Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout194-134ON OR BEFORE PLUGGi~ & LOCATION REPORT State cf Alaska A/~ASKA 0iL & GA~ CONSERVATION COMMISSION Spud: Rev-'aw the we.i ~ .=: ~ e, and- c~en= c: plugging, well head sua='~,s, and !cca=icn c!earanca .- urovide Loc. clear, coda. ,~arker post or plate: Loca:ion Clearanc.: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Plugged Back for CTD Sidetrack WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 94-134 399-075 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20668-01 4. Location of well at surface 9. Unit or Lease Name 903' SNL, 501' WEb, SEC. 06, T11N, R14E, UM ?~~~ Prudhoe Bay Unit At top of productive interval!~I 10. Well Number 2005' SNL, 214' WEb, SEC. 01, T11N, R13E, UM E-15A At total depth [~~ 11. Field and Pool 2330' SNL, 1063' WEb, SEC. 01, T11N, R13E, UM Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and sen"~T'R~7'i .... Pool KBE = 65.04'I ADb 028280 12. Date Spudded11/30/94 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' water depth' if OffshOre 116' NO' Of cOmpletiOns12/11/94 5/25/99 N/A MSLI Zero 17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV ~1~[~ 121. Thickness of Permafrost 11684 8990 FTI 11667 8990 FTI I~Yes [~No ~,, ~' ¢' f_' ~, '\1~/~ ' 1900' (Approx.) 22. Type Electric or Other Logs Run ~ ~ ~ [.. ~ '¢ .'--~, ~' LWD, GR, CCL 23. CAS,N.G, L,NER AND CEMENT,NC RECORD CASING SETTING DEPTH HOLE ...~t SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD .. _~ ¢,r~rC~ft't..~ea!~OUNT PULLED 20"X 30" Insulated Conductor Surface 110' 36" 8 cu yds co/[m,~J'~0i~ & l~StS, t~u~o...," ...... 13-3/8" 72# L-80 Surface 2671' 17-1/2" 3720 cu ft/~c"tT~set II 7" 26# L-80 9381' 10290' 8-1/2" ~68 cu ft Class 'G' 4-1/2" 12.6# L-80/13Cr 9736' 11667' 6" 162 cuff Class 'G' "-'; : ' ..... ' ~ ~ L_ , ,, 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 9689' 9626' MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10520' Cast iron Bridge Plug 10427' Set Whipstock 27. PRODUCTION TEST Date First Production [Method of Operation (Flowing, gas lift, etc.) Not on ProductionI N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBb GAS-MCF WATER-BBL CHOKE SIZE ]GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBb IGAs-MCF WATER-BBb OIL GRAViTY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Subsea Top Zone 1B 10718' 8878' 31. List of Attachments Summary of Daily Drilling Report 32. I hereby certify that the foregoing is true an.d correct to the best of my knowledge Terrie Hubble , Title Technical Assistant III Date E-15A 94-134 399-075 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL-' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 To: From: Anchorage Production Engineering cc: Ted Stagg/John McMullen SSD Wendt Well: E-15a Operation: Set CIBP & Whipstock Anchor. Run Dummy Whipstock Stinger to check orientation Date: Cost Code: Detail Code: Job ID: Est Daily Cost: May 25 & 26, 1999 4P1279-9335-070-xxx CTSDTRK/Rig Prep/etc N/A $64,402** Summary Ma¥25 & 26, 1999: MIRU HB&R. Kill well with 313 bbls filtered 2% KCL water and freeze protect tubing with 30 bbls MEOH. MIRU SWS Ut #2158. Pick up Baker CIBP on SAFE system. RIH. Set CIBP at 10520' (ref: PDS GR/CCL 3/12/96). POH. PT tubing to 1500 psi. OK. Call for radio silence. Pick up TIW Whipstock anchor and RIH. Set bottom of anchor at 10440' (ref: PDS GR/CCL 3/12/96). Good surface indication of set. POS tool indicated lug orientation at 38° right of high side. POH. Lay down setting tool and POS tool. Pick up WS latch with GPIT. RIH to verify orientation. Inconsistent orientation readings. POH to inspect tools. Check repeatability of POS and GPIT tools on the surface. Both repeat well. Stinger has been in anchor slot ..... tattletale sheared. Marks on bullnose suggest stinger tagging hard on something, possibly the top of the anchor at higher eline speed. Replace tattletale, add swivel to GPIT tool. RIH. Tag anchor at 20 fpm. Make four entries, all consistent at 112° to 115° left of high side. POH. Tattletale not sheared. RIH again. Make six entries at various running speeds. Readings varied from 114° to 128° left of high side (looking downhole). Wellbore deviation is 51.7°. POH. Tattletale (2" long piece of lead solder) mashed against key, but not sheared. The key is shiny on the bottom like it has rubbed in the keyway. The tattletale is not sheared possibly due to the high wellbore deviation. This is the highest wellbore deviation that this anchor has been set in by this TIW representative. Discuss options with Slope CTD personnel. Given the facts that (a) the well is highly deviated reducing ability to set down weight, (b) the positive markings on the stinger indicating entry into the anchor, and (c) that thirteen readings fell between 111° and 128° left of high side, the orientation verification is thought to be valid. Rig down SWS Ut #2158. Note: Estimated Daily Costs include the cost of the TIW Whipstock and personnel time to run it, although these costs will be incurred after CTD rig up. Initial Well Status SiWHP lAP 0AP GLP FLP FLT (psi) (psi) (psi) (psi) (psi) (°F) Shut In 0 500 0 N/A 200 45 Time Operation 0500 MIRU HB&R & Peak for well kill. Safety meeting. 0630 MIRU SWS Ut #2158. Safety Meeting. PU Baker CIBP and setting tool (SAFE system) 0730 Stab lubricator, RU HB&R for PT 0810 PT lubricator to 2500 psi. OK. 0815 Open Swab, RIH 0928 Tie in with CCL at jewelry 0941 Set down at liner top @ 9736'. Make three attempts at various speeds to pass. Continue in hole. Page1 Jperation: E-15a CIBP & WS A,,chor May 25 & 26, 1999 Page: 2 Time Operation 0950 Run tie in strip 10600' to 10450'. Position plug at 10520' (ref PDS GR/CCL 3/12/96) 1000 Set plug. Good indication of set. 1010 Tag plug - OK. POH 1115 CCH, LD setting tools 1140 PT tubing to 1500 psi 1210 'Safety Meeting with TIW while PT. 1235 RDHB&R. PT OK 1310 RU TIW anchor and setting tools 1330 Short Found in Owen Firing head. Wait on parts from Deadhorse 1430 Make up tools and check orientation. Packer lug orientation is 55° left of POS 0°. Safety Audit By Thayer/Walsh in progress 1500 Call for radio silence. 1540 Stab lubricator. Open swab (34 turns) and RIH. lAP=480, CAP=0, WHP=250 1650 Tie in at jewelry 1710 Log up from 10480' to 10300' to check tie in 1720 Pull into position. Set anchor at 10440' (btm of anchor) 1730 POH 1820 At surface. Bleed down and LD tools. 1835 PU Stinger and GPIT. Lug orientation is 13° right of GPIT 0° 1855 Open swab, RIH 1935 On bottom. Sting into anchor six times at various speeds. Readings from 120° left to 26° right. First 3 readings consistent at lower running speed. Last three at higher running speed very inconsistent. 1950 POH to inspect latch and tool string. 2045 CCH. Bleed down and lay down tool string. Check repeatability of POS and GPIT tools on the surface. Both repeat well. Stinger has been in anchor slot ..... tattletale sheared. Marks on bullnose suggest stinger tagging hard on something. 2145 Replace tattletale, add swivel to GPIT tool 2200 RIH. Will tag anchor at slower speed and try to get 3 repeatable readings. 2240 Enter Anchor with stinger. Attempt #1: Orientation = 111° left of high side (looking downhole) Attempt #2: Orientation = 114° left of high side (looking downhole) Attempt #3: Orientation = 113° left of high side (looking downhole) Attempt #4: Orientation = 115° left of high side (looking downhole) Hole Deviation: 51.3° 2255 POH ~peration: E-15a CIBP & WS ~,,,chor May 25 & 26, 1999 Page: 3 Time Operation 2340 OOH. Bleed down, lay down tools. Tattletale not sheared. 2350 RIH 0020 Enter Anchor with stinger. Attempt #1: Orientation -- 123° left of high side (looking downhole) Attempt #2: Orientation = 114° left of high side (looking downhole) Attempt #3: Orientation = 126° left of high side (looking downhole) Attempt #4: Orientation = 128° left of high side (looking downhole) Attempt #5: Orientation = 126° left of high side (looking downhole) Attempt #6: Orientation = 114° left of high side (looking downhole) Hole Deviation: 51.7° 0050 POH 0135 OOH. Bleed down, lay down tools. Tattletale mashed against key, but not sheared. Key is shiny on the bottom like it has rubbed in keyway. Tattletale possibly not sheared because of the high deviation. This is the highest deviation ever set by this TIW representative. 0150 Discuss with McMullen & Hupp. Data thought to be valid. Decide to rig down eline. 0230 RD SWS 0400 Off location. Final Well Status SIWHP lAP OAP GLP FLP FLT (psi) (psi) (psi) (psi) (psi) (°F) Shut In 250 480 0 N/A 200 50 Fluids Pumped BBLS. Description 313 2% KCL 56 MEOH 369 Total Volume Pumped Well: E-15B Accept: 05/26/99 Field: Prudhoe Bay Spud: 05/29/99 APl: 50-029-20668-02 Re leas e: Permit: 99-042 CTD Unit: Nordic #1 05/27/99 1 10237' Moved Nordic I f/E-10A to E-15. Rig accepted at 12:30 hrs 5/26/99. RU slickline. Ran Sperry EMS & TIW indicator. Located in WS anchor. Orientation of Key is 46° R. POH & RD slickline. RIH w/TIW WS tray & anchor. Latched tray into WS anchor. Released running tool w/6K overpull. POH w/running tool. LD running tool. MU Weatherford 3.80" window mill & 2-7/8" motor. RIH w/window mill assy. 05/28/99 2 10428' TIH w/Milling BHA. Tag up on XN Nipple, correct depth (+18'). Mill thru XN Nipple, TIH to whipstock. Tag up on whipstock, flag pipe at 10427'. Begin milling, unable to make headway. Motor stalling, not drilling off. POOH. Found chunks of rubber had come off stator. Replace motor, TIH. Milled for 5 hrs. Made very little progress. POH to check mill and motor. Changed motor and mill. RIH. Attempt to mill at 10427.5'. (Motor stalling.) 05/29/99 3 10433' Attempted to mill w/ bladed mill. Made no progress below 10427'. POH. Changed to Weatherford.tapered (crayon) mill. RIH. Attempted to mill. Continued to stall at 10427'. Attempted injectivity test. Held 2000 psi. Have not milled thru csg wall. POH. Changed Packoff. Cut off 50 ft of coil. Changed to HC Diamond one step mill. RIH. Milled f/10427-10433'. 05/30/99 4 11032' Finish milling window. POOH, LD Milling BHA, PU Drilling BHA. TIH, tag up and correct depth (+16'). Drill and orient to move away from casing and drop angle. Drill ahead to 10835' (uncorrected depth). Wiper trip. Ran tie-in Icg. Made -21 ft correction to original E-15 open hole Icg (10/81). Corrected Depths: Window f/10406-412'. RA tag at 10,412'. Drilled to 10889'. Stuck while surveying. Worked stuck pipe. Pipe came free w/o crude. Wiper trip to window. Drilled to 11032'. Attempted to orient to 45R. Tool kept flipping to 90-100R. Short trip to improve orienting. 05/31/99 5 11675' Finished wiper trip. Drilled to 11253'. 500 ft short trip. Drilled to 11415'. Short tripped to window. Drilled to 11515'. Wt transfer problems. Short tripped to window. Drilled to 11629'. Wt transfer problems. Short tripped to window. Drilled to 11675'. Decision made to plug back due to poor sand quality. POH. Ran tie-in Icg (+18 correction). POH to plug back. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 Date: April 3, 1999 To: Alaska. Oil & Gas Conservation-Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Blair Wondzell Sr. Petroleum Engineer Re: Well E-15b CT Sidetrack Well E-15a is scheduled for a through tubing sidetrack to be drilled with coiled tubing. A schematic diagram of the proposed sidetrack completion is attached. E-15a is a horizontal sidetrack with both perforations and slotted liner in the horizontal section to be abandoned. E-15b will be completed with a fully cemented and perforated 2 7/8" liner. The following summarizes the procedure required to prepare E-15a for sidetracking and is submitted as an attachment to Form 10-403. 1. A tubing integrity test was successfully performed on 3/29/99. 2. Tubing and liner will be drifted with a 3.65" OD drift. 3. A Cast Iron Bridge Plug will be set at 10,500', above existing perfs. The well will be pressure tested to 1500 psi against this bridge plug. 4. A 4.5" whipstock will be set on E-Line at 10,424'. 5. Window milling through the 4 ½" liner will be done by drilling coil after approval of the Form 10-40t. Prep work is expected to begin by May 15, 1999 and milling/drilling is expected to begin about May 20, 1999. ?