Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout193-164THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03,2001 .... E PL W M ATE IA L U N D Ei~ TH IS M ARK ER State of Alaska · · . REP,,:0RT .ALASKA OIL & GAS CONSERVATION C0~MISSZON Operator Note cas~g s~e, wt, ~e~, mt vol, ia~e~za!s - tops: ,, , Review the well file, and-c_,~-,-,ent, on plugging, well head status, and location ~earance - pro. vide loc. clea~, co~e. _ Well head cut off: -. i i Code Signed Date STATE O. R EC RIVED ALASKA OIL AND GAS CONSERVATION COM MISSION Plugback for Sidetrack WELL COMPLETION OR RECOMPLETION REPORT AND L~ 0 ~- ~998 1. Status of Well Classificatil~a~~61tns. CommisslOI r--I Oil [-I Gas [] Suspended [~]Abandoned l--I Service Water Injection Anchorage 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 93-164 398-007 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22413 4. Location of well at surface 699' NSL, 1258' NWL, SEC. 32, T12N, R13E, UM ~ ~ 9. UnitprudhoeOr LeaSeBay UnitName At top of productive interval ~ ,,P~.~E~'r,~.;. ~ 10. Well Number 3443' SNL, 2579' NWL, SEC. 33, T12N, R13E, UM i~ R-32i At total depth ~.~,~/ L AV~D~ 11. Field and Pool ~) 3488' NSL, 2698'-~/;~L, SEC. 33, T12N, R13E, UM - ~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) ! 6. Lease Designation and Serial No. Pool KBE = 53.5'I ADL 028278 '12. Date Spudded 113. Date I.D. Reached I 14. Date Comp., Susp., or Aband.115. Water depth, if offshore 116. No. of CompletionS ~, 11/18/93 12/3/93 1/12/98 N/A, MSLI ................ Zero 17. To{'a, De~th (MD+TVD) 118. P,ug Back Depth (MD+~D)I19. Directional Survey 120. Depth where SSSV set 121. Thickness of P~rmafrost" 12135 9237 FTI 12059 9168 FTI I--lYes [~NoI N/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run DIL / SONIC / GR / CNL / MWD 23. CASING~ LINER AND CEMENTING RECORD CASING SEI-FING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOll'OM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# .. H-40 32' 110' 30" 260 sx Arctic Set (Approx.) . . ...... '1'3-3/8" 68# NT-80' 3~' 3340' 16" 1270 Sx Coldset III, 375 sx Class 'G' 9-5/8" 47# L-80 32' 11674' 12-1/4" 1100 sx Class 'G' 7" 26# L-80 11521' 12135' 8-1/2" 170 sx Class 'G' , , ,,,, ,,, ,,, 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) None 5'1/2", L-80 11529' 11464' MD TVD MD TVD .................... 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11749' P&A, 20 Bbls Class 'G', Sqzd at 1000 psi 11700' Top of Whipstock iq'D I lkl A "1"' 27. PRODUCTION TEST U I \ I ~ I i ~ r-~ L., D,~:t'e First 'Production ......... I Method of OPeration (FloWing, gas lift, etc.) .... Not on ProductionI N/A I~ate of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALcuLATED OIL-BBL GAS-MCF WATER-BBL OIL GRAViTY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA ....... , ........ Brief description of lithology, poro"sity, fractures, apparent dips and presence of oil, gas or water, submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate ~' Geologic Markers 30. Formation Tests ,,, Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. ,, ,, , Subsea Sag River 11697' 8782' Shublik 11745' 8826' Top of Sadlerochit 11822' 8897' 31. List of Attachments Summary of Daily Drilling Reports ........ 32. I hereby ~~e foreg°i~'~ is true and c°rrect t° the best'''°f my kn°wledge---~ ~/~. O/~' Signed ~~.~ -- ~ , Title Senior Drilling Engineer Date .......... ~R-32i 93-164 398-007 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No, / Approval No, ............. INSTRUCTIONS GENERAL-' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24.' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 R-32 PRE-SIDETRACK CEMENT PLUG 01/12/98 A Cement Plugback was performed on the interval using the following fluids: SUMMARY Move in rig up DS CTU #2. Blow out preventer test. Rig up and test surface lines. Pick up bottom hole assembly #1 (CS fishing assembly). Run in hole. Latch XN plug at 11514', pulled out of hole. Recovered fish and lay down. Pick up jetting nozzle. Run in hole, pump 578 bbls seawater to kill well. Reciprocate and jet with 33 bbls diesel/Xylene mix followed by seawater from 11688' to 12054'. Tag TD at 12054'. Pump mud and Diesel/Xylene mix into perforations. Pull out of hole. Freeze protect coil and backside. Pick up cementing nozzle. Run in hole with cementing nozzle. Pump 20 bbls. Class 'G' cement from TD at 12,050' to tubing, tail at 11,528'. Apply 1000 psi squeeze pressure. Approx. one bbl squeezed. Jet contaminated cement with biozan down to 11,743'. circulate contaminated out the long way while holding positive pressure on squeeze. Pulled out of hole. Freeze protect tubing to 2000' with diesel. PT squeeze to 1000 psig for 5 min. - good. Left well shut in with 400 psi on well. Rig down DS #2. FLUIDS PUMPED BBLS DESCRIPTION 155 Methonal 1136 Seawater 30 Biozan 33 50/50 Diesel/Xylene 25 Fresh water 50 Diesel 20 Class '(3' cement 1449 Total Bbls Pumped Facility PB R Pad Progress Report Well R-32A Page 1 Rig Doyon 16 Date 02 April 98 Date/Time 06 Feb 98 07 Feb 98 08 Feb 98 09 Feb 98 10 Feb 98 11 Feb 98 12 Feb 98 14:01-15:30 15:30-16:30 16:30-18:00 18:00-20:00 20:00-23:30 23:30-01:00 01:00-02:30 02:30-03:30 03:30-06:00 06:00-09:00 09:00-14:00 14:00-15:00 15:00-17:00 17:00-20:30 20:30-22:00 22:00-00:00 00:00-02:00 02:00-05:00 05:00-06:00 06:00-07:00 07:00-08:00 08:00-11:00 11:00-18:00 18:00-18:30 18:30-22:00 22:00-23:00 23:00-01:30 01:30-05:00 05:00-06:00 06:00-08:30 08:30-09:30 09:30-16:00 16:00-16:30 16:30-17:30 17:30-20:30 20:30-01:00 01:00-01:45 01:45-05:00 05:00-06:00 06:00-06:30 06:30-07:30 07:30-12:00 12:00-14:00 14:00-21:30 21:30-22:00 22:00-04:00 04:00-06:00 06:00-10:00 10:00-10:30 10:30-16:00 16:00-23:30 23:30-01:00 O1:00-06:00 06:00-06:15 Duration 1-1/4 hr 1 hr 1-1/2 hr 2 hr 3-1/2 hr 1-1/2 hr 1-1/2 hr 1 hr 2-1/2 hr 3 hr 5 hr 1 hr 2 hr 3-1/2 hr 1-1/2 hr 2 hr 2 hr 3 hr 1 hr 1 hr 1 hr 3 hr 7 hr 1/2 hr 3-1/2 hr 1 hr 2-1/2 hr 3-1/2 hr 1 hr 2-1/2 hr 1 hr 6-1/2 hr 1/2 hr 1 hr 3 hr 4-1/2 hr 3/4 hr 3-1/4 hr 1 hr 1/2 hr 1 hr 4-1/2 hr 2 hr 7-1/2 hr 1/2 hr 6 hr 2 hr 4 hr 1/2 hr 5-1/2 hr 7-1/2 hr 1-1/2 hr 5 hr 1/4 hr Activity Rig moved 10.00 % Rig moved 40.00 % Installed BOP stack Rig moved 100.00 % Fill pits with Seawater Removed Hanger plug Installed Hanger plug Removed Xmas tree Installed BOP stack Rigged up BOP stack Tested BOP stack Removed Bell nipple Rigged down Kelly Removed Hanger plug Installed Hanger plug Removed BOP stack Rigged up Kelly Installed BOP stack Removed Hanger plug Installed Bell nipple Installed Wear bushing Installed Undereamer Ran HWDP to 6000.0 ft (2-7/8in OD) Held safety meeting Ran Drillpipe to 9000.0 ft (2-7/8in OD) Rigged up Kelly Tested Kelly , Ran Drillpipe to 11739.0 ft (2-7/8in OD) Functioned Undereamer Functioned Undereamer Circulated at 11749.0 ft Pulled Drillpipe in stands to 662.0 ft Held drill (Kick (well kill)) Pulled Drillpipe in stands to 0.0 ft Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Rigged up sub-surface equipment - Downhole tools Held safety meeting Rigged up sub-surface equipment - Mud motor Ran Drillpipe in stands to 11508.0 ft Worked toolstring at 11508.0 ft Pulled Drillpipe in stands to 0.0 ft Rigged up sub-surface equipment - Downhole tools Ran Drillpipe in stands to 11508.0 ft Functioned Downhole tools Functioned Downhole tools Ran Drillpipe in stands to 11692.0 ft Functioned Mud motor Pulled Drillpipe in stands to 0.0 ft Installed Mud motor Ran Drillpipe in stands to 11600.0 ft Ran Drillpipe in stands to 11665.0 ft (cont...) Progress Report Facility PB R Pad Well R-32A Rig Doyon 16 Page 2 Date 02 April 98 Date/Time 13 Feb 98 14 Feb 98 15 Feb 98 16 Feb 98 17 Feb 98 18 Feb 98 06:15- l 0:00 10:00-23:30 23:30-01:00 01:00-06:00 06:00-06:15 06:15-07:30 07:30-10:30 10:30-14:30 14:30-15:30 15:30-18:00 18:00-06:00 06:00-15:00 15:00-15:30 15:30-18:00 18:00-18:30 18:30-21:00 21:00-23:00 23:00-23:30 23:30-23:45 23:45-03:30 03:30-04:00 04:00-06:00 06:00-06:30 06:30-07:30 07:30-11:00 11:00-17:00 17:00-18:30 18:30-19:30 19:30-01:00 01:00-02:30 02:30-03:30 03:30-05:00 05:00-06:00 06:00-06:30 06:30-11:00 11:00-11:30 11:30-12:30 12:30-00:30 00:30-01:30 01:30-06:00 06:00-06:30 06:30-07:00 07:00-08:00 08:00-09:00 09:00-09:30 09:30-15:00 15:00-16:00 16:00-17:30 17:30-18:00 18:00-18:30 18:30-06:00 06:00-07:30 07:30- ! 3:00 13:00-14:00 Duration 3-3/4 hr 13-1/2 hr 1-1/2 hr 5 hr 1/4 hr 1-1/4 hr 3 hr 4 hr 1 hr 2-1/2 hr 12 hr 9 hr 1/2 hr 2-1/2 hr 1/2 hr 2-1/2 hr 2 hr 1/2 hr 1/4 hr 3-3/4 hr 1/2 hr 2 hr 1/2 hr 1 hr 3-1/2 hr 6 hr 1-1/2 hr 1 hr 5-1/2 hr 1-1/2 hr 1 hr 1-1/2 hr 1 hr 1/2 hr 4-1/2 hr 1/2 hr 1 hr 12 hr 1 hr 4-1/2 hr 1/2 hr 1/2 hr 1 hr 1 hr 1/2 hr 5-1/2 hr 1 hr 1-1/2 hr 1/2 hr 1/2 hr 11-1/2 hr 1-1/2 hr 5-1/2 hr I hr Activity Functioned Downhole tools Functioned Mud motor Circulated at 11705.0 ft Pulled Drillpipe in stands to 0.0 ft Held safety meeting Rigged down sub-surface equipment - Downhole tools Made up BHA no. 1 R.I.H. to 8700.0 ft Serviced Block line R.I.H. to 11705.0 ft Drilled to ! 1974.0 ft Drilled to 12110.0 ft Circulated at 12110.0 ft Pulled out of hole to 7460.0 ft Held safety meeting Pulled out of hole to 1031.0 ft Pulled BHA Retrieved Bore protector Installed BOP test plug assembly Tested BOP stack Installed Bore protector Made up BHA no. 2 Made up BHA no. 2 Pulled BHA Made up BHA no. 2 R.I.H. to 12110.0 ft Drilled to 12115.0 ft Circulated at 12115.0 ft Pulled out of hole to 748.0 ft Pulled BHA Serviced Drillfloor / Derrick Made up BHA no. 3 R.I.H. to 1500.0 ft Held safety meeting R.I.H. to 11680.0 ft Set tool face R.I.H. to 12115.0 ft Drilled to 12369.0 ft Circulated at 12369.0 ft Pulled out of hole to 1600.0 ft Held safety meeting Pulled out of hole to 748.0 ft Pulled BHA Made up BHA no. 4 Tested MWD - Via string R.I.H. to 11673.0 ft Serviced Block line R.I.H. to 12276.0 ft Serviced Mud pumps Reamed to 12369.0 ft Drilled to 12700.0 ft Circulated at 12700.0 ft Pulled out of hole to 900.0 ft Pulled BHA ALA~OIL AND GAS CONSERVATION COMMISSI~;~'~ REPORT SUNDRY WELL OPE, I TIONS 1. Operations performed: Operation shutdown Pull tubing Alter casing 2. Name of Operator BP Ex/)loration (Alaska) Inc. 3. Address P. O. Box 196612, Anchoraoe, Alaska 99519-6612 4. Location of well at surface 699' NSL, 1258' EWL, SEC. 32, T12N, R13E At top of productive interval 3443' SNL, 2579' EWL, SEC. 33, T12N, R13E At effective depth N/A - Water Injector At total depth 3488' NSL, 2698' WEL, SEC. 33, T12N, R13E Stimulate )~ Plugging Perforate Repair well Other 5. Type of Well: Development Exploratory Stratigraphic Sewice.