HomeMy WebLinkAbout193-124mLUGGIN~ = LOCATION ~L ·
-. ~ ~--EAk~-NCE R~PORT
State of Alaska
ALASKA 0iL & GAS C~SERVATION CCM~ISSION
o~9- ~ ~ 7 ~~ -~ /
.:err ~--n-:e?~ais - to.us:
Review the well file, ~,~-cerumen= on plugging, well head
Well hea~ =a= o~f: )--
Harker 'pos= or pla=s:
Loca<ion Clear=ce:
Signed
Date
· ~-~'-- STATE OF ALASKA ......
ALASK )ILAND GAS CONSERVATION COb,_ 3SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for CTD Sidetrack
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. ~~ 193-124 300-238
3. Address t-- "~- ~. 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 ~ -~'~ 50-029-21763-01
4. Location of well at surface ' './': / i': :::-:':~'*~~! 9. Unit or Lease Name
1820' SNL, 501' WEL, SEC. 06, T11N, R14E, UM , ". 4 '. ..... Prudhoe Bay Unit
At top of productive interval ; .r_i ~_~ (Z~ :.,:;;~.¢. '
1577' SNL, 661' EWL, SEC. 08, T11N, R14E, UM
At total depth ~ "-:~:~ >' ' 10. Well Number
! .~'b ._ ! E-23A
3212' SNL, 1161' EWL, SEC. 08, T11N, R14E, UM j ::: :;' :i... 7 .....
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 67.95 ADb 028304
12. Date Spudded10/15/1993 113' Date T'D' Reached I14' Date cOmp'' Susp'' Or Aband'l 1/04/1993 9/26/2000 I15' water depth' if °ffshOreN/A MSL II 16' N°' °f C°mpleti°nSzer°
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where SSSV setI 21. Thickness of Permafrost
12300 8900 FTI, 12300 8900 FTI, [] Yes [] NoI N/A MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD
23. CASING, LINER AND CEMENTING RECORD
CASING SE-FrING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" Conductor Surface 110' 8 cu )/ds Concrete
13-3/8" 72# L-80 / S-95 40' 2793' 17-1/2" 1951 cuft PF 'E', 1951 cu ft Permafrost
9-5/8" 47# L-80 36' 8467' 12-1/4" 2315 cu ft Class 'G'
7-5/8" 29.7# N'-80 STL 2983' 4405' 9-5/8" Uncemented Casing Patch
7" 26# L-80 8316' 11321' 8-1/2" 395 cu ft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number)
SIZE DEPTH SET (MD) PACKER SET (MD)
None 3-1/2", 9.2#, L-80 10966' 10920'
MD '1-VD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
11115' Set IBP
11085' 1st P&A with 7 Bbls Class 'G'
11049' 2nd P&A with 5 Bbls Class 'G'
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBb CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-BBb OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
R > :'
L,~,¢ .-=~; ¥ ~.~.~
0 200!
Alaska Oil & Gas Cons. Cornrnissiof~
Form 10-407 Rev. 07-01-80
Anchoraoe
Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
Sag River 10258' 8315'
Shublik 10299' 8355'
Sadlerochit 10373' 8425'
31. List of Attachments: Summary of Daily Drilling Reports
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieHubble ~,r/~ ~ Title TechnicalAssistant Date
E-23A 193-124 300-238
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
~NSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM ,5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'. ~,~: ..'. .- '- r ........
Form 10-407 Rev. 07-01-80
A 3Sk.-q. (ii! .,¢°.: 07]~ r:¢,,m.
Well: E-23B Accept: 11/20/00
Field: Prudhoe Bay Spud: 11/30/00
APl' 50-029-21763-02 Release: 12/12/00
Permit: 200-142 CTD Unit: Nabors CDR1
PRE-RIG WORK
09/25/00
·
Run in hole with 2.50" Baker IBP. Set at 11,115' to cover perforations in 7" liner. Tied-in to nipples in
tailpipe and corrected depth to ELMD. Verified set with weight. Pressure test to 500 psig. Pull out of
hole.
09/26/00
Run in hole with 2.25" cementing nozzle. Tag IBP and correct depth. Pump 6.5 bbls - 17 ppg, Class G
cement. Lay cement from 11,111' to tubing tail. Pump 20 bbls contaminate. Contaminate down to
10,960' (TOC)~ Circulate hole at 1 bpm while pulling out of hole at 65%. Freeze protect to 2100' with
methanol. SIWHP - 130 psig. Secure well. Rig down.
09~27~00
Tag cement plug at 10,946' sim and test tubing to 2200 psi. Good test.
10/03/00 - 10/04/00
Mill SSSVN from 2184' to 2188'. Mill SWS at 10,932' ctmd, mill SWS nipple at 10,962' ctmd. Mill SWN
nipple at 10,973' ctmd. Tag TOC at 10,993'. Mill cement to 11,000' ctmd and sweep gel around. Pull
out of hole and drop 5/8" ball to open c-sub. Left well freeze protected to 2,500', with 60-40 methanol
water.
10/28/00
Tag TOC at 10,962' corrected. Log for tie-in. Pull out of hole, freeze protect CT and well. Suspend
operations.
COIL TUBING DRILLING
11/21/00
Complete spotting modules. NU BOPE. Accept rig at 2100 hours on 11/20/00. Test BOPE. Witness
waived by J. Jones with AOGCC.
11/22/00
Continue to test BOPE. Change two valves on BOP stack. Test same. Change out stripper element in
hydril. RU to pull test weld on connector to 20K#. RU DSM lubricator. Pull BPV. Monitor well for 15
minutes. Displace coil to KCL water. MU pilot hole assembly. Surface test orienter. Run in hole.
Shallow test MWD. Continue to RIH to flag (-12 correction). Log tie-in. Correct-9'. Tag cement at
11,000'. Orient. Drill cement f/11,000' to 11,080'. Cement very soft. Pump bio sweep. Pull out of hole
for underreamer.
11/23/00
LD BHA #1 (pilot assembly). MU Weatherford underreamer, RIH. Underream cement from 10990' to
11085'. Difficult getting started.
11/24/00
Underream pilot hole cement to 11080'. Pump bio sweep. RIH. Spot and RU Dowell cementers. Mix
and pump cement from 11070'. Estimated TOC at 10870'. Wait on cement to settle. Wash cement to
10940' (inside tubing tail). POH. Circ out excess cement. Wait on cement.
FEB 0 2 70'01
Alaska Oil & Gas Ct,ns. Cornr~fissiol;
h, nchnra,ne
E-23B, Coil Tubing Drilling
Page 2
1/25/00
Wait on cement plug. MU BHA #4, RIH. Mill pilot hole and ramp to 11049', encounter casing. Pull out
of hole. MU window milling assembly, RIH.
11/26/00
Mill window, pull out of hole. MU crayola mill BHA, RIH.
11/27/00
Dress window to 11060'. MU drilling BHA, RIH.
11/28/00
Drill to 11097'.
11/29/00
Log GR. Back ream to 11045'. Ream to 11093'.
11/30/00
Perform weekly BOP test. Test witness waived by AOGCC's John Spaulding. All valves passed. MU
BHA #10, RIH. Drill ahead to 11144'.
12/01/00
Drill to 11557'.
12/02/00
Drill to 11995'.
1 2/03/00
Drill to 12227'.
12/04/00
Drill to TD at 12706'.
12/05/00
Ream and backream hole. Wait on weather.
12/06/00
Wait on weather.
12/07/00
Continue to wait on weather.
12/08/00
POOH laying new FIo Pro in open hole. Prep to run 2-3/8" liner. Run in hole with liner, work to bottom.
12/09/00
Circulate hole, prepare for cement job. Batch mix 21 bbls of 15.8 ppg cement. Cement to weight.
Pressure test lines and pump 5 bbls KCL/water followed by 16 bbls cement, displace w 41.5 bbls
KCL/water and pull out of 'o' ring sub/flapper valve assembly. Lay in remaining cement inliner and
cleanout with 35 bbls biozan. Good indication of cement back from TOL and BOL. Cement in place.
POOH, circulating. Jet stack. Perform weekly BOPE test, while waiting on cement. Witnessing waived
by AOGCC rep. Jeff Jones.
1 2/10/00
Log down from 10800' to PBTD and back up. POOH with logging assembly.
Alaska Oit & Gas Co~;s. Comrnissior~
A:chorage
E-23B, Coil Tubing Drilling
Page 3
12/11/00
Identify perf intervals. PU perf guns and RIH. Perforate with 1-11/16" guns, 4 spf at 3100 psi. Perf
intervals: 12000' - 12075', 12170' - 12340', 12380' - 12488', 12568' - 12662'. POOH and monitor.
Hole stable.
1 2/1 2/00
RIH with nozzle and freeze protect well with 60/40 methanol/water. POOH. Set BPV, clean pits. Blow
down lines and N/D BOPE. Rig released.
FEB 0 2001
Alaska (')il & Gas Cc, ns. Con:aissisn
,,\nc hora -l,q
._
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
JANUARY 03,2001
P~L
M
A T
E
IAL
T H
IS M AR
U
W
N D
K E R
E R
C:LO~M.DOC
.----. STATE OF ALASKA ~'-
ALASK JIL AND GAS CONSERVATION COM .... $SION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1820' SNL, 501' WEL, SEC. 06, T11N, R14E, UM
At top of productive interval
1577' SNL, 661' EWL, SEC. 08, T11N, R14E, UM
At effective depth
3212' SNL, 1161' EWL, SEC. 08, TllN, R14E, UM
At total depth
3212' SNL, 1161' EWL, SEC. 08, T11N, R14E, UM
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
ORIGINAL
6. Datum Elevation (DF or KB)
KBE = 67.95
7. Unit or Properly Name
Prudhoe Bay Unit
8. Well Number
E-23A
9. Permit Number
193-124
10. APl Number
50- 029-21763-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Liner
9-5/8" Casing Patch
Perforation depth: measured
12300 feet
8900 feet
12300 feet
8900 feet
Length
Size
110' 20"
2753' 13-3/8"
8431' 9-5/8"
Plugs (measured)
Junk(measured)
Cemented MD TVD
8 cu yds Concrete 110' 110'
1951 cuff PF'E',1951 cu fl PF 2793' 2650'
2315 cuff Class'G' 8467' 6636'
3005' 7" 395 cu fi Class 'G' 8316' - 11321' 6529' - 8904'
1094' 4-1/2" Uncemented Slotted Liner 11206' - 12300' 8898' - 8900'
1422' 7-5/8" Uncemented Casing Patch 2983' - 4405' 2786' - 3736'
Slotted Liner: 11327'-12276'
RECEIVED
true vertical Slotted Liner: 8904'-8900' S£P 1,5 ,2000
Tubing (size, grade, and measured depth) 3-1/2", 9.2#, L-80 to 10966' AJa~ 0~J & Ga8 CoF~s. Cg~J~lj0fl
Packers and SSSV (type and measured depth) Otis 'XDB' SSSV Landing Nipple at 2203'; 9-5/8" x 7-5/8" Baker scab liner top packer at
2983' & lower scab liner packer at 4404'; 7" Baker 'FB-I' packer at 10920'
13. Attachments
[] Description Summary of Proposal
14. Estimated date for commencing operation
September 17, 2000
16. If proposal was verbally approved
Name of approver
Date Approved
Contact Engineer Name/Number: Thomas McCarty, 564-5697
15.
[] Detailed Operations Program [] BOP Sketch
Status of well classifications as:
[]Oil []Gas []Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby certify th~Lb.a~he foregoing is true and correct to the best of my knowledge
Signed "~--~'~'. ,-.--,,..,,- ,,,¢--¢' r-/,~,,~.~ Title CT Drilling Engineer Date
Thomas McCady
Conditions of Approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test _// Location clearance __
Mechanical Integrity Test Subseque. n.t form required 10-. 1.(. O .~.
of the Commission ORIGINAL SIGNED ~Y ,,~ec~ CoPY
Approved by order D Taylor Seamount ~'00rr~'~ ,,,.d~rn_e..6 ~- Commissioner
Form 10-403 Rev. 06/15/88
IApproval No. ~ . ~
Date /~//'~/(~
Submit I~{ Trip;Ii(Cate
bp
September 12, 2000
To:
Attention:
Subject:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Blair Wondzell
Sr. Petroleum Engineer
E-23b CTD Sidetrack Prep
BP Exploration Alaska Inc.
Drilling & Wells
Coiled Tubing Drilling Team
Well E-23a is scheduled for a through tubing sidetrack to be drilled with coiled
tubing. The following summarizes the procedure required to prep E-23a for
drilling and is submitted as an attachment to Form 10-403. A schematic diagram
of this proposed completion is attached.
]. A Tubing Integrity Test on 7/16/00 was successful.
2. The well was drifted to10989'md with slickline on 8/29/00.
3. A MITIA was successful on 8/31/00.
4. A inflatable bridge plug (IBP) will be set at approx. 11,190'md (8828'tvdss)
with service coil.
5. Using service coil the existing slotted liner and perforations will be abandoned
by laying in approximately 9bbls (7" liner vol.) of cement above the IBP.
6. The window will be milled off of the cement plug with service coil out of the 7"
liner with the KOP at approximately 11,050'md (8812'tvdss)
7. A sidetrack of approx. 1300 ft into Zone 1 b will be drilled with CT.
8. The sidetrack will be completed with a cemented 2 3/8" liner that will be
brought up into the existing tubing tail and cemented in place. The cement
top will be approximately 10,960'md (8,784'tvdss).
Service coil is expected to perform steps 4, 5 and 6 beginning on September 17,
2000. Drilling coil is expected to begin the sidetrack drilling on September 22,
2000.
