Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout195-052 RECEIVED
• STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION SEP 1 3 2012
WELL COMPLETION OR RECOMPLETION REPOOPPANDLOGns, Commissii•Ir,
la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1 b. Well CIa4$ Choragp
20AAC 25.105 20AAC 25110 IN Development u Exploratory
❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic
2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number:
BP Exploration (Alaska) Inc. 1/23/2012 195 - 052
3. Address: 6. Date Spudded: 13. API Number:
P.O. Box 196612, Anchorage, Alaska 99519 - 6612 10/01/1987 50 029 - 21755 - 01 - 00
4a. Location of Well (Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number:
Surface: 10/18/1987 PBU 18 -15A
813' FNL, 311' FWL, Sec. 19, T11 N, R15E, UM
8. KB (ft above MSL): 48 2 15. Field / Pool(s):
Top of Productive Horizon:
1523' FNL, 2673' FWL, Sec. 19, T11 N, R15E, UM GL (ft above MSL): Prudhoe Bay / Prudhoe Bay
Total Depth: 9. Plug Back Depth (MD +TVD):
2284' FNL, 2978' FWL, Sec. 19, T11 N, R15E, UM 9024' 8480'
4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation:
Surface: x - 692133 y - 5960832 Zone ASP4 10110' 8741' ADL 028321
TPI: x- 694447 y- 5960414 Zone- ASP4 11. SSSV Depth (MD +TVD): 17. Land Use Permit:
Total Depth: x- 694771 y 5959661 Zone- ASP4 None
18. Directional Surve 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD):
y ❑Y es ®No A
(Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.)
)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re -Drill /Lateral Top Window MD/TVD:
CHT, Temp, GR, CN, AC 8175' 7808'
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
CASING WT. PER FT. GRADE TOP BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED
20" 91.5# H -40 Surface 110' Surface 110' 30" 1680 # Poleset
13 -3/8" 72# L -80 Surface 2686' Surface 2686' 17 -1/2" 2500 sx CS I11, 550 sx CS II
9 -5/8" 47# L -80 Surface 8175' Surface 7808' 12 -1/4" 500 sx Class 'G'
7" 29# L -80 8021' 9547' 7692' 8721' 8-1/2" 625 sx Class 'G'
4 -1/2" 12.6# L -80 9384' 10110' 8695' 8741' 6" Uncemented Slotted Liner
24. Open to production or injection? ❑ Yes ® No 25. TUBING RECORD
If Yes, list each interval open
(MD +TVD of Top & Bottom; Perforation Size and Number): S IZE DEPTH SET (MD) PACKER SET ( MD / TVD)
4 -1/2 ", 12.6 #, 13Cr80 / L -80 8596' 8376' / 7963'
MD TVD MD TVD 8536' / 8090'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
9060' Set Posiset Plug
„4* :T, NI i_', `! - '" ii l! 9043' 8 Gal Cement
9024' Set Whipstock
27. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test: Hours Tested: Production For OIL -BBL: GAS -MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO:
Test Period 9
Flow Tubing Casing Press: Calculated OIL-BBL: GAS -MCF: WATER -BBL: OIL GRAVITY -API (CORR):
Press. 24 -Hour Rate 4
28. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes ® No
If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
None
R8DMS SEP142012/ . � '
Form 10-407 Revised 12/2009 CONTINUED ON REVERSE �,,/_ 7; f? „ / i Sub (� it Original Onlyi*
4� j /
29. GEOLOGIC MARKERS ( List all formations an rkers encountered): 30. FORMATION TESTS
NAME TVD Well Tested ?. Yes : No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
Permafrost Base results. Attach separate sheets to this form, if needed, and submit
detailed test information per 20 AAC 25.071.
Sag River 8644' 8176' None
Shublik 8696' 8216'
Sadlerochit 8776' 8280'
S 3
•
I1. Iv
Formation at Total Depth (Name):
31. List of Attachments: Summary of Pre -Rig Work, Summary of Daily Drilling Reports, Well Schematic Diagram
32. I hereby certify that the f is tr r ect to the best of my knowledge.
Signed: Joe Lastufka Title: Drilling Technologist Date: gip./ I z-
PBU 18 - 15A 195 - 052 Prepared By Name/Number Joe Lastufka, 564 - 4091
Well Number Permit No. / Approval No. Drilling Engineer: Zach Sayers, 564 -5790
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10 -407 well completion report and 10-404 well sundry report when the downhole well design is changed.
Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00).
Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut - In, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10 -407 Revised 12/2009 Submit Original Only
• •
18 -15A, Well History (Pre Rig Sidetrack)
Date Summary
12/10/11 WELL SHUT IN ON ARRIVAL. INITIAL T /I /O = 0/240/0 PSI. SET 2.13" POSISET PLUG AT 9060' MID -
ELEMENT DEPTH REFERENCED TO SLB RST LOG DATED 4- NOV -99 AS PER THE PROGRAM.
SLACKED OFF TO CONFIRM SET. RAN OUT OF TIME TO RUN CEMENT DUMP BAILERS DUE TO
16HR RULE, LAY DOWN FOR NIGHT AND RETURN IN MORNING TO DUMP CEMENT. INFORMED
DSO OF SITUATION, SECURED LOCATION FOR NIGHT, RETURN IN MORNING.
12/11/11 DUMPED TWO BAILERS CONTAINING 8 GALLONS OF CEMENT TOTAL ON TOP OF PLUG AT 9060'.
TAGGED PLUG LIGHTLY ON FIRST DUMP TO CONFIRM PLUG STILL THERE. DEPTH CORRECTED
TO SLB RST LOG DATED 4- NOV -99. FINAL T /I /O 0/240/0. LEFT WELL SHUT -IN AND HUNG TAG ON
WING TO NOT FLOW UNTIL CEMENT IS CURED. HAND OVER WITH DSO PRIOR TO DEPARTURE.
JOB COMPLETE.
12/14/11 WELL S/I ON ARRIVAL. RIG UP TO DRIFT TO 9,060' ELM W/ 3.70" x 20' DUMMY WHIPSTOCK.
12/15/11 TAGGED TOC @ 9,043' SLM W/ 3.70" x 20' DUMMY WHIPSTOCK (No issues). WELL S/I ON
DEPARTURE, NOTIFIED DSO OF WELL STATUS.
12/16/11 T/I/O= 0/100/0. MIT -T PASSED to 1000 psi. (CTD Prep) Pumped 5 bbls neat methanol, followed by 4.75
bbls dsl down Tbg to reach test pressure for MIT -T. Tbg lost 7 psi in the 1st 15 min and 3 psi in the 2nd
15 min for a total pressure loss of 10 psi in 30 mins. Bled Tbg to 0 psi (2 bbls). DSO notified of well
status. FWHP= 0/120/0.
12/18/11 WELL SHUT -IN ON ARRIVAL. INITIAL T /I /O 0/240/0 ATTEMPTED TO RUN A WHIPSTOCK, ABLE
TO RIG UP BUT HAD TO CANCEL OPERATIONS DUE TO TWO TRIPLEX FAILURES INHIBITING
ABILITY TO GET A PRESSURE TEST. LAID UNIT DOWN FOR NIGHT, LEAVE SPOTTED, RETURN IN
MORNING TO ATTEMPT AGAIN. DSO NOTIFIED WELL SECURE.
12/19/11 WELL SHUT -IN ON ARRIVAL. INITIAL T /I /O 0/240/0 RAN BAKER 4.5" x 7" THRU TUBING
WHIPSTOCK TO 9020' DEPTH CORRECTED TO SLB RST LOG DATED 4- NOV -99. WS HAS TWO
PIP TAGS INSTALLED BY BAKER. WS SERIAL # H150 -50 -7010. SET TOP OF WS AT 9020' AS PER
PROGRAM. ORIENTATION OF WS IS 144.4° LEFT OF HIGH SIDE. SLACKED OFF TO CONFIRM
SET. POOH. LEFT WELL SHUT -IN, HAND OVER WITH DSO PRIOR TO DEPARTURE. FINAL T /I /O
0/240/0. JOB COMPLETE.
01/11/12 T /I /O= SSV /240Nac. Temp= SI. Bleed WHPs to 0 psi (Pre CTD). No AL. IA FL @ surface. Flow line and
well house have been removed. Unable to determine TP due to SSV being inoperable. Bled IAP from
240 psi to 2 psi in 2.5 hrs. (20 gals fluid /gas). Monitored for 30 mins. IAP increased to 10 psi. Job
complete.
01/14/12 T /I /O = SSV /75NAC. Temp = SI. Bleed IAP to —0 psi (pre CTD). No AL. Flowline and wellhouse
removed. Integral installed on IA. Bled IAP to 0+ in 15 min all gas. Monitored for 15 min. IAP increased
10 psi. Job complete. Final WHPs = SSV /10NAC.
01/15/12 T /I /0= 40 /60Nac. Temp= SI. WHPs (Pre CTD). No AL. Flowline and well house have been removed.
Integral installed on IA. IA increased 50 psi over night. LOTO on master valve has been removed.
01/15/12 T /I /O= 200/0/0 TEMP= SI RG 2401 (SURFACE CASING CORR MITIGATION) PJSM. SET UP HYDRO
VAC AND JOB SITE. START AND COMPLETE EXCAVATION ON WELL CELLAR. RDMO. VOID= 18 ".
DUST COVER.
T /I /O= 200/0/0 TEMP= SI RG 2401 (SURFACE CASING CORR MITIGATION) PJSM. SET UP TRAILER
AND JOB SITE. STRAP CONDUCTOR @ 18 ". INSTALL SPILL CONTAINMENT. PUMP 11.05
GALLONS RG2401 TO FILL VOID. RDMO. DUST COVER.
01/16/12 T /I /0= 40 /60Nac. Temp= SI. Bleed T & IA to —0 psi (Pre CTD). Bled TP from 40 psi to 0 psi in 3 mins.
(Gas and fluid). Bled IAP from 60 psi to 0 psi in 5 mins. IAP increased to 10 psi within 15 mins. Held
open bleed on IAP for 3 hrs (All gas). Monitored for 30 mins. TP increased to 2 psi and IAP increased to
12 psi. FWHPs = 2 /12Nac.
Page 1 of 2
• •
18 -15A, Well History (Pre Rig Sidetrack)
Date Summary
01/19/12 T /I /0= 7 /68Nac. Temp= SI. Bleed T & IA to -0 psi (CTD prep). No AL, flowline, or wellhouse. Bled TP
from 7 psi to 0+ psi in 20 mins (gas). Bled IAP from 68 psi to 0 psi in 1 hr. Monitored for 30 mins. TP
increased 1 psi & IAP increased 13 psi. Job complete. Final WHPs= 1 /13Nac.
Page 2 of 2
• •
North America - ALASKA - BP Pag 1..
Operation Summary Report
Common Well Name: 18 -15 AFE No
Event Type: RE- ENTER- ONSHORE (RON) Start Date: 1/20/2012 End Date: X3- 0116N -C: (2,268,182.00 )
Project: Prudhoe Bay Site: PB DS 18
- Rig Name /No.: NORDIC 2 Spud Date/Time: 10/1/1987 12:00:OOAM Rig Release:
Rig Contractor: NORDIC CALISTA UWI: 500292175500
Active Datum: ORIG KELLY BUSHING 048.00ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
hr ft
1/20/2012 12:00 - 18:00 6.00 MOB N WAIT PRE CONTINUE TO STANDBY ON W -PAD.
CONTINUE TO MOVE EQUIPMENT TO DS 18.
WAITING ON SECURITY TO COMPLETE KENAI
CAMP MOVE TO KUPARUK.
18:00 - 20:30 2.50 MOB N WAIT • • CREW CHNAGE, CHECK RIG EQUIPMENT.
CONTINUE TO WAIT ON SECURITY FOR RIG
MOVE.
TOUR PUSHER AND DRILLER DROVE ROUTE
TO W -PAD-
TO INSPECT ROAD CONDITIONS FOR RIG
TRAVEL.
20:30 - 21:00 0.50 MOB •' PJSM FOR RIG MOVE WITH SECURITY, DRILL
CREW, NORDIC FIELD SUPERINTENDANT,
WSL, TOUR PUSHER, SLB. REVIEW SOP AND
ROUE INSPECTION.
21:00 - 00:00 3.00 MOB irral MOVE RIG FROM W -PAD TO DS18.
1/21/2012 00:00 - 05:30 5.50 MOB MI MOVE RIG TO DS18.
05:30 - 07:30 2.00 MOB CREW CHANGE. RIG STOPPED AT PRICE
PAD TO ALLOW FIELD CHANGEOUT.
DISCUSS RIG STATUS.
07:30 - 12:00 4.50 MOB ' - CONTINUE TO MOVE RIG TO DS 18.
RIG AT CENTRAL POWER STATION,
12:00 - 16:00 4.00 MOB II I CONTINUE RIG MOVE TO DS 18,
ARRIVE AT DS18 AT 1600 HRS.
COMPLETE WELL TRANSFER PERMIT WITH
DSO.
16:00 - 20:30 4.50 MOB PJSM FOR BACKING RIG OVER WELL WITH -
WSL, NORDIC FS, TP, DSO AND CREWS.
SET RIG MATS IN PLACE.
ALIGN RIG AND BACK OVER DS18 -15C.
SET RIG DOWN,
RIG ACCEPTED AT 20:30
20:30 - 22:00 1.50 RIGU -- BERM IN CELLAR, SPOT SATTELITE CAMP,
SET LANDINGS AND WALKWAYS.
R/U TRANSDUCES TO IA AND OA.
R/U VALVE GUARDS ON THE SAME. SPOT
RIG EQUIPMENT AS IT SHOWS
UP FROM W -PAD. HARDLINE CREW ON
LOCATION - R/U FLOWBACK TANK AND
HARDLINE.
__. R/U SATTELITE POWER.
22:00 - 22:45 0.75 BOPSUR PJSM, N/D TREE CAP, N/U BOPE.
22:45 - 00:00 1.25 BOPSUR • PRE PJSM WITH CH2MHILL.
LIFT HOUSE.
CONTINUE NU BOPE.
1/22/2012 00:00 - 01:15 1.25 BOPSUR PRE CONTINUE REEL NN BOPE. REEL
01:15 - 04:15 3,00 RIGU P PRE RJSM, R/U REEL HARDLINE AND BULKHEAD.
HARDLINE CREW CONTINUES TO SPOT
FLOWBACKTANKAND R/U HARDLINE.
PT HARDLINE.
R/U SUPPORT EQUIPMENT.
Printed 1/30/2012 1:57:11PM
• •
. North America - ALASKA - BP gage 2 a
Operation Summary Report
Common Well Name: 18 -15 AFE No
Event Type: RE- ENTER- ONSHORE (RON) + Start Date: 1/20/2012 End Date: X3- 0116N -C: (2,268,182.00 )
Project: Prudhoe Bay Site: PB DS 18
Rig Name/No,: NORDIC 2 Spud DatetTiime: 10/1/1987 12:00:00AM Rig Release:
Rig Contractor: NORDIC CALISTA s UWI: 500292175500
Active Datum: ORIG KELLY BUSHING € 48.00ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
hr) ft
'04:15 - 04:40 0.42 RIGU PRE CONDUCT MS RIG EVACUATION DRILL.
MUSTER IN PRIMARY SAFE AREA AT
SATTELITE OFFICE.
NOTIFY DSO OF DRILL.
EVERYONE ACCOUNTED FOR- CONDUCT
AAR.
GOOD JOB BY ALL, FLOORHAND SHOWED
UP WITH SCBA-
SCS NOTIFYED VAC TRUCK DRIVERS TO
REMAIN AT SIGN IN SHACK.
EVAC SIREN HEARD BY EVERYONE.
04:40 - 06:00 1.33 RIGU PRE FILL PITS WITH 8.6 PPG RECONDITIONED
DRILLING MUD.
580 BBLS MUD DELIVERED.
PJSM, PREP COIL TO PULL ACCROSS.
06 :00 - 06:30 0.50 RIGU i PRE CREW CHANGE. DISCUSS CURRENT OPS
AND RIG STATUS. MAKE EQUIPMENT
CHECKS AND OUTSIDE ROUNDS.
CONTINUE TO PREP TO PULL COIL ACROSS.
06:30 - 09:30 3.00 RIGU ill PRE PULL AND STAB COIL.
09:30 - 11:30 2.00 RIGU I PRE MU E -COIL HEAD, TEST SAME (PT, PRESS,
COND
11:30 - 13:30 2.00 RIGU CIRCULATE COIL. PUMP 10 BBLS MEOH,15
BBLS FRESH WATER. CHASE WITH DRILLING
_, _ ..._. MUD.
13:30 - 18:00 4.50 BOPSUR SHELL TEST BOPS.
