A/~ASKA 0iL & GA~ CONSERVATION COMMISSION
Spud:
Rev-'aw the we.i ~ .=: ~ e, and- c~en= c: plugging, well head
sua='~,s, and !cca=icn c!earanca .- urovide Loc. clear, coda.
,~arker post or plate:
Loca:ion Clearanc.:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION Plugged Back for CTD Sidetrack
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 94-134 399-075
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20668-01
4. Location of well at surface 9. Unit or Lease Name
903' SNL, 501' WEb, SEC. 06, T11N, R14E, UM ?~~~ Prudhoe Bay Unit
At top of productive interval!~I 10. Well Number
2005' SNL, 214' WEb, SEC. 01, T11N, R13E, UM E-15A
At total depth [~~ 11. Field and Pool
2330' SNL, 1063' WEb, SEC. 01, T11N, R13E, UM Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and sen"~T'R~7'i .... Pool
KBE = 65.04'I ADb 028280
12. Date Spudded11/30/94 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' water depth' if OffshOre 116' NO' Of cOmpletiOns12/11/94 5/25/99 N/A MSLI Zero
17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV ~1~[~ 121. Thickness of Permafrost
11684 8990 FTI 11667 8990 FTI I~Yes [~No ~,, ~' ¢' f_' ~, '\1~/~ ' 1900' (Approx.)
22. Type Electric or Other Logs Run ~ ~ ~ [.. ~ '¢ .'--~, ~'
LWD, GR, CCL
23. CAS,N.G, L,NER AND CEMENT,NC RECORD
CASING SETTING DEPTH HOLE ...~t
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD .. _~ ¢,r~rC~ft't..~ea!~OUNT PULLED
20"X 30" Insulated Conductor Surface 110' 36" 8 cu yds co/[m,~J'~0i~ & l~StS, t~u~o...," ......
13-3/8" 72# L-80 Surface 2671' 17-1/2" 3720 cu ft/~c"tT~set II
7" 26# L-80 9381' 10290' 8-1/2" ~68 cu ft Class 'G'
4-1/2" 12.6# L-80/13Cr 9736' 11667' 6" 162 cuff Class 'G' "-'; : ' ..... ' ~ ~ L_
, ,,
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 9689' 9626'
MD TVD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10520' Cast iron Bridge Plug
10427' Set Whipstock
27. PRODUCTION TEST
Date First Production [Method of Operation (Flowing, gas lift, etc.)
Not on ProductionI N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBL CHOKE SIZE ]GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBb IGAs-MCF WATER-BBb OIL GRAViTY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Subsea
Top Zone 1B 10718' 8878'
31. List of Attachments
Summary of Daily Drilling Report
32. I hereby certify that the foregoing is true an.d correct to the best of my knowledge
Terrie Hubble , Title Technical Assistant III Date
E-15A 94-134 399-075 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL-' This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
To:
From:
Anchorage Production Engineering
cc: Ted Stagg/John McMullen SSD
Wendt
Well: E-15a
Operation:
Set CIBP & Whipstock Anchor. Run Dummy
Whipstock Stinger to check orientation
Date:
Cost Code:
Detail Code:
Job ID:
Est Daily Cost:
May 25 & 26, 1999
4P1279-9335-070-xxx
CTSDTRK/Rig Prep/etc
N/A
$64,402**
Summary
Ma¥25 & 26, 1999: MIRU HB&R. Kill well with 313 bbls filtered 2% KCL water and freeze protect tubing
with 30 bbls MEOH. MIRU SWS Ut #2158. Pick up Baker CIBP on SAFE system. RIH. Set CIBP at 10520'
(ref: PDS GR/CCL 3/12/96). POH. PT tubing to 1500 psi. OK. Call for radio silence. Pick up TIW
Whipstock anchor and RIH. Set bottom of anchor at 10440' (ref: PDS GR/CCL 3/12/96). Good surface
indication of set. POS tool indicated lug orientation at 38° right of high side. POH. Lay down setting tool
and POS tool. Pick up WS latch with GPIT. RIH to verify orientation. Inconsistent orientation readings.
POH to inspect tools. Check repeatability of POS and GPIT tools on the surface. Both repeat well. Stinger
has been in anchor slot ..... tattletale sheared. Marks on bullnose suggest stinger tagging hard on something,
possibly the top of the anchor at higher eline speed. Replace tattletale, add swivel to GPIT tool. RIH. Tag
anchor at 20 fpm. Make four entries, all consistent at 112° to 115° left of high side. POH. Tattletale not
sheared. RIH again. Make six entries at various running speeds. Readings varied from 114° to 128° left of
high side (looking downhole). Wellbore deviation is 51.7°. POH. Tattletale (2" long piece of lead solder)
mashed against key, but not sheared. The key is shiny on the bottom like it has rubbed in the keyway. The
tattletale is not sheared possibly due to the high wellbore deviation. This is the highest wellbore deviation
that this anchor has been set in by this TIW representative. Discuss options with Slope CTD personnel.
Given the facts that (a) the well is highly deviated reducing ability to set down weight, (b) the positive
markings on the stinger indicating entry into the anchor, and (c) that thirteen readings fell between 111° and
128° left of high side, the orientation verification is thought to be valid. Rig down SWS Ut #2158.
Note: Estimated Daily Costs include the cost of the TIW Whipstock and personnel time to run it,
although these costs will be incurred after CTD rig up.
Initial Well Status SiWHP lAP 0AP GLP FLP FLT
(psi) (psi) (psi) (psi) (psi) (°F)
Shut In 0 500 0 N/A 200 45
Time Operation
0500 MIRU HB&R & Peak for well kill. Safety meeting.
0630 MIRU SWS Ut #2158. Safety Meeting. PU Baker CIBP and setting tool (SAFE system)
0730 Stab lubricator, RU HB&R for PT
0810 PT lubricator to 2500 psi. OK.
0815 Open Swab, RIH
0928 Tie in with CCL at jewelry
0941 Set down at liner top @ 9736'. Make three attempts at various speeds to pass. Continue in hole.
Page1
Jperation: E-15a CIBP & WS A,,chor
May 25 & 26, 1999
Page: 2
Time Operation
0950 Run tie in strip 10600' to 10450'. Position plug at 10520' (ref PDS GR/CCL 3/12/96)
1000 Set plug. Good indication of set.
1010 Tag plug - OK. POH
1115 CCH, LD setting tools
1140 PT tubing to 1500 psi
1210 'Safety Meeting with TIW while PT.
1235 RDHB&R. PT OK
1310 RU TIW anchor and setting tools
1330 Short Found in Owen Firing head. Wait on parts from Deadhorse
1430 Make up tools and check orientation. Packer lug orientation is 55° left of POS 0°. Safety Audit By
Thayer/Walsh in progress
1500 Call for radio silence.
1540 Stab lubricator. Open swab (34 turns) and RIH. lAP=480, CAP=0, WHP=250
1650 Tie in at jewelry
1710 Log up from 10480' to 10300' to check tie in
1720 Pull into position. Set anchor at 10440' (btm of anchor)
1730 POH
1820 At surface. Bleed down and LD tools.
1835 PU Stinger and GPIT. Lug orientation is 13° right of GPIT 0°
1855 Open swab, RIH
1935 On bottom. Sting into anchor six times at various speeds. Readings from 120° left to 26° right.
First 3 readings consistent at lower running speed. Last three at higher running speed very
inconsistent.
1950 POH to inspect latch and tool string.
2045 CCH. Bleed down and lay down tool string. Check repeatability of POS and GPIT tools on the
surface. Both repeat well. Stinger has been in anchor slot ..... tattletale sheared. Marks on bullnose
suggest stinger tagging hard on something.
2145 Replace tattletale, add swivel to GPIT tool
2200 RIH. Will tag anchor at slower speed and try to get 3 repeatable readings.
2240 Enter Anchor with stinger.
Attempt #1: Orientation = 111° left of high side (looking downhole)
Attempt #2: Orientation = 114° left of high side (looking downhole)
Attempt #3: Orientation = 113° left of high side (looking downhole)
Attempt #4: Orientation = 115° left of high side (looking downhole)
Hole Deviation: 51.3°
2255 POH
~peration: E-15a CIBP & WS ~,,,chor
May 25 & 26, 1999
Page: 3
Time Operation
2340 OOH. Bleed down, lay down tools. Tattletale not sheared.
2350 RIH
0020 Enter Anchor with stinger.
Attempt #1: Orientation -- 123° left of high side (looking downhole)
Attempt #2: Orientation = 114° left of high side (looking downhole)
Attempt #3: Orientation = 126° left of high side (looking downhole)
Attempt #4: Orientation = 128° left of high side (looking downhole)
Attempt #5: Orientation = 126° left of high side (looking downhole)
Attempt #6: Orientation = 114° left of high side (looking downhole)
Hole Deviation: 51.7°
0050 POH
0135 OOH. Bleed down, lay down tools. Tattletale mashed against key, but not sheared. Key is shiny on
the bottom like it has rubbed in keyway. Tattletale possibly not sheared because of the high
deviation. This is the highest deviation ever set by this TIW representative.
0150 Discuss with McMullen & Hupp. Data thought to be valid. Decide to rig down eline.
0230 RD SWS
0400 Off location.
Final Well Status SIWHP lAP OAP GLP FLP FLT
(psi) (psi) (psi) (psi) (psi) (°F)
Shut In 250 480 0 N/A 200 50
Fluids Pumped
BBLS. Description
313 2% KCL
56 MEOH
369 Total Volume Pumped
Well: E-15B Accept: 05/26/99
Field: Prudhoe Bay Spud: 05/29/99
APl: 50-029-20668-02 Re leas e:
Permit: 99-042 CTD Unit: Nordic #1
05/27/99 1 10237'
Moved Nordic I f/E-10A to E-15. Rig accepted at 12:30 hrs 5/26/99. RU slickline. Ran Sperry
EMS & TIW indicator. Located in WS anchor. Orientation of Key is 46° R. POH & RD slickline.
RIH w/TIW WS tray & anchor. Latched tray into WS anchor. Released running tool w/6K
overpull. POH w/running tool. LD running tool. MU Weatherford 3.80" window mill & 2-7/8"
motor. RIH w/window mill assy.
05/28/99 2 10428'
TIH w/Milling BHA. Tag up on XN Nipple, correct depth (+18'). Mill thru XN Nipple, TIH to
whipstock. Tag up on whipstock, flag pipe at 10427'. Begin milling, unable to make headway.
Motor stalling, not drilling off. POOH. Found chunks of rubber had come off stator. Replace
motor, TIH. Milled for 5 hrs. Made very little progress. POH to check mill and motor. Changed
motor and mill. RIH. Attempt to mill at 10427.5'. (Motor stalling.)
05/29/99 3 10433'
Attempted to mill w/ bladed mill. Made no progress below 10427'. POH. Changed to
Weatherford.tapered (crayon) mill. RIH. Attempted to mill. Continued to stall at 10427'.
Attempted injectivity test. Held 2000 psi. Have not milled thru csg wall. POH. Changed Packoff.
Cut off 50 ft of coil. Changed to HC Diamond one step mill. RIH. Milled f/10427-10433'.
05/30/99 4 11032'
Finish milling window. POOH, LD Milling BHA, PU Drilling BHA. TIH, tag up and correct depth
(+16'). Drill and orient to move away from casing and drop angle. Drill ahead to 10835'
(uncorrected depth). Wiper trip. Ran tie-in Icg. Made -21 ft correction to original E-15 open hole
Icg (10/81). Corrected Depths: Window f/10406-412'. RA tag at 10,412'. Drilled to 10889'.
Stuck while surveying. Worked stuck pipe. Pipe came free w/o crude. Wiper trip to window.
Drilled to 11032'. Attempted to orient to 45R. Tool kept flipping to 90-100R. Short trip to improve
orienting.
05/31/99 5 11675'
Finished wiper trip. Drilled to 11253'. 500 ft short trip. Drilled to 11415'. Short tripped to window.
Drilled to 11515'. Wt transfer problems. Short tripped to window. Drilled to 11629'. Wt transfer
problems. Short tripped to window. Drilled to 11675'. Decision made to plug back due to poor
sand quality. POH. Ran tie-in Icg (+18 correction). POH to plug back.
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Date: April 3, 1999
To:
Alaska. Oil & Gas Conservation-Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention'
Blair Wondzell
Sr. Petroleum Engineer
Re:
Well E-15b CT Sidetrack
Well E-15a is scheduled for a through tubing sidetrack to be drilled
with coiled tubing. A schematic diagram of the proposed sidetrack
completion is attached. E-15a is a horizontal sidetrack with both
perforations and slotted liner in the horizontal section to be
abandoned. E-15b will be completed with a fully cemented and
perforated 2 7/8" liner. The following summarizes the procedure
required to prepare E-15a for sidetracking and is submitted as an
attachment to Form 10-403.
1. A tubing integrity test was successfully performed on 3/29/99.
2. Tubing and liner will be drifted with a 3.65" OD drift.
3. A Cast Iron Bridge Plug will be set at 10,500', above existing perfs.
The well will be pressure tested to 1500 psi against this bridge
plug.
4. A 4.5" whipstock will be set on E-Line at 10,424'.
5. Window milling through the 4 ½" liner will be done by drilling coil
after approval of the Form 10-40t.
Prep work is expected to begin by May 15, 1999 and milling/drilling is
expected to begin about May 20, 1999.
?¢
Ted Stagg
CT Drilling Engineer
cc: Well File
Petrotechnical Data Center
~---- STATE OF ALASKA --.
ALASK/-, _,IL AND GAS CONSERVATION CO,v,MISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging I--ITime Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
903' SNL, 501' WEL, SEC. 06, T11N, R14E, UM
At top of productive interval
2005' SNL, 214' WEL, SEC. 01, T11N, R13E, UM
At effective depth
2325' SNL, 1050' WEL, SEC. 01, T11N, R13E, UM
At total depth
2330' SNL, 1063' WEL, SEC. 01, T11N, R13E, UM
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
I~ Service
6. Datum Elevation (DF or KB)
KBE: 65.04'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
E-15A
9. Permit Number
94-134
10. APl Number
50-029-20668-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured 11684 feet
true vertical 8990 feet
Effective depth: measured 11667 feet
true vertical 8990 feet
Casing Length Size
Structural
Conductor 110' 20"x 30"
Surface 2671' 13-3/8"
Intermediate 9872' 9-5/8"
Production 909' 7"
Liner 1931' 4-1/2"
4-1/2" Baker IBP at 11495'
Plugs (measured)
Junk (measured)
Cemented
8 cu yds concrete
3720 cu ft Arcticset II
1415 cu ft Class 'G', 130 cu ft AS I
468 cu ft Class 'G'
162 cu ft Class 'G'
Alar~ 0il & Gas C0nsr~¢rr_¢4si~'~
Anchorage
110' 110'
2671' 2671'
9872' 8391'
9381' - 10290' 8009' - 8723'
9736' - 11667' 8284' - 8992'
Perforation depth: measured 10890' - 10920', 10988' - 11495' (Slotted section), 11495' - 11655 (Slotted, below IBP)
true vertical 8983'- 8985', 8990'- 8998', 8998'- 8993 (below IBP)0P~[¢INAL
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 9689'
Packers and SSSV (type and measured depth) 7" Baker packer at 9626'; 4-1/2" Otis SSSV landing nipple at 2076'
13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch
4. Estimated date for commencing operation
May 15, 1999
16. If proposal was verbally approved
Name of approver
Contact Engineer Name/Number: Ted Stagg, 564-4694
Date approved
I15. Status of well classifications as:
[] Oil [] Gas E~ Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~
Ted Stagg Title CT Drilling Engineer
I ~ ~ Commission Use Only
Date
Conditions of Approval: Notify Commission so representative may witness
Plug integrity ,,,'" BOP Test ~ Location clearance__
Mechanical Integrity Test Subsequent form req~i¢-
ORIGINAL SIGNED-BY
Robert N Christenson · ~,e-,'-"- ,.-q' 7~
Approved by order of the Commission · _~ . ~. Commissioner
Form 10-403 Rev. 06/15/88 ~'~~
I Approval N o.,~?~'.-.
Submit In Triplicate
TREE: 6" CIW
WELLHEAD: FMC
ACTUATOR: BAKER
E-15b Proposed Completion
KB. ELEV = 60.74'
BF. ELEV = 32.21'
9-5/8 D.V. PACKER I 2,600
13 3/8" 72#
L-80 BTRS 12,670
4.5", 12.6#, NSCT, L-80
TUBING ID: 3.958"
CAPACITY: .01522 BBL/FT
SSSV LANDING NIPPLE
(OTIS) (3.813" ID)
GAS LIFT MANDRELS
4.5"xl.5"
(MERLA)(W/RA LATCHES)
N° MD(BKB) TVDss I Dev
2 4,418 4,191 I 41
1 7,881 6,821 I 40
Top of 7" Liner 19,38 I
9-5/8", 47#/ft, L-80, 19,872
BTRS Shoe
PERFORATION SUMMARY
REF: LOG: SPERRY SUN MWD 12/1/94
Size SPF Interval Open/Sqzed
2-7/8" 6 10,890- 10,920' Open 12/98
4-1/2" n/a 10,988- 11,495' 13CR Slotted
Below IBP set 11,495 4~96
4-1/2" J n/a 11,495-11,655'113CRSIotted
4-1/2 .... X" NIPPLE
(OTIS)(3.813"ID)
/ 7" Baker Packer
(SABL-3)(3.875" ID)
4-1/2 .... X" NIPPLE
(OTIS)(3.813"ID)
4-1/2 .... XN" NIPPLE
(OTIS)(3.725"ID)
4-1/2" WLEG
ELMD
I 9,605
19,626
19,660
9,677
9,689
9,701
6"41/2" TIW Tie Back
I9,736
7" 26# L-80
BTRS Section Cut ~ 0,290
4.5" 12.6#,L-80,NSCT
Solid Liner
9,750
10,950
IProposed 2 7/8" Cemented LinerI
Proposed Whipstock 10,424'
IProposedCast Iron Bridge Plug 10,500'
I Top Perf 10,890
6"x4.5" CTC Packer ~ 0,953
Baker IBP top fishing neck I 1,495
.~ement sheath ~11,500
around slotted liner~ 1,511
PBTD 111,667
4.5",12.6#,13CR ~11,667
Slotted Liner
Comments on E-15b abandonment & sidetrack prep
Blair, May 4, 1999
The attached abandonment procedure for E-15b does not follow precisely the
procedures described in the regs but is consistent with some earlier work and
makes sense to me.
