Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
192-061
THE MATERIAL ~ERTHIS COVER HAS BEEN MICROFILMED ON-OR BEFORE NOVEMBE.R 13, 2000 E.. _ P L E.:_'. 'W R PLUGGIS: &LOCATION CLEA-..%NCE REPORT State of Alaska File: · ALASKA 0IL & GAS CONSERVATION COM/~ISSION PTD ~o. Lease ~: mTdO,, Abnd Date Completed Peri i~=mr~a!s - tops: Review the well file, ~ud' comment on plugging, well head Code 97~1o7 Sigaed .' o. STATE OF ALASKA ALAS'"'"OIL AND GAS CONSERVATION COMI'~-"'SION WELL CO,vfPLETION OR RECOMPLETION REPOR ,. AND LOG 1. StatUs of Well Classification of Service Well ~] Oil ]--] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 92-61 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22275 4. Location of well at surface ~~ 9. Unit or Lease Name 4648' SNL, 4344' WEL, SEC. 32, T12N, R13E~~ Prudhoe Bay Unit At top of productive interval 10. Well Number 3282' SNL, 2861' WEL, SEC. 31, T12N, R13E ~ R-29 At total depth !!.~;::c '.'~' . !. 11 . Field and Pool 3111' SNL, 3276' WEL, SEC. 31, T12N, R13E Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE=51.5I ADL 28279 12. Date Spudded8/11/92 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' water depth' if OffshOre ' 16' NO' Of COmpletiOns8/23/92 6/18/97 N/A MSL I One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)119. Directional SurveyI 20. Depth where SSSV set~l. Thickness of Permafrosl 10750 9177 FTI 10070 8633 PTI [~Yes [~No I 2084 MD! 1900' (Appr0x:.) ............ 22. Type Electric or Other Logs Run GR/SP/DI/SFL/BHC/CNL GR/SP/DI/SFL/BHC/CNL 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT, PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Conductor H-40 Surface 80' 30" 10 3/4" 45.5# NT-80 Surface 3051 13 1/2" 2163 c.f. 7 5/8" 29.7# L-80 Surface 9959 9 7/8" 1173 c.f. 5 1/2" 17# 13CRFL4S 9723 10750 6 3/4" 160 c.f. 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4 1/2" TDS 9741' MD MD TVD None- Not on 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. Production DEPTH iNTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10200-10070 103 c.f. cement ORIGINAL Date First Production IMethod of Operation (Flowing, gas lift, etc.) not on production ! Date of Test Hours Tested ' PRODUCTION OIL-EEL GAS-MCF WATER-EEL CHOKE SIZE IGAs-OIL RATIO I FOR TEST · Flow Tubing Casing Pressure CALCULATED · OIL-EEL GAS-MCF WATER-EEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ............................................................................. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Marke... 30. Formation Tests i Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Sag River 10017 8641 Shublik 10067 8679 Sadlerochit 10159 8748 31. List of Attachments Summary of Daily Drilling Reports, Surveys 3~. i I~ereby certify that'"i~'"i~;~'g'~ing'is true and correct to the best of'mykn0Wiedge .............................................. Signed/~.~U~. ~'o~x, ~~,,,~,/") Title Petro Technical Assistant Date ~/~/('-~ ~ Prepared By Name/Number: INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 R-29 Cement Plug, Daily Operations 6118197 MI RU DS CTU #6, Gas Lift was SI at 0500 hours. Repair hydraulic fitting. FP flow line with 6 bbls of MEOH, Fluid packed the well with FSW, RIH. Stopped at 10200' Cool sump down with 100 bbls FSW. Pumped 5 bbl FW, 20 bbl 15.8 ppg cement, 5 bbl FW, Layed cement from 10200' to 10150', Reciprocated nzl from 10150 to 10130' Cement out nzI. Estimated 6 to 7 bbl cement in perforation and built WHP to 1000 psi with 11 bbl cement out the nozzle. Held pressure at 1000 psi. PUH to safety at 8800'. WOC 30 minutes. Dropped 7/8" ball contaminated cement with 60 bbl Biozan Made 6 passes from 10100' to 9100' using biozan and seawater. POOH. Jetted all GLM clean. Circulated Contaminated cement to surface. 20 Class "G" Cement. Density = 15.8 ppg APl WL at 118 mi. 6120/97 MU nozzle. TIH. Didn't see cement @ 10180'. TIH to 10200' No tag. PT casing to 1500 psi. Good test. Circ to clean to 10200'. Pump 3 bbls cmt (66 mL water loss, 4:29 thickening time). Lay in plug 1:1. Estimated cement top 10070'. POOH circulating. Freeze protect to 500'. Leave well SI w/130 psi. 6123197 Correlated to jewelry log ( 27-Sept-92 ). Whipstock top @ 10,041', 12 deg. left. RA tag is 8.2' from top of whipstock. 6126197 MIRU DS #6. Pump ball and test BOP's. Good test. MU BHA#1. Dry tag XN @ 9705' CTMD. Mill XN with 4 stalls and dress. TIH to whipstock. Dry tag WS @ 10042'. Flag pipe. Start milling window. Pulled 3000# over after 1st stall. Motor not turning. Dry tag to try to free up. Motor shelled. POOH. MU 2® Baker Mach 1 motor. RIH. Stalled @ 10047'. Dry tag @ 10048'. Note pipe flag. On the window @ 10043.5' after 3 stalls. Stalled once more 2.5' into window. Out of window @ 10048.7'. Milled to 10050' and stacked weight with no pressure increase. Dressed window. Pulled 4000# over at the top of the window. Continued dressing the window. POOH. OOH. Mill showed positive indication of exiting window. 6~27~97 DS on location. MU BHA #2. PT to 4000 psi. TIH. Tag XN. Dress XN with no stalls. TIH. Tag whipstock @ 10044.8' Start reaming with 1 stall. Mill 10.5' into the formation 10056'. Dress window. Dry tag with clean PU. Pump FIo-Pro sweep and drop circ ball. Leave 9 bbls FIo-Pro across window. POOH chasing sweep. Freeze protect well and flowline. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Date: May 30, 1997 To~ Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Blair Wondzell Sr. Reservoir Engineer ORIGINAL Re~ Well R-29A Prep for CT Sidetrack Well R-29 is scheduled for a through tubing sidetrack to be drilled with coiled tubing. The following summarizes the procedure required to prepare R-29 for sidetracking and is submitted as an attachment to Form 10-403. 1. Perform tubing integrity test. 2. Drift tubing and liner with a 3.7" OD, 20 ft long drift. 3. RU service coil and abandon existing perforations with approx. 20 bbls. cement. Squeeze to 1000 psi. Contaminate and circulate out cement to approx. 10,100'. Notify AOGCC to witness pressure test. 4. Underream whipstock interval, 10,000' to 10,060'. Tag cement top with AOGCC witness. 