Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout194-122oN oR BEFORE C:LO~VIF~LN~DOC PLUGGI_N= & LOCATION CLE~-~,NCE R~.PORT State of Alaska .ALASK~ 0iL & GAS CONSERVATION COM/~ISSION Well ."fame Review the well file, az~.d' c.'-~.e~= on plugging, well head . o *--- STATE OF ALASKA ALASKA ...,L AND GAS CONSERVATION COMM';,.,SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack i. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 194-122 300-156 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21769-01 4. Location of well at surface ''t.f,,]r-,~lK;71~tl~ I 9. Unit or Lease Name 1786' SNL, 501' WEL, SEC. 06, T11 N, R14E, UM,.,, . , Prudhoe Bay Unit At top of productive interval 683' SNL, 1623' WEL, SEC. 07, T11N, R14E, UM At total depth i' 10. Well Number E-24A 2648' SNL, 1430' WEL, SEC. 07, T11N, R14E, UM 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE = 65.33' ADL 028304 12. Date Spudded10/11/94 ! 13' Date T'D' Reached 114' Date C°mp'' susp'' °r Aband'l 1/11/94 6/26/2000 115' water depth' if °ffsh°reN/A MSL 116' N°' °f C°mpleti°nsZero 17' T°tal Depth (MD+TVD)118' Plug Back Depth (MD+TVD)12240 8930 FT 12166 8929 FTI, 119' Directi°nal Survey I 20'[] Yes [] No Depth where SSSV set. 21. Thickness of PermafrostN/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run GR .2.3. CASING, LINER AND CEMENTING RECORD CASING SE-I-FING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED ,. 20" Insulated Conductor Surface 110' 8 cu yds Concrete 13-3/8" 72# L-80 / S-95 38' 2675' 17-1/2" 1863 cuft PF 'E', 1860 cu ft PF 9-5/8" 47# L-80 35' 9816' 12-1/4" 2078 cuft Class 'G' 7" 26# IJ4S 9568' 9839' 8-1/2" 400 cuft Class 'G' 5" 15# 13Cr80 9400' 12240' 6" 276 cuft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 9405' 9345' MD ........... MD TVD i'*:~.~'"'-"'~';~'~7,!'~? ~;',~?~ ..... ~ " 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ^! !'" 0 '*"',¢-':-~. 10320' Set Whipstock 10320' P&A with 36 bbls Class 'G', Sqzd to 1000 ps~ 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ORIGINAL Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Subsea Shublik 9866' 8340' Top of Sadlerochit 9955' 8400' Zone 3 10153' 8539' 31. List of Attachments: Summary of Daily Drilling Reports 32. I hereby certify that the foreg.oing is true and correct to the best of my knowledge Signed TerrieHubble ,,~[/~ ~ Title TechnicalAssistant Date(~-~",-(~ E-24A 194-122 300-156 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5; Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. i ', i ~ i ' Form 10-407 Rev. 07-01-80 Well: E-24B Accept: 07/01/00 Field: Prudhoe Bay Spud: 07/08/00 APl: 50-029-21769-02 Release: 07/11/00 Permit: 200-091 CTD Unit: Nordic #1 PRE-RIG WORK 06/25/00 RU SWS 2145. Lay lubricator on ground and orientate whipstock. Orientation complete, finalize whipstock assembly and stab onto well and PT. RIH. PUH through GLM #1 while logging for tie in to GR/CCL dated 11/24/94. RIH, passing through tight spot in tubing tail (9390'-9409') without problems. PUH and log 3 collars below and above 10,307' to verify on depth (CCL to top of whipstock is 13'). RIH to 10,380' and attempt to set whipstock. Unable to set whipstock, out of desired orientation window. Continue to make attempts to set whipstock by varying speeds while RIH and PUH. Closest orientation is roughly 55 degrees left of the high side one joint above (10,270' to 10,312') desired whipstock set point of 10,320' (top of joint located at 10,312'). Call Well Operations Team Leader to discuss next plan of attack. Receive approval from Anchorage Drilling Engineer to set whipstock at 55 degrees left of the high side in the joint from (10,270' to 10,312') rather than risk getting stuck in the damaged tubing tail. PUH to 10,267' - top of whipstock is at 10,280', RA tag is at 10,288.9'. Whipstock is oriented 44 degrees left of highside. Unable to set whipstock - short in the tool string. SWS to attempt switching modules in the logging unit prior to attempting to POH and through the TT. New module produces similar results, unable to set whipstock. POH. Able to pass through tight spot at TT from 9390' to 9409' with no problems. At surface - lay down lubricator and examine tool string. Found that some portions of the tool string were flooded. Call to SWS shop for replacement parts. O6~26~OO MIRU DS CTU #2. Pressure test surface equipment. Perform full BOP test. RIH while loading hole with seawater. Well took fluid with little or no pressure. No problems passing through tailpipe. Tagged whipstock at 10,317' ctmd, corrected to 10,320' elmd. Whipstock in place. With choke closed, pumped 5 bbls straight cement followed by 25 bbls cement with aggregate followed by 6 bbls straight cement. At 25 bbls away (cement covering perfs) noted first sign of pressure build up. Continued pumping cement with choke closed until 34 bbls cement out nozzle, WHP - 200 psig. Open choke and maintain 200 psig until remaining cement out nozzle, PUH to safe. Shut down, hesitate 30 min. Bump pressure up to 600 psig. Hesitate 30 min. Bump pressure up to 1000 psig. Hesitate 15 min. Bump pressure back up to 1000 psig - good squeeze. Bleed pressure back to 200 psig. RIH contaminating with Biozan. Found stringer/bridge at 9818'. Worked down to 9848' encountering harder cement. Elected to abort further attempt to contaminate deeper. POH. Based on hard cement depth, approx. 9 bbls. cement (470') remains on top of whipstock, leaving 25 bbls below whipstock covering perfs and approx. 2 bbls into perfs. O6~26~OO Tool string re-made, tested, and re-oriented. Stab on to well, PT, and RIH. PUH through GLM #1 while logging for tie in to GR/CCL dated 11/24/94. RIH, passing through tight spot in tubing tail (9390'-9409') without problems. PUH and log collars to verify on depth with GR/CCL dated 11/24/94. Locate CCL at 10,307' - top of whipstock at 10,320'. Orientation is zero degrees (high side) looking downhole. Set whipstock at 10,320', orientation is zero degrees from high side - RA tag is located at 10,328.9'. PUH and RIH to tag whipstock - verify whipstock is set at 10,320'. POH. Pull through TT with no difficulties - continue to POH. At surface RD SWS 2145. Notify PC and Pad Operator whipstock has been set and well is SI. Well is freeze protected with 33 bbls MEOH (6/23/00) BP AMOCO Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: E-24 E-24 DRILL+COMPLETE DOWELL SCHLUMBERGER NORDIC 1 Start: Rig Release: Rig Number: 6/28/2000 Page 1 of 6 Spud Date: 7/1/2000 End: Group: COIL Date 7/1/2000 7/2/2000 From - To 06:00 - 07:00 07:00 - 09:00 09:00 - 13:00 13:00- 15:00 15:00 - 16:00 16:00 - 16:30 16:30 - 17:15 17:15- 17:45 17:45 - 20:15 20:15 - 21:00 21:00 - 22:00 22:00 - 00:00 100:00 - 02:00 02:00 - 04:00 04:00 - 05:00 !05:00 - 08:30 i08:30 - 09:00 1.00! MOB PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 ~PROD1 PROD1 :PROD1 ~PROD1 i PROD1 i PROD1 PROD1 PROD1 PROD1 PROD1 2.00 MOB 4.00 RIGU 2.0( RIGU 1.00 RIGU 0.50 RIGU 0.75 RIGU 0.50 STWHIP 2.50 STWHIP 0.75 STWHIP 1.00 STWHIP~ · 2.00 STWHIP 2.001STWHIP 2.001S'BNHIP 1.00! STWHIP: 3.50i STWHIP' 0.50 ~ STWHIP 0.25 ~ STWHIPi 09:00 - 09:15 i 09:15- 11:00 11:00 - 11:30 1.75 0.50 1.75 0.25 0.2~ 1.0( 2.25 0.75 0.75 2.50 S TWHIP: STWHIP, S'I'WHIP STWHIP DRILL DRILL DRILL DRILL DRILL DRILL ~11:30- 13:15 113:15 - 13:30 113:30 - 13:45 113:45 - 14:45 !14:45 - 17:00 i 17:00 - 17:45 17:45- 18:30 18:30 - 21:00 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 :PROD1 PROD1 FILL .PROD1 :21:00 - 23:00 i23:00 - 23:30 !23:30 - 00:00 2.00~ DRILL 0.50~ DRILL 0.50~ DRILL FILL FILL FILL PROD1 : PROD1 PROD1 Description of Operations Accept rig on E-24b at 06:00 hrs on 07/01/2000. Scope up derrick. Set up cuttings tank and rig up for BOP test. Test BOPE to 250~4000 psi. Witnessing of test waived by J. Spaulding - AOGCC inspector. Open swab and master valves. Slight blow but well is dead. Re-build packoff in injector head. Stab coil into injector. MU coil connector Fill coil with seawater and pump dart. Coil vol from dart = 59.0 bbl MU window milling BHA #1 with 3.8" HC diamond window mill, short string mill and HP motor. RIH with BHA #1. ;Tag XN Nipple at 9391' CTD, correct to 9397 ft BKB. Mill XN nipple. 'r Mill out end of 4 1/2" tailpipe, Caliper and drift runs during well prep proved end of tailpipe was undergauge. Mill from 9405 - 9410 ft. Back ~: ream to 9390 - 9410 ft. ~RIH with mill to top of cement at 9854 ft. Mill cement at 120 FPH with i HC window mill and seawater. Mill cement from 9854 - 10004 ft. i Mill cement from 10004 - 10210 ft. 2.7 BPM, 2050 psi, 120 FPH. '.Circ. 30 bbl sweeps of used FIoPro every 50 ft. i Mill cement from 10210 - 10300 ft. Circ. FIoPro sweeps as necessary. i Mill cement to top of whipstock. 1780 psi, 2.7 BPM, 16K D. Wt. ~ Mill window starting at 10320 ft. Flag CT at 10320 ft. ! Milled to 10325.9' and mill appeared to complete window - increased i motor work. i Continue milling in open hole and start dressing window with string mill i to 10327'. i Pick up and check weights. Run in and see increased motor work at i 10325.5'. : Increase WOB and mill into formation. Stall & PU. Tag up and mill open hole -several stalls at window but finally smoothed out. Mill open hole to 10336'. Pump FIo-Pro sweep around. Window 10320-10326'. Open hole 10326-10336'. Work milling assembly across window to verify clean. Make 2 dry passes thru - looks good. No weight or pressure changes. POH. No problems coming back thru tailpipe. Stand back injector. LD milling 13HA. PJSM prior to PU drilling BHA. MU Drilling BHA #2 w/STC M09BQPX. MU coil conn& stab injector. RIH. Correct to flag at 10234.3' EOP - 10299.3' bit depth. Orient around to go thru window - couldn't get thru on first attempt. Get clicks but weak tool signal - possibly aerated mud. Repair hydraulic hose on reel motor (15 min). Continue trying to work thru window getting clicks without TF readings. Orient TF. Getting MWD pulses. Unable to get thru window at 25R. 'Orient around. Unable to get thru window at 20L, 10R, 30R, 50R and 90R. POOH with MWD BHA. Unable to get out window. i Lay out MWD BHA. Bit heavily chipped/worn on shoulder. M/U window milling BHA with 3.80" diamond mill and 3.80" string : reamer. Printed: 8110/2000 2:07:42 PM BP AMOCO .... _.. ,,, ::, ,,.,.,,. Page 2 of 6 "; i /' 'i , '.".~. '.:',-: Operations Summary Report ,..;,::,:... ?:¢; '¢;;.'~;... , ::' ...;; ..-. .. ' ",: .:'h "~: '- ~ Legal Well Name: E-24 Common Well Name: E-24 Event Name: DRILL+COMPLETE Contractor Name: DOWELL SCHLUMBERGER Rig Name: NORDIC 1 Date ! From-To Hours,Activity Co~ Phase 7~3~2000 00:00 - 01:30 1.50 STWHIP; FILL PROD1 01:30 ~ 03:00 1.50: STWHIP, PROD1 03:00 - 05:00 05:00 ~ 06:30 06:30 - 08:15 08:15 ~ 08:30 08:30 ~ 08:45 08:45 ~ 09:30 09:30 ~ 11:15 11:15- 11:30 11:30 ~ 11:45 11:45 - 12:15 12:15- 14:00 14:00- 14:15 14:15- 16:30 16:30- 16:45 16:45 - 18:00 7/4/2000 18:00- 18:15 18:15- 19:00 19:00 - 20:40 ;20:40 - 21:00 ;21:00 - 22:30 22:30 - 23:10 23:10 - 00:00 00:00 - 00:30 ;00:30 - 01:00 01:00 - 03:15 03:15 - 03:45 03:45 - 04:30 04:30 - 06:00 06:00 - 07:30 07:30 - 08:00 08:00- 10:15 2.001STWHIP; 1.75~ S-I'WHIP 0.25; STWHIP; 0.25 STWHIP! 0.75 STWHIP i 1.75 STWHIPi 0.25 STWHIP 0.25 STWHIP 0.50 DRILL 1.75 DRILL 0.25 DRILL 2.25 DRILL 0.25 DRILL 1.25 DRILL 0.25 DRILL 0.75 DRILL 1.67 DRILL 0.33~ DRILL 1.50i DRILL 0.671 DRILL 0.83 DRILL 0.50 S'TWHIP i 0.50 STWHIP! 2.251STWHIP ! 0.50 STWHIP i 0.75~ STWHIP 1.50 ! STWHIP 1.50 STWHIP: 0.50 ~ STWHIP i 2.25 ~ STWHIP FILL FILL FILL FILL FILL FILL FILL FILL FILL FILL PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 , PROD1 ;PROD1 i PROD1 ~PROD1 i PROD1 PROD1 PROD1 i PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 . PROD1 PROD1 10:15- 11:15 11'15- 13:30 1.00 STWHIP 2.25' STWHIP ~ PROD1 · PROD1 13:30- 14:00 14:00- 15:00 15:00 - 16:30 0.50: S TWHIP~ . 1.00 STWHIP 1.50' S'I'WHIP:: PROD1 ~PROD1 : PROD1 Start: Rig Release: Rig Number: 6/28/2000 Spud Date: 7/1/2000 End' Group: COIL Description of Operations RIH with miilling / reaming BHA. 'Tag fill above whipstock, cleanout fill. Correct depth to flag at 10,320 ft. First motor work 12 ft above top of whipstock. Mill to TD of 10,338 ft. [2 ft of new formation]. Backream to 10310' Ream up and down from 10320-10334 ft, four times. Slight motor work. RIH to TD with no pump. Hole OK. Ream window area, RIH with no pump, clean to TD. POOH clean. Ream down slow, clean window in and out. Flag CT at 10,200 POOH with milling BHA. Stand back injector. LD motor and mills. PJSM prior to MU drilling BHA. . MU drilling BHA #4 w/Smith M09BQPX rebuild RIH with BHA #4. Shallow test MWD - OK. Orient above previous TOC for highside to go thru window. RIH. Correct to flag at 10265' o (-19.8'). Cont RIH and go thru window - "slight pump press incr at top of window. Tag btm at 10338'. ~Orient below window for left turn. Drill ahead to 10340'. Get 2 clicks. Drill to 10350 - 118L. Get 1 click. ! Drill to 10415' - 2.6/2.6 bpm. 3510 psi. 90-50L. 'Orient around for 70-80L. : Drill ahead to 10425'. Get 1 click. Drill. Get 1 click. Drill to 10455'. with 3 i clicks - TF keeps wanting to roll left and trying to hold 60-70L. Get 1 iclick & drill to 10500'. Pump up survey - bad G total. "Short trip to window and back to bottom. Drill ahead - 2.6/2.6 bpm. 3230 psi. 62L Drilling slow and getting slower - bit may be balled or crippled from chert/pyrite. Try to unball - no Success. POH. Flag pipe at 10365'. Pull up to 10315'. Log GR at 10279 ft. Add 1.5 ft to CTD. Flag CT at 10200' EOP. POOH for new bit. Change out bit. RIH with Bit #3, correct CTD at flag, [-17 ft]. Read TF of 160R Orient TF to 50L RIH thru window with no problem. Drilling, TF=62L, 2.5 BPM, 2900 psi, ROP = 40 FPH Drilling, TF=45L, ROP = 150 FPH, 2.6 BPM, 2900 psi. Orient around, Drilling, TF=73L, ROP = 140 FPH, 2.6 BPM, 2900 psi. Short trip to window. Drilling, TF= 60L, ROP = 110 FPH. 2.6 BPM, 3000 psi. Drilling, TF=40L, Balled bit, work CT to clear bit. Spud and clear bit. Drilling, TF=17L, ROP=100 FPH, 2.6 BPM, 3250 psi. Get I click at 10790' to 5L. Drill to 10810'. Cont drilling for build to land well. Having some weight transfer problems. 2.712.7 bpm. 3050 psi. 5R. :Well landed at 8867' TVDss (10819' MD) with est 91 deg inc on bottom. POH for bit & motor change. Flag pipe at 10565' - (10500' EOP). Tie in to RA tag. Corr'n (+3'). Stand back injector. Change bit and motor to 1.1 deg. Change out MWD. MU injector. RIH with BHA #6 & bit #4 - HYC DS49H+GJNU. Stop at flag and correct depth to 10568' - (Corr'n: -19.3'). RIH and tag bottom at 10820'. Orient around for 90L ~ Drilling horizontal hole in Zone 1 sand / shales. !Drilling, TF=89L, 80 FPH, 2.7 BPM, 3200 psi, Stacking wt. Printed: 8/1012000 2:07:42 PM ~--. STATE OF ALASKA ~-- ALASK. .)ILAND GAS CONSERVATION COb, ', 3SION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface ,/ .,/" ,./ 1786' SNL, 501' WEL, SEC. 0t~,T11 N, R14E, UM At top of productive interval 683' SNL, 1623' WEL, SEC. 07, T11N, R14E, UM At effective depth 2575' SNL, 1443' WEL, WEC. 07, T11N, R14E, UM At total depth 2648' SNL, 1430' WEL, SEC. 07, T11N, R14E, UM 6. Datum Elevation (DF or KB) KBE = 65.33' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number E-24A 9. Permit Number 194-122 ,/ 10. APl Number 50- 029-21769-01 'v/' 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 12240 feet`,/` 8930 feet ~/ Plugs (measured) Baker IBP set at 11782' (04/95) 12166 feet Junk (measured) 8929 feet Length Size Cemented 110' 20" 8 cu yds concrete 2637' 13-3/8" 1863 cu ft PF 'E', 1860 cuft PF 9805' 9-5/8" 2078 cu ft Class 'G' 271' 7" 400 cu ft Class 'G' 2840' 5" 240 sx Class 'G' ORIGINAL MD 110' 2675' 9816' 9568' - 9839' 9400' - 12240' TVD 110' 2675' 8367' 8174' - 8385' 8044' - 8930' Perforation depth: measured 10950'-11054', 11244'-11275', 11376'-11656', 11820'-12150' true vertical 8932'-8932', 8929'-8928', 8926'-8919', 8921'-8928' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 9405' Packers and SSSV (type and measured depth) TIW 'HBBP' packer at 9345'; Otis SSSV Landing Nipple at 2190' 13. Attachments [] Description Summary of Proposal 4. Estimated date for commencing operation June 14, 2000 16. If pcr,,o/g~osal was verbally approved Name of approver r' i .~"¢C,~ J 15. I Date Approved Contact Engineer Name/Numbec Ted Stagg, 564-4694 [] Detailed Operations Program [] BOP Sketch Status of well classifications as: []Oil [] Gas []Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foEego, Lpg is_true and correct to the best of my knowledge Signed Ted Stagg .~--~//~~ Title CT Drilling Engineer Conditions of Approval: Notify Commission so representative may witness Plug integrity '~ BOP Test "~ Location clearance Mechanical Integrity Test__ Subsequent form required 10- ORIGINAL SIGNED BY Approved by order of the Commission [~ Ta¥1,0r SeafT!gUnt Form 10-403 Rev. 06/15/88 J Approval No. ~0 -- ~:5(g Returned Submit ~n Trip'cate hared _, ervices rilling Date: June 12, 2000 To: Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Blair Wondzell Sr. Petroleum Engineer Re: Well E-24A Prep for CT Sidetrack Well E-24a is scheduled for a through tubing sidetrack to be drilled with coiled tubing. The following summarizes the procedure required to prepare E- 24a for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of this proposed completion is attached. 1. A Tubing Integrity Test, whipstock drift and Kinley caliper log are scheduled to be done. 2. E-Line will set a mechanical whipstock at 10340' MD. $. Service coil will squeeze approx. 20 bbls cement past the whipstock to shut off existing perfs. 4. Service coil will then be used to mill the window. Service coil BOPE will be pressure/function tested with AOGCC witness prior to milling. Step 3 is scheduled for approx. June 14, and step 4 is scheduled for June 15, 2000, pending AOGCC approval. Ted Stagg J"~ ~/-xd~,,o Senior CT Drilling Engineer cc: Well File Petrotechnical Data Center TREE: 4-1/16" FMC W/7'q'REE CAP WELLHEAD: McEVOY ACTUATOR: AXELSON Cemented 13 3/8" 72# L-80 BTRS 12,6751 4-1/2" 12.6# L-80 MOD BTRS TUBING ID: 3.958" CAPACITY: 0.01522 BBL/FT KOP: 2800' MAX ANGLE: HORIZONTAL 9-5/8" Tie-Back Sleeve (T~W) I 9,400 7" Liner Top I 9,5681 9 5/8" 47# L-80 BTRS/NSCC I 9,816 1 ~ E-24b Proposed Completion KB. ELEV = 67.48' BF. ELEV = 31.78' SSSV LANDING NIPPLE I I 2, 1 9O (OTIS) (3.813" ID) I I GAS LIFT MANDRELS Merla TGPD W/1.5" RK LATCHES N° MD(BKB) TVDss Dev 3 4,323 4,137 37° 2 7,703 6,726 41 o I 9,180 7,806 39° X-NIPPLE (OTIS) (3.813" ID) I 9,3281 9-5/8" PACKER (TIW "HBBP") (4.00"lB) I 9,3451 4-1/2", 12.6/f/ft, L-80 TAILPIPE 4-1/2" X-NIPPLE (OTIS) (3.813" ID) 19,3761 4-1/2 .... XN" NIPPLE (OTIS) (3.725" ID) I 9,3931 .4-1/2" WLEG 9,405 (ELMD) 9,409 E-24b whipstock to be set approx. 10,340'. 2 7/8" liner to be cemented to 200' above the window. Existing perfs to be downsqueezed w/cement. PERFORATION SUMMARY REF. LOG: GR/CCL 11/24/94 Size ISPF I Interval IOpen/Sqzed 3_3/8,,I 4 110,950-11,054 IOpen 3-3/8" I 6 1~1,244- 11,275 IOpen 3-3/8"I 4 111,376-11,656 IOpen IBP set @ 11,782 3-3/8" 4 I 11,820- 12,150 [Open I 98391 T°p°f7' Window ~=~- ~ Baker IBP Fishing Neck, set 4/2/95 1,772 PBTD 12,166 5",15/f,13CR,STLShoe 12,240 HORIZONTAL WELL BORE 13 CR LINER STATE OF ALASKA ALA~<A OIL AND GAS CONSERVATION COMMIS, REPORT ;_ SUNDRY WELL OPI- ATIONS 1. Operations performed: Operation shutdown m Stimulate~ Pluggingm Pull tubing Alter casing m Repair well Perforatex Other__ 2. Name of Operator BP Ex/~loration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorac~e, Alaska 99519-6612 4. Location of well at surface 1786'SNL, 501' WEL, SEC. 6. T11N, R14E At top of productive interval 1086' SNL. 1646' WEL, SEC. 7, T11N, R14E At effective depth 2575' SNL, 1444' WEL, SEC. 7, T11N, R14E At total depth 2646' SNL, 1408' WEL, SEC. 7, T11N, R14E 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KB = ~7,4~' 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number E-24A (32- 7-11-14 ) 9. Permit number/approval number 94-122 / 10. APl number 50-029-21769-01 11. Field/Pool Prudhoe Off Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural .. Conductor 110' Surface 2199' Intermediate 2637' Production -- Liner 6560' Perforation depth: 12240' 8930' 12166' 8928' Size feet Plugs (measured) feet feet Junk (measured) feet Cemented Measured depth 146 2235 2673 20" 13-3/8" 13-3/8" 8 cuvds Concrete 1963 cuft PF "E"/1860 5" 240 sx Class "G" 9400-12240 measured 10950;11054', 11376;11376;11656', 11820;12150' true vertica~ubsea 8933'-8932', 8926'-8919', 8921'-8928' Tubing (size, grade, and measured depthS-1/2", L-80 to 9405' Packers and SSSV (type and measured depthPacker @ 9345' SSSV @ 2190' True vertical depth BKB 146 2206 2644 8015~8900 ORIGINAL 13. Stimulation or cement squeeze summar~ee Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure S/I 732 Tubing Pressure 12524 21 83 95 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operates__ Oilx Gas Suspended 17. I hereby certify that,the fo~(oing is true aod~rrect to the best of my knowledge. Signed _ Title Technical Assistant III Form 10-404 F~'ev 06/15/88 ~ Service Date SUBMIT IN DUPLICATE E-24A DESCRIPTION OF WORK COMPLETED ADD PERFS 11/30/96 SUMMARY The following additional interval were perforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 11244' - 11275' MD t t~ ..