Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout192-065oN OR BEFORE PLUGGIN~ & LOCATION CLEAR~_NCE REPORT State of Alaska ..~LASKA 0IL & GAS CONSERVATION COM/(ISSiON - A_bnd Data , 3o .?,2_ casing size, wi, depth, om= vol, & procedure. /-/,,./o /fo .~.& c.~' c__.jff Perf i.nUe-~-~a!s - tops Review the well file, and-comment on plugging, well head suaZus, a~d !ocacion clearance - oravide lac. clear, code. Well head cut off: ~arker ~os~ or plate: ~ Location Clear~nce: Conc!usions:~~ Code STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] (~AS [] SUSPENDED [] ABANDONED I~ SERVICE [] Pluaaed back for Redrill 2. Name of Operator 7. Permit Number ARCO Alaska, inc. 92-65 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22261-01 4. Location of well at surface 9. Unit or Lease Name 495' SNL, 1256' EWL, SEC. 14, T12N, R14E l--~r..~ Point Mclntyre At Top Producing Interval L~.,:¥ 10. Well Number At Total Depth Point Mclntyre 768' SNl_, 19' W~L, $~C. 24, T12N, R14E 5. Elevation in feet (indicate KB, DF, etc.) I~. Lease Designation and Serial No. KB£ -- 43' I ADI_ 34624 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 815. Water Depth, if offshore 116. No. of Completions 8/4/92 8/9/92 8/30/92 N/A feet MSL I Zero 14600' MD/8247' TVD 600' MD/600' TVD YE8 [] ~ [] None feet MD 750' (Approx.) 22. Type Electric or Other Logs Run None 23. CASING, LINER AND CEMENTING RECORD SEITING DEPTH MD CASING SIZE Vel'. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94.5# H-40 38' 110' 30" 246 cu ft CS II 13-3/8" 68# N-80 37' 4929' 16" 3960 cu ft cs #/460 cuft "G" 9-5/8" 47# NTSSO 33' 12371' 12-1/4" 937 cuft ge/"G"/690 cuft "G" 24. Perforations open to Production (MD+l-VD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MD) PACKER SET/MD) None None None 26. ACID, FRACTURE, CEMENT SQUEFTF, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 12493'- 12376' 400 sx C/ass "G" 13050'- 12720' 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) Not on production I N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL C HOKESIZE IGAS-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of Iithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Co/ville 11594' 6730' West Sak Sands 11918' 6872' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~)~~ TitleSeniorDri/linoEnoineer Date ,///~//~--~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of serVice Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: if this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P2-50~ BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD POINT MCINTYRE LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 07/21/95 04:00 SPUD: RELEASE: OPERATION: DRLG RIG: POOL 7 WO/C RIG: POOL 7 07/21/95 (1) TD: 0 PB: 0 07/22/95 (2) TD: 0'( 0) 07/23/95 (3) TD: 0'( 0) 07/24/95 ( 4) TD: 0'( 0) 07/25/95 (5) TD:12284' (12284) CHANGE OUT TBG SPOOL MW: 0.0 ACCEPT RIG @ 04:00 HOURS ON 7/21/95. CHECK WELL F/PRESSURE. CHANGE OUT TBG SPOOL--APPEARS DAMAGED. RIGGED UP RAMS MW: 0.0 VIS: 0 WELLHEAD WORK. REMOVED CASING SPOOL. INSTALLED CASING SPOOL. INSTALL NEW TUBING SPOOL AND PACK OFF TEST TO 3500 PSI. NIPPLE UP ALL RAMS. RIGGED UP ALL RAMS. REPAIRED TOP DRIVE MOTOR MW: 0.0 VIS: 0 NIPPLE UP ALL RAMS. TEST WELL CONTROL EQUIP. TESTED BOPE 500 LOW 5000 PSI HIGH. HYDRILL 500 LOW AND 3000 PSI HIGH. BHA RUN NO. 1. BHA NO. 1 MADE UP. R.I.H. TO 502 FT. CBU @ 500 FT. OBTAINED CLEAN RETURNS 1.25 HOLE VOLUME. CBU @ 502 FT. OBTAINED BOTTOMS UP 100% ANNULUS VOLUME. POOH TO 20 FT. PULLED BHA. BHA LAID OUT. BHA RUN NO. 1. BHA NO. 1 MADE UP. R.I.H. TO 12284 FT. TOP DRIVE MOTOR FAILED - CHANGE OPERATION. REMOVE TOP DRIVE FROM DERRICK. RIG DOWN TOP DRIVE. REPAIRED TOP DRIVE MOTOR. RIGGED DOWN LOGGING MW: 0.0 VIS: 0 REPAIRED TOP DRIVE MOTOR. BHA RUN NO. 1. CBU @12284 FT. BREAK CIRC. POOH TO 150 FT. PULLED BHA. RIGGED UP LOGGING. RAN ELECTRIC LOGS. USIT SHOWS 40 TO 50% WEAR FROM 1750' TO 1930', 880' TO 1200' AND 530' TO 800'. COMPLETED LOGGING RUN W/GR FROM 12150 FT. TO 0 FT. RIGGED DOWN LOGGING. POOH TO 6000 FT. MW: 0.0 VIS: 0 WELL : P2-50~ OPERATION: RIG : POOL 7 PAGE: 2 07/26/95 (6) TD:12284' ( 0) 07/27/95 ( 7) TD: 2462' ( 0) 07/28/95 (8) TD: 2478' ( 16) 07/29/95 (9) TD:12225' (9747) CBU @ 2460 FT. MW: 0.0 VIS: 0 BHA RUN NO. 2. POOH TO 212 FT. PLANNED MAINT. COMMISSIONED KELLY. M/U KELLY. BHA RUN NO. 3. RIH TO 1017 FT. TESTED CASG. RIH TO 1960 FT. TESTED CASG. POOH TO 724 FT. POOH PRESSURE TESTED @915", 820' 724' AND 631. TESTED CASG. VIA ANNULUS. POOH TO 20 FT. PULLE BHA. BHA LAID OUT. BHA RUN NO. 4. RIH TO 3480 FT. AT SETTING DEPTH 3480 FT. SET RBP @3480. PRESSURE TEST COMP. SUCCESSFULLY 500 PSI. POOH TO 20 FT. PULLED BHA. BHA LAID OUT. RUN CASING 7" O.D. RAN CASING TO 35 FT. P/U 1 JT. OF 7" CASG. SET OF SLIPS. DUMP 2500# OF SAND ON TOP OF BRIDGE PLUG. AT TOP OF HANGER 35 FT. LAID DOWN CASG. TO 35 FT. COMPLETED OPERATIONS. BHA RUN NO. 5. MADE UP BHA RUN NO. 5. RIH TO 3425 FT. RIH TAG SAND @3425'. AT TOP OF FILL 3425 FT. POOH TO 2460 FT. AT SETTING DEPTH 2460 FT. FUNCT. DOWNHOLE TOOLS AT 2462 FT. EQUIP. WORK COMP. CBU AT 2460 FT. ! RIGGED DW. CASG HANDL EQUIP MW: 0.0 VIS: 0 BHA RUN NO. 5. CBU AT 2460 FT. OBTAINED BOTTOMS UP (100% ANNULUS VOL.) POOH TO 20 FT. PULLED BHA. NIPPLE DOWN BOP STACK. NIPPLE UP BOP STACK. RIGGED UP FLUID SYSTEM. NIPPLE DOWN BOP STACK. RIGGED UP HANDLING EQUIP. NIPPLE UP BOP STACK. PULL CASG. 9 5/8" O.D. RIGGED UP CASG. HANDLING EQUIPMENT. LAID DOWN CASG. TO 40 FT. PERFORM INTEGRITY TEST. TEST BOP STACK. R/U CIRC. HEAD AND TEST STACK TO 250 PSI. PULL CASING. LAID DOWN CASG. TO 2460 FT. 63 JTS. LAID OUT. RIGGED DOWN CASING HANDLING EQUIP. TESTED CASING MW: 0.0 VIS: 0 PULLED CASG. BHA RUN NO. 6. BHA NO. 6 MADE UP. RIH TO 2460 FT. WORKED TOOLSTRING AT 2460 FT. COMP. OPERATIONS. CBU AT 2460 FT. OBTAINED REQ'D FLUID PROPERTIES - 150 % HOLE VOL. POOH TO 340 FT. PULLED BHA. BHA RUN NO. 7. RIH TO 2460 FT. POOH TO 30 FT. RUN CASG. WORK COMP. RAN CASG. TO 2460 FT. EQUIP. WORK COMPLETED. WORKED TOOLSTRING AT 2478 FT. COMPLETED OPERATIONS. TESTED CASG. RIGGED DOWN DRILLFLOOR MW: 0.0 VIS: 0 RUN CASG. TESTED CASG. RIGGED DOWN CASG. HANDLING EQUIP. NIPPLE DOWN BOP STACK. NIPPLE UP BOP STACK. TEST WELL CONTROL EQUIP. BHA RUN NO. 8. RIH TO 3462 FT. CBU AT 3480 FT. OBTAINED CLEAN RETURNS. 300% HOLE VOLUME. POOH TO 0 FT. BHA RUN NO. 9. P/U MWD AND SURFACE TEST W/KELLY. NO TEST, C/O MWD AND RETEST - OK. TOP DRIVE FAILED. REPAIR. RIGGED DOWN DRILLFLOOR/DERRICK. L/D KELLY. WORK COMP. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSlUN APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon x Suspend __ Operation Shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging X Time extension __ Stimulate __ Change approved program __ Pull tubing __ Variance __ Perforate __ Other X .. Plugback for Redrill 2. Name of Operator ARCO Alaska, Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 495' SNL, 1256' EWL, SEC. 14, T12N, R14E, UM 5. Type of Well: Development x Exploratory __ Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 48 feet . Unit or Property name Point Mclntyre 8. Well number P2-50A At top of productive interval 9. Permit number ORIGINAL At effective depth 10. APl number 61' SNL, 3424' EWL, SEC. 24, T12N, R14E, UM 50- 029-22261-01 At total depth 11. Field/Pool 768' SNL, 19' WEL, SEC. 24, T12N, R14E, UM Point Mclntyre / Undefined 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 65' Surface 4884' Intermediate Production 15299' Liner Perforation depth: measured None 14600 feet 8247 feet 12225 feet 6986 feet Size 20" 13- 3/8" 9-5/8" true vertical Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) Plugs (measured) Junk (measured) Cemented Cement Plugs 13050'- 12720', 12493'- 12225' Bridge plug @ 600' Measured depth True vertical depth 245 cu ft CS II 55' 55' 3960 cu ft CS II & 4921' 4000' 460 cu ft Class "G" 937cu fl gel G & 15336' 8799' 690 cu ft Class "G" 13. Attachments Description summary of proposal × Detailed operations program __ BOP sketch 14. Estimated date for commencing operation O7/20/95 16. If proposal was verbally approved Oil~ Gas __ Name of approver Date approved Service 17. I here~;~.y certify/t'l~t~the foregoing is trj~e and correct to the best of my knowledge. Signed ~~---~~ Title Drilling Engineering Supervisor ~ ~ FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test__ Mechanical Integrity Test __ Approved by order of the Commission Form 10-403 Rev 06/15/88 15. Status of well classification as: Location clearance Subsequent form required 10-/..(,(3 7' Original Signed By David W. Johnston Suspended x Date ~////~' I Approval No. ~,.~'-~/c,~--~ Approved Copy I SUBMIT IN TRIPLICATE P2-50A SUMMARY PROCEDURE: 1. Move in drilling rig. Check well for pressure and bleed off if necessary. 2. Install a BPV. Remove the production tree. , . . NU BOP's. Install tree test plug. Test BOP's to 5000 psi. Pull tree test plug and BPV. Pick up RBP retrieving tool and recover bridge plug at 600'. Run in hole with 8- 1/2" bit and casing scraper to displace diesel cap to brine and ensure the wellbore is clear of obstruction. RU Schlumberger wireline and run a USIT Icg from as deep as possible to surface. (wellbore reaches 67° inclination by 4900'). 6. Run Gyro survey from top of cement plug to surface. RD Schumberger Wireline. lx\~sY, a Oi~ & Gas Cons. Commiss'~on Redrill Plan Summary P2-50 A APl # 50-029-22261-0 8~ · a.a.a.a..a.~,a.a 2 Status as of 6/20/95 Well St at us: Surface Location: 495' FNL, 1256' FWL, Sec 14, T12N, R14E, UM RKB To Tubing Hanger: 46 Feet Top of Kuparuk: .... ' MD ( .... 'SS) Reference Log: Annulus Fluids: Diesel to 600', 9.8 Brine Water below Spud Dat e: 5/12/92 Completion Date: N/A MINIMUM ID: JEWELRY 1. RBP@ 600' md 2. Cement Plug f/ 12493 - 12225' md 3. Window # 2 f/ 12,375-12,455' md 4. Window # 1 f/ 12,770-12,835' md, ST #1 to 14600' md/8248' tvd, ST #2 to12998' md. Cement sqz'd w/ 650 sx.. 5. 17 ppg mud f / 13050 - 12493' md. 6. CIBP @ 13,050' md 7. Cement Plug f/ 15841-14702' md GA S LIFT MANDREL INFO MD TVD MANDREL TYFE None VALVE/LATCH TFO CASING AND TUBING SIZE WT GRADE TOP BOTTOM 8. 13-3/8" 68# L80 SURFACE 4921 (2jts 13-3/8" 68# K-55 on top), cemented to surface 9. 9-5/8" 47# NTS80 SURFACE 15336 Cmtd w/ 650 sx (167 bbls) lead & 600 sx (123 bbls) tail DESQ::IIPTION CASING CASING PERFORATION DATA INTERVAL ZONE FT SPF SIZE PHASE DATE 9 · 10 10. Cement plug top @ 14702' md 11. 15841' md /9237' tvd MAX HOLE ANGLE: 67.5° AT 4865' MD HOLEANGLE@ 15222' md: 31.6° Issue Date: 2/21/95 (1) ARCO Alaska, Inc. , Post Office Box 100360 Anchorage Alaska 99510-0360 Telephone 907 276 1215 March 31, 1995 Mr. David W. Johnston Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Dear Mr. Johnston, Re: Suspended Well Update ARCO Alaska Inc. ("ARCO") has compiled data pertaining to the 25 suspended wells described in your August 19, 1994, letter. Any additional suspended wells which were discovered during our research are also included in this update. I have attached an update on each well and grouped the wells by geographic area. If you have any questions, please call the ARCO Contact indicated for each geographical area or me at 265-6914. Sincerely, / ./~?J;.