Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
195-202
STATE OF ALASKA ALASKA OI• D GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: ❑ Oil ❑ Gas ❑ SPLUG ❑ Other ® Abandoned ❑ Suspended 1b. Well Class: 20AAC 25.105 20AAC 25.110 ® Development ❑ Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other No. of Completions Zero ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 3/5/2011 195 - 202 310 - 323 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage, Alaska 99519 - 6612 01/05/1996 50 029 - 20717 - 02 - 00 4a. Location of Well (Govemmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 01/12/1996 PBU S -01B 1629' FNL, 4523' FEL, SEC. 35, T12N, R12E, UM 8. KB (ft above MSL): • 70.26' 15. Field / Pool(s): Top of Productive Horizon: 1078' FNL, 1585' FEL, SEC. 34, T12N, R12E, UM GL (ft above MSL): 37.10' Prudhoe Bay Field / Prudhoe Bay Total Depth: 9. Plug Back Depth (MD +TVD): Oil Pool 827' FNL, 1823' FEL, SEC. 34, T12N, R12E, UM 9785' 8866' 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD): 16. Property Designation: Surface: x - 618919 y 5979854 Zone ASP4 10149' 9140' ADL 028257 & 028258 TPI: x 616568 y - 5980368 Zone ASP4 11. SSSV Depth (MD+TVD): 17. Land Use Permit: Total Depth: x - 616326 Y 5980616 Zone ASP4 N/A 18. Directional Survey: ❑ Yes No 19. Water depth, if offshore: 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 MC 25.071): 22. Re- Drill/Lateral Top Window MD+TVD: MWD, GR, DIFL, ZDL, AC 5995' 5328' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" x 30" Insulated Conductor S rface 110' Surface 110' 36" 8 cu vds Concrete 13 -3/8" 72# L -80 Surface 2694' Surface 2693' 17-1/2" 3720 c ft Arctic Set 11 9-5/8" 47# L -80 Surface 5995' Surface 5328' 12 -1/4" 1558 cu ft Class 'G'. 130 cu ft Arctic Set 1 7" 29# L -80 5840' 10149' 5222' 9140' 8-1/2" 906 cu ft Class 'G' 24. Open to production or injection? ❑ Yes ® No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD / TVD) (MD +TVD of Top & Bottom; Perforation Size and Number): 4 -1/2', 12.6#, L -80 x 9492' MD TVD MD TVD 3 -1/2 ", 9.3#, L -80 9492' - 9574' 9517' / 8667' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. RP 201�� DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 9560 Plug w/ 30 Bbls Class Cement 9784' Drill Pilot Hole, Then Set Whipstock Top At * 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production N/A Date of Test: Hours Tested: Production For OIL -BBL: GAS-MCF: WATER -BBL: CHOKE SIZE: GAS -OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL -BBL: GAS-MCF: WATER -BBL: OIL GRAVITY-API (CORR): Press. 24 -Hour Rate 28. CORE DATA Conventional Core(s) Acquired? ❑ Yes - No Sidewall Core(s) Acquired? ❑ Yes No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summ �' •r'- "! .•f oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs an. ,• • a , - Iyti «: I -su is per 20 AAC 250.071. None RE3DMS APR 01 201WFjy, Asethfis Form 10-407 Revised 12/2009 CONTINUED ON REVERSE y1/ 0 /* ubmit Original Only 29. GEOLOGIC MARKERS (List all formations and markOncountered): 30. I11,1ATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test Permafrost Base results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Sag River 9624' 8746' None Shublik 9680' 8787' Sadlerochit 9801' 8878' Formation at Total Depth (Name): 31. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that the foregoi g is true and correct to the best of my knowledge. / / Signed: Terrie Hubble Title: Drilling Technologist Date: 3 / 3D l PBU S - B 195 - 202 310 - 323 Prepared By Name/Number. Terre Hubble, 564 -4628 Well Number Permit No. / Approval No. Drilling Engineer: Wilmer Hoffman, 564-4592 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection, Water Injection, Water - Altemating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029 - 20123 -00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • S -01B, Well History (Pre Rig Sidetrack) Date Summary 10/13/2010 WELL FLOWING ON ARRIVAL. RAN 2.70" x 20' DMY WHIPSTOCK, UNABLE TO PASS 9505' SLM / 9521' MD. RAN 3.70" CENT, 3.00" S.BLR & TAGGED XO @ 9476' SLM / 9492' MD, NO PROBLEMS. RAN 2.625" DRIFT & TAG BTM @ 9818' SLM, — 80' OF FILL FROM BTM OF LOWEST PERF. 10/14/2010 RAN PDS 40 ARM CALIPER FROM 9476' SLM / 9492' MD TO SURFACE. DRIFTED W/ 20' x 2.70" DMY WHPSTCK TO 9553' SLM. DRIFTED W/ 15' x 2.625" STEM TO 9553' SLM. DRIFTED W/ 10' x 2.625" STEM TO 9564' SLM. SET 3 -1/2" C -SUB @ 9494' SLM. PULLED BK -LGLV FROM ST #3 @ 7806' SLM / 7820' MD. PULLED BK -OGLV FROM ST #1 @ 9255' SLM / 9268' MD. 10/15/2010 PULLED RK -LGLV FROM ST #5 (5586' SLM / 5575' MD) & ST#6 (2984' SLM / 3002' MD). SET DUMMIES IN ST#6 (2984' SLM /3002' MD) #5 (5586' SLM /5575' MD) #3 (7813' SLM / 7820' MD). LRS LOADS IA W/440 BBLS OF CRUDE, SET BK -DGLV IN ST #1 (9255' SLM / 9268' MD). LRS PERFORMS PASSING MIT -IA 3000 #. PULLED 3 1/2" WHIDDON FROM 9494' SLM. WELL LEFT S /I, OPER NOTIFIED. 10/17/2010 T /I /0= 1600/650/300 MIT -OA PASSED to 2000 psi (CTD Prep) Pumped 3.4 bbls crude down OA to reach test pressure. OA lost 20 psi in the 1st 15 mins and 0 psi in the 2nd 15 mins for a total loss of 20 psi during the 30 min test. Bled OA to 50 psi. FWHPs= 1600/650/50 1/24/2011 WELL S/I ON ARRIVAL. BEGIN RIG UP. STAND -BY FOR SUPPORT EQUIPMENT (tri- plex). 1/25/2011 UNABLE GAIN O'RING SEAL ON PCE. PAD OPERATOR'S AMBIENT TEMP -43, R/D SLICKLINE UNIT. UNABLE TO COMPLETE RIG UP DUE TO COLD WEATHER. 1/26/2011 DRIFTED TBG W/ 2.25" CENT & S.BAILER, TAGGED SOFT TD @ 9908' SLM (9921' ELMD), —7' OF RATHOLE BELOW PERFS. RECOVERED SAND. RAN TEL & SBHPS GAUGES, TAGGED TT @ 9559' SLM ( +13 = 9572' ELMD), COMPLETED STOPS PER PROGRAM. GOOD DATA. WELL S/I ON DEPARTURE, PAD OP NOTIFIED. 2/6/2011 Job scope: Mill XN nipple and P&A. RIH w / LH motor & LH - 2.74 Diamond parabolic mill. Tag XN at 9560 (ctm), mill through XN, working down to WLEG at 9570. Dry drift down through XN and back up. POOH. At surface, mill shows worn buttons radially. Make up 2.50" cementing nozzle. �� 2/7/2011 Job scope: RIH to set 30 bbl cement plug. Tag fill at 9940' CTMD. Perform injectivity test at 1.4 bpm, C/ ""_ WHP= 900 psi, CTP= 3000 psi. La in 3 bbls of 16.5 • • • cement 1 :1 S• ueez- • 1 • • I' • • • - Squeeze to 1000 psi. RIH with bio and contaminate to 9560' TOC. Reciprocate coil jetting jewelry. POOH. Freeze Protect, RDMO. Job complete. 2/21/2011 T /I /O= TWC/1850/100, Temp =SI. Monitor TBG hanger test void during shel test. Stung into TBG hanger test void (1850 psi), unable to bleed void due to known bad primary seal on hanger. TRP pressure test tree to 5000 psi. No change in test void pressure. Pressure test on tree passed. 2/21/2011 T /I /O 0/1800/0 Pressure tested 4" 1/16 CIW Tree low 500 (PASS) high 5000 (PASS). 2/22/2011 T /I /O= TWC/1850/100. Temp= SI. WHPs, IA & OA FL (Eval IAxOA comm). No AL. Integral flange installed on IA. Well house and flowline have been removed. TWC installed in tree. Swab scaffolding removed. IA FL @ 100' (2 bbls). OA FL near surface. 2/22/2011 T /I /O 0/1800/0 Barrier test (PASS) Stabbed on lubricator and tested (PASS). Pulled 4" TWC and tested tree cap (PASS). 2/23/2011 T /I /O = SSV/1850/100. Temp = SI. Bleed IA & OA to 0 psi (CTD prep). Wellhouse, flowline and AL spool have been removed. Integral installed on IA. IA FL @ 100'. Bled IAP from 1850 psi to 740 psi in 1 4 flour31114niFeUgable to monitor due to weather. Job incomplete. Final WHPs = SSV/740 /100. Page 1 of 1 • 0 a t 4 IM �., ' a t e a. z N^ A SKA B P t z -�' '� i i ,�' y . � wr ' P- t" . :!:*A7::: k a 2 5 "�` , 1 �j�r�yp �' t _ a' SR inn ; r , k 21^` `� 5 42 p ; l fi Op o Su � � � xs ,, n e n b' 3 g . ;,4 d .,�C• x " , ;, .c a < . _ , , •r a.,�, _, " .', `vo gym .. .n '' . „ ✓ ° ,, 04 ` Common Well Name: S -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 3/1/2011 I End Date: 3/14/2011 X3- 00WFJ -C (3,144,111.00 ) 1 I Project: Prudhoe Bay Site: PB S Pad Rig Name /No.: NORDIC 2 Spud Date/Time: Rig Release: 3/21/2011 Rig Contractor: NORDIC CALISTA I UWI: Active Datum: S -01 @66.38ft (above Mean Sea Level) Date From - To Hrs Task Code NPT ! NPT Depth j Phase Description of Operations (hr) (ft) 2/28/2011 18:00 - 00:00 6.00 MOB j P PRE MOVE RIG OFF WELL, WO DHD TO BLEED DOWN ANNULI AND FULLBORE TO FREEZE PROTECT FLOWLINE , R &P'S TO MOVE A PILE OF A LOT OF SNOW TO THE MIDDLE OF THE PAD THAT WASN'T THERE AT CHANGE OUT AND THEN THEIR LOADER SPRUNG A LEAK AND HAD TO — LEAVE BEFORE THE PILE WAS MOVED _ 3/1/2011 00:00 - 02:00 2.00 MOB P PRE`. CONTINUE OPS FROM 2/28/2011 SEND RIG LOADER OVER TO MOVE PILE OF ;SNOW SO WE' CAN MOVE THE RIG 02:00 - 02:30 0.50 MOB P - PRE I PJSM TO MOVE RIG 02:30 - 03:40 1.17 MOB P PRE I MOVE RIG TO S -01C 03:40 - 04:00 0.33 MOB P " PRE i PJSMTO SPOT RIG OVER WELL 04:00 - 04:30 0.50 1 MOB P PRE 1, 1 SPOT RIG .' 04:30 - 12:00 7.50 MOB " P PRE LEVEL RIG AND`START RIG UP CONTINUE RU, SPOT SUPPORT EQUIPMENT 12:00 - 16:30 4.50 BOPSUR P PRE � _ T ST BOPE act) 16:30 - 17:30 1.00 BOPSUR P PRE BOP TEST COMPLETED, PRESSURE TEST SWAB, MASTER & SSV TO REMOVE THREADED COMPANION FLANGE AND `REPLACE WITH A BLIND FLANGE 17:30 - 21:00 3.50 1 BOPSUR P PIKE SWAP OUT THREADED FLANGE FOR BLIND I FLANGE ON TREE 21:00 - 21:30 LL 0.50 BOPSUR P PRE j FLANGES SWAPPED OUT, OPEN MASTER LAND SWAB TO PT TREE 21:30 - 22:00 0.50 • RIGU I P - - PRE ! PERFORM RIG EVACUATION DRILL AUDIABLE ALARM IS STILL NOT LOUD ENOUGH FOR ALL TO HEAR AT DIFFERENT LOCATIONS ON THE RIG. LOOK AT ADDING EVAC ALRM IN DOG HOUSE TO THE GAI TRONICS 22:00 - 00:00 2.00 RIGU P PRE PU INJECTOR AND MU STUFFING BOX PREP TO PULL CT ACROSS 3/2/2011 00:00 - 01:00 1.00 RIGU P PRE CONTINUE OPS FROM 3/1/2011 PULL TEST CT GRAPPLE AND REMOVE SHIPPING BAR AND CHAIN 01:00 - 01:55 0.92 RIGU j P PRE ' PULL CT ACROSS TO INJECTOR 01:55 - 03:00 ! 1.08 RIGU ' P PRE I START DISPLACING COIL WITH 10 BBLS ! j 1METH FOLLOWED BY 100 DEG FRESH L 1 WATER FOLLOWED BY KCL BIOZAN BRINE. 03:00 - 03:45 0.75 RIGU P PRE 1 PJSM TO PU INJECTOR AND PT THE INNNER REEL VALVE AND PACK -OFF 03:45 - 04:15 0.50 BOPSUR P PRE PT INNER REEL VALVE AND PACK -OFF 04:15 - 04:45 0.50 RIGU P PRE PUMP SLACK MANAGEMENT --11 -r 04:45 - 05:15 0.50 1 RIGU P PRE 1 RIG UP PIPE CUTTER AND CUT PIPE TO FIND — — WIRE Printed 3/30/2011 3 :50:29PM r $ /�r it' 'max z,� a -k n - .' r - z` a ,, 1 Z a Common Well Name: S -01 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 3/1/2011 End Date: 3/14/2011 X3- 00WFJ -C (3,144,111.00 ) Project: Prudhoe Bay Site: PBS Pad Rig Name /No.: NORDIC 2 Spud Date/Time: Rig Release: 3/21/2011 Rig Contractor: NORDIC CALISTA UWI: Active Datum: S -01 @66.38ft (above Mean Sea Level) Date From - To Firs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) 1 (ft) 05:15 - 08:30 3.25 RIGU P PRE FOUND WIRE AT ALMOST 1% SLACK, CUT AND SEAL WIRE AND TRY TO GET ANOTHER 100' OF SLACK PUMPED INTO REEL. PUMP AGAIN AND GET A TOTAL OF 259 FT OF SLACK INTO REEL. CUT BACK CT TO FIND CABLE, THEN TEST CABLE. 108:30 - 09:30 1.00 RIGU P `, PRE , - CHANGE OUT BLIND FLANGE ON WING 1 ,VALVE SIDE. 1 09:30 - 10:30 1.00 RIGU P j ' 4 PRE PJSM THENINSTALL CT CONNECTOR. PULL TEST TO 35K, GOOD. 10:30 - 12:30 2.00 RIGU P PRE ' BRING. TWC LUBRICATOR TO RIG FLOOR. M/U TWC PULLING TOOL. M/U LUBRICATOR TO ET RISER AND PT 250 / 3500. PSI AND CHART, GOOD. I ' PULL TWC. - 112:30 - 12:50 0.33 RIGU 7 P PRE OFFLOAD CUTCTAND TWC LUBRICATOR. i 12:50 - 1310 0.33 RIGU P. PRE CONDUCT RIG EVACUATION EXERCISE. INFORM DSO AND SIMOPS PERSONNEL 1 WORKING NEAR THE RIG. 1 - t _ EVERYONE MUSTERS IN OFFICE TRAILER AND IS ACCOUNTED FOR IN 3 MIN. , - I ' f CONDUCT AAR. 13:10 - 15:20 2.17 ` RIGU P ` ` PRE , OPEN WELL AND CONDUCT FLOW TEST WHILE BHI INSTALLS CABLE HEAD. i { INSTALL CABLE HEAD AND TEST, GOOD. PT CHECK VALVES IN UQC, GOOD. 15:20 - 15:40 0.33 STWHIP P [ WEXIT PJSM FOR M/U BHA. 1 W 15:40 - 18:00 2.33 STWHIP N WAIT ' 1 WEXIT ATTEMPT TO MN MILL TO MOTOR. CAN'T TORQUE MILL USING EITHER THE LITTLE JERKS OR THE CRUMMIES. BOTH THE LITTLE JERKS AND THE CRUMMIES I JAWS ARE TOO WIDE TO GRIP THE SHANK OF THE MILL. SEND MILL AND MOTOR TO BTT SHOP IN DEADHORSE TO GET IT TORQUED TO SPEC. 18:00 - 18:30 0.50 STWHIP N � WEXIT CREW CHANGE AND WAITING ON MOTOR & 1 _ MILL 1 18:30 - 18:45 0.25 STWHIP P WEXIT MOTOR AND MILL ON LOCATION, PJSM WITH NIGHT CREW TO MU MILLING BHA 18:45 - 19:45 ! 