Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout190-033ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 January 11, 1999 Ms. Wendy Mahan Alaska Oil & Gas Conservation Commission 3301 Porcupine Drive Anchorage, Alaska 99501-3192 Re: PWDW Well Work Activity Dear Ms. Mahan: Attached is a well work history for each of the ARCO operated Prod~_u. ced_Water Disposal Wells as you requested. If you require additional information or clar~lease contact Bill Mathews at (907) 263-4607. Sincerely, Injection Engineer Attachments RECEIVED JAN 12. 1999 Alaska Oil & Gas Coils. Commission, Anchorage SCANNED DEC ~L 9 2002 ARCO Alaska, Inc. Is a Subsidiary of AtlanticRIchfleldCompany THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE OCTOBER 27, 2000 E E C:LO1CI~MFILM.DOC PL E W M A TE R IA L U N D ER TH IS M A.R K ER ~o- 0'5"5 PWDW1-2 Well has been abandoned. Date 06/11/90 06/11/90 06/20/90 06/29/90 O7/O5/9O 07/12/90 07/18/9O 07/19/90 O7/21/90 O7/22/9O O8/O6/9O Well Event Shot 114' of initial perforations (4130'-4220', 4406'-4430') SBHPS- 1991 psi @ 4400'. Passed 9-5/8" MIT. Ran baseline TEMP. Indicated a channel up which allowed water to travel around 13-3/8" shoe to surface. Attempted remedial squeeze, but only able to leave cement plug with top @ 4075'. 13-3/8" injectivity test of 0.9 BPM @ 2000 psi. 13-3/8" injectivity test of 2 BPM @ 3000 psi. Placed cement plug @ 4000'CTM. TEMP and 13-3/8" injectivity test of 0.78 BPM @3000 psi. Tubing injectivity test of 2 BPM @ 1500 psi. Well abandoned. PLUGGIN"~ ~& LOCATION CLEAi_~/NCE REPORT State of Alaska .ALASKA OIL & GAS CONSERVATION COHMISSION .. Memcrand'~.m To File: Zbnd Date ~ ' Comp!etad ~ ' /b Note casing size, wt, depth, cmt vol, & orocedure. Review the well file, and' comment on plugging, well head sUatus, s~d location clearance - orovide loc. clear, code. Harker ~os= or Location Clear~c~: Code Signed Date · · STATE OF ALASKA ALA~,,''~ OIL AND GAS CONSERVATION OCr, ..... 3SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ",- '¥ 1 Status of Well Classification of Service Well , OIL r'~ GAS r'-] SUSPENDED r-'] ABANDONED r~] SERVICE [~ / 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 90-33 3 Address 8 APl Number P.O. Box 100360, Anchorage, AK 99510-0360 50-029-22024 4 Location of well at surface 9 Unit or Lease Name 761' ESL, 252' FWL, SEC 31, TllN, R15E UM PRUDHOE BAY UNIT At Top Producing Interval r~o.~~ ~t~.~..~_~;:~ ~ 10 Well Number 728' FSL, 261' FWL, SEC 31, TllN, R15E UM J iiS~f PWDW1-2 At Tota, Depthi,,,,,,~-~~~' .~..~:~ 11 F'ie,dandP~o,  CRETACEOUS/UNDEFINED 730'FSL, 259'FWL, SEC 31, T11N, R15E UM i !'rial 5 Elevation in feet (indicate KB, DF, etc.) 6 Lease !~_-~- _ _' No. RKB 62' ADL 28326 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. 15 Water Deplh, if offshore 116 No. of Completions 03/18/90. 03/25/90. Oa,/.L-q9/9~ N/A feet U SLI 1 17 Total Deplfl (MD+'FVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey J20 Depth where SSSV set'1 21 Thickness of permafrost 6005' MD/TVD 3474' MD/TVD YES ~ NO r'-II 2223, feet MDJ 1900' (approx) . 22 Type Electric or Other Logs Run GR/CAL, CCL, CET/CBT, GCT 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo]roM HOLE SIZE CEMENTING RECORD AMOUNT PULLED ,,, 20" 91.5# H-40 SURF 112' 30" 2850# POLESET 13-3/8" 68.0# K-55/L-80 SURF 3467' 17-1/2" 2000 SX CS Ill & 600 SX CLASS G TOP JOB W/250 SX CS II , 9-5/8" 47.0# L-80 SURF 5988' 12-1/4" 300 SX CLASS G 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7" 3263' 3200' NONE OPEN TO PRODUCTION , 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) .. AMOUNT & KIND OF MATERIAL USED __ 4448'-4450' (8/90 10-407 RPT) 750 SX CLASS G & 24 BBL MSR-100 ACID PERES F/4136'-4434' 143 BBLS CMT (7/6/90**) ,PLUG F/3474'-4040' 79 BBLS THIXOTROPIC CMT !RET @ 3067' (SQZ CSG HOLE) 200 SX CLASS G 27 N/A. PRODUCTION TEST PLUG F/4000'-4130' 24.5 BBLS CLASS G (7/19/90'*) Date First Production IMethod of Operation (Flowing. gas lift, etc.) I ,,, Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OiL RATIO I TEST PERIOD -- Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE .~ Brief description of lithology, porosity, fractures, appe'rent dips and presence of oil, gas or water. Submit core chips. NONE ~ ~','" "' ' :' *NOTE: DRILLED RR 3/29/90. TUBING RUN 6/9/90. PERFORATED WELL 6/10/90. CTU SQUEEZE & PLUG PERFORMED 7/6/§0 & 7/19/90. PLUG & ABANDONED WELL 8/29/90. ** DETAILS TO BE SUBMITTED BY OPERATIONS WITH FORM 10-404 (REPORT OF SUNDRY WELL OPERATIONS). Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE , , 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure dal:a, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. UGNU SAND 5525' 5525' UGNU C 5525'-5907' 5525'-5907' UGNU B 5907'-5994' 5907,-5994' NONE WEST SAK 5994' 5994' : : ? · ,, 31. LIST OF A'I:TACHMENTS P & A WELL HISTORY 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ..~:) ~ (~,~/~ J Title DRILLING ANALYST Date /~)' ~' ~ Signed // INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO Oil and Gas Company Well History- Initial Report - Daily Instructions: Prepare and submit the "Initial RelX)l'l" o~1 the first Wednesday after a well ia spudded or workover operations are started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District ARCO ALASKA !NC. PRUDHOE BAY Field , AS3846 Auth. or W.O. no. JCounty. parish or borough ANT,; 28326 Lease or Unit Title W~U'~..I~ - PL'3~ APT: 50-029-2202~ State A~ Operator ARCO ACCEPT Spudded or W.O. begun Date and depth as of 8:00 a.m. 08/07/90 ( TD: 0 PB: 5893 SUPV: DCS/MD 08/08/90 TD: 0 PB: 5893 SUPV:MDD 08/09/90 ( TD: 0 PB: 5893 SUPV:MDD 08/10/90 ( TD: 0 PB: 5893 SUPV:TJ .08/11/90 ( TD: 0 SUPV:DAC The above is co~'rect~, For form prep~aratlon and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. ARCO W.I. IHour v,.~,.~,,~ .,']..,-t,,~ ~Prior status if a W.O. I 21.7800 Date NABORS ~ES Complete record for each day reported 2) 3) N/D .T~:~ 9-5/~,,e 59~, :-~; O.O N~Cl MOVE RIG F/ DS 11-28 TO PWDW 1-2. ACCEPT RIG @ 03:30 HRS 8/7/90. PULL BPV. OBSERVE WELL, TBG & CSG PRESS - 0 PSI. RESET BPV. N/D TREE. DAILY:S106,005 CUM:$106,005 ETD:S106,005 EFC:$1,207,000 CHANGING RAMS 9-5/8"@ 5988' MW: 9.1NaC1 N/D TREE. TEST 9-5/8" PACKOFF TO 3800 PSI & 13-3/8" WELD TO 1500 PSI. N/U BOP. INSTALL 7" RAMS. PULL BPV. TEST BOP. R/U WESTERN ATLAS, PERFORATE TBG @ 3119' - 3121.5', R/D E-LINE. M/U LDG JT. CIRC 9.1 PPG NACL AROUND. BOLDS, PULL TBG FREE, L/D HGR. POOH & L/D 79 JTS 7" TBG, SSSV & SEALS. CLEAR RIG FLOOR. CHANGE RAMS TO 6" - 3-1/2" VARIABLE RAMS & TEST SAME. DAILY:S52,643 CUM:$158,648 ETD:S158,648 EFC:$1,207,000 RIH W/ MILL 9-5/8"@ 5988' MW: 9.1NaC1 FIN TESTING VARIABLE RAMS. INSTALL WEAR RING. M/U BHA #1 (MILL & PRT). RIH, SLIP & CUT, RIH. TAG PKR @ 3198' MILL PKR TO 3200'. PULL PKR TO 3196', PKR STUCK, PRT PULLED OUT OF PKR. POOH, L/D PKR & PRT, LOST (1) GRAPPLE IN HOLE. RIH W/ BHA #2 (SPEAR). ENGAGE PKR & JAR FREE. POOH. L/D PKR & TAIL PIPE ASSEMBLY, DID NOT RECOVER LOST GRAPPLE. M/U BHA #3 (MILL). RIH. DAILY:S44,005 CUM:$202,653 ETD:S202,653 EFC:$1,207,000 VISCOSIFYING FLUID 9-5/8"@ 5988' MW: 8.9 NaCl RIH W/ MILL. TAG FILL / JUNK @ 3923'. MILL TO 3926', LOSING FLUID @ 72 BBL/HR. CUT FLUID WT TO 9.0 PPG, LOSING FLUID @ 60 BBL/HR, CUT FLUID WT TO 8.9 PPG, NO CHANGE IN FLUID LOSS. CLEAN OUT TO 3941', FOUND CSG IS PARTED @ 3931'. CIRC & COND, LOSING FLUID @ 60 B~/HR,~ERED SAND IN CUTTINGS. COULD NOT WORK MILL BACK PAST 3931' POOH. RIH W/ TAPER MILL. TAG @ 3927'. WORK THRU PARTED CSG. CLEAN OUT CMT & SAND TO 4110'. PUMP 50 BBL HEC PILL. CIRC & COND. BLED SURFACE CSG F/ 1850 TO 0 PSI. ATTEMPT TO POOH, WELL U-TUBING. CIRC & COND, VISCOSIFYING WORKOVER FLUID. DAILY:S23,265 CUM:$225,918 ETD:S225,918 EFC:$1,207,000 RIH W/ STRING REAMER 9-5/8"@ 5988' MW: 8.9 NaCl PUMPED 50 BBL HEC PILL, CHASED W/ VISCOSIFIED FLUID. PULL 2 STDS, HOLE TAKING FLUID. MONITOR t~EI.L & MiX "LIQ?ID C~" LCM PILL. SPOT 53 BBL LIQUID CSG, LOSS RATE REDUCED. RIH, TAG FILL @ 4040', CIRC ~ BPM, LOSING I BPM. POOH. P/U STRING MILL & RIH. REAM TIGHT SPOTS @ 3399' & 3481'. PUMPING 2 BPM, LOSING I BPM. DAILY:S156,374 CUM:$382,292 ETD:S250,000 EFC:$1,339,292 AR3B-459-1-D INumber ail dally well history forms consecutively aa they are prepared for each well. iPage no. ARCO Oil and Gas Company ~, Daily Well History--Interim Instructions: This form iS used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion. State NORTH SLO?~. AK IWell no. District County or Parish ARCO ALASKA INC. Field Lease or Unit PRUDHOE BAY PWDW 1-2 Date and depth Complete record for each day while drilling or workover in progress as of 8:00 a.m. NABORS 2ES 6) 08/12/90 ( TD: 0 PB: 5893 SUPV:DAC 08/13/90 ( TD: 0 PB: 5893 SUPV:DAC 08/14/90 ( TD: 0 PB: 5893 SUPV:GTG 08/15/90 ( TD: 0 PB: 5893 SUPV:GTG/MI 08/16/90 ( TD: 0 PB: 5893 SUPV:GTG/M[ 8) 9) 10) POOH 9-5/8"@ 5988' MW: 8.9 NaC1 REAM THRU PARTED CSG @ 3927'. POOH, LOST 42 BBLS FLUID. RIH W/ EZSV TO 4042' ATTEMPT TO SET, NO SUCCESS. POOH, EZSV APPEARED TO HAVE GONE INTO OPEN HOLE. RIH W/ TAPER MILL TO 4118', HOLE VERY STICKY, MILL APPEARS TO HAVE GONE INTO OPEN HOLE. POOH TO 3900'. AT.TEMPT TO ESTABLISH CIRC BETWEEN THE 13-3/8" X 9-5/8" ANNULUS, PRESSURE TO 1100 PSI W/ 3 BBLS. POOH, WELL SWABBING, WORK PIPE, POOH, LOST 147 BBLS. RIH W/ RETRIEVABLE BRIDGE PLUG & SET @ 3788'. TEST CSG TO 2500 PSI, OK. POOH. DAILY:S26,452 CUM:$408,744 ETD:S250,000 EFC:$1,365,744 L/D 9-5/8" LDG JT 9-5/8"@ 5988' MW: 8.9 WBM POOH. N/D BOPS & TBG HEAD. N/U DRLG SPOOL & BOPS. TEST BOPS. RIH W/ RBP OVERSHOT TO 3782'. DISPLACE WELL TO 8.9 PPG WATER BASE MUD. INSTALL 9-5/8" RAMS. & TEST BONNET SEALS. ENGAGE & RELEASE RBP. POOH. ATTEMPT TO PUMP DOWN 13-3/8" X 9-5/8" ANNULUS, PRESSURED UP TO 2500 PSI, NO SUCCESS. BOLDS. M/U 9-5/8" LDG JT. ATTEMPT TO PULL 9-5/8" CSG, PULLED UP TO 400K#. STRETCH CALCS SHOW CSG IS STUCK @ 3120'-3220'. L/D LDG JT. DAILY:S30,674 CUM:$439,418 ETD:S250,000 EFC:$1,396,418 POOH W/ SPEAR 9-5/8"@ 5988' MW: 8.9 WBM RIH W/ 9-5/8" CSG CUTTER. CUT CSG @ 3088' POOH. M/U LDG JT. PULLED & L/D 9-5/8" CSG RECOVERED 72 JTS & 24' STUB. RIH W/ SPEAR & CSG CUTTER. CUT 9-5/8" CSG @ 3249'. ATTEMPT TO PULL CSG, NO SUCCESS. RELEASED SPEAR. POOH. DAILY:S31,618 CUM:$471,036 ETD:S250,000 EFC:$1,428,036 RIH W/ SPEAR 9-5/8"@ 5988' MW: 8.9 WBM L/D CSG CUTTER & SPEAR. M/U 150' OF WASHPIPE & RIH. WASH OVER 9-5/8" F/ 3088' - 3228' CBU. POOH. STAND BACK WASHPIPE. CHANGE OUT KELLY. RIH W/ SPEAR & CSG CUTTER. DAILY:S26,257 CUM:$497,293 ETD:S250,000 EFC:$1,454,293 WASHING OVER 9-5/8" 9-5/8"@ 5988' MW: 8.9 WBM RIH W/ SPEAR & CUTTER. ENGAGE SPEAR. JAR ON CSG, NO MOVEMENT. CUT CSG @ 3219' (40' ABOVE PREVIOUS CUT). ENGAGE SPEAR & PULL CSG FREE. POOH, RECOVERED (2) FULL JTS & CUT JTS. RIH W/ WASHPIPE. TAGGED TIGHT SPOT @ 3109' & REAM THRU. TAGGED 9-5/8" @ 3219'. WASHING OVER 9-5/8" DAILY:$27,$77 CUM:$524,870 ETD:S250,000 EFC:$1,481,970 ITitle see Procedures Manual Section 10, Drilling, Pages 86 and 87 AR3B-459-2-B Number all daily well hi~It6~r~'IO~'~ 'Cori~cuIively as they are prepared or each well. IPage no. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2} on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion. District JCounty or Parish IState ARCO ALASKA INC. NORTH SLOPE Field ILease or Unit PRUDHOE BAY I PWDW 1-2 Complete record for each day while drilling or workover in progress NABORS 2ES Date and deptil as of 8:00 a.m. 08/17/90 ( TD: 0 PB: 5893 SUPV:GTG/~ 08/18/90 ( TD: 0 PB: 5893 SUPV:GTG/MI 08/19/90 ( TD: 0 PB: 5893 SUPV:GTG/M/ 08/20/90 ( TD: 0 PB: 5893 SUPV:GTG/MJ2 08/21/90 ( TD: 0 PB: 5893 SUPV:GTG/M~ 08/22/90 ( TD: 0 PB: 5893 SUPV:GTG/MI 11) 12) 13) 14) 15) 16) AK IWell no. WASHING OVER 9-5/8" 9-5/8"@ 5988' MW: 8.9 WBM WASH OVER 9-5/8" TO 3279' C&C MUD. POOH. STAND BACK WASH PIPE. RIH W/ SPEAR. ENGAGE FISH. POOH W/ FISH. RIH W/ WASH PIPE. TAG 9-5/8" @ 3259'. WASH OVER 9-5/8" CSG. DAILY:S36,263 CUM:$561,133 ETD:S561,133 EFC:$1,207,000 POOH 9-5/8"@ 5988' MW: 8.9 WBM WASH OVER 9-5/8" TO 3346'. CIRC & COND. POOH. RIH W/ CUTTER & SPEAR. SET SPEAR & ATTEMPT TO JAR CSG FREE, NO SUCCESS. CUT CSG @ 3334'. ENGAGE SPEAR. ATTEMPT TO PULL CSG FREE, NO SUCCESS. POOH FOR NEW SPEAR & CUTTER. DAILY:S27,151 CUM:$588,284 ETD:S588,284 EFC:$1,207,000 P/U MILL 9-5/8"@ 5988' MW: 8.9 WBM L/D CUTTER & SPEAR. RIH W/ NEW SPEAR. ENGAGE 9-5/8" CSG, PULLED CSG STUB FREE. POOH & L/D 77' OF CSG. RIH W/ WASH PIPE. WASH OVER CSG F/ 3345' - 3350', HIGH TORQUE ENCOUNTERED. POOH. L/D WASH PIPE. P/U METAL MUNCHER MILL. DAILY:S22,143 CUM:$610,427 ETD:S610,427 EFC:$1,207,000 CLEANING OUT FLOW LINE 9-5/8"@ 5988' MW: 8.9 WBM P/U METAL MUNCHER BHA. RIH. SERVICE RIG, HELD BOP DRILL & SAFETY MTG. CIRC & COND MUD. MILL ON 9-5/8" CSG F/ 3336' - 3380' CLEAN OUT METAL SHAVINGS IN FLOWLINE. MILL 9-5/8" CSG F/ 3380' - 3410'. CLEAN OUT FLOWLINE. DAILY:S26,752 CUM:$637,179 ETD:S637,179 EFC:$1,207,000 TESTING BOP 9-5/8"@ 5988' MW: 8.9 WBM MILL 9-5/8" CSG TO 3440'. CIRC & COND. POOH. MILL HUNG UP IN WELLHEAD, WORK MILL TO FLOOR. L/D MILL. WASH METAL SHAVINGS OUT WELLHEAD & BOP. CHANGE LOWER RAMS TO VARIABLES. TEST BOP. DAILY:S24,725 CUM:$661,904 ETD:S661,904 EFC:$1,207,000 CIRC @ 1392' 9-5/8"@ 5988' MW: 8.9 WBM TEST BOPS, HAD DIFFICULTY WITH TEST PLUG. RIH W/ METAL MUNCHER MILL TO 3440'. ATTEMPT TO CIRC, DRILL PIPE PLUGGED. POOH & CLEAN OUT METAL SHAVINGS IN BHA. RIH, DRILL PIPE PARTIALLY PLUGGED. WORK PIPE AND CLEARED PIPE. CIRC TO CLEAN HOLE. POOH TO WIPE CSG CLEAN. RIH TO 1392', DRILL PIPE PARTIALLY PLUGGED. CIRC TO CLEAN HOLE. DAILY:S24,047 CUM:$68~,951 ETD:S685,951 EFC:$1,207,000 The above is correct see Procedures Manual Section 10, Drilling, Pages 86 and 87 I~~ c~"0 IT't'e Drilling Supt. AR3B-459-2-B INumber all dally well history forms consecutively as they are prepared for each well. lPage no. ARCO Oil anei Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1} Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion. District ARCO A~J~SY~- INC. Icounty or Parish NORTH SLOPE I Field PRUDHOE BAY JLease or Unit PWDW 1-2 I Date and depth Complet ...... d f .... r_~]~/(j~e d~i~g ..... k .... in prog .... as of 8:00 a.m. 08/23/90 (17) TD: 0 PS: 5893 SUPV: HMP/M/)D Istale AK JWell no. 08/24/90 ( TD: 0 PS: 5893 SUPV:HMP 08/25/9O ( TD: 0 PB: 5893 SUPV:HMP 08/26/90 ( TD: 0 PB: 3447 SUPV:HMP 08/27/90 ( TD: 0 PB: 3447 SUPV:HMP 08/28/90 ( TD: 0 PS: 3067 SUPV:HMP 18) The above is correct For form preparation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 MILLING ON 9 5/8 CSG. 9-5/8"@ 5988' MW: 8.8 WBM ATTEMPT TO UNPLUG DRILL PIPE, NO SUCCESS. POOH. RIH W/ 12-1/4" BIT. CIRC & COND MUD. POOH. RIH W/ MILL. DRILL PIPE PLUGGED AT 11 STDS IN. POOH & UNPLUG DRILL COLLARS. RIH W/ MILL. CIRC & COND @ 9-5/8" STUB. MILL 9-5/8" CASING F/ 3440' - 3455' DAILY:S25,715 CUM:$711,666 ETD:S711,666 EFC:$1,918,766 19) MILLING 9-5/8" CSG 9-5/8"@ 5988' MW: 8.8 WBM MILL 9-5/8" CSG TO 3497'. PUMP 200 BBL LCM PILL TO REDUCE FLUID LOSS. CIRC & CLEAN HOLE OF METAL SHAVINGS. MILL 9-5/8" TO 3577'. DAILY:S28,588 CUM:$740,254 ETD:S740,254 EFC:$1,207,000 20) RIH LOOKING FOR TOP CMT. PLUG 9-5/8"@ 5988' MW: 8.8 WBM MILL 9-5/8" CSG TO 3592' CIRC & CLEAN HOLE. POOH, HOLE SWABBING, RIH. CIRC HOLE CLEAN. POOH. L/D BHA. RIH W/ 5" DRILL PIPE & 3-1/2" STINGER TO 4040' R/U CMT LINES. SPOT 79 BBL CMT PLUG, THIXOTROPIC CMT. POOH. RIH W/ 12-1/4" BIT TO TAG CMT. ESTIMATED TOC @ 3257', ACTUAL TOC @ 3463' DAILY:S154,498 CUM:$894,752 ETD:S894,752 EFC:$2,101,852 21) CIRC. HOLE CLEAN TO TEST CSG. 9-5/8"@ 5988' MW: 8.7 WBM DRILL CMT TO 3592' C&C. POOH. RIH W/ 3-1/2" STINGER, DP PLUGGED. POOH, CLEARED DP. RIH. SPOT 200 SX (38 BBLS) CL 'G' CMT W/ CACL @ 16.5 PPG. POOH. HELD H2S DRILL. RIH W/ BIT, TAG CMT @ 3388'. WASH CMT TO 3427'. WOC. DRILL CMT TO 3447'. C&C PRIOR TO TSTG 13-3/8" CSG. DAILY:S60,286 CUM:$955,038 ETD:S955,038 EFC:$2,162,138 22) MIXING CMT. 9-5/8"@ 5988' MW: 8.8 WBM C&C MUD. ATTEMPT TO TEST 13-3/8" CSG TO 2500 PSI, CSG LEAKED @ 500 PSI & 4 BPM. POOH. RIH W/ RTTS. ATTEMPT TO SET RTTS @ 1147', WOULD NOT SET. POOH. CLEAN METAL SHAVINGS .