Thomas McCarty
CT Drilling Engineer
Tel: 564-5697
Fax: 564-5193
Cell: 240-8065
rnccarttm@bp.com
www. bp. corn
CC:
Well File
Petrotechnical Data Center
Terrie Hubble
RECEIVED
SEP 15 2000
Aias~ ~l & Gas Cons. rj0mmission
TREE: 3-1/8" - 5M
WELLHEAD: 13 5/8"
5M McEVOY
ACTUATOR: Baker
-23b Prl
13 3/8", 72#/ft,
2793'
L-80, BTRS
FOC
KOP: 600'
MAX ANGLE: 93.2°@11779'
3 1/2" 9.2 #, L-80 NSCT
2.992" ID
0.0087 BBLS/FT
7" LINER TOP PKR I 8316, I
W/LINER HANGER
9 5/8", 47#/ft, I 8467' !~
L-80, BTRS
PERFORATION SUMMARY
REF LOG: Sperry-Sun MWD (10-28-93)
SIZE SPF INTERVAL :)P / SQZ
~_-1/8"4 11130'-11170' OP
I-TOC !
TOP OF SLO~-I'ED LINER
7",26#, NSCC, L-80
IInflatable bridge plug ~
set at -11190'md
I11206'
I11321'
HORIZONTAL SECTION
4.5" SLOTTED LINER
(11327'-12276~
4.5" SLOTTED LINER 12300'
~ed Com
~tior,
KB. ELEV = 68.05'
BF. ELEV = 31.85'
OTIS "XDB" 2.75 ID
3 1/2 SSSV LANDING
NIPPLE
I 2203' I
GAS LIFT MANDRELS
CAMCO 3 1/2 X 1 1/2 MMG X
WITH "RK" LATCHES
N° MD(BKB) TVDss DEV
2 5139 4268 43
I 8227 6568 45
CSG PATCH- 2983'-4405'
7 5/8" 29.7 # N-80 STL CSG
BAKER PACKERS
TOP PKR- MOD CPH
BTTM PKR- MOD 3D
3.5" SWS NIPPLE
(2.75" ID)(PARKER)
10917'
7" BAKER PACKER
(FB-1)( 4.000 ID)
WITH 14.43' SEAL BORE
3.5" SWS NIPPLE
(2.75" ID)(PARKER)
3.5" SWN NIPPLE
(2.75" ID)(2.625" NOGO)
3 1/2" WLEG
ELMD [
10966'
10960.5'
AT 11206' MD
2 3/8" liner cemented to
approx.10960'md
7" X 4" TIW SS PACKER SCOOP
RECEIVE
SEP 1 $ 2000
Ala~ 0~; & Gas Cor~s. Corem
TREE: 3-1/8'-5M ..IL"-_~23a KB. ELEV= 68.05'
WELLHEAD: 13 5/8' 5M McEVOY ' BF. ELEV = 31.85'
ACTUATOR ' Baker --1 FI'~' 'OTIS'XDB' 2.751D
~ 3 1/2 SSSV LANDING I .... ,
I
NIPPLE I zzu I
13 3/8', 72#/ft,
L-80, BTRS ~ F(:~/~ J ~A~) LII- I MARUHI-L~
J CAMCO 3 1/2 X 1 1/2 MMG X
/ . WITH 'RK' LATCHES
i~.XANGLE:93.2el1779., !1 L 2 i 5139 4268 4312.992.3,/2.9.2,D #'~°NscT ' --!t'i ]1 i 8227 i6568 45 I
.0087 BBLS/FT
~! CSG PATCH- 2983' - 4405'
| 7 5/8" 29.7 # N-80 STL CSG
/ BAKER PACKERS
| TOP PKR- MOD CPH
BTTM PKR- MOD 3D
7' ENER TOP PKR ' i 8316' I
~ ! 3.5' SWS NIPPLE I
95/8',47#/ft, ] ~'~"/' [ '~ il, (2.75'ID)(PARKER) [ 10917' I
L-80, BTRS I "-~- I
7' BAKER PACKER I I
(FB-1)( 4.000 ID) 10920'
WITH 14.43' SEAL BORE
3.5' SWS NIPPLE
(2.75' ID)(PARKER) [ 10942'
3.5' SWN NIPPLE
(2.75' 1D)(2.625' NOGO) I 10954'
TOP OF SLO'i-rED 3 1/2' WLEG [ 10966'
UNER ] 11206'!
X 4" TIW SS PACKER
SCOOP
PERFORATION ~UMMARY AT 11206' MD
REF LOG: Speny-Sun MWD (10-28-93) HORIZONTAL SECTION
SIZE SPF I_I__N~E_~RV__AL:. ~)P_/_SQZ 4.5" SLOTTED LINER
~-i~- ,~ ,,~-,,,,u u~ (11327'-12276')
LINER
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
12-7-87 INITIAL COMPLETION WELL: E-23a {'13-8-11-14)
11-7-93 M.MNDER SIDETRACK COMP. DOYON 9 APl NO: 50-029-21763
,SEC 6;T 11N; RG 14E
12-24-93 DGH SIDETRACK COMP. DOYON 14
08-17-98 RAC C'IU ADD-PERFS BP Exploration (Alaska)
SIZE SPF INTERVAL )P / SQZ
~-i/~- ,i i i,~,'-i i i~o' OP
SEP 15 2.000
,%
,Na ka & Gas Cons.
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 9850
Company:
Alaska Oil & Gas Cons Comm
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
10/27/95
Field:
Greater Point Mclntyre Area
[Lisburne, L6-26, Pt. Mclntyre,
and West Niakuk (NK-27)]
Floppy
Well Job # Log Description Date BL RF Sepia Disk
P2-07 ) .,~.~'~" PRODUCTION PROFILE 951 01 3 I 1
P2-12 ~ ! t' ~'~ PRODUCTION PROFILE 9 51 01 4 I 1
P2-16 ~ ~ / ?_ ~ INJECTION PROFILE 951012 1 1
SIGN
Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you.
DATE:
RECEIVED
NOV 02 '1995
Alaska Oil & Gas Co'ns. Commission
Anchorage
P E RM i T DATA
93-124 5q°l_ ,~
9~-124 6014
93-124 GR/CCL (JWL)
p, -
~3 124 MWD- ~ ~'
- D~R/~NO
93-124 MWD-DGR/CNO
93-124 MWD-DGR/EWR/FXE
93-124 MWD-DGR/EWR/FXE
93-124 PLS (STATIC)
93-124 USiT
u~_~ ±nc[ividua~ Well
Geo]_og~c~l Nateriais inventory
T DATA_PLUS
~~0.H~MWD,8370-12254
'~10189-I0996, CH-GR/CCL
~0200~!1010
~2&5"MD,8400-12300
~&5"TVD~6~27-8900
vA'_. 2&5"MD,8400-12300
~2&5~'TVD,6627-8900
~6-11010
8900-10520
Page' !
Date' 10/13/95
RUN DATE_RECVD
12/06/93
1 02/24/94
1 03/09/94
11/15/93
1/15/93
1 / 5/93
11/15/93
1 03/09/'94
1 01/03/94
yes ~~d received?
Are d~-v ditch samples required°
Was the well cored? yes ~__~nalysis & description
received?
Are well tests recluiredv. yes ~ived? yes---~--------~_~
ms mn complzance
%;[
!l~it ial
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 28 February 1994
RE: Transmittal of Data
ECC #: 6129.00
Data: NONE
Dear Sir/Madam,
Reference:
BP
E-23A (13-8-11-14)
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Prints/Films:
Sent by U.S. MAIL
GR/CCL FINAL BL Run # 1
PLS STATIC FINAL BL Run # 1
Run
%CL FIN_AL RF [~%-~
Received by:
Date:
Please sign and return to: Atlas Wireline Services
Petrophysical Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SIJSPEI~E)ED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
BP Exploration 93-124
3. Address 0 R I Gl NA! 8. APINumber
P. O, Box 196612, Anchorage, A/aska 99519-6612 .... 5o-029-21763-01
4. Location of well at surface 9. Unit or Lease Name
i ' ' ...... , : TM -" · Prudhoe Bay Unit
1820' SNL, 501' WEL, SEC. 6, T11N, R14E ~
lO.
Well
Number
At Top Producing Interval i"/'~';"2~'~E_~__I''~' ' ": ~ '! ¥'~~ 11.E'23AField and(13'8'11-14)Pool
At Total Depth !
3215' SNL, 1185' EWL, SEC. 8, T11N, R 14E . ...-~. ~ .: Prudhoe Bay Field/Prudhoe Bay Pool
5. Elevation in feet (indicate KB, DF, etc.) j6. Lease Designation and Sedal No.
KBE = 64.9' I ADL 28304
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions
10/15/93 11/4/93 12/24/93I N/A feet MSLI One
17. TotalDepth(MD+TVD) 18. PlugBaokDepth(MD+TVD 19. Directional Survey IO. DepthwhereSSSVset IliThickness of Permafrost
12300' MD/8899' 7-VD 12300' MD/8899' 'I'VD ~ [] I'~ [] 2203' f~t MD 950' (Approx.)
22. Type Electric or Other ko~s Run
MWD
23. CASING, LINER AND CEMENTING RECORD
SETT~ DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" Conductor Surface 110' 8 cu yds Concrete
13-3/8" 72# L-80/S-95 Surface 2793' 17-1/2" 1950 cu ft PF "E"/1951 cu fi PF
9-5/8" 47# L-80 Surface 8467' 12-1/4" 2316 cuft Class "G"
7-5/8" 29. 7# N-80 S TL 2983' 4405' 9-5/8" Uncemented casing patch
7" 26# L-80 8309' 11321' 8-1/2" 395 cu ft Class "G"
4-1/2" 12. 6t/ L-80 11186' 12300' 6" Uncemented-Slotted liner
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None- Slotted Liner 3-1/2", L-80 10919' 10920'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
1/15/94 I FIowing
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OiL RATIO
TEST PERIOD [~
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
RECEIVED
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Subsea
Sag River 10258' 8247'
Shublik 10299' 8286'
Top Sadlerochit 10373' 8357'
· · , ,
31. LIST OF A'H'ACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed .. Title Drillin9 Engineer Su.oervisor Date .~
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: E-23A
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 10/09/93 12:00
SPUD:
RELEASE:
OPERATION:
DRLG RIG: DOYON 9
WO/C RIG: DOYON 14
10/10/93 ( 1)
TD:llT10
PB:ll128
10/11/93 (2)
TD:ll710
PB:ll128
10/12/93 (3)
TD:llT10
PB:ll128
10/13/93 (4)
TD:ll710
PB: 8750
10/14/93 ( 5)
TD: 0
PB: 8750
TEST BOPS MW: 0.0 FSW
MOVE FROM E-32 TO E-23A. ACCEPT RIG @ 12:00 HRS. MAKE UP
MUD, CHOKE & KILL LINES. SPOT & BEAM JUNK FLUIDS TANK. RIG
UP TO TREE FOR CIRC. PULL BPV W/LUBRICATOR. CIRC. SAVE 80
BBLS FREEZE PROTECT DIESEL. MONITOR WELL. WELL STABLE. ND
TREE. NU BOPS. CHANGE RAMS FROM 3-1/2" TO 5-1/2"
TEST BOPS MW: 0.0 FSW
TEST BOPES. TUBING HANGER LEAKING. RU LUBRICATOR. PULL
TWO WAY CHECK FROM HANGER. RU FLOOR TO PULL TUBING. PULL
5-1/2" X 4-1/2" BTC-M, L80 TUBING. BREAK OUT TORQUE
NORMAL. CHANGE OUT TOP & BOTTOM RAMS TO 5". TEST BOP
STACK FROM 250 TO 5000 PSI, ANNULAR FROM 250 TO 3000 PSI.
POOH AFTER SETTING BRIDGE PLUG MW: 0.0 FSW
TEST BOP STACK TO 250 & 5000 PSI. TEST ANNULAR TO 250 &
3000 PSI. SET WEAR BUSHING. MU 9-5/8" HOWCO EZXV BRIDGE
PLUG ON 15 JTS HWDP. SLIP & CU 1690' DRILL LINE. PU 5" DP
RIH W/BRIDGE PLUG. SET BRIDGE PLUG AT 8750' CLOSE RAMS &
TEST 9-5/8" CSG TO 3500 PSI FOR 10 MIN. OK. DISPLACE WELL
TO XANVIS MUD. SPOT 18 BBLS 17PPG PILL ABOVE BRIDGE PLUG.
POOH. CUT & SLIP DRILL LINE. POOH.
SECTION MILL 9-5/8" CSG MW: 0.0 WBM
POOH, L/D HALLIBURTON RUNNING TOOL/PULL WEAR RING. CHANGE
OUT 9-5/8" MANDREL PACKOFF, TEST TO 5000 PSI, OK. M/U BHA,
P/U SECTION MILL (7200 SERIES MILLMASTER). RIH WITH
SECTION MILL. START MILLING 9-5/8" CSG @ 8467' (APPEARS
BLADES CUT THRU @ 1600 HRS). MILL SECTION 9-5/8" CSG TO
8498', ATTEMPT TO MAKE CONNECTION, BLADES WILLL NOT CLOSE
ATTEMPT TO JAR BLADES CLOSED, BLADES WILL NOT CLOSE, PULL
UP AGAINST 9-5/8" CSG TO MAKE CONNECTION, PULLED 150K OVER
TO MAKE CONECTION. MILL SECTION OF 9-5/8" CSG @ 8505',
REPORT TIME.
