HomeMy WebLinkAbout190-033ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
January 11, 1999
Ms. Wendy Mahan
Alaska Oil & Gas Conservation Commission
3301 Porcupine Drive
Anchorage, Alaska 99501-3192
Re: PWDW Well Work Activity
Dear Ms. Mahan:
Attached is a well work history for each of the ARCO operated Prod~_u. ced_Water
Disposal Wells as you requested. If you require additional information or
clar~lease contact Bill Mathews at (907) 263-4607.
Sincerely,
Injection Engineer
Attachments
RECEIVED
JAN 12. 1999
Alaska Oil & Gas Coils. Commission,
Anchorage
SCANNED DEC ~L 9 2002
ARCO Alaska, Inc. Is a Subsidiary of AtlanticRIchfleldCompany
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
OCTOBER 27, 2000
E
E
C:LO1CI~MFILM.DOC
PL E W
M A TE R IA L U N D ER
TH IS M A.R K ER
~o- 0'5"5
PWDW1-2
Well has been abandoned.
Date
06/11/90
06/11/90
06/20/90
06/29/90
O7/O5/9O
07/12/90
07/18/9O
07/19/90
O7/21/90
O7/22/9O
O8/O6/9O
Well Event
Shot 114' of initial perforations (4130'-4220', 4406'-4430')
SBHPS- 1991 psi @ 4400'.
Passed 9-5/8" MIT.
Ran baseline TEMP. Indicated a channel up which allowed water to
travel around 13-3/8" shoe to surface.
Attempted remedial squeeze, but only able to leave cement plug with top
@ 4075'.
13-3/8" injectivity test of 0.9 BPM @ 2000 psi.
13-3/8" injectivity test of 2 BPM @ 3000 psi.
Placed cement plug @ 4000'CTM.
TEMP and 13-3/8" injectivity test of 0.78 BPM @3000 psi.
Tubing injectivity test of 2 BPM @ 1500 psi.
Well abandoned.
PLUGGIN"~ ~& LOCATION CLEAi_~/NCE REPORT
State of Alaska
.ALASKA OIL & GAS CONSERVATION COHMISSION
..
Memcrand'~.m To File:
Zbnd Date ~ '
Comp!etad ~ '
/b
Note casing size, wt, depth, cmt vol, & orocedure.
Review the well file, and' comment on plugging, well head
sUatus, s~d location clearance - orovide loc. clear, code.
Harker ~os= or
Location Clear~c~:
Code
Signed
Date
· ·
STATE OF ALASKA
ALA~,,''~ OIL AND GAS CONSERVATION OCr, ..... 3SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG ",- '¥
1 Status of Well Classification of Service Well ,
OIL r'~ GAS r'-] SUSPENDED r-'] ABANDONED r~] SERVICE [~
/
2 Name of Operator 7 Permit Number
ARCO Alaska, Inc 90-33
3 Address 8 APl Number
P.O. Box 100360, Anchorage, AK 99510-0360 50-029-22024
4 Location of well at surface 9 Unit or Lease Name
761' ESL, 252' FWL, SEC 31, TllN, R15E UM PRUDHOE BAY UNIT
At Top Producing Interval r~o.~~ ~t~.~..~_~;:~ ~ 10 Well Number
728' FSL, 261' FWL, SEC 31, TllN, R15E UM J iiS~f PWDW1-2
At Tota, Depthi,,,,,,~-~~~' .~..~:~ 11 F'ie,dandP~o,
CRETACEOUS/UNDEFINED
730'FSL, 259'FWL, SEC 31, T11N, R15E UM i !'rial
5 Elevation in feet (indicate KB, DF, etc.) 6 Lease !~_-~- _ _'
No.
RKB 62' ADL 28326
12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. 15 Water Deplh, if offshore 116 No. of Completions
03/18/90. 03/25/90. Oa,/.L-q9/9~ N/A feet U SLI 1
17 Total Deplfl (MD+'FVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey J20 Depth where SSSV set'1 21 Thickness of permafrost
6005' MD/TVD 3474' MD/TVD YES ~ NO r'-II 2223, feet MDJ 1900' (approx)
.
22 Type Electric or Other Logs Run
GR/CAL, CCL, CET/CBT, GCT
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP Bo]roM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
,,,
20" 91.5# H-40 SURF 112' 30" 2850# POLESET
13-3/8" 68.0# K-55/L-80 SURF 3467' 17-1/2" 2000 SX CS Ill & 600 SX CLASS G
TOP JOB W/250 SX CS II
,
9-5/8" 47.0# L-80 SURF 5988' 12-1/4" 300 SX CLASS G
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
7" 3263' 3200'
NONE OPEN TO PRODUCTION
,
26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
DEPTH INTERVAL (MD) .. AMOUNT & KIND OF MATERIAL USED
__
4448'-4450' (8/90 10-407 RPT) 750 SX CLASS G & 24 BBL MSR-100
ACID
PERES F/4136'-4434' 143 BBLS CMT (7/6/90**)
,PLUG F/3474'-4040' 79 BBLS THIXOTROPIC CMT
!RET @ 3067' (SQZ CSG HOLE) 200 SX CLASS G
27 N/A. PRODUCTION TEST PLUG F/4000'-4130' 24.5 BBLS CLASS G (7/19/90'*)
Date First Production IMethod of Operation (Flowing. gas lift, etc.)
I
,,,
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OiL RATIO
I
TEST PERIOD --
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE .~
Brief description of lithology, porosity, fractures, appe'rent dips and presence of oil, gas or water. Submit core chips.
NONE ~ ~','" "' '
:'
*NOTE: DRILLED RR 3/29/90. TUBING RUN 6/9/90. PERFORATED WELL 6/10/90. CTU SQUEEZE & PLUG PERFORMED 7/6/§0 & 7/19/90.
PLUG & ABANDONED WELL 8/29/90.
** DETAILS TO BE SUBMITTED BY OPERATIONS WITH FORM 10-404 (REPORT OF SUNDRY WELL OPERATIONS).
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
, ,
29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure dal:a, all fluids recoverd and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
UGNU SAND 5525' 5525'
UGNU C 5525'-5907' 5525'-5907'
UGNU B 5907'-5994' 5907,-5994' NONE
WEST SAK 5994' 5994'
:
:
? ·
,,
31. LIST OF A'I:TACHMENTS
P & A WELL HISTORY
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
..~:) ~ (~,~/~ J Title DRILLING ANALYST Date /~)' ~' ~
Signed
//
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
ARCO Oil and Gas Company
Well History- Initial Report - Daily
Instructions: Prepare and submit the "Initial RelX)l'l" o~1 the first Wednesday after a well ia spudded or workover operations are started.
Daily work prior to spudding should be summarized on the form giving inclusive dates only.
District
ARCO ALASKA !NC.
PRUDHOE BAY
Field
,
AS3846
Auth. or W.O. no.
JCounty. parish or borough
ANT,; 28326
Lease or Unit
Title W~U'~..I~ - PL'3~
APT: 50-029-2202~
State
A~
Operator
ARCO
ACCEPT
Spudded or W.O. begun
Date and depth
as of 8:00 a.m.
08/07/90 (
TD: 0
PB: 5893
SUPV: DCS/MD
08/08/90
TD: 0
PB: 5893
SUPV:MDD
08/09/90 (
TD: 0
PB: 5893
SUPV:MDD
08/10/90 (
TD: 0
PB: 5893
SUPV:TJ
.08/11/90 (
TD: 0
SUPV:DAC
The above is co~'rect~,
For form prep~aratlon and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
ARCO W.I.
IHour v,.~,.~,,~ .,']..,-t,,~ ~Prior status if a W.O.
I
21.7800
Date
NABORS ~ES
Complete record for each day reported
2)
3)
N/D .T~:~ 9-5/~,,e 59~, :-~; O.O N~Cl
MOVE RIG F/ DS 11-28 TO PWDW 1-2. ACCEPT RIG @ 03:30 HRS
8/7/90. PULL BPV. OBSERVE WELL, TBG & CSG PRESS - 0 PSI.
RESET BPV. N/D TREE.
DAILY:S106,005 CUM:$106,005 ETD:S106,005 EFC:$1,207,000
CHANGING RAMS 9-5/8"@ 5988' MW: 9.1NaC1
N/D TREE. TEST 9-5/8" PACKOFF TO 3800 PSI & 13-3/8" WELD TO
1500 PSI. N/U BOP. INSTALL 7" RAMS. PULL BPV. TEST BOP.
R/U WESTERN ATLAS, PERFORATE TBG @ 3119' - 3121.5', R/D
E-LINE. M/U LDG JT. CIRC 9.1 PPG NACL AROUND. BOLDS, PULL
TBG FREE, L/D HGR. POOH & L/D 79 JTS 7" TBG, SSSV & SEALS.
CLEAR RIG FLOOR. CHANGE RAMS TO 6" - 3-1/2" VARIABLE RAMS &
TEST SAME.
DAILY:S52,643 CUM:$158,648 ETD:S158,648 EFC:$1,207,000
RIH W/ MILL 9-5/8"@ 5988' MW: 9.1NaC1
FIN TESTING VARIABLE RAMS. INSTALL WEAR RING. M/U BHA #1
(MILL & PRT). RIH, SLIP & CUT, RIH. TAG PKR @ 3198' MILL
PKR TO 3200'. PULL PKR TO 3196', PKR STUCK, PRT PULLED OUT
OF PKR. POOH, L/D PKR & PRT, LOST (1) GRAPPLE IN HOLE. RIH
W/ BHA #2 (SPEAR). ENGAGE PKR & JAR FREE. POOH. L/D PKR &
TAIL PIPE ASSEMBLY, DID NOT RECOVER LOST GRAPPLE. M/U BHA
#3 (MILL). RIH.
DAILY:S44,005 CUM:$202,653 ETD:S202,653 EFC:$1,207,000
VISCOSIFYING FLUID 9-5/8"@ 5988' MW: 8.9 NaCl
RIH W/ MILL. TAG FILL / JUNK @ 3923'. MILL TO 3926',
LOSING FLUID @ 72 BBL/HR. CUT FLUID WT TO 9.0 PPG, LOSING
FLUID @ 60 BBL/HR, CUT FLUID WT TO 8.9 PPG, NO CHANGE IN
FLUID LOSS. CLEAN OUT TO 3941', FOUND CSG IS PARTED @
3931'. CIRC & COND, LOSING FLUID @ 60 B~/HR,~ERED
SAND IN CUTTINGS. COULD NOT WORK MILL BACK PAST 3931'
POOH. RIH W/ TAPER MILL. TAG @ 3927'. WORK THRU PARTED
CSG. CLEAN OUT CMT & SAND TO 4110'. PUMP 50 BBL HEC PILL.
CIRC & COND. BLED SURFACE CSG F/ 1850 TO 0 PSI. ATTEMPT TO
POOH, WELL U-TUBING. CIRC & COND, VISCOSIFYING WORKOVER
FLUID.
DAILY:S23,265 CUM:$225,918 ETD:S225,918 EFC:$1,207,000
RIH W/ STRING REAMER 9-5/8"@ 5988' MW: 8.9 NaCl
PUMPED 50 BBL HEC PILL, CHASED W/ VISCOSIFIED FLUID. PULL 2
STDS, HOLE TAKING FLUID. MONITOR t~EI.L & MiX "LIQ?ID C~"
LCM PILL. SPOT 53 BBL LIQUID CSG, LOSS RATE REDUCED. RIH,
TAG FILL @ 4040', CIRC ~ BPM, LOSING I BPM. POOH. P/U
STRING MILL & RIH. REAM TIGHT SPOTS @ 3399' & 3481'.
PUMPING 2 BPM, LOSING I BPM.
DAILY:S156,374 CUM:$382,292 ETD:S250,000 EFC:$1,339,292
AR3B-459-1-D
INumber ail dally well history forms consecutively
aa they are prepared for each well.
iPage no.
ARCO Oil and Gas Company ~,
Daily Well History--Interim
Instructions: This form iS used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed.
Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "interim" sheets until final
completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion.
State
NORTH SLO?~. AK
IWell no.
District County or Parish ARCO ALASKA INC.
Field Lease or Unit
PRUDHOE BAY PWDW 1-2
Date and depth Complete record for each day while drilling or workover in progress
as of 8:00 a.m. NABORS 2ES
6)
08/12/90 (
TD: 0
PB: 5893
SUPV:DAC
08/13/90 (
TD: 0
PB: 5893
SUPV:DAC
08/14/90 (
TD: 0
PB: 5893
SUPV:GTG
08/15/90 (
TD: 0
PB: 5893
SUPV:GTG/MI
08/16/90 (
TD: 0
PB: 5893
SUPV:GTG/M[
8)
9)
10)
POOH 9-5/8"@ 5988' MW: 8.9 NaC1
REAM THRU PARTED CSG @ 3927'. POOH, LOST 42 BBLS FLUID.
RIH W/ EZSV TO 4042' ATTEMPT TO SET, NO SUCCESS. POOH, EZSV
APPEARED TO HAVE GONE INTO OPEN HOLE. RIH W/ TAPER MILL TO
4118', HOLE VERY STICKY, MILL APPEARS TO HAVE GONE INTO OPEN
HOLE. POOH TO 3900'. AT.TEMPT TO ESTABLISH CIRC BETWEEN THE
13-3/8" X 9-5/8" ANNULUS, PRESSURE TO 1100 PSI W/ 3 BBLS.
POOH, WELL SWABBING, WORK PIPE, POOH, LOST 147 BBLS. RIH W/
RETRIEVABLE BRIDGE PLUG & SET @ 3788'. TEST CSG TO 2500 PSI,
OK. POOH.
DAILY:S26,452 CUM:$408,744 ETD:S250,000 EFC:$1,365,744
L/D 9-5/8" LDG JT 9-5/8"@ 5988' MW: 8.9 WBM
POOH. N/D BOPS & TBG HEAD. N/U DRLG SPOOL & BOPS. TEST
BOPS. RIH W/ RBP OVERSHOT TO 3782'. DISPLACE WELL TO 8.9
PPG WATER BASE MUD. INSTALL 9-5/8" RAMS. & TEST BONNET
SEALS. ENGAGE & RELEASE RBP. POOH. ATTEMPT TO PUMP DOWN
13-3/8" X 9-5/8" ANNULUS, PRESSURED UP TO 2500 PSI, NO
SUCCESS. BOLDS. M/U 9-5/8" LDG JT. ATTEMPT TO PULL 9-5/8"
CSG, PULLED UP TO 400K#. STRETCH CALCS SHOW CSG IS STUCK @
3120'-3220'. L/D LDG JT.
DAILY:S30,674 CUM:$439,418 ETD:S250,000 EFC:$1,396,418
POOH W/ SPEAR 9-5/8"@ 5988' MW: 8.9 WBM
RIH W/ 9-5/8" CSG CUTTER. CUT CSG @ 3088' POOH. M/U LDG
JT. PULLED & L/D 9-5/8" CSG RECOVERED 72 JTS & 24' STUB.
RIH W/ SPEAR & CSG CUTTER. CUT 9-5/8" CSG @ 3249'. ATTEMPT
TO PULL CSG, NO SUCCESS. RELEASED SPEAR. POOH.
DAILY:S31,618 CUM:$471,036 ETD:S250,000 EFC:$1,428,036
RIH W/ SPEAR 9-5/8"@ 5988' MW: 8.9 WBM
L/D CSG CUTTER & SPEAR. M/U 150' OF WASHPIPE & RIH. WASH
OVER 9-5/8" F/ 3088' - 3228' CBU. POOH. STAND BACK
WASHPIPE. CHANGE OUT KELLY. RIH W/ SPEAR & CSG CUTTER.
DAILY:S26,257 CUM:$497,293 ETD:S250,000 EFC:$1,454,293
WASHING OVER 9-5/8" 9-5/8"@ 5988' MW: 8.9 WBM
RIH W/ SPEAR & CUTTER. ENGAGE SPEAR. JAR ON CSG, NO
MOVEMENT. CUT CSG @ 3219' (40' ABOVE PREVIOUS CUT). ENGAGE
SPEAR & PULL CSG FREE. POOH, RECOVERED (2) FULL JTS & CUT
JTS. RIH W/ WASHPIPE. TAGGED TIGHT SPOT @ 3109' & REAM
THRU. TAGGED 9-5/8" @ 3219'. WASHING OVER 9-5/8"
DAILY:$27,$77 CUM:$524,870 ETD:S250,000 EFC:$1,481,970
ITitle
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
AR3B-459-2-B
Number all daily well hi~It6~r~'IO~'~ 'Cori~cuIively
as they are prepared or each well.
IPage no.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed.
Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final
completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2}
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion.
District JCounty or Parish IState
ARCO ALASKA INC. NORTH SLOPE
Field ILease or Unit
PRUDHOE BAY I PWDW 1-2
Complete record for each day while drilling or workover in progress
NABORS 2ES
Date and deptil
as of 8:00 a.m.
08/17/90 (
TD: 0
PB: 5893
SUPV:GTG/~
08/18/90 (
TD: 0
PB: 5893
SUPV:GTG/MI
08/19/90 (
TD: 0
PB: 5893
SUPV:GTG/M/
08/20/90 (
TD: 0
PB: 5893
SUPV:GTG/MJ2
08/21/90 (
TD: 0
PB: 5893
SUPV:GTG/M~
08/22/90 (
TD: 0
PB: 5893
SUPV:GTG/MI
11)
12)
13)
14)
15)
16)
AK
IWell no.
WASHING OVER 9-5/8" 9-5/8"@ 5988' MW: 8.9 WBM
WASH OVER 9-5/8" TO 3279' C&C MUD. POOH. STAND BACK WASH
PIPE. RIH W/ SPEAR. ENGAGE FISH. POOH W/ FISH. RIH W/
WASH PIPE. TAG 9-5/8" @ 3259'. WASH OVER 9-5/8" CSG.
DAILY:S36,263 CUM:$561,133 ETD:S561,133 EFC:$1,207,000
POOH 9-5/8"@ 5988' MW: 8.9 WBM
WASH OVER 9-5/8" TO 3346'. CIRC & COND. POOH. RIH W/
CUTTER & SPEAR. SET SPEAR & ATTEMPT TO JAR CSG FREE, NO
SUCCESS. CUT CSG @ 3334'. ENGAGE SPEAR. ATTEMPT TO PULL
CSG FREE, NO SUCCESS. POOH FOR NEW SPEAR & CUTTER.
DAILY:S27,151 CUM:$588,284 ETD:S588,284 EFC:$1,207,000
P/U MILL 9-5/8"@ 5988' MW: 8.9 WBM
L/D CUTTER & SPEAR. RIH W/ NEW SPEAR. ENGAGE 9-5/8" CSG,
PULLED CSG STUB FREE. POOH & L/D 77' OF CSG. RIH W/ WASH
PIPE. WASH OVER CSG F/ 3345' - 3350', HIGH TORQUE
ENCOUNTERED. POOH. L/D WASH PIPE. P/U METAL MUNCHER
MILL.
DAILY:S22,143 CUM:$610,427 ETD:S610,427 EFC:$1,207,000
CLEANING OUT FLOW LINE 9-5/8"@ 5988' MW: 8.9 WBM
P/U METAL MUNCHER BHA. RIH. SERVICE RIG, HELD BOP DRILL &
SAFETY MTG. CIRC & COND MUD. MILL ON 9-5/8" CSG F/ 3336' -
3380' CLEAN OUT METAL SHAVINGS IN FLOWLINE. MILL 9-5/8"
CSG F/ 3380' - 3410'. CLEAN OUT FLOWLINE.
DAILY:S26,752 CUM:$637,179 ETD:S637,179 EFC:$1,207,000
TESTING BOP 9-5/8"@ 5988' MW: 8.9 WBM
MILL 9-5/8" CSG TO 3440'. CIRC & COND. POOH. MILL HUNG UP
IN WELLHEAD, WORK MILL TO FLOOR. L/D MILL. WASH METAL
SHAVINGS OUT WELLHEAD & BOP. CHANGE LOWER RAMS TO VARIABLES.
TEST BOP.
DAILY:S24,725 CUM:$661,904 ETD:S661,904 EFC:$1,207,000
CIRC @ 1392' 9-5/8"@ 5988' MW: 8.9 WBM
TEST BOPS, HAD DIFFICULTY WITH TEST PLUG. RIH W/ METAL
MUNCHER MILL TO 3440'. ATTEMPT TO CIRC, DRILL PIPE PLUGGED.
POOH & CLEAN OUT METAL SHAVINGS IN BHA. RIH, DRILL PIPE
PARTIALLY PLUGGED. WORK PIPE AND CLEARED PIPE. CIRC TO
CLEAN HOLE. POOH TO WIPE CSG CLEAN. RIH TO 1392', DRILL
PIPE PARTIALLY PLUGGED. CIRC TO CLEAN HOLE.
DAILY:S24,047 CUM:$68~,951 ETD:S685,951 EFC:$1,207,000
The above is correct
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
I~~ c~"0 IT't'e Drilling Supt.
AR3B-459-2-B
INumber all dally well history forms consecutively
as they are prepared for each well.
lPage no.
ARCO Oil anei Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed.
Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final
completion. Report official or representative test on "Final" form. 1} Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion.
District ARCO A~J~SY~- INC. Icounty or Parish NORTH SLOPE
I
Field PRUDHOE BAY JLease or Unit PWDW 1-2
I
Date and depth Complet ...... d f .... r_~]~/(j~e d~i~g ..... k .... in prog ....
as of 8:00 a.m.
08/23/90 (17)
TD: 0
PS: 5893
SUPV: HMP/M/)D
Istale
AK
JWell no.
08/24/90 (
TD: 0
PS: 5893
SUPV:HMP
08/25/9O (
TD: 0
PB: 5893
SUPV:HMP
08/26/90 (
TD: 0
PB: 3447
SUPV:HMP
08/27/90 (
TD: 0
PB: 3447
SUPV:HMP
08/28/90 (
TD: 0
PS: 3067
SUPV:HMP
18)
The above is correct
For form preparation and distribution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
MILLING ON 9 5/8 CSG. 9-5/8"@ 5988' MW: 8.8 WBM
ATTEMPT TO UNPLUG DRILL PIPE, NO SUCCESS. POOH. RIH W/
12-1/4" BIT. CIRC & COND MUD. POOH. RIH W/ MILL. DRILL
PIPE PLUGGED AT 11 STDS IN. POOH & UNPLUG DRILL COLLARS.
RIH W/ MILL. CIRC & COND @ 9-5/8" STUB. MILL 9-5/8" CASING
F/ 3440' - 3455'
DAILY:S25,715 CUM:$711,666 ETD:S711,666 EFC:$1,918,766
19)
MILLING 9-5/8" CSG 9-5/8"@ 5988' MW: 8.8 WBM
MILL 9-5/8" CSG TO 3497'. PUMP 200 BBL LCM PILL TO REDUCE
FLUID LOSS. CIRC & CLEAN HOLE OF METAL SHAVINGS. MILL
9-5/8" TO 3577'.