The entire existing producing interval ofE-15a is essentially horizontal. There is
no interest, from a reservoir management viewpoint, in cementing across this long
horizontal interval prior to drilling the new sidetrack. Our goals can be met by
setting a bridge plug above the existing perfs.
The plan I have submitted calls for setting a cast iron bridge plug above the
existing perfs and slotted liner and pressure testing this plug. The next step would
be to set the whipstock anchor, which is a solid plug itself, just above the CIBP.
This would provide two permanent plugs isolating the original horizontal
completion from the window for the new sidetrack.
The whipstock would then be stung into the whipstock anchor. After milling and
drilling, the sidetrack completion will be a fully cemented 2 7/8" liner with a
cement volume large enough to place 200 ft of cement above the window.
While this procedure differs a bit from what is described in the regs I believe it
makes both technical and economic sense for this type of sidetrack. To add
additional cementing to this horizontal well prep would add significant cost with
no benefit that I can see.
Please call if further info or discussion is needed.
Ted Stagg
CT Drilling Eng.
564-4694
Ga~ ~o~s. ~o
Anchorage
(.:i R / R 0 P ~ {/lO ~ 8723 -.-. 8965
G E/R 0 P ~ ~
(~. 'i0292-"1062'i
L I
Ar"e dr'y d'¥tch
A !" e
samp'i es r'.equi' r"ed? yes ~nd r"ece'¥ vect'?
0 I::i I I--I--I IM G S E I:IL~I ~-- E S
~LI~ 1~0~ TRANSMITrAL(~k,dt
To: State of Alaska
Alaska Oil and Gas Conservation Comm. /"
Attn.' Larry Grant
3001 Porcupine Dr.
Anchorage, Alaska 99501
January 04, 1996
MWD Formation Evaluation Logs - E-15A, E-15APB1, & E-15APB2 AK-MW-40093
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.'
Jun Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way,//G, Anchorage, AK 99518
E-15A:
1 LDWG formatted LIS tape with verification listing. API#: 50-029-20668-01
1 LDWG formatted LIS tape with verification listing, dA
~Nasl{~ Oi' ~,; co,'°r' 1996.
E-ISA PB2:
1 LDWG formatted LIS tape with verification listing. API#: 50-029-20668-71
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252
A Dresser Industries, Inc. Company
I
-'//- '7!-.
WELL LOG TRANSMITTAL
To: State of Alaska March 2, 1995
Alaska Oil and Gas Conservation Comm.
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - E-15A
The technical data listed below is being submitted herewith. Direct any problems or concerns to
the attention of:
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
2" x 5" MD Gamma Ray Logs:
2" x 5" TVD Gamma Ray Logs:
1 Bluelines
1 Rev. Folded Sepia
1 Bluelines
1 Rev. Folded Sepia
RECEIVED
MAR O$1995
Alaska Oil & Gas Cons, Commission
Anchorage
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
STATE OF ALASKA
ALASKAOIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
BP ExpIoration 94-134
3. Address 8. APl Number
P. 0. Box 196612, Anchora~le, Alaska 99519-6~12_] /r~ ! ,,, 50-
029-20668-01
4. Location of well at surface '~.~~_.~(( . . 9. Unit or Lease Name
903' SNL, 501' WEL, SEC. 6, T11N, R14E i: ;~;-"v'~" '"~-._.~ / ,~ , t ~' Prudhoe Bay Unit
At Top Producing lnte rval ~/~ ~X~;- V~--~~ :~L ~.).-~ [ 10. Well Nu mb er
! ....... ~ E-15A (42-1-11-13)
, , ~ ....... ~
2005 SNL, 214 WEL, SEC. 1, T11N, R13E ! ~? !~" ~ ~'~ ~--~"//J'][ 11. Field and Pool
~ .. -: '-:; ;;~'. ; Prudhoe Bay FielcYPrudhoe Bay Pool
2330' SNL, 1063' WEL, SEC 1, T11N, R13E
5. Elevation in feet (indicate KB. DF, etc.) 6. Lease Designation and Serial No.
KBE = 65.04' ADL 28280
12. Date Spudded11/30/94 13. Date T.D. Reached12/11/94 14' Date C°mp" Susp' °r Aband' 115' Water Depth' if °ffsh°re 116' N°' °, C°mpleti°ns12/19/94 N/A feet MSL One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 121. Thickness of Permafrost
11684' MD/8990' TVD 11667' MD/8990' TVD YES [] NO [] 2076' feet MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
LWD
23. CASING, LINER AND CEMENTING RECORD
SEFRNG DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BO'I-I'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" X 30" Insulated Conductor Surface 110' 36" 8 cu yds Concrete
13-3/8" 72# L-80 Surface 2671' 17-1/2" 3720 cu ft Arcticset II
9-5/8" 47# L-80 Surface 9872' 12-1/4" 1415 cu ft "G'Y130 cu ft AS I
7" 26# L-80 9381' 10290' 8-1/2" 468 cu ft Class "G"
4-1/2" 12.6# L-80/13CR 9736' 11667' 6" 162 cuft Class "G"
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD/ PACKER SET (MD)
Slotted Liner 4-1/2", L-80 9689' 9626'
10988'-11655' MD External csg. pkr. @ 10953'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
,27. PRODUCTION TEST
iDate First Production Method of Operation (Flowing, gas lift, etc.)
12/28/94 Flowing
Date of Test Hours Tested =RODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO
TEST PERIOD ~
I
;Flow Tubing Casing Pressure 3ALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAViTY-APl (corr)
Press. 24-HOUR RATE j~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
R-E( £1VED
FEB -7 1995
Alaska Oil & Gas Cons. Commission
Anchorac~,
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
.. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Subsea
Top Zone 1 B 10718' 8878'
R£¢£1VED
FEB - 7 199,5
.& Gas Cons. Commission
31. LIST OF A'FFACHMENTS ' ': ~l~l¢~lor~!'R
32. i hereby certify that the foregoing is true and correct to the best of my knowledge
Signed /~~ /~'~ TitleDrilling£ngineerSu~ervisor Date'~'¢'~''f ~
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: E-15A
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 11/18/94 10:00
SPUD:
RELEASE:
OPERATION:
DRLG RIG: DOYON 14
WO/C RIG: DOYON 14
11/19/94 ( 1)
TD:10500
PB:10500
11/20/94 ( 2)
TD:10500
PB:10500
11/21/94 ( 3)
TD:10500
PB:10500
CIRC OUT DIESEL
MW: 0.0
HANDED OUT 2 STOP CARDS. HELD TWP SFTY MTGS. HELD A PRESPUD
MTG. & DISCUSSED THE REVISED CH. 7. & GLYCOL SPILL.
ACCEPTED THE RIG @2200 HRS ON 11/18/94.
CANTILEVER RIG FLOOR BACK. MOVE, SPOT & SHIM RIG OVER WELL
#E-15A. CANTILEVER RIG FLOOR OVER HOLE. HOLD PRE-SPUD MTG.
SPOT SLOP TANK WHILE TAKING ON SEAWATER. RU LUB. & PULL
BPV. RU & CIRC OUT 140 BBLS DIESEL, CIRC WELL.
LD 7" TBG MW: 0.0
NO STOP CARDS. HELD 2) SFTY MTGS.
CIRC WELL & RD CIRC LINES. SET BPV. ND TREE ASSY & NU BOPE.
CHANGE RAMS F/3.5 T/5", HOOK UP FLOW LINE & CHK CLINE.
TEST BOPE T/5000~. RU T/PULL 7" TBG. PULL T/275 - 300K &
SHEAR @320K. LD 12 X 7 TBG HNGR. CBU. LD 7" 26# IJ4S L-80
W/26 RUBBER CLAMPS ON CL. & SSSV. NO PIPE DAMAGE SEEN @50'.
SWEDGING CASG
MW: 0.0
2 STOP CARDS. 2 SFTY MTGS.
FINISH LD 7" 26# IJ4S L-80 TBG. 241 JTS. & RD TOOLS. RU &
TEST BOPE. J. SPAULDING W/AOGCC WAIVED WITNESS OF BOPE
TEST. 5" RAMS LEAKED. CHANGED & RE-TEST T/5000. OK. RIH
W/5' DP T/2056. RU T/CBU. CIRC HOLE RD. POOH F/SWEDGE
ATTEMPT. PU 8.5" SWEDGE & OIL JAR. RIH T/77' & CIRC. CHK
TIGHT SPOT F/HYDRATES WHILE CIRC. NO SUCCESS. MU 10) 6.75"
DC'S, JARS & 2 STNDS DP. CIRC HOLE @ 10BPM W/125 DEGREE
SEAWATER @521'. STAND BACK 2 STNDS DP & MU 8.25" SWEDGE, 3)
8" DC-10' PUP. TAG COLLAPSED SPOT @77' SWEDGE T/86' & WORK
SAME. CHANGE SWEDGE T/8-3/8". SWEDGE 9-5/8" CASG T/8-3/8"
ADDED 4TH 8" DC & WORK THRU SAME SPOT 9', F/77' T/86'
TAKING 20000 LBS T/GET BACK THROUGH SPOT.
WELL : E-15A
OPERATION:
RIG : DOYON 14
PAGE: 2
11/22/94 ( 4)
TD:10500
PB:10500
11/23/94 ( 5)
TD:10500
PB:10500
11/24/94 ( 6)
TD:10500' (3081)
11/25/94 ( 7)
TD:10500' ( 0)
SWEDGING 9 5/8" CSG MW: 0.0
SWEDGING OUT 9 5/8" CSG F/ 77 - 86' W/ 8 3/8" SWEDGE. CIRC
125 DEG SEAWATER @ 372'. PIC UP STAND OF 8" DC'S AND WORK
SWEDGE THROUGH TIGHT SPOT F/ 84 - 86' CHANGE SWEDGE TO
8.5" ABD SWEDGING @ 81 - 86'. LAY DOWN 2 8" DC, MAKE UP
SURFACE JARS AND JAR THROUGH F/ 81 - 86'. STAND BACK 9 6
3/4" DC AND PICK UP 8 5/8" SWEDGE. JAR AND SWEDGE F/ 81 -
84' CHANGE OUT OIL JARS, OLD ONE QUIT WORKING. JAR AND
SWEDGE F/ 81 - 85', TIGHT JARRING OUT. CHANGE OUT SWEDGES
F/ 8 5/8" TO 8 1/2" AND JAR AND SWEDGE F/ 84 - 86'. STAND
BACK BHA AND TEST CSG, OK. JAR THROUGH TIGHT SPOT F/ 84 -
86' W/ 8 1/2" SWEDGE. CHANGE OUT SWEDGE F/ 8 1/2" TO 8
5/8" SWEDGE AND JAR ON SAME F/ 77 - 86'.
RIH W/ 8.5" MILL MW: 0.0
JARRING AND SWAGING W/ 8 5/8" SWAGE F/ 81 TO 86'. PULL
100K OVER COMING BACK THRU. LAY DOWN SURFACE JARS AND 8"
DC'S, CHANGE SWAGE TO 8 1/2", PU 6 3/4" DC. RIH TO 1829'.
CIRC WELL. TEST CSG TO 3500#, OK. POH. LAY DOWN ALL
SWAGING TOOLS AND PICK UP SLICK STICK RET. TOOLS. RIH TO
5000' SLM. CUT DRLG LINE. RIH PICKING 5" DP OFF RACK.
TAG AND ENGAGE FISH @ 9303'. CBU. CHECK F/ FLOW, POH W/
FIHS. LAY DOWN FISH AND CHANGE BHA. RIH 8.5" MILL TOOK 10,
000 WT. GOING THRU BAD SPOT IN CSG.
POOH W/PKR
MW: 0.0 VIS: 0
CON'T RIH TRI-STATE MILL & PRT T/9321. LATCH ON TO PKR.
MILL ON PCKR F/9321 UNTIL IT RELEASED & PUSHED PKR DOWN
HOLE T/9381. CBU & CLEAR BORE HOLE OF GAS BUBBLE. CHK
F/FLOW. POOH TIGHT @ 4450 & 3050. LOST THE PKR. NO DRAG THE
REST OF THE WWAY OUT. NO TIGHT SOPT 80'+. MU TRISTATE SPEAR
DRESSED W/4.805" GRAPPLE & RIH T/9383. TAG & ENGAGE FISH.
CHK F/FLOW POOH 10 STNDS W/FISH.
CHANGE OVER T/MILL FL.
MW: 0.0 VIS: 0
CON'T POOH W/SPEAR-NO RECOVERY. WAIT ON TOOLS F/TRISTATE.
MU 4.5" MILL ON SPEAR. RIH PU KELYY. ENGAGE FISH @9383.
POOH SLOWLY - FISH HANGING UP ON CASG COLLARS. LD FISHING
TOOLS. UNABLE T/REMOVE SPEAR F/FISH. LD SAME. RU TBG EQUIP.
& LD TAIL PIPE. RIH W/6.75" DC'S & LD. PU 6" BIT & 6.75"
DC'S. PU 40 JTS OF 3.5" 15.5# DP & RIH. SLIP & CUT 59.5'
DL. RIH T/10479 & TAG CMT. C/O CMT F/10479-10500. REV CIRC.
UNPLUG JET. CIRC & CHANGE OVER T/MILLING FLUID.
WELL : E-15A
OPERATION:
RIG : DOYON 14
PAGE: 3
11/26/94 ( 8)
TD:10345' ( 0)
11/27/94 ( 9)
TD:10340' ( 0)
11/28/94 (10)
TD:10340' ( 0)
11/29/94 (11)
TD:10340' ( 0)
CIRC HOLE CLEAN
MW: 0.0 VIS: 0
CON'T T/CHANGE OVER T/MILLING FLUID @10500. 7" SECTION
PLANNED. F/10300 T/10350. FLOW CHECK. PULL 10 STNDS FLOW
CHK. STAND BACK 3.5" 15.5# DP F/CMT. MU 7" 5500 MILLMASTER
SECTION MILL BHA. RIH T/10290/ START MILL @10290 T/10345.
POOH W/SECT. MILL
MW: 0.0 VIS: 0
CBU & CLEAN 7" SECT. F/10290 T/10340. 50' WINDOW.
RECOVERED 57% OF IRON. 735 LBS. CHK F/FLOW PULL 10 STNDS.
CHECK F/FLOW. POOH. FOUND KNIVES WORN OUT ON 1
SIDE-INDICATES THAT THE TOOL HAD NOT CUT OUT. NO WEAR ON
BTTM OF BLADES. LD SECTION MILL. PU #2. RIH & CIRC @9381/7"
LINER TOP. RIH T/10292. START CUT OUT T/10309. UNABLE T/GET
BACK IN 7" @ 12290. ROTATE JAR & WORK PIPE TILL THE KNIVES
CLOSED. DRAG UP T/320K THRU 7" HNGING UP ON EACH CASG
CONNECTION WHILE POOH.
POOH W/SECTION MILL
MW: 0.0 VIS: 0
CON'T. POOH W/7" SECTION MILL #2. KNIVES BENT & FLOW TELL
HAD MOVED UP. REDRESS #1 & NEW TOP SUB JETTED W/1-12/32
1-14/32. RIH W/7" 5500 MILLMASTER SECT. MILL. BREAK CIRC
@9400. CON'T RIH T/10304. OPEN KNIVES @10304 & REAM
T/10309. TAG UP CUT SECT. GOOD PARTICAL SIZE. APPEARS T/BE
CUTTING THE FULL 7" AFTER COLLAR @10317. 120SPM @ 3000 PSI.
510 GPM. TOTAL RECOVERY 107% OR 1391 LBS. CIRC & CLEAN
HOLE. CHK F/FLOW. PULL 10 STNDS. CON'T CHK F/FLOW. WHILE
POOH. NO PROBLEMS. LD BHA.
C/O PCKOFF & TBG SPOOL
MW: 0.0 VIS: 0
CLEAR FLOOR OF MILLING TOOLS. KNIVES SHOW NORMAL HOOK WEAR
F/CUTTING 7" CASG. PU 3.5" MULE SHOE ON 40 JTS OF 3.5" DP.
STINGER. RIH ON 5" DP T/7978. SLIP & CUT 59.5' DL & CIRC.
RIH T/10495. CIRC FULL CIRC LONG WAY 12 BPM @2500. PULL 1
STND. T/10400. REV. CIRC, WHILE STARTING BATCH MIX, HAD
CHEMICAL PROBLEM/CMT MIXING WATER. DUMP CHEMICALS. RESTART
BATCH MIXING. PUMP 20 BBLS WATER TEST LINES T/2500. OK.