PERFORM HEISITATION SQUEEZ MW: 0.0 WBM
MILL SECTION 9-5/8" CSG TO 8512'. CIRC BTMS UP. POH W/
SECTION MILL. L/D SECTION MILL. TEST BOPE WITH 5" MULE
SHOE. REVERSE CIRC. PUMP 5BBLS H20 10BBLS H20 30 BBLS 17#
CMT. 5 BBLS H20, DISPLACE WITH MUD. PULL 12 STDS.
HESITATION SQUEEZE.
WELL · E-23A
OPERATION:
RIG : DOYON 9
PAGE: 2
10/15/93 (6)
TD: 8499
PB: 6700
10/16/93 (7)
TD: 9260' (9260)
10/17/93 ( 8)
TD: 9870' ( 610)
10/18/93 (9)
TD:10507' ( 637)
10/19/93 (10)
TD:10734' ( 227)
10/20/93 (11)
TD:10935' ( 201)
SIDETRACK WELL MW: 0.0 WBM
PERFORM HESITATION SQUEEZE ON CMT KICKOFF PLUG, FINAL
SQUEEZE PRESSURE @ 2000 PSI, HOLD SQUEEZE PRESS FOR 60 MIN.
BLEED BACK 1/2 BBL EST 7 BBLS SQUEEZED AWAY. CIRC BTMS UP.
POH, LAY DOWN 48 JTS DRILL PIPE. PULL WEAR RING, FLUSH BOP
STACK, SET TEST PLUG. TEST BOPE, 250 TO 5000 PSI, AOGCC
WAIVED WITNESSING TEST, J. HERRING. PULL TEST PLUG & SET
WEAR RING. M/U 8-1/2" BIT, P/U MOTOR & MWD, M/U BHA. RIH,
BRK CIRC EVERY 2000' WASH DOWN FROM 8043' TO 8330' TAG
SEMI-FIRM CMT., CLEAN OUT TO 8372' CIRC BTMS UP, CMT
SEMI-FIRM. DRLG SEMI-FIRM. DRLG SEMI-FIRM CMT FROM 8372'
TO 8472', KOP. ORIENT MOTOR & SIDETRACK WELL @ KOP 8472',
CMT SEMI-FIRM TO SOFT, TIME DRILL.
DRILL 8-1/2" OPEN HOLE MW: 9.9 VIS: 69
SIDETRACK WELL, TIME DRILL @ 4' FPH FROM 8499' TO 8627'
CHANGE OUT MUD, DISPLACE WELL TO BIOZAN MUD SYSTEM, INJECT
MILLING FLUID DOWN WELL E-32 9-5/8" X 13-3/8" ANNULUS @
3BPM 750 PSI. DRILL & SURVEY 8-1/2" OPEN HOLE FROM 8627'
TO 9260' @ REPORT TIME.
DRILL & SURVEY 8-1/2" OPENHOLE MW: 9.9 VIS: 66
DRILL & SURVEY 8-1/2" OPEN HOLE FROM 926' TO 9390' CIRC
BTMS UP, MIX & PUMP PILL. POH. CHANGE BIT & SERVICE MWD.
RIH. KELLY UP, WASH & REAM TO BTM FROM 9347' TO 9390', NO
FILL. DRILL & SURVEY 8-1/2" OPEN HOLE FROM 9390' TO 9864'.
POH TO CSG SHOE 8467', REPAIR BLOWER MOTOR ON MUD PUMP, RIH
TO 9864'. DRILL & SURVEY 8-1/2" OPEN HOLE TO 9870'
POH TO CHANGE BHA MW: 9.8 VIS: 64
DRILL & SURVEY 8-1/2" OPEN HOLE TO START OF BUILD SECTION @
10233' SLIDE W/MOTOR TO INCREASE BUILD RATE FROM 10233' TO
10507' TOP OF ZONE 3, WILL TRIP FOR ROTARY BHA TO DRILL
THIS SECTION. CIRC BTMS UP, MIX & PUMP PILL. POH TO CHANGE
BHA.
POH FOR BHA CHANGE MW: 9.8 VIS: 60
POH. CHANGE BIT, L/D DYNA-DRILL, M/U NEW BIT, P/U 1JTHWDP,
M/U GILIGAN ASSY. SERVICE MWD TOOL. RIH. SLIP & CUT DRILG
LINE. RIH TO 10476'. KELLY UP, WASH & REAM TO BTM, HOLLE
TIGHT & PACKING OFF, WORK PIPE UNTIL HOLE CLEANS UP & GOOD
CIRC. DIRLL & SURVEY THRU ZONE 3 WITH 8-1/2" ROTARY ASSY
FROM 10507' TO 10734'. CIRC BTMS UP, MIX & PUMP PILL. POOH
TO CHANGE BHA.
DRILLING MW: 9.8 VIS: 63
POOH FOR BHA & BIT CHANGE. TIGHT SPOT AT 10659. DRAG & HOLE
FILL NORMAL. LD BHA. PU MOTOR & MWD NUCL. TOOL. TEST SAME.
CHANGE JARS. RIH W/BHA #4 TO 10252'_ (BRK CIRC @ 4200' &
8400'). LOG WITH MWD FROM 10252 TO 10734'. DRILL FROM
10734' TO 10812' ART=i.0, AST-4.0.
WELL : E-23A
OPERATION:
RIG : DOYON 9
PAGE: 3
10/21/93 (12)
TD:l1067' ( 132)
10/22/93 (13)
TD:lll30' ( 63)
10/23/93 (14)
TD:11256' ( 126)
10/24/93 (15)
TD:10625' ( 0)
10/25/93 (16)
TD:10830' ( 205)
DRILLING MW: 9.9 VIS: 61
DRILL F/10812' TO 10959'. NOT ABLE TO SLIKE. AST = 1.0.
PUMP SLUG AND CBU. POOH FOR BIT. TS AT 10564' DOWNLOAD MWD
& CHANGE OUT BIT. RIH WITH BHA #4. BREAK CIRC AT 4200' AND
8400'. CIRC AT SHOE. DRILL STRING PARTLY PLUGGED. CONT TO
RIH. DRILL FROM 10959' TO 11067'. ANGLE & AZIMUTH OK.
DRILLING MW: 9.9 VIS: 62
DRILL FROM 10996' TO 11107'. MIX & PUMP SLUG. POOH.
DOWNLOAD & CHECK MWD TOOL. INSTALL MWD SOURCES. RIH. TRIP
IN HOLLE . DIRLL FROM 11107' - 11130'
POOH W/CMT STINGER MW: 9.9 VIS: 64
DRILL FROM 11149' - 11256'. CBU & PUMP SLUG. POOH. PULL
SOURCES & DOWNLOAD MWD. PU 2-7/8" HANDLING EQUIP. PU 33 JTS
2-7/8" PAC DP & MULE SHOE. RIH. CIRC TO CONDITION MUD. TEST
LINES TO 3000 PSI. PUMP 15 BBLS WATER, 70 BBLS PREM CMT.
CHASE W/5BBLS WATER. DIS W/RIG @ 7-10 BPM @ 2500 PSI W/167
BBLS MUD. CIP . EST TOC @ 10345' PULL 14 STUDS. REVERSE DP
VOL TO CLEAR PIPE.
TIME DRILLING MW:10.1 VIS: 55
POOH W/ CMT STRING. RIH. TEST BOPS. OK. M/U BHA. RIH. P/U
KELLY. DRILL CMT FROM 10194' TO 10620'. TIME DRILL TO
10625'
DRILLING MW:10.1 VIS: 68
TIME DRILL FROM 10624' - 10715'. DRILL FROM 10715' - 10830'
10/26/93 (17)
TD:10859' ( 29)
10/27/93 (18)
TD:10970' ( 111)
10/28/93 (19)
TD:l1321' ( 351)
REAMING TO BTM MW: 9.9 VIS: 63
DRILL FROM 10845' TO 10859'. CIRC. POOH. RIH W/ BHA #8.
RIH. TEST MWD CONT RIH. PU KELLY. WASH & REAM FROM 10692'
REAM FROM 10830' TO 10859'. DRILL
DRILL & SURVEY 8-1/2" OPEN HOE MW:10.0 VIS: 69
DRILL & SURVEY 8-1/2" OPEN HOLE FROM 10859'- 10952'. CIRC
BTMS UP, MIX & PUMP PILL. POOH. CHANGE BIT. TEST MWD. RIH.
KELLY UP, WASH & REAM FROM 10690'-10952', BTM. DRILL &
SURVEY 8-1/2" OPEN HOLE FROM 10952'-10970'.
CHANGE RAMS TO 7" MW:10.2 VIS: 78
DRILL & SURVEY 8-1/2" OPEN HOLE. CIRC. SHORT TRIP DP FROM
11321' TO 10386'. CIRC BTMS UP, MIX & PUMP HI-LOW SWEEP,
MIX & PUMP PILL. POH. L/D BHA, SERVICE MWD. BOPE. PREPARE
TO RUN 7" LINER.
WELL : E-23A
OPERATION:
RIG : DOYON 9
PAGE: 4
10/29/93 (20)
TD:l1321' ( 0)
10/30/93 (21)
TD:l1321' ( 0)
10/31/93 (22)
TD:l1505' ( 184)
11/01/93 (23)
TD:11595' ( 90)
11/02/93 (24)
TD:11597' ( 2)
11/03/93 (25)
TD:l1704' ( 107)
11/04/93 (26)
TD:12231' ( 527)
POOH. MW:10.2 VIS: 72
TEST BOPE. RIH W/ 7" LNR ON DP. CIRC. RIH W/ LNR. CIRC
TO BTM. PUMP 20 BBLS WATER, 70 BBLS ARCO SPACER, 70 BBLS
'G' CMT. DISP W/ MUD. BUMP PLUG W/ 4000 PSI. RELEASE F/
LNR. REV CIRC. POOH.
RIH TO CLEAN OUT 7" LINER MW: 9.4 VIS: 36
POH. CHANGE RAMS TO 5" & 3-1/2". TEST BOPE. OK. M/U 6" BIT
& BHA, ORIENT & SERVICE MWD. RIH. CIRC. MIX & PUMP PILL.
POH. CHECK BHA. M/U BIT & ORIENT, INSTALL MWD. RIH, CIRC.
@60 SPM 1750 PSI, RIH TO CLEAN OUT 7" LINER.
DRILL & SURVEY 6" OPEN HOLE MW: 9.0 VIS: 43
RIH TO TOPE OF 7" LINER @8309'. CIRC. RIH. KELLY UP & TAG
CMT @ 11197', CLEAN OUT CMT TO 11246' TEST 7" X 9-5/8'
LINER TO 3500 PSI. OK. DRILL CMT, LANDING COLLAR, FLOAT
CLOOAR & FLOAT SHOE, & 10' NEW HOLE TO 11331'. DISPLACE
WELL TO XANVIS FLO-PRO MUD SYSTEM. DRILL & SURVERY 6" OPEN
HOLE. DRILL & SURVEY 6" HORIZONTAL OPEN HOLE TO 11505'.
RIH WITH JUNK BASKET MW: 9.0 VIS: 60
DRILL & SURVEY 6" OPEN HOLE FROM 11505' TO 11595', BIT
TORQUING UP. CIRC & CONS HOLE FOR BIT TRIP. POOH, LOST #3
CONE FROM BIT. CHANGE BHA. RIH W/REVERSE CIRC. JUNK BASKET.
POH WITH JUNK MILL MW: 9.1 VIS: 61
RIH. CIRC. RIH, CIRC. POH. RIH WITH JUNK MILL. MILL FROM
11595' TO 11597'. CIRC BTMS UP. POH.
RIH. MW: 9.2 VIS: 61
POOH. L/D MILL. RIH W/ BIT, MWD. MAD PASS F/
11551'-11597' DRLG F/ 11597'-11704' CBU. POOH. CHANGE
BIT. RIH.
DRILLING MW: 9.3 VIS: 62
CONT TO RIH WITH BHA #14. DRILL FROM 11704-12231'.
11/05/93 (27)
TD:12300' ( 69)
11/06/93 (28)
TD:12300
PB: 8899
POOH MW: 9.3 VIS: 64
DRILL FROM 12231' TO 12300. CBU. POOH. RIH. CBU. SHORT TRIP
TO 7" SHOE. CBU. POOH.
TEST PACKER & CSG MW: 0.0 WBM
POOH. CUT & SLIP DRILL LINE. POOH LD BHA & HWDP. MU 4-1/2"
12.6#, L80, SLOTTED LINER. PUY 2-1/16 WORK STRING & RUN
INSIDE LINER. MU & INSPECT TIW SS PACKER ASSEMBLY. CIRC.
RIH. CIRC. TAG BMT @ 12300'. DROP LONG TIW DART. DISPLACE
W/SEAWATER AT 3 BPM. LET PACKER W/3500 PSI. TEST PKR & CSG.
OK.
WELL : E-23A
OPERATION:
RIG : DOYON 9
PAGE: 5
11/07/93 (29)
TD:12300
PB:12300
11/08/93 (30)
TD:12300
PB:12300
11/09/93 (31)
TD:12300
PB:12300
12/20/93 (32)
TD:12300
PB:12300
12/21/93 (33)
TD:12300
PB:12300
RIH W/7" PKR MW: 0.0WBM
DISPLACE 4-1/2" X OH ANNULUS W/250 BBLS SEAWATER. SPOT 30
BBLS BLEACH INSIDE LINER. PULL ABOVE 4-1/2" LINER. DISPLACE
WITH 570 BBLS SEAWATER. POOH. LD SETTING TOOL. PU TWI
SCOOPE HEAD GUIDE AND RUNNING TOOL. RIH W/SCOOPHEAD
OVERSHOT GUIDE ON DP. ENGAGE SS PACKER SLICKSTICK. POOH. MU
BAKER FB-1 PACKER, SEAL BORE EXTENSION, AND TAIL ASSEMBLY.