DAILY:S28,588 CUM:$740,254 ETD:S740,254 EFC:$1,207,000
20)
RIH LOOKING FOR TOP CMT. PLUG 9-5/8"@ 5988' MW: 8.8 WBM
MILL 9-5/8" CSG TO 3592' CIRC & CLEAN HOLE. POOH, HOLE
SWABBING, RIH. CIRC HOLE CLEAN. POOH. L/D BHA. RIH W/ 5"
DRILL PIPE & 3-1/2" STINGER TO 4040' R/U CMT LINES. SPOT
79 BBL CMT PLUG, THIXOTROPIC CMT. POOH. RIH W/ 12-1/4" BIT
TO TAG CMT. ESTIMATED TOC @ 3257', ACTUAL TOC @ 3463'
DAILY:S154,498 CUM:$894,752 ETD:S894,752 EFC:$2,101,852
21)
CIRC. HOLE CLEAN TO TEST CSG. 9-5/8"@ 5988' MW: 8.7 WBM
DRILL CMT TO 3592' C&C. POOH. RIH W/ 3-1/2" STINGER, DP
PLUGGED. POOH, CLEARED DP. RIH. SPOT 200 SX (38 BBLS) CL
'G' CMT W/ CACL @ 16.5 PPG. POOH. HELD H2S DRILL. RIH W/
BIT, TAG CMT @ 3388'. WASH CMT TO 3427'. WOC. DRILL CMT
TO 3447'. C&C PRIOR TO TSTG 13-3/8" CSG.
DAILY:S60,286 CUM:$955,038 ETD:S955,038 EFC:$2,162,138
22)
MIXING CMT. 9-5/8"@ 5988' MW: 8.8 WBM
C&C MUD. ATTEMPT TO TEST 13-3/8" CSG TO 2500 PSI, CSG
LEAKED @ 500 PSI & 4 BPM. POOH. RIH W/ RTTS. ATTEMPT TO
SET RTTS @ 1147', WOULD NOT SET. POOH. CLEAN METAL SHAVINGS .~
F/ RTTS. RIH W/ RTTS. SET RTTS @ 3385', CSG DID NOT TEST. ~,~
SET RTTS @ 3130', CSG DID NOT TEST, SET TOOL @ 3100'. TEST~"~?
CSG F/ SURF TO 3100' TO 2500 PSI, OK. POOH. RIH W/ CMT "~
RETAINER AND SET @ 3067'. R/U DOWELL TO PERFORM 200 SX CMT
SQUEEZE, MIXING CMT.
DAILY:S23,539 CUM:$978,577 ETD:S978,577 EFC:$1,207,100
NU BOPE 9-5/8"@ 5988' MW: 8.8 WBM
MIX & PUMP 200 SX CL 'G' W/ 2% S-1 @ 15.8 PPG. SQUEEZED CMT
THRU RETAINER. FINAL SQUEEZE PRESSURE - 1100 PSI, 28 BBL CMT
INTO FORMATION. UNSTING F/ RETAINER, ATTEMPT TO REVERSE
OUT, DRILL PIPE PLUGGED. CIRC LONG WAY. POOH. P/U 2 STDS,
M/U RTTS. SET RTTS @ 34'. N/D BOP. INSPECT CSG HEAD,
~F~ ~N~GE~.. ~EM~VF CSG HEAD, WELD ON ADAPTER SWAGE, $~REW
ON NEW CSG HEAD. N/U SOPS & DRLG SPOOL.
DAILY: $3~/~51 \ CUM: $1, ~t~,828 ETD: $1, 010,82~ EFC: $1,207,000
~\ ~.\ ~ ~ / Ddllina Suet.
AR3B-459-2-B
INumber all daily well history [orms consecutively
as they are prepared for each well.
IPage no.
ARCO Oil and Gas Company
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed.
Number aH drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final
completion. Report official or representative test on "Final" form. 1} Submit "Interim" sheets when filled out but nol less frequently than every 30 days, or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin§ until completion.
District ARCO ALASKA INC. Icounty or Parish NORTH SLOPE IState
I
I
Field PRUDHOE BAY ILease or Unit PWDW 1-2
I
Complet ...... d f .... ~t,d~b~e ~,;~..~g ..... k .... in prog ....
Date and depth
as of 8:00 a.m.
08/29/90 (
TD: 0
PB: 3067
SUPV:HMP
AK
JWell no.
23)
DRILLING CMT. RET. 9-5/8"@ 5988' MW: 8.7 WBM
FIN N/U BOP. TEST CSG HEAD TO 2000 PSI, TEST BOPS. ENGAGE
RTTS @ 34'. RELEASE & L/D RTTS. SET WEAR BUSHING. M/U
12-1/4" BIT & BHA. RIH. SLIP & CUT DRILL LINE. FIN RIH.
DRILL ON CMT RETAINER F/ 3064' - 3067'.
DAILY:S58,038 CUM:$1,068,866 ETD:S1,068,866 EFC:$1,207,000
The above is correct
For form~'prep~ration and distribution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
]T,t,e Ddlling Supt.
AR3B-459-2-B
INumber all daily well history forms consecutively IPage no.
as they are prepared for each well.
I
ARCO Oi, =nd Gas Company
Daily Well History-Final Report
Instructions: Prepare and submit the,"F[~.:l~lT' on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold.
"Final Report" should be eubmil;~_~~.l~_r&flOns Ere luepended for an indefinite or appreciable length of time. On workovers when an official test is not
required upon completion, repo~Co~~'el~reeentatlve test data in blocks provided. The "Final Report" form may be used for reporting the entire
operation if space is available. ~-~!L ' ~~ ~ ' :
Accounting cost center code
ICounty or Parish
District ARCO A~-~,S~'~3~. TNC. NO]:~,TH SLOP]~
ILease or Unit
Field PRUDHOE BAY ADL: 28326
Auth. orW.O, nOAs3846 ITM WORKOVER - PLUG & ABANDON
API: 50-029-22024
State
AK
Operator
ARCO
Spudded or W.O. begun
ACCEPT
A.R.Co. W.I.
Date
21.7800
I otal number of wells (active or inactive) on this
ost center prior to plugging and
bandonment of this well
I
our 0330 HRS IPrlor status if a W.O.
I
8/7/90
Date and depth
as of 8:00 a.m.
Complete record for each day reoorted
NABORS 2ES
08/30/90 (!4)
TD: 0
PB: 3474
SUPV:GTG
RIG RELEASED 9-5/8"@ 5988' MW: 8.7 WBM
DRILL CMT F/ 3072' - 3122'. RIH & TAG CMT PLUG @ 3444'
CLEAN OUT TO 3454' & TEST CASING SQUEEZE TO 10.5 PPG EMW.
GOOD. DRILL CMT F/ 3454' - 3474'. PUMP SWEEP. POOH. LD
BHA. RELEASE RIG @ 1800 HRS, 8/29/90. BEGIN SIDETRACK
OPERATIONS (PWDW 1-2A).
DAILY:S12,923 CUM:$1,081,789 ETD:S1,081,789 EFC:$2,288,889
Old TD
Released rig
Date
Classifications (oil, gas, etc.)
IPB Depth
Kind of rig
Type completion (single, dual, etc.)
Producing method Official reservoir name(s)
Potential test data
Well no. Date Reservoir Producing Interval Oil or gasTest time Production
Oil on test Gas per day
Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date
corrected
The above is correct ~,
For form preparation and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
AR3B-459-3-C
Number all daily well history forms consecutively
as they are prepared for each well.
iPage no.
DIvlMon of AtlintlcRIchfleldCompa~y
I TELECO '~e~o oi.ie~ s~ , Inc,
oomme~ 6116 N~elson way
i Anchorage, AK
9951 $
(907) 562-2646
April 12, 1990
-33
JOB #75I'
ARCO ALASKA, INC.
WELL: PWDW 1-2
PRUDHOE BAY
RIG: NABORS 28-E
Attached please find a copy of the computer calculated MWD
directional surveys for the above mentioned well.
Teleco appreciates this opportunity to provide service to ARCO
Alaska Inc.
Teleco is committed to providing the highest quality MWD Service
and we would welcome any comments or questions concerning these
surveys or any of our other services.
Sincerely,
Jonathan G. Mapes
Field OperatiOns Supervisor
JGM/el
Enclosures
RECEIVED
ICItOFILMED
/
APR 2 G 1990
Oil & 6ii ~orm. ~omml~sloP
A _q~JdAT C(%~A PA I',JY
Company: ARCO ALASKA, Well: PWDW 1-2, Location: PRUDHOE BAY, Riq: NABORS 28E
Meas Course True Vertical Coordinates Closure Dog Leg
Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity
feet feet deg deg .feet feet feet feet feet deg deg/lO0'
1264 243 0.4 85.2 1264.00 -1.13 1.13S 1.78E 2.11 S 57.43E 0.06
1590 326 0.6 161.5 1589.99 -2.66 2.66S 3.45E 4.36 S 52.40E 0.20
1858 268 0.7 140.4 1857.97 -5.25 5.25S 4.94E 7.21 S 43.26E 0.10
2176 318 0.7 148.1 2175.95 -8.40 8.40S 7.21E 11.06 S 40.63E 0.03
2490 314 0.9 198.4 2489.92 -12.36 12.36S 7.44E 14.43 S 31.04E 0.22
2941 451 1.5 167.5 2940.83 -21.49 21.49S 7.60E 22.79 S 19.48E 0.19
3445 504 0.7 164.6 3444.73 -30.90 30.90S 9.85E 32.43 S 17.67E 0.16
3780 335 0.6 170.3 3779.71 -34.60 34.60S 10.68E 36.21 S 17.16E 0.04
4288 508 0.5 194.2 4287.68 -39.37 39.37S 10.59E 40.77 S 15.05E 0.05
4731 443 0.2 178.7 4730.68 -42.02 42.02S 10.13E 43.22 S 13.56E 0.07
5264 533 0.5 334.1 5263.67 -40.85 40.85S 9.14E 41.86 S 12.61E 0.13
5483 219 0.5 312.0 5482.66 -39.36 39.36S 8.01E 40.16 S 11.50E 0.09
5955 472 0.4 341.1 5954.65 -36.42 36.42S 5.95E 36.90 S 9.27E 0.05
PAGE 2
'I-E"~'~CO OJ. 1 ~ J.e -Icl
PLAN VIE~
Ser"v ic
lO0
2490
~1445
ARCO ALASKA
PWDW 1-2
PRUDHOE BAY
NABORS 2BE
JOB# 751TAK/O0
SCALE:
1 inch = 50 feet
50
50
100
150
20O
a50
300
350
CO
5O
50
EAST (ft)
lO0
150
2OO
ORIGINAL
SUB.$URFACE
DIRECTIONAL
$URVEY
[~[] UIDANCE
[~ONTINUOUS
~____..]OOL
Company ,
Well Name
Field/Location,
ARCO ALASKA, INC.
I
PWDW1-2(761' FSL,252' FWL,SEC 31,TllN,R15E,UM)
PRUDHOE BAY, NORTH SLOPE, ALASKA
Il il I I II
Job Reference No.
73895
Loaaed By:
MCBRIDE
Date
.... ~J h 7-APR-90
~a/la__/,0/a.7~/,~o ~ KOHRING
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
ARCO ALASKAt INC.
PWDW 1-7.
PRUDHOE BaY
NORTH SLOPE, ALASKA
SURVEY DATE: 07-APR-1990
ENGINEER: MCBRIDE
METHODS OF CO#PUTATION
TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH
INTERPOLATION: LINEAR
VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZI#UTH OF NORTH 0 DEG 0 MIN EAST
COMPUTATION DATE: 9-JUN'90 PAGE I
ARCO ALASKA, [NC.
PHDN 1-2
PRUDHOE BAY
NORTH SLOPE, ALASKA
DATE OF SURVEY: O/-APR-199Q
KELLY BUSHING ELEVATION:: 62~00 FT
ENGINEER:' MCBRIDE
INTERPOLATED VALUES FOR EVEN 100 FEET OF HEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
OEPTH OEPTH DEPTH OEG MIN DEG MIN
0.00 0.00 -62°00
100.00 100.00 38.00
200.00 ZO0.O0 138.00
300.00 300.00 238.00
400.00 400.00 338°00
500.00 500.00 438.00
600.00 600.00 538.00
700.00 700.00 638.00
800000 800°00 738.00
900.00 900.00 838000
VERTICAL DOGLEG RECTANGULAR! COORDINATES HORIZ.:DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/NEST DIST. AZ[MU:TH
FEET OEG/IO0 FEET
0 0 N 0 0 E '0.00 0.00
0 :7 S 40 55 bi i -0.10 0.82
0 5 N 9 12 E -0.18 0.83
0 9 : S 68 52 bi -0.25 0.65
0 7 S 20 47 id -0.41 0.59
0 4 S 25 22 bi -0.53 0.46
0 5 N 13 25 E -0.60 0.53
0 4 N 51 1'1 E -0.63 0.37
0 5 S 61 37 E -0.65 0045
0 8 S 35 23 Id -0.62 0°50
FEET FEET DEG WIN
O. O0 M O. O0 E
0.10 S 0ol0 W
0.18 S 0.23 W
0.25 S 0.37 N
0.41 S 0.52 id
0.53 S 0.64 N
0.60 S 0.72 Id
0.63 S 0.79 W
0.65 S 0.86 M
0.62 S 0.91
0.00 N 0 0 E
0.14 '~S 46 17 id
0.29 S 52 54 Id
0.44 S 56 16 Id
0.66 .S 52 15 M ·
0.83 S 50 33 bi
0.94 S 50 21
1.01
1.08 S 53 0
1.10 S 55 31' M
1000.00 1000.00 938°00 0
1100.00 1100000 1038.00 0 14
1200.00 1200.00 1138.00 0 17
1300o00 1300.00 1238.00 0 22
1~00'00 1399.99 1337.99 : 0 27
1500.00 1499o99' 1437.99 0 25
1600.00 1599.99 1537,,99 0 26
1700000 t699.99 1637.99 0 29
1800'00 1799.98 1737.98 0 4,0
1900.00 1899.97 1837.91' 0 39
S 10 41 E -0.73 0.39 0.73 S
S 77 0 E -0.99 0.33 0.99 S
S 83 I E -1.18 0.48 1.18 S
S 74, 45 E -1.34 O.4& 1.34 S
S 64 8 E -1.55 0.29 1.55 S
S 54 59 E -1,83 0.54 1.83 S
S 48 52 E -2.22 0.63 ZoZZ S
S 50 9 E -2.84 0.22 2.84 S
S 4,2 12 E -3.58 0.49 3.58 S
S 31 32 E -4.37 0.68 4o31' S
0.84 W : 1.11 S 49 1 W
0.65 W
0.25 bi
0.24 E
O. 80 E
1.41 E
2.06 E
2.75 E
3.37 E
4.02 E
1.18 S 33 9 w
1.21 S 11 47 ltl
1.36 S 10 3 E
1.T5 S 27 10 E
2.31 S 37 40 E
3.03 S 42 .59 E
3.95' S 44 6 E
4.92 S 43 20 E
5.94 S 42 37 E
2000.00 1999.97 1937.97
2100.00 2099.96 2037.96
2ZO0.O0 2199.96 2137.96
2300.00 2299.95 2237.95
2400000 2399.95 2337.95
2500000 2499.94 2437.94
2600.00 2599.94 253T.94
2700.00 2699.93 2637093
2800.00 2799.92 2737.92
2900.00 2899.91 2837.91
0 31
0 30
0 38
0 39
0 37
0 44
0 35
0 39
0 58
0 56
S 29 30 E -5.24 0.50 5.24 S
S 34 46 E -6.04 0.21 6.04 S
S 31 38 E -6.95 0.41 6095 S
S 27 46 E -7.98 0.30 T.98 S
S 22 0 E -8.93 0.34 8.93 S
S 14 13 E -9.94 0072 9.94 S
S 16 52 E -11.00 0.35 11.00 S
S 18 48 E -12.17 0000 12.17 S
S 17 14 E -13.50 0.15 13050 S
S 13 50 E -15.03 0.29 15.03 S
4.66 E
5.17 E
5.74 E
6.24 E
6.60 E
6.96 E
7.37 E
7.71 E
8.06 E
8.49 E
7o01 :S 41 38 E
7.95 $ 40 35 E
9o0~ $ 39 31 E
10.13 S 38 I E
11.10 S 36 30 E
12.14 S 35 0 E
13.24 S 33 49 E
14.40 S 32 Zl E
15.72 S 30 50 E
17.26 S 29 28 E
3000.00 2999.89 2937.89
3100.00 3099.88 3037.88
3200.00 3199.87 3137.87
3300.00 3299.86 3237.86
3400.00 3399.86 3337.86
3500.00 3499.86 3437.86
3600.00 3599.85 3537.85
3700.00 3699.84 3637.84
3800.00 3799.83 '3737083
3900000 3899.82 3837.82
0 55
0 59
0 42
0 25
0 34.
0 42
0 48
0 38
0 41
S 11 43 E -16.64 0.31
S 7 10 E -18.27 0.56
S 0 56 M -19.74 0.51
S 8 52 E -20.70 0.38
S 14 5 E -21046 0.45
S 20 I E -22039 O.4T
S 18 4.5 E -23.81 0.65
S 9 39 E -25.01 0056
S 18 17 E -26.24. 0.11'
S 4. 3 E -27.26 0.53
16.64
18.27
19.74
20.70
21.46
22.39
23.81
25.01
26.24
IT. 26
8.91 E
9.13 E
9.23 E
9.20 E
9.27 E
9.69 E
10.05 E
10.38 E
10.72 E
10.93 E
18.88 S 28 10 E
20.42 S 26 33 E
21.79 S 25 3 E
22.66 S 23 57 E
23.37 S 23 22 E
24039 S 23 24, E
25.85 S 22 53 E
27.08 S 22 33 E
28.34 S 22 14 E
29.37 S 21 51 E
COMPUTATION DATE.' 9-JUN~90 PAGE"
ARCO ALASKA, INC.
PWDW 1-2
PRUDHOE BAY
NORTH SLOPE, ALASKA
TRUE SUB-SEA COURSE
HEASURED VERTICAL VERTICAL DEVIATION AZIHUTH
DEPTH DEPTH DEPTH DEG HIN DEG NIN
DATE OF SURVEY: 07-APR-1990
KELLY BUSHING~ELEVATION:~ 62.00 FT
ENGINEER: RCBRXDE
·
ZNTERPOLATED .VALUES~'FOR EVEN 100 FEET OF ,MEASURED DEPTH
VERTICAL DOGLEG RECTANGULAR COORDINATES HORXZ. DEPARTUR~
SECTION SEVERITY'NORTH/SOUTH EAST/WEST DIST; AZZMUTH
FEET DEG/100 FEET
4000.00 3999.82 3937.82 0 32
4100.00 ,099.81 ,037.81 0
32
,ZO0.O0 4199.81 '137.81 0 25
,300.00 ,299.81 ,237.81 ~ 0 20
,400.00 4399.81 ,337.81 ~ 0 32
4500.00 4499.80 4437080 0 20
4600.00 4599.80 4537.80 0 6
4700.00 ,699°80 4637.80 0 19
,800.00 4799°80 4737.80 0 18
· 900.00 ,899.80 4837.80 0 5
0 19
0 12
0 ZO
0 28
0 36
0 18
0 21
0 19
0 11
0 25
FEET FEET DEG MZN
5000.00 4999.80 4937.80
5100.00 5099.80 5037.80
5200.00 5199.80 5137.80
5300.00 5299.79 5237.79
5400.00 5399°79 5337.79
5500.00 5499°79 5437.79
5600.00 5599°78 5537.78
5700.00 5699.78 5637.78
5800000 5799.78 5737.78
5900.00 5899°77 5837°77
0 25
0 25
S 12 29 E -28.39 O.ZO 28.39 S 11.14. E
S 3 14 ~1 -29.25 0.66 29.25 S 11.24 E
S 12 ,4 E -30.18 0.39 30.18 S 11.34 E
S 3 29 i~ -30.77 0°09 30-77 S 11.39 E
S 5 32 ~1 -31.47 0.04 31.,7 S 11.26 E
S 8 40 E -32.2, 0.04 32.24 S 11.27 E
S 7 2 E -32-65 0.00 32°65 S 11.3, E
S 5 2 ~J -32.96 0.66 32.96 S 11.32 E
S 8 10 E -33.56 0..41 33.56 S 11.33 E
S 0 42 E -33.82 0.21 33.82 S 11.44 E
6000.00 5999.77 5937.77
6005.00 6004°77 5942.77
21 58 W -34.08 0°45 34.08 S 11.28 E
68 37 W -34.4.2 0.54 34.42 S 11'06 E
89 8 W -3,.54 0°49 34.54 S 10.60 E
43 32 W -34.21 0.23 34'21 S 10.04 E
44 4 ~ -33°43 0.50 ' 33.43 $ 9.39 E
44 ,4 # -32.88 0.54 32.88 S 8.81E
35 12 ~ -32.55 0.25 32.55 S 8o61E
50 50 M -32.1, 0.37 32.14 S 8.22 E
36. 8 H -31.86 0:.45 31.86 $ 7.9! E
26 35 M -31.33 0.00 31.33 S 7.61 E
Id 26 35 M -30.67 0.00 30.67 S 7.28 E
N 26 35 M -30.64 0.00 30.64 S 7.27 E
30.49 S 21 26 E
31.34 S 21 I E
32.24 S 20 36 E
32.82 S 20 19 E
33-43 S 19' 41 E
34'15 S 19 16 E )
34.56 S 19: 9 E
34.83 S 18 58 E
35.,3 S 18 39 E
35070 S 18 41 E
35.90 S 18 19 E
36.15 S 17 48 E
36.13 S 17:3 E
35-65 S 16 22 E
34.72 S 15 41 E
34.04 S 15 0 E
33.66 S 1, 49 E
33.18 S 14 21 E
32082 S 13 57 E
32.24 S 13 40 E
31o52 S 13 22 E
31.49 S 13 21'E
COHPUTATION DATE: 9-JUN-90
P&GE ]*
ARCO ALASKAt ']:NC.
PMDId 1-2:
PRUDHOE BAY
NORTH SLOPEr ALASKA..
TRUE SUB-SEA COURSE
HEASURED VERTICAL VERTICAL DEVIATION AZINUTH
DEPTH DEPTH DEPTH D.EG"RIN DEG
DATE OF SURVET: 07-APR-1990
KELLY BUSHING ELEVATION:' 6Z°O:O:FT:'~*
ENGINEER: #CBRIDE .
INTERPOLATED VALUES;;FOR EVEN'*IO'O0 FEET OF MEASURED DEPTH
YERTZCAL DOGLEG RECTANGULAR CDORDINATES~HORIZ. DEP~TURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZXHUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 0 N 0 0 E 0.00 0.00 0.00
0 4 S 10 41 E -0°73 0.39 0.73
0 31 S 29 30 E -5.24 0.50 5°24
0 55 S 11 43 E -16.64 ~ 0.31 16.64
0 32 S 12 29 E -28.39 0.20 28.39
0 19 S 21 58 W -34.08 0.45 34.08
0 25 N 26 35 W -30.67 0.00 30.67
0 25 N 26 35 W -30.64 0.00 30.64
0.00 0.00 -62.00
1000.00 1000.00 938°00
2000.00 1999.97 1937.97
3000.00 2999.89 2937.S9
4000.00 3999.82 3937.82
5000.00 4999.80 4937.80
6000.00 5999.77 5937o7T
6005.00 6004.77 594Z.77
0.00 E 0.00 N 0 0 E
0.84 W 1.11 S'49 1
4.66 E 7.01 S 41 38 E
8.9! E 18.88 S 28 10, E
11.14 E 30.49 S 21 26 E
11.28 E 35.90 S 18 19:E
7.28 E 31.52 S 13
7.27 E 31.49 S 13 21E
COMPUTATION DATE: 9-JUN'90
PAGE
ARCO ALASKAt INC.
