Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
191-074
THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE NOVEMBER 2, 2000 P M E E E W A T E R IA L U N D ER TH IS M ARK ER PLUGGi~iG & LOC_%T!ON CLEAP~_~CE REPORT State of Alaska 0iL & GAS CTNSERVATION COM/~ISSION >:emcr=___d__. Tc File ._e well file, amd' c-~-~m~en: on ptuqgirng, well head Well head ~: ag~: ~.. i i i · STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Plugge~l~'~k f~',~T~j.detrack WELL COMPLETION OR RECOMPLETION REPORT 1. Status of Well Classification of Service W~tif;'i;~-ii. [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 91-74 399-009 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22178 4. Location of well at surface ~,_~~~'~'--~" ' 9. Unit or Lease Name 1257' SNL, 512' EWL, SEC. 34, T11N, R13E, UM ~ ~~ ~ Prudhoe Bay Unit Attop of productive interval ~L~ 10. Well Number 2693' SNL, 2241' EWL, SEC. 34, T11 N, R13E, UM Y-34 At total depth 11. Field and Pool 2829' SNL, 2309' EWL, SEC. 34, T11N, R13E, UM Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 86.97'I ADL 028287 12. Date Spuddedc/1/91 I 13' Date T' D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °ffsh°re 16' N°' °f C°mpleti°nsC/13/91 2/22/99 N/A MSL Zero 17. Total Depth (MD+TVD) J18. Plug Back Depth (MD+TVD)J19. Directional Survey j20. Depth where SSSV set J21. Thickness of Permafrost 9841 9213 FTJ 9755 9139 FTJ []Yes [~NoJ (Nipple) 2096' MDJ 1900' (Approx.) 22. Type Electric or Other Logs Run DIL/BHC/GR / SP/CNL 23. CASlN% LINER AND CEMENTING RECORD CASING SE-Iq-lNG DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO-FI-OM SIZE CEMENTING RECORD AMOUNT PULLED 20" Insulated Conductor Surface 110' 10-3/4" 45# L-80 Surface 2685' 13-1/2" 2924 cu ft Coldset III & II 9-7/8" 29.7# L-80 Surface 9417' 9-7/8" 1328 cu ft Class 'G' 5-1/2" 17# NT13/Cr80 9149' 9841' 6-3/4" 176 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, 13Cr 9151' 9092' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9462' Set Top of Whipstock 9465' P&A w/26 Bbls Class 'G', Sqzd 1500 psi 27. PRODUCTION TEST INAL Date First ProductiOnNot on Production IMeth°d °f Operati°n (Fl°wing' gas lift' etc')N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL iCHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9420' 8848' Shublik 'A' 9448' 8873' Zone 4 9541' 8954' 31. List of Attachments Summary of Daily Drilling Reports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble '~~~ ~ Title TechnicalAssistantlll Date ~" //---'/' ¢¢ Y-34 91-74 399-009 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 PRUDHOE BAY, ALASKA TO: P.E. REPORT GROUP FROM: ROMBERG / REA Well Name: Y-34 Main Category: CTSDTK Sub Category: TBG, INTG, TEST. OPERATION DATE 11/08/98 Date: 111/09/98 OPERATION: TUBING INTEGRITY TEST, R/U LOOP BLEED IA AND SHOOT F/L'S ON IA. INITIAL PRESSURES: SIWHP=2400 psig, IAP=2440 psig, OAP=170 psig Time SIP lAP OAP IA F/L Comments: 1030 2400 2440 170 8584 START BLEEDING IA. 1110 2240 500 170 8607 STOP BLEEDING, START 4 HR TEST 1510 2300 540 170 8554 FINAL F/L. R/D FINAL PRESSURES: SIWHP=2300psig, lAP=540 psig, OA=170 psig CONCLUSION · Y-34 PASSED TBG INT TEST PRUDHOE BAY, ALASKA TO: ANCHORAGE PE'S FROM: LIDDELOW Well Name: Y-34 Main Category: WIRELINE Sub Category: CTSDTRK F51 Operation Date: 11/11/98 Date: I11/11/98 Y-34 / DUMMY WHIPSTOCK HES Cf 2 SIP=2,150Cf lAP=680# OAP=180Cf WHT=S/I RIH W/20' X 3.625 DUMMY WHIPSTOCK,TAG HARD BOTTOM @ 9,614' WLM. SUMMARY DRIFTED W/DUMMY WHIPSTOCK,TAG HARD BOTTOM @ 9,614' NOTIFIED PAD OP. OF WELL STATUS PRE JOB SAFETY MEETING: SUBSIDENCE WELL TD Wireline Depth: N/A TD Corrected Depth: N/A Diesel Used INONE I Methanol Used INONE CTSDTRK F51 WHP=S/I PAD ENG R & PBU REPORTS ii.....!i!.....::...i!.i.:..:..~E~:iNUMBER:: 4P1259 KRIEGER 9335-040-420 ~iii!!iiSET A 5-1/2", 17# BAKER WHIPSTOCK AT 9462', THE FIRST WHIPSTOCK SET IN THIS WELL FELL TO BOTTOM. i!iii?MIaU SWS & BAKER; CALIBRATE POS; RIH; TIE-IN; SET WHIPSTOCK AT 9462', TRAY FACE 13.9° RIGHT OF HS; LOG OFF SHOT DEPTH; TAG WHIPSTOCK AT POOH; TOOL STUCK IN TAILPIPE; TRY TO WORK FREE; DECIDE TO PULL SUCCESSFULLY SET WHIPSTOCK #2 AT 9462', TRAY FACE IS 13.9° RIGHT OF FISH: THE WHIPSTOCK SE~ING TOOL STRING IS STUCK IN THE TAILPIPE AROUND 9145'. THE FISH CONSISTS OF SWS HEAD, SWIVEL, POS, G R/CCL, FIRING HEAD, BAKER SE~ING TOOL W/ROD. TOTAL LENGTH 23', MAX OD 3- ~?.?:~:~?~::~:~!~~~:;~N~i~:.~IWHP = O PSI, lAP = 500 PSI, OAP = 200 PSI 0O3O 0240 0250 0310 0315 0320 0330 O4OO 0415 0530 0630 JOB LOG: 2200 MIRU SWS #2150, B. BOEHME; BAKER OIL TOOLS - S. WILSON. 2330 PJSM. APPOINT J. BAMBERG SPILL PREVENTION CHAMPION. 2340 CALL FOR RADIO SILENCE. 2350 CALIBRATE POS, ARM WHIPSTOCK, INSERT RA PIP TAG. 02/21/99 0000 PU TOOLS, LOGGING POS, GR/CCL, FIRING HEAD, BAKER SETTING TOOL, WHIPSTOCK (3.625" OD). TOTAL L. = 35', TOTAL WT 750#, CCL TO TOP WPSTK = 9.5', CCL TO BTM = 21.5'. RIH, MAX SPEED 100 FPM. NO PROBLEMS @ TAILPIPE. TIE-IN TO CET 7-25-91. TRAY ROLLING OUT OF _+ 30° SETTING WINDOW WHEN PU TOOL. WORK TOOL UP/DN HOLE TO POSITION TRAY FACE WITHIN SETTING WINDOW. DID NOT GO BELOW 9500'-AFRAID OF PICKING UP CMT DEBRIS FROM SQZ PERFS. PULL UP TO FIRING DEPTH, CCL @9452', TOP OF WHIPSTOCK @ 9462'. TRAY FACE 13.9° RIGHT OF HS. RELEASE PACK OFF, TENSION 2850#, SET WHIPSTOCK, TENSION DROPPED TO 2230#. WAIT 3 MIN TO ENSURE FULLY SET. LOG OFF WHIPSTOCK. LOG DN, TAG TOP OF WHIPSTOCK AT SETTING DEPTH. POOH. PULL INTO TAILPIPE @ 10K FT/HR, PULLED 2K OVER, TOOL STUCK. RECIPROCATE CABLE TO WORK TOOL FREE, UNSUCCESSFUL. UNABLE TO FREE TOOLS, DECIDE TO PULL OUT OF WEAK POINT. POOH. OOH. RELEASE RADIO SILENCE. RDMO SWS. CALL OUT HFS TO FISH STUCK TOOLSTRING. FINAL WELL CONDITIONS: SIWHP = O PSI, lAP = 500 PSI, OAP = 200 PSI TOTAL FLUIDS PUMPED: NONE TOTAL DEPTH (E-line): NO TAG PRUDHOE BAY, ALASKA TO: FROM: Well Name: Main Category: Sub Category: Operation Date: ANCHORAGE PE'S B. Rochin/R. Lid de Iow IY-34, F- 12 WlRELINE 4P1259 NRWO FS0 Date: 12-21-99 I Y-34 RES SURV HES # 2 SIP= 0 lAP= 480 OAP= 150 WHT= S/I WHP= S/I R/U,RIH W/4 ~,,~ "GS TO E-LINE FISH @ 9578' WLM,POOH W/FISH, RDMO. LEFT WELL SHUT IN! TD Wireline Depth: N/A SUMMARY: FISHED OUT SCHLUMBERGER TOOLS TD Corrected Depth: N/A Diesel Used INONE Methanol Used INONE I F-12 N RWO F50 HES # 2 SIP=2300 lAP= 550 OAP= 400 WHT= 110 R/U,RIH W/7" GS TO BVN @ 2004' WLM.POOH W/7" INSERT. RIH W/5 ~ GS W/DUMMY PATCH TO 6000' WLM, NO PROBLEMS,POOH LDFN WHP= 450 RELEASED WELL @ 1900 HRS. TD Wireline Depth: N/A TD Corrected Depth' N/A Diesel Used INONE SUMMARY: PULLED INSERT AND DRIFTED W/5.85" DUMMY PATCH. Methanol Used INONE PRUDHOE BAY, ALASKA TO: ANCHORAGE PE'S FROM: Rochin/Liddelow Well Name: IY-34 Main Category: IWlRELINE Sub Category: 14P1259 Operation Date: 102/20/99 Date: 12-22-99 I Y-34 4P 1259 HES # 1 SIP= 0 lAP= 480 OAP= 150 WHT= S/I WHP= S/I R/U,RIH W/8' 2 1/8 STEM,4.5" GR W/OVERSHOT TO FISH @ 9408' WLM,COULDN'T LATCH POOH.BOTTOM OF OVERSHOT HAD CUTS ON IT INDICATING THAT IT WASN'T GETTING OVER FISH.RIH W/KNUCKLE ON GR TO FISH,LATCHED UP AND HIT 10 LICKS AND SHEARED GR POOH.RIH W/4.5" GS TO FISH @ 9408' POOH W/FISH. RDMO. LEFT WELL SHUT IN! TD Wireline Depth: N/A SUMMARY: FISHED OUT SCHLUMBERGER TOOLS TD Corrected Depth: N/A Diesel Used INONE Methanol Used INONE Y-34 DESCRIPTION OF WORK COMPLETED PRE-SIDETRACK CEMENT PLUG 02/22/99 A Cement Plugback was performed on the interval using the following fluids: SUMMARY Moved in rig up Camco CT and squeeze unit. Rig in hole w/tapered cement nozzle while pumping down coil and annulus to cool down wellbore. Tag whipstock and stack ,-,1,500#- held fine. Pull up 10' and start mixing cement. Pump cement (2 bbl neat + 8 bbl aggregate + 15 bbl neat) with 5 bbl fresh water spacers ahead and behind. Displace with KCI, lay in cement and pull to safe depth. Hesitate squeeze. (Able to get plug to pressure up to 1,500 psi quite easily but would not hold pressure.) Got plug to hold pressure and rig in hole pumping Biozan to contaminate. Sat down hard at 9,145' (CTMD). Tried for one hour to get past obstruction - no luck. Pulled out of hole leaving TOC at 9,145'. Freeze protect coil and top 250' of well. RDMO Camco. Fluids Pumped BBLS. Description 307 Fresh water w/2% KCL & friction reducer 52+ 255 10 Freshwater 42 Methanol 25 Cement 30 Biozan 270 Fresh water w/2% KCL 684 Total Well: Y-34A Accept: 02/23/99 Field: Prudhoe Bay Spud: 02/25/99 APl: 50-029-22178-01 Re leas e: 03/06/99 Permit: 99-04 CTD Unit: Nordic #1 Date Day Depth 02/24/99 I 9210 Move Nordic 1 CTD rig from K pad, Derrick down rig move. Raise derrick and wind walls. Position rig over well. Accept Rig at 12:30 Hrs, 02/23/99. N/U BOP stack, Pick up injector head, M/U guide arch and stab CT. Fill pits with SW. Test BOPE. Fill CT with SW. Install Baker CTC. PT @ 3500 psi, 35K. MU milling BHA. RIH with BHA #1 (3.80" dimple mill and flex jt). Mill thru XN at 9145'. Drill medium firm cement from 9157'. 02/25/99 2 9479 Drill firm cement in the 5 ~" liner from 9210 - 9465 ft. Tagged whipstock on depth and milled window with 3.80" dimple mill from 9465 - 9471 ft. POOH. RIH with 3.69" formation mill and 3.80" string reamer. Dress window to 3.80" with string reamer and drill 5' of open hole to 9176'. POOH for drilling assembly. LD milling assy. MU drilling BHA. RIH with BHA #3 (M09X bit, 1.75 deg motor). Correct depth to flag. RIH thru window. Orient to drill. Drill ahead building angle from 9176' while displacing seawater to FIo Pro mud. 02/26/99 3 9598 Drill build section in Shublik from 9479 - 9518 ft. Several stalls and Iow ROP. Pull to change motor. RIH with 1.6 deg motor and Bit #1RR. Continue drilling build section in Shublik from 9518 - 9598' and had numerous stalls and very slow ROP. Entered Zone 4 at 9557' and ROP was still slow with numerous stalls. POOH to check bit/motor. O2/27/99 4 I O234 At surface, change out motor and bit. Download Sperry Vibration tool data. Pressure test BHA - no leaks. RIH with BHA # 5, with 1.7 deg motor and DS49HGJU bit #2RR. Tag TD and correct depth. Orient TF and drill build section from 9598 - 9795 ft. Landed well at 8964 ft TVDSS at 9795 ft CTD. POOH and tie-in with GR at RA tag at 9471 ft. [added 5 ft to CTD], present TD is 9800 ft. Flagged CT at 9515 ft bit depth. POOH. Download Sperry vibration tool data. Change out motor, bit and orientor. RIH with BHA #6, [1.0 deg motor, Bit #3 ]. Correct to flag (-23'). Precautionary ream to TD. Drill at 92 deg from 9800-9927'. Short trip to window. Drill at 92 deg from 9927-10049'. Shale bumped angle at bit to 99 deg. Short trip to window. Orient to drop angle. Drill from 10049-10152' and get back to 94 deg. High point caused stacking problems. Short trip to window. Drill at 94 deg from 10152-234' (8938' TVD). O2/28/99 5 11221 Drilled horizontal hole (92 deg) from 10234 - 10263 ft. Short tripped to window. RIH and drilled horizontal hole from 10263 - 10500 ft. Swapped to new FIoPro mud system. Short trip to window. Hole in good condition. Tied-in with GR at RA tag, Added 7 ft to CTD. RIH and drilled horizontal hole from 10500 - 10750 ft (8916' TVD). Short trip to window. Hole is clean. Drilled horizontal hole from 10750-10934' and lost some angle (8926'). Short trip to window. Tie-in, no correction. Drill ahead building angle from 10934-11086' (8916' TVD).). Short trip to window. Drill from 11086' maintaining 92 deg. Hit a hard spot at 11212' (8903' TVD) and began losing 0.5 BPM. Drill to 11221' and lost all returns. Backream to window prior to POOH for cementing BHA. ~--" STATE OF ALASKA .----. ALASI% . OIL AND GAS CONSERVATION COM,. ~SION APPLICATION FOR SUNDRY APPROVAL Plug back for CT sidetrack 1 Type of Reauest'[] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate · ~ ' [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1257' SNL, 512' EWL, SEC. 34, T11 N, R13E At top of productive interval 2693' SNL, 2241' EWL, SEC. 34, T11 N, R13E At effective depth 2790' SNL, 2994' EWL, SEC. 34, T11 N, R13E At total depth 2829' SNL, 2309' EWL, SEC. 34, T11 N, R13E Type of well: Development [] Service Exploratory Stratigraphic 6. Datum Elevation (DF or KB) KBE--86.97 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number Y-34 9. Permit Number 91-74 10. APl Number 50- 029-22178 11. Field and Pool Prudhoe Bay Field / Prudhoe Ba~/ Pool 12. Present well condition summary Total depth: measured 9841 feet true vertical 9213 feet Effective depth: measured 9755 feet true vertical 9139 feet Casing Length Size Structural Conductor 110 20x30 Surface 2649 10 3/4 Intermediate 9381 9 7/8 Production Liner 692 5 1/2 Plugs (measured) Junk (measured) Cemented 2924 c.f. Coldset III&Il 1328 c.f. Class G 176 c.f. Class G OR16 MD NAL TVD 146 146 2685 2685 9417 8846 9149-9841 8613-9213 Perforation depth: measured 9539'-9606',9616'-9637',9647'-9676' true vertical subsea8865'-8924',8933'-8951 ',8959'-8984' Tubing (size, grade, and measured depth) 4 1/2" 12.6# NT13CR80 @9151' Packers and SSSV (type and measured depth) 13. Attachments [~ Description summary of proposal [] Detailed operations program [] BOP sketch 14. Estimated date for commencing operation 1/25/99 16. If proposal was verbally approved 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Name of approver Date approved Contact Engineer Name/Number: Ted Stagg 564-4694 Prepared By Name/Number: Theresa Mills 564-5894 17. I hereby certify that the foregoi,ng is true and correct to the best of my knowledge Signed _ -red Staqq ~//'~"~,¢~ Title Coiled Tubinq Drilling Engineer ¢~c~o9-~ ¢(/ Commission Use Only C9,,Rd'~.c,r~f Apprpval: '.c'? ' .¥,~?' -~' Notify Commission so representative may witness Plug integrity ~ BOP Test ~" Location clearance__ Mechanical Integrity Test __ Subsequent form required 10- ~ 0'1' Approved by order of the Commission Form 10-403 Rev. 06/15/88 Date I Approval No,.~- ~? ORIGINAL SIGNED' BY Robert N. Ohfisten-~on Commissioner Date )/C~(~)(~ ~ Submitln -Itriplicate BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Date: Jan. 12, 1999 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Blair Wondzell Sr. Reservoir Engineer Re: Well Y-34 Prep for CT Sidetrack Well Y-34 is scheduled for a through tubing sidetrack to be drilled with coiled tubing. The following summarizes the procedure required to prepare Y-34 for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack completion is attached. 1. A tubing integrity test will be performed. 2. Tubing and liner will be drifted with a 3.625" OD drift. 