 506223 00 zee 00 0 13 1 1 4 68 eeeeeeeeee TENS PS6 LB 506223 ee zee ee e 13 [ 1 4 68 eeeeeeeeee GR PS6 GAPI 506223 00 ee0 00 0 [3 [ 1 4 68 000000oo00 CCL PS6 V 506223 00 zee ee 0 [3 I [ 4 68 eeeeeeeeee LIS Tape Verificat|on L|sting Schlumberger Alaska Comput|ng Center DATA DEPT. 9607.000 SIGM.PS6 SBHN.PS6 81.868 SIGC.PS6 LCO1.PS6 1.638 SDSI.PS6 TCAN.PS6 58075.102 TCAF.PS6 TSCN.PS6 10797.654 TSCF.PS6 TENS.PS6 98e.eee GR.PS6 DEPT. 9332.000 SIGM.PS6 SBHN.PS6 80.863 SIGC.PS6 LCO1.PS6 1.824 SDSI.PS6 TCAN.PS6 26993.504 TCAF.PS6 TSCN.PS6 5499.435 TSCF.PS6 TENS.PS6 1215.eec GR.PS6 7-AUG-1995 16:10 le.389 TPHI.PS6 14.032 o.ee6 SIBH.PS6 115.705 0.144 BACK.PS6 273.566 35464.734 TCND.PS6 23838.758 6593.8e6 INND.PS6 2220.695 163.~00 CCL.PS6 0.035 15.360 TPHI.PS6 0.067 SIBH.PS6 0.271 BACK.PS6 14796.191 TCND.PS6 3014.455 INND.PS6 104.125 CCL.PS6 19.0~1 116.760 275.230 17456.086 2268.905 0.000 SBHF.PS6 TRAT.PS6 FBAC.PS6 TCFD.PS6 INFD.PS6 SBHF.PS6 TEAT.PS6 FBAC.PS6 TCFD.PS6 INFD.PS6 PAGE: 49 59.087 1.370 51.815 11959.045 469.565 62.632 1.410 55.252 7262.896 420.147 END OF DATA **** FILE TRAILER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : 0~1C01 DATE : 95/08/ 7 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 95/08/ 7 ORIGIN : FLIC TAPE NAME : 9~261 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA INC, DS **** REEL TRAILER SERVICE NAME : EDIT DATE : 95/08/ 7 ORIGIN : FLIC REEL NAME : 95261 CONTINUATION # : PREVIOUS REEL COMMENT : ARCO ALASKA INC, DS 15-25, PRUDHOE BAY, 15-25, PRUDHOE BAY, 50-029-21842-~0 50-029-21842-00 COMPANY NAME ' ARCO ALASKA~ INC. WELL NAME : O.S 15-25 FIELO NAME : ~E,BAY STATE : AL ~OROUGH : NOR~ AP! NI~M~ER : 50- 842 NUMBER : LIS TAPE VERIFICATION LISTING 16-AU/G-198B 10:15 PAGE:' SCHLUMBERGER ALASK~ COMPUTING CENTER ~ REEL HE~DER SERVICE NAME : EDIT DATE : 88/08/16 ORIGIN : FLOC REEL NAME : '72865 CONTINUATION ~ : PREVIOUS REEL COMMENT : LIS TAPE, ARCO PRUDHOE BAY, D.S. 15-25, APl ~50-029-218~2 ~ TAPE HEADER '~ ~ SERVICE NAME : EDIT DATE : ~8/08/16 ORIGIN : FLIC TAPE NAME : ?2865 CONTINUATION ~ : 1 PEEVIOUS TAPE : COMMENT : LIS TAPE, ARCO PRUDHOE BAY, D.S. 15-25, API #50-029-21842 ~ FILE H'E~DER FILE NAME : EO!T .001 SERVICE : FLIC VERSION : DATE : 88/08/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST ~ILE : JOB NUMBER AT AKCC: 7~865 