PHObi 1-Z
PRUDHOE BAY
NORTH SLOPEr ALASKA
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG
DATE OF SURVET: "'O7-APR-1990 '!
-62. O0 0 0
0.00 :' 0 10
N 0 0 E 0.00 0000 0.00 N 0.00 E
S 48 3' M -0.03 0.28 0.03 S 0.06 W
0 lO S 25 55 Id -0.15 0.83 0.15 S 0.24 g
0 5 S 45 14 Id -0.22 0.53 0.22 S 0.31 bi
0 8 S 50 12 bi -0.34 0.60 0.34 S 0.47 bi
0 10 S 40 18 Id -0.47 0-63 0.47 S 0.62 If
0 7 S 3 39 Id -0.58 0.66 0.58 S 0.73 Id
0 7 S 5 41 Id -0.61 0.64 0.61 S 0.81 W
.0 7 S 55 6 M -0.61 0.,2 0.61 S 0.85 g
0 6 N 59 52 'id -0.60 0.,8 0.60 S 0084 ~
962o00 962.00 900000
1062.00 1062.00 1000.00
1162.00 1162.00 ~ 1100.00
1262.00 1262.00 '1200.00
1362000 1362000 1300.00
1462.01' 1462.00 1,00o00
1562.01 1562.00 '1500.00
1662.01 1662.00 1600.00
1762002 1762.00 1700.00
1862.02 1862.00 1800.00
0 5 S 83 49 E -0.71. 0.33 0.71 S 0.86 bi
0 16 S 40 50 E -0.91 0.59 0.91 S 0.79 ~d
0 19 S 54 21 E -1.11 0.56 loll S 0.,4 Id
0 19 S 63 51 E -1.25 0.58 1.25 S 0°02 E
0 19 S 64 0 E *','1.44 0.26 1.44 S 0o57 E
0 21 S 67 ,Z E -1.71 0.29 1.71 S 1.20 E
0 25 S 63 33 E -Z.07 0.28 2.07 S 1.8' E
0 3, S 50 33 E -2.62 0.37 2.62 S 2.48 E
0 36 S 35 24 E -3.24 0.72 3.24 S 3.11 E
0 33 S 39 11 E -4.05 0.03 4.05 S 3.80 E
1962003 1962.00 1900000
2062.03 2062.00 2000.00
2162.04 2162.00 2100000
2262.04 2262.00 2200.00
2362.05 2362.00 2300.00
2462.06 2462.00 2400.00
2562.06 2562.00 2500.00
2662007 2662.00 2600.00
2762.08 2762.00 2700.00
2862009 2862°00 2800.00
0 35 S 39 51 E -4095 0.35 4.95 S ,.45 E
0 33 S 37 28 E -5.77 0.,7 5.7_7 $ 4.97 E
0 41 ~ 32 37 E -6.59 0.29 6.59 S 5.50 E
0 43 S 24 21 E -7'57 0°68 7.5? S 6.03 E
0 32 S 16 25 E -8.56 0.55 8056 S 6.'8 E
0 36 S 18 36 E -9.53 0.16 9.53 S 6.85 E
0 36 S 23 48 E -10.64 0.19 10.64 S 7023 E
0 46 S 18 14 E -11.73 0.47 11073 S 7.55 E
0 51 S 11 13 E -12.91 1.07 12-91 S 7.90 E
0 53 S 15 30 E -14.45 0.00 1,.45 S 8.34 E
2962.10 2962.00 2900.00
3062.12 3062.00 3000.00
3162.13 3162.00 3100.00
3262013 3262.00 3200.00
3362.14 3362.00 3300.00
3462014 3462.00 3,00.00
3562015 3562.00 3500.00
3662.16 3662.00 3600.00
3762.17 3762.00 3700.00
3862.17 3862.00 3800.00
0 57 S 15 51 E -16005 0.12
0 56 S 5 50 E -17.63 '0.37
0 49 S I 58 E -19.23 0.26
0 34 S 3 27 Id -20.37 0.78
0 27 S 0 12 id -21.12 0067
0 34 S 28 12 E -22.01 0.33
0 55 S 12 10 E -23.26 0.13
0 ,1 S 15 10 E -24056 0.09
0 44 S 18 42 E -25.82 0.33
0 33 S 8 26 E -26.86 0.43
0.00 0.00
62.00 62.00
162000 162.00 100000
262.00 262.00 200000
362.00 362.00 300000
462.00 462.00 400.00
562.00 562.00 500.00
662.00 662.00 600.00
762.00 762.00 700.00
862.00 862.00 800.00
FEET DEG/IO0 FEET FEET
16.05 S 8.76 E
17.63 S .9.06 E
19023 S 9.22 E
20.31' S 9.18 E
21.12 S 9.23 E
22.'01 S 9.52 E
23.26 S 9.90 E
24.56 S 10.28 E
25.82 S 10.58 E
26.86 S 10.89 E
FEET DEGMIN
0.00 N 0 .'~0 E
0.06 S 61 29 If
0.28 $ 58 12 bi
O.3B S
0.57 S 54 3 bi
·
0.78 S 52 50 Id
0.93 S 51 21
1.01 S 53 8 M
1.05 S 54 21 Id
1.04 S 54 34 bi
1.1Z S 50 34 Id
1,20 S 40. 58 If
1.20 S 21 24 U
1.25 S 0 52 E
1.55 S 21 43 E
2.09 S 35 8 E
2077.. S 41 37 E
3.6~. S 43 ZS~E
4,049 S 43 50 E
5.56 S 43 12 E
6.65 S 41 57 E
7.62 $ 40 43 E
8.58 S 39 51 E
9.68 S 38 31 E
10.73 S 37 7 E
11.73 S 35 42 E
12.86 S 34 12 E
13.95 S 32 48 E
15013 $ 31 27 E
16.68 S 29 59 E
18.28 S 28 38 E
19.82 S 27 12 E
21.33 S 25 37 E
22.35 S 24 15 E
23.05 S 23 37 E
23.98 S 23 23 E
25.28 S 23 3 E
26.62 S 22 43 E
27.90 S ZZ 17 E
28.98 S ZZ 5 E
KELLY BUSHING :ELEVATION: ::: 6ZOO0 FT
ENGINEER: MCBRIDE
·
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
VERTICAL OOGLEG RECTANGULAR COOROZNATES HORIZ. OEPARTURE,
SECTION SEVERITY NORTH/SOUTH EAST/MEST DIST. AZIMUTH
COHPUTATION DATE: 9-JUN-90 PAGE
ARCO ALASKA~ INC.
PHDid 1-2
PRUDHOE BAY
NORTH SLOPE~ ALASKA
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG
DATE OF SURVEY: OT,-APR-1990
KELLY BRUSHING ELEVATION: 62.00: FT
ENGINEER: RCBRZDE
INTERPOLATEO VALUES FOR EVEN 100 FEET OF SUB-SEA OEPTH
VERTICAL DOGLEG RECTANGULAR COORDINATES HORZZ. OEPARTURE
SECTION SEVERITY NORTHtSOUTH EAST/WEST OZST' i AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG #IN
3962.18 3962.00 3900000 ' 0 38
S 14 23 E -28.02 0.58
0 28 S 5 33 E -28.93 0.21
0 32 S 9 13 E -29.87 0.27
0 20 S I 41 E -30.55 0.09
0 26 S 13 31 id -31.15 0.51
0 26 S 3 7 E -32.00 0°42
0 12 S 9 27 E -32.56 0.52
0 10 S 3 29 g -32.79 0.00
0 22 S 1 15 E -33.34 0°03
0 8 S 31 23 E -33°75 0.00
4062.18 4062.00 4000.00
4162.19 4162.00 4100.00
4262.19 4262,00 4200.00
4362o19 4362°00 4300.00
4462°20 4462°00
,562.20 4562.00 4500.00
a662.20 4662.00 4600.00
4762.20 4762°00
4862.20 4862.00 4800.00
39'46 g -33.91 0.71
35 14 id -34.33 0.26
TO 30 W -34.51 0.21
53 22 id -34040 0.18
40 7 W -33.75 0.34
47 57 ~ -33.04 0.11
19 20 W -32.71 0.59
46 26 g -32.28 0.01
44 51 W -31.97 0.16
26 35 g -31.57 0.00
4962.20 4962.00 4900.00 0 14
5062.20 5062.00 5000.00 0 14
5162.20 5162.00 5100'00 0 16
5262.21 5262.00 5200.00 0 22
5362.21 5362.00 5300.00' 0 40
5462.21 5462.00 5400.00 0 27
5562.21 5562.00 5500000 0 11
5662.22 5662.00 5600.00 0 19
5?62.22 5762.00 5700.00 0 16
5862.23 5862.00 5800.00 0 25
0 25
0 25
N 26 35 id -30.92 0.00
N 26 35 M -30.64 0.00
5962.23 5962.00 5900.00
6005.00 6004.77 5942.77
28.02
28.93
29.87
30.55
31.15
32.00
32.56
32.79
33.34
33.75
33.91 S
34.33 S
34.51 S
34.40 S
33.7'5 S
33.04 S
32.71 S
32.28 S
31.97 S
31.57 S
30.92
30.64
11.05 E 30.12 S 21 31 E
11.23 E 31-04 S 21 13 E
11.28 E 31.93 $ 20 41 E
11.39 E 32.61 S 20 27 E
11.31 E 33.14 .S 19 57 E
11.25 E 33.91 S 19 22 E )
11.32 E 34.47 S 19 10 E
11.33 E 34.69 S 19 4 E
11.32 E '35o21 S 18 45 E
11.41 E 35.63 S 18 41 E
11.37 E
11.16 E
10.78 E
10-2.5 E
9.68 E
8.99 E
8.69 E
8.38 E
8.01 E
7.74 E
35°76 S 18 33 E
36.10 S 18 0 E
36.15 S 17 21 E
35.89 S 16 36 E
35.11 S 16 0 E
34.25 S 15 13 E
33.84 S 14 52 E
33.35 :S 14 33 E
32,96 S 14 4 E
32-51 S 13 46 E
7.41E
7.27 E
31.79 S 13 28 E
31.49 S 13 21 E
COMPUTATION DATE: 9-JUN-90 PAG. E~ '6-
ARCO ALASEA, INC.
PHDW 1-2'
PRUDHOE BAY
NORTH SLOPE,*ALASKA
MARKER
UGNU SAND
TOP UGNU C
GCT LAST READING
PBTD
BOTTOM UGNU C
TOP UGNU 8
BOTTOM UGNU B
WEST SAK
TO
DATE OF SURVEY: O7-APR-1990
KELL! BUSHING ELEVATION: 62oO0'FT
ENGINEER: MCBRIDE
INTERPOLATEO VALUES FOR CHOSEN HORIZONS
SURFACE LOCATION = 761* FSL & 252· FWL~, SEC31 T11N R15E
MEASURED DEPTH
BELOB KB
TVD
FRON KB SUB-SEA
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/BEST
5525.00
5525.00
585'1.50
59O0°O0
5907.00
5907.00
5994.00
5994.00
6005.00
5524.79 5462.79
5524.79 5462.79
5851.Z8 5789.28
5899.77 5837-77
5906.77 5844..77
5906.77 5844.77
5993.77 5931.77
5993.77 5931.77
6004.77 5942.77
32.80 S 8o74 E
32.80 S 8.'74 E
31.64 S 7.77 E
31.33 S 7.61 E
31.Z8 S 7.59 E
31.28 S 7.59 E
30° 71 S 7'30 E
30.7! S 7.30 E
30.64 S 7.27 E
COMPUTATION DATE.' 9-JUlkgO PAGE
ARCO ALASKA, INC.
PWDW 1-2
PRUDHOE BAY
NORTH SLOPE~ ALASKA
MARKER
UGNU SAND
TOP UGNU C
PBTD
BOTTOM UGNU C
TOP UGNU B
BOTTOM UGNU B
WEST SAK
TO
DATE OF SURVEY: OT-APR-1999
KE[LT BUSHING ELEVATION:' 62.0'O:~"FT
ENGINEER: MCBRIDE
SURFACE LOCATION = 761e FSL & 252~ FWL~ SEC31 711# R15E
MEASURED DEPTH TVO
BELOW KB FROM KB SUB-SEA
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
5525.00 5524.79 5462.79 32.80 S
5525.00 5524.79 5462.79 3Z.80 S
5900~00 5899.77 5837.77 31.33 S
5907.00 5906.77 58¢4.77 31.28 S
5907.00 5906.77 58¢~.77 31.28 S
5994.00 5993.77 5931.77 30.71 S
5994.00 5993.77 5931.77 30.71 S
6005°00 600~.77 59~2o77 30o6~ $
8.74 E
8.74 E
7.61 E
7, 59 E
7.59 E
7.30 E
7.30 E
7.27 E
F]:NAL WELL LOCATION AT TO:
TRUE SUB-SEA
MEASURED VERTICAL VERTICAL'
DEPTH DEPTH DEPTH
6005.00 6004.77 5942.77
HORIZONTAL DEPARTURE
DISTANCE AZIMUTH
FEET DEG WIN
31oa9 s 13 ~21 E
SCHLUMBERGER
O I RECT I ONAL SURVEY
COMPANY ARCO ALASKA, INC.
WELL PWDW 1-2
FI ELD PRUDHOE BAY
COUNTRY USA
RUN ONE
DATE LOOOEO 07 - APR - 90
REFERENCE 7389S
WELL', PWD~W 1-2
(761' FSL, 252'
FWL,
~EC 31,
TllN,
R15E, UM)
HORIZONTAL
PROJECTION
$CRLE = ! / ! 0 ! N/FT
113
-2O
-3O
-4O
SOUTH -50
-90
~E5T
-2O
- ! 0 0 I 0 20 E)O 40
~o
E ~,<-5 T
WELL'
(761'"
PWDW 1-2 '-~' VERTICAL PROJECTION
FSL', 252' FWL, JEC 31, TllN, R15E, UM)
BOUTH
-~0 -40 -30 -20 -10 0 0 10 20
- ~ L d ' ~--i-' W'~" -~"'-*~+'-"'+'~-*-~ ..... H-+" ..... ~'* ..... ~'+i- -+""~'4 .... f'i ..... ~ ..... ~'~'~ ...... r'-f'¢' '"-
~. L~-~-.~.~...I-...--~.-~..~.q..4...~.~-~ ~ ~. ~ -.~.-.~...~-.-~-.-~-.~.-.---;-~.~..~...i..i.-+4.-~ -*.-*-~--..4-.-~.+~--. "'~"i"i"~ ..... ~-~q"'t ..... ~...~...i...~..~
.... ~..?--.~-~.~- + + ~ + - ~+ ~- ~ ~ ...... ~-~..~--~.~ ..... ~ .......
.~ ,.~4~ ..... ~-~-~ ...... ,.++..+ ...... ,++-+~-++-?---~-+-~--~-,-~.+- .~-~-m-.~]-,-mq ..... ~'-+ .... 'r~'+"~"~ ....... f'~'"f'~ ...... ~++'~' ¥.,..4-+.
4%+--4-4-++--.?+-++1---f--f-?~ ...... f't"~"5'l"f?? 5'-?'?-'?¢?+' '11'"~,;~-"-?nnn~?'1"t-~ .... i"'~'","~ ....... r' ,--.r--; ...... ~mt"r'--'f"f"f'i"'
5i ~ ii~ ~..~ L4...LN...L...L~.~.&.t4...LN-..../-;..~../ ....... LLFi ...... ~-4..~.., ...... L444 ....... L4.44.-.~..4-N..F.+L.!..4'....~-4...~.-.* ...... LN...~ ....... ~..4...F,...
...f.+.+..~ ...... ~_.L.~...~...
]h']~]~. 4. L ~ .i ...... i.X..~.4.. ~ i- z4.,...;..~...i..4...4..~.4...i-..4.4-..;4 .... : %.4.....~..-~-+..+..~...;..~.~-~ ........ e-4-.+-~-.-4---H.-4.-
-+-+'"t"'+ ...... f"t'4"+"
'T T ~ '~ ~ ~,t,,, ~~-' _~, ~,~, ~ '"'f"f"H ...... t"T'"t"ff ...... T"~"t"t ......~ ~t'"t"'z'"t'-
~, ~/ ~ i ~ ~ ~ ~ ~ ~.~ ~ ~ ~.~ ....... L.&.J._L..'.. L..L..1~....L..~...i_~_...4-~..~..4 ...... ~"';"~';"'-~"+-+"~"-i-+-f'+"q"+'+'"f'+"FT~-i"~ ....... ~'~'"~'-~"
.~.-.~-+..'...~...,..¢.~ ...... *..-.;.-+-+-?+--+.+---~ ....... f-+-+-~-f.- --~'-+-+-~ ....... r--t'-~--'t ...... ?"T"?"'%'"'T"r"?"?""%-?-T"Y"~'"%T' ?:-'"'~"r'T"T-- ~ I ~ . "'T'+"?'"?"'
~-, ~-..;..~..~.¢.. ~ ~ ~ ~ ' ' :~ ~ ~ ~..--H4-¢--Ff-~----~4-.H ....... H--Ff-..-~-~-~...: ...... ~...:-:...:.-..¢4..-;-~... 4..F¢..~ ...... H.4--~ ....... f--~.-~ .....
................. ~...~++..
-r-~'---c'r' "~-r"r-'T ....... YT"~"~""T'T'?"~ ...... ~..4.-4.4 ...... +---*-..t..-~ ................ t ...... +T'f'i-'
~Tq ..... $.-~4--~--- . ................
:::'
~',~'. T" ~'f'f-'f"f'f'f'f"f"f"'"i"i'"f"?f"f'f'f" .-~-i-im H++"~-z'r?'t ...... tJ?l" ,,
' ' ' i ~ iii '' _
...~...~...+..~ . ~.~.~..~ ....
, ' '--- -¢
1 I t J~ ! i ' ~ .... I ............. I . · : ..., · :.~ ......~,.... . .......................
-~'~-', r'5~:~_~ ~.~.._..,.z.~.x.+~...+...~..,..,.,.,.,.~_ .~Z,.....~.4...~.4~--..=.,.T:, ...... ~q+ ..... ~-~- ~ ......... ~.~ -.+ ........ ~---4--.,.--
~..~- ~4 ~ 4-..4...~,4...,-.~..~ ............................................. , ................. ,-.=-~--+ ...... , ..... .- ~" h ~ -H-
, ~ , -: , ¢'F"-T'~-'T t ~ = ~ ~ t ': :: . i , ~ ~ , ~ ~ ~ : ~ i ~ ~~]' ' . ~t '~'~ ~.: . .... '._{ '- ............ ~ .......... ~ ~..4 ....... ~...L.4..4...
' ' ' -~ ~ ' ' .... i · ' 1
.... :'t ~ i ~ i ~ ;: ~ i i ~ t ~ ~ ~ ~ ~ ~ ~ ! I~ I ~ ~ , ~ l
..~A-~-~..~,.,- .~-.-~.~-+-., ............................... 1 ......................................... ,..,.¢.., ....... +--~ -l-~.--~ 4-~4-~-4--.~-?-{ ....... ,-T+--I ..... [-'~ q-4'-'-+-'h -t-¢ ..... . ............ '-f".
~ i ? ~ i ~ : ~ ~/ : : : : : : : : : ; : : · : ~ : ' · '..' ...... '-.~.-.' .... ~..-~.-'--4--~--.'.--+.-*..-~ ..... ~- '-~--~ --' ................................. ~"~ .....
'~7 ~'~"~'~... ...... rL~5::]::~:-~:. . ~ ~.: ~,~ ~ ~ ~i ?, ?,,'~ ]: ~ ~z:Z: ]]:]~..._ -~g4-~.~-*-4-*-~ -.~.~+ ;-~ 4-, T-4... ~+ .....
~. ~ j~, ~ ~, ~ ~ ~,~;~ ,~,, 4~ ,~: .~.d.4...: ..... ~-4-~.--~ ....... ~..L,..~....~.4-.~.-~-~J.A....d..¢..F-L-.~.-+--~---: ....
~%.~::: ::~:]~:::~:~ ::::::::::::::::::::::::: :::;::;q::::::::::::::::::::::::: ::~::;:;::::'.::+:z:4~::: :~::G:: ::.F~4--~ .... f-?'i ..... +-'H-f' b'~ q ..... t- 2" ~- 5:!"i-?"']-~-H'"~
~'~-~'+ '71", i ! ~l% -?"~i~, ,"' -"t"~"'~' ''' ~ ;..Z_. ~ ...L.4...;...;...L.4i ......... ...... ~.--~--4-.-~ ...... ~.-~.-4*-'f ...... 4-*.-4 ..... ~-~--4--4-., ~-.~-.i .4 ......... ~ ~-.4,, ....... 'T~ ,~m"~ .............. T-T. .......................
] l&, ., ~, , ...... ; .... 1' ~, . ~,4 .... ~..;.,..! ..... ,..~...~-~ ..... ,.-.~...~..., ....... ,..~...,.--~ ............ *"~'-*--'~---*-'-r-~ ............. r"t ......... L'"'f ...... i ..... .'"'-'
, - ~ ~ ~ , J I : i i i i i i : i : : : ~ ~ ~ , : ! : : : i ~ : : i : .,...'...:..,, ........ '...~...'..,~ ....... ~...'...¢...~ ....... '...'. ~ ........ ~-.+ ........ 4 ...... * ........ +-..*---?--.
-~-i'~--T-i-!-"rq-r'i"~"~ ....... r'?~"'r"~'"r"r"r-r-'f'T"r"YT'' 'T'r'TT-'-T'TT'T"~-'FT'TT'r'~ ~ ? ~ ~ ~ T ~ ~ T ~ ~ ~"~] ~ ~] ~..~ ...... I_.I...L.~ ...... Z.4.4..~...
~--+---~-,~--~1-¢.++-~ ...... ~.-4--+--i ...... i'-'i"-'?'T"Y'i"~-T" "'ri'-t"~ ...... ~"T'~"r'~"T"~"'r"~"FT-FT'T'" '¥1'UU~'3F"r'T"~ ...... t'TT"F""! ......
I t : i I ~ i ~ ~ i ~ i ~ i i ~ i ~ : { ~ : ~ ~ ~ i : ~ ~ I ~ ~ i ~ I i : : ~ : : : :.. ..... ._ '~ ....~ ~ .... ~...: ...... a ............... ' .....~ ~..4.-.
'--*-'~-+'--"t '+'4"~"~" ...+.+..f..-t...+...,....~ ....... +-.-+--+-+-- ..~---+-..~.--r-. "?-¥'r'~ ....... *-~'"*'"~ ....... t ....... *-' --*" '"r"{ ...... r'-?'r--~ ...... T'"r',"~ ~ t J { ~ ~ .