~ 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural .. Conductor 110' Surface 3286' Intermediate 11620' Production ._ Liner 614 Perforation depth: measured 12135 9237 12059 9168 Size feet Plugs (measured) feet feet Junk (measured) feet Cemented 20" 13 3/8" 9 5/8" 260 sx Arcticset(Approx) 1270/375 c.f. ASIII "G" 1100 sx Class "G" Measured depth 165 334O 11674 7" 160 sx Class "G" 11521-12135 111696'-11744', 11822'-11912' (6spf) true vertica~ubsea 8836'-8880', 8952'-9034' 6. Datum elevation (DF or KB) KBE=~3.5 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number R-32i(22-33-12-13) 9. Permit number/approval number 93-164 / 10. APl number 50.029-22413 11. Field/Pool Prudhoe Oil Pool Tubing (size, grade, and measured depth)5-1/2",L-80 @ 11529' MD True vertical depth BKB 165 3000 8851 8711-9272 ORIGINAL Packers and SSSV (type and measured depth)Packer @ 11464', SSSV @ 2134' RECEIVED 13. Stimulation or cement squeeze summar3See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure Alaska Oil & (]as Cons. Commission Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Dat~ OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 12000 11000 Tubing Pressure 3300 3200 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil Gas Suspended 17. I ~ th,,ayhe for~ing/7 ,/ is true and ~,~r~ct to the best of my knowledge. t' -- Form 10-404 )6/15188 / Service w~ter ini. ector SUBMIT IN DUPLICATE R-32 DESCRIPTION OF WORK COMPLETED Stimulation Operation 09/11/97 A_Tubing Wash was performed using the following fluids: SUMMARY Bullheaded caustic dipersant via meoh manifold. Shutdown and let soak for 3 hours. Displaced with produced water at 1 bpm. Shutdown and soaked for 3 hours. Put well on injection. I Fluids Pumped BBLS. Description 252 Produced Water 303 Dispersant 10 Meoh 565 TOTAL L STATE OF ALASKA ALAS AND GAS CONSERVATION C ISSION APPLICATION FOR SUNDRY APPROVAL · Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 699' NSL, 1258' EWL, SEC. 32, T12N, R13E, UM At top of productive interval 3443' SNL, 2579' EWL, SEC. 33, T12N, R13E, UM At effective depth N/A - Water Injector At total depth 3488' NSL, 2698' WEL, SEC. 33, T12N, R13E, UM Type of well: J--J Development I--] Exploratory J--J Stratigraphic J~]Service 12. Present well condition summary 6. Datum Elevation (DF or KB) KBE = 53.5' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number R-32i 9. Permit Number 93-164 10. APl Number 50-029-22413 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay oo, RECF. i¥ Di Total depth: measured 12135 feet true vertical 9237 feet Effective depth: measured 12059 feet true vertical 9168 feet Casing Length Size Structural Conductor 110' 20" Surface 3286' 13-3/8" Intermediate 11620' 9-5/8" Production Liner 614' 7" Plugs (measured) Junk (measured) Cemented 260 sx Arcticset (Approx.) 1270 sx CS III, 375 sx Class 'G' 1100 sx Class 'G' 160 sx Class 'G' JAN-9 1998 Naska Oil & Gas Cons. Commiss MD Anch°ra~D 165' 165' 3340' 2966' 11674' 8817' 11521'-12135' 8677'-9239' Perforation depth: measured true vertical 111696'-11744', 11822'-11912' subsea 8836'-8880', 8952'-9034' Tubing (size, grade, and measured depth) 5-1/2", L-80 at 11529' Packers and SSSV (type and measured depth) packer at 11464'; SSSV at 2134' 13. Attachments J~] Description summary of proposal i--J Detailed operations program J--J BOP sketch 14. Estimated date for commencing operation January 14, 1997 16. If proposal was verbally approved Name of approver Date approved Contact Engineer Name/Number: Chris Brown, 564-5582 15. Status of well classifications as: J--J Oil J--I Gas l--J Suspended Service Water Injection Prepared By Name/Number: Terrie Hubble, 564-4628 17.1 hereby certif~ that thefor/e)going is true and correct to the best of my knowledge Signed(J'.~::~ Dan "'""(/""--- /'~"~ /],¢~ 3"/~ LT'~ Title Senior Drilling Engineer Commission Use Only Date FO~/9(:~' J Approval No,,~'_/4:~ Conditions.,of~val: Notify Commission so representative may witness ,,,,,ot, Ogeg_~",~' - Plug integrity ~" BOP Test u," Location clearance rw'r~.ettb-~~ "~"'" Mechanical Integrity Test Subsequent form required 10- ~0 '~ ~ U~-i~inal Signed By Approved by order of the Commission David W. Johnston Commissioner Subnhit In/l'Hl~licate~ Form 10-403 Rev. 06/15/88 ;in R-32i P&A SUMMAR Objective The objective of the pre-rig work is to ensure tubing and casing integrity for the rig TTRD procedure, P&A the existing perforations, set a whipstock, mill a casing window, and freeze protect the well in preparation for a Through Tubing Rotary Drilling Horizontal Sidetrack. Critical Well Information 5-1/2", 17#, L80 Tubing 7", 26#, L80, Liner I.D. = 4.892" I.D. = 6.276" Capacity = 0.0232 bbl/ft Capacity = 0.0383 bbl/ft SSSV Landing Nipple: 2,134' MD PBTD (7"): 12,059' MD Minimum ID (4.455" I.D.): 11,514' MD Perforations: 11,696'-11,744' MD Proposed TOC: ±11,743' MD 11,822'-11,912' MD Maximum documented hole inclination is 50° at 6,348' MD. Angle at the proposed KOP inside the 7" liner (__.11,698' MD)is _24°. Notify an AOGCC representative prior to commencing P&A operations. Pre-Rig Work: NOTE: If any problems with the 9-5/8" packoff are observed during pre-rig work, contact the wellhead manufacturer to initiate repairs. If repairs are not possible, the TTRD sidetrack may be halted, and an alternative sidetrack method used. This well is an injector, and the existing perforations will be thermally fractured. This means that the perforations will likely drink most or all of a standard cement plug. For this reason, it is recommended that a 20ppb aggregate cement plug is pumped until some squeeze pressure is obtained. 1. If tubing and annulus have not recently (<1 month) been tested R/U wireline and retrieve SSSV. Set tubing plug in SWN nipple. Perform MIT on tubing and annulus to 4,000psi. Retrieve tubing plug and POOH. . R/U slickline, and drift tubing to plug back TD at 12,059' (elm) to ensure access to lower perforations. Drift tubing to SWN nipple at 11,781' with drift to ensure whipstock (3.635" OD) pass through of minimum 3.8" OD. . R/U CT unit and RIH with cementing BHA. Jet liner across the proposed cement interval in order to remove any debris (consider using "schmoo-be-gone"). Spot a balanced cement plug w/20ppb aggregate (crushed brick) from base of the well to -11,500' (open perforations from 11,696' to 11,912'), displacing with diesel against a closed choke until 1,000psi squeeze pressure is seen. Run back in hole to _+11,743', circulating out excess cement with contaminant to obtain the required TOC at _+11,743'. POOH. Let the plug set up, then tag with slickline. NOTE: If necessary to prevent loss of cement, circulate well to a diesel cushion sufficient to reduce the hydrostatic overbalance on the cement column. 4. Pick up underreamer sized for 7" 26# casing, and underream interval from 11,600' to 11,743' to ensure good casing for whipstock to set in. Tag TOC as required for AOGCC representative and POOH. NOTE: The under-reamer will be working across a perforated interval and hence care must be taken not to damage or lose any parts of the under-reamer arms R-32i Sundry P&A Proc re Page 2/2 o R/U electric line. Set Baker through tubing whipstock oriented highside with top of whipstock at 11,695' set for a kickoff to exit the casing at 11,698' (the base of the whipstock should be at approximately 11,713'). This will put the top of the whipstock 9' MD below the base of the Kingak formation which is known to be troublesome. Please have a Baker representative on site when setting the whipstock. R/D electric line. If cement plu.clback or whipstock settina r)roblems are encountered, please contact SSD Ops Drillin.q En.qineer immediately for possible alternative procedures. . M/U 4.55" OD milling assembly and RIH. Mill out SWN nipple at 11,514' to 4.55". RIH, tag whipstock/liner and mill out/dress window to 4.55". Do not mill out more formation than is needed to bury the window dressing mill. 7. Circulate kill weight fluid and freeze protect with diesel (estimated BHP at 8800'TVDSS is 3,500psi - 7.6ppg EMW) to depth of ___2,200'. 8. Set and test BPV. Remove wellhouse and flowlines, level pad, dig out cellar Summary Ri.cl Procedure 1. Prior to rig move, test 9-5/8" packoff to 5,000psi, and function lock down screws (FMC wellhead representative to do this). If any problems with the 9-5/8" packoff are observed, contact the wellhead manufacturer to initiate repairs. If repairs are not possible, the TTRD sidetrack may be halted, and an alternative sidetrack method used. 2. MIRU. Pull BPV and set/test TWCV. ND tree, NU BOP's and test same. Pull TWCV. 3. RIH with 4.5" drilling assembly (circulate out freeze protection) and tag TD of new hole. Displace well to Quikdriln drilling fluid, and drill 4.5" hole section to TD of 17,565' as per directional plan. 4. RIH with DP(:; logs and make logging run across open hole section from window to TD. 5. M/U and run 6,135' of 3-1/2" solid L80 ST-L liner to hang off depth in 7" tubing of +11,430'. Cement liner in place with inner string cementing assembly, and set liner hanger/packer. Circulate out excess cement, and displace well to clean seawater. POOH. 6. RIH with DPC CBL log and make logging pass over the liner to determine condition of cement job. POOH. 7. RIH with DPC perforating guns and perforate 50' of liner. 8. RIH with DP and circulate freeze protection to +2,200'MD. 9. Set and test TWCV, ND BOP, NU tree. Pull TWCV and set/test BPV. RDMO. Prepared by: ~ Chr',is//Brown, Doyon 16 Ops Drlg Engr (Office) 564-5582 (Home) 346-3773 (Pager) 275-1835 ACTUATOR: BAKER 13-3/8", 68#, L- i 3340~ I 80, BTC I KOP ~ 600' I Max Angle ~ 47* 1 I5-1/2", 17#, L-80, J NSCC Tbg $-1/2", 17 #/ft, L-80, TAILPIPE KB. ELEV = 32,5' GRND. ELEV = 20.3' S t/2" 8W$ NIPPLE (PARKER)( 4,562" ID) IoTF:-*THEREARE NO FLOW I COUPLING_8 ON .s.WS NIPPLE. ,,! __ Top of TIW 7' Liner Hanger [--1~$t~ i TIW 9-5/8" liner top packer NSCC PERFORATION SUMMARY REF: LOG: I SlZE I.sPF | INTERVAL 33/8 6 11,822-11,912 ,,,, 7", 26 #Iff, L-SO, N$CC PBTD 'OPEN OPEN 5-1/2' "SWS" NIPPLE (4.$8~' ID). 9-518 x 5-112" PACKER TiW HBBP HYDRO-SET 5-1/2" "8W8" NIPPLE (PARKER) (4.562" ID) DATE 12/08/93 COMMENTS POST COMPLETION __.-1/2"'$WN"NtPPLE I i I ';~" (Parl(er) (4,465" ID) 16i4" · 'i' .~ .'-' . -,~ ...;~'i;',' · .:,. ,.*, ' .' · . ~'., ', ..~.,".',, ,;~,~.{;'., 'F', · .".":.'. i ., i~.!.~:..';~:.l{i~ ,.~'!.' ' ...... ~,,,~. <..,~_ ,,, ,t~ ..... ., · , ' .. 7"x41/2'P~oker I ' 1178g " ' BAKER FB-1 (3.958" .", .... 14D-)1/2" 8W$ Nipple : .... ' PARKER ~ "" "' "" '~'' 4-1/2' SWN Nipple , PARKER I 11781 , :.,...~ .,~.,.~,.:... 4-1/2" Wleg j 11785 ,,:. i!.,.h...~i,..:~ ,..:,.