~ F/ RTTS. RIH W/ RTTS. SET RTTS @ 3385', CSG DID NOT TEST. ~,~ SET RTTS @ 3130', CSG DID NOT TEST, SET TOOL @ 3100'. TEST~"~? CSG F/ SURF TO 3100' TO 2500 PSI, OK. POOH. RIH W/ CMT "~ RETAINER AND SET @ 3067'. R/U DOWELL TO PERFORM 200 SX CMT SQUEEZE, MIXING CMT. DAILY:S23,539 CUM:$978,577 ETD:S978,577 EFC:$1,207,100 NU BOPE 9-5/8"@ 5988' MW: 8.8 WBM MIX & PUMP 200 SX CL 'G' W/ 2% S-1 @ 15.8 PPG. SQUEEZED CMT THRU RETAINER. FINAL SQUEEZE PRESSURE - 1100 PSI, 28 BBL CMT INTO FORMATION. UNSTING F/ RETAINER, ATTEMPT TO REVERSE OUT, DRILL PIPE PLUGGED. CIRC LONG WAY. POOH. P/U 2 STDS, M/U RTTS. SET RTTS @ 34'. N/D BOP. INSPECT CSG HEAD, ~F~ ~N~GE~.. ~EM~VF CSG HEAD, WELD ON ADAPTER SWAGE, $~REW ON NEW CSG HEAD. N/U SOPS & DRLG SPOOL. DAILY: $3~/~51 \ CUM: $1, ~t~,828 ETD: $1, 010,82~ EFC: $1,207,000 ~\ ~.\ ~ ~ / Ddllina Suet. AR3B-459-2-B INumber all daily well history [orms consecutively as they are prepared for each well. IPage no. ARCO Oil and Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number aH drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1} Submit "Interim" sheets when filled out but nol less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion. District ARCO ALASKA INC. Icounty or Parish NORTH SLOPE IState I I Field PRUDHOE BAY ILease or Unit PWDW 1-2 I Complet ...... d f .... ~t,d~b~e ~,;~..~g ..... k .... in prog .... Date and depth as of 8:00 a.m. 08/29/90 ( TD: 0 PB: 3067 SUPV:HMP AK JWell no. 23) DRILLING CMT. RET. 9-5/8"@ 5988' MW: 8.7 WBM FIN N/U BOP. TEST CSG HEAD TO 2000 PSI, TEST BOPS. ENGAGE RTTS @ 34'. RELEASE & L/D RTTS. SET WEAR BUSHING. M/U 12-1/4" BIT & BHA. RIH. SLIP & CUT DRILL LINE. FIN RIH. DRILL ON CMT RETAINER F/ 3064' - 3067'. DAILY:S58,038 CUM:$1,068,866 ETD:S1,068,866 EFC:$1,207,000 The above is correct For form~'prep~ration and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 ]T,t,e Ddlling Supt. AR3B-459-2-B INumber all daily well history forms consecutively IPage no. as they are prepared for each well. I ARCO Oi, =nd Gas Company Daily Well History-Final Report Instructions: Prepare and submit the,"F[~.:l~lT' on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be eubmil;~_~~.l~_r&flOns Ere luepended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, repo~Co~~'el~reeentatlve test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. ~-~!L ' ~~ ~ ' : Accounting cost center code ICounty or Parish District ARCO A~-~,S~'~3~. TNC. NO]:~,TH SLOP]~ ILease or Unit Field PRUDHOE BAY ADL: 28326 Auth. orW.O, nOAs3846 ITM WORKOVER - PLUG & ABANDON API: 50-029-22024 State AK Operator ARCO Spudded or W.O. begun ACCEPT A.R.Co. W.I. Date 21.7800 I otal number of wells (active or inactive) on this ost center prior to plugging and bandonment of this well I our 0330 HRS IPrlor status if a W.O. I 8/7/90 Date and depth as of 8:00 a.m. Complete record for each day reoorted NABORS 2ES 08/30/90 (!4) TD: 0 PB: 3474 SUPV:GTG RIG RELEASED 9-5/8"@ 5988' MW: 8.7 WBM DRILL CMT F/ 3072' - 3122'. RIH & TAG CMT PLUG @ 3444' CLEAN OUT TO 3454' & TEST CASING SQUEEZE TO 10.5 PPG EMW. GOOD. DRILL CMT F/ 3454' - 3474'. PUMP SWEEP. POOH. LD BHA. RELEASE RIG @ 1800 HRS, 8/29/90. BEGIN SIDETRACK OPERATIONS (PWDW 1-2A). DAILY:S12,923 CUM:$1,081,789 ETD:S1,081,789 EFC:$2,288,889 Old TD Released rig Date Classifications (oil, gas, etc.) IPB Depth Kind of rig Type completion (single, dual, etc.) Producing method Official reservoir name(s) Potential test data Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct ~, For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C Number all daily well history forms consecutively as they are prepared for each well. iPage no. DIvlMon of AtlintlcRIchfleldCompa~y I TELECO '~e~o oi.ie~ s~ , Inc, oomme~ 6116 N~elson way i Anchorage, AK 9951 $ (907) 562-2646 April 12, 1990 -33 JOB #75I' ARCO ALASKA, INC. WELL: PWDW 1-2 PRUDHOE BAY RIG: NABORS 28-E Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to ARCO Alaska Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Jonathan G. Mapes Field OperatiOns Supervisor JGM/el Enclosures RECEIVED ICItOFILMED / APR 2 G 1990 Oil & 6ii ~orm. ~omml~sloP A _q~JdAT C(%~A PA I',JY Company: ARCO ALASKA, Well: PWDW 1-2, Location: PRUDHOE BAY, Riq: NABORS 28E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg .feet feet feet feet feet deg deg/lO0' 1264 243 0.4 85.2 1264.00 -1.13 1.13S 1.78E 2.11 S 57.43E 0.06 1590 326 0.6 161.5 1589.99 -2.66 2.66S 3.45E 4.36 S 52.40E 0.20 1858 268 0.7 140.4 1857.97 -5.25 5.25S 4.94E 7.21 S 43.26E 0.10 2176 318 0.7 148.1 2175.95 -8.40 8.40S 7.21E 11.06 S 40.63E 0.03 2490 314 0.9 198.4 2489.92 -12.36 12.36S 7.44E 14.43 S 31.04E 0.22 2941 451 1.5 167.5 2940.83 -21.49 21.49S 7.60E 22.79 S 19.48E 0.19 3445 504 0.7 164.6 3444.73 -30.90 30.90S 9.85E 32.43 S 17.67E 0.16 3780 335 0.6 170.3 3779.71 -34.60 34.60S 10.68E 36.21 S 17.16E 0.04 4288 508 0.5 194.2 4287.68 -39.37 39.37S 10.59E 40.77 S 15.05E 0.05 4731 443 0.2 178.7 4730.68 -42.02 42.02S 10.13E 43.22 S 13.56E 0.07 5264 533 0.5 334.1 5263.67 -40.85 40.85S 9.14E 41.86 S 12.61E 0.13 5483 219 0.5 312.0 5482.66 -39.36 39.36S 8.01E 40.16 S 11.50E 0.09 5955 472 0.4 341.1 5954.65 -36.42 36.42S 5.95E 36.90 S 9.27E 0.05 PAGE 2 'I-E"~'~CO OJ. 1 ~ J.e -Icl PLAN VIE~ Ser"v ic lO0 2490 ~1445 ARCO ALASKA PWDW 1-2 PRUDHOE BAY NABORS 2BE JOB# 751TAK/O0 SCALE: 1 inch = 50 feet 50 50 100 150 20O a50 300 350 CO 5O 50 EAST (ft) lO0 150 2OO ORIGINAL SUB.$URFACE DIRECTIONAL $URVEY [~[] UIDANCE [~ONTINUOUS ~____..]OOL Company , Well Name Field/Location, ARCO ALASKA, INC. I PWDW1-2(761' FSL,252' FWL,SEC 31,TllN,R15E,UM) PRUDHOE BAY, NORTH SLOPE, ALASKA Il il I I II Job Reference No. 73895 Loaaed By: MCBRIDE Date .... ~J h 7-APR-90 ~a/la__/,0/a.7~/,~o ~ KOHRING GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKAt INC. PWDW 1-7. PRUDHOE BaY NORTH SLOPE, ALASKA SURVEY DATE: 07-APR-1990 ENGINEER: MCBRIDE METHODS OF CO#PUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZI#UTH OF NORTH 0 DEG 0 MIN EAST COMPUTATION DATE: 9-JUN'90 PAGE I ARCO ALASKA, [NC. PHDN 1-2 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: O/-APR-199Q KELLY BUSHING ELEVATION:: 62~00 FT ENGINEER:' MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF HEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH OEPTH OEPTH DEPTH OEG MIN DEG MIN 0.00 0.00 -62°00 100.00 100.00 38.00 200.00 ZO0.O0 138.00 300.00 300.00 238.00 400.00 400.00 338°00 500.00 500.00 438.00 600.00 600.00 538.00 700.00 700.00 638.00 800000 800°00 738.00 900.00 900.00 838000 VERTICAL DOGLEG RECTANGULAR! COORDINATES HORIZ.:DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/NEST DIST. AZ[MU:TH FEET OEG/IO0 FEET 0 0 N 0 0 E '0.00 0.00 0 :7 S 40 55 bi i -0.10 0.82 0 5 N 9 12 E -0.18 0.83 0 9 : S 68 52 bi -0.25 0.65 0 7 S 20 47 id -0.41 0.59 0 4 S 25 22 bi -0.53 0.46 0 5 N 13 25 E -0.60 0.53 0 4 N 51 1'1 E -0.63 0.37 0 5 S 61 37 E -0.65 0045 0 8 S 35 23 Id -0.62 0°50 FEET FEET DEG WIN O. O0 M O. O0 E 0.10 S 0ol0 W 0.18 S 0.23 W 0.25 S 0.37 N 0.41 S 0.52 id 0.53 S 0.64 N 0.60 S 0.72 Id 0.63 S 0.79 W 0.65 S 0.86 M 0.62 S 0.91 0.00 N 0 0 E 0.14 '~S 46 17 id 0.29 S 52 54 Id 0.44 S 56 16 Id 0.66 .S 52 15 M · 0.83 S 50 33 bi 0.94 S 50 21 1.01 1.08 S 53 0 1.10 S 55 31' M 1000.00 1000.00 938°00 0 1100.00 1100000 1038.00 0 14 1200.00 1200.00 1138.00 0 17 1300o00 1300.00 1238.00 0 22 1~00'00 1399.99 1337.99 : 0 27 1500.00 1499o99' 1437.99 0 25 1600.00 1599.99 1537,,99 0 26 1700000 t699.99 1637.99 0 29 1800'00 1799.98 1737.98 0 4,0 1900.00 1899.97 1837.91' 0 39 S 10 41 E -0.73 0.39 0.73 S S 77 0 E -0.99 0.33 0.99 S S 83 I E -1.18 0.48 1.18 S S 74, 45 E -1.34 O.4& 1.34 S S 64 8 E -1.55 0.29 1.55 S S 54 59 E -1,83 0.54 1.83 S S 48 52 E -2.22 0.63 ZoZZ S S 50 9 E -2.84 0.22 2.84 S S 4,2 12 E -3.58 0.49 3.58 S S 31 32 E -4.37 0.68 4o31' S 0.84 W : 1.11 S 49 1 W 0.65 W 0.25 bi 0.24 E O. 80 E 1.41 E 2.06 E 2.75 E 3.37 E 4.02 E 1.18 S 33 9 w 1.21 S 11 47 ltl 1.36 S 10 3 E 1.T5 S 27 10 E 2.31 S 37 40 E 3.03 S 42 .59 E 3.95' S 44 6 E 4.92 S 43 20 E 5.94 S 42 37 E 2000.00 1999.97 1937.97 2100.00 2099.96 2037.96 2ZO0.O0 2199.96 2137.96 2300.00 2299.95 2237.95 2400000 2399.95 2337.95 2500000 2499.94 2437.94 2600.00 2599.94 253T.94 2700.00 2699.93 2637093 2800.00 2799.92 2737.92 2900.00 2899.91 2837.91 0 31 0 30 0 38 0 39 0 37 0 44 0 35 0 39 0 58 0 56 S 29 30 E -5.24 0.50 5.24 S S 34 46 E -6.04 0.21 6.04 S S 31 38 E -6.95 0.41 6095 S S 27 46 E -7.98 0.30 T.98 S S 22 0 E -8.93 0.34 8.93 S S 14 13 E -9.94 0072 9.94 S S 16 52 E -11.00 0.35 11.00 S S 18 48 E -12.17 0000 12.17 S S 17 14 E -13.50 0.15 13050 S S 13 50 E -15.03 0.29 15.03 S 4.66 E 5.17 E 5.74 E 6.24 E 6.60 E 6.96 E 7.37 E 7.71 E 8.06 E 8.49 E 7o01 :S 41 38 E 7.95 $ 40 35 E 9o0~ $ 39 31 E 10.13 S 38 I E 11.10 S 36 30 E 12.14 S 35 0 E 13.24 S 33 49 E 14.40 S 32 Zl E 15.72 S 30 50 E 17.26 S 29 28 E 3000.00 2999.89 2937.89 3100.00 3099.88 3037.88 3200.00 3199.87 3137.87 3300.00 3299.86 3237.86 3400.00 3399.86 3337.86 3500.00 3499.86 3437.86 3600.00 3599.85 3537.85 3700.00 3699.84 3637.84 3800.00 3799.83 '3737083 3900000 3899.82 3837.82 0 55 0 59 0 42 0 25 0 34. 0 42 0 48 0 38 0 41 S 11 43 E -16.64 0.31 S 7 10 E -18.27 0.56 S 0 56 M -19.74 0.51 S 8 52 E -20.70 0.38 S 14 5 E -21046 0.45 S 20 I E -22039 O.4T S 18 4.5 E -23.81 0.65 S 9 39 E -25.01 0056 S 18 17 E -26.24. 0.11' S 4. 3 E -27.26 0.53 16.64 18.27 19.74 20.70 21.46 22.39 23.81 25.01 26.24 IT. 26 8.91 E 9.13 E 9.23 E 9.20 E 9.27 E 9.69 E 10.05 E 10.38 E 10.72 E 10.93 E 18.88 S 28 10 E 20.42 S 26 33 E 21.79 S 25 3 E 22.66 S 23 57 E 23.37 S 23 22 E 24039 S 23 24, E 25.85 S 22 53 E 27.08 S 22 33 E 28.34 S 22 14 E 29.37 S 21 51 E COMPUTATION DATE.' 9-JUN~90 PAGE" ARCO ALASKA, INC. PWDW 1-2 PRUDHOE BAY NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE HEASURED VERTICAL VERTICAL DEVIATION AZIHUTH DEPTH DEPTH DEPTH DEG HIN DEG NIN DATE OF SURVEY: 07-APR-1990 KELLY BUSHING~ELEVATION:~ 62.00 FT ENGINEER: RCBRXDE · ZNTERPOLATED .VALUES~'FOR EVEN 100 FEET OF ,MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORXZ. DEPARTUR~ SECTION SEVERITY'NORTH/SOUTH EAST/WEST DIST; AZZMUTH FEET DEG/100 FEET 4000.00 3999.82 3937.82 0 32 4100.00 ,099.81 ,037.81 0 32 ,ZO0.O0 4199.81 '137.81 0 25 ,300.00 ,299.81 ,237.81 ~ 0 20 ,400.00 4399.81 ,337.81 ~ 0 32 4500.00 4499.80 4437080 0 20 4600.00 4599.80 4537.80 0 6 4700.00 ,699°80 4637.80 0 19 ,800.00 4799°80 4737.80 0 18 · 900.00 ,899.80 4837.80 0 5 0 19 0 12 0 ZO 0 28 0 36 0 18 0 21 0 19 0 11 0 25 FEET FEET DEG MZN 5000.00 4999.80 4937.80 5100.00 5099.80 5037.80 5200.00 5199.80 5137.80 5300.00 5299.79 5237.79 5400.00 5399°79 5337.79 5500.00 5499°79 5437.79 5600.00 5599°78 5537.78 5700.00 5699.78 5637.78 5800000 5799.78 5737.78 5900.00 5899°77 5837°77 0 25 0 25 S 12 29 E -28.39 O.ZO 28.39 S 11.14. E S 3 14 ~1 -29.25 0.66 29.25 S 11.24 E S 12 ,4 E -30.18 0.39 30.18 S 11.34 E S 3 29 i~ -30.77 0°09 30-77 S 11.39 E S 5 32 ~1 -31.47 0.04 31.,7 S 11.26 E S 8 40 E -32.2, 0.04 32.24 S 11.27 E S 7 2 E -32-65 0.00 32°65 S 11.3, E S 5 2 ~J -32.96 0.66 32.96 S 11.32 E S 8 10 E -33.56 0..41 33.56 S 11.33 E S 0 42 E -33.82 0.21 33.82 S 11.44 E 6000.00 5999.77 5937.77 6005.00 6004°77 5942.77 21 58 W -34.08 0°45 34.08 S 11.28 E 68 37 W -34.4.2 0.54 34.42 S 11'06 E 89 8 W -3,.54 0°49 34.54 S 10.60 E 43 32 W -34.21 0.23 34'21 S 10.04 E 44 4 ~ -33°43 0.50 ' 33.43 $ 9.39 E 44 ,4 # -32.88 0.54 32.88 S 8.81E 35 12 ~ -32.55 0.25 32.55 S 8o61E 50 50 M -32.1, 0.37 32.14 S 8.22 E 36. 8 H -31.86 0:.45 31.86 $ 7.9! E 26 35 M -31.33 0.00 31.33 S 7.61 E Id 26 35 M -30.67 0.00 30.67 S 7.28 E N 26 35 M -30.64 0.00 30.64 S 7.27 E 30.49 S 21 26 E 31.34 S 21 I E 32.24 S 20 36 E 32.82 S 20 19 E 33-43 S 19' 41 E 34'15 S 19 16 E ) 34.56 S 19: 9 E 34.83 S 18 58 E 35.,3 S 18 39 E 35070 S 18 41 E 35.90 S 18 19 E 36.15 S 17 48 E 36.13 S 17:3 E 35-65 S 16 22 E 34.72 S 15 41 E 34.04 S 15 0 E 33.66 S 1, 49 E 33.18 S 14 21 E 32082 S 13 57 E 32.24 S 13 40 E 31o52 S 13 22 E 31.49 S 13 21'E COHPUTATION DATE: 9-JUN-90 P&GE ]* ARCO ALASKAt ']:NC. PMDId 1-2: PRUDHOE BAY NORTH SLOPEr ALASKA.. TRUE SUB-SEA COURSE HEASURED VERTICAL VERTICAL DEVIATION AZINUTH DEPTH DEPTH DEPTH D.EG"RIN DEG DATE OF SURVET: 07-APR-1990 KELLY BUSHING ELEVATION:' 6Z°O:O:FT:'~* ENGINEER: #CBRIDE . INTERPOLATED VALUES;;FOR EVEN'*IO'O0 FEET OF MEASURED DEPTH YERTZCAL DOGLEG RECTANGULAR CDORDINATES~HORIZ. DEP~TURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZXHUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 0 N 0 0 E 0.00 0.00 0.00 0 4 S 10 41 E -0°73 0.39 0.73 0 31 S 29 30 E -5.24 0.50 5°24 0 55 S 11 43 E -16.64 ~ 0.31 16.64 0 32 S 12 29 E -28.39 0.20 28.39 0 19 S 21 58 W -34.08 0.45 34.08 0 25 N 26 35 W -30.67 0.00 30.67 0 25 N 26 35 W -30.64 0.00 30.64 0.00 0.00 -62.00 1000.00 1000.00 938°00 2000.00 1999.97 1937.97 3000.00 2999.89 2937.S9 4000.00 3999.82 3937.82 5000.00 4999.80 4937.80 6000.00 5999.77 5937o7T 6005.00 6004.77 594Z.77 0.00 E 0.00 N 0 0 E 0.84 W 1.11 S'49 1 4.66 E 7.01 S 41 38 E 8.9! E 18.88 S 28 10, E 11.14 E 30.49 S 21 26 E 11.28 E 35.90 S 18 19:E 7.28 E 31.52 S 13 7.27 E 31.49 S 13 21E COMPUTATION DATE: 9-JUN'90 PAGE ARCO ALASKAt INC. PHObi 1-Z PRUDHOE BAY NORTH SLOPEr ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG DATE OF SURVET: "'O7-APR-1990 '! -62. O0 0 0 0.00 :' 0 10 N 0 0 E 0.00 0000 0.00 N 0.00 E S 48 3' M -0.03 0.28 0.03 S 0.06 W 0 lO S 25 55 Id -0.15 0.83 0.15 S 0.24 g 0 5 S 45 14 Id -0.22 0.53 0.22 S 0.31 bi 0 8 S 50 12 bi -0.34 0.60 0.34 S 0.47 bi 0 10 S 40 18 Id -0.47 0-63 0.47 S 0.62 If 0 7 S 3 39 Id -0.58 0.66 0.58 S 0.73 Id 0 7 S 5 41 Id -0.61 0.64 0.61 S 0.81 W .0 7 S 55 6 M -0.61 0.,2 0.61 S 0.85 g 0 6 N 59 52 'id -0.60 0.,8 0.60 S 0084 ~ 962o00 962.00 900000 1062.00 1062.00 1000.00 1162.00 1162.00 ~ 1100.00 1262.00 1262.00 '1200.00 1362000 1362000 1300.00 1462.01' 1462.00 1,00o00 1562.01 1562.00 '1500.00 1662.01 1662.00 1600.00 1762002 1762.00 1700.00 1862.02 1862.00 1800.00 0 5 S 83 49 E -0.71. 