1.00 STWHIP P WEXIT MU BHA , NEW HCC 2.74" D -331 GAUGED 2.74 GO 2.73 NO -GO 19:45 22:00 2.25 STWHIP P WEXIT RIH 22:00 - 22:40 i 0.67 — STWHIP P WEXIT TIE IN AT 9450' 22:40 - 23:30 0.83 STWHIP P WEXIT CORRECT DEPTH -15' RIH AT MIN RATE AD TAG TOC 1 TAG TOC @ 9560.6', NICE i PU AND OPEN EDC TO SWAP HOLE OVER AT HIGHER RATE HIGH PRESSURE WITH THIS FLUID 2.4 © 4000 PSI 23:30 - STWHIP P WEXIT 1GOOD BIO BACK AT SURFACE, CLOSE EDC AND BLOW DOWN TT LINE 1.5BPM @3150 PSI 11.5 TO 1.8K WOB 25 TO 28 FPH @ 20° ROHS STALLS; 9562', 9564' MIDNIGHT DEPTH AT 9569' Printed 3/30/2011 3:50:29PM 71e1'411°0 Summary Replor�t Common Well Name: S -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 3/1/2011 End Date: 3/14/2011 X3- 00WFJ -C (3,144,111.00 ) Project: Prudhoe Bay Site: PB S Pad Rig Name /No.: NORDIC 2 Spud Date/Time: Rig Release: 3/21/2011 Rig Contractor: NORDIC CALISTA UWI: Active Datum: S -01 ©66.38ft (above Mean Sea Level) Date ; From - To Hrs Task Code NPT NPT Depth ! Phase I Description of Operations (hr) (ft) 3/3/2011 00:00 - 03:00 3.00 STWHIP P WEXIT CONTINUE MILLING PILOT HOLE 1.5BPM @3150 1 2 6 -30 FPH MILLING W /2.5K WOB MILLING AT 20° ROHS 03:00 - 05:00 2.00 STWHIP P WEXIT ' CONTINUE MILLING @ 30 FPH 11 6BPM @ 3523 PSI WOB= 1.6 TO 2.2K 05:00 - 07:40 2.67 STWHIP P WEXIT ' MILLING CMT @ 30 -40 FPH 'F:6 BPM @ 3300 PSI FS WOB = "0.8 T0 1.5K MILL TO 9738 FT. 07:40 08:30 0.83 STWHIP P WEXIT WIPER TRIP BACK TO 9400 FT WITH OPEN EDC. I PUMP 2.23 BPM @ 4000 PSI. HOLE IS CLEAN BOTH WAYS, NOTHING SEEN Ot4WIPER." 08:30 - 09:20 0.83 STWHIP P WEXIT ` MILL FOR A SHORT TIME AT 9738 FT THEN PICK UP ", WAIT CLARIFICATION OF MILLING PARAMETERS FROM ODE. 09:20 - 10:00 0.67 STWHIP P WEXIT MILL FROM 9738 FT. MAINTAIN 20R TF FOR THE LENGTH OF THE PILOT HOLE. 10:00 - 10:40 0.67 STWHIP P WEXIT MILL CEMENT @ 15 FT /HR. DWOB = 1.31K, MOTOR WORK = 187 PSI. MILL TO 9745 FT. 10:40 - 11:00 0.33 STWHIP P WEXIT MILL CEMENT @ 9 FT /HR. I I DWOB = 1.47K, MOTOR WORK = 235 PSI. MILL TO 9752 FT. 11:00 - 11:50 0.83 STWHIP P WEXIT MILL CEMENT @ 17 FT /HR. DWOB = 1.11K, MOTOR WORK = 169 PSI. L _ MILL TO 9763 FT. 11:50 - 12:20 0.50 STWHIP P WEXIT MILL CEMENT @ 14 FT /HR. DWOB = 0.81K, MOTOR WORK = 148 PSI. MILL TO 9772 FT. 12:20 - 12:50 0.50 STWHIP P WEXIT MILL CEMENT @ 20 FT /HR. DWOB = 1.35K, MOTOR WORK = 210 PSI. MILL TO 9784 FT. 12:50 - 13:30 0.67 STWHIP P i WEXIT MILL CEMENT @ 23 FT /HR. DWOB = 1.20K, MOTOR WORK = 287 PSI. MILL TO 9798 FT. 13:30 - 14:20 0.83 STWHIP P WEXIT MILL CEMENT @ 25 FT /HR. DWOB = 1.30K, MOTOR WORK = 276 PSI. MILL TO 9814 FT. 14:20 - 16:00 1.67 STWHIP P WEXIT ! MILL CEMENT @ 25 FT /HR. DWOB = 1.00 K, MOTOR WORK = 239 PSI. MILL TO 9835 FT. 6:00 - 17:00 1.00 STWHIP P WEXIT WIPER TRIP AND TIE -IN LOG. 1 BACKREAM TUBING TAIL AREA. FIRST PASS THROUGH HAS MOTOR WORK I NEAR TUBING TAIL, IN BOTH DIRECTIONS AT 120R TF. 1 17:00 - 18:00 1.00 STWHIP ! P WEXIT PULL BACK THROUGH TUBING TAIL AT 60 FT /HR AT 160L TF. ;18:00 - 18:30 I 0.50 STWHIP P WEXIT CREW CHANGE 18:30 - 19:00 ' 0.50 STWHIP P WEXIT CONTINUE REAMING TT AREA Printed 3/30/2011 3:50:29PM Opr ration Summary Report , i h s y r ,rii •. Common Well Name: S -01 1 AFE No Event Type: RE- ENTER- ONSHORE (RON) 1 Start Date: 3/1/2011 1 End Date: 3/14/2011 X3- 00WFJ -C (3,144,111.00 ) Project: Prudhoe Bay Site: PBS Pad Rig Name /No.: NORDIC 2 Spud Date/Time: Rig Release: 3/21/2011 Rig Contractor: NORDIC CALISTA UWI: Active Datum: S -01 ©66.38ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (ft) 19:00 - 19:30 0.50 STWHIP P WEXIT ;GETTING - 100PSI MOTOR WORK FROM 9580 1 TO 9584' DAY CREW WAS SEEING MOTOR WORK AT . 9573' WHILE REAMING HOLE PU AND REPEAT PASS DOWN, THIS COULD BE THE CASING CONTACT POINT AND THE MOTOR IS GETTING IN A LITTLE BIND - EFOLLOWING THE CASING DOWN 19:30 - 19:45 0.25 STWHIP P WEXIT STILL SEEING MOTOR WORK, DON'T KNOW I IF'ITS METAL OR CEMENT. 119:40 Ptk TO 9450' AND SET UP MWD TO LOG 1 CCL DOWN FROM X -O TO -100' PAST TUBING [TAIL 19:45 - 21:00 1.25 STWHIP P WEXIT LOG CCL FROM 9450' TO 9580' STILL SEEING MOTOR WORK TO 9584" 19 :50 CCL. COMPLETED, WE ARE OUTSIDE ITHE TT AND THIS IS THE DIRECTIONAL 1.1 !CHANGE FROM CASING CONTACT WITH THE 1, 1 MILL. ROLL TFTO 160° AS PER WELL PLAN I AND TRY TOKNOCKTHE HUMP DOWN. CALL 1 ODE AND DISCUSS OPTIONS TO ROLL TF 20° R &L OF 160° TO CLEAN HOLE FOR DRIFT AND WS ANCHOR. 21:00 - 22:00 1.00 STWHIP ` P WEXIT REAMED HOLE AT 0.5 FPM FROM 9585' TO 9570' AT 160 °, 180° AND 140 °. RIH AT MILLED TF @ 160° AND PILOT HOLE IS CLEAN. RIH TO BOTTOM AND CHASE OUT CUTTINGS WITH HI VIS BIO /KCL AND CHASE UP TO 9450' 22:00 - 23:00 1.00 STWHIP P WEXIT !OPEN EDC AND POOH AT MAX RATE CHASING CEMENT TO SURFACE 23:00 - 23:30 0.50 STWHIP P WEXIT 1 PJSM TO LD MILLING BHA 23:30 - 00:00 0.50 STWHIP P WEXIT 1 00H CHECK FOR FLOW, NO FLOW. PU L _ INJECTOR AND LD MILLING BHA 3/4/2011 00:00 - 01:00 1.00 STWHIP P WEXIT , LD BHA AND MILL CAME OUT 2.72 GO 2.71 NO GO. CALL ODE ABOUT UNDER GAUGED MILL 1AND SUGGEST WE CONTINUE WITH DRIFT AND CALIPER LOG. CALIPER LOG WILL LET US KNOW IF WE HAVE AND UNDER GAUGED 1 HOLE AND WE AN RUN ANOTHER 2.74" MILL. 01:00 - 01:45 0.75 STWHIP P WEXIT PLAN FORWARD IS TO CONTINUE MOVING FORWARD WITH WELL PLAN RU CREW ON LOCATION TO SWAP OUT TIGER TANKS 01:45 02:00 0.25 STWHIP P WEXIT I PJSM TO MU DRIFT BHA 02:00 - 02:30 0.50 STWHIP P WEXIT 1MU DRIFT BHA 02:30 - 04:25 � 1.92 STWHIP P WEXIT 1RIH WITH 2.625" DRIFT BHA 04:25 - 04:40 0.25 STWHIP P WEXIT ;TIE IN 04:40 - 04:50 0.17 STWHIP P WEXIT CORRECT DEPTH -16', RIH SLOW TO TOC (THEN SLOW DOWN TO 10 FPM UNTIL WE ;GET PAST CASING CONTACT POINT AT 9580'. PUMP AT 0.4 BPM 04:50 - 05:05 0.25 STWHIP P WEXIT I SAW A LITTLE DRAG - 3-400# AT 9585' TO 1 9587' AND AGAIN AT 9590' TO 9592' 1 GETTNG SOME WEIGHT BOBBLES, SHUT — I DOWN PUMP Printed 3/30/2011 3:50:29PM > Operation Summary Retppi Common Well Name: S -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) I Start Date: 3/1/2011 End Date: 3/14/2011 X3- 00WFJ -C (3,144,111.00 ) Project: Prudhoe Bay Site: PB S Pad Rig Name /No.: NORDIC 2 Spud Date/Time: Rig Release: 3/21/2011 Rig Contractor: NORDIC CALISTA UWI: Active Datum: S -01 @66.38ft (above Mean Sea Level) Date ' From - To Hrs Task j Code '; NPT NPT Depth j Phase I Description of Operations (hr) (ft) 1 05:05 - 08:00 2.92 STWHIP P 1 WEXIT 1 TAG BOTTOM AT 9835' PU 20' THEN KICK � I ; PUMP ON 1 9600' TO 9570' WAS CLEAN PULLING BACK (T HROUGH, CONTINUE POOH. 08:00 - 09:00 1.00 STWHIP P WEXIT 'TAG STRIPPER, UD DRIFT ASSEMBLY. 09:00 - 09:30 0.50 j STWHIP P WEXIT I W LOAD MEMORY CALIPER TOOLS TO RIG FLOOR. VERIFY TOOL MEASUREMENTS AND M/U BHA SHEET. PJSM FOR P/U LOGGING TOOLS. 09:30 - 11:00 1.50 STWHIP P WEXIT . M/U BHA #3 - MEMORY CALIPER TOOLS. TEST TOOL AT SURFACE, ARMS EXTEND 'THEN RETRACT. _ M/U CT RISER. 11:00 - 13:00 2.00 STWHIP P WEXIT RIH, CAREFULLY `WITH- BHA #3. 13:00 - 13:40 0.67 STWHIP P WEXIT 3 BBLS PIT GAIN OVER PIPE DISPLACEMENT ON SLB DRILLER TRIP SHEET. STOP CT AND PUMP, FLOW CHECKWELL. NO FLOW. - FIND THAT SLB DEPTH COUNTER AT INJECTOR IS READING WRONG, ABOUT 800 �'. FT LESS THAN BHI DEPTH. - [HOWEVER THE BHI ENCODER AND THE SLB I ENCODER AT THE REEL ARE READING CORRECTLY. 3 BBL PIT GAIN CAME FROM THE 800 FT 1 DEPTH DISCREPANCY. CONTINUE RIH. _ 13:40 - 14:35 0.92 STWHIP ` P WEXIT !TIE-IN DEPTH FROM 9450 FT, CORRECT -15.5 FT. STOP AT 9825 FT AND FIX DPS, SLB ENCODER. COUPLER FOR DPS ENCODER HAS COME OFF. 1 14:35 - 15:05 0.50 STWHIP P WEXIT START LOGGING UPWARDS AT 40 FT/MIN. SLB ENCODER NOW WORKING CORRECTLY, MATCHING BHI EXACTLY. PARK AT 9399 FT AND WAIT FOR ARMS TO RETRACT. 15:05 - 16:40 1.58 STWHIP P WEXIT POOH. 16:40 18:00 1.33 STWHIP P WEXIT TAG STRIPPER AND UD LOGGING TOOLS. ALL CALIPER ARMS ARE IN PLACE. I DOWNLOAD DATA AND SEND TO HOUSTON FOR PROCESSING. 18:00 - 23:15 5.25 STWHIP P WEXIT CONTINUE WAITING FOR LOGS TO BE PROCESSED 23:15 - 00:00 0.75 STWHIP P WEXIT PDS DATA SHOWS WE HAVE A CLOSE TO HIGHSIDE HOLE AND 2.75" OR LARGER HOLE BIG ENOUGH TO SET THE WS ANCHOR. CALL OUT BTT WS 3/5/2011 00:00 P - - -_ ' i - - - -- - - - -- -- _ 01 00 1.00 STWHIP WEXIT I CONTINUE WO CALIPER LOG TO BE [PROCESSED 01:00 - 01:20 ; - -_ - -- � - - -- -- - -- - -- 0.33 STWHIP P WEXIT I BTT HAND ON LOCATION WITH WS, LOAD ' TOOLS ON RIG 01:20 - 01:30 0.17 STWHIP P WEXIT MU SETTING TOOL TO WS 01:30 - 01:40 0.17 STWHIP P WEXIT 1 PJSM TO MU WS BHA 01:40 - 02:00 0.33 STWHIP P ! WEXIT MU WS BHA, USE DIAL INCLINOMETER TO ZERO HS OF WS AND SCRIBE MU MWD AND MEASURE OFFSET Printed 3/30/2011 3:50:29PM Qf ��t ALAS B KA s � • Operation Summary Repo �v Common Well Name: S -01 AFE No Event Type: RE- ENTER- ONSHORE (RON) Start Date: 3/1/2011 End Date: 3/14/2011 X3 OOWFJ -C (3,144,111.00 ) Project: Prudhoe Bay Site: PB S Pad Rig Name /No.: NORDIC 2 Spud Date/Time: i Rig Release: 3/21/2011 Rig Contractor: NORDIC CALISTA 1 UWI: Active Datum: S -01 @66.38ft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) I (ft) 02:00 - 02:20 0.33 STWHIP P WEXIT PU INJECTOR AND MU BHI UQC TO LQC 02:20 - 04:35 2.25 STWHIP P WEXIT I RIH WITH EDC OPEN PUMPING AT MIN RATE 04:35 - 04:50 0.25 STWHIP P WEXIT. TIE IN TO UPPER MAKER ABOVE TOC 04:50 - 05:15 0.42 STWHIP P WEXIT 'RIH TO 9650' AND TIE INTO SAG RIVER MARKER AND CORRECT -2' AND RIH 05:15 - 05:30 0.25 STWHIP P WEXIT -- WT CK AT 9775' 44K UP RIHWT 14K RIH TO 9792.75' AND SET WS, TOWS IS 8.75' UPAT9784' SETTING TOOL SHEARED AT 4000 PSI, STACK 9.6K DOWN AND NO MOVEMENT 05:30 - 07:00 1.50 STWHIP P WEXIT POOH PVT 411 BBLS 07:00 - 07:20 0.33 STWHIP P WEXIT AT SURFACE, PJSM. 07:20 - 08:30 1.17 STWHIP P WEXIT ` STAND BACK COILTAK -TOOL AND UD 1 WHIPSTOCK RUNNING TOOLS. TOOLS HAVE FUNCTIONED NORMALLY. M/U BHA. #5 -. WINDOW MILLING BHA WITH 2. 74MILL AND STRING REAMER, 0.6 DEG MOTOR + 2.38 COILTRAK. _.. BHA OAL = 59.01 FT. 08:30 - 10:30 2.00 STWHIP I , P f WEXIT RIH BHA #5. LOG GR TIE -IN FROM 9650 FT, CORRECT -15.5 FT. �. 1 10:30 - 22:10 11.67 STWHIP . P. WEXIT 1 TAG BOTTOM AT 9785 FT AND BEGIN TIM SkOirk I (,MILLING. MAINTAIN OL TF. S 'ONC I IFS IS 2800 PSI @ 1.6 BPM. 10:00 - 9785.70 FT 2827 PS .24K DWOB. 11:00 - 9786.50 FT 294 11.88K 13:00 - 9787.06 FT • 7 PSI 2.08K 14:00 - 9787.30 - 2926 PSI 1.91K 15:00 - 978, FT 2893 PSI 1.83K 16:00 - • :7.80 FT 2897 PSI 1.85K 17 - 9788.20 FT 2867 PSI 2.04K • :00 - 9788.80 FT 2842 PSI 1.97K 1 19:40 - 9789.00 FT 2938 PSI 2.11K 21:40 - 9790.10 FT 2834 PSI 1.60K EXIT 7" CASING 100 PSI PRESSURE AND 500# WOB I LOSS CONTINUE TIME MILLING FOR 1.4' TO GET STRING MILL PAST BOTTOM OF WINDOW THEN STARTPUSH TO GET AWAY FROM CASING 22:10 - 23:00 l 0.83 STWHIP P WEXIT I PUMP 35 BBLS 2# BIO PILL THEN CHASE WITH DRILLING MUD 23:00 - 00:00 1.00 HIP P WEXIT START MILLING RAT HOLE 9791.4' 00:00 9796' 3470 PSI 1.96K WOB CONTINUE MILLING RAT HOLE WHILE SWAPPING WELL TO MUD 3/6/2011 00:00 - 01: % 1.17 STWHIP P WEXIT CONTINUE MILLING RAT HOLE NEW MUD BOTTOMS UP SAMPLE FROM 9795' HAS GOOD FORMATION IN IT AND QUITE A BIT OF METAL 01:10 02:05 0.92 STWHIP P WEXIT PU AND BACK REAM 02:05 - 02:15 0.17 STWHIP P WEXIT ' MADE 5 CLEAN PASSES WITH PUMP ON, _L_ _ SHUT DOWN PUMP FOR DRY DRIFT Printed 3/30/2011 3:50:29PM NELLHEAD= MCEVOY (B. ELEV i 66.38' 1110 S _0 1 C SAFETY ES: 3F. ELEV = 37.81' (OP= 3004 DRLG DRAFT 0 i I 2181' I ---f 4- 112" HES HXO SSSV NIP, ID = 3.813" 1 Aax Angle = 47° @5904' Tatum MD = 9790' No 2596' H 9 -5/8" DV PKR I ?atum TVD = 8800' SS 113 -3/8" CSG, 72#, L -80, ID = 12.347" H 2694' I GAS LIFT MANDRELS I ST MD TVD DEN/ TYPE VLV LATCH PORT DAT 6 3002 2999 10 MMG DMY RK 0 10/15, Minimum ID = 1.78" @ 9268' 5 5575 5042 47 MMG DMY RK 0 10/15, 4 7139 6381 2 KBG2 -LS DMY BK 0 01 /17, 3.0" Deployment Sleeve Bushing 3 7820 7062 0 KBG2 -LS DMY BK 0 10/15, 2 8542 7784 1 KBG2 -LS DMY BK 0 01/17, 1 9268 8475 36 KBG2 -LS DMY BK 0 10/15, ,TOP OF 7" LNR H 5840' r e 5848' H BAKERZXPPKR 1 in wi MILLOUT WINDOW (S -01 B) 5995' - 6045' !TOP OF CEMENT J 5986' A 19 -5/8" CSG, 47 #, L -80, J = 8.681" H 5995' *4 A ,,,. 9247' H 2 -7/8" Otis "X" NIP, ID = 2.3131 4. 9232' H4-1/2" BKR KB LTP, ID = 2.37" (03/20/11) •10 9492' H4 -112" X 3-1/2" XO I 9263' H3.70" DEPLOY SLEEVE, ID = 3.00" I **1 **11 *1 *. 1 9503' J — J3 - /2" HES X NIP, = 2.750" I 9269' H3" DEPLOY SLV BUSHING, ID = 1.780" J t * * * * * * * * ; Y; 9517' , X 3 -1 /2" BKR.SA B -L PKR W /ANCHOR ���V 9542' I -J3 - 1/2" HES X NIP, ID = 2.750" I �1�1�1�1 * % % 9562' 1 3 -1/2" HES XN NIP, MILLED TO 2.75' 2.74" MILLOUT WINDOW (S -01 B) 9786' - 9791' ....WC 1 (02/06/11) 0 ********4 1 114 k �'v`y`v'y♦y4V 9574' 1-13-1/2" W /LEG I 0 � y �i , ( 9572' H ELMD TT LOGGED 06 /23/96 1 •144044444 , I TOC P &A J---J 956 0 • "" 4 00404* . ,�' �� • 9865' -J TOC liner I I3 -1/2" TTw hip in pilot hole (03/04/1 i� 9785' MCI 41 1 12089' I PBTD ITOP OF CEMENT H 9737' 2 -3/8" LNR, 4.6#, L -80, .0039 bpf, 10 = 1.992" 12129' REF LOG: DIFL ON 01/12/96 0 •••f # t••$ • f # t # 1 ` 44 4 40044 4 ANGLE AT TOP PERF:7?