Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout191-054THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE NOVEMBER 2, 2000 E E PL E W M A TE R IA L U N D E TH IS M A R K ER C:LORIkMFILM.~ R lc-apfm lOjan95 LOCATION CLEARANCE State of Alaska OIL AND GAS CONSERVATION COMMISSION REPORT Memorandum To File: API No. Opera tor' ~nd Date ~0 ~ ~ / Note casing size, wt, depth, ~t vol, & procedure. Liner: ~ -- Perf intervals - tops:-- Review the well file, and comment on plugging, well head status, and location clearance - provide loc. clea~. Well head cut off: Marker post or plate: Location Clearance: code. Code MEMORAND State Alaska Alaska Oil and Gas Conservation Uommission TO: ' David J~ Chairman--"- DATE:' March 7, 1994 THRU: Blair Wondzell, ?/e/,~q FILE NO: P. I. Supervisor GF9LCGBD.doc FROM: John Spaulding,~,.~A~ SUBJECT: Petroleum Inspector Oil Spill Arco PBU DS 4 well 34 Prudhoe Oil Pool Monday March 7,1994: I traveled to Arco PBU DS 4 well 34 to observe an oil spill caused from a 1/4" diameter hole in well 34's flow line. I spoke to Roy Wells Arco FS-2 drill site supervisor about the spill. He informed me that the leak was discovered at about 11:52 AM. The spill was reported to be approximately 150 bbls., 7 bbls. crude, 137 bbls. produced water, 150mscf gas, the well has a 93% water cut and was flowing at 260 psi. The line diameter was 6" and approximately 1/2 mile long, the leak occurred about 600' from the well in a straight section of line 4" from a weld. The safety valve system was in the normal operating position, and the sub surface safety valve was in the well and fully operational. It is fairly evident the line leak was small enough not to cause a pressure drop that would activate the low pressure sensor. I ANALOG .-~ rdETER RATE TRENDING - 1 HOUR F'.LOT .... ' .... I"1~# CU~UT ---PLOT= "'-'~:- N~ ~--- ___._~'-" ~....~'~-~-.~-~~ ,~ ~p~:t~.~o~.~,~ .~ v~u~_ - ~iNE PRESSURE (P$~: > ~?. E~ ~. ~ ~x.~. 94 . . . ~5 ~4___~/,.,..__ . ~~//~.__~,1,~~/~.~ il'_ P 157 68- - 1X8 ,/ PSIS 11 ~ 111,4~ 11 ~ 5~ XB ~0~ ~1~~ l~ ~HIFt t, EY.S ~ET MIN AND MAX TO -1 TO ~U~N ON "PRETTY' SCALIU~___ .... TREND ~0~ '~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CuMMISSlON WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED E~x SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 85-89 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22160 4. Location of well at surface ~' ~'..,;., - .,' ' ,-: ....... ~ 9. Unit or Lease Name 1263' NSL, 181' EWL, SEC. 26, T11N, R15E, UM :~::~': i ~ll~NlSi ~ Prudhoe Bay Unit At Top Producing Interval ......;~ 1321' SNL, 1320' WEL, SEC. 25, T11N, R15E, UM ~ ~> : ' DS 4-34 At Total Depth ~' Prudhoe Bay Field/Prudhoe Bay Pool 1273' SNL, 1159' WEL, SEC. 25, T11N, R15E, UM 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 64' I ADL 28324 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. o¢ Aband. I15. Water Depth, if offshore 116. No. el Completions I 9/27/91 10/16/91 10/18/91 N/A feet MSL I Zero 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 13840'MD/8793'TVD 13035'MD YEs [] NO []! N/Afeet MD ! 1900' 22. Type Electric or Other Logs Run Run #1 GR/DIL/SP/CNL/BHC Run #2 GR/DIL/SP/BHC 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94.5# Cond. Surface 110' 30" 8 cu yds Poleset 10-3/4" 45.5# J-55 Surface 3970' 13-1/2" 2522 cu ft 7-5/8" 29. 7# L-80 Surface 13618' 8748' 1608 cu ft 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None None 26. ACID, FRACTURE, CEMENT SQUEEZe, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIALUSED 13035'- 13543 62 CU ft Class "G" Cement 13543'- 13 735' 48 cuft Class "G" Cement 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) None Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~GAS-OIL RATIO TEST PERIOD I~ Flow Tubing Casing Pressure CALCULATED..~ OIL-BBL GAS-MCF WATER-BBL DIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. REE£1VED OcT - 6 1992 Alaska 0il Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MN:IKERS FORMATION TESTS ............ , ......... NAME .......... Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. ........... Victor 13666' 8744' RECEIVED Alaska 0il & Gas Cons. Anchorage 31 .' LIST OF ATTACHMENTs ..................... ......... , ,, 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ///J~ .~ TitleDriilJngEngineerSupervisor Date ................ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 2.8: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: DS 4-34 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50-029-22160 PERMIT: APPROVAL: ACCEPT: 09/27/91 04:09 SPUD: 09/27/91 11:09 RELEASE: 10/19/91 09:10 OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NONE 09/27/91 ( 1) TD: 110' ( 110) 09/28/91 (2) TD: 1114' (1004) 09/29/91 (3) TD: 3002' (1888) 09/30/91 ( 4) TD: 3970' ( 968) 10/01/91 ( 5) TD: 3985' ( 15) 10/02/91 (6) TD: 6338' (2353) 10/03/91 (7) TD: 6527' ( 189) 10/04/91 (8) TD: 7960' (1433) 10/05/91 (9) TD: 8352' ( 392) N/U DIVERTER. MW: 0.0 VIS: 0 RIG MOVE F/ DS 4-35 TO DS 4-34. RIG ACCEPTED @ 04:30 HRS, 9/27/91. N/U DIVERTER. DRLG. MW: 9.0 VIS:300 R/U. N/U DIVERTER. TEST SAME. RIH W/ BHA #1. SPUD WELL @ 11:30 HRS, 9/27/91. DRLG F/ 101'-475'. POOH. CHANGE MWD. RIH. DRLG F/ 475'-1114' DRLG. 10-3/4"@ 3955' MW: 9.2 VIS:320 DRLG F/ 1114;-2533'. CIRC. SHORT TRIP TO 500' REAM F/ 2457'-2533'. DRLG F/ 2533'-3002'. CIRC. 10-3/4"@ 3955' MW: 9.5 VIS:400 DRLG F/ 3002'-3970' CBU. 32 STD SHORT TRIP. CBU. POOH. RIH W/ 10-3/4" CSG. CIRC.0 DRLG. 10-3/4"@ 3955' MW: 8.3 VIS: 0 CIRC. R/U DOWELL. PUMP 100 BBLS WATER, 1300 SX ASIII W/ .12% R7 @ 12.07 PPG, 1.94 YIELD. PUMP 350 SX 'G' CMT W/ 2% CACL, .2% D46 @ 15.8 PPG, 1.16 YIELD. DISP W/ 372 BBLS MUD. BUMP PLUG W/ 2000 PSI. TOP JOB W/ 255 SX ASI @ 15.7 PPG, .936 YIELD. R/D DOWELL. N/D DIVERTER. N/U SPOOL, BOPE. TEST BOPE. RIH. TAG CMT @ 3828'. CIRC. TEST CSG. DRLG PLUGS, CMT TO 3947' CIRC TEST CSG DRLG CMT, FS @ 3955' · · , 15' NEW HOLE TO 398~'. CBU. PERFORM LOT (13.2 PPG EMW). DRLG. 10-3/4"@ 3955' MW: 9.4 VIS: 46 DRLG F/ 3985'-5488' CBU. SHORT TRIP TO SHOE. CBU. DRLG F/ 5488'-6338' RIH. 10-3/4"@ 3955' MW: 9.5 VIS: 49 DRLG F/ 6338'-6527'. CBU. POOH. RIH. TAG FILL @ 3539' WASH TO 3979'. CBU. WASH & REAM F/ 3979'-4600'. CIRC. REAM TO 5456' CIRC. WASH TO BTM. DRLG. 10-3/4"@ 3955' MW:10.0 VIS: 50 REAM TO BTM. DRLG F/ 6527'-7503' CIRC. 30 STD SHORT TRIP. DRLG F/ 7503'- 7960'. RIH. 10-3/4"@ 3955' MW:10.0 VIS: 58 DRLG F/ 7690'-8098' CIRC. POOH. RIH. DRLG F/ 8098'-8352' CIRC. POOH. RIH. RECEIVED JUN 1 8 t992 Alaska OJJ & Gas Cons. Commission Anchorage WELL : DS 4-34 OPERATION: RIG : NABORS 28E PAGE: 2 10/06/91 (10) TD: 9828' (1476) 10/07/91 (11) TD:10121' ( 293) 10/08/91 (12) TD:l1316' (1195) DRLG. 10-3/4"@ 3955' MW:10.2 VIS: 47 DRLG F/ 8352'-9606'. CIRC. 12 STDS SHORT TRIP. DRLG F/ 9606'-9828' DRLG. 10-3/4"@ 3955' MW:10.1 VIS: 46 DRLG F/ 9826'-9864' CIRC. POOH. RIH. REAM F/ 9796'-9864' DRLG ~/ 9864'- 10121' DRLG. 10-3/4"@ 3955' MW:10.1 VIS: 48 DRLG F/ 10121'-11316' CIRC. SHORT TRIP 16 STDS. 10/09/91 (13) TD:12549' (1233) DRLG. DRLG F/ 11316'-12549' 10-3/4"@ 3955' MW:10.1 VIS: 52 10/10/91 (14) TD:13480' ( 931) 10/11/91 (15) TD:13638' ( 158) 10/12/91 (16) TD:13638' ( 0) 10/13/91 (17) TD:13638' ( 0) 10/14/91 (18) TD:13638' ( 0) 10/15/91 (19) TD:13674' ( 36) 10/16/91 (20) TD:13840' ( 166) DRLG. 10-3/4"@ 3955' MW:10.2 VIS: 48 DRLG F/-12549'-12674' CIRC. 15 STD SHORT TRIP. DRLG F/ 12674'-13480' REAM TIGHT NOLE. 10-3/4"@ 3955' MW:10.2 VIS: 49 DRLG F/ 13460'-13638' CIRC. SHORT TRIP TO SHOE. RIH TO 13602'. WASH & REAM ~/ 13602'-13838' POOH. 10-3/4"@ 3955' MW:10.5 VIS: 58 REAM ~/ 13359'-13638'. CIRDC. 40 STD SHORT TRIP. REAM F/ 13321'-13638'. CIRC. 12 STD SHORT TRIP. CIRC. SPOT 100 BBLS 12.7 PPG PILL ON BTM. POOH. CIRC. 10-3/4"@ 3955' MW:10.5 VIS: 48 POOH. L/D BHA. TEST BOPE. R/U TORQUE TURN. RIH W/ 7-5/8" CSG TO SHOE. CIRC. RIH TO 7800'. CIRC. RIH TO 10000' CIRC. RIH. "@13618' MW:10.5 VIS: 46 CIRC. RIH W/ 7-5/8" CSG TO 13619'. CIRC. CMT CSG. N/D BOPE. SET SLIPS. N/U BOPE. TEST BOPE. P/U KELLY, BHA. RIH. CIRC. "@13618' MW: 9.6 VIS: 44 RIH TO 13323'. CBU. DRLG CMT F/ 13380'-13500'. CIRC. DRLG CMT F/ 135Q.0'- 13535' CIRC. TEST 7-5/8" CSG. DRLG FC, CMT TO 13608'. CIRC. TEST CSG. DRLG CMT, FS, 10' NEW HOLE TO 13648'. CBU. PERFORM FIT (12.5 PPG EMW). DRLG F/ 13648'-13674' TIGHT HOLE @ 13640' PULL INTO SHOE. CIRC & RAISE MUD W~ TO 9.8 PPG. POOH. "@13618' MW: 9.8 VIS: 48 POOH TO SHOE. RAISE MUD WT TO 9.8 PPG. REAM F/ 13618'-13689'. DRLG F/ 13674'-13840'. TD WELL @ 04:00 HRS, 10/16/91. CBU. SHORT TRIP TO SHOE. CIRC. WELL : DS 4-34 OPERATION: RIG : NABORS 28E PAGE: 3 10/17/91 (21) TD:13840' ( 0) 10/18/91 (22) TD:13276' ( 0) 10/19/91 (23) TD:13276 PB: 0 10/20/91 (24) TD:13276 PB:13276 POOH. "@13618' MW: 9.8 VIS: 53 POOH. R/U ATLAS. LOG RUN #1: GR/DIL/SP/CNL/BHC. LOG RUN #2: GR/DIL/SP/BHC R/D ATLAS. RIH. CIRC. POOH. POOH. "@13618' MW: 9.8 VIS: 52 POOH. R/U SWS. RUN GYRO. R/D SWS. RIH W/ PLUG CATCHER, MULE SHOE. POOH. RIH W/ EZSV. SET PLUG. CIRC. SET EZSV @ 13543'. PUMP 6 BBLS WATER, 60 BBLS MUD, 8.5 BBLS CMT BELOW EZSV, 11 BBLS CMT ON TOP OF EZSV. CIRC. POOH 6 STDS. POOH. N/U TREE. "@13618' MW: 8.5 Seawater POOH. L/D CMT HD. RIH W/ BIT. CIRC TAG CMT @ 13035'. CBU. POOH. L/D DP RIH TO 2180' DI~P W/ DIESEL FOR F/P. POOH. N/D BOPE. N/U TREE. RIG RELEASED @ 09:00 HRS. "@13618' MW: 8.5 Seawater NU TREE. FRZ PROTECT W/DIESEL. RELEASE RIG @ 0900 HRS. 10-19-91. SIGNATURE: (drilling superintendent) DATE: SUB - S URFA CE DIRECTIONAL SURVEY i-~ UIDANCE ~ ONTINUOUS r'fl OOL Company ARCO ALASKA, INC. Well Name D.S. 4-34(1263'FSL,181'FWL,SEC 26,T11N,R15E/ Field/Location PRUDHOE BAY, NORTH SLOPE, ALASKA Job Reference No. 75106 Logged By: M. MCBRIDE R/CEIVE~D JUN 1 8 !~92 Alaska Oil & Gas Coils. Commission '_AnchOrage Date 17-0CT- 1991 Computed By' J. KOHRING * SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA SURVEY DATE: 17-0CT-1991 METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION: ENGINEER: M.MCBRIDE TANGENTIAL- Averaged deviation and azimuth LINEAR HORIZ, DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 73 DEG 43 MIN EAST COMPUTATION DATE: 09-JAN-92 PAGE 1 ARCO ALASKA, INC. D.$. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 17-0CT-1991 KELLY BUSHING ELEVATION: 53.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG 0.00 100.00 lO0 200.00 199 300.00 299 400.00 399 500.00 499 600.00 599 700.00 699 800.00 799 900.00 899 0 O0 -53.00 0 0 N 0 0 E O0 47.00 0 33 N 21 34 E 99 146.99 0 42 N 28 2 E 99 246.99 0 36 N 14 33 E 98 346.98 0 58 N 22 59 E 96 446.96 1 12 N 35 8 E 91 546.91 2 33 N 61 22 E 75 646.75 3 48 N 69 3 E 47 746.47 4 46 N 72 56 E 08 846.08 5 23 N 79 2i E 0 O0 0 05 0 71 1 41 2 13 3 51 6 35 11 95 19 4a 28 22 0.00 0.25 0.11 0.33 0.82 0.46 1 .71 1 .27 0.82 1 .26 0.00 N 0.07 N 0 98 N 1 98 N 3 30 N 4 g3 N 6 88 N 9 13 ~' 11 13 0 O0 E 0 0 0 1 2 9 62 N 16 75 N 25 0.00 N 0 0 E 03 E 0.08 N 21 37 E 45 E 1.08 N 24 47 E 89 E 2 17 N 24 15 E 25 E 3 53 N 20 42 E 22 E 5 41 N 2,o, 12 E 61 E 8 28 N 33 z~g E 75 E 13 38 N 46 59 E 86 E 20 47 N 55 26 E 39 E 28 87 N 6~ 34 E 1000.00 998.56 945.56 6 12 N 83 42 E 1100.00 1097.81 1044.81 7 47 N 83 7 E 50 1200.00 1196.72 1143.72 8 59 N 80 58 E 64 1300.00 1295.36 1242.36 10 12 N 80 15 E 81 1400.00 1393.48 1340.48 12 9 N 79 25 E 100 1500.00 1490.91 1437.91 13 30 N 77 54 E 122 1600.00 1588.17 1535.17 13 28 N 76 14 E 145 1700.00 1685.26 1632.26 14 26 N 75 42 E 169 1800.00 1781.85 1728.85 15 32 N 75 38 E 195 1900.00 1877.80 1824.80 17 31 N 72 39 E 223 38 26 29 81 12 28 73 95 87 70 87 0 89 1 04 0 58 1 98 2 83 0 17 0 30 1 27 1.32 3.81 15.12 N 35 44 E 38.53 N 66 54 E 16.51 N 47 57 E 50.36 N 70 51 E 18.56 N 62 09 E 64.81 N 73 21 E 21.29 N 78 30 E B1.14 N 74 47 E 24.60 N 97 28 E 100.35 N 75 49 E 29.07 N 119 36 E 122.85 N 76 19 E 34.30 N 142 03 E 146.11 N 76 25 E 40.11 N 165 25 E 170.05 N 76 21 E 46.47 N 190.31 E 195.90 N 76 17 E 54.04 N 217.44 E 224.05 N 76 3 E 2000.00 1971.66 1918.66 23 25 N 69 1 E 258.15 2100.00 2061.59 2008 59 27 3 N 69 17 E 301.68 2200.00 2150.51 2097 51 27 20 N 70 0 E 347.31 2300.00 2239.39 2186 39 27 8 N 68 19 E 392.99 2400.00 2328.48 2275 48 27 1 N 68 41 E 438.22 2500.00 2417.48 2364 48 27 14 N 69 38 E 483.68 2600.00 2506.33 2453 33 27 23 N 70 40 E 529.47 2700.00 2595.00 2542 O0 27 54 N 70 26 E 575.65 2800.00 2682.56 2629.56 29 58 N 69 32 E 623.82 2900.00 2768.05 2715.05 32 0 N 71 32 E 675.61 7.65 0.62 0.33 0.69 0.44 0.53 0.40 1 .98 3.59 1 .01 65.56 N 249.78 E 258.25 N 75 18 E 81.19 N 290.57 E 301.70 N 74 23 E 97.05 N 333.48 E 347.31 N 73 46 E 113.38 N 376.29 E 393.00 N 73 14 E 130.06 N 418.54 E 438.28 N 72 44 E 146.30 N 461.16 E 483.81 N 72 24 E 161.87 h 504.31 E 529.65 N 72 12 E 177.11 N 547.97 E 575.88 N 72 5 E 193.94 N 593.24 E 624.13 N 71 54 E 211.05 N 642.19 E 675.98 N 71 48 E 3000.00 2852 26 2799.26 33 54 N 72 22 E 729 51 3100.00 2932 3200.00 3006 3300.0O 3O78 3400.00 3150 3500.00 3218 3600.00 3283 3700,00 3347 3800.00 3408 3900.00 3467 09 2879.09 39 47 N 74 4 E 789 63 05 2953.05 43 33 N 74 29 E 856 91 48 3025.48 43 49 N 73 45 E 925 84 12 3097.12 44 59 N 73 47 E 995 61 38 3165.38 48 32 N 74 52 E 1068 66 74 3230.74 49 40 N 74 3 E 1144.33 65 3294.65 51 18 N 73 9 E 1221.24 98 3355.98 52 55 N 73 0 E 1300.21 57 3414.57 55 30 N 75 0 E 1381.23 5.56 6.25 0.45 1 .55 3.55 1 .65 1.15 1 .77 1 .71 2.24 227.76 N 693.47 E 729.91 N 71 49 E 244.92 N 751.09 E 790.01 N 71 56 E 263.15 N 815.85 E 857.24 N 72 7 E 281.78 N 882.23 E 926.13 N 72 17 E 301.53 N 949.14 E 995.88 N 72 23 E 321.19 N 1019.50 E 1068.90 N 72 31 E 341.27 N 1092.47 E 1144.53 N 72 39 E 363.02 N 1166.24 E 1221.43 N 72 43 E 386.14 N 1241.76 E 1300.41 N 72 44 E 408.55 N 1319.61 E 1381.41 N 72 48 E ) ARCO ALASKA, INC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 09-JAN-92 PAGE 2 DATE OF SURVEY: 17-0CT-1991 KELLY BUSHING ELEVATION: 53.