~.m.es .R.W. ine0a, rner, CPL /./'Senior Land~,,grr' JRW:hb Enclosures CC; M. L. Bill L. D. Brown H. R. Engel R. M. Lance T. W. McKay G. K. Phillips M. J. Reisterer ATO 1528 LAO 466 ATO 1918 ATO 1420 ATO 1202 ATO 496 ATO 1439 RECEIVED APR 1 4 1995 Alaska Oil & Gas Cons. Commission Anchora. ,, ARCO Alaska, Inc. is a Subsidiary of Atlantic Richfield Company RECEIVED Greater Pt. Mclntyre Area (ARCO Contact: George Phillips 263-4280) APR 1 4 1995 Alaska Oil & Gas Cons. Commission Anch0ra, ',~ ARCO hereby requests extensions of "suspended" status for the following wells. Additionally, an exception to the surface plug requirement of AOGCC 20AAC25.110(c) is requested. All of these wells are located in safe and accessible locations on producing drill sites that are monitored daily. The individual status of each well is detailed below. West Beach State #3, APl # 50-029-20208-00, Permit # 76-0034-0 This well was Certified Capable of Producing in Paying Quantities on February 1, 1979. The well was with suspended with a cement plug. An abandonment cap has been installed and tested. This well has the potential for use as a gas injection well to support the West Beach #4 well either by re-entering and/or sidetracking. Pt. Mclntyre P2-59 (PM-9), APl # 50-029-22096-00, Permit #90-0140-0 This well has not been tied into the facilities. It tested at a rate of 1208 BOPD from the Kuparuk formation. It was suspended with tubing and packer and with a plug in the tubing. The SSSV is closed and a back pressure valve is set. To produce this well will require a workover. This well is being evaluated as a producer. More data from offset Pt. Mclntyre wells is being used to determine the economics. Pt. Mclntyre P2-50A, APl # 50-029-22261-00, Permit # 92-0065-0 This well is being evaluated as a sidetrack to a new Pt. Mclntyre development location. The following wells have changed their status since you requested your update: Pt. Mclntyre P1-03 (PM-4), APl # 50-029-21912-00, Permit # 89-0013-0 This well was Certified Capable of Producing in Paying Quantities on February 13, 1989. This well is now a producer. Pt. Mclntyre P1-25 (PM-5), APl # 50-029-21937-00, Permit # 89-0041-0 This well was worked over in August of 1994 and converted to a water injection well. ARCO hereby requests extensions of "suspended" status for the following wells. Gull Island State #1, APl # 50-029-20151-00, Permit # 74-0057-0 This well was Certified Capable of Producing in Paying Quantities on February 1, 1977. Gull Island State #2, APl # 50-029-20195-00, Permit # 76-0013-0 This well was Certified Capable of Producing in Paying Quantities on April 26, 1977. The following wells have changed their status since you requested your update: Pt. Mclntyre P1-03 (PM-4), APl # 50-029-21912-00, Permit # 89-0013-0 This well was Certified Capable of Producing in Paying Quantities on February 13, 1989. This well is now a producer. Pt. Mclntyre P3-01 (PM-5), APl # 50-029-21937-00, Permit # 89-0041-0 This well was worked over in August of 1994 and converted to a water injection well. Pt. Mclntyre P2-50A, APl # 50-029-22261-00, Permit # 92-0065-0 This well was suspended with a waiver for a bridge plug at 200' & 300'. This well is being evaluated as a sidetrack to a new Pt. Mclntyre development location. ARCO Alaska, Inc. Post Office Box .~J0360 Anchorage Alaska 99510-0360 Telephone 907 276 1215 March 31, 1995 Mr. David W. Johnston Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Dear Mr. Johnston, Re: Suspended Well Update ARCO Alaska Inc. ("ARCO") has compiled data pertaining to the 25 suspended wells described in your August 19, 1994, letter. Any additional suspended wells which were discovered during our research are also included in this update. I have attached an update on each well and grouped the wells by geographic area. If you have any questions, please call the ARCO Contact indicated for each geographical area or me at 265-6914. Sincerely, / . ' a~.rner, CPL "'Senior Landm~,~ JRW:hb Enclosures CC: M. L. Bill L. D. Brown H. R. Engel R. M. Lance T. W. McKay G. K. Phillips M. J. Reisterer ATO 1528 LAO 466 ATO 1918 ATO 1420 ATO 1202 ATO 496 ATO 1439 RECEIVED APR 1 4 1995 Alaska. Oil & Gas Cons. Commission Anchora ARCO Alaska, Inc. is e Subsidiary of Allanflc Richfield Company RECEIVED Greater Pt. Mclntyre Area (ARCO Contact: George Phillips 263-4280) APR 1 4 1995 Alaska Oil & Gas Cons. Commission Anch0ra,'. ARCO hereby requests extensions of "suspended" status for the following wells. Additionally, an exception to the surface plug requirement of AOGCC 20AAC25.110(c) is requested. All of these wells are located in safe and accessible locations on producing drill sites that are monitored daily. The individual status of each well is detailed below. West Beach State #3, APl # 50-029-20208-00, Permit # 76-0034-0 This well was Certified Capable of Producing in Paying Quantities on February 1, 1979. The well was with suspended with a cement plug. An abandonment cap has been installed and tested. This well has the potential for use as a gas injection well to support the West Beach #4 well either by re-entering and/or sidetracking. Pt. Mclntyre P2-59 (PM-9), APl # 50-029-22096-00, Permit #90-0140-0 This well has not been tied into the facilities. It tested at a rate of 1208 BOPD from the Kuparuk formation, it was suspended with tubing and packer and with a plug in the tubing. The SSSV is closed and a back pressure valve is set. To produce this well will require a workover. This well is being evaluated as a producer. More data from offset Pt. Mclntyre wells is being used to determine the economics. Pt. Mclntyre P2-50A, APl # 50-029-22261-00, Permit # 92-0065-0 This well is being evaluated as a sidetrack to a new Pt. Mclntyre development location. The following wells have changed their status since you requested your update: Pt. Mclntyre P1-03 (PM-4), APl # 50-029-21912-00, Permit # 89-0013-0 This well was Certified Capable of Producing in Paying Quantities on February 13, 1989. This well is now a producer. Pt. Mclntyre P1-25 (PM-5), APl # 50-029-21937-00, Permit # 89-0041-0 This well was worked over in August of 1994 and converted to a water injection well. ARCO hereby requests extensions of "suspended" status for the following wells. Gull Island State #1, APl # 50-029-20151-00, Permit # 74-0057-0 This well was Certified Capable of Producing in Paying Quantities on February 1, 1977. Gull Island State #2, APl # 50-029-20195-00, Permit # 76-0013-0 This well was Certified Capable of Producing in Paying Quantities on April 26, 1977. The following wells have changed their status since you requested your update: Pt. Mclntyre P1-03 (PM-4), APl # 50-029-21912-00, Permit # 89-0013-0 This well was Certified Capable of Producing in Paying Quantities on February 13, 1989. This well is now a producer. Pt. Mclntyre P3-01 (PM-5), APl # 50-029-21937-00, Permit # 89-0041-0 This well was worked over in August of 1994 and converted to a water injection well. Pt. Mclntyre P2-50A, APl # 50-029-22261-00, Permit # 92-0065-0 This well was suspended with a waiver for a bridge plug at 200' & 300'. This well is being evaluated as a sidetrack to a new Pt. Mclntyre development location. ALASKA OIL AND GAS · CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 August 19, 1994 David Sutter, Land Manager ARCO Alaska Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Suspended Wells Compliance with regulations Dear Mr. Sutter: ARCO Alaska Inc. has 25 suspended wells as shown on the attached lists: ARCO SUSPENDED WELLS PRIOR TO 1980 and ARCO SUSPENDED WELL SINCE 1980. The applicable regulation is as follows: 20 AAC 25.110 SUSPENDED WELLS (a) Upon application by the operator under 20 AAC 25.105(e), the commission will, in its discretion, approve the suspension of a well if the well (1) encounters hydrocarbons of sufficient quality and quantity to indicate the well is capable of producing in paying quantities as reasonably demonstrated by well tests or interpretive formation evaluation data; or (2) is reasonably demonstrated to have future value as a service well. For each well on the attached lists of suspended wells, please provide data showing that the well meets the criteria of (1) or (2) above or advise as to your plans to abandon the well. Wells that meet the criteria of (a) above that you wish to maintain as suspended, as required by 20 AAC 25.110(e), must have well site inspections this year prior to snow covering the locations. Chairman encls c: Blair Wondzell bew/llarsusp ARCO SUSPENDED WELLS PRIOR TO 1980 AS OF AUGUST 1994 PERMIT 00-0242-0 68-0095-0 69-0036-0 73-0027-0 74-0056-0 74-0057-0 76-0013-0 76-0017-0 76-0034-0 78-0017-0 API NUMBER 029-21821-00 029-20004-00 029-20017-00 179-20004-00 029-20150-00 029-20151-00 029-20195-00 029-20199-00 029-20208-00 029-20278-00 WELL WELL WELL NAME CLASS STATUS PRUDHOE BAY UNIT OWDW-C SER SUSP DELTA ST I EXP SUSP PUT RIV ST 1 EXP SUSP KAVIK LTNIT 3 DEV SUSP DELTA ST 2 EXP SUSP GULL IS ST I EXP SUSP GULL IS ST 2 EXP SUSP HIGHLAND ST 1 DEV SUSP W BEACH ST 3 EXP SUSP W MIKKELSEN ST i EXP SUSP STATUS DATE 6/23/73 2/27/69 7/01/69 5/02/74 5/17/75 4/01/76 4/22/77 4/12/76 7/26/76 11/11/78 SECT 10 O7 08 35 28 24 25 32 TWP 10N 10N 10N 03N llN 12N 12N llN 12N 10N RNG 014E 016E 014E 023E 016E 01SE 015E 011E 014E 019E MER U U U U U U U U U U ARCO SUSPENDED WELLS SINCE 1980 AS OF AUGUST 1994 PERMIT 60-0041-0 82-0038-0 82-0218-0 83-0181-0 84-0156-0 84-0205-0 86-0056-0 89-0013-0 89-0041-0 90-0036-0 91-0069-0 92-0065-0 93-0174-0 93-0179-0 94-0043-0 API NUMBER 133-10142-00 029-20727-00 029-20585~00 029-21056-00 029-21181-00 029-21221-00 029-20138-01 029-21912-00 029-21937-00 029-22027-00 029-22173-00 029-22261-01 029-22419-00 029-22423-00 029-20614-01 WELL WELL WELL NAME CLASS STATUS SWANSON RIV UNIT 34-15 DEV SUSP KIJPARUK RIV UNIT 1H-05 DEV SUSP RAVIK ST 1 EXP SUSP HEMI SPRINGS ST 1 EXP SUSP PRUDHOE BaY UNIT DS18-11 DEV SUSP PRUDHOE BAY UNIT DSll-15 DEV SUSP W BEACH ST 1-a SER SUSP PT MCINTYRE P1-03 EXP SUSP PT MCINTYRE P3-01 DEV SUSP KUPARUK RIY UNIT 1L-20 DEV SUSP KUPARUK RIV UNIT 1L-26 DEV SUSP PT MCINTYRE P2-50A DEV SUSP KUPARUK RIV UNIT 2E-17 DEV SUSP KUPARUK RIV UNIT 2E-05 DEV SUSP PRUDHOE BaY UNIT DS12-13A DEV SUSP STATUS DATE 8/21/91 5/18/82 4/03/83 4/03/84 9/17/84 2/14/91 5/06/86 4/26/89 7/03/89 3/31/91 6/09/91 8/30/92 4/25/94 4/25/94 4/03/94 SECT 15 33 32 19 33 25 16 22 29 32 36 36 TWP 08N 12N 09N I0N liN 12N 12N liN 10N RNG 009W 010E 009E 011E 01SE 01SE 014E 014E 014E 010E OIOE 014E 009E 009E 01SE MER S U U U U U U U U U U U U U U STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED 1'3 SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, inc. 92-65 3. Address 3. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22261-01 4. Location of well at surface D. Unit or Lease Name 495' SNL, 1256' EWL, SEC. 14, T12N, R14E ]'~A~ [ Point Mclntyre At Top Producing Interval ~,. I 10. Well Number N/A I t .~ P2-50A ! 11. Field and Pool At Total Depth 768' SNL, 19' WEL, SEC. 24, T12N, R14E ~ Point Mclntyre 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. KBE = 43' I ADL 34624 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 8/4/92 8/9/92 8/30/92I N/A feet MSL I Zero 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+'DVD 19. Directional Survey 120. Depth where SSSV set ~21. Thickness of Permafrost 14600' MD/8247' TVD 600' MD~600' TVD YES [] t,D []I None feet MD ! 1750' (Approx.) 22. Type Electric or Other Logs Run None 23. CASING, LINER AND CEMENTING R~D SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94. 5# H-40 38' 110' 30" 246 cu ft CS II 13-3/8" 68# N-80 37' 4929' 16" 3960 cuft cs 11/46o cuft "G" 9-5/8" 47# NTS80 33' 12774' 12-1/4" 937 cu ft gel "G"/690 cuft "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MDI None None None 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 600' Bridge plug 12493'-12225' 13050 '- 12 720' 27. PRODLX~TION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) Not on production I N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL ,~J~S-MCF WATER-BBL CHOKE SIZe: IGAS-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure 3ALCULATED DIL-BBL GAS-MCF ~VATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brier description of lithology, porosity, fractures, apparent dips, and presence ol oil, gas or water. Submit core chips. RECEIVED JUL 2 2 1994 Alaska 0il & Gas Cons. Commission Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOG~ MARKERS rORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Colville 11594' 6730' Wet Sak Sands 11918' 6872' RECEIVED JUL 2 2 1994 Alaska Oil & Gas Cons. - , ,l~omm~ss~on Anchora~o 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~~j~~ TitleDri//ingEngineerSuoervisor Date "~/'~/~:~ ~-~'' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P2-50 A BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD: POINT MCINTYRE LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 07/28/92 03:30 SPUD: 08/04/92 09:30 RELEASE: 08/30/92 12:00 OPERATION: DRLG RIG: AUDI 2 WO/C RIG: AUDI 2 07/29/92 ( 1) TD:13050 PB: 0 07/30/92 (2) TD:12835 PB: 0 POOH W/ BP SET TOOL. MW:10.0 WBM N/U BOPE. TEST BOPE. RETRIVE BP @ 595' POOH. RIH W/ CIBP TO 13050' SET BP. DISP W/ BIOZAN MUD. SPOT 17 PPG PILL F/ 12800'~13050'. POOH. POOH W/ SECTION MILL. MW: 9.9 WBM POOH W/ BP SETTING TOOL. RIH W/ SECTION MILL. CUT & MILL CSG F/ 12770'-12835' CIRC. POOH. 07/31/92 ( 3) TD:12835 PB: 0 08/01/92 (4) TD:12835 PB: 0 08/02/92 ( 5) TD:12835 PB: 0 RIH W/ STRING SHOT. MW:10.0 WBM POOH TO 9311' MILL KNIVES WOULD NOT CLOSE. CIRC PIPE TO 8967' STUCK. R/U ATLAS. RIH W/ CCL & STRING SHOT. 2 ATTEMPTS TO GET STRING SHOT TO BTM. LAST ATTEMPT ONLY GET TO 5750'. RIH W/ JAR ASS'Y. MW:10.0 WBM RIH W/ CCL/STRING SHOT. WORK TO 8285'. APPLY TORQ. FIRE SHOT. BACK