~ is. E IR iq ~ T D/.',, T A T ~ ,,.~ T A._F' L I I S 91.~..- /22 '?0'10 ~.'iWD SPERR;¢' S FI,~ EVAL '"~/ki W D SPERRY 9~,'" i 22 70 i 2 ~i~dV'ID SPERRY S Fl'~ EVAI_, '~ ~. 2 ',.? D 9 Z~ .-- I 22 'S R / (:; C L ~9 I 00 '" I 0658 i 9h-"' i22 F'DK ~'10600"' i2130 9~+ ..... i22 F'DLS/STAT PRESS ~:10~00 ..... 1063i 1 9h."'122 F'ROD PRFZLE ~00""I i i75 i 9~'--i22 S(SRC/SROP B~D ~ 9780 10632 ST~ 1&.2 i ' 16 9 h --- i 22. S ':'::~ R C ,/S R 0 P kl D ~ 9839 "- 'l 2239 'i '/" 2 ',; 9h'-"i22 SGRC/SROP TVD ~3386 897B ST ~J18~2 '1""16 9h-""122 S'qRC/SROP TVD ~9839'-'8933 i7" 2 S F I~ E VA L oBpJoqouv ul~lgs~uguoo 'suoo seD 'g !{0 e){sepV 66[ C08L-e9S (L06) og X~& aO I0g o~TnS ~aa~S 8 009~ sooT~oS ~u~Ia~M s~I~ uosIn~6 'G A~upoH 'u$~ :o~ u~n~a pu~ uBTs ss~I6 I0'60E9 S0'g98S 'ON I # un~I I # un}{ I # un~I SI~ + ~A DMG~ I SI~ + ~6~A DMG~ I SI~ + H6~ DMG~ I NOI~6IHDS~G # :~oloq poq~.~ssap s~ ~g~p og~ pu~.~ os~oId 'pasolDu.g 'urep~14/~. S %Ik54 :Aq ~uas w~wG go I~ymsu~xz ~66I X~naqal I : HH 'I0~66 HD~gHOHDN-~ HAIHG ~HI~DHO6 I00T NOIZ~AHHSNOD S~D + ~IO %DISkrl~ 'U$$~ ~Nkn6D XHH~ RECEIVED JAN 2 ;' 1995 Alaska 011 & Gas Cons. Commiss|OIl' Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 18 January 1995 RE: Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL E-S F-OS DESCRIPTION 1 PFC/CCL FINAL BL+RF 1 PDK FINAL BL + RF 1 PFC/PERF FINAL BL+RF 1 PDK FINAL BL+RF ECC No. Run ~ 1 1291.06 Run # 1 1311.01 Run # 1 4050.02 Run # 1 6309.01 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: 0 FI I I__1--1N [:S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs - E-24A AK-MW-40082 January 4, 1995 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, gG, Anchorage, AK 99518 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-21769-0 1 Blueline 1 Folded Sepia 2" x 5" TVD Resistivity and Gamma Ray Logs: 50-029-21769-01 2" x 5" MD Resistivity and Gamma Ray Logs: Sidetrack gl and Sidetrack g2 50-029-21769-71 2" x 5" TVD Resistivity and Gamma Ray Logs: Sidetrack gl and Sidetrack g2 50-029-21769-71 1 Blueline 1 Folde~-~;la 1 Blueline 1 Folded Sel~. 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classilication of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] , 2. Name of Operator 71 Permit Number 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21769-01 4. Location of well at sudace 9. Unit or Lease Name 1786' SNL, 501' WEL, SEC. 6, T11N, R14E ..... ' ............... ~ ~~t;~Pru.clhqe ,Bay Unit At Total Depth i-~~::;~,,; ... ~!Pruclhoo Bay Field/Prudhoo Bay Pool i5. Elevation in feet {indicate KB, DF, etc.) I~. Lease Designalion and Serial No. KB~ ~ 65.33' ! ADI. 28304 12. Date Spudded 13.'Daie I.D. Reached 14. Date Comp., Susp. or Aband.' 115. Water Depth, il oflshore 116. No. of Completions 10/11/94 11/11/94 11/18/94I N/A feet MSL I One lY. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)'19. Directional Survey 120. Depth where sSsv set 121. Thickness of Permafrost 12240'MD/8930' TVD 12166'MD/8928' TVD YES [] NO []I 2190'feet MD'1 1.900'(Approx.) 22. Type Electric or Other Logs Run GR 23. CASING, LINER AND CEMENTING RECORD SE'FI'lNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMEN'flNG RECORD AMOUNT PULLED 20" Conductor Surface 110' 8 cu,yds Concrete 13-3/8" 72# L-80 Surface ' '2235' 17-1/2" 13-3/8" 72# S-95 2235' 2673' 17-1/2" 1863 cu ft PF"E"/1860 'cu PFI ' 9-5/8' 47# L-80 Surface 9839' 9-5/8" 2078 cuft Class "G" 5" 15# 13CR80 9400' 12240' 6" 240 sx Class "G" 24. Perforations open to Production (MD+TVD of Top and Bolt~m and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD/ PACKER SE.T (MD/ Gun Diarneter 3-3/8" ~_¢pDf 4-1/2", L-80 9405' 9345' MD .. - 10950'-11054' 8933'-8932' 11376'-11656' 8926'-8919' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. .... 11820'-12150' 8921 '-8928' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production JMethod of bperation (Flowing, ~as lili, ~tc'.) 1 1/29/94 I Flowing7 Date °' Test H°urs Tested TEST PRODUCTION FOR OIL-BBL PERIOD IGAS'MOF WATER'BBL CROKESIZE IGAS'OIL RATIO Flow Tubing Casing Pressure 3ALCULATED OIL-BBL IGAS-MCF WATER-BBL ::3IL GRAVITY-APl (corr) Press. 24--HOUR RATEI . 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence el oil, gas or water. Submit core chips. RECEIVED DEC 2 ?_ 1994- A,~r~ska Oil & Gas Cons. Commissior, Anchor~" Submit in duplicate Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. ] GEOL~ MARKERS FORMATION TESTS NAME Include inlerval tested, pressure data, all fluids recovered and gravily, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. ' ' Subsea Shublik 9866' 8340' Top Sadlerochit 9955' 8400' Zone 3 10153' 8539' RECEIVED 2 2 199q. 31. LIST OF A'FI'ACHMENTS Anch0r~. -, 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: E-24A BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 10/04/94 03:00 SPUD: RELEASE: OPERATION: DRLG RIG: DOYON 14 WO/C RIG: DOYON 14 10/05/94 ( 1) TD:10735 PB:10692 10/06/94 (2) TD:10735 PB:10692 10/07/94 (3) TD:10735 PB:10692 10/08/94 (4) TD:10735 PB:10692 PULL TBG T/FLOOR MW: 8.5 Seawater MIRU. ACCEPT RIG @15:00 HRS. ON 10/4. TAKE ON SEAWATER, SPOT SLOP TANK & CIRC. LINES T/WELL HEAD. RU FIELD SERVICE LUBRICATOR & PULL BPV F/TREE. PUMP DOWN ANNUL & RECOVER DIESEL F/TBG. CHANGE LINES, PUMP DOWN TBG & RECOVER DIESEL F/ANNUL. CON'T. T/CIRC. FULL CIRC. RD LINES & SET 2 WAY CHK. ND 6" TREE & ADPTR FLNG. CLEAN CMT & IRON F/FLOW LINE. NU BOP'S. TEST BOP'S & MANIFOLD T/5000. LEAKING PAST TBG HNGR. CONDUCT RUNNING FLANGE TEST T/5000. PULL TBG T/RIG · FLOOR, STRING WT W/BLOCKS 130,000#. PULL T/150000# T/BREAK FREE @ CHEMICAL CUT @9319. & CIRC RU OTIS WL T/PULL CONTROL LINE. RIH PU 5" DP OFF RACK MW: 8.5 Seawater CIRC WHILE RIG UP T/PULL TBG & CONTROL LINE. LD HNGR, 63 JTS./5.5" TBG; CL; SSSV; 170 JTS OF 4.5" TBG;+i CUT-OFF PIECE; 3 GLM'S; 26 RUBBER CLAMPS; 5 SS TBG & GLM'S. NORM TESTED WHILE LAYING DOWN. LD TBG EQUIP. RU & TEEST BOPE 250/5000# & INSTALL WEAR BUSHING. MU BHA & RIH PU 5" DP OFF THE RACK. RIH W/MILL & PRT MW: 8.5 Seawater CONTINUE PICKING UP 5" DP OFF RACK. CIRC OVER FISH @ 9324. LATCH ONTO SAME & ATTEMPT TO RELEASE 'K' ANCHOR. CBU (GAS CUT @ BU). POH W/FISH. LD FISH-RECOVERED 1-GLM-SLIDING SLEEVE-2 JTS-CUT OFF JT & PBR SHEARED. REDRESS OVERSHOT & RIH W/6.5" SPIRAL GRAPPLE. WASH DOWN TAG FISH & RELEASE SAME F/PACKER. CBU (NO GAS). POH W/FISH-SLICK STICK & ANCHOR. MAKE UP MILLING TOOL & PRT & RIH. RIH W/WINDOW MILLING ASSY MW: 8.5 Seawater RIH W/PACKER MILL. TEST 9 5/8" CSG TO 3500 F/30 MINS. OK. MILL PACKER @ 9523' CBU-GAS BUBBLE OFF BOTTOM - SHUT IN & CIRC. OUT THRU CHOKE. HOLE TAKING 200 BPH FLUID-FILL PITS & WATER TANK-2.TRUCKS HAULING & STAND BY WHILE TRIPPING-LOSS SLOWED TO 100 BPH. POH W/PACKER. LD TRI STATE TOOLS-PACKER & TAIL PIPE. MAKE UP SECTION MILL & BHA-6 4 3/4" DC, S-29 3.5" HWDP. RIH W/SECTION MILL. WELL : E-24A OPERATION: RIG : DOYON 14 PAGE: 2 10/09/94 (5) TD:10735 PB:10692 10/10/94 ( 6) TD:10735 PB:10692 10/11/94 ( 7) TD: 9844' (9844) 10/12/94 (8) TD: 9895' ( 51) CBU AFTER CUTTING WINDOW MW: 9.1 Seawater FINISH RIH W/SECTION MILL. CUT & SLIP DRLG LINE. RIH TO TOP OF PERFS @ 10520' (WOULD NOT GO THRU PERFS). CIRC. MIX & PUMP LCM PILL (90 BBL). PULL UP TO 8627'. MONITOR FLUID LOSS (INITIAL RATE 30 BPH - FINAL. RATE NIL). RIH TO 9833'. DISPLACE HOLE W/MILLING FLUID. MILLING WINDOW IN 7" CSG. F/9839' TO 9889'. REVERSE OUT CMT @ 7" LINER TOP MW: 9.1 Seawater CIRC & PUMP SWEEP @ 7" WINDOW @ 9839' TO 9889' PUMP MILL OUT OF 7" CSG TO TOP OF 7" CSG @ 9567' (DRAG). CIRC & PUMP SWEEPS @ 7" LINER TOP @ 9567. POH W/6" SECTION MILL. (10% WEAR ON BLADES) LAY DOWN TOOLS. PICK UP 47 JTS 2 7/8" DSS TBG & RIH W/TBG & 5" DP. WASH & REAM THRU PERF F/10520' TO 10614' (SOLID). RECIPROCATE & CIRC @ 10600' (BATCH MIX CMT). PUMP 5 BBL WATER & TEST LINES TO 3000# FOLLOWED W/15 BBL WATER & 58 BBLS CMT 17# W/RECOMMENDED ADDITIVES. DISPLACE CMT W/153 BBL MUD. (CIP 0430). PULL 11 STANDS DP TO TOP OF LINER @ 9567. SQUEEZE 5 BBL CMT @ 2500# BLEED 2 BBL BACK. REVERSE OUT 10 BBL CMT & CIRC. PIPE CLEAN. DRILLING CMT T/9844 MW: 0.0 VIS: 0 REV. CIRC CLEAN PIPE OF CMT. POOH LD 105 JTS OF 5" DP. & 47 JTS. OF 2-7/8" TBG. WASH OUT BOPE & PULL WEAR BUSHING. PULL 9-5/8" PACKOFF *& INSTALL NEW PACKOFF. DIDN'T SEAT; DAMAGED SEALS. REPLACED W/NEW PACKOFF & TEST T/5000. INSTALL WEAR BUSHING. MU BHA & RIH. BREAK CIR. & TAG CMT @9573. AOGCC REP- (NAME NOT PROVIDED IN REPORT WITNESSED TAG OF CMT. DRLG CMT FT/9844 (FIRM). ATTEMPT T/KO MW: 0.0 VIS: 0 FINISH DRLG CMT T/9840. BEGIN K/O OUT OF WINDOW T/9895. BIT BEGAN T/TORQUE & MOTOR STALLED. FORMATION MAY HAVE CHANGED CLOSE T/BTTM OF WINDOW. POOH T/CHANGE BIT & RIH T/9849. WASH & REAM F/9849 T/9891. STOPPED @ WINDOW BTTM. PU T/9859 & TIME DRILL IN AN ATTEMPT T/K/O OF THE LOW SIDE OF THE HOLE @ 5'PH .... ALL INDICATIONS SHOW THE BIT @ TOP OF STUMP OF BTTM OF WINDOW. ATTEMPTING T/DRILL BY BUT WILL PROBABLY HAVE T/LAY A NEW KICK OFF PLUG. R£C£1Vrr-D ~;E(: 2 ?.. i994 Gas Cons. Commission Anchor~ ' WELL : E-24A OPERATION: RIG : DOYON 14 PAGE: 3 10/13/94 ( 9) TD: 9639' ( 0) 10/14/94 (10) TD: 9853' ( 214) 10/15/94 (11) TD:10083' ( 230) HOLD 2000PSI ON K/O PLUG MW: 0.0 VIS: 0 CONT. LO SIDE TIME DRLG F/9875 T/9893. COULDN'T GO FURTHER, NO TRQ INCREASE & NO INCREASE IN DIFF'TIAL ON MOTOR. POOH T/SET 2ND K/O PLUG. RIH W/3.5" M'SHOE. T/SET #2 PLUG. CBU @ 12BPM & 1800PSI. BATCH MIX CMT. PUMP 5 BBLS H20. TEST LINES.OK. PUMP ADDT'L 18.5 BBLS OF H20. 10 BBLS OF CMT & FOLLOW W/2.5 BBLS H20. DISPLACE W/RIG PUMPS & BAL. PLUG. ATTEMPT T/PULL OUT OF PLUG. PU WT PRIOR T/CMT=225K. BEGIN T/POOH. NO GO. PU T/350K. WORK DN. NO GO. CAN GO DN BUT NOT UP. WORK PIPE UP T/375K & BACK DN. BREAK CIRC DOWN W' STRING & GAIN ADDT'L 5' THEN STUCK AGAIN. ABORT CMT JOB. REV. OUT CMT. POOH T/LINER TOP @ 9567. CON'T REV. CBU THRU ANNUL. PREVENTER WHILE MOVING STRING. SMALL AMT OF RETURNS @ BU. WENT T/BTTM & KELLY UP. ROTATE @ 90-100 RPM. PUMP SWEEP. ANNUL VOL. F/TOL T/SURF=4773 STKS. OBTAIN CMT RETURNS @+/- 4800 STKS. CUTTINGS INCREASE F/4800T/5500 STKS. SHAKERS BLIND OFF. CBU A 2ND TIME. NO RETURNS ON BU. HOLE CLEAN. BATCH MIX AGAIN. PUMP 23.5 BBL H20. 10 BBL CMT. 2.5 BBLS H20. SPOT BAL. PLUG. PU WT BEFORE CMT 225K. POOH. 1 STND. PULL 275K W/TOP SINGLE OUT @25'. WORK DN. POOH NO PROB. PULL 3 STNDS. & ALL STNDS BREAK DRY. REV CBU @TOL 1.5 DP VOL. OPEN BAG & WORK PIPE. PU 225K SO 135K. PRESS UP ON PLUG T/2000. 46 STKS T/2000PSI. HOLD 1 HR. NO LOSSES. WILL WAIT 16 HRS BEFORE TAG PLUG. TIME DRLG F/K/O MW: 0.0 VIS: 0 HOLD 2000PSI ON K/O PLUG. CBU POOH LD 86 JTS. OF 5" DP. CHANGOUT MOTOR. ADJUST T/l-l/2 DEGREE. MU BIT & ORIENT. RIH. SLIP & CUT DL 59.5'. RIH T/TOL @9567 MD. KELLY UP. BREAK CIRC. WASH DN T/9678 & TAG SOFT CMT. CALCULATE TOC @9639. BEGIN DRILLOUT OF SOFT CMT T/9711 MD. TOW @9839. DIDN'T SEE BHA ENTER LINER TOP. CBU - SOFT CMT RETURNS ON BU. WAIT ON CMT. HELD SFTY MTG. TAG CMT @9711 & BEGIN T/DRILL. CMT FIRM. DRILLING 80-100 FPH. LAST 10' OF CMT WAS HARD. DRILL +/- 25 FPH W/20K. DRLG DN T/ 5' BELOW WINDOW @ 9844MD. TIME DRLG @5FPH FOR K/O. RIH W/BHA #4 (ROTARY ASS'Y) MW: 0.0 VIS: 0 CONTINUE TIME DRLG TO KICKOFF PLUG F/9853' MD TO 9889' MD AST 9.0. DIR DRLG F/9889' MD TO 10019' MD. AST 3.0 ART 1.5. DIR DRLG F/10019' MD TO 10080' MD. AST 2.0 1-1/2DEGREES ASSY FAILED TO BUILD ANGLE. PRETTY GOOD AT HOLDING TOOL FACE. SLIDING UP BUT LOSING ANGLE. DECIDE TO POOH F/CONVENTIONAL BUILD ASSY TO BUILD AND ROTATE THROUGH ZONE 3. CBU. NOTHING UNUSUAL ACROSS SHAKERS AT BOTTOMS UP. FLOW CHECK WELL. OK. STAND BACK KELLY. POOH F/BHA #4. CHANGE OUT BHA. MU BIT. RIH W/BHA #4. DEC, Oil & Gas Cons. Commission Anchor~. WELL : E-24A OPERATION: RIG : DOYON 14 PAGE: 4 10/16/94 (12) TD:10281' ( 198) 10/17/94 (13) TD:10335' ( 54) RIH W/BHA #5 MW: 0.0 VIS: 0 RIH TO SHOE. FILL PIPE. ATTEMPT TO CONT IN HOLE. STACKING OUT AT SHOE (9839' MD). ATTEMPT TO WORK THROUGH. NO GO. ATTEMPT TO WASH THROUGH. NO GO. BEGIN WASH/REAM. WASH/REAM FROM 9839' MD TO 10080' MD. PREVIOUS BIT PULLED 4/16" OUT OF GAUGE. ROTARY DRILLING F/10083' MD TO 10281' MD. ART 7.25 HRS. ASSY ONLY BUILDING AT +-2DGR/100' MD. DECIDE POOH F/BENT HOUSING MOTOR. CBU. FLOW CHECK WELL. OK. SET BACK KELLY. POOH F/BHA #5. PULL 10 STANDS. FLOW CHECK WELL. OK. FINISH POOH. CHANGE OUT BHA. TEST BOPE. OK. ATTEMPT DIR DRL F/10335' MD MW: 0.0 VIS: 0 RIH TO 10125' MD. TAKE 10K. RU TO WASH/REAM TO BOTTOM. WASH/REAM TO BOTTOM AT 10283' MD. TAKES 10K TO GET STRING MOVING. NO TORQUE INCREASE WHILE WASH/REAM. ATTEMPT TO SLIDE WITH HYCALOG DS71H PDC BIT. BIT WOULD NOT DRILL OFF VERY WELL WITH PLANNED WOB OF 5-20K. NEVER SAW ANY REACTIVE TORQUE GIVING TOOL FACE CHANGE AND NEVER SAW ANY DIFFERENTIAL PRESSURE WHILE SLACKOFF TO GET WEIGHT TO BIT. ROTATED SEVERAL TIMES. ROTATED OK. 40-60 FPH. COULD NOT EVER GET ASSY TO SLIDE OR STALL. ADD WEIGHT IN EFFORT TO GET DIFFERENTIAL. NO GO. AT END SLACKOFF UP 85K AND NEVER SEE ANY DIFFERENTIAL. WHENEVER PICKUP AFTER STACK WEIGHT PU CLEAN. DETRAILED RECAP OF RUN FAXED TO M. ZANGHI 0300 HRS. CBU. FLOWCHECK WELL. OK. SET BACK KELLY. POOH F/BHA #6 (ROLLER CONE BIT & 1-3/4DGR BH). PULL 10 STDS. FLOW CHECK WELL. CONTINUE POOH. C/O BIT AND MTR. MU NEW BIT AND MTR. BIT SHOWED CHIPPIN GLOCATED BEHING DIAMOND LAYER OF CUTTER. ALL TESTH WORN OVER TOPS OF CHIPS. GAUGE IN GOOD COND. 6 OF NINE JUNK SLOT AREAS PACKED OFF W/SHALE AND VERY SMALL CHIPS OF METAL DISPERSED IN SHALE. RIH W/BHA #6. ATTEMPT TO DIRECTIONAL DRILL F/10,335' MD. Gas Cons. commissio~ Anchor~ WELL : E-24A OPERATION: RIG : DOYON 14 PAGE: 5 10/18/94 (14) TD:10394' ( 59) CIRC HOLE CLEAN MW: 0.0 VIS: 0 CONTINUE ATTEMPT DIR DRILL F/10335' MD TO 10394' MD. UNABLE TO EVER EFFECTIVELY SLIDE. STRING CONTINUES TO STACK OUT. FLOW CHECK WELL. OK. SET BACK KELLY. POOH TO 9939' MD (100' BELOW TOP OF WINDOW) PUMP SVY. POOH TO 9889' MD (50' BELOW TOP OF WINDOW) PUMP SVY. CONTINUE POOH. FLOW CHECK WELL INSIDE WINDOW. OK. CONTINUE POOH LD 32 JTS DP. PULL MWD SOURCE. LD MWD, MU DMTR. XO, BIT. BIT HAD A PATTERN OF SCRATCHES CIRCUMFERENTIALLY AROUND THE LEG BACKS. SHOULDERS OF NOZZLE HOUSINGS HAVE WORN FLAT SPOTS. THE SCRATCHES AROUND THE BIT ARE FROM +- 1/16" DEEP AND SHINY TO JUST ON THE SURFACE AND BARELY VISIBLE. THIS IS WHY THE DULL CHARACTERISTIC ON THE BIT GRADE WAS "JD". MU PACKED ASSY FOR CLEANOUT TRIP. RIH W/PACKED ASSY. SLIP AND CUT DRLG LINE. CONT'D RIH TO JUST ABOVE WINDOW AT +-9800' MD. MU KELLY. PU WT 270K SO WT 165K. SLOACKOFF AND ENTER WINDOW WITHOUT ROTATE OR CIRC. ENTERS OK. SEVERAL KNOTS AS SLACKOFF. POOH. BEGIN WASH/REAM AT 80 SPM, 2500 PSI, 10-15K WOBo 1ST JT REAMED FEW SPOTS BEGIN TAKE WT BUT DRILL RIGHT OFF. NO VISIBLE TORQUE INCREASE BUT CAN HEAR ROTARY WORKING. PU 270-275K. SMOOTH SLACKOFF. MAKE CONNECTION. AT TOP OF SADLEROCHIT +-9956' MD TORQUE INCREASE AND GOES BETWEEN 320-340 AMPS. REAMING SLOWLS. KELLY DOWN. PU 265-285. WORK AGAIN. PU AND PULL OVER KNOT. WORK AGAIN. CLEANS UP. AT 010055' MD TOP STABILIZER COMING INTO WINDOW AND OVER HUMP. 320-360 AMP ALL WAY DOWN AND HAVING SLACKOFF LITTLE MORE WT (15K) TO REAM STEADY. PU AT KELLY DOWN SMOOTH AT 275K. REAM THROUGH AGAIN PRECAUTIONARY. AT TOP OF ZONE 3+-10118 TORQUE INCREASES AGAIN BETWEEN 320-360 AMPS. REAMINS SLOWS GAIN. KELLY DOWN. PU SMOOTH AT 275K. REAM AGAIN. FROM HERE ON DOWN ALL JTS REAMED ABOUT THE SAME. NO AREAS FROM HERE DOWN EXTREMELY TIGHT. AT +-5'F/TD WORK PUMPS INEFFORT TO FILL JUNK BASKETS IF NOT ALREADY FULL OF SAN D(SEVERAL TIMES). TAG BOTTOM W/5K, 10K, 15K. NO REAL INCREASE IN TORQUE NOTED. PU 285K AT TD. CBU. MIX AND PUMP SWEEP. Anchor~ WELL : E-24A OPERATION: RIG : DOYON 14 PAGE: 6 10/19/94 (15) TD:10612' ( 218) 10/20/94 (16) TD:10634' ( 22) 10/21/94 (17) TD:10197' ( 0) 10/22/94 (18) TD:10257' ( 60) PREPARE POOH F/PLUGBACK MW: 0.0 VIS: 0 CONT CIRC AND SWEEP HOLE ROTATING AT 60 RPM. PRIOR TO BU MANY SAMPLES TAKEN CONTAINED SAND/SILTSTONE W/INCREASING AMOUNTS OF METAL. JUST AT BOTTOMS UP ALOT OF WALLCAKE CAME OVER SHAKERS WHEN SWEEP BEGAN COMING OVERA LOT OF BIGGER PIECES OF METAL RETURNED. PUMPED ANOTHER SWEEP AFTER PLACING MAGNETS IN TROUGH. THIS SWEEP CAME BACK RELATIVELY CLEAN. FLOW CHECK WELL. OK. POOH 10 STDS. FLOW CHECK WELL. CONTINUE POOH. TRIP THROUGH OPEN VERY SMOOTH AND CLEAN. MU BIT AND ADJUST BH TO 2DEGR. MU MWD AND INSTALL SOURCE. CHANGE SLEEVE ON MTR TO 5-1/4" RIH W/BHA 08 KELLY UP. BENCHMARK SVY. WASH TO BOTTOM. NO PROBLEMS GOING THROUGH WINDOW. HOLE STILL VERY SMOOTH. DIR DRLG F/10394' MD TO 10612' MD. TOOK OFF SLIDING SLOWLY BUT IMMEDIATELY. NO PROBLEMS AT ALL STACKING OUT. NEEDED AN IMMEDIATE BUILD RATE OF 17DGR/100'MD. UNABLE TO ACHIEVE THAT IMEEDIATELY. AT 10394' MD BR .94. 1045 BR 9.63 10456 BR 16.29 10487-10547 CONSISTENT BR+- 17.5. UNABLE TO GET HORIZONTAL BEFORE INTO KAVIK SHALE. PLAN IS TO PLUGBACK. WOC MW: 0.0 VIS: 0 DRLG & SVYS F/10612-10635'. PICK UP & CHECK F/FLOW-PULL 10 STANDS & CHECK F/FLOW. POH TO PLUG BACK. LD BHA. SERVICE WEAR RING. PICK UP 38 JTS 2-7/8" TBG & 96 JTS 5" DP & RIH TO 10635. CIRC HOLE CLEAN WHILE BATCH MIXING CMT (12 BPM). PUMP 5 BBL WATER-TEST LINES TO 30003 PUMP 7 BBL. WATER 25 BBL CMT 2 BBL. WATER-DISPLACE CEMENT W/162 BBL MUD. POH 12 STANDS (SLOW). REVERSE CIRC. DP CLEAN. APPLY 6500 PRESSURE ON HOLE & HOLD F/3 HRS. POH F/ DRLG ASSY. PICK UP BHA 010 MW: 0.0 VIS: 0 POH-LD 117 JTS. 5" DP-38 JTS. 2-7/8" TBG. LD TBG. TOOLS & PU BHA 09. RIH TO TOP OF 7" LINER @ 9567'. CUT DRLG LINE. RIH TO 9916'- TAG SOFT CMT. DRLG SOFT CMT TO 10010' (CEMENT FIRM @ 10010 TO 10197). CIRC & RECIPROCATE HOLE CLEAN. POH TO LINER TOP @9567'. CBU. POH F/BHA 010. LD ROTARY ASSY & PU BHA 010. POOH F/NEW BIT MW: 0.0 VIS: 0 RIH W/BIT 010. DRILG F/10197 T/10238. ATTEMPT T/KO. MOTOR STALLED. CHECK F/FLOW & POOH T/SHOE. CHECK F/FLOW & POOH. HOLE IN GOOD CONDITION. PU NEW MUD MOTOR & INSTALL SOURCE. MU NEW BIT & RIH. WASH & REAM F/10144 T/10238. DRLG F/10238 T/10257. BIT IS STALLING & PU IS TIGHT. CBU. CHECK F/FLOW & POOH 10 STNDS. CHECK F/FLOW & POOH F/NEW BIT. .\..,~.~ Liii & Gas Co.S. oommiss'mn WELL : E-24A OPERATION: RIG : DOYON 14 PAGE: 7 10/23/94 (19) TD:10406' ( 149) 10/24/94 (20) TD:10660' ( 254) 10/25/94 (21) TD: 10795' ( 135) 10/26/94 (22) TD: 11209' ( 414) 10/27/94 (23) TD:11499' ( 290) 10/28/94 (24) TD:l1617' ( 118) POOH F/BIT CHANGE MW: 0.0 VIS: 0 POOH F/NEW BIT. CHANGE OUT BITS & ORIENT. RIH T/10247. WASH & REAM F/102476 T/10257. DRLG & SURV. F/10257 T/10406. NOT BUILDING ENOUGH ANGLE. CMU & CHECK WELL F/FLOW. POOH F/NEW BHA. CHECK WELL F/FLOW AFTER 10 STNDS. DRILLING MW: 0.0 VIS: 0 ADJUST MOTOR T/2 DEG. & MU BIT. PULL WEAR RING & TEST BOPE, CHK MANIFOLD & FLOOR VALVES. T/250/5000. LOWER KELLY VALVE/LEAKING-REPAIR WHILE RIH. INSTALL WEAR RING, MWD SOURCE & RIH T/SHOE. CUT DL. INSTALL & TEST LOWER KELLY VALVE T/5000. RIH T/10365. WASH F/10365 T/10406. DRLG T/10492. CBU. DRLG & SURV. F/10492 T/10554. CBU-DBL CHK FIGURES ON ANGLE & TVD. DRLG & SURVEYS F/10544 T/10660. BOPE TEST WAS WITNESSED BY JOHN SPAULDING W/AOGCC. DRILLING MW: 0.0 VIS: 0 DRLG & SURV. F/10660 T/10741. CBU CHK F/FLOW & PULL 10 STNDS. CHK F/FLOW & POOH F/NEW BHA. CHANGE BIT & BHA. RIH. KELLY UP & RECHK SURVEYS F/PREVIOUS RUN. DRLG & SURV. T/10795. POOH F/NEW BIT MW: 0.0 VIS: 0 DRLG & SURVEYS F/10795 T/11209. PULLING BIT F/HRS & PENETRATION RATE. CBU. OBSERVE WELL F/10 MIN. POOH 10 STANDS & OBSERVE F/10 MIN. POOH F/NEW BIT. HELD SFTY MTG WHILE CBU. DRILLING 6" HRZTL HOLE MW: 0.0 VIS: 0 HELD A 5MIN SFTY MTG W/EACH CREW.CONTINUE T/POOH F/BIT CHANGE. CHANGE OUT MWD SOURDE, BIT & ORIENT. SERVICE THE WEAR RING. RIH CHECK MWD @10246. CONTINUE T/RIH. DRILL 6" HORIZONTAL HOLE F/11209 T/11499. DRILLING 6" HRZTL HOLE MW: 0.0 VIS: 0 HELD 2) 5-MINUTE SAFETY MEETINGS CONTINUE DRILLING 6" HORIZONTAL HOLE F/11499 T/l1601. MOTOR FAILED. CHECK F/FLOW. POOH F/NEW MOTOR. HOLE IN GOOD CONDITION. CHANGE OUT MWD SOURCE, MOTOR ADJUST T/1 DEGREE, ORIENT TOOL & RIH. MWD CHECK SHOT @ 4200. FILL PIPE @8300. SLIP *& CUT DL 59.5'. CONTINUE T/RIH T/11541. REAM F/11541 T/l1601, 50' T/BTTM. CONTINUE DRILLING 6" HORIZONTAL HOLE F/l1601 T/11617. DEC 2 ?. Oit & Gas Co.s. commission Ar~chort WELL - E-24A OPERATION: RIG : DOYON 14 PAGE: 8 10/29/94 (25) TD:ll710' ( 93) 10/30/94 (26) TD:l1541' ( 0) 10/31/94 (27) TD:11710' ( 169) 11/01/94 (28) TD: 9840' ( 0) ATTEMP T/UNDERCUT HOLE MW: 0.0 VIS: 0 CONTINUE DRILLING 6" HRZNTL HOLE. TRYING T/KNOCK ANGLE DOWN T/GET BACK IN SAND. F/11617 T/l1710. DRILLING SHALE. PULL BACK UP T/l1500. MAD PASS W/MWD F/11450 T/l1510. LOCATE TOP OF SAND @11501. TRY T/UNDERCUT SAND SECTION F/l1500 T/11560. ANGLE 93.5 DEGREE & TRYING T/DROP. REAM T/DROP ANGLE MW: 0.0 VIS: 0 HELD A 5 MIN. SFTY MTG W/EACH CREWW. CONT. UNDERCUTTING 6" HRZNTL HOLE & DRILL T/TOTAL DEPTH OF 11710. W/BHA #16. TRYING T/UNDERCUT IN SAND SECTION F/l1501 T/665. UNABLE T/SLIDE ASSY EVENLY. CAN'T ST HOLE. CONDUCTED A 10 MIN FLOW CHECK. PULL BIT ON HRS. POOH & LD MOTOR. CHANGE MWD & MU NEW BIT ON BHA #17. RIH FILL PIPE & CHK MWD. RIH T/11533. TIME DRILL T/UNDERCUT 6" HOLE IN SAND SECTION. REAM 1 HR. PER FT. F/8 HRS @ 0 WT ON BIT. 90 RPM W/PENDULUM ASSY. TRY T/DROP ANGLE. ADJUST DDS TIME. CON'T T/REAM TRYING T/DROP ANGLE. HAVE LOST 43 BBLS DURING THE LAST 24 HRS. RU T/CMT MW: 0.0 VIS: 0 CON'T T/TRY T/UNDER CUT 6" HOLE IN SAND SECTION F/11542 T/11619. CON'T T/RUN OLD HOLE SURVEYS. UNABLE T/ST OLD HOLE. CONDUCT 10 MIN FLOW CHECK & POOH T/PLUG BACK. LD MWD STAND BACK BHA PU MULE SHOE & RIH OE. PU 22 JTS OF 3.5" DP. PU PLUG CATCHER AFTER 1 STND 5". PU 65 JTS OF 5" DP & RIH T/11700. BREAK CIRC. & COND HOLE WHILE RU T/CMT. POOH @ KOP MW: 0.0 ViS: 0 CONTINUE T/CIRC @11710. W/OE DP. WHILE BJ BATCH MIXED CMT. PUMP 20 BBLS WATER, 82 BBLS CLASS G CMT, DROP PLUG KICK OUT W/7 BBLS. WATER, DISPLACE W/RIG PUMP & SPOT 30 BBLS IN ANNUL. PULL 10 STNDS T/10770 & PUMP 19 BBLS. SHEAR OUT WIPER PLUG W/2500. PULL 16 STNDS T/9300. CIP @ 08:30 HRS. EST TOP OF CMT @9700' CBU @ 10BPM W/2000PSI. POOH LD 110 JTS OF 5" & 26 JTS OF 3.5". TEST BOP'S 250/5000. BAG T/250/2500. MANIFOLD T/250/5000. KOOMEY TEST ALL OK. INSTALL WEAR RING. PU 6" BIT #17 ON BHA #18 & RIH T/4200. TEST MWD. SLIP & CUT 59.5' DL. CONT. RIH TAG CMT @9656. 