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE ~EASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMU}~ DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET FEET FEET FEET DEG MIh N 75 25 E 1463.89 N 73 42 E 1546.71 N 72 51 E 1629.87 N 73 15 E 1713.37 N 71 42 E 1796.86 N 71 25 E 1879.93 N 71 23 E 1962.19 N 71 14 E 2044.6~ N 71 21 E 2128.85 N 71 7 E 2212.85 N 70 43 E 2296.66 N 70 2 E 2381.20 N 69 51 E 2466.44 N 69 50 E 2551.85 N 69 31 E 2637.31 N 69 28 E 2722.82 4000.00 3523 80 3470.80 55 57 4100.00 3579 82 3526.82 56 4 4200.00 3635 34 3582.34 56 28 4300.00 3690 36 3637.36 56 41 4400.00 3745 36 3692.36 56 30 4500.00 3800 95 3747.95 56 1 4600.00 3857 71 3804.71 55 8 4700.00 3914.21 3861.21 56 41 4800.00 3967.98 3914.98 57 35 4900.00 4022.12 3969.12 56 56 ~ 5000. O0 4076.53 4023 . 53 57 5 ~ 5100.00 4129.68 4076.68 58 32 ~' 5200 · O0 4181.66 4128.66 58 49 C) E~j~. 00 4233.36 4180.36 58 57 '~: C._. 5,"11~'00 4284.94 4231.94 58 59 j~ ~ ~.00 4336.39 4283.39 59 10 '"' ~-~---~ C:'~ ~ ~ O0 4387.86 4334.86 58 39 O0 4440 66 4387 66 57 52 N 69 32 E 2808.32 N 70 7 E 2893.05 ~J~O.O0 4493.30 4440.30 58 30 N 71 6 E 2977.93 00.00 4597.82 4544.82 58 42 N 72 15 E 3148 37 ; 00 4850.33 4597.33 57 51 N 72 50 E 3233 45 O0 4703.97 4650.97 57 24 N 73 23 E 3317 85 ~"~0.00 4758.46 4705.46 56 42 N 73 41 E 3401 69 6400.00 4813.32 4760.32 57 3 N 74 22 E 3485 30 6500.00 4866.68 4813.68 58 1 N 76 38 E 3569 81 6600.00 4920.00 4867.00 57 31 N 76 40 E 3654 29 6700.00 4973.79 4920.79 57 34 N 76 56 E 3738.47 6800.00 5027.62 4974.62 57 18 N 77 9 E 3822.61 6900.00 5081.78 5028.78 56 51 N 76 51 E 3906.52 7000.00 5136.69 5083.69 56 35 7100.00 5191.35 5138.35 57 28 7200.00 5244.80 5191.80 57 46 7300.00 5297.87 5244 87 58 14 7400.00 5350.33 5297 33 58 22 7500.00 5402.47 5349 47 58 38 7600.00 5454.89 5401 89 57 55 7700.00 5508.14 5455 14 57 54 7800.00 5561.24 5508 24 57 49 7900.00 5614.94 5561 94 57 22 N 75 26 E 3990.03 N 75 1 E 4073.74 N 75 16 E 4158.23 N 73 38 E 4242.97 N 73 41 E 4328.10 N 73 46 E 4413.43 N 72 27 E 4498.58 N 72 54 E 4583.21 N 73 21 E 4667.95 N 73 38 E 4752.31 DEG/IO0 0 51 2 23 0 48 0 21 1 64 0 89 0.53 3.68 0.56 1.13 0.60 0.35 0.27 0.32 0.06 1.15 0.79 2.29 0.23 0.33 1.28 0.65 0.06 2.74 0.65 0.17 0.81 0.84 1.51 0 53 1 30 0 62 1 12 0 46 0 33 1 11 0 70 0 46' 1 24 429 49 N 1399 61 E 1464.03 N 72 56 E 451 475 499 524 551 577 603 63O 657 15 N 1479 56 E 1546.81 N 73 3 E 39 N 1559 12 E 1629.99 N 73 3 E 74 N 1638 99 E 1713 49 N 73 3 E 64 N 1718 70 E 1797 O0 N 73 1 E 10 N 1797 51 E 1880 09 N 72 57 E 38 N 1875 53 E 1962 39 N 72 53 E 84 N 1953.68 E 20~4 87 N 72 49 E 86 N 2033.54 E 2129 t5 N 72 46 E gl N 2113.14 E 2213 19 N 72 ~2 E 685.28 N 2192 46 E 2297 06 N 72 39 E 713.91 N 2272 17 E 2381 69 N 72 33 E 743.23 N 2352 41 E 2467 03 N 72 28 E 772.7t N 2432 77 E 2552 54 N 72 23 E 802.45 N 2513 12 E 2638 12 N 72 17 E 832,52 N 2593 42 E 2723 77 N 72 12 E 862.54 N 2673 73 E 2809.42 N 72 7 E 891.91 N 2753 41 E 2894.27 N 72 3 E 920.32 N 2833.55 E 2979.26 N 72 0 E 946.86 N 2914.45 E 3064.40 N 72 0 E 972.98 N 2995.73 E 3149.77 N 72 0 E 998 57 N 3076.89 E 3234,87 N 72 1 E 1023 1046 1070 1090 1110 1129 1148 1167 05 N 3157.66 E 3319.25 N 72 3 E 80 N 3238 07 E 3403 07 N 72 5 E 05 N 3318 38 E 3486 64 N 72 8 E 88 N 3400 34 E 3571 04 N 72 !3 E 38 N 3482 66 E 3655 39 N 72 19 E 59 N 3564 74 E 3739 43 N 72 25 E 50 N 3646 87 E 3823 44 N 72 31 E 20 N 3728 83 E 3907 24 N 72 37 E 1187.46 N 3809.91 E 3990.67 N 72 41 E 1208.66 N 3890.92 E 4074.32 N 72 45 E 1230 44 N 3972.58 E 4158.77 N 72 47 E 1253 21 N 4054 22 E 4243 49 N 72 49 E 1277 18 N 4135 90 E 4328 61 N 72 50 E 1301 10 N 4217 81 E 4413 93 N 72 51 E 1325 74 N 4299 32 E 4499 09 N 72 52 E 1351 02 N 4380 10 E 4583 73 N 72 51 E 1375 61 N 4461 20 E 4668 47 N 72 52 E 1399 65 N 4542 06 E 4752 82 N 72 52 E COMPUTATION DATE: 09-JAN-92 PAGE 3 ARCO ALASKA, INC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY= 17-0CT-1991 KELLY BUSHING ELEVATION: 53.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG 8000.00 5668.57 5615.57 57 22 N 73 57 E 4836.71 8100.00 5722.55 5669.55 57 36 N 74 16 E 4920.88 8200.00 5776.57 5723.57 56 59 N 74 38 E 5005.03 8300.00 5831.03 5778.03 57 4 N 75 3 E 5088.88 8400.00 5885.79 5832.79 56 36 N 75 1 E 5172.53 8500.00 5940.54 5887.54 57 5 N 75 30 E 5256.18 8600.00 5994.90 5941,90 56 58 ~ 75 48 E 5340.07 8700.00 6049.63 5996.63 56 55 N 75 2 E 5423.72 8800.00 6103.43 6050,41 57 50 K 73 28 E 5508.02 8900.00 6156.59 6103.59 57 47 N 73 13 E 5592.71 1.06 1423.25 N 4623.09 E 4837.21 N 72 53 E 0.84 1446.25 N 4704.07 E 4921.37 N 72 55 E 0.45 1468.84 N 4785 13 E 5005.50 N 72 56 E 0.78 t490.75 N 4866 09 E 5089 32 N 72 58 E 0.22 1512.38 N 4946 92 E 5172 94 N 73 0 E 0.87 1533.7t N 5027 83 E 5256 55 N 73 2 E 0.78 1554.46 N 5109 17 E 5340 40 N 73 5 E 2.35 1575.27 N 5190 23 E 5424 01 N 73 7 E 0.72 1598.59 N 5271 24 E 5508 3~ N 73 8 E 0.73 1622.90 N 5352 36 E 5593 O0 N 73 8 E 9000.00 6209.79 6156.79 58 8 N 73 18 E 5677.38 9100.00 6261.64 6208.64 59 3 N 73 32 E 5762.88 9200.00 6313.07 6260.07 59 11 N 73 20 E 5848.64 9300.00 6364.23 6311.23 59 13 N 73 7 E 5934.56 9400.00 6415.19 6362.19 59 33 N 72 48 E 6020.59 9500.00 6465.44 6412.44 60 7 N 72 37 E 6107.04 9600.00 6514.97 6461.97 60 32 N 72 32 E 6193.89 9700.00 6564.06 6511.06 60 42 N 72 44 E 6281.00 9800.00 6613.11 6560.11 60 0 N 73 2 E 6368.13 9900.00 6664.81 6611.81 58 22 N 73 24 E 6453.72 0.83 1647.38 N 5433.42 E 5677 67 N 73 8 E 0.37 1671.72 N 5515.39 E 5763 15 N 73 8 E 0.53 1696.16 N 5597.59 E 5848 93 N 73 9 E 0.48 1720.94 N 5679.87 E 5934 86 N 73 9 E 0.43 1746.17 N 5762.13 E 6020 90 N 73 8 E 0.45 1771.85 N 5844.68 E 6107 35 N 73 8 E 0.45 1797.82 N 5927.58 E 6194 22 N 73 8 E 0.46 1823.82 N 6010.73 E 6281.34 N 73 7 E 2.17 1849.52 N 6094.00 E 6368.48 N 73 7 E 1.10 1874.24 N 6175.95 E 6454.08 N 73 7 E 10000.00 6717.56 6664.56 57 22 N 73 13 E 6538.68 10100.00 6772.48 6719.48 56 21 N 73 4 E 6622.24 10200.00 6828.11 6775.11 55 50 N 73 1 E 6705.33 10300.00 6884.38 6831.38 55 53 N 73 4 E 6787.99 10400.00 6940.36 6887.36 55 55 N 72 53 E 6870.84 10500.00 6996.26 6943.26 56 12 N 72 45 E 6953.75 10600.00 7051.75 6998.75 56 25 N 72 35 E 7036.92 10700.00 7106.94 7053.94 56 30 N 72 19 E 7120.29 10800.00 7162.08 7109.08 56 38 N 71 58 E 7203.69 10900.00 7217.13 7164.13 56 32 N 71 50 E 7287.13 1.54 1898.57 N 6257 34 E 6539.03 N 73 7 E 0.52 1922.81 N 6337 1.O0 1947.11 N 6416 0.12 1971.17 N 6495 0.35 1995.45 N 6575 0.51 2019.95 N 6654 0.17 2044.78 N 6733 0.36 2069.91 N 6813 0.62 2095.45 N 6892 1.50 2121.52 N 6971 32 E 6622 60 N 73 7 E 78 E 6705 69 N 73 7 E 87 E 6788 36 N 73 7 E 09 E 6871 22 N 73 7 E 31 E 6954 13 N 73 7 E 70 E 7037 32 N 73 7 E 22 E 7120 71 N 73 6 E 64 E 7204 12 N 73 5 E 94 E 7287.58 N 73 5 E 11000.00 7271.72 7218.72 57 6 N 72 29 E 7370.89 11100.00 7325.92 7272.92 57 15 N 72 8 E 7454.90 11200.00 7380.21 7327.21 57 5 N 73 23 E 7538.87 11300.00 7434.55 7381.55 57 3 N 73 21 E 7622.81 11400.00 7489.18 7436.18 56 41 N 73 4 E 7706.57 11500.00 7544.07 7491.07 56 32 N 74 5 E 7790.15 11600.00 7599.50 7546.50 56 13 N 74 24 E 7873.38 11700.00 7655.45 7602.45 55 43 N 75 13 E 7956.25 11800.00 7711.76 7658.76 55 43 N 75 29 E 8038.85 11900.00 7767.81 7714.81 55 57 N 75 54 E 8121.62 0.53 2146.92 N 7051.79 E 7371.36 N 73 4 E 0.48 2172.55 N 7131.82 E 7455.40 N 73 3 E 0.55 2197.34 N 7212.06 E 7539.37 N 73 3 E 0 54 2221.39 N 7292.49 E 7623.32 N 73 4 E 0 62 2245.56 N 7372.68 E 7707.07 N 73 4 E 1 77 2269.45 N 7452.78 E 7790.66 N 73 4 E 0 52 2291.83 N 7532.95 E 7873.87 N 73 5 E 0 51 2313.64 N 7612.91 E 7956.72 N 73 6 E 0 34 2334.54 N 7692.86 E 8039.29 N 73 7 E 1 22 2355.16 N 7773.07 E 8122.03 N 73 9 E COMPUTATION DATE: 09-JAN-92 PAGE 4 ARCO ALASKA, INC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 17-0CT-1991 KELLY BUSHING ELEVATION: 53.00 FT ENG[NEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH 'TRUE SUB-SEA COURSE VERTICAL DOGLEG 'RECTANGULAR COORDINATES HORIZ. DEPARTURE NEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG 12000 O0 7823.71 7770.71 56 5 N 76 12 E 8204.46 12100 12200 12300 12400 12500 12600 12700 12800 12900 O0 7879.12 7826.12 56 24 N 76 4 E 8287.63 O0 7934.30 7881.30 56 41 N 76 3 E 8370.96 O0 7989.13 7936.13 56 52 N 75 40 E 8454 53 O0 8043.83 7990.83 56 55 N 75 12 E 8538 21 O0 8098.62 8045.62 56 31 N 7~ 29 E 8621 8a O0 8154.04 8101.0~ 56 12 N 73 5~ E 8705 08 O0 8209.64 8156.6~ 55 56 h 73 52 E 8788 2C O0 8266.27 8213.27 55 ~ N 73 45 E 8870 61 O0 8323.27 8270.27 55 47 N 73 8 E 8952.78 0.82 2374.94 N 7853.59 E 8204 83 N 73 10 E 0.04 2394.93 N 7934.39 E 8287 0.69 2414.98 N 8015 35 E 8371 0.34 2435.46 N 8096 43 E 8454 0 51 2456.49 N 8177 46 E 8538 0 55 2478.35 N 8258 21 E 8622 O 7~ 250~.04 N 8338 29 E 8705 1 45 2524.28 N 8418 09 E 8786 1 08 2547.00 N 8497.32 E 8870 1 34 2570.47 N 8576.06 E 8953 96 N 73 12 E 26 N 73 14 E 8O N 73 16 E 46 N 73 17 E 08 N 73 18 E 30 N 73 18 E 83 ~ 73 !9 E O0 N 73 19 E 13000.00 8379.05 8326.05 56 9 N 72 22 E 9035.76 13100.00 8434.81 8381.81 56 12 N 71 50 E 9118.73 13200,00 8490.16 8437.16 56 32 N 71 27 E 9201.96 13300.00 8545.18 8492.18 56 45 N 70 38 E 9285.38 13400.00 8599.63 8546.63 57 15 N 69 51 E 9369.10 13500.00 8653.57 8600.57 57 29 N 69 21 E 9453.09 13600.00 8707.15 8654.15 57 35 N 69 7 E 9537.25 13700.00 8760.76 8707.76 57 35 N 69 7 E 9621.67 13800.00 8814.38 8761.38 57 35 N 69 7 E 9705.81 13840.00 8835.82 8782.82 57 35 N 69 7 E 9739.46 0.85 2595.06 N 8655.33 E 9035 99 N 73 19 E 0.41 2620,59 N 8734.31 E 9118 0.36 2646.92 N 8813.33 E 920'2 0.36 2673.96 N 8892.33 E 9285 0.67 2702.23 N 8971.29 E 9369 0.40 2731.58 N 9050.22 E 9453 1.47 2761.63 N 9129.13 E 9537 0.00 2792.13 N 9208.16 E 9622 0.00 2822.22 N 9287,02 E 9706 0.00 2834.26 N 9318.57 E 9740 97 N 73 18 E 22 N 73 17 E 67 N 73 16 E 43 N 73 14 E 46 N 73 12 E 69 N 73 10 E 17 N 73 8 E 37 N 73 6 E 06 N 73 5 E COMPUTATION DATE: 09-JAN-92 PAGE 5 ARCO ALASKA, [NC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 17-00T-1991 KELLY BUSHING ELEVATION: 53.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTZCAL DEVIATION AZIMUTH SECTION SEVERITY' NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 0 O0 -53.00 0 0 N 0 0 E 0.00 1000.00 998 56 945.56 6 12 N 83 42 E 38.26 2000.00 1971 66 1918.66 23 25 N 69 1 E 258.15 3000.00 2852 26 2799.26 33 54 N 72 22 E 729.51 4000.00 3523 80 3470 80 55 57 N 75 25 E 1463.89 5000.00 4076 53 4023 53 57 5 N 70 43 E 2296.66 6000.00 4597.82 4544 B2 58 42 N 72 15 E 3148.37 7000.00 5136.69 5083 69 56 35 N 75 26 E 3990.03 8000.00 5668.57 5615 57 57 22 N 73 57 E 4836.7~ 9000.00 6209.79 6156 79 58 8 N 73 18 E 5677.36 0.00 0.89 '15.12 N 35.44 E 38 7.65 65.56 N 249.78 E 258 5.56 227.76 N 693.47 E 729 0.51 429.49 N 1399.61 E 1464 1.91 685.28 N 2192.46 E 2297 0.33 972.98 N 2995.73 E 3~49 0.53 1187.46 N 3809.91 E 3990 1.06 1423.25 N 4623.09 E 483? 0.63 1647.38 N 5433.42 E 5677 0.00 N 0.00 E 0 O0 N 0 0 E 53 N 66 54 E 25 N 75 18 E 91 N 71 49 E 03 N 72 56 E 06 N 72 39 E 77 N 72 0 E 67 N 72 4! E 21 N 72 53 E 67 N 73 8 E 10000.00 6717.56 6664.56 57 22 N 73 13 E 6538.68 11000,00 7271.72 7218.72 57 6 N 72 29 E 7370.89 12000.00 7823.71 7770.71 56 5 N 76 12 E 8204.46 13000,00 8379.05 8326.05 56 9 N 72 22 E 9035.76 13840.00 8835.82 8782.82 57 35 N 69 7 E 9739.46 1.54 1898.57 N 6257.34 E 6539.03 N 73 7 E 0.53 2146.92 N 7051.79 E 7371.36 N 73 4 E 0.82 2374.94 N 7853.59 E 8204.83 N 73 10 E 0.85 2595.06 N 8655.33 E 9035.99 N 73 19 E 0.00 2834.26 N 9318.57 E 9740.06 N 73 5 E ARCO ALASKA, INC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH 'DEG MIN DEG 0.00 0.00 -53.00 0 0 N 0 0 E 0.00 53.00 53.00 0.00 0 19 N 12 39 E 0.00 153.00 153.00 100.00 0 33 N 25 11 E 0.35 253.01 253.00 200.00 0 35 N 24 17 E 1 13 353.02 353.00 300.00 0 49 N 12 59 E 1 73 453.03 453.00 400.00 1 6 N 31 3 E 2 80 553.06 553.00 500.00 1 47 N 49 57 E 4 66 653.16 653.00 600.00 3 2i ~ 66 57 E 90~ 753.39 753.00 700.00 4 19 N 70 20 E 15 7~ 853.73 853.00 800.00 5 3 N 75 56 E 24 04 954.19 953.00 900.00 5 53 N 82 52 E 33.50 1054.81 1053.00 1000.00 7 8 N 83 24 E 44.49 1155.75 1153.00 1100.00 8 34 N 81 49 E 58.09 1257.01 1253.00 1200.00 9 25 N 80 18 E 73.83 1358.66 1353.00 1300.00 11 13 N 80 15 E 91.96 1461.04 1453.00 1400.00 13 15 N 78 22 E 113.74 1563.85 1553.00 1500.00 13 25 N 76 40 E 137.56 1666,72 1653.00 1600.00 13 59 N 75 50 E 161,70 ~'70.07 N 75 49 E 187.78 1753.00 1700.00 15 11 j~74.04 1853.00 1800.00 16 44 N 73 49 E 216.20 j~979 77 1953.00 1900.00 21 53 N 69 21 E 250.36 090 36 2053.00 2000.00 27 0 N 69 13 E 297.30 202 80 2153.00 2100.00 27 20 N 69 58 E 348.59 ~=""~2315 29 2253.00 2200.00 27 4 N 68 17 E 399.93  427 53 2353.00 2300.00 27 5 N 68 55 E 450.69 539 96 2453.00 2400.00 27' 18 N 70 2 E 501.95 2652 58 2553.00 2500.00 27 30 N 70 54 E 553.66  2766 03 2653.00 2600.00 29 11 N 69 13 E 607.12 2882 26 2753.00 2700.00 31 52 N 71 22 E 666.22 3000.89 2853.00 2800.00 33 57 N 72 23 E 730,01 3127.57 2953.00 2900.00 41 34 N 74 10 E 807.60 3264.76 3053.00 3000.00 43 32 N 74 22 E 901.50 3404,10 3153.00 3100,00 45 9 N 73 50 E 998.53 3552.69 3253.00 3200.00 49 16 N 74 41E 1108.37 3708.61 3353.00 3300,00 51 27 N 73 6 E 1227.98 3874.50 3453.00 3400.00 54 50 N 74 30 E 1360.31 4052.10 3553,00 3500.00 55 51 N 75 2 E 1507.03 4232.02 3653.00 3600.00 56 35 N 72 58 E 1656,58 4413.83 3753.00 3700.00 56 24 N 71 30 E 1808.39 4591.77 3853.00 3800.00 55 7 N 71 23 E 1955.44 COMPUTATION DATE: 09-JAN-92 PAGE 6 DATE OF SURVEY: 17-00T-1991 KELLY BUSHING ELEVATION: 53.