Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-097P LUGG i~?G & L0~%TION REPORT Stats cf Alaska ALA~ 0iL & GA~ CCJNSEKVATION CCMHISSION Review '~he well file, an.~' ¢-~---~n: =n pluqcj/-ng, well head s~a=~s~ ~ !oca~i:n c~~~. ~~e .!oc4 c!e~. c~e. ~_ ' n-~ . r- - Well hea~ c'.~c ~_~: .'"'~a~;,ce_--' po.C er place: Loca:icn Clearance: STATE OF ALASKA ALASKA (..)IL AND GAS CONSERVATION COMMIdSlON WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 195-097 301-282 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22565-01 4. Location of well at surface -~;!~:: ...... 9. Unit or Lease Name 5172' NSL, 1808' WEL, SEC. 19, T11N, R13E, UM~'~ '~'-'"~ 'i Prudhoe Bay Unit At top of productive interval 1268' NSL, 1434' WEL, SEC. 18, T11N, R13E, UM ~,~~! At total depth' - ""'--:.~ ~.~. 10. Well Number 1354' NSL, 492' WEL, SEC. 18, T11N, R13E, UM .?:_ ~,~? U-lEA 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE = 76' ADL 028283 12. Date Spudded 06/27/1995 113' Date T'D' Reached 114' Date C°mp" Susp" °r Aband'07/30/1995 11/1/2001 115' Water depth' if °ffsh°re N/A MSL 116' N°' °f C°mpleti°ns Zero 17. Total Depth (MD+'i'VD) 118. Plug Back Depth (MD+TVD) 119. DEeciional Survey 120. Depth where SSSV set1 21. Thickness of Permafrost 10138 8898 ETI 10052. 8896 F.T.I' []Yes. [] No .I N/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD/LWD, GR, RLL 2'3. 'CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" ;)60 sx Arctic Set (Approx.) 10-3/4" 45.5# NTSOLHE 29' 3036' 13-1/2" ~0 SX CS III, 375 sx 'G', 190 sx CS II 7-5/8" 29.7# 13Cr80/NT95HS 27' 9086' 9-7/8" 265 SX Class 'G' 5-1/2" 17# L-80 8932' 10138' 6-3/4" 260 sx Class'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 8936' 8889' MD TVD MD TVD 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9990' ~et 1st Whipstock 9991 ' P~ with 48.6 Bbls Class 'G'. Sqzd to 1500 psi , 9641' Set 2nd Whipstock 9641' Abandon w/10 Bbls Class 'G' Cement , 27. PRODUCTION TEST Date First Production Method of' Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAs-OIL RATIO i TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA . Brief description of lithology, porosity, fractures, apparent clips and presence of oil, gas or water. Submit core ch~p~;~ I Ata~k~ Oil & Gas C~is. Co'~nmission Anchorage tmr~,! f"~i k ! t~ ! ORIGINAL Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Sag River 9161' 8833' Shublik 9218' 8864' Top Sadlerochit 9275' 8889' ,~i~ska Oil ~ Gu~; ~ons, Con ~ Anch0ra~e 31. List of A~aohments: Summa~ of Daily Drilling Repo~, Summa~ of Pre-Rig Work 32. I hereby oe~i~ Jhat the forgoing i8 true and oorreot Jo ~he best of my knowledge Signed Te,ie H,bb,e ~ . Title Technical Assistant Date 0 l' 1 & U-15A 195-097 301-282 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No./Approval No. iNSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 OV<l GINAL Well: U- 15B Rig Accept: 11/18/01 Field: Prudhoe Bay Unit Rig Spud: 11/28/01 APl: 50-029-22565-02 Rig Release: 12/07/01 Permit: 201-197 Drilling Rig: Nabors 3S PRE-RIG WORK 04/25/01 SET XN CATCHER SUB @ 8908' SLM, PULLED STA.# 1, 3, & MADE TWO A'I-FEMPTS ON STA. # 5 SHUCKED DOGS ON 2ND RUN. LDFN. LEFT WELL SHUT IN. 04/26/01 PULL STA.#5 @ 5109 SLM, & STA #6 @ 3152 SLM. ( STA #5 VALVE WAS BENT AND DIFFICULT TO PULL) NOTE: XN CATCHER SUB STILL IN WELL. LDFN. LEFT WELL SHUT IN. 04/27/01 SET DGLV'S IN STA.#'S 6, 5, 3, HB&R LOADED IA W/CRUDE. SET DGLV IN STA.# i TESTED IA TO 2500 # FOR 30 MINUTES. GOOD TEST. BLED DOWN IA TO 450 #. RIG DOWN HB&R LDFN. CATCHER SUB STILL IN WELL. LEFT WELL SHUT IN. 04/28/01 PULLED CATCHER SUB, DRIFTED TBG. W/3.65" DUMMY WHIPSTOCK 20' LONG, TO 9262' SLM. NO RESTRICTIONS, STOPPED DUE TO DEVIATION. POOH RDMO. LEFT WELL SHUT IN, NOTIFIED PAD OPERATOR OF WELL CONDITIONS, TREE CAP TESTED, ACCUATOR DUMPED. 04/30/01 PRESSURE TEST TUBING AND CASING HANGER FOR CTD PREP. BOTH PASSED TESTS. 08/30/01 MITOA. 10/31/01 MIRU CTU #3. MU 2-3/8" BHA W/3.80" DIAMOND SPEED MILL. KILL WELL WITH 2% KCL WATER. RIH WITH 3,80" MILL (BHA #1). 11/01/01 RIH WITH 3.80" MILL. MILL 'XN' NIPPLE. FLAG PIPE (WHITE) AND CORRECT DEPTH TO 8928' BASED ON MWD AND JEWELRY LOG CORRELATION. RIH TO PBTD (10,051' CORRECTED). FLAG PIPE AT 10,000' (YELLOW). LAY 29 BBLS FLO PRO IN LINER FROM PBTD TO TBG TAIL. PRESSURE UP TO 500 PSIG WHP SEVERAL TIMES. WELL WILL NOT HOLD 500 PSIG TEST - WILL SQZ PERFS. POOH. MAKE UP 2-1/8" MHA AND 5-1/2" BAKER THRU TBG WHIPSTOCK W/SPERRY MEMORY TOOL. GOOD WHIPSTOCK SET AT 9990', SPERRY TOOL NOT WORKING (NO TOOLFACE INFO). POOH, RIH TO SQUEEZE. PUMP 48.6 BBLS CMT, PU TO SAFE DEPTH. HOLD 30 MINUTE SQZ TEST AT 1400 PSI - TOTAL OF 14 BBLS BEHIND PIPE. RIH W/3" BALL DROP NOZZLE TO CLEAN OUT CEMENT. TAG HARD B~-I'M AT 9568' - UNABLE TO JET THRU - (~422' ON TOP OF WHIPSTOCK) POOH. 11102/01 POOH WASHING JEWELRY, WASH TREE. RIH WITH BAKER MOTOR AND 3.80" MILL. SAT DOWN AT 9180'. MILLED CEMENT STRINGERS THROUGH PERF INTERVALS TO 9583'. MILL PERFORMING POORLY - POOH TO CHANGE. FIND DAMAGED AREA ON OUTSIDE OF PIPE AT 5270' - STOP REEL AND PUMP, CALL FOR N2 TRUCK. FP COIL W/MEOH AND FP WELL TO 2500'. BLOWDOWN REEL WITH N2. BEGIN RIG DOWN, ALL EQUIPMENT RELEASED. LEFT WELL SI & FREEZE PROTECTED. 11107/01 BLEED ALL PRESSURES TO 0 PST FOR CTD. ;: i i :-. ,..?' ! BP'EXPLORATION Page 1 Legal Well Name: U-15B Common Well Name: U-15B Spud Date: 11/18/2001 Event Name: RE ENTER Start: 11/17/2001 End: 12/7/2001 Contractor Name: NABORS Rig Release: 12/7/2001 Rig Name: NABORS 3S Rig Number: '~ Date: Fr°m:T°! ~Hours~ctivity Code NPT Phase · Description of Operations 11/18/2001 00:00 - 03:00 3.00 RIGU P PRE MIRU Nabors 3S. 03:00 - 09:00 6.00 RIGU P PRE Accept rig at 0300 hrs 11-18-2001. NU bop's set in backside hardline. 09:00 - 22:00 13.00 RIGU P PRE Test bop's. Notified AOGCC. Witnessing wavied by Chuck Shieve. (DS unit #-4 on location at 0900 hrs. Rig up same. Cut-off 750' coil. Had to rebuild one valve in choke manifold. 22:00 - 22:15 0.25 RIGU P PRE RD cutter 22:15 - 22:37 0.37 RIGU P PRE RU coil connector. 22:37 - 22:45 0.13 RIGU P PRE Pull test coil connector. 22:45 - 23:15 0.50 RIGU P PRE Pull BPV. 23:15 - 23:45 0.50 RIGU P PRE Change packoff 23:45 - 00:00 0.25 RIGU P PRE Pressure test coil connector, inner real valve and hardline. 11/19/2001 00:00 - 01:35 1.58 RIGU P PRE Pressure test MHA 01:35 - 03:45 2.17 STWHIP P WEXIT RIH with cement milling BHA to 9583' first stringers at 9574'. Milling w/1/2# Bio. 03:45 - 09:15 5.50 S'I'WHIP P WEXIT Free spin 1460 psi at 2.5 bpm. 1600-1700 psi on bottom 12-18'/hr. Milled f/9574' to 9606'. Unable to stall motor only 200 psi motor work, might be 09:15 - 11:45 2.50 STWHIP N WEXIT TOH (work on levelwind) 11:45 - 12:15 0.50 S'I-WHIP N WEXIT Cement mills inserts worn down 1/4 of the way. P/U parabolic diamond mill and change out motor. (old motor looked okay). PT MHA 12:15- 14:30 2.25 S'I'WHIP N WEXIT TIH 14:30 - 18:30 4.00 STWHIP N WEXIT Mill cement f/9606'. 2.7/2.7 2000 off bottom 2200 on. 20'/hr slowing tO 10'/hr. Pumping bio sweeps. Mixing 35 pill with 3% lube-tax. Pumping 2 bbl sweeps every 10 mins - helping some. ReP < 10'/hr avg. unbearable! 18:30 - 20:00 1.50 STWHIP N WEXIT TOH 20:00 - 20:15 0.25 S'I-WHIP N WEXIT Change out speed mill for PDC Bit 20:15 - 22:35 2.33 STWHIP N WEXlT RIH to 9634. 22:35 - 00:00 1.42 STWHIP N WEXIT Drilling cement at 2.6bpm 1960 psi. ROP=20ft/hr 11/20/2001 00:00 - 02:30 2.50 S'I'WHIP P WEXlT Drill cement at 9700 2.6 bpm at 1845 psi ReP 14 fi/hr. Sweep every 10' with 5 bbl pill short trip every 20 '. 02:30 - 04:30 2.00 STWHIP P WEXIT Drilling cement at 9770 2.6 bpm at 1783 psi ReP 42 fi/hr short tripping to toc and sweeping hole every 15' with 5bbl pill. I 04:30 - 05:04 0 571 STWHIP P WEXIT Drilling at 9790 at 2.6 bpm at 1780 psi ReP 50+ in perforations last set. 05:04 - 05:30 0.43 S'I-WHIP P WEXIT Flow check pick up 200' shut down pump. Well stable. 05:30 - 13:30 8.00 S'I'WHIP P WEXIT Drill at 9800' at 2.6 bpm with 1854 psi ReP 27-40'/hr. Short trips to TOC every 40'. Pumping 1.5 bbls bio sweeps every 10'. Drill cement to 9972'. No losses noted. 13:30 - 15:20 1.83 STWHIP P WEXIT POOH. 15:20 - 16:00 0.67 S'I'WHIP P WEXIT LD motor and PDC bit. Bit has even wear (gage, shoulder, and even nose cutters). No broken cutters. Same 3.77 gage. MU motor, SM, tapered DSM. 16:00 - 17:30 1.50 S'I'WHIP P WEXIT RIH. Sat down 9630'. 117:30 - 21:20 3.83 S'I'WHIP P WEXIT Mill sheath from 9630' to 9972' at about 100 FPH. ;21:20 - 22:30 1.17 STWHIP P WEXIT Drill cement 2.6 bpm 2874psi ReP 27 from 9972 to 9996.8' to whipstock tray. Pressure increase, ReP decrease here. 22:30 - 23:10 0.67 S'I'WHIP P WEXIT Short trip to 9200'. 23:10 - 00:00 0.83 STWHIPi P WEXIT Mill window @ 2.7 bpm with (3080 psi free spin) 3550 psi 11/21/2001 00:00 - 05:00 5.00 STWHIP P ~WEXIT Mill window 9,997' to 10,000' CTM at 2.7 bpm and 3370 psi ( free spin 3150 psi). WeB 2-8m. At 10,000', saw pressure Printed: 12/10/2001 11:16:53AM - - - .: -- "- BP EXPLORATION Page 2 ~i :- ._ Operations Summa Report Legal Well Name: U-15B Common Well Name: U-15B Spud Date: 11/18/2001 Event Name: RE ENTER Start: 11/17/2001 End: 12/7/2001 Contractor Name: NABORS Rig Release: 12/7/2001 Rig Name: NABORS 3S Rig Number: - Date - From - To Hours_ Activity Code NPT Phase Description of Operations 11/21/2001 00:00 - 05:00 5.00 STWHIP P WEXlT spike and wt fell off. Acting like formation starting here. Drill to 10012'. Ream and backreamwindow. No motorwork. Dry tag clean thru window. Spot pill. 05:00 - 07:00 2.00 STWHIP P WEXlT POH 07:00 - 07:30 0.50 STWHIP P WEXlT LD milling BHA. Normal wear on DSM (3.78" OD). Minimal wear on string mill (3.80" OD). 07:30 o 09:00 1.50 DRILL P PROD1 MU drilling BHA (#5): DS49, 1.1 deg Anadril motor, Sperry MWD, Schl TORC orienter. 09:00 - 11:00 2.00 DRILL P PROD1 RIH. 11:00 - 11:50 0.83 DRILL P PROD1 Log tie-in at 9730' GR. Correct depth (-8'). 11:50 - 12:15 0.42 DRILL P PROD1 RIH with 60L TF. Tag and fell thru 9997'. Tag TD 10006'. 12:15 - 13:15 1.00 DRILL 3 PROD1 Start drilling 2.512875 to 10017'. TF wandered to 135L and did not correct itself back to 60L. Maybe in a bind. PUH above window and check TF. Still at 135L. 13:15 - 14:15 1.00 DRILL 3 PROD1 Clean pits and swap well over to FIo-Pro. Check TORC. OK in continuous rotating mode. Send TF command - good. Must have just lost itself. 14:15 - 15:00 0.75 DRILL ~ PROD1 Drill starting with 30L TF. Shifted to 135L. Drill to 10026'. Seeing 92 deg inc. Stalled and TF shifted to 180. Saw RA at 9999' corrected. Top of whipstock 9990', top of window 9991', bottom of window 9997'. 15:00 - 15:45 0.75 DRILL N DFAL PROD1 PUH above window to reset TF high left. 15:45 - 18:00 2.25 DRILL P PROD1 Drilling slow. Stalls easy, then shifts to 135L. 18:00 - 00:00 6.00 DRILL P PROD1 Drilled slow to 10080 until BHA cleared window. Drill ahead to 10,138' Still experiencing magnatic interferance from old well bore. Shoe of old liner at 10138'.Some reported problem with TORC not holding tool face. 11/22/2001 00:00 - 03:40 3.67 DRILL P PROD1 Directionally drilled to 10224'. Had interference from old well bore until 10170' MD. End of old liner 10138'. Shublik deeper than predicted. At 10224' start experiencing loss at 40 bph. Advised Ted Stagg. Will switch to KCL water as mud inventory decreases. Currently have 179 bbl mud and 600bbl KCL on location. 03:40 - 05:00 1.33 DRILL ~ PROD1 Drill 2.8 bpm 2850 psi ROP 36 ft/hr loss rate .4 bpm 05:00 - 09:00 4.00 DRILL ~ PROD1 Losses steady at 14 BPH. Continue drilling with mud. Looks like we're still in the Shublik or got knocked back into it after crossing a fault. Shoot for 8832' SSTVD (about 15' below plan line). Drill to 10310'. 09:00 - 10:30 1.50 DRILL P PROD1 Wiper to window. Pulled heavyw/o motor work at 10100'. RIH and sat down here with motor work. Ream area. Wiper to 9200' (60 deg). RIH. Slight MW at 10100' shale. 10:30 - 11:30 1.00 DRILL N SFAL PROD1 Dowell software problem. Troubleshoot. Rates, ROPS, 3ressures are all over the place. Nabors pump RPM staying constant, so still able to control TORC orienter. 11:30 - 18:00 6.50 DRILL P PROD1 Drill 10 - 30 FPH to 10318'. Hot shale at 10285' tough to get back down through. Requires RIH dry to get thru. Continue drilling. Losses 10 -20 BPH. Made it to 8832' SSTVD. Still in Shublik. Continue dropping at 87 deg inc. Looks like we got into Z4 at 10380'. Drill to 10430'. 18:00 - 19:15 1.25 DRILL 3 PROD1 Wiper to window.9950 19:15 - 21:15 2.00' DRILL N SFAL PROD1 Trouble shoot and repair mirco motion flow data. Grounding issue caused stray voltage, 21:15 - 23:15 2.00 DRILL ~ PROD1 RIH to 10307 multiple attempts to work thru at 90degrees RT. Printed: 12/10/2001 11:16:53AM ~ i i: ::; ~ i i BP EXPLORATION Page 3~ i : operatiOns summarY Report Legal Well Name: U-15B Common Well Name: U-15B Spud Date: 11/18/2001 Event Name: RE ENTER Start: 11/17/2001 End: 12/7/2001 Contractor Name: NABORS Rig Release: 12/7/2001 Rig Name: NABORS 3S Rig Number: ~,~,Date~il ~: Fromm:TO HoUrs Activity: Code :NPTi; -PhaSe Description of Operations 11/22/2001 21:15 - 23:15 2.00 DRILL P PROD1 RIH to 10430 23:15 - 00:00 0.75 DRILL P PROD1 Directionally drilling at 10,430' 11/23/2001 !00:00 - 03:00 3.00 DRILL P PROD1 Directionally drilling at 2.8bpm 2958 psi (free spin 2750psi) to 10,500'. ROP 30 fph loss rate 16 bpm. Experiencing problems with the DS pump controller. Running pump from the rig floor. 03:00 - 03:30 0.50 DRILL P PROD1 Attempt to go back to conputer control of pump while ; continuing to drill ahead. Drilled to 10508. Need to make tool ;face correction. 03:30 - 04:00 0.50 DRILL P PROD1 Wiper trip to shoe.tight at 10308-10283 pulled 7 over 04:00- 08:15 4.25 DRILL IN SFAL PROD1 Wait on DS Instrument technision to correct DS Pump controller. Could not fix. Will try to use Dowell pump and hope that the noise doesn't affect MWD signal. 08:15 - 08:30 0.25 DRILL P PROD1 RIH with pumps. Sat down at 10305'. PU. RIH dry clean. Hole in pretty good shape. 08:30 - 09:30 1.00 DRILL 3 PROD1 Orient. 09:30 - 09:45 0.25 DRILL 3 PROD1 Currently at 8837' SS'I-VD in Z4. Plan to start bringing it up with right turn. Drill to 10515'. 09:45 - 10:30 0.75 DRILL N SFAL PROD1 Lost control of Dowell pump. Tripped. Pull to window. Fix. RIH. 10:30 - 15:15 4.75 DRILL ~ PROD1 Drill to 10650' 15:15 - 16:15 1.00 DRILL P PROD1 Wiper to window. Overpull and MW in 10520' shale and 10300' shale. Ratty at same spots RIH. 16:15 - 18:00 1.75 DRILL P PROD1 Drill to 10700' 18:00 - 20:45 2.75 DRILL P PROD1 POOH to put on resistivity. 20:45 - 00:00 3.25 DRILL P PROD1 Change out bit, motor, MWD and TORC 11/24/2001 00:00 - 03:00 3.00 DRILL P PROD1 RIH to 9700' 03:00 - 04:40 1.67 DRILL P PROD1 Tie in log. Correct depth (-11'). 04:40- 05:00 0.33 DRILL P PROD1 RIH. 05:00 - 07:30 2.50 DRILL IN DPRB PROD1 Attempt to get thru 10305' shale. Tried multiple TF's. Spot 7% lubetex pill. Finally got it thru. Packed off in choke line a couple of times - shale. 07:30 - 07:45 0.25 DRILL P PROD1 RIH. No other tough spots. Tag TD 11693'. 07:45 - 10:00 2.25 DRILL P PROD1 Cycle pumps to get in fast sampling mode. Log real time resistivity to window at 300 FPH. RIH. Sat down 10080'. 10:00 - 11:00 1.00 DRILL N DPRB PROD1 Work to get thru shale at 10080'. Backream. 11:00 - 11:30 0.50 DRILL 3 PROD1 RIH. Made it thru 10300' shale without too much trouble. 11:30 - 16:30 5.00 DRILL 3 PROD1 Drill. Starting out in more shale, slow drilling. Drill to 10771'. Back in Shublik. Need to plugback. 16:30 - 18:00 1.50 DRILL C PROD1 POOH for plugback. Overpull and motor work starting at 9530' (in horizontal 500' above window). Slow down and keep rate up. Wash to 60 deg. Wash down again. 18:00 - 18:15 0.25 DRILL C PROD1 Log tie-in. Correct depth (+6'). Flag pipe 9500' EOP. 18:15 - 18:30 0.25 DRILL C PROD1 POOH. Overpull, motor work, packed off, stuck in tail pipe 8900'. Work free. POOH. 18:45 - 20:30 1.75 DRILL C PROD1 POH to surface. LD drilling DH^. 20:30 - 21:30 1.00 DRILL C PROD1 Discuss plan forward. Anch reviewing options. 21:30 - 00:00 2.50 DRILL C PROD1 Finish LD BHA and pick up underreamer assembly. 1/25/2001 00:00 - 01:38 1.63 STWHIPiC WEXIT RIH with underreamer top of cement sheath at 9558. 01:38 - 03:00 1.37 STWHIP C WEXIT Change over to water High pump pressure tripping pop-off. 03:00 - 04:00 1.00 S'I'WHIP C WEXIT Mill to 9580 pump sweep. 