= ..... , .... ,.,, i, ........... .............. ,..., ....... ........ ,. 4 .... , ....... L,-..+...+..-
-4~ .... *-~- -~-t~-~-""*--t~"~"'-'¢--+-*--~ ........ ~"* ....... T'~-*~' '-'~-"~"*" r". · %. T : ~ . , . i ~ ,
~-4 .... ~-~--~ ........................~ ,---t ....... ~ .... ~- ~.~--.r--?r. , ~ ~ ~ ~ ~ "" I
..,, ..... ..... ...... ....... ,_,_,..., , ........ ....... ............. .... _..+_.., .......... ,j..., + ,..,... ...... ......
, ~ . ~ ,,,. ........... ,.. , ............. . ............................. , .............
--'..-~-,-,.-.+++, .... ~-++.+--.-+-+-?---~ ....... ,.+.+-+-~-+?+-? "?r-~'"~'"-'H-T'+--T"~-rT'~-'r"r"~"~ ....... ?"?'t"~"'r"~"-r"rq"T ~ t t ~ ~ t ~ ~ t
} ~ ~,,, i,' ........ ' ,~ 4~ *'', ~ ~ ,' ,~', ' ~ ~,z:+ 4~1 ................ 1 .......... ~ .......
-~ ..... ~+-~... -?-+.-4--~-~-+--?+--+--.'.+-+'+-?'-~--+'++, ...... *'.'~'+"~'"~'T .... .74-.-~ .... ,.+'~+-?-'r".'--r"r"~-?"r"{'":"', ..... ~ ...... ~ ...... ."T",' ~
~ , , : : ~ ....... : , ~ .-4 ~-+..4..4...~.4. .+.~...~.; ;...,...~...~..., ...... }..+..~...4 ...... T"' ............... ~"'*"+'~ ' + t-.t .............. ,...t..-
-.~-.~ }..4....-+-4.4.---.~--.{.-.{.-4--.+ ...... ~-+.4---.~ ...... ?-.?--.:-~ ~ T'?~ ~ ~ · , · , , · · , . .... i i i ; i , , , = .... . ,
-~4~-~.~4.+.. -*-~-~-4 ..... ~..4..~-~ ...... ~...~....~.+~.+,+~ ...... ~-+~'+"'L~-++i-+f'~'i ..... f'?~'~ ....... r-r'-f'~ ...... 71"+" "!"~q"i ....... f"fl'"~ '"~"'t'"f"~ ....... N-TI'
' ' ~ ' ' ' ' ' ' · + 4 ~ + + + ..~ ...... ~-'-+ .... ~' ~ ....
, I * . z . * 4 4 ' ' ' --' ...... ~--4.-..~. ~--- ¢ ' 4 ........ ~ --.~ ............ +--*-"--~'~'" "~"-~-'+"'¢'"*"'+ ....... + ' ~ ' ~ ' ~ t ~ , , ? T , , '
.... ~--74~.-.,-.~--,---~ ....... ?,--,--,- ~ . . : -+ ~ · ~ ~ ~ ~ 't' ~ .... 1~ · .
~2~ ~i ~ ~ &X ~ ~ ~ ~ ~ ~ i ~ ~.; ..... L..~..~ ~ .~ ,g~ {-4 · ~...{-S-k..~..~-!-4.-b4-..~--~.4 ...... ~...*.-T--~ ...... ~..1--+.4 ...... +--+-+--{ ...... 0.+-.f.-~ ....... +-4..+..?
~t~.! !- ~T~']-"i'".{-~i ....q i ..... T'] ....... I-T7] i Z ~ T~ ' ~ 14- ,4 ¢ 4 44--4--'-.~-4 4 1, ~ }...i..k.i 4. 4..~..,...i ..... i*''l'"i'"*"4 ........ ,'...i._i...~., ...... ~.-.i...}...
,=,, .... ...... ,...,...,...+ ....... ...... ,..,......., ..... +.....+., ....... I ...... ...... , ...... ,.--+-..
· .~ L.. L ~. ~ ..... .-.~..~- -.~..~.4.-~ ....... ~.-4--4.-~......4..~...i..J- ..~. '...' ...L..=_~.~ ..... *...~--{-..~-..--*.-4 ....... +...-+~..+-.~'--'+'~"+"* ...... .'".'"~"'~ ...... T'T"*'"~ ........... *'"* ...... ?-,'"7"r"
, i 1 : t I ~ ~ ~ i ' ~ ~ ~ ~ ~ ; ~ ; ' ~ ' ' : ~ : ~ '4-4 -. '-.-'.. '--~ ...... ~---4--.~-..~.-.-.4--.~--4--.~ ....... +.--~-.-4-..~ ...... ~--.~--.~...~ ...... ¥-~.-¥"~ ......... ~'"'"~ .........
~~T*"''4'+~"~ ....................................................... ?-...--~ ...... ,--?-.-~ --~----+ ..... ~ + .... ~ , I . ~ .
. ~ ......................... ~ .... , ...... , .. ........... , .......... ~ ..........................,.~ ~.-.+ ........
~'~ ....... ~*"~"4"4 ...... ~"'~"4"~ ...... 4--,*----~"-~'" ;---4---~----~.-'4---'--4---4---+--4---~ "'+--t'"*-4-- h'?-~'~'"* ....... t"~"'*'"?'"~-'~'"~'", ......... ~"'~'"?'"? ....... ~"? ~ t ~ ? * *
-[ !-.~.~.]~.~-~-Z~-- ~ ~ ~..~.4.4.4.-..t-.4.4....~..¢.....4.4.+4 ...... ~-+.4..4-..44.4.-.+ ....... N.-.Gq.+i...f.~ ...... ~-~.~-'+'f"+ ...... ~'++-~ ....... f"f"t'"t ...... t"t'T'~ ......
~ ! I ~ i i - j ~ i ~ i i ~ ~ ~ J ~ : ~ ~ i ' : ~ ' i ~ ~ ~ ~ ~ ~ ~ : ~ ~..'.4...: ...... L.*...L.4 ..... LA...L4 ...... L.~...L..~ ....... :...~...~...¢...~
: ~ ! ~ ~ ~ . : . , : : : : , : , ~ : * : ! } : : ** .. '....-~.-~-~.-~ ....... ¢..+-~..*...~ .*.+.-4-*+--~ ..... *-..¢..4-.4 ....... +'"4"'*'"'*"1 '"*'"+"~"'* ....... t'*'?T"'~ ...... ~'"*"'r"t ....... ?,...-,**-r
~'f' ~'"'F ,":~-'"T'T'?T'~-'T"T'T"T"F'T'~-T'T"-T'TTT-~"T'TT~ ~ ~ ~ ~ ~ i , ~ ~ ~ ~ . ~ ; ~ ~ ~ ~ ~ ....... ~...:..4 ...... ~..4...*..~ ~ .... ~ : '
· '~ .... ,, ..... rT','] ....... ~",'T'~2"T-?"CV. ~.,.. ~..d..,.4_~.4_~.~_,..~+...,.~_~.4.4-..~..¢44-~..4...~..~...* ..... F'* ....... * ...... ~"'~'+'*"'~"+"*'"~"'~ ...... H-.4.-'~ ...... ¥.¥4...+ ..... ~-.+-+-.~..-~
::~:: :'~ :~ ~ ......... ~ .... ?"?'~"-~ ....... ? ? ? ~ '/ · ' / j ' : ! ~ ~ :
~g~.~-- -4-~-~...~. · -~..~ -~ ...~.-.i..~..~ ........ ~--~-.~--4.-~--~..-4..-4.-~ ...... ~.-+-+-., ....... %+--+-.i ....... ?i'"l"-?"~ "+'+"?'"' 'T"T'"F'~ ....... ~'"~-t"~"'~ -'~ ...... T"~ ...... %','";'"~ ......
4-~-.L ..... ++ -~ ........ ~ ........ ,.~.-~ ...... ~.--,.~..~ .... +. -+.-r--?-.? -- r. ~ . i ~ , ' ' , .
~ + i ~ , , ~ i ' , .............. ¢ .... ~ ,4-. , ..... ,..., ......................................... ~ ..........~ l....t ....... *"'1"';"'*"+"~ .......... r..* .
' -4-1 ..... ~-~ ..... 4 ~- -* .................................................. ~-","~ ......... ~-,.'-t"* ........
~ . : , ~ --T t ~ : ' : ' ' ' ..... , .... : : : : : ' ; { ¢ ¢ ;.-~...; ...... ;...)..4. *- ; ..... ; ....... ;-..*....~-.-4.-.
· · · : · ~ '-'~ ' ~ ' 4 -~---~--~.-.{----~---~---:---~---+..-~--* ....... ~'"~--~-'~ ...... +.---'~---* ...... *'"~'"*"'* ...... ~ ' · ' T . ....... ~ :
3O
NORTH
PROJECTION ON VERTICRL PLRNE NORTH - SOUTH SCi:lED IN VERTICAL DEPTHS HORIZ SCRLE = 1/10 IN/FT
PERMIT # ,,/~ - 3 ,.~ WELL NAME ~,~.~ ,,~,~v,~ ~ /~
COMPLETION DATE ~ i/~ i ~ CO.~'~'~ ~
~1~ I~ i ~
] "AOGCC GEOLOGICAL'MATERIALS INVENTORY LiST
( check off or list data as it is r~ceived ) , ,
,,riff? [ /'o/~/~ drillin~j histor~ '~/ survey l~"/~,[[tests J ,core de~fiption] '
·cored intervals core analysis dry, ditch intervals digital data
·
I .......... I I , , , , ,
"' LOG TYPE ...... nUN' iNTEI::iVALS ' scAIF '
NO.
~ ~/~. ~; / ~'- ~~' ,-,,,
~' ..~,.-~ ~ Z~ .... / V~' - ~~' ~"
c ~T / ,, ?& / - ~&~° ' ~"
........
7) c~ ~ / ~ /- ~2~&/ ~"
.....
/ ~1~, ~',
~1 ,
...... ,
A i'q C FI F) R A G [-", A I.. A 2 K A
995'.
DATE'
REFERENCE' ARCO CA~'E:D HOI_E F'INA[..2
/i -"2 8- i (':'-90 F'ERF RECORD
4-~ 8-i:3-9¢: DUAL BUR2T TDT-P
- 5 - i i 8 - 7 - 9 () C. 0 L t_ A R / I::' E R F
5-i4 '?-ii-9(3' DZAGNOS"TZC I"-M
~:- ~ 4- c:_
~.: i i - o t.') P E R F' R E C 0 R D
,~.,
.. 6--,; 8- i i -9;.'-) COLLAF'.'./F'ERF"
.6 - "-2 4 8 -" 9 "- 9 0 C N L -(.; R /C: C 1_
· --'?-27 '7-27-9t-'.~ I NJECI' t Oi',! PROFILE
· -'T-33 8-i i-90 COL. L. AF;'./I::'ER.F'
o -'.~':., ?-28-9(:;, ]: N,JFZf~T'r ON F'ROF.I: LE
· · ..._ ...... ~
· -.-.o- 4".~., .: .... 8-5:-9,::) CBT
--9--42 ,c~_,:,-._~,F.;.., ..,- , ._. CET.
· i i-4 ~:: .... v--9(.) CNL..-[~F;:/'L':CI...
~ i '-2..¥ 8- i 2-9('} COL. I_/4F;~'/F'E.:.RF'
~ i 2'- S 2 '? .... '-25 - 9,:.'-) F' R 0 !::: U C'f' ]: 0 N P f;.'. 0 F:' I LEi.
.... '; =- 90
..i'~'- ," ,::,--_~- r EI".F RIFCI. JRD
~ 3 - i~':' 7 - .-_. '''~ ,_, '~: --o: ;':":. D 't A C: N 0 E.' i" i F:... F H
· .. P k:r,..I'- REf":K~'D
j S'- t ~ 8-4-9;:; '~'-""-
..... ~_.~ ~: _ o,-:'-, F'RFiOI iF'.-i" T f'ii'..~ PRFiF't LEE
.
......-P W D W i-'~ 8-'7-9 G., CCI_
RUN
RUN
R U N
RUN
R U N
RUN
RUN
RUN
RUN
RUN
R l.I N
R U N
F.:UN
R U N
J:;.'. U N
!:;.'. l.j N
R U N
R U N
RUN
RUN
F'LEA2E eIGN AF!D RETURN :"~'- D
~--. , I-,t::. ATTACHE
F,'~ .... :IVED B
HAVE: A [:,A",". /
AU6 2 2 1990
SAi_LY HOF'F'ECKFR
C: 0 P Y A ~-: R E C E.': t P T 01::' D A i" A
A P P R 0 V E D .~"~jJ_~ '~~
'i'RANi::~ 9'".255.S i '
i
1
i
'i,
i
i,
i
i,
i
i,
i,
i,
i,
i,
i,
i,
2CH
2CH
A'i-LAJ?
CAMCO
2CH
A T I_ A
A ,~ LA.';'?
C A m C 0
ATLA2
C A M C 0
~'CFt
/<JCH
A 'T'L A g'
CA~CO
~CH
C; A ~-i C 0
YCH
C A M C 0
A'TLA:~
DI£'TRIBUTION
~ CENTRAl_ FILES
-.- CHEVRON.
D & M
~ EXTENSION EXPLI_']RAT I ON
~~ EXXON
MARATHON
~- MOBIL
F'H I I_L lI-~""
F'B WELL F']:L. ES
R & D
BF'X
~;TATE OF ALA~'KA
TEXACO
* TFIE AF'I~: FOR ii-23 I$ 5,"~--~)29-2i6i~.
** THE CORRECTED AF'I~ FOR iS-'7 12
STATE OF ALASKA ........ ' '
AL ~A OIL AND GAS CONSERVATION COMM, _,ON
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon ,-- Suspend__
Alter casing __ Repair well
Change approved program ~
Operation shutdown __ Re-enter suspended well __
Plugging ~ Time extension m Stimulate ~
Pull tubing ~ Variance ~ Perforate ~ Other
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360 Anchorage, AK 99510-0360
4. Location of well at surface
761' FSL, 252' FWL, Sec.31, TllN, R15E, UM
At top of productive interval
728' FSL, 261' FWL, Sec.31, TllN, R15E, UM
At effective depth
729' FSL, 260' FWL, Sec.31, TllN, R15E, UM
At total depth
730' FSL, 259' FWL, Sec.31, TllN, R15E, UM
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
RKB 62'
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
PWDW 1-2
9. Permit number
90-33
10. APl number
50-- 029-22024
11. Field/Pool
Cretaceous/Unde fined
feet
12. Present well condition summary
Total depth: measured 6005'
true vertical 6005 '
feet
feet
Plugs Iimeasured)
4000'-4126'
Class 'G' cmt (7/19/90)
Effective depth: measured 5900'
trueve~ical 5900'
feet
feet
Junk (measured)
Parted 9-5/8" casing @ 3930'
Casing Length
Structural
80'
Conductor
3435'
Surface
Intermediate 5958'
Production
Liner
Perforation depth: measured
Size
20"
13-3/8"
9-5/8"
true vertical
4130'-4220' squeezed
4406'-4430' squeezed
4130'-4220' squeezed
4406'-4430' squeezed
Tubing (size, grade, and measured depth)
Cemented Measured depth
2850 # Poleset ll2'MD
2000 sx CS III & 3467'MD
600 sx Class G - Top job w/250 sx CS II
3000 sx Class G 5988'MD
Packers and SSSV (type and measured depth)
13. A~achments
~ueverticaldepth
ll2'TYD
3467'TVD
5988'
Description summary of proposal __
RECEIVED
AUG 2 o 1990
Alaska 0il & Gas Co~s. ~
chorag ....
Detailed operations program ,," BOP sketch
14, Estimated date for commencing operation 15. Status of well classification as:
ally approved Oil __ Gas ~ Suspended
Mike Minder 8/20/90
Name of approver Date approved Service __n~ ~ .... ~ W¢,11
17. I hereby certify that the foregoing is true and correct to the best of my knowledge~
Signed
Title Drilling Analyst
FOR COMMISSION U S'l~ ONLY
Conditions~ approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~ Location clearance __ ~c, ?
Mechanical Integrity Test ~ Subsequent form required 10-.
ORIGINAL SIGNED BY
LONNIE C. SMITH
Approved by order of the Commissioner
Form 10-403 Rev 06/15/88
Date
] ] 4/Sl%pprova' No. ¢ ~ .-,/Zg.~,c~J
~,i~t3vmJssioner(':.nm
Date 8 I~.(~~
SUBMIT IN TRIPLICATE
P JW 1-2 PLUG AND ABANDON~,..~NT
PROCEDURE
1. Run in the hole with metal muncher mill assembly. Mill the 9-5/8" casing to + 3625'.
2. Run in the hole with 13-3/8" R'I-rS. Set R'I'TS at 3450' and pressure test the 13-3/8" casing to 2500
psi for 30 minutes. Release R-I-rS and POOH.
3. Run in the hole with 5" drill pipe and 1000' of 3-1/2" stinger to 4100'. Circulate and condition mud.
4. Mixand pump 800 sx Class "G" + 1%S-1 +0.5% D79+0.2%D46at 15.8ppg. Spot cement as
balanced plug from 4100' to 3300'. Pull out of the hole.
5. Run in the hole with retrievable bridge plug and set same at 2000'. Run in the hole with RTTS and
storm packer, set the R'I-rS (2) joints below casing hanger.
6. Nipple down BOPs. Inspect casing head and replace as necessary. Nipple up BOPs and test same.
7. Run in the hole and retrieve RTTS and storm valve. Run in the hole and retrieve RBP at 2000'.
8. Run in the hole and tag cement. Test cement and casing to 2500 psi. Clean out cement to 3500'.
Spot additional cement plugs as necessary to establish a P & A / kickoff plug.
9. Pull out of the hole to begin the PWDW 1-2A redrill operations.
13-5/8"
5000 PSI BOP STACK
ANNULAR
PREVENTER
7
PIPE RAMS
6
BLIND RAMS
5
DRILLING
SPOOL
PIPE RAMS
3
TUBING
HEAD
2
1.13-3/8" CASING HEAD
2. 5000 PSI TUBING HEAD
3.13-5/8" - 5000 PSI PIPE RAMS
4. 5000 PSI DRILLING SPOOL
5, 13-5/8" - 5000 PSI BLIND RAMS
6. 13-5/8" - 5000 PSI PIPE RAMS
7. 13-5/8" - 5000 PSI ANNULAR
ACCUMULATOR CAPACITY TEST
1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL
WITH HYDRAULIC FLUID.
2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH CHARGING PUMP OFF.
4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT
IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING
PRESSURE.
BOP STA(~K TEST
1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR
SEAWATER DURING SUMMER MONTHS.
2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED.
PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT
IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD.
3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES
ON THE MANIFOLD.
4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES.
5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES.
BLEED TO ZERO PSI.
6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PiPE RAMS.
7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES.
8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM
PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED
MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND
WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI.
9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE.
CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED
TO ZERO PSI.
10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND
LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE
DRILLING POSITION.
11. TEST STANDPIPE VALVES TO 5000 PSI.
12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP.
13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN
AND SEND TO DRILLING SUPERVISOR.
14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY
OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETION/
WORKOVER OPERATIONS, PERFORM COMPLETE BOP TEST EVERY 21
DAYS AND FUNCTION TEST BOP WEEKLY.
DAM 11/20/$9
BOP SCH
(FOR: NAB 2ES)
ARCO ALAS'KA, Ii"~C~
P.O. BOX i;,D0360
ANCHOF.'Ar;E, ALA2KA
D A T F · 8 - 8 - 9 ¢,
REFERENCE- ARCO C:A2ED HOLE F'INAL2
'i ':'.- ' ' ;'--- -':-':' ;"') D U A ~ B U IR S' '1' '1' D ':T- F' iR U N "i
· S- :5 8--- 'i -- 9' (:.)F' E{ Fi'. F F;..' E: Il:: 0 R TS.', F;.'. U N 'i ,
-"~--,'3 "~ "': 9"
,' -,:,',- ? (;, 1:' tS F,,' i= RIEC Ot;,'D F,'UN
· -t.--7 '?-2.¥-.90 PERK RECORD RUi'..~ i,
4- i 2 '? .... 2.."5--'"i.:":'::' F'ERF I:..'ECORD iRUN i ,
z: - ~i '~ ::~ '" :"""; - ':;'":" C 0 I.. L A R / P E F;.'. F RI J Ni
5 - '._'5.- '? '- '2 '- 9 ;5 F' t.--_ F;,' F R F C 0 R D R U N i ,
~""-...'- - ~ 4 "'-2","'-9':.')r "f'EHP/NOI2E .... F;.'.~ li".J i,
6-S 8-'i-9':'::, CCL RUN i,
7-.5~"; 6-24-9,::') F'ERF Ri.::COF,'D F;.'.Llix! i ,
i 3-5:. 5""~ 6-9'.':::, F'ERF RECCJRD RUN t ,
i 5""26 '?-28-",--"'(~ TB5 CLITTER R. ECORD F;.'.UN 'i ,
i 5-i 9 '7-'i 8'-9~.::' BRK-DOWN TEMF' RUN t ,
F'WDWi-2 7-2i-',°'::).. LEAK DETECTION/F'IT:~.: F;:UN t ,
F'WDW'i-'"' 7-'.-"~-':;'r.D t_EAK i)E"I'EC'TIO.~'~/F'IT$ RUN ")
F'I_EASE ,?;IGN AND t:i'.E.{"I"LJRN THE ATTACHED COPY A,S' REC:EII::'T OF' DATA.
RECEIVED BY
HAVE A NICE DAY!
~- CENTI;:AL FILES ,,-'"' F'HII_L-TF'2
~ CHEVRON F'B WELL FILES
D & M R & D
· .- E,.TEN$ION EXF L~R~TION ~ BPX
- EXXON :~.
· .. STA"I'F' 01:'" ALA2KA
MARATHON TEXACO
,,- MOBIL
C A H C 0
S' C: H
Z C I'-t
.? C i'-t
ZCH
A "F I... A S'
i..t !_ ;-'...'t
S' C 1.-t
A'¥ I... A
HI_Z
I.-tL_:~
2 C I..I
C A H C 0
C A Pi C 0
C A i'i C 0
STATE OF ALASKA 0 ~ ~ ~ I ~_! ~ ~_
ALASr,,A OIL AND GAS CONSERVATION COM,v,,~SION .