¢ Ted Stagg CT Drilling Engineer cc: Well File Petrotechnical Data Center ~---- STATE OF ALASKA --. ALASK/-, _,IL AND GAS CONSERVATION CO,v,MISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging I--ITime Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 903' SNL, 501' WEL, SEC. 06, T11N, R14E, UM At top of productive interval 2005' SNL, 214' WEL, SEC. 01, T11N, R13E, UM At effective depth 2325' SNL, 1050' WEL, SEC. 01, T11N, R13E, UM At total depth 2330' SNL, 1063' WEL, SEC. 01, T11N, R13E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic I~ Service 6. Datum Elevation (DF or KB) KBE: 65.04' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number E-15A 9. Permit Number 94-134 10. APl Number 50-029-20668-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11684 feet true vertical 8990 feet Effective depth: measured 11667 feet true vertical 8990 feet Casing Length Size Structural Conductor 110' 20"x 30" Surface 2671' 13-3/8" Intermediate 9872' 9-5/8" Production 909' 7" Liner 1931' 4-1/2" 4-1/2" Baker IBP at 11495' Plugs (measured) Junk (measured) Cemented 8 cu yds concrete 3720 cu ft Arcticset II 1415 cu ft Class 'G', 130 cu ft AS I 468 cu ft Class 'G' 162 cu ft Class 'G' Alar~ 0il & Gas C0nsr~¢rr_¢4si~'~ Anchorage 110' 110' 2671' 2671' 9872' 8391' 9381' - 10290' 8009' - 8723' 9736' - 11667' 8284' - 8992' Perforation depth: measured 10890' - 10920', 10988' - 11495' (Slotted section), 11495' - 11655 (Slotted, below IBP) true vertical 8983'- 8985', 8990'- 8998', 8998'- 8993 (below IBP)0P~[¢INAL Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 9689' Packers and SSSV (type and measured depth) 7" Baker packer at 9626'; 4-1/2" Otis SSSV landing nipple at 2076' 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 4. Estimated date for commencing operation May 15, 1999 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: Ted Stagg, 564-4694 Date approved I15. Status of well classifications as: [] Oil [] Gas E~ Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ Ted Stagg Title CT Drilling Engineer I ~ ~ Commission Use Only Date Conditions of Approval: Notify Commission so representative may witness Plug integrity ,,,'" BOP Test ~ Location clearance__ Mechanical Integrity Test Subsequent form req~i¢- ORIGINAL SIGNED-BY Robert N Christenson · ~,e-,'-"- ,.-q' 7~ Approved by order of the Commission · _~ . ~. Commissioner Form 10-403 Rev. 06/15/88 ~'~~ I Approval N o.,~?~'.-. Submit In Triplicate TREE: 6" CIW WELLHEAD: FMC ACTUATOR: BAKER E-15b Proposed Completion KB. ELEV = 60.74' BF. ELEV = 32.21' 9-5/8 D.V. PACKER I 2,600 13 3/8" 72# L-80 BTRS 12,670 4.5", 12.6#, NSCT, L-80 TUBING ID: 3.958" CAPACITY: .01522 BBL/FT SSSV LANDING NIPPLE (OTIS) (3.813" ID) GAS LIFT MANDRELS 4.5"xl.5" (MERLA)(W/RA LATCHES) N° MD(BKB) TVDss I Dev 2 4,418 4,191 I 41 1 7,881 6,821 I 40 Top of 7" Liner 19,38 I 9-5/8", 47#/ft, L-80, 19,872 BTRS Shoe PERFORATION SUMMARY REF: LOG: SPERRY SUN MWD 12/1/94 Size SPF Interval Open/Sqzed 2-7/8" 6 10,890- 10,920' Open 12/98 4-1/2" n/a 10,988- 11,495' 13CR Slotted Below IBP set 11,495 4~96 4-1/2" J n/a 11,495-11,655'113CRSIotted 4-1/2 .... X" NIPPLE (OTIS)(3.813"ID) / 7" Baker Packer (SABL-3)(3.875" ID) 4-1/2 .... X" NIPPLE (OTIS)(3.813"ID) 4-1/2 .... XN" NIPPLE (OTIS)(3.725"ID) 4-1/2" WLEG ELMD I 9,605 19,626 19,660 9,677 9,689 9,701 6"41/2" TIW Tie Back I9,736 7" 26# L-80 BTRS Section Cut ~ 0,290 4.5" 12.6#,L-80,NSCT Solid Liner 9,750 10,950 IProposed 2 7/8" Cemented LinerI Proposed Whipstock 10,424' IProposedCast Iron Bridge Plug 10,500' I Top Perf 10,890 6"x4.5" CTC Packer ~ 0,953 Baker IBP top fishing neck I 1,495 .~ement sheath ~11,500 around slotted liner~ 1,511 PBTD 111,667 4.5",12.6#,13CR ~11,667 Slotted Liner Comments on E-15b abandonment & sidetrack prep Blair, May 4, 1999 The attached abandonment procedure for E-15b does not follow precisely the procedures described in the regs but is consistent with some earlier work and makes sense to me. The entire existing producing interval ofE-15a is essentially horizontal. There is no interest, from a reservoir management viewpoint, in cementing across this long horizontal interval prior to drilling the new sidetrack. Our goals can be met by setting a bridge plug above the existing perfs. The plan I have submitted calls for setting a cast iron bridge plug above the existing perfs and slotted liner and pressure testing this plug. The next step would be to set the whipstock anchor, which is a solid plug itself, just above the CIBP. This would provide two permanent plugs isolating the original horizontal completion from the window for the new sidetrack. The whipstock would then be stung into the whipstock anchor. After milling and drilling, the sidetrack completion will be a fully cemented 2 7/8" liner with a cement volume large enough to place 200 ft of cement above the window. While this procedure differs a bit from what is described in the regs I believe it makes both technical and economic sense for this type of sidetrack. To add additional cementing to this horizontal well prep would add significant cost with no benefit that I can see. Please call if further info or discussion is needed. Ted Stagg CT Drilling Eng. 564-4694 Ga~ ~o~s. ~o Anchorage (.:i R / R 0 P ~ {/lO ~ 8723 -.-. 8965 G E/R 0 P ~ ~ (~. 'i0292-"1062'i L I Ar"e dr'y d'¥tch A !" e samp'i es r'.equi' r"ed? yes ~nd r"ece'¥ vect'? 0 I::i I I--I--I IM G S E I:IL~I ~-- E S ~LI~ 1~0~ TRANSMITrAL(~k,dt To: State of Alaska Alaska Oil and Gas Conservation Comm. /" Attn.' Larry Grant 3001 Porcupine Dr. Anchorage, Alaska 99501 January 04, 1996 MWD Formation Evaluation Logs - E-15A, E-15APB1, & E-15APB2 AK-MW-40093 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jun Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way,//G, Anchorage, AK 99518 E-15A: 1 LDWG formatted LIS tape with verification listing. API#: 50-029-20668-01 1 LDWG formatted LIS tape with verification listing, dA ~Nasl{~ Oi' ~,; co,'°r' 1996. E-ISA PB2: 1 LDWG formatted LIS tape with verification listing. API#: 50-029-20668-71 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company I -'//- '7!-. WELL LOG TRANSMITTAL To: State of Alaska March 2, 1995 Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs - E-15A The technical data listed below is being submitted herewith. Direct any problems or concerns to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 2" x 5" MD Gamma Ray Logs: 2" x 5" TVD Gamma Ray Logs: 1 Bluelines 1 Rev. Folded Sepia 1 Bluelines 1 Rev. Folded Sepia RECEIVED MAR O$1995 Alaska Oil & Gas Cons, Commission Anchorage 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASKAOIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP ExpIoration 94-134 3. Address 8. APl Number P. 0. Box 196612, Anchora~le, Alaska 99519-6~12_] /r~ ! ,,, 50- 029-20668-01 4. Location of well at surface '~.~~_.~(( . . 9. Unit or Lease Name 903' SNL, 501' WEL, SEC. 6, T11N, R14E i: ;~;-"v'~" '"~-._.~ / ,~ , t ~' Prudhoe Bay Unit At Top Producing lnte rval ~/~ ~X~;- V~--~~ :~L ~.).-~ [ 10. Well Nu mb er ! ....... ~ E-15A (42-1-11-13) , , ~ ....... ~ 2005 SNL, 214 WEL, SEC. 1, T11N, R13E ! ~? !~" ~ ~'~ ~--~"//J'][ 11. Field and Pool ~ .. -: '-:; ;;~'. ; Prudhoe Bay FielcYPrudhoe Bay Pool 2330' SNL, 1063' WEL, SEC 1, T11N, R13E 5. Elevation in feet (indicate KB. DF, etc.) 6. Lease Designation and Serial No. KBE = 65.04' ADL 28280 12. Date Spudded11/30/94 13. Date T.D. Reached12/11/94 14' Date C°mp" Susp' °r Aband' 115' Water Depth' if °ffsh°re 116' N°' °, C°mpleti°ns12/19/94 N/A feet MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 121. Thickness of Permafrost 11684' MD/8990' TVD 11667' MD/8990' TVD YES [] NO [] 2076' feet MDI 1900' (Approx.) 22. Type Electric or Other Logs Run LWD 23. CASING, LINER AND CEMENTING RECORD SEFRNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO'I-I'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" X 30" Insulated Conductor Surface 110' 36" 8 cu yds Concrete 13-3/8" 72# L-80 Surface 2671' 17-1/2" 3720 cu ft Arcticset II 9-5/8" 47# L-80 Surface 9872' 12-1/4" 1415 cu ft "G'Y130 cu ft AS I 7" 26# L-80 9381' 10290' 8-1/2" 468 cu ft Class "G" 4-1/2" 12.6# L-80/13CR 9736' 11667' 6" 162 cuft Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD/ PACKER SET (MD) Slotted Liner 4-1/2", L-80 9689' 9626' 10988'-11655' MD External csg. pkr. @ 10953' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED ,27. PRODUCTION TEST iDate First Production Method of Operation (Flowing, gas lift, etc.) 12/28/94 Flowing Date of Test Hours Tested =RODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO TEST PERIOD ~ I ;Flow Tubing Casing Pressure 3ALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAViTY-APl (corr) Press. 24-HOUR RATE j~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. R-E( £1VED FEB -7 1995 Alaska Oil & Gas Cons. Commission Anchorac~, Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE .. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Subsea Top Zone 1 B 10718' 8878' R£¢£1VED FEB - 7 199,5 .& Gas Cons. Commission 31. LIST OF A'FFACHMENTS ' ': ~l~l¢~lor~!'R 32. i hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~~ /~'~ TitleDrilling£ngineerSu~ervisor Date'~'¢'~''f ~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: E-15A BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 11/18/94 10:00 SPUD: RELEASE: OPERATION: DRLG RIG: DOYON 14 WO/C RIG: DOYON 14 11/19/94 ( 1) TD:10500 PB:10500 11/20/94 ( 2) TD:10500 PB:10500 11/21/94 ( 3) TD:10500 PB:10500 CIRC OUT DIESEL MW: 0.0 HANDED OUT 2 STOP CARDS. HELD TWP SFTY MTGS. HELD A PRESPUD MTG. & DISCUSSED THE REVISED CH. 7. & GLYCOL SPILL. ACCEPTED THE RIG @2200 HRS ON 11/18/94. CANTILEVER RIG FLOOR BACK. MOVE, SPOT & SHIM RIG OVER WELL #E-15A. CANTILEVER RIG FLOOR OVER HOLE. HOLD PRE-SPUD MTG. SPOT SLOP TANK WHILE TAKING ON SEAWATER. RU LUB. & PULL BPV. RU & CIRC OUT 140 BBLS DIESEL, CIRC WELL. LD 7" TBG MW: 0.0 NO STOP CARDS. HELD 2) SFTY MTGS. CIRC WELL & RD CIRC LINES. SET BPV. ND TREE ASSY & NU BOPE. CHANGE RAMS F/3.5 T/5", HOOK UP FLOW LINE & CHK CLINE. TEST BOPE T/5000~. RU T/PULL 7" TBG. PULL T/275 - 300K & SHEAR @320K. LD 12 X 7 TBG HNGR. CBU. LD 7" 26# IJ4S L-80 W/26 RUBBER CLAMPS ON CL. & SSSV. NO PIPE DAMAGE SEEN @50'. SWEDGING CASG MW: 0.0 2 STOP CARDS. 2 SFTY MTGS. FINISH LD 7" 26# IJ4S L-80 TBG. 241 JTS. & RD TOOLS. RU & TEST BOPE. J. SPAULDING W/AOGCC WAIVED WITNESS OF BOPE TEST. 5" RAMS LEAKED. CHANGED & RE-TEST T/5000. OK. RIH W/5' DP T/2056. RU T/CBU. CIRC HOLE RD. POOH F/SWEDGE ATTEMPT. PU 8.5" SWEDGE & OIL JAR. RIH T/77' & CIRC. CHK TIGHT SPOT F/HYDRATES WHILE CIRC. NO SUCCESS. MU 10) 6.75" DC'S, JARS & 2 STNDS DP. CIRC HOLE @ 10BPM W/125 DEGREE SEAWATER @521'. STAND BACK 2 STNDS DP & MU 8.25" SWEDGE, 3) 8" DC-10' PUP. TAG COLLAPSED SPOT @77' SWEDGE T/86' & WORK SAME. CHANGE SWEDGE T/8-3/8". SWEDGE 9-5/8" CASG T/8-3/8" ADDED 4TH 8" DC & WORK THRU SAME SPOT 9', F/77' T/86' TAKING 20000 LBS T/GET BACK THROUGH SPOT. WELL : E-15A OPERATION: RIG : DOYON 14 PAGE: 2 11/22/94 ( 4) TD:10500 PB:10500 11/23/94 ( 5) TD:10500 PB:10500 11/24/94 ( 6) TD:10500' (3081) 11/25/94 ( 7) TD:10500' ( 0) SWEDGING 9 5/8" CSG MW: 0.0 SWEDGING OUT 9 5/8" CSG F/ 77 - 86' W/ 8 3/8" SWEDGE. CIRC 125 DEG SEAWATER @ 372'. PIC UP STAND OF 8" DC'S AND WORK SWEDGE THROUGH TIGHT SPOT F/ 84 - 86' CHANGE SWEDGE TO 8.5" ABD SWEDGING @ 81 - 86'. LAY DOWN 2 8" DC, MAKE UP SURFACE JARS AND JAR THROUGH F/ 81 - 86'. STAND BACK 9 6 3/4" DC AND PICK UP 8 5/8" SWEDGE. JAR AND SWEDGE F/ 81 - 84' CHANGE OUT OIL JARS, OLD ONE QUIT WORKING. JAR AND SWEDGE F/ 81 - 85', TIGHT JARRING OUT. CHANGE OUT SWEDGES F/ 8 5/8" TO 8 1/2" AND JAR AND SWEDGE F/ 84 - 86'. STAND BACK BHA AND TEST CSG, OK. JAR THROUGH TIGHT SPOT F/ 84 - 86' W/ 8 1/2" SWEDGE. CHANGE OUT SWEDGE F/ 8 1/2" TO 8 5/8" SWEDGE AND JAR ON SAME F/ 77 - 86'. RIH W/ 8.5" MILL MW: 0.0 JARRING AND SWAGING W/ 8 5/8" SWAGE F/ 81 TO 86'. PULL 100K OVER COMING BACK THRU. LAY DOWN SURFACE JARS AND 8" DC'S, CHANGE SWAGE TO 8 1/2", PU 6 3/4" DC. RIH TO 1829'. CIRC WELL. TEST CSG TO 3500#, OK. POH. LAY DOWN ALL SWAGING TOOLS AND PICK UP SLICK STICK RET. TOOLS. RIH TO 5000' SLM. CUT DRLG LINE. RIH PICKING 5" DP OFF RACK. TAG AND ENGAGE FISH @ 9303'. CBU. CHECK F/ FLOW, POH W/ FIHS. LAY DOWN FISH AND CHANGE BHA. RIH 8.5" MILL TOOK 10, 000 WT. GOING THRU BAD SPOT IN CSG. POOH W/PKR MW: 0.0 VIS: 0 CON'T RIH TRI-STATE MILL & PRT T/9321. LATCH ON TO PKR. MILL ON PCKR F/9321 UNTIL IT RELEASED & PUSHED PKR DOWN HOLE T/9381. CBU & CLEAR BORE HOLE OF GAS BUBBLE. CHK F/FLOW. POOH TIGHT @ 4450 & 3050. LOST THE PKR. NO DRAG THE REST OF THE WWAY OUT. NO TIGHT SOPT 80'+. MU TRISTATE SPEAR DRESSED W/4.805" GRAPPLE & RIH T/9383. TAG & ENGAGE FISH. CHK F/FLOW POOH 10 STNDS W/FISH. CHANGE OVER T/MILL FL. MW: 0.0 VIS: 0 CON'T POOH W/SPEAR-NO RECOVERY. WAIT ON TOOLS F/TRISTATE. MU 4.5" MILL ON SPEAR. RIH PU KELYY. ENGAGE FISH @9383. POOH SLOWLY - FISH HANGING UP ON CASG COLLARS. LD FISHING TOOLS. UNABLE T/REMOVE SPEAR F/FISH. LD SAME. RU TBG EQUIP. & LD TAIL PIPE. RIH W/6.75" DC'S & LD. PU 6" BIT & 6.75" DC'S. PU 40 JTS OF 3.5" 15.5# DP & RIH. SLIP & CUT 59.5' DL. RIH T/10479 & TAG CMT. C/O CMT F/10479-10500. REV CIRC. UNPLUG JET. CIRC & CHANGE OVER T/MILLING FLUID. WELL : E-15A OPERATION: RIG : DOYON 14 PAGE: 3 11/26/94 ( 8) TD:10345' ( 0) 11/27/94 ( 9) TD:10340' ( 0) 11/28/94 (10) TD:10340' ( 0) 11/29/94 (11) TD:10340' ( 0) CIRC HOLE CLEAN MW: 0.0 VIS: 0 CON'T T/CHANGE OVER T/MILLING FLUID @10500. 7" SECTION PLANNED. F/10300 T/10350. FLOW CHECK. PULL 10 STNDS FLOW CHK. STAND BACK 3.5" 15.5# DP F/CMT. MU 7" 5500 MILLMASTER SECTION MILL BHA. RIH T/10290/ START MILL @10290 T/10345. POOH W/SECT. MILL MW: 0.0 VIS: 0 CBU & CLEAN 7" SECT. F/10290 T/10340. 50' WINDOW. RECOVERED 57% OF IRON. 735 LBS. CHK F/FLOW PULL 10 STNDS. CHECK F/FLOW. POOH. FOUND KNIVES WORN OUT ON 1 SIDE-INDICATES THAT THE TOOL HAD NOT CUT OUT. NO WEAR ON BTTM OF BLADES. LD SECTION MILL. PU #2. RIH & CIRC @9381/7" LINER TOP. RIH T/10292. START CUT OUT T/10309. UNABLE T/GET BACK IN 7" @ 12290. ROTATE JAR & WORK PIPE TILL THE KNIVES CLOSED. DRAG UP T/320K THRU 7" HNGING UP ON EACH CASG CONNECTION WHILE POOH. POOH W/SECTION MILL MW: 0.0 VIS: 0 CON'T. POOH W/7" SECTION MILL #2. KNIVES BENT & FLOW TELL HAD MOVED UP. REDRESS #1 & NEW TOP SUB JETTED W/1-12/32 1-14/32. RIH W/7" 5500 MILLMASTER SECT. MILL. BREAK CIRC @9400. CON'T RIH T/10304. OPEN KNIVES @10304 & REAM T/10309. TAG UP CUT SECT. GOOD PARTICAL SIZE. APPEARS T/BE CUTTING THE FULL 7" AFTER COLLAR @10317. 