0.33 0.71 S 0.86 bi 0 16 S 40 50 E -0.91 0.59 0.91 S 0.79 ~d 0 19 S 54 21 E -1.11 0.56 loll S 0.,4 Id 0 19 S 63 51 E -1.25 0.58 1.25 S 0°02 E 0 19 S 64 0 E *','1.44 0.26 1.44 S 0o57 E 0 21 S 67 ,Z E -1.71 0.29 1.71 S 1.20 E 0 25 S 63 33 E -Z.07 0.28 2.07 S 1.8' E 0 3, S 50 33 E -2.62 0.37 2.62 S 2.48 E 0 36 S 35 24 E -3.24 0.72 3.24 S 3.11 E 0 33 S 39 11 E -4.05 0.03 4.05 S 3.80 E 1962003 1962.00 1900000 2062.03 2062.00 2000.00 2162.04 2162.00 2100000 2262.04 2262.00 2200.00 2362.05 2362.00 2300.00 2462.06 2462.00 2400.00 2562.06 2562.00 2500.00 2662007 2662.00 2600.00 2762.08 2762.00 2700.00 2862009 2862°00 2800.00 0 35 S 39 51 E -4095 0.35 4.95 S ,.45 E 0 33 S 37 28 E -5.77 0.,7 5.7_7 $ 4.97 E 0 41 ~ 32 37 E -6.59 0.29 6.59 S 5.50 E 0 43 S 24 21 E -7'57 0°68 7.5? S 6.03 E 0 32 S 16 25 E -8.56 0.55 8056 S 6.'8 E 0 36 S 18 36 E -9.53 0.16 9.53 S 6.85 E 0 36 S 23 48 E -10.64 0.19 10.64 S 7023 E 0 46 S 18 14 E -11.73 0.47 11073 S 7.55 E 0 51 S 11 13 E -12.91 1.07 12-91 S 7.90 E 0 53 S 15 30 E -14.45 0.00 1,.45 S 8.34 E 2962.10 2962.00 2900.00 3062.12 3062.00 3000.00 3162.13 3162.00 3100.00 3262013 3262.00 3200.00 3362.14 3362.00 3300.00 3462014 3462.00 3,00.00 3562015 3562.00 3500.00 3662.16 3662.00 3600.00 3762.17 3762.00 3700.00 3862.17 3862.00 3800.00 0 57 S 15 51 E -16005 0.12 0 56 S 5 50 E -17.63 '0.37 0 49 S I 58 E -19.23 0.26 0 34 S 3 27 Id -20.37 0.78 0 27 S 0 12 id -21.12 0067 0 34 S 28 12 E -22.01 0.33 0 55 S 12 10 E -23.26 0.13 0 ,1 S 15 10 E -24056 0.09 0 44 S 18 42 E -25.82 0.33 0 33 S 8 26 E -26.86 0.43 0.00 0.00 62.00 62.00 162000 162.00 100000 262.00 262.00 200000 362.00 362.00 300000 462.00 462.00 400.00 562.00 562.00 500.00 662.00 662.00 600.00 762.00 762.00 700.00 862.00 862.00 800.00 FEET DEG/IO0 FEET FEET 16.05 S 8.76 E 17.63 S .9.06 E 19023 S 9.22 E 20.31' S 9.18 E 21.12 S 9.23 E 22.'01 S 9.52 E 23.26 S 9.90 E 24.56 S 10.28 E 25.82 S 10.58 E 26.86 S 10.89 E FEET DEGMIN 0.00 N 0 .'~0 E 0.06 S 61 29 If 0.28 $ 58 12 bi O.3B S 0.57 S 54 3 bi · 0.78 S 52 50 Id 0.93 S 51 21 1.01 S 53 8 M 1.05 S 54 21 Id 1.04 S 54 34 bi 1.1Z S 50 34 Id 1,20 S 40. 58 If 1.20 S 21 24 U 1.25 S 0 52 E 1.55 S 21 43 E 2.09 S 35 8 E 2077.. S 41 37 E 3.6~. S 43 ZS~E 4,049 S 43 50 E 5.56 S 43 12 E 6.65 S 41 57 E 7.62 $ 40 43 E 8.58 S 39 51 E 9.68 S 38 31 E 10.73 S 37 7 E 11.73 S 35 42 E 12.86 S 34 12 E 13.95 S 32 48 E 15013 $ 31 27 E 16.68 S 29 59 E 18.28 S 28 38 E 19.82 S 27 12 E 21.33 S 25 37 E 22.35 S 24 15 E 23.05 S 23 37 E 23.98 S 23 23 E 25.28 S 23 3 E 26.62 S 22 43 E 27.90 S ZZ 17 E 28.98 S ZZ 5 E KELLY BUSHING :ELEVATION: ::: 6ZOO0 FT ENGINEER: MCBRIDE · INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH VERTICAL OOGLEG RECTANGULAR COOROZNATES HORIZ. OEPARTURE, SECTION SEVERITY NORTH/SOUTH EAST/MEST DIST. AZIMUTH COHPUTATION DATE: 9-JUN-90 PAGE ARCO ALASKA~ INC. PHDid 1-2 PRUDHOE BAY NORTH SLOPE~ ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG DATE OF SURVEY: OT,-APR-1990 KELLY BRUSHING ELEVATION: 62.00: FT ENGINEER: RCBRZDE INTERPOLATEO VALUES FOR EVEN 100 FEET OF SUB-SEA OEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORZZ. OEPARTURE SECTION SEVERITY NORTHtSOUTH EAST/WEST OZST' i AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG #IN 3962.18 3962.00 3900000 ' 0 38 S 14 23 E -28.02 0.58 0 28 S 5 33 E -28.93 0.21 0 32 S 9 13 E -29.87 0.27 0 20 S I 41 E -30.55 0.09 0 26 S 13 31 id -31.15 0.51 0 26 S 3 7 E -32.00 0°42 0 12 S 9 27 E -32.56 0.52 0 10 S 3 29 g -32.79 0.00 0 22 S 1 15 E -33.34 0°03 0 8 S 31 23 E -33°75 0.00 4062.18 4062.00 4000.00 4162.19 4162.00 4100.00 4262.19 4262,00 4200.00 4362o19 4362°00 4300.00 4462°20 4462°00 ,562.20 4562.00 4500.00 a662.20 4662.00 4600.00 4762.20 4762°00 4862.20 4862.00 4800.00 39'46 g -33.91 0.71 35 14 id -34.33 0.26 TO 30 W -34.51 0.21 53 22 id -34040 0.18 40 7 W -33.75 0.34 47 57 ~ -33.04 0.11 19 20 W -32.71 0.59 46 26 g -32.28 0.01 44 51 W -31.97 0.16 26 35 g -31.57 0.00 4962.20 4962.00 4900.00 0 14 5062.20 5062.00 5000.00 0 14 5162.20 5162.00 5100'00 0 16 5262.21 5262.00 5200.00 0 22 5362.21 5362.00 5300.00' 0 40 5462.21 5462.00 5400.00 0 27 5562.21 5562.00 5500000 0 11 5662.22 5662.00 5600.00 0 19 5?62.22 5762.00 5700.00 0 16 5862.23 5862.00 5800.00 0 25 0 25 0 25 N 26 35 id -30.92 0.00 N 26 35 M -30.64 0.00 5962.23 5962.00 5900.00 6005.00 6004.77 5942.77 28.02 28.93 29.87 30.55 31.15 32.00 32.56 32.79 33.34 33.75 33.91 S 34.33 S 34.51 S 34.40 S 33.7'5 S 33.04 S 32.71 S 32.28 S 31.97 S 31.57 S 30.92 30.64 11.05 E 30.12 S 21 31 E 11.23 E 31-04 S 21 13 E 11.28 E 31.93 $ 20 41 E 11.39 E 32.61 S 20 27 E 11.31 E 33.14 .S 19 57 E 11.25 E 33.91 S 19 22 E ) 11.32 E 34.47 S 19 10 E 11.33 E 34.69 S 19 4 E 11.32 E '35o21 S 18 45 E 11.41 E 35.63 S 18 41 E 11.37 E 11.16 E 10.78 E 10-2.5 E 9.68 E 8.99 E 8.69 E 8.38 E 8.01 E 7.74 E 35°76 S 18 33 E 36.10 S 18 0 E 36.15 S 17 21 E 35.89 S 16 36 E 35.11 S 16 0 E 34.25 S 15 13 E 33.84 S 14 52 E 33.35 :S 14 33 E 32,96 S 14 4 E 32-51 S 13 46 E 7.41E 7.27 E 31.79 S 13 28 E 31.49 S 13 21 E COMPUTATION DATE: 9-JUN-90 PAG. E~ '6- ARCO ALASEA, INC. PHDW 1-2' PRUDHOE BAY NORTH SLOPE,*ALASKA MARKER UGNU SAND TOP UGNU C GCT LAST READING PBTD BOTTOM UGNU C TOP UGNU 8 BOTTOM UGNU B WEST SAK TO DATE OF SURVEY: O7-APR-1990 KELL! BUSHING ELEVATION: 62oO0'FT ENGINEER: MCBRIDE INTERPOLATEO VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 761* FSL & 252· FWL~, SEC31 T11N R15E MEASURED DEPTH BELOB KB TVD FRON KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/BEST 5525.00 5525.00 585'1.50 59O0°O0 5907.00 5907.00 5994.00 5994.00 6005.00 5524.79 5462.79 5524.79 5462.79 5851.Z8 5789.28 5899.77 5837-77 5906.77 5844..77 5906.77 5844.77 5993.77 5931.77 5993.77 5931.77 6004.77 5942.77 32.80 S 8o74 E 32.80 S 8.'74 E 31.64 S 7.77 E 31.33 S 7.61 E 31.Z8 S 7.59 E 31.28 S 7.59 E 30° 71 S 7'30 E 30.7! S 7.30 E 30.64 S 7.27 E COMPUTATION DATE.' 9-JUlkgO PAGE ARCO ALASKA, INC. PWDW 1-2 PRUDHOE BAY NORTH SLOPE~ ALASKA MARKER UGNU SAND TOP UGNU C PBTD BOTTOM UGNU C TOP UGNU B BOTTOM UGNU B WEST SAK TO DATE OF SURVEY: OT-APR-1999 KE[LT BUSHING ELEVATION:' 62.0'O:~"FT ENGINEER: MCBRIDE SURFACE LOCATION = 761e FSL & 252~ FWL~ SEC31 711# R15E MEASURED DEPTH TVO BELOW KB FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 5525.00 5524.79 5462.79 32.80 S 5525.00 5524.79 5462.79 3Z.80 S 5900~00 5899.77 5837.77 31.33 S 5907.00 5906.77 58¢4.77 31.28 S 5907.00 5906.77 58¢~.77 31.28 S 5994.00 5993.77 5931.77 30.71 S 5994.00 5993.77 5931.77 30.71 S 6005°00 600~.77 59~2o77 30o6~ $ 8.74 E 8.74 E 7.61 E 7, 59 E 7.59 E 7.30 E 7.30 E 7.27 E F]:NAL WELL LOCATION AT TO: TRUE SUB-SEA MEASURED VERTICAL VERTICAL' DEPTH DEPTH DEPTH 6005.00 6004.77 5942.77 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG WIN 31oa9 s 13 ~21 E SCHLUMBERGER O I RECT I ONAL SURVEY COMPANY ARCO ALASKA, INC. WELL PWDW 1-2 FI ELD PRUDHOE BAY COUNTRY USA RUN ONE DATE LOOOEO 07 - APR - 90 REFERENCE 7389S WELL', PWD~W 1-2 (761' FSL, 252' FWL, ~EC 31, TllN, R15E, UM) HORIZONTAL PROJECTION $CRLE = ! / ! 0 ! N/FT 113 -2O -3O -4O SOUTH -50 -90 ~E5T -2O - ! 0 0 I 0 20 E)O 40 ~o E ~,<-5 T WELL' (761'" PWDW 1-2 '-~' VERTICAL PROJECTION FSL', 252' FWL, JEC 31, TllN, R15E, UM) BOUTH -~0 -40 -30 -20 -10 0 0 10 20 - ~ L d ' ~--i-' W'~" -~"'-*~+'-"'+'~-*-~ ..... H-+" ..... ~'* ..... ~'+i- -+""~'4 .... f'i ..... ~ ..... ~'~'~ ...... r'-f'¢' '"- ~. L~-~-.~.~...I-...--~.-~..~.q..4...~.~-~ ~ ~. ~ -.~.-.~...~-.-~-.-~-.~.-.---;-~.~..~...i..i.-+4.-~ -*.-*-~--..4-.-~.+~--. "'~"i"i"~ ..... ~-~q"'t ..... ~...~...i...~..~ .... ~..?--.~-~.~- + + ~ + - ~+ ~- ~ ~ ...... ~-~..~--~.~ ..... ~ ....... .~ ,.~4~ ..... ~-~-~ ...... ,.++..+ ...... ,++-+~-++-?---~-+-~--~-,-~.+- .~-~-m-.~]-,-mq ..... ~'-+ .... 'r~'+"~"~ ....... f'~'"f'~ ...... ~++'~' ¥.,..4-+. 4%+--4-4-++--.?+-++1---f--f-?~ ...... f't"~"5'l"f?? 5'-?'?-'?¢?+' '11'"~,;~-"-?nnn~?'1"t-~ .... i"'~'","~ ....... r' ,--.r--; ...... ~mt"r'--'f"f"f'i"' 5i ~ ii~ ~..~ L4...LN...L...L~.~.&.t4...LN-..../-;..~../ ....... LLFi ...... ~-4..~.., ...... L444 ....... L4.44.-.~..4-N..F.+L.!..4'....~-4...~.-.* ...... LN...~ ....... ~..4...F,... ...f.+.+..~ ...... ~_.L.~...~... ]h']~]~. 4. L ~ .i ...... i.X..~.4.. ~ i- z4.,...;..~...i..4...4..~.4...i-..4.4-..;4 .... : %.4.....~..-~-+..+..~...;..~.~-~ ........ e-4-.+-~-.-4---H.-4.- -+-+'"t"'+ ...... f"t'4"+" 'T T ~ '~ ~ ~,t,,, ~~-' _~, ~,~, ~ '"'f"f"H ...... t"T'"t"ff ...... T"~"t"t ......~ ~t'"t"'z'"t'- ~, ~/ ~ i ~ ~ ~ ~ ~ ~.~ ~ ~ ~.~ ....... L.&.J._L..'.. L..L..1~....L..~...i_~_...4-~..~..4 ...... ~"';"~';"'-~"+-+"~"-i-+-f'+"q"+'+'"f'+"FT~-i"~ ....... ~'~'"~'-~" .~.-.~-+..'...~...,..¢.~ ...... *..-.;.-+-+-?+--+.+---~ ....... f-+-+-~-f.- --~'-+-+-~ ....... r--t'-~--'t ...... ?"T"?"'%'"'T"r"?"?""%-?-T"Y"~'"%T' ?:-'"'~"r'T"T-- ~ I ~ . "'T'+"?'"?"' ~-, ~-..;..~..~.¢.. ~ ~ ~ ~ ' ' :~ ~ ~ ~..--H4-¢--Ff-~----~4-.H ....... H--Ff-..-~-~-~...: ...... ~...:-:...:.-..¢4..-;-~... 4..F¢..~ ...... H.4--~ ....... f--~.-~ ..... ................. ~...~++.. -r-~'---c'r' "~-r"r-'T ....... YT"~"~""T'T'?"~ ...... ~..4.-4.4 ...... +---*-..t..-~ ................ t ...... +T'f'i-' ~Tq ..... $.-~4--~--- . ................ :::' ~',~'. T" ~'f'f-'f"f'f'f'f"f"f"'"i"i'"f"?f"f'f'f" .-~-i-im H++"~-z'r?'t ...... tJ?l" ,, ' ' ' i ~ iii '' _ ...~...~...+..~ . ~.~.~..~ .... , ' '--- -¢ 1 I t J~ ! i ' ~ .... I ............. I . · : ..., · :.~ ......~,.... . ....................... -~'~-', r'5~:~_~ ~.~.._..,.z.~.x.+~...+...~..,..,.,.,.,.~_ .~Z,.....~.4...~.4~--..=.,.T:, ...... ~q+ ..... ~-~- ~ ......... ~.~ -.+ ........ ~---4--.,.-- ~..~- ~4 ~ 4-..4...~,4...,-.~..~ ............................................. , ................. ,-.=-~--+ ...... , ..... .- ~" h ~ -H- , ~ , -: , ¢'F"-T'~-'T t ~ = ~ ~ t ': :: . i , ~ ~ , ~ ~ ~ : ~ i ~ ~~]' ' . ~t '~'~ ~.: . .... '._{ '- ............ ~ .......... ~ ~..4 ....... ~...L.4..4... ' ' ' -~ ~ ' ' .... i · ' 1 .... :'t ~ i ~ i ~ ;: ~ i i ~ t ~ ~ ~ ~ ~ ~ ~ ! I~ I ~ ~ , ~ l ..~A-~-~..~,.,- .~-.-~.~-+-., ............................... 1 ......................................... ,..,.¢.., ....... +--~ -l-~.--~ 4-~4-~-4--.~-?-{ ....... ,-T+--I ..... [-'~ q-4'-'-+-'h -t-¢ ..... . ............ '-f". ~ i ? ~ i ~ : ~ ~/ : : : : : : : : : ; : : · : ~ : ' · '..' ...... '-.~.-.' .... ~..-~.-'--4--~--.'.--+.-*..-~ ..... ~- '-~--~ --' ................................. ~"~ ..... '~7 ~'~"~'~... ...... rL~5::]::~:-~:. . ~ ~.: ~,~ ~ ~ ~i ?, ?,,'~ ]: ~ ~z:Z: ]]:]~..._ -~g4-~.~-*-4-*-~ -.~.~+ ;-~ 4-, T-4... ~+ ..... ~. ~ j~, ~ ~, ~ ~ ~,~;~ ,~,, 4~ ,~: .~.d.4...: ..... ~-4-~.--~ ....... ~..L,..~....~.4-.~.-~-~J.A....d..¢..F-L-.~.-+--~---: .... ~%.~::: ::~:]~:::~:~ ::::::::::::::::::::::::: :::;::;q::::::::::::::::::::::::: ::~::;:;::::'.::+:z:4~::: :~::G:: ::.F~4--~ .... f-?'i ..... +-'H-f' b'~ q ..... t- 2" ~- 5:!"i-?"']-~-H'"~ ~'~-~'+ '71", i ! ~l% -?"~i~, ,"' -"t"~"'~' ''' ~ ;..Z_. ~ ...L.4...;...;...L.4i ......... ...... ~.--~--4-.-~ ...... ~.-~.-4*-'f ...... 4-*.-4 ..... ~-~--4--4-., ~-.~-.i .4 ......... ~ ~-.4,, ....... 'T~ ,~m"~ .............. T-T. ....................... ] l&, ., ~, , ...... ; .... 1' ~, . ~,4 .... ~..;.,..! ..... ,..~...~-~ ..... ,.-.~...~..., ....... ,..~...,.--~ ............ *"~'-*--'~---*-'-r-~ ............. r"t ......... L'"'f ...... i ..... .'"'-' , - ~ ~ ~ , J I : i i i i i i : i : : : ~ ~ ~ , : ! : : : i ~ : : i : .,...'...:..,, ........ '...~...'..,~ ....... ~...'...¢...~ ....... '...'. ~ ........ ~-.+ ........ 4 ...... * ........ +-..*---?--. -~-i'~--T-i-!-"rq-r'i"~"~ ....... r'?~"'r"~'"r"r"r-r-'f'T"r"YT'' 'T'r'TT-'-T'TT'T"~-'FT'TT'r'~ ~ ? ~ ~ ~ T ~ ~ T ~ ~ ~"~] ~ ~] ~..~ ...... I_.I...L.~ ...... Z.4.4..~... ~--+---~-,~--~1-¢.++-~ ...... ~.-4--+--i ...... i'-'i"-'?'T"Y'i"~-T" "'ri'-t"~ ...... ~"T'~"r'~"T"~"'r"~"FT-FT'T'" '¥1'UU~'3F"r'T"~ ...... t'TT"F""! ...... I t : i I ~ i ~ ~ i ~ i ~ i i ~ i ~ : { ~ : ~ ~ ~ i : ~ ~ I ~ ~ i ~ I i : : ~ : : : :.. ..... ._ '~ ....~ ~ .... ~...: ...... a ............... ' .....~ ~..4.-. '--*-'~-+'--"t '+'4"~"~" ...+.+..f..-t...+...,....~ ....... +-.-+--+-+-- ..~---+-..~.--r-. "?-¥'r'~ ....... *-~'"*'"~ ....... t ....... *-' --*" '"r"{ ...... r'-?'r--~ ...... T'"r',"~ ~ t J { ~ ~ . = ..... , .... ,.,, i, ........... .............. ,..., ....... ........ ,. 4 .... , ....... L,-..+...+..- -4~ .... *-~- -~-t~-~-""*--t~"~"'-'¢--+-*--~ ........ ~"* ....... T'~-*~' '-'~-"~"*" r". · %. T : ~ . , . i ~ , ~-4 .... ~-~--~ ........................~ ,---t ....... ~ .... ~- ~.~--.r--?r. , ~ ~ ~ ~ ~ "" I ..,, ..... ..... ...... ....... ,_,_,..., , ........ ....... ............. .... _..+_.., .......... ,j..., + ,..,... ...... ...... , ~ . ~ ,,,. ........... ,.. , ............. . ............................. , ............. --'..-~-,-,.-.+++, .... ~-++.+--.-+-+-?---~ ....... ,.+.+-+-~-+?+-? "?r-~'"~'"-'H-T'+--T"~-rT'~-'r"r"~"~ ....... ?"?'t"~"'r"~"-r"rq"T ~ t t ~ ~ t ~ ~ t } ~ ~,,, i,' ........ ' ,~ 4~ *'', ~ ~ ,' ,~', ' ~ ~,z:+ 4~1 ................ 1 .......... ~ ....... -~ ..... ~+-~... -?-+.-4--~-~-+--?+--+--.'.+-+'+-?'-~--+'++, ...... *'.'~'+"~'"~'T .... .74-.-~ .... ,.+'~+-?-'r".'--r"r"~-?"r"{'":"', ..... ~ ...... ~ ...... ."T",' ~ ~ , , : : ~ ....... : , ~ .-4 ~-+..4..4...~.4. .+.~...~.; ;...,...~...~..., ...... }..+..~...4 ...... T"' ............... ~"'*"+'~ ' + t-.t .............. ,...t..- -.~-.~ }..4....-+-4.4.---.~--.{.-.{.-4--.+ ...... ~-+.4---.~ ...... ?-.?--.:-~ ~ T'?~ ~ ~ · , · , , · · , . .... i i i ; i , , , = .... . , -~4~-~.~4.+.. -*-~-~-4 ..... ~..4..~-~ ...... ~...~....~.+~.+,+~ ...... ~-+~'+"'L~-++i-+f'~'i ..... f'?~'~ ....... r-r'-f'~ ...... 71"+" "!"~q"i ....... f"fl'"~ '"~"'t'"f"~ ....... N-TI' ' ' ~ ' ' ' ' ' ' · + 4 ~ + + + ..~ ...... ~-'-+ .... ~' ~ .... , I * . z . * 4 4 ' ' ' --' ...... ~--4.-..~. ~--- ¢ ' 4 ........ ~ --.~ ............ +--*-"--~'~'" "~"-~-'+"'¢'"*"'+ ....... + ' ~ ' ~ ' ~ t ~ , , ? T , , ' .... ~--74~.-.,-.~--,---~ ....... ?,--,--,- ~ . . : -+ ~ · ~ ~ ~ ~ 't' ~ .... 1~ · . ~2~ ~i ~ ~ &X ~ ~ ~ ~ ~ ~ i ~ ~.; ..... L..~..~ ~ .~ ,g~ {-4 · ~...{-S-k..~..~-!-4.-b4-..~--~.4 ...... ~...*.-T--~ ...... ~..1--+.4 ...... +--+-+--{ ...... 0.+-.f.-~ ....... +-4..+..? ~t~.! !- ~T~']-"i'".{-~i ....q i ..... T'] ....... I-T7] i Z ~ T~ ' ~ 14- ,4 ¢ 4 44--4--'-.~-4 4 1, ~ }...i..k.i 4. 4..~..,...i ..... i*''l'"i'"*"4 ........ ,'...i._i...~., ...... ~.-.i...}... ,=,, .... ...... ,...,...,...+ ....... ...... ,..,......., ..... +.....+., ....... I ...... ...... , ...... ,.--+-.. · .~ L.. L ~. ~ ..... .-.~..~- -.~..~.4.-~ ....... ~.-4--4.-~......4..~...i..J- ..~. '...' ...L..=_~.~ ..... *...~--{-..~-..--*.-4 ....... +...-+~..+-.~'--'+'~"+"* ...... .'".'"~"'~ ...... T'T"*'"~ ........... *'"* ...... ?-,'"7"r" , i 1 : t I ~ ~ ~ i ' ~ ~ ~ ~ ~ ; ~ ; ' ~ ' ' : ~ : ~ '4-4 -. '-.-'.. '--~ ...... ~---4--.~-..~.-.-.4--.~--4--.~ ....... +.--~-.-4-..~ ...... ~--.~--.~...~ ...... ¥-~.-¥"~ ......... ~'"'"~ ......... ~~T*"''4'+~"~ ....................................................... ?-...--~ ...... ,--?-.-~ --~----+ ..... ~ + .... ~ , I . ~ . . ~ ......................... ~ .... , ...... , .. ........... , .......... ~ ..........................,.~ ~.-.+ ........ ~'~ ....... ~*"~"4"4 ...... ~"'~"4"~ ...... 