HomeMy WebLinkAbout202-233Kaitlyn Barcelona Hilcorp North Slope, LLC
GeoTechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
E-mail: kaitlyn.barcelona@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal
Received By: Date:
DATE: 1/17/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
MPU S-19A (PTD 202-233)
Multi-Finger Caliper 1/13/2022
Please include current contact information if different from above.
Received By:
01/21/2022
37'
(6HW
By Abby Bell at 3:54 pm, Jan 21, 2022
Kaitlyn Barcelona Hilcorp North Slope, LLC
GeoTechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
E-mail: kaitlyn.barcelona@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal
Received By: Date:
DATE: 11/15/2021
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL
MPU S-19A (PTD 202-234)
Leak Detect Log 10/19/2021
Please include current contact information if different from above.
37'
(6HW
Received By: d
11/17/2021
By Abby Bell at 4:01 pm, Nov 15, 2021
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 30, 2011 SLMNED FEB 4 ZO IZ'
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission _ 3 3
333 West 7 Avenue �� a
Anchorage, Alaska 99501 M95 1 1" 1
Subject: Corrosion Inhibitor Treatments of MPS -Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
C - -
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
MPS -Pad
10/11/2011
Corrosion
• Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft gal
MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011
MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011
MPS-03 2021460 50029231050000 Open Flutes - Treated
MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-05 2021370 50029231000000 Open Flutes - Treated
MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009
MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011
MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/3/2009
MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011
MPS-11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011
MPS-12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011
MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009
MPS-14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011
MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011
MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 102 7/29/2011
MPS -17 2021730 50029231150000 Open Flutes - Treated
MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011
"',! MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011
MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009
MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 7/28/2011
MPS-23 2021320 50029230980000 Open Flutes - Treated
MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011
MPS -25 2021030 50029230890000 Open Flutes - Treated
MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011
MPS -27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011
MPS-28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7/28/2011
MPS-29 2021950 50029231190000 Open Flutes - Treated
MPS-30 2022360 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011
MPS -31 2020140 50029230660000 Open Flutes - Treated
MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7/28/2011
MPS -33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011
MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011
MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011
MPS-37 2070520 50029233550000 13.9 Need top job NA
MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011
MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA
MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011
MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011
MPSB -04 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011
/ r.il rM... À-~ \
DATA SUBMITTAL COMPLIANCE REPORT
3n /2005
lp ~~¿ ) 'I jUl."- ~ ~
Permit to Drill 2022330
Well Name/No. MILNE PT UNIT SB S-19A
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23121-01-00
MD 1 0200 ~-TVD 4274 / Completion Date 2/1/2003 /
Completion Status 1-01L
Current Status 1-01L
UIC N
-
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey ~
-------~-
DATA INFORMATION
Types Electric or Other Logs Run: MWD, LWD, GR, RES, ABI, IFR\CASANDRA
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Logl Electr
--è~ Interval
Data Digital Dataset Log Log Run OHI -~-
~~_~ed/Frmt Number Name Scale Media No Start Stop CH Received Comments
~ED 0 41515 ...LIS Verifîèâtiôn G (l... ) tv..,¡ t'( 4 I r2... ~ Y' 1 7558 10145 ~ 2/18/2003
~.
.Eö 0 Directional Survey 7787 10143 Open 3/26/2003 PB1
¿.ÆD 0 ~ 516 ~Ll5_Verification G,(L i ~UJ AY,., ~O P 7558 10088 ~ 2/18/2003 PB1
..EÐ 0 Directional Survey 9143 1 0200 Open 3/26/2003
~t Directional Survey 9143 1 0200 Open 3/26/2003 MWD
Œ'pt LIS Verification 7558 1 0088 Case 2/18/2003 PB1
tßpt LIS Verification 7558 10145 Case 2/18/2003
r:: 0 Directional Survey 7787 10143 Open 3/26/2003 PB1 MWD
pt 0 Directional Survey 7787 10143 Open 3/26/2003 PB1 MWD
Rpt Directional Survey 9143 1 0200 Open 3/26/2003
A Directional Survey Log is
required to be submitted.
'~ This record automatically --
created from Permit to Drill
~D Module on: 12/24/2002.
Directional Survey 7787 1 0143 Open 3/26/2003 PB1
~/ Directional Survey 9143 10200 Open 3/26/2003 MWD
(ED C 11799 LIS Verification 1,2,3,4 7558 10152 Open 6/2/2003
\:: C Pdf 11799 Induction/Resistivity 25 Final 7558 1 0200 Open 6/2/2003 MWD-ROP, DGR, EWR-
MD
C Pdf 11799 I nd uction/Resistivity 25 Final 7812 4274 Open 6/2/2003 MWD-DGR, EWR - TVD
/0 C Asc 11822 LIS Verification 1,2,3 7558 10143 Open 6/25/2003
. ED C Pdf 11822 I nd uction/Resistivity 25 Final 7836 10143 Open 6/25/2003 MWD - ROP, DGR - MD
ED C Pdf 11822 I nd uction/Resistivity 5 300 4352 4341 Open 6/25/2003 MWD - DGR - TVD
/-- ------
DATA SUBMITTAL COMPLIANCE REPORT
3n /2005
Permit to Drill 2022330
Well Name/No. MILNE PT UNIT SB S-19A
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23121-01-00
MD 10200
ND 4274
Well Cores/Samples Infonnation:
Name
-'--
ADDITIONAL INFORMATION
Well Cored? Y ®
Chips Received? _~IN----
Analysis
Received?
Y..LN" . -
Comments:
-- -- ----
--- -------
Compliance Reviewed By:
'~""""'"
Completion Date 2/1/2003
Completion Status 1-01L
~
Interval
Start Stop
Sent
Received
Daily History Received?
Formation Tops
Current Status 1-01L
Sample
Set
Number Comments
GIN
GIN
Date:
UIC N
.~
2~ rv~m;-
"-..",..,..--
)
}
¿)O~'-d33
\ \ 3~'~
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7tl1 Avenue, Suite 100
Anchorage, Alaska 99501
June 19, 2003
RE:MWD Fonnation Evaluation Logs: MPS-I9A PBI,
AK-MW-30000800
MPS-I9A PDI:
Digital Log Images:
50-029-23084-70
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Ancl\1otag(;('~âSk~ 99518\
]: \:}~. 1-' \'i,,~ ./" :.¡ I;! ,':\/ " ','" ,:', :.
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
JU~\~ ~~~ [)
¡:;,t,,'" '"
(Dare:
, .; Signed:
..'..... "
':~:::"~,~,,' ....... V\,\ <::::::..
\.............. ,S \.,. ,:::' \ \ \ ...-'
)
)
BOd -~3:3
if Ilt9(
WELL LOG TRANSMI1TAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7tll Avenue, Suite 100
Anchorage, Alaska 99501
June 02, 2003
RE: MWD Formation Evaluation Logs: MPS-19A,
AK-MW-3000800
MPS-19A:
Digital Log Images:
50-029-23121-01
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Dri11ing Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
RECEIVED
D~ðN 0 2 2003
AJ8Ika Oit & Gas Cons. Commieeion
Anchorage
:J-C) ~ -:A ~33
r \1')')
S¡gned:e,-_ Xl. ~
~~'bN"-~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
)
)
23.
CASING
SIZE
1. Status of Well
DI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3308' NSL, 195' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
187' NSL, 925' WEL, SEC. 35, T13N, R1OE, UM, OATarget 1 X = 565022, Y = 6007407 10. Well Number
At total depth
371' NSL, 1029' WEL, SEC. 35, T13N, R10E, UM, OA Target 1 X = 564919, Y = 6007590
11. Field and Pool
5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No. Milne Point Unit I Schrader Bluff
KBE = 72.2' ADL 025518
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
1-19-2003 1-21-2003 ' 2-1-2003 ~
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
10200 4274 FT 10200 4274 FT DI Yes 0 No
22. Type Electric or Other Logs Run
MWD , LWD , GR , RES, ABI, IFR\CASANDRA
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
Surface 112' 42"
29' 2367' 9-/78"
26' 7812' 8-1/211
7766' 9980' 6-1/811
Classification of Service Well
7. Permit Number
202-233 302-365
8. API Number
50- 029-23121-01
, . "',,,",,.,,,,,,,,,, 9. Unit or Lease Name
X = 565816, Y = 5999975 Milne Point Unit
,'~'Ii\\,,'~II"1
: .~.;::X~03¡
',';':'>:~. ¡,
;& '" ,.r
MPS-19A
15. Water depth, if offshore 16. No. of Completions
NIA MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
N/A MD 1800' (Approx.)
-T/'¿J~4J 71/ z f' /?7l>
C¡.3 t./ S / rv2:>
2011
9-5/811
WT. PER FT.
92#
40#
26#
12.6#
GRADE
H-40
L-80
L-80
L-80
CEMENTING RECORD
260 sx Arctic Set (Approx.)
786 sx Class 'L" 225 sx Class 'G'
75 sx Class 'E', 273 sx Class 'G'
Uncemented Slotted Liner
AMOUNT PUllED
711
4-1/211
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/211 Slotted Liner
MD TVD MD TVD
25.
SIZE
4-1/211, 12.6#, L-80
TUBING RECORD
DEPTH SET (MD)
7650'
PACKER SET (MD)
7597'
7836' - 9978'
4353' - 4307'
26. ACID, FRACTURE, CEMENT SaUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
1802' Freeze Protected with 62 Bbls of Diesel
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
March 3, 2003 Flowing
Date of Test Hours Tested PRODUCTION FOR Oll-BBl
3/4/2003 6 TEST PERIOD 2465
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
GAs-McF
542
Oll-BBl
GAs-McF
WATER-BBl
o
WATER-BBl
CHOKE SIZE
GAS-Oil RATIO
220
Oil GRAVITY-API (CORR)
28.
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
¡r"'"'.' . "." ,<.'
, ~"""'5 """""I.:t!,~:.
1 ~
..,,,:?
No core samples were taken.
~\1 r~ b: ~:~
i\:,
,- t-".......,·
~ .d~
(.,:, "
Form 10-407 Rev. 07-01-80 R B OMS BF l
f!~r,r' ,^, ¡
f¡ '; ~\ ': l, ",j';, J'.-. 1
~ """i \ ì \!, ~ \ .._
Gy
L~
Submit In Duplicate
)
)
29. Geologic Markers
Marker Name Measured
Depth
SBF2-NA 7478'
SBF1-NB 7543'
SBE4-NC 7607'
SBE2-NE 7634'
SBE1-NF 7749'
Top of Schrader lOA' 9988'
30.
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
4223'
4245'
4268'
4278'
4321'
4306'
MAR ~~ ()
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys and a Leak-Off Test Summary.
32. I hereby certify that the fo egoing is true ang correct to the best of my knowledge
Signed Sond ,~tewman :~.LQ--r- Title Technical Assistant Date D r:s'~ } q -0/)
M PS-19A 202-233 302-365 Prepared By Name/Number: Sondra Stewman, 564-4750
Well Number Drilling Engineer: Steve Campbell, 564-4401
Permit No. I Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
hEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
. I-
(ìR1G1NAL
Form 10-407 Rev. 07-01-80
)
)
BP
Opera,tiiol'1sSummary Report
Page 1 of 6
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-19
MPS-19
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 1/17/2003
Rig Release: 2/1/2003
Rig Number:
Spud Date: 10/18/2002
End: 2/1/2003
Date From, ",TØ "Hours Task Code NPT" Phase Description of Operations
1/17/2003 00:00 - 03:00 3.00 MOB P PRE Rig Modification, fit auger chutes, patch hole in wall from cut off
conveyor.
03:00 - 04:30 1.50 MOB P PRE Skid rig floor over sub
04:30 - 08:00 3.50 MOB P PRE Prepare rig to move over well
08:00 - 09:30 1.50 MOB P PRE Moving rig over MPS-19a
09:30 - 12:00 2.50 MOB P PRE Spot rig washer, rig up
12:00 - 18:00 6.00 MOB P PRE Skid rig floor, rig up floor and fill pipe shed with drill pipe, PJSM
on nipple down and nipple bops
18:00 - 19:00 1.00 BOPSURP COMP Nipple down tree,remove false hanger, fill rock washer with
water, checking for leaks
19:00 - 21 :00 2.00 BOPSUR P COMP Nipple up 13 3/8 Bop stack, change lower rams to 3.5 X6
bops have 2 7/8 x 5 in top rams, blinds in middle, 3.5 x6 in
lower rams
21 :00 - 22:00 1.00 BOPSUR P COMP Install test plug, rig up for test, PJSM on bop testing
22:00 - 00:00 2.00 BOPSURP COMP Test bops and hydrill 200psi low 4,000 high on bops, hydrill 200
low 2,500 high, fixed to leaks on bottom flange and kill line
Bop test was witness by Iou Grimaldi with AOGCC
1/18/2003 00:00 - 03:00 3.00 BOPSUR P COMP Test bops and hydrill200psi low 4,000 high on bops, hydrill200
low 2,500 high, fixed to leaks on bottom flange and kill line
Bop test was witness by Iou Grimaldi with AOGCC
03:00 - 03:30 0.50 BOPSUR P COMP Install wear ring, lay down test jt,
03:30 - 05:30 2.00 CLEAN P COMP Pick up Hughes AT J-11 6.125 bit and bit sub, 3.5 15.5 S-135
pipe. to 2,000 ft.
05:30 - 06:30 1.00 CLEAN P COMP Displace diesel out of well, with water
06:30 - 09:00 2.50 CLEAN P COMP Pick up 3.515.50 S135 drill pipe total 189 jts
09:00 - 10:00 1.00 CLEAN P COMP Cut drilling line, service top drive
10:00 -11 :30 1.50 CLEAN P COMP Tripping out wi 3.5 15.50 pipe, standing in derrick
11 :30 -19:00 7.50 CLEAN P COMP P/U bit AT J-11, MWD/GR 12 dc, 15 hw. Picking up 3.5 13#
S-135 pipe 144 jts
19:00 - 21:00 2.00 CLEAN P COMP Tripping in with 3.5 out of derrick
21 :00 - 21 :30 0.50 CLEAN P COMP Break circ wash to float collar, Tag up on float collar@ 8038,
set down 30,000# wt
21 :30 - 23:00 1.50 CLEAN P COMP Ready pits, and rock washer, take fluid out of pit #1
23:00 - 00:00 1.00 CLEAN P COMP Displace well bore with 9.2 flow-pro with 250 gals min. 1800 psi
P/U 127,000 S/O 95,000 RIT 110,000 50 rpm TQ 5,000
1/19/2003 00:00 - 01 :00 1.00 CLEAN P COMP Test csg to 3,500 psi for 30 min
01 :00 - 04:00 3.00 EVAL P COMP MAD pass from 7980 to 7500 for tie end, top of O-A 7812
04:00 - 06:30 2.50 DRILL P PROD1 POH for whip stock. lay down MWD
06:30 - 08:30 2.00 DRILL P PROD1 Pick up 3.5 space out jts., whipstock, mills,mwd,orient
08:30 - 11 :00 2.50 DRILL P PROD1 RIH with whipstock
11 :00 - 11 :30 0.50 DRILL P PROD1 Orient to 10 degrees to the left and set whipstock
11:30 -15:00 3.50 DRILL P PROD1 Mill window From 7812 to 7824, Drll to 7835 qA
15:00 - 16:30 1.50 DRILL P PROD1 Circ two bottoms up, with 280 gals min 2080 psi
16:30 -17:00 0.50 DRILL P PROD1 FIT test with 440 psi, 9.1 mud wt 4341 tvd= 11.0 EMW
17:00 - 17:30 0.50 DRILL P PROD1 Flow check and rig down test eqipment, pump slug
17:30 - 19:30 2.00 DRILL P PROD1 Trip out to bha
19:30 - 20:30 1.00 DRILL P PROD1 Stand back Bha, lay down mills
20:30 - 22:30 2.00 DRILL P PROD1 Pick up Bha #2 Fm2643 wI 3x12,4 3/4 sperry drill motor 1.50
bend,float sub,4 3/4 GRlRES, 4 3/4 DM,hang off sub,3 flex
dC,jars
22:30 - 00:00 1.50 DRILL P PROD1 RIH fill pipe every 25 sds.