120SPM @ 3000 PSI. 510 GPM. TOTAL RECOVERY 107% OR 1391 LBS. CIRC & CLEAN HOLE. CHK F/FLOW. PULL 10 STNDS. CON'T CHK F/FLOW. WHILE POOH. NO PROBLEMS. LD BHA. C/O PCKOFF & TBG SPOOL MW: 0.0 VIS: 0 CLEAR FLOOR OF MILLING TOOLS. KNIVES SHOW NORMAL HOOK WEAR F/CUTTING 7" CASG. PU 3.5" MULE SHOE ON 40 JTS OF 3.5" DP. STINGER. RIH ON 5" DP T/7978. SLIP & CUT 59.5' DL & CIRC. RIH T/10495. CIRC FULL CIRC LONG WAY 12 BPM @2500. PULL 1 STND. T/10400. REV. CIRC, WHILE STARTING BATCH MIX, HAD CHEMICAL PROBLEM/CMT MIXING WATER. DUMP CHEMICALS. RESTART BATCH MIXING. PUMP 20 BBLS WATER TEST LINES T/2500. OK. PUMP 18 BBLS CMT FOLLOW W/5BBLS WATER. DISPLACE W/MUD 155 BBLS W/RIG PUMP T/BAL. CIP @17:52 HRS. PULL 10 STNDS. CIRC PIPE VOL. @12 BPM @2500. PRESS UP ON CMT T/2000. LOST 250 # IN 30 MIN. EST TOP OF CMT @10075 W/7" WINDOW @10290 T/10340. POOH STAND BACK 80 STNDS OF 5" DP. LD 57 JTS OF 5" & STND BACK 3.5" DP. FLUSH BOP'S T/REMOVE ANY METAL CUTTINGS W/BOP WASHING TOOL. RIH W/12 STNDS 5" DP. PU HOWCO 9-5/8" STORM PCKR & SET 6' BELOW BASE FLANGE. ND BOP'S @ TBG SPOOL. REMOVE & CHANGE 9-5/8" PACKOFF & REPLACE TBG SPOOL. Gas Cons. (~ommissio. Anchor~ ~ WELL · E-15A OPERATION: RIG : DOYON 14 PAGE: 4 11/30/94 (12) TD:10307' ( 0) 12/01/94 (13) TD:10424' ( 117) 12/02/94 (14) TD:10528' ( 104) 12/03/94 (15) TD:10581' ( 53) SIDE TRACK @10295 MW: 0.0 VIS: 0 CONTINUE T/CHANGE OUT 9-5/8" PACKOFF. INSTALL NEW TBG SPOOL. TEST PACKOFF T/5000/15-MIN. OK. NU BOP'S. RETRIEVE STROM PACKER & POOH W/5" DP. SET TEST PLUG & TEST BOP'S & MANIFOLD T/5000. HYDRIL T/2500. CHK ACCUMULATOR, PULL TEST PLUG & SET WEAR BUSHING. PU 6" BIT & RIH. BREAK CIRC @6250, RIH T/10008. C/O CMT PU KELLY @10008. TAG SOFT CMT @10175. FIRM UP 10270. K/O T/10295'. WINDOW 10290 T/10340. ORIENT DRILL 30 DEG. T/LEFT OF HI SIDE OF HOLE & TIME DRIL @ 2FPH T/10307. MU NEW BHA MW: 0.0 VIS: 0 1 STOP CARD. 2) 5-MIN SFTY MTGS. 1 BOP DRILL. 48 SEC. SHUT IN. TIME DRLG F/10307 T/10340. DIRECTIONAL DRLG & SURV. F/10340 T/10424. CIRC. HOLE CLEAN. F/MUD CHANGEOVER. PHASE 2 WEATHER COND. TRUCKS WERE LATE. DISPLACE WELL W/FLO-PRO MUD @ 9.0 PG. CHK F/FLOW. PULL 5 STDS. DP CHECK F/FLOW. POOH. PULL MWD PROBE. PULL WEAR RING & INSTALL TEST PLUG. CHANGE TOP PIPE RAMS T/3.5" X 6 VARIABLE & TEST SAME T/5000. PULL TEST PLUG & INSTALL WEAR RING. SET F2000S MOTOR @2 DEGREES. RIH W/BIT #3 MW: 0.0 VIS: 0 RIH W/BIT & BHA #2. TEST MOTOR & MWD. PU KELLY & WASH 70' T/BTTM. DIRECT. DRLG & SURV F/10424 T/10528. HI TRQ/LO PENETRATION. CHK F/FLOW. PULL 5 STNDS. CHK. F/FLOW. POOH & LD JARS. MU 8>5" SHOE. 18" LONG. JARS & STAND OF HWDP. RIH T/79'. STACK OUT W/ALL & LD. MU NEW BHA, PU NEW JARS & RIM W/BIT #3. RIH W/BIT #4 MW: 0.0 VIS: 0 CON'T RIH T/8000. SLIP & CUT DL 60'. RIH & CAUTION WASH 50' T/BTTM. NO FILL. DRLG & SURV F/10528 T/10581, SLIDING. CHK F/FLOW & PULL 5 STNDS. CHK F/FLOW OK. RIH T/10050. PU KELLY & MAD PASS F/10050 T/10100. POOH F/NEW BIT & BHA. CHANGE BHA & PU NEW MOTOR SET @ 2.5 DEGREE. RIH W/NEW BIT # 4 & BHA. RECEIVED FEB -? 1995 Oil & Gas Cons. Commission Anchom,. ~ WELL : E-15A OPERATION: RIG : DOYON 14 PAGE: 5 12/04/94 (16) TD:10090' ( 0) 12/05/94 (17) TD:10290' ( 200) 12/06/94 (18) TD:10311' ( 21) 12/07/94 (19) TD:10546'( 235) 12/08/94 (20) TD: 10895' ( 349) 12/09/94 (21) TD:l1561' ( 666) REV. CIRC FfW: 0.0 VIS: 0 WASH 50' T/BTTM. LOST 500~ PP. NO FURTHER LOSS, PRESUME A LOST JET. DRLG & SURV F/10581 T/ 10621. PUMP FLUCTUATING-WOULD NOT DRILL AFTER 40' 10 MIN FLOW CHK. PULL 5 STNDS. 10 MIN FLOW CHK. POOH-BIT, BTTM SECTION OF MOTOR & ROTOR LEFT IN HOLE. PU/MU & LD 5.75" DBL BSKT OVERSHOT W/BUMPER SUB & OIL JARS. MU MULE SHOE & RIH OE. PU DP OFF RACK. CIRC HOLE CLEAN WHILE BATCH MIXING CMT. MIX & PUMP 22 BBLS. CMT KO PLUG. PULL 12-STNDS DP/PULL THE 1ST 6 SLOWLY. POOH F/KO ASSY MW: 0.0 VIS: 0 REV. CIRC. NO CMT. HOLD PRESS ON CMT, 500#, INCREASE T/2000. NO BLEED OFF. POOH & LD 54 JTS. OF 5" DP. PULL WEAR BUSHING, SET TEST PLUG, TEST BOPE 250 T/5000. WITNESSED BY AOGCC. OK. MU BHA & RIH T/4000. CUT DL. CON'T RIH T/10035. WASH F/10035 T/10063. DRLG FIRM CMT F/10063 T/10290. CBU. FLOW CHK & POOH F/NEW BHA. DRILLING MW: 0.0 VIS: 0 FINISH POOH PU BHA. RIH FILL PIPE T/5600 & 8000. COULDN'T GET MWD T/WORK UNTIL 8000' ON FILL UP. POOH T/CHK MWD. CHANGE MWD. FOUND JUNK IN IMPELLAR ON PROBE. RIH & TEST MWD @5000 & 8000. ORIENT & K/O F/10290 T/10311. DRILLING MW: 0.0 VIS: 0 DRILLING F/10311 T/10362. CHK F/FLOW. PULL 5 STANDS - CHK F/FLOW. POOH F/NEW BIT & CHK BHA. RIH FILL PIPE EVERY 2500 & CHK MWD PULSE. CUT DL. FINISH RIH. WASH & REAM F/10290 T/10362. OUT OF GAUGE HOLE F/10328 T/10362. DRILLING & SURV. F/10362 T/10546. DRILLING 6" HRZNTL HOLE MW: 0.0 VIS: 0 CON'T DIRECTIONAL DRILLING 6" HOLE F/10546 T/10577. CIRC TILL HOLE WAS CLEAN. 10 MIN FLOW CHK. LD 8 JTS OF 5" DP. FLOW CHECK, POOH F/MOTOR & BHA CHANGE. LD MWD PROBE. THREADS UNDER DUMP VALVE WERE DAMAGED DURING CHANGE-OUT. REPLACED MOTOR & ADJUSTED T/1-5/8 DEGREE, PU NMLC & ORIENT TOOL. RIH T/10360. FILL PIPE EVERY 3000'. PU KELLY, MWD SURVEY EVERY 30' F/10363 T/ 10570. F/DIRECTION. DIRECTIONAL DRILLING 6" HORIZONTAL HOLE F/10577 T/10895. DRILLING 6" HORZTL MW: 0.0 VIS: 0 DRILLING 6" HORIZONTAL HOLE F/10895 T/11561. TOTAL OF 189' OF SAMD. TOP OF SAND @ 11100. WELL : E-15A OPERATION: RIG : DOYON 14 PAGE: 6 12/10/94 (22) TD:10550' ( 0) 12/11/94 (23) TD:10986' ( 436) 12/12/94 (24) TD:11686' ( 700) 12/13/94 (25) TD:11686' ( 0) P/B. RIH. MW: 0.0 VIS: 0 3 STOP CARDS. 2 SFTY MTGS W/STEVE WALLS. 1 BOP DRILL. CON'T DRILLING 6" HORIZONTAL HOLE F/11561 T/11572. DRILLING SHALE ONLY HAVE 189' OF POOR QUALITY SAND IN 14 P. WILL PULL OUT & PLUG BACK. CHK FLOW. POOH F/PLUG BACK. STAND 3.5" HWDP & BHA. PU 3.5" MULE SHOE & 40 JTS. OF 3.5" DP. RIH ON 5" DP. HOWCO PLUG CATCHER @9024. RIH T/11563. CIRC & COND. HOLE WHILE BATCH MIXING CMT. MIX 225 SX OF CLASS G CMT. BJ STANDARD KICK OFF PLUG 17PPG. PUMP 20 BBLS WATER, TEST LINES T/3500. FOLLOW W/ 37.5 BBLS CMT. & KICKED WIPER PLUG OUT W/5BBLS WATER. DISPLACED W/153 BBLS OF MUD. SHEARED WIPER PLUG W/2500 PSI. SPOT CMT ON BTTM. TOP OF CMT EST @10550. 10& EXCESS OF 6" HOLE. PULL 14 STNDS. CIP @ 20:05 HRS. ON 12/9. CIRC & CLEAR PIPE @10170. CBU NO CMT. POOH & LD 40 JTS OF 3.5" 13.3# G DP. SORT T/SHIP OUT ALL 13.3# DP. TEST BOP'S & MANIFOLD. MU BHA #1, BIT #8. RIH & ORIENT TOOLS. CHK MOTOR. CON'T T/RIH. EST. TOP OF CMT @10550' DRILLING MW: 0.0 VIS: 0 1 STOP CARD - 2 SFTY MTGS. CON'T RIH W/BIT #8 ON KO BHA #1 T/2500. CIRC & TEST MWD & MUD MOTOR, MWD FAILED, CHK RIG FLOOR CENSORS & POOH. CHANGE OUT MWD SOURCE. CIRC, RIH T/2500. TEST MWD. OK. RIH. FILL PIPE @7" SHOE/10290. LD 21 JTS OF 5". RIH T/SHOE. SLIP & CUT 59.5' DL. RIH TAG CMT @10440.CO CMT F/10440 T/10600. DIRECTIONAL TIME DRILL LOWSIDE KO 120 DEGREE RIGHT OUT OF 6" HOLE. F/10600 T/10986. SHOULD BE HORIZONTAL IN LOWER SECTION OF 13 P SAND. REACHED TD MW: 0.0 VIS: 0 HELD 4 SFTY MTGS. 1 HOUR W/EACH CREW. CONTINUED DIRECTIONAL DRILLING OFF KO PLUG F/10986 T/11684 TD. HORIZONTAL @11160 IN THE LOWER 13P SAND. 500' OF SAND. CIRC & COND. HOLE @ TD. POOH & LD 159 JTS OF 5" DP. WILL STAND BACK 50 STNDS F/MOVE. REAM 6" HOLE MW: 0.0 VIS: 0 CON'T T/LD 5" DP, 3.5" NMHW, MWD & MOTOR. PU 6" HOLE OPENER, STAB, 2 LC, 3 PT ROLLER REAMNER, DC, STAB, PU 3.5" 15.5# E & 3.5" 15.5# X 95. RIH T/10540. TOOK WT. REAM 6" HOLE F/10540 T/11684. PLAN T/SPOT 40 BBLS PRO FLO ACROSS HRZTL SECTION. & CHANGE OVER T/CLEAN SEA WATER. THIS SHOULD LOWER HYDROSTATIC 317 PSI. ~6~ya IJ~ & G~s I~ons. Gommi~i~ WELL : E-15A OPERATION: RIG : DOYON 14 PAGE: 7 12/14/94 (26) TD:11684' ( 0) 12/15/94 (27) TD:11684 PB:11665 12/16/94 (28) TD:11684 PB:11665 CIRC. TOP OF 4.5" LINER MW: 0.0 VIS: 0 CONT. CIRC & PUMPING HI VIS SWEEP. SPOT 40 BBLS OF NEW FLO-PRO ACROSS THE HRZNTL PRODUCTION ZONE. DROP 2" OD RABBIT, POOH T/7" CASG SHOE @10290. CHANGE OVER T/SEAWATER F/10290 T/SURFACE. LOWER HYDROSTATIC 317 PSI. POOH STAND BACK 3.5" DP, LD 3.5" HWDP & REMAINING BHA, HOLE OPENER & 3-PT REAMER IN GOOD CONDITON. SLM IS OK. NO CORRECTION. RU & RUN 17 JTS OF 4.5" 12.6# 13 CR NSCT SLOTTED, 4-1/2" X 20' CTC OPEN HOLE INFLATABLE PACKER, 57 JTS OF 4.5" 12.6# L-80 NSCT SOLID LINER & TIW 7" X 4-1/2" LINER HANGER W/TIE BACK SLEEVE. RUN 1 STND OF 3.5" DP. CIRC PIPE VOL. RUN 4.5" LINER ON 3.5" DP T/10260. FILL PIPE EVERY 10 STNDS. PUMP PIPE & LINER VOL. @ 7" SHOE 10290 & MU CMT HEAD. RUN 4.5" LINER THRU OPEN HOLE T/11667. STUCK PIPE 17' OFF BTTM. CIRC @3.5 BPM @700 PSI. DROP BTM PLUG. SET LINER HANGER, CTC PACKER & OPEN HOWCO CMT'R. CIRC THRU CMT'R 6 BPM @1100 PSI, BATCH MIX CMT. PUMP 20 BBLS 5% KCL WATER, TEST LINES T/4000. FOLLOW BY 29 BBLS 134 SX CMT @ 15.8 PPG. KICK OUT PLUG W/5 BBLS WATER. DISPLACE W/RIG PUMP @ 6 BPM 1100 PSI. BUMPED PLUG W/3000 PSI. CIP @05:55 ON 12/13. RELEASE F/TIW HANGER & CIRC. MILLING ON PLUGS MW: 0.0 PU & RELEASE F/PCKR & CIRC HOLE CLEAN. POOH F/MILLING ASSY. LD 27 JTS DP. REPAIR HIGH TRANSMISSION DRIVE CHAIN. POOH W/PKR RUNNING TOOL. LD RUNNING TOOL & MU 3-7/8" BIT- 3.5'' DRILEX MOTOR-16) 3-1/8" DC'S- 47 JTS OF 2-7/8" PAC DP. RIH T/9650. CUT DL & TEST LINER TOP T/3500#. OK. CON'T RUNNING IN HOLE & TAG @10492. DRILLING ON WIPER PLUGS @10942. RUNNING 3000# WT. MOTOR STALLING OUT. USE ROTARY @35 RPM & CUT 1.5'. MILLING ON CMT. MW: 0.0 DRILLING ON PLUGS IN CMT'R VALVE. POOH T/CHK MUD MOTOR & BIT. LD 3-1/8" DC'S & CHANGE OUT MUD MOTOR & BIT. PU DC'S & RIH T/1990. TEST MUD MOTOR PRESS T/3200 W/40 SPM. PRESS T/EXCESSIVE. POOH T/CHK BIT & MOTOR EVERYTHING OK. CHANGE MOTOR T/2-7/8" MOTOR. RIH T/1990. TEST MOTOR T/1800 PSI @ 30 SPM. RIH T/10946. DRILLING ON PLUGS *& CMT @ 10946 T/10948. SIGNATURE: (drilling superintendent) DATE: Gas Cons. ~,omm%ss%on SHARED SERVICES DRILLING PBU/E-15A 500292066801 NORTH SLOPE COMPUTATION DATE: 4/ 3/9 SPFr-~TY-SUN DRILLING SERVICES ........ PAGE 1 DATE OF SURVEY: 1 4 --~ MWD SURVEY JOB NUMBER: AK-MW-40093 · KELLY BUSHING ELEV. = 65.04 FT. 5 OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10200 8653.95 8588.91 10290 8725.68 8660.64 10320 8748.67 8683.63 10350 8769.96 8704.92 10380 8789.97 8724.93 37 19 N 89.20 W .00 943.99S 4179.08W 4284.28 36 58 N 89.29 W .40 943.27S 4233.43W 4337.05 43 0 S 85.30 W 23.19 944.00S 4252.67W 4355.95 46 35 S 80.40 W 16.62 946.66S 4273.62W 4376.96 49 42 S 76.40 W 14.33 951.17S 4295.50W 4399.29 10410 8808.92 8743.88 10440 8826.89 8761.85 10470 8843.75 8778.71 10500 8859.52 8794.48 10530 8874.00 8808.96 52 0 S 72.70 W 12.26 957.38S 4317.91W 4422.53 54 24 S 69.30 W 12.10 965.20S 4340.61W 4446.42 57 12 S 66.30 W 12.47 974.59S 4363.57W 4470.91 59 24 S 62.20 W 13.75 985.68S 4386.55W 4495.80 62 54 S 58.20 W 16.50 998.75S 4409.33W 4520.95 10541 8879.09 8814.05 10572 8892.11 8827.07 10600 8903.29 8838.25 10630 8915.43 8850.39 10660 8927.49 8862.45 64 18 S 56.80 W 16.40 1004.26S 4417.99W 4530.63 66 0 S 54.40 W 8.92 1020.14S 4441.17W 4556.81 66 10 S 57.85 W 11.46 1034.19S 4462.09W 4580.37 66 5 S 60.40 W 7.78 1048.26S 4485.63W 4606.49 66 48 S 64.20 W 11.77 1061.12S 4510.12W 4633.26 10690 8938.81 8873.77 10723 8949.71 8884.67 10753 8957.48 8892.44 10786 8964.48 8899.44 10819 8971.12 8906.08 68 54 S 67.10 W 11.35 1072.58S 4535.46W 4660.53 73 5 S 68.90 W 13.54 1084.42S 4564.80W 4691.79 77 5 S 69.10 W 13.24 1094.89S 4592.07W 4720.73 78 11 S 69.00 W 3.37 1106.33S 4621.94W 4752.41 78 24 S 69.50 W 1.62 1117.67S 4651.88W 4784.15 10849 8977.23 8912.19 10881 8982.92 8917.88 10911 8987.15 8922.11 10942 8990.29 8925.25 10974 8992.35 8927.31 78 18 S 69.10 W 1.33 1128.16S 4679.64W 4813.56 81 0 S 69.00 W 8.53 1139.30S 4708.74W 4844.43 83 0 S 69.00 W 6.59 1150.07S 4736.80W 4874.19 85 11 S 69.50 W 7.38 1160.84S 4765.23W 4904.33 87 26 S 70.40 W 7.53 1171.85S 4795.39W 4936.20 11005 8993.72 8928.68 11036 8995.09 8930.05 11067 8996.69 8931.65 11098 8998.58 8933.54 11128 8999.92 8934.88 87 34 S 70.10 W 1.03 1182.45S 4824.92W 4967.37 87 19 S 69.70 W 1.51 1193.07S 4853.93W 4998.02 86 44 S 69.60 W 1.94 1203.79S 4882.83W 5028.60 86 16 S 69.60 W 1.48 1214.60S 4911.89W 5059.36 88 39 S 70.00 W 7.94 1225.03S 4940.26W 5089.35 11160 9000.26 8935.22 11191 9000.00 8934.96 11222 8999.46 8934.42 11252 8999.27 8934.23 11283 8999.99 8934.95 90 7 S 71.00 W 5.57 1235.68S 4970.33W 5121.06 90 51 S 71.00 W 2.40 1245.74S 4999.53W 5151.77 91 8 S 72.00 W 3.36 1255.54S 5028.82W 5182.52 89 35 S 71.00 W 6.23 1264.89S 5056.78W 5211.87 87 45 S 70.40 W 6.19 1275.23S 5086.29W 5242.96 RECEIVED APfl - 5 i995 Alaska Oil & Gas Coris. Commission Anchor~. ' SPE~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/E-15A 500292066801 NORTH SLOPE COMPUTATION DATE: 4/ 3/9 DATE OF SURVEY: 121294 MWD SURVEY JOB NUMBER: AK-MW-40093 KELLY BUSHING ELEV. = 65.04 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11314 9001.57 8936.53 86 22 S 70.30 W 4.50 1285.62S 5115.39W 11345 9003.28 8938.24 87 19 S 69.40 W 4.23 1296.31S 5144.54W 11376 9003.90 8938.86 90 24 S 68.60 W 10.15 1307.51S 5173.71W 11407 9003.69 8938.65 90 24 S 67.60 W 3.26 1318.95S 5202.16W 11438 9002.98 8937.94 92 11 S 67.80 W 5.82 1330.74S 5230.92W 5273.65 5304.47 5335.42 5365.72 5396.41 11470 9001.73 8936.69 92 18 S 67.30 W 1.59 1342.96S 5260.49W 11501 9000.52 8935.48 92 11 S 66.70 W 1.98 1354.94S 5288.72W 11532 8999.30 8934.26 92 18 S 66.80 W .46 1367.16S 5317.14W 11563 8998.05 8933.01 92 18 S 67.00 W .64 1379.37S 5345.77W 11594 8997.17 8932.13 91 0 S 66.80 W 4.27 