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 Status of Well Classification of Service Well
PRODUCED WATER DISPOSAL WELL
OIL [--"] GAS E~ SUSPENDED E~ ABANDONED r'~ SERVICE [~
2 Name of Operator 7 Permit Number
ARCO Alaska, Inc 90-33
3 Address 8 APl Number
P.O. BOX 100360, Anchorage, AK 99510-0360 50-029-22024
4 Location of well at surface 9 Unit or Lease Name
761' FSL, 252' FWL, SEC 31, T11N, R15E UM i LC~A?'i~;;~i'q5 i PRUDHOE BAY UNIT
AtTop Producing Interval ! V~:.,~ic~l~ i 10 Well Number
728' FSL, 261' FWL, SEC 31, T11N, R15E UM~ ,~i ~,~r'~._.J~. · PWDW1-2
At Total Depth ~_..~ 11 Field and Pool
730'FSL, 259'FWL, SEC 31, T11N, R15E UM CRETACEOUS/UNDEFINED
5 Elevation in feet (indicate KB, DF, etc.) J 6 Lease Designation and Serial No.
RKB 62'I ADL 28326
12 Date Spudded 13 Date T.D. Reached 14 Date Comp., Susp. or Aband. I 15 Water Depth, if offshore 116 No. of Completions
03/18/90. 03/25/90. 6/10/90* )E../P~,,/I N/A feet M SEI' 1
17 Total Depth (MD+'rVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey 20 Depth where SSSV set 21 Thickness of permafrost
6005' MD/'FVD 5900' MD/TVD YES [~] NO [-] 2223' feet MD 1900' (approx)
22 Type Electric or Other Logs Run
GR/CAL, CCL, CET/CBT, GCT
23 CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 SURF 112' 30" 2850# POLESET
13-3/8" 68.0# K-55/L-80 SURF 3467' 17-1/2" 2000 SX CS III & 600 SX CLASS G
TOP JOB W/250 SX CS II
9-5/8" 47.0# L-80 SURF 5988' 12-1/4" 300 SX CLASS G
24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) ,PACKER SET (MD)
7" 3263' 3200'
4136'-4226'MD/TVD W/4 SPF, 120° PHASING (Squeezed)
4410'-4434'MD/TVD W/4 SPF, 120° PHASING (Squeezed) 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC
These perforations were squeezed in Mid- DEPTH INTERVAL(MD) I AMOUNT & KIND OF MATERIAL USED
July as per Application for Sundry approval 4448'-4450' ]750SXCLASSG&24BBLMSR-100ACID
dated 7/3/90. That information will be ... (SEE COMPLETION WELL HISTORY FOR DETAILS)~
submitted when complete on a subsequent Sun(.r7. I
27 N/A PRODUCTION TEST
....
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
I
TEST PERIOD ,~
FIowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ,~
28 CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
NONERECEIVED
·
· NOTE; DRILLED RR 3/29/90, TUBING RUN 6/9/90, PERFORATED WELL 6/10/90. i;;[.~j(~ OJj.~
Gas
Cons,
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. ~30.
GEOLOGIC MARKERS FORMATION Ti
NA,NE .. Include interval tested, pressure data, all fluids recoverd and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
UGNU SAND 5525' 5525'
UGNU C 5525'-5907' 5525'-5907'
UGNU B 5907'-5994' 5907'-5994' NONE
WEST SAK 5994' 5994'
31. LIST OF ATTACHMENTS
ADDENDUM (SIGNED 4/27/90 & 7/27/90)
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed /i~ ~~ ~~.,/__ Title gRILLING ANALYST Date
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion repeal and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
ADDENDUM
Well # PWDW 1-2
Date: 4/8/90 & 4/22/cjq
Work performed:
Cost:
AFE: AS3536
4/8/90
MIRU Schlumberger.
Ran CET/CBT/GYRO, Bond very poor. Ran gyro very slow. It did not want to work in
straight hole.
CET/CBT both show bonding @ 3500'-_+3700'. This is very unlikely. Cement
volume was calculated by using 4 arm Caliper of hole +15% excess, to bring cement
above Hoss tool @ 5000' cement should be +_270' above Hoss tool.
4/22/90
Ran CET, CBT, GR/CCL w/ 1500 psi f/5822'-3000' Log interpretation:
cement bonding through most of logged interval.
No BPV installed.
Very poor
DRILLING SUPERINTENDENT
ADDENDUM
Well # PWDW 1-2
Work performed: INITIAL PERFORATIONS
Cost: $25.000
Date: 6/10/90
AFE: AS3536
Time Summary
1030
1715
1855
2025
2216
2323
0022
0130
MIRU Atlas.
Shoot gun #1 f/ 4430'-4434' & 4186'-4196'.
Shoot gun #2 f/ 4424'-4434' & 4176'-4186'.
Shoot gun #3 f/ 4216'-4226' & 4166'-4176'.
Shoot gun #4 f/ 4410'-4424' & 4156'-4166'.
Shoot gun #5 f/ 4206'-4216' & 4146'-4156'.
Shoot gun #6 f/ 4196'-4206' & 4136'-4146'.
Rig down.
Press test equip. RIH w/3-3/8 JJ gun, @ 4 spf, 120° phasing.
Bottom 4' did not fire.
POOH.
POOH. All shots fired.
POOH. All shots fired.
POOH. All shots fired.
POOH. All shots fired.
POOH. All shots fired.
Perf summary: 4136'-4226'
4410'-4434'
Perforated w/ 4 spf, 120° phasing
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon __ Suspend __ Operation shutdown __ Re-enter suspended well __
Alter casing __ Repair well __~ Plugging __ Time extension __ Stimulate __ P, eDalr Channel
Change approved program __ Pull tubing ,,,' Variance __ Perforate ~ Other __~
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB)
ARCO Alaska, Thc. Development __ RKB 6 2' feet
Exploratory __
3. Address Stratigraphic __ 7. Unit or'~roperty name
P.O. Box 100360 Anchorage, AK 99510-0360 Service_~_~ Prudhoe Bay Unit
4. Location of well at surface 8. Well number
761' FSL, 252' FWL, Sec.31, TllN, R15E, UM PWDW 1-2
At top of prodUctive interval 9. Permit number
728' FSL, 261' FWL, Sec.31, TllN, R15E, UM 90-33
At effective depth 10. APl number
729' FSL, 260' FWL, Sec.31, TllN, R15E, UM 50-- 029-22024
At total depth 11. Field/Pool
730' FSL, 259' FWL, Sec.31, TllN, R15E, UM Cretaceous/Undefined
12. Present well condition summary
Total depth: measured 6005' feet Plugs(measured) 4100'-4126' Class 'G' cmt (7/19/90)
true vertical 6005' feet
Effective depth: measured 5900' feet Junk (measured) None
true vertical 5900' feet
Casing Length Size Cemented Measured depth True vertical depth
Structural
80' 20" 2850 # Poleset 112 ' MD 112 ' TVD
Conductor
3435' 13-3/8" 2000 sx CS III & 3467'MD 3467'TVD
Surface 600 sx Class G - Top job w/250 sx CS II
Intermediate 5958' 9-5/8" 3000 sx Class G 5988'MD 5988'
Production
Liner
Perforation depth: measured
4130'-4220' squeezed
4406'-4430' squeezed
true vertical 4130' -4220' squeezed
4406'-4430' squeezed
Tubing (size, grade, and measured depth)
7", L-80 tbg w/tail @ 3263'
Packers and SSSV (type and measured depth) '"~ "~ ~"
Camco "Bal-O" SSSV ~ 2223' & AVA "PRB" ~)kr ¢. 3200'
13. Attachments Description summary of proposal __ Detailed operations program
14. Estimated date for commencing operation 15. Status of well classification as:
August 8. 199(]
16. If proposal was verbally approved Oil __ Gas __ Suspended __
Name of approver Date approved Service Disposal Well
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~,~~ ~,4xJ~ Title Drilling Analyst Date
Qp FOR COMMISSION USE ONLY ll4/SA4
Conditions of provah Notify Commission so representative may witness [Approval No.
Plug integrity __ BOP Test ~ Location clearance __
Mechanical Integrity Test X. Subsequent form required 10-
ORiI31NAL SIGNED BY Approved Copy
Retl~rned
LONNIE C. SMITH :g/b
Approved by order of the Commission commissioner Date
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
. , fDW 1-2 PROCEDURE SUMMAix f
OBJECTIVE:
The primary objective for this workover is to establish isolation behind the 9-5/8" casing. It is
planned to perforate the well from 5050' - 5060', 600' below the existing SV1 perforations at
4130'- 4220'; 4406' - 4430' and the old squeeze perfs at 4448' - 4450'. A baseline Temperature
/ GR log will be run prior to perforating. Following perforating, 150 degree produced water will
be injected into the lower perforations for 24 hours. Another Temperature / GR log will then
be run to detect any channeling to the old perforations. If channeling is found, the lower
perforations will be squeezed with cement and the injection and the logging procedures
repeated. A maximum of two cement squeezes will possibly be performed on the lower
perforations. The injection and logging procedures will be performed after each squeeze.
Following the work on the lower perforations, the old squeeze perforations at 4448' - 4450'
will be isolated from the lower perforations and the injection and logging procedures will be
repeated. If isolation can not be achieved at any of these points, the well will be plug and
abandoned. If isolation can be established, one last cement squeeze will be performed on the
upper perforations at 4130'- 4220'. The well will then be completed with a 5-1/2" tubing
straddle assembly covering the interval from 4000' - 4500' and 7" tubing to surface. The
procedure below outlines the three injection /logging tests and two cement squeezes at the
lower perforations, the injection tests at the old squeeze perforations, one cement squeeze
at the upper perforations, and completing the well with a straddle assembly.
PROCEDURE:
1. MIRU Nabors 2ES.
2. Kill well if necessary. N/D tree. N/U BOPs.
3. Pull and lay down tubing.
4. RIH with mill and PRT. Mill and pull AVA packer at 3200'.
,
RIH with 8-1/2" bit and 5" drill pipe. Clean out to PBTD. Circulate fresh 9.1 ppg seawater around.
POOH.
o
RIH with RTTS to 4100'. Pressure test casing to 3000 psi for 10 minutes. RIH to 4440' and set
R-FT'S. Pressure test old squeeze perfs at 4448' - 4450' to 1000 psi. RIH to PBTD.
7. R/U Camco unit. Run base line temperature log from PBTD to surface. R/D Camco.
8. POOH to 5035'. Set RTTS.
9. R/U E-Line. Perforate from 5050'- 5060'. R/D E-Line.
10. Tie into Flow Station #1. Inject 150 deg produced water into lower perfs.
11. Release R'I-I-S. RIH to PBTD.
12. R/U Camco unit. Run temperature log from PBTD to surface. R/D Camco.
13. POOH with RTTS.
,. , CDW 1-2 PROCEDURE SUMMA~ f
14. RIH with EZSV on drill pipe. Set EZSV at 4735'.
15. Squeeze perfs with cement.
16. RIH with 8-1/2" bit and 5" drill pipe. Clean out to PBTD. Circulate fresh 9.1 ppg seawater around.
POOH.
17. RIH and set R-I-I-S at 5000'. Pressure test squeeze to 1500 psi.
18. Tie into Flow Station #1. Inject 150 deg produced water into lower perfs.
19. Release R-l-rS. RIH to PBTD.
20. R/U Camco unit. Run temperature log from PBTD to surface. R/D Camco.
21. POOH with RTTS.
22. RIH with EZSV on drill pipe. Set EZSV at 4725'.
23. Squeeze perfs with cement.
24. RIH with 8-1/2" bit and 5" drill pipe. Clean out to PBTD. Circulate fresh 9.1 ppg seawater around.
POOH.
25. RIH and set RTTS at 5000'. Pressure test squeeze to 1500 psi.
26. Tie into Flow Station #1. Inject 150 deg produced water into lower perfs.
27. Release R-i'TS. RIH to PBTD.
28. R/U Camco unit. Run temperature log from PBTD to surface. R/D Camco.
29. Release RTI'S and POOH.
30. RIH with drill pipe and EZSV. Set EZSV at 4500'. POOH.
31. RIH and set R-I-I-S at 5000'.
32. Tie into Flow Station #1. Inject 50,000 bbls of 150 deg produced water into perfs at 4448' - 4450'.
33. Release R-I-i-S and POOH.
34. RIH with drill pipe and EZSV. Set EZSV at 4250'.
35. Spot cement and POOH to above TOC. Perform bradenhead squeeze. POOH.
36. Wait on cement for 18 hours.
37. RIH with bit and clean out to the EZSV at 4250'. Test squeeze to 1500 psi. Clean out to PBTD.
, , ¢DW 1-2 PROCEDURE SUMMA_,x f
38.
RIH with 9-5/8" R'I-FS to 4100'. Test 9-5/8" casing to 3000 psi for 30 minutes. POOH.
39. R/U Schlumberger. Run CET / CBT / GR from PBTD to surface. M/U lower packer assembly and
RIH. Set packer at 4550'. R/D E-Line.
40. M/U upper packer and 5-1/2" straddle seal assembly. RIH with packer on drill pipe. Sting into lower
packer. Set upper packer. Test packer and casing to 3000 psi.
41. POOH and lay down drill pipe.
42. Run 7" completion assembly with SSSV. Displace well to seawater and freeze protect. Sting into
upper packer and land tubing.
43. Test tubing to 3000 psi. Test packer and casing to 3000 psi. Pressure tests are to be witnessed by
the AOGCC.
44. N/D BOP, N/U tree. Test tree to 5000 psi. Pressure down the tubing to shear the shear out sub.
45. Release rig. Turn over well to Production.
o ESTIMATED BHP:
o WORKOVER FLUID:
1991 psi @ 4400' TVD / MD ( 8.7 ppg EMW)
9.1 ppg NaCI Brine
13-5/8"
5000 PSI BOP STACK
I I
ANNULAR
PREVENTER
7
PIPE RAMS
6
BLIND RAMS
5
DRILLING
SPOOL
PIPE RAMS
3
TUBING
HEAD
2
1.13-3/8" CASING HEAD
2. 5000 PSI TUBING HEAD
3. 13-5/8" - 5000 PSI PIPE RAMS
4. 5000 PSI DRILLING SPOOL
5.13-5/8" - 5000 PSI BLIND RAMS
6. 13-5/8" - 5000 PSI PIPE RAMS
7. 13-5/8" - 5000 PSI ANNULAR
ACCUMULATOR CAPA(~ITY TEST
1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL
WITH HYDRAULIC FLUID.
2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH CHARGING PUMP OFF.
4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT
IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING
PRESSURE.
BOP STACK TEST
1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR
SEAWATER DURING SUMMER MONTHS.
2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED.
PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT
IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD.
3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES
ON THE MANIFOLD.
4. TEST. ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES.
5. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES.
BLEED TO ZERO PSI.
6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS.
7. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES.
8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM
PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED
MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPSTREAM OF VALVE AND
WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI.
9. OPEN PIPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE.
CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED
TO ZERO PSI.
10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND
LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE
DRILLING POSITION.
11. TEST STANDPIPE VALVES TO 5000 PSI.
12. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI WITH KOOMEY PUMP.
13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN
AND SEND TO DRILLING SUPERVISOR.
14. PERFORM COMPLETE BOP TEST ONCE A WEEK AND FUNCTIONALLY
OPERATE BOPE DAILY FOR DRILLING OPERATIONS. FOR COMPLETION/
WORKOVER OPERATIONS, PERFORM COMPLETE BOP TEST EVERY 21
DAYS AND FUNCTION TEST BOP WEEKLY.
DAM 1 1/20/89
BOP SCH
(FOR: NAB 2ES)
D A T E · 7 .... 'i 7 .... 9
4 .... 2 '7 '"' 9- 9 (') C CJ L. L. A F;.'. /F:' E R F:' }:,.: l...I r..!
..:i .... ¥ 6 .... 2 ~i: .... 9 (i) e R 0 i() i.j {ii: '¥' ]J 0 i",! e R 0 ,c ]i L. }iil {:if I..j I".i
6 ..... :.? '7 .... 2 ..... i? ::") F' i:;..' 0 D U C:"f' I () N P F:-: 0 t::' :[ 1... E R. ti',.!
,:ii, "" 'i 2,:ii*'"' 2 :"!: .... 9 (:," 'i" B G 'T A iii L. R U i"..!
A .... 'i '/.2 6 .... 2 S .... 9 (:;, p,r.:.., 0 D U E:'f' I E N P R 0 i::' t I.. Iii] R l..j N
"?" '..- 'i 4,:ii, ...-2 4 .... 9 ,:i) F:' R 0 D U C: '¥' i 0 N P R 0 I::' i t... r.'iJ R U i"-.!
7 .... ?-:; S '7 .... '7 ..--9 ;~:, F' E R F; R E C 0 R E.', R i..! i'".!
.9 .... 2 9 ,:ii, .... i]2 ':i; .... 9 (:.:, i::' i::.'. 0 ]0 U C: "i' ]i 0 i"'.! I::' i::..' Cji t:; ]] L. [ii I::.] i...I i"'.!
9 '... S 2 '7 -8 .... 9 (i:, W A 'f' !iii R F i... 0 W ...... C 0 N ¥ E N 'i" I 0 N A I... R U N
o,. .... S 2 T' .--. 8 .... 9 ,.']:, W A ]" ,r..!] R i::' i... (ii kl. ...... ........ I N V E R 'f' iii. D i:~' i IN
9 ..- ].i.~ ]]2 '7 .... :i~, ..... !? (') ]{) O A L B O F:,' ;!ii 'i" T }} '¥'-..-1."-' I:;,' O N
i 2 .... ~i~ 6 - 2 2 .... 9 (.) L. E A K D E'f' E C:'¥' I 0 N R U i"'.!
'i 2 .... '.5 6 .... ':":'" ....
,;....,, .... 9 ;:; L.. E A K D E T iii] E: T I 0 N R U i.-...i
'i 4 ..... i 5: 6 .... ~]!; (-) .... 9 (.) P R 0 D U C: T I 0 N P F;.: 0 F' i I... E I:;.: U i:..!
i 6 - 2 3 '? -9 .... 9 G C: 0 I.. I... A R / PIE R I:; R U N
i::'W D W 'i .... 2 ,:ii,/'2 9 -.-3:6 /9 G T E H F:' ,!';' U R V E Y ( B A ;~,' E L. ! N E ) R U N
Pi...EA;i.;'E ;!; ]:E-N.. AND i:;.:i!:."¥LIRN. THE; A'f'"i'AC:HED COt::'Y A,'~ ,-,..r'"'rt::.... ..... E. :t: F:' 'i" 0 F-" D A'I" A
_/
;ii; A t... i... Y I-t 0 F:' I::'E C 1( iii: t:;.: &l'liS~OBg~ ~-"~'¢"' "
A t::' I::' t:;.: 0 v Iii: :(
A TO .... i ~':'''''''''' .... "-
· ..:. ,::. ::. 'i" t:;,' R N ;:, .,,. ~:' 9 6,
i,
i.,
'i
i
i
'i
D 12' 1' R I B U T I 0 N
:,'~ C E N T R A L F I L. E $ f,-' t::' I"11 L L I F:'
· ,,."" C H E ¥ R 0 N P B 1,4 F.. I... I... i::' ]:'I...1':: ..... '~''...
D & M 1:;..' & D
.II: E X T E N S' I 0 N E X P L 0 R A 1" I 0 N :,": B 1::' X
:',~ li:.:XXON ;~ L,?I"AI'E OF AI...A,".~.'I<.'A
M A R A 1' I.'t 0 N 'f' ii: X A C 0
· '~,: i"i 0 B I 1..
ARCO Alaska, Ir'
Post Office. ,.._,, 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
May 30, 1990
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: 16-22, L5-18, L5-19, L5-26 & PWDWl-2 As-builts
Dear Mr. Chatterton:
Enclosed are copies of the subject As-builts for your information. If you have any
questions, please call me at 263-4618.
Danielle Warner
Engineering Aide
DW
cc: File W1-1
ARCO Alaska. inc. is a Subsidiary of AtlanticRichfieldCompany AR3B q00?-,C
VIONITY ~AP
,~~ NOT TO ,SCALE
.... NOTES .
~ ' I J ~~ ~ L~~ ~ REC~'
L OCA TED WITHIN PRO TRA C TED
SECTION 31~ T. II N.,
UMIA T ~RD~ ALASKA 4J ~~~e F~O ~,
Pfs. 30-33
....... I .......... IIiiii ..... I i I i i,, , .......
WE~L_ _~.S.P. COORDiNATES PLANT ~~TIC POSITION ELEV. LOCATION
I IIII I I I .........
, C~Lkn I~ SEC TION
~o. ,O~_T~6 ~ST/~G . .~OROS. ~T. ..~0~. Box
ii I
I-2 ~946,~01,4669Z~372.4~H 5~,~ ~70,1~,33.~1~*~'~.807' ~.~'
W
........... mi .mil ii i r * r ....... ill III
' ~- .
BELL
A~OCIA
.H ~ ~ ~ ~ . ~ .......
.... ' ........... "-~ CONDUCTOR A~-~UIL T
~ ~~ ~~ ~ S.I.P. C~ETACEOU$ WELL
PWDW I-2
.,, , _ ,,,,,,.,,...,., .... . , . .... ~, ~,,~ ~ ".
~-.. .......... . ,.
3~7 .............. _... "-
~_...0.. ,9~ ,SSU~D FOR INFORMA"~i~ SS'
.................... ~ I~~~' i~,
~ ~ ........ ~zsz~s m ~o,~s~ t oooo '.i C~A-~3tO0-OOtI 0
........ , .............. , ....
STATE OF ALASKA
Al'ASSaIL AND GAS CONSERVATION C"-~!MISSION'
APPLlC rlON FOR SUNDRY Ai-PROVALS
1. Type of Request:
Abandon ,--.-- Suspend ~ Operation shutdown
Alter casing Repair well , Plugging
Change approved program Pull tubing
Re-enter suspended well
Time extension Stimulate
Variance Perforate
2. Name of Operator
ARCO Alaska Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
5. Type of Well
Development
Exploratory
Stratigraphic
Service
4. Location of well at surface
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At top of productive interval
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At effective depth
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At total depth
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
Other ,, X
6. Datum of elevation(DF or KB)
30' RKB feet
7. Unit or Property
Prudhoe Bay Unit
8. Well number
PWDW 1-2
9. Permit number
9O - 33
10. APl number
50 - 029 - 22024
11. Field/Pool
Creataceous Pool
12. Present well condition summary
Total depth: measured
true vertical
6005 feet
6005 feet
Effective depth: measured 6005 feet
true vertical 6005 feet
Casing Length
Structural
Conductor 80'
Sudace 3467'
Intermediate
Production 5988"
Liner
Perforation depth:
Plugs(measured) None
Junk(measured) None
Size Cemented
20"
13-3/8"
RECEIVED
! 1990
~ Oil & ~as Con~. Oommlar~on
Measured ,dapt~r~ical depth
2000# Poleset 11 O'
2000 sx, ColdSet III, 600 sx, Class 'G' 3467'
9-5/8" 300 sx, Class "G" 5988'
measured 4130 - 4220'; 4406 - 4430'; 4448 - 4450' (squeezed).
110'
3467'
5988'
true vertical 4130 - 4220'; 4406 - 4430'; 4448 - 4450' (squeezed).
Tubing (size, grade, and measured depth) 7" / 5-12" (26~ / 17#, L-80 / L-80, 0 - 3195' / 3195' - 3263')
Packers and SSSV (type and measured depth) AVA Permanent "PPB" Packer, SSSV - Camco 7" Bal-O Nipple
13. Attachments
Description summary of proposal X
Detailed operations program ......
BOP sketch
14. Estimated date for commencing operation
June 28, 1990
16. If propOsal was verbally approved
Lonnie Smith 6/28/90
~e of
17. I hereby cert
15. Status of well classification as:
Oil Gas Suspended
Date approved Service Produced Water Injector
that the foregoi is true and correct to the best of my knowledge.