@ 10290' ...OM.** Note: Refer to Production DB for historical pert data # �1�1�1���1��•••�1 1 SIZE SPF INTERVAL Opn/Sgz DATE * 2" 8 9630 - 9670 S 02/06/11 60.0040 3 -3/8" 6 9802 - 9832 S 02/06/11 01���1�1 1114 444 • PBTD J --I 10040' I 2" 6 9832 - 9857 S 02/06/11 04440 4 * 414440100 X10∎ 2" 6 9866 - 9886 S 02/06/11 04440044444 10 • ••1 ,1�1�1�1�������1�444 444�� 4*A- 2" 6 9894 - 9914 S 02/06/11 �'�'*'4'•'•'•♦•♦•'�♦�1 '4 ■ 4 '0 4• • 1.56 6 10290 - 10710 0 03/18/11 .� *� *� *� *� *� *� *� *� * * 1.56 6 11450 - 12030 0 03/18/11 *� *�1� *� *�1� *� *�1� *� * 1.56 6 12060 - 12083 0 03/18/11 7.4"V.'� 17" LNR, 29#, L -80, BTC -MOD, 0.0371 bpf, ID = 6.184" H 10149' 9 -5/8" CSG, 47 #, 1-80, ID = 8.681" H 10098' 4.+1.1...+1...4.11.44.1 DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 1982 ORIGINAL COMPLETION WELL: S - 01C 01117/96 N28E SIDETRACK (S -01B) PERMIT No: 2101440 03/21/11 NORDIC 1 CTI) SIDETRACK (S -01C) API No: 50 - 20717 - 03/29/11 PJC DRLG HO CORRECTIONS SEC 35, T12N, R12E, 1629' FNL & 757' FWL ~ ~ ~ BP Exploration (Alaska) Inc. ~ x ~ Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 June 25, 2009 ~~ Enclosed please find a spreadsheet with a list of wells from S-Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, ~.~~y~~d~~~' .~i~~ u ?_~C~ Torin Roschinger BPXA, Well Integrity Coordinator ~ BP Exploration (Alaska ) inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operetions (10-404) Sped ~ onee 6/25/2009 Well Name PTD N Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Conosion inhibitor Corcosion inhibitod sealant date ft bbls ft na al 16 1952020 025 NA 025 NA 2.8 5/30/2009 S-02A 1941090 025 NA 0.25 NA 1.7 5/25/2009 5-0.3 1811900 1325 NA 13.25 NA 92.65 5/20/2009 S-Oa 1830790 0 NA 0 NA 0.9 5/25/2009 S-OSA 1951890 0 NA 0 NA 0.9 5/26/2009 S-06 1621650 0 NA 0 NA 0.9 5/26/2009 S-07A 1920980 0 NA 0 NA 0.9 5/26I2009 5-088 2010520 0 NA 0 NA 0.85 5/27/2009 5-09 1821040 1.5 NA 1.5 NA 9.4 5/37I2009 S-~OA 1911230 0.5 NA 0.5 NA 3.4 5/31/2009 S-11B 1990530 025 NA 025 NA 1.7 5/27/2009 S-12A 1851930 025 NA 025 NA 7.7 6/7/2009 5-13 1821350 8 NA 8 NA 55.3 6/1I2009 5-15 1840170 025 NA 0.25 NA 3 6/2/2009 S-17C 2020070 025 NA 0.25 NA 2.6 6/t/2009 S-18A 2021630 0.5 NA 0.5 NA 3 6/2/2009 S-19 1861160 0.75 NA 0.75 NA 22 5/19I2009 S-20A 2070450 025 NA ~ 025 NA 1.3 5/19/2009 5-21 1900470 0.5 NA 0.5 NA 3.4 5/25/2009 S-228 1970510 0.75 NA 0.75 NA 3 5/19/2009 5-23 1901270 025 NA 025 NA 1.7 5/25/2009 S-246 2031630 0.5 NA 0.5 NA 2.s 5/25/2009 S-25A 1982140 0.5 NA 0.5 NA 2.6 5/25/2009 S-26 1900580 0.75 NA 0.75 NA 3.4 5/26/2009 5-278 2031680 0.5 NA 0.5 NA 2.6 5/31/2009 S-288 2030020 0.5 NA 0.5 NA 2.s 5/31/2009 S-29AL1 1960120 0 NA 0 NA 0.85 5/27/2009 S30 1900660 0.5 NA 0.5 NA 5.7 5/31/2009 S-31A 1982200 0.5 NA 0.5 NA 3.4 S/26l2009 S32 1901490 0.5 NA 0.5 NA 3.4 5/31/2009 S33 1921020 0.5 NA 0.5 NA 4.3 5/26/2009 S34 1921360 0.5 NA 0.5 NA 3.a 5/31l2009 5-35 1921480 0 NA 0 NA .esin 5/31/2009 S36 1921160 0.75 NA 0.75 NA 425 5/27/2009 S37 1920990 125 NA 125 NA 7t.s 5/27l2009 S-38 1921270 0.25 NA 025 NA t02 5/27/2009 5-41 1960240 1.5 NA 1.5 NA 11.7 5/30/2009 S-42 1960540 0 NA 0 NA 0.9 5/30/2009 5-43 1970530 0.5 NA 0.5 NA 1.7 5/28/2009 S-a4 1970070 025 NA 0.25 NA 1.7 5/28/2009 S-100 2000780 2 NA 2 NA 213 5/29/2009 S-101 2001150 125 NA 725 NA 11.9 5/29/2009 5-102L7 2031560 125 NA 125 NA 11.1 5/31/2009 5-103 2001680 7.5 NA 1.5 NA 77.9 5/18I2009 5404 2001960 1.75 NA 175 NA 15.3 5/20/2009 S-105 2001520 4 NA 4 NA 32.7 5/20l2009 S-106 2010720 1625 NA 1625 NA 174.3 6/2/2009 S-107 2011130 2.25 NA 225 NA 28.9 5/18/2009 S-7oe 2011000 3.5 NA 3.5 NA 40 5/30/2009 S-109 2022450 2 NA 2 NA 21.3 5/30/2009 5-110 2071290 11.75 NA 17.75 NA 98.6 5/30/2009 S-117 2050510 2 NA 2 NA 19.6 5/30/2009 5-112 2021350 0 NA 0 NA 0.5 5/30/2009 5-113 2021430 1.75 NA 1.75 NA 22.1 5/18/2009 5-174A 2021980 125 NA 125 NA 702 5/30/2009 S-715 2022300 2.5 NA 2.5 NA 27.2 5/29/2009 S-116 2031870 1.5 NA 1.5 NA 13.6 5/28/2009 S-117 2030120 1.5 NA 1.5 NA 75.3 5/29/2009 S-178 2032000 5 NA 5 NA 76.5 5/28/2009 S-119 2041620 1 NA 1 NA 52 5/30/2009 5-720 2031980 5.5 NA 5.5 NA 672 5/29/2009 5-~27 2060410 4.5 NA 4.5 NA 53.6 5l28/2009 S-122 2050810 3 NA 3 NA 21.3 5/29/2009 S-t23 2041370 1.5 NA 1.5 NA 20.4 5/26/2009 S-124 2061360 1.75 NA 1.75 NA 11.9 5/26/2009 S-t25 2070830 225 NA 225 NA 20.4 5/28/2009 S-126 20710970 125 NA 125 NA 75.3 6!1/2009 5-200 1972390 125 NA 125 NA /4.5 - 5/28/2009 5-201 2001840 0 NA 0 NA 0.85 6/19/2009 5-213A 2042130 2 NA 2 NA 13.6 5/29/2009 5-215 2021540 2 NA 2 NA 18.7 6/1/2009 S-27s 2001970 4.75 NA 4.75 NA 51 5/29/2009 5-277 2070950 0.25 NA 025 NA 7.7 6/1/2009 5-400 2070740 2 NA 2 NA 9.4 5/28/2009 S-a01 2060780 16 NA 16 NA 99.5 6/2/2009 S-564 0 NA 0 NA 0.85 5/26/2009 n ~ 1. Operations Abandon 0 Repair Well [2] Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Operat. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: . STATE OF ALASKA . ALASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS o o o SEP I 3 2006 Alaska Oil & Gas Cons. Commission 3. Address: Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development W Stratigraphic Stimulate 0 Other 0 WaiverO Time Extension 0 Re-enter Suspended Well 0 5. Permit to Drill Number: 195-2020 P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): Exploratory Service 6. API Number: 50-029-20717-02-00 9. Well Name and Number: 70.26 KB PBU S-01 B ADLO-028258 11. Present Well Condition Summary: 10. Field/Pool(s): PRUDHOE BAY Field! PRUDHOE OIL Pool 8. Property Designation: Total Depth measured true vertical 10149' 9140' feet feet Plugs (measured) Junk (measured) None None Effective Depth measured 10040' feet true vertical 9058' feet Casing Length Size MD TVD Burst CONDUCTOR 80' 20" 94# H-40 30'-110' 30'-110' 1530 SURFACE 2666' 13-3/8" 72# L-80 28'-2694' 28'-2693' 4930 Production 5966' 9-5/8" 47# L-80 29'-5995' 29'-5328' 6870 Liner 4309' 7" 29# L-80 5840'-10149' 5222'-9140' 8160 Collapse 520 2670 4760 7020 ·SÇANNEfÞ SEP 1 iJ 2005 Perforation depth: Measured depth: 9630' - 9832' True Vertical depth: 8750' - 8902' Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 35' - 9492' Packers and SSSV (type and measured depth) 7" X 3-1/2" BKR SABL 9517' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl 171 170 Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure 1~ 500 0 138 489 0 15. Well Class after proposed work: Exploratory Development 16. Well Status after proposed work: Oil Gas WAG Tubing pressure 242 265 13. Service Contact GARY PREBLE WINJ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title DATA ENGINEER Phone 564-4944 Date 9/8/2006 SEP 1 4 2006 Submit Original Only . . ~ ¥ .. S-OlB DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY FROM 04-25-06 SET 3.5" PXN PLUG BODY @ 9547' SLM. SET PRONG @ 9542' SLM (96" OAL 1.75" FN). SET 3.5" WHIDDON @ 9485' SLM. ***CONTlNUE ON 04-27-2006 WSR*** 4/27/2006 ***CONTINUED FROM 04-26-2006 WSR*** PULLED ST A# 1 DGL V HOLE 9503 MD******** ***WELL LEFT S/ **********WHIDDON C.S. LEFT IN ~_'__q ?",'_____, -________r·______vr__'·" T/I/0=920/340/9. Sf. Bradenhead Weld Prep (eta 5/1/06). Prepped tree and gravel. TBG FL @ 864' (13 bbls), IA FL @ surface & OA FL @ 36'. Bled OAP from 9 psi to 0 psi in 1 minute. Bled AL line from 2000 psi to 0 psi in 5 minutes. Monitored 30 minutes. OAP increased to 4 psi. Bled back to 0 psi. AL line increased to 85 psi. Final WHP's=920/340/0 (CMIT-TxIA) Pressure up Tbg and IA to 2500 psi with 19 bbfs crude for CMIT-TxlA. Initial Press.= T/I/0=2700/2500/0 15 min test 30 min. T est= T /1/0=2660/2365/0 ( Test Failed) Retest= IWHP=2780/2500/0. 15 min Test =T/I/0=2720/2450/0. 30 min Test =T/I/O= (CMIT-TxIA Passed) Circ out well for Braiden Head Weld Repair. - Pumped down up the IA to cosasco and into flowline. Pumped 5 bbls methanol spear, 753 bbls 1 % KCL, Bleed WHP's, Rigged up to Jumper line & freeze protected flowline & FWHP's=O/O/O 4/30/2006 Awgers continued from 04-29=06 RDMO FWHP=920/520/0 . (Note ! Ladder going up to tree needs repair. Leg Keeps Falling Off. ) O. Bradenhead Weld & IA BH weld). U-tubed TBG & IA with N2. TBG FL @ 86. IA FL @ 74'. Purged OA with N2. Welders made 3 Passes each on upper and lower Bradenhead. Final FLUIDS PUMPED BBLS 25 METHANOL 753 1 % KCL 18 DIESEL 796 TOTAL S-OlB (PTD #1952020) Classified as Problem Well e e 12G7f1 õll6/~ Subject: S-018 (PTD HI(52020) Classified as Problem Well From: "NSU, ADW Well Integrity Engineer" <NSUADWWellJntegrityEngineer(q},BP.com> D~\tc: Sun, 05 Mar 2006 20:41 :06 -0900 To: "Rossberg, R Steven" <Stevcn.Rossbcrg@BP.com>, "NSLJ, ADW Well Operations Supervisor" <NSUADWWellOperatiol1sSlIpcrvisor@BP.com>, "GPB, Wells Opt Eng" <G PB W cllsOptEng@BP.com>, jirn _rcgg@admin.state.ak.us, \\-'intoI1_ aubert@admin.statc.ak.us, "NSU, ADW WL & Completion Supervisor" <NSUADWWL&CompletionSupcrvisor@BP.com>, "Kurz, John" <.john.kllrz@BP.com>, "OPB, GC2 Area Mgr" <GPBGC2TL@BP.com>, "GPB, Optimization Engr" <GPBOptimizationEngr(@BP.com>, "Cooper, Katrina N" <Katrina.Coopcr@BP.com>, "GPB, GC2 Wcllpad Lead" <GPBGC2WcllpadLead@BP.com>, "OPB, GC2 OTL" <gpbgc2otl@BP.com>, "GPB, Well Pads SW (GPBWellPadsWZLV@BP.com)" <IMCEAEX-_ O=BP _ OU=USAPBU_ cn=Recipicnts _ cn=PBUW ellPadsSWZ@BP.com>, 'IY oung, Jim" <Jim.Yollng@ßP.com>, "Okwclegbe, Mark" <mark.ok\velegbe@BP.com>, "Robertson, Daniel B (Alaska)" <.[)anicl.B.RobcI1son@BP.com> CC: "Hughes, Andrea (VECO)" <hugha4@BP.com>, "NSLJ, ADW Wclllntegrity Engineer" <NSUADWWelllntcgrityEnginccr@BP.com>, "MCCOLLUM, CODY () (VECO)" <Cody.McCollllm@BP.com> All, Well 8-01B (PTD #1952020) has sustained casing pressure on the OA and has been classified as a Problem well. Wellhead pressures on 3/05/06 were 1860/1870/1720. The OA was observed to repressure from 40 to 1720 psi overnight. Also, bubbling was noted around the bradenhead/surface casing connection. ttz¿¡P;: ~VP .~ )J:k{f 6£ ?Cr>; Z 7. 2}~ j ()It- ':i6'bDrs' '3Z,o'ì;, . L.., 4-~o M.M,{ F f& Of) 4~v Plan forward is as follows: 1. DHD: TIFL 2. FB: Freeze protect well 3.8L:TTP 4. CAM: Evaluate wellhead seals 5. DHD: Repair bradenhead JÆ ¿JÄ- scp 1«ò70r';· Attached is a wellbore schematic. Please call if you have any questions. «8-01 B.pdt» Joe Anders, P.E. Well Integrity Coordinator, BP Exploration, (Alaska) Inc. Work: 1-907-659-5102 Mobile: 943-1154 Pager: 659-5100,x1154 Email: NSUADWWelllntegrityEngineer@bp.com (ì ¡, ¡ If. Content-Description: S-OlB.pdf Content-Type: application/octet-stream Content-Encoding: base64 1 of 1 3/8/20061:12 PM e TREE = VllEL LHEAD = ACTUA.1DR = KB. B.EV = BF. B.EV = KOP= tv1ax An Ie = DatumMD= DatumTVD = 4"CIW I\Ik;B/OY BAKER 66.38' 37.81' 3004' 5904' 9790' 8800' SS 5-01 B I SAFEI'Y NOTES: . 2181' 4-1/2" HES HXO SSSV NIP, ID = 3.813" Minimum 10 = 2.635" @ 9562' 3-1/2" HES XN NIPPLE GAS LlFTMANDRELS TVD DBI TYPE V LV LA TCH PORT DA. TE 2999 10 IIIMG RK 5037 47 IIIMG RK 6381 38 KBG2-LS BK 7062 33 KBG2-LS BK 7784 27 KBG2-LS BK 8474 21 KBG2-LS BK 113-3/8" CSG, 72#, L-80, ID=12.347" I 5840' 5848' --i BAKER lXP PKR I TOP OF CEMB'IIT 5995' 5986' IIIILLOUT V\IINOOW 5995' - 6045' 19-518" CSG, 47#, L-80, D = 8.661" I 3-1/2" I-ES X NIP, D - 2.750" -17" X 3-112" BKRSAB-L PKR W/ANCHOR 1 -13-112" HESX NIP, ID =2.750" 1 9562' 9574' 9572' -13-1/2" HES XN NIP, D -2.635" 1 -13-112" W/LEG 1 H ELMD TT LOGGED 06/23/96 TOP OF CEMB'IIT PERFORATION SUIllMARY REF LOG: DIFL ON 01/12/96 ANGLE AT TOP PERF: 41 @ 9802' Note: Refer to Production DB for histori::al perf data SIZE SPF INlERVAL OpnlSqz DA.1E 3-3/8" 6 9802 - 9832 0 01/15/96 2" 8 9630 - 9670 0 02121/96 PBTD 7"LNR,29#,L-80,BTC-WOD,0.0371bpf,ID=6.184" -1 10149' I 19-518" CSG, 47#, L-80, ID= 8.681" 10098' DATE 1982 01/17/96 03/09/01 03/12/01 04/01/02 REV BY SIS-MH SIS-MD RNlTP COMIv£NTS ORIGINAL CONPL EriON SIDETRACK COMPLETON CONVERTED TO CANVAS RNAL CORRECTIONS DA. TE RBI BY COIIIMB'IITS ffiUDHOE BAY UNT WB.L: S-01 B ÆRI\ItIT No: 195-2020 API No: 50-029-20717-02 SEC35, T12N, R12E BP Exploration (Alaska) ON OR BEFORE W ~ _ tA L U N D E--~'E'E'E'E'E'E'E~~R C:LORIg~ILM'DOC /,, O,S C; C: I n d '¥ v '¥ d ~..i a 'i 'v? ~'.'.~ 'J "i G e o i o g 'i c 8 i H ,~-i:: e r" 'i a ] s I n v e n-t.: o r' ,;,' "r-% Itbx'-,tq r,:, Y R H I q '"" ~'- ... .... '.... ~-.., T A T D A T A P L. I J S D I F l... / D A C/' Z [) !.... / G R SEPIA ~,.~"?~ - ) o~ ~, .~ 95.-':,n2 o !5 -- 20 .'.iR 95-202 ...,---b'~. SEPIA ~}'-oo-. 1c3o,-[o 9 i::5 -" 202 95'-202 95 ..... ...-.:'02 95 .... 202 ZD i.../G R PLS (F'IROD/,SAS) SEPIA ~tka~ -I~u~0 ~:::::; E F' Z A 2 8 ~; 0 - 9 7 0 1 ~EpiA 9420.. 8705 7747 9 'J 0 i ,, ~;. 'i !.]/i /2 8/8 'l 0 i,/28/96 '1 07/'i 2/Sl 6 i 0. ?/' i 2 / .;,o ,:.,,':, F I J':.~ A L / 2/' 05 / !it {} i'-'. ...... '[ j'...J/',,I j ''~..../" ri. 5/' .::.,'x' 6 4 5 i ''~ :, ,.:,/" 'J 9 / 8 ,..~l'e dF'~/ i"l O n I:t I I_1_ I I~ G S ~:: I::! ~/I r" El S WELL LOG TRANSMITFAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 cl MWD Formation Evaluation Logs - S-01B December 18, 1996 The technical data listed below is being submitted herewith. Please acknowledge receipt by remming a signed copy of this transmittal letter to the attention of.' Yun Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. APl#: 50-029-20717-02 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company C! !::i I I__1__ I IM G S I::: i::! W I r- El S WELL LOG TRANSMITTAL To: State of Alaska December 5, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs S-01B, AK-MW-60002 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 S-O1B: 2" x 5" ~MD Gamma Ray Logs: 50-029-20717-02 2"x 5" TVD Gamma Ray Logs: 50-029-20717-02 1 Rev Folded 1 Blueline 1 Rev Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE A/(, 99501. Date: 3 July 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PDK FINAL BL+RF 1 PLS FINAL BL+RF ~0-~~ C-16 (30-11-14) ~-~ ~0-~ x-z0 -~ ~A--{{9 S-36 (41-34-12-12) ~ 1 PLS FINAL BL+RF ~.~-~ X-29 (21-12-10-13) ~ 1 PLS FINAL BL+RF 3~-~K D-15 (43-14-11-13)---/ 1 PDK FINAL BL+RF C ~_~ S-01B ----...~.7~.'-' 1 PLS FINAL BL+RF ECC No. Run # 1 868.02 Run # 1 4714.01 Run # 1 5788.08 Run # 1 6139.07 Run # 1 6289.01 Run # 1 6560.03 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 /~Anchorage, AK 99518 Or~~(907) 563-7803 Received by: . ~ Date: RSCEIVED JUL 1 2 1995 Cji & Gas Cons. Comrni~"sion ~chorage HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHOP~AGE AK, 99501. Date: 28 June 1996 RE: Transmittal of Data Sent by: HAND CARRY _ Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 GR/CCL FINAL BL+RF 1 CCL FINAL BL+RF Run # 1 Run # 1 ECC No. 6560.03 6565.03 ReceiVed b~: Please sign and return to: Attn. Ro~ey D. Paulson Weste~ Atlas Logging Services '~' -~ '~' ' '-- 5.600 B Street ' Suite 201 ,. ~chorage, AK 99518 ~ i~,.~O~~° (907) 563-7803 Date: JUL 12 19,,0 &~ci~ora§e STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 95-202 / 96-014 3. Address B. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20717-02 4. Location of well at surface .......... ~ ' ~ 9. Unit or Lease Name 1629' SNL, 756' EWL, SEC. 35, T12N, R12E ~ ~'?:,.i~-~ .::T'~i~ !.Illi;;m~~_ Prudhoe Bay Unit :/_~,~'-~"'?_~ ~ i[~,~~~ 10. Well Number At Top Producing Interval '/ "~ 994' SNL, 1668' WEL, SEC. 34, T12N, R12E :,.~-~- ....... ! 11. Field and Pool At Total Depth -. :L ..... -- '~.:~- ¢ Prudhoe Bay Field/Prudhoe Bay Pool 827' SNL, 1825' WEL, SEC. 34, T12N, R12E 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 70.26 ADL 028258 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 116. No. of Completions 01/05/96 01/12/96 01/17/96 N/A feet MS LI One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 10149'MD/9140'TVD 10040'MD/9058'TVD YES [] NO []I 2181 feet MDI 1900'(Approx.) 22. Type Electric or Other Logs Run MWD, GR, DIFL, ZDL, AC 23. CASING, LINER AND CEMENTING RECORD SE'I-riNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" x 30" Insulated Conductor Surface 110' 36" 8 cu yds concrete 13-3/8" 72# L-80 Surface 2694' 17-1/2" 3720 cuft Arctic Set II 9-5/8" 47# L-80 Surface 5995' / 12-1/4" 1558 cu fl 'G', 130 cu fl Arctic Set I 7" 29# L-80 5840' 10149' ¢. 8-1/2" 906 cu fl Class 'G' 24. Perforations open to Production (MD+TVD of Top and Bottom and '0_5. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" 9492' '> 9517' 3-3/8" Gun Diameter, 6 spf 3-1/2" 9574' ~ MD TVD :26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9802'- 9832 v 8879'- 8902' Freeze Protect with 151 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) January27, 1996 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESlZE IGAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. ORIGINAL Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 30. GEOLOGIC MARKERS FOrlMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 9624' 8745' Shublik 9680' 8787' Sadlerochit 9801' 8878' 31. LIST OF A-I-FACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed .... ,--~ Title Senior Drilling Engineer Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 CsgDep 12750 Surf Well Cum Total VOLUME (BBLS) Method of displosal=pumping down outer annulus NUMBER I MUD/CTGS BRINE WATER COMPLICATIONS, S-05A I 1 2 / 9 / 9 51 I I 811 ii i :. ;:i :: iiii'.i iiiii:::'i:,:~::::~ ~1950 PSI S- 05 A I 12 / 10 / 9 5 I 8 04.001 3 0.00 ii!:i ;. :;! !i:;i; :.i;.ii::i:.i ~:i i::i~i~ 650 PSI S-05A I 12 / 1 1 / 9 5 4 51 I 102.00 i:: iii:i::i :.:ii:i: ?:;i~:i~;.i~ 650 PSI S-05A 12/12 / 9 5 2 5 01 I 193.00 ii:: i i:.! :.'::. :.:~:.:.i:. ;. i:~:.~i~ 650 PSI 125 BBL CMT WASH I NC W/H20 S-05A 12 / 1 3 / 9 51 21 91 I I !:!i:! :: ::::iii!ii ii :;i::;:i::;.i;:.:.i:!i;:~:i:!~i~ 500 PSI S-05A 12 / 14 / 9 51 115.001 I ii:.;;:.::: ~::'::i'.~::: i i:iii:i~.:.i:::.;:.:.i:.ii~.i~:.i~ 550 PSI S-05A 12/1 5/951 201.001 I ii :.il i:: i':!i:.::i ~.iiii!::; ii~i~:~:i~ 500 PSI I S-05A I 12 / 16 / 9 5 0.00 [ I ii i:': i::il;;:.i ::;;: ;: ::;'i ;,: iii:'!~:'i~l NO INJ S-05A I 12/17/95 130.00 I 78.00 ii?~ i ::;:~:~ ?,:.ii:: :::. :.i::?.~i~t 550 PSI S-05A I 1 2/1 8/95 166.001 I i ;: :. ii '. ::~ ;:.~i~:.i~1550 PSI S-05A ! 12 / 1 9 / 9 51 0.001 i I i i:.:: :.' :.i:. i; i::i .:i~t NO INJ S-05A I 12/21/951 i 120.00 :::::::::::::::::::::::::::::::::::~:::::: ::: PSI 100 BBLS CMT WASH H ~.O S-05A 1 2/22/95 470.001 20.00 ii i :; ::.;~;i ~i~1600 S-05A 12 / 2 3 / 9 5 i I 3 2.0 0 550 PSI S-05A 12 / 2 4 / 9 5 i 7 3 3.0 01 14 5.0 0 i i ~: ii:,i i:'i ~ 550 PSI S-05A 12/25/95 105.00I 81.00 550 S-05A 1 2/27/95 35.ooi 210.00 i;;:::;~: i:::;i: :. :::. !: ;,~ 550 PSI 210 BBLS CMT WASH V~ ~,TER S-05A I 12/29/951 I 280.00[ 55O PSI S-05A I 12/30/951 I 560.001 55o PS~ S-05A 12/31 / 9 51 I 2 52.001 550 PSI F/P 152 BBLS S-01 B 1 / 2 / 9 61 I 735.00 550 PSI S-01B 1/3/961 I 764.00 ii;:.;::. :;:.;i:.ii:;i :::iiiiiii:;; :~:;~i~ 550 PSI S-01B 1/4/9 51 417.001 160.00 550 PSI 80 BBL CMT WASH IN(: W/H20 S-01 B 1 / 5 / 9 6 70.001 I 550 PSI S-01B 1/6/9 6 541.001 lO5.00 550 PSI I S-01 B i 1 / 7 / 9 6 68.001 80.00 450 PSI S-01B 1/8/961 234.00[ I I 450 PSI S-01 B 1 / 9 / 9 6 3 50.0 0 I I 500 PSI S-01 B I 1 / 1 0 / 9 6 2 95.00 I I ii :."' ;; :: :. :. ?.i :i i~;;~ 550 PSI S-01 B i 1 / 1 1 / 9 6 187.00 ! II ii :: ~: i i :::::.i'i i: i:.~:~i~ 550 PSI S-01B I 1/1 2/96 0.00 I I S-01 B i 1 / 1 3 / 9 6 0.00 I 275.00 1/1 4/96 207.001 1193.00i 550 PSI 225 BBL CMT WASH INC W/H20 S-01B I S-01 a 1 / 1 5 / 9 6 i 0.001 S-01B I 1/1 6/96 I 378.00l 45.00 !..:.¢ ..i i ::;i:~i:. i:.~:.~iGOt 550 PSI S-01 B 1 / 1 7 / 9 6 I I 160.00 ii:; ii ii:.i!: i:~i:.i;i!::.;: ii ~:.i~i 550 PSI WELL SECURED W/FREEZE PROTECT RECEIVED Anchort, g~, SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX ! ARCO Well Name: Accept Date: S-01B Rig Name: Nabors 28E AFE: 01/01/96 Spud Date: 01/06/96 Release Date: 4P0746 01/17/96 Jan 2 1996 (1) Retrieved Hanger plug. Serviced High pressure lines. Held safe- ty meeting. Circulated at 6401 ft. Held safety meeting. In- stalled Hanger plug. Removed Xmas tree. Rigged up All func- tions. Rigged up Instrument lines. Held safety meeting. Tested All functions. Retrieved Hanger plug. Rigged down Bell nipple. Rigged up Bell nipple. Jan 3 1996 (2) Rigged up Bell nipple. Installed Tubing retrieval string. Held safety meeting. Retrieved Tubing hanger. Circulated at 6401 ft. Rigged up Tubing handling equipment. Laid down Tubing to 1800 ft. Repaired Tubing handling equipment. Laid down Tubing to 2200 ft. Rigged down Tubing handling equipment. Laid down Tub- ing to 6401 ft. Rigged down Tubing handling equipment. In- stalled VR plug. Tested Annulus flowline valve - manual. Re- moved Annulus flowline valve- manual. Removed Seal assembly. Installed Seal assembly. Tested Kelly cocks. Installed Bore protector. Singled in drill pipe to 3400 ft. Jan 4 1996 (3) Singled in drill pipe to 6250 ft. Functioned downhole tools at 6250 ft. Tested Casing - Via annulus and string. Circulated at 6250 ft. Held safety meeting. Circulated at 6250 ft. Pulled out of hole to 30 ft. Pulled BHA. Made up BHA no. 2. R.I.H. to 5995 ft. Held safety meeting. Cut Casing at 6045 ft. Circu- lated at 6045 ft. Pulled out of hole to 2500 ft. Operations Summary for: S-0._. Jan 5 1996 (4) Pulled out of hole to 300 ft. Pulled BHA. Held safety meeting. Serviced Flowline. Made up BHA no. 3. R.I.H. to 6143 ft. Cir- culated at 6143 ft. Batch mixed slurry- 55.7 bbl. Held safety meeting. Mixed and pumped slurry - 55 bbl. Displaced slurry - 85 bbl. Pulled out of hole to 4748 ft. Held 725 psi pressure on 28.5 bbl squeezed cement. Pulled out of hole to 30 ft. R.I.H. to 1400 ft. Laid down 1400 ft of 5 in OD drill pipe. Serviced Flowline. Made up BHA no. 4. Held safety meeting. Made up BHA no. 4. Wait on cement. Jan 6 1996 (5) Wait on cement. Made up BHA no. 4. R.I.H. to 5370 ft. Washed to 5815 ft. Serviced Kelly/top drive hose. Washed to 5995 ft. Drilled to 6050 ft. Drilled to 6099 ft. Circulated at 6099 ft. Drilled to 6410 ft. Jan 7 1996 (6) Drilled to 6857 ft. Circulated at 6857 ft. Pulled out of hole to 70 ft. Pulled BHA. Made up BHA no. 5. Serviced Rotary table. Held safety meeting. R.I.H. to 6857 ft. Drilled to 7779 ft. Jan 8 1996 (7) Drilled to 7942 ft. Circulated at 7942 ft. Pulled out of hole to 90 ft. Pulled BHA. Made up BHA no. 6. Serviced Drillfloor / Derrick. R.I.H. to 5995 ft. Held safety meeting. Serviced Block line. R.I.H. to 7942 ft. Drilled to 8350 ft. Jan 9 1996 (8) Drilled to 8502 ft. Held safety meeting. Pulled out of hole to 3000 ft. Held safety meeting. Held safety meeting. Pulled out of hole to 90 ft. Pulled BHA. Serviced Drillfloor / Derrick. Held safety meeting. Retrieved Bore protector. Installed BOP test plug assembly. Tested All functions. Retrieved BOP test plug assembly. Installed Bore protector. R.I.H. to 8502 ft. Drilled to 8642 ft. Serviced Liner. Drilled to 8685 ft. Jan 10 1996 (9) Drilled to 9233 ft. Serviced Suction valve. Drilled to 9445 ft. Page 2 Operations Summary for: S-0,.~ Jan 11 1996 (10) Drilled to 9700 ft. Circulated at 9700 ft. Pulled out of hole to 5838 ft. Flow check. R.I.H. to 9160 ft. Circulated at 9160 ft. Washed to 9700 ft. Circulated at 9700 ft. Pulled out of hole to 600 ft. Pulled BHA. Jan 12 1996 (11) Pulled BHA. Installed Wear bushing. Made up BHA no. 8. to 9700 ft. Drilled to 10149 ft. Circulated at 10149 ft. Pulled out of hole to 9150 ft. R.I.H. to 10149 ft. Circulated at 10149 ft. Pulled out of hole to 5900 ft. Flow check. Jan 13 1996 (12) Pulled out of hole to 600 ft. Pulled BHA. Installed Wear bush- ing. Rigged up Logging/braided cable equipment. Ran electric logs. Rigged down Logging/braided cable equipment. Made up BHA no. 9. R.I.H. to 5995 ft. Serviced Block line. R.I.H. to 9105 ft. Opened hole to 10149 ft (8.5 in). Circulated at 10149 ft. Jan 14 1996 (13) Circulated at 10149 ft. Pulled out of hole to 560 ft. Pulled BHA. Rigged up Casing handling equipment. Ran Casing to 4309 ft (7 in OD). Circulated at 4400 ft. Ran Casing on landing string to 10149 ft. Circulated at 10149 ft. Pumped spacers - volume 90 bbl. Displaced slurry - 257 bbl. Reverse circulated at 5840 ft. Pulled Drillpipe in stands to 1000 ft. Jan 15 1996 (14) Pulled Drillpipe in stands to 0 ft. Rigged up Drillstring han- dling equipment. Made up BHA no. 10. Singled in drill pipe to 4266 ft. R.I.H. to 9936 ft. Washed to 10040 ft. Circulated at 10040 ft. Tested Casing - Via annulus and string. Held safety meeting. Reverse circulated at 10040 ft. Laid down 10040 ft of 5 in OD drill pipe. Retrieved Wear bushing. Removed Seal assem- bly. Installed Seal assembly. Page 3 Operations Summary for: S-0,.., Jan 16 1996 (15) Installed Seal assembly. Rigged up Tubing handling equipment. Held safety meeting. Ran Tubing to 180 ft (3.5 in OD). Laid down Tubing to 0 ft. Rigged down Tubing handling equipment. Serviced Draw works. Rigged up Lubricator. Perforated. Rigged down Logging/braided cable equipment. Rigged up Completion string handling equipment. Held safety meeting. Ran Tubing to 9574 ft (4.5 in OD). Circulated at 9574 ft. Jan 17 1996 (16) Ran Tubing on landing string to 9574 ft. Set packer at 9519 ft with 1500 psi. Conducted slickline operations on Slickline equipment- Retrival run. Rigged down BOP stack. Installed Xmas tree. Retrieved BOP test plug assembly. Tested Permanent pack- er. Freeze protect well - 151 bbl of Diesel. Jan 18 1996 (17) Installed BOP test plug assembly. Serviced Surface tree. Page 4 Ar~ch0rs9,~ ~ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/S-01B 500292071702 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 2/96 DATE OF SURVEY: 011296 MWD SURVEY JOB NUMBER: AK-MW-60002 KELLY BUSHING ELEV. = 70.26 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 5903.88 5265.30 5195.04 47 25 6000.00 5331.36 5261.10 45 44 6082.36 5391.55 5321.29 40 17 6143.23 5438.11 5367.85 39 54 6175.01 5462.51 5392.25 39 47 N 78.38 W .00 191.09N 1714.25W N 79.07 W 1.82 204.74N 1782.71W N 80.35 W 6.69 214.81N 1837.97W N 81.40 W 1.29 221.03N 1876.68W N 78.70 W 5.45 224.54N 1896.73W 1697.29 1766.79 1822.62 1861.49 1881.71 6206.71 5487.20 5416.94 37 54 6238.76 5512.94 5442.68 35 12 6270.45 5539.29 5469.03 32 17 6300.46 5564.78 5494.52 31 23 6333.08 5592.81 5522.55 30 6 N 79.70 W 6.31 228.27N 1916.26W N 77.30 W 9.53 232.07N 1934.96W N 79.20 W 9.74 235.66N 1952.19W N 79.20 W 3.00 238.63N 1967.74W N 79.80 W 4.09 241.67N 1984.14W 1901.49 1920.50 1938.04 1953.79 1970.37 6364.58 5620.44 5550.18 27 17 6427.39 5677.31 5607.05 22 53 6490.41 5736.39 5666.13 17 42 6555.24 5799.03 5728.77 12 0 6618.34 5861.19 5790.93 7 48 N 81.60 W 9.30 244.12N 1999.06W N 84.30 W 7.24 247.44N 2025.49W N 86.50 W 8.34 249.25N 2047.27W N 82.00 W 8.96 250.79N 2063.79W N 67.00 W 7.76 253.38N 2074.23W 1985.37 2011.64 2033.03 2049.30 2060.05 6683.75 5926.20 5855.94 6777.33 6019.64 5949.38 6874.76 6117.05 6046.79 6971.05 6213.32 6143.06 7064.25 6306.51 6236.25 5 0 1 6 1 12 0 54 0 54 N 46.10 W 5.50 257.09N 2080.38W N 8.50 E 4.76 260.81N 2083.18W N 65.40 E 1.13 262.16N 2082.12W N 67.20 E .31 262.87N 2080.50W N 62.80 E .08 263.49N 2079.18W 2067.00 2070.75 2070.11 2068.77 2067.68 7157.18 6399.41 6329.15 7252.82 6495.01 6424.75 7347.05 6589.19 6518.93 7442.67 6684.78 6614.52 7537.72 6779.82 6709.56 1 42 1 42 1 54 1 6 0 18 N 67.60 E .87 264.35N 2077.25W N 55.80 E .36 265.68N 2074.77W N 53.50' E .23 267.40N 2072.36W N 40.30 E .91 269.04N 2070.49W N 12.20 W 1.00 269.98N 2069.95W 2066.08 2064.08 2062.26 2060.94 2060.70 7632.30 6874.40 6804.14 0 24 7725.84 6967.93 6897.67 0 24 7821.31 7063.40 6993.14 0 24 7853.53 7095.62 7025.36 0 18 7945.80 7187.89 7117.63 0 18 N 47.60 W .25 270.44N 2070.25W N 39.00 W .06 270.92N 2070.69W N 54.40 W .11 271.37N 2071.18W N 55.00 W .31 271.49N 2071.34W N 89.40 W .19 271.63N 2071.78W 2061.11 2061.68 2062.27 2062.45 2062.91 8041.48 7283.57 7213.31 0 36 8136.00 7378.08 7307.82 0 54 8231.56 7473.62 7403.36 1 23 8327.72 7569.76 7499.50 0 12 8422.72 7664.76 7594.50 0 48 S 47.50 W .45 271.29N 2072.40W S 46.60 W .32 270.45N 2073.30W S 49.10 W .53 269.17N 2074.73W S 13.70 E 1.37 268.23N 2075.58W N 66.20 E .90 268.34N 2074.93W 2063.41 2064.04 2065.04 2065.59 2065.00 ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/S-01B 500292071702 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 2/96 DATE OF SURVEY: 011296 MWD SURVEY JOB NUMBER: AK-MW-60002 KELLY BUSHING ELEV. = 70.26 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 8524.16 7766.19 7695.93 8620.08 7862.10 7791.84 8716.36 7958.37 7888.11 8780.23 8022.24 7951.98 8811.48 8053.47 7983.21 0 48 0 42 0 42 0 42 3 17 N 70.80 E .06 268.86N 2073.61W N 70.50 E .10 269.27N 2072.43W N 79.50 E .11 269.58N 2071.30W N 19.60 E 1.09 270.02N 2070.78W N 26.00 W 9.13 271.01N 2071.11W 2063.88 2062.87 2061.87 2061.50 2062.10 8841.78 8083.66 8013.40 6 24 8873.70 8115.29 8045.03 8 41 8907.20 8148.24 8077.98 12 6 8936.78 8177.02 8106.76 14 30 8969.28 8208.39 8138.13 15 41 N 30.40 W 10.30 N 31.40 W 7.22 N 33.60 W 10.22 N 35.70 W 8.27 N 38.70 W 4.41 273.25N 2072.35W 276.84N 2074.51W 281.93N 2077.77W 287.52N 2081.65W 294.26N 2086.77W 2063.93 2067.02 2071.61 2076.92 2083.76 9000.22 8238.02 8167.76 9032.49 8268.48 8198.22 9063.63 8297.35 8227.09 9094.81 8325.74 8255.48 9127.32 8354.84 8284.58 17 47 20 42 23 17 25 30 27 23 N 41.20 W 7.17 N 43.00 W 9.17 N 44.80 W 8.62 N 45.00 W 7.06 N 45.40 W 5.87 301.08N 2092.50W 308.96N 2099.64W 317.36N 2107.74W 326.48N 2116.83W 336.68N 2127.10W 2091.20 2100.30 2110.46 2121.77 2134.54 9158.65 8382.41 8312.15 29 17 9190.57 8410.01 8339.75 31 0 9222.95 8437.50 8367.24 32 47 9254.40 8463.66 8393.40 34 35 9286.69 8489.88 8419.62 36 47 N 45.20 W 6.07 N 45.10 W 5.33 N 44.00 W 5.84 N 44.20 W 5.73 N 43.90 W 6.83 347.15N 2137.68W 358.45N 2149.04W 370.65N 2161.04W 383.18N 2173.18W 396.72N 2186.28W 2147.66 2161.79 2176.77 2191.99 2208.41 9318.56 8515.17 8444.91 38 5 9350.40 8540.32 8470.06 37 35 9382.30 8565.55 8495.29 37 47 9414.69 8590.88 8520.62 39 17 9446.02 8614.62 8544.36 42 12 N 43.60 W 4.12 N 44.40 W 2.20 N 45.30 W 1.84 N 47.10 W 5.78 N 46.50 W 9.34 410.72N 2199.68W 424.77N 2213.25W 438.60N 2227.01W 452.56N 2241.58W 466.56N 2256.48W 2225.26 2242.28 2259.42 2277.37 2295.66 9478.32 8638.33 8568.07 9510.27 8661.60 8591.34 9542.12 8684.90 8614.64 9574.59 8708.82 8638.56 9606.58 8732.52 8662.26 43 17 43 12 42 47 42 17 42 5 N 46.00 W 3.56 N 45.20 W 1.74 N 44.90 W 1.41 N 45.20 W 1.66 N 45.20 W .62 481.73N 2272.32W 497.04N 2287.96W 512.39N 2303.33W 527.90N 2318.87W 543.04N 2334.12W 2315.17 2334.54 2353.66 2372.99 2391.93 9636.88 8755.05 8684.79 9674.01 8782.82 8712.56 9737.15 8830.18 8759.92 9799.17 8876.84 8806.58 9862.39 8924.45 8854.19 41 47 41 24 41 24 41 0 41 17 N 45.30 W 1.01 N 43.80 W 2.89 N 44.20 W .42 N 44.90 W .98 N 43.40 W 1.63 557.30N 2348.50W 574.87N 2365.80W 604.90N 2394.80W 634.02N 2423.46W 663.86N 2452.43W 2409.79 2431.38 2467.77 2503.56 2539.86 ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBU/S-01B 500292071702 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 2/96 DATE OF SURVEY: 011296 MWD SURVEY JOB NUMBER: AK-MW-60002 KELLY BUSHING ELEV. = 70.26 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 9925.40 8971.82 8901.56 41 12 N 43.60 W .26 9990.74 9020.87 8950.61 41 30 N 42.90 W .84 10052.47 9067.10 8996.84 41 30 N 42.10 W .86 10084.22 9090.94 9020.68 41 12 N 42.90 W 1.91 10149.00 9139.68 9069.42 41 12 N 42.90 W .00 694.00N 2481.03W 2575.88 725.44N 2510.61W 2613.21 755.60N 2538.24W 2648.32 771.06N 2552.41W 2666.32 802.32N 2581.46W 2703.09 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 2703.26 FEET AT NORTH 72 DEG. 44 MIN. WEST AT MD = 10149 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 286.62 DEG. TIE IN POINT 5903.88' WINDOW POINT 6000' INTERPOLATED DEPTH 10149' ERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/S-01B 500292071702 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 2/96 DATE OF SURVEY: 011296 JOB NUMBER: AK-MW-60002 KELLY BUSHING ELEV. = 70.26 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 5903.88 5265.30 5195.04 6903.88 6146.16 6075.90 7903.88 7145.97 7075.71 8903.88 8144.99 8074.73 9903.88 8955.63 8885.37 191.09 N 262.41 N 271.62 N 281.36 N 683.73 N 1714.25 W 638.58 2081.56 W 757.72 119.14 2071.56 W 757.91 .19 2077.39 W 758.89 .98 2471.25 W 948.25 189.36 10149.00 9139.68 9069.42 802.32 N 2581.46 W 1009.32 61.07 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. RECEIVED Alaska &. ~RRY-SUN DRILLING SERVICES ANCHOR3~GE ALASKA PAGE SHARED SERVICES DRILLING PBU/S-01B 500292071702 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 2/96 DATE OF SURVEY: 011296 JOB NUMBER: AK-MW-60002 KELLY BUSHING ELEV. = 70.26 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 5903.88 5265.3 5911.21 5270.2 6053.99 5370.2 6185.07 5470.2 0 5195.04 6 5200.00 6 5300.00 6 5400.00 6306.87 5570.2 6419.71 5670.2 6525.67 5770.2 6627.49 5870.2 6727.92 5970.2 6 5500.00 6 5600.00 6 5700.00 6 5800.00 6 5900.00 6827.96 6070.2 6927.99 6170.2 7028.00 6270.2 7128.02 6370.2 7228.06 6470.2 6 6000.00 6 6100.00 6 6200.00 6 6300.00 6 6400.00 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 191.09 N 192.18 N 211.58 N 225.79 N 1714.25 W 1719.54 W 1819.50 W 1903.03 W 239.24 N 247.12 N 250.00 N 253.87 N 259.31 N MD-TVD VERTICAL DIFFERENCE CORRECTION 261.73 N 262.61 N 263.23 N 264.02 N 265.27 N 638.58 640.95 2.37 683.73 42.78 714.81 31.08 1971.00 W 736.61 21.79 2022.45 W 749.45 12.84 2057.01 W 755.41 5.96 2075.31 W 757.23 1.82 2082.44 W 757.66 .44 2082.98 W 757.70 .04 2081.13 W 757.73 .02 2079.68 W 757.74 .01 2078.05 W 757.76 .02 2075.38 W 757.80 .04 7328.11 6570.2 7428.15 6670.2 7528.16 6770.2 7628.16 6870.2 7728.17 6970.2 7828.17 7070.2 7928.17 7170.2 8028.17 7270.2 8128.18 7370.2 8228.20 7470.2 8328.22 7570.2 8428.22 7670.2 8528.23 7770.2 8628.24 7870.2 8728.25 7970.2 8828.32 8070.2 8929.80 8170.2 9034.42 8270.2 9144.72 8370.2 9262.42 8470.2 9388.28 8570.2 6 6500.00 6 6600.00 6 6700.00 6 6800.00 6 6900.00 6-7000.00 6 7100.00 6 7200.00 6 7300.00 6 7400.00 6 7500.00 6 7600.00 6 7700.00 6 7800.00 6 7900.00 6 8000.00 6 8100.00 6 8200.00 6 8300.00 6 8400.00 6 8500.00 267.02 N 268.83 N 269.93 N 270.43 N 270.93 N 271.40 N 271.63 N 271.38 N 270.53 N 269.22 N 268.23 N 268.37 N 268.88 N 269.31 N 269.60 N 272.14 N 286.10 N 309.50 N 342.34 N 386.44 N 441.18 N 2072.86 W 757.85 .05 2070.67 W 757.89 .04 2069.94 W 757.90 .01 2070.23 W 757.90 .00 2070.70 W 757.91 .00 2071.21 W 757.91 .00 2071.68 W 757.91 .00 2072.29 W 757.91 .00 2073.21 W 757.92 .01 2074.67 W 757.94 .02 2075.58 W 757.96 .01 2074.86 W 757.96 .01 2073.56 W 757.97 .01 2072.33 W 757.98 .01 2071.15 W 757.99 .01 2071.72 W 758.06 .08 2080.63 W 759.54 1.48 2100.17 W 764.16 4.62 2132.84 W 774.46 10.29 2176.36 W 792.16 17.70 2229.65 W 818.02 25.86 RECEIVED MAR 2 6 1996 Alaska Oil & Gas Oons. C~mmission Anehoragc.,,' &~ JRRY-SUN DRILLING SERVICES ANCHOPJ%GE ALASKA r . PAGE SHARED SERVICES DRILLING PBU/S-01B 500292071702 NORTH SLOPE BOROUGH COMPUTATION DATE: 2/ 2/96 DATE OF SURVEY: 011296 JOB NUMBER: AK-MW-60002 KELLY BUSHING ELEV. = 70.26 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9522.14 8670.26 8600.00 502.77 N 2293.73 W 851.88 33.86 9657.25 8770.26 8700.00 566.90 N 2358.06 W 886.99 35.10 9790.45 8870.26 8800.00 629.96 N 2419.42 W 920.19 33.20 9923.33 8970.26 8900.00 693.01 N 2480.09 W 953.07 32.88 10056.69 9070.26 9000.00 757.67 N 2540.11 W 986.43 33.36 10149.00 9139.68 9069.42 802.32 N 2581.46 W 1009.32 22.90 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS RECEIVED MAP, 2 6 '1996 AIs~kia Oil & Gas Cons. Commission Anellclrage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 27 February 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: Z-22A (32-12-11-11) 1 CCL FINAL BL+RF S-01B 1 PFC/PERF FINAL BL+RF 1 GR/CCL FINAL BL+RF ECC No. Run # 1 6065.06 Run # 1 6560.02 Run # 1 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: ~ ~~~ Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 19 January 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL S-01B O73 DESCRIPTION 1 LDWG TAPE+LIS ECC No. Run #. 1 6533.00 1 LDWG TAPE+LIS Run # 1 6560.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Received by __ Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 17 January 1996 RE: Transmittal of Data Sent by: H/~ND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL '70- -'&b DESCRIPTION 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF ECC No. Run # 1 3562.02 Run # 1 4060.05 Run # 1 5798.13 Run # 1 5852.03 Run # 1 6560.01 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, hi< 99518 to (907) 563-7803 Received by: ~ , . LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Dear Sir/Madam, Reference: BP S-01B PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: Date: RE: 1 ZDL FINAL BL+RF Run # 1 1 DIFL FINAL BL+RF Run # 1 1 DAC FINAL BL+RF Run # 1 1 BH PRO FINAL BL+RF Run # 1 1 SSVD FINAL BL+RF Run # 1 17 January 1996 Transmittal of Data ECC #: 6560.00 Sent by: HAND CARRY Data: OH-LDWG Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 to (907) 563-7803 Received by: Date: Oil & Gas Corts. Corr,~missiorl Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISS~uN APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging .__ Time extension __ Stimulate __ Change approved program, x Pull tubing __ Variance __ Perforate __ Other __ 2. Name of Operator BP Exploration 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development x Exploratory Stratigraphic __ Service 6. Datum elevation (DF or KB) KBE = 71.6 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 8. ORIGINAL 1629' SNL, 756' EWL, SEC. 35, T12N, R12E At top of productive interval 9. 995' SNL, 1668' WEL, SEC. 34, T12N, R12E At effective depth 10. At total depth 827' SNL, 1826' WEL, SEC. 34. T12N, R12E Well number S-01B Permit number 95-202 APl number 50- 029-20717-02 11. Field/Pool Prudhoe Bay Field/Oil Pool feet 12. Present well condition summary Total depth: measured Effective depth: Casing Structural Conductor 110' Surface 2665' Intermediate 5966' Production 4309' Liner Perforation depth: measured 10149 feet true vertical 9140 feet measured feet true vertical feet Length Size 20 X 30 13-3/8" 9-5/8" 7" true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) Plugs (measured) Junk (measured) Cemented Measured depth True vertical depth 8 cu yds 139' 139' 3720 cu ft 2694' 2694' 1688 cu ft 5995' 5258' 907 cuft Class 'G' 10149' 9140' JAN t 6 199C ~ask~ 0il & Ga~ Cons. Commission Anchorage 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation January 13, 1996 16. If proposal was verbally approved Name of approver B/air Wondzel/ 1/13/96 Date approved 15. Status of well classification as: Oil X Gas Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ,y~?~ /~~~4~ TitleSeniorDrillingEngineer FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity_ BOP Test ~ Location clearance Mechanical Integrity Test~ Sub~l~l~J~i~tlf(:~r~r. cj~i~ 10- ~o 7 David W. Johnston Approved by order of the Commission Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE Pilot Hole Completion Summary DISCUSSION Based on open hole log interpretations of >75' NLOC (+108' exclusive of the Sag River) encountered in the S-O1B pilot hole, the S-Pad asset team requested that the pilot hole be completed as is without further delay. The scope of the path forward shall include running 7" liner, perforations via electric line and 4-1/2" x 3-1/2" completion assembly. Further completion acitivities will commence (through tubing) at a later date. Final completion details will follow. I Well Name: I Type of Well (producer or injector): IS-olB I IPr°ducer I Surface Location: 1,629' FNL, 756' FWL Sec 35 T12N R12E Pilot Hole Completion Bottom Hole Location: [ 786' FNL, 1,811' FEL Sec 34 T12N R12E I nF~Number: 14P0746.0 I ling: I Nabors 28-E I I Estimated Comp Date: I 1-15-96 I I Operating days to complete: I 15 I I MD: 110,149' II TVD: 19,139' II KBE-MSL 71.6' I Well Design (conventional,sHmhole,etc.) I Pilot Hole ,,.. Formation Markers: '" ~ !/'i:D Formation Tops MD TVD (SS) CM-3 (K-10) 6,055' 5,371' KOP in K-10 @ _+6,600' HRZ '7,187' 6,440' LCU 7,372' 6,625' Kuparuk 7,420' 6,592' WLM Kingak 8,272' 7,444' WLM Sag River 9,626' 8,680' WLM S hublik 9,680' 8,715' WLM Sadlerochit 9,801' 8,809' WLM TD 10,149' 9,069' WLM 'o,qo '"'*:S~ion Casing Program: Hole Size Csg/ Wt/Ft Grade Conn Length Top '" Btm Tbg O.D. MD/TVD MD / TVD 8-1/2" 7" 29# L-80 NSCT 4,309' 5,840'/5,881' _+10,149'/9,139' , ementing Program: Lead Cement Tail Cement Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments Class G, FW=0, FL=<50 cc 7" None 775 / 15.7 / 1.17 Pump time=4+ hrs; TOC = 8,458' MD (Planned TOC at liner top) Volume assumptions: Gauge hole + 50% excess; 80' shoe joint; TOC at liner top. Logging Program: I Open Hole Logs: 8-1/2" Hole Cased Hole Logs: 9-5/8" Casing GR/DIFL/ZDL/AC; No RFI"s run due to poor hole conditions None Planned Mud Program: Intermediate Mud Properties: I 8-1/2" hole section to Pilot Hole TD Depth Density Marsh Yield 10 sec 10 rain pH Fluid (PPG) Viscosity Point gel gel Loss 6,000' 9.6-9.7 40-50 12-15 4-8 8-12 9-10 <6 HTHP-15.0 10,149' 10.3 50-60 20-30 10-12 12-16 9-10 <6 Csg Point HTHP- 15.0 Directional: I KOP: I +6,000' MD (+47° at sidetrack depth) Maximum Hole Angle: _+43.2° in pilot hole Tangent Angle _+41.0° through S adlerochit Close Approach Well: None. LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 19 December 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION S~-i9~ C-28 (32-30-11-14) ~/-©17- F-06 '7 -o1 -o7 S-O1R 1 CN FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 CCL FINAL BL+RF ECC No. Run # 1 1590.03 Run # 1 4050.07 Run # 1 4706.03 Run # 1 6534.00 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 ALASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLE$, GOVERNOF~ 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 December 18, 1995 Dan Stoltz, Senior Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Well # Oompany Permit # Surf Loc Btmhole Loc Prudhoe Bay Unit S-01B BP Exploration (Alaska), Inc. 95-202 - 1629'SNL, 756'EWL, Sec 35, T12N, R12E, UM 196'NSL, 918'EWL, Sec 27, T12N, R12E, UM Dear Mr. Stoltz: Enclosed is the approved application.for permit to re-ddll the above referenced well. The permit to re-drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting re-drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling a new hole. Notice may be given by contacting the Commission's petroleum field inspector on the North Slope pager at 659-3607. dlf/enci c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] RedrillCi lb. Type of well. Exploratoryl-1 Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen[] Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration Plan RTE= 70.9 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. 0. Box 196612, Anchorage, Alaska 99519-6612 ADL 028258 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 1629' SNL, 756' EWL, SEC. 35, T12N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 636' SNL, 2093' WEL, SEC. 34, T12N, R12E S-01B 2S100302630-277 At total depth 9. Approximate spud date Amount 196' NSL, 918' EWL, SEC. 27, T12N, R12E 12/30/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and'rVD) property line ADL 028256 196 feet No Close Approach feet 2560 12738' MD/9001' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 6000 feet Maximum hole angle 9o o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD -I-VD M D TVD (include stage data) 8-1/2" 7" 29# L-80 NSCT 1450' 6450' 5708' 10336' 8917' 320 sx Class 'G' 6" 4-1/2" 12. 6# L-80 NSCT 2400' 10188' 8900' 12738' 9001' Uncemented Slotted Liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Oonductor Surface Intermediate O~.C 1 2 '~ Production Lin e r Nask80ii & G-~s Cor~$. Com,missiort Perforation depth: measured /~,chorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby ce)~t~/that~ ~the/f'C-e/g'pin/¢ i~'t.rue an.~d, correct to the best of my knowledge /2- Signed ,,~~? _~~ Title Senior Drillin~l En~lineer Date ~-'"' Commission Use Only P.~_it Number APl number Approval date See cover letter ~0 ~ 50-C~2_~/--2 ~-?'/7-0 :2- / ~- /~~ for other requirements Conditions of approval Samples required [] Yes ~] No Mud Icg required []Yes j~ No Hydrogen sulfide measures ;J~ Yes [] No Directional survey required ~ Yes [] No Required working press~[~c.~'l~.lB~;~dl~M; FI3M; ~5M; I-I10M; I-I15M; Other: 0avid W. Johnston by order of ~,/o~/ Approved by Commissioner tne commission Date/ Form 10-401 Rev. 12-1-85 Submit in Well N_.me: ] S-O1B / S-01BL1 [ Sidetrack Plan Summary I Type of Well (producer or injector): I Producer Surface Location: I 1,629' FNL, 756' FWL Sec 35 T12N R12E I Sadlerochit - Zone 4 Lateral (S-01B) 1st Lateral Target Location: 636' FNL, 2,093' FEL Sec 34 T12N R12E (start of horz - 1st lateral) Bottom Hole Location: 196' FSL, 918' FWL Sec 27 T12N R12E (end of horz - 1st lateral) Sag River Lateral (S-01BL1) 2nd Lateral Target Location: 1 720' FNL, 1,961' FEL Sec 34 T12N R12E (start of horz - 2nd lateral) Bottom Hole Location:I 189' FSL, 915' FWL Sec 27 T12N R12E (end of horz - 2nd lateral) I AFENumber: 14P0746.0 I I Rig: INab°rs 28-E ~' I I Estimated Start Date: I 12-30-95 I ] Operating days to complete: I 27 [ I RT-GL I 33.8' I IMD: I12,738' I ITVD: 19,001' I I KBE-MSL 71.6' Well Design (conventional,sHmhole,etc.) I Horizontal Sidetrack (Multi-lateral) Formation Markers'. Formation Tops MD TVD (SS) CM-3 (K-10) 6,055' 5,371' KOP in K-10 @ HRZ '7,187' 6,440' LCU 7,372' 6,625' Kingak 8,272' 7,525' Sag River (pilot hole) 9,623' 8,759' Pilot hole only Shublik (pilot hole) 9,679' 8,802' Pilot hole only Sadlerochit (pilot hole) 9,803' 8,897' Pilot hole only TD (pilot hole) 10,115' 9,135' Pilot hole only Sag River 9,751' 8,759' Shublik 9,853' 8,802' Sadlerochit 10,190' 8,897' p4aska L~t & G~ /mchorage Casing/Tubing Program: Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD / TVD 8-1/2" 7" 29# L-80 NSCT 1,450' _6,450'/5,708' _10,336'/8,917' 6" 4-1/2" 12.6# L-80 NSCT 2,400' 10,188'/8,900' +_12,738'/9,001' (lst Lateral) 6" 4-1/2" 12.6# L-80 NSCT 2,918' 9,775'/8,767' +12,714'/8,800' (2nd Lateral) Tubing 4-1/2" 12.6# L-80 NSCT 9,717' 33'/33' +_9,750'/8,758' ¢menting Program: Lead Cement Tail Cement Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments Class G, FW=0, FL=<50 cc 7" None 320 / 15.7 / 1.17 Pump time--4+ hrs; TOC = 8,458' MD (1,048' TVD above Sag River) 4-1/2" None None Slotted liner (1 st Lateral) 4-1/2" None None Slotted liner (2nd Lateral) Volume assumptions: Gauge hole + 50% excess; 80' shoe joint; TOC at liner top. Logging Program: Open Hole Logs: 8-1/2" Hole 6" Hole Cased Hole Logs: GR/SFL, II,M, ILD/sonic/density; RFT's contingent upon hole conditions MWD: Resistivity/GR in both horizontal intervals 9-5/8" Casing None Planned Mud Program: Intermediate Mud Properties: I 8-1/2" hole section to horizontal: LSND Depth Density Marsh Yield 10 sec 10 rain pH Fluid (PPG) Viscosity Point gel gel Loss 6,000' 9.6-9.7 40-50 12-15 4-8 8-12 9-10 <6 HTHP-15.0 8,100' 9.8+ 50-60 20-30 10-12 12-16 9-10 <6 _+150' above HTHP-15.0 Kingak 10,336' 9.8+ 50-60 20-30 10-12 12-16 9-10 <6 Csg Point HTHP- 15.0 Hazards/Concerns Utilize alternating lo / hi vis sweeps to assist hole cleaning Treat with 2 ppb each of Boreplate, Barotrol, & Baranex while drilling Kingak. Monitor LSYP and increase if problems occur trying to clean the hole. Potential high torque could need lubricant use. Lost circulation is probable due to anticipated faulting in Kingak. Reduce AP1 fluid loss to <6 cc in Kingak Section. Production Mud Properties: 16" hole sections: Xanvis KCL Depth I Density [ Marsh Yield 10 sec 10 rain Fluid (MD)I (PPG)I Viscosity Point gel gel pH Loss Sadlerochit Zone 4 Lateral 10,336' 8.8-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 12,738' 8.8-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 Sag River Lateral 9,765' I 8.8-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 12,714'I 8.8-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 Hazards/Concerns Lost Circulation a possibility due to possible faulting in Sadlerochit in 1st lateral; Faults may also be encountered in the Sag River in 2nd lateral. Differential sticking possible (overbalance) - both laterals. Perform/report daily checks on KC1 concentrations in Xanvis KC1 system. High torque may be experienced and should be treated with Lubtex additions. Oirect/onal: The above listed wells will be secured during the close approach. Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and dr/lling fluid system schematics on file with AOGCC. RECE V L.¢ OEC 12 1995 Alaska Oil & Gas Cons. Commission Anchorage disposal: Cuttings Handling: Fluid Handling: Annular Injection: CC2A Annular injection. As the S-lB annulus is not available for injection (cemented off), approval is hereby requested for annular injection into the following nearby wells (previously approved for injection by ADEC in 1990 and 1992, respectively). Additionally, these wells were recently approved for annular injection on the S-5A Drilling Permit. Cumulative total limitations will remain in effect. PREV. VOLUME MAX. PERMITFED MAX. PERMITTED PERMITFED AREA WELL INJECTED VOLUME FLUID DENSITY DATES (BBLS) (aBES) (PPG) VVOA S-24 7,701 35,000 17.0 11/21/95-11/21/96 S-33 4,904 35,000 17.0 11/21/95-11/21/96 . . . , . Aquifers in the Prudhoe Bay Field Western Operating Area have been exempted from Class II injection activities by the AOGCC by Aquifer Exemption Order #1 as referenced in Area Injection Order #3. There are no domestic or industrial use water wells located within one mile of the project area. The following design criteria were utilized in determination of maximum annular injection pressures (the attached pressure homograph provides injection pressure vs. fluid density data): S-24 13-5/8", 68#, L-80 set and cemented at 2,668' MD (2,668' TVD) Burst (80%) = 2,760 psi 9-5/8", 47#, L-80 set and cemented at 9,843' MD Collapse (80%) = 3,800 psi S-33 10-3/4", 45.5#, NT-80 set and cemented at 2,958' MD (2,958' TVD) Burst (80%) - 2,864 psi 7-5/8", 29.7#, NT-95HS set and cemented at 9,018' MD Collapse (80%) = 4,096 psi A determination has been made that the pumping operation will not endanger the integrity of the well being drilled by the submission of data to AOGCC on 10/30/95 which demonstrates the confining layers, porosity and permeability of the injection zone. The cement design for these wells (and the subject S-5A well) ensures that annular pumping into hydrocarbon zones will not occur. Worse case scenario calculations assume 17.0 ppg maximum fluid density and gas-filled inner casing (see attached nomograph for ppg equivalent mud weights vs. injection pressure profiles). Breakdown pressure of the Ugnu is 13.5 ppg equivalent mud weight. DO NOT EXCEED 35,000 BBLS IN ANY GIVEN ANNULUS. ' "~'--' OEO 12 't995 f4asks 0ii & G,~s Corls. Commission Anchorage Ann. Inj. Nomograph PPG vs PSI S-24 Well Hydrostatic Pressure 13-3/8" Casing Burst 9-5/8" Casing Collapse Maximum Allowable Fluid Density at 2,668' TVD at 80% at 80% Injection Pressure (ppg) (psi) (psi) (psi) (psi) 8.00 1110 2,760 3,800 1,650 9.00 1249 2,760 3,800 1,511 10.00 1387 2,760 3,800 1,373 11.00 1526 2,760 3,800 1,234 12.00 1665 2,760 3,800 1,095 13.00 1804 2,760 3,800 956 14.00 1942 2,760 3,800 81 8 15.00 2081 2,760 3,800 679 16.00 2220 2,760 3,800 540 17.00 2359 2,760 3,800 401 S-33 Well Hydrostatic Pressure 10-3/4" Casing Burst 7-5/8" Casing Collapse Maximum Allowable Fluid Density at 2,958' TVD at 80% at 80% Injection Pressure (ppg) (psi) (psi) (psi) (psi) 8.00 1231 2,864 4,096 1,633 9.00 1384 2,864 4,096 1,480 10.00 1538 2,864 4,096 1,326 11.00 1692 2,864 4,096 1,172 12.00 1846 2,864 4,096 1,018 13.00 2000 2,864 4,096 864 14.00 2153 2,864 4,096 711 15.00 2307 2,864 4,096 557 16.00 2461 2,864 4,096 403 17.00 2615 2,864 4,096 249 Hydrostatic Pressure = TVD (casing shoe) * 0.052 * Fluid Density (ppg) Maximum Allowable Injection Pressure - Lesser of (Outer Csg Burst or Inner Csg Collapse) - Hydrostatic Pressure OEC 1 2 1995 Alaska 0ii & ~achorags _~perationai. Surer a ,.u.zon[al $idetr ac__ , . . . J . 8~ el 10. 12. P&A well. Test cement to 2,000 ps/. Tag cement minimum of 100' above top perforation @ 10,151' MD. Cut the 3-1/2" lubing @ _+6,400' MD. M/RU Nabors 28-E drilling fig. Pull 3-1/2" tubing. Test 9-5/8" casing to 3,500 psi for 10 minutes. RIH and set EZSV at ±6,250' MD (250' below proposed 9-5/8" section). PU section mill, T1H and spot 14.5 bbl (_+200') of 18.0 ppg milling fluid from EZSV (6,250' MD) to 5,995' MD. Space out and mill section from 5,995' MD to 6,045' MD. POOH. TIH with open-ended drilipipe. Mix and spot a 17.0 ppg cement kick-off plug (per recommended practices) from 6,145' to 5,795' MD. POOH a minimum of 12 stands, Perform a hesitation squeeze. Do not exceed a final squeeze pressure of 2,000 PS! and do not displace cement any closer than 100' above section top. . NOTE: Final cement volume should insure slurry placement 100' below milled section, 50' across milled section 'and 200' inside casing above milled section, PU directional BHA and TIH. Tag TOC. MINIMUM WOC TIME IS 12 HOURS. Dress off cement plug to 6,000' MD (5' below top of section), kick-off and directionaily drill pilot hole to +_10,115' MD (9,135' TVD). Final inclination is planned for 40.25° along an azimuth of 316°, POOH. RU and run_ open hole logs. RFT's may be run pending hole conditions, TIH with open-ended driilpipe and pump cement to p~ug back pilot hole to +_9,000' MD (+_300' MD above proposed kick-off point). NOTE: Final kick-off point and target depths may adjusted slightly pending evaluation of open hole log data. PU directional BHA arid TIH. Tag TOC, MINIMUM WOC TIME IS 12 HOURS. Dress off cement plug to +_9,200' MD, kick-off and directionally drill an 8-1/2" hole to +_10,336' MD (_+86°). POOH, RU and run 7" liner from 10,336' MD and tie back into 9-5/8" casing at +5,850' MD. POOH and LD liner running tools. S-01 B Sidetrack Operations Summary Page 2/3 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. PU directional BHA and drill 6" horizontal hole to 12,738' MD (at ___86°) along an azimuth of 290°. Maximum lateral interval is ___2,400'. POOH. NOTE: Inclination, azimuth and overall lateral length may be shortened by onsite geologist. A wiper trip may be made prior to running production liner. Run and set a 4-1/2", L-80 slotted liner @ Total Depth. Top of liner will be at +10,188' MD. Set 7"x 3-1/2" permanent production packer (with 3-1/2" tubing tail) at +9,870' MD (end of 65° tangent). A wireline plug shall be set in the tubing tail. Set oriented, retrievable whipstock above permanent packer to promote kick- off at 9,765' MD (8,765' TVD; 5' TVD below the top of the Sag River). Mill window off whipstock at _+9,765' MD and drill _+25' new hole. POOH. PU directional BHA, kick-off and directionally drill a 6" hole to _+10,398' MD (_+86°). POOH. PU directional BHA and drill a 6" horizontal hole to 12,714' MD along a planned azimuth of 290°. Maximum lateral interval is _+2,783'. POOH. NOTE: Inclination, azimuth and overall lateral length may be shortened by onsite geologist. A wiper trip may be made prior to running production liner. Run and set a 4-1/2", L-80 slotted liner @ Total Depth. _+9,775' MD (_+10' from window). RIH and pull retrievable whipstock. RU and run 4-1/2", L-80 production tubing. Set two way check and test to 1,000 psi. ND BOPE. NU tree and test to 5,000 psi. Freeze protect well and release rig. Top of liner will be at S-01B Sidetrack Operations Summary Page 3/3 Drilling Hazards Sadlerochit interval has a pore pressure of +8.0 ppg EMW. Lost circulation may occur due to overbalance conditions. Small faults are expected in the lower portion of the build interval with larger (50-100' throw) faults anticipated in the horizontal section for the Sadlerochit lateral. Similar faulting can be expected in the horizontal section of the Sag River lateral. There are no known drilling close approaches. No other known drilling hazards are expected. OEO Anchorage BPX-Shared Services Dr""'=L;,ng Alaska State Plane: Zon. PBU' WOA: S-Pad S-O1B S-O1B Wp8 Zone 4 NCW HALLIBURTON HOR[ZO~AL Vm.W (Tau~ NORTH) 3CALE ~00 ~t. / SURVEY REg:. II'EILHEAD SCAL~ 2OO ft.. / i~. TVD R~F: ~ VF, RTIU, M. S~CTION BEF; ~ ~m SCALS t0O a- / tm TVD REt:. WEL/.'{EAD VErTiCAL SECTZON REF: ~ S-01B SADLEROCHIT ZONE 4 LATERAL Alaska '"'.;, ....... Commi.~ior~ Anchorage WELL PLAN PROFILE SUMMARY START MDENDUDR_N4qED ACT]VHY 6000 6000 Vlndow section In well S-0IR. (PILot HoLe) 6000 6762 Klckout at 6'/100' with 81/2' assembly to azimuth oF 316' and to 0' IncUna%lon. (Pilot Hole) 6762 8797DriLL 8 1/2' hole verticaLLy, CPilot Hole) 8797 9609Begin kickoFF Fror~ pilot hole ut 8'/ID0'~o Inclination oF 65' and ~z{mu'~h oF 316% 9609 9872Maintain 65' tanoent through Sag River Into ShubUk, 9872 10336 Start oF curve ut 1P'/100' to IncLination oF 86' and azlnuth oF 290', Re.ch 7' casing point, 10336 11511 Irlli out with 6' assembly, Maintain tangent oF 86' IncLination at P.90' azimuth. ttStt t1578 Start oF curve at 6'/100' to 90' inctlno, tlon at azl~'~th oF P90', tlS/O l~.'/3O Ho, lntaln ~tangen~ ti) TD. TVD NS EV Grid X G~ld Y Sad BTur'g 8897 909 N 3350 V 613555 5980710 9001 1826 N 5122 V 613770 5981600 8897 1617 N 5181V 613714 5981390 8897 607 N 2391V 616319 5980420 Poty p~3 8897 1056 N 2508 V 616395 5980870 Poty pt4 8897 1899 N 5109 V 613782 5981673 Poiy 8897 1617 N 5181V 613714 5981390 Contr~ pti 8917 100S N E868 V 616036 5980814 APPROVED ,~, [To.r.9 WELL DESIGN Poly pip CASING POINT DATA DO MD Inc Azl TVD N/S E/V 7 In 1033685,98' 290.04'8917 1005N 2867 V 4 1/2 In12737 90,01' 290,02'90011026 N 512l V U~TICN.. PDINT DATA ~ Irc A~, 37t4 R~7I' TVD Ki~P~/ TIE IN / 6~ 4~,7~ ~ / ~T ~ ~5 4~46'B80.93'~371 EIE 18~ N ~ ~ ~ 676B 0,~' 316,0~ 6016 ~59 N EO~ V ~ 6440 ~9 N ~ V 7187 ~ 31~0~ T~ 97~ &~ 31~ 7979 T~ 8878 ~4~ T~ 9~ 37.6~ 3l&~ 8488 ~7 N ~69 T~ ~i ~,~' ~g ~v. 9744 ~.' 31~ 87~ .4 N ~437 v 98~ 6~' 3[~* 8795 705 N 24~ ST~T ~ ~7R~' 316.~' ~tO 7a8 a T~ ~%10t16 ~lt' 31~* /Z~ 4 / 4B · T~T ~ 1~ 7~lt'31~96' P~C It~~.~' ~' 89791308 370~ ST~T ~ 11511 ~*R~.~' 89991406 N ~9 V ~D ~ ~ 11578 ~01' ~ ~t 14~9 N 40~ V S~d ETe~g1R73~ 89.99' Rg~?.' 9001 1826 N 51~. v PLOT INFORMATION DRAWING NAME / FILE NAME 81BZ~ ~ ~01 bz4vho SURFACE LOOATION PROPOSED BI{L A~ ~ P{aM ] ~ ~MU~ 1~737.989000'00 ~cele~leI (~) ~ ~ y:se~ N/.S 5437.4~ 182~.91 N 61aL69 Pla~ FrTE I~.: 70~ 1% Edme~d g/l~ v.~, .~ ~' ~ -j - / STATE OF ALASKA AL, . _,CA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon X Suspend __ Operation Shutdown __ Re-enter suspended well _ Alter casing __ Repair well Plugging __ Time extension __ Stimulate __ Change approved program __ Pull tubing_ Vadance __ Perforate __ Other X __ Plugback for Sidetrack 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1629' SNL, 756' EWL, SEC. 35, T12N, R12E At top of prod'~ctive interval 916' SNL, 2221' EWL, SEC. 34, T12N, R12E At effective depth 858' SNL, 2106' EWL, SEC. 34, T12N, R12E At total depth 84 I' SNL, 2077' EWL, SEC. 34, T12N, R12E 5. Type of Well: Development x Exploratory ~ Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) Plan'RTE = 70.9 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-01R 9. Permit number 82-61/9-060 10. APl number 50- 029-20717-01 11. Field/Pool Prudboe Bay Field~Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10825. feet Plugs (measured) 9492 - feet BKB Effective depth: measured 10679 feet Junk (measured) true vertical 9351 feet BKB . Casing Length Size Cemented Structural -- Conductor 110' 20x30 ~: ..... "~\ 8c.y. S u trace 2665' 13-3/8" 3 720 c.f. Intermediate 10069' 9-5/8" ~ 1688 c.f. Production -- ! oC.f. Liner 1219' 7" Perforation depth: measured 10151' - 10194' (Sag R) 10210'- 1O235' (Shublik) 10283' - 10328' (Ivishak) true vertical subsea 8772'- 8944' (three intervals) Tubing (size, grade, and measured depth) 3-1/2" L-80 to 9545' with 2.~7/8" tailpipe to 9655' fill at 10679' MD' ¢3/89) Measured 'depth : 139' 2694' 10098' 9606'- 10825' True vertical depth BKB 139' 2694' 8787' Packers and SSSV (type and measured depth) 9-5/8" Baker packer at 9545'; 3-1/2" SSSVat 1931' 8316'-9492' RECEIVEIJ OEC - 7 13. Attachments Description summary of proposal __ Detailed operations program BOP sketch 14. Estimated date for commencing operation December30, 1995 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Suspended __ Service 17. ! hereby ce/~that the foreg~i~l ~s ~l:)pe/~nd correct to the best of my knowledge. / / Signed /{~/'~¢,,'//t_ /4,.,~.~~ ' Title Senior Drilling Engineer ' '>"-" (-,.-/ FOR COMMISSION USE ONLY Date ,/Z. - ..~- ¢ ¢ Conditions of approval: Notify Commission so representative may witness Plug integrity r.,,/ BOP Test /..,,/ Location clearance__ Mechanical Integrity Test __ Subsequent form required 10- /-f 0'1 Original Signed By Approved by order of the Commission David W. Johnston . IAppr°val N°' Approved Copy Re, turped~_. - ~/?~-~-~u[ Date /.2'-~/.~- ~'-~'' Form 10-403 Rev 06/15/88 i~ :-i:; .... - - ,. - . . ' · ', ,~.- SUBMIT IN TRIpUCATE · ~ '-~.:: .: :~ ~ : :~:. ,- ,. }i :'~,-- :~ ~ ~':; '!_i~-.:~.~'L~;...~. c~,~;~_:~;_ ~,:'~_.~::; :::.;: ~-:~. :~ ~:~ L'~>'::.F-:?~?:'~:~ ~:: ::..-- :.,:~h.~ ? >::~ . . .':~.,-:.,'~:'~/.~¢.~;~:?~.. ,..::, ~.:..c - 'v :.;: 2:~':~;~.~:.~, ~;.-~-~::,.,..¥ ~/'?-,:'¢ """ ~'-?? - O ,~-~ ~ ~ ............ ~lI ' ..................... ~ . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file-. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ~ape Subfile 2 is~ typ~: Lz~ TAPE HEADER PRUDHOE BAY I/NIT MWn/MAn mOSS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: S-01B 500292071202 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 14-DEC-96 MWD RUN 4 AK-MW- 60002 J. PANTER K. WHITE MWD RUN 5 J. PANTER C. DIXON 35 12N 12E 1629 756 70.26 68.76 35.46 OEC 1 9 1996 Oil & OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8 . 500 7 . 000 10149 . 0 MWD - GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. WELL S-01B IS REPRESENTED BY RUNS 1-5. RUNS 1-3 ARE DIRECTIONAL ONLY AND NO DATA IS PRESENTED. RUNS 4 AND 5 ARE DIRECTIONAL WITH GAMMA RAY (SGRD). GAMMA RAY DATA ACQUIRED WITH NATURAL GAMMA PROBE, SCINTILLATION TYPE DETECTOR, AND IS DENOTED AS NGP/SGRD. WELL S-01B IS DEPTH SHIFTED. ~ WELL S-01B WAS DRILLED TO TD AT 10149'. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 8430.0 $ BASELINE CURVE FOR SHIFTS: GR (WALS, CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR 8497.5 8503.5 8502.0 8508.0 8537.5 8544.5 8581.5 8589.0 8751.5 . 8757.5 9018.0 9026.5 9063 . 0 9074 . 0 9100.5 9110.0 9444.5 9455.5 9493.5 9505.0 9626.5 9640.0 9636.0 9649.0 9680.0 9692.5 9694.0 9706.5 9753.0 9765.5 9769.5 9781.0 9801.5 9815.0 9806.5 9819.0 9849.5 9861.5 9972 · 0 9984 . 0 9983 . 0 9994 . 5 9991.0 10003.