4--,*----~"-~'" ;---4---~----~.-'4---'--4---4---+--4---~ "'+--t'"*-4-- h'?-~'~'"* ....... t"~"'*'"?'"~-'~'"~'", ......... ~"'~'"?'"? ....... ~"? ~ t ~ ? * * -[ !-.~.~.]~.~-~-Z~-- ~ ~ ~..~.4.4.4.-..t-.4.4....~..¢.....4.4.+4 ...... ~-+.4..4-..44.4.-.+ ....... N.-.Gq.+i...f.~ ...... ~-~.~-'+'f"+ ...... ~'++-~ ....... f"f"t'"t ...... t"t'T'~ ...... ~ ! I ~ i i - j ~ i ~ i i ~ ~ ~ J ~ : ~ ~ i ' : ~ ' i ~ ~ ~ ~ ~ ~ ~ : ~ ~..'.4...: ...... L.*...L.4 ..... LA...L4 ...... L.~...L..~ ....... :...~...~...¢...~ : ~ ! ~ ~ ~ . : . , : : : : , : , ~ : * : ! } : : ** .. '....-~.-~-~.-~ ....... ¢..+-~..*...~ .*.+.-4-*+--~ ..... *-..¢..4-.4 ....... +'"4"'*'"'*"1 '"*'"+"~"'* ....... t'*'?T"'~ ...... ~'"*"'r"t ....... ?,...-,**-r ~'f' ~'"'F ,":~-'"T'T'?T'~-'T"T'T"T"F'T'~-T'T"-T'TTT-~"T'TT~ ~ ~ ~ ~ ~ i , ~ ~ ~ ~ . ~ ; ~ ~ ~ ~ ~ ....... ~...:..4 ...... ~..4...*..~ ~ .... ~ : ' · '~ .... ,, ..... rT','] ....... ~",'T'~2"T-?"CV. ~.,.. ~..d..,.4_~.4_~.~_,..~+...,.~_~.4.4-..~..¢44-~..4...~..~...* ..... F'* ....... * ...... ~"'~'+'*"'~"+"*'"~"'~ ...... H-.4.-'~ ...... ¥.¥4...+ ..... ~-.+-+-.~..-~ ::~:: :'~ :~ ~ ......... ~ .... ?"?'~"-~ ....... ? ? ? ~ '/ · ' / j ' : ! ~ ~ : ~g~.~-- -4-~-~...~. · -~..~ -~ ...~.-.i..~..~ ........ ~--~-.~--4.-~--~..-4..-4.-~ ...... ~.-+-+-., ....... %+--+-.i ....... ?i'"l"-?"~ "+'+"?'"' 'T"T'"F'~ ....... ~'"~-t"~"'~ -'~ ...... T"~ ...... %','";'"~ ...... 4-~-.L ..... ++ -~ ........ ~ ........ ,.~.-~ ...... ~.--,.~..~ .... +. -+.-r--?-.? -- r. ~ . i ~ , ' ' , . ~ + i ~ , , ~ i ' , .............. ¢ .... ~ ,4-. , ..... ,..., ......................................... ~ ..........~ l....t ....... *"'1"';"'*"+"~ .......... r..* . ' -4-1 ..... ~-~ ..... 4 ~- -* .................................................. ~-","~ ......... ~-,.'-t"* ........ ~ . : , ~ --T t ~ : ' : ' ' ' ..... , .... : : : : : ' ; { ¢ ¢ ;.-~...; ...... ;...)..4. *- ; ..... ; ....... ;-..*....~-.-4.-. · · · : · ~ '-'~ ' ~ ' 4 -~---~--~.-.{----~---~---:---~---+..-~--* ....... ~'"~--~-'~ ...... +.---'~---* ...... *'"~'"*"'* ...... ~ ' · ' T . ....... ~ : 3O NORTH PROJECTION ON VERTICRL PLRNE NORTH - SOUTH SCi:lED IN VERTICAL DEPTHS HORIZ SCRLE = 1/10 IN/FT PERMIT # ,,/~ - 3 ,.~ WELL NAME ~,~.~ ,,~,~v,~ ~ /~ COMPLETION DATE ~ i/~ i ~ CO.~'~'~ ~ ~1~ I~ i ~ ] "AOGCC GEOLOGICAL'MATERIALS INVENTORY LiST ( check off or list data as it is r~ceived ) , , ,,riff? [ /'o/~/~ drillin~j histor~ '~/ survey l~"/~,[[tests J ,core de~fiption] ' ·cored intervals core analysis dry, ditch intervals digital data · I .......... I I , , , , , "' LOG TYPE ...... nUN' iNTEI::iVALS ' scAIF ' NO. ~ ~/~. ~; / ~'- ~~' ,-,,, ~' ..~,.-~ ~ Z~ .... / V~' - ~~' ~" c ~T / ,, ?& / - ~&~° ' ~" ........ 7) c~ ~ / ~ /- ~2~&/ ~" ..... / ~1~, ~', ~1 , ...... , A i'q C FI F) R A G [-", A I.. A 2 K A 995'. DATE' REFERENCE' ARCO CA~'E:D HOI_E F'INA[..2 /i -"2 8- i (':'-90 F'ERF RECORD 4-~ 8-i:3-9¢: DUAL BUR2T TDT-P - 5 - i i 8 - 7 - 9 () C. 0 L t_ A R / I::' E R F 5-i4 '?-ii-9(3' DZAGNOS"TZC I"-M ~:- ~ 4- c:_ ~.: i i - o t.') P E R F' R E C 0 R D ,~., .. 6--,; 8- i i -9;.'-) COLLAF'.'./F'ERF" .6 - "-2 4 8 -" 9 "- 9 0 C N L -(.; R /C: C 1_ · --'?-27 '7-27-9t-'.~ I NJECI' t Oi',! PROFILE · -'T-33 8-i i-90 COL. L. AF;'./I::'ER.F' o -'.~':., ?-28-9(:;, ]: N,JFZf~T'r ON F'ROF.I: LE · · ..._ ...... ~ · -.-.o- 4".~., .: .... 8-5:-9,::) CBT --9--42 ,c~_,:,-._~,F.;.., ..,- , ._. CET. · i i-4 ~:: .... v--9(.) CNL..-[~F;:/'L':CI... ~ i '-2..¥ 8- i 2-9('} COL. I_/4F;~'/F'E.:.RF' ~ i 2'- S 2 '? .... '-25 - 9,:.'-) F' R 0 !::: U C'f' ]: 0 N P f;.'. 0 F:' I LEi. .... '; =- 90 ..i'~'- ," ,::,--_~- r EI".F RIFCI. JRD ~ 3 - i~':' 7 - .-_. '''~ ,_, '~: --o: ;':":. D 't A C: N 0 E.' i" i F:... F H · .. P k:r,..I'- REf":K~'D j S'- t ~ 8-4-9;:; '~'-""- ..... ~_.~ ~: _ o,-:'-, F'RFiOI iF'.-i" T f'ii'..~ PRFiF't LEE . ......-P W D W i-'~ 8-'7-9 G., CCI_ RUN RUN R U N RUN R U N RUN RUN RUN RUN RUN R l.I N R U N F.:UN R U N J:;.'. U N !:;.'. l.j N R U N R U N RUN RUN F'LEA2E eIGN AF!D RETURN :"~'- D ~--. , I-,t::. ATTACHE F,'~ .... :IVED B HAVE: A [:,A",". / AU6 2 2 1990 SAi_LY HOF'F'ECKFR C: 0 P Y A ~-: R E C E.': t P T 01::' D A i" A A P P R 0 V E D .~"~jJ_~ '~~ 'i'RANi::~ 9'".255.S i ' i 1 i 'i, i i, i i, i i, i, i, i, i, i, i, 2CH 2CH A'i-LAJ? CAMCO 2CH A T I_ A A ,~ LA.';'? C A m C 0 ATLA2 C A M C 0 ~'CFt /<JCH A 'T'L A g' CA~CO ~CH C; A ~-i C 0 YCH C A M C 0 A'TLA:~ DI£'TRIBUTION ~ CENTRAl_ FILES -.- CHEVRON. D & M ~ EXTENSION EXPLI_']RAT I ON ~~ EXXON MARATHON ~- MOBIL F'H I I_L lI-~"" F'B WELL F']:L. ES R & D BF'X ~;TATE OF ALA~'KA TEXACO * TFIE AF'I~: FOR ii-23 I$ 5,"~--~)29-2i6i~. ** THE CORRECTED AF'I~ FOR iS-'7 12 STATE OF ALASKA ........ ' ' AL ~A OIL AND GAS CONSERVATION COMM, _,ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ,-- Suspend__ Alter casing __ Repair well Change approved program ~ Operation shutdown __ Re-enter suspended well __ Plugging ~ Time extension m Stimulate ~ Pull tubing ~ Variance ~ Perforate ~ Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 761' FSL, 252' FWL, Sec.31, TllN, R15E, UM At top of productive interval 728' FSL, 261' FWL, Sec.31, TllN, R15E, UM At effective depth 729' FSL, 260' FWL, Sec.31, TllN, R15E, UM At total depth 730' FSL, 259' FWL, Sec.31, TllN, R15E, UM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) RKB 62' 7. Unit or Property name Prudhoe Bay Unit 8. Well number PWDW 1-2 9. Permit number 90-33 10. APl number 50-- 029-22024 11. Field/Pool Cretaceous/Unde fined feet 12. Present well condition summary Total depth: measured 6005' true vertical 6005 ' feet feet Plugs Iimeasured) 4000'-4126' Class 'G' cmt (7/19/90) Effective depth: measured 5900' trueve~ical 5900' feet feet Junk (measured) Parted 9-5/8" casing @ 3930' Casing Length Structural 80' Conductor 3435' Surface Intermediate 5958' Production Liner Perforation depth: measured Size 20" 13-3/8" 9-5/8" true vertical 4130'-4220' squeezed 4406'-4430' squeezed 4130'-4220' squeezed 4406'-4430' squeezed Tubing (size, grade, and measured depth) Cemented Measured depth 2850 # Poleset ll2'MD 2000 sx CS III & 3467'MD 600 sx Class G - Top job w/250 sx CS II 3000 sx Class G 5988'MD Packers and SSSV (type and measured depth) 13. A~achments ~ueverticaldepth ll2'TYD 3467'TVD 5988' Description summary of proposal __ RECEIVED AUG 2 o 1990 Alaska 0il & Gas Co~s. ~ chorag .... Detailed operations program ,," BOP sketch 14, Estimated date for commencing operation 15. Status of well classification as: ally approved Oil __ Gas ~ Suspended Mike Minder 8/20/90 Name of approver Date approved Service __n~ ~ .... ~ W¢,11 17. I hereby certify that the foregoing is true and correct to the best of my knowledge~ Signed Title Drilling Analyst FOR COMMISSION U S'l~ ONLY Conditions~ approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance __ ~c, ? Mechanical Integrity Test ~ Subsequent form required 10-. ORIGINAL SIGNED BY LONNIE C. SMITH Approved by order of the Commissioner Form 10-403 Rev 06/15/88 Date ] ] 4/Sl%pprova' No. ¢ ~ .-,/Zg.~,c~J ~,i~t3vmJssioner(':.nm Date 8 I~.(~~ SUBMIT IN TRIPLICATE P JW 1-2 PLUG AND ABANDON~,..~NT PROCEDURE 1. Run in the hole with metal muncher mill assembly. Mill the 9-5/8" casing to + 3625'. 2. Run in the hole with 13-3/8" R'I-rS. Set R'I'TS at 3450' and pressure test the 13-3/8" casing to 2500 psi for 30 minutes. Release R-I-rS and POOH. 3. Run in the hole with 5" drill pipe and 1000' of 3-1/2" stinger to 4100'. Circulate and condition mud. 4. Mixand pump 800 sx Class "G" + 1%S-1 +0.5% D79+0.2%D46at 15.8ppg. Spot cement as balanced plug from 4100' to 3300'. Pull out of the hole. 5. Run in the hole with retrievable bridge plug and set same at 2000'. Run in the hole with RTTS and storm packer, set the R'I-rS (2) joints below casing hanger. 6. Nipple down BOPs. Inspect casing head and replace as necessary. Nipple up BOPs and test same. 7. Run in the hole and retrieve RTTS and storm valve. Run in the hole and retrieve RBP at 2000'. 8. Run in the hole and tag cement. Test cement and casing to 2500 psi. Clean out cement to 3500'. Spot additional cement plugs as necessary to establish a P & A / kickoff plug. 9. Pull out of the hole to begin the PWDW 1-2A redrill operations. 13-5/8" 5000 PSI BOP STACK ANNULAR PREVENTER 7 PIPE RAMS 6 BLIND RAMS 5 DRILLING SPOOL PIPE RAMS 3 TUBING HEAD 2 1.13-3/8" CASING HEAD 2. 5000 PSI TUBING HEAD 3.13-5/8" - 5000 PSI PIPE RAMS 4. 5000 PSI DRILLING SPOOL 5, 13-5/8" - 5000 PSI BLIND RAMS 6. 13-5/8" - 5000 PSI PIPE RAMS 7. 13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STA(~K TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PiPE RAMS. 7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETION/ WORKOVER OPERATIONS, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST BOP WEEKLY. DAM 11/20/$9 BOP SCH (FOR: NAB 2ES) ARCO ALAS'KA, Ii"~C~ P.O. BOX i;,D0360 ANCHOF.'Ar;E, ALA2KA D A T F · 8 - 8 - 9 ¢, REFERENCE- ARCO C:A2ED HOLE F'INAL2 'i ':'.- ' ' ;'--- -':-':' ;"') D U A ~ B U IR S' '1' '1' D ':T- F' iR U N "i · S- :5 8--- 'i -- 9' (:.)F' E{ Fi'. F F;..' E: Il:: 0 R TS.', F;.'. U N 'i , -"~--,'3 "~ "': 9" ,' -,:,',- ? (;, 1:' tS F,,' i= RIEC Ot;,'D F,'UN · -t.--7 '?-2.¥-.90 PERK RECORD RUi'..~ i, 4- i 2 '? .... 2.."5--'"i.:":'::' F'ERF I:..'ECORD iRUN i , z: - ~i '~ ::~ '" :"""; - ':;'":" C 0 I.. L A R / P E F;.'. F RI J Ni 5 - '._'5.- '? '- '2 '- 9 ;5 F' t.--_ F;,' F R F C 0 R D R U N i , ~""-...'- - ~ 4 "'-2","'-9':.')r "f'EHP/NOI2E .... F;.'.~ li".J i, 6-S 8-'i-9':'::, CCL RUN i, 7-.5~"; 6-24-9,::') F'ERF Ri.::COF,'D F;.'.Llix! i , i 3-5:. 5""~ 6-9'.':::, F'ERF RECCJRD RUN t , i 5""26 '?-28-",--"'(~ TB5 CLITTER R. ECORD F;.'.UN 'i , i 5-i 9 '7-'i 8'-9~.::' BRK-DOWN TEMF' RUN t , F'WDWi-2 7-2i-',°'::).. LEAK DETECTION/F'IT:~.: F;:UN t , F'WDW'i-'"' 7-'.-"~-':;'r.D t_EAK i)E"I'EC'TIO.~'~/F'IT$ RUN ") F'I_EASE ,?;IGN AND t:i'.E.{"I"LJRN THE ATTACHED COPY A,S' REC:EII::'T OF' DATA. RECEIVED BY HAVE A NICE DAY! ~- CENTI;:AL FILES ,,-'"' F'HII_L-TF'2 ~ CHEVRON F'B WELL FILES D & M R & D · .- E,.TEN$ION EXF L~R~TION ~ BPX - EXXON :~. · .. STA"I'F' 01:'" ALA2KA MARATHON TEXACO ,,- MOBIL C A H C 0 S' C: H Z C I'-t .? C i'-t ZCH A "F I... A S' i..t !_ ;-'...'t S' C 1.-t A'¥ I... A HI_Z I.-tL_:~ 2 C I..I C A H C 0 C A Pi C 0 C A i'i C 0 STATE OF ALASKA 0 ~ ~ ~ I ~_! ~ ~_ ALASr,,A OIL AND GAS CONSERVATION COM,v,,~SION . WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well PRODUCED WATER DISPOSAL WELL OIL [--"] GAS E~ SUSPENDED E~ ABANDONED r'~ SERVICE [~ 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 90-33 3 Address 8 APl Number P.O. BOX 100360, Anchorage, AK 99510-0360 50-029-22024 4 Location of well at surface 9 Unit or Lease Name 761' FSL, 252' FWL, SEC 31, T11N, R15E UM i LC~A?'i~;;~i'q5 i PRUDHOE BAY UNIT AtTop Producing Interval ! V~:.,~ic~l~ i 10 Well Number 728' FSL, 261' FWL, SEC 31, T11N, R15E UM~ ,~i ~,~r'~._.J~. · PWDW1-2 At Total Depth ~_..~ 11 Field and Pool 730'FSL, 259'FWL, SEC 31, T11N, R15E UM CRETACEOUS/UNDEFINED 5 Elevation in feet (indicate KB, DF, etc.) J 6 Lease Designation and Serial No. RKB 62'I ADL 28326 12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. I 15 Water Depth, if offshore 116 No. of Completions 03/18/90. 03/25/90. 6/10/90* )E../P~,,/I N/A feet M SEI' 1 17 Total Depth (MD+'rVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of permafrost 6005' MD/'FVD 5900' MD/TVD YES [~] NO [-] 2223' feet MD 1900' (approx) 22 Type Electric or Other Logs Run GR/CAL, CCL, CET/CBT, GCT 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 SURF 112' 30" 2850# POLESET 13-3/8" 68.0# K-55/L-80 SURF 3467' 17-1/2" 2000 SX CS III & 600 SX CLASS G TOP JOB W/250 SX CS II 9-5/8" 47.0# L-80 SURF 5988' 12-1/4" 300 SX CLASS G 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) ,PACKER SET (MD) 7" 3263' 3200' 4136'-4226'MD/TVD W/4 SPF, 120° PHASING (Squeezed) 4410'-4434'MD/TVD W/4 SPF, 120° PHASING (Squeezed) 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC These perforations were squeezed in Mid- DEPTH INTERVAL(MD) I AMOUNT & KIND OF MATERIAL USED July as per Application for Sundry approval 4448'-4450' ]750SXCLASSG&24BBLMSR-100ACID dated 7/3/90. That information will be ... (SEE COMPLETION WELL HISTORY FOR DETAILS)~ submitted when complete on a subsequent Sun(.r7. I 27 N/A PRODUCTION TEST .... Date First Production IMethod of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO I TEST PERIOD ,~ FIowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ,~ 28 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. NONERECEIVED · · NOTE; DRILLED RR 3/29/90, TUBING RUN 6/9/90, PERFORATED WELL 6/10/90. i;;[.~j(~ OJj.~ Gas Cons, Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ~30. GEOLOGIC MARKERS FORMATION Ti NA,NE .. Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. UGNU SAND 5525' 5525' UGNU C 5525'-5907' 5525'-5907' UGNU B 5907'-5994' 5907'-5994' NONE WEST SAK 5994' 5994' 31. LIST OF ATTACHMENTS ADDENDUM (SIGNED 4/27/90 & 7/27/90) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /i~ ~~ ~~.,/__ Title gRILLING ANALYST Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion repeal and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ADDENDUM Well # PWDW 1-2 Date: 4/8/90 & 4/22/cjq Work performed: Cost: AFE: AS3536 4/8/90 MIRU Schlumberger. Ran CET/CBT/GYRO, Bond very poor. Ran gyro very slow. It did not want to work in straight hole. CET/CBT both show bonding @ 3500'-_+3700'. This is very unlikely. Cement volume was calculated by using 4 arm Caliper of hole +15% excess, to bring cement above Hoss tool @ 5000' cement should be +_270' above Hoss tool. 4/22/90 Ran CET, CBT, GR/CCL w/ 1500 psi f/5822'-3000' Log interpretation: cement bonding through most of logged interval. No BPV installed. Very poor DRILLING SUPERINTENDENT ADDENDUM Well # PWDW 1-2 Work performed: INITIAL PERFORATIONS Cost: $25.000 Date: 6/10/90 AFE: AS3536 Time Summary 1030 1715 1855 2025 2216 2323 0022 0130 MIRU Atlas. Shoot gun #1 f/ 4430'-4434' & 4186'-4196'. Shoot gun #2 f/ 4424'-4434' & 4176'-4186'. Shoot gun #3 f/ 4216'-4226' & 4166'-4176'. Shoot gun #4 f/ 4410'-4424' & 4156'-4166'. Shoot gun #5 f/ 4206'-4216' & 4146'-4156'. Shoot gun #6 f/ 4196'-4206' & 4136'-4146'. Rig down. Press test equip. RIH w/3-3/8 JJ gun, @ 4 spf, 120° phasing. Bottom 4' did not fire. POOH. POOH. All shots fired. POOH. All shots fired. POOH. All shots fired. POOH. All shots fired. POOH. All shots fired. Perf summary: 4136'-4226' 4410'-4434' Perforated w/ 4 spf, 120° phasing STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation shutdown __ Re-enter suspended well __ Alter casing __ Repair well __~ Plugging __ Time extension __ Stimulate __ P, eDalr Channel Change approved program __ Pull tubing ,,,' Variance __ Perforate ~ Other __~ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) ARCO Alaska, Thc. Development __ RKB 6 2' feet Exploratory __ 3. Address Stratigraphic __ 7. Unit or'~roperty name P.O. Box 100360 Anchorage, AK 99510-0360 Service_~_~ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 761' FSL, 252' FWL, Sec.31, TllN, R15E, UM PWDW 1-2 At top of prodUctive interval 9. Permit number 728' FSL, 261' FWL, Sec.31, TllN, R15E, UM 90-33 At effective depth 10. APl number 729' FSL, 260' FWL, Sec.31, TllN, R15E, UM 50-- 029-22024 At total depth 11. Field/Pool 730' FSL, 259' FWL, Sec.31, TllN, R15E, UM Cretaceous/Undefined 12. Present well condition summary Total depth: measured 6005' feet Plugs(measured) 4100'-4126' Class 'G' cmt (7/19/90) true vertical 6005' feet Effective depth: measured 5900' feet Junk (measured) None true vertical 5900' feet Casing Length Size Cemented Measured depth True vertical depth Structural 80' 20" 2850 # Poleset 112 ' MD 112 ' TVD Conductor 3435' 13-3/8" 2000 sx CS III & 3467'MD 3467'TVD Surface 600 sx Class G - Top job w/250 sx CS II Intermediate 5958' 9-5/8" 3000 sx Class G 5988'MD 5988' Production Liner Perforation depth: measured 4130'-4220' squeezed 4406'-4430' squeezed true vertical 4130' -4220' squeezed 4406'-4430' squeezed Tubing (size, grade, and measured depth) 7", L-80 tbg w/tail @ 3263' Packers and SSSV (type and measured depth) '"~ "~ ~" Camco "Bal-O" SSSV ~ 2223' & AVA "PRB" ~)kr ¢. 