04:00 - 04:48 0.80 STWHIP C WEXIT Short trip to 9500 OK. 04:48 - 06:45 1.95 S'I'WHIP C WEXIT Underream to 9800', 3250 psi at 2.3 bpm. Losses about 10 BPH with KCL water. Printed: 12/10/2001 11:16:53 AM ~::' :: BP: EXPLORATION Page 4 ~ ~ ~ ~ ~ ~i ,,~ ~i~,oPeratiOnSSUmmary Report Legal Well Name: U-15B Common Well Name: U-15B Spud Date: 11/18/2001 Event Name: RE ENTER Start: 11/17/2001 End: 12/7/2001 Contractor Name: NABORS Rig Release: 12/7/2001 Rig Name: NABORS 3S Rig Number: ~? Date~;~ ~From:~'-To:~ Hours ACtivityCode NPT;~ :PhaSe~ . ~ Description of Operations 11/25/2001 06:45 - 08:30 1.75 STWHIP C WEXlT POOH. Pull heavy in tail pipe again at 8942' and 8928'. Push negative to pop free. 08:30 - 09:30 1.00 STWHIP C WEXlT LD underreamer. Significant wear, but blades still measure 4.75" +. 09:30 o 10:00 0.50 STWHIP C WEXlT Set'rwc. 10:00 - 16:00 6.00 STWHIP C WEXlT Perform weekly BOP test. Witness waived by AOGCC's Lou Grimaldi. 16:00 - 17:30 1.50 STWHIP C WEXlT Pull TWC. Cement on top of plug (from cycling rams). Stab coil and jet top of TWC. Pull TWC. 17:30 - 18:00 0.50 STWHIP C iWEXIT Unload tools. 18:00- 18:30 0.50 STWHIP C WEXlT PJSM and handover. 18:30 - 20:10 1.67 STWHIP C WEXlT Pressure test MHA & PU BHA 20:10 - 22:28 2.30 STWHIP C WEXlT Correct to flag at 9500' PU to 9440. 22:28 - 23:55 1.45 STWHIP C WEXIT Tie in. No correction. 23:55 - 00:00 0.08 STWHIP C WEXlT TORC tool successfully oriented the tool face to high side on start up of the pump. The whipstock held position thru tie-in (straight up).Slight orientation change after setting on depth. Whipstock set 10R. Set whipstock. 11/26/2001 00:00 - 02:00 2.00 STWHIP C WEXlT POH with BHA#8 after setting whipstock. Immediately after changing over to the Nabors pump, plugged the BHA. Pump slow thru coil and well via backside. 02:00 - 03:10 1.17 STWHIP C WEXIT LD BHA FAIV plugged 03:10 - 05:30 2.33 STWHIP X SFAL WEXlT Hydraulic leak in line to chain tensioner. WO mechanic. Fix. 05:30 - 06:30 1.00 STWHIP C WEXlT MU nozzle. 06:30 - 08:30 2.00 STWHIP C WEXlT RIH. correct depth at old flag (+51'). Huge correction???. RIH and tag whipstock pinch point 9645'. Stack 5k. PU overpull. Repeat. No movement. 08:30 - 09:30 1.00 STWHIP C WEXlT PUH 10'. Perform inj test. 1.0 BPM, 940 psi. 1.5 BPM, 1150 3si. 2.0 BPM, 1260 psi. 09:30 - 10:30 1.00 STWHIP C WEXlT RU cementers 10:30 - 11:00 0.50 STWHIP C WEXlT Safety meeting. 11:00 - 12:00 1.00 STWHIP C WEXlT Pump 10 bbls 13.8 ppg. Circulate to nozzle (9636') at 2.8 BPM; 1200 psi CTP. SI backside. Bullhead cement past whipstock 1.9 BPM; 1330 psi WHP. Pressure response with cement at fault. Final squeeze - 0.3 BPM; 1500 psi WHP. Left 4 - 5 bbls of cement above fault. 12:00 - 12:30 0.50 STWHIP C WEXlT Pump bio water. Wash whipstock face clean. 12:30 - 14:30 2.00 STWHIP X STUC WEXlT POOH at 2.7 BPM. Pulled heavy and packed off 8810'. Work pipe in both directions, able to get about 10' of free movement but still packed off with zero returns. Made progress, then lost progress in both directions - all with no returns. Surge well by pressuring-up coil and CT/Tub annulus, then dump the i pressure. Made progress. Gained 50' of movement, still ~packed off. Repeat surging several times, started seeing an ~intermittent trickle at pits, and finally dragged free and got full returns. Because of pack-off, cement is overdisplaced by lots and lots and lots. i14:30 - 16:30 2.00 STWHIP C WEXlT POOH. BU samples showing fine grained shale and cement. 116:30 o 17:30 1.00 STWHIP C WEXlT LD nozzle. MU window milling BHA. (#10) 17:30 - 19:50 2.33 STWHIP C WEXIT RIH to 9577 mill thru bridge. Correct depth at flag (-14'). Mill stringer with 2.3 bpm at 1530 psi from 9605 to pinch point at 9641. Loss rate 6 bph. 19:50 - 00:00 4.17 STWHIP C WEXlT Mill window 9641 to 9644.7 Free Spin 1600psi, Milling at 1800 Printed: 12/10/2001 11:16:53AM Legal Well Name: U-15B Common Well Name: U-15B Spud Date: 11/18/2001 Event Name: RE ENTER Start: 11/17/2001 End: 12/7/2001 Contractor Name: NABORS Rig Release: 12/7/2001 Rig Name: NABORS 3S Rig Number: ;NP% Phase : Description of Operations 11/26/2001 19:50 - 00:00 4.17 S~HIP C WEXIT psi at 2.6 bpm. Loss rate 5-9 bph. 11/2W2001 00:00 - 07:45 7.75 S~HIP C WEXIT Continue milling window with sweeps to 9949'. Drill fo~ation 30 FPH to 9960'. 07:45 - 10:15 2.50 S~HIP C W~IT Ream window. Swap well to FIo-Pro. Check losses - 12 BPH. DW tag 9661' clean. 10:15 - 11:30 1.25 S~HIP X DPRB W~IT Pump 15 bbl LCM pill: 5 ppb OM Seal Fine; 7.5 ppb Safe~rb reed (CaCO3); 7.5 ppb Mix II Fine. Circulate to bit. SI backside and squeeze past whipstock 1.3 BPM; 1100 psi WHP initial and 0.2 BPM; 2000 psi WHP final. Pill passed easily thru motor. Squeezed a total of 10 bbls past whipstock, but must have bridged across whipstock because the lead of the pill was about I bbl sho~ of the fault at final conditions. Wash across whipstock to TD 9660' on choke at 600 psi WHP. Full returns. 11:30 - 13:30 2.00 S~HIP C WEXIT POOH. Pulled heaw and stalled 8810'. Worked free. Pulled heaw and stalled 8710'. WoAed free. POOH. Chasing debris all the way out. Plugged MM. Bypass. Shakers puking large amounts of shale with ~rbolite. 13:30 - 14:00 0.50 S~HIP C WEXIT Safe~ meeting. 14:00 - 14:30 0.50 S~HIP C WEXIT LD milling BHA. Mills in gage, normal wear. Ma~le size chunks of ~ment impregnated with proppant stuck in string mill blades. 14:30 - 16:00 1.50 S~HIP C WEXIT MU drilling BHA. 16:00 - 17:30 1.50 S~HIP X DPRB WEXlT LD drilling BHA. Lots of expensive stuff. Newous about hole ~nditions. Will make another motor/mill run to assess ~nditions. MU motor and diamond whipstock mill. 17:30 - 20:10 2.67 S~HIP X DPRB W~IT RIH. Full pump rate 8500' to TD at 9660' (made -21' ~rrection here). No motor woA, clean RIH weight. 20:10- 20:35 0.42 S~HIP X DPRB W~IT POOH at 3.0 BPM. Flag pipe 9200' EOP. Slight overpull at ~00' - 9390' but no motor woA. OP + MW at 9200'. 20:35 - 21:15 0.67 S~HIP X DPRB W~IT Continue to POOH and saw ove~ull and motor stall at 9204'. Continue to pull up to 8750' (inside the tubing) without any more ove~ull or motor woA. Drop back down to 9500' to wipe the hole again and saw a weight bobble and some motor woA at ~00'. Pick back up on coil from 9500'. Did not see any ove~ull or motor woA at 9390'-9400'. Continue to pull up hole to 9190' and saw motor woA and over pull. Also, cu~ing 3acked off in the micro-motion at sudan. Colle~ed a sample that appeared to be ~ment with a small amount of s~le and shale. 21:15 - 23:00 1.75 S~HIP X DPRB WEXIT Run back down hole to 9217' to wipe the ~sing again. Pick up from 9217' and saw motor woA and overpull from 9217' to 9172'. Run ba~ down hole to 9450' without seeing any motor woA. Pi~ ba~ up hole to 9150' without seeing any motor work or over pull. Circulate boEoms up at 9150' and returns to suda~ were clean. 23:00- 00:00 1.00 S~HIP X DPRB WEXIT POOH with mill and motor. 11/28/2001 00:00 - 01:30 1.50 S~HIP X DPRB W~IT Continue to POOH with diamond mill assy. 01:30 - 02:00 0.50 S~HIP X }PRB W~IT Lay down diamond mill assy. 02:00 - 02:30 0.50 DRILL C PROD1 Make up drilling BHA. 02:30 - 03:30 1.00 DRILL C PROD1 Suda~ test TORC tool. 03:30 - 03:55 0.42 DRILL C PROD1 Repair depth ~unter on injector. 03:55 - 04:30 0.58 DRILL C PROD1 : RIH to 3000' and shallow hole test the MWD, Sperw tools tested ok. However, the pump will not properly send the signal Printed: 12/10/2001 11:16:53AM - - BP EXPLORATION Page 6 _ . - - . _ _- Operations Summary Report - . - Legal Well Name: U-15B Common Well Name: U-15B Spud Date: 11/18/2001 Event Name: RE ENTER Start: 11/17/2001 End: 12/7/2001 Contractor Name: NABORS Rig Release: 12/7/2001 Rig Name: NABORS 3S Rig Number: ' iDate - From - To Hours- Activity -C°de NPT Phase Description of Operations 11/28/2001 03:55 - 04:30 0.58 DRILL C PROD1 to the TORC tool. 04:30 - 05:15 0.75 DRILL X RREP PROD1 Trouble shoot and repair problem with pumps. 05:15 - 05:40 0.42 DRILL C PROD1 Shallow hole test TORC tool. OK. 05:40 - 07:00 1.33 DRILL C PROD1 Continue to RIH with drilling BHA. Correct depth at flag (~15'). 07:00 - 07:30 0.50 DRILL C PROD1 Log tie-in at 9413' GR spike. Correct depth (+12'). 07:30-07:45 0.25 DRILL C PROD1 RIH. Tag 9665'. u/:4~ - lz:uu 4.z~ UI-(ILL L; PROD1 Drill, starting high right. Swap to Nabors pump to disconnect4" - line to install new axle on the rig. Drill to 9850'. Full returns, x,~ 12:00 - 12:15 0.25 DRILL C PROD1 Wiper to window 3.0 BPM. / 12:15 - 16:00 3.75 DRILL C PROD1 Drill with full returns to 10030'. ~ 16:00 - 18:30 2.50 DRILL C PROD1 POOH for resistivity 3.0 BPM; 3000 psi ~ 18:30 - 19:00 0.50 DRILL C PROD1 PJSM prior to pulling BHA to the rig floor. _ J 19:00 - 21:30 2.50 DRILL C PROD1 Pick up Resistivity tool and program on the rig,,0e'or. 21:30 - 22:15 0.75 DRILL C PROD1 RIH with drilling BHA with Sperry resistivity t~l. 22:15 - 22:30 0.25 DRILL C PROD1 Shallow hole test MVVD and orienter. Ok.// 22:30 - 23:30 1.00 DRILL C PROD1 Continue to RIH with drilling BHA. ~ 23:30 - 00:00 0.50 DRILL C PROD1 Tie-in with coil flag. Subtract 12' fro~ coil depth. Tie in to Gamma ray at 9414'. ~ 11/29/2001 00:00 - 00:15 0.25 DRILL C PROD1 Continue tie-in with the gamxm~ ray. Add 8'to coil length. 00:15 - 00:35 0.33 DRILL C PROD1 RIH and tag TD at 10,030~ 00:35 - 03:20 2.75 DRILL C PROD1 Orient tool face to 90 ~Had some difficulties getting signal to the TORC tool duext~the orifice setting in the pulser. Drill ahead to 10,123~ 03:20 - 03:40 0.33 DRILL C PROD1 Wipe the hole~b 9920'. 03:40 - 05:30 1.83 DRILL C PROD1 Drill ahead~ 10,162' 05:30 - 06:00 0.50 DRILL X F:{REP PROD1 Dowell~riplex pump went down. Suspect problem was fuel tank~'~ow and sucking air into the fuel pump. O/r,d~ivery each day to eliminate pRO/ e problem in the future. 06:00 - 07:00 1.00 DRILL Cx'~ Wiper trip to the window. Memory logged the section of the hole from 9650' to 10,050' while making the wiper trip. 07:00 - 10:30 3.50 DRILL C P~OD1 Drill. Failed packing on Dowell pump. Switch to nabors pump. ,~ Continue drilling in rotation mode to 10263'. In shale. Stacking. 10:30 - 11:00 0.50 DRILL C PROD1 Wiper trip to window 11:00 - 15:00 4.00 DRILL X / SFAL PROD1 Need to lock in TF - finish getting Dowell pump ready. Lines froze. Steam to thaw. 15:00 - 15:30 0.50 DRILL PROD1 RIH. 10215' shale is sticky. Likely Z4 shale, as samples don't DR~ suggest Shublik. 15:30- 17:30 2.00 X SFAL PROD1 Orient. Unable to execute TF command. MM rates bouncing all over the place. Also, bad MWD detection. Also, bad day. 0170 Call DS technician. 17:30 - 20:00 0 DRILL C PROD1 Finally got a TF command to take. Drill ahead to 10,303'. Hole ~s taking mud at a rate of about 12 BPH. 20:00 - 20:10. . DRILL C PROD1 Wiper trip into the tubing tail. 20:10 21.',,3~ 1.42 DRILL X SF^L PROD1 Tie-in to gamma ray for depth control while waiting for the J trouble shooting on the micro-motion meter. Add 7' to coil 2~ depth after tie-in run. Hole taking fluid at a rate of about 8 BPH. - 00:00 2.42 DRILL X SFAL PROD1 Reciprocate pipe while Dowell technician trouble shoots problem with micro-motion and coil cab data display. 11/30/2001,~ 00:00 - 01:35 1.58 DRILL X SFAL PROD1 Wait for Dowell tech to trouble shoot data display and micro-motion. 01:35 - 05:35 4.00 DRILL C PROD1 Drill ahead from 10,303' while in continuous rotation mode. Printed: 12/10/2001 11:16:53 AM STATE OF ALASKA ALASKa...~IL AND GAS CONSERVATION COMI,~..~SION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack . . . Name of Operator BP Exploration (Alaska) Inc. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 Location of well at surface ',/' ~' -.// 5172' NSL, 1808' WEL, SEC. 19, T11 N, R13E, UM At top of productive interval 1268' NSL, 1434' WEL, SEC. 18, T11N, R13E, UM At effective depth 1355' NSL, 570' WEL, SEC. 18, T11N, R13E, UM At total depth 1354' NSL, 492' WEL, SEC. 18, T11 N, R13E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE - 76' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number U-15A 9. Permit Number 10. APl Number 50- 029-22565-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 10138 feet 8898 feet 10052 feet 8896 feet Length Plugs (measured) Junk (measured) Size MD TVD Cemented 110' 20" 260 sx Arcticset (Approx.) 110' 110' 3007' 10-3/4" 940 sx CS III, 375 sx 'G', 190 sx CS II 3036' 3029' 9059' 7-5/8" 265 sx Class 'G' 9086' 8787' 1206' 5-1/2" 260 sx Class 'G' 8932' - 10138' 8677' - 8898' Perforation depth: measured 9178'- 9216', 9340'- 9400', 9580'- 9680', 9720'- 9820' true vertical 8843' - 8863', 8905' - 8910', 8917' - 8923', 8919' - 8905' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 8936' Packers and SSSV (type and measured depth) 7-5/8" Baker 'SABL-3' packer at 8889'; 4-1/2" SSSV Landing Nipple at 2214' 13. Attachments [] Description Summary of Proposal 4. Estimated date for commencing operation October 15, 2001 16. If proposal was verbally approved Name of approver Date Approved Contact Engineer Name/Number: Thomas McCarty, 564-5697 15. [] Detailed Operations Program [] BOP Sketch Status of well classifications as: [] Oil [] Gas [] Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify tha~oing is true and correct to the best of my knowledge Signed Thomas McCart,///~......-/~ > J¢"'~_.,,_.~,~ Title CT Drilling Engineer Conditions of Approval: Notify Commission so representative may witness '~> Plug integrity BOP Test ~ Location clearance Mechanical Integrity Test__ Subsequent form required 10- Original S~ned By Approved by order of the Commission Form 10-403 Rev. 06/15/88 Date Commissioner Date //~,/~// Submit In Triplicate bp To: Tom Maunder Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Thomas McCarty CTD Engineer Date: September 26, 2001 Re: Well U-15A Well U-15A is scheduled for a through tubing sidetrack with coil. The coil sidetrack, U-15B, will kick off from a window milled in the horizontal section of the existing Zone 4 lateral through 5.5" liner, after cement squeezing the existing perfs. The U-15B target is Zone 4. The well was previously permitted for sidetracking in September 1999 (permit no. 99-87, sundry no. 399-172). The permit no 99-87 called for drilling out the shoe and running a slotted liner completion. During the prep work our records revealed a drill collar had been included in the shoe of the existing wellbore. It was found (prior to the milling operation) that the drill collar could not be milled out and the sidetrack was cancelled. A new directional plan has been developed and the well is back on the drilling schedule. The following describes work planned to prep for sidetracking and is submitted as an attachment to Form 10- 403. A schematic diagram of the proposed sidetrack is attached for reference. 1. Gas lift mandrels have been dummied off. 2. Master valve, wing valve and tree were successfully tested to 5000psi. 3. Wellhead seals were tested for integrity. 4. Tubing integrity was verified. 5. Caliper tubing and liner. 6. Tubing and liner drifted with service coil. 7. Service coil will set a mechanical whipstock at approx. 9990' in the 5.5" liner. 8. Service coil will lay in approx. 30 bbls cement & squeeze to shut off all existing perfs. 9. Service coil may then mill out the cement down to the whipstock and mill the window if timing permits. This work will commence on approx. Oct ;1,~, 2001. Thomas McCarty CTD Drilling Engineer 564-5697 mccarttm@ bp.com CC: Well File TRF_E= 4-1/16" CNV SAFETY NOTES: ORI31NAL WELL U-15 WAS P&A'D W/ iA CTUA TOR= BAKER EXCEEDS 70 DEG @ 9300' & GOES HORIZONTAL @ !KB. ELEV = 77.3' 9500'. BF. EI_EV = 4618' KOP: 3050' I 2213' H4-1/Z' I-ES - HXO SSSV NIP, ID: 3.813" I Max An le = 100 i Datum MD = 9242' IDatum-FVD = 8800' SS i ~k GAS LIFT MANDRF. LS I 10-3/4"csc, -80, 9.9 " H 30 , ST 'rVD 'PE V .V ATCH SIZE ATE 6 3172 3163 7 'KBMG-M DV BK 04/27/01 5 5124 5070 20 KBMG-M DV BK 04/27/01 L 4 6639 6507 16 K]3MG- M DV BK 04/27/01 3 7651 7483 16 <BMG-M DV BK 04/27/01 2 8414 8214 18 KBMG-M DV BK 04/'27/01 1 8728 8502 27 KBMG-M UV BK 04/27/01 Minimum ID = 3.725" @ 8923' 4-1/2" HES XN NIPPLE i ; x x 7-5/8" X 5-1/2" BKR I:KR 8932' I I 8935' 4-1/2" WLEG, D = 3.958" OPBxl I-IOIE SID~RACK OFF CMl' @ 9582' I PERFORATION SUMMA RY REF LOG: TCPPERF ANGLEATTOP PEP, F: 55 @ 9178' Note: Refer to R'oduc~on DB for historical perf data SIZE SPF INTERVAL Ogn/Sqz DATE 3-3/8 4 9178'-9216' 0 08102195 3_3/8-4 9340,_9400, 0 08/02/95 I ' 3-3/8" 4 9580' -9680' 0 08102195 i 10050' i3-3/8" 4 9720' -9820' O 08102195 I 5-112"Lbi~,17#,L-80, O:O232bpf, ID'-4.89:Z' q 10138' DATE REV BY i COMIVF_NTS DATE REV BY COIVIV1ENTS PRUDHOEBAY UNIT 08/04/95 KSB ORIGINAL COIVF~I_ETION VVELL: U-15A 02/05/01 SIS-QAA; CONVERTED TO CANVAS PERIVIT No: 95-0970 03/08/01 SIS-MD FINAL APl No: 50-029-22565-01 07/01/01 CH/KAK ~ CORRECTIONS 5173' NSL& 1809' WEL Sec. 19, T11N, R13E ' I BP Exploration (Alaska) SIZE SPF INTERVAL Ogn/Sqz DATE 3-3/8" 4 9178' -921 6' O 08102195 3-3/8" 4 9340' -9400' O 08/02/95 3-3/8" 4 9580' -9680' 0 08102195 3-3/8" 4 9720' -9820' 0 08102195 DATE REV BY COMIVF_NTS DATE REV BY COlVIV1ENTS 08/04/95 KSB ORIGINAL COIVPI_ ETLON 02/05/01 SIS-QAA; CONVERTED TO CANVAS 03/08/01 SIS-MD FINAL 07/01/01 CH/KAK CORRECTIONS 4-1/16" FMC W/4"TREE CAP CAMERON ACTUATOR: BAKER U-15b Proposed Completion KB. ELEV = 77.30' BF. ELEV = 46.80' SSSV LANDING NIPPLE I 2,214 ( HES-HXO )( 3.813" ID ) 10 3/4" 45.5# NT-80 I 3'036['---~' KOP: 2600' MAX ANGLE: Horizontal 4-1/2", 12.6#/ft, L-80, MOD, BTRS TUBING ID: 3.958" CAPACITY: .01522 BBL/FT GAS LIFT MANDRELS 4 1/2" X 1" Camco KBMG-M W/BK LATCH N-° MD(BKB) TVDss Dev 6 3,172 3,163 7.1 5 5,124 5,070 19.9 4 6,639 6,507 16.3 3 7,651 7,483 15.7 2 8,414 8,214 17.8 1 8,728 8,502 27.1 Top of 5-1/2 liner ] 8,932 [ 7-5/8", 29.7#/ft, NSCC, 13CR &[ 9'0861 S95 MOD BTRS Top of Liner approx. 