BEGIN COMPLETE BOP TEST PROCEDURE.
TEST ALL EQUIPMENT AS PER AOGCC REGS,
PERMIT TO DRILL, AND BP GUIDELINES,
CHART RECORD TESTS.
TEST WITNESS WAIVED BY JOHN CRISP,
AOGCC INSPECTOR.
PERFORM ACCUMULATOR DRAWDOWN
TEST.
18:00 - 18:30 0.50 BOPSUR PRE CREW CHANGE, DISCUSS CURRENT RIG
OPS.
CHECK EQUIPMENT.
18:30 - 19:20 0.83 BOPSUR PRE PUMP SLACK FORWARD 3.8 BPM 3300 PSI.
19:20 - 20:20 1,00 BOPSUR PRE PRESSURE TEST INNER REEL VALVE,
PACKOFF AND BULKHEAD-
TO 250/3500 PSI 5 MIN EACH. CHART
RECORD TEST.
20:20 - 22:00 1.67 BOPSUR PRE PJSM, DISCUSS POTENTIAL FOR COIL
FREEZE UP. -35 DEG.
BLOW DOWN KILL LINE. CIRULATE COIL.
INSTALL AND TEST DFCV-
TO 250/3500 PSI. CHART TEST,
Printed 1/30/2012 1:57:11PM
• •
North America - ALASKA - BP Page 38F='
Operation Summary Report
Common Well Name: 18 -15 AFE No
Event Type: RE- ENTER- ONSHORE (RON) Start Date: 1/20/2012 End Date: X3- 0116N -C: (2,268,182.00 )
Project: Prudhoe Bay Site -PB DS 18
Rig Name /No.: NORDIC 2 Spud Date/Time: 10/1/1987 12:00 :OOAM Rig Release:
Rig Contractor: NORDIC CALISTA UWI: 500292175500
Active Datum: ORIG KELLY BUSHING @48.00ft (above Mean Sea Level)
Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations
22:00 - 22:30 0.50 BOPSUR P (ft) PRE H2S RIG EVACUATION DRILL- CONDUCT AAR.
WHAT WENT RIGHT- ALL HANDS
ACCOUNTED FOR.
RESONDED IN A TIMLEY MANNER TO
MUSTER AREA.
WIND DIRECTION WAS IDENTIFIED, SCS
NOTIFIED NON RIG PERSONEL.
WHAT WENT WRONG- DOGHOUSE RIG EVAC
ALARM FAILED TO WORK
IN -36 DEG WEATHER, ALTERNATE ALARMS
WERE SOUNDED AND A GIATRONICS
ANNOUNCMENT WAS MADE. DSO HARMONY
NUMBER WAS DIFFERENT DUE TO NEW
RELEIF ON SLOPE.
LESSONS LEARNED- ALWAYS BE PREPARED
FOR THE UNEXPECTED -
EVEN THOUGH 1 ALARM DIDN'T SOUND
THERE ARE ALTERNATE ALARMS TO USE.
HARMONY NUMBERS FOR DSO HAVE
CHANGE DUE TO THERE CREW CHANGE -
THEY WERE STILL ABLE TO BE NOTIFIED.
SCS TO VERIFY DSO HARMONY NUMBERS.
22:30 - 23:40 1.17 BOPSUR P PRE PJSM FOR PULLING TWC VALVE WITH VALVE
CREW, WSL DRILL CREW AND TP.
REVIEW SOP FOR PULLING TWC. LOAD
LUBRICATOR ONTO RIG.
R/U LUBRICATOR AND TOOLS. CLOSE SSV,
OPEN SWAB. STAB LUBRICATOR.
23:40 - 00:00 0.33 BOPSUR P PRE PRESSURE TEST LUBRICATOR AGAINST
CLOSED SSV AND MASTER VALVE
TO 250/3500 PSI. CHART RECORD TESTS.
OPEN SSV AND MASTER VALVE.
1/23/2012 00:00 - 00:30 0.50 BOPSUR P PRE PULL TWC VALVE. NO WHP OBSERVED.
CLOSE MASTER AND SSV.
00:30 - 00:50 0.33 BOPSUR P PRE PRESSURE TEST AGAINST CLOSED
BARRIERS TO
250/3500 PSI. CHART TEST.
00:50 - 01:15 0.42 BOPSUR P PRE UD TOOLS AND LUBRICATOR.
01:15 - 01:30 0.25 BOPSUR P PRE INSTALL LUBRICATOR CAP. CLOSE SWAB
VALVE.
OPEN SSV. INSTALL FUSABLE CAP.
LOAD OUT TOOLS.
01:30 - 02:00 0.50 BOPSUR P PRE SHUT IN CHOKE, PRESSURE TEST
LUBRICATOR CAP TO 250/3500 PSI.
CHART TEST. OPEN MASTER AND SWAB
VALVES.
NO WHP. OPEN MANUAL CHOKE.
02:00 - 02:40 0.67 BOPSUR P PRE FLOWCHECK WELL FOR 30 MIN. STATIC_
PJSM FOR P/U WINDOW MILL BHA.
02:40 - 03:15 0.58 BOPSUR N SFAL WEXIT PREP TO P/U WINDOW MILL BHA.
R/U AIR TO CHECK FLOWBACK LINE
FLOWBACK LINE FROZEN. -45 AMBIENT
TEMP
FROZE BELOW FLOOR- ICE PLUG.
FLUID PACK WITH METHONAL.
03:15 - 04:00 0.75 STWHIP P WEXIT .M/U WINDOW MILL BHA# 1.
3.80" DSM, 3.79" STRING MILL, 2 7/8" XTREME
MOTOR, XO, 2 JTS 2 3/8" PH6,
XO, XO, BS, DGS, DPS, EDC, PC, SWP, LQC,
UQC, XO, CTC.
M/U INJECTOR. TEST QTS.
Printed 1/30/2012 1:57:11PM
• •
North America - ALASKA - BP Page 4 oS
Operation Summary Report
Common Well Name: 18 -15 AFE No
Event Type: RE- ENTER- ONSHORE (RON) Start Date: 1/20/2012 End Date: X3- 0116N -C: (2,268,182.00 )
Project: Prudhoe Bay Site: PB DS 18
Rig Name/No.: NORDIC 2 Spud Date/Time: 10/111987 12:00:OOAM Rig Release:
Rig Contractor: NORDIC CALISTA UWI: 500292175500
Active Datum: ORIG KELLY BUSHING @48,00ft (above Mean Sea Level)
Date From - To Hrs Task Code I NPT NPT Depth Phase Description of Operations
hr ft
04:00 - 06:00 2.00 STWHIP P WEXIT RIH PUMPING MIN RATE,
TAKE DIESEL RETURNS TO TIGER TANK.
STRAP RETURNS IN TIGER TANK EVERY
_ 1000'
06:00 - 06:30 0.50 STWHIP P WEXIT CREW CHANGE, DISCUSS..CURRENT
OPERATION ...MAKE.EQUIPMENT.CHECKS.INS
IDE.AND..OUTSIDE..RIG.
CONTINUE TO RIH.
06 :30 - 08:30 2.00 STWHIP P WEXIT RUN IN HOLE TO 9039'
DISPLACE WELL TO USED DRILLING MUD
(POWER VIS)
2552 PSI AT 2.49 BPM IN,
08:30 - 09:30 1.00 STWHIP P WEXIT LOG GR TIE INTO PDC LOG. SUBTRACT 13'
CORRECTION.
09:30 - 10:30 1.00 STWHIP P WEXIT GET SLOW CIRC RATE FOR PUMPS.
RIH AND TAG WHIPSTOCK AT 9024.4'
41 K# UP, 21K# DN. 2960 PSI FS AT 2.60 BPM
IN.
t 10:30 - 14:00 3.50 STWHIP P WEXIT MILL WINDOW FROM 9023.7'
2960 PSI FS AT 2.6 BPM IN/OUT.
l $3 TIME MILL AT 1' PER HOUR.
MTR WORK SLOWLY INCREASING. MILL AT
3150 -3200 PSI AT 2.60 BPM.
MILL TO 9026.4'
14:00 - 18:00 4.00 STWHIP P WEXIT MILL AHEAD TO 9030'.
3050 PSI FS AT 2.58 BPM IN/OUT. 150 -300 PSI
MTR WORK.
2.5 -3.5K# DHWOB.
18:00 - 18:30 0.50 STWHIP P WEXIT CREW CHANGE, DISCUSS CURRENT OPS.
CHECK EQUIPMENT.
18:30 - 20:10 1.67 STWHIP P WEXIT CONTINUE MILLING WINDOW.
MILL AHEAD FROM 9031.2'. DHWOB= 2 -2.5K.
F /S= 2.6 BPM 2960 PSI WITH 340 PSI MOTOR
WORK.
IN/OUT= 2.6 BPM. PVT= 407 BBLS. I/A= 288
PSI. O /A= 338 PSI,
MILL EXIT WINDOW AT 9032'
FORMATION RETURNS NOTED AT SHAKER.
20:10 - 00:00 3.83 STWHIP P WEXIT CONTINUE MILLING 10' OF RATHOLE TO 9041'
1/24/2012 00:00 - 00:30 0.50 STWHIP P WEXIT MILL RATHOLE TO 9042'
PUMPING 2.6 BPM 3420 PSI. DHWOB= 3.9K.
ROP= 1.5 FPH. IN/OUT= 2.6 BPM. PVT= 403
BBLS.
00:30 - 01:30 1.00 STWHIP P WEXIT REAM- CLEANUP WINDOW MAKING 3
PASSES.
DRY DRIFT WINDOW- CLEAN.
TOW AT 9023.7' BOW AT 9031'.
01:30 - 01:40 0.17 STWHIP P WEXIT FLOWCHECKWELL. STATIC.
PJSM FOR POH. OPEN EDC.
01:40 - 03:15 1.58 STWHIP P WEXIT POH PUMPING 3.15 BPM 3000 PSI.
PERFORM 500' JOG AT SURFACE.
03:15 - 03:20 0.08 STWHIP P WEXIT FLOWCHECK AT SURFACE- STATIC.
OPEN EDC, PJSM FOR BHA.
PVT= 353 BBLS.
03:20 - 04:10 0.83 STWHIP P WEXIT SET BACK INJECTOR.
LJD WINDOW MILL BHA# 1
MILL= 3.79" GO, 3.78 NO GO.
STRING MILL= 3.79" GO. 3.78" NO GO.
�_ __ _, LOAD OUT TOOLS.
Printed 1/30/2012 1:57:11PM
• •
TREE= 4-1/16" COW
WELLHEAD= R IC 1 8 -15 C SAFETY 4-112" CHROME W LLANGLE> 70° 19314'
ACTUATOR = BAKER C
KB. ELEV = 48'
BF ELEV = 13 -3/8" CSG, -{ ( 78' I a.c I
KOP = 3350' 68/!, K -55 BTC,
0
2104' - {41/2 HES KM NIPPLE, ID = 3.813"
Max Angle = 93° @ 11371' 10 = 12.415"
Datum MD= 13198' : " 1 2410' 9 -518" i BKR ZXP LTP, 10 = 6.310" 1
Datum TVD = 8800' SS 1 2428' 149 -5/8" X 7" BKR FLEX -LOCK HGR, ID = 6.260" 1
!TOP OF T' SCAB LNR f-J 2410' 4' GAS LIFT MANDRELS
x ii, S T MD - 7E DEV TYPE VLV LATCH PORT DATE
1 13 -3/8" CSG, 72 #, L -80 BTC, ID = 12.347" 1-1 2687' > 4 3008 3008 4 KBG2 DMY BK 0 05/14/11
Minimum ID = 2.377" c 9364" 1 3 4752 4689 19 KBG2 DMY BK 0 05/14/11
2 6375 6213 19 KBG2 DMY BK 0 04/24/05
3- 3116" X 2-7/8" LNR PfN 1 21 7909 7605 38 KBG2 DMY BK 0 04/24/05
M
7" SCAB LNR, 26 #, L -80 STC•M, ID= 6.276" I--" 8021' " 8021' -(7' BKR C•2 TIEBACK SLV, ID = 7 50"
8028' H9 -5/8" X 7" BKR H PKR, ID= 6.188" 1
1
( 9 -518" CSG, 47 #, L -80 BTC-M, ID= 8.681" H 8175' 8034' I-19-5/8" X 7" BKR HMG HGR, ID = 6.26"
9 -5/8" CSG MILLOUT WINDOW (1B -15A) II r " 1 8355' 1-- 14 - /2" HES X NIP, ID = 3.813" 1
8175' - 8225' (50' W/ SECTION MILL)
S 25, [ 8376' 1 X 4-1/2" BKR S -3 PKR, ID= 3 875" 1
r 1 8382' J-- {3.70" DEPLOY SLV, ID= 3.00"
4-1/2" TBG, 12.6 #, 13CR -80 VAM TOP ---1 8460' , 1 8399' H4-1/2" HES X NIP, 10 = 3.813" (BEHIND LNR)
.0152 bpf, ID= 3.958" - 1 8404' 1„13 -1/2" X 3-1/4" XO, ID= 2.786 1
4 -1/2" TBG, 12.6 #, L -80 NSCT, ---f 8595' ! 8462' -1 TUBING STUB (04/17/05) BEHIND
0152 bpf, ID= 3.993" 8463` 17 "X 4 -t /2" UNIQUE OVERSHOT - 1 CT LNR 1
% X 1 8536' F{7" X 4 SKR S - 3 PKR, 0 = 3.375"
PERFORATION SUMMARY ' 1 8562' 1_„14 -112" HES XN NIP, MILLED TO 3.80" (1995) 1
REF LOG' BEHIND
ANGLE AT TOPPERF: °@' / -■ 1 8596' 1- 14 -1/2" WLEG, ID= 4.00" 1 CT LNR
Note: Refer to Production DB For historical pert data
S2E SPF INTERVAL Opn /Sqz DATE
111- 1 8742' 1--17" MARKER JOINT 1
MILLOUT WINDOW (18 -15C) 9024' - 9032'
1 7" LNR, 29 #, L -80 NSCC, ,0371 bpf, ID = 6,184" 1-L-9024
17" WHIPSTOCK ( 12/19/11) 1--1 9024'
!CEMENT CAP- 8 GAL (12/11/11) 1 9043' SLM s+ .1 9365' 3-1/4" X 2 -718" X0, ID= 2.377"1
12.13" POSISET PLUG (12111/11) (-1 9060'
PBTD j
(3 -1/4" LNR, 6.6 #, L -80 TCII, .0079 bpf, ID = 2.85" 1- ( 9365' 1 1 ( MIME
/I
12 -7/8" LNR, 6.4 #, L -80 STL, .0058 bpf, ID = 2.441" 1--1 11730' 1
DATE REV BY - COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT
11103187 ROW 41 ORIGINAL COMPLETION - WELL: 1B-15C
05/20/95 N2ES SIDETRACK(18 - 15A) PERMIT No: '2111720
05123197 N4 ES 'CTDSDTRACK (18 -158) API No: 50-029-21755-03
02105 /12 NORDIC 2 CTD SDTRACK (18.15C) SEC 19, 711 N, R15E, 813' FNL & 311' FWL
02/06/12 PJC DRLG HO CORRECTIONS
02/07/12 ZJS/ PJC FINAL DRLG CORRECTIONS BP Exploration (Alaska)
THE' MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON :OR BEFORE
JANUARY 03 200,1
PL
M
ATE
T
H
IS
E
W
.IA L UNDER
M A R K E R
C:LORBMFILM.DOC
Memorandum
State of Alaska
Oil and Gas Conservation Commission
To' Well File: Prudhoe Bay Unit 18-15A Permit # 95-0052
January 12, 1999
Re~
Administrative Abandonment Action
Prudhoe Bay Unit 18-15A Permit # 95-0052
This memo will remain at the front of the subject well file.
Well 18-15A was replaced by 18-15B (permit # 97-0072, APl # 50-029-21755-02) when the permit
was approved 5/5/97. The replacement well incorporates a deepening operation of the existing well
bore. This extension, along with the original hole, will be used for production of hydrocarbons. A
review of both well files indicates administrative abandonment of the originating well bore is
appropriate according to current AOGCC procedures for wells 'where additional permitted extension is
drilled from an existing well bore.
20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled
to straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC
data bases require each conductor has only one permit number and API number. Administrative
abandonment of the original permit only eliminates duplication in the databases. Information for the
original well and its replacement will be maintained in their respective files.
The operator has been notified of this action. All future correspondence with the AOGCC should
reflect the new permit number, AP1 number and well data.
Statistical Technician' 't.t~ ~l~}/)~[,~, '~eservoir Engineer ~~~ ¢//~
Petroleum Geologist~~~~//~Commissioner ~
TONY KNO WLE$, GO VERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
January 12, 1999
Mr. Bruce Smith
Arco Alaska Inc.