RUN ~1, DATE LO~GED: 30-JUL-BB LOP: J. KOHRING DATE COMPUTED: 16-AUG-88 CASING = 7.625" @BgZ4'(LOGGER) TYPE ~LUID = LSNO DENSITY : 8.8 L~/G RM VISCOSITY = ~g.O S ~MF PH = 9.0 RMC FLUID LOSS = 7.5 - BIT SIZE = 6.75~ TO 97)lin(LOGGER) = 4.34 @ 78 Dr: = 5.49 @ 62 DF = Z.72 ~ 72 DF: = 2.072 @ 171 DF FIELD REMARKS: I l/Z" STANDOFF USED ON OIL AND SONIC SONDES; MATRIX DENSITY = SAND HOLE CORRECTION = BIT SIZE; BHS = OPEN HOLE. TOOL TYPES/NUMBERS: DIS 1457 DIC 1308 CNC 1449 SLS 200~ SLC 155 SGC 2479 ~-~ THIS DATA H~S NOT gEEN DEPTH SHIFTEO - OV;ERLAYS FIELD PRINTS LIS TAPE VERIFICATION LISTING 16-AUG-lg88 10:15 PAGE: 2 SCHLUMBERGER ALASKA COMPUTING CENTER SCHLUMBERGER LOGS INCLUDED WITH THIS FILE (EDIT.O01): DUAL INDUCTION SPHERICALLY FOCUSED LOG (.OIL) FIRST TO LAST READING: 9724' TO 89Z4' ~OREHOLE COMPENSATED LOG (.BHC) FIRST TO LAST READING: 9694, TO $924' COMPENSATED NEUTRON LOG (.CNL) FIRST TO LAST READING: 96~6' TO 8924' TABLE TYPE : CONS TUNI CN FN WN NATI STAT CgUN SECT TOWN RANG FL OPER SON APIN APIN V~LU ARCO ALASKA~ INC. g.S. 15-25 U.S.A. AL&SKA NORTH SLOPE 22 1B21' FNL ~ 1414' FWL 530556 50-029-21842 50-029-21842 DEFI COMPANY NAME FIELD NAME WELL NAME N~TION STATE OR PROVINCE COUNTY SECTION TOWNSHIP RANGE FIELD LOC~TIDN OPERATOR'S CODE SERVICE ORDER NUMBER API SERIAL NUMBER API SERIAL NUMBER TABLE TYPE : CU~V OEFI DEPT TENS SFLU ILM ILD SP GR TENS DT GR TENS NPHI TNRA DEPTH CHANNEL NAME TENSION S~L UNAVERAGEO IL-MEDIUM RESISTIVITY IL-DEEP RESISTIVITY SPONTANEOUS POTENTIAL G~MMA R~Y TENSION DELTA-T G~MMA RaY TENSION NEUTRON POROSITY CALIBRATEO THERMAL NEUTRON RATIO LIS TAPE' VERIFICATION LISTING SCHLUMBERGER ~LASKR COMPUTING CENTER' OEFI I6-~UG-1988 10:15 RTNR RAW THERMAL NEUTRON RATIO RCFT RCFT RCNT RCNT CFTC C FTC CNTC CNTC GR GAMMA RR¥ PAGE: 3 ** OATA FORMAT SPECIFICATION RECORD SET TYPE - 64E~ ~ TYPE REPR CODE V~LUE i 66 0 2 66 0 3 73 76 4 66 ! 9 65 VT 13 66 0 14 65 FT 15 66 68 t6 66 1 0 66 O SET TYPE - CHAN NAME SERV UNIT SERVICE ID ORDER ~ API AP1 AP1 ~PI FILE NUMB NUMB SIZE REPR LOG TYPE CLASS MOD NUMB SAMP ELEM CODE PROCESS CHEX) FT 530856 1 1 1 4 6~ 0000000000 18 530856 ! 1 ! SFLU OIL OHMM 530856 1 1 I 4 68 OOOO00OO00 ILM OIL OHMM 530856 1 1 1 4 68 0000000000 IlO OIL OHMM 530856 1 1 1 4 68 0000000000 SP OIL MV 530856 I I 1 4 68 0000000000 GR OIL GAPI 530856 1 I I 4 68 0000000000 TENS BHC LB 530856 1 I 1 4 68 000-0000000 DT BHC US/F:530856 ] I 1 4 68 0000000000 GR BHC GAPI 530856 1 1 1 4 68 0000000000 TENS CNL L~ 530856 1 1 1 4 68 0000000000 NPHI CNL PU 530856 1 1 1 4 68 0000000000 TNRA CNL 530856 1 1 I ~ 68 OOOO000000 RTNR CNL 530856 1 1 ~ 1 4 68 O000OO0000 RCFT CNL CPS 530856 1 1 1 4 68 0000000000 RCNT CNL CPS 530856 1 I ! 4 68 OOOO000000 CFTC CNL CPS 530856 1 I I 4 68 0000000000 LIS TAPE VERIFICATION LISTING I6-~UG~1988 0:'15 PAGE: 4 SCHLUMBERGER ALASKA COMPUTING CENTER NAME SERV UNIT SER¥ICE APl ID OROER LOG CNTC CNL CPS 530856 GR CNL GAPI 530856 TAPI API API FILE NUM SIZE REPR PROCESS YPE CL~.SS MOO NUMB SAM CODE (HEX) 1 I I 4 68 O000OO0000 1 1 1 4 68 0000000000 DATA "~' DEPT. 9759.500 TENS.OIL ILO.OIL 4,585 SP.OIL DT.BHC H3.375 GR.BHC TNRA.CNL 2.216 RTNR.CNE CFTC.CNL 1371.661 CNTC.CNL DEPT. 9700.000 TENS.OIL ILO.OIL 4.098 SP.OIL DT.BHC ~3.563 G~.SHC TNRA.CNL 2.113 RTNR.CNL CFTC.CNL [3~3. Z50 CNTC.CNL DEPT. 9~00o000 TENS.OIL ILO.OIL 64.987 SP.OIL DT.BHC 85.625 GRoBHC TNRA.CNL 2.391 RTNR.CNL CFTC.CNL 1406o167 CNTC.CNL DEPT. 9500.000 TENSoDIL ILO.OIL 159.553 SP.OIL DT.SHC 103.~5 GR.SHC TNRA.CNL 2.595 RTN~.CNL CFTC.CNL 1063.B77 CNTC.CNL DEPT. D400.000 T~NS,DIL ILO.OIL ~10.049 SP.DIL DT.BMC 85,81~ G~.SHC TNRA.CNL 1.931 RTNR.CNL CFTC'CNL 20~B.5~5 CNTC.CNL DEPT. 9~00.000 T~NS.DtL ILO.OIL 175,005 DT.BHC 95.935 GR.SHC TNRA.CNL 2.10B RTN~,CNL CFTC.CNL !577.180 CNTC.CNL DEPT. 9200.000 TENS.OIL ILO.OIL 694,889 5P.DIL DT.BH~ 71.8~3 G~.BHC THRA.CNL 1.Z49 RTNR.CNL CFTCoCNL ~345.807 CNTC.CNL 4152.000 SFLU..DIL 4.966 ILM.DIL -63.125 GR.DIL 119.375 TENS,BHC 119.37.5 TENS.CN[ 4152.000 NPHI.CNL 2.288 RCFI,CNL 1239.062 RCNT.CNL 2996.393 G~CNL 119.375 58'72.000 SFLU-DIL 4.629 !tM,OIL -0.870 GR.~IL 119.375 TENS.BHC 119.375 TENS. CNL 5872.000 NPHI.CNL 2.145 RCF~.CNL 1183.686 RCNT.CNL 2857.625 GR: CNL' 119.375 5420.000 SFLU.DIL 71.741 ILM.DIL -39.781 GR,OIL 5'8.719 TENS.OMC 58.719 TENS.CNL 5420.000 NPHI.CNL 2.401 RCFT.CNL 1227.129 RCNT.CNL 3190.501 GRoCNL 58.719 5632.000 SFLU.DIL 199.162 ILM.D!L --91.625 GR.DIL 20.547 TENS.BHC ~0.547 TENS~CNL 563Z.000 NPHI.CNL 2.651 RCFT.CNL 967.375 RCNT.CNL 27~7-91! GR.CNL 20.547 5604.000 SFLU.DIL 221.423 ILM. DIL -95.313 GR. DIL 19.406 TENS.SHC [9~406 TENS.CNL 5604.000 NPHI.CNL 2.040 RCFT~CNL [927.218 RCNT.CNL 3889.103 GR':.CNL 19.496 54[2.000 175.621 ILM.OIL -56.750 17.578 TEN$.BHC 17.578 TENS~CNL 5412.000 NPHI.CNL 2.2~3 RCFT.CNL 1479.45'9 RCNT.CNL ~272.