Title Operations Support Superintendent- WelIs/EOC Date
Conditions of Notify
Plug integrity BOP Test .... Location clearance
Mechanical Integrity Test Subsequent form required 10-
so representative may witness
IApproval No./4~)
Approved by order of the Commissioner
ORIGINAL SIGNED BY
LONNIE C. SMITH
Commissioner
Form 10-403 Rev 06/15/88
Julie Heusser/Dave Smith PRB-24
659-5102
Approved Copy
Returned
SUBMIT IN TRIPLICATE
INJEC ON WELL ANNULAR COMMI. ,CATION
VERBAL NOTIFICATION OF AOGCC
PER AREA INJECTION ORDER #4
DATE: June 28, 1990
TIME: 12:00 noon
NOTIFIED BY: Steve Massey
REASON:
AOGCC CONTACT: Lonnie Smith
Injection Well PWDW1-2 Annular Communication
Per Rule 7 Requirements of Area Injection Order No. 4
DISCUSSION: Notified Lonnie that the 13-3/8" and surface were in communication
with some pressured interval which responds to injection. I told him our plans were
to do an injectivity test down the 9-5/8" x 13-3/8" annulus to determine if we
could arctic pack the 13-3/8" annulus. Also we are evaluating the possibility of
squeezing the well.
AOGCC RESPONSE: Verbal response to go ahead with diagnostic work.
Sundry Notice Req'd at this time? YES X NO
PRODUCTION ~PPORT SUPERINT~~T -'
Original to J. Heusser/D. Smith - PRB 24
cc: Production Support Superintendent (S. J. Massey/J. D. Ottoson) - PRB 20
Sr. Wireline Supervisor (K. M. Kennedy/W. S. Wilder) - PRB 20
Field Area Operations Engineer (C. Farmer/J. Ferguson) - PRB 24
DS Supervisor - FS # 1
FS Superintendent - FS # 1
DS Engineer - ATO~
RECEIVED
LIUL 1 11990
/U~ 0Il & ~s C~n,~. Commission
(04/05/90)
Well PWDW J-2
Spud Date: 3-18-90
Original RKBE: 62"
Fop of Sadlerochit: N/A
Annulus Fluid: Diesel/6.8 SW
All De are RKB
,rco Alaska Inc.- Prudhoe L
APl#: ,50029-22024
Completion Date: 6-9-90
Hanger Type: Cameron Gen III
Max Hole Angle: 1.5°
Reference Log:
/ Field
Well Type: Disposal
New I~ Workover I-1
Honger: 30'
Angle @ Top Sad. · N/A
Caliper/GR 3-26-90
Drilling MD to Top of Equipment except where noted.
Jewelry
1 2223'
2 3195'
3 31~'
4 3200'
5 32~'
6 3~2'
7 32~'
Camco Bai-O Nipple (SSSV) ID-5.937
Crossover 7" X 5-1/2"
AVA LSU Locator w/Seal Assembly
AVA Permanent "PPB" Packer
Otis 'XN' Nipple ID=4.455
GBS Shearout Sub
Tubing Tail
ELM Tubing Tail (not Ioggea)
Minimum ID: Otis 'XN' Nipple ID.,4~
5
6,7
Casing and Tubing
13-3/8" 72# L-80 0
9-5/8" 47# I.-80 0
7" 26# !..-80 0
5-1/2" 17# L-80 3195'
3467 Casing
66[X7 Casing
319E PC Tubing
PC Tubing
10
10
Perforation Data (ELM Depths)
~. Zone FT SPF
4130-4220 T3 93 4
4406-4430 T3 24 4
6-11-90 Initial Perfs
6-11-90 Initial Perfs
PBTD = 5822'
TD= 6005'
9
Datum
4C~' SS = 4000'MD
,.SG~' SS = 5000'MD
Revision Date: 6-11-90/by, DM,
Reason: New
Previous Revision: N/A
REPORT OF SUNDRY WELL OPERATIONS 0 RIG iN/ 'L
,
1. Operations Performed: Operation/Shutdown ~ Stimulate . Plugging ~ Perforate ~
Alter casing ,/ Repair well .... Pull tubing ... Other X Completion
2. Name of Operator
ARCO Alaska. Inc.
3. Address
P. O. Box 100360, Anchorage, AK
99510
4. Location of well at surface
761' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At top of productive interval
728' FSL, 261' FWL, Sec. 31, T11N, R15E, UM
At effective depth
729' FSL, 260' FWL, Sec. 31, T11N, R15E, UM
At total depth
730' FSL~ 259' .FWL, Sec. 31, T11N~ R15E, UM
12. Present well condition summary
Total Depth: measured 6 0 0 5'
true vertical 6005'
5. Type of Well:
Development _._
Exploratory ~
Stratigraphic ~
Service X
6. Datum elevation (DF or KB)
62' RKB
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
PWDW1-2
9. Permit number/approval number
90-33/90-150 & 90-250
10. APl number
50-029 -22024
11. Field/Pool
Cretaceous/Undefined
feet Plugs (measured) None
feet
Effective depth: measured 5 900'
true vertical 5 900'
feet
feet
Junk (measured) None
Casing Length Size
Structural
Conductor 8 0' 2 0"
Surface 3435' 1 3-3/8"
Production 59 58' 9 - 5 / 8"
Liner
Perforation depth: measured None
Cemented Measured depth True vertical depth
2850# Poleset 1 12'
2000 sx CS III & 3467'
600 sx Class G - Top job w/250 sx CS II
300 sx Class G 5988'
112'
3467'
5988'
true vertical N o ne
13.
Tubing (size, grade, and measured depth)
7" , L-80 tbg w/ tail @ 3263'
Packers and SSSV (type and measured depth)
Camco 'BaI-O' sssv ~ 2223'~ & AVA 'PPB' pkr ~ 3200'
Stimulation or cement squeeze summery
Inte~als treated (measured) ~ ~
Treatment des~pfion including volumes used and final pressure
14. N/A
Prior to well operation
Representative Daily Averaae Production or In!ection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
.. Subsequent to operation
15. Attachments *Completion Well History 16. Status of well classification as:
Copies of Logs and Surveys run X
Daily Report of Well Operations X* Oil Gas Suspended.
r17. i hereby certify that the foregoing is true and correct to the best of my knowledge.
/l.
Signed '~u v,/, v'-",..z,~~ Title Drilling Analyst
Form 10-404 R/e{/05/17/89
Produced Water
Service Disposal Wgl~
Date 7-1/~- ~0
SUBMIT IN DUPLICATE
ARCO ]nd Gas Company
Well History - Initial Report - Dally
laatrt~Uo~l: Prepare and lul)mlt t~l "IRIUII Rll~ft" Da th~ flrlt WidhlKIly II~ll · will Ii Ipuddld ir worl~vlf il)frill·ill itl Mlrlld.
Daily worn prior to sPudding Ihould bi lummlrlzed o~ the form giving Inclullv~ dltet Mtly.
Diltrlct
ARCO ALASKA INC.
Field
PRUDHOE
Auth. or W,O, ,OAs3536
NORTH SLOPI
~L: 29326
COYOTE
Ii/p®ll hO,
WDW!
-2
50-029-22024
Operator
ARCO
AJCO W.i. 21.7000
]P.o, ,~,tu,,, w.o.
1330 HRS
Spudded or W.O. begun
ACCEPT
Oils Ind d~p~h
II Of 8:00 I.m.
05/29/90 (
I~: 0
PB: 5893
$UPV: 1~O
05/30/90 (
TI): 0
PB: 5893
SUPV: RWO
05/31/90 (
i'D: 0
PB: 5893
SUPV: HWP
'06/01/90 (
TD: 0
PB: 5893
$UPV:HWP
06/02/90 (
TD: 0
Pa: 5893
$UPV: ~
05/28/90
Complete record for alch ally rlpertld
NAB·RS 2ES
2)
3)
4)
5)
6)
~ Procedural U~'~u·l, SeCUMI 10,
Ddlllr~, Pagea ~ snd ~.
RIH #/8.5" GR/JB 9-5/8"0 5988' MN:ll.1N&C1/B=
MOVE RIG F/WGI-5. ND DRYHOLE TREE, NU BOPS. TEST BOPS TO
5000 PSI. PULL TST PLUG. RIH N/3-1/2' DP AND DISPLACE
DIESEL OUT OF TOP 600' OF NELL W/BRINE RU ELECTRIC LINE.
RIH W/4# CSG GUN AND PERFORATE 9-5/8' g 4448'-50' MD. POOH.
RIH W/8.5" GR/JB TO 5893' MD.
DAILY:S25,048 CUM:$1,228,451 ETD:S1,300,000 EFC:$1,578,451
CIRCULATING 9-5/8-g 5988' MW:ll.1NaC1/Br
FIN RNG GR/JB, NO RECOVERY. RUN AND SET BRIDGE PLUG ON WL
AT 4470' MD. RIH W/OPEN ENDED 3-1/2" DP TO 4463' MD. EST
INJ RATE OF 0.2 BPM ~ 600 PSI. MIX AND SPOT 250 SX CLASS 'G'
CMT + ADD ABOVE BRIDGE PLUG. POOH 10 STDS. SQZ 2 EBLS CMT
INTO PERFS 8 4448-50' MD 8 1200 PSI FINAL SQZ PRESS. BLEED
OFF PRESS, CIRC BTMS UP. POOH. PU 8-1/2" MILL AND RIH TO
3506' MD. CBU.
DAILY:S91,339 CUM:$1,319,790 ETD:S1,400,000 EFC:$1,569,790
DRLG CEMENT 9-5/8"1 5988' MN:ll.1 NaC1/B=
CIRC WHILE NOC. RIH, TAG TiC I 3916' ND. DRILL CMT TO
4150'. CBU, POOH. MU 8.5" BIT AND RIH. DRILL CMT TO 4365'
MD.
DAILY:S37,215 CUM:$1,357,005 ETD:S1,450,000 EFC:$1,557,005
RIH W/8-1/2" BIT 9-5/8"8 5988' MM:ll.1 N&C1/Bg
DRLD CI4T TO TOP OF EZSV. CBU. TEST SQZ PERFS. EST INJ
RATE OF I BPM 8 875 PSI. POOH TO 1000' MD. ATTEMPT TO EST
CIRC FROM PERFS TO 9-5/8" X 13-3/8" ANNULUS N/OUT SUCCESS.
POOH. RIH W/3-1/2" MULESHOE ON 3-1/2" DP TO 4450' MD. EST
INJ RATE W/SEAWATER OF 1/4 BPM ~ 1450 PSI. PUMPED 24 BBLS
MSR-100 ACID AND FLUSHED #ITH 20 BBLS SEAWATER @ 1BPM, 1000
PSI. MIX AND PUMP 250 SX (51 EELS) CL 'G' ·MT N/LATEX
ADDITIVE. SPOT CMT ACROSS PERFORATIONS. POOH 10 STDS.
BRADENHEAD SQZ 43 BBLS CMT INTO PERFS. FINAL SQZ PRESS 1030
PSI @ 1/4 BPM. CBU, POOH. MU 8-1/2" BIT A~D RIH.
DAILY:S57,467 CUM:$1,414,472 ETD:S1,414,472 EFC:$1,650,000
PREP TO SQUEEZE CMT 9-5/8"1 5988' MN:ll.1 N&C1/Bg
RIH W/8.5" BlT. DRLD CHT TO TOP OF EZSV e 4463'
ATTEMPT TO TST S(}Z PERF$ #/O SlK~CES$. EST INJ RATE OF 3 BPM
I 1100 PSI. C~U, POOH. M~ 9-$/8" CMT RTNR AND itTH. SET
RTNR ~ 4405' ND. DISPLACE DP #/$F. ANATER AND PREP TO MTX AND
PUMP CMT.
DAILY:S38,319 CUM:$1,452,791 ETD:S1,452,791 EFC:$1,650,000
Dr#ling Supt.
~ :'i;~ INumber iJI dal~y will history /omo co~lvMy Plg~ hO.
· , I. U~y im pmpMid fM .ich wMI.
ARCO C ,tdGas Company
Dally Well History--Interim
Inlln~¢ll. ltl: Thll form II ulld during drilling or woC~ver oplrltlor4. If ~Mi~, coring, Or ~orltlng. ~ Iormlll~ name In ~flbing ~o~ ~0~.
Numar Ill d~ll Ilia lllll leqUlnllllly, Attlch dllcripllOn of MI CO~ Work ~fo~d by Producln~ ~cliofl will ~ m~ed ~ "~Mz~" ~11 unlll ~11
complllion R/pofl officlll or fepre~ntltive IIII on "F~" to~ I) ~mit "~11~" ~11~1 whln filll~ ~! bul not IIII Irlq~nlly ~ t~ ~ ~1~. or (2)
~ Wid~ldly of lhl wllk In which oll ItrmO il ~t. S~bmit wHkly ~r Ior~ ~d following ,lling of oil Itrin9 u~lil ~mpleh~.
Dtltrict 41~C0 ALAS~ INC. , 1CoumY or Perilh NORTH SLOPE IsIItl
Field PR~HOE ~Y Ic.~ o, u,it P~W1-2
Complete mco,~ for e~~ ~ or ~r In pr~r~
II of g:00 I.m,
06/03/90 (
TD: 0
PB: 5893
$UPV: ~
06/04/90 (
TD: 0
PB: 5893
$UPV:Hk~
06/05/90 (
TD: 0
PB: 5893
SUPV: HWP
06/06/90 (
TD: 0
PB: 5893
SUPV:HWP
· 06/07/90 (
TD: 0
PB: 5893
SUPV:RWO
06/08/90 (
TD: 0
PB: 5893
SUPV: RWO
17)
18)
19)
20)
21)
22)
AK
Well
RIH W/8.5" MILL 9-5/8"~ 5988' M~:11.1 NaCl/Bz
STING INTO k%'~,~.. ATTF.24PT TO INJECT W/O SUCCESS. RTNR VALVE
FAILED. POOH. MU 8-1/2" MILL AND RIH. MILL RTNR AND PUSH
TO 4461' MD. EST INJ RATE OF 3 BPM ~ 1350 PSI. POOH. MU
CMT RTNR AND RIH. SET RTNR @ 4395' MD. MIX AND PUMP 250 SX
(51 BBL) CL 'G' CMT. DISPL CMT W/10.6 PPG NACL. SQZ'D 44
BBLS CMT INTO PERFS. FINAL SQZ PRESS - 950 PSI. STING OUT
OF RTNR AND DUMP 3 BBLS CMT ON TOP OF RTNR. 'CBU, POOH. MU
8.5" MILL ARD RIH. ~
DAILY:S62,209 CUM:$1,515,000 ETD:S1,515,000 EFC:$1,650,000
DRLG CMT 9-5/8"@ 5988' MW:10.7 NaC1/Br
RIH W/MILL. DRLD CMT FROM 4385' TO TOP OF RTNR ~ 4395'.
DRLD RTNR AND CMT TO 4461' MD.
DAILY:S24,535 CUM:$1,539,535 ETD:S1,539,535 EFC:$1,650,000
CBU 9-5/8"@ 5988' MW:10.7 NaCl/Bz
TEST 9-5/8" CASING/SQUEEZE TO 1500 PSI F/30 MIN. LOST 500
PSI IN 30 MIN. MILL UP CMT RETAINERS. PUSH LOWER RETAINER
TO BOTTOM AND MILL ON SAME. CBU.
DAILY:S26,392 CUM:$1,565,927 ETD:S1,565,927 EFC:$1,650,000
POOH W/DP AFTER SET PKR 9-5/8"@ 5988' MW:10.7 NaC1/B=
CONT' CBU. POOH. PU 9-5/8" CSG SCRAPER AND RIH AND CLEAN
OUT TO 5890' MD. POOH. RIH W/9-5/8" PKR ON 3-1/2" DP. SET
PACKER. POOH.
DAILY:S121,374 CUM:$1,687,301 ETD:S1,687,301 EFC:$1,650,000
TEST 7" RAMS 9-5/8"~ 5988' MW:10.7 NaC1/B=
FINISH POOH. LEFT SF-.AL SUB ASS'Y OFF OF HST IN TOP OF
PACKER. FISH AND RETRIEVE SEAL SUB ASS'Y. RaH W/SEAL
ASS'Y. STING INTO PACKER AND VERIFY SEALS. OK. POOH LDDP.
PREPARE TO RUN 7" TUBING.
DAILY:S21,898 CUM:$1,709,199 ETD:S1,709,199 EFC:$1,650,000
POOH LD 7" TBG 9-5/8"@ 5988' MW:ll.1NaC1/Bz
FINISH TEST 7" RAMS. RaH W/7" COMPLETION ASS'Y. STING IN
AND VERIFY SEALS. UNSTING. DISPLACE TO INHIBITED
DIESEL/SEAWATER. PRESSURE UP TO TEST TUBING. PRESSURE
BLEEDING OFF. ROTATE SF2tL ASS'Y. PRESSURE UP AGAIn. STILL
BLEEDING OFF. POOH LD 7" COMPLETION ASS'Y.
DAILY:S100,827 CUM:$1,810,026 ETD:S1,810,026 EFC:$1,650,000
For form pr~plrltlOn Ind dlstrlbutl~
~ Pro~-edu~ Manual ~eGtlOn 10,
Drilling, Pigel 86 and 8?
]~%~~~ ]""' Drilling Supt,
AR3B-459-2-B
lNumblr iii doily w~ll hialoP/ Iotas conllcutlvlly JP~oe n~.
they Ire preplrld for elch will
ARCO Jnd Gas Company
Dally Well History--Interim
laelnK:li~lt: Thil torm I uled during drilling of wo~kover operetlonl.
Numar Ii dr Item tlltl ~quentillly. Attlch ~ripllon of III corel. WO~ ~rlo~d Dy YmOUClng ~cti~ wall ~ re.nco ~ "lnWr~ ~1 until ~11
completion· fllpod officill of repm~nlltivt tilt ~ "Flail" form. 1) Submit "lflter~ ' ~eetl l~n filled ~t but not Iiii frequently thin t~ ~ dlyl, o~ {~)
~ Wl~eldl~ of Ihl wllk i~ which oil II~i~g il NI. ~ll weekly for worko~rl in0 following ~ttlng of oll iI~lnG unlil compllli~,
Olltrtct
Field
),.,1~CO A~S]c~INC ]C°unty °r plrilh NORTH SZJO~)I~. 1StIll
PRUDHOE BAY IL""e °' U"it PWD#I-2 !w''' no
II of 8:00 I.m.
06/09/90 (
TD: 0
~'B: 5893
SUPV: RWO
23)
D~tlltng, Pagel ~6 Ind 67
RIH W/7" COMPLETION ASS'Y 9-5/8"e 5988' MII:11.1 NaC1/Br
FINISH LD 7" COMPLETION ASS'Y. PU AND RIH N/FULL SET OF
SEALS ON 3-1/2" DP. STING INTO PACKER. SEALS HOLD DOWN DP
AND ON BACKSIDE. POOH LDDP. MU FULL SEAL ASS'Y. RIH
W/SEAL ASS'Y AND 7" COMPLETION ASS'Y.
DAILY: $85,790 CUM: $1,895,816 ETD:SO EFC: $3,545,816
I~"' orilling SupL
AR3B-459-2-B
INumber III daily well hillory forml conlecutlvely IPage no.
II they Ire preperld for llCh Will,
ARC( il and Gas Company
Dally Well History-Final Report
IOllrl~llOfll: Preplre E lubmlt the "F~II R~" ~ fie fl~ We~e~ay ifltf IIIow~lt hll ~ ~d or wall II ~ugpd, Abln~d, or ~ld.
"FbAl R~* ~d ~ ~bmitlld lllo when O~rltiOnl em ~n~d for ~ in.finite or I~lKlt I~th ~ time. ~ wo~m ~ ~ ~cl~ ~ il ~
~qui~d u~n cWeti~, re~d completion Ifld mpreNntltt~ tell dill In btoc~ pmvi~d. The '?~ ~' fo~ rely ~ u~ for m~nlno ~ ~tim
O~rlli~ if iplCl il ivlillbll.
t Accountlng colt center
Diltrict ~RCO A~,,~II~ INC. lCounly or Plrilh NORTH S[,OPE slate
Field PR~HOE ~Y L... o, U,H ~L: 28326 I P~ffl-2
Aura. or W.O. ~'~3536 ~Tm. C~~
~: 50-029-22024
1 Fo.t numar of well. (.ctlve or in.clive) on ml~
o~retor ~O A.R.~. W.I. 22 · ~000 Ic~t c~nter prior to plugging ~
]lhndonmeflt of thl~ ~11
I 05/28/90 !' ~'30 H~ 1p~or 'tu' 'f ' w'O'
8~d~d or w.o.~pT~ O~e f
Dill end depth
II of 8:00 a.m.
06/10/90 (
TO: 0
Pa: 5893
SUTV: RWO
Complete record for each dly ri_oD.ed
2ES
24)
RIG RELEASED 9-5/8w0 5988' MN: :6.7 Diesel
CONT' RIH W/7" COMPLETION ASS'Y.~ LAND TUBING. TEST SAME.
OK. DISP WELLBOR~ W/DIESEL. RE-LAND. RILDS. ND/NU. TEST
TREE. OK. SET BPV. RELEASE RIG. **RIG RELEASED 6/9/90 AT
2000 HRS**
NOTE: CAMCO 'BAL-O' SSSV 0 2223', AVA 'PPB' PKR @ 3200',
& TT @ 3263'.
DAILY:S114,910 CUM:$2,010,726 ETD:S2,010,726 EFC:$1,650,000
Old TO ] New TO IPB Depth
Released rig I Data JKlnd ofrig
Cllor, ificltionl (oil. gal, arc.) I TyI~ completion (lingll, dull, arc.)
Producing mathe~ [ OfliCill m~ewOIr name(l)
PotentiAl tilt dill
WAll no. ~ Ral~wolr Produ~:lng IntervalOil or ~ll Teat time Prodootlon
,
Pump Alzl, ~OM X length Cl~kl AlZe T,P. C.P. Water % ~ I)revlt~ AIIowI~II -'ffeCtlvl ~
·
i
I
\
For fon~ p/~parlti~a Ind dlltflbutIMt,
lee Procedural Mamml, Section
DHIIIno, Plgel ~ end
AR3B-459-3-C
IN~lombor All dally will hlltory forml
they In prepared for els will. conlecUtlvlly
iPIoI nO.
TO:
THRU:
FROM:
MEMORANOUM
State of Alaska
ALASKA OIL A~ND GAS CONSERVATION COMMISSION
~' DATE:
Lonnie .C. Smi~/~~/ July 5, 1990
Commissxoner ~/ - o FILE NO:
3T. HH. 75.1
TELEPHONE NO:
SUBJECT:
Injection Well Problems
AAI PBU DW PW 1-2
Permit No. 90-33
Pruhdoe Oil Pool
Haroid R. HawKins
Petroleum Inspector,
Friday June 29, 1990: I called Lonnie Smith with AOGCC and he
ihfo~ed me ~hai~the injection well AAI PRU PW DW 1-2, had a problem
and to check it out. I did. The well is now disconnected from the
injection source and is shut down. Pressures on well are zero. I
checked the pad around the well. You could see where water had
flooded on the pad but no hydrocarbons were present on or in the
gravel. Production took over well after I witnessed and passed mech
integrity tests. Two were performed and passed. This was not where
the problem was. The problem seems to be a bad cement job on 9 5/8
casing. When injection was started, it came up around 9 5/8 and then
up around and away from the 13 3/8 and 20" and outside the cellar to
the surface. I was told by Steve Massey and James Fausett that this
was the drilling department's problem and should never have been
turned over to production to inject when they knew there was a
problem with the cement bonding to the 9 5/8 casing.