P O Box 100360
Anchorage, AK 99510-0360
Administrative Abandonment Action
Prudhoe Bay Unit 18-15A Permit # 95-0052
Dear Mr. Smith,
Well 18-15A was replaced by 18-15B (permit # 97-0072, API# 50-029-21755-02) when the permit was
approved 5/5/97. The replacement well incorporates a deepening with the existing well bore. The
extension, along with the original hole, will be used for production of hydrocarbons. A review of both
well files indicates administrative abandonment of the originating well bore is appropriate according to
current AOGCC procedures for wells where additional permitted extension are drilled from an existing
well bore.
20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled to
straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data
bases require each conductor has only one permit number and API number. Administrative abandonment
of the original permit only eliminates duplication in the databases. Information for the original well and
its replacement will be maintained in their respective files.
Please notify other cognizant personnel in your organization so that the well will be correctly identified
on subsequent reports and applications submitted to the Commission.
Sincerely,
Steve McMains
Statistical Technician
AOGCC
cc: Bob Wilkes
'i
95-'-052
95 .... 052
95'--052
95---052
95 ..... O52
95 .... 052
BI'~C--AC/G R
CN/,'S? FINAL.
S'S V D 'F I N A !...
J:' D K ,,, 'i 00/: G R/' C C !.,.
..... J: 8'i 77'--9539
.
,'1'-" 8"ir~:O .... ~'5i 1
......
~..,
L 8150 ....9539
-I .... °-q 00-'-.c, ~. 100a. 8
'i
i
1
F-' /iq/:,, I.
1 .... 5
'i
R Cn,, ki F' .L ..L( T Z n.. N D A T E ,1 ,/ ...~ / ,/, /;
_ -
A r' e d r' y d 'i t o h s a ia p I e s r' e q u 'i r' e d ? y e s "--.Op A ia d r" e c e 'i v e d ? y e s
Was the we'l'i cor"ed? yes ~_.? Ana'iys'is & descl'.'i'p't:'ion i"ec:(:"ived'?
(-}'}'~x_ R e c e 'i v e d ? y e s
ri 0
I"l (3
rl !::1 I I_1_ i I~ G S I=: I::t L/I 1-- 1=:: S
WELL LOG TRANSMITTAL
To: State of Alaska October 28, 1996
Alaska Oil and Gas Conservation Comm.
Attn: Howard Okland
3001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Tapes-DS 18-15A & 18-15A PB1
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.'
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
2 LDWG formatted magnetic tapes with LIS listing.
API~: 50-029-21755-01 & 50-029-21755-70 respectively.
Fq CEtVED
?':0'/ 0 4 i996
At~ka Oil & Gas Cons. Commission
Anchorage
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (9.07) 563-3256 ° Fax (907) 563-7252
A Dresser Industries, Inc, Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
vCELL COMPLETION OR RECOMP LETION REPORT .! I£ LOG
1. Status of Well Classification of Service ~/~1
OIL [] GAS [] SUSPE]~E:~ED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 95-52
3. Address 8. APl Number
P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21755-01
4. Location of well at surface ~ ............ ~ 9. Unit or Lease Name
4466'NSL, 4642'WEL, SEC. 19, T11N, R15E I ,~^TE, ~ lO. Well Number
At Top Producing Interval
3705' NSL, 2209'WEL, SEC. 19, T11N, R15E ['i ~¢¢'~_~~\IE~FI~'D ii ,~.~-"~¢~ 11.18'15AField and Pool
At Total Depth ~ ....................... ~~~~~ " P~dhoe Bay Fiel~Prudhoe Bay Pool
3073' NSL, 1971' WEL, SEC. 19, T11N, R15E
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 48' ADL 028321
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. ~15. Water Depth, if offshore 16. No. of Completions
05/11/95 05/18/95 05/20/95~ N/A feet USE One
17. Total Depth (MD+~D) 18. Plug Back Depth (MD+~D) 19. Directional Su~ey 20. Depth where SSSV set ]21. Thickness of Permafrost
10110'MD/8737' ~D 10086'MD/8735' ~D ~ ~ ~ D 2125' feet MD~ 1900' (Approx.)
22. Type Electric or ~her Logs Run
CH~ Temp, GR, CN, AC
23. CASING, UNER ~D CEME~I~
S~NG DE~ MD
CASING SIZE ~. PER ~. G~ T~ ~ ~ Sl~ C~~ ~ ~OU~ PU~D
20" 91.5~ H-40 Sudace 110' 30" 1680 ~ Poleset
13-3/8" 72~ L-80 Surface 2686' 17-1/2" 2500 sx CS III, 550 sX CS II
9-5/8" 47~ L-80 Sudace 8175' 12-1/4" 500 sx Class 'G'
7" 29~ L-80 8021' 954 7' 8-1/2" 625 sx Class 'G'
4-1/2" 12.6 L-80 9384' 10110' 6" Uncemented slo~ed liner
24. Pedorations open to Production (MD+~D of Top and BoSom and 25. ~BING RE,RD
inte~al, size and number) ~ SIZE DEP~ S~(MD~ PACKER S~ (MD~
4-1/2" 8596' MD 8536'
SIo~ed Linen
MD ~ 26. ACID, F~C~RE, CEM~ SQU~, ~C.
DEPTH I~ERVAL (MD) ~OU~ & KIND OF MATERIAL USED
9464'- 10087' 8713' - 8735' Freeze Prot. w/140 bbls Diesel
27. PRODUC~ON ~ST
,Date First Production Method of Operation (Flowing, gas li~ etc.)
June 1, 1995 Raw Gas Lift
Date of Test Hours Tested =R~U~ON FOR OIL-BBL GAS-MCF WATER-BBL C~S~ ]GAS-OIL RATIO
~ PERIOD
Flow Tubing Casing Pressure 3~CU~D OIL-BBL GAS-MCF WATER-BBL OIL GRAVIS-APl (corr)
Press. 24-HOUR ~TE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
.
. ,~chorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Sag River 8644' 8126'
Shublik 8696' 8166'
Top Sadlerochit 8776' 8231'
31. LIST OF A'i-I'ACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~
Signed .~~1~~.v Title Seni(prDrillingEngineer Date ~/~J ~///~ ~, '~
INS'I:RUCTIONS
General: This form js designed for submitting a complete and correct well completion report and Icg on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21- Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
.
.
Item 28: If no cores taken, indicate "none". ~'~. ,,'~, ' '
SEP' 9
A~s~.~ Oil & Gas Cons. commission
Anchorage
Form 10-407
_~AI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: DS 18-15A
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 05/01/95 03:00
SPUD:
RELEASE:
OPERATION:
DRLG RIG: NABORS 2ES
WO/C RIG: NABORS 2ES
05/02/95 (1)
TD: 0' ( 0)
05/03/95 (2)
TD: 0' ( 0)
05/04/95 ( 3)
TD: 8450
PB: 0
N/U BOP, PREP TO TEST MW: 0.0 VIS: 0
MOVED RIG FROM 18-24A TO 18-15A. RIG ACCEPTED @ 1500 HRS
ON 05/01/95. PULLED BPV. TESTED LINES. PUMPED 1 TBG VOL
ON ANN. AFTER 45 BBL HAD NO RETURNS. SHUT DOWN. CIRC
DOWN. SHUT IN AND MONITORED WELL. NO GAS LOSS. INSTALLED
BPV, AND KEPT HOLE FILLED ON ANNULUS. N/D TREE AND ADAPTER
FLANGE. INSPECTED HGR AND INSTALLED BLANKING PLUG. N/U
DSA AND BOP. CHANGED TOP RAMS TO 3.5 X 6" VAR. RAMS AND
PREPPED TO TEST BOPE.
POH L/D 3 1/2" TBG MW: 0.0 VIS: 0
R/U TEST EQUIPMENT AND TESTED BOP. WILL TEST LOWER RAMS
AND KELLY WHEN\POH W/.TBG. DSM ATTEMPTED TO PULL BPV. HAD
MULTIPLE PROBLEMS W/ LUBRICATOR, THEN BENT MANDREL IN
PULLING TOOL. DID NOT HAVE REPLACEMENT PARTS OF REDUNDANT
TOOL. M/U LANDING JT. CIRC DOWN TBG ONE VOL. STOPPED
PUMPING. CLOSED HYDRIL AND PULLED HGR W/ 100K UP. WELL
DEAD. L/D HGR AND BPV. WELL TAKING FLUID. KEPT FULL W/
CHARGER PUMP. POH L/D TBG. 40-5-K UPDRAG, AT TIMES
HANGING UP IN BOTH DIRECTIONS, THRU lST 48 JTS. CUT ON TBG
NOT COMPLETE. STILL HAVE COMPLETION BELOW. RECOVERED 38
SS BANDS.
POH W/ CMT STINGER MW: 0.0
POH L/D TUBING PUL'LED OUT 321 JTS TOTAL + TIW OVERSHOT.
NORM'ED UNDER ~CTIO~ STANDARD, OK TO SHIP. L/D 3 1/2"
KELLY AND M/U 4 1/2" KELLY. TEST KELLY AND LPR'S, INSTALL
WEAR RING. P/U HES EZSV AND RIH SLOWLY. SET EZSV AND GET
INJECTION RATES. TESTED CASING WHILE BATCHMIXING CEMENT.
PJSM. PUMP 5 BBLS WATER AND TEST LINES. PUMP 72 BBLS
SLURRY AND DISPLACED WITH RIG PUMPS. UNSTING AND REVERSE
CIRCULATED 1 DRILLPIPE VOLUME WHILE MOVING TRUCKS INTO RIG
FOR DISP. DISPLACE WELL TO MUD AND SPOT 18 PPG PILL ON
BOTTOM OF PROJECTED WINDOW. POH AND L/D 9 JTS DRILLPIPE
FOR FUTURE BHA. CLEAN ICE FROM LINES. SLIP DRILLING LINE
AND PUMP PILL. POJ W/ STINGER.
: DS 18-15
~PERATION:
RIG : NABORS 2ES
PAGE: 2
05/05/95 (4)
TD: 8225
PB: 0
05/06/95 ( 5)
TD: 8175
PB: 0
05/07/95 ( 6)
TD: 8590
PB: 8151
05/08/95 ( 7)
TD: 8646' (8646)
POH W/ MILLING ASSEMBLY MW: 0.0
POH AND L/D CMT STINGER. P/U MILLING BHA. RIH W/ MILLING
ASSY TO 8175'. MILL 50' WINDOW F/ 8175 - 8225'. CLEANED
UP ONE PACKOFF IMMED. AFTER MILLING COLLAR, PLUS CONNECTION
TOOK 1 HR. MILLING ROP VARIED FROM 2-6 FPH. GOT BACK LOTS
OF CMT AND FAIR AMT SHALE EST. RECOVERY 90% OF METAL
FILLINGS. FILLINGS VERY WELL SHAPED, MAJORITY SMALL AND
CURLED OVER. PUMPED AROUND SWEEP AND CIRC UNTIL SHAKERS
CLEANED UP. POH W/ MILLING ASSY. NO PROBLEMS CLOSING
BLADES OR COMING UP THROUGH CASING.
RIH W/ KICKOFF BHA MW: 0.0
POH AND LD BHA. SERVICE WEAR RING, WASH AND REAM THROUGH
WINDOW. BATCH MIX CEMENT W/ BJ. TESTED LINES, PUMPED 20
BBLS WATER AND 37 BBLS 17.1 CMT FOLLOWED BY 5 BBLS WATER.
DISPLACED @ 8 BPM TO BALANCE POINT. POH 10 STANDS SLOWLY.
REVERSE CIRC 1 DP VOLUME WHILE SLOWLY INCREASING
BACKPRESSURE AND WATCHING VOLUMES. PJSM. POH WITH MULE
SHOE. PULL WEAR RING, FLUSH AND CLEAN OUT BOPS AND INSTALL
TEST PLUG. TEST BOPS. PU KICKOFF ASSY AND RIH.
DRILLING \ MW: 0.0
POH W/ MULESHOE SLIP AND CUT DRILLING LINE RIH TO 7787'
BEGAN PRECAUTIONARY WASHING. WASH TO 7901', TAG SOFT
CEMENT UNTIL 7950' THEN VERY FIRM. DRILLING FIRM CEMENT
·
TO 8180' CIRC AND COND MUD. KICK OFF. PAST STUMP,
DRILLING ONWARDS F/ 8225 - 8590'. DRILLING ~N KINGAK SHALE.
MONITOR WELL MW: 0.0 VIS: 0
DRILLING TO 8646'. LOST ALL WOB AND RETURNS SIMULTANEOUSLY,
FLUID LEVELS DROPPED COMPLETLY. FILLING ANNULUS W/ MUD,
SWITCHED TO SEAWATER AFTER 200 BBLS. PUMPED 300 MORE BBLS
SEAWATER BEFORE HOLE FILLED. SPOTTED 40 PPB OM SEAL PLUG.
POH 5 STDS TO SHOE.. TOOK 89 BBLS TO FILL HOLE OVER
DISPLACEMENT. SHOT FLUID LEVEL, LEVEL @ 20' IN DRILLPIPE.
SPOTTED 90 BBLS BARASEAL @ 40 PPB DOWN STRING AND DISPLACED
W/ SEAWATER. MONITORED WELL LOSS RATES BETWEEN 25 - 48.
TOOK TEMP SURVEY @ SHOE FROM SPERRY SUN. HONITRORED LOSSES
WHILE MIXING 100 BBLS MAP, A-SEAL @ MI. DISPLACED MARASEAL
TO OPEN HOLE. POH 5 STANDS WHILE POH. MONITOR WELL BEFORE
PROCEEDING WITH SQUEEZING. POH 10 MORE STANDS, BIT @
6750'. MONITOR WELL, LOSSES DOWN TO ZERO, VERY SLIGHT FLOW
FROM WELL. CBU. MONITOR WELL WHILE BUILDING MUD FROM
SEAWATER IN PITS TO 9.2 PPG KCL MUD.
S EP ,9
Oil & Gas Cons. Commission
Anchorage
: DS 18-15
OPERATION:
RIG : NABORS 2ES
PAGE: 3
05/09/95 (8)
TD: 8646' ( 0)
05/10/95 (9)
TD: 7989' ( 0)
05/11/95 (10)
TD: 8200' ( 211)
05/12/95 ( 11)
TD: 8895' ( 695)
CIRC PRIOR T/CMT
MW: 0.0 VIS: 0
RIH T/SHOE & CIRC 9.2 MUD INTO WELL SLOWLY. FULL RETURNS
T/SURFACE UNTIL WATER/MUD INTERFACE APPROACHING SURFACE,
THEN LOST RETURNS. TOOK 32 BBLS OF SEAWATER T/FILL HOLE.
LOSS RATE =80 BBLS/HR. PUMP 55 BBLS LCM PILL (30 PPB OM
SEAL + 15 PPB BAROSEAL) IN PLACE WHICH CUT LOSS RATE T/36
BPH. CUB T/CLEAR ANNULUS BEFOR POOH, HEAVY GAS-CUT MUD.
POOH, FLOW CHECK EVERY 30 STNDS WHILE COMING OUT. LOSS RATE
WHILE POOH = 35 BPH. STAND BACK BHA, LD MWD. PU MULESHOE &
TIH W/DP T/TOP OF THE WINDOW @ 8175. CBU, CLEAR GAS BUBBLE
OUT @ 4600 STKS. LOSS RATE CHANGING T/25 BPH. RIH T/8560
SLOWLY. PUMPING 50 BBLS OF LCM (38 PPB BAROSEAL MED, 12 PPB
BAROSEAL COARSE) IN ADVANCE OF CMT.
DRILLING FIRM CEMENT MW: 0.0 VIS: 0
PUMPED 40 BBLS BARO-SEAL COARSE AND MED @ 80 PPB, THEN POH
TO SHOE. MONITOR WELL, NO LOSSES. RIH TO 8560' AND BATCH
MIX CEMENT W/ BJ. TEST LINES. PUMP 20 BBLS WATER, 65 BBLS
KOP SLURRY @ 17.1 AND 5 BBLS WATER. SWITCHED TO RIG PUMPS
AND DISPLACED ~O BALANCE POINT. SAW NO INDICATIONS OF CMT
BEING LIFTES, WHICH WOULD INDICATE LOSSES, BUT HAD FULL
RETURNS THROUGHOUT JOB. ETOC @ 7650' POH SLOWLY, PIPE
PULLING DRY, THEN CAME WET @ 7500' CIRC W/ FULL RETURNS,
SMALL GAS BUBBLE @ SURFACE. SLIP ~RILLING LINE, TIGHTEN
AND ADJUSTED BRAKE BANDS AND ROLLERS. POH. L/D 27 JTS
DRILL PIPE AND MULESHOE. TEST BOPS. P/U CLEANOUT ASSY AND
RIH TO 7657' TAGGED CMT. DRILLED SOFT CMT 7657 - 7730'.