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORZZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 ' FEET FEET FEET DEG MIN 0.00 0.00 0.46 0.44 0.25 0.20 ~. 64 1 .40 1 .03 0.58 0.81 1 .99 1 .59 1 .15 1.68 0.97 0.50 1 .52 1 .06 2.48 7.68 0 59 0 40 0 52 0 49 0 49 0 35 1 46 0.63 5.72 6.50 1 .05 3.85 1 ,55 1 .85 3.85 1 .81 0.57 1 .25 0.43 0.00 N 0.00 N 0.52 N 1 53 N 2 61 N 4 15 N 5 91 N 8 04 N 10 45 N 1285 N 14.56 N 15.83 N 17.54 N 20.04 N 23.12 N 0.00 E 0 O0 E 0 22 E 0 73 E 1 04 E 1 71 E 3 13 E 7 07 E 13 3,,4 E 2i 29 E 0 O0 N 0 0 E 0 0 1 2 4 6 10 16 O0 N 0 0 E 56 N 22 37 E 70 N 25 38 E 81 N 2~ 37 E 49 N 22 24 E N 27 56 E 95 N 5" 56 E 87 h~ 58 54 E 30.65 E 33.93 N 64 36 E 41.73 E 44.63 N 69 13 E 55.39 E 58.10 N 72 26 E 71.06 E 73.84 N 74 15 E 89.05 E 92.00 N 75 27 E 27.22 N 110.54 E 113.85 N 76 10 E 32.33 N 133.86 E 137.71 N 76 25 E 38.10 N 157.33 E 161.88 N 76 23 E 44.51 N 182.62 E 187.97 N 76 18 E 51.82 N 210.10 E 216.40 N 76 9 E 62.78 N 242.48 E 250.48 N 75 29 E 79.64 N 286.47 E 297.33 N 74 28 E 97.50 N 334.68 E 348.59 N 73 46 E 115.96 N 382.77 E 399.95 N 73 9 E 134.58 N 430.22 E 450.77 N 72 38 E 152.61 N 478.35 E 502.10 N 72 18 E 169.84 N 527.19 E 553.87 N 72 9 E 188,03 N 577.57 E 607.40 N 71 58 E 208.07 N 633.29 E 666.59 N 71 49 E 227.91 N 693.94 E 730.41 N 71 49 E 249.84 N 768.37 E 807.97 N 71 59 E 275.08 N 858.82 E 901.80 N 72 14 E 302.33 N 951.94 E 998.80 N 72 23 E 331.58 N 1057.83 E 1108.58 N 72 36 E 364.98 N 1172.68 E 1228 17 N 72 43 E 403.04 N 1299.43 E 1360 50 N 72 46 E 440.44 N 1441.35 E 1507 14 N 73 0 E 483.24 N 1584.65 E 1656 70 N 73 2 E 528.27 N 1729.65 E 1808 52 N 73 1 E 575.22 N 1869.13 E 1955 64 N 72 54 E COMPUTATION DATE: 09-JAN-92 PAGE 7 ARCO ALASKA, INC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 17-0CT-1991 KELLY BUSHING ELEVATION: 53.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTZCAL ~EVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/100 FEET FEET FEET DEG MIN 4772.01 3953 O0 3900.00 57 42 4956.77 4053 5144.78 4153 5338.08 4253 5532.39 4353 5723.26 4453 5913.87 4553 6105.02 4653 6290,06 4753 6474.t5 4853 O0 4000.00 57 5 O0 4100.00 58 40 O0 4200.00 58 57 O0 4300.00 59 8 O0 4400.00 58 0 O0 4500.00 58 30 OD 4600.00 57 48 O0 4700.00 56 43 O0 4800.00 58 4 N 71 21 E 2105.23 0.49 N 70 59 E 2260.43 0.29 673 N 69 55 E 2419.35 0.10 727 N 69 44 E 2584.40 0.38 783 N 69 30 E 2750.55 0.18 842 N 70 16 E 2912.72 1.09 898 N 72 8 E 3074.84 0.63 950 h 72 52 E 3237.70 1.26 999 N 73 42 E 3393.39 0.00 1044 ~ 76 23 E 3547.90 1.10 1085 623 30 N 2011 14 E 2105.51 N 72 47 E 38 N 2158 O0 N 2308 98 N 2463 26 N 2619 59 N 2771 49 N 2925 83 N 3080 47 N 3230 76 N 3379 20 E 2260.81 N 72 40 E 10 E 2419.88 N 72 31 E 39 E 2585.14 N 72 21 E 46 E 2751.55 N 72 11 E 96 E 2913.97 N 72 2 E 70 E 3076.22 N 72 0 E 95 E 3239.~2 N 72 ~ E 10 E 3394,77 N 72 5 E 01 E 3549.17 N 72 ~ E 6661.32 4953.00 4900.00 57 23 6847.06 5053.00 5000.00 57 19 7029.61 5153.00 5100.00 56 35 7215.40 5253.00 5200.00 57 49 7405.09 5353.00 5300.00 58 23 7596.43 5453.00 5400.00 57 56 7784.52 5553.00 5500.00 57 50 7971.03 5653.00 5600.00 57 37 8156.60 5753.00 5700.00 57 15 8340.28 5853.00 5800.00 56 50 N 76 54 E 3705.91 0.85 N 77 14 E 3862.16 1.17 N 75 26 E 4014.73 0.70 N 75 7 E 4171.25 1.24 N 73 41 E 4332.44 0.58 N 72 28 E 4495.56 1.30 N 73 17 E 4654,84 0.77 N 73 47 E 4812.28 0,82 N 74 26 E 4968.59 0.80 N 75 1 E 5122.63 0.65 1122.21 N 3532.97 E 3706.92 N 72 23 E 1157.28 N 3685.51 E 3862.94 N 72 34 E 1193.67 N 3833.82 E 4015.35 N 72 42 E 1233.78 N 3985.17 E 4171.79 N 72 48 E 1278.40 N 4140.06 E 4332.94 N 72 50 E 1324.83 N 4296.44 E 4496.06 N 72 52 E 1371.84 N 4448.64 E 4655.36 N 72 52 E 1416.46 N 4599.63 E 4812.79 N 72 53 E 1459.12 N 4750,01 E 4969.06 N 72 55 E 1499.46 N 4898,70 E 5123.05 N 72 59 E 8522.93 5953.00 5900.00 57 7 8706.20 6053.00 6000.00 57 0 8893.27 6153.00 6100.00 57 49 9083.20 6253.00 6200.00 59 3 9278.06 6353.00 6300.00 59 13 9475.08 6453.00 6400.00 60 0 9677.40 6553.00 6500.00 60 42 9877.51 6653.00 6600.00 58 18 10064.80 6753.00 6700.00 56 29 10244.20 6853.00 6800.00 55 41 N 75 35 E 5275 43 N 74 51 E 5428 91 N 73 14 E 5587 01 N 73 34 E 5748 48 N 73 12 E 5915 72 N 72 41 E 6085 44 N 72 43 E 6261 29 N 73 22 E 6434 59 N 73 6 E 6592.92 N 73 6 E 6741.85 0.53 2.64 0.72 0.42 0.40 0.61 0.40 0.73 0.47 0.31 1538.52 N 5046.48 E 5275.79 N 73 3 E 1576.63 N 5195.24 E 5429.21 N 73 7 E 1621.26 N 5346.91 E 5587.30 N 73 8 E 1667.64 N 5501.58 E 5748.77 N 73 8 E 1715.48 N 5661.83 E 5916.01 N 73 9 E 1765.41 N 5824.07 E 6085.76 N 73 8 E 1817.96 N 5991.91 E 6261.63 N 73 7 E 1868.76 N 6157.61 E 6434.94 N 73 7 E 1914.28 N 6309.26 E 6593.27 N 73 7 E 1957.75 N 6451.72 E 6742.21 N 73 7 E 10422.55 6953.00 6900.00 55 55 N 72 51 E 6889.52 10602.26 7053.00 7000.00 56 26 N 72 34 E 7038.80 10783.50 7153.00 7100.00 56 34 N 72 3 E 7189.92 10965.55 7253.00 7200.00 57 4 N 72 34 E '7341.98 11149.95 7353.00 7300.00 57 5 N 72 54 E 7496.86 11333.90 7453.00 7400.00 56 59 N 73 17 E 7651.25 11516.16 7553.00 7500.00 56 24 N 74 17 E 7803.62 11695.65 7653.00 7600.00 55 43 N 75 11 E 7952.66 11873.56 7753.00 7700.00 55 56 N 75 36 E 8099.73 12052.74 7853.00 7800.00 56 26 N 76 5 E 8248.28 0.33 0.19 0.42 0.29 1 .95 0.35 1.18 0.58 0.97' 0.61 2000.95 N 6592.94 E 6889.90 N 73 7 E 2045.35 N 6735.50 E 7039.20 N 73 6 E 2091.19 N 6879.54 E 7190.35 N 73 6 E 2138.24 N 7024.21 E 7342.45 N 73 4 E 2185.21 N 7171.84 E 7497.37 N 73 3 E 2229.55 N 7319.73 E 7651.75 N 73 4 E 2273.12 N 7465.75 E 7804.13 N 73 4 E 2312.73 N 7609.44 E 7953.13 N 73 6 E 2349.77 N 7751.84 E 8100.15 N 73 B E 2385.45 N 7896.18 E 8248.63 N 73 11 E COMPUTATION DATE: 09-JAN-92 PAGE 8 ARCO ALASKA, INC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 17-0CT-1991 KELLY BUSHING ELEVATION: 53.00 FT ENGINEER: M.MCBRIDE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HOR[Z. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG 12234.06 7953.00 7900.00 56 43 N 75 52 E 8399.40 12416.80 8053 O0 8000.00 56 56 N 75 6 E 8552.28 12598.13 8153 O0 8100.00 56 12 N 73 51 E 8703.52 12776.76 8253 O0 8200.00 55 17 N 73 59 E 8851.54 12953.19 8353 O0 8300.00 56 10 N 72 45 E 8996.88 13132.75 8453 00 8400.00 56 20 N 71 38 E 9145.95 13314.28 8553 O0 8500.00 56 49 N 70 34 E 9297.30 13498.93 8653 O0 8600.00 57 29 N 69 22 E 9452.19 13685.52 8753 O0 8700.00 57 35 N 69 7 E 9609.48 13840.00 8835.82 8782.82 57 35 N 69 7 E 9739.46 0 45 2421.89 N 8042.97 E 8399 69 N 73 15 E 50 2460.10 N 8191.07 E 8552 53 N 73 17 E 74 2500.61 N 8336.80 E 8703 75 N 73 18 E 50 2541.70 N 8478.99 E 8851 76 N 73 19 E 78 2583 40 N 8618.23 E 8997 10 N 73 19 E 80 2629 14 N 8760.17 E 9146 20 N 73 18 E 64 2677 93 N 8903.60 E 9297 60 N 73 16 E 41 2731 26 N 9049.38 E 9452.57 N 73 12 E O0 2787 77 N 9196.74 E 9609.9~ N 73 8 E O0 2834 26 N 9318,57 E 9740.06 N 73 5 E ARCO ALASKA, INC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA MARKER COMPUTATION DATE: 09-JAN-92 INTERPOLATED VALUES FOR CHOSEN HORIZONS DATE OF SURVEY: KELLY BUSHING ELEVATION: ENGINEER: PAGE 9 17-0CT-1991 53.00 FT M.MCBRIDE SURFACE LOCATION = 1263' FSL & 181' FWL, SEC26 T11N R15E MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST GCT LAST READING 13602.20 8708.33 8655.33 2762.70 N 9131.02 E TD 13840.00 8835.82 8782.82 2834.26 N 9318.57 E ARCO ALASKA, INC. D.S. 4-34 PRUDHOE BAY NORTH SLOPE, ALASKA MARKER TD COMPUTATION DATE= 09-JAN-92 STRATIGRAPHIC SUMMARY MEASURED DEPTH BELOW KB 13840.00 PAGE 10 DATE OF SURVEY: 17-0CT-1991 KELLY BUSHING ELEVATION: 53.00 FT ENGINEER: M.MCBRIDE SURFACE LOCATION = 1263' FSL & 181' FWL, SEC26 TllN R15E TVD RECTANGULAR COORDINATES FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 8835.82 8782.82 2834,26 N 9318,57 E FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMUTh; FEET DEG MIN 13840.00 8835.82 8782.82 9740.06 N 73 5 E DIRECTIONAL SURVEY COMPANY ARCO ALASKA, INC. FIELD PRUDHOE BAY COUNTRY USA RUN ONE DATE'LCX~ED 17 - OCT - 91 DEPTH UNIT FEET .EFE.ENCE 75106 R£C£1VE'D JUN 1 g !992 Oil & Sas Cons. ~nCt]orag° ComrnJssiom~ M il~lpretaDon8 are opinions bleed on iMerenoel from ei~ m ~r me~e~ ~ ~ M~ ~ ~ ~ WELL' D.S. 4-34 (1263'FSL,181' FWL,SEC 26,T11N,R15E) HORIZONTAL PROJECTION mom~ 1O00O ~ 7'~oe ~O.~.E ,,, t I 2000 .... ?'r-'mt ...... mr"?'~ ...... '--r"r"?-~ ...... ?'?'m~ ...... i:"!"i'-i ...... !-i---!--i ...... !-'i"i-'!"- "T-["'['"! ..... ~.-4--4---~ ...... .................... L..L.2...~ ....... L..L..L..[ ...... :...;...;...: ...... L.2...L..~ ...... :...:...:...:.. "~*"!"'?~ ..... ?"?'*F"~ ..... ??"?~ ....... ~"'~**'~-'~ ...... ?T'T": ..... ~"T*'?'~ ..... ??'?'i "!--i"'f"! ..... i'*i"i"i ..... ~'"i"i"i ..... i*"!'-i"'i ...... !"i"i'"i ...... ~"i'"!-'~ ..... !"'!-i"i ..... i'"i ...... i ...... i--i"i'-i ...... !"'i'*'!-'! ...... ~'"! ...... i ..... ~"i'"!'"~ ...... !'"!'-~-i ......... ~"'i"'! ...... i'd"i'"~"'i'"! ...... !'"!'" "i"i-i'"i ...... ??'i"'i ...... i"i"i"i ...... i'"!-'i"'! ...... i?i"i ...... i"i'-i"i ..... ?'?'i'",'"i"i'"!'"! ..... i-i-'!'~! ..... :'!:: !:!: :~:~ :!:: :!:: :!:!:::: :::: !!i: :~:: -+-}.-+--3 ...... 3--.!---}---3 ....... 3-.+-~---3 ...... 3-.+--~--~ ...... 3-+--3---3 ...... 3--+-3.--3 ..... 3-.-~-.+--~ ...... !-.+--~---~ ....... ;.-+-+-3 ...... i-+-+.-~ ...... 3-.+-~.-.~ ..... 3.-+-~---! ....... 3.-.~-.+--~ ...... ~-..;..+.-; ..... i..+-+.-; ...... ;--+-.i-.+-- _~...t...~._~ ...... ~...i...~...;...:...i...~...~_.; ...... ;...;...~...~ ...... ;...~...!...! ...... !...~...~...~ ..... i---i--i---i ...... i--4--.i---i...~--.i.--~.--i---i ...... i-4.-.~---i ...... ~-.-~-.-i..-~ ...... ~-.-i...i..-~ ...... ......................... - ................................... -~.-i...i...~-t...~...i.--i-..i ...... i-.4.-4.-.i ...... [...i...i-.-~ ...... i...i.--!--.[ ..... i..4.-.~...i ..... i..4~.!.--i ...... i.-i...i...i ...... i...i...i...i ...... ~-~...~...; ..... ~...~...~...! ...... ~...~-..~...~ ...... !...~...~...~ ..... !...[...~...~ ...... ~..[...~...~ ..... ~...~...i.4... ..................................... :::: ;::; ::;; :::: :1:; :::; --}.-~-.+--3 ...... ~--+--3---3 ...... 3---3 ...... ~ ...... }.--~ ...... ~ ............... ~..., ...... ~---3 ........ 3-.-~--+--i,--!--.i--i--i ...... i"'i'"~"i ...... i-i"i'"! :::: :::: :::: :::: :::: ::::...L..L..L..! ...... L..i...i..~ ...... ~.]...!...~ ...... L..!...3...! ...... i...i...i...! ...... L.~...i...L..!...L..L..i...! ...... !...i...i...i ...... i...k..L..i... "'!"?'?"~ ...... q'"Y'T"? ...... ~'"?"?"? ...... ~'"!"'!"'~ ...... ?"?'"~'"! ..... i'"?'"?'~ ..... F"!"'!"'?" ........................................................................................................ [ ............................. I ............................................ !'"!"T"?,"T"!"'?'~ ...... ~'"!"T"! ..... ??"~'"? '++'~"~ ..... ~'"~"'~'"~ ...... ~'"~'"~'"~'"::i:::i::?:::i:::i:::i:::i::::::!%::i:::!:::::i:::i::i:::i:::~'''~'''~''+''~ .... !'"h'"i ..... i"'i'"!'"i'"h'"f!'"' ...... i"'i'-i"'i ...... i"+"/ ~'"'"'i'"i ...... i'?''''''~ ...... !'"""i'"i'" ............ ...L..L..!...! ...... . ......... i .......................................................................................... .--~o-}--+-.3 ............ ...... b-4...b--} ...... 3---3---3.-.3--- ~ : : : : ................ ?i'"!'"i ...... !'"7i'"! ...... !"i"i"! ..... ?"?i ...... ?--i--i--i ..... i"'!'"i"!'"[---?i'-?i ....... !---?'i-"i ...... ?!'"!'-i ....... ?-i"'?"i ..... ~'-i-'i'--i ...... i'"i"i"'i ...... !"!"'i'"i'"."i'"i"'i'"i ...... i'-i"'i'"i ....... ?'i'"!"' ~...~-.~.-.~ ~.-.!---i---i-- ,4...i...i..iiZZiii]i]iiZiZ iiiiZ!i]!Zi]i~iEiEii...L.i ,..~...i...~...~ ...... 3..+.+.-~ ...... ~...i...~...~ ..... i..4-.i.4 ...... ~--~.4-.i ...... ~...~...i...~-. ~...:...~...:... .............. ' ~ : * · · · ~ ~-.4--~---~ .--!--i-..i---i ..... i--+-+--i ...... i.--i-+--i ...... !---i---i-.-i--.,---i-..!--i.--i ..... i--~---k-i--~---i--.i-.+--i ....... ~.4...~...~ ...... ~.4...~.-i ..... -+-}--+--} ..... F-}---}--.} ...... }.--kq---?--} ...... }---} ...... i---k-}--.! ...... i.-+-.F--}--'..+-.k-}---} ..... +--}.-.i--.} ..... +..}--+-} .... F+--}---} ...... }.-.} ...... } ...... }...}-+-.} ......... F.i...{ ...... i.-.}-.-}..-i ....... }...}-..}.--} ...... }.--}.-.F-.i-.' '--}--}-'-}---} .... 4---}-'-}---3 ...... 3'--}---3---} ....... 3---3---i-.-3 ...... 3-..3---3-..i ....... b--3--.3---3--;-..}--.}-.-3.--3 ...... 3.--}---3---} ..... 4...3---3--3 ...... ..!.-L..L..~ ...... i...i...t...i :::: }..4..-{--.~ i...i...}.--i.-.L..}...}-..}.-.} ~...i...i...{ i.-.}.--}--.i 4.:.}---i--i.--}---}--.}.-.} ;;]; ;;il :::: :::: ::;: .... ........ "':'":'":'": ..... ...... ...... ...... ..... ....... !"T'T"i ...... i"T~i'"i"'Y'T'T"! ...... {'"?'T"; ...... ..t..i...L..! ...... i...i...L..i ...... i...L..!...i..'...i...L..i...i ..... i..i...L..! ....... i...L..i_ i ..... !.i..i..5..i...i..i ...... L..L..L..i ...... :...:...:...: ...... :...:.~:...: ...... ;...:...:...: ..... :..:...:...: ....... :...:...:...; .... : .... ~...:... l=:: ::~: ::: :::; ;::::;;:: :: :::: ::::r:::: ...!..i_.i...~ ...... ~...i...!...i... ~..i...!.i. ~..~..~. :.ii~ ~ ......... i!...!._i ...... i_i...~...~ ....... i~..i...~ ...... i...L..i...i ..... i...i.i...i..~l~,40~ .i...L.i...L., i ,-'i-'i"'i-"! ...... !--i-'i--i-"i'--i-'-i'-i"-i--' :~:: :{:: :::: :::: :~!! :!!: :::: ::!: :::: ::!! ' ~n,m~::: :::: ::i'~ :::} :::: · -.!'?r:--i.-i-i---~ ...... i--i---?i--.,.-.!-.-!--.i---! ...... i--i.--r~ ...... i--i.-.?i .... i--.?i--i---i---?.?i ...... i.--?i--~ ....... i-~~--.?-.i--i.-i--.~ ..... !---!--i..-i ...... i-..?-?.i ...... ?i-..~ ..... i...ri.-.!--. · .-i'-}-"3-'-} ...... 3'"} ...... i ...... i---}-"3-'.} ....... }--4 ...... i-3---}---}---b ..... }-.4---i--.3 ..... :--.}--}.-.3---i ...... }.-.:.- ..,~r~-~.} ....... }---}---i---3 ...... i-.-3--'3'"} ..... }-.-3.-3--.3 ...... 3..-b-4..-3 ...... }-"i ...... i ...... }--3 ...... } ...... 3-'-3-'-}---}--- ~ ::: :;;: :::: :::: :;:: :::: }:::.i,,~''~&''~ :::; :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~"~"'~"?'"'mm:'~'"m?'"'?'m,'"?.~...~...~ ...... ~...~.-i...~...:...~...~...i...i ...... i...~...~...~ ...... ~...~...~...~...:...~...~...~...i...~ -i.+-!-.-i ...... i--i-+-}--.~---i-.i--.}-.-} ...... i---i---}-.~}---~~-.-i---i---}---i ...... i---i---?--i--.!---!---i.--/ ...... ?+.'~--.~ ...... ~---}--'~-"~ ..... ~'--~-+-~-"'"+-.~...~"-~ ...... ~--.~-.-~'--~ ...... ~'"~"'h"'d"'~"'~"i'" · .4.-i-g--i ...... i---i.--!---i ....... i..4..4...i ...... i...~...i...i ...... t...i...i...i ...... ~-.~--.i-4--'-.-i-.-t-..i-.4 ...... i--4--4-4 ....... ~...i--4-~ ...... ~--4..4.--~---~.-4.-4--4..4 ...... i-.-i--~--4 ...... i...i...~...! ...... i...~...i...i ...... !...i...~...i ...... i...i...i..4..~ .,.: .,:: :..: :::: :::: ::., :::. :.., ::.: ............. :,. .::: :::. .:,. "'~'-?'?"~ ................................ ...... ~"+'+"~ ............................ ....... ~"+'+"~ ...... ~"+'+"~ ...... ~"+"~'"~ ...... ~"'~"+"i ..... ~"+'+"~ ...... ~'+'+"~ ....... {'"~'"i"~ ...... ?i"i"i ....... ??'i'"~ ...... i'"~'-i"'~ ...... i'"??"~ ...... i'"?'i ...... ?-?"?"i ...... 71"i"i" ~ ii~ ~i~:':::: :~ ;::: ~:~: ~:~: ::~ :~l~ ::~~1~ .........................:~:~ : :~ :::: :~:: ~ :ii ............................................................ · '?-m:'": ...... :-"r":'": ....... :-":"':'"~ ...... r-'r":-": ...... :'--:'":'": ...... :---~'":"': ..... r":"':"'; ...... :'":"'~'"~ ....... :'":'":'-: ...... :"':"'?': ....... :"':'":'":","'r":'":"': ...... :"':'":'": ...... ?':"':"': ...... :'":"':'": ...... :'-'r-':'":'- · ..:.-:...:-.: ...... :...:..+..: ...... :...:...~...: ..... :...:..+..: ...... :..+.+..: ...... ~..:..+..: ..... :..+..~..~ ..... :...:..+..: ..... ~...~.-+-: ...... ~..+..:..-~ ..... :..+.-:--.: ...... :...i.-:.--: ...... ~..+.+--: ...... :...:...:.--: ...... :.-:...:.--: ...... ~..+..:..+. ...t.4...t...t ...... t...t...t...t ...... :...:...:..4 ...... ~...:...:...~ ...... :...:...:...t ...... L..L.4...: ..... t...t...:...: ...... :...L..i...: ....... L..L..:.4 ...... ~-.-~--4---~ ..... ~..-:..-~---~--~-.-:.-.~.--:-.-~ ....... ~.-4..-}..-~ ......... :-.4...~ ...... :.--:--.:..-i .......... :...~..4-.. · 4.-~...~...~ ...... {...;...;...~.-.:..-J.-.L.L-: ..... L.~...L--; ...... L..L.L..; ...... ;...;...:...;.-J-.; ..... :...J ...... :...~...~...~ ....... ;...~...:.4 ...... ~...~...:...: ..... ~...~...~..-~ ......t :...:.-~...: ...... :..-~...~.-.: ...... ~...~...~...: ...... :...:...:...: ...... ~...~..-~...~.-. _~._~...~...~ ..... ,.++..~ ...... ~...~...~...~ ...... ~..+..~...~ ...... ~...~...~...~ ....... ~.+.~...~ ..... ~.+.~.+..+.~.+.~ ...... ~.+.~._~ ...... ~...~..+..~ ...... ~..+..~...~ ...... ~..+..~...~ ...... ~..+..~...~ ....... ~...~..+..~ ...... ~...~..+..~ ...... ~...~...~..+. ::~::t::~::~::::::::::::::::::::::::::::::::::::.~~ ..... ~...~...~...~ ............................................ ...... ~...~...~...~ ....... ~...~...~...~ ..... ~.+.~...~ ...... ~...~...~...~ ...... ~...~...~..~ ...... ~...~..+..~ ..... ~...~...~...~ ...... ~...~.~...~ ...... ~...~...~...~ ..... ~...~...~...~ ..... ..~...~...~.~...~...~.~..~ [ .-~-..~..-~---~ ...... ~...F-4---~ ..... ~--~---~---[ ..... b-.k-.}---i--.~.-4--.~---~---~ ...... ~---~--4--~ ...... ~--.~.-4...~ ...... b.-~.-4.-.~ ...... ~-..~.-~..4 ...... b--~---b.4 ~--.~-.-~..-~ ...... ?--?..-?.-~ ...... ......................... ~'~'-?'~'"{ ...... Y'T'T"~ ...... ~'"?'~'"~ ..... ?~'"??":'"?'?~'"~ ...... Y"?~'"~"'??T"~ ....... ?'["T"~ ...... ~'"~'"~'-~ ..... '5'-k"~"~ ...... ~'"~"'~'"~ ...... ~'"~"'V"~ ..... ~'"~'"~'"~ ....... ~"'~'"~'"~ ...... ~"'~'"~"'~-."'~"'~"'~'"~ ...... ~"+'+"~ ..... 4--+.+-~ ..... ~-.+-+--~...'.-.~.-+..~--.~ ...... ~---~.+--~ ...... ~-.+..~--.~ ...... ~.-.~.--~--.~ ...... ~.-,...~...~ ..... ~...[--+.+-. ............................ :::: :::: :::: :::: :::::::: :::: :.:: :::: """~'":'"~ ......... :"'~'"' ......... :'":'"' ...... '"""': ...... :'":'""'"'"' ...... '"':'"'"'"'~'"'"'~"'"'" ....... :'"'"':'": ...... '"'"'"'" ..... ~"'g"'~'"g'""'~'"i'"i'"~ ...... ~"Y'T"r ...... ~"'~'"i'"~ ...... g'"~"'~"'~ ...... ~"Y"r"Y'~'"~'"~'"~'"~'", ...i-4.-.i.--~ ...... i..4--.i--.i ...... i..4---i--.i ..... i...i...~...i...~...~.-.i-.-i-..~ ......... i...~...i--~-.~..4...i...i ....... i..4.--i---i ......... ~...i.-i ..... ,-..,..-,.--, ....... ,.--,...,--., ...... ,-..,---,-..: ...... ,...,.-.,..., ...... ,-..,--.,-.., ...... ,..-,..-=..., ..... :.-.,.--,..-:.-. . ..................................................................................................................... --.i.-i---i---i ...... i-.-i---i---i--.,.-4--.b-.b-.i: .... i..-i---i---~ ..... i.--g---i---~ ....... ~..4---i---i ..... ~--.i..-i--.! ...... i---i..-i---i ....... i---i--4--~ ...... ~ i}i~ ..... {{i :~}:j::i'.-+-.k-k.~ ............................. .-.~.-.~-..,-..~ ...... ,--~...i.-.~ ...... ~...~.-.,-..,... .................................................................... ?'?'?'T" "'??'~"'~",'"???~ ...... ??'"~"'~ ...... ~'"~"T"? ...... ?"??[ ..... ?"?'~"T" ..+.~..+..~ .... ~...~_+.+.. iii ! ! ...~..4..:...: ....... ~...1...:,..: ...... :...;.4...: ...... :..:...:..4 ...... ~...;...:..4... ........ '"~'"~"J-'~ ..... ~'"i"'i"'i'"~"'~'"i' '~' i .... i'"i'"}"'i ..... }'"i"'~"i ...... i'"}'"}'"}'"l "4'"i"'}'-} ...... i"'}'-}'"} ...... }'"b"!"4" . .................... :~r~::k::~:::::l::J:::~::J::::::~:J::~::J::: :J::J:::~:::~::: :::::::::::::::::::::::::::::::::::::::::~::J::~J::::::~::~::J::J:::'"~'+'~'-~ -4-4.--~---[ ...... [---~---[-.-~ ...... [-.-~--.~---~ ..... ~-..[...~..4.-.~,..~...~.--L-~ ....... ~.~..-~--.~ ..... ~---~--4.--~ ...... ~---[-4-4 ...... ~-.+.+-~ .... "+'b'~'"~"~-~'"~"+"~ ..... ~'"b'l'"~ ..... ~'"/~'"} ...... b'~'"~'"~ ..... b'~'"~"i'-:"'b'~"'~'"~ ..... ~'"~':~'{ ...... b'~"'~'-~ ...... ~"'~'"~"'~,:,: ...... ~'-~'-~'"~'-:,:: -"~---*'-~'"~"~'~::: '-'~"-~-"~"'~,::: ...... ::,,~'"~"'~-"~ ....... ~:,:*'-~"'~'"~ ...... :::~"'~'"~'"~'" WELL' D.S. 4-34 (1263'FSL,181'FWL,SEC 26,T11N,R15E) VERTICAL PROJECTION -4000 -~)00 0 0 ~)0CX) 4000 ¢~:)00 8000 10000 I i-.-~...~?-.-i-..!---i--!.--~:i]-~c~.i.--!--.i ...... i.--i---i.--i ........ i...i_.L.ia~...inCtO~C...L.i...L.i ...... L-.i...L.i...:...?.i...i~4... ::: :::: :::,~ ...... ~--+-+--~ ...... ~--+--~---~ ....... L..L..L..! ...... L..L..L..~ ..... ~'"['-~'"~ ....... FT'T"~ ..... L..L_L..[ ..... L..L..L..[ ..... L..LJ...[ ...... L..L..L.[ ~::~::~::J: ::~ J:::~::: ..... i-.-~-,~---i ...... i---~---¢'--~ ................................................ ::::::::::---: ........ . ......... :._,..., ....... ::::,-.-,--.: .......... ...... ~...~...~...~ ....... ~...~...~...~ ~---~--.~---~--.~.--~-.-~-..~-.-~ ....... ~---~---~-~-~ ................................................................ ....... ~'"~'-~'"~ ...... FT"Fi ...... ...... F'F'F'~ ...... FT"Fi ..... :::: .... .... :::: ...... ~'"~'-~"'~ ...... ~'"~'"~'"~ ...... ....... ~:-:~::~.:~ ..... k~.--~--.~ ...... ................................................................ ...... L..L.L..i ...... L..L..L..i ...... k.~--~---~ ...... ~.--~.--k-~ ......... ...... ~--i--f-'-~ ...... h'~'"hi ...... ...... ~'"~'-~'"~ ...... F"F'F'~ ...... ~ ...... ~ :::: ...... mr-r--: ...... r'-r'-,---~ ......... ~"'~'"g"'~ ...... ,'"~"','"g ..... f"'f"f'"f ...... f'"f"'f'"~ ..... ...... ??..?..., ..... ?'i'-?h'i'"h'i"'~"i ...... ~'--~--~'--~ ...... ~"i'"P'~ ...... -----..----------..--.-----..---------..--..-.-.---.--.-.....---;"';'"¢'i ..... ...... ..... :::::;:;:::;:;::::;;;:;:;::;:;;;:::::::;;:;....~...L.L..L};;:: ..... ..... m--.?-, ...... ?'4.00 ~,,AI.E~lN~!~q"fl~Ll~!~'H~ ItC)~I~AL~ 1 / ~)000 IN/rr AOGCC GEOLOGICAL MATEniALS iNYENTORY LIST PERMIT# ~" - ~ WELL NAME ~),~' /-~ COMPLET!ON OATE /,~ t~ ? / CO. CONTACT ,,,~C~ ch'e~ ~ff"'or iiS'~'d'~ta as it is received.~'~ rec~'ived date for 407. if not required list as ~R 407 ! */-/a'/7~- J d'rili.in9 history.' !~'"'!. su.rve,vJ / !" well tests cored int~wals . core anal~s.is .. j~ d~ ditch intc~a.ls digital ~at.~ .............. .... ~&~ ~.,, i "Lv;m n.'- TYPE ........... i RUN i~ .......mm~mm~m~cnt~'~mm el Lrtv.~-,.LO " SCALE NO. (tO thc .ncarcst.fo0t) . . [inchl100'1 .... . . I t ,/~ ~"~ - 13&tim .~ ,/ ~ ,, ~ ............. ~i,~//c_ .,~,~:./~. . I ,,~y,,~,,'.~/~- . ., ~ ~o ..?~./.j.,,,~/~~.. .~e / ~r/~,,: /??~ ~ .......... o I . ~/~ ~/~w~l~x~ c,~o ~ /. 7~'~/,.-/3/,~&. ~ .~ .r"' 71 ........... r, , ~I ............. ,,, , ] , , ,, , , ~i .......... ~i .................. ~i ...................... 1 ...... I ' 1 "~i " ....................... i i ii ii iii i i i i iiii iiii ii i ii i i i i ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 9950'1-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 SEPTEMBER 24, 1992 MARION SLOAN BP EXPLORATION ALASKA INC. P O BOX 196612 ANCHORAGE, ALASKA 99518-6612 RE: 92-0053 PRUDHOE BAY UNIT N-24 COMPLETION REPORT' 92-0066 PRUDHOE BAY UNIT DS16-29A COMPLETION REPORT 92-0056 PRUDHOE BAY UNIT DS16-29 P&A PAPER WORK 92-0075 PRUDHOE BAY UNIT DS16-31 COMPLETION REPORT 92-0067 PRUDHOE BAY UNIT DS7-4A COMPLETION REPORT 78-0012 PRUDHOE BAY UNIT DS7-4 P&A PAPER~WORK 92-0060 PRUDHOE BAY UNIT DS15-18 COMPLETION REPORT 91-0054 PRUDHOE BAY UNIT. DS4-34 P&A PAPER WORK DEAR MARION SLOAN, OUR FILES INDICATE THAT ARCO ALASKA AND BP EXPLORATION ALASKA INC. IS THE OPERATOR OF THE REFERENCED WELLS. THESE WELLS HAVE REPORTED PRODUCTION TO US AND WE HAVE NOT RECEIVED THE APPROPRIATE COMPLETION REPORTS (407 FORMS) TO DATE. AUGUST MONTHLY PRODUCTION PREPORTS INDICATE THAT THESE WELLS ARE OIL PRODUCER FOR THE YEAR 1992. WE HAVE NO PAPER WORK SHOWING THE COMPLETIONS FOR THE WELLS OR PLUGGING AND ABANDONMENT OF THE ORIGINAL WELL. I AM FORWARDING THIS LETTER AS A RECORD FOR YOU AND ME, NOT AS A FAILURE TO COMPLY. THANKS FOR YOUR QUICK RESPONSE ON, THESE REPORTS. SINCERELY, STEVE MC MAINS ARCO Alask~ Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 6-5-92 REFERENCE: ARCO MAGNETIC TAPE(S) WITH LISTINGS Job#AK-MM-911022 Run I Jo~18 as receipt of data. · Have A Nice Day! Sonya Wallace APPROVED ATO- 1529 Trans# 9211 Sperry Sperry Sch CENTRAL FILES (CH) CHEVRON D&M # DEDE SCHWARTZ (OH/GCT) # EXXON MARATHON -- MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO RECEIVED JUN O 8 1992 Alaska Oil & Gas Cons. Commission P.O.Box 100360 . Anchorage, Alaska 99510 DATE: 6-5-92 REFERENCE: ARCO OPEN HOLE FINALS 2-34 1114-18192 ~1~ ~ 10/6-10/91 10/6-10/91 11-16ST 5-27-92 1, ~'&~ MWD: DGR/EWR/FXE Run 1, ~'&~TVD $STVD Run 1, l"&2' 11-16ST 5-27-92 CNL/GR Run 1, Please sign and return the attached copy as receipt of data. Sperry Sperry Sperry Atlas Atlas Atlas Atlas RECEIVED BY__~~~-- f ~f Have A Nice Day! _~~ Sonya Wallace R E C E IV E ATO-1529 JUN 0 8 1992 Trans# 9211~-7-' ..... Alaska 0il & Gas Cons. Commission # CENTRAL FILES Anchorage # CHEVRON #D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILIXPS # PB WELL FILES R&D # BPX # STATE OF ALASKA # TEXACO STATE OF ALASKA AL~,.,'~A OIL AND GAS CONSERVATION COMMIS~.,~N APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon~_~_'/'~ Suspend ~'~z~ Operation Shutdown __ Re-enter suspended well __ Alter casirfg Repair well __ Plugging X Time extension __ Stimulate __ Change approved program __ Pull tubing __ Variance __ Perforate __ Other x __ Plug Back & Sidetrack 2. Name of Operator 5. Type of Well: 6. ARCO Alaska, Inc. Development x Exploratory __ 3. Address Stratigraphic__ 7. P. O. Box 196612, Anchorage, Alaska 99519-6612 Ser~ce__ 4. Location of well at surface 8. 1263'FSL, 181'FWL, SEC. 26, T11N, R15E At top of productive interval 9. At effective depth 10. 1321'FNL, 1320'FEL, SEC. 25, T11N, R15E At total depth 11. 1273' FNL, 1159' FEL, SEC. 25, T11N, R15E Datum elevation (DF or KB) KBE = 64' feet Unit or Property name Prudhoe Bay Unit Well number DS 4-34 Permit number 91-54 APl number 50- 029-22160 Field/Pool Prudhoe Bay Field/Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 80' Surface 3937' Intermediate 13587' Production Liner Perforation depth: measured none true vertical Tubing (size, grade, and measured depth) none Packers and SSSV (type and measured depth) none 13840' feet Plugs (measured) TOC @ 13035' (top of plug) 62 cu ft Cmt 8868' feet bkb EZSV @ 13543'- 13735' 48 cu ft Cmt 13035' feet Junk (measured) 8399' feet bkb Size Cemented Measured depth True vertical depth 20 x 30" 8 cu yds 110' 110' 10-3/4" 2522 cuft 39 70' 3515' 7-5/8" 1608 cu ft 13618' 8748' Not run RECEIVED JAN 2 1 t992 ^laska Oil & Gas Cons. Commission Anchorage 13. Attachments Description summary of proposal x Detailed operations program BOP sketch 14. Estimated date for commencing operation 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ '[~. ~ ~0r' ~t~'-//[-~r~(jY~' Title WorkoverSuperintendent FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test ~ Subsequent form required 10- ORIGINAL SIGI'~ED BY Approved by order of the Commission !..O~,,~NIF C SMITH J Approval. ~ NO. Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE BACKGROUND: DS 4-34 Abandonment DS 4-34 was initially spudded on 9/27/91. The well was kicked off at 500' md/tvd with inclination angle being built to 56°-. The 10-3/4" casing was run and cemented without incident at 3513' TVD/3970' MD. The intermediate 9-7/8" hole section was then drilled to casing point at 13618' md. Intermediate 7-5/8" casing was then run and cemented with an MTC cretaceous lead slurry and "G" tail system. The intermediate 7-5/8" was set with emergency slips to reduce potential rathole due to the high inclination of the wellbore and its related sensitivity to shale instability. A 6-3/4" production hole was then ddlled to TD in the well at 13,840'MD/8868' TVD. Open hole Icg evalution of the production hole did not indicate producable oil column. A gyroscopic survey was run to confirm the MWD directional coordinates - the results of which validated the MWD. DS 4-34 was then temporarily abandoned by positioning an EZSV at 13543' MD and squeezing 8.5 bbls below- an additional 11 bbls of cement was placed on top of the EZSV. The cement top was tagged at 13035' md and 10,000 Cf of stringweight was slacked off to confirm cement integrity ( witnessed by AOGCC inspector Doug Amos). The well was then displaced to diesel from 2180' md to surface, an FMC dryhole tree was installed & tested and the 10-3/4" x 7-5/8" annulus was freeze protected with 120 bbls of diesel. Nabors 28-E released the rig 0900 hrs 10/20/91. The re-drill of well DS 4-34 now designated DS 4-34 A required the placement of an additional EZSV postioned at 11340'md (date of installation: 1-18-92). In addition a cement plug will be placed in the well starting 100' md below the proposed milled section ( milled section to extend from 10960' md to 11040'md), estimated at 11,140'md. A 5-1/2" production liner will be tied back to the intermediate 7-5/8" casing with approximately 300' of lap. A "G" class tail cement will be used for the primary cementing of the 5-1/2" 13 Cr liner. The calculated displacement of the "G "tail slurry will bring the cement top to 200' above the 5-1/2" liner top packer in the 3-1/2" x 7-5/8" annulus. This cement will then be drilled up or reversed of the top of the liner top to provide access to the 5-1/2" liner to run the completion. RECEIVED JAN ~ 1 t992 Alaska Oil & Gas Cons. CommissiOn Anchorage 5000 PS1 STACK ANNULAR PREVENTER 7 PIPE RAMS 6 ACCUMULATOR CAPACITY TEST 1. CI-tE. CK AND FILL ACCU~TOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3, OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECOR~ THE TIIVE[ AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUIVP OFF, 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONO~ CLOSING TIM~ AND 1200 PSI REMAINING PRESSURE. BLIND RAMS 5 . . SPOOL 4 3, j, ,, ! PIPE AMS 7. ! , I i- 10. 11. 12. 1:3. 14. 1.13-3/8' CASING HEAD 2. 5000 PSI TUBING HEAD 3.13-5t8' - 5000 PSI PIPE RAMS 4. 5000 PSI DRILLIN(3 .~I3CX3L 5.13-M~' . 5000 PSI BLIND RAM~ 6. 13-5/~' . 5000 PSI PIPE FI~MS 7. 13-5t8' . 5000 PSI ANNULAR BOP STACK TEST FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL IN WINTER OR SEAWATER DURING SUMMER MONTHS. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEFTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. INCREASE PRESSURE TO 2500 PSI AND HOLD FOR 10 MINUTES. BIF_~D TO ZERO PSI. OPEN ANNULAR PREV~ AND CLOSE TOP SET OF PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 10 MINUTES. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED DOWNSTREAM PRES.SURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 5000 PSI UPS'T~EAM OF VALVE AND WrrH ZERO PSI [::X:)WNST~EAM. BLEED SYSTEM TO ZERO PSI. OPEN PIPE ~. BACKiOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAIVEI AND TEST TO 5000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. OPEN BUND RAMS AND RECOVER TEST PLUG, MAKE SURE MANIFOLD LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION, TEST STANDPtI~ VALVES TO 5000 PSI. TE~'i' KELLY COCKS AND INSID~ BOP TO 5000 PS1 WITH KOOMEY PUMP RECORD TEST INFORMATION ON B~.~ PREVENTER TEST FORM. $ AND SEND TO DRILLING SUPERVISOR. ~M COI~3LETE BOP TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY FOR DRILLING OPERATIONS, FOR COMPLETICN, WORKOVER OPERATION~, PERFORM COMPLETE BOP TEST EVERY 21 DAYS AND FUNCTION TEST EDP WEEKLY, I ECEIVED JAN 2 1 1;992 Oil & Gas Cons. Commission Anchoran~. DAM 11/20f89 BOP SCH (FOR: NAB 2ES) AI...ASI( A , INC. BOX i 0~360 /--'-, ANCi-IORAGI::', ALASKA 9. ~ 0 DATE: tt .... t-9t RI.-".:F'EI;:FNCE: ARCO OI:'IEN HOI..IE FINAI...S '"'~' -' t ~-"t 6-9t ~o .... ~ 6-.9~ ~ Hu~..-6R ,/--5 ---34 .~1~( .r~.5.... g 4 t 0-'t 6-'9t D.I:I::L-[;R t 0"" t 6""9 t CNL-GR t 01t 8,20191 5'5'1"VD t0/t8,20/9t BHCA-GI~ 'i0/i8,20/9~ D ]: F'i...-GR t0/t8,20/9t CNi._-C.R RUN t, t "&2" A'f'I...AS RI..JNt, 2" &5" ATI_A.S' RUN t, 2 "&5" ATI...AS RUN t, 2 "&5" ATLAS RUNS t&2, t "&2" A'i'I...AS RUNS t&2, 2 "&5" ATL. AZ RUNS t &2, 2'&5" A'I"I...AS RUNS HAVE: A Nil:; - Alaska Oil & Gas Oons u Anchorage $ONYA WAI,..L. ACE AF'F'R[.IVE:I) ...... ATO-t 529 TF;tANS':.": 9t ~4~? DISTRIBUTION CE N'f'F,,'A L FILES CHEVRON D & M EXTENSION EXRLORATION EXXON MARATHON MOBIL F'HILLIF'S F:' B W E. L. L F' I L.. E: S R & D '"' BPX ,~I'A'i'E OF AI_ASKA T E X A C. 0 ARCO ALA~'KA, INC P~ O. BOX °1 (°)(°).360 ANCHORAI.'~E, At_A.'.'~KA 995~ ¢'", DATE: ~ 0-'.30-9 ~ REF'EF:ENC)E:: ARCO MAGNE'I'IC -I"APE(~') WITH I..].'5'T]:NG(~') 4 S5 9'--2~ -9~ D IFL./BHCA/ZDEN/CNL~~ JOB~89793 F'I..EA;~'E ~IGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA,. RECEIYED BY HAYE A NICE Alaska Oil & , Gas Cons~ Cu[c~lti~siOn_ .... SONYA WALLACE ATO-~ 529 APF'ROVED ~46~ '['RAN£'=..- 9 A T I... A ,F; ATL. A.S' D I ,.S' l' R I B U'f I [.I N CENTRAL F'ILE~' (Cia) CHEVRON D & M 'f'AMMA$ BROWN (OH/GC'I") EXXON MARATHON MOBIL PHIl_LIP.9 PB WELL F':I:L.E,S' R & D ~ BF'X ~'TATE OF RLA,~'KA TEXACO STATE OF ALASKA 0 ~ ALASKA OIL AND ~AS CONSERVATION COMMISsarial APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Alter casing __ Repair well Change approved program 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 ~~ operation Shutdown x Plugging X Pull tubing ~ Variance__ 5. Type of Well: Development x Exploratory Stratigraphic Service 13840'feet 4. Location of well at surface 1263' FSL, 181' FWL, SEC. 26, T11N, R15E At top of productive interval At effective depth 1321' FNL, 1320' FEL, SEC. 25, T11N, R15E At total depth 1273' FNL, 1159' FEL, SEC. 25, T11N, R15E 12. Present well condition summary Total depth: measured true vertical Re-enter suspended well __ Time extension ~ Stimulate __ Perforate __ Other __ 6. Datum elevation (DF or KB) KBE = 64' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number DS 4-34 9. Permit number 91-54 10. APl number 50- 029-2216O 11. Field/Pool Prudhoe Bay Field~Oil Pool Plugs (measured) 13035'-13543', (62 cu ft cmt) 13543'-13735' (48 cu ft cmt) 8793' feet bkb Effective depth: measured true vertical 13035' feet Junk (measured) 8399' feet bkb Casing Length Structural Conductor 80' Surface 3937' Intermediate 13587' Production Liner Perforation depth: measured none true vertical Size Cemented Measured depth 20 x 30" 8 cu yds 110' 10-3/4" 2522 cu ft 3970' 7-5/8" 1608 cu ft 13618' Not run True vertical depth 110' 3515' 8748' RECEIVED Tubing (size, grade, and measured depth) none Packers and SSSV (type and measured depth) none OCT 1 !991 Alaska Oil & Gas Cons. ^nch0ra~e 13. Attachments Description summary of proposal x Detailed operations program BOP sketch 14. Estimated date for commencing operation October 18, 1991 16. If proposal was verbally approved Name of approver Lonnie Smith 10-18-91 Date approved 15. Status of well classification as: Oil Gas Suspended ~ -7~;~¢~ Service 17. I hereby certify ~that the foregoing is true and correct to the best of my knowledge. / / Si n.U FI- i,I. Or,,n, (,~' ~' ) FOR COMMISSION USE ONLY Conditions of approval: Noti y'~Commission so representative may witness Plug integrity ~ BOP Test~ Mechanical Integrity Test__ Approved by order of the Commission Form 10-403 Rev 06/15/88 Date//~ Location clearance ~ . , ~-~'.'~ I:~; I Approval No~.~/.. ~ ,~ Subsequent form required 10- ~-~'r.'ii~ i"i'.i..~'i:'ii'i LON~IIF ~, ~!TH ....... Commissioner Date //~'~/""' ~/ SUBMIT IN TRIPLICATE D~ 4-34 OBJECTIVE: A temporay suspension procedure is to be developed for DS 4-34 to effect an operational shutdown on the subject well per article 20 AAC25.~ of the Alaska Oil and Gas Commision. , ~','~ ~,.o WELL INFORMATION: A temporary suspension of DS 4-34 was decided as the appropriate course of action for the well after open hole logging information indicated that the Sadlerochit Lower Romeo Zones (lA & lB ) were absent in this target location. A re-drill of DS 4-34 is being proposed that would include the ~ of the intermediate hole to an alternate target location. DS 4-34 10. 1. M/U Halliburton EZSV to 3-1/2" DP 2. RIH to 13543'md ( 75' above 7-5/8" shoe) 3. Set EZSV @ 13543'md & establish injection. Note that fracture gradient is estimated at 14.5 to 15.0 ppg mud wt. equivalent. Predicted surface pressure to establish injection is estimated at 2300 - 2400 psig. 4. Start batch mix of 23 bbls (111.5 sxs ) of Dowell Schlumberger class G slurry. Note to use existing mix fluid on location. 5. Sting out of EZSV. 6. Pump 18 bbls of class G cement. 7. Drop drill pipe wiper plug, follow with 65 bbls of rig mud. 8. Sting back into EZSV ( cement bottom in drill pipe -- 6.1 bbls/923 ft. short of end of DP ) 9. Pump 19 rig mud (6 bbls mud + 13 bbls of G cement ) to fill up open hole volume Sting out of EZSV. Note: 5 bbls of cement in 3-1/2" drill pipe. 11. Pump 3 bbls. RECEIVED Alaska 0il & Bas Cons. Anchorage. 12. 13. 14. 15. DS 4-34 PRQCEDURE CONT'D Pull up 10 stands and circulate 1-1/2 annular volumes. Pooh, P/U 6-3/4" bit . RIH tag cement ( WOC time = 12 hrs ). Notify AOGCC inspector to witness tag. Note that Oct. 18, 91 is Alaska holiday for inspectors. POOH, secure well, install & test FMC dry hole tree- Prep rig for move to DS 4- 39 Note that derrick will need to be laid down for this rig move due to the pad level elevation change between DS 4-34 and DS 4-39. RECEIVED OCT 5 1 991 .al¢~,q<~ Oil ~.!?, (-;:~,s ~;ons. CommissiO~ TO: THRU: FROM: MEMORANDUM St ,[e of Alaska ALASKA OIL AND GAS CONSERVATION COMMISSION Lonnie C Smi~/ DATE: October 21 1991 Comm i s s loner ~ ' FILE NO: LG1021-6 .DOC TELEPHONE NO: Rig/BOPE Inspection Arco DS 4-34 Permit No. 91-54 Prudhoe Bay Unit Louis R Grimaldi Petr Inspector October,,,1.3, 1991 I made a rig/BOPE inspection on Nabor's Rig 28-E Drilling Well DS 4-34 for Arco in the Prudhoe Bay Unit. I found the rig to be in good shape and all BOPE equipment in place and operating. The surrounding location was neat and orderly, It should be noted that Arco has designated this drillsite as a H2S location and therefore the quarters and Co. Man's office are not on location. These are located on the adjoining Drillsite #DS-11 In summary~ the rig/BOPE inspection on Nabor's Rig 28-E revealed no non compliances and the rig should be in good shape for drilling, 02-00lA (Rev. 6/89) 20/I1LMEMO1.PM3 ALAS KA OIL AND GAS CONSERVATION COMMISSION TO: FROM: Lonnie C. Smith Commissioner Lou Grimaldi Petroleum Inspector DATE: I~'~1~ '''Q / OPERATION: Drlg )~..-. Wkvr UIC Operator... ~ ~ 0 Permit # ~/-~-'~' Location: See ~ T //~ R /~ M Drlg contr ~ / ~. ~ ~ ~ Rig~- ~ Location (gen'l) ~,, Well sign STATE OF ALASKA .,LASKA OIL AND GAS CONSERVAT I ON COMM IS~ BOPE Walk-Thru Inspection Report DATE: / 0- Representative Well name ~ Representative, IN COMPLIAN~Fa yes n__o A. DIVERTER 1. ( ) ( ) (Z~) line sz & length 2. ( ) ( ) (~) line corm & anchored 3. ( ) ( ) (~ bifurcated & dwn wind 4. ( ) ( ) (.0 90° targeted turns 5. ( ) ( ) (~) vlvs: auto & simultaneous 6. ( ) ( ) (4) annular pack-off 7. ( ) ( ) (~) condition 90° turns targeted (chke & kill ln) HCR vlvs (chke & kill) manual vlvs (chke & kill) connections (flgd, whd, clmpd) dr1 spool flow nipple flow monitor control lines fire protected B. BOP STACK 1. ~j~) ( ) ( ) wellhead flg wkg press 2.~.) ( ) ( ) stack wkg press 3. ~ ( ) ( ) annular preventer 4.~ ( ) ( ) pipe rams 5. (~ ( ) ( ) blind rams' 6. (~ ( ) ( ) stack anchored 7. (~ ( ) ( ) chke/ki11 line sz 8.(~ () 9. ~, ( ) lO.~ () 11. (?F () 12. (;<~) ( ) 13 (~j ( ) 14. (-~ () is. (~4 ( ) C. CLOSING UNITS ( ) wkg press ( ) fluid level ( ) oprtg press ( ) press gauges ( ) sufficient vlvs ( ) regulator bypass ( ) 4-way vlvs (actuators) ( ) ( ) blind handle cover ( ) ( ) driller control panel J~) remote control panel 1.(w) () 2. ('¢~ ( ) 3.~) () ~.~q) () 5. j~) ( ) 6.~) () 7. (;~) ( ) 8. ):x~ 10. ( ) ( ) RECORDS Date of last BOP inspection: Resulting failures: /~.~] O/L) ~ Failures not corrected & why: Date corrections will be completed: IN COMPLIANC~ yes n~o n/a 11.~ ( ) ( ) firewall 12.~<~ ( ) ( ) nitrogen power source (back-up) 13. ~) ( ) ( ) condition (leaks, hoses~ etc) D. MUD SYSTEM 1. ~(~ ( ) ( ) pit level floats installed 2. (~ ( ) ( ) flow rate sensors 3. {~ ( ) ( ) mud gas separator 4. (~ ( ) ( ) degasser 5.~ ( ) ( ) separator bypass 6. g~) ( ) ( ) gas sensor 7. (/~ ( ) ( ) chke In conn 8. ~ ( ) ( ) trip tank 1.~(~ () 2 () 3..~ () ~. () 5'D,~ () 6. () 7.~ () () E. RIG FLOOR ( ) kelly cocks (upper,lower,lBOP) ( ) floor vlvs (dart vlv, ball vlv) ( ) kelly & floor vlv wrenches ( ) driller's console (flow monitor, flow rate indicator, pit level indicators, gauges) ( ) kill sheet up-to-date ( ) gas ~etection monitors (H-S & methane) ( ) hydr chke panel ( ) chke manifold F. MISC EQUIPMENT 1. ()~ ( ) ( ) flare line 2' ~ ( ) ( ) vent line 4.() () s.~ () 6. () 7.~3 () 8.(~ () 9 () 90 ° turns targeted (dwn strm choke 1ns) reserve pit tankage personnel protective equip avail all drl site suprvs trained 2for procedures H S probes rig housekeeping Date of last BOP test: ~---~)--? // BOP test & results Properly entered on daily record? J Kill sheet current? C.0013 (rev 02/25/91) 'i DS-4 THIS SURVEY TllN, RI§E, U.M. VICINITY MAP ,, ,,, N.T.S. NOTES 1. BASIS OF LOCATION IS Tile RECORDED AS-BUILT POSITIONS OF EXISTING WELLS: . (W~LL i~S: 2,7,10,32,13,11,33,24 & 21). 2. COORDINATES SHOWN ARE ALASKA STATE PLANE ZONE 4. 3. ELEVATIONS SHOWN ARE ARCO DATUM (M.L.L.W.). 4. REFERENCE FIELD BOOK: PB 9~-06 (P. ~6 - 40) & PB 91-05 (P. ,36 - 43) DATE OF' SURVEY: 5/20-21/91 SURVEYOR'S CERTIFICATE RECEIVED JUN 1 4 199t CORRECT AS OF MARCH 25, 1991. Alaska 0il & Gas Cons. -, . LEGEND ~omm~ssion Anchorage · EXISTING ~LLS ~ 4,- CONDUCTOR AS-BUILT THIS ~A)RVEY LOCATED WITHIN PROTRACTED SECTIONS 26, 27 & ,35, T11N, R15E, UMIAT MERIDIAN, ALASKA. ,, , WELL A.S.P. PLAN T GE ODE Tl C CELLAR NO. COORDS. COORDS. POSITION BOX LOCATION DEV. IN SECTION 54 5,955,140.95 S 55~.56 70'16'29.893' 20.~ 1,264. FSL 712,972.86 E 1659.69 148'16'37.423' 180.2' FWL · 35 5,955,199.81 :S 470.07 70'16'.],01'475" 21.1 1,3~4' F 712,958.90 £ 1659.99 148'!6'57.760' 168' FWL 56 5,952,499.99 S 1190.18 70'16'23.548" 21.0 619' FSL 713,128.46 E 1659.82 148'16'33.422" 317' F'WL ... ..37 5,951,392.50 S 2.329.92 70'16'12.585" 31.3 496' FNL 713,597.42 E 1660.15 148.16'26.508" 553' FWL 38 5,952,236.75 S 1218.68 70'16'21.228 18.6 383' FSL 712,164.07 E 660.50 148'17'01.707" 655' FEL AS-BUILT AT NORTH SLOPE ] HEREBY CERTIFY THAT [ AM PRO- PERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION AND THAT ALL DIMEN- SIONS AND OTHER DETAILS ARE F. ROBERT BELL & ASSOC. ARCO Alaska Inc. 0 DRILL SITE 4 CONDUCTOR AS-BUILT WELLS #34, 35, 36, 37 &: 38 I0"^"'": ' IC~C~: 1'~: N T S I - ~ - PA2027AA ' ' ' ~ I TM ~:1~'""° ~: ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 April 16, 1991 John D. Gillespie Regional Drilling Engineer P. O. Box 100360 Anchorage, AK 99510-0360 Re'. Prudhoe Bay Unit DS 4-34 Permit No. 91-54 ARCO Alaska, Inc. Sur. Loc. 1263'FSL, 181'FWL, Sec. 26, TllN, R15E, UM Btmhole Loc. 1287'FNL, 1205'FEL, Sec. 25, TllN, R15E, UM Dear Mr. Gillespie: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additicmal permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE test that it wishes to witness. Sincerer, cDah~irdmaW~ J~~_~ Alaska Oil and Gas Conservation Commission BY ORDER OF THE COMMISSION dlf/Enclosures Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. " .... ', STATE OF ALASKA ALA~. ~ OIL AND GAS CONSERVATION C .~MISSION PERMIT TO DRILL 20 AAC 25,005 la. Type of work Drill [] Redrill [] I lb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen []I Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 64' feet 3. Address 6. Property Designation Prudhoe Bay Field P.O.Box 100360, Anchorage, AK 99510-0360 ALK 2322 ADL 28324 Prudhoe Bay Oil Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 1263'FSL, 181'FWL, Sec. 26, TI 1N, R15E, UM Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 1320' FNL, 1320'FWL, Sec. 25, TllN, RI5E, UM PBU DS 4-34 NO. U-630610 At total depth 9. Approximate spud date Amount 1287'FNL, 1205'FEL, Sec. 25, TllN, R15E, UM 05/10/91 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 1205' feet DS 4-20, 59' at 800'TVI~D 2560 13464'MD/8861'TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (d)(2)) Kickoff depth 500' feet Maximum hole angle 53.0 ° Maximum surface 2800 psig At total depth (TVD) 3825 psig 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 94# H-40 Weld 80' 35' 35' 112' 112' 280 sx CS II 13-1/2" 10-3/4" 45.5# L-80 BTC 4527' 33' 33' 4560' 3500' 1800 sx CS III/365 sx CL 9-7/8" 7-5/8" 29.7#] ,-80 B"I C/BTC M£ .D 1322~)' 31' 31' 13251' 8734' 280 sx CI G/250 bbls MTC 6-3/4" 5-1/2" 17# L-80 BTC 513' 12951' 8553' 13464' 8861' 220 sx CIG Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor iSn;reframC diate R E IV E D Production Liner APR 1 1 t991 Perforation depth: measured Alaska 011 & Gas Cons. C0mmiSSi0n true vertical Anchorage 20. Attachments Filing Fee [] Property plat [] BOP Sketch I-~I' Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements [] 21. I hereby certify that the foregoing is true and correct to the best o~/fny knowledgg~-~~ //) t/' "~y~ Commission T i t I e ~'.~ ,.z~--,.-,~//.~ ~.~,¥/~, ~.~¢'-~.I >,?~" Date Permit J~mber ' J APl number Appro d See cover letter ' ~'/- ~"'~7<' J 50- O ~_ '~ - .~.~ 2~//.~'d;)' J v~j~""'~ ..' 4/ [ for other requirements Conditions of approval Samples required [] Yes_]~ No Mud log required [] Yes ~ No Hyclrogensulfide measures [] Yes ~ No Directional survey required'~ Yes [] No Required working pressure for BOPE [] 2M; [] 3M; ~ SM; [] 10M; [] 15M Other: ~ --- by order of Approv Commissioner the commission Date Form 10-401 Rev. 12-1-85t,' Submit in triplicate PBU DS 4-34 OPERATIONS SUMMARY 1. MIRU ddlling dg. NU diver[er and function test same. 2. Ddll 13-1/2" hole to 500 ' 'r'VD/MD. 3. Kick off and build angle, at 2.5 degrees/100 ft. to a final inclination angle of 52 deg.58'. @ 2329' TVD/ 2618' MD. 4. Ddll to 4560' MD / 3500' 'rVD and run and cement 10-3/4" casing. Nipple up BOPE and test to 5000 psi. 5. Pick up 9-7/8" BHA and RIH. Test casing to 3000 psi for 30 minutes. Ddl110' of new hole and perform leakoff test. 6. Ddll 9-7/8" hole to 8734"1'VD, 13251 'MD,( 10' TVD above Sadlerochit top). 7. Set 7-5/8" Casing and cement same. 8. Pick up 6-3/4" BHA ,GIH. Test casing to 3000 psi. 9. Drill 10' of new hole and perform EMW test. 10. Drill 6-3/4" hole to TD @ 8861' TVD, 13464'MD, condition hole to run OH logs 11. Run wireline logs as programmed. 12. Set 5-1/2" liner and cement same. 13. Clean out the liner and test liner to 3000 psi for 30 minutes. Circulate well to brine. N/U Dry hole tree and test to 5000 psi. Release Ddlling Rig. 14. Run cased hole logs. 15. Move in with Completion rig and run 4-1/2" tubing and packer assembly with GLMs,and SSSV. Test tubing and casing to 3000 psi. Freeze protect with diesel. 16. N/U tree and test to 5000 psi. Release Completion rig. Rig up Wimline and perforate. o Antcipated BHP: 3825 psi (8.4 ppg EIVlW) @ 8800' TVD o Maximum Anticipated Surface Pressure: 2800 psi o Planned Completion Fluid: 9.3 ppg Brine I ECEIVED Ala$1m Oil & Gas Cons. Cummi~sior~ Anchorage DS 4-34 OPERATIONS SUMMARY CONTINUED NOTE; Excess non-hazardous fluids developed from the well operations and as necessary to control the reserve pit fluid level will be pumped down the 7-5/8" x 10-3/4" annulus. The annulus will be left with a non-freezing fluid during any extended pedod. The annulus will be sealed with 300 sx of cement followed by Arctic Pack. b. Minimum distances of wells within 200 ft. of the proposed well am: o DS 4-20 '59.06' @ 600' MD / 600q'VD c. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.033. d. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/ft). e. Based on previous logs on DS 4, no potential productive zones am antidpated above 3500' TVD. f. No potential hazardous levels of H2S am antidpated in this well. RECEIVED ~aa Cons, Commission AnchOrage DS4~4 MUD PROGRAM DEPTH DENSITY VIS YP INT 10MIN FL OIL SOLIDS (TVD) (PPG) GELS GELS CC/30MIN (%) (%) MUD TYPE SPUD 8.8 300 70 30+ 50+ 25 0 2 to to to to to 13-3/8" 9.2 100 40 6 csg pt. SET 10-3/4 "CASING GEL-BENEX SPUD MUD DEPTH DENSITY PV YP INT 10 min FL OIL SOLIDS MUD (TVD) (PPG) (CP) (#/ft GEL GEL ccJ30min (%) (%) TYPE 13-3/8" 8.7 10 6 2 4 25 0 2 LIGHTLY to to to to to to to to TREATED 5000 9.0 15 16 4 10 10 9 POLYMER 5000 9.0 15 16 4 10 10 0 9 LIGHTLY to to to to to to to to TREATED 9-5/8" 10.0 20 25 6 12 6 11 POLYMER csg pt. SET 7-5/8 "CASING DEPTH DENSITY PV YP INT 10 min FL OIL SOLIDS MUD (TVD) (PG) (CP) (#/ft) GEL GEL cc/30min (%) (%) TYPE 9-5/8" 8.7 10 6 2 1 8 0 4 LIGHTLY to to to to to to to to TREATED TD 9.2 15 10 4 10 6 6 POLYMER SET 5-1/2" UNER THIS MUD PROGRAM IS ONLY A GUIDELINE. ACTUAL HOLE CONDITIONS WILL DICTATE THE ACTUAL MUD PROPERTIES. e£CEIVE Alaska 0]i & Gas Cons. L;01~nlJssJor! Anchorage PIT #1 130 BBLS PIT #2 81 BBLS PIT #5 117 BBLS PI?.?. PIT 20 BBLS PIT #6 135 BBLS NABORS 28E SYSTEM TRIP TANK 170 BBLS PIT #3 137 BBLS PIT $4 179 BBLS EQUIPmeNT - DRILLING FLUID SYSTEM (3) DERRICK FIX)-LINE C~.~.%NER (1) DERRICK ~ ~.~.a/~ER (1) BRANDT CF-2 CENTRIFUGE (1) PIONeeR MARK I CENTRIFUGE (1) RIG BUILT GAS BUSTER (1) DRILCO DEGASSER (1) P~T SENSOR PER PIT w/ visual and audio warning devices (1) AGITATOR PER PIT (1) DRILLING FIX)W SHOW SENSOR W/ readout convenient to the driller's console RECEIVED ~PR 17 t~gl · 4ia~ka Oil & (~as Cons. Commission 'Anchorage NABORS 28E DIVERTER SYSTEM ARCO ALASKA, INC. FILL-UP UNE RISER FLOWUNE I 2(7' :2O(X) PSI DIVERTER I 1(7' BALL VALVE I I 1(7' BALL VALVE I I CONDUCTOR I NOTE: ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDmONS REQUIRE THE USE OF THE SECOND VENT LINE. THE SECOND VENT LINE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS THIS IS A VARIANCE FROM 20AAC25.035. RESERVE PIT 1(7' VENT LINE 1(7' VENT UNE DIVERTER LINES DISCHARGE 100 FT. FROM RIG IGNITION SOURCE. ALL TURNS ARE TARGETED TEES APR 11 ]99~ Oil & 6a~ Con~. Commission ~Ai~gh~r~nn 13-5/8" 5000 psi BOP STACK DIAGRAM I PIPE RAM BLIND [ SPOOL CASING SPOOL BRADEN HEAD & ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVIOR TO THE PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT THE ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH THE CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRES- SURE. 13-5/8" STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH A NON-FREEZING FLUID. 2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED. MARK THE RUNNING JOINT WITH PREDETERMINED PLUG SEATING DEPTH. RUN THE TEST PLUG ON DRILL PIPE AND SEAT IN WELL- HEAD. 3. CLOSE ANNULAR PREVENTER AND UPSTREAM VALVES. 4. FUNCTION TEST CHOKES. 5. IN EACH TEST, FIRST HOLD 250 PSI FOR 3 MINUTES PRIOR TO THE HIGH PPRERSSURE TEST. 6. INCREASE PRESSURE ON ANNULAR TO 3000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 7. OPEN ANNULAR PREVENTER AND CLOSE TOP PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 8. CLOSE VALVES DIRECTLY UPSTREAM OF THE CHOKES AND OPEN CHOKES. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 9. OPEN TOP SET OF PIPE RAMS. CLOSE BOTTOM PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. 10. TEST REMAINING MANIFOLD VALVES (IF ANY) WITH 5000 PSI UPSTREAM OF THE VALVE AND ZERO PRESSURE DOWNSTREAM. 11. BLEED PRESSURE TO ZERO. OPEN BOTTOM PIPE RAMS. 12. BACK OFF RUNNING JOINT AND POH. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 3 MINUTES. 13. BLEED OFF ALL PRESSURE. OPEN BLIND RAMS. FILL MANIFOLD AND LINES WITH NON-FREEZING FLUID. SET ALL VALVES IN THE DRILLING POSITION. 14. TEST STANDPIPE VALVES TO 5000 PSI. 15. CHECK DEGASSER OPERATION. 16. RECORD BOP TEST INFORMATION ON THE BOP TEST FORM SIGN AND SEND TO DRILLING SUPERVISOR. 17. PERFORM COMPLETE BOP TEST WEEKLY AND FUNCTION TEST DAILY. ............. :,~,- ~-~ .... 0 'RICB F']'~3VATION 64' ~o~ ~_~ AR(20 ALASKA, I~C. '~ DS4 34BHL,'[B 1o.o ~?.s SHL: U liN 15E 26 1263' F~;L 181' FWL ~'~.o THL: U llN 15E25 1320' F/4'L 1320' FEI., z~.s ' BHL: U lin 15E25 1287' F]qL 1205' FEL ~.~ N73 25' 2ooo ~ 47J 10-:[/4" Casing TVD=3500 TMD~560 DEP=2461 ~ AVERA ~2 58' 7000 ~ ~'.,, ..~,~,--.,,~, ..~,.-.- ..... D~--7117 ~KI0 'I'V~7534 TMI~11257 D1~=-7807 8000 ~T" rD=8089 TMD= 12179 DEP=8544 '-5~8' Casing TVD=8734 "H~13251 DEP---9399 t P S~,DL~Oc-~rr TVD=~ 44 TMD=132~ ~ ....... TARGET TVD=8'"72 TMD=I3314 DEP-- )4.50 ~ ~ S~tlerochit TVD=8772 "r/~13314 DEP-~450 rlO~Orc~t~ TARGET 'I'VD=IE~/2 TMI~13314 ElE~-~449 ~g~,lletoe3~ TVI~2 T/,11~13314 ~9 TARGET TVI~E72 TM1~13314 TI:) ~ g861 TMI~13464 DirrJ -~'9569 10000 ........................................................... qAAA 7000 8000 9000 100O0 11000 12000 13000 14000 VERTICAL SECTION ARCO ALASKA, INC. DS4-34BHL4B N73 25'E 1000 04-20 04-21 < o4~r3 04-19 -1 , E - W COORDINATES 30OO 4O0O 7147 1000 ' -1000 ...... ~ ...... ,,-~OOOoooo ~ECEIV£b APR 11 Alaska 0il & ~ia$ Cons. Commission AnChorage ITEM (1) Fee (2) Loc ** CHECK LIST FOR NEW WELL PERMITS ** APPROVE DATE. 4, [10 & 13] (4]) Casg [ 14 thru [23 thru 28] [29-'thru~ (6) Other/~'~_f/~. ~ 6. 7 8 e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Company YES Is permit fee attached ............................................... /~ . Is well to be located in a defined pool .............................. Is well located proper distance from property line ................... Is well located proper distance from other wells ..................... p .... Is sufficient undedicated acreage available in this pool ............. Is well to be deviated & is wellbore plat included ................... Is operator the only affected party.. .............. ~ . Can permit be approved before 15-day wait Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease nunber appropriate .......................................... Does well have a unique name & nunber ................................ 'Z~ .. Is conductor string provided ......................................... .,~.. Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. ~-~ Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... ..~ .... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to <~'o~o psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... . .... FOR EXPLORATORY & STRATIGRAPHIC WELLS' Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. NO REMARKS CD DWJ_4~ RP~//~ eng i neer i ngj: LCS' BEW~ RAD___~_ dH~-~ rev 03/29/91 jo/6.011 I~'ITIAL GEO1 UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE Additional remarks' Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. **** LIS READ **** (NOTE: MAXIMUM RECORD LENGTH - 8192 BYTES) ** REEL HEADER ** REEL SEQUENCE # 1 SERVICE NAME: PETCOM DATE: 92/04/16 ORIGIN OF DATA: MPT REEL NAME: PBUDRILL CONTINUATION #: 01 PREVIOUS REEL NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ** TAPE HEADER ** SERVICE NAME: MPT DATE: 92/04/16 ORIGIN OF DATA: SHFT TAPE NAME: DS 4-34 CONTINUATION #: 01 PREVIOUS TAPE NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ********** END OF FILE (EOF # 1) ********** RECEIVED JUN 0 8 1992 Alaska Oil & Gas Cons. Commission Anchorage ** FILE HEADER ** FILE NAME: 434ORIG SERVICE NAME: MPT VERSION #: N/A DATE: 92/04/16 MAX. RECORD LENGTH: FILE TYPE: E1 PREVIOUS FILE NAME: ** COMMENTS ** FILE SEQUENCE # 1 1024 LDWG PRE-FORMAT TAPE SEQUENCE FILE ONE IS ORIGINAL DATA SEQUENCE FILE TWO IS DATA SHIFTED PER AAI INSTRUCTIONS ** DATA FORMAT SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 1 4 0 1 68 GRC MPT API 0 0 0 0 1 4 0 1 68 EWR OHMM 0 0 0 0 1 4 0 1 68 ROP FT/H 0 0 0 0 1 4 0 1 68 DATE 0 0 0 0 1 4 0 1 68 TIME 0 0 0 0 1 4 0 1 68 FXE HOUR 0 0 0 0 1 4 0 1 68 DDE PPF 0 0 0 0 1 4 0 1 68 TEMP DEGF 0 0 0 0 1 4 0 1 68 ** DATA FORMAT SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 1 4 0 1 68 GRC MPT API 0 0 0 0 1 4 0 1 68 EWR OHMM 0 0 0 0 1 4 0 1 68 ROP FT/H 0 0 0 0 1 4 0 1 68 DATE 0 0 0 0 1 4 0 1 68 TIME 0 0 0 0 1 4 0 1 68 FXE HOUR 0 0 0 0 1 4 0 1 68 DDE PPF 0 0 0 0 1 4 0 1 68 TEMP DEGF 0 0 0 0 1 4 0 1 68 ** DATA VERIFICATION (every 100 FT) DEPT GRC EWR ROP DDE TEMP DATE TIME FXE 9750.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 9800.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 9900.000 59.433 4.947 -999.250 106.342 86.404 911007.000 721.400 1.791 10000.000 57.153 2.273 .353 113.812 -999.250 911007.000 14591.750 1.529 10100.000 84.632 3.796 1.176 116.135 65.797 911007.000 25720.000 1.487 10200.000 64.147 2.078 -999.250 118.646 50.835 911007.000 32365.000 .859 10300.000 63.625 2.922 -999.250 118.646 227.103 911007.000 38442.000 1.357 10400.000 66.195 4.220 .131 122.162 207.887 911007.000 41156.590 .452 10500.000 66.485 2.854 .096 122.162 119.078 911007.000 44760.000 .456 10600.000 66.450 2.874 .275 122.162 125.391 911007.000 51358.000 1.389 10700.000 80.437 3.154 -999.250 125.677 119.265 911007.000 55969.000 .696 10800.000 86.975 3.419 .705 122.162 156.397 911007.000 61060.000 .829 10900.000 76.559 3.425 -999.250 123.920 118.573 911007.000 71317.000 1.384 11000.000 82.087 2.581 .325 125.677 92.285 911007.000 79691.000 1.345 11100.000 81.328 3.223 .202 123.920 137.069 911008.000 1143.200 1.370 11200.000 87.273 3.513 -999.250 127.435 11300.000 91.013 4.879 -999.250 122.162 129.278 911008.000 6945.000 86.652 911008.000 24524.000 .819 4.130 11400.000 97.127 4.248 119.287 911008.000 32396.000 1.538 2999.250 123.920 11500.000 98.816 .184 127.435 2.284 131.523 911008.000 39189.000 .803 11600.000 90.142 .315 123.920 3.839 143.428 911008.000 49771.000 2.552 11700.000 113.436 .592 125.677 3.592 78.261 911008.000 57394.460 1.551 11800.000 75.995 .375 132.123 2.109 76.173 911008.000 62603.000 .769 11900.000 84.561 -999.250 130.292 2.843 41.550 911008.000 70576.750 1.189 12000.000 91.696 -999.250 130.951 2.754 112.381 911008.000 75331.250 .822 12100.000 74.089 .280 134.466 3.135 100.254 911008.000 80248.250 .812 12200.000 78.297 .238 134.466 12300.000 81.730 · 312 136.224 12400.000 171.825 -999.250 136.224 12500.000 113.382 .480 139.740 3.213 2.152 4.357 6.954 98.543 911008.000 125.126 911009.000 121.473 911009.000 67.477 911009.000 85321.000 3324.000 8535.199 20557.500 .714 .629 .741 1.477 12600.000 158.231 .392 141.498 12700.000 116.581 .543 137.982 12800.000 142.226 .402 139.740 3.814 7.756 4.057 79.870 911009.000 27509.000 -999.250 911009.000 52702.500 87.758 911009.000 59180.590 1.218 1.859 .984 12900.000 125.359 .452 141.498 3.923 75.884 911009.000 66237.500 .938 13000.000 107.874 .476 139.740 7.147 48.507 911009.000 74364.000 1.251 13100.000 132.248 .885 141.498 5.578 61.709 911009.000 82436.000 1.386 13200.000 72.884 .409 143.255 13300.000 163'387 .358 146.771 12.458 6.616 50.817 911010.000 74.169 911010.000 4464.801 12494.000 1.200 1.388 13400.000 199.117 8.348 -999.250 911010.000 20059.000 1.143 .'737 148.529 13500.000 258.887 6.883 .459 147.650 64.689 911010.000 30016.000 1.673 13600.000 -999.250 -999.250 -999.250 -999.250 37.630 -999.250 -999.250 -999.250 13700.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** 283 DATA RECORDS ** FROM 9750.00 TO 13700.00 FT ** FILE TRAILER** FILE NAME: 434ORIG SERVICE NAME: MPT VERSION #: N/A DATE: 92/04/16 MAX. RECORD LENGTH: FILE TYPE: E1 NEXT FILE NAME: 1024 ********** END OF FILE (EOF # 2) ********** ** FILE HEADER ** FILE SEQUENCE # 2 FILE NAME: 434SHFT SERVICE NAME: MPT VERSION #: N/A DATE: 92/04/16 MAX. RECORD LENGTH: FILE TYPE: SH PREVIOUS FILE NAME: ** COMMENTS ** 1024 SHIFTED DATA PER AAI INSTRUCTIONS ** DATA FORMAT SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 2 4 0 1 68 EWR OHMM 0 0 0 0 2 4 0 1 68 ROP FT/H 0 0 0 0 2 4 0 1 68 DATE 0 0 0 0 2 4 0 1 68 TIME 0 0 0 0 2 4 0 1 68 FXE HOUR 0 0 0 0 2 4 0 1 68 DDE 0 0 0 0 2 4 0 1 68 TEMP DEGF 0 0 0 0 2 4 0 1 68 SHFT FT 0 0 0 0 2 4 0 1 68 GRC API 0 0 0 0 2 4 0 1 68 ** DATA FORMAT SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 2 4 0 1 68 EWR OHMM 0 0 0 0 2 4 0 1 68 ROP FT/H 0 0 0 0 2 4 0 1 68 DATE 0 0 0 0 2 4 0 1 68 TIME 0 0 0 0 2 4 0 1 68 FXE HOUR 0 0 0 0 2 4 0 1 68 DDE 0 0 0 0 2 4 0 1 68 TEMP DEGF 0 0 0 0 2 4 0 1 68 SHFT FT 0 0 0 0 2 4 0 1 68 GRC API 0 0 0 0 2 4 0 1 68 ** DATA VERIFICATION (every 100 FT) ** DEPT EWR ROP DATE TEMP SHFT GRC 9750.000 -999.250 -999.250 -999.250 -999.250 9750.000 -999.250 9800.000 -999.250 2.510 -999.250 -999.250 9795.953 62.511 9900.000 4.521 80.733 911007.000 106.342 9893.285 68.535 10000.000 2.693 111.615 10000.130 24.000 911007.000 57.744 10100.000 4.029 118.256 10084.310 25.824 911007.000 94.549 10200.000 1.713 118.646 10183.800 152.998 911007.000 48.306 10300.000 3.817 119.023 10282.310 195.820 911007.000 87.292 10400.000 2.515 120.404 10381.410 310.535 911007.000 69.565 10500.000 2.926 123.920 10479.760 190.017 911007.000 87.612 10600.000 2.357 123.920 10583.620 76.141 911007.000 80.944 10700.000 2.364 125.677 10681.900 80.908 911007.000 92.172 10800.000 2.533 120.843 10779.800 184.664 911007.000 80.116 10900.000 2.583 127.435 10887.410 49.220 911007.000 81.018 11000.000 2.971 125.677 10998.970 90.784 911007.000 99.834 11100.000 3.223 123.920 11100.120 137.069 911008.000 95.237 11200.000 3.513 127.435 11200.110 129.278 911008.000 96.546 11300.000 4.879 122.162 11300.100 86.652 911008.000 99.059 TIME -999.250 -999.250 1028.000 15590.000 27438.000 32649.530 38842.930 42394.250 45516.360 52219.000 56424.000 64217.490 73396.000 79781.000 1143.200 6945.000 24524.000 FXE -999.250 -999.250 1.837 1.342 1.545 .515 .705 .628 .512 1.363 .663 1.403 1.677 1.332 1.370 .819 4.130 DDE -999.250 -999.250 .885 .491 .231 .146 .143 .168 .162 .270 .190 .730 .367 .312 .202 .316 .856 11400.000 4.248 119.287 911008.000 32396.000 1.538 .339 123~920 11400.100 11500.000 2.284 127.435 11500.090 11600.000 3.839 123.920 11600.080 11700.000 3.592 125.677 11700.070 108.122 131.523 911008.000 105.873 143.428 911008.000 99.326 78.261 911008.000 121.679 39189.000 49771.000 57394.460 .803 2.552 1.551 .184 .315 .592 11800.000 2.109 132.123 11800.060 76.173 911008.000 62603.000 83.870 .769 .375 11900.000 2.843 130.292 11900.050 41.550 911008.000 70576.750 91.818 1.189 .296 12000.000 2.754 130.951 12000.050 112.381 911008.000 75331.250 96.817 .822 .239 12100.000 3.135 134.466 12100.040 100.254 911008.000 80248.250 84.127 .812 .280 12200.000 3.213 134.466 12200.030 98.543 911008.000 85321.000 86.975 .714 .238 12300.000 2.152 136.224 12300.020 125.126 911009.000 3324.000 95.678 .629 .312 12400.000 4.357 136.224 12400.010 121.473 911009.000 8535.199 186.826 .741 .400 12500.000 6.954 139.740 12500.010 67.477 911009.000 20557.500 121.730 1.477 .480 12600.000 4.217 141.498 12600.000 84.204 911009.000 27530.000 172.717 1.217 .375 12700.000 6.582 137.982 12699.990 225.959 911009.000 52734.000 120.468 1.859 .510 12800.000 4.359 139.740 12799.980 85.645 911009.000 59205.800 164.942 .956 .403 12900.000 4.069 141.498 12899.970 77.738 911009.000 66328.000 135.764 .958 .452 13000.000 6.594 140.179 12999.960 50.750 911009.000 74395.500 120.487 1.250 .469 13100.000 5.590 143.255 13099.960 55.850 911009.000 82562.000 146.716 1.402 .917 13200.000 13.704 143.607 13199.950 13300.000 6.981 146.771 13299.940 38.920 911010.000 4515.200 100.407 66.683 911010.000 12536.000 186.126 1.190 1.385 .413 .358 13400.000 8.348 62.237 911010.000 20059.000 1.143 .737 148 529 13400.330 218.094 13500.000 1.868 148.529 13504.140 54.119 911010.000 29455.000 1.571 297.831 .534 13600.000 -999.250 -999.250 13601.850 48.047 -999.250 -999.250 -999.250 -999.250 -999.250 13700.000 -999.250 -999.250 13700.000 -999.2.50 -999.250 -999.250 -999.250 -999.250 -999.250 ** 317 DATA RECORDS ** FROM 9750.00 TO 13700.00 FT ** FILE TRAILER** FILE NAME: 434SHFT SERVICE NAME: MPT VERSION #: N/A DATE: 92/04/16 MAX. RECORD LENGTH: FILE TYPE: SH NEXT FILE NAME: 1024 ********** END OF FILE (EOF # 3) ********** ** FILE HEADER ** FILE NAME: 434DIR SERVICE NAME: MPT VERSION #: N/A DATE: 92/04/16 MAX. RECORD LENGTH: FILE TYPE: SH PREVIOUS FILE NAME: ** COMMENTS ** FILE SEQUENCE # 3 1024 DIRECTIONAL INFORMATION ** DATA FORMAT SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNIT API API API API ID ORDER# LOG TYP CLS MOD DEPT FT 0 0 0 0 TVD FT 0 0 0 0 NDIS FT 0 0 0 0 EDIS FT 0 0 0 0 DEVI DEG 0 0 0 0 FILE SZE PROC SPL REPR NO. LVL CODE 3 4 0 1 68 3 4 0 1 68 3 4 0 1 68 3 4 0 1 68 3 4 0 1 68 ** DATA FORMAT SPECIFICATION ** ENTRY BLOCKS TYPE SIZE REP CODE ENTRY 4 1 66 255 0 1 66 DESCRIPTION LOG DIRECTION, DOWN TERMINATOR (NO MORE ENTRIES) DATUM SPECIFICATION BLOCKS NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 3 4 0 1 68 NDIS EDIS DEVI FT FT FT DEG 68 68 68 68 ** DATA VERIFICATION DEPT TVD 9750.000 6617.146 9800.000 6642.396 9900.000 6694.045 (every 100 FT) NDIS EDIS DEVI 53.013 185.990 59.700 64.525 227.583 59.509 88.384 309.817 58.300 10000.000 6747.491 113.586 390.487 57.090 10100.000 6802.388 139.749 469.871 56.531 10200.000 6857.719 165.904 548.955 56.280 10300.000 6913.414 191.982 627.809 56.031 10400.000 6969.469 217.986 706.433 55.815 10500.000 7025.512 244.250 784.979 56.013 10600.000 7081.269 271.021 863.556 56.210 10700.000 7136.740 298.300 942.161 