RIH W/TAIL ASSEMBLY ON DP.
ND BOPS MW: 0.0 WBM
RIH W/PRODUCTION PKR TAIL ASSEMBLY. DROP PKR SETTING BALL.
PRESSURE TEST 9-5/8" X 7" AND PKR TO 3500 PSI. OK. POOH AND
L/D DRILL PIPE. FREEZE PROTECT 9-5/8" W/150 BBLS DIESEL.
POOH. CHANGE BOP RAMS TO 5" N/D BOPE STACK.
RIG RELEASED. MW: 0.0 WBM
N/U 13-5/8" HOLDING FLANGE. TEST SAME. PULL BPV. RUN
COIL TBG HGR. SET IN FALSE BOWL. TEST SAME. SECURE WELL.
RIG RELEASED @ 09:00 HRS, 11/8/93.
RUNNING TBG MW: 8 5 Seawater
ACCEPT RIG 12-19-93 @ 08:00 HRS. ND ADAPTER, NU BOPE &
TEST. RIH, DISPLC DIESEL W/SW. POH, LDDP. RU & RUN TBG.
POH, LD TBG MW: 8 5 Seawater
SERV RIG, RUN TBG. MU HGR & CONTROL LINES & TET. LAND TBG.
PRESS TEST TBG. POH. LD TBG.
12/22/93 (34)
TD:12300
PB:12300
CUTTING THREADS FOR CSG MW: 8 5 Seawater
PU PKR, DP & RIH. TEST CSG, FOUND HOLE, POH. RU & RUN LOGS.
LD DP. CUTTING THREADS FOR CSG.
12/23/93 (35)
TD:12300
PB:12300
12/24/93 (36)
TD:12300
PB:12300
RE-RUN LINER MW: 8 5 Seawater
RONT TO RUN SCAB LINER. LOAD CSG. PU & RUN PKR, RIH. SET
PKR. PUMP DOWN PIPE. POH, LD LINER. RETURNED PKR TO SHOP.
RE-RUN SCAB LINER.
TEST CONTROL LINES MW: 8 5 Seawater
CONT RE-RUNNING CSG. SET PKR, TEST. POH, LDDP. PULL WEAR
RING & RE-RUN TBG. TEST CONTROL LINES.
12/25/93 (37)
TD:12300
PB:12300
MOVE RIG MW: 8 5 Seawater
LAND TBG, & TEST ANNULUS. CHG RAMS & ND BOPS. TEST CONTROL
LINES. RU. FREEZE PROTECT WELL. SECURE. RELEASE RIG
12-24-93 @ 2100 HRS.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
ORI®INAL
PAGE
PRUDHOE BAY DRILLING
PBU/E-23A
500292176301
NORTH SLOPE
COMPUTATION DATE: 11/ 5/93
DATE OF SURVEY: 110493
MWD SURVEY
JOB NUMBER: AK-MW-30079
KELLY BUSHING ELEV. = 67.95 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
8455 6627.00 6559.05
8641 6768.28 6700.33
8673 6794.08 6726.13
8769 6875.59 6807.64
8865 6961.66 6893.71
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
44 27 S 12.31 E .00 4501.00S 954.00E
37 4 S 24.39 E 5.78 4616.28S 991.23E
34 34 S 24.96 E 7.92 4633.21S 999.00E
28 43 S 28.83 E 6.47 4678.06S 1021.59E
24 15 S 28.55 E 4.65 4715.68S 1042.19E
VERT.
SECT.
4597.56
4718.45
4736.76
4785.78
4827.29
8960 7049.94 6981.99
9056 7139.60 7071.65
9151 7230.78 7162.83
9242 7319.15 7251.20
9342 7416.17 7348.22
21 15 S 27.54 E 3.15 4748.34S 1059.61E
18 19 S 26.80 E 3.09 4777.05S 1074.36E
15 20 S 26.33 E 3.14 4801.72S 1086.71E
14 30 S 27.79 E 1.01 4822.69S 1097.41E
11 13 S 23.95 E 3.40 4842.57S 1107.16E
4863.24
4894.68
4921.62
4944.58
4966.24
9438 7510.11 7442.16
9523 7593.81 7525.86
9628 7696.90 7628.95
9720 7787.77 7719.82
9809 7874.58 7806.63
10 18 S _24.06 E .96 4858.88S 1114.42E
9 43 S 22.26 E .78 4872.46S 1120.23E
11 45 S 19.20 E 2.01 4890.75S 1127.10E
10 50 S 17.53 E 1.04 4907.97S 1132.83E
11 19 S 22.67 E 1.24 4923.91S 1138.68E
4983.83
4998.42
5017.83
5035.93
5052.82
9907 7971.02 7903.07
10000 8062.68 7994.73
10092 8152.85 8084.90
10184 8242.92 8174.97
10274 8330.57 8262.62
11 16 S 21.89 E .16 4941.74S 1145.99E
10 39 S 19.62 E .81 4958.35S 1152.29E
11 52 S 19.25 E 1.33 4975.29S 1158.27E
11 31 S 15.26 E .96 4993.10S 1163.81E
14 8 S 17.62 E 2.96 5012.24S 1169.50E
5071.90
5089.55
5107.44
5126.06
5146.01
10367 8419.06 8351.11
10459 8503.92 8435.97
10551 8583.88 8515.92
10643 8658.65 8590.70
10656 8669.46 8601.51
19 35 S 24.97 E 6.32 5037.08S 1179.47E
26 21 S 23.46 E 7.37 5069.92S 1194.17E
32 21 S 27.14 E 6.82 5110.51S 1213.50E
38 32 S 29.99 E 6.96 5157.20S 1239.04E
39 27 S 28.39 E 9.76 5164.84S 1243.31E
5172.54
5207.98
5252.06
5303.59
5312.04
10685 8691.35 8623.40
10715 8713.23 8645.28
10746 8734.39 8666.44
10777 8755.06 8687.11
10810 8774.57 8706.62
10840 8791.44 8723.49
10870 8807.76 8739.81
10903 8824.17 8756.22
10938 8840.42 8772.47
10967 8852.96 8785.01
41 46 S 26.20 E 9.47 5181.53S 1251.91E
44- 14 S 23.77 E 9.91 5200.03S 1260.52E
47 28 S 22.01 E 11.42 5220.11S 1268.99E
51 8 'S 21.19 E 11.74 5242.46S 1277.83E
54 38 S 18.44 E 12.77 5266.72S 1286.56E
56 36 S 15.24 E 11.03 5290.32S 1293.69E
59 10 S 17.52 E 10.45 5315.25S 1301.03E
60 46 S 16.94 E 5.14 5342.38S 1309.44E
63 0 S 16.50 E 6.54 5371.51S 1318.19E
66 28 S 15.90 E 11.98 5397.04S 1325.60E
5330.33
5350.37
5371.92
5395.75
5421.41
5446.04
5472.01
5500.38
5530.76
5557.32
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PBU/E-23A
500292176301
NORTH SLOPE
COMPUTATION DATE: 11/ 5/93
DATE OF SURVEY: 110493
MWD SURVEY
JOB NUMBER: AK-MW-30079
KELLY BUSHING ELEV. = 67.95 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11003 8866.20 8798.25
11026 8873.19 8805.24
11044 8877.56 8809.61
11056 8880.14 8812.19
11075 8883.49 8815.54
70 10
74 31
76 54
78 49
81 9
S 12.93 E 12.88 5429.29S 1333.88E 5590.62
S 13.12 E 18.87 5450.70S 1338.83E 5612.59
S 13.73 E 13.83 5467.41S 1342.82E 5629.77
S 14.68 E 17.35 5479.05S 1345.77E 5641.78
S 15.64 E 13.00 5497.37S 1350.73E 5660.75
11087 8885.17 8817.22
11101 8887.09 8819.14
11118 8889.23 8821.28
11133 8891.17 8823.22
11147 8892.67 8824.72
82
82
82
83
84
3
31
41
1
3
S 15.18 E 8.84 5508.34S 1353.76E
S 14.30 E 6.89 5522.05S 1357.36E
S 14.32 E 1.09 5538.03S 1361.44E
S 13.89 E 3.42 5553.04S 1365.21E
S 15.88 E 16.64 5565.90S 1368.63E
5672.14
5686.31
5702.80
5718.28
5731.59
11165 8894.36 8826.41
11176 8895.30 8827.35
11193 8896.68 8828.73
11206 8897.67 8829.72
11224 8898.96 8831.00
85
85
85
85
85
9
26
31
43
45
S 17.07 E 9.03 5583.06S 1373.71E
S 15.97 E 9.87 5594.04S 1376.96E
S 15.05 E 5.26 5610.84S 1381.62E
S 15.09 E 1.49 5623.32S 1384.99E
S 16.89 E 10.38 5639.90S 1389.74E
5749.46
5760.90
5778.33
5791.27
58O8.50
11236 8899.87 8831.92 85 52
11254 8901.00 8833.05 86 41
11270 8901.78 8833.83 87 56
11278 8902.04 8834.09 88 18
11302 8902.66 8834.71 88 40
S 15.72 E 9.41 5651.84S 1393.23E
S 15.34 E 5.11 5668.66S 1397.90E
S 16.03 E 8.58 5684.65S 1402.39E
S 15.59 E 7.10 5692.43S 1404.60E
S 15.59 E 1.57 5715.16S 1410.94E
5820.93
5838.38
5854.99
5863.07
5886.66
11334 8903.32 8835.37
11366 8903.84 8835.89
11398 8904.43 8836.48
11428 8905.13 8837.18
11459 8905.87 8837.92
88 59
89 6
88 48
88 30
88 44
S 15.59 E .96 5746.07S 1419.56E
S 15.50 E .47 5776.79S 1428.11E
S 15.10 E 1.56 5807.71S 1436.57E
S 15.60 E 1.95 5836.85S 1444.57E
S 14.10 E 5.01 5866.16S 1452.34E
5918.74
5950.61
5982.67
6012.88
6043.20
11494 8906.51 8838.56
11522 8906.58 8838.63
11557 8906.39 8838.44
11586 8906.22 8838.27
11618 8905.79 8837.83
89 8
90_ 34
90 1
90 38
90 55
S 13.50 E 2.07 5899.99S 1460.65E
S 12.90 E 5.47 5927.77S 1467.16E
S 14.70 E 5.43 5961.43S 1475.43E
S 13.70 E 4.03 5989.60S 1482.56E
S 15.30 E 5.03 6020.85S 1490.64E
6078.04
6106.57
6141.22
6170.28
6202.56
11650 8905.33 8837.38
11664 8905.25 8837.30
11681 8905.27 8837.32
11714 8904.97 8837.02
11746 8903.78 8835.83
90 40
90 5
89 46
91 17
92 58
S 15.20 E .83 6052.15S 1499.17E
S 16.00 E 7.58 6064.70S 1502.68E
S 16.80 E 4.85 6081.66S 1507.67E
S 16.90 E 4.69 6112.57S 1517.03E
S 16.70 E 5.28 6143.23S 1526.29E
6235.00
6248.02
6265.69
6297.95
6329.94
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
PRUDHOE BAY DRILLING
PBU/E-23A
500292176301
NORTH SLOPE
COMPUTATION DATE: 11/ 5/9
DATE OF SURVEY: 110493
MWD SURVEY
JOB NUMBER: AK-MW-30079
KELLY BUSHING ELEV. = 67.95 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
11779 8902.01 8834.06 93 10 S 16.50 E .85 6174.86S 1535.72E
11795 8901.11 8833.16 93 2 S 16.40 E .99 6190.69S 1540.39E
11810 8900.34 8832.39 93 0 S 16.30 E .71 6204.65S 1544.49E
11839 8898.89 8830.94 92 37 S 15.00 E 4.57 6233.10S 1552.46E
11873 8897.67 8829.72 91 30 S 16.90 E 6.57 6265.42S 1561.69E
VERT.
SECT.