PUMP 18 BBLS CMT FOLLOW W/5BBLS WATER. DISPLACE W/MUD 155
BBLS W/RIG PUMP T/BAL. CIP @17:52 HRS. PULL 10 STNDS. CIRC
PIPE VOL. @12 BPM @2500. PRESS UP ON CMT T/2000. LOST 250 #
IN 30 MIN. EST TOP OF CMT @10075 W/7" WINDOW @10290
T/10340. POOH STAND BACK 80 STNDS OF 5" DP. LD 57 JTS OF 5"
& STND BACK 3.5" DP. FLUSH BOP'S T/REMOVE ANY METAL
CUTTINGS W/BOP WASHING TOOL. RIH W/12 STNDS 5" DP. PU HOWCO
9-5/8" STORM PCKR & SET 6' BELOW BASE FLANGE. ND BOP'S @
TBG SPOOL. REMOVE & CHANGE 9-5/8" PACKOFF & REPLACE TBG
SPOOL.
Gas Cons. (~ommissio.
Anchor~ ~
WELL · E-15A
OPERATION:
RIG : DOYON 14
PAGE: 4
11/30/94 (12)
TD:10307' ( 0)
12/01/94 (13)
TD:10424' ( 117)
12/02/94 (14)
TD:10528' ( 104)
12/03/94 (15)
TD:10581' ( 53)
SIDE TRACK @10295
MW: 0.0 VIS: 0
CONTINUE T/CHANGE OUT 9-5/8" PACKOFF. INSTALL NEW TBG
SPOOL. TEST PACKOFF T/5000/15-MIN. OK. NU BOP'S. RETRIEVE
STROM PACKER & POOH W/5" DP. SET TEST PLUG & TEST BOP'S &
MANIFOLD T/5000. HYDRIL T/2500. CHK ACCUMULATOR, PULL TEST
PLUG & SET WEAR BUSHING. PU 6" BIT & RIH. BREAK CIRC @6250,
RIH T/10008. C/O CMT PU KELLY @10008. TAG SOFT CMT @10175.
FIRM UP 10270. K/O T/10295'. WINDOW 10290 T/10340. ORIENT
DRILL 30 DEG. T/LEFT OF HI SIDE OF HOLE & TIME DRIL @ 2FPH
T/10307.
MU NEW BHA
MW: 0.0 VIS: 0
1 STOP CARD. 2) 5-MIN SFTY MTGS. 1 BOP DRILL. 48 SEC. SHUT
IN.
TIME DRLG F/10307 T/10340. DIRECTIONAL DRLG & SURV. F/10340
T/10424. CIRC. HOLE CLEAN. F/MUD CHANGEOVER. PHASE 2
WEATHER COND. TRUCKS WERE LATE. DISPLACE WELL W/FLO-PRO MUD
@ 9.0 PG. CHK F/FLOW. PULL 5 STDS. DP CHECK F/FLOW. POOH.
PULL MWD PROBE. PULL WEAR RING & INSTALL TEST PLUG. CHANGE
TOP PIPE RAMS T/3.5" X 6 VARIABLE & TEST SAME T/5000. PULL
TEST PLUG & INSTALL WEAR RING. SET F2000S MOTOR @2 DEGREES.
RIH W/BIT #3
MW: 0.0 VIS: 0
RIH W/BIT & BHA #2. TEST MOTOR & MWD. PU KELLY & WASH 70'
T/BTTM. DIRECT. DRLG & SURV F/10424 T/10528. HI TRQ/LO
PENETRATION. CHK F/FLOW. PULL 5 STNDS. CHK. F/FLOW. POOH &
LD JARS. MU 8>5" SHOE. 18" LONG. JARS & STAND OF HWDP. RIH
T/79'. STACK OUT W/ALL & LD. MU NEW BHA, PU NEW JARS & RIM
W/BIT #3.
RIH W/BIT #4
MW: 0.0 VIS: 0
CON'T RIH T/8000. SLIP & CUT DL 60'. RIH & CAUTION WASH 50'
T/BTTM. NO FILL. DRLG & SURV F/10528 T/10581, SLIDING. CHK
F/FLOW & PULL 5 STNDS. CHK F/FLOW OK. RIH T/10050. PU KELLY
& MAD PASS F/10050 T/10100. POOH F/NEW BIT & BHA. CHANGE
BHA & PU NEW MOTOR SET @ 2.5 DEGREE. RIH W/NEW BIT # 4 &
BHA.
RECEIVED
FEB -? 1995
Oil & Gas Cons. Commission
Anchom,. ~
WELL : E-15A
OPERATION:
RIG : DOYON 14
PAGE: 5
12/04/94 (16)
TD:10090' ( 0)
12/05/94 (17)
TD:10290' ( 200)
12/06/94 (18)
TD:10311' ( 21)
12/07/94 (19)
TD:10546'( 235)
12/08/94 (20)
TD: 10895' ( 349)
12/09/94 (21)
TD:l1561' ( 666)
REV. CIRC
FfW: 0.0 VIS: 0
WASH 50' T/BTTM. LOST 500~ PP. NO FURTHER LOSS, PRESUME A
LOST JET. DRLG & SURV F/10581 T/ 10621. PUMP
FLUCTUATING-WOULD NOT DRILL AFTER 40' 10 MIN FLOW CHK.
PULL 5 STNDS. 10 MIN FLOW CHK. POOH-BIT, BTTM SECTION OF
MOTOR & ROTOR LEFT IN HOLE. PU/MU & LD 5.75" DBL BSKT
OVERSHOT W/BUMPER SUB & OIL JARS. MU MULE SHOE & RIH OE. PU
DP OFF RACK. CIRC HOLE CLEAN WHILE BATCH MIXING CMT. MIX &
PUMP 22 BBLS. CMT KO PLUG. PULL 12-STNDS DP/PULL THE 1ST 6
SLOWLY.
POOH F/KO ASSY
MW: 0.0 VIS: 0
REV. CIRC. NO CMT. HOLD PRESS ON CMT, 500#, INCREASE
T/2000. NO BLEED OFF. POOH & LD 54 JTS. OF 5" DP. PULL WEAR
BUSHING, SET TEST PLUG, TEST BOPE 250 T/5000. WITNESSED BY
AOGCC. OK. MU BHA & RIH T/4000. CUT DL. CON'T RIH T/10035.
WASH F/10035 T/10063. DRLG FIRM CMT F/10063 T/10290. CBU.
FLOW CHK & POOH F/NEW BHA.
DRILLING
MW: 0.0 VIS: 0
FINISH POOH PU BHA. RIH FILL PIPE T/5600 & 8000. COULDN'T
GET MWD T/WORK UNTIL 8000' ON FILL UP. POOH T/CHK MWD.
CHANGE MWD. FOUND JUNK IN IMPELLAR ON PROBE. RIH & TEST MWD
@5000 & 8000. ORIENT & K/O F/10290 T/10311.
DRILLING
MW: 0.0 VIS: 0
DRILLING F/10311 T/10362. CHK F/FLOW. PULL 5 STANDS - CHK
F/FLOW. POOH F/NEW BIT & CHK BHA. RIH FILL PIPE EVERY 2500
& CHK MWD PULSE. CUT DL. FINISH RIH. WASH & REAM F/10290
T/10362. OUT OF GAUGE HOLE F/10328 T/10362. DRILLING &
SURV. F/10362 T/10546.
DRILLING 6" HRZNTL HOLE
MW: 0.0 VIS: 0
CON'T DIRECTIONAL DRILLING 6" HOLE F/10546 T/10577. CIRC
TILL HOLE WAS CLEAN. 10 MIN FLOW CHK. LD 8 JTS OF 5" DP.
FLOW CHECK, POOH F/MOTOR & BHA CHANGE. LD MWD PROBE.
THREADS UNDER DUMP VALVE WERE DAMAGED DURING CHANGE-OUT.
REPLACED MOTOR & ADJUSTED T/1-5/8 DEGREE, PU NMLC & ORIENT
TOOL. RIH T/10360. FILL PIPE EVERY 3000'. PU KELLY, MWD
SURVEY EVERY 30' F/10363 T/ 10570. F/DIRECTION.
DIRECTIONAL DRILLING 6" HORIZONTAL HOLE F/10577 T/10895.
DRILLING 6" HORZTL
MW: 0.0 VIS: 0
DRILLING 6" HORIZONTAL HOLE F/10895 T/11561. TOTAL OF 189'
OF SAMD. TOP OF SAND @ 11100.
WELL : E-15A
OPERATION:
RIG : DOYON 14
PAGE: 6
12/10/94 (22)
TD:10550' ( 0)
12/11/94 (23)
TD:10986' ( 436)
12/12/94 (24)
TD:11686' ( 700)
12/13/94 (25)
TD:11686' ( 0)
P/B. RIH.
MW: 0.0 VIS: 0
3 STOP CARDS. 2 SFTY MTGS W/STEVE WALLS. 1 BOP DRILL.
CON'T DRILLING 6" HORIZONTAL HOLE F/11561 T/11572. DRILLING
SHALE ONLY HAVE 189' OF POOR QUALITY SAND IN 14 P. WILL
PULL OUT & PLUG BACK. CHK FLOW. POOH F/PLUG BACK. STAND
3.5" HWDP & BHA. PU 3.5" MULE SHOE & 40 JTS. OF 3.5" DP.
RIH ON 5" DP. HOWCO PLUG CATCHER @9024. RIH T/11563. CIRC &
COND. HOLE WHILE BATCH MIXING CMT. MIX 225 SX OF CLASS G
CMT. BJ STANDARD KICK OFF PLUG 17PPG. PUMP 20 BBLS WATER,
TEST LINES T/3500. FOLLOW W/ 37.5 BBLS CMT. & KICKED WIPER
PLUG OUT W/5BBLS WATER. DISPLACED W/153 BBLS OF MUD.
SHEARED WIPER PLUG W/2500 PSI. SPOT CMT ON BTTM. TOP OF CMT
EST @10550. 10& EXCESS OF 6" HOLE. PULL 14 STNDS. CIP @
20:05 HRS. ON 12/9. CIRC & CLEAR PIPE @10170. CBU NO CMT.
POOH & LD 40 JTS OF 3.5" 13.3# G DP. SORT T/SHIP OUT ALL
13.3# DP. TEST BOP'S & MANIFOLD. MU BHA #1, BIT #8. RIH &
ORIENT TOOLS. CHK MOTOR. CON'T T/RIH. EST. TOP OF CMT
@10550'
DRILLING
MW: 0.0 VIS: 0
1 STOP CARD - 2 SFTY MTGS.
CON'T RIH W/BIT #8 ON KO BHA #1 T/2500. CIRC & TEST MWD &
MUD MOTOR, MWD FAILED, CHK RIG FLOOR CENSORS & POOH. CHANGE
OUT MWD SOURCE. CIRC, RIH T/2500. TEST MWD. OK. RIH. FILL
PIPE @7" SHOE/10290. LD 21 JTS OF 5". RIH T/SHOE. SLIP &
CUT 59.5' DL. RIH TAG CMT @10440.CO CMT F/10440 T/10600.
DIRECTIONAL TIME DRILL LOWSIDE KO 120 DEGREE RIGHT OUT OF
6" HOLE. F/10600 T/10986. SHOULD BE HORIZONTAL IN LOWER
SECTION OF 13 P SAND.
REACHED TD
MW: 0.0 VIS: 0
HELD 4 SFTY MTGS. 1 HOUR W/EACH CREW.
CONTINUED DIRECTIONAL DRILLING OFF KO PLUG F/10986 T/11684
TD. HORIZONTAL @11160 IN THE LOWER 13P SAND. 500' OF SAND.
CIRC & COND. HOLE @ TD. POOH & LD 159 JTS OF 5" DP. WILL
STAND BACK 50 STNDS F/MOVE.
REAM 6" HOLE
MW: 0.0 VIS: 0
CON'T T/LD 5" DP, 3.5" NMHW, MWD & MOTOR. PU 6" HOLE OPENER,
STAB, 2 LC, 3 PT ROLLER REAMNER, DC, STAB, PU 3.5" 15.5# E
& 3.5" 15.5# X 95. RIH T/10540. TOOK WT. REAM 6" HOLE
F/10540 T/11684. PLAN T/SPOT 40 BBLS PRO FLO ACROSS HRZTL
SECTION. & CHANGE OVER T/CLEAN SEA WATER. THIS SHOULD LOWER
HYDROSTATIC 317 PSI.
~6~ya IJ~ & G~s I~ons. Gommi~i~
WELL : E-15A
OPERATION:
RIG : DOYON 14
PAGE: 7
12/14/94 (26)
TD:11684' ( 0)
12/15/94 (27)
TD:11684
PB:11665
12/16/94 (28)
TD:11684
PB:11665
CIRC. TOP OF 4.5" LINER
MW: 0.0 VIS: 0
CONT. CIRC & PUMPING HI VIS SWEEP. SPOT 40 BBLS OF NEW
FLO-PRO ACROSS THE HRZNTL PRODUCTION ZONE. DROP 2" OD
RABBIT, POOH T/7" CASG SHOE @10290. CHANGE OVER T/SEAWATER
F/10290 T/SURFACE. LOWER HYDROSTATIC 317 PSI. POOH STAND
BACK 3.5" DP, LD 3.5" HWDP & REMAINING BHA, HOLE OPENER &
3-PT REAMER IN GOOD CONDITON. SLM IS OK. NO CORRECTION. RU
& RUN 17 JTS OF 4.5" 12.6# 13 CR NSCT SLOTTED, 4-1/2" X 20'
CTC OPEN HOLE INFLATABLE PACKER, 57 JTS OF 4.5" 12.6# L-80
NSCT SOLID LINER & TIW 7" X 4-1/2" LINER HANGER W/TIE BACK
SLEEVE. RUN 1 STND OF 3.5" DP. CIRC PIPE VOL. RUN 4.5"
LINER ON 3.5" DP T/10260. FILL PIPE EVERY 10 STNDS. PUMP
PIPE & LINER VOL. @ 7" SHOE 10290 & MU CMT HEAD. RUN 4.5"
LINER THRU OPEN HOLE T/11667. STUCK PIPE 17' OFF BTTM. CIRC
@3.5 BPM @700 PSI. DROP BTM PLUG. SET LINER HANGER, CTC
PACKER & OPEN HOWCO CMT'R. CIRC THRU CMT'R 6 BPM @1100 PSI,
BATCH MIX CMT. PUMP 20 BBLS 5% KCL WATER, TEST LINES
T/4000. FOLLOW BY 29 BBLS 134 SX CMT @ 15.8 PPG. KICK OUT
PLUG W/5 BBLS WATER. DISPLACE W/RIG PUMP @ 6 BPM 1100 PSI.
BUMPED PLUG W/3000 PSI. CIP @05:55 ON 12/13. RELEASE F/TIW
HANGER & CIRC.
MILLING ON PLUGS
MW: 0.0
PU & RELEASE F/PCKR & CIRC HOLE CLEAN. POOH F/MILLING
ASSY. LD 27 JTS DP. REPAIR HIGH TRANSMISSION DRIVE CHAIN.
POOH W/PKR RUNNING TOOL. LD RUNNING TOOL & MU 3-7/8" BIT-
3.5'' DRILEX MOTOR-16) 3-1/8" DC'S- 47 JTS OF 2-7/8" PAC DP.
RIH T/9650. CUT DL & TEST LINER TOP T/3500#. OK. CON'T
RUNNING IN HOLE & TAG @10492. DRILLING ON WIPER PLUGS
@10942. RUNNING 3000# WT. MOTOR STALLING OUT. USE ROTARY
@35 RPM & CUT 1.5'.
MILLING ON CMT.
MW: 0.0
DRILLING ON PLUGS IN CMT'R VALVE. POOH T/CHK MUD MOTOR &
BIT. LD 3-1/8" DC'S & CHANGE OUT MUD MOTOR & BIT. PU DC'S &
RIH T/1990. TEST MUD MOTOR PRESS T/3200 W/40 SPM. PRESS
T/EXCESSIVE. POOH T/CHK BIT & MOTOR EVERYTHING OK. CHANGE
MOTOR T/2-7/8" MOTOR. RIH T/1990. TEST MOTOR T/1800 PSI @
30 SPM. RIH T/10946. DRILLING ON PLUGS *& CMT @ 10946
T/10948.
SIGNATURE:
(drilling superintendent)
DATE:
Gas Cons. ~,omm%ss%on
SHARED SERVICES DRILLING
PBU/E-15A
500292066801
NORTH SLOPE
COMPUTATION DATE: 4/ 3/9
SPFr-~TY-SUN DRILLING SERVICES ........ PAGE 1
DATE OF SURVEY: 1 4 --~
MWD SURVEY
JOB NUMBER: AK-MW-40093 ·
KELLY BUSHING ELEV. = 65.04 FT.