1391.45S 5374.11W 5427.98 5458.18 5488.64 5519.29 5549.63 11625 8996.37 8931.33 91 54 S 66.70 W 2.86 1403.94S 5403.17W 11644 8995.75 8930.71 91 54 S 66.80 W .53 1411.30S 5420.31W 11684 8994.43 8929.39 91 54 S 66.80 W .00 1426.89S 5456.67W 5580.76 5599.13 5638.07 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5640.15 FEET AT SOUTH 75 DEG. 20 MIN. WEST AT MD = 11684 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 256.90 DEG. TIE IN POINT 10,200' WINDOW POINT 10,290' INTERPOLATED DEPTH 11,684' TIED IN FROM E-15AST2 AT 10,572' INTERPOLATED FROM 10290' TO 10530' AZIMUTHS INCLUSIVE SPEP-~-¥-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/E-15A 500292066801 NORTH SLOPE COMPUTATION DATE: 4/ 3/95 DATE OF SURVEY: 121294 JOB NUMBER: AK-MW-40093 KELLY BUSHING ELEV. = 65.04 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10200 11200 11684 8653.95 8588.91 8999.87 8934.83 8994.43 8929.39 943.99 S 4179.08 W 1546.05 1248.42 S 5007.33 W 2200.13 654.08 1426.89 S 5456.67 W 2689.57 489.44 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPEF~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PBU/E-15A 500292066801 NORTH SLOPE COMPUTATION DATE: 4 / 3 / 95 DATE OF SURVEY: 121294 JOB NUMBER: AK-MW-40093 KELLY BUSHING ELEV. = 65.04 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 10200 8653.95 8588.91 943.99 S 4179.08 W 1546.05 10213 8665.04 8600.00 943.87 S 4187.54 W 1548.91 2.86 10342 8765.04 8700.00 945.91 S 4268.63 W 1577.91 29.01 10511 8865.04 8800.00 990.44 S 4395.08 W 1646.19 68.27 10789 8965.04 8900.00 1107.28 S 4624.42 W 1824.34 178.15 10820 8971.24 8906.20 1117.89 S 4652.47 W 1848.76 24.42 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS S~ERRY-SUN DRILLING SERVICES -- ~ PAGE SHARED SERVICES DRILLING DATE OF SURVEY: 120594 PBU/E-15A ST MWD SURVEY 500292066870 JOB NUMBER: AK-MW-40093 NORTH SLOPE KELLY BUSHING ELEV. = 65.04 FT. COMPUTATION DATE: 4/ 3/95 OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 10200 8653.95 8588.91 37 19 N 89.20 W .00 943.99S 4179.08W 4284.28 10295 8729.67 8664.63 36 58 N 89.29 W .38 943.23S 4236.45W 4339.98 10381 8796.93 8731.89 41 5 S 86.60 W 5.63 944.60S 4290.93W 4393.36 10443 8843.09 8778.05 43 22 S 83.90 W 4.67 948.09S 4332.69W 4434.82 10476 8866.46 8801.42 45 10 S 85.76 W 6.80 950.14S 4355.38W 4457.38 10488 8875.08 8810.04 45 22 S 85.26 W 3.33 950.82S 4364.06W 4465.99 10504 8886.36 8821.32 45 37 S 85.69 W 2.42 951.73S 4375.50W 4477.34 10537 8908.98 8843.94 45 42 S 85.46 W .57 953.51S 4398.58W 4500.22 10565 8928.75 8863.71 45 20 S 81.16 W 10.95 955.85S 4418.56W 4520.22 10621 8967.75 8902.71 45 20 S 81.16 W .04 961.92S 4457.56W 4559.58 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4560.17 FEET AT SOUTH 77 DEG. 49 MIN. WEST AT MD = 10621 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 256.90 DEG. TIE IN POINT 10,200' WINDOW POINT 10,295' INTERPOLATED DEPTH 10,621' AZIMUTH IS INTERPOLATED AT 10,381' RECEIVED APR -- 5 1995 Alaska Oil & Gas Cons. Commission Anchor~. · SPERRY-SUN DRILLING SERVICES ANCHOILAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/E-15A ST 500292066870 NORTH SLOPE COMPUTATION DATE: 4/ 3/95 DATE OF SURVEY: 120594 JOB NUMBER: AK-MW-40093 KELLY BUSHING ELEV. = 65.04 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10200 8653.95 8588.91 10621 8967.75 8902.71 943.99 S 4179.08 W 1546.05 961.92 S 4457.56 W 1653.25 107.20 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALAS KA PAGE 3 SHARED SERVICES DRILLING PBU/E-15A ST 500292066870 NORTH SLOPE COMPUTATION DATE: 4/ 3/95 INTERPOLATED VALUES FOR EVEN 100 DATE OF SURVEY: 120594 JOB NUMBER: AK-MW-40093 KELLY BUSHING ELEV. = 65.04 FT. OPERATOR: BP EXPLORATION FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 10200 8653.95 8588.91 943.99 S 4179.08 W 1546.05 10213 8665.04 8600.00 943.87 S 4187.54 W 1548.91 2.86 10339 8765.04 8700.00 943.44 S 4264.11 W 1574.87 25.96 10474 8865.04 8800.00 950.03 S 4353.96 W 1609.54 34.67 10617 8965.04 8900.00 961.50 S 4454.85 W 1652.10 42.56 10621 8967.75 8902.71 961.92 S 4457.56 W 1653.25 1.15 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPERRY-SUN DRILLING SERVICES SHARED SERVICES DRILLING PBU/E-15A ST2 500292066871 NORTH SLOPE COMPUTATION DATE: 4/ 3/95 DATE OF SURVEY: 121v~= MWD SURVEY JOB NUMBER: AK-MW-40093 KELLY BUSHING ELEV. = 65.04 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10200 8653.95 8588.91 10290 8725.68 8660.64 10320 8748.67 8683.63 10350 8769.96 8704.92 10380 8789.97 8724.93 37 19 36 58 43 0 46 35 49 42 N 89.20 W .00 943.99S 4179.08W N 89.29 W .40 943.27S 4233.43W S 85.30 W 23.19 944.00S 4252.67W S 80.40 W 16.62 946.66S 4273.62W S 76.40 W 14.33 951.17S 4295.50W 4284.28 4337.05 4355.95 4376.96 4399.29 10410 8808.92 8743.88 10440 8826.89 8761.85 10470 8843.75 8778.71 10500 8859.52 8794.48 10530 8874.00 8808.96 52 0 54 24 57 12 59 24 62 54 S 72.70 W 12.26 957.38S 4317.91W 4422.53 S 69.30 W 12.10 965.20S 4340.61W 4446.42 S 66.30 W 12.47 974.59S 4363.57W 4470.91 S 62.20 W 13.75 985.68S 4386.55W 4495.80 S 58.20 W 16.50 998.75S 4409.33W 4520.95 10541 8879.09 8814.05 10572 8892.11 8827.07 10603 8904.75 8839.71 10635 8917.64 8852.60 10666 8929.81 8864.77 64 18 66 0 66 13 65 51 67 28 S 56.80 W 16.40 1004.26S 4417.99W S 54.40 W 8.92 1020.14S 4441.17W S 58.26 W 11.33 1035.96S 4464.91W S 58.58 W 1.46 1051.15S 4489.62W S 61.02 W 8.98 1065.33S 4514.00W 4530.63 4556.81 4583.52 4611.03 4637.99 10698 8941.12 8876.08 10728 8950.49 8885.45 10758 8958.79 8893.75 10789 8967.28 8902.24 10819 8975.53 8910.49 71 5 73 36 74 9 73 58 73 57 S 61.05 W 11.32 1079.81S 4540.17W S 61.74 W 8.43 1093.91S 4566.02W S 60.83 W 3.45 1107.71S 4591.21W S 61.11 W 1.07 1122.13S 4617.20W S 60.77 W 1.09 1136.08S 4642.30W 4666.75 4695.13 4722.79 4751.37 4778.98 10851 8984.36 8919.32 73 44 10882 8992.45 8927.41 76 27 10913 8998.67 8933.63 80 17 10944 9002.83 8937.79 84 24 10976 9005.64 8940.60 85 14 S 60.43 W 1.24 1151.04S 4668.85W S 60.66 W 8.67 1166.00S 4695.35W S 62.33 W 13.50 1180.42S 4721.89W S 63.07 W 13.37 1194.60S 4749.38W S 64.10 W 4.25 1208.43S 4777.22W 4808.23 4837.43 4866.55 4896.54 4926.79 11007 9008.16 8943.12 11038 9010.64 8945.60 11070 9013.03 8947.99 11101 9015.03 8949.99 11131 9016.54 8951.50 85 28 85 33 85 45 86 42 87 36 S 65.11 W 3.33 1221.74S 4805.24W S 65.10 W .23 1235.02S 4833.86W S 65.29 W .90 1248.22S 4862.44W S 64.98 W 3.27 1261.05S 4890.11W S 65.31 W 3.15 1273.85S 4917.73W 4957.10 4987.98 5018.81 5048.67 5078.47 11162 9017.65 8952.61 11192 9018.39 8953.35 11225 9018.98 8953.94 11255 9019.20 8954.16 11282 9018.65 8953.61 88 20 88 49 89 6 90 3 92 18 S 65.67 W 2.61 1286.78S 4946.10W S 65.76 W 1.66 1299.14S 4973.50W S 64.81 W 3.03 1312.78S 5003.14W S 63.94 W 4.22 1325.98S 5030.65W S 64.18 W 8.56 1337.49S 5054.31W 5109.04 5138.53 5170.48 5200.26 5225.92 RECEIVED APR - 5 ]995 ~taska Oil & Gas Cons. Commission Anchor~. , SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/E-15A ST2 500292066871 NORTH SLOPE COMPUTATION DATE: 4/3/9 DATE OF SURVEY: 121094 MWD SURVEY JOB JMBER: AK-MW-40093 KELLY BUSHING ELEV. = 65.04 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11314 9017.00 8951.96 93 39 S 65.08 W 5.07 1351.17S 5083.16W 11344 9016.12 8951.08 89 37 S 64.75 W 13.24 1364.07S 5110.73W 11375 9016.82 8951.78 87 45 S 63.71 W 6.95 1377.45S 5138.44W 11407 9017.58 8952.54 89 30 S 62.02 W 7.62 1392.00S 5166.83W 11438 9017.25 8952.21 91 43 S 63.52 W 8.67 1406.09S 5194.20W 5257.12 5286.90 5316.91 5347.87 5377.72 11472 9016.18 8951.14 91 54 S 63.22 W 1.03 1421.30S 5224.54W 11502 9014.83 8949.79 93 15 S 65.45 W 8.66 1434.32S 5251.64W 11529 9013.40 8948.36 92 47 S 64.56 W 3.68 1445.80S 5276.26W 11572 9011.33 8946.29 92 47 S 64.56 W .05 1464.04S 5314.61W 5410.72 5440.06 5466.65 5508.13 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 5512.58 FEET AT SOUTH 74 DEG. 35 MIN. WEST AT MD = 11572 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 256.90 DEG. TIE IN POINT 10,200' WINDOW POINT 10,290' INTERPOLATED DEPTH 11,572' INTERPOLATED FROM 10,320' TO 10530' AZIMUTHS INCLUSIVE SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/E-15A ST2 500292066871 NORTH SLOPE COMPUTATION DATE: 4/ 3/95 DATE OF SURVEY: 121094 JOB NI/MBER: AK-MW-40093 KELLY BUSHING ELEV. = 65.04 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 10200 8653.95 8588.91 11200 9018.54 8953.50 11572 9011.33 8946.29 943.99 S 4179.08 W 1546.05 1302.09 S 4980.04 W 2181.46 635.42 1464.04 S 5314.61 W 2560.67 379.21 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PBU/E-15A ST2 500292066871 NORTH SLOPE COMPUTATION DATE: 4/ 3/95 DATE OF SURVEY: 121094 JOB NUMBER: AK-MW-40093 KELLY BUSHING ELEV. = 65.04 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 10200 8653.95 8588.91 943.99 S 4179.08 W 1546.05 10213 8665.04 8600.00 943.87 S 4187.54 W 1548.91 2.86 10342 8765.04 8700.00 945.91 S 4268.63 W 1577.91 29.01 10511 8865.04 8800.00 990.44 S 4395.08 W 1646.19 68.27 10781 8965.04 8900.00 1118.37 S 4610.38 W 1816.65 170.46 11572 9011.33 8946.29 1464.05 S 5314.61 W 2560.67 744.03 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: David John~"', Chairmarf..~7 Blair Wondzell, ~'~~¢,~,~ P. I. Supervisor FROM: Lou Grimaldi?°'~ SUBJECT: Petroleum Inspector DATE: December 4, 1994 FILE NO: AHGJLDBD.DOC BOP Test Doyon rig 1/14 BPX well # E-15 Prudhoe Bay field PTD # 94-134 Sunday, December 4, 1994: I traveled to Doyon rig #14 to witness the weekly BOP test on their rig which is presently drilling BPX well # E-15 in the Prudhoe Bay Field. The rig was still coming out of the hole when I arrived. The test once staded went very well with all components functioning properly and holding their pressure test. The test lasted 2.5 hours with no failures observed. I found the rig to be in very good condition. Mark Egholm (Doyon Toolpusher) showed foresight in scheduling this test as it was not due for two more days. The rig was standing by for cement to cure and this test was performed as to give them a solid week of drilling without interuption. Summary: I witnessed the weekly BOP test on Doyon rig #14. Test time 2.5 hours. No failures. Attachment: AHGJLDBD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: DOYON Rig No. 14 PTD # BPX Rep.: E-15 Rig Rep.: Set @ Location: Sec. Weekly X Other DATE: 12/4/94 94-134 Rig Ph.# 659 - 4510/fax 4512 Dink Heirn Mark Egholm 6 T. 11N R. 14E Meridian U MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) Reserve Pit N lA Well Sign OK Drl. Rig OK BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Test Quan. Pressure P/F I 500/3000 P I 250/5000 P I 250/5000 P I 250/5000 P 3 250/5000 P 2 250/5000 P 3 250/5000 P MUD SYSTEM: Visual Alarm Trip Tank OK OK Pit Level Indicators OK OK Flow Indicator OK OK Gas Detectors OK OK Test FLOOR SAFETY VALVES: Quan. Pressure Upper Kelly /IBOP 1 1250/5000 Lower Kelly / IBOP 1 1250/5000 Ball Type 1 J25o/5ooo Inside BOP I 1250/5000 P/F P P P P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes 14 Test Pressure 250/5000 36 250/5000 1 P/F P P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure 0 System Pressure Attained 2 Blind Switch Covers: Master: Nitgn. Btl's: 4 ~ 2000 3,000 P 1,700 P minutes 53 sec. minutes 56 sec. YES Remote: YES Psig. Number of Failures: 0 ,Test Time: 2.5 Hours. Number of valves tested 26 Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: GOOD TEST Distribution: orig-Well File c - Oper./Rig c ~ Database c - Trip Rpt File c -Inspector FI-021L (Rev. 7/19) STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: AHGJLDBD.XLS Louis R Grimaldi CONSERVATION COMMISSION ALASKA OIL AND GAS  ANCIIORAGE, ALASKA 99501-3192 PItONE: (907)279-1433 TELECOPY: (907)276-7542 October 17, 1994 Adrian Clark Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit E-15A BP Exploration (Alaska), Inc. Permit No. 94-134 Sur. Loc. 903'SNL, 501'WEL, Sec. 6, TllN, R14E, UM Btmnhole Loc. 2448'SNL, 987'WEL, Sec. 1, TllN, R13E, UM Dear Mr. Clark: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector-on the North Slope pager at 659-3607. ~~a~r~R O~~F CO ~ISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of work Drill [] Redrill I-Illb. Type of well. Exploratory[-] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration ~ KBE = 67.06 feet Prudhoe Bay Field/Prudhoe 3. Address .. 6. Property Designation Bay Pool P. 0. Box 196612. Anchorage. Alaska 99519-~612 ADL 28280 4. Location of well at surface . :-~ 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 903' SNL, 501' WEL, SEC. 6, T11N, R14E Prudhoe Bay Unit At top of productive interval 8. Well number Number 2091' SNL, 451' WEL, SEC. 1, T11N, R13E E-15A (42-1-11-13) 2S100302630-277 At total depth 9. Approximate spud date Amount 2448' SNL, 987' WEL, SEC. 1, T11N, R13E 10/19/94 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property 15. Proposed depth (MD andTVD) property line ADL 28304 feet No close approach feet 2560 11688' MD/9022' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 A^C 25.035 (e)(2)) Kickoff depth ~o3oo feet Maximum hole an~le89.~ o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length M D TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 NSCC 1793' 9250' 7905' 11043' 9012' 6" 4-1/2" 12.6# 13CR8O NSCC 650' 11043' 9012' 11688' 9022' 328 sx Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary R ~ C ~,. IV ~ Ci Total depth: measured 10805 feet Plugs (measured) true vertical 9138 feet (.'