Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout194-122oN oR BEFORE
C:LO~VIF~LN~DOC
PLUGGI_N= & LOCATION CLE~-~,NCE R~.PORT
State of Alaska
.ALASK~ 0iL & GAS CONSERVATION COM/~ISSION
Well ."fame
Review the well file, az~.d' c.'-~.e~= on plugging, well head
. o
*--- STATE OF ALASKA
ALASKA ...,L AND GAS CONSERVATION COMM';,.,SION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Plugged Back for Sidetrack
i. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 194-122 300-156
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21769-01
4. Location of well at surface ''t.f,,]r-,~lK;71~tl~ I 9. Unit or Lease Name
1786' SNL, 501' WEL, SEC. 06, T11 N, R14E, UM,.,, . , Prudhoe Bay Unit
At top of productive interval
683' SNL, 1623' WEL, SEC. 07, T11N, R14E, UM
At total depth i' 10. Well Number E-24A
2648' SNL, 1430' WEL, SEC. 07, T11N, R14E, UM
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 65.33' ADL 028304
12. Date Spudded10/11/94 ! 13' Date T'D' Reached 114' Date C°mp'' susp'' °r Aband'l 1/11/94 6/26/2000 115' water depth' if °ffsh°reN/A MSL 116' N°' °f C°mpleti°nsZero
17' T°tal Depth (MD+TVD)118' Plug Back Depth (MD+TVD)12240 8930 FT 12166 8929 FTI, 119' Directi°nal Survey I 20'[] Yes [] No Depth where SSSV set. 21. Thickness of PermafrostN/A MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
GR
.2.3. CASING, LINER AND CEMENTING RECORD
CASING SE-I-FING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
,.
20" Insulated Conductor Surface 110' 8 cu yds Concrete
13-3/8" 72# L-80 / S-95 38' 2675' 17-1/2" 1863 cuft PF 'E', 1860 cu ft PF
9-5/8" 47# L-80 35' 9816' 12-1/4" 2078 cuft Class 'G'
7" 26# IJ4S 9568' 9839' 8-1/2" 400 cuft Class 'G'
5" 15# 13Cr80 9400' 12240' 6" 276 cuft Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number)
SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 9405' 9345'
MD
........... MD TVD
i'*:~.~'"'-"'~';~'~7,!'~? ~;',~?~ ..... ~ " 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
^! !'" 0 '*"',¢-':-~. 10320' Set Whipstock
10320' P&A with 36 bbls Class 'G', Sqzd to 1000 ps~
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
ORIGINAL
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
Subsea
Shublik 9866' 8340'
Top of Sadlerochit 9955' 8400'
Zone 3 10153' 8539'
31. List of Attachments: Summary of Daily Drilling Reports
32. I hereby certify that the foreg.oing is true and correct to the best of my knowledge
Signed TerrieHubble ,,~[/~ ~ Title TechnicalAssistant Date(~-~",-(~
E-24A 194-122 300-156
Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5; Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'. i ', i ~ i '
Form 10-407 Rev. 07-01-80
Well: E-24B Accept: 07/01/00
Field: Prudhoe Bay Spud: 07/08/00
APl: 50-029-21769-02 Release: 07/11/00
Permit: 200-091 CTD Unit: Nordic #1
PRE-RIG WORK
06/25/00
RU SWS 2145. Lay lubricator on ground and orientate whipstock. Orientation complete, finalize
whipstock assembly and stab onto well and PT. RIH. PUH through GLM #1 while logging for tie in to
GR/CCL dated 11/24/94. RIH, passing through tight spot in tubing tail (9390'-9409') without problems.
PUH and log 3 collars below and above 10,307' to verify on depth (CCL to top of whipstock is 13'). RIH to
10,380' and attempt to set whipstock. Unable to set whipstock, out of desired orientation window.
Continue to make attempts to set whipstock by varying speeds while RIH and PUH. Closest orientation is
roughly 55 degrees left of the high side one joint above (10,270' to 10,312') desired whipstock set point of
10,320' (top of joint located at 10,312'). Call Well Operations Team Leader to discuss next plan of attack.
Receive approval from Anchorage Drilling Engineer to set whipstock at 55 degrees left of the high side in
the joint from (10,270' to 10,312') rather than risk getting stuck in the damaged tubing tail. PUH to 10,267'
- top of whipstock is at 10,280', RA tag is at 10,288.9'. Whipstock is oriented 44 degrees left of highside.
Unable to set whipstock - short in the tool string. SWS to attempt switching modules in the logging unit
prior to attempting to POH and through the TT. New module produces similar results, unable to set
whipstock. POH. Able to pass through tight spot at TT from 9390' to 9409' with no problems. At surface -
lay down lubricator and examine tool string. Found that some portions of the tool string were flooded. Call
to SWS shop for replacement parts.
O6~26~OO
MIRU DS CTU #2. Pressure test surface equipment. Perform full BOP test. RIH while loading hole with
seawater. Well took fluid with little or no pressure. No problems passing through tailpipe. Tagged
whipstock at 10,317' ctmd, corrected to 10,320' elmd. Whipstock in place. With choke closed,
pumped 5 bbls straight cement followed by 25 bbls cement with aggregate followed by 6 bbls straight
cement. At 25 bbls away (cement covering perfs) noted first sign of pressure build up. Continued
pumping cement with choke closed until 34 bbls cement out nozzle, WHP - 200 psig. Open choke and
maintain 200 psig until remaining cement out nozzle, PUH to safe. Shut down, hesitate 30 min. Bump
pressure up to 600 psig. Hesitate 30 min. Bump pressure up to 1000 psig. Hesitate 15 min. Bump
pressure back up to 1000 psig - good squeeze. Bleed pressure back to 200 psig. RIH contaminating
with Biozan. Found stringer/bridge at 9818'. Worked down to 9848' encountering harder cement.
Elected to abort further attempt to contaminate deeper. POH.
Based on hard cement depth, approx. 9 bbls. cement (470') remains on top of whipstock, leaving 25
bbls below whipstock covering perfs and approx. 2 bbls into perfs.
O6~26~OO
Tool string re-made, tested, and re-oriented. Stab on to well, PT, and RIH. PUH through GLM #1 while
logging for tie in to GR/CCL dated 11/24/94. RIH, passing through tight spot in tubing tail (9390'-9409')
without problems. PUH and log collars to verify on depth with GR/CCL dated 11/24/94. Locate CCL at
10,307' - top of whipstock at 10,320'. Orientation is zero degrees (high side) looking downhole. Set
whipstock at 10,320', orientation is zero degrees from high side - RA tag is located at 10,328.9'. PUH
and RIH to tag whipstock - verify whipstock is set at 10,320'. POH. Pull through TT with no difficulties -
continue to POH. At surface RD SWS 2145. Notify PC and Pad Operator whipstock has been set and
well is SI. Well is freeze protected with 33 bbls MEOH (6/23/00)
BP AMOCO
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
E-24
E-24
DRILL+COMPLETE
DOWELL SCHLUMBERGER
NORDIC 1
Start:
Rig Release:
Rig Number:
6/28/2000
Page 1 of 6
Spud Date: 7/1/2000
End:
Group: COIL
Date
7/1/2000
7/2/2000
From - To
06:00 - 07:00
07:00 - 09:00
09:00 - 13:00
13:00- 15:00
15:00 - 16:00
16:00 - 16:30
16:30 - 17:15
17:15- 17:45
17:45 - 20:15
20:15 - 21:00
21:00 - 22:00
22:00 - 00:00
100:00 - 02:00
02:00 - 04:00
04:00 - 05:00
!05:00 - 08:30
i08:30 - 09:00
1.00! MOB PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
~PROD1
PROD1
:PROD1
~PROD1
i PROD1
i PROD1
PROD1
PROD1
PROD1
PROD1
2.00 MOB
4.00 RIGU
2.0( RIGU
1.00 RIGU
0.50 RIGU
0.75 RIGU
0.50 STWHIP
2.50 STWHIP
0.75 STWHIP
1.00 STWHIP~
·
2.00 STWHIP
2.001STWHIP
2.001S'BNHIP
1.00! STWHIP:
3.50i STWHIP'
0.50 ~ STWHIP
0.25 ~ STWHIPi
09:00 - 09:15
i 09:15- 11:00
11:00 - 11:30
1.75
0.50
1.75
0.25
0.2~
1.0(
2.25
0.75
0.75
2.50
S TWHIP:
STWHIP,
S'I'WHIP
STWHIP
DRILL
DRILL
DRILL
DRILL
DRILL
DRILL
~11:30- 13:15
113:15 - 13:30
113:30 - 13:45
113:45 - 14:45
!14:45 - 17:00
i 17:00 - 17:45
17:45- 18:30
18:30 - 21:00
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
:PROD1
PROD1
FILL .PROD1
:21:00 - 23:00
i23:00 - 23:30
!23:30 - 00:00
2.00~ DRILL
0.50~ DRILL
0.50~ DRILL
FILL
FILL
FILL
PROD1
: PROD1
PROD1
Description of Operations
Accept rig on E-24b at 06:00 hrs on 07/01/2000.
Scope up derrick.
Set up cuttings tank and rig up for BOP test.
Test BOPE to 250~4000 psi. Witnessing of test waived by J. Spaulding -
AOGCC inspector.
Open swab and master valves. Slight blow but well is dead.
Re-build packoff in injector head.
Stab coil into injector.
MU coil connector
Fill coil with seawater and pump dart.
Coil vol from dart = 59.0 bbl
MU window milling BHA #1 with 3.8" HC diamond window mill, short
string mill and HP motor.
RIH with BHA #1.
;Tag XN Nipple at 9391' CTD, correct to 9397 ft BKB. Mill XN nipple.
'r Mill out end of 4 1/2" tailpipe, Caliper and drift runs during well prep
proved end of tailpipe was undergauge. Mill from 9405 - 9410 ft. Back
~: ream to 9390 - 9410 ft.
~RIH with mill to top of cement at 9854 ft. Mill cement at 120 FPH with
i HC window mill and seawater. Mill cement from 9854 - 10004 ft.
i Mill cement from 10004 - 10210 ft. 2.7 BPM, 2050 psi, 120 FPH.
'.Circ. 30 bbl sweeps of used FIoPro every 50 ft.
i Mill cement from 10210 - 10300 ft. Circ. FIoPro sweeps as necessary.
i Mill cement to top of whipstock. 1780 psi, 2.7 BPM, 16K D. Wt.
~ Mill window starting at 10320 ft. Flag CT at 10320 ft.
! Milled to 10325.9' and mill appeared to complete window - increased
i motor work.
i Continue milling in open hole and start dressing window with string mill
i to 10327'.
i Pick up and check weights. Run in and see increased motor work at
i 10325.5'.
: Increase WOB and mill into formation. Stall & PU. Tag up and mill open
hole -several stalls at window but finally smoothed out. Mill open hole to
10336'. Pump FIo-Pro sweep around. Window 10320-10326'. Open hole
10326-10336'.
Work milling assembly across window to verify clean. Make 2 dry
passes thru - looks good. No weight or pressure changes.
POH. No problems coming back thru tailpipe.
Stand back injector. LD milling 13HA.
PJSM prior to PU drilling BHA.
MU Drilling BHA #2 w/STC M09BQPX. MU coil conn& stab injector.
RIH. Correct to flag at 10234.3' EOP - 10299.3' bit depth.
Orient around to go thru window - couldn't get thru on first attempt. Get
clicks but weak tool signal - possibly aerated mud.
Repair hydraulic hose on reel motor (15 min).
Continue trying to work thru window getting clicks without TF readings.
Orient TF. Getting MWD pulses. Unable to get thru window at 25R.
'Orient around. Unable to get thru window at 20L, 10R, 30R, 50R and
90R.
POOH with MWD BHA. Unable to get out window.
i Lay out MWD BHA. Bit heavily chipped/worn on shoulder.
M/U window milling BHA with 3.80" diamond mill and 3.80" string
: reamer.
Printed: 8110/2000 2:07:42 PM
BP AMOCO .... _.. ,,, ::, ,,.,.,,. Page 2 of 6
"; i /' 'i , '.".~. '.:',-:
Operations Summary Report ,..;,::,:... ?:¢;
'¢;;.'~;... , ::' ...;; ..-. ..
' ",: .:'h "~: '- ~
Legal Well Name: E-24
Common Well Name: E-24
Event Name: DRILL+COMPLETE
Contractor Name: DOWELL SCHLUMBERGER
Rig Name: NORDIC 1
Date ! From-To Hours,Activity Co~ Phase
7~3~2000 00:00 - 01:30 1.50 STWHIP; FILL PROD1
01:30 ~ 03:00 1.50: STWHIP, PROD1
03:00 - 05:00
05:00 ~ 06:30
06:30 - 08:15
08:15 ~ 08:30
08:30 ~ 08:45
08:45 ~ 09:30
09:30 ~ 11:15
11:15- 11:30
11:30 ~ 11:45
11:45 - 12:15
12:15- 14:00
14:00- 14:15
14:15- 16:30
16:30- 16:45
16:45 - 18:00
7/4/2000
18:00- 18:15
18:15- 19:00
19:00 - 20:40
;20:40 - 21:00
;21:00 - 22:30
22:30 - 23:10
23:10 - 00:00
00:00 - 00:30
;00:30 - 01:00
01:00 - 03:15
03:15 - 03:45
03:45 - 04:30
04:30 - 06:00
06:00 - 07:30
07:30 - 08:00
08:00- 10:15
2.001STWHIP;
1.75~ S-I'WHIP
0.25; STWHIP;
0.25 STWHIP!
0.75 STWHIP i
1.75 STWHIPi
0.25 STWHIP
0.25 STWHIP
0.50 DRILL
1.75 DRILL
0.25 DRILL
2.25 DRILL
0.25 DRILL
1.25 DRILL
0.25 DRILL
0.75 DRILL
1.67 DRILL
0.33~ DRILL
1.50i DRILL
0.671 DRILL
0.83 DRILL
0.50 S'TWHIP i
0.50 STWHIP!
2.251STWHIP !
0.50 STWHIP i
0.75~ STWHIP
1.50 !
STWHIP
1.50 STWHIP:
0.50 ~ STWHIP i
2.25 ~ STWHIP
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
FILL
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
, PROD1
;PROD1
i PROD1
~PROD1
i PROD1
PROD1
PROD1
i PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
. PROD1
PROD1
10:15- 11:15
11'15- 13:30
1.00 STWHIP
2.25' STWHIP
~ PROD1
· PROD1
13:30- 14:00
14:00- 15:00
15:00 - 16:30
0.50: S TWHIP~
.
1.00 STWHIP
1.50' S'I'WHIP::
PROD1
~PROD1
: PROD1
Start:
Rig Release:
Rig Number:
6/28/2000
Spud Date: 7/1/2000
End'
Group: COIL
Description of Operations
RIH with miilling / reaming BHA.
'Tag fill above whipstock, cleanout fill. Correct depth to flag at 10,320 ft.
First motor work 12 ft above top of whipstock. Mill to TD of 10,338 ft. [2
ft of new formation]. Backream to 10310'
Ream up and down from 10320-10334 ft, four times. Slight motor work.
RIH to TD with no pump. Hole OK.
Ream window area, RIH with no pump, clean to TD. POOH clean.
Ream down slow, clean window in and out. Flag CT at 10,200
POOH with milling BHA. Stand back injector.
LD motor and mills.
PJSM prior to MU drilling BHA.
. MU drilling BHA #4 w/Smith M09BQPX rebuild
RIH with BHA #4. Shallow test MWD - OK.
Orient above previous TOC for highside to go thru window.
RIH. Correct to flag at 10265' o (-19.8'). Cont RIH and go thru window -
"slight pump press incr at top of window. Tag btm at 10338'.
~Orient below window for left turn.
Drill ahead to 10340'. Get 2 clicks. Drill to 10350 - 118L. Get 1 click.
! Drill to 10415' - 2.6/2.6 bpm. 3510 psi. 90-50L.
'Orient around for 70-80L.
: Drill ahead to 10425'. Get 1 click. Drill. Get 1 click. Drill to 10455'. with 3
i clicks - TF keeps wanting to roll left and trying to hold 60-70L. Get 1
iclick & drill to 10500'. Pump up survey - bad G total.
"Short trip to window and back to bottom.
Drill ahead - 2.6/2.6 bpm. 3230 psi. 62L Drilling slow and getting slower
- bit may be balled or crippled from chert/pyrite. Try to unball - no
Success.
POH. Flag pipe at 10365'. Pull up to 10315'.
Log GR at 10279 ft. Add 1.5 ft to CTD. Flag CT at 10200' EOP.
POOH for new bit.
Change out bit.
RIH with Bit #3, correct CTD at flag, [-17 ft]. Read TF of 160R
Orient TF to 50L RIH thru window with no problem.
Drilling, TF=62L, 2.5 BPM, 2900 psi, ROP = 40 FPH
Drilling, TF=45L, ROP = 150 FPH, 2.6 BPM, 2900 psi.
Orient around,
Drilling, TF=73L, ROP = 140 FPH, 2.6 BPM, 2900 psi.
Short trip to window.
Drilling, TF= 60L, ROP = 110 FPH. 2.6 BPM, 3000 psi.
Drilling, TF=40L, Balled bit, work CT to clear bit. Spud and clear bit.
Drilling, TF=17L, ROP=100 FPH, 2.6 BPM, 3250 psi. Get I click at
10790' to 5L. Drill to 10810'.
Cont drilling for build to land well. Having some weight transfer
problems. 2.712.7 bpm. 3050 psi. 5R.
:Well landed at 8867' TVDss (10819' MD) with est 91 deg inc on bottom.
POH for bit & motor change. Flag pipe at 10565' - (10500' EOP).
Tie in to RA tag. Corr'n (+3'). Stand back injector.
Change bit and motor to 1.1 deg. Change out MWD. MU injector.
RIH with BHA #6 & bit #4 - HYC DS49H+GJNU. Stop at flag and
correct depth to 10568' - (Corr'n: -19.3'). RIH and tag bottom at 10820'.
Orient around for 90L
~ Drilling horizontal hole in Zone 1 sand / shales.
!Drilling, TF=89L, 80 FPH, 2.7 BPM, 3200 psi, Stacking wt.
Printed: 8/1012000 2:07:42 PM
~--. STATE OF ALASKA ~--
ALASK. .)ILAND GAS CONSERVATION COb, ', 3SION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska) Inc.
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
3. Address
P.O. Box 196612, Anchorage, Alaska
99519-6612
4. Location of well at surface ,/ .,/" ,./
1786' SNL, 501' WEL, SEC. 0t~,T11 N, R14E, UM
At top of productive interval
683' SNL, 1623' WEL, SEC. 07, T11N, R14E, UM
At effective depth
2575' SNL, 1443' WEL, WEC. 07, T11N, R14E, UM
At total depth
2648' SNL, 1430' WEL, SEC. 07, T11N, R14E, UM
6. Datum Elevation (DF or KB)
KBE = 65.33'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
E-24A
9. Permit Number
194-122 ,/
10. APl Number
50- 029-21769-01 'v/'
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
12240 feet`,/`
8930 feet ~/
Plugs (measured) Baker IBP set at 11782' (04/95)
12166 feet Junk (measured)
8929 feet
Length Size Cemented
110' 20" 8 cu yds concrete
2637' 13-3/8" 1863 cu ft PF 'E', 1860 cuft PF
9805' 9-5/8" 2078 cu ft Class 'G'
271' 7" 400 cu ft Class 'G'
2840' 5" 240 sx Class 'G'
ORIGINAL
MD
110'
2675'
9816'
9568' - 9839'
9400' - 12240'
TVD
110'
2675'
8367'
8174' - 8385'
8044' - 8930'
Perforation depth: measured
10950'-11054', 11244'-11275', 11376'-11656', 11820'-12150'
true vertical 8932'-8932', 8929'-8928', 8926'-8919', 8921'-8928'
Tubing (size, grade, and measured depth)
4-1/2", 12.6#, L-80 to 9405'
Packers and SSSV (type and measured depth) TIW 'HBBP' packer at 9345'; Otis SSSV Landing Nipple at 2190'
13. Attachments
[] Description Summary of Proposal
4. Estimated date for commencing operation
June 14, 2000
16. If pcr,,o/g~osal was verbally approved
Name of approver r'
i .~"¢C,~ J 15.
I
Date Approved
Contact Engineer Name/Numbec Ted Stagg, 564-4694
[] Detailed Operations Program [] BOP Sketch
Status of well classifications as:
[]Oil [] Gas []Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby certify that the foEego, Lpg is_true and correct to the best of my knowledge
Signed Ted Stagg .~--~//~~ Title CT Drilling Engineer
Conditions of Approval: Notify Commission so representative may witness
Plug integrity '~ BOP Test "~ Location clearance
Mechanical Integrity Test__ Subsequent form required 10-
ORIGINAL SIGNED BY
Approved by order of the Commission [~ Ta¥1,0r SeafT!gUnt
Form 10-403 Rev. 06/15/88
J Approval No. ~0 -- ~:5(g
Returned Submit ~n Trip'cate
hared
_, ervices
rilling
Date: June 12, 2000
To:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention:
Blair Wondzell
Sr. Petroleum Engineer
Re:
Well E-24A Prep for CT Sidetrack
Well E-24a is scheduled for a through tubing sidetrack to be drilled with
coiled tubing. The following summarizes the procedure required to prepare E-
24a for sidetracking and is submitted as an attachment to Form 10-403. A
schematic diagram of this proposed completion is attached.
1. A Tubing Integrity Test, whipstock drift and Kinley caliper log are
scheduled to be done.
2. E-Line will set a mechanical whipstock at 10340' MD.
$. Service coil will squeeze approx. 20 bbls cement past the whipstock to
shut off existing perfs.
4. Service coil will then be used to mill the window. Service coil BOPE will
be pressure/function tested with AOGCC witness prior to milling.
Step 3 is scheduled for approx. June 14, and step 4 is scheduled for June 15,
2000, pending AOGCC approval.
Ted Stagg J"~ ~/-xd~,,o
Senior CT Drilling Engineer
cc: Well File
Petrotechnical Data Center
TREE: 4-1/16" FMC W/7'q'REE CAP
WELLHEAD: McEVOY
ACTUATOR: AXELSON
Cemented
13 3/8" 72#
L-80 BTRS 12,6751
4-1/2" 12.6# L-80 MOD BTRS
TUBING ID: 3.958"
CAPACITY: 0.01522 BBL/FT
KOP: 2800'
MAX ANGLE: HORIZONTAL
9-5/8" Tie-Back Sleeve
(T~W) I 9,400
7" Liner Top I 9,5681
9 5/8" 47# L-80
BTRS/NSCC
I 9,816 1 ~
E-24b Proposed Completion
KB. ELEV = 67.48'
BF. ELEV = 31.78'
SSSV LANDING NIPPLE
I
I
2,
1
9O
(OTIS) (3.813" ID) I I
GAS LIFT MANDRELS
Merla TGPD W/1.5" RK LATCHES
N° MD(BKB) TVDss Dev
3 4,323 4,137 37°
2 7,703 6,726 41 o
I 9,180 7,806 39°
X-NIPPLE
(OTIS) (3.813" ID) I 9,3281
9-5/8" PACKER
(TIW "HBBP") (4.00"lB)
I 9,3451
4-1/2", 12.6/f/ft, L-80 TAILPIPE
4-1/2" X-NIPPLE
(OTIS) (3.813" ID)
19,3761
4-1/2 .... XN" NIPPLE
(OTIS) (3.725" ID)
I 9,3931
.4-1/2" WLEG 9,405
(ELMD) 9,409
E-24b whipstock to be set
approx. 10,340'. 2 7/8" liner to
be cemented to 200' above
the window. Existing perfs to
be downsqueezed w/cement.
PERFORATION SUMMARY
REF. LOG: GR/CCL 11/24/94
Size ISPF I Interval IOpen/Sqzed
3_3/8,,I 4 110,950-11,054 IOpen
3-3/8" I 6 1~1,244- 11,275 IOpen
3-3/8"I 4 111,376-11,656 IOpen
IBP set @ 11,782
3-3/8"
4 I 11,820- 12,150 [Open
I 98391 T°p°f7' Window
~=~- ~
Baker IBP Fishing
Neck, set 4/2/95
1,772
PBTD 12,166
5",15/f,13CR,STLShoe 12,240
HORIZONTAL WELL BORE
13 CR LINER
STATE OF ALASKA
ALA~<A OIL AND GAS CONSERVATION COMMIS,
REPORT ;_ SUNDRY WELL OPI- ATIONS
1. Operations performed: Operation shutdown m Stimulate~ Pluggingm
Pull tubing Alter casing m Repair well
Perforatex
Other__
2. Name of Operator
BP Ex/~loration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorac~e, Alaska 99519-6612
4. Location of well at surface
1786'SNL, 501' WEL, SEC. 6. T11N, R14E
At top of productive interval
1086' SNL. 1646' WEL, SEC. 7, T11N, R14E
At effective depth
2575' SNL, 1444' WEL, SEC. 7, T11N, R14E
At total depth
2646' SNL, 1408' WEL, SEC. 7, T11N, R14E
5. Type of Well:
Development
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KB = ~7,4~'
7. Unit or Property name
Prudhoe Bay Unit
feet
8. Well number
E-24A (32- 7-11-14 )
9. Permit number/approval number
94-122 /
10. APl number
50-029-21769-01
11. Field/Pool
Prudhoe Off Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Structural ..
Conductor 110'
Surface 2199'
Intermediate 2637'
Production --
Liner 6560'
Perforation depth:
12240'
8930'
12166'
8928'
Size
feet Plugs (measured)
feet
feet Junk (measured)
feet
Cemented
Measured depth
146
2235
2673
20"
13-3/8"
13-3/8"
8 cuvds Concrete
1963 cuft PF "E"/1860
5" 240 sx Class "G" 9400-12240
measured 10950;11054', 11376;11376;11656', 11820;12150'
true vertica~ubsea 8933'-8932', 8926'-8919', 8921'-8928'
Tubing (size, grade, and measured depthS-1/2", L-80 to 9405'
Packers and SSSV (type and measured depthPacker @ 9345'
SSSV @ 2190'
True vertical depth
BKB
146
2206
2644
8015~8900
ORIGINAL
13. Stimulation or cement squeeze summar~ee Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure
S/I
732
Tubing Pressure
12524 21 83 95
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Report of Well Operates__ Oilx Gas Suspended
17. I hereby certify that,the fo~(oing is true aod~rrect to the best of my knowledge.
Signed _ Title Technical Assistant III
Form 10-404 F~'ev 06/15/88 ~
Service
Date
SUBMIT IN DUPLICATE
E-24A
DESCRIPTION OF WORK COMPLETED
ADD PERFS
11/30/96
SUMMARY
The following additional interval were perforated using 3 3/8" guns, 6 SPF,
random orientation and 60° phasing.
11244' - 11275' MD
t t~ ..~
is. E IR iq ~ T D/.',, T A T ~ ,,.~ T A._F' L I I S
91.~..- /22 '?0'10 ~.'iWD SPERR;¢' S FI,~ EVAL
'"~/ki W D SPERRY
9~,'" i 22 70 i 2 ~i~dV'ID SPERRY S Fl'~ EVAI_,
'~ ~. 2 ',.? D
9 Z~ .-- I 22 'S R / (:; C L ~9 I 00 '" I 0658 i
9h-"' i22 F'DK ~'10600"' i2130
9~+ ..... i22 F'DLS/STAT PRESS ~:10~00 ..... 1063i 1
9h."'122 F'ROD PRFZLE ~00""I i i75 i
9~'--i22 S(SRC/SROP B~D ~ 9780 10632 ST~ 1&.2 i ' 16
9 h --- i 22. S ':'::~ R C ,/S R 0 P kl D ~ 9839 "- 'l 2239 'i '/" 2 ',;
9h'-"i22 SGRC/SROP TVD ~3386 897B ST ~J18~2 '1""16
9h-""122 S'qRC/SROP TVD ~9839'-'8933 i7" 2
S F I~ E VA L
oBpJoqouv
ul~lgs~uguoo 'suoo seD 'g !{0 e){sepV
66[
C08L-e9S (L06) og X~& aO
I0g o~TnS
~aa~S 8 009~
sooT~oS ~u~Ia~M s~I~
uosIn~6 'G A~upoH 'u$~ :o~ u~n~a pu~ uBTs ss~I6
I0'60E9
S0'g98S
'ON
I # un~I
I # un}{
I # un~I
SI~ + ~A DMG~ I
SI~ + ~6~A DMG~ I
SI~ + H6~ DMG~ I
NOI~6IHDS~G #
:~oloq poq~.~ssap s~ ~g~p og~ pu~.~ os~oId 'pasolDu.g
'urep~14/~. S
%Ik54 :Aq ~uas
w~wG go I~ymsu~xz
~66I X~naqal I
: HH
'I0~66
HD~gHOHDN-~
HAIHG ~HI~DHO6 I00T
NOIZ~AHHSNOD S~D + ~IO %DISkrl~ 'U$$~
~Nkn6D XHH~
RECEIVED
JAN 2 ;' 1995
Alaska 011 & Gas Cons. Commiss|OIl'
Anchorage
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 18 January 1995
RE: Transmittal of Data
Sent by: MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
E-S
F-OS
DESCRIPTION
1 PFC/CCL FINAL BL+RF
1 PDK FINAL BL + RF
1 PFC/PERF FINAL BL+RF
1 PDK FINAL BL+RF
ECC No.
