Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout196-126mLUGGT2,-,= = LO~% TION CL~2~_~_~CE REPORT
Sta~a cf Alaska
ALAS~ 0iL & GA~ CTNSE~rATION COMMISSION
.u_:~C _- ~
No.
Name
Lcc~_=icn
.~ev'law ,-e ...... , ~',d' cc=men: on pluqcjing, well head
sua"-us, = !oca=i=n c!ea~ce - uruv~e, loc. nc!ear, code,.
~~ b~~fl~,' · ,,
Loca:icn Cle~c~ ~) -
Conclusions:
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
JANUARY 03 2001
PL
M ATE
E
W
IA L U N D ER
T H
IS
M ARK ER
f_ .._. STATE OF ALASKA
ALASK .)ILAND GAS CONSERVATION CON. .SSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request:
[] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2558' SNL, 173' EWL, SEC. 32, T11N, R15E, UM
At top of productive interval
3230' SNL, 2395' WEL, SEC. 31, T11N, R15E, UM
At effective depth
170' SNL, 3047' WEL, SEC. 06, T10N, R15E, UM
At total depth
170' SNL, 3047' WEL, SEC. 06, T10N, R15E, UM
5. Type of well: [] Development
[] Exploratory
[] Stratigraphic
[] Service
6. Datum Elevation (DF or KB)
KBE = 72.13'
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
05-25A
9. Permit Number
196-126
10. APl Number
50- 029-21988-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
12.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Liner
11916 feet
9055 feet
11916 feet
9055 feet
Length
110'
3457'
9187'
398'
3098'
Size
20"
10-3/4"
7-5/8"
5-1/2"
3-1/2"
Perforation depth: measured Slotted Liner: 10396' - 11914'
true vertical Slotted Liner: 9045' - 9055'
Plugs (measured)
Junk (measured)
ORIGINAL
Cemented MD
2150# Poleset 110'
1000 sx CS III, 350 sx 'G', 157 sx CS 3490'
410 sx Class 'G' 9220'
155 sx Class 'G'
135 sx Class 'G'& Uncemented
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 8820'
8874'-9272'
8818'-11916'
TVD
110'
3489'
8483'
8188'8527'
8140'-9055'
Packers and SSSV (type and measumd depth) 4-1/2" Camco Bal-O SSSV Nipple at2189'; 7-5/8"x 4-1/2"Baker'S'packerat3893'andl
8765'
13. Attachments
[] Description Summary of Proposal
14. Estimated date for commencing operation
September 23, 2000
16. If proposal was verbally approved
Name of approver
Date Approved
Contact Engineer Name/Number: Thomas McCarty, 564-5697
[] Detailed Operations Program [] BOP Sketch
Status of well classifications as:
[]Oil [] Gas [] Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
17. I hereby cert~foregoing is true and correct to the best of my knowledge
Signed "~' ,/-'¢¢--( ~'~"'~-/'-~'~" Title CT Drilling Engineer
Thomas McCarty
Date
Conditions of Approval: Notify Commission so representative may witness I Approval
Plug integrity ~ BOP Test ~ Location clearance
Mechanical Integrity Test Subsequent form required 10-., ,U~,~N.
Approved by order of the Commission ORIGINAL - ¢. - v
F~ T,-..,--. c;,~,-~,~ ~nt : g,c.,t tC~J') ~Commissioner Date
Form 10-403 Rev. 06/15/88 .... '~ ................. ~ ',-'l~],~.~ Submit In Triplicate
bp
September 18,2000
To:
Attention:
Subject:
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Blair Wondzell
Sr. Petroleum Engineer
5-25b CTD Sidetrack Prep
BP Exploration Alaska Inc.
Drilling & Wells
Coiled Tubing Drilling Team
Well 5-25a is scheduled for a through tubing sidetrack to be drilled with coiled
tubing. The following summarizes the procedure required to prep 5-25a for
drilling and is submitted as an attachment to Form 10-403. A schematic diagram
of this proposed completion is attached.
1. A MITIA was successful on 9/06/00.
2. An anchor and whipstock will be set at approx. 10,000'md (8973'tvdss),
88deg inclination, with service coil.
3. Using service coil the existing slotted liner will be abandoned by squeezing
approximately 46bbls of cement below the whipstock.
4. The window will be milled off of the whipstock with service coil out of the
3Y2"liner with the KOP at approximately 10,000'md (8973'tvdss)
5. A sidetrack of approx. 1674 ft into Zone la will be drilled with CT.
6. The sidetrack will be completed with a cemented 2 3/8" liner that will be
brought up into the existing 3 ½" liner and cemented in place. The cement
top will be approximately 9600'md (8,752'tvdss).
Service coil is expected to perform steps 4, 5 and 6 beginning on September 23,
2000. Drilling coil is expected to begin the sidetrack drilling on September 28,
2O0O.