~0'~- '1 0 ~99~ Effective depth: measured 10668 feet Junk (measured) true vertical 9026 feet .,.~.!:._~!:~ ,;~',I & G.% (;oas. Co.rnmissio~ 8 nr,hr~r Casing Length Size Cemented Measured depth T/'ue Vertical depth Structural Conductor 110' 20"x30" 8 cu yds Concrete 139' 139' S u rface 2642' 13-3/8" 3720 cu ft AS II 2671' 2671' I n t e r m e d i at e 9843' 9-5/8" 1415 cu ft "G" & 98 72' 8389' Production 130 cu ft AS I Lin e r 1424' 7" 468 cu ft "G" 9381 '- 10805' 8007'-9138' Perforation depth' measured 10565'-10590', 10600'-10650', 10660'-10668' (open) 10538'-10552' (squeezed) true vertical 8860'-8965' TVD SS (four intervals 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program~ Drilling fluid program [] Time vs depth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby correCt__true and correct to the best of my knowledge Signed Title Drilling Engineer Supervisor ~'~-~~ Date Commission Use Only Permit Number IAPI number IApproval date See cover letter /O~Z_ //,.~ ~,4 150- 0.2..~-,2. C)~<~ ~--~/ I /~'~ _./q..- ~ t.f for other requirements Condition§ of approval Samples required [] Yes [] No Mud Icg required []Yes ,ii] No Hydrogen sulfide measures [] Yes ~ NO Directional survey requ~reo [] Yes [] No Required working pressure for BOPE 1-12M; 1-13M; I~5M; I'-I10M; 1-115M; Other: Original Signed By by order of Approved by David W. Johnston Commissioner ~ne commission_ .Da!.e/.¢//_/?/~.~ Form 10-401 Rev. 12-1-85 Submit icate Well Name: E-15A Redrill Plan Summary IType of Redrill (producer or iniector): PRODUCER Surface 902.77 FNL 500.74 FEL S6 T11N R1 4E UM Location: Target Location: 2091.48 FNL 451.09 FEL S1 T11N Rq 3E UM Bottom Hole 2448.31 FNL 986.83 FEL S1 T11N R1 3E UM Location: AFE Number: 4P8012 IRig: I DOYON RIG #1 4 Estimated Start 1 90CT94 Date: Operating days to complete: 17 I'TVD: 9,022' I KBE: 1~7.o~' I Well Design (conventional, slimhole, etc.): HORIZONTAL SIDETRACK J.Objective J SADLEROCHIT Program: A 9.5 - 1 0.00 ppg Biozan polymer water based mud will be used. Special design IA NON-DAlVlAGING XANVIS POLYMER MUD AT 8.6-9.0 PPG considerations I WILL BE USED TO DRILL THE 6" HOLE INTERVAL. Depth Density PV YP INT IOMIN FL OIL I SOLIDS (TVD) (PPG) (CP) (#/FT) GEL GEL cc30/min (%)I (%) KOP' 9.0 12 40 10 20 6 0 5 to to to to to to to to to TD' 9.0 12 40 10 20 6 0 5 Directional: IKOP: ! 10,300' Maximum Hole Angle: Close Approach Well' MD/8,731' TVD 89.1° NONE The above listed wells will be secured during the close approach. Casing/Tubing Program: Hole. Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/TVD MD/TVD 6" 4-1/2_" 13CR- NSCC 650' 11043'/9012_' 11 688'/9022_' 80 6" 4-1/2" L-80 NSCC 1 793' 92_50'/7905' 11043'/901Z' ,, , TUBING 4-1/2." 12.6# L-80 TDS OR 9,200' SURFACE 9200'/7867' BTC-MOD .. , . Cement Calculations: Liner 4-1 / 2" Size: Basis: above liner with DP. Total Cement 3 Z8 i Volume: 50% open hole excess, 80' shoe joint, 1 50' liner lap and 1 50' excess sxs of Class G Blend 1.1 7. ft3/sx ILiner Size' Basis: I I above liner with DP. Total Cement ! Volume: 50% open hole excess, 80' shoe joint, 1 50' liner lap and 1 50' excess sxs of Class G Blend 1.1 7. ft$/sx Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. SUMMARY PROCEDURE: . Z. 3. 4. 5. 6. 7. 8. . 10. ll. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. Pre-rig work. RU slickline unit. WLIH and install a plug in the 4-1/2" XN nipple in the + , tailpipe at _9409 md'. WLOH. WLIH and punch circulating holes in the 7" tubing at _+9270' md in the middle of the first full joint above the packer. WLOH and RD slickline. Freeze protect tubing and annulus to 2000' md/tvd and set a BPV. Move in drilling rig. Pull BPV. Circulate diesel freeze protection cap from well and recover for future use. Install a BPV and tree test plug. Remove the production tree. Install BOP's and test to 5000 psi. Remove the test plug and BPV. Shear SBR. Pull and lay down the 7'-- tubing. Recover slickstick/anchor. Mill and retrieve packer. Displace well to milling fluid. Cut a 50' section in the 7'__~' casing starting from about +_IO.;~O0'MD. RIH with 2-7/8", 8.7#, DSS tubing and lay a cement plug from PBTD across and above the section up to -+9963' md. This plug will serve as both the abandonment plug and the kickoff plug. Squeeze away approximately 5 bbl cement to abandon perforations leaving the top opf cement before drilling out at -+10,100' md which is 200' above top of window. Run in with an 4-3/4" steerable drilling assembly and a 6" bit with gamma ray/directional MWD and dress the cement to 5' below the section top. Kickoff and if necessary displace well to a clean FLO-PRO system. Continue to directionally drill to TD at +_11,688' md which should yield _+644' of horizontal section (see attached directional plan). Make a conditioning trip with a 6" hole-opener for the open hole section and with a 9-5/8" casing scraper spaced to clean the casing. Install a 4-1/2". 17_.6#. L-80. NSCT solid liner x 4-1/2". L-80 slotted liner with 4- 1/2" X 9-5/8" packer/hanger. Space packer / hanger to be set at _+9,2_75' md. Cement the liner in place with the total cement volume based upon 50 % open-hole enlargement plus the 80' shoe volume, 150' lap volume and 150' excess on top of the liner with drillpipe in the hole. Set hanger, inflate CTC packer. Re-test BOP's as needed. RIH and cleanout Displace well to seawater. Run the 4-1/2" L-80 completion string assembly utilizing as much used 4-1/2" tubing as possible. Space out and circulate with corrosion inhibitor. Install a BPV and test plug. Remove BOP's. Install and test the production tree to 5000 psi. Pull tree test plug and BPV. Set packer. Test the tubing x casing annulus to 3500 psi for 30 minutes. Shear RP valve in the upper GLM and freeze protect the well. Set a BPV. Release rig. Complete appropriate documentation and hand-over to Production. Prudhoe Bay Drilling Prudhoe Bay Unit E-PAD E-~5A Wp8 (Medium VERTICAL VIEW sc~z ~o m/ VERTICAL SECTION REF: I~ELLI~Jd) Radius) HALLIBURTON Target Name TVD NS EW Grid X Gold Y J I End oF Horz. 9022 1546 S 5374 W 659124 5974500 CRITICAL PDINT DATA 4331 36.97' E 1030O HD KO? / TIE IN / START OF CURVE R 1o.ooo/100 Fl 39.34' R 10330 HD 41,77' ~ 10360 MD MD lnc Az;. TVD N/S E/~ KOP / TIE IN / 10300 36.97' 270.72' 8731 943 S 4236 START OF CURVE ~ 10.00'/100 Pt PGOC 10546 57.81' 858.69' 8897 974 S 4411 ZONE 1 - lB 10655 67.69' ~47,4~' 8947 1007 S 450~ END DF CURVE 1082~ 83.07' 240.60' 8989 1078 S 4647 Star~ horz./ 10970 83.07' ~40.60' 9007 1150 S 4775 START DF CURVE ~ 10.00'/100 ~ END DF CURVE 11044 89,11' 836.35' 9012 1189 S 4838 End o? Horz. 11688 89.11' 236.35' 902~ 1546 S 5374 850 44,E7' E 10390 lid ~46.81' E ID4EO MD k~4,.3,' , I0450 MD  ~ 10 ilo MD - ~ ~]~ . ~ ~Li' e 10600 ~ a~~ ~~/~;-- - -~ . 67,69' i 10655 MD ~NE I - lB ~ ~ 10750 MD F v BgB~ ......... 4764 .......... B~.D7' E 108~ ND [ND B C~ E ........... 559~ m 9100 { 4~0 41'00 41~0 4~'00 V'ER?ICAL S~CIION PL&~'E: 258.96 55'00 55~0 56'00 f,~oo oo oo oo § els · ·  o o 000 . ~ / . ~ - ~. O GOreD0 64~00 63~00 6~Jo0 61moo 60iOO 59{00 58'00 57'00 56i00 55100 54100 53moo 5E~OO 51'00 5D'D0 PROPOSED BI-IL SURFACE LOCATION -"' TVD 90:~2.06 Dote ' -- -- Verified By ' (~'~ MD 11687.96 ASP -- XI 664463.00 V~ 5591.79 Y. 5976160.99 N/S 1545.5o s Designed by ' $,:B~,5... Y,.o.g Certified By ' E/W 5373.97 W RKB Ft, 6%06 STATE OF ALASKA ,' .. ALAr OIL AND GAS CONSERVATION COMMISSl APPLICA"i FOR SUNDRY APPROVALS 1. Type of Request: Abandon X Suspend ~ Operation Shutdown__ Re-enter suspended well__ Alter casing ~ Repair well __ Plugging X Time extension Stimulate __ Change approved program __ Pull tubing ~ Variance__ Perforate Other X ~ Plugbacl for redrlll 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 6. Datum elevation (DF or KB) KBE = 60. 74' AMSL 5. Type of Well: Development x Exploratory __ Stratigraphic __ Service 10. 11. 7. Unit or Properly name Prudhoe Bay Unit 4. Location of well at surface 8. 903'SNL, 501' WEL, SEC. 6, T11N, R14E At top of productive interval 1848' SNL, 293' EWL, SEC. 6, T11N, R14E At effective depth 1842' SNL, 61' WEL, SEC. 1, T11N, R13E At total depth 1840' SNL, 147' WEL, SEC. 1, T11N, R13E Well number E-15 (42-01-11-13) Permitnumber 81-151 APInumber 50- 029-20668 Field/Pool Prudhoe Bay Field/Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10805 feet 9138 feet 10668 feet 9026 feet Plugs (measured) Junk (measured) Fill @ 10668' MD (4/89) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 110' 20" x 30" 8 cu yds Concrete 2642' 13-3/8" 3720 cuft AS fl 9843' 9-5/8" 1415 cu f~ "G"/13o cuff AS I 1424' 7" 468cu fl C~ss"G" measured 10565~10590; 10600~10650~ 10660'-10668'(Open) 10538'-10552'¢queezed) true vedical 8860'-8965' TVD ss(four~tervals) Tubing (size, grade, and measured depth) 7", L-80 ro 9293'; 4-1/2"tailpipe to 94.53'MD Measured depth True vertical depth 139' 139' 2671' 2671' 9872' 8389' 9381 '- 10805' 800 7'-9138' 0C1' 1 0 '~994 A~,¢~ 0il & Oas Cons. Commission Anch0rcde Packers and SSSV (type and measured depth) 9-5/8", Baker packer @ 9293'MD; 4-1/2" Otis SSSV @ 1999'MD 13. Attachments Description summary of prop. os&~ co m m e r~cing (~-ej'_aii~)n '/)-._.- -~ .... \~ 14. Estimated date for x,,:~-/ 16. If proposal was verbally approved Name of approver Date approved Detailed operations program BOP sketch 15. Status of well classification as: Oil x Gas .. Suspended Service 17. i hereby certify that the foregoing is true and correct to the best of my knowledge. ' Signed ~ .- '-, ~ .-- Title Drilling Engineer Supervisor ~t ~ ' '~ ' FOR COMMISSION USE ONLY ~ Conditions of approval: Notify Commission so representative may witness J Ap~v~ I Plug integrity__ BOP Test Mechanical Integrity Test__ ,...¢. Approved by order of the Commission Local/on clearance SUbsequent form required 10- Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE WELL PERMIT CHECKLIST PROGRAM: exp [] dev [] redrll ~ serv [] ON/O ADMINISTRATION , # 1. Permit fee attached .... ............... 2. Lease number appropriate ................ 3. Unique well name and number ............... 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ...... ' 7. Sufficient acreage available in drilling unit ...... 8. If deviated, is wellbore plat included ......... 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order ..... 12. Permit can be issued without administrative approval. 13. Can permit be approved before 15-day wait ....... ENGINEERING 15. Surface casing protects all known USDWs' 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate ........... 24. Drilling fluid program schematic & equip list adequate .~ N 25. BOPEs adequate ..................... 26. B6PE press rating adequate; test to psig.~ 27. Choke manifold complies w/API RP-53 (May 84) ....... 28. Work will occur without operation shutdown ....... 29. Is presence of H2S gas probable ............. GEOLOGY APPR DATE. 30. Permit can be issued w/o hydrogen sulfide measures .... YN//,~ 31. Data presented on potential overpressure zones ..... Y ' ./~ 32. Seismic analysis 9f shallow gas zones .......... 33. Seabed condition survey (if off-shore) ........ 34. Contact name/phone for weekly progress reports .... /. Y [exploratory only] GEOLqGY: ENGINEERIN~: COMMISSION: Comments/Instructions: HOW/jo - A:~FORMS~cheklist rev 03/94 · . Z 0 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. .. No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 6539.00 T. MCGUIRE D. HEIM E-15A 500292066801 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 12-DEC-95 MWD RUN 7 T. MCGUIRE D. WESTER MWD RUN 8 T. MCGUIRE D. WESTER MWD RUN 9 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD T. MCGUIRE D. WESTER 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 6 liN 14E 903 OPEN HOLE 501 35.93 34.33 30.21 REMARKS: IdlCR'bFILM ED CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 9.625 9381.0 7.000 10292.0 11685.0 MWD - NGP (GR). ALL DEPTHS ARE MEASURED BIT DEPTHS. WINDOW MILLED IN 7" CASING FROM 10290' TO 10340' MD. DGWD RUNS 6, 7, 8, & 9 REPRESENT THIS WELL, E-15A. DGWD RUNS 1, 2, 3, & 4 REPRESENT THE WELL E-15A PB1. DGWD RUNS 6, 7, & 8 REPRESENT THE WELL E-15A PB2. ALL RUNS WERE DIRECTIONAL WITH NGP GAMMA RAY. NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 10249.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REMARKS: STOP DEPTH 11635.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 6 10290.0 10363.0 7 10363.0 10578.0 8 10578.0 10593.0 9 10593.0 11685.0 MERGED MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 I AAPI ROP MWD 68 i FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 8 * DATA RECORD (TYPE# 0) Total Data Records: 35 1014 BYTES * Tape File Start Depth = 11687.000000 Tape File End Depth = 10248.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8638 datums Tape Subfile: 2 126 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10249.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10321.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 6. 06-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 10363.0 10290.0 10363.0 0 38.7 44.1 TOOL NUMBER NGP 168 6.000 10292.0 KCL-BIOPOLYMER 9.10 75.0 11.2 28000 5.4 .000 .0 .000 46.9 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 8 * DATA RECORD (TYPE# 0) Total Data Records: 1014 BYTES * Tape File Start Depth = 10365.000000 Tape File End Depth = 10248.