9060' MD (8694ss) 4-1/2 .... X" NIPPLE I (HES) (3.813" ID) 8,877 -- ~R 7-5/8" PACKER SABL-3)(3.875"ID) [ 8,889 4-1/2 .... X" NIPPLE (HES) (3.813" ID) 4-1/2 .... XN" NIPPLE ( HES ) ( 3.725" ID) 4-1/2" WLEG (ELMD) 8,9121 8,923[ 8,936 2 7/8" ST-L 3 3/16" TC II PERFORATION SUMMARY ISize ISPFI Interval, Iopen/Sqzed 3-3/8"I 4 I 9,178-9,216 [Open 3-3/8"I 4 I 9,340-9,400' IOpen 3-3/8"] 4 [ 9,5a0-9,680' ]Open 3,-3/8"I4 I 9,720-9,820' IOpen Top of whipstock approx. 9990' MD hole angle = 89 deg. PBTD (Landing Collar) [ 1 0,052 [ 5.5" 17# L-80, LTC MOD 10,138 TI-W, MATERIAI~ UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03,2001 M PL A T E W IA L UNDER T H I $ M A R K E R C:LO~M.DOC STATE OF ALASKA ALASKA'~,L AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: ~ [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other  [Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Admin. Abandon for Ext. 2. Name of Operato{ i ' ~5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. t [] Development KBE = 76.10' I--I Exploratory 7. Unit or Property Name 3. Address ' I~Stratigraphic Prudhoe Bay Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [~]Service 4. Location of well at surface 5173' NSL, 1809' WEL, SEC. 19, T11N, R13E, UM At top of productive interval 1356' NSL, 854' WEL, SEC. 18, T11 N, R13E, UM At effective depth 1355' NSL, 570' WEL, SEC. 18, T11N, R13E, UM At total depth 1354' NSL, 492' WEL, SEC. 18, T11N, R13E, UM 8. Well Number U-15A 9. Permit Number 95-97 10. APl Number 50-029-22565-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 10138 feet true vertical 8822 feet Effective depth: measured 10052 feet true vertical 8821 feet casing Length Size Structural Conductor 110' 20" Surface 3007' 10-3/4" Intermediate 9059' 7-5/8" Production Liner 1206' 5-1/2" Plugs (measured) Junk (measured) ORIGINAL Cemented MD TVD 260 sx Arcticset (Approx.) 110' 110' 940 sx CS III, 375 sx 'G', 190 sx CS II 3036' 3029' 265 sx Class 'G' 9086' 8787' 260 sx Class 'G' 8932' - 10138' 8677' - 8898' Perforation depth' measured true vertical 9178'-9216', 9340'-9400', 9580'-9680', 9720'-9820' 8820'-8822', 8829'-8832', 8841'-8847', 8844'-8829' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 8936' o . Packers and SSSV (type and measured depth) 7-5/8" Baker 'SABL-3' packer at 8889'; 4-1/2" SSSV Landing Nipple at 2214' 13. Attachments [~ Description summary of proposal I--I Detailed operations program I--I BOP sketch 14. Estimated date for commencing operation September 20, 1999 16. If proposal was verbally approved Name of approver Contact Engineer Name/Number: Ted Stagg, 564-4694 Date approved 15. Status of well classifications as: [~ Oil I--] Gas [--~ Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the fo/~e~oing is true and correct to the best of my knowledge Signed Ted Stagg ~-¢-.,¢~~.~ Title CT Drilling Engineer Commission Use Only Date Conditions of Approval: Notify Commission so representative may witness Plug integrity_ BOP Test __ Location clearance __ Mechanical Integrity Test__ Subsequent form required 10- ~.¢ .'~' ,w,..,.,,~ec~ 009'¢ Approved by order of the Commission -~r~!GINAL SIGNED BY ;:"- 'p. ei~missioner Form 10-403 Rev. 06/15/88 Robert N. f,;hdstenson Date Submit In Triplicate d rvlces riiling Date: August 30,1999 To' Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Blair Wondzell Sr. Petroleum Engineer Re; Well U-15b Prep for CT Extension Well U-15a is scheduled for a through tubing extension to be drilled with coiled tubing. The following summarizes the procedure required to prepare U-15a for the extension and is submitted as an attachment to Form 10-403. A schematic diagram of this proposed completion is attached. 1. A Tubing Integrity Test will be performed. 2. A drift run will be made to the XN nipple. 3. The well will be killed with 2% KC1 prior to rigging up the drilling coil. Ted Stagg CT Drilling Engineer cc: Well File Petrotechnical Data Center I'REE: 4-1/16" FMC W/4"TREE CAP ¢/ELLHEAD: CAMERON ~,CTUATOR: BAKER U-15b Proposed Completion KB. ELEV: 77.30' BF. ELEV- 46.80' SSSV LANDING NIPPLE I 2,214I ( HES-HXO )( 3.813" ID ) 10 3/4" 45.5# i._.~..~~ NT-80 I 3,036 KOP: 2600' MAX ANGLE: Horizontal 4-1/2", 12.6#/ft, L-80, MOD, BTRS TUBING ID: 3.958" CAPACITY: .01522 BBL/FT GAS LIFT MANDRELS 4 1/2" X 1" Camco KBMG-M W/BK LATCH N° MD(BKB) TVDss Dev 6 3,172 3,163 7.1 5 5,124 5,070 19.9 4 6,639 6,507 16.3 3 7,651 7,483 15.7 2 8,414 8,214 17.8 1 8,728 8,502 27.1 Top of 5-1/2 liner I 8'9321 7-5/8", 29.7#/ft, , oo, 19'086l S95 MOD BTRS PERFORATION SUMMARY REF. LOG: TIE IN LOG: Size SPF Interval i Open/Sqzed 3-3/8" 4 9,178- 9,216' Open 3-3/8" 4 9,340 - 9,400' Open 3-3/8" 4 9,580- 9,680' Open 3-3/8" 4 9,720- 9,820' Open 4-1/2 .... X" NIPPLE (HES) ( 3.813" ID) I 8,877 7-5/8" PACKER ~~'~(BAKERSABL-3)(3.875"ID) I 8'8891 4'1/2 X"NIPPLE I .... (HES) (3.813" ID) 8,912 4-1/2 .... XN" NIPPLE (HES) (3.725" ID) I 8'9231 4-1/2" WLEG (ELMD) 8,936 PBTD (Landing CoUar) 110,052 5.5" 17# L-80, LTC MOD 110,138 -- i ii 3.75" extension to be completed w/ 2 7/8" slotted liner. Original U-15a perfs will not be abandoned. R I..I It D/.', T E ..... R i: C: V D 95-~09'? PI,.S (STA'TZC) 95--'097 75S2 95 ~-' 097 '? 543 :~:'8660-9S00 F I N A L 09/' 06/96 i .2/05/'96 12/ors/ss '12J 05/!it 6 DAZL. Y WELL. C'.F'S '-/~ ~ i // / ~:/ T?, ~/' ~-!'/' q.:/" lA z"g~,"¢¢~>''' RECEIVED S£P 0 1996 HOWARD OKLANDAl~i~ :~ i"~ r.. ~.:._...w,_~,i.~l]$,~fl~m~Date:^.~_~_ 29 August 1996 Attn. ALASKA OIL + GAS CONSERVATION M~I~IUI~e 3001 PORCUPINE DRIVE RE: Transmittal of Data ANCHORAGE AK, 99501. Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION ECC No. 1 CN FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/pERF FINAL BL+RF 1 CN FINAL BL+RF 1 CN FINAL BL+RF 1 PLS FINAL BL+RF Run # 1 3099.03 Run # 1 4041.07 Run # 1 4146.03 Run # 1 4528.08 Run # 1 4588.04 Run # 1 4751.09 Run # 1 5666.06 . Run # 1 6054.07 Run # 1 6287.02 Run # i 6783.00 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 ~ ~ Anchorage, A~ 99518 I.-~'~ Or FAX to (907) 563-7803 Received by: _~~,~~ Date: D I::1 I I__1__ I IM G S E I::i~dl C G S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn: Larry'Grant 3001 Porcupine Drive Anchorage, Alaska 99501 November 17, 1995 MWD Formation Evaluation Logs - U-15A, PB 1 & PB2, AK-MW-50060 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention off Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 U-15A: 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-22565-01 1 Blueline 1 Rev Folded Sepia 2" x 5" TVD Resistivity and Gamma Ray Logs: 1 Blueline 50-029-22565-01 1 Rev Folded Sepia 2" x 5" MD Resistivi~ and Ga~a R~gs: ~. 4~uehne.~ ~ ~ ' 50-029-22565-70 ~ ]~o~ l~ev Folded Sepia 2" x 5" TVD ResistiviW and Ga~a Ray Logs: ~a o%., 1 Blueline 50-029-22565-70 '<~*/o~ Rev Folded Sepia U-15A PB2: 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-22565-71 1 Blueline 1 Rev Folded Sepia 2" x 5" TVD Resistivity and Gamma Ray Logs: 1 Blueline 50-029-22565-71 ~ A ~ 1 Rev Folded Sepia ,. 5631 SilveC~,,~,.Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company CI I::t I I--I-- I IM G SIm FIVI I-- lm S WELL LOG TRANSMITTAL To: State of Alaska December 3, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland ~ ~ - O el"l 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - U-15A PB1, U-15A PB2 & U-15A AK-MW-S0060 4 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jirn Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 3 LDWG formatted LIS tapes with verification listing. APl#: 50-029-22565-01, 50-029-22565-70 & 50-029-22565-71 Respectively. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classifidatidn/o~Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] ',._/ 2. Name of Operator 7. Permit Number BP Exploration 95-97 3. Address ~. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22565-01 4. Location of well at surface 9. Unit or Lease Name ~i .... ,'~,r:,;~[',Prudhoe Bay Unit ~ ..--:~.- .... ;:- 10. Well Number At Top Producing Interval : ~~;';: O-15A 1356' NSL, 854' WEL, SEC. 18, T11N, R13E ............... . 11. Field and Pool 1354' NSI., 492' WEI_, SEC. 18, T11N, R13£ - . 5. Elevation in feet (indicate KB, DF, etc.)KBE = 76.10' 16' Lease DesignatiOn and Sedal NO' 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 16. No, of Completions 06/27/95 07/30/95 08/04/95I N/A feet MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 10138'MD/8822'TVD 10052'MD/8821'TVD YES [] NO []I 2213feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD/LWD, GR, RLL 23. CASING, UNER AND CEMENTING RECORD SE[TING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.) 10-3/4" 45.5# NT8OLHE 29' 3036' 13-1/2" 940 sx cs///, 375 sx 'G', ~90 sx CS # 7-5/8" 29. 7# 13CR80/NT95HS 27' 9086' 9-7/8" 265 SX Class 'G' 5-1/2" 17# L-80 8932' 10138' 6-3/4" 260 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 4 spf 4-1/2" 8936' 8889' MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9178', 9216' 8820'- 8822' Freeze Protect w/92 bbl Diesel 9340'- 9400' 8829'- 8832' 9580'- 9680' 8841'- 8847' 9720'- 9820' 8844'- 8829' 27. PRODUC'RON TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) August21, 1995 I Gas Lift Date of Test Hours Tested 3RODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO ['EST PERIOD II~ Flow Tubing Casing Pressure ,%aI.CUL~'i'~D..~ OIL-BBL GAS-MCF WATER-BBI elL GRAVITY-APl {corr) Press. :>4-HOUR R~TE ~r 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECE VI::u UPLiCAT - OEC- 4 1995 An~or~je Form 10-407 Submit in duplicate Rev. 7-1-80 ~;ONTINUED ON REVERSE SIDE 29.' 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. 8819' Sag River 9160' 8823' Shublik 9222' 8836' Top Sadlerochit 9775' 31. LIST OF A'I-I'ACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: U-15A BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 06/12/95 12:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 18E WO/C RIG: NABORS 18E 06/11/95 ( 1) TD: 0'( 0) 06/12/95 ( 2) TD: 110' ( 110) 06/13/95 (3) TD: 800' ( 690) 06/14/95 ( 4) TD: 3050' (2250) 06/15/95 (5) TD: 3050'( 0) MOVING RIG MW: 0.0 VIS: 0 MOVING RIG. BLOW DOWN RIG. DISCONNECT LINES AND CABLES. SPLIT COMPLEXES AND PULL SUB OFF HOLE. MOVE PIPE SHEDS, MOTOR, PIT AND BOILER COMPLEXES TO U PAD. L/D DERRICK AND UNPIN. PREP DERRICK AND SUB TO MOVE TO U PAD. MOVING RIG MW: 0.0 VIS: 0 CONTINUE RIG MOVE TO U PAD. MOVE ALL COMPLEXES TO NEW LOCATION. PIN DERRICK AND RAISE SAME. MOVE SUB OVER HOLE AND SPOT OTHER COMPLEXES. DRILLING MW: 0.0 VIS: 0 CONTINUE RIGGING UP ON U-15. RU FLOOR. NU DIVERTER AND FUNCTION TEST SAME. MOVE SHOP AND SATELLITE CAMP FROM DS 7. TAKE ON WATER AND FUEL. CIRC AND TEST LINES. ACCEPT RIG ON U-15 @ 1200 HRS ON 06/12/95. MIX SPUD MUD. BUILD BERMS AROUND COMPLEXES. STRAP AND START PU BHA. DRILLED TO 800'. DRILLING MW: 0.0 VIS: 0 DRILLED TO 1026'. POH TO 240'. PULL TO JARS. RIH. WASH AND REAM 887 - BTM. DRILLED TO 2095'. POH TO 1013'. RIH TO 2095'. DRILLED TO 3050'. RIGGED DOWN DIVERTOR MW: 0.0 VIS: 0 DRILLED TO 3050'. CIRCULATED. OBTAINED BOTTOMS UP. POH TO 750' RIH TO 3050' OPBTAINED BOTTOMS UP. POH TO 240'. PULLED BHA. BHA LAID OUT. RU CASERS_ RAN 74 JTS 10 3/4" 45.5# NT-80 BTT CSG. PU HANGER AND LANDING JT. LANDED CSG. MU CMT'G HEAD. CIRCULATED @ 3036'. CIRC AND COND MUD AND HOLE FOR CMT JOB. OBTAINED BOTTOMS UP. TEST BJ'S LINES. PUMPED 75 BBLS WATER AHEAD, 322 BBLS LEAD SLURRY - COLDSET 3 @ 12.2 PPG, 77 BBLS TAIL - CL "G" W/ ADDITIVES @ 15.8 PPG. DISPLACED W/ 288 BBLS MUD @ 14 BPM. PLUG DID NOT BUMP. LOST PARTAIL RETURNS W/ 112 BBLS DISPL. PUMPED. CIP. NO CEMENT TO SURFACE. FLOATS HELD. MIXED AND PUMPED SLURRY. RIGGED DOWN CASING HANDLING EQUIPMENT. RIGGED DOWN DIVERTOR. WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 2 06/16/95 (6) TD: 3050' ( 0) 06/17/95 ( 7) TD: 4710' (1660) 06/18/95 (8) TD: 5663' ( 953) 06/19/95 ( 9) TD: 6969' (1306) 06/20/95 (10) TD: 8325'(1356) 06/21/95 (11) TD: 8915' ( 590) WELL CONTROL MW: 0.0 VIS: 0 NIPPLE DOWN DIVEROTR. INSTALLED WELLHEAD PRIMARY COMPONENTS. NU 13 5/8" - 5000 PSI FMC SPLIT UNIHEAD. NIPPLE UP BOP STACK. TEST SSH TO 1000 PSI. CHANGE UPPER RAMS TO 5". REPAIRED KILL MANIFOLD. CHANGED OUT 3" - 5M MANUAL KILL LINE VALVE. KILL MANIFOLD CHANGED OUT. TEST WELL CONTROL EQUIPMENT. INSTALLED BOPS, HYDRIL AND VOLUME TEST KOOMEY. HAD TWO LEAKS. REPAIRED AND RETESTED. MADE UP BHA #2. RIH TO 1950'. CIRCULATE. TESTED KELLY COCKS. TEST UPPER AND LOWER KELLY COCKS. WELL CONTROL. DRILLED MW: 0.0 VIS: 0 RIH T/2904. DRILLED CMT T/2944. TEST CSG T/3000/30 MIN. DRILLED CMT T/3036. PERFORMED FIT. PUMPED IN @ 550 PSI W/9.2 PPG MUD. EMW = 12.6 PPG. DRILLED T/4054. PULL DO T/3036. DRILLED T/4710. RIH T/3100 MW: 0.0 VIS: 0 DRILLED T/5073. CBU. DRILLED T/5663. CBU. SLUG DP. OBTAINED 100% ANNULUS VOL. POOH SWABBING F/3800 T/3200. LD BIT 32. MU BIT #3. ORIENT & RIH T/800. STOP T/SERV. EQUIP. RIH T/3100. CBU. DRILLING MW: 0.0 VIS: 0 CBU @ 3100. RIH T/5607. REAM 56' T/BTTM. HOLE IN GOOD SHAPE. DRILL T/5733. STOP T/CHANGE VALVE SEATS IN 32 PUMP. DRILLED T/6685. CBU. POOH T/5600. RIH T/6685. DRILLED T/6969. DRILLING MW: 0.0 VIS: 0 DRILLED TO 7659' RAN DRILL OFF TEST @ 7265'. POH TO 6615'. RIH TO 7~80'. NO PROBLEMS, RIH. DRILLED TO 8325'. RAN DRILL OFF TEST @ 8035 - 8066' DRILLING MW: 0.0 VIS: 0 DRILLED TO 8327' MADE 11' IN 2 3/4 HRS. UNABLE TO GET BIT TO DRLG. LO~T ALL DIFF PRESSURE AND TORQUE. PUMP SWEEP AROUND. POH TO 692' HOLE IN GOOD SHAPE. L/D BIT AND MOTOR. CUTTING STRUCTURE ON BIT WAS IN GOOD SHAPE. BIT HAD TO BE BALLED UP. SLM. NO CORRECTION. P/U REBUILD PDC BIT, 7 3/4" STANDARD SLOW SPEED MOTOR -1 1/4 BENT HOUSING, AND BUMPER SUB. ORIENT AND SURFACE CHECK. CHANGE OUT KELLY WIPPER. RIH TO 7874'. TIGHT HOLE @ 7874'. REAMED TO 7934'. RIH TO 8317'. WASHED 20' TO BTM. NO FILL. DRILLED TO 8915'. DEC - 4 199(~ Anoho~je WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 3 06/22/95 (12) TD: 9835' ( 920) 06/23/95 (13) TD:10030' ( 195) 06/24/95 (14) TD:10405' ( 375) 06/25/95 (15) TD:10405' ( 0) 06/26/95 (16) TD:10405' ( 0) DRILLING MW: 0.0 VIS: 0 DRILLED TO 9326'. POH TO 8250'. NO DRAG. RIH TO 9310' HOLE IN GOOD SHAPE. NO FILL. DRILLED TO 9835' DRILLING MW: 0.0 VIS: 0 DRILLED TO 9890'. CIRCUALATED. OBTAINED BOTTOMS UP. PUMPED HIGH VIS SWEEP AROUND. POH TO 693'. HOLE IN GOOD SHAPE. PULLED BHA. L/D BUMPER SUB, JARS, MWD, NMLC, AND MOTOR. BIT WAS GREEN 1-1WT-FULL GAGE. SERVICED WEAR RING. MADE UP BHA #5. ROTARY ASSEMBLY. RIH TO 9757'. P/U KELLY. WASHED AND REAMED 123' TO BTM. HOLE IN GOOD SHAPE. DRILLED TO 10030'. NO PROBLEMS. NO MUD LOSS. TOP OF SAG RIVER @ 9910', TOP OF SHUBLIK @ 9938'. RAN ELECTRIC LINES MW: 0.0 VIS: 0 DRILLED TO 10405'. NO PROBLEMS AND NO MUD LOSS. CIRCULATED AT 10405'. POH TO 9450'. NO DRAG. HOLE IN GOOD SHAPE. RIH TO 10385'. WASHED 20' TO BTM. NO FILL. CIRCULATED 8 10405' PUMP HIGH VIS SWEEP AROUND. COND MUD AND HOLE FOR LOGS. OBTAINED BOTTOMS UP. TOOK EMS SURVEY 8 10405'. DROPPED EMS. CHECK FOR FLOW. SLUG DP. HOLE IN GOOD SHAPE. PULLED BHA. L/D NM_DC'S, STABILIZERS, SHORT DC. R/U LOGGERS. ATLAS RAN DISL/BHC-AL/SP/GR F/ 10307 - 3036'. TOOLS SET DOWN 8 6540' PU AND GOT DOWN. HOLE IN GOOD SHAPE. REAM TO 10325' MW: 0.0 VIS: 0 P/U ATLAS FMT/GR TOOL. RIH. HIT LEDGE 8 6850'. POH W/ FMT TOOL. R/D ATLAS. PULLED WEAR RING AND SET TEST PLUG. TEST BOPE, HYDRIL. NO FAILURES. PULLED TEST PLUG AND SET WEAR RING. MADE UP BHA #6. SERVICED