6362.92
6379.42
6393.95
6423.49
6457.08
11905 8896.99 8829.04 90 55 S 17.30 E 2.17 6296.37S 1571.21E
11934 8896.54 8828.59 90 51 S 16.00 E 4.46 6324.29S 1579.57E
11968 8896.04 8828.09 90 49 S 15.80 E .60 6356.63S 1588.78E
12001 8895.65 8827.70 90 33 S 15.30 E 1.76 6388.05S 1597.52E
12031 8895.31 8827.36 90 44 S 15.80 E 1.77 6417.19S 1605.63E
6489.42
6518.54
6552.15
6584.76
6614.99
12063 8894.83 8826.88 90 58 S 15.10 E 2.34 6447.64S 1614.04E
12094 8894.50 8826.55 90 12 S 16.90 E 6.17 6478.15S 1622.79E
12127 8894.94 8826.99 88 16 S 17.40 E 6.07 6509.52S 1632.47E
12159 8896.01 8828.06 87 54 S 17.50 E 1.19 6540.24S 1642.13E
12192 8897.02 8829.07 88 30 S 18.40 E 3.35 6570.81S 1652.04E
6646.57
6678.30
6711.08
6743.23
6775.30
12224 8897.80 8829.85 88 42 S 18.80 E 1.41 6601.19S 1662.26E
12260 8898.58 8830.63 88 48 S 18.30 E 1.40 6635.55S 1673.79E
12300 8899.42 8831.46 88 48 S 18.30 E .05 6673.20S 1686.24E
6807.26
6843.40
6882.96
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 6882.96 FEET
AT SOUTH 14 DEG. 10 MIN. EAST AT MD = 12300
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 165.82 DEG.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
PRUDHOE BAY DRILLING
PBU/E-23A
500292176301
NORTH SLOPE
COMPUTATION DATE: 11/ 5/93
DATE OF SURVEY: 110493
JOB NUMBER: AK-MW-30079
KELLY BUSHING ELEV. = 67.95 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
8455 6627.00 6559.05
9455 7526.73 7458.78
10455 8499.94 8431.99
11455 8905.77 8837.82
12300 8899.42 8831.46
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
4501.00 S 954.00 E 1828.00
4861.64 S 1115.65 E ' 1928.27 100.27
5068.12 S 1193.39 E 1955.06 26.79
5862.13 S 1451.32 E 2549.23 594.16
6673.20 S 1686.24 _E 3400.58 851.36
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PBU/E-23A
500292176301
NORTH SLOPE
COMPUTATION DATE: 11/ 5/93
DATE OF SURVEY: 110493
JOB NUMBER: AK-MW-30079
KELLY BUSHING ELEV. = 67.95
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8455 6627.00 6559.05 4501.00 S 954.00 E 1828.00
8511 6667.95 6600.00 4538.39 S 963.28 E ? 1843.28 15.28
8640 6767.95 6700.00 4616.04 S 991.13 E 1873.01 29.74
8760 6867.95 6800.00 4674.30 S 1019.56 E 1892.29 19.28
8872 6967.95 6900.00 4718.14 S 1043.52 E 1904.12 11.83
8980 7067.95 7000.00 4754.45 S 1062.79 E 1912.25 8.13
9086 7167.95 7100.00 4785.18 S 1078.46 E 1918.05 5.80
9190 7267.95 7200.00 4810.86 S 1091.23 E 1922.09 4.04
9293 7367.95 7300.00 4833.26 S 1102.79 E 1925.23 3.13
9395 7467.95 7400.00 4851.88 S 1111.29 E 1927.31 2.08
9496 7567.95 7500.00 4868.36 S 1118.56 E 1928.92 1.61
9598 7667.95 7600.00 4885.06 S 1125.12 E 1930.53 1.61
9700 7767.95 7700.00 4904.35 S 1131.69 E 1932.58 2.06
9802 7867.95 7800.00 4922.68 S 1138.17 E 1934.46 1.88
9904 7967.95 7900.00 4941.17 S 1145.76 E 1936.44 1.98
10006 8067.95 8000.00 4959.28 S 1152.63 E 1938.30 1.86
10108 8167o95 8100.00 4978.29 S 1159.32 E 1940.32 2.02
10210 8267.95 8200.00 4998.20 S 1165.24 E 1942.45 2.14
10313 8367.95 8300.00 5021.86 S 1172.93 E 1945.52 3.07
10419 8467.95 8400.00 5054.68 S 1187.47 E 1951.85 6.32
10532 8567.95 8500.00 5101.74 S 1209.08 E 1964.55 12.70
10654 8667.95 8600.00 5163.75 S 1242.72 E 1987.04 22.50
10798 8767.95 8700.00 5258.19 S 1283.60 E 2031.00 43.95
11008 8867.95 8800.00 5434.54 S 1335.08 E 2140.96 109.96
11035 8875.50 8807.55 5458.86 S 1340.73 E 2159.50 18.54
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 10 February 1994
RE: Transmittal of Data
ECC #: 6129.00
Data: NONE
Dear Sir/Madam,
Reference:
BP
E-23A (13-8-11-14)
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes:
Sent by U.S. MAIL
GR LDWG TAPE+LISTING
Run ~ 1
Please sign and return to: Atlas Wireline Services
Petrophysical Services
5600 B Street
Suite 201
Received by:
Date:
Anchorage, AK 99518
Attn. Rodney D. Paulson
/
"-'qCHLUMBERGER WELL SERVICES t---~ --
A DIVISi~. JF SCHLUMBERGER TECHNOLOGY CORF *TION
HOUSTON, TEXAS 77251-2175
PLEASE REPLY TO
DEC-2 8 ~FJ3 SCHLUMBERGER WELL SERVICES
Pouch 340069
Prudhoe Bay, AK 99734-0069
Attn: Bernie/Shelley
Bp Exploration
900 E. Benson Blvd., MB 3-3
Anchorage, AK 99519-6612
Attention: Petrotechnical Data Center
Enclosed ore 1 BLprin" tsofthe USIT, Run 1, 12/21/93
Company BP Exploration ~Db ~/~C_2~
Well E-23A
on:
I
Field Prudhoe Bay
Additional prints are being sent to:
2 BL prints, I RRolled Sepia
ARCO Alaska, Inc. AT0-1529
P. O. Box 100360
Anchorage, AK 99510-0360
A~tn: .Prudhoe Records Clerk
1BL~~r,nts, 1RFolded ~
Alask~a'Oil & Gas Conservation
/Commission
3,~01 Porcuoine Dr~ve
/~tchora~e.-AK 99501 ~/
I__BL__p rints
Exxon Company U, S.A.
800 Bell St., Suite 3083
Houston, TX 77252
Attn: Susan Nisbett
County North Slope State.. Alaska
1BL .prints
Mobil Oil Company
12450 Greenspoint Drive
Houston, TX 77060
Attn: Barbara Sullivan, Suite .550B
1BL prints
Chevron U.S.A., Inc,
Technical Information Services
P. O. Box 1635
_~on~_.TX 7725]
Attn~ Ok-Cha Sea
~prints
1BL prints
Phillips Petroleum Company
P, O, Box 1967
Houston, TX 77251-1967
Attn: Monica Warnken, Room B-2
The film is_returned to BP.
We appreciate the privilege of serving you.
prints
Date:
' "'~ 0//
Ve~ truly yours,
SCHLUMBERGER WELL SERVICES
SwS-- 1327.F
CH (SBL/1RF/1RR)
Raymond N. Dickes
DISTRICT MANAGEIR
CI !::t ! I__1... I ~ G S G I::l~dl C E S
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs - E-23A AK-MM-931024
December 2, 1993
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this of this transmittal letter to the attention of:
Paul Radzinski, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG Format LIS Tape with Verification Listing.
Received:
Date
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 .o Fax (907) 563-7252
A Baroid Company
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs - E-23A AK-MM-931024
November 11, 1993
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this of this transmittal letter to the attention of:
Paul Radzinski, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
2" x 5" MD Resistivity and Gamma Ray Logs:
T' x 5::_MD Neutron & Density Logs:
2" .X 5"~D Resisfivi~ ~d ~mma Ray ~gs:
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
Received:
Date
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252
A Baroid Company
MEMORANDUi ,
State of laska
Alaska Oil and Gas Conservation Commission
TO: David Jo h_~_~on, DATE:
Chairman
THRU: Blair Wondzell, -~'~ FILE NO:
P. I. Supervisor
FROM: Bobby Foste~.-'F- SUBJECT:
Petroleum Inspector
October 29, 1993
AHFIJ3AD.doc
BOP Test- Doyon 9
BPX-PBU-E-23-A
PTD # 93-124
P B Field
Friday, October 29, 1993: I traveled to BPX's E - 23 - A and witnessed the
BOPE test. As the attached AOGCC BOP Test Report shows there were two
failures. The two choke line valves on the lower mud cross leaked. They were
replaced and tested OK. There were minor delays due to leaking valves on the
test pump and test line which were repaired.
Summary: I witnessed the BOP test on Doyon 9 an BPX's E - 23 - A - 2
failures - test time 5 hours. - ~. ¢~,,~'(c~,e~.
Attachment: AHFIJ3AD.XLS
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: Workover: REDRILL
Drlg Contractor: DOYON Rig No.
Operator: BPX
Well Name: E- 23A
Casing Size: 7" Set @ 11,320
Test: Initial Weekly X Other
PTD #
Rep.:
Rig Rep.:
Location: Sec.
DATE: 10/29/93
g3- 124 Rig Ph.# 65g- 4831
NICK SCALES
RON WILSON
6 T. 11N R. 14E Meridian U
Test
MISC. INSPECTIONS: FLOOR SAFETY VALVES: Quan. Pressure P/F
Location Gen.: OK Well Sign OK Upper Kelly / IBOP 1 I 300/5000 P
Housekeeping: OK (Gert) Drl. Rig OK Lower Kelly / IBOP 1 J)/5(/,5C.,og P
Reserve Pit N/A Ball Type 1 ~'5(:X:;O P
Inside BOP I I/~:~.~'/~'~ P
BOP STACK: Quan.
Annular Preventer 1
Pipe Rams
Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve 1
Test
Pressure
300/3000
300/5000 P
300/5000 P
300/5000 P
300 / 5000 P
300 / 5000
300/5000
300 / 5000
P/F Test
P Pressure
15 300/5000
P
P
P
MUD SYSTEM: Visual Alarm
Trip Tank YES YES
Pit Level Indicators YES YES
Flow Indicator YES YES
Gas Detectors YES YES
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
38 300/5000
PIF
P
P
P
Functioned
Functioned
ACCUMULATOR SYSTEM:
System Pressure 3,100 J P
Pressure After Closure ~,600 J P
200 psi Attained After Closure 0 minutes 35
System Pressure Attained 2 minutes 50
Blind Switch Covers: Master: YES Remote:
Nitgn. Btl's: 5 @ 2100
Psig.
sec.
sec.
YES
Number of Failures: 2 ,Test Time: 5.0 Hours. Number of valves tested 26 Repair or Replacement of Failed
Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax N 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
Two valves failed on the lower mud cross - Replaced and retested- OK.
Also had problems with leaking test valves from test pump to test joint
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c - Inspector
STATE WITNESS REQUIRED?
YES NO X
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
FI-021L (Rev. 7/93) AHFIJ3AD.XLS
STATE OF ALASKA .... ' :.
ALA,.,.,A OIL AND GAS CONSERVATION COMMISSlL,~4 ".-' ...
APPLICATION FOR SUNDRY APPROVALS
Abandon Suspend Operation Shutdown Re-enter suspended well ("Q'~";/**//
Alter casing Repairwell Plugging Time extension Stimulate /// I
Pull tubing Vadance Perforate Other
I
6. Datum elevation (DF or KB)
' KBE=65.15 f~et I
1. Type of Request:
Change approved program X
2. Name of Operator 5. Type of Well:
BP Exploration Development X
Exploratory __
3. Address Stratigraphic__ 7. Unit or Property name
P. 0. Box 196612, Anchorage, Alaska 99519-6612 set, ce__ 'Prudhoe Bay Unit
4. Location of well at surface 8. Well number
1820' SNL, 501' WEL, SEC. 6, T11N, R14E
At top of productive interval
3039'NSL, 4390' WEL, SEC. 8, T11N, R14E
At effective depth
N/A
At total depth
2155' NSL, 4011' WEL, SEC. 8, TIN, R14E
E-23A (13-8-11-14)
9. Permit number
93-124
10. APl number
50- 50-029-21763-01
11. Field/Pool
Prudhoe Bay Field/Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
11710 feet
9024 feet
11651 feet
8984 feet
Plugs (measured)
Junk (measured)
Two 3.8" OD x 3/16" T SS Rings from jet pump,
lost on 5/3/89 @ 11592' or below (on btm.)
Length Size Cemented Measured depth
110' 20" 8 cu yds Concrete 110'
2753' 13-3/8" 3902 cu ft PF 2793'
10673' 9-5/8" 2316 cu fl Class "G" 10713'
1274' 7" 413 cu ft Class "G" 11710'
measured 11512'-11537', 11563'-11580', 11593'-11601', 11629'- 11634'
true vertical
True vertical depth
110'
2645'
8299,
9O24'
RECEIVED
Tubing (size, grade, and measured depth) 4-1/2", 12.6tl, L-80 Tubing cut and pulled @ 10203' MD
Packers and SSSV (type and measured depth) Packer@ 10385'
OCT 1 5 199,3
Alaska 0il & Gas Cons. Corem
Anchorage
13. Attachments
Description summary of proposal x Detailed operations program __
BOP sketch x
14. Estimated date for commencing operation
10/15/93
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil x Gas
Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~/~. ~~ ~ Title DrillingEngineerSupervisor
· '~ ) ,~ FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity BOP Test ~ Location clearance
Mechanical Integrity Test /Subsequent form required 10- ¥0 ~7
Approved by order of the Commission
Form 10-403 Rev 06/15/88
Date( 0 ,-' (~--~-'
cop J,, Approval No. ~3 -~ ~3
Returned
Commissioner Date / ~,// ¢? ~ '~
SUBMIT IN TRIPLICATE
St0~'~
E-23, SUNDRY: REV TO DRILLING
ERMIT
Summary Procedure-Revision:
The completion operations for E-23A has changed relative to what is
documented in the original Permit Request. Specifically, the completion of E-
23A will now be conducted with a CTU after the rig leaves location instead of
with the Drilling Rig. The steps involved are as follows:
With Drilling Rig:
Steps 1-22 from the original Summary Procedure for the E-23A remain the
same.
23.
24.
25.
(After the 7" and 4 1/2" liners are set), PU 3 1/2" isolation packer (with a
tubing tail) with a positive tubing tail plug and set within 7" liner with DP.
Test packer/casing to 3500 psi.
Displace well again w/seawater with corrosion inhibitor.
POOH with DP to 2000 tvd, freeze protect 9 5/8" casing from 2000'tvd to
surface. LD DP.
26.