~ . ~.: ~.:;.~.:,...:; .,,. .,!. ::.:,:,: ?[~!!i,,!~i{:,~i!;!!!.;.!7. .. ipRUDHOE BAy UNIT WELL: R-32 (22-33-~12-13.1 APl NO: 50-029- 22413 i iii IBP/ARCO PBU, DRILLING 13'3/8"' 68~'I 3340 L-80. BTC , Max Angle 0 47* i $-1/2", 17#, L-80, I NSCC Tbg I $-1/2" x 3-1/2" Liner hanger/packer $-1/2", 17 it/fl, L-80, TAILPIPE Top of TIW , 7" Liner Hanger I 11s21 I TIW 9-5/8' liner top packer 9-5/8". 47# L-80 I 11674 NSCC Whipetook top 11,695' (Idok off at 11,698') Squeezed perforations 11,696'- I 1,744' 11.822'-11,912' PBTD 26 #/fl, L-80, N$CO DATE I REV. BY 12/08/93 I' SJA 12/13197 ] CJB Cement plug top al 11,743' 12O59 I - POST COMPLETION PROPOSED COMPLETION · 5 1/2" SW$ NIPPLE (PARKER)( 4.562" ID) INOTE: THERE ARE NO FLoW l C~,UPUNG$ ON 8W8 NIPPLE,J 5-1/2" "SWS" NIPPLE (PARKER) (4,~2" ID) S-~/8 x ~-1/2" PACKER TIW HBBP HYDRO,SET 6-1/2" "$W$" NIPPLE (PARKER) (4.$~' ~D) 6-1/2" "SWN" NIPPLE (Parker) (Mi,ed outto 4.55" mD) 5-1/2" WLEG 3-1/2', g.6#, LBO, ST-L 4-1/E" 'ID at 17,665' 7" x 4 1/2" Paoker '-'-' BAKER F.-I (3.958' [11769 ] PARKER 4.1/2' SWN -- [ Mpple 11781 PARKER ~ 4-1/2" [ Wleg 11785 I-PRUDHOE BAY UNIT INELL: R-32 (22-33-12.13) APl NO: 50~,029. 224.1II- IBP/ARco PBU DRILLING!m f.. .' : .,. ?..,'!!ll)l!a.'~::!..:' ,' '"'~,. ~E"',~ ' ' ' . . ..'.' ~l.'. *'.,,,.' · · ~! !ii:;',: !~ ;: · ' ~,::1' .:i':: ' · · :" ¥' "~:'i :':: ' · "1 '. '' i. :.::.? . ' ,:k'":.'""'" ' i~:~:. :. ' .. · ?,.. I~.., · J~,. ;. i~.,i ·.. ii: '~': ',:,!.. i: .".': ': "":':'"' · ';; i' · · · ' ' ' ' :::,i,~':.~; ,' ' · ," ".:.¢;;;.ii',":'. ':. · .., ,'.: .',.',,,.= v,'~', :v: ,.. '; ": :;~,i~i~¥,:;:',, , .' ;..' ,. ~., ..... ;j~,~,.-...:.. ...... .::;.:~.~.,~ ;.. : ,.. :' :. ,". ,:, '.' ? ~/!~i':' i,~!.,:,.:,:,. ...... ., ;,, ::;:,~j~' ?' '. ,., ~.... ,: ' . '..F hi~.'.?.!'.: ' ·. ' · .';'i:,~,~Jii ~..'.i,.'.." ' '.:'..': .' i.~?iil;~:;!'.:::..: '.' '. '.,", .'"'i' ', '.. ,..i .... l~ ','fi;;'i"i :'.:. .;; . .: .,",.;! ,!tir,..':lIF.:..., i .;,: '...,": ':','.:~ ~.¢~': ~'~;i :).: ':"' ' ,. : , ;.: . .:,.,.: ::~, !: ..:'. ", '. ' ' ': '; ..'?.i;~'¥L, :, '.' ' ' 1.' ', ". · ' :~. ' ~.'l :;'~ ." '." : ...:. "' '!l: ~:;~:: ' ?.', · . ' . '¥::i)."? ~'. · '! ' ' ' ' ;."l','~(f .: ,'f" " ',' . 'r'~', ;~.' ,, .:' ",' '. : L.,:'K"" ., ~ AOGCC Individual Well ~ Geological Materials Inventory Page: Date: 10/13/95 PERMIT DATA T DATA_PLUS RUN DATE_RECVD 93-164 5946 93-164 407 93-164 DAILY WELL OP. 93-164 SURVEY 93-164 CNL/GR ~~11650-12074, OH/LDWG ~/CCOMP DATE: 01 / 17 / 94 ~~11/18-12/08/93 ~0-11689, SPERRY SUN ~650-12130 1 01/05/94 01/25/94 01/25/94 01/25/94 1 01/05/94 93-164 DIL/FL/GR 93-164 GR/CCL 93-164 GR/CCL (PSR) 93-164 INJ 93-164 93-164 PFC/GR/CCL 93-164 PLS (INJP) 93-164 SBT/GR/CCL .-~11650-12130 ~650-12020 ~'~1520-11960 -~~600-12025 PFC/CCL (PERF) ~'/11800-12031 ~11640-11740 ~/11570-12020 ,~1460-12058 1 01/05/94 1 06/26/95 1 12/20/93 1 10/12/94 1 02/22/94 1 02/04/94 1 05/10/94 1 12/20/93 Are dry ditch samples required? yes ~d received?--~o Was the well cored? yes ~.4~alysis & description ~-~=cclvc~? -~yes no Are well tests required? yes ~ived? y~ ~u Well is in compliance '.~ Initial COMMENTS LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 19 June 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: · D-17 (14-23-11-13) ...... 1 PFC/PERF FINAL BL+RF Run # 1 X-24 ECC No. 6036.06 6106.07 6445.01 Please sign a~--z~t~rrn~..-_ Attn. Rodney D. Paulson ~ "Atlas Wireline Services 5600'.. S Street ~~ ~-201 ~ Anchor~e, AK 99518 J~ ~r FAX to (907) 563-7803 Received~~~4_ / /~~~/ =_ Date: · i ' STATE OF ALASKA I, ~IL AND GAS CONSERVATION COMMI~ REPOR¥b ' SUNDRY WELL OP'E:- TIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. Stimulate x Plugging Alter casing 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Repair well 5. Type of Well: Development Exploratory Stratigraphic Sewice Perforate Other 6. Datum elevation (DF or KB) KBE=53.5 feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 699' NSL, 1258' EWL, SEC. 32, T12N, R13E At top of productive interval 3443' SNL, 2579' EWL, SEC. 33, T12N, R13E At effective depth N/A - Water Injector At total depth 3488' NSL, 2698' WEL, SEC. 33, T12N, R13E 8. Well number R-32i(22-33-12-13) 9. Permit number/approval number 93-164 / 10. APl number 50- 029-22413 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing - Structural Conductor Surface.. Intermediate Production Liner Perforation depth: measured true vertical Length .. 12135 feet 9237 feet 12059 feet 9168 feet Plugs (measured) Junk (measured) Size Cemented 110' 3286' 11620' .. 614 measured 20~ '3 3/8" 9 5/8" 260 sx Arcticset(Approx) 1270/375 c.f. ASIII "G" 1100 sx C/ass "G" 7" 160 sx Class "G" 111696'-11744', 11822'-11912' (6spf) true vertical subsea 8836'-8880', 8952'-9034' Tubing (size, grade, and measured depth) 5-1/2",L-80 @ 11529'MD ' : Packem and SSSV (~pe and measured depth) Packer @ 11464', SSSV @ 2134' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure Measured depth True vertical depth BKB 165 165 3340 2966 11674 8817 11521-12135 8677-9239 RECEIVED ,IY~ -7 1995 N~st~ u~l & Gas Cons. Commission Ancflon' ;~ 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injectior~ Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 12000 11000 Tubing Pressure 3300 3200 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service water iniector 17. I hereby cprtify that the foregoij3~l is true and correct to the best of my knowledge. Signed ~__V ~f/3~~~ "~/j~-~ _ ~/~~ Title Senior Techn/calAssistantll Form 10-40,~ Fiev 06/15/88- Date SUBMIT IN D~PL~ATE 5/12/94 WELL R-32i(22-33-12-13) Stimulation Ot}eration A BullHead HCL Acid Wash Treatment was performed using the following fluids: SUMMARY: MIRU BJ. Choke wide open at 176 beans taking 5.2 MBPD at 2100 psi.. Closed choke and wing. ILP increased to 2180 psi. PT to 4000 psi. Started pumping 15% HCL and 10% Xylene mixture. FLUIDS PUMPED BBLS. 320 165 Sea Water Acid (15% HCL and 10% Xylene) RECEIVED &,6aa Gona, Gommiasion LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 5 October 1994 Transmittal of Data Sent by: U.S. MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION /; P-13 R-32 (22-33-12-13) C-33 (17-11-14) F-19 (41-35-12-13) 1 PL/INJPROF. FINAL BL 1 PL/INJPROF. RF SEPIA 1 PL/INJPROF. FINAL BL 1 PL/INJPROF. RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA i PFC/PERF FINAL BL I PFC/PERF RF SEPIA Run # 1 Run # i Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 5025.04 6106.06 6123.02 6275.01 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 _ Attn.~Ro~ney D. Paulson % RECEIVED MAY 1 0 1994 Alaska 01~ & G~s Cons, Commission Anchorage ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date= 28 April 1994 RE= Transmittal of Data Sent by= ANCHORAGE XPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PLS PROFILE FINAL BL ., /1 PLS GASLFT FINAL BL I PLS PROFILE RF SEPIA //1 PLS GASLFT RF SEPIA ~%.t~ R-32 (22-33-12-13) /1 PLS INJPROF.FINAL BL 1PLS INJPROF.RF SEPIA 1 PLS FINAL BL /1 PL$ FINAL RF SEPIA .- ~0'"~. F-14 (33-35-12-13) /~ PL$ FINAL BL 1 PLS FINAL RF SEPIA /~ PLS FINAL BL i PLS FINAL RF SEPIA ~SL-Iqo ~-~7 (34-15-11-13) / 1 DIFF.TEMP. FINAL BL I DIFF.TEMP. RF SEPIA c~ Run ~ 1 Run ~ 1 Run # Run ~ 1 Run # 1 Run # Run # 1 Run # 1 Run Run # Run # 1 Run # Run ~ 1 Run # I Run.# :L '.. Run ~ I Run ~ 1 Run ~ I ECC No. 6136.03 6106.05 1680.02 959.06 3560.01 959.05 5665.05 AOGCC Individual Well Geological Materials Inventory Page: Date: 03/03/94 PERMIT DATA T DATA_PLUS RUN DATE_RECVD 93-164 CNL/GR L 11650-12130 I 01/05/94 93-164 DIL/FL/GR L 11650-12130 I 01/05/94 93-164 GR/CCL (PSR) L 11520-11960 I 12/20/93 93-164 PFC/CCL (PERF) L 11800-12031 1 02/22/94 93-164 PFC/GR/CCL L 11640-11740 I 02/04/94 93-164 SBT/GR/CCL L 11460-12058 I 12/20/93 93-164 407 R COMP DATE:01/17/94 01/25/94 93-164 DAILY WELL OP. R 11/18-12/08/93 01/25/94 93-164 SURVEY R 0.00-11689, SPERRY SUN 01/25/94 93-164 5946 T 11650-12074 , OH/LDWG I 01/05/94 Are dry ditch samples required? yes no And received? Was the well cored? yes no Analysis & description received? Are well tests required? yes no Received? yes no Well is in compliance Initial yes no yes no Comments ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 7 February 1994 RE: Transmittal of Data ECC #: 6106.04 Data: PL Dear Sir/Madam, Reference: BP R-32 (22-33-12-13) PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: Sent by U.S. MAIL PFC PERF FINAL BL Run 'Run Received by: Date: Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 25 January 1994 RE: Transmittal of Data ECC #: 6106.03 Data: PL Dear Sir/Madam, Reference: BP R-32 (22-33-12-13) PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: 1 1 Sent by U.S. MAIL PFC/GR FINAL BL Run # 1 Run # i Received by: Date: Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION C ' ISSION WELl COMP! .ETLON OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSI=I~DED [] ABAN[Z)NED [] SERVICE I-xl W~at~r In?:~tnr 2. Name of Operator 7. Permit Number BP Exploration r'~ r') ! i~ ! i~ ! A I 93-164 3. Address~,J ~ I ~ J I~ ,~ L B. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5o.029-22413 4. Location of well at surface 9. Unit or Lease Name  ! Prudhoe Bay Unit 699' NSL, 1258' EWL, SEC. 32, T12N, R13E ¥~~ 10. we# Number At Total Depth ~ Prudhoe Bay Fielcl/Prudhoe Bay Pool 3488' NSL, 2698' EWL, SEC. 33, T12N, R13E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. KBE = 53.5' ! ADL 28278 '12. Date SpUdded 13. Da~e T.D. ReaChed 14. Date Comp., Suap. or Aband. 115. Water Deplh, if offshore 116. No. of Completions 11/18/93 12/3/93 1/17/94I N/A feet MSL I One 12135' MD/9237' TVD 12059' MD/9168' TVD YES r~ fa:) []! 2134' feet MD! 1900' (Approx.) 22. Type Electric or Other Logs Run DIL/SONIC/GR/CNL/MWD 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BoTr(:~ HOLE SIZE CEM~ RECORD AMOUNT PULLED 20" 91.5# H-40 32' 110' 30" 260 sx Arcticset (Approx.) 13-3/8" 68# NT-80 34' 3340' 16" 1270 sx CS 111/375 sx "G" 9-5/8" 47# L-80 32' 11674' 12-1/4" 1100 sx Class "G" 7" 26# L-80 11521' 12135' 8-1/2" 170 sx Class "G" 24. Perforations open lo Production (MD+TVD of Top and Bottom and 25. TI~ING RECORD ' interval, size and number) SIZE DEPTH SE'r (MD) PACKER SET (MDI Gun Diameter 3-3/8" 6 spf 5-I/2", L-80 11529' 11464' MD TVD 11696'- 11744' 8836'-8880' 11822'- 11912' 8952'-9034' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIALUSED Freeze protected w/134 bbls diesel 27. PRODUCTION TEST Date First Production IMethod of operation (Flowing, gas lift, etc.) 1/18/94 I Injection Date of Test Hours Tested RRODt.ICTIONFOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. ~4-HOUR RATE , 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit ~ore chip~. RECEIVED JAN 2 5 1994 Aisska 0il & Gas Cons. Commission Anchorage Submit in duplicate Form 10-407 Rev. 7-1-80 C, ONTIMJED ON REVERSE SIDE I~ I .