BLOCK LINE. CUT DRLG LINE. RIH TO 3000'. CIRCULATE. TEST UPPER AND LOWER KELLY COCKS AND MUD LINES. RIH TO 10307'. BIT STOPPED 810307'. REAM AND DRILL F/ 10307 - 10325' MIXED AND PUMPED SLURRY MW: 0.0 VIS: 0 REAMED TO 10378' CIRCULATE. OBTAINED BOTTOMS UP. CIRC BTTMS UP AND PUMP HIGH VIS SWEEP AROUND. SLUG DP AND OBSERVE WELL. HOLE IN GOOD SHAPE. PULLED BHA. L/D BHA FOR INSPECTION. RAN ELECTRIC LINES. RIH TO 10400'. RIH W/ MULE SHOE SUB AND DP TO 10400' TO SPOT CMT ABANDONMENT PLUG. PU 21 JTS 5" DP. CIRCULATED @ 10400'. CIRC AND COND MUD TO SPOT BALANCED CMT PLUG. BATCH MIXED CMT. TEST BJ'S LINES. SPOT BALANCED PLUG IN 9 7/8" OPEN HOLE F/ 10400 - 9888'. PUMPED 35 BBLS WATER AHEAD, 49 BBLS SLURRY. PULLED DRILLPIPE IN STANDS TO 9840'_ CIRCULATED. CIRC AND COND MUD TO SPOT BALANCED CMT PLUG #2. MUD CONTAMINATED W/ CMT. CONDITION MUD. BATCH MIX CMT. TEST LINES. BALANCED PLUG. WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 4 06/27/95 (17) TD:10405' ( 0) 06/28/95 (18) TD:10405' ( 0) 06/29/95 (19) TD: 4772' ( 0) 06/30/95 (20) TD: 5954' (1182) 07/01/95 (21) TD: 6905' ( 951) 07/02/95 (22) TD: 8195' (1290) TESTING BOP STACK MW: 0.0 VIS: 0 DISPLACED SLURRY. RIG DOWN CIRC HEAD. PULLED DRILLPIPE IN STANDS TO 8905'. CIRCULATED. CIRC AND WORK PIPE AT 8905'. WASHED TO 9480'. TOP OF CMT @ 9480'. LAID DOWN DRILLPIPE TO 3518' CIRCULATED. CIRC BTTMS UP AND SPOT 30 HIGH VIS PILL IN ~ 7/8" OPEN HOLE F/ 3518 - 3286'. LAID DOWN DRILLPIPE TO 3334'. CIRC AND COND MUD TO SPOT KICKOFF PLUG. TEST LINES. BJ SPOTTED BALANCE KICKOFF PLUG IN 9 7/8" OPEN HOLE. CLEARED AND FLUSHED OUT DP @ 2040'. L/D MULE SHOE SUB. RIH W/ EXTRA 5" DP ON LEFT HAND SIDE OF DERRICK. L/D SAME. PULLED WEAR RING AND SET TEST PLUG. START TESTING. CHANGING TO ST OPERATIONS MW: 0.0 VIS: 0 TEST WELL CONTROL EQUIPMENT. TEST BOP STACK. CEMENT: KICKOFF PLUG. WAIT ON CEMENT. INSTALLED NEW BRAKE BAND EYE BOLTS. RESUMED OPERATIONS. MADE UP BHA NO. 7. ORIENT AND SURFACE TEST MOTOR AND MWD. BHA NO. 7 MADE UP. RIH TO 2705'. THIS AFE WELL RELEASED AT 14:30 HRS. DRILLED TO 4772' MW: 0.0 VIS: 0 BHA RUN NO. 1. DRILLED TO 3300'. DRILLED F/3300'-3490' CHANGED OUT SHAKER SCREENS DUE TO BLINDING FORMATION CLAYS. DRILLED TO 4045'. STARTED SCHEDULED WIPER TRIP DUE TO TIME ELAPSED. CIRCULATED AND SHORT TRIP 11 STANDS TO SHOE. HOLE IN GOOD SHAPE. BROKE CIRCULATION ON BOTTOM BEGIN TO DRILL. DRILLED TO 4772'. DRILL, ORIENT AS PER DIRECTIONAL PLAN. DRILLED FROM 3300'-4772' NOTE: VERTICAL SECTION SURVEYS IN DEAP ARE NOT ACCEPTING ACCURATE SURVEYS FROM ON LOCATION. WILL SEND IN HARD COPY AND CONTINUE TO ATTEMPT TO GET CORRECT ENTRY IN DEAP. DRILLING MW: 0.0 VIS: 0 DRILLED TO 5030'. CIRCULATED. SHORT TRIP 22 STANDS TO SHOE. HOLE IN GOOD SHAPE. BROKE CIRCULATION. DRILLED TO 5186' BIT QUIT. PREPARE TO POH FOR BIT #2. POH TO 5186'. MADE UP BHA #2. CHANGE MW/) AND PICK UP 9 7/8" BIT #2 - STC ME0200DCL. RIH TO 5186' CIRC @ SHOE AND TRIP INT© 5120'. REAMED F/ 5120 - 518~', NO FILL, HOLE IN GOOD CONDITION. DRILLED TO 5954'. DRILLING MW: 0.0 VIS: 0 DRILL T/6190. CBU. DRILL T/6295. DOWNHOLE TOOL FAILURE. CIR - PUMP PILL & POOH. MU BHA 93. RIH T/6295. FUNCTION TEST MOTOR. DRILL T/6905. DRILLING MW: 0.0 VIS: 0 DRILLING T/7300. CBU. DRILLED T/8195 WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 5 07/03/95 (23) TD: 8577' ( 382) 07/04/95 (24) TD: 9029' ( 452) 07/05/95 (25) TD: 9097' ( 68) 07/06/95 (26) TD: 9097' ( 0) DRILLING MW: 0.0 VIS: 0 DRILL T/8435. CBU. PUMP SLUG. POOH T/8435. LD BHA %3. MU BHA #4 & RIH T/8435. SERVICE LINES & CABLES, CUT 105' OF DL. RIH T/8435. DRILL T/8577. DRILLING MW: 0.0 VIS: 0 DRILL T/9029. POOH T/9097 MW: 0.0 VIS: 0 DRILL T/9097. CBU. POOH. MU BHA %5. RIH TAKE BENCHMARK SURVEY @5146, WASH & REAM HOLE T/9097. CBU. SWEEP HOLE W/SLUG. 100% HOLE VOL. CASING & TEST WELL CTRL EQUIP MW: 0.0 VIS: 0 BHA RUN NO. 5, PULLED BHA, LAID OUT. NIPPLE UP TOP RAM. INSTALLED 7-5/8" TOP RAMS AND TESTED CAVITY TO 3000 PSI, OK. RIGGED UP TOP RAM. WORK COMPLETED - TOP RAM IN POSITION. RUN CASING, 7-5/8" OD. RIGGED UP CASING HANDLING EQUIPMENT, CHROME CASING HANDLING EQUIPMENT. WORK COMPLETED - CASING HANDLING EQUIPMENT IN POSITION. RAN CASING TO 9086', RAN TOTAL 10 JTS CHROME AND 209 JTS S-95 CSG. SETTING DEPTH 9086'. CEMENT CASING, CIRCULATED AT 9086'. CIRC AND RECIPROCATE AT 10 BPM WHILE BATCH MIXING CEMENT. HOLE DISPLACED WITH WATER BASED MUD - 200% DISPLACED. MIXED & PUMPED SLURRY - 53.900 BBL. PMP 5 BBLS H20 AND TEST LINES TO 4000 PSI. FINISH PMP TOTAL 20 BBLS H20. PMP 70 BBLS SPACER AT 10.0 PPG. PMP 53.9 BBLS CLASS G CMT + ADDITIVES AT 15.8 PPG. DROPPED TOP PLUG AND DISPLACED W/5 BBL H20 AND 410 BBLS MUD. DID NOT BUMP PLUG. CEMENT PUMPED. CIP @ 0100 HRS 4/6/95. RIGGED DOWN SERVICE LINES. R/D CMT EQUIP. L/D LANDING JT. WORK COMPLETED, EQUIPMENT LAID OUT. WELLHEAD WORK, INSTALLED SEAL ASSEMBLY. INSTALL 7-5/8" PACKOFF AND TEST TO 5000 PSI, OK. EQUIPMENT WORK COMPLETED, SEAL ENERGIZED. NIPPLE UP TOP RAM, RIGGED UP TOP RAM. INSTALLED 3-1/2" RAMS IN TOP PIPE RAM. WORK COMPLETED - TOP RAM IN POSITION. TEST WELL CONTROL EQUIPMENT. TESTED BOP STACK. TESTING BOP EQUIPMENT 250/5000 PSI. WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 6 07/07/95 (27) TD: 9175' ( 78) 07/08/95 (28) TD: 9375' ( 200) DRILLING TO 9175' MW: 0.0 VIS: 0 TEST WELL CONTROL EQUIPMENT. TESTED BOP STACK. FINISH TEST BOP'S. WITNESS OF TEST WAIVED BY J. SPAULDING, AOGCC. PRESSURE TEST COMPLETED SUCCESSFULLY - 5000 PSI. RIGGED UP KELLY. CHANGED OUT 5" KELLY TO 3-1/2" KELLY. RIGGED UP KELLY/TOP DRIVE HOSE, TESTED KELLY VALVES - OK. BHA RUN NO. 6. 1.83 DEG BH ANADRILL MOTOR. MADE UP BHA NO. 6. P/U BIT, MOTOR, MWD AND ORIENT. FLOW TEST MOTOR. SINGLED IN DRILL PIPE TO 8635' RIH, STOPPED TO SURVEY AND RECORD RA MARKER. TOOK MWD SURVEY AT 8661'. DRILLED CEMENT FROM 8677' TO 8709'. STOPPED TO TEST CASING, VIA ANNULUS. PRESSURE TEST COMPLETED SUCCESSFULLY - 3500 PSI. 30 MIN CASING TEST - OK. DRILLED CEMENT AND FLOAT EQ. + 10' NEW HOLE TO 9107'. FC AT 9014' DPM. CIRCULATED AT 9107'. CHANGE OVER MUD SYSTEM TO FLO-PRO. HOLE DISPLACED WITH WATER BASED MUD - 100% DISPLACED. DRILLED TO 9185'. SLIDING BUILDING ANGLE. HOLE SWEPT W/SLUG, 100% VOLUME MW: 0.0 VIS: 0 DRILLED TO 9311'; AST-5.5 HRS, ADT-2.5 HRS. OBSERVED 100 KLB DRAG ON CONNECTIONS. LAID DOWN DRILL PIPE TO 9096'. PULLED SINGLES, PULLING HARD ALL THE WAY TO SHOE. WORK PIPE THROUGH TIGHT SPOTS. GEOLOGY? APPEARS TO HAVE CROSSED FAULT INTO THE KINGAK. AT 7-5/8" CASING SHOE. CIRCULATED AT 9097'. CIRCULATE AND ROTATE IN CSG TO CLEAN BHA. APPEARED TO HAVE PULLED MUD BALL INTO CASING. HOLE SWEPT WITHSLUG - 150% HOLE VOLUME. SWEPT HOLE WITH LO VISC SWEEP TO CLEAN BHA. REAMED TO 9245'. WASH AND REAM TIGHT HOLE. BEGAN PRECAUTIONARY MEASURES. PULLED OUT OF HOLE TO 9097'. PULLED INTO CASING TO WEIGHT UP MUD TO 9.6 PPG. AT 7-5/8" CASING SHOE. CIRCULATED AT 9097'. WEIGHT UP FLO-PRO FROM 9.0 PPG TO 9.6 PPG FOR SHALE CONTROL. OBTAINED REQ'D FLUID PROPERTIES - 200% HOLE VOLUME. REAMED TO 9311'. REAM F/9124' TO 9311'. LOST 3 DOG ANGLE AT 90234 SURVEY POINT. SIDETRACKED OLD HOLE AT APPROX. 9200'? ON BOTTOM. DRILLED TO 9375'; ART-1.5 HRS, AST- 3.75 HRS. ROP DROPPED FROM 15.0 FT/HR TO 6.0 FT/HR - BIT QUIT. TRIP FOR BIT AND BHA. CIRCULATED AT 9375'. HOLE SWEPT WITH SLUG - 100% HOLE VOLUME. WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 7 07/09/95 (29) TD: 9425' ( 50) 07/10/95 (30) TD: 9530' ( 105) DRILLED TO 9425' MW: 0.0 VIS: 0 CIRCULATED AT 9375'. HOLE SWEPT WITH SLUG - 150% HOLE VOLUME. WELLBORE SURVEY, MAD PASS FROM 8763' - 9050' PULLED OUT OF HOLE TO 8763'. AT TOP OF CHECK TRIP INTERVAL. RIH TO 9050'. RIH SLOW WITH STANDS LOGGING W/GR FOR TIE-IN. AT 7-5/8" CASING SHOE. BHA RUN NO. 6. PULLED OUT OF HOLE TO 193'. DOWNLOAD MWD AND CHANGEOUT BIT. MADE UP BHA NO. 7. CHANGE BEND IN MOTOR TO 1.5 DEG. ORIENTATE AND FLOWCHECK. RIH TO 9135'. TIGHT HOLE BELOW CASING SHOE. BEGAN PRECAUTIONARY MEASURES. LAID DOWN DRILL PIPE TO 9050'. 5 JOINTS LAID OUT. REAMED TO 9135'. OBSERVED 100 KLB RESISTANCE. CIRCULATED AT 9050'. GOT BACK INTO CASING AND MADE DECISION TO WEIGHT UP TO 10 PPG. KINGAK SHALE UNSTABLE. OBTAINED REQ'D FLUID PROPERTIES - 200% HOLE VOLUME. REAMED TO 9167'. PACKING OFF. OBSERVED 30 KLB RESISTANCE. LAID DOWN DRILL PIPE TO 9019'. PACKING OFF INSIDE CASING. BEGAN PRECAUTIONARY MEASURES. CIRCULATED AT 9019'. CIRC LOW VISC SWEEP TO CLEAN BHA. OBTAINED BOTTOMS UP (100% ANNULUS VOLUME). SHALE CUTTINGS, NO LARGE SPLINTERS ON BOTTOMS UP. REAMED TO 9375'. PRECAUTIONARY REAM TO BOTTOM. DRILLED TO 9425'. DRILLING W/1.5 DEG BH MOTOR. AST=2.0 HRS, ART=i.0 HRS. DRILLED TO 9530' MW: 0.0 VIS: 0 DRILLED TO 9481', 1.5 DEG BH MOTOR. STARTED SCHEDULED WIPER TRIP: DUE TO TIME ELAPSED AST=2.5 HRS, ART=I.5 HRS. CIRCULATED AT 9481'. PUMPED LOW VISC SWEEP. HOLE SWEPT WITH SLUG - 150% HOLE VOLUME. PULLED OUT OF HOLE TO 9050'. TIGHT AT 9160'. AT 7-5/8" CASING SHOE. REAMED TO 9160', TIGHT AT 9130' TO 9160'. HAD TO WORK PIPE TO GET FREE. OBSERVED 100 KLB RESISTANCE. PULLED OUT OF HOLE TO 9050'. AT 7-5/8" CASING SHOE. CIRCULATED AT 9050. CIRC LOW VISC SWEEP. HOLE SWEPT WITH SLUG - 150% HOLE VOLUME. REAMED TO 9199' REAM TIGHT HOLE F/9097' TO 9199'. NO FURTHER RESISTANCE. RIH TO 9481'. ON BOTTOM. DRILLED TO 9530'. ORIENT DOWN AND SLIDE DROPPING ANGLE LOOKING FOR SADLEROCHIT. AST=6.75 HRS. WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 8 07/11/95 (31) TD: 9585' ( 55) 07/12/95 (32) TD: 9750' ( 165) 07/13/95 (33) TD: 9814' ( 64) 07/14/95 (34) TD:10100' ( 286) 07/15/95 (35) TD:10100' ( 0) DRILLED TO 9585' MW: 0.0 VIS: 0 DRILLED TO 9550', ART+I HRS, AST=i HRS. MWD FAILED - END BHA RUN. ORIENTATION OF MWD / BH MOTOR OFF. CIRCULATED AT 9550'. HOLE SWEPT WITH SLUG - 150% HOLE VOLUME. PULLED OUT OF HOLE TO 234'. BENCHMARKED AT 9344', MWD OK. DOWNLOAD SPERRY SUN. CHECKED ORIENTATION OF MOTOR, 100 DEG OFF. BHA RUN NO. 8. 1.5 DEG BH 4-3/4" ANADRIL MOTOR. CHANGED OUT BIT AND MOTOR, ORIENTATED MWD/LWD. L/D BUMPER SUB, DAMAGED SEALS. RIH TO 7000'. BEGAN PRECVAUTIONARY MEASURES. RIH TO 9135'. RIH AND TAGGED UP ON TIGHT SPOT IN KINGAK SHALE. BEGAN PRECAUTIONARY MEASURES. REAMED AND WORKED THROUGH KINGAK AND ON TO BOTTOM. NO FURTHER RESISTANCE. RIH TO 9550'. ON BOTTOM. LOGGED HOLE WITH LWD: FORMATION EVALUATION (FE) FROM 9520' TO 9550'. ON BOTTOM. DRILLED TO 9585', SLIDING, AST=4.75 HRS. CIRCULATED AT 9750' MW: 0.0 VIS: 0 DRILLED TO 9750'. REACHED PLANNED END OF RUN - MAXIMUM HOURS ON BIT. CIRCULATED AT 9750'. RIH T/3000 MW: 0.0 VIS: 0 CBU. 150% HOLE VOL. POOH. DOWNLOAD MWD & CHANGE BITS. SERVICE WEAR BUSHING. MU BHA 39. RIH T/9130. REAM T/9215. RIH T/9750. DRILL T/9814. MWD FAILURE. CBU. OBTAINED 150% HOLE VOL. POOH T/235. PULL BHA REPAIR TOOL. RIH T/3000. POH TO 3600' MW: 0.0 VIS: 0 RIH TO 9146'. OBSERVED. REAMED TO 9283' ON BOTTOM. MWD REPAIRS COMPLETE. DRILLED TO 10100'_ REACHED PLANNED END OF RUN. CIRCULATED @ 10100'. HOLE SWEPT WITH SLUG. POH TO 9086'. TIGHT @ 9140'. RIH TO 10100'. WORKED THRU TIGHT SPOT @ 9140'. CIRCULATED @ 10100'. OBTAINED BOTTOMS UP. POH TO 3600'. RIH T/1650 MW: 0.0 VIS: 0 POOH DOWNLOAD MWD. SERVICE THE WEAR RING. RAN DP T/95'. PU MULE SHOE F/CEMENT'G AFTER GETTING APPROVAL T/P & A THE INTERVAL. RAN DP IN STANDS T/10100. CBU. TEST LINES T/3500 PSI. PUMP 20 BBLS OF H20. 72 BBLS OF CLASS G @ 17 PPG & 4 BBLS H20. DISPLACE W/54 BBLS MUD. PU DP T/8636. CBU OBTAINED 100% ANNULUS VOL. PULL DP T/SURF. TEST WELL CONTROL. WITNESSED BY LOU GRIMALDI OF THE AOGCC. TESTED T/5000. MU BHA #1 & RIH T/1650. QEC - 4 1995 WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 9 07/16/95 (36) TD: 9246' ( 0) 07/17/95 (37) TD: 9276'( 30) 07/18/95 (38) TD: 9397' ( 121) 07/19/95 (39) TD: 9530'( 133) 07/20/95 (40) TD: 9702' ( 172) 07/21/95 (41) TD: 9798' ( 96) 07/22/95 (42) TD: 9925' ( 127) 07/23/95 (43) TD: 9972' ( 47) STOP T/TAKE SURVEY MW: 0.0 VIS: 0 RIH T/8650. SINGLED IN DP T/8921. CBU & OBTAIN 150% HOLE VOL. DRILL CMT T/9086. CBU. OBTAINED 100% HOLE VOL. CONTROL DRILL THE K/O REACHED DEPTH PRIOR T/SIDETRACK, DRILLED T/9246. STOP T/TAKE BENCHMARK SURVEY. DRILLING MW: 0.0 VIS: 0 DRILL T/9246. WOULD NOT SLIDE, ROP DROPPED T/0 & STRING GOT HUNG UP. POOH T/217, CHANGE OUT MWD & BIT. INSTALL WEAR BUSHING MU BHA #2 TEST MWD & MOTOR. LD DP T/1631. PU 15 JTS OF HWDP & RIH T/9131. REAMED T/9246. TIGHT & PACKING OFF. DRILLED T/9276. SLIDING THROUGH A HARD STREAK, REPAIRING 2ND MOTOR. MAKE UP BHA #3 MW: 0.0 VIS: 0 DRILLED TO 9397'. POH F/ BIT AND BHA. CIRCULATED. HOLE SWEPT WITH SLUG. POH TO 228' NO HOLE PROBLEMS. PULLED BHA. TEST MOTOR AND MWD. DRILLING MW: 0.0 VIS: 0 BHA RUN #3. RIH TO 9264' NO HOLE PROBLEMS, RIH. TOOK MWD SURVEY @ 9264'_ LOGGED HOLE WITH LWD; FORMATION EVALUATION FROM 9300 - 9397'. DRILLED TO 9530'. DRILLING MW: 0.0 VIS: 0 DRILLED TO 9549'. CIRCULATED. HOLE SWEPT WITH SLUG. POH TO 219' NO HOLE PROBLEMS. PULLED BHA. DOWNLOADED MWD TOOL. CHANGE BIT, SURFACE CHECK MWD. RIH TO 9508'. WASHED TO 9702'. DRILLED TO 9702'. RIH T/6550 MW: 0.0 VIS: 0 DRILL T/9798. CBU. 100% ANNUL. VOL. POOH T/235. PULL BHA DOWNLOAD MWD TOOL. MU BHA #5. SLIP & CUT DL. RIH T/6550. DRILLED TO 9925 FT. MW: 0.0 VIS: 0 BHA RUN NO. 5. R.I.H. TO 9540 FT. REAMED TO 9798 FT. WASH & REAM 9540 TO 9798. BHA RUN NO.5 DRILLED TO 9925 FT. BHA RUN NO. 6 MW: 0.0 VIS: 0 BHA RUN NO. 5. DRILLED TO 9972 FT. BHA RUN NO. 5. CBU @9972 FT. OBTAINED BOTTOMS UP 100% ANNULUS VOLUME. BHA RUN NO. 5 POOH TO 235 FT. TIGHT HOLE 9540. PULLED BHA. TEST WELL CONTROL EQUIPMENT. TEST HYDRIL 250# 3500#, RAMS, LINES, VALVES 250# 5000#. WITNESS WAIVED BY BOBBY FOSTER AOGCC. BHA RUN NO. 6. BHA NO. 6 MADE UP. BHA RUN NO. 6. R.I.H. TO 9800 FT. BHA RUN NO. 6 MAD PASS 9800 TO 9972. WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 10 07/24/95 (44) TD:10026' ( 54) 07/25/95 (45) TD: 9602' ( 0) BHA RUN NO. 7 MW: 0.0 VIS: 0 BHA RUN NO. 6. LOGGED HOLE W/LWD: FORMATION EVALUATION FROM 9800 FT. TO 9972 FT. FINISH MAD PASS. BHA RUN NO. 6. DRILLED TO 10026 FT. BHA RUN NO. 6. CBU @ 10026 FT. OBTAINED BOTTOMS UP 100% ANNULUS VOLUME. BHA RUN NO. 6. POOH TO 235 FT. BHA RUN NO. 6 BHA RUN NO. 7 R.I.H. TO 9500 FT. BHA RUN NO. 7. TOOK MWD SURVEY AT 9507 FT. BHA RUN NO. 7 ATTEMPTING OPEN HOLE SIDETRACK @9582. DRILLED TO 9602 FT. BHA RUN NO. 1. DRILLED TO 9602 FT. MW: 0.0 VIS: 0 07/26/95 (46) TD: 9593' ( 0) 07/27/95 (47) TD: 9651' ( 58) 07/28/95 (48) TD: 9860' ( 209) 07/29/95 (49) TD: 10036' ( 176) DRILLED TO 9593 MW: 0.0 VIS: 0 BHA RUN NO. 2. POOH TO 229 FT. PULLED BHA. TEST WELL CONTROL EQUIP. BHA RUN NO. 2. R.I.H. TO 9507 FT. DRILLED TO 9593 FT. DRILLED TO 9651 FT. MW: 0.0 VIS: 0 BHA RUN NO. 2. DRILLED TO 9599 FT. CBU AT 9599 FT. OBTAINED BOTTOMS UP (100% ANNULUS VOLUME). POOH TO 229 FT. TIGHT HOLE 9185 TO 9246. BHA RUN NO. 2. PULLED BHA. BHA RUN NO. 3. RIH TO 9507 FT. BENCH MARK SURVEY. BHA RUN NO. 3. WASHED TO 9599 FT. DRILLED TO 9651 FT. DRILLED TO 9860 FT. MW: 0.0 VIS: 0 BHA RUN NO. 3. DRILLED TO 9860 FT. ROP DROPPED. COULD NOT SLIDE. BHA RUN NO. 3. POOH TO 229 FT. DOWNLOADED MWD TOOL. PULLED BHA. BHA RUN NO. 4. BHA NO. 4 MADE UP. RIH TO 9507 FT. BHA RUN NO. 4. DRILLED TO 9860 FT. DRILLED TO 10036 FT. BHA RUN NO. 4. DRILLED TO 10036 FT. MW: 0.0 ViS: 0 07/30/95 (50) TD:10092' ( 56) 07/31/95 (51) TD:10138' ( 46) DRILLED TO 10092 FT. MW: 0.0 VIS: 0 BHA RUN NO. 4. DRILLED TO 10036 FT. BHA RUN NO. 4. DRILLED TO 10058 FT. CBU AT 10058 FT. OBTAINED BOTTOMS UP 100% ANNULUS VOLUME. POOH TO 230 FT. PULLED BHA. BHA RUN NO. 5. RIH TO 9526 FT. BENCHMARK SURVEY. REAMED TO 9592 FT. RIH TO 10058 FT. DRILLED TO 10092 FT. RAN CASG. TO 5022 FT. MW: 0.0 VIS: 0 BHA RUN NO. 5. DRILLED TO 10138 FT. CBU AT 10138 FT. OBTAINED BOTTOMS UP 100% ANNULUS VOLUME. POOH TO 9050 FT. RIH TO 9282 FT. REAMED TO 9637 FT. RIH TO 10138 FT. CBU AT 10138 FT. OBTAINED BOTTOMS UP 100% ANNULUS VOLUME. POOH TO 187 FT. PULLED BHA. RUN CASG. TO 5022 FT. WELL : U-15A OPERATION: RIG : NABORS 18E PAGE: 11 08/01/95 (52) TD:10138' ( 0) 08/02/95 (53) TD:10052' ( 0) 08/03/95 (54) TD:10138 PB: 8898 08/04/95 (55) TD:10138 PB: 8898 08/05/95 (56) TD:10138 PB: 8898 RIH MW: 0.0 VIS: 0 RIH TO 9050 W/LINER. CBU ANNULUS VOLUME. FINISH IN HOLE TO BOTTOM 10138. CIRCULATE & WORK LINER. PULL OUT OF LINER. POOH LD RUNNING TOOL. TEST BOP HYDRIL 3500#. PU 41/8 ECONO MILL. RIH TO DRESS OFF LINER. RAN DRILLED IN STANDS TO 6700. MW: 0.0 VIS: 0 RUN DRILLPIPE 2 7/8" O.D. RAN DRILLPIPE IN STANDS TO 10052 FT. CBU AT 10052 FT. OBTAINED BOTTOMS UP 100% ANNULUS VOLUME. PERFORM INTEGRITY TEST. TESTED CASG. SUCCESSFUL. CBU AT 10052 FT. HOLE DISPLACED W/SEAWATER. 