Thru BOP stack, MU 13 1/2" x 6 13/16" False Bowl w/a 6 13/16" BPV
installed. RILDS. Test same to 3000# w/BOP blind shut.
27. ND BOP stack.
28.
29.
NU 13 5/8" holdown flange and 7.06" bore valve. Test same thru port.
Pull 6 13/16" BPV.
30.
31.
32.
33.
34.
MU CTU hanger in the false bowl w/4 1/16" 2 way check.
MU blind flange to 7" valve w/blind and tap.
Test against 7" valve.
Test against 2 way check in CT hanger.
RDMO rig from location.
Post Rig Work:
MIRU CTU. Run coiled tubing. Pressure test tree. RDMO CTU.
RILDS.
RECEIVED
OCT 1 5 199;~
Alaska 0ii & Gas Cons. commission
Anchorage
CKH Page 1 10/14/93
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
August 30, 1993
Terry Jordan
Drilling Engineer Supervisor
BP Exploration (Alaska), Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit E-23A
BP Exploration (Alaska), Inc.
Permit No. 93-124
Sur. Loc. 1820'SNL, 501'WEL, Sec. 6, TllN, R14E, UM
Btmnhole Loc. 2155'NSL, 4011'WEL, Sec. 8, TllN, R14E, UM
Dear Mr. Jordan:
Enclosed is the approved application for permit to redrill the above
referenced well.
The permit to redrill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given
to allow a representative of the Commission to witness a test of BOPE
installed prior to drilling new hole. Notice may be given by contacting
the Commission petroleum field inspector~on the North Slope pager at
659-3607.
Sincerely,
Russell A. Douglass
Commissioner
BY ORDER OF THE COMMISSION
dlf/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA ....
ALASKA uIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
Re-Entry [] DeepenElI Service [] Development Gas [] SingleZone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration KBE = 58.45 feet Prudhoe Bay Field/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28304
4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 20 ^^c 25.025)
1820' SNL, 501' WEL, SEC. 6, T11N, R14E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
3039' NSL, 4390' WEL, SEC. 8, T11N, R14E E-23A (13-8-11-14) 2S100302630-277
At total depth 9. Approximate spud date Amount
2155' NSL, 4011' WEL, SEC. 8, T11N, R14E 9/5/93 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MD and TVD)
property line
ADL 28305-2155' feet No close approach feet 2560 12381' MD/8937' TVD feet
16. To be completed for deviated wells 117. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth ~oo feet Maximum hole anglego. 6~ 0 !Maximum surface 3330 psig At total depth (TVD) ~800'/4390 psig
18. Casing program Specifications Setting Depth
s~ze Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 29# NT-80S NSCC 3068' 8350' 6550' 11418' 8948' 553 sx Class "G"
6" 4-1/2" 12.6# L-80 NSCT 1113' 11268' 8886' 12381' 8937' Uncemented
F_. I v
AU G 0
19. To be completed for Ftedrill, Re-entry, and Deepen Operations.
Present well condition summary Alaska Oil & Gas Cons. C0mrnissi0~
Total depth: measured 11710 feet Plugs (measured) Anchorage
true vertical 9024 feet
Effective depth: measured 11651 feet Junk (measured) Two 3.8" OD x 3/16"T SS Rings from jet pump,
true vertical 8984 feet lost on 5/3/93 @ 11592' or below
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor 20" 8 cu yds Concrete 110' 110'
S u rface 2753' 13-3/8" 3902 cuft PF 2793' 2645'
I ntermed late 10673' 9-5/8" 2316 cu fl "G" 10713' 8299'
Production
Liner 1274' 7" 413 cuft "G" 11710' 9024'
Perforation depth: measured 11512'-11537', 11563'-11580', 11593'-11601', 11629'-11634'
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program l'71
Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirementsr-I
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed . Title Drilling En~)ineerSupervisor Date~-/~-~'3
Commission Use Only
Permit Number APl number IApproval date See cover letter
~ 3 -,,/-,'~/--7/ 50- 0:~---~'-- .,~./7~;,.?' -(:3 / J ~'..- '~ ~ - ~' ~ for other requirements
Conditions of approval Samples required [] Yes J~No Mud Icg required []Yes IX1 No
Hydrogen sulfide measures [] Yes ~ No Directional survey requ~reo ~[] Yes [] No
Required working pressure for BOPE D-12M; 1-13M; ,I~5M; I-IIOM; I-I15M;
Other: ORIt~INA[ SIGNED BY by order of
Approved by RUSSELL A. OOUGLAI~ Commissioner me commission Date ~'~/~'-'/~-~'
Form 10-401 Rev. 12-1-85 Submit in triplicate
· 23A Drilling Permit Informa
Summary Procedure-
!
,
.
,
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
Pre-rig work: Kill the well. Lay a cement plug across the perforations according to state
regulations for well abandonment. Cut the 4-1/2" tubing near 10.000' MD.
Freeze protect the well and set a back pressure valve (BPV.) Test the
intermediate casing pack-off to 5000 psi.
Move in the workover rig. Test the 9-5/8" intermediate casing pack-off if not done dudng
the pre-rig work.
Pull the BPV. Circulate the diesel freeze protection cap from the well and recover for future
use.
Install a BPV and a test tree plug. Remove the production tree.
Install BOP's and test to 5,000 psi. Remove the test plug and BPV.
Pull out of the hole and lay down the 4-1/2" tubing.
Replace the 9-5/8" casing pack-off as needed.
Set a bridge plug @ 8,850'MD
Spot a 18 ppg pill on bottom and cut a 50' section in the 9-5/8" casing starting from about
8600' MD.
Spot a balanced cement kick-off plug (180 cubic feet minimum) through open-ended
drillpipe from 100' below the base of the section to 200' above the top of the section.
Run_in with an 8-1/2" steerable drilling assembly and dress the cement to 5' below the
section top. Kickoff and directionally drill to the target at 8950'TVD-ss as per the attached
directional plan. Obtain Gamma RaW Resistivity / Neutron / Density formation evaluation
logs while drilling in zones designated by Geology.
Run a 7" 29# 13Cr / L-80 NSCC liner assembly to bottom in the 8-1/2" hole, space the
13Cr to L-80 crossover at 300'MD above the Sag River formation. Space the liner hanger
and top isolation packer about 150' up inside the 9-5/8" casing, r~ ~,,_~'-~-
Cement the 7" liner with 643 ft3 of class G cement. The cement volume calculation is
based on 60% excess of open hole volume plus 150' of lap and 40' of shoe volume.
Re-test BOP's as needed.
Run in with 6'__~' steerable drilling assembly with directional/Gamma Ray MWD on 5-1/2" x
3-1/2" drillpipe. Drill out the float shoe.
Displace the well with a non-damaging (Xanvis polymer) drilling fluid.
Drill approximately 1000' of 6" hole to TD as per the Geologist / Operations Engineer
onsite.
Make a conditioning trip with a 6" hole-opener for the open hole section with a 7" casing
scraper spaced to clean the liner.
Install a 4-1/2" L-80 slotted liner with 7" Baker packer / hanger. Run in on 4-1/2" x 3-
1/2" drillpipe with a 2-1/16" wash string inside the slotted liner. Space packer / hanger
to be set within 100' of the 7" liner shoe.
PoSition packer 100' above the 7" liner shoe and circulate. Set the packer and test the
setting. Release from the packer / hanger and displace the drilling fluid with filtered
seawater but no corrosion inhibitor. Spot the breaker inside the slotted liner.
Pull the wash string up just above the hanger and circulate well clean with filtered and
inhibited seawater. Pull out of the hole and lay down the wash string.
Retest 9-5/8" wellhead packoff and replace as needed.
Run the 3-1/2" L-80 completion stdng assembly. Space out, attach the tubing hanger,
and latch the completion.
Install a BPV and test plug. Remove BOP's.
Install and test the production tree to 5000 psi. Pull tree test plug and BPV.
Test the tubing x casing annulus to 3500 psi for 30 minutes.
Shear RP valve in the upper GLM and freeze protect the well.
DH Page 1 8/27/93
'--~-23A Drilling Permit lnf0rm¢ n
Summary Procedure (con't)'
28. Set a BPV. Release the rig.
29. Complete appropriate documentation and hand-over the well to Production
DH Page 2 8/27/93
]Well Name: ]E-23A
Redrill Plan Summary
Type of Redrill (producer or injector): ]Producer!
Surface Location:
Target Location:
] Bottom Hole Location'
3459' FSL 501' I-;EL S06 TllN R14E
3039' FSL 4390"FEL S08 T1 iN R14E
2155' FSL 4011' FEL S08 T11N R14E
] AFE Number: ] 4P0495 ]
Estimated Start Date: ] Sept 5, 93
Imf): 112381' I
]Rig: ]Nabors 1SE
] ] Operating days to complete: ] 26
[TVD: 18937' ] KBE:
Well Design (conventional, slimhole, etc.):
] 58.45'
]Horizontal Sidetrack Well
Objective: '] Improve oil production in Zone 1 by dr/llin~ a horizontal well
Mud Program:
A 9.5 - 10.00 ppg Biozan polymer/KC1 water based mud will be used.
Special design An 8.8-9.0 ppg Xanvis polymer/KC1 water based mud will be used in the
considerations 6" horizontal hole section.
Depth Density PV YP INT 10MIN FL OIL SOLIDS
(TVD) (PPG) (CP) (g/FI') GEL GEL cc/30min (%) (%)
KOP' 9.5 10 15 5 10 10 0 5
to to to to to to to to to
TD' 10.0 18 30 15 30 5 0 8
Directional:
I~oe: 1 8500'm)
Maximum Hole Angle: { 90.65°
Close Approach Well: ! NONE
The above listed wells will be secured during the close approach.
RECEIVED
Redrill Plan Summary
AU G 2 0 1993
Alaska 0il & Gas Cons. CommisSion
Anchorago
Page 1
Casing/Tubin:: Pro~ ram:
Hole Size Wt/Ft
Hole Siz~ Csg/ ' Wt/Ft' Grade Conn Length Top Btm
Tbg O.D. MD/TVD MD/TVD
8-1/2" 7" 29# NT-80S NSCC 3068' 8350' / 6550' 11418' / 8948'
6" 4-1/2" 12.6~ L-80 NSCT 1113' 11268'/8886' 12381'/8937'
,,
Cement Calculations:
[ Liner Size: [ 7"
Basis:] 60¢0 open hole ex~ess, 40' shoe joint, 150' liner lap and 150' excess above line~' with DP.
,
Total Cement Volume: 553 sxs of Class G Blend @ 1.18 ft3/sx
.
Liner Size:
! · !
Basis:1
Total Cement Volume:
Well Control:
Well control equipment consisting of 5000 psi W,P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AC)GCC.
A U 6 ~ 0 199~
Alaska Oil & Gas Cons. Commission
Anchorage
Redrill Plan Summary Page 2
PRuDHO
E BAY
DRILLING
B
7500t
INCLN
44.18
!
90.65
90.65
90.65
Marker Identification MD BKB' 5ECTN
A~ TIE-IN 8500 6657 4545
BI END OF 6/200 CURVE~I 92~6 7303 48,~
C] START 6/300 CURVE~2 9927 60J4 4826
DJ END OF 6/~00 CURVE¢2 JJ4J8 8948 579J
E) TARGET t~4J8 8948 579!
F) TD 1238~ 8937 675~
I !
8000-- '
8200-
8~00
8600-
8800-
9000-
g2oom-----~--
4200
I
_ .. r
4400 4600 -4800
I
5000
E-23A (P2)
VERTICAL SECTION
Section al: J55.59
TVD Scale.: J inch = 400 feet
Dep Sca]e.; ] inch = 400 feet
Drawn ..... : 08/04/93
VIEW
£reat Land OJrectJonal DmJllJng
Alaska Oil &
j..
5200 5400 5600 5800 BO00 B201
Section Departure
6400 6600
I
6800 7000
PRJDHOE
Marker IOcntifi:ation MD
AJ TiE-IN 8500 4537
BI EN~ 0F 6/JO0 ~URVE~3 9226 4800
CJ SIART 6/200 CURVE~2 9927 4834
DJ END OF 6/~00 CURVE~2 1~4~B .... 5700
El TARGET J34)B 5700
F) lO 1238! 6583
BAY
E/W
962
3022
~41~
1413
1794
DRILLING
E-23A (P2)
PLAN
ICLOSURE · 6823 feet at AzimuLh 164.76
!DECLINATION.' 29.953 E
i$CALE · J ~nch = 1200 feet
'DRAWN. ' 08/04/93
,, ii
Great Land Ojrectiona] OrJ]]Jng
600-
6oo~
.1200-
1BO0-
2,.qO0
KO
7800"
~200 3600 300D 2~00 ~800
1200
: I
600 -0 600
<- WEST · EZST ->
i200
AUG
Oil & G~
1800
!IV
!0 19
Cons.
]orag~
'D
;OM~liS$i' 'p
2~00
!
"
3000
3600
4200
STATE OF ALASKA
., _ ,<A OIL AND GAS CONSERVATION COMMIS..,,,.)N
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon x Suspend__ Operation Shutdown__ Re-enter suspended well__
Alter casing__ Repair well__ Plugging x Time extension __ Stimulate __
Change approved program __ Pull tubing__" Variance__ Perforate.__ Other x
__ Plugback for redrlll
2. Name of Operator
Standard Alaska Production Company
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1820' SNL, 501' WEL, Sec. 6, T11N R14E
At top of productive interval
2645' SNL, 4656' WEL, Sec. 8, T11N, R14E
At effective depth
3173'SNL, 4640 ' WEL, Sec. 8, T11N, R14E
At total depth
3216' SNL, 4635' WEL, Sec. 8, T11N, R14E
5. Type of Well:
Development x
Exploratory __
Stratigraphic __
6. Datum elevation (DF or KB)
KB = 68. O5
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
E-23 (13-8-11-14)
9. Permit number
87-115
10. APl number
50- 029-21763
11. Field/Pool
Prudhoe Bay Pool
feet
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
11,710 feet Plugs (measured)
9024 feet
11,651 feet Junk (measured)
8984 feet
Length Size Cemented
Two 3. 8" OD x 3/16" T SS Rings from jet pump,
lost on 5/3/89 @ 11592' or below (on btm.)