56.407 10800.000 7191.933 325.527 1020.980 10900.000 7246.853 352.216 1100.173 11000.000 7301.499 378.360 1179.735 11100.000 7355.999 404.139 1259.517 11200.000 7410.586 429.892 1339.249 11300.000 7465.265 455.626 1418.923 11400.000 7520.116 481.315 1498.492 11500.000 7575.407 506.874 1577.799 11600.000 7631.158 532.296 1656.828 11700.000 7687.298 557.385 1735.688 11800.000 7743.416 580.968 1815.024 11900.000 7799.444 602.836 1894.914 12000.000 7855.370 623.076 1975.303 12100.000 791o.993 643.366 2055.891 12200.000 7966.240 664.308 2136.570 56.594 56.781 56.968 56.948 56.885 56.822 56.592 56.276 55.959 55.831 55.894 55.957 56.074 56.333 56.592 12300.000 8021.123 685.910 2217.324 56.762 12400.000 8076.075 708.210 2297.840 12500.000 8131.307 731.223 2377.964 12600.000 8186.816 754.938 2457.690 12700.000 8242.551 779.012 2537.151 12800.000 8298.471 803.182 2616.453 12900.000 8354.576 827.448 2695.594 13000.000 8410.643 852.373 2774.557 13100.000 8466.391 878.666 2853.302 13200.000 8521.816 906.333 2931.803 13300.000 8576.871 935.363 3010.072 13400.000 8631.447 965.731 3088.167 13500.000 8685.541 997.443 3166.066 13600.000 8739.197 1030.365 3243.765 13700.000 8792.779 1063.491 3321.428 159 DATA RECORDS ** ** FILE TRAILER** FILE NAME: 434DIR SERVICE NAME: MPT VERSION #: N/A DATE: 92/04/16 MAX. RECORD LENGTH: FILE TYPE: SH NEXT FILE NAME: 1024 FROM 56.570 56.378 56.191 56.064 55.936 55.807 56.008 56.230 56.451 56.757 57.088 57.418 57.600 57.600 9750.00 TO 13700.00 FT ********** END OF FILE (EOF # 4) ********** ** TAPE TRAILER** SERVICE NAME: MPT DATE: 92/04/16 ORIGIN OF DATA: SHFT TAPE NAME: DS 4-34 CONTINUATION #: 01 NEXT TAPE NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ** REEL TRAILER ** SERVICE NAME: PETCOM DATE: 92/04/16 ORIGIN OF DATA: MPT REEL NAME: PBUDRILL CONTINUATION #: 01 NEXT REEL NAME: COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT ********** TAPE TERMINATED BY REEL TRAILER ********** SSVd NI%~4 I~OH N~80 H~G¥~H ~Id 'NOII¥IAMG GN¥ IZIS M~OH Oi MQG GMSQ iON DNIMdS MOR 'S~SO~M~d X~G ~O~ G~A¥~SIG ~ Sknf~D~I~ ~OOi HiOq '~SNOdS~ XtIH~A Oi E 'ON 8I~ ~0~ G~DNYHD ~OOi it~{ tf~B4¥D DO% NO G~ION DNI~DIIS %O01 'SISSWd %~W NO G~HD¥~ iON tq4BI~D S~O~NIANOD ~0~ E 'ON SS~d NOel ,g8~[I A~ SS~d NI~ Oi NO G~DIqdS i~ ~9 ~0 NOIID~S ~%OH G~S~D (NMOG DNIOD ~%I~ DNIddOIS %OO~) '~SNOdS~ X~ ~O fHi DNIADI~i~ NOIA~Oi ~0 NOIA~AIAD~ NO~I~N (I6-1DO-9I) 00:90 :G~OIS NOII~DRID OS/. '9 0 ' 0~8£I §E9 '£ 000 '0 S, HI~I~I I%{G DNI SYD ,~IOH 00 'I~ 00'ES 00'£§ £9EI ~I NIT 9E DNINiS NOIiDQGONd DNINAS G~£ DNIHiS GNE DNINAS iSI :%aAa% GN~OND :DNIHSQ~ (0 %S~'~O~ :%M~ :~Sd : ~Nd :dIHSN~Oi qH~O '£ §6L680 NOIJ,¥DO~I : SS~NJ, IM : %t~.~NIDN.~ DNIDDO% : ~tlS~IQN ~O£ £ NnH E NnH I NfR{ 16-1DO- 8 g S~qO IA%{,~ S ~qNI~II%tlM · DNI ' t~ISt~I¥ OD~f 0009IEE6E00§ lVI IgtHo · paA~S~ s~qBT~ II¥ Ail tool strings; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE depth shifted and clipped curves; 0.5000 START DEPTH STOP DEPTH all runs merged; no case BCS 13619.0 DIL 13619.0 2435 13619.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA BASELINE DEPTH 13632.5 13629.5 13633.0 13630.0 13633.5 13631.0 13634.5 13632.0 13641.0 13638.0 13642.0 13639.0 13642 . 5 13640.0 13643.0 13640.5 13644.0 13641.0 13644.5 13641.5 13648.0 13648.0 13689.0 13687.0 13709.0 13707.0 13748.0 13748.0 $ MERGED DATA SOURCE PBU TOOL CODE RUN NO. BCS DIL 2435 $ REMARKS: 13877.0 13877.0 13778.0 BCS GR (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH RFOC RILM RILD 13629.5 13629.5 13630.0 13630.0 13631.0 13631.0 13632.0 13632.0 13638.0 13638.0 13639.0 13639.0 13640.0 13640.0 13640.5 13640.5 13641.0 13641.0 13641.5 13641.5 13648.0 13648.0 13687.0 13687.0 13707.0 13707.0 13748.0 13748.0 PASS NO. MERGE TOP MERGE BASE 1 4 13619.0 13877.0 1 4 13619.0 13877.0 1 2 13619.0 13778.0 ONLY DIL CURVES NEEDED SHIFTING TO MATCH GR FROM BCS. $ ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Code Samples Units Size Length DT FUCT GR ILD ILM LL8 MTEM NPHI 68 1 US/F 4 4 68 1 CPS 4 4 68 1 GAPI 4 4 68 1 OHMM 4 4 68 1 OHMM 4 4 68 1 OHMM 4 4 68 1 DEGF 4 4 68 1 PU-S 4 4 s~TJq E9 :q~Du~I p~oo~ mn~Tx~N :q~6u~I p~oo~J mn~uTN s~n$~p 0089 89 :spoo :Xa~mmns 6uTpoDsp spom UOT~u~ssad~ 00000§'0 = 6UTowds I~A~ ~IT~ odwl 000000'619£I = q~d~G pu~ ~I!~ ~d~ 000000'088£I = q~d~Q ~P~S ~IT~ ~d~ 8~ : spaoo~t w:~G I~$Ol ~ 8% I 89 SN~I EI ~ 8~ I 89 GNmA II ~ AI4 I 89 dS 0I ~ SdD I 89 ~D~N 6 Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH 2435 13400.0 13618.0 $ BASELINE CURVE FOR SHIFTS: BCS GR CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ REMARKS: NO SHIFTS REQUIRED FOR CASED HOLE SECTION. $ ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Code Samples Units Size Length 1 FUCT 68 1 CPS 4 4 2 GRCH 68 1 GAPI 4 4 3 NPHI 68 1 PU-S 4 4 4 NUCT 68 1 CPS 4 4 5 TEND 68 1 LB 4 4 6 TENS 68 1 LB 4 4 * DATA RECORD (TYPE# 0) 1014 BYTES * 24 Total Data Records: 13 Tape File Start Depth = 13618.000000 Tape File End Depth = 13400.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIE representation code decoding summary: Rep Code: 68 3060 datums Tape Subfile: 3 40 records... :q~BuwI p~oo~a mnm~x~ :Y~BuwI p~o=w~ mnm~u;~ Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE M3~IN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 4 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH BCS 13390.0 DIL 13390.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 13877.0 13877.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP PCM GR AC DIFL CHT MIS TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE PULSE CODE MODULATOR GAMMA RAY ACOUSTIC LOG DUAL IND FOCUSED LOG CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR ACOUSTIC LOG DUAL IND FOCUSED LOG 16-OCT-91 FSYS256 REV:G002 600 16-OCT-91 1430 16-OCT-91 13840.0 13846.0 13400.0 13618.0 o.o TOOL NUMB 3974 3967 2806 3506 1309 1609 1503 3974 3967 2806 1309 2435 3506 1609 1503 BOREHOLE AND CASING DATA OPEN HOLE DIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT): 6.750 13818.0 13619.0 BOREHOLE CONDITIONS :A~mmns 6u!pomap apom uo!~u~s~d~u %oa~ = s~IuR q%doG OIT~ od~L 0000§Z'0 = BuIowds IOAa~ oII~ od~L 000000'68££I = q~doo puz oI!~ O00000'£LSgI = q~d~o ~S ~IT~ ~d~ 0'0 0'89 0'0 0 '89 0 '09I 0 '89 O~ ~ s~zx~ 8T0Z (0 #maxz) ~ ~ ~% I 89 NZL~ 0I ~ % NN/~ I 89 OdS 8 ~ ~ AN I 89 dS ~ ~ Bg4HO I 89 ~IM 9 ~ ~ N~O I 89 O~IH ~ ~ ~HO I 89 ~O~H ~ ~ Id~D I 89 ~O q~6ua% ~z!s s%!u~ ssld~s ~poo ~m~N 'SaAlnD 0I J :OI qjdap ~d~i 0'0 000'0 00'0 ZNOISQN~S 000 '0 06§'I 000 '0 0gI 'I 8£§ '0 06E 'I 0'09I §'§ C'II 0'9~ 08'6 %%IMO MZN 'NO%t,I, flZN J, flOH,I, IM NVM SSYd NltfI4 : (NI) a.~OONYJ, S qOOL :(MI) NOILDMMMOD Z%OH :ALISNZG XIMLVN :XIMLVN %tfNHMHLI~Z) ZdX~ TOOL %OO~ NOML~ZN Rep Code: 68 28284 datums Tape Subfile: 4 170 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE PLAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH BCS DIL 2435 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 13389.0 13849.0 13389.0 13849.0 13389.0 13849.0 16-0CT-91 FSYS256 REV:G002 VER:2.0 600 16-OCT-91 1430 16-OCT-91 13840.0 13846.0 13387.0 13849.0 0.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER CHT MIS TEMP PCM GR AC DIFL CHT MIS TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE PULSE CODE MODULATOR GAMMA RAY ACOUSTIC LOG DUAL IND FOCUSED LOG CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR ACOUSTIC LOG DUAL IND FOCUSED LOG 3974 3967 2806 3506 1309 1609 1503 3974 3967 2806 1309 2435 3506 1609 1503 SOREHOL~ AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 6.750 13818.0 13619.0 0000§E'0 = 5uto~ds Io^oT ~IT~ 000000'§8££I = usdag pu~ oIT~ od~i 000000'6~8£I = q~daG ~a~S aI~ ad~ 0'0 0 '89 0'0 0 '89 0 '09I 0 '89 9~ ~ S~%~ 996 (o #sax:r,) ~ ~ NN/~ I 89 gdS ~ ~ AN I 89 dS ~ ~ ~]4HO I 89 WIIM 0I ~ ~ IKI4HO I 89 GTIM 6 ~ ~ NNHO I 89 DO~M ~ ~ Id~D I 89 HO ~ ~ S~S I 89 NSS$ 9 ~ ~ S-~ I 89 DND ~ ~ T-fid I 89 ND ~ ~ SdD I 89 NSTD ~ ~ ~/S~ I 89 D~ I USbu~T ~z!s s$!ug s~Id~s ~poD ~m~N :SaAlnO PI ~ :gI qjdap $ 'NO~ffJ,flHN HGIITDNI OJ, Nf]%t SSYd NI¥I4 GNODHS 0'0 : (NI) ~4.~OGNYJ, S TOO,I, 000'0 00'0 fNO£SGN~S 000 '0 06~ 'I 000 '0 0~I 'I 8£§ '0 06E 'I 0'091 ['II 0'9~ 08'6 **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 30916 datums Tape Subfile: 5 203 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH BCS DIL 2435 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : 13352.0 13352.0 13352.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE STOP DEPTH 13879.0 13879.0 13879.0 CHT MIS TEMP PCM GR AC DIFL CHT MIS TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE PULSE CODE MODULATOR GAMMA RAY ACOUSTIC LOG DUAL IND FOCUSED LOG CABLEHEAD TENSION MASS ISOLATION SUB T EMP ERAT URE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR ACOUSTIC LOG DUAL IND FOCUSED LOG 16-OCT-91 FSYS256 REV:G002 VER:2.0 600 16-OCT-91 1430 16-OCT-91 13840.0 13846.0 13352.0 13879.0 0.0 TOOL NUMBER 3974 3967 2806 3506 1309 1609 1503 3974 3967 2806 1309 2435 3506 1609 1503 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT): 6.750 13818.0 13619.0 BOREHOLE CONDITIONS MUD TYPE: NEW DRILL MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: REPEAT PASS RUN WITH NEUTRON TOOL. $ 9.80 46.0 11.3 5.5 160.0 1.290 0.578 1.150 0.000 1.590 0.000 THERMAL SANDSTONE 0.00 0.000 0.0 ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Code Samples Units 1 AC 68 1 US/F 2 CHT 68 1 LB 3 CLSN 68 1 CPS 4 CN 68 1 PU-L 5 CNC 68 1 PU-S 6 CSSN 68 1 CPS 7 GR 68 1 GAPI 8 RFOC 68 1 OHMM 9 RILD 68 1 OHMM 10 RILM 68 1 OHMM 11 SP 68 1 MV 12 SPD 68 1 F/MN 13 TEMP 68 1 DEGF 14 TTEN 68 1 LB Size Length 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD (TYPE# O) 966 BYTES * 56 Total Data Records: 133 68.0 160.0 68.0 0.0 68.0 0.0 Tape File Start Depth = 13879.000000 Tape File End Depth = 13351.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 59980 datums Tape Subfile: 6 217 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 1 TOOL STRING NUMBER: 2 PASS NUMBER: 5 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH BCS DIL $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 13534.0 13877.0 13534.0 13877.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 16-OCT-91 FSYS256 REV:G002 VER:2.0 600 16-OCT-91 1430 16-OCT-91 13840.0 13846.0 13534.0 13877.0 0.0 TOOL NUMBER CHT MIS TEMP PCM GR AC DIFL CHT MIS TEMP GR CN PCM AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE PULSE CODE MODULATOR GAMMA RAY ACOUSTIC LOG DUAL IND FOCUSED LOG CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR ACOUSTIC LOG DUAL IND FOCUSED LOG BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): 3974 3967 2806 3506 1309 1609 1503 3974 3967 2806 1309 2435 3506 1609 1503 6.750 13818.0 13619.0 NEW DRILL 9.80 smn$~p 8019~ 89 :spoD d~ :Xa~mmns 6u!pom~p ~pom uo!$~$u~ssads~ SI% 0000§E'0 = 6u!o~ds I~AS~ ~I!~ 000000'£[~£I = u~dsG pu~ ~IT~ 000000'8£8£I = q~d~G ~S ~I!~ 0'0 0 '89 0'0 0 '89 0 '09I 0'89 I9 0~ ~ ~ A]~ I 89 ~S L ~ ~ N]4HO I 89 N%IH 9 ~ ~ RINHO I 89 G%I~ ~ ~ R54HO I 89 DOtH ~ ~ I~VD I 89 MD ~ ~ t/S~ I 89 DY q~bua% azTs sgTuR saldmes apoo amen :S~A2nD 0I :Gl q~dap 5tldVM:I M.qd HJ, dStG 3NO '~IOOi NOHifl.qN iflOHJ, IM NflM SS¥cI ,I,¥ZdZ%{ 0'0 : (NT) aaOGNV,T,S 000'0 00'0 :(NI) NOIIDZH~OD :XIMI~N %OO$ NOHI2HN 000 '0 06g 'I 000 '0 0gI 'I 8Ag '0 06E 'I 0 '09I §'G [ 'II 0'9~ Tape Subfile: 7 Minimum record length: Maximum record length: 144 records... 50 bytes 1018 bytes SNOIIIGNOD 0 '619£I 0'~IS£I 0§£ '9 : (L~) HLdZG DNISYD : (NI)ZZIS LI~ Z~OH NZdO ~WG DNIS~D GN¥ ~OHZ~O~ g0§I 609I 90§£ 60£I 908E £0SI 609I 60£I 90§[ 908~ £96£ ~£6£ DY ND ~0 SIM LHD O~ ~O SIM £HD ~ZSWi1N ~00~ (NOLA08 0£ dOi) DNI~£S 700~ 0'0 0'E~8£I 0'68£[I 0'9~8£I 0'0~8£I I6-~D0-9I 0[~I I6-~DO-9I 009 0'E:~ZA E00D:AZ~ 9§ESXS~ I6-LDO-9I 0'~§8£I 0'~§8[I 0'E§8[I 0'68££I 0'68££I 0'68£[I :(Aa) ~VA~&NI ~0~ : (~2) ~277I~ Gl :MOAIO~ NO ~2DDO~ 2Mil :G~GN~ NOI~DMID ZNI~ :NOISMZA ~M~M£MOS :G~DD07 HLdZQ dO£S HAd~G A~AS ~gOO ~OOi ~OGNZA ~ :~Z~N SS~ I :~Wi1N DNI~LS 700£ I :~Z~N~N 'sall~ s$~das uTuna pu~ '6uTa%s IOO~ 'ss~d qoma ao~ ~$~p aap~ag 6oi pu~ SaAInO £ :~WIIN ~I~ MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: 9.80 46.0 11.3 5.5 160.0 1.290 0.578 1.150 0.000 1.590 0.000 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 0.000 TOOL STANDOFF (IN) : 0.0 REMARKS: REPEAT SECTION RUN WITH NEUTRON TOOL. $ ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Code Samples Units Size Length 1 AC 68 1 US/F 4 4 2 CHT 68 1 LB 4 4 3 CLSN 68 1 CPS 4 4 4 CN 68 1 PU-L 4 4 5 CNC 68 1 PU-S 4 4 6 CSSN 68 1 CPS 4 4 7 GR 68 1 GAPI 4 4 8 RFOC 68 1 OHMS4 4 4 9 RILD 68 1 OHMM 4 4 10 RILM 68 1 OHMM 4 4 11 SP 68 1 MV 4 4 12 SPD 68 1 F/MN 4 4 13 TEMP 68 1 DEGF 4 4 14 TTEN 68 1 LB 4 4 DATA RECORD (TYPE# 0) 966 BYTES * 56 Total Data Records: 117 68.0 160.0 68.0 0.0 68.0 0.0 Tape File Start Depth = 13853.000000 Tape File End Depth = 13388.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 87896 datums Tape Subfile: 8 201 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 9 is type: LIS **** TAPE TRAILER **** 91/10/28 01 **** REEL TRAILER **** 91/10/28 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 28 OCT 91 4:48p Elapsed execution time = 49.54 seconds. SYSTEM RETURN CODE = 0