~ 30. GEO~ MARKERS FOliaTION TESTS NAME I Include Interval lasted, pre~sure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phaIe. , Subsea Sag River 11697' 8782' Shublik 11745' 8826' Top Sadlerochit 11822' 8897' 31. LIST OF ATTACHMENTS , Signed(~/~~l"/~'~TitleOrillir~_EngineerSuoervisor'~~f'~'~'~J~- Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". ~ I~ C ~ IV ~ 0 Form 10-407 Gas 00ns. 60mmissio~ Anchorage BP/AAI SHARED SERVICE WELL: R-32 I BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: DAILY OPERATIONS PAGE: 1 ACCEPT: 11/18/93 08:00 SPUD: 11/18/93 05:00 RELEASE: OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 11/18/93 (1) TD: 110' ( 0) 11/19/93 (2) TD: 1110' (1000) 11/20/93 (3) TD: 2788'(1678) 11/21/93 ( 4) TD: 3360'( 572) 11/22/93 ( 5) TD: 3360' ( 0) 11/23/93 (6) TD: 4640'(1280) 11/24/93 (7) TD: 6320'(1680) 11/25/93 (8) TD: 8075' (1755) 11/26/93 (9) TD: 8950' ( 875) MIRU MOVE RIG. MW: 0.0 VIS: 0 DRLG. MW: 8.9 VIS:300 N/U DIVERTER. RIG ACCEPTED @ 08:00 HRS, 11/18/93. MIX SPUD MUD. TEST DIVERTER. P/U BHA. SPUD WELL @ 17:00 HRS, 11/18/93. DRLG F/ 110'-1110'. DRLG. MW: 9.5 VIS:300 DRLG F/ 1110'-2698'. CBU. SHORT TRIP TO 846'. DRLG F/ 2698' -2788' . CMT CSG. MW: 9.7 VIS: 81 CIRC. DRLG F/ 2788'-3360'. CIRC. SHORT TRIP TO 845'. CIRC. POOH. RIH W/ 13-3/8" CSG. WASH CSG. TO BTM. CIRC. PUMP 75 BBLS WATER, 1270 SX LEAD CMT. 375 SX TAIL CMT. TEST BOPE. MW: 8.3 VIS: 0 CISP CMT. BUMP PLUG W/ 2000 PSI. N/D DIVERTER. TOP JOB W/ 165 SX ASII CMT. N/U BOPE. TEST BOPE. DRLG. MW: 9.4 VIS: 41 N/U BOPE. TEST'BOPE. M/U BHA. RIH. CIRC. DRLG FLOAT EQUIP, CMT, 10' NEW HOLE. CIRC. LOT (13.9 PPG EMW). DRLG F/ 2270'-4324'. CIRC. DRLG F/ 4324'-4420'. SHORT TRIP TO SHOE. DRLG F/ 4420'-4640'. DRLG. MW: 9.7 VIS: 42 DRLG F/ 4640'-5469'. CIRC. SHORT TRIP 11 STDS. DRLG F/ 5469'-5800'. CIRC. POOH. CHANGE BIT. RIH. DRLG F/ 5800'-6320'. DRLG. MW: 9.7 VIS: 46 DRLG F/ 6320'-6893'. SHORT TRIP 11 STDS. DRLG F/ 6893'-8075'. DRLG. MW: 9.9 VIS: 48 DRLG F/ 8075'-8123'. CBU. POOH. CHANGE BIT. RIH. DRLG F/ 8123'-8950'. RECEIVED JAN 2. ,~ 1994 u~ & Gas Cons. C~mmission Anchorage IELL : R-32I OPERATION: RIG : NABORS 28E PAGE: 2 11/27/93 (10) TD:10325' (1375) 11/28/93 (11) TD:10694' ( 369) 11/29/93 (12) TD:lllS0' ( 486) 11/30/93 (13) TD:l1330' ( 150) CIRC. MW:10.0 VIS: 45 DRLG F/ 8950'-9162' SHORT TRIP 11 STDS. DRLG F/ 9162'-10325'. CIRC] DRLG. MW:10.3 VIS: 46 CIRC. POOH. CHANGE BIT, BHA. RIH. REAM TO BTM. DRLG F/ 10325'-10694'. DRLG. MW:10.5 VIS: 45 DRLG F/ 10694'-10824'. SHORT TRIP 11 STDS. DRLG F~ 10824'-11180'. DRLG. MW:10.5 VIS: 45 DRLG F/ 11180'-11253'. CIRC. POOH. TEST BOPE. CHANGE BIT. RIH. REAM TO BTM. DRLG F/ 11253'-11330'. 12/01/93 (14) TD:11689' ( 359) CHANGE RAMS. MW:10.6 VIS: 39 DRLG TO 11689'. CIRC. SHORT TRIP TO 9765'. CIRC. POOH. CHANGE RAMS. 12/02/93 (15) TD:11689' ( 0) INSTALL WEAR BUSHING. MW: 10.6 VIS: 41 TEST BOPE. RIH W/ 9-5/8" CSG. CIRC. PUMP 50 BBLS MCS4 SPACER, 700 SX LEAD CMT, 400 SX TAIL CMT. DISP W/ MUD. NO BUMP PLUG. R/D CMT HD, LAND JT. INSTALL PACKOFF. TEST SAME. 12/03/93 (16) TD: 12000' ( 311) DRLG. MW: 9.3 VIS: 43 RIH. CBU. TEST CSG. OK. DRLG FLOAT EQUIP, CMT. CIRC. DRLG F/ 11689'-12000'. 12/04/93 (17) TD:12135' ( 135) POOH W/ FISH MW: 9.2 VIS: 45 DRILL FROM 12000-12135'. CIRC BOTTOMS UP. SHORT TRIP TO 9 5/8" SHOE. CIRC SWEEP. DROP ESS MULTI SHOT TOOL. TRIP OUT OF HOLE FOR LOGS. RIG UP ATLAS WIRELINE. LOGGING RUN #1. WAIT ON FISHING TOOLS. MAKE UP FISHING TOOLS & TRIP IN HOLE. 12/05/93 (18) TD:12135' ( 0) RUN 7" LINER MW: 9.2 VIS: 44 TRIP OUT OF HOLE & LAY DOWN FISH & FISHING TOOLS.. MAKU UP BHA FOR WIPER TRIP & RUN IN HOLE. CUT & SLIP 104" OF DRILLING LINE. .TIRP IN HOLE. PRECAUTIONARY REAM FROM 11970 - 12135'. CIRC SWEEP AROUND. DROP ESS SURVEY, PUMP PILL & DROP RABBIT. TRIP OUT OF HOLE & LAY DOWN BHA. RIG UP TO RUN 7" LINER. MAKE UP 16 JTS 7" LINER & HANGER. RUN IN HOLE WITH 5" DRILL PIPE. L : R-32I OPERATION: RIG : NABORS 28E PAGE: 3 12/06/93 (19) TD:12135' ( 0) 12/07/93 (20) TD:12135 PB:12059 12/08/93 (21) TD:12135 PB:12059 LAY DOWN DRILL PIPE MW: 9.2 VIS: 0 TRIP IN HOLE WITH 7" LINER ON 5" DRILL PIPE.. BROKE CIRC. CIRC AND RECIPROCATE 7" LINER. TEST CEMENT LINE. REVERSE CIRC. TRIP OUT OF HOLE & LAY DOWN LINER RUNNING TOOL. PICK UP CASING SCRAPERS & BHA. TRIP IN HOLE. TAG LANDING COLLAR @12059'. CIRC BOTTOMS UP. DISPLACE WELL TO SEA WATER. TEST CASING. LAY DOWN DRILL PIPE. RUNNING COMPLETION MW: 8.5 Seawater CUT AND SLIP DRLG LINE. TRIP OUT IF HOLE & LAY DOWN DRILL PIPE & BHA. CLEAR RIG FLOOR. RIG UP ATLAS WIRE LINE. LOGGING RUN #1 SBT/GR. CHANGE OUT LOGGING UNIT FOR MARKED LINE. PULL WEAR BUSHING. RIG UP TO RUN TUBING. RUN 5 1/2" COMPLETION. RELEASE RIG MW: 8.5 Seawater RUN 5 1/2" TUBING. SPACE OUT AND TEST CONTROL LINE PORTS. MU ALND TBG HANGER, RUN IN LOCKDOWN SCREWS, CLEAR FLOOR AND LAY DOWN LANDING JT. GET 2 WAY CHECK, N/D RISER AND BOPE. N/U TREE AND ADAPTER FLANGE. PULL TWO WAY CHECK WITH LUBRICATOR. RIG UP AND U-TUBE 134 BBL DIESEL INTO ANNULUS AND TBG. DROP BALL. SET PACKER. SET BACK PRESSURE VALVE. PUMP CELLAR AND.SECURE TREE VALVES. RELEASE RIG AT 00:00 HRS 12/08/93. SIGNATURE: (drilling superintendent) DATE: RECEIVED JAN 2 5 1994 u, & I~as Cons. Commission Anchorage SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/R-32I ORIGINAL NORTH SLOPE COMPUTATION DATE: 12/ 3/93 DATE OF SURVEY: 120193 MWD SURVEY JOB NUMBER: AK-MW- 30084 KELLY BUSHING ELEV. -- 55.10 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -55.10 0 0 123 123.00 67.90 0 12 245 245.00 189.90 0 12 335 335.00 279.90 0 30 425 424.99 369.89 0 42 N .00 E .00 .00N .00E S 29.80 W .16 .19S .11W S 22.40 E .14 .57S .13W S 24.70 W .44 1.07S .24W S 7.80 W .29 1.97S .47W .00 -.17 -.34 -.63 -1.20 516 515.99 460.89 0 36 606 605.94 550.84 2 24 695 694.68 639.58 6 5 786 784.82 729.72 9 36 880 876.55 821.45 15 23 S 84.30 E 1.03 2.57S .08W N 72.20 E 2.07 2.04S 2.19E N 64.70 E 4.20 .55N 8.24E N 63.20 E 3.85 6.04N 19.39E N 62.10 E 6.18 15.42N 37.43E -1.06 1.24 7.82 20.22 40.48 975 968.07 912.97 15 41 1069 1058.86 1003.76 14 18 1165 1152.03 1096.93 13 36 1260 1244.35 1189.25 13 41 1355 1336.58 1281.48 14 0 N 61.60 E .35 27.44N 59.88E N 62.10 E 1.50 38.92N 81.33E N 62.70 E .74 49.64N 101.84E N 62.70 E .11 59.93N 121.76E N 65.50 E .77 69.85N 142.21E 65.83 90.04 113.10 135.44 158.14 1450 1428.58 1373.48 14 53 1545 1520.18 1465.08 15 48 1641 1612.58 1557.48 15 41 1736 1703.92 1648.82 16 12 1831 1794.45 1739.35 19 6 N 69.40 E 1.39 78.91N 164.10E N 72.50 E 1.28 87.10N 187.87E N 75.50 E .85 94.28N 212.91E N 71.60 E 1.24 101.68N 237.93E N 65.70 E 3.58 112.27N 264.68E 181.83 206.92 232.79 258.73 287.50 1926 1882.66 1827.56 24 23 2022 1969.51 1914.41 26 0 2117 2054.26 1999.16 27 42 2212 2137.30 2082.20 30 23 2306 2216.92 2161.82 33 47 N 62.30 E 5.73 127.80N 296.24E N 63.60 E 1.76 146.37N 332.64E N 65.10 E 1.93 164.92N 371.32E N 67.60 E 3.12 183.38N 413.58E N 68.70 E 3.67 201.95N 459.95E 322.60 363.35 406.19 452.30 502.23 2402 2295.17 2240.07 37 0 2498 2370.64 2315.54 39 17 2593 2443.05 2387.95 41 24 2688 2513.02 2457.92 43 42 2784 2582.19 2527.09 44 5 N 69.20 E 3.35 221.91N 511.84E N 68.50 E 2.44 243.31N 567.13E N 65.70 E 2.92 267.27N 623.77E N 65.80 E 2.42 293.65N 682.33E N 64.10 E 1.30 321.84N 742.62E 557.82 617.09 678.58 742.78 809.28 2879 2650.35 2595.25 2975 2718.05 2662.95 3070 2783.44 2728.34 3166 2848.60 2793.50 3282 2926.30 2871.20 44 12 N 65.80 E 1.25 349.85N 802.56E 46 5 N 65.00 E 2.07 378.18N 864.43E 46 54 N 65.10 E .85 407.25N 926.91E 47 35 N 65.50 E .79 436.71N 990.96E 48 17 N 65.10 E .66 472.70N 1069.21E 875.38 943.39 1012.24 1082.68 1168.76 RECEIVED JAN 2 5 1994 ut~ & Gat Cons. Commission SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/R-32I 500292241300 NORTH SLOPE COMPUTATION DATE: 12/ 3/9 DATE OF SURVEY: 120193 MWD SURVEY JOB NUMBER: AK-MW-30084 KELLY BUSHING ELEV. = 55.10 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3393 3000.86 2945.76 3489 3066.75 3011.65 3584 3131.96 3076.86 3679 3196.26 3141.16 3775 3261.73 3206.63 47 17 N 64.80 E .92 507.51N 1143.70E 46 0 N 64.40 E 1.39 537.45N 1206.76E 47 17 N 64.60 E 1.38 567.19N 1269.11E 47 30 N 65.50 E .73 596.69N 1332.51E 46 30 N 65.50 E 1.04 625.80N 1396.40E 1250.91 1320.63 1389.62 1459.49 1529.66 3871 3328.18 3273.08 3966 3393.64 3338.54 4062 3458.68 3403.58 4156 3522.43 3467.33 4252 3589.89 3534.79 45 54 N 65.30 E .64 654.64N 1459.39E 47 0 N 68.70 E 2.84 681.52N 1522.76E 47 42 N 67.60 E 1.11 707.80N 1588.29E 46 54 N 66.70 E 1.10 734.62N 1651.95E 43 47 N 69.40 E 3.80 760.19N 1715.26E 1598.90 1667.73 1738.33 1807.41 1875.68 4348 3658.00 3602.90 4443 3723.08 3667.98 4539 3787.38 3732.28 4633 3850.16 3795.06 4729 3914.52 3859.42 45 47 N 68.50 E 2.19 784.49N 1778.38E 47 42 N 67.60 E 2.12 810.35N 1842.54E 48 12 N 68.30 E .75 837.11N 1908.61E 48 0 N 68.10 E .27 863.10N 1973.57E 47 47 N 68.00 E .22 889.72N 2039.64E 1943.29 2012.47 2083.75 2153.71 2224.93 4824 3978.51 3923.41 4919 4043.18 3988.08 5015 4109.14 4054.04 5110 4174.48 4119.38 5205 4239.63 4184.53 47 30 N 69.20 E .99 915.34N 2105.01E 46 42 N 68.70 E .93 940.33N 2169.95E 46 30 N 67.80 E .71 966.18N 2234.73E 46 35 N 68~30 E .40 991.96N 2298.70E 46 47 N 66.20 E 1.62 1018.69N 2362.45E 2295.12 2364.69 2434.43 2503.39 2572.52 5301 4305.04 4249.94 5397 4370.08 4314.98 5492 4434.14 4379.04 5587 4498.38 4443.28 5683 4564.34 4509.24 47 17 N 65.00 E 1.05 1047.72N 2426.44E 47 24 N 65.30 E .25 1077.39N 2490.51E 47 47 N 66.20 E .82 1106.20N 2554.47E 47 5 N 65.80 E .80 1134.67N 2618.40E 46 5 N 66.40 E 1.14 1162.93N 2682.17E 2642.74 2713.30 2783.42 2853.38 2923.11 5778 4629.43 4574.33 5873 4693.97 4638.87 5969 4759.87 4704.77 6064 4825.02 4769.92 6160 4889.75 4834.65 47 24 N 64.80 E 1.84 1191.52N 2745.17E 47 0 N 65.50 E .69 1220.81N 2808.42E 46 17 N 65.80 E .76 1249.59N 2872.01E 47 5 N 66.20 E .90 1277.71N 2935.17E 48 5 N 67.20 E 1.29 1305.75N 3000.28E 2992.26 3061.91 3131.68 3200.80 3271.68 6255 4952.89 4897.79 6348 5013.84 4958.74 6442 5075.44 5020.34 6537 5138.70 5083.60 6632 5202.14 5147.04 48 35 N 67.10 E .53 1333.31N 3065.69E 49 30 N 67.40 E 1.00 1360.47N 3130.47E 48 35 N 67.10 E .99 1387.93N 3195.94E 47 54 N 66.50 E .87 1415.84N 3261.08E 48 17 N 67.20 E .69 1443.64N 3326.10E 3342.66 3412.90 3483.90 3554.77 3625.47 RECEIVED JAN 2 5 1994 ~ ~. :~ka Oil & Gas Cons. Commission Anchor~ SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/R-32I 500292241300 NORTH SLOPE COMPUTATION DATE: 12/ 3/9 DATE OF SURVEY: 120193 MWD SURVEY JOB