183' ABOVE 7" WINDOW @9839. CO FIRM CMT F/9656 T/9840. 1' PAST TOP OF 7" SECTION. CIRC HOLE CLEAN. ~-~.,%V.a (iil ~- G&s Cons. comm%ssion · Anchort WELL ' E-24A OPERATION: RIG : DOYON 14 PAGE: 9 11/02/94 (29) TD: 9862' ( 22) 11/03/94 (30) TD:10225'( 363) 11/04/94 (31) TD:10323' ( 98) 11/05/94 (32) TD:10623' ( 300) 11/06/94 (33) TD:10822' ( 199) 11/07/94 (34) TD:l1085' ( 263) KO PLUG @9840 MW: 0.0 VIS: 0 HELD A 5-MIN SFTY MTG. W/EA. CREW. LOST 0 FLUID IN 24 HRS. HIGH LINE POWER F/24 HRS. CONDUCT A 10-MIN FLOW CHECK @9840. POOH LD BHA. PU BIT #18. 2 DEGREE MOTOR ON KICK OFF BHA. RIH T/9840. KOP. FILL DP @ 4139 & CHK MWD. TIME DRILL & KICK OFF PLUG 40 DEGREE T/THE LEFT HIGH SIDE OF HOLE. 9840 - 9862. 7" SECTION F/9839 - 9889. TRIP IN HOLE MW: 0.0 VIS: 0 HELD A 5-MINUTE SFTY MTG W/EA. CREW. TIME DRLG & ROTATING F/9862 T/10225. CBU CHECK F/FLOW, SBK, PULL T/SHOE. CHECK F/FLOW @ BHA. POOH. CHANGE BHA T/ROTATING ASSY & TIH. CHANGE BTTM PIPE RAMS MW: 0.0 VIS: 0 TIH T/4140. SLIP & CUT DL. FILL PIPE & TEST MWD. TIH TAG TIGHT SPOT @9856. REAM F/10225 T/10325. SURVEY EA. JT F/10038 T/10225 T/CHK DIR. DRLG F/10225 T/10323. CBU. CHK F/FLOW SBK, PULL T/SHOE, CHK F/FLOW, POOH, CHK F/FLOW @ BHA. CHANGE OUT JARS PULL MWD PROBE & LAY DOWN 2 STABS. PULL WB. SET TEST PLUG. CHANGE BTTM PIPE RAMS. DRLG MW: 0.0 VIS: 0 BODY TEST BOPE, PULL TEST PLUG, INSTALL WEAR BUSHING. MAKE UP MTR, ADJUST TO 1-3/4DGR & ORIENT. RIH, TEST MOTOR @ 450, FILL PIPE @ 6800. KELLY UP @ 10275, WASH TO 10323. DRL & SVY TO 10623. TRIP IN HOLE MW: 0.0 VIS: 0 DRL & SVY F/10623-10822' CBU. 10 MIN FLOW CHECK. POH TO 10400'. KELLY UP, BREAK CIRC, MAD PASS W/MWD F/10400-10440' POOH. NO PROBLEMS THROUGH OPEN HOLE SECTION. CHAN~E BIT & MWD PROBE. CHECK MWD ORIENTATION. RIH 3 STANDS, PULSE TEST MWD. RIH TO 6000' (D-1 DRILL. SHUT IN TIME 60 SEC. HANDS IN PLACE 80 SEC.). FILL PIPE, SLIP & CUT LINE. TRIP IN HOLE. DRLG HORIZONTAL DRL & SVY F/10822-11085'. MW: 0.0 VIS: 0 DE.C, 2 ?. ~'~,s~c~ O'~ & Gas CoD~. fjommiss~on Anchor~- WELL : E-24A OPERATION: RIG : DOYON 14 PAGE: 10 11/08/94 (35) TD:11335' ( 250) 11/09/94 (36) TD:11687' ( 352) 11/10/94 (37) TD:11773' ( 86) 11/11/94 (38) TD:12240' ( 467) 11/12/94 (39) TD:12240' ( 0) 11/13/94 (40) TD:12240' ( 0) DRLG HORIZONTAL MW: 0.0 VIS: 0 CIRC HOLE CLEAN. CHECK FOR FLOW. POH. CHECK FOR FLOW @ SHOE & BHA. CHANGE BIT & SLEEVE. ADJUST MTR, ORIENT & INSTALL MWD PROBE. RIH, SHALLOW TEST MTR & MWD. FILL PIPE @ 4200 & 7900'. KELLY UP @ 11010. BREAK CIRC. REAM F/11015-11085'. NO PROBLEMS GETTING BACK TO BOTTOM. DIR DRLG & SVYS EVERY 15' F/11085-11335'. POOH MW: 0.0 VIS: 0 DRL & SVY F/11335-11687'. CIRC BOTTOMS UP. FLOW CHECK WELL. POOH. DRLG 6" HORIZ HOLE MW: 0.0 VIS: 0 CONT POOH FLOW CHECK AT 7" SHOE 9839' COMPLETE TRIP OUT W/NO PROBLEMS. PULL MWD PROBE, CHANGE BIT'S, ADJUST MTR TO 1-1/4DGR & ORIENT. PULL WESR BUSHING, INSTALL TEST PLUG & TEST BOPE, IVIANIFOLD 250-5000 PSI TEST HYDRILL TO 250-2500 PSI. TEST KELLY AND VALVES 250-5000 PSI, LOWER KELLY COCK FAILED, WILL REPLACE ELEMENT WHILE TIH, PULL TESTPLUG, RUN WEAR BUSHING. INSTALL MWD PROBE, RIH TO 4140' TEST MTR AND MWD. SLIP AND CUT 59.5' DRLG LINE. CONT TO RIH 7" SHOE @ 9839 TEST LOWER KELLY COCK 250-5000 PSI. O.K. FILL PIPE TEST MWD RIH TO 11,605' WASH & REAM F/11605-11687' (NO PROBLEMS). DRLG 6" HORIZONTAL HOLE DROP ANGLE SEAKING SAND. 11687-11773' TD 6" HORIZ MW: 0.0 VIS: 0 CONT DRLG & SVY 6" HORIZ. HOLE F/l1773-12240'TD. TOTAL SAND 579' THE BOTTOM 208' GOOD SAND. CIRC AND CLEAN HOLE. REAM 6" HORIZ HOLE MW: 0.0 VIS: 0 POOH FOR 6" HOLE OPENER, CHECK FOR FLOW, L/D 34 JT'S 5" DP. PULL MWD PROBE, L/D MWD, MOTOR AND BUMPER SUB, M/U BHA #7 6" HOLE HOLE OPENER, RIH FILL PIPE @ 6000' & 7" LINER TOP 9567' CONTINUE TO RIH STOPPED @ 10050' L/D 30 JT'S 5" DP RIH TO 10050' START REAMING @ 10050' REAMING ROUGH THROUGH HIGH BUILD DOG LEG'S TO 10862' AT 0600 HRS. SHOULD START REAMING BETTER SOON HOLE ABOUT HORIZ NOW. POOH TO RUN 5" LINER MW: 0.0 VIS: 0 CONT REAMING 6" HORIZ HOLE W/BHA #7 HOLE OPENER F/10862-12240' CIRC 8 BPM @ 3000 PSI AND WORK PIPE (DROP 5" DP RABBIT). POOH TO 7" LINER TOP @ 9567' HOLE IN GOOD CONDITION. SAW ONE BUMP AT 10650' 25K OVER PULL. CHANGE OVER TO SEAWATER @ 7" LINER TOP 9567' TO LOWER HYDROSTATIC 280 PSI TO RUN 5" LINER. CONT TO POH STAND BACK 87 STANDS 5" DP. Gas Con.~. Commission Anchor~ WELL : E-24A OPERATION: RIG : DOYON 14 PAGE: 11 11/14/94 (41) TD:12240' ( 0) 11/15/94 (42) TD:12240' ( 0) 11/16/94 (43) TD:12240' ( 0) RUN 5" LINER MW: 0.0 VIS: 0 CONT TO POOH L/D 5" HWDP. CHANGE OUT CYCLENDER ON IRON RUFFNECK. L/D 3-1/2" DP, HWDP & BHA #7, LOST ONE CONE OFF SECURITY HOLE OPENER, (LOOKS LIKE CAME OFF WHILE TRIPPING OUT, NO MARKS ON TOOL). P/U RR BIT #22 ON BHA #8, P/U 3-1/2" HWDP & DP, RIH TO PUSH CONE TO BOTTOM, WORK THROUGH TIGHT SPOT 10900'. POOH L/D 3-1/2" DP & HWDP BNA #8 (TIGHT SPOT 10900'). R/U AND RUN 2800' OF 5" 14.87# 13CR STL LINER TOTAL 51 JT'S OF 66 JT'S RUN. USING TORQUE COMPUTER, HAVE LAYED DOWN 4 JT'S DAMAGED JT# 55 PIN END ON MAKE UP AND DAMAGED 53 BREAKING OUT 54, DAMAGED 52 BREAKING OUT 53, ALL SHOWED PROPER MAKE UP ON COMPUTER. CO RUN F/5" LINER MW: 0.0 VIS: 0 2 STOP CARDS HANDED OUT. HELD 2 - 5 MIN. SFTY MTGS. CON'T T/RUN 5" SLT LINER. TOTAL OF 66 JTS. PU TIW 9-5/8 X 5" LINER TOP PKR & HNGR. CIRC TOTAL LINER VOL. 53.5 BBLS. RIH T/7" LINER TOP @ 9567 ON 5" DP. PUMP TOTAL PIPE VOL. 169 BBLS. CON'T RUNNING 5" SLT. LINER F/9567 T/12240. 6" OH F/9839 T/12240. STARTED DIFFERENTIAL STICKING @ 11800 ON EA. STAND. HAVING T/BREAK LOOSE COMING UP EA. TIME. CIRC. 6 BPM @ 1000PSI PIPE STUCK 5' OFF BTTM WHILE PUMPING. CON'T CBU TILL ALL MUD REMOVED F/ANNUL. STOP PUMPING & MOVE PIPE DOWN, STOPPED MOVING AFTER PUMP WAS RESTARTED. CBU WHILE BATCH MIX CMT. PUMP 70 BBLS 5% KCL H20 AHEAD OF CMT. TEST LINES T/4500 FOLLOW W/55 SX CMT FLUSH RAMPED WT F/Il T/ 13.5 PPG LEAD SLURRY, FOLLOW BY 240 SX TAIL SLURRY @ 15.7 PPG NEAT CMT. DROP DART KO W/5BBLS H20 DISPLACE W/RIG PUMP & FILTERED SEAH20, BUMP PLUG W/3500 PSI. CIP @ 19:00 HRS. ON 11/14. FLTS HELD OK. LINER TOP @ 9400 PLUG CATCHER @ 12153 SHOE @ 12240.SET LINER HNGR & LINER TOP PKR. REL. F/LINER HNGR. REV. OUT 20 BBLS CMT FLUSH & KCL WATER. POOH LD TOOL. PU 4-1/8 ECONO MILL, 5" CASG SCRAPER 12) 3-1/8" DC'S, 13 JTS 2-7/8" PAC DP. 65 JTS OF 2-7/8" 8.7# DSS TBG, &RIH POOH F/FAST FILL VALVE MW: 0.0 VIS: 0 CON'T RIH W/BHA #9 T/CLEAN OUT 5" LINER, TAG CMT @ 12138. CIRC & TEST 9-5/8" & 5" CASG T/3500/15 MIN. OK. CLEAN OUT 5" LINER F/12138 DRILL PLUG @ 12153. CO CMT T/12168. REV. CIRC & CHANGEOUT T/CLEAN FILTER SEAWATER W/6BPM @2300 PSI.POOH (SLM) STAND BACK 5" & 17 STD OF 2-7/8" DSS TBG. LD 14 JTS DSS. 13 JTS 32 7/8" PAC DP & 12) 3-1/8"DC. HELD SFTY MTG W/ATLAS WL ON RIG FLOOR BEFORE STARTING PU OF DP CONVEYED PERF. GUNS. PU 3-3/8" 4 SPF 60/120 DEGREE PHASING PERF. GUNS (714' OF SHOTS & 486' OF BLANKS) RIH ON 51 JTS OF 2-7/8" DSS TBG & 5" DP. TRY TO CLOSE HOWCO FAST FILL VALVE. POOH T/REPAIR. Oil & Gas Cons. Gommission Anchon WELL : E-24A OPERATION: RIG : DOYON 14 PAGE: 12 11/17/94 (44) TD:12240' ( 0) LAYING DOWN PERF GUNS MW: 0.0 VIS: 0 HANDED OUT 3 STOP CARDS & HELD 3 SFTY MTGS. CUT DL 52'. POOH T/FAST FILL VALVE. CHANGE OUT FAST FILL VALVE & BYPASS PORT SUB. BPPS LEAKED. RIH W/PKR & PERF GUNS. FILL PIPE @ 10082. TAG BTTM @12172. RU HOWCO T/TEST MANIFOLD & SET PKR W/BTTM SHOT @12150. SHOOT FL. LEVEL IN DP) (FLUID LEVEL @2220') HELD SFTY MTG. TEST LINES & MANIFOLD T/3000. PRESS ANNUL. T/2000. GUNS FIRED - CON'T PRESS ANNUL T/2500. FLOW TEST WELL F/30 MIN. MED BLOW IN BUCKET. SHOOT FL. LEVEL (FLUID @ 1380 - 840' INFLUX 14.5 BBLS) REV. OUT FL. W/OILY FL T/TEST TANK. LOSS RATE @70 BPH. ATTEMPT T/PULL PIPE-GUNS STUCK CLOSE ANNUL PREV. & BULLHEAD 35 BBLS. SEAWATER @ 8BPM. WASH SAND AWAY F/GUNS. POOH STAND BACK 50 STNDS. DP. LD REMAINDER 5" DP 2-7/8" TBG. & PERF GUNS. 11/18/94 (45) TD:10735 PB:12166 NIPPLE DOWN BOPE MW: 9.1 Seawater HANDED OUT 2 STOP CARDS & HELD 2 SFTY MTGS. LD PERF GUNS, ALL SHOTS FIRED. PULL WEAR RING. RU & RUN 231 JTS. OF 4.5" 12.6# L-80 ABM BUTTRESS TBG. MU TBG HNGR CONNECT CL & TEST T/5000. STING INTO 5" LINER TOP W/TBG TAIL & LAND TBG - RILDS. RU ON ANNUL. & REV. IN INHIB. T/PCKR. @ 9344. DROP BALL, SET PKR & TEST BACKSIDE T/3500#/30MIN & SHEAR RP VALVE. SET 2-WAY CHECK & NIPPLE DOWN BOPE. 11/19/94 (46) TD:10735 PB:12166 SIGNATURE: RIG RELEASED MW: 9.1 Seawater HAD A 35 GAL. GLYCOL. SPILL; CAMP GENERATER RADIATOR BLEW FULL OF SNOW & MOTOR OVERHEATRED-SPOUT BLEW OFF THE TOP & SPILLED 35 GAL ON GRAVEL PAD, DURING 40 MPH WINDS. NIPPLE DOWN BOP STACK-NU ADPTR FLNG. & TEST T/5000. OK. CLEAN UP 35-GAL GLYCOL SPILL. NU & TEST TREE T/5000. RU & PULL 2-WAY CHK. RU HOT OIL TRUCK & PUMP 145 BBLS DIESEL DOWN ANNUL & U-TUBE T/TBG. SET BPV & SECURE WELL. CLEAN MUD TANKS. RELEASE RIG @18:00 HRS ON 11/18. (drilling superintendent) DATE: s~ AY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-24A 500292176901 NORTH SLOPE COMPUTATION DATE: 11/28/94 DATE OF SURVEY: 111594 MWD SURVEY JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9835 8382.33 8317.00 9844 8389.10 8323.77 9897 8428.12 8362.79 9929 8449.66 8384.33 9960 8470.60 8405.27 38 37 S 24.30 W .00 3957.12S 1050.32W 38 37 S 24.23 W .51 3962.05S 1052.54W 47 4 S 17.60 W 17.99 3995.87S 1065.29W 47 53 S 12.30 W 12.52 4018.54S 1071.33W 47 4 S 12.40 W 2.66 4040.85S 1076.22W 4068.26 4073.47 4108.78 4132.10 4154.88 9988 8490.12 8424.79 10019 8511.50 8446.17 10050 8532.79 8467.46 10081 8554.35 8489.02 10112 8575.83 8510.50 46 44 S 13.50 W 3.04 4061.18S 1080.89W 46 27 S 12.90 W 1.67 4083.19S 1086.06W 46 13 S 12.70 W .88 4104.95S 1091.00W 45 55 S 13.60 W 2.31 4126.75S 1096.09W 45 23 S 13.47 W 1.75 4148.11S 1101.23W 4175.68 4198.21 4220.45 4242.76 4264.65 10143 8597.71 8532.38 10175 8619.77 8554.44 10207 8642.50 8577.17 10236 8663.39 8598.06 10266 8684.27 8618.94 45 29 S 13.02 W 1.08 4169.74S 1106.33W 45 28 S 13.40 W .86 4191.59S 1111.45W 45 6 S 13.72 W 1.34 4213.91S 1116.84W 44 58 S 12.09 W 3.93 4234.30S 1121.51W 45 37 S 12.14 W 2.19 4254.94S 1125.94W 4286.80 4309.16 4332.02 4352.88 4373.94 10292 8701.97 8636.64 10323 8722.88 8657.55 10354 8743.37 8678.04 10383 8761.76 8696.43 10414 8780.28 8714.95 46 25 S 11.24 W 4.01 4272.90S 1129.66W 48 30 S 11.79 W 6.85 4295.22S 1134.20W 49 27 S 8.73 W 8.01 4318.40S 1138.40W 52 13 S 6.42 W 11.30 4340.78S 1141.36W 55 38 S 4.11 W 12.38 4366.10S 1143.68W 4392.26 4415.01 4438.55 4461.12 4486.50 10445 8796.70 8731.37 10476 8811.70 8746.37 10507 8826.10 8760.77 10538 8839.82 8774.49 10569 8852.51 8787.18 60 20 S 3.58 W 15.24 4392.30S 1145.44W 61 57 S 2.12 W 6.64 4419.48S 1146.79W 62 46 S 2.32 W 2.67 4446.97S 1147.86W 64 32 S .59 W 7.61 4474.67S 1148.56W 66 49 S .67 E 8.28 4502.75S 1148.54W 4512 . 68 4539. 77 4567. 12 4594. 62 4622.39 10600 8864.24 8798.91 10631 8875.70 8810.37 10663 8887.45 8822.12 10691 8897.24 8831.91 10724 8906.87 8841.54 68 4 S 2.90 E 7.89 4530.98S 1147.65W 68 39 S 3.12 E 1.95 4559.82S 1146.14W 68 39 S 2.86 E .75 4589.84S 1144.57W 70 52 S 3.98 E 8.71 4616.34S 1142.98W 74 8 S 5.61 E 11.27 4646.80S 1140.43W 4650.19 4678.50 4707.97 4733.95 4763.70 10755 8914.66 8849.33 10771 8918.34 8853.01 10785 8921.03 8855.70 10803 8924.00 8858.67 10816 8925.66 8860.33 76 56 S 6.80 E 9.70 4676.85S 1137.16W 77 29 S 7.02 E 3.55 4692.95S 1135.20W 79 13 S 7.25 E 13.13 4705.86S 1133.59W 81 54 S 7.01 E 14.82 4723.64S 1131.37W 83 12 S 7.34 E 10.58 4736.19S 1129.78W 4792.95 4808.59 4821.13 4838.39 4850.57 SPF--~!Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 PRUDHOE BAY DRILLING PBU/E-24A 5oo2921769o1 NORTH SLOPE COMPUTATION DATE: 11/28 /94 DATE OF SURVEY: 111594 MWD SURVEY JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN 10833 8927.45 8862.12 10846 8928.57 8863.24 10869 8930.31 8864.98 10879 8931.10 8865.77 10897 8932.22 8866.89 85 0 85 27 85 37 85 44 87 1 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. S 6.49 E 11.34 4753.42S 1127.70W S 5.92 E 5.43 4766.74S 1126.25W S 7.24 E 5.90 4788.99S 1123.68W S 6.71 E 5.19 4799.32S 1122.42W S 6.74 E 7.25 4816.83S 1120.35W 4867.31 4880.28 4901.91 4911.94 4928.96 10910 8932.75 8867.42 88 13 10926 8932.95 8867.62 90 24 10941 8932.70 8867.37 91 34 10957 8932.23 8866.90 91 47 10973 8931.85 8866.52 90 53 S 6.81 E 9.36 4829.57S 1118.84W S 5.61 E 15.13 4845.92S 1117.06W S 6.56 E 10.36 4860.38S 1115.52W S 5.56 E 6.40 4876.29S 1113.83W S 6.85 E 9.79 4892.26S 1112.09W 4941.34 4957.26 4971.34 4986.82 5002.37 10988 8931.75 8866.42 11003 8931.86 8866.53 11020 8932.06 8866.73 11034 8932.17 8866.84 11051 8932.01 8866.68 89 52 89 22 89 8 90 1 91 1 S 9.14 E 17.08 4906.76S ll10.06W S 7.13 E 13.15 4922.35S 1107.83W S 8.15 E 6.48 4938.36S 1105.68W S 6.46 E 13.40 4952.50S 1103.87W S 7.57 E 8.59 4969.68S 1101.75W 5016.42 5031.51 5047.04 5060.75 5077.44 11067 8931.72 8866.39 11082 8931.47 8866.14 11098 8931.29 8865.96 11113 8931.18 8865.85 11128 8931.06 8865.73 91 6 90 48 90 27 90 20 90 37 S 6.11 E 9.32 4985.27S 1099.88W S 7.08 E 6.76 5000.24S 1098.15W S 8.24 E 7.72 5015.75S 1096.07W S 8.03 E 1.52 5031.49S 1093.82W S 8.08 E 1.89 5046.39S 1091.71W 5092.59 5107.14 5122.19 5137.43 5151.86 11144 8930.84 8865.51 90 57 11161 8930.59 8865.26 90 42 11176 8930.42 8865.08 90 40 11192 8930.24 8864.91 90 34 11208 8930.03 8864.70 90 55 S 7.96 E 2.29 5061.99S 1089.51W S 7.68 E 2.23 5078.66S 1087.22W S 7.66 E .27 5093.38S 1085.24W S 9.39 E 10.95 5109.02S 1082.89W S 8.41 E 6.56 5124.64S 1080.45W 5166.96 5183.12 5197.39 5212.52 5227.61 11224 8929.72 8864.39 91 17 11240 8929.27 8863.94 91 54 11255 8928.77 8863.44 91 54 11268 8928.36 8863.03 91 39 11286 8927.88 8862.55 91 26 S 8.64 E 2.66 5140.81S 1078.02W S 9.26 E 5.42 5156.79S 1075.51W S 8.72 E 3.64 5171.43S 1073.19W S 8.94 E 2.51 5184.56S 1071.15W S 8.07 E 5.05 5202.06S 1068.53W 5243.25 5258.69 5272.83 5285.52 5302.46 11302 8927.49 8862.16 91 21 11318 8927.11 8861.78 91 23 11332 8926.76 8861.43 91 21 11349 8926.35 8861.02 91 30 11364 8925.95 8860.62 91 28 S 7.66 E 2.66 5217.70S 1066.37W S 9.03 E 8.53 5233.59S 1064.04W S 8.51 E 3.62 5247.82S 1061.85W S 8.82 E 2.09 5264.10S 1059.37W S 9.42 E 3.94 5279.15S 1056.95W 5317.61 5332.99 5346.74 5362.48 5377.01 SP.'~-~ZY-SUN DRILLING SERVICES ANCHOP~AGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-24A 500292176901 NORTH SLOPE COMPUTATION DATE: 11/28 /94 DATE OF SURVEY: 111594 MWD SURVEY JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11380 8925.65 8860.32 11395 8925.45 8860.12 11411 8925.21 8859.88 11426 8924.95 8859.62 11442 8924.68 8859.35 90 38 S 10.22 E 7.12 5295.21S 1054.17W 90 49 S 8.20 E 13.36 5310.19S 1051.74W 90 57 S 9.74 E 10.07 5325.35S 1049.35W 91 1 S 9.70 E .46 5340.61S 1046.73W 90 54 S 8.05 E 10.24 5356.56S 1044.24W 5392.49 5406.96 5421.60 5436.32 5451.73 11457 8924.48 8859.15 11474 8924.37 8859.04 11489 8924.30 8858.97 11505 8924.24 8858.91 11520 8924.14 8858.81 90 34 S 7.94 E 2.29 5371.23S 1042.18W 90 13 S 9.00 E 6.81 5387.48S 1039.76W 90 16 S 9.48 E 3.18 5402.51S 1037.32W 90 10 S 8.92 E 3.62 5418.03S 1034.81W 90 34 S 7.95 E 6.84 5433.19S 1032.56W 5465.94 5481.66 5496.17 5511.16 5525.83 11537 8923.97 8858.64 11553 8923.77 8858.44 11568 8923.43 8858.10 11584 8922.88 8857.55 11600 8922.03 8856.70 90 31 S 8.80 E 4.95 5450.24S 1030.05W 91 1 S 8.92 E 3.34 5465.47S 1027.67W 91 30 S 8.83 E 3.23 5480.73S 1025.29W 92 30 S 8.42 E 6.88 5496.13S 1022.95W 93 31 S 8.26 E 6.36 5512.16S 1020.60W 5542.32 5557.04 5571.79 5586.67 5602.19 11616 8921.00 8855.67 11631 8920.02 8854.69 11637 8919.70 8854.37 11647 8919.24 8853.91 11662 8918.60 8853.27 93 52 S 7.11 E 7.54 5527.95S 1018.47W 93 25 S 7.66 E 4.66 5543.14S 1016.50W 92 49 S 7.64 E 10.33 5548.89S 1015.73W 92 38 S 9.28 E 17.01 5558.46S 1014.31W 91 59 S 9.86 E 5.49 5574.08S 1011.68W 5617.49 5632.23 5637.81 5647.07 5662.13 11678 8918.21 8852.88 11694 8918.00 8852.67 11709 8917.88 8852.55 11724 8917.84 8852.51 11740 8917.98 8852.65 90 57 S 9.59 E 6.92 5589.24S 1009.08W 90 29 S 10.60 E 7.04 5604.82S 1006.30W 90 24 S 11.12 E 3.33 5620.36S 1003.32W 89 54 S 10.14 E 7.66 5634.42S 1000.68W 89 8 S 10.99 E 6.96 5650.62S 997.66W 5676.75 5691.76 5706.69 5720.22 5735.80 11757 8918.41 8853.08 11771 8918.98 8853.65 11787 8919.66 8854.33 11803 8920.37 8855.04 11818 8921.10 8855.77 87 52 S 11.93 E 9.54 5666.75S 994.39W 87 37 S 10.62 E 9.24 5680.91S 991.57W 87 25 S 11.32 E 4.57 5696.53S 988.54W 87 21 S 11.95 E 4.09 5711.66S 985.42W 87 21 S 11.70 E 1.58 5727.12S 982.19W 5751.28 5764.87 5779.88 5794.39 5809.21 11834 8921.85 8856.52 11848 8922.60 8857.27 11864 8923.42 8858.09 11879 8924.16 8858.83 11896 8924.86 8859.53 86 56 S 11.57 E 2.81 5742.06S 979.11W 87 6 S 10.93 E 4.57 5756.17S 976.30W 87 6 S 11.47 E 3.32 5772.06S 973.16W 87 7 S 11.30 E 1.15 5786.43S 970.27W 88 3 S 10.98 E 5.93 5802.84S 967.03W 5823.54 5837.09 5852.35 5866.13 5881.89 SP?~-'~IY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 PRUDHOE BAY DRILLING PBU/E-24A 500292176901 NORTH SLOPE COMPUTATION DATE: 11/28/9 DATE OF SURVEY: 111594 MWD SURVEY JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/100 TOTAL RECTANGULAR cOOeD INATES NORTH/SOUTH EAST/WEST VERT. SECT. 11911 8925.32 8859. 11927 8925.65 8860. 11942 8925.94 8860. 11958 8926.22 8860. 11973 8926.51 8861. 99 88 34 S 10.48 E 4.65 32 88 56 S 10.11 E 3.41 61 88 55 S 9.25 E 5.50 89 88 58 S 9.96 E 4.62 18 88 55 S 9.41 E 3.54 5818.075 964.15W 5896.54 5833.165 961.41W 5911.06 5848.575 958.78W 5925.92 5863.765 956.21W 5940.58 5879.185 953.58W 5955.44 11989 8926.71 8861. 12004 8926.78 8861. 12020 8926.73 8861. 12035 8926.61 8861. 12051 8926.57 8861. 38 89 32 S 9.55 E 4.12 45 89 56 S 10.10 E 4.57 40 90 27 S 9.68 E 4.16 28 90 27 S 10.66 E 6.53 24 89 49 S 8.73 E 12.61 5894.405 951.04W 5970.12 5909.065 948.50W 5984.25 5924.905 945.73W 5999.52 5939.675 943.08W 6013.74 5955.565 940.37W 6029.06 12066 8926.73 8861. 12082 8927.01 8861. 12097 8927.33 8862. 12113 8927.65 8862. 12126 8927.88 8862. 40 88 58 68 88 53 00 88 46 32 88 53 55 89 8 S 8.36 E 5.94 S 9.70 E 8.72 S 10.48 E 5.14 S 11.20 E 4.69 S 9.17 E 15.24 5970.835 938.08W 6043.84 5986.045 935.66W 6058.53 6001.155 932.97W 6073.08 6016.435 930.04W 6087.76 6029.635 927.67W 6100.48 12157 8928.35 8863. 12187 8928.84 8863. 12239 8929.75 8864. 02 89 6 51 89 2 42 88 55 S 10.27 E 3.58 6059.935 922.48W S 10.62 E 1.16 6090.085 916.92W S 11.20 E 1.16 6140.305 907.24W 6129.69 6158.70 6206.96 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 6206.96 FEET AT SOUTH 8 DEG. 24 MIN. WEST AT MD = 12239 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 188.42 DEG. TIE IN POINT 9835.33' WINDOW POINT 9844' INTERPOLATED DEPTH 12239' SPI<=~.Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-24A 500292176901 NORTH SLOPE COMPUTATION DATE: 11/28/94 DATE OF SURVEY: 111594 JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 FT. OPEP~ATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9835 8382.33 8317.00 3957.12 S 1050.32 W 1453.00 10835 8927.61 8862.28 4755.20 S 1127.49 W 1907.72 454.72 11835 8921.92 8856.59 5743.20 S 978.88 W 2913.41 1005.69 12239 8929.75 8864.42 6140.30 S 907.24 W 3309.25 395.84 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. · SP~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 6 PRUDHOE BAY DRILLING PBU/E-24A 500292176901 NORTH SLOPE COMPUTATION DATE: 11/28/94 DATE OF SURVEY: 111594 JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 9835 8382.33 8317.00 3957.12 S 1050.32 W 1453.00 9952 8465.33 8400.00 4035.29 S 1075.00 W 1487.00 10097 8565.33 8500.00 4137.74 S 1098.75 W 1532.13 10239 8665.33 8600.00 4236.21 S 1121.92 W 1574.37 34.00 45.13 42.24 10389 8765.33 8700.00 4345.54 S 1141.84 W 1624.05 10603 8865.33 8800.00 4533.68 S 1147.52 W 1737.90 12239 8929.75 8864.42 6140.30 S 907.24 W 3309.25 49.67 113.85 1571.35 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS PRUDHOE BAY DRILLING PBU/E-24A ~ 500292176971 NORTH SLOPE COHPUTATION DATE: 11/28/94 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 9835 8382.33 8317.00 9844 8389.10 8323.77 10190 8668.30 8602.97 10206 8681.78 8616.45 10236 8706.01 8640.68 10270 8732.11 8666.78 10300 8755.53 8690.20 10332 8779.55 8714.22 10363 8802.63 8737.30 10395 8825.73 8760.40 10426 8847.82 8782.49 10457 8869.03 8803.70 10488 8888.01 8822.68 10519 8905.10 8839.77 10550 8920.58 8855.25 10582 8933.67 8868.33 10613 8944.02 8878.69 10644 8951.78 8886.45 10675 8956.83 8891.50 10705 8958.95 8893.62 10737 8958.19 8892.86 10768 8955.67 8890.34 10799 8952.67 8887.34 10829 8949.81 8884.48 10859 8947.13 8881.80 10891 8944.78 8879.45 10922 8942.68 8877.35 10953 8940.42 8875.09 10983 8938.14 8872.81 11015 8936.01 8870.68 11045 8934.49 8869.16 11076 8933.41 8868.08 11106 8932.28 8866.95 11137 8931.03 8865.70 11166 8929.63 8864.30 kY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE DATE OF SURVEY: 102894 MWD SURVEY JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 OPERATOR: BP EXPLORATION FT. COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 38 37 S 24.30 W .00 3957.12S 1050.32W 4068.26 38 37 S 24.23 W .51 3962.05S 1052.54W 4073.47 34 35 S .00 E 4.31 4159.91S 1097.12W 4275.72 35 24 S .70 W 5.44 4169.35S 1097.18W 4285.07 37 10 S 2.90 W 7.31 4187.13S 1097.74W 4302.73 40 20 S 3.60 W 9.59 4208.05S 1098.93W 4323.61 40 13 S 4.40 W 1.73 4227.85S 1100.32W 4343.40 41 50 S 4.10 W 5.09 4248.70S 1101.87W 4364.25 42 48 S 3.10 W 3.78 4269.67S 1103.19W 4385.19 42 34 S 2.60 W 1.32 4290.96S 1104.25W 4406.40 45 45 S 3.10 W 10.39 4312.39S 1105.31W 4427.75 49 52 S 4.50 W 13.45 4335.73S 1106.87W 4451.07 54 19 S 5.60 W 14.70 4360.02S 1109.03W 4475.41 58 21 S 8.70 W 15.51 4385.48S 1112.24W 4501.08 62 57 S 9.70 W 14.82 4412.67S 1116.65W 4528.61 67 53 S 8.90 W 15.84 4440.89S 1121.27W 4557.21 72 56 S 8.50 W 16.39 4469.66S 1125.67W 4586.31 77 55 S 8.80 W 16.17 4499.17S 1130.16W 4616.16 83 15 S 9.00 W 17.27 4529.31S 1134.88W 4646.67 88 37 S 10.60 W 18.69 4558.71S 1139.96W 4676.49 94 3 S 12.00 W 17.30 4590.52S 1146.31W 4708.89 95 19 S 12.50 W 4.38 4620.62S 1152.85W 4739.63 95 39 S 11.60 W 3.06 4651.07S 1159.35W 4770.70 95 24 S 11.10 W 1.88 4680.05S 1165.16W 4800.21 94 41 S 10.30 W 3.51 4709.80S 1170.79W 4830.47 93 48 S 8.90 W 5.22 4740.99S 1176.06W 4862.09 94 3 S 7.70 W 4.00 4771.20S 1180.47W 4892.63 94 19 S 7.20 W 1.83 4801.77S 1184.46W 4923.45 94 8 S 5.80 W 4.56 4832.35S 1187.95W 4954.22 93 43 S 4.00 W 5.93 4863.26S 1190.60W 4985.18 91 54 S 2.00 W 8.76 4894.03S 1192.21W 5015.85 92 10 S 1.80 W 1.13 4924.33S 1193.22W 5045.97 92 5 S 2.40 W 1.99 4954.75S 1194.33W 5076.23 92 33 S .10 W 7.58 4985.64S 1195.01W 5106.88 93 4 S .90 E 3.96 5014.04S 1194.81W 5134.95 MI 0 ~,~¢ 0i~ & Gas Conq. Commission Anchor; tY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-24A ST2 500292176971 NORTH SLOPE COMPUTATION DATE: 11/28 /94 DATE OF SURVEY: 102894 MWD SURVEY JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 11196 8927.98 8862.65 93 13 S 2.20 E 4.35 5044.03S 1194.00W 5164.50 11228 8926.25 8860.92 92 58 S 2.50 E 1.22 5075.91S 1192.69W 5195.84 11258 8925.06 8859.73 91 30 S 3.80 E 6.45 5106.35S l191.01W 5225.71 11289 8924.73 8859.40 89 41 S 4.80 E 6.63 5137.46S 1188.67W 5256.14 11321 8925.01 8859.68 89 19 S 5.10 E 1.51 5168.84S 1185.96W 5286.78 11352 8925.29 8859.96 89 37 S 4.00 E 3.63 5200.25S 1183.46W 5317.49 11384 8925.06 8859.73 91 13 S 4.00 E 5.04 5231.89S 1181.24W 5348.46 11415 8924.15 8858.82 92 7 S 4.70 E 3.64 5262.89S 1178.89W 5378.79 11448 8922.77 8857.44 92 44 S 5.20 E 2.45 5295.17S 1176.09W 5410.31 11479 8921.15 8855.82 93 10 S 5.60 E 1.86 5326.55S 1173.12W 5440.91 11511 8919.29 8853.96 93 30 S 5.50 E 1.08 5358.20S 1170.05W 5471.77 11542 8917.25 8851.92 93 56 S 5.60 E 1.47 5389.37S 1167.02W 5502.17 11573 8915.03 8849.70 94 21 S 5.00 E 2.36 5419.86S 1164.19W 5531.91 11605 8912.71 8847.38 94 3 S 5.80 E 2.71 5451.20S 1161.23W 5562.48 11636 8910.51 8845.18 93 59 S 5.00 E 2.54 5482.50S 1158.27W 5593.01 11668 8908.62 8843.29 92 43 S 6.10 E 5.19 5514.47S 1155.16W 5624.18 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5634.16 FEET AT SOUTH 11 DEG. 49 MIN. WEST AT MD = 11668 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 188.42 DEG. TIE IN POINT 9835.33' WINDOW POINT 9844' INTERPOLATED DEPTH 11668.77' .~Y-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE 3 PRUDHOE BAY DRILLING PBU/E-24A ST2 500292176971 NORTH SLOPE COMPUTATION DATE: 11/28/94 DATE OF SURVEY: 102894 JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9835 8382.33 8317.00 10835 8949.25 8883.92 11668 8908.62 8843.29 3957.12 S 1050.32 W 1453.00 4685.84 S 1166.30 W 1886.08 433.08 5514.47 S 1155.16 W 2760.15 874.07 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. tY-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/E-24A ST2 500292176971 NORTH SLOPE COMPUTATION DATE: 11/28/94 DATE OF SURVEY: 102894 JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9835 8382.33 8317.00 3957.12 S 1050.32 W 1453.00 9940 8465.33 8400.00 4017.15 S 1073.84 W 1475.13 22.13 10064 8565.33 8500.00 4088.18 S 1091.17 W 1499.05 23.92 10186 8665.33 8600.00 4157.86 S 1097.08 W 1521.12 22.07 10313 8765.33 8700.00 4236.12 S 1100.96 W 1548.27 27.14 10452 8865.33 8800.00 4331.51 S 1106.57 W 1586.68 38.42 11668 8908.62 8843.29 5514.47 S 1155.16 W 2760.15 1173.47 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SP' !Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING ~- PBU/E-24A ~ 500292176971 NORTH SLOPE COMPUTATION DATE: 11/28/94 DATE OF SURVEY: 102094 MWD SURVEY JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 9835 8382.33 8317.00 38 37 S 24.30 W .00 3957.12S 1050.32W 4068.26 9844 8389.10 8323.77 38 37 S 24.23 W .51 3962.05S 1052.54W 4073.47 10031 8543.66 8478.33 31 0 S 7.60 W 6.45 4063.90S 1083.13W 4178.69 10065 8572.18 8506.85 30 42 S 5.70 W 3.07 4080.82S 1085.11W 4195.72 10097 8599.56 8534.23 30 47 S 3.40 W 3.71 4097.05S 1086.40W 4211.97 10128 8626.13 8560.80 31 36 S 2.90 W 2.71 4113.12S 1087.28W 4227.99 10158 8652.10 8586.77 33 12 S 1.40 W 5.82 4129.59S 1087.89W 4244.37 10190 8677.99 8612.66 34 35 S .00 E 5.14 4146.98S 1088.10W 4261.61 10221 8704.06 8638.73 35 35 S 1.40 E 4.03 4165.30S 1087.88W 4279.70 10240 8719.20 8653.87 36 12 S 2.00 E 3.72 4176.26S 1087.55W 4290.49 10282 8752.34 8687.01 37 42 S 4.50 E 5.12 4201.14S 1086.13W 4314.89 10313 8777.43 8712.10 38 12 S 3.90 E 1.95 4220.65S 1084.70W 4333.99 10344 8801.63 8736.30 38 5 S 2.30 E 3.23 4239.63S 1083.67W 4352.61 10363 8816.32 8750.99 38 47 S .70 E 6.48 4251.29S 1083.36W 4364.10 10394 8840.12 8774.79 39 5 S 4.30 E 7.46 4270.50S 1082.52W 4382.98 10425 8863.77 8798.44 42 5 S 2.70 E 10.20 4290.73S 1081.29W 4402.81 10456 8886.03 8820.70 47 12 S 3.40 E 16.36 4312.69S 1080.12W 4424.37 10487 8906.15 8840.82 52 35 S 6.20 E 18.59 4336.49S 1078.10W 4447.61 10517 8923.09 8857.76 57 47 S 7.70 E 17.99 4360.69S 1075.14W 4471.12 10547 8938.14 8872.81 63 5 S 10.10 E 18.67 4386.90S 1071.02W 4496.44 10578 8951.61 8886.28 65 0 S 10.60 E 6.34 4414.13S 1066.04W 4522.65 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4541.03 FEET AT SOUTH 13 DEG. 34 MIN. WEST AT MD = 10578 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 188.42 DEG. TIE IN POINT 9835.33' WINDOW POINT 9844' INTERPOLATED DEPTH 10578.73' An~hO~: ' SP[ !Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 PRUDHOE BAY DRILLING PBU/E-24A ST 500292176971 NORTH SLOPE COMPUTATION DATE: 11/28/94 DATE OF SURVEY: 102094 JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9835 8382.33 8317.00 10578 8951.61 8886.28 3957.12 S 1050.32 W 1453.00 4414.13 S 1066.04 W 1627.12 174.12 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP'~ IY-SUN DRILLING SERVICES ANCHOtLAGE ALASKA PAGE PRUDHOE BAY DRILLING ~ PBU/E-24A ST 500292176971 NORTH SLOPE COMPUTATION DATE: 11/28/94 DATE OF SURVEY: 102094 JOB NUMBER: AK-MW-40082 KELLY BUSHING ELEV. = 65.33 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9835 8382.33 8317.00 3957.12 S 1050.32 W 1453.00 9938 8465.33 8400.00 4014.82 S 1072.37 W 1473.52 20.52 10057 8565.33 8500.00 4076.77 S 1084.70 W 1491.88 18.36 10174 8665.33 8600.00 4138.27 S 1088.09 W 1509.35 17.47 10298 8765.33 8700.00 4211.18 S 1085.36 W 1533.19 23.84 10427 8865.33 8800.00 4292.30 S 1081.22 W 1562.07 28.88 10578 8951.61 8886.28 4414.13 S 1066.04 W 1627.12 65.05 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS Memory Multi-Finger Caliper Log Results Summary Company: Log Date: Log No.' Run No.: r ~?~.J Desc:. Pirie2 Desc' Pipe2 Use BP EXPLORATION (ALASKA) INC. June 11, 2000 4113 1 4.5' i2=6 Jb~ BTRS Tubing ?.T: i~, ib~ CR'i3 Liner Well: Field: State: APl No.: Top Lo9 !ntvl1.: Bot. Log intvll.' 'i'o;'~, f eft lr!i',.;l?.: &,.:oi:. i_,::,f; in?IX.: E-24a Prudhoe Bay Alaska 50-029-21769-01 9,409 Ft. (MD) ':i,.'i.u~ i'-i. i ~l OOC l--l. (Vi!..)) Inspection Type- Sidetrack Candidate Tubing/Liner Inspection COMMENTS · This survey was run to assess the condition of the tubing with respect to corrosive and mechanical damages. The caliper recordings indicate that the 4.5" tubing is mostly in good to fair condition, with maximum corrosive penetrations in excess of 40% wall recorded in only 6 joints. No corrosive penetrations in excess of 50% wall are recorded throughout the interval logged. The interval of most severe corrosive damage recorded ( 30% - 50% wall thickness) runs between joints 134 and 190, from 5,400' to 7,600'. The damage appears in the form of isolated pits, tending to form in a line on the Iow side of the pipe. The distribution of the damage recorded throughout the tubing string is illustrated in the Caliper Overview page of this report. What appears to be a "slot" milled completely through the tubing wall, approximately 3.125" wide and 4.7' long is recorded at the very bottom of the tubing tail, through the Wire Line Entry Guide. Tool off-center motion through this interval indicates that the tubing is stabbed into the liner tie-back sleeve at an angle, with the "slot" appearing near the Iow side of the pipe, which also appears to be the outside of the "bend" between the tubing tail and tie-back sleeve. A cross-sectional drawing and 3D picture of this interval is included in the report. The 5" liner appears to be in good condition with no penetrations in excess of 12% wall thickness recorded. No significant ID restrictions or areas of significant cross-sectional wall loss are recorded throughout the interval logged. - MAXIMUM RECORDED WALL PENETRATIONS · Isolated Pitting (49%) Jt. 170 @ 6,851' MD Isolated Pitting (45%) Jt. 172 @ 6,937' MD Isolated Pitting (44%) Jt. 177 @ 7,136' MD Isolated Pitting (42%) Jt. 184 @ 7,409' MD Isolated Pitting (42%) Jt. 190 @ 7,629' MD MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS · No areas of significant cross-sectional metal loss are recorded throughout the 4.5" tubing logged, with the exception of the "slot" that appears to be milled in the end of the tubing tail. ~;, ~" TaJB~~'-~;¢'~ - MAXIMUM RECORDED ID RESTRICTIONS · No significant ID restrictions due to deposits or pipe deformity are recorded throughout the 4.5" tubing inspected. .... ~ ~'~':~ - MAXIMUM RECORDED WALL PENETRATIONS ' No penetrations in excess of 12% wall thickness are recorded throughout the interval of 5" liner logged. ¥- L~i-~ - MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS ' No areas of cross-sectional wall loss (>6%) are recorded throughout the interval of 5" liner logged. ~'~ L~2~F~ - MAXIMUM RECORDED ID RESTRICTIONS ' No significant ID restrictions, in excess of 0.07 inches, are recorded in the interval of 5" liner logged. !Field Engineer' J. Morgan Analyst: J. Burton Witness: Steve Farris PDS Caliper Overview Body Region Analysis Well: E-24a Survey Date: June 11, 2000 Fie~d: PRUDHOE BAY Tool Type: MFC40 No. 00432 Company: BP EXPLORATION (ALASKA) INC. Tool Size: 2 3/4" Country: USA No. of Fingers: 40 Analysed: ). Burton Tubing: Size Weight Grade & Thread Nom. OD Nom. ID Nom. Upset 4.5 ins 12.6 ppf b80 BTRS 4.5 ins 3.958 ins 4.5 ins Penetration and Me~al Loss (% wall) ~ penetration body ~¢~ metal loss body 0to I to 10to 20 to 40 to above 1% 10% 20% 40% 85% 85% N umber of joints analysed (total = 246) Pene 1 129 62 48 6 0 Loss 88 158 0 0 0 0 Damage Configuration ( body ) 1 O0 60 4O isolated genera[ l[ne grig hole / poss Number of }oints damaged (total = 106) 93 0 13 0 0 Damage Profile (% wall) ~ penetration body ~:~ metal loss body 0 5O 0 49 96 GLM 3 143 GLM 2 GLM 1 Bottom of Survey = 232 100 Analysis Overview page 2 3 1/8" Wide "Sbt" Recorded in Bottom of 4.5'~ TTL BP E×p]oradon Maska ?~:'udhoe Bay We~i: Ed4a Date: ~u~'~e i t, 2000 XN-Nipple @ 9,397' elmd -- -- Top of "Slot" @ 9,404' eJmd 4.5" WLEG @ 9,409' eJmd Tie-Back Sleeve (5" ID) Top of 5" 15¢ 13CR Liner @ 9,415' eJmd 15# 130R Liner PDS CA ER JOINT TABULATION Pipe: 4.5 ins 12.6 ppf L-80 BTRS Wall thickness. Body: 0.271ins Upset- 0271 Nominal ID: 3.958 ins Upset inches ins Welt: Field: Company: Country: USA Date: June 11, 2000 ,o6[ E-24a PRUDHOE BAY BP EXPLORATION (ALASKA) IN C.~;~/;/penetration body ~?; metal loss body Minimum inches 3.83 PUP 3.82 PUP 3.84 3,84 3.87 3,88 3.85 Line shallow corrosion. 3.83 3 3.85 3.84 3.87 3.85 3.83 383 3.84 3.86 3.89 3.90 Line corrosion, 3.88 3.86 3.84 3.87 3 85 3.85 Line shallow corrosion, 3.88 3.86 3.86 3.86 3.90 3,88 3.87 3.89 3.88 3.91 3.88 3.86 3,88 3.89 3.86 3.87 3.89 3.88 3.89 3.89 3.91 3,90 3,90 3.88 3.90 1Damage profile wall) 50 1 O0 Pipe Tabulations page I PDS CAL~R JOINT TABULATION SH~ Pipe: 4.5 ins 12.6 ppf L-80 BTRS Well: Wall thickness. Body: 0.271ins Upset = 0.271ins Field: Nominal ID: 3.958 ins Company: Country: Date: E-24a PRUDHOE BAY BP EXPLORATION (ALASKA) INC4~4~ penetration body USA ~ .~:~ metal loss body June [ 1, 2000 pint Penetration I Metal Projection Minimum Damage profile No. Upset Body Loss Upset Body tD Comments (% wall) inches inches % % inches inches inches 3 50 10C 49 [ 0 ,02 7 2 0 .06] 3.89 50 0 .02 7 2 0 .06 3.89 -- 51 0 .03 101 2 0 0 3.88 52 0 .01 5 I 0 I .08 3.86 53 I 0 [ .01 3 2 [ 0 .05 3.90 53.1 0 J .02 6 1~ 0 ,06 3.89 PUP 53.2 0 ] 0 0 0 0 0 3.89 SSSV Assr. 53.3 0 } .00 2 1 0 0 3.89-] PUP 54 O[ .01 5 1 0 .051 3.89 I 55 0 [ .02 6 2 0 .06 3.90 ~ 56 t 0 ' .02 7 2 0 .06 ~1' 57 0 .021 7 i 0 ~ 3.87 58 0 .0~_ 6 1 0 .0_6. 3.88 59 0 .02 3 0 .05 3.90 60 0 .01 6 2 0 .05 3.90 61 0 .01 ~ 1 O .06 3.89 62 0 .02 2 0 .06 3.90 63 0 .01 2 ( 0 .07 3.87 64 0 .03 1C 3] 0 i .05 3.90 65 0 .01 1 0 ,05 3.90 66 0 .02 1 0 .05 3.90 J 67 0 .02-1 I 0 .os 3.89 68 0 .02 2 0 .06 3.86 69 0 .01 I 0 .05 3.91 70 0 .02 l 0 .06 3.89 71 0 .02 I 0 .05 3.90 72 0 .01 t 0 .06 3.90 73 0 .04 1~ 3 0 --'.06~ 3.89 Line shallow corrosion. 74 0 .92 1 0 .0__71 3.88 - ~a 0 .02 2 0 .06 3.89 I 76 0 .05 18J 4 ---0 0 3.91 Line shallow corrosion. 77 0 .03 10 I 0 .06 3.89 78 I 0 .03 l0 2 0 .05] 3.90 ~-9 I 0 .021 9 2i 0 .05 3.90 80[ 0 .021 8 1 0 .05 3.90 81 I 0 .02} 9 2 0 .05 3.90 82 0 .02 8 3 0 .07 3.87 ~83 0 .03 11 3 0 I 0 3.90 84 0 .02 7 1 0 I .05 3.88 85 0 .02 9 / 0 0 3.89 86 0 I .03 _9_ 3 0 0 3.90 ~.8_7 0] .02 9 2 0 .05 3.90 88 0 ~ .02 6 1 0 .0~ 3.88 8~_9 0 I .03 10 3 0 --- .05 3.89 90 0 .03 _ 11 I 0 0 3.89 _91 0 .03 11 I O_ i '05 3.91 . 92 0 .03 12 2 0 ,05 3,90 Shallow pitting. 93 0 .03 ] 1 1 0 0 3.87 94 I 0 .031 13 3 i 0 0 3.91 Shal[owpitting= 95 0 .02 E 2_ 0 [- .06 3.89 Pipe Tabulations page 2 PDS CA ER JOINT TABULATION Pipe: 4.5 ins 12.6 ppf [-80 BTRS Welt: Wall thickness. Body: 0.271ins Upset = 0.271ins Field: Nominal ID: 3.958 ins Company: Country: Date: l'-24a PRUDHOE BAY BP EY, PLORATION (ALASKA) INC.~f?~ penetration body USA ~,;~? metal loss body June 11, 2000 Joint [ Penetration Metal Projection J Minimum Damage profile No. Upset Body Loss Upset Body ID Comments (% wall) inches inches % % inches inches inches $0 10C 96 0 .03 / t 4 0 .04 3.89 97 i 0 .02 8 2 0 -] 0 3.87 98 ! 0 j .03 12 2 0 0 3.91 tShallowpiilJng. 99 0 ] .04 13 2 0 0 3.91 IShallow pitting. 1 O0 0I .03 l 0 2 0 0 [ 3.87 101 0 [ .03 13 2 0 .05 3.89 Shallow pitting. ~2 I 0[ .04 15 2 0 ] 0 3.90 Shallow pitting. 103 I 0 .03 11 2 0 .05 3.90 Shallow pitting. 104 t 0 .03 li 2 0 .07[ 3.88 105[ 0 .03 12 2 ~ 0 .04[ 3,90 Shallow pitting. ~ ' 106 0 .03 10 3 0 I .06[ 3.87 107 0 .04 13 2 0] 0 3.90 Shallow pitting 107.1 0 .04 1___5_ 1 0 0 3.82 PUP Line shallow corrosion. 107.2 0 0 0 0 0 0 3.80 GLM 3 (LATCH @ 7:00) 107.3 0 .03 9 I 0 .0~ 3.80 PUP 108 0 .03 11 4 0 0.09 3.90 109 0 .03 12 3 0 3.86 Line shallow corrosi_on. 110 0 .03 11 3 0 .06 3.88 11 I 0 .03 13 3 0 .05 3.89 Shallow pitting. 11~2 0 I .04 16 2 0 0 3.89 I Shallow pit~i~ng. 113 0 .03 10 4 0 .06 3.8__9__  14 0 .04 15 2 0 0 3.92 lSha]low pitting. 15 0 .05 17 ;~ 0 0 3.91 [ Shallow pitting. 16 0 .03 12 3 ! 0 .03 3.89 1Shallowpitting. 17 0 .05 18 2 0 [ .02 3.90 Shallow pitting. 118 0 .03 12 2 0 ! .05 3.90 Shallow pitting. 119 0 .05 20 3 0 0 392 Shallow pitting. 120 0 -- .05 18 2 0 0 3.91 Shallow pitting. 121 0 .03 12 2 0 .03 3.88 Shallow pitting. 122 0 .07 27 t 0 0 ~."~ t isolated pitting. _ -'-__ f23 0 .06 21 2 0 0 3.91 Isolated pitting, 124 0 .06 2J 2 0 0 3.91 Line corrosion, 125 0 .08 2~ __3 0 0 3.90 Isolated pitti_ng. 126 0 .05 I~ 4 0 .06 %87 Shallow pitting. 127 0 .06 22 4 0 .04 3.91 Line corrosion. t28 0 .05 1~ 4 0 0 3.90 Shallow pKtin~__ 129 0 .02 __ 3 -- 0 0 3.89 130 _~) .06! 22 3 0 .04 3.91 Li~ecorrosion. 131 0 .0829 2 0 0 3.9t ! Line corrosion. 132 0 [ .04 16 3 0 .06 3.88 Shallow pitting. 133 0I _ .04 [ 1~5 3 0 .05 3.90 Shallow pitting. 1_~4 0 .08I ~ 2 0 0 3,91 isolated pitting~ la5_ 0 .08 30 I 0 [ 0 3.91 Isolated pitting. 13~_6 0 .06 21 3 0I O_ 3.91 Isolated pitting. 137 0 .03 10 t 0 0 3.91 138 0 ~06 22 4 0 .05 3.89- Line corrosion. 139 0 .06_ 23 3 0 .03 3.90 Isolated pitting. 140 0 .06 24 4 0 [ 0 3.87 Isolated pitting. 141 0 .08 29t 1 0[ 0 3.87_ Isolated pitting. 142 0 .0.8 _31! 2 0 [ 0 3.92 Isolated pitting. Pipe Tabulations page 3 PDS CAL R JOINT TABULATION Pipe: 4.5 ins 12.6 ppf b80 BTRS Well: Wallthickness. Body: 0,271ins Upset=O.271ins Field: Nominal ID: 3.958 ins Company: Country: Date: E-24a PRUDHOE BAY BP EXPLORATION (ALASKA) [NC.~ penetration body USA ¢¢;;~¥ metal loss body June 11, 2000 Joint Penetration J Metal Projection Minimum I Damage profile No. Upset Body Loss Upset Body ID Comments (%wall) inches inches % % inches inches inches ) 50 10C -143 I 0 .06 23 2 0 .03 3.89 isolated pitting. ~44[ 0 .05 17 4 0 .04 3.89 Shallow pittin8, 145 [ 0 .05 18 3 0 0 3.91 Shallow pitting. 146 0 .05 17 ? 0 0 3.92 Shallow pitting. 147 0 .07 25 2 [ 0 0 I 3.88 Isolated pitting. - 3,92 Isolated pitting. 148 0 .07 27 1 0 0 149 0 .09 34 2 0 0.06 3.91 Line conosion. 150 0 .08 28 3 0 3.88 Isolated pitting. 1510 .09 32 I 0 i I 3.92 Isolatedpittin~- 152 0 .05 20 3 0 3.91 Shallow pitting. 153 0 .05 20 4 0 3.92 Shallow pitting. - 154 0 .07 26 3 0 0 3.90 Isolated pitting. 155 .07 .07 26 2 0 0 3.91 Isolated pitting. 156 0 .06 23 2 0 0 3.92 Isolated pitting. 157 0 .07 25 3 0 0 3.90 Isolated pitting. 158 0 .08 28 3 0 .03 3.89 Isolated pitting. 159 0 ~06 21 3 0 i 0 3.90 Isolated pitting. 160 0 .09 34 2 0 0 3.92 isolated pitting. __ 161 0 .06 21 2 0 0 3~90 Isolated pitting. 162 0 ~ .08 28 2 0 0 3.92 Isolated pitting. 163 0 .07 2~ 1 0 0 3.93 Isolated pitting. 164 .08 .11 40 3 0 0 3.90 Isolated pitting. 16.~ I 0 ,10 37 2 0 0 3,91 Isolated pitting. 166 0 .08 31 2 0 0 3.9/ Isolated pittiug. 167 O_ .03 lC 2 0 0 3.93 168 0 .07 2~ 2 0 0 3.92 isolated pitting. 1~69 0 .09 32 / 0 0 3.94 !Isolated pitting. 170 0 .13 49 I 0 0 3.93 Isolated pitting. 171 0 .10 37 3 0 0 3.93 Isolated pitting. 172 ! .10 .12 45 2 0 0 3,92 Isolated pitting. 173 0 ! .09 32 2 0 0 3.93 Isolated pitting. 174 .06 .02 7 2 0 0 3.91 Pitting in upset. 1~F5 .I0 .11 40 2 0 0 3.93 Isolated pitting. 176 0 .09 35 I 0 0 3.91 Isolated pitting: 177 .08 .I 2 44 2 0 0 3.92 Isolated pitting. 178 0 [ .10 38 4 0 0 3.92 Isolated pitting. 179 0 .07 27 3 0 0 3.93 Isolated pitting. [ 8~0 0 .02 6 3 0 0 i 3.90 181 ! 0 .05 17 2 0 0 3.91_ Shallow pitting. 182 .09 .08 31 1 0 0 3.92 Isolated pitting. 183 0 .11 41 3 0 0 3.93 Isolated pitting. 184 0 .1 I 42 1 0 0 a. _3 Isolated pitting. '1_85 0 .09 35 2 0 0 3.93 Isolated pitting. 186 0 .02 6 2 0 0 3.90 187 0 .09 32 3 0 I 0 3.90 Isolated pitting. _ 188 0 .08 3(} 1 -0 0 3.94 Isolated pitting. -- 189 0 .03 12 1 0 0 3.94 Shallow pitting. 1_90 0 .12 42 3 0 0 3.91 Isolated pitting: 191 0 .06 22 I 0 0 3.91 Isolated pitting. 191.1 0 .01 5 1 0 0 3.90 PUP Pipe Tabulations page 4 PDS C JOINT TABULATION Pipe: 4.5 ins 12.6 ppf L-80 BTRS Welt: Wall thickness. Body: 0,27lins Upset = 0.271 ins Field: Nominal ID: 3~958 ins Company: Country: Date: E-24a PRUDHOE BAY BP EXPLORATION (ALASKA) INC.~F~:~ penetration body USA ~:,(~: metal loss body June 11, 2000 -Joint Penetration MetalI Projection Minimum I Damage profile No~ Upset Bodv Loss Upset [Body ID Comments (% wall) inches inche_s~1% % inchesJinches inches 50 10( 191.2 0 I0 I C 0 0 0 [ 3.87 GLM 2 (LATCH @ 3:00) 191.3 0 I .02 9 1 0 .03 3.87 PUP 192 0I .04 13 1 0 0 3.92 Shallow pitting. t93 0 [ .03 12 I 0 [ 0 3.93 Shallow pitting. 194 0 .01 z 1 0 0 I 3.93 195 0 .06 21 1 0 0 3.94 Isolated pitting. 196 0 .05 2C 3 0 0 3.95 Shallow pitting. 197 0 .04 15 2 0 0 3.95 ] Shallow pitting. 198 0 .04 15 1 0 0 3.93 Shallow pitting. 199 0 .05 [ 1 0 0 3.93 Shallow pitting. ~ I 200 0 .05 18 I 0 0 3.94 I Shallow pitting. 201 0 .03 10 1 0 0 3.94 I 202 ' 0 .03 12 / 0 0 3,94_ Shallow pitting. 203 I 0 .03 10 1 0 0 3.94 .03 l0 I 0 0 3.94 204 0 .