1120/2003 00:00 - 01 :00 1.00 DRILL P PROD1 Tripping in to 7769
01 :00 - 02:00 1.00 DRILL P PROD1 Service top drive, cut drill line
Printed: 21312003 12:33:46 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
1/20/2003
1/21/2003
1/22/2003
')
)
j
BP
Operations Summary Report
Page 2 of6
MPS-19
MPS-19
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
From - To Hours Task Code NPT Phase
02:00 - 02:30
02:30 - 23:00
23:00 - 00:00
00:00 - 01 :00
01 :00 - 15:00
15:00 - 15:30
15:30 - 16:00
16:00 - 16:30
16:30 - 19:00
19:00 - 21 :00
21 :00 - 21 :30
21 :30 - 23:30
23:30 - 00:00
00:00 - 01 :00
01 :00 - 01 :30
01 :30 - 03:00
03:00 - 05:30
05:30 - 07:00
07:00 - 11 :30
11 :30 -12:00
12:00 - 12:30
12:30 - 13:00
13:00 - 14:30
14:30 - 18:00
18:00 -19:30
19:30 - 20:30
0.50 DRILL P
20.50 DRILL P
1.00 DRILL P
1.00 STKOH N
14.00 STKOH N
0.50 STKOH N
0.50 STKOH N
0.50 STKOH N
2.50 STKOH P
2.00 STKOH P
0.50 STKOH P
2.00 STKOH P
0.50 STKOH P
1.00 STKOH P
0.50 CASE P
1.50 CASE P
2.50 CASE P
1.50 CASE P
4.50 CASE P
0.50 CASE P
0.50 CASE P
0.50 CASE N
1.50 CASE N
3.50 CASE N
1.50 CASE N
1.00 CASE N
PROD1
PROD1
PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
DPRB PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
COMP
COMP
COMP
COMP
COMP
COMP
COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
Start: 1/17/2003
Rig Release: 2/1/2003
Rig Number:
Spud Date: 10/18/2002
End: 2/1/2003
Description of Operations
Orient motor slide thru window 7812 to 7824
Directional Drill 7835 to 10143 with 250 gals min. 2850 psi 80
rpms 5-10K bit wt., Went out the bottom of O-A sand @ 9970
TVD 4,228 @ 87 degrees, drilled to 10143 to make sure.
AST 4.0 ART 9 on bottom tq 4,000 off bottom 3.500 P/U
115,000 S/O 81,000 RIT 98,000
Circ bottoms up, for open hole side track @ 9,174
Pump out of Hole from 10,143' to 9,164' to proceed wI Open
Hole Sidetrack.
Sidetrack by Time Drilling from 9174' to 9198'. Continue
Directional Drilling from 9198' to 10,200'. Geologist determined
that we Side Tracked out of Target Sand @ 9965'.
Drilled wI 250 GPM @ 3040 psi., TQ = 4.5K
PUW = 11 OK, SOW = 77K, ROlW = 95K.
AST = 5 Hrs. ART = 5.25 Hrs.
CBU wI 250 GPM @ 2900 psi.
POH to 9630' in preparation for OH Sidetrack.
RIH to 10,090'.
Circulate 3 Bottoms up wI 280 GPM @ 3080 psi.
Pump out of Hole from 10,090' to 7870' - No Drag - Hole in
good condition. POH, w/o Pumps from 7870' to 7760'. No
Problems with Window.
Flow Check Well - Pump Slug.
POH from 7760' to BHA.
Flow Check - Flush BHA wI 5 Bbls. water.
UD BHA #2
PJSM with all Hands, RIU to Run Liner
Run 4.5" Liner. Total 52 Slotted Jts + 1 Solid Jt.. M/U
Hanger/Packer Assy.
RIH wI Liner on 3.5" DP to 9970' - Top of Liner @ 7762'.
Pick Up Wt = 123K, Slack Off Wt = 90K
Drop Setting Ball & Pump Down. Pressure to 2500 psi to set
Baker "HMC' Liner Hanger. Verify Set with 20K Down Weight.
Shear ball seat wI 3700 psi. Rotate setting tool off Packer and
attempt to set 15K down weight on "ZXP" Packer to confirm
Set. - Liner Assembly moving down Hole. Keep moving down
1 0 ft to 9980' ( TOL @ 7772'). Only 5K down moves Liner.
Slips not Set.
POH - SLM, No Correction
UD Running Tool- Looks OK.
Lubricate Rig.
M/U Liner Stacker/Packer Assy. wI 6' Tie Back Sleeve & 10'
Pup Jt wI WLEG on bottom.
RIH wI Hanger Assy on 3.5" DP. Set down 20K @ 2056'. P/U
Free. Set down again and pulled up Free. Notify Co. Rep.
Co.Rep had driller set down w/1 OK. - Same spot. P/U 30K
Over string wt. - Stuck.
Evaluate situation and altematives with BP & Baker, Mgmt.
Engineers and Operations personnel.
Pull on Packer Assy. wI 130K Max ( at Tool). Work several
times. No Success. Drop Ball and complete setting Process.
POH UD Running tool. OK. No Anomalies
Printed: 2/312003 12:33:46 PM
)
)
)
BP
Operéltions, Summary Rellort
Page 3 of6
Legal Well Name: MPS-19
Common Well Name: MPS-19 Spud Date: 10/18/2002
Event Name: DRILL +COMPLETE Start: 1/17/2003 End: 2/1/2003
Contractor Name: DOYON DRILLING INC. Rig Release: 2/1/2003
Rig Name: DOYON 14 Rig Number:
Date From -To Hours Task Code NPT Phase
1/22/2003 20:30 - 21 :30 1.00 FISH N DFAL COMP P/U Baker Milling Tools to Rig Floor. PJSM WI all hands.
21 :30 - 23:00 1.50 FISH N DFAL COMP M/U Milling BHA & RIH to 2038' Tag TOL.
23:00 - 00:00 1.00 FISH N DFAL COMP Mill Tie Back receptacle from 2038' to 2045'. Pump @ 230
GPM & 520 psi. RPM = 80 to 100, 20K to 25K Weight on Mill.
1/23/2003 00:00 - 03:00 3.00 FISH N DFAL COMP Mill Packer from 2045' to 2055' Pump 230 GPM @ 530 psi.
Rotate 80 to 100 RPM. 20K to 25K Weight on Mill. Packer
Free. Push downhole to 2191'
03:00 - 03:30 0.50 FISH N DFAL COMP Circulate Hole Clean - 420 GPM @ 1050 psi.
03:30 - 04:30 1.00 FISH N DFAL COMP POH. UD Mill & Junk Baskets.
04:30 - 05:30 1.00 FISH N DFAL COMP Flush Stack. M/U Spear Assy.
05:30 - 07:30 2.00 FISH N DFAL COMP RIH wI Spear. Tag up on Fish @ 2191'. Continue RIH to 4106'
Taking no weight to push Fish Downhole.
07:30 - 09:00 1.50 FISH N DFAL COMP POH - No Fish on Spear.
09:00 - 11 :30 2.50 FISH N DFAL COMP RIH Push Fish to Lower Packer @ 7772'.
11 :30 -12:00 0.50 FISH N DFAL COMP Engage Fish w/ Spear stacking 30K Lbs on Packer.
Pick up Wt = 119K, Slack off Wt = 95K
12:00 - 12:30 0.50 FISH N DFAL COMP PJSM on POH wI Fish. Pump Slug.
12:30 - 23:30 11.00 FISH N DFAL COMP POH wI Fish. Fish catching on all Casing couplings. Having to
work through pumping out & wI left hand rotation to 5800'.
Pulled dry wI no hang-ups from 5000' to surface.
NO Fish on Spear. Grapple in release position wI dulled
blades.
23:30 - 00:00 0.50 FISH P COMP Service I Lubricate Top Drive
1/24/2003 00:00 - 02:00 2.00 FISH N DFAL COMP P/U & MIU Packer Mill BHA.
02:00 - 05:00 3.00 FISH N DFAL COMP RIH - Tag Fish @ 4840'. Push Fish to Bottom. TOF @ 7767'.
05:00 - 06:00 1.00 FISH N DFAL COMP Circulate Hole Clean 3 X Bottoms Up - 400 GPM & 120 RPM.
06:00 - 06:30 0.50 FISH N DFAL COMP POH to 5800'
06:30 - 07:30 1.00 FISH P COMP Slip & Cut Drilling Line, Service Top Drive.
07:30 - 09:00 1.50 FISH N DFAL COMP POH to BHA
09:00 - 09:30 0.50 FISH N DFAL COMP Empty Junk Baskets Recovered 8 very small pieces of junk
out of two boot baskets - negligible recovery. UD Baker Mill &
Tools.
09:30 - 12:30 3.00 STWHIP P PROD2 P/U & M/U Retrievable, 5.5", Whipstock BHA, Orient, Up Load
MWD, Shallow Test.
12:30 - 18:00 5.50 STWHIP P PROD2 RIH wI Whipstock to 7636'
18:00 - 18:30 0.50 STWHIP P PROD2 Break circulation. Orient Tool Face 7 Deg. Left of High Side.
P/U Wt. = 118K S/O Wt. = 93K.
18:30 - 19:00 0.50 STWHIP P PROD2 RIH Tag TOF @ 7767'. Set 18K Down to set Anchor, Increase
to 20K. P/U 5K over to confirm - OK. Set 35K down to shear
release bolt.
19:00 - 00:00 5.00 STWHIP P PROD2 Mill Window from 7691' to 7703'. Drill to 7714' to ensure String I 'fll,
Mills through window. Milling wI 250 GPM @ 1600 psi.
60 to 120 RPM, 2K to 9K Wt. on Mill. Torque = 4K to 8K.
Worked through Window without pump - OK
1/25/2003 00:00 - 01 :30 1.50 STWHIP P PROD2 Circulate Wellbore Clean 3 X btms up - @ 280 GPM - 1800 psi.
01 :30 - 03:30 2.00 STWHIP P PROD2 POH. Stand Back HWDP & De's.
03:30 - 04:00 0.50 STWHIP P PROD2 UD Window Milling BHA.
04:00 - 04:30 0.50 STWHIP P PROD2 Function rams & Flush BOP.
04:30 - 05:00 0.50 STWHIP P PROD2 RIU to Test BOPE. Pull Wear Bushing. Run Test Plug.
05:00 - 09:00 4.00 STWHIP P PROD2 Test BOPE to 250 psi. Low 14000 psi. High. Annular to 250
Low /2500 High. Upper IBOP Valve on Top Drive & Valve # 12
Printed: 21312003 12:33:46 PM
}
)
BP
Operations Summary Report
Page 4of6
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-19
MPS-19
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 1/17/2003
Rig Release: 2/1/2003
Rig Number:
Spud Date: 10/18/2002
End: 2/1/2003
Date Frorn~To Hours Tàsk Code NPT Phase Description of Operations
1/25/2003 05:00 - 09:00 4.00 STWHIP P PROD2 on Choke Manifold Failed.
09:00 - 15:30 6.50 STWHIP N RREP PROD2 Replace IBOP on Top Drive & Repair Valve # 12 on Choke
Manifold. Retest both to 250 14000 psi. - OK. Witness of BOP
Test waived by John Spaulding, AOGCC.
15:30 - 16:30 1.00 STWHIP P PROD2 M/U Kick Off BHA, RIH to 230' & surface Test MWD - OK.
16:30 - 20:00 3.50 STWHIP P PROD2 RIH to 7615' , picking up 39 jts 3.5" Doyon Rental DP & Filling
pipe every 25 stands.
20:00 - 20:30 0.50 DRILL P PROD2 Orient Motor to 7 deg. L of HIS, turn off pumps and slide
through window @ 7691' - 7703', Wash to 7714.
20:30 - 00:00 3.50 DRILL P PROD2 Orient & Directional Drill from 7714' to 7880'.250 GPM @ 2460
psi. Torque = 5K RPM = 40 P/U = 11 OK, S/O = 85K, ROT =
100K. AST = 2.15 Hrs. ART = .08 Hrs.
1/26/2003 00:00 - 11 :30 11.50 DRILL P PROD2 Directional drill 6 1/8" Hole from 7880' to 8731'.
250 GPM @ 2600 psi. TO = 5K RPM = 30 to 40
P/U = 11 OK, SIO = 80K, ROT = 100K
AST = 6.25 Hrs. ART = 1.25 Hrs.
Majority of build & turn made - Pull out for 1.5 Deg. Motor.
11 :30 - 12:30 1.00 DRILL P PROD2 Circulate 2 X Btms Up @ 250 GPM - 2400 psi & 30 RPM.
12:30 - 13:30 1.00 DRILL P PROD2 Pump out of Hole to 7800'. Turn off pumps & pull above
window.
13:30 - 14:00 0.50 DRILL P PROD2 Flow Check - OK. Pump Slug.
14:00 - 16:30 2.50 DRILL P PROD2 POH wi DP.
16:30 - 17:00 0.50 DRILL P PROD2 Stand Back BHA. Adjust Motor from 1.83 Deg. to 1.5 Deg.
17:00 - 17:30 0.50 DRILL P PROD2 Down Load then Up Load MWD/LWD.
17:30 - 18:00 0.50 DRILL P PROD2 M/U & RIH wi BHA to 300'. Test MWD - OK.
18:00 - 20:30 2.50 DRILL P PROD2 RIH to 7600', filling pipe every 25 stands.
20:30 - 21 :30 1.00 DRILL P PROD2 Slip & Cut Drilling Line, Service Top Drive.
21 :30 - 22:00 0.50 DRILL P PROD2 Orient Motor to High Side, Slide through Window an on to
8670'. Wash last stand to bottom @ 8731'.
22:00 - 00:00 2.00 DRILL P PROD2 Directional drill 6 1/8" Hole from 8731' to 8870'
255 GPM @ 2660 psi. TO = 5K, RPM = 80
P/U = 113K, S/O = 85K, ROT = 100K
AST = 0.62 Hrs. ART = 0.25 Hrs.
1/27/2003 00:00 - 00:00 24.00 DRILL P PROD2 Directional Drill from 8,870' to 10,309'. 255 GPM @ 2760 psi.
P/U = 120K, SIO = 75K, ROT = 105K RPM = 80 TO = 5K
AST = 7.75 Hrs, ART = 7.25 Hrs.
Sliding Difficult. Keeping toolface hampered by severe dog legs
and exposed shale. Inceased lubricants from 2% to 3% to aid
in sliding.
1/28/2003 00:00 - 16:00 16.00 DRILL P PROD2 Directional Drill from 10,309' to 11,630'.255 GPM @ 3160 psi.
TO on Btm = 8K ROT @ 80 RPM Drilling - 100 RPM Reaming.
P/U = 125K, SIO = 60K, ROT = 105K
AST = 2.25 Hrs. ART = 7 Hrs.
Topped Out in OA Sands @ 11,567' per Geologist.
Drilled Total 3100' Pay in OA Interval.
16:00 -18:00 2.00 CASE P COMP Circulate 3 X Bottoms Up. 100 RPM, 280 GPM @ 3500 psi.
18:00 - 22:30 4.50 CASE P COMP Pump out of Hole from 11,630' to 7,802' with no problems nor
excess drag. Turned off pumps and pulled dry - pulled 35K to
50K over from 7770' to 7740'. Go back down to 7770' and
pump out to 7720'. Turn off pumps and pull through Window at
7703' to 7691' up to 7630' with no problem.
Printed: 21312003 12:33:46 PM
') )
BP Page 50f6
Operations Summary Report
Legal Well Name: MPS-19
Common Well Name: MPS-19 Spud Date: 10/18/2002
Event Name: DRILL +COMPLETE Start: 1/17/2003 End: 2/1/2003
Contractor Name: DOYON DRILLING INC. Rig Release: 2/1/2003
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Task Code NPT Phase Description ()fOperations
1/28/2003 22:30 - 23:00 0.50 CASE P COMP Observe Wellbore - Static. Pump Dry Job.
23:00 - 00:00 1.00 CASE P COMP POH wI DP.
1/29/2003 00:00 - 02:00 2.00 CASE P COMP POH wI 3.5" DP
02:00 - 02:30 0.50 CASE P COMP UD NIM Flex Collars, Motor & MWD.
02:30 - 03:00 0.50 CASE P COMP P/U & M/U 61/8" Porcupine Hole Opener Assy.
03:00 - 05:30 2.50 CASE P COMP RIH, filling pipe every 25 stands to 7680'.
05:30 - 07:00 1.50 CASE P COMP Slip & Cut Drilling line. Service Top Drive.
07:00 - 10:00 3.00 CASE P COMP Ream from 7714' to end of severe turn & dog leg interval @
8962'. Ream @ 255 GPM & 100 RPM.
10:00 - 11 :00 1.00 CASE P COMP RIH to 11563' - No Obstructions. Wash & ream to bottom @
11630'.
11 :00 - 13:30 2.50 CASE P COMP Circulate 3 X Bottoms up - Wellbore clean. 265 GPM
Reciprocating @ 100 RPM.
13:30 - 17:30 4.00 CASE P COMP Pump out of Hole from 11,630' to 7720'. pulled 25K over from
7780' to 7750'. Ream down & pull back up - No Drag.
17:30 - 18:30 1.00 CASE P COMP Pull above Window & CBU @ 275 GPM & 120 RPM. Pump Dry
Job.
18:30 - 21 :00 2.50 CASE P COMP POH wI DP.
21 :00 - 22:00 1.00 CASE P COMP Break out & Lay Down Hole Opener BHA
22:00 - 23:30 1.50 CASE P COMP P/U & MU Whipstock Retrieval Tool Assy.BHA. Upload & orient
MWD.
23:30 - 00:00 0.50 CASE P COMP RIH wI Drill Collars from Derrick.