100% DISPLACED. PERFORM INTEGRITY TEST. TESTED CASG. SUCCESSFUL. POOH TO 180 FT. .AT BHA. POOH TO 0 FT. RAN DRILLPIPE TO 1450 FT. RAN DRILLPIPE IN STANDS TO 6700 FT. RUN TUBING MW: 0.0 RAN DP T/10050. RAN DP CONVEYED PERF. UNDERBALANCED. HU FLOW MANIFOLD T/OUTSIDE TANK. PRESS TEST LINES T/3000. SET PACKER. PRESS ANNUL T/2200. FIRE THE GUNS. FLOWED WELL & MONITORED FLUID LEVELS. REV. CIRC. 2 DP VOL. RELEASED PACKER & MONITOR THE WELL. WELL IS TAKING AVG OF 15 BPH SEAWATER. LD DP T/8649. RU & INSTALL 4.5" PIPE RAMS. LD GUNS. RETRIEVE WEAR BUSHING. RU T/RUN 4.5" TUBING. REMOVED HANGER PLUG MW: 0.0 RUN SINGLE COMPLETION, 4-1/2" OD. RAN TUBING T/8935' FINISHED RIH W/COMPLETION. SPACED OUT AND PICKED UP ~UBING HANGER. CIRCULATED AT 8930' TO CLEAN SEAWATER W/25 GAL/100 BBL NALCO/EXXON ECl CORROSION INHIBITOR. HOLE DISPLACED WITH SEAWATER - 100% DISPLACED. INSTALLED TUBING HANGER AND RILDS. SET PACKER AT 8889'. INSTALLED HANGER PLUG. INSTALLED TWO WAY CHECK VALVE. EQUIPMENT WORK COMPLETED, RUNNING TOOL RETRIEVED. ND BOP STACK. RIGGED UP TOP RAMS. INSTALLED 5" PIPE RAMS. TOP RAM IN POSITION. RD BOP STACK. INSTALLED ADAPTER SPOOL. INSTALLED ADAPTOR FLANGE AND TREE. REMOVED HANGER PLUG. R/U LUBRICATOR AND PULLED TWO WAY CHECK VALVE. RIG RELEASED 1330 HRS. 8/4/95 MW: 0.0 WELLHEAD WORK. REMOVED HANGER PLUG. EQUIP. WORK COMPLETED. PERFORM INTEGRITY TEST. RIGGED UP HIGH PRESSURE LINES. TESTED PERMANENT PACKER. PRESSURE TEST COMPLETED SUCCESSFULLY. FREEZE PROTECT WELL. COMPLETED OPERATIONS. WELLHEAD WORK. INSTALLED HANGER PLUG. INSTALLED BPV. RIG RELEASED 1330 HRS. 8/4/95 SIGNATURE: (drilling superintendent) DATE: BP Exploration U-15A Surveys 3,000' to 9'059' BP EXPLORATION (Alaska) [nc. Pad U 15A stot #15 Prudhoe Bay North Slope, Ataska SURVEY L ] ST [NG by Baker Hughes [NTEQ Your ref : MI~D <3000-9059'> Our ref : svy5011 License : Date printed : 7-Aug-95 Date created : 4-Aug-95 Last revised : 7-Aug-95 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on nTO 18 1.316,w148 54 52.756 Stot location is n70 18 0.275,w148 55 45.493 Slot Grid coordinates are N 5960478.350, E 632196.890 Slot local coordinates are 105.60 S 1808.96 W Reference North is True North BP EXPLORATION (Alaska) Inc. SURVEY LISTING Page 1 Pad U,15A yoUr ref : MI~ <3000-9059'> Prudhoe Bay,North Slope, Alaska Last revised : 7-Aug-95 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 100.00 0.70 16.63 100.00 0.58 N 0.17 E 0.70 200.00 0.11 349.66 199.99 1.26 N 0.33 E 0.60 300.00 0.15 9.03 299.99 1.49 N 0.34 E 0.06 400.00 0.28 16.54 399.99 1.85 N 0.42 E 0.13 0.00 Gyro Multi-Shot 0.18 0.34 0.34 0.43 500.00 0.63 34.26 499.99 2.54 N 0.80 E 0.37 600.00 0.85 34.75 599.98 3.90 N 1.54 E 0.22 700.00 1.35 34.18 699,96 5.19 N 2.62 E 0.50 800.00 1.84 60.18 799.92 6.96 N 4.68 E 0.86 900.00 0.79 62.04 899.90 8.08 N 6.68 E 1.05 0.82 1.55 2.64 4.71 6.71 1000.00 1.04 169.33 999.89 7.51 N 7.46 E 1.48 1100.00 1.68 183.66 1099.86 5.16 N 7.53 E 0.72 1200.00 1.90 181.83 1199.81 2.04 N 7.38 E 0.23 1300.00 2.17 182.07 1299.75 1.51 S 7.26 E 0.27 1400.00 2.33 177.42 1399.67 5.43 S 7.28 E 0.24 7.49 7.55 7.39 7.25 7.26 1500.00 2.77 162.04 1499.57 9.76 S 8.12 E 0.81 1600.00 3.71 145.60 1599.42 14.73 S 10.69 E 1.31 1700.00 3.99 134.71 1699.19 19.85 S 15.00 E 0.78 1800.00 4.26 125.59 1798.93 24.46 S 20.49 E 0.71 1900.00 4.51 119.78 1898.64 28.57 S 26.92 E 0.51 8.08 10.63 14.90 20.38 26.79 2000.00 4.56 118.71 1998.33 32.43 S 33.82 E 0.10 2100.00 4.85 111.84 2097.99 35.91 S 41.23 E 0.63 2200.00 4.66 107.33 2197.65 38.70 S 49.03 E 0.42 2300.00 4.63 107.51 2297.32 41.12 S 56.76 E 0.03 2400.00 4.61 105.22 2396.99 43.39 S 64.48 E 0.18 33.67 41.07 48.86 56.57 64.29 2500.00 4.48 103.79 2496.68 45.38 S 72.16 E 0.17 2600.00 4.94 100.59 2596.34 47.10 S 80.18 E 0.53 2700.00 5.56 99.61 2695.92 48.70 S 89.19 E 0.63 2800.00 6.43 99.46 2795.37 50.43 S 99.49 E 0.87 2900.00 7.79 98.01 2894.60 52.29 S 111.72 E 1.37 71.95 79.97 88.97 99.26 111.49 3000.00 9.90 96.66 2993.41 54.23 S 126.98 E 2.12 3050.00 9.99 97.14 3042.66 55.27 S 135.55 E 0.24 3127.00 7.50 95.60 3118.76 56.59 S 147.18 E 3.25 3219.00 6.70 95.90 3210.05 57.73 S 158.49 E 0.87 3312.00 6.50 95.60 3302.43 58.80 S 169.13 E 0.22 126.73 135.30 INTEQ MIJO 146.92 158.23 168.86 3404.00 6.50 94.50 3393.84 59.72 S 179.50 E 0.14 179.23 3497.00 5.50 96.60 3486.33 60.64 S 189.18 E 1.10 188.90 3589.00 5.40 96.30 3577.92 61.62 S 197.86 E 0.11 197.58 3681.00 5.40 97,30 3669.51 62.65 S 206.46 E 0.10 206.17 3774.00 5.40 81.20 3762.10 62.54 S 215.12 E 1.62 214.84 3867.00 5.30 58.00 3854.71 59.59 S 223.09 E 2.31 222.82 3959.00 5.90 24.60 3946.29 53.04 S 228.66 E 3.55 228.42 4050.00 8.60 13.30 4036.56 42.16 S 232.18 E 3.34 231.98 4143.00 10.90 5.20 4128.21 26.64 S 234.57 E 2.87 234.45 4237.00 12.30 5.60 4220.29 7.82 S 236.36 E 1.49 236.32 4329.00 13.80 5.90 4309.91 12.85 N 238.44 E 1.63 238.50 4419.00 13.80 7.00 4397.32 34.18 N 240.85 E 0.29 241.00 4511.00 15.70 7.30 4486.28 57.42 N 243.77 E 2.07 244.03 4603.00 18.30 5.20- 4574.25 84.16 N 246.66 E 2.90 247.04 4697.00 19.20 359.00 4663.27 114.31 N 247.73 E 2.32 248.25 All data is in feet unless otherwise stated Coordinates from slot #15 and TVD from RKB (Nabors 18E) (76.10 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 89.74 degrees. Declination is 29.14 degrees, Convergence is 1.02 degrees. calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (Alaska) Inc. Pad U,15A Prudhoe Bay, North Slope, Alaska Measured Depth 4792.00 4884.00 4975.00 5068.00 5163.00 SURVEY LISTING Page 2 Your ref : MI40 <3000-9059'> Last revised : 7-Aug-95 [nc[in. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Degrees Degrees Depth C 0 0 R D [ N A T E S Deg/lOOFt Sect 5259.00 5353.00 5443.00 5535.00 5628.00 20.00 355.40 4752.77 146.12 N 246.15 E 1.52 246.82 20.70 352.20 4839.03 177.92 N 242.69 E 1.43 243.49 20.80 352.90 4924.13 209.88 N 238.51 E 0.29 239.46 19.90 352.60 5011.32 241.97 N 234.43 E 0.97 235.52 20.10 352.90 5100.59 274.20 N 230.33 E 0.24 231.57 5723.00 5818.00 5912.00 6008.00 6102.00 20.10 353.30 5190.75 306.95 N 226.36 E 0.14 227.75 19.90 354.00 5279.08 338.90 N 222.81 E 0.33 224.34 19.40 352.20 5363.84 368.95 N 219.18 E 0.87 220.85 18.70 351.50 5450.80 398.67 N 214.92 E 0.80 216.73 17.70 350.50 5539.14 427.36 N 210.39 E 1.13 212.32 6198.00 6292.00 6386.00 6480.00 6573.00 17.30 350.10 5629.75 455.52 N 205.57 E 0.44 207.64 16.60 350.50 5720.62 482.82 N 200.90 E 0.75 203.09 16.60 350.50 5810.70 509.30 N 196.47 E 0.00 198.78 16.70 350.10 5902.68 536.42 N 191.84 E 0.16 194.27 16.90 351.20 5992.66 563.22 N 187.43 E 0.40 189.98 6668.00 6762.00 6854.00 6949.00 7044.00 7136.00 7230.00 7325.00 7420.00 7515.00 17.00 350.50 6084.50 590.86 N 182.98 E 0.24 185.65 17.10 354.30 6174.37 618.16 N 179.33 E 1.19 182.14 16.60 353.60 6264.33 645.26 N 176.46 E 0.57 179.39 16.30 353.60 6354.48 671.71 N 173.50 E 0.32 176.54 16.10 353.30 6443.79 697.49 N 170.54 E 0.23 173.70 16.10 352.20 6535.06 723.62 N 167.21 E 0.32 170.50 16.70 348.00 6625.24 749.74 N 162.64 E 1.41 166.04 16.20 349.10 6713.48 775.28 N 157.46 E 0.64 160.98 15.60 348.30 6804.84 800.80 N 152.36 E 0.67 156.00 14.90 348.30 6896.50 825.27 N 147.30 E 0.74 151.04 7608.00 7702.00 7797.00 7891.00 7986.00 14.20 347.30 6985.54 847.86 N 142.42 E 0.81 146.26 15.30 349.10 7076.45 871.28 N 137.54 E 1.27 141.49 14.70 348.70 7168.21 895.41 N 132.81 E 0.64 136.87 14.90 350.50 7260.06 919.28 N 128.43 E 0.53 132.60 14.80 350.10 7351.88 943.28 N 124.33 E 0.15 128.61 8080.00 8176.00 8270.00 8365.00 8432.00 15.40 350.50 7441.67 967.16 N 120.25 E 0.65 124.63 15.60 350.10 7532.25 991.92 N 116.01 E 0.24 120.51 16.60 351.90 7623.53 1017.94 N 111.90 E 1.18 116.52 16.20 351.90 7713.70 1044.21 N 108.16 E 0.42 112.90 16.20 351.20 7804.93 1070.43 N 104.27 E 0.20 109.13 16.80 352.20 7895.06 1096.85 N 100.42 E 0.71 105.40 17.00 351.90 7986.91 1124.48 N 96.56 E 0.23 101.66 18.00 352.20 8076.56 1152.48 N 92.65 E 1.07 97.88 17.70 352.20 8166.99 1181.33 N 88.70 E 0.32 94.06 17.52 353.26 8230.85 1201.44 N 86.14 E 0.55 91.59 8464.00 8495.00 8527.00 8557.00 8589.00 8619.00 8651.00 8682.00 8714.00 8745.00 19.83 359.06 8261.16 1211.65 N 85.48 E 9.25 90.98 21.66 5.45 8290.16 1222.60 N 85.94 E 9.38 91.49 22.66 7.28 8319.79 1234.60 N 87.28 E 3.80 92.88 23.63 6.14 8347.38 1246.31 N 88.66 E 3.56 94.31 24.37 7.53 8376.61 1259.23 N 90.21 E 2.91 95.92 25.35 11.36 8403.84 1271.66 N 92.28 E 6.28 98.05 25.93 17.10 8432.69 1285.07 N 95.69 E 7.97 101.52 26.37 26.17 8460.53 1297.73 N 100.72 E 12.96 106.61 26.84 32.86 - 8489.14 1310.18 N 107.78 E 9.47 113.72 28.01 45.81 8516.68 1321.14 N 116.80 E 19.57 122.80 Att data is in feet unless otherwise stated Coordinates from slot #15 and TVD from RKB (Nabors 18E) (76.10 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 89.74 degrees. Declination is 29.14 degrees, Convergence is 1.02 degrees. CalCulation uses the minim~ curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (ALaska) inc. Pad U,15A Prudhoe Bay, North SLope, ALaska SURVEY LISTING Page 3 Your ref : Midi:) <3000-9059'> Last revised : 7-Aug-95 Measured Inc[in. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 8776.00 28.70 53.21 8543.97 '1330.68 N 127.99 E 11.55 134.02 8808.00 28.93 60.53 8572.02 1339.09 N 140.88 E 11.04 146.96 8840.00 29.25 66.13 8599.99 1346.06 N 154.~7 E 8.56 160.88 8871.00 31.04 ?0.83 8626.80 1351.75 N 169.25 E 9.55 175.38 8902.00 34.28 75.11 8652.90 1356.62 N 185.24 E 12.83 191.40 8933.00 38.33 79.42 8677.88 1360.63 N 203.14 E 15.44 209.31 8964.00 41.03 82.19 8701.74 1363.78 N 222.68 E 10.41 228.86 8995.00 43.40 84.41 8724.70 1366.20 N 243.36 E 9.03 249.56 9028.00 45.68 86.61 8?48.22 1368.00 N 266.43 E 8.34 272.64 9059.00 48.13 88.43 8?69.40 1368.98 N 289.04 E 8.99 295.25 ALl data is in feet unless otherwise stated Coordinates from slot #15 and TVD from RKB (Nabors 18E) (76.10 Ft above mean sea level). Vertical section is from S 0.00 W 0.00 on azimuth 89.74 degrees. Declination is 29.14 degrees, Convergence is 1.02 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (ALaska) Inc. SURVEY LISTING Page 4 Pad U,15A yOUr ref : MIdO <3000-9059~> Prudhoe Bay,North SLope, ALaska Last revised : 7-Aug-95 Comments in wettpath MO TVO RectanguLar Coords. Coe~nent 0.00 0.00 0.00 N 0.00 E Gyro MuLti-Shot 3050.00 3042.66 55.27 S 135.55 E INTEQ Mid:) Att data is in feet unless otherwise stated Coordinates from slot #15 and TVD from RKB (Nabors 18E) (76.10 Ft above mean sea [ever). Bottom hole distance is 1399.16 on azimuth 11.92 degrees from wet[head. Vertical section is from S 0.00 W 0.00 on azimuth 89.74 degrees. Oec[ination is 29.14 degrees, Convergence is 1.02 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ SPERRY-SUN DRILLING SERVICES ANCHORAGE ALAS KA PAGE 1 SHARED SERVICES DRILLING PBU/U-15A 500292256500 ~'"~- f-~ '~ .... '~ ~ '~ ~ NORTH SLOPE BOROUGH .... COMPUTATION DATE: 8 / 8 / 95 DATE OF SURVEY: 073095 MWD SURVEY JOB NUMBER: AK-MW-50060 KELLY BUSHING ELEV. = 76.60 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/100 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERT. SECT. 9553 8916.63 8840.03 87 24 N 79.80 E .00 1446.84N 735.96E 9587 8918.43 8841.83 86 24 N 80.80 E 4.24 1452.44N 768.74E 9619 8921.05 8844.45 84 11 N 83.30 E 10.40 1456.85N 800.28E 9650 8923.57 8846.97 86 41 N 85.40 E 10.27 1459.96N 831.77E 9683 8924.05 8847.45 91 35 N 87.00 E 15.93 1462.11N 864.03E 786.01 818.96 850.64 882.21 914.53 9715 8921.48 8844.88 97 35 N 89.00 E 19.71 1463.22N 895.97E 9747 8916.58 8839.98 ** 5 S 89.60 E 8.98 1463.39N 927.39E 9779 8911.55 8834.95 97 54 S 89.00 E 7.08 1463.00N 959.18E 9811 8907.13 8830.53 97 41 S 88.90 E .68 1462.41N 991.44E 9843 8902.99 8826.39 97 11 N 90.00 E 3.76 1462.11N 1023.10E 946.49 977.90 1009.66 1041.87 1073.50 9875 8899.82 8823.22 94 5 S 89.60 E 9.71 1461.99N 1055.13E 9907 8898.02 8821.42 92 30 S 89.80 E 5.16 1461.83N 1086.29E 9939 8897.38 8820.78 89 48 S 89.70 E 8.40 1461.69N 1118.43E 9971 8897.77 8821.17 88 48 S 89.70 E 3.13 1461.52N 1150.38E 10003 8898.13 8821.53 89 54 N 90.00 E 3.55 1461.44N 1182.53E 1105.51 1136.64 1168.76 1200.68 1232.81 10018 8898.07 8821.47 90 35 S 89.80 E 4.71 1461.41N 1198.00E 10050 8897.76 8821.16 90 30 N 90.00 E .70 1461.36N 1229.95E 10059 8897.79 8821.19 89 5 S 89.50 E 18.22 1461.32N 1238.11E 10138 8899.03 8822.43 89 5 S 89.50 E .00 1460.63N 1317.10E 1248.27 1280.20 1288.35 1367.27 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 1966.77 FEET AT NORTH 42 DEG. 2 MIN. EAST AT MD = 10138 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 88.00 DEG. TIED INTO U-15 PB2 AT 9553.82' INTERPOLATED DEPTH 10138' SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/U-15A 500292256500 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 8/95 DATE OF SURVEY: 073095 JOB NUMBER: AK-MW-50060 KELLY BUSHING ELEV. = 76.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9553 8916.63 8840.03 10138 8899.03 8822.43 1446.84 N 735.96 E 637.19 1460.63 N 1317.10 E 1238.97 601.78 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUAI DRILLING SERVICES ANCHOR3~GE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/U-15A 500292256500 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 8/95 DATE OF SURVEY: 073095 JOB NUMBER: AK-MW-50060 KELLY BUSHING ELEV. = 76.60 FT. OPER3~TOR: BP EXPLOP~ATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTAi~GU~ COORDINATES MD-TI/I) VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9553 8916.63 8840.03 9593 8918.88 8842.28 1446.84 N 735.96 E 637.19 1453.48 N 775.34 E 674.94 37.75 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 1 SHARED SERVICES DRILLING PBU/U-15A PB1 500292256570 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 8/9 DATE OF SURVEY: 071895 MWD SURVEY JOB NUMBER: AK-MW-50060 KELLY BUSHING ELEV. = 76.60 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS INCLN DIRECTION DG MN DEGREES DG/100 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERT. SECT. 9059 8769.40 8692.80 48 5 N 88.40 E .00 9140 8819.20 8742.60 56 0 S 85.60 E 11.36 9171 8835.07 8758.47 62 24 S 85.40 E 20.65 9203 8848.23 8771.63 69 0 S 86.20 E 20.75 9234 8858.11 8781.51 73 48 S 86.30 E 15.49 1367.90N 288.90E 295.10 1366.16N 352.65E 358.84 1364.07N 379.18E 385.36 1361.94N 408.25E 414.43 1360.02N 437.56E 443.73 9267 8867.01 8790.42 74 54 S 85.60 E 3.91 9298 8874.80 8798.20 76 0 S 84.80 E 4.34 9330 8881.95 8805.35 78 11 S 85.00 E 6.90 9363 8887.70 8811.10 81 41 S 85.20 E 10.62 9394 8891.61 8815.01 83 48 S 85.90 E 7.14 1357.78N 469.25E 475.41 1355.27N 499.15E 505.30 1352.49N 530.22E 536.35 1349.72N 562.59E 568.70 1347.33N 593.24E 599.35 9426 8894.24 8817.64 86 48 S 88.60 E 12.59 9455 8895.68 8819.08 87 30 N 87.90 E 12.29 9487 8896.54 8819.94 89 24 N 87.20 E 6.33 9509 8896.24 8819.64 92 11 S 89.50 E 19.67 9540 8894.05 8817.45 95 54 S 86.20 E 15.97 1345.81N 625.09E 631.19 1345.98N 654.05E 660.15 1347.35N 686.00E 692.11 1347.79N 707.99E 714.10 1346.63N 738.88E 744.98 9573 8891.17 8814.57 94 5 S 85.40 E 5.97 9605 8889.86 8813.26 90 35 S 84.10 E 11.67 9637 8890.42 8813.82 87 24 S 83.00 E 10.57 9669 8892.59 8816.00 84 48 S 82.30 E 8.41 9698 8895.90 8819.30 82 5 S 82.60 E 9.37 1344.23N 771.66E 777.75 1341.30N 803.49E 809.57 1337.71N 835.28E 841.34 1333.62N 866.94E 872.99 1329.84N 895.50E 901.53 9730 8901.24 8824.64 78 41 S 83.40 E 10.91 9762 8908.35 8831.75 75 35 S 82.80 E 9.86 9794 8917.07 8840.47 72 48 S 82.50 E 8.80 9826 8927.35 8850.75 69 41 S 81.10 E 10.54 9858 8939.26 8862.66 66 35 S 80.00 E 10.20 1325.99N 926.81E 932.82 1322.25N 957.78E 963.77 1318.31N 988.32E 994.29 1313.99N 1018.31E 1024.26 1309.12N 1047.60E 1053.53 9890 8951.81 8875.21 67 11 S 79.70 E 2.06 9922 8963.77 8887.17 68 54 S 79.90 E 5.34 9954 8974.88 8898.28 70 30 S 79.60 E 5.08 9986 8985.13 8908.53 72 5 S 79.40 E 5.03 10017 8994.22 8917.62 73 48 S 79.70 E 5.56 1303.93N 1076.57E 1082.48 1298.68N 1105.78E 1111.66 1293.34N 1135.31E 1141.17 1287.81N 1165.11E 1170.94 1282.44N 1194.25E 1200.06 10050 9002.93 8926.33 75 35 S 79.40 E 5.52 10101 9014.41 8937.81 78 22 S 78.90 E 5.53 1276.66N 1225.55E 1231.33 1267.31N 1274.35E 1280.09 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. AT NORTH 45 DEG. 9 MIN. EAST AT MD = 10101 VERTICAL SECTION RELATIVE TO WELL HEAD 0lC-4 199 VERTICAL SECTION COMPUTED ALONG 89.74 DEG. A~as~ ~i a Gas Cons. Co~ TIED IN AT 9059' INTERPOLATED DEPTH 10101' SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/U-15A PB1 500292256570 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 8/95 DATE OF SURVEY: 071895 JOB NUMBER: AK-MW-50060 KELLY BUSHING ELEV. = 76.