Measured depth True vertical depth
20" 8 cu. yds. Concrete 110'
2753' 13-3/8" 3902cu. ft. Permafrost 2793'
10,673' 9-5/8" 2316 cu. ft. Class G 10, 713'
1274' 7" 413cu. ft. Class G 11,710'
measured 11512'-11537', 11563'-11580', 11593'-11601', 11629'-11634'
true vertical
Tubing (size, grade, and measured depth) 4-1/2" 12.6tt L-80 AB Mod. Butt. 10,493'
5-1/2" 17# L-80 AB Mod. Butt. 2480'
Packers and SSSV (type and measured depth) Packer@ 10,385'
SSS V @ 2O24'
110'
2645'
8299'
9024'
RI ( EIVED
AU G 2 0 199
Alaska 0ii & Gas Cons, Cornrnisston
Anchorage
13. Attachments
Description summary of proposal x Detailed operations program __
BOP sketch
14. Estimated date for commencing operation
8/26/93
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil x Gas
Suspended__
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
'~'f~. ~-~'~ Title Drilling Engineer Supervisor
Signed
FOR COMMISSION USE ONLY
Date
Conditions of approval: Notify Commission so representative may witness.
Plug integrity BOP Test__
Mechanical Integrity Test~
Approved by order of the Commission
Form 10-403 Rev 06/15/88
.~ Oo~"J J Approval No.,~,...~
Location clearar~e2 ..;~,.,.~.,<>. _~, /~ ~,~
Subsequent f~r ~m~ r e ~~". ;..~;::~q~' O~ ~//"~//'-.~/
D~ ¥, ,~OhRS Gommissioner Date
SUBMIT IN TRIPLICATE
ITEM
(1) Fee
(2) Loc
** CHECK LIST FOR NEW WELL PERMITS :"*
AP~PROVE DAzTE ·
thru
(3) Adm i n ~.~_..
[10 & 13]
(4) Casg _~) ~-~o-~
[1
4 thru 22]
(5) BOPE ~ ~--~° 'fi3
[23 thru 28]
YES
1. Is permit fee attached ............................................... ~
2 Is well to be located in a defined pool .......
·
3 Is well located proper distance from property line
4. Is well located proper distance from other wells ..................... ~_
5. Is sufficient undedicated acreage available in this pool .............
6. Is well to be deviated & is wellbore plat included ...................
7. Is operator the only affected party .................................. L
8. Can permit be approved before 15-day wait ............................
·
Company ,/~//0 Lease $ Well ~/~7~
NO
REMARKS
o
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
Does operator have a bond in force ...................................
Is a conservation order needed ......................................
Is administrative approval needed ....................................
Is lease number appropriate ..........................................
Does well have a unique name & nL[nber ................................
Is conductor string provided .........................................
Will surface casing protect all zones reasonably expected
to serve as an underground source of drinking water ..................
Is enough cement used to circulate on conductor & surface ............
Will cement tie in surface & intermediate or production strings ......
Will cement cover all known productive horizons .....................
Will all casing give adequate safety in collapse, tension, and burst.
Is well to be kicked off from an existing wellbore ...................
Is old wellbore abandonment procedure included on 10-403 .............
Is adequate wellbore separation proposed .............................
Is a diverter system required ........................................
Is drilling fluid program schematic & list of equipment adequate .....
Are necessary diagrams & descriptions of diverter & BOPE attached ....
Does BOPE have sufficient pressure rating -- test to
Does choke manifold comply w/API RP-53 (May 84) ......................
Is presence of H2S gas probable ......................................
(6) Other
[29 th
Con c,
[32]
(8) Addl
geology' encjineer inq'
DWJ MTM RAD
rev 6/93
jo/6.011
29.
30.
31.
32.
33.
FOR EXPLORATORY & STRATIGRAPHIC WELLS:
Are data presented on potential overpressure zones ...................
Are seismic analysis data presented on shallow gas zones .............
If offshore loc, are survey results of seabed conditions presented...
Name and phone n~nber of contact to supply weekly progress data ......
./
Additional
requirements ............................................. ~
Additional remarks'
INITIAL GEOL UNIT ON/OFF
POOL CLASS STATUS AREA SHORE
MERIDIAN' UM,~
SM
WELL TYPE' Exp/~-------v~ Inj
Redrill~ Rev
O
~O
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information-of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Tape Subfile~2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
E-23A (13-8-11-14)
500292176301
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
09-FEB-94
6129.00
J. DAHL
M. CLEARY
6
liN
14E
1820
501
68.05
65.20
30.20
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY: ATLAS WIRELINE SERVICES
BASELINE DEPTH
$
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
9.625 8508.0 47.00
7.000 11321.0 26.00
4.500 12295.0
3.500 10966.0 9.20
EQUIVALENT UNSHIFTED DEPTH
REMARKS:
GAMMA RAY / COLLAR LOG (MARKED LINE).
LOG TIED INTO MARKS (KB-BF DISTANCE = 36.2 FEET).
MARKED LINE G~ RAY IS THE DEPTH REFERENCE FOR
THIS WELL. MWD PREVIOUSLY RUN BY SPERRY.
NO DEPTH SHIFTS APPLIED.
ONLY A SINGLE MAIN PASS WAS LOGGED.
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GRCH
$
0.5000
START DEPTH
10199.0
STOP DEPTH
10996.0
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
$
REMARKS: MAIN PASS.
EQUIVALENT UNSHIFTED DEPTH
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: E - 23A (13-8-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GRCH GR 68 1 GAPI 4
2 MTEM GR 68 1 DEGF 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 42 556 20 0
4 42 556 20 0
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 19
Tape File Start Depth = 10199.000000
Tape File End Depth = 10996.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** ~ILE ~RAILER ****
LIS representation code decoding summary:
Rep Code: 68 4786 datums
Tape Subfile: 2 109 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10199.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
10996.0
19-JAN-94
FSYS REV. J001 VER. 1.1
1415 19-JAN-94
0.0
0.0
10200.0
11010.0
1800.0
YES
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SB
SB
SB
PCM
CCL
GR
HP
TEMP
$
SINKER BAR
SINKER BAR
SINKER BAR
PULSE CODE MODULATOR
CASING COLLAR LOC.
GAMMA RAY
HP/SIDELOADER
TEMPERATURE
TOOL NUMBER
8250EA
8248XA
8220XA
8226XA
8221XA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
0.000
12295.0
0.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
PRODUCED FLUIDS
0.00
0.0
193.3
0
0.0
0.000
0.000
0.000
0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
0.00
HOLE C~RRECTION (IN): 0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT): 0.0
BASE NORMALIZING WINDOW (FT): 0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 0
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS) : 0
TOOL STANDOFF (IN):
0.0
REMARKS: MAIN PASS.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: E- 23A (13-8-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
1 GR GR 68
2 CCL GR 68
3 TEMP GR 68
4 DTEM GR 68
5 TEN GR 68
6 SPD GR 68
1 GAPI
1
1 DEGF
1 DEGF
1 LB
1 F/MN
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 42 556 20 0
4 4 42 556 20 0
4 4 42 556 20 0
4 4 42 556 20 0
4 4 42 556 20 0
4 4 42 556 20 0
24
* DATA RECORD (TYPE# 0)
Total Data Records: 92
1014 BYTES *
Tape File Start Depth = 10189.000000
Tape File End Depth = 11013.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 23080 datums
Tape Subfile~ 3
Minimum record length:
Maximum record length:
170 records...
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
94/ 2/ 9
01
**** REEL TRAILER ****
94/ 2/ 9
01
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Wed 9 FEB 94 3:18p
Elapsed execution time = 12.41 seconds.
SYSTEM RETURN CODE = 0
Tape Subtile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
BIT RUN 1
E- 23A (13-8-11-14)
500292176301
BP EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
29 -NOV-93
BIT RUN 2
BIT RUN 3
WESLEY WESLEY WESLEY
N. SCALES N. SCALES N. SCALES
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
BIT RUN 4
WESLEY/JAHN
G. GOODRICH
BIT RUN 7
WESLEY/JAHN
G. GOODRICH
BIT RUN 5
WESLEY/JAHN
G. GOODRICH
BIT RUN 8
WESLEY/JAHN
N. SCALES
BIT RUN 6
WESLEY/JAHN
G. GOODRICH
BIT RUN 9
WESLEY/JAHN
N. SCALES
BIT RUN 10
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
lST STRING
2ND STRING
3RD STRING 8.500
PRODUCTION STRING 6.000
REMARKS: MWD - DGR/EWR/CNP
BIT RUN 11
BIT RUN 12
JAHN JAHN JAHN
N. SCALES N. SCALES G. GOODRICH
6
liN
14E
1820
501
67.95
65.20
30.20
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
13.375 2793.0
9.625 8467.0
7.000 11321.0
12300.0
ALL DEPTHS ARE MEASURED BIT DEPTHS.
FROM THE ORIGINAL E-23 HOLE, A WINDOW WAS CUT IN THE
9.625" CASING FROM 8467' MD TO 8512' MD FOR THE
PURPOSE OF A REDRILL.
REDRILL SECTION: MWD RUNS 1 THROUGH 6 WERE RUN TO TD AT
11256' WHERE THE HOLE WAS PLUGGED BACK & ABANDONED.
MWD RUNS 1 THROUGH 3 WERE DIRECTIONAL WITH DGR.
MWD RUNS 4 THROUGH 6 WERE DIRECTIONAL WITH DGR, EWR, &
CNP.
THE REDRILL SECTION WAS SIDETRACKED AT 10650' MD.
THE SIDETRACK WAS DRILLED WITH A DIRECTIONAL/GAMMA RAY
COLLAR.
MWD RUNS 7 THROUGH 9 WERE NECESSARY TO DRILL THE SIDE-
TRACK.
MWD RUNS 10 THROUGH 12 WERE SLIMHOLE GAMMA RAY WITH
DIRECTIONAL.
6" HOLE GAMMA RAY MERGED WITH 8.5" HOLE GAMMA RAY AT
11291' MD.
RESISTIVITY & NEUTRON DATA FROM APPROXIMATELY 10215' TO
10700 WAS ACQUIRED VIA A MAD PASS. THIS SECTION WAS
INITIALLY DRILLED WITH a GAMMA RAY SENSOR ONLY (MWD
RUNS 2 & 3).
NO WIRELINE DEPTH REFERENCE IS AVAILABLE FOR THIS WELL.
THEREFORE NO DEPTH SHIFTS WERE DONE.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GR
RP
NPHI
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH STOP DEPTH
8455.0 12254.0
10215.0 10650.0
10212.0 10650.0
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD 1
MWD 2
MWD 3
MWD 7
MWD 8
MWD 9
MWD 10
MWD 11
MWD 12
$
REMARKS:
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP
MERGE BASE
8400.0 9390.0
9390.0 10508.0
10508.0 10650.0
10650.0 10858.0
10858.0 10957.0
10957.0 11321.0
11321.0 11595.0
11595.0 11704.0
11704.0 12300.0
FINAL HOLE; UPPER PORTION OF REDRILL FOLLOWED BY SIDE-
TRACKED HOLE. SIDETRACKED DATA SPLICED AT 10650'.
RESISITIVITY DATA FROM 10215' TO SIDETRACK AT 10650' MD
WAS ACQUIRED VIA MAD PASS.
NEUTRON DATA FROM 10212' TO SIDETRACK AT 10650' WAS
ACQUIRED VIA MAD PASS.
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
API API API API
Log Crv Crv
Name Tool Code Samples Units Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
3 FET MWD 68 1 HR 4
4 RP MWD 68 1 OHMM 4
5 NPHI MWD 68 1 PU-S 4
6 FCNT MWD 68 1 CPS 4
7 NCNT MWD 68 1 CPS 4
4 91 948 38 6
4 99 789 97 5
4 62 202 97 6
4 54 501 47 1
4 51 877 27 0
4 84 473 18 6
4 83 817 82 6
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 249
Tape File Start Depth = 12300.000000
Tape File End Depth = 8455.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
61529 datums
Tape Subfile: 2
380 records...
Minimum record length:
Maximum record length:
62 bytes
998 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GR
RP
NPHI
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH STOP DEPTH
8455.0 11227.0
10215.0 11221.0
10212.0 11215.0
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
- EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 8400.0 9390.0
2 9390.0 10508.0
3 10508.0 10734.0
4 10734.0 10958.0
5 10958.0 11101.0
6 11101.0 11256.0
ORIGINAL REDRILL HOLE: DATA GOES FROM ORIGINAL WINDOW
IN WELL E-23 DOWN TO TD WHERE IT WAS PLUGGED BACK &
ABANDONED.
RESISITIVITY DATA FROM 10215' TO 10700' MD WAS ACQUIRED
VIA MAD PASS.
NEUTRON DATA FROM 10212 TO 10694' MD WAS ACQUIRED VIA
MAD PASS.