1/30/2003 00:00 - 00:30 0.50 CASE P COMP Complete RIH wI BHA. Pump and test MWD - OK
00:30 - 03:00 2.50 CASE P COMP RIH to 7658'
03:00 - 03:30 0.50 CASE P COMP Orient Tool & Latch into Whipstock @ 7696'. Pull free with 75K
Over
03:30 - 06:00 2.50 CASE P COMP POH wI Whipstock. Found thin concave disk of steel between
the Retrieving tool & the Whipstock.
06:00 - 07:30 1.50 CASE P COMP UD WIS retrieval assy. Clear & Clean floor.
07:30 - 08:00 0.50 CASE P COMP RIU to run Liner.
08:00 - 08:30 0.50 CASE P COMP PJSM with all Hands.
08:30 - 12:30 4.00 CASE P COMP Run 4.5",12.6#, L-80, IBT-m Slotted Liner as per Program
12:30 - 13:00 0.50 CASE P COMP M/U Hook Hanger Assembly.
13:00 -17:00 4.00 CASE P COMP RIH wI 4.5" Liner on 3.5" DP. Work Liner through Window - no
problems. Continue running until Hanger just above window @
7691'.
17:00 - 20:00 3.00 CASE P COMP Attempt to latch Hook in window, utilizing swivel to turn Hook
Assy. finally turned complete string and were able to Latch.
Worked three times - latched same place every time. TOL
inside of casing @ 7681'.
20:00 - 21 :00 1.00 CASE P COMP Drop Ball & pressure up to 2900 psi to release from Hanger.
P/U to verify. Pressure up to 4000 psi to shear ball into catcher
sub.
21 :00 - 23:00 2.00 CASE P COMP POH wI Running Tool.
23:00 - 23:30 0.50 CASE P COMP UD running tool, MIU Gauge I Junk Mill BHA.
23:30 - 00:00 0.50 CASE P COMP RIH
1/31/2003 00:00 - 01 :30 1.50 CASE P COMP RIH wI Gauge I Mill Assy. to 7623'.
01 :30 - 02:30 1.00 CASE P COMP Slip & Cut Drilling Line. Service Top Drive
02:30 - 05:00 2.50 CASE P COMP Displace Mud wI 265 Bbls. 8.8 ppg. brine, then 30 Bbl. Hi-Vis
Sweep, 150 Bbls. 8.8 ppg. Brine followed by 445 BBls. 9.2 ppg.
NaCI. Pumped @ 350 GPM, Reciprocating @ 120 RPM
05:00 - 14:00 9.00 CASE P COMP POH UD all DP. RIH wI DP in Derrick, POH UD.
Printed: 21312003 12:33:46 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
')
)
Page 6 of6
BP
Operations SummaryA.fi!port
MPS-19
MPS-19
DRILL +COMPLETE
DOYON DRILLING INC.
DOYON 14
Start: 1/17/2003
Rig Release: 2/1/2003
Rig Number:
Spud Date: 10/18/2002
End: 2/1/2003
Date
From - To Hours Task Code NPT Phase
Description at Operations
1/31/2003
14:00 - 16:00
16:00 - 16:30
16:30 - 00:00
2.00 RUNCOfIfP
0.50 RUNCOfIfP
7.50 RUNCOfIfP
COMP
COMP
COMP
2/1/2003 00:00 - 03:00 3.00 RUNCOfIfP COMP
03:00 - 06:00 3.00 RUNCOfIfP COMP
06:00 - 07:30 1.50 CHEM P COMP
07:30 - 09:30 2.00 RUNCOfIfP COMP
09:30 - 10:30 1.00 WHSUR P COMP
10:30 - 11 :30 1.00 RIGD P COMP
11 :30 - 12:00 0.50 WHSUR P COMP
12:00 - 13:30 1.50 WHSUR P COMP
13:30 - 14:30 1.00 WHSUR P COMP
14:30 - 15:30 1.00 WHSUR P COMP
15:30 - 18:00 2.50 WHSUR P COMP
18:00 - 19:00
19:00 - 20:00
1.00 WHSUR P
1.00 RIGD P
COMP
COMP
Pull Wear Ring. RIU to Run 4.5" Completion.
PJSM with Crew & all Service Co. personnel.
Run 4.5" Completion String as per program. Make up 5 Lower
Tool Assemblies. Hook up 1- Wire to Phoenix sensor. Run 6
Jts. and gather all hands at Drillers console - Every one
comfortable with operation - Proceed.
RIH w/4.5" Completion Tubing. Total-184 Jts. + Tools.
MIU Tubing Hanger and Orient. M/U Landing Jt. Insert I-Wire &
Penetrator into Tubing Head. Test line integrity - OK. Land
Tubing Hanger. R.I.L.D.S. WLEG @ 7650'.
Reverse Circulate corrosion inhibited, 9.2 ppg. Brine spotting in
annulus between GLM & Packer.
Drop Ball-Rod. Check seat wI 500 psi. Pressure up to 2500 to
set Packer then increase to 4000 psi. Hold 4000 psi & Chart for
30 minute test. Bleed Tubing to 2500 psi. Pressure Annulus to
4500 psi. Hold & Chart for 30 minute test. Bleed Annulus to "0",
Then bleed Tubing to "0". Pressure Annulus to 2300 psi to
shear RP Valve.
UD Landing Jt. Dry Rod in TWC. Test to 1000 psi from below.
N/D BOPE. Stand Stack back in Sub.
Test "I" Wire Hanger penetrator connection & Install Rotating
Adapter Seal.
N/U Adapter Flange & Tree.
Test" I " Wire. Test Adapter Flange & Tree to 5000 psi.
RIU DSM Lubricator & Pull TWC.
PJSM wI all Hands. RIU Hot Oil & Test Lines to 3000 psi.
Reverse circulate 62 Bbls. Diesel down annulus holding 300
psi. back pressure on Tubing after Diesel turned corner.
Pumped total 62 Bbls. Allow to "U" Tube - Annulus & Tubing
Freeze Protected to 1802'.
Install BPV wI DSM Lubricator. Test from below to 1000 psi.
Suck out Cellar & Secure Well.
RIG RELEASED @ 20:00 HRS, 1 FEB. 2003
Printed: 21312003 12:33:46 PM
Legal Name: MPS-19
Common Name: MPS-19
Test Date
10/20/2002
1/19/2003
FIT
FIT
Test Type
Test Depth (TMD)
2,672.0 (ft)
7,835.0 (ft)
Sf>
Leê:lk"Qfftest .Surnmary
Test DE!Pth (TVD)
2,326.0 (ft)
4,341.0 (ft)
AMW
9.20 (ppg)
9.10 (ppg)
Surface Pressure
245 (psi)
440 (psi)
Leak Off pressurf) (Bt-IP)
1,357 (psi)
2,492 (psi)
Page tof 1
EMW
11.23 (ppg)
11.05 (ppg)
----
-"-"
Printed: 2/3/2003 12:33:28 PM
)
)
04-Mar-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-19A
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 9,143.97' MD
Window / Kickoff Survey: 9,186.72' MD (if applicable)
Projected Survey: 10,200.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
Attachment(s)
MAR 26 2003
Alaeka œ & Gas Cons. Commisaion
Anctrtnge
C;;; 0."'1 . ,-=--) ,"2, ,.)
,,-~c;:;r"_)".)
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-19A
......~,/
Job No. AKZZ30008,
Survey Report
21 February, 2003
Your Ref: API 500292308401
Surface Coordinates: 5999975.31 N, 565816.06 E (70024' 37.3482" N, 149027' 50.6759" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
'~~-
Surface Coordinates relative to Project H Reference: 999975.31 N, 65816.06 E (Grid)
Surface Coordinates relative to Structure: 4.97 N, 528.92 W(True)
Kelly Bushing: 72.20ft above Mean Sea Level
Elevation relative to Project V Reference: 72.20ft
Elevation relative to Structure: 72.20ft
spe""I'\I-5UI!
DRI L-LING seRv~c: es
A Halliburton Company
Survey Ref: svy1120
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19A
Your Ref: API 500292308401
Job No. AKZZ3000B,
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9143.97 91.790 325.970 4261.16 4333.36 6703.82 N 316.71 W 6006676.08 N 565440.29 E 6656.97 Tie On Point
9186.72 90.430 326.500 4260.34 4332.54 6739.35 N 340.46 W 6006711.40 N 565416.22 E 3.414 6696.08 Window Point
9237.02 90.310 328.240 4260.01 4332.21 6781.71 N 367.58 W 6006753.52 N 565388.73 E 3.467 6742.51
9279.18 91.170 332.250 4259.47 4331.67 6818.30 N 388.50 W 6006789.92 N 565367.49 E 9.727 6782.18
9328.62 92.040 333.600 4258.08 4330.28 6862.30 N 410.99 W 6006833.72 N 565344.61 E 3.248 6829.42
9372.94 91.360 332.740 4256.77 4328.97 6901.83 N 430.99 W 6006873.08 N 565324.27 E 2.473 6871.82 ~
9419.22 92.470 333.260 4255.22 4327.42 6943.04 N 451.99 W 6006914.10 N 565302.91 E 2.648 6916.05
9466.09 92.350 332.630 4253.25 4325.45 6984.75 N 473.29 W 6006955.62 N 565281.24 E 1.367 6960.82
9517.83 90.680 331.880 4251.88 4324.08 7030.52 N 497.36 W 6007001.18 N 565256.76 E 3.538 7010.08
9559.72 90.740 332.060 4251.36 4323.56 7067.50 N 517.05 W 6007037.97 N 565236.75 E 0.453 7049.91
9610.71 91.050 330.990 4250.57 4322.77 7112.31 N 541.36 W 6007082.57 N 565212.05 E 2.184 7098.26
9651 .48 91.230 330.600 4249.75 4321.95 7147.89 N 561.24 W 6007117.98 N 565191.85 E 1.053 7136.76
9702.80 92.280 330.170 4248.18 4320.38 7192.49 N 586.59 W 6007162.35 N 565166.11 E 2.211 7185.08
9745.32 92.220 329.800 4246.51 4318.71 7229.27 N 607.85 W 6007198.95 N 565144.53 E 0.881 7225.00
9793.05 92.350 329.710 4244.61 4316.81 7270.47 N 631.87W 6007239.93 N 565120.15 E 0.331 7269.74
9838.41 93.030 330.120 4242.48 4314.68 7309.68 N 654.58 W 6007278.94 N 565097.09 E 1.750 7312.30
9889.65 93.330 329.860 4239.64 4311.84 7353.98 N 680.17 W 6007323.01 N 565071.11 E 0.774 7360.37
9931.59 93.210 330.350 4237.25 4309.45 7390.28 N 701.04 W 6007359.13 N 565049.92 E 1.201 7399.74
9977.06 93.700 330.700 4234.51 4306.71 7429.80 N 723.37 W 6007398.44 N 565027.24 E 1.323 7442.53
10024.80 94.570 330.770 4231.06 4303.26 7471.33 N 746.65 W 6007439.77 N 565003.60 E 1.828 7487.48
10078.52 96.500 330.960 4225.88 4298.08 7518.04 N 772.68 W 6007486.24 N 564977.16 E 3.610 7537.99
10116.77 101.440 331.560 4219.92 4292.12 7551.15 N 790.84 W 6007519.20 N 564958.71 E 13.008 7573.76
10132.26 102.760 331 .370 4216.67 4288.87 7564.46 N 798.08 W 6007532.44 N 564951.36 E 8.606 7588.12 '-.~'
10200.00 102.760 331.370 4201.71 4273.91 7622.45 N 829.73 W 6007590.15 N 564919.19 E 0.000 7650.73 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 350.000° (True).
Magnetic Declination at Surface is 25.622°(17-Jan-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of10200.00ft.,
The Bottom Hole Displacement is 7667.47ft., in the Direction of 353.788° (True).
21 February, 2003 - 17:58
Page2of3
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19A
Your Ref: API 500292308401
Job No. AKZZ3000B,
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
9143.97
9186.72
10200.00
4333.36
4332.54
4273.91
6703.82 N
6739.35 N
7622.45 N
316.71 W
340.46 W
829.73 W
Tie On Point
Window Point
Projected Survey
-'
Survey tool proqram for MPS-19A
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
176.00
0.00 176.00
176.00 10200.00
176.00 Tolerable Gyro(MPS-19)
4273.91 AK-6 BP _IFR-AK(MPS~19)
'---
21 February, 2003 - 17:58
Page 3 of 3
DrillQuest 3.03.02.002
)
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-19A MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 9,143.97' MD
Window / Kickoff Survey: 9,186.72' MD (if applicable)
Projected Survey: 10,200.00 I MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
)
"""::>7\
~ Da'~J ,,)3
04-Mar-03
RECEIVED
MAR 2 6 2003
Ala. Oil & Gas Cons Co '.
AnchOflg~ mm¡S8íOn
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-19A MWD
~'
Job No. AKMW30008,
Survey Report
21 February, 2003
Your Ref: API 500292312101
Surface Coordinates: 5999975.31 N, 565816.06 E (70024' 37.3482" N, 149027' 50.6759" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
--
Surface Coordinates relative to Project H Reference: 999975.31 N, 65816.06 E (Grid)
Surface Coordinates relative to Structure: 4.97 N, 528.92 W(True)
Kelly Bushing: 72.20ft above Mean Sea Level
Elevation relative to Project V Reference: 72.20ft
Elevation relative to Structure: 72.20ft
spe""''''''y-5UI!
DRiLL"ING" SERVices
A Halliburton Company
Survey Ref: svy1123
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19A MWD
Your Ref: API 500292312101
Job No. AKMW3000B,
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) C/100ft)
9143.97 91.790 326.460 4261.16 4333.36 6719.60 N 294.85 W 6006692.05 N 565462.00 E 6668.72 Tie On Point
9186.72 90.430 325.760 4260.34 4332.54 6755.08 N 318.69 W 6006727.32 N 565437.86 E 3.578 6707.80 Window Point
9237.02 90.310 329.300 4260.01 4332.21 6797.51 N 345.68 W 6006769.51 N 565410.49 E 7.042 6754.27
9279.18 91.170 333.200 4259.47 4331.67 6834.46 N 365.96 W 6006806.28 N 565389.89 E 9.472 6794.18
9328.62 92.040 335.830 4258.08 4330.28 6879.07 N 387.22 W 6006850.70 N 565368.24 E 5.601 6841.80
9372.94 91.360 334.480 4256.77 4328.97 6919.27 N 405.83 W 6006890.73 N 565349.27 E 3.409 6884.62 --/
9419.22 92.470 334.690 4255.22 4327.42 6961.05 N 425.68 W 6006932.34 N 565329.05 E 2.441 6929.21
9466.09 92.350 332.650 4253.25 4325.45 7003.01 N 446.45 W 6006974.12 N 565307.91 E 4.356 6974.15
9517.83 90.680 332.630 4251.88 4324.08 7048.95 N 470.22 W 6007019.84 N 565283.74 E 3.228 7023.51
9559.72 90.740 333.040 4251.36 4323.56 7086.22 N 489.35 W 6007056.94 N 565264.29 E 0.989 7063.53
9610.71 91 .050 331.690 4250.57 4322.77 7131.38 N 512.99 W 6007101.89 N 565240.24 E 2.716 7112.12
9651 .48 91.230 331 .860 4249.75 4321.95 7167.30 N 532.27 W 6007137.64 N 565220.65 E 0.607 7150.84
9702.80 92.280 330.650 4248.18 4320.38 7212.27 N 556.94 W 6007182.39 N 565195.59 E 3.121 7199.41
9745.32 92.220 331.350 4246.51 4318.71 7249.43 N 577.54 W 6007219.37 N 565174.66 E 1.651 7239.58
9793.05 92.350 330.080 4244.61 4316.81 7291.03 N 600.87 W 6007260.76 N 565150.97 E 2.673 7284.60
9838.41 93.030 330.900 4242.48 4314.68 7330.46 N 623.18 W 6007299.99 N 565128.30 E 2.347 7327.31
9889.65 93.330 329.740 4239.64 4311.84 7374.91 N 648.52 W 6007344.22 N 565102.58 E 2.335 7375.48
9931.59 93.210 330.750 4237.25 4309.45 7411.26 N 669.30 W 6007380.38 N 565081.48 E 2.421 7414.89
9977.06 93.700 330.670 4234.51 4306.71 7450.84 N 691.50 W 6007419.77 N 565058.93 E 1.092 7457.72
10024.80 94.570 331 .290 4231.06 4303.26 7492.48 N 714.60 W 6007461.20 N 565035.46 E 2.236 7502.74
10078.52 96.500 332.430 4225.88 4298.08 7539.62 N 739.82 W 6007508.12 N 565009.83 E 4.168 7553.55
10116.77 101 .440 331 .460 4219.92 4292.12 7572.96 N 757.58 W 6007541.30 N 564991.78 E 13.156 7589.46
10132.26 102.760 331.300 4216.67 4288.87 7586.25 N 764.83 W 6007554.53 N 564984.41 E 8.581 7603.81 -~
10200.00 102.760 331.300 4201.71 4273.91 7644.20 N 796.56 W 6007612.20 N 564952.17 E 0.000 7666.39 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 350.000° (True).