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9059 8769.40 8692.80 10059 9005.13 8928.53 10101 9014.41 8937.81 1367.90 N 288.90 E 289.60 1275.05 N 1234.13 E 1053.87 764.27 1267.31 N 1274.35 E 1086.59 32.72 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE S~RED SERVICES DRILLING PBU/U-15A PB1 500292256570 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 8/95 DATE OF SURVEY: 071895 JOB NI/MBER: AK-MW-50060 KELLY BUSHING ELEV. = 76.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9059 8769.40 8692.80 1367.90 N 288.90 E 289.60 9069 8776.60 8700.00 1368.21 N 296.71 E 293.02 3.42 9305 8876.60 8800.00 1354.60 N 506.59 E 429.09 136.07 9959 8976.60 8900.00 1292.46 N 1140.11 E 982.57 553.49 10101 9014.41 8937.81 1267.31 N 1274.35 E 1086.59 104.02 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/U-15A PB2 500292256571 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 8/9 DATE OF SURVEY: 072395 MWD SURVEY JOB NUMBER: AK-MW-50060 KELLY BUSHING ELEV. = 76.60 OPER3~TOR: BP EXPLOP~ATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9059 8769.40 8692.80 48 5 N 88.40 E .00 1367.90N 288.90E 9139 8820.72 8744.12 52 5 N 84.60 E 6.19 1371.70N 350.12E 9171 8839.75 8763.15 54 54 N 82.70 E 9.97 1374.56N 375.68E 9210 8860.81 8784.21 59 42 N 81.30 E 12.67 1379.13N 408.17E 9242 8875.93 8799.33 63 54 N 79.10 E 14.45 1383.94N 435.95E 453.45 514.68 540.40 573.20 601.36 9274 8888.67 8812.07 69 11 N 77.00 E 17.62 1390.03N 464.66E 9306 8898.23 8821.63 76 0 N 76.50 E 21.30 1397.03N 494.36E 9338 8904.74 8828.14 80 30 N 76.80 E 14.09 1404.26N 524.84E 9363 8908.14 8831.54 84 24 N 78.40 E 16.29 1409.76N 549.86E 9395 8910.20 8833.60 88 5 N 78.40 E 11.71 1416.09N 580.73E 630.59 660.93 692.06 717.57 748.98 9428 8911.51 8834.91 87 24 N 78.70 E 2.29 1422.68N 613.23E 9458 8912.83 8836.23 87 35 N 78.80 E .74 1428.59N 642.93E 9490 8914.06 8837.46 88 0 N 78.70 E 1.29 1434.82N 674.26E 9522 8915.28 8838.68 87 35 N 78.70 E 1.25 1441.06N 705.52E 9553 8916.63 8840.03 87 24 N 79.80 E 3.60 1446.84N 735.96E 782.04 812.24 844.09 875.88 906.80 9587 8917.42 8840.82 89 54 N 81.40 E 8.94 1452.26N 768.70E 9619 8916.38 8839.78 93 48 N 82.00 E 12.27 1456.90N 800.49E 9650 8913.90 8837.30 95 11 N 82.80 E 5.11 1461.06N 831.65E 9682 8911.03 8834.43 95 11 N 82.60 E .63 1465.08N 863.01E 9713 8908.61 8832.01 93 35 N 82.10 E 5.32 1469.26N 894.15E 939.96 972.08 1003.51 1035.12 1066.55 9743 8906.97 8830.37 92 48 N 82.00 E 2.74 1473o32N 923.21E 9779 8905.12 8828.52 93 5 N 83.70 E 4.80 1477.78N 958.82E 9809 8903.64 8827.04 92 31 N 84.40 E 3.01 1480.91N 988.81E 9840 8901.96 8825.37 93 36 N 84.20 E 3.54 1484.01N 1019.90E 9873 8899.42 8822.82 95 18 N 84.30 E 5.16 1487.29N 1052.43E 1095.89 1131.77 1161.92 1193.16 1225.'84 9907 8896.02 8819.42 96 18 N 84.60 E 3.10 1490.52N 1085.73E 9939 8892.79 8816.19 95 18 N 83.80 E 4.00 1493.74N 1117.37E 10026 8884.77 8808.17 95 18 N 83.80 E .00 1503.08N 1203.32E 1259.28 1291.08 1377.53 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 1925.41 FEET AT NORTH 38 DEG. 40 MIN. EAST AT MD = 10026 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 83.00 DEG. TIED INTO U-15A PB1 AT 9059' INTERPOLATED DEPTH 10,026' ©EC -4 1995 Oas Cons, Commission Anchorage SPERRY-SUN DRILLING SERVICES ANCHOR3tGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/U-15A PB2 500292256571 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 8/95 DATE OF SURVEY: 072395 JOB NUMBER: AK-MW-50060 KELLY BUSHING ELEV. = 76.60 FT. OPERATOR: BP EXPLOR3ITION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9059 8769.40 8692.80 10026 8884.77 8808.17 1367.90 N 288.90 E 289.60 1503.08 N 1203.32 E 1141.23 851.63 .. THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CIIRVATIIRE METHOD. SPERRY-SUN DRILLING SERVICES ANCHOR3%GE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/U-15A PB2 500292256571 NORTH SLOPE BOROUGH COMPUTATION DATE: 8/ 8/95 DATE OF SURVEY: 072395 JOB NUMBER: AK-MW-50060 KELLY BUSHING ELEV. = 76.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9059 8769.40 9069 8776.60 9243 8876.60 9279 8890.40 8692.80 1367.90 N 288.90 E 289.60 8700.00 1368.07 N 296.82 E 293.10 3.50 8800.00 1384.28 N 437.52 E 367.13 74.03 8813.80 1391.09 N 469.23 E 388.60 21.47 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS ! STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend , Operation Shutdown __ Re-enter suspended well ~ Alter casing __ Repair well __ Plugging X Time extension __ Stimulate __ Change approved program __ Pull tubing __ Vadance __ Pedorate __ Other Plugback for Redrill 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) BP Exploration Development x KBE = 76 feet Exploratory __ 3. Address Stratigraphic ~ 7. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 Service __ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 5173'NSL, 1809' WEL, SEC. 19, T11N, R13E, UM At top of productive interval 4328' NSL, 3324' WEL, SEC. 20, T11N, R13E, UM At effective depth N/A At total depth 4310' NSL, 3255' WEL, SEC. 20, T11N, R13E, UM U-15 (21-20-11-13) 9. Permit number 95-78 10. APl number 50- 029-22565 11. Field/Pool Prudhoe Bay Field/Off Pool 12. Present well condition summary Total depth: measured true vertical 10405 feet 9228 feet Plugs (measured) Effective depth: measured true vertical feet Junk (measured) feet Casing Length Structural Conductor 80' Surface 3006' Intermediate Production Liner Perforation depth: measured None true vertical Size Cemented Measured depth 20" 260 sx Arcticset (Approx) 110' 10-3/4 · ~42,~ cs//u375,~'~'/~28,~ cs/// 3036' JU~I £6 ~995 Tubing (size, grade, and measured depth) None Gas Cons. Commission Ancho:~. :' Packers and SSSV (type and measured depth) None True vertical depth 110' 3029' 13. Attachments Description summary of proposal × Detailed operations program BOP sketch 14. Estimated date for commencing operation June 25, 1995 16. If proposal was verbally approved Name of approver B. Wondzell 6/24/95 Date approved 15. Status of well classification as: Oil X Gas Suspended__ Service 17. i hereby certify that the ~,~g~,oinjg, ls true and correct to the best of my knowledge. 'P.~/~.. '~~J~"J,~s' Signed /~ //~ ~ Title Drilling1 Engineering1 Supervisor ' -[ (../ FOR COMMISSION USE ONLY Conditions of approval: Not'l~ Commission so represer~tative may witness Plug integrity_ BOP Test__ Location clearance ~ Mechanical Integrity Test ~ Subsequent form required 10- J Approval No.C)/"~A-'~---/~ ~ Approved by order of the Commission /~'-~/~J~ Commissioner Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE AlaSKA OIL AND GAS CONSERVATION CO~IMISSION TONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 June 26, 1995 Terry T. Jordan Drilling Engineer Supervisor BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit U-15A BP Exploration (Alaska) Inc. Permit No.- 95-97 Sur. Loc. 5173'NSL, 1809'WEL, Sec. 19, TllN, R13E, UM Btmnhole Loc. 1351'NSL, 326'WEL, Sec. 18, TllN, R13E, UM Dear Mr. Jordan~ Enclosed is the approved application for permit to redrill the above referenced The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Commissioner BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. - STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.°05 la. Type of work Drill [] Redrill Dllb. Type of well. Exploratory[] Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenCII Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE=76 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. 0. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28283 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) - 5173' NSL, 1809' WEL, SEC 19. T11N, R13E, UM Prudhoe Bay Unit At top of productive interval 8. Well number Number 1347'NSL, 1805 WEL, SEC 18, T11N, R13E, UM U-15A'(43-18-11-13) - 2S100302630-277 At total depth 9. Approximate spud d;te Amount 1351' NSL, 326' WEL, SEC 18, T11N, R13E, UM June 26, 1995 $200,000.00 12. Distance to nearest i13. Distance to nearest well 14. Number of acres in property15. Proposed depth(uDandTVD) property line ADL28282 3928' feet U-08: 51'at3507' feet 2560 10300'/8923' feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 Kickoff depth ao36 feet Maximum hole angle 6~ o Maximum surface 2850 psig At total depth (TVD) 8800'/3642 psig 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 9-7/8" 7-5/8" 29.7# ' NT95HS NSCC 8672' 28' 28' 8700' 8478' 9-7/8" 7-5/8" 29.7# 13Cr-8O NSCC 383' 8700' 8478' 9083' 8779' 265 sx Class 'G' 6-3/4" 4-1/2" 12.6# 13Cr-8O NSCT 1367' 8933' 8677' 10300' 8923' 260 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 10405 feet Plugs (measured) true vertical 9228 feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor 80' 20" 260 sx Arcticset (Approx) 110' 110' Surface 3006' 10-3/4 .... ~"~'~'~-. ~" ~ \l ~'_ U 3036' 3029' Intermediate Production Liner JU~ '~ cO Perforation depth' measured None true vertical ~?,~2, 0ii & G_p,s Cor~s. Co 20. Attachments Filing fee [] Property plat [] BOP Sketch [] A~Di~Cb'rter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth pict [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirementsl-I 21. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ Signed ~4~/ ¢ ~ Title Drilling Engineer Supervisor Date ~'/Z/~J' ! /~ Commission Use Only PermjJ, Number IAPI number IApproval d_ate ~.., ISee cover letter ~',~'"... ?./~ 150- o ~..~'-..~. ~-.~',.~"-O/' I ~,-.~,~--~._~ Ifor other requirements Conditions of approval Samples required [] Yes [] No Mud Icg required []Yes [] No Hydrogen sulfide measures ~ Yes [] No Directional survey required ~ Yes [] No Required working pressure0~orBOPE I--12M; CI3M; ~5M; Cll0M; I-I15M; Other: R[rG~NAL SIGNED-BY by order of Approved by -'RUSSE~ A. DOUGLASS Commissioner me commission Date [ [icate Form 10-401 Rev. 12-1-85 Submit I WellName: ]U-15APBU Well Plan Summary Type of Well (producer or injector): I Producer Surface Location: 5173' FSL 1809' FEL Sec 19 TllN R13E UM Target Location: 1347' FSL 1805' FEL Sec 18 TI 1N R13E UM Bottom Hole Location: 1351'FSL 326'FELSec 18 TllNR13EUM I AFE Number: 14P0702 I Estimated Start Date: ] June 26 1995 I Rig: I Nabors 18E I Operating days to complete: I 15 IMD: I 10300' I Well Design (conventional, sHmhole, etc.): Formation Markers: I RT-GL 1 29.5'I I KBE: 76.7' High Angle Slimhole Producer Formation Tops MD TVD (BKB) IKRU/LCU 7413' 7253' Top Sag River 9083' 8779' 7-5/8" casing point Top Shublik 9223' 8847' Top Sadlerochit 9397' 8890' Target 9397' 8890' Total Depth 10300' 8890' I I Casing/Tubing Pro gram: Hole Si'~e Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 30" 20" 91.5# H-40 Weld 80' 30730' 1107110' 13 1/2" 10-3/4" 45.5# NTSOLHE Butt 3006' 29729' 3036'/3029' 9 7/8" 7-5/8" 29.7# NT95HS NSCC 8672' 28'/28' 870078478' 9 7/8" 7-5/8" 29.7# 13Cr-80 NSCC 383' 8700'/8478' 9083'/8779' 6 3/4" 4-1/2" 12.6# 13Cr-80 NSCT 1367' 8933'/8677' 1030078923' Tubing 4 1/2" 12.6# 13Cr-80 NSCT 8823' 27'/27' 8850'/8610' Logging Program: I Open Hole Logs: 9-7/8" Hole 6-3/4" Hole I Cased Hole Logs: 7 5/8" Casing 4 1/2" Liner MWD Directional MWD Directional GR/Resistivity , None None Well Plan Summary Page 1 Mud Program: Special design considerations Up to 150 psi overpressure is possible inthe Ugnu from Cretaceous water injection. It is probable that a mud weight of 9.7 - 10.0 ppg will be needed through this sectiom .- Intermediate Mud Properties: ]LSND WBM Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.8- 9.0 35-40 8- 12 3- 6 8- 10 9- 10 8- 12 to to to to to ~ to to 9.8- 10.0 45- 50 10- 15 6- 8 10- 15 9- 10 <15 HPHT Production Mud Properties: ] Ho-Pro Xanvis Pobrmer Mud Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.8 50 30 18 20 8 6 tO tO tO tO tO tO tO 9.2 60 50 23 30 10 8 NOTE: Keep annular velocities around drill pipe at or above 220 fffmin wherever possible. Directional: I KOP: 1 3036' Maximum Hole Angle: ] 88 degrees Close Approach Well: U-8 at 3507' (51' away) The above listed wells will be secured during the close approach. Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, B OPE and drilling fluid system schematics on f'fie with AOGCC. Gas O0ns. 80mmissi0n Well Plan Summary Page 2 PROPOSED DRILLING AND COMPLETION PROGRAM WELL U-15A [43 - 18 - 11 - 13] PBU . Notify an AOGCC representative prior to commencing plug-back operatiOns. RU BJ. RIH open ended to 10405' MD (TD of well). Lay a balanced cement plug from 10405' MD to 9630' MD. This will leave cement about 300' above the top of the Sag River (upper most hydrocarbon bearing zone). - . With an AOGCC representative on location to witness the operation, tag the top of the cement to ensure sufficient cement is in place. -~ . POOH to 3300'. Lay balanced kick-off cement plug from 3300' MD to 2900' MD (+/- 100' into the 10-3/4" casing). POOH and prepare to commence sidetracking operations. . Directionally drill 9-7/8" hole to top Sag River. Run a 7-5/8", 29.74/, NT-95 NSCC by 7- 5/8", 29.7#, 13Cr-80 NSCC casing string and cement with Class G cement around the 7- 5/8" shoe. The annulus will be freeze protected with dry crude. Test casing to 3500 psi. . Drill out of 7-5/8" casing with a mud weight of at least 0.5 ppg over the highest anticipated mud weight to used while drilling 6-3/4" hole for formation integrity test. Displace well to Flo-Pro. Directionally drill the 6-3/4" hole to TD. Run 4-1/2", 12.6#, 13 Cr-80 NSCC liner from TD to 150' inside 7-5/8" casing shoe and cement using Class G cement. o Clean out to 4-1/2" float equipment. Change over to filtered seawater completion fluid. Test casing and lap to 3500 psi. 7. RIH with 2-3/4" perforating guns and perforate as required. . Run 7-5/8" production packer on the 4-1/2", 12.6#, 13Cr-80 NSCT tubing, such that the tubing tail is above the Sag River. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Freeze protect the tubing and annulus with Diesel from surface to 2200' TVDBKB. Set and test packer. Fluids incidental to the drilling of a well will be injected down CC-2A. Tubing Size: 4-1/2", 12.6 # NT 13Cr-80 tubing with 6 GLM's. Well Plan Summary Page 3 Anticipated Bottom Hole Pressure Maximum Anticipated Surface Pressure planned Completion Fluid 3642 psi @ 8800' TVDSS 2850 psi 8.6 ppg filtered sea water Notes: a. The drilling fluid program and surface system will conform to the regulations set forth in 20AAC25.003. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10 psi/fO. c. Based on previous logs on U Pad, no hydrocarbon zones are anticipated above the Sag River. .~ d. No potential hazardous levels of H2S are anticipated in this well. e. Drilling hazards: · Previous wells have experienced losses into a small sand at around 4500' TVD. The sand is believed to be discontinuous with a small capacity and losses have cured themselves. · The Cretaceous may be affected by GC2 injection and overpressures of up to 150 psi are possible at around 4600' TVD. b, Well Plan Summary Page 4 7-5/8" INTERMEDIATE CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 7-5/8" CIRC. TEMP: 140°F PREFLUSH: 20 bbls fresh water SPACER: 70 bbls BJ MCS-4 Spacer weighted at current mud weight. WEIGHT: 15.8 ppg APPROX. # SACKS: 265 FLUID LOSS: 100-150 cc/30 minutes LEAD CEMENT TYPE: None TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1 ghs FP-6L YIELD: 1.14 fi3/sx MIX WATER: 4.85 gps THICKENING TIME: 3-1/2 to 4-1/2 hfs FREE WATER: 0 cc CENTRALIZER PLA CEMENT: 1. Run 2 Turbulators per joint to 300' MD above top of Sadlerochit. 2. Run 1 solid body 7-3/4" 'x 9-1/4" centralizer or turbolator on the first 2 joints inside the 10- 3/4" surface casing shoe. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Batch mix tail slurry. CEMENT VOLUME: 1. Tail slurry to 1000' MD above top of Sag River with 30% excess. 2. 80' MD 7-5/8", 29.7# capacity for float joints. Note: There are no hydrocarbon bearing zones above the Sag River Well Plan Summary Page 5 4-1/2" PRODUCTION CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 4-1/2" CIRC. TEMP: 140°F PREFLUSH: 20 bbls fresh water SPACER: 70 bbls BJ MCS-4 Spacer weighted at current mud weight. TAIL CEMENT TYPE: CLASS G ADDITIVES: 150 ghs BA-86L + 0.25% FL-33 + 0.6% CD-32 + 0.2% A-2 + 0.5% Gel + 1.0 ghs FP-6L WEIGHT: 15.7 ppg APPROX. # SACKS: 260 FLUID LOSS: <50 cc/30 minutes YIELD: 1.17 ft3/sx MIX WATER: 3.58 gps THICKENING TIME: 45 min @ surface + 3 hrs FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1. Run 2 Turbulators per joint. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 5 to 7 bpm. Batch mix tail slurry. CEMENT VOLUME: 1. Tail slurry from TD to 7-5/8" casing shoe with 30% excess. 