FIRM @ 7730' HAD TO PICK UP AND CIRC OUT GAS BUBBLE.
DRILLING CMT @ 7989'.
KICKING OFF CMT PLUG MW: 0.0 VIS: 0
DRILLING FIRM CEMENT. TO 8180'. CIRC AND COND MUD. POH.
LD BHA #3 AND PU BHA #4. RIH TO TOC. CIRC AND COND MUD,
CHANGE OUT SHAKER SCREENS @ BOTTOMS UP. KICKING OFF PLUG
TIME DRILLING AND SLIDING.
POH FOR BHA CHANGE MW: 0.0 VIS: 0
KICKING OFF, PAST STUMP. DRILLING TO 8680'_ NOW PAST TVD
WHERE WELL LOST CIRC. OFF TROUBLE TIME. SLIDING AND
DRILLING TO 8895'. CBU AND FINISH BRINGING SWEEP AROUND.
POH. PULLED WET TO SHOE. PULLED +50K ON STD #6, WIPED OUT
TO NORMAL AFTER 3 PASSES UPWARD. REST OF PIPE PULLED WELL;
COULD SEE STAB'S BUMPING THROUGH WINDOW, BUT WERE OF NO
CONSEQUENCE. HOLL FILL NORMAL.
: DS 18-15
OPERATION:
RIG : NABORS 2ES
PAGE: 4
05/13/95 (12)
TD: 9022' ( 127)
05/14/95 (13)
TD: 9547' ( 525)
05/15/95 (14)
TD: 9547' ( 0)
05/16/95 ( 15) 7
TD: 9547' ( 0)
RIH W/ BUILDING ASSY MW: 0.0 VIS: 0
POH, CHANGE OUT BHA AND RIH. HOLE IN GOOD SHAPE DURING
TRIP IN, EXPERIENCED 35 BBLS LOSSES DURING TRIP. SERVICED
WEAR RING. MONITORED WELL BEFORE LEAVING BOTTOM AND AT
SHOE, PRE TRIP. SLIP AND CUT DRLG LINE. RIH TO 8822'
REAMED TO BOTTOM PRECAUTIONARY F/ 8822 - 8895'. NO FILL ON
BOTTOM. DRILLING INTO ZONE 2. LAUNCHED LV SWEEP. CBU AND
CLEAN UP SHAKERS AFTER SWEEP CAME AROUND. PUMPED PILL AND
MONITORED WELL. POH TO PICK UP BUILD BHA. HOLE TAKING
MORE FLUID THAN CALCULATED TO FILL, VERY STABLE DRAG WHILE
POH INTO SHOE. MONITORED WELL AT SHOE BEFORE POH. LD BHA
%5 AND PU BHA #6. ORIENT TOOLS AND DO MWD FLOW TEST. RIH
AND BREAK CIRC @ 4488' AND 8154'
POH FOR LOGS MW: 0.0 VIS: 0
RIH TO BOTTOM, NO PROBLEM IN OPEN HOLE, NO FILL ON BOTTOM.
DRILLING, BUILDING ANGLE AND TURNING. SHAKERS STARTED
BLINDING AND MUD BECAME GAS CUT. CHANGING SCREENS AS
ASPHALTINE MATERAIL PRECIPIPITATING OUT OF MUD. NOTHING
UNUSUAL IN SAMPLES.. DRILLING TO 7" TD @ 9547', 8717' TVD.
GAS CUT MUD RETURNS, SLIDING ROPS TO 100'/HR RAISE MW TO
10.1 WHILE CIRC AROUND SWEEP AND CLEAN UP SHAKER. MONITOR
WELL, STABLE. SHORT TRIP 10 STANDS TO CHECK OPEN HOLE,
5-10K DRAG MAX DURING TRIP. CBU, MUD RETURNS STABLE. POH
SLM IN PREP FOR RUNNING DRILLPIPE CONVEYED LOGS.
RIH W/ HOLE OPENER MW: 0,0 VIS: 0
POH. TIGHT SPOT @ 8480'. SLM, NO CORRECTION. PU WESTERN
ATLAS DP CONVEYED LOG TOOLS AND RIH TO SHOE. MU SIDE ENTRY
SUB AND RIH. RAN CHT/TEMP/GR/CN/AC LOG. RE-LOGGED 9175 -
9542' THEN BACK UP TO SHOE FROM TD. POH W/ SES AND CLEAR
,
WIRELINE TOOLS FROM DRILL STRING. SLIP DRILLING LINE.
LOGS SHOWED 70' LOC,. GOC HIGHER THAN EXPECTED AND GOOD
POROSITY. POH W/ LOGGING TOOLS. CLEAR FLOOR, AND PU BHA
%7.
RIH W/ 7" LINER MW: 0.0 VIS: 0
RIH W/ HOLE OPENER. KELLIED UP AND REAMED. REAMED HOLE
FROM 9035 - 9141' TANGO SHALE 9080 - 9120' RIH TO
9215' KELLY UP AND REAM ALL THE YAY TO TD. NO FILL ON
BOTTOM. CIRC AROUND LV SWEEP AND CLEAN UP SHAKERS. 15 STD
SHORT TRIP INTO SHOE. RIH TO BOTTOM WITH NO PROBLEMS. CBU,
SPOTTED HI-VIS LUBETEX PILL ACROSS OPEN HOLE. DROPPED 2"
RABBIT. POH SLOWLY THROUGH OPEN HOLE, PULLED +20 THROUGH
TANGO, BUT CLEANED RIGHT UP. RU NCS AND PU 7" LINER AND
BAKER HANGER EQUIPMENT. CIRC CAPICITY OF CASING. RIH
SLOWLY W/ 7" LINER ALMOST TO 9 5/8" SHOE.
: DS 18-15
OPERATION:
RIG : NABORS 2ES
PAGE: 5
05/17/95 (16)
TD: 9547' ( 0)
05/18/95 (17)
TD:10110' ( 563)
05/19/95 (18)
TD:10110' ( 0)
05/20/95 (19)
TD:10110
PB:10086
RIH W/ DRILLOUT BHA MW: 0.0 VIS: 0
RIH TO SHOE WITH LINER. CIRC VOLUME OF LINER AND MU LAKE
CHARLES CMTING HEAD. RIH TO TD W/ LINER, NO PROBLEMS.
RECIPROCATE LINER WHILE STAGING UP CIRCULATING RATE. HOLE
WAS PACKING OFF OAT THAT RATE, SUSPENDED RECIPROCATING TO
MINIMIZE DAMAGE DONE BY TURBULATORS. PACKING OFF SUBSIDED,
CONTINUED CIRCULATION W/ NO LOSSES. BATCH MIXED CMT.
PUMPED 5 BBLS KCL PREFLUSH AND TESTED LINES. PUMPED 62
BBLS SLURRY FOLLOWED BY 5 BBLS WATER, THEN SWITCHED TO RIG
PUMPS FOR DISPLACEMENT. POSITIVE WIPER PLUG LATCH UP,
BUMPED PLUG W. 2218 STK'S. REVERSE CIRC. LD CMT HEAD AND
MONITOR WELL. LD 33 JTS DRILL PIPE. SLIP AND CUT DRILLING
LINE. POH AND LD BAKER RUNNING TOOL. PULL WEAR RING AND
INSTALL TEST PLUG. TEST BOPS. TESTED ALL 3 1/2" AND 4
1/2" SURF EQUIPMENT. PULLED TEST PLUG AND INSTALLED WEAR
RING. PU BHA #8. TESTED MWD AFTER ORIENTING DIRECTIONAL
EQUIPMENT. PU 69 JTS 3 1/2" 'G' DRILL PIPE AND RIH.
CBU MW: 0.0 VIS: 0
CONTINUE RIH, TAGGED CEMENT @ 9378' TESTED
LAP/LINER/CASInG. NO LOSS. DRILLED LC @ 9460', FC @ 9503',
AND FS @ 9545'; 10' NEW HOLE TO 9557'. DISPLACED TO FLOPRO,
CLEANED PITS AND SHAKERS. DRILLED F/ 9557 - 10110'. CBU.
DISPLACING TO FILT. SEAH20 MW: 0.0 VIS: 0
CIRCULATED HOLE CLEAN. SHORT TRIPPED TO SHOE. NO EXCESS
DRAG. CBU, SPOTTED 20 BBL PILL TREATED W/ 1,DRUM LUBETEX
IN OPEN HOLE. POH. NO EXCESS DRAG, HOLE FILL UP NORMAL.
LD BHA #8. CLEARED FLOOR. RU CASING TOOLS. RAN GUIDE
SHOE, PACK OFF BUSHING, 15 JTS 12.6# L-80 NSCT SLOTTED
LINER, PORTED JT, 1 JT SOLID 12.6# L-80 NSCT LINER, TIW SS
PACKER. RIH ON DP TO BOTTOM. DROPPED BALL AND DISPLACED
SAME TO CATCHER. ISOLATED SURFACE EQUIPMET, PULL TESTED
./~ PACKER AND RETESTED, ANNULUS, HELD PRESSURE. FLUID RETURNS
· THRU DP INDICATE TIW FAILURE IN EITHER PACKER OR O-RING IN
RUNNING TOOL. RELEASED RUNNING TOOL AND BEGAN DISPLACING
TO FSW.
CIRC CORROSION INHIBITOR MW: 0.0
CONTINUED DISPLACEMENT TO FSW. SPOTTED 12 BBLS
HYPOCHLORITE PILL IN LINER, POH 10 STANDS AND CIRCULATED
UNTIL RETURNS CLEAN. POH. STOOD BACK 64 STANDS, LDDP.
SLIPPED DRLG LINE. LDDP AND 2 - 1/16" HYDRIL CIRCULATING
STRING. CLEARED FLOOR. RU NCS. RAN 204 JTS 4 1/2" 12.6#
NSCT L-80 TUBING, 3 4 1/2" X 1 - 1/2" GLM, TR SSSV, 7" X 4
- 1/2" BAKER S-3 PACKER. MU CONTROL LINE TO SSSV AND
TESTED SAME. USED 57 SS CONTROL LINE BANDS; 4 1/2" NSCT MU
4000 FT#. MU HANGER AND LANDING JT. REVERSED IN SEAWATER
TREATED W/ 25 GAL PER 100 BBLS COREXIT.
: DS 18-15
OPERATION:
RIG : NABORS 2ES
PAGE: 6
05/21/95 (20)
TD:10110
PB:10086
RELEASE RIG MW: 0.0
DROPPED ROD AND BALL, LANDED HANGER, RILDS AND LD LANDING
JT. SET PACKER AND HELD TUBING. TESTED ANNULUS. SET BPV,
ND BOPE, NU ADAPTER FLANGE. RU SSSV CONTROL LINES AND
TESTED SAME. NU TREE. RU LUBRICATOR AND PULLED BPV, SET
TREE TEST PLUG. TESTED TREE. PULLED TREE TEST PLUG. RU
AND TESTED ANNULUS. NO LOSS. BLED OFF TUBING PRESSURE AND
SHEARED RP VALVE. FREEZE PROTECTED WELL W/ 140 BBLS
DIESEL. SET BPV AND INSTALLED TREE VALVES AND FLANGES.
SECURED WELL. RELEASED RIG @ 2000 HRS ON 05/20/95.
SIGNATURE:
(drilling superintendent)
DATE:
S~
SHARED SERVICES DRILLING
PBU/18-15A
500292175501
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/28/9
RY-STJN DRILLING SERVICES
ANCHOPuAGE ALASKA
DATE OF SURVEY: 051895
MWD SURVEY
JOB NUMBER: AK-MW-50040
KELLY BUSHING ELEV. = 47.90 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS
INCLN DIRECTION
DG MN DEGREES DG/100
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
VERT.
SECT.
8065 7725.00 7677.10
8180 7811.31 7763.41
8242 7858.33 7810.43
8368 7956.04 7908.14
8400 7981.08 7933.18
40 54 S 78.00 E .00
41 49 S 74.64 E 2.09
39 35 S 82.50 E 9.01
38 42 S 79.10 E 1.85
38 17 S 78.20 E 2.15
282.74S 1702.25E 655.91
300.73S 1776.05E 689.93
308.79S 1815.61E 706.63
321.48S 1894.11E 736.53
325.40S 1913.64E 744.72
8431 8005.51 7957.61
8462 8030.12 7982.22
8494 8055.66 8007.76
8526 8081.15 8033.25
8558 8106.48 8058.58
37 42 S 77.30 E 2.64
37 12 S 76.40 E 2.39
36 54 S 75.50 E 1.94
37 30 S 71.70 E 7.42
37 47 S 68.00 E 7.12
329.45S 1932.29E 752.83
333.73S 1950.64E 761.11
338.41S 1969.34E 769.85
343.88S 1987.89E 779.32
350.61S 20Q6.23E 789.98
8589 8130.93 8083.03
8620 8155.34 8107.44
8651 8179.72 8131.82
8683 8204.93 8157.03
8714 8229.59 8181.69
38 5 S 69.90 E 3.89
38 0 S 69.80 E .38
38 17 S 68.50 E 2.77
37 42 S 65.40 E 6.25
36 54 S 62.50 E 6.23
357.45S 2024.02E 800.63
364.04S 2041.96E 811.05
370.85S 2059.85E 821.69
378.56S 2077.98E 833.25
386.80S 2094.85E 845.06
8745 8254.35 8206.45
8775 8278.31 8230.41
8806 8303.10 8255.20
8838 8328.83 8280.93
8868 8353.08 8305.18
37 5 S 63.40 E 1.86
36 54 S 64.10 E 1.55
36 54 S 62.60 E 2.90
36 5 S 58.00 E 8.91
36 0 S 56.00 E 3.94
395.29S 2111.47E 857.04
403.27S 2127.66E 868.44
411.62S 2144.29E 880.29
421.04S 2160.82E 893.17
430.65S 2175.62E 905.84
8899 8378.15 8330.25
8930 8403.13 8355.23
8962 8428.80 8380.90
8993 8453.58 8405.68
9025 8478.90 8431.00
36 5 S 52.60 E 6.46
36 30 S 51.40 E 2.63
36 47 S 51.10 E 1.09
37 5 S 51.90 E 1.83
38 17 S 50.00 E 5.22
441.29S 2190.43E 919.53
452.59S 2204.89E 933.77
464.55S 2219.79E 948.75
476.15S 2234.37E 963.32
488.48S 2249.56E 978.73
9055 8501.86 8453.96
9086 8524.33 8476.42
9118 8546.59 8498.69
9149 8567.56 8519.66
9181 8588.08 8540.18
41 47 S 47.20 E 13.12
45 17 S 44.00 E 13.34
46 30 S 42.90 E 4.49
48 24 S 40.00 E 9.22
51 47 S 37.50 E 12.20
501.25S 2264.03E 994.41
516.20S 2279.27E 1012.39
532.88S 2295.07E 1032.18
550.00S 2310.17E 1052.24
569.15S 2325.53E 1074.34
9213 8607.25 8559.35
9244 8624.86 8576.96
9276 8642.10 8594.20
9308 8658.24 8610.34
9339 8672.94 8625.04
54 35 S 33.60 E 13.10
56 12 S 33.10 E 5.33
58 35 S 30.10 E 10.89
60 47 S 29.00 E 7.49
62 35 S 27.30 E 7.55
590.00S 2340.40E 1097.98
611.31S 2354.43E 1121.89
634.27S 2368.54E 1147.42
658.30S 2382.16E 1173.89
682.37S 2395.04E 1200.22
MICROI:: LMED
SP~ ~{Y-SUN DRILLING SERVICES
ANCHORAGE ALAS KA
PAGE
SHARED SERVICES DRILLING
PBU/18-15A
500292175501
NORTH SLOPE BOROUGH
COHPUTATION DATE: 5/28/9
DATE OF SURVEY: 051895
MWD SURVEY
JOB NrUMBER: AK-MW-50040
KELLY BUSHING ELEV. = 47.90 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS
INCLN DIRECTION
DG MN DEGREES DG/100
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
VERT.
SECT.