~05 0 ... .02 8 1 0 0 3.93 206 0 .03 11 1 0 0 3.94 207 0 .02 6 1 0 0 3.95 208 [ 0 .01 4 I 0 0 3.92 209 0 .02 6 2 0 [ 0 3.95 210 0 .01 4 1 0 I 0 3.94 211 - 0 ,02 6 1 0] 0 3.95 212 0 .03 1 l 1 0 0 3.94 Shallow pitting. 2 t3 0 .04 13 1 0 0 3.94 Shallow pitting. 214 0 .01 4 1 0 0 i 3.95 215 0 .02 7 2 0 0 [ 3.96 216 0 .03 13 I 0 0 3.93 Shallow pitting. 217 0 ,04 14 6 0 .03 3.92 Shallow pitting. 218.. 0 .04 16 1 0 0 3.96 Shallow pitting. 21~? O .01 3 1 0 0 3.94 [220 0 .02 fi 4 0 0 3.94 221 0 .04 13 4 [ 0 .04 3.93 Shallow pitting. 222 0 .02 8 3 0 i 0 3.93 2_a 0 .02 c 1 0 0 3.95 224 0 .01 1 0 0 I 3.96 2~2.5 0 .01 4 0 0I 3.92 226 0 .02 2 0 0 [ 3.95 227 I 0 .0l 1 0 0[ 3.95 228[ 0 .01 1 0 0 [ 3.92 ~8.1 [ 0 [ .02 7~ I 0 0 3.84 PUP ~T28.2' 0I 0 0 O_ 0 3.89 GLM I {LATCH @ 12:00) 228.3 0 ~ .01 4 3 0 0 3.89 PUP 229 _0[ .02 4 0 I 0 3.93 230 0 .02 j ; i 1 0 I 0 3.95 231 0 .01 4 3 0 0 3.92 [ 231.1 0 .0i 4 1 0 0 3.95/pup 231.2 0 0 0 0 0 0 3.82 X-Nipple 231.3~ 0 [ .01 3 1 0 0 3.97 PUP 23,. 1 0 I .0, 0 0 3.93 __ Pipe Tabulations page 5 PDS CAL R JOINT TABULATION SI Pipe: 4.5 ins 12.6 ppf L-80 BTRS Well: Wallthickness. Body:0.271ins Upset=0.271ins Field: Nominal ID: 3.958 ins Company: Country: Date: E-24a PRUDHOE BAY BP EXPLORATION (ALASKA) INC.~t~; penetration body USA ~:~ metal loss body June 11, 2000 Joint Penetration Metal Projection Minimum I Damage profile No. Upset Body Loss Upset Body ID Comments (% wall) inches inches % % inches inches inches __ 0 50 _al .6 0 .02 8 1 0 .03 3.94 PUP 231 8 0 .01 1 0 0 3.96 PUP ~ °I °1° 232 ~ 0 .32 100 35 0 ~ 0 3.93 ~U~W[~G ~.~ ~ Damage Classifications Penetration / projection class, in order of damage severit~ Hole - penetration exceeds 85% of nominal wall thickness Ring - damage area exceeds 75% of circumference, but depth iange does not exceed I ~ pipe ID Line - damage depth range exceeds 5 * pipe ID, but extends less than 22% of circumference General - damage depth range exceeds 1 * pipe [D and/or extends more than 22% of circumference Isolated - damage depth range does not exceed 5 * pipe ID or extend more than 22% of circumference Damage reporting threshold - 30 thou inches deviation in body, 50 thou in upset. Modal line length - 0.800 feet. Pipe Tabulations page 6 Well: E-24a Field: PRUDHOE BAY Company: BF' EXPLORATION {ALASKA) INC, Country: USA Tubing;: 4.5 ins /2.6 ppi' L-80 BTRS PDS Caliper Sections Survey Date: Juae 11, 2000 Tool Type: MFC40 No. 00432 Tool Size: 2 3/4" No. of Fingers: 40 Analysed: J, Burton Cross section for Joint 232 Tool speed = 66 Nominal ID = 3.958 Nominal OD = 4.500 Rernaining wall area = 64 % Tool deviation = 45 ° at depth 9403.61 ft Finger 1 Radius: 2.282 ins Approx, 3.125 h~. wide slot recorded in bottom 4.7 Ft, o1' Tubing Tail HIGH SIDE = UP Cross-Sections page 1 Well: E~24a Field: PRUDHOE BA'~ Company; BP EXPLORATION (ALASKA) INC. Coul~trv: USA Tubing: 4.5 ins 12.6 ppf L-80 BTRS PDS Caliper Sections Survey Date: June 11, 2000 Tool Type: MFC40 No. 00432 Tool Size: 2 3/4" No. of Fingers: 40 Analysed: J. Burton Cross section for Joint 170 at depth Tool speed = -- ~ominal D = 3.958 'qorninal OD = 4.500 Remaining wa~l area = 98 % Tool devlat~or = 48 6850.8 ft Finger 20 Penetration = 0./32 ins Isolated Pit 0,13 In. = 49% Wall Pen. HIGH SIDE = UP Cross-Sections page 2 Well: E-24a Field: PRUDHOE BAY Company: BP E×PLORATION (ALASKA) iNC. Country: USA Tubins: 4.5 ins /2~6 ppf D80 8TRS PDS Caliper Sections Survey Date: June /1, 2000 Toot 't'ype: MFC40 No. 00432 Tool Size: 2 No. of Fingers: 40 Analysed: J. Burton Cross section for Joint 172 Tool speed = 67 Nominal ID = 3.958 Nominal OD = 4.500 Remaining wall area = 98 % Tool deviation = 48 ° at depth 6936.65 ft Finger 20 Pe~etratio*~ = 0.122 ins Isolated Pil 0.12 In. = 45% Wall Pen. I. IIGH SIDE = UP Cross~Seclions page 3 PDS ,_ALi PER Pipe: 4.5 ins 12.6 ppf L-80 BTRS Wall thickness. Body: 0.271ins Upset = 0.271ins Nominal ID: 3.958 ins Joint Depth Length Measured t Type No. ID feet feet inches .1 12.99 4.04 3.934 Pup .2[ 17.03 9.71 3.937 Pup 1 26.74 39.18 3.949 2 65.92 40.34 [ 3.939 3 106.26 42.09[ 3.956 4 148.35 41.95 3.967 5 190.30 40.04 3.952 6 230.34 40.62 3.938 7 270.96 42.28 3.941 8 313.24 ] 42.54 [ 3.950 9 355.78 42.15 3.945 10 397.93 40.58 3.959 11 438.51 40.14 3.945 12 478.65 39.93 3.938 13 518.58 39.00 3.929 14 557.58 41.87 3.942 15 599.45 41.61 3.952 16 641.06 40.31 3.962 1 7 681.37 41.96 3.979 18 723.33 41.99 nominal 19 765.32 40.95 3.943 20 806.27 42.70 3.945 21 848.97[ 38.74 3.956 22 887.71 39.27 3.939 23 926.98 41.46 3.959 24 968.44 41.89 nominal 25 1010.33 41.88 3.959 26 1052.21 38.45 3.946 2 7 1090.66 43.03 nominal 28 1133.69 38.22 3.960 29 1171.91 38.61 [ 3.962 30 1210.52 39.33[ 3.965 31 1249.85 39.17 3.969 32 1289.02 39.15 3.960 33 1328.17 38.26 3.965 34 1366.43 39.76 3.963 35 1406.19 41.,_'7 3.949 36 1447.46 41.52 nominal 37 1488.98 39.19 3.959 38 1528.17 39.91 3.948 39 1568.08 39.32 3.952 40 1607.40 38.70 3.959 41 1646.10 39.31 3.955 42 1685.41 39.72 3.969 43 1725.13 39.22 3.955 44 1764.35 39.60 3.967 45 1803.95 39.24 3.967 46 1843.19 39.16 3.965 47 1882.35 39.53 3.952 48 1921.88 39.14 3.963 OINT TALLY SHEET Well: E-24a Field: PRUDHOE BAY Company: BP EXPLORATION (ALASKA)INC. Country: USA Date: June 11, 2000 Joint Depth Length Measured Type No. ID feet feet inches 49 1961.02 39.15 3.962 50 2000.1 7 39.16 3.964 51 2039.33 39.68 3.956 52 2079.01 39.71 3.961 53 2118.72 39.66 3,959 53.1 2158.38 9.52 3.955 Pup 53.2 2167.90 14.23 nominal Sssv 53.3 2182.13 9.65 3.953 Pup 54 2191.78 39.29 3.962 55 2231.07 37.87 3.964 56 2268.94 39.16 3.962 57 2308.10 38.29 norninal 58 2346.39 39.52 3.960 59 2385.91 39.70 3.955 60 2425.61 39.58 3.960 61 2465.19 39.13 3.959 62 2504.32 39.45 3.956 63 2543.77 39.23 3.955 64 2583.00 37.88 3.956 65 2620.88 38.59 3.962 66 2659.47 39.84 3.962 67 2699.31 40.14 3.960 68 2739.45 42.16 3.948 69 2781.61 38.65 3.961 70 2820.26 39.57 nominal 71 2859.83 39.09 3.961 72 2898.92 39.23 nominal 73 2938.15 40.01 3.962 74 2978.16 39.23 3.949 75 301 7.39 39.10 3.952 76 3056.49 39.62 3.960 77 3096.11 39.12 3.962 78 3135.23 38.68 norninal 79 31 73.91 39.37 3.960 _ 80 3213.28 39.21 3.962 81 3252.49 38.62 3.962 82 3291.11 39.04 nominal 83 3330.15 39.24 nominal 84 3369.39 39.40 3.955 85 3408.79 39.21 3.954 86 3448.00 39.71 3.959 87 3487.71 37.75 3.960 88 3525.46 39.35 3.948 89 3564.81 39.42 3.951 90 3604.23 38.89 3.966 91 3643.12 38.25 3.962 92 3681.37 39.29 3.961 93 3720.66 38.71 3.960 94 3759.37 38.49 3.966 95 3797.86 39.74 3.954 Joint Tally page 1 PDS ,_.ALIPER JOINT TALLY SHEET Pipe: 4.5 ins 12.6 ppf L-80 BTRS Wall thickness. Body: 0.271ins Upset = 0.271ins Nominal ID: 3.958 ins Joint Depth Length Measured Type No. ID feet feet inches 96 3837.60 42.76 3.970 97 3880.36 35.59 3.943 98 3915.95 39.71 3.962 99 3955.66 39.19 3.963 100 3994.85 39.77 3.964 101 4034.62 39.60 3.960 102 4074.22 38.64 3.962 103 4112.86 38.46 nominal 104 4151.32 34.81 3.955 105 4186.13 40.41 3.963 106 4226.54 I 38.16 3.954 107 4264.70 39.18 3.964 107.1 4303.88 9.79 3.935 Pup 107.2 4313.67 8.47 nominal GIm3 107.3 4322.14 10.80 3.930 Pup 108 4332.94 41.66 3.963 109 4374.60 39.96 I 3.931 110 4414.56 40.00 3.944 111 4454.56 40.63 3.951 112 4495.19 39.67 3.955 113 4534.86 40.93 3.959 114 4575.79 39.71 3.968 115 4615.50 37.88 nominal 116 4653.38 42.51 nominal 11 7 4695.89 39.76 nominal 118 4735.65 39.44 3.947 119 4775.09 39.53 3.969 120 4814.62 39.11 3.969 121 4853.73 33.10 3.949 122 4886.83 39.65 3.962 123 4926.48 38.56 3.970 124 4965.04 38.91 3.970 125 5003.95 38.09 3.951 126 5042.04 42.50 3.955 127 5084.54 43.21 3.970 ._ 128 5127.75 42.36 3.967 ... 129 5170.11 43.04 3.961 130 5213.15 42.27 3.973 131 5255.42 38.42 3.963 132 5293.84 41.93 3.951 133 5335.77 38.97 3.949 134 5374.74 38.50 3.968 135 5413.24 39.66 3.967 136 5452.90 42.11 3.983 137 5495.01 39.11 3.962 138 5534.12 42.16 3.971 139 5576.28 34.71 3.961 140 5610.99 41.40 3.945 141 5652.39 41.76 3.941 142 5694.15 39.99 3.973 Well: E-24a Field: PRUDHOE BAY Company: BP EXPLORATION (ALASKA) INC. Country: USA Date: June 11, 2000 Joint Depth Length Measured Type No. ID feet feet inches 143 5734.14 40.41 3.953 144 5774.55 43.34 3.979 145 581 7.89 43.57 3.970 146 5861.46 41.48 3.981 I 147 5902.94 39.64 nominal 148 5942.58 39.54 3.976 149 5982.12 38.58 3.969 150 6020.70 41.78 3.961 151 6062.48 39.27 3.971 152 6101.75 43.18 3.973 153 6144.93 43.21 3.974 154 6188.14 42.23 3.962 155 6230.37 39.97 3.968 156 62 70.34 39.44 3.973 157 6309.78 42.01 3.966 158 6351.79 41.83 3.964 159 6393.62 39.88 3.963 160 6433.50 38.22 3.970 161 6471.72 37.78 3.970 162 6509.50 38.89 3.976 163 6548.39 38.47 3.976 164 6586.86 39.1 7 3.961 165 6626.03 39.28 3.968 166 6665.31 39.1 7 3.965 167 6704.48 39.74 3.972 168 6744.22 39.19 3.974 169 6783.41 39.66 3.982 170 6823.07 39.11 3.978 171 6862.18 39.02 3.982 172 6901.20 39.09 3.973 1 73 6940.29 39.90 3.975 1 74 6980.19 39.09 3.973 1 75 7019.28 39.71 3.983 1 76 7058.99 39.21 3.977 177 7098.20 40.08 3.972 178 7138.28 39.49 3.972 1 79 71 77.77 39.24 3.977 180 721 7.01 39.80 3.966 181 7256.81 39.09 3.975 182 7295.90 38.50 3.983 1.83 7334.40 39.12 3.980 184 73 73.52 39.38 3.982 185 7412.90 39.03 3.982 186 7451.93 39.02 3.956 187 7490.95 42.92 3.964 188 7533.87 38.97 3.984 189 7572.84 39.13 3.980 190 7611.97 39.30 3.980 191 7651.27 40.06 3.989 191.1 7691.33 9.72 3.953 Pup Joint Tally page 2 PDS . ALIPER JOINT TALLY SHEET Pipe: 4.5 ins 12.6 ppf L-80 BTRS Wall thickness. Body: 0.271 ins Upset = 0.271 ins Nominal ID: 3.958 ins Joint Depth Length Measured Type No. ID feet feet inches 191.2 7701.05 7.34 nominal GIm2 191.3 7708.39 11.34 3.944 Pup 192 7719.73 39.11 3.985 193 7758.84 I 39.48 3.982 194 7798.32 I 39.47 [ 3.966 195 7837.79 38.67 3.984 196 7876.46 39.60 3.984 197 7916.06 39. t 9 3.983 198 7955.25 39.16 3.982 199 7994.41 38.91 3.989 200 8033.32 39.44 3.984 201 8072.76 37.76 3.983 202 8110.52 38.77 3.990 203 8149.29 38.67 3.987 204 8187.96 39.88 3.982 205 8227.84 38.54 3.993 206 8266.38 40.55 3.989 207 8306.93 39.21 3.989 208 8346.14 39.02 3.973 209 8385.16 38.92 3.990 210 8424.08 35.63 3.988 211 8459.71 40.56 3.986 212 8500.27 39.01 3.995 213 8539.28 38.67 3.989 I 214 8577.95 39.16 3.988t 215 861 7.11 39.46 3.998 216 8656.57 39.11 3.988 21 7 8695.68 42.08 3.982 218 8737.76 39.43 3.996 219 8777.19 39.09 3.991 220 8816.28 42.84 3.991 221 8859.12 36.51 3.991 222 8895.63 41.85 3.970 223 8937.48 38.55 3.988 224 8976.03 39.39 3.995 225 9015.42 36.66 3.976 226 9052.08 39.08 3.993 227 9091.16I 39.67 4.001 228 9130.83I 39.68 3.984 228.1 9170.51 8.93 3.939 Pup 228.2 91 79.44 10.21 nominal Glml 228.3 9189.65 9.88 3.937 Pup 229 9199.53 41.31 3.974 230 9240.84 36.49 3.985 231 9277.33 41.00 3.938 231.1 9318.33 8.42 3.990 Pup 231.2 9326.75 3.84 nominal X-nip 231.3 9330.59 8.23 3.991 Pup 231.4 9338.82 17.99 nominal I Pkr 231.5 9356.81 9.59 3.988[ Pup Well: E-24a Field: PRUDHOE BAY Company: BP EXPLORATION {ALASKA) INC. Country: USA Date: June 11, 2000 Joint Depth Length Measured Type No. ID feet feet inches 231.6 9366.40 5.92 3.989 Pup 231.7 9372.32 5.12 nominal X-nip 231.8 9377.44 9.51 3.996 Pup 231.9 9386.95 10.38 nominal Xn-nip 232 9397.33 unknown 3.938 WLeg Joint Tally page 3 Well: E-24a Field: PRUDHOE BAY Company: BP EXPLORATION (ALASKA) INC. Country: USA PDS Caliper Overview Body Region Analysis Survey Date: June 11, 2000 Tool Type: MFC40 No. 00432 Toot Size: 2 3/4" No. of Fingers; 40 Analysed: J. Burton Tubing: Size Weight Grade & Thread Nora.OD Nora. ID Nora. Upset 5 ins 15 ppf 13CR, STL 5 ins 4,408 ins 5 ins Penetration and Meal Loss (% wall) penetration body ~!;~ metal loss body 0to 1 to 10to 20 to 40 to above 1% 10% 20% 40% 85% 85% Number of joints analysed (total = 28) Pene 3 23 2 0 0 0 Loss 2 26 0 0 0 0 Damage Configuration ( body ) Number of ioints damage~ (tom[ = 2) 2 0 0 0 0 Damage Profile (% wall) penetration body ~?:>;~ metal loss body 0 50 1 11 21 Bottom of Survey = 28 100 Analysis Overview page 2 PDS CAL ER JOINT TABULATION Pipe: 5 ins 15 ppf 13CR, STL Well: Wall thickness. Body: 0.296ins Upset = 0.296ins Field: Nominal ID: 4.408 ins Company: Country: Date: E-24a PRUDHOE BAY BP EXPLORATION (ALASKA) INC.~8 penetration body USA ~;~i ~ metal loss body June 11, 2000 Joint Penetration Metal Projection Minimum Damage profile No. Upset Body Loss Upset Body ID Comments % wall) inches inches % % inches inches inches 0 50 ~0 1 0 .04 12 6 0 ,05 4,40 ~hallow pitting. 2 I 0 .01 3 2 0 .061 4.38 Lt. Deposits. 3 I 0 .00 2 0 .06 4.33 Lt, Deposits. 4 I 0 .02 6 2 0 .05 4.39 5 0 .01 2 1 0 0 4.39 6 0 .01 4 3 0 .06 4.39 7 0 .02 I 5 2 0 .06 4.37 8 0 .01 4 3 0 .07 4.37 Lt. Deposits. 9[0[ .02 ~2 0 .05 4.35 I [ [10 0- .02 8 2 0 .04 4.39 11 0 .03 c 1 0 .04 4.39 12 0 .01 2 ! 0 0 4.39 _13 0 .01 ___.2_ 2 0 ,06 4.35 Lt. Deposits. 14 0 .01 2 0 .04 4.36 15 0 .01 4 2 0 .04 4.36 16 ~0 .01 2 0 .04 4.36 17 0 .01 2 0 0 4.40 18 0 .01 2 0 0 4.37 19 0 .00 2 0 0 4.37 20 0 .01 2 0 0 4,40 21 0 .01 2 0 0 4.37 22 0 .01 3 0 0 4.37 23 0 .01 2 0 0 4.39 24 0 .04 12 2 0 -- 0 4.40 Shallow pitting. 25 0 .03 2 0 .04 4.32 26 0 .01 3 0 0 4.41 27 0 .00 3 0 0 4.38 28 0 .01 4 0 0 4.41 __ Damage Classifications Penetration / projection class, in order of damage severity Hole - penetration exceeds 85% of nominal wall thickness Ring - damage area exceeds 75% o{ circumference, but depth range does not exceed I * pipe ID Line - damage depth range exceeds 5 * pipe ID, but extends [ess than 22% of circumference General* damage depth range exceeds 1 * pipe ID and/or extends more than 22% of circumference Isolated - damage depth range does not exceed 5 * pipe ID or extend more than 22% of circumference Damage reporting threshold = 30 thou inches deviation in body, 50 thou in upset. Modal line length = 0.800 feet. Pipe Tabulations page PDS ._ALIPER JOINT TALLY SHEET Pipe:5ins 15ppf 13CR, STL Wall thickness. Body: 0.296ins Upset -- 0.296ins Nominal ID: 4.408 ins Joint Depth Length Measured Type No. ID feet feet inches 1 9411.92 43.40 4.447 2 9455.32 42.95 4.432 3 9498.2 7 43.06 4.444 4 9541.33 42.45 4.441 5 9583.78 i 42.92 4.440 6 9626.70 41.80 4.443 7 9668.50 42.18 4.441 8 9710.68 42.84 4.432 9 9753.52 43.31 4.442 10 9796.83 43.66 4.436 11 9840.49 42.93 4.442 12 9883.42 42.69 4.438 13 9926.11 42.62 4.444 14 9968.73 42.75 4.444 15 10011.48 43.15 4.448 16 10054.63 42.75 4.449 1 7 10097.38 42.56 4.442 18 10139.94 42.54 4.446 19 10182.48 43.86 4.449 20 10226.34 42.67 4.442 21 10269.01 42.91 4.451 22 10311.92 43.15 4.448 23 10355.07 43.37 4.439 24 10398.44 43.21 4.438 25 10441.65 44.41 4.443 26 10486.06 41.91 4.451 2 7 10527.97 39.85 4.438 28 10567.82 unknown 4.432 Well: E-24a Field: PRUDHOE BAY Company: BP EXPLORATION (ALASKA)INC. Country: USA Date: June 11, 2000 Joint Depth Length Measured Type No. ID feet feet inches Joint Tally page 1 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 30 November 1994 Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PLS FINAL BL + RF 1 CN/GR FINAL BL + RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL + RF 1 PLS FINAL BL + RF 1 CN/GR FINAL BL + RF 1 PFC/PERF FINAL BL+RF 1 GR/CCL TCP FNL BL+RF 1 GR/CCL PACKER FNL BL 1 GR/CCL PACKER FNL RF 1 PLS FINAL BL + RF 1 GR/CCL FINAL BL + RF 1 PLS FINAL BL'+ RF Run # 1 Run # 1 Run # 1 Run ~ 1 Run # 1 Run # 1 Run ~ 1 Run # 1 Run ~ 1 Run # 1 ECC No. 1414.03 2568.03 2577.05 4014.02 4472.01 5809.05 6020.01 6307.00 Run # 1 6308.00 Run # 1 6309.00 Run # 1 Please sign and return to: Ati~Wireline Set'vices 560o ~ Rodney D. ~son Received by ,~~ ~~ Date: MEMORANDUM State of Alaska TO: THRU: David John~ Chairm~ Blair Wondzell, P. I. Supervisor~..,~ FROM: Bobby Fost SUBJECT: Petroleum Inspector Alaska Oil and Gas Conservation Commission DATE: November 9, 1994 FILE NO: AIGIKIBD.doc BOPE Test- Doyon 14 BPX - PBU - E-23A Prudhoe Bay Field Wednesday, November 9, 1994: I traveled this date to BPX's PBU E pad and witnessed the BOPE test on well E-24A being drilled by Doyon rig 14. As the attached AOGCC BOPE Test Report shows there was 1 failure. The lower kelly valve leaked. This was changed and tested OK. The location was clean and all extra drilling equipment was stored properly. The rig was clean and all equipment seemed to be in good working order. Summary: I witnessed the BOPE test on Doyon RIG 14 - test time 2.5 hours - 1 failure. Attachment: AIGIKIBD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: 7" Test: Initial X Workover: DOYON Rig No. 14 PTD # BPX Rep.: E-24A Rig Rep.: Set @ 9839' Location: Sec. X Weekly Other DATE: 11/9/94 g4-122 Rig Ph.# 659- 4510 JIM GAFFNEY MARK"LA TCH" EGHOLM 8 T. 11N R. 14E Meridian U MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) Reserve Pit N/A Well Sign OK Drl. Rig OK BOP STACK: Quan. Annular Preventer 1 Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve N~, Test Pressure P/F 500/3000 P 1 500~5000 P 1 500~5000 P 1 500~5000 P 3 500~5000 P 2 500~5000 P 3 500~5000 P MUD SYSTEM: Visual Alarm Trip Tank OK NO Pit Level Indicators OK OK Flow Indicator OK OK Gas Detectors OK OK FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly/IBOP Ball Type Inside BOP Quan. 1 1 1 1 Test Pressure P/F 500~5000 P 500~5000 P 500~5000 P 500~5000 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes 14 Test Pressure P/F 500~5000 P 36 500~5000 P 1 P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure 0 System Pressure Attained 2 Blind Switch Covers: Master: Nitgn. Btl's: 4 ~ 2100 3,000 IP 1,400 P minutes 36 sec. minutes 17 sec. YES Remote: YES Psig. Number of Failures: '/ ,Test Time: 2.5 Hours. Number of valves tested 26 Repair or Replacement of Failed Equipment will be made within 0 days. Noti~ the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. i. Supervisor at 279-1433 REMARKS: Failure: The lower kelly failed - replaced and tested OK Distribution: orig-Well File c - Oper./Rig c - Database c - Trip Rpt File c -Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: BOBBY D. FOSTER FI-021L (Rev. 7/19) AIGIKIBD.XLS MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: David J o h n__0.L~~, C hai rrna'F.~,.-~ Blair Wondzel,, ~,~/,,/,~,~ P. I. Supervisor FROM: Lou Grimaldi, ~'"',--~ SUBJECT: Petroleum Inspector DATE: October 11, 1994 FILE NO: PHGJJKBD.DOC Perforations Cement plug BPX well # E-24 Prudhoe Bay Field PTD # 940-122 Monday, October 10, 1994: I traveled to BPX E pad to witness the verification of placement of the cement plug at the perforations in well # 24. When I arrived the rig was just tripping in the hole and was running late due to problems setting the 9 5/8 packoff. I was informed it would be approximately 0200 hours to bottom. Tuesday, October 11, 1994: At 0230 hrs the rig tagged cement at 9573' RKB the mud motor was started and they milled down to 9587' RKB where the cement seemed alot firmer. The motor was stopped and 15000 K was set down with out the appearance of settling in. When the string was picked up it was smooth giving all indications of a solid, setup cement plug. The rig then prepared to drill down to the window that had been previously cut at 9839' RKB. SUMMARY: I witnessed the verification of placement of the cement plug at the perforations in BPX well #E-24 in the Prudhoe Bay field. Attachments: PHGJJKBD.XLS STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Plug And Abandonment Report Operator: BPX Operator Rep.: Dink Heim Lease No.: Well No.: Total Depth: Well Name: E-24 PTD No.: 94-122 Sec. T-R 6,11N, 14E Elevation: Date: 10/11/94 Meridian: 32 Mud Wt.: ppg. CASING DATA: Drive Pipe: O.D." Set @: ft. With Penetration Conductor: O.D." Set @: ft. Surface: O.D." Set @: Intermediate: O.D." Set @: ft. Prodctn: O.D." Set @: PLUGGING DATA: 1. Open Hole Plugs: 2. Open Hole Isolation Plugs: 3. Perforation Plugs: Tag Cement at 9573',mill to 9587' set 15000 K down. Drill to top of window at 9839. Top of perfs at 10,520 (ELM) 4. Annulus Plugs: 5. Casing Stub Plugs: 6. Surface Plug: Casing Removal: REMARKS: " Casing Cut @ Feet " Casing Cut @ Feet " Casing Cut @ Feet " Casing Cut @ Feet Distribution: odg - Well File c - Operator c - DNR/DOG c- Database c - Rpt File c- Inspector Inspector (s): Louis R Grimaldi Fl-000 (Rev. 3~93) PHGJJKBD.XLS ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 September 20, 1994 A C Clark, Drlg Engr Supv BP Exploration (Alaska)Inc P O Box 196612 Anchorage, AK 99519-6612 Re: Well # Company Permit # Surf Loc Btmhole Loc Prudhoe Bay Unit E-24A BP Exploration (Alaska) Inc 94-122 1786'SNL, 501'WEL, Sec6, T11N, R14E, UM 2564'SNL, 1420'WEL, Sec 7, T11N, R14E, UM Dear Mr Clark: Enclosed is the approved application for permit to re-drill the above referenced well. The permit to re-drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting re-drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordadnce with 20 AAC 25.035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling a new hole. Notice may be given by contacting the Commission's petroleum field inspector on the North Slope pager at 659-3607. Chairman ~ , BY ORDER OF THE COMMISSION jo/encl c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 la.. Type of work Drill [] RedrillEIIlb. Type of well. Exploratory[] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenFII Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration 64.68 feet Prudhoe Bay Field/Prudhoe 3. Address 16. Property Designation Bay Pool P. 0. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28304 4. Location of well at surface 17. Unit or property Name 11. Type Bond(me 20 ,~c 25.025) 1786'SNL, 501' WEL, SEC. 6, T11N, R14E Prudhoe Bay Unit At top of productive interval !8. Well number Number 1694'SNL, 1552' WEL, SEC. 7, T11N, R14E E-24A (32-7-11-14) 2S100302630-277 At total depth 9. Approximate spud date Amount 2564' SNL, 1420' WEL, SEC. 7, T11N, R14E 10/2/94 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(MDa, dTVD) property line ADL 28305-2716' feet No close approach feet 2560 12201'MD/8931' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (me 20 A^C 25.035 (e)(2)) Kickoff depth ~s,~6 feet Maximum hole angle ~ o Maximum surface 3330 pslg At total depth (TVD) ~800'/4390 18. Casing program Specifications Setting Depth size Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length M D TVD MD TVD (include stage data) 6" 5" 15# 13CR8O STL 2750' 9450' 8000' 12201' 8931' 230 sx Class "G" I'~L~LI V CL./ 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary S EP '1,5 1994 Total depth: measured 10735 feet Plugs (measured) Ai~ska 0il & Gas Cons. gommission true vertical 9047 feet Anchorage Effective depth: measured 10692 feet dunk (measured) true vertical 9017 feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor 20" 8 cu yds Concrete 110' 110' Surface 2635' 13-3/8" 3723 cu ft PF 2673' 2673' Intermediate 9781' 9-5/8" 2073 cu ft "G" 9816' 8367' Production Liner 1167' 7" 400 cu ft "G" 10735' 9047' Perforation depth: measured 10542'-10552'(Squeezed) 10560'-10612", 10618'-10632', 10538'-10552', 10520'-10538'(Open) true vertical 8844'-8852' (Squeezed)8857'-8894', 8898'-8908't 8841'-8852'~ 8826'-8841'(Open) 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drillin~ fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify th~."t .the/for, e9oin§/is true and correct to the best of my knowledge Si~lned ~,/' ~' '/~L~,._~7~ Title Drillin~ En~ineerSupervisor Date ' Commission Use Only ' Permit Number IAPI number IApp~val date See cover letter ~ ~" -/..2_ 2-. 15 0- O 2_ ~- - .2./.-~' ~ -" ~ / I 4f~'" ~'' O '- ~,,c/ for other requirements Conditions 'of approval Samples required [] Yes ,;~ No Mud Icg required []Yes [~ No Hydrogen sulfide measures [] Yes ~ No Directional survey requlreo ~ Yes [] NO Required working pressure for BOPE [] 2M; [-13M; ~hM; t-I10M; F"I15M; Other: Original Signed By by order of Approved by r)avid W. Johnston Commissioner [ne commission Date.2/"Z~./.?~ Form 10,401 Rev. 12-1-85 Submit in tril I Well Name: I E-24A IType of Redrill (producer or injector)- Redrill Plan Summary PRODL~ER Surface 1785.76 FNL 500.31 FEL SEC6 TWNSHP 11N RANGE 14E Location: Target Location: 1694.42 FNL 1551.91 FEL SEC7 TWNSHP 11N RANGE 14E Bottom Hole 2563.7 FNL 1419.52 FEL SEC 7 TWNSHP 11N RANGE 14E Location: AFE Number: 4P8011 Estimated Start 02OCT94 Date: IUD.- 112,201' IRig: I IOperating days to complete- ITv[): 18931 I DOYON RIG #14 17 I KBE: 64.68 J Well Design (conventional, slimhole, etc.;): HORIZONTAL SIDETRACK Objecti ve' SADLEROCHIT Mud Program: A 9.5 - 10.00 ppg Biozan polymer/KCI water based mud will be used. Special A non-damaging xanvis polymer mud at 8.6-9.0 ppg is design planned to be used to drill the 6" hole interval however consideration a waterbased system may be substituted for the s polymer system. Depth Densi PV YP INT 10MIN FL OIL SOLID (TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S (PPG) ) min (%) KOP' 9.5 10 15 5 10 10 0 5 to to to to to to to to to TD' 10.0 18 30 15 30 5 0 10 RECEIVED Directional: [KOP: [9,846' md SEP 1 5 1994 Alaska 0il & Gas Cons. Commission Anchorage E-24A Redrill Plan Summary Page 1 Maximum Hole .Angle: Close Approach Well: 91° The above listed wells will be secured during the close approach. Casin ]/Tubing Proqram: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbcj O.D. MD/TVD MD/TVD 6" 5" 15# 13CR-80 STL 2,750 9450/8000 12201/8931 N/A 4-1/2 12.6 L-80 TDS 9450 SURFACE 9450/8000 Cement Calculations: Liner Size- 5", 15#, 13CR-80, STL 50% open hole excess, 80' shoe joint, 279' liner lap (7"), 117' lap in 9-5/8", and 100' excess above liner with 5" DP. Total Cement 48 bbl 230 sxs of Class G Blend @ 1.17 ft3/sx Volume: Liner N/A Size: sB..asi 1 50% open hole excess, 40' shoe joint, 150' liner lap and 150' excess above liner with DP. Total CementVolume: I ~/^l sxs of Class G Blend @ 1.18 ft3/sx Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. SEP '~ 5 't994 ~s~,~ Oi~ & Gas Cons. Commission Anchor~ E-24A Redrill Plan Summary Page 2 SUMMARY PROCEDURE I , . 3. 4. 5. 6. 7. . . 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. Pre-rig work. Displace well to seawater. Freeze protect tubing and annulus to 2200' md and set a BPV. Move in drilling rig. Pull BPV. Circulate diesel freeze protection cap from well and recover for future use. Install a BPV and tree test plug. Remove the production tree. Install BOP's and test to 5000 psi. Remove the test plug and BPV. Shear SBR. Pull and lay down the 5-1/2" x 4-1/2" tubing. Displace well to milling fluid. Cut a 50' section in the 7" casing starting from about _+9.846'MD. RIH with 1,300' OF 2-7/8", 8.7#, L-80, DSS-HTC tubing to PBTD at 10,652' md. Spot a 47 bbl balanced cement plug to abandon perforations as well as serve as a kickoff plug. Pull out of hole to just inside top of liner. Squeeze away 10 bbl of cement. Reverse circulate out any cement. Run in with an 4-3/4" steerable drilling assembly and a 6" bit with gamma ray/directional MWD and dress the cement to 5' below the section top. Kickoff and displace well to FLO-PRO system. Continue to directionally drill to TD at +_12,201' md which should yield ___880' of horizontal section (see attached directional plan). Make a conditioning trip with a 6" hole-opener for the open hole section and with a 9-5/8" casing scraper spaced to clean the casing. Install a 5". 15". L-80 or 13CR-~0 . STL SOLID liner with 5" X 9-5/8" packer/hanger. Space packer / hanger to be set at +_9,425' md. Cement the liner in place with the total cement volume based upon 50 % open-hole enlargement plus the 80' shoe volume, 150' lap volume and 150' excess on top of the liner with drillpipe in the hole. Re-test BOP's as needed. PU 3-1/8" BHA. RIH and cleanout liner. Displace well to seawater. RIH with drillpipe conveyed perforating assembly and perforate the well. POOH LDDP. Run the 4-1/2" L-80 completion string assembly re-using as much of the 4-1/2" tubing and jewelry that was pulled from the well. Space out and circulate with corrosion inhibitor. Install a BPV and test plug. Remove BOP's. Install and test the production tree to 5000 psi. Pull tree test plug and BPV. Set packer. Test the tubing x casing annulus to 3500 psi for 30 minutes. Shear RP valve in the upper GLM and freeze protect the well. Set a BPV. Release rig. Complete appropriate documentation and hand-over to Production. REEEIVED SEP 1 5 1994 Alaska 0ii & Gas Cons. Commission Anchora,,~, E-24A Redrill Plan Summary Page 3 Prudhoe Bay Drilling Prudhoe Bay Unit f-' E-PAD E-24A Wp7 (Medium Radius) CRITICAL POINT DATA MD Inc Azl. KDP / TIE IN / 9846 38.6R' 804.83' START DF CURVE 8 4.00'/100 F~ ~HUBLIK 9879 38.71' 808,13' TSAD - IVISHAK 9956 39.07' 197.85' TVD N/S 8391 396E S 1053 W 8417 3981 ~ 1061 W 8477 40E7 S 1077 W / ZONE 4 - 48 END DF CURVE 10074 40.00' 190.00' 8567 4100 ~ 1095 ZONE 3 10118 40.00' 190.00' 860~ 41~8 S llOO ZONE E - EC 10803 40.00' 190,00' 8667 4188 ~ 1109 START DF 10384 40,00' 190.00' 8759 4E58 S llE3 CURVE R 11.00'/100 F~ RGDC 10515 59.73' 180.39' 8888 4408 S 1134 ZONE 1 - 13 10594 68.18' 177.57' 8917 4474 S 1133 END DF CURVE 10810 90.99' 171,14' 8955 4683 S 1111 S~n~ horz, l13E1 90.99' 171.14' 8947 5188 S 1033 jTCnDet Name TVD NS EW Gpld X Gnld Y S%mn% honz. 8947 5188 ~ 1033 V 663567 5970069 End honz. 8987 G066 S 998 W 663687 5969192 Tcrge~ polygon Bgb-~ 5188 S I033 W 663567 5970069 SCALE 200 ff./DIYIS/ON TTD REF: ~zmm~D TKt~i/CAL SECTION P, KF: ]F~T.I~rRAD 8/29/94 B 133 bm HALL I BURTON Eomzo~ ~ (~u~ BC~d~E ~00 fL/ DrvISION ~7. 20 OE . l~O'nn. ~ 10046 HD 8667 . 190.00. ~ 118 HD e 10203 HD 873B . ZBO, O0. 8 10~84 HO 8829 - 184.27' E 10424 ~ 8BB6 - lBO.OS' B 10524 MD 8987 - 176.63' 8 [0624 MD 8950 - ~7~.6~' ~ %0784 MD 89b-5 - t7%.%~' ~ IOBLO MD ~947 - %71..i4' ~ t%3~t gg I I I I 1600 14OO laDD fOOD 600 800 iL4' ~ 1EEO1 ~D 3800 -~4000 ----4800 -----4400 -~4&O0 -~4800 ----5000 ---5800 .---5400 --5600 ~BO0 .~ooo ----&EO0 6400 400 RECEIVED -- -4074-- ~38.6E' ~ 9846 HJ] KDP / TIE IN / ST~T DF CURVE R 4,00'/100 f~ -- --4094-----~%38.7[' ~ 9879 MD ~HUBLIK --- 4t4~---~9.0~- . 99~ MD ~ - ~r~ ~ z~:4 - ~ SEP 1 5 1994. .... 4~t6 .... ~ 40.00' E 10074 MD ~ OF ~VE - .-- ~a~ .... ~4o.o~', ~o~ ~ m~ 3 AiaS~ OiJ & Gas Cons. Co~mJssion .... 1376 ...... ~0.00' E 10384 ~ XTART DF ~R~ E 11.00'/100 f~ ~30.83' E 10484 MD ' ...... ~ ....... ~6B.1B' E 10~4 ~ ~ I - l~ 3800 4000 4200 4400 4600 4800 5000 b-~O0 5400 5600 5800 6000 6EOO 6400 Y'~RT[CkI SECTION' PI~X'~: 188.4-2 -WELLPLAN FEASIBILITY' STUDY This plan is for feasibility purposes only, it has not yet been certified. STATE OF ALASKA ' ~ A. ,KA OIL AND GAS CONSERVATION COMMI5 N APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon X Suspend __ Operation Shutdown__ Re-enter suspended well__ Alter casing __ Repair well __ Plugging X Time extension __ Stimulate __ Chan. ge approved program __ Pull tubing__ Variance__ Perforate __ Other X __ Plugback for redrlll At effective depth At total depth 1037'SNL, 1735'WEL, SEC. 7, T11N, R14E 2. Name of Operator 5. Type of Well: 6. BP Exploration Development x Exploratory __ 3. Address Stratigraphic __ 7, P. O. Box 196612, Anchorage, Alaska 99519-6612 Service__ 4. Location of well at surface 8. At top of productive interval ~ g. 530'SNL, 1581'WEL, SEC. 7, TllN, R14E _~ ~ SE 10. Atas~ 0il & Gas Cons. Commission 11. /~ch0r~e 12. Present well condition summary Total depth: measured true vertical 10735 feet 9047 feet Plugs (measured) Datum elevation (DF or KB) KBE = 67.48' feet Unit or Property name Prudhoe Bay Unit Well number E-24 (31-7-11-14) Permit number 87-122 APl number 50- 029-21769 Field/Pool Prudhoe Bay Field/Oil Pool Effective depth: measured true vertical 10692 feet Junk (measured) 9017 feet Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: .Length Size Cemented Measured depth True vertical depth 20" 8 cu yds concrete 110' 110' 2635' 13-3/8" 3723 cu ft Permafrost 2673' 2673' 9781' 9-5/8" 2073 cuft Class "G" 9816' 8367' 1167' 7" 400 cu ft Class "G" 10735' 9047' measured 10542'- 10552' (Squeezed) 10560'- 10612', 10618'- 10632', 10538'- 10552', 10520'- 10538' (Open) true vertical 8844'-8852' (Squeezed)8857'-8894', 8898'-8908', 8841 '-8852', 8826'-8841' (Open) Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 tubing to 2511'MD; 4-1/2", 12.6#, L-80 tubing to 9602'MD Packers and SSSV (type and measured depth) 9-5/8" TIW "HBB" packer @ 9497' MD; 5-1/2" Otis "RQM" SSSV @ 2056' MD 13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch 14. Estimated date for commencing operation 9/18/94 16. If proposal was verbally approved Name of approVer Date approved 15. Status of well classification as: Oil x Gas Suspended __ Service 17. I hereby certify that !~e foregoing is true and correct to the best of my knowledge. Signed -// / ~. ~( L~."'-7~ Title Drilling EngineerSupervisor FOR COMMISSION US~E ONLY Conditions of approval: Notify Commission so representative may wit.~nes~.il Plug integrity BOP Test __ Location cl~'-~e ~ Mechanical Integrity Test Subseo~ent ~re'~ed 10~ Approved by order of the Commission Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE WELL PERMIT CHECKLIST WELL NAME GEOL AREA UNIT# PROGRAM: exp [] dev [] redrll~ ON/OFF SHORE serv [] ADMINISTRATION ENGINEERING 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ..... '7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval. 13. Can permit be approved before 15-day wait ....... APPR 14. Conductor string provided ................ Y N 15. Surface casing protects all known USDWs ......... Y N 16. CMT vol adequate to circulate on conductor & surf csg.. Y N 17. CMT vol adequate to tie-in long string to surf csg . .'.~ N 18. CMT will cover all known productive horizons ...... N 19. Casing designs adequate for C, T, B & permafrost .... N 20. Adequate tankage or reserve pit ............. N 21. If a re-drill, has a 10-403 for abndnmnt been approved..~ N 22. Adequate wellbore separation proposed .......... N 23. If diverter required, is it adequate ........... 24. Drilling fluid program schematic & equip list adequate ~_~ N 25. BOPEs adequate ............. i~ N 26. BOPE press rating adequate; test to ~"'~'~'~'~ ;~}~~/ N 27. Choke manifold complies w/API RP-53 (May 84) ....... 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............. Y ~ GEOLOGY APPR 30. Permit can be issued w/o hydrogen sulfide measures .... Y N/ 31. Data presented on potential overpressure zones ..... Y /N /g 32. Seismic analysis 9f shallow gas zones .......... ~/ i ~t~, 33. Seabed condition survey (if off-shore) ........ JY N 34. Contact name/phone for weekly progress reports .... /. Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: HOW/jo - A:~ORMS~heklist rev 0.3/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. E - 24A RECEIVED FEB 8 1995 PRUDHOE B ,AY:a o,, & Gas Cons. Comm'ssion Anchorage H C.. E D Run 1' 14 - January - 1995 PDK-100/GR Cased Hole 1O6OO 1213O Atlas Wireline Services Tape Subf~le 2'is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD E - 24A 500292176901 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 31-JAN-95 6309.01 K. BRUNNER K. SMITH 6 liN 14E 1786 501 65.65 64.13 30.10 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 9.625 9816.0 3RD STRING 5.000 12240.0 PRODUCTION STRING 4.500 9405.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: MWD GR 1 1 Il-NOV-94 SPERRY SUN DRILLING SERVICES BASELINE DEPTH 10830.0 10842.5 10893.0 10898.5 10902.0 10903.0 10903.5 10925.5 10949.0 10981.0 10982.0 10994.5 10999.5 GRCH 10830.0 10844.5 10895.0 10900.5 10904.5 10905.0 10905.5 10927.0 10949.5 10982.5 10983.0 10996.0 11001.0 EQUIVALENT UNSHIFTED DEPTH 47.00 15.00 12.60 11000.0 11052.5 11053.5 11068.5 11069.5 11073.0 11078.0 11085.0 11086.0 11086.5 11087.5 11093.5 11094.0 11094.5 11095.5 11107.0 11108.0 11137.0 11138.0 11143.5 11144.5 11145.5 11148.5 11149.5 11150.0 11150.5 11195.0 11209.0 11215.0 11228.0 11234.0 11240.5 11277.5 11287.0 11331.5 11338.0 11349.5 11357.5 11367.5 11386.5 11397.0 11398.0 11398.5 11402.5 11403.5 11415.0 11415.5 11416.0 11423 · 0 11424.0 11430.0 11445.5 11544.5 11554.5 11558.0 11581.5 11590.0 11604.5 11671.0 11734.0 11002.0 11054.5 11055.0 11070.0 11070.5 11074.0 11080.5 11087.5 11088.0 11088.5 11089.0 11095.0 11096.0 11096.5 11097.0 11108.5 11109.0 11138.5 11139.5 11146.5 11147.5 11148.0 11151.0 11151.5 11152.0 11153.0 11196.5 11210.5 11216.5 11230.5 11236.0 11243.0 11279.5 11289.0 11330.0 11337.0 11351.5 11360.5 11369.5 11390.0 11400.0 11401.5 11402.5 11406.5 11407.0 11418.5 11419.0 11419.5 11426.5 11428.5 11434.0 11449.0 11544.5 11555.0 11558.5 11580.5 11589.0 11603.5 11670.5 11732.0 11735.0' 11744.0 11757.5 11801.5 11872.5 11888.0 11925.0 11926.0 11927.5 11940.0 11940.5 11962.0 11983.5 12034.0 12062.0 12090.0 $ REMARKS: 11732.5 11741.5 11758.5 11801.5 11872.5 11888.5 11929.0 11930.0 11930.5 11943.0 11944.0 11965.5 11989.0 12036.0 12064.5 12090.0 PDK-100/GR Log. LOG TIED INTO SPERRY SUN MWD. THIS IS A HORIZONTAL HOLE AND WAS LOGGED WITH COILED TUBING. ******************** NOTE ********************* , * DATA DEPTH MATCHED TO MWD RUN 11-NOV-94 PER * * BP'S REQUEST. MWD IS THE DEPTH REFERENCE * * FOR THIS WELL. * , , ******************** NOTE ********************* PRODUCTION RATES (06-JAN-95): ELAPSED TIME = 12.0 HOURS GROSS FLUID RATE = 1.34 MBPB NET OIL RATE = 1.29 MBOPD NET WATER RATE = 0.05 MBWPD FORMATION GAS RATE = 6.34 MMSCFD GOR LIFT GAS RATE CASING PRESSURE TGOR TGLR CHOKE OPENING WATER CUT = 4900 SCF/STB = 0.0 MMSCFD = 1217 PSIG = 6472 SCF/STB = 6247 SCF/BBL = 95.6 = 3.5 % LOGGING PROGRAM ORGANIZATION: 1. LOGGED FLOWING PASS. 2. LOGGED BASE WATER PASS. 3. LOGGED 20 BBLS BORAX AWAY PASS. 4. LOGGED 44 BBLS BORAX AWAY PASS. 5. LOGGED 100 BBLS BORAX AWAY PASS. A DIFFUSION CORRECTED SGMA CURVE IS INCLUDED FOR THE FLOWING AND BASE WATER PASSES. THE CURVE IS NAMED SGNT AND WAS CORRECTED WITH THE FOLLOWING PARAMETERS: FLOWING PASS BOREHOLE SIZE = 8" CASING SIZE = 5.5" SALINITY = 0 PPM BASE WATER PASS BOREHOLE SIZE = 8" CASING SIZE = 5.5" SALINITY = 25,000 PPM A PDK POROSITY CURVE (PHI) WAS ALSO CREATED FOR THE BASE WATER PASS. SHIFT PROCEDURE AS FOLLOWS: 1. FIRST PASS GAMMA RAY DEPTH MATCHED TO PREVIOUS OPEN HOLE GAMMA RAY. 2. FIRST PASS SGMA DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3. ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4. ALL SUBSEQUENT SGMA (PDK) PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS SGMA. / ? ?MATCH1A. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 10833.0 PDK 10845.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH SGMA 10830.0 10830.0 10857.5 10857.5 10908.0 10909.0 10946.0 10946.0 11002.5 11000.5 11051.0 11050.5 11079.5 11081.0 11098.5 11099.0 11099.0 11100.0 11106.0 11107.0 11106.5 11108.5 11194.5 11196.5 11232.5 11234.5 11274.0 11276.0 11287.0 11289.0 11331.5 11330.5 11338.5 11338.0 11357.0 11360.5 11374.0 11377.5 11545.5 11545.0 11565.5 11568.0 11592.5 11592.5 11658.5 11662.0 11756.0 11756.0 11818.0 11820.0 11872.5 11875.0 11934.0 11936.5 11991.5 11988.5 11992.0 11989.0 11992.5 11990.0 11995.0 11992.5 11996.0 11993.0 12012.0 12012.5 12014.5 12015.0 12034.0 12036.5 12038.5 12041.0 12066.5 12068.0 12067.0 12068.5 12068.0 12069.0 for each pass in separate files. STOP DEPTH 12074.0 12086.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH 12068.5 12069.0 12070.5 12071.5 12072.0 12073.0 12074.0 12074.5 12090.0 $ REMARKS: 12069.5 12070.5 12072.0 12072.5 12073.0 12073.5 12074.5 12075.0 12090.0 FLOWING PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ??MATCH1B . OUT $ CN : BP EXPLORATION WN : E - 24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 CU 8 RATO PDK 68 1 9 RBOR PDK 68 1 10 RICS PDK 68 1 11 RIN PDK 68 1 12 SGMA PDK 68 1 CU 13 SGMB PDK 68 1 CU 14 SS PDK 68 1 CPS 15 SGNT PDK 68 1 CU 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 60 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 169 Tape 'File~Start Depth = 10830.000000 Tape File End Depth = 12090.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 40337 datums Tape Subfile: 2 459 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10690.0 10702.0 BASELINE DEPTH GRCH 10685.0 10687.5 10731.0 10741.5 10760.5 10789.0 10812.5 10825.5 10839.0 10840.5 10845.0 10866.0 10875.0 10877.0 10897.5 10899.0 10898.0 10899.0 10900.5 10903.0 10905.0 10905.0 10907.0 10908.0 10912.5 10913.5 10914.5 10920.5 10921.5 10928.5 10929.5 10940.5 10940.5 10947.0 10947.0 10947.5 10948.0 10950.0 10951.0 10954.0 10954.5 10955.0 10981.0 10982.0 10998.0 10998.0 11045.5 11047.5 11049.5 11050.0 11052.0 11051.0 11052.5 STOP DEPTH 12115.0 12127.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH SGMA 10685.5 10733.5 10743.5 10761.5 10788.0 10810.5 10824.0 10843.0 10867.5 10899.5 10908.5 10913.5 10914.5 10915.0 10921.0 10921.5 10928.5 10929.0 10949.5 10950.0 10954.0 11049.5 11050.0 11050.5 11053.0 11054.0 11064.0 11069.5 11071.5 11077.0 11079.0 11080.0 11083.0 11083.5 11094.5 11095.0 11095.5 11101.0 11101.5 11105.5 11106.0 11106.5 11116.0 11117.0 11128.5 11129.0 11142.5 11176.0 11192.0 11193.5 11194.0 11194.5 11196.0 11201.0 11201.5 11203.5 11204.5 11205.5 11206.0 11211.0 11218.0 11226.0 11228.0 11240.5 11241.5 11268.0 11271.5 11272.5 11274.5 11283.5 11285.5 11286.0 11286.5 11287.5 11321.5 11323.0 11324.0 11338.5 11345.0 11346.0 11346.5 11347.0 11350.5 11355.5 11054.5 11055.0 11064.5 11072.5 11080.0 11082.0 11082.5 11086.0 11095.5 11096.0 11097.0 11108.0 11143.5 11178.0 11219.5 11230.0 11242.5 11276.5 11285.0 11287.5 11322.0 11322.5 11337.0 11345.0 11071.0 11083.5 11101.5 11102.5 11106.5 11107.5 11118.5 11119.5 11130.0 11130.5 11194.5 11196.0 11197.0 11197.5 11198.0 11203.0 11204.0 11206.0 11206.5 11207.5 11208.5 11213.5 11228.0 11243.5 11270.5 11274.0 11274.5 11287.5 11288.0 11288.5 11289.5 11321.0 11322.5 11323.0 11337.5 11347.5 11348.0 11349.0 11352.5 11358.5 11356.5 11359.5 11362.0 11365.0 11362.5 11366.0 11367.5 11369.0 11379.0 11382.5 11381.0 11383.5 11404.5 11407.0 11405.5 11407.0 11417.0 11420.0 11430.0 11433.0 11430.5 11432.5 11434.0 11436.0 11435.0 11436.5 11435.5 11437.5 11441.5 11443.5 11442.5 11444.0 11446.5 11448.0 11453.5 11454.5 11456.5 11457.5 11457.5 11458.0 11458.0 11458.5 11464.0 11465.0 11467.0 11468.0 11468.0 11468.5 11496.0 11496.5 11508.5 11509.5 11512.5 11513.5 11513.5 11514.0 11536.0 11536.0 11536.5 11535.5 11539.0 11538.0 11539.5 11539.0 11545.5 11546.0 11548.5 11548.5 11549.0 11549.5 11550.0 11549.5 11552.0 11552.5 11552.5 11553.0 11553.0 11553.0 11554.0 11554.0 11553.5 11555.0 11554.0 11555.0 11554.5 11556.0 11555.0 11556.5 11555.5 11557.5 11559.0 11560.5 11572.5 11574.5 11573.5 11575.0 11578.0 11577.0 11581.5 11583.0 11582.5 11583.5 11588.5 11589.5 11589.5 11590.0 11590.0 11590.5 11590.5 11591.5 11591.5 11590.5 11592.0 11591.5 11593.0 11592.5 11594.0 11593.0 11596.5 11595.5 11597.0 11596.5 11602.0 11603.0 11604.0 11609.0 11621.5 11622.0 11625.0 11629.0 11634.0 11634.5 11635.0 11638.5 11642.5 11643.5 11644.0 11644.5 11645.5 11647.5 11648.0 11648.5 11651.0 11652.5 11657.0 11657.5 11661.5 11662.0 11663.5 11664.0 11671.5 11673.0 11728.5 11739.5 11740.0 11740.5 11750.5 11751.0 11751.5 11752.5 11753.0 11762.5 11764.0 11764.5 11772.5 11773.5 11774.0 11780.5 11785.5 11786.0 11788.0 11789.0 11789.5 11790.0 11790.5 11791.5 11793.5 11794.0 11798.0 11798.5 11799.0 11802.5 11656.5 11657.5 11673.0 11739.5 11740.5 11741.0 11752.5 11764.0 11780.0 11802.0 11603.0 11603.5 11604.5 11610.0 11622.5 11623.5 11626.5 11631.0 11636.0 11637.0 11638.0 11641.5 11647.0 11648.0 11649.0 11649.5 11650.0 11652.0 11652.5 11653.0 11655.5 11656.0 11665.0 11666.0 11667.5 11668.5 11676.0 11729.5 11751.5 11752.0 11753.0 11754.0 11765.0 11766.0 11774.0 11775.5 11776.0 11785.5 11786.5 11788.5 11789.0 11789.5 11790.5 11791.0 11791.5 11793.5 11794.5 11798.5 11800.5 11801.5 11807.0 11807.5 11808.0 11814.5 11816.5 11817.5 11820.5 11821.0 11823.0 11855.5 11871.5 11872.5 11900.0 11924.5 11925.0 11926.0 11927.0 11934.0 11940.0 11940.5 11941.0 1194'2.0 11946.0 11948.0 11949.0 11950.5 11957.5 11958.5 11961.5 11968.0 11970.0 11975.5 11977.5 11978.5 11981.0 11986.0 11987.0 11988.5 12028.5 12055.0 12062.5 12107.5 12126.5 12130.0 $ REMARKS: 11807.0 11807.5 11810.0 11816.5 11818.5 11819.0 11819.5 11820.5 11822.5 11856.0 11874.0 11874.0 11901.5 11929.0 11929.5 11930.0 11930.5 11937.5 11943.5 11944.5 11944.0 11944.5 11950.0 11950.5 11951.0 11952.5 11958.0 11958.5 11966.0 11972.5 11970.0 11981.5 11983.5 11984.5 11980.0 11985.0 11985.5 11987.0 12031.0 12059.5 12065.5 12109.5 12130.0 12130.0 BASE WATER PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT / ? ?MATCH2A. OUT /??MATCH2B. OUT $ : BP EXPLORATION : E - 24A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CSLS PDK 68 1 CU 4 6 LS PDK 68 1 CPS 4 7 MSD PDK 68 1 CU 4 8 RATO PDK 68 1 4 9 RBOR PDK 68 1 4 10 RICS PDK 68 1 4 11 RIN PDK 68 1 4 12 SGMA PDK 68 1 CU 4 13 SGMB PDK 68 1 CU 4 14 SS PDK 68 1 CPS 4 15 SGNT PDK 68 1 CU 4 16 PHI PDK 68 1 PU-S 4 GAPI 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 64 * DATA RECORD (TYPE# 0) 958 BYTES * Total Data Records: 207 Tape File Start Depth = 10685.000000 Tape File End Depth = 12130.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 49148 datums Tape Subfile: 3 502 records... Minimum record length: 62 bytes Maximum record length: 958 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10688.0 10700.0 STOP DEPTH 11078.0 11090.0 (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GRCH 10698.5 10701.0 10703.5 10706.0 10704.5 10706.5 10706.0 10706.5 10708.5 10713.5 10714.5 10715.5 10716.5 10716.0 10719.5 10718.0 10721.5 10723.0 10725.5 10724.0 10726.5 10725.0 10727.0 10731.0 10749.0 10758.5 10760.5 10759.5 10761.0 10760.5 10765.0 10766.0 10769.0 10770.5 10769.5 10771.5 10770.5 10772.5 10771.5 10773.0 10774.5 10775.5 10781.0 10782.5 10782.0 10783.0 10782.5 10783.5 10786.5 10787.5 10788.0 10789.5 10792.5 10794.0 10793.5 10794.5 10794.5 10796.5 10796.5 10797.5 10798.5 SGMA 10707.5 10734.0 10751.0 10761.0 10761.5 10766.0 10766.5 10771.0 10771.5 10774.5 10775.0 10786.0 10786.5 10795.5 10796.0 10796.5 10800.0 10800.5 10801.0 10802.0 10803.0 10809.0 10809.5 10814.0 10819.0 10820.0 10822.5 10837.5 10879.5 10884.5 10893.0 10899.0 10905.0 10905.5 10906.5 10907.0 10908.0 10915.5 10916.0 10917.5 10918.5 10924.5 10925.5 10937.0 10938.0 10938.5 10939.0 10940.0 10940.5 10941.0 10942.0 10945.5 10949.5 10950.5 10951.0 10952.0 10952.5 10996.5 11002.5 11051.0 11053.0 11053.5 11054.5 11066.0 11066.5 11067.5 11069.0 11079.0 11088.0 11095.0 $ REMARKS: 10802.0 10802.5 10811.0 10815.0 10885.5 10894.5 10906.5 10907.0 10908.0 10939.5 10940.5 10941.5 10942.0 10942.5 10950.0 10950.5 10951.0 10951.5 10952.0 10996.5 11002.5 11054.0 11054.5 11055.0 11066.5 11067.5 11068.5 11070.0 10798.0 10799.0 10800.5 10801.0 10807.0 10808.0 10817.5 10818.0 10820.5 10836.5 10882.0 10900.5 10906.5 10907.0 10916.0 10917.0 10918.5 10919.0 10925.0 10925.5 10937.0 10937.5 10938.5 10939.0 10939.5 10945.5 11052.0 11080.0 11088.0 11095.0 BORAX PASS 1: 20 BBLS AWAY. ALL PDK CURVES WERE SHIFTED WITH SGMA. /? ?MATCH3A. OUT /??MATCH3B. OUT $ CN : BP EXPLORATION WN : E - 24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CSLS PDK 68 1 CU 4 6 LS PDK 68 1 CPS 4 7 MSD PDK 68 1 CU 4 8 RATO PDK 68 1 4 9 RBOR PDK 68 1 4 10 RICS PDK 68 1 4 11 RIN PDK 68 1 4 12 SGMA PDK 68 1 CU 4 13 SGMB PDK 68 1 CU 4 14 SS PDK 68 1 CPS 4 4 00 201 24 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 56 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 52 Tape File Start Depth = 10685.000000 Tape File End Depth = 11095.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 52653 datums Tape Subfile: 4 177 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate PASS NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10688.0 10700.0 BASELINE DEPTH GRCH 10698.5 10700.5 10704.0 10706.0 10705.0 10706.5 10706.0 10707.5 10707.0 10708.0 10716.0 10718.0 10717.0 10719.5 10717.5 10720.0 10718.5 10721.0 10721.5 10723.0 10725.0 10723.5 10725.5 10724.5 10726.0 10725.5 10726.5 10727.5 10728.0 10736.0 10737.0 10739.5 10740.5 10750.5 10751.5 10755.0 10756.5 10756.0 10757.0 10764.5 10765.5 10765.0 10766.5 10767.0 10768.5 10768.0 10769.0 10768.5 10769.5 10769.0 10770.5 10769.5 10771.5 10770.5 10772.5 10771.5 10773.0 10772.0 10773.5 10773.0 10774.0 STOP DEPTH 11078.0 11090.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH SGMA 10697.5 10706.0 10720.0 10722.5 10723.5 10727.5 10728.0 10729.0 10730.0 10738.0 10738.5 10741.0 10741.5 10751.5 10752.0 10767.5 10768.0 10770.5 10771.0 files. 10774.0 10775.0 10781.0 10782.0 10782.5 10786.5 10787.0 10788.0 10788.5 10789.0 10789.5 10790.0 10793.0 10793.5 10794.5 10795.5 10796.5 10797.0 10797.5 10798.0 10799.0 10801.0 10801.5 10802.5 10803.5 10807.5 10808.0 10809.0 10810.0 10815.0 10818.0 10819.0 10822.0 10884.5 10885.0 10886.0 10888.0 10890.0 10890.5 10891.0 10896.0 10896.5 10897.0 10897.5 10898.5 10905.0 10906.0 10910.0 10911.0 10913.0 10915.0 10919.5 10921.0 10923.0 10923.5 10924.5 10926.5 10927.0 10929.5 10930.5 10782.0 10782.5 10783.0 10786.0 10788.5 10789.5 10790.5 10793.5 10794.5 10795.5 10796.0 10797.0 10798.0 10798.5 10799.5 10809.0 10810.0 10811.0 10811.5 10816.0 10896.5 10897.0 10898.0 10898.5 10899.0 10906.5 10921.5 10922.0 10922.5 10924.5 10925.5 10773.5 10774.0 10786.0 10786.5 10787.5 10795.5 10796.0 10796.5 10798.5 10799.5 10800.5 10801.0 10815.5 10816.0 10819.0 10883.0 10883.5 10884.0 10886.0 10889.0 10889.5 10892.0 10897.5 10898.0 10905.5 10906.0 10910.0 10910.5 10912.5 10915.0 10919.5 10920.5 10929.0 10929.5 10939.0 10943.0 10943.5 10944.0 10945.0 10945.5 10946.0 10946.5 10947.0 10947.5 10948.5 10949.0 10949.5 10951.0 10952.0 10953.0 10954.0 10982.5 10984.5 10996.5 10998.5 10999.5 11001.5 11002.5 11003.0 11057.5 11060.5 11063.5 11064.0 11064.5 11065.0 11065.5 11066.0 11067.0 11067.5 11068.0 11068.5 11069.0 11071.0 $ REMARKS: 10938.5 10942.5 10943.5 10944.0 10944.5 10944.5 10945.5 10945.0 10946.5 10945.5 10947.5 10948.0 10948.5 10949.5 10949.5 10952.0 10950.0 10952.5 10953.5 10981.0 10983.0 10997.5 10999.5 11000.0 11002.0 11002.5 11003.0 11057.5 11060.5 11064.0 11065.0 11065.0 11066.0 11066.0 11068.0 11068.5 11068.0 11069.0 11069.0 11069.5 11070.5 11070.0 11071.0 11070.5 11074.0 BORAX PASS 2:44 BBLS AWAY. ALL PDK CURVES WERE SHIFTED WITH SGMA. / ? ?MATCH4A. OUT /??MATCH4B. OUT $ CN : BP EXPLORATION WN : E- 24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 MSD PDK 68 1 CU 8 RATO PDK 68 1 9 RBOR PDK 68 1 10 RICS PDK 68 1 11 RIN PDK 68 12 SGMA PDK 68 1 CU 13 SGMB PDK 68 1 CU 14 SS PDK 68 1 CPS 4 4 00 201 24 1 4 4 00 201 24 4 4 00 201 24 1 4 4 00 201 24 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 4 4 00 201 24 1 56 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 52 Tape File Start Depth = 10685.000000 Tape File End Depth = 11095.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61464 datums Tape Subfile: 5 222 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 10688.0 11078.0 10700.0 11090.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 10698.5 10700.5 10703.5 10705.5 10704.5 10706.0 10705.0 10706.5 10706.0 10707.0 10706.5 10707.5 10707.0 10706.0 10715.5 10717.0 10718.5 10720.0 10719.5 10720.5 10721.5 10722.5 10722.0 10723.5 10722.5 10724.5 10723.0 10725.0 10727.5 10729.5 10728.5 10730.0 10737.0 10739.0 10738.0 10739.5 10740.0 10741.5 10741.0 10742.0 10741.5 10743.0 10744.0 10745.5 10745.0 10746.0 10750.5 10751.5 10751.5 10752.0 10766.5 10767.0 10767.5 10767.5 10771.5 10771.5 10772.5 10774.0 10772.0 10773.5 10774.5 10775.0 10774.5 10776.0 10775.0 10786.0 10787.0 10787.0 10787.5 10787.5 10788.5 10792.0 10793.0 10793.0 10793.5 in separate files. EQUIVALENT UNSHIFTED DEPTH SGMA 10697.5 10795.5 10796.5 10797.5 10798.5 10799.0 10799.5 10802.5 10803.5 10810.0 10820.0 10821.0 10821.5 10822.0 10823.0 10868.0 10869.5 10870.5 10873.5 10875.0 10877.0 10882.5 10883.0 10886.5 10887.5 10888.0 10889.0 10892.0 10895.0 10896.0 10897.0 10902.0 10905.0 10906.0 10920.5 10921.5 10930.5 10931.0 10931.5 10934.0 10935.0 10940.5 10943.0 10943.5 10944.0 10945.0 10945.5 10948.5 10949.0 10949.5 10950.0 10951.0 10952.0 10952.5 10953.0 10994.5 10996.0 10996.5 11003.5 11047.0 11047.5 10796.0 10797.5 10799.5 10800.5 10811.5 10877.0 10896.0 10903.0 10939.5 10942.0 10943.0 10943.5 10944.0 10945.0 10948.0 10948.5 10951.0 10952.0 10952.5 10993.5 10995.0 10996.0 11003.0 11048.0 11048.5 10796.5 10797.5 10800.5 10801.0 10817.5 10818.0 10818.5 10819.5 10820.5 10868.0 10869.5 10870.0 10873.0 10879.0 10884.5 10886.5 10890.0 10890.5 10891.5 10892.5 10893.0 10897.0 10897.5 10905.5 10906.0 10920.5 10921.0 10930.0 10930.5 10931.0 10933.5 10934.0 10948.0 10948.5 10949.5 10950.0 11048.5 11051.5 11054.0 11057.5 11058.0 11058.5 11059.0 11060.0 11060.5 11061.0 11066.5 11067.0 11067.5 11069.0 11070.0 11070.5 11071.0 11072.0 11077.0 11080.0 11080.5 $ REMARKS: 11049.0 11052.0 11052.5 11056.5 11056.5 11057.5 11058.0 11058.5 11059.0 11060.0 11065.5 11067.0 11067.5 11068.0 11068.5 11069.0 11070.0 11070.5 11073.0 11076.0 11079.0 11076.5 11079.5 BORAX PASS 3:100 BBLS AWAY. ALL PDK CURVES WERE SHIFTED WITH SGMA. / ? ?MATCH5A. OUT / ? ?MATCH5B . OUT $ CN : BP EXPLORATION WN : E - 24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: 1 2 3 4 5 6 7 8 9 10 11 Name Tool Code Samples Units GRCH PDK 68 1 BIF PDK 68 1 BKL PDK 68 1 BKS PDK 68 1 CSLS PDK 68 1 LS PDK 68 1 MSD PDK 68 1 RATO PDK 68 1 RBOR PDK 68 1 RICS PDK 68 1 RIN PDK 68 1 GAPI CPS CPS CU CPS CU API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 4 00 201 24 1 12 SGMA PDK 68 1 13 SGMB PDK 68 1 14 SS PDK 68 i * DATA RECORD (TYPE# 0) Total Data Records: 52 CU CU CPS 4 4 00 201 24 4 4 00 201 24 4 4 00 201 24 56 966 BYTES * Tape File Start Depth = 10685.000000 Tape File End Depth = 11095.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 64969 datums Tape Subfile: 6 204 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10829.0 PDK 10841.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 12077.0 12089.0 14-JAN-95 FSYS REV. J001 VER. 1.1 1347 14-JAN-95 12166.0 12142.0 10600.0 12130.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC TEMP TEMPERATURE $ TOOL NUMBER 2725XA 2324XA 2120XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER' S CASING DEPTH (FT): .00O 12240.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PROD FLD/SEAH20/BORX .00 .0 187.0 0 .0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): .0 BASE NORMALIZING WINDOW (FT): .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 2100 FAR COUNT RATE HIGH SCALE (CPS) : 7100 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS) : 0 TOOL STANDOFF (IN): .0 REMARKS: FLOWING PASS. THE HIGH SCALE VALUE FOR THE NEAR COUNTS IS 120,000 CPS. $ CN : BP EXPLORATION WN : E - 24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 21 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 MON PDK 68 1 CPS 4 11 MSD PDK 68 1 CU 4 12 RATO PDK 68 1 4 13 RBOR PDK 68 1 4 14 RICS PDK 68 1 4 '15 RIN PDK 68 I 4 16 SGMA PDK 68 1 CU 4 17 SGMB PDK 68 1 CU 4 18 SPD PDK 68 1 F/MN 4 19 SS PDK 68 1 CPS 4 20 TEN PDK 68 1 LB 4 21 SGNT PDK 68 1 CU 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 71 162 89 6 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 52 386 28 5 4 05 626 89 6 4 17 922 28 5 4 00 201 24 1 84 * DATA RECORD (TYPE# 0) 974 BYTES * Total Data Records: 459 Tape File Start Depth = 10829.000000 Tape File End Depth = 12089.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 172367 datums Tape Subfile: 7 537 records... Minimum record length: 62 bytes Maximum record length: 974 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10689.0 PDK 10701.0 $ LOG HEADER DATA STOP DEPTH 12117.0 12129.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 14-JAN-95 FSYS REV. J001 VER. 1.1 1629 14-JAN-95 12166.0 12142.0 10600.0 12130.0 1500.0 YES TOOL NUMBER 2725XA 2324XA 2120XA .000 12240.0 .0 PROD FLD/SEAH20/BORX .00 .0 187.0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): .0 BASE NORMALIZING WINDOW (FT): .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 2100 FAR COUNT RATE HIGH SCALE (CPS): 7100 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HIGH SCALE (CPS) : 0 TOOL STANDOFF (IN): .0 REMARKS: BASE WATER PASS. THE HIGH SCALE VALUE FOR THE NEAR COUNTS IS 120,000 CPS. $ CN : BP EXPLORATION WN : E - 24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 I CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 MON PDK 68 1 CPS 4 11 MSD PDK 68 1 CU 4 12 RATO PDK 68 1 4 13 RBOR PDK 68 1 4 14 RICS PDK 68 1 4 15 RIN PDK 68 1 4 16 SGMA PDK 68 1 CU 4 17 SGMB PDK 68 1 CU 4 18 SPD PDK 68 i F/MN 4 19 SS PDK 68 1 CPS 4 20 TEN PDK 68 1 LB 4 21 SGNT PDK 68 1 CU 4 22 PHI PDK 68 1 PU-S 4 4 06 511 09 0 4 00 201 24 1 4 39 705 61 6 4 74 169 61 6 4 92 630 79 6 4 00 201 24 1 4 00 201 24 1 4 71 162 89 6 4 71 162 89 6 4 32 125 68 0 4 00 201 24 1 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 23 260 40 0 4 96 761 61 6 4 00 201 24 1 4 52 386 28 5 4 05 626 89 6 4 17 922 28 5 4 00 201 24 1 4 00 201 24 1 88 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 524 Tape File Start Depth = 10689.000000 Tape File End Depth = 12129.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 197473 datums Tape Subfile: 8 602 records... Minimum record length: 62 bytes Maximum record length: 1018 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10682.0 PDK 10694.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 11078.0 11090.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 14-JAN-95 FSYS REV. J001 VER. 1.1 1844 14-JAN-95 12'166.0 12142.0 10600.0 12130.0 1500.0 YES TOOL NUMBER 2725XA 2324XA 2120XA .O00 12240.0 .0 PROD FLD/SEAH20/BORX .00 .0 187.0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): .0 BASE NORMALIZING WINDOW (FT): .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 2100 FAR COUNT RATE HIGH SCALE (CPS) : 7100 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HIGH SCALE (CPS): 0 TOOL STANDOFF (IN): .0 REMARKS: BORAX PASS 1:20 BBLS AWAY. THE HIGH SCALE VALUE FOR THE NEAR COUNTS IS 120,000 CPS. $ CN : BP EXPLORATION WN : E - 24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 MON PDK 68 1 CPS 4 11 MSD PDK 68 1 CU 4 12 RATO PDK 68 1 4 13 RBOR PDK 68 1 4 14 RICS PDK 68 1 4 15 RIN PDK 68 i 4 16 SGMA PDK 68 I CU 4 17 SGMB PDK 68 1 CU 4 18 SPD PDK 68 1 F/MN 4 19 SS PDK 68 1 CPS 4 20 TEN PDK 68 1 LB 4 4 06 511 09 4 00 201 24 4 39 705 61 4 74 169 61 4 92 630 79 4 00 201 24 4 00 201 24 4 71 162 89 4 71 162 89 4 32 125 68 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 4 52 386 28 4 05 626 89 4 17 922 28 0 1 6 6 6 1 1 6 6 0 1 0 0 0 0 6 1 5 6 5 80 * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records: 137 Tape File Start Depth = 10682.000000 Tape File End Depth = 11090.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 206661 datums Tape Subfile: 9 215 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10684.0 PDK 10696.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 11079.0 11091.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX. ' MATRIX DENSITY: HOLE CORRECTION (IN): 14-JAN-95 FSYS REV. J001 VER. 1.1 1909 14-JAN-95 12166.0 12142.0 10600.0 12130.0 1500.0 YES TOOL NUMBER 2725XA 2324XA 2120XA .0OO 12240.0 .0 PROD FLD/SEAH20/BORX .00 .0 187.0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): .0 BASE NORMALIZING WINDOW (FT): .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 2100 FAR COUNT RATE HIGH SCALE (CPS): 7100 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 0 TOOL STANDOFF (IN): .0 REMARKS: BORAX PASS 2:44 BBLS AWAY. THE HIGH SCALE VALUE FOR THE NEAR COUNTS IS 120,000 CPS. $ CN : BP EXPLORATION WN : E - 24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 MON PDK 68 1 CPS 4 11 MSD PDK 68 1 CU 4 12 RATO PDK 68 1 4 13 RBOR PDK 68 1 4 14 RICS PDK 68 i 4 15 RIN PDK 68 I 4 16 SGMA PDK 68 1 CU 4 17 SGMB PDK 68 1 CU 4 18 SPD PDK 68 1 F/MN 4 19 SS PDK 68 1 CPS 4 20 TEN PDK 68 1 LB 4 4 06 511 09 4 00 201 24 4 39 705 61 4 74 169 61 4 92 630 79 4 00 201 24 4 00 201 24 4 71 162 89 4 71 162 89 4 32 125 68 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 4 52 386 28 4 05 626 89 4 17 922 28 0 1 6 6 6 1 1 6 6 0 1 0 0 0 0 6 1 5 6 5 8O * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 136 Tape File Start Depth = 10684.000000 Tape File End Depth = 11091.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 231683 datums Tape Subfile: 10 214 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 11 is type: LIS FILE HEADER FILE NUMBER: 10 RAW CURVES Curves and log header data for each run in separate files; raw background pass in last file. PASS NUMBER: 5 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10679.5 PDK 10691.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 11080.0 11092.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PDK PDK-100 CCL CASING COLLAR LOC TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 14-JAN-95 FSYS REV. J001 VER. 1.1 1936 14-JAN-95 12166.0 12142.0 10600.0 12130.0 1500.0 YES TOOL NUMBER 2725XA 2324XA 2120XA .0O0 12240.0 .0 PROD FLD/SEAH20/BORX .00 .0 187.0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): .0 BASE NORMALIZING WINDOW (FT): .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) .' 2100 FAR COUNT RATE HIGH SCALE (CPS) : 7100 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS) : 0 TOOL STANDOFF (IN): .0 REMARKS: BORAX PASS 3:100 BBLS AWAY. THE HIGH SCALE VALUE FOR THE NEAR COUNTS IS 120,000 CPS. $ CN : BP EXPLORATION WN : E - 24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 MON PDK 68 1 CPS 4 11 MSD PDK 68 1 CU 4 12 RATO PDK 68 1 4 13 RBOR PDK 68 1 4 14 RICS PDK 68 i 4 15 RIN PDK 68 i 4 16 SGMA PDK 68 1 CU 4 17 SGMB PDK 68 1 CU 4 18 SPD PDK 68 1 F/MN 4 19 SS PDK 68 1 CPS 4 20 TEN PDK 68 i LB 4 4 06 511 09 4 00 201 24 4 39 705 61 4 74 169 61 4 92 630 79 4 00 201 24 4 00 201 24 4 71 162 89 4 71 162 89 4 32 125 68 4 00 201 24 4 23 260 40 4 23 260 40 4 23 260 40 4 23 260 40 4 96 761 61 4 00 201 24 4 52 386 28 4 05 626 89 4 17 922 28 80 * DATA RECORD (TYPES 0) 1014 BYTES * Total Data Records: 138 Tape File Start Depth = 10679.500000 Tape File End Depth = 11092.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 241333 datums Tape Subfile: 11 216 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 12 is type: LIS 95/ 1/31 01 **** REEL TRAILER **** 95/ 1/31 01 Tape Subfile: 12 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 31 JAN 95 4:29p Elapsed execution time = 21.37 seconds. SYSTEM RETURN CODE = 0 .pe Su~file 2 is type: LIS TAPE HEADER PRUDHOE BAY I/NIT MWD/MAD LOGS WELL NAME: API NI3MBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 18 6562.00 R. FRENCH J. GAFNEY E--24A 5(]0292176901 BI? EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 18-JAN-96 ~4D RUN 19 B. JAHN J. GAFNEY MWD RUN 20 B. JAHN J. GAFNEY MWD RUN 21 JOB NUMBER: LOGGING ENGINEER: OPER3tTOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: B. JAHN J. GAFNEY WELL CASING RECORD M~D RUN 22 B. JAHN J. GAFNEY MWD RUN 23 B. JAHN D. WESTER llN 14E 1786 64.68 63.13 30.10 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 7.000 PRODUCTION STRING 6.000 REMARKS: MWD - GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. 9839.0 12239.0 WINDOW MILLED IN 7" CASING FROM 9839 - 9889'. MWD RUNS 1, 2, 8, 16, & 17; NO FOOTAGE WAS MADE ON THESE RUNS. POLISHED CEMENT PLUG AT KOP. ALL OTHER RUNS ARE DIRECTIONAL - GAMMA RAY (NGP) . THIS WELL, E-24A, IS FROM MWD RUNS 18 - 23. THE WELL E-24A PB1 IS FROM MWD RUNS 3 - 7. THE WELL E-24A PB2 IS FROM MWD RUNS 9 - 15. NO DEPTH SHIFTS WERE DONE AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 9790.