3200' 13. Attachments Description summary of proposal __ Detailed operations program 14. Estimated date for commencing operation 15. Status of well classification as: August 8. 199(] 16. If proposal was verbally approved Oil __ Gas __ Suspended __ Name of approver Date approved Service Disposal Well 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,~~ ~,4xJ~ Title Drilling Analyst Date Qp FOR COMMISSION USE ONLY ll4/SA4 Conditions of provah Notify Commission so representative may witness [Approval No. Plug integrity __ BOP Test ~ Location clearance __ Mechanical Integrity Test X. Subsequent form required 10- ORiI31NAL SIGNED BY Approved Copy Retl~rned LONNIE C. SMITH :g/b Approved by order of the Commission commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE . , fDW 1-2 PROCEDURE SUMMAix f OBJECTIVE: The primary objective for this workover is to establish isolation behind the 9-5/8" casing. It is planned to perforate the well from 5050' - 5060', 600' below the existing SV1 perforations at 4130'- 4220'; 4406' - 4430' and the old squeeze perfs at 4448' - 4450'. A baseline Temperature / GR log will be run prior to perforating. Following perforating, 150 degree produced water will be injected into the lower perforations for 24 hours. Another Temperature / GR log will then be run to detect any channeling to the old perforations. If channeling is found, the lower perforations will be squeezed with cement and the injection and the logging procedures repeated. A maximum of two cement squeezes will possibly be performed on the lower perforations. The injection and logging procedures will be performed after each squeeze. Following the work on the lower perforations, the old squeeze perforations at 4448' - 4450' will be isolated from the lower perforations and the injection and logging procedures will be repeated. If isolation can not be achieved at any of these points, the well will be plug and abandoned. If isolation can be established, one last cement squeeze will be performed on the upper perforations at 4130'- 4220'. The well will then be completed with a 5-1/2" tubing straddle assembly covering the interval from 4000' - 4500' and 7" tubing to surface. The procedure below outlines the three injection /logging tests and two cement squeezes at the lower perforations, the injection tests at the old squeeze perforations, one cement squeeze at the upper perforations, and completing the well with a straddle assembly. PROCEDURE: 1. MIRU Nabors 2ES. 2. Kill well if necessary. N/D tree. N/U BOPs. 3. Pull and lay down tubing. 4. RIH with mill and PRT. Mill and pull AVA packer at 3200'. , RIH with 8-1/2" bit and 5" drill pipe. Clean out to PBTD. Circulate fresh 9.1 ppg seawater around. POOH. o RIH with RTTS to 4100'. Pressure test casing to 3000 psi for 10 minutes. RIH to 4440' and set R-FT'S. Pressure test old squeeze perfs at 4448' - 4450' to 1000 psi. RIH to PBTD. 7. R/U Camco unit. Run base line temperature log from PBTD to surface. R/D Camco. 8. POOH to 5035'. Set RTTS. 9. R/U E-Line. Perforate from 5050'- 5060'. R/D E-Line. 10. Tie into Flow Station #1. Inject 150 deg produced water into lower perfs. 11. Release R'I-I-S. RIH to PBTD. 12. R/U Camco unit. Run temperature log from PBTD to surface. R/D Camco. 13. POOH with RTTS. ,. , CDW 1-2 PROCEDURE SUMMA~ f 14. RIH with EZSV on drill pipe. Set EZSV at 4735'. 15. Squeeze perfs with cement. 16. RIH with 8-1/2" bit and 5" drill pipe. Clean out to PBTD. Circulate fresh 9.1 ppg seawater around. POOH. 17. RIH and set R-I-I-S at 5000'. Pressure test squeeze to 1500 psi. 18. Tie into Flow Station #1. Inject 150 deg produced water into lower perfs. 19. Release R-l-rS. RIH to PBTD. 20. R/U Camco unit. Run temperature log from PBTD to surface. R/D Camco. 21. POOH with RTTS. 22. RIH with EZSV on drill pipe. Set EZSV at 4725'. 23. Squeeze perfs with cement. 24. RIH with 8-1/2" bit and 5" drill pipe. Clean out to PBTD. Circulate fresh 9.1 ppg seawater around. POOH. 25. RIH and set RTTS at 5000'. Pressure test squeeze to 1500 psi. 26. Tie into Flow Station #1. Inject 150 deg produced water into lower perfs. 27. Release R-i'TS. RIH to PBTD. 28. R/U Camco unit. Run temperature log from PBTD to surface. R/D Camco. 29. Release RTI'S and POOH. 30. RIH with drill pipe and EZSV. Set EZSV at 4500'. POOH. 31. RIH and set R-I-I-S at 5000'. 32. Tie into Flow Station #1. Inject 50,000 bbls of 150 deg produced water into perfs at 4448' - 4450'. 33. Release R-I-i-S and POOH. 34. RIH with drill pipe and EZSV. Set EZSV at 4250'. 35. Spot cement and POOH to above TOC. Perform bradenhead squeeze. POOH. 36. Wait on cement for 18 hours. 37. RIH with bit and clean out to the EZSV at 4250'. Test squeeze to 1500 psi. Clean out to PBTD. , , ¢DW 1-2 PROCEDURE SUMMA_,x f 38. RIH with 9-5/8" R'I-FS to 4100'. Test 9-5/8" casing to 3000 psi for 30 minutes. POOH. 39. R/U Schlumberger. Run CET / CBT / GR from PBTD to surface. M/U lower packer assembly and RIH. Set packer at 4550'. R/D E-Line. 40. M/U upper packer and 5-1/2" straddle seal assembly. RIH with packer on drill pipe. Sting into lower packer. Set upper packer. Test packer and casing to 3000 psi. 41. POOH and lay down drill pipe. 42. Run 7" completion assembly with SSSV. Displace well to seawater and freeze protect. Sting into upper packer and land tubing. 43. Test tubing to 3000 psi. Test packer and casing to 3000 psi. Pressure tests are to be witnessed by the AOGCC. 44. N/D BOP, N/U tree. Test tree to 5000 psi. Pressure down the tubing to shear the shear out sub. 45. Release rig. Turn over well to Production. o ESTIMATED BHP: o WORKOVER FLUID: 1991 psi @ 4400' TVD / MD ( 8.7 ppg EMW) 9.1 ppg NaCI Brine 13-5/8" 5000 PSI BOP STACK I I ANNULAR PREVENTER 7 PIPE RAMS 6 BLIND RAMS 5 DRILLING SPOOL PIPE RAMS 3 TUBING HEAD 2 1.13-3/8" CASING HEAD 2. 5000 PSI TUBING HEAD 3. 13-5/8" - 5000 PSI PIPE RAMS 4. 5000 PSI DRILLING SPOOL 5.13-5/8" - 5000 PSI BLIND RAMS 6. 13-5/8" - 5000 PSI PIPE RAMS 7. 13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPA(~ITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST. ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 5000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETION/ WORKOVER OPERATIONS, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST BOP WEEKLY. DAM 1 1/20/89 BOP SCH (FOR: NAB 2ES) D A T E · 7 .... 'i 7 .... 9 4 .... 2 '7 '"' 9- 9 (') C CJ L. L. A F;.'. /F:' E R F:' }:,.: l...I r..! ..:i .... ¥ 6 .... 2 ~i: .... 9 (i) e R 0 i() i.j {ii: '¥' ]J 0 i",! e R 0 ,c ]i L. }iil {:if I..j I".i 6 ..... :.? '7 .... 2 ..... i? ::") F' i:;..' 0 D U C:"f' I () N P F:-: 0 t::' :[ 1... E R. ti',.! ,:ii, "" 'i 2,:ii*'"' 2 :"!: .... 9 (:," 'i" B G 'T A iii L. R U i"..! A .... 'i '/.2 6 .... 2 S .... 9 (:;, p,r.:.., 0 D U E:'f' I E N P R 0 i::' t I.. Iii] R l..j N "?" '..- 'i 4,:ii, ...-2 4 .... 9 ,:i) F:' R 0 D U C: '¥' i 0 N P R 0 I::' i t... r.'iJ R U i"-.! 7 .... ?-:; S '7 .... '7 ..--9 ;~:, F' E R F; R E C 0 R E.', R i..! i'".! .9 .... 2 9 ,:ii, .... i]2 ':i; .... 9 (:.:, i::' i::.'. 0 ]0 U C: "i' ]i 0 i"'.! I::' i::..' Cji t:; ]] L. [ii I::.] i...I i"'.! 9 '... S 2 '7 -8 .... 9 (i:, W A 'f' !iii R F i... 0 W ...... C 0 N ¥ E N 'i" I 0 N A I... R U N o,. .... S 2 T' .--. 8 .... 9 ,.']:, W A ]" ,r..!] R i::' i... (ii kl. ...... ........ I N V E R 'f' iii. D i:~' i IN 9 ..- ].i.~ ]]2 '7 .... :i~, ..... !? (') ]{) O A L B O F:,' ;!ii 'i" T }} '¥'-..-1."-' I:;,' O N i 2 .... ~i~ 6 - 2 2 .... 9 (.) L. E A K D E'f' E C:'¥' I 0 N R U i"'.! 'i 2 .... '.5 6 .... ':":'" .... ,;....,, .... 9 ;:; L.. E A K D E T iii] E: T I 0 N R U i.-...i 'i 4 ..... i 5: 6 .... ~]!; (-) .... 9 (.) P R 0 D U C: T I 0 N P F;.: 0 F' i I... E I:;.: U i:..! i 6 - 2 3 '? -9 .... 9 G C: 0 I.. I... A R / PIE R I:; R U N i::'W D W 'i .... 2 ,:ii,/'2 9 -.-3:6 /9 G T E H F:' ,!';' U R V E Y ( B A ;~,' E L. ! N E ) R U N Pi...EA;i.;'E ;!; ]:E-N.. AND i:;.:i!:."¥LIRN. THE; A'f'"i'AC:HED COt::'Y A,'~ ,-,..r'"'rt::.... ..... E. :t: F:' 'i" 0 F-" D A'I" A _/ ;ii; A t... i... Y I-t 0 F:' I::'E C 1( iii: t:;.: &l'liS~OBg~ ~-"~'¢"' " A t::' I::' t:;.: 0 v Iii: :( A TO .... i ~':'''''''''' .... "- · ..:. ,::. ::. 'i" t:;,' R N ;:, .,,. ~:' 9 6, i, i., 'i i i 'i D 12' 1' R I B U T I 0 N :,'~ C E N T R A L F I L. E $ f,-' t::' I"11 L L I F:' · ,,."" C H E ¥ R 0 N P B 1,4 F.. I... I... i::' ]:'I...1':: ..... '~''... D & M 1:;..' & D .II: E X T E N S' I 0 N E X P L 0 R A 1" I 0 N :,": B 1::' X :',~ li:.:XXON ;~ L,?I"AI'E OF AI...A,".~.'I<.'A M A R A 1' I.'t 0 N 'f' ii: X A C 0 · '~,: i"i 0 B I 1.. ARCO Alaska, Ir' Post Office. ,.._,, 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 May 30, 1990 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 16-22, L5-18, L5-19, L5-26 & PWDWl-2 As-builts Dear Mr. Chatterton: Enclosed are copies of the subject As-builts for your information. If you have any questions, please call me at 263-4618. Danielle Warner Engineering Aide DW cc: File W1-1 ARCO Alaska. inc. is a Subsidiary of AtlanticRichfieldCompany AR3B q00?-,C VIONITY ~AP ,~~ NOT TO ,SCALE .... NOTES . ~ ' I J ~~ ~ L~~ ~ REC~' L OCA TED WITHIN PRO TRA C TED SECTION 31~ T. II N., UMIA T ~RD~ ALASKA 4J ~~~e F~O ~, Pfs. 30-33 ....... I .......... IIiiii ..... I i I i i,, , ....... WE~L_ _~.S.P. COORDiNATES PLANT ~~TIC POSITION ELEV. LOCATION I IIII I I I ......... , C~Lkn I~ SEC TION ~o. ,O~_T~6 ~ST/~G . .~OROS. ~T. ..~0~. Box ii I I-2 ~946,~01,4669Z~372.4~H 5~,~ ~70,1~,33.~1~*~'~.807' ~.~' W ........... mi .mil ii i r * r ....... ill III ' ~- . BELL A~OCIA .H ~ ~ ~ ~ . ~ ....... .... ' ........... "-~ CONDUCTOR A~-~UIL T ~ ~~ ~~ ~ S.I.P. C~ETACEOU$ WELL PWDW I-2 .,, , _ ,,,,,,.,,...,., .... . , . .... ~, ~,,~ ~ ". ~-.. .......... . ,. 3~7 .............. _... "- ~_...0.. ,9~ ,SSU~D FOR INFORMA"~i~ SS' .................... ~ I~~~' i~, ~ ~ ........ ~zsz~s m ~o,~s~ t oooo '.i C~A-~3tO0-OOtI 0 ........ , .............. , .... STATE OF ALASKA Al'ASSaIL AND GAS CONSERVATION C"-~!MISSION' APPLlC rlON FOR SUNDRY Ai-PROVALS 1. Type of Request: Abandon ,--.-- Suspend ~ Operation shutdown Alter casing Repair well , Plugging Change approved program Pull tubing Re-enter suspended well Time extension Stimulate Variance Perforate 2. Name of Operator ARCO Alaska Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 4. Location of well at surface 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At top of productive interval 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At effective depth 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At total depth 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM Other ,, X 6. Datum of elevation(DF or KB) 30' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number PWDW 1-2 9. Permit number 9O - 33 10. APl number 50 - 029 - 22024 11. Field/Pool Creataceous Pool 12. Present well condition summary Total depth: measured true vertical 6005 feet 6005 feet Effective depth: measured 6005 feet true vertical 6005 feet Casing Length Structural Conductor 80' Sudace 3467' Intermediate Production 5988" Liner Perforation depth: Plugs(measured) None Junk(measured) None Size Cemented 20" 13-3/8" RECEIVED ! 1990 ~ Oil & ~as Con~. Oommlar~on Measured ,dapt~r~ical depth 2000# Poleset 11 O' 2000 sx, ColdSet III, 600 sx, Class 'G' 3467' 9-5/8" 300 sx, Class "G" 5988' measured 4130 - 4220'; 4406 - 4430'; 4448 - 4450' (squeezed). 110' 3467' 5988' true vertical 4130 - 4220'; 4406 - 4430'; 4448 - 4450' (squeezed). Tubing (size, grade, and measured depth) 7" / 5-12" (26~ / 17#, L-80 / L-80, 0 - 3195' / 3195' - 3263') Packers and SSSV (type and measured depth) AVA Permanent "PPB" Packer, SSSV - Camco 7" Bal-O Nipple 13. Attachments Description summary of proposal X Detailed operations program ...... BOP sketch 14. Estimated date for commencing operation June 28, 1990 16. If propOsal was verbally approved Lonnie Smith 6/28/90 ~e of 17. I hereby cert 15. Status of well classification as: Oil Gas Suspended Date approved Service Produced Water Injector that the foregoi is true and correct to the best of my knowledge. Title Operations Support Superintendent- WelIs/EOC Date Conditions of Notify Plug integrity BOP Test .... Location clearance Mechanical Integrity Test Subsequent form required 10- so representative may witness IApproval No./4~) Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIE C. SMITH Commissioner Form 10-403 Rev 06/15/88 Julie Heusser/Dave Smith PRB-24 659-5102 Approved Copy Returned SUBMIT IN TRIPLICATE INJEC ON WELL ANNULAR COMMI. ,CATION VERBAL NOTIFICATION OF AOGCC PER AREA INJECTION ORDER #4 DATE: June 28, 1990 TIME: 12:00 noon NOTIFIED BY: Steve Massey REASON: AOGCC CONTACT: Lonnie Smith Injection Well PWDW1-2 Annular Communication Per Rule 7 Requirements of Area Injection Order No. 4 DISCUSSION: Notified Lonnie that the 13-3/8" and surface were in communication with some pressured interval which responds to injection. I told him our plans were to do an injectivity test down the 9-5/8" x 13-3/8" annulus to determine if we could arctic pack the 13-3/8" annulus. Also we are evaluating the possibility of squeezing the well. AOGCC RESPONSE: Verbal response to go ahead with diagnostic work. Sundry Notice Req'd at this time? YES X NO PRODUCTION ~PPORT SUPERINT~~T -' Original to J. Heusser/D. Smith - PRB 24 cc: Production Support Superintendent (S. J. Massey/J. D. Ottoson) - PRB 20 Sr. Wireline Supervisor (K. M. Kennedy/W. S. Wilder) - PRB 20 Field Area Operations Engineer (C. Farmer/J. Ferguson) - PRB 24 DS Supervisor - FS # 1 FS Superintendent - FS # 1 DS Engineer - ATO~ RECEIVED LIUL 1 11990 /U~ 0Il & ~s C~n,~. Commission (04/05/90) Well PWDW J-2 Spud Date: 3-18-90 Original RKBE: 62" Fop of Sadlerochit: N/A Annulus Fluid: Diesel/6.8 SW All De are RKB ,rco Alaska Inc.