NUMBER: AK-MW-30084 KELLY BUSHING ELEV. = 55.10 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6727 5265.59 5210.49 6821 5328.73 5273.63 6915 5392.05 5336.95 7011 5456.54 5401.44 7106 5520.66 5465.56 47 54 N 65.50 E 1.40 1472.00N 3390.86E 47 42 N 63.90 E 1.28 1501.75N 3453.81E 47 35 N 63.20 E .56 1532.70N 3516.01E 48 0 N 63.70 E .57 1564.48N 3579.63E 47 5 N 64.60 E 1.18 1595.05N 3642.71E 3696.16 3765.71 3835.02 3905.97 3975.95 7201 5585.87 5530.77 7296 5651.26 5596.16 7390 5715.25 5660.15 7485 5779.55 5724.45 7579 5842.87 5787.77 46 12 N 65.10 E 1.02 1624.41N 3705.23E 46 47 N 63.00 E 1.72 1654.56N 3767.18E 47 24 N 65.50 E 2.05 1684.46N 3829.19E 47 24 N 67.60 E 1.63 1712.29N 3893.33E 47 54 N 67.30 E .58 1738.93N 3957.49E 4044.96 4113.74 4182.48 4252.39 4321.86 7672 5905.58 5850.48 7767 5970.61 5915.51 7861 6035.26 5980.16 7956 6100.17 6045.07 8051 6164.59 6109.49 47 17 N 67.20 E .65 1765.49N 4020.83E 46 17 N 68.30 E 1.35 1791.71N 4084.91E 46 47 N 68.80 E .66 1816.67N 4148.43E 47 0 N 68.80 E .21 1841.75N 4213.10E 47 35 N 68.50 E .67 1867.17N 4278.12E 4390.53 4459.78 4528.00 4597.35 4667.15 8145 6227.61 6172.51 8237 6289.35 6234.25 8333 6354.45 6299.35 8427 6418.50 6363.40 8520 6481.99 6426.89 48 12 N 69.20 E .84 1892.33N 4343.17E 47 30 N 68.80 E .83 1916.77N 4406.85E 47 5 N 68.10 E .68 1942.68N 4472.46E 47 0 N 68.30 E .19 1968.24N 4536.35E 46 54 N 69.00 E .56 1992.98N 4599.64E 4736.87 4805.05 4875.59 4944.38 5012.33 8615 6546.77 6491.67 8710 6611.38 6556.28 8804 6675.13 6620.03 8896 6737.46 6682.36 8989 6800.47 6745.37 47 5 N 68.50 E .44 2018.16N 4664.40E 47 12 N 68.00 E .40 2043.97N 4729.09E 47 24 N 67.20 E .66 2070.29N 4792.95E 47 17 N 67.40 E .19 2096.41N 4855.38E 47 24 N 68.00 E .49 2122.36N 4918.66E 5081.79 5151.42 5220.51 5288.17 5356.57 9084 6865.02 6809.92 9178 6929.19 6874.08 9270 6992.10 6937.00 9365 7057.32 7002.22 9460 7122.83 7067.73 47 0 N 68.30 E .48 2148.30N 4983.36E 46 54 N 68.00 E .26 2173.87N 5047.12E 46 47 N 67.60 E .34 2199.23N 5109.26E 46 30 N 68.50 E .76 2225.05N 5173.33E 46 17 N 67.80 E .57 2250.66N 5237.18E 5426.27 5494.95 5562.07 5631.15 5699.94 9553 7187.08 7131.98 9649 7253.53 7198.43 9742 7318.02 7262.92 9836 7383.25 7328.15 9931 7449.19 7394.09 46 17 N 67.60 E .15 2276.17N 5299.39E 46 5 N 67.60 E .21 2302.57N 5363.45E 46 5 N 67.80 E .16 2328.00N 5425.45E 46 0 N 69.00 E .93 2352.91N 5488.37E 46 5 N 68.10 E .69 2377.92N 5552.03E 5767.17 5836.46 5903.47 5971.13 6039.51 RECEIVED JAN 2.$ 1994 Oil & Gas Cons, CommJssi~ Anchorage SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/R-32I 500292241300 NORTH SLOPE COMPUTATION DATE: 12/ 3/93 DATE OF SURVEY: 120193 MWD SURVEY JOB NUMBER: AK-MW-30084 KELLY BUSHING ELEV. = 55.10 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 10026 7515.06 7459.96 10120 7580.18 7525.08 10214 7645.24 7590.14 10276 7688.16 7633.06 10371 7754.09 7698.99 COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 46 5 N 67.80 E .23 2403.62N 5615.47E 46 12 N 68.80 E .77 2428.68N 5678.45E 46 12 N 67.40 E 1.07 2453.99N 5741.40E 46 12 N 67.10 E .35 2471.29N 5782.67E 45 54 N 67.20 E .32 2497.85N 5845.69E VERT. SECT. 6107.96 6175.74 6243.57 6288.32 6356.71 10466 7820.44 7765.34 10560 7886.67 7831.57 10591 7908.84 7853.74 10623 7931.92 7876.82 10655 7955.05 7899.95 45 30 N 69.70 E 1.93 2522.82N 5908.91E 44 54 N 71.00 E 1.17 2545.26N 5971.72E 43 47 N 71.00 E 3.55 2552.31N 5992.21E 43 54 N 69.30 E 3.69 2559.84N 6013.06E 43 30 N 70~70 E 3.27 2567.40N 6033.83E 6424.68 6491.28 6512.91 6535.05 6557.13 10684 7976.22 7921.12 10715 7999.08 7943.98 10746 8022.17 7967.07 10779 8047.00 7991.90 10809 8069.79 8014.69 42 42 N 70.30 E 2.91 2574.01N 6052.51E 42 17 N 70.40 E 1.31 2581.06N 6072.24E 41 24 N 69.50 E 3.49 2588.15N 6091.66E 41 0 N 69.90 E 1.45 2595.69N 6112.05E 40 5 N 69.90 E 3.00 2602.39N 6130.37E 6576.92 6597.84 6618.50 6640.22 6659.70 10841 8094.49 8039.39 10873 8119.49 8064.39 10904 8144.04 8088.94 10936 8169.63 8114.53 10970 8197.15 8142.05 38 54 N 71.60 E 5.05 2609.10N 6149.58E 38 17 N 72.30 E 2.32 2615.29N 6168.56E 37 0 N 73.20 E 4.55 2620.91N 6186.64E 36 47 N 74.80 E 3.07 2626.20N 6205.11E 35 5 N 76.40 E 5.71 2631.17N 6224.44E 6680.02 6699.92 6718.77 6737.85 6757.61 11000 8221.86 8166.76 11031 8247.62 8192.52 11063 8274.32 8219.22 11095 8301.18 8246.08 11127 8328.29 8273.19 34 0 N 77.60 E 4.31 2635.00N 6241.01E 33 35 N 78.90 E 2.67 2638.51N 6257.89E 33 17 N 78.10 E 1.67 2642.03N 6275.18E 32 30 N 76.40 E 3.82 2645.86N 6292.13E 31 42 N 76.20 E 2.52 2649.89N 6308.65E 6774.38 6791.32 6808.63 6825.75 6842.55 11144 8342.77 8287.67 11190 8382.20 8327.10 11221 8409.03 8353.93 11253 8436.91 8381.81 11284 8464.09 8408.99 31 30 N 76.60 E 1.70 2651.98N 6317.31E 30 30 N 74.50 E 3.20 2657.89N 6340.25E 29 36 N 73.40 E 3.40 2662.18N 6355.16E 29 12 N 73.20 E 1.29 2666.69N 6370.21E 28 17 N 73.80 E 3.05 2670.93N 6384.51E 6851.35 6874.79 6890.21 6905.84 6920.67 11316 8492.31 8437.21 11348 8520.65 8465.55 11379 8548.25 8493.15 11409 8575.16 8520.06 11441 8604.04 8548.94 27 53 N 74.10 E 1.33 2675.09N 6398.99E 27 30 N 74.10 E 1.25 2679.17N 6413.30E 26 36 N 73.40 E 3.08 2683.11N 6426.83E 25 53 N 73.20 E 2.35 2686.93N 6439.54E 25 6 N 72.20 E 2.84 2691.02N 6452.69E 6935.64 6950.41 6964.42 6977.62 6991.34 RECEIVED JAN 2,5 Oil & 8as ConsI Commission SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 PRUDHOE BAY DRILLING PBU/R-32I 500292241300 NORTH SLOPE COMPUTATION DATE: 12/ 3/93 DATE OF SURVEY: 120193 MWD SURVEY JOB NUMBER: AK-MW-30084 KELLY BUSHING ELEV. = 55.10 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 11472 8632.14 11503 8660.29 11535 8689.43 11567 8718.62 11591 8740.53 8577.04 24 53 N 71.50 E 1.15 8605.19 24 36 N 70.40 E 1.77 8634.33 24 12 N 69.50 E 1.71 8663.52 24 12 N 69.70 E .25 8685.43 24 0 N 69.70 E .84 2695.10N 6465.14E 7004.40 2699.34N 6477.41E 7017.35 2703.87N 6489.83E 7030.56 2708.44N 6502.12E 7043.67 2711.84N 6511.31E 7053.46 11689 8830.05 8774.95 24 0 N 69.70 E .02 2725.67N 6548.70E 7093.29 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 7093.29 FEET AT NORTH 67 DEG. 24 MIN. EAST AT MD = 11689 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 67.40 DEG. RECEIVED JAN 25 1994- oi; & Cas Cons. Commission SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/R-32I 500292241300 NORTH SLOPE COMPUTATION DATE: 12/ 3/93 DATE OF SURVEY: 120193 JOB NUMBER: AK-MW-30084 KELLY BUSHING ELEV. = 55.10 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -55.10 .00 N .00 E 1000 992.14 937.04 30.66 N 65.83 E 2000 1949.74 1894.64 142.08 N 324.01 E 3000 2735.38 2680.28 385.80 N 880.76 E 4000 3416.83 3361.73 690.56 N 1545.93 E .00 7.86 7.86 50.26 42.40 264.62 214.35 583.17 318.56 5000 4098.82 4043.72 962.07 N 2224.66 E 6000 4781.29 4726.19 1258.78 N 2892.46 E 7000 5449.18 5394.08 1560.86 N 3572.30 E 8000 6130.18 6075.08 1853.39 N 4243.10 E 9000 6807.92 6752.82 2125.39 N 4926.17 E 901.18 318.01 1218.71 317.53 1550.82 332.11 1869.82 319.00 2192.08 322.26 10000 7497.03 7441.93 2396.54 N 5598.13 E 11000 8221.86 8166.76 2635.00 N 6241.01 E 11689 8830.05 8774.95 2725.67 N 6548.70 E 2502.97 310.88 2778.14 275.18 2858.95 80.80 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. RECEIVED JAN 2 $ 1994 Alaska Oil & Gas Cons. Commission Anchorag~ SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/R-32I 500292241300 NORTH SLOPE COMPUTATION DATE: 12/ 3/93 DATE OF SURVEY: 120193 JOB NUMBER: AK-MW-30084 KELLY BUSHING ELEV. = 55.10 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE 0 .00 -55.10 .00 N .00 E .00 55 55.10 .00 .00 N .00 E .00 155 155.10 100.00 .28 S .16 W .00 255 255.10 200.00 .60 S .12 W .00 355 355.10 300.00 1.23 S .31 W .00 VERTICAL CORRECTION .00 .00 .00 .00 455 455.10 400.00 2.34 S .52 W .01 555 555.10 500.00 2.61 S .33 E .02 655 655.10 600.00 .95 S 4.94 E .15 755 755.10 700.00 3.94 N 15.19 E .81 857 855.10 800.00 12.80 N 32.46 E 2.73 .01 .01 .13 .66 1.91 961 955.10 900.00 25.70 N 56.68 E 6.42 1065 1055.10 1000.00 38.47 N 80.48 E 10.02 1168 1155.10 1100.00 49.98 N 102.50 E 13.06 1271 1255.10 1200.00 61.13 N 124.09 E 15.97 1374 1355.10 1300.00 71.77 N 146.41 E 18.98 3.70 3.59 3.04 2.91 3.01 1477 1455.10 1400.00 81.40 N 170.71 E 22.35 1581 1555.10 1500.00 90.07 N 197.29 E 26.19 1685 1655.10 1600.00 97.34 N 224.49 E 30.08 1789 1755.10 1700.00 107.13 N 252.63 E 34.43 1895 1855.10 1800.00 122.31 N 285.59 E 40.85 3.36 3.84 3.89 4.35 6.42 2005 1955.10 1900.00 143.24 N 326.35 E 50.87 2117 2055.10 2000.00 165.11 N 371.72 E 62.85 2232 2155.10 2100.00 187.41 N 423.42 E 77.63 2352 2255.10 2200.00 211.46 N 484.51 E 97.29 2477 2355.10 2300.00 238.65 N 555.30 E 122.81 10.02 11.98 14.78 19.66 25.53 2609 2455.10 2400.00 271.65 N 633.45 E 153.97 2746 2555.10 2500.00 310.37 N 719.01 E 191.18 2885 2655.10 2600.00 351.74 N 806.77 E 230.52 3028 2755.10 2700.00 394.51 N 899.47 E 273.44 3175 2855.10 2800.00 439.66 N 997.43 E 320.53 31.16 37.21 39.34 42.92 47.09 3325 2955.10 2900.00 486.31 N 1098.52 E 370.18 3472 3055.10 3000.00 532.24 N 1195.88 E 417.13 3618 3155.10 3100.00 577.95 N 1291.76 E 463.02 3765 3255.10 3200.00 622.90 N 1390.04 E 510.27 3909 3355.10 3300.00 666.01 N 1484.99 E 554.75 49.65 46.94 45.89 47.24 44.48 RECEIVED JAN 2. 5 1994 Alaska Oil & Gas Cons. Commission Anchorage, SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/R-32I 500292241300 NORTH SLOPE COMPUTATION DATE: 12/ 3/93 DATE OF SURVEY: 120193 JOB NUMBER: AK-MW-30084 KELLY BUSHING ELEV. = 55.10 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 4056 3455.10 3400.00 4203 3555.10 3500.00 4343 3655.10 3600.00 4490 3755.10 3700.00 4640 3855.10 3800.00 706.30 N 1584.66 E 747.71 N 1683.30 E 783.39 N 1775.60 E 823.75 N 1875.15 E 865.14 N 1978.67 E 601.58 46.83 648.04 46.46 688.74 40.71 735.52 46.78 785.29 49.77 4789 3955.10 3900. 4936 4055.10 4000. 5081 4155.10 4100. 5227 4255.10 4200. 5374 4355.10 4300. O0 O0 O0 O0 O0 906.27 N 2081.12 E 944.93 N 2181.74 E 984.38 N 2279.67 E 1025.34 N 2377.53 E 1070.59 N 2475.71 E 834.24 48.95 881.28 47.04 926.70 45.42 972.50 45.80 1019.77 47.27 5523 4455.10 4400. 5669 4555.10 4500. 5815 4655.10 4600. 5962 4755.10 4700. 6108 4855.10 4800. O0 O0 O0 O0 O0 1115.53 N 2575.62 E 1159.08 N 2673.37 E 1203.41 N 2770.43 E 1247.55 N 2867.46 E 1290.77 N 2964.88 E 1068.11 48.34 1114.58 46.47 1160.83 46.25 1207.00 46.16 1253.15 46.15 6258 4955.10 4900. 6411 5055.10 5000. 6561 5155.10 5100. 6711 5255.10 5200. 6860 5355.10 5300. 00 00 00 00 00 1334.29 N 3068.01 E 1378.95 N 3174.69 E 1423.08 N 3277.73 E 1467.19 N 3380.30 E 1514.51 N 3479.84 E 1303.25 50.10 1356.14 52.89 1406.36 50.22 1456.26 49.90 1505.08 48.83 7008 5455.10 5400. 7156 5555.10 5500. 7301 5655.10 5600. 7448 5755.10 5700. 