In summary, the problem was not the MIT tests, it was the long string
of 9 5/8 incorrectly cemented in the first place.
02-00lA (Rev. 6/89)
20/ll/MEMO1.PM3
STATE OF ALASKA
ALASF .)ILAND GAS CONSERVATION (' VlMISSION
APPLICATION FOR SUNDRY A PROVALS
1. Type of Request:
Abandon Suspend Operation shutdown Re-enter suspended well
Alter casing Repair well Plugging Time extension Stimulate
Change approved program Pull tubing Variance Perforate Other X
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK 99510-0360
5. Type of Well
Development
Exploratory
Stratigraphic
Service
4. Location of well at surface
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At top of productive interval
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At effective depth
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At total depth
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
6. Datum of elevation(DF or KB)
30 RKB
7. Unit or Property
Prudhoe Bay Unit
8. Well number
PWDW1-2
9. Permit number
90-33
10. APl number
50 - 029-22024
11. Field/Pool
Prudhoe Bay Oil Pool
feet
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 80'
Surface 3435'
Production 5958'
6005 feet Plugs(measured)
6005 feet
5900 feet
5900 feet Junk(measured)
Size Cemented Measured depth
20" 2850# Poleset 112'
13-3/8" 2000 sx CS III & 600 sx CI 'G' 3467'
Top job w/250 sx CS II
9-5/8" 300 sx CI 'G' 5988'
True vedicaldepth
112'
3467'
5988'
Perforation depth:
measured 4130-4220'; 4406-4430'
true vertical 4130-4220'; 4406-4430'
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 3195' MD
Packers and SSSV (type and measured depth) AVA permanent "PPB" packer @ 3200' MD; Camco Bal-0 SSSV @ 2223'
MD
13. Attachments
Description summary of proposal X. Detailed operations program BOP sketch X
14. Estimated date for commencing operation
July 1990
16. If proposal was verbally approved Oil
Name of approver Date approved Service
17. I hereby, certify that the fo~e and correct to the best of my knowledge.
Signed ' Title
15. Status of well classification as:
Gas Suspended
Disposal
Sr. Area Operations Engineer Date
FOR COMMI.~SION H~I= ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test Location clearance
Mechanical Integrity Test Subsequent form required 10- ~((2,~
I Approval No. ~ ~ '"~"'c~ D
Original Signed By
Approved by orderofthe Commissioner David W. Johnston
Form 10-403 Rev 06/15/88
418 MJB cc: J. Gruber, ATO-1478
PI(PWDW1-2)W1-3
Commissioner
Approvea L;opy
Returned
Date
I
SUBMIT IN TRIPLICATE
PWDW 1-2
Non Rig Workover Remedial Cement Job
Work Scope
Workovcr Objective : Repair cement channel.
1. Make a sliekline tag to verify PBTD.
2. Perform a coiled tubing unit cement squeeze with 150 bbls of cement to isolate the
perforations from 4130'-4450'.
3. Jet out the contaminated cement.
4. Log with gamma ray to determine top of cement.
5. Underream cement across perforations.
6. Reperforate as follows:
Zone Interval
T3 4130'-4220'
T3 4406'-4430'
7. Bring well on injection.
Other Well Information
Current status: Shut in.
Expected static bottomhole pressure: 1827 psi. @ 4100' SS
Expected fluid in wellbore at reperforation: seawater.
5
4
3
2
COILED TUBING UNIT
BOP E~U 1 PI,~ENT
1. ~000 PSI ?" WELLHEAD CONNECTOR FLANGE
2. 5000 PSI 4 1/16" PiPE RA~S
3. 5000 PSI 4 1/6" HYDRAULIC SLIPS
4. 5000 PSI 4 1/6" SHEAR RAMS
5. ~XX) PSI 4 1/6" BLIND RAMS
6. 5000 PSI 4 1/16" STUFFING BOX
NiRELINE BOP EOUIPMENT
1. 5000 PSI 7" WELLHEAD CONN£CIOR FLANGE
2. 5000 PSI WIRELINE RAMS (VARIABLE SIZE)
3. 5000 PSI 4 1/6" LUBRICATOR
4. 5000 PSI 4 1/6" FLOW TUBE PACK-Orr
ARCO ALA,.?KA, IN
F'.~O~ BOX ~ 6,6,360
A N C: H 0 R A G E, A L A S' K A
D A T E · 6 / t 9 / 9 '.'3
R Iii: F' E t::.: E N C E ' A R C 0 C; A ;i:; E D H 0 I... IE F:' I N A I...
I::~ W D W i .... 2. 6 .... i (!) .... 9,.':i) C f.') L. L A 1:~,'
l::'WOt,,ti .... -2. 6 .... i ri_on,, , ..,C-'./F;:
-") .... -') -'~ c:.' .... ...
..... · ..: .., .... :'!':; i .... 9 (-) ~ fi!: i"i i::' E F;.'. A'T'I IR Iii: ,~' L.I R V Iii: Y
'? .... 2'2 6 .... 9 '"' 9 6' D 1...t A t... B t..j F;..' ;!i; i" 'f' D 'i" '"' F' & F:'
7"" ¥ 4 6 .... 9 .... 9':3 D ]: F' F:' ,, 'i"IE H P E F;.'. A 'f'U F;.:lii:
i'i .... 22 6 .... 'i'i .... 9 6' PF:'C
'i 2 .... ':?. ii') ,ii, ..... i 'i .... 9 (') C 0 H t::'tii, iq ;i,;' A 'i" Iii. D N Iii: U 'i" F;..' 0 N 61. / R
F:' l... iii: A ;.:'.:; Iii: ;!;' ]: (]. N A N D R lii:'f' t.J R N '¥' l"t E A f' i' A C H E D
HAVE A N]:C.:E DAY! RE(~E~vE
J UN ~: 0
Alaska. Oit .& Gas Cons. Bom~lss~'O'll
'Nichorag~l -'"
C 0 P Y A ?..' I:;: i:i: C Iii: :i: I::' T' 0 I::'
A F:' F:' R 0 V Iii: D _~... !.......
'T' F;,' A N ~: :.": 9 '3 '2 '2 '5
):) A 'f' A,.
D I ,::.'; 'f' t:;.' I B U "[' ]: 0 N
D A T Iii ' 6 / 7 / 9 ()
R E F:' !ii; F;.: E N C E ' A R C 0 C A,.? E D H C)L.. E F:' I N A L..
F' W D W i .... '~:, ,::.: -. '::,,::;, .... (:~ n ,'.?Q ~ lei: tE Z E F:' E R F' R I IN i '=."
~, .... ; :~. ; : ..,, , .., ! .,.-'
!::'U D W i - 2 5-2 9- 9 (') B R ]: g (; Ii"' F:' L I.J G ;!~,' li.]"l"'r :[ N 6 R E C R U N i., '5"
i .... f i 6 .... 2 .... 9,:::, ('; 0 M P N f.'i: U T R 0 N G ." R RIIiN.! i 1::' II
..... .~ ...:'
i .... '"' ;:", 6 "~ 2 '- 9,:') C. r') M F' N. IE U T F;.: 0 N (; / 1.;: F;: I..j i'-.~
,-;. ;; .o .~ ...;'
i .... 29 6-S .... ?6, COMP NELI'f'F('ON G/R I:~:L.IN i.,
3'"' 2'? 5 .... 24-9 (.) C 0 M P N E U"f' R 0 N R U N i , 5"
4 .... '~ "~; ':"" N J . 2"
...... ,. tc~ 9<i) ""~ ....
.... , -" F U,.', I I TIE M r-' R U N i ,
6'-',.~ 'J.~--2'.~ .... 9,:"2 Ct]MI-" NIEUTI:;.'.ON RIJN tp, '.:.~"
'/ .... i 6 '::.'..,. .... ,_':) 4 -- o (); CriMP ........ NE-'.U'FRON R'[!N ,-~', ~:.'~..
t 2 .... i 8 5 .... 30.-.-?,:.) J ......
...UI_L.~.~I~ RUN i
i ii!..-i 7 .5 .... 2 L~-.9,3 C.'F)MP NELtTRON RLIN i '-'".'"
.... ~ ..,.'
"-" '" '-':' 9";) C f') M P N 1..- U"f' J:;,' [) N R U N
i 8..- t 9 .> .--~.:.,:~ .... .. ,: . ..
F:' I... E A i: E ~: I (.'; N A N D i:('. E T U R N T H E A'f' T A C H E I) C 0 P Y A ;'~' R E C E I P T 0 F I) A 'f' A,
· .,'-,.- ,. lv
I~I.-...EI rED BY ....................
HAV i: A )AY! JUN 1 4 1990
:!;' At...L. ¥ HOF'F'E CK ER Alaska Oil & Gas Cons. commlssloti
A'r 0 .... ! 2 <? Anchorage
APF'ROVE )~~
I'F;,'AN~'~ 9(')2 t S
D I ~,' l' R I B U T ]] 0 N
..~ CENTRAL FILES
Ji.
~,. CHEVRON
... EXTENSION EXPLORATION
EXXON
MARATHON
· ~" MOBIL
'"- F'H ILL I F',S'
-ir
PB WE'Ll_ F:'IL..ES'
R & D
~ BPX
,.'9'f'A'f'E OF AL.A~'KA
TEXACO
ARCO ALASKA~ INC~
P~O~ BOX ~0~S6~
ANCHORAC;E, AL. ASI<A
995 ~ ~
DATE' 5-2--90
REFERENCE'
ARCO CASED HOLE F'INAI...S
.l'", 0 F' R C) D LJ C l' I 0 N
i'-'? 4-'i F ~',~
i'-t0 4-t 8-90 F'ERF RIECORD
4""i 5: 4-'2.5 .... 90 C.)I...I..AR, F E.I',~I"
'7'- t 0 4 "- t 9- 9 G V E R'F I L. C) (;
"? .... t 0 4-2t -90 F:'F~'.C)DLJCTIC)N F:'KR
7"'i 0 q'-2i '"'~G F'FC
7-23 4-20-90 CCIMF'L. EI'ION RECC)RD
~'-26 t-2t-90 COI..LAR '['C) SET PATCH
1 5- t t t -" t -90 F:'ERF:'
t '?-~ 4-20'-~G CCI_
t 7-t ~ t --t 4'"9G COLL. AR TO ,S'EI' F:'I...LIG
F'HDWt -2 4-22-90 CBT
F'HDWt '-2 ~-22'"?~ CIET
WGI-8 4-22-9~
WGI--8 4-..22-'9e CBT
WG ~ -8 4.- 22-'-9 e CET
RUN t ,...:.~':'"
RUN
Fi'.Ui,.I t , 5"
RUN t, 5 '
RUN t, 5"
R U i',!
RLJN t, 5:"
R U N
R U N
RUN
RLJN t, 5"
RUN ~ , 5 '
R LJ N
R U N
R U N
RUN
F'LEASE SIGN AND REI'URN TFIE ATTACHEI) CC)PY AS F(EC;FIF:'I' C)F DATA.
SCH
A'T' L. A ,S'
A'i' I.. A,S'
A 'i' I.~ A,., ~''
A "i' L A,S'
,'!;' C I..I
HI... ;:.';
I..1 I...,S'
I..IL.,S'
SCH
,S'CH
SCI.]
S C H
RECEIVED BY
A'FO-t 5~9
Naska 011 & Gas Cons. Commission
chorage
DISTRIBUTION
..-'"- CENTRAL FII_ES ,.'"'PHILLIPS
~'~-CHEVRC)N F'B WELL F:'ILES
D & M R & D
· -~"EXTENSION EXPLORAI'ION ...'"' BPX
· ,~ EXXON .,'~ STAI'E OF ALASI<A
MARAI'HON I'EXACO
· ~ MOBIL
* I'HE AF'I~: F:'OR t.5-i i I$ 50-'029-'206':~3,
D A 'T' !ii: · 4 - '2 4 .-. ? 0
RtE F:' E R E N C E · A R C: 0 D I R E C: T I 0 N A t... D A'I" A
W 61 .... 8 4 - ~'.; - 9 (')
M W D D I R Ii:.' C'T' t 0 N A I .... ? !.J R V E Y
M W D D I R Ii.=. C 'r ! 0 N A I... ,'...; I.j R V Ii-" Y
J 0 B :,~: 7 ]:: t
P I... Iii:" ~'' , .....................
~.l,.:. E 9 ! .G N A N D t:(' E'.'."l" U R N T H F.!: A T T A C I"t Iii: D r'. f't P v' A,? R I::' f': E:' I P 'T' f'i F' .1:.) A T A,.
R E C'. Ii!: I V E D B Y ........... . .,,X'E..~..~...._... .....
t..IA V E A N I C r_...". D A Y !
;:"," A t... L. Y I"10 F:' F:' E: C: I( E] R
A T 0 .... i ~ 2 9
D 12 T R I B U'I' I 0 N
CENTRAl_ F I I... IE,~.¢
C 1..! E V R 0 N
· ,.'"' E X 'T' E'. N.,S' I 0 N E: X F:' L.. 0 R A "f' :t: O. N
· .. IE X X 0 N
MARATHON
MOBIl...
F'I-.! ;[ L.. L. I F',.9
~: P B WEI...I... FILE2 (2 COF'IE. 2)
R & D
'"' B P X
'il"
· ,~ 2TA'/E 01:: AL. A2KA
'f' E X A C 0
ARCO ALA~'KA~ INC·
P ~ 0 · BOX
ANCHORAGE ~ ALASKA
99~0
DATE~ 4-~ 2-9~
F;~I~i:F:'ERE. NC;E' ARCO CA,S'E:'D HOL. E F:'INAL.$;
~ -'L"> S--3 ~ -..o0 F:'E:RF:' kECORD
2-9 ~-22-89 F'ERF RECORD
S .... S S'"':JO""9.0 PERF DEPTFI RE:CORD
S-23 4-~-90 F'ERF RECORD
S""24 4-4-90 PERF F~'.EC ORD
4'-5 ~'-~2-'89 PERF RECORD
7""2 ~ 4 0-'30""89 TEEMF:'
9-29 4-7-90 COLLAR/F'ERF
~2-~0 ~i-~7-89 PERF RECORD
PWDWi -2 4-7-90 CBT
PWDWi-2 4-7-90 CEI'
WGI-6 3-2'7-90 CBT
W (; I - 6 3 - 2 '7 - 9 (.) C E T
PI_EASE SIGN AND RETURN THE ATTACHED COPY
R E C E: I V E I) B Y _ .~..: ............................................
HAVE A NICE DAY, RECEIVED
,S'ALI..Y FIE)FFE~CKE~R
ATO.-t 529
APR 1 8 1990
AI.km 011 & Gms Cons. Commis~lon
Anchorage
DISTRIBUTION
CENTRAL FILES
.CHEVRON D&M
EXTENSION EXPLORATION
EXXON
MARATHON
MOBIL
RUN
RUN
RUN
RUN
RUN
RUN
RLJN
RUN
RLJN
RUN
RLJN
RUN
RLJN
i .i
i,
i,
i,
i,
i,
i,
i,
i,
AS RECEIPT OF' DATA,
· ,,.'"' F'H ILL I F'..S"
PB WELL. F'ILES
R & D
~ BPX
· ~ STATE OF' ALASKA
TEXACO
5"
5"
5 '
5"
5 '
5'
5"
5'
5"
5'
2'&5'
5'
~'CI"I
HL~,~
.? C H
$ C I"1
,S'CFI
I"!1...,~
I"IL,S'
A'FI_A;~"
I'-IL.,.$'
SCH
,.~Cf'l
SC.'FI
STATE Of ALASKA
AI_~oKA OIL AND GAS CONSERVATION COMMISSION 0
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon _ Suspend _
Alter casing _ Repair well
Change approved program _
Operation Shutdown ~ Re-enter suspended well _
_ Plugging _ Time extension _ Stimulate _
Pull tubing_ Variance _ Perforate _ Other
2. Name of Operator
ARCO Alaska. Inc.
3. Address
P. O. Box 100360, Anchorage, AK 99510
4. Location of well at surface
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At top of productive interval
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At effective depth
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
.. At total depth
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
RKB 30'
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
PWDW1
9. Permit number
90-3,~
10. APl number
50-029-220;~4
11. Field/Pool
Cretaceous/Undefined
12. Present well condition summary
Total Depth: measured
true vertical
6005' feet
6005' feet
Plugs (measured) None
Effective depth: measured
true vertical
5900' feet
5900' feet
Junk (measured) None
Casing Length Size
Structural
Conductor 8 0' 2 0"
Surface 3435' 1 3-3/8"
Production 59 58'
Liner
Perforation depth: measured
9-5/8"
None
true vertical None
Tubing (size, grade, and measured depth
None
Packers and SSSV (type and measured depth)
None
Cemented
Measured depth True vertical depth
2850# Poleset 1 12'
2000 sx CS III & 3467'
600 sx Class G - Top job w/250 sx CS II
300 sx Class G 5 988'
112'
3467'
5988'
APR 1 8
.8iJ.& ~as Cons. Commissior~
~ Anchorat~
13. Attachments Description summary of proposal _
Well Histo
14. Estimated date for commencing operation
May 7. 1990
16. If proposal was verbally approved
17.
15.
Detailed operation program_
Status of well classification as:
Oil Gas
BOP sketch
Suspended
Name of approver Date approved
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Service Produced Water
ned
Title Drilling Analyst
FOR COMMISSION USE ONLY
Date
Conditions of approval: Notify Commission so representative may witness
Plug integrity_ BOP Test_ Location clearance__
Mechanical Integrity Test_ Subsequent form require
IlAppr°val No.~'~ ~
the order of the Commission
Form 10-403 Rev 06/15/88
ORIGINAL SIGNED BY
I,~NNIE C. SMITH
Commissioner
SUBMIT IN TRIPLICATE
Approved COpy
Retur:~ed
.A.
ARCO, and Gas Company
Well History - Initial Report - Daily
Instructions: Prepare and submit the "l.ltill Rol~rt" on the first Wednesday after a well is spudded or workover operations are started.
Daily work prior to spudding sho~lld be summarized on the form giving inclusive dates only,
District ARCO A.~II~S~[zl~ TNC. ICounty, parish or borough
I
Field PRUDHO~- BaY JLease or Unit
I
Auth. or W.O, no. AS3536 ITM
I
Operator ARCO
Spudded or W.O. begun SPUD IDate
Date and depth
as of 8:00 a.m.
03/1.(
TD:
SUPV
03/2(
TD: i
S UPV:
03/2;
TD: ~
SUPV:
03/2;
TD: ~
SUPV:
03/2~
TD: ~
SUPV:
03126
TD: 6
SUPV:
NORTH SLOPE
ADL: 28326
ISlate
IWell
AK
no, PWDW1-2
DRILL
API: 50-029-22024
Complete record for each day r~RS 28E
J ARCO W.I.
03/1~0 23: l~ri°r status if a w'°'
21.7
/90 ( 1)
514'( 514)
MRC
/90 (2)
645' (1131)
MRC
/90 (3)
077' (1432)
MRC
/90 (4)
500' ( 423)
MRC
/90 ( 5)
500' ( 0)
.
599':(99)
MRC
90 (7)
52' (1653)
YtRC
/90 ( 8)
005' ( 753)
MRC
DRILLING AT 514' 20"@ 112' MW: 8.8 VIS:300
ACCEPT RIG @ 1600 HRS, 3/18/90. NU DIVERTER AND MIXED SPUD MUD
P/U BHA. SPUDDED AT 2300 HRS 3/_~18/9. Q. DRILLED F/122-514'.
DAILY:S33,459 CUM:$33,459 ETD:S33,459 EFC:$1,650,000
DRILLING AT 1645' MW: 9.1 VIS:280
DRILLED TO 634'. CHANGED SWIVEL PACKING. DRILLED TO 1645'
DAILY:S120,278 CUM:$153,737 ETD:S153,737 EFC:$1,650,000
TRIP FOR BIT #2 MW: 9.2 VIS:192
DRILLED TO 3077'. CBU. TRIP FOR BIT.
DAILY:S42,406 CUM:$196,143 ETD:S196,143 EFC:$1,650,000
PERFORMING TOP JOB 13-3/8"@ 3467' MW: 9.3 VIS:172
WIH W/ BIT #2. DRILLED TO 3500'. ST CBU. POH. RAN 3500'
13-3/8" 68# L-80 BTC CSG. CIRC. CMT'D W/ 2000 SX CSIII AND
600 SX CL G. CIP AT 0500 HRS 3/22/90. PERFORMING TOP JOB.
DAILY:S306,500 CUM:$502,643 ETD:S502,643 EFC:$1,650,000
CHANGING OUT BOP 13-3/8"@ 3467' MW: 9.3 ViS: 40
PUMPED 250 SX CS II TOP JOB. CUT OFF CSG. WELD ON STARTERHEAD.
NU BOPE. TOP RAMS LEAKING. CHANGED SEALS-STILL LEAKING.
CHANGING OUT TOP RAM BODY.
DAILY:S163,252 CUM:$665,895 ETD:S665,895 EFC:$1,650,000
DRILLING AT 3599' 13-3/8"@ 3467' MW: 9.3 VIS: 40
ND FLOWLINE. NU BOPE. TEST SAME TO 5000 AND 3000 PSI. BU
BIT # 3 AND RIH. TAG CMT AT 3376'. TEST CSG TO 2500 PSI.
OK. DRLD CMT, FC AND CMT TO 3455'. TEST CSG TO 2500 PSI.
OK. CMT FS AND 10' NEW HOLE TO 3510' LOT TO 15.1 PPG EMW.
DRLD F/ 3510' TO 3599'.
DAILY:S61,748 CUM:$727,643 ETD:S727,643 EFC:$1,650,000
DRILLING AT 5252' 13-3/8"@ 3467' MW:ll.0 VIS: 39
DRLD F/ 3599' TO 5252'
DAILY:S86,739 CUM:$814,382 ETD:S814,382 EFC:$1,650,000
POOH 13-3/8"@ 3467' MW:ll.0 VIS: 44
DRLD TO 6005'. TRIP FOR BIT. TIGHT AND SWABBING. RUN BACK
IN HOLE. CIRC 4 PPB NUT PLUG SWEEP. POOH.
DAILY:S57,688 CUM:$872,070 ETD:S872,070 EFC:$1,650,000
The above is correct ' t
Signat~.~~
For form p?eparation and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
AR3B-459-1-D
INumber all daily well history forms consecutively
ss they are prepared for each well.
iPage no.
ARCO O, .... td Gas Company ~,
Daily Well History--Interim
Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed.
Number alt drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets unlil final
completion. Report official or representative test on "Finel" form. 1) Submit "lnt®,im" sheets when filled out but not less frequently than every 30 days, or (2)
on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil strin[} until completion.
District ARCO ALASKA INC. County or Parish NORTH SLOPE IState AK
I
Field PRUDHOE BAY Lease or Unit PWDW1-2
Date and depttl Complete record for each day while dr~l~rko~'J~n progress
as of 8:00 a.m.
03j
TD:
SU~
03,
TD
SU!