5 OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
10200 8653.95 8588.91
10290 8725.68 8660.64
10320 8748.67 8683.63
10350 8769.96 8704.92
10380 8789.97 8724.93
37 19 N 89.20 W .00 943.99S 4179.08W 4284.28
36 58 N 89.29 W .40 943.27S 4233.43W 4337.05
43 0 S 85.30 W 23.19 944.00S 4252.67W 4355.95
46 35 S 80.40 W 16.62 946.66S 4273.62W 4376.96
49 42 S 76.40 W 14.33 951.17S 4295.50W 4399.29
10410 8808.92 8743.88
10440 8826.89 8761.85
10470 8843.75 8778.71
10500 8859.52 8794.48
10530 8874.00 8808.96
52 0 S 72.70 W 12.26 957.38S 4317.91W 4422.53
54 24 S 69.30 W 12.10 965.20S 4340.61W 4446.42
57 12 S 66.30 W 12.47 974.59S 4363.57W 4470.91
59 24 S 62.20 W 13.75 985.68S 4386.55W 4495.80
62 54 S 58.20 W 16.50 998.75S 4409.33W 4520.95
10541 8879.09 8814.05
10572 8892.11 8827.07
10600 8903.29 8838.25
10630 8915.43 8850.39
10660 8927.49 8862.45
64 18 S 56.80 W 16.40 1004.26S 4417.99W 4530.63
66 0 S 54.40 W 8.92 1020.14S 4441.17W 4556.81
66 10 S 57.85 W 11.46 1034.19S 4462.09W 4580.37
66 5 S 60.40 W 7.78 1048.26S 4485.63W 4606.49
66 48 S 64.20 W 11.77 1061.12S 4510.12W 4633.26
10690 8938.81 8873.77
10723 8949.71 8884.67
10753 8957.48 8892.44
10786 8964.48 8899.44
10819 8971.12 8906.08
68 54 S 67.10 W 11.35 1072.58S 4535.46W 4660.53
73 5 S 68.90 W 13.54 1084.42S 4564.80W 4691.79
77 5 S 69.10 W 13.24 1094.89S 4592.07W 4720.73
78 11 S 69.00 W 3.37 1106.33S 4621.94W 4752.41
78 24 S 69.50 W 1.62 1117.67S 4651.88W 4784.15
10849 8977.23 8912.19
10881 8982.92 8917.88
10911 8987.15 8922.11
10942 8990.29 8925.25
10974 8992.35 8927.31
78 18 S 69.10 W 1.33 1128.16S 4679.64W 4813.56
81 0 S 69.00 W 8.53 1139.30S 4708.74W 4844.43
83 0 S 69.00 W 6.59 1150.07S 4736.80W 4874.19
85 11 S 69.50 W 7.38 1160.84S 4765.23W 4904.33
87 26 S 70.40 W 7.53 1171.85S 4795.39W 4936.20
11005 8993.72 8928.68
11036 8995.09 8930.05
11067 8996.69 8931.65
11098 8998.58 8933.54
11128 8999.92 8934.88
87 34 S 70.10 W 1.03 1182.45S 4824.92W 4967.37
87 19 S 69.70 W 1.51 1193.07S 4853.93W 4998.02
86 44 S 69.60 W 1.94 1203.79S 4882.83W 5028.60
86 16 S 69.60 W 1.48 1214.60S 4911.89W 5059.36
88 39 S 70.00 W 7.94 1225.03S 4940.26W 5089.35
11160 9000.26 8935.22
11191 9000.00 8934.96
11222 8999.46 8934.42
11252 8999.27 8934.23
11283 8999.99 8934.95
90 7 S 71.00 W 5.57 1235.68S 4970.33W 5121.06
90 51 S 71.00 W 2.40 1245.74S 4999.53W 5151.77
91 8 S 72.00 W 3.36 1255.54S 5028.82W 5182.52
89 35 S 71.00 W 6.23 1264.89S 5056.78W 5211.87
87 45 S 70.40 W 6.19 1275.23S 5086.29W 5242.96
RECEIVED
APfl - 5 i995
Alaska Oil & Gas Coris. Commission
Anchor~. '
SPE~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU/E-15A
500292066801
NORTH SLOPE
COMPUTATION DATE: 4/ 3/9
DATE OF SURVEY: 121294
MWD SURVEY
JOB NUMBER: AK-MW-40093
KELLY BUSHING ELEV. = 65.04 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11314 9001.57 8936.53 86 22 S 70.30 W 4.50 1285.62S 5115.39W
11345 9003.28 8938.24 87 19 S 69.40 W 4.23 1296.31S 5144.54W
11376 9003.90 8938.86 90 24 S 68.60 W 10.15 1307.51S 5173.71W
11407 9003.69 8938.65 90 24 S 67.60 W 3.26 1318.95S 5202.16W
11438 9002.98 8937.94 92 11 S 67.80 W 5.82 1330.74S 5230.92W
5273.65
5304.47
5335.42
5365.72
5396.41
11470 9001.73 8936.69 92 18 S 67.30 W 1.59 1342.96S 5260.49W
11501 9000.52 8935.48 92 11 S 66.70 W 1.98 1354.94S 5288.72W
11532 8999.30 8934.26 92 18 S 66.80 W .46 1367.16S 5317.14W
11563 8998.05 8933.01 92 18 S 67.00 W .64 1379.37S 5345.77W
11594 8997.17 8932.13 91 0 S 66.80 W 4.27 1391.45S 5374.11W
5427.98
5458.18
5488.64
5519.29
5549.63
11625 8996.37 8931.33 91 54 S 66.70 W 2.86 1403.94S 5403.17W
11644 8995.75 8930.71 91 54 S 66.80 W .53 1411.30S 5420.31W
11684 8994.43 8929.39 91 54 S 66.80 W .00 1426.89S 5456.67W
5580.76
5599.13
5638.07
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5640.15 FEET
AT SOUTH 75 DEG. 20 MIN. WEST AT MD = 11684
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 256.90 DEG.
TIE IN POINT 10,200'
WINDOW POINT 10,290'
INTERPOLATED DEPTH 11,684'
TIED IN FROM E-15AST2 AT 10,572'
INTERPOLATED FROM 10290' TO 10530'
AZIMUTHS INCLUSIVE
SPEP-~-¥-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
PBU/E-15A
500292066801
NORTH SLOPE
COMPUTATION DATE: 4/ 3/95
DATE OF SURVEY: 121294
JOB NUMBER: AK-MW-40093
KELLY BUSHING ELEV. = 65.04 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
10200
11200
11684
8653.95 8588.91
8999.87 8934.83
8994.43 8929.39
943.99 S 4179.08 W 1546.05
1248.42 S 5007.33 W 2200.13 654.08
1426.89 S 5456.67 W 2689.57 489.44
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPEF~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
SHARED SERVICES DRILLING
PBU/E-15A
500292066801
NORTH SLOPE
COMPUTATION DATE: 4 / 3 / 95
DATE OF SURVEY: 121294
JOB NUMBER: AK-MW-40093
KELLY BUSHING ELEV. = 65.04
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
10200 8653.95 8588.91 943.99 S 4179.08 W 1546.05
10213 8665.04 8600.00 943.87 S 4187.54 W 1548.91 2.86
10342 8765.04 8700.00 945.91 S 4268.63 W 1577.91 29.01
10511 8865.04 8800.00 990.44 S 4395.08 W 1646.19 68.27
10789 8965.04 8900.00 1107.28 S 4624.42 W 1824.34 178.15
10820 8971.24 8906.20 1117.89 S 4652.47 W 1848.76 24.42
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
S~ERRY-SUN DRILLING SERVICES -- ~ PAGE
SHARED SERVICES DRILLING DATE OF SURVEY: 120594
PBU/E-15A ST MWD SURVEY
500292066870 JOB NUMBER: AK-MW-40093
NORTH SLOPE KELLY BUSHING ELEV. = 65.04 FT.
COMPUTATION DATE: 4/ 3/95 OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
10200 8653.95 8588.91 37 19 N 89.20 W .00 943.99S 4179.08W 4284.28
10295 8729.67 8664.63 36 58 N 89.29 W .38 943.23S 4236.45W 4339.98
10381 8796.93 8731.89 41 5 S 86.60 W 5.63 944.60S 4290.93W 4393.36
10443 8843.09 8778.05 43 22 S 83.90 W 4.67 948.09S 4332.69W 4434.82
10476 8866.46 8801.42 45 10 S 85.76 W 6.80 950.14S 4355.38W 4457.38
10488 8875.08 8810.04 45 22 S 85.26 W 3.33 950.82S 4364.06W 4465.99
10504 8886.36 8821.32 45 37 S 85.69 W 2.42 951.73S 4375.50W 4477.34
10537 8908.98 8843.94 45 42 S 85.46 W .57 953.51S 4398.58W 4500.22
10565 8928.75 8863.71 45 20 S 81.16 W 10.95 955.85S 4418.56W 4520.22
10621 8967.75 8902.71 45 20 S 81.16 W .04 961.92S 4457.56W 4559.58
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4560.17 FEET
AT SOUTH 77 DEG. 49 MIN. WEST AT MD = 10621
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 256.90 DEG.
TIE IN POINT 10,200'
WINDOW POINT 10,295'
INTERPOLATED DEPTH 10,621'
AZIMUTH IS INTERPOLATED AT 10,381'
RECEIVED
APR -- 5 1995
Alaska Oil & Gas Cons. Commission
Anchor~. ·
SPERRY-SUN DRILLING SERVICES
ANCHOILAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU/E-15A ST
500292066870
NORTH SLOPE
COMPUTATION DATE: 4/ 3/95
DATE OF SURVEY: 120594
JOB NUMBER: AK-MW-40093
KELLY BUSHING ELEV. = 65.04 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
10200 8653.95 8588.91
10621 8967.75 8902.71
943.99 S 4179.08 W 1546.05
961.92 S 4457.56 W 1653.25 107.20
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALAS KA
PAGE 3
SHARED SERVICES DRILLING
PBU/E-15A ST
500292066870
NORTH SLOPE
COMPUTATION DATE: 4/ 3/95
INTERPOLATED VALUES FOR EVEN 100
DATE OF SURVEY: 120594
JOB NUMBER: AK-MW-40093
KELLY BUSHING ELEV. = 65.04 FT.
OPERATOR: BP EXPLORATION
FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
10200 8653.95 8588.91 943.99 S 4179.08 W 1546.05
10213 8665.04 8600.00 943.87 S 4187.54 W 1548.91 2.86
10339 8765.04 8700.00 943.44 S 4264.11 W 1574.87 25.96
10474 8865.04 8800.00 950.03 S 4353.96 W 1609.54 34.67
10617 8965.04 8900.00 961.50 S 4454.85 W 1652.10 42.56
10621 8967.75 8902.71 961.92 S 4457.56 W 1653.25 1.15
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
SPERRY-SUN DRILLING SERVICES
SHARED SERVICES DRILLING
PBU/E-15A ST2
500292066871
NORTH SLOPE
COMPUTATION DATE: 4/ 3/95
DATE OF SURVEY: 121v~=
MWD SURVEY
JOB NUMBER: AK-MW-40093
KELLY BUSHING ELEV. = 65.04 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
10200 8653.95 8588.91
10290 8725.68 8660.64
10320 8748.67 8683.63
10350 8769.96 8704.92
10380 8789.97 8724.93
37 19
36 58
43 0
46 35
49 42
N 89.20 W .00 943.99S 4179.08W
N 89.29 W .40 943.27S 4233.43W
S 85.30 W 23.19 944.00S 4252.67W
S 80.40 W 16.62 946.66S 4273.62W
S 76.40 W 14.33 951.17S 4295.50W
4284.28
4337.05
4355.95
4376.96
4399.29
10410 8808.92 8743.88
10440 8826.89 8761.85
10470 8843.75 8778.71
10500 8859.52 8794.48
10530 8874.00 8808.96
52 0
54 24
57 12
59 24
62 54
S 72.70 W 12.26 957.38S 4317.91W 4422.53
S 69.30 W 12.10 965.20S 4340.61W 4446.42
S 66.30 W 12.47 974.59S 4363.57W 4470.91
S 62.20 W 13.75 985.68S 4386.55W 4495.80
S 58.20 W 16.50 998.75S 4409.33W 4520.95
10541 8879.09 8814.05
10572 8892.11 8827.07
10603 8904.75 8839.71
10635 8917.64 8852.60
10666 8929.81 8864.77
64 18
66 0
66 13
65 51
67 28
S 56.80 W 16.40 1004.26S 4417.99W
S 54.40 W 8.92 1020.14S 4441.17W
S 58.26 W 11.33 1035.96S 4464.91W
S 58.58 W 1.46 1051.15S 4489.62W
S 61.02 W 8.98 1065.33S 4514.00W
4530.63
4556.81
4583.52
4611.03
4637.99
10698 8941.12 8876.08
10728 8950.49 8885.45
10758 8958.79 8893.75
10789 8967.28 8902.24
10819 8975.53 8910.49
71 5
73 36
74 9
73 58
73 57
S 61.05 W 11.32 1079.81S 4540.17W
S 61.74 W 8.43 1093.91S 4566.02W
S 60.83 W 3.45 1107.71S 4591.21W
S 61.11 W 1.07 1122.13S 4617.20W
S 60.77 W 1.09 1136.08S 4642.30W
4666.75
4695.13
4722.79
4751.37
4778.98
10851 8984.36 8919.32 73 44
10882 8992.45 8927.41 76 27
10913 8998.67 8933.63 80 17
10944 9002.83 8937.79 84 24
10976 9005.64 8940.60 85 14
S 60.43 W 1.24 1151.04S 4668.85W
S 60.66 W 8.67 1166.00S 4695.35W
S 62.33 W 13.50 1180.42S 4721.89W
S 63.07 W 13.37 1194.60S 4749.38W
S 64.10 W 4.25 1208.43S 4777.22W
4808.23
4837.43
4866.55
4896.54
4926.79
11007 9008.16 8943.12
11038 9010.64 8945.60
11070 9013.03 8947.99
11101 9015.03 8949.99
11131 9016.54 8951.50
85 28
85 33
85 45
86 42
87 36
S 65.11 W 3.33 1221.74S 4805.24W
S 65.10 W .23 1235.02S 4833.86W
S 65.29 W .90 1248.22S 4862.44W
S 64.98 W 3.27 1261.05S 4890.11W
S 65.31 W 3.15 1273.85S 4917.73W
4957.10
4987.98
5018.81
5048.67
5078.47
11162 9017.65 8952.61
11192 9018.39 8953.35
11225 9018.98 8953.94
11255 9019.20 8954.16
11282 9018.65 8953.61
88 20
88 49
89 6
90 3
92 18
S 65.67 W 2.61 1286.78S 4946.10W
S 65.76 W 1.66 1299.14S 4973.50W
S 64.81 W 3.03 1312.78S 5003.14W
S 63.94 W 4.22 1325.98S 5030.65W
S 64.18 W 8.56 1337.49S 5054.31W
5109.04
5138.53
5170.48
5200.26
5225.92
RECEIVED
APR - 5 ]995
~taska Oil & Gas Cons. Commission
Anchor~. ,
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU/E-15A ST2
500292066871
NORTH SLOPE
COMPUTATION DATE: 4/3/9
DATE OF SURVEY: 121094
MWD SURVEY
JOB JMBER: AK-MW-40093
KELLY BUSHING ELEV. = 65.04 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11314 9017.00 8951.96 93 39 S 65.08 W 5.07 1351.17S 5083.16W
11344 9016.12 8951.08 89 37 S 64.75 W 13.24 1364.07S 5110.73W
11375 9016.82 8951.78 87 45 S 63.71 W 6.95 1377.45S 5138.44W
11407 9017.58 8952.54 89 30 S 62.02 W 7.62 1392.00S 5166.83W
11438 9017.25 8952.21 91 43 S 63.52 W 8.67 1406.09S 5194.20W
5257.12
5286.90
5316.91
5347.87
5377.72
11472 9016.18 8951.14 91 54 S 63.22 W 1.03 1421.30S 5224.54W
11502 9014.83 8949.79 93 15 S 65.45 W 8.66 1434.32S 5251.64W
11529 9013.40 8948.36 92 47 S 64.56 W 3.68 1445.80S 5276.26W
11572 9011.33 8946.29 92 47 S 64.56 W .05 1464.04S 5314.61W
5410.72
5440.06
5466.65
5508.13
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 5512.58 FEET
AT SOUTH 74 DEG. 35 MIN. WEST AT MD = 11572
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 256.90 DEG.
TIE IN POINT 10,200'
WINDOW POINT 10,290'
INTERPOLATED DEPTH 11,572'
INTERPOLATED FROM 10,320' TO 10530'
AZIMUTHS INCLUSIVE
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
SHARED SERVICES DRILLING
PBU/E-15A ST2
500292066871
NORTH SLOPE
COMPUTATION DATE: 4/ 3/95
DATE OF SURVEY: 121094
JOB NI/MBER: AK-MW-40093
KELLY BUSHING ELEV. = 65.04 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
10200 8653.95 8588.91
11200 9018.54 8953.50
11572 9011.33 8946.29
943.99 S 4179.08 W 1546.05
1302.09 S 4980.04 W 2181.46 635.42
1464.04 S 5314.61 W 2560.67 379.21
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
SHARED SERVICES DRILLING
PBU/E-15A ST2
500292066871
NORTH SLOPE
COMPUTATION DATE: 4/ 3/95
DATE OF SURVEY: 121094
JOB NUMBER: AK-MW-40093
KELLY BUSHING ELEV. = 65.04 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
10200 8653.95 8588.91 943.99 S 4179.08 W 1546.05
10213 8665.04 8600.00 943.87 S 4187.54 W 1548.91 2.86
10342 8765.04 8700.00 945.91 S 4268.63 W 1577.91 29.01
10511 8865.04 8800.00 990.44 S 4395.08 W 1646.19 68.27
10781 8965.04 8900.00 1118.37 S 4610.38 W 1816.65 170.46
11572 9011.33 8946.29 1464.05 S 5314.61 W 2560.67 744.03
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
THRU:
David John~"',
Chairmarf..~7
Blair Wondzell, ~'~~¢,~,~
P. I. Supervisor
FROM: Lou Grimaldi?°'~ SUBJECT:
Petroleum Inspector
DATE: December 4, 1994
FILE NO: AHGJLDBD.DOC
BOP Test Doyon rig 1/14
BPX well # E-15
Prudhoe Bay field
PTD # 94-134
Sunday, December 4, 1994: I traveled to Doyon rig #14 to witness the weekly BOP
test on their rig which is presently drilling BPX well # E-15 in the Prudhoe Bay Field.
The rig was still coming out of the hole when I arrived. The test once staded went very
well with all components functioning properly and holding their pressure test. The test
lasted 2.5 hours with no failures observed. I found the rig to be in very good condition.
Mark Egholm (Doyon Toolpusher) showed foresight in scheduling this test as it was not
due for two more days. The rig was standing by for cement to cure and this test was
performed as to give them a solid week of drilling without interuption.
Summary: I witnessed the weekly BOP test on Doyon rig #14. Test time 2.5 hours. No
failures.