7597 5855.10 5800. O0 O0 O0 O0 O0 1563.78 N 3578.20 E 1610.86 N 3676.09 E 1656.42 N 3770.83 E 1702.16 N 3868.75 E 1744.15 N 3969.98 E 1553.75 48.67 1601.41 47.66 1646.51 45.10 1693.78 47.27 1742.14 48.36 7744 5955.10 5900. 7889 6055.10 6000. 8036 6155.10 6100. 8186 6255.10 6200. 8333 6355.10 6300. O0 O0 O0 O0 O0 1785.71 N 4069.83 E 1824.31 N 4168.13 E 1863.36 N 4268.45 E 1903.24 N 4371.86 E 1942.94 N 4473.11 E 1789.45 47.31 1834.89 45.44 1881.82 46.94 1931.10 49.28 1978.85 47.75 8480 6455.10 6400. 8627 6555.10 6500. 8774 6655.10 6600. 8922 6755.10 6700. 9069 6855.10 6800. O0 O0 O0 O0 O0 1982.68 N 4572.82 E 2021.44 N 4672.73 E 2061.85 N 4772.87 E 2103.75 N 4873.03 E 2144.37 N 4973.48 E 2025.55 46.70 2072.13 46.58 2119.31 47.18 2166.91 47.60 2214.36 47.45 RECEIVED SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/R-32I 500292241300 NORTH SLOPE COMPUTATION DATE: 12/ 3/93 DATE OF SURVEY: 120193 JOB NUMBER: AK-MW-30084 KELLY BUSHING ELEV. = 55.10 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9215 6955.10 6900.00 2184.24 N 5072.79 E 2260.83 46.47 9361 7055.10 7000.00 2224.20 N 5171.16 E 2306.68 45.85 9506 7155.10 7100.00 2263.42 N 5268.44 E 2351.61 44.93 9651 7255.10 7200.00 2303.19 N 5364.96 E 2396.16 44.56 9795 7355.10 7300.00 2342.43 N 5461.16 E 2440.37 44.20 9939 7455.10 7400.00 2380.21 N 5557.73 E 2484.43 44.06 10083 7555.10 7500.00 2419.23 N 5654.07 E 2528.66 44.24 10228 7655.10 7600.00 2457.94 N 5750.89 E 2573.14 44.48 10372 7755.10 7700.00 2498.26 N 5846.66 E 2617.35 44.21 10515 7855.10 7800.00 2534.95 N 5941.95 E 2660.30 42.94 10655 7955.10 7900.00 2567.42 N 6033.88 E 2699.97 39.67 10789 8055.10 8000.00 2598.09 N 6118.61 E 2734.59 34.62 10917 8155.10 8100.00 2623.32 N 6194.62 E 2762.75 28.16 11039 8255.10 8200.00 2639.47 N 6262.77 E 2784.88 22.13 11158 8355.10 8300.00 2653.73 N 6324.66 E 2803.36 18.48 11273 8455.10 8400.00 2669.55 N 6379.82 E 2818.67 15.31 11386 8555.10 8500.00 2684.09 N 6430.09 E 2831.54 12.87 11497 8655.10 8600.00 2698.54 N 6475.16 E 2842.19 10.65 11606 8755.10 8700.00 2714.09 N 6517.40 E 2851.85 9.66 11689 8830.05 8774.95 2725.67 N 6548.70 E 2858.95 7.09 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS RECEIVED JAN 2 5 i994 ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 27 December 1993 RE: Transmittal of Data ECC #: 6106..00 Data: OH-LDWG Dear Sir/Madam, Reference: BP R-32 (22-33-12-13) PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: /Diskettes: Sent by U.S. MAIL 0%DIFL LDWG TAPE+LIST Run # i Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 27 December 1993 RE: Transmittal of Data ECC #: 6106.00 Data: OH-LDWG Dear Sir/Madam, Reference: BP R-32 (22-33-12-13) PRUDHOE BAY NORTH SLOPE, AK Enclosedr-p].eas. e find the data as described below: ~~.~Diskettes: 1 Prints/Films: DIFL LDWG TAPE+LIST DIFL/GR FINAL BL CN/GR FINAL BL DIFL/GR FINAL RF CN/GR FINAL RF Sent by U.S. MAIL Run # iw Run # 1/ Run # 1 Ii(~O--IZ.,IgO ~¢~' Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson / &- Date: ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501.'USA Date: 13 December 1993 RE: Transmittal of Data ECC #: 6106.02 Data: NONE Dear Sir/Madam, Reference: -BP R-32 (22-33-12-13) PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as d~scribed below: Prints/Films: 1 GR/CCL FINAL 1 GR/CCL FINAL BL Sent by U.S. MAIL Run # Run # 1 Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. 'USA Date= 16 December 1993 RE: Transmittal of Data ECC ~: 6106.01 Data: SBT/GR Dear Sir/Madam, Reference: BP R-32 (22-33-12-13) PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: 1 1 Sent by U.S. MAIL SBT/GR/CCL FINAL RF SBT/GR/CCL FINAL BL Run # 1 Run # 1 It ,q too Received by: Please sign and return to: Atlas Wireline Services Petrophysical Services 5600. B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Date: i MEMORANDU State o laska Alaska Oil and Gas Conservation Commission TO: David John,~' DATI~: Chairm~.-' TI~IRU: Blair Wondzell, ~ ,/z~ ~!~ NO: P. t. SupervisOr FROM: Bobby Foster,~~[~ SUBJECT: Petroleum Inspector November 22, 1993 AIRIKVAD.doc BOP Test- Nebors 28E BP X - PBU - R- 32 PTD # 93 - 164 ~' PB Field Monday, November 22,. 1993: I traveled to BPX's R Pad, well 32, this date and witnessed the BOPE.test on Nabors rig 28 E. As the attached BOPE Test Report shows there were no failures. The ram type preventers were changed out on the BOP stack on this hole because of wear on the'old ones, which will be sent back to the rebuild shop for repairs. The rig was in good shape and the location was clean and all equipment was arranged neatly for easy access to the rig and surrounding, area. Summary: I witnessed the BOPE test on Nabors rig 28E- no failures. Attachment: AIRIKVAD.XLS STATE OF ALASKA OIL AND GAS CON_. SEDATION COMMISSION ~ Test Report. OPERATION: Drlg:.__: X : Workover: .., ...... DATE: f 1/22193 ....... Drlg Contractor:....... NABOR$ Rig~No. 28E PTD# _,73 - f64. Rig Ph.# .... 659 -~ Operator: ~ .~ ..... ~ ~"'BPX .... "'-"' Rep.: JAMES CARII'LE Well Name: " ' R' 32 .............. Rig Rep.: ................ ~i~"~Y ' '" ~ Size: ~-~' 13.375 ' "~:~ , ....r~..~,~. .... ,Location: Sec.. 32 r~ T.. _/2N R. * f3E Meridian',,..', u.. , Test: Init! ' X' Weekly Other Test MISC. INSPECTIONS: FLOOR S~M=~ VALVE8: Quan. Pressure P/F · Location Gen.: OK_ Well Sign OK Upper Kelly / IBOP I i . 500/~ . ~ P Ho~eping: 'OK_ (Gan) Dri. Rig. '0~' Lower Kelly i IBOP Ii 5001500~i P Reserve Pit ,N,/A, ...... Ball Type . '~ ii 'SOO ~-~0q_ P I,s~e sop ,- ~ l s~/Sooq~ Test BOP STACK: Quan.. Pressure P/F Test Annular Preventer I ]. ~00,*t3000 ! P CHOKE MANIFOLD: Pressure P/F Pipe Rams ~ t ~'~"'~] i ' : .~ .... ' No. Valves f8 I 500/5000 P Pipe R~ams '"1 ' i ~'/S000. ' ! P'- No, F~anges 42 I' ~/~ i Blind Ran~ ........ / , .............. Manual Chokes I ! Functioned ] P. Choke tn. Valves t !/~': ~" ~'- P Hydraulic Chokes ~f~ Functio~ HCRValves i = l~ZSooo.'.-I P '-"- tCatl Une Valves f ] ~/~,,!' P~.' ~UMULATOR SYSTEM: Check ValveN/A i' ' ,..', '.] .... i'". S~em Pre~sur. 3,000 I. ...... Pressure After Closure ' ~,:~:'/'! p ~ SYSTEM: ~/~ual Alarm 200 psi Attained After Closure I minutes' 25 sec. Trip Tank YES YES ~m Pressure Attained .... ~- minutes -33-- sec. P~ Level Indicators YES-' ~'YES Blind Switch Covers: Master:. Yes. Rem0t~' yes. Ftowl'tldicator :"~Es.'_'::' YES Nitgn. Btl,s: ~ 81~~ ii''i _~ ~r of Failures: 0 ,Test Time: 2.0 ~rs. Number of valves ms~ 24.~ Repair or Replacement of Failed IEquipme~will be made ~in . ~..~ 0 ~..~ ~... days. No0fy ~ Inspec~r arrd followwith Written or Fmmd verification to ~the AOGCC Commission ~ at:' Fax N 276-7542' Inspect~ North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector ~ 12 hours please contact the P. 1. Supen~or at 279-1433 REMARKS: The ram type. ~venters were ch~.o~.~r a set of rebu//t one.~.. GOOD. TEST !!! · ~ . ., .:,,, ..... : , . ,~ .... :.. .~. ...: - - -:_ - .~. ;* . - * . ,, ,,, ....... ~ ...... ~ ............ . ~_~. ,.,. ........... . ~_ ~,. ,.. ~ ,. .. _ : ................................ : ._ _., .;.: . .............. ,, . ...... ~' ' : ...... : ; : * : ' ' ,.,~",,,. ...... ~ ". ' . . L ":: ..................'~: :: - · - _ ..... : .... : -*-. . - * ~n: - :'STATE WITNESs RE~i.REI~"- WaiVed By: orlg-Well File YES X NO c- Database 24 HOUR NOTICE GIVEN c- T~p.R~File 'YES X NO .... .. '... ''.'' ~ ........ ~i~ LI~' FI-O21L (Rev. 7/93) AIRIKVAD}(LS Chalrmah .,,,r-- State ( Alaska Masks Oil and Gas Conservation Commission DATI~: 11 - 18-93 ~_ U. Blair Wondzell, .~1~ ,~/~$ FI].,I~ NO: P. I, Supervisor/~/~ FROM: John Spauldin~ SUB,II, CT: Petroleum Inspedtor ejrlkraa,doc ,. 't Diverter Test Nab°rs 28E BPX/PBU/Well R-32 Prudhoe Oil Pool PTD 93-164 Thursday November 18, 1993: I traveled to BPX PBU well R- 32 to witness a diverter test on Nabors 28E Nabors has 2 hydraulic knife valves on their vent lines next to the diverter and also a manual knife valve on 1line outside the rig sub-base. Nabors toolpusher Mike Downey indicated to me that they were going to be changing the manual valve to a hydraulic knife valve and placing it inside the rig sub-base so it would stay warm. · The material and equipment on the pad was well laid out and plenty of room was made for any emergency services. Summary: I witnessed the diverter test on Nabors 28E--no failures Attachment; ejrlkraa ,...~ STATE OF. ALASKA ALASKA {~!.~ PAND Diverter ms In pec on Report Date: 11/1 S/93,,,. Operation: Development X_XX ._ Exploratory: ..... Drlg Contractor NABORS Rig Ne, 2~_ PTD # 93-164 Rig Ph. # 659-4863 ,~.,.~ . . ! ..... ,~ .~ · ,.,, il_ ,1 ii..ll .~ --- ~LJI Il I_L . --" IIII1'. ; .,., t * Operator: B,P. ~PLO'RATION Oper. 'Rep.: JAMES CARULE ............... _..,.. - ....... . .......... - -. ..... We# Name: R-32 ~g 'RM.: MIKE ,_~ i. ~.~1~ .... '. ; : :. :; ...... . ': " .-'~': .............' '''J "-'-'"-' - ..... - ..... ""-" '' J:- ' .... Location: Sec,... 30 T. .. 12N ....R. 13E Merdian UMIAT -:. - ,:~ ,, , :~ ~_ i ] ,,,, ,.,, , - -' Reserve Pil: - ~ Ftm,e Pit: ~ N/A , i .... .u ; DIVERTER SYSTEM INSPECTION: DiVerter Size: 20_ .... in, Divert Valve(s) Full Opening: ....YES" Valve(s) Auto & Simultaneous: ....... Vent Line(s) Size: '.:_ :!0.: _'_: in. Vent Line{s} Length~ 110 ft. Une(s) Bifurcated: Une(s) Down Wind: ...... ~ES ....... Es'" Line(s) Anchored: Tums Targeted/.Long Radius: _'iiYES _ ....... ACCUMULATOR SYSTEM: Systems Pre.ute: 3000 psig .: : :. .. :::. . .' , Pressure After CIo~um: ,,,. 1600. :. psig 200 psi A~ained After Closure: . 34 sec. Systems Pressure Attained: "1' min, ''--3'~ ' sec. Nitrogen Bottles: .::-. . ,,,~,~.. ..... 2~ _ ...-: .... ...... . ..... . .............. ........ psig MUD SYSTEM INSPECTION: Light Alarm Trip Tank: , OK .. _OK- Mud Pits: OK , O~K Flow Monitor: 0.~'."' . OK .. GAS DETECTORS: Light Alarm Methane OK OK Hydrogen Sulfide: '. 0'K "bK · . _ Manual Valv · Hydraulic Val~ _ Diverter Nabors 28E Direction No~h ': Non' comPlianCe 'item' 0'__ :"R~ai~; items ~:::::'-' ..o..:.--:_: .'_D'~i¥ is) And ~on=et the insp~'0r' e 61~g'3607 ' Remarks: .:.. .................: .. ............ : ...... . :..:...: ............. .: .. ............ . .......... . .:.. .... Distribution orig. - Well File o- Oper/Rep o - Database c - lll~0~t(Rle/. 7193 c - InspeCtor AOGCC REP.: EJRLKRAA.X'L~' OPERATOR REP.: . :- . . : ~., ...,. :,,:: .,~. JAMES CARLILE ALASKA OIL AND GAS CONSERVATION CO~I~ilSSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-143,3 TELECOPY: (I;)07) 276-7542 November 3, 1993 R. C. Maskell Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re .. Prudhoe Bay Unit R-32 BP Exploration (Alaska), Inc. Permit No: 93-164 Sur. Loc 699'NSL, 1258'EWL, Sec. 32, T12N, R13E, UM Btmhole Loc. 1822'SNL, 2642'WEL, Sec. 33, T12N, R13E, UM Dear Mr. Maskell: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W. ~hnston~ Chairman BY ORDER OF ~ COMMISSION dlf/Enclosure cc** Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation. w/o encl. ...'