3. A mechanical whipstock will be set in the 5 1/2" liner at approx. 9475', or 49 ft below the top perforation. 4. Service coil will be used to downsqueeze approx. 25 bbls cement past the whipstock to abandon existing perfs. A squeeze pressure of 1500 psi will be achieved and witnessed by AOGCC prior to washing out cement above the whipstock. 5. The window will be milled with either service coil or drilling coil. A flowline will be used for returns if the milling is done with a service coil. Form 10-401 will be obtained prior to milling. Ted Stagg CT Drilling Engineer cc: Well File Petrotechnical Data Center TREE: 4 1/16"- 5M CIW WELLHEAD: 11" - 5M FMC (-34a Proposed Completion KB. ELEV = 86.97' BF. ELEV: 50.64' CMT'd-- 10 3/4", 45.5#/ft, I NT-80 BTRS 2685 KOP: 4500' MAX ANGLE: 33° @ 5900' SSSV LANDING NIPPLE J 2096'I GAS LIFT MANDRELS 3006' 2919' 5381' 5264' 7235' 6862' 8238' 7732' 8843' 8261' 9059' 8448' 4 1/2", 12.6#/ft, 13CR, TDS CHROME TUBING TUBING ID: 3.958" CAPACITY: 0.0152 BBL/FT CHROME LINER AND TUBING' TOP OF TIW I 5 1/2" LINERI 9149' 7 5/8", 29.7#/ft, 4 1/2 .... SWS" NIPPLE (PARKER) (3.813" ID) 9087' Right-hand release latch 9091' 7 5/8" TIW PACKER (HE-BP) (4.00" ID) I 9092'1 4 1/2", 12.6#/ft, 13Cr TAILPIPE 4 1/2 .... SWS" NIPPLE 9117' (PARKER) (3.813" ID) 41/2 ....SWN" NIPPLE 9139' ELMD 9145' 4 1/2" 9151 2 7/8" Liner wi cement approx. 200 ft above the window. Top of Whipstock approx. 9465' PERFORATION SUMMARY REF LOG' ATLAS - BHCA 6-13-91 TIE-IN LOG: SWS - CBT 7-25-91 SIZE SPF INTERVAL (:IPEN/SQZ'D 3 3/8" 6 9426 - 9446 OPEN 8/27/94 3 3/8" 6 9540 - 9580 OPEN 3/3/92 3 3/8' 6 9539 - 9556 SQZD 2/26/92 3 3/8' 6 9556 - 9606 SQZD 2/26/92 3 3/8' 6 9616 - 9637 SQZD 2/26/92 3 3/8' 6 9647 - 9676 SQZD 2/26/92 PBTDI 9846' 5 1/2", 17 #/ft, 13Cr, FL4S I 9841' .0232 BBL/FT I STATE OF ALASKA ..... AL, ._KA OIL AND GAS CONSERVATION COMMIS N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate__ Plugging__ Pull tubing __ Alter casing Repair well Perforate X Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1257' SNL, 512' EWL, SEC. 34, T11N, R13E At top of productive interval 2693' SNL, 2241' EWL, SEC. 34, T11N, R13E At effective depth 2790' SNL, 2994' EWL, SEC. 34, T11N, R13E At total depth 2829' SNL, 2309' EWL, SEC. 34, T11N, R13E 5. Type of Well: Development X Exploratory Stratigraphic Service __ 6. Datum elevation (DF or KB) KBE=86.97 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-34(23-34-11-13) 9. Permit number/approval number 91-74 / 10. APl number 50- 029-22178 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2649 Intermediate 9381 Production -- Liner 692 Perforation depth: measured 9841 feet Plugs (measured) 9213 feet 9755 feet Junk (measured) 9139 feet Size Cemented 20 10 3/4 2924 c.f. Coldset III&Il 9 7/8 1328 c.f. Class G 5 1/2 176 c.f. Class G 9539'-9606', 9616'-963 7', 964 7'-9676' Measured depth True verticaldepth BKB 146 146 2685 2685 9417 8846 9149-9841 8613-9213 true vertical subsea8865'-8924',8933'-8951',8959'-8984' Tubing (size, grade, and measured depth) 4 1/2" 12.6#NT13CRSO @9151' Packers and SSSV (type and measured depth) Packer@9092' and SSSV @2096' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure AUG 30 199.5 .Oil .& Gas Cons. Commission : ~uhu~ge 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 504 436 652 1500 421 458 361 1540 Tubing Pressure 332 335 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby ce,rtify that the forcCdf'h"g is t~rue,and correct to the best of my knowledge. Signed J Title Senior Technical Assistant II Form 10-404 Rev06/15/8~ /' D at e (r~./,,.~¢/¢.~,'- j SUBMIT IN D~PLI,~ATE WELL Y-34(23-34-11-13) Addperf Operation 08/27/94 The following additional interval were perforated using 3 3/8" guns, 6SPF and 60° phasing. 9426' - 9446' MD SAG PERFS STATE OF ALASKA ALA,. , OIL AND GAS CONSERVATION COMMISS, REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing __ Alter casing __ Repair well __ Perforate__ .-'*.- Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1257' SNL, 512' EWL, SEC. 34, T11N, R13E At top of productive interval 2693' SNL, 2241' EWL, SEC. 34, T11N, R13E At effective depth 2790' SNL, 2994' EWL, SEC. 34, T11N, R13E At total depth 2829' SNL, 2309' EWL, SEC. 34, T11N, R13E 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) -~' ~ KBE=86.97 fee~t 7. Unit or Property name Prudhoe Bay Unit 8. Well number Y-34(23-34-11-13) 9. Permit number/approval number 91-74 / 10. APl number 50- 029-22178 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2649 Intermediate 9381 Production -- Liner 692 Perforation depth: measured 9841 feet Plugs (measured) 9213 feet 9755 feet Junk (measured) 9139 feet Size Cemented 20 10 3/4 2924 c.f. Coldset III&Il 9 7/8 1328 c.f. Class G 5 1/2 176 c.f. C/ass G 9539'-9606', 9616'-9637', 9647'-9676' Measured depth 146 2685 9417 9149-9841 True verticaldepth BKB 146 2685 8846 8613-9213 true vertical subsea8865'-8924',8933'-8951',8959:8984' Tubing (size, grade, and measured depth) 4 1/2" 12.6#NT13CR80 @9151' Packers and SSSV (type and measured depth) Packer@9092' and SSSV @2096' RECE V' OCT- 7 t99;_'~ 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure ,&laska 0il & 6as Cons. 0omrn~s Anchorage 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 410 -933 165 2710 1380-- ''~'' 24 1034 2920 247 369 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 17. I hereby certify that the foregoing Form 10-4-'~"~ Rev 06/1~;/~8' / I16. Status of well classification as: [I Oil X Gas Suspended is true and coirect to the best of my knowledge. Title Senior Technical Assistant I Service Date /~2z/¢'/~2/2 J SUBMIT IN DLHSLt/CATE 2/25/92 3/01/92 WELL Y-34(23-34-11-13) NRWO/FRAC A NRWO WSO was performed using the following fluids: 230 BBLS PW TO LOAD WELL 240 BBLS PW CIRC 5 BBLS EW 30 BBLS ACID 15 BBLS MUD ACID 15 BBLS 3% AMM. CHLORIDE H20 233 BBLS PW 6 BBLS EW (PREFLUSH) 15 BBLS CEMENT 24 BBLS EW (SPACER) 22 BBLS DUO POLYMER (CONTAMINANT) 12 BBLS PW (DISPLACEMENT) 307 BBLS PW(REVERSE OUT) S 1 BBLS PW (JET PASS) 41 BBLS PW (FINAL REVERSE OUT) 4S BBLS RECOVERED(N2 DISPLACEMENT) 36 BBLS MEOH(FREEZE PORTECTION CT) WELL CLEANED OUT TO 9702' 418 BBLS LOAD FLUID BEHIND PIPE TODAY 1 Z BBLS CEMENT RECOVERED ACID lZ% HC/W/Z0% XY/ENE, 1% WS-36, .4% HAl-85, 57# FERCHEK-A MUD ACID 1Z%HCL W/3% HF, 15%AF,.OOS%HAI-85,.OOZ%LS-;~51,30# FERCHEK-A CEMENT 15.5 PPG CLASS "G" CMT CONTAINING, .2% CFR-3, .33% HR-12, .15 GAL/SK HALAD-344L SQZ #1 A NRWO WSO was performed using the following fluids: 155 BBLS PW TO LOAD WELL 5 BBLS EW(PREFLUSH) 10 BBLS CEMENT 26 BBLS EW(SPACER) 16 BBLS DUO POLYMER(CONTAMINANT) 17 BBLS PW (DISPLACEMENT) 315 BBLS PW (REVERSE OUT) 99 BBLS PW (JET PASS) 35 BBLS PW (FINAL REVERSE OUT) 35 BBLS MEOH(FREEZE PROTECTION CT) 35 BBLS MEOH(FREEZE PROTECTION WELL) WELL CLEANED OUT TO 9700' 1 BBLS LOAD FLUID BEHIND PIPE TODAY(APPROX TOTAL 420) 9 BBLS CEMENT RECOVERED(DOES NOT INCLUDE CEMENT NOT PUMPED) CEMENT 15.5 PPG CLASS "G" CMT CONTAINING, ..2% CFR-3, .35% HR-1 Z, .1 45 GAL/SK HALAD-344L SQZ #2 ECE VED oo'1' - 7 199 Alaska 0il & Gas Cons. 6ommissio~ Anchorage PAGE 2 3/03/92 3/07/92 fjh 7/19/93 WELL Y-34(23-34-11-13) The following interval were reperforated using 3 3/8" random orientation and 60° phasing. 9540'- 9580' MD guns, 6 SPF, Performed a Hydraulic(IVI) Fracture Treatment using the following fluids: 30 BBLS 50# GEL PREPAD TO ESTABLISH RATE 202 BBLS PAD W/323 GAL ESL(3.8%) 42 DIRTY i PPG 13 DIRTY 2 PPG 19 DIRTY 3 PPG 25 DIRTY 4 PPG 29 DIRTY 5 PPG 33 DIRTY 6 PPG 36 DIRTY 7 PPG 39 DIRTY 8 PPG 41 DIRTY 9 PPG 248 DIRTY 10 PPG 142 50#-20# GEL FLUSH 220 BBLS DISEL TO SET TREE SAVER, PRIME PUMPS, FRZ PROT. OCT-- 7 1993 ,Alaska Oil & Gas Cons. Anchorage ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 2 September 1994 RE: ., Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 PDK/GR/CCL FINAL BL 1 PDK/GR/CCL RF SEPIA 1 PL/PROFILE FINAL BL 1 PL/PROFILE RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA ECC No. Run # 1 4811.01 Run # 1 Run # 1 4986.03 Run # 1 Run # 1 Run # 1 5607.08 Run # 1 6002.01 Run # 1 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 ~,~ ,~ Anchorages, AK 99518 ~ Att~/R~ney D Paulson Received Date: ¢ P1 i~ ~d return to: Petrotec~ical Data Center BP Exploration (Alaska) Inc 900 East Benson Boulevard ~chorage, ~aska 99508 Received by Date ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 31 August 1994 RE: ~ Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: Y-29 (23-04-10-13) 1 PFC/PERF FINAL BL l PFC/PERF RF SEPIA Y-33 (32-28-11-13) PFC/PERF FINAL BL 1 GR/CCL RF SEPIA 1 RF SEPIA ECC No. Run # 1 1215.01 Run # 1 Run # 1 4772.02 Run # 1 Run # 1 Run # 1 4844.01 Run # 1 4986.02 Run # 1 Run # 1 Run # 1 5157.03 Run # 1 5167.01 Run # 1 Please sign and retur~t :~~A/la~ Wi~n, Received b~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 06/19/92 T# 83612 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-25~z'~¢ PROD-F 05/24/92 #1 a-12~'--I/~ STATIC 05/21/92 #1 A-21~-'~ GAS LIFT SURVEY 05/24/92 ~1 S-14~'~A~ INJ 05/14/92 #1 D-17 ~-I~,~ GAS LIFT SURVEY 06/01/92 #1 S-09oO~''t°~ INJ 05/26/92 #1 M-21-----'~ -] $, PROD-F 06/01/92 %1 P-15q--f~ GAS LIFT SURVEY 05/28/92 #1 x-12~-~. GAS LIFT SURVEY 06/02/92 #1 R-05 ~'~f INJ 06/06/92 #1 R-27 $~'$! CCL/PERF 06/13/92 #1 Y-34~[°~. GAS LIFT SURVEY 05/13/92 #1 A-27~)~ MISC GAS INJ 05/20/92 #1 S-09 ~-~"~ INJ 05/14/92 %1 B-17 ~,.~ GAS ENTRY SURVEY 5 " D-21~Z,'~ZGAS ENTRY SURVEY 5 " Z-01 ~-~ GAS ENTRY SURVEY 5 " C-01 ~2.~ GAS ENTRY SURVEY 5 " 12350.00-12525.00 CAMCO 5 " 8790.00- 9290.00 CAMCO 5 " 3000.00-12700.00 CAMCO 2/5" 10250.00-10800.00 CAMCO 5 " 100.00-10376.00 CAMCO 2 " 9840 00-10253.00 CAMCO 5 " 100 0 2400 8890 8650 100 8300 9850 05/28/92 #1 00- 9110.00 CAMCO 2/5" 00-12300 00 CAMCO 2/5" 00- 8500 00- 9165 00- 9553 00- 9678 00- 9116 00-10200 10750 00 CAMCO 2 " 00 SCH 5 " 00 ATLAS 5 " 00 CAMCO 2 " 00 CAMCO 5 " 00 CAMCO 5 " 00-11080.00 CAMCO 05/26/92 #1 9900.00-11220.00 CAMCO 05/13/92 #1 10400.00-10782.00 CAMCO 05/15/92 #1 7200.00- 9070.00 CAMCO Information Control Well Records Adrian J. Martin / ECEIVED JUN 2 6 1992 Alaska 0il & ~as Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 // DATE: 04/03/92 T# 83365 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-25 ~2'"" ~; ~;/P ROD-F 03/06/92 Y-34 ?,: TEMP 03/06/92 M-16~/--~ GR 12/18/91 ~-10~/--~~ LEAK DET 03/07/92 R-15~3--3/ GAS LIFT SURVEY 03/07/92 H-16~/-W~ GAS LIFT SURVEY 03/11/92 X-02 ~~ PROD-F 03/06/92 F-37~--~_LEAK DET 03/12/92 Y-14~-FFGAS LIFT SURVEY 03/15/92 U-05~'/~ INJ 03/14/92 X-10~--~GAS LIFT SURVEY 03/11/92 W-10 SJ-/F~ TUBING INTEGRITY TEST 5 " 12350.00-12650.00 CAMCO 5 " 9000.00- 9575.00 CAMCO 5 " 10000.00-10996.00 CAMCO 5 " 500.00- 1980.00 CAMCO 5 " 609.00- 9295.00 CAMCO 2/5" 2850.00- 8700.00 CAMCO 2/5" 9550,00- 9927.00 CAMCO 5 " 0.00-10300.00 CAMCO 2 " 0.00- 9600.00 CAMCO 2 " 9050.00- 9400.00 CAMCO 5 " 2850.00- 9900.00 CAMCO 2/5" 03/04/92 #1 13600.00-13886.00 CAMCO Information Control Well Records Adrian J. Martin REC IV -D APR 5 1997- A~aska 0i~ & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 Eas! Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/03/92 T# 83153 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ./--%-26 ~-5~ LEA/{ DET 11/07/91 #1 /212~0--/17 GAS LIFT SURVEY 11/16/91 #1 PROD-F TEMP ~-01 ~Z'3~ LEAK DET ~5 ~'~ INJ /-G'lt ~/_~o LEAK DET ~LIFT SURVEY ~08 ~-Z~ '~OD-~ ~13 q~'io; LEAK DET ~3 ql-)o TEHP ~3 ~ LE~ DET ~~ LE~K DET PROD-~ 11/17/91 #1 11/14/91 #1 11/07/91 #1 11/20/91 #1 11/20/91 #1 11/23/91 #1 11/21/91 #1 11/16/91 #1 11/13/91 #1 11/17/91 #1 12/10/91 #1 12/14/91 #1 12/10/91 #1 12/15/91 #1 12/12/91 #1 11/17/91 #1 216.00-11697.00 CAMCO 2 " 150.00- 9311.00 CAMCO 2/5" 10200.00-10378.00 CAMCO 5 " 8700.00-10119.00 CAMCO 5 " 2000.00- 7600.00 CAMCO 5 " 9400.00- 9940.00 CAMCO 5 " 11200.00-11430.00 CAMCO 5 " 9350.00- 9816.00 CAMCO 5 " 2900.00-10210.00 CAMCO 5 " 150.00-12776.00 CAMCO 2 " 9050.00- 9430.00 CAMCO 5 " 10150.00-11400.00 CAMCO 5 " 10500.00-11345.00 CAMCO 5 " 400.00-10446.00 CAMCO 2 " 8900.00- 9708.00 CAMCO 5 " 200.00-10800.00 CAMCO 2/5" 9400.00- 9780.00 CAMCO 5 " 10150.00-11400.00 CAMCO 12/11/91 #1 13575.00-14590.00 CAMCO Information Control Well Records Adrian J. Martin RECEIVED JAN 2 2 1992 Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 01/03/92 T# 83152 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. / 9"--I M-26 / // / GAS LIFT SURVEY ~%-I~I F-~2~-~ 5 PROD-F ~'~ B-13/~ INJ mm [ INJ - ~ ~~/J GAS LIFT SURVEY ~l-I;~X-18 ~, PROD-F ~-~6 Z-32 ~// TEMP [~-~ ~-~J ~ CL ~i~e S-03 V~ TEMP P ROD-F GAS LIFT SURVEY 11/24/91 #1 GAS LIFT SURVEY 11/24/91 #1 GAS ENTRY 5 " GAS ENTRY ~¢3J-02 GAS ENTRY 5 " 12/08/91 #1 12/07/91 #1 12/07/91 #1 12/09/91 #1 12/04/91 #1 12/08/91 #1 12/06/91 #1 12/07/91 #1 12/09/91 #1 12/08/91 #1 11/08/91 #1 11/05/91 #1 11/09/91 #1 11/06/91 #1 12/06/91 #1 11/21/91 #1 Information Control Well Records Adrian J. Martin 2000.00-11539.00 CAMCO 2/5" 9450.00- 9710.00 CAMCO 5 " 9150.00- 9520.00 CAMCO 5 " 10586.00-10935.00 CAMCO 5 " 9800.00-10080.00 CAMCO 5 " 8758.00-10259.00 CAMCO 5 " 9350.00- 9850.00 CAMCO 5 " 100.00- 9130.00 CAMCO 2 " 10500.00-10867.00 CAMCO 5 " 12850.00-13445.00 CAMCO 5 " 10000.00-11010.00 CAMCO 5 " 9900.00-11038.00 CAMCO 5 " 12000.00-12337.00 CAMCO 5 " 9750.00-11270.00 CAMCO 5 " 11095.00-12076.00 CAMCO 5 " 5300.00-11200.00 CAMCO 5 " 0.00- 2840.00 CAMCO 2/5" 0.00- 9860.00 CAMCO 2 " 12/08/91 #1 9950.00-10240.00 CAMCO 12/05/91 #1 12/05/91 #1 11100.00-11450.00 CAMCO 9850.00-10200.00 CAMCO RECEIVED JAN 0 8 1992 Alaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO Date :06/17/91 CH EVRON T#:82518 EXXON MOBIL PHILLIPS TEXACO STATE OF ALASKA GEOSCIENCE ARCHIVES BP OPEN HOLE FINAl., Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Y-34 BHCA 06/13/91 #1 9415-981 6 Atlas 2"/5" Y-34 CN/GR 06/13/91 #1 7950-9 788 Atlas 2"/5" Y-34 DIFL 06/13/91 #1 9415-9843 Atlas 2"/5" *** GEOS/ARCO/EXXON/ARCHIVES ONLY. Y-34 SS TVD 06/13/91 #1 9415-9843 Atlas 1 "/2" STATE ONLY: Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Date: Inforation Control Well Records LR 2-1 J. Dietz/S. McCurry Job~: Job/l: SEp i 8 ]991 Oil & Gas Cons *ZuTchora~7e' _ STATE OF ALASKA - ALASKA OIL AND GAS CONSERVATION coMMISSION 0 R I G WELL COMPLETION OR RECOMPLETION REPORT AND LOG t. Status of Well Classification of Service Well OIL [] GAS [] ~ED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 91-74 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22178 4. Location of well at surface 9. Unit or Lease Name 1257' SNL, 512' EWL, SEC. 34, T11N, R13E ; ............ Prudhoe Bay Unit ~ ...... ?L~I~,_~,,.,~ ~ Ti~CATIC>N~ 10. Well Number At Top Producing Interval / (23-34-1 1-13) 2693'SNL, 2241'EWL, SEC. 34, T11N, R13E 11. Field and Pool At Total Depth I~_~.:' ' :~' i~ Prudhoe Bay Field/Prudhoe Bay Pool 2829' SNL, 2309' EWL, SEC. 34, T11N, R13E 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 86.97' ADL 28287 12. Date Spudded 13. Date T.D. ReaChed 14. Date Comp., Susp. or Aband. J15. Water Depth, if offshore J16. No. of Completions 06-01-91 06-13-91 07-27-91J N/Aeet MSL J ONE 22. Type Electric or Other Logs Run DiI_/BHC/GR/SP/CNL 23. CASING, LINER AND CEMENTING F~-CO~ SE'I-tiNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Be'I-rOM HOLE ~ CEMENT]I',X~ RECORD AMOUNT PULLED 20' Surface 110' 10-3/4' 45# L-80 Surface 2685' 13-1/2" 2924 cu ft Coldset III & II v, 9-7/8' 29. 7# L-80 Surface 9417' 9-7/8" 1328 cu ft Class G 5-1/2' 17# NT~3CRSO 9149' 9841' 6-3/4" 176 CU ft Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MDI PACKER SET(MDI Schlumberger 3-3/8" @ 6 spf 4-1/2" 12. 6# 9151' 9092' MD TVDss NT13CRSO 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9539'-9606' 8865'-8924' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9616'-9637' 8933'-8951' 10-3/4" X 7-5/8" Freeze Protect Annulus with 9647'-9676' 8959'-8984' 175 bbls Dry Crude · 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) July27, 1991I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pressure 8ALCULATED..~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. Alaska Oil a Gas Cons. Commission Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS MATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag 9420' 8848' Shublik A 9448' 8873' Zone 4 9541' 8954' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed .-~~L~,,/,..~ ~ ~ ~ ~..T-itle Senior Technical Assistant Date ~/'/[~/5 /~ "''./- 'I'-/ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Monday. June 3. 1991 WELL: Y-34 PRUDHOE BAy UNIT APl No. 50-029-22178, Day: 2_ Depth at 0600 Hrs. = 2,700. Ft. 48 Hour Footage = 2,.7.00. Ft. Reason for Overexpenditure' Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #3 125446 Current Ooeration' Running 10-3/4" casing. Summary of Last 48, Hours.' Accepted rig at 0600 hrs (6/2/91) and spudded at 1800 hrs. Drilled the 13-1/2" hole to 2700'. Running 10-3/4" casing. Mud Type Mud Weight Viscosity P V ,YE ~ Solids .Ternp Spud 9.4#/gal 140Sec. 18 54 15.4cc 8% 60°F Survey Depth Angle DirectiQn N-S E-W Dog Leg TVD Section Coordinate Coordinate 0/100' Reviewed By: ~'~' ,,:;.'.:~ t .Alas/ca Oii & (4as Cons. Commission ~chorage BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Tuesday. June 4. 1991 . WELL: Y-34 PRUDHOE BAY UNIT APl No. 50-029-22178 Day: 3 Depth at 0600 Hrs. = 2,700. Ft. 24 Hour Footage = O Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #3 125446 Current Ooeration' Lay down BHA Summary of Last 24 Hours: Ran and cemented the 10 3/4" casing at 2685'. Mud Type Mud Weight Viscosity Low Solids 9 #/gal 34 Sec. PV YP Fluid Loss Solids ' Temp 6 3 19.0 cc 500% °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section O¢Qrdinate Coordinate °/100' Reviewed By: SS ! BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesda, y. June 5, 1991 WELL: Y-34 APl No. 50-029-22178 Day: 4_ Depth at 0600 Hrs. = 4,400 Ft. 24 Hour Footage = .1,700 Ft. Reason for Overexpenditure' Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Riq #3 125446 Current ©per~tiQn' Orient motor Summary of Last 24 Hours: Drilled the 9-7/8" hole to 4400'. RIH with motor. Mud Type .Mud Weight Viscosity Low solids 9.2 CC/gal 34 Sec. PV Y__P Fluid Loss Solids , Temp - ; 5 6 16.0cc 6% 78°F Survey Depth Angle Direction N-S E-W..Dog Le.g TVD SectiQn Coordinate Coordinate °/100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, June 6, 1991 WELL: Y-34 APl No. .--, 50-029-22178 Day: 5 Depth at 0600 Hrs. = .6,400 Ft. 24 Hour Footage = 2.000 Ft. Reason for Overexpenditure' Rig: Alaska United Riq #3 AFE Number: 125446 AFE Amount = Current Costs = Estimated Final Cost = Current Operation' Drilling Summary of Last 24 Hours' Drilled the 9-7/8" hole to 6400'. Muql Type Low Solids Mud Weiaht 9.2#/gal Viscosity 38Sec. P V YP Fluid LOSS Solids .Temp 8 6 8.0 cc 6.7% ,85 °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Eriday. June 7. 1991 WELL: Y-34 PRUDHOE BAY UNIT APl No. 50-029-22178 Day' 6 Depth at 0600 Hrs. = 7,070. Ft. 24 Hour Footage = 670 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Riq #3 125446 Current Operation' Drilling at 7070' Summary of Last 24 Hours: Drilled to 6608'. Tripped for BHA change. Drilled to 7070' Mud Type .Mud Weight Viscosity LSND 9.4#/gal 37Sec. P V YP Fluid Loss Solids ,Temp 8 5 7.9cc 7% ,81 °F Survey Depth Angle Direction N-S E-W Dog Le9 TVD Section .Coordinate Coordinate °/100' Reviewed By: MJS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: ,,P, RI, JDHOE BAY UNIT As of 0600 Hrs. MQnday. June 10. 1991 WELL: Y-34 - APl No. 50-029-22178 Day: 10 Depth at 0600 Hrs. = 9,425. Ft. 72 Hour Footage = 2,355 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Riq #3 125446 Current Operation' Tripping Summary of Last 72 Hours: Drilled the 9-7/8" hole to 9425'. Mud Type Low Solids Mud Weight 9.8#/gal Viscosity 37Sec. P. v .YP. Fluid Loss Solids Temp 8 6 5.4cc 9% ', °F Survey Depth Anole -- Direction TVD N-S E-W Dog Le.g Section Coordinate Coordinate °/1001 Reviewed By' SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesda, y, June 11. 1991 WELL: Y-34 ;: APl No. 50-029-22178 Day: 1 0 Depth at 0600 Hrs. = 9.425 Ft. 24 Hour Footage = O Ft. Reason for Overexpenditure' Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #3 125446 Current Operation' Test 7-5/8" Casing Pack-off Summary of Last 24 Hours: Ran and cemented the 7-5/8" casing. Mud Type Mud Weight Viscosity LSND 9.9#/gal 40Sec. PV, YP Fluid Loss Solids, Temp 12 8 5.0cc 9%. .",' °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By' SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, June 12, 1991 WELL: Y-34 :~ APl No. 50-029-221 78 Day: 1 1. Depth at 0600 Hrs. = 9,425 Ft. 24 Hour Footage = O Ft. Reason for Overexpenditure' Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #3 125446 Current Operation: Pick up 3-1/2" BHA Summary of Last 24 Hours' ~yed down 5" pipe and picked up 3-1/2" pipe to drill the 6-3/4" hole.. Mud Type Mud Weight .Viscosity P__V YP XC Polymer/Brine 8.9 #/gal 38 Sec. 8 1 1 Fluid Loss Solids Temp 7.0 cc 4 % - °F Survey Depth Angle Direction TVI~. N-S E-W Dog Leg Section .Coordinate Coordinate °/100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRIdDHOE BAY UNIT As of 0600 Hrs. Thursday. June 13. 1991 WELL: Y-;54 (2;5-;34-11-1;3) . APl No. 50-029-22178 Day: 1 2 Depth at 0600 Hrs. = 9,720 Ft. 24 Hour Footage = 295 Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #3 125446 Current Operatiorl; Drilling ahead. Summary_ 9f Last 24 Hours: Tested 7-5/8" casing to 3000 psi, ok. to 9720'. Drilled float equipment. Displaced to New Drill mud. Drilled Mud Type Mud Weight New Drill 8.9 #/gal Viscosity ..P V YP Fluid LOSS Solids ' Temp 39 Sec. 9 1 0 6.8 cc 3% 83 °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: ~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: As of 0600 Hrs. Friday, June 14. 1991 WELL: Y-34 ' PRUDHOE BAY UNIT AP! No. .50-029-2217~ Day: 1 3 Depth at 0600 Hrs. = 9,841 Ft. 24 Hour Footage = 1 21 Ft. Reason for Overexpenditure: Rig: Alaska United Rig #3 AFE Number: 125446 AFE Amount = Current Costs = Estimated Final Cost = Current Operation; LD HW DP. $~.mmary of Last 24Hours: Drilled to 9841' TD. Ran open hole logs. Prepare to run liner. Mud Type Mud Weight Viscosity New Drill 9 Cf/gal 38 Sec. pv YP Fluid Loss Solid~ 10 12 7.2cc 4% Temp 8i,oF Depth Angle Directign.. N-$ E-W Section Coordinate Coordinate Dog Leg 0/100, Reviewed By: ~ BP EXPLORATION (ALASKA), INC. DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, June 17. 1991 WELL: Y-34 APl No. ,,5O-O29-22178 Day: 1 6 Depth at 0600 Hrs. = 9,841 Ft. 72 Hour Footage = O Ft. Reason for Overexpenditure: Rig: AFE Number: AFE Amount = Current Costs = Estimated Final Cost = Alaska United Rig #3 125446 Current Operation; Running 4-1/2" tubing Summary of Last 72 Hours' Ran and cemented the 5-1/2" Chrome liner at 9841'. Washed and drilled out cement inside the 7-5/8" casing and liner. Displaced mud with brine. Pressure tested the liner ok. MudType Mud Weiqht .Viscosity P V YP Fluid Loss Solids Temp Brine 8.5#/gal Sec. cc °F Survey Depth Angle Direction N-S E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: SS BP EXPLORATION (ALASKA), INC. DAII,Y DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday. June 18. 1991 WELL: Y-34 .-.. APl No. 50-029-22178 Day: 1 7 Depth at 0600 Hrs. = 9,841 Ft. 24 Hour Footage = O Ft. Reason for Overexpenditure' Rig: AFE Number: AFE Amount = Current Costs = Estimated Final CoSt = Alaska United Rig #3 125446 Current Ooeration: Moving Rig to Y-35 Summary of Last 24 Hours: Ran and landed 4-1/2" chrome tubing. Freeze protected the well with diesel. Tested tubing packer ok. Released rig @ 0200 hrs on 6/18/91. MudType Mud Weight Viscosity P V YP, FlkJid LOss, Solids . Temp Cf/gal Sec. cc °F N-S E-W Dog Leg Survey Depth Angle Direction TVD Section C;0ordinate Coordinate °/100' Reviewed By: SS BP EXPLORATION Y-34 ORIGINAL. GREAT LAND DIRECTIONAL DRILLING, INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY BP EXPLORATION (ALASKA), INC. COMPANY Y-34 WELL NAME PRUDHOE BAY LOCATION AL591D26 MWD 06/17/91 JOB NUMBER DON LEJUENE TYPE SURVEY DIRECTIONAL SUPERVISOR DATE NAME T I T LE S I GNATURE 532 FT. 9367 FT. DEPTH INTERVAL FROM TO 05/31/91 06/10/91 DATE SURVEY TAKEN FROM TO THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF THE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL 'SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. iREAT LAND DIRECTIONAL DRILLING, llient .... : 'ield.,...: Iell ...... : ;ection at: :ng~neer..: BP EXPLORATION PRUDHOE BAY Y-34 S,49.77,E DON LEJUENE INC. Computation...: Survey Date...: RKB Elevation.: Reference ..... : Magnetic Dcln.: 06/17/91 RADIUS OF CURVATURE 06/10/91 86.97 ft 30.00 E : MEAS '. DEPTH : INCLN ANGLE VERTICAL-DEPTHS BKB SUB-SEA RECORD OF SURVEY (Well assumed vertical to 532 'MD) SECTION DIRECTION RELATIVE-COORDINATES DISTNCE BEARING FROM-WELL-HEAD 532 0.00 532.0 445.0 0.0 N 0.00 E 0.0 N 0.0 E 994 0.00 994:0 907.0 0.0 N 0.00 E 0.0 N 0.0 E 1513 0.00 1513.0 1426.0 0.0 N 0.00 E 0.0 N 0.0 E 1980 0.00 1980.0 1893.0 0.0 N 0.00 E 0.0 N 0.0 E 2485 0.00 2485.0 2398.0 0.0 N 0.00 E 0.0 N 0.0 E CLOSURE DL DISTNCE BEARING /100 0.0 N 0.00 E 0.00 0.0 N 0.00 E 0.00 0.0 N 0.00 E 0.00 0.0 N 0.00 E 0.00 0.0 N 0.00 E 0.00 3025 0.40 3025.0 2938.0 0.7 S 19.80 W 1.8 S 0.6 W 3494 0.30 3494.0 3407.0 0.7 S 59.20 W 3.9 S 2.4 W 3968 0.50 3968.0 3881.0 1.4 S 4.10 E 6.7 S 3.9 W 4357 0.80 4356.9 4270.0 2.9 S 43.60 W 10.8 S 5.3 W 4423 1.30 4422.9 4336.0 3.1 S 17.00 W 11.8 S 5.9 W 1.9 S 19.80 W 0.07 4.6 S 31.61 W 0.02 7.8 S 29.97 W 0.04 12.0 S 26.34 W 0.08 13.2 S 26.70 W 0.76 4518 3.10 4517.9 4430.9 5.6 S 23.80 E 15.4 S 5.7 W 4611 5.20 4610.6 4523.6 11.8 S 32.60 E 21.3 S 2.5 W 4706 8.20 4705.0 4618.0 22.5 S 35.00 E 30.5 S 3.6 E 4800 10.10 4797.8 4710.8 36.9 S 34.00 E 42.8 S 12.1 E 4893 12.90 4888.9 4801.9 54.9 S 39.30 E 57.7 S 23.1 E 1.6.4 S 20.43 W 1.90 21.4 S 6.81 W 2.26 30.7 S 6.77 E 3.16 44.5 S 15.77 E 2.02 62.2 S 21.87 E 3.02 4987 15.30 4980.0 4893.1 77.5 S 41.00 E 75.2 S 37.9 E 84.2 S 26.76 E 2.56 5082 17.10 5071.3 4984.3 103.7 S 42.40 E 95.0 S 55.5 E 110.0 S 30.32 E 1.90 5176 19.10 5160.6 5073.6 132.8 S 44.20 E 116.2 S 75.6 E 138.6 S 33.03 E 2.14 5269 21.40 5247.9 5160.9 164.8 S 46.30 E 138.9 S 98.4 E 170.2 S 35.33 E 2.49 5363 23.40 5334.8 5247.8 200.6 S 48.70 E 163.1 S 124.8 E 205.4 S 37.43 E 2.17 5456 25.00 5419.6 5332.6 238.7 S 51.90 E 187.4 S 154.2 E 242.7 S 39.44 E 1.83 'Survey Codes: 3/MWD 'PY34D B1.21) :-34 MEAS INCLN DEPTH ANGLE 5551 26.40 5645 28.70 5739 31.00 5832 32.50 5927 32.10 6022 32.00 6116 31.80 6211 31.30 6306 30.40 6399 29.40 6493 30.10 6597 30.90 6690 31.10 6788 31.11 6879 31.20 6975 31.30 7080 31.20 7165 31.30 7261 31.50 7356 31.30 7449 31.40 7543 30.90 7637 30.10 7731 30.10 7825 29.50 7920 29.10 VERTICAL-DEPTHS BKB SUB-SEA 5505.2 5418.2 5588.5 5501.5 5670.0 5583.1 5749.1 5662.2 5829.