6. Rig up e-line unit and set permanent whipstock at 10,041' 7. Mill window in liner from 10,046' - 10,052'. CT Drilling Engineer cc: Well File Petrotechnical Data Center STATE OF ALASKA ALA~©IL AND GAS CONSERVATION COMMIS,°-,-~'~ APPLICA'i ,,.)N FOR SUNDRY AF. ROVALS .. TyPe of Request: Abandon x Suspend __ Operation Shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging x Time extension __ Stimulate __ Change approved program __ Pull tubing __ Variance __ Perforate __ Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchoracle, Alaska 99519-6612 4. Location of well at surface 4648' SNL, 4344' WEL, SEC. 32, T12N, R13E 5. Type of Well: Development x Exploratory __ Stratigraphic __ Service 6. Datum elevation (DF or KB) KBE=5 I. 5 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-29 At top of productive interval 3282' SNL, 2861' WEL, SEC. 31, T12N, R13E At effective depth 3134' SNL, 3219' WEL, SEC. 31, T12N, R13E At total depth 3111' SNL, 3276' WEL, SEC. 31, T12N, R13E 9. Permit number 92-61 10. APl number 50- 029-22275 11. Field/Pool Prudhoe Off Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10750 feet 9177 feet 10670 feet 9119 feet Casing Length Size Structural ._ Conductor 110 20 Surface 3021 10 3/4 Intermediate 9929 7 5/8 Production __ Liner 1027 5 1/2 Perforation depth: Plugs (measured) Junk (measured) Cemented 2163/399 c.f. A S III "G" 1173/215 c.f. Neat "G" ORIGINAL Measured depth True vertical depth BKB 140 140 3051 3029 9959 8575 160 c.f. Class "G" 9723-10750 8393-9155 measured 10160'-10180', 10180'-10200', 10210'-10230' true vertical subsea 8696'-8726',(two intervals} 8734'-8749' Tubing (size, grade, and measured depth)4-1/2" TDS @ 9741'MD Packers and SSSV (type and measured depth)Packer 9695' MD, SSSV2084'MD 13. Attachments Description summary of proposal__ Detailed operations program __ BOP sketch 14. Estimated date for commencing operation 6/14/97 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Suspended __ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~,,~~ Title Coil Tubincl Drillincl Enclineer ~~~ FOR COMMISSION USE ONLY Date ~,,~.~,/¢'¢.>' Conditions of approval: Notify Commission so representative may witness Plug integrity ? BOP Test ~ Mechanical Integrity Test __ Approved by order of the Commission Form 10-403 Rev 06/15/88 Location clearance ,.o~~ Subsequent form required 10- ~-/'o'7 Ne, G° 3sv d W. J0hnstnn ~missioner ]Approval Date ~, ---" ~ --,,¢" S U BM IT IN TRIPLICATE ~..~ LARRY GRANT - Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 28 December 1995 Transmittal of Data Sent by: HA};D CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION ECC No. -1 PLS FINAL BL+RF Run ~ 1 2373.04 1 PLS FINAL BL+RF Run # 1 3695.01 .. 1 PLS FINAL BL+RF Run ~ 1 5753.06 1 GR/CCL FINAL BL+RF Run ~ 1 1 PLS FINAL BL+RF Run ~ 1 5761.08 Run ~ 1 5857.02 1 PLS FINAL BL+RF Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite ~-01 ~ ~chorage, ~ 99518 Received by~~ //~ Date: ,,,.~ STATE OF ALASKA ALASI'! !L AND GAS CONSERVATION COMMISSlO"-'- REPORT SUNDRY WELL OPEr, ATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging__ Pull tubing Alter casing __ Repair well __ Perforate X Other X 2. Name of Operator BP Exploration (Alaska)/nc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE=51.5 feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 8. 4648' SNL, 4344' WEL, SEC. 32, T12N, R13E At top of productive interval 3282' SNL, 2861' WEL, SEC. 31, T12N, R13E At effective depth 3134' SNL, 3219' WEL, SEC. 31, T12N, R13E At total depth 3111'SNL, 3276' WEL, SEC. 31, T12N, R13E Well number R-29(23-31-12-13) 9. Permit number/approval number 92-61 / 10. APl number 50- 029-22275 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 3021 Intermediate 9929 Production -- Liner 1027 Perforation depth: measured 10750 feet Plugs (measured) 9177 feet 10670 feet Junk (measured) 9119 feet Size Cemented 2O 10 3/4 7 5/8 2163/399 c.f. AS III "G" 1173/215 c.f. Neat "G" 5 1/2 160 c.f. C/ass "G" 10160'-10180', 10180'-10200', 10210'-10230' Measured depth 140 3051 9959 9723-10750 True vertical depth BKB 140 3029 8575 8393-9155 true vertical subsea 8696'-8726',{two intervals} 8734'-8749' Tubing (size, grade, and measured depth) 4-1/2" TDS @ 9741'MD Packers and SSSV (type and measured depth) Packer 9695' MD, SSSV2084'MD 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 866 1049 264 1420 597 1150 1150 1530 Tubing Pressure 231 225 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 7. I hereby ce, rtify that the f/~ing~ and :orrect to the best of my knowledge. Signed ~~ t Y .l"! ~u'wJ.x Title Senior TechnicalAssistant II Form 10-40-4/Rev 06/15/88 ~ D at e ~,//.¢'//',¢~ SUBMIT IN DdPdCATE 5124194 8/5194 9/24/94 WELL R-29(23-31-12-13) HCL/Addperf/NRWO Operation A HCL Acid Wash Treatment was performed using the following fluids: SUMMARY; SHUT IN GAS LIFT AT 0000 HRS. KILLED THE WELL WITH 85 BBLS FSW.ACIDIZED WITH 128 BBLS 15 % HCL WITH 10 PERCENT XYLENE. RECIPRICATED THE COIL 7 TIMES WHILE SPOTTING THE ACID. OVERDISPLACED WITH 47 BBLS FSW ITH 0.2 PERCENT NE-18 WHILE RECIPRICATING COIL. POOH. COIL PARTED AT 1400 FT WHILE PULLING OUT OF THE HOLE (PART WAS AT THE GOOSENECK. CAUGHT PIPE SHUT DOWN PUMP. CHECKS APPEARED TO FAIL CUT THE PIPE AFTER 4 MINUTES. KILLED THE WELL WITH 320 BBLS FSW. RIGGED LIP SLICKLINE WITH BRAIDED CABLE. CAUGHT FISH IN THE BOPS. PICKED LIP AND MADE A COLD ROLL SPLICE. FLUIDS PI. JMPED DOWNHOLE BBLS. 425 60 128 613 FILTERED SEAWATER. FILTERED SEAWATER WITH 0.2 PERCENT SURFACTANT 15 PER CENT HCL WITH 10 PERCENT XYLENE TOTAL R£CEIVED The following additional interval were perforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 10041 - 10067' MD aiaska uJi 8, Gas Cons. Commission A NRWO Squeeze Cement Plug was performed using the following Anchorc , fluids: JOB SUMMARY WELL SI ON ARRIVAL. LP W/220 BBLS 90 DEG SW. RIH AND TIE INTO JEWELRY. SET BAKER INF BP @ 10095'. OPEN CIRC SUB AND ESTABLISH INJECTION RATE OF 1.5 BPM @ 400 PSI. BJ PUMP ACID AS SHOWN BELOW @ AIR 2.2 BPM @ 390 PSI. UNSEAT PACKER AND POOH. INSTALL CEMENT NOZ AND RIH. TAG PBD @ 10431', NO CORRECTION. PUMP 4 BBLS 17# BIOZAN PILL AND LAY IN SUMP. WAIT TO SETTLE THEN WASH CLEAN TO 10270'. LAY IN 4 BBLS HI FL FROM 10260' TO 10088' WITH CHKS CLOSED. LAY IN LOW FL TO 10020' AND HANG AND YOYO COIL. PUMP 50 BBL HI FL CMT. SWITCH TO LO FL CMT. PUMP 24 CMT, WHP CLIMBED TO 200 PSI. SWITCHED TO EW. AFTER 4 BBLS SWITCH TO SW. 3 BBLS SW AWAY WHP CLIMBED TO 500 PSI. CRACK CHKS AND HOLD 500 PSI AND LAY IN 26 BBLS CMT IN WELLBORE WHILE PUH. UNABLE TO GAGE RETURNS DUE TO GASSY RETURNS. DROP WHP TO 200 PSI, THEN BUILD TO 1700 OVER THE NEXT 30 MINUTES. SD AND CHECK BLEED OFF. WHP DROPPED TO 400 PSI OVER 10 MINUTES. BUILD WHP TO 800 PSI AND HOLD FOR 20 MINUTES ADN SD. WHP DROPPED TO 350 AND HELD. DROPPED JETTING BALL AND PUMPED 30 BBLS DUOPOLYMER ON DOWN JET PASS 9990' (50' ABOVE SAG PERFS). JET 30 BBLS BIOZAN UP TO 6510'. JET DOWN WITH FSW TO 9990'. CHASE CONTAMINATED CMT TO SURFACE. RECOVERED 8 BBLS OF CMT. WOC. RIH W/UNDERREAMER BHA. LOST 1000# STRING WT Page 2 WELL R-29(23-31-12-13) AT 10130'. BEGIN UNDERREAM. SET DOWN AT 10170'. UR DOWN TO 10280' AT ABOUT 20 FPM. WITH WHP OF 30 PSI, 100 % FLUID RETURNS. GOT STUCK TWICE. ONCE AT 10,254, AND AGAIN AT THE TT. DROPPED BALL TO OPEN CIRC SUB AND PUMPED 3 BPM AWAY DOWN THE COIL AT ZERO WHP. LOSS OF RETURNS MAY HAVE BEEN A FACTOR IN GETTING STUCK. UNABLE TO PULL BHA INTO TT. UNDERREAMER ARMS APPARENTLY STUCK OPEN. FINALLY GOT THRU BY DISPLACING COIL WITH N2. POOH, RECOVER 100% OF UR BHA, 2 BLADES ON UR WERE STUCK HALF OPEN, SLIGHT SCARRING ON SIDES OF BLADES, DIDN'T ALLOW THEM TO RETRACT FULLY. R/D CTU. LEFT SQZ UNIT ON LOCATION. E-LINE TO DETERMINE WHICH SQZ PERFS ARE LEAKING. LEAKING AT 2.6 BPM AT 2000 PSI WHP. FLUIDS PUMPED BBLS. 220 BBLS SW TO LOAD WELL 75 BBLS SW TO DROP BALL AND SET PACKER, OPEN CIRC SUB AND INJECT 20 BBLS 15% HCL ACID 20 BBLS 12/3 HF ACID 40 BBLS NH4CL 35 BBLS SW 23 BBLS SW 2 BBLS DUOPOLYMER 4 BBLS 17PPB BIOZAN 1 BBL DUOPOLYMER 35 BBLS SW DISPLACEMENT 68 BBLS SW COOLDOWN 4 BBLS EW (PREFLUSH) 4 BBLS HIGH FL CEMENT 50 BBLS LOW FL CEMENT 24 BBLS HIGH FL CEMENT 4 BBLS EW (SPACER) 106 BBLS SW (DISPLACEMENT) 60 BBLS DUO POLYMER (CONTAMINANT) 403 BBLS SW (DISPLACEMENT) 2241 BBLS SW (UNDERREAM) 30 BBLS BIOZAN (SWEEPS) 35 BBLS MEOH (FREEZE PROTECTION CT) WELL UNDERREAMED TO 10,297' CTD CEMENT (B.J. SERVI(~ES)-HIGH FLUID LOSS 15.8 PPG CLASS "G" CMT CONTAINING, 1.07% FL-20,0.1% CD-31 0.05% R-11, 1.0 GAL PER SK FP-6L CEMENT (B.,I. SERVICES)-LOW FLUID LOSS 15.8 PPG CLASS "G" CMT CONTAINING, 1.07% FL-20,0.1% CD-31 0.05% R-11,1.0 GAL PER SK FP-6L R[ CEIVED Oil & (]as Cons. Commission ,'~ .... 10/4/94 Page 3 WELL R-29(23-31-12-13) A NRWO Squeeze Cement Plug was performed using the following fluids: WELL SI ON ARRIVAL. LIQUID PACKED WITH 305 BBLS 110 DEG FSW AT AIR 3.9 BPM @ 2200 PSI. TAGGED HARD PBD @ 10300' CTD-DID NOT CORRECT TO 10283' ELMD. JET CLEAN AT 1.5 BPM @ 1680 PSI. PULL UP HOLE AND STUCK CT @ 10243' CTD. REDUCE WHP AND INCR RATE TO FREE CT. RIH AND RETAG PBD AND JET CLEAN AT 1.5 BPM @ 1880 PSI. PULL UP HOLE AND STUCK CT AGAIN AT SAME SPOT. BLEED WHP AND CAME FREE. ACTED LIKE NOZZLE WAS HUNG ON A SHARP LIP BECAUSE WEIGHT FELL OFF QUICKLY. PARKED NOZZLE ABOVE THIS POINT @ 10200'. MIXED 80 BBLS CEMENT. BULLHEADED CEMENT DOWN CT AT 1.2 BPM @ 1800 PSI WHP. WHP CLIMBED STEADILY AFTER CEMENT WAS OUT NOZZLE. AT 12 BBLS OUT NOZZLE AND WHP 2430 PSI, SWITCHED TO DISPLACEMENT WATER, BUT THEN WHP QUIT CLIMBING. PARKED NOZZLE ABOVE SAG @ 10000'. HESITATED TWICE AND PLAYED WITH CEMENT FOR 40 MIN TRYING TO HOLD 2400 PSI, BUT BLEEDING BACK TO 1900 PSI. RESUMED PUMPING AND POOH TO ABOVE WCTOC WHILE GAUGING RETURNS AND LOSING ABOUT 1/2 HOLDING 2000-2400 PSI WHP. HESITATED TWICE MORE AFTER BRINGING WHP UP TO 2400 PSI, BUT EACH TIME IT WOULD BLEED TO 1960 PSI AND HOLD (ABOVE FRAC PRESS?). LRO'D FROM 8200-10000' AT REDUCED RATE AND WHP LETTING CEMENT SET UP DOWNHOLE. REVERSED CLEAN, THEN PRESSURE TESTED TO 1800 PSI. LOST 200 PSI IN 20 MIN, THEN HELD 1590 PSI FOR 10 MIN. JETTED LINER AND JEWELRY CLEAN TO 9320' AND THEN BACK TO 9990'. REVERSED CLEAN THEN POOH. LEFT 1000 PSI ON WELL. WOC. FLUIDS 305 BBLS SW TO LOAD WELL 103 BBLS SW 6 BBLS EW (PREFLUSH) 44 BBLS CEMENT 4 BBLS EW (SPACER) 40 BBLS SW (DISPLACEMENT) 201 BBLS SW (REVERSE OUT) 62 BBLS SW (JET PASS) 143 BBLS SW (FINAL REVERSE OUT) 34 BBLS MEOH (FREEZE PROTECTION CT) 0 BBLS MEOH (FREEZE PROTECTION WELL) WELL CLEANED OUT TO 10000' 8 BBLS CEMENT RECOVERED (DOES NOT INCLUDE CEMENT NOT PUMPED) CEMENT (B~]. SERVICES) 15.8 PPG CLASS "G" CMT CONTAINING, 0.35% FL-33,0.1% CD-32 0.48% R-11,1.0 GAL PER SK FP-6L ~a~l~ Uu ~ Gas Co~s Page 4 10/11/94 10/18/94 WELL R-29(23-31-12-13) The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60/120° phasing. 10210-10230"MD A HCL Acid Wash Treatment was performed using the following fluids: SUMMARY: Pigged coil with foam plug prior to running packer. Packer would not set. Experienced about 1000# overpull when pulling packer into setting position. Either this was enough to open spotting valve or there is trash on the ball seat. Surged fluid and coil w/o success. Did not want to risk tagging bottom and hanging up in tight spot at bottom of sqzd perfs. POOH to check BHA. Ball seat had blown out. Changeout packer. RIH. Set packer @ 10125'. Establish injection rate of 1.5 BPM @ 2100 psi. Pump 62 bbls 15% HCL thru packer treating the Ivishak perfs @ 1.5 BPM @ 1950 psi. Did not see any pressure decrease during acid displacement. Pull release packer and POOH. POP. BBLS. 237 60 30 FLUIDS PUMPED Filtered seawater 15% HCL MEOH RECEIV 'D ~nchor; , LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 26 April 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL R-28 (44-31-12-13 ~ DESCRIPTION PLS/STATIC FNL BL+RF PLS/STATIC FNL BL+RF PLS/STATIC FNL BL+RF PLS/STATIC FNL BL+RF PLS/STATIC FNL BL+RF PLS/STATIC FNL BL+RF ECC No. Run # 1 3334.04 Run # 1 3889.07 Run # 1 4515.05 Run ~ 1 5707.05 RUn # 1 5761.07 Run # 1 5823.02 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and Petro~echnical Da~e Center BP Exploration (Alaska) Ina 900 Eost Benson Boulevard Alaska 011 & Gas Cons. Commisslo. n Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE . AK, 99501. 'Date: 17 October 1994 RE: Transmittal of Data Sent by: U.S. MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL C-19 ~/~R-29 (23-31-12-13) # DESCRIPTION 1 PL/GASENTRY FINAL BL 1 PL/GASENTRY RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA C-05 (41-25-11-13) H-01 (41-28-11-13) 1 PL/GASENTRY FINAL BL 1 PL/GASENTRY RF SEPIA 1 PL/PROFILE FINAL BL 1 PL/PROFILE RF SEPIA ECC No. Run # 1 5746.03 Run # 1 Run # 1 5761.06 Run # 1 Run # 1 5809.04 Run # 1 Run # 1 5984.04 Run # 1 Please sign and retUrn to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 . Attn. Rodney D Paulson . ~ Or~F~ to (907i 563-7803 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 13 October 1994 RE: Transmittal of Data Sent by: U.S. MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 PL/STP FINAL BL 1 PL/STP FINL.RF SEPIA 1 PLS FINAL BL 1 PLS FINAL RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PL/STATIC FINAL BL 1 PL/STATIC RF SEPIA 1 PLS/STP FINAL BL 1 PLS/STP RF SEPIA 1 PLS FINAL BL 1 PLS FINAL RF SEPIA Run # 1 Run # 1 Run # 1 Run ~ 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 4529.03 4911.04 ' 5157.06 5761.05 6022.03 6075.06 ea ' s' a · as ' ' ervices 5600 B Street Suite 201 Anchorage, AK 99518 ~ Attn. Rodney D. Paulson ........ LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 3 October 1994 RE: Transmittal of Data Sent by: U.S. MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1PL/LEAKDET. FINAL BL 1PL/LEAKDET. RF SEPIA 1 PL/INJPROF. FINAL BL 1 PL/INJPROF. RF SEPIA 1 CCL/CHMCUTR FINAL BL 1 CCL/CHMCUTR RF SEPIA 1GR/CCL 9/26 FINAL BL 1GR/CCL 9/27 FINAL BL 1GR/CCL 9/26 RF SEPIA 1GR/CCL 9/27 RF SEPIA Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 5761.04 5951.01 5978.04 6277.00 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Received ~ 7/odney D. Paulson Date: PERMIT 92-061 92-061 92-061 92-061 92-061 92-061 92-061 92-061 92-061 92-061 92-061 DATA BHC/SL CNL/GR CNL/GR/CCL JWL PERF PFC/GR PISFL/GR PROD SSTVD AOGCC Individual Well Geological Materials Inventory T DATA_PLUS RUN 407 DAILY WELL OP 92-061 SURVEY 92-061 SURVEY 92-061 5403 92-061 6019 L 9941-10701 L 1800-10142 L 10000-10518 L 9550-10652 L 9650-10400 L PERF L 9941-10730 L CH L 9941-10701 R COMP DATE: 09/28/92 R 08/11-08/30/92 R 0-9896 R 0.00-10750 T 1792-10225 OH/FINALS T 9981-10514, CH-CN/GR 1 1 1 1 1 1 1 1 1 Are dry ditch samples required? yes 3~/~- received? yes Was the well cored?~~~~& description received? Are well tests ~o Received? yes no Well is in compliance Initial COMMENTS Page: Date: 1 09/28/94 DATE_RECVD 09/18/92 09/18/92 04/18/94 10/16/92 10/16/92 11/25/92 09/18/92 01/04/93 09/18/92 11/03/92 11/03/92 11/03/92 11/03/92 10/08/92 03/09/94 no yes no ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 10 August 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL W-18 (41-21-11-12) D-17 (14-23-11-13). DESCRIPTION 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 COLLAR LOG FINAL BL 1 COLLAR LOG RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA ECC No. Run # 1 6016.05 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 4535.01 6036.02 5967.01 5761.03 Please sign and return to: Atlas Wireline Services 5600 B Street RE¢.E VED Suite 201 Anchorage, AK 99518 AUG 1 ~ 19~4 / Rodney D. Paulson ---- Received by//~~///~~ Date: Please sign and return to: Petrotechnical Data Center BP Exploration (Alaska) Ine 900 East Benson Boulevard Anchorage, Alaska ~908 , , , mil ....... ,_. , i i mill I. ~ ............ _'.. . . Received b.V Date .............. ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 8 April 1994 RE: Transmittal of Data Sent by: U.S. MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION 1 PLS STATIC FINAL BL PLS STATIC RF SEPIA /ffCN/GR FINAL BLUELINE 1 CN/GR RF SEPIA ~Cq~'~l W-32 (32-16-11-12) 1 PDK/GR/CCL FINAL BL PDK/GR/CCn SEPIA ~ CN/GR FINAL BLUELINE 1 CN/GR RF SEPIA 1 CN/GR FINAL BLUELINE JI CN/GR RF SEPIA ~-'156/ W-31 (31-17-11-12) . . lCN/GR/CCL FINAL BL CN/GR/CCL RF SEPIA 1 CN/GR FINAL BLuELINE ~/1 CN/GRRF SEPIA · IPFC/CCL FINAL BL PFC/CCL RF SEPIA ECC No. Run # 1 4515.03 Run # 1 Run # 1 4112.02 Run # 1 Run # 1 3965.01 Run # 1 Run # 1 5665.03 Run # 1 Run ~ 1 6154.00 Run ~ 1 Run ~ 1 5761.02 Run ~ 1 Run ~ 1 5659.01 Run ~ 1 .. Run ~ 1' 3061.02 Run ~ 1 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: ·Date: t ECEIVED ,4PR 7 8 Alaska Oil a Gas Cons. Cat, mission Anchorage STATE OF ALASKA AL .~ OIL AND GAS CONSERVATION COMMIS. ~1 REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate__ Plugging__ Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 4648' SNL, 4344' WEL, SEC. 32, T12N, R13E At top of productive interval 3282' SNL, 2861' WEL, SEC. 31, T12N, R13E At effective depth 3134' SNL, 3219' WEL, SEC. 31, T12N, R13E At total depth 3111' SNL, 3276' WEL, SEC. 31, T12N, R13E 5. Type of Well: Development X 6. Datum elevation (DF or KB) KBE=51.5 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number R-29(23-31-12-13) 9. Permit number/approval number 92-61 / 10. APl number 50- 029-22275 Exploratory Stratigraphic Service 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length .. 110 3021 9929 measured true vertical 10750 feet 9177 feet 10670 feet 9119 feet Size 20 10 3/4 7 5/8 ._ 1027 5 1/2 10160'-10180' 10180'- 10200' subsea 8749'-8763' 8763'-8778' Tubing (size, grade, and measured depth) Plugs (measured) Junk (measured) Cemented 2163/399 c.f. AS III "G" 1173/215 c.f. Neat "G" 160 c.f. Class "G" 4-1/2" TDS @ 9741'MD Packers and SSSV (type and measured depth) Packer 9695' MD, SSSV2084'MD Measured depth 140 3051 9959 9723-10750 True vertical depth BKB 140 3029 8575 8393-9155 R C E IV 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1480 1522 I 1280 2860 2633 47 950 Tubing Pressure 253 266 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended__ Service 17. I here~.~by_~rtify that.the forego,~ true and correct to the best of my knowledge. SignedC. ¥ .4,~.,~,4~ k/,~ ,~'¢-~ Title Senior TechnicalAssistantl Form 10-40-4} Rev 06/15/88 SUBMIT IN DI~PLI(~AfE 11/10/92 WELL R-29(23-31-12-13) Addperf The following interval were added using 3 3/8" guns, 6 SPF, random orientation and 60°/120° phasing. 10240'- 10260' MD 10220'- 10240' MD 10210'- 10220' MD fjh 5/20/93 ~ ECE I~,~ED Alaska Oit&., ~ia~; Co~s. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P,O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 12/21/92 T# 84196 BP CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. --,/PFC 12/14/92 #1 F-24 ~.-:~'"/'~Y'PRODUCTTON LOG 12/16/92 #1 R-11 ~$'"3 PRODUCTION LOG 12/16/92 #1 R-297;.~/ PRODUCTION LOG 12/14/92 #1 10900.00-11250.00 ATLAS 5 " 10800.00-12250.00 ATLAS 5 " 10090.00-10473.00 ATLAS 5 " 10000.00-10400.00 ATLAS 5 " information Control Well Records RECEIVED JAN 0 4 1993 Naska 011 & Gas Cons. Commission Anchorage BP EXPLORATION RECEIVED BP Exploration (Alaska) Inc, 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 11/16/92 T~ 84059 BP LOGS Endlosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A-12 ~"'(~ PRODUCTION LOG 11/07/92 ~1/ 8750.00- 9250.00 ATLAS 5 " A-t8~;-fo~ CCL(C~,~ ¢~r~,~1/10/92 #1~/ 8100.00- 9270.00 ATLAS 5 " B-218Z-I?~ PFC/~(~4~F) 11/_Q9/92 #1~ 9400.00- 9824.00 ATLAS 5 " M-15~/-~'~CCL {~K-,~/~,a~/~8/92 #1~ 8500.00- 9330.00 ATLAS 5 " R-29~-~/. PFC/~ (~FR~) 11/10/92 #1v~ 10140.00-10320.00 ATLAS 5 " R-30 ~-~ PRODUCTION LOG _ 11/08/92 #1 v/ 11100.00-11550.00 ATLAS 5 " S-07A~,~ ~F. iDC~_ TLUC (f~$)' 11/11/92 #1~/ 9620.00- 9720.00 ATLAS 5 " Information Control Well Records ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 NOVEMBER 3, 1992 MARION SLOAN BP EXPLORATION ALASKA INC. P O BOX 196612 ANCHORAGE, ALASKA 99518-6612 RE: 92-0061 PRUDHOE BAY UNIT R-29 COMPLETION REPORT 92-0074 PRUDHOE BAY UNIT R-30 COMPLETION REPORT 92-0069 PRUDHOE BAY UNIT DS18-9A COMPLETION REPORT 92-0078 PRUDHOE BAY UNIT DS15-30 COMPLETION REPORT DEAR MARION SLOAN, OUR FILES INDICATE THAT ARCO ALASKA AND BP EXPLORATION ALASKA INC. IS THE OPERATOR OF THE REFERENCED WELLS. THESE WELLS HAVE REPORTED PRODUCTION TO US AND WE HAVE NOT RECEIVED THE APPROPRIATE COMPLETION REPORTS (407 FORMS) TO DATE. SEPTEMBER MONTHLY PRODUCTION PREPORTS INDICATE THAT THESE WELLS ARE 0IL PRODUCER FOR THE YEAR 1992. WE HAVE NO PAPER WORK SHOWING THE COMPLETIONS FOR THE WELLS OR PLUGGING AND ABANDONMENT OF THE ORIGINAL WELL. I AM FORWARDING THIS LETTER AS A RECORD FOR YOU AND ME. THANKS FOR YOUR QUICK RESPONSE ON THESE REPORTS. SINCERELY, STEVE MC MAINS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CO,v, MISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL I[~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 92-61 3. Address B. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22275 4. Location of well at surface 4648' SNL, 4344' WEL, SEC. 32, T12N, R13E !~--' "~';'::;.:..i,,,-~ ......} Prudhoe Bay Unit 3282' SNL, 2861' WEI~ SRO. 31, T12N, FI13E~ ~-'~ ~~ ~£~..~r-~, ~~ i F1-29 (23-31-12-13) · ~ ~~ ~ ~--'~ ..... ~ . 11. Field and Pool At Total Depth ~ ........................ ~-~ Prudhoe Bay Field/Prudhoe Bay Pool 3111' SNL, 3276' WEL, SEC. 31, T12N, R13E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 51.5 I ADL 28279 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. er Aband. 115. Water Depth, if offshore 116. No. of Completions 8/11/92 8/23/92 9/28/92I N/Aeet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD] 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 10750'MD/9177' TVD 10670' MD/9119' TVD YES E] NO []I 2084¢eet MD / 1900'(Approx.) 22. Type Electric or Other Logs Run Run #1 GR/SP/DI/SFL/BHC/CNL Run #2 GR/SP/Di/SFL/BHC/CNL 23. CASING, LINER AND CEMENTING RECORD SETI'ING DEPTH MD CASING SIZE w'r. PER FT. GRADE TOP BOTrOM HOLE SIZE CEM~ RECORD AMOUNT PULLED 20 Cond. H-40 Surface 80° 30" 10-3/4 45.5# NT-80 Surface 3051' 13-1/2" 2163 cu ft AS 111/399 cu ft Class "G" 7-5/8 29. 7# L-80 Surface 9959' 9-7/8" 1173 cu ft "G"/215 cufl Neat "G" 5-1/2' 17# 13CRFL4S 9723' 10750' 6-3/4" 160 cu ft Class "G" 24. Pedorations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Gun Diameter 3-3/8" 6 spf 4-1/2", TDS 9741 'MD 9695'MD MD TVD 10160'-10180' 8749'-8763' 10180'-10200' 8763'8778' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 9/28/92 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE StZE IGAS-OIL RATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED..~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submil core chips. RECEIVED ^nehora o Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate La. 30. GEOLOGIC MARKERS , ,.~{MATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sag River 10017' 8641' Top Shublik 10067' 8679' Top Sadlerochit 10159' 8748' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~_.~5,~~~ ~:)'-~.L ~r-¥~, Title WorkoverEn~_ineerSuoervisor Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. J~ ~ E E IV E D Item 28: If no cores taken, indicate "none". OV - 992 Form 10-407 Alaska Oil & Gas Cons. Commission Anchorage BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: R-29 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50-029-22275 PERMIT: APPROVAL: ACCEPT: 08/11/92 11:08 SPUD: RELEASE: 08/29/92 11:08 OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 08/11/92 ( 1) TD: 110'( 0) PREP LOCATION MW: 0.0 VIS: 0 MOVED OFF R-30. BLADE R-29 LOCATION. SET MATTING BOARDS. 08/12/92 (2) TD: 950' ( 840) 08/13/92 (3) TD: 3065'(2115) DRILLING MW: 8.9 VIS:300 ACCEPT RIG AT 11:00 8/11/92. DRILL TO 496'. GYRO SURVEY. DRILL TO 950' TRIP IN HOLE (WIPER TRIP) MW: 9.6 VIS:300 DRILL AND SURVEY TO 3065'. CBU. POOH. TRIP IN HOLE. 08/14/92 ( 4) TD: 3065' ( 0) 08/15/92 ( 5) TD: 4300'(1235) 08/16/92 (6) TD: 5750'(1450) 08/17/92 ( 7) TD: 7245'(1495) 08/18/92 (8) TD: 7630'( 385) 08/19/92 (9) TD: 7630' ( 0) NIPPLE UP BOPE MW: 9.6 VIS: 63 TIH. CIRCULATE. DROP GYRO. POOH. RUN 10-3/4 SURFACE CASING. CIRCULATE & RECIPROCATE 10-3/4 CASING. CEMENT CASING. NU BOPE. DRILLING MW: 9.6 VIS: 37 NIPPLE UP BOPE. TEST BOPE. TIH. CBU. TEST CASING. DRILL CEMEMT TO 3039'. CBU. TEST CASING. NEW HOLE TO 3075'. CIRCULATE. DRILL TO 4300'. DRILLING MW: 9.7 VIS: 38 DRILLED TO 4542' CBU. DRILL TO 5021' CIRCULATE SWEEP. DROP SURVEY. PUMP DRY JOB. DRILL W/BIT #3 TO 5750'. DRILLING MW: 9.8 VIS: 42 DRILL TO 5230'. CIRCULATE SWEEP. SHORT TRIP. DRILL TO 7245' TRIP (MWD FAILURE) MW: 9.7 VIS: 40 DRILL TO 7533'. CIRCULATE. DROP SURVEY & PUMP DRY JOB. POOH. TIH. WASH & REAM TO BOTTOM. DRILL TO 7630' CIRCULATE. CHECK MWD. POOH. RIH TO BOTTOM. DRILLING MW: 9.9 VIS: 38 DRILL TO 8650' SHORT TRIP. DRILL TO 9187. RECEIVED NOV - ;5 'J992. Alaska Oil & Gas Cons. Commission Anchorage WELL : R-29 OPERATION: RIG : NABORS 28E PAGE: 2 08/20/92 (10) TD: 9970' (2340) 08/21/92 (11) TD: 9970' ( 0) 08/22/92 (12) TD:10150' ( 180) 08/23/92 (13) TD:10750'( 600) 08/24/92 (14) TD:10750' ( 0) 08/25/92 (15) TD:10750' ( 0) 08/26/92 (16) TD:10750' ( 0) 08/27/92 (17) TD:10750' ( 0) 08/28/92 (18) TD:10750 PB:10670 08/29/92 (19) TD:10750' ( 0) RUNNING 7-5/8 CASING MW: 9.8 VIS: 37 DRILLING TO 9970'. SHORT TRIP. CBU. DROP & PUMP PILL. POH. TEST SEALS. RU & RUN 7-5/8 CASING.. RIH. MW: 8.8 VIS: 34 RIH W/ 7-5/8" CSG. CIRC. CMT CSG. L/D LAND JT. INSTALL PACKOFF. TEST BOPE. C/O KELLY. RIH W/ 3-1/2" DP. DRILLING MW: 8.8 VIS: 38 RIH W/3-1/2" DP, TAG CMT @ 9860', DRILL OUT HARD CMT TO FLOAT COLLAR @ 9877', CIRC, TEST 7-5/8" CSG TO 3000 PSI, DRILL OUT FC @ 9877' & HARD CMT TO 9941', CIRC & COND. MUD, TEST SCG TO 3000 PSI, DRILL OUT HARD CMT & SHOE TO 9970' & 6-3/4" HOLE TO 10150' POOH. MW: 8.8 VIS: 40 DRLG F/ 10150'-10750' TD WELL @ 01:30 HRS, 8/23/92. CIRC. SHORT TRIP TO ~HOE. CBU. POOH. REAM. MW: 8.8 VIS: 38 POOH. R/U SWS. LOG RUN 91: GR/SP/DI/SFL/BHC/CNL. HIT BRIDGE @ 10195' RIH TO 9833'. CIRC. HIT BRIDGE @ 10200'. REAM F; 10890'-10750' CBU. POOH. R/U SWS. LOG RUN #2: GR/SP/DI/SFL/BHC/CNL. HIT BRIDGE @ 9963'. POOH. R/D SWS. RIH TO 9958' REAM F/ 9950'-10068' DRLG. REAM F/ 10036'-10080' REAM F/ 10080'-10120' MW: 9.0 VIS: 42 CIRC. POOH. CHANGE BIT. RIH. DRLG NEW HOLE F/ 10120'-10478' POOH. MW: 9.6 VIS: 44 DRLG NEW HOLE F/ 10478'-10750'. CIRC. POOH TO SHOE. RIH. CBU. POOH 2 JTS. CIRC. POOH. SHORT TRIP TO SHOE. CBU. POOH. RIH W/ 5-1/2" LNR. MW: 9.6 VIS: 45 POOH. R/U SWS. LOG RUN: GR/SP/DI/SFL/BHC. F/ 10195'-10147'. R/D SWS. RIH. CIRC. POOH. RIH W/ 5-1/2" 13 CR LNR ON DP. L/D BHA. MW: 8.4 Seawater RIH W/ 5-1/2" LNR. CIRC. CMT CSG. SET HGR, PKR. RELEASE F/ LNR. POOH. L/D RUNNING TOOL. RIH W/ MILL, CSG SCRAPER. TAG LC @ 10668' CBU. TEST CSG. DISP WELL TO SEAWATER. POOH TO TOL. CIRC. POOH. L/D DP. NIPPLE UP TREE MW: 0.0 ViS: 0 RECEIVED NOV - 1992 Alaska Oil & Gas Cons. Gorm-nissio~'~ Anchorage WELL : R-29 OPERATION: RIG : NABORS 28E PAGE: 3 08/29/92 (20) TD:10750 PB:10670 08/30/92 (21) TD:10750 PB:10670 NIPPLE UP TREE MW: 8.4 Seawater LD BHA. RUN 4-1/2 COMPLETION. LAND TUBING HANGER. SET 7-5/8 PACKER. TEST TUBING. TEST ANNULUS. ND BOPE & NU TREE. RIG RELEASED MW: 8.4 Seawater NU & TEST TREE. PUMP DIESEL DOWN ANNULUS FOR FREEZE PROTECTION. SET BPV. SECURE WELL. RELEASE RIG 11:00 8/29/92. SIGNATURE: (drilling superintendent) DATE: RECEIYED NOV - ~ 199~ Alaska Oil & Gas Oons. Gom~isslO~ Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 10/13/92 T% 83973 BP CH Logs Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ~ R-29 ~%'~ CH 09/27/92 REF~ R-29 CH 09/28/92 REF~ IR-30 ~ CH 09/25/92 REF# R-30 ~'q CH 09/24/92 REF# PDC & JEWELRY LOG GAMMA SCH PERFORATING RECORD 3 3/ SCH PERFORATING RECORD 3 3/ SCH PDC & JEWELRY LOG GAMMA SCH Information Control Well Records / RECEiYED OCT 1 6 1992 Alaska 0ii & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 10/08/92 T# 83939 Replacement Tape for R-29 Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ~~': R~29 OH/BCS/DTE&CNTH REF#92527 1792.50-10225.50 API#500292227500 FIN 08/26/92 #1 1600BPI 9038->TP# Data was missing from the first tape. SCH / ECEIVED OCT 1 5 1992 Information Control Well Records Alaska 0il & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 09/30/92 T# 83939 BP MAGNETIC LIS TAPE Enclosed is your copy of the materials listed below. questions, please contact BP Well Records at (907) R-29 OH/BCS/DTE&CNTH FIN 08/26/92 1792.50-10225.50 1600BPI API#500292227500 9038->TP# If you have any 564-4004. #1 SCH REF#92527 Information Control Well Records Shirley Hale . ' RECEIVED OCT 0 8 1992 Alaska 0il & Sas Cons. Commission Anchorage AOGCC GEOLOGICAL MATERIALS iNVENTORY LiST PERMIT # .. ~ - ~/ WELL NAME /C~ /~.... ~ COMPLETION DATE ~' ]?_~_~ ~-'~ CO. CONTACT ,~/~,~ check' off or ii's~ data aS' i~' iS recoil'ed.*list rec~'ived date for 4D7. if cored intervals ii core a,,nal,vsis j,q/R i i iiii iii ii iiiiiiiii ii iii ii i i ii ii i i i dry ditch intervals ~r, not re~l,,uired Ii'st as ~R w~! core descripti°r~,v~ digital data , ,5-'~$ ~'H) . . I" , '"-~,,~r'.=' .... t' RUN "',kl-~cn',,~,'.o SCALE ..... LO~l I I r'L 11111 I L~I,¥,'~L,~ NO. i i 71' '/ 'ill ....... , ~1 ............................ , , , 151· i t~l ..... ' ............. ' ......... i8i ..................... i Jl i ii i1[ i i i ii i ii ii i iiiiii BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 09/12/92 T# 83885 BP OPEN HOLE FINALS Enclosed is your copy of the materials listed questions, please contact BP Well Records at (907) CNLj 08/23/92 #1 BHCS/ 08/26/92 #1 SFL// 08/26/92 #1 Information Control Well Records Adrian J. Martin below. If you have any 564-4004.. 9941.00-10730.00 SCH 1800.00-10142.00 SCH 9941.00-10701.00 SCH 9941.00-10730.00 SCH 1/2" 2/5" 2/5" 2/5" / RECEiVED SEP 1 8 1992 Alaska 0il & Gas Cons. Commission Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR ,.. 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 June 25, 1992 Karen M Thomas Senior Technical Assistant BP Exploration PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit R-29 BP Exploration Permit No: 92-61 Sur. Loc. 4648'SNL, 4344'WEL, Sec. 32, T12N, R13E, UM Btmhole Loc. 3260'SNL, 3217'WEL, Sec. 31, T12N, R13E, UM Dear Ms. Thomas: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in aCcordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairman BY ORDER OF THE COMMISSION dlf/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ,~-'., STATE OF ALASKA ~' ALASKA ~...,, AND GAS CONSERVATION CO,. AISSION PERMIT TO DRILL 20 AAC 25.005 la. Type 0i work Drill [] RedrillDIlb, Type of well. ExploratorylZ! Stratigraphic Testl"l Development OilE] Re-Entry [] ~nr-!I Service [] Development Gas [] Single Zone [] Multiple Zone [] , 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 51.5feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28279 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) 4648' SNL, 4344' WEL, SEC. 32, T12N, R13E Prudhoe Bay Unit At top of productive interval 18. Well number Number 3360' SNL, 2900' WEL, SEC. 31, T12N, R 13E R-29 (23-31-12-13) 2S 100302630-277 At total depth 9. Approximate spUd date Amount 3260' SNL, 3217' WEL, SEC. 31, T12N, R13E 7/14/92 $200,000.00 12. Distance to nearest i13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 28257/1665' feet R-2/ 34.9' @ Surface feet 2560 10718'MD/9150'TVDfeet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ,,,Ac 25.035 (e)(2)) Kickoff depth 3~oo'feet Maximum hole angle 3~.74 o Maximum surface 3330pslg At total depth (TVD) 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" Cond. H-40 Weld 80' Surface 80' 80' ~ 13-1/2" 10-3/4" 45.5~ L-80 Butt 3030' Surface 3030' 2980' 1820 cu ft AS 111/400 cu ft "G" 9-7/8" 7-5/8" 29. 7# L-80 NSCC 9946' Surface 9946' 8555' 1350 cu ft "G"/150 cu ft Neat "G" 6-3/4" 5-1/2" 17# 13crNT8~ NSCC 1022' 9696' 8321' 10718' 9150' 200 cuft Neat "G" ,, ....... 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth' measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface RECEIVED Intermediate Production ':Liner JUN 1 5 ]992 Perforation depth: measured true vertical ._Naska Oil & Gas Cons. CommiSSiOn .... rA n,~hnrg~lCi 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] DrilJ~'g""~'r~?am [] Drillin~ fluid procjram [] Time vs depth pict [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby ce~fy that the foregoing is true and correct to the best of my knowledge Sign~,/.._.- '/" ~..L-'-7~ ,~.- ~-. Title Senior TechnicalAssistant D at e,.. ~::~/~/~j~ // Commission Use Only P~'rmit Number IAPI number IApproval date ISee cover letter ' ~'.,7_. -~' / {5 0- o.z_ ?- z- 2_ 2_ ~,.5' J ~ '-' ¢~-'- ~,~2, Jfor other requirements Conditions of approval Samples required ' [] Yes J~No Mud Icg required []Yes/]~ No Hydrogen sulfide measures [] Yes ,]~ No Directional survey required ~ Yes [] No Required working pressure for BOPE' []2M; 1-13M; ~5M; r-I1OM; I-]15M; Other: Original Signed BY by order of Approved by David W. Johnston Commissioner ,ne comm,ssion Date Form 10-401 Rev. 12-1-85 Submit in triplicate PROPOSED DRILLING AND COMPLETION PROGRAM WELL R-29 [23-31-12-13] PBU Install and cement 80' of 20" conductor to surface. Diverter system will be installed. The Drilling fluid program will consist of an 8.5 - 9.5 ppg spud mud in the 13- 1/2" hole, a 9.0 - 9.7 ppg water base mud in the 9-7/8" hole and an 8.7 ppg water based mud in the 6-3/4" hole. Drill 13-1/2" hole to 3050' MDBKB. Run and cement 10-3/4", 45.5#, L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. A formation leak'off test will be Performed 10' below the 10-3/4" shoe. '. Directionally drill 9-7/8" hole to the 7-5/8" casing point above the top of Sag River Sandstone. Run a 7-5/8", 29.7 # NSCC casing string to within 10' of 9- 7/8" TD and cement with Class G cement around the 7-5/8" shoe (cement volume to cover Ugnu formation by 500'). The annulus will be freeze protected by dead crude oil. Directionally drill the 6-3/4" hole to TD. Run 5-1/2" liner from TD to 250' inside 7-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" float equipment. Change over to NaCI completion fluid. Test casing and lap to 3500 psi. Run 7-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Freeze protect the tubing and tubing annulus by evacuating the liquid utilizing gas lift throught the first gas lift valve at 3000' TVDBKB. Freeze protect the 10-3/4"-7-5/8" by dry crude to 2300' TVDBKB. Set and test packer. The well will be perforated after the rig has been released. Fluids incidental to the drilling of a well will be hauled to a central injection facility at CC2. Tubing Size: 4-1/2", 12.6 # NT13CR-80, Fox tubing with 6 GLM's. RECEIVED JUhi 1 5 1997. Alaska 0ii & Gas Cons. '.Anchqrage. PRELIMINARY WELL PLAN Well: R-29 [23-31-12-13] PBU LOCATION: Surface: Target: T.D.: 4648' SNL, 4344' WEL, Sec. 32, T12N, R13E 3360 SNL, 2900' WEL, Sec. 31, T12N, R13E 3260' SNL, 3217' WEL, Sec. 31, T12N, R13E ESTIMATED START: OPR. DAYS TO COMPLETE: July 14, 1992 18 (14 days drilling, 4 days completion) CONTRACTOR: Nabors 28E MAX ANGLE/SECT COURSE/KOP/BUILD RATE: 39.74o/ N 72.4° W/3100'/2.5 Item TVDs$ MD(BKB) Mud Wt. 20" CONDUCTOR 10-3/4" SHOE BASE WEST SAK FORMATION 7-5/8" SHOE TOP SAG RIVER SANDSTONE CURRENT GOC TOP SADLEROCHIT TARGET TOTAL DEPTH 80 8.5 298O 3O30 9.5 5480 5947 9.7 8555 9946 9.7 8555 9950 8.7 Above Sad 8685 10115 8.7 8748 10196 8.7 9150 10718 8.7 Note: Estimated Ground level elevation is 19.5' AMSL. KB to ground level elevation is approximatly 32'. LOGGING PROGRAM: Open Hole - Record all logs on magnetic tape where applicable. 9-7/8" Hole: None 6-3/4" Hole: DIL/CNL/GR/SP/SDT, Optional: LDT/GR, RFT Cased Hole Gyro survey after rig release. SS: 6/14//92 RECEIVED JUN 1 5 199~- Oil & Gas Cons. Com~'tss'to~ , ~nchorag~. MUD WEIGHT WELL R-29 CALCULATIONS (23-31-12-13) Mud Wt. (6-3/4" Hole): 8.7 ppg. P Sag River: P Sadlerochit: P Top Sadlerochit: 3630 psi. 3660 psi. at 8800' TVDSS 3623 psi. OB Sag River: OB Top Sadlerochit: Current GCC: 260 psi. 330 psi. Above Top Sadlerochit 7-5/8" Casing Pt. Top Sag River Top Sadlerochit 8607' TVDBKB 8607' TVDBKB 8737' TVDBKB Cement Calculations 10-3/4" CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 3030' 2 X Annular volume 2220 (cu ft) 1820 (cuft) 1075 Sx Arcticset III @ 1.94 Cu ft/Sk 400 (cuft) 350 Sx class G cement @ 1.14 Cu ft/Sk 7-5/8" CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry VOl: 9946' 90% Annular Volume of 12-1/4" hole + 50 cu ft 1500 (cu ft) 1350 (cu ft) 500 Sx G+8% @ 2.75 Cu ft/Sk 150 (cuft) 129 Sx Neat G @ 1.15 Cu ft/Sk Ugnu (shallowest hydrocarbon zone) will be covered by at least 500' of cement (at top). 5-1/2" LINER Measured Depth: Basis: Total Cement Vol: 9696' (Hanger)- 10718' (Shoe) 1.5 X Annular volume to 7-5/8" shoe + 100 cuft 200 (cuft) 172 Sx Neat G @ 1.16 Cu ft/Sk SS: 6/14//92 Mt,ID PROGRAM: Well h-29 The mud program for this well shall follow the new Mud Policy, The following are the re~mmended mua parameters, MUD SPECIFICATIONS-__.SURFACE HOLE Mud Weight: ppg Funnel Vlsc~slty 10 sec Gel 10 rain Gel pH . APl Fluid lOSS mil30 min Hardness m g/I sec/qt ]bs/lOOft2 Ibs/100ft2 lbs/1 00ft2 Sumacs: Casino oolnt: -- - 8,5 - 9.5 8,5- 9.0 ~800 < 1 O0 40 - G0 P.0 - 40 30 - 60 15 - 20 '60 - 80 20 - 30 9- 10 9- 10 15-25 15-25 < 200 <200 MUD SPECIFICATIONS..INTERMEDIATE HOLE Surface casing shoe to Top of ,Sag River Sandstone (~9950' MDBKB): LSND Gel/Water System Mud Weight ppg 9.5- 9.8 Yield P(~lnt Ibs/100ft2 10 . 15 10 sec Gel Ibs/100ft2 5 -'10 10 rain Gel Ib$/10Oft2 10 -20 APl Fluid Loss mi/30 rain <15 pH -- 9,5 - 10.0 Hardness m g tl NC.no control (To contel Cretaceous overpress, as well as shales) MUD SPECIFICATIONS.PRODUCTION INTERyAL; Watered 13ack mud system used In Intermediate. hole, Mud Weight p~ 8,7 Yield Point Ibsll00ft2 8 - 13 10 sec Gel Ib$/100ft2 5 - 10 10 rain ~el Ibs/10Oft2 7 - 15 APl Fluid loss mil30 rain 6.0 - 8.0 .- l-lardnes~ m g/i t r < 4000 Gas Cons. Commission Anchorage The mucl salinity must be compatible with the Resewolr logging program, The mud should be run at < 3600 ppm ohlerldee {that Is fresh water e, ouroe). Over Ba_!ance.' in /he Production Hale Design Mud Wt. (§-3/4" Hole): 8,7 ppg. Formation pressure at top Sag River: Formation pressure at Sadlerochit: Pressure al top Sadleroc=hlt; 3623 psi, 3630 psi. 3660 psi at 8800' TVDSS Over I~alanoe Sag River: Over Balance Top Sadlerochit: Current GOO: 200 pal. 330 pal. A~ve lop Sacl. (,Sag may I~e unaerpresaureel) NABORS 28E DIVERTER SYSTEM ARCO ALASKA, INC. FILL-UP UNE i RISER FLOWMNE I lg' BALL VALVE I lg' BALL VALVE RECE]VE~ I coNDUcTOR ] I Alaska Oil & Gas Cons, Comr~ Anchorage. ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE ~ VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND VENT UNE. THE SECOND VENT MNE VALVE CAN BE OPEFED USING CONT'FIOLS LOCATED AT THE ACC'qJMULATOFL THIS IS THIS IS A VARIANCE FROM 20AAC25.035. RESERVE PIT 10" VENT LINE 10" VENT UNE DNE~i ~ uNES DISCHARGE 100 FT. FROM RIG IGNITION SOURCE. ALL TURNS ARE TARGETED TEES. BOP STACK CONFIGURATION ATTACHMENT II 13 5/8", 5000 PSI WP TRIPLE RAM STACK WORKO VER RISER i, ANNULAR PREVENTER 2" KILL LINE PI PE RAMS I PI PE RAMS i MANUAL HYDRAULIC GATE GATE DRILLING SPOOL i BLIND RAMS 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE RECEIVED Alaska Oil &.?Cs Cons. Commission. ~,rlchorage ' Search Radius= 200 7 DEGREE LEAD LINE For proposed well: R-29 [23-31-12-13] Location = W-E S-N TVD(SBS) Top 634586.00 5977098.00 -52.00 Bottom 630371.14 5977883.93 9034.00 Note: Ail depths in feet Below Kelly Bushing (BKB) Date: 14-JUN-92 Time: 11:01:12 Closest Approach WELL IDENT /PROPOSED~ /NEARBY~ CLOSEST TVD DEPART TVD DEPART DISTANCE A029-2010500 M-4 A029-2035300 R-1 A029-2035400 R-2 A029-2036400 R-3 A029-2052300 R-7 A029-~2054500 R-8 A029-2089300 R-ii A029-2090900 R-14 A029-2091700 R-15 A029-2099700 R-21 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 2497 6 0 0 1496 8 3816 8 3051 1 3399 1 6333 0 3299 7 0.0 00 O0 115 5 00 19 6 1999 0 8.7 2499 8 2 9 1499 9 3805 3 3047 5 3375 4 6471 9 3335 9 11 5 0 0 13 9 38 8 402 3 611 6 2619 9 303 7 65 1 34 9. 139 5 127 4 425 0 444 5 235 8 1082 6 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW SUMMARY The well which comes closest to the proposed well is: A029-2035400 R-2 Closest approach distance = 34.9 feet KICK OFF for this run = 3100.0 feet Vertical Intersection /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART VERTICAL DISTANCE 6391.0 2047.3 6805.6 2853.5 413.1 Search Radius= 200 COURSE LINE For proposed well: R-29 [23-31-12-13] Location = W-E 'S-N TVD(SBSI Top 634586.00 5977098.00 -52.00 Bottom 630498.34 5978391.74 9034.00 Note: Ail depths in feet Below Kelly Bushing (BKB) Date: 14-JUN-92 Time: 11:02:59 Closest Approach WELL IDENT /PRoPOSED~ /NEARBY~ CLOSEST TVD DEPART TVD DEPART DISTANCE A029-2035300 R-1 A029-2035400 R-2 A029-2036400 R-3 A029-2052300 R-7 A029-2054500 R-8 A029-2063700 R-19 A029-2064100 R-20 A029-2089300 R-11 A029-2090900 R-14 A029-2091700 R-15 A029-2099700 R-21 SUMMARY 2497.6 0.0 2499.8 11.5 65.1 0.0 0.0 2 .9 0.0 34 .9 1496.8 0.0 1499.9 13.9 139.5 3775.3 102 o0 3766.5 32.7 139.7 3051.1 0.0 3047. 5 402. 3 425o0 NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 4198.6 281.1 3968.6 908.6 1442.0 3399.1 19.6 3375.1 611.6 443.3 5868.6 1613.0 5961.5 2245.3 152.5 3299.7 8.7 3335.9 303.7 1081.6 3498.0 34.8 3645.2 1329.0 1150.9 The well which comes closest to the proposed well is: A029-2035400 R-2 Closest approach distance = KICK OFF for this run = 34.9 feet 3100.0 feet Vertical Intersection /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART VERTICAL DISTANCE 5861.3 1606.9 6118.1 2361.9 255.3 $45DUA247:[DRAN033]R29 GEO.LIS;3 14-JUN-1992 11:02 well= R-29 [23-31-12-13] Marker File DRAN033 / 14-JUN-92 /11:02:04 Label TVD TVD MD DEPART INC SS BASE PERMAFROST 1850. KOP 01 3048. TOP UGNU SANDS 3900. END OF BUILD ~1 4513 BASE WEST SAK FORMATION 5480 IKRU-PBU 6850 TOP SAG RIVER SANDSTONE 8555 CURRENT GOC 8555 TOP SHUBLIK FORMATION 8596 TOP SADLEROCHIT 8685 TARGET 8748 CURRENT OWC 8870 TOP HOT 8968 ORIGINAL OWC 9034 TOP EILEEN SANDSTONE -1 KAVIK (BASE SADLER) -1 (BKB) 1902 3100 3952 4565 5532 6902 8607 8607 8648 8737 8800 8922 9020 9086 0 0 1902. 3100. 3973. 4689. 5947. 7729. 9946. 9946. 9999. 10115. 10196. 10355. 10483. 10568. 0. 0. 0o 0. 164o 529. 1333 2472 3890 3890 3924 3998 4050 4151 4233 4288 0. 0. ANGLE 0.00 0.00 21.82 39.74 39.74 39.74 39.74 39.74 39.74 39.74 39.74 39.74 39.74 39.74 0.00 0.00 I'IPiT U/4 ~Z ~ -/U INO .UUI h' .U/' ' R2B R7 R1 · R29 .%° , ~1 ~4 · REcrclV'ED THIS SURVEY VICINITY MAP I ,- N,I.S. SURVEYOR'S CER11FICATF. I HEREBY CE~11FY THAT I AM PRO- PERLY REGISTGR£D AND LICENSED TO PRACT1C[- LAND SURVEYING IN 'fi-ir STATE OF ALASKA AND 1HAT mis PI. Al REPRESENTS A SURVEY MADE: BY ME OR U~DSR MY DIRECT SUPERVISION ANO THAT ALL DI~EN- SIONS AND OlHER DETAILS ARF CORRgOT AS OF APRIL 28, LEGEND · EXISTING WELLS. ,~ CONDUCTOR AS-BUll T '11,115 5UNvEY. LOCAII:D WITHIN PROTRACTEO SECTION 32. T12N, RI3E, UUIAT MERIDIAN, ALASKA WELL A,S,P, PLANT C, EOOETIC Gt~OUND LOC:AT]ON NO. COOROS, COOROS, POSITION ELEV, IN $[CllON 5, g77,638,93 N 1504.11 70'20'48,463" 18.9 1155' R-25 635,,~57.21 E 23,30.49 14854'13t.41t' 1817' FWL ... --. 597704.9,16 N 2694.98 ?0'20'42.555' ,=,85' FSL R-28 634,371,I8 E 1999.84 $48-'-54'33.451" 19.2 718' F~. ........ 5,.ii77,098.2§ N 2474.40 70'20'43.:500' 630' FSL R-29 634,5B6.21 E lg99.35 148'54'27.143" 11~1.5 9'q4' FWt. ........... 5,977,114,58 N 2404.57 70'~0'43.447" 645' R-30 634,G54.15 E 1999.80 148'54'25,149' 19,6 IOOY FWL .. · 5,977,123,30 N 2364,24 70'20'43,527" 653' FSL R-31 $34,6§3.48 E 1999.66 14854?.3.§§6' 19,2 1042' FWL .......... ,, ISSUED FOR INFORMATION REVISIONS NOTES_ 1. COOROINATEC~ SHOWN ARt. ALASKA SLATE PLANE ZONE 4, NAD 2 RA.~IS OF WELL LOCATIONS A5 P{:R R PAD MONUMENTS k-1 AND R-,2. , .~, REFERENCE FIELD BOOK; WOA 4. DATES OF SURVEY: APRIL 2~-22, ~g92, 5, ASP GRID SCALE FACTOR = 0.9999209 F. ROBERT BELL &:: ASSOC. I BP EXPLORATION,_. DRAWING NAM[' R-PAD CONDUCTOR AS-BUILT WELLS R25, R28, R29, R30 CXDD FILl. EPAD25AB $45DUA247:[DRAN033]R29 >tS~RK.LIS;i t4-JUN-!992 11:16 Page i $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ PRUDHOE BAY UNIT DRAN033 / 14-3UN-92 //11:16:47 MARKERS FOR WELL R-29 [23-31-12-13] ENGINEER: Saad Sa!eh Label TVD TVD MD DEPART INC SS BASE PERMAFROST 1850. 10 3/4" SHOE 2978 13-1/2" hole 2998 KOP ~1 3048 TOP UGNU SANDS 3900 END OF BUILD ~1 4513 BASE WEST SAK FORMATION 5480 IKRU-PBU 6850 PACKER 8324 TOP 5 1/2" LINER 8363 TOP SAG RIVER SANDSTONE 8555 CURRENT GOC 8555 7-5/8" casing 8555 9-7/8" hole 8558 TOP SHUBLIK FORMATION 8596 TOP SADLEROCHIT 8685 TARGET 8748 CURRENT OWC 8870 TOP HOT 8968 ORIGINAL OWC 9034 TOTAL DEPTH 9149 TOP EILEEN SANDSTONE -1 KAVIK (BASE SADLER) -1 (BKB) 1902 3030 3050 3100 3952 4565 5532 ~902 ~376 8415 8607 8607 8607 8610 8648 8737 8800 8922 9020 9086 9201 0 0 1902. 3030 3050 3100 3973 4689 5947 7729 9646 9696 9946 9946 9946 9950 9999 10115 10196 10355 10483. 10568. 10718. 0. 0. 0 o 0. 0. 0 164 529 1333 2472 3698 3730 3890 3890 3890 3893 3924. 3998 4050 4151 4233 4288 4383 0 0 ANGLE 0 00 0 00 0 00 0 00 21 82 39 74 39 74 39 74 39 74 39 74 39 74 39 74 39 74 39 74 39 74 39 74 39 74 39.74 39.74 39.74 39.74 0.00 0.00 pR~.-IMINARY WELL PLA~ WELL R-29 [23-31-12-13] PBU PROPOSED DEPTH MD/BKB 20" Conductor 110' Ball Valve 2100' 10-3/4" Casing 3030' 13-1/2" hole 3050' Top of cement in the 7-5/8" annulus is estimated at 3300' Note: This will provide at a minimum 600' coverage at the top of Ugnu (the shallowest hydrocarbon zone). Ugnu at R-Pad is expected to be water bearing. 4-1/2" 12.6# 13Cr-80 Fox tubing with GLM's 7-5/8" Packer 9646' 5-1/2" Tieback Assembly 9696' 7-5/8" Shoe 9946' 9-7/8" Open Hole 9950' 5-1/2" 17# 13 Cr-NT 80 NSCC Liner PBTD 10640' 5-1/2" Liner Shoe 10718' 6-3/4" Open Hole 10718' SS 6/14//92 ** CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE DATE [2 thru (3) Admin.[~ ,, [9 thru 1'3']' [10 g 13] [14 thru 22] [23 thru 28] (6) Ot her ~'~', g///~// [29 thru 31] (7) Contact [32] (8) Addl ~.~.~'~7~'. o geology' DW~I~~ engineering:/~ MTM/~-~'~ LCS -~/ BEW~, ....... RAD~ rev 04/92 jo/6o011 YES 1. Is permit fee attached ............................................... 2, Is well to be located in a defined pool .............................. 3. Is well located proper distance from property 1 ine ................... 4. Is well located proper distance from other wells ..................... 5, Is sufficient undedicated acreage available in this pool ............. 6, Is well to be deviated & is we!lbore plat included ................... ~_ 7. Is operator the only affected party .................................. 8. Can permit be approved before 15-day wait ............................ . 10. 11. 12. 13. 14. 15. Does operator have a bond in force ................................... ~ Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease nLrnber appropriate ..................................... ~... . ~ Is conductor string provided ............................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor $ surface ............ Will cement tie in surface g intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter $ BOPE attached .... Does BOPE have sufficient pressure rating -- test to~~psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Lease g Well NO 29. 30. 31. 32. FOR EXPLORATORY & STRATIGRAPHIC WELLS' Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone nLrnber of contact to supply weekly progress data ...... 33. Additional requirements ............................................. INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE REMARKS Additional remarks' (:2 0 -q TZ ~0 o~ -~