Attachment: AHGJLDBD.XLS
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg:
Drlg Contractor:
Operator:
Well Name:
Casing Size:
Test: Initial
X Workover:
DOYON Rig No. 14 PTD #
BPX Rep.:
E-15 Rig Rep.:
Set @ Location: Sec.
Weekly X Other
DATE: 12/4/94
94-134 Rig Ph.# 659 - 4510/fax 4512
Dink Heirn
Mark Egholm
6 T. 11N R. 14E Meridian U
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
Reserve Pit N lA
Well Sign OK
Drl. Rig OK
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Test
Quan. Pressure P/F
I 500/3000 P
I 250/5000 P
I 250/5000 P
I 250/5000 P
3 250/5000 P
2 250/5000 P
3 250/5000 P
MUD SYSTEM: Visual Alarm
Trip Tank OK OK
Pit Level Indicators OK OK
Flow Indicator OK OK
Gas Detectors OK OK
Test
FLOOR SAFETY VALVES: Quan. Pressure
Upper Kelly /IBOP 1 1250/5000
Lower Kelly / IBOP 1 1250/5000
Ball Type 1 J25o/5ooo
Inside BOP I 1250/5000
P/F
P
P
P
P
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
14
Test
Pressure
250/5000
36 250/5000
1
P/F
P
P
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure 0
System Pressure Attained 2
Blind Switch Covers: Master:
Nitgn. Btl's: 4 ~ 2000
3,000 P
1,700 P
minutes 53 sec.
minutes 56 sec.
YES Remote: YES
Psig.
Number of Failures: 0 ,Test Time: 2.5 Hours. Number of valves tested 26 Repair or Replacement of Failed
Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS: GOOD TEST
Distribution:
orig-Well File
c - Oper./Rig
c ~ Database
c - Trip Rpt File
c -Inspector
FI-021L (Rev. 7/19)
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
AHGJLDBD.XLS
Louis R Grimaldi
CONSERVATION COMMISSION
ALASKA OIL AND GAS
ANCIIORAGE, ALASKA 99501-3192
PItONE: (907)279-1433
TELECOPY: (907)276-7542
October 17, 1994
Adrian Clark
Drilling Engineer Supervisor
BP Exploration (Alaska), Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit E-15A
BP Exploration (Alaska), Inc.
Permit No. 94-134
Sur. Loc. 903'SNL, 501'WEL, Sec. 6, TllN, R14E, UM
Btmnhole Loc. 2448'SNL, 987'WEL, Sec. 1, TllN, R13E, UM
Dear Mr. Clark:
Enclosed is the approved application for permit to redrill the above
referenced well.
The permit to redrill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given
to allow a representative of the Commission to witness a test of BOPE
installed prior to drilling new hole. Notice may be given by contacting
the Commission petroleum field inspector-on the North Slope pager at
659-3607.
~~a~r~R O~~F CO ~ISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
2O AAC 25.OO5
la. Type of work Drill [] Redrill I-Illb. Type of well. Exploratory[-] Stratigraphic Test [] Development Oil []
Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration ~ KBE = 67.06 feet Prudhoe Bay Field/Prudhoe
3. Address .. 6. Property Designation Bay Pool
P. 0. Box 196612. Anchorage. Alaska 99519-~612 ADL 28280
4. Location of well at surface . :-~ 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
903' SNL, 501' WEL, SEC. 6, T11N, R14E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
2091' SNL, 451' WEL, SEC. 1, T11N, R13E E-15A (42-1-11-13) 2S100302630-277
At total depth 9. Approximate spud date Amount
2448' SNL, 987' WEL, SEC. 1, T11N, R13E 10/19/94 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property 15. Proposed depth (MD andTVD)
property line
ADL 28304 feet No close approach feet 2560 11688' MD/9022' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 A^C 25.035 (e)(2))
Kickoff depth ~o3oo feet Maximum hole an~le89.~ o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length M D TVD MD TVD (include stage data)
6" 4-1/2" 12.6# L-80 NSCC 1793' 9250' 7905' 11043' 9012'
6" 4-1/2" 12.6# 13CR8O NSCC 650' 11043' 9012' 11688' 9022' 328 sx Class "G"
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary R ~ C ~,. IV ~ Ci
Total depth: measured 10805 feet Plugs (measured)
true vertical 9138 feet (.'~0'~- '1 0 ~99~
Effective depth: measured 10668 feet Junk (measured)
true vertical 9026 feet .,.~.!:._~!:~ ,;~',I & G.% (;oas. Co.rnmissio~
8 nr,hr~r
Casing Length Size Cemented Measured depth T/'ue Vertical depth
Structural
Conductor 110' 20"x30" 8 cu yds Concrete 139' 139'
S u rface 2642' 13-3/8" 3720 cu ft AS II 2671' 2671'
I n t e r m e d i at e 9843' 9-5/8" 1415 cu ft "G" & 98 72' 8389'
Production 130 cu ft AS I
Lin e r 1424' 7" 468 cu ft "G" 9381 '- 10805' 8007'-9138'
Perforation depth' measured 10565'-10590', 10600'-10650', 10660'-10668' (open) 10538'-10552' (squeezed)
true vertical 8860'-8965' TVD SS (four intervals
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program~
Drilling fluid program [] Time vs depth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[]
21. I hereby correCt__true and correct to the best of my knowledge
Signed Title Drilling Engineer Supervisor ~'~-~~ Date
Commission Use Only
Permit Number IAPI number IApproval date See cover letter
/O~Z_ //,.~ ~,4 150- 0.2..~-,2. C)~<~ ~--~/ I /~'~ _./q..- ~ t.f for other requirements
Condition§ of approval Samples required [] Yes [] No Mud Icg required []Yes ,ii] No
Hydrogen sulfide measures [] Yes ~ NO Directional survey requ~reo [] Yes [] No
Required working pressure for BOPE 1-12M; 1-13M; I~5M; I'-I10M; 1-115M;
Other: Original Signed By by order of
Approved by David W. Johnston Commissioner ~ne commission_ .Da!.e/.¢//_/?/~.~
Form 10-401 Rev. 12-1-85 Submit icate
Well Name:
E-15A
Redrill Plan Summary
IType of Redrill (producer or
iniector):
PRODUCER
Surface 902.77 FNL 500.74 FEL S6 T11N R1 4E UM
Location:
Target Location: 2091.48 FNL 451.09 FEL S1 T11N Rq 3E UM
Bottom Hole 2448.31 FNL 986.83 FEL S1 T11N R1 3E UM
Location:
AFE
Number:
4P8012
IRig: I
DOYON RIG #1 4
Estimated Start 1 90CT94
Date:
Operating days to
complete:
17
I'TVD: 9,022'
I KBE: 1~7.o~' I
Well Design (conventional,
slimhole, etc.):
HORIZONTAL SIDETRACK
J.Objective J SADLEROCHIT
Program:
A 9.5 - 1 0.00 ppg Biozan polymer water based mud will be used.
Special design IA NON-DAlVlAGING XANVIS POLYMER MUD AT 8.6-9.0 PPG
considerations I WILL BE USED TO DRILL THE 6" HOLE INTERVAL.
Depth Density PV YP INT IOMIN FL OIL I SOLIDS
(TVD) (PPG) (CP) (#/FT) GEL GEL cc30/min (%)I (%)
KOP' 9.0 12 40 10 20 6 0 5
to to to to to to to to to
TD' 9.0 12 40 10 20 6 0 5
Directional:
IKOP: ! 10,300'
Maximum Hole
Angle:
Close Approach
Well'
MD/8,731' TVD
89.1°
NONE
The above listed wells will be secured during the close approach.
Casing/Tubing Program:
Hole. Csg/ Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D. MD/TVD MD/TVD
6" 4-1/2_" 13CR- NSCC 650' 11043'/9012_' 11 688'/9022_'
80
6" 4-1/2" L-80 NSCC 1 793' 92_50'/7905' 11043'/901Z'
,, ,
TUBING 4-1/2." 12.6# L-80 TDS OR 9,200' SURFACE 9200'/7867'
BTC-MOD
.. ,
.
Cement Calculations:
Liner 4-1 / 2"
Size:
Basis:
above liner with DP.
Total Cement 3 Z8 i
Volume:
50% open hole excess, 80' shoe joint, 1 50' liner lap and 1 50' excess
sxs of Class G Blend 1.1 7. ft3/sx
ILiner
Size'
Basis:
I
I above liner with DP.
Total Cement !
Volume:
50% open hole excess, 80' shoe joint, 1 50' liner lap and 1 50' excess
sxs of Class G Blend 1.1 7. ft$/sx
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind shear rams,
and annular preventer will be installed and is capable of handling maximum
potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
SUMMARY PROCEDURE:
.
Z.
3.
4.
5.
6.
7.
8.
.
10.
ll.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Pre-rig work. RU slickline unit. WLIH and install a plug in the 4-1/2" XN nipple in the
+ ,
tailpipe at _9409 md'. WLOH. WLIH and punch circulating holes in the 7" tubing at
_+9270' md in the middle of the first full joint above the packer. WLOH and RD slickline.
Freeze protect tubing and annulus to 2000' md/tvd and set a BPV.
Move in drilling rig.
Pull BPV. Circulate diesel freeze protection cap from well and recover for future use.
Install a BPV and tree test plug. Remove the production tree.
Install BOP's and test to 5000 psi. Remove the test plug and BPV.
Shear SBR. Pull and lay down the 7'-- tubing.
Recover slickstick/anchor. Mill and retrieve packer.
Displace well to milling fluid. Cut a 50' section in the 7'__~' casing starting from about
+_IO.;~O0'MD.
RIH with 2-7/8", 8.7#, DSS tubing and lay a cement plug from PBTD across and above the
section up to -+9963' md. This plug will serve as both the abandonment plug and the kickoff
plug. Squeeze away approximately 5 bbl cement to abandon perforations leaving the top opf
cement before drilling out at -+10,100' md which is 200' above top of window.
Run in with an 4-3/4" steerable drilling assembly and a 6" bit with gamma ray/directional
MWD and dress the cement to 5' below the section top. Kickoff and if necessary displace well
to a clean FLO-PRO system. Continue to directionally drill to TD at +_11,688' md which
should yield _+644' of horizontal section (see attached directional plan).
Make a conditioning trip with a 6" hole-opener for the open hole section and with a 9-5/8"
casing scraper spaced to clean the casing.
Install a 4-1/2". 17_.6#. L-80. NSCT solid liner x 4-1/2". L-80 slotted liner with 4-
1/2" X 9-5/8" packer/hanger. Space packer / hanger to be set at _+9,2_75' md.
Cement the liner in place with the total cement volume based upon 50 % open-hole
enlargement plus the 80' shoe volume, 150' lap volume and 150' excess on top of the liner
with drillpipe in the hole. Set hanger, inflate CTC packer.
Re-test BOP's as needed.
RIH and cleanout
Displace well to seawater.
Run the 4-1/2" L-80 completion string assembly utilizing as much used 4-1/2" tubing as
possible. Space out and circulate with corrosion inhibitor.
Install a BPV and test plug. Remove BOP's.
Install and test the production tree to 5000 psi. Pull tree test plug and BPV.
Set packer.
Test the tubing x casing annulus to 3500 psi for 30 minutes.
Shear RP valve in the upper GLM and freeze protect the well.
Set a BPV. Release rig.
Complete appropriate documentation and hand-over to Production.
Prudhoe Bay Drilling
Prudhoe Bay Unit
E-PAD
E-~5A Wp8 (Medium
VERTICAL VIEW
sc~z ~o m/
VERTICAL SECTION REF: I~ELLI~Jd)
Radius)
HALLIBURTON
Target Name TVD NS EW Grid X Gold Y J
I
End oF Horz. 9022 1546 S 5374 W 659124 5974500
CRITICAL PDINT DATA
4331
36.97' E 1030O HD KO? / TIE IN / START OF CURVE R 1o.ooo/100 Fl
39.34' R 10330 HD
41,77' ~ 10360 MD
MD lnc Az;. TVD N/S E/~
KOP / TIE IN / 10300 36.97' 270.72' 8731 943 S 4236
START OF
CURVE ~
10.00'/100 Pt
PGOC 10546 57.81' 858.69' 8897 974 S 4411
ZONE 1 - lB 10655 67.69' ~47,4~' 8947 1007 S 450~
END DF CURVE 1082~ 83.07' 240.60' 8989 1078 S 4647
Star~ horz./ 10970 83.07' ~40.60' 9007 1150 S 4775
START DF
CURVE ~
10.00'/100 ~
END DF CURVE 11044 89,11' 836.35' 9012 1189 S 4838
End o? Horz. 11688 89.11' 236.35' 902~ 1546 S 5374
850 44,E7' E 10390 lid
~46.81' E ID4EO MD
k~4,.3,' , I0450 MD
~ 10 ilo MD -
~ ~]~ . ~ ~Li' e 10600 ~
a~~ ~~/~;-- - -~ . 67,69' i 10655 MD ~NE I - lB
~ ~ 10750 MD F v
BgB~ ......... 4764 .......... B~.D7' E 108~ ND [ND B C~ E
........... 559~
m
9100 {
4~0 41'00 41~0 4~'00
V'ER?ICAL S~CIION PL&~'E: 258.96
55'00 55~0 56'00
f,~oo
oo
oo
oo
§
els · ·
o o 000
. ~ /
. ~ - ~.
O GOreD0 64~00 63~00 6~Jo0 61moo 60iOO 59{00 58'00 57'00 56i00 55100 54100 53moo 5E~OO 51'00 5D'D0
PROPOSED BI-IL SURFACE LOCATION -"'
TVD 90:~2.06 Dote ' -- -- Verified By ' (~'~
MD 11687.96 ASP -- XI 664463.00
V~ 5591.79 Y. 5976160.99
N/S 1545.5o s Designed by ' $,:B~,5... Y,.o.g Certified By '
E/W 5373.97 W RKB Ft, 6%06
STATE OF ALASKA ,' ..
ALAr OIL AND GAS CONSERVATION COMMISSl
APPLICA"i FOR SUNDRY APPROVALS
1. Type of Request:
Abandon X Suspend ~ Operation Shutdown__ Re-enter suspended well__
Alter casing ~ Repair well __ Plugging X Time extension Stimulate __
Change approved program __ Pull tubing ~ Variance__ Perforate Other X
~ Plugbacl for redrlll
2. Name of Operator
BP Exploration
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
6. Datum elevation (DF or KB)
KBE = 60. 74' AMSL
5. Type of Well:
Development x
Exploratory __
Stratigraphic __
Service
10.
11.
7. Unit or Properly name
Prudhoe Bay Unit
4. Location of well at surface 8.
903'SNL, 501' WEL, SEC. 6, T11N, R14E
At top of productive interval
1848' SNL, 293' EWL, SEC. 6, T11N, R14E
At effective depth
1842' SNL, 61' WEL, SEC. 1, T11N, R13E
At total depth
1840' SNL, 147' WEL, SEC. 1, T11N, R13E
Well number
E-15 (42-01-11-13)
Permitnumber
81-151
APInumber
50- 029-20668
Field/Pool
Prudhoe Bay Field/Oil Pool
feet
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10805 feet
9138 feet
10668 feet
9026 feet
Plugs (measured)
Junk (measured)
Fill @ 10668' MD (4/89)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented
110' 20" x 30" 8 cu yds Concrete
2642' 13-3/8" 3720 cuft AS fl
9843' 9-5/8" 1415 cu f~ "G"/13o cuff AS I
1424' 7" 468cu fl C~ss"G"
measured 10565~10590; 10600~10650~ 10660'-10668'(Open)
10538'-10552'¢queezed)
true vedical 8860'-8965' TVD ss(four~tervals)
Tubing (size, grade, and measured depth) 7", L-80 ro 9293'; 4-1/2"tailpipe to 94.53'MD
Measured depth
True vertical depth
139' 139'
2671' 2671'
9872' 8389'
9381 '- 10805' 800 7'-9138'
0C1' 1 0 '~994
A~,¢~ 0il & Oas Cons. Commission
Anch0rcde
Packers and SSSV (type and measured depth) 9-5/8", Baker packer @ 9293'MD; 4-1/2" Otis SSSV @ 1999'MD
13. Attachments Description summary of prop. os&~
co m m e r~cing (~-ej'_aii~)n '/)-._.- -~ .... \~
14. Estimated date for x,,:~-/
16. If proposal was verbally approved
Name of approver
Date approved
Detailed operations program
BOP sketch
15. Status of well classification as:
Oil x Gas .. Suspended
Service
17. i hereby certify that the foregoing is true and correct to the best of my knowledge. '
Signed ~ .- '-, ~ .-- Title Drilling Engineer Supervisor ~t ~
' '~ ' FOR COMMISSION USE ONLY ~
Conditions of approval: Notify Commission so representative may witness J Ap~v~
I
Plug integrity__ BOP Test
Mechanical Integrity Test__
,...¢.
Approved by order of the Commission
Local/on clearance
SUbsequent form required 10-
Commissioner Date
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
WELL PERMIT CHECKLIST
PROGRAM: exp [] dev [] redrll ~ serv []
ON/O
ADMINISTRATION
, #
1. Permit fee attached .... ...............
2. Lease number appropriate ................
3. Unique well name and number ...............
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundary.
6. Well located proper distance from other wells ......
' 7. Sufficient acreage available in drilling unit ......