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 Tape Subfile: 3 Minimum record length: Maximum record length: 706 datums 66 records... 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10318.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10536.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 7. 07-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 10578.0 10363.0 10578.0 0 47.0 64.2 TOOL NUMBER NGP 168 6.000 10292.0 KCL-BIOPOLYMER 9.00 66.0 9.0 32000 5.0 .000 .0 .000 49.2 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 * DATA RECORD (TYPE# 0) Total Data Records: 1014 BYTES * Tape File Start Depth = 10600.000000 Tape File End Depth = 10300.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10442 datums Tape Subfile: 4 71 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10525.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIM UMANGLE: STOP DEPTH 11524.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 8. 09-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 11574.0 10578.0 11574.0 0 64.3 93.2 TOOL NUMBER NGP 145 6.000 10292.0 KCL-BIOPOLYMER 9.00 70.0 9.1 30000 5.2 .000 .0 .000 58.6 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT DATA BELOW KOP OF 10593' MD IS FROM THE WELL E-15A PB2. $ : BP EXPLORATION (ALASKA) : E-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 * DATA RECORD (TYPE# 0 ) Total Data Records: 26 1014 BYTES * Tape File Start Depth = 11580.000000 Tape File End Depth = 10520.000000 Tape File Level Spacing = 0.500000 'Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7070 datums Tape Subfile: 5 90 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10534.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11635.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 9. 12-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 11685.0 10593.0 11685.0 0 65.6 92.3 TOOL NUMBER NGP 168 6.000 10292.0 KCL-BIOPOLYMER 9.00 70.0 9.1 30000 5.2 .000 .0 .000 58.6 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 8 * DATA RECORD (TYPE# 0) Total Data Records: 28 1014 BYTES * Tape File Start Depth = 11687.000000 Tape File End Depth = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17388 datums Tape Subfile: 6 91 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS 95/12/12 01 **** REEL TRAILER **** 95/12/12 O1 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 12 DEC 95 3:32p Elapsed execution time = 1.20 seconds. SYSTEM RETURN CODE = 0 l'aPe SUbfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 6540.00 T. MCGUIRE D. WESTER 500292066870 BP EXPLORATION (ALASKA) INC. MWDRuNSPERRY-SUN12_DEC_95 2 DRILLINGMwDRuNSERVICE~~/~3 T. MCGUIRE D. HEIM T. MCGUIRE D. HEIM JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 4 T. MCGUIRE D. HEIM OPEN HOLE 6 liN 14E 903 501 35.93 34.33 30.21 CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 6.000 REMARKS: MWD - NGP (GR) . 1% I%V I I ill'l II 9.625 938~ .ooo 10621. ALL DEPTHS ARE MEASURED BIT DEPTHS. WINDOW MILLED IN 7" CASING FROM 10290' TO 10340' MD. DGWD RUNS 1, 2, 3, & 4 REPRESENT THIS WELL, E-15A PB1. DGWD RUNS 6, 7, 8, & 9 REPRESENT THE WELL E-15A. DGWD RUNS 6, 7, & 8 REPRESENT THE WELL E-15A PB2. ALL RUNS WERE DIRECTIONAL WITH NGP GAMMA RAY. NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 10240.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: STOP DEPTH 10571.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 10292.0 10425.0 2 10425.0 10528.0 3 10528.0 10581.0 4 10581.0 10621.0 MERGED MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 * DATA RECORD (TYPE# 0) Total Data Records: 10 1014 BYTES * Tape File Start Depth = 10622.000000 Tape File End Depth = 10238.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 2308 datums Tape Subfile: 2 101 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes o£ape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10238.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10375.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 1. 01-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 10425.0 10292.0 10425.0 0 37.0 42.0 TOOL NUMBER NGP 168 6.000 10292.0 KCL 9.00 180.0 11.2 30800 8.0 .000 .000 .000 .000 .0 51.6 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 4 4 90 310 01 1 4 90 810 01 1 Tape File Start Depth = 10405.000000 Tape File End Depth = 10238.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1006 datums Tape Subfile: 3 67 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10375.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10478.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 2. 02-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 10528.0 10425.0 10528.0 0 42.0 45.4 TOOL NUMBER NGP 168 6.000 10292.0 KCL-BIOPOLYMER 9.10 63.0 9.3 31500 5.8 .000 .0 .000 51.6 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 8 * DATA RECORD (TYPE# 0) Total Data Records: 1014 BYTES * Tape File Start Depth = 10525.000000 Tape File End Depth = 10370.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3242 datums Tape Subfile: 4 67 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10478.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10537.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 3. 03-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 10581.0 10528.0 10581.0 0 45.6 45.7 TOOL NUMBER NGP 168 6.000 10292.0 KCL-BIOPOLYMER 9.10 63.0 9.3 31500 5.8 .000 .0 .000 51.6 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 3 Tape File Start Depth = 10590.000000 Tape File End Depth = 10475.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1700 datums Tape Subfile: 5 66 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10531.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10571.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OEMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 4. 03-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 10621.0 10581.0 10621.0 0 45.3 45.3 TOOL NUMBER NGP 145 6.000 10292.0 KCL-BIOPOLYMER 9.00 66.0 9.3 32000 4.8 .000 .0 .000 46.9 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR * DATA RECORD (TYPE# 0) Total Data Records: 1014 BYTES * API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 Tape File Start Depth = 10622.000000 Tape File End Depth = 10530.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3798 datums Tape Subfile: 6 66 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 7 is type: LIS 95/12/12 01 **** REEL TRAILER **** 95/12/12 01 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 12 DEC 95 3:38p Elapsed execution time = 0.88 seconds. SYSTEM RETURN CODE = 0 _.a Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 6 6541.00 T. MCGUIRE D. HEIM E-15A PB2 500292066871 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 12 -DEC- 95 ? T. MCGUIRE D. WESTER T. MCGUIRE D. WESTER 6 liN 14E 903 501 35.93 34.33 30.21 lST STRING 2ND STRING 3RD STRING PRODUCTION STRING 6.000 REMARKS: MWD - NGP (GR) . OPEN HOLE CASING RUtlLHZU BIT SIZE (IN) SIZE (IN)DEP~~' 9.625 93 .ooo 1157 0 ALL DEPTHS ARE MEASURED BIT DEPTHS. WINDOW MILLED IN 7" CASING FROM 10290' TO 10340' MD. DGWD RUNS 6, 7, & 8 REPRESENT THIS WELL, E-15A PB2. DGWD RUNS 6, 7, 8, & 9 REPRESENT THE WELL E-15A. DGWD RUNS 1, 2, 3, & 4 REPRESENT THE WELL E-15A PB1. ALL RUNS WERE DIRECTIONAL WITH NGP GAMMA RAY. NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. .£LE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 10249.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: STOP DEPTH 11524.0 EQUIVALENT UNSHIFTED DEPTH - BIT RUN NO MERGE TOP MERGE BASE 6 10290.0 10363.0 7 10363.0 10578.0 8 10578.0 11574.0 MERGED MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves-. Name Tool Code Samples Units GR MWD 68 i AAPI ROP MWD 68 I FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 8 * DATA RECORD (TYPE# 0) Total Data Records: 32 1014 BYTES * Tape File Start Depth Tape File End Depth = 11575.000000 = 10248.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7966 datums Tape Subfile: 2 117 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes ~ape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10249.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10321.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 6. 06-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 10363.0 10290.0 10363.0 0 38.7 44.1 TOOL NUMBER NGP 168 6.000 10292.0 KCL-BIOPOLYMER 9.10 75.0 11.2 28000 5.4 .000 .0 .000 46.9 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT BP EXPLORATION (ALASKA) E-15A PB2 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 3 Tape File Start Depth = 10365.000000 Tape File E~d Depth = 10248.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 Tape Subfile: 3 Minimum record length: Maximum record length: 706 datums 66 records... 62 bytes 1014 bytes l'ape Subfile 4 is type: LIS FILE HEADER FI LE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10318.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10536.0 07-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 10578.0 10363.0 10578.0 0 47.0 64.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP 168 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 10292.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL-BIOPOLYMER 9.00 66.0 9.0 32000 5.0 .000 .0 .000 49.2 .000 .0 .000 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 7. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 2 ROP MWD 68 1 AAPI 1 FPHR 4 4 90 310 01 1 4 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10600.000000 Tape File End Depth = 10300.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9770 datums Tape Subfile: 4 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH NGP 10525.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11524.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 8. 09-DEC-94 MSC 1.32 DEP 2.041 NGP 5.74 MEMORY 11574.0 10578.0 11574.0 0 64.3 93.2 TOOL NUMBER NGP 145 6.000 10292.0 KCL-BIOPOLYMER 9.00 70.0 9.1 30000 5.2 .000 .0 .000 58.6 .000 .0 .000 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : E-15A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 90 310 01 1 4 4 90 810 01 1 * DATA RECORD (TYPE# 0) Total Data Records: 26 1014 BYTES * Tape File Start Depth = 11575.000000 Tape File End Depth = 10520.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7040 datums Tape Subfile: 5 89 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes £ape Subfile 6 is type: LIS 95/12/12 01 **** REEL TRAILER **** 95/12/12 01 TaPe Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 12 DEC 95 9:09a Elapsed execution time = 0.99 seconds. SYSTEM RETURN CODE = 0 * ALASKA COMPUTING CENTER * * . ****************************** * ............................ . ....... SCHLUMBERGER ....... * ............................ * ****************************** F ECEiVED SEP 0 5 1997 Ai~ka Oil & Gas Cons. CofflmL~ Anchorage COMPANY NAME '. BP EXPLORATION WELL NAME : E-15A FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API IVU~ER : 500292066801 REFERENCE NO '. 97345 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE - 97/09/ 3 ORIGIN : FLIC REEL NA~i~ : 97345 CONTINUATION # : PREVIOUS REEL : CO~IF2~T : BP EXPLORATION, PRUDHOE BAY, E-15A, API #50-029-20668-01 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/09/ 3 ORIGIN : FLIC TAPE NA~i~ : 97345 CONTINUATION # : 1 PREVIOUS TAPE : COM~iEN~T : BP EXPLORATION, PRUDHOE BAY, E-15A, API #50-029-20668-01 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINELOGS WELL NA~E: E-15A API NUMBER: 500292066801 OPERATOR: BP EXPLORATION LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 3-SEP-97 JOB ~ER: 97345 LOGGING ENGINEER: S.MORRISON OPERATOR WITNESS: K. BULLOCH SURFACE LOCATION SECTION: 6 TOWNSHIP: liN RANGE: 14E FNL: 903 FSL: FEL: 501 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 60.74 DERRICK FLOOR: GROUND LEVEL: 30.21 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 6. 000 4. 500 10950.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(~iEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: MWD LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 6-DEC- 94 LOGGING COMPANY: SPERRY SUN BASELINE DEPTH 88888.0 10797.5 10787.0 10785.5 10779.5 10772.0 10758.0 10752.5 10745.0 10741.5 10734.0 10732.0 10724.5 10722.5 10720.0 10719.5 10699.5 10697.5 10677.5 10665.5 10664.5 10662.5 10656.5 10652 0 10633 0 10602 0 10550 5 10533 5 10529 5 10519 0 10518 0 10507 0 10494 0 10480 5 10472 0 10461.5 10448.5 10447.5 10436.5 10435.5 10433.0 10429.0 10403.0 10402.0 10398.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GR CH CNTD .............. 88882.0 88882.0 10791.5 10791.5 10780.5 10780.5 10772.5 10772.5 10766.0 10766.0 10754.5 10754.5 10748.0 10748.0 10737.0 10737.0 10735.5 10735.5 10727.5 10719.0 10727.5 10719.0 10715.5 10715.5 10696.5 10696.5 10695.5 10695.5 10677.0 10677.0 10665.0 10665.0 10662.0 10662.0 10656.0 10656.0 10650.5 10650.5 10631.0 10631.0 10600.0 10600.0 10551.0 10551.0 10534.0 10534.0 10530.0 10530.0 10519.5 10519.5 10508.5 10508.5 10496.0 10496.0 10481.0 10481.0 10473.5 10473.5 10463.0 10463.0 10449.0 10449.0 10439.0 10439.0 10434.0 10434.0 10431.5 10431.5 10404.5 10404.5 10401.0 10401.