Magnetic Declination at Surface is 25.622°(17-Jan-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 10200.00ft.,
The Bottom Hole Displacement is 7685.59ft., in the Direction of 354.051° (True).
21 February, 2003 - 18:00
Page2of3
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19A MWD
Your Ref: API 500292312101
Job No. AKMW3DDDB,
BP EXPLORA TlON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
9143.97
9186.72
10200.00
4333.36
4332.54
4273.91
6719.60 N
6755.08 N
7644.20 N
294.85 W
318.69 W
796.56 W
Tie On Point
Window Point
Projected Survey
""-,,
Survey tool program for MPS-19A MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
176.00
7787.72
0.00
176.00
4335.57
176.00
7787.72
10200.00
176.00
4335.57
4273.91
Tolerable Gyro(MPS-19)
AK-6 BP _IFR-AK(MPS-19)
MWD Magnetic(MPS-19APB1 MWD)
",~
21 February, 2003 - 18:00
Page 3 of 3
DrillQuest 3.03.02.002
)
')
qQ;>-d33
04-Mar-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-19APB 1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 7,787.82 I MD
Window / Kickoff Survey: 7,812.00 I MD (if applicable)
Projected Survey: 10,143.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Q~'(~:F\\lEÐ
. ~-........
Attachment(s)
,",,'AH Z, /j Z~~ð
~~~~ 0f & 1,;&5 WI$., ~m.JßIHton
. ^'!~~?'.;
,~ """'IIO
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-19APB1
_J
Job No. AKZZ30008,
Survey Report
21 February, 2003
Your Ref: API 500292308470
Surface Coordinates: 5999975.31 N, 565816.06 E (70024' 37.3482" N, 149027' 50.6759" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
"~
Surface Coordinates relative to Project H Reference: 999975.31 N, 65816.06 E (Grid)
Surface Coordinates relative to Structure: 4.97 N, 528.92 W(True)
Kelly Bushing: 72.20ft above Mean Sea Level
Elevation relative to Project V Reference: 72.20ft
Elevation relative to Structure: 72.20ft
SP=I ·......y-sul!
DRILLiNG. SERVIc:es
A Halliburton Company
Survey Ref: svy1119
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19APB1
Your Ref: API 500292308470
Job No. AKZZ3000B,
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
7787.72 68.270 331.060 4263.37 4335.57 5588.45 N 436.06 E 6005567.39 N 566202.86 E 5427.83
7787.82 68.270 331.060 4263.40 4335.60 5588.53 N 436.02 E 6005567.47 N 566202.81 E 0.478 5427.92 Tie On Point
7812.00 68.380 331.020 4272.33 4344.53 5608.20 N 425.14 E 6005587.03 N 566191.76 E 0.478 5449.17 Window Point
7837.59 71 .560 331.900 4281.10 4353.30 5629.31 N 413.65 E 6005608.05 N 566180.09 E 12.840 5471.96
7887.33 78.500 333.500 4293.94 4366.14 5671.99 N 391.64 E 6005650.53 N 566157.70 E 14.294 5517.81
7931.98 85.240 334.340 4300.25 4372.45 5711.67 N 372.22 E 6005690.04 N 566137.93 E 15.209 5560.26 ~
7981.37 92.040 335.250 4301.42 4373.62 5756.32 N 351.21 E 6005734.50 N 566116.53 E 13.890 5607.88
8025.65 92.160 334.320 4299.80 4372.00 5796.35 N 332.35 E 6005774.37 N 566097.32 E 2.116 5650.58
8075.36 92.650 331.530 4297.71 4369.91 5840.57 N 309.75 E 6005818.38 N 566074.33 E 5.694 5698.05
8122.66 94.200 326.590 4294.88 4367.08 5881.05 N 285.49 E 6005858.65 N 566049.71 E 10.928 5742.13
8170.07 92.290 323.050 4292.20 4364.40 5919.73 N 258.22 E 6005897.09 N 566022.10 E 8.473 5784.96
8219.53 92.590 322.520 4290.09 4362.29 5959.09 N 228.33 E 6005936.18 N 565991.87 E 1.230 5828.91
8262.30 92.900 322.720 4288.05 4360.25 5993.03 N 202.40 E 6005969.89 N 565965.64 E 0.862 5866.84
8308.19 90.490 322.010 4286.69 4358.89 6029.36 N 174.39 E 6006005.97 N 565937.31 E 5.475 5907.4 7
8354.46 90.490 321 .240 4286.29 4358.49 6065.63 N 145.67 E 6006041.99 N 565908.27 E 1.664 5948. 18
8403.74 90.190 320.230 4286.00 4358.20 6103.78 N 114.48 E 6006079.86 N 565876.74 E 2.138 5991.17
8447.77 92.350 320.470 4285.03 4357.23 6137.67 N 86.39 E 6006113.50 N 565848.36 E 4.936 6029.43
8497.63 92.470 319.860 4282.93 4355.13 6175.92 N 54.48 E 6006151.48 N 565816.11 E 1.246 6072.64
8540.26 92.590 319.250 4281.05 4353.25 6208.34 N 26.85 E 6006183.64 N 565788.20 E 1.457 6109.35
8589.27 91.420 321.630 4279.33 4351.53 6246.09 N 4.34W 6006221.12 N 565756.68 E 5.408 6151.96
8632.78 91.300 322.290 4278.30 4350.50 6280.35 N 31.14 W 6006255.14 N 565729.57 E 1.541 6190.35
8681.57 91.110 324.390 4277.27 4349.47 6319.48 N 60.27 W 6006294.01 N 565700.11 E 4.321 6233.94
8725.69 91.420 327.130 4276.30 4348.50 6355.94 N 85.08 W 6006330.25 N 565674.97 E 6.248 6274.15
8774.17 91.230 325.760 4275.18 4347.38 6396.33 N 111.87 W 6006370.41 N 565647.83 E 2.852 6318.58 -
8816.48 91.670 325.060 4274.11 4346.31 6431.15 N 135.88 W 6006405.01 N 565623.51 E 1.954 6357.04
8864.77 91.850 324.730 4272.62 4344.82 6470.64 N 163.64 W 6006444.25 N 565595.41 E 0.778 6400.75
8909.62 91.540 327.050 4271.30 4343.50 6507.75 N 188.78 W 6006481.15 N 565569.94 E 5.217 6441.67
8958.53 93.400 327.420 4269.19 4341.39 6548.84 N 215.22 W 6006522.00 N 565543.14 E 3.877 6486.72
9000.81 93.520 327.070 4266.64 4338.84 6584.33 N 238.06 W 6006557.29 N 565519.99 E 0.874 6525.64
9050.56 92.040 327.000 4264.22 4336.42 6626.02 N 265.09 W 6006598.74 N 565492.59 E 2.978 6571 .39
9093.75 91.850 326.430 4262.76 4334.96 6662.11 N 288.78 W 6006634.61 N 565468.58 E 1.390 6611.04
9143.97 91.790 325.970 4261.16 4333.36 6703.82 N 316.71 W 6006676.08 N 565440.29 E 0.923 6656.97
9186.00 92.650 326.620 4259.54 4331.74 6738.76 N 340.01 W 6006710.81 N 565416.68 E 2.564 6695.42
9237.09 92.840 326.650 4257.09 4329.29 6781.38 N 368.08 W 6006753.18 N 565388.24 E 0.376 6742.27
9278.82 93.150 326.290 4254.91 4327.11 6816.12 N 391.10 W 6006787.71 N 565364.91 E 1.138 6780.48
21 February, 2003 - 17:57 Page 2 of4 DriflQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19APB1
Your Ref: API 500292308470
Job No. AKZZ3DDDB,
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9330.97 92.160 326.270 4252.49 4324.69 6859.44 N 420.02 W 6006830.79 N 565335.61 E 1.899 6828.17
9373.75 92.280 325.720 4250.84 4323.04 6894.88 N 443.92 W 6006866.01 N 565311.40 E 1.315 6867.22
9424.73 90.740 325.530 4249.49 4321.69 6936.94 N 472.70 W 6006907.82 N 565282.25 E 3.044 6913.64
9467.40 89.940 327.990 4249.24 4321.44 6972.63 N 496.08 W 6006943.30 N 565258.55 E 6.062 6952.84
9517.80 90.000 327.540 4249.27 4321.47 7015.26 N 522.97 W 6006985.69 N 565231.30 E 0.901 6999.49
9560.83 90.310 326.720 4249.15 4321.35 7051.40 N 546.32 W 6007021.62 N 565207.62 E 2.037 7039.14 ~
9611.85 90.490 326.470 4248.79 4320.99 7093.99 N 574.41 W 6007063.96 N 565179.16 E 0.604 7085.96
9654.19 89.010 328.030 4248.98 4321.18 7129.60 N 597.31 W 6007099.37 N 565155.95 E 5.079 7125.00
9703.96 89.140 328.380 4249.78 4321.98 7171.89 N 623.53 W 6007141.43 N 565129.35 E 0.750 7171.21
9747.57 89.380 329.370 4250.34 4322.54 7209.22 N 646.07 W 6007178.56 N 565106.49 E 2.336 7211.89
9797.07 89.510 328.940 4250.82 4323.02 7251.72 N 671.45 W 6007220.83 N 565080.73 E 0.907 7258.14
9839.13 86.420 327.700 4252.32 4324.52 7287.48 N 693.52 W 6007256.40 N 565058.35 E 7.915 7297.20
9889.89 86.230 326.530 4255.57 4327.77 7330.02 N 721.02 W 6007298.69 N 565030.47 E 2.330 7343.87
9931.47 86.350 326.780 4258.26 4330.46 7364.68 N 743.83 W 6007333.15 N 565007.36 E 0.666 7381.96
9982.18 86.850 330.690 4261.27 4333.47 7407.94 N 770.10 W 6007376.18 N 564980.71 E 7.760 7429.13
10024.96 87.650 332.530 4263.32 4335.52 7445.53 N 790.41 W 6007413.59 N 564960.07 E 4.685 7469.67
10075.09 86.850 331.910 4265.73 4337.93 7489.83 N 813.75 W 6007457.68 N 564936.34 E 2.018 7517.35
10143.00 86.850 331.910 4269.46 4341.66 7549.66 N 845.68 W 6007517.22 N 564903.89 E 0.000 7581.81 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey). -",,--.~..,,/
Vertical Section is from Well and calculated along an Azimuth of 350.000° (True).
Magnetic Declination at Surface is 25.622°(17-Jan-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 10143.00ft.,
The Bottom Hole Displacement is 7596.87ft., in the Direction of 353.609° (True).
21 February, 2003 - 17:57
Page 30f4
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19APB1
Your Ref: API 500292308470
Job No. AKZZ3000B,
BP EXPLORA T/ON (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
7787.82
7812.00
10143.00
4335.60
4344.53
4341.66
5588.53 N
5608.20 N
7549.66 N
436.02 E
425.14 E
845.68 W
Tie On Point
Window Point
Projected Survey
~'
Survey tool proqram for MPS-19APB1
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
176.00
0.00 176.00
176.00 10143.00
176.00 Tolerable Gyro(MPS-19)
4341.66 AK-6 BP _IFR-AK(MPS-19)
c~
21 February, 2003 - 17:57
Page 4 of4
DrillQuest 3.03.02.002
'\
l
)
aÙ;1~3~
_.....)
04-Mar-03
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well MPS-19APB1MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 7,787.82' MD
Window / Kickoff Survey: 7,812.00' MD (if applicable)
Projected Survey: 10,143.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECE,\\IED
Wtt\R 2. 6 200~
i"., '\Ì~n
." t....,. ~ \" ~ -.})í M \1::01\01
1"\.! &. Gt\~ ,;.) h·
~a~~~fJ. V\\ """......~y:,
M\.":'.\'Jï~;¡"
Attachment(s)
Sperry-Sun Drilling Services
Milne Point Unit
BPXA
Milne Point MPS
MPS-19APB1 MWD
~,,-/
Job No. AKMW30008,
Survey Report
21 February, 2003
Your Ref: API 500292312170
Surface Coordinates: 5999975.31 N, 565816.06 E (70024' 37.3482" N, 149027' 50.6759" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
,-,.
Surface Coordinates relative to Project H Reference: 999975.31 N, 65816.06 E (Grid)
Surface Coordinates relative to Structure: 4.97 N, 528.92 W(True)
Kelly Bushing: 72.20ft above Mean Sea Level
Elevation relative to Project V Reference: 72.20ft
Elevation relative to Structure: 72.20ft
5pa............v-5ul!
DRILLING seRVlc:es
A Halliburton Company
Survey Ref: svy1122
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19APB1 MWD
Your Ref: API 500292312170
Job No. AKMW30008,
BP EXPLORA TlON (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
7787.72 68.270 331 .060 4263.37 4335.57 5588.45 N 436.06 E 6005567.39 N 566202.86 E 5427.83 Tie On Point
MWD Magnetic
7812.00 68.380 331.020 4272.33 4344.53 5608.20 N 425.14 E 6005587.03 N 566191.76 E 0.478 5449.17 Window Point
7837.59 71.560 331.900 4281.10 4353.30 5629.31 N 413.65 E 6005608.05 N 566180.09 E 12.840 5471.96
7887.33 78.500 333.500 4293.94 4366.14 5671.99 N 391.64 E 6005650.53 N 566157.70 E 14.294 5517.81
7931.98 85.240 335.350 4300.25 4372.45 5711.84 N 372.57 E 6005690.21 N 566138.29 E 15.642 5560.37
-
7981.37 92.040 336.020 4301.42 4373.62 5756.81 N 352.26 E 6005735.00 N 566117.57 E 13.835 5608.18
8025.65 92.160 334.080 4299.80 4372.00 5796.93 N 333.59 E 6005774.95 N 566098.55 E 4.387 5650.93
8075.36 92.650 332.260 4297.71 4369.91 5841.25 N 311.17E 6005819.07 N 566075.75 E 3.788 5698.47
8122.66 94.200 327.510 4294.89 4367.09 5882.08 N 287.49 E 6005859.69 N 566051.71 E 10.546 5742.79
8170.07 92.290 323.900 4292.20 4364.40 5921.17 N 260.83 E 6005898.55 N 566024.70 E 8.603 5785.92
8219.53 92.590 323.140 4290.10 4362.30 5960.90 N 231.45 E 6005938.02 N 565994.97 E 1.651 5830.15
8262.30 92.900 324.500 4288.05 4360.25 5995.39 N 206.23 E 6005972.28 N 565969.45 E 3.258 5868.49
8308.19 90.490 324.890 4286.69 4358.89 6032.82 N 179.72 E 6006009.48 N 565942.61 E 5.320 5909.96
8354.46 90.490 323.510 4286.29 4358.49 6070.34 N 152.66 E 6006046.76 N 565915.22 E 2.982 5951.61
8403.74 90.190 321.760 4286.00 4358.20 6109.51 N 122.75 E 6006085.66 N 565884.97 E 3.603 5995.37
8447.77 92.350 322.420 4285.03 4357.23 6144.24 N 95.71 E 6006120.15 N 565857.62 E 5.130 6034.27
8497.63 92.470 322.080 4282.93 4355.13 6183.62 N 65.21 E 6006159.27 N 565826.78 E 0.723 6078.36
8540.26 92.590 323.400 4281.05 4353.25 6217.52 N 39.43 E 6006192.94 N 565800.69 E 3.106 6116.21
8589.27 91.420 324.960 4279.33 4351.53 6257.23 N 10.76 E 6006232.40 N 565771.68 E 3.977 6160.30
8632.78 91.300 323.850 4278.30 4350.50 6292.60 N 14.56 W 6006267.54 N 565746.05 E 2.565 6199.53
8681.57 91.110 325.480 4277.27 4349.47 6332.40 N 42.77 W 6006307.08 N 565717.49 E 3.363 6243.62
8725.69 91.420 326.930 4276.30 4348.50 6369.05 N 67.30 W 6006343.52 N 565692.64 E 3.360 6283.98
8774.17 91.230 326.360 4275.18 4347.38 6409.53 N 93.95 W 6006383.77 N 565665.63 E 1.239 6328.47 -
8816.48 91.670 325.910 4274.11 4346.31 6444.65 N 117.52 W 6006418.68 N 565641.76 E 1 .487 6367.15
8864.77 91.850 326.270 4272.62 4344.82 6484.71 N 144.44 W 6006458.50 N 565614.48 E 0.833 6411.28
8909.62 91.540 327.870 4271.30 4343.50 6522.34 N 168.81 W 6006495.91 N 565589.78 E 3.632 6452.56
8958.53 93.400 328.900 4269.19 4341.39 6563.95 N 194.43 W 6006537.29 N 565563.80 E 4.346 6497.99
9000.81 93.520 327.620 4266.64 4338.84 6599.84 N 216.63 W 6006572.98 N 565541.28 E 3.035 6537.19
9050.56 92.040 327.100 4264.23 4336.43 6641 .68 N 243.43 W 6006614.59 N 565514.11 E 3.153 6583.05
9093.75 91.850 326.400 4262.76 4334.96 6677.78 N 267.10 W 6006650.48 N 565490.13 E 1.678 6622.71
21 February, 2003 - 17:59
Page 2 of4
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19APB1 MWD
Your Ref: API 500292312170
Job No. AKMW3000B,
BP EXPLORA TION (ALASKA) INC. BPXA
Milne Point Unit
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) r/100ft)
9143.97 91.790 326.460 4261.16 4333.36 6719.60 N 294.85 W 6006692.05 N 565462.00 E 0.169 6668.72
9186.00 92.650 327.300 4259.54 4331.74 6754.78 N 317.80 W 6006727.02 N 565438.75 E 2.859 6707.34
9237.09 92.840 326.650 4257.09 4329.29 6797.56 N 345.61 W 6006769.56 N 565410.56 E 1.324 6754.31
9278.82 93.150 326.540 4254.91 4327.11 6832.35 N 368.56 W 6006804.15 N 565387.31 E 0.788 6792.55
9330.97 92.160 326.310 4252.49 4324.69 6875.75 N 397.36 W 6006847.29 N 565358.12 E 1.949 6840.30
92.280 325.800 4250.84 4323.04 6911.22 N 421.23 W 6006882.55 N 565333.94 E 1.224 6879.37 " --
9373.75
9424.73 90.740 324.880 4249.49 4321.69 6953.13 N 450.22 W 6006924.21 N 565304.59 E 3.518 6925.68
9467.40 89.940 327.870 4249.24 4321.44 6988.66 N 473.84 W 6006959.52 N 565280.65 E 7.254 6964.77
9517.80 90.000 327.760 4249.27 4321.47 7031.31 N 500.69 W 6007001.94 N 565253.43 E 0.249 7011.44
9560.83 90.310 326.520 4249.15 4321.35 7067.46 N 524.03 W 6007037.88 N 565229.77 E 2.970 7051.08
9611.85 90.490 325.980 4248.79 4320.99 7109.88 N 552.38 W 6007080.04 N 565201.05 E 1.116 7097.78
9654.19 89.010 327.980 4248.98 4321 .18 7145.38 N 575.45 W 6007115.34 N 565177.67 E 5.876 7136.75
9703.96 89.140 328.060 4249.78 4321.98 7187.59 N 601.81 W 6007157.31 N 565150.94 E 0.307 7182.89
9747.57 89.380 328.610 4250.35 4322.55 7224.70 N 624.70 W 6007194.23 N 565127.72 E 1.376 7223.42
9797.07 89.51 0 329.460 4250.82 4323.02 7267.14 N 650.16 W 6007236.44 N 565101.88 E 1 .737 7269.64
9839.13 86.420 327.300 4252.32 4324.52 7302.93 N 672.20 W 6007272.04 N 565079.54 E 8.961 7308.71
9889.89 86.230 325.630 4255.57 4327.77 7345.15 N 700.18 W 6007314.01 N 565051.18 E 3.304 7355.15
9931.47 86.350 325.930 4258.26 4330.46 7379.46 N 723.51 W 6007348.11 N 565027.55 E 0.776 7392.99
9982.18 86.850 330.800 4261.27 4333.47 7422.55 N 750.06 W 6007390.96 N 565000.62 E 9.637 7440.03
10024.96 87.650 332.670 4263.32 4335.52 7460.18 N 770.29 W 6007428.42 N 564980.06 E 4.750 7480.61
10075.09 86.850 332.320 4265.73 4337.93 7504.60 N 793.41 W 6007472.62 N 564956.54 E 1.742 7528.36
10143.00 86.850 331.910 4269.46 4341.66 7564.53 N 825.13 W 6007532.28 N 564924.30 E 0.603 7592.89 Projected Survey
All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. c~
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 350.000° (True).
Magnetic Declination at Surface is 25.622°(17-Jan-03)
Based upon Minimum Curvature type calculations, at a Measured Depth of 10143.00ft.,
The Bottom Hole Displacement is 7609.40ft., in the Direction of 353.775° (True).
21 February, 2003 - 17:59
Page 30f4
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Milne Point MPS - MPS-19APB1 MWD
Your Ref: AP/500292312170
Job No. AKMW30008,
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
BPXA
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
7787.72
7812.00
10143.00
4335.57
4344.53 -
4341.66
5588.45 N
5608.20 N
7564.53 N
436.06 E
425.14 E
825.13 W
Tie On Point
Window Point
Projected Survey
'-"
Survey tool program for MPS-19APB1 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
176.00
7787.72
0.00
176.00
4335.57
176.00
7787.72
10143.00
176.00
4335.57
4341.66
Tolerable Gyro(MPS-19)
AK-6 BP _IFR-AK(MPS-19)
MWD Magnetic(MPS-19APB1 MWD)
"~'
21 February, 2003 - 17:59
Page 4 of4
DrillQuest 3.03.02.002
)
)
WELL :LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
~Od-a33
J I 5/fp
February 14, 2003
RE: MWD Formation Evaluation Logs MPS-19A PB 1,
AK-MW-30008
1 LIS formatted Disc with verification listing.
API#: 50-029-23121-70
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99648
Date:
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
.~
RECEI'I1:,I""'.,
Vc;u
FEe 1 'I')
! 0 r/'I("::"
AJ.~ , ' L~~U
.9...1'~ 1"1:-' !}, '....
""f,I,;O,~".,
A , ' ~"'ìi¡,;.~.\,~~.
¡-¡'!t;~, -...., ~
t: I\<'¡~~"l .. Dn
~il\.
,)
)
aOd-d33
11~/5
WELL :LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Conun.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
February 14, 2003
RE: MWD Formation Evaluation Logs MPS-19A,
AK-MW-30008
1 LIS formatted Disc with verification listing.
API#: 50-029-23121-01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNJNG A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99648
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
s~:~~~
REceIVED
FEe 1 8 2003
Alaaq œ &
Gas Cons. Co '.
Anchorage rnmlseion
)
~u~JŒ : Í !Æ~!Æ~II!Æ
AI,ASIiA OIL AND GAS
CONSERVATION COMMISSION
FRANK H. MURKOWSKI, GOVERNOR
333 W. TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage, Alaska 99519
Re: Mile Point Unit MPS-19A
BP Exploration (Alaska), Inc.
Permit No: 202-233
Surface Location: 3308' NSL, 195' WEL, Sec. 12, TI2N, RI0E, UM
Bottomhole Location: 730' NSL, 1297' WEL, Sec. 35, TI3N, RI0E, UM
Dear Mr. Archey:
Enclosed is the approved application for permit to redrill the above development well.
This permit to redrill does not exempt you from obtaining additional permits or approvals
required by law from other governmental agencies, and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
Commission reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's North Slope petroleum field inspector at 659-3607 (pager).
Sincerely,
~cJ-~
Michael L. Bill
Commissioner
BY ORDER OF THE COMMISSION
DATED this ;tJ~ay of December, 2002
cc: Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
\ STATE OF ALASKA',
ALASKA 01.... AND GAS CONSERVATION COMMIS,-.1N
PERMIT TO DRILL
20 AAC 25.005 /'
1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil
o Service 0 Development Gas 0 Single Zone 0 Multiple Zone
5. Datum Elevation (OF or KB) 10. Field and Pool /'
Plan KBE = 68' Milne Point Unit I Schrader
6. Property Designation Bluff
ADL 025518
7. Unit or Property Name
Milne Point Unit
8. Well Number /
MPS·19A
9. Approximate spud da~,/
01/01/03 Amount $200,000.00
/ 14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 10634' MD 14294' TVD
o 17. Anticipated pressyçe {see 20 AAC 25.035 (e) (2)}
96 Maximum surface 1516 psig, At total depth (TVD) 4336' 11950 psig
Setting Depth
T Q~ Bot;om Quantity of Cement
Lenath MD TVD MD TVD (jnclude staQe da~
2834' 7800' 4336' 10634' 4294' Uncemented Slotted Liner
~.,,,- ¡ 2.-/2-3/0''-
1 a. Type of work 0 Drill II Redrill
ORe-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3308' NSL, 195' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
3631' NSL, 4524' WEL, SEC. 06, T12N, R11 E, UM, ('OA' Target 1)
At total depth
730' NSL, 1297' WEL, SEC. 35, T13N, R10E, UM, ('OA'Target 1)
11. Type Bond (See 20 AAC 25.025)
Number 2S 100302630-277
12. Distance to nearest property line 13. Distance to nearest well
ADL 380110, 730' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 7800' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
CasinQ Weight Grade Couolina
4-1/2' 12.7# L-80 BTC
Hole
6-1/8"
Casing
8123 feet
4453 feet
8028 feet
4419 feet
Length
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Alaska Oil & Gas Cons. Commission
Anchnr::1gp,
II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Steve Campbell, 564-4401 Prepared By Name/Number: Sandra Stewman, 564-4750
21. ~~:~:y ::.:~~t thep3°ã: :z;corred to::~:::~: Engineer Date J 2- /D 3/ 0 ~
Permit Number API Number Appr9ve.l,p~'r .:l See cover letter
2LJ? - 2-.53 50- 029-23121-01 ~ J() J)/) for otherrequirements
Conditions of Approval: Samples Required 0 Yes J8I No Mud Log ReqLired 0 Yes ~ No
Hydrogen Sulfide Measures 0 Yes (gI No Directional Survey Required ~ Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
- t- 'B? P E fc eft: () C tC) ~ .' , ,r" r J
Other: ~ (~ ' AAL 'I.. -3ð{c ) 'I j (. O(/~--V( '4> f:~~ktA..). t~ h'\..eul t 7 S W t"t.-( '\l,t (\ ,.
ÖRIGrf\1AL SIGNËb"BY~) ) 'k_~ . ,bY{fJraer o.f . ,.'" 9- 'II/)
M L Dill Commls$loner the commiSSion Date I·· ~< (~ ~ ) f:.::t'
Subm~ In TriP'íicate
Structural
Conductor
Surface
Intermediate
Production
Liner
112'
2637'
8114'.
Perforation depth: measured
None
true vertical
None
20. Attachments
Approved By
Form 10-401 Rev. 12-01-85
Plugs (measured)
Junk (measured)
Size Cemented MD TVD
20" 260 sx Arctic Set (Approx.) 112' 112'
9-5/8" 786 sx PF 'L', 225 sx Class 'G' 2637' 2347'
7" 75 sx Class 'E', 273 sx Class 'G' 8114' 4450'
RECEIVED
DEC 0 6 2002
" I; ~ '()
) ~r )~ Point MPS-19A Well Permit
IWell Name: IMPS-19A
Drill and Complete Plan Summary
I Type of Well (service 1 producer 1 injector): I Multi Lateral Producer "OA" sand
Surface Location: 19711 FNL, (330~ FSL), 1941 FEL, (50851 FWL), SEC. 12, T12N, R10E
X=565816.01 Y=5999975.08
1649' FNL, (36311 FSL), 4524' FEL, (234' FWL), SEC. 06, T12N, R11 E
E=566194.58 N=6005581.38 2=4336' TVD
45501 FNL, (7301 FSL), 1297' FEL, (39831 FWL), SEC. 35, T13N, R10E
E=564648.00 N=6007947.00 2=4294' TVD
Target Location 1:
TOP "OA"
Target Location 1:
BHL "OA" Well TD
1 AFE Number: I
I Estimated Start Date: I 01 Jan 03
I MD: 110,6341 1 TVD: \4294 1
1 Objective: I
Schrader OA Sand
I RiQ: I Doyon 14 ~ I
I OperatinQ days to complete: 19 I
1 Max Inc: 196 1 I KOP: 178001 I KBE: 168 1
1
I
1 Well Design (conventional, slimhole, etc.): I Sidetrack ML Producer
Mud Program:
6-1/8" Production Hole Mud Properties:
Density (ppg) Funnel visc YP HTHP
KCL-CaC03 Flow Pro
PH API Filtrate LG
Solids
<12
8.6 - 9.20 / 40 55 22 - 27 <10 8.0 - 8.5 4 - 6
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to D8-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be
ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1
Evaluation Program:
6-1/8" Hole section:
Open Hole: MWD/GRlRES ABI/IFRlCASANDRA
1
')
CasinglTubing Program:
IV " Point MPS-19A Well Permit
Hole Size Csgl WtlFt Grade Conn Length Top Bottom
Tbg O.D. M DITVDrkb MD I TVDrkb
/ 42" 20" 92# H-40 Welded 112' 0' 112'/112' -1
/ 12-1/4" 9-5/8" 29.7# L-80 BTC 2637' 0' 2637'/2347'
/1'
/ 9-5/8" 7" 26# L-80 BTC 8114' 0' 8114'/4450'
6-1/8" 4-1/2" 12.7# L-8J' BTC 2834' 7800'/4336' 10634'/4294'
*The 20" casing is insulated
Recommended Bit Program:
BHA
Hole
Size
6-1/4"
Depth (MD)
Bit Type
Nozzle/Flow
rate
3 -12
1
7016' - TD
Secu rity FM2643
Well Control: I,I-lGk-"
· Production hole Wil~ith a diverter.
Surface Interval
· Maximum anticipated BHP:
· Maximum surface pressure:
· Planned BOP test pressure:
1950 psi @ 4336' TVDrkb - Top of "OA"
1516 psi @ surface /'
(Based on BHP and a full column of gas from TO @ 0.1 psi/ft)
Diverter will be function tested. BOP's: Test annular 250 psi low
And 2500 psi high, and rams to 250 psi low and 4,000 psi high. /"
N/A
9.2 ppg NaCI / 6.8 ppg Diesel ./
· Kick tolerance:
· Planned completion fluid:
Drilling Hazards & Contingencies:
Hydrates
· Hydrates have not been seen on S pad, but have been encountered in the surface holes on
other pads, especially nearby H-Pad. Hydrates generally occur just below the Permafrost (+/-
1800 ss) but may be present in shallower SV sands and also as deep as 3000 ft. Be alert for
the possibility of shallow gas and/or hydrates. Use recommended practices for drilling
hydrates. Pretreat mud with DrilTreat; Increase mud wt; Maintain cool mud « 60 deg F); Limit
ROP and Reduce pump rate while drilling hydrates; Circulate connections thoroughly. See Well
Program and Recommended Practices for specific information.
· Another item to watch out for is deeper gravels below the Permafrost or gravels that calve off
within the permafrost and will tend to drop out when the aerated hydrate gas cut mud is being
circulated out. Maintain adequate viscosity. In the past several Milne Pt wells have
experienced stuck pipe from this situation.
2
)
IV 'r Point MPS-19A Well Permit
Lost Circulation
· We do not expect losses while drilling this well.
· Offset wells encountered losses while running and cementing casing and only one well had
losses while running a hole opener. Below is a list of the wells and the lost circulating problems
associated with them. H-06 (1995): Lost 100 bbls running 9-5/8" casing, good returns during
cementing except no returns for last 20 bbls, contaminated cement to surface, cement 12 ft
down, no top job. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid
losses occur while drilling. Break circulation slowly in all instances and get up to recommended
circulating rate slowly prior to cementing.
Expected Pressures
· It is unlikely there will be unexpected overpres~re when drilling to the Schrader Bluff formation.
Reservoir pressure is expec~.. 0 be (8.65Ib/gal EMW). In this well, the Schrader Bluff
formation will be drilled With~.r ppg mud.
Pad Data Sheet
· Please Read the S-Pad Data Sheet thoroughly.
Breathing
· N/A
Hydrocarbons
· Hydrocarbons will be encountered in the NA through the Schrader Bluff.
Faults
· NA
Hydrogen Sulfide /
· MPS Pad is not designated as an H2S Pad.
Anti-collision Issues
· MPS-19 has no anti-collision issues.
3
) Milne Poir )PS-19a Well Permit
DRILL & COMPLETION PROCEDURE
Pre- Rig Operations
1. The 20", 9-5/8" & 7" casing strings have already been installed as per the original permit
Procedure
2.
3.
4.
5.
1. MIRU, NU and test 13 %" 5m BOP and test annular to 250 low and 2500 high. Test the rams
to 250 low and 4000 psi high /'
Test casing to 3,500 psi
Pick up bit and 3-1/2" drill pipe and Rill /'
Drill out cement to float collar, POOH
Make up Baker Window Master milling assembly with bottom trip anchor and M~.
a. RIH. Orient and set whipstock to place window at top of the OA interval (7800' MD).
b. Shear off and mill window thru 7" casing.
6. Drill 1 st 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPro mud
properties and POOH.
7. Run 4 Y2" slotted liner with liner hanger with 50' of lap /'
8. Make up Baker Window Master milling assembly with bottom trip anchor and MWD.
a. RIH. Orient and set whipstock to place window at (7680' MD) ~
b. Shear off and mill window thru 7" casing.
9. Drill 2nd 6-1/8" OA lateral geosteering and short tripping as required. Maintain FloPrömud
properties and POOH. '
10. MU whipstock retrieving tool and pull whipstock
11. Run 4 Y2" slotted liner with Baker Hook Hanger and hang off in 7" casing /'
12. POOH
13. Till and displace out drilling mud with 9.2 ppg N aCl /
14. POOH
15. Run in hole with 4-1/2" jet pump completion as per schematic /'
16. Land tubing hanger and test
17. Set BPV
18. ND BOP
19. Install and test tree
20. Pull BPV
21. Drop ball and set production packer
22. Test 7" x 4-1/2" annulus and packer to 3500 psi
23. Freeze protect thru GLM
24. Install BPV and secure the well /
25. RD/MO
4
Tree: Cameron 7-1/16", 5 r'')
Wellhead: FMC 11" gen 5 ca:Slng
hanger.
MPU S-19i
20"X 34" insulated, 215 #/ft A-53 ~ ..
KOP @ 590'
Max. hole angle = 71 deg @ 6850
Hole angle thru' perfs =
9 5/8" 40#, L-80, BTRC Casing
(drift 10 = 8.679, Ann cap.= .0282 bpf)
9 5/8" Howco float shoe
I 2637' I J
7" 26#, L-80, BTRC Casing
(drift 10 = 6.151, cap.= .0383 bpf)
Peñoration Summary
Size Spf
(TVD)
Interval
OA Sands
08 Sands
~
..
DATE
11/13/02
REV. BY
COMMENTS
Drilled by Doyon 141
J.Jones
)rig. DF Elev. = 66.00'
Orig. GL Elev. = 38.50'
c'Un-eA+
./
7" Halliburton Float Collar
7" Halliburton float shoe
8029'
8112'
MILNE POINT UNIT
WELL No.: S-19i
API : 50-029-23121-00
BP EXPLORATION (AK)
1121
ftPJ,°SPOSi::LJCUMPLi::IIUN )
.".. -1~ ~ S--9A L,
~~~~
20" 92 I bitt , H-40 Welded .... .
Insulated
Diesel Freeze protect to
750' MD
KB. ELEV =66'
Cellar Box ELEV = 38.5'
TREE: Cameron 4-1/16" 5M
WELLHEAD: FMC Gen 5 11 ", 5M
Tubing Head: 11" x 4-1/2",
FMC Tubing Hanger
...
9-5/8" 40#, L-80, BTC-M
Casing Drift: 8.679
Casing ID: 8.835
Coupling aD: 10.625"
Burst: 5,750 psi
Collapse: 3,090 psi
.
42" Hole
4-1/2" x 1" Gas Lift Mandrel @ 2,200' MD , 2020' TVD
RP shear valve open position '
4-1/2", 12.6 Ibltt, L-80, IBT-M
Coupling aD: 5.2"
DriftllD: 3.833"
Burst: 8,430, 80% 6,744 psi
Collapse: 7,500, 80%=6,000 psi
9.2 KCL with corrosion
inhibitor as packer fluid
...
~
D
III
~ .... 19-5/8" @ 2652'MD, 2356' TVD
"'" BIW 1- Wire
Phoenix Pressure Gauge (3.850" ID, W/BIW I- wire down
to lower sensor)
Jet Pump Installed in
Sliding Sleeve Post rigl
r---:
Halliburtion Dura Sleeve XD WIX Nipple (3.813" ID)
Phoenix Pressure Gauge (2.840" ID)
3-1/2" 'X' Nipple 2.813" ID
7" 26#, L-80, BTC-M
Casing Drift: 6.151
Casing ID: 6.276
Coupling aD: 7.656"
Burst: 7,240 psi
Collapse: 5,410 psi
~ -
.;"1",
~; . .
7" x 3-1/2" Premier Packer
Iset @ 7630'MD, 4274' TVD I
.
....
A
3-1/2" HES 'XN' nipple 2.750" ID No Go W/RHC ball & rod
Wireline Entry Guide
Window in 7" casing @ 7,680'
Well Inclination @ Window = 68 deg
\~
........
Multi-Lateral Junction 7,680'
6-1/8" OA Lateral 2 TD 11,611'
"""--
- - --
- -
OA Horizontal 6-1/8" hole
r.....
..... -
- -
- -
- -
4-1/2" Slotted Liner W/Hookwall hanger
/" \
,/ I
Top liner~' MD -------.
Window in 7" æsing @ ~r)
Well Inclination @ Win~8 deg
~
""
........
9-7/8" Hole
6-1/8" OA Lateral TD 110,634' I /'
.....
- - --
- -
OA Horizontal 6-1/8" hole
7" PBTD @ 8029' MD
7" Casing Shoe @ 8,1121 MD
Well Inclination @ Shoe = 68 Degrees
~~l
..... -
- - --
4-1/2" Slotted Liner Wlliner hanger
DATE
05101102
REV. BY
SKC
COMMENTS
Level 3 Multi-lateral, 4-112" Jet Pump Completion
Milne Point Ilnlt
WF~ ~ : ~-19A M~
API NO: 0'9-'3084-00 &
0'9-'3084-60
BP Exploration (Alaska)
Plan: MPS-19A wp02 (MPS-I9/Plan MPS-19A)
Ken AUen
Date:
Date:
Created By:
Checked:
Reviewed:
SURVEY I'ROGRAJ,¡
Depth Fm D<pth To Sur,,<yPlaD Tool
7800.00 10634.77 Plaooed: MPS-19A wp02 V MY,~IFR~M
REFERENCE I?-'FORMA nON
CO-t."\fdinltë' (NE) Ref~¿oœ: WdlC.'fiIJ"¿: MPS-19. True North
V~rtk.øJ (lVDJ Ref¿r.:'nœ: RB 66.50 6650
&...:fi)ß (V51 Ref¿oœnce: Slot - (O.OON.O.OOE)
M=ured Dep<h R<f¿r<",,,: RB 6650 6650
Caku1atioo Mctt.cd- MmÎl11um Curvature
Ca\..:ubIÍil.m Ml.!d....>oJ: Mißlmum Cur\':Hure
Em1r Snr...-m: ISC\\.'SA
s.:an l\.f':ll'Kxt: 1 ra\' CyliD..t..'1' N...mh
Em\f Surfa..:..:: ElliplÍ\:a1 ~ Ca5I£1ß
Wamillll M~llk___t Rul...-s ßaS!:d
bp
o
.-.-'
Targe
MPS-19 OA T1
MPS-19 OA T2
SI,
N'A
VSec
5492.48
5509.96
5699.07
5891.15
5988.93
6189.48
6189.54
6678.91
6701.70
6720.08
7327.26
7423.44
8057.58
Loogitud<
149o;t7'5O.676W
Eastiog Shap<
564648.00 Point
564995.00 PoiDt
565780.00 Point
565448,00 Point
TFace
0.00
0.00
5,86
0.00
-148.99
0.00
79,70
0.00
-0.04
56.80
0.00
78.88
0.00
DLeg
0.00
c-:~:g~
0.00
6.00
0.00
4.00
0.00
4.00
4.00
0.00
4.00
0.00
WEll DETAD-S
EastIiJg Últituœ
565816.06 70"24'37.348N
TARGET DETAILS
-N!-S Northing
6007947.00
6007357.00
6006225.00
6006694.00
SECTION DETAILS
+EI-W
427.94
418.87
315.85
206.48
147.39
19.02
18.98
-294.28
-308.87
-320.50
-700.13
-756.05
1097.87
-B·W
Œ7.87
756.05
19,02
308.87
+N/-S
5603.05
5619.44
5796.16
5975.01
6065.58
6250.36
6250.42
6701.31
6722.31
6739.27
7299.94
7389.34
7982.43
7982.43
7389.34
625036
612231
Northing
599997531
lYD
4294.50
4321.50
434250
434250
4336.51
4343.49
4368.05
4347.65
4342.42
4342.50
4342.50
4342.72
4342.50
4342.06
4324.92
4321.50
4294.50
TVD
-E'·W
28.'
Narœ
MPS-190A 14
MPS-190A 13
MPS·190A Tl
Mps·190A 12
331.03
331.03
328.55
328.55
325.21
325.21
325.21
325.21
325.21
325.90
325.90
330.04
330.04
-N'-S
2.0
Azi
Narœ
MPS-I
Inc
68.36
70.76
95.56
95.56
89.98
89.98
89.98
89.98
91.00
91.45
91.45
92.26
92.26
MD
7800.00
7820.00
8027.66
8238.28
8346.61
8571.61
8571.68
9120.71
9146.28
9166.84
9844.17
9949.70
10634.77
Sec
1
2
3
4
5
6
7
8
9
10
11
12
13
9()()()
MPS-19 OA T3
MPS-19 OA T4
FORMATION TOP DETAILS
No. TVDPath MDPath Fonnation
1 4340.50 7811.15 OA
CASING DETAILS
No. TVD MD Name Size
1 4294.49 10634.76 41/2" 4.500
~
TO": ",pili, 10634.71' MD, 4294.", TVD -1
~ [ i MPS-19A wp02
I '
"
~ r..W~-19 O''!'' -4 4 1/2
I
7800 8100
All TVD depths are
ssTVD plus 66.5'for RKBE.
MP~-190'!" 13
i \
/ ! /-
.5' TVO !
i
[
[
j
I
7500
""
9UÜ ì ~). .:.324.92'TVL"
Erd ¿ir : 9~ý,ì~.<32
i I
I !
i I
i I
I ,
7200
[300ft/in]
Sial: oir.:./ I 00'
i
,
1
¡
,
I
6900
Section at 352.17
~~
C Slal1 Dir 121100' : 7800' MD, 4336.51'TVD
;§ End Dir : 8027.66' MD, 4368.05' TVD
g 4200- Slal1 Dir 6IlOO' : 8238.28' MD, 4347.65'TV0
~ I EndDir:8346.6I'MD,4342.42'TVO
~ - r ! ' ' "õ:n<' O·r : 8571.58' 1.10, <347.5' TVO
8 """"'.., . ¡ J ; I,! 0 J' St.lt~r4,il(1()"~'>71~1',IM\L14)~T\!n Ii
_ ~~ '--\' J n I r ð ! / 1 0 I I NlPS-190A L
.§ _, .::i ,~(7, i ! ~ I I Ý, i
E i ~ -g.' MPS-IQ M T I ¡ ! 9000 /
> ' I ~ 0, I I' ¡ ,
0) 'II ~i I ' SŒI10ir4/IPO':,)12U:'~io 43-2.7r\1 ! i
::> __, I I I.' ' 1.. .
¡:: !! /V'fS-IQ(/"t PS-IQ)! i Er¡<! Dtr : 9 66.84( LVV, 43<-2.(;6' ~"J !
4500 i " I ! I 1
---+-MPj-I':¡Ci,.ry/"tP'),I,gl'),,' I ¡ I;
, i I í I !'
I' I ! ¡
t I j í
5400 6000 6300 6600'
Vertica
'/000
5700
o
,rI
I
I /1
~¿
I s§'
~
/
Plan: MPS-19A wp02 (MPS-19/Plan MPS-19A)
Created By: Ken Allen Date:
Checked: Date:
Re\-;ewed:
SURVEY PRCXiRAM
IRpth Fm Depth To Sum'yPlan Tool
7800.00 10634,77 Planœ-d: ~1PS-19A wp02 V' MWD-IFR-MS
REFERENCE lI'-'fORMATlON
Co~dinn¿(N-E) R¿f~OI..~: WèIlCentn~: MPS-19. True N'I.-"lItb
Ve¡tical nVD) Rd-;œocë: RB 6650 66.50
Sox(ÎI.--..n (VS) Refereoce: 510......1· (O.OON.O.OOE)
M<",wed Deplh R<ferenœ: RB 6650 6650
Calculation MètOOi: MinÎIlRlID CWV3l1.Ire
bp
o
Slot
N!A
Longitud,,;:
149O;!T50.676W
Shape
Poinl
Poinl
Poinl
Poinl
Eastiog
564648.00
564995,00
565780.00
565448.00
Latitud¿.
70'14"37348N
TARGET DETAILS
-N'-S -El-W Northing
6007947.00
6007357.00
6006225.00
6006694.00
WELL DETAIlS
Easling
565816.06
W7.87
756,05
19,02
308.87
7982.43
738934
625036
672231
Northing
599997531
HTI
429450
432150
434250
434250
-El-W
-528_1
Narœ
MPS-190A 14
MPS-190A 13
MPS-19 0.11. 11
~1PS-19 0.11. 12
-N'-S
2.0
Narœ
MPS-
FOR.MA nON TOP DETAILS
No_ TVDPath MDPath Formation
I 4340.50 7811.15 OA
CASING DETAILS
No. TVD MD Name Size
4294,49 10634.76 41/2' 4.500
MD, 4294.5' TVD
0634.77'
Minimum Cur...alUT<:
ISell'SA
T ra... (\·Ii~r N....'o£th
EIHplil.-ã1 - Casing
Ruk->113<.:.1
Cakulatk.J) M...'1lk-..1
Em'\( Sysl<:rn
Scan M':It)t.'ilI:
rrr\lr Surrac..::
WamirJ:'l p..f1,."tb.1d;
/2'
4
8000
Target
MPS-19 OA Tl
~
MPS-190A
VSec
5492,48
5509.96
5699.07
5891.15
5988.93
6189,48
6189.54
6678.91
6701.70
6720.08
7327.26
7423.44
8057.58
TFaee
0.00
0.00
-5.86
0.00
-148.99
0.00
179.70
0.00
-0.04
56.80
0.00
78.88
0.00
DLeg
0.00
12.00
-¡rOO
0.00
6,00
0.00
4.00
0.00
4.00
4.00
0,00
4.00
0.00
SECTION DETAILS
+N/-S
+EI-W
427.94
418.87
315.85
206,48
147.39
19.02
18.98
-294.28
-308.87
-320.50
-700.13
-756.05
-1097.87
','.111,05
~'.I·J.44
'.i'·'d6
'·'i".OI
,.11,. ,.58
,.~ "1.36
..:'.'1.42
'. illl.31
,. i_' ~,,31
r, i "l.27
i_hN.94
! ,x'J.34
/,lx:,,43
TVD
4336.51
4343.49
4368.05
4347.65
4342.42
4342.50
4342.50
4342.72
4342.50
4342.06
4324.92
4321.50
4294.50
Azi
331.03
331.03
328.55
328.55
325.21
325.21
325.21
325.21
325.21
325.90
325.90
330.04
330.04
Ine
68.36
70.76
95.56
95.56
89.98
89.98
89.98
89.98
91.00
91.45
91.45
92.26
92.26
MD
7800.00
7820.00
8027.66
8238.28
8346.61
8571.61
8571.68
9\20.71
9146.28
9166.84
9844.17
9949.70
10634.77
-See
I
2
3
4
5
6
7
8
9
10
II
12
13
7600
MPS-19 OA T3
MPS-19 OA T4
~
~
e<:õo
~
~
.s(q,
~ ~ ~4'
~O /'
/~
0
8571.68' MD, 4342.5' TVD {J
: 8571.61' MD, 4342.5'TVD
.¡J
8346.61' MD, 4342.42' TVD fJ
6/100': 8238.28' MD, 4347.65'TVD oJ
(MPS-19) 9
8027.66' MD, 4368.05' TVD ø
12/100' : 7800' MD, 4336.51 'TVD
9949.7' MD, 4321.5' TVD
lir 4/100' : 9844.17' MD,4324.92'TVD
\
\1I'S- J 9 OA End'Dir : 9166.84' MD, 4342.06' TVD
Stut Jir 4/1 00' : 9120.7\' MD, 4342.72'TVD
~. illSd9--'>A.D
'/000
All TVD depths are
ssTVD plus 66.5'for RKBE.
I
200
I
800
400
MP'S- l} OA
TS-19 (PI.. \WS-I9<U) í
-800 -400 0
West(-)lEast(+) [400ft/in]
7200
--
6800
6400
6000
:s
2:
o
o
:!.
+'
~
~
:c
:;
o
en
200
5600
)
BP
KW A Planning Report MAP
Company:
Field:
Site:
Well:
Wellpath:
BP Amoco
Milne Point
MPt S Pad
MPS-19
PlanMPS-19A
Date: 11/18/2002",>, ",.Time: 11:00:47 Page:
ÇO~l'dinate(NE)Re(erence: W~II.: MPS~19"True North
Vertical(TVD):Refer~nce: RB66:50·66.5
Section(VS)Ref~renc~: Well (0.OON,O.QOE,352.17 Azi)
SUn'eyCalc~dationMethod: MinimumCurvature Db: Oracle
Field: Milne Point
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Geo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
Map Zone:
Coordinate System:
Geomagnetic Model:
Site: M Pt S Pad
Site Position:
From: Map
Position Uncertainty:
Ground Level:
5999978.00 ft
566345.00 ft
Northing:
Easting:
Latitude:
Longitude:
North Reference:
Grid Convergence:
0.00 ft
0.00 ft
Well:
MPS-19
Slot Name:
Well Position: +N/-S 2.01 ft Northing: 5999975.31 ft
+E/-W -528.99 ft Easting: 565816.06 ft
Position Uncertainty: 0.00 ft
Latitude:
Longitude:
Wellpath: Plan MPS-19A
Drilled From:
Tie-on Depth:
Above System Datum:
Declination:
Mag Dip Angle:
+E/-W
ft
0.00
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
RB 66.50
10/21/2002
57503 nT
Depth From (TVD)
ft
0.00
+N/-S
ft
0.00
Height 66.50 ft
Plan: MPS-19A wp02
Date Composed:
Version:
Tied-to:
Principal: Yes
Casing Points
)
Alaska, Zone 4
Well Centre
BGGM2002
70 24 37.329 N
149 27 35.171 W
True
0.51 deg
70 24 37.348 N
149 27 50.676 W
MPS-19
7800.00 ft
Mean Sea Level
25.71 deg
80.80 deg
Direction
deg
352.17
10/21/2002
5
From: Definitive Path
MD TVD Diameter Hole Size Name
ft ft in in
10634.76 4294.49 4.500 6.125 41/2"
Formations
MD TVD Formations Lithology Dip Angle Dip Direction
ft ft deg deg
0.00 NF 0.00 0.00
7811.15 4340.50 OA 0.00 0.00
0.00 TSBC 0.00 0.00
Targets
Map Map <-- Latitude ---> <-- Longitude --->
Name Description TVD +N/-S +E/-W Northing Easting Deg Min See Deg Min Sec
Dip. Dir. ft ft ft ft ft
MPS-19 OA T4 4294.50 7982.43 -1097.87 6007947.00 564648.00 70 25 55.853 N 149 28 22.890 W
MPS-19 OA T3 4321.50 7389.34 -756.05 6007357.00 564995.00 70 25 50.021 N 149 28 12.858 W
MPS-19 OA T1 4342.50 6250.36 19.02 6006225.00 565780.00 70 25 38.819 N 149 2750.118 W
MPS-19 OA T2 4342.50 6722.31 -308.87 6006694.00 565448.00 70 25 43.461 N 149 27 59.737 W
) BP )
KW A Planning Report MAP
Company: BP Amoco Date: 11118/2002 Time: 11:00:47 Page: 2
Fiëld: Milne Point Co-Ordillate(NE)Reference: VVell:MPS~t9, True North
Site: M PtSPad V ertical {TVI»~eferellce: RB66:5066.5
Well: MPS"19 Section (VS} Referenc~: Well (0.OON,O.00E,352.17Azi)
Wellpath: Plan MPS-19A Survey Calculation Metho& Minimum Curvature Db: Oracle
Plan Section Information
MD lnel Azim TVD +N/~S +E/~W DLS" '. ..BUild. ',.Turri TEO Target
ft deg deg ft ft ft degl1 OOff·, deg/1QOftdeg/100ft (jeg
7800.00 68.36 331.03 4336.51 5603.05 427.94 0.00 0.00 0.00 0.00
7820.00 70.76 331.03 4343.49 5619.44 418.87 12.00 12.00 0.00 0.00
8027.66 95.56 328.55 4368.05 5796.16 315.85 12.00 11.94 -1.19 -5.86
8238.28 95.56 328.55 4347.65 5975.01 206.48 0.00 0.00 0.00 0.00
8346.61 89.98 325.21 4342.42 6065.58 147.39 6.00 -5.15 -3.09 -148.99
8571.61 89.98 325.21 4342.50 6250.36 19.02 0.00 0.00 0.00 0.00 MPS-19 OA T1
8571.68 89.98 325.21 4342.50 6250.42 18.98 4.00 -4.00 0.02 179.70
9120.71 89.98 325.21 4342.72 6701.31 -294.28 0.00 0.00 0.00 0.00
9146.28 91.00 325.21 4342.50 6722.31 -308.87 4.00 4.00 0.00 -0.04 MPS-19 OA T2
9166.84 91.45 325.90 4342.06 6739.27 -320.50 4.00 2.19 3.35 56.80
9844.17 91.45 325.90 4324.92 7299.94 -700.13 0.00 0.00 0.00 0.00
9949.70 92.26 330.04 4321.50 7389.34 -756.05 4.00 0.77 3.93 78.88 MPS-19 OA T3
10634.77 92.26 330.04 4294.50 7982.43 -1097.87 0.00 0.00 0.00 0.00 MPS-19 OA T4
Survey
MD loci Azim· TVD SysTVO · MapN .,Map:t£ VS DLS TEO Tool/Comment
ft deg deg ft ft ft ft. ft deg/1 QOft deg
7800.00 68.36 331.03 4336.51 4270.01 6005581.38 566194.58 5492.48 0.00 0.00 MWD+IFR+MS
7811.15 69.70 331.03 4340.50 4274.00 6005590.44 566189.45 5502.19 12.00 0.00 OA
7820.00 70.76 331.03 4343.49 4276.99 6005597.69 566185.36 5509.96 12.00 360.00 MWD+IFR+MS
7825.00 71.35 330.97 4345.12 4278.62 6005601.81 566183.03 5514.37 12.00 354.14 MWD+IFR+MS
7850.00 74.34 330.65 4352.49 4285.99 6005622.55 566171.19 5536.62 12.00 354.16 MWD+IFR+MS
7875.00 77.32 330.34 4358.61 4292.11 6005643.54 566159.07 5559.14 12.00 354.25 MWD+IFR+MS
7900.00 80.31 330.04 4363.46 4296.96 6005664.70 566146.70 5581.88 12.00 354.33 MWD+IFR+MS
7925.00 83.30 329.75 4367.02 4300.52 6005686.00 566134.10 5604.78 12.00 354.39 MWD+IFR+MS
7950.00 86.28 329.45 4369.29 4302.79 6005707.35 566121.31 5627.76 12.00 354.43 MWD+IFR+MS
7975.00 89.27 329.16 4370.26 4303.76 6005728.72 566108.38 5650.78 12.00 354.46 MWD+IFR+MS
8000.00 92.25 328.88 4369.93 4303.43 6005750.03 566095.33 5673.76 12.00 354.47 MWD+IFR+MS
8025.00 95.24 328.58 4368.30 4301.80 6005771.23 566082.19 5696.65 12.00 354.46 MWD+IFR+MS
8027.66 95.56 328.55 4368.05 4301.55 6005773.48 566080.79 5699.07 12.00 354.45 MWD+IFR+MS
8100.00 95.56 328.55 4361.04 4294.54 6005834.57 566042.69 5765.04 0.00 0.00 MWD+IFR+MS
8200.00 95.56 328.55 4351.36 4284.86 6005919.01 565990.03 5856.24 0.00 0.00 MWD+IFR+MS
8238.28 95.56 328.55 4347.65 4281.15 6005951.34 565969.87 5891.15 0.00 0.00 MWD+IFR+MS
8250.00 94.95 328.19 4346.58 4280.08 6005961.22 565963.66 5901.83 6.00 211.01 MWD+IFR+MS
8300.00 92.38 326.65 4343.38 4276.88 6006003.01 565936.42 5947.14 6.00 210.98 MWD+IFR+MS
8346.61 89.98 325.21 4342.42 4275.92 6006041.37 565909.99 5988.93 6.00 210.88 MWD+IFR+MS
8400.00 89.98 325.21 4342.44 4275.94 6006084.95 565879.14 6036.52 0.00 0.00 MWD+IFR+MS
8500.00 89.98 325.21 4342.48 4275.98 6006166.56 565821.37 6125.65 0.00 0.00 MWD+IFR+MS
8571.61 89.98 325.21 4342.50 4276.00 6006225.00 565780.00 6189.48 0.00 0.00 MPS-19 OA T1
8571.68 89.98 325.21 4342.50 4276.00 6006225.06 565779.96 6189.54 4.00 179.70 MWD+IFR+MS
8600.00 89.98 325.21 4342.51 4276.01 6006248.17 565763.59 6214.79 0.00 180.00 MWD+IFR+MS
8700.00 89.98 325.21 4342.55 4276.05 6006329.78 565705.82 6303.92 0.00 180.00 MWD+IFR+MS
8800.00 89.98 325.21 4342.59 4276.09 6006411.40 565648.05 6393.05 0.00 180.00 MWD+IFR+MS
8900.00 89.98 325.21 4342.63 4276.13 6006493.01 565590.28 6482.19 0.00 180.00 MWD+IFR+MS
9000.00 89.98 325.21 4342.67 4276.17 6006574.62 565532.51 6571.32 0.00 180.00 MWD+IFR+MS
9100.00 89.98 325.21 4342.71 4276.21 6006656.23 565474.73 6660.45 0.00 180.00 MWD+IFR+MS
9120.71 89.98 325.21 4342.72 4276.22 6006673.13 565462.77 6678.91 0.00 180.00 MWD+IFR+MS
9146.28 91.00 325.21 4342.50 4276.00 6006694.00 565448.00 6701.70 4.00 359.96 MPS-19 OA T2
9166.84 91.45 325.90 4342.06 4275.56 6006710.85 565436.22 6720.08 4.00 56.80 MWD+IFR+MS
9200.00 91.45 325.90 4341.22 4274.72 6006738.13 565417 .40 6749.81 0.00 180.00 MWD+IFR+MS
9300.00 91.45 325.90 4338.69 4272.19 6006820.40 565360.63 6839.45 0.00 180.00 MWD+IFR+MS
9400.00 91 .45 325.90 4336.16 4269.66 6006902.67 565303.86 6929.09 0.00 180.00 MWD+IFR+MS
9500.00 91.45 325.90 4333.63 4267.13 6006984.95 565247.09 7018.73 0.00 180.00 MWD+IFR+MS
9600.00 91 .45 325.90 4331.10 4264.60 6007067.22 565190.32 7108.38 0.00 180.00 MWD+IFR+MS
9700.00 91 .45 325.90 4328.57 4262.07 6007149.49 565133.55 7198.02 0.00 180.00 MWD+IFR+MS
Company: BPArnoco
Field: Milne Point
Site: M PtSPad
Well: MPS-19
Wellpath: Plan MPS-t9A
Survey
MD Inel Azim
ft deg d~g
9800.00 91.45 325.90
9844.17 91.45 325.90
9900.00 91.88 328.09
9949.70 92.26 330.04
10000.00 92.26 330.04
10100.00 92.26 330.04
10200.00 92.26 330.04
10300.00 92.26 330.04
10400.00 92.26 330.04
10500.00 92.26 330.04
10600.00 92.26 330.04
10634.77 92.26 330.04
)
)
BP
KW A Planning Report MAP
Date: '.". ,,11/l8/4002 Time; 11 :00:47 Page: 3
Co-ordinate(NE}R~ference:· Well:.MPS-19;T(ue North
Vertical(TVQ)R,~ferel1ce: RB 66.5066.5
S~tion (VS) R~f~rence: W~II(0.00N0.00E.352. 17 Azi)
Survey,J:alculaµouMethod: Minimum Curvature Db: Oracle
TVD SysTVD MapN MapE VS ÐLS TF.o Tool/Comment
ft ft ,ft ft ,ft degttpOff '··deg
4326.04 4259.54 6007231.77 565076.78 7287.66 0.00 180.00 MWD+IFR+MS
4324.92 4258.42 6007268.10 565051.70 7327.26 0.00 180.00 MWD+IFR+MS
4323.30 4256.80 6007314.63 565020.90 7377.76 4.00 78.88 MWD+IFR+MS
4321.50 4255.00 6007357.00 564995.00 7423.44 4.00 78.94 MPS-19 OA T3
4319.52 4253.02 6007400.32 564969.52 7470.00 0.00 0.00 MWD+IFR+MS
4315.57 4249.07 6007486.44 564918.87 7562.57 0.00 0.00 MWD+IFR+MS
4311.63 4245.13 6007572.56 564868.22 7655.13 0.00 0.00 MWD+IFR+MS
4307.69 4241.19 6007658.69 564817.57 7747.70 0.00 0.00 MWD+IFR+MS
4303.74 4237.24 6007744.81 564766.91 7840.26 0.00 0.00 MWD+IFR+MS
4299.80 4233.30 6007830.93 564716.26 7932.82 0.00 0.00 MWD+IFR+MS
4295.86 4229.36 6007917.05 564665.61 8025.39 0.00 0.00 MWD+IFR+MS
4294.50 4228.00 6007947.00 564648.00 8057.58 0.00 0.00 MPS-19 OA T4
MPS-19a liner lap dispensation
)
Subject: MPS-19a liner lap dispensation 2-02.- 'l.A!) t.f
Date: Fri, 6 Dee 2002 11 :42: 19 -0600
From: "Campbell, Steve K" <CampbelS@BP.eom>
To: "Winton Aubert (E-mail)..<winton_aubert@admin.state.ak.us>
)
Winton,
This well has been planned as a dual sidetrack into the Schrader Bluff
"OA" sand. Because both laterals will be in the "OA" the distance from the ./'
top of the liner in the lower and the top of the window for the upper
requires us to only have 50' of liner lap in the first lateral to allow for
enough room to install a whipstock.
The liner hanger with liner that will be run in the hole is slotted and
should be considered completion equipment not casing.
Please consider this email for a dispensation from state regulation 20 AAC
25.030 which requires a minimum 100' liner lap.
Thanks!
Steve Campbell
907-564-4401(0)
907-564-4441(f)
campbels@bp.com
P054961
DATE
INVOICE / CREDIT MEMO
11/18/0~ INV# CKll1402B
--rYlP5- JqA~ LI
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
BP EXPLORATION, (ALASKA) INC.
PRUDHOE BAY UNIT
PO BOX 196612
ANCHORAGE, AK 99519-6612
PAY
DESCRIPTION
PERMIT TO DRILL FEE
TOTAL ~
DATE
CHECK NO.
TO THE
ORDER
OF
ALASKA OIL & GAS CONSERVATIÚN
COMMISSION
333 W. 7th AVF:, STE 100 ',.
ANCHORAGE, AK 99501
GROSS
11/18/02
VENDOR
DISCOUNT
NET
P054961
H
~ECEIVED
DEC 0 6 2002
AlasKa Oil & Gas Gons. Commisso on
Anchorage
--
NATIONAL CITY BANK
Ashland, Ohio
No. P 054961
56-389
412
CONSOLIDATED COMMERCIAL ACCOUNT
,~
/J~".,., p'.,', C, .l]',~," Æ",·.. ~ I,m!. "flth¡,x,'" l·'·',ï",·".~"."'O·,'·,:,,, ",t::",'",,',(.
.- :- J¡,¡,. 1. l t .~-~-J- .,1"_' --'<--: _. -0_-1"
,'..~,. '~.' ,', Of. flU' 'III' ......,.trn..j....
DATE
AMOUNT
18,2002p ****$~oo.nb****
. -. .--- -----.
Nò~r::;~;;~~;~;;*;::~{:;:;d
Ji'Z'<:~~'{~~~t~Q~~;~I~;~:~;~~.iri
1110 5 ~ g b ~ III I: 0 ~ ~ 2 0 ~ a g 51: 0 ~ 2 7 B g bill
)
)
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERJP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME
PTD#
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MUL TI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function· of the original API number stated
above.
HOLE In accordance with 20 AAC 25.005(f), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\jody\templates
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target lones.
WELL PERMIT CHECKLIST COMPANY fVJ ~ WELL NAME 1'f1'4 ,If/' S - / 1 rJ
FIELD & POOL .52,5,/ q,ð INIT CLASS ()t:L¿/ / -d, ï
ADMINISTRATION 1. Permittee attached. . . . . . . . . . . . . . . . . . . . . . .
2. Lease number appropriate. . . . . . . . . . . . . . . . . . .
3. Unique well name and number. . . . . . . . . . . . . . . . .
4. Well located in a defined pool.. . . . . . . . . . . . . . . . .
5. Well located proper distance from drilling unit boundary.
6. Well located proper distance from other wells.. . . . . . . . .
APPR DATE 7. Sufficient acreage available in drilling unit.. . . . . . . . . . .
~/)r ..... Ir-. / 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . .
All-- ~ð2- 9. Operator only affected party.. . . . . . . . . . . . . . . . . .
10. Operator has appropriate bond in force. . . . . . . . . . . . .
11. Permit can be issued without conservation order. . . . . . . .
12. Permit can be issued without administrative approval.. . . . .
(Service Well Only) 13. Well located w/in area & strata authorized by injection order #_
(Service Well Only) 14. All wells wlin X mile area of review identified. . . . . . ..
ENGINEERING
APPR DATE
ilJGA-- 12/2'S/ ð ~t"
(Service Well Only)
GEOLOGY
APPR DATE
11/- /z/ ~2-
(Exploratory Õ~ly)
15. Conductor string provided. . . . . . . . . . . . . . . . . . .
16. Surface casing protects all known USDWs. . . . . . .
17. CMT vol adequate to circulate on conductor & surf csg. . .
18. CMT vol adequate to tie-in long string to surf csg. . . . . .
19. CMT will cover all known productive horizons. . . . . . . .
20. Casing designs adequate for C, T, B & permafrost. . . . .
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . .
22. If a re-drill, has a 10-403 for abandonment been approved.
23. Adequate wellbore separation proposed.. . . . . . '.' . . . .
24. If diverter required, does it meet regulations. .. . . . . . . .
25, Drilling fluid program schematic & equip list adequate. . . . .
26. BOPEs, do they meet regulation. . . . . ;;' . . . . . . . . .
27. BOPE press rating appropriate; testto .:..,OO() psig.
28. Choke manifold complies w/API RP-53 (May 84). . . . . . . .
29. Work will occur without operation shutdown. . . . . . . . . . .
30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . .
31. Mechanical condition of wells within AOR verified. . . . . . . .
32. Permit can be issued wlo hydrogen sulfide measures. . . . .
33. Data presented on potential overpressure zones. . . . . . . .
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . .
35. Seabed condition survey (if off-shore)., . . . . .. ......
36. Contact name/phone for weekly progress reports. ......
PROGRAM: Exp _ Dev _ Redrll X- Re-Enter _ Serv _ Well bore seg _
GEOL AREA ~ ~ 7C> UNIT# /1 3? <{ ON/OFF SHORE ~
,y' N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
~ N
~ /U~.
y......N--
Y-N-
¥-N-N/A-
,~ s!o;fu/
~~ I)~O'- It/-
-*@~ l ,
,.J/I\-
I' .. ~ I/.t et.iL· ¡tIki q I 'L f f7 .
N m s. I;;> I 5 i (;; f ( / " .
. N
ii>1\ijA--
G)N
Y N
Y /U./t.
Y N
N
"\
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR UIC ENGINEER COMM ISSIONER: Comments/Instructions:
RP#C TEM JDH JBR COT ''''/dL3!c ~
DTS \,,»)2..3/0 <-
.-/ MJW MLB Iz.¡Z:J/O'2...
SFD_ WGA
Rev: 10/15/02
G:\geology\permits\checklist.doc
)
)
Well History File
APPENDIX
Inforrnation of detailed nature that is not
particularly germane to the Well Pennitting Process
but is part of the history file. ,
To inlprove the readability of the Well History file and to
sinlplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of infonnation.
)
')
c:toa -a33
11515
Sperry-Sun Drilling Services
LIS Scán Utility
$Revision: 3 $
LisLib $Revision: 4 $
Thu Feb 13 14:26:51 2003
Reel Header
Service name. . . . . . . . . . . . .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 03 / 02 / 13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name.... ........... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name. ........... .LISTPE
Date.................... .03/02/13
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments............... ..STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Schrader Bluff
MWD / MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-19A
500292312101
BP Exploration, Alaska
Sperry-Sun Drilling Services
13-FEB-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 1
!AKMW30008
T. MCGUIRE
C. DIXON
MWDRUN 2
!AKMW30008
T. MCGUIRE
C. DIXON
MWDRUN 3
!AKMW30008
T. MCGUIRE
C. DIXON
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 4
!AKMW30008
T. MCGUIRE
C. DIXON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
3308
195
72.20
33.70
)
)
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6.125 7.000 7812.0
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MPS-19A WAS EFFECTED BY MEANS OF AN OPEN-HOLE
SIDETRACK FROM WITHIN
THE MPS-19A PB1 WELLBORE, AT A DEPTH OF ABOUT
9174'MD/4332'TVD.
4. MWD RUN 1 COMPRISED DUAL GAMMA RAY (DGR) UTILIZING
GEIGER-MUELLER TUBE
DETECTORS. THIS WAS A TIE-IN RUN FROM
7981'MD/4374'TVD TO 7559'MD/4208'
TVD. THE SROP DATA ABOVE MWD RUN 2 INTERVAL (7812'MD
TO 7560'MD) ARE
ACTUALLY TOOL RUNNING SPEED VALUES.
5. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR. THE
PURPOSE OF THIS RUN WAS
TO ORIENT THE WHIPSTOCK, THE TOP OF WHICH WAS
POSITIONED AT 7812'MD
AND THE BOTTOM WAS AT 7824'MD.
6. MWD RUNS 3 & 4 COMPRISED DIRECTIONAL WITH DGR¡
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4) ¡ AND AT-BIT INCLINATION
(ABI) .
7. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 2/11/03. MWD DATA
ARE CONSIDERED
PDC.
8. MWD RUNS 1, 2, PART OF 3, AND 4 REPRESENT WELL
MPS-19A WITH API#:
50-029-23121-01. THIS WELL REACHED A TOTAL DEPTH
(TD) OF 10200'MD/
4274'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
')
)
File Header
Service name............ .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..03/02/13
Maximum Physical Record. .65535
File Type. . . . . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
7558.0
7560.0
7800.5
7800.5
7800.5
7800.5
7800.5
STOP DEPTH
10145.0
10199.5
10152.0
10152.0
10152.0
10152.0
10152.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
1
2
3
4
MERGED MAIN PASS.
$
MERGE TOP
7558.0
7812.0
7836.0
9174.5
MERGE BASE
7812.0
7836.0
9174.0
10199.5
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units....;..... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
)
)
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7558 10199.5 8878.75 5284 7558 10199.5
ROP MWD FT/H 0.08 583.37 170.885 5280 7560 10199.5
GR MWD API 21.58 123.55 74.5562 5175 7558 10145
RPX MWD OHMM 0.3 1736.8 28.1144 4704 7800.5 10152
RPS MWD OHMM 0.51 2000 30.644 4704 7800.5 10152
RPM MWD OHMM 1.51 2000 38.3087 4704 7800.5 10152
RPD MWD OHMM 2.59 2000 37.505 4704 7800.5 10152
FET MWD HOUR 0.213 29.67 0.921948 4704 7800.5 10152
First Reading For Entire File......... .7558
Last Reading For Entire File.......... .10199.5
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type............ . . . . LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type.. . .. .. .. .... .. .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
7558.0
7560.0
STOP DEPTH
7749.0
7812.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
19-JAN-03
Insite
66.32
Memory
7812.0
7558.0
7812.0
')
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............ ..Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.0
.0
TOOL NUMBER
65041
6.125
7812.0
Water
9.10
63.0
9.0
33500
4.0
Based
.000
.000
.000
.000
Name Service Order
DEPT
ROP MWD010
GR MWD010
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
)
.0
84.2
.0
.0
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7558 7812 7685 509 7558 7812
ROP MWD010 FT/H 0.12 4.87 4.21543 505 7560 7812
GR MWD010 API 21.58 74.5 51.9079 383 7558 7749
First Reading For Entire File........ ..7558
Last Reading For Entire File.......... .7812
')
)
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type.. . . . . . . . . . . . . . . LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type.............. . . LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
7749.5
7812.5
STOP DEPTH
7773.0
7836.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
19-JAN-03
Insite
66.32
Memory
7836.0
7812.0
7836.0
68.4
68.4
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
TOOL NUMBER
65041
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
6.125
7812.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
Water Based
9.10
63.0
)
)
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
9.0
33500
4.0
.000
77.000
.000
.000
.0
84.2
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD020
GR MWD020
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7749.5 7836 7792.75 174 7749.5 7836
ROP MWD020 FT/H 0.08 25.61 10.1931 48 7812.5 7836
GR MWD020 API 55.44 74.93 64.6935 48 7749.5 7773
First Reading For Entire File......... .7749.5
Last Reading For Entire File.......... .7836
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name........... ..STSLIB.004
')
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
4
)
header data for each bit run in separate files.
3
.5000
START DEPTH
7773.5
7800.5
7800.5
7800.5
7800.5
7800.5
7836.5
STOP DEPTH
9174.0
9174.0
9174.0
9174.0
9174.0
9174.0
9174.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
20-JAN-03
Insite
66.32
Memory
9174.0
7836.0
9174.0
68.3
93.5
TOOL NUMBER
65041
148574
6.125
7812.0
Water Based
9.20
60.0
9.0
33500
4.0
.300
.210
.270
.300
65.0
95.0
65.0
65.0
)
)
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7773.5 9174 8473.75 2802 7773.5 9174
ROP MWD030 FT/H 1.62 583.37 204.337 2676 7836.5 9174
GR MWD030 API 52.51 104.23 74.0636 2802 7773.5 9174
RPX MWD030 OHMM 0.3 1313.86 28.8082 2748 7800.5 9174
RPS MWD030 OHMM 0.51 1313.93 30.5567 2748 7800.5 9174
RPM MWD030 OHMM 1.51 2000 44.5127 2748 7800.5 9174
RPD MWD030 OHMM 2.59 2000 44.3007 2748 7800.5 9174
FET MWD030 HOUR 0.22 29.67 1.2081 2748 7800.5 9174
First Reading For Entire File......... .7773.5
Last Reading For Entire File.......... .9174
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name.... ........ .STSLIB.005
Service Sub Level Name...
)
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
GR
ROP
FET
$
5
)
header data for each bit run in separate files.
4
.5000
START DEPTH
9174.5
9174.5
9174.5
9174.5
9174.5
9174.5
9174.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
10152.0
10152.0
10152.0
10152.0
10145.0
10199.5
10152.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
21-JAN-03
Insite
66.32
Memory
10200.0
9174.0
10200.0
90.3
102.8
TOOL NUMBER
65041
148574
6.125
7812.0
Water Based
9.20
62.0
9.0
28000
3.0
.300
.210
.270
.320
65.0
95.0
65.0
65.0
)
')
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9174.5 10199.5 9687 2051 9174.5 10199.5
ROP MWD040 FT/H 1.43 429.67 172.038 2051 9174.5 10199.5
GR MWD040 API 46.51 123.55 79.9774 1942 9174.5 10145
RPX MWD040 OHMM 5.47 1736.8 27.1396 1956 9174.5 10152
RPS MWD040 OHMM 5.65 2000 30.7666 1956 9174.5 10152
RPM MWD040 OHMM 5.83 1067.04 29.5927 1956 9174.5 10152
RPD MWD040 OHMM 6.01 880.67 27.9576 1956 9174.5 10152
FET MWD040 HOUR 0.213 14.5666 0.519929 1956 9174.5 10152
First Reading For Entire File......... .9174.5
Last Reading For Entire File.. ........ .10199.5
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.006
Physical EOF
Tape Trailer
Service name. . . . . . . . . . . . .LISTPE
Da te. . . . . . . . . . . . . . . . . . . . .03/02/13
Origin. . . . . . . . . . . . . . . . . . . STS
) )
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/02/13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... .UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
physical EOF
End Of LIS File
)
)
aDa-;) 3~
J/5/tp
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Thu Feb 13 08:08:18 2003
Reel Header
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/02/13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Tape Header
Service name. . . . . . . . . . . . .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/02/13
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Schrader Bluff
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
MPS-19APBl
500292312170
BP Exploration, Alaska
Sperry-Sun Drilling Services
13-FEB-03
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWDRUN 1
MW3000800000
T. MCGUIRE
C. DIXON
MWD RUN 2
MW3000800000
T. MCGUIRE
C. DIXON
MWDRUN 3
MW3000800000
T. MCGUIRE
C. DIXON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
12
12N
10E
3308
195
72.20
33.70
#
WELL CASING RECORD
1ST STRING
2ND STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6.125 7.000 7812.0
)
)
3RD STRING
PRODUCTION STRING
#
REMARKS:
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 COMPRISED DUAL GAMMA RAY (DGR) UTILIZING
GEIGER-MUELLER TUBE
DETECTORS. THIS WAS A TIE-IN RUN FROM
7981'MD/4374'TVD TO 7559'MD/4208'
TVD. THE SROP OVER THIS INTERVAL (7812'MD TO
7560'MD) IS ACTUALLY TOOL
RUNNING SPEED.
4. MWD RUN 2 COMPRISED DIRECTIONAL WITH DGR. THIS RUN
WAS TO ORIENT THE
WHIPSTOCK, THE TOP OF WHICH WAS POSITIONED AT
7812'MD AND THE BOTTOM
WAS AT 7824'MD.
5. MWD RUN 3 COMPRISED DIRECTIONAL WITH DGR¡
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4) ¡ AND AT-BIT INCLINATION
(ABI) .
6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER
E-MAIL FROM D.
SCHNORR, BP ALASKA, INC., DATED 2/11/03. MWD DATA
ARE CONSIDERED
PDC.
7. MWD RUNS 1, 2, AND 3 REPRESENT WELL MPS-19A PB1 WITH
API#: 50-029-
23121-70. THIS WELL REACHED A TOTAL DEPTH (TD) OF
10143'MD/4342'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
FET
RPD
RPM
RPS
RPX
$
)
)
clipped curves; all bit runs merged.
.5000
START DEPTH
7558.0
7560.0
7800.5
7800.5
7800.5
7800.5
7800.5
STOP DEPTH
10088.5
10143.0
10095.5
10095.5
10095.5
10095.5
10095.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
#
REMARKS:
BIT RUN NO
1
2
3
MERGED MAIN PASS.
$
MERGE TOP
7558.0
7812.0
7836.0
MERGE BASE
7812.0
7836.0
10143.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7558 10143 8850.5 5171 7558 10143
ROP MWD FT/H 0.08 583.37 179.361 5167 7560 10143
GR MWD API 21.58 118.1 72.2545 5062 7558 10088.5
RPX MWD OHMM 0.3 1313.86 28.2671 4591 7800.5 10095.5
RPS MWD OHMM 0.51 1313.93 30.0808 4591 7800.5 10095.5
RPM MWD OHMM 1.51 2000 38.7294 4591 7800.5 10095.5
RPD MWD OHMM 2.59 2000 37.7438 4591 7800.5 10095.5
FET MWD HOUR 0.22 29.67 0.917471 4591 7800.5 10095.5
)
)
First Reading For Entire File......... .7558
Last Reading For Entire File.......... .10143
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type.............. ..LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type........... . ... .LO
Previous File Name...... .STSLIB.001
Cormnent Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
7558.0
7560.0
STOP DEPTH
7749.0
7812.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
19-JAN-03
Insite
66.32
Memory
7812.0
7558.0
7812.0
.0
.0
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
TOOL NUMBER
65041
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
6.125
7812.0
#
)
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
Optical log depth units. . . . . . . . . . .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
)
Water
9.10
63.0
9.0
33500
4.0
Based
.000
.000
.000
.000
.0
84.2
.0
.0
Name Service Order
DEPT
ROP MWD010
GR MWD010
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7558 7812 7685 509 7558 7812
ROP MWD010 FT/H 0.12 4.87 4.21543 505 7560 7812
GR MWD010 API 21.58 74.5 51.9079 383 7558 7749
First Reading For Entire File......... .7558
Last Reading For Entire File.......... .7812
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type............... .LO
Next File Name..... ..... .STSLIB.003
)
Physical EOF
File Header
Service name.......... ...STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type.... . . . . . . . . . . . . LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
)
header data for each bit run in separate files.
2
.5000
START DEPTH
7749.5
7812.5
STOP DEPTH
7773.0
7836.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
19-JAN-03
Insite
66.32
Memory
7836.0
7812.0
7836.0
68.4
68.4
TOOL NUMBER
65041
6.125
7812.0
Water Based
9.10
63.0
9.0
33500
4.0
.000
77.000
.000
.000
.0
84.2
.0
.0
)
)
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record........... ..Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD020
GR MWD020
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7749.5 7836 7792.75 174 7749.5 7836
ROP MWD020 FT/H 0.08 25.61 10.1931 48 7812.5 7836
GR MWD020 API 55.44 74.93 64.6935 48 7749.5 7773
First Reading For Entire File......... .7749.5
Last Reading For Entire File.......... .7836
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type.. .. .. .. .. .. .. .. LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
4
header data for each bit run in separate files.
3
')
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPD
RPM
RPS
RPX
FET
ROP
$
.5000
START DEPTH
7773.5
7800.5
7800.5
7800.5
7800.5
7800.5
7836.5
STOP DEPTH
10088.5
10095.5
10095.5
10095.5
10095.5
10095.5
10143.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER ( FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction. . . . . . . . . . . . . . . . . Down
)
20-JAN-03
Insite
66.32
Memory
10143.0
7836.0
10143.0
68.3
93.5
TOOL NUMBER
65041
148574
6.125
7812.0
Water Based
9.20
60.0
9.0
33500
4.0
.000
.000
.000
.000
.0
95.0
.0
.0
)
)
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value. . . . . . . . . . . . . . . . . . . . . . -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7773.5 10143 8958.25 4740 7773.5 10143
ROP MWD030 FT/H 1.62 583.37 200.29 4614 7836.5 10143
GR MWD030 API 45.84 118.1 74.0156 4631 7773.5 10088.5
RPX MWD030 OHMM 0.3 1313.86 28.2671 4591 7800.5 10095.5
RPS MWD030 OHMM 0.51 1313.93 30.0808 4591 7800.5 10095.5
RPM MWD030 OHMM 1.51 2000 38.7294 4591 7800.5 10095.5
RPD MWD030 OHMM 2.59 2000 37.7438 4591 7800.5 10095.5
FET MWD030 HOUR 0.22 29.67 0.917471 4591 7800.5 10095.5
First Reading For Entire File......... .7773.5
Last Reading For Entire File.......... .10143
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation...... .03/02/13
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
Tape Trailer
Service name. . . . . . . . . . . . .LISTPE
Date.................... .03/02/13
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 03 / 02 / 13
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
) ')
Comments................ .STS LIS Writing Library. Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File