~ printed on recycled paper b y C.F}. STATE OF ALASKA '~ ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrill •I lb. Type of well. Exploratory l"l- Stratigraphic Test [] Development Oil [] Re-Entry .l-I DeepenFII Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 53.1 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28278 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(=es 2o AAC 2s.o~s) 699' NSL, 1258' EWL, SEC. 32, T12N, R13E Prudhoe Ba, v Unit At top of productive interval 8. Well number Number 1824' SNL, 2749' WEL, SEC. 33, T12N, R13E R-32 (22-33-12-13) 2S100302630-277 At total depth g. Approximate spud date Amount 1822' SNL, 2642' WEL, SEC. 33, T12N, R13E 11/20/93 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line ADL 28279-2636 feet R-5-16' (~ 1050' MD feet 2560 12116' MD/9239' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (s~e 20 ~c 2s.o3s (e)(2)) Kickoff depth 600 feet Maximum hole angle 4~, o Maximum surface ,~0 pslg At total depth (TVD) ~00'/4~90 pslg 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length M D TVD M D TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 32' 32' 110' 110' ,260 sx Arcticset (Approx.) 16" 13-3/8" 68~ L-80 Butt 3366' 31' 31' 3397' 3000' 127o sx cs Ily375 sx "G"/25o sx cs II 12-1/4" 9-5/8" 47# L-80 NSCC 11631' 30', 30' 11661' 8813' 1100 sx C!=;s "G" 8-112" 7" 26# L-80 NSCC 605' 11511' 8677' 12116' 9239' 170 sx Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate Production 0CT 2 0 1995 Liner Perforation depth: measured Alaska 0il & Gas Cons. c0mmiSS~0 true vertical Anchorage ;20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program l~! Drilling fluid prograj3:l [] Time vs d, dpth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirementsl-I 21. I hereby cej~l~lr~that the foregoing is true and correct to the be~t of my knowledge Signed E,,/~-'~~ ~,/~,~ _._ Title DrillingEngineerSupervisor Date Commission Use Only Permit Number IAPI number IApproval date _.., See cover letter ~'.~ -- ,,/~' ~ J5 O- 0 ~ ~' -- Z.. Z c/,./,..~ J /,/~,.~ ~. ~/'~.%~ for other requirements Conditions of approval Samples required [] Yes l~'No Mud log required [] Yes .~ No Hydrogen sulfide measures [] Yes ~ No Directional survey reqmrea ,B] Yes [] No Required working pressure for BOPE 1-12M; 1-13M; 1~5M; I-IIOM; I-i15M; Other: Original Signed By by order of Approved by David W. Johnston Commissioner me commission Date////~//~,~ Form 10-401 Rev. 12-1-85 Submit ir 'iplicate [Well Name: [R-32i Well Plan Summary I Type of Well (producer or injector):' [ Injector ] Surface Location: [Target Location: · [ Bottom Hole Location: [AFE Number: [ Estimated Start Date: ] Nov 20 1993 0699' FSL 1258' FWL See 32 T12N R13E 1824' FNL 2749' FEL See 33 T12N R13E 1822' FNL'2642' FEL See 33 T12N R13E [Rig: I Nabors 28.E [' Operating days to complete: ] 26 MD: 1 12116' I I TVD: [9239' ! [KBE: 153.1' Well Design (conventional, slimhole, etc.): [ Conventional Injector (pre-produced) Formation Markers: Formation Tops "MD TVD (BKB) , U~nu Zone 4A 5309 4303 'W~. Sak' Sands 6628 5201 Top Seabee 7761 ' ' 5973 KuP/Put R Absent IKRU/LCU 9880 7417 Top Sag R 11661 8813 Top Shublik ii704 8853 Top Sadlerochit 11809 8951 . Tarset 11805 8947 Total Depth 12116 9239 . Casin /Tubin: ' Prog'ram: Wt/Ft Hole Siz~ Csg/ " Wt/Ft'-' Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 30" 20" 91.5# H-40 Weld 80 32/32 110 16" 1'3 3/8" 68# L-80 Butt 3366 31/31 3397/3000 12 1/4" 9 5/8" 47# L-80 NSCC 11631 30/30 11661/8813 8 1/2" 7" 26g L-80 NSCC 605 11511/8677 12116/9239 RECEIVE Well Plan Summary OCT 2 0 199~ Alaska Oil & Gas Cons. CommlsSiOO Anchorage Page 1 Logging Program: OPen HOle LOgs: ] ' Surfac~ Hole I None Intermediate Hole Final Hole ! 'Cased Hole Logs: 7" Liner None GR/SDT/CNL/DII JSP. PoSsible LDT/GR and RFF. Possible Gyro and SBT. Mud Program: [Special design considerations I None Surface Mud Properties: ] Density ' M~rsh ' Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 100 20 15 10 9 5 to to t° to to to to 9.5 300 60 60 20 10 10 Intermediate Mud Properties: I ' ' Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 35 10 5 10 9.5 5 , to to to to to to to 10.2 50 15 10 20 10 8 .Production Mud Properties: ] . Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel. gel Loss . 8.8 30 8 3 7 8 6 to to to to to to to 9.2 45 13 10 15 9 8 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling flUid system schematics on file with AOGCC. Directional-. I KOP: 1600' Maximum Hole Angle: de~ees ClOse ApprOaCh Well: 147 I R-05, R-06. The above listed wells will be secured during the close approach. RECEIVED Well Plan Summary 0 CT 2 0 199;5 Page 2 Alaska Oil & Gas Cons. t;ommJssioo Anchorage 13 3/8" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 13 3/8" CIRC. TEMP 38°F SPACER: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE: ColdSet III ADDITIVES: retarder WEIGHT: 12.2 ppg APPROX #SACKS: 1270 YIELD:1.92 ft3/sx MIX WATER: 10.5 gps THICKENING TIME: Greater than 4 hrs @ 50°F TAIL CEMENT TYPE: Class G ADDITIVES: 2% A-7 +1 ghs FP-6L. WEIGHT: 15.8 ppg YIELD:1.15 ft3/sx APPROX #SACKS: 375 MIX WATER: 4.95 gps THICKENING TIME: Greater than 3 1/2 hrs @ 50°F TOP JOB CEMENT TYPE: Coldset II ADDITIVES: retarder WEIGHT: 14.5 ppg APPROX #SACKS: 250 CENTRALIZER PLACEMENT: 1. Run one(l) bow type centralizer per joint for the first 20 joints. 2. Place the centralizers in the middle of each joint with a stop collar. CEMENT VOLUME: 1. Lead slurry to surface w/100% excess. 2. Tail slurry volume 375 sx 3. Top job volume 250 sx. YIELD:0.96 ft3/sx MIX WATER: 3.89 gps THICKENING TIME: Greater than 2 hrs @ 50°F RECEIVED OCT 2 0 199,:3 Alaska 0il & Gas Cons. bummissio" Anchorage 9-5/8" INTERMEDIATE CASING CEMENT PROGRAM- BJ SERVICES CIRC. TEMP: 140° F S P A C E R: 50 bbls BJ MCS-4, weighted to current mud weight. LEAD CEMENT TYPE: CLASS G ADDITIVES: 0.4% FL-52+0.5% CD-32+3% A-2+lghs FP-6L WEIGHT: 11.0ppg YIELD: 3.31 ft3/sx MIX WATER: 20.9 gp$ APPROX #SACKS: 700 THICKENING TIME: Greater than 5 hrs at 140°F FLUID LOSS: 100-150 cc @ 140°F FREE WATER: 0 cc TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + lghs FP-6L WEIGHT: 15.8ppg YIELD: 1.14 cu ft/sk MIX WATER: 4.85 gps APPROX # SX: 400 THICKENING TIME: 3 1/2-4 1/2 hrs @ 140°F FLUID LOSS: 100-150 cc @ 140°F FREE WATER: 0 cc CENTRALIZER PLACEMENT: I Turbulator centralizer per joint on the bottom 500' of 9- 5/8" casing ( 12 required ). One solid body centralizer or turbolator on first 2 joints inside 13 3/8" surface casing shoe. OTHER CONSIDERATIONS: Pedorm lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12-14 bpm. Do not batch mix tail cement. CEMENT VOLUME: 1 .Lead slurry up to 6120' MD (500' above West Sak) with 30% excess to isolate Cretaceous interval. 2. Tail slurry to 1000' MD above casing shoe with 30% excess. 3. 120' MD 9-5/8", 47# capacity for float joints. RECEIVED OCT 2 0 199 Alaska 0il & Gas Cons. L;ommissio~ Anchorage 7" PRODUCTION LINER CEMENT PROGRAM - BJ SERVICES CIRC. TEMP 140°F PREFLUSH: 20 bbls fresh water BHST 226 deg F at 8800' TVDSS. SPACER: 70 bbls BJ MCS-4 weighted 1.0 ppg above mud weight. WEIGHT: 15.7 ppg APPROX #SACKS: 170 FLUID LOSS: < 50 cc @ 140°F CEMENT TYPE: CLASS G ADDITIVES: 150 ghs BA-86L+0.6% CD-32+0.2% FL-33+0.2% A-2+0.5% gel+2 ghs FP-10L YIELD:1.17 ft3/sx MIX WATER: 3.58 gps THICKENING TIME: 45 min @surface + 3-4 hrs @ 140°F FREE WATER: 0 cc at 45o angle. Note: Ensure that a thickening time test is performed that simulates the shut down time incurred while rotating off of the liner. Note gellation tendencys ( if any ) of slurry when consistometer is re-started after shutdown period - additional retarder may be required - consult w/cementer. CENTRALIZER PLACEMENT: Run 2 right hand turbolators per joint in open hole, I per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Report actual fluid loss on morning report. Displace @ 8-10 bpm. LINER CEMENT VOLUME: I , . Open hole (8 1/2" X 7") + 30% excess (adjust if a caliper log is run and it indicates severe washouts). 7", 26# casing capacity below landing collar. 150' liner lap 200' of cement on top of the liner in the 9-5/8" casing. RECEIVED OCT 2 0 199; Alaska 0il & Gas Cons. (;ommissio~ Anchorage Prudhoe Bay Dril~ Prudhoe Bay, Alaska R-PAD Well' R-32 File' R-32 WP3 o.oo- · &GO ND KOP, START I]F WILD e 2.00 DOG/lO0 FT 2,00' · 700 H9 4. oo' e ~oo ND &,Go* · 900 MD I tO00 HD o IlOO HD · 13oo HD · 1400 HD e I~oo HD · 1600 HD ! 17QQ HD 84.00* t 1800 ND ~6.00' e 19oo HD 30.00' ! 2100 HD ~.OO' I ~00 MD 34.00' · 2200 ~ 36.00' · 2400 MD 38.00' e ~500 HD 4O.O0' · ~&OO ,D HALL I BURTON ~RiLL I N~ ly$JJN$ I 0/1S/1993 II*l& off 3000 ¥P3 ~.500 I000 500 000 %oo 500 o 500 1ooo 15oo 2000 2500 3000 3500 4000 4500 5oo0 5500 &ooo &Soo 7000 -aO0 0 200 400 SO0 800 1000 l;::'O0 1400 1~00 1800 EO00 ZaO0 Z400 ZSO0 ZOO0 3000 3aO0 3400 3GO0 3800 4000 4~'00 4400 4600 4800 5000 5800 5400 5GO0 5800 VERTICAL SECTION PLANE: 6%48' V~RTICAL VIeW 72( X. SCALE 200 ft. / DIVISION ~ 'VD REF: RKO --~'~----~ 47.05* ~ 9~0 MD IK~ / LCU tI~ M VE~ICAL SE~ION REF: ~EAD 7~( 77; ' -- 78~ ~41  400 ~ , ~ , ~ , , ~ ', i600 5800 6000 6~00 6400 ~600 6800 7000 7~00 7400 7~00  47.05' @ 10325 ND START 0r CURVe ~ 2.00 ])EG/10O f'T 45.13' 0 104E5 HD 43.E~* ~ 10525 HO 41.3]* e lOGe5 ~ 39.41' e 10725 HD 37.52' e 1~5 KD ' 35,64' · 109~ ND 33.78' 8 II~ MD 28.27' · It~ HD ~ ~. I ~ V~e .... ~- · tJe~ .~ u~ / z4s BHL DATA TVD 9239.05 MD 12!15.51 VS 7198.86 North 2757.07 East 6649.97 CRITICAL PAINT DATA MD ]nc Az; TVa Nocth Eost TEE IN, RKO 53.1' 0 0,00 0,00 0 0 0 KDP. START DF 600 0,00 0.00 600 0 0 BUILD E 2.00 BEG/lO0 FT BA~E ~032 08,64 66.31 1973 141 3~ PERNAFROST END DF BUILD ~952 47.05 66.31 2697 367 836 SV3 / TT4 / T5 3472 47.05 66,31 3051 520 1184 UGNU ZONE 4A 531 0 47 , 0566.31 4303 ] 060E416 (UG4A) VS~ / TK4 6628 47.05 66.31 5~01 1447 3299 TOP SEABEE 7761 47.05 66.31 5973 1781 4059 (CM3) ]KRU / LCU 9880 47Jo5 66.31 7417 ~40'4 5479 START DF 10325 47.05 66.31 7720 ~535 5778 CURVE E 2.00 BEG/tO0 FT TOP SAG RIVER 11661 E~.37 85.50 88]3 ~755 649~ TOP SHUBLIK 11704 21.65 86.75 8853 2756 6508 E0.00 90.00 8947 2757 6544 20,00 90.00 8951 ~757 6545 TARGET 11805 PRUDHDE BAY 11809 MEHBER (TSAD) / Z4B CURRENT O~C 11870 TOP HEAVY 11912 DEL/TAR Z3 119~4 ORIGINAL DVC 11966 Z2C 12011 TOTAL DEPTH 12116 80,00 90,00 9008 2757 6566 20.00 90.00 9048 2757 6580 ~0.00 90.00 9059 ~757 6584 20,00 90.00 9098 2757 6599 20.00 90.00 9141 2757 6614 ~0.00 90.00 9239 ~757 6650 Ptan Chec Appr Do~e ned by ting By ked By oved By Lance J. Spencer lJSSlU~ 330° HALLIBURTDN 30o lO/15/lgg3 1:4~ p~ 300° 400 25O 270° 9O° 120° 2~0° ~ 150o %.