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 10370.5 10373.5 10373.5 10363.5 10367.0 10351.5 10355.0 10355.0 10342.5 10344.5 10344.5 10340.0 10341.5 10339.5 10341.5 10338.0 10340.0 10337.0 10340.0 10336.5 10337.5 10334.5 10336.5 10336.5 10329.0 10332.5 10326.5 10329.0 10329.0 10316.5 10318.5 10315.5 10318.5 10315.0 10317.0 10297.5 10300.0 10296.5 10300.0 10290.0 10294.0 10294.0 10276.0 10279.5 10279.5 10268.5 10271.0 10267.5 10271.0 100.0 102.5 103.5 $ CONTAINED HERIN IS THE CNTD DATA ACQUIRED ON BP EXPLORATION WELL E-15A. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #1 GRCH TO GR.MWD; AND PASS #1 NPHI TO GR.MWD. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : ! 024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUM~ER: 1 DEPTH INCREMENT: 0.5000 FILE SO?4MARY LDWG TOOL CODE START DEPTH GRCH 10823.0 CNTD 10835.0 STOP DEPTH 9810.0 981 O. 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD REMARKS: THIS FILE CONTAINS CNTD PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELaM CODE (HEX) DEPT FT 572381 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-S 572381 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTD 572381 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 572381 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTD CPS 572381 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: NAN~ SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUY4B SAMP ELE~ CODE (HEX) FCNT CNTD CPS 572381 CFTC CNTD CPS 572381 CNTC CNTD CPS 572381 GRCH CNTD GAPI 572381 TENS CNTD LB 572381 CCL CNTD V 572381 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10829.000 NPHI. CNTD 18.746 NRAT. CNTD 3.900 CRAT. CNTD NCNT. CNTD 5066.950 FCNT. CNTD 1299.323 CFTC. CNTD 1134.501 CNTC. CNTD GRCH. CNTD -999.250 TENS.CNTD 1525.000 CCL.CNTD 0.000 DEPT. 9812.500 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 33.003 TENS.CNTD -999.250 CCL. CNTD -999.250 3.584 4508.563 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: DEPTH INCREM~_~Ff: 0.5000 FILE SUB~L~RY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10735.0 9810.0 CNTD 10747.0 9810.0 $ CURVE SHIFT DATA - PASS TO PASS (M~ASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUFiBER : 1 BASELINE DEPTH 88888.0 10740.5 10730.5 10723.0 10721.5 10720.5 10715.0 10711.5 10702.0 10698.0 10696.0 10694.5 10693.5 10687.0 10685.5 10677.5 10674.0 10673.0 10670.0 10665.5 10664.5 10662.0 10657.0 10645.0 10637.0 10633.5 10633.0 10631.5 10616.5 10609.0 10605.5 10601.0 10592.5 10586.5 10559.0 10556.5 10554.5 10551.5 .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTD 88882.0 88887.5 10740.0 10724.5 10718.0 10716.0 10720.0 10712.5 10711.5 10700.5 10696.5 10695.5 10693.0 10691.5 10685.5 10684.0 10676.5 10674.0 10672.0 10668.0 10665.0 10665.0 10661.5 10656.5 10641.5 10636.5 10631.5 10632.0 10628.5 10615.0 10615.5 10607.5 10602.0 10600.0 10592.0 10585.5 10558.5 10554.5 10553.0 10551.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 10547.5 10546.0 10536.0 10535.5 10530.0 10530.0 10518.5 10520.0 10518.0 10519.5 10515.0 10516.0 10508.5 10508.5 10494.0 10496.0 10493.5 10495.5 10478.5 10480.0 10473.5 10476.0 10466.0 10467.0 10458.0 10459.5 10450.0 10451.0 10447.0 10449.0 10443.5 10446.5 10441.5 10443.0 10436.0 10438.0 10435.0 10437.5 10430.5 10429.5 10417.0 10419.0 10416.0 10413.0 10392.5 10390.0 10377.5 10380.0 10366.5 10369.5 10355.5 10352.5 10343.5 10341.5 10338.0 10336.5 10337.0 10340.0 10316.0 10318.5 10300.5 10303.5 10299.0 10299.5 10290.0 10295.5 10286.0 10290.0 10272.0 10275.5 10266.5 10269.5 10254.5 10259.0 10248.5 10252.5 10242.0 10245.5 10245.5 10236.0 10240.0 10233.0 10236.5 10229.5 10233.5 10211.5 10215.0 10193.0 10196.0 10191.5 10195.5 10180.5 10184.5 10172.0 10175.0 10171.5 10175.0 10159.5 10162.0 10158.5 10162.0 10149.5 10153.5 10148.5 10151.0 10145.5 10148.5 10145.0 10148.5 10143.0 10146.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 10140.0 10138.5 10136.5 10129.0 10126.0 10110 0 10103 5 10101 5 10095 5 10087 5 10087 0 10085 0 10081 0 10077 5 10075 0 10070 5 10069 5 10067 0 10064 5 10061 5 10057 0 10053.0 10052.0 10050.5 10047.0 10046.5 10045.0 10043.0 10039.0 10037.5 10033.5 10031.5 10025.0 10022.0 10021.0 10019.0 10012.0 10008.0 10006.0 10003.0 10001.5 9997.0 9994.5 9993.0 9990.5 9980.0 9977.5 9973.5 9957.5 9946.0 9940.5 9938.0 9935.5 9931.0 9927.5 10142.0 10138.5 10131.5 10104.0 10098.0 10089.0 10087.0 10083.0 10079.5 10077.0 10070.5 10066.0 10059.0 10055.5 10054.0 10052.5 10049.0 10046.5 10046.0 10039.5 10035.5 10027.0 10023.5 10021.0 10007.5 9996.5 9991.5 9982.5 9978.5 9973.5 9958.5 9947.5 9943.0 9940.0 9937.5 9932.5 10142.0 10129.5 10113.0 10106.5 10090.5 10088.0 10083.5 10072.5 10070.5 10064.5 10055.0 10050.0 10041.0 10033.5 10024.0 10015.0 10011.5 10005.0 10003.5 10000.0 9995.5 9938.0 9933.5 9930.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PA GE: 9926.5 9928.0 9920.0 9919. $ 9914.0 9916.0 9912.5 9914.0 9909.0 9911.5 9907.0 9908.0 9898.5 9899.5 9898.0 9899.5 9894.5 9896.5 9880.5 9883.0 9874.0 9876.0 9864.5 9866.0 9861.5 9864.5 9860.5 9861.5 9858.0 9860.0 9848.0 9850.0 9851.5 9841.5 9843.0 9839.5 9842.0 9839.0 9840.5 9835.0 9836.5 9823.0 9825.0 9822.5 9825.5 9820.0 9822.0 9816.0 9819.0 100.0 102.0 103 . 0 $ REMARKS: THIS FILE CONTAINS CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #2 GRCH TO PASS #1 GRCH; AND PASS #2 NPHI TO PASS #1 NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE '. 10 TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAIVE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 572381 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 572381 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 572381 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 572381 O0 000 O0 0 2 1 1 4 68 0000000000 NCNTCNTD CPS 572381 O0 000 O0 0 2 1 1 4 68 0000000000 FCNTCNTD CPS 572381 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 572381 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 572381 O0 000 O0 0 2 1 1 4 68 0000000000 GRCHCNTD GAPI 572381 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 572381 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 572381 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10746.500 NPHI.CNTD 21.088 NRAT. CNTD 3.841 CRAT. CNTD NCNT. CNTD 4454.836 FCNT. CNTD 1159.775 CFTC. CNTD 1012.656 CNTC. CNTD GRCH. CNTD -999.250 TENS.CNTD 1418.000 CCL. CNTD 0.000 DEPT. 9812.000 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 32.410 TENS. CNTD -999.250 CCL. CNTD -999.250 3.898 4021.807 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION · O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 11 **** FILE HEADER **** FILE NAP4~ : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ~ER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INC~: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10789.0 9812.0 Cl~TD 10801.0 9812.0 CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUblBER .. 1 BASELINE DEPTH 88888.0 10787.5 10785.5 10783.5 10780.5 10778.5 10777.5 10773.5 10763.5 10756.5 10755.0 10753 0 10744 5 10733 5 10724 0 10722 5 10720 5 10719 5 10714 0 10713.5 10698.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD .............. 88884.5 88882.5 10784.0 10780.5 10774.5 10773.0 10768.5 10760.0 10750.0 10748.0 10727.5 10719.0 10718.0 10715.5 10711.0 10778.0 10772.0 10750.0 10740.0 10717.0 10711.5 10696.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 12 10697.5 10695.0 10693.0 10693.0 10685.5 10684.0 10677.5 10677.0 10677.0 10676.5 10671.0 10669.5 10666.0 10665.5 10662.5 10664.5 10658.0 10657.5 10657.5 10657.5 10648.5 10646.5 10638.0 10636.5 10631.5 10629.0 10623.0 10624.5 10622.0 10620.0 10617.5 10615.5 10607.5 10605.5 10603.0 10603.0 10598.5 10598.5 10587.0 10587.0 10577.5 10579.0 10572.0 10571.5 10566.5 10566.0 10551.0 10553.0 10551.0 10542.0 10543.5 10523.5 10525.0 10518.5 10519.5 10518.0 10519.5 10507.0 10508.0 10494.5 10496.0 10493.5 10495.0 10483.5 10485.0 10480.5 10480.5 10474.5 10476.0 10471.0 10471.0 10461.5 10463.5 10446.0 10449.0 10439.5 10441.5 10438.5 10442.0 10436.5 10439.0 10435.5 10438.0 10430.5 10432.0 10421.5 10421.5 10414.0 10415.5 10390.5 10393.5 10354.0 10355.0 10337.0 10340.0 10336.0 10340.0 10318.0 10320.0 10317.5 10319.5 10303.0 10306.0 10298.5 10303.5 10286.0 10290.0 10282.5 10287.5 10276.5 10280.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 13 10273.0 10277.5 10257.0 10260.5 10241.5 10245.5 10235.5 10240.0 10234.0 10237.0 10229.0 10233.5 10200.5 10204.5 10193 . 0 10196.5 10192.5 10196.0 10182.0 10186.5 10180.0 10184.5 10172.0 10175.5 10171.0 10175.0 10159.0 10162.0 10158.0 10162.0 10153.0 10155.5 10148.0 10151.0 10147.0 10151 . 0 10145.5 10148.5 10139.0 10141 . 5 10138.5 10143.0 10136.0 10138.5 10131.5 10135.0 10128.5 10131.5 10128.0 10132.0 10123.0 10125.0 10122.0 10125.5 10102.0 10106.0 10100.5 10104.0 10097.0 10100.5 10087.5 10090.0 10086.5 10090.0 10084.0 10087.0 10076.5 10079.5 10079.5 10070.0 10073.5 10069.0 10073.0 10065.0 10068.0 10064.0 10066.5 10062.5 10065.0 10061.0 10064.5 10057.5 10060.0 10052.5 10055.5 10051.5 10054.0 10051.0 10054.5 10050.0 10052.5 10046.5 10049.0 10045.5 10050.5 10042.5 10045.5 10037.5 10041.5 10036.5 10039.5 10033.0 10035.5 10024.0 10027.0 10023.0 10025.0 10022.0 10025.5 10021.5 10023.5 LIS Tape Verification Listing Schlumberger Alaska Computing Ceuter 3-SEP-1997 12:28 PAGE: 14 10020.0 10023.5 10016.5 10019.5 10011 . 0 10014.0 10005.0 10007.5 10004.0 10005.5 9996.5 10000.0 9994.0 9996.5 9990.0 9991.5 9993.5 9988.0 9988.0 9984.5 9986.5 9972.5 9973.5 9967.0 9968.0 9956.5 9958.0 9945.5 9948.0 9943.5 9947.0 9939.5 9942.5 9937.0 9939.5 9935.0 9938.0 9934.5 9937.5 9933.0 9936.5 9930.0 9932.5 9933.0 9924.5 9928.5 9924.0 9926.5 9919.0 9923.5 9912.0 9914.5 9905.5 9908.0 9899.0 9903.0 9896.5 9899.5 9894.5 9897.0 9893.0 9897.5 9887.0 9892.5 9882.0 9883.0 9879.5 9881.5 9877.5 9880.0 9856.5 9858.5 9847.5 9850.0 9843.0 9849.5 9837.0 9840.5 9833.0 9837.5 9828.5 9834.5 9821.0 9823.5 9815.0 9817.5 100.0 102.5 106.0 $ REMARKS: THIS FILE CONTAINS CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #3 GRCH TO PASS #1GRCH; AND PASS #3 NPHI TO PASS #1NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 15 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 * * SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 572381 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 572381 O0 000 O0 0 3 1 1 4 68 0000000000 N-RAT CNTD 572381 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 572381 O0 000 O0 0 3 1 1 4 68 0000000000 NCNTCNTD CPS 572381 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTD CPS 572381 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 572381 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 572381 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 572381 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 572381 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 572381 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10795.500 NPHI.CNTD 23.033 NRAT. CNTD 4.400 CRAT. CNTD NCNT. CNTD 4693.334 FCNT. CNTD 1066.667 CFTC. CNTD 931.358 CNTC. CNTD GRCH. CNTD -999.250 TENS.CNTD 1494.000 CCL. CNTD 0.000 DEPT. 9814.500 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 30.600 TENS. CNTD -999.250 CCL.CNTD -999.250 4.160 4208. 710 -999.250 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 16 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE ' 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE . : FILE HEADER FILE~ER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCREM: 0.5000 FILE SUffmlARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10827.0 9800.0 CNTD 10839.0 9800.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH GRCH C~FfD 88888.0 88883.0 88882.0 10827.5 10821.5 10817.0 10812.0 10788.0 10784.5 10772.0 10769.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 17 10761.0 10756.0 10755.5 10750.0 10751.5 10748.0 10745.0 10742.0 10743.0 10735.5 10739.5 10736.5 10734.0 10727.5 10725.0 10719.0 10720.5 10717.0 10719.5 10716.0 10702.5 10700.5 10696.0 10695.0 10693.0 10692.5 10678.0 10677.5 10674.5 10674.5 10666.0 10665.5 10664.5 10665.0 10657.0 10656.0 10652.0 10650.5 10648.5 10646.5 10632.0 10629.5 10624.0 10624.5 10607.0 10605.0 10603.0 10603.0 10596.5 10594.0 10579.5 10578.5 10567.0 10566.0 10562.0 10562.5 10550.5 10550.5 10543.5 10544.0 10525.5 10525.0 10519.0 10519.5 10518.5 10519.5 10494.5 10496.0 10493.5 10495.5 10481.0 10483.5 10480.0 10480.0 10475.0 10476.0 10471.0 10471.5 10450.0 10451.0 10447.0 10449.0 10437.0 10439.0 10435.5 10438.0 10418.5 10421.5 10410.0 10411.5 10396.5 10399.0 10371.5 10373.5 10338.0 10345.0 10337.5 10339.5 10319.5 10321.5 10313.0 10318.5 10309.0 10312.0 10297.5 10301.5 10294.5 10299.5 10285.0 10289.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 18 10272.5 10272.0 10262.5 10254.5 10247.0 10242.0 10238.0 10232.5 10221.0 10202.5 10192.5 10180.0 10172.0 10171.0 10159.0 10158.5 10148.0 10147.0 10144.5 10138.5 10129.0 10127.5 10122.5 10120.0 10103 0 10101 0 10098 5 10088 0 10087 5 10084 5 10080 5 10077.5 10077.0 10069.5 10064.0 10057.5 10053.0 10052.0 10047.5 10046.5 10037.5 10033.5 10031.0 10024.5 10023.5 10022.5 10018.5 10018.0 10015.5 10011.5 10009.5 10005.5 10005.0 10003.5 9996.5 10277.0 10267.0 10258.5 10250.5 10241.5 10224.5 10196.0 10175.0 10162.0 10151.0 10141.5 10131.5 10122.5 10104.0 10101.0 10090.0 10087.0 10082.5 10079.5 10066.0 10060.0 10055.5 10054.0 10049.0 10039.5 10035.5 10027.0 10025.0 10021.0 10014.0 10007.5 10275.5 10245.5 10236.5 10207.0 10184.0 10175.0 10162.5 10151.0 10148.5 10142.5 10132.0 10125.5 10106.5 10090.5 10080.0 10073.0 10050.0 10034.5 10025.5 10021.0 10017.5 10012.5 10008.0 10006.5 10000.