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
API API API API
Log Crv Crv
Name Tool Code Samples Units Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 FPHR
3 FET MWD 68 1 HR
4 RP MWD 68 1 OHMM
5 NPHI MWD 68 1 PU-S
6 FCNT MWD 68 1 CPS
7 NCNT MWD 68 1 CPS
4 91 948 38 6
4 99 789 97 5
4 62 202 97 6
4 54 501 47 1
4 51 877 27 0
4 84 473 18 6
4 83 817 82 6
28
* DATA RECORD (TYPE# 0)
Total Data Records: 184
998 BYTES *
Tape File Start Depth = 11300.000000
Tape File End Depth = 8455.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 45529 datums
Tape Subfile: 3 229 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 8370.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9356.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 1.
16-OCT-93
MWD 1.70
3.65
MEMORY
9390.0
8400.0
9390.0
0
0.0
0.0
TOOL NUMBER
P0173CG6
8.500
8467.0
BIOZAN
9.90
67.0
9.0
26000
6.0
0.000
0.000
0.000
0.000
0.0
117.0
0.0
0.0
0.00
0.000
0.0
0
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 91 948 38 6
4 4 99 789 97 5
-
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 25
Tape File Start Depth = 9391.000000
Tape File End Depth = 8370.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 67659 datums
Tape Subfile: 4 88 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9355.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10473.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 2.
18-OCT-93
MWD 1.70
3.65
MEMORY
10508.0
9390.0
10508.0
0
0.0
0.0
TOOL NUMBER
P0173CG6
8.500
8467.0
BIOZAN
9.80
66.0
9.5
25000
5.6
0.000
0.000
0.000
0.000
0.0
128.0
0.0
0.0
0.00
0.000
0.0
0
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAP I 4
2 ROP MWD 68 1 FPHR 4
4 91 948 38 6
4 99 789 97 5
-
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 28
Tape File Start Depth = 10509.000000
Tape File End Depth = 9355.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
52457 datums
Tape Subfile: 5
91 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10432.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10657.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE COP~ECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 3.
19-OCT-93
MWD 1.70
3.65
MEMORY
10734.0
10508.0
10734.0
0
0.0
0.0
TOOL NUMBER
P0173CG6
8.500
8467.0
BIOZAN
10.00
65.0
9.5
21500
6.2
0.000
0.000
0.000
0.000
0.0
130.0
0.0
0.0
0.00
0.000
0.0
0
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 8
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 91 948 38 6
4 99 789 97 5
Tape File Start Depth = 10735.000000
Tape File End Depth = 10432.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 69481 datums
Tape Subfile: 6 71 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10706.0 10929.0
EWR 10700.0 10924.0
CNP 10694.0 10917.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
20-OCT-93
MWD 1.70
3.65
MEMORY
10958.0
10734.0
10958.0
0
0.0
0.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CNP COMPENSATED NEUTRON
EWR ELECTROMAG. RESIS.
DGR DUAL GAMMA RAY
$
TOOL NUMBER
P0178CNRG6
P0178CNRG6
P0178CNRG6
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
8.500
8467.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOZAN
9.90
63.0
9.5
21000
6.4
0.200
0.140
0.130
0.340
111.0
166.0
111.0
111.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
SANDSTONE
0.00
0.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 4.
$
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
0.0
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 FPHR
3 FET MWD 68 1 HR
4 RP MWD 68 1 OHMM
5 NPHI MWD 68 1 PU-S
6 FCNT MWD 68 1 CPS
7 NCNT MWD 68 1 CPS
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 91 948 38 6
4 99 789 97 5
4 62 202 97 6
4 54 501 47 1
4 51 877 27 0
4 84 473 18 6
4 83 817 82 6
28
* DATA RECORD (TYPE# 0)
Total Data Records: 18
998 BYTES *
Tape File Start Depth = 10959.000000
Tape File End Depth = 10694.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
56706 datums
Tape Subfile: 7
85 records...
Minimum record length:
Maximum record length:
62 bytes
998 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 5
DEPTH INCREMENT: 0.5000
FILE S %q4MARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10930.0 11072 . 0
EWR 10924 . 0 11065.0
CNP 10917.0 11059.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
21-OCT-93
MWD 1.70
3.65
MEMORY
11101.0
10958.0
11101.0
0
0.0
0.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CNP COMPENSATED NEUTRON
EWR ELECTROMAG. RESIS.
DGR DUAL GAMMA RAY
$
TOOL NUMBER
P0178CNRG6
P0178CNRG6
P0178CNRG6
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
8.500
8467.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOZAN
9.80
61.0
9.0
21500
6.7
0.080
0.050
0.130
0.110
112.0
167.0
112.0
112.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
SANDSTONE
0.00
0.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 5.
$
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
0.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
3 FET MWD 68 1 HR 4
4 RP MWD 68 1 OHMM 4
5 NPHI MWD 68 1 PU-S 4
6 FCNT MWD 68 1 CPS 4
7 NCNT MWD 68 1 CPS 4
4 91 948 38 6
4 99 789 97 5
4 62 202 97 6
4 54 501 47 1
4 51 877 27 0
4 84 473 18 6
4 83 817 82 6
28
* DATA RECORD (TYPE~ 0) 998 BYTES *
Total Data Records: 12
Tape File Start Depth = 11100.000000
Tape File End Depth = 10917.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
72418 datums
Tape Subfile: 8
79 records...
Minimum record length:
Maximum record length:
62 bytes
998 bytes
Tape Subfile 9 is type: LIS
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 6
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11076.0
EWR 11070.0
CNP 11066.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11227.0
11221.0
11215.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CNP COMPENSATED NEUTRON
EWR ELECTROMAG. RESIS.
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHM}4) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
22-OCT-93
MWD 1.70
3.65
MEMORY
11256.0
11101.0
11256.0
0
0.0
0.0
TOOL NUMBER
P0178CNRG6
P0178CNRG6
P0178CNRG6
8.500
8467.0
BIOZAN
9.95
69.0
9.0
19500
8.0
0.080
0.060
0.130
0. 110
112.0
152.0
112.0
112.0
SANDSTONE
O.00
0.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
0.0
2
REMARKS: MWD RUN 6.
$
THIS IS TD FOR ABANDONED REDRILL SECTION.
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 FPHR
3 FET MWD 68 1 HR
4 RP MWD 68 1 OHMM
5 NPHI MWD 68 1 PU-S
6 FCNT MWD 68 1 CPS
7 NCNT MWD 68 1 CPS
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 91 948 38 6
4 99 789 97 5
4 62 202 97 6
4 54 501 47 1
4 51 877 27 0
4 84 473 18 6
4 83 817 82 6
28
* DATA RECORD (TYPE# 0)
Total Data Records: 13
998 BYTES *
Tape File Start Depth = 11256.000000
Tape File End Depth = 11066.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
59755 datums
Tape Subfile: 9
80 records...
Minimum record length:
Maximum record length:
62 bytes
998 bytes
Tape Subfile 10 is type: LIS
FILE HEADER
FILE NUMBER: 9
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 7
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10151.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMITM ANGLE:
STOP DEPTH
10828.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
25-OCT-93
MWD 1.70
3.65
MEMORY
10858.0
10580.0
10858.0
0
0.0
0.0
TOOL NUMBER
P0173CG6
8.500
8467.0
BIOZAN
9.90
68.0
11.5
20000
8.0
0.000 0.0
0.000 138.0
0.000 0.0
0.000 0.0
0.00
0.000
0.0
0
REMARKS: MWD RUN 7. THIS IS THE START OF THE SIDETRACK OFF OF
THE REDRILL.
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 91 948 38 6
4 99 789 97 5
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 17
Tape File Start Depth = 10858.000000
Tape File End Depth = 10151.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 76664 datums
Tape Subfile: 10 81 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 11 is type: LIS
FILE HEADER
FILE NUMBER: 10
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 8
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10826.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMI/M ANGLE:
STOP DEPTH
10923.0
26-OCT-93
MWD 1.70
3.65
MEMORY
10957.0
10858.0
10957.0
0
0.0
0.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
TOOL NUMBER
P0163CG6
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
8.500
8467.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOZAN
10.05
75.0
10.5
20000
6.0
0.000
0.000
0.000
0.000
0.0
143.0
0.0
0.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE COP~RECTION (IN):
0.00
0.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
0.0
0
REMARKS: MWD RUN 8.
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 91 948 38 6
4 99 789 97 5
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 4
Tape File Start Depth = 10957.000000
Tape File End Depth = 10826.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 60545 datums
Tape Subfile: 11 67 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 12 is type: LIS
FILE HEADER
FILE NUMBER: 11
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 9
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10922.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11291.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 9.
28-OCT-93
MWD 1.70
3.65
MEMORY
11321.0
10957.0
11321.0
0
0.0
0.0
TOOL NUMBER
P0163CG6
8.500
8467.0
BIOZAN
10.20
78.0
10.0
20000
5.6
0.000
0.000
0.000
0.000
0.0
142.0
0.0
0.0
0.00
0.000
0.0
0
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 91 948 38 6
4 99 789 97 5
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 9
Tape File Start Depth = 11291.000000
Tape File End Depth = 10922.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
78882 datums
Tape Subfile: 12
72 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 13 is type: LIS
FILE HEADER
FILE NUMBER: 12
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 10
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11321.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11595.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 10.
01-NOV-93
MWD 1.70
3.65
MEMORY
11595.0
11321.0
11595.0
0
0.0
0.0
TOOL NUMBER
NGP5.74-128
6.000
11321.0
FLOPRO
9.00
43.0
8.8
43000
6.5
0.000
0.000
0.000
0.000
0.0
129.0
0.0
0.0
0.00
0.000
0.0
0
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 91 948 38 6
4 99 789 97 5
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 7
Tape File Start Depth = 11595.000000
Tape File End Depth = 11321.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
62193 datums
Tape Subfile: 13
70 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 14 is type: LIS
FILE HEADER
FILE NUMBER: 13
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 11
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11595.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMTJM ANGLE:
STOP DEPTH
11704.0
03-NOV-93
MWD 1.70
3.65
MEMORY
11704.0
11595.0
11704.0
0
0.0
0.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
TOOL NUMBER
NGP5.74-128
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
6.000
11321.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLOPRO
9.20
43.0
9.5
43000
6.5
0.000
0.000
0.000
0.000
0.0
125.0
0.0
0.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
0.00
0.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
0.0
0
REMARKS: MWD RUN 11.
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 3
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 91 948 38 6
4 99 789 97 5
Tape File Start Depth = 11704.000000
Tape File End Depth = 11595.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
79540 datums
Tape Subfile: 14
66 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
0'0
0'0
0 '9~I
0'0
0
0'0
000 '0
00 '0
000 '0
000 '0
000 '0
000 '0
0'9
000~'~,
§'6
0 'I9
0[:'6
OHcIO~
0
000 '9
8~I-~£'~0~
H~SWYI~ ~OO&
0'0
0'0
0
0'00~I
0'~0LII
0'00~I
~HON~N
§9'£
0L'I QMH
£6-AON-~0
· EI NY1H QMH :
: (ZH) KDNHFIO,~H~I HM,~
: (N~) ~,~OGN-~$ ~OOZ
:(A~) HAdHG DNISWD S,HHqqIHG
:(NI) HZIS AI8 H%OH NH60
¥~¥G DNISWD gN~f H%OHHHO~
.~aX,L ~O0,L gGOD ~OOJ, HO~N.~A
(~O,L,LO~ O,L aO,L) DNIH,LS ~O0,L
0'~EEI
'saII~ a$~a~das uIuna $Iq Uo~ ao~ ~$~p aap~aq BoI pu~
H2G~S~H ~%I~
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 15
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 91 948 38 6
4 99 789 97 5
Tape File Start Depth = 12300.000000
Tape File End Depth = 11704.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 65773 datums
Tape Subfile: 15 78 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 16 is type: LIS
FILE HEADER
FILE NUMBER: 15
RAW MAD
Curves and log header data for each pass of each run in separate files.
MAD RUN NUMBER: 1
MAD PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10221.0
EWR 10215.0
CNP 10212.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10705.0
10699.0
10692.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CNP COMPENSATED NEUTRON
EWR ELECTROMAG. RESIS.
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
MWD 1.70
3.65
MEMORY
10705.0
10212.0
10705.0
0
0.0
0.0
TOOL NUMBER
P0178CNRG6
P0178CNRG6
P0178CNRG6
8.500
8467.0
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.000
0.0
0.0
0.0
0.0
SANDSTONE
0.00
0.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
0.0
2
REMARKS:
MAD PASS 1. EWR & CNP DATA USED IN EDITED FILES.
NO HEADING INFORMATION AVAILABLE FOR THIS PASS.
$
CN : BP EXPLORATION
WN : E - 23A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 FPHR
3 FET MWD 68 1 HR
4 RP MWD 68 1 OHMM
5 NPHI MWD 68 1 PU-S
6 FCNT MWD 68 1 CPS
7 NCNT MWD 68 1 CPS
4 4 91 948 38 6
4 4 99 789 97 5
4 4 62 202 97 6
4 4 54 501 47 1
4 4 51 877 27 0
4 4 84 473 18 6
4 4 83 817 82 6
28
* DATA RECORD (TYPE~ 0) 998 BYTES *
Total Data Records: 34
Tape File Start Depth = 10735.000000
Tape File End Depth = 10212.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
87917 datums
Tape Subfile: 16
103 records...
Minimum record length:
Maximum record length:
62 bytes
998 bytes
Tape Subfile 17 is type: LIS
93/11/29
01
**** REEL TRAILER ****
93/11/30
01
Tape Subfile: 17 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Tue 30 NOV 93 10:58a
Elapsed execution time = 43.61 seconds.
SYSTEM RETURN CODE = 0