8. If deviated, is wellbore plat included .........
9. Operator only affected party ..............
10. Operator has appropriate bond in force .........
11. Permit can be issued without conservation order .....
12. Permit can be issued without administrative approval.
13. Can permit be approved before 15-day wait .......
ENGINEERING
15. Surface casing protects all known USDWs'
16. CMT vol adequate to circulate on conductor & surf csg.
17. CMT vol adequate to tie-in long string to surf csg . .
18. CMT will cover all known productive horizons ......
19. Casing designs adequate for C, T, B & permafrost ....
20. Adequate tankage or reserve pit .............
21. If a re-drill, has a 10-403 for abndnmnt been approved.
22. Adequate wellbore separation proposed ..........
23. If diverter required, is it adequate ...........
24. Drilling fluid program schematic & equip list adequate .~ N
25. BOPEs adequate .....................
26. B6PE press rating adequate; test to psig.~
27. Choke manifold complies w/API RP-53 (May 84) .......
28. Work will occur without operation shutdown .......
29. Is presence of H2S gas probable .............
GEOLOGY
APPR
DATE.
30. Permit can be issued w/o hydrogen sulfide measures .... YN//,~
31. Data presented on potential overpressure zones ..... Y ' ./~
32. Seismic analysis 9f shallow gas zones ..........
33. Seabed condition survey (if off-shore) ........
34. Contact name/phone for weekly progress reports .... /. Y
[exploratory only]
GEOLqGY: ENGINEERIN~: COMMISSION:
Comments/Instructions:
HOW/jo - A:~FORMS~cheklist rev
03/94
· .
Z
0
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.
..
No special effort has been made to chronologically
organize this category of information.
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 6
6539.00
T. MCGUIRE
D. HEIM
E-15A
500292066801
BP EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
12-DEC-95
MWD RUN 7
T. MCGUIRE
D. WESTER
MWD RUN 8
T. MCGUIRE
D. WESTER
MWD RUN 9
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
T. MCGUIRE
D. WESTER
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
6
liN
14E
903
OPEN HOLE
501
35.93
34.33
30.21
REMARKS:
IdlCR'bFILM ED
CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
6.000
9.625 9381.0
7.000 10292.0
11685.0
MWD - NGP (GR).
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WINDOW MILLED IN 7" CASING FROM 10290' TO 10340' MD.
DGWD RUNS 6, 7, 8, & 9 REPRESENT THIS WELL, E-15A.
DGWD RUNS 1, 2, 3, & 4 REPRESENT THE WELL E-15A PB1.
DGWD RUNS 6, 7, & 8 REPRESENT THE WELL E-15A PB2.
ALL RUNS WERE DIRECTIONAL WITH NGP GAMMA RAY.
NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH
REFERENCE FOR THIS WELL.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 10249.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
REMARKS:
STOP DEPTH
11635.0
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
6 10290.0 10363.0
7 10363.0 10578.0
8 10578.0 10593.0
9 10593.0 11685.0
MERGED MAIN PASS.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 I AAPI
ROP MWD 68 i FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
8
* DATA RECORD (TYPE# 0)
Total Data Records: 35
1014 BYTES *
Tape File Start Depth = 11687.000000
Tape File End Depth = 10248.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 8638 datums
Tape Subfile: 2 126 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10249.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10321.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 6.
06-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
10363.0
10290.0
10363.0
0
38.7
44.1
TOOL NUMBER
NGP 168
6.000
10292.0
KCL-BIOPOLYMER
9.10
75.0
11.2
28000
5.4
.000 .0
.000 46.9
.000 .0
.000 .0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
8
* DATA RECORD (TYPE# 0)
Total Data Records:
1014 BYTES *
Tape File Start Depth = 10365.000000
Tape File End Depth = 10248.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
Tape Subfile: 3
Minimum record length:
Maximum record length:
706 datums
66 records...
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 7
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10318.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10536.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 7.
07-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
10578.0
10363.0
10578.0
0
47.0
64.2
TOOL NUMBER
NGP 168
6.000
10292.0
KCL-BIOPOLYMER
9.00
66.0
9.0
32000
5.0
.000 .0
.000 49.2
.000 .0
.000 .0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
* DATA RECORD (TYPE# 0)
Total Data Records:
1014 BYTES *
Tape File Start Depth = 10600.000000
Tape File End Depth = 10300.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
10442 datums
Tape Subfile: 4
71 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 8
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10525.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIM UMANGLE:
STOP DEPTH
11524.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 8.
09-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
11574.0
10578.0
11574.0
0
64.3
93.2
TOOL NUMBER
NGP 145
6.000
10292.0
KCL-BIOPOLYMER
9.00
70.0
9.1
30000
5.2
.000 .0
.000 58.6
.000 .0
.000 .0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
DATA BELOW KOP OF 10593' MD IS FROM THE WELL E-15A PB2.
$
: BP EXPLORATION (ALASKA)
: E-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
* DATA RECORD (TYPE# 0 )
Total Data Records: 26
1014 BYTES *
Tape File Start Depth = 11580.000000
Tape File End Depth = 10520.000000
Tape File Level Spacing = 0.500000
'Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7070 datums
Tape Subfile: 5 90 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 9
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10534.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11635.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 9.
12-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
11685.0
10593.0
11685.0
0
65.6
92.3
TOOL NUMBER
NGP 168
6.000
10292.0
KCL-BIOPOLYMER
9.00
70.0
9.1
30000
5.2
.000 .0
.000 58.6
.000 .0
.000 .0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
8
* DATA RECORD (TYPE# 0)
Total Data Records: 28
1014 BYTES *
Tape File Start Depth = 11687.000000
Tape File End Depth = 10530.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 17388 datums
Tape Subfile: 6 91 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 7 is type: LIS
95/12/12
01
**** REEL TRAILER ****
95/12/12
O1
Tape Subfile: 7 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Tue 12 DEC 95 3:32p
Elapsed execution time = 1.20 seconds.
SYSTEM RETURN CODE = 0
l'aPe SUbfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
6540.00
T. MCGUIRE
D. WESTER
500292066870
BP EXPLORATION (ALASKA) INC.
MWDRuNSPERRY-SUN12_DEC_95 2 DRILLINGMwDRuNSERVICE~~/~3
T. MCGUIRE
D. HEIM
T. MCGUIRE
D. HEIM
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
MWD RUN 4
T. MCGUIRE
D. HEIM
OPEN HOLE
6
liN
14E
903
501
35.93
34.33
30.21
CASING
DRILLERS
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING 6.000
REMARKS: MWD - NGP (GR) .
1% I%V I I ill'l II
9.625 938~
.ooo
10621.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WINDOW MILLED IN 7" CASING FROM 10290' TO 10340' MD.
DGWD RUNS 1, 2, 3, & 4 REPRESENT THIS WELL, E-15A PB1.
DGWD RUNS 6, 7, 8, & 9 REPRESENT THE WELL E-15A.
DGWD RUNS 6, 7, & 8 REPRESENT THE WELL E-15A PB2.
ALL RUNS WERE DIRECTIONAL WITH NGP GAMMA RAY.
NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH
REFERENCE FOR THIS WELL.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 10240.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
REMARKS:
STOP DEPTH
10571.0
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 10292.0 10425.0
2 10425.0 10528.0
3 10528.0 10581.0
4 10581.0 10621.0
MERGED MAIN PASS.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
* DATA RECORD (TYPE# 0)
Total Data Records: 10
1014 BYTES *
Tape File Start Depth = 10622.000000
Tape File End Depth = 10238.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 2308 datums
Tape Subfile: 2 101 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
o£ape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10238.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10375.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 1.
01-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
10425.0
10292.0
10425.0
0
37.0
42.0
TOOL NUMBER
NGP 168
6.000
10292.0
KCL
9.00
180.0
11.2
30800
8.0
.000
.000
.000
.000
.0
51.6
.0
.0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 4
4 90 310 01 1
4 90 810 01 1
Tape File Start Depth = 10405.000000
Tape File End Depth = 10238.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 1006 datums
Tape Subfile: 3 67 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10375.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10478.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 2.
02-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
10528.0
10425.0
10528.0
0
42.0
45.4
TOOL NUMBER
NGP 168
6.000
10292.0
KCL-BIOPOLYMER
9.10
63.0
9.3
31500
5.8
.000 .0
.000 51.6
.000 .0
.000 .0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
8
* DATA RECORD (TYPE# 0)
Total Data Records:
1014 BYTES *
Tape File Start Depth = 10525.000000
Tape File End Depth = 10370.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 3242 datums
Tape Subfile: 4 67 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10478.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10537.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 3.
03-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
10581.0
10528.0
10581.0
0
45.6
45.7
TOOL NUMBER
NGP 168
6.000
10292.0
KCL-BIOPOLYMER
9.10
63.0
9.3
31500
5.8
.000 .0
.000 51.6
.000 .0
.000 .0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 3
Tape File Start Depth = 10590.000000
Tape File End Depth = 10475.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
1700 datums
Tape Subfile: 5
66 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10531.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10571.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OEMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 4.
03-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
10621.0
10581.0
10621.0
0
45.3
45.3
TOOL NUMBER
NGP 145
6.000
10292.0
KCL-BIOPOLYMER
9.00
66.0
9.3
32000
4.8
.000 .0
.000 46.9
.000 .0
.000 .0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
ROP MWD 68 1 FPHR
* DATA RECORD (TYPE# 0)
Total Data Records:
1014 BYTES *
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
Tape File Start Depth = 10622.000000
Tape File End Depth = 10530.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 3798 datums
Tape Subfile: 6 66 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 7 is type: LIS
95/12/12
01
**** REEL TRAILER ****
95/12/12
01
Tape Subfile: 7 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Tue 12 DEC 95 3:38p
Elapsed execution time = 0.88 seconds.
SYSTEM RETURN CODE = 0
_.a Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
MWD RUN 6
6541.00
T. MCGUIRE
D. HEIM
E-15A PB2
500292066871
BP EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
12 -DEC- 95
?
T. MCGUIRE
D. WESTER
T. MCGUIRE
D. WESTER
6
liN
14E
903
501
35.93
34.33
30.21
lST STRING
2ND STRING
3RD STRING
PRODUCTION STRING 6.000
REMARKS: MWD - NGP (GR) .
OPEN HOLE CASING
RUtlLHZU
BIT SIZE (IN) SIZE (IN)DEP~~'
9.625 93
.ooo
1157
0
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WINDOW MILLED IN 7" CASING FROM 10290' TO 10340' MD.
DGWD RUNS 6, 7, & 8 REPRESENT THIS WELL, E-15A PB2.
DGWD RUNS 6, 7, 8, & 9 REPRESENT THE WELL E-15A.
DGWD RUNS 1, 2, 3, & 4 REPRESENT THE WELL E-15A PB1.
ALL RUNS WERE DIRECTIONAL WITH NGP GAMMA RAY.
NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH
REFERENCE FOR THIS WELL.
.£LE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 10249.0
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
$
REMARKS:
STOP DEPTH
11524.0
EQUIVALENT UNSHIFTED DEPTH -
BIT RUN NO MERGE TOP MERGE BASE
6 10290.0 10363.0
7 10363.0 10578.0
8 10578.0 11574.0
MERGED MAIN PASS.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A PB2
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE~ 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves-.
Name Tool Code Samples Units
GR MWD 68 i AAPI
ROP MWD 68 I FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
8
* DATA RECORD (TYPE# 0)
Total Data Records: 32
1014 BYTES *
Tape File Start Depth
Tape File End Depth
= 11575.000000
= 10248.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7966 datums
Tape Subfile: 2 117 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
~ape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10249.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10321.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 6.
06-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
10363.0
10290.0
10363.0
0
38.7
44.1
TOOL NUMBER
NGP 168
6.000
10292.0
KCL-BIOPOLYMER
9.10
75.0
11.2
28000
5.4
.000 .0
.000 46.9
.000 .0
.000 .0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
BP EXPLORATION (ALASKA)
E-15A PB2
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 3
Tape File Start Depth = 10365.000000
Tape File E~d Depth = 10248.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
Tape Subfile: 3
Minimum record length:
Maximum record length:
706 datums
66 records...
62 bytes
1014 bytes
l'ape Subfile 4 is type: LIS
FILE HEADER
FI LE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 7
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10318.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10536.0
07-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
10578.0
10363.0
10578.0
0
47.0
64.2
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 168
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
6.000
10292.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL-BIOPOLYMER
9.00
66.0
9.0
32000
5.0
.000 .0
.000 49.2
.000 .0
.000 .0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 7.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A PB2
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68
2 ROP MWD 68
1 AAPI
1 FPHR
4 4 90 310 01 1
4 4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10600.000000
Tape File End Depth = 10300.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 9770 datums
Tape Subfile: 4 71 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 8
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
NGP 10525.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11524.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: MWD RUN 8.
09-DEC-94
MSC 1.32
DEP 2.041 NGP 5.74
MEMORY
11574.0
10578.0
11574.0
0
64.3
93.2
TOOL NUMBER
NGP 145
6.000
10292.0
KCL-BIOPOLYMER
9.00
70.0
9.1
30000
5.2
.000 .0
.000 58.6
.000 .0
.000 .0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: E-15A PB2
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
ROP MWD 68 1 FPHR
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 90 310 01 1
4 4 90 810 01 1
* DATA RECORD (TYPE# 0)
Total Data Records: 26
1014 BYTES *
Tape File Start Depth = 11575.000000
Tape File End Depth = 10520.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7040 datums
Tape Subfile: 5 89 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
£ape Subfile 6 is type: LIS
95/12/12
01
**** REEL TRAILER ****
95/12/12
01
TaPe Subfile: 6 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Tue 12 DEC 95 9:09a
Elapsed execution time = 0.99 seconds.
SYSTEM RETURN CODE = 0
* ALASKA COMPUTING CENTER *
* .
******************************
* ............................ .
....... SCHLUMBERGER .......
* ............................ *
******************************
F ECEiVED
SEP 0 5 1997
Ai~ka Oil & Gas Cons. CofflmL~
Anchorage
COMPANY NAME '. BP EXPLORATION
WELL NAME : E-15A
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API IVU~ER : 500292066801
REFERENCE NO '. 97345
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE - 97/09/ 3
ORIGIN : FLIC
REEL NA~i~ : 97345
CONTINUATION # :
PREVIOUS REEL :
CO~IF2~T : BP EXPLORATION, PRUDHOE BAY, E-15A, API #50-029-20668-01
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/09/ 3
ORIGIN : FLIC
TAPE NA~i~ : 97345
CONTINUATION # : 1
PREVIOUS TAPE :
COM~iEN~T : BP EXPLORATION, PRUDHOE BAY, E-15A, API #50-029-20668-01
TAPE HEADER
PRUDHOE BAY
CASED HOLE WIRELINELOGS
WELL NA~E: E-15A
API NUMBER: 500292066801
OPERATOR: BP EXPLORATION
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 3-SEP-97
JOB ~ER: 97345
LOGGING ENGINEER: S.MORRISON
OPERATOR WITNESS: K. BULLOCH
SURFACE LOCATION
SECTION: 6
TOWNSHIP: liN
RANGE: 14E
FNL: 903
FSL:
FEL: 501
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING: 60.74
DERRICK FLOOR:
GROUND LEVEL: 30.21
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 6. 000 4. 500 10950.0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD(~iEASURED DEPTH)
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: MWD
LDWG CURVE CODE: GR
RUN NUMBER:
PASS NUMBER:
DATE LOGGED: 6-DEC- 94
LOGGING COMPANY: SPERRY SUN
BASELINE DEPTH
88888.0
10797.5
10787.0
10785.5
10779.5
10772.0
10758.0
10752.5
10745.0
10741.5
10734.0
10732.0
10724.5
10722.5
10720.0
10719.5
10699.5
10697.5
10677.5
10665.5
10664.5
10662.5
10656.5
10652 0
10633 0
10602 0
10550 5
10533 5
10529 5
10519 0
10518 0
10507 0
10494 0
10480 5
10472 0
10461.5
10448.5
10447.5
10436.5
10435.5
10433.0
10429.0
10403.0
10402.0
10398.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GR CH CNTD
..............