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 19 9994.0 9996.5 9973.0 9973.5 9962.0 9962.5 9946.0 9948.0 9938.0 9940.0 9934.5 9938.0 9930.5 9932.5 9933.0 9928~0 9929.0 9924.0 9926.5 9923.0 9923.5 9912.5 9914.5 9894.5 9897.0 9894.0 9896.5 9890.0 9892.0 9881.0 9883.0 9879.0 9881.5 9877.5 9880.0 9875.0 9878.0 9874.5 9877.5 9864.5 9867.0 9855.0 9858.5 9847.5 9850.0 9846.5 9851.0 9844.0 9849.5 9841.5 9843.0 9834.5 9837.5 9832.0 9834.5 9826.0 9832.5 9816.5 9822.0 9815.0 9817.5 100.0 102.5 105.5 $ REMARKS: THIS FILE CONTAINS CNTD PASS #4. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #4 GRCH TO PASS #1GRCH; AND PASS #4 NPHI TO PASS #1NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 20 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 572381 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNTD PU-S 572381 O0 000 O0 0 4 1 1 4 68 0000000000 ArRAT CNTD 572381 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNTD 572381 O0 000 O0 0 4 1 1 4 68 0000000000 NCNTCNTD CPS 572381 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNTD CPS 572381 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNTD CPS 572381 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNTD CPS 572381 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 572381 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 572381 O0 000 O0 0 4 1 1 4 68 0000000000 CCL CNTD V 572381 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10833.000 NPHI.CNTD 18.822 NRAT. CNTD 3.821 CRAT. CNTD NCNT. CNTD 4954.315 FCNT. CNTD 1296.463 CFTC. CNTD 1132.004 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1437.000 CCL.CNTD 0.000 DEPT. 9802.500 NPHI.CNTD -999.250 lV-RAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 33.111 TENS. CNTD -999.250 CCL.CNTD -999.250 3.594 4496.645 -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 21 **** FILE TRAILER **** FILE NAFiE : EDIT .004 SERVICE · FLIC VERSION · O01CO1 DATE . 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE FILE HEADER FILE ~ER: AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT O. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, 4, CNTD THE ARITHMETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE APPLIED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 22 TYPE REPR CODE VALUE 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 572381 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI CNAV PU-S 572381 O0 000 O0 0 5 1 1 4 68 0000000000 NRAT CNAV 572381 O0 000 O0 0 5 1 1 4 68 0000000000 CRAT CNAV 572381 O0 000 O0 0 5 1 1 4 68 0000000000 NCNT CNAV CPS 572381 O0 000 O0 0 5 1 1 4 68 0000000000 FCNTCNAV CPS 572381 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC CNAV CPS 572381 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC CNAV CPS 572381 O0 000 O0 0 5 1 1 4 68 0000000000 GRCH CNTD GAPI 572381 O0 000 O0 0 5 1 1 4 68 0000000000 TENS CNTD LB 572381 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10829.000 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV GRCH. CNTD -999.250 TENS. CNTD 1525.000 DEPT. 9812.500 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV GRCH. CNTD 33.003 TENS.CNTD -999.250 -999.250 -999.250 -999.250 -999.250 ** ~ND OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 23 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 6 RAW CURVES Curves a~d log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VE1VDOR TOOL CODE START DEPTH STOP DEPTH 10915.5 9802.5 CNTD LOG H~ER DATA DATE LOGGED: 27-MAY-97 SOFTWARE VERSION: 8C0 - 609 TI~IE LOGGER ON BOTTOM: 1945 27-MAY-97 TD DRILLER (FT) : 11645.0 TD LOGGER (FT): 10842.0 TOP LOG INTERVAL (FT): 9800.0 BOTTOM LOG INTERVAL (FT) : 10842.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CCL CALIPER CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): TOOL NUMBER 6.000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 24 DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 10950.0 BOREHOLE CONDITIONS FLUID TYPE '. FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEA WATER 8.50 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (PT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 Iv-EAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): RE~NL~KS: DEPTH CORRELATED TO 25-DEC-1995 PDS JEWLERY LOG DEVIATION AT LOGGING INTERVAL APPROX 77 DEG. 100 BBLS OF SEA WATER USED TO PACK FORMATION FOR PASS #1.. .250 BBLS SEA WATER USED FOR R~AINING 3 PASSES. CALS FROM SHOP DATED 22-MAY-97: CNTC=8212.24 CFTC=1832.45, RATIO=4. 482 GR SPIKES NEAR THE BOTTOM OF LOGS DUE TO HEATING OF FORMATION ON BOTTOM DURING PREVIOUS RUNS. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 25 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 6 1 1 4 68 0000000000 DEPT FT 572381 NPHI PS1 PU 572381 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS1 572381 O0 000 O0 0 6 1 1 4 68 0000000000 TNP~ PS1 572381 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS1 CPS 572381 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS1 CPS 572381 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS1 CPS 572381 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS1 CPS 572381 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS1 GAPI 572381 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS1 LB 572381 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS1 V 572381 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 10915.500 NPHI.PS1 35.371 RTNR.PS1 6.000 TNRA.PS1 RCNT. PS1 4923.077 RCFT. PS1 820.513 CNTC. PS1 4392.992 CFTC. PSi GR.PS1 0.000 TENS.PSi 967.000 CCL.PS1 0.000 DEPT. 9802.500 NPHI.PS1 41.741 RTNR.PS1 6.625 TNRA.PS1 RCNT. PS1 2414.453 RCFT. PS1 364.425 CNTC. PS1 2205.619 CFTC. PSi GR.PS1 33.436 TENS.PSi 1554.000 CCL. PS1 -999.250 5.677 716.429 6. 382 318.197 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 26 ** END OF DATA ** **** FILE TRAILER **** FILE NAIVE : EDIT .006 SERVICE : FLIC VERSION . O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE . FLIC VERSION . O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS--ER: 2 DEPTH INCREMENT: 0.5000 FILE SO?~/zARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10900.0 9788.0 CNTD LOG HEADER DATA DATE LOGGED: 27-MAY-97 SOFTWARE VERSION: 8C0 - 609 TIME LOGGER ON BOTTOM: 1945 27-MAY-97 TD DRILLER (FT) : 11645.0 TD LOGGER (FT) : 10842.0 TOP LOG INTERVAL (FT): 9800.0 BOTTOM LOG INTERVAL (FT) : 10842.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO) : NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 27 CCL CALIPER CNTD COMP. NEUTRON $ CAL-U CNT -D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6. 000 10950.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEA WATER 8.50 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: DEPTH CORRELATED TO 25-DEC-1995 PDS JEWLERY LOG DEVIATION AT LOGGING INTERVAL APPROX 77 DEG. 100 BBLS OF SEA WATER USED TO PACK FORMATION FOR PASS #1...250 BBLS SEA WATER USED FOR REMAINING 3 PASSES. CALS FROM SHOP DATED 22-MAY-97:CNTC=8212.24 CFTC=1832.45, RATIO=4. 482 GR SPIKES NEAR THE BOTTOM OF LOGS DUE TO HEATING OF FORMATION ON BOTTOM DURING PREVIOUS RUNS. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PA GE: 28 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAFiE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 572381 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS2 PU 572381 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS2 572381 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS2 572381 O0 000 O0 0 7 1 1 4 68 0000000000 RCNTPS2 CPS 572381 O0 000 O0 0 7 1 . 1 4 68 0000000000 RCFT PS2 CPS 572381 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS2 CPS 572381 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS2 CPS 572381 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS2 GAPI 572381 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS2 LB 572381 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS2 V 572381 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 10900.000 NPHI.PS2 13.247 RTNR.PS2 3.000 TNRA.PS2 RCNT. PS2 5052.632 RCFT. PS2 1684.211 CNTC. PS2 4508.598 CFTC. PS2 GR.PS2 0.000 TENS.PS2 740.000 CCL.PS2 0.000 DEPT. 9788.000 NPHI.PS2 45.432 RTNR.PS2 6.893 TNRA.PS2 RCNT. PS2 2108.396 RCFT. PS2 306.057 CNTC. PS2 1852.526 CFTC. PS2 GR.PS2 36.123 TENS.PS2 1596.000 CCL.PS2 -999.250 2. 838 1470. 565 6. 801 267.223 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 29 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUM~ER 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUM~ER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10842.5 9790.5 CNTD LOG HEADER DATA DATE LOGGED: 27-MAY-97 SOFTWARE VERSION: 8C0- 609 TINZE LOGGER ON BOTTOM: 1945 27-MAY-97 TD DRILLER (FT) : 11645.0 TD LOGGER (FT) : 10842.0 TOP LOG INTERVAL (FT) : 9800.0 BOTTOM LOG INTERVAL (FT) : 10842.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE ~ 30 CCL CALIPER CNTD COMP. NEUTRON $ CAL-U CNT-D BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 6. 000 10950.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEA WATER 8.50 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: DEPTH CORRELATED TO 25-DEC-1995 PDS JEWLERY LOG DEVIATION AT LOGGING INTERVAL APPROX 77 DEG. t00 BBLS OF SEA WATER USED TO PACK FORMATION FOR PASS #1...250 BBLS SEA WATER USED FOR REMAINING 3 PASSES. CALS FROM SHOP DATED 22-MAY-97: CNTC=8212.24 CFTC=1832.45, RATIO=4. 482 GR SPIKES NEAR THE BOTTOM OF LOGS DUE TO HEATING OF FORMATION ON BOTTOM DURING PREVIOUS RUNS. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 31 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 572381 O0 000 O0 0 8 1 1 4 68 0000000000 NPHI PS3 PU 572381 O0 000 O0 0 8 1 1 4 68 0000000000 RTNR PS3 572381 O0 000 O0 0 8 1 1 4 68 0000000000 TNRA PS3 572381 O0 000 O0 0 8 1 1 4 68 0000000000 RCNTPS3 CPS 572381 O0 000 O0 0 8 1 1 4 68 0000000000 RCFT PS3 CPS 572381 O0 000 O0 0 8 1 1 4 68 0000000000 CNTC PS3 CPS 572381 O0 000 O0 0 8 1 1 4 68 0000000000 CFTC PS3 CPS 572381 O0 000 O0 0 8 1 1 4 68 0000000000 GR PS3 GAPI 572381 O0 000 O0 0 8 1 1 4 68 0000000000 TENS PS3 LB 572381 O0 000 O0 0 8 1 1 4 68 0000000000 CCL PS3 V 572381 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 10842.500 NPHI.PS3 35.371 RTNR.PS3 6.000 TNRA.PS3 RCNT. PS3 4923.077 RCFT. PS3 820.513 CNTC. PS3 4392.992 CFTC. PS3 GR.PS3 0.000 TENS.PS3 1230.000 CCL.PS3 0.000 DEPT. 9790.500 NPHI.PS3 45.335 RTNR.PS3 6.953 TNRA.PS3 RCNT. PS3 2172.709 RCFT. PS3 305.867 CNTC.PS3 1973.951 CFTC.PS3 GR.PS3 32.019 TENS.PS3 1589.000 CCL.PS3 -999.250 5.677 716.429 6.790 267.067 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 32 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE i~J~IBER 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS--ER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10893.5 9749.0 LOG HEADER DATA DATE LOGGED: 27-MAY-97 SOFTWARE VERSION: 8C0 - 609 TIME LOGGER ON BOTTOM: 1945 27-MAY-97 TD DRILLER (FT) : 11645.0 TD LOGGER (FT): 10842.0 TOP LOG INTERVAL (FT) : 9800.0 BOTTOM LOG INTERVAL (FT) : 10842.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 33 CCL CALIPER CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CAL-U CNT- D 6. 000 10950.0 SEA WATER 8.50 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): Ri~VARKS: DEPTH CORRELATED TO 25-DEC-1995 PDS JEWLERY LOG DEVIATION AT LOGGING INTERVAL APPROX 77 DEG. 100 BBLS OF SEA WATER USED TO PACK FORMATION FOR PASS #1...250 BBLS SEA WATER USED FOR REMAINING 3 PASSES. CALS FROM SHOP DATED 22-MAY-97: CNTC=8212.24 CFTC=1832.45, RATIO=4. 482 GR SPIKES NEAR THE BOTTOM OF LOGS DUE TO HEATING OF FORMATION ON BOTTOM DURING PREVIOUS RUNS. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #4. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 34 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 572381 O0 000 O0 0 9 1 1 4 68 0000000000 NPHI PS4 PU 572381 O0 000 O0 0 9 1 1 4 68 0000000000 RTNR PS4 572381 O0 000 O0 0 9 1 1 4 68 0000000000 Tlv-RA PS4 572381 O0 000 O0 0 9 1 1 4 68 0000000000 RCNTPS4 CPS 572381 O0 000 O0 0 9 1 1 4 68 0000000000 RCFT PS4 CPS 572381 O0 000 O0 0 9 1 1 4 68 0000000000 CNTC PS4 CPS 572381 O0 000 O0 0 9 1 1 4 68 0000000000 CFTC PS4 CPS 572381 O0 000 O0 0 9 1 1 4 68 0000000000 GR PS4 GAPI 572381 O0 000 O0 0 9 1 1 4 68 0000000000 TENS PS4 LB 572381 O0 000 O0 0 9 1 1 4 68 0000000000 CCL PS4 V 572381 O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 10893.500 NPHI.PS4 35.371 RTNR.PS4 6.000 TNRA.PS4 RCNT. PS4 5052.632 RCFT. PS4 842.105 CNTC. PS4 4508.598 CFTC. PS4 GR.PS4 0.000 TENS.PS4 930.000 CCL.PS4 0.000 DEPT. 9749.000 NPHI.PS4 43.376 RTNR.PS4 6.280 TNRA.PS4 RCNT. PS4 1830.334 RCFT. PS4 267.352 CNTC. PS4 1793.697 CFTC. PS4 GR.PS4 33.577 TENS.PS4 1578.000 CCL.PS4 -999.250 5.677 735.283 6.565 233.438 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-SEP-1997 12:28 PAGE: 35 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION · O01CO1 DATE : 97/09/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** TAPE TRAILER **** SERVICE NAME : EDIT DATE · 97/09/ 3 ORIGIN . FLIC TAPE NAME · 97345 CONTINUATION # : 1 PREVIOUS TAPE COBff~-a~f : BP EXPLORATION, PRUDHOE BAY, E-15A, API #50-029-20668-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE · 97/09/ 3 ORIGIN : FLIC REEL NAME : 97345 CONTINUATION # : PREVIOUS REEL : CO~ff~_2~T : BP EXPLORATION, PRUDHOE BAY, E-15A, API #50-029-20668-01