27/90 ( 9)
6005' ( 0)
V:DAC/TJ
8/9O (10)
6005'( 0)
V:DAC/TJ
RIH W/9-5/8" CSG 9-5/8"@ 5988' MW:ll.2 VIS: 44
POH, PUMP OUT OF HOLE 4402-3700', POH TO SHOE, RIH, CBU,
POH, STABS BALLED UP, R/U SCHLUMBERGER, RUN GR/CALIPER 5991'
ELM, M/U BIT AND RIH, 10' FILL, WASH TO 6005', CIRC HI-VIS ,
SWEEP AROUND, POH L/D BHA, PULL WEAR RING, CHANGE TOP RAMS
TO 9-5/8, TEST DOORS TO 3000, R/U RIH W/ 9-5/8" CSG.
DAILY:S203,856 CUM:$1,075,926 ETD:S872,070 EFC:$1,853,856
POOH 9-5/8"@ 5988' MW:ll.3 VIS: 46
RIH W/9-5/8 CSG TO 5988, LYNES ECP AT 4982, HOWCO HOSS STAGE
COLLAR AT 4919, LANDED CIW GEN IV HANGER, CIRC MUD, PUMPED
SPACER, PUMPED CMT (300 SX CLASS G), DISPLACED CMT AND BUMPED
PLUG, ATTEMPTED
TO SET LYNES ECT AND OPEN HOWCO HOSS STAGE COLLAR AND SAW NO
INDICATION OF EITHER TOOL WORKING, INCREASED PRESSURE AND
DROPPED A HOWCO BOMB AND TOOL DID NOT SHIFT OPEN, BLED OFF
PRESSURE, L/D LAN-DING JT, N/D DRILLING SPOOL, TESTED SEALS,
N/U BOP AND PRESSURE TESTED, P/U MULESHOE AND RIH, CBU,
SLACKED OFF ON STAGE TOOL AND SHEAR PINS BROKE, ATTEMPTED
TO CIRCULATE DOWN DRILL PIPE AND UP CSG ANNULUS, NO SIGNS OF
CIRCULATION, CIRC., POOH TO PICK UP 8-1/2" MILL.
DAILY:S92,993 CUM:$1,168,919 ETD:S1,100,000 EFC:$1,718,919
The above ia correct ~.
For form prepa~l'ation and distribution
see Procedures Manual Section 10,
Drilling, Pages 86 and 87
Oate,~ ~ ITitle
Drilling Supt.
AR3B-459~2-B
Number ail daily well history forms consecutively
as hey are prepared for each well.
IPage no.
ARCC .~il and Gas Company
Daily Well History-Final Report
Instructions: Prepare and aubmit, th~ '~F~.i~l~. ~[,t" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned or Sold.
"Final Report" should be s~bm!tt~.:~al~.~l~ll. ~raflon~,~are Suspended for an indefinite or appreciable length of time. On workovers when an official test is not
required upon completion, repOrt c~l~l~!~:~J~fN'eaentatlve test data in blocks provided, The "Final Report" form may be used for reporting the entire
operation if space is available~::-::.~:..:~;. ?~:
Accounting cost center code
District
ARCO A~SKA INC.
PRUDHOE BAY
Field
ICounty or Parish NORTH SLOPE
Lease or Unit ADL: 28326
Title DRILL
State
AK
no. PWDWi-~
Auth. or W.O. no,
AS3536
Operator
Spudded or W.O. begun
Date and depth
as of 8:00 a.m.
~CO
w.I.
I A.R.Co.
SPUD IDate
!Complete record f ..... h day re]~Lr~r~)RS ~8E
API: 50-029-22024
0)
2, ~'p,t,a,l~,nurnber of wells (active or inactive) on thisI · ~ · l~c'~l~l~enter prior to plugging and
labandonrnent of this well
J
03/~"~u/9 0 23 :l~r6or ,,a,us ,, a w.o.
PREPARING FOR RIG MOVE 9-5/8"@ 5988' MW:ll.1 VIS: 0
P/U MILL, CUT DRILL LINE, RIH WITH MILL TO STAGE DOOR, CLOSE
STAGE DOOR, TEST CSG, DRILL HOSS STAGE COLLAR, RIH AND TAG
HOWCO BAFFLE COLLAR @ 5892', CBU, REVERSE CIRCULATE, TEST
9-5/8" CSG, POOH L/D DRILL PIPE, N/D FLOWLINE/HYDRILL/ BOP,
INSTALL DUMMY HANGER AND TEST PLUGS-TEST PLUG WILL NOT SEAT
PROPERLY, N/U XMAS TREE AND TEST TO 3000#, INSTALL BACK
PRESSURE VALVE AND FREEZE PROTECT 13-3/8 X 9-5/8" ANNULUS
W/ 185 BBLS 50/50 DIESEL/CRUDE MIX. RR @ 0400 HRS, 3/29/90.
DAILY:S34,484 CUM:$1,203,403 ETD:S1,100,000 EFC:$1,718,919
03/~9/90 (11)
TD: 6005' (
SUP%~: MRC
, ..
OIdTD I! New TO J I ps Depth
Released rig Date JKind of rig
Classifications (oil, gas, etc.) J Type completion (single, dual, etc,)
Producing method J Official reservoir name(s)
Potential test data
Well no. Date Reservoir Producing Interval Oil or gasTest time Production
Oil on test Gas per day
Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date
corrected
For form prep~a'~ation an; distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
AR3B-459-3-C
INumber all daily well history forms consecutively
es they ere prepared for each well.
Page no.
DIvlM~ of AllantlcRIcMletdCompa~y
A I::~ C' O ALAS'KA
F'. 0 · BOX i
ANCHORAE;F, ALASKA
995 ~ ¢~
DATE: 4-4-90
REFERENCE: ARCO OPEN HOLE FINALS
.,--,..~ t(l/")S-;5t/89.,_ EWR/DGR RUNS t-ti, ~.')"&S'I'VD
5-'.~7 i~/2~-Si/89 DGR/CNF'/,SI~"D R~N,~ i'-it 2 &5 '¥VD
WGZ-6 S/ie-i4/9~ GR RESISTIVITY RLIN ':.). , ,..'~'TVD
W(.;I-6 3/i~,")-t4/9~ GR RES'ZSTIVITY RUN '?, 2'
F'WDWt.-"'2 S--':26-9¢ CALIPER-GF~ RUN i , 2'
F'WDWt-2 S--26-9¢ CAI_IPER-GR RUN i, 5"
PI_EASE SIGN AND RETURN TFIE ATTACHEI) COPY AS RECEIF'T OF DATA,
HAVE A NICE DAY!
APR - 6 1990
SALLY HOFFECKER . · F'F'ROVED ,,.,'//r--
A'l' O- t 5 2 9 Aiaska Oil & Gas Cons. CommtsstO- R A N S' :~ ? 0 T ~ ~-'
AnchOrage
Nt_ S F' li--
NL. SF'E
AMA
AMA
,.'.. U I"1
~ C I"t
DISTRIBUTION
· ,-'" CENTRAL FILES ,-~ PHILLIPS
~ CHEVRON PB WELL FILES
~- D & M ~- ~ R & D
~ EXTENSION EXF'LORATION ~ ~ BF'X
' EXXON '" STATE OF ALASKA
81'
'*~ MARATHON ~" TEXACO
' MOBIL
OIL AND GAS CONSERVATION COM 31ON ~ ~
APPL,,-,ATION FOR SUNDRY APPROVAL'S'
1. Type of Request: Abandon
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. O. Box 100360, Anchorage, AK
_ Suspend _ Operation Shutdown _ Re-enter suspended well _
Alter casing ~ Repair well _ Plugging _ Time extension _ Stimulate _
Change approved program _ Pull tubing ~ Variance _ Perforate _ Other
6. Datum elevation (DF or KB)
99510
4. Location of well at surface
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At top of productive interval
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At effective depth
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
At total depth
762' FSL, 252' FWL, Sec. 31, T11N, R15E, UM
5. Type of Well:
Development _
Exploratory _
Stratigraphic _
Service _X
RKB 3O'
feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
PWDW1-2
9. Permit number
90-33
10. APl number
50-029-22024
11. Field/Pool
C retaceo us/U ndefi ned
12.
Present well condition summary
Total Depth: measured
true vertical
feet Plugs (measured)
feet
Effective depth: measured
true vertical
feet Junk (measured)
feet
Casing Length
Structural
Conductor
Surface 3468'
Intermediate
Production
Liner
Perforation depth: measured
Size
13-3/8"
true vertical
Tubing (size, grade, and measured depth
Packers and SSSV (type and measured depth)
Cemented
Measured depth True vertical depth
3500' 3500'
A change in the 13-3/8" surface casing depth from
3000' MD/TVD to 3500' MD/TVD is requested. This
change will improve the fracture gradient atj~E C E
13-3/8" casing shoe.
13. Attachments
Description summary of proposal _
Detailed operation program_
BOP
14. Estimated date for commencing operation
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil __ Gas _ Suspended
Service Produced Water Injector
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~]rf~ [~,Onu/}'~J ~ J, i,'%"~./ Title Drillin~ Analyst
/) FOR ~MMISSION USE ONLY
Date
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~ Location clearance~
Mechanical Integrity Test__ Subsequent form require
Approved by the order of the Commission
ORIGINAL SIGNED BY
LONNIE 6. SMITH
10-,4,~ 7
Commissioner
IApproval No~,~
I
DJ)
Form 10-403 Rev 06/15/88
Approved Copy
Returned
. . __
SUBMIT IN TRIPLICATE
March 13, 1990
Telecopy No.
(907) 276-7542
J D Giliespie
Regional Drilling Engr
ARCO Alaska, Inc
? 0 Box 100360
Anchorage, AK 99510-0360
Re: PrudhOe Bay Unit PWDW 1-2
ARCO Alaska, Inc
Permit # 90-33
Surf Loc 762'FSL, 252'FWL, Sec 31, T/iN, R15E, UM
Btmhole Loc 762'FSL, 252'FWL, Sec 31, TllN, R15E, UM
Dear Mr Giliespie:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and
does not authorize conducting drilling operations until all other
required permitting determinations are made.
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so that a representative o~ the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. Where a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
V~y~ trul.~ yo3~-~s, ..... ~ .~
." ? ..... /." / ../... .~ ~:
Chai~an
Alaska Oil and Gas Conservation Co~isslon
BY O~ER OF THE COMMISSION
jo
Enclosure
Department of Fish & Game, Habitat Section - w/o encl
Department of Environmental Conservation - w/o encl
--,, STATE OF ALASKA ~
ALASKA L AND GAS CONSERVATION Ct ,MISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill ~' Redrill 5[ lb. Type of well. Exploratory ~ Stratigraphic Test ~ Development Oil
Re-Entry - Deepen'~1 Service i~' Developement Gas L--_ Single Zone ~ Multiple Zone
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P.O. Box 100360, Anchorage, AK
99510-0360
4. Location of well at surface
762'FSL, 252'FWL, Sec.31, TllN, R15E, UM
At top of productive interval
762'FSL, 252'FWL, Sec.31, TllN, R15E, UM
At total depth
762'FSL, 252'FWL, Sec.31, TllN, R15E, UM
12. Distance to nearest ~ 13. Distance to nearest well
property line j PWDW 1- 1
252 ' feet 12 ~ O ' feet
16. To be completed for deviated wells 3/4 o
Kickoff depthN/A feet Maximum hole angle 0
18. Casing program
size
Weight
, 94.5#
68#
47#
Specifications
Grade ! Coupling i Length
iH-40 I Weld J 80'
,
Hole Casing
20"
17-1/2" 13-3/8"
12-1/4" 9-5/8"
5. Datum Elevation (DF or KB)
30 ' RKB feet
6. Property Designation
ADL ~ '.~',g'~_, ~'
7. Unit or property Name
Prudhoe Bay Unit
8. Wellnumber
PWDW 1-2
9. Approximate spud date
03/13/90
14. Number of acres in property
10. Field and Pool
Cretaceous Pool
Undefined
11. Type Bond Isee 2o AAC 25.025)
Statewide
Number
No. U-630610
Amount
$200,000
2490
17. Anticipated pressure (see 20 AAC
Maximum surface 2 2 8 0 psig At total
19. To be completed for Redrill, Re-entry, and Deepen O
Present well condition summary
Total depth: measured feet
ti'ue vertical feet
Setting Depth
Top Bottom
MD ! TVD I MD ] TVD
30' 130' I 110' I 110'
30, 130, 13000,1
)orations.
Plugs (measured)
15. Proposed depth (bid and TVD)
, 6600'TVD/MD ,,, feet
25.035
depth O'VD) 2 9 4 0 i psig
Quantity of cement
(include stage data)
2000# Poleset
3000' 1800 sx AS III,600 sx
6600' 2200 sx AS III,1000 sx
Effective depth: measured feet
true vertical feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size
measured
true vertical
Junk (measured)
Cemented Measured depth True Vertical depth
RECEIVED
MAR -'1 1990
Alaska 011 & Ga~ ~.~. GommigSlO~
Anchora§m
L G
G
20. Attachments Filing/fee ~ Property plat [] BOP Sketch ~,- Diverter Sketch-~' Drilling program ~
Drilling fluid program ~Time vs depth plot [] Refraction analysis [] Seabed report ~ 20 AAC 25.050 requirements
21. ! hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Title
~'~'~"=_! Drilling Eng!ncer
Commission Us~ O~n~¢-- (JPS) PD 3 / ] 07 ~ ~i/*
[ O3/J. 3/90 Isee ~'°ver letter
Permit Number APl number Appro.val date_
~/,-~ -.- .~._ ~' 50-- O~--. ~ "' 'Z-- ~.0 ~.. ~/ for other requirements
Cond,¢tio'-'~s of approval Samples required ~ Yes ~No Mud Icg required L-] .Yes. ~ No
Hydrogen sulfide.measures iq Yes ,.~No Dir. ectional survey required [] Yes~N
o
Required working~r.~ssur¢'jorB.,OPE') E~2M; .~NI; E35M; [] 10M; [] 15M
Other: //~ //~~
by order of
Approved byL_~.,.,~. ~..,.~~~ Commissioner the commission
Form 10-401 Rev. 12-1-85
Date 3-./-_~¢_9-
OPERATIONS SUMMARY
1. MIRU ddlling rig. NU diverter and function test same.
2. Spud well and drill 17-1/2" hole to" 3000' TVD /MD.
3. Set 13-3/8" casing and cement same. Nipple up BOPE and test to 5000 psi. Test casing to 2500 psi
for 30 minutes.
4. Pick up 12-1/4" BHA and GIH. Drill 10 ft of new hole and perform leakoff test.
5. Ddll a straight 12-1/4" hole to 6600' TVD/MD.
6. Run wireline logs as programmed.
7. Run 9-5/8" casing and displace cement with brine.
8. Test casing to 3000 psi for 30 minutes.
9. Release drilling rig. Run cased hole logs 7 days after rig release.
10. MI and RU completion rig. Run 7" tubing and packer assembly. Test tubing casing annulus to 3000
psi for 30minutes. Notify the AOGCC so a representative can witness the casing integrity test.
11. N/U 7" tree and test to 3000 psi. Release completion rig.
12. Rig up wireline unit and perforate.
NOTE;
a. The 13-3/8" x 9-5/8" annulus will be left with a non-freezing fluid during any extended period. The annulus
will be sealed with 300 sx of cement followed by Artic Pack.
b. No existing wells are within 200 ft. of the proposed well.
c. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.033.
d. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/fi).
e. Based on the logs from PWDW 1-1, no potential productive zones are anticipated above 3000' TVD.
f. No potential hazardous levels of H2S are anticipated in this well.
RECEIVED
MAR - 1 1990
Alaska Oil l Gas Cons. Commtsst~
Anchorage
PWDW 1-2
MUD PROGRAM
DEPTH DENSITY VIS YP INT 10MIN FL OIL SOLIDS MUD
(TVD) (PPG) GELS GELS CC/30MIN (%) (%) TYPE
SPUD 8.8 300 70 30+ 50+ 25 0 2 GEL-BENEX
to to to to to SPUD MUD
13-3/8 9.2 100 40 6
csg pt.
SET 13-3/8" CASING
DEPTH DEN- PV YP INT 10 min FL OIL SOLIDS MUD
SITY
(TVD) (PPG) (CP) (#/ft GEL GEL cc/30min (%) (%) TYPE
13-3/8" 9 10 6 2 4 25 0 2 LIGHTLY
to to to to to to to to to TREATED
5400 9.5 15 10 4 10 15 6 POLYMER
5400 9.5 10 6 2 4 15 0 2 LIGHTLY
to to to to to to to to to TREATED
9-5/8" 9.7 15 10 4 10 6 5 9 POLYMER
csg pt.
SET 9-5/8" CASING
NOTE:
1. THIS MUD PROGRAM IS ONLY A GUIDELINE. ACTUAL HOLE CONDITIONS WILL DICTATE
THE ACTUAL MUD PROPERTIES.
Naska O~ & Gas Cons.
'AnChorage
13-5/8" 5000 psi BOP STACK DIAGRAM
,I
IPE RAM
[~~LIND RAMS]~~
SPOOL
SPOOL
BRADEN
HEAD
ACCUMULATOR CAPACITY TEST
1. CHECK AND FILL ACCUMULATOR RESERVIOR TO THE PROPER
LEVEL WITH HYDRAULIC FLUID.
2. ASSURE THAT THE ACCUMULATOR PRESSURE IS 3000 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH THE CHARGING PUMP OFF.
4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT
IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRES-
SURE.
13-5/8" STACK TEST
1. FILL BOP STACK AND MANIFOLD WITH A NON-FREEZING FLUID.
2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED.
MARK THE RUNNING JOINT WITH PREDETERMINED PLUG SEATING
DEPTH. RUN THE TEST PLUG ON DRILL PIPE AND SEAT IN WELL-
HEAD.
3. CLOSE ANNULAR PREVENTER AND UPSTREAM VALVES.
4. FUNCTION TEST CHOKES.
5. IN EACH TEST, FIRST HOLD 250 PSI FOR 3 MINUTES PRIOR TO THE
HIGH PPRERSSURE TEST.
6. INCREASE PRESSURE ON ANNULAR TO 3000 PSI AND HOLD FOR 3
MINUTES. BLEED PRESSURE TO ZERO.
7. OPEN ANNULAR PREVENTER AND CLOSE TOP PIPE RAMS.
INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES.
BLEED PRESSURE TO ZERO.
8. CLOSE VALVES DIRECTLY UPSTREAM OF THE CHOKES AND OPEN
CHOKES. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3
MINUTES. BLEED PRESSURE TO ZERO.
9. OPEN TOP SET OF PIPE RAMS. CLOSE BOTTOM PIPE RAMS.
INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES.
BLEED PRESSURE TO ZERO.
10. TEST REMAINING MANIFOLD VALVES (IF ANY) WITH 5000 PSI
UPSTREAM OF THE VALVE AND ZERO PRESSURE DOWNSTREAM.
11. BLEED PRESSURE TO ZERO. OPEN BOTTOM PIPE RAMS.
12. BACK OFF RUNNING JOINT AND POH. CLOSE BLIND RAMS AND
TEST TO 5000 PSI FOR 3 MINUTES.
13. BLEED OFF ALL PRESSURE. OPEN BLIND RAMS. FILL MANIFOLD
MAR -1 1990
A chomge
AND LINES WITH NON-FREEZING FLUID. SET ALL VALVES IN THE
DRILLING POSITION.
14. TEST STANDPIPE VALVES TO 5000 PSI.
15. CHECK DEGASSER OPERATION.
16. RECORD BOP TEST INFORMATION ON THE BOP TEST FORM SIGN
AND SEND TO DRILLING SUPERVISOR.
17. PERFORM COMPLETE BOP TEST WEEKLY AND FUNCTION TEST
DAILY.
NABORS 28E DIVERTER SYSTEM
ARCO ALASKA, INC.
FILL-UP LINE
RISER
FLOWUNE
I
20" 2000 P~
DIVERTER
I
10" BALL VALVE
L,.
I
1
CONDUCTORI
I
10" BALL VALVE
I
NOTE:
ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES.
THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE
THE USE OF THE SECOND VENT LINE. THE SECOND VENT LINE VALVE CAN
BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS
RECEIVED
THIS IS A VARIANCE FROM 20AAC25.035.
RESERVE PIT
10" VENT LINE
I_o_1
10" VENT UNE
DIVERTER LINES DISCHARGE 100 FT. FROM RIG IGNITION SOURCE.
ALL TURNS ARE TARGETED TEES.
MAR - 1 1990
Nasla 0il & Gas Cons. CommiSSiO. P
Anchorage
NABORS 28E
SYSTEM
PIT #1
130 BBLS
PIT #2
81 BBLS
PIT #5
117 BBLS
PILL PIT
20 BBLS
PIT #6
135 BBLS
TRIP TANK
170 BBL$
PIT #3
137 BBLS
PIT $4
17 9 BBLS
EQUIPMENT - DRILLING FLUID SYSTEM
(3) DERRICK FLO-LINE CT.~.ANER
(1) DERRICK MUD CLEANER
(1) BRANDT CF-2 CENTRIFUGE
(1) PIONEER MARK I CENTRIFUGE
(1) RIG BUILT GAS BUSTER
(1) DRILCO DEGASSER
(1) PVT SENSOR PER PIT
w/ visual and audio warning devices
(1) AGITATOR PER PIT
(1) DRILLING FLOW SHOW SENSOR
W/ readout convenient to the driller's console
MAR-1 1990
Alaska 0il & Gas Cons. comm~SSl~
'Ancfiom~e
CHECK LIST FOR NEW WELL PERMITS
ITEM APPROVE DATE
(1) Fee ~
(2) Loc
(~2qhru 8~
(8)
, _
(10 and 13)
(4) Casg .,~-~.~..,~, ~-7-~'r_)
(14 thru 22)
Comp any ./~z- ~
1. Is the permit fee attached ..........................................
(5) BOPE
(23 thru 28)
Lease & Well No.
YES NO
-4-_ --
2. Is well to' be located in a defined pool .............................
3. Is well located proper distance from property line ..................
4. Is well located proper distance from other wells ....................
5. Is sufficient undedicated acreage available in this pool ............
6. Is well to be deviated and is wellbore plat included ................
7. Is operator the only affected party .................................
8. Can permit be approved before fifteen-day wait ......................
e
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
Does operator have a bond in force .................................. .. f
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is the lease number appropriate ..................................... ~
Does the well have a unique name and number ......................... ~
Is conductor string provided ........................................
Will surface casing protect all zones reasonably expected to
serve as an underground, source of drinking water .....................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ...
Will cement cover all known productive horizons .....................
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old we!lbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................
Is a diverter system required .......................................
Is the drilling fluid program schematic and list of equipment adequate
Are necessary diagrams and descriptions of diverter and BOPE attached. ~
Does BOPE have sufficient pressure rating - Test to ~O~P psig ..
Does the choke manifold comply w/API RP-53 (May 84) ..................
Is the presence of H2S gas probable .................................
(6) Add:
Geology :~
DWJ~
Engineering:
LCS -- i_::, .-
rev: 01/30/89
6.011
For
29.
30.
31.
32.
exploratory and Stratigraphic wells:
Are data presented on potential overpressure zones? .................
Are seismic analysis data presented on shallow gas zones ............
If an offshore loc., are survey results of seabed conditions presented
Additional requirements ............................................. ~
Additional Remarks:
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE