Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout190-062= L0~%TION Sta~a cf Alaska ALASX~ 0iL & GAS C-'~SERVATION CCHMISSiON suauus~ an~ !ocaUlcn clearance - or=vi~e loc. c.!ear, code. Well hear Code · · STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well OIL D GAS D SUSPENDED D ABANDONED I'~ SERVICE D 2. Name of Operator 7. Permit Number BP Exploration (Alaska), Inc. 190-062 3. Address 8. APl Number P. O. Box 196612 Anchorage, AK 99519-6612 50-029-22050 4. Location of well at surface l [,OC~TI~ 9. Unit or Lease Name 1624' FNL, 4030' FEL, Sec. 24, T10N, R15E, UM (asp's 720031, 5929328)~!fl~l~~~ , i_ Prudhoe Bay Unit At Top Producing Interval ~ [ 10. Well Number 1264' FNL, 863' FEL, Sec. 25, T10N, R15E, UM (asp's 723343, 5924502) !~ ~ 16-23 At Total Depth ' 11. Field and Pool 1407' FNL, 782' FEL, Sec. 25, T10N, R15E, UM (asp's 723428, 5924362) Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 70 feetI ADL 28333 Prudhoe Bay Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if offshore 16. No. of Completions June 3, 1990 June 16, 1990 April 8, 2001 (P&A'd) I N/A feetMSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness o! Permafrost 11995' MD / 9178' TVD 11720' MD / 8997' TVD YES r~ No [-1I 2249' feet MD 1900' (approx) 22. Type Electric or Other Logs Run DIFL/ZDL/CN/GR/SP, GCT, CET/CBT/GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD I CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD] AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 1775# Poleset 10-3/4" 45.5# J-55 Surface 3445' 13-1/2" 1000 Sx Cs III, 300 Sx Class G, & Top Job 155 Sx CS II 7-5/8" 29.7# L-80 Surface 11981' 9-7/8" 260 Sx Class G 5-1/2" 17# L-80 6849' 11600' 9-7/8" 290 Sx C lass G 24. Pedorations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-1/2", 9.2#, L-80 6820' 11346' 2-7/8", 6.5#, L-80 11340' 3-1/2", 9.2#, L-80 11350' * Plugged & Abandoned all open perforation intervals. 2-7/8", 6.5#, L-80 11570' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED (See P&A Summary) 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lilt, etc.) N/A Plugged & Abandoned Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS'OIL RATIO I N/A Test Period -> Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) Press. 24-Hour Rate > 28. CORE DATA o -;'~ Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. ~ '~ * This 10-407 is submitted as directed per the 10-403 form approved March 21,2001 (Approval #301-049) ~"~,l ** The 10-403 was verbally approved by Tom Maunder on March 13, 2001. U,-I ~ Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE n ! !NAL 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and MEAS. DEPTH TRUE VERT. DEPTH gravity, GOR, and time ot each phase. Top of Sadlerochit 11777' 9034' HOT 11839' 9075' N/A "31. LIST OF ATTACHMENTS Summary of 16-23 Pre Rig Sidetrack Plug & Abandonment Operations. 32. I hereby certify that~e and correct to the best of my knowledge. Signe~~~~'~ Title BP Drill n.q Engineer Date June 18, 2001 Phil Smith INSTRUCTIONS Prepared by Paul Rauf 564-5799. General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. RECEIVED Item 28: If no cores taken, indicate "none". JUN 2 ,5 Z001 Form 10-407 Alaska Oil & Gas Cons. Commission Anchorage 16-23 DESCRIPTION OF WORK COMPLETED PRE RIG SIDETRACK PLUG & ABANDOMENT SUMMARY Date Event Summary 3/15/2001: 3/19/2001: 3/21/2001: 3/23/2001: 3/30/2001 - 4/01/2001: 4/02/2001: 4/03/2001: 4/04/2001: 4/05/2001: 4/06/2001: 4/07/2001: 4/08/2001: 4/09/2001: RIH & pulled GLV. Tagged PBTD @ 11840'. Pumped Diesel / Xylene. MIRU CTU. PT'd BOP. Circulated IA w/SLK 1% KCI Water & Crude. RIH & tagged PBTD @ 11846'. Pumped a gelled sand slurry consisting of 1000 lbs of 20/40 mesh Carbolite (to prevent the TT / packer from falling below the level of the scab liner during upcoming milling operations). Made a final TOS tag @ 11808'. POOH. RD CTU. RIH & tagged TOS @ 11820'. RIH w/2-1/8" cutter & chem cut the 2-7/8" tubing @ 11333.5'. MIRU Nabors 7ES Rig. Accepted Rig 1100 hrs 4/1/2001. Monitored well- U-tubing. Circulated Brine. ND tree & NU BOP. PT'd BOP. RU fishing tools to pull tubing hanger. Backed out lock downs. Stabbed into & pulled liner hanger to floor. Completed POOH w/decompletion assembly (212 joints of 3-1/2" & 139 joints of 2-7/8" tubing). RIH w/fishing tools to 11334' (location of chem cut) & engaged fish. POOH w/tubing stub & K anchor. LD fish. RIH & milled packer to 11349'. Pushed it to 11377'. Pumped sweep. Circ'd well. POOH. Successfully fished packer mandrell & tail pipe f/well. RU SLU. RIH w/gauge ring & junk basket to TOS @ 11821'. POOH. Ran PDS Caliper log w/SL f/11821' to 11575' & POOH. RIH w/3-5/8" dummy whipstock to BTM & POOH. RD SLU. Established injection - 6.0 bpm @ 1720 psi. RU ELU. RIH w/GR & logged well. POOH w/logging tools. RIH & set whipstock @ 11735' (top of whipstock). POOH. RD ELU. A Cement Plug was pumped to Plug & Abandon the lower wellbore p~or to Rig ST operations as follows: RIH & pumped 15 bbls of Class G Cement through the ¼ whipstock to abandon the open perforation intervals located from: 11790' - 11847' MD (Zone 4) Reference Log: DIL 6/18/1990. Attained a max squeeze press of 2425 psi for 20 min. Dressed off green cement to 11512'. Circulated BTM's up. POOH. RIH w/milling BHA & cleaned out cement to 11720'. Pumped Hi-Vis sweep & circulated hole clean. PT'd casing to 4000 psi for 30 min - passed. POOH w/BHA. PT'd BOP. RIH w/motor & mill. Tagged TOC @ 11720'. Commenced window milling'X,,~ operations. Continued w/16-23A Rig Sidetracking Operations w/Nabors 7ES.. ,, ,-'"-'~ STATE OF ALASKA ~, ALASK, ~IL AND GAS CONSERVATION COM~ ,SION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development RKB = 70' [] Exploratory 7. Unit or Property Name [] Stratigraphic Prudhoe Bay Unit 3. Address [] Service P.O. Box 196612, Anchorage, Alaska 99519-6612 RECEtv WellNumber 4. Location of well at surface V' '/" ~/' -~'~ ~ .... 16-23 1624' SNL, 1249' EWL, SEC. 24, T10N, R15E, UM 9. Permit Nu. rr~er 190-062 At top of productive interval J~/],R 0 ? 20 01 10. APl Number 1264' SNL, 4416' EWL, SEC. 25, T10N, R15E, UM 50- 029-22050-00 At effective depth Alaska Oil & Gas Cons. Commission 11. Field and Pool 1343' SNL, 4461' EWL, SEC. 25, T10N, R15E, UM At total depth ~ Anchorage Prudhoe Bay Field / Prudhoe 1407' SNL, 4496' EWL, SEC. 25, T10N, R15E, UM Bay Pool 12. Present well condition summary Total depth: measured 11995 feet Plugs (measured) true vertical 9178 feet Effective depth: measured 11898 feet Junk (measured) true vertical 9114 feet Casing Length Size Cemented MD TVD Structural Conductor 110' 20" 1775# Poleset 110' 110' Surface 3375' 10-3/4" 1000 sx CS III, 300 sx 'G', 155 sx CS 3445' 3444' Intermediate Production Liner 11911' 7-5/8" 260 sx Class 'G' 11981' 9169' Scab Liner 4751' 5-1/2" 290 sx Class 'G' 6849' - 11600' 6091' - 8918' Perforation depth: measured 11790' - 11847' (eight intervals) true vertical 9043' - 9081' (eight intervals) Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80 to 6820'; 2-7/8", 6.5#, L-80 to 1 t340', 3-1/2", 9.2#, L-80 to 11350'; 2-7/8", 6.5#, L-80 to 11570' Packers and SSSV (type and measured depth) Baker 'SABL-3' packer at 11346'; Camco 'TRDP' SSSV at 2249' 13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch 14. Estimated date for commencing operation 15. Status of well classifications as: March 15, 2001 [] Oil [] Gas [] Suspended 16. If proposal was verbally approved Name of_~approv~e r O,.~t/~ "~/[ ~.. ~) , Service Date Approved Contact Engineer Name~Number Phil S~th, 564-4897 Prepared By Name/Number Terrie Hubble, 564-4628 17. I hereby certify that the foraging is true~a,~d correct to the best of my knowledge Signed Lowell Crane ~--~'~.., ~.~'~_ Title Senior Drilling Engineer Date 3-7''~ Conditions of Approval: Notify Commission so representative may w. itness ~$ (~ ~, '~'~ar~ I Approval No. ~ [-~_.~/-~ q Plug integrity BOP Test ~,. Location clearance Mechanical Integritymest ©RjGl~b,_s~~equired 10- t'~(~'~ ~Approved by order of the Commission ' Commissioner Date Form 10-403 Rev. 06/15/88 ......... , ~ ~ ~ Submit In~'FriDlii:ate RECEIVED 0 7 ZOO1 Alaska 0il & Gas Cons. Commission Anchorage Date: March 5, 2001 commissioner ' AoGCC From: Phil G. Smith DS16-23 Application tot sundry Permit- p&A tot Sidetrack operations Subiect: Reference: APt #50.029-22050DS16-23 perforation p&A. The well is currently shut-in due to is proposed to re-locate asphaltene, and The sidetrack will replace the current wellbore sundrY approval is requested for the proposed hydrates. A sidetrack he sidetrack is currently rvoir to the N.W... i inal target. T River ice bridge.. · rt of the rese w~th the or g · of the Sag nd production, and problems with paraffin, Iow ..... roducttve pa .___ 000 teet fro_m_th ..,.~,~ino completion. _, ^...,ti~ liOn for Su he well ~n ~ more P .' a prox~matelY_~ arch F_b , P~'"'~'_ %,. ~h¢. trachea ~,,,va t .... ~,~,rizontal sect~°?~P~...,,i,nino a~ound .M. ~...,~,, as soon so .... a Wltlrl ~ ?'" hors cj~.~ u~,,....-'_ .~t~nned to scheduled ~or N,a.-~.., ~hiS sidetrack ~ F .... sidetrack operations- The pre-rig worn ,~, .... of the proposed p&A and approved. Below is an outline * Notify the field AoGCC representative with intent to plug and abandon Dummy off GLM's as required for CTU work. The sand will keep the nd to raise top of fill to 11,810' 1. RU slickline and drift the tubing, tag 'i'D. 0asr tag at 11,836'). ...,, r.-r~ ~ I~v carbohte sa~ __ .,.,.~,nino below the 5 Y2" scab liner atter milling. · Attempt to 2. ~U slickline, verity top o~ ~,, · he lowermost 10' pup ~oint above the production packer. ' -acker/taiipipe a?~'"~, t~--d with 210 bblS 9.3 PPg NaCI ~ollowed by 95 bbls · fishing. 3. 2-7/8" tubing ~n t - 6' stub for · . This will freeze protect 4. chemical cut the ~oint to leave at ~east a cut in the 1/3 ot the pup_. erse circul~e the annulU~lowe~ by 17 b~ 4,esel 8 54 PPg sBHP at last ..... ~ ~eawate~. Re~ _. ~, 9 3 opg NaCI fo _., the oedu~attons ( · ill the well w~t, o in with/~ u~,o _- - ~ 8 7+ PPg 5. K. ullhead the ~b g ,~ ~ eauivalent ~ ' diesel. B ~.~, ~d orowu~ .... TRSSSV- the well to zuuu ..... su~eY} or ~90 psi overbalance- and test from below to 1000 psi. Block open 6. Remove wellhouse and flowlines. Level the pad and provide the total well preparation Set a BPV in the tubing hanger 7. Secure the well. cost on the handover form. ~ate out freeze protection fluid. Set TWC 250 psi Iow / 3500 psi high., pull 'fWC. 1..P.? ..... ~,~U and test BoPE to .... ~,emicai cut at +_11,330 i..,.~..stock Nu uu~, ,- ' rom u~ ,.,, , m w,,¥ · ,,quick-turnaround" of 23' ., ia down tubing.! _ nd depth w,th du,m__Y ,,,~ ab liner. Request a p?l a..n_(::l . Y nd drift to the tup o.t 4~ RU shukhne a -, ~¢t,, r. as~ny" ...... - '~,,,~ pDS log across ¢ ~"~' v , ..... *~ at 11,729' MD. Adiust whipstock orientation with 5. ',~; ;og interpr_,et~atei~f~e whipstock hlghside ,o zlcr, ~s';ttTng he slips in corroded casing. 6. prior to Rill as required to avoid Stop RIH to iust above whipstock RU e-line aha ~ ' ' the whipstock. offset weight barS 7. RIH with 3-1/2" DP and cement nozzle. DO NOT TAG depth. , 10. 11. 12. 13. 14. 15. 16. 8. Circulate 10 bbls cement to the end of drill pipe, shut in and bullhead squeeze the cement to cover the perforations and whipstock. Hesitate squeeze as necessary. Circulate to dress off op of cement to 11,675' MD (50' above whipstock). MU 4.8" window milling assembly and RIH to top of cement. Test 7" casing to 3500 psi for 30 mins. Dress-off cement and mill window. RIH w/4 3,4" directional BHA to window depth. Drill 4 3,4,, hole as per directional plan to TD. Make wiper trip as hole conditions require and spot liner running pill across open hole section. Run 3 Y2", 9.3#, L-80 liner to TD with liner lap to 50' inside the 5 1/2" scab liner. Cement in place and hang-off on Baker ZXP/HMC liner top packer/hanger. Drop drill pipe dart & displace cement with perforating pill and seawater. Displace the well to clean seawater above the liner top. POOH w/liner running tool. Pick-up required length of 2 1/16" CS Hydril workstring & perforate 3 1/2" liner. Run 4 1/2" x 3 1/2", 12.6# L-80 tubing, packer, WLEG, profile nipples, GLM's, & SSSV(Xnipple). See attached completion schematic for details. Reverse circulate the well to clean, inhibited seawater,. 17. Drop setting ball and rod, set production packer and test tubing and annulus to 3500 psi. 18. Install two-way check. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 19. Pull the TWC. 20. Reverse circulate sufficient diesel to freeze protect the tubing and annulus to 2000' U-tube the diesel. Install & test BPV. Secure the well and rig down / move off. Post-Riq Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the new production packer. Install gas lift valves. Estimated Pre-rig Start Date: Estimated Spud Date: Phil G. Smith Operations Drilling Engineer 564-4897 03/15/01 03/25/01 RECEIVED MAR O ? 2001 Alaska Oil & Gas Cons. Commission Anchorage DRI, SITE 16-23 Current Schem, I,~ ~ TRSV Tubing: 3 1/2" 9.2# L-80 Premium Thrd.~ ~ ~ /J---- 3 1/2" Gas Lift MandrelNalve 1 ~- ~ 3 112" Gas Lift Mandrel/Valve 2 Casing: 10 3/4" 45.50# K-55 3,446'~ ~, ,~ ~--~3 112" Gas Lift Mandrel/Valve 3 , I 1 ' Crossover 3 112" x 2 718" i Top of 5 1/2" Liner 6,849'  I 3 112" Gas Lift Mandrel/Valve 4 Tubing: 2 718" 6.50# k-80 Premium Thrd.-- i ~ 3 1/2" Gas Lift Mandrel/Valve 5  3 112" Gas Lift Mandrel/Valve 6 :i!ii /~ ~ 3 1/2" Gas Lift MandrelNalve 7 !i~i:i I I ~ ~ 2 7/8" HES 'X' Nipple Tubing: 3 1/2" @.2# k-80 Premium Thrd: --1. ~ Scab Liner: 5 112" 17.00# k-80 Packer 11,346' i~ X ~-- ~ Crossover 3 1/2" x 2 7/8" ffi I ~ 2 7/8" HES 'X' Nipple Tubing: 2 718" 6.50# k-80 Premium 'l'hrd.-- i ~ .~ ,~:.~,~'~::~ I I -- ~ 2 7/8" Parker SWN Nipple RECEIVED ' i Bottom of 5 1/2" Liner 11,600' IV1AR 0 ? Z001 ,TopPed. 11,790' Alaska Oil & Gas Cons. Commission ^nchora§e ----; - Last Tag (1/11/00) 11,836' PBD 11,898' DATE REV. BY COMMENTS 12-18-00 SRKA Current Schematic pRUDHOE BAY UNIT WELL: 16-23A BP Exploration (Atask:a) THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE OCTOBER 27, 2000 E E C:LORruMFILM.DOC PL E W M A TE R IA L U N D ER TH IS M ARK ER -", STATE OF ALASKA ALAS,.,-, OIL AND GAS CONSERVATION L;OMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate X Pull tubing Alter casing ~ Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1624' SNL, 1249' EWL, Sec 24, T10N, R15E, UM. At top of productive interval 1264' SNL, 861' WEL, Sec 25, T10N, R15E, UM. At effective depth At total depth 1407' SNL, 78O' WEL, Sec 25, T10N, R15E, UM. 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 7O' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 16-23 9. Permit number/approval number 90-62 10. APl number 50 - 029-22050 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 11995 feet 9182 feet Plugs(measured) Fill cleanout to 11850' MD (10/21/96) Effective depth: measured 11850 feet true vertical 9091 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 110' 20" 1775¢ Poleset 110' 110' Surface 3375' 10-3/4" 1000 Sx CS III, 300 Sx CI G, & 3445' 3445' 155 Sx CS II Liner 11911' 7-5/8" 260 Sx Cl G 11981' 9170' ScabLiner 4751' 5-1/2" 290SxOIG I'~l"""l~i"""lVl-b~49-11600' 6096-8312' JAN 0 7 1997 Perforation depth: measured 11790 - 11847' Alaska 0il & Gas Cons. Commission true vertical 9052 - 9089' Anchorage Tubing (size, grade, and measured depth) 3-1/2", 9.2¢, L-80, NSCT Tbg @ 6820'; 2-7/8", 6.5¢, L-80, EUE Tbg @ 11340'; 3-1/2", 9.2¢, L-80 NSCT Tbg @ 11350; 2-7/8", 6.5¢, L-80, Tbg @ 11570' MD. Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 11346' MD; Camco TRDP SSSV @ 2249' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached Treatment description including volumes used and final pressure ORIGINAL 14. Prior to well operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Shut In .... Tubing Pressure . Subsequent to operation Shut In 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Form 10-404 Rev 06/15/88 Title Engineering Supervisor Date SUBMIT IN DUPLICATE 16-23 DESCRIPTION OF WORK COMPLETED HUFF & PUFF STIMULATION PILOT PROJECT 7/3/96: RIH & tagged PBTD at 11814' MD. 7/1 7/96: A Pre Huff & Puff Fill Cleanout & Diesel/Xylene Perforation Wash were performed as follows: MI RU CTU & PT equipment. RIH w/nozzle & jetted 1% KCI Water followed by Crude, for fill cleanout to 11870' MD. Swapped to reciprocating 44 bbls of 50% Diesel/50% Xylene across the perforations at: 11790 - 11826' MD (Z4) Ref. Log: DIL 6/18/90. SI well & squeezed away all Diesel/Xylene fluids through the perfs @ 1.75 bpm/1950 whp. Swapped back to circulating 1% KCI Water & POOH w/CT. Rigged down. 9/1 5/96: Attempted to place the well on initial miscible injection. The well would not take injection. 9/16/96: A Pre Huff & Puff Crude High Pressure Breakdown Treatment was pumped fullbore as follows: MIRU & PT equipment to 4500 psi. Pumped 200 bbls of Crude @ 3.5 - 4.6 bpm through the perforations (listed above). Averaged injection of 4.3 bpm/3500 psi during treatment. Followed Crude w/MI injection immediately after job. Could not establish MI injection. RD. 9/22/96: A Pre Huff & Puff High Pressure Breakdown Treatment was pumped fullbore as follows: MIRU & PT equipment to 8800 psi. Pumped a fullbore treatment through the perfs (above). Pumped: a) b) c) d) e) f) g) h) 133 bbls Seawater Flush @ 7 i) Shutdown. ISIP @ 1700 psi. 50 bbls Xylene @ 6 bpm, followed by 50 bbls Gelled Diesel @ 10 bpm/4000 psi, followed by 10 bbls Diesel w/rock salt diverter to 5750 psi w/break to 4200 psi, followed by 50 bbls Gelled Diesel, followed by 10 bbls Diesel w/rock salt diverter @ 14 bpm/3800 psi to 5800 psi max, followed by 60 bbls Gelled Diesel, followed by 10 bbls Diesel w/rock salt diverter to 7200 psi w/break to 6600 psi, followed by - 15 bpm, followed by Attained max treating pressure of 7300 psi & averaged 4481 psi during the treatment. RD. 9/23/96: Attempted to establish MI injection to well. 1 0/3/96: Reperforated: Could not establish a measurable MI injection rate. 11790 - 11826' MD (Z4) Ref. Log: DIL 6/18/90. Added Perforations: 11826 - 11847' MD (Z4) Ref. Log: DIL 6/18/90. Used 1-11/16" carriers & shot perfs at 6 spf, except 11827' - 11830' which was shot @ 12 spf. Shot perfs at 0 degree phasing at balanced pressures. POOH w/guns. Noted all shots fired. RD. 16-23 DESCRIPTION OF WORK COMPLETED HUFF & PUFF STIMULATION PILOT PROJECT 10/5/96: Attempted to establish MI injection to well. Could not establish a measurable MI injection rate. I 0/2 I/9 6: A Fullbore Acid Stimulation Treatment was pumped to enable improved MI Injection as follows: MIRU & PT equipment. Pumped acid treatment fluids through the perforation intervals (above). Pumped: a) 100 bbls 2% NH4CI Water to load well, followed by b) Shutdown for 10 minutes. Resumed pumping: c) 40 bbls 2% NH4CI Water @ 2/4/6/8 bpm rates for step rate test, followed by d) 50 bbls 12% HCI w/10% Xylene, followed by e) 25 bbls 9% HCI - 1% HF, followed by f) 25 bbls 12% HCI w/10% Xylene, followed by g) 100 bbls 2% NH4CI Water Flush @ 4 - 6 bpm, followed by h) 20 bbls Benzoic Acid Flake Diverter in 24% NH4CI solution @ 4 bpm, followed by i) 50 bbls 12% HCI w/10% Xylene, followed by j) 25 bbls 9% HCI- 1% HF, followed by k) 25 bbls 12% HCI w/10% Xylene, followed by I) 100 bbls 2% NH4CI Water Flush @ 4 - 6 bpm, followed by m) 32 bbls Benzoic Acid Flake Diverter in 24% NH4CI solution @ 4 bpm, followed by n) 50 bbls 12% HCI w/10% Xylene, followed by o) 23 bbls 9% HCI - 1% HF, followed by p) 17 bbls 12% HCI w/10% Xylene, followed by q) Shutdown. Well locked up w/BAF stage on formation. PU to 4500 psi on well & rocked well between 4500 - 100 psi. Well locked up; could not flow well back to tank. Rigged down & MOL. MIRU CTU & PT equipment. RIH w/nozzle & jetted: r) 80 bbls Meth Water to circulate stimulation fluids from wellbore, followed by s) 200 bbls 2% NH4CI Water, followed by t) 10 bbls Meth Water, followed by u) 16 bbls 100% Methanol to jet perfs & jet past obstructions at 11747' MD, followed by v) 220 bbls 2% NH4CI Water to jet to 11850' MD & jet ©OH w/CT. Performed injectivity test w/injection @ 1.4 bpm/1300 psi. RDMO CTU. Returned the well to MI & attempted to obtain a valid MI injection rate. The well took MI at below meterable rates. The cumulative MI injection volume placed through 10/31/96 is estimated to be less than 45 MMscf. MI had been < 1 MMscf/day @ 3300 whp. I 1/20/96: Completed MI injection project. Disassembled MI Huff n' Puff project injection line to well. Placed well on production. Well would not flow. SI well. Evaluating future work options. STATE OF ALASKA ~ ALASK?-"')IL AND GAS CONSERVATION C 'vlMISSION REPOR'[ OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development , ,.X Exploratory Stratigraphic Service ,,, 4. Location of well at surface 1624' SNL, 1249' EWL, Sec. 24, T10N, R15E, UM 6. Datum of elevation(DF or KB) 70' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 16-23 At top of productive interval 1264' SNL, 861' WEL, Sec. 25, T10N, R15E, UM At effective depth At total depth 1407' SNL, 780' WEL, Sec. 25, T10N, R15E, UM 1'2. Present well condition summary APR 2. 4 1995 Oil & Gas Cons. Commission Ntchora. '~ feet 9. Permit number/approval number 90-62 10. APl number 50 - 029-22050 11. Field/Pool Prudhoe Bay Oil Pool Total depth: measured 11995 feet true vertical 9178 feet ORIGi':,,;A Effective depth: measured 11820 feet true vertical 9072 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth! Conductor 110' 20" 1775# Poleset 110' 110' Surface 3375' 10-3/4" 1000 sx CS III 300 sx G, 155 sx CS II 3445' 3445' Liner 11911' 7-5/8" 260 sx CIG 11981' 9170' Scab Liner 4751' 5-1/2" 290 sx G 6849'-11600' 6096'-8312' Plugs(measured) PBTD Tagged @ 11820' MD (4/03/95) Perforation depth: measured 11790-11826' true vertical 9052-9076' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, NSCT @ 0-6820', 11340-11350' MD; 2-7/8", 6.5#, L-80, EUE Tbg @ 6820-11340', 11350-11570' MD Packers and SSSV (type and measured depth) Baker "BABL-3" packer @ 11346' MD; Camco "TRDP" SSSV @ 2249' MD 13. Stimulation or cement squeeze summary 14. Intervals treated(measured) SEE ATTACH ED Treatment description including volumes used and final pressure Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Prior to well operation 54 277 354 -- Subsequent to operation 97 625 163 -- Tubing Pressure 279 274 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Oil. X... Gas ,. Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~'~.~ ~/). /Z~,I...~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 cc: KZ, JWP Date SUBMIT IN DUPLICATE 16-23 DESCRIPTION OF WORK COMPLETED MICROBIAL TREATMENT & PERFORATING OPERATIONS 3/4/95: RIH & tagged PBTD at 11826' MD. 3/9/95: A Fullbore Microbial Treatment was performed as follows: MIRU & PT equipment. Pumped 45 bbls Seawater, followed by 62.5 bbls Seawater w/Microbes, through the perforation intervals located at: 11790 - 11799' MD (Z4) 11802 - 11826' MD (Z4) Ref. Log: DIL 6/18/90. Followed Microbial Solution w/276 bbls Seawater Overflush @ 4 bpm, followed by 85 bbls Crude, followed by 5 bbls Diesel, followed by Shutdown. Rigged down. 4/3/95: MIRU & PT equipment. RIH w/perforating guns & tagged PBTD at 11820' MD, then PU & shot 30' of perforations as follows: Reperforated: 11790 - 11799' MD (Z4) Ref. Log: DIL 6/18/90. 11802 - 11819' MD (Z4) Added Perforations: 11799 - 11802' MD (Z4) Ref. Log: DIL 6/18/90. Used 1-11/16" guns & shot 6 spf at 0 degree phasing, at underbalanced pressures. POOH w/perf guns. Noted all shots fired. Rigged down. Returned the well to production w/gas lift & obtained a valid welltest. Well: 16-23 Spud Date: 06/04/90 Original RKBE: 70' Top of Formation: Ai.,O Alaska, Inc. - Prudhoe API #: 50-029-22050-00 Complet ion: 0 9/2 2 / 94 Hanger Type:FMC Gen IV 11777' Max Hole Angle: 57° @ MD: 6400' Annular Fluid:Diesel 6.8/8.5 Seawater Reference Log:DIL Date:06/18/90 Tie In:GR/CCL Type:PRODUCER Status:Workover Hanger:26' Angle @ TS:48° Angle @ TD:49° Date: 03/31/95 ALL DEPTHS ARE RKB DRILLING MD TO TOP OF EQUIPMENT EXCEPT WHERE Jewelry (J) Depth Description 1 2249' 2 6820' J-1 3 11285' 4 11340' 5 11346' O- 1 6 11350' 7 11539' G- 1 8 11557' J-2 9 11570' 3-1/2" Camso TRDP SSSV Nipple ID=2.812" Crossover 3-1/2" x 2-7/8" 2-7/8" HES X Nipple ID=2.313" Crossover 2-7/8" x 3-1/2" 5-1/2" x 3-1/2" Baker SABL-3 Packer Crossover 3-1/2" x 2-7/8" 2-7/8" HES X Nipple ID=2.313" 2-7/8" Parker S~N Nipple ID=2.25" 2-7/8" Tdoir~ Tail W/L Re-entry Guide ELM Tubirg Tail (Not Logged) ID: 2-7/8" Parker SWN Nipple ID=2.25" J-3 J-4 J-5 J-6 J-7 J-8,9 C-3 P-1 Casing and Tubing (C) Size Weight Grade Top 10-3/4" 45.5# K-55 0' 7-5/8" 29.7# L-80 0' 5-1/2" 17# L-80 6849' 3-1/2" 9.2# L-80 0' 2-7/8" 6.5# L-80 6820' 3-1/2" 9.2# L-80 11340' 2-7/8" 6.5# L-80 11350' Gas 3341' (3340 6710' (6008 6801' (6062 8722' (7194 8843' (7265 10130' (8026 10440' (8211 Lift Information (G) TVD StnMandrel BottomDescription 3446 11898 11600 6820 11340 11350 11570 Valve Type Latch Port ) 1 CA-MMG CA R-20 RK 1/4" ) 2 CA-MMG CA R-20 RK 1/4" ) 3 CA-MM$ CA RD RK ) 4 CA-KBM~ CA E BK ) 5 CA-KBM3 CA E BK ) 6 CA-KP/v~S CA E BK ) 7 CA-KRv~ CA BI< t~K-2 3/8" Perforation Interval Zone 1 11790-11799 4 11799-11800 4 11800-11802 4 11802-11819 4 11819-11826 4 Data (ELM DEPTHS) (P) FT SPF Date 9 8 04/03/95 1 12 04/03/95 2 6 04/03/95 17 8 04/03/95 7 2 07/06/90 Comment s RMERF RPERF APERF RPERF IPEEF NOTED. TRO Date 1922 09/27/94 1857 09/27/94 09/22/94 09/22/94 09/22/94 09/22/94 ORIF 09/27/94 C-2 FRAC 10/08/90 Not Arctic Packed Datum 8700' SS=1t364' MD 8800' SS=11524' MD PBTD=l1898' TD=11995' Revision Date: 04/13/95 by ENH Reason: RPHRF/~ Previcus Reascn: 10/08/94 Well 16-23 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN.- Sherrie NO. 9409 Company: 4/1 3/95 Alaska Oil & Gas Cons Comm Attn- Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field- Prudhoe Bay FloPpy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 1-22A 95110 MWDGR 010995 1 D.S. 15-08A 951 48 MWDGR 1 0'2693 1 D.S. 2-24 PROD PROFILE 040395 I 1 D.S. 3-19 INFLATABLE BRIDGE PLUG 040395 1 1 ,,, D.S. 5-12 PROD PROFILE 040395 1 1 D.S. 9-25 PERF RECORD 032795 1 1 D.S. 9-25 PERF RECORD 032895~ I 1 , , D.S. 9-40 PERFRECORD 0331 95 1 1 I D.S. 11-6 i PATCH SETTING RECORD 032595 1 1 D.S. 14-3 PATCH SETTING RECORD 040495 I 1 ,, D.S. 15-17 GCT 040595 I 1 D.S. 16-23 COLLAR & JEWELRY LOG 0331 95 I 1 D.S. 16-23 PERF RECORD 040395 I 1 .... D.S. 18-02A GCT 0401 95 1 1 .... ...... It E Ei I. APR 1 SIGNED: DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate.. . Plugging Pull tubing X Alter casing ~_ Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. "3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1624' SNL, 1249' EWL, SEC. 24, TION, R15E At top of productive interval 1264' SNL, 861' WEL, SEC. 25, TION, R15E At effective depth At total depth 1407' SNL, 780' WEL, SEC. 25, TION, R15E 12. Present well condition summary Total depth: measured 11995 feet true vertical 9178 feet Effective depth: measured 11898 feet true vertical 9114 feet 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 70' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number 16-23 9. Permit number/approval number 90-62~Conservation order #258 10. APl number 50- 029-22050 11. Field/Pool Prudhoe Bay Field~Oil Pool Plugs (measured) Junk (measured) Casing Length Size Cemented Measured depth Structural Conductor Surface Intermediate Production Liner 4751' 5-1/2" 290 sx Class "G" 6849'-11600' Perforation depth: measured True vertical depth 6096'-8312' true vertical Tubing (size, grade, and measured depth) 3-1/2", L-80 tubing to 11350'MD;2-7/8", L-80 tubing tail to 11570'MD Packers and SSSV (type and measured depth) Baker "BABL-3"packer@ 11342'MD; Camco "TRDP"R E E ! /sssv 2~_~MD 13. Stimulation or cement squeeze summary Intervals treated (measured) NOV ;5 0 1994 Treatment description including volumes used and final pressure Ai~sk~ 0il & Gas Cons, Commission Anch0rade 14. Prior to well operation Subsequent to operation Re.Dresentative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Oil X Gas Suspended Service is true the best of my knowledge. 17. I hereby certify that the fore_going, and correct to Signed ~" /~"~' TitleDrillin~En~ineerSupervisor Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: DS 16-23 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 09/06/94 04:00 SPUD: RELEASE: 09/22/94 03:00 OPERATION: DRLG RIG: WO/C RIG: DOYON 16 09/07/94 ( 1) TD:11995 PB:11898 09/08/94 (2) TD:11995 PB:11898 09/09/94 (3) TD:11995 PB:11898 NIPPLE UP BOPE MW: 9.1 NaC1 MOVE AROUND PIT & RIG UP ON SITE 16-23. BERM UP SET IN SEAWATER TANKS SLOP & CUTTINGS TANKS. HOOK UP CONTROLS. CIRC OUT DIESEL, CRUDE & GAS. INSTALL BPV. ND TREE, NU BOPE. INSTALL 3.5 X 6 & 4" BTTM RAMS. TEST BOPE. SMALL LEAK IN BLANKING PLUG. TEST WITNESSED BY B. FOSTER W/AOGCC. RIH W/O'SHOT MW: 9.1 NaC1 COMP. TEST BOPE. UNABLE T/TEST LOWER RAM BECAUSE OF HNGR/LNDG JT. HEIGHT. TEST REMAINING BOPE AGAINST BLINDS. RU LUBR. PULL BPV. MU LNDG JT. PULL HNGR T/FLOOR. INITITAL PU WT 107K. DROPPED T/70K. LD HNGR. CBU HOLE TAKING 60 BPH WHILE CIRC. 5 BPH WHILE STATIC. RU HALIBURTON T/SPOOL CL. POOH W/3.5" 9.3# EUE L-80 TBG. LD W/THREAD PROTECTORS. NORM IS OK. RECOVERED 237 JTS. TBG. TBG PARTED 8 LOWER ALPHA SOFT PATCH SET ON 6/10/94 8 7457 MD. ADJACENT T/CRETACEOUS LEAK. VISUALLY THE TBG LOOKED OK. EXCEPT F/LAST 7 JTS OUT WERE SEVERELY CORRODED. 7 GLM'S & 4133' OF TBG REMAIN ABOVE PKR. LD TBG EQUIP. SET TEST PLUG & TEST BOP'S INSTALL WEAR RING. LD 5" KELLY & PU 3.5". MU TRI-STATE BHA W/4.5" O'SHOT W/COLLAR STOP. RIH W/BHA & 3.5" DP. 7-5/8" PKOFF TESTED T/5000. POOH W/BHA #3 MW: 9.1 NaCl TAG FISH 87465'. MU KELLY. WASH OVER FISH, ATTEMPT T/LATCH FAILED. MU BHA #2, DBL O'SHOT ASSY F/4.5" COLLAR & 2-13/16" TBG PATCH. RIH T/650, SLIP & CUT 57' OF DL. RIH T/7440. TAG FISH 8 7465 W/O KELLY. TAG FISH AGAIN, FINAL PU WT l15K, APPEARS LIKE PATCH IS DRAGGING OOH. LD BHA #3, RECOVERED ALL BUT 21' TBG PATCH & TBG COLLAR. SEVERE EXT. CORR. ON 1/2 OF COLLAR. RU ATLAS E-LINE. MU 2.7" JETT CUTTER. RIH T/CUT TBG IN 1ST JT. ABOVE PKR. UNABLE T/GET INSIDE OF TBG. POOH W/JET CUTTER. MU BHA #3, O'SHOT W/3.5" GRAPPLE & 9' EXTENSION. RIH T/7440. MU KELLY. WASH OVER FISH, 9'. PUMP PRESS INCREASED. TAG 8 7465 MD. PU WT-NO INCREASE, PUMP PRESS DROPPED INDICATING 8 LEAST 1 JT. IS POSSIBLY LATCHED. POOH. HOLE HAS BEEN TAKING 5-9 BPH THROUGHOUT THE LAST 24 HRS. NOV 50 ~t a Gas Co~s. comm~s$%o~ ~nchora~ WELL : DS 16-23 OPERATION: RIG : DOYON 16 PAGE: 2 09/10/94 (4) TD:11995 PB:11898 09/11/94 ( 5) TD:11995 PB:11898 PU 4-1/2" TBG WORK STRING MW: 9.1 NaCl CONTINUE POH W/BHA #3. NO RECOVERY. MU AND RIH W/BHA #4. OVERSHOT TWO JTS TBG. T-DOG NOW UNDER COLLAR BELOW SECOND JT. WORK FISH. INCREASE OVERPULL FROM 80K# TO 220K# IN 10K LB INCREMENTS. COULD NOT PULL FISH FREE. ATTEMPT BLIND BACK. RECOVERED 18K# OF FISH. HELD 5 MINUTE SAFETY MEETING BEFORE BLIND BACK OFF OPERATION. POH W/BHA #4 AND FISH. WILL BREAK AND MAKE UP 3-1/2" DP ON NEXT TRIP IN. LD BHA #4. BREAK OUT OVERSHOT AND WASH PIPE. RU TBG TONGS. LD 64 JTS 3-1/2" 9.3# EUE 8RD L-80 TBG & 2 GLM'S W/PUPS. EXTERNAL CORROSION ON MOST JTS. GETTING BETTER AT THE BOTTOM. FISH REMAINING: 1JT (PIN LOOKING UP), 10' PUP, BLM, 2' PUP. 13 JTS, 10' PUP, GLM, 2' PUP, 13 JTS, 10' PUP, GLM, 2' PUP, 15 JTS, 10' PUP, BLM, 2' PUP, 19 JTS, 10' PUP, GLM, 2' PUP, 3 JTS, 6' PUP, PACKER W/ 17' OF SEALS, TAILPIPE. LOAD PIPE SHED W/4-1/2" 12.6# BTC L-80 GRADE B TBG FOR WORK STRING. PU AND RIH W/ WORKSTRING. 5400' PU BY 0600 HRS. SLICK LINE WORKING ON TBG OBST MW: 9.1 NaCl/Br CONTINUE RIH W/BHA #5 ON 4-1/2" TBG WORKSTRING. RU AND LATCH FISH (PIN END OF 3-1/2" TBG) AT 9462' MD - DOYON 16 RKB. RU ATLAS E-LINE FOR FREE POINT AND CHEMICAL CUTS. RIH W/FREE POINT. SET DOWN 3' INSIDE THE TOP GAS LIFT MANDREL. POH. LAY DOWN FREE POINT. PU LIB. RIH AND TAG. POH. IMPRESSION SHOWS ROUND JUNK THAT IS +-2.7 OD X+-2.5" WIDE. THIS COULD POSSIBLY BE A SLEEVE THAT WAS NOT ON THE BOTTOM OF THE TOP PATCH THAT WAS PULLED. RD ATLAS E-LINE. RU OTIS SLICK LINE. RIH WITH ORIENTED LIB. POH. IMPRESSION SAME AS ABOVE. MAKE 4 ATTEMPTS WITH DIFFERENT SLICK LINE BHA. NO RECOVERY. CAN'T GET PASSED. LIB RUN AFTER EVERY ATTEMPT SHOWS OBSTRUCTION NO MOVING. RECEIVED NOV 30 1994 Oil & Gas Cons. Commission Anchora~? WELL : DS 16-23 OPERATION: RIG : DOYON 16 PAGE: 3 09/12/94 (6) TD:11995 PB:11898 09/13/94 ( 7) TD:11995 PB:11898 09/14/94 ( 8) TD:11995 PB:11898 POH W/CHEMICAL CUTTER MW: 9.1 NaC1/Br CONTINUE SLICK LINE FISHING FOR OBSTRUCTION IN COMPLETION. OBSTRUCTION SITTING IN TOP GLM REMAINING IN THE WELL @ 9505' TOP OF TBG FISH 9462'. WORKED FISH OUT OF FIRST MANDREL THEN IT DROPPED DOWN TO SECOND MANDREL @ 9934'. CONTINUE TRYING TO MOVE FISH OUT OF MANDREL. NO SUCCESS. PU 420 LBS OF WEIGHT BAR AND CHISEL BIT IN THE LAST S-LINE RUN TO TRY TO BREAK UP OBSTRUCTION AND PUSH DOWN. HOLE. NO SUCCESS. RIG DOWN OTIS S-LINE. FROM THE LIB BLOCKS, THE OBSTRUCTION SEAMS TO BE A RING OFF THE BOTTOM OF THE TOP PATCH THAT WAS PULLED EARLIER. THE RING IS MADE OF SOMEWHAT HARDENED METAL WITH A 2.75" OD X 1.9" ID X 3.0" TALL. RU ATLAS E-LINE TO CHEMICAL CUT 3-1/2" TBG ABOVE THE OBSTRUCTION. RIH W/CHEMICAL CUTTER. CUT TBG AT TOP OF FIRST 10' PUP JT. ABOVE GLM WITH OBSTRUCTION. THE CHEMICAL CUT WILL BE AT 9927' ON THE TBG TALLY. GOOD E-LINE INDICATION OF CUT. POH W/CUTTER. FISH REMAINING TO PACKER BELOW CHEMICAL CUT ARE 4 GLM'S W/PUPS AND 63 JTS OF 3-1/2" TBG. THE PACKER IS AT 11590' POOH W/BHA #6 & FISH MW: 9.1 NaCl/Br CON'T. POOH W/CHEM CUTTER. PU ON FISH. RD ATLAS E-LINE. TU TBG EQUIP. PULL & LD 4.5" TBG WORKSTRING. BREAK OUT FISH & LD. RECOVER 14 JTS OF 3.5" TBG. 1 GLM W/PUPS. 2' OF CUT OFF JT. RD TBG EQUIP. PU BHA #6. RIH ON 3.5" DP. CHK TRQ ON CONNECTION WHILE RIH. PU 90 JTS. ATTEMPT T/LATCH FISH W/O KELLY. NO GO. PU KELLY, LATCH FISH ( 8' TBG STUB @ 9917' DPM) REMAINING FISH WT ABOVE PKR IN BRINE IS 14K. CBU. NO FILL. 28 UNITS OF COMBUSTIBLE GAS, 8 PPM H2S. POOH W/BHA #6 & FISH. RIH W/SPEAR MW: 9.1 NaCl/Br RU TBG EQUIP. LD 3.5" TBG, 50 JTS & 4 GLM'S W/PUPS. TBG WAS BACKED OFF T/2' BELOW TOP OF LOCATOR. 1' OF SEALS WERE PULLED LEAVING 15' OF SEALS STRILL IN PKR SEAL BORE. RD TBG EQUIP. CLEAN RIG FLOOR. MU BHA #6. RIH ON 3.5" DP. RETORQUE ALL CONNECTIONS WHILE RIH. PU 50 JTS OF DP. MU KELLY. TAG PKR @11580. MILL PKR F/11580 T/11582. CBU. NO GAS ON BTTMS UP. POOH. LD SHOE BHA. PU SPEAR BHA. RIH ON 3.5" DP. CUT/SLIP DL. CONTINUE RIH W/ SPEAR BHA ON 3.5" DP. *BOTH CREWS HELD H2S DRILLS PRIOR T/MILLING PKER. THE RESULTS OF THE DRILL WAS REVIEWED W/EA. DRILLER & TOOLPUSHER. R£CEIVJ D NOV :50 1994, oil & Gas GoDs. Gommission Anchora~..~? WELL : DS 16-23 OPERATION: RIG : DOYON 16 PAGE: 4 09/15/94 (9) TD:11995 PB:11898 09/16/94 (10) TD:11995 PB:11898 09/17/94 (11) TD:11995 PB:11898 RIH W/BHA #10 MW: 9.0 NaC1/Br CON'T RIH W/BHA #8/3" SPEAR. OVER FISH @ 0700 HRS. SPEAR INSIDE STUCK SEAL ASSY. PKR OR SEALS WOULD NOT PULL W/130 K OVERPULL. JAR ON FISH W/80K OVERPULL. SAME RESULT. LOST 400 PSI PRESS INDICATING SPEAR PARTED F/BHA. POOH. BHA PARTED DIRECTLY ABOVE SPEAR. THIS LEAVES A 2.12 X 3" SPEAR INSIDE THE SEAL ASSY. MU BHA #9. RIH IN AN ATTEMPT T/COMPLETE BURNOVER OF THE PKR & WASH OVER SEAL BORE EXTENSION. MILL OUT EXTENSION & TAIL PIPE. MU KELLY. TAG PKR @ 11581. BURN OVER PKR T/11582. STILL NO INDICATION OF PKR FALLING DOWN HOLE. 30' OF FILL ABOVE TBG TAIL MAY BE HOLDING PKR BACK F/FALLING DOWN HOLE & MAY BE THE REASON WHY THE PKR DIDN'T RELEASE ON 1ST ATTEMPT. POOH W/BHA #9. MILL WAS 100% WORN. MU BHA #10. RIH T/COMPLETE WASHOVER AS ABOVE. POOH W/FISH MW: 9.0 NaC1/Br CON'T RIH W/BHA #10 & BURN OVER PKR. TAG @ 11582. REV. CIRC T/BU. MU KELLY BURN OVER PKR F/11582 T/11582.5'. APPEARS T/HAVE BROKE THRU PKR. WASH OVER PKR & TAIL PIPE ASSY T/11652 UNTIL TAGGING. WASH & REAM HARD SAND LAYING ON LOW SIDE OF HOLE T/11662. POOH T/11632. CBU WHILE RECIP. STOP CIRC. RIH & TAG @ 11662. POOH W/BURNING OVER SHOE. LD BAH #10. MU #11 & RIH T/2216. SLIP/CUT DL. RIH T/11558 & WASH OVER PKR @11880. APPEARS THAT PKR FELL DOWN HOLE? MONITOR WELL. POOH. HOLE IS TAKING +/- 8BPH WHILE POOH. RUNNING USIT CSG INSPECTION LG MW: 9.0 NaC1/Br LD FISH (PKR & TAIL PIPE ASSY). LD FISHING ASSY. MU REVERSING BASKET AND CSG SCRAPER BHA. RIH. SOFT TAG SAND/JUNK AT 11743'. HARD TAG SAND AT 11760'. REVERSE CIRC AND WASH DOWN TO 11763'. 27' ABOVE PERFS. LOSING 1-2 BPM WHILE REVERSING AT 60-80 SPM. POH. LD REVERSING BASKET, SCRAPER, COLLARS AND JARS. TEST BOPE. MU BAKER TEST PKR. RIH. TEST UP FROM 7680'. FOUND GOOD TEST ABOVE 7134' TEST FOR 3500 PSI FOR 30 MIN. DROP 2" RABBIT. POH. RECEIVED NOV ~0 1994 Oil & Gas Cons. Commission Anchora~:~ WELL : DS 16-23 OPERATION: RIG : DOYON 16 PAGE: 5 09/18/94 (12) TD:11995 PB:11898 09/19/94 (13) TD:11995 PB:11898 09/20/94 (14) TD:11995 PB:11898 CMTG 5-1/2" SCAB LINER. MW: 9.0 NaCl/Br CONTINUE POH W/TEST PACKER. RECOVER 2" RABBIT. RU SCHLUMBERGER TO RUN USIT LOG. RUN USIT LOG. LOG SHOWS COLLAR LEAK AT 7150' MD. VERY GOOD CASING ABOVE THIS COLLAR. SEVERLY CORRODED CSG BELOW THAT POINT. MAX LOGGING DEPTH WAS 8500'. CSG CONDITION IMPROVING WITH DEPTH. RU CSG EQUIP. RUN 5-1/2" SCAB LINER. LINER BTM WILL BE AT 11600'. LINER TOP WILL BE AT 6847'. LAST STAND IN LINER WAS TAKING +- 10K LBS. RU CIRC LINER VOLUME AT LAST JT OF LINER. CONTINUE RIH W/5-1/2" L-80 LINER ON 3-1/2" DP TO 11600'. MU CEMENT HEAD. CIRC 30 BBLS. SET LOWER LINER HANGER/PACKER. LOSING 3 BPM WHILE CIRC CIRC 30 BBLS. VERY LITTLE FLUID LOSS AFTER LOWER PACKER SET. PUMP 5 BBLS WATER, TEST LINES TO 4500 PSI. PUMPING CMT AT REPORT TIME. CLEAN OUT RUN MW: 9.0 NaC1/Br FINISH CMTG 5-1/2" LINER. PUMPED 20 BBLS WATER W/CEMENTERS. FOLLOWED BY 63 BBLS LEAD CMT + 30 BBLS TAIL. KICKED OUT DRILL PIPE WIPER DART WITH 5 BBLS WATER. DISPLACE W/153 BBLS BRINE AT 5 BPM FROM RIG PUMPS. PLUG BUMPED. FLOATS HELD. CIP AT 0630. SET LINER HANGER WITH 3000 PSI. SET LINER TO PPACKER WITH 4200 PSI. SHEAR OUT OF "HR" SETTING SLEAVE W/4200 PSI. PU 14' REVERSE OUT. CMT RETURNS TO SURFACE AT BOTTOMS UP. LD CMT HEAD. POH W/3-1/2" DP. LD 136 JTS 3-1/2" DP AND LINER RUNNING TOOL. RU TO PU CLEAN OUT BHA AND 2-7/8" DP. PU AND RIH W/138 JTS OF 2-7/8" DP AND BHA #13. CROSS OVER TO 3-1/2" DP AND CONTINUE RIH. TAG LINER TOP AT 6849'. MU KELLY. WASH DOWN TO 6913'. STAND BACK KELLY. CONTINUE TO RIH W/3-1/2" DP. TAG CMT STRINGERS AT 11357' (156' ABOVE LANDING COLLAR). MU KELLY AND DRILL STRINGERS DOWN TO +- 11425'. HARD CMT TO LANDING COLLAR AT 11505'. POOH LD DP MW: 8.6 Seawater CON'T DRLG CMT F/5.5" FLT EQUIP & CMT FILLED WL GUIDE INTO 7-5/8" CSG. WASH DOWN T/11616. CBU @ 11616 @ 46 SPM & 3000 PSI. NO GAS UNDER SHOE. POOH W/STC ECONO MILL. MILL IS IN GOOD SHAPE. RIH W/BHA #14 T/CLN OUT 3' OF SAND & ANY REMAINING DEBRIS F/SCAB LINER CLN OUT. SLIP/CUT DL. CON'T RIH W/BHA #14. MU KELLY & TAG SAND @11763. DROP BALL F/REV. BSKT. WASH & CLN OUT T/11769. NO FLD. LOSS. DISPLACE WELL W/CLEAN INHBTD SEH20. POOH LD DP. REd£1VED NOV 30 1994 oil & Gas Cons. Commission Anchom.~.~ WELL : DS 16-23 OPERATION: RIG : DOYON 16 PAGE: 6 09/21/94 (15) TD:11995 PB:11898 09/22/94 (16) TD:11995 PB:11898 LAND TBG MW: 8.6 Seawater CONTINUE POOH LAYING DOWN 3.5" & 2-7/8" DP. LAY DOWN BHA #14. PULL WEAR RING RU T/RUN L-80 COMPLETTION. HELD SFTY MTG. RUN COMPLETION, 144 JTS 2-7/8", 6.5# EUE 8 RD MOD & 213 JTS OF 3.5", 9.2#, NSCT. NO PROBLEMS GOING THROUGH LINER TOP W/PRODUCTION PKR. HOOK UP CL T/SSSV & TEST T/5000 PSI. LAND TBG @0600 HRS. RIG RELEASED MW: 8.6 Seawater RUN COMP STRING. MU HNGR & CL'S. TEST T/5000. LAND TBG RNLDS LD LNDG JT. RU SL & RIH T/SET XXN PLUG @11576. RIH & SET SSV HOLD OPEN SLEEVE @2261. LD TOOLS. SET PKR W/5000. TEST TBG T/4000/30 MIN. RD LNG JT. &^ CL'S. LD TBG. SET BPV. ND BOPE. NU ADPTR FLNG. & CL'S. TEST T/5000. NU TREE. PULL BPV. INSTALL TEST PLUG & TEST TREE T/5000. PRESS TBG T/1500. ANNUL T/3500/30 MIN. RELEASE. PRESS ANNUL. T/3300. SHEAR RP. PUMP 3612 GAL DIESEL T/ANNUL & U-TUBE T/ TBG. SET BPV. MOVE RIG OFF WELL. PU MATS & CLEAN UP. RELEASE RIG @ 03:00 HOURS ON 9/22/94. SIGNATURE: (drilling superintendent) DATE: RECEIVED NOV 5 0 1994 Oil & Gas Cons. Commission Anchora~., ~ • 9/26/94 Schiumberger NO. 8957 GeoQuest 500 W. International Airport Road Company: Alaska Oil & Gas Cons Comm Anchorage, AK 99518- 1199 ( Attn: Larry Grant Ate Sherrie 1 3001 Porcupine Drive Anchorage, AK 99501 \ qo- 0- 679- 1 ti)-9 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar D.S. 4-48 (' L b 1 USIT (9- 18 -94) 1 1 0 - D.S. 4.48 _� 1 I v CBT (9- 18 -94) 1 1 D.V. /, / f USIT- CORROSION (9- 17 -94) 1 1 D.S. 16 -23 �' () ( USIT- CEMENT (9- 17 -94) 1 1 4 o ct% / °i 0 `' � _Ma I`99 O I SIGN • . � 1 D ATE: Please sign and r = m one opy of this transmittal to Sherrie at the above address. Thank you. MEMORANDUM TO: THRU: State of Alaska Alaska Oil and Gas Conservation COmmission DATE: September 7, 1994 Blair Wondzell, ¢~(8-~ P. I. Supervisor FROM: Bobby Fo§te SUBJECT: Petroleum In~lSectSr FILE NO:' AFIIIGBD.doc BOPE Test - DOYON 16 ARCO - PBU - DS16-23 PTD # 90-0062 Prudhoe Bay Field Wednesday, September 7, 1994: I traveled this date to ARCO's DS 16-23 and witnessed the BOPE test on Doyon rig 16. As the attached AOGCC BOPE Test Report shows there was one failure. A flange leaked on the stack. This was tightened and retested. The tubing hanger packing leaked during the entire test, so all flanges and valves were visually checked for leaks and none were found. Everett Potter, ARCO rep., told me that when the tubing was out of the hole and a test plug could be run, a complete test would be performed. The lower pipe rams and the 3.5" kelly would be picked up and also tested. The rig was clean and all equipment seemed to be in good working order. The location was clean and good access to the rig was OK. Summary: I witnessed the BOPE test on Doyon rig 16 - test time 3 hours - 1 failure. Attachment:AFIIIGBD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: 7 5/8 Test: Initial X Workover: X DOYON Rig No. 16 PTD # ARCO Rep.: DS16-23 Rig Rep.: Set @ 11,995 Location: Sec. Weekly Other 90-0062 DATE: 9/7/94 Rig P 659-4610 / 11 EVERETT PO TTER WA YNE S TO TTS 24 T. 1ON R. 14E Meridian UM Test MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) Reserve Pit N/A Well Sign OK Drl. Rig OK BOP STACK: Quan. Annular Preventer 1 Pipe Rams Lower Pipe Rams Blind Rams 1 Choke Ln. Valves 1 HCR Valves 2 Kilt Line Valves 1 Check Valve N lA Test Pressure P/F 300/3,000 P 500/5,000 P Note 500/5,000 500/5,000 500/5,000 P P P P MUD SYSTEM: Visual Alarm Trip Tank YES YES Pit Level Indicators YES YES Flow Indicator YES YES Meth Gas Detector YES YES H2S Gas Detector YES YES FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Quan. Pressure Note P/F Note 500/5,000 P 500/5,000 P CHOKE MANIFOLD: No. Valves 14 No. Flanges 38 Manual Chokes 1 Hydraulic Chokes I Test Pressure P/F 500/5,000 P 500/5,000 P Functioned Functioned P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure 0 System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 6 @ 2200 3,050 P 1,700 P minutes 31 sec. minu~s 58 sec. YES Remote: YES Psig. Number of Failures: I ,Test Time: 3.0 Hours. Number of valves tested 22 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 if your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Failure: Flange leaked on the stack - tightened and tosted OK. The tubing hange~,leaked during the test ali breaks were manually checked- all valves were checked- no leaks found in equipment. BOPE will be re-tested when tubing is pulled out of hole. Note: The lower pipe rams and kelly will be tested after the tubing is pulled out of hole and a test p!ug can beused. Distribution: odg-Well File c - Oper./Rig c - Database c - Tdp Rpt File c - Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: BOBBY D. FOSTER FI-021L (Rev. 7/19) AFilIGBD.XLS ARCO Alaska, inc. Date: Subject: From/Location: Telephone: To/Location: June 21, 1994 ARCO Cased Hole Finals John E. DeGrey/ATO-1529 (907) 263-4310 Distribution Well Number 1-05ST -06 1-11 i Log Date i Tool Type !(M'D'Y)] i 6-13-94 i/'~¢ Dual Burst i 6-13-94 !r/ Dual Burst 6-14-94 1" Pen` Record i 1-25 i ! 1-29 { { 1-30 ! ! 3-02 ! i 3-19 f i 4-36 ¢ 4-41 5-11 9-15 9-18 9-25 i 11-35 i 11-36 f 13-31 { 13-35 i 14-03 14-03 16-23 16-23 17-02 18-02 18-04 18-19 i Run> Scale I t 5'! | ~ 5 ti ~ 1 ! 5II 1, 5" 1, 5" 1 5" 6-10-94 I / Perf Record 6-14-94 i'" Dual Burst 6-08-94 i/ CNL 6-07-94 i/ Tubing Cutter 6-05-94 i'/ Pen' Record 6-11-94 i''~ Perf Record 6-12-94 J,/'Cutter, Record 6-11-94 I / Dual Burst 6-13-94 t / Inj Prof 6-14-94 i / Inj Prof 6-i4-94 i / injProf 6-11-94 / Pen' Record 6-07-94 ~' Pen` Record 6-09-94 ~' Pen` Record 6-09-94 f Pen` Record 6-15-94 f Prod Log 6-15-94 ,~ Dual Burst · 6-13-94 / Leak Detection 6-10-94 ~ j Alpha Tubing 6-6-94 f Prod Prof 6-12-94 / Perf Record 6-12-94 /' Dual Burst 6-10-94 ,,-'Leak Detection I 5" I 5" 1 5" I 5" 1 5" 5II 5" 1 5" 1 5" 1 5" 1 5" 1 5" I 5" i 1 5" f 1, 1"&5" j 1, 1"&5" Contmctor Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch * The correct AP! # for 1-05ST is 50-029-20076-00 Number of Records: E. DoGroy Distribution: Central Files ANO-8 Geology Exxon Mobil · Phillips BPX State of Alaska ARCO Alaska, inc. Is a Subsidiary of AtlantJcRIchfleidCompany ARCO Alaska, Inc. P.O.Box 100360 'Anchorage, Alaska 99510 DATE: REFERENCE: '?~_~-~l-11 12-18-93 9~ ~__~L~I- 18 12-12-93 ~~-22 12-03-93 ~ 7-___~747_~__.1-25 12-17-93 ~T._~L~ - 6 12 -05-93 ~Z-/~G 2-22 10-22-93 · -~ ' 3-4 12 -20-93 ~3-36 12-11-93 ~0~-qZ. 4-1 12-06-93 ~__4-1 lA 12-13-93 ~.~2 ! ~__7__4-23A 12-14-93 ~* ?{.-~?~_4-31 12-11-93 , , .~ 4-41 12-14-93 :.,"~ -'i ! C' 5-28 12-10-93 '~ ~'~?~ __6-2 12-20-93 ~::~ ?'}~ 6-16 12-15-93 · ;'-.. ~C- -9-1 12-5-93 ~--. ~----Xx9-1 12-9-93 t-- ~?t 9-20 12-19~93 ~ ,__L~ z .... 9-29 12-13-93  -36A 12-17-93 -36A 12-17-93 ~]Z~tq'{ _9-51 12-07-93 ~~~____11-12 12-06-93 c~~l 1-13A 12-14-93 :~ ~--- _~:?_..14-1 12-5-93 ~-_~_ 5-9A 12-9-93 ~ -Z. Zo !6-17 12-4-93 ~ 6-23 12-10-93 C{~l 6-29A 12-18-93 1-3-94 ARCO CASED HOLE FINALS CNL (Ct~] 1 ~2.2.e---t o(~7/0 Run 1, 5" Leak Detect ]~. (~ ]T.o,~j qre~i~r' Run 1, 5" Pe~ Record ~ ~{C5ot3 ~ 1, 5" Prod Profile 159~t] I-k-~¥ ;~6 ~a~~ 1, 5" Peff Record ~9k~% -ilq~c ~ 1, 5" ~ (dep~ co~ected) ~ 1, 5' Inj Profile }~,,~ )~em~l~ce%~ ~ 1, a" Peff Record I ZcqO ~ [ZZ~ 0 ~ 1, 5" Peff Record ~O ~5~O ~ 1, 5" Peff Record ~ ~ o o - ~ ~ ~ 1, 5" Dual B~t ~T-P (~ ~ 1, 5" Prod Profile ~!?~ {~-¢.me.~'a~..? a.c ~ 1, 5" Perf Record c~qc-,t? -,~-:, "O ~ 1 5" Dual B~st ~T-P Prod Profile, Mak Detect,~ Sch Sch $ch Sch Sch Sch Sch Sch $ch Sch Sch Sch Sch Leak Detect/%'~'?'~ I-(*:'m ~ ;.~;(z5 i 1;( Rrm 1, 5" 5'~60 -;'l~z'~ Sch CNL} c~T& ~a3a ~qS' ~ z, 5" ' Sch Du~ Brat ~T-P/GR ,. , I~ 1, 5" "10(5O~qq q.~ Sch Prod Proflle~?,o I~O/~(~&gt0~ 1 l"&5" 0 ~ ~ { ~ Sch Prod Proflle/Se~q I'rt,mel ~lcr~ l, 5" q~5o- Io~q Sch ~G Cutter ~0 ~q~q ~ 1, 5" Sch GR/CCL(~R)q~O--q~¢O , ~ 1,5" Sch M~ Detection I~re5} ~.m~bca0 ~ 1,~&5"~--Ilk'he Sch Peff Record llg0o-iZllL ~ I, 5" Sch 10-19-93 TDTP (depth corrected) Run 1, 5" Please sign and return t~e attached cgpy ~ ~ceipt of dam. ECE VE r_ / John E. DeGrey APPROVED ATO- 1529 Trans# 94002, # PHILLIS # CENTRAL FILES # CHEVRON # BPX # STATE OF ALASKA # ANO8 GEOLOGY # EXXON # MOBIL The correct well name is 4-1 lA and the corrected API# is 50-029-20286-01 The correct well name is 4-31 and the corrected API# is 50-029-21334-00 The correct well name is 18-29A and the corrected API# is 50-029-22316-01 STATE OF ALASKA ALASK,a:-"'L AND GAS CONSERVATION REPORT UF SUNDRY WELL OPt:RATIONS 1. Operations performed: 2. Name of Operator ARCO Alaska, Inc. Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well , 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1624' FNL, 1249' FWL, Sec. 24, T10N, R15E, UM At top of productive interval 1264' FNL, 861' FEL, Sec. 25, T10N, R15E, UM At effective depth At total depth 1407' FNL, 780' FEL, Sec. 25, T10N, R15E, UM 12. Present well condition summary Total depth: measured true vertical 11995 feet 9178 feet Pedorate 5. Type of Well Development X Exploratory Stratigraphic ,,, 6. Datum of elevation(DF or KB) 70 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 16-23 9. Permit number/approval number 90-62 10. APl number 50 - 029-22050 11. Field/Pool Prudhoe Oil Pool Plugs(measured) Fill @ 11898' MD (5/25/92) feet Effective depth: measured 11898 feet true vertical 9114 feet Junk(measured) Casing Length Size Cemented Conductor 73' 20" 1775# Poleset Surface 3413' 10-3/4" 1000 sx CS III & 300 sx Cl G Production 11949' 7-5/8" 260 sx CIG Measured depth True vertical depth 110' 110' 3446' 3445' 11981' 9169' Perforation depth: measured 11790-11799'; 11802-11826' true vertical 9043-9049'; 9051-9067' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, IPCT @ 11681' MD REEEIVED DEC 1 6 1992 Alaska 0~1 & Gas Cons. Commission Anchorage Packers and SSSV (type and measured depth) Baker FB-1 packer @ 11580' MD; Otis 3-1/2" SSSV FMS @ 2224' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Reoresentative Daily Average Production or In!action Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 24 500 56 -- Subsequent to operation 224 ~ 998 295 -- Tubing Pressure 269 280 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X...~_ Gas_._ Suspended.__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed v Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE 928/13 KRF cc: SW, JWP 16-23 DESCRIPTION OF WORK COMPLETED FILL CLEANOUT & SOLVENT SQUEEZE STIMULATIONS 4127192: RIH & tagged top of fill at 11798' MD. 5125192: A Fill Cleanout & Solvent Squeeze Stimulation for paraffin removal, were performed as follows: MIRU CT & PT equipment to 4000 psi. RIH w/CT mounted jetting nozzle & jetted a proppant fill cleanout down to 11898' MD. POOH w/CT. Loaded wellbore w/150 bbls Crude, then RIH w/CT mounted Inflatable Packer & set at 11774' MD. Pumped a solvent treatment through the perforations below the packer at: 11790 - 11799' MD (Z4) 11802 - 11826' MD (Z4) Ref. Log: DIL 6/18/90. Pumped a total of 40 bbls Welchem A-Sol P-38 (solvent) in 3 stages, & diverted w/420 lbs of Dlverter in 6 bbls 40# Gel pumped in 2 stages. Squeezed fluids through the perforations and held 2000 psi for 15 minutes to soak the formation. Released & POOH w/Packer. Rigged down. Returned well to production following 12 hour soak. 10120192: A Solvent Stimulation for asphaltene removal was performed as follows: MIRU & PT equipment to 4000 psi. Pumped a fullbore Solvent Treatment through the perforations (listed above). Pumped 20 bbls Diesel spear @ 10 bpm, followed by 80 bbls Welchem A-Sol P-38 Cosolvent w/7 to 10 mesh ground rocksalt as diverter added at 1 ppg (3200 lbs total), followed by 105 bbls Diesel @ 5 bpm, followed by shutdown. Rigged down. Put well on production w/gaslift after formation soaked 24 hours, & obtained a valid welltest. Alaska 0it & Gas Cons, Anchorage ARCO Alaska, Inc. Post Office Bvx 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 April 1, 1991 Mr. W. D. McGee Regional Supervisor Northern Regional Office Alaska Dept. of Environmental Conservation 1001 Noble Street, Suite 350 Fairbanks, AK 99701 RE' Annulus Pumping - Notification of New Well Prudhoe Bay/Lisburne Permit 8740-DB002 Dear Mr. McGee: ARCO Alaska, Inc. on behalf of the Prudhoe Bay Unit owners, requests approval to utilize an additional annulus for the pumping of excess fluids from reserve pits and drilling operations. This material will consist primarily of drilling fluids, rig wash water and snow melt. Wells will be drilled, completed, and fluids pumped as outlined in the January 25, 1990 report. Approval is sought for the following well: DS 16-23 Attached is a well-specific summary sheet which indicates the surface hole location, anticipated pumping depths, and the requested start and stop dates for the well. Please note that this approval request is an extention of a well that was previously authorized for annular pumping but for which no fluids have been pumped. Your prompt attention to this matter would be appreciated. If you have any questions concerning this submission, please contact me at 265-1547. David W. Hanson Permit Coordinator Prudhoe Bay/Lisburne Attachment cc' L. Smith, AOGCC, Anchorage ECEIVED ,¢~;aska 0.~i .& Gas Cons, ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B-6003-C Annulus Pumping - .,11 Summary List Prudhoe Bay/Lisburne 4/1/91 DS 16-23 Approximate Surface Location: 1624' FNL, 1249' FWL, Sec. 24, T10N, R15E, UM Beginning pumping depth: Ending pumping depth: Anticipated start: Anticipated stop: Estimated Volume' Cumulative Volume Pumped to Date: 3445' TVD 6750' TVD May 20, 1991 May 20, 1992 35,OOO BBLS 0 BBLS STATE Of ALASKA REPOk f SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Perforate ,, Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1624' FNL, 1249' FWL, Sec. 24, T10N, R15E, UM At top of productive interval 1264' FNL, 861' FEL, Sec. 25, T10N, R15E, UM At effective depth At total depth 1407' FNL, 780' FEL, Sec. 25, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 70 RKB 7. Unit or Property Prudhoe Bay Unit 8, Well number 16-23 9. Permit number/approval number 90-62/90 -684 10. APl number 50 - 029-22050 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured 11995 feet Plugs(measured) true vertical 9178 feet Effective depth: measured 11898 feet true vertical 9114 feet Junk(measured) Casing Length Size Cemented Conductor 73' 20" 1775# Poleset Surface 3413' 10-3/4" 1000 sx CS III & 300 sx CI 'G' Production 11949' 7-5/8" 260 sx CI 'G' Measured depth 110' fd3445' 11981' True vertical depth 110' 3445' 9169' Perforation depth: measured 11790-11799'; 11802-11826' true vertical 9043-9049'; 9051-9067' RECEIVED O EC 1 9 Alaska Oil & Gas Cons, Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, IPCT @ 11681' MD 'Anchorage Packers and SSSV (type and measured depth) Baker FB-1 packer @ 11580' MD; Otis 3-1/2" SSSV FMX @ 2224' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 487 411 21 -- 1814 171 224 Tubing Pressure 262 248 15. Attachments Copies of Logs and Surveys run .,, Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 592 GB c: J. Gruber, ATO-1478 SH DS 16-23 FRACTURE TREATMENT OF ZONE 4 DESCRIPTION OF WORK COMPLETED 10/5/90- Replaced LGLV's w/DGLV's. 10/8/90' MIRU, & PT equipment to 8500 psi. Pumped a non reactive perforation breakdown treatment, followed by a propped fracture treatment, through perforations at: 11790 - 11799' MD Ref. Log' DIL 6/18/90. 11802 - 11826' MD Pumped the breakdown treatment as follows: a) 155 bbls 20# Gel, w/200 ball sealers, @ 10 bpm, followed by b) 125 bbls Seawater Flush, @ 10 bpm, followed by c) Shutdown. ISIP @ 2570. Surged the well twice, then pumped the fracture treatment as follows: d) 125 bbls 40# Gelled Pre Pad, @ 25 bpm, followed by e) 900 bbls 40# Cross Linked Water Pad, @ 25 bpm, followed by f) 293 bbls Slurry w/proppant concentrations of 2 to 12 ppg, followed by g) 22 bbls Flush, @ 21 bpm, followed by h) Shutdown, due to screenout. Placed a total of 41,250 lbs of proppant into the formation. Rigged down. 10/10/90 - 11/9/90' Performed carbolite fill cleanout , replaced DGLV's w/LGLV's, and intermittently produced the well. I 1/1 1/90' Performed a scale inhibition treatment. Returned well to full time production and obtained a valid production test. RECEIVED Anchorage ARCO ALASKA, INC F'. O. BOX ANCHORAGE, ALASKA )])ATE ' 9-28-90 995 ~ ~ REFERENCE' ARCO CASED HOLE FINALS { - { 0 9-5-90 i--26 9-5-9(') ,.°-'~.-_ o_~_9,3, ., --., _.m ~i 2-~ .S 9-6--9¢, 2-::..? ~ o ..... .:-.._o,-:., ~ :' %.~ z' ..., ::2 - 2 8 9 - 5 - 9 0 .~- ~'-' -'~ ~.. 9"-7-90 <'-... ~ -,~' 9-7-90 i 6--2~ 9-4-90 STATIC TEMF' STATIC T E i',it:' INJECTION PROFILE iNJECTION F'ROFILE PRODUCTION F'F:.OF I LE INJECTION PROFILE PRODLICTION F'ROFILE F'RODUCTION PROFILE F'RODUCTION PROFILE F'RODUCTION PROFILE PLEASE SIGN" AND RETLIRN THE ATTACHED COF'Y RECEIVED BY _~ ~ HAVE A NICE DAY! ALLY HOFFECKER ATO- i 529 RUN i, RUN i, RUN i , RUN i, RUN i, RUN i, RUN i, RUN i, RUN i, RUN I, AS RECEIF'T OF DATA, '.5 5 [:ANCO C: A M C 0 C A ?i C 0 ""..~ A M C C.. · ..; z~ ~'i C O C ~::~ ~ C 0 C ~q H C 0 C A a C 0 C A ~.i C 0 DISTRIBUTION CENTRAL FILES CHEVRON D & M E. xTEt.$ ION ExFLDRATION EXXON MARATHON MOBIL .~. PHILLJ:PS F'B UELL FILES BPX STATE OF ALASKA .TEXACO RFCFIVED o('r o 1 1990 ~la~ ~,, 4 ,.~as COILS. Anchorage A N C: t"! 0 R A 6;. E, A i... A ,:? K A 9 9'"!; 'i ;.") J:;..' iii: F' ii!: F;,' t_:i: in! C: E ' A R C 0 D :I: 1:;,' E C T I 0 N A I... i) A T A F:' I... E A,S E ,S 16 N A N D F;.'. E 'T' U R N "f' H E A T 'T' A C i'.i Iii, D C 0 P Y A ,':.' i:;.' E C Ii: il; F:' "f' 0 F:' D A 'T' A ,. RECEIVED BY ...~ ...... ~ J-i A V l::: A N i C E D A Y ! C E N T F;..' A i... F: :I: t... t'::,':.';' C: l"! E ",.," I:;.: O N D & H · 'il: iii: X 'i" E N $ :i: 0 N iii. X F:' I... 0 i:;..' A 'i" :t: 0 N E X X 0 N H A R A T H 0 N M O B :I: 1... ., f._ STATE OF ALASKA --., ~, ~-~ , ~-: ~ ALASK, AND GAS CONSERVATION IlS tON ;! APPLICA, ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate X Change approved program Pull tubing Variance Perforate Other 5. Type of Well Development X Exploratory Stratigraphic Service 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1624' FNL, 1249' FWL, Sec. 24, T10N, R15E, UM At top of productive interval 1264' FNL, 861' FEL, Sec. 25, T10N, R15E, UM At effective depth At total depth 1407' FNL, 780' FEL, Sec. 25, T10N, R15E, UM 6. Datum of elevation(DF or KB) 70 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 16-23 9. Permit number 90-62 10. APl number 50 - 029-22050 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 73' Surface 3413' Production 11949' 11995 feet Plugs(measured) 9178 feet 11898 feet 9114 feet Junk(measured) Size Cemented 20" 1775# Poleset 10-3/4" 1000 sx CS III & 300 sx CI 'G' 7-5/8" 260 sx CI 'G' Measured depth 110' 3445' 11981' True vertical depth 110' 3445' 9169' Perforation depth: measured 11790-11799'; 11802-11826' true vertical 9043-9049'; 9051-9067' RECEiVEg Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80, IPCT @ 11681' MD AUG ?- 9 1990 [iii & Gas Gons. Gornm~tss[Oa Packers and SSSV (type and measured depth) Baker FB-1 packer @ 11580' MD; Otis 3-1/2" SSSV FMX @ 2224' MD 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation 15. Status of well classification as: September 1990 16. If proposal was verbally approved Oil X. Gas Suspended Name of approver Date approved Service 17. I hereby.certify that the foregoing is true and correct to the best of my knowledge. Signed '~~ ~--'~ ~ Title Sr. Area Operations Engineer FOR COMMISSION H~I= ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10- ZI~; ~ I Approva, No? ._ Approved by order of the Commissioner Form 10-403 Rev 06/15/88 Approved Copy Returned __ ORIGINAL SIGNED BY C LONN[E C. SMITH omm,ss,oner SUBMIT IN TRIPLICATE .EIR C~B c: J. Gruber. ATO-1478 SH Drill Site 16-23 Zone 4 Hydraulic Fracture Treatment PRELIMINARY PROCEDURE Arco Alaska intends to pump a hydraulic fracture treatment on well 16-23 as outlined below: I , Pull gas lift valves and replace with dummy valves. Pressure test tubing / casing annulus. 2. Rig up fracturing service company. 3. Pump perforation breakdown treatment. . . . . Pump propped fracture treatment at 25 BPM, using a cross linked water system, with approximately 70,000 lbs of 16-20 proppant. The pump schedule is outlined as follows: A. 900 B. 20 C. 25 D. 45 E. 50 F. 55 G 25 Bbl pad Bbl @ 2 PPG proppant concentration Bbl @ 4 PPG proppant concentration Bbl @ 6 PPG proppant concentration Bbl @ 8 PPG proppant concentration Bbl @ 10 PPG proppant concentration Bbl @ 12 PPG proppant concentration If necessary rig up CTU and cleanout to PBTD. Install gas lift valves. Open well to flow gradually increasing the drawdown to allow proper fracture healing. RECEIVED 6 5 4 2 I I COILED TUBI, NG UNIT BOP EGU! PHENT 1. 5000 PSI ?" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PiPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC: SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS -6.5000 PSI 4 1/16" STUFFING BOX RECEIVED AUG 2 9 1990 ,---,. ~chorage td] REL ]NE BOP EOU ] PMENT 1. 5000 PSI '7" WELLHEAD CONN£CIOR FLANGE 2. 5000 PSI WlRELIN£ RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRIOATOR 4. 5000 PSI 4 1/6" FLOW TUBE PA:K-OFF STATE OF ALASKA ~; 'F~~' :~ ~, ~ AL~'~r(A OIL AND GAS CONSERVATION COMMISSION :;."'7 ~ a~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 Status of Well Classification of Service Well OIL ~ GAS r'~ SUSPENDED ~ ABANDONED [--] SERVICE 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 90-62 3 Address 8 APl Number P.O. Box 100360, Anchorage, AK 99510-0360 _~. 50-029-22050 4 Location of well at surface ~~ ['~,~~ - 9 Unit or Lease Name 1624' FNL, 1249' FWL, SEC 24, TION, R15E UM 1~.,~-~.,/,,~_ ~'~ VERIFICJ) PRUDHOE BAY UNIT At Top Producing Interval !~.~._.~ ~urf~..~ 10 Well Number 1264' FNL, 861' FEL, SEC 25, T10 N, R15E UM~ . ~,. H.~ 16-23 At Total Depth t ~..,.~, 11 Field and Pool 1407'FNL, 780'FEL, SEC 25, T10N, R15E UM PRUDHOE BAY FIELD 5 Elevation in feet (indicate KB, DF, etc.) J 6 Lease Designation and Serial No. PRUDHOE BAY OIL POOL RKB 70'J ADL 28333 12 Date Spudded06/03/90. 13 Date T.D. Reached06/16/90. ,14 07/09/90*Date Comp., Susp. or Aband. I 15 Water Depth, if offshoreN/A feet MSL 116 No. of Completionsl 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 19 Directional Survey 120 Depth where SSSV set J 21 Thickness of permafrost 11995' MD/9178' TVD 11898' MD/9114'TVD YES ~ NO r'-] 2224, feet MD 1900' (approx) 22 Type Electric or Other L(~gs Run DIFL/ZDL/CN/GR/SP, GCT, CET/CBT/GR 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO'I-I'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 SURF 110' 30" 1775 # POLESET 10-3/4" 45.5# J-55 SURF 3445' 13-1/2" 1000 SX CS Ill & 300 SX CLASS G TOP JOB WI 155 SX CS II 7-5/8" 29.7# L-80 SURF 11981' 9-7/8" 260 SX CLASS G 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number.)~.~_ ~ / 7~ SIZE DEPTH SET (MD) PACKER SET (MD) /¥c~9~ / ~".'/; 3-1/2" 11682' 11580'WLM 11790'-11799'MD/904~.'-9049'TVD ~ ~ W/2 SPF, 1800 PHASING 11802'-11826'MD/905'~'-9067'TVD~;~~ W/2 SPF, 180° PHASING 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC c, ( i,. ~.~? 5~ ~ ,z?-~'T DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ~ /.~ ~- .~ u~ -.'- N/A ' 27 N/A PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO I TEST PERIOD .~- FIowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ,,~ 28 CORE DATA Brief description of tithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED AUG 2 71990 gl.a . a.Ojl & Gas Cons. G ,mmissjgl3 *NOTE: DRILLED & TUBING RUN 6/22/90. PERFORATED WELL 7/9/90. Anch0raG Form 10-407 Submit in duplicate Rev. 7-1~80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS FORMA'FION TESTS NAME Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. TOP SADLEROCHIT 11777' 9034' HOT 11839' 9075' OWC 11884'-11890' 9105'-9109' NONE · · . 31. LIST OF ATTACHMENTS WELL HISTORY, ADDENDUM (SIGNED 8/6/90), & GYROSCOPIC SURVEY (2 COPIES) 32. I hereby certify that the foregoing is true and correct to the best of my knoWledge Signed (~ ~ ~ [~~l,~l.j Title DRILLING ANALYST Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1- Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced showing the data pertinent to such interval. ' Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ARCO · and Gas Company Well History - Initial Report- Daily Instructions: Prepare and submit the "lelllll Rtl~rt" on the tlrl~ Wednelday after a well is spudded or workover operations ere started, Daily work prior to SPudding should be summarized on the form giving inclusive dates only. District ARCO ALASKA INC. PRUDHOE BAY UNIT Auth. or W.O. n~S3609 Lease or Unit ADL: 28333 Title DRILL & COMPLETE IState AK API: 50-029-22050 Operator ARCO Spudded °r W'Os~ IDate 06/03/90 IH°ur Date and de'~th Complet ...... d f~A~ r~o~d aa of 8:00 a.m. 06/04/90 ( TD: 475'( SUPV:RJB 06/05/90 ( TD: 2925'( SUPV:RJB 06/06/90 ( TD: 3503'( SUPV:RJB 06/07/90 ( TD: 3503'( SUPV:MC 06/08/90 ( TD: 4685'( SUPV:MC 06/09/90 ( TD: 6093'( SUPV:MC 1) 475) 2) :450) 3) 578) 22:30 IARCO W.I. Prior status 21.0000 if a W.O. 4) 0) 5) .182) 6) 408) The above is correct $1gn~ ~ For form I~reparaflon and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. DRILLING 20"@ 110' MW: 8.6 VIS:300 MOVE RIG TO DS 16-23. ACCEPT RIG @ 1600 HRS 6/3/90. NU DIVERTER, TAKE ON WATER. M~ 13-1/2" BHA. FUNCTION TEST DIVERTER. SPUD @ 2230 HRS, 6/3/90. DRILL OUT ICE IN CONDUCTOR. DRILL TO 260', BIT PLUGGED. POOH, CLEAR JETS, RIH. DRILL TO 475'. DAILY:S60,930 CUM:$60,930 ETD:$125,000 EFC:$2,383,730 DRILLING 20"@ 110' MW: 9.1 VIS:200 DRILL TO 2519'. MWD TOOL FAILED. DRILL TO 2613'. WIR~LINE SURVEY. DRILL TO 2925'. DAILY:S51,255 CUM:$112,185 ETD:S250,000 EFC:$2,312,800 C & C BEFORE CMTG 10-3/4"@ 3445' MW: 9.1 VIS: 73 DRILLED TO 3503'. C&C. SHORT TRIP, HOLE TIGHT @ 2189', REAM F/ 2189'-2252'. C&C. POOH. RU CSG TOOLS, RUN 88 JTS 10-3/4", 45.5#, J-55, BTC CSG. TAGGED FILL @ 3430'. WASH CSG DOWN TO 3464', L/D PUP JT & (1) FULL JT OF CSG. LAND MANDREL CSG HGR, SHOE @ 3445' CBU PRIOR TO CEMENTING. DAILY:S52,357 CUM:$164,542 ETD:S312,000 EFC:$2,303,157 DRILLING SHOE JTS 10-3/4"@ 3445' MW: 8.7 VIS: 40 PUMP 90 BBL FRESH WATER, 1000 SX CSIII @ 12.2 PPG, 300 SX CL 'G' W/ 2% CACL @ 15.8 PPG. DROP TOP PLUG AND DISPLACE CMT, BUMP PLUG. PERFORM TOP JOB W/ 155 SX CS II @ 14.9 PPG. L/D LDG JT. N/D DIVERTER. N/U BOP. TEST BOPS. WHILE TSTG TEST JT PARTED, FISHED OUT TEST PLUG. M/U NEW TEST PLUG & FIN TSTG BOP. INSTALL WEAR BUSHING, P/U BHA. CHANGE KELLY BUSHING. SLIP & CUT DRILL LINE. RIH. TAGGED PLUGS @ 3365'. TEST CASING TO 2500 PSI FOR 30 MIN. DRILL OUT FLOAT COLLAR & SHOE JTS. DAILY:S225,794 CUM:$390,336 ETD:S640,000 EFC:$2,200,951 DRILLING 10-3/4"@ 3445' MW: 8.9 VIS: 39 CBU. RETEST CSG TO 2500 PSI FOR 15 MIN. DRILLED TO 3513'. CBU. PERFORMED LOT TO 14.7 PPG EMW. DRILLED TO 3604', MWD FAILED. POOH & CHANGE MWD TOOLS. RIH. DRILLED TO 3604', BEGIN KICKOFF. DRILLING & BUILDING ANGLE TO 4685'. DAILY:$53,850 CUM:$444,186 ETD:S720,000 EFC:$2,174,801 RIH 10-3/4"@ 3445' MW: 9.2 VIS: 42 DRILL TO 5858'..CHANGE SWAP ON PUMP %1. DRILL TO 6039'. CBU, DROP SURVEY, PUMP SLUG. POOH, CHANGE BIT, RIH. DAILY:S60,212 CUM:$504,398 ETD:S850,000 EFC:$2,105,013 IDate~ ,~ Iaumbai~t~J,X ~, they are p~E. for iPage no. AR3B-459-1-D ARCO and Gas Company Daily Well History--Interim Instrucllona: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed, Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "lnlerlm" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District ARCO ALASKA INC. ICounty or Parish NORTH SLOPE IState Field PRUDHOE BAY UNIT ILease or Unit DS 16-23 Date and depth Complete record as of 8:00 a.m. 06/10/90 ( TD: 7432'( SUPV:MC 06/11/90 ( TD: 8403'( SUPV:MC 06/12/90 ( TD: 9069'( SUPV:MC 06/13/90 ( TD: 9785'( SUPV:MC 06/14/90 ( TD:ll000'( SUPV:RJB 06/15/90 ( TD:ll013' ( SUPV:RJB 7) 1339) 8) 971) 9) 666) 10) 716) 11) 1215) 12) 13) 06/16/90 (13) TD:l1513' ( 500) SUPV:RJB 06/17/90 (14) TD:11995' ( 482) SUPV:RJB 06/18/90 (15) TD:11995' ( 0) SUPV:RJB f .... ~.~][~YoV~e d~,~i~ ..... k .... in prog .... DRILLING 10-3/4"@ 3445' MW: 9.3 VIS: 47 FIN RIH. REAM F/ 5989'-6039'. DRILL TO 7432'. AK IWell no. DAILY:S56,454 CUM:$560,852 ETD:S925,000 EFC:$2,086,467 DRILLING 10-3/4"@ 3445' MW: 9.4 VIS: 44 DRILL TO 7619'. CBU, DROP SURVEY, PUMP SLUG. POOH, CHANGE BIT, SERVICE WEAR BUSHING, RIH. REAM F/ 7556'-7619 AS PRECAUTION. DRILL TO 8403'. DAILY:S64,378 CUM:$625,230 ETD:S1,030,000 EFC:$2,045,845 DRILLING 10-3/4"@ 3445' MW: 9.5 VIS: 49 DRILL TO 8967'. CBU. POOH. P/U GR/RES/DIR MWD TOOL & PDC BIT. RIH. REAM F/ 8931'-8967'. DRILL TO 9069'. DAILY:S69,537 CUM:$694,767 ETD:S1,060,000 EFC:$2,085,382 DRILLING 10-3/4"@ 3445' MW: 9.6 VIS: 50 DRILL TO 9559'', DYNA DRILL FAILED. SERVICE MUD PUMPS. CBU. POOH. CHANGE OUT MOTOR & STABILZER. RIH, SLIP & CUT DRILL LINE, FIN RIH. DRILL TO 9785'. DAILY:S54,254 CUM:$749,021 ETD:S1,125,000 EFC:$2,074,636 DRILLING 10-3/4"@ 3445' MW: 9.7 VIS: 48 DRILLED F/ 9785'-11000' DAILY:S61,731 CUM:$810,752 ETD:S1,125,000 EFC:$2,136,367 REPAIRING BOP 10-3/4"@ 3445' MW: 9.6 VIS: 46 DRILL TO 11013'. CBU. POOH. ATTEMPT TO TEST BOP, NUMEROUS LEAKS. REPAIRING BOP LEAKS. DAILY:S53,343 CUM:$864,095 ETD:S1,125,000 EFC:$2,189,710 DRILLING 10-3/4"@ 3445' MW: 9.6 VIS: 51 FIN TESTING BOP, SET WEAR BUSHING. RIH, WASH & REAM F/ 10933-11013. DRILL TO 11513'. DAILY:S65,051 CUM:$929,146 ETD:S1,250,000 EFC:$2,129,761 POOH TO LOG 10-3/4"@ 3445' MW: 9.6 VIS: 49 DRILL TO 11721'. CBU. DRILL TO 11995' CBU. SHORT TRIP TO 11013'. PUMP HIGH / LOW VIS SWEEPS AROUND. POOH TO LOG. DAILY: $57,365 CUM: $986,511 ETD: $1,650,000 EFC: $1,787,126 R/D E-LINE 10-3/4"@ 3445' MW: 9.6 VIS: 51 FIN POOH. R/U ATLAS E-LINE. RIH W/ DIFL/ZDL/CN/GR/SP, COULD NOT GET PAST 10510'. POOH, R/D E-LINE. RIH W/ BIT. WIPE OUT LEDGES F/ 7286'-10734'. WASH & REAM F/ F90¥ ~995'-!!680'. POOH W/ The above is Correct Signature %..~ \\ \ \ ' OGS R'[DaLe'-LAS'/AT E LINE rTitle 1 - ' / For form prepa~'ation'<and distribution see Procedures Manual Section 10, Drilling, Pages 86 and 87 Drilling Sup!, AR3B-459-2-B INumber all daily well history forms consecutively JPage no. as they are prepared for each well. ARCO · ,nd Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforaling, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District ARCO ALASKA INC. [County or Parish NORTH SLOPE I Field PRUDHOF, [~A~ UN]ET [Lease or Unit DE ].b-9'5 I , . Date and deptl~ Complete record for ea~l~,~)~e ~,~l~g or workover in progress as of 8:00 a.m. IState AK IWell no. 06/19/90 ( TD:11995 PB: 0 SUPV:RJB 06/20/90 ( TD:11995 PB:11898 SUPV:RJB 06/21/90 ( TD:11995 PB:11898 SUPV:RJB 06/22/90 ( TD:11995 PB:11898 SUPV:MC L6) 17) 18) L9) DAILY:S54,920 CUM:$1,041,431 ETD:S1,675,000 EFC:$1,817,046 RNG 7-5/8" CSG 7-5/8"@11981' MW: 9.6 WBM FIN R/D E-LINE. RIH W/ BIT, SLIP & CUT DRILL LINE, FIN RIH. C&C. POOH. R/U TO RUN 7-5/8" CSG, INSTALLED 7-5/8" RAMS. RNG 7-5/8", 29.7#, L-80, BTC / BTC MOD CSG. DAILY:S130,429 CUM:$1,171,860 ETD:S1,687,000 EFC:$1,935,475 RUNNING GCT SURVEY 7-5/8"@11981' MW: 9.5 NaCl FIN RNG 281 JTS 7-5/8", 29.7#, L-80, BTC / BTC-MOD CSG TO 11981' C&C WHILE RECIPROCATING PIPE & BATCH MIXING CMT. BATCHED MIXED 260 SX B. J. TITAN "ARC" CMT @ 15.7 PPG. PUMP 50 BBL ARCO PREFLUSH FOLLOWED BY 79 BBLS CMT. DISPLACE CMT W/ 9.5 PPG BRINE. BUMP PLUG, RECIP PIPE DURING JOB, FLOATS HELD, FULL RTNS. L/D LANDING JT SET FMC PACKOFF & TEST TO 3800 PSI. CHANGE TOP RAMS TO 3-1/2" & TEST TO 5000 PSI. R/D CSG TOOLS. R/U SCHLUMBERGER, RUN GR/JB TO 11906'. RNG GCT GYRO SURVEY F/ PBTD TO SURFACE. DAILY:S365,628 CUM:$1,537,488 ETD:S2,000,000 EFC:$1,988,103 RIH W/ 3-1/2" COMPLETION 7-5/8"@11981' MW: 9.5 NaC1 FIN RNG GCT GYRO. N/D'FLOWLINE, N/U LUBRICATOR. RUN CET/CBT/GR @ 0 PSI & 1000 PSI, BOND EXCELLENT. FLOWLINE. PRESSURE TEST CASING TO 3500 PSI FOR 30 MIN. M/U PACKER ASSEMBLY. RIH ON E-LINE & SET PKR @ 11,580'. R/D SCHLUMBERGER. R/U TBG TOOLS. P/U SEAL ASSEMBLY & RIH W/ 3-1/2" COMPLETION. DAILY:S59,200 CUM:$1,596,688 ETD:S2,125,000 EFC:$1,922,303 RNG 3-1/2" COMPLETION 7-5/8"@11981' MW: 9.5 NaCl RIH W/ 3-1/2" COMPLETION, LOST PRESSURE ON CHEM INJ LINE. POOH W/ STRING. FOUND LEAK IN LINE @ GLM #10. L/D CHEM INJ MANDREL, LINE & CLAMPS. RIH W/ 3-1/2" COMPLETION W/O CHEM INJ SYSTEM. DAILY:S49,875 CUM:$1,646,563 ETD:S2,250,000 EFC:$1,847,178 The above is correct ,, r For form preparation and distribution see Procedures Manual Section 10. ,i,,, i~)ri!!tn~ Supt. Drilling, Pages 86 and 87 AR3B-459-2'B INumber all daily well history forms consecutively ]Page no. as they are prepared for each well. ARC' )iland Gas Company Daily Well History-Final Report · Instructions: Prepare and submit the "Final RepeAt" on th~ flret Wednesday after allowable has been assigned or well ia Plugged, Abandoned, or 6old. "Final Report" should be submitted also when operations ere suspended for an indefinite o¢ appreciable length of time, On workover~ when an official test la not required upon completion, report completion and representative test d&ta In blocks provided. The "Final RepeAt" form may be used for reporting the entire operation if space is available. I Aocounting cost center code District ICounty or Parish IState ARCO ALASKA INC. NORTH SLOPE AK Field ILease or Unit PRUDXOF. BAY UNIT ADL: 28333 ~ n~'6-23 Auth. or W.O. nOAs3609 ]Title DRILL & COH.~LETE ~PI: 50-029-22050 Operator ARCO 21. 0000 Spudded or W.O. begun SPUD Date and depth as of 8:00 a.m. IA.R.Co. W.I. Date Complete record for each day reported NABORS 28E 06/23/90 (~0) TD:11995 PB:11898 SUPV:MC 06/03/90 ot·l number of well· (active or inactive) on thisI ost center prior to plugging and ] bandonment of this well ] our22 30 Prior status If · W.O. RIG RELEASED 7-5/8"@11981' MW: 8.6 FSW FIN RIH W/ 3-1/2" COMPLETION. CIRC @ PKR, STING SEALS IN PKR, P/U & SPACED OUT TBG. M/U CONTROL LINE & HGR. TEST LINE TO 5000 PSI. DISPLACE WELL TO 8.6 PPG SEAWATER TREATED W/ C-193. FREEZE PROTECT W/ DIESEL TREATED W/ C-120. LAND TBG & TEST TBG TO 3500 PSI FOR 30 MIN. R/D TBG TOOLS. PRESURE UP ANNULUS TO 1000 PSI, ATTF24PT TO SHEAR OUT SHEAR OUT SUB W/ 4200 PSI, DID NOT SHEAR. SET BPV, N/D BOP, N/U TREE & TEST TO 5000 PSI. PULL TEST PLUG, SET BPV. SECUR~ WELL, RELEASED RIG @ 2230 HRS 6/22/90. NOTE: OTIS SSSV @ 2224', BAKER 'FB-i' PKR @ 11580'WLM, & TT @ 11682' DAILY:S286,556 CUM:$1,9933,119 ETD:S2,300,000 EFC:$2,083,734 Old TD New TD I PB Depth Released rig Date IKind of rig Classifications (oil, gas, etc.) I Type completion (single, dual, etc.) I Producing method IOfficial reservoir name(s) I Potential test data Well no. Date Reservoir Producing Interval OII or gee Test time Production OII on reit Gas per day Pu~np size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct 'i°"'~X,~j.~ ~.'-~:~-_ IDs'eX '"'~ ITM DrlllingSupt, For form beparltion Cd distribu;o., see Procedures Manual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C WELL HISTORY ADDENDUM WELL WORK LOG Well # 16-2,3 Work performed: INITIAL PERFORATIONS-ATTEMPT Cost: $8.221.50 AFE: AS3609 Date: 07/06/90 Time Summary 1 6 0 0- 0 0 3 0 Attempt to perforate. Work performed: INITIAL PERFORATIONS Cost: $11.000.00 AFE: AS3609 Date: 07/09/90 Time Summary 1100 1235 1450 1720 1830 MIRU Atlas. PT bop & lub RIH w/gun #1, w/ 2 spf, @ 180° phasing Shoot gun #1 f/ 11822'-11826', & 11790'-11799'. Shoot gun #2 f/ 11802'-11822'. ASF. RD ASF. RIH w/ gun #2. DkJ~E ~ SUB - S URFA CE DIRECTIONAL SURVEY ~-] UIDANCE ~] ONTINUOUS ~'] OOL Company ARCO ALASKA, INC. Well NameD.S. 16-23 (1624' FNL,1249' FWL,SEC 24,T10N,R15E,UM) Field/Location PRUDHOE BaY, NORTH SLOPE, ALASKA Job Reference No. 74023 Loqged By: PORTER SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. D.S. 16-23 PRUDHOE SAY NORTH SLOPE~ ALASKA SURVEY DATE: 20-JUN-lOgO ENGINEER: K. PORTER METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HDRIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 32 DEG II MIN EAST COMPUTATION DATE: 20-AUG-90 PAGE ARCO ALASKA, INC. D-S- 16-23 PRUOHOE BAY NORTH SLOPEr ALASKA DATE OF SURVEY: 20-JUN-1990 KELLY BUSHING ELEVATION: 70.00 FT ENGINIfER: K. PORTER INTERPOLATED VALUES FOR IfVifN 100 FEET OF MEASURED DEPTH TRUIf SUB-SEA COURSE MEASUREO VERTICAL VIfRTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG HIN DIfG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH frOST/WEST OISTo AZIMUTH FEET OifG/lO0 FEET FEET FEET DEG MIN 0.00 0.00 -70.00 0 0 N 0 0 E 100.00 99.99 29.99 0 12 S 41 26 W 200.00 200.00 130.00 0 7 S 58 42 E 300.00 300.00 230.00 0 6 S 72 20 W 400.00 400.00 330.00 0 10 S 34 17 E 500.00 500.00 430.00 0 4 N 32 34 E 600.00 600.00 530.00 0 25 N 66 2 E 700.00 699.99 629.99 0 4 N 69 20 E 800.00 800.00 730.00 0 9 N 25 23 E 900.00 900.00 830.00 0 17 N 83 50 E 0.00 0.00 0.00 N 0.00 0.04 0.00 0.23 S 0.28 W 0.29 0.21 0.55 S 0.33 0.27 0.01 0.52 S 0.31 0.50 0.24 0.80 S 0.33 W 0.55 0.31 0.79 S 0.22 W 0.66 0.28 0.67 S 0.19 E 0.58 0.56 0.38 S 0.49 0.65 0.45 0.23 S 0.86 0.66 0.19 0.15 S 1.00 0.00 N 0 0 E 0.36 S 50 43 W 0.64 S 30 46 W 0 . 60 S 31 4 W i~ 0.87 S 22 41 W 0.82 S 15 33 W 0.69 S 15 37 E 0.62 S 52 36 E 0.89 S 74 43 E 1.01 S 81 15 E 1000o00 1000.00 930.00 1100.00 1099.99 1029.99 1200.00 1199.99 1129.99 1300.00 1299.98 1229.98 1400.00 1400.00 1330.00 1500o00 1499.98 1429.98 1600.00 1599.97 1529.97 1700.00 1699.94 1629.94 1800.00 1799.92 1729.92 1900.00 1899.88 1829.88 0 3 N 18 48 E 0 14 N 71 48 If 0 8 N 52 45 If 0 28 S 79 53 If 0 53 S 47 27 If 0 42 S 54 41 E 0 55 S 50 39 E 0 54 S 59 51 E 1 32 S 57 29 E I 52 S 59 37 E 0.66 0.01 0.01 N 1.26 0.89 0.82 0.05 S 1.59 0.71 0.68 0.28 N 1.78 1.01 0.66 0.34 N 2.44 2.11 0.01 0.34 S 3.42 3.56 0.21 1.34 S 4.56 4.93 0.03 2.23 S 5.69 6.29 0.24 3.05 S 6.96 8.21 0.73 4.18 S 8.76 10.94 0.24 5.78 S 11.36 1.26 N 89 37 E 1.60 S 88 19 E 1.80 N 81 0 E 2.46 N 82 10 E 3.44 S 84 20 E 4.75 S 73 37 E 6.12 S 68 34 E 7.60 S 66 22 E 9.71 S 64 29 E 12.74 S 63 2 E 2000.00 1999.85 1929.85 2100.00 2099.80 2029.80 ZZO0.O0 2199.75 2129.75 2300.00 2299.70 2229.70 2400.00' 2399.66 2329.66 2500.00 2499.63 2429.63 2600.00 2599.60 2529.60 2700.00 2699.55 2629.55 2800.00 2799.49 2729.49 , 2900.00 2899.47 2829.~7 1 32 S 67 8 E I 34 S 83 40 E I 46 S 81 39 E 1 46 S 76 25 E 1 27 S 68 53 E 1 26 S 71 28 E I 47 S 64 26 E I 47 S 63 12 E I 39 S 66 53 E I 55 S 66 24 E 13.51 1.33 7.19 S 13.94 15.32 0.18 7.72 S 16.50 17.24 0.58 8.07 S 19.55 19.53 0.81 8.80 S 22.68 21.63 0.41 9.62 S 25.32 23.53 0.44 10.43 S 27.60 25.82 1.56 11.53 S 30.15 28.41 0.47 12.85 S 32.93 30.99 0.21 14.19 S 35.65 33.46 0.75 15.37 S 38.39 15.69 S 62 43 E 18.22 S 64 56 E 21.15 S 67 34 E 24.33 S 68 48 E 27.09 S 69 12 E 29.51 S 69 18 E 32.28 S 69 5 E 35.34 S 68 41 E 38.36 S 68 18 E 41.35 S 68 10 E 3000.00 2999.41 2929.41 3100.00 3099.33 3029.33 3200.00 3199.28 3129.28 3300.00 3299.24 3229.24 3400.00 3399.20 3329.20 3500.00 3499.18 3429.18 3600.00 3599.08 3529.08 3700.00 3698.93 3628.93 3800.00 3798.50 3728.50 3900.00 3897.42 3827.42 1 59 S 66 34 E 1 52 S 58 30 E 142 S 47 11 E 1 34 S 43 18 E 1 38 S 38 3 E 2 Z S 40 19 If 2 18 S 40 29 E 3 52 S 41 19 If 6 51 S 34 10 E 9 48 S 33 31 E 36.22 0.60 16.69 S 41.47 E 39.32 0.64 18.33 S 44.69 E 42.22 0.24 20.18 S 47.19 E 44.99 0.26 22.21 S 49.16 E 47.76 0.00 24.34 S 50.98 5 50.91 0.63 26.81 S 52.97 E 54.63 0.52 29.68 S 55.41 E 59.80 2.22 33.60 S 58.86 If 68.99 4.62 40.94 S 64.47 E 83.71 3.54 53.31 S 72.44 E 44.70 S 68 4 E 48.30 S 67 42 E 51.33 S 66 51 E 53.94 S 65 41 E 56.49 S 66 29 E 59.3T S 63 9 E 62.86 S 61 50 E 67.78 S 60 17 E 76.37 S 57 35 E 89.94 S 53 39 E COMPUTATION DATE: 20-AUG-90 PAGE 2 ARCO ALASKA, INC. O.S' 16-23 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 20-JUN-1990 KELLY BUSHING ELEVATION: 70.00 FT ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH OEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4000.00 3995.33 3925.33 13 24 4100.00 4091.93 4021.93 16 26 4200.00 4187.07 4117.07 19 4 4300.00 4281.33 4211.33 ZO 6 4400.00 4374.76 4304.76 21 35 4500.00 4467.12 4397.12 23 42 4600.00 4557.74 4487.74 26 14 4700.00 6666.65 4576.65 28 1 6800.00 4736.28 6664.28 29 34 4900.00 4820.86 4750.86 30 26 S 38 45 E S 37 20 E S 35 33 E S 34 4! E S 34 47 E S 37 13 E S 39 24 E S 39 48 E S 36 18 E S 33 18 E 103.86 2.83 129,48 3.32 160.10 1.48 193.59 1.12 229.09 2.00 267.45 2.57 309.33 2.62 354.71 1.77 402.53 2.59 452.55 1.53 69.58 S 84.42 E 109.40 S 50 30 E 89.81 S 100.39 E 134.70 S 48 11 E 114.55 S 118.55 E 164.86 S 45 59 E 142.01 S 137.81 E 197.88 S 44 8 E 171.25 S 157.98 E 232.99 S 42 42 E i)~ 202.35 S 180.59 E 271.21 S 41 45 E 235.42 S 206.68 E 313.27 S 41 17 E 270.50 S 236.11 E 359.06 S 41 7 E 308.32 S 265.81 E 407.08 S 40 46 E 369.51 S 294.26 E 456.89 S 40 6 E 5000.00 4906.42 4836.42 31 50 5100.00 4990.68 4920.68 33 22 5200.00 5073.17 5003.17 35 49 5300.00 5152.26 5082.26 39 35 5400.00 5227.10 5157.10 43 33 5500.00 5297.30 5227.30 47 11 5600.00 5362.82 5292.82 50 49 5700.00 5424.55 5354.55 52 31 5800.00 5485.47 5415.47 52 29 5900.00 5565.55 5675.55 53 35 S 31 30 E S 32 4 E S 34 19 E S 34 24 E S 34 50 E S 33 37 E S 33 47 E S 33 23 E 504.28 1.57 558.08 2.15 614.65 3.41 675.76 3.92 741.96 4.44 813.10 3.51 888.57 3.44 967.26 1.33 0.50 0.93 S 33 8 5 1046.50 S 33 11 E 1126.44 393.26 S 321.88 E 508.19 S 39 18 E 439.08 S 350.07 E 561.55 S 38 34 E 486.45 S 381.01 E 617.90 S 38 4 E 536.94 S 415.51 E 678.94 S 37 44 E 591.38 S 453.30 E 745.12 S 37 28 E 650.2Z S 493.35 E 816.20 S 37 11 E 713.06 S 535.21 E 891.57 S 36 53 E 778.61 S 578.79 E 970.17 S 36 38 E 864.92 S 622.18 E 1049.29 S 36 22 E 911.80 S 666.00 E 1129.13 S 36 9 E 6000.00 5604.63 5534.63 54 14 6100.00 5661.98 5591.98 55 38 6200.00 5718.09 5648.09 56 0 6300.00 5773.68 5703.68 56 35 6400.00 5827.97 5757.97 57 15 6500.00 5883.95 5813.95 54 45 6600.00 5942.58 5872.58 53 43 6700.00 6001.88 5931.88 53 32 6800.00 6061.38 5991.38 53 29 - 6900.00 6120.54 6050.54 53 57 S 32 29 E 1207.08 S 32 30 E 1289.06 S 33 17 E 1371.78 S 32 56 E 1454.91 S 32 32 E 1538.84 S 31 51 E 1621.73 S 31 7 E 1702.73 S 31 18 E 1783.24 S 32 I E 1863.60 S 32 36 E 1944.23 1.95 0.92 0.63 1.39 2.17 2.11 0.41 0.75 0.72 0.52 979.60 S 709.67 E 1209.65 S 35 55 E 1048.78 S 753.66 E 1291.49 S 35 42 E 1118.21 S 798.62 E 1374.1Z S 35 32 E 1187.84 S 864.07 E 1457.20 S 35 24 E 1258.47 S 889.41 E 1541.04 S 35 15 E '~! 1328.55 S 933.67 E 1623.82 S 35 6 E 1397.68 S 975.91 E 1704.67 S 34 55 E 1466.64 S 1017.49 E 1785.03 S 34 45 E 1535.02 S 1059.70 E 1865.27 S 34 37 E 1603.18 S 1102.78 E 1945.84 S 34 31 E 7000.00 6179.14 6109.14 54 18 7100.00 6237.13 6167.13 54 56 7200.00 6294.01 6224.01 55 41 7300.00 6350.06 6280.06 56 Z 7600.00 6406.80 6336.80 54 40 7500.00 6466.63 6394.63 54 50 7600.00 6522.06 6652.06 54 58 7700.00 6580.78 6510.78 53 0 7800.00 6641.21 6571.21 52 52 7900.00 6701.74 6631.74 52 42 S 32 55 E 2025.22 S 32 57 E 2106.69 S 32 53 E 2188.97 S 32 50 E 2271.79 S 32 29 E 2354.08 S 32 26 E 2435.65 S 32 27 E 2517.57 S 32 19 E 2598.47 S 32 28 E 2678.16 S 32 54 E 2757.80 0.54 I .07 0.62 0.71 1.01 0.42 0.59 0.84 0.21 0.37 1671.28 S 1146.62 E 2026.80 S 34 27 E 1739.67 S 1190.90 E 2108.25 S 34 24 E 1808.75 S 1235.62 E 2190.51 S 34 20 E 1878.32 S 1280.56 E 2273.31 S 34 17 E 1967.57 S 1325.02 E 2355.57 S 36 14 E 2016.45 S 1368.72 E 2437.10 S 34 10 E 2085.62 S 1412.61 E 2518.98 S 34 7 E 2153.94 S 1455.95 E 2599.85 S 34 3 E 2221.25 S 1¢98.60 E 2679.51 S 34 0 E 2288.30 S 1541.58 E 2759.13 S 33 58 E COMPUTATION DATE: 20-AUG-90 PAGE 3 ARCO ALASKA, INC. D.S. 16-23 PRUOHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 20-JUN-1990 KELLY BUSHING ELEVATION: 70.00 FT ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASUREO DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET DEG MIN 8000.00 6762.30 6692.30 52 42 8100.00 6822.80 6752.80 52 47 8200.00 6883.56 6813.56 52 33 8300.00 6944.21 6874.21 52 49 8400.00 7004.30 6934.30 53 22 8500.00 7063.58 6993.58 53 56 8600.00 7122.25 7052.25 54 19 8700.00 7190.60 7110.60 54 12 8800.00 7239.08 7169.08 54 12 8900.00 7297.94 7227.94 53 19 S 32 50 E 2837.33 S 32 0 E 2916.96 S 31 53 E 2996.39 S .32 13 E 3075.87 S 32 30 E 3155.81 S 32 35 E 3236.35 S 32 35 E 3317.30 S 32 2 E 3398.54 S 31 44 E 3479.63 S 31 11 E 3560.47 0.70 1.18 0.36 0.63 0.57 0.55 0.50 0.58 0.07 2 .lB 2355.06 S 1584.82 E 2838.65 S 33 56 E 2422.29 S 1627.49 E 2918.25 S 33 54 E 2489.74 S 1669.44 E 2997.64 S 33 51 E 2557.11 S 1711.60 E 3077.07 S 33 48 E 2624.62 S 1754.41 E 3156.99 S 33 46 E ~ 2692.54 S 1797.72 E 3237.52 S 33 44 E 2760.71 S 1841.38 E 3318.46 S 33 42 E 2829.37 S 1884.79 E 3399.67 S 33 40 E 2898.26 S '1927.57 E 3480.73 S 33 38 E 2967.18 S 1969.83 E 3561.52 S 33 35 E 9000.00 7358.48 7288.48 52 41 9100.00 7418.84 7348.84 53 7 9200.00 7478.52 7408.52 53 33 9300.00 7537.48 7467.48 54 6 9400.00 7595.88 7525.88 54 29 9500.00 7653.60 7583.60 54 51 9600.00 7711.69 7661.69 54 6 9700.00 7770.14 7700.14 54 23 9800.00 7829.02 7759.02 53 27 9900.00 7888.47 7818.47 53 34 30 30 E 3640.04 30 45 E 3719.74 31 0 E 3799.96 31 13 E 3880.67 31 28 E 3961.89 131 40 E 4043.52 31 23 E 4124.94 31 32 E 4206.08 31 1T E 4286.89 31 25 E 4367.30 0.22 0.63 0.55 0.44 0.51 0.72 0.42 0.61 0.51 0.17 3035.58 S 2010.52 E 3641.01 S 33 31 E 3104.21 S 2051.12 E 3720.65 S 33 27 E 3173.10 S 2092.26 E 3800.81 S 33 24 E 3242.22 S 7.133.98 E 3881.47 S 33 21 E 3311.59 S 2176.22 E 3962.65 S 33 19 E 3381.14 S 2218.97 E 4044.25 S 33 17 E 3450.55 S 2261.54 E 4125.63 S 33 14 E 3519.76 S 2303.89 E 4206.74 S 33 1Z E 3588.76 S 2345.99 E 4287.52 S 33 10 E 3657.42 S 2387.84 E 4367.90 S 33 8 E 10000.00 7947.68 7877.68 53 49 lOlO0.O0 8007.14 7937.14 52 54 10200.00 8067.41 7997.41 53 3 10300.00 8127.19 8057.19 53 27 10400.00 8186.63 8116.S3 53 39 10500.00 8245.75 8175.75 53 55 10600.00 8304.31 8234.31 54 21 10700.00 8362.4Z 8292.42 54 35 10800.00 8420.15 8350.15 54 53 ,,10900.00 8478.86 8408.86 52 28 S 31 46 E 4447.88 S 31 19 E 4528.26 S 31 21 E 4608.05 S 31 33 E 4688.22 S 31 49 E 4768.62 S 32 3 E 4849.28 S 32 16 E 4930.34 S 32 28 E 5011.69 S 32 50 E 5093.36 S 32 32 E 5174.26 0.40 1.05 0.56 0.31 0.57 0.40 0.15 0.43 0.46 3.86 3726.06 S 2430.06 E 4448.45 S 33 7 E 3794.49 S 2472.25 E 4528.81 S 33 5 E 3862.69 S 2513.68 E 4608.57 S 33 3 E 3931.08 S 2555.51 E 4688.72 S 33 2 E 3999.54 S 2597.69 E 4769.10 S 33 0 E 4067.99 S 2640.37 E 4849.75 S 32 59 E 4136.61 S 2693.50 E 4930.80 S 32 58 E 4205.34 S 2727.04 E 5012.14 S 32 58 E 4274.15 S 2771.03 E 5093.81 S 32 57 E 4342.11 S 2814.93 E 5174.72 S 32 57 E 11000.00 8541.29 8471.29 50 46 11100.00 8604.60 8534.60 50 52 11200.00 8667.40 8597.40 51 16 11300.00 8729.61 8659.61 51 42 11400.00 8791.36 8721.36 51 43 11500.00 8853.85 8783.85 50 53 11600.00 8917.71 8847.71 49 41 11700.00 8983.13 8913.13 48 34 11800.00 9049.57 8979.57 48 26 11900.00 9115.61 9045.61 48 46 S 32 3 E 5252.41 S 32 20 E 5329.83 S 32 21 E 5~07.65 S 32 15 E 5~85.91 S 31 57 E 5564.57 S 31 19 E 5642.67 S 30 44 E 5719.58 S 29 45 E 5795.08 S 29 31 E 5869.83 S 29 30 E 5944.B3 0.94 0.46 0.59 0.27 1.04 0.96 1.50 1.48 I .12 0.00 4408.35 S 2856.40 E 5252.86 S 32 56 E 4473.83 S 2897.70 E 5330.27 S 32 56 E 4539.55 S 2939.38 E 5408.09 S 32 55 E 4605.72 S 2981.17 E 5486.35 S 32 55 E 4672.29 S 3023.08 E 5565.00 S 32 54 E 4738.79 S 3064.04 E 5643.09 S 32 53 E 4804.73 S 3103.65 E 5719.97 S 32 52 E 4869.97 S 3141.72 E 5795.43 S 32 50 E 4935.15 S 3178.51 E 5870.15 S 32 47 E 5000.49 S 3215.49 E 5945.11 S 32 45 E COMPUTATION DATE: 20-AUG-g0 PAGE ARCO ALASKAt INC. D.S. 16-23 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 20-JUN-1990 KELLY BUSHING ELEVATION: 70.00 FT ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN IO0 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. OEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET DEG MIN 11995.00 9178.23 9108.23 48 46 S 29 30 E 6016.19 0.00 5062.67 S 3250.67 E 6016.44 S 32 42 E COMPUTATION DATE: 20-AUG-90 PAGE 5 ARCO ALASKAt INC. D.S. 16-23 PRUDHOE BAY NORTH SLOPEr ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG HIN DEG MIN DATE OF SURVEY: 20-JUN-1990 KELLY BUSHING ELEVATION= 70.00 FT ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG MIN 0.00 0.00 -70.00 0 0 1000.00 1000.00 930.00 0 3 200.0.00 1999.85 1929.85 1 32 3000.00 2999.41 2929.41 1 59 4000.00 3995.33 3925.33 13 24 5000.00 4906.42 4836.42 31 50 6000.00 5604.63 553¢.63 54 14 7000.00 6179.14 6109.14 54 18 8000.00 6762.30 6692.30 52 42 9000.00 7358.48 7288.48 52 41 N 0 0 E 0.00 N 18 48 E 0.66 S 67 8 E 13.51 S 66 34 E 36.22 S 38 45 E 103.86 S 31 30 E 504.28 S 32 29 E 1207.08 S 32 55 E 2025.32 S 32 50 E 2837.33 S 30 30 E 3,640.04 10000.00 7947.68 7877.68 53 49 11000.00 8541.29 8471.29 50 46 11995. O0 9178.23 9108.23 48 46 S 31 46 E 4447.138 S 32 3 E 5252.41 S 29 30 E 6016.19 0.00 0.01 1.33 0.60 2.83 I .57 1 0.54 0.70 0.22 0.00 N 0.00 E 0.00 N 0 0 E 0.01 N 1.26 E 1.26 N 89 37 E 7.19 S 13.94 E 15.69 S 62 43 E 16.69 S ~+1.4T E 44.70 S 68 4 E \ 69.58 S 84.42 E 109.40 S 50 30 E 393~26 S 321.88 E 508.19 S 39 18 E 979.60 S 709.67 E 1209.65 S 35 55 E 1671.28 $ 1146.62 E 2026.80 S 34 27 E 2355.06 S 1584.82 E 2.838.65 S 33 56 E 3035.58 $ 2010.52 E 3641.01 S 33 31 E 0.40 0.94 0.00 3726.06 S 2430.06 E 4448.45 S 33 7 E 4408.35 S 2856.40 E 5252.86 S 32 56 E 5062.67 S 3250.67 E 6016.44 S 32 42 E COMPUTATION DATE: 20-AUG-90 PAGE 6 ARCO ALASKA, INC. D.S. 16-23 PRUOHOE BAY NORTH SLOPE, ALASKA D6TE OF SURVEY: 20-JUN-1990 KELLT BUSHING ELEVATION: 70.00 FT ENGINEER: K. PORTER INTERPOLATEO VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN OEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 -70.00 0 0 N 0 0 E 70.00 70.00 0.00 0 10 S 49 21 W 170.00 170.00 100.00 0 14 S 11 11 E 270.01 270.00 200.00 0 4 N 30 0 W 370.00 370.00 300.00 0 13 S 11 38 E 470.00 470.00 400.00 0 6 N 37 51 E 569.99 570.00 500.00 0 20 N 74 24 E 670.00 670.00 600.00 0 9 N 29 30 E 770.00 770.00 700.00 0 16 N 60 20 E 870.01 870.00 800.00 0 3 S 34 22 E 0.00 0.00 0.00 N 0.00 E 0.02 0.16 0.15 S 0.21 W 0.21 0.24 0.48 S 0.37 W 0.30 0.23 0.53 S 0.27 W 0.40 0.23 0.71 S 0.37 W 0.57 0.01 0.83 S 0.24 W 0.62 0.0'7 0.7'3 S 0.00 E 0.61 0.00 0.43 S 0.46 E 0.67 0.38 0.31 $ 0.78 E 0.60 0.60 0.14 S 0.90 E 0.00 N 0 0 E 0.26 S 53 38 W 0.61 S 37 38 W 0.59 S 27 29 W 0.80 S 27 48 W ) 0.87 S 16 22 W 'r 0.73 S 0 21 E 0.63 S 4? 16 E 0.83 S 68 15 E 0.92 S 81 7 E 970.00 970.00 900.00 1070.02 1070.00 1000.00 1170.02 1170.00 1100.00 1270.02 1270.00 1200.00 1370.02 1370.00 1300.00 1470.02 1470.00 1400.00 1570.05 1570.00 1500.00 1670.04 1670.00 1600.00 1770.06 1770.00 1700.00 1870.12 1870.00 1800.00 0 7 N 35 14 E 0 16 S 79 41 E 0 12 N 12 10 E 0 30 N 84 24 E 0 48 S 48 51 E 0 54 S 51 0 E 0 56 S 48 54 E 0 49 S 60 50 E 1 21 S 56 52 E I 48 S 58 50 E 0.68 0.26 0.03 S 1.24 E 0.82 0.13 0.04 S 1.46 E 0.76 0.13 0.20 N 1.75 E 0.88 0.29 0.34 N 2.19 E 1.69 0.45 0.04 S 3.10 E 3.18 0.96 1.09 S 4.23 E 4.46 0.00 1.92 S 5.33 E 5.89 0.30 2.83 S 6.57 E 7.53 0.53 3.78 S 8.13 E 10.08 0.12 5.28 S 10.53 E 1.24 S 88 39 E 1.46 S 88 15 E 1.76 N 83 22 E 2.22 N 81 18 E 3.10 S 89 13 E 4.37 S 75 32 E 5.66 S 70 10 E 7.15 S 66 44 E 8.97 S 65 5 E 11.78 S 63 21 E 1970.16 1970.00 1900.00 Z070.19 2070.00 2000.00 2170.21 2170.00 2100.00 2270.30 2270.00 2200.00 2370.33' 2370.00 2300.00 2470.36 2470.00 2400.00 2570.39 2570.00 2500.00 2670.43 2670.00 2600.00 2770.48 2770.00 2700.00 2870.55 2870.00 2800.00 I 37 S 61 50 E I 31 S 81 36 E I 50 S 84 0 E I 53 S 75 56 E I 35 S 70 49 E 123 S 74 Z E 138 S 65 3 E I 46 S 64 13 E I 41 S 64 29 E I 43 S 65 48 E 12.81' 0.14 6.83 S 13.20 E 14.81 0.04 7.61 S 15.70 E 16.66 0.74 7.96 S 18.63 E 18.84 0.32 8.57 S 21.76 E 21.01 0.07 9.35 S 24.58 E 22.98 0.25 10.22 S 26.91 E 25.07 0.25 11.14 S 39.36 E 27.63 0.03 12.44 S 32.10 E 30.28 0.32 13.83 S 34.87 E 32.70 0.33 15.00 S 37.54 E 14.86 S 62 40 E 17.45 S 64 9 E 20.26 S 66 51 E 23.39 S 68 30 E 26.30 S 69 11 E 28.79 S 69 13 E 31.41 S 69 13 E 34.43 S 68 49 E 37.51 S 68 22 E 40.43 S 68 13 E 2970.58 2970.00 2900.00 3070.65 3070.00 3000.00 3170.70 3170.00 3100.00 3270.73 3270.00 3200.00 3370.78 3370.00 3300.00 3470.84 3470.00 3400.00 3570.91 3570.00 3500.00 3671.00 3670.00 3600.00 3771.32 3770.00 3700.00 3872.22 3870.00 3800.00 I 51 S 67 49 E 2 5 S 62 6 E I 42 S 52 14 E 1 35 S 44 23 E I 41 S 40 19 E I 59 S 39 59 E 2 13 S 40 44 E 3 20 S 61 50 E 5 53 S 36 0 E 9 0 S 32 42 E 35.42 0.43 16.31 S 40.56 E 38.44 1.27 17.84 S 43.82 E 41.39 0.63 19.62 S 46.54 E 44.21 0.38 21.64 S 48.60 E 46.92 0.93 23.69 S 50.45 E 49.88 1.16 Z6.0Z S 52.30 E 53.51 0.34 28.81 S 54.67 E 58.00 1.62 32.25 S 57.65 E 65.94 3.17 38.36 S 62.65 E 79.19 2.17 49.52 S 69.97 E 43.72 S 68 5 E 47.31 S 67 51 E 50.50 S 67 9 E 53.20 S 66 0 E 55.73 S 64 51 E 58.41 S 63 33 E 61.80 $ 62 13 E 66.06 S 60 47 E 73.46 S 58 31 E 85.72 S 54 43 E COMPUTATION DATE: 20-AUG-90 PAGE 7 ARCO ALASKAt INC. D.S. 16-23 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 20-JUN-1990 KELLY BUSHING ELEVATION: 70.00 FT ENGINEER: K. PORTER INTERPOLATEO VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET OEG MIN 3974.01 3970.00 3900.00 12 38 4077.15 4070.00 4000.00 15 42 4181.98 4170.00 4100.00 18 47 4287.98 4270.00 4200.00 19 58 4394.88 4370.00 4300.00 21 30 4503.14 4470.00 4400.00 23 46 4613.71 4570.00 4500.00 26 34 4726.53 4670.00 4600.00 28 22 4841.16 4770.00 4700.00 30 2 4957.21 4870.00 4800.00 31 14 S 37 42 E S 37 55 E S 35 46 E S 34 44 E S 34 43 E S 37 18 E S 39 43 E S 39 4 E S 34 45 E S 32 9 E 98.03 3.48 123.14 3.37 154.24 2.10 189.46 1.04 227.21 1.92 268.70 2.61 315.39 2.57 367.13 2.13 422.94 1.74 481.92 1.73 64.98 S 80.79 E 103.68 S 51 11 E 84.75 S 96.51 E 128.44 S 48 43 E 109.78 S 115.14 E 159.08 S 46 22 E 138.60 S 135.46 E 193.80 S 44 21 E 169.71 S 1.56.91 E 231.13 S 42 45 E 203.35 S 181.35 E 272.47 S 41 44 E 240.12 S 210.58 E 319.38 S 41 15 E 280.18 S 244.06 E 371.57 S 41 4 E 324.96 S 277.69 E 427.44 S 40 31 E 374.25 S 310.10 E 486.03 S 39 39 E 5075.27 4970.00 4900.00 32 55 5196.07 5070.00 5000.00 35 41 5323.18 5170.00 5100.00 40 28 5460.39 5270.00 5200.00 45 53 5611.33 5370.00 5300.00 51 13 5774.60 5470.00 5400.00 52 23 5941.20 5570.00 5500.00 53 37 6114.25 5670.00 5600.00 55 43 6293.35 5770.00 5700°00 ' 56 31 6475.64 5870.00 5800.00 55 17 S 31 42 E 544.55 S 34 17 E 612.34 S 34 38 E 690.61 S '34 6 E 784.43 S 33 47 E 897.32 S 33 7 E 1026.37 S 32 50 E 1159.58 S 32 36 E 1300.82 S 32 58 E 1449.36 S 32 7 E 1601.73 I .78 3.41 3.84 3.44 3.17 0.17 0.87 1.18 1.23 2.49 427.60 S 342.92 E 548.12 S 38 44 E 484.54 S 379.70 E 615.59 S 38 5 E 549.18 S 423.93 E 693.77 S 37 40 E 626.42 S 477.36 E 787.57 S 37 19 E 720.33 S 540.08 E 900.31 S 36 52 E 828.06 S 611.17 E 1029.18 S 36 26 E 939.59 S 684.08 E 1162.23 S 36 3 E 1058.68 S 759.99 E 1303.23 S 35 40 E 1183.19 S 841.05 E 1451.65 S 35 24 E 1311.59 S 923.08 E 1603.85 S 35 8 E 6646.27 5970.00 5900.00 53 39 6814.46 6070.00 6000.00 53 33 6984.33 6170.00 6100.00 54 13 7157.61 6270.00 6200.00 55 26 7335.60 6370.00 6300.00 55 44 7509.31 6470.00 6400.00 54 53 7682.00 6570.00 6500.00 53 19 7847.62 6670.00 6600.00 52 46 8012.71 6770.00 6700.00 52 42 8177.69 6870.00 6800.00 52 33 S 31 I E 1740.01 S 32 5 E 1875.21 S 32 53 E 2012.50 S 32 56 E 2154.04 S 32 46 E 2301.26 S 32 24 E 2443.25 S 32 20 E 2584.06 S 32 38 E 2716.12 S 32 45 E 2847.46 S 31 52 E 2978.71 0.42 0.82 0.50 0.58 1 0.52 2.02 0.5 T 0.81 O.ZO 1429.62 S 995.1~ E 1741.87 S 34 50 E 1544.86 S 1065.86 E 1876.87 S 34 36 E 1660.60 S 1139.T1 E 2014.08 S 34 28 E 1779.42 S 1216.66 E Z155.59 S 34 22 E 1903.10 S 1296.52 E 2302.77 S 34 16 E ~ 2022.86 S 1372.80 E 2444.70 S 34 10 E 2141.76 S 1448.23 E 2585.4~ S 3¢ 4 E 2253.26 S 1519.01 E 2717.45 S 33 59 E 2363.57 S 1590.30 E 2848.78 S 33 56 E 2474.73 S 1660.11 E 2979.97 S 33 51 E 8342.77 6970.00 6900.00 53 2 8510.91 7070.00 7000.00 53 58 8681.87 7170.00 7100.00 54 15 8852.74 7270.00 7200.00 54 3 9019.04 7370.00 7300.00 52 44 9185.64 7470.00 7400.00 53 29 9355.53 7570.00 7500.00 54 19 9528.44 7670.00 7600.00 54 41 9699.76 7770.00 7700.00 54 23 9868.86 7870.00 7800.00 53 35 S 32 23 E 3110.00 S 32 36 E 3245.16 S 32 8 E 3383.83 S 31 34 E 3522.40 S 30 31 E 3655.18 S 30 58 E 3788.41 S 31 22 E 3925.71 S 31 37 E 4066.75 S 31 32 E 4205.88 S 31 24 E 4342.24 0.57 0.49 0.58 0.96 0.32 0.51 0.47 0.98 0.60 0.38 2585.96 S 1729.83 E 3111.19 S 33 47 E 2699.96 S 1802.46 E 3246.33 S 33 44 E 2816.90 S 1876.98 E 3384.97 S 33 41 E 2934.68 S 1950.00 E 3523.47 S 33 36 E 3048.64 S 2018.22 E 3656.14 S 33 30 E 3163.19 S 2086.32 E 3789.27 S 33 24 E 3280.71 S 2157.36 E 3926.48 S 33 20 E 3400.92 S 2231.15 E ~067.47 S 33 16 E 3519.60 S 2303.79 E 4206.54 S 33 12 E 3636.04 S 2374.77 E 4342.85 S 33 9 E COMPUTATION DATE: 20-AUG-90 PAGE 8 ARCO ALASKAt INC. D.S. 16-23 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: ZO-JUN-1990 KELLY BUSHING ELEVATION: 70.00 FT ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SE~ DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 10037.79 7970.00 7900.00 53 45 10204.31 8070.00 8000.00 53 5 10371.94 8170.00 8100.00 53 33 10541.29 8270.00 8200.00 54 6 10713.08 8370.00 8300.00 54 36 10885.31 8470.00 8400.00 53 1 11045.33 8570.00 8500.00 50 39 11204.17 8670.00 8600.00 51 17 11365.42 8770.00 8700.00 51 59 11525.52 8870.00 8800.00 50 38 S 31 47 E 4478.38 S 31 22 E 4611.50 S 31 43 E 4746.04 S 32 7 E 4882.69 S 32 28 E 5022.37 S 32 44 E 5162.55 S 32 1~ E 5287.49 S 32 21 E 5410.90 S 32 12 E 5537.40 S :31 7 E 5662.44 0.81 0.54 0.44 0.55 0.52 4.05 0.17 0.69 0.77 1.31 3752.00 S 2446.12 E 4478.95 S 33 6 E 3865.64 S 2515.47 E ~,612.02 S 33 3 E 3980.34 S 25135.82 E 4746.53 S 33 I E 4096.30 S 2658.17. E 4883.16 S 32 59 E 4214.35 S 2732.77 E 5022.82 S 32 $8 E ~~ 4332.25 S 2808.61 E 5163.01 S 32 57 E 4438.04. S 2875.08 E 5287.93 S 32 56 E 4542.29 S 29~,1.1Z E 5411.34 S 32 55 E 4649.25 S 3008.67 E 5537.83 S 32 54 E 4755.70 S 3074.28 E 5662.85 S 32 53 E 11680.03 8970.00 8900.00 48 45 11830.84 9070.00 9000.00 48 37 11982.51 9170.00 9100.00 48 46 11995.00 9178.23 9108.23 48 46 S 29 59 E 5780.13 S 29 37 E 5392.90 S 29 30 E 6006.81 S 29 30 E 6016.19 1.17 0.71 0.00 0.00 4857.02 S 3134.25 E 5780.50 S 32 50 E 4955.24 S 31~9.90 E 5893.20 S 32 46 E 5054.50 S 3266.04 E 6007.06 S 32 43 E 5062.67 S 3250.67 E 6016.44 S 32 42 E COMPUTATION DATE: 20-AUG-90 PAGE 9 ARCO ALASKA,p INC. D-S- 16-23 PRUDHOE BAY NORTH SLOPE, ALASKA MARKER INTERPOLATED VALUES FOR CHOSEN HORIZONS DATE OF SURVEY: 20-JUN-1990 KELLY BUSHING ELEVATION: 70.00 FT ENGINEER: K. PORTER · SURFACE LOCATION = 1624' FNL E 1249' FWL, SECZ4 TION R15E MEASURED OEPTH BELOW KB TVD FROM KB SUB-SEA SHUBLIK 11729. O0 9002.40 TOP ~~ADL-~.-O~HIT 11777. O0 9034.30 ZONE 4 11777.00 9034.30 HOT 11839.00 9075.40 GCT LAST READING 11840.40 9076.32 OWC 11884.00 9105.06 OWC 11890.00 9109.02 PBTD 11898.00 9114.Z9 TD 11995.00 9178.23 8932.40 8964.30 8964.30 9005.40 9006.32 9035.06 9039.02 9044.29 9108.23 RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 488B.92 S 4920.17 S 4920.17 S 4960.57 S 4961.48 S 4990.02 S 4993.95 S 4999.19 S 5062.67 S 3152.46 E 3170.04 E 3170.04 E 3192.93 E 3193.42 E 3209.56 E 3211.79 E 3214.75 E 3250.67 E COMPUTATION DATE: gO-AUG-90 PAGE 10 ARCO ALASKA, INC. D.S. 16-23 PRUOHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: ZO-JUN-1990 KELLY BUSHING ELEVATION: 70.00 FT ENGINEER: K. PORTER ****~*****~ STRATIGRAPHIC SUMMARY SURFACE LOCATION = 1624' FNL & 1249' FWL, SEC24 TION R15E MARKER MEASURED DEPTH BELOW KB TVO FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST SHUBLIK ZONE 4 HOT OWC TOP OWC BOTTOM P~TD TO 11729.00 9002.40 8932.40 11777.00 9034.30 8964.30 11777.00 9034.30 ~964.30 11839.00 9075.40 9005.40 11884.00 9105.06 9035.06 11890.00 9109.02 9039.02 11898.00 9114.29 9044.29 11995.00 9178.23 9108.23 4888.92 S 4920.17 S 4920.17 S 4960.57 S 4990.02 S 4993.95 S 4999.19 S 5062.67 S 3152.46 E 3170.04 E 3170.04 E 319z. 93 E 3209.56 E 321 1.79 E 3214.75 E 3250.67 E FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 11995.00 9178.2:3 9108.23 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 6016.44 S 32 42 E SCHLUMBERGER 0 1 REC T I ONAL SURV E Y COMPANY ARCO ALASKA, INC. WELL O.S. 1 FI ELD PRUOHOE BAY COUNTRY USA RUN ONE DATE LOOOEO 20 - JUN - 90 REFERENCE ?4029 ~ELL: D.S. 16-23 (1624' FNL, 1249' FWL, bEC 24, T10N, R15E, UM) HORIZONTAL PROJECTION NORTH 2000 ~EF 74023 ] 000 - 1000 -2000 -9000 -4000 -SO00 8~U'rH -6000 EST SCALE = 1/!000 IN/FT -L~)O0 - ] 000 0 1000 2000 9000 4000 5000 GO00 WELL: (1624' D.So FNL , 16-33 1249' FWL,S'"C 24, T10N, R15E, UM) VERTICAL PROJECTION 9Z8. -4000 -2000 0 0 ZOO0 4000 6000 8000 !0000 ,2000 :!i:i'~' I'~'~'''~'''? ...... !--+-'?-i-'t++?-;-,-.+--+--!-~i--!,++-?~,''+'-i---+-~i-..l.+.i.-.~..q-.:-..~.-~--!~.!.-i--i~-..;~ ~ .......... ~-~--~..~ ..... t ......... ~ .... ~ ..... ~ ~ ~. ~ ~.~ ..... .-~..-~ ...... ~ ........ i...,..., ...... ~...; ..... ~ .... i...=..; ..... i..a...~..4. ~..i. ~ · · ~ I ; ~ ; - i . i ~ ' . I ~ . I ~ ' ;;~.~ ; ; ~; ; ; . ~ . ~ t~i : . . ':.. ii '. ...... ~ ....... l ......... ' ....... ' .... : ................................ · .. : .. : : ' ' ' ' ~ ' ~ ' ' ~ ' ' ' ~'~ / ' ' ' + - ........ ~ ...... ~ ..... :"?'l': "~ ': .... : ....... ~:"'~ ......... : ....................... ; ~ ' ' ~ ~i ~ I ~ ~ +'-+ ....... ~"'! ........... h'':' ';''~ ..... ~"+";"'~'"'"'~'"?'+ ~ ..... +"+"~'++'; ...... ~"? ........... ~': .... ! '~'''; .... :.-I ........ : ~'": ......... i: '-~' ~ ....... [ ..... ; ....... "'T'"T"'T'"7't"~"T'"T"~ .......... 7¢'"~";'";"';"~'":';'"~ ....... ~"~"~" ~"'~"~' ~'";;'"r"~ ;; ...... ;"': ..... ~", .... ~ ....... : ~.: ............ ~ .... i ............ : ...... · ....... ....... ....... LL;.-.¥.i...i ....... ;...; ...... ;..;...:..:...I...L'....L: ....... ; ....... ;...~...~...:...;..;...; ...... ;. ::.i...: ;..'-.:... -~itilt-?i..-~ ....... +--.?.-.i--.?-.~+.~---..-~---?--+.--?$-+++.~ ...... ?~-+.~...~..-~-.-i.--+-..i ...... +-.~..-~...~..I-..~.+~ .......... :...+..-, ....... {...~..;...;-.~ ....... :..:..,--?..{ ....... : ....... ; 'l ~ i i ~ T'¥T"T ....... ~ ...... T'T'T'T"T ....... ~ .... ~"~a~'"7"Y'; ....... , ........ ~"'; ....... fy'-'-'"? .... ; ....... ; .... 1'! ....... r ......... ~'"?"; ....... ~'"' ............... + .............................. ~ "T"¥T"¥T"YT"~ .......... ¥'~"'l"T'"l ...... ~'T"r-' ;'T"~'"f'l" I" ~'"¥'l"l ....... 7"T'"T ..... T' i"+"r'~ .... ~ .......... '"'!"-?~'"T ............... :'"~"';'"!'"i ...... ~'-', .......... *'","'i ..................... ~ .... ~ .......... "T"rT"T ....... r'T"T"'~ ....... r"r"??l'"l'"; ..... ?' '~"'r"~'"r"Cr"r'r": ....... r'r"r'r"f--f--f'+'.! ....... ~.--?-!...?..l--.~.--?.+-.~...~ ....... , ....... t..., ....... +.., ........... ,.-?..+-.t ....... +..,.-~ ...... ~ ....... ?L.¥.;..+.., .... .;i-.$--+--..-+..;...i.-~....-i...i-..;..4 ...... ;---:-.4-~ ...... ;. '.-~.-.~-.I...i...:..;-.~....-.i...~...i.-;. ---i.--L.L.;...'...L.i .; i -; i .L.L..4. i :. i ..... i.~ ~ ~ -; : i l- I-i L i~ ; ¢ ~-i : '- ' .... ....... ...... ~ ; : : , ; : : : 7 : : : . : : : : : · ; ~ ; ~ : , : ~ T : . : ~ I'"? ..... ??".'"?'~'".'"~"'r"? ""r" '"~ ...... r"?'?"?"-"?"-'~"- ..... ?r"?'. ...... r"?~ ..... ~'"*'--~ ........... ...~.......%...% ...... ~...%...%...~ ...... ~...%.......~...~...%...~..% ...... $...~...%...% .... ~...~. % ,. %...~..%...4...~..4...;...x...a : : ; : . · : : . . : : : : : ; . : ~ ' . ; . : ..i;..4...fI...,..~...:...~ ...... ~...;...:...q..~...~.~ ....... ~...:...~:~:~.~...:...:...:...~..:..~...~...: ..... ?-:-..,--.t..~'";"-¥.~ ....... ?.?..;.+-~..?~..-: .......... ~...?.,.¥..-;.--¥.; ...... ?.?....?..+..-,...: ..... +--~ ....... {:~4-i---¢-¢--- -4.-.,-+-;.--,.~,.-?--~-.~r~ ...... ~n~~':: ' -.+.4 ....;-q...~...;..¢...;~;~, ..... ~ +...;...~...;-,; ..i.i.: V~RW ~;7' ' ' .' ..:.. ;;'"7;;Zi"~,, ~.,~N ~'TV'-'"'E:~ J'"?2:};i;i2;E:,:. ZE$222, ..... ;1:1!2: · .4...;--.~...¢...L}...~.4...; ....... ~...~...;...;...k.;..~.-;-......~...;...;...;.+.4.¢.}...;> ~..lUm4.~...4.L.L....i..;...L..LL;...LLi ...... ;...L.LL.L~...L:...~ ....... ~.. L..!.~ ...... 1 Li. ~...~ ....... L!.L..~ ....... .-4.4...~..* ...... *...~..-~...;.....4-;...~...; .......... ~.¢ ...... ;...;..4...~ ...... ;; ;-; r' ¢;~ ~ * ~ L.. ~ * ~ ~ ~ ~ : ~ ~ ~ : ' ~ ~ ~ ~ ~ ~ ~ ~ ~ ' ' ~ : . ~ :. * * : : ~ ~ i ~ ~ : . ; ~ ~ ~ ~ { ~ ' : · ~ ~ · ~ : . : ~ ' ~ : . ""T"T"~"T"t'"T"?T"~ ...... T-*'"T"~ ...... F"T"~"r'"'"~'"~-T"~ ...... *'"* ....... 7 ....... ..-.*-.-?-,..1--?-.*---~..-.-- ...,...,...?, ...... ..-.,...,.-, ....... , ...... *--.*.-- ---~.........., ...... i.-., .... ,...~.. · '.......~...,..~...,... u..i...&..~-,.......;-g-.i...{ ...... *..4...*...~......*...,...~..;-...¥...4..., ....... &..g..4....~ ..~...,-g...g... "j'"~'"~'"~'"l"'f"?'f"f'-:"+";"!'"~'","~'";~'f ...... t ....... i'"f"f"i'"f"f"~ ....... +-'+-'i--'+'--f-'*'--;"'¥+. ~';-"~"~.-';'"~"';"-:'";-..; ....... ;...;...L.; ...... L-L.L..; ...... ;...L.L..;...L.L.L.:...; ...... 1...; ...... L.I .............. -T'T"~'"r" '"t'"!"'i'"i'", "'f"t-"f"f"~' 'i'";~'r"~ "'~t'"?t'"?"/"-""+-'i"+"?'t'+"!'"+'"~"-'~':--.1.~i..+-..-..~---;.-1...i..4.-i.-i--.;-.-;.-- .-.~-..~...:..~..-l---;..-;..~...; ...... ;..:...:...;...l.. ~i i"H::i'+'+-'?+'" :'+':ttti":?':~'+ ..... ?'i"'?i"++'+'"i'-.-4-'+--H'.-f..~--i.::(::~;;::;:::;::~:~:~:~ ~:::~::;:::q:~;~:~::+::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: i ;X7 ~ i ;7 ~ ; ~ ~; ~ i ~.~; ¥ ¥'7'";'"I"'?'m .....¥'?"t"I'"?"?"'"~"'~"~~'~ ...... m'"m"'""?"t-?'""? '?-'-'"t'-?'m ....... i ~ i i/ ~ i ~: ';;; ~ ' ~ i;; 7';"T'T'y":"T'T"i ...... T'T'T'T" "T";"T"7 ...... r'~'"~<"~ .......I'"¥'?"~-"'T'rT"; ...... ?"?"?"~"?";'"; ....... rT"?" &'?+'"~"+'"t"'+'"+'"+-+ ...... i.-.+..+..i-.-t.--i---i~+-.-...~.--~--+-.!-.-1...~-.-*.-+-.~..-.--~.~.-.*---~-.1.--*--.~---*.--~ ..... ,..~.4.~...,.~...;...i...~... ~4..1.1~4.~...~ ;.-; ,..;4.. ; 4.4 ;..~.-;~.~-~.- ~-~4 ;. "'~'"?f"?"f"f"!?+"-'?"?'t'"?+'t'"~'~+ ....... i--¥+-+-----~-..{.-+-.+-.-..-+---!..-i.++-;-.+..~.-.~....-.i---~-..+.-i ....... i-.-~-.!..-{ ....... ;-.+-4--+ ..... ~--+..+.'+...-.i..+.¥.+......i..-¢...&4 ...... !~--I- 'X;'??T~'"?"?"7 ....... ?';'"m'-t-'¥!'~7 ....... ?-i-f-'-.-?~...t-t..-.-r?t--.i...t--i..-e?t.. ?.t-~--i-...-.?t.-.i...t ...... t...i.-t-~.--.+-.~.t...t.....--~+~..+.--i.-.i.--?+- -+-~-.+..~-.?{-. ' ?T'T'T""-T'T"rT""'T'T"?UT'"i'"r~'! ...... II'DnD~'T-T'T'""T'T"?!'TT"r'f't'" "J-'f'f"?""'f'f"fT" '"f'QT"f","~"~"+-i ....... i..+..i-..t-~.-i-.i...?..i ..... · .+--~-..i-i ....... ~.--i..-i--.i ...... i--.¢.-.~---~--.~-.-i---i...~.--~ ..... ¥+..4-..i ....... i...{...1....~ ....... i-.++..i.-.~..-{...!...{.--i....--.i...i...;.--; ...... ;-..i...i...; ....... i-+..;...;...I...L.i...i...;...~...;...;...;..;......;..+..~...; ....... ~..-i...i..4... -f-i...?.f--"+"+-+'¥-'4"'i"4'"?T"'$"+"%'"+ ....... +'"i'"+'"~""'"+"+"~'4'" '-'1'4"'{--'i."r-+'+..*...¥- -.+..~...~...a... "'+"-~--'~'--i....-.i...+-.i'..Lt.'+.-~..-!.-i....4..4-..¥+- ..-~-.i..~...! ....... i-..~.-¥+- .--!-~-..~-.-~ ....... ~..4...~...~.....&.4...+.4...~...,...~...;.-~ ....... ~...~ ...... ~ ....... ~...~...;.4......i...;-~...i..+.~...~...4...a...-4...i...;..4.......;...;...;...; ....... i...i...~...;...l...~..4...~...;....;.4-;-4... ,.-.%...~. -$...i ...... i-..~...1...+..- .-.~--.~.-4...¥. · -a.~.L.4 ....... L.L.L..i ....... L.L.;...L.i...L.!...;...~ ..... L.L~...i.......L-i...L-L....i...L.;...L.I...L.L.L.i ...... L i.i i. ; i i; i ~; i % i i i ~ i i; I ; ~ , ~ I; I; ; -: ~ ---i--+!.+-ri..-~.+-+ ....... !-..¥+--+...i..-;--.;...~.--~ ....... +.--:--.~...~.-.!.-.{---+...~..-i...,-..{.-i..-+.-.~.-.l..-i...+...{--.~....-.~--.~.-.~--.;..+.;-.+-.;..-~...'...~.-.LL+..I...L~-i...; ...... 4.4.4...L.,...~...i...L4 ..... 4.L44.....~...4L.~... -T"r"?~-~ -'?-~"?"?" "~?"r"?"T".-'?~'-!'"' -'~'"r"?~- p~' -~'-?' -'+"!"+"~'t'-!"'~'+'+'- "'+"~-'+-.-i'.+..~---~.-+--~..- .-.i.--i..-~.-.~-..t...+.-*-..~.i.- -i...;...i...i.- ...i ...... r..~ ....... ~..i...~-.i.- ~..i....-.i ....... · .74--.!---i.-.~..+-.¥.i..-~-..~..+++--+-.t-..~.-.¥-~...+ ...... {--'~"'~-'? ~--&~.i----i...~..~--;-.l---~--+.-~-.; ....... i..i-.;...,...L..L_L..i..~.....:...a....~...!...L.i...L..i ....... L..;..~_.L.....L.L....~ ....... L.i.-L.L- ?+"~"?"~-'~"+"+"+- "+"+"+'+"!'"i'"~'"+"~ ..... i...+...i...?~-+~4~.+..f..-k+.+..?.~...+...~.+..+.......~...~...~...i...i...~...~...L..~...~...~..+..`...;.+.~ ....... +.-+ ....... i...L..i.--~-.-~.-.;..4...i...i ....... i...:---i...i..-..--+...4..-4--.4 .... '-i"f"i'"? -'i'"k+"t-l'''i-i'''f'+''l-~'?'e-~ ..... f?f'~ ~-~'w" -N'-i-i'"f'" '"?'f"f"r""*+'+"i ...... i-..!.--+.-.+ ....... !.-.~.-+-+..f.+-.?t..i-. --i-'-~.-i?t-..~-~.~..+...-.i.e-~-.~.-~.- ...~..i~-~.. ~_.¥+~_.+ ...... i..~-{..-{.-~...i..4-i...~.....;...~...~_ ..~.L;~ -l...i...~.~....L.;_i..4...; ...i...i...;...i-....i...;.-4.-; ....... ;..4..4...;...!...;...;...~-; ...... ;...~...;-.;-1...~...;-~...~...1 ...;..4...~..;... ?-?'?F?T"r"t' "'i'"h't"~ ....... ?'i'"?' "'t'?"ff'-~--i'"ef'T'"'d'"~'"?'+" .-.f.-f-.i...! ....... ~..-f..f..i ....... i'"i'"i'-'i--'t--'~'+'~'"+ ...... ~'"?'i"-i"'i'--~'-'~'"!.'+"~"'f"i"++- "~-'"T"' - ~-r-r-~-'?' -I-~-'~'''~'- '"t"~"'~--~ "?--~"-~ --~'~ i 4 i ~'" :"~"'~-?~" '-!-+'-r"i ...... +'"!'"i-'+ ...... ,"+"r"~"~"'?"~"?~ ...... +-.-~--.+-+..t.~-+.+..~-....+-+-.l-i-.....~..m..~.- ........................................................... ?-}' ............ '"'-?"'"?'"' ...... '"'""~'": ...... '"'?"7t-',-?'-, ............... ?"?,"'t-~-','"?", ....... ~ ...... ~?-+'?'"~ ....... '-~---~--$---~--.~-.-~...i.--+...¥---~--+..-~-.-$-...--.;---¥-*.--f ...... $-.-¥-$---i------~4--i...i...~.--i...L.+--i---t-..f-.-L..L..¥--4-.-$...f-.+-...+.+-.~-.-+ ......... ~...;...¥.,...~ ....... ;...:...~...;...~..4...~...,...~...~...¥.~ ...... ;...~...~...~..+..:...~...;...:... -~.~.-~.~...~-~..4..-~-~-....~...~-~..4--.~--.~-.4..- ~..4-~..~ .-~ -~-.~...~...~-~.-~-.~...~...~.......$...~...~..4...L.+..~...~...~..- ..4...,..4...:...~...~...~...~...~.....4.-~...~-.~......~..~...~-.~ ...... ~...L4.-~...~.-L.~-~.L. -.~?--~.t ...... ~--?-'?'?--- '"?-'?'-r.-?-- ...?~..---., ....... ~.--+...--.-t ....... ~'"~"+" "'~'"?"+"'"' '"~'"~"~'"~" '"$'"~'"~"~ .... $'"~'"~"'~ ....... *'"~'"~'"~'"I" ~"'~'"'"'~ ...... ~...~...~.~-....~...~..4..~ ..... $..~...,..4...L..~...~...~...$... ....... ...... ...... -"1~'+-4~-~-+-~+-.. ~+.?-;..~..+.+-i...i.-+... "+"~'-5"-r"~+'~ ..+.4-??.+..~.~-+...* ...... ¥.?~..+.+-+..+~..i ...... ,-4...: ....... ~...g...:-¢ .......... ,...~...¢~- ...¢...~..4..4 ...... -~&-¢4-4-.&.4~...-&~..4-~...¢4...~...*...;..-..4..~a...*-*-...&-4...g-..:-4..4...g-*-~--¢..h.4...:...~...:...;...L..~ ......... ........!.{..~..: :. : ~ i.~ i~;-~ .1 :.¢ ~.~.~ ~ ~ 148. -.I ,,.. II ,.., PROJECTION ON VERTICAL PLANE 148. - 9Z8. SCALEO IN VERTICAL OI[PTI-~ HORIZ SCALE = 1/2000 IN/FT r ,..-,.,- :..~-~ ,--,,=,, ~, Teleco Oilfield S es Inc. I ,~'~,,~./_i.J 16116 Nielson way ~ II Anchorage. AK [._--T'~ ' ~',~ I~ 99518 ~'~" ' '~ ~ (907) 562-2646 ORIGI AL August 14, 1990 JOB Cf 763 ARCO ALASKA, INC. WELL: DS16-23 PRUDHOE BAY RIG: NABORS 28-E Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to ARCO Alaska Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Jonathan G. Mapes Field Operations Supervisor JGM/kh Enclosures ::'"_o -.. G ~999 Alaska Oil & Bas Ooi~s, Oott-~tssioU Af~chorag A ,~jlJ_~'l' COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 6-4-90 Company: Arco Alaska Inc. Well: DS 16-23 Location: Prudhoe Bay Rig: Nabors 28E TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 763 TAK 0.0 30.8 30.8 147.8 MINIMUM CURVATURE CALCULATION ************************************ Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100g Tie In Coordinates 506 941 1445 1963 0 0 0.0 0.0 0.01 -0.00 0.01N 0.01E 0.01 N 45.00E 0.00 Teleco MWD Surveys 506 0.7 67.0 505.99 0.45 1.26N 2.86E 3.12 N 66.16E 0.14 435 0.6 141.2 940.97 3.14 0.53N 6.73E 6.75 N 85.54E 0.18 504 1.0 122.6 1444.92 9.74 3.90S 12.09E 12.70 S 72.11E 0.09 518 1.6 116.2 1962.78 19.9.9 9.53S 22.38E 24.33 S 66.94E 0.12 PAGE 1 Company: Arco Alaska Inc., Well: DS 16-23, Location: Prudhoe Bay, Rig: Nabors 28E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/1006 2503 540 1.5 126.0 2502.58 32.97 17.01S 34.87E 38.80 S 63.99E 0.05 3042 539 2.1 120.1 3041.32 48.27 26.11S 49.12E 55.63 S 62.00E 0.12 3443 401 1.8 144.0 3442.09 61.06 34.89S 59.18E 68.70 S 59.48E 0.21 3637 194 3.0 135.6 3635.92 69.06 40.98S 64.52E 76.44 S 57.58E 0.64 3827 190 8.0 147.5 3824.99 87.15 55.70S 75.11E 93.51 S 53.44E 2.69 4020 193 14.2 140.5 4014.29 124.10 85.32S 97.40E 129 49 S 48~ 78E 3.28 4210 190 19.3 144.4 4196.18 178.60 128.86S 130.53E 183.42 S 45.37E 2.75 4400 190 21.5 145.1 4374.25 244.73 182.96S 168.73E 248.88 S 42.68E 1.17 4590 190 26.5 141.0 4547.78 321.65 244.50S 215.36E 325.82 S 41.37E 2.77 4814 224 30.0 144.0 4745.08 427.19 328.67S 279.75E 431.61 S 40.40E 1.69 5004 190 32.0 148.0 4907.95 524.95 409.81S 334.36E 528.90 S 39.21E 1.51 5195 191 37.0 144.7 5065.32 633.02 499.70S 394.43E 636.61 S 38.29E 2.79 5385 190 43.0 145.4 5210.81 754.96 599.78S 464.32E 758.51 S 37.75E 3.17 5575 190 50.1 146.1 5341.39 892.72 713.75S 541.86E 896.13 S 37.21E 3.75 PAGE 2 Company: Arco Alaska Inc., Well: DS 16-23, Location: Prudhoe Bay, Riq: Nabors 28E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100& ******************************************************************************************************* 5763 188 51.5 148.2 5460.22 1038.38 836.14S 620.86E 1041.44 S 36.59E 1.14 5975 212 53.4 148.2 5589.41 1206.44 978.98S 709.43E 1209.00 S 35.93E 0.90 6295 320 56.3 148.9 5773.63 1468.04 1202.18S 845.90E 1469.96 S 35.13E 0.92 6613 318 53.6 150.0 5956.24 1728.23 1426.33S 978.24E 1729.56 S 34.44E 0.90 6926 313 54.0 146.8 6141.13 1980.74 1641.40S 1110.58E 1981.81 S 34.08E 0.83 7240 314 56.0 147.2 6321.22 2237.91 1857.11S 1250.65E 2238.97 S 33.96E 0.65 7555 315 54.9 146.8 6499.86 2497.33 2074.70S 1391.95E 2498.38 S 33.86E 0.36 7871 316 52.8 147.2 6686.26 2752.45 2288.67S 1530.92E 2753.50 S 33.78E 0.67 8182 311 52.6 148.2 6874.73 2999.84 2497.78S 1663.11E 3000.81 S 33.66E 0.26 8495 313 53.0 148.2 7063.97 3249.14 2709.67S 1794.49E 3250.00 S 33.51E 0.13 8809 314 53.5 148.6 7251,84 3500.72 2923.96S 1926.32E 3501.46 S 33.38E 0.19 9122 313 53.3 148.9 7438.46 3751.97 3138.78S 2056.68E 3752.58 S 33.23E 0.10 9434 312 54.4 147.9 7622.51 4003.88 3353.34S 2188.69E 4004.41 S 33.13E 0.44 PAGE 3 Company: Arco Alaska Inc,, Well: DS 16-23, Location: Prudhoe Bay, Rig: Nabors 28E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity ~ feet feet deg deg feet feet feet feet feet deg deg/1006 ******************************************************************************************************* 9652 218 54.3 148.6 7749.57 4181.02 3503.98S 2281.91E 4181.50 S 33.07E 0.27 9811 159 53.4 148.2 7843.36 4309.40 3613.33S 2349.18E 4309.85 S 33.03E 0.60 9969 158 53.8 147.2 7937.12 4436.57 3720.82S 2417.14E 4437.01 S 33.01E 0.57 10126 157 52.9 148.6 8030.84 4562.52 3827.51S 2484.08E 4562.95 S 32.98E 0.92 10284 158 53.3 149.3 8125.71 4688.84 3935.76S 2549.24E 4689.23 S 32.93E 0.44 10422 138 53.8 148.2 8207.70 4799.83 4030.65S 2606.83E 4800.18 S 32.89E 0.74 10599 177 54.1 148.9 8311.86 4942.92 4152.73S 2681.49E 4943.24 S 32.85E 0.36 10757 158 54.8 147.9 8403.73 5071.46 4262.22S 2748.85E 5071.76 S 32.82E 0.68 10944 187 51.2 146.8 8516.25 5220.77 4387.96S 2829.38E 5221.07 S 32.81E 1.98 11065 121 51.0 146.8 8592.24 5314.93 4466.75S 2880.95E 5315.24 S 32.82E 0.17 11380 315 52.0 146.8 8788.33 5561.41 4673.03S 3015.93E 5561.75 S 32.84E 0.32 11697 317 48.6 149.3 8990.80 5805.23 4879.85S 3145.07E 5805.55 S 32.80E 1.23 11920 223 49.7 149.6 9136.66 5973.84 5025.12S 3230.81E 5974.11 S 32.74E 0.50 PAGE 4 TI ECO Oilfiel~ Ser'v~¢ PLAN VIEW BO0 01 " 4400 ' 5004 ' 5385 ' 6295 ' 6926 ' 7240 ' 7555 ' Arco Alaska Inc. DS 16-23 Prudhoe Bay Nabors 282 JOB# 763 TAK/O0 SCALE: 1 inch = 800 feet 800 1600 400 ~ 0 32oo ~ 4000 4800 5600 6400 4000 4800 · . 2000 4000 %6000 °8000 >10000 12000 ~.4000 '16000 18000 T ECO Oilfield ServicE VERTICAL PROJECTION -~000 ~000 3000 5000 7000 9000 11000 506 ' .7 deg 941 .6 deg i445 ' ~. aeg Arco Alaska Inc. ~963 ' ~.6 oeg DS 16-23 Prudhoe Bay 250a ' &.5 deg Nabors 28E 3042" 2.1 deg JOB# 763 TAK/O0 3443 ' 1.e aeg SCALE: I inch = 2000 4020 ' ~4.2 deg feet 51 90 ' 26.5 Oeg 5 ' 37 deg ,,,.. ~75 ' 53.4 aeg i ' 52.8 deg  9 ' 53.5 deg ' ~52 ' 54.3 deg ~22 ' 53.8 deg ~t3~8~09;0 ?2 4;.e¢ deg VERTICAL SECTION (ft) PERMIT # ,~'0 - ~.~' WELL NAME Z:~)~ ,,/6x ~,..),~ .................................. X-OG~ G E-O LO GIc. AL' MAT~m~LS '~.~e NT6R~"Li'sT .......................................... I cored i~',terv~ls , core ,~.~iysis, (~ dry ditch illtervalsI"' ""'di'~iiial dala ,, ,j · ......... ~ ~/~ ~/~-~/('~~ i ' I,, , I , ..... ~ ,, ........ I .... ! LOGiTYPE I ~o1 I il4) ~ .s} J t / DATE · '7-:~i -90 R ti:.' F' E R E N C E · A R C 0 N A (.; N iii: T I C: T A F:' E ( S ) W I 'T' 1"t t... ]: S T ]: N (;- ( S ) F:'I... E A S E ,? I (; N A N D R E'T' U R N T i"t Iii: A'T' T A C I"tiii: D C O F:' Y A S I:;'. E C E I F:"f' O F:' :() A T A~ R E C I-E I V E D B Y ....... i-tAVE A NIE:tF_' DAY! ,/ A F:: F:' R 0 V I::: D .~ 'T' R A N S ::: 9':'.')/~, ':':)(') A T' 1... A ,'ii; '1" Iii: I... Iii: C O 'i" iii: L. ii: C O D I ,'<.' 'T' R I B U T ]: O N C: EE N T F;.: A L F:' I L.. EE 67 ( C H ) C: I"t E V F;:. O N D & M "f'Ai~MAS BF;..'CiWN ( C)l'.! ) E X X 0 N H A R A T I"10 N MOB I L :~ F:' H I 1._ L I F:' 2/ F:'B W E t...t... F' I L.. E. R ~.~ D '"' BPX 'ir '"' S TA i" ti:.:' O F:' ~'-~ L A,'.:':,' K A 'i!' '¥' ~i: X (4 C 0 ARCO ALA~i.'KA: ZNC P ~ 0 ~ BOX i ANCHORAGE '" DATE· '?-3,:,:;,' - '~0, F' R 0 D U C'i" ][ ;3 ,,':i i'-" R 0 F' .[ l.. IS , ~::- ,., v i) iii.-f' E C'¥' i r'i N L :_ t"l I--. .... l N.J E C T :!: ['-i i"'.J: F:' F;.: ('~ F' .i.' L iF- :i: N ,.J E C ]" :l: F) i"'-i F:' i:;..' (:)F' I L. iii: P R 0 D U C '!" :i: C! N P R C.~ i::' i i.. ii"' ]: ,N ,_i E C 'f' :[ [2 N F:' R 0 F ]: L.. E: P i':.'. 0 D L.t C 'i" ]: 0 Fi P F,.: 0 F:' :[ L ii:.: L...r:.-: A K D E'f iii: C T I (] i"-.! (.:.R COL_i_AR "" F;.'..."'t 0 L ~ A R I..'1 ... ~.o. ~,.. E A..-u-', D F T ii:' rI .... T I Fi N, .," , ~::' .~T 'i" F'!_ E A $ E 5' .l: ('..;- N A N D R E"[' U R Fi T H E A"F T A C i.-i i-i: i) C: [3 ~ Y A :"".: t:;.: E C E I P "f' 0 F' I) A T A., F;.'. E C: 1.--. :I_' V E D B",," ............... ~._._~_..~'_._..~_._i~"_..__.__. ......... H A V E: A i:.J. :1: C Ii-" ii]) A Y ! ,~: A L. l... 'Y I.-10 F: F:'E C': K ,r.'i: F.: AT,g- i 529 L,' A f'"'l t..: t.J C A !'! C i. jj F'-i'::'i P", i': f"l (... ~'::~ I'"'~ (]. C.'. · '...: ~'::'~ .,'"i C 0 C A ~"'~ C 0 (." A Fi C: !...i C A P! C 0 L.' A Fi t..: tJ C: A H C': 0 D .i: ,S-' T R :1: B U T ]: 0 N :.":.CENTF:AL F' I LE3' ~.I: C': H E V R 0 N D .'" H · II:E X T E N ~: _i_' 0 N E X F' 1_ 0 R A i" I 0 i'.! · ,.'"' F X X 0 N HAR~THON · "' H 0 B :[ I_ '11' A R C: 0 A L ASK A, .'il ix! E:., P, fi, BOX ANCHORAGE, AI_ASKA 9951 DAi'E · '7- i 7-9~..) I;,' E'. I:"' E R E N C E ' A F.: C 0 C A S' E' D Fi 0 L. E F:' I N A L S S .-'? ,:ii, .--'2 '7 -9 ,::} /~, - ,.~"::: '7 '-' 9 '- ':;', A,_. ,a .... "z 6 -~:"' P, -- 9 (';:, 6 -9 '," - 2- 9 6- i '2. 6- 2. 3: .... 9 6.--i '2 6-2S-9C:, '7 .... i "i. 6"-'24-9(-) 7 -:3:3 '7 --' '? -- 9 '::;, 9- 2. 9 6 '--;:29 ---9 9 .-'3 '2 7 - 8 - 9 '::} 9- 3; 2 7 - 8 .... 9 ':":" -';~ ':' '? -- P, '-' 9 ::':', i 2-5 6-22-°0,. i :.-3'--5':-6-- 2 L"'~- 96, i 4 ..... i '~' 6 .... ':";":, 9 i 6-2S '?-9-9¢, PWDWi ....":' .., , .,. 6 / 29- 3,':', / c',:-") I N J E C T ]: 0 N F" F;.: 0 F' I i_ E:' C: 0 I.. L A R / F:' IS R F- F:' t:;.', i10 U C ]" ]~ 0 N e R [) ~: I L. E F'i:;..'ODUCT I ON F'I;.:OK T_ t_E "f'BG TA];L. PRODUCT' I ON F'RC!FILtE F:' R 0 D LJ C T i 0 N P R 0 F I L E PERF R ["] C 0 F;.: D P R 0 i') U C T Z 0 N P R 0 F i L.. E WA 'r E R F"L C~W .... CC~NVEN T I ONAL_ WATEF;.:F:L. OW .... I i'.-!VERT E D DUAl_ BURST TDT'-P t..EAK I)ET EC:"f' I Oi'~ LEAK DETECTION F'RODLtCTION F:'ROF'ILIE COL. LAR/F'ERr--" TEHP SURVEY (BASELINE) i:< i.j t...! F;.: U M RUN F;.". U i'.! RUN F;.:LJN F;; LJ N R U N RUN R U N RUN RUN R tJ N F.'. LJ N I:;,' U N RUN i i i i i, i, l, i; i, i, i, i, F'I._EA;!;'E SIGN AND r~ETURN THiS ATTACHED COPY AS RFCEII:'I" R E C: E: ]: V E: :C, BY HAVE A i"-.!IC:F: DAY! :? r.-'.', L L. Y H 0 F:' F'E c l< E: F,' ~cbO _r:aflQ -~'-'-- ATO-i 52? OF DA'FA. A PI-'"Fk' 0 V E !_) .....~ 'I'RANS:~ ~,29('} .5; ' !:5" 5." 5:" '5:" 5" r;: 5: i i .-) E: A ri C 0 A 'I' L_ F:~ C: A M C: U ('.; ~'::~ f--i C 0 L; A ri t]:: tJ C A id c C A r--'~ t.; 0 ;YCH C A M C O L.: H C ,¢; C: H $ (": H C A H C 0 C. A M C 0 [.'. A M C 0 A'T'LAS CAMCO D I $ T R I B U T I O N ~ CENTRAL FILES :~ F:'I'4 ILL I P.? .~'I:CHEVRON F'B WELL F'IL.E:S D & M I;..' & D · ,,-'"' EXTEN~'ION EXPLORAI"I ON .,."-B P X ~' EXXON. . .,.'"- STATE OF ALASI< A HARAT'HON TEXACO ~- MOBIl_ ANCHORA~"~E, AL_A,S'KA 99.5~ (~ D A T E ' '? '"' 5 '- 90 I:;:. Iii: F:' E R E N C: E ' A F;..' C C) H A G N E T I C T A F:' [.'i: ( ,~:J ) l,,.J I T I"1 I... I ,~' T I N [; ( ,S' ) 'i': ''''":'''~''o · ~-.. :.: 6-'t 8-9(.~) D]:F'L/ZI)L /,//~'"~5'*'~/" ,.JOB:,":44'"'8,... P I_ Iii: A :!¢ [5 ;ii: I (;- N A N D R Ii:' '}" U R N T !"1 Iii: A 'i' TA C: H E D C 0 F' Y A,~ F;.'. E (2 [.'= I P T (] e D A TA · HAVE (.':, N:I:CE r;,AY! .!ilL- 6 1990 :iCAL. t...¥ I-.I O F:' F:' I!!: C I< E: R Alaska 0il & Gas Uons. c;ommiSSiOnAF:'PI:;:O,~EI) ~ ,, t 0 · ~ 5 ';.:: 9 Anchorage 'rR A N.S' :.- 9 ,.~.'.' 6 2 i) I ,~.,' 'T' R I E', U T I 0 N C E N'i" R Al... F I L.. E,~¢ ,.'.' C !--! ) C: I-.t E V F;..' 0 N ]"AHHA..L." BROWN (()1-'1) E X X O N H A F;.'. A T I.-I O N H O B I I... · ..'"' P H i L L I F:' S F:' B W EJL.. L.. F: I L.. E: S R & D · ,-'"' BPX ,., 1 ~'~] F_:. OF Al_ASK A TE XACO il) A T E · 6 / 2 9/9 R Iii] F:' E'. R E i".i C,r.'i] · A F:..' C: 0 0 F:' IE i"...! H 0 I... E F' ][ N A I... ,'ii.' F,..' U N,i.;' "," .... 9, 2" 'T J!:. I... iii. C 0 R I.j i,.j.,'? ; ..... 9., 5:" "'i::' ::', .: ', .... I .... L..J ............. R t...J i"'-i E.' ",:' .... 9, 2" 'i" V ill.':, "J" E L. iiL C: ill} R t..j i"-!,':{; ? ."' 5:'., 1:.i; ""t" 'v' Ji) 'i'k: j... !iil i i) F:' L E A,? .'.'-'il ,? i ();. N A i"'.! i> R E 'T U I::.'. N T H E ;'.'~ 'i"'T A C j..i E D C 0 P Y A ;i{; R E iii: E ]1F:"i" 0 F:' ii:, A 'T' A ... F;:.ECEi!VED BY . ....... ~.- .... HA',,,:!ii: ,':'.", ]: (:::I!i: :,:::,A'r"! {[.. 0 5 :14: r:'.",l... L. Y H 0 F'F:' iii: C K iii: R ?~ta.$ka Oil & Gas Cons. A'i" o ..... i iii:: ::2 9 Anchorag~ D I ;i{: 'T' R I B U '1" I 0 N F' ,. 0., B 0 X i (-) ,:.-'..', ..'~ 6':') , .., I,. A "." '-' :3. i O A iq C iq C{ R A f5 E A L.. A c,., 7' 7 DATE ' 6/27/90 I:;.'.["FE:RENCE:-: ARCO CAS'ED HOLE FINALS 4-i 6-2i -90 SEGMENTED BOND/GF:/CCL 4-i 6'--2 i -90 CC.L_ i '- i,.,° 6 -iii "- 9 (Z:' F' E Fi'. F 2"-i'7 6-2i .... 90 CBT 2-i',:' A--2i-90 BRIDGE PLUG RECORD 4-5 6-i '7-90 NO :[ 2E/TEl'iF' .,. '~' -.- 3 6 - 2 i - ':=', ,':"..., (:; R /C:_ C. L. 15--.3 6-.-2 i '-9'("2 !::'LEi.;..'I:r RECORi':' ,":,-2..':'.: ..5 - ") ;:", - q;' O,=. ,, . . C:Ei"/GR 6-2:;5 6--20-90 CBT ,.,":'--":'.q~:.... 6-2,':, -- '''a ,':,,, , ... I:'KR SETTINI'i;. RECCll.;,'I) F' !.. Iii: REC A2E £'.[GN AND F;:E'T'URN THE ATT~OF'T' AS I:;:ECEZF'i' E ]~ V 1:.:~ D B Y ................... ~~ HAVE A N:[CE DAY! ;SAL..L_Y i-IOF:F'ECI< ER ATO-'i ~'29 RECEIVED d U L - 2 1990 Alaska Oil & Gas Coris, Commission Anchorage D 1' £'TR I BU l' I ON U I::' .D A'['A · '~ F:EN TI;,'A L. I-- 'r I_IEZ ~ ,il. ~,- C H 12[ V R 1.') N . D & M · .-'"' FXTE:N,'.:.: I FIN.. . EXPI_ORAT I ON :~: ~: E X X l"l N "~ .... 'ii'" H A R A T H 0 N :~ HOBI'L F'H I t_ I_ I F:' $ F'B WELL F'IL. ES' F,,' & D BF'X $'I"A'i"E OF' AL. AS'I<A 'i"EXACO A "l' L. A £ A'i L A Z I--IL_ Z ;S' C H ,? C :S' ('_: !-4 ,? C H ,'.:..' (':: H ,S' 1'2 J--{ ;:i: ['.: i..J ,'S' C: l--J P ~, (') ,. B 0 X i (') () 3.' :6 (-) ? A N C l.'i 0 R A G E, A k. A :?K A 9 :'..-, ~;. i (:;: DAT1E ' 6-°.5-9~,:. F;.:. E F:' E R [il N CIE ' A R C 0 0 P E N I"I C'il... E F' I N A I... i 6-...2S ,4-t 8 .... 9¢..~. :;~'"',.., ]" ':Dy t:(:UN i , ! 6"'-2 S 6 .... t 8-.- 9 0 D t F I... "-' .= ,-,, R i IN I , i 6 .... :~.J:;'.'":; 6 .... t 8""9() Z.'()I.../'CNI...i...(:;I:;; ( RAW ) t:;:Ui'.J, i , f 6' '2 '3; 6 .... i iii- 9".;(:, Z D 1.../C N i... "- C- F,.' ( F:' :} F;: 0 ) R U N 'i , ,.'I...[:.¢..t,.":.[:. 2I(.;N ANi)I:;.:E"f'I.IRN TI'iEJ :'~""f'ACHIED f';riF:'"r' A.'!i: Rlii:CE];I::']" OF:' DATA ,:;.:ECIE ]; VED BY ............ ~~ _~ ....~.......~. _ ..~lJ. i.-!AVE A iWICIii; DAY! ;i-;' A !... I... Y H 0 F' F' Iii. C K Iii; R A 'ro .... i..,, ,..:.'::':":';..: Alaska Oil & Gas Cons. L;,ommW~'to~ 'Anchorage A P I::' 1:4 0 V lie I) ..~V "./.'4 ?' f' I:;.: A N ;:':: :~ 9(') A '¥' t... A ,?;' A'f' L.. A ;ii; A 'i" I... A,? A 'i" I... A ;ii: D 15: T R I B U 'f' I 0 N TO: THRU: FROM: MEMORAhOUM of Alaska =ALASKA OIL AND GAS CONSERVATION COMMISSION' C. Smit~% DATE: June 21 1990 Lonnie Commissioner / ~ ' FILE NO: JT. BF. 621.3 TELEPHONE NO: SUBJECT: BOP Test AAI PBU DS 16-23 Permit No. 90-62 Prudhoe Oil Pool Bobby D. Foster/~'~~. Petroleum Insp~h~for Thursday & Friday June 14 & 15 - 1990: I traveled this date to Nabors Rig 28E ~d'"'LWi'tne'ssed' th'e BOPE test-[~ As the BOPE test report shows, there were 9 failures which were all repaired or replaced before I departed the location. In summary, ~ witnessed the BOPE Test on Arco's DS 16-23. At tachment 02-00lA (Rev. 6/89) 20/ll/MEMO1.PM3 STATE OF ALASKA ALASKA 01L AND GAS CONSERVAT i 0)4 COM,'4 ISS ION BOPE Inspection Report DATE General h°usekeepi ng ~-. Rig ~ Reserve pit MUD SYST~S: Trip .tank Pit gauge Fl ow monitor Gas detectors-,- · BOPE STACK: Annul ar preventer .. Pi pe rams B1 ind rams Choke Iine valves HCR valve . Kill line valves Check val ye Vi sual Audio Test Pressure ft psig psig Pump incr clos press 200 psig -- min~O Full charge press attained / min Controls: Master ~_~ ~ KELLY AND F~OR SA~Y VALVe: Lo. er Kelly Ball type Inside BOP sec Choke manifold / Number val yesI I l ~ , Number fl anges ~/~ Adjustable chokes, 2~ Hydraulically operated choke Test pressure Test pressure Test pressure Test pressure~ TEST RESULTS: Repair or replacement of failed equipment to be made within and Inspector/Commission office notified. __days C.OO~ (rev 03117189) ~ STATE OF ALASKA -- - ALASKA OIL AND GAS CONSERVATION COMMISSION O R I 6 I ~I ~ APPLICATION FOR SUNDRY APPROVALS ,, 1. Type of Request: Abandon __ / Suspend __ Alter casing _¢_ Repair well __ Change approved program ..¢_ Operation shutdown __ Re-enter suspended well __ Plugging __ Time extension __ Stimulate __ Pull tubing __ Variance __ Perforate __ Other __ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of well at surface 1624' FNL, 1249' FWL, Sec.24, TiON, R15E, %TM At top of productive interval 1210' FNL, 970' FEL, Sec.25, TiON, R15E, UM At effective depth 1293' FNL, 917' FEL, Sec.25, TiON, R15E, UM At total dep_th 1376' FNL, 865' FEL, Sec.25, TiON, R15E, UM 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) P~{B 70' GL 38' 7. Unit or Property name Prudhoe Bay Unit 8. Welt number PBU DS 16-23 9. Permit number 90-62 10. APt number 50-- 029-22050 11. Field/Pool Prudhoe Bay Field feet 12. Present well condition summary Total depth: measured true vertical Effective depth' measured true vertical Casing Length Structural 78' Conductor 3413 ' Surface Intermediate Production Liner Perforation depth: measured true vertical Tubing (size, grade, and meaSured depth) Packers and SSSV (type and measured dept~) Size 20" 10-3/4" feet feet feet feet Plugs (measured) Junk (measured) Cemented 1775 # Poleset 1000 sx CS III & 300 sx C1G 155 sx CS II Measured depth llO'ff~) 3446'MD ~ueverticaldepth ll0'TVD 3446'TVD RECEIVED 13. A~achments Description summary of proposal __ Detailed operations program ~,- BOP sketch __ 14. Estimated date for commencing operation 16. If proposal was verbally approved Nameof approver Lonnie Smith 6/13/90 Date approved 15. Status of well classification as: Oil __ Gas __ Suspended __ Service 17. I hereby certi~ that the foregoing is true and correct to the best of my knowledge. ~,$~u,¢,~,,~~ Signed ~./~,__/'~'~ Title Regional Drilling Engineer Date /' / _// FOR COMMISSION USE ONLY 112, S~A4 pproval//A ConCf~j4f'ns of approval: Notify Commission so representative may witness No./'2,¢~... // Plug integrity __ BOP Test __ Location clearance __ .~ Mechanical Integrity Test __ Subsequent form required 10- '?-~ ~i'- ' Approved by order of the Commission Form 10-403 Rev 06/15/88 ORIGINAL SIGNED ~ BY LONNIE C. SMITH ,~,.,.--_ Commissioner · ,~,~, uveU L;Opy /~/~e~ Date SUBMI~ IN TRIPLICATE NOTE: PBU DS 16-23 REVISED OPERATIONS SUMMARY 1. MIRU drilling rig. NU diverter and function test same. 2. Drill vertical 13-1/2" hole to 3500' TVD/MD. 3. Set 10-3/4" casing and cement same. Nipple up BOPE and test to 5000 psi. 4. Pick up 9-7/8" BHA and GIH. Test casing to 2500 psi for 30 minutes. Drill 10' of new hole and perform leakoff test. 5. Kick off and build angle at 2.5 degrees/100 ft. to 520 32' in the S 32 o 11' E direction. End of build is to be at 5319' TVD / 5602' MD. 6. Drill 9-7/8" hole to 9025' TVD / 11,695' MD maintaining the hole angle and direction. (See Note Below) 7. Set 7-5/8" casing and cement same. 8. Pick up 6-3/4" BHA and GIH. Test casing to 3500 psi. 9. Drill 10' of new hole and perform EMW test. 10. Drill 6-3/4" hole to 9186' TVD / 11,961' MD maintaining the hole angle and direction. 11. Run wireline logs as programmed. 12. Set 5-1/2" liner and cement same. 13. Clean out the liner and test liner to 3500 psi for 30 minutes. Circulate well to brine. 14. Run cased hole logs. 15. Run 3-1/2 tubing and packer assembly with GLMs. Test tubing and casing t~3~0~. 12si.~F~r~ protect with diesel. , . K 16. N/U tree and test to 5000 psi, Release ddlling dg. JUN ] ¢.' ')'~' 17. Rig up wireline unit and perforate. ~.0il .& 6as Cons. CommisS~ ' ~"'~'~'t. Anchora~ ff the mud weight is less than 10.0 ppg when 9025' TVD / 11,695' MD is reached, the 7-5/8" casing point will be extended to 'rD and the 5-1/2" liner will not be used. · Antcipated BHP: 3900 psi (8.5 ppg EMW) @ 8800' TVD · Maximum Anticipated Surface Pressure: 3020 psi · Planned Completion Fluid: 8.6 ppg Seawater Gas Cons. Commission Anchora~ NOTE; PBU DS 16-23 REVISED OPERATIONS SUMMARY CONT. a. Excess non-hazardous fluids developed from the well operations and as necessary to control the reserve pit fluid level will be pumped down the 7-5/8" x 10-3/4" annulus. The annulus will be left with a non-freezing fluid during any extended period. The annulus will be sealed with 300 sx of cement followed by Arctic Pack. b. Wells within 200 ft. of the proposed well is: DS16-24 35'ft @ DS16-4 78 ft @ DS16-21 110 ft @ DS16-3 118 ft @ DS16-22 120 ft @ DS16-20 170 ft @ DS16-6 175 ft @ 800' TVD / MD 3600' TVD / MD 1300' TVD / MD 3799' TVD / 3800' MD 500' TVD / MD 1900' TVD / MD 4646' TVD / 4700' MD c. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.033. d. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/fi). e. Based on previous logs on DS 16, no potential productive zones are anticipated above 3500' TVD. f. No potential hazardous levels of H2S are antidpated in this well. May 17, 1990 Telecopy~ (907)276-7542 Mr. John Gillespte Regional Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Re: P~dhoe Bay Unit DS 16-23 ARCO Alaska, inc. Permit No. 90-62 Sur. Loc. t624'F~, 1249'~, Sec. 24, T10N, R15E, UM. Bt~ole Loc. 1376'FNL, 865'FEL, Sec. 25, T10N, R15E, UM. Dear Mr. Glllespie: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other .governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE tests that it wishes to witness. Verx_.truly yours, Chair~n of Alaska Oil and Gas Conservation Co~ission BY ORDER OF THE COPR~ISSION dlf Eno lo ~ur e Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. la. STATE OF ALASKA ALASKA ,_ AND GAS CONSERVATION C,,. MISSION PERMIT TO DRILL 20 AAC 25.005 Type of work Drill ~ Redrill Z1 lb. Type of well. Exploratory ~ Stratigraphic Test ~ Development Oil ~7----- Re-Entry - DeepenEI Service Z Developement Gas ~_ Single Zone ~ Multiple Zone ~ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1624'FNL, 1249'FWL, Sec.24, TION, R15E, UM At top of productive interval 1210'FNL, 970'FEL, Sec.25, TiON, R15E, UM At total depth 1376'FNL, 865'FELr Sec.25, T10N, R15Er UM 12. Distance to nearest ! 13. Distance to nearest well property line [ DS 16-24 ~, @ mr) feet .~5' af ~nn,~'vr~/Mr~ feet 16. To be completed for deviated wells 52o32, Kickoff depth3 500' feet Maximum hole angle 0 5. Datum Elevation (DF or KB) RKB 70' 38'GL feet 6. Property Designation ADL 28333 7. Unit or property Name Prudhoe Bay Unit 8. Well number PBU DS 16-23 9. Approximate spud date 05/28/90 14. Number of acres in property 10. Field and Pool 'rudhoe Bay Field 'rudhoe Bay Oil Pool 11. Type Bond Isee 2o AAC 25.025) Statewide Number 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Maximum surface 3020 psig At total depth (/VD) $ 900 No. U-630610 Amount $200r000 15. Proposed depth (MD and TVS) l1961'MD feet Q1R~ I'PVD.. psig 18. Casing program size Hole Casing 30" 20" 13-1/2" 10-3/4" 9-7/8" 6-'3/4" 7-5/8" 5-1/2" Specifications WeightlGrade Coupling 91.5# ~-40 Weld 45.5# i-55 BTC 29.7~ ~-R~ ];TC/M~D 17# k-80 BTC l~ngth 80' 3462' 11659~ 566' 19. To be completed for Redrill, Re-entry, and Deepen O Present well condition summary Total depth: MD 38' 38' Setting Depth Top Bottom .1395' ~erations. TVD [ MD TVD 38'I 118'I 118' 38' 13500'1 3500' q~l i~QKI I oJn'~q! ~842' [1961'l 91R6'__ Quantity of cement (include stage data) 280 sx CS II 1000 sx CS III 300 sx CL G ~ ~Y c1 G ...... {5 sx C] G measured true vertical feet feet Plugs(measured) Effective depth: measured true vertical feet feet Junk(measured) Casing Structural Conductor Surface Length Size Cemented Measured depth RECEiVEL True Vertical depth Intermediate Production Liner Perforation depth: measured true vertical MAY ! o 19.90 hh~.ska OiJ .& Gas Cons. Commissi'ori ~nchorage 20. Attachments Fill fng.. ~e ~ Property plat [] BOP Sketch ~" Diverter Sketch r~" Drilling program ~ Drilling fluid programBITime vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements 21. ! hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~~ ~/ ~ DC Title Date Rc~)in~:! Drilling. Engineer/ Commission Use Permit Numbe_r I APl number I Approval dat~6sW) Pn~i~e~ cover letter ! zo.¢o I 05 / 17 / 90 I for other requirements Conditions of approval Samples requ. irofl' ~ Yes ~ No Mud'lo{j r~o-~uir~d~ -D Yes ~l~No "~ Hydrogen sulfide.measures [] Yes /~_No Direchonal survey required ~, Yes [] No Required working pr. cs~ure for BQJ;~ E]_.2M; [].3M; ~ 5M; [] 10M; E] 15M Other: -- //~'-~///Z~ by order of ~.! Approved by [. '~ -.//. [ '..~,,/~..~~ Commissioner the commission Date Form 10-401 Rev. 12-1-85 13-5/8';- -'000 PSI BOP STAC -'91AGRAM ACCUMULATOR CAPACITY TEST IAN#ULAR 1 PR£¥£#T£R PI PE RAMS BLI ND RAMS DRILLING SPOOL PI PE RAHS DRLG SPOOL CSG SPOOL STARTING HEAD 11. 12. 13. 14. ALL BOP EQUIPMENT 15. 5000 PSI RATED 16. 17. 18. 1. CHECK AND FI LL ACCUMULATOR RESERYOIR TO PROPER LEVEL vWITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3;000 PSI WITH 1 SO0 PSI DOWNSTREAM OF THE REGULATOR. 3;. OBSERVE TI ME, THEN CLOSE ALL UNITS SI MULTANEOUSLY AND RECORD THE TI ME AND PRESSURE REMAI NING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TI ME AND 1200 PSI REMAI NING PRESSURE. 13,,-5,/8" BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH A NON-FREEZING LIQUID. 2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED. MARK RUNNING JOINT WITH PREDETERMI NED PLUG SEATING DEPTH. RUN TEST PLUG ON DRILL PIPE AND SEAT IN WELLHEAD. R U N I N LOC K DOW N SC R EWS. 3;.CLOSE ANNULAR PREVENTER AND UPSTREAM VALVES. 4.FUNCTIONALLY TEST CHOKES. 5. IN EACH OF THE FOLLOWING TESTS, FIRST HOLD A 250 PSI LOW PRESSURE TEST FOR A MINIMUM OF 3; MINUTES, THEN TEST AT THE HIGH PRESSURE. 6.INCREASE PRESSURE TO 3;000 PSI AND HOLD FOR A MINIMUM OF 3; MI NUTES. BLEED PRESSURE TO ZERO. 7. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR AT LEAST 3; MINUTES. BLEED PRESSURE TO ZERO. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES AND OPEN CHOKES. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR AT LEAST :3 MINUTES. BLEED PRESSURE TO ZERO. 9. OPEN TOP SET OF PIPE RAMS THEN CLOSE BOTTOM SET OF PIPE RAMS. INCREASE PRESSURE TO 5000 PSI BELOW THE BOTTOM SET OF PIPE RAMS AND HOLD FOR AT LEAST :3 MI NUTES. 10. TEST REMAI NING UNTESTED MANI FOLD VALVES (I F ANY) WITH 5000 PSI UPSTREAM OF VALVE AND ZERO PRESSURE DOWN- STREAM. BLEED PRESSURE TO ZERO. OPEN BOTTOM SET OF Pi PE RAHS. BACK OFF RUNNING JOINT AND PULL OUT OF HOLE. CLOSE BLIND RAHS AND TEST TO 5000 PSI FOR AT LEAST 3; MI MUTES. BLEED PRESSURE OFF ALL EQUIPMENT. OPEN BLIND RAHS. HAKE SURE MANIFOLD AND LINES ARE FULL OF NON-FREEZING LIQUID AND ALL VALVES ARE SET IN DRI LLI NG POSITION. TEST STANDPIPE VALVES TO 5000 PSI. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI. CHECK OPERATION OF DEGASSER. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRI LLI NG SUPERVISOR. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNC- TIONALLY OPERATE BOPE DAILY. JG 8-26-85 NABORS 28E DIVERTER SYSTEM SCHEMATIC ARCO ALASKA, INC. FILL-UP LINE RISER IFLOWLINE I I I ~ooo ~s~ 1 10" BALL VALVE ~"1"-""~ 10" BALL VALVE I I I ICONDUCTOR NOTE' ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND VENT LINE. THE SECOND VENT LINE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS A VARIANCE FROM 20AAC25.035 RESERVE PIT 10" VENT LINE WELL 10" VENT LINE DIVERTER LINES DISCHARGE 100' FROM RIG IGNITION SOURCE. ALL TURNS ARE 90° TARGET TEES. JG 8/6/87 PBU DS 16-23 OPERATIONS SUMMARY 1. MIRU drilling fig. NU diverter and function test same. 2. Ddll vertical 13-1/2" hole to 3500 ' TVD/MD. 3. Set 10-3/4" casing and cement same. Nipple up BOPE and test to 5000 psi. 4. Pick up 9-7/8" BHA and GIH. Test casing to 2500 psi for 30 minutes. Drill 10' of new hole and perform leakoff test. 5. Kick off and build angle at 2.5 degrees/100 ft. to 520 32' in the S 32 o 11' E direction. End of build is to be at 5319' TVD / 5602' MD. 6. Drill 9-7/8" hole to 9025' TVD / 11,695' MD maintaining the hole angle and direction. 7. Set 7-5/8" casing and cement same. 8. Pick up 6-3/4" BHA and GIH. Test casing to 3500 psi. 9. Drill 10' of new hole and perform EMW test. 10. Drill 6-3/4" hole to 9186' TVD / 11,961' MD maintaining the hole angle and direction. 11. Run wireline logs as programmed. 12. Set 5-1/2" liner and cement same. 13. Clean out the liner and test liner to 3500 psi for 30 minutes. Circulate well to brine. 14. Run cased hole logs. 15. Run 3-1/2 tubing and packer assembly with GLMs. Test tubing and casing to 3500 psi. Freeze protect with diesel. 16. N/U tree and test to 5000 psi. Release drilling rig. 17. Rig up wireline unit and perforate. · Antcipated BHP: 3900 psi (8.5 ppg EMW) @ 8800' TVD · Maximum Anticipated Surface Pressure: 3020 psi · Planned Completion Fluid: 8.6 ppg Seawater NOTE; PBU DS 16-23 OPERATIONS SUMMARY CONT. a. Excess non-hazardous fluids developed from the well operations and as necessary to control the reserve pit fluid level will be pumped down the 7-5/8" x 10-3/4" annulus. The annulus will be left with a non-freezing fluid dudng any extended period. The annulus will be sealed with 300 sx of cement followed by Arctic Pack. b. Wells within 200 ft. of the proposed well is: DS16-24 35 ft @ DS16-4 78 ft @ DS16-21 1 10 ft @ DS16-3 1 18 ft @ DS16-22 120 ft @ DS16-20 170 ft @ DS16-6 175 ft @ 800' TVD / MD 3600' TVD / MD 1300' TVD / MD 3799' TVD / 3800' MD 500' TVD / MD 1900' TVD / MD 4646' TVD / 4700' MD c. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.033. d. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/fi). e. Based on previous logs on DS 16, no potential productive zones are anticipated above 3500' TVD. f. No potential hazardous levels of H2S are anticipated in this well. lOOO i i I i i i I i i [ i I i i i i i r I i r i i i i i i i i i i i f i i i i i i i i ~ i i i i I i i [ i i i i i i i i r , i i AR( O DSlt -23 SC~E: '" SHL: U I~)N 1SE 24 1624' ~ 1~9' ~L THL: U 1)N 1SE 25 1210' ~{L 970' FEL BHL: U I~N 15E25 1376' ~ 865' FEL KOP ~=35~ 5.0 12~ ~17.5 ~0,~.0 ~s ~5~ ~5~ D~229 ~o ~ A~ ~GE ~G~ = 52 32' Top S~t ~ ~35 ~11712 D~ =5748 HOT ~~ ~11751 D~5779 OWC ~5 ~118, ~8 D~58~ T~ ~186 ~11,~1 D~5~6 ............................................................... 2000 3000 4000 5000 6000 7000 8000 9000 lOOOO 0 1000 2000 3000 4000 5000 6000 VERTICAL SECTION 7000 ARCO ALASKA, INC. DS16-23 S32 ll'E E - W COORDINATES -2000 -100~ 0 1000 2000 1000 4000 5000 6000 0 I ............................................... i i i i i i i i i i ~ i i i ~i i i i i i i i i _ 101 1000 0 -1000 -1000 [..~-2000 -2000 < r.~-3000 -3000 Z -4000 -4000 -5000 -5000 -6000 -6000 -2000 -1000 0 1000 2000 3000 4000 5000 600 ARCO ALASKA, INC. DS16-23 S3211'E E - W COORDINATES -2ooo -~ooo ..... 1~ ............................... 2000 3ooo 4ooo 5ooo 6o00 1000 ~ ~ , , , , , , ~ ' ~ .... ' ................ ' .................... 1000 tt,~, -1000  -2000 ~Q.)-3000 -3000 -4000 -4000 -5000 ~ -5000 -6000 ............................................................................ 6000 _ -2000 - 1000 0 1000 2000 3000 4000 5000 6000 150 _ 100 - 50 _ O a 50 _ 100 _ 150 _ 200 25O 100 5O · I ~ - 1 '800 3800 5O 10,, 150 2OO 1600 1 400 ,o I 1 200 I '~\1 000 1000 [ - \ \44oo \ An¢l~ora~ 2OO ' I I I 100 50 0 50 1 O0 1 50 200 150 100 5O 5O 100 150 20O 250 DS 16-23 MUD PROGRAM DEPTH DENSITY VIS YP INT 10MIN FL OIL SOLIDS (TVD) (PPG) GELS GELS CC/:30MIN (%) (%) MUD TYPE SPUD 8.8 300 70 30+ 50+ 25 0 2 to to to to to 10-3/4 9.2 100 40 6 csg pt. SET 10-3/4" CASING GEL-BENEX SPUD MUD DEPTH DENSITY PV YP INT 10 min FL OIL SOLIDS MUD (TVD) (PPG) (CP) (#/ft GEL GEL cc/30min (%) (%) TYPE 10-3/4" 8.7 10 6 2 4 25 0 2 LIGHTLY to to to to to to to to TREATED 5000 9.0 15 16 4 10 10 9 POLYMER 5000 9.0 15 16 4 10 10 0 9 LIGHTLY to to to to to to to to TREATED 7-5/8" 10.0 20 25 6 12 6 11 POLYMER csg pt. SET 7-5/8" CASING DEPTH DENSITY PV YP INT 10 min FL OIL SOLIDS MUD (TVD) (PG) (CP) (#/ft) GEL GEL cc/30min (%) (%) TYPE 7-5/8" 8.7 10 6 2 1 8 0 4 LIGHTLY to to to to to to to to TREATED TD 9.1 15 10 4 10 6 6 POLYMER SET 5-1/2" LINER THIS MUD PROGRAM IS ONLY A GUIDELINE. ACTUAL HOLE CONDITIONS WILL DICTATE THE ACTUAL MUD PROPERTIES. ~Inchora,.e'~, ARCO Alaska, Inc. Post Office [ . 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 November 7, 1985 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Conductor As-Built LocatiOn Plat - DS 16 (Wells 21 - 24) Dear Mr. Chatterton' Enclosed is an as-built location plat for the subject wells. you have any questions, please call me at 263-4944. Sincerely, . Gruber Associate Engineer JG/tw GRU12/L78 Enclosure If RECEIVED Nov 1 85 A~aska Oil & Gas Cons. Commissior~ Anch0ran,, ARCO Alaska, Inc. is a Subsidiary of AttanticRichfieldCompany el~ el4 - -e I~ · II eg o8 Se 18 · 20 · PLANT NORTH Grid North is Ig°09'55 "Eo~f r~ DRILL I ¥////A SITE : I ~??b N O. 16 VlClNITY MAP ASP ZONE 4 Cond. COORDINATES Z I Y-' 5 929 44~[ £0 X= 720 00~ 06 22 Y= 5 929 586. 48 X= 720 018. 64 SECTION 24 OFFSET WLO NLO I_AT= 70°12'54.9435'' 1227 1505 LONG= 148° 15'52. 8174' CAT= 70012'34. 3627" 1238 1565 LDNG = 148°[3'32. 5019" 23 Y= 5 929. 327. 86 X=. 720 031. 30 Y= 5 929 £69.14 X= 720 044.00 LAT= 7'0° 12'33. 7827" LONG-- 148013'52.184~' LAT'- 70° 12'33.2018" LONG= 148°13'3 L 8655' 1249 1624 .1260 1683 .. CERTIFICATE OF SURVEYOR I HEREBY CERTIFY THAT, AM PROPERLY REGISTERED AND~ E C E IV E[ LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF'' ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION suRw~ ~^D~ s~ ~ o~ U~DE. ~ D,.~CT SU~.V,S,O.. NOV Z .5 ~85 AND ALL DIMENSIONS AND OTHER DETAILS ~E CORRECT. - Alas~ 0il & Gas Cons. Co DAT~ r SURVEYOR LEGEND WLO - WEST LINE OFFSET NLO- NORTH LINE OFFSET ~- CONDUCTORS AS-BUILT THIS SURVEY. ...... :ARCO"o. i i ARCO Alaska., Inc. AS- BUILT DRILL SITE 16 CONDUCTORS LOCATED IN PROTRACTED SECTION 24, TION~ RESE U.M. PREPARED BY LOUNSBURY 8~ ASSOCIATES, INC. 723 W6fh AV~ ANCHORAGE,ALASKA DATE: 10/29/~5 JSCALE: I"= 300' CHKD. BY: G E L FL 13. Bt(.: LHD 85- I01 · CHECK LIST FOR NEW WELL PERMITS Company ~_.~-~ Lease & Well No. ITEM 32PROVE DATE YES NO (1) Fee ~/~c~ ~ 1. Is the permit fee attached .......................................... ~ -- (2) Loc . . (8)' '(% %hru ~3)' '~ 10. (10 and 13) 12. 13. (4) Casg '-K~.~.~. (14 thru 22) (5) BOPE '~,~, 5~.7z-~ (~3 t~ru 28) 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Is well to' be located in a defined pool ............................. ~ Is well located proper distance from property line .................. ~ Is well located proper distance from other wells .................... ~__ Is sufficient undedicated acreage available in this pool . Is well to be deviated and is wellbore plat included ..... · __ IS operator the only affected party ......... i ............ ' ~ Can permit be approved before fifteen-day wait .......... Does operator have a bond in force .................................. ~ Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... ~ Does the well have a unique name and number ......................... Is conductor string provided ........................................ ~ , , Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... ~ . Is enough cement used to circulate on conductor and surface ......... /y~f . Will cement tie in surface and intermediate or production strings ... .~ ,, Will cement cover all known productive horizons ..................... ,,~ Will all casing give adequate safety in collapse, tension and burst.. ~ Is this well to be kicked off from an existing wellbore ............. .. ~,~ Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating - Test to ~-'O ~ . psig .. Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. (6) OTHER ' (~2~' thrU' 3'1) (6) Add: Geolo gQ!: Engineering rev: 01/30/89 6.011 For 29. 30. 31. 32. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed conditions presented Additional requirements ............................................. INITIAL GEO. UNIT ON t OFF POOL CLASS STATUS AREA NO. SHORE , Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. LIS VERIFICATION LISTING FOR: ARCO ALASKA DRILL SITE 16 WELL 23 PRUDHOE BAY Below are the mnemonics used on the ARCO ALASKA INC. Drill Site 16 Well #23 LIS tape. 1 1 1 31 41 41 41 42 42 42 93 93 1 1 1 31 41 41 41 42 42 42 93 93 0 ROPS 1 WBCS 2 RPMS 0 TCDX 0 GRBX 1 GRAX 2 GRCX 0 SNBX 1 RSAX 2 RSCX 1 CSAX 2 CSCX Rate Of Penetration l ft/hr Surface WOBI klbs Surface RPMI rpm CDS Temperature [MWD] I deg F Gamma Ray Base [MWD] I cput Gamma Ray App [ MWD ] ) MWD-API Gamma Ray Cor (MWD)IMWD-API Resistance (SN) Base [MWD] I ohms Resistivity (SN) App [MWD]lohm-m Resistivity (SN) Cor [MWD] I ohm-m Conductivity (SN) App [MWD] Immhos/m Conductivity (SN) Cor [MWD]lmmhos/m t J I t i i t t i I i i I i I i i I i ** reel header ** service name :RGD date :90/07/21 origin :2300 reel name :763TAK continuation# :01 previous reel : comment :TELECO OILFIELD SERVICES PROPRIETARY FIELD TAPE ** tape header ** service name :RGD date :90/07/21 origin :2300 tape name :763TAK continuation # :01 previous tape : comments :RIG NABORS ALASKA 28E ** file header ** file name :763TAK. 001 service name :RGD version# : 1.31 date :90/07/21 maximum length :1024 file type :LO previous file : ** information records ** table type :TOOL MNEM STAT LENG WEIG HEIG GR ALLO 0.000 0.000 0.000 RSN ALLO 72.000 0.000 0.000 DCDS ALLO 360.000 0.000 0.000 ** information records ** table type :CONS MNEM STAT PUNI TUNI VALU BS UNAL IN IN 9.875 I ! ! I ! t I i i I i i i 1 BHT UNAL DEGF DEGF 0 . 000 TD UNAL F F 11995. 000 YEAR UNAL 90.000 MONT UNAL 7 . 000 DAY UNAL 21.000 ** information records ** table type :CONS MNEM STAT PUNI TUNI~ VALU SON UNAL Ri UNAL R2 UNAL R3 UNAL R4 UNAL R5 UNAL R6 UNAL R7 UNAL R8 UNAL HIDE UNAL WN UNAL CN UNAL FN UNAL FL UNAL FL1 UNAL LUL UNAL ENGI UNAL WITN UNAL DFT UNAL LONG UNAL LATI UNAL STAT UNAL COUN UNAL DMF UNAL LMF UNAL PDAT UNAL APIN UNAL OSl UNAL OS2 UNAL OS3 UNAL OS4 UNAL OS5 UNAL OS6 UNAL TLAB UNAL RESISTIVITY/GAMMA/DIRECTIONAL DRILL SITE 16 WELL #23 ARCO ALASKA PRUDHOE BAY ANCHORAGE BROWN/BURTON BORDES ALASKA NORTH SLOPE RKB RKB I I i ! ! J I ! J ! J I J i J ! J J J TN4 TN5 TN6 TN7 TN8 TN9 TN10 TNll TN12 SECT TOWN RANG NATI CONT MSS MFSS MCSS SLAB CLAB CS1 CS2 CS3 BS1 BS2 BS3 HLD RUN LUN OPER LLUN LCC BLI TLI EPD APD EKB EDF EGL TDD TDL CW1 BSD1 CBD1 CBL1 CW2 BSD2 CBD2 UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL UNAL F F F F F F F F F LB/F F F F LB/F F F F F F F F F F F, F LB/F F F F LB/F F F USA NAM STATE COUNTY 10.75 13.50 9.875 INCL 0.000 2300.000 0.000 0.000 0.000 0.000 0.O00 0.000 0.000 70.000 69.000 0.000 11995.000 11995.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 I ! l' i J t t J J ! J J i J ! J ! ! ~ CBL3 UNAL F F 0.000 STEM UNAL DEGF DEGF 0.000 MRT UNAL DEGF DEGF 0.000 DFD UNAL LB/G LB/G 0.000 DFV UNAL S S 0.000 DFPH UNAL 0.000 DFL UNAL C3 C3 0.000 RMFS UNAL OHMM OHMM 0.000 RMS UNAL OHMM OHMM 0.000 RMCS UNAL OHMM OHMM 0.000 MST UNAL DEGF DEGF 0.000 MFST UNAL DEGF DEGF 0.000 MCST UNAL DEGF DEGF 0.000 ** information records ** table type :PRES MNEM OUTP STAT TRAC CODI DEST MODE GRCX GRCX ALLO Ti LLIN 1 NB RSAX RSAX ALLO T2 LLIN 1 GRAD WBCS WBCS ALLO T3 LLIN 1 NB ROPS ROPS ALLO T3 LSPO 1 NB DT DT DISA T3 LLIN 1 SHIF ILD0 ILD DISA T2 LDAS 1 GRAD ILD1 ILD DISA T2 MDAS 1 GRAD TT1 TT1 DISA T3 LLIN 1 SHIF TT2 TT2 DISA T3 LSPO 1 SHIF TT3 TT3 DISA T3 LDAS 1 SHIF TT4 TT4 DISA T3 LGAP 1 SHIF TENS TENS DISA T3 LSPO 1 NB 12 DIIMM DISA TI LLIN NEIT NB 13 DUMM DISA Ti LLIN NEIT NB 14 DUMM DISA Ti LLIN NEIT NB 15 DUMM DISA Ti LLIN NEIT NB 16 DUMM DISA Ti LLIN NEIT NB 17 DUMM DISA T~ LLIN NEIT NB 18 DUMM DISA T1 LLIN NEIT ~ NB 19 DUMM DISA Ti LLIN NEIT NB ** information records ** table type :FILM ** information reCords ** table type :AREA MNEM STAT BEGI END PATT DEST 1 DISA 2 DISA 3 DISA 4 DISA 5 DISA 6 DISA 7 DISA 8 DISA Z1 Z1 Z1 Z1 Z1 Z1 Zl Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 Z1 ** data-format record ** entry blocks type size repr code entry 4 1 66 255 8 4 68 60.000 9 4 65 .liN 12 4 68 -9999.000 0 2 79 0 datum specification blocks WARNING the following table is in LIS Datum Specification Block Sub-Type 0 and the API Type Codes may be Unreliable!!! mnem service service unit api api api api file size spl repr id order # log type class mod no. code DEPT FT 00 000 00 00 0 4 1 68 ROPS 00 000 00 00 0 4 1 68 WBCS 00 000 00 00 0 4 1 68 RPMS 00 000 00 00 0 4 1 68 TCDX 00 000 00 00 0 4 1 68 GRBX 00 000 00 00 0 4 1 68 GRAX 00 000 00 00 0 4 1 68 GRCX 00 000 00 00 0 4 1 68 SNBX 00 000 00 00 0 4 1 68 RSAX 00 000 00 00 0 4 1 68 RSCX 00 000 00 00 0 4 1 68 CSAX 00 000 O0 00 0 4 1 68 CSCX 00 000 00 00 0 4 1 68 INC 00 000 00 00 0 4 1 68 BLAN BLAN BLAN BLAN BLAN BLAN BLAN BLAN process level NEIT NEIT NEIT NEIT NEIT NEIT NEIT NEIT 1 ! I J ! | J J i J J J J ! J J J J J depth = 8920.0000 feet .... 2718.8160 meters ROPS 1.0000 WBCS 1.0000 RPMS 1.0000 GRBX 1.0000 GRAX 1.0000 GRCX 1.0000 RSAX 1.0000 RSCX 1.0000 CSAX 1.0000 INC 1.0000 AZM 1.0000 TVD 1.0000 depth = 9020.0000 feet .... 2749.2960 meters ROPS 76.1700 WBCS 17.7100 RPMS 81.8200 GRBX 219.0400 GRAX 136.2000 GRCX 144.0800 RSAX 3.6900 RSCX 3.5900 CSAX 270.8700 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 9120.0000 feet .... 2779.7760 meters ROPS 88.3800 WBCS 15.7100 RPMS 85.7100 GRBX 224.2900 GRAX 139.7900 GRCX 147.8800 RSAX 4.4700 RSCX 4.3000 CSAX 223.7000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 9220.0000 feet .... 2810.2560 meters ROPS 101.1400 WBCS 16.5900 RPMS 90.0000 GRBX 255.4100 GRAX 161.0800 GRCX 170.4000 RSAX 4.5000 RSCX 4.3400 CSAX 221.9800 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 9320.0000 feet .... 2840.7360 meters ROPS 86.7400 WBCS 12.7500 RPMS 94.7400 GRBX 237.0500 GRAX 148.5200 GRCX 157.1100 RSAX 3.5800 RSCX 3.4800 CSAX 279.5100 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 9420.0000 feet .... 2871.2160 meters ROPS 84.1500 WBCS 10.9600 RPMS 85.7100 GRBX 226.5800 GRAX 141.3600 GRCX 149.5400 RSAX 4.4100 R$CX 4.2500 CSAX 226.5300 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 9520.0000 feet .... 2901.6960 meters ROPS 15.7500 WBCS 39.2600 RPMS 0.0000 GRBX 187.1200 GRAX 114.3700 GRCX 120.9900 RSAX 3.9400 RSCX 3.8200 CSAX 254.0900 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 9620.0000 feet 2932.1760 meters ROPS 110.2200 WBCS 12.9500 RPMS 85.7100 GRBX 224.0600 GRAX 139.6400 GRCX 147.7200 RSAX 4.6500 RSCX 4.5300 CSAX 215.4900 TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX 1.0000 1.0000 1.0000 -9999.0000 0.5300 278.8100 -9999.0000 0.6500 232.3100 125.6000 0.6500 230.6500 127.4000 0.5200 287.5300 129.2000 0.6400 235.0500 125.9900 0.5700 261.8700 '125.6000 0.6700 221.2000 I i I I J ! ) J ! J ! J J ! i J J j J GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC 246.9400 GRAX 155.2800 GRCX 164.2700 4.3300 RSCX 4.2200 CSAX 231.2100 -9999.0000 AZM -9999.0000 TVD -9999.0000 9820.0000 feet .... 2993.1360 meters 109.9500 WBCS 12.4300 RPMS 90.0000 191.6400 GRAX 116.6600 GRCX 125.5700 3.7300 RSCX 3.6500 CSAX 268.1100 -9999.0000 AZM -9999.0000 TVD -9999.0000 9920.0000 feet .... 3023.6160 meters 84.4800 WBCS 13.8600 RPMS 104.3200 197.5500 GRAX 120.6700 GRCX 129.8900 2.9800 RSCX 2.9300 CSAX 335.2900 -9999.0000 AZM -9999.0000 TVD -9999.0000 10020.0000 feet .... 3054.0960 meters 120.4400 WBCS 17.2200 RPMS 94.7400 204.0600 GRAX 125.0900 GRCX 134.6400 2.9300 RSCX 2.8800 CSAX 341.6600 -9999.0000 AZM -9999.0000 TVD -9999.0000 10120.0000 feet .... 3084.5760 meters 116.3300 WBCS 18.4300 RPMS 85.7100 192.6100 GRAX 117.3200 GRCX 126.2800 2.5200 RSCX 2.4900 CSAX 397.0000 -9999.0000 AZM -9999.0000 TVD -9999.0000 10220.0000 feet .... 3115.0560 meters 96.1300 WBCS 15.2000 RPMS 90.0000 196.0300 GRAX 119.6400 GRCX 128.7800 2.5000 RSCX 2.4700 CSAX 399.6900 -9999.0000 AZM -9999.0000 TVD -9999.0000 10320.0000 feet .... 3145.5360 meters 109.9500 WBCS 17.9800 RPMS 0.0000 202.8000 GRAX 124.2400 GRCX 134.5000 3.3400 RSCX 3.2700 CSAX 299.1700 -9999.0000 AZM -9999.0000 TVD -9999.0000 10420.0000 feet .... 3176.0160 meters 117.3900 WBCS 14.1200 RPMS 85.7100 177.2400 GRAX 106.8800 GRCX 115.7000 2.7500 RSCX 2.7000 CSAX 364.2700 -9999.0000 AZM -9999.0000 TVD -9999.0000 SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX 0.6300 237.0700 129.2000 0.5400 274.1300 132.8000 0.4300 341.5400 135.8200 0.4200 347.7800 134.6000 0.3600 401.9700 137.4800 0.3600 404.6000 140.0000 0.4800 305.5000 140.0000 0.4000 369.9100 depth = 10520.0000 feet .... 3206.4960 meters depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX INC depth = ROPS GRBX RSAX 10620.0000 feet .... 3236.9760 meters 74.9800 WBCS 15.0600 RPMS 94.7400 173.4000 GRAX 104.2700 GRCX 112.8800 2.7700 RSCX 2.7300 CSAX 361.2700 -9999.0000 AZM -9999.0000 TVD -9999.0000 10720.0000 feet .... 3267.4560 meters 95.4500 WBCS 16.9500 RPMS 86.5400 410.4700 GRAX 265.3100 GRCX 287.2100 3.9000 RSCX 3.8100 CSAX 256.5000 -9999.0000 AZM -9999.0000 TVD -9999.0000 10820.0000 feet .... 3297.9360 meters 103.6900 WBCS 18.1700 RPMS 0.0000 297.6500 GRAX 188.6700 GRCX 204.2500 3.7000 RSCX 3.6200 CSAX 270.1100 -9999.0000 AZM -9999.0000 TVD -9999.0000 10920.0000 feet .... 3328.4160 meters 48.9100 WBCS 13.7500 RPMS 100.0000 351.4100 GRAX 225.1900 GRCX 243.7800 3.3900 RSCX 3.3200 CSAX 296.0600 -9999.0000 AZM -9999.0000 TVD -9999.0000 11020.0000 feet .... 3358.8960 meters 9.3500 WBCS 49.3300 RPMS 100.0000 338.1800 GRAX 216.2000 GRCX 234.0500 7.2000 RSCX 6.7800 CSAX 139.1800 -9999.0000 AZM -9999.0000 TVD -9999.0000 11120.0000 feet .... 3389.3760 meters 25.1100 WBCS 50.5000 RPMS 100.0000 354.8300 GRAX 227.5100 GRCX 246.3000 10.2500 RSCX 9.6300 CSAX 97.6100 -9999.0000 AZM -9999.0000 TVD -9999.0000 11220.0000 feet .... 3419.8560 meters 35.4000 WBCS 49.9100 RPMS 100.0~00 260.3600 GRAX 163.3400 GRCX 176.8200 11.3400 RSCX 10.6600 CSAX 88.1600 -9999.0000 AZM -9999.0000 TVD -9999.0000 11320.0000 feet .... 3450.3360 meters 31.3700 WBCS 50.5400 RPMS 100.0000 236.1700 GRAX 146.9000 GRCX 159.0300 10.0200 RSCX 9.4200 CSAX 99.8100 TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX 141.8000 0.4000 366.9100 143.6000 0.5600 262.3900 143.6000 0.5400 276.1400 136.4800 0.4900 302.2700 134.6000 1.0400 147.7000 138.2000 1.4800 103.8400 141.8000 1.6400 93.7900 145.4000 1.4500 106.1800 } I ~' I I t ~ ! ! J | i ! j I J i ! t GRBX 380.7300 GRAX 245.1100 GRCX 265.3400 RSAX 6.2300 RSCX 6.0300 CSAX 160.5700 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 11520.0000 feet .... · 3511.2960 meters ROPS 44.0700 WBCS 51.1500 RPMS 100.0000 GRBX 600.5900 GRAX 394.4500 GRCX 427.0200 RSAX 7.4600 RSCX 7.1400 CSAX 133.9700 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 11620.0000 feet .... 3541.7760 meters ROPS 33.9600 WBCS 51.1100 RPMS 100.0000 GRBX 450.0000 GRAX 292.1600 GRCX 316.2900 RSAX 3.6800 RSCX 3.6000 CSAX 271.6300 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 11720.0000 feet .... 3572.2560 meters ROPS 17.2900 WBCS 40.2900 RPMS 100.0000 GRBX 290.9800 GRAX 184.1400 GRCX 198.1900 RSAX 5.2800 RSCX 5.1300 CSAX 189.5200 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 11820.0000 feet .... 3602.7360 meters ROPS 286.1100 WBCS 39.5900 RPMS 100.0000 GRBX 92.7300 GRAX 49.4700 GRCX 53.2400 RSAX 14.6200 RSCX 13.7400 CSAX 68.4000 INC -9999.0000 AZM -9999.0000 TVD -9999.0000 depth = 11920.0000 feet .... 3633.2160 meters ROPS 81.5100 WBCS 37.9000 RPMS 100.0000 GRBX 97.3700 GRAX 52.6200 GRCX 56.6400 RSAX 5.8400 RSCX 5.6700 CSAX 171.5600 INC 49.7000 AZM 149.6000 TVD 9136.0000 ** file trailer ** file name :763TAK. 001 service name :RGD version # : 1.31 date :90/07/21 maximum length :1024 file type :LO next file name : SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX TCDX SNBX CSCX 0.9000 165.7800 150.8000 1.0800 140.0800 152.6000 0.5300 277.7700 148.6800 0.7600 194.8500 154.6100 2.1100 72.7700 158.0000 0.8400 176.7100 PROGRAM: LIS REVISION: 4.1 Start of execution: Mon 2 JLY 90 3:03pm PART NUMBER: W5550-MICRO WELL DATA FILE: C:\WDSDATA\W04428.WDF ECC: 4428.00 COMPANY NAME: ARCO ALASKA INCORPORATED WELL NAME: D.S. 16 - 23 FIELD: LOCATION: Top of Well: Bottom of Well: Level Spacing: 11610.000 12030.000 0.500 NUMBER OF CURVES: 21 DEPTH CAL CHT CNC GR PE RFOC RILD RILM SFT2 SSD SSN TTEN ZCOR ZDEN HRD1 HRD2 LSN SHR SP SPD COMPANY:ARCO ALASKA INCORPORATED WELL:D.S. 16 - 23 FIELD:PRUDHOE BAY COUNTY:NORTH SLOPE STATE:ALASKA TAPE INFORMATION FILE:MAIN .001 FILE INTERVAL: START= 12030.000 END= 11610.000 DEPT GR SPD SP CHT CAL TTEN RILD RILM SSD SHR SFT2 HRD1 LSN SSN CNC ZDEN ZCOR PE RFOC HRD2 12030. 000 12005.000 11980.000 11955.000 11930.000 11905.000 11880.000 11855.000 11830.000 11805.000 11780.000 11755.000 11730.000 11705.000 11680.000 11655.000 -999.250 -999.250 -999.250 0.000 0.200 25.000 0.000 6.777 25.000 48.277 3.225 76.072 40.363 2.596 81.223 40.466 2.277 80.746 47.250 8.894 115.401 43.203 10.486 91.453 33.955 14.326 74.226 39.908 11.546 76.759 62.376 2.886 92.849 -999.250 -999.250 -999.250 15.998 10.073 100.000 15.957 7.899 100.000 17.963 4.118 226.645 18.998 3.416 244.567 18.998 2.833 239.886 18.998 11.697 290.300 18.998 12.332 247.874 18.998 16.143 217.822 18.998 13.162 221.666 18.998 4.039 249.633 -999.250 -999.250 -999 -999.250 -999.250 -999 -999.250 -999.250 -999 -5.068 335.860 6 0.000 0.000 0 0.000 2.000 -0 -27.217 968.827 9 9901.254 0.725 1669 0.000 2.282 0 -82.098 1316.469 9 9583.363 0.623 1597 27.934 2.293 0 -96.715 1207.794 10 8765-969 0.571 1108 28.320 2.408 0 -88.932 1130.479 10 9330.016 0.651 1393 27.831 2.327 0 -40.430 1216.850 10 8602.336 0.624 921 22.352 2.555 0 -117.666 1342.920 10 7933.930 0.514 814 24.686 2.532 0 -153.447 1316.311 10 9720.457 0.550 1224 27.390 2.423 0 -108.328 1228.303 9 10454.801 0.673 1644 26.824 2.329 0 -82.122 1157.261 9 9917.945 0.625 1364 24.424 2.395 0 140.570 18.998 -2.273 1172.553 10 37.683 71.491 7983.375 0.474 648 86.455 253.685 27.386 2.641 0 79.471 19.034 -9.094 1098.395 10 27.695 49.050 7592.383 0.457 603 236.685 395.117 12.359 2.680 0 18.998 8.351 167.565 168.255 5.502 34.180 -18.917 1145.089 11 5017.926 0.312 179 58.158 2.984 -0 204.563 0.000 -42.274 500.000 10 5.791 6.539 9239.094 0.567 1112 39.443 170.513 46.590 2.466 0 210.028 0.000 -80.000 500.000 10 0.200 0.200 8962.656 0.590 1145 36.915 158.247 45.972 2.421 0 .250 .250 .250 .000 .000 .250 .638 .101 .064 .739 .480 .049 .256 .012 .042 .256 .651 .046 .560 .777 .089 .590 .035 .032 .255 .446 .109 ·999 .556 · 115 .844 .486 · 110 .386 .864 .079 .669 .208 .065 .976 .577 .057 .980 .904 .096 .978 .224 .060 -999.250 -999.250 -999.250 4231.863 0.000 0.000 5712.961 1904.394 1.904 6618.898 1819.643 2.699 6210.848 1366.111 3.222 6023.406 1637.984 2.462 6335.074 1083.276 2.697 6548.402 1008.129 3.913 6374.066 1531.208 3.459 6083.004 1898.941 2.279 6057.672 1617.853 2.685 6195.184 848.021 4.501 6132.207 751.821 4.767 6224.098 265.153 8.602 4500.000 1319.816 3.259 4500.000 1376.462 3.017 -999.250 -999.250 12.123 0.000 9.581 2352.365 10.193 2206.424 10.132 1711.307 10.759 2079.725 22.958 1387.054 25.932 1280.399 23.636 1928.092 21.318 2403.881 6.168 2064.348 155.705 1148.944 79.751 1020.589 6.471 417.726 0.200 1734.747 0.200 1736.889 D.S. 16 - 23 DEPT GR SPD SP CHT CAL TTEN RILD RILM SSD SHR SFT2 HRD1 LSN SSN CNC ZDEN ZCOR PE 11630.000 230. 0. 25. 11610.000 -999. -999. -999. WELL DATA FILE: ECC: COMPANY NAME: WELL NAME: FIELD: LOCATION: Top of Well: Bottom of Well: Level Spacing: 293 200 000 250 250 250 0.000 -80.000 0.200 0.000 100.000 0.000 5O0.0O0 0.000 2.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 C:\WDSDATA\W04429.WDF 4429.00 ARCO ALASKA INCORPORATED D.S. 16 - 23 11610.000 12030.000 0.500 6.0 0.0 -0.2 -999.2 -999.2 -999.2 00 00 50 4500.000 0.000 0.000 50 50 50 -999.250 -999.250 -999.250 RFOC HRD2 0.200 0.000 -999.250 -999.250 NUMBER OF CURVES: 21 DEPTH CAL CHT CNC GR PE RFOC RILD RILM SFT2 SSD SSN TTEN ZCOR ZDEN HRD1 HRD2 LSN SHR SP SPD FILE:REPEAT.002 FILE INTERVAL: START= 12030.000 END= 11610.000 DEPT 12030.000 12005.000 11980.000 11955.000 11930.000 GR SPD SP CHT CAL TTEN RILD RILM SSD SHR SFT2 HRD1 LSN SSN CNC ZDEN ZCOR PE -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 0.000 19.004 -19.649 0.200 10.124 0.000 25.000 100.000 0.000 0.000 18.998 -22.212 6.700 7.990 9744.660 25.000 100.000 0.000 42.789 3.125 71.776 35.487 2.638 79.150 20.998 -66.715 4.048 9339.047 225.550 29.930 20.998 -87.819 3.336 8987.879 237.261 28.156 -999.250 -999.250 -999.250 395.465 0.000 2.000 984.709 0.691 2.294 1015.604 0.572 2.337 1018.115 0.596 2.429 -999.250 -999.250 -999.250 6.000 0.000 -0.250 9.638 1611.871 0.059 9.749 1444.667 0.051 10.256 1154.083 0.065 -999.250 -999.250 -999.250 4222.902 0.000 0.000 5743.016 1843.927 2.145 5744.172 1660.022 3.213 5677.738 1349.431 2.964 RFOC HRD2 -999.250 -999.250 12.035 0.000 9.118 2262.038 10.566 2015.554 9.886 1742.942 11905.000 41 2 88 .007 20.998 -94.602 1116.414 .277 2.912 9222.312 0.730 .997 252.070 26.154 2.287 11880.000 59 8 95 .744 20.998 .823 11.624 .077 247.526 -41.690 1202 11367.406 0 23.403 2 .756 .590 .521 11855.000 42.079 20.998 11.000 13.854 85.220 252.750 -81.329 1327 7547.551 0 27.770 2 .510 .467 · 619 11830.000 38.499 20.998 14.260 16.105 71.788 228.764 -81.538 1224 9271.207 0 30.478 2 .461 .629 · 354 11805.000 43 11 80 .792 20.998 -65 .539 12.868 10668 .352 224.080 25 .438 1153 .812 0 .628 2 .656 .651 .329 11780.000 72.782 20.998 -52 3.001 4.127 9473 101.256 263.959 23 .035 1171 .445 0 .444 2 .838 .635 .401 11755.000 138 38 93 .427 20.998 -0 .142 69.297 7742 .454 271.345 27 .358 1122 .098 0 .014 2 .675 .519 .515 11730.000 82 26 262 .891 20.998 0 .287 36.531 7429 .339 418.092 11 · 201 1099 .020 0 .493 2 .380 .426 .650 11705.000 174 5 33 .301 20.998 5 .828 9.229 6754 .817 152.006 49 .369 1109 .336 0 .667 3 .331 .324 · 147 11680.000 205 5 42 .560 20.998 0 .887 6.517 8651 · 279 170.231 41 .796 1001 .617 0 .805 2 .148 .541 .481 11655.000 214.349 0.000 -80 0.200 0.200 8795 37.370 160.110 45 .O00 500 .090 0 .933 2 .O0O .570 .425 D.S. 16 - 23 DEPT 10.256 1511.067 0.023 11630.000 10.782 1373.156 0.242 10.539 641.653 0.037 11610.000 10.566 1338.070 0.053 9.947 1659.859 0.127 9.947 1296.761 0.085 10.464 781.778 0.010 10.692 610.062 0.040 10.771 228.573 0.182 11.081 985.967 0.063 11.081 1072.564 0.050 5974.301 1745.166 1.872 6250.242 1662.395 3.024 6505.895 818.377 4.603 6288.793 1587.464 2.651 6135.074 1991.507 2.456 6177.016 1541.200 2.595 6118.691 981.885 3.839 6061.484 753.892 5.355 6223.977 329.612 8.122 6005.348 1206.000 3.568 4500.000 1332.714 3.231 GR SPD SP CHT CAL TTEN RILD RILM SSD SHR SFT2 HRD1 LSN SSN CNC ZDEN ZCOR PE 234.481 0.000 -80.000 0.200 0.200 0.000 62.061 227.199 36.586 500.000 0.000 2.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 6.000 0.000 -0.250 -999.250 -999.250 -999.250 WELL DATA FILE: C:\WDSDATA\W04430 ECC: 4430.00 · WDF COMPANY NAME: ARCO ALASKA INCORPORATED WELL NAME: D.S. 16 - 23 4500.000 0.000 0.000 -999.250 -999.250 -999.250 10.296 2109.839 22.004 2077.640 27.294 1088.794 23.657 1968.879 20.904 2429.207 4.948 1898.716 128.630 1284.471 46.693 1037.996 6.298 480.659 7.793 1539.632 0.200 1690.562 RFOC HRD2 0.200 0.000 -999.250 -999.250 FIELD: LOCATION: Top of Well: Bottom of Well: Level Spacing: 11610.000 12030.000 0.500 NUMBER OF CURVES: 21 DEPTH CAL CHT CNC GR PE RFOC RILD RILM SFT2 SSD SSN TTEN ZCOR ZDEN HRD1 SHR HRD2 SP LSN SPD FILE:REPEAT.002 FILE INTERVAL: START= 12030.000 END= 11610.000 DEPT 12030.000 12005.000 11980.000 11955.000 11930.000 11905.000 11880.000 11855.000 11830.000 11805.000 GR SPD SP CHT CAL TTEN RILD RILM SSD SHR SFT2 HRD1 LSN SSN CNC ZDEN ZCOR PE -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 0.000 22.404 -10.338 337.790 6.000 0.200 10.279 0.000 0.000 0.000 25.000 100.000 0.000 2.000 -0.250 0.000 21.998 1.781 6.809 7.693 10142.027 25.000 100.000 0.000 888.206 0.717 2.268 9.535 1751.669 0.073 45.880 21.998 -57.736 950.895 9.844 3.011 4.303 9535.750 0.643 1604.911 73.637 215.876 27.354 2.287 0.043 36.702 21.998 -79.701 979.326 10.153 2.663 3.328 9488.125 0.686 1509.244 79.470 225.217 26.173 2.311 0.050 37.975 21.998 -73.493 1155.332 10.116 2.325 2.806 9464.121 0.709 1426.675 79.111 227.511 26.679 2.342 0.061 83.489 21.998 -21.436 1163.352 10.301 8.746 11.696 8844.406 0.619 1003.482 92.783 241.501 23.396 2.517 0.090 41.222 21.998 -86.125 1238.310 10.393 10.895 13.505 8821.539 0.540 948.421 70.599 223.816 30.274 2.511 0.086 41.822 21.998 -88.256 1192.893 10.256 14.282 16.197 10169.809 0.579 1420.220 72.402 220.004 28.657 2.385 0.121 40.365 21.998 -76.785 1148.734 10.154 11.469 12.875 9715.312 0.681 1464.722 85.706 242.426 26.108 2.341 0.076 -999.250 -999.250 -999.250 4249.434 0.000 O.00O 5708.469 1990.226 1.959 5781.984 1817.269 2.525 5728.945 1731.773 2.183 6263.992 1705.561 2.015 6239.715 1187.343 2.742 6418.734 1218.228 3.572 6250.363 1691.375 3.130 6131.543 1712.810 2.216 RFOC HRD2 -999.250 -999.250 12.013 0.000 9.920 2483.432 10.429 2215.223 9.904 2143.551 10.119 2004.662 20.088 1508.521 29.043 1491.762 23.291 2167.503 21.194 2131.904 11780.000 102 2 97 .800 21.998 -57. .872 4.090 9152. .716 271.423 25. 687 754 495 11755.000 139.919 21.998 1. 37.632 64.624 8052. 95.637 257.268 24. 145 621 441 11730.000 82.388 21.998 6. 27.097 36.999 7117. 264.897 429.421 11. 029 469 806 11705.000 158.285 21.998 5. 5.906 6.543 5381. 36.273 160.194 48. 800 141 228 11680.000 209.837 21.998 5. 5.731 6.574 8559. 41.492 176.990 45. 539 648 616 11655.000 213 0 37 .270 0.000 -80. .200 0.200 9165. .668 160.652 45. 0O0 332 605 D.S. 16 - 23 DEPT 11630.000 1160.868 0.618 2.385 1142.308 0.504 2.631 11610.000 1372.159 0.428 2.606 1127.385 0.318 2.967 1130.670 0.551 2.490 500.000 0.581 2.445 10.050 1248.160 0.058 10.463 708.833 0.080 10.667 572.468 -0.003 11.503 216.044 -0.024 11.184 965.161 0.060 11.081 1128.606 0.083 6198.684 1474.483 2.746 6209.594 892.502 4.048 6873.711 764.913 5.315 6279.652 297.015 8.355 6404.582 1173.381 3.443 4500.000 1357.759 3.112 GR SPD SP CHT CAL TTEN RILD RILM SSD SHR SFT2 HRD1 LSN SSN CNC ZDEN ZCOR PE 6.000 0.000 -0.250 2!0.046 0.000 -80.000 0.200 0.200 0.000 40.933 181.547 48.570 500.000 0.000 2.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 End of execution: Mon 2 JLY 90 3:03pm Elapsed execution time = 14.61 seconds. SYSTEM RETURN CODE = 0 -999.250 -999.250 -999.250 4500.000 0.000 0.000 -999.250 -999.250 -999.250 5.032 1883.702 134.029 1152.957 394.512 1032.124 6.823 467.030 7.856 1501.564 0.200 1752.024 RFOC HRD2 0.200 0.000 -999.250 -999.250