- Prudhoe L APl#: ,50029-22024 Completion Date: 6-9-90 Hanger Type: Cameron Gen III Max Hole Angle: 1.5° Reference Log: / Field Well Type: Disposal New I~ Workover I-1 Honger: 30' Angle @ Top Sad. · N/A Caliper/GR 3-26-90 Drilling MD to Top of Equipment except where noted. Jewelry 1 2223' 2 3195' 3 31~' 4 3200' 5 32~' 6 3~2' 7 32~' Camco Bai-O Nipple (SSSV) ID-5.937 Crossover 7" X 5-1/2" AVA LSU Locator w/Seal Assembly AVA Permanent "PPB" Packer Otis 'XN' Nipple ID=4.455 GBS Shearout Sub Tubing Tail ELM Tubing Tail (not Ioggea) Minimum ID: Otis 'XN' Nipple ID.,4~ 5 6,7 Casing and Tubing 13-3/8" 72# L-80 0 9-5/8" 47# I.-80 0 7" 26# !..-80 0 5-1/2" 17# L-80 3195' 3467 Casing 66[X7 Casing 319E PC Tubing PC Tubing 10 10 Perforation Data (ELM Depths) ~. Zone FT SPF 4130-4220 T3 93 4 4406-4430 T3 24 4 6-11-90 Initial Perfs 6-11-90 Initial Perfs PBTD = 5822' TD= 6005' 9 Datum 4C~' SS = 4000'MD ,.SG~' SS = 5000'MD Revision Date: 6-11-90/by, DM, Reason: New Previous Revision: N/A REPORT OF SUNDRY WELL OPERATIONS 0 RIG iN/ 'L , 1. Operations Performed: Operation/Shutdown ~ Stimulate . Plugging ~ Perforate ~ Alter casing ,/ Repair well .... Pull tubing ... Other X Completion 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 761' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At top of productive interval 728' FSL, 261' FWL, Sec. 31, T11N, R15E, UM At effective depth 729' FSL, 260' FWL, Sec. 31, T11N, R15E, UM At total depth 730' FSL~ 259' .FWL, Sec. 31, T11N~ R15E, UM 12. Present well condition summary Total Depth: measured 6 0 0 5' true vertical 6005' 5. Type of Well: Development _._ Exploratory ~ Stratigraphic ~ Service X 6. Datum elevation (DF or KB) 62' RKB 7. Unit or Property name Prudhoe Bay Unit 8. Well number PWDW1-2 9. Permit number/approval number 90-33/90-150 & 90-250 10. APl number 50-029 -22024 11. Field/Pool Cretaceous/Undefined feet Plugs (measured) None feet Effective depth: measured 5 900' true vertical 5 900' feet feet Junk (measured) None Casing Length Size Structural Conductor 8 0' 2 0" Surface 3435' 1 3-3/8" Production 59 58' 9 - 5 / 8" Liner Perforation depth: measured None Cemented Measured depth True vertical depth 2850# Poleset 1 12' 2000 sx CS III & 3467' 600 sx Class G - Top job w/250 sx CS II 300 sx Class G 5988' 112' 3467' 5988' true vertical N o ne 13. Tubing (size, grade, and measured depth) 7" , L-80 tbg w/ tail @ 3263' Packers and SSSV (type and measured depth) Camco 'BaI-O' sssv ~ 2223'~ & AVA 'PPB' pkr ~ 3200' Stimulation or cement squeeze summery Inte~als treated (measured) ~ ~ Treatment des~pfion including volumes used and final pressure 14. N/A Prior to well operation Representative Daily Averaae Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure .. Subsequent to operation 15. Attachments *Completion Well History 16. Status of well classification as: Copies of Logs and Surveys run X Daily Report of Well Operations X* Oil Gas Suspended. r17. i hereby certify that the foregoing is true and correct to the best of my knowledge. /l. Signed '~u v,/, v'-",..z,~~ Title Drilling Analyst Form 10-404 R/e{/05/17/89 Produced Water Service Disposal Wgl~ Date 7-1/~- ~0 SUBMIT IN DUPLICATE ARCO ]nd Gas Company Well History - Initial Report - Dally laatrt~Uo~l: Prepare and lul)mlt t~l "IRIUII Rll~ft" Da th~ flrlt WidhlKIly II~ll · will Ii Ipuddld ir worl~vlf il)frill·ill itl Mlrlld. Daily worn prior to sPudding Ihould bi lummlrlzed o~ the form giving Inclullv~ dltet Mtly. Diltrlct ARCO ALASKA INC. Field PRUDHOE Auth. or W,O, ,OAs3536 NORTH SLOPI ~L: 29326 COYOTE Ii/p®ll hO, WDW! -2 50-029-22024 Operator ARCO AJCO W.i. 21.7000 ]P.o, ,~,tu,,, w.o. 1330 HRS Spudded or W.O. begun ACCEPT Oils Ind d~p~h II Of 8:00 I.m. 05/29/90 ( I~: 0 PB: 5893 $UPV: 1~O 05/30/90 ( TI): 0 PB: 5893 SUPV: RWO 05/31/90 ( i'D: 0 PB: 5893 SUPV: HWP '06/01/90 ( TD: 0 PB: 5893 $UPV:HWP 06/02/90 ( TD: 0 Pa: 5893 $UPV: ~ 05/28/90 Complete record for alch ally rlpertld NAB·RS 2ES 2) 3) 4) 5) 6) ~ Procedural U~'~u·l, SeCUMI 10, Ddlllr~, Pagea ~ snd ~. RIH #/8.5" GR/JB 9-5/8"0 5988' MN:ll.1N&C1/B= MOVE RIG F/WGI-5. ND DRYHOLE TREE, NU BOPS. TEST BOPS TO 5000 PSI. PULL TST PLUG. RIH N/3-1/2' DP AND DISPLACE DIESEL OUT OF TOP 600' OF NELL W/BRINE RU ELECTRIC LINE. RIH W/4# CSG GUN AND PERFORATE 9-5/8' g 4448'-50' MD. POOH. RIH W/8.5" GR/JB TO 5893' MD. DAILY:S25,048 CUM:$1,228,451 ETD:S1,300,000 EFC:$1,578,451 CIRCULATING 9-5/8-g 5988' MW:ll.1NaC1/Br FIN RNG GR/JB, NO RECOVERY. RUN AND SET BRIDGE PLUG ON WL AT 4470' MD. RIH W/OPEN ENDED 3-1/2" DP TO 4463' MD. EST INJ RATE OF 0.2 BPM ~ 600 PSI. MIX AND SPOT 250 SX CLASS 'G' CMT + ADD ABOVE BRIDGE PLUG. POOH 10 STDS. SQZ 2 EBLS CMT INTO PERFS 8 4448-50' MD 8 1200 PSI FINAL SQZ PRESS. BLEED OFF PRESS, CIRC BTMS UP. POOH. PU 8-1/2" MILL AND RIH TO 3506' MD. CBU. DAILY:S91,339 CUM:$1,319,790 ETD:S1,400,000 EFC:$1,569,790 DRLG CEMENT 9-5/8"1 5988' MN:ll.1 NaC1/B= CIRC WHILE NOC. RIH, TAG TiC I 3916' ND. DRILL CMT TO 4150'. CBU, POOH. MU 8.5" BIT AND RIH. DRILL CMT TO 4365' MD. DAILY:S37,215 CUM:$1,357,005 ETD:S1,450,000 EFC:$1,557,005 RIH W/8-1/2" BIT 9-5/8"8 5988' MM:ll.1 N&C1/Bg DRLD CI4T TO TOP OF EZSV. CBU. TEST SQZ PERFS. EST INJ RATE OF I BPM 8 875 PSI. POOH TO 1000' MD. ATTEMPT TO EST CIRC FROM PERFS TO 9-5/8" X 13-3/8" ANNULUS N/OUT SUCCESS. POOH. RIH W/3-1/2" MULESHOE ON 3-1/2" DP TO 4450' MD. EST INJ RATE W/SEAWATER OF 1/4 BPM ~ 1450 PSI. PUMPED 24 BBLS MSR-100 ACID AND FLUSHED #ITH 20 BBLS SEAWATER @ 1BPM, 1000 PSI. MIX AND PUMP 250 SX (51 EELS) CL 'G' ·MT N/LATEX ADDITIVE. SPOT CMT ACROSS PERFORATIONS. POOH 10 STDS. BRADENHEAD SQZ 43 BBLS CMT INTO PERFS. FINAL SQZ PRESS 1030 PSI @ 1/4 BPM. CBU, POOH. MU 8-1/2" BIT A~D RIH. DAILY:S57,467 CUM:$1,414,472 ETD:S1,414,472 EFC:$1,650,000 PREP TO SQUEEZE CMT 9-5/8"1 5988' MN:ll.1 N&C1/Bg RIH W/8.5" BlT. DRLD CHT TO TOP OF EZSV e 4463' ATTEMPT TO TST S(}Z PERF$ #/O SlK~CES$. EST INJ RATE OF 3 BPM I 1100 PSI. C~U, POOH. M~ 9-$/8" CMT RTNR AND itTH. SET RTNR ~ 4405' ND. DISPLACE DP #/$F. ANATER AND PREP TO MTX AND PUMP CMT. DAILY:S38,319 CUM:$1,452,791 ETD:S1,452,791 EFC:$1,650,000 Dr#ling Supt. ~ :'i;~ INumber iJI dal~y will history /omo co~lvMy Plg~ hO. · , I. U~y im pmpMid fM .ich wMI. ARCO C ,tdGas Company Dally Well History--Interim Inlln~¢ll. ltl: Thll form II ulld during drilling or woC~ver oplrltlor4. If ~Mi~, coring, Or ~orltlng. ~ Iormlll~ name In ~flbing ~o~ ~0~. Numar Ill d~ll Ilia lllll leqUlnllllly, Attlch dllcripllOn of MI CO~ Work ~fo~d by Producln~ ~cliofl will ~ m~ed ~ "~Mz~" ~11 unlll ~11 complllion R/pofl officlll or fepre~ntltive IIII on "F~" to~ I) ~mit "~11~" ~11~1 whln filll~ ~! bul not IIII Irlq~nlly ~ t~ ~ ~1~. or (2) ~ Wid~ldly of lhl wllk In which oll ItrmO il ~t. S~bmit wHkly ~r Ior~ ~d following ,lling of oil Itrin9 u~lil ~mpleh~. Dtltrict 41~C0 ALAS~ INC. , 1CoumY or Perilh NORTH SLOPE IsIItl Field PR~HOE ~Y Ic.~ o, u,it P~W1-2 Complete mco,~ for e~~ ~ or ~r In pr~r~ II of g:00 I.m, 06/03/90 ( TD: 0 PB: 5893 $UPV: ~ 06/04/90 ( TD: 0 PB: 5893 $UPV:Hk~ 06/05/90 ( TD: 0 PB: 5893 SUPV: HWP 06/06/90 ( TD: 0 PB: 5893 SUPV:HWP · 06/07/90 ( TD: 0 PB: 5893 SUPV:RWO 06/08/90 ( TD: 0 PB: 5893 SUPV: RWO 17) 18) 19) 20) 21) 22) AK Well RIH W/8.5" MILL 9-5/8"~ 5988' M~:11.1 NaCl/Bz STING INTO k%'~,~.. ATTF.24PT TO INJECT W/O SUCCESS. RTNR VALVE FAILED. POOH. MU 8-1/2" MILL AND RIH. MILL RTNR AND PUSH TO 4461' MD. EST INJ RATE OF 3 BPM ~ 1350 PSI. POOH. MU CMT RTNR AND RIH. SET RTNR @ 4395' MD. MIX AND PUMP 250 SX (51 BBL) CL 'G' CMT. DISPL CMT W/10.6 PPG NACL. SQZ'D 44 BBLS CMT INTO PERFS. FINAL SQZ PRESS - 950 PSI. STING OUT OF RTNR AND DUMP 3 BBLS CMT ON TOP OF RTNR. 'CBU, POOH. MU 8.5" MILL ARD RIH. ~ DAILY:S62,209 CUM:$1,515,000 ETD:S1,515,000 EFC:$1,650,000 DRLG CMT 9-5/8"@ 5988' MW:10.7 NaC1/Br RIH W/MILL. DRLD CMT FROM 4385' TO TOP OF RTNR ~ 4395'. DRLD RTNR AND CMT TO 4461' MD. DAILY:S24,535 CUM:$1,539,535 ETD:S1,539,535 EFC:$1,650,000 CBU 9-5/8"@ 5988' MW:10.7 NaCl/Bz TEST 9-5/8" CASING/SQUEEZE TO 1500 PSI F/30 MIN. LOST 500 PSI IN 30 MIN. MILL UP CMT RETAINERS. PUSH LOWER RETAINER TO BOTTOM AND MILL ON SAME. CBU. DAILY:S26,392 CUM:$1,565,927 ETD:S1,565,927 EFC:$1,650,000 POOH W/DP AFTER SET PKR 9-5/8"@ 5988' MW:10.7 NaC1/B= CONT' CBU. POOH. PU 9-5/8" CSG SCRAPER AND RIH AND CLEAN OUT TO 5890' MD. POOH. RIH W/9-5/8" PKR ON 3-1/2" DP. SET PACKER. POOH. DAILY:S121,374 CUM:$1,687,301 ETD:S1,687,301 EFC:$1,650,000 TEST 7" RAMS 9-5/8"~ 5988' MW:10.7 NaC1/B= FINISH POOH. LEFT SF-.AL SUB ASS'Y OFF OF HST IN TOP OF PACKER. FISH AND RETRIEVE SEAL SUB ASS'Y. RaH W/SEAL ASS'Y. STING INTO PACKER AND VERIFY SEALS. OK. POOH LDDP. PREPARE TO RUN 7" TUBING. DAILY:S21,898 CUM:$1,709,199 ETD:S1,709,199 EFC:$1,650,000 POOH LD 7" TBG 9-5/8"@ 5988' MW:ll.1NaC1/Bz FINISH TEST 7" RAMS. RaH W/7" COMPLETION ASS'Y. STING IN AND VERIFY SEALS. UNSTING. DISPLACE TO INHIBITED DIESEL/SEAWATER. PRESSURE UP TO TEST TUBING. PRESSURE BLEEDING OFF. ROTATE SF2tL ASS'Y. PRESSURE UP AGAIn. STILL BLEEDING OFF. POOH LD 7" COMPLETION ASS'Y. DAILY:S100,827 CUM:$1,810,026 ETD:S1,810,026 EFC:$1,650,000 For form pr~plrltlOn Ind dlstrlbutl~ ~ Pro~-edu~ Manual ~eGtlOn 10, Drilling, Pigel 86 and 8? ]~%~~~ ]""' Drilling Supt, AR3B-459-2-B lNumblr iii doily w~ll hialoP/ Iotas conllcutlvlly JP~oe n~. they Ire preplrld for elch will ARCO Jnd Gas Company Dally Well History--Interim laelnK:li~lt: Thil torm I uled during drilling of wo~kover operetlonl. Numar Ii dr Item tlltl ~quentillly. Attlch ~ripllon of III corel. WO~ ~rlo~d Dy YmOUClng ~cti~ wall ~ re.nco ~ "lnWr~ ~1 until ~11 completion· fllpod officill of repm~nlltivt tilt ~ "Flail" form. 1) Submit "lflter~ ' ~eetl l~n filled ~t but not Iiii frequently thin t~ ~ dlyl, o~ {~) ~ Wl~eldl~ of Ihl wllk i~ which oil II~i~g il NI. ~ll weekly for worko~rl in0 following ~ttlng of oll iI~lnG unlil compllli~, Olltrtct Field ),.,1~CO A~S]c~INC ]C°unty °r plrilh NORTH SZJO~)I~. 1StIll PRUDHOE BAY IL""e °' U"it PWD#I-2 !w''' no II of 8:00 I.m. 06/09/90 ( TD: 0 ~'B: 5893 SUPV: RWO 23) D~tlltng, Pagel ~6 Ind 67 RIH W/7" COMPLETION ASS'Y 9-5/8"e 5988' MII:11.1 NaC1/Br FINISH LD 7" COMPLETION ASS'Y. PU AND RIH N/FULL SET OF SEALS ON 3-1/2" DP. STING INTO PACKER. SEALS HOLD DOWN DP AND ON BACKSIDE. POOH LDDP. MU FULL SEAL ASS'Y. RIH W/SEAL ASS'Y AND 7" COMPLETION ASS'Y. DAILY: $85,790 CUM: $1,895,816 ETD:SO EFC: $3,545,816 I~"' orilling SupL AR3B-459-2-B INumber III daily well hillory forml conlecutlvely IPage no. II they Ire preperld for llCh Will, ARC( il and Gas Company Dally Well History-Final Report IOllrl~llOfll: Preplre E lubmlt the "F~II R~" ~ fie fl~ We~e~ay ifltf IIIow~lt hll ~ ~d or wall II ~ugpd, Abln~d, or ~ld. "FbAl R~* ~d ~ ~bmitlld lllo when O~rltiOnl em ~n~d for ~ in.finite or I~lKlt I~th ~ time. ~ wo~m ~ ~ ~cl~ ~ il ~ ~qui~d u~n cWeti~, re~d completion Ifld mpreNntltt~ tell dill In btoc~ pmvi~d. The '?~ ~' fo~ rely ~ u~ for m~nlno ~ ~tim O~rlli~ if iplCl il ivlillbll. t Accountlng colt center Diltrict ~RCO A~,,~II~ INC. lCounly or Plrilh NORTH S[,OPE slate Field PR~HOE ~Y L... o, U,H ~L: 28326 I P~ffl-2 Aura. or W.O. ~'~3536 ~Tm. C~~ ~: 50-029-22024 1 Fo.t numar of well. (.ctlve or in.clive) on ml~ o~retor ~O A.R.~. W.I. 22 · ~000 Ic~t c~nter prior to plugging ~ ]lhndonmeflt of thl~ ~11 I 05/28/90 !' ~'30 H~ 1p~or 'tu' 'f ' w'O' 8~d~d or w.o.~pT~ O~e f Dill end depth II of 8:00 a.m. 06/10/90 ( TO: 0 Pa: 5893 SUTV: RWO Complete record for each dly ri_oD.ed 2ES 24) RIG RELEASED 9-5/8w0 5988' MN: :6.7 Diesel CONT' RIH W/7" COMPLETION ASS'Y.~ LAND TUBING. TEST SAME. OK. DISP WELLBOR~ W/DIESEL. RE-LAND. RILDS. ND/NU. TEST TREE. OK. SET BPV. RELEASE RIG. **RIG RELEASED 6/9/90 AT 2000 HRS** NOTE: CAMCO 'BAL-O' SSSV 0 2223', AVA 'PPB' PKR @ 3200', & TT @ 3263'. DAILY:S114,910 CUM:$2,010,726 ETD:S2,010,726 EFC:$1,650,000 Old TO ] New TO IPB Depth Released rig I Data JKlnd ofrig Cllor, ificltionl (oil. gal, arc.) I TyI~ completion (lingll, dull, arc.) Producing mathe~ [ OfliCill m~ewOIr name(l) PotentiAl tilt dill WAll no. ~ Ral~wolr Produ~:lng IntervalOil or ~ll Teat time Prodootlon , Pump Alzl, ~OM X length Cl~kl AlZe T,P. C.P. Water % ~ I)revlt~ AIIowI~II -'ffeCtlvl ~ · i I \ For fon~ p/~parlti~a Ind dlltflbutIMt, lee Procedural Mamml, Section DHIIIno, Plgel ~ end AR3B-459-3-C IN~lombor All dally will hlltory forml they In prepared for els will. conlecUtlvlly iPIoI nO. TO: THRU: FROM: MEMORANOUM State of Alaska ALASKA OIL A~ND GAS CONSERVATION COMMISSION ~' DATE: Lonnie .C. Smi~/~~/ July 5, 1990 Commissxoner ~/ - o FILE NO: 3T. HH. 75.1 TELEPHONE NO: SUBJECT: Injection Well Problems AAI PBU DW PW 1-2 Permit No. 90-33 Pruhdoe Oil Pool Haroid R. HawKins Petroleum Inspector, Friday June 29, 1990: I called Lonnie Smith with AOGCC and he ihfo~ed me ~hai~the injection well AAI PRU PW DW 1-2, had a problem and to check it out. I did. The well is now disconnected from the injection source and is shut down. Pressures on well are zero. I checked the pad around the well. You could see where water had flooded on the pad but no hydrocarbons were present on or in the gravel. Production took over well after I witnessed and passed mech integrity tests. Two were performed and passed. This was not where the problem was. The problem seems to be a bad cement job on 9 5/8 casing. When injection was started, it came up around 9 5/8 and then up around and away from the 13 3/8 and 20" and outside the cellar to the surface. I was told by Steve Massey and James Fausett that this was the drilling department's problem and should never have been turned over to production to inject when they knew there was a problem with the cement bonding to the 9 5/8 casing. In summary, the problem was not the MIT tests, it was the long string of 9 5/8 incorrectly cemented in the first place. 02-00lA (Rev. 6/89) 20/ll/MEMO1.PM3 STATE OF ALASKA ALASF .)ILAND GAS CONSERVATION (' VlMISSION APPLICATION FOR SUNDRY A PROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 4. Location of well at surface 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At top of productive interval 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At effective depth 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At total depth 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM 6. Datum of elevation(DF or KB) 30 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number PWDW1-2 9. Permit number 90-33 10. APl number 50 - 029-22024 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 3435' Production 5958' 6005 feet Plugs(measured) 6005 feet 5900 feet 5900 feet Junk(measured) Size Cemented Measured depth 20" 2850# Poleset 112' 13-3/8" 2000 sx CS III & 600 sx CI 'G' 3467' Top job w/250 sx CS II 9-5/8" 300 sx CI 'G' 5988' True vedicaldepth 112' 3467' 5988' Perforation depth: measured 4130-4220'; 4406-4430' true vertical 4130-4220'; 4406-4430' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 3195' MD Packers and SSSV (type and measured depth) AVA permanent "PPB" packer @ 3200' MD; Camco Bal-0 SSSV @ 2223' MD 13. Attachments Description summary of proposal X. Detailed operations program BOP sketch X 14. Estimated date for commencing operation July 1990 16. If proposal was verbally approved Oil Name of approver Date approved Service 17. I hereby, certify that the fo~e and correct to the best of my knowledge. Signed ' Title 15. Status of well classification as: Gas Suspended Disposal Sr. Area Operations Engineer Date FOR COMMI.