2. 150' Liner lap. 3. 200' above the liner top 4. 80' Float shoe. Well Plan Summary Page 6 ,,~CHORAGEE TE~.~_907-349-8176 Jun 25,95 9:26 No.O01 P.04 ...... ~ ~._. ~ ................. -?~.-. ~?>- ~'~':~" .: SHARED SERVICE DRI.LLIN ~ .... .,,Ina~/',~l] $c'l?lO~bee er' , , I .... Hark. er Zclentlf~cetJon ND ' BK8 SECTN 1[NCL. N Al TIE-IN/OflOP 3/t00 3036 30~ 134 9.50 el ENO. 3/IO00ROP 3186 3178 153 5.00 cI CURVE 3/100 368~ 3678 · t96 5,00 ~ ............... O) ENO 31100 CURVE 4043 403l ~t§ 9.56 , E)' BUILD 1.48/100 4043 .403t ~.15 9.56 ' F) CURVE 3/100 . 4570 .4543 ~.2g t7 35 s Gl 'ENO 1,48/100 tSlJILD 4570 4§43 .' E;~9 17.3§ I .L.. ' N) ENO 3/~00 CURVE 4714 4680 ~9 17,$3 ! ~ I) CURVE 10/100 8536 83~3 77 17.63 ! ~ J) ---~.---TARGET ....... 9440 8893 630 88.00 ~ K) ENO 10/100 CURVE 9440 8893 630 88,00 r ......... ~: .. LI 1~. ~0300 8g~$ 1490 88.00 · ,, .... ~i_ · __ _ , · ' .:. · .. · · · , · .. i- - %',,~__ . ~i.. '," i. '-~ ~-".'-:.. .... .................. .,.... . .- .............. ~ · ........... " " - , ' .,',' )~.:.,,.' .:i.'.. :'" · ,, NOT ~,PP~O~ ~'--~""'""~ '"" · ,,.~.~ '""'~'~' . ",,, pb ~ ~ ,~ &.".. ': ........... ~: ~'. ~ . . ..~ ~ ....... . .. · . ~ - ,%:-. ~ - . ~ .., · .: · · .' · · :..; o . .. ~ ._. ,, "'~ · '~' .5'_ -_ "' ',' - ·.. · . . · · . · ,'~ .... · .. · .'.. · '~'"" '",,, Rt'CEIVED ' ~ ' , ,,..~ .... ,:.,.~...,.,,,:.~:... ... --~y:(,'~i.~.'.' ....... · q ~ "~'~L,:~ "' :.:,j.~,. ~ :~ .. ..: ~ ,. :.,, :,...~ ...~.:.....:.~ ', ! ':~1~' ~' -~ ri ..... .I- ...... -L ...................... · · . . . I I, ,, -, 0 600 t~00 ~800 ~400 3000 3600 4aO0 4800 5400 6000 6600 Section De ~tu~e [Ar~J).~ lc) ,9..3 I,U~Tt"~; 8J,52 .~);,,~..AN ,],) ...... ', " - I U-15ST VERTTCAI.:. SECT.T:ON' VT'E.W at: 89,74 ' ' "' TvD Scale.' 1 inch.- J200 feet K Oep Scale.' ~ inch - q.~O0 feet .,,CHORRGEE TEL-"<.10?-349-81'?6 .. .. 3un 2.5..._,.95 9:27 No....O01 P.05 , , · -- I I mi I1 _ '-= .....El I I F ~1 I I SHAR.,,ED SERV'ICES ORIL iNG I~rken Identtftcaf. ton HD N/S E/H · ~."' ~'.;'.'-.'".. ;: ': l) TIE-IN/OROP 3/t00 3036, 53 13t ~ ."i i :': '"::":';" E) BUILD 1.4e/loo 4043 3a ;~ CLOSU~ ' 2080 feet at .AZtmuth 45,49 F) CURVE 3/~00 4570 a9 6) END t.46/t00 BUILD 4570 89 aZ9 DECLINATION' 29.135 E .. H) END 3/tO0 CURVE 4714 ~32 ~Z8 SCALE; ' t inch = 300 ~eet 1) CURVE ~0/~00 ~36 1278 J) ....... TARGET ....... 9440 t454 62~ DRAgN ' 06/25/95 ..,,. -. . .. K) END ]0/100 C~VE 9440 S454 624 .. L) TO tO300 145B t483 ' · Anadr~ ]] SchIU~b~gec' .. ~ .., .' 1950 .............. · .. .. .. · ... · . ~ann- - - ............ . ~ ' . . . . . . , 1350 ........... ~ .- -' . , t~00 ..... ., ~r .... "r;.,: ... .. ,,, ,... . ,7. ~, ,. .., ~.,,.~ j[ ',. ', '..' '.;. ' I_. . ~ .. ,..... 600: _ ....... · . · · . . · ......... ~ ~ I~ . , ,. , ........ ¢~."":;'" ',~ :*'. a'..' ". · _,~,, ~.~:~]~-,......,-. '" . .,. -.~. '~}~ I ~ ..... . ,, . ~ ....... .,,.~ ~. t~ 0 150 ~0' 4~ 600 750 900 1050 !~0 .' .' I~ ~:;::~':.!~)~. :?.~t~, ...:.c'. ' ' ' '~ ' i~' 'r~.;~'~ I ~ I (AneArill (C)93 UISSlPb BJ,5~ I0; Ii AN IJ '" ' ... · - ·, I. ,. · , , ..... . , . · ¢ .1:..: RECEIVED /~laska Oil & Gas Cons. CommissiOn #ell ......... : U-155T (pS) Field ........ : PRUDHO~, U-PAD .C .omloutation..: MINIMUM CURVATUR~ .... .. ' Surface L,o~.: 148.92930354 W Legal Description Surface ...... : 5173 F~L 1809 F~ Tie-/n/KOP...: 5120 FSL 1675 PEL Target ....... : 1347 FSLI180 FEL BHL. ' ~: 1351 FSL 321 FEL ,,. - . · . ?z~:-~/~p 3/-~0o ~o~ -. .- 3100 ' ~' ~ ..... "" 3700 ~.:.'~:f-~.~- ' c.. ":. :.~:~.~',:.: . ,. / ~.~.'. :' '-'. ~"'S:~.' v~ . - :.- ,'~~~.~'~ -~:~."'~ -~.r~' - ~? ff.'- :~.~t~'.. . ~:~'/~:. '.::~ ,...- .'. ::;: ~:.. e:,. 4ooo " ~' ~:'.-: : ~c..c -.:~-.~I~:-.i./':.. -.* ~ '3Z~~: ~ : 4043 :~ . .~ .' ~-' -~~:~-;~s~ - 4o~ - · .'~ '): ':',i:- .'.-~-:--' ' ' .... ~.~:.~ '~.: : ._ .: l.~:::,.:.c,:. ..... . 4109. ,'. '~ .,--' ' ' ' ' ' ~~~~.'J ' .. -. 2 : . . . 9.50 '7.58 $.00 5:00 · ,% 97 -. . "--' 6~09.. '.. .-!-'.~';/~. zo.40 -11~8.8...,:. 13,36 - 14,84 Anadrill Schlumberger Alaska District 1111 East 80th Avenue Anchorage, AK 99518 (907) ]4~-4511 Fax 349-2487 DIRECTIONAL WELL P~AN for SHA~ SEKVICES DRILLI~ LOCATIONS - A]~ Zone: 4 X-Coord S19 TllN ~13E UM 632196.89 5960478.35 S19 "/'11N'R.,13E1]M 632332.02 5960427.77 S18 TllN'R.13E13M 632795.00 5961943.00 S18 Tll_R'R13E TIM 633654.00 5961962.00 PROPOSI~D WELL PROPILE DI~ON VEHT-DEPT~ SgCT - . 97.18 3029 2951 134 97.18 3092 3014 143 97.18 3178 3100 153 97.18 3672 *359% 196~ 91.:48 3690 3612 197 ANADRILL 52.95 S 134.23 E 54.14 ~ 143.65 H 55.32 S Z52.98 ~ so.73 ~ 196.9o g 60;84 8 197.41 E 58~61.-~- 204.80 'B 5i.49f~-:'210.33 E 3~.'.4.9.":~'-..2~3.'90 g 3~;~5'--.~.. 2x4.-~ 32.64 .S' 2i4.96 .: · 2~.o3 ~,' 2~6.o9 3.e4.s. 2z8.29 ~:.~ :~' 220.;~ 42,0; ~ 223.54 Prepared ..... : 06/25/95 Section at...: 89.74 KB elevation.: 77.80 ft Magnetic Dcln 29.135 E Scale Factor.: 0.99991985 Cpnv_erc.:.:jence..: +z. 00804303 AKA-DPC FEASIBILITY PLAN NOT APPROVED FOR EXECUTION, PLAN # STATE-PLANE X Y 632332.02 5960427.77 632341.46 $9g0426.75 632350.81 5960425.74 632393.81 5960421.08 632395.32 59~,04.20..99 : '632402;-68:596.04~2~;36 ;se ~324i2 ~2~ S~44~.29 622422.~e 59GOd49'.30 . . e324~3.33 5960.4'56.!3 '~.". .632415.19 596047=0635. e324i?.29 596os00.2o' 632419.64 5960524.34 FACg 100 LS . · L~ 3.00 3.00 118L O. O0 l12L 3. O0 . ~,~. - 3.00 : '.~'-*:; 3. O0 · o I~ · '* · 32L~ ::3.00 ..¢.- ~-. - ~.';::. }.3.o~ ..-'~. 1.48 1.48 1.48 1-48 .m U-15ST (Pi;) 06/25/9.5 Pacje 2 PROPOSED WE'LL PROFILE c, umts ~/zoo 10/100 4500 16.31 4570 17.35 4870 17.35 4600 17.32 4700 17.56 4714 17.63 7413 17.63 8536 17.63 8600 17.88 8700 22.19 8800 29.30 8900 37.66 9000 46.59 9083 54,27 9100 55.81 TOP SH~BbIK .. 9200 65.20' 9300 74.67 9397 83.93 9397 83.93 9400 84.20 .... i' ' 9440 98.00 :100'~ 9440 '88.00 ~: ~ k · ': ~:~ p-~ - " " ..... ;~S~.-! 10300 88.00 · · ; - . · (~lll ((:)!13 ~SS'['~ m'.~2 1.0:11 ~ 1) DIRECTION VERT-DHPTHS SECT AZIMUTH BKB SUB-S DIST 6.53 4476 4398 227 6.53 4543 4465 229 6~53 4543 4465 229 3.51 4572 4494 230 353~52 4667 4589 229 352.20 4680 4602 229 352.20 7253 7175 122 352.20 8323 8245 77 13.22 8384 8306 78 39.92 8478 8400 94 56.29 9568 8490 126 66.32 8652 8574 175 73.06 9726 8648 238 77.30 8779 8701 300 78~04 8798 8710 314 82;01 s837 87~0 399 02.84 0847 0769 420 8s.43 8872 8794 493 88.48 sase 08~2 888 88.48 8890 asia ssa 88.54 8890 8812 591' 89.74 0893 8815 '630 89-;'74- 8893 8815 · e9:74: 892.i ' 8048 . .x490 :: ' '- 9081 -'9~3 ',.-~?:',': ~ .. . .: -L ':;{;~-' .. '" . . : ~1-::~.. .. : . ~. : -~ a:;~:..:.:%..,~.-.'.- : .- ..:... ? :;...:..~.. - :: 1: .- . . . %: ": .~ .: ~..'' . . . . . .. .'. - .. RELATIVE-COORDINATRS FROM-THI~-WELLHEAD 68.74 N 226.60 88.98 N 228.90 88.98 N 228.90 97.78 N 229.69 127.63 N 228.90 STAT~-PLANE X Y 632422.22 5960551.06 632424.18 $960571.23 632424.18 5960~71.23 632424.80 ~960580.15 632423.49 5960609.98 131.70 N 226.39 E 941.54 N 117.39 E 1279.42 N 71.22 E 1297.54 N 72.15 E 1327.04 N 87.81 E 632422.91 5960614.04 632297.69 5961421.74 632245.60 5961757.72 632246.20 5961776.86 632261.34 5961806.62 1355.17 N 120.37 1381.09 N 168.83 1403 . 99 N 231.71 1420.3'0 N 293.84 1423.20 N 307.11 632293.39 5961835.32 632341.38 5961862.08 632403.85 5961886.09 632465.68 5961903.48 632478.89 5961906.62 1438.'i2 N 392.74 E 1440.91 N 413.76 I~ 1448.29' N 48S.99 i~ z4s3..3s N 581.30 e 1453.35 N 581.30 E 632864.24 5961923.04 632585.:2Z'S96Z926.20 632657.29 59~i934.85 632752.49 S961941.58 632752.&9 S961941.58 L483.42 N 884.04 s 632785.22 s~;194~.70 1454.02 ~ ~23.e3 e-6327~5.-~ S962~3.00 . . . :.' -.. · . :' .~':'~ ~. . '~ *. .. . . .-:;. ' .:'~ ~y ~ ~%~ :<- . . - ..- . , . . , -. ~:..'>-; .: -. / . I~ ~ '"'" ': ~;~:' :':" ' ' ' - . . - - . . ~... ' ' i ' i ' i - - ' .- ,~ z:c~ ~nF-.-.'-%ff. - . .. EXECU - _.:_ i L FACE 100 RS 1.48 93L 1.48 93~ 1.48 90b 3.00 81L 3.00 3.00 0.00 98L 0.00 78R 10.00 53R 10.00 38R 10.00 29R 10.00 24R 10.00 22R 10.00 21R 10.00 19R 10.00 19R 10.00 18R 10.00 18R 10.00 18R 10.00 18R 10. O0 10. O0 10. O0 · O. O0 I) Z I C3 I) i-ri ITl m '. : 00'0 - 0O' 0'1: co'cz 00' 0T 1LIST 00'0T HOT 00'0T HgT 00'0~ H8T 00'0T 00'0T m i Il - # NV-Id CC)" I~t1: H H .6 C' RECEIVED -- · : : . · -.....-.q ... :': =;- -: . · '.. ..-.. dUt~ 2¢ 1.9~5 ·-' ' Ala~ka'¢ii: " - . .&.Ga'~ Cons. Commission' : : ',':"-:" ':' :~:r::r, orr-.?. . .'.-.:.,' '-.:.-.....: : · . . · ...:.-;7::.:;: : .....:; -.;. - .- .... -. · · ..;:':=.:. :. . :;... . .. .. L :. ' ~'.o06-' ~8'o6 . :: ~Eg ' STBe cGee -,/...'.SO 0£9.. 5188 C688 f~L'C6 ,..T66 gT88 0686 IRS'88 00'88 00'88- 0~6 ' 00'98 0~'~8 OOt6 £6'C6 L6~6 £6'[8 L6£6 Lg'~L 00~6 6['L9 · .. .. .o~'s9 ~ .OOT LU LLI CZ: (iD I z cji 00'0: oO'0T O0'OT O0'OT HCC o0'oz 00'0~ O0'OT ~SL 00'0 00'0 O0'C 00'£ OO'C ~06 8~'T ~£6 8~'I O0T /ua C9'906T96S 68'8LgE[9 H TT'L0£ 89'E06T96S 89'S99C£9 H 9B"~6C 60'988T966 S8'~0~CC9 ~ TL'~£C 80'~98196S 8C'T~CC9 8 C8'89T 98'9LLI96S 0~'99~C£9 H 6T'CL ~L"LSLI96S 09'S9~£9 3 ~C'TL ~L'I~9196~ 69'~6C~£9 H 86'609096S 6X'08S096S CC'~L~096S 8T'~C~C£9 · £C'ILS096S 90'TSS096S ii O,E' ii 66' EO&T ii LT'~G'£Z K OL'TET )T£ OTL8 88L8 ~O'SL 00£ TOL8 6LL8 O£'LL ' 8[C 8998 9CL8 90'£L SLT ~LS8 C599 C£'99 gzT 06~8 89S8 6C'9S ~6 0098 8L~8 C6'6C 8L 90E8 ~BC8 CC*~T C~T SLTL £~CL 0C'CSE 6~C C09~ 0899 OC~CSC TS'SS OOT6 LC'~S £806 65'9P 0006 99'LC 0068 OE'6~ 0088 6T"CC 00C8 88"LT 0098 Eg'LT 9CS8 £9"LT Cg'LT 9S'LT OOL9 C£'LT 0099 S£'LT T£ ' 9T 0 059 :H~DI~ OOT/O: HA~n3. '.. : . : · · NOI~D~Z~GI, C e~e8 S6/SC/90 (Scl) J~SSI-~1 WELL PERMIT CHECKLIST WELL NAME GEOL AREA UNIT# PROGRAM: exp [] dev [] redrll~ serv [] ON/O~ sao~ ciN,'k) ADMINISTRATION 1. Permit fee attached .................. N 2. Lease number appropriate ............... N 3. Unique well name and number .............. N 4. Well located in a defined pool ............. N 5. Well located proper distance from drlg unit boundary.. N 6. Well located proper distance from ~ther wells ..... N ' 7. Sufficient acreage available in drilling unit ..... N 8. If deviated, is wellbore plat included ........ N 9. Operator only affected party .............. N 10. Operator has appropriate bond in force ......... N 11. Permit can be issued without conservation order .... N 12. Permit can be issued without administrative approval.. N 13. Can permit be approved before 15-day wait ....... N ENGINEERING APPR DATE 14. Conductor string provided ............... ~~ ~:~ 15. Surface casing protects all known USDWs ........ ~1 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit .............. (vi N 21. If a re-drill, has a 10-403 for abndnmnt been approved. ~ N 22. Adequate wellbore separation proposed .......... ~ N 23. If diverter required, is it adequate ........... Y ~ 24. Drilling fluid program schematic'& equip list adequate ]~~ N 25. BOPEs adequate .................... N 26. BOPE press rating adequate; test to ~O~ _psig. Y N 27. Choke manifold complies w/API RP-53 (May 84) ...... ~ N 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of E2S gas probable ............ ~ N GEOLOGY 30. 31. 32. 33. 34. Permit can be issued w/o hydrogen sulfide measures .... Y ~ _ Data presented on potential overpressure zones ..... y N Seismic analysis 9f shallow gas zones ......... Seabed condition survey (if off-shore) ....... /. Y N Contact name/phone for weekly progress reports . ./ . · Y N [exploratory only] GEOLOGY: ENGINEERING: COMMI SS ION: TAB ~/~ Comments/Instructions: HOW/jo - A:%FORMS%cheklist ~v 03~94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BaY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 6828.00 R. FRENCH J. RALL U-15A 500292256501 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 27-NOV-96 MWD RUN 7 R. FRENCH J. RALL MWD RUN 8 WORTHINGTON J. RALL JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 9 WORTHINGTON J. RALL MWD RUN 14 WORTHINGTON W. HELMS MWD RUN 15 WORTHINGTON W. HELMS MWD RUN 16 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD WORTHINGTON W. HELMS 19 liN 13E 5173 1809 76.60 75.10 46.80 OPEN HOLE CASING 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: BIT SIZE (IN) SIZE (IN) DEPTH (FT) 7.625 9086.0 6.750 10138.0 MWD - GR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL U-15A IS REPRESENTED BY RUNS 6-9 AND 14-16. RUNS 6, 7, AND 16 ARE DIRECTIONAL WITH GAMMA RAY (SGRD). RUNS 8, 9, 14, AND 15 ARE DIRECTIONAL WITH GAMMA RAY (SGRC), AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). ALL GAMMA RAY DATA IS DOWNHOLE RECORDED. GAMMA RAY DATA FOR RUNS 6, 7, AND 16 ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECTOR, AND IS DENOTED AS NGP/SGRD. GAMMA R_AY DATA FOR RUNS 8, 9, 14, AND 15 ACQUIRED WITH DUAL GAMMA RAY, GEIGER MULLER TYPE DETECTORS, AND IS DENOTED AS DGR/SGRC. A MEASURED AFTER DRILLING (MAD) PASS WAS RECORDED FROM 9215' TO 9397', AND IS PRESENTED AS PART OF MWD RUN 8. WELL U-15A IS NOT DEPTH SHIFTED, PER PHONE CONVERSATION BETWEENALI TURKER (SPERRY-SUN) AND DONNA MESSER (BP) ON 18-OCT-96. WELL U-15A KICKS OFF FROM WELL U-15A PB2 AT 9582'. WELL U-15A WAS DRILLED TO TD AT 10138'. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 8895.0 10060.0 9215.0 9979.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 6 8921.0 9197 . 0 7 9197.0 9398.0 8 9398.0 9549.0 9 9549.0 9582.0 14 9582.0 9850.0 15 9850.0 10059.0 16 10059.0 10138.0 MERGED MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : U-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 5 6 7 GR MWD 68 1 AAPI RPX MWD 68 1 OHMM RPS MWD 68 1 OHMM RPM MWD 68 1 OHMM RPD MWD 68 1 OHMM PET MWD 68 1 HR ROP MWD 68 1 FPHR 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) Total Data Records: 78 998 BYTES * 28 Tape File Start Depth = 10080.000000 Tape File End Depth = 8885.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19129 datums Tape Subfile: 2 188 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8895.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIM UMANGLE: STOP DEPTH 9197.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 16-JUL- 95 MSC 1.32 DEP 2.041 MEMORY 9197.0 8921.0 9197.0 0 52.1 54.9 TOOL NUMBER NGP BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.750 9086.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 10.00 67.0 10.1 39000 6.4 .000 .000 .000 .000 .0 137.5 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 6. CN WN FN COON STAT BP EXPLORATION (ALASKA) U-15A PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9205.000000 Tape File End Depth = 8885.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1924 datums Tape Subfile: 3 71 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9198.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9347.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTR3~TE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 7. 18-JUL-95 MSC 1.32 DEP 2.041 MEMORY 9398.0 9197.0 9398.0 0 59.7 80.5 TOOL NUMBER NGP 6.750 9086.0 FLO- PRO 10.00 66.0 9.0 43000 5.2 .000 .000 .000 .000 .0 141.6 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT BP EXPLORATION (ALASKA) U-15A PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9355.000000 Tape File End Depth = 9190.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 20123 datums Tape Subfile: 4 67 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9208.0 EWR4 9215.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9457.0 9464.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 19-JUL- 95 MSC 1.32 DEP 2. 041 MEMORY 9549.0 9398.0 9549.0 0 84.4 88.0 TOOL NUMBER P0002SP4 P0002SP4 6.750 9086.0 FLO- PRO 10.00 77.0 9.7 42500 4.0 .120 .049 .090 .180 73.0 163.0 73.0 73.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : U-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 23 Tape File Start Depth = 9555.000000 Tape File End Depth = 9200.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7613 datums Tape Subfile: 5 88 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9421.0 EWR4 9428.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWATHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9582.0 9582.0 21-JI3L-95 MSC 1.32 DEP 2.041 MEMORY 9582.0 9549.0 9582.0 0 87.4 95.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0002SP4 P0002SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.750 9086.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 9.90 77.0 9.4 43000 2.8 .100 .045 .080 .150 72.0 169.0 72.0 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : U-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API,API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 12 Tape File Start Depth = 9590.000000 Tape File End Depth = 9415.