OFF. POOH W/ W/L. R/D ATLAS. CIRC. POOH. RECOVER 1 JT HWDP. RIH W/ FTA #1. RIH W/ BLADED MILL. MW:10.0 WBM RIH TO 8312'. CIRC. SCREW INTO FISH. JAR FREE. PUMP OUT OF HOLE. SECTION MILL CLEAN. RIH W/ BLADED MILL. 08/03/92 (6) TD:12835 PB: 0 POOH W/ BLADED MILL. RIH W/ MILL TO 4000'. CBU. RIH TO 6000' REAM TO 13000' CIRC. POOH W/ MILL. MW:10.0 WBM CBU. WASH & 08/04/92 (7) TD:12835 PB: 0 08/05/92 (8) TD: 12810' (12810) P/U DRLG ASS'Y #1. MW:10.0 WBM POOH W/ BLADED MILL. RIH W/ MULE SHOE TO 13000' ATTEMPT TO REV CIRC. CIRC. R/U BJ. PUMP 16 BBLS WATER, 250 SX (45 BBLS) 'G' CMT @ 15.8 PPG. POOH 16 STDS TO 11500' SQZ CMT W/ 1300 PSI. POOH. P/U BHA #1. DRLG. MW: 9.9 VIS: 67 RIH W/ BIT TO 7450' TEST CSG. OK. RIH TO 11800' TAG CMT. DRLG CMT F/ li800'-12041. CIRC. DRLG F/ 12041'-12774' KICK OFF @ 21:30 HRS, 8/4/92. DRLG F/ 12774'-12810' WELL : P2-50 A OPERATION: RIG : AUDI 2 PAGE: 2 08/06/92 (9) TD:12873' ( 63) 08/07/92 (10) TD:13155' ( 282) 08/08/92 (11) TD:13655' ( 500) DISP WELL W/ OBM MW: 9.9 VIS: 57 DRLG TO 12873'. CIRC. HOLE COLLAPSED. WORK PIPE THRU COLLAPSED HOLE. PUMP VISCOUS SLUGS. WASH TO BTM F/ 12580'-12873' CBUc~Rc.POOH TO 6500'~, CIRC. 0RIH TO BTM. REAM 30' TO BTM. DISP WELL ,, LVT-20 . DRLG. MW:10.0 VIS: 71 DISP WELL TO VERSA-CORE OBM. CLEAN PITS. WASH TO BTM. DRLG F/ 12873'-13155'. DRLG. DRLG F/ 13155'-13655'. MW: 9.9 VIS: 71 08/09/92 (12) TD:14350' ( 695) DRLG. DRLG F/ 13655'-14350'. MW: 9.9 VIS: 74 08/10/92 (13) TD:14600' ( 250) 08/11/92 (14) TD:14600' ( 0) 08/12/92 (15) TD:14600' ( 0) 08/13/92 (16) TD:12804' ( 0) 08/14/92 (17) TD:12967' ( 163) 08/15/92 (18) TD:12998' ( 31) POOH. MW:10.0 VIS: 78 DRLG TO 14600' CBU. POOH TO WINDOW. CIRC. REAM @ WINDOW. RIH. REAM F/ 12877'-12996'. POOH. TIH W/MILLS MW:10.2 VIS: 78 POH WET W/TIGHT DP CONNECTIONS, SET BACK BHA & DOWNLOAD MWD, LOGGING TOOL FAILURE W/INTERNAL WIRING, TEST BOPE, P/U NEW BIT,MOTOR & MWD & RIH TO 6000', RIG SERVICE, CBU, HOLE UNLOADED A SMALL AMT CTGS, RIH TO 12700', WORK DOWN TO WINDOW & ATTEMPT TO CLEAN OUT TO SIDETRACK, HIT OBSTRUCTION · @ 12825', EVENTUALLY WORKED PAST TO 12835 , STOPPED AGAIN @ · 12860', WORKED PAST TO 12892 , NO MOVEMENT OR PROGRESS, POH, M/U MILLING ASSEMB. TO CLEAN OUT THE WINDOW CHANGING BHA MW:10.3 VIS: 94 RIH TO 12770, MILLED, POH. ST HIGH. CBU. TOH W/MILL, TIGHT CONN. PU BHA & TIH. SERV RIG. CONT TIH TO 12770. UNABLE TO MILL. UNABLE TO GET INTO EITHER SIDETRACK. POH, CBU. TOH, LD BHA. CONTROL DRLG MW:10.2 VIS: 81 FINISHED BHA & ORIENTED TELECO. CUR & SLIP DRL LINE. TIH, CONTROLLED DRLG TO 12804. RIH TO CMT. MW:10.2 VIS: 83 DRLG F/ 12804'-12967' POOH TO 12800'. HIT CSG STUB. ATTEMPT TO WORK BACK INTO SIDETRACK. WORK PAST STUB @ 12908· POOH ABOVE WINDOW. CIRC. POOH. RIH W/ MULESHOE, 3-1/2" DP. CIRC. MW:10.0 VIS: 50 RIH. PLUGGED DP. POOH. RIH W/ 5"X5" CMT STINGER TO 12770' WASH TO 12998' CIRC SWEEP. CIRC CORE FLUID. WELL : P2-50 A OPERATION: RIG : AUDI 2 PAGE: 3 08/16/92 (19) TD:12998' ( 0) 08/17/92 (20) TD:12772' ( 0) 08/18/92 (21) TD:12720' ( 0) 08/19/92 (22) TD:12397' ( 0) 08/20/92 (23) TD:12455' ( 58) 08/21/92 (24) TD:12455' ( 0) 08/22/92 (25) TD:12455' ( 0) 08/23/92 (26) TD:12455' ( 0) RIH W/ BHA #7. MW:10.0 VIS: 43 CIRC. PUMP 16 BBLS 2% CAUSTIC WATER, 16 BBLS ARCO SPACER, 300 SX (51 BBLS) 'G' CMT W/ .5% CD-31, .05% R-i, 1 MGHS FP-6L. PUMP 4 BBLS ARCO SPACER, 4 BBLS 2% CAUSTIC WATER, 190 BBLS MUD. POOH 15 STDS. CIRC. POOH. RIH W/ BHA #7. CBU. MW:10.0 VIS: 46 RIH TO 11720' WASH CMT TO 12505'. POOH TO 11477'. WASH & REAM F/ 114~7'-12699' DRLG CMT TO 12772' POOH RIH W/ MOD CMT STINGER. DRLG HARD CMT. MW:10.1 VIS: 40 CBU. WASH F/ 12770'-12835'. CIRC. PUMP 16 BBLS 2% CAUSTIC WATER, 63 BBLS (350 SX) CMT SLURRY, 2 BBLS WATER, 4 BBLS CAUSTIC WATER. DISP W/ MUD. POOH 20 STDS. CIRC. POOH. TEST BOPE. RIH. TAG CMT STRINGERS @ 11318' REAM STRINGERS F/ 11318'-11957' DRLG CMT F/ 11957'-125~0' NOTE: NEW EFC REFLECTS EXPECTED COSTS TO CUT NEW SECTION AND SIDETRACK WELL. PREVIOUS SIDETRACK ABANDONED. MILLING SECTION MW:10.0 VIS:126 DRILL HARD CMT. CIRC & COND MUD. POH, RIH. SLIP & CUT DRIL LINE. RIH. CIRC & COND MUD. MILLING SECTION TO 12397. NOTE: NEW EFC REFLECTS EXPECTED COSTS TO CUT NEW SECTION & ST WELL. SIDETRACK OPERATION ABANDONED. POH MW:10.0 VIS:155 MILLED TO 12455. METAL RETURNS. PUMP HI-VIS SWEEPS TO CLEAN HOLE. WORKED MILL THROUGH. HOLE PACKED OFF WHEN ATTMPT TO CIRC. RIH, ROTATE & EST CIRC. POH. WILL CIRC AS NEEDED TO WORK MILL OUT OF HOLE. R/U ATLAS. MW: 9.9 VIS:ll6 POOH W/ MILL TO 9843'. CIRC. JAR. ROTATE. WORK OUT 2 STDS. JAR. POOH. DRILL STRING PARTED. CIRC. POOH. L/D PARTED JT. RIH W/ OVERSHOT FTA. LATCH FISH @ 2574' ATTEMPT TO CIRC. NO GO. R/U ATLAS FOR STRING SHOT. ATTEMPT BACKOFF. MW:10.0 VIS:120 RUN BACKOFF SHOT TO 4299'. POOH. R/D W/L. CIRC. POOH. RIH W/ SCREW IN SUB. CIRC. SCREW INTO FISH @ 4299'_ JAR. MILL MOVE UP HOLE TO 8929'. CIRC. R/U ATLAS. RIH W/ STRING SHOT TO 8800'. ATTEMPT BACKOFF. WORK STUCK PIPE. MW:10.0 VIS: 40 SCREW INTO FISH. ATTEMPT BACKOFF @ 8809'. R/D ATLAS. CIRC. BACKOFF. HOLE PACKED OFF. JAR. PIPE FREE. POOH TO 4299' PUMP OUT OF HOLE. PIPE STUCK @ 781' AlaSka 0i~ & ~a$ Cons. Commission Anchora~ WELL : P2-50 A OPERATION: RIG : AUDI 2 PAGE: 4 08/24/92 (27) TD:12455' ( 0) CLEAN BOPE. MW:10.0 VIS: 40 WORK STUCK PIPE. R/U ATLAS. RUN CCL. BTM OF FISH @ 805'. RUN FREEPOINT. RIH W/ STRING SHOT. FIRE. NO GO. RIH W/ STRING SHOT. BACKOFF. R/D ATLAS. POOH. RIH W/ FTA. LOCATE FISH @ 531'. SCREW INTO FISH. JAR. WORK FISH TO FLOOR. L/D FISH. CLEAN BOPE. 08/25/92 (28) TD:12455' ( 0) LOOK FOR FISH. MW: 9.9 VIS: 40 CLEAN BOPE. RIH W/ MILL. WASH TO 4155'. REAM TOP 6360' CIRC. WASH & REAM TO 10' ABOVE FISH. LOOKING FOR FISH. CURRENTLY @ 12157'. 08/26/92 (29) TD:12455' ( 0) RIH W/ BHA #12. MW: 9.9 VIS: 89 REAM TO 12164' TOF @ 12164'. CIRC. POOH TO 6500' CIRC. CIRC & POOH TO 5500' CIRC. POOH. TEST BOPE. RIH W/ BHA #12. 08/27/92 (30) TD:12455' ( 0) POOH W/ FISH. MW: 9.9 VIS: 76 CIRC @ 6500'. RIH TO 12164' CIRC. POOH TO 6500' CIRC. POOH. L/D BHA. RIH W/ SCREW IN SUB. CIRC. ENGAGE FISH. ROTATE & WORK FISH UP HOLE. POOH. 08/28/92 (31) TD:12455' ( 0) WOC. MW: 9.9 VIS: 48 POOH. L/D FISH. RIH W/ CMT STINGER. CBU @ 6500' RIH TO 12375'. WASH TO 14493'. CIRC. PUMP 2 BBLS WATER, 16 BBLS 2% CAUSTIC WATER, 400 SX (72 BBLS) 'G' CMT @ 16.8 PPG. DISP W/ WATER, MUD. POOH 15 STDS. DROP BALL & CIRC. POOH. L/D CMT STINGER. WOC. CLEAN PITS. 08/29/92 (32) TD:12275' ( 0) INJECT MUD. MW: 9.9 VIS: 97 CLEAN PITS. WOC. L/D BHA. RIH W/ BHA. TAG CMT @ 11264'. DRLG CMT TO 12175'. ATTEMPT WT TEST. NO GO. DRLG CMT F/ 12175'-12225'. TEST CMT W/ WT. CIRC. INJECT MUD. 08/30/92 (33) TD:12275' ( 0) SIGNATURE: RIG RELEASED. MW: 9.8 VIS: 0 CLEAN PITS. DISP HOLE TO BRINE. POOH. LD/ BHA, DP. RIH W/ RBP TO 600'. SET RBP. DISP W/ DIESEL. POOH. N/D BOPE. SET HGR. N/U DRY HOLE TREE. TEST TREE. INJECT 50 DATE: BBLS DIESEL DN ANNULUS. NOTE: SUSPENDED OPERATIONS. ( dr~superint~ndent ) JUL 2 2 ~994 o~t & Gas cons. Gommissior~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon,__ Suspend xx Operation Shutdown__ Re-enter suspended well__ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __ Change approved program __ Pull tubing Variance__ Perforate __ Other __ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 495' SNL, 1256' EWL, SEC. 14, T12N, R14E, UM At top of productive interval N/A At effective depth 61' SNL, 3424' EWL, SEC. 24, T12N, R14E, UM At total depth 768'SNL, 19'WEL, SEC. 24, T12N, R14E, UM 5. Type of Well: Development X Exploratory __ Stratigraphic __ Service .- ',. 6. Datum elevation (DF or KB) KBE = 43' feet 7. Unit or Property name Point Mclntyre 8. Well number P2-50A 9. Permit number 92-65 10. APl number 50- 029-22261-01 11. Field/Pool Point Mclntyre/Undefined 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 65' Surface 4884' Intermediate Production 15299' Liner Perforation depth: measured None 14600 feet 8247 feet 12225 feet 6986 feet Size 20" 13-3/8" 9-5/8" true vertical Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) Plugs (measured) Cement Plugs 13050'-12720', 12493'-12225' Bridge plug @ 600' Junk (measured) Cemented Measured depth True vertical depth 245 cu ft CS II 55' 55' 3960 cu ft CS II & 4921' 4000' 460 cu fl Class "G" 937 cu fl gel G & 15336' 8799' 690 cu fl Class "G" RECEIVED & Oas Cons. Corrimission Anchorage 13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch x 14. Estimated date for commencing operation 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil Gas Suspended x Service 17. I hereby certify t~t the foregoing is true and correct to the best of my knowledge. Signed : ' . ~ ¢ ~' "-"" Title Drilling Engineer Supervisor FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity .X'. BOP Test__ Location clearance Mechanical Integrity Test__ Subsequent form required 10- Original Signed By Approved by order of the Commission David W. Johnston &pproved fJopy. Returned Form 10-403 Rev 06/15/88 Commissioner I Approval No.¢ ¢,~_/¢_¢~ Date ~-~/~/~: SUBMIT IN TRIPLICATE BP EXPLORATION ARCO Alaska, Inc. To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Date: April 21, 1994 Attention: David W. Johnston Chairman Subject: P2-50A Waiver of requirements 20 AAC 25.110 BP Exploration requests permission to change the status of P2-50A from operation shutdown to a suspended status including a waiver to the requirements of a bridge plug between 200 feet and 300 feet as required in 20 AAC 25.110 This would enable the well to be reentered and sidetracked to a development location for the Pt. Mclntyre field. This work is scheduled for the 1st quarter of 1995 when a larger rig will be located in the Pt. Mcintyre field. Yours Sincerely, Adrian Clark Drilling Engineer Supervisor MS CC. James Deal Well file RECEIVED Oi~ & ~a~ Cons. C0rnmission A~chora§e General Purpose Worksheet Page No. Ely Date AR3B-BpR? RECEIVED Anc~,orago Wellhead Equipment Division - Anchorage /~F~" _5-~ P~r F LAzN G E I AnchoraSe BP EXPLORATION ARCO Alaska, Inc. November 18, 1992 David W. Johnston Chairman Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston: The P2-50A bottom hole location originally submitted, 1021' SNL, 776' EWL, Section 19, T12N, R15E, has been cancelled. The P2-48 well is planned to replace the bottom hole target originally planned for the P2-50A well. Future plans for the P2-50A wellbore will not place the bottom hole location in the same quarter section as the P2-48 bottom hole location while the Point Mclntyre Field is classified as an undefined pool. Yours Sincerely, Mike Zanghi Drilling Engineer Supervisor CC. Terry Jordan Karl Provosnik (ARCO) Well File RECEi /ED Alaska 0ii & Gas Cons. 'AnchOmg~ 0 R 1 IN A AL~-:,...,,A OIL AND GAS CONSERVATION COMMISS,..,,;~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown xx Stimulate__ Plugging Perforate Pull tubing Alter casing Repair well Other 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) ARCO Alaska, Inc. Development X KBE -- 43' feet Exploratory 3. Address Stratigraphic 7. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 Service Point Mclntyre 4. Location of well at surface 8. Well number 495' SNL, 1256' EWL, SEC. 14, T12N, R14E, UM P2-50A At top of productive interval 9. Permit number/approval number N/A 92-65/92-225 At effective depth 10. APl number 61' SNL, 3424' EWL, SEC. 24, T12N, R14E, UM 50- 029-22261-01 At total depth 11. Field/Pool 768' SNL, 19' WEL, SEC. 24, T12N, R14E, UM Point Mclntyre/Undefined 12. Present well condition summary Total depth: measured 14600 feet Plugs (measured) Cement Plugs 13050,'-12720', 12493'-12225' true vertical 8247 feet Bridge plug @ 600 Effective depth: measured 12225 feet Junk (measured) true vertical 6986 feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 65' 20" 245 cu fl CS II 55' 55' Surface 4884' 13-3/8" 3960 cu fl CS II & 4921' 4000' Intermediate 460 cu ft Class "G" Production 15299' 9-5/8" 937cu ft gei G & 15336' 8799' Liner 690 cu fl Class "G" Perforation depth: measured None true vertical Tubing (size, grade, and measured depth) None RECEIVED Packers and 888V (type and measured depth) 13. Stimulation or cement squeeze summary Alaska 0il & Gas Cons. Commission Intervals treated (measured) Anchorage Treatment description including volumes used and final pressure 14. Representative Daily Averaoe Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil Gas Suspended x Service 17. I hereby certify that 1he foregoing is true and correct to the best of my knowledge, Signed /~, ~-,,_ Title Orillin~En~ineerSupervisor Date Form 10-404 Rev SUBMIT IN DUPLICATE BP/AAI SHARED SERVICE WELL: P2-50 A BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD: POINT MCINTYRE LEASE: API: 50- PERMIT: APPROVAL: DAILY OPERATIONS PAGE: 1 ACCEPT: 07/28/92 03:07 SPUD: 08/04/92 09:08 RELEASE: 08/30/92 12:08 OPERATION: DRLG RIG: AUDI 2 WO/C RIG: AUDI 2 07/29/92 (1) TD: 0 PB: 0 07/30/92 (2) TD: 0 PB: 0 POOH W/ BP SET TOOL. MW:10.0 WBM N/U BOPE. TEST BOPE. RETRIVE BP @ 595'. POOH. RIH W/ CIBP TO 13050'. SET BP. DISP W/ BIOZAN MUD. SPOT 17 PPG PILL F/ 12800'-13050'. POOH. POOH W/ SECTION MILL. MW: 9.9 WBM POOH W/ BP SETTING TOOL. RIH W/ SECTION MILL. CUT & MILL CSG F/ 12770'-12835'. CIRC. POOH. 07/31/92 (3) TD: 0 PB: 0 08/01/92 (4) TD: 0 PB: 0 08/02/92 (5) TD: 0 PB: 0 RIH W/ STRING SHOT. MW:10.0 WBM POOH TO 9311'. MILL KNIVES WOULD NOT CLOSE. CIRC PIPE TO 8967'. STUCK R/U ATLAS. RIH W/ CCL & STRING SHOT. 2 ATTEMPTS TO GET STRING SHOT TO BTM. LAST ATTEMPT ONLY GET TO 5750' RIH W/ JAR ASS'Y. MW:10.0 WBM RIH W/ CCL/STRING SHOT. WORK TO 8285'. APPLY TORQ. FIRE SHOT. BACK OFF. POOH W/ W/L. R/D ATLAS. CIRC. POOH. RECOVER 1 JT HWDP. RIH W/ FTA #1. RIH W/ BLADED MILL. MW:10.0 WBM RIH TO 8312'. CIRC. SCREW INTO FISH. JAR FREE. PUMP OUT OF HOLE. SECTION MILL CLEAN. RIH W/ BLADED MILL. 08/03/92 (6) TD: 0 PB: 0 POOH W/ BLADED MILL. MW:10.0 WBM RIH W/ MILL TO 4000'. CBU. RIH TO 6000'. CBU. WASH & REAM TO 13000'. CIRC. POOH W/ MILL. 08/04/92 (7) TD: 0 PB: 0 08/05/92 (8) TD:12810' (12810) P/U DRLG ASS'Y #1. MW:10.0 WBM POOH W/ BLADED MILL. RIH W/ MULE SHOE TO 13000' ATTEMPT TO REV CIRC. CIRC. R/U BJ. PUMP 16 BBLS WATER, 250 SX (45 BBLS) 'G' CMT @ 15.8 PPG. POOH 16 STDS TO 11500' SQZ CMT W/ 1300 PSI. POOH. P/U BHA #1. DRLG. MW: 9.9 VIS: 67 RIH W/ BIT TO 7450'. TEST CSG. OK. RIH TO 11800' TAG CMT. DRLG CMT F/ 11800'-12041. CIRC. DRLG F/ 12041'-12774' KICK OFF @ 21:30 HRS, 8/4/92. DRLG F/ 12774'-12810'. WELL : P2-50 A OPERATION: RIG : AUDI 2 PAGE: 2 08/06/92 (9) TD:12873' ( 63) 08/07/92 (10) TD:13155' ( 282) 08/08/92 (11) TD:13655' ( 500) DISP WELL W/ OBM MW: 9.9 VIS: 57 DRLG TO 12873' CIRC. HOLE COLLAPSED. WORK PIPE THRU COLLAPSED HOLE. PUMP VISCOUS SLUGS. WASH TO BTM F/ 12580'-12873'. CBU. POOH TO 6500' CIRC. RIH TO BTM. REAM 30' TO BTM. CIRC. DISP WELL W/ LVT-200. DRLG. MW:10.0 VIS: 71 DISP WELL TO VERSA-CORE OBM. CLEAN PITS. WASH TO BTM. DRLG F/ 12873'-13155' DRLG. DRLG F/ 13155'-13655'. MW: 9.9 VIS: 71 08/09/92 (12) TD:14350' ( 695) DRLG. DRLG F/ 13655'-14350'. MW: 9.9 VIS: 74 08/10/92 (13) TD:14600' ( 250) 08/11/92 (14) TD:14600' ( 0) 08/12/92 (15) TD:14600' ( 0) 08/13/92 (16) TD:12804' ( 0) 08/14/92 (17) TD:12967' ( 163) 08/15/92 (18) TD:12998' ( 31) POOH. MW:10.0 VIS: 78 DRLG TO 14600'. CBU. POOH TO WINDOW. CIRC. REAM @ WINDOW. RIH. REAM F/ 12877'-12996'. POOH. TIH W/MILLS MW:10.2 VIS: 78 POH WET W/TIGHT DP CONNECTIONS, SET BACK BHA & DOWNLOAD MWD, LOGGING TOOL FAILURE W/INTERNAL WIRING, TEST BOPE, P/U NEW BIT,MOTOR & MWD & RIH TO 6000', RIG SERVICE, CBU, HOLE UNLOADED A SMALL AMT CTGS, RIH TO 12700', WORK DOWN TO WINDOW & ATTEMPT TO CLEAN OUT TO SIDETRACK, HIT OBSTRUCTION @ 12825', EVENTUALLY WORKED PAST TO 12835', STOPPED AGAIN @ 12860', WORKED PAST TO 12892', NO MOVEMENT OR PROGRESS, POH, M/U MILLING ASSEMB. TO CLEAN OUT THE WINDOW CHANGING BHA MW:10.3 VIS: 94 RIH TO 12770, MILLED, POH. ST HIGH. CBU. TOH W/MILL, TIGHT CONN. PU BHA & TIH. SERV RIG. CONT TIH TO 12770. UNABLE TO MILL. UNABLE TO GET INTO EITHER SIDETRACK. POH, CBU. TOH, LD BHA. CONTROL DRLG MW:10.2 VIS: 81 FINISHED BHA & ORIENTED TELECO. CUR & SLIP DRL LINE. TIH, CONTROLLED DRLG TO 12804. RIH TO CMT. MW:10.2 VIS: 83 DRLG F/ 12804'-12967'. POOH TO 12800'. HIT CSG STUB. ATTEMPT TO WORK BACK INTO SIDETRACK. WORK PAST STUB @ 12908' POOH ABOVE WINDOW. CIRC. POOH. RIH W/ MULESHOE, 3-1/2" DP. CIRC. MW:10.0 VIS: 50 RIH. PLUGGED DP. POOH. RIH W/ 5"X5" CMT STINGER TO 12770'. WASH TO 12998'. CIRC SWEEP. CIRC CORE FLUID. WELL : P2-50 A OPERATION: RIG : AUDI 2 PAGE: 3 08/16/92 (19) TD:12998' ( 0) 08/17/92 (20) TD:12772' ( 0) 08/18/92 (21) TD:12720' ( 0) 08/19/92 (22) TD:12397' ( 0) 08/20/92 (23) TD:12455' ( 58) 08/21/92 (24) TD:12455' ( 0) 08/22/92 (25) TD:12455' ( 0) 08/23/92 (26) TD:12455' ( 0) RIH W/ BHA #7. MW:10.0 VIS: 43 CIRC. PUMP 16 BBLS 2% CAUSTIC WATER, 16 BBLS ARCO SPACER, 300 SX (51 BBLS) 'G' CMT W/ .5% CD-31, .05% R-l, 1MGHS FP-6L. PUMP 4 BBLS ARCO SPACER, 4 BBLS 2% CAUSTIC WATER, 190 BBLS MUD. POOH 15 STDS. CIRC. POOH. RIH W/ BHA #7. CBU. MW:10.0 VIS: 46 RIH TO 11720'. WASH CMT TO 12505' POOH TO 11477' WASH & REAM F/ 11477'-12699'. DRLG CMT TO 12772' POOH. RIH W/ MOD CMT STINGER. DRLG HARD CMT. MW:10.1 VIS: 40 CBU. WASH F/ 12770'-12835'. CIRC. PUMP 16 BBLS 2% CAUSTIC WATER, 63 BBLS (350 SX) CMT SLURRY, 2 BBLS WATER, 4 BBLS CAUSTIC WATER. DISP W/ MUD. POOH 20 STDS. CIRC. POOH. TEST BOPE. RIH. TAG CMT STRINGERS @ 1~318'i REAM STRINGERS F/ 11318'-11957'. DRLG CMT F/ 11957 -125U0'. NOTE: NEW EFC REFLECTS EXPECTED COSTS TO CUT NEW SECTION AND SIDETRACK WELL. PREVIOUS SIDETRACK ABANDONED. MILLING SECTION MW:10.0 VIS:126 DRILL HARD CMT. CIRC & COND MUD. POH, RIH. SLIP & CUT DRIL LINE. RIH. CIRC & COND MUD. MILLING SECTION TO 12397. NOTE: NEW EFC REFLECTS EXPECTED COSTS TO CUT NEW SECTION & ST WELL. SIDETRACK OPERATION ABANDONED. POH MW:10.0 VIS:155 MILLED TO 12455. METAL RETURNS. PUMP HI-VIS SWEEPS TO CLEAN HOLE. WORKED MILL THROUGH. HOLE PACKED OFF WHEN ATTMPT TO CIRC. RIH, ROTATE & EST CIRC. POH. WILL CIRC AS NEEDED TO WORK MILL OUT OF HOLE. R/U ATLAS. MW: 9.9 VIS:ll6 POOH W/ MILL TO 9843'. CIRC. JAR. ROTATE. WORK OUT 2 STDS. JAR. POOH. DRILL STRING PARTED. CIRC. POOH. L/D PARTED JT. RIH W/ OVERSHOT FTA. LATCH FISH @ 2574' ATTEMPT TO CIRC. NO GO. R/U ATLAS FOR STRING SHOT. ATTEMPT BACKOFF. MW:10.0 VIS:120 RUN BACKOFF SHOT TO 4299'. POOH. R/D W/L. CIRC. POOH. RIH W/ SCREW IN SUB. CIRC. SCREW INTO FISH @ 4299'_ JAR. MILL MOVE UP HOLE TO 8929'. CIRC. R/U ATLAS. RIH W/ STRING SHOT TO 8800'. ATTEMPT BACKOFF. WORK STUCK PIPE. MW:10.0 VIS: 40 SCREW INTO FISH. ATTEMPT BACKOFF @ 8809'. R/D ATLAS. CIRC. BACKOFF. HOLE PACKED OFF. JAR. PIPE FREE. POOH TO 4299' PUMP OUT OF HOLE. PIPE STUCK @ 781' WELL : P2-50 A OPERATION: RIG : AUDI 2 PAGE: 4 08/24/92 (27) TD:12455' ( 0) 08/25/92 (28) TD:12455' ( 0) 08/26/92 (29) TD:12455' ( 0) 08/27/92 (30) TD:12455' ( 0) 08/28/92 (31) TD:12455' ( 0) 08/29/92 (32) TD:12275' ( 0) 08/30/92 (33) TD:12275' ( 0) CLEAN BOPE. MW:10.0 VIS: 40 WORK STUCK PIPE. R/U ATLAS. RUN CCL. BTM OF FISH @ 805'. RUN FREEPOINT. RIH W/ STRING SHOT. FIRE. NO GO. RIH W/ STRING SHOT. BACKOFF. R/D ATLAS. POOH. RIH W/ FTA. LOCATE FISH @ 531' SCREW INTO FISH. JAR. WORK FISH TO FLOOR. L/D FISH. CLEAN BOPE. LOOK FOR FISH. MW: 9.9 VIS: 40 CLEAN BOPE. RIH W/ MILL. WASH TO 4155'. REAM TOP 6360'. CIRC. WASH & REAM TO 10' ABOVE FISH. LOOKING FOR FISH. CURRENTLY @ 12157'. RIH W/ BHA #12. MW: 9.9 VIS: 89 REAM TO 12164'. TOF @ 12164' CIRC. POOH TO 6500'. CIRC. CIRC & POOH TO 5500' CIRC. POOH. TEST BOPE. RIH W/ BHA #12. POOH W/ FISH. MW: 9.9 VIS: 76 CIRC @ 6500' RIH TO 12164' CIRC. POOH TO 6500' CIRC. POOH. L/D BHA. RIH W/ SCREW IN SUB. CIRC. ENGAGE FISH. ROTATE & WORK FISH UP HOLE. POOH. WOC. MW: 9.9 VIS: 48 POOH. L/D FISH. RIH W/ CMT STINGER. CBU @ 6500' RIH TO 12375'. WASH TO 14493' CIRC. PUMP 2 BBLS WATER, 16 BBLS 2% CAUSTIC WATER, 400 SX (72 BBLS) 'G' CMT @ 16.8 PPG. DISP W/ WATER, MUD. POOH 15 STDS. DROP BALL & CIRC. POOH. L/D CMT STINGER. WOC. CLEAN PITS. INJECT MUD. MW: 9.9 VIS: 97 CLEAN PITS. WOC. L/D BHA. RIH W/ BHA. TAG CMT @ 11264'. DRLG CMT TO 12175' ATTEMPT WT TEST. NO GO. DRLG CMT F/ 12175'-12225'. TEST CMT W/ WT. CIRC. INJECT MUD. RIG RELEASED. MW: 9.8 VIS: 0 CLEAN PITS. DISP HOLE TO BRINE. POOH. LD/ BHA, DP. RIH W/ RBP TO 600'. SET RBP. DISP W/ DIESEL. POOH. N/D BOPE. SET HGR. N/U DRY HOLE TREE. TEST TREE. INJECT 50 BBLS DIESEL DN ANNULUS. NOTE: SUSPENDED OPERATIONS. SIGNATURE: (drilling superintendent) DATE: ,General Purpose Worksheet ~t~u~'~c' '~- soA ' IFile IPage No. By IDate PRUDHOE BAY DRILLING SURVEY LISTING Page 1 Point McIntyre (Pad #2),2-50A Your ref : PMSS <12997-14498'> Prudhoe Bay,North Slope, Alaska Last revised : 31-Aug-92 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100Ft Sect 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 385.00 0.30 234.20 385.00 0.59 S 0.82 W 0.08 -0.36 636.00 1.10 131.20 635.98 2.56 S 0.46 E 0.48 1.78 817.00 4.90 121.40 816.70 7.73 S 8.37 E 2.11 11.24 ft 7.00 6.50 116.40 995.81 16.27 S 24.06 E 0.93 29.04 1181.00 10.30 123.10 1177.80 29.89 S 47.18 E 2.13 55.84 1368.00 10.50 122.10 1361.73 48.07 S 75.62 E 0.14 89.60 1554.00 12.20 124.20 1544.09 68.13 S 106.23 E 0.94 126.20 1740.00 13.70 122.80 1725.35 91.11 S 141.00 E 0.82 167.87 1928.00 19.90 119.90 1905.24 119.14 S 187.50 E 3.33 222.14 2116.00 22.10 122.10 2080.75 153.89 S 245.20 E 1.24 289.45 2304.00 22.30 123.80 2254.82 192.53 S 304.80 E 0.36 360.48 2491.00 25.60 122.80 2425.69 234.16 S 368.26 E 1.78 436.38 2679.00 30.10 123.50 2591.87 282.21 S 441.75 E 2.40 524.18 2866.00 33.80 122.10 2750.52 335.75 S 524.94 E 2.02 623.11 3053.00 38.80 122.40 2901.18 394.82 S 618.53 E 2.68 733.77 3239.00 41.20 122.80 3043.66 459.24 S 719.24 E 1.30 853.31 3427.00 46.40 123.10 3179.30 530.00 S 828.39 E 2.77 983.39 36%2.00 47.50 124.90 3305.59 605.61 S 940.44 E 0.93 1118.55 ~ ]'00 50.00 121.40 3428.24 681.98 S 1057.53 E 1.95 1258.34 3984.00 54.00 118.90 3542.74 755.50 S 1184.27 E 2.40 1404.66 4170.00 59.20 120.30 3645.10 832.22 S 1319.20 E 2.86 1559.60 4356.00 61.60 119.20 3736.97 912.44 S 1459.61 E 1.39 1721.04 4541.00 62.10 122.40 3824.26 995.96 S 1599.69 E 1.55 1883.99 4865.00 67.50 118.90 3962.20 1145.16 S 1851.85 E 1.93 2176.71 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska Measured Inclin. Azimuth True Vert. R E C Depth Degrees Degrees Depth C O O SURVEY LISTING Page 2 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 T A N G U L A R Dogleg Vert R D I N A T E S Deg/100Ft Sect 5119.00 66.30 116.80 4061.86 1254.31 S 2058.40 E 0.90 2409.35 5399.00 64.90 121.70 4177.59 1378.80 S 2280.81 E 1.67 2663.66 5678.00 63.90 121.40 4298.14 1510.45 S 2495.22 E 0.37 2915.17 5958.00 65.80 123.50 4417.14 1646.46 S 2709.06 E 0.96 3168.58 ~ 9.00 66.20 124.20 4531.44 1789.45 S 2922.25 E 0.27 3425.26 6522.00 65.00 124.50 4648.34 1934.86 S 3135.03 E 0.43 3682.92 6803.00 65.60 123.80 4765.76 2078.17 S 3346.30 E 0.31 3938.16 7085.00 64.20 124.20 4885.38 2220.96 S 3558.00 E 0.51 4193.49 7365.00 65.00 123.50 5005.49 2361.84 S 3768.07 E 0.36 4446.40 7647.00 66.40 124.20 5121.53 2505.01 S 3981.50 E 0.54 4703.39 7928.00 66.40 123.80 5234.03 2649.00 S 4194.98 E 0.13 4960.85 8209.00 65.80 124.50 5347.88 2793.21 S 4407.59 E 0.31 5217.71 8488.00 65.60 125.20 5462.69 2938.51 S 4616.26 E 0.24 5471.87 8771.00 65.80 123.50 5579.16 3084.04 S 4829.20 E 0.55 5729.72 9053.00 65.70 124.50 5694.98 3227.81 S 5042.36 E 0.32 5986.80 9332.00 65.30 125.90 5810.68 3374.15 S 5249.81 E 0.48 6240.50 9609.00 66.60 127.00 5923.57 3524.44 S 5453.26 E 0.59 6493.01 9923.00 67.30 124.50 6046.53 3693.21 S 5687.73 E 0.76 6781.60 10~J66.00 65.20 121.00 6184.70 3863.07 S 5951.67 E 1.12 7095.46 1~ ~.00 65.70 123.10 6302.29 3999.67 S 6169.83 E 0.70 7352.81 10828.00 66.50 123.80 6415.33 4140.27 S 6382.65 E 0.37 7607.88 11113.00 65.70 123.80 6530.79 4285.22 S 6599.17 E 0.28 7868.42 11486.00 66.40 123.10 6682.21 4473.11 S 6883.60 E 0.25 8209.30 11770.00 65.60 123.50 6797.72 4615.55 S 7100.44 E 0.31 8468.74 12050.00 65.60 123.50 6913.39 4756.29 S 7313.08 E 0.00 8723.72 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska Measured Depth Inclin. Azimuth Degrees Degrees 12332.00 65.60 123.10 12616.00 66.20 123.50 12997.00 62.10 119.90 13185.00 60.30 114.30 1~" ~.00 59.00 109.80 13562.00 56.30 105.50 13750.00 52.60 102.70 13937.00 52.00 102.00 14126.00 49.80 97.80 14313.00 49.70 98.90 SURVEY LISTING Page 3 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 True Vert. R E C T A N G U L A R Dogleg Vert Depth C O O R D I N A T E S Deg/100Ft Sect 14498.00 50.20 7029.89 4897.29 S 7527.72 E 0.13 8980.53 7145.85 5039.62 S 7744.40 E 0.25 9239.77 7311.98 5219.87 S 8035.89 E 1.37 9582.40 7402.60 5294.94 S 8182.43 E 2.78 9746.15 7497.63 5355.86 S 8332.72 E 2.18 9905.33 7598.79 5404.33 S 8484.77 E 2.39 10059.19 7708.09 5441.66 S 8633.05 E 2.31 10203.80 7822.44 5473.31 S 8777.58 E 0.44 10342.17 7941.67 5498.60 S 8921.99 E 2.08 10476.96 8062.49 5519.32 S 9063.20 E 0.45 10606.58 97.80 8181.54 5539.88 S 9203.31 E 0.53 10735.19 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. 6324/6116 Nielson Way · Anchorage, AK 99518 Phone: (907) 563-3269/Fax: (907) 563-5865 Phone: (907) 562-2646 / Fax: (907) 561-1358 EASTMAN TELECO MWD SURVEY WELL #2-50A POINT MCINTYRE (PAD #2) Eastman Teleco appreciates the opportunity to provide our services. Please find attached a copy of the directional surveys in each of the following formats' · MWD Survey Listing · Composite 100' MD Interpolated · Composite 100' TVD Interpolated ORIGINAL RECEIVED · .; OCT 2 0 1992 Alaska 0il & Gas'Cons. Commission Anchorage PRUDHOE BAY DRILLING Point McIntyre (Pad #2) 2-50A slot #2-50 Prudhoe Bay North Slope, Alaska SURVEY LISTING Your ref : PMSS <12997-14498'> Our ref : svy3449 Other ref : Date printed : 31-Aug-92 Date created : 31-Aug-92 Last revised : 31-Aug-92 Field is centred on n70 18 1.316,w148 39 38.799 Structure is centred on 0.000,0.000,999.00000,N MWD SURVEY LISTING PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 1 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100Ft Sect 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 385.00 0.30 234.20 385.00 0.59 S 0.82 W 0.08 -0.36 636.00 1.10 131.20 635.98 2.56 S 0.46 E 0.48 1.78 817.00 4.90 121.40 816.70 7.73 S 8.37 E 2.11 11.24 97.00 6.50 116.40 995.81 16.27 S 24.06 E 0.93 29.04 1181.00 10.30 123.10 1177.80 29.89 S 47.18 E 2.13 55.84 1368.00 10.50 122.10 1361.73 48.07 S 75.62 E 0.14 89.60 1554.00 12.20 124.20 1544.09 68.13 S 106.23 E 0.94 126.20 1740.00 13.70 122.80 1725.35 91.11 S 141.00 E 0.82 167.87 1928.00 19.90 119.90 1905.24 119.14 S 187.50 E 3.33 222.14 2116.00 22.10 122.10 2080.75 153.89 S 245.20 E 1.24 289.45 2304.00 22.30 123.80 2254.82 192.53 S 304.80 E 0.36 360.48 2491.00 25.60 122.80 2425.69 234.16 S 368.26 E 1.78 436.38 2679.00 30.10 123.50 2591.87 282.21 S 441.75 E 2.40 524.18 2866.00 33.80 122.10 2750.52 335.75 S 524.94 E 2.02 623.11 3053.00 38.80 122.40 2901.18 394.82 S 618.53 E 2.68 733.77 3239.00 41.20 122.80 3043.66 459.24 S 719.24 E 1.30 853.31 3427.00 46.40 123.10 3179.30 530.00 S 828.39 E 2.77 983.39 ~3612.00 47.50 124.90 3305.59 605.61 S 940.44 E 0.93 1118.55 '98.00 50.00 121.40 3428.24 681.98 S 1057.53 E 1.95 1258.34 3984.00 54.00 118.90 3542.74 755.50 S 1184.27 E 2.40 1404.66 4170.00 59.20 120.30 3645.10 832.22 S 1319.20 E 2.86 1559.60 4356.00 61.60 119.20 3736.97 912.44 S 1459.61 E 1.39 1721.04 4541.00 62.10 122.40 3824.26 995.96 S 1599.69 E 1.55 1883.99 4865.00 67.50 118.90 3962.20 1145.16 S 1851.85 E 1.93 2176.71 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 2 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100Ft Sect 5119.00 66.30 116.80 4061.86 1254.31 S 2058.40 E 0.90 2409.35 5399.00 64.90 121.70 4177.59 1378.80 S 2280.81 E 1.67 2663.66 5678.00 63.90 121.40 4298.14 1510.45 S 2495.22 E 0.37 2915.17 ~958.00 65.80 123.50 4417.14 1646.46 S 2709.06 E 0.96 3168.58 39.00 66.20 124.20 4531.44 1789.45 S 2922.25 E 0.27 3425.26 6522.00 65.00 124.50 4648.34 1934.86 S 3135.03 E 0.43 3682.92 6803.00 65.60 123.80 4765.76 2078.17 S 3346.30 E 0.31 3938.16 7085.00 64.20 124.20 4885.38 2220.96 S 3558.00 E 0.51 4193.49 7365.00 65.00 123.50 5005.49 2361.84 S 3768.07 E 0.36 4446.40 7647.00 66.40 124.20 5121.53 2505.01 S 3981.50 E 0.54 4703.39 7928.00 66.40 123.80 5234.03 2649.00 S 4194.98 E 0.13 4960.85 8209.00 65.80 124.50 5347.88 2793.21 S 4407.59 E 0.31 5217.71 8488.00 65.60 125.20 5462.69 2938.51 S 4616.26 E 0.24 5471.87 8771.00 65.80 123.50 5579.16 3084.04 S 4829.20 E 0.55 5729.72 9053.00 65.70 124.50 5694.98 3227.81 S 5042.36 E 0.32 5986.80 9332.00 65.30 125.90 5810.68 3374.15 S 5249.81 E 0.48 6240.50 9609.00 66.60 127.00 5923.57 3524.44 S 5453.26 E 0.59 6493.01 9923.00 67.30 124.50 6046.53 3693.21 S 5687.73 E 0.76 6781.60 ~0266.00 65.20 121.00 6184.70 3863.07 S 5951.67 E 1.12 7095.46  '49.00 65.70 123.10 6302.29 3999.67 S 6169.83 E 0.70 7352.81 10828.00 66.50 123.80 6415.33 4140.27 S 6382.65 E 0.37 7607.88 11113.00 65.70 123.80 6530.79 4285.22 S 6599.17 E 0.28 7868.42 11486.00 66.40 123.10 6682.21 4473.11 S 6883.60 E 0.25 8209.30 11770.00 65.60 123.50 6797.72 4615.55 S 7100.44 E 0.31 8468.74 12050.00 65.60 123.50 6913.39 4756.29 S 7313.08 E 0.00 8723.72 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska Measured Inclin. Azimuth True Vert. R E C Depth Degrees Degrees Depth C O O SURVEY LISTING Page 3 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 T A N G U L A R Dogleg Vert R D I N A T E S Deg/100Ft Sect 12332.00 65.60 123.10 7029.89 4897.29 S 7527.72 E 0.13 8980.53 12616.00 66.20 123.50 7145.85 5039.62 S 7744.40 E 0.25 9239.77 12997.00 62.10 119.90 7311.98 5219.87 S 8035.89 E 1.37 9582..40 1~185.00 60.30 114.30 7402.60 5294.94 S 8182.43 E 2.78 9746.15 i 73.00 59.00 109.80 7497.63 5355.86 S 8332.72 E 2.18 9905.33 13562.00 56.30 105.50 7598.79 5404.33 S 8484.77 E 2.39 10059.19 13750.00 52.60 102.70 7708.09 5441.66 S 8633.05 E 2.31 10203.80 13937.00 52.00 102.00 7822.44 5473.31 S 8777.58 E 0.44 10342.17 14126.00 49.80 97.80 7941.67 5498.60 S 8921.99 E 2.08 10476.96 14313.00 49.70 98.90 8062.49 5519.32 S 9063.20 E 0.45 10606.58 14498.00 50.20 97.80 8181.54 5539.88 S 9203.31 E 0.53 10735.19 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. COMPOSITE 100' MD INTERPOLATED PRUDHOE BAY DRILLING SURVEY LISTING Page 1 Point McIntyre (Pad #2),2-50A Your ref : PMSS <12997-14498'> Prudhoe Bay,North Slope, Alaska Last revised : 31-Aug-92 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100Ft Sect 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 100.00 0.08 234.20 100.00 0.04 S 0.06 W 0.08 -0.02 200.00 0.16 234.20 200.00 0.16 S 0.22 W 0.08 -0.10 300.00 0.23 234.20 300.00 0.36 S 0.50 W 0.08 -0.22 00.00 0.27 220.72 400.00 0.64 S 0.87 W 0.48 -0.38 500.00 0.49 149.92 500.00 1.19 S 0.81 W 0.48 -0.03 600.01 0.93 133.77 600.00 2.13 S 0.01 W 0.48 1.16 700.05 2.44 124.25 700.00 3.73 S 2.05 E 2.11 3.76 800.24 4.55 121.62 800.00 7.01 S 7.19 E 2.11 9.86 900.65 5.64 118.72 900.00 11.57 S 15.02 E 0.93 18.90 1001.22 6.58 116.64 1000.00 16.48 S 24.49 E 2.13 29.52 1102.12 8.66 120.94 1100.00 22.98 S 36.18 E 2.13 42.86 1203.56 10.32 122.98 1200.00 32.09 S 50.56 E 0.14 59.88 1305.22 10.43 122.43 1300.00 41.99 S 65.97 E 0.14 78.20 1406.94 10.85 122.59 1400.00 51.94 S 81.71 E 0.94 96.81 1508.93 11.79 123.75 1500.00 62.89 S 98.46 E 0.94 116.83 1611.25 12.66 123.73 1600.00 75.01 S 116.45 E 0.82 138.52 1713.92 13.49 122.98 1700.00 87.78 S 135.85 E 0.82 161.74 1817.28 16.24 121.35 1800.00 101.69 S 157.93 E 3.33 187.83 ~22.42 19.72 119.96 1900.00 118.20 S 185.86 E 3.33 220.25 2029.16 21.08 121.14 2000.00 137.14 S 217.99 E 1.24 257.51 2136.78 22.12 122.29 2100.00 158.06 S 251.82 E 0.36 297.27 2244.77 22.24 123.27 2200.00 180.13 S 286.09 E 0.36 338.03 2352.99 23.16 123.51 2300.00 203.02 S 320.56 E 1.78 379.41 2462.57 25.10 122.94 2400.00 227.56 S 358.04 E 1.78 424.20 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 2 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 Measured Depth 2574.10 2688.40 2805.62 7926.12 51.48 Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Degrees Degrees Depth C O O R D I N A T E S Deg/100Ft Sect 27.59 123.14 2500.00 254.41 S 399.47 E 2.40 473.58 30.28 123.42 2600.00 284.82 S 445.69 E 2.02 528.90 32.60 122.52 2700.00 318.08 S 497.00 E 2.02 590.05 35.41 122.20 2800.00 353.92 S 553.85 E 2.68 657.24 38.76 122.40 2900.00 394.31 S 617.73 E 2.68 732.82 3181.31 3315.13 3457.06 3603.73 3754.34 3912.60 4084.86 4279.49 4489.27 4710.80 4962.81 5212.96 5451.65 ..5.682.23 ( 16.41 6161.27 6406.55 6644.84 6885.23 7118.64 40.46 122.68 3000.00 438.84 S 687.51 E 1.30 815.60 43.30 122.93 3100.00 487.01 S 762.23 E 2.77 904.50 46.58 123.40 3200.00 541.96 S 846.62 E 0.93 1005.20 47.45 124.82 3300.00 602.12 S 935.44 E 0.93 1112.46 49.40 122.20 3400.00 664.43 S 1029.22 E 1.95 1225.05 52.46 119.83 3500.00 727.46 S 1134.42 E 2.40 1347.59 56.82 119.68 3600.00 796.12 S 1256.67 E 2.86 1487.51 60.61 119.65 3700.00 879.54 S 1401.26 E 1.39 1654.19 61.95 121.51 3800.00 971.78 S 1560.93 E 1.55 1838.32 64.92 120.53 3900.00 1075.24 S 1729.31 E 1.93 2035.88 67.03 118.10 4000.00 1188.20 S 1931.13 E 0.90 2266.64 65.81 118.43 4100.00 1294.11 S 2134.49 E 1.67 2494.83 64.71 121.64 4200.00 1403.81 S 2321.36 E 0.37 2711.28 63.93 121.43 4300.00 1512.43 S 2498.47 E 0.96 2918.97 65.52 123.19 4400.00 1625.63 S 2677.41 E 0.96 3130.69 66.09 124.01 4500.00 1749.59 S 2863.39 E 0.27 3354.19 65.49 124.38 4600.00 1875.58 S 3048.56 E 0.43 3578.11 65.26 124.19 4700.00 1997.74 S 3227.04 E 0.31 3794.34 65.19 123.92 4800.00 2119.82 S 3408.38 E 0.51 4012.92 64.30 124.12 4900.00 2237.97 S 3583.08 E 0.36 4223.79 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska Measured Depth 7352.02 7593.50 7843.00 ~091.64 ( 35.93 8578.42 8821.83 9065.19 9306.41 9549.98 Inclin. Azimuth Degrees Degrees True Vert. Depth 64.96 123.53 5000.00 66.13 124.07 5100.00 66.40 123.92 5200.00 66.05 124.21 5300.00 65.71 124.82 5400.00 65.66 124.66 5500.00 65.78 123.68 5600.00 65.68 124.56 5700.00 65.34 125.77 5800.00 66.32 126.77 5900.00 SURVEY LISTING Page 3 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 R E C T A N G U L A R Dogleg Vert C 00 R D I N A T E S Deg/100Ft Sect 2355.35 S 3758.26 E 0.36 4434.64 2477.53 S 3940.97 E 0.54 4654.42 2605.60 S 4130.30 E 0.13 4882.96 2732.75 S 4319.12 E 0.31 5110.58 2859.03 S 4502.78 E 0.24 5333.40 2985.67 S 4683.79 E 0.55 5554.19 3109.69 S 4867.82 E 0.32 5776.08 3234.11 S 5051.51 E 0.48 5997.91 3360.54 S 5230.96 E 0.48 6217.28 3491.96 S 5409.98 E 0.59 6439.01 9803.11 10059.16 10302.52 10543.43 10789.64 67.03 125.45 6000.00 66.46 123.12 6100.00 65.26 121.27 6200.00 65.69 123.06 6300.00 66.39 123.70 6400.00 3629.88 S 5597.20 E 0.76 6671.16 3762.90 S 5791.77 E 1.12 6906.81 3880.22 S 5980.05 E 0.70 7128.60 3996.90 S 6165.58 E 0.70 7347.74 4120.74 S 6353.42 E 0.37 7572.72 11037.87 11282.22 11530.33 1~775.52 ~17.59 · 12259.66 12502.91 12746.54 12971.28 13179.74 65.91 123.80 6500.00 66.02 123.48 6600.00 66.28 123.16 6700.00 65.60 123.50 6800.00 65.60 123.50 6900.00 65.60 123.20 7000.00 65.96 123.34 7100.00 64.78 122.29 7200.00 62.37 120.15 7300.00 60.35 114.46 7400.00 4247.10 S 6542.22 E 0.28 7799.89 4370.77 S 6727.73 E 0.25 8022.83 4495.31 S 6917.60 E 0.31 8249.90 4618.32 S 7104.63 E 0.00 8473.76 4740.00 S 7288.46 E 0.00 8694.20 4861.26 S 7472.56 E 0.13 8914.65 4982.68 S 7658.12 E 0.25 9136.40 5104.13 S 7844.12 E 1.37 9358.54 5208.48 S 8016.18 E 1.37 9559.67 5293.05 S 8178.27 E 2.78 9741.64 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 4 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100Ft Sect 13377.59 58.93 13564.18 56.26 13736.64 52.86 1~900.50 52.12 v 109.70 7500.00 105.47 7600.00 102.91 7700.00 102.14 7800.00 99.28 7900.00 5357.18 S 8336.43 E 5404.81 S 8486.52 E 5439.31 S 8622.69 E 5467.29 S 8749.43 E 5491.18 S 8872.59 E 2.39 9909.16 2.31 10060.92 2.31 10193.83 0.44 10315.30 2.08 10431.52 14216.33 49.75 14371.08 49.86 98.33 8000.00 98.55 8100.00 5508.28 S 8990.28 E 5526.05 S 9107.03 E 0.45 10539.45 0.53 10646.98 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. COMPOSITE 100' TVD INTERPOLATED PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 1 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100Ft Sect 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 100.00 0.08 234.20 100.00 0.04 S 0.06 W 0.08 -0.02 200.00 0.16 234.20 200.00 0.16 S 0.22 W 0.08 -0.10 q00.00 0.23 234.20 300.00 0.36 S 0.50 W 0.08 -0.22 00.00 0.27 220.72 400.00 0.64 S 0.87 W 0.48 -0.38 500.00 0.49 149.92 500.00 1.19 S 0.81 W 0.48 -0.03 600.00 0.93 133.77 599.99 2.13 S 0.01 W 0.48 1.16 700.00 2.44 124.25 699.95 3.73 S 2.05 E 2.11 3.75 800.00 4.54 121.62 799.76 7.00 S 7.18 E 2.11 9.84 900.00 5.63 118.74 899.35 11.54 S 14.97 E 0.93 18.84 1000.00 6.56 116.57 998.79 16.42 S 24.36 E 2.13 29.38 1100.00 8.61 120.87 1097.91 22.82 S 35.90 E 2.13 42.54 1200.00 10.32 123.00 1196.50 31.74 S 50.03 E 0.14 59.24 1300.00 10.43 122.46 1294.86 41.48 S 65.18 E 0.14 77.25 1400.00 10.79 122.51 1393.18 51.23 S 80.61 E 0.94 95.51 1500.00 11.70 123.65 1491.26 61.89 S 96.95 E 0.94 115.01 1600.00 12.57 123.82 1589.02 73.65 S 114.41 E 0.82 136.06 1700.00 13.38 123.08 1686.46 86.02 S 133.14 E 0.82 158.51 .~800.00 15.67 121.63 1783.39 99.21 S 153.88 E 3.33 183.08  00.00 18.97 120.22 1878.84 114.48 S 179.43 E 3.33 212.83 2000.00 20.74 120.80 1972.76 131.78 S 209.07 E 1.24 247.11 2100.00 21.91 121.93 2065.92 150.71 S 240.12 E 1.24 283.46 2200.00 22.19 122.86 2158.55 170.90 S 271.91 E 0.36 321.11 2300.00 22.30 123.76 2251.11 191.68 S 303.54 E 0.36 358.96 2400.00 23.99 123.25 2343.08 213.36 S 336.26 E 1.78 398.21 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 2 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100Ft Sect 2500.00 25.82 122.84 2433.80 236.28 S 371.54 E 2.40 440.28 2600.00 28.21 123.23 2522.88 261.04 S 409.61 E 2.40 485.69 2700.00 30.51 123.33 2610.00 288.04 S 450.60 E 2.02 534.77 ~q00.00 32.49 122.56 2695.26 316.45 S 494.45 E 2.02 587.03 00.00 34.71 122.16 2778.62 345.93 S 541.15 E 2.68 642.24 3000.00 37.38 122.32 2859.47 377.32 S 590.91 E 2.68 701.08 3100.00 39.41 122.50 2937.65 410.73 S 643.55 E 1.30 763.41 3200.00 40.70 122.72 3014.20 445.41 S 697.75 E 1.30 827.75 3300.00 42.89 122.90 3088.95 481.40 S 753.56 E 2.77 894.16 3400.00 45.65 123.06 3160.55 519.40 S 812.10 E 2.77 963.96 3500.00 46.83 123.82 3229.44 559.25 S 872.65 E 0.93 1036.44 3600.00 47.43 124.78 3297.48 600.56 S 933.19 E 0.93 1109.71 3700.00 48.67 123.21 3364.38 642.27 S 994.70 E 1.95 1184.02 3800.00 50.04 121.37 3429.53 682.78 S 1058.83 E 2.40 1259.87 3900.00 52.19 120.00 3492.30 722.48 S 1125.78 E 2.40 1337.64 4000.00 54.45 119.03 3552.10 761.78 S 1195.62 E 2.86 1417.61 4100.00 57.24 119.79 3608.24 802.42 S 1267.70 E 2.86 1500.18 4200.00 59.59 120.12 3660.37 845.21 S 1341.52 E 1.39 1585.39 ~300.00 60.88 119.52 3710.02 888.37 S 1416.83 E 1.39 1672.05 00.00 61.71 119.96 3757.86 931.56 S 1493.29 E 1.55 1759.69 4500.00 61.98 121.69 3805.04 976.74 S 1568.99 E 1.55 1847.78 4600.00 63.08 121.74 3851.43 1023.77 S 1644.07 E 1.93 1936.36 4700.00 64.74 120.64 3895.41 1070.27 S 1720.90 E 1.93 2026.11 4800.00 66.41 119.58 3936.76 1115.94 S 1799.66 E 1.93 2117.04 4900.00 67.33 118.61 3975.64 1160.70 S 1880.18 E 0.90 2208.94 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 3 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C O O R D I N A T E S Deg/100Ft Sect 5000.00 66.86 117.79 4014.56 1204.23 S 1961.36 E 0.90 2300.72 5100.00 66.39 116.96 4054.24 1246.44 S 2042.88 E 0.90 2392.05 5200.00 65.88 118.21 4094.69 1288.50 S 2124.08 E 1.67 2483.04 =q00.00 65.38 119.96 4135.96 1332.77 S 2203.68 E 1.67 2573.90 00.00 64.90 121.70 4178.01 1379.27 S 2281.58 E 0.37 2664.56 5500.00 64.54 121.59 4220.72 1426.71 S 2358.56 E 0.37 2754.95 5600.00 64.18 121.48 4263.99 1473.87 S 2435.39 E 0.37 2845.07 5700.00 64.05 121.57 4307.79 1520.77 S 2512.08 E 0.96 2934.93 5800.00 64.72 122.32 4351.02 1568.48 S 2588.60 E 0.96 3025.09 5900.00 65.40 123.07 4393.18 1617.47 S 2664.90 E 0.96 3115.76 6000.00 65.86 123.60 4434.34 1667.64 S 2740.99 E 0.27 3206.90 6100.00 66.00 123.85 4475.12 1718.34 S 2816.93 E 0.27 3298.20 6200.00 66.14 124.10 4515.68 1769.42 S 2892.73 E 0.27 3389.59 6300.00 65.94 124.26 4556.18 1820.82 S 2968.35 E 0.43 3481.01 6400.00 65.52 124.37 4597.28 1872.21 S 3043.64 E 0.43 3572.15 6500.00 65.09 124.48 4639.06 1923.57 S 3118.59 E 0.43 3662.98 6600.00 65.17 124.30 4681.20 1974.83 S 3193.39 E 0.31 3753.64 6700.00 65.38 124.06 4723.03 2025.86 S 3268.54 E 0.31 3844.45 ~800.00 65.59 123.81 4764.52 2076.65 S 3344.03 E 0.31 3935.43  00 00 65.12 123.94 4806.20 2127.30 S 3419.50 E 0.51 4026.32 7000.00 64.62 124.08 4848.67 2177.94 S 3494.55 E 0.51 4116.84 7100.00 64.24 124.16 4891.91 2228.55 S 3569.18 E 0.36 4207.00 7200.00 64.53 123.91 4935.14 2279.02 S 3643.90 E 0.36 4297.16 7300.00 64.81 123.66 4977.92 2329.28 S 3719.02 E 0.36 4387.54 7400.00 65.17 123.59 5020.23 2379.38 S 3794.52 E 0.54 4478.14 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska Measured Inclin. Azimuth True Vert. R E C Depth Degrees Degrees Depth C O O 7500.00 65.67 123.84 5061.82 2429 7600.00 66.17 124.08 5102.63 2480 7700.00 66.40 124.12 5142.75 2532 ~900.00 66.40 123.98 5182.78 2583 ( 00.00 66.40 123.84 5222.82 2634 SURVEY LISTING Page 4 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 T A N G U L A R Dogleg Vert R D I N A T E S Deg/100Ft Sect .86 S 3870.17 E 0.54 4569.08 .86 S 3945.89 E 0.54 4660.36 .28 S 4021.69 E 0.13 4751.94 .60 S 4097.61 E 0.13 4843.57 .72 S 4173.66 E 0.13 4935.19 8000.00 66.24 123.98 5262.94 2685 8100.00 66.03 124.23 5303.40 2737 8200.00 65.82 124.48 5344.19 2788 8300.00 65.73 124.73 5385.23 2840 8400.00 65.66 124.98 5426.38 2892 .77 S 4249.72 E 0.31 5026.78 .04 S 4325.44 E 0.31 5118.22 .56 S 4400.82 E 0.31 5209.50 .35 S 4475.88 E 0.24 5300.66 .43 S 4550.67 E 0.24 5391.76 8500.00 65.61 125.13 5467.65 2944 8600.00 65.68 124.53 5508.89 2996 8700.00 65.75 123.92 5550.02 3048 8800.00 65.79 123.60 5591.04 3098 8900.00 65.75 123.96 5632.08 3149 .81 S 4625.20 E 0.55 5482.79 .84 S 4699.98 E 0.55 5573.85 .10 S 4775.34 E 0.55 5664.98 .66 S 4851.24 E 0.32 5756.17 .36 S 4927.04 E 0.32 5847.35 9000.00 65.72 124.31 5673.18 3200 9100.00 65.63 124.74 5714.35 3252 9200.00 65.49 125.24 5755.72 3304 9300.00 65.34 125.74 5797.32 3357 ~" 00.00 65.62 126.17 5838.93 3410 9500.00 66.09 126.57 5879.84 3464 9600.00 66.56 126.96 5919.99 3519 9700.00 66.80 126.27 5959.57 3574 9800.00 67.02 125.48 5998.78 3628 9900.00 67.25 124.68 6037.64 3681 .52 S 5002.50 E 0.32 5938.50 .14 S 5077.60 E 0.48 6029.61 .34 S 5152.19 E 0.48 6120.60 .13 S 5226.23 E 0.48 6211.45 .54 S 5299.83 E 0.59 6302.27 .65 S 5373.30 E 0.59 6393.37 .47 S 5446.66 E 0.59 6484.77 .31 S 5520.33 E 0.76 6576.42 .22 S 5594.87 E 0.76 6668.30 .17 S 5670.27 E 0.76 6760.39 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska Measured Inclin. Azimuth True Vert. Depth Degrees Degrees Depth SURVEY LISTING Page 5 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 R E C T A N G U L A R Dogleg Vert C O O R D I N A T E S Deg/100Ft Sect 10000.00 66.82 123.72 6076.54 3732.98 S 5746.44 E 1.12 6852.49 10100.00 66.21 122.71 6116.39 3783.22 S 5823.17 E 1.12 6944.21 10200.00 65.60 121.68 6157.22 3831.86 S 5900.42 E 1.12 7035.48  .n~00.00 65.26 121.25 6198.94 3879.03 S 5978.10 E 0.70 7126.31 ~0 00 65.43 122.00 6240.66 3926.69 S 6055.48 E 0.70 7217.17 10500.00 65.61 122.74 6282.09 3975.41 S 6132.35 E 0.70 7308.17 10600.00 65.84 123.23 6323.22 4025.11 S 6208.76 E 0.37 7399.32 10700.00 66.13 123.48 6363.91 4075.34 S 6285.06 E 0.37 7490.67 10800.00 66.42 123.73 6404.14 4126.01 S 6361.31 E 0.37 7582.21 10900.00 66.30 123.80 6444.15 4176.98 S 6437.48 E 0.28 7673.85 11000.00 66.02 123.80 6484.58 4227.86 S 6513.48 E 0.28 7765.31 11100.00 65.74 123.80 6525.45 4278.63 S 6589.33 E 0.28 7856.57 11200.00 65.86 123.64 6566.48 4329.27 S 6665.17 E 0.25 7947.76 11300.00 66.05 123.45 6607.22 4379.73 S 6741.28 E 0.25 8039.08 11400.00 66.24 123.26 6647.67 4430.01 S 6817.68 E 0.25 8130.54 11500.00 66.36 123.12 6687.82 4480.12 S 6894.34 E 0.31 8222.12 11600.00 66.08 123.26 6728.14 4530.21 S 6970.92 E 0.31 8313.63 11700.00 65.80 123.40 6768.91 4580.39 S 7047.21 E 0.31 8404.94 11 800 . 00 65 . 60 123 . 50 6810 . 11 4630 . 63 S 7123 . 22 E 0 . 00 8496 . 06 ~ 90 00 65.60 123.50 6851.42 4680.90 S 7199.16 E 0.00 8587.12 12000.00 65.60 123.50 6892.73 4731.16 S 7275.10 E 0.00 8678.19 12100.00 65.60 123.43 6934.04 4781.40 S 7351.06 E 0.13 8769.26 12200.00 65.60 123.29 6975.36 4831.48 S 7427.13 E 0.13 8860.32 12300.00 65.60 123.14 7016.67 4881.36 S 7503.31 E 0.13 8951.39 12400.00 65.74 123.20 7057.90 4931.17 S 7579.60 E 0.25 9042.49 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. PRUDHOE BAY DRILLING Point McIntyre (Pad #2),2-50A Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 6 Your ref : PMSS <12997-14498'> Last revised : 31-Aug-92 Measured Inclin. Azimuth True Vert. R E C T A N Depth Degrees Degrees Depth C O O R D I G U L A R Dogleg Vert N A T E S Deg/100Ft Sect 12500.00 65.95 123.34 7098.81 4981.22 S 7655.89 E 0.25 9133.74 12600.00 66.17 123.48 7139.39 5031.54 S 7732.19 E 0.25 9225.14 12700.00 65.29 122.73 7180.36 5081.46 S 7808.54 E 1.37 9316.36  00.00 64.21 121.79 7223.02 5129.74 S 7885.02 E 1.37 9406.79 30.00 63.14 120.84 7267.37 5176.32 S 7961.58 E 1.37 9496.37 13000.00 62.07 119.81 7313.39 5221.19 S 8038.19 E 2.78 9585.05 13100.00 61.08 116.86 7360.99 5262.93 S 8115.58 E 2.78 9672.68 13200.00 60.19 113.94 7410.05 5300.26 S 8194.31 E 2.18 9759.02 13300.00 59.49 111.56 7460.30 5333.70 S 8274.04 E 2.18 9844.07 13400.00 58.60 109.20 7511.62 5363.56 S 8354.49 E 2.39 9927.78 13500.00 57.17 106.94 7564.78 5389.85 S 8435.00 E 2.39 10009.58 13600.00 55.55 104.95 7620.08 5412.60 S 8515.14 E 2.31 10089.14 13700.00 53.58 103.47 7678.06 5432.61 S 8594.11 E 2.31 10166.23 13800.00 52.44 102.51 7738.51 5450.32 S 8671.77 E 0.44 10240.97 13900.00 52.12 102.14 7799.70 5467.21 S 8749.05 E 0.44 10314.93 14000.00 51.25 100.63 7861.56 5483.00 S 8826.01 E 2.08 10388.03 14100.00 50.09 98.39 7924.94 5495.80 S 8902.29 E 2.08 10458.92 14200.00 49.76 98.23 7989.45 5506.48 S 8977.94 E 0.45 10528.14  aq00.00 49.71 98.82 ,8054.09 5517.80 S 9053.40 E 0.45 10597.54 ]0.00 49.93 98.38 8118.63 5529.31 S 9128.91 E 0 53 10667 09 Ail data is in feet unless otherwise stated Coordinates are from slot #2-50 and TVDs are from wellhead. Vertical section is from wellhead on azimuth 123.09 degrees. Calculation uses the minimum curvature method. ARCO Alaska, Inc. Lisburne/Point McIntyre Engineering Date: October 19, 1992 Subject: Transmittal #198 From: ARCO Alaska Inc. To: Bob Crandall AC)GCC 3001 Porcupine Drive Anchorage, AK 99501 The following Point McIntyre P2-50a data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appreciated. Log 1 blueline, 1 sepia Collar Log (8171-8305') '"' 1 Collar Log (430-550') '" 1 Collar Log (600-950') j 1 Casing Collar Locator (String Shot Back-off) // 1 Run Run Date Company 7/31/92 Atlas 8/23/92 Atlas 8/23/92 Atlas 8/22/92 Atlas Tape/Diskette with Verification Listing MWD Survey diskette w/listing Run Date Company 8/31/92 Teleco Please sign and return to: .T~ Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 Anchorage, Alaska 99510-0360 RECEIVED OCT 2 0 1992 Alaska 011 & Gas Cons. Commj;sjon Anchorage Transmittal #198 PLEASE SIGN ONE COPY AND RETURN ARCO Alaska, Inc. Post Office Box 100360 Anchorage Alaska 99510-0360 Telephone 907 276 1215 TO: STATE of ALASKA OIL/GAS CONSER. COMM. 3001 PORCUPINE ANCHORAGE, ALASKA OPERATOR: ARCO SAMPLE TYPE: DRIES DATE: 9 SEPTEMBER, 1992 AIRBILL: AL 511967 AFT#: 2-09-09-45 CHARGE CODE: 2C0004 NAME: P2-50A ~" ~ '~ NUMBER OF BOXES: 3 SAMPLES SENT: *DRIES: 12780'-12960' 12810'-13650' 13650'-14610' * THESE ARE ALL THE DRIES FROM THE WELL, INCLUDING RE- DRILLED SECTION. SENT BY: Dan Przywojski UPON RECEIPT OF THESE SAMPLES PLEASE NOTE ANY DISCREPANCIES AND SEND A SIGNED COPY OF THIS TRANSMITTAL TO: ARCO ALASKA, INC. BAYVIEW GEOLOGIC FACILITY P. O. BOX 100360 ANCHORAGE, AK. 99510-0360 ATTN: D. L. Przywojski, ABV-10~[..... RE C E IVE D D ATE:__//_~ ~'~}-_~/~'~'"~ ARCO Alaska, Inc. is a Subsidiary of Atlantic Richfield Company ALA,...,~A OIL AND GAS CONSERVATION COMMISS,vN APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown x x Re-enter suspended well__ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __ Change approved program __ Pull tubing __ Variance__ Perforate __ Other __ 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 495'SNL, 1256' EWL, SEC. 14, T12N, R14E, UM At top of productive interval N/A At effective depth At total depth 1682'SNL, 251'EWL, SEC. 19, T12N, R15E 5. Type of Well: Development X Exploratory __ Stratigraphic__ Service 6. Datum elevation (DF or KB) KBE = 43' feet 7. Unit or Property name -P~'u'dhoe Day Un,t ~'~. ~/e_r~ z~,~, ~ 8. Well number ~'~ P2-50A 9. Permit number 92-65 10. APl number 50- 029-22261-01 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 65' Surface 4884' Intermediate Production 15299' Liner Perforation depth: measured None 15841 feet 9237 feet 12375 feet 7045 feet Size 20" 13-3/8" 9 -5/8" true vertical Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) Plugs (measured) Cement Plugs14700'-15841', 13050'-12720', 12493'- 12275' Bridge plug @ 13050'& @ 600,' Junk(measured) -/T4;.,~ !,5 ~J~. ¢ Cemented Measured depth True vertical depth 245 cu ft CS II 55' 55' 3960 cu fl CS II & 4921' 4000' 460 cu fl Class "G" 937 cuft gel G & 15336' 8799' 690 cu fl Class "G" RECEIVED & Gas Cons. Commission Anchorage' 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation 6/29/92 16. If proposal was verbally approved Name of approver M. ~Minder 6/28/92 Date approved 15. Status of well classification as: Oil Gas Suspended x Service 17. I hereby certify that~/~'hel~ the oregoing is true and correct to the best of my knowledge. i ~i Title Drilling Engineer Supervisor FOR COMMISSION USE ONLY Conditions of approval: Notify Comm~sion so representative may witness Plug integrity /~. BOP Test~ Location clearance~ Mechanical Integrity Test~ Subsequent form required 10- ! Approved by order of the Commission Form 10-403 Rev 06/15/88 Original Signed By ~;~vid W. ,Johnston IApproval No. .,C mr~issioner Date SUBMIT IN TRIPLICATE f P2-SOA OPERATION SHUTDOWN WELL SUMMARY The following requirements summarizes the procedures to shutdown operations on P2-50A, meeting requirements set forth in 20 ACC 25.072. 1. RIH w/drill pipe, set cement plug across cut section ( 12375- 12455' md) up into 9-5/8" casing. 2. RIH w/bit and dress cement off to 100 ft (12,275' md) above casing stub. Verify plug hardness with 10,000 # WOB. Have AOGCC representative witness test. 3. Displace mud with 9.8 ppg brine. POH and L/D drill pipe. 4. RIH and set bridge plug at 600' MD. Displace top 600' of well to diesel to freeze protect. Freeze protect 13-3/8" x 9-5/8" annulus. 5. ND BOPE, NU dryhole tree. 6. Release rig. The well bore has future value in a new bottom hole location can be reached from the existing well bore via redrill operations. Upon determination of a redrill target, an application for a drilling permit will be filed. RECEIVED S E P - 4 199~ Alaska Oil & Gas Cons. CornmisSi¢~ Anchorage Pru~hoe Bay Drilling Group PZ-50A Operation Shutdown 7/28/92 Dry hole tree 20" 94 ppf conductor@ 55' bridge plug @ 600' (prior to redrill) 13-3/8" 68 ppf casing @ 4921'md/4000' tvd cement plug top @ 12275' MD Section cut from 12375'- 12455' MD 8-1/2" oh to 14,600' MD \ cement plug top @ 12720' MD Section cut from 12770' - 12835' MD Bridge plug at 13050' for redrill cement plug top @ 14700' 9-5/8" 47 ppf casing @ 15336 md/8799' tvd RECEIVED S E P - 419B~: Alaska Oil & Gas Cons. Cornrnissio~ TD @ 15841' md/9237' tvd Anchorage BP EXPLORATION ARCO Alaska, Inc, August 27, 1992 Ms. Leigh Griffin, Commissioner Alaska Oil and Gas Conservation and Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Ms. Griffin, AOGCC requirement 20 AAC 25.110 (c) requires a retainer to be set between 200 and 300 feet below the casing head and cap with 100 of cement. ARCO Alaska, Inc. requests a waiver from this regulation on the Point Mc Intyre P2-50A well. A casing inspection log may be run in this well to determine the extent of casing wear. If the plug is set, the log could not be run. If the well will be suspended for more than 1 year, a cement retainer can be set at the above mentioned depth on wireline. The well is to be temporarily suspended with a plug set across the cut section (12375-13455' md). The plug will cover the cut section and extent 100 feet up into the 9-5/8" casing. This plug meets the requirements as set forth in 20 AAC 25.105 (g-l). The plug will be tested with sufficient weight to confirm its location. Very Truly Yours, Mike ~~hi ~~r~ Engineer Supervisor Alaska 0ii & Gas Cons. com~tssion ~ Anchorage Co-Operators, Prudhoe Bay Unit BP Exploration (Alaska)Inc. Post Office Box 196612 Anchorage, Alaska 99519-6612 Telephone (907) 561-5111 ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone (907) 276-1215 RECEIVED /kUG ~- 8 Alaska 0il & Gas ~ons, Commi~sion Anchorage ~o c% ~ y?z.~ ;no/¥ooo c~,~'~ ?/u,3 ~,~? IZ) zO'mO I I Pr~dhoe Bay Drilling Group PZ-SOA 7~8~2 Dry hole tree 20" 94 ppf conductor@ bridge plug @ 600' (prior to re[ir#l) 13-3/8" 6613pl casing ~) 4921'md/4000' tvd cement plug top @ 12275' MD Section cut from 12375' - 12455' MD cement plug top @ 12720' MD Section out from 12770' - 121~3S' MD 8-1/~" oh to 14,6OO' MD Bridge plug at 13050' for redrill cement plug top @ 14700' ~ 9-5/8" 47 ppf =aeir~g <~ t 53:36 md/879i)' tvd RECEIVED AUG 2 8 !992 Alaska 0il & Bas Cons. Commission Anchorage TD ~3 15841' ma/9237' tvd P2-$0A SUSPENDED WELL SUMMARY PROCEDURE The following ro. quirements Summarizes the procedures to suspend operations on P2-50A, meeting requirements set forth in 20 ACC 25.105, secUons (g), (h), and (I) and 25 ACC 25.110 secUon (c). 1. R[I-I w/drill pipe, set cement plug across cut secaon (12375- 12455' md) up into 9-5/8" ca~ing. 2. RIH w/bit and dress cement off to 100 ft ( 12,275' md) above casing stub. Verify plug harciness with 10,000 # WOB. lIave AOGCC representative witness test. 3. Displace mud with 9.8 ppg brine. POH and L/D drill pipe. 4. KIll and set bridge plug ar 600' MD. Displace top 600' of well to diesel to freeze protect. Freeze protect. 1 .~-.~/8" × 9-5/g" annulus. $, ND BOPE, NU dryhole twee. 6. Release rig. The well bore has future value in a new bottom hole location can be reached from the existing well bore via redrill operations. Upon determination of a redrill target, an application for a drilling permit will be filed. It is requested that the bridge plug at 600' be accepted as meeting requirements of 20 ACC 25.110 (c) to facilitate re-entry into the wellbore. RECEIVED A~aska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) lnc. P.O. Box 196612 Anchorage, Alaska 99519~6612 TELECOPY TO: SATELLITE UNIT Name: ............... Fax ./! FROM: NOTES: Name & .kxt.: Department: RECEIVED PAGES; TO FOLI_OW AUG 2 ~. l.~,_~z Alaska Oil & Gas Cons. Commission Anchorage (Do not include cover sheet) SECURITY CLASSIFICATION PRIVATE SECRET BATELLITE FAX MACHINE CONFIDENTIAL FAX# 907 564-5193 CONFIRM# 907 564.' '~' ' ': .~W T"I-1];HI:] dE ~;~: ~ 1; 26 .. 8Z 9FlU ..... cored intervals check off or list data as it is rcceiYed.*list received date for 407. if not * drillina history surve~ well tests core analysis ditch intervals ~--7~0 uired list as NR core dcscriDtioi ital data LOG ~.,nc,, F~. RUN ',,,'"n'c~"'"-, ~n,~o ~ SCALE ...... NO., (to the nearest foot~ linch/1 zl ,.i,,3i . . . "'~i , , '~ ,~i , ,', , ~1i I ' ........... I ...... ~ ............... I ...... 1. Type of Request: AL/,,.... ,A OIL AND GAS CONSERVATION COMMISS.... ,~1 STATE OF ALASKA APPLICATION FOR SUNDRY APPROVALS Aband~ Suspend __ Operation Shutdown ~ Re-enter suspended well __ Alter ~sing Repair well __ Plugging x Time extension __ Stimulate ~ Change approved program x Pull tubing __ Variance~ Perforate__ Other x __ Plugback ~ 2. Name of Operator 5. Type of Well: 6. ARCO Alaska, Inc. Development x Exploratory ~ 3. Address Stratigraphic__ 7, P. O. Box 196612, Anchorage, Alaska 99519-6612 Service__ 4. Location of well at surface 8. 495' SNL, At top of productive interval 1464'SNL, 285'EWL, SEC. 19, T12N, R15E, UM At effective depth At total depth 1562' SNL, 429' EWL, SEC. 19, T12N, R15E, UM Datum elevation (DF or KB) KBE = 43 feet Unit or Property name Point Mclntyre Well number P2-50A 9. Permit number 92-65 10. APl number 50- 029-22261-01 11, Field/Pool Point Mclntyre/Undefined 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 15841 feet 9237 feet 12720 feet 7188 feet Plugs (measured) Cement 14702-15841'MD Cement Retainer Cement 12720~12835'MD Junk (measured) Casing Length Structural Conductor 80' Surface 4884' Intermediate Production 15299' Liner Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) Size 20" 13-3/8" 9 -5/8" Cemented Measured depth True vertical depth 245 cu ft CS II 115' 115' 3960 cu it cs 11/46o cuft G 4921' 4000' 937 cu ft 4%/G & 690 cuft "G" 15536' 8799' RECEIVED A U 6 2 1 1992 Alaska 0ii & 6as Cons. CommiSSiOn Anchorage 13. Attachments Description summary of proposal x Detailed operations program x BOP sketch x 14. Estimated date for commencing operation 8/19/92 16. If proposal was verbally approved Name of approver M. Minder 8/18/92 Date approved 15. Status of well classification as: Oil Gas Suspended x Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge.' Title Drilling E~gineer Supervisor FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance ~ , Mechanical Integrity Test~ Subsequent form required 10~ Original Signed By Approved by order of the Commission David Wo JohRstoR Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE o . . . . PM 2-50A Permit Changes Summary Plug previous section (12770'-12835'MD) with 350 sacks cement. Dress off cement to 12720'MD. Mill new section from 12370'MD to 12430'MD. Set cement kick-off plug across milled section. The directional design reflects the change in the kick-off point. RECEIVED AUG 2 1 1992 Alaska Oil & Gas Cons. L;umm~ssiO~" Anchorage 21-L S~n~ ~HLo '~ 14:41 'p'RU'DHOE DRILLING OINT M,clNTYRE ,50 SIDETRACK ' HEIR I ZFINTAL V I EW VERTICAL VIEW SCALE 400 F't, / DIVISION REFERENCE I WELL HEAD SCALE 100 ¢~, / DIVISION ~, ~ ~o~ ~o .oo ~oo ~oo ~.~oo REFERENCE: WELL HFA. I.] ~"""i'":'"' "o~'"'t ~ .,..,,,~ 7~8~ ~ ~ ar ' f i _ . ................ ~ ~;, lr~ ...... / ~ '~ ' 7~oo ~ ~~ ~ T~GET LOGA~OH; ~ ' 7th~ ~ ~R~r, ........................... ' .... $~%- . ............ ~_ ,.N ...... , .... I w ~ ~ ~P. ~ I U4U~-- 8~00-- , . · l~ ......  :..: .................................................. ,...::::__...~ ...,~,.,~: ......... ,,,~. :~.J~, ~ :~s~ ~, ,i~ ~.~ ., l I I t I I I I I I VERTICAL SECTION PLANE: 119,94* REEEIVED AU G 2 1 1992 Alaska Oil & Gas Cons. commbSion Anchorage Smith Intemationa!, Inc. Proposal B, kSE C(~E I~lk'T $'~;7~,,3,t,. ~O.IDO lOS,(:~ 55,~ ~167.00 S7Y:,8.30 S: 99~.g6 E 1151~.0~ a 120. D6 621~q. DO 11~.04- 1~;7'~.2~ ~.OI) lO~¢e 11,32 ~1&5,81 ~!"rl.lG G ~.a5 E 1152~.~;r a 130.05 ~;2~61 It~0~,0~ O,[iO 0.1]13 O.nO 0.(1(1' 8.00 0,~ .~,.00 0.03, 0,04) 4D.O0 Smith Intemati nal Inc. Proposal 'Report C~ 0 ~ ..,mm= 65.60 12:~,20 2r9~00 9053.00 65.~ IIZ~.51:1 ZSZ.O0 ~$Z.O0 65.30 tL5.~1 2rg,ee ~,~ 66.60 tZT.~ 2rr.oo 1~.00 155.70 tP_3.10 ZlG,O0 II3~6.00 66,50 I?.3.~1 11113.0C~ 155.71, 17.3.613 11TrO.OE fi5.68 1231.56 1 ~'OS.0l.O[l 65,68 17~.50 T]E ta .,' :KELP IZ~70., I~ &.T.¥! 120,.~6 100.90 ;qll~dt:, 2~ 1~5T0.1)(I &Z.2? IIT,.,1~ 'f~.O0 "713;~,.51 1~:670.t~ &O,6g 114.~1~ la'T. ro.cO 59.17 111,54 1B8.~,?0 5T.61 1~. i9 ~,?0 START ~ FZ~L D~ 1~,~ 57.61 1~.~9 l~lr.aT l&l~.~ 55.61 1~, lS 100.00 la~.~ 53.61 ~,t7 lOO.O0 1&3~.~ 51.61 t~.16 100.00 .. 1~5~.~ 47.61 !~.1~ l~a.O0 t~.~ ~5.61 I~.IS ' lOO.eo t4~,~ 43.61 1~.t2 199.~ ~.~ 1~,~ 41.{1 m~.lO lOD.~ ~5T.05 TA~GE1 BgZ?,OC 27~.21 s Lx23&. 5t s 337&.15 S ~.21 $ 38~T.e? .s ~.67 $ 4~55.2! $ 4~73.11 $ &615,55 s C{~sdre Sir, r,r,o?,5~ E SZ1~.t3 a IZZ,~ ~!6,26 E 5&7'Z.18 a IZZ.48 51~.;Z6 E 6~93;.05 ia 122.87 5951.67 E T1~95.47 6599,t7 E ra~43 ~ 125.O0 6~LT~6~ E 3209.:!~ a:l 1Z$.82 ?"! 01).~ E 04~8.7/., a 125 .(~ rSl~,08 E $723,71 t0 apl&.16 $ 5B~5.13 $ 5108.17 S ~;56,73 E ~15.1~ ia 76);~,72 E 9185.55 I~ rrll.61 E 91~.47 B IZZ.9:) 2'6 E 9~1.67 El 1ZZ.S~J; B~.~ E 11~55.18 a IZ~.3O e1~0.56 E- ~06t5 J~t. a IZ%.10 95;]~,1~. E 1~12,63 a 9Si0.91 E 11~7.~5 ~ t2:0;.56 9STZ,T7 E llllt.Ot B tZO.ST 9608,T& E 11Z38.20 a 128-t7 9T~:.78 E 11~.70 a t210.T1 9r9~.82 E 11~,S.56:81 1~.~ 5r'~;.48 ~ 9a33.20.E lI$r6.~ ;a 120.Z1 71~.2~ 9185.5~ 717~.51 919~.46, OL~ Bui Ld galk Cd~/l(]Oft) (dsuqOOft) (darlOeft) 0.3! 0.59 O. TT 1,12 O.3T 0.$1 0.13 -o.21 8.25 -O,~? 8.Z5 O,ID7 -O,~ -0,84 0.35 0.47 0,413 -CL61 0.18 0,74 -c).:,S O. 19 -0.1~ -O,.Z8 0,14 ,:).OG -O, 14 O. ~ O, O0 -O, 27 $,00 -I ,69 -2,74 7277..~rl 936~.83 3. OQ -i ;52 :,.°o .~..o0 -o.o~' Smith lnlemationat, Inc. .,RLrv~y .4aferer~ce: &IELL~ Proposal Report Yeti[cai Section Plane:t 25.09 Deg. Oate: e~1B/9% OEr. Le~jt~ T~I) [ft) (ft) 0.00 0.01] 0,00 01.4)0 6.T~.O0 1.110 1Si.2lO ~-S1.00 817.(10 ;;.~ 121,4Q 181.00 816.Li~ ~7.00 6,50 1t6.4(I IB01.1N3 ~,.~ ~11~1.00 11].30 1;~. 1~) 11~.00 1 ITT.80 T ~:,S .iO0 1(].50 1~'Z. 10 187,iM~ 1~1 155¢.0G 1Z.;)CI 1Z&.20 1&6,10~ 15~,'~.09 17~0.00 13.~0 IZZ.80 Ig~,l~ 1T25;.35 l ~2~.OD 1~.~13 119.90 lSS,I~D ;~116,00 2Z.tG IZ2.10 188;, I~ ~0~1.75 25~.01) Z2.343 ~;~.~iO 1~.1~ ~;~.~;~ Z5.~3 122.80 1&?.ill] :~Z. S .6¢J :$01.10 123.50 I&B. Ott ~91.S7 ST.;Si) IZZ,I0 ~8?.OI] ~7301,~2 ~?.00 ~.40 IZ).lO 1~.{)0 0.001 & i},{~O E 01:59 S e,sz W T.73 $ ~.$7 E 16.27 $ ~.O~.E Z9,~ $ 47.18 E ~[1.t)7 ~: 75.62 E 68,13 $ t06.23 E 91.11 $ 141.00 E 155.~ S i~,65.20 E 5501,00 ~' 8~8.39 E 3~12J30 47.5(} IZ4,~ t~5,00 :T31)5,5~ ~793.00 5O.ICQ IZ1,4JO It~..00 342~,24 :~ea~.oo 5~.Ce IIS,~ la~.O0 3~2,74 ~170.0~ 59.20 6356.0D 61~ llg.;L~O I~.00 ~k5/-1.001 i~.10 IZZ,~ laS.(lO 3,B2:4,ZT &~65.0(I 67.501 II&,~O 5119.0D 66.11) 5599.001 6~.gO I21.710 ~ 9~0 .ar~ E ~ 105T,S~ E B'~Z,22 ~ t319.20 E 912,45 S 1{59.61 E 9a5,~ G t599.69 E 3W~2.2~ 11&$, 16 ~ .ia51,~5 E s Z'0.~.4.0 E s Z,?.~.81 E 567'8.QD ~r:G.g0, 121.40 Z~.00 &Zg~.1~ 15T0.45 S ZZ~5.22 E 6239.03 ,r~5.~) 1Z~.20 ~i.100 &531 ,~ I7'~.~5 S 2922.25 E 7~7.1:X3 e6.aO lZ~,.2~O Za2.00 ~;121.5;T .~505.01 S ':~I.51 E 'F;28.00 66.~ 1~.80 2~1.00 SiZ.~..(l~ Lax~.O0 S ~,19~.~'8; E 0,013 Z, 1.3 Z,O? 9,91 1.13 0,81 -0.75 1..-% 1 ~t7 t.17 ~.~0 Z .$~ ~3 .Si' -0 1.301 - 1.29 ~1.2~ ' 0.5~ e.g7 1.3¢ -I 2.15 -I .~ Z.~ I 0.23' l.&? -O.5e q.75 D. 3T -0,.~ -0.11 O.~ O.(d~ 0.75 D. ZT 0. i~ 0,25 B.&) -0.~2 O, 11 O.$1 0,2! O. 36 O, Z9 -~.25 D,~5 0;50 9.25 0.13 '0.64) -~1.14 SU~',.,"ACF_. 3LE DIVERTER SYSTEM .::.:'." Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential'"'" source of lgnilion. 10" Full Opening Valves '35' or as required Bresser Sleeve .o 10' Oiveder Uno 1. All pipe connections 150fi ANSI Flanges or welded connectbns and secured to prevent movemenL 2. Manual 10" full opening valves mechanically connected to ensure that one valve is fail-sale open at all times. 3. All lures are go deg. and targeted. 10' Full opening ball valve w/Hydraulic R [~ (~ E IV E D Actuator AUG 2'1 1992 Celiar Alaska Oil & Gas Cons. 6ommissi~n .&nchorage 20' Diverter Spool w/10' Side Outlet MEM 1~F20 BOP STACK CONFIGURATION ATTACHMENT II 13 5/8", 5000 PSI WP TRIPLE RAM STACK WORKO VER I I RISER ANNULAR PREVENTER 2" KILL LINE MANUAL GATE PIPE RAMS I PI PE RAMS HYDRAULIC GATE DRILLING 5POOL BLIND RAMS i I I 4" CHOKE LINE HYDRAULI C 'MANUAL GATE GATE WALTER J. HICKEL, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 June 30, 1992 Michael Zanghi Drilling Engineer Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Pt. McIntyre P2-50A ARCO Alaska, Inc. Permit No: 92-65 Sur. Loc. 495'FNL, 1256'FWL, Sec.' 14, T12N, R14E, UM. Btmhole Loc. 1021'FNL, 776'FWL, Sec. 19, T12N, R15E, UM Dear Mr. Zanghi: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill I;'illb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenFII Service [] Development Gas [] SingleZone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO A/aska, Inc. KBE-- 46feet Point Mclntyre 3. Address 6. Property Designation P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 34627 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) 495' FNL, 1256' FWL, SEC. 14, T12N, R14E, UM Point Mclntyre At top of productive interval 8. Well number Number 941°FNL, 526'FWL, SEC. 19, T12N, R15E, UM P2-50A U-630610 At total depth 9. Approximate spud date Amount 1021' FNL, 776' FWL, SEC. 19, T12N, R15E, UM 6/24/92 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 28276/526 feet Pt. Mc. #10 @ 200'/120 feet 2560 16021'MD/9377'TVD~eet 16. To be completed for deviated wells 17. Anticipated pressure (s~ 20 AAC 25.035 (e)(2)) Kickoff depth ~269~feet Maximum hole angle 6~.2 o Maximum sudace 3575psig At total depth (TVD) 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 29# CR-13 Fox 3626' 12395' 7057' 16021' 9376' ! 565 cu ft "G" RECEIVED J U N ? 4 1992 19. To be completed for Redrill, Re-entry, and Deepen Operations. Alaska Oil & Gas Cu.~. Present well condition summary ;Anchorage Total depth: measured 15841 feet Plugs (measured) Cement 14702'-15841' true vertical 9237feet Cement Retainer@ 13000' Effective depth: measured 13000feet Junk (measured) true vertical 7301 feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor 65' 20" 245 cuft CS II 55' 55' Surface 4884' 13-3/8" 3960 cu fl CS I1+ 4921' 4000' Intermediate 460 cu ft "G" Production 15299' 9-5/8" 937cu ft 4% gel/G 15336' 8799' Liner + 690 cu ft "G" Perforation depth: measured true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch ~ Drilling program IT1 Drilling fluid pro~lram E-I Time vs depth plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirementsl-I /~1 hereby certify thzat the fore, going is true and correct to the best of my knowledge Signed ~/(', ~ ' ~. ~(/ Title Drilling Engineer Supervisor Date((~' :? Commission Use Only Permit Number_ '~PI number . lApp, reval date ISee cover letter ¢'.2,- ~'..,.z' 15o-,~.z.?- 2. z~C/-~/ I ~ ~",~-~ "¢¢')--If°r other requirements Conditions of approval Samples reql~ired [] Yes ,~No Mud log req'uir,.e-- d [] Yes ~]~'No Hydrogen sulfide measures [] Yes ~ No Directional survey required ~ir Yes [] No Required working pressure for BOPE []2M; 1-13M; J~5M; E]1OM; E]15M; Other: Original Signed By by order of Approved by David W. Johnstorl Commissioner [ne commission Date Form 10-401 Rev. 12-1-85 Submit in triplicate · o ,, o . J 8~ . 10. 11. 12, O_Derations Summary · RIH with a bridge plug for the 9-5/8" intermediate casing and set at 13000' md. Viscosify brine to build milling fluid· Pick up section mill· Run in the hole to PBTD. Sp°t a 17 ppg balanced mud pill from PBTD to the base of proposed section. Pull up to the prOposed section starting depth and mill a 60' section. Run in with open'ended 5" drillpipe. Spot a balanced cement plug across section. Perform hesitation squeeze. Hold squeeze pressure on cement for 1 hour and then POH. PU drilling assembly. RIH and dress off cement plug to the kick off point, 5' below the top of the section. Displace well to oil base core fluid, Orient and kick off from 5' below the top of the section. Directionally drill to core point as per directional plan. Condition mud for coring· PU coring assembly and core as per on-site directions. PU drilling assembly to ream cored section and TD hole. Run E-Line logs. Set and cement 7" liner. PU 6" BHA and clean out to PBTD. Test liner to 3000 psi. Displace well to 9.8 ppg brine, Recover core fluid. Run Gyro. Freezed protect well with 600' diesel cap. NU dry hole tree and test to 3000 psi. Release rig. Run tubing string at later date with workover rig. RECEIVED JUN 2 4 1992 Alaska Oil & Gas Cons. OommissiO~ Anchorage P2-50a MUD PROGRAM MILLING FLUID PROPERTIES Weiaht Marsh Vis Yield Pt. 10 sec gel 10 min ael ~ APl F.L. 9.8-10.2 60-80 50+ 20+ 20+ 8.5 8-12 cc PRODUCTION HOLE DRILLING/CORING FLUID Once milling operations are completed and the cement plug set and dressed off, the well will be displaced to the core fluid and drilling continued. Upon reaching core point, the fluid will be conditioned to maintain equity core fluid properties (water content) as stated below. FORMULATION (_Der bbl) LVT 200 Clavtone EM Lime Versamod Stabilhole Lowate 0.749 bbl 6-8 # 3.0# 2.0# 30.0# 142.3# CORING FLUID PROPERTIES Weight PV YP 10 sec Gel 10 min Gel HT_HP_E,~ E.S. 9.8-10.2 15-20 7-12 5-9 1 5-20 _<2cc 2000 % water <g RECEIVED Alaska, Oil & Gas Coils. Anchorage .J ! PRUDHOE BAY · · /"" . / ; ./,,..x,._,,,.. ?/ II ~ I PM-2 .I I LOCATED ~THIN PROTRACllED SECTION 14. T12N. R14E, UMIA! UERIDIAN, ALASKA · r · , WELL A.S.P. Pk ANT OEOO[ tic GRO~)ND l OCAIION NO. C~OS, C~DS. POSlllON ELLV, IN SFCIION S. ggB.101.10 N/A 70'24'~.082" 7,~ 481' FNL 49 681,~g.85 t4B'31'2t.543' 12E~' F~. - 5,~B,~7.04 N/A 70'23'59.945' B.6 495' FNL 50 ~1,504.S! 148'51'21.710' 1256' ,.~ ,, .... 5,998,073.09 N/A 70'23'S9.BD9' g.0 509' FNL '51 681,49g.32 14B'31'21.877' 1250' I'~ ~ . .. i~'"- VICINITY, MAP · ' - N,T.S. 5UR~Y0~'$ C~RTIF,!PA~E ! HERRen' ~FY ~A~ I AM PRO- TO ~AC~ LAND ~R~YIHO T~ 5TA~ ~ A~A AND MA~ By ~ ~ ~R MY DIRECT ~1~$ AN0 OTHER ~IAIL$ ~EC1 AS ~ APRIL ~5. 1~2, LEGEN..D .._ ~ DOSTIHC, ~LLS, · CONDUCTOR A$-~UILT THIS SURV£Y. NOTE?_, 1. COORDINATES SNOWN ARE ALASKA STATE PLANt ZONE 4, NAD 27. 2. DA~I~ OF LO~A'I'IO~¢ PER biOK~dklEHT~ CCP 'C' AND LI NORTH/LI S~TH (aRAUN). 3. REFERENCE FIELD B~K: P~ 92-1t(pg~.03-07) 4. DATE ~ ~R~Y: APRIL 25, 1992 5. ASP ~ID ~AL[ FACTOR - 0,~999574 F. ROBERT BELL & ASSOC. ARCO Alaska., Inc. PT.. McINTYRE PM-2 CONDUCTOR AS-BUILT · WELLS ~ 4-9,50,51 ii -- · - '1 -- ' 0 f I ACCUMULATOR CAPACITY TEST 1. CI-IECK AND FILL ACCUMULATOR RESERVIOR TO TtlE PROPER LEVEL WIll l HYDRAULIC FLUID. 2. ASSURE THAT THE ACCUMULA'I'OFI PRESSURE IS 3000 PSI WITI-I 1500 PS! DOWNSTREAM OF II-IE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALl_ UNITS SIMULTANEOUSLY Al,ID RECORD TtlE TIME Al,ID PRESSURE REMAINING AF'fER ALL uNrrs ARE CLOSED wrrH 'IRE CHARGING PUMP OFF. ,t. RECORD ON Tt IE IADC REPORT. TI-tE ACCEPTABLE LOWER LIMI'¥ IS ,45 SECONDS CLOSING -lIME AND 1200 PSI [~IEMAINING PRES- SURE. PIPE RAMS ~ 2. 4. · ' ~LJ SPOOL ~ ~ 7~ 8. SPOOL i . . 12. 1:3. 14. 15. 16. 17. 13-5/8" STACK 1EST FILL BOP STACK AND MANIFOLD WITH A NON-FREEZING FLUID. CtlECK THAT ALL HOLD DOWN SCREWS ARE FULLY REFRACTED. MARt( 11-1E RUNNING JOIN1- WI 111 PREDETERMINED PLUG SEATING DEPTI-I. RUN 'IHE 1'EST PLUG O1',: DRILL PIPE AND SEAT IN WELL- ! lEAD. CLOSE ANNULAR PREVENTER AND UPSTREAM VALVES. FUNCTION TEST CHOKES. IN EACI-I TEST, FIRST I-IOLD 250 PSI FOR 3 MINUTES PIIlOR TO TI.tE I IIGI-I PPRERSSURE TEST. INCREASE PRESSURE ON ANNULAR 1'O 3000 PSI Al,ID I IOLD FOR ,3 MINUTES. BLEED PRESSURE '! O ZERO. OPEN ANNULAR PREVENTER AHD CLOSE TOP PIPE RAMS. INCREASE PRESSURE TO .5000 PSI AND HOLD FOR 3 MINUIES. BLEED PRESSURE TO ZERO. CLOSE VALVES DIREC'I'LY UPSTREAM OF TI IE CI-IOKES AHD OPEN CHOKES. IIqCREASE PHESSURE TO 5000 PSI AND I.IOLD FOR 3 MINUTES. BLEED PRESSURE TO ZERO. OPEN TOP SET OF PIPE RAMS. CLOSE BO] I'OM PIPE RAMS. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR 3 MINUI'ES. BLEED PRESSURE TO ZERO. TEST REMAINING MANIFOLD VALVES (IF ANY) WITI-I 5000 PSI UPSTREAM .OF TI-IE VALVE AND ZERO PRESSURE IDOWNSTREAM. BLEED PRESSURE TO ZERO. OPEN BOTTOM PIPE RAMS. BACK OFF RUNNING JOINT AND POH. CLOSE BLIND RAMS AND TEST TO 5000 PSI FOR 3 MINU1-ES. BLEED OFF ALI_ PRESSURE. OPENFJl. IND RAMS. FII.LMANIFOLD AND LINES Wll'I-! NON-FREEZIHG I--LUID. SET ALL VALVES IN 'HIE DRILLING POSITION. TEST STANDPIPE VALVES TO 5000 PSI. CHECK DEGASSER OPERATIOH. RECORD BOP TEST INFORMAl IOI,I OIq 'H-IE BOP TESI' FORM SIGH AND SEND TO DRILLING SUPERVISOR. PERFORM COMPLETE BOP TEST WEEKLY AND FUNCTION TEST DAILY. i SUCT~O~I (J p_8~ ~T~OM Jl 8~L 1'* "ti. ., ,,,,- L_._~.,- ~,,~ $0 ~L TA, IJ t J L, iD. l~8t. 50 ~llSL rite ,,o.~ 1. 1 - 200 gpm Operating Capacity. Centrifuge 15 - Brandt 1-~5 Hud 14Ix AgJ. tators 1- 150 bbl. Trip Tapk 1- Paoording drilling fluid, pit level indicator with both visual and audio warning devices at driller's console' 1.-Dr{'lling fluid fig.-] s~_nsor with readout aL= drill%~.',s console BOP STACK CONFIGURATION 13 5/8", 5000 PS1 WP TRIPLE RAM STACK ATTACHMENT I! WORKO VER RISER ANNULAR PREVENTER 2" KILL LINE PI PE RAMS i PI PE RAMS I MANUAL HYDRAULIC GATE GATE DRILLING SPOOL 1 BLIND RAMS I 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE ,RECEi JUN 2 4- ED ITEM (1) Fee (2) Loc ., CHECK LIST FOR NEW WELL PERMITS ** (3) A_dmi n .~ ru~ [10 & 13] APPROVE DATE E2-~hru8'] ~ 3. 4. 5. 6. 7. 8. [14 thru 22] (5) BOPE ,~.~.~.~-~- ~_~ [23 thru 28] ?/ (6) Other ~/~ · [29 thrb 3]~] (7) Contact (8) Addl , e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Company ...... Is permit fee attached ............................................... Is well to be located in a defined pool .............................. Is well located proper distance from property 1 ine ................... ~ Is well located proper distance from other wells ..................... ~-~. .... Is sufficient undedicated acreage available in this pool ............. ~ ....... Is well to be deviated & is we!lbore plat included ................... ~ . , Is operator the only affected party .................................. ~_ . . can permit be approved before 15-day wait ............................ /~. Does operator have a bond in force ................................... ~ Is a conservation order needed ....................................... . ..... ~__ Is administrative approval needed .................................... Is lease nt~nber appropriate .......................................... L Does wel 1 have a unique n~ne & n~nber ................................ . .. Is conductor string provided ......................................... 'Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ _ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... ~ Will all casing give adequate safety in collapse, tension, and burst. .~ Is well to be kicked off from an existing wellbore ................... ~ Is old wellbore abandonment procedure included on 10-403 ............. ~f Is adequate wel l bore separation proposed ............................. ~ Is a diverter system required ........................................ ~ Is drilling fluid program schematic & list of equipment adequate ..... ~ , .... Are necessary diagrams & descr i pt ions of 4S:~;.~;-:~: ~ BOPE attached .... ~ Does BOPE have sufficient pressure rating -- test to .~o ps ig ..... ,~,¢ .... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... ... ~ FOR EXPLORATORY & STRATIGRAPHIC WELLS' Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone number of contact to supply weekly progress data ...... Lease & Well YES t ,/ g -t -rz 33. Additional requirements ............................................. geology' engineering:, DWJ~ MTM~ LCsf~0 RP~_~ BEW/' RAD~'~.-~.~ rev 04/92 joi6.011 .... INITIAL GEO'L UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE ...... Additional remarks'