~SION H~I= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ~((2,~ I Approval No. ~ ~ '"~"'c~ D Original Signed By Approved by orderofthe Commissioner David W. Johnston Form 10-403 Rev 06/15/88 418 MJB cc: J. Gruber, ATO-1478 PI(PWDW1-2)W1-3 Commissioner Approvea L;opy Returned Date I SUBMIT IN TRIPLICATE PWDW 1-2 Non Rig Workover Remedial Cement Job Work Scope Workovcr Objective : Repair cement channel. 1. Make a sliekline tag to verify PBTD. 2. Perform a coiled tubing unit cement squeeze with 150 bbls of cement to isolate the perforations from 4130'-4450'. 3. Jet out the contaminated cement. 4. Log with gamma ray to determine top of cement. 5. Underream cement across perforations. 6. Reperforate as follows: Zone Interval T3 4130'-4220' T3 4406'-4430' 7. Bring well on injection. Other Well Information Current status: Shut in. Expected static bottomhole pressure: 1827 psi. @ 4100' SS Expected fluid in wellbore at reperforation: seawater. 5 4 3 2 COILED TUBING UNIT BOP E~U 1 PI,~ENT 1. ~000 PSI ?" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PiPE RA~S 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. ~XX) PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX NiRELINE BOP EOUIPMENT 1. 5000 PSI 7" WELLHEAD CONN£CIOR FLANGE 2. 5000 PSI WIRELINE RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-Orr ARCO ALA,.?KA, IN F'.~O~ BOX ~ 6,6,360 A N C: H 0 R A G E, A L A S' K A D A T E · 6 / t 9 / 9 '.'3 R Iii: F' E t::.: E N C E ' A R C 0 C; A ;i:; E D H 0 I... IE F:' I N A I... I::~ W D W i .... 2. 6 .... i (!) .... 9,.':i) C f.') L. L A 1:~,' l::'WOt,,ti .... -2. 6 .... i ri_on,, , ..,C-'./F;: -") .... -') -'~ c:.' .... ... ..... · ..: .., .... :'!':; i .... 9 (-) ~ fi!: i"i i::' E F;.'. A'T'I IR Iii: ,~' L.I R V Iii: Y '? .... 2'2 6 .... 9 '"' 9 6' D 1...t A t... B t..j F;..' ;!i; i" 'f' D 'i" '"' F' & F:' 7"" ¥ 4 6 .... 9 .... 9':3 D ]: F' F:' ,, 'i"IE H P E F;.'. A 'f'U F;.:lii: i'i .... 22 6 .... 'i'i .... 9 6' PF:'C 'i 2 .... ':?. ii') ,ii, ..... i 'i .... 9 (') C 0 H t::'tii, iq ;i,;' A 'i" Iii. D N Iii: U 'i" F;..' 0 N 61. / R F:' l... iii: A ;.:'.:; Iii: ;!;' ]: (]. N A N D R lii:'f' t.J R N '¥' l"t E A f' i' A C H E D HAVE A N]:C.:E DAY! RE(~E~vE J UN ~: 0 Alaska. Oit .& Gas Cons. Bom~lss~'O'll 'Nichorag~l -'" C 0 P Y A ?..' I:;: i:i: C Iii: :i: I::' T' 0 I::' A F:' F:' R 0 V Iii: D _~... !....... 'T' F;,' A N ~: :.": 9 '3 '2 '2 '5 ):) A 'f' A,. D I ,::.'; 'f' t:;.' I B U "[' ]: 0 N D A T Iii ' 6 / 7 / 9 () R E F:' !ii; F;.: E N C E ' A R C 0 C A,.? E D H C)L.. E F:' I N A L.. F' W D W i .... '~:, ,::.: -. '::,,::;, .... (:~ n ,'.?Q ~ lei: tE Z E F:' E R F' R I IN i '=." ~, .... ; :~. ; : ..,, , .., ! .,.-' !::'U D W i - 2 5-2 9- 9 (') B R ]: g (; Ii"' F:' L I.J G ;!~,' li.]"l"'r :[ N 6 R E C R U N i., '5" i .... f i 6 .... 2 .... 9,:::, ('; 0 M P N f.'i: U T R 0 N G ." R RIIiN.! i 1::' II ..... .~ ...:' i .... '"' ;:", 6 "~ 2 '- 9,:') C. r') M F' N. IE U T F;.: 0 N (; / 1.;: F;: I..j i'-.~ ,-;. ;; .o .~ ...;' i .... 29 6-S .... ?6, COMP NELI'f'F('ON G/R I:~:L.IN i., 3'"' 2'? 5 .... 24-9 (.) C 0 M P N E U"f' R 0 N R U N i , 5" 4 .... '~ "~; ':"" N J . 2" ...... ,. tc~ 9<i) ""~ .... .... , -" F U,.', I I TIE M r-' R U N i , 6'-',.~ 'J.~--2'.~ .... 9,:"2 Ct]MI-" NIEUTI:;.'.ON RIJN tp, '.:.~" '/ .... i 6 '::.'..,. .... ,_':) 4 -- o (); CriMP ........ NE-'.U'FRON R'[!N ,-~', ~:.'~.. t 2 .... i 8 5 .... 30.-.-?,:.) J ...... ...UI_L.~.~I~ RUN i i ii!..-i 7 .5 .... 2 L~-.9,3 C.'F)MP NELtTRON RLIN i '-'".'" .... ~ ..,.' "-" '" '-':' 9";) C f') M P N 1..- U"f' J:;,' [) N R U N i 8..- t 9 .> .--~.:.,:~ .... .. ,: . .. F:' I... E A i: E ~: I (.'; N A N D i:('. E T U R N T H E A'f' T A C H E I) C 0 P Y A ;'~' R E C E I P T 0 F I) A 'f' A, · .,'-,.- ,. lv I~I.-...EI rED BY .................... HAV i: A )AY! JUN 1 4 1990 :!;' At...L. ¥ HOF'F'E CK ER Alaska Oil & Gas Cons. commlssloti A'r 0 .... ! 2 <? Anchorage APF'ROVE )~~ I'F;,'AN~'~ 9(')2 t S D I ~,' l' R I B U T ]] 0 N ..~ CENTRAL FILES Ji. ~,. CHEVRON ... EXTENSION EXPLORATION EXXON MARATHON · ~" MOBIL '"- F'H ILL I F',S' -ir PB WE'Ll_ F:'IL..ES' R & D ~ BPX ,.'9'f'A'f'E OF AL.A~'KA TEXACO ARCO ALASKA~ INC~ P~O~ BOX ~0~S6~ ANCHORAC;E, AL. ASI<A 995 ~ ~ DATE' 5-2--90 REFERENCE' ARCO CASED HOLE F'INAI...S .l'", 0 F' R C) D LJ C l' I 0 N i'-'? 4-'i F ~',~ i'-t0 4-t 8-90 F'ERF RIECORD 4""i 5: 4-'2.5 .... 90 C.)I...I..AR, F E.I',~I" '7'- t 0 4 "- t 9- 9 G V E R'F I L. C) (; "? .... t 0 4-2t -90 F:'F~'.C)DLJCTIC)N F:'KR 7"'i 0 q'-2i '"'~G F'FC 7-23 4-20-90 CCIMF'L. EI'ION RECC)RD ~'-26 t-2t-90 COI..LAR '['C) SET PATCH 1 5- t t t -" t -90 F:'ERF:' t '?-~ 4-20'-~G CCI_ t 7-t ~ t --t 4'"9G COLL. AR TO ,S'EI' F:'I...LIG F'HDWt -2 4-22-90 CBT F'HDWt '-2 ~-22'"?~ CIET WGI-8 4-22-9~ WGI--8 4-..22-'9e CBT WG ~ -8 4.- 22-'-9 e CET RUN t ,...:.~':'" RUN Fi'.Ui,.I t , 5" RUN t, 5 ' RUN t, 5" R U i',! RLJN t, 5:" R U N R U N RUN RLJN t, 5" RUN ~ , 5 ' R LJ N R U N R U N RUN F'LEASE SIGN AND REI'URN TFIE ATTACHEI) CC)PY AS F(EC;FIF:'I' C)F DATA. SCH A'T' L. A ,S' A'i' I.. A,S' A 'i' I.~ A,., ~'' A "i' L A,S' ,'!;' C I..I HI... ;:.'; I..1 I...,S' I..IL.,S' SCH ,S'CH SCI.] S C H RECEIVED BY A'FO-t 5~9 Naska 011 & Gas Cons. Commission chorage DISTRIBUTION ..-'"- CENTRAL FII_ES ,.'"'PHILLIPS ~'~-CHEVRC)N F'B WELL F:'ILES D & M R & D · -~"EXTENSION EXPLORAI'ION ...'"' BPX · ,~ EXXON .,'~ STAI'E OF ALASI<A MARAI'HON I'EXACO · ~ MOBIL * I'HE AF'I~: F:'OR t.5-i i I$ 50-'029-'206':~3, D A 'T' !ii: · 4 - '2 4 .-. ? 0 RtE F:' E R E N C E · A R C: 0 D I R E C: T I 0 N A t... D A'I" A W 61 .... 8 4 - ~'.; - 9 (') M W D D I R Ii:.' C'T' t 0 N A I .... ? !.J R V E Y M W D D I R Ii.=. C 'r ! 0 N A I... ,'...; I.j R V Ii-" Y J 0 B :,~: 7 ]:: t P I... Iii:" ~'' , ..................... ~.l,.:. E 9 ! .G N A N D t:(' E'.'."l" U R N T H F.!: A T T A C I"t Iii: D r'. f't P v' A,? R I::' f': E:' I P 'T' f'i F' .1:.) A T A,. R E C'. Ii!: I V E D B Y ........... . .,,X'E..~..~...._... ..... t..IA V E A N I C r_...". D A Y ! ;:"," A t... L. Y I"10 F:' F:' E: C: I( E] R A T 0 .... i ~ 2 9 D 12 T R I B U'I' I 0 N CENTRAl_ F I I... IE,~.¢ C 1..! E V R 0 N · ,.'"' E X 'T' E'. N.,S' I 0 N E: X F:' L.. 0 R A "f' :t: O. N · .. IE X X 0 N MARATHON MOBIl... F'I-.! ;[ L.. L. I F',.9 ~: P B WEI...I... FILE2 (2 COF'IE. 2) R & D '"' B P X 'il" · ,~ 2TA'/E 01:: AL. A2KA 'f' E X A C 0 ARCO ALA~'KA~ INC· P ~ 0 · BOX ANCHORAGE ~ ALASKA 99~0 DATE~ 4-~ 2-9~ F;~I~i:F:'ERE. NC;E' ARCO CA,S'E:'D HOL. E F:'INAL.$; ~ -'L"> S--3 ~ -..o0 F:'E:RF:' kECORD 2-9 ~-22-89 F'ERF RECORD S .... S S'"':JO""9.0 PERF DEPTFI RE:CORD S-23 4-~-90 F'ERF RECORD S""24 4-4-90 PERF F~'.EC ORD 4'-5 ~'-~2-'89 PERF RECORD 7""2 ~ 4 0-'30""89 TEEMF:' 9-29 4-7-90 COLLAR/F'ERF ~2-~0 ~i-~7-89 PERF RECORD PWDWi -2 4-7-90 CBT PWDWi-2 4-7-90 CEI' WGI-6 3-2'7-90 CBT W (; I - 6 3 - 2 '7 - 9 (.) C E T PI_EASE SIGN AND RETURN THE ATTACHED COPY R E C E: I V E I) B Y _ .~..: ............................................ HAVE A NICE DAY, RECEIVED ,S'ALI..Y FIE)FFE~CKE~R ATO.-t 529 APR 1 8 1990 AI.km 011 & Gms Cons. Commis~lon Anchorage DISTRIBUTION CENTRAL FILES .CHEVRON D&M EXTENSION EXPLORATION EXXON MARATHON MOBIL RUN RUN RUN RUN RUN RUN RLJN RUN RLJN RUN RLJN RUN RLJN i .i i, i, i, i, i, i, i, i, AS RECEIPT OF' DATA, · ,,.'"' F'H ILL I F'..S" PB WELL. F'ILES R & D ~ BPX · ~ STATE OF' ALASKA TEXACO 5" 5" 5 ' 5" 5 ' 5' 5" 5' 5" 5' 2'&5' 5' ~'CI"I HL~,~ .? C H $ C I"1 ,S'CFI I"!1...,~ I"IL,S' A'FI_A;~" I'-IL.,.$' SCH ,.~Cf'l SC.'FI STATE Of ALASKA AI_~oKA OIL AND GAS CONSERVATION COMMISSION 0 APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon _ Suspend _ Alter casing _ Repair well Change approved program _ Operation Shutdown ~ Re-enter suspended well _ _ Plugging _ Time extension _ Stimulate _ Pull tubing_ Variance _ Perforate _ Other 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At top of productive interval 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At effective depth 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM .. At total depth 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) RKB 30' 7. Unit or Property name Prudhoe Bay Unit 8. Well number PWDW1 9. Permit number 90-3,~ 10. APl number 50-029-220;~4 11. Field/Pool Cretaceous/Undefined 12. Present well condition summary Total Depth: measured true vertical 6005' feet 6005' feet Plugs (measured) None Effective depth: measured true vertical 5900' feet 5900' feet Junk (measured) None Casing Length Size Structural Conductor 8 0' 2 0" Surface 3435' 1 3-3/8" Production 59 58' Liner Perforation depth: measured 9-5/8" None true vertical None Tubing (size, grade, and measured depth None Packers and SSSV (type and measured depth) None Cemented Measured depth True vertical depth 2850# Poleset 1 12' 2000 sx CS III & 3467' 600 sx Class G - Top job w/250 sx CS II 300 sx Class G 5 988' 112' 3467' 5988' APR 1 8 .8iJ.& ~as Cons. Commissior~ ~ Anchorat~ 13. Attachments Description summary of proposal _ Well Histo 14. Estimated date for commencing operation May 7. 1990 16. If proposal was verbally approved 17. 15. Detailed operation program_ Status of well classification as: Oil Gas BOP sketch Suspended Name of approver Date approved I hereby certify that the foregoing is true and correct to the best of my knowledge. Service Produced Water ned Title Drilling Analyst FOR COMMISSION USE ONLY Date Conditions of approval: Notify Commission so representative may witness Plug integrity_ BOP Test_ Location clearance__ Mechanical Integrity Test_ Subsequent form require IlAppr°val No.~'~ ~ the order of the Commission Form 10-403 Rev 06/15/88 ORIGINAL SIGNED BY I,~NNIE C. SMITH Commissioner SUBMIT IN TRIPLICATE Approved COpy Retur:~ed .A. ARCO, and Gas Company Well History - Initial Report - Daily Instructions: Prepare and submit the "l.ltill Rol~rt" on the first Wednesday after a well is spudded or workover operations are started. Daily work prior to spudding sho~lld be summarized on the form giving inclusive dates only, District ARCO A.~II~S~[zl~ TNC. ICounty, parish or borough I Field PRUDHO~- BaY JLease or Unit I Auth. or W.O, no. AS3536 ITM I Operator ARCO Spudded or W.O. begun SPUD IDate Date and depth as of 8:00 a.m. 03/1.( TD: SUPV 03/2( TD: i S UPV: 03/2; TD: ~ SUPV: 03/2; TD: ~ SUPV: 03/2~ TD: ~ SUPV: 03126 TD: 6 SUPV: NORTH SLOPE ADL: 28326 ISlate IWell AK no, PWDW1-2 DRILL API: 50-029-22024 Complete record for each day r~RS 28E J ARCO W.I. 03/1~0 23: l~ri°r status if a w'°' 21.7 /90 ( 1) 514'( 514) MRC /90 (2) 645' (1131) MRC /90 (3) 077' (1432) MRC /90 (4) 500' ( 423) MRC /90 ( 5) 500' ( 0) . 599':(99) MRC 90 (7) 52' (1653) YtRC /90 ( 8) 005' ( 753) MRC DRILLING AT 514' 20"@ 112' MW: 8.8 VIS:300 ACCEPT RIG @ 1600 HRS, 3/18/90. NU DIVERTER AND MIXED SPUD MUD P/U BHA. SPUDDED AT 2300 HRS 3/_~18/9. Q. DRILLED F/122-514'. DAILY:S33,459 CUM:$33,459 ETD:S33,459 EFC:$1,650,000 DRILLING AT 1645' MW: 9.1 VIS:280 DRILLED TO 634'. CHANGED SWIVEL PACKING. DRILLED TO 1645' DAILY:S120,278 CUM:$153,737 ETD:S153,737 EFC:$1,650,000 TRIP FOR BIT #2 MW: 9.2 VIS:192 DRILLED TO 3077'. CBU. TRIP FOR BIT. DAILY:S42,406 CUM:$196,143 ETD:S196,143 EFC:$1,650,000 PERFORMING TOP JOB 13-3/8"@ 3467' MW: 9.3 VIS:172 WIH W/ BIT #2. DRILLED TO 3500'. ST CBU. POH. RAN 3500' 13-3/8" 68# L-80 BTC CSG. CIRC. CMT'D W/ 2000 SX CSIII AND 600 SX CL G. CIP AT 0500 HRS 3/22/90. PERFORMING TOP JOB. DAILY:S306,500 CUM:$502,643 ETD:S502,643 EFC:$1,650,000 CHANGING OUT BOP 13-3/8"@ 3467' MW: 9.3 ViS: 40 PUMPED 250 SX CS II TOP JOB. CUT OFF CSG. WELD ON STARTERHEAD. NU BOPE. TOP RAMS LEAKING. CHANGED SEALS-STILL LEAKING. CHANGING OUT TOP RAM BODY. DAILY:S163,252 CUM:$665,895 ETD:S665,895 EFC:$1,650,000 DRILLING AT 3599' 13-3/8"@ 3467' MW: 9.3 VIS: 40 ND FLOWLINE. NU BOPE. TEST SAME TO 5000 AND 3000 PSI. BU BIT # 3 AND RIH. TAG CMT AT 3376'. TEST CSG TO 2500 PSI. OK. DRLD CMT, FC AND CMT TO 3455'. TEST CSG TO 2500 PSI. OK. CMT FS AND 10' NEW HOLE TO 3510' LOT TO 15.1 PPG EMW. DRLD F/ 3510' TO 3599'. DAILY:S61,748 CUM:$727,643 ETD:S727,643 EFC:$1,650,000 DRILLING AT 5252' 13-3/8"@ 3467' MW:ll.0 VIS: 39 DRLD F/ 3599' TO 5252' DAILY:S86,739 CUM:$814,382 ETD:S814,382 EFC:$1,650,000 POOH 13-3/8"@ 3467' MW:ll.0 VIS: 44 DRLD TO 6005'. TRIP FOR BIT. TIGHT AND SWABBING. RUN BACK IN HOLE. CIRC 4 PPB NUT PLUG SWEEP. POOH. DAILY:S57,688 CUM:$872,070 ETD:S872,070 EFC:$1,650,000 The above is correct ' t Signat~.~~ For form p?eparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-1-D INumber all daily well history forms consecutively ss they are prepared for each well. iPage no. ARCO O, .... td Gas Company ~, Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number alt drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets unlil final completion. Report official or representative test on "Finel" form. 1) Submit "lnt®,im" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin[} until completion. District ARCO ALASKA INC. County or Parish NORTH SLOPE IState AK I Field PRUDHOE BAY Lease or Unit PWDW1-2 Date and depttl Complete record for each day while dr~l~rko~'J~n progress as of 8:00 a.m. 03j TD: SU~ 03, TD SU! 27/90 ( 9) 6005' ( 0) V:DAC/TJ 8/9O (10) 6005'( 0) V:DAC/TJ RIH W/9-5/8" CSG 9-5/8"@ 5988' MW:ll.2 VIS: 44 POH, PUMP OUT OF HOLE 4402-3700', POH TO SHOE, RIH, CBU, POH, STABS BALLED UP, R/U SCHLUMBERGER, RUN GR/CALIPER 5991' ELM, M/U BIT AND RIH, 10' FILL, WASH TO 6005', CIRC HI-VIS , SWEEP AROUND, POH L/D BHA, PULL WEAR RING, CHANGE TOP RAMS TO 9-5/8, TEST DOORS TO 3000, R/U RIH W/ 9-5/8" CSG. DAILY:S203,856 CUM:$1,075,926 ETD:S872,070 EFC:$1,853,856 POOH 9-5/8"@ 5988' MW:ll.3 VIS: 46 RIH W/9-5/8 CSG TO 5988, LYNES ECP AT 4982, HOWCO HOSS STAGE COLLAR AT 4919, LANDED CIW GEN IV HANGER, CIRC MUD, PUMPED SPACER, PUMPED CMT (300 SX CLASS G), DISPLACED CMT AND BUMPED PLUG, ATTEMPTED TO SET LYNES ECT AND OPEN HOWCO HOSS STAGE COLLAR AND SAW NO INDICATION OF EITHER TOOL WORKING, INCREASED PRESSURE AND DROPPED A HOWCO BOMB AND TOOL DID NOT SHIFT OPEN, BLED OFF PRESSURE, L/D LAN-DING JT, N/D DRILLING SPOOL, TESTED SEALS, N/U BOP AND PRESSURE TESTED, P/U MULESHOE AND RIH, CBU, SLACKED OFF ON STAGE TOOL AND SHEAR PINS BROKE, ATTEMPTED TO CIRCULATE DOWN DRILL PIPE AND UP CSG ANNULUS, NO SIGNS OF CIRCULATION, CIRC., POOH TO PICK UP 8-1/2" MILL. DAILY:S92,993 CUM:$1,168,919 ETD:S1,100,000 EFC:$1,718,919 The above ia correct ~. For form prepa~l'ation and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 Oate,~ ~ ITitle Drilling Supt. AR3B-459~2-B Number ail daily well history forms consecutively as hey are prepared for each well. IPage no. ARCC .~il and Gas Company Daily Well History-Final Report Instructions: Prepare and aubmit, th~ '~F~.i~l~. ~[,t" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned or Sold. "Final Report" should be s~bm!tt~.:~al~.~l~ll. ~raflon~,~are Suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, repOrt c~l~l~!~:~J~fN'eaentatlve test data in blocks provided, The "Final Report" form may be used for reporting the entire operation if space is available~::-::.~:..:~;. ?~: Accounting cost center code District ARCO A~SKA INC. PRUDHOE BAY Field ICounty or Parish NORTH SLOPE Lease or Unit ADL: 28326 Title DRILL State AK no. PWDWi-~ Auth. or W.O. no, AS3536 Operator Spudded or W.O. begun Date and depth as of 8:00 a.m. ~CO w.I. I A.R.Co. SPUD IDate !Complete record f ..... h day re]~Lr~r~)RS ~8E API: 50-029-22024 0) 2, ~'p,t,a,l~,nurnber of wells (active or inactive) on thisI · ~ · l~c'~l~l~enter prior to plugging and labandonrnent of this well J 03/~"~u/9 0 23 :l~r6or ,,a,us ,, a w.o. PREPARING FOR RIG MOVE 9-5/8"@ 5988' MW:ll.1 VIS: 0 P/U MILL, CUT DRILL LINE, RIH WITH MILL TO STAGE DOOR, CLOSE STAGE DOOR, TEST CSG, DRILL HOSS STAGE COLLAR, RIH AND TAG HOWCO BAFFLE COLLAR @ 5892', CBU, REVERSE CIRCULATE, TEST 9-5/8" CSG, POOH L/D DRILL PIPE, N/D FLOWLINE/HYDRILL/ BOP, INSTALL DUMMY HANGER AND TEST PLUGS-TEST PLUG WILL NOT SEAT PROPERLY, N/U XMAS TREE AND TEST TO 3000#, INSTALL BACK PRESSURE VALVE AND FREEZE PROTECT 13-3/8 X 9-5/8" ANNULUS W/ 185 BBLS 50/50 DIESEL/CRUDE MIX. RR @ 0400 HRS, 3/29/90. DAILY:S34,484 CUM:$1,203,403 ETD:S1,100,000 EFC:$1,718,919 03/~9/90 (11) TD: 6005' ( SUP%~: MRC , .. OIdTD I! New TO J I ps Depth Released rig Date JKind of rig Classifications (oil, gas, etc.) J Type completion (single, dual, etc,) Producing method J Official reservoir name(s) Potential test data Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected For form prep~a'~ation an; distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C INumber all daily well history forms consecutively es they ere prepared for each well. Page no. DIvlM~ of AllantlcRIcMletdCompa~y A I::~ C' O ALAS'KA F'. 0 · BOX i ANCHORAE;F, ALASKA 995 ~ ¢~ DATE: 4-4-90 REFERENCE: ARCO OPEN HOLE FINALS .,--,..~ t(l/")S-;5t/89.,_ EWR/DGR RUNS t-ti, ~.')"&S'I'VD 5-'.~7 i~/2~-Si/89 DGR/CNF'/,SI~"D R~N,~ i'-it 2 &5 '¥VD WGZ-6 S/ie-i4/9~ GR RESISTIVITY RLIN ':.). , ,..'~'TVD W(.;I-6 3/i~,")-t4/9~ GR RES'ZSTIVITY RUN '?, 2' F'WDWt.-"'2 S--':26-9¢ CALIPER-GF~ RUN i , 2' F'WDWt-2 S--26-9¢ CAI_IPER-GR RUN i, 5" PI_EASE SIGN AND RETURN TFIE ATTACHEI) COPY AS RECEIF'T OF DATA, HAVE A NICE DAY! APR - 6 1990 SALLY HOFFECKER . · F'F'ROVED ,,.,'//r-- A'l' O- t 5 2 9 Aiaska Oil & Gas Cons. CommtsstO- R A N S' :~ ? 0 T ~ ~-' AnchOrage Nt_ S F' li-- NL. SF'E AMA AMA ,.'.. U I"1 ~ C I"t DISTRIBUTION · ,-'" CENTRAL FILES ,-~ PHILLIPS ~ CHEVRON PB WELL FILES ~- D & M ~- ~ R & D ~ EXTENSION EXF'LORATION ~ ~ BF'X ' EXXON '" STATE OF ALASKA 81' '*~ MARATHON ~" TEXACO ' MOBIL OIL AND GAS CONSERVATION COM 31ON ~ ~ APPL,,-,ATION FOR SUNDRY APPROVAL'S' 1. Type of Request: Abandon 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK _ Suspend _ Operation Shutdown _ Re-enter suspended well _ Alter casing ~ Repair well _ Plugging _ Time extension _ Stimulate _ Change approved program _ Pull tubing ~ Variance _ Perforate _ Other 6. Datum elevation (DF or KB) 99510 4. Location of well at surface 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At top of productive interval 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At effective depth 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM At total depth 762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM 5. Type of Well: Development _ Exploratory _ Stratigraphic _ Service _X RKB 3O' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number PWDW1-2 9. Permit number 90-33 10. APl number 50-029-22024 11. Field/Pool C retaceo us/U ndefi ned 12. Present well condition summary Total Depth: measured true vertical feet Plugs (measured) feet Effective depth: measured true vertical feet Junk (measured) feet Casing Length Structural Conductor Surface 3468' Intermediate Production Liner Perforation depth: measured Size 13-3/8" true vertical Tubing (size, grade, and measured depth Packers and SSSV (type and measured depth) Cemented Measured depth True vertical depth 3500' 3500' A change in the 13-3/8" surface casing depth from 3000' MD/TVD to 3500' MD/TVD is requested. This change will improve the fracture gradient atj~E C E 13-3/8" casing shoe. 13. Attachments Description summary of proposal _ Detailed operation program_ BOP 14. Estimated date for commencing operation 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil __ Gas _ Suspended Service Produced Water Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~]rf~ [~,Onu/}'~J ~ J, i,'%"~./ Title Drillin~ Analyst /) FOR ~MMISSION USE ONLY Date Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance~ Mechanical Integrity Test__ Subsequent form require Approved by the order of the Commission ORIGINAL SIGNED BY LONNIE 6. SMITH 10-,4,~ 7 Commissioner IApproval No~,~ I DJ) Form 10-403 Rev 06/15/88 Approved Copy Returned . . __ SUBMIT IN TRIPLICATE March 13, 1990 Telecopy No. (907) 276-7542 J D Giliespie Regional Drilling Engr ARCO Alaska, Inc ? 0 Box 100360 Anchorage, AK 99510-0360 Re: PrudhOe Bay Unit PWDW 1-2 ARCO Alaska, Inc Permit # 90-33 Surf Loc 762'FSL, 252'FWL, Sec 31, T/iN, R15E, UM Btmhole Loc 762'FSL, 252'FWL, Sec 31, TllN, R15E, UM Dear Mr Giliespie: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative o~ the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. V~y~ trul.~ yo3~-~s, ..... ~ .~ ." ? ..... /." / ../... .~ ~: Chai~an Alaska Oil and Gas Conservation Co~isslon BY O~ER OF THE COMMISSION jo Enclosure Department of Fish & Game, Habitat Section - w/o encl Department of Environmental Conservation - w/o encl --,, STATE OF ALASKA ~ ALASKA L AND GAS CONSERVATION Ct ,MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill ~' Redrill 5[ lb. Type of well. Exploratory ~ Stratigraphic Test ~ Development Oil Re-Entry - Deepen'~1 Service i~' Developement Gas L--_ Single Zone ~ Multiple Zone 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 762'FSL, 252'FWL, Sec.31, TllN, R15E, UM At top of productive interval 762'FSL, 252'FWL, Sec.31, TllN, R15E, UM At total depth 762'FSL, 252'FWL, Sec.31, TllN, R15E, UM 12. Distance to nearest ~ 13. Distance to nearest well property line j PWDW 1- 1 252 ' feet 12 ~ O ' feet 16. To be completed for deviated wells 3/4 o Kickoff depthN/A feet Maximum hole angle 0 18. Casing program size Weight , 94.5# 68# 47# Specifications Grade ! Coupling i Length iH-40 I Weld J 80' , Hole Casing 20" 17-1/2" 13-3/8" 12-1/4" 9-5/8" 5. Datum Elevation (DF or KB) 30 ' RKB feet 6. Property Designation ADL ~ '.~',g'~_, ~' 7. Unit or property Name Prudhoe Bay Unit 8. Wellnumber PWDW 1-2 9. Approximate spud date 03/13/90 14. Number of acres in property 10. Field and Pool Cretaceous Pool Undefined 11. Type Bond Isee 2o AAC 25.025) Statewide Number No. U-630610 Amount $200,000 2490 17. Anticipated pressure (see 20 AAC Maximum surface 2 2 8 0 psig At total 19. To be completed for Redrill, Re-entry, and Deepen O Present well condition summary Total depth: measured feet ti'ue vertical feet Setting Depth Top Bottom MD ! TVD I MD ] TVD 30' 130' I 110' I 110' 30, 130, 13000,1 )orations. Plugs (measured) 15. Proposed depth (bid and TVD) , 6600'TVD/MD ,,, feet 25.035 depth O'VD) 2 9 4 0 i psig Quantity of cement (include stage data) 2000# Poleset 3000' 1800 sx AS III,600 sx 6600' 2200 sx AS III,1000 sx Effective depth: measured feet true vertical feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size measured true vertical Junk (measured) Cemented Measured depth True Vertical depth RECEIVED MAR -'1 1990 Alaska 011 & Ga~ ~.~. GommigSlO~ Anchora§m L G G 20. Attachments Filing/fee ~ Property plat [] BOP Sketch ~,- Diverter Sketch-~' Drilling program ~ Drilling fluid program ~Time vs depth plot [] Refraction analysis [] Seabed report ~ 20 AAC 25.050 requirements 21. ! hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title ~'~'~"=_! Drilling Eng!ncer Commission Us~ O~n~¢-- (JPS) PD 3 / ] 07 ~ ~i/* [ O3/J. 3/90 Isee ~'°ver letter Permit Number APl number Appro.val date_ ~/,-~ -.- .~._ ~' 50-- O~--. ~ "' 'Z-- ~.0 ~.. ~/ for other requirements Cond,¢tio'-'~s of approval Samples required ~ Yes ~No Mud Icg required L-] .Yes. ~ No Hydrogen sulfide.measures iq Yes ,.~No Dir. ectional survey required [] Yes~N o Required working~r.~ssur¢'jorB.,OPE') E~2M; .~NI; E35M; [] 10M; [] 15M Other: //~ //~~ by order of Approved byL_~.,.,~. ~..,.~~~ Commissioner the commission Form 10-401 Rev. 12-1-85 Date 3-./-_~¢_9- OPERATIONS SUMMARY 1. MIRU ddlling rig. NU diverter and function test same. 2. Spud well and drill 17-1/2" hole to" 3000' TVD /MD. 3. Set 13-3/8" casing and cement same. Nipple up BOPE and test to 5000 psi. Test casing to 2500 psi for 30 minutes. 4. Pick up 12-1/4" BHA and GIH. Drill 10 ft of new hole and perform leakoff test. 5. Ddll a straight 12-1/4" hole to 6600' TVD/MD. 6. Run wireline logs as programmed. 7. Run 9-5/8" casing and displace cement with brine. 8. Test casing to 3000 psi for 30 minutes. 9. Release drilling rig. Run cased hole logs 7 days after rig release. 10. MI and RU completion rig. Run 7" tubing and packer assembly. Test tubing casing annulus to 3000 psi for 30minutes. Notify the AOGCC so a representative can witness the casing integrity test. 11. N/U 7" tree and test to 3000 psi. Release completion rig. 12. Rig up wireline unit and perforate. NOTE; a. The 13-3/8" x 9-5/8" annulus will be left with a non-freezing fluid during any extended period. The annulus will be sealed with 300 sx of cement followed by Artic Pack. b. No existing wells are within 200 ft. of the proposed well. c. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.033. d. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/fi). e. Based on the logs from PWDW 1-1, no potential productive zones are anticipated above 3000' TVD. f. No potential hazardous levels of H2S are anticipated in this well. RECEIVED MAR - 1 1990 Alaska Oil l Gas Cons. Commtsst~ Anchorage PWDW 1-2 MUD PROGRAM DEPTH DENSITY VIS YP INT 10MIN FL OIL SOLIDS MUD (TVD) (PPG) GELS GELS CC/30MIN (%) (%) TYPE SPUD 8.8 300 70 30+ 50+ 25 0 2 GEL-BENEX to to to to to SPUD MUD 13-3/8 9.2 100 40 6 csg pt. SET 13-3/8" CASING DEPTH DEN- PV YP INT 10 min FL OIL SOLIDS MUD SITY (TVD) (PPG) (CP) (#/ft GEL GEL cc/30min (%) (%) TYPE 13-3/8" 9 10 6 2 4 25 0 2 LIGHTLY to to to to to to to to to TREATED 5400 9.5 15 10 4 10 15 6 POLYMER 5400 9.5 10 6 2 4 15 0 2 LIGHTLY to to to to to to to to to TREATED 9-5/8" 9.7 15 10 4 10 6 5 9 POLYMER csg pt. SET 9-5/8" CASING NOTE: 1. THIS MUD PROGRAM IS ONLY A GUIDELINE. ACTUAL HOLE CONDITIONS WILL DICTATE THE ACTUAL MUD PROPERTIES. Naska O~ & Gas Cons. 'AnChorage 13-5/8" 5000 psi BOP STACK DIAGRAM ,I IPE RAM [~~LIND RAMS]~~ SPOOL SPOOL BRADEN HEAD ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVIOR TO THE PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT THE ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH THE CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRES- SURE. 13-5/8" STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH A NON-FREEZING FLUID. 2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED. MARK THE RUNNING JOINT WITH PREDETERMINED PLUG SEATING DEPTH. RUN THE TEST PLUG ON DRILL PIPE AND SEAT IN WELL- HEAD. 3. CLOSE ANNULAR PREVENTER AND UPSTREAM VALVES. 4. FUNCTION TEST CHOKES. 5. IN EACH TEST, FIRST HOLD 250 PSI FOR 3 MINUTES PRIOR TO THE HIGH PPRERSSURE TEST. 6. INCREASE PRESSURE ON ANNULAR TO 3000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 7. OPEN ANNULAR PREVENTER AND CLOSE TOP PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 8. CLOSE VALVES DIRECTLY UPSTREAM OF THE CHOKES AND OPEN CHOKES. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 9. OPEN TOP SET OF PIPE RAMS. CLOSE BOTTOM PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 10. TEST REMAINING MANIFOLD VALVES (IF ANY) WITH 5000 PSI UPSTREAM OF THE VALVE AND ZERO PRESSURE DOWNSTREAM. 11. BLEED PRESSURE TO ZERO. OPEN BOTTOM PIPE RAMS. 12. BACK OFF RUNNING JOINT AND POH. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 3 MINUTES. 13. BLEED OFF ALL PRESSURE. OPEN BLIND RAMS. FILL MANIFOLD MAR -1 1990 A chomge AND LINES WITH NON-FREEZING FLUID. SET ALL VALVES IN THE DRILLING POSITION. 14. TEST STANDPIPE VALVES TO 5000 PSI. 15. CHECK DEGASSER OPERATION. 16. RECORD BOP TEST INFORMATION ON THE BOP TEST FORM SIGN AND SEND TO DRILLING SUPERVISOR. 17. PERFORM COMPLETE BOP TEST WEEKLY AND FUNCTION TEST DAILY. NABORS 28E DIVERTER SYSTEM ARCO ALASKA, INC. FILL-UP LINE RISER FLOWUNE I 20" 2000 P~ DIVERTER I 10" BALL VALVE L,. I 1 CONDUCTORI I 10" BALL VALVE I NOTE: ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND VENT LINE. THE SECOND VENT LINE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS RECEIVED THIS IS A VARIANCE FROM 20AAC25.035. RESERVE PIT 10" VENT LINE I_o_1 10" VENT UNE DIVERTER LINES DISCHARGE 100 FT. FROM RIG IGNITION SOURCE. ALL TURNS ARE TARGETED TEES. MAR - 1 1990 Nasla 0il & Gas Cons. CommiSSiO. P Anchorage NABORS 28E SYSTEM PIT #1 130 BBLS PIT #2 81 BBLS PIT #5 117 BBLS PILL PIT 20 BBLS PIT #6 135 BBLS TRIP TANK 170 BBL$ PIT #3 137 BBLS PIT $4 17 9 BBLS EQUIPMENT - DRILLING FLUID SYSTEM (3) DERRICK FLO-LINE CT.~.ANER (1) DERRICK MUD CLEANER (1) BRANDT CF-2 CENTRIFUGE (1) PIONEER MARK I CENTRIFUGE (1) RIG BUILT GAS BUSTER (1) DRILCO DEGASSER (1) PVT SENSOR PER PIT w/ visual and audio warning devices (1) AGITATOR PER PIT (1) DRILLING FLOW SHOW SENSOR W/ readout convenient to the driller's console MAR-1 1990 Alaska 0il & Gas Cons. comm~SSl~ 'Ancfiom~e CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE (1) Fee ~ (2) Loc (~2qhru 8~ (8) , _ (10 and 13) (4) Casg .,~-~.~..,~, ~-7-~'r_) (14 thru 22) Comp any ./~z- ~ 1. Is the permit fee attached .......................................... (5) BOPE (23 thru 28) Lease & Well No. YES NO -4-_ -- 2. Is well to' be located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ...................... e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Does operator have a bond in force .................................. .. f Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... ~ Does the well have a unique name and number ......................... ~ Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground, source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old we!lbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate Are necessary diagrams and descriptions of diverter and BOPE attached. ~ Does BOPE have sufficient pressure rating - Test to ~O~P psig .. Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. (6) Add: Geology :~ DWJ~ Engineering: LCS -- i_::, .- rev: 01/30/89 6.011 For 29. 30. 31. 32. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements ............................................. ~ Additional Remarks: INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE