Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout194-063ON OR Bt FORE ULUGG!NG = LOC..__ON CT;EAR~TCE REPORT St-ate of Alaska . ALAS~ 0iL & GAS C~'~SERVATION COHHISSION Review the well file, and-c~'~-~.~= on plugging, well head Well hea~ =a= off: conclusions: Signed · · · i. s I%e,v STATE OF ALASKA ALASK/~, .: AND GAS CONSERVATION COMrv,,,.,SION WELL COMPLETION OR REOOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 194-063 300-234 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 ,~ 50-029-22474-00 4. Location of well at surface ~.~,~;,~ .~w. ,~j 9. Unit or Lease Name 1428' SNL, 945' EWL, SEC. 22, T11 N, R14E, UM ¥~.~ ~ Prudhoe Bay Unit At top of productive interval 485' NSL, 1189' EWL, SEC. 14, T11N, R14E, UM At total depth t .,, 10. Well Number 521' NSL, 1445' EWL, SEC. 14, T11N, R14E, UM 15-34 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE = 65.45' ADL 028307 12. Date Spudded04/28/1994 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'05/16/1994 9/17/2000 J 15. Water depth, if offshoreN/A MSL 116' N°' °f C°mpleti°nsZero 17. Total11310Depth (MD+TVD)118'9035 FT Plug Back Depth (MD+TVD)i 1232 8962 FT1119' Directi°nal Survey I 20'[] Yes ~ No Depth where SSSV setl 21' Thickness °f Permafr°stN/A MD 1900' (Approx.) 22. Type Electric or Other Logs Run DIL/SONIC/GR/CNL 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO-I-I'OM S~ZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 30' 110' 30" 260 sx Arctic Set (Approx.) 10-3/4" 45.5# NT-80 36' 3813' 13-1/2" 1100 sx PF 'E', 375 sx Class 'G' 7-5/8" 29.7# NT95HS 32' 10572' 9-7/8" 532 sx Class 'G' 5-1/2" 17# 13Cr80 10414' 11310' 6-3/4" !130 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 10417' 10354' MD TVD MD TVD RECEIVED 26. AC,D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10850' Set whipstock \j 0 2000 10850' P&A with 22 Bbls Class 'e', Sqzd to 1000 ps, Ala~a 0il & Gas C0~s. Commission 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BEE GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO ~TEST PERIOD I Flow Tubing Casing Pressure !CALCULATED OIL-BEE GAS-MCF WATER-BEE OIL GRAVITY'API (CORR) Press. 24-Hour RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 ORIGINAL Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Sag River 10495' 8283' Shublik 10566' 8347' Top of Sadlerochit 10629' 8405' Zone 3 10756' 8521' Zone 2C 10820' 8580' RECEIVED NOV 0 9 2000 AlaSka Oil & Gas Coas. Oommis,~n Anchorage 31. List of Attachments: Summary of Daily Ddlling Reports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble //]'~j~..,~ ~ Title TechnicalAssistant Date 15-34 194-063 300-234 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No./Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. iTEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. iTEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submitla separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no core9 taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well: 15-34A Accept: 09/18/00 Field: Prudhoe Bay Spud: 09/19/00 APl: 50-029-22474-01 Release: 09/28/00 Permit: 200-137 CTD Unit: Nordic #1 PRE-RIG WORK 09/08/00 TIFL, passed. MITIA, passed. 09~09~00 Drifted tubing with dummy whipstock to 11154'. POOH, RDMO. 09/13~OO Ran PDS caliper survey from 10520' wlm. 09/16/00 MIRU DS CTU #8. Pick up cement nozzle. PT stack. 09/17/00 Continued from 09/16/00. Set whipstock at 10850'. Kill well. RIH tag whipstock at 10856'. Set 2K lbs. on whipstock to confirm set. Held. Mix and pump cement to abandon the lower wellbore prior to sidetrack. Pumped 2 bbls neat, 15 bbls with 15 ppb aggregate, 5 bbls neat. Build 1000 psi squeeze pressure. Placed -3 bbls behind pipe, lay in remainder. Hold for 30 minutes. Drop ball, contaminate and circulate out excess cement, washing jewelry. Freeze protect tubing with 35 bbls MeOH. Trap 500 psi on well. Continued with CTD sidetrack operations. RECEIVED [,auv 0 9 2000 Ala~a 0il & Gas Cons. Commission Anc~ge BP EXPLORATION Page 1 of 8 Operation's Summary Report · Legal Well Name: 15-34 Common Well Name: 15-34 Spud Date: 4/28/1994 Event Name: REENTER+COMPLETE Start: 9/17/2000 End: 9/28/2000 Contractor Name: NORDIC CALISTA Rig Release: 9/29/2000 Group: COIL Rig Name: NORDIC I Rig Number: · Date From,To HoUrs! Task Sub Phase ' Description of Operations ~: ~ Code : · 9/18/2000 15:30 - 17:00 1.50 MOB PROD1 Rig off standby at 15:30 hrs. Move over to well 15-34a. Back rig over well and set down same. ACCEPT RIG ON DS15-34A AT 17:00 HRS ON 09/18/2000. 17:00 - 20:50 3.83 RIGU PROD1 Set cuttings tank. Rig up floor. Prepare to test BOPE. Waiting on AOGCC Rep to start BOP test. 20:50 - 23:30 2.67 RIGU PROD1 Started BOP test. Test witnessed by AOGCC Rep J. Jones. 23:30 - 00:00 0.50 BOPSUF PROD1 Continue testing BOP's. 9/19/2000 00:00 - 02:00 2.00 BOPSUR PROD1 Finish BOP test. Tested @300/3500 psi. OK 02:00- 04:00 2.00 RIGU PROD1 Testing coil. OK. 05:00 - 06:45 1.75 STWHIP PROD1 RIH. Pumping at minimum rate 0.6BPM @330 psi. Tag 4 1/2" XN nipple at 10403' and correct to ELMD of 10397' (-6'). 06:45 - 07:00 0.25 STWHIP PROD1 Mill thru XN nipple profile 2.5 bpm 1400 psi. 07:00 - 07:15 0.25 STWHIP PROD1 RIH. Tag pinch point on whipstock face and correct depth to 10851' c: (+0.5'). .~ 07:15 - 11:00 3.75 STWHIP PROD1 Start milling window at 10851' Got some gas up from btms up and divert returns thru buster. Pump 15 bbl visc sweep at 08:45 hrs with 3' EE of window milled. Take returns back thru MM.  ,~ 11:00 - 11:45 0.75 STWHIP PROD1 Got a stall - probably at bottom of window. Dress off bottom of window. i Bottom of window at 10857.2'. Start milling formation. 0% 1:45 - 12:30 0.75 STWHIP PROD1 Pump 20 bbl viscosified sweep. Mill formation to 10867' O 2200 psi @ 2.5 bpm. _~ 1,52:30 15:00 2.50 STWHIP PROD1 Work string mill across window to clean up burrs and rough edges. --- '~,=15:00 16:00 1.00 STWHIP PROD1 Switch to FIo-Pro for mud displacement. ~ ~ 16:00 - 18:00 2.00 STWHIP PROD1 Displace mud into annulus and POH for drilling assembly. Flag pipe at 10700' EOP. -~ 18:00 - 18:30 0.50 S'I'WHIP PROD1 LD milling BHA. :;~ 18:30 - 19:15 0.75 DRILL PROD1 M/U MWD BI-IA #2 with 2.57 deg short rad motor and M09 Bit #1 19:15 - 21:15 2.00 DRILL PROD1 RIH with drilling BHA. Shallow test Sperry tools. Cont. RIH. 21:15- 22:00 0.75 DRILL PROD1 Pre-Spud meeting with all personnel. Review well plan. 22:00 - 22:30 0.50 DRILL PROD1 Orient TF to 90R. 22:30 - 00:00 1.50 DRILL PROD1 Drill build / turn interval at 90R TF to 10,895 ft. 30 FPH, 9/20/2000 00:00 - 01:30 1.50 DRILL PROD1 Drilled to 10928 fi, 75R TF, 01:30 - 02:30 1.00 DRILL PROD1 Drilled to 10942 ft, 90R TF. 02:30 - 04:20 1.83 DRILL PROD1 Orient TF to 80R. Unable to orient on bottom. Pull to window and orient. RIH. Orientor rolled 90 deg. Pull to window, Orient. RIH. 04:20 - 04:40 0.33 DRILL PROD1 Drilling, 80R, 2.5 BPM, 3200 psi, TF rolling to right. 04:40 - 06:00 1.33 DRILL PROD1 Pull to window and orient. RIH. TF wrong. 06:00 - 06:30 0.50 DRILL PROD1 Drilling. Started losing returns at 10970' +/- 0.5 bpm. 06:30 - 07:45 1.25 DRILL PROD1 Cont drilling - losses increased to 1 bpm but slowly came down to 0.3-0.5 bpm. 2.4/2.2 bpm @ 3450 psi. TF 45L. ROP 70 fph. 07:45 - 09:30 1.75 DRILL PROD1 Continue drilling ahead monitoring mud losses - increased up to 0.7 bpm at 11017' and ROP decr to 14 fph. 09:30 o 10:15 0.75 DRILL PROD1 Cont drilling - 2.5/1.6 bpm 3700 psi. 58R. ROP -- 10 fph. Received 250 bbl new FIo-Pro. 10:15 - 10:30 0.25 DRILL PROD1 Circ pressures increasing to 4000 psi on bottom drilling and losses still at about 1 bpm. Wiper trip to window - circ pressures not coming down and hole looks clean. 10:30 - 11:15 0.75 DRILL PROD1 Cont drilling ahead - 2.5/1.5 bpm. 3850 psi. 53R. ROP = 12 fph. MI mixing 400 bbl Aphron system at plant. 11:15 - 11:45 0.50 DRILL PROD1 Pull up to window and get 2 clicks - not getting response.Try I more click - OK 11:45 - 12:15 0.50 DRILL PROD1 Drill to 11055'. 2.5/1.3 bpm. 3750 psi. 42R. Printed: 11/312000 2:14:53 PM Memory Multi-Finger Caliper Log Results Summary Company: BP Exploration (Alaska) Inc. Log Date: September 13, 2000 Log No.: 4156 Run No.: 1 Pipe Desc.: 4.5" 12.6 lb. L-80 Pipe Use: Tubing Well: DS 15-34 Field: Prudhoe Bay State: Alaska APl No.' 50-029-22474-00 Top Log Intvl' Surface Bot. Log Intvl: 10,418 Ft. (MD) Inspection Type' Side-Track Candidate Inspection ORIGINAL COMMENTS ' This survey was run to assess the condition of the tubing with respect to corrosive and mechanical damages. The caliper recordings indicate that the tubing ranges from good to fair with respect to corrosive wall penetration. Most of the tubing appears in good condition, with recorded penetrations falling below 20% wall thickness and no recorded cross-sectional wall loss in excess of 8%. Penetrations ranging from 21% to 39% wall thickness are recorded in 44 joints between 3,100 ft. and 8,500 ft. Most of the damage appears in the form of line corrosion, with the deeper recorded penetrations appearing as isolated pitting. The distribution of corrosive penetrations recorded throughout the tubing string are illustrated in the Body Damage Profile sheet of this report, and cross-sectional drawings of the pipe at the location of the deepest recorded penetrations are also included. MAXIMUM RECORDED WALL PENETRATIONS ' Line of Pits (39%) Jt. 151 @ 6,393' MD Line of Pits (35%) Jt. 150 @ 6,363' MD Line of Pits (32%) Jt. 200 @ 8,424' MD Line Corrosion (32%) Jr. 114 @ 4,843' MD Line Corrosion (31%) Jt. 147 @ 6,245' MD MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS · No areas of significant cross-sectional wall-loss (in excess of 8%) are recorded throughout the interval logged. MAXIMUM RECORDED ID RESTRICTIONS ' No significant ID restrictions, in excess of 0.07", are recorded throughout the interval Iogged:~../'" Field Engineer' J. Burton Analyst: J. Burton '~, ,; t' f,~: Witness: Dave Romberg I D. oa ti,,=, '.~g~ c i~ ........... inc. / O. Box StafFord. ~IX 77.;197 Phone' x-~,~2olx ~ or (888) :~6~,-~Oao~ = ~ '~ ~"' (28i) ~'= ~-,~o , . , a~. aoa-~..~':~E-mai! PDS¢)n-~emorylrxz~.com_~ ~ Prudhoe Bay ,~ld Office Phone: (907) 0:-,~-2~07 Fax (907) GSO-23!d. Well: DS 15-34 Field: Prudhoe Bay Company: BP Exploration Alaska, Inc. Country: LISA PDS Caliper Overview Body Region Analysis Survey Date: Sept. t3, 2000 Tool Type: MFC40 No. 99493 Tool Size; 2.75" No. of Fingers: 40 AnalYsed: loev Burton Tubing: Size Weight Grade & Thread Norn. OD NomJD Nom. Upset 4.5 ins 12,6 ppf L-80 4.5 ins 3.958 ins 4.5 ins Penetration and Metal Loss (% wall) ~: penetration body ;,? metal ~oss body t00 1% 10% 20% 40% 85% 85% _Numbe~ of pints ~nalvsed (totai Pene 0 25 194 44 0 0 Loss 20 243 0 0 0 0 Damage ConfiguratSon ( body ) 200 ~ Numberofioin~ damaged(total= 213) 24 0 189 0 0 Damage Profile (% wa~l) penetratbn body ~,~,:~ ~etal loss body 0 50 GLM I 88 138 GLM 2 185 GLM 3 232 GLM 4 BoSom ofSurvey = 245 100 Analysis Ovelview page 2 PDS )ER JOINT TABULATION Pipe: 4.5 ins 12.6 ppf U80 Wall thickness, Body: 0,271ins Upset = 0,271ins Nominal ID: 3,958 ins Field: Company: Country: Date: DS 15-34 Prudhoe Bay BP Exploration Alaska, Inc. USA Sept 13, 2000 Penetration Metal [ Pro ection Upset Body Loss Upset [Body inches inches [ % % inches [inches ID iI~ches 3.91 4 0 3.91 3.92 3.91 0 I 394 3.93 0 ] 3.93 3.91 3.90 3.91 3.92 3.90 3.91 3,90 3.90 PUP PUP PUP PUP PUP PUP Line shallow corrosion. PUP Line shallow corrosion. Line shallow corrosion. 3.92 3.90 Line shaflow coHosion. .04[ 3.92 3.92 ,04i 3.91 3 86 Line shallow corrosion. 3.91 Line shallow corrosion. 3.91 Line shallow corrosion. 04! 391 Line si~aliow corrosion, 3.92 Line shallow corrosion. 3.92 3.89 Line shallow corrosion. 3.91 Line shaflow corrosion. 3.91 Line shallow conosion. 3.91 Line shallow corrosion. 3.92 3.89 Line shallow corrosion 3.92 3,92 3.92 3.92 Line shallow corrosion. 3.92 Line shallow corrosion 3.91 Line shallow corrosion. 3.90 Line shallow corrodon. 3.92 3.92 L~ne shallow corrosion. 3.92 3.92 Line shallow corrosion. 3.92 Line si~aJlow corrosion. 3.91 Line shallow corrosion. 3.92 Line shallow corrosion. 3.93 IJne shallow corrosion. 3.92 Line shallow corrosion. penetration body metal loss body Damage profile % wa ) 50 100 Pipe Tabulations page PDS CAi JOINT TABULATION Pipe: 4.5 ins 12,6 ppf L-80 Walt thickness. 8od¥: 0.27 l ins Upset = 0.27lins Nominal ID: 3.958 ins Penetration Upset Body inches inch 0 Well: Field: Company: Cotlntl¥: Date: DS 15-34 Prudhoe Bay BP Exploration Alaska, Inc. USA Sept. 13, 2000 inches ! inches 3,92 3.91 3.9t 3.92 3.92 3.91 3.94 3.92 3.93 3.93 3.92 3.92 3.90 3,92 3.92 3.92 3.93 .041 3.92 3.92 3.92 ine shallow corrosion. Line shallow corrosion, Line shallow corrosion. Lille shallow corrosion, Line shat]ow con'osion. Line shallo~v corrosion. PUP Line shallow corrosion. sssv ~ PUP Line shallow corrosion. Line shallow corrosion. Line shallow corrosion. Line shallow corrosion, Line shallow corrosion, Line shallow corroston, Line shallow corrosion Line shallow corrosion. Line shallow corroston. Line shallow corrosion. Shalt~ pitting. 3.91 Line shallow corrosion. 3.92 Line shallow corrosion. 3.93 Line shallow corrosion. 3.94 (Line shallow corroslol~~ 3.92 ~ Line shallow corrosion, 3.93 [ Line shallow corrosion 3.9/ ~ Line shallow corrosion. 3.92 3.90 ~ L~e sl~ow corrosion. 3.93 J Shallow pi~ing. 3.92 Shallow pitting:. 3.92 Shallow pitting. _ 3.92 Line corrosion~ 3.9I Line shallow corrosion. 3.91 Line corrosion. 3.92 PUP Line shallow corrosion. 3~94 GLM t (Latch @ 3:00) 394 PUP Line shallow corrosion. 3.93 Line shallow corrosion. 3.93 Shallow pi_lting, 3.92 Shallow pittmfi. 3.89 Line shallow corrosion. 3.93 Shallgw pitting. ~ 3.94 Line shallow corrosion. 3.94 3.91 ]Shallow pittinF~ ...... 3.93 / Line shallow corrosion. 3.93 ] Line shallow corrosioll_ . 392 ~ Line shallow conosion, 1 Damage profile (% wall) 50 I O0 Pipe Tabulations page 2 PDS CAi JOINT TABULATION Pipe: 4.5 ins 12.6 pp[ L-80 Wall thickness. Body: 0.27fins Upset = 0.271ins Nominal ID: 3.~8 ms Penetration P~ojection Body Body inches Well: Field: Company: Country: Date: DS 15-34 Prudhoe Bay BP Exploration Alaska USA Sept. 13, 2000 Inc. ~zff;~ penetration body ::,,? metal loss body Minimum ID Comments inches 3.93 Line shallow colrosion. 3.93 Line shallow corrosion. 3.93 [[ne shallow corrosion. 3,93 Line shallow corrosion. 3.93 Line shallow corrosion. 3.93 _ine shallow corrosion. 3.93 Shallow pitting. 3,92 Line shallow corrosion. 3.94 Line corrosion. .041 3.91 Line corrosion. 3.94 Line shallow con'osion. 3.93 3.93 ~Lq.e_ shallow corrosion. 3.95 ILine shallow conosion. 3.92 [Line shallow corrosion. 3.94 Shallow pitiing. 3.93 3.93 Line shallow corrosion. 3.93 Line shallow corrosion. 3.93 Line shallow corrosion. 3.92 Line shallow corrosion. 3.94 Line shallow corrosion. 3.92 Line corrosion. 3,95 Line shallow corrosion. 3.92 Shallow pitting. 3.93 Line corrosion. 3.90 Line corrosion. 3.92 Line corrosion. 3.94 Line shallow corrosion. 3~94 Line cofrosion. 3.93 Line shallow corrosion. 3.93 Line corrosion. 3.92 Line shallow corrosion. 3.93 Line shallow corrosion. 3.93 Line shallow corrosion. 3.92 Line corrosion. 3.94 ' Line shallow corrosion. 3,94 Line corrosion. 3.93 Line shallow colrosion. 3.93 ]Shallow pitting. 3.94 ~ shallow~_~' corrosion_, 3.94 ILin~ shallow corrosion. 3.93 IShatl°w pitfinfi~ 3,93 Line corrosion. 3.92 I~(~ated pitting, 3.93 _[ Line corrosion. 3.93 iLine corrosion. 3.93 ~ Line corrosion. 3.92 ,Line shallow corrosion. Pipe Tabulations page 3 1 Damage profile wall) 50 100 PDS JOINT TABULATION Pipe: 4,5 ins 12.6 ppf L-80 Walt thickness. Body: 0.271 ins Upset = 0.27 l ins Nominal ID: 3.958 ins Body 0 ] Well: Eietd: Company: Country; Date: DS 15-34 Prudhoe Bay BP Exploration Alaska, Inc. USA Sept. 13, 2000 Minimum ID inches 3.93 3.95 3.93 3.94 Line shallow corrosion, Line corrosion. Isolated pitiing. 3,92 Line corrosion. 3.92 Line shallow corrosion, 3.94 Line corrosion. 3 PUP Shallow pitting. 3.94 GLM 2 (Latch @ 12:00) 3,94 PUP Line shallow corrosion. 3.93 Line shallow corrosion. 3.93 3.92 Shallow pitting. Line corrosion. 3.94 Line shallow corrosion. 3.94 Line corrosion. 3.94 3.92 3.93 3.94 3.94 3.94 Line of pits. Line of pits. Line corrosion. Line of pits. Line shallow corrosion. Line shallow corrosion. g'~ Line shallow co~rosion~ 3.92 ]Line corrosion. 3.95 ~: . 3.923'91 ~_~.~corrosion. 3.94 /Shall°w pi~?ng, 3.95 [Line corrosion, 3.94 Isolated pitting. 3.93 ILine shallow corrosion~ 3.94 ~yr!!)sion. 3.93 ]Line s~ha!bw corros!on. 3.93 iLine ~allow corrosig~L 3.93 ~allow corrosion. 3.92 Line 3.93 corrosion. 3.93 3.94 3.93 Line corrosion, 3.94 Line corrosion. 3.93 Isolated pitting. 3.94 Line shallow corrosion. 3.92 Line corrosion~ 3.93 Line corrosion. 3.93 Line shallow corrosion. , 3,95 Line corrosion. 3.94 ~ Shallow pitting. _ 3~94 Line shallow corrosion. 3.94 Line shaffow corrosion. 3.94 ILine shallow corrosion. penetration body metal loss body Damage profile % waft 50 I O0 Pipe Tabulations page 4 PDS JOINT TABULATION Pipe: 4.5 ins 12.6 ppf b80 Wall thickness. Body: 0.27tins Upset = 0.27lins Nominal ID: 3,958 ins Well: Field: CompanY: Country: Date: DS 15~34 PrL~clhoe Bay BP Exploration Alaska, Inc, USA Sept, 13, 2000 joint NO 0 Minimum ht~cDh es Comments 3,95 Line shallo,,~., corrosion. 3.92 IShallow pitting. 3.95 [Line shallow corrosion. 3.94 [ 3.923.92Line shallow corrosion. 3.9t 3.93 3.93 3,93 Line shallow corrosion. 3.93 Line shallow corrosion. 3.93 PUP 3.92 GI.:...M- 4 (Latch @ 7:30) 3.92 PUP 3.93 3.92 3.93 X-NIPPLE Assr. 3.93 PACKER 3.93 PUP 3.92 PUP 0 X-N IPPLE Assr. 0 XN-NtPPLE Assy. 0 WLEG 0 LINER Dama§e Classifications Penetration / proiection class, in order o[ damage severib Hole - penetration exceeds 85% of nominal wall thickness Ring - damage area exceeds 75% of circumference, but depth range does not exceed I * pipe tD Line ~ damage depth range exceeds 5 ~ pipe ID, but extends tess lhan 20% ot circumference General - damage depth range exceeds 1 * pipe ID and/or extends more than 20% ot circumierence Isolated - damage depth range does not exceed 5 ~ pipe ID or extend more than 20'~ of circumference Damage ~eporting [tweshold = 30 thou inches deviation in body, 50 thou in upset. Modal line length = 0,243 feet. Damage profile % wal 50 100 Pipe Tabulations page 6 PDS CA R JOINT TABULATION SHI Pipe: 4.5 ms 12.6 ppf 1-80 Well: DS /5-34 Wall thickness. Body: 0.271ins Upset =0.271ins Field: Pmdhoe Bay Nominal ID: 3.958 ins Company: BP Exploration Alaska, Inc. Country: USA Date: Sept, 13, 2000 ~<z~ pe etrat on body 7~etal loss body No Upset Body Loss IUpset Body I ID Comments inches roches I % % inches inches[ inches t85 0 .06 [ 22 5 0 ] 0 [ 3,95 Line corrosion. 186 0 .03 I t2 6 0 0 ' 3,95 Line shallow corrosion. /87 0 I .07 2~ 7 0 0 3.95 Line corrosion. 188 0 I ,05 t8 5 0 ' 0 3.93 ! Line shallow corrosion. t~9 I 0 ! .04 I 5 0 I 0 3.95 Line shallow corrosion. m90 0 .04 14 6 0I 0 3.94 Line shallow corrosion. 191 0 .03 i / 5 0 0 3.94 Line shallow corrosion. [92 0 _ .07 25 6 0 0 3.95 Line conos~on, 193 0 [ .03 lC 3 0 0 3.94 194 I 0 ] .03! /3[ 6 0 0 3.95 Line shallow corrosion, 195 0 ,04 13 6 0 0 3.95 I Line shallow corrosion. 196 0 .05 17 6 0 0 3.95 Line shallow corrosion. 197 0 .04 14 8 0 0 _ 3.94 Line shallow corrosion. 198 I 0 I .03 i3 5 0 0 3~94 Line shallow corrosion. ~9I 0 i .04 /4 7 0 0 3.95 Line shallow corrosion. 200 I 0 .09 32 6 0 0 3.94 Line of pi~s. 20t I 0 .03 12 4 0 0 3.93 Line shallow corrosion. 202I 0 .04 15 7 0 0 3.94 Line shallow corrosion. 2(3_3 0 .04 t4 5 0 0 3.95 Line shallow corrosion. ' 203, I 0 .03 [ 2 3 0 0 3.94 PUP Line shallow corrosion. 203.2 0 0 0 0 ! 0 0 3.94 GLM 3 (Latch @ 2:00) 203.3 0 ,03 ! ! 3 0 0 3,94 PUP 204 0 .03 i2 4 0 ~ 3.94 Line shallow corrosion. 2__.¢5 0 .04 14 6 00 I 3.95 me shallow corrosion, 206 0 .03 12 7 0 0 3.95 ine shallow corrosioa. 207 Oj .03 13 4 0 0 3.94 Line shallow corrosion. 208 0 ,0~3~ 13 4 0 0 3.94 Line shallow corrosion. 209 0 .03 I3 6 0 0 3.94 Line sba~iow corrosion, ! 210 0 .03 l 3 6 0 i 0 3.9~ Line shallow corrosion. ~21t 0 _ .03 c 4 0 0 3.95 2~12 0 .03 1 4 0 0 3.94 Line shallow corrosion. 2 t 3 0 / .04 14 4 0 0 3.92 ' Line shallow corrosion~ 214 0 - .04 15 6 0 0 3.94 Line shallow corrosion, 1215 0! .03 1~ 4-- 0 0 3.93 [ 2 I6 0 / .03 12 4 0 0 3.93 Line shailow corrosion. ~t~---! .03 12 3 0 0 3.93 Line shallow corrosion. .04 t( 6 0 - 0 3.95 Line si~a[tow corrosion. 219 ! ) ] ,04 f~-I 5 O_ 0 3.93 Line shallow corrosion. 220i_~00 .04 13 4 0 0 3,94 ! Line shallow corrosion. 221 .04 ~4 7 0 0 3.94 Line shallow corrosion. 222 .0~4_ 13 4 0 0 3.9_3 Line shallow corrosion, 223 i .03 12 4 0 0 _[ 3,94 Line shallow corrosion, ~ 0 .03 13 6 0 0 3.94 Line shallow corrosion. 225 ! 0 .03 1/ 4 0 0 3.95 226 0 .03 12 4 0 0 3.94 Line shallow corrosion. 227 0 .03 13 4 0 .03 3.92 Shallow pitting, _ _2.28 0 .04 14. 7 0 0 _ 3.93 Line shallow corrosion. 2~9 0 .04 1~[ 6 0 0 3.94 Line shallow corrosion. 230 0 ,03 t ! 3 0 0 3.93 23_1~_1 .04 ~ 6 0 0 3.94 Line shallow corrosion, Pipe Tabulations page 5 Well: DS 15*34 Field: Pmdl~oe Bay Company: BP Exploration Alaska, CouRtly: USA Tubins: 4.5 ins 12.6 ppf L~80 PDS Caliper Sections Survey Date: Sept. 13, 2000 Tool Type: MI:C40 No. 99493 Tool Size: 2.75" No. o{ Fingers: 40 Analy~ed: Joey Burton Cross section for Joint 151 1ool speeJ = 6a Nominal ID = 3.958 Nominal OD = 4.500 Remaining wall area = 97 % Tool deviation = 51 ° at depth 6392.95 ft Finger 21 Penetratiorl = 0.105 ins Line of Pits 0.10 in. = 39% HIGH SIDE = UP Cross*Sections page 1 PDS Caliper Sections Well: DS 15-34 Field: Prudhoe Bay Company: BP Exploratioe Alaska, Inc, Country: USA Tubir 4.5 ins 12.6 b80 Survey Date: Sept. 13, 2000 Tool Type: MFC40 No. 99493 Tool Size: 2.75" No. of Fingers: 40 Analysed: Joey Burton Cross section for Joint 150 at depth 6363.25 ft Too[ speed = 64 Nominal ID = 3.958 Nominal OD = 4.500 Remaining wall area = 97 % Tool deviation = 50 ° Finge~ 21 Penetralion = 0.094 ins Line of Pits 0.09 in, = 35% HIGH SIDE = UP Cross-Sections page 2 PDS Caliper Sections Well: DS 15-34 Fietd: Prudhoe Bay Company: BP Exploration Alaska, Inc. Country: USA Tubing: __ 4.5 ins 12.6 ppf L-80 Sm',,ey Date: Sept. 13, 2000 Tool Type: MFC40 No. 99493 Tool Size: 2.75" No. of Fingers: 40 A~alysed: ~qey B.t!rton Cross section for Joint 200 at depth 8424.32 ft Tool speed = 64 Nominal ID = 3.958 Nomii~al OD = 4.500 Remaining wall area = 94 % Tool deviation - 49 ° Finger 25 Penebation = 0.088 ins Line of Pits 0.09 in, = 32% HIGH SIDE = UP Closs-Sectiolls page 3 PDS ,LIPER JOINT TALLY SHEET Pipe: 4.5 ins 12.6 ppf L-80 Wall thickness. Body: 0.271 ins Upset = 0.271 ins Nominal ID: 3.958 ins Joint ~ Depth Length Measured [Type No. ID feet feet inches .1 22.97 3.18 nominal Pup 1 26.15 41.19 nominal 1.1 67.34 2.49 nominal Pup 1.2 69.83 2.84I nominal Pup 1.3 72.67 4.37 [ nominal Pup 1.4 77.04 5.85 ] nominal Pup 1.5 82.89 9.64i nominal Pup 1.6 92.53 10.36 ' nominal Pup 2 102.89 41.24 nominal 3 144.13 41.53 nominal 4 185.66 41.51 nominal 5 227.1 7 42.00 nominal 6 269.17 41.30 nominal 7 310.47 41.78 nominal 8 352.25 41.50 nominal 9 393.75 4t .19 nominal 10 434.94 41.65 nominal 11 476.59 41.78 nominal 12 518.37 41.58 nominal 13 559.95 41.43 nominal 14 601.38 I 41.28 nominal 15 642.66 42.29 nominal 16 684.95 41.06 nominal 1 7 726.01 40.96 nominal 18 766.97 42.12 nominal 19 809.09 41.48 nominal 20 850.57 41.40 nominal 21 891.97 41.43 nominal 22 933.40 41.53 nominal 23 974.93 41.08 nominal 24 1016.01 41.14 nominal 25 1057.15 42.22~ nominal I 26 1099.3 7 41.77 nominal 27 1 t41.14 40.90 nominal 28 1182.04 41.45I nominal 29 1223.49 41.53 [ nominal 30 1265.02 41.24I nominal 31 1306.26 41.57 nominal 32 1347.83 41.65 I nominal I 33 1389.48 41.44[ nominal 34 1430.92 41.47 nominal 35 1472.39 I 41.99 nominal 36 1514.38 41.11 nominal 37 1555.49 41.79 nominal 38 1597.28 41.22 nominal 39 1638.50 41.83 nominal 40 1680.33 41.56 nominal 41 [ 1721.89 41.25 I nominal 42 1763.I4 4t.60I nominal 4a" 1804.74 41.78 t nominal Well: DS 15-34 Field: Prudhoe Bay Company: BP Exploration Alaska, Inc. Country: USA Date: Sept. 13, 2000 Joint Depth Length Measured Type I No. iD feet feet inches 44 1846.52 41.30 nominal 45 1887.82 41.44 nominal 46 1929.26 41.21 nominal 47 1970.47 41.88 nominal 48 2012.35 41.48 nominal 49 2053.83 41.50 nominal 50 2095.33 41.53 nominal 51 2136.86 41.61 nominal 51.1 21 78.47 9.84 nominal Pup 51.2 2188.31 18.62 nominal SSSV 51.3 2206.93 9.44 nominal Pup 52 2216.37 41.69 nominal 53 2258.06 41.58 nominal 54 2299.64 41.83 nominal 55 2341.47 41.29 nominal 56 2382.76 41.1 9 nominal 57 2423.95 41.50 nominal 58 2465.45 41.54 nominal 59 2506.99 41.45 nominal 60 2548.44 41.55 nominal 61 2589.99 41.24 nominal 62 2631.23 41.74 nominal 63 2672.97 40.21 nonninal 64 2713.18 42.25 norninal 65 2755.43 41.76 nominal 66 2797.19 41.50 nominal 67 2838.69 41.54 nominal 68 2880.23 41.54 nominal 69 2921.77 41.45 nominal 70 2963.22 41.1 6 nominal 71 3004.38 41.31 nominal 72 3045.69 41.52 nominal 73 3087.21 41.19 nominal 74 3128.40 41.82 nominal 75 31 70.22 41.25 nominal 76 3211.47 41.3 7 nominal 76.1 3252.84 9.69 nominal Pup 76.2 3262.53 7.31 nominal GLM1 76.3 3269.84 9.77 nominal Pup 77 3279.61 41.45 nominal 78 3321.06 41.44 nominal 79 3362.50 41.96 nominal 80 3404.46 41.77 nominal 81 3446.23 40.73 nominal 82 3486.96 41.89 nominal 83 3528.85 40.42 nominal 84 3569.2 7 42.26 nominal 85 3611.53 41.70 nominal 86 3653.23 41.82 nominal 87 3695.05 41.25 nominal Joint Tally page 1 PDS LIPER JOINT TALLY SHEET Pipe: 4.5 ins 12.6 ppf L-80 Wall thickness. Body: 0.271 ins Upset = 0.27! ins Nominal ID: 3.958 ins Joint! Depth Length Measured Type No. ID feet feet inches 88 3736.30 41.80 nominal 89 3778.10 40.75 nominal 90 3818.85 41.96 nominal 91 3860.81 41.92 nominal 92 3902.73 41.25 nominal 93 3943.98 41.85 nominal 94 3985.83 41.04 nominal ,., 95 4026.87 41.72 nominal 96 4068.59 41.51 nominal 97 4110.10 41.17 ] nominal 98 4151.27 41.88 I nominal 99 4193.15 41.46 norninal 100 4234.61 41.03 nominal 101 42 75.64 41.42 nominal 102 4317.06 41.31 nominal 103 4358.37 41.89 nominal 104 4400.26 40.58 nominal 105 4440.84 42.70 nominal 106 4483.54 41.25 nominal 107 4524.79 41.52 nominal 108 4566.31 41.27 nominal I 109 4607.58 41.41 nominal 110 4648.99 41.31 nominal 111 4690.30 41.63 nominal 112 4731.93 41.92 nominal 113 4773.85 40.90 norninal 114 4814.75 41.90 nominal 115 4856.65 41.72 ' nominal 116 4898.37 41.75 nominal 11 7 4940.12 41.82 nominal 118 4981.94 41.24 nominal 119 5023.18 41.13 [ nominal 120 5064.31 41.82[ nominal 121 5106.13 41.72[ nominal 122 5147.85 41.70[ nominal 123 5189.55 41.39 nominal 124 5230.94 40.93 nominal 125 52 71.87 42.28 nominal 126 5314.15 40.71 I~ nominal 127 5354.86 42.11t nominal 128 5396.97 40.96 nominal 129 5437.93 41.32 nominal I 130 5479.25 41.09 nominal 131 5520.34 41.90 nominal 132 5562.24 41.54 nominal 133 5603.78 38.33 nominal 134 5642.11 40.99 nominal 135 5683.10 41.54 nominal I 136 5724.64 41.83 nominal 137 5766.47 42.17 I nominal Well: DS ! 5-34 Field: Prudhoe Bay Company: BP Exploration Alaska, Inc. Country: USA Date: Sept. 13, 2000 Joint Depth Length Measured Type No. ID feet feet inches 138 5808.64 40.96 nominal 139 5849.60 41.95 norninal 140 5891.55 40.63 nominal 141 5932.18 41.98 nominal 142 5974.16 41.21 nominal 143 6015.37 42.44 nominal 144 6057.81 40.47 nominal 144.1 6098.28 9.52 nominal Pup 144.2 6107.80 7.74 nominal GLM2 144.3 6115.54 9.71 nominal Pup 145 6125.25 41.63 nominal 146 6166.88 41.22 nominal 147 6208.10 41.43 nominal 148 6249.53 41.80 nominal 149 6291.33 41.56 nominal 150 6332.89 40.73 norninal 151 63 73.62 41.63 nominal 152 6415.25 42.44 nominal 153 6457.69 40.95 nominal 154 6498.64 41.13 nominal 155 6539.77 41.10 nominal 156 6580.87 42.15 nominal .. 157 6623.02 4t .75 nominal 158 6664.77 40.97 nominal 159 6705.74 42.15 nominal 160 6747.89 41.15 nominal 161 6789.04 41.09 nominal 162 6830.13 41.61 nominal 163 6871.74 41.61 nominal 164 6913.35 41.1 6 nominal 165 6954.51 41.51 nominal 166 6996.02 41.74 nominal 167 7037.76 41.29 nominal 1 68 7079.05 41.94 nominal 169 7120.99 41.34 nominal 1 70 7162.33 41.61 nominal 1 71 7203.94 41.48 nominal 1 72 7245.42 42.00 nominal 1 73 7287.42 40.78 nominal 1 74 7328.20 40.98 nominal 175 7369.18 42.34 nominal 1 76 7411.52 41.38 nominal 1 77 7452.90 41.1 9 nominal 1 78 7494.09 41.50 nonninal 1 79 7535.59 42.00 nominal 180 7577.59 41.01 nominal 181 7618.60 41.1 7 nominal 182 7659.77 41.99 nominal 183 7701.76 41.96 nominal 184 7743.72 40.90 nominal Joint Tally page 2 PDS : LIPER JOINT TALLY SHEET Pipe: 4.5 ins 12.6 ppf L-80 Wall thickness. Body: 0.27i ins Nominal ID: 3.958 ins Upset = 0.271 ins I Joint No. 185 186 187 189 190 191 /192 1194 '195 196 -- 197 198 199 2O0 201 202 Depth feet 7784.62 7825.70 Length feet 41.08 42.40 7868.10 41.47 7909.57 41.54 795i .1 i 7992.67 8033.74 4i .56 41.07 41.36 Measured ID inches nominal nominal nominal nominal nominal nominal nominal Type 8075.10 41.47 nominal 8116.57 41.41 nominal 8157.98 41.80 nominal 8199.78 41.43 nominal 8241.21 41.52 nominal [ 8282.73 42.26 nominal 8324.99 41.86 nominal 8366.85 40.43 nominal 8407.28 42.30 nominal 8449.58 40.64 nominal 8490.22 42.05 nominal 8532.27 41.1 9 nominal 8573.46 9.33 norninal} Pup 8582.79 8.21 nominal t GLM3 8591.00 9.25 nominal I Fup 8600.25 41.84 nominal 8642.09 41.40 nominal 8683.49 41.06 no~.-ninal 8724.55 41.65 nominal 8766.20 41.23 nominal 8807.43 41.63 nominal 8849.06 41.79 nominal 8890.85 42.14 nominal 8932.99 40.31 nominal 8973.30 42.11 nominal 9015.41 41.59 nominal 9057.00 40.70 nominal 9097.70 41.88 nominal i 9139.58 40.53 nominal 9180.11 42.28 nominal 41.55 nominal 40.60 nominal 9222.39 9263.94 9304.54 9346.60 9386.50 9427.12 9469.46 42.06 39.90 40.62 42.34 nominal nominal nominal nominal nominal nominal nominal nominal 41.34 9510.80 41.1 7 9551.97 40.60 9592.57 42.69 9635.26 41.30 nominal 9676.56 41.14 nominal 971 7.70 41.47 nominal Well: DS 15-34 Field: Prudhoe Bay Company: BP Exploration Alaska, Inc. Country: USA Date: Sept. 13, 2000 JointI Depth i Length Measured Type No. iD feet feet inches 232 9759.1 7 41.49 nominal 233 9800.66 41.38 nominal 234 9842.04 41.70 nominal 235 9883.74 40.37 nominal 236 9924.1 '1 41.75 nominal 237 9965.86 41.81 nominal 238 10007.67 41.56 nominal 239 10049.23 40.00 nominal 240 10089.23 42.45 nominal 241 10131.68 40.79 nominal 242 101 72.47 41.50 nominal 242.1 10213.97 8.22 nominal Pup 242.2 10222.19 7.51 nominal GLM4 242.3 10229.70 10.32 nominal Pup i243 10240.02 42.15 nominal 244 10282.1 7 40.63 nominal 244.1 10322.80 20.81 nominal X-NIP 244.2 10343.61 14.96 nominal PKR 244.3 10358.57 10.18 nominal Pup 244.4 10368.75 10.23 nominal Pup 244.5 10378.98 20.97 nominal X-NIP 244.6 10399.95 13.37 nominal XN-NIP 244.7 104t3.32 5.29 nominal WLEG 245 10418.61 unknown nominal LIN ER ', Joint Tally page 3 " , , To: Blair Wondzell Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Ted Stagg CTD Engineer Date: Sept. 11,2000 Re: Well 15-34a Well 15-34 is scheduled for a through tubing sidetrack with the Schl./Nordic coil drilling rig. The sidetrack, 15- 34a, will kick off from a window milled from a mechanical whipstock to be set in Zone 2. The 15-34a target is lower Zone 2. The following describes work planned to prep 15-34 for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack completion is attached for reference. 1. The tubing tailpipe will be plugged and both tubing and inner annulus will be pressure tested. 2. A dummy whipstock drift will be run on slickline. 3. A PDS calliper will be run to verify tubing condition. 4. E-Line will set a mechanical whipstock at approx. 10,850' MD in the 5 Y2" liner. 5. Service coil will pump approx. 20 bbls cement to shut off existing perfs below the whipstock. E-line is scheduled to set the whipstock on Sept. 14. Service coil will carry out step 6 on Sept. 15-16, 2000 pending approval of the Sundry Notice. Ted Stagg CTD Drilling Engineer CC: Well File Petrotechnical Data Center -_. STATE OF ALASKA .... ALASK L AND GAS CONSERVATION COIV AI-'PLICATION FOR SUNDRY APPROVAL DION 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1428' SNL, 945' EWL, SEC. 22, T11N, R14E, UM At top of productive interval 485' NSL, 1189' EWL, SEC. 14, T11N, R14E, UM At effective depth 518' NSL, 1417' EWL, SEC. 14, T11N, R14E, UM At total depth 521' NSL, 1445' EWL, SEC. 14, T11N, R14E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service ORIGI AL 6. Datum Elevation (DF or KB) KBE = 65.45' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 15-34 9. Permit Number 194-063 10. APl Number 50- 029-22474-00 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11310 feet true vertical 9035 feet Effective depth: measured 11232 feet true vertical 8962 feet Casing Length Structural Conductor 80' Surface 3777' Intermediate Production 10540' Liner 896' Plugs (measured) Junk (measured) Size Cemented 20" 260 sx Arcticset (Approx.) 10-3/4" 1100 sx PF 'E', 375 sx Class 'G' 7-5/8" 532 sx Class 'G' 5-1/2" 130 sx Class 'G' MD TVD 110' 110' 3813' 3519' 10572' 8353' 10414'-11310' 8210'-9035' Perforation depth: measured 11080' - 11110', 11118' - 11124', 11132' - 11142' true vertical 8821' - 8849', 8856' - 8862', 8869' - 8878' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 10417' Packers and SSSV (type and measured depth) 4-1/2" Camco SSSV Nipple at 2201'; 4-1/2" Baker 'SABL-3' packer at 10354' 13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch 14. Estimated date for commencing operation September 15, 2000 16. If proposal was verbally approved 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Name of approver Date Approved Contact Engineer Name/Number: Ted Stagg, 564-4694 Prepared By Name/Numbec Terrie Hubble, 564-4628 17. I hereby certify that the fore~o/j~g~ is true and correct to the best of my knowledge Signed --¢'//-P/cC- Title CT Drilling Engineer Ted Stagg Conditions of Approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ,-./ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- /.4..O ~ Approved by order of the Commission oRIGINAL SIGNED BY Approved Copy Form 10-403 Rev. 06/15/88 L) Taylu~ Returned Date IApproval No. ~.~O o. ~'~q Commissioner Date Q-lJ , Submit In Triplicate ARCO ALASKA, INC. TRSV Tubing NIP ..................... Casing PKR NOGO Liner ......... ",, Prudhoe Bay 15-34 APl: 500292247400 Well Type: PROD Angle @ TS: 24 deg @ 10629 SSSV Type: Odg Compltn: 5120/94 Angle @ TD: 21 deg @ 11310 Annular Fluid: Diesel 6.8~8.5 SW Last W/O: 5120194 Rev Reason: Picture Reference Log: Ref Log Date: 1/1/60 Last Update: 4/22/99 LastTag: 11158 TD: 11310 flKB Last Tag Date: 3~28~98 Max Hole 48 dog @ 6646 Angle: Depth Comment 10388 10388' MIN ID = 3.725" (4-1/2 Otis XN Nip) Date Note 5/20/94 ~ ELM @ 0: ELM Tubing Tail (Not Logged) Depth TVD Type Description ID 2201 2169 TRSV 4-1/2" Camco TRDP SSSV Nipple. Locked out 9/22/95. 3.855 10333 8137 NIP 4-1/2" Otis X Nipple 3.810 10354 8156 PKR 7" x 4-1/2" Baker SADL-3 Packer 0.000 10388 8186 NIP 4-1/2" Otis XN Nipple 3.725 10405 8202 NOGO 4-1/2" Otis XN Nipple 3.725 10416 8212 SOSUB 4-1/2"Shearout Sub 0.000 10418 8213 'l-fL 4-1/2" Tubing Tail W/L Re-entry Guide 0.000 Depth Description Comment 11305 FISH FISH: (2) CA-E-BK-2 (Lost 06/23/95) Size Weight Grade Top Btm Feet Description 10.750 45.50 NT-80 0 3813 3813 Casing 5.500 17.00 13CR-80 10403 11310 907 Liner 7.625 29.70 NT-95 HS 0 10572 10572 Casing Size Weight Grade Top Btm Feet Description 4.500 12.60 L-80 0 10418 10418 Tubing Stn MD TVD Man Man VMfr VType VOD Latch Port TRO Date Vlv Mfr Type Run Commenl 1 3268 3114 CAMCO (BMGMSPI~ CAMCO DMY 1.0 BK-2 0.000 0 6124/95 E 2 6110 5115 CAMCO (BMGMSPI~ CAMCO DMY 1.0 BK-2 0.000 0 5~20~94 E 3 8583 6819 CAMCO q3MGMSPI~ CAMCO DMY 1.0 BK-2 0.000 0 5120194 E 4 10223 8040 CAMCO (J3MGMSPI~ CAMCO DMY 1.0 BK-2 0.000 0 5~20~94 E Interval TVD Zone StatusFeetSPF Date Type Comment 11080- 8821 - 8849 ZONE O 30 6 7/30/94 IPERF 11110 lB 11118 - 8856 - 8862 ZONE 6 0 3/29/98 APERF 11124 lB 11132- 8869- 8878 ZONE O 10 6 7/30/94 IPERF 11142 lB SOSUB - TTL STATE OF ALASKA AL,'-',SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown_ Stimulate__ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. Development j~ 65' RKB 3. Address: Exploratory_ 7. Unit or Property: P.O. Box 100360 Stratagrapic_ Anchorage, AK 99510-0360 Service_ Prudhoe Bay Unit 4. Location of well at surface: 8. Well number: 1428' SNL, 945' EWL, Sec 22, T11N, R14E, UM 15-34 At top of productive interval: 9. Permit number/approval number: 488' NSL, 1186' EWL, Sec 14, T11N, R14E, UM 94-63 At effective depth: 10. APl number: 50-029-22474 At total depth: 11. Field/Pool: 523' NSL, 1441' EWL, Sec 14, T11N, R14E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 11310 feet Plugs (measured) PBTD Tagged at 11158' SLM (3/28/98). true vertical 9035 feet Effective Depth: measured 11158 feet Junk (measured) true vertical 8893 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 260 Sx Arcticset 110' 110' Surface 3777' 10-3/4" 1100 Sx PFE & 3813' 3519' 375 Sx Class G Production 10540' 7-5/8" 532 Sx Class G 10572' 8353' Liner 896' 5-1/2" 130 Sx Class G 11310' 9035' Perforation Depth measured 11080'-11110'; 11118'-11124'; 11132'-11142'; true vertical 8821'-8848'; 8856'-8862'; 8869'-8878' ii 0'[¢ 1 t ~9~ Alaska 0il Tubing (size, grade, and measured depth) 4-1/2" 12.6#, L-80, NSCT Tbg @ 10418' MD. '",~3. Oorl$. COi'[llTl-$Jor~l$ '~UChorage Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 10354' MD; 4-1/2" Camco TRDP SSA SSSV @ 2201' MD. 13. Stimulation or cement squeeze summary "f"\ I Intervals treated (measured)OEiG!i",,AL- Intervals treated (measured) 14. Representitive Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1135 24637 0 1615 Subsequent to operation 1851 33307 0 906 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _ X Oil_X Gas _ Suspended Service 17. I hereby certify that t~orego .in~~correct to the best of my knowledge.z¢~ Signed .~ / / .~// r Title: Engineering Supervisor Date 0 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 15-34 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 3/28/98: RIH & tagged PBTD @ 11158' SLM. 3129198: MIRU & PT BOP/riser to 3000 psi. RIH w/perforating guns & shot 6' of Add perforations @' 11118' - 11124' MD (Z1) Ref. Log: ZDEN/CNLGR/CCL 5/16/94. Used a 2-1/2" HSD carriers and shot 6 SPF, random orientation, at 60 degree phasing, & at underbalanced press. POOH w/perf gun. Noted guns fired. RD. Returned the well to production & obtained a valid well test. AOGCC Znd{v'fdu.,s'i We'ii "~' ~.. 'eoJo,g~'ca'i Nal:er"'fals Inve~ ,r"y PERHIT DATA T DATA~P L LIS 9~--063 ~i T 10S60 .... i 1282 DLL/ZDL/,'"cN/',SR 9~--'"06;3 ~/DL. Lf;GF.'/SP L. 10560---I i282 ~DL/CNL/'GR/CAL L '10560-11255 94--063 ~STVD L 10560--11282 9~-.-063 /{E, HP L 10560,'~11255 9/.~.-.-06:3 PERF L 10160---i i 1 9a*-06~ GR/";£CL/,JEWL L i0160.~11'18~ 9/.~,-063 ~ATPRESS L 10500-..Ii 12}2 9/~--¢06~ ~ R ,.COHP DATE; O'?t':~o/gt~ 9h. ~.. (} 63 ~E, F;' R 0/~/29-.- 0 ~20/94 94-06; ~]JRVEY R 0-11:309 SPERRY SUN 9~ ..... 06 ;3 05 / 2 '? / ' 20 ' '1 06/' . /' i 06 / 20/' 'i 06 / 20/ 1 06/20/ I 08/26/' 9~,- 1 08/26/' 9/~ 1 08/26/ 0 g / 2 '? / 0 g / 2 '? / 09/'2'? / 9~.~ ~l . 09 / '1/~./'9 .. Ar'e dr'y d'itch Was the ,..r'e we'i 'i Well C C, hlhl E N T S GeoQuest ' 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10031 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR IVIWD Disk D.S. 5"-6 A" .... 96003 l)U-'-,~-L B'uRsT TDT-P BORAX' ........................ 95122~ ................. Dis~' 5-15'A "<~o:'S.l, ~6-41g- DU~U'.. BURST NEuTRoN TDT-P BORAX .... 940426 .... D..$. 6-16 95397 DU^L BURST TDT-P MONITOR LOG 95.1.208. .............. D.S. 7-1 9 5 41 7 DUAL BURST TDT-P BORAX 9 51 2 01 ..................... D.S. 15-20 96000 I)UAL BURST TDT-P BORAX 951202 D,S. 15-34 96001 DUJI, L BURST TDT-P BORAX 951204 .................... · ~ , , ....... ~'/~ '7/0 ~- '71o? 7l~ SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. DATE: GeoQuest 500 w. Inlernational Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9968 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 1/5/96 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 2-17-- ~:~0-,~).--~ : GAS ENTRY LOG 951212 I -'' 1' D.S. 7-1 "~ '7 -' ~ /. TDT-" BORAX 9 51 2 01 1 1 D.S. 7-8 -~ ~" I ~O PRODUCTION PROFILE 9 51 209 1 1. _ O.S. 14-4 ~ ~ ~, ) PRODUCTION PROFILE 9 51.. 2 0 9 1 1 D.S. 15-20 ~ ~ "ct ~ TDT-P BORAX 9 51 2 0 2 I 1 D.S. 15-34 cj ~l "(~. TDT-P BORAX 951204 I 1 D..S. 15-47 "' C~ '.- I '7 L~ PRIMARY DEPTH CONTROl- GR/CCL 951 222 I ... 1 ................. ,, ,, , , ......... ,, SIGNED' Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. RECEIVED JAN 0 5 19 J8 DATE: ~,_~,._ ,.,;, ,.,_ ,.,, &,~,=s Cons. Commission Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATIO~,~' COMMISSION WELL COMPLETION OR REOOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SLJSPEI',[)ED [] ABAN~ED [] SERVICE r'"] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 94-63 3. Address B. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22474 4. Location of well at sudace 1428' SNL, 945' EWL, SEC. 22, T11N, R14E At Top Producing Interval 488' NSL, 1186' EWL, SEC. 14, T11N, R14E At Total Depth 523'NSL, 1441'EWL, SEC. 14, T11N, R14E Unil or Lease Name Prudhoe Bay Un# ~0. Well Number 15-34 1. Field and Pool Prudhoe Bay Field/Prudhoe Bay Pool 5. Elevation in feet (indicate KB, DF, etc.) ]6. Lease Designation and Serial No. KBE = 65.45' I ADL 28307 12. Date Spudded I~. Date T.D. Reached I'" Date Comp., Susp. or Aband. i,s.Wate, Depth, if offshore I,~. ,o. ol Completions 4/28/94 I 5/16/94 I 7/30/94 J N/A feet MSL J One 17. Total Depth (MD+TVD) j18. Plug Back Depth (MD+TVD)I19. Directional Survey FO. Depth where SSSV set ~21. Thickness of Permafrost 11310'MD/9034' TVD J 11232'MD/8962' TVD J YES [] NO [] J 2201' feet MD J 1900'(Approx.) 22. Type Electric or Other Logs Run D/L/SON/C/GR/CNL 23. CASING, LINER AND CEMENTING RECORD CASING SIZE WT. PER FT. GRADE HOLE SIZE CEMENTiI',~ RECORD AMOUNT PULLED 20" 91.5# H-40 30" 10-3/4" 45.5# NT-80 13-1/2" 7-5/8" 29. 7# NT95HS 9-7/8" 532 sx Class "G" 5-1/2" 17# 13CR80 6-3/4" 130 sx Class "G" SETTING DEPTH MD TOP BO'I-rOM 30' 110' 36' 3813' 32' 10572' 10414' 11310' 260 sx Arcticset (Approx.) 1100 sx PF "E"/375 sx "G" 24. Pedorations open to Production (MD+TVD of Top and Botlom and 25. TUBING RECORD inte~, size and number) Gun D~meter 3-3/8" 6 spf MD TVD 11080~11110' 8821~8848' 11132~11142' 8869~8878' SIZE 4-1/2", L-80 DEPTH SET (MD) 1O417' PACKER SET (MD) 10354' 26, ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protected w/l..O0 bbls dr)/crude 27. PRODUC~ TEST Date First Production 8/1/94 Dale of Test Hours Tested Flow Tubing Casing Pressure Press. 28. jMethod of Operation (Flowing, gas lilt, etc.) Fiowin9 FpEUCTION FOR rlL-BBL 3AS-MCF WATER-BBL PlOD ULATED ~:DIL-BBL GAS-MCF WATER-BBL / 124-HOUR RATE CORE DATA f HOKE SIZE. IGAS-OIL IL GRAVITY-APl (corr) RATIO Brief description of lithology, porosity, fractures, apparent dips, and presence ol oil, gas or water. Submit core chips. RECEIVED S EP 2 7 1994- Oil & Gas Cons. Commission Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Subsea Sag River 10495' 8215' Shublik 10566' 8282' Top Sadlerochit 10629' 8340' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~'/~ ~ ~~¢'-~ TitleOrillingEngineerSuoervisor Date ¢'''~O' ~ v INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". R E Form 10-407 SEP 2 7 Alaska.Oil .& 6as Cons. Commission Anch.nr~ BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: DS 15-34 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 04/28/94 02:00 SPUD: RELEASE: OPERATION: DRLG RIG: DOYON 9 WO/C RIG: DOYON 9 04/29/94 ( 1) TD: 639'( 639) 04/30/94 ( 2) TD: 2549' (1910) 05/01/94 (3) TD: 3830'(1281) 05/02/94 ( 4) TD: 3830'( 0) 05/03/94 ( 5) TD: 5979' (2149) 05/04/94 ( 6) TD: 6710'( 731) 05/05/94 ( 7) TD: 7950' (1240) DRILLING MW: 8.9 VIS:322 TURNKEY MOVE AROUND PITS. RIG ACCEPTED @ 14:00 ON 4/28/94. NU 20" HYDRIL & DIVERTER, MIX SPUD MUD. FUNCTION TEST DIVERTER, WITNESS: B. FOSTER AOGCC. PU BHA TEST MOTOR & MWD. FILL HOLE & TEST SURF. EQUIP. SPUD IN @ 21:00 HRS. 4/28/94 & DRILL W/BIT #1 T/639. BALL MILL IS BROKEN/DIKES BUILT T/HOLD SURF GRAVEL ON PAD. DRILLING MW: 9.4 VIS:189 DIRECTIONAL DRLG TO 2072'. CBU. SHORT TRIP TO HWDP. DIRECTIONAL DRLG W/ BIT #1. RUNNING 10 3/4" MW: 9.6 VIS:180 DIRECTIONAL DRLG TO 3830' W/ BIT #1. SHORT TRIP TO 2000', HOLE TIGHT F/ 2220-2602'. CBU. POH, HOLE OK. L/D BHA AND SERVICE MWD. R/U AND RUN 10 3/4" CSG. DRILLING CEMENT MW: 9.5 VIS:120 RUN 10 3/4" CSG AND LAND SAME. CIRC 1 HR AND CMT. DID 250 SX TOP JOB. L/D LANDING JNT AND N/D DIVERTER. N/U BOPE. TEST BOPE. P/U BHA. RIH AND TAG FIRM CMT @3724'. TEST KELLY. CIRC AND TEST CSG @ 3724' TO 3000#. DRLG HARD CMT AND FLOAT EQUIPMENT. DRILLING MW: 9.5 VIS: 0 DRILLING 9-7/8" HOLE F/3830 T/5979. POOH F/MOTOR MW: 9.8 VIS: 42 DRY JOB & DROP SURV. POOH BHA. SERV. MWD/WEAR RING. RIH REAM F/6032 T/6094. DRLG W/BIT #3 T/6710. CIRC & PUMP DRY MOB. POOH F/MUD MOTOR FAILURE, HOLE OK. BHA, SERV. MWD. DRILLING MW: 9.9 VIS: 44 RIH SLIP & CUT DL. CON'T RIH, DRLG AHEAD F/6710 T/7854. CIRC & COND MUD. WIPED HOLE BACK T/6700. OK. DRLG F/7854 T/7950. RECEIVED ^i~ska Oil & Gas Cons. Commission Anchora./ WELL · DS 15-34 OPERATION: RIG : DOYON 9 PAGE: 2 05/06/94 (8) TD: 8689' ( 739) 05/07/94 ( 9) TD: 8980' ( 291) 05/08/94 (10) TD: 9819'( 839) 05/09/94 (11) TD:10175' ( 356) 05/10/94 (12) TD:10512' ( 337) 05/11/94 (13) TD:10585'( 73) TRIPPING FOR BIT MW:10.1 VIS: 41 DRILLED F/ 7950-8645'. WIPED HOLE BACK TO 7850', NO TIGHT HOLE. DRILLED F/ 8645-8689' CIRCULATED BOTTOMS UP. TRIPPING FOR BIT #5. DRILLING MW:10.2 VIS: 58 CONTINUED TO POH, ONE CONE MISSING ON BIT, DOWNLOADED MWD, SET BACK MUD MOTOR AND MWD, PU REVERSE CIRCULATING BASKET AND XO. RIH WITH FISHING TOOLS. KELLY UP AND WASHED DOWN TO FISH F/ 8630-8689'. DROPPED BALL AND WORKED REVERSE CIRCULATING BASKET WITH FLOW RATE OF 5 BPM ON BOTTOM THEN CUT A ONE FOOT CORE. PUMPED SLUG AND POH WITH FISH. MU BHA AND NEW BIT. RIH, BROKE CIRCULATION AT 10 3/4" SHOE, CONTINUED TO RIH TO 8690' DRILLED AHEAD F/ 8690-8980' TFB #6 MW:10.3 VIS: 46 DRILLED AHEAD F/ 8980-9312'. WIPED HOLE BACK TO 8650', NO PROBLEMS. DRILLED AHEAD F/ 9312-9320'. CHANGED OUT WASHPIPE ON SWIVEL. DRILLED AHEAD TO 9819' CIRCULATED BOTTOMS UP, DROPPED SURVEY. TFB #6. POH FOR WASH OUT MW:10.4 VIS: 44 CONTINUED TFB #6. DOWNLOADED MW/). CHANGED OUT BIT AND PULLED WEAR BUSHING. INSTALLED TEST PLUG, TESTED RAMS, CHOKE MANIFOLD AND VALVES. PULLED TEST PLUG AND INSTALLED WEAR BUSHING. RIH WITH BIT AND MWD, INITIALIZED SAME. RIH TO 10 3/4" SHOE @ 3830' SLIPPED AND CUT DRILL LINE, BROKE CIRCULATION. CONTINUED TO RIH, WASHED F/ 9790 TO BOTTOM AT 9819'. DRILLED AHEAD F/ 9819-10175' HAD PRESSURE LOSS FROM 3100 PSI TO 2400 PSI. CHECKED SURFACE EQUIPMENT FOR LEAKS, NONE OBSERVED. TRIPPING PIPE AND LOOKING FOR WASHOUT. DRILLING MW:10.4 VIS: 40 CONTINUED TO POH LOOKING FOR WASHOUT. FOUND WASHOUT IN THIRD MONEL ABOVE THE MWD. WASHOUT OCCURED APPROXIMATELY 6 INCHES BELOW THE TOP OF THE MONEL TO WHERE THE PIN END OOF THE NONMAG STABILIZER WAS ALSO WASHED, LD MONEL AND STABILIZER, DOWN LOADED MWD, MU NEW STABILIZER AND MONEL, CHANGED OUT MWD AND TESTED, OK. RIH TO 3830' AND BROKE CIRCULATION, CONTINUED RIH TO 10145'. PRECAUTIONARY REAMED FROM 10145-10175'. DRILLED F/ 10175-10512' PREPARING TO PU 7 5/8" CSG MW:10.6 VIS: 41 DRILLED F/ 10512-10585'. CIRCULATED BOTTOMS UP. ATTEMPTED SHORT TRIP PULLED 8 STANDS AND PULLING 400K OVER. RIH AND WEIGHTED MUD UP TO 10.6 PPG, CIRCULATED AND CONDITIONED. WIPED HOLE 20 STANDS, HAD TIGHT HOLE FIRST 16 STANDS. CIRCULATED BOTTOMS UP WITH SWEEP. POH LD 5" DRILL PIPE. PU CASING RUNNING TOOLS. RECEIVED , ,), j . /~.l~.sl~ 0ii & Gas Cons. Commissior, Anchor2 WELL · DS 15-34 OPERATION: RIG : DOYON 9 PAGE: 3 05/12/94 (14) TD:10585' ( 0) 05/13/94 (15) TD: 10585' ( 0) TESTING BOPE MW: 9.1 VIS: 32 RUN 7 5/8". LOSE 60% RETURNS, BREAK CIRC. RIH W/ NO RETURNS. LAND CSG & BREAK CIRC. PUMP 60 BBL LCM PILL. CMT AS ABOVE, W/ CMT @ SHOE. CHK FLOATS & L/D L. J. & CASING TOOLS. INSTALL FMC PACKOFF & TEST. CHG TOP RAMS TO 3 1/2" CHG KELLY TO 3 1/2". INSTALL TEST PLUG & TEST BOPE. MW: 9.1 VIS: 0 05/13/94 (16) TD:10585' ( 0) 05/14/94 (17) TD:10605' ( 20) 05/15/94 (18) TD:llll7' ( 512) 05/16/94 (19) TD:ll310' ( 193) 05/17/94 (20) TD:ll310' ( 0) PU 3.5" DP. MW: 8.9 VIS: 31 TEST BOPE, KELLY & FLOOR VALVES. INSTALL WEAR RING. PU BHA & PU 3.5" DP. LOST AIR SLIP DIE IN HOLE. (APPROX 2.5 X 1 X 1.25") POOH WET. STD. BCK DYNADRILL & MWD ASSY. PU JUNK SUBS & MILL. SERV. WEAR RING. RIH T/5424 & PU DP. DRILLING MW: 9.2 VIS: 81 PU 3.5 DP. CUT & SLIP DL. WASH F/10294 T/10486. FISH F/JUNK W/JUNK SUBS & MILL. TEST CASG T/3400. @ 10486. OK. DRILLING FLOAT EQUIP & HARD CMT. PLUS 3' OF NEW HOLE T/10588. CBU. CHANGE OVER MUD T/9.1 PPG FLO-PRO. POOH C/O JUNK SUBS, REC'D SMALL PIECES OF DIE & FLOAT METAL. PU BHA. RIH W/DYNA DRILL & MWD. REAM F/10449 T/10588. PUMP HI-VIS SWEEP & DRILL W/BIT #7. POOH MW: 9.3 VIS: 71 DRILLING W/BIT #7 T/lll17. CBU. POOH & CHANGE BIT & BHA. POOH F/LOGS MW: 9.3 VIS: 68 RIH REAM F/11026 T/ 11117. DRLG W/BIT # 9 T/l1310 TD. CBU. SHORT TRIP T/SHOE. TIGHT @10994 & 10890. CIRC HI VIS SWEEP. POOH T/SHOE. OK. PUMP DRY JOB. POOH F/LOGS. RIH W/LINER MW: 9.3 VIS: 69 POOH F/LOGS. LD MWD & BHA. RU ATLAS & LOG F/l1310 T/10.75" SHOE. CHNG RAMS T/3.5 & TEST DOORS. DHNG HYDRILL RUBBER & TEST. INSTALL WEAR RING. RU WTHRFRD & RUN 5.5" 13CR LINER & HNGR LTPP. CIRC PIPE VOL.RIH W/LINER ON 3.5" DP. RECEIVED Alaska Oil & Gas Cons. Commission Anchor~ j. WELL : DS 15-34 OPERAT I ON: RIG : DOYON 9 PAGE: 4 05/18/94 (21) TD:ll310 PB:11232 05/19/94 (22) TD:ll310 PB:11232 05/20/94 (23) TD:ll310 PB:11232 CHNG OVER MUD T/FSW MW: 9.3 FSW RIH W/LINER ON DP. CIRC @ SHOE. RIH, OPEN HOLE OK. CIRC 2 HRS & CMT LINER. SET LTP W/4500, RELEASE, REV. OUT 7.5 BBLS CMT RETURNS. POOH 8 STNDS. CBU POOH LD BAKER TOOLS. PU 3-1/8 DCS & 2-7/8 DRIL PIPE. SPACE OUT 7-5/8 CASG SCRAPPER. RIH T/11135. CIRC. CUT & SLIP 54' DL. WASH F/11135 T/11232. LANDG COLLAR. CBU. TEST CAS T/3500, CHANGE OVER MUD T/FILTERED SEAWATER. RUN COMP. EQUIP MW: 9.3 FSW CHANGED OVER T/8.5 PPG SEAH20 W/CORROSION INHIBITOR ADDED. POOH & LD 3-1/8" DC'S & 2-3/8" DP. RIH W/4.75 BHA & 3.5" HWDP. IN DERRICK & LD SAME. BROKE DOWN KELLY. PULL WEAR BUSHING CHNG OUT RAMS T/4.5 ON BOPE. TEST, PULL PLUG. RU & RUN 4.5 COMPLETION. RIG RELEASED MW: 9.3 FSW RIH W/4.5 COMP. EQUIP. CONNCTD 4.5"CL F/SSSV T/HNGR & TEST T/5000/10MIN. OK. LND 4.5" TBG STRING/RILDS. PRESS TBG T/4000/30 MIN. & SET SABL-3 PKR @10354 W/TBG TAIL @ 10417.5. BLEED PRESS DWN T/2000 ON TBG. PRESS TEST ANNUL. T/3500/30 MIN. OK. SHEAR OUT RP IN GLM #1 W/2900. PUMP 100 BBLS DIESEL DN ANNUL & U-TUBE. INSTALL 2-WAY CHK VALVE. CO RAMS ON BOPE T/5". LD CL HNDLG TOOLS. ND BOPE. CONNECT CL THRU BBG SPOOL/TEST T/5000. NU X-MAS TREE/TEST T/5000/10 MIN. OK. RELEASE RIG & 02:00 HRS ON 5/20/94. SIGNATURE: (drilling superintendent) DATE: SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 PRUDHOE BAY DRILLING PBU/15-34 500292247400 NORTH SLOPE COMPUTATION DATE: 5/17/94 DATE OF SURVEY: 051694 MWD SURVEY JOB NUMBER: AK-MW-40043 KELLY BUSHING ELEV. = 68.30 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG M~ COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -68.30 163 163.07 94.77 256 256.00 187.70 434 433.99 365.69 523 522.99 454.69 0 0 N .00 E .00 .00N .00E 0 13 S 52.00 W .14 .20S .26W 0 10 S 61.70 W .07 .38S .53W 0 31 S 42.00 W .21 1.12S 1.31W 0 41 S 31.70 W .22 1.88S 1.87W .O0 -.31 -.62 -1.60 -2.37 611 610.94 542.64 3 34 N 84.20 E 4.59 2.05S .59E 702 701.72 633.42 5 20 N 80.53 E 1.96 1.07S 7.60E 792 791.24 722.94 5 36 N 78.73 E .36 .48N 16.04E 882 880.76 812.46 6 12 N 73.61 E .89 2.71N 25.02E 972 970.21 901'.91 6 24 N 71.06 E .38 5.72N 34.44E -.10 6.86 15.35 24.57 34.46 1061 1058.62 990.32 6 48 N 74.12 E .60 8.77N 44.22E 1157 1153.89 1085.59 7 57 N 78.19 E 1.31 11.69N 56.21E 1252 1247.70 1179.40 10 6 N 75.30 E 2.31 15.15N 70.71E 1358 1351.96 1283.66 10 37 N 74.49 E .51 20.13N 89.13E 1443 1435.42 1367.12 11 13 N 72.98 E .78 24.65N 104.60E 44.70 56.99 71.84 90.88 106.99 1538 1528.39 1460.09 12 26 N 69.23 E 1.52 30.99N 123.02E 1633 1621.10 1552.80 12 45 N 70.61 E .45 38.10N 142.49E 1729 1714.23 1645.93 15 15 N 71.97 E 2.62 45.53N 164.50E 1824 1805.91 1737.61 15 7 N 73.26 E .38 52.97N 188.25E 1919 1897.46 1829.16 15 50 N 70.35 E 1.11 60.90N 212.33E 126.47 147.19 170.41 195.30 220.65 2014 1988.90 1920.60 15 38 N 65.37 E 1.44 70.60N 236.18E 2110 2081.33 2013.03 15 40 N 66.82 E .41 81.09N 259.87E 2205 2172.80 2104.50 15 41 N 66.13 E .20 91.35N 283.42E 2301 2264.76 2196.46 17 36 N 69.43 E 2.23 101.70N 308.89E 2396 2354.58 2286.28 20 21 N 69.03 E 2.90 112.67N 337.78E 246.35 272.16 297.75 325.19 356.07 2491 2442.96 2374.66 22 37 N 66.65 E 2.56 125.82N 369.99E 2587 2530.71 2462.41 25 11 N 68.19 E 2.74 140.74N 405.92E 2681 2615.62 2547.32 25 36 N 68.58 E .48 155.59N 443.40E 2778 2702.56 2634.26 27 34 N 70.87 E 2.27 170.64N 484.22E 2872 2784.45 2716.15 30 43 N 69.56 E 3.43 186.12N 527.18E 390.80 429.61 469.88 513.37 559.02 2968 2866.49 2798.19 31 49 N 69.27 E 1.17 203.64N 573.83E 3063 2946.14 2877.84 34 I0 N 70.17 E 2.53 221.56N 622.36E 3159 ' 3025.36 2957.06 34 36 N 69.93 E .47 240.06N 673.34E 3254 3102.61 3034.31 36 32 N 70.84 E 2.12 258.61N 725.40E 3350 3178.78 3110.48 38 25 N 69.48 E 2.13 278.44N 780.34E 608.82 660.54 714.76 770.01 828.41 RECEIVED Gas Con~. Commission Anchor~ ,. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 PRUDHOE BAY DRILLING PBU/15-34 500292247400 NORTH SLOPE COMPUTATION DATE: 5/17/9 DATE OF SURVEY: 051694 MWD SURVEY JOB NUMBER: AK-MW-40043 KELLY BUSHING ELEV. = 68.30 OPERATOR: ARCO ALASKA INC FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 3445 3252.37 3184.07 3541 3324.52 3256.22 3636 3393.22 3324.92 3732 3461.40 3393.10 3772 3489.93 3421.63 COURS INCLN DG MN 40 1 42 30 44 50 44 33 44 37 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST N 69.24 E 1.70 299.62N 836.55E N 67.67 E 2.79 322.89N 895.43E N 67.23 E 2.49 348.05N 956.00E N 67.04 E .33 374.27N 1018.18E N 68.04 E 1.76 385.01N 1044.18E VERT. SECT. 888.44 951.67 1017.11 1084.41 1112.48 3883 3569.77 3501.47 3978 3637.13 3568.83 4073 3702.71 3634.41 4168 3768.43 3700.13 4262 3833.96 3765'.66 43 46 45 52 46 47 45 39 45 56 4358 3900.72 3832.42 45 56 4454 3967.63 3899.33 45 41 4549 4033.33 3965.03 46 47 4644 4098.43 4030.13 46 42 4741 4165.12 4096.82 46 25 4835 4230.07 4161.77 4930 4295.16 4226.86 5025 4359.56 4291.26 5121 4424.67 4356.37 5216 4489.19 4420.89 5313 4554.79 4486.50 5408 4620.08 4551.78 5503 4686.13 4617.83 5597 4752.66 4684.~36 5692 4820.24 4751.94 5789 4888.41 4820.11 5883 4955.00 4886.70 5979 5022.81 4954.51 6073 5089.32 5021.02 6168 5155.62 5087.32 6263 5221.35 5153.05 6359 5286.98 5218.69 6455 5352.33 5284.03 6549 5416.05 5347.75 6646 5481.27 5412.97 46 9 47 20 47 18 47 15 47 12 47 19 46 10 45 25 44 49 44 30 45 40 45 2 44 13 45 59 45 36 46 49 46 54 47 18 47 30 47 49 N 68.76 E .88 413.60N 1116.35E N 67.07 E 2.54 '438.79N 1178.39E N 66.51 E 1.06 465.87N 1241.55E N 67.82 E 1.56 492.50N 1304.77E N 70.16 E 1.81 516.65N 1367.67E N 69.35 E .61 540.53N 1432.39E N 68.86 E .45 565.08N 1496.70E N 71.07 E 2.04 588.57N 1561.15E N 70.24 E .64 611.48N 1626.43E N 70.04 E .32 635.41N 1692.68E N 69.26 E .66 659.04N 1756.39E N 72.30 E 2.64 681.80N 1821.71E N 72.20 E .08 703.09N 1888.23E N 71.60 E .46 725.00N 1955.27E N 72.01 E .32 746.78N 2021.52E N 72.90 E .69 768.18N 2089.23E N 71.05 E 1.86 789.65N 2155.23E N 67.86 E 2.54 813.47N 2218.82E N 67.25 E .79 838.98N 2280.58E N 67.76 E .50 864.53N 2342.29E N 68.75 E 1.40 889.86N 2405.81E N 68.76 E .66 914.29N 2468.65E N 68.96 E .87 938.43N 2531.08E N 69.02 E 1.88 962.37N 2593.40E N 68.44 E .59 987.10N 2656.94E N 70.29 E 1.90 1011.26N 2721.12E N 72.68 E 1.82 1033.50N 2787.53E N 72.31 E .51 1054.65N 2854.60E N 71.60 E .59 1076.12N 2920.50E N 73.69 E 1.63 1097.47N 2988.83E 1190.01 1256.84 1325.35 1393.77 1461.08 1530.04 1598.83 1667.41 1736.59 1807.01 1874.94 1944.10 2013.94 2084.46 2154.20 2225.20 2294.60 2362.47 2429.14 2495.79 2564.07 2631.42 2698.30 2765.00 2833.11 2901.64 2971.68 3042.00 3111.30 3182.86 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 PRUDHOE BAY DRILLING PBU/15-34 500292247400 NORTH SLOPE COMPUTATION DATE: 5/17/94 DATE OF SURVEY~ 051694 MWD SURVEY JOB NUMBER: AK-MW-40043 KELLY BUSHING ELEV. = 68.30 FT. OPERATOR: ARCO ALASKA INC TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6743 5547.25 5478.95 6837 5612.20 5543.90 6932 5677.49 5609.19 7028 5743.82 5675.52 7124 5809.67 5741.37 46 17 46 28 46 40 46 25 46 22 N 69.82 E 3.32 1119.63N 3056.14E N 70.33 E .44 1142.86N 3120.24E N 71.56 E .96 1165.39N 3185.46E N 71.28 E .34 1187.70N 3251.82E N 72.27 E .75 1209.32N 3317.49E 3253.73 3321.89 3390.89 3460.90 3530.04 7220 5875.81 5807.51 7315 5941.96 5873.66 7409 6007.35 5939.05 7504 6074.42 6006.12 7600 6141.11 6072%81 46 12 45 58 45 38 45 24 46 12 N 71.48 E .62 1230.84N 3383.23E N 70.32 E .91 1253.32N 3448.15E N 72.44 E 1.66 1274.79N 3511.87E N 70.22 E 1.67 1296.65N 3576.58E N 73.46 E 2.57 1318.01N 3641.74E 3599.21 3667.90 3735.15 3803.45 3872.02 7695 6207.03 6138.73 7790 6272.59 6204.29 7886 6338.43 6270.13 7980 6403.35 6335.05 8076 6468.87 6400.57 46 14 46 3 46 47 46 43 46 38 N 73.12 E .26 1337.79N 3707.63E N 72.71 E .37 1357.84N 3772.86E N 71.56 E 1.17 1379.08N 3838.74E N 70.69 E .67 1401.42N 3904.07E N 69.03 E 1.27 1425.34N 3969.31E 3940.78 4008.99 4078.20 4147.25 4216.71 8171 6533.88 6465.58 8263 6597.12 6528.82 8358 6662.59 6594.29 8453 6728.20 6659.90 8550 6795.71 6727.41 47 2 46 28 46 24 45 57 45 22 N 71.56 E 1.99 1448.71N 4034.57E N 70.58 E 1.00 1470.52N 4098.18E N 72.36 E 1.36 1492.40N 4163.45E N 72.95 E .66 1512.78N 4228.71E N 73.23 E .64 1532.88N 4294.81E 4286.02 4353.26 4422.10 4490.46 4559.50 8625 6849.45 6781.15 8709 6909.74 6841.44 8804 6978.17 6909.87 8899 7046.26 6977.96 8995 7113.42 7045.12 44 5 43 34 44 4 44 54 46 33 N 71.70 E 2.21 1548.91N 4345.57E N 73.49 E 1.60 1566.23N 4400.80E N 68.89 E 3.40 1587.40N 4462.92E N 69.19 E .90 1611.32N 4525.37E N 68.49 E 1.80 1636.19N 4589.61E 4612.73 4670.59 4736.22 4803.04 4871.87 9090 7178.67 7110.37 9185 7244.33 7176.03 9280 7310.76 7242.46 9376 7377.66 7309.36 9471 7443.80 7375.50 46 18 45 55 45 54 45 38 45 22 N 69.09 E .53 1661.01N 4653.56E N 68.24 E .77 1685.84N 4717.15E N 70.84 E 1.96 1709.81N 4781.40E N 71.17 E .37 1732.19N 4846.38E N 71.45 E .35 1753.76N 4910.17E 4940.40 5008.59 5077.13 5145.85 5213.19 9534 7488.54 7420.24 9629 7557.24 7488.94 9725 7629.43 7561.13 9756 7653.33 7585.03 9819 7702.63 7634.33 45 6 42 14 39 58 39 51 37 43 N 70.72 E .92 1768.39N 4952.85E N 74.46 E 4.06 1788.06N 5015.39E N 74.46 E 2.36 1804.94N 5076.08E N 74.53 E .41 1810.28N 5095.35E N 73.19 E 3.63 1821.28N 5133.41E 5258.31 5323.85 5386.76 5406.72 5446.30 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 PRUDHOE BAY DRILLING PBU/15-34 500292247400 NORTH SLOPE COMPUTATION DATE: 5/17/94 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN DATE OF SURVEY: 051694 MWD SURVEY JOB NUMBER: AK-MW-40043 KELLY BUSHING ELEV. = 68.30 FT. OPERATOR: ARCO ALASKA INC COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9915 7779.27 7710.97 35 49 N 74.75 E 2.21 1837.12N 5188.45E 10010 7857.49 7789.19 33 31 N 75.36 E 2.45 1851.08N 5240.72E 10106 7938.51 7870.21 31 28 N 74.89 E 2.15 1864.32N 5290.59E 10200 8019.64 7951.34 28 54 N 75.14 E 2.73 1876.53N 5336.19E 10295 8103.22 8034.92 27 2 N 77.24 E 2.23 1887.14N 5379.28E 5503.51 5557.50 5608.99 5656.09 5700.32 10391 8189.56 8121.26 26 24 N 78.85 E .99 1896.16N 5421.81E 10455 8247.10 8178.80 25 33 N 78.45 E 1.36 i901.67N 5449.31E 10488 8276.55 8208.25 24 59 N 78.28 E 1.76 1904.48N 5462.93E 10521 8306.23 8237.93 24 46 N 78.35 E .68 1907.27N 5476.41E 10626 8402.17 8333%87 24 19 N 79.60 E .65 1915.65N 5519.41E 5743.49 5771.31 5785.11 5798.77 5842.19 10658 8431.22 8362.92 23 44 N 79.60 E 1.82 1917.99N 5532.15E 10722 8489.57 8421.27 23 22 N 80.79 E .95 1922.32N 5557.21E 10817 8577.37 8509.07 22 21 N 81.49 E 1.11 1928.03N 5593.78E 10912 8665.68 8597.38 22 28 N 81.28 E .15 1933.48N 5629.79E 11007 8753.07 8684.77 22 21 N 82.28 E .42 1938.63N 5665.45E 5855.01 5880.14 5916.62 5952.48 5987.92 11071 8812.18 8743.88 21 53 N 83.30 E .93 1941.65N 5689.29E 11165 8899.23 8830.93 21 47 N 83.51 E .14 1945.66N 5723.97E 11249 8977.59 8909.29 20 53 N 83.70 E 1.07 1949.07N 5754.41E 11309 9033.83 8965.53 20 53 N 83.70 E .03 1951.43N 5775.76E 6011.47 6045.60 6075.53 6096.51 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 6096.51 FEET AT NORTH 71 DEG. 19 MIN. EAST AT MD = 11309 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 71.33 DEG. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/15-34 500292247400 NORTH SLOPE COMPUTATION DATE: 5/17/94 DATE OF SURVEY: 051694 JOB NU~4BER: AK-MW-40043 KELLY BUSHING ELEV. = 68.30 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASDVERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -68.30 .00 N .00 E 1000 998.04 929.74 6.73 N 37.40 E 2000 1975.35 1907.05 69.01 N 232.73 E 3000 2893.62 2825.32 209.60 N 589.58 E 4000 3652.15 3583.85 444.82 N 1192.65 E .0O 1.96 1.96 24.65 22.69 106.38 81.73 347.85 241.47 5000 4342.31 4274.01 697.37 N 1870.43 E 6000 5037.80 4969.50 943.67 N 2544.70 E 7000 5723.91 5655.61 1180.99 N 3232.01 E 8000 6416.46 6348.16 1406.02 N 3917.22 E 9000 7116.29 7048.00 1637.30 N 4592.43 E 657.69 309.83 962.20 304.51 1276.09 313.88 1583.54 307.45 1883.71 300.17 10000 7848.66 7780.36 1849.60 N 5235.06 E 11000 8746.20 8677.90 1938.25 N 5662.66 E 11309 9033.83 8965.53 1951.43 N 5775.76 E 2151.34 267.63 2253.80 102.46 2275.53 21.73 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING DATE OF SURVEY: 051694 PBU/15-34 500292247400 JOB NUMBER: AK-MW-40043 NORTH SLOPE KELLY BUSHING ELEV. = 68.30 FT. COMPUTATION' DATE: 5/17/94 OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASDVERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -68.30 68 68.30 .00 168 168.30 100.00 268 268.30 200.00 368 368.30 300.00 .00 N .00 E .00 N .00 E .21 S .27 W .40 S .56 W .67 S .90 W .00 .00 .00 .00 .00 .00 .00 .00 .00 468 468.30 400.00 568 568.30 500.00 668 668.30 600%00 768 768.30 700.00 869 868.30 800.00 1.36 S 1.52 W 2.14 S 1.32 W 1.58 S 4.52 E .04 N 13.83 E 2.33 N 23.72 E .01 .00 .02 .01 .20 .19 .65 .45 1.17 .52 970 968.30 900.00 1070 1068.30 1000.00 1171 1168.30 1100.00 1272 1268.30 1200.00 1374 1368.30 1300.00 5.65 N 34.24 E 9.09 N 45.33 E 12.10 N 58.18 E 16.09 N 74.26 E 20.95 N 92.08 E 1.77 .61 2.45 .67 3.32 .87 4.70 1.38 6.39 1.69 1476 1468.30 1400.00 1578 1568.30 1500.00 1681 1668.30 1600.00 1785 1768.30 1700.00 1888 1868.30 1800.00 26. 34. 41. 50. 58. 56 N 110.84 E 11 N 131.26 E 66 N 152.63 E 04 N 178.51 E 12 N 204.54 E 8.29 1.90 10.64 2.35 13.18 2.54 16.81 3.64 20.46 3.65 1992 1968.30 1900.00 2096 2068.30 2000.~00 2200 2168.30 2100.00 2304 2268.30 2200.00 2410 2368.30 2300.00 68. 79. 90. 102. 114. 19 N 230.94 E 65 N 256.51 E 83 N 282.26 E 11 N 309.96 E 49 N 342.53 E 24.38 3.92 28.23 3.85 32.10 3.87 36.49 4.39 42.40 5.91 2518 2468.30 2400.00 2628 2568.30 2500.00 2739 2668.30 2600.00 2853 2768.30 2700.00 2970 2868.30 2800.00 130. 147. 164. 182. 204. 05 N 379.89 E 31 N 422.35 E 77 N 467.33 E 84 N 518.32 E 04 N 574.88 E 50.30 7.90 60.32 10.01 71.36 11.04 85.06 13.71 101.90 16.83 3089 2968.30 2900.00 3211 3068.30 3000.00 3336 3168.30 3100.00 3465 3268.30 3200.00 3600 3368.30 3300.00 226. 25O. 275. 304. 338. 66 N 636.52 E 27 N 701.50 E 53 N 772.55 E 47 N 849.19 E 45 N 933.14 E 121.55 19.65 143.13 21.58 168.39 25.27 197.68 29.28 232.62 34.94 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/15-34 500292247400 NORTH SLOPE COMPUTATION DATE: 5/17/94 DATE OF SURVEY: 051694 JOB NUMBER: AK-MW-40043 KELLY BUSHING ELEV. = 68.30 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3741 3468.30 3881 3568.30 4023 3668.30 4168 3768.30 4311 3868.30 3400.00 3500.00 3600.00 3700.00 3800.00 376.91 N 1024.44 E 413.09 N 1115.04 E 451.35 N 1208.04 E 492.45 N 1304.65 E 528.75 N 1401.02 E 273.39 40.76 313.10 39.71 354.94 41.84 399.95 45.00 443.51 43.56 4455 3968.30 4600 4068.30 4746 4168.30 4890 4268.30 5038 4368.30 3900.00 4000.00 4100~00 4200.00 4300.00 565.32 N 1497.34 E 600.67 N 1596.34 E 636.55 N 1695.82 E 672.90 N 1794.00 E 705.99 N 1897.26 E 487.09 43.58 532.19 45.11 577.74 45.55 622.52 44.78 670.03 47.51 5185 4468.30 5333 4568.30 5477 4668.30 5619 4768.30 5760 4868.30 4400.00 4500.00 4600.00 4700.00 4800.00 739.81 N 2000.07 E 772.49 N 2103.23 E 806.65 N 2202.06 E 844.99 N 2294.91 E 882.40 N 2386.62 E 717.39 47.36 764.73 47.35 809.45 44.71 851.20 41.75 891.96 40.75 5902 4968.30 6043 5068.30 6186 5168.30 6332 5268.30 6478 5368.30 4900.00 5000.00 5100.00 5200.00 5300.00 919.12 N 2481.06 E 954.58 N 2573.08 E 991.86 N 2668.98 E 1027.55 N 2768.47 E 1059.91 N 2871.10 E 934.32 42.36 974.77 40.46 1018.25 43.48 1063.78 45.53 1110.69 46.90 6627 5468.30 6773 5568.30 6919 5668.30 7064 5768.30 7209 5868.30 5400.00 5500.00 5600.00 5700.00 5800.00 1093.45 N 2975.08 E 1127.23 N 3076.82 E 1162.31 N 3176.21 E 1195.95 N 3276.19 E 1228.35 N 3375.81 E 1158.80 48.12 1205.44 46.64 1250.73 45.29 1296.08 45.35 1340.91 44.83 7353 5968.30 7496 6068.30 7639 6168.30 7784 6268.30 7929 6368.30 5900.00 6000.00 6100.00 6200.00 6300.00 1262.49 N 3473.81 E 1294.55 N 3570.73 E 1326.09 N 3668.93 E 1356.52 N 3768.62 E 1389.17 N 3868.90 E 1385.03 44.12 1427.95 42.92 1471.64 43.69 1516.08 44.44 1561.42 45.34 8075 6468.30 8221 6568.30 8367 6668.30 8511 6768.30 8651 6868.30 6400.00 6500.00 6600.00 6700.00 6800.00 1425.12 N 3968.74 E 1460.43 N 4069.57 E 1494.22 N 4169.17 E 1524.86 N 4268.21 E 1554.64 N 4362.90 E 1607.25 45.82 1653.59 46.35 1698.73 45.13 1742.77 44.05 1783.69 40.92 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 8 PRUDHOE BAY DRILLING PBU/15-34 500292247400 NORTH SLOPE COMPUTATION DATE: 5/17/94 DATE OF SURVEY: 051694 JOB NUMBER: AK-MW-40043 KELLY BUSHING ELEV. = 68.30 FT. OPERATOR: ARCO ALASKA INC INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 8790 6968.30 6900.00 1584.04 N 4453.99 E 1822.13 38.44 8930 7068.30 7000.00 1619.12 N 4545.89 E 1862.41 40.28 9075 7168.30 7100.00 1657.14 N 4643.42 E 1907.18 44.77 9219 7268.30 7200.00 1695.02 N 4740.14 E 1951.37 44.19 9363 7368.30 7300.00 1729.10 N 4837.33 E 1994.93 43.56 9505 7468.30 7400.00 1761.69 N 4933.65 E 2037.55 42.62 9644 7568.30 7500.00 1790.75 N 5025.06 E 2076.16 38.61 9776 7668.30 7600.00 1813.62 N 5107.40 E 2107.72 31.56 9901 7768.30 7700.00 1835.03 N 5180.81 E 2133.63 25.92 10023 7868.30 7800.00 1852.89 N 5247.65 E 2155.26 21.62 10141 7968.30 7900.00 1868.97 N 5307.87 E 2173.11 17.86 10255 8068.30 8000.00 1883.17 N 5361.85 E 2187.65 14.54 10368 8168.30 8100.00 1894.11 N 5411.45 E 2199.81 12.16 10479 8268.30 8200.00 1903.70 N 5459.16 E 2211.03 11.21 10589 8368.30 8300.00 1912.88 N 5504.35 E 2221.15 10.12 10698 8468.30 8400.00 1920.84 N 5548.13 E 2230.61 9.46 10807 8568.30 8500.00 1927.47 N 5590.10 E 2239.26 8.65 10915 8668.30 8600.00 1933.64 N 5630.86 E 2247.43 8.17 11023 8768.30 8700.00 1939.47 N 5671.66 E 2255.59 8.16 11131 8868.30 8800.00 1944.26 N 5711.68 E 2263.41 7.82 11239 8968.30 8900.00 1948.68 N 5750.88 E 2270.91 7.50 11309 9033.83 8965.~53 1951.43 N 5775.76 E 2275.53 4.62 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS GeoQuest Soo W. Infemational Airport Road Anchorage, AK 99618-1199 ATTN: Shertie NO. 8882 Company: Alaska 011 & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 8/24/94 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar "'/" (---.--.~( D.S. 4-4 PERF 'RECORD (8/2/94) 1 1 -~..- ?7_ D.S. 4-7 ST#1 PROD pRo'FILE (8/7/94) .. 1 1 ~/o - / ~,,~ D.S. 9-40 STATIC PRESSURE SURVEY (8/2/94) 1 1 ~'~ - ~'c> D.S. 11-33 PERF RECORD (8/3/94) I 1 ~c/'-~'O D.S. 11-33 JEWELRY LOG (8!3/94) 1 1 c~,~_~- 3 A, :D.S. 12-02 INJEC PROFILE (8/4/94) 1 1 /~ D.S. 12-04A .PROD PROFILE (8/4/94) ' 1 · 1 ~cy-/.-3 D.S. 15-34 STATIC PRESSURE SURVEY (8/1/94) 1 1 ~'~' D.S. 15-34 ... JEWELRY LOG (7/30/94) ' 1 ..1 9'~'- C "~ D.S. 15-34 PERF RECORD (7/30/94) 1 1 ~i D.S. 15-35 STATIC PRESSURE SURVEY (8/1/94)' 1 1 _9'9'- ?? D.S. 15-37 PERF RECORD (8/1/94) 1 1 ~¥-) 9_ D.S. 15-37 JEWELRY LOG (8/1/94) 1 1 / Please sign and return one copy of this transrnittal to Sherrle at the above address. Thc~k you. DATE: /~Cz"'. ARCO Alaska, Inc. Date- Subject' Fr.om/Location- Telephone' To/Location: June 15, 1994 ARCO Open Hole Finals John E. DeGrey/ATO-1529 (907) 263-4310 Distribution P.O. Box 100360,' ;ichorage, AK 99510~~, Transmittal#: 94047 '~ ~' i Well Log Date i Tool Type Number (M-D-Y). · I?_.% i 3-22 5-15-94 i Collar Log " ~ 15-34 , 5-16-94 ! ¢/DLL,GR/SP // ~ 15-34 ! 5-16-94 i/~Borehole Prof ~ i 15-34 ! 5-16-94 i-/ SSTVD k~! 15-34 ! 5-16-94i¢'CNL, GR/CAL. i Run, Scale i 1,2"&5" ) ~ 5II [ 1 i 1,2" & 5" i 1,2" & 5" Contractor Atlas Atlas Atlas Atlas Atlas Number of Records: 5 Distribution: Central Files Phillips ANO-8 Geology BPX Exxon State of Alaska Mobil D & M PB Well Files Please acknowledge receipt by signing and returning a copy of transmittal. By:. ~~. ~__~/_ ..~/~_ Date: RF CEIVED JUN 2 0 1~9~ Alaska Oil & Gas C~ns, Cornrnissiol~ Anchorage ARCO Alaska, inc.. Is a Subsidiary of AlJantlcRIchfieldCompany ARCO Alaska, Inc. Date: Subject- From/Location: Telephone: To/Location: P.O. Box 100360, Ar May 24, 1994 Transmittal #: ARCO open hole Magnetic tape(s) John E. DeGrey/ATO-1529 (907) 263-4310 Distribution 94041 rage, AK 2.01 Well i Log Date i Tape Type Number i (M-D-Y) I 01-09A i 03-17-94 i.~DLI_/CN/GR/AC/ i 03-32A ¢ 05-01-94 i~,.C/GR & DLL/CN/ I i GR i 4-5A i 05-03-94 i ACIGR & DLL/CN/ ~ i 1''/' 4CAL/GR i 34APH ! 03-06-94 i D~UAC/CN/GR i 11-04A i 11-35 i 11-36 i 12'13A i i ~s-a4 ~ ! 03-01-94 ivDLL/ZDL/CN/GR ~ 5-19-94 i,./' ZDL/CN Run, Footage 11786- 12637 9200-9654 8250- 10292 9120- 11658 8410-9341 8670-9471 05-08-94 ?DIFL/ZDL/CN/GR 9300-9969 03-31-94i Dv.LL/AC/CN/G R 8607- i 10380 03-30-93 i v" MWD/GR i 1, 9971- I I 8767 05-16-94 i ,,,~L/ZDL/ON/GR i 10560- ! 11282 03'06'93 i "/ MWD/GR i' 1' 9635'7999 Contractor Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Sch Sch Sch Number of Records: 11 E, DeGrey Distribution: Bob Ocanas Phillips BPX Exxon ~St~a~t~f:Al~t-s-k~~ Please acknowl.,edge receipt by signing and returning a copy of transmittal. By: Date' O ~ ,"' ~' ~/~- Alaska Oil & Gas Cons. Oon;mission Anchorage ARCO Alaska, Inc. Is a Subsidiary of Afl~nt~cRIchfleldComl3any MEMORANDU a TO: THRU: David Chairrr~~ Blair Wondzell, "~~ 0~./~~ P. I. Supervisor" State ot Alaska Alaska Oil and Gas Conservation Commission DATE: April 28, 1994 FILE NO: EGFID2BD.doc Bobby Foster ~.~ FROM: ~r~ SUBJECT: Petroleum Inspector Diverter Test & Inspection ARCO - PBU - DS 15 - 34 Prudhoe Bay Field Thursday, April 28, 1994: ! traveled to ARCO's PBU well DS 15 - 34 being drilled by Doyon rig 9 and witnessed the function test and inspected the diverter system for compliance with AOGCC regulations. As the attached Diverter System Test Report shows the system functioned properly and was installed in an exceptable manner to the AOGCC. Summary: I witnessed the satisfactory diverter system test and inspected same for proper installation. Attachment: EFGID2BD.XLS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Diverter Systems Inspection Report Operation: Ddg Contractor: DOYON Rig No. Operator: ARCO ALASKA Oper. Rep.: Well Name: DS 15-34 Rig Rep.: Location: Sec. 22 T. 11N R. 14E Date: 4/28/94 Development X Exploratory: 9 PTD # 94-63 Rig Ph. # 659-4836 JERRY HAUBTHER TIM Merdian U MISC. INSPECTIONS: ACCUMULATOR SYSTEM: Location Gen.: OK Well Sign: OK Systems Pressure: 3000 psig Housekeeping: OK (Gen.) Ddg. Rig: OK Pressure After Closure: 1700 psig Reserve Pit: N / A Flare Pit: N / A 200 psi Attained After Closure: min. 23 sec. Systems Pressure Attained: I min. 25 sec. Nitrogen Bottles: 5 (~ 2500 DIVERTER SYSTEM INSPECTION: Diverter Size:' 20" in. Divert Valve(s) Full Opening: 16" Valve(s) Auto & Simultaneous: 16" Vent Line(s) Size: 16" in. Vent Line(s) Length: 75' ft. Line(s) Bifurcated: NO Line(s) Down Wind: YES Line(s) Anchored: YES Tums Targeted / Long Radius: N / A psig MUD SYSTEM INSPECTION: Light Alarm Trip Tank: OK OK Mud Pits: OK OK Flow Monitor: OK OK GAS DETECTORS: Light Alarm Methane NOTE Hydrogen Sulfide: N / A ~_75' -~1 16" kNIFE VALVE 20"ANNULAR PREVENTER TIE DOWN Non Compliance Items ~ Repair Items Within Day (s) And contact the Inspector @ 659-3607 Remarks: Gas dectors were tested 3 days previously by Doug Amos -- Question about number of methane detector heads being resolved Distribution orig, - Well File c- OpeflRep c- Database c - Tdp Rpt File c - Inspector AOGCC REP.: OPERATOR REP.: EGFID2BD.XLS BOBBY D. FOSTER .]ERR Y HABER TUER DVTRINSP.XLT (REV. 1/94) ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 April 22, 1994 Terry Jordan Drilling Engineer Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit DS 15-34 ARCO Alaska, Inc. Permit No: 94-63 Sur. Loc. 1428'SNL, 945'EWL, Sec. 22, TllN, R14E, UM Btmhole Loc. 540'NSL, 1435'EWL, Sec. 14, TllN, R14E, UM Dear Mr. Jordan: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill dOes not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W. ~ln Chairman BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 Ila. Type of work Drill [] Redrill Flllb. Type of well. Exploratory[] Strut/graphic Test [] Development Oil [] Re-Entry [] DeepenF11 Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. KBE = 65.45 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchora~Te. Alaska 99519-6612 ADL 28307 4. Location of well at surface 7. Unit or property Name .11. Type Bond(s,,e 20 ,~c 25.025) 1428' SNL, 945' EWL, SEC. 22, T11N, R14E Prudhoe Bay Unit At top of productive interval 8. Well number Number 518' NSL, 1369' EWL, SEC. 14, T11N, R14E 15-34 U-630610 At total depth 9. Approximate spud date Amount 540' NSL, 1435' EWL, SEC. 14, T11N, R14E 4/25/94 $200,000.00 12. Distance to nearest ]13. Distance to nearest well 4. Number of acres in property15. Proposed depth(MDa, dTVD) property line , ADL 28306-1435 feet No close approach feet 2560 11342'MD/9026' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 2o ^^c 25.035 (e)(2)) Kickoff depth soo feet Maximum hole angle 4x o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 pslg 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 30' 30' 110' 110' 260 sx Arcticset 13-1/2' 10-3/4" 45.5# NT8OLHE Butt 3782' 29' 29' 3811' 3535' 1070 sx PF/375 sx Class "G" 9-7/8" 7-5/8" 29.7# NT95HS NSCC 10602' 28' 28' 10630' 8357' 535 sx Class "G" 6-3/4" 5-1/2" 17# 13CR80 NSCC 862' 10480' 8218' 11342' 9025' 130 sx Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECFIVEL') Surface -~ Intermediate Production /'" !';~i:( '1 !~ ~0~ '~ Liner '~, i.' :',t,"i ""~ Perforation depth' measured ;~,,,;.~,.,, L.'.~ & i_~:~:.; Cons. 60i¥~mJssi0n true vertical Anchorage 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction anal¥sis l'-I Seabed report[] 20 AAC 25.050 requirementsl-I 21. I hereby certify ¢2J.~,f¢ ~. L~/[ ~J/ that the foregoing is true and correct to the best of my knowledge Signed ' ,{..~ Title Drilling Engineer Supervisor ¢ Date ~/- [ ~;-~ ¢/ Commission Use Only [ o~ ~'~' JforJSee cover letterother Permit Number IAPI number Appr date~ _., - requirements uonaiuons" ' of apprOval Samples required [] Yes [] No Mud Icg required- []Ye~ [] No Hydrogen sulfide measures [] Ye~s,.,,.Eg._No,. Directional survey required [] Yes [] No Required working pressure for BO~Lq?I~/21~II.gr1~3~;J~/ 1~5M; [-IlOU' I-I15M; Other: uaV/d-W. Johnston by order of Approved by Commissioner [ne commission Date~?-¥;~o),_- Form 10-401 Rev. 12-1-85 Submit in triplicate ~'~/' I Well Name: 115-34 Well Plan Summary Type of Well (producer or injector): I Producer ISurface Location: Target Location: Bottom Hole Location: 1428'FNL, 945'FWL, SEC22, TllN, R14E, UM 518'FSL, 1369'FWL, SEC14, TllN, R14E, UM 540'FSL, 1435~-WL, SEC14, TI iN, R14E, UM I AFENumber: I 4J0236 I I EstimatedStart Date: 14/25/94 I Rig: I DOYON 9 I I IOperating days t° c°mplete: 21 DAYS] IMD: I 11342 I ITVD: 19026 [ IKBE: I65.45 I IwellDesign(c°nventi°nal'slimh°le'etc'): ISLIMHOLE:SURFACE'INTERMED'LINER Formation Markers: Formation Tops MD TVD (BKB) Base of Permafrost 10 3/4" Casing 3811 3535 10'md above TT4/T5/SV3 TT4/T5/SV3 3545 UGNU WEST SAK K12 K10 K5 BASE HRZ PUT RIVER LCU (KINGAK) JURASSIC B (KINGAK) SAG RIVER SHUBLIK 8347 7 5/8" Casing 10630 8357 10' tvd below top of Shublik Sadlerochit (ZA) Zone 3 Zone 2 Tango Romeo Zone 1 Base Sadlerochit CGOC 5 1/2" Liner 11342 9025 Well Plan Summary RECEIVED DS15-34: CKH :: ..... u,.;rlllrllSSlO r~ Page 1 I I Casing/Tubing Program-. Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 30" 20" 91.5# H-40 Weld 80' 30'/30' 110'/110' 13 1/2" 10 3/4" 45.5# NT80LHE Buttress 3782 29/29 3811/3535 9 7/8" 7 5/8" 29.7# NT95HS NSCC 10602 28/28 10630/8357 6 3/4" 5 1/2" 17# 13CR80 NSCC 862 10480/8218 11342/9025 none 3 1/2" CTU Coil 10400 Logging Program: ] Open Hole Logs: 13 1/2" Hole Section: MWD Directional from surface to TD. 9 7/8" Hole Section: MWD Directional from surface shoe to TD 6 3/4" Hole Section: DIL/Sonic/GR from TD to Top of Sadlerochit 6 3/4" Hole Section: ZDensity/CNL/GR from TD to 200md' above HRZ Keep GR "on" until surface shoe. ,,,ECEIVED Well Plan Summary DS15-34: CKH Page 2 Mud Program: [Special design considerations I Surface Mud Properties: I 13 1/2" hole section Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 100 20 15 20 8.0 15 to to to to to to to 9.2 300 60 40 80 10 25 Intermediate Mud Properties: I 9 7/8" hole section Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.2 30 10 3 10 8.5 15 tO tO tO tO tO tO tO 10.5 50 25 10 50 10 6 Production Mud Properties: ] 6 3/4" hole section Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.9 30 15 5 10 9 <6 to to to to to to to 9.0 50 20 10 20 10 <7 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: ]KOP: [ 500 Maximum Hole Angle: Close Approach Well: None 47 The above listed wells will be secured during the close approach. Cement Data: Casing/Liner Lead: Sxs/Wt/Yield Tail: Sxs/Wt/Yield Comments 10 3/4" 1070/12/2.17 375/15.8/1.16 Perm & Class "G" 7 5/8" 330/11.0/3.24 205/15.8/1.15 Class "G" 5 1/2" none 130/15.7/1.20 Class "G" Well Plan Summary DS15-34: CKH Page 3 . , . , . . , . . 10. 11. 12. 13. 14. 15. 16. PROPOSED DRILLING AND COMPLETION PROGRAM DS15-34 Operations Summary MIRU drilling rig. NU diverter and function test same. Spud well and drill a 13 1/2" hole to surface hole section TD as per directional plan. Set 10 3/4" casing and cement same. Test casing to 3000 psi for 30 minutes. Nipple up BOPs and test same to 5000 psi. PU a 9 7/8" bit and BHA and drill 10' of new hole and perform leakoff test. Continue drilling 9 7/8" hole to intermediate hole section TD as per directional plan. Run and set 7 5/8" casing and cement same. PU 6 3/4" BHA and test casing to 3500 psi for 30 minutes. Drill 6 3/4" hole as per directional plan. Run wireline logs as specified in the Well Plan. RIH with 5 1/2" liner and cement same; set liner hanger and liner top packer. RIH with liner cleanout assembly with a 7 5/8" casing scraper spaced out to 7 5/8" x 5 1/2" liner lap top. Test 7 5/8" casing and 5 1/2" liner with 3500 psi for 30 minutes. Displace out mud with brine. RU with lubricator and RIH perf guns and shoot specified perforation interval as per Operations Engineering. PU 7 5/8" isolation packer (with a tubing tail) with a positive tubing tail plug and set within 7 5/8" liner with DP. Test packer by testing DP x 7 5/8" liner annulus to 3500 psi. Prior to POOH with DP, displace well again w/seawater with corrosion inhibitor. POOH with DP to 2000 tvd, freeze protect 7 5/8" casing from 2000'tvd to surface. LD DP. , .. 17. Thru BOP stack, MU 13 1/2" x 6.812" False Bowl w/a 6.812" BPV installed. RILDS. Test same to 3000# w/BOP blind shut. 18. ND BOP stack. 19. NU 13 5/8" holdown flange and 7.06" bore valve. Test same thru port. 20. Pull 6.812" BPV. 21. MU CTU hanger in the false bowl w/4" 2 way check. RILDS. 22. MU blind flange to 7" valve w/blind and tap. 23. Test against 2 way check in CT hanger thru blind flange. 24. RDMO rig from location. Anticipated BHP: Maximum Anticipated Surface Pressure: Planned Completion Fluid: 3650 psi @ 8800' SS 3650 psi @ 8800' SS 2800 psi 8.6 ppg filtered sea water Notes- a. b. c, d. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.003. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/ft). Based on previous logs on DS15 Pad, no potential productive zones are anticipated above 7800' ss (Put River). No potential hazardous levels of H2S are anticipated in this well. DS15-34 CKH April 18, 1994 R EC'EIVED P~ ~.~no._ .~o.y P~ udb, oe Bo.y Ii, ill Site 15 15-34 Wp4 VERTICAL VLmd SCALE ~ f'~. / DIVISI[1N TV]D REF: ~ ~-,_RTICAL SECT]]]W Pd:_-F: l~ It-EAD C~CI~ 80ND TIEIN Dm ilLi n 'd'~-~ Un;± 4/13/~ 1048 om H~LIB~T~ HZRIZENTAL VIEl,' (TRUE NORTH) ~SALE 500 fM;. / DIV!SIEN StRVEY REF: ~1 I HEAD 0 0 VERTICAL SECTIEN P~KE: 7!,!4° ]MI) g385,~ KD 11348,03 VS 6093,60 N/S '. 970,02 N E/¥ 5766,37 E I~e Piotted S~ ea~d By Ched~ed By ; 4/~3/g4 ,, I ; I~lZO° 8 9213 MD ~ / STAR]' [}-BL.rL1} ,. :- ;:;,; ull & &~m Oor~s. Commission ~ /~ ~ 0 O~ 0.~ 0 0 N 0 E ~ /~ / ST~T ~ O~ 0.~ ~O 0 N 0 E ~ ~ ~ 1~ ~.~ 71.14° ~13 1~8 N ~ E WELL PERMIT CHECKLIST COMPANY PROGRAM: exp [] dev ~ redrll [] serv [] //~ ON/OFF SBORE O~ ADMINISTRATION 1. 2. 3. 4. 5. 6. '7. 8. 9. 10. 11. 12. 13. Permit fee attached ................... N Lease number appropriate.. N Unique well name and number N Well located in a defined pool N Well located proper distance from drlg unit boundary.. N Well located proper distance from other wells... N Sufficient acreage available in drilling unit ...... N If deviated, is wellbore plat included ......... N Operator only affected party .............. N Operator has appropriate bond in force ......... Y~ N Permit can be issued without conservation order ..... y~~ N Permit can be issued without administrative approval.. N Can permit be approved before 15-day wait ........ N ENGINEERING 14. Conductor string provided ............... 15. Surface casing protects all known USDWs ........ 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost... 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic& equip list adequate 25. BOPEs adequate .................... 26. BOPE press rating adequate; test to ~--~ psig.~ 27. Choke manifold complies w/API RP-53 (May 84) ....... 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............. GEOLOGY / 30. Permit can be issued w/o hydrogen sulfide measures .... Y ~ 31. Data presented on potential overpressure zones ..... Y/ N 32. Seismic analysis 9f shallow gas zones .......... 7 N 33. Seabed condition survey (if off-shore) ......... /~ N 34. Contact name/phone for weekly progress reports . . . / Y N [exploratory only] GEOLOGY: ENGINEERING: COMMI SS ION: Comments/Instructions: HOW/jo- A:~:ORMS~heldist rev 03/94 ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME : ARCO ALASKA INC. WELL NAME : DS 15-34 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292247400 REFERENCE NO : 96001 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 96/02/12 ORIGIN : FLIC REEL NAME : 96001 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA INC, DS 15-34, PRUDHOE BAY, 50-029-22474-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 96/02/12 ORIGIN : FLIC TAPE NAME : 96001 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA INC, DS 15-34, PRUDHOE BAY, 50-029-22474-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: DS 15-34 API NUMBER: 500292247400 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 12-FEB-96 JOB NUMBER: 96001 LOGGING ENGINEER: SCHWARTZ OPERATOR WITNESS: J. HUPP SURFACE LOCATION SECTION: 22 TOWNSHIP: 11N RANGE: 14E FNL: 1428 FSL: FEL: FWL: 945 ELEVATION(FT FROM MSL O) KELLY BUSHING: 65.50 DERRICK FLOOR: GROUND LEVEL: 30.60 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 10.750 3813.0 45.50 7.625 10572.0 29.70 5.500 11310.0 17.00 4.500 10418.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center BASELINE CURVE FOR SNIFTS LDWG TOOL CODE: DLL LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH 88888.0 11163.5 11158.0 11155.5 11151.0 11150.5 11148.0 11145.0 11137.0 11131.5 11129.0 11126.5 11121.0 11117.0 11110.0 11109.5 11102.0 11099.5 11092.0 11086.5 11083.0 11073.5 11072.5 11057.5 11057.0 11040.5 11023.0 11017.0 11012.0 11011.0 10989.0 10987.0 10980.0 10978.0 10967.5 10967.0 10959.5 10958.0 10956.0 10934.5 10934.0 10914.0 10913.5 10910.5 10905.0 12-FEB-1996 11:09 .......... EQUIVALENT UNSNIFTED DEPTH .......... GRCH TDTP 88885.0 88885.0 11160.5 11154.5 11152.5 11147.5 11147.0 11144.5 11141.0 11136.5 11129.5 11126.5 11124.5 11124.5 11118.5 11118.5 11115.0 11115.5 11108.0 11108.0 11101.0 11101.0 11091.5 11085.0 11085.0 11072.5 11072.5 11056.5 11056.5 11039.5 11022.5 11016.5 11013.0 11010.5 10988.0 10984.0 10977.5 10975.5 10965.5 10966.0 10958.5 10957.0 10954.5 10933.0 10933.5 10913.5 10913.5 10909.5 10904.5 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing 10904.0 10867.0 10854.5 10833.0 10816.5 10790.0 10758.0 10755.5 10751.5 10749.0 10747.0 10746.5 10742.0 10739.0 10737.0 10735.0 10732.0 10702.0 10697.0 10696.5 10689.5 10677.0 10676.5 10673.0 10656.0 10655.5 10650.5 10650.0 10645.0 10639.5 10634.5 10634.0 10631.5 10628.0 10623.0 10621.5 10619.0 10614.0 10612.0 10601.0 10595.5 10591.5 10589.5 10586.5 10579.0 1O577.O 10575.0 10573.5 10569.5 100.0 $ REMARKS: 10904. 10867. 10854. 10833. 10816. 10790. 10757. 10755. 10752. 10749. Center 0 0 10866.5 0 0 5 10816.5 0 10790.0 5 0 0 10752.0 0 10747.0 10747.0 10743.5 10740.0 10737.0 10732.5 10697.0 10677.5 10673.0 10656.5 10650.5 10646.0 10635.0 12-FEB-1996 11:09 10736.0 10703.0 10698.0 10688.0 10677.0 10656.5 10650.5 10639.5 10635.5 10632.5 10628.5 10622.5 10622.0 10619.0 10614.0 10612.5 10601.5 10595.5 10592.0 10589.0 10586.5 10578.0 10577.0 10574.5 10572.5 10568.5 99.0 99.0 The depth adjustments shown above reflect cased hole GR to open hole GR and cased hole SIGM to open hole GR. All other TDTP curves were carried with the SIGM shifts. $ PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: **** FILE HEADER **** FILE NAHE : EDIT .001 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11168.0 10496.0 TDTP 11170.0 10496.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP $ REMARKS: This file contains TDTP Pass #1'(Base pass #1). No ass to pass shifts were applied to t is data. h LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 5 TUNI VALU DEFI COUN NORTH SLOPE County STAT ALASKA NATI USA WITN J. HUPP SON 100243 PDAT MSL EPD FT O. LMF KB APD FT 65.5 EKB FT 65.5 ECL FT 30.6 TDD FT 11310. TDL FT 11177. BLI FT 11170. TLI FT 10496. DFT DEAD CRUDE/BORAX TLAB 13:45 04-DEC-1995 State or Province Nation Witness Name Service Order Number Permanent datum Elevation of Permanent Datum Log Measured From Above Permanent Datum Elevation of Kelly Bushing Elevation of Ground Level Total Depth - Driller Total Depth Logger Bottom Log Interval Top Log Interval Drilling Fluid Type Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN TotaI counts analyzed near detector (TDTP) TCAF Total counts analyzed far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude GR API-Corrected Gamma Ray LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ..... ..... 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) oo ooo oo o 6666666666- SIGM TDTP CU 100243 O0 000 O0 0 I 1 1 4 68 0000000000 TPHI TDTP PU-S 100243 O0 000 O0 0 i i 1 4 68 0000000000 SBHF TDTP CU 100243 O0 000 O0 0 1 1 1 4 68 0000000000 SBHN TDTP CU 100243 O0 000 O0 0 i i 1 4 68 0000000000 SIGC TDTP CU 100243 O0 000 O0 0 1 i 1 4 68 0000000000 SIBH TDTP CU 100243 O0 000 O0 0 1 I 1 4 68 0000000000 TRAT TDTP 100243 O0 000 O0 0 1 1 1 4 68 0000000000 SDSI TDTP CU 100243 O0 000 O0 0 i I 1 4 68 0000000000 BACK TDTP CPS 100243 O0 000 O0 0 1 1 1 4 68 0000000000 FBAC TDTP CPS 100243 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 100243 O0 000 O0 0 i I 1 4 68 0000000000 TCAF TDTP CPS ]00243 O0 000 O0 0 1 I 1 4 68 0000000000 TCND TDTP CPS 100243 O0 000 O0 0 i I 1 4 68 0000000000 TCFD TDTP CPS 100243 O0 000 O0 0 I 1 1 4 68 0000000000 TSCN TDTP CPS 100243 O0 000 O0 0 1 I 1 4 68 0000000000 TSCF TDTP CPS 100243 O0 000 O0 0 1 1 1 4 68 0000000000 INND TDTP CPS 100243 O0 000 O0 0 1 1 1 4 68 0000000000 INFD TDTP CPS 100243 O0 000 O0 0 i i I 4 68 0000000000 GRCH TDTP GAPI 100243 O0 000 O0 0 1 1 1 4 68 0000000000 TENS TDTP LB 100243 O0 000 O0 0 1 1 1 4 68 0000000000 CCL TDTP V 100243 O0 000 O0 0 1 i 1 4 68 0000000000 GR DLL GAPI 100243 O0 000 O0 0 1 1 I 4 68 0000000000 LIS Tal~e Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: ** DATA ** DEPT. 11229.500 SIGM.TDTP SBHN.TDTP -999.250 SIGC.TDTP SDSI.TDTP -999.250 BACK.TDTP TCAF.TDTP -999.250 TCND.TDTP TSCF.TDTP -999.250 INND.TDTP TENS.TDTP -999.250 CCL.TDTP DEPT. 10495.000 SIGM.TDTP SBHN.TDTP 55.103 SIGC.TDTP SDSI.TDTP 1.192 BACK.TDTP TCAF.TDTP 4123.147 TCND.TDTP TSCF.TDTP 866.310 INND.TDTP TENS.TDTP 1430.000 CCL.TDTP -999.250 TPHI.TDTP -999.250 -999.250 SIBH.TDTP -999.250 -999.250 FBAC.TDTP -999.250 -999.250 TCFD.TDTP -999.250 -999.250 INFD.TDTP -999.250 -999.250 GR.DLL 130.280 27.633 TPHI.TDTP 45.911 1.256 SIBH.TDTP 86.311 132.694 FBAC.TDTP 33.139 17885.598 TCFD.TDTP 4571.568 1928.413 INFD.TDTP 327.596 0.000 GR.DLL -999.250 SBHF.TDTP TRAT.TDTP TCAN.TDTP TSCN.TDTP GRCH.TDTP SBHF.TDTP TRAT.TDTP TCAN.TDTP TSCN.TDTP GRCH.TDTP -999.250 -999.250 -999.250 -999.250 -999.250 51.483 1.846 12642.793 2656.363 53.500 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE FILE HEADER FILE NUMBER: EDITED CURVES Depth shifted and PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY LDWG TOOL CODE GRCH TDTP 2 clipped 2 0.5000 curves for each pass START DEPTH 11168.0 11170.0 STOP DEPTH 10492.0 10492.0 in separate files. LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: $ # CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 88884.5 88884.0 11164.5 11160.5 11158.0 11154.5 11151.0 11147.5 11147.5 11149.5 11145.5 11148.0 11144.0 11134.5 11133.0 11133.5 11129.5 11130.5 11129.0 11129.5 11127.0 11127.0 11124.5 11126.5 11124.0 11123.5 11121.0 11122.5 11120.0 11120.0 11118.5 11118.5 11116.5 11117.5 11115.0 11114.5 11112.5 11111.5 11109.0 11110.5 11109.0 11107.5 11105.5 11102.5 11101.0 11095.5 11093.5 11092.0 11093,0 11091.5 11090.5 11087.5 11086.0 11083.0 11085.0 11078.5 11078.5 11074.5 11074.0 11073.5 11072.0 11067.5 11066.0 11063.5 11062.5 11059.5 11059.0 11057.0 11056.5 11055.5 11054.5 11050.5 11050.0 11046.5 11045.5 11043.5 11042.5 11042.5 11042.0 11038.5 11038.0 11034.5 11033.5 11027.5 11027.0 11022.5 11021.5 11018.5 11018.5 11014.5 11015.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 11010.5 11007.5 11007.0 11006.5 11003.5 11003.5 11002.5 10999.5 10999.0 10995.5 10994.5 10991.5 10990.0 10990.5 10978.5 10975.5 10974.0 10974.5 10971.5 10969.5 10970.5 10967.5 10965.5 10963.5 10962.0 10959.5 10958.0 10958.5 10955.5 10954.5 10954.5 10950.5 10946.5 10943.5 10942.5 10942.5 10939.5 10938.0 10938.5 10930.5 10927.5 10926.0 10926.5 10923.5 10922.5 10922.5 10919.5 10919.0 10918.5 10914.5 10910.5 10907.5 10907.0 10906.5 10903.5 10903.0 10891.5 10891.5 10890.5 10887.5 10886.5 10886.5 10882.5 10870.5 10867.0 10866.5 10866.5 10863.5 10863.0 10858.5 10855.0 10854.0 10854.5 10847.5 10847.0 10846.5 10843.5 10843.5 10842.5 10834.5 11011.0 11006.0 11002.0 10987.5 10975.5 10973.0 10969.5 10957.5 10953.0 10949.0 10946.0 10941.5 10938.0 10930.0 10926.5 10922.5 10918.0 10914.5 10910.5 10906.0 10890.0 1O885.5 10882.5 10870.5 10866.0 10858.0 10853.5 10845.5 10842.5 10834.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 10 10830.5 10830.0 10827.5 10827.5 10826.5 10826.0 10823.5 10823.0 10822.5 10822.5 10817.0 10816.5 10811.5 10811.0 10810.5 10810.5 10807.5 10807.5 10806.5 10806.0 10803.5 10803.0 10802.5 10802.5 10799.5 10800.0 10795.5 10795.0 10794.5 10794.5 10791.5 10791.0 10790.5 10790.0 10787.5 10787.0 10786.5 10786.5 10782.5 10782.0 10778.5 10778.0 10775.5 10775.0 10774.5 10774.5 10771.5 10771.5 10766.5 10766.5 10762.5 10763.0 10758.5 10758.5 10752.0 10752.0 10747.5 10747.5 10746.5 10746.5 10745.0 10745.0 10743.5 10744.0 10742.5 10743.5 10735.5 10736.5 10731.5 10732.0 10727.5 10727.5 10723.5 10724.0 10719.5 10719.5 10715.5 10715.0 10711.5 10711.5 10710.5 10711.5 10706.5 10707.0 10702.5 10703.5 10698.5 10700.0 10694.5 10695.0 10691.5 10691.5 10690.5 10689.5 10687.5 10688.0 10686.5 10685.0 10682.5 10681.5 10678.5 10679.0 10675.5 10676.0 10674.5 10675.5 10671.5 10671.5 10670.5 10671.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 11 10667.5 10667.5 10666.5 10663.5 10664.0 10662.5 10658.5 10654.5 10651.5 10651.5 10650.5 10647.5 10647.0 10646.5 10643.5 10643.5 10642.5 10639.5 10640.0 10638.5 10634.5 10630.5 10622.5 10619.5 10620.0 10618.5 10615.5 10615.5 10611.5 10611.5 10607.5 10608.0 10603.5 10603.5 10602.5 10599.5 10599.5 10598.5 10595.5 10595.0 10586.5 10582.5 10578.5 10575.5 10575.0 10574.5 10571.5 10570.5 10570.5 10566.5 10562.5 10558.5 10555.5 10554.0 10551,0 10550.0 10549.5 10548.0 10542.5 10538.5 10534.5 10531.5 10530.5 10530.5 10527.5 10527.0 10526.5 10522.5 10518.5 10514.5 10511.5 10510.5 10510.5 100.0 99.0 $ 10667.0 10663.5 10659.5 10655.0 10650.5 10646.5 10643.0 10640.0 10635.5 10630.0 10622.0 10618.5 10602.5 10599.0 10587.0 10582.5 10579.0 10574.5 10569.5 10565.5 10562.0 10557.5 10541.5 10537.0 10533.5 10529.5 10525.0 10520.5 10518.0 10515.0 10509.5 99.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 REMARKS: This file contains TDTP Pass #2(Base pass #2). The depth shifts shown above relect GRCH pass #2 to GRCH  ass #1 and SIGM pass #2 to SIGM pass #1. LIS FORMAT DATA PAGE: 12 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing EGL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRAT SDSI BACK FBAC Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector Background Count Rate - Far Detector LIS Tape Verification List!ng Schlumberger Alaska Computing Center 12-FEB-1996 11:09 DEFI TC^N Total counts analyzed - near detector (TDT?) TCAF Total counts analyzed far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude PAGE: 13 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE i 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 i ** SET TYPE - CHAN ** NAHE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ........ .... .... i ..... ..... ..... .... SIGH TDTP CU 100243 O0 000 O0 0 2 1 i 4 68 0000000000 TPHI TDTP PU-S 100243 O0 000 O0 0 2 I I 4 68 0000000000 SBHF TDTP CU 100243 O0 000 O0 0 2 1 1 4 68 0000000000 SBHN TDTP CU 100243 O0 000 O0 0 2 1 1 4 68 0000000000 SIGC TDTP CU 100243 O0 000 O0 0 2 I I 4 68 0000000000 SIBH TDTP CU 100243 O0 000 O0 0 2 i 1 4 68 0000000000 TRAT TDTP 100243 O0 000 O0 0 2 i I 4 68 0000000000 LIS Tape Verification Listing Schlumoerger Alaska Computing Center 12-FEB-1996 11:09 PAGE: NAME SERV UNIT SERVICE API API API--~i-~[~--~G~--~G~--~i~--~---~~- ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) SDSI TDTP CU 10024B O0 000 O0 0 2 1 i ---~ ..... ~ .... $~$~$-- BACK TDTP CPS 100243 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 100243 O0 000 O0 0 2 i i 4 68 0000000000 TCAN TDTP CPS 100243 O0 000 O0 0 2 1 i 4 68 0000000000 TCAF TDTP CPS 100243 O0 000 O0 0 2 1 I 4 68 0000000000 TCND TDTP CPS 100243 O0 000 O0 0 2 1 I 4 68 0000000000 TCFD TDTP CPS 100243 O0 000 O0 0 2 1 1 4 68 0000000000 TSCN TDTP CPS 100243 O0 000 O0 0 2 i i 4 68 0000000000 TSCF TDTP CPS 100243 O0 000 O0 0 2 I i 4 68 0000000000 INND TDTP CPS 100243 O0 000 O0 0 2 1 i 4 68 0000000000 INFD TDTP CPS 100243 O0 000 O0 0 2 i I 4 68 0000000000 GRCH TDTP GAPI 100243 O0 000 O0 0 2 i 1 4 68 0000000000 TENS TDTP LB 100243 O0 000 O0 0 2 i 1 4 68 0000000000 CCL TDTP V 100243 O0 000 O0 0 2 1 1 4 68 0000000000 14 ** DATA ** DEPT. 11166.000 SIGM.TDTP 27.957 TPHI.TDTP 35.543 SBHF.TDTP SBHN.TDTP 49.690 SIGC.TDTP 2.064 SIBH.TDTP 70.646 TRAT.TDTP SDSI.TDTP 0.674 BACK.TDTP 182.029 FBAC.TDTP 66.861 TCAN.TDTP TCAF.TDTP 8271.992 TCND.TDTP 18079.723 TCFD.TDTP 5163.743 TSCN.TDTP TSCF.TDTP 1079.811 INND.TDTP 1867.618 INFD.TDTP 301.338 GRCH.TDTP TENS.TDTP 1685.000 CCL.TDTP 0.000 DEPT. 10491.000 SIGM.TDTP 20.577 TPHI.TDTP 28.749 SBHF.TDTP SBHN.TDTP 54.342 SIGC.TDTP 1.346 SIBH.TDTP 84.111 TRAT.TDTP SDSI.TDTP 0.429 BACK.TDTP 181.576 FBAC.TDTP 43.474 TCAN.TDTP TCAF.TDTP 8594.137 TCND.TDTP 19504.992 TCFD.TDTP 5972.133 TSCN.TDTP TSCF.TDTP 1651.496 INND.TDTP 1973.830 INFD.TDTP 367.013 GRCH.TDTP TENS.TDTP 1530.000 CCL.TDTP 0.000 40.107 1.638 24230.395 2845.632 -999.250 45.185 1.653 21304.531 4008.246 67.688 ** END OF DATA ** **** FILE FILE NAME SERVICE VERSION DATE MAX REC SIZE FILE TYPE LAST FILE TRAILER **** : EDIT .002 : FLIC : 001C01 : 96/02/12 : 1024 : LO : LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 15 **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11168.0 10494.0 TDTP 11170.0 10494.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: i .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP 11158.5 11155.0 11150.5 11146.0 11147.5 11143.5 11143.0 11139.0 11139.5 11135.5 11134.5 11132.5 11134.0 11131.5 11131.5 11129.5 11130.5 11129.0 11127.5 11124.5 11126.5 11124.5 11122.5 11120.5 11121.5 11118.5 11118.5 11117.0 11111.5 11109.0 11099.5 11098.0 11098.5 11100.5 11095.5 11094.0 11094.5 11096.0 11091.5 11090.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 16 11090.5 11082.5 11078.5 11074.5 11073.0 11072.0 11063.5 11062.5 11059.5 11059.0 11057.0 11054.5 11050.5 11046.5 11043.5 11043.0 11042.5 11038.5 11034.5 11027.5 11027.5 11026.5 11023.5 11023.0 11022.5 11018.5 11017.0 11016.5 11011.0 11010.5 11010.5 10995.5 10995.0 10991.5 10990.5 10990.5 10987.5 10986.5 10983.5 10982.0 10982.5 10978.5 10975.5 10974.0 10974.5 10971.5 10969.5 10970.5 10967.5 10965.5 10966.5 10959.5 10958.0 10958.5 10955.5 10954.5 10954.5 10950.5 10946.5 10943.5 10942.5 10942.5 10939.5 10938.0 10938.5 10934.5 10930.5 10927.5 10926.0 10923.5 10922.5 10919.5 10919.0 10918.5 10915.5 10914.5 10914.5 10911.5 10910.5 11092.5 11084.5 11079.0 11074.5 11056.5 11054.5 11050.0 11045.5 11042.0 11038.0 11033.5 11025.5 11022.0 11019.0 11011.0 10987.5 10979.5 10976.0 10972.5 10969.0 10965.5 10957.5 10953.0 10949.0 10945.5 10941.5 10938.0 10934.0 10930.5 10918.5 10915.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 17 10910.5 10906.5 10903.5 10902.5 10899.5 10899.5 10898.5 10895.5 10895.0 10894.5 10891.5 10891.5 10890.5 10887.5 10886.5 10886.5 10882.5 10878.5 10874.5 10870.5 10866.5 10866.5 10862.5 10858.5 10854.5 10850.5 10846.5 10842.5 10839.5 10840.0 10838.5 10830.5 10827.5 10828.0 10826.5 10823.5 10823.5 10822.5 10819.5 10820.0 10816.0 10816.5 10807.5 10808.0 10806.5 10803.5 10803.5 10802.5 10790.0 10790.0 10786.5 10782.5 10776.5 10776.5 10775.5 10774.5 10766.5 10762.5 10758.5 10754.5 10751.5 10751.5 10747.5 10748.0 10747.0 10742.5 10738.5 10730.5 10726.5 10722.5 10715.5 10716.0 10714.5 10711.5 10711.5 10910.5 10906.0 10898.0 10894.5 10890.0 10885.5 10882.0 10878.0 10874.5 10870.5 10866.0 10862.0 10858.5 10854.5 10850.0 10846.0 10843.0 10838.5 10830.5 10826.0 10823.0 10807.0 10802.5 10786.5 10782.0 10766.0 10763,5 10760.0 10755.0 10752.0 10747.0 10743.0 10739.5 10731.5 10728.0 10723.5 10715.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 18 10710.5 10712.0 10706.5 10707.0 10702.5 10704.0 10699.5 10699.5 10698.5 10700.0 10695.5 10696.0 10694.5 10695.5 10691.5 10692.0 10690.5 10689.5 10687.5 10688.5 10686.5 10685.5 10683.5 10684.5 10682.5 10682.0 10679.5 10680.0 10678.5 10679.5 10672.5 10672.5 10670.5 10671.5 10666.5 10668.0 10662.5 10663.5 10658.5 10659.5 10655.5 10656.0 10654.5 10655.0 10650.5 10650.5 10646.5 10646.5 10643.5 10644.0 10642.5 10643.0 10639.5 10640.5 10638.5 10639.5 10635.5 10636.0 10634.5 10636.0 10630.5 10631,5 10626.5 10626.5 10622.5 10622.5 10618.5 10619.0 10603.5 10604.0 10599.5 10599.5 10598.5 10599.0 10594.5 10595.5 10591.5 10591.5 10590.5 10591.5 10587.5 10587.0 10586.5 10587.0 10582.5 10582.5 10575.0 10574.0 10574.5 10574.5 10570.5 10570,0 10566.5 10565.5 10563.5 10563.0 10562.5 10562.0 10559.5 10558.5 10558.5 10557.5 10555.5 10555.0 10554.5 10553.5 10550.5 10550.0 10548.5 10548.0 LIS Tape Verification Listing Schlumoerger Alaska Computing Center 12-FEB-1996 11:09 10546.5 10546.0 10542.5 10541.5 10538.5 10537.0 10526.5 10525.0 10522.5 10521.5 10518.5 10518.5 10514.5 10513.0 10511.5 10510.5 10510.5 10510.0 10504.5 10503.5 10502.5 10501.5 10498.5 10497.5 100.0 99.0 99.0 $ REMARKS: This file contains TDTP Pass #3(Base pass #3). The depth shifts shown above relect GRCH pass #3 to GRCH  ass #1 and SIGM pass #3 to SIGM pass #1. LIS FORMAT DATA PAGE: 19 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing EGL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth - Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed near detector (TDTP) TCAF Total counts analyzed far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude PAGE: 20 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumoerger Alaska Computing Center 12-FEB-1996 11:09 PAGE: ** SET TYPE - CHAN ** SIGM TDTP CU 100243 O0 000 O0 0 3 I i 4 68 0000000000 TPHI TDTP PU-S 100243 O0 000 O0 0 3 1 I 4 68 0000000000 SBHF TDTP CU 100243 O0 000 O0 0 3 i i 4 68 0000000000 SBHN TDTP CU 100243 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC TDTP CU 100243 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH TDTP CU 100243 O0 000 O0 0 3 I I 4 68 0000000000 TRAT TDTP 100243 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI TDTP CU 100243 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 100243 O0 000 O0 0 3 I 1 4 68 0000000000 FBAC TDTP CPS 100243 O0 000 O0 0 3 i i 4 68 0000000000 TCAN TDTP CPS 100243 O0 000 O0 0 3 1 1 4 68 0000000000 TCAF TDTP CPS 100243 O0 000 O0 0 3 1 1 4 68 0000000000 TCND TDTP CPS 100243 O0 000 O0 0 3 i i 4 68 0000000000 TCFD TDTP CPS 100243 O0 000 O0 0 3 1 i 4 68 0000000000 TSCN TDTP CPS 100243 O0 000 O0 0 3 i 1 4 68 0000000000 TSCF TDTP CPS 100243 O0 000 O0 0 3 i i 4 68 0000000000 INND TDTP CPS 100243 O0 000 O0 0 3 1 I 4 68 0000000000 INFD TDTP CPS 100243 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH TDTP GAPI 100243 O0 000 O0 0 3 i i 4 68 0000000000 TENS TDTP LB 100243 O0 000 O0 0 3 1 I 4 68 0000000000 eCL TDTP V 100243 O0 000 O0 0 3 I 1 4 68 0000000000 21 ** DATA ** DEPT. 11166.500 SIGM.TDTP 29.282 TPHI.TDTP 39.062 SBHF.TDTP SBHN.TDTP 49.724 SIG¢.TDTP 1.805 SIBH.TDTP 70.744 TRAT.TDTP SDSI.TDTP 0.755 BACK.TDTP 222.806 FBAC.TDTP 74.976 TCAN.TDTP TCAF.TDTP 8150.314 TCND.TDTP 18272.918 TCFD.TDTP 5061.578 TSCN.TDTP TSCF.TDTP 1025.396 INND.TDTP 1884.098 INFD.TDTP 294.547 GRCH.TDTP TENS.TDTP 1610.000 CCL.TDTP 0.000 DEPT. 10493.000 SIGM.TDTP 31.598 TPHI.TDTP 70.766 SBHF.TDTP SBHN.TDTP 56.127 SIGC.TDTP 0.375 SIBH.TDTP 89.277 TRAT.TDTP SDSI.TDTP 1.001 BACK.TDTP 202.121 FBA¢.TDTP 45.001 TCAN.TDTP TCAF.TDTP 5731.466 TCND.TDTP 17733.906 TCFD.TDTP 4111.616 TSCN.TDTP TSCF.TDTP 732.804 INND.TDTP 1996.163 INFD.TDTP 340.843 GRCH.TDTP TENS.TDTP 1545.000 CCL.TDTP 0.000 45.816 1.682 24670.719 2846.864 -999.250 50.664 2.225 22306.230 2689.157 122.375 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 22 **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER FILE NAME : EDIT .004 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH .......... .... TDTP 11170.0 10894.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: I .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP 11166.5 11164.0 11161.5 11158.0 11160.5 11158.5 11157.5 11154.0 11155.5 11152.5 11151.0 11147.0 11150.5 11147.0 11148.0 11144.0 11143.0 11139.0 11141.0 11138.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 23 11136.0 11134.5 11134.0 11131.5 11131.0 11129.5 11129.0 11126.5 11126.5 11124.5 11124.5 11121.0 11118.5 11117.5 11115.0 11116.5 11]]5.5 11112.5 11111.5 11106.5 11105.5 11092.0 11091.0 11080.5 11079.5 11072.0 11070.5 11072.0 11063.0 11062.5 11062.5 11062.0 11057.0 11056.5 11056.5 11056.5 11042.5 11042.5 11039.5 11039.5 11039.0 11023.0 11022.5 11022.5 11022.5 11017.5 11018.0 11010.5 11010.5 11009.0 11009.5 11005.5 11005.5 10996.5 10996.0 10989.0 10988.0 10984.5 10983.5 10982.0 10967.0 10965.5 10966.5 10966.0 10958.5 10958.0 10943.0 10943.0 10934.0 10933.0 10933.5 10933.5 10924.5 10924.5 10914.0 10913.5 10912.5 10913.0 10910.0 10909.5 10906.5 10907.0 ]0904.5 10904.5 10904.0 10904.5 10900.5 10901.0 100.0 100.5 100.5 $ REMARKS: This file contains Borax pass #1 of the TDTP. The depth correction shown above reflect Borax pass #1GRCH to base pass #1GRCH and Borax pass #1 SIGMA to base pass #1 SIGMA. All other TDTP curves were carried with the SIGMA shifts. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 24 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing EGL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth Logger BLI FT 11170. Bottom Loq Interval TLI FT 10496. Top Log I~terval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT SIGH TPHI SBHF SBHN SIGC SIBH TRAT SDSI BACK FBAC TCAN TCAF TCND TCFD TSCN TSCF INND INFD Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector Background Count Rate - Far Detector Total counts analyzed - near detector (TDTP) Total counts analyzed - far detector (TDTP) Total capture counts - Near detector Total capture Counts - far dectector Total Selected Counts - Near Detector Total Selected Counts - Far Detector Inelastic count rate - near detector Inelastic count rate - far detector LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TSCF TDTP CPS 100243 O0 000 O0 0 4 1 I 4 --~- 0000000000 INND TDTP CPS 100243 O0 000 O0 0 4 1 1 4 68 0000000000 INFD TDTP CPS 100243 O0 000 O0 0 4 1 I 4 68 0000000000 GRCH TDTP GAPI 100243 O0 000 O0 0 4 i I 4 68 0000000000 TENS TDTP LB 100243 O0 000 O0 0 4 i 1 4 68 0000000000 CCL TDTP V 100243 O0 000 O0 0 4 I i 4 68 0000000000 26 DATA ** DEPT. 11167.500 SIGM.TDTP 28.323 TPHI.TDTP 37.419 SBHF.TDTP SBHN.TDTP 52.385 SIGC.TDTP 1.865 SIBH.TDTP 78.447 TRAT.TDTP SDSI.TDTP 0.923 BACK.TDTP 235.010 FBAC.TDTP 69.329 TCAN.TDTP TCAF.TDTP 6492.437 TCND.TDTP 19040.273 TCFD.TDTP 5321.134 TSCN.TDTP TSCF.TDTP 1117.678 INND.TDTP 1978.752 INFD.TDTP 305.153 GRCH.TDTP TENS.TDTP 1715.000 CCL.TDTP 0.000 DEPT. 10894.500 SIGM.TDTP 10.890 TPHI.TDTP 12.305 SBHF.TDTP SBHN.TDTP 83.306 SIGC.TDTP 0.053 SIBH.TDTP 126.872 TRAT.TDTP SDSI.TDTP 0.187 BACK.TDTP 187.185 FBAC.TDTP 43.474 TCAN.TDTP TCAF.TDTP 30013.250 TCND.TDTP 22208.727 TCFD.TDTP 11611.926 TSCN.TDTP TSCF.TDTP 6264.425 INND.TDTP 1996.521 INFD.TDTP 475.735 GRCH.TDTP TENS.TDTP 1695.000 CCL.TDTP 0.000 40.910 1.644 19009.047 3000.896 -999.250 58.247 1.328 48104.516 10040.471 26.109 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 96/02/12 HAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 27 FILE HEADER FILE NUMBER: 5 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11168.0 10894.0 TDTP 11170.0 10894.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP 88888.0 88884.5 88884.5 11157.5 11154.0 11156.0 11152.5 11150.5 11147.0 11147.0 11148.5 11144.5 11131.5 11129.5 11129.0 11126.5 11126.5 11124.5 11124.5 11117.0 11115.0 11115.5 11109.5 11108.0 11107.5 11105.5 11101.0 11101.0 11091.5 11091.5 11085.0 11084.5 11082.0 11082.0 11076.5 11075.0 11075.0 11075.5 11073.0 11072.0 11072.5 11072.5 11065.0 11064.0 11063.5 11063.5 11061.5 11060.0 11058.0 11056.5 11056.5 11056.5 11042.5 11042.5 11042.0 11041.5 11040.0 11039.5 11039.5 11039.0 11033.0 11032.5 11025.5 11025.0 11023.0 11022.5 11022.5 11012.5 11013.0 11011.0 11010.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 10992.5 10990.0 10989.5 10988.0 10985.0 10983.5 10984.5 10981.5 10967.5 10965.5 10967.0 10966.0 10960.0 10958.5 10955.0 10954.0 10953.5 10943.5 10943.0 10934.5 10933.0 10934.0 10933.5 10924.0 10924.0 10920.0 10919.5 10914.5 10913.5 10913.5 10913.5 10910.5 10909.5 10905.0 10904.5 10904.5 10904.0 100.0 99.5 99.5 $ REMARKS: This file contains Borax pass #2 of the TDTP. Tile depth correction shown above reflect Borax pass #2 GRCH to base pass #1GRCH and Borax pass #2 SIGMA to base pass #1 SIGMA. All other TDTP curves were carried with the SIGMA shifts. $ LIS FORMAT DATA PAGE: 28 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name Field Name FN WN APIN FL SECT TOWN RANG COUN STAT NATI WITN SON PDAT EPD LMF APD EKB EGL TDD FT FT FT FT FT PRUDHOE BAY DS 15-34 500292247400 1428 FNL & 0945 FWL 22 11N 14E NORTH SLOPE ALASKA USA J. HUPP 100243 MSL O. KB 65.5 65.5 30.6 11310. Well Name API Serial Number Field Location Section Township Range County State or Province Nation Witness Name Service Order Number Permanent datum Elevation of Permanent Datum Log Measured From Above Permanent Datum Elevation of Kelly Bushing Elevation of Ground Level Total Depth - Driller LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 29 TUNI VALU DEFI TDL FT 11177. Total Depth - Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed near detector (TDTP) TCAF Total counts analyzed far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 30 TYPE REPR ~;;~' VALUE 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 I ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~--~-'~---~6~--- ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100243 O0 000 O0 0 5 I I 4 68 -6666666666-- SIGM TDTP CU 100243 O0 000 O0 0 5 1 i 4 68 0000000000 TPHI TDTP PU-S 100243 O0 000 O0 0 5 1 I 4 68 0000000000 SBHF TDTP CU 100243 O0 000 O0 0 5 1 1 4 68 0000000000 SBHN TDTP CU 100243 O0 000 O0 0 5 1 1 4 68 0000000000 SIGC TDTP CU 100243 O0 000 O0 0 5 1 1 4 68 0000000000 SIBH TDTP CU 100243 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT TDTP 100243 O0 000 O0 0 5 i 1 4 68 0000000000 SDSI TDTP CU 100243 O0 000 O0 0 5 i 1 4 68 0000000000 BACK TDTP CPS 100243 O0 000 O0 0 5 1 1 4 68 0000000000 FBAC TDTP CPS 100243 O0 000 O0 0 5 1 1 4 68 0000000000 TCAN TDTP CPS 100243 O0 000 O0 0 5 i i 4 68 OOO0000000 TCAF TDTP CPS 100243 O0 000 O0 0 5 I 1 4 68 O0000000gO' TCND TDTP CPS 100243 O0 000 O0 0 5 1 i 4 68 0000000000 TCFD TDTP CPS 100243 O0 000 O0 0 5 I i 4 68 0000000000 TSCN TDTP CPS 100243 O0 000 O0 0 5 I i 4 68 0000000000 TSCF TDTP CPS 100243 O0 000 O0 0 5 i 1 4 68 0000000000 INND TDTP CPS 100243 O0 000 O0 0 5 i I 4 68 0000000000 INFD TDTP CPS 100243 O0 000 O0 0 5 I i 4 68 0000000000 GRCH TDTP GAPI 100243 O0 000 O0 0 5 I i 4 68 0000000000 TENS TDTP LB 100243 O0 000 O0 0 5 1 1 4 68 0000000000 CCL TDTP V 100243 O0 000 O0 0 5 I 1 4 68 0000000000 ** DATA ** DEPT. 11166,500 SIGM.TDTP 28,041 TPHI.TDTP 37,392 SBHF.TDTP SBHN.TDTP 49.399 SIGC.TDTP 2.305 SIBH.TDTP 69.804 TRAT,TDTP SDSI,TDTP 0,969 BACK.TDTP 285,989 FBAC.TDTP 67,920 TCAN.TDTP TCAF.TDTP 8824.457 TCND.TDTP 18987.609 TCFD.TDTP 5316.899 TSCN.TDTP TSCF.TDTP 1086.710 INND.TDTP 2219.306 INFD.TDTP 313.024 GRCH.TDTP TENS.TDTP 1665.000 CCL.TDTP 0,000 43,541 1.683 26568.898 2984.178 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 DEPT. 10893.500 SIGM.TDTP 11.054 TPHI.TDTP 12.489 SBHN.TDTP 78.146 SIGC.TDTP 0.059 SIBH.TDTP 117.008 SDSI.TDTP 0.172 BACK.TDTP 209.534 FBAC.TDTP 43.004 TCAF.TDTP 31333.801 TCND.TDTP 23370.297 TCFD.TDTP 12119.441 TSCF.TDTP 6563.418 INND.TDTP 2135.288 INFD.TDTP 453.309 TENS.TDTP 1680.000 CCL.TDTP 0.000 ** END OF DATA ** SBHF.TDTP TRAT.TDTP TCAN.TDTP TSCN.TDTP GRCH.TDTP PAGE: 31 60.168 1.333 50398.133 10556.779 32.781 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX RE¢ SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 6 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 11168.0 10896.0 TDTP 11170.0 10896.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP LIS Tape Verification Listing Schlumoerger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 32 88888.0 88884.5 88884.5 11158.0 11154.5 11154.5 11151.0 11151.0 11147.5 11150.5 11147.0 11148.5 11144.5 11143.5 11139.5 11143.0 11141.0 11134.0 11131.5 11131.5 11129.5 11129.0 11126.5 11126.5 11124.5 11120.5 11118.5 11117.0 11115.0 11116.5 11115.0 11112.5 11111.0 11107.0 11105.5 11092.5 11091.5 11085.0 11084.5 11080.0 11080.0 11075.0 11075.5 11073.5 11072.0 11072.0 11072.0 11068.0 11067.5 11063.5 11063.5 11062.0 11062.0 11056.5 11056.0 11056.0 11042.5 11042.0 11023.0 11022.5 11016.0 11016.5 11011.0 11010.5 11006.0 11006.0 10993.0 10990.0 10988.0 10988.0 10985.0 10982.0 10977.5 10975.5 10967.0 10965.5 10966.5 10966.0 10964.0 10963.0 10959.0 10958.0 10955.0 10954.0 10947.0 10946.5 10934.5 10933.0 10934.0 10933.5 10920.5 10920.5 10914.0 10913.5 10913.5 10913.5 10905.0 10904.5 10904.0 10904.0 10902.0 10902.0 100.0 100.0 100.0 $ REMARKS: This file contains Borax pass #3 of the TDTP. The depth LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 correction shown above reflect Borax pass #3 GRCH to base pass #1GRCH and Borax pass #3 SIGMA to base pass #1 SIGMA. All other TDTP curves were carried with the SIGMA shifts. $ LIS FORMAT DATA PAGE: 33 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing EGL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth - Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRAT SDSI BACK Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector LIS Tape Verification Listing Schlumoerger Alaska Computing Center 12-FEB-1996 11:09 DEFI FBAC Background Count Rate - Far Detector TCAN Total counts analyzed near detector (TDTP) TCAF Total counts analyzed far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TStN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude PAGE: 34 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ~-¥~ ~[~ co~ --~[~- 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ................................................... ~~--- 0~ ~ ~0~ ~ c~^ss ~o~ ~u~ s^~ ~ co~ (,~x) DEPT FT 100243 O0 000 O0 0 6 I I 4 68 0000000000 SIGM TDTP CU 100243 O0 000 O0 0 6 I 1 4 68 0000000000 TPHI TDTP PU-S 100243 O0 000 O0 0 6 i I 4 68 0000000000 SBHF TDTP CU 100243 O0 000 O0 0 6 1 1 4 68 0000000000 SBHN TDTP tU 100243 O0 000 O0 0 6 i 1 4 68 0000000000 SIGC TDTP CU 100243 O0 000 O0 0 6 i I 4 68 0000000000 SIBH TDTP CU 100243 O0 000 O0 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 35 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR--~~--- ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TRAT TDTP 100243 O0 000 O0 0 6 I i 4 68 0000000000 SDSI TDTP CU 100243 O0 000 O0 0 6 I 1 4 68 0000000000 BACK TDTP CPS 100243 O0 000 O0 0 6 I 1 4 68 0000000000 FBAC TDTP CPS 100243 O0 000 O0 0 6 1 1 4 68 0000000000 TCAN TDTP CPS 100243 O0 000 O0 0 6 1 i 4 68 0000000000 TCAF TDTP CPS 100243 O0 000 O0 0 6 i I 4 68 0000000000 TCND TDTP CPS 100243 O0 000 O0 0 6 1 1 4 68 0000000000 TCFD TDTP CPS 100243 O0 000 O0 0 6 1 i 4 68 0000000000 TSCN TDTP CPS 100243 O0 000 O0 0 6 i I 4 68 0000000000 TSCF TDTP CPS 100243 O0 000 O0 0 6 I i 4 68 0000000000 INND TDTP CPS 100243 O0 000 O0 0 6 1 i 4 68 0000000000 INFD TDTP CPS 100243 O0 000 O0 0 6 1 1 4 68 0000000000 GRCH TDTP GAPI 100243 O0 000 O0 0 6 1 1 4 68 0000000000 TENS TDTP LB 100243 O0 000 O0 0 6 1 1 4 68 0000000000 CCL TDTP V 100243 O0 000 O0 0 6 I i 4 68 0000000000 ** DATA ** DEPT. 11166.500 SIGM.TDTP 28.715 TPHI.TDTP 40.906 SBHF.TDTP SBHN.TDTP 50.040 SIGC.TDTP 1.340 SIBH.TDTP 71.660 TRAT.TDTP SDSI.TDTP 0.698 BACK.TDTP 250.927 FBAC.TDTP 83.445 TCAN.TDTP TCAF.TDTP 8611.129 TCND.TDTP 19475.000 TCFD.TDTP 5351.848 TSCN.TDTP TSCF.TDTP 1129.541 INND.TDTP 1905.192 INFD.TDTP 299.485 GRCH.TDTP TENS.TDTP 1645.000 CCL.TDTP 0.000 DEPT. 10896.000 SIGM.TDTP 10.962 TPHI.TDTP 12.476 SBHF.TDTP SBHN.TDTP 41.175 SIGC.TDTP 0.502 SIBH.TDTP 43.711 TRAT.TDTP SDSI.TDTP 0.183 BACK.TDTP 224.817 FBAC.TDTP 47.234 TCAN.TDTP TCAF.TDTP 36937.422 TCND.TDTP 33691.531 TCFD.TDTP 15394.902 TSCN.TDTP TSCF.TDTP 7764.908 INND.TDTP 1852.268 INFD.TDTP 471.587 GRCH.TDTP TENS.TDTP 1570.000 CCL.TDTP 0.000 42.525 1.737 25952.500 3195.062 -999.250 30.894 1.418 64207.578 13497.582 42.094 END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 12-FEB-1996 11:09 PAGE: 36 FILE HEADER FILE NUMBER: 7 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass I Gamma Ray and backround counts~ arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS TDTP 1, 2, 3, $ REMARKS: The arithmetic average of BASE passes 1,2 & 3 was computed after all depth shifts and clipping was applied. $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name Field Name FN PRUDHOE BAY WN DS 15-34 APIN 500292247400 FL 1428 FNL & 0945 FWL SECT 22 TOWN 11N RANG 14E COUN NORTH SLOPE STAT ALASKA NATI USA WITN J. HUPP SON 100243 PDAT MSL EPD FT O. LMF KB APD FT 65.5 EKB FT 65.5 EGL FT 30.6 Well Name API Serial Number Field Location Section Township Range County State or Province Nation Witness Name Service Order Number Permanent datum Elevation of Permanent Datum Log Measured From Above Permanent Datum Elevation of Kelly Bushing Elevation of Ground Level LIS Tape Verification Listing Schlumberger Alaska Computin~ Center 12-FEB-1996 11:09 PAGE: 37 TUNI VALU DEFI .... ............................. ......................... .......... TDL FT 11177. Total Depth - Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT Depth SIGH Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed near detector (TDTP) TCAF Total counts analyzed far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector GRCH Gamma Ray in Casing DATA FORHAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 38 TYPE REPR CODE VALUE 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE(HEX) oo ooo oo o -6666666666-- SIGH PNAV CU 100243 O0 000 O0 0 7 I I 4 68 0000000000 TPHI PNAV PU-S 100243 O0 000 O0 0 7 1 1 4 68 0000000000 SBHF PNAV CU 100243 O0 000 O0 0 7 1 1 4 68 0000000000 SBHN PNAV CU 100243 O0 000 O0 0 7 I i 4 68 0000000000 SIGC PNAV CU 100243 O0 000 O0 0 7 1 1 4 68 0000000000 SIBH PNAV CU 100243 O0 000 O0 0 7 1 1 4 68 0000000000 TRAT PNAV 100243 O0 000 O0 0 7 I 1 4 68 0000000000 SDSI PNAV CU 100243 O0 000 O0 0 7 1 i 4 68 0000000000 BACK TDTP CPS 100243 O0 000 O0 0 7 i i 4 68 0000000000 FBAC TDTP CPS 100243 O0 000 O0 0 7 1 I 4 68 0000000000 TCAN PNAV CPS 100243 O0 000 O0 0 7 1 i 4 68 0000000000 TCAF PNAV CPS 100243 O0 000 O0 0 7 i I 4 68 0000000000 TCND PNAV CPS 100243 O0 000 O0 0 7 i 1 4 68 0000000000 TCFD PNAV CPS 100243 O0 000 O0 0 7 I I 4 68 0000000000 TSCN PNAV CPS 100243 O0 000 O0 0 7 i I 4 68 0000000000 TSCF PNAV CPS 100243 O0 000 O0 0 7 1 i 4 68 0000000000 INND PNAV CPS 100243 O0 000 O0 0 7 I 1 4 68 0000000000 INFD PNAV CPS 100243 O0 000 O0 0 7 1 1 4 68 0000000000 GRCH TDTP GAPI 100243 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 11167.000 SIGM.PNAV -999.250 TPHI.PNAV -999.250 SBHF.PNAV SBHN.PNAV -999.250 SIGC.PNAV -999.250 SIBH.PNAV -999.250 TRAT.PNAV SDSI.PNAV -999.250 BACK.TDTP 117.376 FBAC.TDTP 120.815 TCAN.PNAV TCAF. PNAV -999.250 TCND.PNAV -999.250 TCFD.PNAV -999.250 TSCN.PNAV TSCF. PNAV -999.250 INND.PNAV -999.250 INFD.PNAV -999.250 GRCH.TDTP DEPT. 10495.000 SIGM.PNAV 26.962 TPHI.PNAV 43.066 SBHF.PNAV SBHN.PNAV 53.695 SIGC.PNAV 1.634 SIBH.PNAV 81.695 TRAT.PNAV SDSI.PNAV 1.203 BACK.TDTP 132.694 FBAC.TDTP 33.139 TCAN.PNAV TCAF.PNAV 4306.932 TCND.PNAV 18124.938 TCFD.PNAV 4713.614 TSCN.PNAV TSCF. PNAV 908.365 INND.PNAV 2014.460 INFD.PNAV 327.788 GRCH.TDTP -999.250 -999.250 -999.250 -999.250 -999.250 47.229 1.813 12898.746 2720.346 53.500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 39 END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : 001¢01 DATE : 96/02/12 HAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH TDTP 11170.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (Fl): LOGGING SPEED (FPHR~: DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE STOP DEPTH 10494.0 4-DEC-95 CP 40.2 1345 04-DEC-95 11310.0 11177.0 10496.0 11170.0 1800.0 NO TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska-Computing Center 12-FEB-1996 11:09 PAGE: 40 TDTP COLLAR TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERHAL DECAY $ CALU TNC P 141 TND P 75 TNG P 236 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH.(FT): LOGGERS CASING DEPTH (FT): 11310.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEC): DEAD CRUDE/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (F.T): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (CPS)~ 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REMARKS: TIED INTO CNL DATED 16-MAY-1994. PURPOSE: TO VERIFY GOC AND TO DETERMINE SOURCE OF HIGH GOR. (POSSIBLE CHANNEL) PROCEDURE: 1. PUMPED 280 BBLS DEAD CRUDE AT 5 BPM INTO WELL SLOWED INJ. RATE TO i BPM AND LOGGED BASELINE PASS 1 FROM 11177' TO 10500'. 2. LOGGED BASELINE PASS 2 AFTER 280 BBLS CRUDE AND 20 BBLS OF BORAX WERE PUMPED, STILL AT 1BPM AT 370 PSI. 3. LOGGED BASELINE PASS 3 AFTER 280 BBLS CRUDE AND 50 BBLS BORAX WERE PUMPED. 4. INCREASE INJ. TO 5 BPM AND PUMP TOTAL OF 100 BBLS BORAX FOLLOWED BY CRUDE SPACER. 5. AFTER 115 BBLS CRUDE SPACER SLOW INJ. TO 1.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 BPM AND LOG BORAX PASS 1. 30 BBLS BORAX IN FM. 6. AFTER 145 BBLS CRUDE SPACER LOG BORAX PASS 2 (60 BBLS BORAX IN FH) 7. AFTER 170 BBLS CURDE SPACER LOG BORAX PASS 3 RESULTS: NO CHANNEL SEEN. APPARENT GOC AT 11080' $ LIS FORMAT DATA PAGE: 41 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALAS~ INC. Company Name FN PRUDHOE BAY Field Name WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing EGL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRAT SDSI Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma LIS Tal~e Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 DEFI BACK Background Count Rates - Near Detector FBAC Backqround Count Rate - Far Detector TCAN Total counts analyzed - near detector.(TDT?) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude PAGE: 42 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** c0o 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 i ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100243 O0 000 O0 0 8 i 1 4 68 0000000000 SIGM PS1 CU 100243 O0 000 O0 0 8 i 1 4 68 0000000000 TPHI PS1 PU 100243 O0 000 O0 0 8 1 i 4 68 0000000000 SBHF PS1 CU 100243 O0 000 O0 0 8 i i 4 68 0000000000 SBHN PS1 CU 100243 O0 000 O0 0 8 1 1 4 68 0000000000 SIGC PS1 CU 100243 O0 000 O0 0 8 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 43 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) cu ooooo ooo TRAT PS1 100243 O0 000 O0 0 8 1 I 4 68 0000000000 SDSI PS1 CU 100243 O0 000 O0 0 8 1 I 4 68 0000000000 BACK PS1 CPS 100243 O0 000 O0 0 8 1 1 4 68 0000000000 FBAC PS1 CPS 100243 O0 000 O0 0 8 I 1 4 68 0000000000 TCAN PS1 CPS 100243 O0 000 O0 0 8 1 1 4 68 0000000000 TCAF PS1 CPS 100243 O0 000 O0 0 8 1 1 4 68 0000000000 TCND PS1 CPS 100243 O0 000 O0 0 8 1 i 4 68 0000000000 TCFD PS1 CPS 100243 O0 000 O0 0 8 1 1 4 68 0000000000 TSCN PS1 CPS 100243 O0 000 O0 0 8 1 1 4 68 0000000000 TSCF PS1 CPS 100243 O0 000 O0 0 8 1 1 4 68 0000000000 INND PS1 CPS 100243 O0 000 O0 0 8 i 1 4 68 0000000000 INFD PS1 CPS 100243 O0 000 O0 0 8 1 1 4 68 0000000000 TENS PS1 LB 100243 O0 000 O0 0 8 1 i 4 68 0000000000 GR PS1 GAPI 100243 O0 000 O0 0 8 1 1 4 68 0000000000 CCL PS1 V 100243 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 11189.500 SIGM.PS1 27.993 TPHI.PS1 35.543 SBHF.PS1 SBHN.PS1 50.768 SIGC.PS1 1.981 SIBH.PS1 73.765 TRAT.PS1 SDSI.PS1 0.574 BACK. PS1 85.477 FBAC.PS1 19.053 TCAN.PS1 TCAF. PS1 8574.828 TCND.PS1 19017.598 TCFD.PS1 5325.396 TSCN.PS1 TSCF. PS1 1106.704 INND.PS1 2060.010 INFD.PS1 309.291 TENS.PS1 GR. PS1 67.313 CCL.PS1 0.000 DEPT. 10470.000 SIGM.PS1 35.453 TPHI.PS1 75.523 SBHF.PS1 SBHN.PS1 59.696 SIGC.PS1 1.472 SIBH.PS1 99.606 TRAT.PS1 SDSI.PS1 0.904 BACK. PS1 125.301 FBA¢.PS1 29.734 TCAN.PS1 TCAF.PS1 4525.142 TCND.PS1 17042.949 TCFD.PS1 3758.897 TSCN.PS1 TSCF.PS1 512.193 INND.PS1 2134.428 INFD.PS1 334.735 TENS.PS1 GR.PS1 42.625 CCL. PS1 0.000 43.834 1.625 24998.523 2922.883 1115.000 50.950 2.150 19136.672 2035.551 1430.000 END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumoerger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 44 **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 9 RAW CURVES Curves and log header data for each pass in separate files~ raw background pass in last file 2 0.5000 PASS NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE TDTP $ LOG HEADER DATA DATE LOGGED: START DEPTH STOP DEPTH 11170.0 10494.0 SOFTWARE VERSION: TIHE LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR~: . . DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TDTP COLLAR TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH~Fs): LOGGERS CASING DEPTH (FTC: BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEG,): BOTTOM HOLE TEMPERATURE (DEGF): 4-DEC-95 CP 40.2 1345 04-DEC-95 11310.0 11177.0 10496.0 11170.0 1800.0 NO TOOL NUMBER CALU TNC P 141 TND P 75 TNG P 236 11310.0 DEAD CRUDE/BORAX LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEC): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (~PS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (~PS)~ 0 NEAR COUNT RATE HIGH SCALE (CPSC: 30000 TOOL STANDOFF (IN): 1.0 REMARKS: TIED INTO CNL DATED 16-MAY-1994. PURPOSE: TO VERIFY GOC AND TO DETERMINE SOURCE OF HIGH GOR. (POSSIBLE CHANNEL) PROCEDURE: 1. PUMPED 280 BBLS DEAD CRUDE AT 5 BPM INTO WELL SLOWED INJ. RATE TO 1BPM AND LOGGED BASELINE PASS 1 FROM 11177' TO 10500'. 2. LOGGED BASELINE PASS 2 AFTER 280 BBLS CRUDE AND 20 BBLS OF BORAX WERE PUMPED, STILL AT 1BPM AT 370 PSI. 3. LOGGED BASELINE PASS 3 AFTER 280 BBLS CRUDE AND 50 BBLS BORAX WERE PUMPED. 4. INCREASE INJ. TO 5 BPM AND PUMP TOTAL OF 100 BBLS BORAX FOLLOWED BY CRUDE SPACER. 5. AFTER 115 BBLS CRUDE SPACER SLOW INJ. TO 1.5 BPM AND LOG BORAX PASS 1. 30 BBLS BORAX IN FM. 6. AFTER 145 BBLS CRUDE SPACER LOG BORAX PASS 2 (60 BBLS BORAX IN FM) 7. AFTER 170 BBLS CURDE SPACER LOG BORAX PASS 3 RESULTS: NO CHANNEL SEEN. APPARENT GOC AT 11080' $ LIS FORMAT DATA PAGE: 45 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 46 TUNI VALU DEFI WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing EGL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth - Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT Depth . SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN TotaI counts analyzed near detector (TDTP) TCAF Total counts analyzed far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector TENS Surface Tension GR API-Corrected Gamma Ray CCL eCL Amplitude LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 47 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** ..... ..... i 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROC~--- ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) oo ooo oo o 9 ..... ..... .... SIGM PS2 CU 100243 O0 000 O0 0 9 i i 4 68 0000000000 TPHI PS2 PU 100243 O0 000 O0 0 9 1 I 4 68 0000000000 SBHF PS2 CU 100243 O0 000 O0 0 9 1 1 4 68 0000000000 SBHN PS2 CU 100243 O0 000 O0 0 9 1 1 4 68 0000000000 SIGC PS2 CU 100243 O0 000 O0 0 9 I 1 4 68 0000000000 SIBH PS2 CU 100243 O0 000 O0 0 9 1 1 4 68 0000000000 TRAT PS2 100243 O0 000 O0 0 9 i i 4 68 0000000000 SDSI PS2 CU 100243 O0 000 O0 0 9 1 1 4 68 0000000000 BACK PS2 CPS 100243 O0 000 O0 0 9 i i 4 68 0000000000 FBAC PS2 CPS 100243 O0 000 O0 0 9 1 i 4 68 0000000000 TCAN PS2 CPS 100243 O0 000 O0 0 9 1 1 4 68 0000000000 TCAF PS2 CPS 100243 O0 000 O0 0 9 1 i 4 68 0000000000 TCND PS2 CPS 100243 O0 000 O0 0 9 I 1 4 68 0000000000 TCFD PS2 CPS 100243 O0 000 O0 0 9 i I 4 68 0000000000 TSCN PS2 CPS 100243 O0 000 O0 0 9 1 1 4 68 0000000000 TSCF PS2 CPS 100243 O0 000 O0 0 9 1 i 4 68 0000000000 INND PS2 CPS 100243 O0 000 O0 0 9 I 1 4 68 0000000000 INFD PS2 CPS 100243 O0 000 O0 0 9 I 1 4 68 0000000000 TENS PS2 LB 100243 O0 000 O0 0 9 1 i 4 68 0000000000 GR PS2 GAPI 100243 O0 000 O0 0 9 I 1 4 68 0000000000 CCL PS2 V 100243 O0 000 O0 0 9 i i 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center ** DATA ** DEPT. 11188.000 SIGM.PS2 SBHN.PS2 59.696 SIGC.PS2 SDSI.PS2 0.904 BACK.PS2 TCAF.PS2 4525.142 TeND.PS2 TSCF.PS2 512.193 INND.PS2 GR.PS2 741.000 CCL.PS2 DEPT. 10471.000 SIGH.PS2 SBHN.PS2 61.391 SIGC.PS2 SDSI.PS2 0.964 BACK. PS2 TCAF. PS2 4210.868 TCND.PS2 TSCF. PS2 481.105 INND.PS2 GR.PS2 47.000 CCL.PS2 ** END OF DATA ** 12-FEB-1996 11:09 35.453 TPHI.PS2 1.472 SIBH.PS2 125.301 FBAC.PS2 17042.949 TCFD.PS2 2134.428 INFD.PS2 0.000 35.027 TPHI.PS2 1.603 SIBH.PS2 174.615 FBAC.PS2 16139.389 TCFD.PS2 2048.565 INFD.PS2 0.000 75.523 SBHF.PS2 99.606 TRAT.PS2 29.734 TCAN.PS2 3758.897 TSCN.PS2 334.735 TENS.PS2 66.875 SBHF.PS2 104.512 TRAT.PS2 43.943 TCAN.PS2 3567.889 TSCN.PS2 355.526 TENS.PS2 PAGE: 48 50.950 2.150 19136.672 2035.551 1070.000 43.763 1.999 16797.512 1773.778 1530.000 **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX RE¢ SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 10 RAW CURVES Curves and log header data PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH TDTP 11170.0 $ for each pass in separate STOP DEPTH 10494.0 files; raw background pass in last file LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 49 # LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR~: . . DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ............ TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN):. DRILLERS CASING DEPTH (FT}: LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEG,): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEC): 4-DEC-95 CP 40.2 1345 04-DEC-95 11310.0 11177.0 10496.0 11170.0 1800.0 NO TOOL NUMBER CALU TNC P 141 TND P 75 TNG P 236 11310.0 DEAD CRUDE/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT)~ BASE NORMALIZING WINDOW (FT}: BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (~PS)~ 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 50 REHARKS: TIED INTO CNL DATED 16-MAY-1994. PURPOSE: TO VERIFY GOC AND TO DETERMINE SOURCE OF HIGH GOR. (POSSIBLE CHANNEL) PROCEDURE: 1. PUMPED 280 BBLS DEAD CRUDE AT 5 BPM INTO WELL SLOWED INJ. RATE TO 1BPM AND LOGGED BASELINE PASS 1 FROM 11177' TO 10500'. 2. LOGGED BASELINE PASS 2 AFTER 280 BBLS CRUDE AND 20 BBLS OF BORAX WERE PUMPED, STILL AT 1BPM AT 370 PSI. 3. LOGGED BASELINE PASS 3 AFTER 280 BBLS CRUDE AND 50 BBLS BORAX WERE PUMPED. 4. INCREASE INJ. TO 5 BPM AND PUMP TOTAL OF 100 BBLS BORAX FOLLOWED BY CRUDE SPACER. 5. AFTER 115 BBLS CRUDE SPACER SLOW INJ. TO 1.5 BPM AND LOG BORAX PASS 1. 30 BBLS BORAX IN FM. 6. AFTER 145 BBLS CRUDE SPACER LOG BORAX PASS 2 (60 BBLS BORAX IN FM) 7. AFTER 170 BBLS CURDE SPACER LOG BORAX PASS 3 RESULTS: NO CHANNEL SEEN. APPARENT GOC AT 11080' $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing EGL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom LIS Tape Verification Listing Schlumberger Alaska Computing Center 12- FEB- 1996 11: 09 TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDT?) TCAF Total counts analyzed - far detector (TDTP} TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude PAGE: 51 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE i 66 2 66 3 73 4 66 5 66 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 VALUE 0 0 88 1 0.5 FT 11 0 FT 68 1 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 52 ** SET TYPE - CHAN ** ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100243 O0 000 O0 O 10 i 1 4 68 ---~~-- cu oo243 oo ooo oo o 4 oooooooooo TPHI PS3 PU 100243 O0 000 O0 0 10 I 1 4 SBHF PS3 CU 100243 O0 000 O0 0 10 i i 4 SBHN PS3 CU 100243 O0 000 O0 0 10 1 i 4 SIGC PS3 CU 100243 O0 000 O0 0 10 1 1 4 SIBH PS3 CU 100243 O0 000 O0 0 10 1 i 4 TRAT PS3 100243 O0 000 O0 0 10 1 1 4 SDSI PS3 CU 100243 O0 000 O0 0 10 1 i 4 BACK PS3 CPS 100243 O0 000 O0 0 10 I I 4 FBAC PS3 CPS 100243 O0 000 O0 0 10 I 1 4 TCAN PS3 CPS 100243 O0 000 O0 0 10 1 1 4 TCAF PS3 CPS 100243 O0 000 O0 0 10 i i 4 TCND PS3 CPS 100243 O0 000 O0 0 10 1 1 4 TCFD PS3 CPS 100243 O0 000 O0 0 10 1 i 4 TSCN PS3 CPS 100243 O0 000 O0 0 10 1 I 4 TSCF PS3 CPS 100243 O0 000 O0 0 10 1 1 4 INND PS3 CPS 100243 O0 000 O0 0 10 i I 4 INFD PS3 CPS 100243 O0 000 00 0 10 i i 4 TENS PS3 LB 100243 O0 000 O0 0 10 I i 4 GR PS3 GAPI 100243 O0 000 O0 0 10 1 i 4 CCL PS3 V 100243 O0 000 O0 0 10 I I 4 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 ** DATA ** DEPT. SBHN.PS3 SDSI.PS3 TCAF. PS3 TSCF. PS3 GR. PS3 11192.500 SIGM.PS3 35.027 TPHI.PS3 61.391 SIGC.PS3 1.603 SIBH.PS3 0.964 BACK. PS3 174.615 FBAC.PS3 4210.868 TCND.PS3 16139.389 TCFD.PS3 481.105 INND.PS3 2048.565 INFD.PS3 433.250 CCL. PS3 0.000 66.875 SBHF.PS3 43.763 104.512 TRAT. PS3 1.999 43.943 TCAN.PS3 16797.512 3567.889 TSCN.PS3 1773.778 355.526 TENS.PS3 1065.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 53 **** FILE HEADER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 11 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH TDTP 11170.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FTC: . BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR~ : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TDTP COLLAR TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH'(F.T): LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEG,): . BOTTOM HOLE TEMPERATURE (DEGF): STOP DEPTH 10494.0 4-DEC-95 CP 40.2 1345 04-DEC-95 11310.0 11177.0 10496.0 11170.0 1800.0 NO TOOL NUMBER CALU TNC P 141 TND P 75 TNG P 236 11310.0 DEAD CRUDE/BORAX LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS)~ 0 FAR COUNT RATE HIGH SCALE (CPSC: 12000 NEAR COUNT RATE LOW SCALE (CPS~ 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REMARKS: TIED INTO CNL DATED 16-MAY-1994. PURPOSE: TO VERIFY GOC AND TO DETERMINE SOURCE OF HIGH GOR. (POSSIBLE CHANNEL) PROCEDURE: 1. PUMPED 280 BBLS DEAD CRUDE AT 5 BPM INTO WELL SLOWED INJ. RATE TO 1BPM AND LOGGED BASELINE PASS 1 FROM 11177' TO 10500'. 2. LOGGED BASELINE PASS 2 AFTER 280 BBLS 20 BBLS OF BORAX WERE PUMPED, STILL AT 1 370 PSI. 3. LOGGED BASELINE PASS 3 AFTER 280 BBLS 50 BBLS BORAX WERE PUMPED. 4. INCREASE INJ. TO 5 BPM AND PUMP TOTAL OF 100 BBLS BORAX FOLLOWED BY CRUDE SPACER. 5. AFTER 115 BBLS CRUDE SPACER SLOW INJ. TO 1.5 BPM AND LOG BORAX PASS 1. 30 BBLS BORAX IN FM. 6. AFTER 145 BBLS CRUDE SPACER LOG BORAX PASS 2 (60 BBLS BORAX IN FM) 7. AFTER 170 BBLS CURDE SPACER LOG BORAX PASS 3 RESULTS: NO CHANNEL SEEN. APPARENT GOC AT 11080' $ LIS FORMAT DATA CRUDE AND BPM AT CRUDE AND PAGE: 54 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 55 TUNI VALU DEFI WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing ECL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth - Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Tota! counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 56 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 I ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE -~;~- ~6~--- ]D ORDER # LOG TYPE CLASS MOD NUHB SAMP ELEM CODE (HEX) DEPT FI 100243 O0 000 O0 0 11 I 1 4 68 66b$~6665~-- SIGM BS1 CU 100243 O0 000 O0 0 11 1 1 4 68 0000000000 TPHI BS1 PU 100243 O0 000 O0 0 11 1 1 4 68 0000000000 SBHF BS1 CU 100243 O0 000 O0 0 11 i I 4 68 0000000000 SBHN BS1 CU 100243 O0 000 O0 0 11 1 1 4 68 0000000000 SIGC BS1 CU 100243 O0 000 O0 0 11 1 1 4 68 0000000000 SIBH BS1 CU 100243 O0 000 O0 0 11 1 1 4 68 0000000000 TRAT BS1 100243 O0 000 O0 0 11 1 i 4 68 0000000000 SDSI BS1 CU 100243 O0 000 O0 0 11 i 1 4 68 0000000000 BACK BS1 CPS 100243 O0 000 O0 0 11 1 1 4 68 0000000000 FBAC BS1 CPS 100243 O0 000 O0 0 11 1 1 4 68 0000000000 TCAN BS1 CPS 100243 O0 000 O0 0 11 1 1 4 68 0000000000 TCAF BSi CPS 100243 O0 000 O0 0 11 I I 4 68 0000000000 TCND BS1 CPS 100243 O0 000 O0 0 11 1 1 4 68 0000000000 TCFD BS1 CPS 100243 O0 000 O0 0 11 i i 4 68 0000000000 TSCN BS1 CPS 100243 O0 000 O0 0 11 1 i 4 68 0000000000 TSCF BS1 CPS 100243 O0 000 O0 0 11 1 1 4 68 0000000000 INND BS1 CPS 100243 O0 000 O0 0 11 I I 4 68 0000000000 INFD BS1 CPS 100243 O0 000 O0 0 11 1 1 4 68 0000000000 TENS BS1 LB 100243 O0 000 O0 0 11 I 1 4 68 0000000000 GR BS1 GAPI 100243 O0 000 O0 0 11 1 i 4 68 0000000000 CCL BS1 V 100243 O0 000 O0 0 11 I 1 4 68 0000000000 LIS Tape Verification Listing Schlumoerger Alaska Computing Center ** DATA ** DEPT. 11192.500 SIGM.BS1 SBHN.BS1 81.156 SIGC.BS1 SDSI.BS1 0.662 BACK.BS1 TCAF.BS1 5434.860 TCND.BS1 TSCF.BS1 1811.752 INND.BS1 GR.BS1 277.250 CCL.BS1 DEPT. 10863.500 SIGH.BS1 SBHN.BS1 82.403 SIGC.BS1 SDSI.BS1 0.160 BACK.BS1 TCAF.BS1 28398.336 TCND.BS1 TSCF.BS1 5928.669 INND.BS1 GR.BS1 27.859 CCL.BS1 ** END OF DATA ** 19 0 206 13482 2009 0 11 0 199 22348 2O70 0 12-FEB-1996 11:09 .496 TPHI.BS1 .204 SIBH.BS1 .278 FBA¢.BS1 .547 TCFD.BS1 .653 INFD.BS1 .000 .195 TPHI.BS1 .021 SIBH.BS1 .309 FBAC.BS1 .898 TCFD.BS1 .450 INFD.BS1 .000 24.028 SBHF.BS1 139.074 TRAT.BS1 113.347 TCAN.BS1 5056.761 TSCN.BS1 338.763 TENS.BS1 13.350 SBHF.BS1 127.298 TRAT.BS1 33.608 TCAN.BS1 11162.299 TSCN.BS1 394.540 TENS.BS1 PAGE: 63.896 1.516 11322.551 3774.459 1030.000 54.979 1.369 47212.617 9856.492 1705.000 57 **** FILE TRAILER **** FILE NAME : EDIT .011 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 12 RAW CURVES Curves and log header data for each pass PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH TDTP 11170.0 $ in separate files~ STOP DEPTH 10494.0 raw background pass in last file LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 58 # LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FI): TD LOGGER(FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 4-DEC-95 CP 40.2 1345 04-DEC-95 11310.0 11177.0 10496.0 11170.0 1800.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TDTP COLLAR TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP I'HERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT)~ BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (~PS): 0 FAR COUNT RATE HIGH SCALE (CPS): 12000 NEAR COUNT RATE LOW SCALE (~PS)~ 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 TOOL NUMBER CALL TNC P 141 TND P 75 TNG P 236 11310.0 DEAD CRUDE/BORAX THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 REMARKS: TIED INTO CNL DATED 16-MAY-1994. PURPOSE: TO VERIFY GOC AND TO DETERMINE SOURCE OF HIGH GOR. (POSSIBLE CHANNEL) PROCEDURE: 1. PUMPED 280 BBLS DEAD CRUDE AT 5 BPM INTO WELL SLOWED INJ. RATE TO 1BPM AND LOGGED BASELINE PASS I FROM 11177' TO 10500'. 