88882.0 88882.0
10791.5 10791.5
10780.5
10780.5
10772.5 10772.5
10766.0 10766.0
10754.5 10754.5
10748.0 10748.0
10737.0 10737.0
10735.5 10735.5
10727.5
10719.0
10727.5
10719.0
10715.5
10715.5
10696.5 10696.5
10695.5 10695.5
10677.0 10677.0
10665.0
10665.0
10662.0 10662.0
10656.0 10656.0
10650.5 10650.5
10631.0 10631.0
10600.0 10600.0
10551.0 10551.0
10534.0 10534.0
10530.0 10530.0
10519.5
10519.5
10508.5 10508.5
10496.0 10496.0
10481.0 10481.0
10473.5 10473.5
10463.0 10463.0
10449.0
10449.0
10439.0
10439.0
10434.0 10434.0
10431.5 10431.5
10404.5
10404.5
10401.0
10401.0
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
10370.5 10373.5 10373.5
10363.5 10367.0
10351.5 10355.0 10355.0
10342.5 10344.5 10344.5
10340.0 10341.5
10339.5 10341.5
10338.0 10340.0
10337.0 10340.0
10336.5 10337.5
10334.5 10336.5 10336.5
10329.0 10332.5
10326.5 10329.0 10329.0
10316.5 10318.5
10315.5 10318.5
10315.0 10317.0
10297.5 10300.0
10296.5 10300.0
10290.0 10294.0 10294.0
10276.0 10279.5 10279.5
10268.5 10271.0
10267.5 10271.0
100.0 102.5 103.5
$
CONTAINED HERIN IS THE CNTD DATA ACQUIRED ON
BP EXPLORATION WELL E-15A. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #1 GRCH TO GR.MWD; AND PASS #1 NPHI
TO GR.MWD. ALL OTHER CNTD CURVES WERE CARRIED WITH THE
NPHI SHIFT.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : ! 024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUM~ER: 1
DEPTH INCREMENT: 0.5000
FILE SO?4MARY
LDWG TOOL CODE START DEPTH
GRCH 10823.0
CNTD 10835.0
STOP DEPTH
9810.0
981 O. 0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE:
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTD
REMARKS: THIS FILE CONTAINS CNTD PASS #1. NO PASS TO PASS SHIFTS
WERE APPLIED TO THIS DATA.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELaM CODE (HEX)
DEPT FT 572381 O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CNTD PU-S 572381 O0 000 O0 0 1 1 1 4 68 0000000000
NRAT CNTD 572381 O0 000 O0 0 1 1 1 4 68 0000000000
CRAT CNTD 572381 O0 000 O0 0 1 1 1 4 68 0000000000
NCNT CNTD CPS 572381 O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE:
NAN~ SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUY4B SAMP ELE~ CODE (HEX)
FCNT CNTD CPS 572381
CFTC CNTD CPS 572381
CNTC CNTD CPS 572381
GRCH CNTD GAPI 572381
TENS CNTD LB 572381
CCL CNTD V 572381
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 10829.000 NPHI. CNTD 18.746 NRAT. CNTD 3.900 CRAT. CNTD
NCNT. CNTD 5066.950 FCNT. CNTD 1299.323 CFTC. CNTD 1134.501 CNTC. CNTD
GRCH. CNTD -999.250 TENS.CNTD 1525.000 CCL.CNTD 0.000
DEPT. 9812.500 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD
NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD
GRCH. CNTD 33.003 TENS.CNTD -999.250 CCL. CNTD -999.250
3.584
4508.563
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE:
DEPTH INCREM~_~Ff: 0.5000
FILE SUB~L~RY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 10735.0 9810.0
CNTD 10747.0 9810.0
$
CURVE SHIFT DATA - PASS TO PASS (M~ASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUFiBER : 1
BASELINE DEPTH
88888.0
10740.5
10730.5
10723.0
10721.5
10720.5
10715.0
10711.5
10702.0
10698.0
10696.0
10694.5
10693.5
10687.0
10685.5
10677.5
10674.0
10673.0
10670.0
10665.5
10664.5
10662.0
10657.0
10645.0
10637.0
10633.5
10633.0
10631.5
10616.5
10609.0
10605.5
10601.0
10592.5
10586.5
10559.0
10556.5
10554.5
10551.5
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
GRCH CNTD
88882.0 88887.5
10740.0
10724.5
10718.0
10716.0
10720.0
10712.5
10711.5
10700.5
10696.5
10695.5
10693.0
10691.5
10685.5
10684.0
10676.5
10674.0
10672.0
10668.0
10665.0
10665.0
10661.5
10656.5
10641.5
10636.5
10631.5
10632.0
10628.5
10615.0 10615.5
10607.5
10602.0
10600.0
10592.0
10585.5
10558.5
10554.5
10553.0
10551.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE:
10547.5 10546.0
10536.0 10535.5
10530.0 10530.0
10518.5 10520.0
10518.0 10519.5
10515.0 10516.0
10508.5 10508.5
10494.0 10496.0
10493.5 10495.5
10478.5 10480.0
10473.5 10476.0
10466.0 10467.0
10458.0 10459.5
10450.0 10451.0
10447.0 10449.0
10443.5 10446.5
10441.5 10443.0
10436.0 10438.0
10435.0 10437.5
10430.5 10429.5
10417.0 10419.0
10416.0 10413.0
10392.5 10390.0
10377.5 10380.0
10366.5 10369.5
10355.5 10352.5
10343.5 10341.5
10338.0 10336.5
10337.0 10340.0
10316.0 10318.5
10300.5 10303.5
10299.0 10299.5
10290.0 10295.5
10286.0 10290.0
10272.0 10275.5
10266.5 10269.5
10254.5 10259.0
10248.5 10252.5
10242.0 10245.5 10245.5
10236.0 10240.0
10233.0 10236.5
10229.5 10233.5
10211.5 10215.0
10193.0 10196.0
10191.5 10195.5
10180.5 10184.5
10172.0 10175.0
10171.5 10175.0
10159.5 10162.0
10158.5 10162.0
10149.5 10153.5
10148.5 10151.0
10145.5 10148.5
10145.0 10148.5
10143.0 10146.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE:
10140.0
10138.5
10136.5
10129.0
10126.0
10110 0
10103 5
10101 5
10095 5
10087 5
10087 0
10085 0
10081 0
10077 5
10075 0
10070 5
10069 5
10067 0
10064 5
10061 5
10057 0
10053.0
10052.0
10050.5
10047.0
10046.5
10045.0
10043.0
10039.0
10037.5
10033.5
10031.5
10025.0
10022.0
10021.0
10019.0
10012.0
10008.0
10006.0
10003.0
10001.5
9997.0
9994.5
9993.0
9990.5
9980.0
9977.5
9973.5
9957.5
9946.0
9940.5
9938.0
9935.5
9931.0
9927.5
10142.0
10138.5
10131.5
10104.0
10098.0
10089.0
10087.0
10083.0
10079.5
10077.0
10070.5
10066.0
10059.0
10055.5
10054.0
10052.5
10049.0
10046.5
10046.0
10039.5
10035.5
10027.0
10023.5
10021.0
10007.5
9996.5
9991.5
9982.5
9978.5
9973.5
9958.5
9947.5
9943.0
9940.0
9937.5
9932.5
10142.0
10129.5
10113.0
10106.5
10090.5
10088.0
10083.5
10072.5
10070.5
10064.5
10055.0
10050.0
10041.0
10033.5
10024.0
10015.0
10011.5
10005.0
10003.5
10000.0
9995.5
9938.0
9933.5
9930.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PA GE:
9926.5 9928.0
9920.0 9919. $
9914.0 9916.0
9912.5 9914.0
9909.0 9911.5
9907.0 9908.0
9898.5 9899.5
9898.0 9899.5
9894.5 9896.5
9880.5 9883.0
9874.0 9876.0
9864.5 9866.0
9861.5 9864.5
9860.5 9861.5
9858.0 9860.0
9848.0 9850.0 9851.5
9841.5 9843.0
9839.5 9842.0
9839.0 9840.5
9835.0 9836.5
9823.0 9825.0
9822.5 9825.5
9820.0 9822.0
9816.0 9819.0
100.0 102.0 103 . 0
$
REMARKS: THIS FILE CONTAINS CNTD PASS #2. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #2 GRCH TO PASS #1 GRCH; AND PASS #2
NPHI TO PASS #1 NPHI. ALL OTHER CNTD CURVES WERE
CARRIED WITH THE NPHI SHIFT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE '. 10
TYPE REPR CODE VALUE
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAIVE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 572381 O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNTD PU-S 572381 O0 000 O0 0 2 1 1 4 68 0000000000
NRAT CNTD 572381 O0 000 O0 0 2 1 1 4 68 0000000000
CRAT CNTD 572381 O0 000 O0 0 2 1 1 4 68 0000000000
NCNTCNTD CPS 572381 O0 000 O0 0 2 1 1 4 68 0000000000
FCNTCNTD CPS 572381 O0 000 O0 0 2 1 1 4 68 0000000000
CFTC CNTD CPS 572381 O0 000 O0 0 2 1 1 4 68 0000000000
CNTC CNTD CPS 572381 O0 000 O0 0 2 1 1 4 68 0000000000
GRCHCNTD GAPI 572381 O0 000 O0 0 2 1 1 4 68 0000000000
TENS CNTD LB 572381 O0 000 O0 0 2 1 1 4 68 0000000000
CCL CNTD V 572381 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 10746.500 NPHI.CNTD 21.088 NRAT. CNTD 3.841 CRAT. CNTD
NCNT. CNTD 4454.836 FCNT. CNTD 1159.775 CFTC. CNTD 1012.656 CNTC. CNTD
GRCH. CNTD -999.250 TENS.CNTD 1418.000 CCL. CNTD 0.000
DEPT. 9812.000 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD
NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD
GRCH. CNTD 32.410 TENS. CNTD -999.250 CCL. CNTD -999.250
3.898
4021.807
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE · FLIC
VERSION · O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 11
**** FILE HEADER ****
FILE NAP4~ : EDIT .003
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE ~ER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INC~: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 10789.0 9812.0
Cl~TD 10801.0 9812.0
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUblBER .. 1
BASELINE DEPTH
88888.0
10787.5
10785.5
10783.5
10780.5
10778.5
10777.5
10773.5
10763.5
10756.5
10755.0
10753 0
10744 5
10733 5
10724 0
10722 5
10720 5
10719 5
10714 0
10713.5
10698.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTD
..............
88884.5 88882.5
10784.0
10780.5
10774.5
10773.0
10768.5
10760.0
10750.0
10748.0
10727.5
10719.0
10718.0
10715.5
10711.0
10778.0
10772.0
10750.0
10740.0
10717.0
10711.5
10696.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 12
10697.5 10695.0
10693.0 10693.0
10685.5 10684.0
10677.5 10677.0
10677.0 10676.5
10671.0 10669.5
10666.0 10665.5
10662.5 10664.5
10658.0 10657.5
10657.5 10657.5
10648.5 10646.5
10638.0 10636.5
10631.5 10629.0
10623.0 10624.5
10622.0 10620.0
10617.5 10615.5
10607.5 10605.5
10603.0 10603.0
10598.5 10598.5
10587.0 10587.0
10577.5 10579.0
10572.0 10571.5
10566.5 10566.0
10551.0 10553.0 10551.0
10542.0 10543.5
10523.5 10525.0
10518.5 10519.5
10518.0 10519.5
10507.0 10508.0
10494.5 10496.0
10493.5 10495.0
10483.5 10485.0
10480.5 10480.5
10474.5 10476.0
10471.0 10471.0
10461.5 10463.5
10446.0 10449.0
10439.5 10441.5
10438.5 10442.0
10436.5 10439.0
10435.5 10438.0
10430.5 10432.0
10421.5 10421.5
10414.0 10415.5
10390.5 10393.5
10354.0 10355.0
10337.0 10340.0
10336.0 10340.0
10318.0 10320.0
10317.5 10319.5
10303.0 10306.0
10298.5 10303.5
10286.0 10290.0
10282.5 10287.5
10276.5 10280.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 13
10273.0 10277.5
10257.0 10260.5
10241.5 10245.5
10235.5 10240.0
10234.0 10237.0
10229.0 10233.5
10200.5 10204.5
10193 . 0 10196.5
10192.5 10196.0
10182.0 10186.5
10180.0 10184.5
10172.0 10175.5
10171.0 10175.0
10159.0 10162.0
10158.0 10162.0
10153.0 10155.5
10148.0 10151.0
10147.0 10151 . 0
10145.5 10148.5
10139.0 10141 . 5
10138.5 10143.0
10136.0 10138.5
10131.5 10135.0
10128.5 10131.5
10128.0 10132.0
10123.0 10125.0
10122.0 10125.5
10102.0 10106.0
10100.5 10104.0
10097.0 10100.5
10087.5 10090.0
10086.5 10090.0
10084.0 10087.0
10076.5 10079.5 10079.5
10070.0 10073.5
10069.0 10073.0
10065.0 10068.0
10064.0 10066.5
10062.5 10065.0
10061.0 10064.5
10057.5 10060.0
10052.5 10055.5
10051.5 10054.0
10051.0 10054.5
10050.0 10052.5
10046.5 10049.0
10045.5 10050.5
10042.5 10045.5
10037.5 10041.5
10036.5 10039.5
10033.0 10035.5
10024.0 10027.0
10023.0 10025.0
10022.0 10025.5
10021.5 10023.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Ceuter
3-SEP-1997 12:28
PAGE: 14
10020.0 10023.5
10016.5 10019.5
10011 . 0 10014.0
10005.0 10007.5
10004.0 10005.5
9996.5 10000.0
9994.0 9996.5
9990.0 9991.5 9993.5
9988.0 9988.0
9984.5 9986.5
9972.5 9973.5
9967.0 9968.0
9956.5 9958.0
9945.5 9948.0
9943.5 9947.0
9939.5 9942.5
9937.0 9939.5
9935.0 9938.0
9934.5 9937.5
9933.0 9936.5
9930.0 9932.5 9933.0
9924.5 9928.5
9924.0 9926.5
9919.0 9923.5
9912.0 9914.5
9905.5 9908.0
9899.0 9903.0
9896.5 9899.5
9894.5 9897.0
9893.0 9897.5
9887.0 9892.5
9882.0 9883.0
9879.5 9881.5
9877.5 9880.0
9856.5 9858.5
9847.5 9850.0
9843.0 9849.5
9837.0 9840.5
9833.0 9837.5
9828.5 9834.5
9821.0 9823.5
9815.0 9817.5
100.0 102.5 106.0
$
REMARKS: THIS FILE CONTAINS CNTD PASS #3. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #3 GRCH TO PASS #1GRCH; AND PASS #3
NPHI TO PASS #1NPHI. ALL OTHER CNTD CURVES WERE
CARRIED WITH THE NPHI SHIFT.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 15
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
* * SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 572381 O0 000 O0 0 3 1 1 4 68 0000000000
NPHI CNTD PU-S 572381 O0 000 O0 0 3 1 1 4 68 0000000000
N-RAT CNTD 572381 O0 000 O0 0 3 1 1 4 68 0000000000
CRAT CNTD 572381 O0 000 O0 0 3 1 1 4 68 0000000000
NCNTCNTD CPS 572381 O0 000 O0 0 3 1 1 4 68 0000000000
FCNT CNTD CPS 572381 O0 000 O0 0 3 1 1 4 68 0000000000
CFTC CNTD CPS 572381 O0 000 O0 0 3 1 1 4 68 0000000000
CNTC CNTD CPS 572381 O0 000 O0 0 3 1 1 4 68 0000000000
GRCH CNTD GAPI 572381 O0 000 O0 0 3 1 1 4 68 0000000000
TENS CNTD LB 572381 O0 000 O0 0 3 1 1 4 68 0000000000
CCL CNTD V 572381 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 10795.500 NPHI.CNTD 23.033 NRAT. CNTD 4.400 CRAT. CNTD
NCNT. CNTD 4693.334 FCNT. CNTD 1066.667 CFTC. CNTD 931.358 CNTC. CNTD
GRCH. CNTD -999.250 TENS.CNTD 1494.000 CCL. CNTD 0.000
DEPT. 9814.500 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD
NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD
GRCH. CNTD 30.600 TENS. CNTD -999.250 CCL.CNTD -999.250
4.160
4208. 710
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 16
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE ' 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE . :
FILE HEADER
FILE~ER: 4
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 4
DEPTH INCREM: 0.5000
FILE SUffmlARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 10827.0 9800.0
CNTD 10839.0 9800.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
BASELINE DEPTH GRCH C~FfD
88888.0 88883.0 88882.0
10827.5 10821.5
10817.0 10812.0
10788.0 10784.5
10772.0 10769.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 17
10761.0 10756.0
10755.5 10750.0
10751.5 10748.0
10745.0 10742.0
10743.0 10735.5
10739.5 10736.5
10734.0 10727.5
10725.0 10719.0
10720.5 10717.0
10719.5 10716.0
10702.5 10700.5
10696.0 10695.0
10693.0 10692.5
10678.0 10677.5
10674.5 10674.5
10666.0 10665.5
10664.5 10665.0
10657.0 10656.0
10652.0 10650.5
10648.5 10646.5
10632.0 10629.5
10624.0 10624.5
10607.0 10605.0
10603.0 10603.0
10596.5 10594.0
10579.5 10578.5
10567.0 10566.0
10562.0 10562.5
10550.5 10550.5
10543.5 10544.0
10525.5 10525.0
10519.0 10519.5
10518.5 10519.5
10494.5 10496.0
10493.5 10495.5
10481.0 10483.5
10480.0 10480.0
10475.0 10476.0
10471.0 10471.5
10450.0 10451.0
10447.0 10449.0
10437.0 10439.0
10435.5 10438.0
10418.5 10421.5
10410.0 10411.5
10396.5 10399.0
10371.5 10373.5
10338.0 10345.0
10337.5 10339.5
10319.5 10321.5
10313.0 10318.5
10309.0 10312.0
10297.5 10301.5
10294.5 10299.5
10285.0 10289.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 18
10272.5
10272.0
10262.5
10254.5
10247.0
10242.0
10238.0
10232.5
10221.0
10202.5
10192.5
10180.0
10172.0
10171.0
10159.0
10158.5
10148.0
10147.0
10144.5
10138.5
10129.0
10127.5
10122.5
10120.0
10103 0
10101 0
10098 5
10088 0
10087 5
10084 5
10080 5
10077.5
10077.0
10069.5
10064.0
10057.5
10053.0
10052.0
10047.5
10046.5
10037.5
10033.5
10031.0
10024.5
10023.5
10022.5
10018.5
10018.0
10015.5
10011.5
10009.5
10005.5
10005.0
10003.5
9996.5
10277.0
10267.0
10258.5
10250.5
10241.5
10224.5
10196.0
10175.0
10162.0
10151.0
10141.5
10131.5
10122.5
10104.0
10101.0
10090.0
10087.0
10082.5
10079.5
10066.0
10060.0
10055.5
10054.0
10049.0
10039.5
10035.5
10027.0
10025.0
10021.0
10014.0
10007.5
10275.5
10245.5
10236.5
10207.0
10184.0
10175.0
10162.5
10151.0
10148.5
10142.5
10132.0
10125.5
10106.5
10090.5
10080.0
10073.0
10050.0
10034.5
10025.5
10021.0
10017.5
10012.5
10008.0
10006.5
10000.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 19
9994.0 9996.5
9973.0 9973.5
9962.0 9962.5
9946.0 9948.0
9938.0 9940.0
9934.5 9938.0
9930.5 9932.5 9933.0
9928~0 9929.0
9924.0 9926.5
9923.0 9923.5
9912.5 9914.5
9894.5 9897.0
9894.0 9896.5
9890.0 9892.0
9881.0 9883.0
9879.0 9881.5
9877.5 9880.0
9875.0 9878.0
9874.5 9877.5
9864.5 9867.0
9855.0 9858.5
9847.5 9850.0
9846.5 9851.0
9844.0 9849.5
9841.5 9843.0
9834.5 9837.5
9832.0 9834.5
9826.0 9832.5
9816.5 9822.0
9815.0 9817.5
100.0 102.5 105.5
$
REMARKS: THIS FILE CONTAINS CNTD PASS #4. THE DEPTH SHIFTS SHOWN
ABOVE REFLECT PASS #4 GRCH TO PASS #1GRCH; AND PASS #4
NPHI TO PASS #1NPHI. ALL OTHER CNTD CURVES WERE
CARRIED WITH THE NPHI SHIFT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 20
TYPE REPR CODE VALUE
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 572381 O0 000 O0 0 4 1 1 4 68 0000000000
NPHI CNTD PU-S 572381 O0 000 O0 0 4 1 1 4 68 0000000000
ArRAT CNTD 572381 O0 000 O0 0 4 1 1 4 68 0000000000
CRAT CNTD 572381 O0 000 O0 0 4 1 1 4 68 0000000000
NCNTCNTD CPS 572381 O0 000 O0 0 4 1 1 4 68 0000000000
FCNT CNTD CPS 572381 O0 000 O0 0 4 1 1 4 68 0000000000
CFTC CNTD CPS 572381 O0 000 O0 0 4 1 1 4 68 0000000000
CNTC CNTD CPS 572381 O0 000 O0 0 4 1 1 4 68 0000000000
GRCH CNTD GAPI 572381 O0 000 O0 0 4 1 1 4 68 0000000000
TENS CNTD LB 572381 O0 000 O0 0 4 1 1 4 68 0000000000
CCL CNTD V 572381 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 10833.000 NPHI.CNTD 18.822 NRAT. CNTD 3.821 CRAT. CNTD
NCNT. CNTD 4954.315 FCNT. CNTD 1296.463 CFTC. CNTD 1132.004 CNTC. CNTD
GRCH. CNTD -999.250 TENS. CNTD 1437.000 CCL.CNTD 0.000
DEPT. 9802.500 NPHI.CNTD -999.250 lV-RAT. CNTD -999.250 CRAT. CNTD
NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD
GRCH. CNTD 33.111 TENS. CNTD -999.250 CCL.CNTD -999.250
3.594
4496.645
-999.250
-999.250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 21
**** FILE TRAILER ****
FILE NAFiE : EDIT .004
SERVICE · FLIC
VERSION · O01CO1
DATE . 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
FILE HEADER
FILE ~ER:
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
DEPTH INCREMENT O. 5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
1, 2, 3, 4,
CNTD
THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING
AND DEPTH CORRECTIONS WERE APPLIED.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 40
4 66 1
5 66
6 73
7 65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 22
TYPE REPR CODE VALUE
8 68 0.5
9 65 FT
11 66 25
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 572381 O0 000 O0 0 5 1 1 4 68 0000000000
NPHI CNAV PU-S 572381 O0 000 O0 0 5 1 1 4 68 0000000000
NRAT CNAV 572381 O0 000 O0 0 5 1 1 4 68 0000000000
CRAT CNAV 572381 O0 000 O0 0 5 1 1 4 68 0000000000
NCNT CNAV CPS 572381 O0 000 O0 0 5 1 1 4 68 0000000000
FCNTCNAV CPS 572381 O0 000 O0 0 5 1 1 4 68 0000000000
CFTC CNAV CPS 572381 O0 000 O0 0 5 1 1 4 68 0000000000
CNTC CNAV CPS 572381 O0 000 O0 0 5 1 1 4 68 0000000000
GRCH CNTD GAPI 572381 O0 000 O0 0 5 1 1 4 68 0000000000
TENS CNTD LB 572381 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 10829.000 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV
NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV
GRCH. CNTD -999.250 TENS. CNTD 1525.000
DEPT. 9812.500 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV
NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV
GRCH. CNTD 33.003 TENS.CNTD -999.250
-999.250
-999.250
-999.250
-999.250
** ~ND OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 23
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 6
RAW CURVES
Curves a~d log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VE1VDOR TOOL CODE START DEPTH STOP DEPTH
10915.5 9802.5
CNTD
LOG H~ER DATA
DATE LOGGED: 27-MAY-97
SOFTWARE VERSION: 8C0 - 609
TI~IE LOGGER ON BOTTOM: 1945 27-MAY-97
TD DRILLER (FT) : 11645.0
TD LOGGER (FT): 10842.0
TOP LOG INTERVAL (FT): 9800.0
BOTTOM LOG INTERVAL (FT) : 10842.0
LOGGING SPEED (FPHR) : 1800.0
DEPTH CONTROL USED (YES/NO): NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CCL CALIPER
CNTD COMP. NEUTRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
TOOL NUMBER
6.000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 24
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT):
10950.0
BOREHOLE CONDITIONS
FLUID TYPE '.