% 180° WelllDo'th rOi ri0 ~-27 R34; ~ C~ST PO1NIS Slot R-03 R-04 R-07 R-lO R-It ~:I~ R-14 R-17 R-18 R-Ig - R-20 R-2! R-23 R-24 R-25 R-25 R-~6A R-27 R-28 R-31 R-J4 Iisi. once Drect;°n Ret MD Ref TVD 407,0B 258. tl O.O0 0.00 142327.60 185.57 257.95 0OC) 0.00 39550.80 74.67 L::~-J~.30 (::~0.00 ,El]g001 t&55 161.97 :1050.OO I04B.:15 34.53 ! ~,.75:1500.00 148'~.~7 2.80 60.60 154.89 . 84.03 15'3.41 ;iKT:,O. OO 1088.80 4.00 :~ a8.3~ 156.9~2250.oo2! (::,o.c~B 4..40 ~ 5~J.l~ 337,39~'~00.OO 244:1.455.00 26~7 334.842650.OO247g.47 8.:10 365.7:1336.222700.00~$6.92 JO.gO 496.~J~~.74 ~:~C).O0 ~44~ .4515.60 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A li/A N/A NVA hP'A N/A I~VA N/A NVA N/A N/A N/A N/A N/A l~ZA N/A N/A N/A NVA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 283.76 352.702300.00220:1.97 30e~9 3505~ 2400.00~B8 10BO N/A hl/A N/A NZA IxP'A N/A N/A N/A IxVA N/A 550.49 E~JB.O~ 600.OO 600.OO :14420 330133 L:xj7.7g 6430.0066]0.OOE~.40 ~1.46 Z59.3'3 6~0.00 650OO 5g.80 221 ~ 258.0~50.OO ~0.00 27~0.70 '3c'~~.76 1:13.41 '37'~0.00 '3~40.~7 4.50 CRITICAL POINT DATA MI) lnc AZ; TVD hlc~ th T]E I1~ RKB 53.1' 00.00 0.00 0 0 KEP, ST/~l' EF 600 0.00 0.00 E~)O 0 0 BUILD ~ 8.00 DEG/100 FT BASE 803~ a>8.6466,31 1973 141 3~! END DF' BUILD 2c15~47.05 66.3J 2697 367 836 SV3 / Tl4 / T'~3472 47.05 (:~,qJl 305'1 ~ 11`$4 ~ ZD'~ 4A 5310 47.05 66.31 4'30'3 1060 2416 (UG4A) W.S~ / TK4 66~8 47.05 66.3J '~-"~OJJ447 TDo SEABE[ 7761 47.05 66.31 5973 ! 78! 4O59 (O'43) ]KRU / LCU c1880 47.0~ 66.3),7417 2404 5479 ST/~T Dr. J03,,~j 47.05 66.3:177~) L:~5':)'5 5778 CURVE e DEC/lO0 FT TI~ S/K] RIVER11661 E~.37 1~.50 8813 2755 6~g2 ~[P ShUBLIK 1 t ?0~ 21,65 ~6,75 8~5~ 275~ 6508 TARC~T 11805 EO.O0 gO.O0 8947 2757 6544 PRUDI-II BA'f t 180920.00 gO. O08951 2757 6545 MEMBER (TSAD) / Z4B CURRENT I]WC 1 t 870 ~0.00 go,o0 gOC)8 2757 TEP HEAVY ! 1012~).00 gO.O0 0048 2757 6580 DIL/TAR Z3 ~!g24 20.00 go.o0 c~g 2757 6584 I~IGINAL DWC 11966 20.00 go. o0go~ 2757 ZEK2 1291t Eg. O0gO. O00141 2757 6614 TDlAL DEPTH 12116 20.00 gO.O0 gL~J~ 2757 66~D RECEIV D Created By OCT 0 199, Jchec ed Approved By Alaska Oil & Gas Cons. Commissio~ ~te Anchorage 1 O/15/93 BH_ DAIA TVD 9239.05 VS 7198,86 Nor'th 275%07 Eosi; 6649,97 ITEM · Fee Loc CHECK LIST FOR NEW WELL PERMITS (3) Admin [10 & 13] ' ' (4) Casg [14 thru 2 (5) BOPE thru Ze 5. 6. 7. 8. . 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Is pemit fee attached ............................................... Is we11 to be located in a defined pool .............................. Is well located proper distance from property Iine ................... Is well located proper distance from other wells ..................... Is sufficient undedicated acreage available in this pool ............. Is well to be deviated ~ is wellbore plat included ................... Is operator the only affected party .................................. Can permit be approved before 15-day wait .................... ~ ........ Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease nLmber appropriate .......................................... Does well have a unique name ~ nLmber ................................ Is conductor string provided ......................................... Wi 11 surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover al 1 known productive horizons ..................... W111 all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing we1 lbore ................... Is old wellbore abandonment procedure included on 10-403 ............. I s adequate we 11 bore separat i on ~proposed ............................. Is a diverter system requi red ........................................ Is drill ing fluid program schematic g 1 ist of equipment adequate ..... Are necessary diagrams & descriptions of dlverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~¢e~> ps ig ..... Does choke manifold comply.w/API RP-53 (Hay 84) ...................... Is presence of H2S gas 'probable ...................................... Lease & Well YES NO , ,, , RENARKS (6) Other ~'~. / ~_~_~ 29. ~-thrd 31] 30. 31. (7) Contact~y~[32~'~ 32. (8) Addl 33. geo 1 ogy: eng i nee r i ng: DWd~ MTM RAD ~ ~o-~'/ rev 6/93 3o/6.011 FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone ntmber of contact to supply weekly progress data ...... Additional requirements ' e...®..®.........®.......®.........®®........ Additional r~tmrks' MERIDIAN' UM X SM WELL TYPE' Exp~ Redrill Inj,,~, Rev Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD RUN 1 6106.00 R. ECK D. BOYER R - 32 (22-33-12-13) 500292241300 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 21-DEC-93 RUN 2 RUN 3 32 12N 13E 699 1258 55.10 53.60 20.30 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 9.625 PRODUCTION STRING 8.500 REMARKS: DIFL/CN/GR CIRCULATION STOPPED AT 1330, 03-DEC-93. 11674.0 12135.0 ONLY ONE DOWN LOG WAS PRESENTED DUE TO LINE FAILURE AT BOTTOM OF HOLE. NO UP LOGS ARE AVAILABLE. THE DEPTH REFERENCE FOR THIS WELL IS THE GR FROM THE SBT/GR DATED 06-DEC-93. THE SBT/GR WAS TIED TO A PFC/GR DATED 06-DEC-93 THAT WAS RUN WITH A MARKED LINE. THE PFC/GR DATA IS UNAVAILABLE. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, 8.5" BOREHOLE CORRECTION, CHISM FILTERING NOT ACTIVE, NO CASING OR SALINITY CORRECTIONS APPLIED. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GRCH GR DIL 2435 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA BASELINE DEPTH 11634.0 11664.0 11666.5 11695.5 11713.0 11737.5 11738.0 11742.0 11745.0 11745.5 11752.0 11754.5 11759.0 11771.0 11774.0 11776.0 11784.5 11785.0 11791.5 11798.0 11800.0 11807.5 11811.0 11813.5 11814.0 11815.5 11825.5 11826.0 11828.0 11839.5 11850.5 11856.5 11883.0 11883.5 11885.5 11886.0 11886.5 11897.0 11897.5 11934.0 depth shifted and clipped curves; all runs merged; no case 0.5000 START DEPTH STOP DEPTH 11458.0 12022.0 11651.0 12074.0 11715.0 12074.0 11657.0 12074.0 GR 11634.0 11666.0 11668.5 11697.0 GRCH from SBT/GR dated 06-DEC-93. (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... LL8 ILM NPHI 11634.0 11634.0 11634.0 11664.0 11739.0 11696.0 11714.0 11740.0 11740.0 11742.0 11745.5 11747.5 11746.5 11754.0 11754.0 11756.5 11756.0 11756.5 11776.0 11776.0 11759.5 11771.5 11777.5 11787.0 11787.0 11786.5 11787.0 11792.5 11799.0 11801.0 11808.5 11812.5 11812.5 11815.5 11815.0 11814.5 11815.5 11827.0 11827.0 11829.5 11829.5 11828.5 11840.5 11840.5 11850.5 11850.5 11850.5 11857.0 11857.0 11857.0 11884.5 11884.5 11887.5 11887.5 11886.5 11899.0 11899.0 11934.5 11934.5 11812.5 11815.5 11826.5 11829.5 11840.5 11850.5 11857.0 11883.0 11897.5 11934.5 11966.0 11966.5 11966.5 11967.0 11977.5 12056.0 12075.0 12075.0 12075.0 $ MERGED DATA SOURCE PBU TOOL CODE RUN NO. PASS NO. GRCH i 7 GR i 3 DIL i 3 2435 I 3 $ REMARKS: 11967.0 11977.5 12075.0 11934.5 11966.5 12056.5 12075.0 MERGE TOP 11458.0 11651.0 11715.0 11657.0 DOWN PASS. GRCH IS FROM SBT/GR RECORDED 06-DEC-93. SP WAS SHIFTED WITH GR (OPEN HOLE). MTEM, TENS, & TEND WERE SHIFTED WITH LL8. ILD WAS SHIFTED WITH ILM. FUCT & NUCT WERE SHIFTED WITH NPHI. MERGE BASE 12022.0 12074.0 12074.0 12074.0 ?MATCH1. OUT ?MATCH2. OUT ?MATCH3. OUT ?MATCH4. OUT CN : BP EXPLORATION WN : R - 32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 Name Tool Code Samples Units GRCH SBT 68 I GAPI GR DIL 68 i GAPI LL8 DIL 68 i OHMM ILM DIL 68 i OHMM ILD DIL 68 i OHMM SP DIL 68 i MV MTEMDIL 68 i DEGF TEND DIL 68 i LB TENS DIL 68 I LB NPHI 2435 68 i PU-S FUCT 2435 68 i CPS NUCT 2435 68 i CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 21 532 20 0 4 55 965 57 0 4 39 005 82 1 4 94 723 20 5 4 93 412 48 5 4 58 070 90 6 4 71 023 23 6 4 67 376 76 5 4 67 376 76 5 4 52 326 75 5 4 84 023 70 1 4 83 368 34 i * DATA RECORD (TYPE~ O) Total Data Records: 66 994 BYTES * mmmmmmm 48 Tape File Start Depth = 12075.000000 Tape File End Depth = 11455.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 Tape Subfile: 2 16134 datums 215 records... Minimum record length: Maximum record length: 62 bytes 994 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 3 0.2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GRCH 11458.0 12032.0 GR 11650.5 12074.0 DIFL 11708.0 12074.0 2435 11657.0 12074.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN KNJT PCM KNJT AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY coMPENSATED NEUTRON KNUCKLE JOINT PULSE CODE MODULATOR KNUCKLE JOINT BHC ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER' S CASING DEPTH (FT): LOGGER' S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TIgiPERATURE (DEGF): 03-DEC-93 FSYS REV. J001 VER. 1.1 1330 03-DEC-93 2035 03-DEC-93 12135.0 12133.0 11650.0 12074.0 2500.0 TOOL NUMBER 3974XA 3967XA 2806XA 1309XA 2435XA 3921NA 3506XA 3921NA 1609EA/1603MA 1503XA 8.500 11674.0 0.0 LSND 9.20 45.0 9.5 5.9 166.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: 3.330 1.060 3.850 0.000 3.790 0.000 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 8.500 TOOL STANDOFF (IN): 1.5 REMARKS: DOWN PASS. GRCH IS FROM SBT/GR RECORDED 06-DEC-93. $ CN : BP EXPLORATION WN : R - 32 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA 53.0 166.0 52.0 0.0 45.0 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ els Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 GR SBT 68 i GAPI GR DIFL 68 I GAPI RFOC DIFL 68 i OHMM RILMDIFL 68 I OHMM RILD DIFL 68 I OHMM CILD DIFL 68 I MMHO VILD DIFL 68 I MV VILM DIFL 68 i MV SP DIFL 68 i MV TEMP DIFL 68 I DEGF CHT DIFL 68 I LB TTEN DIFL 68 i LB TEN DIFL 68 I LB SPD DIFL 68 i F/MN CNC 2435 68 i PU-S CNCF 2435 68 I PU-S CN 2435 68 I PU-L LSN 2435 68 i CPS SSN 2435. 68 i CPS 4 4 21 532 20 0 4 4 67 456 14 5 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 34 704 23 6 4 4 04 522 10 6 4 4 04 522 10 6 4 4 53 419 67 0 4 4 40 467 34 0 4 4 78 867 34 0 4 4 78 867 34 0 4 4 78 867 34 0 4 4 13 331 34 0 4 4 98 211 23 1 4 4 98 211 23 1 4 4 52 326 75 5 4 4 84 023 70 1 4 4 83 368 34 1 76 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 207 Tape File Start Depth = 12075.000000 Tape File End Depth ~ 11455.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 49621 datums Tape Subfile: 3 288 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 4 is type: LIS 93/12/12 01 **** REEL TRAILER **** 93/12/22 O1 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 22 DEC 93 10:58a Elapsed execution time = 16.98 seconds. SYSTEM RETURN CODE = 0