2. LOGGED BASELINE PASS 2 AFTER 280 BBLS 20 BBLS OF BORAX WERE PUMPED, STILL AT 1 370 PSI. 3. LOGGED BASELINE PASS 3 AFTER 280 BBLS 50 BBLS BORAX WERE PUMPED. 4. INCREASE INJ. TO 5 BPM AND PUMP TOTAL OF 100 BBLS BORAX FOLLOWED BY CRUDE SPACER. 5. AFTER 115 BBLS CRUDE SPACER SLOW INJ. TO 1.5 BPM AND LOG BORAX PASS 1. 30 BBLS BORAX IN FM. 6. AFTER 145 BBLS CRUDE SPACER LOG BORAX PASS 2 (60 BBLS BORAX IN FM) 7. AFTER 170 BBLS CURDE SPACER LOG BORAX PASS 3 RESULTS: NO CHANNEL SEEN. APPARENT GOC AT 11080' $ LIS FORMAT DATA CRUDE AND BPM AT CRUDE AND PAGE: 59 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LHF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing EGL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth - Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 TABLE TYPE : CURV DEFI SIGH Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - wear detector INFD Inelastic count rate - far detector TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude PAGE: 60 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 0 88 1 2 66 3 73 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 I LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: ** SET TYPE - CHAN ** ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100243 O0 000 O0 0 12 1 1 4 -~-- 0000000000 SIGM BS2 CU 100243 O0 000 O0 0 12 I 1 4 68 0000000000 TPHI BS2 PU 100243 O0 000 O0 0 12 I I 4 68 0000000000 SBHF BS2 CU 100243 O0 000 O0 0 12 1 i 4 68 0000000000 SBHN BS2 CU 100243 O0 000 O0 0 12 i 1 4 68 0000000000 SIGC BS2 CU 100243 O0 000 O0 0 12 I i 4 68 0000000000 SIBH BS2 CU 100243 O0 000 O0 0 12 1 I 4 68 0000000000 TRAT BS2 100243 O0 000 O0 0 12 1 1 4 68 0000000000 SDSI BS2 CU 100243 O0 000 O0 0 12 1 I 4 68 0000000000 BACK BS2 CPS 100243 O0 000 O0 0 12 1 i 4 68 0000000000 FBAC BS2 CPS 100243 O0 000 O0 0 12 1 1 4 68 0000000000 TCAN BS2 CPS 100243 O0 000 O0 0 12 I i 4 68 0000000000 TCAF BS2 CPS 100243 O0 000 O0 0 12 1 1 4 68 0000000000 TCND BS2 CPS 100243 O0 000 O0 0 12 1 1 4 68 0000000000 TCFD BS2 CPS 100243 O0 000 O0 0 12 I i 4 68 0000000000 TSCN BS2 CPS 100243 O0 000 O0 0 12 1 1 4 68 0000000000 TSCF BS2 CPS 100243 O0 000 O0 0 12 1 i 4 68 0000000000 INND BS2 CPS 100243 O0 000 O0 0 12 I i 4 68 0000000000 INFD BS2 CPS 100243 O0 000 O0 0 12 1 1 4 68 0000000000 TENS BS2 LB 100243 O0 000 O0 0 12 1 1 4 68 0000000000 GR BS2 GAPI 100243 O0 000 O0 0 12 1 1 4 68 0000000000 CCL BS2 V 100243 O0 000 O0 0 12 I I 4 68 0000000000 61 ** DATA ** DEPT. 11191.000 SIGM,BS2 11.195 TPHI.BS2 13.350 SBHF.BS2 SBHN.BS2 82.403 SIGC.BS2 0.021 SIBH.BS2 127.298 TRAT.BS2 SDSI.BS2 0.160 BACK.BS2 199.309 FBAC.BS2 33.608 TCAN.BS2 TCAF.BS2 28398.336 TCND.BS2 22348.898 TCFD.BS2 11162.299 TSCN.BS2 TSCF.BS2 5928.669 INND,BS2 2070.450 INFD,BS2 394,540 TENS,BS2 GR.BS2 133.500 CCL.BS2 0.000 DEPT. 10857.000 SIGM.BS2 10.510 TPHI.BS2 11.543 SBHF.BS2 SBHN.BS2 82.608 SIGC.BS2 0.123 SIBH.BS2 124.526 TRAT.BS2 SDSI.BS2 0.148 BACK. BS2 188.193 FBAC.BS2 45.235 TCAN.BS2 TCAF.BS2 30419.230 TCND.BS2 22624.309 TCFD.BS2 11852.480 TSCN.BS2 TSCF.BS2 6377.198 INND.BS2 2153.607 INFD.BS2 411.518 TENS.BS2 GR.BS2 27.859 CCL.BS2 0.000 54.979 1.369 47212.617 9856.492 1035.000 55.289 1.302 48053.828 10074.180 1665.000 ** END OF DATA ** LIS Tape Verification Listing Schlumoerger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 62 **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE : FLtC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 13 RAW CURVES Curves and log header data for each pass in separate files~ raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 # FILE SUMMARY VENDOR TOOL CODE START DEPTH TDTP 11170.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: ID DRILLER (Fl): TD LOGGER(FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHRt~ DEPTH CONTROL USED ES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TDTP COLLAR TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY $ STOP DEPTH 10494.0 4-DEC-95 CP 40.2 1345 04-DEC-95 11310.0 11177.0 10496.0 11170.0 1800.0 NO TOOL NUMBER CALU TN¢ P 141 TND P 75 TNG P 236 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 63 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 11310.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) i SURFACE TEMPERATURE (DEG,): . BOTTOM HOLE TEMPERATURE {DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): DEAD CRUDE/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (~PS)~ 0 FAR COUNT RATE HIGH SCALE (CPS/: 12000 NEAR COUNT RATE LOW SCALE (~PS)~ 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REMARKS: TIED INTO CNL DATED 16-MAY-1994. PURPOSE: TO VERIFY GOC AND TO DETERMINE SOURCE OF HIGH GOR. (POSSIBLE CHANNEL) PROCEDURE: 1. PUMPED 280 BBLS DEAD CRUDE AT 5 BPM INTO WELL SLOWED INJ. RATE TO 1BPM AND LOGGED BASELINE PASS I FROM 11177' TO 10500'. 2. LOGGED BASELINE PASS 2 AFTER 280 BBLS CRUDE AND 20 BBLS OF BORAX WERE PUMPED, STILL AT 1BPM AT 370 PSI. 3. LOGGED BASELINE PASS 3 AFTER 280 BBLS CRUDE AND 50 BBLS BORAX WERE PUMPED. 4. INCREASE INJ. TO 5 BPM AND PUMP TOTAL OF 100 BBLS BORAX FOLLOWED BY CRUDE SPACER. 5. AFTER 115 BBLS CRUDE SPACER SLOW INJ. TO 1.5 BPM AND LOG BORAX PASS 1. 30 BBLS BORAX IN FM. 6. AFTER 145 BBLS CRUDE SPACER LOG BORAX PASS 2 (60 BBLS BORAX IN FM) 7. AFTER 170 BBLS CURDE SPACER LOG BORAX PASS 3 RESULTS: NO CHANNEL SEEN. APPARENT GOC AT 11080' $ LIS Tape Verification Listing Schlumoerger Alaska Computing Center # LIS FORMAT DATA 12-FEB-1996 11:09 PAGE: 64 TABLE TYPE :CONS TUNI VALU DEFI CN ARCO ALASKA INC. Company Name FN PRUDHOE BAY Field Name WN DS 15-34 Well Name APIN 500292247400 API Serial Number FL 1428 FNL & 0945 FWL Field Location SECT 22 Section TOWN 11N Township RANG 14E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nation WITN J. HUPP Witness Name SON 100243 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF KB Log Measured From APD FT 65.5 Above Permanent Datum EKB FT 65.5 Elevation of Kelly Bushing ECL FT 30.6 Elevation of Ground Level TDD FT 11310. Total Depth - Driller TDL FT 11177. Total Depth - Logger BLI FT 11170. Bottom Log Interval TLI FT 10496. Top Log Interval DFT DEAD CRUDE/BORAX Drilling Fluid Type TLAB 13:45 04-DEC-1995 Time Logger at Bottom TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI SBHF SBHN SIGC SIBH TRAT SDSI BACK FBAC TCAN TCAF TCND TCFD TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector Background Count Rate - Far Detector Total counts analyzed - near detector (TDTP) Total counts analyzed - far detector (TDTP) Total capture counts - Near detector Total capture Counts - far dectector LIS Tape Verification Listing Schlumoerger Alaska Computing Center 12-FEB-1996 11:09 DEFI T~CN TorSi Selected Counts ]-Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude PAGE: 65 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) SIGM BS3 CU 100243 O0 000 O0 0 13 1 1 4 68 0000000000 TPHI BS3 PU 100243 O0 000 O0 0 13 1 1 4 68 SBHF BS3 CU 100243 O0 000 O0 0 13 I 1 4 68 SBHN BS3 CU 100243 O0 000 O0 0 13 1 i 4 68 SIGC BS3 CU 100243 O0 000 O0 0 13 I i 4 68 SIBH BS3 CU 100243 O0 000 O0 0 13 1 1 4 68 TRAT BS3 100243 O0 000 O0 0 13 I I 4 68 SDSI BS3 BU 100243 O0 000 O0 0 13 1 1 4 68 BACK BS3 CPS 100243 O0 000 O0 0 13 i i 4 68 FBA¢ BS3 CPS 100243 O0 000 O0 0 13 i 1 4 68 TBAN BS3 CPS 100243 O0 000 O0 0 13 I i 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: -~E2~-6~ .... E~--~6622~-'66-'-666--66 .... 6'-'~-'-~ ..... ~ ..... 2 ..... ~2 .... 6666666666-- ioo~ oo ooo oo o i~ i i , 68 oooooooooo TCND BS3 CPS TCFD BS3 CPS 100243 O0 000 O0 0 13 i 1 4 68 0000000000 TSCN BS3 CPS 100243 O0 000 O0 0 13 1 1 4 68 0000000000 TSCF BS3 CPS 100243 O0 000 O0 0 13 1 I 4 68 0000000000 INND BS3 CPS 100243 O0 000 O0 0 13 1 i 4 68 0000000000 INFD BS3 CPS 100243 O0 000 O0 0 13 1 I 4 68 0000000000 TENS BS3 LB 100243 O0 000 O0 0 13 I 1 4 68 0000000000 GR BS3 GAPI 100243 O0 000 O0 0 13 I 1 4 68 0000000000 CCL BS3 V 100243 O0 000 O0 0 13 I i 4 68 0000000000 66 ** DATA ** DEPT. 11191.500 SIGM.BS3 10.510 TPHI.BS3 11.543 SBHF.BS3 SBHN.BS3 82.608 SIGC.BS3 0.123 SIBH.BS3 124.526 TRAT.BS3 SDSI.BS3 0.148 BACK.BS3 188.193 FBAC.BS3 45.235 TCAN.BS3 TCAF.BS3 30419.230 TCND.BS3 22624.309 TCFD.BS3 11852.480 TSCN.BS3 TSCF.BS3 6377.198 INND.BS3 2153.607 INFD.BS3 411.518 TENS.BS3 GR.BS3 464.250 CCL.BS3 0.000 DEPT. 10861.000 SIGM.BS3 9.947 TPHI.BS3 11.078 SBHF.BS3 SBHN.BS3 45.515 SIGC.BS3 0.783 SIBH.BS3 51.951 TRAT.BS3 SDSI.BS3 0.169 BACK.BS3 243.824 FBA¢.BS3 52.989 TCAN.BS3 TCAF.BS3 36993.484 TCND.BS3 33056.836 TCFD.BS3 15252.039 TSCN.BS3 TSCF.BS3 7771.755 INND.BS3 1933.424 INFD.BS3 461.887 TENS.BS3 GR.BS3 24.375 CCL.BS3 0.000 ** END OF DATA ** 55.289 1.302 48053.828 10074.180 960.000 32.226 1.375 62227.508 13073.029 1585.000 **** FILE TRAILER **** FILE NAME : EDIT .013 SERVICE : FLIC VERSION : 001C01 DATE : 96/02/12 HAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 12-FEB-1996 11:09 PAGE: 67 **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 96/02/12 ORIGIN : FLIC TAPE NAME : 96001 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA INC, DS 15-34, PRUDHOE BAY, 50-029-22474-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 96/02/12 ORIGIN : FLIC REEL NAME : 96001 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA INC, DS 15-34, PRUDHOE BAY, 50-029-22474-00 O ALASKA INC D.S. 15 - 34 PRUDHOE BAY Run 1' 16 - IVlay - 1994 DLL/ZDL/CN/GR GR logged up to 3760' 10560 11282 WESTERN ATLAS Wireline Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: OWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING RUN 1 6201.00 K. RICHARDS SEE REMARKS REMARKS: D.S. 15 - 34 500292247400 ARCO ALASKA INCORPORATED ATLAS WIRELINE SERVICES 20-MAY-94 OPEN HOLE RUN 2 RUN 3 22 liN 14E 1428 945 65.45 30.62 CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 7.625 10571.0 6.750 11310.0 DLL/ZDL/CN/GR. LOGS WITNESSED BY: J. HABETHUR, K. YOUNG. CIRCULATION STOPPED AT 06: 00, 16-MAY-94. CALIPER VERIFICATIONS PERFORMED IN CASING. LOGGED NEUTRON TO 200' ABOVE BASE OF HRZ & GAMMA RAY TO SURFACE CASING. NEUTRON LOG PARAMETERS: (CASED HOLE SECTION) SANDSTONE MATRIX, CHISM FILTERING ACTIVE, CALIPER CORRECTION = 9.875", CASING CORRECTIONS ACTIVE CASING THICKNESS = 0.375" CEMENT THICKNESS = 1.125", SALINITY = 0.0 PPK. (OPEN HOLE SECTION) SANDSTONE MATRIX, CHISM FILTERING ACTIVE, CALIPER CORRECTED, CASING CORRECTIONS NOT ACTIVE, SALINITY = 0.0 PPK. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR DLL SDN 2435 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA .5000 START DEPTH STOP DEPTH 10560.0 11230.0 10560.0 11282.0 10560.0 11255.0 10560.0 11237.0 GR (MEASURED DEPTH) BASELINE DEPTH LL3 10560.0 10560.0 10589.0 10589.0 10622.5 10631.5 10633.0 10633.0 10648.5 10650.5 10650.5 10654.0 10653.0 10656.5 10656.0 10672.0 10672.0 10673.0 10676.0 10677.0 10676.5 10679.0 10679.0 10683.5 10684.0 10683.5 10687.0 10687.0 10697.5 10697.0 10702.0 10702.0 10703.5 10736.5 10737.0 10737.5 10737.0 10741.0 10741.0 10743.0 10743.5 10743.0 10745.5 10747.5 10751.5 10752.0 10752.5 10752.5 10769.5 10782.0 10784.5 10790.0 10790.5 10791.0 10799.0 10801.5 10816.0 10790.0 all runs merged; EQUIVALENT UNSHIFTED DEPTH RHOB NPHI 10560.0 10560.0 10587.5 10621.5 10632.0 10633.5 10648.0 10650.5 10654.0 10656.0 10656.5 10672.0 10675.0 10676.5 10673.5 10684.0 10703.0 10735.5 10742.0 10745.0 10747.5 10752.0 10768.0 10782.0 10784.0 10790.0 10801.0 10815.0 10736.0 10740.5 10752.0 10769.5 10791.0 10799.5 no case 10816.5 10833.0 10838.5 10859.0 10867.0 10879.0 10898.0 10902.0 10904.5 10910.0 10910.5 10913.5 10918.5 10933.5 10942.5 10943.0 10953.5 10957.5 10962.5 10965.5 10966.0 10966.5 10975.5 10983.5 10988.0 11016.0 11017.0 11022.0 11037.0 11056.5 11057.0 11064.0 11068.0 11072.0 11085.0 11092.0 11108.0 11115.0 11115.5 11118.5 11119.0 11124.0 11124.5 11125.0 11133.5 11139.0 11139.5 11147.5 11155.0 11158.5 11160.5 11166.0 11168.5 11178.0 11183.5 11188.0 11190.5 11194.0 11195.5 11196.0 10816.0 10832.5 10866.5 10897.5 10901.0 10904.5 10910.5 10914.0 10933.0 10943.5 10958.0 10964.0 10967.5 10976.5 10988.0 11015.5 11021.0 11072.0 11110.0 11115.5 11120.5 11125.5 11140.5 11147.5 10837.0 10866.5 10878.0 10904.0 10910.5 10913.0 10919.0 10933.5 10943.5 10953.5 10957.0 10963.0 10966.0 10984.0 11017.0 11021.5 11056.5 11063.5 11067.5 11071.0 11085.0 11090.5 11107.5 11115.5 11119.0 11124.5 11139.5 11148.0 11155.5 11183.5 11195.5 10816.5 10859.0 10867.5 10902.0 10905.0 10934.5 10953.5 10962.5 10966.0 11022.0 11037.0 11055.5 11118.5 11123.5 11133.5 11147.5 11157.5 11160.5 11166.5 11169.5 11177.5 11188.0 11190.5 11194.0 11196.5 11215.0 11221.5 11234.0 11313.0 $ MERGED DATA SOURCE PBU TOOL CODE GR DLL SDN 2435 $ REMARKS: 11313.0 11214.5 11222.0 11220.5 11233.5 11313.0 11313.0 RUN NO. PASS NO. MERGE TOP 1 3 10560.0 1 3 10560.0 1 3 10560.0 1 3 10560.0 MERGE BASE 11230.0 11282.0 11255.0 11237.0 OPEN HOLE portion of MAIN PASS. LLD, SP, MTEM, TEND, & TENS WERE SHIFTED WITH LL3. DRHO, PEF, & CALl WERE SHIFTED WITH RHOB. FUCT & NUCT WERE SHIFTED WITH NPHI. CN WN FN COUN STAT / ? ?MATCH1. OUT / ? ?MATCH2. OUT / ??MATCH3. OUT $ : ARCO ALASKA INCORPORATED : D.S. 15 - 34 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Name Tool Code Samples Units GR DLL 68 1 GAPI LL3 DLL 68 1 OHMM LLD DLL 68 1 OHMM SP DLL 68 1 MV MTEM DLL 68 1 DEGF TEND DLL 68 1 LB TENS DLL 68 1 LB RHOB SDN 68 1 G/C3 DRHO SDN 68 1 G/C3 PEF SDN 68 1 BN/E CALl SDN 68 1 IN NPHI 2435 68 1 PU-S FUCT 2435 68 1 CPS NUCT 2435 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 57 515 01 6 4 30 739 95 0 4 30 739 95 0 4 30 739 95 0 4 30 739 95 0 4 30 739 95 0 4 30 739 95 0 4 22 779 91 0 4 22 779 91 0 4 22 779 91 0 4 22 779 91 0 4 98 211 23 1 4 98 211 23 1 4 98 211 23 1 56 * DATA RECORD (TYPE# 0) Total Data Records: 95 966 BYTES * Tape File Start Depth = 11313.000000 Tape File End Depth = 10560.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 22606 datums Tape Subfile: 2 305 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 3760.0 2435 9950.0 $ BASELINE CURVE FOR SHIFTS: GRCH CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH NPHI 3753.0 3753.0 10002.5 10002.0 10035.5 10035.5 10044.5 10043.5 10049.5 10048.5 10063.5 10063.0 10104.5 10104.5 10116.0 10116.0 10125.0 10125.5 10163.0 10163.0 10186.5 10186.5 10189.0 10189.5 10196.5 10196.5 10199.5 10199.5 10207.5 10208.0 10290.0 10289.5 10321.0 10321.0 10329.0 10328.5 10341.0 10341.0 10381.0 10381.0 10406.0 10406.0 10433.0 10433.0 10461.5 10461.0 10489.0 10489.0 10492.5 10492.5 10500.0 10500.0 10546.5 10546.5 10555.0 10554.5 10560.0 10560.0 $ REMARKS: STOP DEPTH 10560.0 10560.0 EQUIVALENT UNSHIFTED DEPTH into casing. CASED HOLE portion of MAIN PASS. FUCT, NUCT, TEND, & TENS WERE SHIFTED WITH NPHI. CN WN / ? ?MATCH4. OUT $ : ARCO ALASKA INCORPORATED : D.S. 15 - 34 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2435 68 1 GAPI 4 2 NPHI 2435 68 1 PU-S 4 3 FUCT 2435 68 1 CPS 4 4 NUCT 2435 68 1 CPS 4 5 TEND 2435 68 1 LB 4 6 TENS 2435 68 1 LB 4 4 08 501 10 0 4 98 211 23 1 4 98 211 23 1 4 98 211 23 1 4 98 211 23 1 4 98 211 23 1 24 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 379 Tape File Start Depth = 10560.000000 Tape File End Depth = 3753.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 95306 datums Tape Subfile: 3 438 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 3 .2500 VENDOR TOOL CODE START DEPTH GR 3760.0 DLL 10551.0 ZDL 2435 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): 10541.0 9950.0 STOP DEPTH 11253.5 11305.5 11277.0 11255.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MODL GR CN ZDL KNJT TEMP PCM KNJT MIS DLL FTS $ CABLEHEAD TENSION MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR KNUCKLE JOINT MASS ISOLATION SUB DUAL LATEROLOG FEED THROUGH SUB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: 16-MAY-94 FSYS REV. J001 VER. 1.1 600 16-MAY-94 1313 16-MAY-94 11310.0 11294.0 10560.0 11282.0 1800.0 TOOL NUMBER 3974XA 3517XA 1309XA 2435XA 2222EA/2222MA 3921NA 2806XA 3506XA 3921NA 3967XA 1229EA/1229MA 6.750 10571.0 10560.0 FLO PRO 9.30 66.0 9.5 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : REMARKS: MAIN PASS. $ CN WN FN COUN STAT : ARCO ALASKA INCORPORATED : D.S. 15 - 34 : PRUDHOE BAY : NORTH SLOPE : ALASKA 6.8 166.7 .090 .030 1.060 .000 1.200 .000 THERMAL SANDSTONE 2.65 .000 .0 51.0 166.7 68.0 .0 68.0 .0 * FORMAT RECORD (TYPE# 64) oNE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 GR DLL 68 1 GAPI RS DLL 68 1 OHMM RD DLL 68 1 OHMM SP DLL 68 1 MV TEMP DLL 68 1 DEGF CHT DLL 68 1 LB TTEN DLL 68 1 LB SPD DLL 68 1 F/MN ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN SHR ZDL 68 1 CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS SSN 2435 68 1 CPS 4 57 515 01 6 4 40 514 81 0 4 39 859 45 0 4 23 415 80 5 4 84 503 82 1 4 46 103 82 1 4 46 103 82 1 4 11 639 82 1 4 52 443 33 1 4 09 884 61 1 4 76 731 33 1 4 24 115 90 6 4 37 715 66 1 4 98 211 23 1 4 98 211 23 1 4 52 326 75 5 4 84 023 70 1 4 83 368 34 1 72 * DATA RECORD (TYPE# 0) Total Data Records: 2327 994 BYTES * Tape File Start Depth = 11313.000000 Tape File End Depth = 3753.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 597186 datums Tape Subfile: 4 2409 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 2 .2500 VENDOR TOOL CODE START DEPTH GR 10543.0 DLL 10551.0 ZDL 2435 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): 10552.0 10552.0 STOP DEPTH 11245.5 11297.5 11269.0 11247.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MODL GR CN ZDL KNJT TEMP PCM KNJT MIS DLL FTS $ CABLEHEAD TENSION MODAL SUB GAMMA RAY COMPENSATED NEUTRON Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR KNUCKLE JOINT MASS ISOLATION SUB DUAL LATEROLOG FEED THROUGH SUB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY ($): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): 16-MAY-94 FSYS REV. J001 VER. 1.1 600 16-MAY-94 1233 16-MAY-94 11310.0 11294.0 10560.0 11282.0 1800.0 TOOL NUMBER 3974XA 3517XA 1309XA 2435XA 2222EA/2222MA 3921NA 2806XA 3506XA 3921NA 3967XA 1229EA/1229MA 6.750 10571.0 10560.0 FLO PRO 9.30 66.0 9.5 6.8 166.7 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. $ CN WN FN COUN STAT : ARCO ALASKA INCORPORATED : D.S. 15 - 34 : PRUDHOE BAY : NORTH SLOPE : ALASKA .09O .030 1.060 .000 1.200 .000 THERMAL SANDSTONE 2.65 .000 .0 51.0 166.7 68.0 .0 68.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 18 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR DLL 68 1 GAPI 4 2 RS DLL 68 1 OHMM 4 3 RD DLL 68 1 OHMM 4 4 SP DLL 68 1 MV 4 5 TEMP DLL 68 1 DEGF 4 6 CHT DLL 68 1 LB 4 7 TTEN DLL 68 1 LB 4 8 SPD DLL 68 1 F/MN 4 9 ZDEN ZDL 68 1 G/C3 4 10 ZCOR ZDL 68 1 G/C3 4 11 PE ZDL 68 1 BN/E 4 12 CAL ZDL 68 1 IN 4 13 SHR ZDL 68 1 4 14 CNC 2435 68 1 PU-S 4 15 CNCF 2435 68 1 PU-S 4 16 CN 2435 68 1 PU-L 4 17 LSN 2435 68 1 CPS 4 18 SSN 2435 68 1 CPS 4 4 57 515 01 6 4 40 514 81 0 4 39 859 45 0 4 23 415 80 5 4 84 503 82 1 4 46 103 82 1 4 46 103 82 1 4 11 639 82 1 4 52 443 33 1 4 09 884 61 1 4 76 731 33 1 4 24 115 90 6 4 37 715 66 1 4 98 211 23 1 4 98 211 23 1 4 52 326 75 5 4 84 023 70 1 4 83 368 34 1 72 * DATA RECORD (TYPE# 0) 994 BYTES * Total Data Records: 237 Tape File Start Depth = 11305.000000 Tape File End Depth = 10537.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 153694 datums Tape Subfile: 5 317 records... Minimum record length: Maximum record length: 62 bytes 994 bytes Tape Subfile 6 is type: LIS 94/ 5/20 01 **** REEL TRAILER **** 94/ 5/24 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 24 MAY 94 2:05p Elapsed execution time = 37.13 seconds. SYSTEM RETURN CODE = 0