9365 8684.23 8636.33 65 54 S 25.60 E 13.99 703.33S 2405.46E
9400 8697.05 8649.15 71 5 S 25.00 E 14.94 732.76S 2419.37E
9431 8705.88 8657.98 75 48 S 25.00 E 15.16 759.69S 2431.92E
9462 8712.14 8664.24 80 54 S 24.50 E 16.53 787.25S 2444.63E
9494 8715.76 8667.86 86 5 S 24.10 E 16.30 816.22S 2457.71E
1222.98
1254.78
1283.83
1313.53
1344.69
9529 8716.89 8668.99 90 11 S 21.50 E 13.87 848.46S 2471.26E
9561 8716.53 8668.63 91 5 S 19.20 E 7.72 878.45S 2482.39E
9592 8715.88 8667.98 91 18 S 20.40 E 3.92 907.61S 2492.88E
9623 8715.31 8667.41 90 48 S 21.40 E 3.61 936.57S 2503.94E
9655 8715.09 8667.19 90 0 S 21.10 E 2.67 966.39S 2515.54E
1379.14
1410.86
1441.63
1472.32
1503.98
9687 8715.14 8667.24 89 48 S 21.70 E 1.98 996.18S 2527.21E
9717 8715.25 8667.35 89 48 S 21.60 E .33 1024.07S 2538.28E
9749 8715.36 8667.46 89 48 S 21.50 E .31 1053.83S 2550.03E
9780 8715.74 8667.84 88 48 S 21.30 E 3.29 1082.69S 2561.34E
9811 8716.55 8668.65 88 11 S 20.00 E 4.62 1111.68S 2572.27E
1535.63
1565.28
1596.92
1627.58
1658.28
9843 8717.78 8669.88 87 24 S 20.60 E 3.12 1141.67S 2583.37E
9874 8719.05 8671.15 87 54 S 20.60 E 1.61 1170.67S 2594.26E
9905 8720.26 8672.36 87 35 S 19.30 E 4.30 1199.78S 2604.83E
9937 8721.83 8673.93 86 48 S 19.00 E 2.67 1229.97S 2615.32E
9967 8723.79 8675.89 85 41 S 19.80 E 4.53 1258.21S 2625.26E
1689.99
1720.69
1751.43
1783.20
1812.94
9998 8726.36 8678.46 84 48 S 18.30 E 5.63 1287.41S 2635.34E
10030 8729.45 8681.55 84 5 S 17.60 E 3.09 1317.70S 2645.16E
10061 8732.58 8684.68 84 18 S 18.80 E 3.90 1347.00S 2654.79E
10110 8737.45 8689.55 84 18 S 18.80 E .00 1393.16S 2670.50E
1843.65
1875.38
1906.09
1954.59
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 3012.05 FEET
AT SOUTH 62 DEG. 26 MIN. EAST AT MD = 10110
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 167.09 DEG.
ORIGINAL
SPE._.{Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/18-15A
500292175501
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/28/95
DATE OF SURVEY: 051895
JOB NUMBER: AK-MW-50040
KELLY BUSHING ELEV. = 47.90 FT.
OPEP, ATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8065 7725.00 7677.10 282.74 S 1702.25 E 340.00
9065 8509.25 8461.35 505.88 S 2268.93 E 555.75 215.75
10065 8732.98 8685.08 1350.77 S 2656.07 E 1332.02 776.27
10110 8737.45 8689.55 1393.16 S 2670.50 E 1372.55 40.53
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPE~.~Y-SUN DRILLING SERVICES
ANCHORAGE ALAS KA
PAGE
SHARED SERVICES DRILLING
PBU/18-15A
500292175501
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/28/95
DATE OF SURVEY: 051895
JOB NUMBER: AK-MW-50040
KELLY BUSHING ELEV. = 47.90 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
8065 7725.00 7677.10 282.74 S 1702.25 E 340.00
8095 7747.90 7700.00 286.86 S 1721.65 E 347.40
8228 7847.90 7800.00 307.47 S 1807.00 E 380.51
8357 7947.90 7900.00 320.24 S 1887.70 E 409.67
7 .40
33.11
29.16
8484 8047.90 8000.00 336.96 S 1963.70 E 436.40
8610 8147.90 8100.00 362.03 S 2036.50 E 462.66
8736 8247.90 8200.00 393.09 S 2107.12 E 489.02
8861 8347.90 8300.00 428.57 S 2172.48 E 513.69
8985 8447.90 8400.00 473.50 S 2230.99 E 537.98
26.72
26.26
26.36
24.67
24.29
9119 8547.90 8500.00 533.93 S 2296.01 E 572.02
9287 8647.90 8600.00 642.60 S 2373.34 E 639.33
10110 8737.45 8689.55 1393.16 S 2670.50 E 1372.55
34.04
67.31
733.22
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
ORIGINAL
SHARED SERVICES DRILLING
PBU/18-15A ST
500292175570
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/28/95
. SPE~mY-SUN DRILLING SERVICES ~ PAGE
ANCHORAGE ALASKA ORIGINAL
DATE OF SURVEY: 050995
MWD SURVEY
JOB NUMBER: AK-MW-50040
KELLY BUSHING ELEV. = 47.90 FT.
OPEtLATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
8065 7725.00 7677.10 40 54 S 78.00 E .00 282.74S 1702.25E 655.91
8180 7811.31 7763.41 41 49 S 74.64 E 2.09 300.73S 1776.05E 689.93
8302 7907.25 7859.35 34 42 S 59.30 E 9.70 329.33S 1845.39E 733.30
8332 7932.03 7884.13 33 54 S 60.10 E 3.06 337.86S 1859.98E 744.88
8364 7958.63 7910.73 33 42 S 55.40 E 8.19 347.35S 1875.03E 757.49
8395 7984.54 7936.64 32 54 S 54.10 E 3.46 357.17S 1888.93E 770.17
8490 8065.16 8017.26 31 0 S 48.90 E 3.52 388.39S 1928.27E 809.39
8521 8091.73 8043.83 31 0 S 49.60 E 1.16 398.82S 1940.37E 822.25
8554 8120.05 8072.15 30 47 S 48.40 E 1.96 409.93S 1953.16E 835.95
8585 8146.82 8098.92 29 42 S 45.40 E 6.03 420.59S 1964.56E 848.89
8646 8199.81 8151.91 29 42 S 45.40 E .00 441.82S 1986.08E 874.38
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 2034.63 FEET
AT SOUTH 77 DEG. 27 MIN. EAST AT MD = 8646
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 167.09 DEG.
SPA ~<Y-SUN DRILLING SERVICES
ANCHO~GE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU/18-15A ST
500292175570
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/28/95
DATE OF SURVEY: 050995
JOB NUMBER: AK-MW-50040
KELLY BUSHING ELEV. = 47.90 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
8065 7725.00 7677.10
8646 8199.81 8151.91
282.74 S 1702.25 E 340.00
441.82 S 1986.08 E 446.19 106.19
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
ORIGINAL
SPE~..<Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/18-15A ST
500292175570
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/28/95
DATE OF SURVEY: 050995
JOB NUMBER: AK-MW-50040
KELLY BUSHING ELEV. = 47.90 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTAiqGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
8065 7725.00 7677.10 282.74 S 1702.25 E 340.00
8095 7747.90 7700.00 286.86 S 1721.65 E 347.40
8227 7847.90 7800.00 310.33 S 1805.50 E 380.06
8351 7947.90 7900.00 343.43 S 1869.03 E 403.20
7.40
32.66
23 . 14
8469 8047.90 8000.00 381.61 S 1920.31 E 421.92
8586 8147.90 8100.00 421.02 S 1965.00 E 438.34
8625 8181.57 8133.67 434.51 S 1978.67 E 443.43
18.72
16.42
5.09
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
ORIGINAL
SPE_ _~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/18-15A
500292175501
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/28/9
TRUE SUB-SEA COURS COURSE
MEASD VERTICAL VERTICAL INCLN DIRECTION
DEPTH DEPTH DEPTH DG MN DEGREES
DATE OF SURVEY: @~1895
MWD SURVEY //,Z~ i
OPEP~ATOR: ARCO ALASKA INC
DLS TOTAL
RECTANGULAR COORDINATES VERT.
DG/100 NORTH/SOUTH EAST/WEST SECT.
8065 7725.00 7677.10 40 54
8180 7811.31 7763.41 41 49
8242 7858.33 7810.43 39 35
8368 7956.04 7908.14 38 42
8400 7981.08 7933.18 38 17
S 78.00 E .00 282.74S 1702.25E 655.91
S 74.64 E 2.09 300.73S 1776.05E 689.93
S 82.50 E 9.01 308.79S 1815.61E 706.63
S 79.10 E 1.85 321.48S 1894.11E 736.53
S 78.20 E 2.15 325.40S 1913.64E 744.72
.8431 8005.51 7957.61 37 42
8462 8030.12 7982.22 37 12
8494 8055.66 8007.76 36 54
8526 8081.15 8033.25 37 30
8558 8106.48 8058.58 3.7 47
8589 8130.93 8083.03 38 5
8620 8155.34 8107.44 38 0
8651 8179.72 8131.82 38 17
8683 8204.93 8157.03 37 42
8714 8229.59 8181.69 36 54
S 77.30 E 2.64 329.45S 1932.29E 752.83
S 76.40 E 2.39 333.73S 1950.64E 761.11
S 75.50 E 1.94 338.41S 1969.34E 769.85
S 71.70 E 7.42 343.88S 1987.89E 779.32
S 68,.00 E 7.12 350.61S 2006.23E 789.98
S 69.90 E 3.89 357.45S 2024.02E 800.63
S 69.80 E .38 364.04S 2041.96E 811.05
S 68.50 E 2.77 370.85S 2059.85E 821.69
S 65.40 E. 6.25 378.56S 2077.98E 833.25
S 62.50 E 6.23 386.80S 2094.85E 845.06
8745 8254.35
8775 8278.31
8806 8303.10
8838 8328.83
8868 8353.08
8899 8378.15
8930 8403.13
8962 8428.80
8993 8453.58
9025 8478.90
8206.45 37 5
8230.41 36 54
8255.20 36 54
8280.93 36 5
83~5.18 36 0
8330.25 36 5
8355.23 36 30
8380.90 36 47
8405.68 37 5
8431.00 38 17
S 63.40 E 1.86 395.29S 2111.47E 857.04
S 64.10 E 1.55 403.27S 2127.66E 868.44
S 62.60 E 2.90 411.62S 2144.29E 880.29
S 58.~00 E 8.91 421.04S 2160.82E 893.17
S 56'.00 E 3.94 430.65S 2175.62E 905.84
S 52.60 E 6.46 " 441.29S 2190.43E 919.53
S 51.40-E 2.63 452.59S 2204.89E 933.77
S 51.10 E 1.09 464.55S 2219.79E 948.75
S 51.90 E 1.83 476.15S 2234.37E 963.32
S 50.00 E 5.22 488.48S 2249.56E 978.73
9055 8501.86
9086 8524.33
9118 8546.59
9149 8567.56
9181 8588.08
8453.96 41 47
8476.42 45 17
8498.69 46 30
8519.66 48 24
8540.18 51 47
S 47.20 E 13.12 501.25S 2264.03E 994.41
S 44.00 E 13.34 516.20S 2279.27E 1012.39
S 42.90 E 4.49 532.88S 2295.07E 1032.18
S 40.00 E 9.22 550.00S 2310.17E 1052.24
S 37.50 E 12.20 569.15S 2325.53E 1074.34
9213 8607.25
9244 8624.86
9276 8642.10
9308 8658.24
9339 8672.94
8559.35 54 35
8576.96 56 12
8594.20 58 35
8610.34 60 47
8625.04 62 35
S 33.60 E 13.10 590.00S 2340.40E 1097.98
S 33.10 E 5.33 611.31S 2354.43E 1121.89
S 30.10 E 10.89 634.27S 2368.54E 1147.42
S 29.00 E 7.49 658.30S 2382.16E 1173.89
S 27.30 E 7.55 682.37S 2395.04E 1200.22
SPL~.RY-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/18 - 15A
500292175501
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/28/95
DATE OF SURVEY: 051895
MWD SURVEY
JOB NUMBER: AK-MW-50040
KELLY BUSHING ELEV. = 47.90 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA COURS COURSE DLS
MEASD VERTICAL VERTICAL INCLN DIRECTION
DEPTH DEPTH DEPTH DG MN DEGREES DG/100
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
VERT.
SECT.
9365 8684.23 8636.33 65 54 S 25.60 E 13.99
9400 8697.05 8649.15 71 5 S 25.00 E 14.94
9431 8705.88 8657.98 75 48 S 25.00 E 15.16
9462 8712.14 8664.24 80 54 S 24.50 E 16.53
9494 8715.76 8667.86 86 5 S 24.10 E 16.30
703.33S 2405.46E
732.76S 2419.37E
759.69S 2431.92E
787.25S 2444.63E
816.22S 2457.71E
1222.98
1254.78
1283.83
1313.53
1344.69
9529 8716.89 8668.99 90 11 S 21.50 E 13.87
9561 8716.53 8668.63 91 5 S 19.20 E 7.72
9592 8715.88 8667.98 91 18 S 20.40 E 3.92
9623 8715.31 8667.41 90 48 S 21.40 E 3.61
9655 8715.09 8667.19 90 0 S 21.10 E 2.67
9687 8715.14 8667.24 89 48 S 21.70 E 1.98
9717 8715.25 8667.35 89 48 S 21.60 E .33
9749 8715.36 8667.46 89 48 S 21.50 E .31
9780 8715.74 8667.84 88 48 S 21.30 E 3.29
9811 8716.55 8668.65 88 11 S 20.00 E 4.62
848.46S 2471.26E
878.45S 2482.39E
907.61S 2492.88E
936.57S 2503.94E
966.39S 2515.54E
996.18S 2527.21E
1024.07S 2538.28E
1053.83S 2550.03E
1082.69S 2561.34E
1111.68S~ 2572.27E
1379.14
1410.86
1441.63
1472.32
1503.98
1535.63
1565.28
1596.92
1627.58
1658.28
9843 8717.78 8669.88 87 24 S 20.60 E 3.12 1141.67S 2583.37E
9874 8719.05 8671.15 87 54 S 20.60 E 1.61 1170.67S 2594.26E
9905 8720.26 8672.36 87 35 S 19.30 E 4.30 1199.78S 2604.83E
9937 8721.83 8673.93 86 48 S 19.00 E 2.67 1229.97S 2615.32E
9967 8723.79 86~.89 85 41 S 19'80 E 4.53 1258.21S 2625.26E
9998 8726.36 ~8678.46 84 48 S 18.30 E 5.63 1287.41S 2635.34E
10030 8729.45 ~ 8681.55 84 5 S 17.60 E 3.09 1317.70S 2645.16E
10061 8732.58 8684.68 84 18 S 18.80 E 3.90 1347.00S 2654.79E
10110 8737.45 8689.55 84 18 S 18.80 E .00 1393.16S 2670.50E
1689.99
1720.69
1751.43
1783.20
1812.94
1843.65
1875.38
1906.09
1954.59
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 3012.05 FEET
AT SOUTH 62 DEG. 26 MIN. EAST AT MD = 10110
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 167.09 DEG.
tY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/18-15A ST
500292175570
NORTH SLOPE BOROUGH
COMPUTATION DATE: 5/28/95
DATE OF SURVEY: 050995
MWD SURVEY
JOB NUMBER: AK-MW-50040
KELLY BUSHING ELEV. = 47.90 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
8065 7725.00 7677.10 40 54 S 78.00 E .00 282.74S 1702.25E 655.91
8180 7811.31 7763.41 41 49 S 74.64 E 2.09 300.73S 1776.05E 689.93
8302 7907.25 7859.35 34 42 S 59.30 E 9.70 329.33S 1845.39E 733.30
8332 7932.03 7884.13 33 54 S 60.10 E 3.06 337.86S 1859.98E 744.88
8364 7958.63 7910.73 33 42 S 55.40 E 8.19 347.35S 1875.03E 757.49
8395 7984.54 7936.64 32 54 S 54.10 E 3.46 357.17S 1888.93E 770.17
8490 8065.16 8017.26 31 0 S 48.90 E 3.52 388.39S 1928.27E 809.39
8521 8091.73 8043.83 31 0 S 49.60 E 1.16 398.82S 1940.37E 822.25
8554 8120.05 8072.15 30 47 S 48.40 E 1.96 " 409.93S 1953.16E 835.95
8585 8146.82 8098.92 29 42 S 45.40 E 6.03 420.59S 1964.56E 848.89
8646 8199.81 8151.91 29 42 ~ 45~40 E .00 441.82S 1986.08E 874.38
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 2034.63 FEET ~
AT SOUTH 77 DEG. 27 MIN. EAST AT MD = 8646
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 167.09 DEG.
./
WELL LOG TRANSMITTAL
To:
ARCO Alaska Inc. / ~/'~,~ August 26, 1995
Attn: Larry Grant, AOGCC /,~ (" 0
P.O. Box 100360
Anchorage, Alaska 99510-0360
MWD Formation Evaluation Logs - DS 18-15A, AK-MW-50040
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
DS 18-15A:
2" x 5" MD Gamma Ray Logs'
50-029-21755-01
1 Blueline
1 Folded Sepia
2" x 5" TVD Gamma Ray Logs:
50-029-21755-01
DS 18-15A PBI:
2" x 5" MD Gamma Ray Logs:
50-029-21755-70
2" x 5" TVD Gamma Ray Logs:
50-029-21755-70
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia Anchorage
·
1 Folded Sepia
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
CI ~ I I_1_ I IM 13
AOGCC
Larry Grant
3001 Porcupine Dr
Anchorage, AK 99501
June 12, 1995
Re: Survey Data- 18-15A, 18-15AST, 18-02A ST (MWD)
18-02A ST (ESS), 15-05A, 15-05A ST
Dear Mr. Grant,
Enclosed are two hard copies of the MWD survey(s).
Well 15-05A
Tied in at 10,190', interpolated depth 10911'
Well 15-05A ST
Tied in at 10,190', interpolated depth 10331'
Well 18-15A
Tie in point 8065', window point 8180', interpolated depth 10110'
Well 18-15A ST
Tie in point 8065', window point 8180', interpolated depth 8646'
Well 18-02A ST (MWD) Re-distributing data - destroy previously received survey. Tie in
point 9711', window point 9735', interpolated depth 10162'.
Well 18-02A ST (ESS)
Re-distributing data - destroy previously received survey. Tie in
point 10162', interpolated depth 10847'.
Please call me at 563-3256 if you have any questions.
Sincerely,
..
Sandra
Region Assistant
Enclosures.
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 19 May 1995
RE: Transmittal of Data
ECC ~: 6430.00
Sent by: PRIORITY MAIL
Data: OH-LDWG
Dear Sir/Madam,
Reference:
18-15A
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Prints/Films:
Prints/Films:
1 BHC-AC/GR FNL BL+RF Run # 1
1 CN/GR FINAL BL+RF Run # 1
1 SSVD FINAL BL+RF Run # 1
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
· ~~o (907) 563-7803
Received by:~"/~//~~~ Date:
RECEIVED
MAY 2 2 1995
Alaska 011 & Gas Cons. Commission
Anchorage
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: David J oh,~,~
Chairman~---~
THRU: Blair Wondzell, ~
P. !. Supervisor
FROM: Bobby Fos~~
Petroleum Inspector
DATE:
FILE NO:
SUBJECT:
May 2, 1995
AEMIEBCD.doc
BOPE Test- Nabors 2ES
ARCO - PBU - DS 18-15A
PTD # 95-0052
Prudhoe Bay Field
Tuesday, May 2, 1995: I traveled this date to ARCO's DS 18-1'5A and witnessed
the initial BOPE test.
As the attached AOGCC BOPE Test Report shows there were no failures of the
equipment tested. The kelly will be changed out on this rig after laying the tubing
down and picking up a string of 3.5" drill pipe for the side track drilling and the
valves will be tested at that time. The lower pipe rams will be test after the tubing is
pulled. The lower rams cannot be closed while the blanking test plug is being used
because of clearence - not enough room between the neck of the plug and the pipe
rams.
The rig was clean and all equipment seemed to be in good working order. The
location was clean and there was good ac, c.~ss to allareas of the rig.
Summary: ! witnessed the BPE test on Nabors rig 2 ES sidetracking ARCO's
DS18-15A - Test time 2 hours - no failures..
Attachmen: .XLS
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: X Workover:
Drig Contractor: NABORS Rig No.
Operator: ARCO ALASKA
Well Name: DS 18-
Casing Size: 4.5" Set @ 9,400'
Test: Initial X Weekly Other
2ES PTD #
Rep.:
Rig Rep.:
Location: Sec.
95-0052
DATE: 5/2/95
Rig Ph.# 659-4835/36
GENE COOPER
KEITH SPOALES
19 T. 11N R. 15E Meridian U
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
PTD On Location OK
Standing Order Posted OK
Well Sign OK
Dri. Rig OK
Hazard Sec. OK
FLOOR SAFETY VALVES: Quan.
Upper Kelly / IBOP NOT~
Lower Kelly / IBOP NOTJ~
Ball Type
Inside BOP
Test
Pressure
500/5,000
P/F
500/5,000
500/5,000 P
500/5,000 P
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valv~es
Kill Line Valves
Check Valve
Quan. Test Press. P/F
P
300/3,000
f 500/5,000 P
NOTE 500/5,000
1 500/5,000 P
I 500/5,000 P
2 500/5,000 P
1 500/5,000 P
N/A
MUD SYSTEM: Visual Alarm
Trip Tank YES YES
Pit Level Indicators YES YES
Flow Indicator YES YES
Meth Gas Detector YES YES
H2S Gas Detector YES YES
CHOKE MANIFOLD:
No. Valves
No. Flanges
Manual Chokes
Hydraulic Chokes
15
Test
Pressure P/F
500/5,000 P
36 500/5,000 P
1 P
Functioned
Functioned
P
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure 0
System Pressure Attained 1
Blind Switch Covers: Master:
Nitgn. Btl's: 4 ~, 2100
3,050 I P
1,650 P
minutes 26 sec.
minutes 30 sec.
YES Remote: YES
Psig.
Number of Failures: 0 ,Test Time: 2.0 Hours. Number of valves tested '/9 Repair or Replacement of Failed
Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7S42 Inspector North Slopc Pagcr No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
The upper and lower kelly will be tested when the kelly is picked up. The lower pipe rams will be tested
after the tubing is pulled from the hole.
Gas dectors tested 4/14/95.
Distribution:
odg-Well File
c - Oper./Rig
c- Database
c - Trip Rpt File
c- Inspector
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
B OBB Y D. FOSTER
FI-021L (Rev. 12/94) AEMIEBCD.XLS
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
P£R IT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redrill[] lb. Type of well. Exploratory[] Stratigraphic Test [] Development Oil []
Re-Entry [] Deepen[] Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. KBE = 48.2 f e et Prudhoe Bay Field/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612, Anchoraae. Alaska 99519-6612 ADL 28321
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
4466' NSL, 4642' WEL, SEC. 19, T11N, R15E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
3604' NSL, 2355' WEL, SEC. 19, T11N, R15E 18-15A U-630610
At total depth 9. Approximate spud date Amount
3177' NSL, 2097' WEL, SEC. 19, T11N, R15E 5/1/95 $200,000.00
:12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
property line
ADL 28307-2097' feet No close approach feet 2560 9942' MD/8718' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 8200 feet Maximum hole angle 42 o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 29# L-80 NSCC 1377' 8065' 7725' 9442' 8718' 300 sx Class "G"
6" 4-1/2" 12. 6# L-80 NSCT 542' 9400' 8668' 9942' 8648' Uncemented slotted liner
RE£Ei
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary APR 'l 2. 199,5
Total depth: measured 11230 feet Plugs (measured)
true vertical 8730 feet A~8,$~,a, ~il & Gas Cons. C0mmi~si0n
Effective depth: measured 11158 feet Junk (measured) ~ch0ra~e
true vertical 8724 feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor 80' 20" 1680 # Poleset 110' 110'
Surface 2646' 13-3/8" 2500 sx CS III & 2686' 2686'
Intermediate 550 sx CS fl
Production 1708' 7" 625 sx Class "G" 8577'-10285' 8089;8667'
Liner 1008' 4-1/2" 10160'-11168' 8672'-8736'
Perforation depth: measured Slottedliner 10285;11158'
true vertical Slotted liner 8676;8736'
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed reportl-1 20 AAC 25.050 requirementsl-I
21. I hereby c,~.i~y that the .~f~egoing,,, is.. true and correct to the best of my knowledge
Signed ,~:~'?¢?'-/-~Z- ,~-~7 ~.-~¢~!~.~,q Title Drillin[t En[tineer Supervisor Date c7/.~.L-~ ~-'-~'-?-~
~' Commission Use Only
Permit Number APl number Approval date _ See cover letter
~".-~.~__.. 50-c2-.~_~-.:~../~...¢",.<--~1 ~-~-',2~/--"~--,~- for other requirements
Conditions of approval Samples required [] Yes [] No Mud Icg required []Yes [] No
Hydrogen sulfide measures [] Yes [] No Directional survey required J~] Yes [] No
Required working pressure for BOP~ri~"¥~:i~'~;t3'~5M;,, ~,,,~-,~ U,,uu y []1OM; 1315M;
Other:
by order of ¢/ /c~-
Approved by David W. Johnston Commissioner tne commission Date /
Form 10-401 Rev. 12-1-85 Submit ir1 i:~licate
I Well Name: IDS 18-15A
Redrill Plan Summary
Type of Redrill (producer or injector): I Producer
Surface Location: 4466 FSL, 4642' FEL, S 19, T1 IN, R15E UM
Target Location: 3604' FSL, 2355' FEL, S19, T11N, R15E UM
Bottom Hole Location: 3177'FSL, 2097'FWL, S19TllN, R15E, UM
I AFE Number: 14J0289 I
] Estimated Start Date:
I Rig: I Nabors 2ES
May 1, 95 [ I Operating days to complete: ] 20
IuD: 19942, I ITVD: 18670ss I IKBE: 148.20
] Well Design (conventional, slimhole, etc.):
{conventional
I Objective: The objective of the proposed plan is to establish long-term, profitable,
Zone 1 production from this well.
Mud Program:
A 10.0 - 10.20 ppg Biozan polymer/KC1 water based mud will be used.
ISpecial design
considerations I none
Depth Density PV YP INT 10MIN FL OIL SOLIDS
(TVD) (PPG) (CP) (g/FY) GEL GEL cc/30min (%) (%)
KOP' 10.0 10 15 5 10 10 0 5
to to to to to to to to to
Target 10.2 18 30 15 29 5 0 8
Flow Pro will be used in zorizontal section from 9442' MD - 9942' MD
I ~o~,. I 9.0 I 10 I 50 I 23 I 29 I
?-~ L o
Directional:
I KOP: [ 8200'MD
Maximum Hole Angle:
Close Approach Well:
42 degrees at the window
NONE
APR 1 2 1995
Aiaska Oil & Gas Cons. Commission
Anchora.~ie
I
t
Page 1
Casing/Tubing Program:
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MD/TVD MDfrVD
8.5" 7" 29# L-80 NSCC 1377 8065/7725 9442/8718
N/A 4.5" 12.6# L-80 NSCT 9190 Surface 9190/8648
6" 4.5" Slotted L-80 NSCT 542 9400/8668 9942/8718
Cement Calculations:
]Liner Size: 17'' ]
Basis:I 20¢o open hole ex~ess, 80' shoe joint, 150' liner lap and 150' excess above linei~ with DP.
Total Cement Volume: 300 sxs of Class G Blend @ 1.17 ft3/sx
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
Hazards and Contingency Plans:
Lost circulation is not expected but it is possible. This is DS 18 !!! The well
trajectory is carefully planned to avoid major faults that would cause massive
losses. However there may be something there that we are not aware of
In the event that the losses are encountered either due to higher MW or faults we
will top set with 7-5/8 casing and after cementing it will drill out with 6-3/4" bit and
run / cmt / perforate 5.5" liner.
PUT RIVER Sand: Is located at 8037' 'l'VDss / 8517' MD. Based on offset data it
is pressured up to 4200 PSI or 10.05 ppg EMW. Our MW when drilling this
formation should be no less then 10.2 ppg. It is possible that this sand is
depleted due to being in communication with Sadlerochit. We drilled this sand in
18-02a and found out that 10.2 ppg MW was adequate.
Gas Cons. Commission
Anch0ra~
Page 2
SUMMARY PROCEDURE:
* Refer to Recommended practice for 9-5/8" Redrill-Sidetrack Version 3.2
Pre-Rig Work:
1. R/U E-Line and RIH to make a chemical cut inside of 3.5" tbg as close to TIW
Assembly as possible which is located at 10139' MD. However, the cut must be
below 8450' MD. R/D E-Line Unit. ( KOP will be at 8200' MD )
2. Circulate SW down tbg and up the inside annulus. F/P top 2500' MD.
3. Set TVVC. Test it to 1000 psi from the above. ( Do not lock open TRSSSV )
Remove the well house and flowlines. If necessary, level the pad and dig out the
cellar. Please provide total well preparation cost on the handover form.
,
Rig-Work:
1. Move in drilling rig.
2. Pull TWC. Circulate diesel freeze ' protection cap from well and recover for
future use.
,
Install a BPV and test tree plug. Remove the production tree. ( Prior to
removing the tree please make sure that the BPV was tested to 1000 psi
since it counts as a barrier only if it is tested from the 'below', In addition to
that please make sure that TRSSSV is closed as it is going to be our second
barrier while N/D tree and N/U BOPs.
4. Install BOP's and test to 5000 psi. Remove the test plug and BPV.
5. Pull and lay down the 3-1/2" tubing from the cut to surface. Inspect for NORM
prior to moving off the location.
,
P/U EZSV and RIH P/U 4.5" DP. Set it at 8450' MD (~. 250' below proposed 9-
5/8 section ) Down Squeeze cement to plug the existing well.
Pump cement slurry as follows:
RE¢£1V£D
a, 1168' of 4,5" Liner = 32 bbls
b, 7" Casing (200') = 8 bbls
c. Squeeze away = 30 bbls APR 1 2 1995
Total = 70 bbls ~st~ 0il & Gas Cons. Commission
Nlch0ra~ ~
Note:The objective is to pump enough volume to fill slotted liner, to squeeze
away 30 bbls and to bring cement 200' above the top of slotted liner and inside
of 7" casing. ( AOGCC requires to bring it up at least 100' above top perf )
Page 3
After unstinging from the EZSV spot 18 ppg pill up to the base of proposed 9-5/8
section. POOH.
7. P/U Section mill and RIH to 8200' MD. Cut 45' section. POOH.
10.
11.
,
,
12.
13.
14.
15.
16.
17.
18.
RIH with open ended 4.5" DP and spot a balanced cement kick-off plug (180
cubic feet minimum) through open-ended drillpipe from 100' below the base of
the section to - 200' above the top of the section.
Run in with an 8-1/2" steerable drilling assembly and dress the cement to 5'
below the section top. Prior to kickoff circulate hole clean so that it is free of
cement. Kickoff and directionally drill to the target at 8675 TVDss and 90°
useing GR / MWD only.. Obtain GR / NEU / Sonic formation evaluation logs
via DP Conveyed method starting from the top of Put River to TD.
Run a 7" 29 # L-80 liner assembly to bottom in the 8-1/2" hole and space the
liner hanger (L-80) and top isolation packer (L-80) about 150' up inside the 9-
5/8" casing. Refer to Standard recommended practices for liner running
procedure.
Cement the liner in place with the total cement volume based upon 50 %
open-hole enlargement plus the 80' shoe volume, 150' lap volume and 150'
excess on top of the liner with drillpipe in the hole. ( Note: if the caliper log is
available use it and add 20% to caliper volume ). Set liner hanger / packer
with 4200 psi. Reverse out clean.
Re-test BOP's as needed.
Run in with 6'-- steerable drilling assembly with GR / MWD on 4-1/2" x 3-1/2"
drillpipe. Test casing to 3500 psi for 15 min. before drilling out float shoe and
10' of new hole.
Displace well with non-damaging (FIo-Pro Xanvis polymer) drilling fluid.
Drill approximately 500' of 6" hole to TD as per Geologist on site.
Make a conditioning trip with a 6" hole-opener for the open hole section with a
7" casing scraper spaced to clean the liner. ( This may not be necessary )
Install a 4-1/2" NT-80S slotted liner with 4-1/2" X 7" packer / hanger. Run in
on drillpipe with a 2-1/16" wash string inside the slotted liner. Space packer /
hanger to be set within about 150' of the 7" liner shoe.
Position packer above the 7" liner shoe and circulate. Set packer and test.
Release from the packer / hanger and displace the drilling fluid with filtered
seawater but no corrosion inhibitor. After circulating clean with seawater, spot
a Xanvis mud breaker in the horizontal hole section. ~ F,. ~ E ~ F,. ~)
N~ ~i{ .& Gas Cons. Commissio~bag¢ 4
19.
20.
21.
22.
23.
24.
25.
26.
Pull the wash string up just above the hanger and circulate out Xanvis mud
above the slotted liner with filtered seawater. Pull out of the hole and lay
down the wash string.
Run the 4-1/2" L-80 completion string assembly. Space out and circulate
with corrosion inhibitor before setting the tubing packer.
Install a BPV and test plug. Remove BOP's.
Install and test the production tree to 5000 psi. Pull tree test plug and BPV.
Test the tubing x casing annulus to 3500 psi for 30 minutes.
Shear RP valve in the upper GLM and freeze protect the well.
Set a BPV. Release rig.