~99 GR~CNL I7.578 5544.000 SFLU~OIL 2,~5.173 ILM.DIL -102.000 GR~DIL 19.344 TEN$.~HC 19.344 TENS~CNL 5544.000 NPHIoCNL 1.266 RCFT~CNL 3933.709 RCNT.CNL 5522.457 GRaCNL 19.344 4.195 4lSZ.O00 23.960 2877.650 4.153 5872.000 22.420 2765.619 47.439 5'420.0'00 26.557 3039,582 115.300 5632.000 29.654 2649.349 108.461 5604.000 19.685 3714.455 65.232 5412.000 22.352 3003.402 191.930 5544.000 9.457 5554.539 LIS TAPE VERIFICATION LISTING 16-~UG~1988.', 10:15 PAGE: 5 SCHLUMBERGER ALASKA 'COMPUTING CENTER DEPT. 9100.000 TENS.OIL ILO.OIL 90.823 SP.OIL DT.SHC 98.938 GR.BHC TNRA.CNL 2.142 RTNRoCNL CFTC.CML 1471.919 CNTC.CNL 9000~000 TENS.OIL 54.155 SP.DIL g6.813 GR.BMC TNRA.CNL 2.284 RTNR.CN[ CFTC.CNL 1304.542 CNTC.£NL DEPT. 8900.000 TENS.OIL ILO.OIL 10.924 SP.g!L DT.BHC 53.813 GR.BHC TNRA.CNL 2.8B9 RTNR,CNL CFTC.CNL 730.051 CNTCoCNL DEPT. 8851.500 TENS.OiL ILO.OIL 9.~26 SP.OIL DT.BHC !11.563 5R.BHC TNRA.CNL 3.012 RTNR.CNL CFTC.CNL 609.392 CNTC.CNL END OF DATA 54B8.000 SFLB.DIL -68.875 G~.DIL 51.156 TEN .CNL 2.568 RCF~.CNL Z932.91T G~.CNL 5464.000 SFL~.OIL 24.219 G .OIL 37.813 TENS CNL 2.989 RCFIiCNL 1766.484 G~ CNL 861331 41'3'13 5308.000 1336.649 41.313 37.415 51.156 5488.000 1195.914 51.156 ZO00.O00 69.81!3 5544.000 650.518 69.813 2000o000 37.813 5464.000 534.011 37.813 ILM.DIL TENS,,BHC NPHI~CNL RCNT.CNL ILM.DIL TENS.BHC NPH!.CNL RCNT.CNL ILM.DIL TENS.BHC NPHI.CNL RCNT.CNL ILM.DIL TENS,BHC NPHI.CNL RCNT.CNL 48.276 5308.000 22.862 2857.113 30.425 54B8.000 24.979 2706,424 2000.000 55~4.000 34.235 1B87.791 2000.000 5464.000 36.492 1666,253 ~ FIL~ TRAILER ~ FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01A02 DATE : 9B/OB/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : ....-,- -,- -,- -,- T~PE TR~!LER '" '" '" '" SERVICE NAME : ~OIT DATE : 88/05/16 ORIGIN : FLIC TAPE NAME : 72865 CONTINUATION ~ : 1 PREVIOUS TAPE : COMMENT : LIS TAPE, ~RCO PRUgHDE BAY, D.S. 15-Z5, API ~50-029-2184Z LIS TAPE" VERIFICATION LiIS:T~ING 16-AUG-198B ¥10': 15 PATE: SCHLUMBERGER ALASKa, COMPUTING CENTER ..... REEL TRRILER .... * SERVICE NAME : EDIT : 88/08/16 : ~:L ~C : 72865 ~ : COMHENT : LIS TAPE~ ARCO PRUDHOE BAY~ O.S. I5-25~ API ~50-029-21842