Run ~ 1 1291.06
Run # 1 1311.01
Run # 1 4050.02
Run # 1 6309.01
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by: Date:
0 FI I I__1--1N [:S
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - E-24A
AK-MW-40082
January 4, 1995
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this of this transmittal letter to the attention of:
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, gG, Anchorage, AK 99518
2" x 5" MD Resistivity and Gamma Ray Logs:
50-029-21769-0
1 Blueline
1 Folded Sepia
2" x 5" TVD Resistivity and Gamma Ray Logs:
50-029-21769-01
2" x 5" MD Resistivity and Gamma Ray Logs:
Sidetrack gl and Sidetrack g2
50-029-21769-71
2" x 5" TVD Resistivity and Gamma Ray Logs:
Sidetrack gl and Sidetrack g2
50-029-21769-71
1 Blueline
1 Folde~-~;la
1 Blueline
1 Folded Sel~.
1 Blueline
1 Folded Sepia
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classilication of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] ,
2. Name of Operator 71 Permit Number
3. Address 8. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21769-01
4. Location of well at sudace 9. Unit or Lease Name
1786' SNL, 501' WEL, SEC. 6, T11N, R14E ..... ' ............... ~ ~~t;~Pru.clhqe ,Bay Unit
At Total Depth i-~~::;~,,; ... ~!Pruclhoo Bay Field/Prudhoo Bay Pool
i5. Elevation in feet {indicate KB, DF, etc.) I~. Lease Designalion and Serial No.
KB~ ~ 65.33' ! ADI. 28304
12. Date Spudded 13.'Daie I.D. Reached 14. Date Comp., Susp. or Aband.' 115. Water Depth, il oflshore 116. No. of Completions
10/11/94 11/11/94 11/18/94I N/A feet MSL I One
lY. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)'19. Directional Survey 120. Depth where sSsv set 121. Thickness of Permafrost
12240'MD/8930' TVD 12166'MD/8928' TVD YES [] NO []I 2190'feet MD'1 1.900'(Approx.)
22. Type Electric or Other Logs Run
GR
23. CASING, LINER AND CEMENTING RECORD
SE'FI'lNG DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMEN'flNG RECORD AMOUNT PULLED
20" Conductor Surface 110' 8 cu,yds Concrete
13-3/8" 72# L-80 Surface ' '2235' 17-1/2"
13-3/8" 72# S-95 2235' 2673' 17-1/2" 1863 cu ft PF"E"/1860 'cu PFI '
9-5/8' 47# L-80 Surface 9839' 9-5/8" 2078 cuft Class "G"
5" 15# 13CR80 9400' 12240' 6" 240 sx Class "G"
24. Perforations open to Production (MD+TVD of Top and Bolt~m and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD/ PACKER SE.T (MD/
Gun Diarneter 3-3/8" ~_¢pDf 4-1/2", L-80 9405' 9345'
MD .. -
10950'-11054' 8933'-8932'
11376'-11656' 8926'-8919' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
....
11820'-12150' 8921 '-8928' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production JMethod of bperation (Flowing, ~as lili, ~tc'.)
1 1/29/94 I Flowing7
Date °' Test H°urs Tested TEST PRODUCTION FOR OIL-BBL PERIOD IGAS'MOF WATER'BBL CROKESIZE IGAS'OIL RATIO
Flow Tubing Casing Pressure 3ALCULATED OIL-BBL IGAS-MCF WATER-BBL ::3IL GRAVITY-APl (corr)
Press. 24--HOUR RATEI .
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence el oil, gas or water. Submit core chips.
RECEIVED
DEC 2 ?_ 1994-
A,~r~ska Oil & Gas Cons. Commissior,
Anchor~"
Submit in duplicate
Form 10-407
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30. ]
GEOL~ MARKERS FORMATION TESTS
NAME Include inlerval tested, pressure data, all fluids recovered and gravily,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
' ' Subsea
Shublik 9866' 8340'
Top Sadlerochit 9955' 8400'
Zone 3 10153' 8539'
RECEIVED
2 2 199q.
31. LIST OF A'FI'ACHMENTS Anch0r~. -,
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: E-24A
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 10/04/94 03:00
SPUD:
RELEASE:
OPERATION:
DRLG RIG: DOYON 14
WO/C RIG: DOYON 14
10/05/94 ( 1)
TD:10735
PB:10692
10/06/94 (2)
TD:10735
PB:10692
10/07/94 (3)
TD:10735
PB:10692
10/08/94 (4)
TD:10735
PB:10692
PULL TBG T/FLOOR
MW: 8.5 Seawater
MIRU. ACCEPT RIG @15:00 HRS. ON 10/4. TAKE ON SEAWATER,
SPOT SLOP TANK & CIRC. LINES T/WELL HEAD. RU FIELD SERVICE
LUBRICATOR & PULL BPV F/TREE. PUMP DOWN ANNUL & RECOVER
DIESEL F/TBG. CHANGE LINES, PUMP DOWN TBG & RECOVER DIESEL
F/ANNUL. CON'T. T/CIRC. FULL CIRC. RD LINES & SET 2 WAY
CHK. ND 6" TREE & ADPTR FLNG. CLEAN CMT & IRON F/FLOW LINE.
NU BOP'S. TEST BOP'S & MANIFOLD T/5000. LEAKING PAST TBG
HNGR. CONDUCT RUNNING FLANGE TEST T/5000. PULL TBG T/RIG ·
FLOOR, STRING WT W/BLOCKS 130,000#. PULL T/150000# T/BREAK
FREE @ CHEMICAL CUT @9319. & CIRC RU OTIS WL T/PULL CONTROL
LINE.
RIH PU 5" DP OFF RACK
MW: 8.5 Seawater
CIRC WHILE RIG UP T/PULL TBG & CONTROL LINE. LD HNGR, 63
JTS./5.5" TBG; CL; SSSV; 170 JTS OF 4.5" TBG;+i CUT-OFF
PIECE; 3 GLM'S; 26 RUBBER CLAMPS; 5 SS TBG & GLM'S. NORM
TESTED WHILE LAYING DOWN. LD TBG EQUIP. RU & TEEST BOPE
250/5000# & INSTALL WEAR BUSHING. MU BHA & RIH PU 5" DP OFF
THE RACK.
RIH W/MILL & PRT MW: 8.5 Seawater
CONTINUE PICKING UP 5" DP OFF RACK. CIRC OVER FISH @ 9324.
LATCH ONTO SAME & ATTEMPT TO RELEASE 'K' ANCHOR. CBU (GAS
CUT @ BU). POH W/FISH. LD FISH-RECOVERED 1-GLM-SLIDING
SLEEVE-2 JTS-CUT OFF JT & PBR SHEARED. REDRESS OVERSHOT &
RIH W/6.5" SPIRAL GRAPPLE. WASH DOWN TAG FISH & RELEASE
SAME F/PACKER. CBU (NO GAS). POH W/FISH-SLICK STICK &
ANCHOR. MAKE UP MILLING TOOL & PRT & RIH.
RIH W/WINDOW MILLING ASSY MW: 8.5 Seawater
RIH W/PACKER MILL. TEST 9 5/8" CSG TO 3500 F/30 MINS. OK.
MILL PACKER @ 9523' CBU-GAS BUBBLE OFF BOTTOM - SHUT IN &
CIRC. OUT THRU CHOKE. HOLE TAKING 200 BPH FLUID-FILL PITS
& WATER TANK-2.TRUCKS HAULING & STAND BY WHILE
TRIPPING-LOSS SLOWED TO 100 BPH. POH W/PACKER. LD TRI
STATE TOOLS-PACKER & TAIL PIPE. MAKE UP SECTION MILL &
BHA-6 4 3/4" DC, S-29 3.5" HWDP. RIH W/SECTION MILL.
WELL : E-24A
OPERATION:
RIG : DOYON 14
PAGE: 2
10/09/94 (5)
TD:10735
PB:10692
10/10/94 ( 6)
TD:10735
PB:10692
10/11/94 ( 7)
TD: 9844' (9844)
10/12/94 (8)
TD: 9895' ( 51)
CBU AFTER CUTTING WINDOW MW: 9.1 Seawater
FINISH RIH W/SECTION MILL. CUT & SLIP DRLG LINE. RIH TO
TOP OF PERFS @ 10520' (WOULD NOT GO THRU PERFS). CIRC.
MIX & PUMP LCM PILL (90 BBL). PULL UP TO 8627'. MONITOR
FLUID LOSS (INITIAL RATE 30 BPH - FINAL. RATE NIL). RIH
TO 9833'. DISPLACE HOLE W/MILLING FLUID. MILLING WINDOW
IN 7" CSG. F/9839' TO 9889'.
REVERSE OUT CMT @ 7" LINER TOP MW: 9.1 Seawater
CIRC & PUMP SWEEP @ 7" WINDOW @ 9839' TO 9889' PUMP MILL
OUT OF 7" CSG TO TOP OF 7" CSG @ 9567' (DRAG). CIRC & PUMP
SWEEPS @ 7" LINER TOP @ 9567. POH W/6" SECTION MILL. (10%
WEAR ON BLADES) LAY DOWN TOOLS. PICK UP 47 JTS 2 7/8" DSS
TBG & RIH W/TBG & 5" DP. WASH & REAM THRU PERF F/10520' TO
10614' (SOLID). RECIPROCATE & CIRC @ 10600' (BATCH MIX
CMT). PUMP 5 BBL WATER & TEST LINES TO 3000# FOLLOWED W/15
BBL WATER & 58 BBLS CMT 17# W/RECOMMENDED ADDITIVES.
DISPLACE CMT W/153 BBL MUD. (CIP 0430). PULL 11 STANDS DP
TO TOP OF LINER @ 9567. SQUEEZE 5 BBL CMT @ 2500# BLEED 2
BBL BACK. REVERSE OUT 10 BBL CMT & CIRC. PIPE CLEAN.
DRILLING CMT T/9844
MW: 0.0 VIS: 0
REV. CIRC CLEAN PIPE OF CMT. POOH LD 105 JTS OF 5" DP. & 47
JTS. OF 2-7/8" TBG. WASH OUT BOPE & PULL WEAR BUSHING. PULL
9-5/8" PACKOFF *& INSTALL NEW PACKOFF. DIDN'T SEAT; DAMAGED
SEALS. REPLACED W/NEW PACKOFF & TEST T/5000. INSTALL WEAR
BUSHING. MU BHA & RIH. BREAK CIR. & TAG CMT @9573. AOGCC
REP- (NAME NOT PROVIDED IN REPORT WITNESSED TAG OF CMT.
DRLG CMT FT/9844 (FIRM).
ATTEMPT T/KO
MW: 0.0 VIS: 0
FINISH DRLG CMT T/9840. BEGIN K/O OUT OF WINDOW T/9895. BIT
BEGAN T/TORQUE & MOTOR STALLED. FORMATION MAY HAVE CHANGED
CLOSE T/BTTM OF WINDOW. POOH T/CHANGE BIT & RIH T/9849.
WASH & REAM F/9849 T/9891. STOPPED @ WINDOW BTTM. PU T/9859
& TIME DRILL IN AN ATTEMPT T/K/O OF THE LOW SIDE OF THE
HOLE @ 5'PH .... ALL INDICATIONS SHOW THE BIT @ TOP OF STUMP
OF BTTM OF WINDOW. ATTEMPTING T/DRILL BY BUT WILL PROBABLY
HAVE T/LAY A NEW KICK OFF PLUG.
R£C£1Vrr-D
~;E(: 2 ?.. i994
Gas Cons. Commission
Anchor~ '
WELL : E-24A
OPERATION:
RIG : DOYON 14
PAGE: 3
10/13/94 ( 9)
TD: 9639' ( 0)
10/14/94 (10)
TD: 9853' ( 214)
10/15/94 (11)
TD:10083' ( 230)
HOLD 2000PSI ON K/O PLUG MW: 0.0 VIS: 0
CONT. LO SIDE TIME DRLG F/9875 T/9893. COULDN'T GO FURTHER,
NO TRQ INCREASE & NO INCREASE IN DIFF'TIAL ON MOTOR. POOH
T/SET 2ND K/O PLUG. RIH W/3.5" M'SHOE. T/SET #2 PLUG. CBU
@ 12BPM & 1800PSI. BATCH MIX CMT. PUMP 5 BBLS H20. TEST
LINES.OK. PUMP ADDT'L 18.5 BBLS OF H20. 10 BBLS OF CMT &
FOLLOW W/2.5 BBLS H20. DISPLACE W/RIG PUMPS & BAL. PLUG.
ATTEMPT T/PULL OUT OF PLUG. PU WT PRIOR T/CMT=225K. BEGIN
T/POOH. NO GO. PU T/350K. WORK DN. NO GO. CAN GO DN BUT NOT
UP. WORK PIPE UP T/375K & BACK DN. BREAK CIRC DOWN W'
STRING & GAIN ADDT'L 5' THEN STUCK AGAIN. ABORT CMT JOB.
REV. OUT CMT. POOH T/LINER TOP @ 9567. CON'T REV. CBU THRU
ANNUL. PREVENTER WHILE MOVING STRING. SMALL AMT OF RETURNS
@ BU. WENT T/BTTM & KELLY UP. ROTATE @ 90-100 RPM. PUMP
SWEEP. ANNUL VOL. F/TOL T/SURF=4773 STKS. OBTAIN CMT
RETURNS @+/- 4800 STKS. CUTTINGS INCREASE F/4800T/5500
STKS. SHAKERS BLIND OFF. CBU A 2ND TIME. NO RETURNS ON BU.
HOLE CLEAN. BATCH MIX AGAIN. PUMP 23.5 BBL H20. 10 BBL CMT.
2.5 BBLS H20. SPOT BAL. PLUG. PU WT BEFORE CMT 225K. POOH. 1
STND. PULL 275K W/TOP SINGLE OUT @25'. WORK DN. POOH NO
PROB. PULL 3 STNDS. & ALL STNDS BREAK DRY. REV CBU @TOL 1.5
DP VOL. OPEN BAG & WORK PIPE. PU 225K SO 135K. PRESS UP ON
PLUG T/2000. 46 STKS T/2000PSI. HOLD 1 HR. NO LOSSES. WILL
WAIT 16 HRS BEFORE TAG PLUG.
TIME DRLG F/K/O
MW: 0.0 VIS: 0
HOLD 2000PSI ON K/O PLUG. CBU POOH LD 86 JTS. OF 5" DP.
CHANGOUT MOTOR. ADJUST T/l-l/2 DEGREE. MU BIT & ORIENT.
RIH. SLIP & CUT DL 59.5'. RIH T/TOL @9567 MD. KELLY UP.
BREAK CIRC. WASH DN T/9678 & TAG SOFT CMT. CALCULATE TOC
@9639. BEGIN DRILLOUT OF SOFT CMT T/9711 MD. TOW @9839.
DIDN'T SEE BHA ENTER LINER TOP. CBU - SOFT CMT RETURNS ON
BU. WAIT ON CMT. HELD SFTY MTG. TAG CMT @9711 & BEGIN
T/DRILL. CMT FIRM. DRILLING 80-100 FPH. LAST 10' OF CMT WAS
HARD. DRILL +/- 25 FPH W/20K. DRLG DN T/ 5' BELOW WINDOW @
9844MD. TIME DRLG @5FPH FOR K/O.
RIH W/BHA #4 (ROTARY ASS'Y) MW: 0.0 VIS: 0
CONTINUE TIME DRLG TO KICKOFF PLUG F/9853' MD TO 9889' MD
AST 9.0. DIR DRLG F/9889' MD TO 10019' MD. AST 3.0 ART
1.5. DIR DRLG F/10019' MD TO 10080' MD. AST 2.0
1-1/2DEGREES ASSY FAILED TO BUILD ANGLE. PRETTY GOOD AT
HOLDING TOOL FACE. SLIDING UP BUT LOSING ANGLE. DECIDE TO
POOH F/CONVENTIONAL BUILD ASSY TO BUILD AND ROTATE THROUGH
ZONE 3. CBU. NOTHING UNUSUAL ACROSS SHAKERS AT BOTTOMS
UP. FLOW CHECK WELL. OK. STAND BACK KELLY. POOH F/BHA
#4. CHANGE OUT BHA. MU BIT. RIH W/BHA #4.
DEC,
Oil & Gas Cons. Commission
Anchor~.
WELL : E-24A
OPERATION:
RIG : DOYON 14
PAGE: 4
10/16/94 (12)
TD:10281' ( 198)
10/17/94 (13)
TD:10335' ( 54)
RIH W/BHA #5 MW: 0.0 VIS: 0
RIH TO SHOE. FILL PIPE. ATTEMPT TO CONT IN HOLE.
STACKING OUT AT SHOE (9839' MD). ATTEMPT TO WORK THROUGH.
NO GO. ATTEMPT TO WASH THROUGH. NO GO. BEGIN WASH/REAM.
WASH/REAM FROM 9839' MD TO 10080' MD. PREVIOUS BIT PULLED
4/16" OUT OF GAUGE. ROTARY DRILLING F/10083' MD TO 10281'
MD. ART 7.25 HRS. ASSY ONLY BUILDING AT +-2DGR/100' MD.
DECIDE POOH F/BENT HOUSING MOTOR. CBU. FLOW CHECK WELL.
OK. SET BACK KELLY. POOH F/BHA #5. PULL 10 STANDS. FLOW
CHECK WELL. OK. FINISH POOH. CHANGE OUT BHA. TEST BOPE.
OK.
ATTEMPT DIR DRL F/10335' MD MW: 0.0 VIS: 0
RIH TO 10125' MD. TAKE 10K. RU TO WASH/REAM TO BOTTOM.
WASH/REAM TO BOTTOM AT 10283' MD. TAKES 10K TO GET STRING
MOVING. NO TORQUE INCREASE WHILE WASH/REAM. ATTEMPT TO
SLIDE WITH HYCALOG DS71H PDC BIT. BIT WOULD NOT DRILL OFF
VERY WELL WITH PLANNED WOB OF 5-20K. NEVER SAW ANY
REACTIVE TORQUE GIVING TOOL FACE CHANGE AND NEVER SAW ANY
DIFFERENTIAL PRESSURE WHILE SLACKOFF TO GET WEIGHT TO BIT.
ROTATED SEVERAL TIMES. ROTATED OK. 40-60 FPH. COULD NOT
EVER GET ASSY TO SLIDE OR STALL. ADD WEIGHT IN EFFORT TO
GET DIFFERENTIAL. NO GO. AT END SLACKOFF UP 85K AND NEVER
SEE ANY DIFFERENTIAL. WHENEVER PICKUP AFTER STACK WEIGHT
PU CLEAN. DETRAILED RECAP OF RUN FAXED TO M. ZANGHI 0300
HRS. CBU. FLOWCHECK WELL. OK. SET BACK KELLY. POOH
F/BHA #6 (ROLLER CONE BIT & 1-3/4DGR BH). PULL 10 STDS.
FLOW CHECK WELL. CONTINUE POOH. C/O BIT AND MTR. MU NEW
BIT AND MTR. BIT SHOWED CHIPPIN GLOCATED BEHING DIAMOND
LAYER OF CUTTER. ALL TESTH WORN OVER TOPS OF CHIPS. GAUGE
IN GOOD COND. 6 OF NINE JUNK SLOT AREAS PACKED OFF W/SHALE
AND VERY SMALL CHIPS OF METAL DISPERSED IN SHALE. RIH
W/BHA #6. ATTEMPT TO DIRECTIONAL DRILL F/10,335' MD.
Gas Cons. commissio~
Anchor~
WELL : E-24A
OPERATION:
RIG : DOYON 14
PAGE: 5
10/18/94 (14)
TD:10394' ( 59)
CIRC HOLE CLEAN MW: 0.0 VIS: 0
CONTINUE ATTEMPT DIR DRILL F/10335' MD TO 10394' MD.
UNABLE TO EVER EFFECTIVELY SLIDE. STRING CONTINUES TO
STACK OUT. FLOW CHECK WELL. OK. SET BACK KELLY. POOH TO
9939' MD (100' BELOW TOP OF WINDOW) PUMP SVY. POOH TO
9889' MD (50' BELOW TOP OF WINDOW) PUMP SVY. CONTINUE
POOH. FLOW CHECK WELL INSIDE WINDOW. OK. CONTINUE POOH
LD 32 JTS DP. PULL MWD SOURCE. LD MWD, MU DMTR. XO, BIT.
BIT HAD A PATTERN OF SCRATCHES CIRCUMFERENTIALLY AROUND THE
LEG BACKS. SHOULDERS OF NOZZLE HOUSINGS HAVE WORN FLAT
SPOTS. THE SCRATCHES AROUND THE BIT ARE FROM +- 1/16" DEEP
AND SHINY TO JUST ON THE SURFACE AND BARELY VISIBLE. THIS
IS WHY THE DULL CHARACTERISTIC ON THE BIT GRADE WAS "JD".
MU PACKED ASSY FOR CLEANOUT TRIP. RIH W/PACKED ASSY. SLIP
AND CUT DRLG LINE. CONT'D RIH TO JUST ABOVE WINDOW AT
+-9800' MD. MU KELLY. PU WT 270K SO WT 165K. SLOACKOFF
AND ENTER WINDOW WITHOUT ROTATE OR CIRC. ENTERS OK.
SEVERAL KNOTS AS SLACKOFF. POOH. BEGIN WASH/REAM AT 80
SPM, 2500 PSI, 10-15K WOBo 1ST JT REAMED FEW SPOTS BEGIN
TAKE WT BUT DRILL RIGHT OFF. NO VISIBLE TORQUE INCREASE
BUT CAN HEAR ROTARY WORKING. PU 270-275K. SMOOTH
SLACKOFF. MAKE CONNECTION. AT TOP OF SADLEROCHIT +-9956'
MD TORQUE INCREASE AND GOES BETWEEN 320-340 AMPS. REAMING
SLOWLS. KELLY DOWN. PU 265-285. WORK AGAIN. PU AND PULL
OVER KNOT. WORK AGAIN. CLEANS UP. AT 010055' MD TOP
STABILIZER COMING INTO WINDOW AND OVER HUMP. 320-360 AMP
ALL WAY DOWN AND HAVING SLACKOFF LITTLE MORE WT (15K) TO
REAM STEADY. PU AT KELLY DOWN SMOOTH AT 275K. REAM
THROUGH AGAIN PRECAUTIONARY. AT TOP OF ZONE 3+-10118
TORQUE INCREASES AGAIN BETWEEN 320-360 AMPS. REAMINS SLOWS
GAIN. KELLY DOWN. PU SMOOTH AT 275K. REAM AGAIN. FROM
HERE ON DOWN ALL JTS REAMED ABOUT THE SAME. NO AREAS FROM
HERE DOWN EXTREMELY TIGHT. AT +-5'F/TD WORK PUMPS INEFFORT
TO FILL JUNK BASKETS IF NOT ALREADY FULL OF SAN D(SEVERAL
TIMES). TAG BOTTOM W/5K, 10K, 15K. NO REAL INCREASE IN
TORQUE NOTED. PU 285K AT TD. CBU. MIX AND PUMP SWEEP.
Anchor~
WELL : E-24A
OPERATION:
RIG : DOYON 14
PAGE: 6
10/19/94 (15)
TD:10612' ( 218)
10/20/94 (16)
TD:10634' ( 22)
10/21/94 (17)
TD:10197' ( 0)
10/22/94 (18)
TD:10257' ( 60)
PREPARE POOH F/PLUGBACK MW: 0.0 VIS: 0
CONT CIRC AND SWEEP HOLE ROTATING AT 60 RPM. PRIOR TO BU
MANY SAMPLES TAKEN CONTAINED SAND/SILTSTONE W/INCREASING
AMOUNTS OF METAL. JUST AT BOTTOMS UP ALOT OF WALLCAKE CAME
OVER SHAKERS WHEN SWEEP BEGAN COMING OVERA LOT OF BIGGER
PIECES OF METAL RETURNED. PUMPED ANOTHER SWEEP AFTER
PLACING MAGNETS IN TROUGH. THIS SWEEP CAME BACK RELATIVELY
CLEAN. FLOW CHECK WELL. OK. POOH 10 STDS. FLOW CHECK
WELL. CONTINUE POOH. TRIP THROUGH OPEN VERY SMOOTH AND
CLEAN. MU BIT AND ADJUST BH TO 2DEGR. MU MWD AND INSTALL
SOURCE. CHANGE SLEEVE ON MTR TO 5-1/4" RIH W/BHA 08
KELLY UP. BENCHMARK SVY. WASH TO BOTTOM. NO PROBLEMS
GOING THROUGH WINDOW. HOLE STILL VERY SMOOTH. DIR DRLG
F/10394' MD TO 10612' MD. TOOK OFF SLIDING SLOWLY BUT
IMMEDIATELY. NO PROBLEMS AT ALL STACKING OUT. NEEDED AN
IMMEDIATE BUILD RATE OF 17DGR/100'MD. UNABLE TO ACHIEVE
THAT IMEEDIATELY. AT 10394' MD BR .94. 1045 BR 9.63 10456
BR 16.29 10487-10547 CONSISTENT BR+- 17.5. UNABLE TO GET
HORIZONTAL BEFORE INTO KAVIK SHALE. PLAN IS TO PLUGBACK.
WOC MW: 0.0 VIS: 0
DRLG & SVYS F/10612-10635'. PICK UP & CHECK F/FLOW-PULL 10
STANDS & CHECK F/FLOW. POH TO PLUG BACK. LD BHA. SERVICE
WEAR RING. PICK UP 38 JTS 2-7/8" TBG & 96 JTS 5" DP & RIH
TO 10635. CIRC HOLE CLEAN WHILE BATCH MIXING CMT (12 BPM).
PUMP 5 BBL WATER-TEST LINES TO 30003 PUMP 7 BBL. WATER 25
BBL CMT 2 BBL. WATER-DISPLACE CEMENT W/162 BBL MUD. POH
12 STANDS (SLOW). REVERSE CIRC. DP CLEAN. APPLY 6500
PRESSURE ON HOLE & HOLD F/3 HRS. POH F/ DRLG ASSY.
PICK UP BHA 010 MW: 0.0 VIS: 0
POH-LD 117 JTS. 5" DP-38 JTS. 2-7/8" TBG. LD TBG. TOOLS
& PU BHA 09. RIH TO TOP OF 7" LINER @ 9567'. CUT DRLG
LINE. RIH TO 9916'- TAG SOFT CMT. DRLG SOFT CMT TO
10010' (CEMENT FIRM @ 10010 TO 10197). CIRC &
RECIPROCATE HOLE CLEAN. POH TO LINER TOP @9567'. CBU.
POH F/BHA 010. LD ROTARY ASSY & PU BHA 010.
POOH F/NEW BIT
MW: 0.0 VIS: 0
RIH W/BIT 010. DRILG F/10197 T/10238. ATTEMPT T/KO. MOTOR
STALLED. CHECK F/FLOW & POOH T/SHOE. CHECK F/FLOW & POOH.
HOLE IN GOOD CONDITION. PU NEW MUD MOTOR & INSTALL SOURCE.
MU NEW BIT & RIH. WASH & REAM F/10144 T/10238. DRLG F/10238
T/10257. BIT IS STALLING & PU IS TIGHT. CBU. CHECK F/FLOW &
POOH 10 STNDS. CHECK F/FLOW & POOH F/NEW BIT.
.\..,~.~ Liii & Gas Co.S. oommiss'mn
WELL : E-24A
OPERATION:
RIG : DOYON 14
PAGE: 7
10/23/94 (19)
TD:10406' ( 149)
10/24/94 (20)
TD:10660' ( 254)
10/25/94 (21)
TD: 10795' ( 135)
10/26/94 (22)
TD: 11209' ( 414)
10/27/94 (23)
TD:11499' ( 290)
10/28/94 (24)
TD:l1617' ( 118)
POOH F/BIT CHANGE
MW: 0.0 VIS: 0
POOH F/NEW BIT. CHANGE OUT BITS & ORIENT. RIH T/10247. WASH
& REAM F/102476 T/10257. DRLG & SURV. F/10257 T/10406. NOT
BUILDING ENOUGH ANGLE. CMU & CHECK WELL F/FLOW. POOH F/NEW
BHA. CHECK WELL F/FLOW AFTER 10 STNDS.
DRILLING
MW: 0.0 VIS: 0
ADJUST MOTOR T/2 DEG. & MU BIT. PULL WEAR RING & TEST BOPE,
CHK MANIFOLD & FLOOR VALVES. T/250/5000. LOWER KELLY
VALVE/LEAKING-REPAIR WHILE RIH. INSTALL WEAR RING, MWD
SOURCE & RIH T/SHOE. CUT DL. INSTALL & TEST LOWER KELLY
VALVE T/5000. RIH T/10365. WASH F/10365 T/10406. DRLG
T/10492. CBU. DRLG & SURV. F/10492 T/10554. CBU-DBL CHK
FIGURES ON ANGLE & TVD. DRLG & SURVEYS F/10544 T/10660.
BOPE TEST WAS WITNESSED BY JOHN SPAULDING W/AOGCC.
DRILLING
MW: 0.0 VIS: 0
DRLG & SURV. F/10660 T/10741. CBU CHK F/FLOW & PULL 10
STNDS. CHK F/FLOW & POOH F/NEW BHA. CHANGE BIT & BHA. RIH.
KELLY UP & RECHK SURVEYS F/PREVIOUS RUN. DRLG & SURV.
T/10795.