Complete appropriate documentation and hand-over to Production
RECEIVED
APR 1 2 199,5
Oil & Gas Cons. Commission
Anch0ra ~,
Page 5
d6-1995 08:03 FROM ANADRILL TO PBD ENGINEERS P.05
· I m i I II I,
I SHAREB 'SERVICES' BRZLLING !
DS I8-'15A (P.O 3)
VERTICAL SECTION VIEW
II I III
' Section at' ~48.63
: TVD Scale.' 1 inch = 300 feet
7~00-- Oep Scale.' ~.inch = 300 feet
~ " I O~awn ' 04/06/95
, ~ Sch]umDerger
7400-- ~ _ I Marker Identification MO BKB SECTN INCLN
~ A) TIE-IN SUBVET 8065 7725 it2B ~0.90
~ ~ B) TOP OF WINDOW 8t95 7822 ~189 ~.96
~ ~ C) KOP / CuRvE 6/100' 8200 7826 ~191 ~2 O0
7550 '
..... ~ ....... O) END OF 6/~00 ~V~l 8530 8097 ~349 ~8.49
J 's, E) START t3/Joo CRvl8 8774 8311 1460 28.49
'.~, . F) START 3/~00 C~W3 88a8 8378 149J 22.1.4
7700~_ ~.... G) START 13/~00 ~v~4 894~ 8~63 1528 24.92
l-- , , H) ....... TARGET ....... 9442 8718 19~8 90.~0
I) END ~3/t00 CRV~4 9442 87~8 1928 . go.o0
J) TD ' 9942 8718 2428 90.00
'z~ ~ - ~ .........
· ~
I
m I m
. I
, , ~PR 5 1995
600i 750 900 · 1050 1200 1350' 1500 1650 1800 1950 2100 2250' 2400 2550 2700
S tigon D .
~ ~~ . ec. . eparture ....
~6-1995 88:84 FROM,_~ANADRILL TO _,. PBD ENGINEERS P.O?
i ' ' i
i I i II II ' III
i
i OSI8- A (PO ) :
i PLAN VlE : ·
;
CLOSUFE ' 28~8 feet at Azimuth 116.,80
OECLIN~TION.' 29.472 E : ~
Marker Identification
A) TIE-IN SURVEY
B) TOP OF WINDON
C) KOP / CURVE
D) END OF 6/100 CRV#I'
E) START 13/~00 CRV#2
FJ START 3/100
G] START 13/100 C~v~4.
SCALE ~ ' :~ inch = 200 feet,
DRAWN, i .....: 04/06/95 i
I :
I
~= ,/~nadr i t ]
I
Sch]umb..e~ge~
H) ....... TARGET ..... ~-
I) END $3/100 CRV¢4 '
J) TO
A
:
ND N/S
8065 283
8J95 303
8200 304
8530 388
8774 465
8848 489
8941 520
9~42 862
9442 862
9942 1289
1702
1786
1789
1956
2043
2063
8082
2292
2555
PR 5 ! '/995
100 ?T TAHGE1 RADIUS
t.500 160o . 1700 1800 i900 8000
EAST 7~ ~-~. . '
,
f~-i,l~. (c)73 ;[~'*~.~3 82.52' 8:;3~ :~ ~): ~ · :~ .
~.....' ;. , . .; ~.'-. ..... ..,:.~:,;'~.: · .~ : ,..., ~
. .. .. . . ' .:....?. ~ · .. '; ~:. : ::.
2100
2200 ·
.
..
2300 ~400 2500 2600
~ T'-.
·
2;'00
~800
STATE OF ALASKA
At.~,,Sr,,A OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon x Suspend __ Operation Shutdown__ Re-enter suspended well __
Alter casing __ Repair well __ Plugging X Time extension __ Stimulate __
Change approved program__ Pull tubing , Variance __ Perforate __ Other
Plugback for redrill
2. Name of Operator
ARCO Alaska, Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development. x
Exploratory __
Stratigraphic .__
Service .__
4. Location of well at surface
813' SNL, 311' EWL, SEC. 19, T11N, R15E
At top of productive interval
1365' SNL, 2800' EWL, SEC. 19, T11N, R15E
At effective depth
1878'SNL, 4691' EWL, SEC. 19, T11N, R15E
At total depth
1898' SNL, 4760' EWL, SEC. 19, T11N, R15E
RECEIVED
MAR 28 1995
Alaska 0il & Gas Cons, C0mmisslon
Annhorr. -~
12. Present well condition summary
Total depth: measured
true vertical
11230 feet
8730 feet
Plugs (measured)
6. Datum elevation (DF or KB)
KBE = 48' feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
18-15
9. Permit number
87-98
10. APl number
50- 029-21755
11. Field/Pool
Prudhoe Bay Field/Oil Pool
Effective depth: measured
true vertical
11158 feet Junk (measured)
8724 feet
Casing Length
Structural
Conductor 80'
Surface 2646'
Intermediate
P roductio n 1708'
Liner 1008'
Size Cemented
20" 1680 # Po/eset
13-3/8" 2500 sx CS III &
550 sx CS II
7" 625 sx Class "G"
4-1/2"
Measured depth
110'
2686'
8577L10285'
10160Ll1168'
True vertical depth
110'
2686'
8089'-8667'
8672'-8736'
Perforation depth: measured Slotted liner 10285'- 11158'
true vertical Slotted liner 8676;8736
Tubing (size, grade, and measured depth) 3-1/2", N-80 PCT tubing to 10151'MD
Packers and SSSV (type and measured depth) 7" TIW SS packer @ 10151' MD; 3-1/2" Otis FM-8 SSSV @ 2160' MD
13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch
14. Estimated date for commencing operation
4/10/95
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil x Gas
Suspended
Service
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ¢,~/~ Title DrillingEngineerSupervisor
FOR COMMISSION USE ONLY
Conditions of approvat:-'Notify Commission so representative may witness
Date
Plug integrity ,,-'-' BOP Test__
Mechanical Integrity Test __
Approved by order of the Commission
Location clearance
Subsequent form required 10- /-/0'7
J Approval No. ¢~'-..- 0¢ "~
Commissioner Date
Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE
WELL PERMIT CHECKLIST
, ,OOL
COMPANY
WELL NAME
GEOL AREA
UNIT#
PROGRAM: exp [] dev [] redrll~ aery []
IIG <
ADMINISTRATION
ENGINEERING
GEOLOGY
1. Permit fee attached ..................
2. Lease number appropriate ...............
3. Unique well name and number ..............
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundary.
6. Well located proper distance from other wells .....
'7. Sufficient acreage available in drilling unit .....
8. If deviated, is wellbore plat included ........
9. Operator only affected party ..............
10. Operator has appropriate bond in force ........
11. Permit can be issued without conservation order ....
12. Permit can be issued without administrative approval.
13. Can permit be approved before 15-day wait .......
N
N
N
N
N
N
N
N
N
N
N
14. Conductor string provided ................ Y N2
15. Surface casing protects all known USDWs ......... Y N
16. CMT vol adequate to circulate on conductor & surf csg.. Y N
17. CMT vol adequate to tie-in long string to surf csg . . . Y N
18. CMT will cover all known productive horizons ....... Y
19. Casing designs adequate for C, T, B & permafrost .... ~ N
20. Adequate tankage or reserve pit ............
21. If a re-drill, has a 10-403 for abndnmnt been approved.
22. Adequate wellbore separation proposed ..........
23. If diverter required, is it adequate ........... Y N
24. Drilling fluid program schematic & equip list adequate ~ N
25. BOPEs adequate ..................... ~ N
26. BOPE press rating adequate; test to ~--~ psig.~ N
27. Choke manifold complies w/API RP-53 (May 84) .......
Work will occur without operation shutdown ....... ~ N
28.
29. Is presence of H2S gas probable ............ ~ N
30. Permit can be issued w/o hydrogen sulfide measures .... Y ~/
31. Data presented on potential overpressure zones ..... Y/N /~/ ~
32. Seismic analysis 9f shallow gas zones .......... t N/ ~/ ~ ~ t/ ~
33. Seabed condition survey (if off-shore) ........ / Y N
34. Contact name/phone for weekly progress reports . . . / . Y N
[exploratory only] ~
GEOLOGY: ENGINEERING:
COMMISSION:
Comments/Instructions:
'"~lcheklist rev 03/94
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Tape Subfile 2 is type: L~
TAPE HEADER
PRUDHOE BaY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
MWD RUN 1
JOB NUMBER: AK- MW- 50040
LOGGING ENGINEER: R. FRENCH
OPERATOR WITNESS: S. WALLS
SURFACE LOCATION
SECTION:
TOWNSHIP:
PJkNGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
OPEN HOLE
U.S. 18-15A PB1
500292175570
ARCO ALASKA, INC.
SPERRY-SUN DRILLING SERVICES
25-0CT-96
19
liN
1SE
4466
4642
47.90
46.50
17.50
M CROE LMED
CASING DRILLERS
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 8175.0
8 . 500 7 . 000 9546 . 0
6.000 10110.0
MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WELL 18-15A PB1 IS REPRESENTED BY RUN 1.
RUN 1 IS DIRECTIONAL WITH GAMMA RAY (SGRD) .
GAMMA RAY DATA ACQUIRED WITH NATURAL GAMMA PROBE,
SCINTILLATION TYPE DETECTOR, AND IS DENOTED AS
NGP/SGRD.
ALL GAMMA RAY DATA WAS DOWNHOLE RECORDED.
WELL 18-15A PB1 KICKED-OFF FROM WELL 18-15 THROUGH
A WINDOW IN THE 9 5/8" CASING FROM 8175' TO 8225'.
WELL 18-15A PB1 WAS DRILLED TO TD AT 8646' WHERE LOST
RETURNS WERE ENCOUNTERED AND THE WELL WAS PLUGGED
BACK TO THE WINDOW.
WELL 18-15A PB1 DATA HAS BEEN DEPTH SHIFTED.~.,,~~ ~~-L,~.~' t h~
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 8116.0
$
BASELINE CURVE FOR SHIFTS: UNKNOWN
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
8115.5
8142.5
8149.5
8648.5
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
REMARKS:
GR
8112.5
8139.5
8147.0
8646.0
STOP DEPTH
8583.0
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP
1 8175.0
MERGED MAIN PASS.
MERGE BASE
8646.0
CN
WN
FN
COUN
STAT
/? ?SHIFT. OUT
$
: ARCO ALASKA, INC.
: D.S. 18-15A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 15
Tape File Start Depth = 8670.000000
Tape File End Depth = 8050.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
3724 datums
Tape Subfile: 2
105 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 8113.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUMANGLE:
STOP DEPTH
8580.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
08-MAY-95
MSC 1.32
DEP 2.041
MEMORY
8646.0
8175.0
8646.0
0
29.7
34.7
TOOL NUMBER
NGP 147
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
8.500
8175.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MI/O VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL POLYMER
10.00
48.0
10.7
32000
5.6
.000
.000
.000
.000
.0
137.5
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 1.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 18-15A PB1
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
.2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 14
Tape File Start Depth = 8670.000000
Tape File End Depth = 8100.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 3424 datums
Tape Subfile: 3 77 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is type: LIS
01
**** REEL TRAILER ****
96/ 0/25
01
Tape Subfile: 4 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Fri 25 OCT 96 12:54p
Elapsed execution time = 0.60 seconds.
SYSTEM RETURN CODE = 0
Tape Subfile 2 is type: LI~
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MW- 50040
R. FRENCH
S. WALLS
P.S. 18-15A
500292175501
ARCO ALASKA, INC.
SPERRY-SUN DRILLING SERVICES
25-OCT-96
MWD RUN 2
R. FRENCH
S. WALLS
MWD RUN 3
R. FRENCH
S. WALLS
MWD RUN 4
JOB NI/MBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
R. FRENCH
S. WALLS
MWD RUN 5
R. FRENCH
G. BECK
19
liN
15E
4 7 . 9 oDme
46.5O
17.50
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING 9.625 8175.0
3RD STRING 8.500 7.000 9546.0
PRODUCTION STRING 6.000 10110.0
REMARKS:
MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
WELL 18-15A IS REPRESENTED BY RUNS 1-5.
RUNS 1-5 ARE DIRECTIONAL WITH GAMMA RAY (SGRD) .
GAMMA RAY DATA ACQUIRED WITH NATURAL GAMMA PROBE,
SCINTILLATION TYPE DETECTOR, AND IS DENOTED AS
NGP/SGRD.
GAMMA RAY WAS LOGGED IN CASING FROM 9486' TO 9547'.
ALL GAMMA RAY DATA WAS DOWNHOLE RECORDED.
WELL 18-15A IS KICKED OFF FROM WELL 18-15 THROUGH A
WINDOW IN THE 9 5/8" CASING FROM 8175' TO 8225'.
WELL 18-15A WAS SIDETRACKED FROM WELL 18-15A PB1 AT
8180', PART WAY THROUGH RUN 1.
WELL 18-15A HAS BEEN DEPTH SHIFTED.
WELL 18-15A WAS DRILLED TO TD AT 10110'.
I';".S',/ 0 4 1996
Oil Gas ' ' '
'~ Cotis. uol~rlll¢$,to~
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves;
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 8115.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
all bit runs merged.
BASELINE DEPTH GR
8142.5 8139.5
8149.5 8147.0
8210.0 8210.0
8212.0 8212.0
8217.0 8217.0
8220.0 8220.5
8237.5 8237.5
8244.0 8243.5
8252.0 8251.5
8260.5 8260.0
8295.0 8294.5
8296.5 8296.0
8310.5 8310.0
8331.5 8330.5
8333.5 8333.0
8352.5 8351.5
8353.5 8353.0
8354 . 5 8354 . 0
8371.5 8370.5
8374.5 8373.5
8393.0 8392.5
8406.0 8406.0
8407.0 8407.5
8416.0 8416.5
8419.5 8420.0
8422.5 8423.0
8430.5 8430.0
8436.5 8436.5
8448.5 8449.0
8451.0 8451.5
8457.0 8456.5
8458.0 8457.5
8459.0 8459.0
8460.5 8460.0
8481.5 8480.5
8502.5 8501.5
8512.5 8511.5
8522.0 8521.5
8525.0 8524.0
8544.0 8543.0
8561.5 8560.5
8574.0 8571.5
8594.0 8592.5
8610.5 8608.5
STOP DEPTH
10054.0
(WALS, Open Hole, 14-May-95.)
EQUIVALENT UNSHIFTED DEPTH
8642 .5
8653 .5
8658.0
8695.5
8697.0
8698.0
8702.0
8723 .0
8728.5
8730.0
8733 .5
8735.0
8738.5
8740.0
8756.5
8776.5
8778.0
8785.5
8788.5
8805.5
8806.5
8808.5
8848.0
8858.0
8861.0
8874.5
8892.0
8906.5
8913 .5
8927.5
8960.0
9039.0
9040.0
9078.5
9098.0
9121.5
9190.5
9282.5
9287.5
9288.5
9305.0
9312.0
9425.5
9434.0
9445.0
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
8643. ~
8653 . 0
8657.5
8695.5
8697.0
8698.0
8702.5
8721.0
8726.5
8728.0
8731.5
8732.5
8736.5
8738.0
8754.0
8774.5
8776.0
8784.0
8787.0
8803.5
8804.5
88O7.0
8850.0
8858.5
8862.0
8876.0
8893.0
8907.5
8914.5
8928.5
8957.5
9041.0
9042.0
9079.0
9098.5
9122.5
9192.0
9281.5
9287.0
9288.0
9303.5
9311.5
9428.0
9435.5
9447.0
BIT RUN NO
1
2
3
4
5
MERGED MAIN PASS.
MERGE TOP
8175.0
8180.0
8896.0
9022.0
9547.0
MERGE BASE
8180.0
8896.0
9022.0
9547.0
10110.0
/??SHIFT.OUT
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 51
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
Tape File Start Depth = 10150.000000
Tape File End Depth = 8050.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
12604 datums
Tape Subfile: 2
236 records...
Minimum record length:
Maximum record length:
18 bytes
1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
P~AW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 8113.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIM UMANGLE:
STOP DEPTH
8180.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS: MWD RUN 1.
08-MAY-95
MSC 1.32
DEP 2.041
MEMORY
8180.0
8175.0
8180.0
0
29.7
34.7
TOOL NUMBER
NGP 147
8.500
8175.0
KCL POLYMER
10.00
48.0
10.7
32000
5.6
.000
.000
.000
.000
.0
137.5
.0
.0
.00
.000
.0
0
CN
WN
FN
COUN
STAT
DATA ABOVE 8z/5' KICK-OFF POINT IS FROMm_8-15 BOREHOLE.
DATA BELOW 8180' KICK-OFF POINT IS FROM 18-15A PB1
BOREHOLE.
$
: ARCO ALASKA, INC.