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: MERGED MAIN PASS. all bit runs merged. STOP DEPTH 10067.0 Open Hole, 12-Jan-96.) EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 4 8505.0 9704.0 5 9704.0 10149.0 / ? ? SHI FT. OUT $ CN : BP EXPLORATION WN : S-01B FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA (ALASKA) * FORMAT RECORD (TYPE# 64) ~NE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 41 Tape File Start Depth = 10100.000000 Tape File End Depth = 8400.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10204 datums Tape Subfile: 2 146 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER F I LE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8436.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9635.0 il-JAN-96 MSC DGWD VERSION 1.32 DEP VERSION 2.041 / 2.042 MEMORY 9704.0 8505.0 9704.0 0 .7 43.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP 66 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 8.500 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.00 51.0 9.2 8OO 3.8 .000 .000 .000 .000 .0 158.5 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 4. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S-01B : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 31 Tape File Start Depth = 9720.000000 Tape File End Depth = 8420.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7804 datums Tape Subfile: 3 94 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NIIMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9636.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10079.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 12 -JAN- 96 MSC DGWD VERSION 1.32 DEP VERSION 2.041 / 2.042 MEMORY 10149.0 9704.0 10149.0 0 41.0 41.5 TOOL NUMBER NGP 235 8.500 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.20 49.0 9.4 700 3.4 .000 .000 .000 .000 .0 162.8 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 5. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S-01B : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 12 Tape File Start Depth = 10100.000000 Tape File End Depth = 9620.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 13088 datums Tape Subfile: 4 75 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 5 is type: LIS 96/12/13 01 **** REEL TRAILER **** 96/12/13 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 13 DEC 96 1:42p Elapsed execution time = 0.83 seconds. SYSTEM RETURN CODE = 0 S - 0lB PRUDHOE BAY /// / JAN' 2 6. ~9.~:' Ancflch'age Run 1' 12 - January - 1996 DIFL/DAC/ZDL/GR 5995 10085 WESTERN ATLAS Logging Services Tape Subfile 2 is type: L±S TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING RUN 1 6560.00 J. DAHL COPEN/DIXON REMARKS: S-01B 500292071702 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 18-JAN-96 OPEN HOLE RUN 2 RUN 3 35 12N 12E 1629 756 70.26 68.76 35.46 CAS lNG DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 5995.0 8.500 101~9.0 DIFL/DAC/ZDL/GR. CIRCULATION STOPPED AT 0400, 12-JAN-96. BARITE PRESENT IN MUD SYSTEM (3.5%) CAN EFFECT PE RESPONSE. PER CLIENT'S REQUEST, BOREHOLE & TORNADO CHART CORREC- TIONS WERE APPLIED TO THE DIL DATA. THE DIL DATA WAS CALIPER CORRECTED. THE CORRECTED DATA WAS THEN USED IN THE ATLAS TORNADO CHART TO GET "RT" & "DI" CURVES. RT = TRUE FORMATION RESISTIVITY. DI = DEPTH OF INVASION. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS Ail tool strings; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR DAS DIL SDN $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) depth shifted and clipped curves; .5000 START DEPTH STOP DEPTH 5995.0 10010.0 9500.0 10037.0 5995.0 10085.0 9500.0 10026.0 BASELINE DEPTH LL8 6008.0 6160.0 6160.5 6201.5 6201.5 6229.5 6230.0 6232.5 6232.5 6301.0 6300.5 6476.0 6567.5 6568.0 6627.5 6627.5 6724.5 6725.0 6797.5 6797.5 6889.5 6889.5 6925.5 6925.5 6945.0 6945.0 6953.5 6953.5 6987.0 6987.0 7010.0 7010.5 7026.5 7158.0 7158.0 7184.0 7184.5 7189.5 7189.5 7214.5 7214.0 7226.0 7313.5 7324.0 7370.0 7370.5 7385.5 7416.0 7421.5 7421.5 7435.5 7457 . 0 7457 . 0 7476.5 7476.5 7487 . 0 7487 . 0 7489.0 7488.5 7502.0 7502.5 7515.5 7515.5 7534.5 7534.5 7543.0 7542.5 7547.5 7547.5 7556.0 7555.5 all runs merged; EQUIVALENT UNSHIFTED DEPTH ILD 6007 6160 6201 6230 6232 6300 6475 6568 6627 6725 6797 6889 6925 6945 6953 6987 7010 7026 7158 .5 .5 .5 .0 5 5 5 0 5 0 .5 .5 .5 .0 .5 .0 .5 .5 .0 DT RHOB 7189.5 7214.0 7225.5 7313.0 7324.0 7370.5 7385.5 7415.5 7421.5 7435.5 7457.0 7476.5 7487.0 7488.5 7502.5 7515.5 7534.5 7542.5 7547.5 7555.5 no case 7571.0 7616.0 7768.0 7951.0 8050.0 8104.5 8157.0 8246.0 8284.0 8295.5 8309.0 8320.5 8327.0 8337.5 8354.5 8391.5 8407.5 8497.5 8502.0 8537.5 8619.0 8652.0 8729.0 8752.0 8933 .5 8960.5 8992.5 9003 . 0 9018.0 9046.0 9054.5 9063 .0 9100.5 9101.0 9119.5 9129.0 9139.5 9220.0 9444.5 9463.5 9464.0 9508.5 9518.5 9569.5 9624.5 9630.0 9630.5 9678.5 9681.5 9684.0 9686.5 9689.0 9694.0 9703.0 9705.0 9705.5 9714.0 9716.0 9716.5 9722.5 757-.0 7616.0 7768.0 7951.0 8050.0 8104.5 8156.5 8246.0 8284.0 8295.5 8309.0 8320.5 8326.5 8338.0 8354.5 8391.0 8407.0 8497.0 8502.0 8537.5 8618.5 8651.5 8729.0 8752.0 8933.5 8960.5 8993.0 9003.0 9018.0 9046.0 9055.0 9064.0 9101.5 9119.5 9129.5 9140.0 9219.5 9444.0 9464 . 0 9630.5 9683.5 9703.0 9704.5 9713.5 9716.0 7571 0 7616 0 7767 5 7951 0 8050 0 8104 5 8156.5 8246.0 8284.0 8295.5 8309.0 8320.5 8326.5 8338.0 8354 . 5 8391.0 8407.0 8497.0 8502.0 8537.5 8618.5 8651.5 8729.0 8752.0 8933.5 8960.5 8993.0 9003.0 9018.0 9046.0 9055.0 9063.5 9100.5 9119.5 9129.5 9140.0 9219.5 9444.0 9464.0 9507.5 9516.5 9569.5 9630.5 9677.5 9683.5 9704.5 9713.5 9716.0 9629.0 9688.5 9694.0 9705.0 9716.5 9624.5 9630.0 9677.5 9681.0 9686.5 9694.5 9706.0 9716.0 9722.0 9724.5 9726.5 9730.0 9735.5 9740.0 9745.0 9748 . 0 9748.5 9753.0 9755.5 9759.5 9762.0 9762 .5 9766.5 9777.0 9787.0 9787.5 9793 .0 9798.5 9806.5 9807.0 9816.5 9820.0 9821.5 9831.5 9847.5 9849.5 9864.0 9866.0 9873 .5 9879.5 9892.0 9895.0 9897.0 9897.5 9903 .5 9904.0 9906.0 9914.0 9919.0 9927.5 9932 .5 9933 .0 9937.5 9940.5 9949.5 9966.5 9972.0 9972.5 9983 .0 9991.0 9991.5 10004.0 10004.5 10010.0 10023 .5 10029.5 $ MERGED DATA SOURCE 9735.5 9740.5 9747.5 9753.5 9806.5 9819.0 9821.5 9831.0 9849.5 9864.0 9906.0 9933.5 10004.5 9730.0 9735.0 9740.5 9747.5 9753.5 9762.0 9787.0 9806.5 9815.5 9819.0 9821.5 9831.0 9848.5 9873.5 9906.0 9933.5 10004.5 10029.5 9724.5 9740.0 9747.5 9753.5 9755.5 9759.0 9761.5 9788.0 9799.0 9807.0 9821.5 9897.5 9904.5 9926.5 9932.0 9972.5 9983.0 9992.5 10004.5 10009.5 10022.5 10029.5 9726.5 9735.5 9745.0 9748.5 9763.0 9767.0 9777.5 9793.5 9799.0 9807.0 9820.0 9848.0 9866.0 9879.0 9892.0 9895.0 9897.5 9904.0 9906.5 9913.5 9918.5 9927.0 9933.5 9937.0 9940 . 0 9949 . 0 9967.0 9973.0 9983.0 9991.0 10004.0 PBU TOOL CODE GR DAS DIL SDN $ REMARKS: RUN ~0. PASS NO. MERGE 'tOP 1 5 5995.0 1 5 9500.0 1 5 5995.0 1 5 9500.0 OPEN HOLE MAIN PASS. MTEM, SP, TEND, & TENS WERE SHIFTED WITH LL8. ILM, RT, & DI WERE SHIFTED WITH ILD. DRHO, PEF, & CALl WERE SHIFTED WITH RHOB. MERGE BASE 10010.0 10037.0 10085.0 10026.0 CN WN FN COUN STAT / ? ?MATCH1. OUT / ? ?MATCH2 . OUT / ? ?MATCH3 . OUT / ? ?MATCH4. OUT $ : BP EXPLORATION (ALASKA) : S - 0lB : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR DAS 68 1 GAPI 4 2 DT DAS 68 1 US/F 4 3 TEND DAS 68 1 LB 4 4 TENS DAS 68 1 LB 4 5 LL8 DIL 68 1 OHMM 4 6 ILM DIL 68 1 OHMM 4 7 ILD DIL 68 1 OHMM 4 8 RT DIL 68 1 OHMM 4 9 DI DIL 68 1 IN 4 10 MTEM DIL 68 1 DEGF 4 11 SP DIL 68 1 MI/ 4 12 RHOB SDN 68 1 G/C3 4 13 DRHO SDN 68 1 G/C3 4 14 PEF SDN 68 1 BN/E 4 15 CALl SDN 68 1 IN 4 4 59 310 01 1 4 59 530 16 1 4 59 995 99 1 4 59 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 08 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 4 49 995 99 1 6O * DATA RECORD (TYPE~ 0) 966 BYTES * Total Data Records: 599 Tape File Start Dept~l = 10105.000000 Tape File End Depth = 5613.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 143761 datums Tape Subfile: 2 852 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 3 is type: LIS RUN NUMBER: TOOL STRING NUMBER: PASS NIIMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. 1 1 5 .2500 VENDOR TOOL CODE START DEPTH GR 5950.0 DAC 9500.0 DIFL 5950.0 ZDL 9500.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TTRM WTS SENSOR SUB COMR COMMON REMOTE GR GAMMA RAY ZDL Z-DENSILOG/CALIPER KNJT KNUCKLE JOINT KNJT KNUCKLE JOINT DAC DIGITAL ACOUSTILOG SLAM WTS SLAM ADAPTER DIFL DUAL INDUCTION $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) STOP DEPTH 10029.0 10073.0 10102.0 10051.0 12-JAN-96 ECLIPS 2.1 4OO 1745 10149.0 10110.0 5995.0 10108.0 1500.0 12-JAN-96 12-JA_N-96 TOOL NUMBER 3981XA 3510XA 1329XA 2228XA 3923XA 3923XA 1667EA/1680MA 3516XA 1503XA 8.500 5995.0 5995.0 LSND 10.20 49.0 9.4 3.4 190.0 MUD AT MEASURED iEMPERATURE (MT) : MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S - 0lB : PRUDHOE BAY : NORTH SLOPE : ALASKA 1 910 713 1 840 000 2 020 000 2.65 .000 1.5 71.0 190.0 72.0 .0 71.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 26 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Name Tool Code Samples Units GR DAC 68 1 GAPI DT24 DAC 68 1 US/F SFA1 DAC 68 1 US SFA2 DAC 68 1 US SFA3 DAC 68 1 US SFA4 DAC 68 1 US CHT DAC 68 1 LB TTEN DAC 68 1 LB SPD DAC 68 1 F/MN RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHMM RILD DIFL 68 1 OHMM RT DIFL 68 1 OHMM DI DIFL 68 1 IN CFOC DIFL 68 1 MMHO CILM DIFL 68 1 MMHO CILD DIFL 68 1 MMHO WTBH DIFL 68 1 DEGF SP DIFL 68 1 MV ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN HRD1 ZDL 68 1 CPS AP1 AP1 AP1 API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 56 310 01 1 4 56 520 99 1 4 56 995 99 1 4 56 995 99 1 4 56 995 99 1 4 56 995 99 1 4 56 635 99 1 4 56 635 99 1 4 56 636 99 1 4 07 220 06 1 4 07 120 44 1 4 07 120 46 1 4 07 120 46 1 4 07 120 44 1 4 07 210 06 1 4 07 110 44 1 4 07 110 46 1 4 07 995 99 1 4 07 010 01 1 4 46 350 01 1 4 46 356 99 1 4 46 358 01 1 4 46 280 99 1 4 46 354 02 1 25 HRD2 ZDL 68 1 CPS 4 26 SFT2 ZDL 68 1 CPS 4 * DATA RECORD (TYPE# 0) Total Data Records: 1997 978 BYTES * · 4 46 354 01 4 46 354 99 104 Tape File Start Depth = 10105.000000 Tape File End Depth = 5613.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 485164 datums Tape Subfile: 3 2077 records... Minimum record length: Maximum record length: 62 bytes 978 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 4 .2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9750.0 10071.0 DAC 9750.0 10116.0 DIFL 9774.0 10125.0 ZDL 9750.0 10093.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TTRM COMR GR ZDL KNJT KNJT DAC SLAM DIFL $ WTS SENSOR SUB COMMON REMOTE GAMMA R_AY Z-DENSILOG/CALIPER KNUCKLE JOINT KNUCKLE JOINT DIGITAL ACOUSTILOG WTS SLAM ADAPTER DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : 12-JAN-96 ECLIPS 2.1 400 12-JAN-96 1015 12-JAN-96 10149.0 10110.0 5995.0 10108.0 1500.0 TOOL NUMBER 3981XA 3510XA 1329XA 2228XA 3923XA 3923XA 1667EA/1680MA 3516XA 1503XA 8.500 5995.0 5995.0 LSND 10.20 49.0 9.4 3.4 190.0 1.910 .713 71.0 190.0 MUD FILTRATE ~T ~.lf: MUD FILTRATE ~T BHT: MUD C~KE ~T MT: MUD C~KE ~T BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S - 0lB : PRUDHOE BAY : NORTH SLOPE : ALASKA 1.~0 72.0 .000 .0 2.020 71.0 .000 .0 2.65 .000 1.5 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 26 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Name Tool Code Samples Units GR DAC 68 1 GAPI DT24 DAC 68 1 US/F SFA1 DAC 68 1 US SFA2 DAC 68 1 US SFA3 DAC 68 1 US SFA4 DAC 68 1 US CHT DAC 68 1 LB TTEN DAC 68 1 LB SPD DAC 68 1 F/MN RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHMM RILD DIFL 68 1 OHMM RT DIFL 68 1 OHMM DI DIFL 68 1 IN CFOC DIFL 68 1 MMHO CILM DIFL 68 1 MMHO CILD DIFL 68 1 MMHO WTBH DIFL 68 1 DEGF SP DIFL 68 1 MV ZDEN ZDL 68 1 G/C3 ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN HRD1 ZDL 68 1 CPS HRD2 ZDL 68 1 CPS SFT2 ZDL 68 1 CPS AP1 AP1 AP1 AP1 Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 56 310 01 1 4 56 520 99 1 4 56 995 99 1 4 56 995 99 1 4 56 995 99 1 4 56 995 99 1 4 56 635 99 1 4 56 635 99 1 4 56 636 99 1 4 07 220 06 1 4 07 120 44 1 4 07 120 46 1 4 07 120 46 1 4 07 120 44 1 4 07 210 06 1 4 07 110 44 1 4 07 110 46 1 4 07 995 99 1 4 07 010 01 1 4 46 350 01 1 4 46 356 99 1 4 46 358 01 1 4 46 280 99 1 4 46 354 02 1 4 46 354 01 1 4 46 354 99 1 * DATA RECORD (TYPE# 0) Total Data Records: 305 978 BYTES * 104 Tape File Start Depth = 10147.000000 Tape File End Depth = 9462.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 217769 datums Tape Subfile: 4 383 records... Minimum record length: 62 bytes Maximum record length: 978 bytes Tape Subfile 5 is type: LIS 96/ z/z8 01 **** REEL TRAILER **** 96/ ~/~9 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 19 JAN 96 10:36a Elapsed execution time = 9.89 seconds. SYSTEM RETURN CODE = 0