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD $ REMARKS: STOP DEPTH 12180.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 18 9840.0 10224.0 19 10224.0 10323.0 20 10323.0 10822.0 21 10822.0 11086.0 22 11086.0 11687.0 23 11687.0 12238.0 MERGED MAIN PASS. GAMMA RAY DATA FROM 10346 - 10361' & FROM 10391 - 10756' IS FROM MAD PASSES #2 & #1 (AFTER MWD RUN 20) RESPECTIVELY. CN : BP EXPLORATION WN : E-24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 59 Tape File Start Depth = 12239.000000 Tape File End Depth = 9790.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14698 datums Tape Subfile: 2 157 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: START DEPTH 10341.0 STOP DEPTH 10768.0 MAD RUN NO. MAD PASS NO. MERGE TOP 20 2 10401.0 20 1 10446.0 MAD PASSES #1 & #2 RUN AFTER MWD RUN 20. $ MERGE BASE 10441.0 10824.0 CN : BP EXPLORATION WN : E-24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECOR'D (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MAD 68 1 AAPI 4 2 RATE MAD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 95 995 99 1 4 95 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 12 Tape File Start Depth = 10825.000000 Tape File End Depth = 10340.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: _~ Code: 68 2914 datums Tape Subfile: 3 36 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes lape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 18 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9790.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIM UMANGLE: STOP DEPTH 10175.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 18. 03-NOV-94 MWD 2.19 1.09 MEMORY 10224.0 9840.0 10224.0 0 .0 .0 TOOL NUMBER 6.O00 9839.0 KCL/BIOPOLYMER 9.20 94.0 9.8 32000 5.0 .000 .0 .000 .0 .000 .0 .000 .0 .00 .000 .0 0 CN : BP EXPLORATION WN : E-24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 10225.000000 Tape File End Depth = 9790.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17312 datums Tape Subfile: 4 74 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes lape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 19 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10165.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10263.0 04-NOV-94 MWD 2.19 1.09 MEMORY 10323.0 10224.0 10323.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL/BIOPOLYMER 9.20 95.0 9.6 32500 5.0 .000 .0 .000 .0 .000 .0 .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 19. CN : BP EXPLORATION WN : E-24A FN : PRUDHOE BAY COLIN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10325.000000 Tape File End Depth = 10160.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3908 datums Tape Subfile: 5 67 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ~fape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 20 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10264.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10391.0 06-NOV-94 MWD 2.19 1.09 MEMORY 10822.0 10323.0 10822.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL/BIOPOLYMER 9.20 76.0 9.8 34500 4.8 .000 .0 .000 .0 .000 .0 .000 ,0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 20. CN : BP EXPLOP~ATION WN : E-24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 O1 1 4 90 810 O1 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10455.000000 Tape File End Depth = 10260.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 18486 datums Tape Subfile: 6 68 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes ±'ape Subfile 7 is type: LIS FILE HEADER FILE NIIMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 21 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10756.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10949.0 07 -NOV- 94 MWD 2.19 1.09 MEMORY 11086.0 10822.0 11086.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL/BIOPOLYMER 9.20 77.0 9.6 37500 4.4 .000 .0 .000 .0 .000 .0 .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 21. CN : BP EXPLORATION WN : E-24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 11015.000000 Tape File End Depth = 10750.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5502 datums Tape Subfile: 7 70 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 22 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11027.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11628.0 09-NOV-94 MWD 2.19 1.09 MEMORY 11687.0 11086.0 11687.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL/BIOPOLYMER 9.20 81.0 10.0 35000 4.8 .000 .0 .000 .0 .000 .0 .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 22. CN : BP EXPLORATION WN : E-24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 16 Tape File Start Depth = 11690.000000 Tape File End Depth = 11025.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 22480 datums Tape Subfile: 8 79 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 23 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11628.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12180.0 il-NOV-94 MWD 2.19 1.09 MEMORY 12238.0 11687.0 12238.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL/BIOPOLYMER 9.20 90.0 9.7 28500 4.6 .000 .0 .000 .0 .000 .0 .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 23. CN : BP EXPLORATION WN : E-24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 15 Tape File Start Depth = 12239.000000 Tape File End Depth = 11625.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9190 datums Tape Subfile: 9 78 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 20 MAD PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10386.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUMANGLE: STOP DEPTH 10768.0 06-NOV-94 MWD 2.19 1.09 MEMORY 10822.0 10386.0 10768.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL/B IOPOLYMER 9.20 76.0 9.8 34500 4.8 .000 .0 .000 .0 .000 .0 .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 · ~.EMARKS: MAD PASS 1, LOGGED AFTER MWD RUN 20. $ CN : BP EXPLORATION WN : E-24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MAD 68 1 AAPI 4 2 SRAT MAD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 95 995 99 1 4 95 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 10825.000000 Tape File End Depth = 10385.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 25124 datums Tape Subfile: 10 75 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes _ape Subfile 11 is type: LIS FILE HEADER FILE NUMBER: 10 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 20 MAD PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10341.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10381.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT ~ CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : 06-NOV-94 MWD 2.19 1.09 MEMORY 10822.0 10341.0 10381.0 0 .0 .0 TOOL NUMBER 6.000 9839.0 KCL/BIOPOLYMER 9.20 76.0 9.8 34500 4.8 .000 .0 .000 .0 .000 .0 .000 .0 .00 .000 .0 0 ~tEMARKS: MAD PASS 2, LOGGED AFTER MWD RUN 20. $ CN : BP EXPLORATION WN : E-24A FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MAD 68 1 AAPI 4 2 SRAT MAD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 95 995 99 1 4 95 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10445.000000 Tape File End Depth = 10340.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9824 datums Tape Subfile: 11 67 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes _ape Subfile 12 is type: LIS 96/ z/20 01 **** REEL TRAILER **** 96 / 1/22 01 Tape Subfile: 12 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 22 JAN 96 11:32a Elapsed execution time = 1.92 seconds. SYSTEM RETURN CODE = 0 Tape'Sub~ile 2 is type: LIS TAPE HEADER PRUDHOE BaY I/NIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 3 6563.00 R. FRENCH J. ROBERTSON E-24A PB1 500292176970 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 19-JAN-96 MWD RUN 4 R. FRENCH J. ROBERTSON MWD RUN 5 R. FRENCH J. ROBERTSON MWD RUN 6 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: R. FRENCH J. ROBERTSON WELL CASING RECORD MWD RUN 7 R. FRENCH J. ROBERTSON 6 liN 14E 1786 501 64.68 63.13 30.10 MICROFILMED OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING 7.000 PRODUCTION STRING 6.000 REMARKS: MWD - GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. 9839.0 10632.0 WINDOW MILLED IN 7" CASING FROM 9839 - 9889'. MWD RUNS 1, 2, 8, 16, & 17; NO FOOTAGE WAS MADE ON THESE RUNS. POLISHED CEMENT PLUG AT KOP. ALL OTHER RUNS ARE DIRECTIONAL - GAMMA RAY (NGP) . THIS WELL, E-24A PB1, IS FROM MWD RUNS 3 - 7. THE WELL E-24A PB2 IS FROM MWD RUNS 9 - 15. THE WELL E-24A IS FROM MWD RUNS 18 - 23. NO DEPTH SHIFTS WERE DONE AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 9656.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ REMARKS: STOP DEPTH 10583.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 3 9780.0 10080.0 4 10080.0 10282.0 5 10282.0 10341.0 6 10341.0 10396.0 7 10396.0 10632.0 MERGED MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION : E-24A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 24 ~pe File Start Depth = 10632.000000 Tape File End Depth = 9656.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5860 datums Tape Subfile: 2 118 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9656.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10025.0 15-OCT-94 MWD 2.19 1.09 MEMORY 10080.0 9780.0 10080.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: BIOPOLYMER 9.00 82.0 11.0 31000 5.6 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 3. CN : BP EXPLORATION WN : E-24A PB1 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 10085.000000 Tape File End Depth = 9656.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 2578 datums Tape Subfile: 3 74 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 R_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10014.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10216.0 16-OCT-94 MWD 2.19 1.09 MEMORY 10282.0 10080.0 10282.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: BIOPOLYMER 9.10 80.0 11.0 30000 6.0 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 4. CN : BP EXPLORATION WN : E-24A PB1 FN : PRUDHOE BAY COLIN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10285.000000 Tape File End Depth = 10010.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7514 datums Tape Subfile: 4 70 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10212.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUMkNGLE: STOP DEPTH 10292.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 5. 16-OCT-94 MWD 2.19 1.09 MEMORY 10341.0 10282.0 10341.0 0 .0 .0 TOOL NUMBER 6.000 9839.0 BIOPOLYMER 9.05 75.0 10.2 31500 5.6 .000 .000 .000 .000 .0 .0 ,0 .0 .00 .000 .0 0 CN : BP EXPLORATION WN : E-24A PB1 FN : PRUDHOE BAY COI/N : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10345.000000 Tape File End Depth = 10210.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3392 datums Tape Subfile: 5 67 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10281.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10346.0 17-0CT-94 MWD 2.19 1.09 MEMORY 10396.0 10341.0 10396.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: BIOPOLYMER 9.05 74.0 10.1 30000 5.6 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 6. CN : BP EXPLORATION WN : E-24A PB1 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 3 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 Tape File Start Depth = 10400.000000 Tape File End Depth = 10280.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8238 datums Tape Subfile: 6 66 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NI3MBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10346.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MuAXI~ANGLE: STOP DEPTH 10583.0 19-OCT-94 MWD 2.19 1.09 MEMORY 10632.0 10396.0 10632.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTP~ATE AT MT: MUD CAKE AT MT: BIOPOLYMER 9.05 80.0 9.6 31500 5.4 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 7. CN WN FN COUN STAT : BP EXPLORATION : E-24A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10632.000000 Tape File End Depth = 10345.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5118 datums Tape Subfile: 7 70 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 8 is type: LIS 96/ 1/20 01 **** REEL TRAILER **** 96/ 1/22 01 Tape Subfile: 8 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 22 JAN 96 1:28p Elapsed execution time = 1.21 Seconds. SYSTEM RETURN CODE = 0 ~ sUbfile 2 is typ~: L%S TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 3 6564.00 R. FRENCH D. ROBERTSON E-24A PB2 500292176971 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 19-JAN-96 MWD RUN 4 R. FRENCH D. ROBERTSON MWD RUN 9 R. FRENCH D. HEIM JOB NI/MBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 10 R. FRENCH D. HEIM MWD RUN 11 R. FRENCH D. HEIM MWD RUN 12 R. FRENCH D. HEIM MWD RUN 13 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD R. FRENCH D. HEIM 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING MWD RUN 14 OPEN HOLE R. FRENCH D. WESTER REMARKS: 6 liN 14E 1786 501 64.68 63.13 30.10 MWD RUN 15 R. FRENCH D. WESTER MICROFILMED CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 7.000 9839.0 6.000 11719.0 MWD - GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. WINDOW MILLED IN 7" CASING FROM 9839 - 9889'. MWD RUNS 1, 2, 8, 16, & 17; NO FOOTAGE WAS MADE ON THESE RUNS. POLISHED CEMENT PLUG AT KOP. ALL OTHER RUNS ARE DIRECTIONAL - GAMMA RAY (NGP). THIS WELL, E-24A PB2, IS FROM MWD RUNS 3, 4, 9 - 15. KICK-OFF POINT FROM PREVIOUS HOLE, E-24A PB1, IS AT 10200'. THE WELL E-2.4A PB1 IS FROM MWD RUNS 3 - 7. THE WELL E-24A IS FROM MWD RUNS 18 - 23. NO DEPTH SHIFTS WERE DONE AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 9656.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD 3 MWD 4 MWD 9 MWD 10 MWD 11 MWD 12 MWD 13 MWD 14 MWD 15 $ REMARKS: MERGED MAIN PASS. STOP DEPTH 11670.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 9780.0 10080.0 10080.0 10198.0 10198.0 10244.0 10244.0 10259.0 10259.0 10407.0 10407.0 10741.0 10741.0 11210.0 11210.0 11607.0 11607.0 11719.0 CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 50 Tape File Start Depth = 11720.000000 Tape File End Depth = 9656.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 12388 datums Tape Subfile: 2 155 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9656.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIM UMANGLE: STOP DEPTH 10025.0 15-0CT-94 MWD 2.19 1.09 MEMORY 10O8O.O 9780.0 10080.O 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAJ~ GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : TOOL NUMBER 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: B I 0 POLYMER 9.00 82.0 11.0 31000 5.6 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 3 . CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 10085.000000 Tape File End Depth = 9656.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 2578 datums Tape Subfile: 3 74 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes 'rape Subfile 4 is typ~: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10014.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIM UMANGLE: STOP DEPTH 10216.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 4. 16-OCT-94 MWD 2.19 1.09 MEMORY 10282.0 10080.0 10282.0 0 .0 .0 TOOL NUMBER 6.000 9839.0 BIOPOLYMER 9.10 80.0 11.0 30000 6.0 .000 .000 .000 .000 .0 .0 .0 .0 .00 .000 .0 0 DATA BELOW KICK-OFF POINT AT 10200' IS FROM THE WELL E-24A PB1. $ CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 t FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10285.000000 Tape File End Depth = 10010.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 14042 datums Tape Subfile: 4 72 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10149.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMIIMANGLE: MAXIMUM ANGLE: STOP DEPTH 10194.0 21-0CT-94 MWD 2.19 1.09 MEMORY 10244.0 10198.0 10244.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE A_ND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: BIOPOLYMER 9.10 119.0 11.3 26000 6.0 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 9. CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COLIN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10245.000000 Tape File End Depth = 10145.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3182 datums Tape Subfile: 5 66 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes rape Subfile 6 is typ~: LiS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10169.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10210.0 22-OCT-94 MWD 2.19 1.09 MEMORY 10259.0 10244.0 10259.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MI/D DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: BIOPOLYMER 9.20 112.0 11.7 30000 6.0 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 10. CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10260.000000 Tape File End Depth = 10165.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 TaPe Subfile: 6 14616 datums 66 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes rape Subfile 7 is typ~: Lis FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10210.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10357.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 11. 23-OCT-94 MWD 2.19 1.09 MEMORY 10407.0 10259.0 10407.0 0 .0 .0 TOOL NUMBER 6.000 9839.0 BIOPOLYMER 9.20 82.0 10.6 29250 4.8 .000 .000 .000 .000 .0 .0 .0 .0 .00 .000 .0 0 CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10410.000000 Tape File End Depth = 10205.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4416 datums Tape Subfile: 7 68 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes rape Subfile 8 is type: LiS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 12 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10346.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMIIMANGLE: STOP DEPTH 10699.0 24-OCT-94 MWD 2.19 1.09 MEMORY 10741.0 10407.0 10741.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NIIMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: BIOPOLYMER 9.20 83.0 10.8 29500 4.4 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 12. CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 10 Tape File Start Depth = 10745.000000 Tape File End Depth = 10345.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17020 datums Tape Subfile: 8 73 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ~ape Subfile 9 is type: Lis FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10691.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11161.0 26-OCT-94 MWD 2.19 1.09 MEMORY 11210.0 10741.0 11210.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NLTMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: B I OPOLYMER 9.25 92.0 8.6 30100 4.4 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 13. CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COLIN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 13 Tape File Start Depth = 11215.000000 Tape File End Depth = 10690.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7570 datums Tape Subfile: 9 76 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ·'ape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 14 DEPTH INCREMENT: .S000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11157.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11557.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 14. 27-OCT-94 MWD 2.19 1.09 MEMORY 11607.0 11210.0 11607.0 0 .0 .0 TOOL NUMBER 6.000 9839.0 BIOPOLYMER 9.20 105.0 8.9 32500 4.4 .000 .000 .000 .000 .0 .0 .0 .0 .00 .000 .0 0 CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE% 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name To°l Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 11 Tape File Start Depth = 11605.000000 Tape File End Depth = 11155.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19724 datums Tape Subfile: 10 74 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes rape Subfile 11 is t~pe: LIS FILE HEADER FILE NUMBER: 10 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 15 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11534.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11670.0 29-OCT-94 MWD 2.19 1.09 MEMORY 11719.0 11607.0 11719.0 0 .0 .0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL G~ PROBE $ TOOL NUMBER BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 9839.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASI/RED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: B I OPOLYMER 9.20 76.0 9.0 32750 4.4 .000 .000 .000 .000 .0 .0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 15. CN : BP EXPLORATION WN : E-24A PB2 FN : PRUDHOE BAY COLIN : NORTH SLOPE STAT : ALAStfA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 11720.000000 Tape File End Depth = 11530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8714 datums Tape Subfile: 11 68 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes · ape Subfile 12 is type: LIS 96/ 1/20 01 **** REEL TRAILER **** 96/ 1/22 01 Tape Subfile: 12 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 22 JAN 96 l:40p Elapsed execution time = 1.87 seconds. SYSTEM RETURN CODE = 0