~4 5742.5 5909.9 5823.0 5989.7 5902.8 6070.7 5983.7 6152.3 6065.3 6232.9 6145.9 6314.5 6227.5 6404.1 6317.1 6483.8 6396.8 6567.7 6480.8 6645.6 6558.6 6727.7 6640.7 6817.4 6730.5 6890.1 6803.1 6972.0 6885.1 7053.1 6966.2 7132.6 7045.6 7213.0 7126.0 7294.0 7207.0 7375.3 7288.3 7456.9 7369.9 7539.7 7452.8 RECORD OF SURVEY (Well assumed vertical to 532 MD) SECTION DIRECTION RELATIVE-COORDINATES DISTNCE BEARING FROM-WELL-HEAD 279.9 S 54.70 E 212.0 S 187.2 E 323.1 S 55.80 E 236.8 S 222.9 E 369.5 S 58.20 E 262.3 S 262.1 E 418.0 S 58.20 E 288.1 S 303.7 E 468.2 S 57.90 E 315.0 S 346.8 E 518.1 S 57.90 E 341.7 S 389.5 E 567.2 S 58.90 E 367.8 S 431.8 E 616.3 S 57.90~E 393.8 S 474.2 E 664.5 S 58.60 E 419.4 S 515.6 E 710.4 S 58.20 E 443.7 S 555.1 E 756.5 S 58.20 E 468.3 S 594.7 E 808.6 S 59.30 E 495.7 S 639.8 E 855.9 S 59.29 E 520.2 S 681.0 E 905.8 S 58.90 E 546.2 S 724.5 E 952.3 S 58.90 E 570.5 S 764.8 E 1001.4 S 59.80 E 595.9 S 807.6 E 1055.0 S 60.00 E 623.2 S 854.7 E 1098.3 S 61.40 E 644.8 S 893.2 E 1147.3 S 61.40 E 668.7 S 937.1 E 1195.9 S 60.00 E 692.9 S 980.3 E 1243.5 S 59.99 E 717.1 S 1022.2 E 1291.4 S 59.30 E 741.7 S 1064.1 E 1338.6 S 57.90 E 766.6 S 1104.8 E 1385.3 S 57.20 E 791.8 S 1144.6 E 1431.6 S 56.80 E 817.3 S 1183.8 E 1477.9 S 54.70 E 843.5 S 1222.2 E Page 2 06/17/91 CLOSURE DL DISTNCE BEARING /100 282.8 S 41.44 E 1.58 325.2 S 43.27 E 2.46 370.8 S 44.98 E 2.54 418.6 S 46.51 E 1.61 468.5 S 47.76 E 0.43 518.2 S 48.74 E 0.11 567.2 S 49.58 E 0.36 616.4 S 50.29 E 0.60 664.7 S 50.87 E 0.97 710.6 S 51.36 E 1.08 757.0 S 51.78 E 0.74 809.4 S 52.23 E 0.82 856.9 S 52.63 E 0.22 907.3 S 52.99 E 0.11 95~.1 S 53.28 E 0.10 1003.6 S 53.58 E 0.27 1057.8 S 53.90 E 0.11 1101.6 S 54.18 E 0.46 1151.2 S 54.49 E 0.21 1200.4 S 54.74 E 0.45 1248.6 S 54.95 E 0.11 1297.1 S 55.12 E 0.57 1344.7 S 55.25 E 0.93 1391.8 S 55.32 E 0.19 1438.5 S 55.38 E 0.65 1485.0 S 55.39 E 0.67 'Survey Codes: 3/MWD ~-34 MEAS DEPTH 8012 8100 8195 8295 8389 INCLN ANGLE 28.10 27.40 27.90 28.30 28.20 VERTICAL-DEPTHS BKB, SUB-SEA 7620.5 7533.5 7698.4 7611.4 7782.5 7695.6 7870.8 7783.8 7953.6 7866.6 8482 28.40 8576 29.10 8664 29.30 8758 29.40 8867 29.70 8035.4 7948.5 8117.9 8030.9 8194.7 8107.7 8276.6 8189.6 8371.4 8284.5 8953 30.10 9054 30.20 9148 30.10 9248 29.60 9367 29.40 8446.0 8359.0 8533.3 8446.3 8614.6 8527.6 8701.3 8614.4 8804.9 8717.9 'Survey Codes: 3/MWD RECORD OF SURVEY (Well assumed vertical to 532 MD) SECTION DIRECTION RELATIVE-COORDINATES DISTNCE BEARING FROM-WELL-HEAD 1521.8 S 52.60 E 869.6 S 1257.7 E 1562.7 S 52.60 E 894.4 S 1290.3 E 1606.8 S 50.50,E 921.9 S 1324.8 E 1653.9 S 49.10 E 952.3 S 1360.8 E 1698.4 S 47.00 E 982.0 S 1393.8 E 1742.4 S 45.20 E 1012.6 S 1425.6 E 1787.4 S 43.80 E 1044.8 S 1457.3 E 1829.9 S 40.70 E 1076.6 S 1486.2 E 1875.3 S 38.90 E 1112.0 S 1515.6 E 1928.0 S 37.50 E 1154.2 S 1548.9 E 1969.7 S 35.40 E 1188.7 S 1574.4 E 2018.4 S 31.90 E 1230.9 S 1602.5 E 2063.2 S 30.50 E 1271.3 S 1626.9 E 2109.9 S 28.70 E 1314.6 S 1651.5 E 2164.0 S 25.90 E 1366.7 S 1678.4 E Page 3 06/17/91 CLOSURE DL DISTNCE BEARING /100 1529.0 S 55.34 E 1.20 1570.0 S 55.27 E 0.80 1614.0 S 55.17 E 0.72 1660.9 S 55.02 E 0.51 1705.0 S 54.83 E 0.51 1748.6 S 54.61 E 0.49 1793.1 S 54.36 E 0.82 1835.1 S 54.08 E 0.87 1879.8 S 53.73 E 0.47 1931.7 S 53.31 E 0.42 1972.7 S 52.95 E 0.77 2020.7 S 52.47 E 0.88 2064.7 S 52.00 E 0.39 2110.8 S 51.48 E 0.67 2164.4 S 50.84 E 0.59 ~-34 ;UBSEA )EPTH 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 2500 2600 2700 2800 2900 MEAS DEPTH 587 687 787 887 987 1087 1187 1287 1387 1487 1587 1687 1787 1887 1987 2087 2187 2287 2387 2487 2587 2687 2787 2887 2987 DATA INTERPOLATED FOR 100 ~Well assumed verti Page FT SUBSEA INTERVAL cal to 532 MD) 4 06/17/91 INCLN TVD MD-TVD VERT ANGLE BKB DIFF CRRT 0.00 587 0 0.00 687 0 0.00 787 0 0.00 887 0 0.00 987 0 DIRECTION BEARING 0 N 0.00 E 0 N 0.00 E 0 N 0.00 E 0 N 0.O0 E 0 N 0.00 E RELATIVE COORDINATES FROM WELL HEAD 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 1087 0 0.00 1187 0 0.00 1287 0 0.00 1387 0 0.00 1487 0 0 N 0.00 E 0 N 0.00 E 0 N 0.00 E 0 N 0.00 E 0 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 1587 0 0.00 1687 0 0.00 1787 0 0.00 1887 0 0.00 19~7 0 0 N 0.00 E 0 N 0.00 E 0 N 0.00 E 0 N 0.00 E 0 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N 0.00 E 0.00 2087 0 0.00 2187 0 0.00 2287 0 0.00 2387 0 0.00 2487 0 0 N 0.00 E 0 N 0.00 E 0 N O.O0 E 0 N 0.0O E 0 S 19.80 W 0.00 N 0.00 E 0.00 N 0.00 E 0.00 N O.00 E 0.00 N 0.00 E 0.00 S 0.00 W 0.08 2587 0 0.15 2687 0 0.22 2787 0 0.30 2887 0 0.37 2987 0 0 S 19.80 W 0 S 19.80 W 0 S 19.80 W 0 S 19.80 W 0 S 19.80 W 0.06 S 0.02 W 0.25 S 0.09 W 0.55 S 0.20 W 0.98 S 0.35 W 1.53 S 0.55 W 3000 3087 0.39 3087 0 0 S 25.01 W 2.17 S 0.80 W ~-34 ~UBSEA )EPTH 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 4400 4500 4600 4700 4800 4900 5000 5100 5200 5300 5400 5500 MEAS DEPTH 3187 3287 3387 3487 3587 3687 3787 3887 3987 4087 4187 4287 4387 4487 4587 4688 4789 4891 4994 5098 5204 5311 5420 5531 5643 Page 5 06/17/91 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL (Well assumed vertical to 532 MD) INCLN TVD MD-TVD VERT DIRECTION RELATIVE COORDINATES ANGLE BKB DIFF CRRT BEARING FROM WELL HEAD 0.37 3187 0 0 S 33.41 W 2.74 S 1.12 W 0.34 3287 0 0 S 41.81 W 3.23 S 1.50 W 0.32 3387 0 0 S 50.21 W 3.62 S 1.93 W 0.30 3487 0 0 S 58.61 W 3.92 S 2.39 W 0.34 3587 0 0 S 46.78 W 4.25 S 2.84 W 0.38 3687 0 0 S 33.43 W 4.73 S 3.25 W 0.42 3787 0 0 S 20.07 W 5.34 S 3.58 W 0.47 3887 0 0 S 6.72 W 6.07 S 3.80 W 0.51 3987 0 0 S 1.77 E 6.90 S 3.87 W 0.59 4087 0 0 S 10.49 W 7.86 S 3.94 W 0.67 4187 0 0 S 22.76 W 8.91 S 4.24 W 0.75 4287 0 0 S 35.02 W 10.01 S 4.79 W 1.03 4387 0 0 S 31.50 W 11.14 S 5.62 W 2.51 4487 0 0 S 10.52 E 13.91 S 6.05 W 4.66 4587 0 0 S 30.35 E 19.53 S 3.59 W 7.63 4687 1 1 S 34.54 E 28.44 S 2.20 E 9.88 4787 2 1 S 34.12 E 41.24 S 11.02 E 12.84 4887 4 2 S 39.19 E 57.34 S 22.88 E 15.44 4987 7 3 S 41.11 E 76.62 S 39.16 E 17.45 5087 11 4 S 42.71 E 98.57 S 58.85 E 19.79 5187 17 6 S 44.83 E 122.86 S 82.10 E 22.30 5287 24 7 S 47.38 E 149.61 S 109.87 E 24.38 5387 33 9 S 50.66 E 178.04 S 142.47 E 26.10 5487 44 11 S 54.10 E 206.81 S 179.89 E 28.66 5587 56 13 S 55.78 E 236.35 S 222.21 E 5600 5759 31.32 5687 72 16 S 58.20 E 267.70 S 270.84 E [-34 ~UBSEA )EPTH 5700 5800 5900 6000 6100 6200 6300 6400 6500 6600 6700 6800 6900 7000 7100 7200 7300 7400 7500 7600 7700 7800 7900 8000 8100 MEAS DEPTH 5877 5995 6113 6230 6346 6461 6577 6694 6810 6927 7044 7161 7278 7396 7513 7629 7744 7860 7974 8087 8200 8313 8427 8541 8655 Page 6 06/17/91 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL (Well assumed vertical to 532 MD) INCLN TVD ANGLE BKB MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 32.31 5787 90 18 S 58.06 E 300.77 S 324.13 E 32.03 5887 108 18 S 57.90 E 334.11 S 377.34 E 31.81 5987 126 18 S 58.87 E 366.88 S 430.35 E 31.12 6087 143 17 S 58.04 E 399.04 S 482.51 E 29.97 6187 159 16 S 58.43 E 429.99 S 532.80 E 29.86 6287 174 15 S 58.20 E 459.95 S 581.21 E 30.75 6387 190 16 S 59.09 E 490.47 S 631.05 E 31.10 6487 207 17 S 59.28 E 521.13 S 682.65 E 31.13 6587 224 17 S 58.90 E 552.16 S 734.40 E 31.25 6687 240 17 S 59.35 E 583.35 S 786.29 E 31.23 6787 257 17 S 59.93 E 613.95 S 838.75 E 31.30 6887 274 17 S 61.34 E 643.85 S 891.52 'E 31.46 6987 292 17 S 61.14 E 673.10 S 945.12 E 31.34 7087 309 17 S 60.00 E 703.23 S 998.10 E 31.06 7187 326 17 S 59.52 E 733.75 S 1050.67 E 30.17 7287 342 16 S 58.02 E 764.39 S 1101.39 E 30.01 7387 357 16 S 57.14 E 795.50 S 1150.29 E 29.35 7487 373 15 S 56.04 E 826.68 S 1197.94 E 28.51 7587 387 14 S 53.47 E 858.69 S 1243.27 E 27.50 7687 400 13 S 52.60 E 890.84 S 1285.54 E 27.92 7787 413 13 S 50.43 E 923.35 S 1326.59 E 28.28 7887 426 13 S 48.69 E 958.00 S 1367.33 E 28.28 7987 440 14 S 46.27 E 994.32 S 1406.89 E 28.84 8087 454 14 S 44.33 E 1032.53 S 1445.41 E 29.28 8187 468 14 S 41.01 E 1073.33 S 1483.33 E 8200 8770 29.43 8287 483 15 S 38.75 E 1116.54 S 1519.31 E f-34 ~UBSEA MEAS )EPTH Page 7 DATA INTERPOLATED FOR 100 FT SUBSEA INTERVAL (Well assumed vertical to 532 MD) INCLN TVD DEPTH ANGLE BKB 8300 8885 8400 9000 8500 9116 8600 9231 8700 9346 06/17/91 MD-TVD VERT DIRECTION RELATIVE COORDINATES DIFF CRRT BEARING FROM WELL HEAD 29.78 8387 498 15 S 37.06 E 1161.30 S 30.15 8487 513 15 S 33.76 E 1208.30 S 30.13 8587 529 16 S 30.98 E 1257.55 S 29.68 8687 545 15 S 29.00 E 1307.44 S 29.43 8787 559 15 S 26.38 E 1357.58 S 1554.27 E 1587.86 E 1618.73 E 1647.56 E 1673.93 E :-34 Page 8 DATA INTERPOLATED FOR 1000 FT MEASURED DEPTH INTERVAL 06/17/91 MEAS INCLN VERT-DEPTHS SECT DIRECTION REL-COORDINATES CLOSURE DEPTH ANGLE' BKB SUB-S DIST BEARING FROM-WELLHEAD DIST BEARING DL/ 100 1000 0.00 1000 913 2000 0.00 2000 1913 3000 0.38 3000 2913 4000 0.52 4000 3913 5000 15.55 4993 4906 0 N 0.00 E 0 N 0 E 0 N 0.00 E 0 N 0 E 1 S 19.,80 W 2 S 1 W 2 S 0.18 E 7 S 4 W 81 S 41.19 E 78 S 40 E 0 N 0.00 E 0.0 0 N 0.00 E 0.0 2 S 19.80 W 0.1 8 S 28.88 W 0.1 88 S 27.32 E 1.9 6000 32.02 5891 5804 507 S 57.90 E 3'36 S 7000 31.28 6749 6662 1014' S 59.85 E 602 S 8000 28.23 7610 7523 1516 S 52.87 E 866 S 9000 30.15 8487 8400 1992 S 33.77 E 1208 S 380 E 507 S 48.53 E 0.1 819 E 1017 S 53.66 E 0.1 1253 E 1523 S 55.35 E 1.2 1588 E 1995 S 52.73 E 0.9 BP EXPLORATION <KB> o looo ' ,.. Y-34 VERTICAL SECTION VIE~ Section at: S 49.77 E TVO Scale.: i inch = t000 feet Bep Scale.: 1 inch = 1000 feet Brawn ..... : 06/18/9i Gmeat tanU Directional D~illin9 Marker Identification NO TVD SECTN INCLN A) KB o o 0 o.0o B) TO 9367 8805 2~64 29.40 401 7000 - ,, 8000 9000 I ! ! t ! I I~L~E ~E~ ~ FOI~. 5868 2000 3000 Section Departure 4000 5000 /V BP EXPLORATION Harker Iden~if ica~ion 8) TO 0 9367 N/S ON t367 S OE 1678 E Y-34 PLAN VZEN CLOSURE ..... : 2164 ft S 50.84 E DECLINATION.: 30.00 E SCALE ....... : 1 inch = 400 feet DRAWN ....... : 06/~8/9~ Sreat LanU Directional Drilling · · 0 ., l;,& . I%"-. 400 ...... It ; \ 800 ~ -, ~oo ~ : ".-% t600~ 2400 0 400 800 t200 t600 <- WEST · EAST -> 2000 Teleco Oilfield Se "~""-s Inc, 6116 Nielson way Anchorage, AK 99518 (907) 562-2646 June 13, 1991 JOB #830 BP EXPLORATION (ALASKA) INC. WELL: Y-34 ~ PRUDHOE BAY R IGiN VL Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, ~ Jonathan G. Mapes Field Operations Supervisor JGM/el Enclosures Gas Cons. 6ommission A $~A1' COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Date 6/10/91 Company: BP EXPLORATION Well: Y-34 Location: PBU Rig: AUDI #3 TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed Direction: 830TAK 0.0° 30.0° 30.0° 130.2° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* TIE-IN TO SURFCE 0 0 0.0 0.0 0.01 0.00 0.01N 0.01E 0.01 N 45.00E 0.00 TIE-IN TO SPERRY-SUN GYRO SURVEY 2485 3025 3494 3968 2485 0.0 0.0 2485.01 -0.14 0.23N 0.01E 0.23 N 2.53E 0.00 540 0.4 199.8 3025.01 0.49 1.50S 0.63W 1.63 S 22.74W 0.08 469 0.3 239.2 3494.00 0.66 3.67S 2.24W 4.30 S 31.38W 0.05 474 0.5 175.9 3967.99 1.70 6.37S 3.16W 7.11 S 26.37W 0.10 PAGE 1 Company: BP EXPLORATION, Well: Y-34, Location: PBU, Riq: AUDI #3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 4357 389 0.8 223.6 4356.96 2.73 10.03S 4.91W 11.16 S 26.08W 0.15 4423 66 1.3 197.0 4422.95 3.00 11.08S 5.44W 12.34 S, 26.17W 1.04 4518 95 3.1 156.2 4517.88 5.73 14.46S 4.72W 15.21 S 18.09W 2.40 4611 93 5.2 147.4 4610.64 12.02 20.31S 1.44W 20.36 S 4.05W 2.35 4706 95 8.2 145.0 4704.98 22.69 29.49S 4.77E 29.87 S 9.19E 3.17 4800 94 10.1 146.0 4797.78 37.10 41.82S 13.22E 43.86 S 17.55E 2.03 4893 93 12.9 140.7 4888.90 55.16 56.61S 24.36E 61.63 S 23.28E 3.22 4987 94 15.3 139.0 4980.07 77.74 74.10S 39.14E 83.80 S 27.84E 2.59 5082 95 17.1 137.6 5071.29 103.98 93.87S 56.78E 109.71 S 31.17E 1.94 5176 94 19.1 135.8 5160.63 133.00 115.11S 76.82E 138.39 S 33.72E 2.21 5269 93 21.4 133.7 5247.88 165.08 137.74S 99.70E 170.04 S 35.90E 2.59 5363 94 23.4 131.3 5334.79 200.86 161.91S 126.13E 205.24 S 37.92E 2.34 5456 93 25.0 128.1 5419.61 238.98 186.23S 155.47E 242.60 S 39.86E 2.23 5551 95 26.4 125.3 5505.21 280.09 210.83S 188.52E 282.82 S 41.80E 1.94 PAGE 2 Company: BP EXPLORATION, Well: Y-34, Location: PBU, Riq: AUDI #3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 5645 94 28.7 124.2 5588.55 323.36 235.60S 224.25E 325.26 S 43.59E 2.51 5739 94 31.0 121.8 5670.07 369.77 261.05S 263.50E 370.91 S 45.27E 2.77 5832 93 32.5 121.8 5749.15 418.18 286.84S 305.10E 418.76 S 46.77E 1.60 5927 95 32.1 122.1 5829.45 468.42 313.70S 348.17E 468.65 S 47.98E 0.45 6022 95 32.0 122.1 5909.96 518.33 340.49S 390.88E 518.39 S 48.94E 0.09 6116 94 31.8 121.1 5989.76 567.45 366.53S 433.19E 567.45 S 49.77E 0.60 6211 95 31.3 122.1 6070.72 616.59 392.57S 475.53E 616.64 S 50.46E 0.76 6306 95 30.4 121.2 6152.28 664.76 418.13S 517.00E 664.92 S 51.03E 1.06 6399 93 29.4 121.8 6232.90 710.58 442.35S 556.53E 710.91 S 51.52E 1.12 6493 94 30.1 121.8 6314.51 756.72 466.93S 596.17E 757.26 S 51.93E 0.74 6597 104 30.9 120.7 6404.12 808.85 494.31S 641.29E 809.69 S 52.38E 0.94 6690 93 31.1 120.7 6483.83 856.09 518.76S 682.48E 857.26 S 52.76E 0.22 6788 98 31.1 121.1 6567.75 906.04 544.76S 725.92E 907.59 S 53.11E 0.21 PAGE 3 Company: BP EXPLORATION, Well- Y-34, Location: PBU, Riq: AUDI ~3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 6879 91 31.3 121.1 6645.59, 952.59 569.11S 766.28E 954.50 S 53.40E 0.22 6975 96 31.3 120.0 6727.61 1001.75 594.46S 809.23E 1004.11 S 53.70E 0.59 7080 105 31.2 120.0 6817.38 1055.36 621.70S 856.40E 1058.27 S 54.02E 0.10 7165 85 31.3 118.6 6890.05 1098.65 643.29S 894.85E 1102.07 S 54.29E 0.87 7256 91 31.5 118.6 6967.72 1145.09 665.98S 936.47E 1149.14 S 54.58E 0.22 7356 100 31.3 120.0 7053.08 1196.24 691.48S 981.90E 1200.95 S 54.85E 0.76 7449 93 31.4 120.0 7132.50 1243.86 715.68S 1023.80E 1249.15 S 55.04E 0.11 7543 94 30.9 120.7 7212.95 1291.76 740.25S 1065.76E 1297.62 S 55.22E 0.65 7638 95 30.1 122.1 7294.80 1339.40 765.36S 1106.92E 1345.75 S 55.34E 1.13 77~1 93 30.1 122.8 7375.26 1385.61 790.39S 1146.27E 1392.36 S 55.41E 0.38 7825 94 29.5 123.2 7456.83 1431.95 815.83S 1185.45E 1439.05 S 55.46E 0.67 7920 95 29.1 125.3 7539.68 1478.19 841.99S 1223.88E 1485.54 S 55.47E 1.16 8012 92 28.1 127.4 7620.45 1522.12 868.08S 1259.35E 1529.55 S 55.42E 1.54 PAGE 4 Company:..BP EXPLORATION, Well: Y-34, Location: PBU, Riq: AUDI #3 Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 8100 88 27.4 127.4 7698.33 1563.04 892.96S 1291.90E 1570.48 S 55.35E 0.80 8195 95 27.9 129.5 7782.49 1607.10 920.38S 1326.42E 1614.46 S 55.24E 1.15 8295 100 28.3 130.9 7870.70 1654.20 950.78S 1362.39E 1661.35 S 55.09E 0.77 8389 94 28.2 133.0 7953.50 1698.66 980.52S 1395.47E 1705.51 S 54.91E 1.07 8482 93 28.4 134.8 8035.39 1742.66 1011.09S 1427.24E 1749.09 S 54.69E 0.94 8570 88 29.1 136.2 8112.54 1784.80 1041.29S 1456.90E 1790.76 S 54.45E 1.10 8664 94 29.3 139.3 8194.60 1830.25 1075.22S 1487.72E 1835.60 S 54.14E 1.62 8758 94 29.4 141.1 8276.54 1875.62 1110.62S 1517.21E 1880.26 S 53.80E 0.95 8867 109 29.7 142.5 8371.36 1928.28 1152.86S 1550.45E 1932.09 S 53.37E 0.69 8953 86 30.1 144.6 8445.92 1970.00 1187.34S 1575.91E 1973.14 S 53.00E 1.30 9054 101 30.2 148.1 8533.26 2018.71 1229.56S 1604.01E 2021.05 S 52.53E 1.74 9148 94 30.1 149.5 8614.54 2063.46 1269.94S 1628.46E 2065.10 S 52.05E 0.76 9248 100 29.6 151.3 8701.28 2110.18 1313.21S 1653.05E 2111.18 S 51.54E 1.03 PAGE 5 Company: BP EXPLORATION, Well: Y-34, Location: PBU, Riq: AUDI Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 9343 95 29.4 153.7 8783.96 2153.46 1354.69S 1674.65E 2153.98 S 51.03E 1.26 9367 24 29.4 153.7 8804.87 2164.27 1365.26S 1679.87E 2164.69 S 50.90E 0.00 PAGE 6 000~ 00~£ 008~ 00~ O00g ~ OOg~ CD oo 007~ 008 00~ 00~ oog~ 00~ IS¥~ 00~ :~aa~ 00~ = qou~ I O0/NVIO£9 #~OP £~ ionv hsd NOIIVUOqdXH : OOt~ ~t3IA NV-Id 3 ~ ^daS p [ ia ~ :1- '[ ~0 03~,31 lO00 2OOO ..~3000 4000 >5000 5000 7000 BO00 9000 -lO00 TEt, -'CO Oilfield Sepv'ices ' VERTICAL PROJECTION 1000 2000 3000 4000 5000 BP EXPLORATION Y-34 PBU AUDI #3 dOB# B30TAK/O0 SCALE: 1 inch = lO00 feet 2485 ' .O:t deg 3025 ' .4 deg 3494 .3 deg 3968 ' .5 deg 4357 ' .8 deg 46~ 5.2 deg 4893 ' 12.9 deg %~5176 ' !9.~ deg +~5456 ' 25.0~ deg + 5739 ' , 3~.~& deg k~~022 3_.03 deg -~6306 ' 30.4 deg 6597 ' 30.9 deg 7879 ' 3~.3 deg ~65 ' 3~.3 deg 49 ' 31.4 deg 731 ' 30.~ deg 8012 ' 28.~ deg 8295 ' 28.3 deg 570 ' 29.~ deg 8867 ' 29.7 deg VERTICAL SECTION (ft) SUB - S URFA CE DIRECTIONAL SURVEY ~] UIDANCE !'~ ONTINUOUS ~-~ OOL Company BP EXPLORATION Well Name Y-34 (23-34-11-13) (1257' FNL, 512' FWL, S. EC 34, T11N, R13E) Field/Location PRUDHOE BAY~ NORTH SLOPE, ALASKA Job Reference No. Date i-q',j '-,- ~ 74834 25-JUL-91 ; ',:-:i :'J-: i i J ~ ' Logged By: '_~_L_/ / Computed By JOHNSON SINES SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR BP EXPLORATION Y-34(23-34-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA SURVEY DATE: 25-JUL-1991 METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION: TANGENTIAL- LINEAR HORIZ. DIST. ENGINEER: JOHNSON Averaged deviation and azimuth PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 49 DEG 30 MIN EAST COMPUTATION DATE: 15-AUG-91 PAGE BP EXPLORATION Y-34(23-34-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 25-JUL-1991 KELLY BUSHING ELEVATION: 86.97 FT ENGINEER: JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH ' DEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG MIN 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 O0 700 O0 800 O0 900 Ob 0.00 100.00 13 200.00 113 300.00 213 400.00 313 500.00 413 600.0O 513 700.00 613 800.00 713 900.00 813 -136 97 O3 03 O3 O3 03 03 03 03 03 0 0 N 0 0 E 0 5 S 66 44 E 0 11 55936 E 0 8 S 0 28 E 0 11 S 57 54 E 0 4 S 13 46 W 0 8 553 6 E 0 6 N 48 30 E 0 1 N 54 14 E 0 6 N 30 51 E 0 O0 0 03 0 33 0 63 0 76 0 97 1 O5 1 11 1 18 1 11 0.00 0.00 0 O0 015 0 15 0 07 0 O0 0 24 001 0 O0 0.00 N 0.02 N 0.14 S 0.41 S 0.48 S 0.68 S 0.70 S 0.74 S 0.70 S 0.58 S 0 O0 E 0 05 E 031 E 0 48 E 0 59 E 0 69 E 0 79 E 0 83 E 0 95 E 0 97 E 0 O0 N 0 0 E 05 N 72 29 E 34 S 66 27 E 63 S 49 39 E 76 S 50 49 E 97 5 45 35 E 05 S 48 31 E 11 S 48 27 E 18 S 53 34 E 13 S 59 18 E 1000 O0 1000 O0 913 03 1100 O0 1100 1200 O0 1200 1300 O0 1300 1400 O0 1400 1500 O0 1500 1600.00 1600 1700.00 1700 1800.00 1800 1900.00 1900 O0 1013 03 O0 1113 03 O0 1213 03 O0 1313 03 O0 1413 03 O0 1513 03 O0 1613 03 O0 1713 03 O0 1813 03 0 0 N 22 57 E 0 6 N 25 13 W 0 5 N 32 44 E 0 1 N 71 25 W 0 2 N 2 21 E 0 2 N 31 23 E 0 3 N 28 41 E 0 3 N 37 52 E 0 2 S 14 9 E 0 5 S 50 42 W 1 13 1 04 0 96 0 95 0 90 0 86 0 85 0 85 0 88 0 88 0 O0 0 O0 0 O0 0 O0 0 O0 0 08 0 O0 0.00 0.16 0.20 0.50 S 0.41 S 0.26 S 021 S 0 17 S 0 10 S 0 05 S 0 O0 N 0 02 N 0095 ~ 05 E t 02 E 1 04 E 1 O? E 1 04 E 1 04 E 1 07 E 1 13 E 1 18 E 1 08 E 1 17 5 64 28 E 1 10 S 67 47 E 1 07 S 76 12 E 1 09 S 78 44 E 1 06 S 80 5O E 1 04 S 84 24 E 1 07 S 87 22 E 1 13 N 89 48 E 1 18 N 89 8 E 1 09 S 85 13 E 2000.00 2000 O0 1913 03 2100 O0 2100 2200 O0 2200 2300 O0 2300 2400 O0 2400 2500 O0 2500 2600 O0 260O 2700.00 2700 2800.00 2800 2900,00 2900 O0 2013 03 O0 2113 O3 O0 2213 03 OO 2313 03 O0 2413 03 O0 2513 03 O0 2613 03 O0 2713 03 O0 2813.03 0 14 S 0 48 E 0 11 S 6 41W 0 8 S 37 47 E 0 2 S 16 20 E 0 3 N 36 14 E O. 5 N 64 32 E 0 6 N 81 48 E 0 4 N 75 59 E 0 5 S 89 16 E 0 7 S 4 39 w 1 01 1 23 1 48 1 61 1 61 1 63 1 T1 1 8O 1 90 2 O0 0.20 0.23 0.17 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0 32 S 0 73 S 1 O0 S 1 12 S 1 11 S 1 04 S 1 O0 S 0 98 S 0985 1 O9 S 1 06 E 1 O0 E 1 10 E 1 16 E 1 17 E 25 E 1 40 E 53 E 1 66 E 1 70 E 1 11 S 73 26 E 24 S 53 42 E 48 S 47 37 E 61 S 45 56 E 62 S 46 26 E 63 S 50 25 E 72 S 54 28 E 82 S 57 26 E 93 S 59 24 E 02 S 57 21 E 3000.00 3000 O0 2913.03 3100.00 3099 3200 O0 3199 3300 O0 3299 3400 O0 3399 3500 O0 3499 3600 O0 3599 3700 O0 3699 3800 O0 3799 3900 O0 3899 99 3013.02 99 3113.02 99 3213.02 99 3313.02 99 3413.02 99 3513.02 98 3613.01 98 3713.01 98 3813.01 0 19 S 26 40 w 0 21 S 10 11 w 0 16 S 9 48 w 0 18 S 29 29 w 0 18 S 14 33 w 0 18 S 30 43 w 0 23 S 37 37 w 0 24 S 41 11 w 0 29 S 28 57 w 0 25 S 13 55 w 212 2 33 2 62 2 79 2 94 3 07 3 11 3 12 321 3 44 0 O0 0 2O 0 O0 0 O0 0 22 0 O0 0 O0 0 O0 0 O9 0 O0 1 43 S 2 O0 S 2 52 S 2 97 S 3 45 S 3 93 S 4 38 S 4 93 S 5 57 S 6 29 S 1 56 E 1 35 E 1 29 E 1 13 E 0 92 E 0 67 E 0 35 E 0 lOW 0 53 W 0 85 W 2 12 S 47 27 E 2 42 S 34 3 E 2 83 S 27 11 E 3 18 S 20 48 E 3 57 S 14 55 E 399 S 944 E 4 40 S 4 30 E 493 S 1 9 W 5 59 S 5 26 W 6.35 S 7 41 W COMPUTATION DATE: 15-AUG-91 PAGE 2 BP EXPLORATION ¥-34(23-34-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 25-JUL-1991 KELLY BUSHING ELEVATION: 86,97 FT ENGINEER: JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WES7 DIST, AZIMUT~ FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 3999 98 3913 01 4100 4200 4300 4400 4500 4600 4700 4800 4900 0 26 O0 4099 O0 4199 O0 4299 O0 4399 O0 4499 ,00 4599 O0 4699 ,00 4797 O0 4895 97 4013 O0 0 31 97 4113 O0 0 39 96 4212 99 0 50 95 4312 98 1 0 90 4412 93 2 25 68 4512,71 5 0 02 4612,05 7 55 77 4710,80 10 16 65 4808,68 13 10 S 14 57 W S 22 49 W S 27 10 W S 40 37 W S 31 43 W S 16 18 E S 30 50 E S 33 13 E S 32 59 E S 37 10 E 3,78 4,10 4,35 4,48 4,51 6,39 12,49 23,36 38,36 58,16 0 O0 0 47 0 O0 0 66 1 38 3 35 3 24 2 61 3 52 2 88 7,01 S 7 77 S B 77 S 9 78 S 10 97 S 13 8O S 19 64 S 29 19 S 42 46 S 59 06 S 1 02 W 1 24 W 1 77 W 2 46 W 3 44 W 3 39 W 0 36 W 5 79 E 14 18 E 26 05 E 7 09 S 8 14 W 7 8 10 11 14 19 29 44 64 87 S 9 5 W 95 S 11 24 W 08 S 14 6 W 50 S 17 25 W 21 S 13 47 W 65 S 1 3 W 76 S 11 13 E 77 S 18 28 E 55 S 23 48 E 5000 O0 4992,48 4905,51 15 36 5100 5200 5300 5400 5500 5600 5700 5800 5900 O0 5088,34 5001,37 17 32 O0 5183,08 5096,11 19 48 O0 5276,43 5189,46 22 3 O0 5368,40 5281,43 24 13 O0 5459,08 5372.11 25 29 O0 5548,65 5461,68 27 35 O0 5636,21 5549.24 30 6 O0 5721.71 5634.74 32 12 O0 5806,15 5719,18 32 20 539 18 E S 41 46 E S 44 16 E 546 18 E S 50 10 E S 52 46 E S 55 39 E S 57 38 E S 59 20 E S 59 43 E 82 61 110 73 142 51 178 23 217 47 259 57 303 89 351 77 402,97 455.72 2 54 2 5O 2 67 2 32 2 75 1 52 2 88 2 33 1 19 0 54 78 69 S 100 123 148 175 201 227 253 280 307 41.43 E 31 S 59.94 E 116 65 S 81,80 E 148 87 S 107,23 E 183 09 S 136,45 E 221 24 S 169,48 E 263 28 S 205.52 E 306 75 S 245,88 E 353 79 S 290,12 E 403 96 S 336,30 E 455 88 93 S 27 46 E 86 S 30 52 E 26 S 33 29 E 47 S 35 46 E 98 S 37 56 E 10 S 40 6 E 42 S 42 7 E 34 S 44 6 E 75 S 45 56 E 99 S 47 31 E 6000 O0 5890 75 5803 78 32 8 6100 6200 6300 6400 6500 6600 670O 6800 6900 O0 5975 O0 6060 O0 6146 O0 6233 O0 6319 O0 64O5 O0 6491 O0 6576 O0 6662 48 5888 57 5973 43 6O59 09 6146 72 6232 71 6318 38 6404 92 6489 44 6575 S 60 10 E 51 31 59 S 60 5 E 60 31 17 S 59 40 E 46 30 21 S 58 49 E 12 29 40 S 58 30 E 75 30 21 S 58 43 E 74 30 56 S 59 13 E 41 31 11 S 59 28 E 95 31 11 S 59 39 E 47 31 15 S 59 54 E 964 508.16 560 34 612 01 662 53 711 81 761 14 811 48 862 31 913 32 32 0,20 0,25 0,90 0,98 0,22 0.76 0,36 0,26 0,24 0,4O 334 68 S 382,44 E 508,20 S 48 49 E 361 09 S 428,50 E 560,36 S 49 53 E 387 42 S 473,96 E 612,15 S 50 44 E 413 64 S 518,01 E 662,89 S 51 24 E 439 65 S 560.59 E 712.43 S 51 54 E 465 70 S 603,23 E 762,07 S 52 20 E 492 03 S 646,94 E 812,79 S 52 45 E 518,32 S 691,33 E 864,05 S 53 8 E 544,57 S 735,99 E 915.55 S 53 30 E 570,66 S 780,77 E 967,09 S 53 50 E 7000,00 6747,88 6660 91 31 18 7100,00 6833 36 6746 7200,00 6918 7300,00 7004 7400,00 7089 7500,00 7175 7600,00 7260 7700,00 7347 7800,00 7433 7900,00 7520 83 6831 26 6917 64 7O02 03 7088 84 7173 14 7260 70 7346 74 7433 S 60 6 E 1015 40 39 31 14 S 60 0 E 1066 86 31 18 S 60 5 E 1117 29 31 20 S 60 18 E 1168 67 31 29 S 60 9 E 1219 06 31 7 S 59 32 E 1270 87 30 41 . S 58 51 E 1321 17 30 8 S 58 4 E 1371 73 29 49 S 57 10 E 1420 77 29 16 S 55 30 E 1469 42 46 55 7O 89 52 42 99 86 0 11 0 19 0 02 0 O0 0 58 0 86 0 85 0 55 0 86 0,94 596.64 S 825 76 E 1018,76 S 54 9 E 622,56 S 870 648,52 S 915 674,38 S 960 700.23 S 1005 726,33 S 1050 752,68 S 1095 779,13 S 1138 805,93 S 1180 833,18 S 1221 72 E 1070,39 S 54 26 E 67 E 1122,07 S 54 42 E 77 E 1173.82 S 54 56 E 96 E 1225.67 S 55 10 E 98 E 1277,54 S 55 21 E 06 E 1328,79 S 55 30 E 10 E 1379,24 S 55 36 E 40 E 1429,29 S 55 41 E 39 E 1478,51 S 55 42 E COMPUTATION DATE: 15-AUG-91 PAGE 3 BP EXPLORATION Y-34(23-34-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEYS: 25-JUL-1991 KELLY BUSHING ELEVATION: 86.97 FT ENGINEER: JOHNSON INTERPOLATED VALUES FOR EVEN lO0 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8000 O0 7608.29 7521.32 28 22 8100 O0 7696.66 7609.69 27 33 8200 O0 7785.25 7698.28 27 53 8300 O0 7873.45 7786.48 28 18 8400 O0 7961.45 7874 48 28 20 8500 O0 8049.37 7962 40 28 39 8600 O0 8136.81 8049 84 29 19 8700 O0 8223.92 8136 95 29 29 8800.00 8310.96 8223 99 29 25 8900.00 8397.83 8310 86 30 2 S 53 43 E 1517 99 S 52 2 E 1564 S 50 32 E 1611 S 48 31 E 1658 S 47 6 E 1705 S 45 8 E 1753 S 43 20 E 1801 S 41 47 E 1850 S 39 43 E 1898 $ 35 53 E 1947 71 08 19 68 23 52 30 93 44 1 56 091 0 8O 0 64 0 96 1 48 1 30 2 57 0 94 071 861 16 S 1260.78 E 1526 82 S 55 40 E 889 918 949 980 1014 1049 1085 1122 1161 45 S 1298.06 E 1573 51 S 1334.23 E 1619 11 S 1370.05 E 1666 98 S 1405.28 E 1713 01 S 1439.60 E 1760 05 S 1473.18 E 1808 O0 S 1506.63 E 1856 40 S 1538.64 E 1904 52 S 1569.01 E 1952 56 S 55 35 E 82 S 55 27 E 69 S 55 17 E 81 S 55 5 E 87 S 54 50 E 53 S 54 33 E 65 S 54 14 E 52 S 53 53 E 16 S 53 29 E 9000.00 8484 30 8397.33 30 7 9100.00 8570 9200.00 8656 9300.00 8743 9400.00 8831 9500.00 8918 9600.00 9005 9700.00 9091 9800.00 9177 9841.00 9212 55 8483.58 30 51 97 8570.00 29 45 87 8656.90 29 27 03 8744.06 29 16 37 8831.40 29 8 60 8918.63 29 38 94 9004.97 31 5 58 9090.61 31 5 69 9125.72 31 5 S 34 48 E 1996.18 S 31 36 E 2044.89 S 31 24 E 2092.90 S 28 25 E 2139,44 S 25 53 E 2184,80 S 24 53 E 2229,15 S 26 23 E 2273,86 S 26 20 E 2320.24 S 26 20 E 2367,70 S 26 20 E 2387,16 0 59 18 14 0 96 1 01 1 44 0 26 1 31 0 O0 0 O0 0 O0 1202.39 S 1598.21 E 2000 01 S 53 3 E 1244.43 S 1626.37 E 2047 1287.04 S 1653.11 E 2095 1330.02 S 1677.60 E 2140 1373.63 S 1700.01 E 2185 1417.71 S 1720.68 E 2229 1461.78 S 1741.85 E 2273 1506.92 S 1764.28 E 2320 1553.20 S 1787.18 E 2367 1572.17 S 1796.57 E 2387 85 S 52 35 E 05 S 52 6 E 87 S 51 36 E 61 S 51 4 E 50 S 50 31 E 95 S 50 0 E 24 S 49 30 E 79 S 49 0 E 34 S 48 49 E COMPUTATION DATE: 15-AUG-91 PAGE BP EXPLORATION Y-34(23-34-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 25-JUL-1991 KELLY BUSHING ELEVATION: 86.97 FT ENGINEER: JOHNSON INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 0 O0 1000 2000 3000 4000 5000 6000 70O0 8000 9000 0.00 -86 97 O0 1000.00 913 O0 2000.00 1913 O0 3000.00 2913 O0 3999.98 3913 O0 4992.48 4905 O0 5890.75 5803 O0 6747.88 6660 O0 7608.29 7521 O0 8484.30 8397 0 0 N 0 0 E 03 0 0 N 22 57 E 1 03 0 14 S 0 48 E 1 03 0 19 S 26 40 W 2 01 0 26 S 14 57 W 3 51 15 36 S 39 18 E 82 78 32 8 S 60 10 E 508 91 31 18 S 60 6 E 1015 32 28 22 S 53 43 E 1517 33 30 7 S 34 48 E 1996 0 O0 13 01 12 78 61 16 40 99 18 0 O0 0 O0 0 20 0 O0 0 O0 2 5,4 0 20 0 11 1 56 0 59 0 O0 N 0 0 1 7 78 334 596 861 1202 0 O0 E 50 S 1 32 S 1 43 S 1 01 S 1 69 S 41 68 S 382 64 S 825 16 S 1260 39 S 1598 0 O0 N 0 0 E 05 E 1 06 E 1 56 E 2 02 W 7 43 E 88 44 E 508 76 E 1018 78 E 1526 21 E 2000 17 5 64 28 E 11 S 73 26 E 12 S 47 27 E 09 S 8 1,4 W 93 S 27 46 E 20 S 48 49 E 76 S 54 9 E 82 S 55 40 E 01 S 53 3 E 9841.00 9212.69 9125.72 31 5 S 26 20 E 2387.16 0.00 1572.17 S 1796.57 E 2387.34 S 48 49 E COMPUTATION DATE: 15-AUG-91 PAGE 5 BP EXPLORATION V-34(23-34-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 25-JUL-1991 KELLY BUSHING ELEVATION: 86.97 FT ENGINEER: JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUT~ DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 0.00 0.00 86.97 86.97 186.97 186.97 286.97 286.97 386.97 386.97 486.97 486.97 586.97 586.97 686.97 686.97 786,97 786.97 886.97 886.97 -86 97 000 100 O0 200 O0 300 O0 40O O0 500 O0 60000 700 O0 80000 0 0 N 0 0 E 0 4 S 87 11 E 0 11 S 62 52 E 0 10 S 7 14 E 0 10 S 71 14 E 0 6 S 1 43 E 0 8 S 68 44 E 0 4 N 37 59 E 0 1 S 82 40 E 0 6 N 25 43 E 0.00 0.00 0.01 0.00 0.29 0.00 0.61 0.00 0.72 0.32 0.96 0.00 1.03 0.09 1.11 o.30 1.17 0.14 1.12 0.00 0 O0 N 0 02 N 0 12 S 0 37 S 0 46 S 0 66 S 0 68 S 0 75 S 0 70 S 0 59 S 0.00 E 0.03 E 0 0.28 E 0 0.48 E 0 0.55 E 0 0.69 E 0 0.76 E 1 0.82 E 1 0.95 E 1 0.96 E 0 O0 N 0 0 E 04 N 59 20 E 30 S 67 11 E 61 S 52 0 E 72 S 50 6 E 96 S 46 21 E 03 S 48 11 E 11 S 47 31 E 18 S 53 26 E 13 S 58 13 E 986.97 1086.97 1086,97 1000 1186 97 1186.97 1100 1286 97 1286.97 1200 1386 97 1386.97 1300 1486 97 1486.97 1400 1586 97 1586.97 1500 1686 97 1686.97 1600 1786 97 1786.97 1700 1886 97 1886.97 1800 986.97 900 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 0 1 N 58 56 E 0 6 N 27 14 W 0 5 N 27 22 E 0 1 N 78 17 W 0 2 N 1 21W 0 3 N 20 28 E 0 3 N 2644 E 0 3 N 42 53 E 0 2 S 35 20 E 0 6 S 50 55 W 1 .12 1 .06 0.96 O.95 0.91 0.86 0.85 0.85 0.88 0.88 0 2O 0 O0 0 O0 0 O0 0 O0 0 O0 0 O0 0 O0 0 O0 0 O0 0 50 S 0 43 S 0 27 S 021 S 0 18 S 0 11 S 0 06 S 0 O0 S 0 02 N 0 08 S 1.05 E 1 02 E 1 03 E 1 07 E 1 04 E 1 04 E 1 07 E 1 12 E 1 17 E 1 10 E 1 16 S 64 22 E 1 11 S 67 2 E 10T S 75 14 E 1 09 S 78 43 E 1 06 S 80 21 E 1 04 S 83 58 E 1 07 S 86 48 E 1 12 S 89 49 E 1 17 N 88 48 E 1 10 S 85 58 E 1986 97 1986.97 1900 O0 2086 2186 97 2186 2286 97 2286 2386 97 2386 2486 97 2486 2586 97 2586 2686 97 2686 2786.97 2786 2886.97 2886 97 2086 97 2OOO 97 2100 97 22OO 97 2300 97 240O 97 2500 97 2600 97 2700 97 2800 O0 O0 O0 O0 O0 O0 O0 O0 O0 0 14 S 5 34 E 0 13 S 8 55 W 0 9 S 39 42 E 0 3 S 13 34 E 0 3 N 33 4 E 0 5 N 56 33 E 0 5 N 80 45 E 0 4 N 79 6 E 0 5 S 89 13 E 0 6 S 2 40 W 0.97 1 21 1 45 1 6O 1 61 1 62 1 70 79 1 88 1 99 0 19 0 O0 0 o2 0 O0 0 19 0 0 0 0 0 O0 O0 oo O0 O0 0 26 S 0 69 s 0 98 S 1 11 S 1 12 S 1 05 S 1 O0 S O 98 S 0.98 S 1.07 S 1 06 E 1 O0 E 1 08 E 1 16 E 1 16 E 1 24 E 1 38 E 1 52 E 1 64 E 1 71 E 1 09 S 76 5 E 22 S 55 34 E 45 S 47 49 E 60 S 46 8 E 62 S 46 3 E 62 S 49 48 E 70 S 53 59 E 81 S 57 7 E 91 S 59 8 E 01 S 57 57 E 2986.97 2986 97 2900 O0 3086.98 3086 3186.98 3186 3286.98 3286 3386.98 3386 3486.98 3486 3586.98 3586 3686.99 3686 3786.99 3786 3886.99 3886 97 3OOO O0 97 3100 O0 97 3200 O0 97 330O O0 97 34OO O0 97 3500 O0 .97 3600 O0 97 3700 O0 97 3800 O0 0 18 S 26 13 W 0 22 S 12 57 W 0 16 S 8 10 W 0 18 S 28 43 W 0 17 S 11 41 W 0 18 S 29 31 W 0 22 S 37 43 W 0 25 S 41 6 W 0 29 S 27 11 W 0 26 S 16 17 w 2 10 2 29 2 59 2 77 291 3 O5 3 10 3 12 3 19 3 40 0 O0 0 O7 0 09 0 O0 0 O8 0 O0 0 O0 0 O0 0 06 0 O0 1.37 S 1 .92 S 2,46 S 2.91 S 3.38 S 3.87 S 4.31 S 4.86 S 5.47 S 6.20 S 1 59 E 1 37 E 1 30 E 1 16 E 0 93 E 071 E 0 40 E 0 04 W 0 48 W 0 82 W 2 10 S 49 16 E 36 S 35 28 E 78 S 27 54 E 13 S 21 44 E 51 S 15 26 E 94 S 10 23 E 33 S 5 16 E 86 S 0 27 W 49 S 4 59 W 25 S 7 34 W BP EXPLORATION V-34(23-34-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA COMPUTATION DATE: 15-AUG-91 PAGE 6 DATE OF SURVEV: 25-JUL-1991 KELLV BUSHING ELEVATION: 86.97 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN ENGINEER: JOHNSON 3986.99 3986.97 3900.00 4087 O0 4086.97 4000 O0 4187 O0 4186.97 4100 O0 4287 01 4286.97 4200 O0 4387 02 4386.97 4300 O0 4487 06 4486,97 4400 4587 25 4586.97 4500 4687.84 4686.97 4600 4789.02 4786.97 4700 4891.08 4886.97 4800 