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
SEA WATER
8.50
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (PT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
Iv-EAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
RE~NL~KS: DEPTH CORRELATED TO 25-DEC-1995 PDS JEWLERY LOG
DEVIATION AT LOGGING INTERVAL APPROX 77 DEG.
100 BBLS OF SEA WATER USED TO PACK FORMATION FOR
PASS #1.. .250 BBLS SEA WATER USED FOR R~AINING
3 PASSES.
CALS FROM SHOP DATED 22-MAY-97: CNTC=8212.24
CFTC=1832.45, RATIO=4. 482
GR SPIKES NEAR THE BOTTOM OF LOGS DUE TO HEATING OF
FORMATION ON BOTTOM DURING PREVIOUS RUNS.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 25
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
O0 000 O0 0 6 1 1 4 68 0000000000
DEPT FT 572381
NPHI PS1 PU 572381 O0 000 O0 0 6 1 1 4 68 0000000000
RTNR PS1 572381 O0 000 O0 0 6 1 1 4 68 0000000000
TNP~ PS1 572381 O0 000 O0 0 6 1 1 4 68 0000000000
RCNTPS1 CPS 572381 O0 000 O0 0 6 1 1 4 68 0000000000
RCFT PS1 CPS 572381 O0 000 O0 0 6 1 1 4 68 0000000000
CNTC PS1 CPS 572381 O0 000 O0 0 6 1 1 4 68 0000000000
CFTC PS1 CPS 572381 O0 000 O0 0 6 1 1 4 68 0000000000
GR PS1 GAPI 572381 O0 000 O0 0 6 1 1 4 68 0000000000
TENS PS1 LB 572381 O0 000 O0 0 6 1 1 4 68 0000000000
CCL PS1 V 572381 O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 10915.500 NPHI.PS1 35.371 RTNR.PS1 6.000 TNRA.PS1
RCNT. PS1 4923.077 RCFT. PS1 820.513 CNTC. PS1 4392.992 CFTC. PSi
GR.PS1 0.000 TENS.PSi 967.000 CCL.PS1 0.000
DEPT. 9802.500 NPHI.PS1 41.741 RTNR.PS1 6.625 TNRA.PS1
RCNT. PS1 2414.453 RCFT. PS1 364.425 CNTC. PS1 2205.619 CFTC. PSi
GR.PS1 33.436 TENS.PSi 1554.000 CCL. PS1 -999.250
5.677
716.429
6. 382
318.197
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 26
** END OF DATA **
**** FILE TRAILER ****
FILE NAIVE : EDIT .006
SERVICE : FLIC
VERSION . O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE . FLIC
VERSION . O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 7
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS--ER: 2
DEPTH INCREMENT: 0.5000
FILE SO?~/zARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
10900.0 9788.0
CNTD
LOG HEADER DATA
DATE LOGGED: 27-MAY-97
SOFTWARE VERSION: 8C0 - 609
TIME LOGGER ON BOTTOM: 1945 27-MAY-97
TD DRILLER (FT) : 11645.0
TD LOGGER (FT) : 10842.0
TOP LOG INTERVAL (FT): 9800.0
BOTTOM LOG INTERVAL (FT) : 10842.0
LOGGING SPEED (FPHR) : 1800.0
DEPTH CONTROL USED (YES/NO) : NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 27
CCL CALIPER
CNTD COMP. NEUTRON
$
CAL-U
CNT -D
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
6. 000
10950.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
SEA WATER
8.50
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REMARKS: DEPTH CORRELATED TO 25-DEC-1995 PDS JEWLERY LOG
DEVIATION AT LOGGING INTERVAL APPROX 77 DEG.
100 BBLS OF SEA WATER USED TO PACK FORMATION FOR
PASS #1...250 BBLS SEA WATER USED FOR REMAINING
3 PASSES.
CALS FROM SHOP DATED 22-MAY-97:CNTC=8212.24
CFTC=1832.45, RATIO=4. 482
GR SPIKES NEAR THE BOTTOM OF LOGS DUE TO HEATING OF
FORMATION ON BOTTOM DURING PREVIOUS RUNS.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PA GE: 28
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAFiE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 572381 O0 000 O0 0 7 1 1 4 68 0000000000
NPHI PS2 PU 572381 O0 000 O0 0 7 1 1 4 68 0000000000
RTNR PS2 572381 O0 000 O0 0 7 1 1 4 68 0000000000
TNRA PS2 572381 O0 000 O0 0 7 1 1 4 68 0000000000
RCNTPS2 CPS 572381 O0 000 O0 0 7 1 . 1 4 68 0000000000
RCFT PS2 CPS 572381 O0 000 O0 0 7 1 1 4 68 0000000000
CNTC PS2 CPS 572381 O0 000 O0 0 7 1 1 4 68 0000000000
CFTC PS2 CPS 572381 O0 000 O0 0 7 1 1 4 68 0000000000
GR PS2 GAPI 572381 O0 000 O0 0 7 1 1 4 68 0000000000
TENS PS2 LB 572381 O0 000 O0 0 7 1 1 4 68 0000000000
CCL PS2 V 572381 O0 000 O0 0 7 1 1 4 68 0000000000
** DATA **
DEPT. 10900.000 NPHI.PS2 13.247 RTNR.PS2 3.000 TNRA.PS2
RCNT. PS2 5052.632 RCFT. PS2 1684.211 CNTC. PS2 4508.598 CFTC. PS2
GR.PS2 0.000 TENS.PS2 740.000 CCL.PS2 0.000
DEPT. 9788.000 NPHI.PS2 45.432 RTNR.PS2 6.893 TNRA.PS2
RCNT. PS2 2108.396 RCFT. PS2 306.057 CNTC. PS2 1852.526 CFTC. PS2
GR.PS2 36.123 TENS.PS2 1596.000 CCL.PS2 -999.250
2. 838
1470. 565
6. 801
267.223
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 29
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .008
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILENUM~ER 8
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUM~ER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
10842.5 9790.5
CNTD
LOG HEADER DATA
DATE LOGGED: 27-MAY-97
SOFTWARE VERSION: 8C0- 609
TINZE LOGGER ON BOTTOM: 1945 27-MAY-97
TD DRILLER (FT) : 11645.0
TD LOGGER (FT) : 10842.0
TOP LOG INTERVAL (FT) : 9800.0
BOTTOM LOG INTERVAL (FT) : 10842.0
LOGGING SPEED (FPHR) : 1800.0
DEPTH CONTROL USED (YES/NO): NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE ~ 30
CCL CALIPER
CNTD COMP. NEUTRON
$
CAL-U
CNT-D
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
6. 000
10950.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
SEA WATER
8.50
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
REMARKS: DEPTH CORRELATED TO 25-DEC-1995 PDS JEWLERY LOG
DEVIATION AT LOGGING INTERVAL APPROX 77 DEG.
t00 BBLS OF SEA WATER USED TO PACK FORMATION FOR
PASS #1...250 BBLS SEA WATER USED FOR REMAINING
3 PASSES.
CALS FROM SHOP DATED 22-MAY-97: CNTC=8212.24
CFTC=1832.45, RATIO=4. 482
GR SPIKES NEAR THE BOTTOM OF LOGS DUE TO HEATING OF
FORMATION ON BOTTOM DURING PREVIOUS RUNS.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 31
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 572381 O0 000 O0 0 8 1 1 4 68 0000000000
NPHI PS3 PU 572381 O0 000 O0 0 8 1 1 4 68 0000000000
RTNR PS3 572381 O0 000 O0 0 8 1 1 4 68 0000000000
TNRA PS3 572381 O0 000 O0 0 8 1 1 4 68 0000000000
RCNTPS3 CPS 572381 O0 000 O0 0 8 1 1 4 68 0000000000
RCFT PS3 CPS 572381 O0 000 O0 0 8 1 1 4 68 0000000000
CNTC PS3 CPS 572381 O0 000 O0 0 8 1 1 4 68 0000000000
CFTC PS3 CPS 572381 O0 000 O0 0 8 1 1 4 68 0000000000
GR PS3 GAPI 572381 O0 000 O0 0 8 1 1 4 68 0000000000
TENS PS3 LB 572381 O0 000 O0 0 8 1 1 4 68 0000000000
CCL PS3 V 572381 O0 000 O0 0 8 1 1 4 68 0000000000
** DATA **
DEPT. 10842.500 NPHI.PS3 35.371 RTNR.PS3 6.000 TNRA.PS3
RCNT. PS3 4923.077 RCFT. PS3 820.513 CNTC. PS3 4392.992 CFTC. PS3
GR.PS3 0.000 TENS.PS3 1230.000 CCL.PS3 0.000
DEPT. 9790.500 NPHI.PS3 45.335 RTNR.PS3 6.953 TNRA.PS3
RCNT. PS3 2172.709 RCFT. PS3 305.867 CNTC.PS3 1973.951 CFTC.PS3
GR.PS3 32.019 TENS.PS3 1589.000 CCL.PS3 -999.250
5.677
716.429
6.790
267.067
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 32
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .008
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NA~E : EDIT .009
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE i~J~IBER 9
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS--ER: 4
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
10893.5 9749.0
LOG HEADER DATA
DATE LOGGED: 27-MAY-97
SOFTWARE VERSION: 8C0 - 609
TIME LOGGER ON BOTTOM: 1945 27-MAY-97
TD DRILLER (FT) : 11645.0
TD LOGGER (FT): 10842.0
TOP LOG INTERVAL (FT) : 9800.0
BOTTOM LOG INTERVAL (FT) : 10842.0
LOGGING SPEED (FPHR) : 1800.0
DEPTH CONTROL USED (YES/NO): NO
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
TOOL NUMBER
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 33
CCL CALIPER
CNTD COMP. NEUTRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
CAL-U
CNT- D
6. 000
10950.0
SEA WATER
8.50
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 4000
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 20000
TOOL STANDOFF (IN):
Ri~VARKS: DEPTH CORRELATED TO 25-DEC-1995 PDS JEWLERY LOG
DEVIATION AT LOGGING INTERVAL APPROX 77 DEG.
100 BBLS OF SEA WATER USED TO PACK FORMATION FOR
PASS #1...250 BBLS SEA WATER USED FOR REMAINING
3 PASSES.
CALS FROM SHOP DATED 22-MAY-97: CNTC=8212.24
CFTC=1832.45, RATIO=4. 482
GR SPIKES NEAR THE BOTTOM OF LOGS DUE TO HEATING OF
FORMATION ON BOTTOM DURING PREVIOUS RUNS.
THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #4.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE: 34
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 44
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 23
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 572381 O0 000 O0 0 9 1 1 4 68 0000000000
NPHI PS4 PU 572381 O0 000 O0 0 9 1 1 4 68 0000000000
RTNR PS4 572381 O0 000 O0 0 9 1 1 4 68 0000000000
Tlv-RA PS4 572381 O0 000 O0 0 9 1 1 4 68 0000000000
RCNTPS4 CPS 572381 O0 000 O0 0 9 1 1 4 68 0000000000
RCFT PS4 CPS 572381 O0 000 O0 0 9 1 1 4 68 0000000000
CNTC PS4 CPS 572381 O0 000 O0 0 9 1 1 4 68 0000000000
CFTC PS4 CPS 572381 O0 000 O0 0 9 1 1 4 68 0000000000
GR PS4 GAPI 572381 O0 000 O0 0 9 1 1 4 68 0000000000
TENS PS4 LB 572381 O0 000 O0 0 9 1 1 4 68 0000000000
CCL PS4 V 572381 O0 000 O0 0 9 1 1 4 68 0000000000
** DATA **
DEPT. 10893.500 NPHI.PS4 35.371 RTNR.PS4 6.000 TNRA.PS4
RCNT. PS4 5052.632 RCFT. PS4 842.105 CNTC. PS4 4508.598 CFTC. PS4
GR.PS4 0.000 TENS.PS4 930.000 CCL.PS4 0.000
DEPT. 9749.000 NPHI.PS4 43.376 RTNR.PS4 6.280 TNRA.PS4
RCNT. PS4 1830.334 RCFT. PS4 267.352 CNTC. PS4 1793.697 CFTC. PS4
GR.PS4 33.577 TENS.PS4 1578.000 CCL.PS4 -999.250
5.677
735.283
6.565
233.438
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3-SEP-1997 12:28
PAGE:
35
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .009
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/09/ 3
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE · 97/09/ 3
ORIGIN . FLIC
TAPE NAME · 97345
CONTINUATION # : 1
PREVIOUS TAPE
COBff~-a~f : BP EXPLORATION, PRUDHOE BAY, E-15A, API #50-029-20668-01
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE · 97/09/ 3
ORIGIN : FLIC
REEL NAME : 97345
CONTINUATION # :
PREVIOUS REEL :
CO~ff~_2~T : BP EXPLORATION, PRUDHOE BAY, E-15A, API #50-029-20668-01