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 8185.000000
Tape File End Depth = 8050.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
814 datums
Tape Subfile: 3
70 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 2
DEPTH INCREMENT: .5000
FILE SIIMMARY
VENDOR TOOL CODE START DEPTH
GR 8116.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOW-NHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
8830.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
12 -MAY- 95
MSC 1.32
DEP 2.041
MEMORY
8896.0
8180.0
8896.0
0
36.1
39.6
TOOL NUMBER
NGP 147
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
8.500
8175.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL POLYMER
9.90
48.0
9.5
28000
5.6
.000
.000
.000
.000
.0
141.6
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 2.
DATA ABOVE b~?5' KICK-OFF POINT IS FROMm±8-15 BOREHOLE.
CN
WN
FN
COUN
STAT
BOREHOLE.
: ARCO ALASKA, INC.
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 19
Tape File Start Depth = 8900.000000
Tape File End Depth = 8110.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 17348 datums
Tape Subfile: 4 85 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NLIMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 8831.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXI~ ANGLE:
STOP DEPTH
8955.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
13 -MAY- 95
MSC 1.32
DEP 2.041
MEMORY
9022.0
8896.0
9022.0
0
36.0
36.8
TOOL NUMBER
NGP 147
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
8.500
8175.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MI/O PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL POLYMER
9.90
50.0
9.7
27000
6.1
.000
.000
.000
.000
.0
137.5
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 3.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 5
Tape File Start Depth = 9030.000000
Tape File End Depth = 8825.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 2048 datums
Tape Subfile: 5 68 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NIIMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 8952.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMIIMANGLE:
STOP DEPTH
9486.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
14-MAY-95
MSC 1.32
DEP 2.041
MEMORY
9547.0
9022.0
9547.0
0
37.0
86.1
TOOL NUMBER
NGP 147
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
8.500
8175.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
KCL POLYMER
10.10
55.0
9.5
28000
6.4
.000
.000
.000
.000
.0
141.6
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 4.
CN
WN
FN
COUN
STAT
: ARCO ALASKA, INC.
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 15
Tape File Start Depth = 9550.000000
Tape File End Depth = 8945.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 20982 datums
Tape Subfile: 6 78 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9367.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10055.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
18-MAY-95
MSC 1.32
DEP 2.041
MEMORY
10110.0
9547.0
10110.0
0
84.1
91.3
TOOL NUMBER
NGP 147
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.000
9546.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
ICL FLO-PRO
9.00
55.0
9.5
42000
6.0
.000
.000
.000
.000
.0
129.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 5.
CN
WN
FN
COUN
STAT
ARCO ALASKA, INC.
D.S. 18-15A
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 19
Tape File Start Depth = 10150.000000
Tape File End Depth = 9360.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
6792 datums
Tape Subfile: 7
82 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 8 is type: LIS
96/10/25
01
**** REEL TRAILER ****
96/10/25
01
Tape Subfile: 8 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Fri 25 OCT 96 l:05p
Elapsed execution time = 1.20 seconds.
SYSTEM RETURN CODE = 0
ARCO ALASKA INC
D.S. 18-15A ~c~lv~o
MAY 2 2 1995
PRUDHOE~ oB~y~,~,°.
MICROFiLmED
Run 1-
14- MAY- 1995
ACICNIGR
WESTERN
ATLAS
Logging Services
Tape Subfile 2 is type, ~IS
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
RUN 1
6430.00
B. ESARY
WALLS / STEARN
D.S. 18 - 15A
500292175501
ARCO ALASKA INCORPORATED
WESTERN ATLAS LOGGING SERVICES
18-MAY-95
RUN 2 RUN 3
19
liN
15E
813
311
47.90
46.50
17.50
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
lST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS: AC/CN/GR.
9.625 8175.0
8.500 9547.0
PIPE CONVEYED LOGGING.
CIRCULATION STOPPED AT 0430, 14-MAY-95.
BOTH UP AND DOWN PASSES ARE INCLUDED AS RAW DATA
FILES.
NOTE SPIKES ON MAIN PASS AT 9245, 9341, & 9433 DUE
TO PCL OPERATION.
NEUTRON LOG PARAMETERS:
SANDSTONE MATRIX,
BOREHOLE CORRECTION = 8.500"
CHISM FILTERING IS ACTIVE,
CASING CORRECTIONS OFF,
SALINITY = 0.00 PPM.
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings; depth shifted and clipped curves;
hole data.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 8177.0 9500.0
BCS 8177.0 9535.0
2435 8177.0 9500.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH DT
8175.0 8175.0
8208.5 8208.0
8215.5 8215.0
8217.0 8218.0
8218.5
8225.0 8226.0
8236.0 8237.0
8237.0
8243.5 8244.0
8246.0 8246.0
8262.0
8281.5
8293.5 8293.5
8296.5
8300.0
8312.0
8330.5
8331.5 8332.0
8354.5
8355.0 8355.0
8365.0 8365.0
8373.0 8373.5
8395.0 8395.5
8418.0
8436.5
8448.5
8457.5 8458.5
8492.5
8507.5 8508.0
8523.5 8523.5
8596.5 8596.5
8636.0 8636.0
8656.5 8657.0
8696.0
8706.0 8707.0
8719.5
8762.5 8763.0
8769.5
8770.5 8771.5
8785.5 8786.5
8786.5
EQUIVALENT UNSHIFTED DEPTH
NPHI
8175.0
8218.5
8237.5
8262.0
8281.5
8297.0
8300.0
8311.0
8330.5
8354.5
8365.0
8418.5
8437.0
8449.0
8458.5
8492.0
8508.0
8523.5
8596.5
8636.0
8696.0
8719.5
8769.5
8787.0
all runs merged;
·
no case
8807.0
8849.0
8875.0
8893.5
8905.0
8905.5
8914.5
8915.0
8926.5
8962.5
9011.5
9040.5
9084.5
9118.0
9142.0
9142.5
9189.0
9229.0
9267.5
9278.5
9279.0
9290.5
9311.0
9315.5
9325.5
9358.0
9377.0
9428.5
9442.5
9476.5
9540.0
$
MERGED DATA SOURCE
PBU TOOL CODE
GR
BCS
2435
$
REMARKS:
. J7.5
8848.5
8874.5
8895.0
8905.0
8916.0
8927.5
8963.0
9040.5
9118.0
8807.5
8874.5
8895.0
8905.5
8915.0
9011.5
9040.5
9084.5
9140.5
9142.0
9189.0 9189.5
9228.0 9228.0
9268.0
9281.0
9278.5
9291.0 9291.0
9312.0 9312.0
9315.5
9325.5 9325.5
9358.5 9358.5
9377.0 9377.0
9429.0 9429.0
9444.0 9444.0
9477.0 9477.0
9540.0 9540.0
RUN NO. PASS NO. MERGE TOP
1 4 8177.0
1 4 8177.0
1 4 8177.0
MAIN PASS.
MTEM, TEND, & TENS WERE SHIFTED WITH DT.
FUCT & NUCT WERE SHIFTED WITH NPHI.
MERGE BASE
9500.0
9535.0
9500.0
/ ? ?MATCH1. OUT
/ ? ?MATCH2. OUT
$
CN : ARCO ALASKA INC
WN : D.S. 18-15A
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
8 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
GR BCS 68 1 GAPI
DT BCS 68 1 US/F
MTEM BCS 68 1 DEGF
TEND BCS 68 1 LB
TENS BCS 68 1 LB
NPHI 2435 68 1 PU-S
FUCT 2435 68 1 CPS
NUCT 2435 68 1 CPS
4 4 57 310 01 1
4 4 57 530 16 1
4 4 57 995 99 1
4 4 57 995 99 1
4 4 57 995 99 1
4 4 43 995 99 1
4 4 43 995 99 1
4 4 43 995 99 1
32
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 98
Tape File Start Depth = 8177.000000
Tape File End Depth = 9535.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 24454 datums
Tape Subfile: 2 265 records...
Minimum record length: 42 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUMBER: 4
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GRCH
NPHI
$
.5000
START DEPTH STOP DEPTH
8150.0 8177.0
8150.0 8177.0
BASELINE CURVE FOR SHIFTS: GRCH
CURVE SHIFT DATA (MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH
$
REMARKS: CASED HOLE PORTION OF MAIN PASS.
THE INTERVAL WAS TOO SHORT TO DO ANY DEPTH
MATCHES.
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
6 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH 2435 68 1 GAPI 4
2 NPHI 2435 68 1 PU-S 4
3 FUCT 2435 68 1 CPS 4
4 NUCT 2435 68 1 CPS 4
5 TEND 2435 68 1 LB 4
6 TENS 2435 68 1 LB 4
4 43 310 01 1
4 43 890 01 1
4 43 334 31 1
4 43 334 30 1
4 43 635 99 1
4 43 635 99 1
24
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 2
Tape File Start Depth = 8150.000000
Tape File End Depth = 8177.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
Tape Subfile: 3
Minimum record length:
Maximum record length:
386 datums
32 records...
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
1
4
.2500
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 8150.0 9502.0
AC 8150.0 9538.0
2435 8150.0 9509.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
14-MAY-95
FSYS REV. J001 VER. 1.1
430 14-MAY-95
2020 14-MAY-95
9547.0
9546.0
8150.0
9539.0
1200.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWVL
CHT
TEMP
GR
CN
KNJT
PCM
KNJT
AC
$
SWIVEL
CABLEHEAD TENSION
TEMPERATURE
GAMMARAY
COMPENSATED NEUTRON
KNUCKLE JOINT
PULSE CODE MODULATOR
KNUCKLE JOINT
BHC ACOUSTILOG
TOOL NUMBER
3944XA
3974XA
2806XA
1309XA
2435XA
3921NA
3506XA
3921NA
1609EA/1603MA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
8.500
8175.0
.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
KCL POLYMER
10.10
55.0
9.5
5.2
168.4
1.880
68.2
MUD AT BOTTOM ~OLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: MAIN UP PASS.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
.810
1.880
.000
2.550
.000
THERMAL
SANDSTONE
.00
8.500
.0
168.4
68.2
.0
68.2
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
11 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR AC 68 1 GAPI 4
2 AC AC 68 1 US/F 4
3 TEMP AC 68 1 DEGF 4
4 CHT AC 68 1 LB 4
5 TTEN AC 68 1 LB 4
6 SPD AC 68 1 F/MN 4
7 CNC 2435 68 1 PU-S 4
8 CNCF 2435 68 1 PU-S 4
9 CN 2435 68 1 PU-L 4
10 LSN 2435 68 1 CPS 4
11 SSN 2435 68 1 CPS 4
4 60 310 01 1
4 60 520 99 1
4 60 660 99 1
4 60 635 99 1
4 60 635 99 1
4 60 636 99 1
4 43 995 99 1
4 43 995 99 1
4 43 890 01 1
4 43 334 31 1
4 43 334 30 1
44
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 265
Tape File Start Depth = 8150.000000
Tape File End Depth = 9538.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 91091 datums
Tape Subfile: 4 343 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
FILE HEADER
FILE NUMBER: 4
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
1
2
.2500
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9145.0 9502.5
AC 9180.0 9538.5
2435 9152.0 9509.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
14-MAY-95
FSYS REV. J001 VER. 1.1
430 14-MAY-95
1905 14-MAY-95
9547.0
9546.0
8150.0
9539.0
1200.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWVL
CHT
TEMP
GR
CN
KNJT
PCM
KNJT
AC
$
SWIVEL
CABLEHEAD TENSION
TEMPERATURE
GAMMA RAY
COMPENSATED NEUTRON
KNUCKLE JOINT
PULSE CODE MODULATOR
KNUCKLE JOINT
BHC ACOUSTILOG
TOOL NUMBER
3944XA
3974XA
2806XA
1309XA
2435XA
3921NA
3506XA
3921NA
1609EA/1603MA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
8.500
8175.0
.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
KCL POLYMER
10.10
55.0
9.5
5.2
168.4
1.880
68.2
MUD AT BOTTOM ,.~LE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: REPEAT UP PASS.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
~ 410
1.880
.000
2.550
.000
THERMAL
SANDSTONE
.00
8.500
.0
168,4
68.2
,0
68.2
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
11 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR AC 68 1 GAPI 4
2 AC AC 68 1 US/F 4
3 TEMP AC 68 1 DEGF 4
4 CHT AC 68 1 LB 4
5 TTEN AC 68 1 LB 4
6 SPD AC 68 1 F/MN 4
7 CNC 2435 68 1 PU-S 4
8 CNCF 2435 68 1 PU-S 4
9 CN 2435 68 1 PU-L 4
10 LSN 2435 68 1 CPS 4
11 SSN 2435 68 1 CPS 4
4 60 310 01 1
4 60 520 99 1
4 60 660 99 1
4 60 635 99 1
4 60 635 99 1
4 60 636 99 1
4 43 995 99 1
4 43 995 99 1
4 43 890 01 1
4 43 334 31 1
4 43 334 30 1
44
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 78
Tape File Start Depth = 9546.000000
Tape File End Depth = 9138.500000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 19959 datums
Tape Subfile: 5 156 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
MUD AT BOTTOM ._JLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: MAIN DOWN PASS.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
.810
1.880
.000
2.550
.000
THERMAL
SANDSTONE
.00
8.500
.0
168.4
68.2
.0
68.2
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
11 Curves:
Name Tool Code Samples Units
1 GR AC 68 1 GAPI
2 AC AC 68 1 US/F
3 TEMP AC 68 1 DEGF
4 CHT AC 68 1 LB
5 TTEN AC 68 1 LB
6 SPD AC 68 1 F/MN
7 CNC 2435 68 1 PU-S
8 CNCF 2435 68 1 PU-S
9 CN 2435 68 1 PU-L
10 LSN 2435 68 1 CPS
11 SSN 2435 68 1 CPS
Size
4
4
4
4
4
4
4
4
4
4
4
API API API API
Log Crv Crv
Length Typ Typ Cls Mod
4 60 310 01
4 60 520 99
4 60 660 99
4 60 635 99
4 60 635 99
4 60 636 99
4 43 995 99
4 43 995 99
4 43 890 01
4 43 334 31
4 43 334 30
1
1
1
1
1
1
1
1
1
1
1
44
* DATA RECORD (TYPE# 0)
Total Data Records: 277
1014 BYTES *
Tape File Start Depth = 8095.000000
Tape File End Depth = 9549.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 160896 datums
Tape Subfile: 6 355 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 3
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9145.5
AC 9180.5
2435 9150.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
STOP DEPTH
9502.5 ,~
9538.5
9509.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWVL
CHT
TEMP
GR
CN
KNJT
PCM
KNJT
AC
$
SWIVEL
CABLEHEAD TENSION
TEMPERATURE
GAMMA RAY
COMPENSATED NEUTRON
KNUCKLE JOINT
PULSE CODE MODULATOR
KNUCKLE JOINT
BHC ACOUSTILOG
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
14-MAY-95
FSYS REV. J001 VER. 1.1
430 14-MAY-95
1940 14-MAY-95
9547.0
9546.0
8150.0
9539.0
1200.0
TOOL NUMBER
3944XA
3974XA
2806XA
1309XA
2435XA
3921NA
3506XA
3921NA
1609EA/1603MA
8.500
8175.0
.0
KCL POLYMER
10.10
55.0
9.5
5.2
168.4
1.880
68.2
MUD AT BOTTOM ~OLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS:
REPEAT DOWN PASS.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC
: D.S. 18-15A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
o810
1.880
.000
2.550
.000
THERMAL
SANDSTONE
.00
8.5O0
.0
168.4
68.2
.0
68.2
.0
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
11 Curves:
Name Tool Code Samples Units
1 GR AC 68 1 GAPI
2 AC AC 68 1 US/F
3 TEMP AC 68 1 DEGF
4 CHT AC 68 1 LB
5 TTEN AC 68 1 LB
6 SPD AC 68 1 F/MN
7 CNC 2435 68 1 PU-S
8 CNCF 2435 68 1 PU-S
9 CN 2435 68 1 PU-L
10 LSN 2435 68 1 CPS
11 SSN 2435 68 1 CPS
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 60 310 01 1
4 60 520 99 1
4 60 660 99 1
4 60 635 99 1
4 60 635 99 1
4 60 636 99 1
4 43 995 99 1
4 43 995 99 1
4 43 890 01 1
4 43 334 31 1
4 43 334 30 1
44
* DATA RECORD (TYPE# 0)
Total Data Records: 78
1014 BYTES *
Tape File Start Depth = 9132.000000
Tape File End Depth = 9539.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 39508 datums
Tape Subfile: 7 156 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 8 is type: LIS
95/ 5/18
01
**** REEL TRAILER ****
95/ 5/18
01
Tape Subfile: 8 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Thu 18 MAY 95 1:39p
Elapsed execution time = 15.21 seconds.
SYSTEM RETURN CODE = 0