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITV NORTH/SOUTH EAST/WEST DIST, AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 0 25 S 14 11 W 3.74 0 29 S 19 5 W 4.06 0 40 S 26 51 W 4.32 0 46 S 38 7 W 4.48 0 55 S 37 55 W 4.49 O0 2 6 S 11 39 E 5.97 O0 4 34 S 29 48 E 11.48 O0 7 38 S 33 32 E 21.78 O0 9 54 S 32 23 E 36.48 O0 12 54 S 37 2 E 56.15 81 08 110 29 143 93 182 55 225 90 272 97 32419 381 68 443 76 505 83 567 39 627 73 685 76 742 32 8OO 43 859 68 919 31 978 98 75 42 4994.28 4986 97 4900.00 15 29 5098.56 5086 5204.15 5186 5311.39 5286 5420.40 5386 5530.95 5486 5643.44 5586 5759.10 5686 5877..29 5786 5995.54 5886 S 39 7 E 97 5000.00 17 30 S 41 43 E 97 5100.00 19 55 S 44 21 E 97 5200,00 22 17 5 46 38 E 97 5300.00 24 34 S 50 54 E 97 5400.00 25 56 S 53 31 E 97 5500.00 28 42 S 56 40 E 97 5600.00 31 30 S 58 47 E 97 5700.00 32 25 5 59 38 E 97 5800.00 32 8 S 60 8 E 6113.54 5986 97 5900 O0 31 57 6230.85 6086 6346.87 6186 6462.11 6286 6578.16 6386 6694.85 6486 6811.75 6586 6928.71 6686 7045.74 6786 7162.71 6886 5 6O 3 E O0 31 2 S 59 25 E O0 29 54 S 58 33 E O0 3O 3 S 58 36 E O0 30 52 5 59 6 E O0 31 '10 S 59 27 E O0 31 12 S 59 41 E O0 31 19 S 59 57 E O0 31 16 S 60 3 E 1038 O0 31 18 5 60 0 E 1098 97 6000 97 6100 97 62OO 97 6300 97 6400 97 6500 97 6600 97 6700 97 6800 7279.76 6986.97 6900.00 31 20 7396.87 7086.97 7000.00 31 29 7513,94 7186.97 7100,00 31 3 7630.35 7286.97 7200,00 30 26 7746.05 7386,97 7300.00 30 7 7861,27 7486,97 7400.00 29 23 7975,74 7586,97 7500,00 28 39 B089,07 7686.97 7600.00 27 35 8201.95 7786.97 7700.00 27 54 8315.35 7886.97 7800.00 28 22 S 60 15 E 1158.21 S 60 9 E 1218.09 $ 59 22 E 1277.97 S 58 34 E 1336.75 S 57 42 E 1394.30 S 56 13 E 1451.01 $ 54 12 E 1506.44 5 52 13 E 1559.66 S 50 31 E 1611.99 S 48 22 E 1665.47 0.00 0.00 0.00 0.47 0.6O 2.18 3,76 2.05 3.12 2.78 6925 7 66 S 8645 9645 10 79 S 13 31 S 18 73 S 27 82 S 4O 82 S 57 42 S 0 99 w 1 20 w 1 70 w 2 34 w 3 32 w 3 5i w 0 90 v,' 4 89 E 13 11 E 24 80 E 6.99 S 8 9 W 7 76 S 8 55 W 8 9 11 13 18 28 42 62 81 S 11 8 w 92 S 13 40 W 29 S 17 6 W 76 S 14 48 W 75 S 2 45 W 24 S 9 58 E 87 S 17 48 E 54 S 23 22 E 2 77 2 5O 2 67 2 33 2 12 2 07 2.83 2.62 0.73 0.25 77 49 S 99 124 151 180 2O9 238 269 301 333 40 44 E 99 S 59 67 S 82 84 S 110 45 $ 142 29 S 180 68 S 222 69 S 271 82 S 325 50 S 380 87.41 S 27 34 E 65 E 116.43 S 30 49 E 81 E 149.66 S 33 36 E 38 E 187.72 S 36 1 E 97 E 230.22 S 38 23 E 23 E 276.20 S 40 44 E 49 E 326.30 S 42 59 E 60 E 382.75 S 45 12 E 80 E 444.12 S 47 11 E 38 E 505.88 S 48 45 E 0 26 0 89 1 07 0 83 0 51 0 26 0 20 0 O0 0 03 021 364 67 S 434 72 E 567 42 S 50 0 E 395 425 455 486 516 547 578 608 638 52 S 487 88 S 538 78 S 586 28 S 637 96 S 689 64 S 741 14 S 793 49 S 846 84 S 898 71 E 627 10 E 686 94 E 743 31 E 801 03 E 861 25 E 921 67 E 981 34 E 1042 89 E 1102 93 S 50 58 E 24 S 51 38 E 12 S 52 lO E S 52 39 E 40 S 53 7 E 61 S 53 33 E 91 S 53 56 E 38 S 54 17 E 78 S 54 36 E 010 0 57 0 75 1 07 0 84 1 03 1 57 0 89 0 78 0 56 669 16 S 951 63 E 1163 34 S 54 53 E 699 729 760 791 822 854 886 919 953 42 S 1004 99 S 1057 70 S 1108 42 S 1157 53 S 1205 34 S 1251 34 S 1294 09 S 1334 93 S 1375 54 E 1224 17 E 1284 25 E 1344 68 E 1402 70 E 1459 43 E 1515 08 E 1568 93 E 1620 51 E 1673 05 S 55 9 E 72 S 55 22 E 20 S 55 32 E 35 S 55 39 E 54 S 55 42 E 24 S 55 41 E 52 S 55 36 E 73 S 55 27 E 92 S 55 15 E COMPUTATION DATE: 15-AUG-91 PAGE 7 BP EXPLORATION Y-34(23-34-11-13) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 25-JUL-1991 KELLY BUSHING ELEVATION: 86.97 FT ENGINEER: JOHNSON INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 8429.00 7986.97 7900 O0 28 22 8542.91 8086 8657.57 8186 8772.45 8286 8887.47 8386 9003.09 8486 9119.08 8586 9234.55 8686 9349.47 8786 9464.05 8886 97 8000 97 8100 97 8200 97 8300 97 8400 97 8500 97 8600 97 8700 97 8800 O0 29 1 O0 29 26 O0 29 28 O0 29 57 O0 30 8 O0 3O 14 O0 29 44 O0 29 22 O0 29 6 S 46 30 E 1719 44 S 43 33 E 1773 S 43 5 E 1829 S 40 10 E 1885 S 36 11E 1941 S 34 46 E 1997 S 32 53 E 2054 S 30 10 E 2109 S 27 14 E 2162 S 24 51 E 2213 84 59 58 34 68 16 14 01 25 1 .10 2.76 1.12 0.86 1 .58 0.66 1 . 64 3.18 1 .28 0.35 990 41 S 1415 32 E 1727 44 S 55 1 E 1028 1069 1112 1156 1203 1252 1301 1351 1401 80 S 1454 64 S 1492 02 S 1529 48 S 1565 66 S 1599 67 S 1631 74 S 1661 49 S 1688 84 S 1713 07 E 1781 52 E 1836 94 E 1891 31 E 1946 10 E 2001 52 E 2056 90 E 2111 95 E 2163 33 E 2213 22 S 54 43 E 23 S 54 22 E 38 S 53 59 E 19 S 53 33 E 48 S 53 2 E 95 S 52 29 E 03 S 51 56 E 12 S 51 2O E 75 S 50 43 E 9578.59 8986.97 8900.00 29 24 9694.19 9086.97 9000.00 30 59 9810.96 9186.97 9100.00 31 5 9841.00 9212.69 9125.72 31 5 S 26 9 E 2264.17 S 26 22 E 2317,50 S 26 20 E 2372.91 $ 26 20 E 2387.16 1 .26 2.73 0.00 0.00 1452.32 S 1737,19 E 2264.30 S 50 6 E 1504.27 S 1762.94 E 2317.50 S 49 32 E 1558.27 S 1789.69 E 2373.01 S 48 57 E 1572.17 S 1796,57 E 2387.34 S 48 49 E DIRECTIONAL SURVEY COMPANY BP EXPLORATION FIELD PRUDHOE BAY WU. COUNTRY USA ONE r~A'm u:x~o 25 - JUL - 91 D~PTH UNIT FEET ~ ~ubJe¢~ I~ o~r General Terms ~t0 Gon411~m ~, .~t ou~ I~ o~r m~'re~ prl¢~ WELL: Y-34 (23-34-11-13) ~ (1257' FNL, 512' FWL, SEC 34, 111N, R13E) 40RIZONTAL PROJECTION 15OO IOO0 -..~--.h~~---: ...... ~.-.i.--~---~ ...... ~'-'i---~---~ ....... i---i---.:-.-~-..',--i'--?--~--'i ..... ~.--.:--.i...i --.--.-~---i-*h--:-.-i---.:---~---~ ...... ~---.:--.:---~-.-~.--:---i---~--.i ...... ~---~.--i---~ ...... h-i---:--.~ ...... ¥..i,.-:.-'~ ...... :..-~ ....... .' ..... i-'m-m-~ ...... i-'h-:-'~ - ~ : : : : : : : : : : : : : : : : : : : : : : : ~ i : : : ~ : : : : : : : : ' : : : : , : : : : : : : ; ' : : : : : : : : : : : : : : : :::i:::i:::!:::i::: ::i:::i:::i:::i::: :::i:::i:::i:::i:::!:::i:::i:::i:::i::: :::!:::i:::i:::i::: :::::::::::::::::::::::::::::::::::: :::i::i:::i:::i::: :::i:::!:::i:::i::?:::!:::?:i:::i::: :::i:::!:::!:::i::: :::i:::!:::i:::i'" :::i:::i:::i:::!::: :::!:::i:::E::: ::i:::::::% : : : :: : : : : : : : : : : : .......................... : : : : , ! ! i ! : ! : ! i i ! i : ! : ! ! ' · -.:..-:.--;---: ..... :---~---:...: ...... :---~---~---: ....... :---~---:--.: ..... ~.--h--~.-.~ ..... i'--h--i-'-½ ..... ~---h-.~-.~ ..... ~'"~'"i---~ ..... :-..~---h-..: ..... ~.--h--h--~ ...... h'-i ....... ~ ..... :-':"'~'": ...... r...:...~-,-:..-, ...:...:..'r.-.: ..... ~-'m.r-o: ..... :---m.: : : : : : : : :: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : ' : : ' : : : : : : : : : : : t ---:---t---:---: ...... :---~---~---~ "':"-:'-'~"-.' ...... :'":'--:'-'~ ....... :'":'"~'": ...... :"':"':'": ..... :'":'":'": ..... :'":"':--': ..... :'":'-':'-'t ..... :"'~"'~'"~ ..... :"':'":'": ..... :"':---:'": '":'":"':"'~ ..... ."--:'":'-': ..... :-':-':-'~ ......... r ....... · , . -'i"'!'"i'"! ...... i'"~'"i'"! ...... i'"!'-'i'"i ...... i'-'!-"i-"i ...... !'--r--!---i--','--!---i---i---i ..... i'--!---!--'~ ..... i---i---i--i ..... i-'-i'--i--! ..... !-'-i'--i"-i ..... !-"!"-i'--! ..... i"'i'-'!'"i ..... ~---!'"i''-~ ...... mi-"i'"i ...... i-.i.-i.-~ ...... · "!"'i'-~'"! ..... !'"i'"~'"i ...... !'"!'"~-"i ...... i'"!"'i-"i ...... !'"~'"i'"!'", ~"i"'i'"i"'! ..... i"'!"'h"i ...... i'"i"'!'"i ..... !'"i"'i"'i ..... !"'i"'!'"! ..... !'"i"'i"'i ..... !"'i'"!'"! ..... i"!'"~'"! ....... !'"~'"!'"! ...... i-'!-i-'~ -i'-i ....... ~ :.'; :!:: ::::::::::::::::::::::::::::::::::::: :::E::EEi;I~;:;E;E:E:::::!;;;E~::;E,::;EE:iT.:i;;i :::::::::::::::::::::::::::::::::::::::: i::?"::;E:E:i~;:E :::::::::::::::::::::::::::::::: :::i:::!:::EE :::;::E;::;:;i ::;:i:i!ii:iii:i::i '--'. i!! ~ ~!: ~ ...i...i...i...i~.i ...... L..L.....~ ......... i ............ : ....... i...i...::...i ....... i...i...L..::...~...i...::...i...i..,i...i...i...!...! ...... i...i...:....i ....... i..J...i...! ...... L..~...i .......... :...~...:...: ...... i...L..:...L. "'!'"i'"F'~ ..... F'i"T"i ...... i'"i"'F'i i ~ i : ~ ~ : : : ~ ~ : : ~ : i ! ~ , ~ i ! i ~ : ~ : :i: :: ! .... i-.-i---!...i ...... !.-.?--.! ...... }---i---h! ...... i...i-..i--i ...... ~i-.-ki ...... !..-i---!---i ...... !-.-!---i.--; ...i.-.i..-i..-i .-.i-.-;.-i..-i ...... !--.hi---i ...... i---i-.-}.-.i ...i...!--.i-..} ...... hi-..i...i ........... i ...... · --i-"--hi--- .................... i---i--.i ...... i.--i--.i---i ..... }.--i---!---i-.-i.--i-.-i-..i ...... !-;.i-~-.-~-.-i---i---i ...... i--.i---i---! ...... i.-.i---i..-i ...... !--~-.-i---i ...... !---i-.-i--.i ...... i...i.-.i..-i ...... i.--!--.!-.-;---,...i..-i ............. . ! ~ ~ ~ % L.L.J ..... i .... i . i _ '...~_.i...:~.. .... ::...L..::...i.. i...i...L..; .................... :J:::i::i::J:: ::::::::::::::::::::::::::::::::::::::::::i::i:::i:::~::::::~::i:::~:::i::::::i:::i:::!:::i::::!::i:::i::i::::::~:::i:::i:::~::::::i:::i:::i:::i::::::i:::i:::i:::!::: ~:::;:i::: ;:: ::: ::: ::: ::::::i:::;:: :::!::?;::;:::i:: :::i:::;:::i:::i::: --i.--!--}--.i ..... i---~.-¢--.i '.--i.-4..-}--4 ...... }--¢---i.-~--.."--.} .... i---~--~--~----¢.-i..-¢-i ...... ~--!---i---i ..... }--.~-4...i ...... i-"i"-}-"! ...... ~-~-!-~---}---!'"i'"!'--:-'-!--':'--'}"'i ..... }.--i.-.i.--i ..... i"'}'-'}"-! ....... i ( i i ~ ~ !.! i._L..i..~ ..... ::._L..i...( ...... L..i..J...i ...... !...!...L..~ ..... L..L..L..i ...... L..L..L..! ...... !...::...::...! :...!...::...!...i ..... L..L..L..~...'...i...i...:...i ...... ~...i...L..; ..... !...L..; ...... i ....... ~...i...i · -i..-i--+-i ...... i-.i--4-, -.i-- ,--i..'.4;.--i.-4. ...... p..i.-4-- ' ........ ~ ......... i ...... ?'!'" 'd'"i ........... fi" '"i .......................... i'"!"'! ..... !'"i"'i'"~ ..... .""'¢'".-"~f ..... F"!'"!"'i ..... ?"F"!"'." ....... F"~ ...... : ................. ..'"....L_L..i_, i_."...L..L..:-....~._L..L..:. ..... :._~..i...:. ...:...:...:...:....,~'...:...L..: ..... ~-.-~--:---i ..... .'----i.--.:.--~--I ,--~---~---i....: ...... ~--.,:---i..-i ..... ~--.½.--i.,.i--,--i..-i---i.--~ ..... ~-.i-..i.,-i ..... !...!...i-...: ....... i,..~-..~...: ...... ~.--:.,-:--,:-- ~-~--i---kl-i--.i---i---i."--..~-5--¢--.i .... }-i.- : i ( i :i J i ~ 5 i::!::i:: ::i:::i:::i::J::: :::i:::i::J::J:: :::i:::i::i:::i::: :::i:::i:::i:::i::: :::i:::i:::i::i::: :::::::::::::::::::::::::::::::::::::::::::::: ::: :::... ::: ::: ::: ::: :: ::::::::::::::: ::::::::::::::: ::i iii i!iii i 5i! ii i i i:i :::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: WELL: Y-34 (23-34-11-13) (1257' FNL, 512' FVVL, SEC 34, T11N, R13E) VERTICAL PROJECTION 2000 '-!--!---!---!---!'--!---!---!? ...... ..:.'---!---!---! ...... !---!--'!---!---;--i--;~-----?!'--~ ...... ?--?--~ ...... ?-?--i---~ ...... i---i.-?--i ....... i---i..-i---i ...... i..-i.--!.--i--.?--.:-.-i..-i---i ....... ::::::::::::::::::: ::::: :' :i: i::: :: ~::i:::i: ':: :i ' ' '::i ': ...... i ' ::~ ':' ! :i:::::'--"'--i-'-i ....... h?i.--i ...... i-.-i...!-.-i.-.:.--h?-.:.-.i...i.-.i.--! ...... i..-'...'-.-i., i-.'...; ....... i.--~...i-..7 ...i...!...!...L..l...i...!...L.~ ...... L..L.~...i ...... ::...i...~..i ..... ~ i. [ ~ i ii [ !. ~; ~ ~! i! ~"'.-'"'!'"i ...... F'!'"!'"i ..... F'!'"F'i ....... !'"!' ~"'! ....... F'i'"F"i ...... ."'"?"'! ...... ~'"?"!'?'1'"..""!' 'i"':-'- '"?"??! ..... i'"hl-'~ ...... i'-i'"?"i ...... i"'i"'!'"~ ...... ~ ...... ?"!"i"i ...... i"'i'"!'"! ...... ?'i"'i ...... ~-"!'"? ...... !-.-i..-i--.i...-~-..~.--i-..i ...... i-.-!-.-!.-.! ...... ~..-:,.--i.-.~ ...... i-..~...i-.-~ "'~'"!'"!"i ..... i'-'~'--! ....... ...i.-.i...i.--! ..... i.-.i..-i-.i ..... i...i.-.i...i ...... i...~---;...i-..'-..i.-.;-.i...i ...... i...i...i...~ ...... ~..-i...i-i ...... L.!...L." ...... i...L.i...i ...... i...i._L.: ..... L.L.i...i ...... ':...L.i...i ...... i...:,...~...~ ..... i. "!'"!'"i'"i'"?!"'i-'~ ...... !.--h!--.i ..... i.--i.--i...!--:--i-~---.--!---~--i---! ...... !--~...i---! ...... !-.i...i.--! ...... i...i..-i---i .-.i.--i...i.--!--.-i-..!---i..! ...... !..-!...i.-.i ...... i-.-i...!-.-! ...... '--!"-?"i"'! ...... h'i"'!-'?,"'i'"i'"i'"! ...... ?'?'"i" :"~' '"!'"!"'??i'"?"?!-i ...... ?!--'!---i.--i--.!---!-.-!---i .... !-..!-.-;~..!--.-+--~--~---! ...... i---!...!.--! ...... !-.-i-..i---i ...... i...!.-.!..-! ..... ...L.L..[...i ...... L.L.i...i...i...L..L..L..i ...... i...i...i...=,.. :..L..L.L..~ ..... L.L.!...i ..... L..!...i...L..,...L.L.!...i ..... L..i...L..i ..... L..i...L..:, .... · ..i...i...;...i ...... ;.--i.-.i...i......i.-.i..-i.-.i--.,..-i.-.i-..;-.-i ...... L-;...i-.-i ..... ;...i...i.-.~ ..... ;...L.i...i..~...L.L.i...i ..... L.L.',...i .... i...L.i...':... : ~ . " [2 ;2 ~:;[ ~ ..'" "i-'~ ..... ~ ..... ~'"i'"!'"~ ..... F'F'F'~ .... !"'F'F'~"i ............ ~ ...... F'~'"~ ............ ~ ............................. ~"'~" ~!~ ~!i i i~ !~ ,~ ir, n~ ~ i i~ i i~' "F'!"'!'"~ ..... F'F'F'! ..... !'"F".."'"f ...... !'"F'"..""f'"i'"F'F'%'[ ..... !'"F'f'"~ .... F'F"F"~ ..... i'"F"F"; ...... ?'"'"~"'i'" --iq--.!-.-i ...... i---!---i-.i ...... i---i--.!---i ...... }---}~-i ....... hi--hi ...... }---}.--i---! ...... i-~d3.-} ................ i ......... i ............ :::i::~::i:::i::: :::i:::i:::i::i::: :::¢:::i:::i:::i::: :::i::)~:!:: :::i:::i::i:::i::: ::::i:::i:::i:::i::: ::::i:::i:::i::i::: ~ ::::!::~: ::::i::: :::~::i::: ::: ::: ...... ! ..... ! ...... !'"~ .............. i"'~ ......... F' ~ '!"i'"~"'?'~ ...... ?"?'i'"i ....... ?'i'"! ....... ?'?"?"~"'~ ...... !'"!'"?'! ..... i'"i'"!-"i ...... ??"i'"i ...... i! ! !i:i::: :::i:::i:::i:::i:: :: i:::i: :!: ¢::: :::i:::i::i:::i::: :::i:::i:::!:::i::: :::!:::i:::i:::i::: ::::¢::i:::!:::i::: :::!:::i:::¢::: ::: = ; ~ = : = ; = ; : : = : :~: : : ; : : : : : : : : : = : : = : : : : : = : ~ : : : - . : ; : : : : : : : : : : · : : : : · : ..i...i...i-..i ........ i ...... i ..... i...~ ...... i ...... i...i~-i.: .. ....... i.-.i ......... ; ............ i ......... i ...... i...i...i .................... 1 ........................ .................... i ...... i .............. i--.--i.--~:--.~:: ...... ~...i...i...i ...... i---:--..i...~ ...... :....i...~...~ ...... ~...!...~...':..-1...L..L..~...i ..... L..i...:....i. I_ .: ......... i ...... : ......... i ........... ~---i---~ ........ I,,~ ..... i---i ...... i ...... i--- --4---~ ...... i.-.i ...... ~ ...... ;~.L..L.i ..... i...i...i...i ..... i...:....i...i.. ~.L..i...~...i ..... ii i ~ ! i .." ~~_ ~,~m ; 'f'.: f'f ..... ?"? ..... F'¢'";'"~ ........ ;'"?"! ..... F"?r"'f ..... ['"i"'i"'~ ...... ?":"'r"'.."" --!-'-i---i---i ...... i---}---i---i ....... i---}---i'--;--,'-i-'-h}'--! ..... i---hi"'! ..... hi---i'--! ..... h!"-i--! ..... !--i---!---! ..... hhi---i--','--i'--h!..-! ...... : : : ~ : : : : : : : : I : : : : : : ~ : : : : : ," : : : : : : : : : : : : : : : : . ; : : ~ : : : : : ~ : , : : · : :: : - : .... : : : : : : : : : : : : i : : : · , ~ : : : ; : : ......... '-"~"'."'":'-'! ...... F"F".-'" i ....... F '".'"'~'"-" ...... .-'" ':'" '? '.: ..... ~ '"." "'~" ".' ...... ."'"~"'!"':' ..... ~ - '..'"'.."-~ ..... !- '?'..'"'~ ...... F":'"'.:'"F" r.--:.--:--.:-.-:-.. :---:.--:---:---: ~"'!'"Y"~ ...... F"?!'"!'" :'"!'"!"?"[ '"!'"!"!"! ..... !!!! !'!!i ....... ?"?"!"'! ...... ...... ........ ~...; ..... L..: ...... ; ...... L..~...i...~ ...... L..!...i...; ..... ';...i~.i...! ..... L..i...i...L.. i...L..i...L_L., i...~_.L..;...: ...... i...i...;...i ...... !...L..';...:. ...... L..i...:...i... ' ............... ............................... · "?"!'"i ...... :'-F';'"i ...... ~"'!'"i"'i "?'!'"i .... ?"?7' .~ i : ; : ; ; ; ; ; ; ; ; : : ; : : ." ." : ; ; ; , ; ; : : ; : : : i ; : : : : : : ' ' --.i.--~.-.i.--~ ..... i-~!---}--! ...... i.-4--.}--.~ ...... i---}---}---; ..... ~---i--i---} ...... i---[.-,4---i--. ,-.4.-.i.-.i-~i ...... }---i--.i.--i ...... i---i--.[---} ...... i..-~-~i.-.i ...... ~.--[ ....... ........................................ : : ~ : ......................................................::::::: ~ : :: : ;...L..L..~ ..... !...~_.L..i ...... i...L.:'...-:......~_.L..i..L....~~.L..L.~ ...... ~...L_i...~ ..... !...L_L..i... ' : : : : : : : ~ ~ : ~ : : : : : : : : : : ~ : : : : : : : : : : : : : : : : ; : ; "'!'"'.'"'!'"~"' : : '. : '"Y-?"!'"~ ...... ?'!"'."'"! ...... ~'"?'.""'~ .... !'"F".""'."" ,..:...;...:~-. ..... :...:...:-.:. ...... :...:...:...: ...... ~...:.,.:...~ -.:...:...~ -......~ --.,- ..:...:...~ ...... :..~- ..~..: ..... ;...~...:...: ..... :...:~.~...: ..... :...:...:.,... ...... ~_.:..-.._: ..... :...:...:...: ...... :.......:...: ...... :,..:...~...: ..... :,..:...:.,.~ ...... :...:...:...: ...... :...:,..:...: ...... ;...:,..:...: .... :..,~...:._~ : : : : : : : : : : : : : : : : : : : ~ : : ~ ; : : : ~ : : : : : : : : : : : ; : : : : : : : : : ; : : : : ; : : : : : : : : : -!"~":--'~ .... ."".,""T-".' ...... ?..-"?"~ ..... :"'?"':'"'? ..... ."'":'"'F'".' "'.'"'!"?'"."'" "?"',~'".:'-~" '"-'~'":'":'" "~"'"'"~'": ...... :"'~'-:'":'" -':'":'"~'": ...... ~"'~'":'": ...... :'-:'-:'": ...... :'","":"': ..... ~'":'"~ .......... ............................ : : : : : : : : : : : : ~ : : : : : : : ~ : : : : : : : : : : . : : : : : : : : : : : : : : : : : : : - : , ~ : : : : : : : : : ~ : : : : t : : ; : , : : : : : : : : : : ~ : : : r : ~ : : : ; : : : : - . : ; : ! i ~ : : ~ i ; : : ; : ; : : ............................................... : : : : : : : : ; : : ; : : : : : ~ ~ ! ! i i i .; i ! .: ! ! ~ ! ~ ~ ~ ~ ~ ! ! i i ~ ii:: : : : : ' : : : : : : ; : : : : ' : ' ; check off ,r list data as it is received.*list received date for 407. if not requirc,~ Ii'St as N~ cored in(e~a~ core analysis~. ' d~ ditch intc~als d~ital data LOG TYPE RUN INTERVALS SCALE' ,, NO. (to thc nearest footi , [inchll00'] i i i iiiii i J 9) ~~ ,,, ~ ~~-qT~ Il ._ AOGCC GEOLOGICAL MATERIALS INVENTORY LIST PERMIT # ~/ - ?~'/ WELL NAME /O~ ¢,' ~'- COMPLETION DATE ? / ..~ ~2'/ ~// CO. CONTACT & NO. form received received d~te ' comments 403 yes no sunfl~ application 404 yes no report of sund~ application Open ..... 'r~'~:~i~-~i- -'~-~i'-' ~q'~'i~e~'' ~e-ceived' Hro~'~i~-~ ~i~'-'r~Wd hole !o9 hole Io~ Io~ . 'DIWSFL CNL PnOD ' /- ~/ DLL Cu I' ./ / PHEsS' BHC/SL CET /. _ / SPINNER -- .... ~ , ~ ~ , ........ ,, SSS PACKER Digital Data FDc- Well CNL ~/~ ~ ~ Te~l~ _. FDC RwD ' rCqui~cd- ~cC~i~d SAMPLES ~cqui~ed ~eccivcd MWD LD~/CNL "' d~ ditch /~ ML core CYBE~ core LOOK Analysis FMS " ~ ~ '' NGT ' , , ,, ........ BP EXPLORATION BP ExploratIon (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date:09/05/91 TEL82790 FROM: Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINAL:~ Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. Y-13.. GAS LIFT A-26~ LEAK-DET B-26~ PROD-F ~/.~"[ ~--P-03.. GR/CCL/TAG B-28. PROD-F H-06- PROD-F 0~, \.~ ~ i,,~-Y-34-PROD-F H-17" PROD-F 08/16/91 #1 08/15/91 #1 08/15/91 #1 08/15/91 #1 08/13/91 #1 08/14/91 #1 · 08/15/91 #1 08/13/91 #1 300-10520 000-10160 10850-11250 9870-10375 11100-11250 9450-~)660 9450-~)720 10300-10742 CAMCO 2" CAMCO 2/5 CAMCO 5" CAMCO 5" CAMCO 5" CAMCO 5" CAMCO 5" CAMCO 5" Distribution: ARCO .CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES -. .. RECEiV£r. · SE'.P l ! 1991 Alaska Oil & Gas Co[~s. Uouml/~..,: Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 08/07/91 T#:82718 FROM' SUBJECT: Information Control Well Records LR2-1 BP ~A~ED H~)LE FINAL,~ Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. /'-Y-28 --. /~ Y-28-- ('Y-34'"- r--fl LvV-34- Y-34 ~ COMPLETION 07/29/91 #1 13480-14436 SCH 5" PERF - 07/27/91 #1 12070-12464 SCH 5" CBT 07/26/91 #1 8700-9456 SCH 5" CET 07/26/91 #1 8700-9479 SCH 5" COMPLETION 07/28/91 #1 8750-9452 SCH 5" CET 07/25/91 #1 9000-9742 SCH 5" CBT - 07/25/91 #1 9000-9717 SCH 5" COMPLETION 07/27/91 #1 9050-9712 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 08/07/91 T#:82719 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINAL~ Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. PERF 08/02/91 #2 9100-9697 SCH PERF 08/03/91 #1 10700-11 299 SCH ,, Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED AUG 1 2 1991 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE :07/11/91 EXXON T#: 82622 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM TaDe & Transmittal Only BP MAGNETIC Ll,,q TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445.' CASED HOLE: CNTD/FIN 05/21/91 #1 10295-11126 SC H#74607 1600B PI A P 1#50- 029-21571 h-14 CNL/FIN 06/06/91 #- 9900-10800 ATLAS# 1600BPI AP1#50-029-20580 Q-07 CNTD/FIN 06/01/91 #5 SCH#74606 1600BPI OPEN HOLE: Y-34 DIFL/BHC/CN/AC 06/13/91 ATLAS#76923 1600BPI 10986-12170.5 AP1#50-029-20352 #1-3 9320-9865 AP!#50-029-22178 TAPE POA.#07843 TAPE POS.#07844 TAPE POS.#07845 TAPE POS#07846 Information Control Well Records LR 2-1 J. Dietz ALASKA OiL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 May 31, 1991 Bill Kirton PBU Lead Engineer BP Exploration (Alaska) Inc. P. O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit Y-34 BP Exploration (Alaska) Inc. Permit No. 91-74 Sur. Loc. 1257'SNL, 4766'WEL, Sec. 34, TllN, R13E, UM Btmhole Loc. 2755'SNL, 3001'WEL, Sec. 34, TllN, R13E UM Dear Mr. Kirton: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of. those BOPE tests that it wishes to witness. David W. Joh~'~on~ Chairman Alaska Oil and Conservation Commission BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] RedrillF'lllb. Type of well. Exploratory[] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2, Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP ExMoration KBE = 88' feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 282~7 4. Location of well at surf-ace 7. Unit or property Name !11. Type Bond(see 20 AAc 25.025) 1257' SNL, 4766' WEL, SEC. 34, T11N, R13E Prudhoe Bay Unit At top of productive interval · 8. Well number Number 2677,SNL, 3093' WEL, SEC. 34, T11N, R13E Y-34 (23-34-11-13) 2S100302630-277 At total depth 9. Approximate spud date Amount 2755'SNL, 3001' WEL, SEC. 34, T11N, R13E June 3, 1991 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and rVD) p rope~/L line 47471 @ 2523' feet Y-03 @ 3132'/30' feet 2560 9800'MD/9219'TVDfeet 16, To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 25,035 (e)(2)) Kickoff depth 4soo'feet Maximum hole angle29.3e o Maximum surface 3330 pslg At total depth (TVD) 8800'/4390 pslg 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 20" Cond. 80' Surface 110' 110' 13-1/2" 10-3/4" 45# L-80 Butt 2650' Surface 2680' 2680' :2924 cu fl Coldset III & II 9-7/8" 7-5/8" 29. 7# L-80 NSCC 9335' Surface 9365' 8840' 1328 cu ft Class G 6-3/4" 5-1/2" 17# ,.¢~.so FL4S 685' 9115' 8622' 9800' 9219' 155 cu ft Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth' measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor , ~ . Surface . Intermediate Production ~.' Liner: '" I~ "~ ~'''' ' Perforation depth: measured , :20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certifying is tru~ and correct to the best of my knowledge Signed~' *~\~ ~'~,,,- Title PBULoadEnginoor ~,1~ Date ' - ~1 - Commission Use Only J '' ' Permit Number IAPI number IApproval date JSee cover letter '~?-- 7¢ 15°' ~ ¢ - ~--~-/?~ 'l ,,O'~/~'/' Ifor other requirements Conditions of approval Samples required [] Yes No Mud Icg're uifed ~' q ' I-i Yes-~ NO Hydrogen sulfide measures [] Yes/~_ No Directional survey requ~recl ~' Yes [] Required workingp__~ssure]~r=B~2M; 1-13M; J~5M; r-I10M; I-I15M; Othe.~""-~'%~ ~ ...... by order of A P P rov e-'i::l~bY-~,..~~ ~---~~ Commissioner tne commission Date~ Form 10-401 Rev. 12-1 Submit in tri[ AFE No. 125446 PROPOSED DRILLING AND COMPLETION WELL Y-;3~, [23-34-11-13] PBI, I PROGRAM Install and cement 80' of 20" conductor to surface. The Drilling fluid program will consist of an 8.5-9.5 ppg spud mud in the 13-1/2" hole, a 9-9.8 ppg water base mud in the 9-7/8" hole and a 8.9 ppg water base mud in the 6-3/4" hole. Drill 13-1/2" hole to 2700' MD and cement 10-3/4" 45# L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 9-7/8" hole to the 7-5/8" casing point at the top of Sag River formation. Run 7-5/8" 29.7# L-80 NSCC casing to within 10' of 9-7/8" TD and cement with Class G cement around the 7-5/8" shoe. The annulus will be freeze protected by dry crude. Directional drill 6-3/4" hole to TD. Run 5-1/2" Chrome liner from TD to 250' inside 7-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" landing collar. Change over to NaCL completion fluid. Test casing and lap to 3000 psi. Run 7-5/8" production packer on chrome tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. -The well will be perforated after rig release. Fluids incidental to the drilling of a well will be pumped down the 7-5/8" x 10-3/4" annulus of the well. Tubing Size: Tailpipe Size: 4-1/2", 12.6# 13Cr-80, TDS R-3 TBG with GLM's. 4-1/2" TAILPIPE RIS 5/23/91 20" Conductor PF~".IMINARY WELL PLAN WELL Y-34 [23-34-11-13] PBU PROPOSED DEPTH BKB 110' Ball Valve 2100' 10-3/4" Casing Shoe 13-1/2" Open Hole 2680' 27OO' 4-1/2" 12.6# 13Cr-80 TDS tubing with GLM's 7-5/8" Packer 9065' 5-1/2" Tieback Assembly 9115' 7-5/8" Shoe 9-7/8" Open Hole 5-1/2" 17# 13 Cr FL4S Liner 5-1/2" PBTD 5-1/2" Liner Shoe 6-3/4" Open Hole 9720' 9800' 9800' RIS 5/23/91 PRELIMINARY WELL PLAN Well: Y-34 [23-34-11-13] PBU AFE NUMBER: 125446 LOCATION: Surface: Target:. T,D,: 1257' SNL, 4766' WEL, Sec. 34, T11 N, R13E 2677' SNL, 3093' WEL, Sec. 34, T11 N, R13E 2755' SNL, 3001' WEL, Sec. 34, T11 N, R13E ESTIMATED START: June 3rd 1991 OPR. DAYS TO COMPLETE: 21 CONTRACTOR: Alaska United #3 MAX ANGLE/SECT COURSE/KOP/BUILD RATE: 29.38°/S49.8°E/4500/2.5 item TVDs$ MD(BKB) Mud Wt. 20" CONDUCTOR 10-3/4" SHOE BASE WEST SAK FORMATION IKRU-PBU 7-5/8" SHOE TOP SAG RIVER SANDSTONE TOP SADLEROCHIT TARGET TOTAL DEPTH 110 8.5 2592 2680 9.5 578O 5955 9.0 7560 7998 9.8 8752 9365 9.8 876O 9375 9.8 8863 9493 8.9 8916 9554 8.9 9131 980O 8.9 LOGGING PROGRAM: Open Hole - Record all logs on magnetic tape where applicable. 9-7/8" Hole: NONE 6-3/4" Hole: DIL/GR/BHC/CNL/SP. Cased Hole CBT/CET and Gyro after rig release, Perforate after rig release, RIS 5/23/91 1' = 5280' 0 1 2 3 (M~LES) No. Y-34 LAT. = 70'16'05.096" N LONG. = 148'49'29.275' W y = 5,949,008.36 A.S.P. X = 645,324.68 ZONE 4 1,257' FROM NORTH LINE 512' FROM WEST LINE PADY34 SURVEYOR'S CERTIFICATE I hereby certify that I am property registered and licensed to practice m land surveying in the State of Alaska, and that this plat represents a survey made by me or under my supervision, and that all dimensions and other details are correct. Date FEB. 06, 1991 LS No. 7335 --/ Regist~'ed Land ~urveyor WELL PAD "Y' WELL No. Y-54 ASBUILT LOCATED IN PROTRACTED SECTION 34, TOWNSHIP 11 NORTH, RANGE 15 EAST. UMIAT MEREDIAN, ALASKA B.P. EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 SUR~-YED BY: ARCTIC SLOPE CONSULTING GROUP 301 DANNER STREET ANCHORAGE, ALASKA 99518 DRAWN BY: KMC J DATE~ 2/06/91 29 28 32 33 SECTION 55 32 ,.5'-3 $ 4 T11N T1 ON 28 L 27 53 34 %dj NO SCALE 27 26 34 35 SECTION 34 34 35 3 2 PADY34X WELL PAD "7" WELL No. Y-34 LOCATED IN PROTRACTED SECTION 5~-, TOWNSHIP 11 NORTH, RANGE 13 EAST, UMIAT MEREDIAN, ALASKA SURVEYED FOR: B.P. EXPLORATION P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 SURVEYED BY: ARCTIC SLOPE CONSULTING OROUP 301 DANNER STREET ANCHORAGE, ALASKA 99518 DRAWN BY: KMC IDA'IF: 2/6/'91 BOP STACK CONFIGURATION 13 5/8", 5000 PSI WP TRIPLE RAM STACK DRILLING RISER ANNULAR PREVENTER 2" KILL LINE MANUAL HYDRAULIC GATE GATE I P l PE RAMS I BLIND RAMS DRILLING SPOOL 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE I PIPE RAMS i I I ACE HOLE DIVERTER SYSTE?v, Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. 10" Full Opening Valves 35' or as required Dresser Sleeve 1. Ail pipe connections 150# ANSi Flanges or welded connections and secured to prevent movement. 10" Diverter Line 2. Manual 10" full opening valves mechanically connected to ensure that one valve is fail-safe open at all times. 3. All tums are 90 deg. and targeted. 10' Full opening ball valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10' Side Outlet M EM 1/3/90 _$4~DUA247' [DRANO25]Y34_CLOSAP_SHORT7."LIS; 2 22-MAY-1991 16: 37 .- --- Closest Approach Analgsis --- .~, ,-,Da t el-~---2 ~-- MA>/.~9-1-~T~i m e ;,--1 & .'.-37. ;.3~ ,, Seapch Radius= ~00 .7 I}E~REE LEAD LINE .............................................. :.:..-~ ....... ' '1 ,,~ Location : W-E S-N TVD(SBS) ~ ............. . -. . :-,:-_: :-~ ;..-18I T 0 P . .. 5z~25,-00 .~5~4~7~g0---------88700 = .................................................................... .. ,'~ Bottmm '647441.31 ' 5~47680.04 ~4~1.'00 '"' ...................... 8 '' ' · · . ........... ~ - . , '' · ' ,* ...... ' ........ ...... ' '." ....... "' ~ ' · ' ~:.'."' '..; ,. ~:'.".. ~. '. ~*"" '" -' .' '. '.," ;.' ,' · "~..~. ~'~ , C 1 :~ li~ WELL' IDENT c':"':'.'.f'"':':.[v'] . ,2 '.-, ...'-:2...: .. ',~" .:~,:.:C~.:~;~:'~,: Jit~.¥ .;~.~,T~D 2L, ~'; t':1 y-1 6.6 o. 0 o. 0 o. 0 ~06. 4 · -- lq.., ~o~-~o4 z ~ oo ================================================ :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::-...~.. :.:; -~. :::::::::::::::::::::::::::::::::::::::::::::.:e:.~.:::.::::...