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 22932 datums Tape Subfile: 6 77 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 14 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9512.0 9764.0 EWR4 9519.0 9771.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 27-JUL-95 MSC 1.32 DEP 2.041 MEMORY 9850.0 9582.0 9850.O 0 84.2 100.1 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0388SP4 P0388SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.750 9086.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 9.90 71.0 8.6 38000 3.0 .120 .053 .090 .220 72.3 174.0 72.3 72.3 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 14. $ : BP EXPLORATION (ALASKA) : U-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD~ 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 23 Tape File Start Depth = 9860.000000 Tape File End Depth = 9505.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13302 datums Tape Subfile: 7 88 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 15 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9761.0 EWR4 9768.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAX IMUM ANGLE: STOP DEPTH 9972.0 9979.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 29-JUL-95 MSC 1.32 DEP 2.041 MEMORY 10059.0 9850.0 10059.0 0 88.8 97.7 TOOL NUMBER P0388SP4 P0388SP4 6.750 9086.0 FLO-PRO 9.70 73.0 8.8 41000 3.2 .110 .000 .100 .210 75.0 150.1 69.0 69.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 15. $ : BP EXPLORATION (ALASKA) : U-15A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 21 Tape File Start Depth = 10065.000000 Tape File End Depth = 9755.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 27901 datums Tape Subfile: 8 86 records... Minimum record length: 38 bytes Maximum record length: 998 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 16 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9972.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10060.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ 30-JUL-95 MSC 1.32 DEP 2.041 MEMORY 10138.0 10059.0 10138.0 0 89.1 90.6 TOOL NUMBER NGP BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.750 9086.0 BOREHOLE CONDITIONS MI/D TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 9.80 75.0 8.4 39000 3.6 .000 .000 .000 .000 .0 150.1 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 16. CN WN FN COUN STAT BP EXPLORATION (ALASKA) U-15A PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 3 Tape File Start Depth = 10080.000000 Tape File End Depth = 9965.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13996 datums Tape Subfile: 9 66 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 10 is type: LIS 96/11/26 01 **** REEL TRAILER **** 96/11/27 01 Tape Subfile: 10 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 27 NOV 96 6:02p Elapsed execution time = 1.54 seconds. SYSTEM RETURN CODE = 0 Tape ~ubfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWn/M; nOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 6829.00 R. FRENCH J. RALL U-15A PB1 500292256570 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 27-NOV-96 MWD RUN 2 R. FRENCH J. RALL MWD RUN 3 R. FRENCH J. RALL MWD RUN 4 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: R. FRENCH J. RALL MWD RUN 5 R. FRENCH J. RALL MWD RUN 6 19 liN 13E 5173 1809 76.60 75.10 46.80 BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.750 10101.0 MWD - GR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL U-lSA PB1 IS REPRESENTED BY RUNS 1-5. RUNS 1-5 ARE DIRECTIONAL WITH GAMMA RAY (SGRC), AND ELECTROMAGNETIC WAVE 4-PRASE RESISTIVITY (EWR4). ALL GAMMA RAY DATA IS DOWNHOLE RECORDED. GAMMA RAY DATA ACQUIRED WITH DUAL GAMMA RAY, GEIGER MULLER TYPE DETECTORS, AND IS DENOTED AS DGR/SGRC. WELL U-15A PB1 IS NOT DEPTH SHIFTED, PER PHONE CONVERSATION BETWEEN ALI TURKER (SPERRY-SUN) AND DONNA MESSER (BP) ON 18-OCT-96. WELL U-15A PB1 KICKS OFF FROM WELL U-15 AT 9039'. WELL U-15A PB1 WAS DRILLED TO TD AT 10101'. FILE HEADER FILE NIIMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 8958.0 10014.0 8965.0 10021.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 9039.0 9375.0 2 9375.0 9550.0 3 9550.0 9750.0 4 9750.0 9815.0 5 9815.0 10101.0 MERGED MAIN PASS. CN WN FN COUN STAT BP EXPLORATION (ALASKA) U-15A PB1 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod GR MWD 68 1 AAPI RPX MWD 68 1 OHMM RPS MWD 68 1 OHMM RPM MWD 68 1 OHMM RPD MWD 68 1 OHMM FET MWD 68 1 HR ROP MWD 68 1 FPHR 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) Total Data Records: 75 998 BYTES * Tape File Start Depth = 10110.000000 Tape File End Depth = 8950.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 18569 datums Tape Subfile: 2 169 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8958.0 EWR4 8965.0 -$ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9295.0 9302.0 08-JUL- 95 MSC 1.32 DEP 2.041 MEMORY 9375.0 9039.0 9375.0 0 48.1 78.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0002SP4 P0002SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.750 9039.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 9.60 85.0 9.3 37000 4.4 .140 .064 .110 .210 72.0 165.0 72.0 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : U-15A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples.Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 29 Tape File Start Depth = 9385.000000 Tape File End Depth = 8950.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6969 datums Tape Subfile: 3 94 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9234.0 EWR4 9241.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9458.0 9465.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 10-JUL-95 MSC 1.32 DEP 2.041 MEMORY 9550.0 9375.0 955O.O 0 78.2 89.9 TOOL NUMBER P0002SP4 P0002SP4 6.750 9039.0 FLO - PRO 10.00 85.0 9.6 43500 4.4 .100 .045 .080 .150 70.0 165.0 70.0 70.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 2. $ : BP EXPLORATION (ALASKA) : U-15A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 22 Tape File Start Depth = 9560.000000 Tape File End Depth = 9225.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 23938 datums Tape Subfile: 4 87 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9454.0 EWR4 9460.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9662.0 9669.0 12-JUL-95 MSC 1.32 DEP 2.041 MEMORY 9750.0 9550.0 9750.0 0 82.1 95.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0002SP4 P0002SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.750 9039.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO - PRO 10.00 66.0 9.4 42500 4.0 .130 .058 .100 .200 69.0 163.0 69.0 69.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : U-15A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 21 Tape File Start Depth = 9760.000000 Tape File End Depth = 9445.000000 Tape File Level Spacing = 0.500000 Tape.File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 12018 datums Tape Subfile: 5 86 records... Minimum record length: Maximum record length: 62 bytes 998 bytes · Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9663.0 EWR4 9670.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXI~ ANGLE: STOP DEPTH 9727.0 9734.0 13-JUL-95 MSC 1.32 DEP 2.041 MEMORY 9815.0 9750.0 9815.0 0 78.7 78.7 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0002SP4 P0002SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.750 9039.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 10.00 66.0 9.4 42500 4.0 .120 .048 .090 .180 70.0 163.0 70.0 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT BP EXPLORATION (ALASKA) U- 15A PB1 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 11 Tape File Start Depth = 9820.000000 Tape File End Depth = 9655.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 26587 datums Tape Subfile: 6 76 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9728.0 EWR4 9735.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10014.0 10021.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 'NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 14 -JUL- 95 MSC 1.32 DEP 2.041 MEMORY 10101.0 9815.0 10101.0 0 66.6 75.6 TOOL NUMBER P0002SP4 P0002SP4 6.750 9039.0 FLO - PRO 10.00 67.0 9.4 42000 4.2 .100 .048 .080 .150 74.0 163.0 74.0 74.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 5. $ : BP EXPLORATION (ALASKA) : U-15A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD' 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 . * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 26 Tape File Start Depth = 10110.000000 Tape File End Depth = 9720.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 18267 datums Tape Subfile: 7 91 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 8 is type: LIS 96/11/26 01 **** REEL TRAILER **** 96/11/26 01 Tape Subfile: 8 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Tue 26 NOV 96 8:46p Elapsed execution time = 1.43 seconds. SYSTEM RETURN CODE = 0 Tape Subtile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT rC.-D / LOGS I C 0 F IL LOGGING COMPAN~8~ TAPE CREATION DATE JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 6 6830.00 R. FRENCH J. RALL U-15A PB2 500292256571 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 11-26-96 MWD RUN 7 R. FRENCH J. RALL MWD RUN 8 WORTHINGTON J. RALL MWD RUN 9 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WORTHINGTON J. RALL WELL CASING RECORD ~DRUN 10 WORTHINGTON W. HELMS 19 liN 13E MWD RUN 11 WORTHINGTON W. HELMS 5173 1809 76.60 75.10 46.80 OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: BIT SIZE (IN) SIZE (IN) DEPTH (FT) 7.625 9086.0 6.750 10026.0 MWD - GR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL U-15A PB2 IS REPRESENTED BY RUNS 6-11. RUNS 6 AND 7 ARE DIRECTIONAL WITH GAMMA RAY (SGRD). RUNS 8-11 ARE DIRECTIONAL WITH GAMMA RAY (SGRC), AND ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). ALL GAMMA RAY DATA IS DOWNHOLE RECORDED. GAMMA RAY DATA FOR RUNS 6 AND 7 ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECTOR, AND IS DENOTED AS NGP/SGRD. GAMMA RAY DATA FOR RUNS 8-11 ACQUIRED WITH DUAL GAMMA RAY, GEIGER MULLER TYPE DETECTORS, AND IS DENOTED AS DGR/$GRC. A MEASURED AFTER DRILLING (MAD) PASS WAS RECORDED FROM 9215' TO 9397', AND IS PRESENTED AS PART OF MWD RUN 8. WELL U-15A PB2 IS NOT DEPTH SHIFTED, PER PHONE CONVERSATION BETWEEN ALI TURKER (SPERRY-SUN) AND DONNA MESSER (BP) ON 18-OCT-96. WELL U-15A PB2 KICKS OFF FROM WELL U-15A AT 8921'. WELL U-15A PB2 WAS DRILLED TO TD AT 10026'. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 8895.0 9933.0 RP 9214.0 9940.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 6 8921.0 9197.0 7 9197.0 9398.0 8 9398.0 9549.0 9 9549.0 9798.0 10 9798.0 9972.0 11 9972.0 10026.0 MERGED MAIN PASS. CN WN FN COLIN STAT : BP EXPLORATION (ALASKA) : U-15A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod GR MWD 68 1 AAPI RPX MWD 68 1 OHMM RPS MWD 68 1 OFIMM RPM MWD 68 1 OFIMM RPD MWD 68 1 OHMM FET MWD 68 1 HR ROP MWD 68 1 FPHR 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 ~ ~ 28 * DATA RECORD (TYPE# 0) Total Data Records: 75 998 BYTES * Tape File Start Depth = 10040.000000 Tape File End Depth = 8885.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 18489 datums Tape Subfile: 2 178 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NI3MBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8895.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9197.0 16-JUL-95 MSC 1.32 DEP 2.041 MEMORY 9197.0 8921.0 9197.0 0 52.1 54.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 6.750 9086.0 BOREHOLE CONDITIONS MI/D TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MI/D PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 10.00 67.0 10.1 39000 6.4 .000 .000 .000 .000 .0 137.5 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS:~ MWD RUN 6. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : U-15A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9210.000000 Tape File End Depth = 8885.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1954 datums Tape Subfile: 3 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9198.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9347.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: MWD RUN 7. 18 -JUL- 95 MSC 1.32 DEP 2.041 MEMORY 9398.0 9197.0 9398.0 0 59.7 80.5 TOOL NUMBER NGP 6.750 9086.0 FLO- PRO 10.00 66.0 9.0 43000 5.2 .000 .000 .000 .000 .0 141.6 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT BP EXPLORATION (ALASKA) U-15A PB2 PRUDHOE BAY NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 9355.000000 Tape File End Depth = 9180.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19543 datums Tape Subfile: 4 68 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9208.0 EWR4 9215.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9457.0 9464.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 19-JUL- 95 MSC 1.32 DEP 2. 041 MEMORY 9549.0 9398.0 9549.0 0 84.4 88.0 TOOL NUMBER P0002SP4 P0002SP4 6.750 9086.0 FLO-PRO 10.00 77.0 9.7 42500 4.0 .120 .049 .090 .180 73.0 163.0 73.0 73.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 8. $ : BP EXPLORATION (ALASKA) : U-15A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD. 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 24 Tape File Start Depth = 9560.000000 Tape File End Depth = 9200.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7723 datums Tape Subfile: 5 89 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape' Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9421.0 EWR4 9428.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9711.0 9718.0 21-JUL-95 MSC 1.32 DEP 2.041 MEMORY 9798.0 9549.0 9798.0 0 87.4 95.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0002SP4 P0002SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.750 9086.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 9.90 77.0 9.4 43000 2.8 .100 .045 .080 .150 72.0 169.0 72.0 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): .0 0 REMARKS: CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : U-15A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 2 RPX MWD 68 1 3 RPS MWD 68 1 4 RPM MWD 68 1 5 RPD MWD 68 1 6 FET MWD 68 1 7 ROP MWD 68 1 ~PI 4 OHMM 4 OHMM 4 OHMM 4 OHMM 4 HR 4 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 26 Tape File Start Depth = 9805.000000 Tape File End Depth = 9415.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 25792 datums Tape Subfile: 6 91 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subtile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 10 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9706.0 EWR4 9713.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: # STOP DEPTH 9880.0 9887.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 22-JUL-95 MSC 1.32 DEP 2.041 MEMORY 9972.0 9798.0 9972.0 0 92.5 96.1 TOOL NUMBER P0002SP4 P0002SP4 6.750 9086.0 FLO-PRO 10.00 77.0 10.4 40000 3.2 .120 .048 .090 .180 66.0 173.7 66.0 66.0 .00 .000 .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 10. $ : BP EXPLORATION (ALASKA) : U-15A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1' 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 19 Tape File Start Depth = 9980.000000 Tape File End Depth = 9700.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 12212 datums Tape Subfile: 7 84 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9738.0 EWR4 9740.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9933.0 9940.0 23-JUL-95 MSC 1.32 DEP 2.041 MEMORY 10026.0 9972.0 10026.0 0 95.3 95.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 TOOL NUMBER P0388SP4 P0388SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.750 9086.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO- PRO 9.90 75.0 9.8 40000 3.2 .110 .051 .098 .195 66.0 177.0 66.0 66.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 11. $ : BP EXPLORATION (ALASKA) : U-15A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 ORMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 -90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 21 Tape File Start Depth = 10040.000000 Tape File End Depth = 9730.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 30761 datums Tape Subfile: 8 86 records... Minimum record length: 38 bytes Maximum record length: 998 bytes Tape Subfile 9 is type: LIS 96/11/24 01 **** REEL TRAILER **** 96/11/27 01 Tape Subfile: 9 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 27 NOV 96 6:06p Elapsed execution time = 2.47 seconds. SYSTEM RETURN CODE = 0