POOH F/NEW BIT
MW: 0.0 VIS: 0
DRLG & SURVEYS F/10795 T/11209. PULLING BIT F/HRS &
PENETRATION RATE. CBU. OBSERVE WELL F/10 MIN. POOH 10
STANDS & OBSERVE F/10 MIN. POOH F/NEW BIT. HELD SFTY MTG
WHILE CBU.
DRILLING 6" HRZTL HOLE
MW: 0.0 VIS: 0
HELD A 5MIN SFTY MTG W/EACH CREW.CONTINUE T/POOH F/BIT
CHANGE. CHANGE OUT MWD SOURDE, BIT & ORIENT. SERVICE THE
WEAR RING. RIH CHECK MWD @10246. CONTINUE T/RIH. DRILL 6"
HORIZONTAL HOLE F/11209 T/11499.
DRILLING 6" HRZTL HOLE
MW: 0.0 VIS: 0
HELD 2) 5-MINUTE SAFETY MEETINGS
CONTINUE DRILLING 6" HORIZONTAL HOLE F/11499 T/l1601. MOTOR
FAILED. CHECK F/FLOW. POOH F/NEW MOTOR. HOLE IN GOOD
CONDITION. CHANGE OUT MWD SOURCE, MOTOR ADJUST T/1 DEGREE,
ORIENT TOOL & RIH. MWD CHECK SHOT @ 4200. FILL PIPE @8300.
SLIP *& CUT DL 59.5'. CONTINUE T/RIH T/11541. REAM F/11541
T/l1601, 50' T/BTTM. CONTINUE DRILLING 6" HORIZONTAL HOLE
F/l1601 T/11617.
DEC 2 ?.
Oit & Gas Co.s. commission
Ar~chort
WELL - E-24A
OPERATION:
RIG : DOYON 14
PAGE: 8
10/29/94 (25)
TD:ll710' ( 93)
10/30/94 (26)
TD:l1541' ( 0)
10/31/94 (27)
TD:11710' ( 169)
11/01/94 (28)
TD: 9840' ( 0)
ATTEMP T/UNDERCUT HOLE
MW: 0.0 VIS: 0
CONTINUE DRILLING 6" HRZNTL HOLE. TRYING T/KNOCK ANGLE DOWN
T/GET BACK IN SAND. F/11617 T/l1710. DRILLING SHALE. PULL
BACK UP T/l1500. MAD PASS W/MWD F/11450 T/l1510. LOCATE
TOP OF SAND @11501. TRY T/UNDERCUT SAND SECTION F/l1500
T/11560. ANGLE 93.5 DEGREE & TRYING T/DROP.
REAM T/DROP ANGLE
MW: 0.0 VIS: 0
HELD A 5 MIN. SFTY MTG W/EACH CREWW.
CONT. UNDERCUTTING 6" HRZNTL HOLE & DRILL T/TOTAL DEPTH OF
11710. W/BHA #16. TRYING T/UNDERCUT IN SAND SECTION F/l1501
T/665. UNABLE T/SLIDE ASSY EVENLY. CAN'T ST HOLE. CONDUCTED
A 10 MIN FLOW CHECK. PULL BIT ON HRS. POOH & LD MOTOR.
CHANGE MWD & MU NEW BIT ON BHA #17. RIH FILL PIPE & CHK
MWD. RIH T/11533. TIME DRILL T/UNDERCUT 6" HOLE IN SAND
SECTION. REAM 1 HR. PER FT. F/8 HRS @ 0 WT ON BIT. 90 RPM
W/PENDULUM ASSY. TRY T/DROP ANGLE. ADJUST DDS TIME. CON'T
T/REAM TRYING T/DROP ANGLE. HAVE LOST 43 BBLS DURING THE
LAST 24 HRS.
RU T/CMT
MW: 0.0 VIS: 0
CON'T T/TRY T/UNDER CUT 6" HOLE IN SAND SECTION F/11542
T/11619. CON'T T/RUN OLD HOLE SURVEYS. UNABLE T/ST OLD
HOLE. CONDUCT 10 MIN FLOW CHECK & POOH T/PLUG BACK. LD MWD
STAND BACK BHA PU MULE SHOE & RIH OE. PU 22 JTS OF 3.5" DP.
PU PLUG CATCHER AFTER 1 STND 5". PU 65 JTS OF 5" DP & RIH
T/11700. BREAK CIRC. & COND HOLE WHILE RU T/CMT.
POOH @ KOP
MW: 0.0 ViS: 0
CONTINUE T/CIRC @11710. W/OE DP. WHILE BJ BATCH MIXED CMT.
PUMP 20 BBLS WATER, 82 BBLS CLASS G CMT, DROP PLUG KICK OUT
W/7 BBLS. WATER, DISPLACE W/RIG PUMP & SPOT 30 BBLS IN
ANNUL. PULL 10 STNDS T/10770 & PUMP 19 BBLS. SHEAR OUT
WIPER PLUG W/2500. PULL 16 STNDS T/9300. CIP @ 08:30 HRS.
EST TOP OF CMT @9700' CBU @ 10BPM W/2000PSI. POOH LD 110
JTS OF 5" & 26 JTS OF 3.5". TEST BOP'S 250/5000. BAG
T/250/2500. MANIFOLD T/250/5000. KOOMEY TEST ALL OK.
INSTALL WEAR RING. PU 6" BIT #17 ON BHA #18 & RIH T/4200.
TEST MWD. SLIP & CUT 59.5' DL. CONT. RIH TAG CMT @9656.
183' ABOVE 7" WINDOW @9839. CO FIRM CMT F/9656 T/9840. 1'
PAST TOP OF 7" SECTION. CIRC HOLE CLEAN.
~-~.,%V.a (iil ~- G&s Cons. comm%ssion
· Anchort
WELL ' E-24A
OPERATION:
RIG : DOYON 14
PAGE: 9
11/02/94 (29)
TD: 9862' ( 22)
11/03/94 (30)
TD:10225'( 363)
11/04/94 (31)
TD:10323' ( 98)
11/05/94 (32)
TD:10623' ( 300)
11/06/94 (33)
TD:10822' ( 199)
11/07/94 (34)
TD:l1085' ( 263)
KO PLUG @9840
MW: 0.0 VIS: 0
HELD A 5-MIN SFTY MTG. W/EA. CREW. LOST 0 FLUID IN 24 HRS.
HIGH LINE POWER F/24 HRS.
CONDUCT A 10-MIN FLOW CHECK @9840. POOH LD BHA. PU BIT #18.
2 DEGREE MOTOR ON KICK OFF BHA. RIH T/9840. KOP. FILL DP @
4139 & CHK MWD. TIME DRILL & KICK OFF PLUG 40 DEGREE T/THE
LEFT HIGH SIDE OF HOLE. 9840 - 9862. 7" SECTION F/9839 -
9889.
TRIP IN HOLE
MW: 0.0 VIS: 0
HELD A 5-MINUTE SFTY MTG W/EA. CREW.
TIME DRLG & ROTATING F/9862 T/10225. CBU CHECK F/FLOW, SBK,
PULL T/SHOE. CHECK F/FLOW @ BHA. POOH. CHANGE BHA
T/ROTATING ASSY & TIH.
CHANGE BTTM PIPE RAMS
MW: 0.0 VIS: 0
TIH T/4140. SLIP & CUT DL. FILL PIPE & TEST MWD. TIH TAG
TIGHT SPOT @9856. REAM F/10225 T/10325. SURVEY EA. JT
F/10038 T/10225 T/CHK DIR. DRLG F/10225 T/10323. CBU. CHK
F/FLOW SBK, PULL T/SHOE, CHK F/FLOW, POOH, CHK F/FLOW @
BHA. CHANGE OUT JARS PULL MWD PROBE & LAY DOWN 2 STABS.
PULL WB. SET TEST PLUG. CHANGE BTTM PIPE RAMS.
DRLG MW: 0.0 VIS: 0
BODY TEST BOPE, PULL TEST PLUG, INSTALL WEAR BUSHING. MAKE
UP MTR, ADJUST TO 1-3/4DGR & ORIENT. RIH, TEST MOTOR @ 450,
FILL PIPE @ 6800. KELLY UP @ 10275, WASH TO 10323. DRL &
SVY TO 10623.
TRIP IN HOLE MW: 0.0 VIS: 0
DRL & SVY F/10623-10822' CBU. 10 MIN FLOW CHECK. POH TO
10400'. KELLY UP, BREAK CIRC, MAD PASS W/MWD
F/10400-10440' POOH. NO PROBLEMS THROUGH OPEN HOLE
SECTION. CHAN~E BIT & MWD PROBE. CHECK MWD ORIENTATION.
RIH 3 STANDS, PULSE TEST MWD. RIH TO 6000' (D-1 DRILL.
SHUT IN TIME 60 SEC. HANDS IN PLACE 80 SEC.). FILL PIPE,
SLIP & CUT LINE. TRIP IN HOLE.
DRLG HORIZONTAL
DRL & SVY F/10822-11085'.
MW: 0.0 VIS: 0
DE.C, 2 ?.
~'~,s~c~ O'~ & Gas CoD~. fjommiss~on
Anchor~-
WELL : E-24A
OPERATION:
RIG : DOYON 14
PAGE: 10
11/08/94 (35)
TD:11335' ( 250)
11/09/94 (36)
TD:11687' ( 352)
11/10/94 (37)
TD:11773' ( 86)
11/11/94 (38)
TD:12240' ( 467)
11/12/94 (39)
TD:12240' ( 0)
11/13/94 (40)
TD:12240' ( 0)
DRLG HORIZONTAL MW: 0.0 VIS: 0
CIRC HOLE CLEAN. CHECK FOR FLOW. POH. CHECK FOR FLOW @
SHOE & BHA. CHANGE BIT & SLEEVE. ADJUST MTR, ORIENT &
INSTALL MWD PROBE. RIH, SHALLOW TEST MTR & MWD. FILL PIPE
@ 4200 & 7900'. KELLY UP @ 11010. BREAK CIRC. REAM
F/11015-11085'. NO PROBLEMS GETTING BACK TO BOTTOM. DIR
DRLG & SVYS EVERY 15' F/11085-11335'.
POOH MW: 0.0 VIS: 0
DRL & SVY F/11335-11687'. CIRC BOTTOMS UP. FLOW CHECK
WELL. POOH.
DRLG 6" HORIZ HOLE MW: 0.0 VIS: 0
CONT POOH FLOW CHECK AT 7" SHOE 9839' COMPLETE TRIP OUT
W/NO PROBLEMS. PULL MWD PROBE, CHANGE BIT'S, ADJUST MTR TO
1-1/4DGR & ORIENT. PULL WESR BUSHING, INSTALL TEST PLUG &
TEST BOPE, IVIANIFOLD 250-5000 PSI TEST HYDRILL TO 250-2500
PSI. TEST KELLY AND VALVES 250-5000 PSI, LOWER KELLY COCK
FAILED, WILL REPLACE ELEMENT WHILE TIH, PULL TESTPLUG, RUN
WEAR BUSHING. INSTALL MWD PROBE, RIH TO 4140' TEST MTR AND
MWD. SLIP AND CUT 59.5' DRLG LINE. CONT TO RIH 7" SHOE @
9839 TEST LOWER KELLY COCK 250-5000 PSI. O.K. FILL PIPE
TEST MWD RIH TO 11,605' WASH & REAM F/11605-11687' (NO
PROBLEMS). DRLG 6" HORIZONTAL HOLE DROP ANGLE SEAKING
SAND. 11687-11773'
TD 6" HORIZ MW: 0.0 VIS: 0
CONT DRLG & SVY 6" HORIZ. HOLE F/l1773-12240'TD. TOTAL SAND
579' THE BOTTOM 208' GOOD SAND. CIRC AND CLEAN HOLE.
REAM 6" HORIZ HOLE MW: 0.0 VIS: 0
POOH FOR 6" HOLE OPENER, CHECK FOR FLOW, L/D 34 JT'S 5" DP.
PULL MWD PROBE, L/D MWD, MOTOR AND BUMPER SUB, M/U BHA #7
6" HOLE HOLE OPENER, RIH FILL PIPE @ 6000' & 7" LINER TOP
9567' CONTINUE TO RIH STOPPED @ 10050' L/D 30 JT'S 5" DP
RIH TO 10050' START REAMING @ 10050' REAMING ROUGH
THROUGH HIGH BUILD DOG LEG'S TO 10862' AT 0600 HRS. SHOULD
START REAMING BETTER SOON HOLE ABOUT HORIZ NOW.
POOH TO RUN 5" LINER MW: 0.0 VIS: 0
CONT REAMING 6" HORIZ HOLE W/BHA #7 HOLE OPENER
F/10862-12240' CIRC 8 BPM @ 3000 PSI AND WORK PIPE (DROP
5" DP RABBIT). POOH TO 7" LINER TOP @ 9567' HOLE IN GOOD
CONDITION. SAW ONE BUMP AT 10650' 25K OVER PULL. CHANGE
OVER TO SEAWATER @ 7" LINER TOP 9567' TO LOWER HYDROSTATIC
280 PSI TO RUN 5" LINER. CONT TO POH STAND BACK 87 STANDS
5" DP.
Gas Con.~. Commission
Anchor~
WELL : E-24A
OPERATION:
RIG : DOYON 14
PAGE: 11
11/14/94 (41)
TD:12240' ( 0)
11/15/94 (42)
TD:12240' ( 0)
11/16/94 (43)
TD:12240' ( 0)
RUN 5" LINER MW: 0.0 VIS: 0
CONT TO POOH L/D 5" HWDP. CHANGE OUT CYCLENDER ON IRON
RUFFNECK. L/D 3-1/2" DP, HWDP & BHA #7, LOST ONE CONE OFF
SECURITY HOLE OPENER, (LOOKS LIKE CAME OFF WHILE TRIPPING
OUT, NO MARKS ON TOOL). P/U RR BIT #22 ON BHA #8, P/U
3-1/2" HWDP & DP, RIH TO PUSH CONE TO BOTTOM, WORK THROUGH
TIGHT SPOT 10900'. POOH L/D 3-1/2" DP & HWDP BNA #8 (TIGHT
SPOT 10900'). R/U AND RUN 2800' OF 5" 14.87# 13CR STL
LINER TOTAL 51 JT'S OF 66 JT'S RUN. USING TORQUE COMPUTER,
HAVE LAYED DOWN 4 JT'S DAMAGED JT# 55 PIN END ON MAKE UP
AND DAMAGED 53 BREAKING OUT 54, DAMAGED 52 BREAKING OUT 53,
ALL SHOWED PROPER MAKE UP ON COMPUTER.
CO RUN F/5" LINER
MW: 0.0 VIS: 0
2 STOP CARDS HANDED OUT. HELD 2 - 5 MIN. SFTY MTGS.
CON'T T/RUN 5" SLT LINER. TOTAL OF 66 JTS. PU TIW 9-5/8 X
5" LINER TOP PKR & HNGR. CIRC TOTAL LINER VOL. 53.5 BBLS.
RIH T/7" LINER TOP @ 9567 ON 5" DP. PUMP TOTAL PIPE VOL.
169 BBLS. CON'T RUNNING 5" SLT. LINER F/9567 T/12240. 6" OH
F/9839 T/12240. STARTED DIFFERENTIAL STICKING @ 11800 ON
EA. STAND. HAVING T/BREAK LOOSE COMING UP EA. TIME. CIRC.
6 BPM @ 1000PSI PIPE STUCK 5' OFF BTTM WHILE PUMPING. CON'T
CBU TILL ALL MUD REMOVED F/ANNUL. STOP PUMPING & MOVE PIPE
DOWN, STOPPED MOVING AFTER PUMP WAS RESTARTED. CBU WHILE
BATCH MIX CMT. PUMP 70 BBLS 5% KCL H20 AHEAD OF CMT. TEST
LINES T/4500 FOLLOW W/55 SX CMT FLUSH RAMPED WT F/Il T/
13.5 PPG LEAD SLURRY, FOLLOW BY 240 SX TAIL SLURRY @ 15.7
PPG NEAT CMT. DROP DART KO W/5BBLS H20 DISPLACE W/RIG PUMP
& FILTERED SEAH20, BUMP PLUG W/3500 PSI. CIP @ 19:00 HRS.
ON 11/14. FLTS HELD OK. LINER TOP @ 9400 PLUG CATCHER @
12153 SHOE @ 12240.SET LINER HNGR & LINER TOP PKR. REL.
F/LINER HNGR. REV. OUT 20 BBLS CMT FLUSH & KCL WATER. POOH
LD TOOL. PU 4-1/8 ECONO MILL, 5" CASG SCRAPER 12) 3-1/8"
DC'S, 13 JTS 2-7/8" PAC DP. 65 JTS OF 2-7/8" 8.7# DSS TBG,
&RIH
POOH F/FAST FILL VALVE
MW: 0.0 VIS: 0
CON'T RIH W/BHA #9 T/CLEAN OUT 5" LINER, TAG CMT @ 12138.
CIRC & TEST 9-5/8" & 5" CASG T/3500/15 MIN. OK. CLEAN OUT
5" LINER F/12138 DRILL PLUG @ 12153. CO CMT T/12168. REV.
CIRC & CHANGEOUT T/CLEAN FILTER SEAWATER W/6BPM @2300
PSI.POOH (SLM) STAND BACK 5" & 17 STD OF 2-7/8" DSS TBG. LD
14 JTS DSS. 13 JTS 32 7/8" PAC DP & 12) 3-1/8"DC. HELD SFTY
MTG W/ATLAS WL ON RIG FLOOR BEFORE STARTING PU OF DP
CONVEYED PERF. GUNS. PU 3-3/8" 4 SPF 60/120 DEGREE PHASING
PERF. GUNS (714' OF SHOTS & 486' OF BLANKS) RIH ON 51 JTS
OF 2-7/8" DSS TBG & 5" DP. TRY TO CLOSE HOWCO FAST FILL
VALVE. POOH T/REPAIR.
Oil & Gas Cons. Gommission
Anchon
WELL : E-24A
OPERATION:
RIG : DOYON 14
PAGE: 12
11/17/94 (44)
TD:12240' ( 0)
LAYING DOWN PERF GUNS
MW: 0.0 VIS: 0
HANDED OUT 3 STOP CARDS & HELD 3 SFTY MTGS.
CUT DL 52'. POOH T/FAST FILL VALVE. CHANGE OUT FAST FILL
VALVE & BYPASS PORT SUB. BPPS LEAKED. RIH W/PKR & PERF
GUNS. FILL PIPE @ 10082. TAG BTTM @12172. RU HOWCO T/TEST
MANIFOLD & SET PKR W/BTTM SHOT @12150. SHOOT FL. LEVEL IN
DP) (FLUID LEVEL @2220') HELD SFTY MTG. TEST LINES &
MANIFOLD T/3000. PRESS ANNUL. T/2000. GUNS FIRED - CON'T
PRESS ANNUL T/2500. FLOW TEST WELL F/30 MIN. MED BLOW IN
BUCKET. SHOOT FL. LEVEL (FLUID @ 1380 - 840' INFLUX 14.5
BBLS) REV. OUT FL. W/OILY FL T/TEST TANK. LOSS RATE @70
BPH. ATTEMPT T/PULL PIPE-GUNS STUCK CLOSE ANNUL PREV. &
BULLHEAD 35 BBLS. SEAWATER @ 8BPM. WASH SAND AWAY F/GUNS.
POOH STAND BACK 50 STNDS. DP. LD REMAINDER 5" DP 2-7/8"
TBG. & PERF GUNS.
11/18/94 (45)
TD:10735
PB:12166
NIPPLE DOWN BOPE
MW: 9.1 Seawater
HANDED OUT 2 STOP CARDS & HELD 2 SFTY MTGS.
LD PERF GUNS, ALL SHOTS FIRED. PULL WEAR RING. RU & RUN 231
JTS. OF 4.5" 12.6# L-80 ABM BUTTRESS TBG. MU TBG HNGR
CONNECT CL & TEST T/5000. STING INTO 5" LINER TOP W/TBG
TAIL & LAND TBG - RILDS. RU ON ANNUL. & REV. IN INHIB.
T/PCKR. @ 9344. DROP BALL, SET PKR & TEST BACKSIDE
T/3500#/30MIN & SHEAR RP VALVE. SET 2-WAY CHECK & NIPPLE
DOWN BOPE.
11/19/94 (46)
TD:10735
PB:12166
SIGNATURE:
RIG RELEASED
MW: 9.1 Seawater
HAD A 35 GAL. GLYCOL. SPILL; CAMP GENERATER RADIATOR BLEW
FULL OF SNOW & MOTOR OVERHEATRED-SPOUT BLEW OFF THE TOP &
SPILLED 35 GAL ON GRAVEL PAD, DURING 40 MPH WINDS.
NIPPLE DOWN BOP STACK-NU ADPTR FLNG. & TEST T/5000. OK.
CLEAN UP 35-GAL GLYCOL SPILL. NU & TEST TREE T/5000. RU &
PULL 2-WAY CHK. RU HOT OIL TRUCK & PUMP 145 BBLS DIESEL
DOWN ANNUL & U-TUBE T/TBG. SET BPV & SECURE WELL. CLEAN MUD
TANKS. RELEASE RIG @18:00 HRS ON 11/18.
(drilling superintendent)
DATE:
s~
AY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PBU/E-24A
500292176901
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 111594
MWD SURVEY
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9835 8382.33 8317.00
9844 8389.10 8323.77
9897 8428.12 8362.79
9929 8449.66 8384.33
9960 8470.60 8405.27
38 37 S 24.30 W .00 3957.12S 1050.32W
38 37 S 24.23 W .51 3962.05S 1052.54W
47 4 S 17.60 W 17.99 3995.87S 1065.29W
47 53 S 12.30 W 12.52 4018.54S 1071.33W
47 4 S 12.40 W 2.66 4040.85S 1076.22W
4068.26
4073.47
4108.78
4132.10
4154.88
9988 8490.12 8424.79
10019 8511.50 8446.17
10050 8532.79 8467.46
10081 8554.35 8489.02
10112 8575.83 8510.50
46 44 S 13.50 W 3.04 4061.18S 1080.89W
46 27 S 12.90 W 1.67 4083.19S 1086.06W
46 13 S 12.70 W .88 4104.95S 1091.00W
45 55 S 13.60 W 2.31 4126.75S 1096.09W
45 23 S 13.47 W 1.75 4148.11S 1101.23W
4175.68
4198.21
4220.45
4242.76
4264.65
10143 8597.71 8532.38
10175 8619.77 8554.44
10207 8642.50 8577.17
10236 8663.39 8598.06
10266 8684.27 8618.94
45 29 S 13.02 W 1.08 4169.74S 1106.33W
45 28 S 13.40 W .86 4191.59S 1111.45W
45 6 S 13.72 W 1.34 4213.91S 1116.84W
44 58 S 12.09 W 3.93 4234.30S 1121.51W
45 37 S 12.14 W 2.19 4254.94S 1125.94W
4286.80
4309.16
4332.02
4352.88
4373.94
10292 8701.97 8636.64
10323 8722.88 8657.55
10354 8743.37 8678.04
10383 8761.76 8696.43
10414 8780.28 8714.95
46 25 S 11.24 W 4.01 4272.90S 1129.66W
48 30 S 11.79 W 6.85 4295.22S 1134.20W
49 27 S 8.73 W 8.01 4318.40S 1138.40W
52 13 S 6.42 W 11.30 4340.78S 1141.36W
55 38 S 4.11 W 12.38 4366.10S 1143.68W
4392.26
4415.01
4438.55
4461.12
4486.50
10445 8796.70 8731.37
10476 8811.70 8746.37
10507 8826.10 8760.77
10538 8839.82 8774.49
10569 8852.51 8787.18
60 20 S 3.58 W 15.24 4392.30S 1145.44W
61 57 S 2.12 W 6.64 4419.48S 1146.79W
62 46 S 2.32 W 2.67 4446.97S 1147.86W
64 32 S .59 W 7.61 4474.67S 1148.56W
66 49 S .67 E 8.28 4502.75S 1148.54W
4512 . 68
4539. 77
4567. 12
4594. 62
4622.39
10600 8864.24 8798.91
10631 8875.70 8810.37
10663 8887.45 8822.12
10691 8897.24 8831.91
10724 8906.87 8841.54
68 4 S 2.90 E 7.89 4530.98S 1147.65W
68 39 S 3.12 E 1.95 4559.82S 1146.14W
68 39 S 2.86 E .75 4589.84S 1144.57W
70 52 S 3.98 E 8.71 4616.34S 1142.98W
74 8 S 5.61 E 11.27 4646.80S 1140.43W
4650.19
4678.50
4707.97
4733.95
4763.70
10755 8914.66 8849.33
10771 8918.34 8853.01
10785 8921.03 8855.70
10803 8924.00 8858.67
10816 8925.66 8860.33
76 56 S 6.80 E 9.70 4676.85S 1137.16W
77 29 S 7.02 E 3.55 4692.95S 1135.20W
79 13 S 7.25 E 13.13 4705.86S 1133.59W
81 54 S 7.01 E 14.82 4723.64S 1131.37W
83 12 S 7.34 E 10.58 4736.19S 1129.78W
4792.95
4808.59
4821.13
4838.39
4850.57
SPF--~!Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
PRUDHOE BAY DRILLING
PBU/E-24A
5oo2921769o1
NORTH SLOPE
COMPUTATION DATE: 11/28
/94
DATE OF SURVEY: 111594
MWD SURVEY
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
10833 8927.45 8862.12
10846 8928.57 8863.24
10869 8930.31 8864.98
10879 8931.10 8865.77
10897 8932.22 8866.89
85 0
85 27
85 37
85 44
87 1
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
S 6.49 E 11.34 4753.42S 1127.70W
S 5.92 E 5.43 4766.74S 1126.25W
S 7.24 E 5.90 4788.99S 1123.68W
S 6.71 E 5.19 4799.32S 1122.42W
S 6.74 E 7.25 4816.83S 1120.35W
4867.31
4880.28
4901.91
4911.94
4928.96
10910 8932.75 8867.42 88 13
10926 8932.95 8867.62 90 24
10941 8932.70 8867.37 91 34
10957 8932.23 8866.90 91 47
10973 8931.85 8866.52 90 53
S 6.81 E 9.36 4829.57S 1118.84W
S 5.61 E 15.13 4845.92S 1117.06W
S 6.56 E 10.36 4860.38S 1115.52W
S 5.56 E 6.40 4876.29S 1113.83W
S 6.85 E 9.79 4892.26S 1112.09W
4941.34
4957.26
4971.34
4986.82
5002.37
10988 8931.75 8866.42
11003 8931.86 8866.53
11020 8932.06 8866.73
11034 8932.17 8866.84
11051 8932.01 8866.68
89 52
89 22
89 8
90 1
91 1
S 9.14 E 17.08 4906.76S ll10.06W
S 7.13 E 13.15 4922.35S 1107.83W
S 8.15 E 6.48 4938.36S 1105.68W
S 6.46 E 13.40 4952.50S 1103.87W
S 7.57 E 8.59 4969.68S 1101.75W
5016.42
5031.51
5047.04
5060.75
5077.44
11067 8931.72 8866.39
11082 8931.47 8866.14
11098 8931.29 8865.96
11113 8931.18 8865.85
11128 8931.06 8865.73
91 6
90 48
90 27
90 20
90 37
S 6.11 E 9.32 4985.27S 1099.88W
S 7.08 E 6.76 5000.24S 1098.15W
S 8.24 E 7.72 5015.75S 1096.07W
S 8.03 E 1.52 5031.49S 1093.82W
S 8.08 E 1.89 5046.39S 1091.71W
5092.59
5107.14
5122.19
5137.43
5151.86
11144 8930.84 8865.51 90 57
11161 8930.59 8865.26 90 42
11176 8930.42 8865.08 90 40
11192 8930.24 8864.91 90 34
11208 8930.03 8864.70 90 55
S 7.96 E 2.29 5061.99S 1089.51W
S 7.68 E 2.23 5078.66S 1087.22W
S 7.66 E .27 5093.38S 1085.24W
S 9.39 E 10.95 5109.02S 1082.89W
S 8.41 E 6.56 5124.64S 1080.45W
5166.96
5183.12
5197.39
5212.52
5227.61
11224 8929.72 8864.39 91 17
11240 8929.27 8863.94 91 54
11255 8928.77 8863.44 91 54
11268 8928.36 8863.03 91 39
11286 8927.88 8862.55 91 26
S 8.64 E 2.66 5140.81S 1078.02W
S 9.26 E 5.42 5156.79S 1075.51W
S 8.72 E 3.64 5171.43S 1073.19W
S 8.94 E 2.51 5184.56S 1071.15W
S 8.07 E 5.05 5202.06S 1068.53W
5243.25
5258.69
5272.83
5285.52
5302.46
11302 8927.49 8862.16 91 21
11318 8927.11 8861.78 91 23
11332 8926.76 8861.43 91 21
11349 8926.35 8861.02 91 30
11364 8925.95 8860.62 91 28
S 7.66 E 2.66 5217.70S 1066.37W
S 9.03 E 8.53 5233.59S 1064.04W
S 8.51 E 3.62 5247.82S 1061.85W
S 8.82 E 2.09 5264.10S 1059.37W
S 9.42 E 3.94 5279.15S 1056.95W
5317.61
5332.99
5346.74
5362.48
5377.01
SP.'~-~ZY-SUN DRILLING SERVICES
ANCHOP~AGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PBU/E-24A
500292176901
NORTH SLOPE
COMPUTATION DATE: 11/28
/94
DATE OF SURVEY: 111594
MWD SURVEY
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11380 8925.65 8860.32
11395 8925.45 8860.12
11411 8925.21 8859.88
11426 8924.95 8859.62
11442 8924.68 8859.35
90 38 S 10.22 E 7.12 5295.21S 1054.17W
90 49 S 8.20 E 13.36 5310.19S 1051.74W
90 57 S 9.74 E 10.07 5325.35S 1049.35W
91 1 S 9.70 E .46 5340.61S 1046.73W
90 54 S 8.05 E 10.24 5356.56S 1044.24W
5392.49
5406.96
5421.60
5436.32
5451.73
11457 8924.48 8859.15
11474 8924.37 8859.04
11489 8924.30 8858.97
11505 8924.24 8858.91
11520 8924.14 8858.81
90 34 S 7.94 E 2.29 5371.23S 1042.18W
90 13 S 9.00 E 6.81 5387.48S 1039.76W
90 16 S 9.48 E 3.18 5402.51S 1037.32W
90 10 S 8.92 E 3.62 5418.03S 1034.81W
90 34 S 7.95 E 6.84 5433.19S 1032.56W
5465.94
5481.66
5496.17
5511.16
5525.83
11537 8923.97 8858.64
11553 8923.77 8858.44
11568 8923.43 8858.10
11584 8922.88 8857.55
11600 8922.03 8856.70
90 31 S 8.80 E 4.95 5450.24S 1030.05W
91 1 S 8.92 E 3.34 5465.47S 1027.67W
91 30 S 8.83 E 3.23 5480.73S 1025.29W
92 30 S 8.42 E 6.88 5496.13S 1022.95W
93 31 S 8.26 E 6.36 5512.16S 1020.60W
5542.32
5557.04
5571.79
5586.67
5602.19
11616 8921.00 8855.67
11631 8920.02 8854.69
11637 8919.70 8854.37
11647 8919.24 8853.91
11662 8918.60 8853.27
93 52 S 7.11 E 7.54 5527.95S 1018.47W
93 25 S 7.66 E 4.66 5543.14S 1016.50W
92 49 S 7.64 E 10.33 5548.89S 1015.73W
92 38 S 9.28 E 17.01 5558.46S 1014.31W
91 59 S 9.86 E 5.49 5574.08S 1011.68W
5617.49
5632.23
5637.81
5647.07
5662.13
11678 8918.21 8852.88
11694 8918.00 8852.67
11709 8917.88 8852.55
11724 8917.84 8852.51
11740 8917.98 8852.65
90 57 S 9.59 E 6.92 5589.24S 1009.08W
90 29 S 10.60 E 7.04 5604.82S 1006.30W
90 24 S 11.12 E 3.33 5620.36S 1003.32W
89 54 S 10.14 E 7.66 5634.42S 1000.68W
89 8 S 10.99 E 6.96 5650.62S 997.66W
5676.75
5691.76
5706.69
5720.22
5735.80
11757 8918.41 8853.08
11771 8918.98 8853.65
11787 8919.66 8854.33
11803 8920.37 8855.04
11818 8921.10 8855.77
87 52 S 11.93 E 9.54 5666.75S 994.39W
87 37 S 10.62 E 9.24 5680.91S 991.57W
87 25 S 11.32 E 4.57 5696.53S 988.54W
87 21 S 11.95 E 4.09 5711.66S 985.42W
87 21 S 11.70 E 1.58 5727.12S 982.19W
5751.28
5764.87
5779.88
5794.39
5809.21
11834 8921.85 8856.52
11848 8922.60 8857.27
11864 8923.42 8858.09
11879 8924.16 8858.83
11896 8924.86 8859.53
86 56 S 11.57 E 2.81 5742.06S 979.11W
87 6 S 10.93 E 4.57 5756.17S 976.30W
87 6 S 11.47 E 3.32 5772.06S 973.16W
87 7 S 11.30 E 1.15 5786.43S 970.27W
88 3 S 10.98 E 5.93 5802.84S 967.03W
5823.54
5837.09
5852.35
5866.13
5881.89
SP?~-'~IY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
PRUDHOE BAY DRILLING
PBU/E-24A
500292176901
NORTH SLOPE
COMPUTATION DATE: 11/28/9
DATE OF SURVEY: 111594
MWD SURVEY
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS
INCLN DIRECTION
DG MN DEGREES DG/100
TOTAL
RECTANGULAR cOOeD INATES
NORTH/SOUTH EAST/WEST
VERT.
SECT.
11911 8925.32 8859.
11927 8925.65 8860.
11942 8925.94 8860.
11958 8926.22 8860.
11973 8926.51 8861.
99 88 34 S 10.48 E 4.65
32 88 56 S 10.11 E 3.41
61 88 55 S 9.25 E 5.50
89 88 58 S 9.96 E 4.62
18 88 55 S 9.41 E 3.54
5818.075 964.15W 5896.54
5833.165 961.41W 5911.06
5848.575 958.78W 5925.92
5863.765 956.21W 5940.58
5879.185 953.58W 5955.44
11989 8926.71 8861.
12004 8926.78 8861.
12020 8926.73 8861.
12035 8926.61 8861.
12051 8926.57 8861.
38 89 32 S 9.55 E 4.12
45 89 56 S 10.10 E 4.57
40 90 27 S 9.68 E 4.16
28 90 27 S 10.66 E 6.53
24 89 49 S 8.73 E 12.61
5894.405 951.04W 5970.12
5909.065 948.50W 5984.25
5924.905 945.73W 5999.52
5939.675 943.08W 6013.74
5955.565 940.37W 6029.06
12066 8926.73 8861.
12082 8927.01 8861.
12097 8927.33 8862.
12113 8927.65 8862.
12126 8927.88 8862.
40 88 58
68 88 53
00 88 46
32 88 53
55 89 8
S 8.36 E 5.94
S 9.70 E 8.72
S 10.48 E 5.14
S 11.20 E 4.69
S 9.17 E 15.24
5970.835 938.08W 6043.84
5986.045 935.66W 6058.53
6001.155 932.97W 6073.08
6016.435 930.04W 6087.76
6029.635 927.67W 6100.48
12157 8928.35 8863.
12187 8928.84 8863.
12239 8929.75 8864.
02 89 6
51 89 2
42 88 55
S 10.27 E 3.58 6059.935 922.48W
S 10.62 E 1.16 6090.085 916.92W
S 11.20 E 1.16 6140.305 907.24W
6129.69
6158.70
6206.96
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 6206.96 FEET
AT SOUTH 8 DEG. 24 MIN. WEST AT MD = 12239
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 188.42 DEG.
TIE IN POINT 9835.33'
WINDOW POINT 9844'
INTERPOLATED DEPTH 12239'
SPI<=~.Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PBU/E-24A
500292176901
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 111594
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33 FT.
OPEP~ATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9835 8382.33 8317.00 3957.12 S 1050.32 W 1453.00
10835 8927.61 8862.28 4755.20 S 1127.49 W 1907.72 454.72
11835 8921.92 8856.59 5743.20 S 978.88 W 2913.41 1005.69
12239 8929.75 8864.42 6140.30 S 907.24 W 3309.25 395.84
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
· SP~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 6
PRUDHOE BAY DRILLING
PBU/E-24A
500292176901
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 111594
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
9835 8382.33 8317.00 3957.12 S 1050.32 W 1453.00
9952 8465.33 8400.00 4035.29 S 1075.00 W 1487.00
10097 8565.33 8500.00 4137.74 S 1098.75 W 1532.13
10239 8665.33 8600.00 4236.21 S 1121.92 W 1574.37
34.00
45.13
42.24
10389 8765.33 8700.00 4345.54 S 1141.84 W 1624.05
10603 8865.33 8800.00 4533.68 S 1147.52 W 1737.90
12239 8929.75 8864.42 6140.30 S 907.24 W 3309.25
49.67
113.85
1571.35
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
PRUDHOE BAY DRILLING
PBU/E-24A ~
500292176971
NORTH SLOPE
COHPUTATION DATE: 11/28/94
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
9835 8382.33 8317.00
9844 8389.10 8323.77
10190 8668.30 8602.97
10206 8681.78 8616.45
10236 8706.01 8640.68
10270 8732.11 8666.78
10300 8755.53 8690.20
10332 8779.55 8714.22
10363 8802.63 8737.30
10395 8825.73 8760.40
10426 8847.82 8782.49
10457 8869.03 8803.70
10488 8888.01 8822.68
10519 8905.10 8839.77
10550 8920.58 8855.25
10582 8933.67 8868.33
10613 8944.02 8878.69
10644 8951.78 8886.45
10675 8956.83 8891.50
10705 8958.95 8893.62
10737 8958.19 8892.86
10768 8955.67 8890.34
10799 8952.67 8887.34
10829 8949.81 8884.48
10859 8947.13 8881.80
10891 8944.78 8879.45
10922 8942.68 8877.35
10953 8940.42 8875.09
10983 8938.14 8872.81
11015 8936.01 8870.68
11045 8934.49 8869.16
11076 8933.41 8868.08
11106 8932.28 8866.95
11137 8931.03 8865.70
11166 8929.63 8864.30
kY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
DATE OF SURVEY: 102894
MWD SURVEY
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33
OPERATOR: BP EXPLORATION
FT.
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
38 37 S 24.30 W .00 3957.12S 1050.32W 4068.26
38 37 S 24.23 W .51 3962.05S 1052.54W 4073.47
34 35 S .00 E 4.31 4159.91S 1097.12W 4275.72
35 24 S .70 W 5.44 4169.35S 1097.18W 4285.07
37 10 S 2.90 W 7.31 4187.13S 1097.74W 4302.73
40 20 S 3.60 W 9.59 4208.05S 1098.93W 4323.61
40 13 S 4.40 W 1.73 4227.85S 1100.32W 4343.40
41 50 S 4.10 W 5.09 4248.70S 1101.87W 4364.25
42 48 S 3.10 W 3.78 4269.67S 1103.19W 4385.19
42 34 S 2.60 W 1.32 4290.96S 1104.25W 4406.40
45 45 S 3.10 W 10.39 4312.39S 1105.31W 4427.75
49 52 S 4.50 W 13.45 4335.73S 1106.87W 4451.07
54 19 S 5.60 W 14.70 4360.02S 1109.03W 4475.41
58 21 S 8.70 W 15.51 4385.48S 1112.24W 4501.08
62 57 S 9.70 W 14.82 4412.67S 1116.65W 4528.61
67 53 S 8.90 W 15.84 4440.89S 1121.27W 4557.21
72 56 S 8.50 W 16.39 4469.66S 1125.67W 4586.31
77 55 S 8.80 W 16.17 4499.17S 1130.16W 4616.16
83 15 S 9.00 W 17.27 4529.31S 1134.88W 4646.67
88 37 S 10.60 W 18.69 4558.71S 1139.96W 4676.49
94 3 S 12.00 W 17.30 4590.52S 1146.31W 4708.89
95 19 S 12.50 W 4.38 4620.62S 1152.85W 4739.63
95 39 S 11.60 W 3.06 4651.07S 1159.35W 4770.70
95 24 S 11.10 W 1.88 4680.05S 1165.16W 4800.21
94 41 S 10.30 W 3.51 4709.80S 1170.79W 4830.47
93 48 S 8.90 W 5.22 4740.99S 1176.06W 4862.09
94 3 S 7.70 W 4.00 4771.20S 1180.47W 4892.63
94 19 S 7.20 W 1.83 4801.77S 1184.46W 4923.45
94 8 S 5.80 W 4.56 4832.35S 1187.95W 4954.22
93 43 S 4.00 W 5.93 4863.26S 1190.60W 4985.18
91 54 S 2.00 W 8.76 4894.03S 1192.21W 5015.85
92 10 S 1.80 W 1.13 4924.33S 1193.22W 5045.97
92 5 S 2.40 W 1.99 4954.75S 1194.33W 5076.23
92 33 S .10 W 7.58 4985.64S 1195.01W 5106.88
93 4 S .90 E 3.96 5014.04S 1194.81W 5134.95
MI 0
~,~¢ 0i~ & Gas Conq. Commission
Anchor;
tY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PBU/E-24A ST2
500292176971
NORTH SLOPE
COMPUTATION DATE: 11/28
/94
DATE OF SURVEY: 102894
MWD SURVEY
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
11196 8927.98 8862.65 93 13 S 2.20 E 4.35 5044.03S 1194.00W 5164.50
11228 8926.25 8860.92 92 58 S 2.50 E 1.22 5075.91S 1192.69W 5195.84
11258 8925.06 8859.73 91 30 S 3.80 E 6.45 5106.35S l191.01W 5225.71
11289 8924.73 8859.40 89 41 S 4.80 E 6.63 5137.46S 1188.67W 5256.14
11321 8925.01 8859.68 89 19 S 5.10 E 1.51 5168.84S 1185.96W 5286.78
11352 8925.29 8859.96 89 37 S 4.00 E 3.63 5200.25S 1183.46W 5317.49
11384 8925.06 8859.73 91 13 S 4.00 E 5.04 5231.89S 1181.24W 5348.46
11415 8924.15 8858.82 92 7 S 4.70 E 3.64 5262.89S 1178.89W 5378.79
11448 8922.77 8857.44 92 44 S 5.20 E 2.45 5295.17S 1176.09W 5410.31
11479 8921.15 8855.82 93 10 S 5.60 E 1.86 5326.55S 1173.12W 5440.91
11511 8919.29 8853.96 93 30 S 5.50 E 1.08 5358.20S 1170.05W 5471.77
11542 8917.25 8851.92 93 56 S 5.60 E 1.47 5389.37S 1167.02W 5502.17
11573 8915.03 8849.70 94 21 S 5.00 E 2.36 5419.86S 1164.19W 5531.91
11605 8912.71 8847.38 94 3 S 5.80 E 2.71 5451.20S 1161.23W 5562.48
11636 8910.51 8845.18 93 59 S 5.00 E 2.54 5482.50S 1158.27W 5593.01
11668 8908.62 8843.29 92 43 S 6.10 E 5.19 5514.47S 1155.16W 5624.18
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5634.16 FEET
AT SOUTH 11 DEG. 49 MIN. WEST AT MD = 11668
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 188.42 DEG.
TIE IN POINT 9835.33'
WINDOW POINT 9844'
INTERPOLATED DEPTH 11668.77'
.~Y-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE 3
PRUDHOE BAY DRILLING
PBU/E-24A ST2
500292176971
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 102894
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9835 8382.33 8317.00
10835 8949.25 8883.92
11668 8908.62 8843.29
3957.12 S 1050.32 W 1453.00
4685.84 S 1166.30 W 1886.08 433.08
5514.47 S 1155.16 W 2760.15 874.07
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
tY-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PBU/E-24A ST2
500292176971
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 102894
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9835 8382.33 8317.00 3957.12 S 1050.32 W 1453.00
9940 8465.33 8400.00 4017.15 S 1073.84 W 1475.13 22.13
10064 8565.33 8500.00 4088.18 S 1091.17 W 1499.05 23.92
10186 8665.33 8600.00 4157.86 S 1097.08 W 1521.12 22.07
10313 8765.33 8700.00 4236.12 S 1100.96 W 1548.27 27.14
10452 8865.33 8800.00 4331.51 S 1106.57 W 1586.68 38.42
11668 8908.62 8843.29 5514.47 S 1155.16 W 2760.15 1173.47
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
SP' !Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING ~-
PBU/E-24A ~
500292176971
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 102094
MWD SURVEY
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
9835 8382.33 8317.00 38 37 S 24.30 W .00 3957.12S 1050.32W 4068.26
9844 8389.10 8323.77 38 37 S 24.23 W .51 3962.05S 1052.54W 4073.47
10031 8543.66 8478.33 31 0 S 7.60 W 6.45 4063.90S 1083.13W 4178.69
10065 8572.18 8506.85 30 42 S 5.70 W 3.07 4080.82S 1085.11W 4195.72
10097 8599.56 8534.23 30 47 S 3.40 W 3.71 4097.05S 1086.40W 4211.97
10128 8626.13 8560.80 31 36 S 2.90 W 2.71 4113.12S 1087.28W 4227.99
10158 8652.10 8586.77 33 12 S 1.40 W 5.82 4129.59S 1087.89W 4244.37
10190 8677.99 8612.66 34 35 S .00 E 5.14 4146.98S 1088.10W 4261.61
10221 8704.06 8638.73 35 35 S 1.40 E 4.03 4165.30S 1087.88W 4279.70
10240 8719.20 8653.87 36 12 S 2.00 E 3.72 4176.26S 1087.55W 4290.49
10282 8752.34 8687.01 37 42 S 4.50 E 5.12 4201.14S 1086.13W 4314.89
10313 8777.43 8712.10 38 12 S 3.90 E 1.95 4220.65S 1084.70W 4333.99
10344 8801.63 8736.30 38 5 S 2.30 E 3.23 4239.63S 1083.67W 4352.61
10363 8816.32 8750.99 38 47 S .70 E 6.48 4251.29S 1083.36W 4364.10
10394 8840.12 8774.79 39 5 S 4.30 E 7.46 4270.50S 1082.52W 4382.98
10425 8863.77 8798.44 42 5 S 2.70 E 10.20 4290.73S 1081.29W 4402.81
10456 8886.03 8820.70 47 12 S 3.40 E 16.36 4312.69S 1080.12W 4424.37
10487 8906.15 8840.82 52 35 S 6.20 E 18.59 4336.49S 1078.10W 4447.61
10517 8923.09 8857.76 57 47 S 7.70 E 17.99 4360.69S 1075.14W 4471.12
10547 8938.14 8872.81 63 5 S 10.10 E 18.67 4386.90S 1071.02W 4496.44
10578 8951.61 8886.28 65 0 S 10.60 E 6.34 4414.13S 1066.04W 4522.65
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4541.03 FEET
AT SOUTH 13 DEG. 34 MIN. WEST AT MD = 10578
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 188.42 DEG.
TIE IN POINT 9835.33'
WINDOW POINT 9844'
INTERPOLATED DEPTH 10578.73'
An~hO~: '
SP[ !Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
PRUDHOE BAY DRILLING
PBU/E-24A ST
500292176971
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 102094
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9835 8382.33 8317.00
10578 8951.61 8886.28
3957.12 S 1050.32 W 1453.00
4414.13 S 1066.04 W 1627.12 174.12
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SP'~ IY-SUN DRILLING SERVICES
ANCHOtLAGE ALASKA
PAGE
PRUDHOE BAY DRILLING ~
PBU/E-24A ST
500292176971
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 102094
JOB NUMBER: AK-MW-40082
KELLY BUSHING ELEV. = 65.33 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9835 8382.33 8317.00 3957.12 S 1050.32 W 1453.00
9938 8465.33 8400.00 4014.82 S 1072.37 W 1473.52 20.52
10057 8565.33 8500.00 4076.77 S 1084.70 W 1491.88 18.36
10174 8665.33 8600.00 4138.27 S 1088.09 W 1509.35 17.47
10298 8765.33 8700.00 4211.18 S 1085.36 W 1533.19 23.84
10427 8865.33 8800.00 4292.30 S 1081.22 W 1562.07 28.88
10578 8951.61 8886.28 4414.13 S 1066.04 W 1627.12 65.05
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
Memory Multi-Finger Caliper
Log Results Summary
Company:
Log Date:
Log No.'
Run No.:
r ~?~.J Desc:.
Pirie2 Desc'
Pipe2 Use
BP EXPLORATION (ALASKA) INC.
June 11, 2000
4113
1
4.5' i2=6 Jb~ BTRS
Tubing
?.T: i~, ib~ CR'i3
Liner
Well:
Field:
State:
APl No.:
Top Lo9 !ntvl1.:
Bot. Log intvll.'
'i'o;'~, f eft lr!i',.;l?.:
&,.:oi:. i_,::,f; in?IX.:
E-24a
Prudhoe Bay
Alaska
50-029-21769-01
9,409 Ft. (MD)
':i,.'i.u~ i'-i.
i ~l OOC l--l. (Vi!..))
Inspection Type-
Sidetrack Candidate Tubing/Liner Inspection
COMMENTS ·
This survey was run to assess the condition of the tubing with respect to corrosive and mechanical
damages. The caliper recordings indicate that the 4.5" tubing is mostly in good to fair condition, with
maximum corrosive penetrations in excess of 40% wall recorded in only 6 joints. No corrosive penetrations
in excess of 50% wall are recorded throughout the interval logged. The interval of most severe corrosive
damage recorded ( 30% - 50% wall thickness) runs between joints 134 and 190, from 5,400' to 7,600'. The
damage appears in the form of isolated pits, tending to form in a line on the Iow side of the pipe. The
distribution of the damage recorded throughout the tubing string is illustrated in the Caliper Overview page of
this report.
What appears to be a "slot" milled completely through the tubing wall, approximately 3.125" wide and 4.7'
long is recorded at the very bottom of the tubing tail, through the Wire Line Entry Guide. Tool off-center
motion through this interval indicates that the tubing is stabbed into the liner tie-back sleeve at an angle, with
the "slot" appearing near the Iow side of the pipe, which also appears to be the outside of the "bend" between
the tubing tail and tie-back sleeve. A cross-sectional drawing and 3D picture of this interval is included in the
report.
The 5" liner appears to be in good condition with no penetrations in excess of 12% wall thickness recorded.
No significant ID restrictions or areas of significant cross-sectional wall loss are recorded throughout the
interval logged.
- MAXIMUM RECORDED WALL PENETRATIONS ·
Isolated Pitting (49%) Jt. 170 @ 6,851' MD
Isolated Pitting (45%) Jt. 172 @ 6,937' MD
Isolated Pitting (44%) Jt. 177 @ 7,136' MD
Isolated Pitting (42%) Jt. 184 @ 7,409' MD
Isolated Pitting (42%) Jt. 190 @ 7,629' MD
MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS ·
No areas of significant cross-sectional metal loss are recorded throughout the 4.5" tubing logged, with the
exception of the "slot" that appears to be milled in the end of the tubing tail.
~;, ~" TaJB~~'-~;¢'~ - MAXIMUM RECORDED ID RESTRICTIONS ·
No significant ID restrictions due to deposits or pipe deformity are recorded throughout the 4.5" tubing
inspected.
.... ~ ~'~':~ - MAXIMUM RECORDED WALL PENETRATIONS '
No penetrations in excess of 12% wall thickness are recorded throughout the interval of 5" liner logged.
¥- L~i-~ - MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS '
No areas of cross-sectional wall loss (>6%) are recorded throughout the interval of 5" liner logged.
~'~ L~2~F~ - MAXIMUM RECORDED ID RESTRICTIONS '
No significant ID restrictions, in excess of 0.07 inches, are recorded in the interval of 5" liner logged.
!Field Engineer' J. Morgan
Analyst: J. Burton
Witness: Steve Farris
PDS Caliper Overview
Body Region Analysis
Well: E-24a Survey Date: June 11, 2000
Fie~d: PRUDHOE BAY Tool Type: MFC40 No. 00432
Company: BP EXPLORATION (ALASKA) INC. Tool Size: 2 3/4"
Country: USA No. of Fingers: 40
Analysed: ). Burton
Tubing: Size Weight Grade & Thread Nom. OD Nom. ID Nom. Upset
4.5 ins 12.6 ppf b80 BTRS 4.5 ins 3.958 ins 4.5 ins
Penetration and Me~al Loss (% wall)
~ penetration body ~¢~ metal loss body
0to I to 10to 20 to 40 to above
1% 10% 20% 40% 85% 85%
N umber of joints analysed (total = 246)
Pene 1 129 62 48 6 0
Loss 88 158 0 0 0 0
Damage Configuration ( body )
1 O0
60
4O
isolated genera[ l[ne grig hole / poss
Number of }oints damaged (total = 106)
93 0 13 0 0
Damage Profile (% wall)
~ penetration body ~:~ metal loss body
0 5O
0
49
96
GLM 3
143
GLM 2
GLM 1
Bottom of Survey = 232
100
Analysis Overview page 2
3 1/8" Wide "Sbt"
Recorded in Bottom of 4.5'~ TTL
BP E×p]oradon Maska
?~:'udhoe Bay
We~i: Ed4a
Date: ~u~'~e i t, 2000
XN-Nipple @ 9,397' elmd
-- -- Top of "Slot" @ 9,404' eJmd
4.5" WLEG @ 9,409' eJmd
Tie-Back Sleeve (5" ID)
Top of 5" 15¢ 13CR Liner @ 9,415' eJmd
15# 130R Liner
PDS CA ER JOINT TABULATION
Pipe: 4.5 ins 12.6 ppf L-80 BTRS
Wall thickness. Body: 0.271ins Upset- 0271
Nominal ID: 3.958 ins
Upset
inches
ins
Welt:
Field:
Company:
Country: USA
Date: June 11, 2000
,o6[
E-24a
PRUDHOE BAY
BP EXPLORATION (ALASKA) IN C.~;~/;/penetration body
~?; metal loss body
Minimum
inches
3.83 PUP
3.82 PUP
3.84
3,84
3.87
3,88
3.85 Line shallow corrosion.
3.83
3
3.85
3.84
3.87
3.85
3.83
383
3.84
3.86
3.89
3.90 Line corrosion,
3.88
3.86
3.84
3.87
3 85
3.85 Line shallow corrosion,
3.88
3.86
3.86
3.86
3.90
3,88
3.87
3.89
3.88
3.91
3.88
3.86
3,88
3.89
3.86
3.87
3.89
3.88
3.89
3.89
3.91
3,90
3,90
3.88
3.90
1Damage profile
wall)
50 1 O0
Pipe Tabulations page I
PDS CAL~R JOINT TABULATION SH~
Pipe: 4.5 ins 12.6 ppf L-80 BTRS Well:
Wall thickness. Body: 0.271ins Upset = 0.271ins Field:
Nominal ID: 3.958 ins Company:
Country:
Date:
E-24a
PRUDHOE BAY
BP EXPLORATION (ALASKA) INC4~4~ penetration body
USA ~ .~:~ metal loss body
June [ 1, 2000
pint Penetration I Metal Projection Minimum Damage profile
No. Upset Body Loss Upset Body tD Comments (% wall)
inches inches % % inches inches inches 3 50 10C
49 [ 0 ,02 7 2 0 .06] 3.89
50 0 .02 7 2 0 .06 3.89 --
51 0 .03 101 2 0 0 3.88
52 0 .01 5 I 0 I .08 3.86
53 I 0 [ .01 3 2 [ 0 .05 3.90
53.1 0 J .02 6 1~ 0 ,06 3.89 PUP
53.2 0 ] 0 0 0 0 0 3.89 SSSV Assr.
53.3 0 } .00 2 1 0 0 3.89-] PUP
54 O[ .01 5 1 0 .051 3.89 I
55 0 [ .02 6 2 0 .06 3.90 ~
56 t 0 ' .02 7 2 0 .06 ~1'
57 0 .021 7 i 0 ~ 3.87
58 0 .0~_ 6 1 0 .0_6. 3.88
59 0 .02 3 0 .05 3.90
60 0 .01 6 2 0 .05 3.90
61 0 .01 ~ 1 O .06 3.89
62 0 .02 2 0 .06 3.90
63 0 .01 2 ( 0 .07 3.87
64 0 .03 1C 3] 0 i .05 3.90
65 0 .01 1 0 ,05 3.90
66 0 .02 1 0 .05 3.90 J
67 0 .02-1 I 0 .os 3.89
68 0 .02 2 0 .06 3.86
69 0 .01 I 0 .05 3.91
70 0 .02 l 0 .06 3.89
71 0 .02 I 0 .05 3.90
72 0 .01 t 0 .06 3.90
73 0 .04 1~ 3 0 --'.06~ 3.89 Line shallow corrosion.
74 0 .92 1 0 .0__71 3.88 -
~a 0 .02 2 0 .06 3.89 I
76 0 .05 18J 4 ---0 0 3.91 Line shallow corrosion.
77 0 .03 10 I 0 .06 3.89
78 I 0 .03 l0 2 0 .05] 3.90
~-9 I 0 .021 9 2i 0 .05 3.90
80[ 0 .021 8 1 0 .05 3.90
81 I 0 .02} 9 2 0 .05 3.90
82 0 .02 8 3 0 .07 3.87
~83 0 .03 11 3 0 I 0 3.90
84 0 .02 7 1 0 I .05 3.88
85 0 .02 9 / 0 0 3.89
86 0 I .03 _9_ 3 0 0 3.90
~.8_7 0] .02 9 2 0 .05 3.90
88 0 ~ .02 6 1 0 .0~ 3.88
8~_9 0 I .03 10 3 0 --- .05 3.89
90 0 .03 _ 11 I 0 0 3.89
_91 0 .03 11 I O_ i '05 3.91 .
92 0 .03 12 2 0 ,05 3,90 Shallow pitting.
93 0 .03 ] 1 1 0 0 3.87
94 I 0 .031 13 3 i 0 0 3.91 Shal[owpitting=
95 0 .02 E 2_ 0 [- .06 3.89
Pipe Tabulations page 2
PDS CA ER JOINT TABULATION
Pipe: 4.5 ins 12.6 ppf [-80 BTRS Welt:
Wall thickness. Body: 0.271ins Upset = 0.271ins Field:
Nominal ID: 3.958 ins Company:
Country:
Date:
l'-24a
PRUDHOE BAY
BP EY, PLORATION (ALASKA) INC.~f?~ penetration body
USA ~,;~? metal loss body
June 11, 2000
Joint [ Penetration Metal Projection J Minimum Damage profile
No. Upset Body Loss Upset Body ID Comments (% wall)
inches inches % % inches inches inches $0 10C
96 0 .03 / t 4 0 .04 3.89
97 i 0 .02 8 2 0 -] 0 3.87
98 ! 0 j .03 12 2 0 0 3.91 tShallowpiilJng.
99 0 ] .04 13 2 0 0 3.91 IShallow pitting.
1 O0 0I .03 l 0 2 0 0 [ 3.87
101 0 [ .03 13 2 0 .05 3.89 Shallow pitting.
~2 I 0[ .04 15 2 0 ] 0 3.90 Shallow pitting.
103 I 0 .03 11 2 0 .05 3.90 Shallow pitting.
104 t 0 .03 li 2 0 .07[ 3.88
105[ 0 .03 12 2 ~ 0 .04[ 3,90 Shallow pitting. ~ '
106 0 .03 10 3 0 I .06[ 3.87
107 0 .04 13 2 0] 0 3.90 Shallow pitting
107.1 0 .04 1___5_ 1 0 0 3.82 PUP Line shallow corrosion.
107.2 0 0 0 0 0 0 3.80 GLM 3 (LATCH @ 7:00)
107.3 0 .03 9 I 0 .0~ 3.80 PUP
108 0 .03 11 4 0 0.09 3.90
109 0 .03 12 3 0 3.86 Line shallow corrosi_on.
110 0 .03 11 3 0 .06 3.88
11 I 0 .03 13 3 0 .05 3.89 Shallow pitting.
11~2 0 I .04 16 2 0 0 3.89 I Shallow pit~i~ng.
113 0 .03 10 4 0 .06 3.8__9__
14 0 .04 15 2 0 0 3.92 lSha]low pitting.
15 0 .05 17 ;~ 0 0 3.91 [ Shallow pitting.
16 0 .03 12 3 ! 0 .03 3.89 1Shallowpitting.
17 0 .05 18 2 0 [ .02 3.90 Shallow pitting.
118 0 .03 12 2 0 ! .05 3.90 Shallow pitting.
119 0 .05 20 3 0 0 392 Shallow pitting.
120 0 -- .05 18 2 0 0 3.91 Shallow pitting.
121 0 .03 12 2 0 .03 3.88 Shallow pitting.
122 0 .07 27 t 0 0 ~."~ t isolated pitting. _ -'-__
f23 0 .06 21 2 0 0 3.91 Isolated pitting,
124 0 .06 2J 2 0 0 3.91 Line corrosion,
125 0 .08 2~ __3 0 0 3.90 Isolated pitti_ng.
126 0 .05 I~ 4 0 .06 %87 Shallow pitting.
127 0 .06 22 4 0 .04 3.91 Line corrosion.
t28 0 .05 1~ 4 0 0 3.90 Shallow pKtin~__
129 0 .02 __ 3 -- 0 0 3.89
130 _~) .06! 22 3 0 .04 3.91 Li~ecorrosion.
131 0 .0829 2 0 0 3.9t ! Line corrosion.
132 0 [ .04 16 3 0 .06 3.88 Shallow pitting.
133 0I _ .04 [ 1~5 3 0 .05 3.90 Shallow pitting.
1_~4 0 .08I ~ 2 0 0 3,91 isolated pitting~
la5_ 0 .08 30 I 0 [ 0 3.91 Isolated pitting.
13~_6 0 .06 21 3 0I O_ 3.91 Isolated pitting.
137 0 .03 10 t 0 0 3.91
138 0 ~06 22 4 0 .05 3.89- Line corrosion.
139 0 .06_ 23 3 0 .03 3.90 Isolated pitting.
140 0 .06 24 4 0 [ 0 3.87 Isolated pitting.
141 0 .08 29t 1 0[ 0 3.87_ Isolated pitting.
142 0 .0.8 _31! 2 0 [ 0 3.92 Isolated pitting.
Pipe Tabulations page 3
PDS CAL R JOINT TABULATION
Pipe: 4.5 ins 12.6 ppf b80 BTRS Well:
Wallthickness. Body: 0,271ins Upset=O.271ins Field:
Nominal ID: 3.958 ins Company:
Country:
Date:
E-24a
PRUDHOE BAY
BP EXPLORATION (ALASKA) [NC.~ penetration body
USA ¢¢;;~¥ metal loss body
June 11, 2000
Joint Penetration J Metal Projection Minimum I Damage profile
No. Upset Body Loss Upset Body ID Comments (%wall)
inches inches % % inches inches inches ) 50 10C
-143 I 0 .06 23 2 0 .03 3.89 isolated pitting.
~44[ 0 .05 17 4 0 .04 3.89 Shallow pittin8,
145 [ 0 .05 18 3 0 0 3.91 Shallow pitting.
146 0 .05 17 ? 0 0 3.92 Shallow pitting.
147 0 .07 25 2 [ 0 0 I 3.88 Isolated pitting. -
3,92 Isolated pitting.
148 0 .07 27 1 0 0
149 0 .09 34 2 0 0.06 3.91 Line conosion.
150 0 .08 28 3 0 3.88 Isolated pitting.
1510 .09 32 I 0 i I 3.92 Isolatedpittin~-
152 0 .05 20 3 0 3.91 Shallow pitting.
153 0 .05 20 4 0 3.92 Shallow pitting. -
154 0 .07 26 3 0 0 3.90 Isolated pitting.
155 .07 .07 26 2 0 0 3.91 Isolated pitting.
156 0 .06 23 2 0 0 3.92 Isolated pitting.
157 0 .07 25 3 0 0 3.90 Isolated pitting.
158 0 .08 28 3 0 .03 3.89 Isolated pitting.
159 0 ~06 21 3 0 i 0 3.90 Isolated pitting.
160 0 .09 34 2 0 0 3.92 isolated pitting. __
161 0 .06 21 2 0 0 3~90 Isolated pitting.
162 0 ~ .08 28 2 0 0 3.92 Isolated pitting.
163 0 .07 2~ 1 0 0 3.93 Isolated pitting.
164 .08 .11 40 3 0 0 3.90 Isolated pitting.
16.~ I 0 ,10 37 2 0 0 3,91 Isolated pitting.
166 0 .08 31 2 0 0 3.9/ Isolated pittiug.
167 O_ .03 lC 2 0 0 3.93
168 0 .07 2~ 2 0 0 3.92 isolated pitting.
1~69 0 .09 32 / 0 0 3.94 !Isolated pitting.
170 0 .13 49 I 0 0 3.93 Isolated pitting.
171 0 .10 37 3 0 0 3.93 Isolated pitting.
172 ! .10 .12 45 2 0 0 3,92 Isolated pitting.
173 0 ! .09 32 2 0 0 3.93 Isolated pitting.
174 .06 .02 7 2 0 0 3.91 Pitting in upset.
1~F5 .I0 .11 40 2 0 0 3.93 Isolated pitting.
176 0 .09 35 I 0 0 3.91 Isolated pitting:
177 .08 .I 2 44 2 0 0 3.92 Isolated pitting.
178 0 [ .10 38 4 0 0 3.92 Isolated pitting.
179 0 .07 27 3 0 0 3.93 Isolated pitting.
[ 8~0 0 .02 6 3 0 0 i 3.90
181 ! 0 .05 17 2 0 0 3.91_ Shallow pitting.
182 .09 .08 31 1 0 0 3.92 Isolated pitting.
183 0 .11 41 3 0 0 3.93 Isolated pitting.
184 0 .1 I 42 1 0 0 a. _3 Isolated pitting.
'1_85 0 .09 35 2 0 0 3.93 Isolated pitting.
186 0 .02 6 2 0 0 3.90
187 0 .09 32 3 0 I 0 3.90 Isolated pitting. _
188 0 .08 3(} 1 -0 0 3.94 Isolated pitting. --
189 0 .03 12 1 0 0 3.94 Shallow pitting.
1_90 0 .12 42 3 0 0 3.91 Isolated pitting:
191 0 .06 22 I 0 0 3.91 Isolated pitting.
191.1 0 .01 5 1 0 0 3.90 PUP
Pipe Tabulations page 4
PDS C
JOINT TABULATION
Pipe: 4.5 ins 12.6 ppf L-80 BTRS Welt:
Wall thickness. Body: 0,27lins Upset = 0.271 ins Field:
Nominal ID: 3~958 ins Company:
Country:
Date:
E-24a
PRUDHOE BAY
BP EXPLORATION (ALASKA) INC.~F~:~ penetration body
USA ~:,(~: metal loss body
June 11, 2000
-Joint Penetration MetalI Projection Minimum I Damage profile
No~ Upset Bodv Loss Upset [Body ID Comments (% wall)
inches inche_s~1% % inchesJinches inches 50 10(
191.2 0 I0 I C 0 0 0 [ 3.87 GLM 2 (LATCH @ 3:00)
191.3 0 I .02 9 1 0 .03 3.87 PUP
192 0I .04 13 1 0 0 3.92 Shallow pitting.
t93 0 [ .03 12 I 0 [ 0 3.93 Shallow pitting.
194 0 .01 z 1 0 0 I 3.93
195 0 .06 21 1 0 0 3.94 Isolated pitting.
196 0 .05 2C 3 0 0 3.95 Shallow pitting.
197 0 .04 15 2 0 0 3.95 ] Shallow pitting.
198 0 .04 15 1 0 0 3.93 Shallow pitting.
199 0 .05 [ 1 0 0 3.93 Shallow pitting. ~ I
200 0 .05 18 I 0 0 3.94 I Shallow pitting.
201 0 .03 10 1 0 0 3.94 I
202 ' 0 .03 12 / 0 0 3,94_ Shallow pitting.
203 I 0 .03 10 1 0 0 3.94
.03 l0 I 0 0 3.94
204 0
.~05 0 ... .02 8 1 0 0 3.93
206 0 .03 11 1 0 0 3.94
207 0 .02 6 1 0 0 3.95
208 [ 0 .01 4 I 0 0 3.92
209 0 .02 6 2 0 [ 0 3.95
210 0 .01 4 1 0 I 0 3.94
211 - 0 ,02 6 1 0] 0 3.95
212 0 .03 1 l 1 0 0 3.94 Shallow pitting.
2 t3 0 .04 13 1 0 0 3.94 Shallow pitting.
214 0 .01 4 1 0 0 i 3.95
215 0 .02 7 2 0 0 [ 3.96
216 0 .03 13 I 0 0 3.93 Shallow pitting.
217 0 ,04 14 6 0 .03 3.92 Shallow pitting.
218.. 0 .04 16 1 0 0 3.96 Shallow pitting.
21~? O .01 3 1 0 0 3.94
[220 0 .02 fi 4 0 0 3.94
221 0 .04 13 4 [ 0 .04 3.93 Shallow pitting.
222 0 .02 8 3 0 i 0 3.93
2_a 0 .02 c 1 0 0 3.95
224 0 .01 1 0 0 I 3.96
2~2.5 0 .01 4 0 0I 3.92
226 0 .02 2 0 0 [ 3.95
227 I 0 .0l 1 0 0[ 3.95
228[ 0 .01 1 0 0 [ 3.92
~8.1 [ 0 [ .02 7~ I 0 0 3.84 PUP
~T28.2' 0I 0 0 O_ 0 3.89 GLM I {LATCH @ 12:00)
228.3 0 ~ .01 4 3 0 0 3.89 PUP
229 _0[ .02 4 0 I 0 3.93
230 0 .02 j ; i 1 0 I 0 3.95
231 0 .01 4 3 0 0 3.92 [
231.1 0 .0i 4 1 0 0 3.95/pup
231.2 0 0 0 0 0 0 3.82 X-Nipple
231.3~ 0 [ .01 3 1 0 0 3.97 PUP
23,. 1 0 I .0, 0 0 3.93 __
Pipe Tabulations page 5
PDS CAL R JOINT TABULATION SI
Pipe: 4.5 ins 12.6 ppf L-80 BTRS Well:
Wallthickness. Body:0.271ins Upset=0.271ins Field:
Nominal ID: 3.958 ins Company:
Country:
Date:
E-24a
PRUDHOE BAY
BP EXPLORATION (ALASKA) INC.~t~; penetration body
USA ~:~ metal loss body
June 11, 2000
Joint Penetration Metal Projection Minimum I Damage profile
No. Upset Body Loss Upset Body ID Comments (% wall)
inches inches % % inches inches inches __ 0 50
_al .6 0 .02 8 1 0 .03 3.94 PUP
231 8 0 .01 1 0 0 3.96 PUP ~
°I °1°
232 ~ 0 .32 100 35 0 ~ 0 3.93 ~U~W[~G ~.~ ~
Damage Classifications
Penetration / projection class, in order of damage severit~ Hole - penetration exceeds 85% of nominal wall thickness
Ring - damage area exceeds 75% of circumference, but depth iange does not exceed I ~ pipe ID
Line - damage depth range exceeds 5 * pipe ID, but extends less than 22% of circumference
General - damage depth range exceeds 1 * pipe [D and/or extends more than 22% of circumference
Isolated - damage depth range does not exceed 5 * pipe ID or extend more than 22% of circumference
Damage reporting threshold - 30 thou inches deviation in body, 50 thou in upset. Modal line length - 0.800 feet.
Pipe Tabulations page 6
Well: E-24a
Field: PRUDHOE BAY
Company: BF' EXPLORATION {ALASKA) INC,
Country: USA
Tubing;: 4.5 ins /2.6 ppi' L-80 BTRS
PDS Caliper Sections
Survey Date: Juae 11, 2000
Tool Type: MFC40 No. 00432
Tool Size: 2 3/4"
No. of Fingers: 40
Analysed: J, Burton
Cross section for Joint 232
Tool speed = 66
Nominal ID = 3.958
Nominal OD = 4.500
Rernaining
wall area = 64 %
Tool deviation = 45 °
at depth 9403.61 ft
Finger 1
Radius: 2.282 ins
Approx, 3.125 h~. wide slot recorded in bottom 4.7 Ft, o1' Tubing Tail HIGH SIDE = UP
Cross-Sections page 1
Well: E~24a
Field: PRUDHOE BA'~
Company; BP EXPLORATION (ALASKA) INC.
Coul~trv: USA
Tubing: 4.5 ins 12.6 ppf L-80 BTRS
PDS Caliper Sections
Survey Date: June 11, 2000
Tool Type: MFC40 No. 00432
Tool Size: 2 3/4"
No. of Fingers: 40
Analysed: J. Burton
Cross section for Joint 170 at depth
Tool speed = --
~ominal D = 3.958
'qorninal OD = 4.500
Remaining
wa~l area = 98 %
Tool devlat~or = 48
6850.8 ft
Finger 20 Penetration = 0./32 ins
Isolated Pit 0,13 In. = 49% Wall Pen. HIGH SIDE = UP
Cross-Sections page 2
Well: E-24a
Field: PRUDHOE BAY
Company: BP E×PLORATION (ALASKA) iNC.
Country: USA
Tubins: 4.5 ins /2~6 ppf D80 8TRS
PDS Caliper Sections
Survey Date: June /1, 2000
Toot 't'ype: MFC40 No. 00432
Tool Size: 2
No. of Fingers: 40
Analysed: J. Burton
Cross section for Joint 172
Tool speed = 67
Nominal ID = 3.958
Nominal OD = 4.500
Remaining
wall area = 98 %
Tool deviation = 48 °
at depth 6936.65 ft
Finger 20 Pe~etratio*~ = 0.122 ins
Isolated Pil 0.12 In. = 45% Wall Pen. I. IIGH SIDE = UP
Cross~Seclions page 3
PDS ,_ALi PER
Pipe: 4.5 ins 12.6 ppf L-80 BTRS
Wall thickness. Body: 0.271ins Upset = 0.271ins
Nominal ID: 3.958 ins
Joint Depth Length Measured t Type
No. ID
feet feet inches
.1 12.99 4.04 3.934 Pup
.2[ 17.03 9.71 3.937 Pup
1 26.74 39.18 3.949
2 65.92 40.34 [ 3.939
3 106.26 42.09[ 3.956
4 148.35 41.95 3.967
5 190.30 40.04 3.952
6 230.34 40.62 3.938
7 270.96 42.28 3.941
8 313.24 ] 42.54 [ 3.950
9 355.78 42.15 3.945
10 397.93 40.58 3.959
11 438.51 40.14 3.945
12 478.65 39.93 3.938
13 518.58 39.00 3.929
14 557.58 41.87 3.942
15 599.45 41.61 3.952
16 641.06 40.31 3.962
1 7 681.37 41.96 3.979
18 723.33 41.99 nominal
19 765.32 40.95 3.943
20 806.27 42.70 3.945
21 848.97[ 38.74 3.956
22 887.71 39.27 3.939
23 926.98 41.46 3.959
24 968.44 41.89 nominal
25 1010.33 41.88 3.959
26 1052.21 38.45 3.946
2 7 1090.66 43.03 nominal
28 1133.69 38.22 3.960
29 1171.91 38.61 [ 3.962
30 1210.52 39.33[ 3.965
31 1249.85 39.17 3.969
32 1289.02 39.15 3.960
33 1328.17 38.26 3.965
34 1366.43 39.76 3.963
35 1406.19 41.,_'7 3.949
36 1447.46 41.52 nominal
37 1488.98 39.19 3.959
38 1528.17 39.91 3.948
39 1568.08 39.32 3.952
40 1607.40 38.70 3.959
41 1646.10 39.31 3.955
42 1685.41 39.72 3.969
43 1725.13 39.22 3.955
44 1764.35 39.60 3.967
45 1803.95 39.24 3.967
46 1843.19 39.16 3.965
47 1882.35 39.53 3.952
48 1921.88 39.14 3.963
OINT TALLY SHEET
Well: E-24a
Field: PRUDHOE BAY
Company: BP EXPLORATION (ALASKA)INC.
Country: USA
Date: June 11, 2000
Joint Depth Length Measured Type
No. ID
feet feet inches
49 1961.02 39.15 3.962
50 2000.1 7 39.16 3.964
51 2039.33 39.68 3.956
52 2079.01 39.71 3.961
53 2118.72 39.66 3,959
53.1 2158.38 9.52 3.955 Pup
53.2 2167.90 14.23 nominal Sssv
53.3 2182.13 9.65 3.953 Pup
54 2191.78 39.29 3.962
55 2231.07 37.87 3.964
56 2268.94 39.16 3.962
57 2308.10 38.29 norninal
58 2346.39 39.52 3.960
59 2385.91 39.70 3.955
60 2425.61 39.58 3.960
61 2465.19 39.13 3.959
62 2504.32 39.45 3.956
63 2543.77 39.23 3.955
64 2583.00 37.88 3.956
65 2620.88 38.59 3.962
66 2659.47 39.84 3.962
67 2699.31 40.14 3.960
68 2739.45 42.16 3.948
69 2781.61 38.65 3.961
70 2820.26 39.57 nominal
71 2859.83 39.09 3.961
72 2898.92 39.23 nominal
73 2938.15 40.01 3.962
74 2978.16 39.23 3.949
75 301 7.39 39.10 3.952
76 3056.49 39.62 3.960
77 3096.11 39.12 3.962
78 3135.23 38.68 norninal
79 31 73.91 39.37 3.960
_ 80 3213.28 39.21 3.962
81 3252.49 38.62 3.962
82 3291.11 39.04 nominal
83 3330.15 39.24 nominal
84 3369.39 39.40 3.955
85 3408.79 39.21 3.954
86 3448.00 39.71 3.959
87 3487.71 37.75 3.960
88 3525.46 39.35 3.948
89 3564.81 39.42 3.951
90 3604.23 38.89 3.966
91 3643.12 38.25 3.962
92 3681.37 39.29 3.961
93 3720.66 38.71 3.960
94 3759.37 38.49 3.966
95 3797.86 39.74 3.954
Joint Tally page 1
PDS ,_.ALIPER JOINT TALLY SHEET
Pipe: 4.5 ins 12.6 ppf L-80 BTRS
Wall thickness. Body: 0.271ins Upset = 0.271ins
Nominal ID: 3.958 ins
Joint Depth Length Measured Type
No. ID
feet feet inches
96 3837.60 42.76 3.970
97 3880.36 35.59 3.943
98 3915.95 39.71 3.962
99 3955.66 39.19 3.963
100 3994.85 39.77 3.964
101 4034.62 39.60 3.960
102 4074.22 38.64 3.962
103 4112.86 38.46 nominal
104 4151.32 34.81 3.955
105 4186.13 40.41 3.963
106 4226.54 I 38.16 3.954
107 4264.70 39.18 3.964
107.1 4303.88 9.79 3.935 Pup
107.2 4313.67 8.47 nominal GIm3
107.3 4322.14 10.80 3.930 Pup
108 4332.94 41.66 3.963
109 4374.60 39.96 I 3.931
110 4414.56 40.00 3.944
111 4454.56 40.63 3.951
112 4495.19 39.67 3.955
113 4534.86 40.93 3.959
114 4575.79 39.71 3.968
115 4615.50 37.88 nominal
116 4653.38 42.51 nominal
11 7 4695.89 39.76 nominal
118 4735.65 39.44 3.947
119 4775.09 39.53 3.969
120 4814.62 39.11 3.969
121 4853.73 33.10 3.949
122 4886.83 39.65 3.962
123 4926.48 38.56 3.970
124 4965.04 38.91 3.970
125 5003.95 38.09 3.951
126 5042.04 42.50 3.955
127 5084.54 43.21 3.970
._
128 5127.75 42.36 3.967
...
129 5170.11 43.04 3.961
130 5213.15 42.27 3.973
131 5255.42 38.42 3.963
132 5293.84 41.93 3.951
133 5335.77 38.97 3.949
134 5374.74 38.50 3.968
135 5413.24 39.66 3.967
136 5452.90 42.11 3.983
137 5495.01 39.11 3.962
138 5534.12 42.16 3.971
139 5576.28 34.71 3.961
140 5610.99 41.40 3.945
141 5652.39 41.76 3.941
142 5694.15 39.99 3.973
Well: E-24a
Field: PRUDHOE BAY
Company: BP EXPLORATION (ALASKA) INC.
Country: USA
Date: June 11, 2000
Joint Depth Length Measured Type
No. ID
feet feet inches
143 5734.14 40.41 3.953
144 5774.55 43.34 3.979
145 581 7.89 43.57 3.970
146 5861.46 41.48 3.981
I 147 5902.94 39.64 nominal
148 5942.58 39.54 3.976
149 5982.12 38.58 3.969
150 6020.70 41.78 3.961
151 6062.48 39.27 3.971
152 6101.75 43.18 3.973
153 6144.93 43.21 3.974
154 6188.14 42.23 3.962
155 6230.37 39.97 3.968
156 62 70.34 39.44 3.973
157 6309.78 42.01 3.966
158 6351.79 41.83 3.964
159 6393.62 39.88 3.963
160 6433.50 38.22 3.970
161 6471.72 37.78 3.970
162 6509.50 38.89 3.976
163 6548.39 38.47 3.976
164 6586.86 39.1 7 3.961
165 6626.03 39.28 3.968
166 6665.31 39.1 7 3.965
167 6704.48 39.74 3.972
168 6744.22 39.19 3.974
169 6783.41 39.66 3.982
170 6823.07 39.11 3.978
171 6862.18 39.02 3.982
172 6901.20 39.09 3.973
1 73 6940.29 39.90 3.975
1 74 6980.19 39.09 3.973
1 75 7019.28 39.71 3.983
1 76 7058.99 39.21 3.977
177 7098.20 40.08 3.972
178 7138.28 39.49 3.972
1 79 71 77.77 39.24 3.977
180 721 7.01 39.80 3.966
181 7256.81 39.09 3.975
182 7295.90 38.50 3.983
1.83 7334.40 39.12 3.980
184 73 73.52 39.38 3.982
185 7412.90 39.03 3.982
186 7451.93 39.02 3.956
187 7490.95 42.92 3.964
188 7533.87 38.97 3.984
189 7572.84 39.13 3.980
190 7611.97 39.30 3.980
191 7651.27 40.06 3.989
191.1 7691.33 9.72 3.953 Pup
Joint Tally page 2
PDS . ALIPER JOINT TALLY SHEET
Pipe: 4.5 ins 12.6 ppf L-80 BTRS
Wall thickness. Body: 0.271 ins Upset = 0.271 ins
Nominal ID: 3.958 ins
Joint Depth Length Measured Type
No. ID
feet feet inches
191.2 7701.05 7.34 nominal GIm2
191.3 7708.39 11.34 3.944 Pup
192 7719.73 39.11 3.985
193 7758.84 I 39.48 3.982
194 7798.32 I 39.47 [ 3.966
195 7837.79 38.67 3.984
196 7876.46 39.60 3.984
197 7916.06 39. t 9 3.983
198 7955.25 39.16 3.982
199 7994.41 38.91 3.989
200 8033.32 39.44 3.984
201 8072.76 37.76 3.983
202 8110.52 38.77 3.990
203 8149.29 38.67 3.987
204 8187.96 39.88 3.982
205 8227.84 38.54 3.993
206 8266.38 40.55 3.989
207 8306.93 39.21 3.989
208 8346.14 39.02 3.973
209 8385.16 38.92 3.990
210 8424.08 35.63 3.988
211 8459.71 40.56 3.986
212 8500.27 39.01 3.995
213 8539.28 38.67 3.989 I
214 8577.95 39.16 3.988t
215 861 7.11 39.46 3.998
216 8656.57 39.11 3.988
21 7 8695.68 42.08 3.982
218 8737.76 39.43 3.996
219 8777.19 39.09 3.991
220 8816.28 42.84 3.991
221 8859.12 36.51 3.991
222 8895.63 41.85 3.970
223 8937.48 38.55 3.988
224 8976.03 39.39 3.995
225 9015.42 36.66 3.976
226 9052.08 39.08 3.993
227 9091.16I 39.67 4.001
228 9130.83I 39.68 3.984
228.1 9170.51 8.93 3.939 Pup
228.2 91 79.44 10.21 nominal Glml
228.3 9189.65 9.88 3.937 Pup
229 9199.53 41.31 3.974
230 9240.84 36.49 3.985
231 9277.33 41.00 3.938
231.1 9318.33 8.42 3.990 Pup
231.2 9326.75 3.84 nominal X-nip
231.3 9330.59 8.23 3.991 Pup
231.4 9338.82 17.99 nominal I Pkr
231.5 9356.81 9.59 3.988[ Pup
Well: E-24a
Field: PRUDHOE BAY
Company: BP EXPLORATION {ALASKA) INC.
Country: USA
Date: June 11, 2000
Joint Depth Length Measured Type
No. ID
feet feet inches
231.6 9366.40 5.92 3.989 Pup
231.7 9372.32 5.12 nominal X-nip
231.8 9377.44 9.51 3.996 Pup
231.9 9386.95 10.38 nominal Xn-nip
232 9397.33 unknown 3.938 WLeg
Joint Tally page 3
Well: E-24a
Field: PRUDHOE BAY
Company: BP EXPLORATION (ALASKA) INC.
Country: USA
PDS Caliper Overview
Body Region Analysis
Survey Date: June 11, 2000
Tool Type: MFC40 No. 00432
Toot Size: 2 3/4"
No. of Fingers; 40
Analysed: J. Burton
Tubing: Size Weight Grade & Thread Nora.OD Nora. ID Nora. Upset
5 ins 15 ppf 13CR, STL 5 ins 4,408 ins 5 ins
Penetration and Meal Loss (% wall)
penetration body ~!;~ metal loss body
0to 1 to 10to 20 to 40 to above
1% 10% 20% 40% 85% 85%
Number of joints analysed (total = 28)
Pene 3 23 2 0 0 0
Loss 2 26 0 0 0 0
Damage Configuration ( body )
Number of ioints damage~ (tom[ = 2)
2 0 0 0 0
Damage Profile (% wall)
penetration body ~?:>;~ metal loss body
0 50
1
11
21
Bottom of Survey = 28
100
Analysis Overview page 2
PDS CAL ER JOINT TABULATION
Pipe: 5 ins 15 ppf 13CR, STL Well:
Wall thickness. Body: 0.296ins Upset = 0.296ins Field:
Nominal ID: 4.408 ins Company:
Country:
Date:
E-24a
PRUDHOE BAY
BP EXPLORATION (ALASKA) INC.~8 penetration body
USA ~;~i ~ metal loss body
June 11, 2000
Joint Penetration Metal Projection Minimum Damage profile
No. Upset Body Loss Upset Body ID Comments % wall)
inches inches % % inches inches inches 0 50 ~0
1 0 .04 12 6 0 ,05 4,40 ~hallow pitting.
2 I 0 .01 3 2 0 .061 4.38 Lt. Deposits.
3 I 0 .00 2 0 .06 4.33 Lt, Deposits.
4 I 0 .02 6 2 0 .05 4.39
5 0 .01 2 1 0 0 4.39
6 0 .01 4 3 0 .06 4.39
7 0 .02 I 5 2 0 .06 4.37
8 0 .01 4 3 0 .07 4.37 Lt. Deposits.
9[0[ .02 ~2 0 .05 4.35
I [ [10 0- .02 8 2 0 .04 4.39
11 0 .03 c 1 0 .04 4.39
12 0 .01 2 ! 0 0 4.39
_13 0 .01 ___.2_ 2 0 ,06 4.35 Lt. Deposits.
14 0 .01 2 0 .04 4.36
15 0 .01 4 2 0 .04 4.36
16 ~0 .01 2 0 .04 4.36
17 0 .01 2 0 0 4.40
18 0 .01 2 0 0 4.37
19 0 .00 2 0 0 4.37
20 0 .01 2 0 0 4,40
21 0 .01 2 0 0 4.37
22 0 .01 3 0 0 4.37
23 0 .01 2 0 0 4.39
24 0 .04 12 2 0 -- 0 4.40 Shallow pitting.
25 0 .03 2 0 .04 4.32
26 0 .01 3 0 0 4.41
27 0 .00 3 0 0 4.38
28 0 .01 4 0 0 4.41 __
Damage Classifications
Penetration / projection class, in order of damage severity Hole - penetration exceeds 85% of nominal wall thickness
Ring - damage area exceeds 75% o{ circumference, but depth range does not exceed I * pipe ID
Line - damage depth range exceeds 5 * pipe ID, but extends [ess than 22% of circumference
General* damage depth range exceeds 1 * pipe ID and/or extends more than 22% of circumference
Isolated - damage depth range does not exceed 5 * pipe ID or extend more than 22% of circumference
Damage reporting threshold = 30 thou inches deviation in body, 50 thou in upset. Modal line length = 0.800 feet.
Pipe Tabulations page
PDS ._ALIPER JOINT TALLY SHEET
Pipe:5ins 15ppf 13CR, STL
Wall thickness. Body: 0.296ins Upset -- 0.296ins
Nominal ID: 4.408 ins
Joint Depth Length Measured Type
No. ID
feet feet inches
1 9411.92 43.40 4.447
2 9455.32 42.95 4.432
3 9498.2 7 43.06 4.444
4 9541.33 42.45 4.441
5 9583.78 i 42.92 4.440
6 9626.70 41.80 4.443
7 9668.50 42.18 4.441
8 9710.68 42.84 4.432
9 9753.52 43.31 4.442
10 9796.83 43.66 4.436
11 9840.49 42.93 4.442
12 9883.42 42.69 4.438
13 9926.11 42.62 4.444
14 9968.73 42.75 4.444
15 10011.48 43.15 4.448
16 10054.63 42.75 4.449
1 7 10097.38 42.56 4.442
18 10139.94 42.54 4.446
19 10182.48 43.86 4.449
20 10226.34 42.67 4.442
21 10269.01 42.91 4.451
22 10311.92 43.15 4.448
23 10355.07 43.37 4.439
24 10398.44 43.21 4.438
25 10441.65 44.41 4.443
26 10486.06 41.91 4.451
2 7 10527.97 39.85 4.438
28 10567.82 unknown 4.432
Well: E-24a
Field: PRUDHOE BAY
Company: BP EXPLORATION (ALASKA)INC.
Country: USA
Date: June 11, 2000
Joint Depth Length Measured Type
No. ID
feet feet inches
Joint Tally page 1
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 30 November 1994
Transmittal of Data
Sent by: MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
1 PLS FINAL BL + RF
1 CN/GR FINAL BL + RF
1 PFC/PERF FINAL BL+RF
1 PLS FINAL BL + RF
1 PLS FINAL BL + RF
1 CN/GR FINAL BL + RF
1 PFC/PERF FINAL BL+RF
1 GR/CCL TCP FNL BL+RF
1 GR/CCL PACKER FNL BL
1 GR/CCL PACKER FNL RF
1 PLS FINAL BL + RF
1 GR/CCL FINAL BL + RF
1 PLS FINAL BL'+ RF
Run # 1
Run # 1
Run # 1
Run ~ 1
Run # 1
Run # 1
Run ~ 1
Run # 1
Run ~ 1
Run # 1
ECC No.
1414.03
2568.03
2577.05
4014.02
4472.01
5809.05
6020.01
6307.00
Run # 1 6308.00
Run # 1 6309.00
Run # 1
Please sign and return to: Ati~Wireline Set'vices
560o
~ Rodney D. ~son
Received by ,~~ ~~ Date:
MEMORANDUM
State of Alaska
TO:
THRU:
David John~
Chairm~
Blair Wondzell,
P. I. Supervisor~..,~
FROM: Bobby Fost SUBJECT:
Petroleum Inspector
Alaska Oil and Gas Conservation Commission
DATE: November 9, 1994
FILE NO: AIGIKIBD.doc
BOPE Test- Doyon 14
BPX - PBU - E-23A
Prudhoe Bay Field
Wednesday, November 9, 1994: I traveled this date to BPX's PBU E pad and
witnessed the BOPE test on well E-24A being drilled by Doyon rig 14.
As the attached AOGCC BOPE Test Report shows there was 1 failure. The lower
kelly valve leaked. This was changed and tested OK.
The location was clean and all extra drilling equipment was stored properly. The rig
was clean and all equipment seemed to be in good working order.
Summary: I witnessed the BOPE test on Doyon RIG 14 - test time 2.5 hours - 1
failure.
Attachment: AIGIKIBD.XLS
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg:
Drlg Contractor:
Operator:
Well Name:
Casing Size: 7"
Test: Initial
X Workover:
DOYON Rig No. 14 PTD #
BPX Rep.:
E-24A Rig Rep.:
Set @ 9839' Location: Sec.
X Weekly Other
DATE: 11/9/94
g4-122 Rig Ph.# 659- 4510
JIM GAFFNEY
MARK"LA TCH" EGHOLM
8 T. 11N R. 14E Meridian U
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
Reserve Pit N/A
Well Sign OK
Drl. Rig OK
BOP STACK: Quan.
Annular Preventer 1
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve N~,
Test
Pressure P/F
500/3000 P
1 500~5000 P
1 500~5000 P
1 500~5000 P
3 500~5000 P
2 500~5000 P
3 500~5000 P
MUD SYSTEM: Visual Alarm
Trip Tank OK NO
Pit Level Indicators OK OK
Flow Indicator OK OK
Gas Detectors OK OK
FLOOR SAFETY VALVES:
Upper Kelly / IBOP
Lower Kelly/IBOP
Ball Type
Inside BOP
Quan.
1
1
1
1
Test
Pressure P/F
500~5000 P
500~5000 P
500~5000 P
500~5000 P
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
14
Test
Pressure P/F
500~5000 P
36 500~5000 P
1 P
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure 0
System Pressure Attained 2
Blind Switch Covers: Master:
Nitgn. Btl's: 4 ~ 2100
3,000 IP
1,400 P
minutes 36 sec.
minutes 17 sec.
YES Remote: YES
Psig.
Number of Failures: '/ ,Test Time: 2.5 Hours. Number of valves tested 26 Repair or Replacement of Failed
Equipment will be made within 0 days. Noti~ the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. i. Supervisor at 279-1433
REMARKS:
Failure: The lower kelly failed - replaced and tested OK
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c -Inspector
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
BOBBY D. FOSTER
FI-021L (Rev. 7/19) AIGIKIBD.XLS
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
THRU:
David J o h n__0.L~~,
C hai rrna'F.~,.-~
Blair Wondzel,, ~,~/,,/,~,~
P. I. Supervisor
FROM: Lou Grimaldi, ~'"',--~ SUBJECT:
Petroleum Inspector
DATE:
October 11, 1994
FILE NO: PHGJJKBD.DOC
Perforations Cement plug
BPX well # E-24
Prudhoe Bay Field
PTD # 940-122
Monday, October 10, 1994: I traveled to BPX E pad to witness the verification of
placement of the cement plug at the perforations in well # 24.
When I arrived the rig was just tripping in the hole and was running late due to problems
setting the 9 5/8 packoff. I was informed it would be approximately 0200 hours to bottom.
Tuesday, October 11, 1994: At 0230 hrs the rig tagged cement at 9573' RKB the mud
motor was started and they milled down to 9587' RKB where the cement seemed alot
firmer. The motor was stopped and 15000 K was set down with out the appearance of
settling in. When the string was picked up it was smooth giving all indications of a solid,
setup cement plug. The rig then prepared to drill down to the window that had been
previously cut at 9839' RKB.
SUMMARY: I witnessed the verification of placement of the cement plug at the
perforations in BPX well #E-24 in the Prudhoe Bay field.
Attachments: PHGJJKBD.XLS
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Plug And Abandonment Report
Operator: BPX
Operator Rep.: Dink Heim
Lease No.:
Well No.:
Total Depth:
Well Name: E-24
PTD No.: 94-122
Sec. T-R 6,11N, 14E
Elevation:
Date: 10/11/94
Meridian:
32 Mud Wt.: ppg.
CASING DATA:
Drive Pipe: O.D." Set @: ft. With Penetration
Conductor: O.D." Set @: ft. Surface: O.D." Set @:
Intermediate: O.D." Set @: ft. Prodctn: O.D." Set @:
PLUGGING DATA:
1. Open Hole Plugs:
2. Open Hole Isolation Plugs:
3. Perforation Plugs: Tag Cement at 9573',mill to 9587' set 15000 K down. Drill to top of window at 9839.
Top of perfs at 10,520 (ELM)
4. Annulus Plugs:
5. Casing Stub Plugs:
6. Surface Plug:
Casing Removal:
REMARKS:
" Casing Cut @ Feet
" Casing Cut @ Feet
" Casing Cut @ Feet
" Casing Cut @ Feet
Distribution:
odg - Well File
c - Operator
c - DNR/DOG
c- Database
c - Rpt File
c- Inspector
Inspector (s): Louis R Grimaldi
Fl-000 (Rev. 3~93) PHGJJKBD.XLS
ALASKA OIL AND GAS
CONSERVATION COMMISSION
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
September 20, 1994
A C Clark, Drlg Engr Supv
BP Exploration (Alaska)Inc
P O Box 196612
Anchorage, AK 99519-6612
Re:
Well #
Company
Permit #
Surf Loc
Btmhole Loc
Prudhoe Bay Unit E-24A
BP Exploration (Alaska) Inc
94-122
1786'SNL, 501'WEL, Sec6, T11N, R14E, UM
2564'SNL, 1420'WEL, Sec 7, T11N, R14E, UM
Dear Mr Clark:
Enclosed is the approved application for permit to re-drill the above referenced well.
The permit to re-drill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting re-drilling operations
until all other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordadnce with 20 AAC 25.035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling a new hole. Notice may be given
by contacting the Commission's petroleum field inspector on the North Slope pager at 659-3607.
Chairman ~ ,
BY ORDER OF THE COMMISSION
jo/encl
c: Dept of Fish & Game, Habitat Section - w/o encl
Dept of Environmental Conservation - w/o encl
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
2O AAC 25.005
la.. Type of work Drill [] RedrillEIIlb. Type of well. Exploratory[] Stratigraphic Test [] Development Oil []
Re-Entry [] DeepenFII Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration 64.68 feet Prudhoe Bay Field/Prudhoe
3. Address 16. Property Designation Bay Pool
P. 0. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28304
4. Location of well at surface 17. Unit or property Name 11. Type Bond(me 20 ,~c 25.025)
1786'SNL, 501' WEL, SEC. 6, T11N, R14E Prudhoe Bay Unit
At top of productive interval !8. Well number Number
1694'SNL, 1552' WEL, SEC. 7, T11N, R14E E-24A (32-7-11-14) 2S100302630-277
At total depth 9. Approximate spud date Amount
2564' SNL, 1420' WEL, SEC. 7, T11N, R14E 10/2/94 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(MDa, dTVD)
property line
ADL 28305-2716' feet No close approach feet 2560 12201'MD/8931' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (me 20 A^C 25.035 (e)(2))
Kickoff depth ~s,~6 feet Maximum hole angle ~ o Maximum surface 3330 pslg At total depth (TVD) ~800'/4390
18. Casing program Specifications Setting Depth
size Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length M D TVD MD TVD (include stage data)
6" 5" 15# 13CR8O STL 2750' 9450' 8000' 12201' 8931' 230 sx Class "G"
I'~L~LI V CL./
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary S EP '1,5 1994
Total depth: measured 10735 feet Plugs (measured) Ai~ska 0il & Gas Cons. gommission
true vertical 9047 feet Anchorage
Effective depth: measured 10692 feet dunk (measured)
true vertical 9017 feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor 20" 8 cu yds Concrete 110' 110'
Surface 2635' 13-3/8" 3723 cu ft PF 2673' 2673'
Intermediate 9781' 9-5/8" 2073 cu ft "G" 9816' 8367'
Production
Liner 1167' 7" 400 cu ft "G" 10735' 9047'
Perforation depth: measured 10542'-10552'(Squeezed) 10560'-10612", 10618'-10632', 10538'-10552', 10520'-10538'(Open)
true vertical 8844'-8852' (Squeezed)8857'-8894', 8898'-8908't 8841'-8852'~ 8826'-8841'(Open)
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drillin~ fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[]
21. I hereby certify th~."t .the/for, e9oin§/is true and correct to the best of my knowledge
Si~lned ~,/' ~' '/~L~,._~7~ Title Drillin~ En~ineerSupervisor Date
' Commission Use Only '
Permit Number IAPI number IApp~val date See cover letter
~ ~" -/..2_ 2-. 15 0- O 2_ ~- - .2./.-~' ~ -" ~ / I 4f~'" ~'' O '- ~,,c/ for other requirements
Conditions 'of approval Samples required [] Yes ,;~ No Mud Icg required []Yes [~ No
Hydrogen sulfide measures [] Yes ~ No Directional survey requlreo ~ Yes [] NO
Required working pressure for BOPE [] 2M; [-13M; ~hM; t-I10M; F"I15M;
Other: Original Signed By
by order of
Approved by r)avid W. Johnston Commissioner [ne commission Date.2/"Z~./.?~
Form 10,401 Rev. 12-1-85 Submit in tril
I Well Name: I E-24A
IType of Redrill (producer or
injector)-
Redrill Plan Summary
PRODL~ER
Surface 1785.76 FNL 500.31 FEL SEC6 TWNSHP 11N RANGE 14E
Location:
Target Location: 1694.42 FNL 1551.91 FEL SEC7 TWNSHP 11N RANGE 14E
Bottom Hole 2563.7 FNL 1419.52 FEL SEC 7 TWNSHP 11N RANGE 14E
Location:
AFE
Number:
4P8011
Estimated Start 02OCT94
Date:
IUD.- 112,201'
IRig: I
IOperating days to
complete-
ITv[): 18931 I
DOYON RIG #14
17
I KBE:
64.68 J
Well Design (conventional,
slimhole, etc.;):
HORIZONTAL SIDETRACK
Objecti
ve'
SADLEROCHIT
Mud Program:
A 9.5 - 10.00 ppg Biozan polymer/KCI water based mud will be used.
Special A non-damaging xanvis polymer mud at 8.6-9.0 ppg is
design planned to be used to drill the 6" hole interval however
consideration a waterbased system may be substituted for the
s polymer system.
Depth Densi PV YP INT 10MIN FL OIL SOLID
(TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S
(PPG) ) min (%)
KOP' 9.5 10 15 5 10 10 0 5
to to to to to to to to to
TD' 10.0 18 30 15 30 5 0 10
RECEIVED
Directional:
[KOP: [9,846' md
SEP 1 5 1994
Alaska 0il & Gas Cons. Commission
Anchorage
E-24A Redrill Plan Summary Page 1
Maximum Hole
.Angle:
Close Approach
Well:
91°
The above listed wells will be secured during the close approach.
Casin ]/Tubing Proqram:
Hole Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbcj O.D. MD/TVD MD/TVD
6" 5" 15# 13CR-80 STL 2,750 9450/8000 12201/8931
N/A 4-1/2 12.6 L-80 TDS 9450 SURFACE 9450/8000
Cement Calculations:
Liner
Size-
5", 15#, 13CR-80, STL
50% open hole excess, 80' shoe joint, 279' liner lap (7"), 117' lap in
9-5/8", and 100' excess above liner with 5" DP.
Total Cement 48 bbl 230 sxs of Class G Blend @ 1.17 ft3/sx
Volume:
Liner N/A
Size:
sB..asi 1 50% open hole excess, 40' shoe joint, 150' liner lap and 150' excess
above liner with DP.
Total CementVolume: I ~/^l
sxs of Class G Blend @ 1.18 ft3/sx
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and
annular preventer will be installed and is capable of handling maximum
potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
SEP '~ 5 't994
~s~,~ Oi~ & Gas Cons. Commission
Anchor~
E-24A Redrill Plan Summary Page 2
SUMMARY PROCEDURE
I ,
.
3.
4.
5.
6.
7.
.
.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Pre-rig work. Displace well to seawater. Freeze protect tubing and annulus to 2200' md
and set a BPV.
Move in drilling rig.
Pull BPV. Circulate diesel freeze protection cap from well and recover for future use.
Install a BPV and tree test plug. Remove the production tree.
Install BOP's and test to 5000 psi. Remove the test plug and BPV.
Shear SBR. Pull and lay down the 5-1/2" x 4-1/2" tubing.
Displace well to milling fluid. Cut a 50' section in the 7" casing starting from about
_+9.846'MD.
RIH with 1,300' OF 2-7/8", 8.7#, L-80, DSS-HTC tubing to PBTD at 10,652' md. Spot a
47 bbl balanced cement plug to abandon perforations as well as serve as a kickoff plug. Pull
out of hole to just inside top of liner. Squeeze away 10 bbl of cement. Reverse circulate out
any cement.
Run in with an 4-3/4" steerable drilling assembly and a 6" bit with gamma ray/directional
MWD and dress the cement to 5' below the section top. Kickoff and displace well to FLO-PRO
system. Continue to directionally drill to TD at +_12,201' md which should yield ___880' of
horizontal section (see attached directional plan).
Make a conditioning trip with a 6" hole-opener for the open hole section and with a 9-5/8"
casing scraper spaced to clean the casing.
Install a 5". 15". L-80 or 13CR-~0 . STL SOLID liner with 5" X 9-5/8" packer/hanger.
Space packer / hanger to be set at +_9,425' md.
Cement the liner in place with the total cement volume based upon 50 % open-hole
enlargement plus the 80' shoe volume, 150' lap volume and 150' excess on top of the liner
with drillpipe in the hole.
Re-test BOP's as needed.
PU 3-1/8" BHA. RIH and cleanout liner. Displace well to seawater.
RIH with drillpipe conveyed perforating assembly and perforate the well. POOH LDDP.
Run the 4-1/2" L-80 completion string assembly re-using as much of the 4-1/2" tubing
and jewelry that was pulled from the well. Space out and circulate with corrosion inhibitor.
Install a BPV and test plug. Remove BOP's.
Install and test the production tree to 5000 psi. Pull tree test plug and BPV.
Set packer.
Test the tubing x casing annulus to 3500 psi for 30 minutes.
Shear RP valve in the upper GLM and freeze protect the well.
Set a BPV. Release rig.
Complete appropriate documentation and hand-over to Production.
REEEIVED
SEP 1 5 1994
Alaska 0ii & Gas Cons. Commission
Anchora,,~,
E-24A Redrill Plan Summary Page 3
Prudhoe Bay Drilling
Prudhoe Bay Unit f-'
E-PAD
E-24A Wp7 (Medium
Radius)
CRITICAL POINT DATA
MD Inc Azl.
KDP / TIE IN / 9846 38.6R' 804.83'
START DF
CURVE 8
4.00'/100 F~
~HUBLIK 9879 38.71' 808,13'
TSAD - IVISHAK 9956 39.07' 197.85'
TVD N/S
8391 396E S 1053 W
8417 3981 ~ 1061 W
8477 40E7 S 1077 W
/ ZONE 4 - 48
END DF CURVE 10074 40.00' 190.00' 8567 4100 ~ 1095
ZONE 3 10118 40.00' 190.00' 860~ 41~8 S llOO
ZONE E - EC 10803 40.00' 190,00' 8667 4188 ~ 1109
START DF 10384 40,00' 190.00' 8759 4E58 S llE3
CURVE R
11.00'/100 F~
RGDC 10515 59.73' 180.39' 8888 4408 S 1134
ZONE 1 - 13 10594 68.18' 177.57' 8917 4474 S 1133
END DF CURVE 10810 90.99' 171,14' 8955 4683 S 1111
S~n~ horz, l13E1 90.99' 171.14' 8947 5188 S 1033
jTCnDet Name TVD NS EW Gpld X Gnld Y
S%mn% honz. 8947 5188 ~ 1033 V 663567 5970069
End honz. 8987 G066 S 998 W 663687 5969192
Tcrge~ polygon Bgb-~ 5188 S I033 W 663567 5970069
SCALE 200 ff./DIYIS/ON
TTD REF: ~zmm~D
TKt~i/CAL SECTION P, KF: ]F~T.I~rRAD
8/29/94 B 133 bm
HALL I BURTON
Eomzo~ ~ (~u~
BC~d~E ~00 fL/ DrvISION
~7. 20
OE . l~O'nn. ~ 10046 HD
8667 . 190.00. ~ 118 HD
e 10203 HD
873B . ZBO, O0. 8 10~84 HO
8829 - 184.27' E 10424 ~
8BB6 - lBO.OS' B 10524 MD
8987 - 176.63' 8 [0624 MD
8950 - ~7~.6~' ~ %0784 MD
89b-5 - t7%.%~' ~ IOBLO MD
~947 - %71..i4' ~ t%3~t gg
I I I I
1600 14OO laDD fOOD 600
800
iL4' ~ 1EEO1 ~D
3800
-~4000
----4800
-----4400
-~4&O0
-~4800
----5000
---5800
.---5400
--5600
~BO0
.~ooo
----&EO0
6400
400
RECEIVED
-- -4074-- ~38.6E' ~ 9846 HJ] KDP / TIE IN / ST~T DF CURVE R 4,00'/100 f~
-- --4094-----~%38.7[' ~ 9879 MD ~HUBLIK
--- 4t4~---~9.0~- . 99~ MD ~ - ~r~ ~ z~:4 - ~ SEP 1 5 1994.
.... 4~t6 .... ~ 40.00' E 10074 MD ~ OF ~VE -
.-- ~a~ .... ~4o.o~', ~o~ ~ m~ 3 AiaS~ OiJ & Gas Cons. Co~mJssion
.... 1376 ...... ~0.00' E 10384 ~ XTART DF ~R~ E 11.00'/100 f~
~30.83' E 10484 MD '
...... ~ ....... ~6B.1B' E 10~4 ~ ~ I - l~
3800 4000 4200 4400 4600 4800 5000 b-~O0 5400 5600 5800 6000 6EOO 6400
Y'~RT[CkI SECTION' PI~X'~: 188.4-2
-WELLPLAN FEASIBILITY' STUDY
This plan is for feasibility purposes only,
it has not yet been certified.
STATE OF ALASKA ' ~
A. ,KA OIL AND GAS CONSERVATION COMMI5 N
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon X Suspend __ Operation Shutdown__ Re-enter suspended well__
Alter casing __ Repair well __ Plugging X Time extension __ Stimulate __
Chan. ge approved program __ Pull tubing__ Variance__ Perforate __ Other X
__ Plugback for redrlll
At effective depth
At total depth
1037'SNL, 1735'WEL, SEC. 7, T11N, R14E
2. Name of Operator 5. Type of Well: 6.
BP Exploration Development x
Exploratory __
3. Address Stratigraphic __ 7,
P. O. Box 196612, Anchorage, Alaska 99519-6612 Service__
4. Location of well at surface 8.
At top of productive interval ~ g.
530'SNL, 1581'WEL, SEC. 7, TllN, R14E _~ ~
SE 10.
Atas~ 0il & Gas Cons. Commission 11.
/~ch0r~e
12. Present well condition summary
Total depth: measured
true vertical
10735 feet
9047 feet
Plugs (measured)
Datum elevation (DF or KB)
KBE = 67.48' feet
Unit or Property name
Prudhoe Bay Unit
Well number
E-24 (31-7-11-14)
Permit number
87-122
APl number
50- 029-21769
Field/Pool
Prudhoe Bay Field/Oil Pool
Effective depth: measured
true vertical
10692 feet Junk (measured)
9017 feet
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
.Length Size Cemented Measured depth True vertical depth
20" 8 cu yds concrete 110' 110'
2635' 13-3/8" 3723 cu ft Permafrost 2673' 2673'
9781' 9-5/8" 2073 cuft Class "G" 9816' 8367'
1167' 7" 400 cu ft Class "G" 10735' 9047'
measured 10542'- 10552' (Squeezed) 10560'- 10612', 10618'- 10632', 10538'- 10552', 10520'- 10538' (Open)
true vertical 8844'-8852' (Squeezed)8857'-8894', 8898'-8908', 8841 '-8852', 8826'-8841' (Open)
Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 tubing to 2511'MD; 4-1/2", 12.6#, L-80 tubing to 9602'MD
Packers and SSSV (type and measured depth) 9-5/8" TIW "HBB" packer @ 9497' MD; 5-1/2" Otis "RQM" SSSV @ 2056' MD
13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch
14. Estimated date for commencing operation
9/18/94
16. If proposal was verbally approved
Name of approVer
Date approved
15. Status of well classification as:
Oil x Gas
Suspended __
Service
17. I hereby certify that !~e foregoing is true and correct to the best of my knowledge.
Signed -// / ~. ~( L~."'-7~ Title Drilling EngineerSupervisor
FOR COMMISSION US~E ONLY
Conditions of approval: Notify Commission so representative may wit.~nes~.il
Plug integrity BOP Test __ Location cl~'-~e ~
Mechanical Integrity Test Subseo~ent ~re'~ed 10~
Approved by order of the Commission
Commissioner Date
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
WELL PERMIT CHECKLIST
WELL NAME
GEOL AREA
UNIT#
PROGRAM: exp []
dev [] redrll~
ON/OFF SHORE
serv []
ADMINISTRATION
ENGINEERING
1. Permit fee attached ..................
2. Lease number appropriate ...............
3. Unique well name and number ..............
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundary.
6. Well located proper distance from other wells .....
'7. Sufficient acreage available in drilling unit .....
8. If deviated, is wellbore plat included ........
9. Operator only affected party ..............
10. Operator has appropriate bond in force .........
11. Permit can be issued without conservation order ....
12. Permit can be issued without administrative approval.
13. Can permit be approved before 15-day wait .......
APPR
14. Conductor string provided ................ Y N
15. Surface casing protects all known USDWs ......... Y N
16. CMT vol adequate to circulate on conductor & surf csg.. Y N
17. CMT vol adequate to tie-in long string to surf csg . .'.~ N
18. CMT will cover all known productive horizons ...... N
19. Casing designs adequate for C, T, B & permafrost .... N
20. Adequate tankage or reserve pit ............. N
21. If a re-drill, has a 10-403 for abndnmnt been approved..~ N
22. Adequate wellbore separation proposed ..........
N
23. If diverter required, is it adequate ...........
24. Drilling fluid program schematic & equip list adequate ~_~ N
25. BOPEs adequate ............. i~ N
26. BOPE press rating adequate; test to ~"'~'~'~'~ ;~}~~/ N
27. Choke manifold complies w/API RP-53 (May 84) .......
28. Work will occur without operation shutdown ....... ~ N
29.
Is presence of H2S gas probable ............. Y ~
GEOLOGY
APPR
30. Permit can be issued w/o hydrogen sulfide measures .... Y N/
31. Data presented on potential overpressure zones ..... Y /N /g
32. Seismic analysis 9f shallow gas zones .......... ~/ i ~t~,
33. Seabed condition survey (if off-shore) ........ JY N
34. Contact name/phone for weekly progress reports .... /. Y N
[exploratory only]
GEOLOGY: ENGINEERING: COMMISSION:
Comments/Instructions:
HOW/jo - A:~ORMS~heklist rev 0.3/94
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX. ,
No special effort has been made to chronologically
organize this category of information.
E - 24A
RECEIVED
FEB 8 1995
PRUDHOE B
,AY:a o,, & Gas Cons. Comm'ssion
Anchorage
H C.. E D
Run 1'
14 - January - 1995
PDK-100/GR
Cased Hole
1O6OO
1213O
Atlas Wireline Services
Tape Subf~le 2'is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
E - 24A
500292176901
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
31-JAN-95
6309.01
K. BRUNNER
K. SMITH
6
liN
14E
1786
501
65.65
64.13
30.10
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING
2ND STRING 9.625 9816.0
3RD STRING 5.000 12240.0
PRODUCTION STRING 4.500 9405.0
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
MWD
GR
1
1
Il-NOV-94
SPERRY SUN DRILLING SERVICES
BASELINE DEPTH
10830.0
10842.5
10893.0
10898.5
10902.0
10903.0
10903.5
10925.5
10949.0
10981.0
10982.0
10994.5
10999.5
GRCH
10830.0
10844.5
10895.0
10900.5
10904.5
10905.0
10905.5
10927.0
10949.5
10982.5
10983.0
10996.0
11001.0
EQUIVALENT UNSHIFTED DEPTH
47.00
15.00
12.60
11000.0
11052.5
11053.5
11068.5
11069.5
11073.0
11078.0
11085.0
11086.0
11086.5
11087.5
11093.5
11094.0
11094.5
11095.5
11107.0
11108.0
11137.0
11138.0
11143.5
11144.5
11145.5
11148.5
11149.5
11150.0
11150.5
11195.0
11209.0
11215.0
11228.0
11234.0
11240.5
11277.5
11287.0
11331.5
11338.0
11349.5
11357.5
11367.5
11386.5
11397.0
11398.0
11398.5
11402.5
11403.5
11415.0
11415.5
11416.0
11423 · 0
11424.0
11430.0
11445.5
11544.5
11554.5
11558.0
11581.5
11590.0
11604.5
11671.0
11734.0
11002.0
11054.5
11055.0
11070.0
11070.5
11074.0
11080.5
11087.5
11088.0
11088.5
11089.0
11095.0
11096.0
11096.5
11097.0
11108.5
11109.0
11138.5
11139.5
11146.5
11147.5
11148.0
11151.0
11151.5
11152.0
11153.0
11196.5
11210.5
11216.5
11230.5
11236.0
11243.0
11279.5
11289.0
11330.0
11337.0
11351.5
11360.5
11369.5
11390.0
11400.0
11401.5
11402.5
11406.5
11407.0
11418.5
11419.0
11419.5
11426.5
11428.5
11434.0
11449.0
11544.5
11555.0
11558.5
11580.5
11589.0
11603.5
11670.5
11732.0
11735.0'
11744.0
11757.5
11801.5
11872.5
11888.0
11925.0
11926.0
11927.5
11940.0
11940.5
11962.0
11983.5
12034.0
12062.0
12090.0
$
REMARKS:
11732.5
11741.5
11758.5
11801.5
11872.5
11888.5
11929.0
11930.0
11930.5
11943.0
11944.0
11965.5
11989.0
12036.0
12064.5
12090.0
PDK-100/GR Log.
LOG TIED INTO SPERRY SUN MWD.
THIS IS A HORIZONTAL HOLE AND WAS LOGGED WITH
COILED TUBING.
******************** NOTE *********************
,
* DATA DEPTH MATCHED TO MWD RUN 11-NOV-94 PER *
* BP'S REQUEST. MWD IS THE DEPTH REFERENCE *
* FOR THIS WELL. *
, ,
******************** NOTE *********************
PRODUCTION RATES (06-JAN-95):
ELAPSED TIME = 12.0 HOURS
GROSS FLUID RATE = 1.34 MBPB
NET OIL RATE = 1.29 MBOPD
NET WATER RATE = 0.05 MBWPD
FORMATION GAS RATE = 6.34 MMSCFD
GOR
LIFT GAS RATE
CASING PRESSURE
TGOR
TGLR
CHOKE OPENING
WATER CUT
= 4900 SCF/STB
= 0.0 MMSCFD
= 1217 PSIG
= 6472 SCF/STB
= 6247 SCF/BBL
= 95.6
= 3.5 %
LOGGING PROGRAM ORGANIZATION:
1. LOGGED FLOWING PASS.
2. LOGGED BASE WATER PASS.
3. LOGGED 20 BBLS BORAX AWAY PASS.
4. LOGGED 44 BBLS BORAX AWAY PASS.
5. LOGGED 100 BBLS BORAX AWAY PASS.
A DIFFUSION CORRECTED SGMA CURVE IS INCLUDED FOR THE
FLOWING AND BASE WATER PASSES. THE CURVE IS NAMED
SGNT AND WAS CORRECTED WITH THE FOLLOWING PARAMETERS:
FLOWING PASS
BOREHOLE SIZE = 8"
CASING SIZE = 5.5"
SALINITY = 0 PPM
BASE WATER PASS
BOREHOLE SIZE = 8"
CASING SIZE = 5.5"
SALINITY = 25,000 PPM
A PDK POROSITY CURVE (PHI) WAS ALSO CREATED FOR THE
BASE WATER PASS.
SHIFT PROCEDURE AS FOLLOWS:
1. FIRST PASS GAMMA RAY DEPTH MATCHED TO PREVIOUS
OPEN HOLE GAMMA RAY.
2. FIRST PASS SGMA DEPTH MATCHED TO "SHIFTED" FIRST
PASS GAMMA RAY.
3. ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS GAMMA RAY.
4. ALL SUBSEQUENT SGMA (PDK) PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS SGMA.
/ ? ?MATCH1A. OUT
$
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves
PASS NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GRCH 10833.0
PDK 10845.0
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
BASELINE DEPTH SGMA
10830.0 10830.0
10857.5 10857.5
10908.0 10909.0
10946.0 10946.0
11002.5 11000.5
11051.0 11050.5
11079.5 11081.0
11098.5 11099.0
11099.0 11100.0
11106.0 11107.0
11106.5 11108.5
11194.5 11196.5
11232.5 11234.5
11274.0 11276.0
11287.0 11289.0
11331.5 11330.5
11338.5 11338.0
11357.0 11360.5
11374.0 11377.5
11545.5 11545.0
11565.5 11568.0
11592.5 11592.5
11658.5 11662.0
11756.0 11756.0
11818.0 11820.0
11872.5 11875.0
11934.0 11936.5
11991.5 11988.5
11992.0 11989.0
11992.5 11990.0
11995.0 11992.5
11996.0 11993.0
12012.0 12012.5
12014.5 12015.0
12034.0 12036.5
12038.5 12041.0
12066.5 12068.0
12067.0 12068.5
12068.0 12069.0
for each pass in separate files.
STOP DEPTH
12074.0
12086.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
12068.5
12069.0
12070.5
12071.5
12072.0
12073.0
12074.0
12074.5
12090.0
$
REMARKS:
12069.5
12070.5
12072.0
12072.5
12073.0
12073.5
12074.5
12075.0
12090.0
FLOWING PASS.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY.
/ ??MATCH1B . OUT
$
CN : BP EXPLORATION
WN : E - 24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
15 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH PDK 68 1 GAPI
2 BIF PDK 68 1
3 BKL PDK 68 1 CPS
4 BKS PDK 68 1 CPS
5 CSLS PDK 68 1 CU
6 LS PDK 68 1 CPS
7 MSD PDK 68 1 CU
8 RATO PDK 68 1
9 RBOR PDK 68 1
10 RICS PDK 68 1
11 RIN PDK 68 1
12 SGMA PDK 68 1 CU
13 SGMB PDK 68 1 CU
14 SS PDK 68 1 CPS
15 SGNT PDK 68 1 CU
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
60
* DATA RECORD (TYPE# 0) 966 BYTES *
Total Data Records: 169
Tape 'File~Start Depth = 10830.000000
Tape File End Depth = 12090.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
40337 datums
Tape Subfile: 2
459 records...
Minimum record length:
Maximum record length:
62 bytes
966 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
START DEPTH
10690.0
10702.0
BASELINE DEPTH GRCH
10685.0 10687.5
10731.0
10741.5
10760.5
10789.0
10812.5
10825.5
10839.0 10840.5
10845.0
10866.0
10875.0 10877.0
10897.5 10899.0
10898.0
10899.0 10900.5
10903.0 10905.0
10905.0 10907.0
10908.0
10912.5
10913.5
10914.5
10920.5
10921.5
10928.5
10929.5
10940.5 10940.5
10947.0 10947.0
10947.5 10948.0
10950.0
10951.0
10954.0 10954.5
10955.0
10981.0 10982.0
10998.0 10998.0
11045.5 11047.5
11049.5
11050.0 11052.0
11051.0 11052.5
STOP DEPTH
12115.0
12127.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
SGMA
10685.5
10733.5
10743.5
10761.5
10788.0
10810.5
10824.0
10843.0
10867.5
10899.5
10908.5
10913.5
10914.5
10915.0
10921.0
10921.5
10928.5
10929.0
10949.5
10950.0
10954.0
11049.5
11050.0
11050.5
11053.0
11054.0
11064.0
11069.5
11071.5
11077.0
11079.0
11080.0
11083.0
11083.5
11094.5
11095.0
11095.5
11101.0
11101.5
11105.5
11106.0
11106.5
11116.0
11117.0
11128.5
11129.0
11142.5
11176.0
11192.0
11193.5
11194.0
11194.5
11196.0
11201.0
11201.5
11203.5
11204.5
11205.5
11206.0
11211.0
11218.0
11226.0
11228.0
11240.5
11241.5
11268.0
11271.5
11272.5
11274.5
11283.5
11285.5
11286.0
11286.5
11287.5
11321.5
11323.0
11324.0
11338.5
11345.0
11346.0
11346.5
11347.0
11350.5
11355.5
11054.5
11055.0
11064.5
11072.5
11080.0
11082.0
11082.5
11086.0
11095.5
11096.0
11097.0
11108.0
11143.5
11178.0
11219.5
11230.0
11242.5
11276.5
11285.0
11287.5
11322.0
11322.5
11337.0
11345.0
11071.0
11083.5
11101.5
11102.5
11106.5
11107.5
11118.5
11119.5
11130.0
11130.5
11194.5
11196.0
11197.0
11197.5
11198.0
11203.0
11204.0
11206.0
11206.5
11207.5
11208.5
11213.5
11228.0
11243.5
11270.5
11274.0
11274.5
11287.5
11288.0
11288.5
11289.5
11321.0
11322.5
11323.0
11337.5
11347.5
11348.0
11349.0
11352.5
11358.5
11356.5 11359.5
11362.0 11365.0
11362.5 11366.0
11367.5 11369.0
11379.0 11382.5
11381.0 11383.5
11404.5 11407.0
11405.5 11407.0
11417.0 11420.0
11430.0 11433.0
11430.5 11432.5
11434.0 11436.0
11435.0 11436.5
11435.5 11437.5
11441.5 11443.5
11442.5 11444.0
11446.5 11448.0
11453.5 11454.5
11456.5 11457.5
11457.5 11458.0
11458.0 11458.5
11464.0 11465.0
11467.0 11468.0
11468.0 11468.5
11496.0 11496.5
11508.5 11509.5
11512.5 11513.5
11513.5 11514.0
11536.0 11536.0
11536.5 11535.5
11539.0 11538.0
11539.5 11539.0
11545.5 11546.0
11548.5 11548.5
11549.0 11549.5
11550.0 11549.5
11552.0 11552.5
11552.5 11553.0 11553.0
11553.0 11554.0 11554.0
11553.5 11555.0
11554.0 11555.0
11554.5 11556.0
11555.0 11556.5
11555.5 11557.5
11559.0 11560.5
11572.5 11574.5
11573.5 11575.0
11578.0 11577.0
11581.5 11583.0
11582.5 11583.5
11588.5 11589.5
11589.5 11590.0
11590.0 11590.5
11590.5 11591.5
11591.5 11590.5
11592.0 11591.5
11593.0 11592.5
11594.0 11593.0
11596.5 11595.5
11597.0 11596.5
11602.0
11603.0
11604.0
11609.0
11621.5
11622.0
11625.0
11629.0
11634.0
11634.5
11635.0
11638.5
11642.5
11643.5
11644.0
11644.5
11645.5
11647.5
11648.0
11648.5
11651.0
11652.5
11657.0
11657.5
11661.5
11662.0
11663.5
11664.0
11671.5
11673.0
11728.5
11739.5
11740.0
11740.5
11750.5
11751.0
11751.5
11752.5
11753.0
11762.5
11764.0
11764.5
11772.5
11773.5
11774.0
11780.5
11785.5
11786.0
11788.0
11789.0
11789.5
11790.0
11790.5
11791.5
11793.5
11794.0
11798.0
11798.5
11799.0
11802.5
11656.5
11657.5
11673.0
11739.5
11740.5
11741.0
11752.5
11764.0
11780.0
11802.0
11603.0
11603.5
11604.5
11610.0
11622.5
11623.5
11626.5
11631.0
11636.0
11637.0
11638.0
11641.5
11647.0
11648.0
11649.0
11649.5
11650.0
11652.0
11652.5
11653.0
11655.5
11656.0
11665.0
11666.0
11667.5
11668.5
11676.0
11729.5
11751.5
11752.0
11753.0
11754.0
11765.0
11766.0
11774.0
11775.5
11776.0
11785.5
11786.5
11788.5
11789.0
11789.5
11790.5
11791.0
11791.5
11793.5
11794.5
11798.5
11800.5
11801.5
11807.0
11807.5
11808.0
11814.5
11816.5
11817.5
11820.5
11821.0
11823.0
11855.5
11871.5
11872.5
11900.0
11924.5
11925.0
11926.0
11927.0
11934.0
11940.0
11940.5
11941.0
1194'2.0
11946.0
11948.0
11949.0
11950.5
11957.5
11958.5
11961.5
11968.0
11970.0
11975.5
11977.5
11978.5
11981.0
11986.0
11987.0
11988.5
12028.5
12055.0
12062.5
12107.5
12126.5
12130.0
$
REMARKS:
11807.0
11807.5
11810.0
11816.5
11818.5
11819.0
11819.5
11820.5
11822.5
11856.0
11874.0
11874.0
11901.5
11929.0
11929.5
11930.0
11930.5
11937.5
11943.5
11944.5
11944.0
11944.5
11950.0
11950.5
11951.0
11952.5
11958.0
11958.5
11966.0
11972.5
11970.0
11981.5
11983.5
11984.5
11980.0
11985.0
11985.5
11987.0
12031.0
12059.5
12065.5
12109.5
12130.0
12130.0
BASE WATER PASS.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
CN
WN
FN
COUN
STAT
/ ? ?MATCH2A. OUT
/??MATCH2B. OUT
$
: BP EXPLORATION
: E - 24A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
16 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH PDK 68 1 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CSLS PDK 68 1 CU 4
6 LS PDK 68 1 CPS 4
7 MSD PDK 68 1 CU 4
8 RATO PDK 68 1 4
9 RBOR PDK 68 1 4
10 RICS PDK 68 1 4
11 RIN PDK 68 1 4
12 SGMA PDK 68 1 CU 4
13 SGMB PDK 68 1 CU 4
14 SS PDK 68 1 CPS 4
15 SGNT PDK 68 1 CU 4
16 PHI PDK 68 1 PU-S 4
GAPI 4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
64
* DATA RECORD (TYPE# 0) 958 BYTES *
Total Data Records: 207
Tape File Start Depth = 10685.000000
Tape File End Depth = 12130.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 49148 datums
Tape Subfile: 3 502 records...
Minimum record length: 62 bytes
Maximum record length: 958 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
START DEPTH
10688.0
10700.0
STOP DEPTH
11078.0
11090.0
(MEASURED DEPTH)
......... EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH GRCH
10698.5 10701.0
10703.5 10706.0
10704.5 10706.5
10706.0
10706.5 10708.5
10713.5 10714.5
10715.5 10716.5
10716.0 10719.5
10718.0 10721.5
10723.0 10725.5
10724.0 10726.5
10725.0 10727.0
10731.0
10749.0
10758.5 10760.5
10759.5 10761.0
10760.5
10765.0
10766.0
10769.0 10770.5
10769.5 10771.5
10770.5 10772.5
10771.5 10773.0
10774.5
10775.5
10781.0 10782.5
10782.0 10783.0
10782.5 10783.5
10786.5
10787.5
10788.0 10789.5
10792.5 10794.0
10793.5 10794.5
10794.5 10796.5
10796.5
10797.5
10798.5
SGMA
10707.5
10734.0
10751.0
10761.0
10761.5
10766.0
10766.5
10771.0
10771.5
10774.5
10775.0
10786.0
10786.5
10795.5
10796.0
10796.5
10800.0
10800.5
10801.0
10802.0
10803.0
10809.0
10809.5
10814.0
10819.0
10820.0
10822.5
10837.5
10879.5
10884.5
10893.0
10899.0
10905.0
10905.5
10906.5
10907.0
10908.0
10915.5
10916.0
10917.5
10918.5
10924.5
10925.5
10937.0
10938.0
10938.5
10939.0
10940.0
10940.5
10941.0
10942.0
10945.5
10949.5
10950.5
10951.0
10952.0
10952.5
10996.5
11002.5
11051.0
11053.0
11053.5
11054.5
11066.0
11066.5
11067.5
11069.0
11079.0
11088.0
11095.0
$
REMARKS:
10802.0
10802.5
10811.0
10815.0
10885.5
10894.5
10906.5
10907.0
10908.0
10939.5
10940.5
10941.5
10942.0
10942.5
10950.0
10950.5
10951.0
10951.5
10952.0
10996.5
11002.5
11054.0
11054.5
11055.0
11066.5
11067.5
11068.5
11070.0
10798.0
10799.0
10800.5
10801.0
10807.0
10808.0
10817.5
10818.0
10820.5
10836.5
10882.0
10900.5
10906.5
10907.0
10916.0
10917.0
10918.5
10919.0
10925.0
10925.5
10937.0
10937.5
10938.5
10939.0
10939.5
10945.5
11052.0
11080.0
11088.0
11095.0
BORAX PASS 1: 20 BBLS AWAY.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/? ?MATCH3A. OUT
/??MATCH3B. OUT
$
CN : BP EXPLORATION
WN : E - 24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
14 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CSLS PDK 68 1 CU 4
6 LS PDK 68 1 CPS 4
7 MSD PDK 68 1 CU 4
8 RATO PDK 68 1 4
9 RBOR PDK 68 1 4
10 RICS PDK 68 1 4
11 RIN PDK 68 1 4
12 SGMA PDK 68 1 CU 4
13 SGMB PDK 68 1 CU 4
14 SS PDK 68 1 CPS 4
4 00 201 24
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
56
* DATA RECORD (TYPE# 0) 966 BYTES *
Total Data Records: 52
Tape File Start Depth = 10685.000000
Tape File End Depth = 11095.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 52653 datums
Tape Subfile: 4 177 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
EDITED CURVES
Depth shifted and clipped curves for each pass in separate
PASS NUMBER: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
START DEPTH
10688.0
10700.0
BASELINE DEPTH GRCH
10698.5 10700.5
10704.0 10706.0
10705.0 10706.5
10706.0 10707.5
10707.0 10708.0
10716.0 10718.0
10717.0 10719.5
10717.5 10720.0
10718.5
10721.0
10721.5
10723.0 10725.0
10723.5 10725.5
10724.5 10726.0
10725.5
10726.5
10727.5
10728.0
10736.0
10737.0
10739.5
10740.5
10750.5
10751.5
10755.0 10756.5
10756.0 10757.0
10764.5 10765.5
10765.0 10766.5
10767.0 10768.5
10768.0 10769.0
10768.5 10769.5
10769.0 10770.5
10769.5 10771.5
10770.5 10772.5
10771.5 10773.0
10772.0 10773.5
10773.0 10774.0
STOP DEPTH
11078.0
11090.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
SGMA
10697.5
10706.0
10720.0
10722.5
10723.5
10727.5
10728.0
10729.0
10730.0
10738.0
10738.5
10741.0
10741.5
10751.5
10752.0
10767.5
10768.0
10770.5
10771.0
files.
10774.0
10775.0
10781.0
10782.0
10782.5
10786.5
10787.0
10788.0
10788.5
10789.0
10789.5
10790.0
10793.0
10793.5
10794.5
10795.5
10796.5
10797.0
10797.5
10798.0
10799.0
10801.0
10801.5
10802.5
10803.5
10807.5
10808.0
10809.0
10810.0
10815.0
10818.0
10819.0
10822.0
10884.5
10885.0
10886.0
10888.0
10890.0
10890.5
10891.0
10896.0
10896.5
10897.0
10897.5
10898.5
10905.0
10906.0
10910.0
10911.0
10913.0
10915.0
10919.5
10921.0
10923.0
10923.5
10924.5
10926.5
10927.0
10929.5
10930.5
10782.0
10782.5
10783.0
10786.0
10788.5
10789.5
10790.5
10793.5
10794.5
10795.5
10796.0
10797.0
10798.0
10798.5
10799.5
10809.0
10810.0
10811.0
10811.5
10816.0
10896.5
10897.0
10898.0
10898.5
10899.0
10906.5
10921.5
10922.0
10922.5
10924.5
10925.5
10773.5
10774.0
10786.0
10786.5
10787.5
10795.5
10796.0
10796.5
10798.5
10799.5
10800.5
10801.0
10815.5
10816.0
10819.0
10883.0
10883.5
10884.0
10886.0
10889.0
10889.5
10892.0
10897.5
10898.0
10905.5
10906.0
10910.0
10910.5
10912.5
10915.0
10919.5
10920.5
10929.0
10929.5
10939.0
10943.0
10943.5
10944.0
10945.0
10945.5
10946.0
10946.5
10947.0
10947.5
10948.5
10949.0
10949.5
10951.0
10952.0
10953.0
10954.0
10982.5
10984.5
10996.5
10998.5
10999.5
11001.5
11002.5
11003.0
11057.5
11060.5
11063.5
11064.0
11064.5
11065.0
11065.5
11066.0
11067.0
11067.5
11068.0
11068.5
11069.0
11071.0
$
REMARKS:
10938.5
10942.5
10943.5
10944.0
10944.5
10944.5
10945.5 10945.0
10946.5
10945.5
10947.5
10948.0
10948.5
10949.5
10949.5
10952.0 10950.0
10952.5
10953.5
10981.0
10983.0
10997.5
10999.5
11000.0
11002.0
11002.5
11003.0
11057.5
11060.5
11064.0
11065.0
11065.0
11066.0 11066.0
11068.0
11068.5
11068.0 11069.0
11069.0 11069.5
11070.5
11070.0 11071.0
11070.5
11074.0
BORAX PASS 2:44 BBLS AWAY.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/ ? ?MATCH4A. OUT
/??MATCH4B. OUT
$
CN : BP EXPLORATION
WN : E- 24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
14 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH PDK 68 1 GAPI
2 BIF PDK 68 1
3 BKL PDK 68 1 CPS
4 BKS PDK 68 1 CPS
5 CSLS PDK 68 1 CU
6 LS PDK 68 1 CPS
7 MSD PDK 68 1 CU
8 RATO PDK 68 1
9 RBOR PDK 68 1
10 RICS PDK 68 1
11 RIN PDK 68
12 SGMA PDK 68 1 CU
13 SGMB PDK 68 1 CU
14 SS PDK 68 1 CPS
4 4 00 201 24 1
4 4 00 201 24
4 4 00 201 24 1
4 4 00 201 24
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
56
* DATA RECORD (TYPE# 0) 966 BYTES *
Total Data Records: 52
Tape File Start Depth = 10685.000000
Tape File End Depth = 11095.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
61464 datums
Tape Subfile: 5
222 records...
Minimum record length:
Maximum record length:
62 bytes
966 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
EDITED CURVES
Depth shifted and clipped curves for each pass
PASS NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
START DEPTH STOP DEPTH
10688.0 11078.0
10700.0 11090.0
(MEASURED DEPTH)
BASELINE DEPTH GRCH
10698.5 10700.5
10703.5 10705.5
10704.5 10706.0
10705.0 10706.5
10706.0 10707.0
10706.5 10707.5
10707.0 10706.0
10715.5 10717.0
10718.5 10720.0
10719.5 10720.5
10721.5 10722.5
10722.0 10723.5
10722.5 10724.5
10723.0 10725.0
10727.5 10729.5
10728.5 10730.0
10737.0 10739.0
10738.0 10739.5
10740.0 10741.5
10741.0 10742.0
10741.5 10743.0
10744.0 10745.5
10745.0 10746.0
10750.5 10751.5
10751.5 10752.0
10766.5 10767.0
10767.5 10767.5
10771.5 10771.5
10772.5 10774.0 10772.0
10773.5 10774.5
10775.0 10774.5
10776.0 10775.0
10786.0 10787.0
10787.0 10787.5
10787.5 10788.5
10792.0 10793.0
10793.0 10793.5
in separate files.
EQUIVALENT UNSHIFTED DEPTH
SGMA
10697.5
10795.5
10796.5
10797.5
10798.5
10799.0
10799.5
10802.5
10803.5
10810.0
10820.0
10821.0
10821.5
10822.0
10823.0
10868.0
10869.5
10870.5
10873.5
10875.0
10877.0
10882.5
10883.0
10886.5
10887.5
10888.0
10889.0
10892.0
10895.0
10896.0
10897.0
10902.0
10905.0
10906.0
10920.5
10921.5
10930.5
10931.0
10931.5
10934.0
10935.0
10940.5
10943.0
10943.5
10944.0
10945.0
10945.5
10948.5
10949.0
10949.5
10950.0
10951.0
10952.0
10952.5
10953.0
10994.5
10996.0
10996.5
11003.5
11047.0
11047.5
10796.0
10797.5
10799.5
10800.5
10811.5
10877.0
10896.0
10903.0
10939.5
10942.0
10943.0
10943.5
10944.0
10945.0
10948.0
10948.5
10951.0
10952.0
10952.5
10993.5
10995.0
10996.0
11003.0
11048.0
11048.5
10796.5
10797.5
10800.5
10801.0
10817.5
10818.0
10818.5
10819.5
10820.5
10868.0
10869.5
10870.0
10873.0
10879.0
10884.5
10886.5
10890.0
10890.5
10891.5
10892.5
10893.0
10897.0
10897.5
10905.5
10906.0
10920.5
10921.0
10930.0
10930.5
10931.0
10933.5
10934.0
10948.0
10948.5
10949.5
10950.0
11048.5
11051.5
11054.0
11057.5
11058.0
11058.5
11059.0
11060.0
11060.5
11061.0
11066.5
11067.0
11067.5
11069.0
11070.0
11070.5
11071.0
11072.0
11077.0
11080.0
11080.5
$
REMARKS:
11049.0
11052.0
11052.5
11056.5
11056.5
11057.5
11058.0
11058.5
11059.0
11060.0
11065.5
11067.0
11067.5
11068.0
11068.5
11069.0
11070.0
11070.5
11073.0
11076.0 11079.0
11076.5 11079.5
BORAX PASS 3:100 BBLS AWAY.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/ ? ?MATCH5A. OUT
/ ? ?MATCH5B . OUT
$
CN : BP EXPLORATION
WN : E - 24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
14 Curves:
1
2
3
4
5
6
7
8
9
10
11
Name Tool Code Samples Units
GRCH PDK 68 1
BIF PDK 68 1
BKL PDK 68 1
BKS PDK 68 1
CSLS PDK 68 1
LS PDK 68 1
MSD PDK 68 1
RATO PDK 68 1
RBOR PDK 68 1
RICS PDK 68 1
RIN PDK 68 1
GAPI
CPS
CPS
CU
CPS
CU
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
12 SGMA PDK 68 1
13 SGMB PDK 68 1
14 SS PDK 68 i
* DATA RECORD (TYPE# 0)
Total Data Records: 52
CU
CU
CPS
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
56
966 BYTES *
Tape File Start Depth = 10685.000000
Tape File End Depth = 11095.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 64969 datums
Tape Subfile: 6 204 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10829.0
PDK 10841.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
12077.0
12089.0
14-JAN-95
FSYS REV. J001 VER. 1.1
1347 14-JAN-95
12166.0
12142.0
10600.0
12130.0
1500.0
YES
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PDK PDK-100
CCL CASING COLLAR LOC
TEMP TEMPERATURE
$
TOOL NUMBER
2725XA
2324XA
2120XA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER' S CASING DEPTH (FT):
.00O
12240.0
.0
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
PROD FLD/SEAH20/BORX
.00
.0
187.0
0
.0
.000
.000
.000
.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
.0
BASE NORMALIZING WINDOW (FT): .0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS) : 2100
FAR COUNT RATE HIGH SCALE (CPS) : 7100
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS) : 0
TOOL STANDOFF (IN):
.0
REMARKS: FLOWING PASS.
THE HIGH SCALE VALUE FOR THE NEAR COUNTS
IS 120,000 CPS.
$
CN : BP EXPLORATION
WN : E - 24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
21 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CCL PDK 68 1 4
6 CSLS PDK 68 1 CU 4
7 CSS PDK 68 1 CPS 4
8 ISS PDK 68 1 CPS 4
9 LS PDK 68 1 CPS 4
10 MON PDK 68 1 CPS 4
11 MSD PDK 68 1 CU 4
12 RATO PDK 68 1 4
13 RBOR PDK 68 1 4
14 RICS PDK 68 1 4
'15 RIN PDK 68 I 4
16 SGMA PDK 68 1 CU 4
17 SGMB PDK 68 1 CU 4
18 SPD PDK 68 1 F/MN 4
19 SS PDK 68 1 CPS 4
20 TEN PDK 68 1 LB 4
21 SGNT PDK 68 1 CU 4
4 06 511 09 0
4 00 201 24 1
4 39 705 61 6
4 74 169 61 6
4 92 630 79 6
4 00 201 24 1
4 00 201 24 1
4 71 162 89 6
4 71 162 89 6
4 32 125 68 0
4 00 201 24 1
4 23 260 40 0
4 23 260 40 0
4 23 260 40 0
4 23 260 40 0
4 96 761 61 6
4 00 201 24 1
4 52 386 28 5
4 05 626 89 6
4 17 922 28 5
4 00 201 24 1
84
* DATA RECORD (TYPE# 0) 974 BYTES *
Total Data Records: 459
Tape File Start Depth = 10829.000000
Tape File End Depth = 12089.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 172367 datums
Tape Subfile: 7 537 records...
Minimum record length: 62 bytes
Maximum record length: 974 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10689.0
PDK 10701.0
$
LOG HEADER DATA
STOP DEPTH
12117.0
12129.0
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PDK PDK-100
CCL CASING COLLAR LOC
TEMP TEMPERATURE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
14-JAN-95
FSYS REV. J001 VER. 1.1
1629 14-JAN-95
12166.0
12142.0
10600.0
12130.0
1500.0
YES
TOOL NUMBER
2725XA
2324XA
2120XA
.000
12240.0
.0
PROD FLD/SEAH20/BORX
.00
.0
187.0
0
.0
.000
.000
.000
.0
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
.0
BASE NORMALIZING WINDOW (FT): .0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 2100
FAR COUNT RATE HIGH SCALE (CPS): 7100
NEAR COUNT RATE LOW SCALE (CPS) : 0
NEAR COUNT RATE HIGH SCALE (CPS) : 0
TOOL STANDOFF (IN):
.0
REMARKS: BASE WATER PASS.
THE HIGH SCALE VALUE FOR THE NEAR COUNTS
IS 120,000 CPS.
$
CN : BP EXPLORATION
WN : E - 24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
22 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 I CPS 4
4 BKS PDK 68 1 CPS 4
5 CCL PDK 68 1 4
6 CSLS PDK 68 1 CU 4
7 CSS PDK 68 1 CPS 4
8 ISS PDK 68 1 CPS 4
9 LS PDK 68 1 CPS 4
10 MON PDK 68 1 CPS 4
11 MSD PDK 68 1 CU 4
12 RATO PDK 68 1 4
13 RBOR PDK 68 1 4
14 RICS PDK 68 1 4
15 RIN PDK 68 1 4
16 SGMA PDK 68 1 CU 4
17 SGMB PDK 68 1 CU 4
18 SPD PDK 68 i F/MN 4
19 SS PDK 68 1 CPS 4
20 TEN PDK 68 1 LB 4
21 SGNT PDK 68 1 CU 4
22 PHI PDK 68 1 PU-S 4
4 06 511 09 0
4 00 201 24 1
4 39 705 61 6
4 74 169 61 6
4 92 630 79 6
4 00 201 24 1
4 00 201 24 1
4 71 162 89 6
4 71 162 89 6
4 32 125 68 0
4 00 201 24 1
4 23 260 40 0
4 23 260 40 0
4 23 260 40 0
4 23 260 40 0
4 96 761 61 6
4 00 201 24 1
4 52 386 28 5
4 05 626 89 6
4 17 922 28 5
4 00 201 24 1
4 00 201 24 1
88
* DATA RECORD (TYPE# 0) 1018 BYTES *
Total Data Records: 524
Tape File Start Depth = 10689.000000
Tape File End Depth = 12129.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 197473 datums
Tape Subfile: 8 602 records...
Minimum record length: 62 bytes
Maximum record length: 1018 bytes
Tape Subfile 9 is type: LIS
FILE HEADER
FILE NUMBER: 8
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10682.0
PDK 10694.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
11078.0
11090.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PDK PDK-100
CCL CASING COLLAR LOC
TEMP TEMPERATURE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
14-JAN-95
FSYS REV. J001 VER. 1.1
1844 14-JAN-95
12'166.0
12142.0
10600.0
12130.0
1500.0
YES
TOOL NUMBER
2725XA
2324XA
2120XA
.O00
12240.0
.0
PROD FLD/SEAH20/BORX
.00
.0
187.0
0
.0
.000
.000
.000
.0
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
.0
BASE NORMALIZING WINDOW (FT): .0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 2100
FAR COUNT RATE HIGH SCALE (CPS) : 7100
NEAR COUNT RATE LOW SCALE (CPS) : 0
NEAR COUNT RATE HIGH SCALE (CPS): 0
TOOL STANDOFF (IN):
.0
REMARKS: BORAX PASS 1:20 BBLS AWAY.
THE HIGH SCALE VALUE FOR THE NEAR COUNTS
IS 120,000 CPS.
$
CN : BP EXPLORATION
WN : E - 24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
20 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CCL PDK 68 1 4
6 CSLS PDK 68 1 CU 4
7 CSS PDK 68 1 CPS 4
8 ISS PDK 68 1 CPS 4
9 LS PDK 68 1 CPS 4
10 MON PDK 68 1 CPS 4
11 MSD PDK 68 1 CU 4
12 RATO PDK 68 1 4
13 RBOR PDK 68 1 4
14 RICS PDK 68 1 4
15 RIN PDK 68 i 4
16 SGMA PDK 68 I CU 4
17 SGMB PDK 68 1 CU 4
18 SPD PDK 68 1 F/MN 4
19 SS PDK 68 1 CPS 4
20 TEN PDK 68 1 LB 4
4 06 511 09
4 00 201 24
4 39 705 61
4 74 169 61
4 92 630 79
4 00 201 24
4 00 201 24
4 71 162 89
4 71 162 89
4 32 125 68
4 00 201 24
4 23 260 40
4 23 260 40
4 23 260 40
4 23 260 40
4 96 761 61
4 00 201 24
4 52 386 28
4 05 626 89
4 17 922 28
0
1
6
6
6
1
1
6
6
0
1
0
0
0
0
6
1
5
6
5
80
* DATA RECORD (TYPES 0) 1014 BYTES *
Total Data Records: 137
Tape File Start Depth = 10682.000000
Tape File End Depth = 11090.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 206661 datums
Tape Subfile: 9 215 records...
Minimum record length: 44 bytes
Maximum record length: 1014 bytes
Tape Subfile 10 is type: LIS
FILE HEADER
FILE NUMBER: 9
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 4
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10684.0
PDK 10696.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
11079.0
11091.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PDK PDK-100
CCL CASING COLLAR LOC
TEMP TEMPERATURE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX. '
MATRIX DENSITY:
HOLE CORRECTION (IN):
14-JAN-95
FSYS REV. J001 VER. 1.1
1909 14-JAN-95
12166.0
12142.0
10600.0
12130.0
1500.0
YES
TOOL NUMBER
2725XA
2324XA
2120XA
.0OO
12240.0
.0
PROD FLD/SEAH20/BORX
.00
.0
187.0
0
.0
.000
.000
.000
.0
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
.0
BASE NORMALIZING WINDOW (FT): .0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 2100
FAR COUNT RATE HIGH SCALE (CPS): 7100
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 0
TOOL STANDOFF (IN):
.0
REMARKS: BORAX PASS 2:44 BBLS AWAY.
THE HIGH SCALE VALUE FOR THE NEAR COUNTS
IS 120,000 CPS.
$
CN : BP EXPLORATION
WN : E - 24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
20 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CCL PDK 68 1 4
6 CSLS PDK 68 1 CU 4
7 CSS PDK 68 1 CPS 4
8 ISS PDK 68 1 CPS 4
9 LS PDK 68 1 CPS 4
10 MON PDK 68 1 CPS 4
11 MSD PDK 68 1 CU 4
12 RATO PDK 68 1 4
13 RBOR PDK 68 1 4
14 RICS PDK 68 i 4
15 RIN PDK 68 I 4
16 SGMA PDK 68 1 CU 4
17 SGMB PDK 68 1 CU 4
18 SPD PDK 68 1 F/MN 4
19 SS PDK 68 1 CPS 4
20 TEN PDK 68 1 LB 4
4 06 511 09
4 00 201 24
4 39 705 61
4 74 169 61
4 92 630 79
4 00 201 24
4 00 201 24
4 71 162 89
4 71 162 89
4 32 125 68
4 00 201 24
4 23 260 40
4 23 260 40
4 23 260 40
4 23 260 40
4 96 761 61
4 00 201 24
4 52 386 28
4 05 626 89
4 17 922 28
0
1
6
6
6
1
1
6
6
0
1
0
0
0
0
6
1
5
6
5
8O
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 136
Tape File Start Depth = 10684.000000
Tape File End Depth = 11091.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 231683 datums
Tape Subfile: 10 214 records...
Minimum record length: 44 bytes
Maximum record length: 1014 bytes
Tape Subfile 11 is type: LIS
FILE HEADER
FILE NUMBER: 10
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 5
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10679.5
PDK 10691.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
11080.0
11092.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PDK PDK-100
CCL CASING COLLAR LOC
TEMP TEMPERATURE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
14-JAN-95
FSYS REV. J001 VER. 1.1
1936 14-JAN-95
12166.0
12142.0
10600.0
12130.0
1500.0
YES
TOOL NUMBER
2725XA
2324XA
2120XA
.0O0
12240.0
.0
PROD FLD/SEAH20/BORX
.00
.0
187.0
0
.0
.000
.000
.000
.0
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
.0
BASE NORMALIZING WINDOW (FT): .0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS) .' 2100
FAR COUNT RATE HIGH SCALE (CPS) : 7100
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS) : 0
TOOL STANDOFF (IN):
.0
REMARKS: BORAX PASS 3:100 BBLS AWAY.
THE HIGH SCALE VALUE FOR THE NEAR COUNTS
IS 120,000 CPS.
$
CN : BP EXPLORATION
WN : E - 24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
20 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CCL PDK 68 1 4
6 CSLS PDK 68 1 CU 4
7 CSS PDK 68 1 CPS 4
8 ISS PDK 68 1 CPS 4
9 LS PDK 68 1 CPS 4
10 MON PDK 68 1 CPS 4
11 MSD PDK 68 1 CU 4
12 RATO PDK 68 1 4
13 RBOR PDK 68 1 4
14 RICS PDK 68 i 4
15 RIN PDK 68 i 4
16 SGMA PDK 68 1 CU 4
17 SGMB PDK 68 1 CU 4
18 SPD PDK 68 1 F/MN 4
19 SS PDK 68 1 CPS 4
20 TEN PDK 68 i LB 4
4 06 511 09
4 00 201 24
4 39 705 61
4 74 169 61
4 92 630 79
4 00 201 24
4 00 201 24
4 71 162 89
4 71 162 89
4 32 125 68
4 00 201 24
4 23 260 40
4 23 260 40
4 23 260 40
4 23 260 40
4 96 761 61
4 00 201 24
4 52 386 28
4 05 626 89
4 17 922 28
80
* DATA RECORD (TYPES 0) 1014 BYTES *
Total Data Records: 138
Tape File Start Depth = 10679.500000
Tape File End Depth = 11092.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 241333 datums
Tape Subfile: 11 216 records...
Minimum record length: 44 bytes
Maximum record length: 1014 bytes
Tape Subfile 12 is type: LIS
95/ 1/31
01
**** REEL TRAILER ****
95/ 1/31
01
Tape Subfile: 12 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Tue 31 JAN 95 4:29p
Elapsed execution time = 21.37 seconds.
SYSTEM RETURN CODE = 0
.pe Su~file 2 is type: LIS
TAPE HEADER
PRUDHOE BAY I/NIT
MWD/MAD LOGS
WELL NAME:
API NI3MBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 18
6562.00
R. FRENCH
J. GAFNEY
E--24A
5(]0292176901
BI? EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
18-JAN-96
~4D RUN 19
B. JAHN
J. GAFNEY
MWD RUN 20
B. JAHN
J. GAFNEY
MWD RUN 21
JOB NUMBER:
LOGGING ENGINEER:
OPER3tTOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
B. JAHN
J. GAFNEY
WELL CASING RECORD
M~D RUN 22
B. JAHN
J. GAFNEY
MWD RUN 23
B. JAHN
D. WESTER
llN
14E
1786
64.68
63.13
30.10
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING 7.000
PRODUCTION STRING 6.000
REMARKS: MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
9839.0
12239.0
WINDOW MILLED IN 7" CASING FROM 9839 - 9889'.
MWD RUNS 1, 2, 8, 16, & 17; NO FOOTAGE WAS MADE ON
THESE RUNS. POLISHED CEMENT PLUG AT KOP.
ALL OTHER RUNS ARE DIRECTIONAL - GAMMA RAY (NGP) .
THIS WELL, E-24A, IS FROM MWD RUNS 18 - 23.
THE WELL E-24A PB1 IS FROM MWD RUNS 3 - 7.
THE WELL E-24A PB2 IS FROM MWD RUNS 9 - 15.
NO DEPTH SHIFTS WERE DONE AS THIS IS THE DEPTH
REFERENCE FOR THIS WELL.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 9790.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
STOP DEPTH
12180.0
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
18 9840.0 10224.0
19 10224.0 10323.0
20 10323.0 10822.0
21 10822.0 11086.0
22 11086.0 11687.0
23 11687.0 12238.0
MERGED MAIN PASS.
GAMMA RAY DATA FROM 10346 - 10361' & FROM 10391 -
10756' IS FROM MAD PASSES #2 & #1 (AFTER MWD RUN 20)
RESPECTIVELY.
CN : BP EXPLORATION
WN : E-24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 59
Tape File Start Depth = 12239.000000
Tape File End Depth = 9790.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
14698 datums
Tape Subfile: 2
157 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED MERGED MAD
Depth shifted and clipped curves; all MAD runs merged using earliest passes.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GR
$
MERGED DATA SOURCE
PBU TOOL CODE
$
REMARKS:
START DEPTH
10341.0
STOP DEPTH
10768.0
MAD RUN NO. MAD PASS NO. MERGE TOP
20 2 10401.0
20 1 10446.0
MAD PASSES #1 & #2 RUN AFTER MWD RUN 20.
$
MERGE BASE
10441.0
10824.0
CN : BP EXPLORATION
WN : E-24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECOR'D (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MAD 68 1 AAPI 4
2 RATE MAD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 95 995 99 1
4 95 995 99 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 12
Tape File Start Depth = 10825.000000
Tape File End Depth = 10340.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
_~ Code: 68 2914 datums
Tape Subfile: 3 36 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
lape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 18
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9790.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIM UMANGLE:
STOP DEPTH
10175.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS: MWD RUN 18.
03-NOV-94
MWD 2.19
1.09
MEMORY
10224.0
9840.0
10224.0
0
.0
.0
TOOL NUMBER
6.O00
9839.0
KCL/BIOPOLYMER
9.20
94.0
9.8
32000
5.0
.000 .0
.000 .0
.000 .0
.000 .0
.00
.000
.0
0
CN : BP EXPLORATION
WN : E-24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 11
Tape File Start Depth = 10225.000000
Tape File End Depth = 9790.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
17312 datums
Tape Subfile: 4
74 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
lape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 19
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10165.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10263.0
04-NOV-94
MWD 2.19
1.09
MEMORY
10323.0
10224.0
10323.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT) :
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL/BIOPOLYMER
9.20
95.0
9.6
32500
5.0
.000 .0
.000 .0
.000 .0
.000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 19.
CN : BP EXPLORATION
WN : E-24A
FN : PRUDHOE BAY
COLIN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10325.000000
Tape File End Depth = 10160.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 3908 datums
Tape Subfile: 5 67 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
~fape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 20
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10264.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10391.0
06-NOV-94
MWD 2.19
1.09
MEMORY
10822.0
10323.0
10822.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL/BIOPOLYMER
9.20
76.0
9.8
34500
4.8
.000 .0
.000 .0
.000 .0
.000 ,0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 20.
CN : BP EXPLOP~ATION
WN : E-24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 O1 1
4 90 810 O1 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10455.000000
Tape File End Depth = 10260.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
18486 datums
Tape Subfile: 6
68 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
±'ape Subfile 7 is type: LIS
FILE HEADER
FILE NIIMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 21
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10756.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10949.0
07 -NOV- 94
MWD 2.19
1.09
MEMORY
11086.0
10822.0
11086.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT) :
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL/BIOPOLYMER
9.20
77.0
9.6
37500
4.4
.000 .0
.000 .0
.000 .0
.000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 21.
CN : BP EXPLORATION
WN : E-24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 11015.000000
Tape File End Depth = 10750.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 5502 datums
Tape Subfile: 7 70 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 22
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11027.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11628.0
09-NOV-94
MWD 2.19
1.09
MEMORY
11687.0
11086.0
11687.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL/BIOPOLYMER
9.20
81.0
10.0
35000
4.8
.000 .0
.000 .0
.000 .0
.000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 22.
CN : BP EXPLORATION
WN : E-24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 16
Tape File Start Depth = 11690.000000
Tape File End Depth = 11025.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 22480 datums
Tape Subfile: 8 79 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 9 is type: LIS
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 23
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11628.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12180.0
il-NOV-94
MWD 2.19
1.09
MEMORY
12238.0
11687.0
12238.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL/BIOPOLYMER
9.20
90.0
9.7
28500
4.6
.000 .0
.000 .0
.000 .0
.000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 23.
CN : BP EXPLORATION
WN : E-24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 15
Tape File Start Depth = 12239.000000
Tape File End Depth = 11625.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
9190 datums
Tape Subfile: 9
78 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 10 is type: LIS
FILE HEADER
FILE NUMBER: 9
RAW MAD
Curves and log header data for each pass of each run in separate files.
MAD RUN NUMBER: 20
MAD PASS NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10386.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUMANGLE:
STOP DEPTH
10768.0
06-NOV-94
MWD 2.19
1.09
MEMORY
10822.0
10386.0
10768.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL/B IOPOLYMER
9.20
76.0
9.8
34500
4.8
.000 .0
.000 .0
.000 .0
.000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
· ~.EMARKS:
MAD PASS 1, LOGGED AFTER MWD RUN 20.
$
CN : BP EXPLORATION
WN : E-24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MAD 68 1 AAPI 4
2 SRAT MAD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 95 995 99 1
4 95 995 99 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 11
Tape File Start Depth = 10825.000000
Tape File End Depth = 10385.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
25124 datums
Tape Subfile: 10
75 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
_ape Subfile 11 is type: LIS
FILE HEADER
FILE NUMBER: 10
RAW MAD
Curves and log header data for each pass of each run in separate files.
MAD RUN NUMBER: 20
MAD PASS NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10341.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10381.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT ~ CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
06-NOV-94
MWD 2.19
1.09
MEMORY
10822.0
10341.0
10381.0
0
.0
.0
TOOL NUMBER
6.000
9839.0
KCL/BIOPOLYMER
9.20
76.0
9.8
34500
4.8
.000 .0
.000 .0
.000 .0
.000 .0
.00
.000
.0
0
~tEMARKS:
MAD PASS 2, LOGGED AFTER MWD RUN 20.
$
CN : BP EXPLORATION
WN : E-24A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MAD 68 1 AAPI 4
2 SRAT MAD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 95 995 99 1
4 95 995 99 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10445.000000
Tape File End Depth = 10340.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 9824 datums
Tape Subfile: 11 67 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
_ape Subfile 12 is type: LIS
96/ z/20
01
**** REEL TRAILER ****
96 / 1/22
01
Tape Subfile: 12 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Mon 22 JAN 96 11:32a
Elapsed execution time = 1.92 seconds.
SYSTEM RETURN CODE = 0
Tape'Sub~ile 2 is type: LIS
TAPE HEADER
PRUDHOE BaY I/NIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 3
6563.00
R. FRENCH
J. ROBERTSON
E-24A PB1
500292176970
BP EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
19-JAN-96
MWD RUN 4
R. FRENCH
J. ROBERTSON
MWD RUN 5
R. FRENCH
J. ROBERTSON
MWD RUN 6
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
R. FRENCH
J. ROBERTSON
WELL CASING RECORD
MWD RUN 7
R. FRENCH
J. ROBERTSON
6
liN
14E
1786
501
64.68
63.13
30.10
MICROFILMED
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING 7.000
PRODUCTION STRING 6.000
REMARKS: MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
9839.0
10632.0
WINDOW MILLED IN 7" CASING FROM 9839 - 9889'.
MWD RUNS 1, 2, 8, 16, & 17; NO FOOTAGE WAS MADE ON
THESE RUNS. POLISHED CEMENT PLUG AT KOP.
ALL OTHER RUNS ARE DIRECTIONAL - GAMMA RAY (NGP) .
THIS WELL, E-24A PB1, IS FROM MWD RUNS 3 - 7.
THE WELL E-24A PB2 IS FROM MWD RUNS 9 - 15.
THE WELL E-24A IS FROM MWD RUNS 18 - 23.
NO DEPTH SHIFTS WERE DONE AS THIS IS THE DEPTH
REFERENCE FOR THIS WELL.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 9656.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
STOP DEPTH
10583.0
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
3 9780.0 10080.0
4 10080.0 10282.0
5 10282.0 10341.0
6 10341.0 10396.0
7 10396.0 10632.0
MERGED MAIN PASS.
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: E-24A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 24
~pe File Start Depth = 10632.000000
Tape File End Depth = 9656.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 5860 datums
Tape Subfile: 2 118 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9656.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10025.0
15-OCT-94
MWD 2.19
1.09
MEMORY
10080.0
9780.0
10080.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOPOLYMER
9.00
82.0
11.0
31000
5.6
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 3.
CN : BP EXPLORATION
WN : E-24A PB1
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 11
Tape File Start Depth = 10085.000000
Tape File End Depth = 9656.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 2578 datums
Tape Subfile: 3 74 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
R_AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10014.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10216.0
16-OCT-94
MWD 2.19
1.09
MEMORY
10282.0
10080.0
10282.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT) :
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOPOLYMER
9.10
80.0
11.0
30000
6.0
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 4.
CN : BP EXPLORATION
WN : E-24A PB1
FN : PRUDHOE BAY
COLIN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10285.000000
Tape File End Depth = 10010.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7514 datums
Tape Subfile: 4 70 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10212.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUMkNGLE:
STOP DEPTH
10292.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT) :
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 5.
16-OCT-94
MWD 2.19
1.09
MEMORY
10341.0
10282.0
10341.0
0
.0
.0
TOOL NUMBER
6.000
9839.0
BIOPOLYMER
9.05
75.0
10.2
31500
5.6
.000
.000
.000
.000
.0
.0
,0
.0
.00
.000
.0
0
CN : BP EXPLORATION
WN : E-24A PB1
FN : PRUDHOE BAY
COI/N : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10345.000000
Tape File End Depth = 10210.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
3392 datums
Tape Subfile: 5
67 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10281.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10346.0
17-0CT-94
MWD 2.19
1.09
MEMORY
10396.0
10341.0
10396.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOPOLYMER
9.05
74.0
10.1
30000
5.6
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 6.
CN : BP EXPLORATION
WN : E-24A PB1
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 3
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
Tape File Start Depth = 10400.000000
Tape File End Depth = 10280.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 8238 datums
Tape Subfile: 6 66 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NI3MBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 7
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10346.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MuAXI~ANGLE:
STOP DEPTH
10583.0
19-OCT-94
MWD 2.19
1.09
MEMORY
10632.0
10396.0
10632.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT) :
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTP~ATE AT MT:
MUD CAKE AT MT:
BIOPOLYMER
9.05
80.0
9.6
31500
5.4
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 7.
CN
WN
FN
COUN
STAT
: BP EXPLORATION
: E-24A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10632.000000
Tape File End Depth = 10345.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 5118 datums
Tape Subfile: 7 70 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 8 is type: LIS
96/ 1/20
01
**** REEL TRAILER ****
96/ 1/22
01
Tape Subfile: 8 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Mon 22 JAN 96 1:28p
Elapsed execution time = 1.21 Seconds.
SYSTEM RETURN CODE = 0
~ sUbfile 2 is typ~: L%S
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 3
6564.00
R. FRENCH
D. ROBERTSON
E-24A PB2
500292176971
BP EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
19-JAN-96
MWD RUN 4
R. FRENCH
D. ROBERTSON
MWD RUN 9
R. FRENCH
D. HEIM
JOB NI/MBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 10
R. FRENCH
D. HEIM
MWD RUN 11
R. FRENCH
D. HEIM
MWD RUN 12
R. FRENCH
D. HEIM
MWD RUN 13
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
R. FRENCH
D. HEIM
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
MWD RUN 14
OPEN HOLE
R. FRENCH
D. WESTER
REMARKS:
6
liN
14E
1786
501
64.68
63.13
30.10
MWD RUN 15
R. FRENCH
D. WESTER
MICROFILMED
CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
7.000 9839.0
6.000 11719.0
MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WINDOW MILLED IN 7" CASING FROM 9839 - 9889'.
MWD RUNS 1, 2, 8, 16, & 17; NO FOOTAGE WAS MADE ON
THESE RUNS. POLISHED CEMENT PLUG AT KOP.
ALL OTHER RUNS ARE DIRECTIONAL - GAMMA RAY (NGP).
THIS WELL, E-24A PB2, IS FROM MWD RUNS 3, 4, 9 - 15.
KICK-OFF POINT FROM PREVIOUS HOLE, E-24A PB1, IS AT
10200'.
THE WELL E-2.4A PB1 IS FROM MWD RUNS 3 - 7.
THE WELL E-24A IS FROM MWD RUNS 18 - 23.
NO DEPTH SHIFTS WERE DONE AS THIS IS THE DEPTH
REFERENCE FOR THIS WELL.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 9656.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD 3
MWD 4
MWD 9
MWD 10
MWD 11
MWD 12
MWD 13
MWD 14
MWD 15
$
REMARKS: MERGED MAIN PASS.
STOP DEPTH
11670.0
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP
MERGE BASE
9780.0 10080.0
10080.0 10198.0
10198.0 10244.0
10244.0 10259.0
10259.0 10407.0
10407.0 10741.0
10741.0 11210.0
11210.0 11607.0
11607.0 11719.0
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 50
Tape File Start Depth = 11720.000000
Tape File End Depth = 9656.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
12388 datums
Tape Subfile: 2
155 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9656.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIM UMANGLE:
STOP DEPTH
10025.0
15-0CT-94
MWD 2.19
1.09
MEMORY
10O8O.O
9780.0
10080.O
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAJ~ GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
TOOL NUMBER
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
B I 0 POLYMER
9.00
82.0
11.0
31000
5.6
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 3 .
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 11
Tape File Start Depth = 10085.000000
Tape File End Depth = 9656.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 2578 datums
Tape Subfile: 3 74 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
'rape Subfile 4 is typ~: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10014.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIM UMANGLE:
STOP DEPTH
10216.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 4.
16-OCT-94
MWD 2.19
1.09
MEMORY
10282.0
10080.0
10282.0
0
.0
.0
TOOL NUMBER
6.000
9839.0
BIOPOLYMER
9.10
80.0
11.0
30000
6.0
.000
.000
.000
.000
.0
.0
.0
.0
.00
.000
.0
0
DATA BELOW KICK-OFF POINT AT 10200' IS FROM THE WELL
E-24A PB1.
$
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 t FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10285.000000
Tape File End Depth = 10010.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 14042 datums
Tape Subfile: 4 72 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 9
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10149.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMIIMANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10194.0
21-0CT-94
MWD 2.19
1.09
MEMORY
10244.0
10198.0
10244.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE A_ND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G) :
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOPOLYMER
9.10
119.0
11.3
26000
6.0
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 9.
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COLIN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10245.000000
Tape File End Depth = 10145.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 3182 datums
Tape Subfile: 5 66 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
rape Subfile 6 is typ~: LiS
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 10
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10169.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10210.0
22-OCT-94
MWD 2.19
1.09
MEMORY
10259.0
10244.0
10259.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MI/D DENSITY (LB/G) :
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOPOLYMER
9.20
112.0
11.7
30000
6.0
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 10.
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10260.000000
Tape File End Depth = 10165.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
TaPe Subfile: 6
14616 datums
66 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
rape Subfile 7 is typ~: Lis
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 11
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10210.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10357.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 11.
23-OCT-94
MWD 2.19
1.09
MEMORY
10407.0
10259.0
10407.0
0
.0
.0
TOOL NUMBER
6.000
9839.0
BIOPOLYMER
9.20
82.0
10.6
29250
4.8
.000
.000
.000
.000
.0
.0
.0
.0
.00
.000
.0
0
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10410.000000
Tape File End Depth = 10205.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 4416 datums
Tape Subfile: 7 68 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
rape Subfile 8 is type: LiS
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 12
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10346.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMIIMANGLE:
STOP DEPTH
10699.0
24-OCT-94
MWD 2.19
1.09
MEMORY
10741.0
10407.0
10741.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NIIMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOPOLYMER
9.20
83.0
10.8
29500
4.4
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 12.
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI
2 ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 10
Tape File Start Depth = 10745.000000
Tape File End Depth = 10345.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 17020 datums
Tape Subfile: 8 73 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
~ape Subfile 9 is type: Lis
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 13
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10691.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11161.0
26-OCT-94
MWD 2.19
1.09
MEMORY
11210.0
10741.0
11210.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NLTMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
B I OPOLYMER
9.25
92.0
8.6
30100
4.4
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 13.
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COLIN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 13
Tape File Start Depth = 11215.000000
Tape File End Depth = 10690.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7570 datums
Tape Subfile: 9 76 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
·'ape Subfile 10 is type: LIS
FILE HEADER
FILE NUMBER: 9
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 14
DEPTH INCREMENT: .S000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11157.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11557.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 14.
27-OCT-94
MWD 2.19
1.09
MEMORY
11607.0
11210.0
11607.0
0
.0
.0
TOOL NUMBER
6.000
9839.0
BIOPOLYMER
9.20
105.0
8.9
32500
4.4
.000
.000
.000
.000
.0
.0
.0
.0
.00
.000
.0
0
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE% 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name To°l Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 11
Tape File Start Depth = 11605.000000
Tape File End Depth = 11155.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 19724 datums
Tape Subfile: 10 74 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
rape Subfile 11 is t~pe: LIS
FILE HEADER
FILE NUMBER: 10
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 15
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11534.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11670.0
29-OCT-94
MWD 2.19
1.09
MEMORY
11719.0
11607.0
11719.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL G~ PROBE
$
TOOL NUMBER
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
9839.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASI/RED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
B I OPOLYMER
9.20
76.0
9.0
32750
4.4
.000
.000
.000
.000
.0
.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 15.
CN : BP EXPLORATION
WN : E-24A PB2
FN : PRUDHOE BAY
COLIN : NORTH SLOPE
STAT : ALAStfA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 11720.000000
Tape File End Depth = 11530.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 8714 datums
Tape Subfile: 11 68 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
· ape Subfile 12 is type: LIS
96/ 1/20
01
**** REEL TRAILER ****
96/ 1/22
01
Tape Subfile: 12 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Mon 22 JAN 96 l:40p
Elapsed execution time = 1.87 seconds.
SYSTEM RETURN CODE = 0