~: ::=:,::: ::.:":-:? :.:::::::::i.::...:~:~&:: ::]~::?:,,:. ::,g~ :::::::::::::::::::::::::: ~ ~,~. -r:,., ... "?:3 ";: ':'''' ': :"::"';::7'::'::":r'-~7 ':: ??T::'~"":::':~.'":';'~:i:~" -.':-:;".':~f:~'~.:~-~:t~:t:~':' '~ :::'-:::-:"r,::.'~::r:~'r:' ~': : :; '~::'-~:'~:.'-t':-".: :..:~:::::~::...:., ,:- .,.,..:,,.. ":': -.:" ... ....... J I ' A0~-204~300 ' ' ....................... : ~-i C 1-o~-e-s-~--a p p~o a c.h--d-i-.s ~; an c e---= .......... ~c2. -c2..-.~ e e t -- . · :.., ~ ........ ~ .................. . .............. · ......................... _ _.'j ............. · .... ~ ...... . .. !:j KICK OFF ~o~ this' ~un'T'-'..' '.'=. 4500.0 ~eet~'-T-.~.-. ........ -~.:- ;:] ....... : .................. _~DU~2~7' [DRANO2~]Y34_CLOSAP_SHORT, LIS; 2 --- Closest Approach Analysis --- ,,/, , ~ · ~2~ - .,! Sea,ch Radius= ~00 COURSE LINE · ..... ..: ,~o~p.~opos. e~e-l-t~:, Y.-~ ·" -[23-34~1-1-t33 ': ~ Location = W-E S-N TVD(S~S) Iii :'" "Bottom' ..J.. ~47263::..70.,'.-:'5947432, 03':~z-'.:'-::::.~451:"00 '' J · 1 ~~ - ............. O.t-ese-~ .Ala~,4:,-e,a-el"~ ,,,~, ,,~...~ ,,~ ..... -,~.:~ ....... ;.,,~c '.: .:.,:. --Ver-t'"i-ea".~-FA''R-'''' .....ti on :-, :.-, ..:-...: ..... WELL "' ~¢ r,-,.¢~ .......... .;.' ................................................ Z.~(;,;" ,...',:,,;2L, /PROPOSED% .......... ' ......... /NEARBY~'~i -' TVD. DEPART, ......... ..';";: ..... :,.;TVD, :.:..,,...,DEPART; ;...;:','~..., . .. ~.,:.:,., . DISTANCE. .=,,." :: TVD - DEPART . -:. .......... TVD . ......... DEPART'. ................. , i : .,., ..: ,:..,,,.~:: ...... ,,..,, :,, ...... ,, ..... , .......... , ................ .,i.,.,,.:,:. ......... · ..... A029-2039400 Y-I 6.6 O' 00. 0 O. 0 256. 4 I~aL~AO~-203.~ 500 . . . .............. . ......... .,:.,. 240&. 9 O. 0 2399'. 8 28. '8 ^02-'7-.--Z04,3~00 ........... ,-~,..-.,, -.-,. ~, '~ .... L/,-.: ~.. ;.2:, [ - . ................ . ~7t v ~ - · .....; ....... ~ = ..... ..'.,.':...". ',,"': '" ',~?::.t':' . ...... .:'; .... '":.*;.' ........ .*r .... Ii , -, ,0-7--~-~, ~0 . '" ' '%: .-' "-- ."-. Y-B . 11S8 0 00 - JIB2 1 '~ .- 4c22. b ~ P~.'~o:-?-?z~:oo : ..... , .............. '.,~.:: .......... '217 ....... ' ....... : ::L'. -. J'. , mV~f~:'.,,: _ "' :-' :~' Z'~:~?'~!? .... ,:,; F,:.,~'-.~,::~:_~:' .*,r,~,~'~?~t"-:.:, ' .... ~-':':-_.'.r::.' :~:i.' ....... ~i'~-"::m'i%--:7 ,. -,,, .:,Y 14 -; .... ~: .., ~ 5535. ! ,,, ,~247. ~ , ..e,~.,,~,~Si,;,-.~z., ..... ~44 -0~-,,~,.-,-~ J23,:,9.~,~5306..8 ,,?., ...... 147. ! ...... :,~;¢~bO~.,,~ ,.-..=,?~E!64 .~_ 30 ...... · :,k I SUMMARY ~361 ~--C-l-e-~e=~t~app-~-oach--d-i-m4;ance - KICK OFF Cot this run ....... The ~eii ~hich come~ closest to the proposed t~ell"'i~:.'"'!':.i::.('?!:'~:.! ..... . ......... . .......... '.--:-~"". -:' ':" ,i ' -'i: .... '~i',' 2.'"':':-~.~!'~J.~'2..-.i~:,,[i~':~.-.~'~-'-~ .... ~...~:-':~.: ....... '..,L:,: .... ;.-:...l~,l AOL:~--204-1-t-O0 v ,~ - :..'~:.[ -' · · ·: ....';'--- :- ..? .... :': ."..:. ':.."- ....... -'.' '- ........ .... ]ssI ~ '.'. .... L:./_.iL .".2'.; .'_"12 ' :. -_ ' ~ ' -.-' ,, ............. ' .................. -'" -. , ..... ~;~= ,... :.. ......... ~ ........ .... ¢ -': F':"-'::':"':."I[:(i.L~!{.":.;:': .'i:'~".'-'.'-' L": '.';::'.'.[~'.:,'~2 ..... i; ............... . ................................ -' -..z..:. ': ......... : :~... '-'-'. .... . . ,. MUD WEIGHT WELL Y-34 CALCULATIONS (23-34-11-13) Mud Wt. (6-3/4" Hole)' 8.9 ppg. P Sag River: P Sadlerochit' P Top Sadlerochit: 3900 psi. 3680 psi. at 8800' TVD SS (=8888' TVD BKB) 3702 psi. (gas grad. 0.12 psi/fi) (oil grad. 0.35 psi/E) OB Sag River: OB Top Sadlerochit: Current GOC: 195 psi. 440 psi. Above Top of Sag 7-5/8" Casing Pt. Top Sag River Top Sadlerochit 8840' TVD BKB 8848' TVD BKB 8951' TVD BKB 10-3/4" cASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 7-5/8"CASING Measured Depth: Basis' Total Cement Vol' Lead Slurry Vol' Tail Slurry Vol: 5-1/2" LINER Measured Depth' Basis' Total Cement Vol: Cement Calculations 268O' 3.0 x Annular volume (0.3637 cuft/E) 2924 cuft 1868 cuff 973 Sx Cold Set III @ 1.92 cuft/Sk 1056 cue 1100 Sx Cold Set II @ 0.96 cuE/Sk 9365' 90% Annular Vol. to 10-3/4" shoe +36 cue (0.2148 cuft/ft) 1328 cuff 1178 cuff 595 Sx G+8% @ 1.98 cuft/Sk 150 cuft 130 Sx Neat G @ 1.152 cuft/Sk 9115' Hanger- 9800' Shoe 1.5 X Annular volume to 7-5/8" shoe + 100 cult (0.0835 cuft/ft) 155 cue 132 Sx Neat G at 1.175 cuft/Sk RIS 5/23/91 ALASKA UNITED RIG NO. 3 MUD SOLIDS CONTROL EQUIPMENT 1 - Brandt Dual Tandem Shale Shaker 1 - Demco 6-12" Cone Shale Desander 1 - Demco 416H w/16 cones & (1) Demco 48H w/16 cones (Desilter) 1- Tri-Flo Horizontal Vacuum Atmospheric Mud Degasser 1- 200 gpm Operating Capacity Centrifuge 1 9- Brandt MA5 Mud Mix Agitators 1- 125 bbl. Trip Tank 1- Recording drilling fluid pit level indicator with both visual and audio warning devices at driller's console 1- Drilling fluid flow sensor with readout at driller's console I- Cavium Dewatering screen assembly RIG 3 MUD SYSTEM ./ ./ C ~):1~~ ivac~v ALASKA UNITED DRILLING INC. RIG 3 MUD SYSTEM DATE October 1987 SCARE APPROY~D FILE ** CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE DATE '~'9-thru I3] ' 10. ~..~t ,.~-,.sv - ~'l ,. 11. [10 & 13] 12. (4) Casg ~.~,/.z~. ,5~-~'~-9! 14. [14 thru 22] 15. (5) BOPE /~.~, ~'-Z2- 9f [23 thru 28] (6) Other [ 2~9~ th 16. 17. 18. 19. 20. 21. 22. Company. _/~2, /~, Lease & Well YES NO Is permit fee attached ............................................... /~ REMARKS 2. Is well to be located in a defined pool ................. . ............. z~._ 3. Is well located proper distance from property line ................... 4. is' well located proper distance from other wells ..................... 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated & is wellbore plat included ................... 7. Is operator the only affected party .................................. 8. Can permit be approved before 15-day wait ............................ 23. 24. 25. 26. 27. 28. Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease nkrnber appropriate .......................................... Does well have a unique name & nLrnber ................................ Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. ~ 29. 30. 31. (6) Add 1 /~.~-/',~. 5'-Z?-~7 / 3 2. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~-'~oo psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additional requirements ............................................. geology' en9 i neer i n~:, DWd MTM.,~," LCS~?,~"'" dH INITIAL ..GE01 UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE rev 03/29/91 jo/6.011 0 ~'Z ~0 rn Z Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. .. No special'effort has been made to chronologically organize this category of information. _CoPyright 1987,1988,1989,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. Tape Subfile 1 is type: LIS **** REEL HEADER **** 91/ 7/10 **** TAPE HEADER **** 91/ 7/10 Tape Subfile: 1 Minimum record length: Maximum record length: Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA 2 recOrds... 132 bytes 132 bytes JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD RUN1 76923 JOHN DAHL B. BRYANT 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING Ail rights reserved. Y-34 500292217800 BP EXPLORATION ATLAS WIRELINE SERVICES Il-JUL-91 RUN2 RUN3 34 lin 13E 1257 512 86.97 49.64 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.750 7.625 941.7 REMARKS: NO DEPTH SHIFTS REQUIRED. CIRCULATION STOPPED 11:15 13-JUN-91. $ **** FILE HEADER **** .001 FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS C/cC/ Ail tool strings; depth shifted and clipped curves; all runs merged; no case hole data. DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE BCS DIL 2435 SP GR $ BASELINE CURVE FOR SHIFTS: START DEPTH 9416.0 9416.0 9416.0 9416.0 9410.0 GR FROM BCS STOP DEPTH 9786.0 9834.0 9786.0 9844.0 9786.0 CURVE SHIFT DATA (MEASURED DEPTH) --- EQUIVALENT UNSHIFTED DEPTH RUN NO. PASS NO. MERGE TOP ALL CURVES ON DEPTH. NO DEPTH SHIFTS REQUIRED. $ BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE REMARKS: CN : BP EXPLORATION WN : Y-34 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA MERGE BASE * FORMAT PECO~D (TV~ 6~.) Tape depth ID: F 13 Curves: Name Code Samples Units Size Length 1 DT 68 1 US/F 4 4 2 FUCT 68 1 CPS 4 4 3 GR 68 1 GAPI 4 4 4 ILD 68 1 OHMM 4 4 5 ILM 68 1 OH/~M 4 4 6 LL8 68 1 OHMM 4 4 7 MTEM 68 1 DEGF 4 4 8 NPHI 68 1 PU-S 4 4 9 NRAT 68 1 DIM 4 4 10 NUCT 68 1 CPS 4 4 11 SP 68 1 MV 4 4 12 TEND 68 1 LBF 4 4 13 TENS 68 1 LBF 4 4 Tape File Start Depth = 9865.000000 Tape File End Depth = 9320.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15275 datums Tape Subfile: 2 135 records... Minimum record length: 62 bytes 52 -Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS **** FILE HEADER **** .002 FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH 2435 7954.0 9414.0 GR 7944.0 9414.0 $ BASELINE CURVE FOR SHIFTS: GR FROM BCS CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH $ REMARKS: NO DEPTH SHIFTS REQUIRED. $ CN : BP EXPLORATION WN : Y-34 FN : PRUDHOE BAY COL~ : N. SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) Tape depth ID: F 7 Curves: Name Code Samples Units Size Length 1 FUCT 68 1 CPS 4 4 2 GRCH 68 1 GAPI 4 4 3 NPHI 68 1 PU-S 4 4 4 NRAT 68 1 DIM 4 4 5 NUCT 68 1 CPS 4 4 6 TEND 68 1 LBF 4 4 7 TENS 68 1 LBF 4 4 Tape File Start Depth = 9490.000000 Tape File End Depth = 7930.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 24969 datums Tape Subfile: 3 127 records... Minimum record length: 62 bytes Maximum record length: 998 bytes 28 Tape Subfile 4 is type: LIS **** FILE HEADER **** .003 FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH BCS 9416.0 DIL 9416.0 9416.0 9410.0 9416.0 2435 GR SP $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOp LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DUAL INDUCTION ACOUSTIC PULSE CODE MODULATOR NEUTRON GAMMA RAY TEMPERATURE CABLE HEAD TENSION DIFL AC PCM CN GR TEMP MIS CHT $ STOP DEPTH 9812.0 9834.0 9786.0 9786.0 9844.0 13-JUN-91 FSYS256 REV:G002 VER:2.0 1115 13-JUN-91 1641 13 -JUN- 91 9841.0 9846.0 9415.0 9816.0 0.0 TOOL NUMBER 1503 1603 3506 2435 1309 2806 3967 3974 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 6.750 9417.0 9415.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): XCD POLYMER 8.90 39.0 7.5 6.8 182.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: CN : BP EXPLORATION WN : Y-34 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA 0.374 0.137 0.344 0.000 0.402 0.000 THERMAL SANDSTONE 0.00 0.000 0.0 67.0 182.0 67.0 0.0 67.0 0.0 * FORMAT RECORD (TYPE# 64) Tape depth ID: F 17 Curves: Name Code Samples Units 1 AC 68 1 US/F 2 ACQ 68 1 DIM 3 CHT 68 1 LBF 4 CILD 68 1 MMHO 5 CLSN 68 1 CPS 6 CN 68 1 % 7 CNC 68 1 % 8 CNRA 68 1 DIM 9 CSSN 68 1 CPS 10 GR 68 1 GAPI 11 RFOC 68 1 OPIMM 12 RILD 68 1 OH/~4 13 RILM 68 1 OHMM 14 SP 68 1 MV 15 SPD 68 1 F/MN 16 TEMP 68 1 DEGF 17 TTEN 68 1 LBF Size Length 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Tape File Start Depth = 9865.000000 Tape File End Depth = 9320.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 54534 datums Tape Subfile: 4 235 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes 68 RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY Tape Subfile 5 is type: LIS **** FILE HEADER **** .004 FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 2 0.5000 VENDOR TOOL CODE START DEPTH STOP DEPTH BCS 9416.0 9812.0 DIL 9416.0 9834.0 2435 9416.0 9786.0 GR 9410.0 9786.0 SP 9416.0 9844.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DIFL AC PCM CN GR TEMP MIS CHT $ DUAL INDUCTION ACOUSTIC PULSE CODE MODULATOR NEUTRON GAMMA RAY TEMPERATURE CABLE HEAD TENSION 13-JUN-91 FSYS256 REV:G002 VER:2.0 1754 13-JUN-91 1641 13-JUN-91 9841.0 9846.0 9415.0 9816.0 0.0 TOOL NUMBER 1503 1603 3506 2435 1309 2806 3967 3974 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 6.750 9417.0 9415.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): XCD POLYMER 8.90 39.0 7.5 6.8 182.0 0.374 67.0 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: CN WN FN COUN STAT : BP EXPLORATION : Y-34 : PRUDHOE BAY : N. SLOPE : ALASKA 0.137 0.344 0.000 0.402 0.000 THERMAL SANDSTONE 0.00 0.000 0.0 182.0 67.0 0.0 67.0 0.0 * FORMAT RECORD Tape depth ID: F 17 Curves: Name (TYPE# 64 ) Code Samples Units 1 AC 68 1 US/F 2 ACQ 68 1 DIM 3 CHT 68 1 LBF 4 CILD 68 1 MMHO 5 CLSN 68 1 CPS 6 CN 68 1 % 7 CNC 68 1 % 8 CNRA 68 1 DIM 9 CSSN 68 1 CPS 10 GR 68 1 GAPI 11 RFOC 68 1 OHMM 12 RILD 68 1 OHMM 13 RILM 68 1 OHMM 14 SP 68 1 MV 15 SPD 68 1 F/MN 16 TEMP 68 1 DEGF 17 TTEN 68 1 LBF Size Length 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Tape File Start Depth = 9865.000000 Tape File End Depth = 9320.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 64228 datums Tape Subfile: 5 233 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes 68 Tape Subfile 6 is type: LIS **** FILE HEADER **** .005 FILE HEADER FILE NUMBER: 5 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH 2435 7954.0 GR 7944.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DIFL AC PCM CN GR TEMP MIS CHT $ STOP DEPTH 9414.0 9414.0 DUAL INDUCTION ACOUSTIC PULSE CODE MODULATOR NEUTRON GAM~5~ RAY TEMPERATURE CABLE HEAD TENSION 13-JUN-91 FSYS256 REV:G002 VER:2.0 1825 13-JUN-91 1641 13-JUN-91 9841.0 9846.0 9415.0 9816.0 0.0 TOOL NUMBER 1503 1603 3506 2435 1309 2806 3967 3974 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 6.750 9417.0 9415.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: XCD POLYMER 8.90 39.0 7.5 6.8 182.0 0.374 0.137 0.344 0.000 0.402 0.000 67.0 182.0 67.0 0.0 67.0 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: CN : BP EXPLORATION WN : Y-34 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA THERMAL SANDSTONE 0.00 0.000 0.0 * FORMAT RECORD (TYPE# 64) Tape depth ID: F 10 Curves: Name Code Samples Units 1 CHT 68 1 LBF 4 2 CLSN 68 1 CPS 4 3 CN 68 1 % 4 4 CNC 68 1 % 4 5 CNRA 68 1 DIM 4 6 CSSN 68 1 CPS 4 7 GR 68 1 GAPI 4 8 SPD 68 1 F/MN 4 9 TEMP 68 1 DEGF 4 10 TTEN 68 1 LBF 4 Size Length 4 4 4 4 4 4 4 4 4 4 Tape File Start Depth = 9487.000000 Tape File End Depth = 7935.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 122834 datums Tape Subfile: 6 341 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile 7 is type: LIS **** TAPE TRAILER **** 91/ 7/10 **** REEL TRAILER **** 91/ 7/10 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 10 JLY 91 1:25p Elapsed execution time = 49.43 seconds. SYSTEM RETURN CODE = 0 40