Thomas McCarty
CT Drilling Engineer
Tel: 564-5697
Fax: 564-5193
Cell: 240-8065
rnccarttrn@bp.corn
www. bp. corn
CC:
Well File
Petrotechnical Data Center
Terrie Hubble
DS 05-25E . ROPOSED CT HORIZONTAL SIDETRACK
10-3/4" @ 3490'
SSSV @ 2198'
GLM's @ 3583' & 3826'
7-5/8" x 4-1/2" Baker S Packer @ 3893'
4-1/2", 12.6#, L-80 Production Tubing to 8820'
XN @ 8798'
7-5/8" x 4-1/2" Baker S Packer @ 8765'
7-5/8" x 3-1/2" Hanger Packer @ 8818'
3-1/2" Liner Top @ 8818'
5-1/2 .... LinerTop @ 8874'
7-5/8" @ 9220'
Whipstock @
10000'
3-1/2" EC
@ 10396'
~ 5-1/2" Window @ 9272' (previous Sidetrack)
Top of 2-3/8" Liner @ 9600'
jMill New Window through 3-1/2" Liner @ 10000'
3" Open Hole
Pump
whipstock to
Abandon 3-1/2"
Slotted Liner
3-1/2" 9.3# L-80 Liner @ 11916'
2-3/8" FL4S 4.6# Liner Cemented & Perforated
TD @
11674'
pcr 9/21/2000
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status ol well Classification of Service Well
Oil [~ Gas E~] Suspended D Abandoned r~ Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska), Inc. ~f~,~tc~,_ _ 196-126
3. Address i'~t}~ i 8. APl Number
P. O. Box 196612 Anchorage, AK99519-6612 5. 50-029-21988-01
4. Location of well at surface 9. Unit or Lease Name
2556' FNL, 5106' FEL, Sec. 32, T11N, R15E, UM (asp's 697246, 5948889) Prudhoe Bay Unit
At Top Producing interval 10. Well Number
3230' FNL, 2395' FEL, Sec. 31, T11 N, R15E, UM (asp's 694698, 5948149) 05-25A
At Total Depth 11. Field and Pool
168' FNL, 3045' FEL, Sec. 6, T10N, R15E, UM (asp's 694113, 5945915) Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
RKB 72.13 feetI ADL 28329 Prudhoe Bay Oil Pool
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. J15. Water Depth, if offshore 16. No. of Completions
August 7, 1996 August 20, 1996 October 3, 2000 (P&A'd)I N/A feet MSL 1
17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost
11916' MD/9056' TVD 9964' MD/9042' TVD YES [~] No F~I 2189' feet MD 1900' (approx)
122. Type Electric or Other Logs Run
MWD, GR, CNL, Acoustic, LWD: DIR/FE
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BO-I-rOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED
20" 101# H-40 Surface 110 30" 2150# Poleset
10-3/4" 45.5# J-55 Surface 3490' 13-1/2" 1000 Sx CS Ill, 350 Sx Class G, & 157 Sx CS
7-5/8" 29.7# L-80 Surface 9220 9-7/8" 41o Sx Class G
5-1/2" 17# L-80 8874' 9272' 6-3/4" 155 Sx Class G
3-1/2" 9.3# L-80 8818' 10396' 4-3/4" 135 Sx Class G
3-1/2" 9.3# L-80 10396' 11916' 4-3/4" Uncemented Slotted Liner
24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" 8820' 3893'
8765'
* Plugged & Abandoned all open perforation intervals. 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
(See P&A Summary)
.27. PRODUCTION TEST i 1i '} i ¢' '~ ! ?~. t /~' L
Date First Production Method of Operation (Flowing, gas lift, etc.)
N/A Plugged & Abandoned
Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OJI,.RATIO
N/A Test Pedod >
Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (con-)
Press. 24-Hour Rate >
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips.
Alaska Oil & Gas Cons
* This 10-407 is submitted as directed per the 10-403 form approved September 20, 2000 (Approval #300-244)
Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate
29. 30.
NAME
Top of Sag River Sand
Top of Shublik
Top of Sadlerochit
Top of Zone 2A
Top of Zone lB
GEOLOGIC MARK~- r~S
MEAS. DEPTH
9126'
9170'
9256'
TRUE VERT. DEPTH
8405'
8442'
8514'
8933'
9721'
9838'
9000'
FORMATION TESTS
Include interval tested, pressure data, all fluids recovered and gravity.
GOR, and time of each phase.
N/A
31. LIST OF A-I-I-ACHMENTS
Summary of 05-25A Pre Coil Tubing Sidetrack Plug & Abandonment Operations.
32. I hereby cedify that the following is true and correct to the best of my knowledge.
.
Signed /~ ~an.~f~/~~ Title C oilTubin,q D rillin.qEn,qineer
Lamar .
Date
INSTRUCTIONS
Prepared by Paul Rauf 564-5799.
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other
spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in
item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each
additional interval to be separately produced, showing the data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other-explain. RE CE ~ Vj~ D
Item 28: If no cores taken, indicate "none".
Form 10-407
Alaska Oil & Gas Cons. Commissi~
05-25A
DESCRIPTION OF WORK COMPLETED
PRE COILED TUBING SIDETRACK PLUG & ABANDOMENT SUMMARY
Date Event Summary
9/06/2000:
9/27/2000:
9/30/2000:
10/01/2000:
10/02/2000:
10/03/2000:
10/04/2000:
10/05/2000:
10/06/2000:
10/07/2000:
10/09/2000:
10/10/2000:
10/11/2000:
10/1 2/2000:
PPPOT-T to 5000 psi - passed. MITOA to 2000 psi - passed.
MIT-T to 3000 psi - passed. CMIT TXIA to 2800 psi - passed.
MIRU CTU#5. PT'd equip. RIH w/Mem GR/CCL tools & logged to 10100' MD. POOH.
RIH & set Whipstock Anchor @ 10006' MD. POOH. RIH & made several attempts to set
Whipstock Tray. Last-attempt yielded a lodged tool string - unable to get free.
Dislodged tool string & POOH - full recovery. RIH & attempted to set Whipstock Tray in
Anchor. Unable to latch - POOH w/Tray.
RIH & set Whipstock Tray @ (top) 9995'. POOH & RD CTU#5.A CTU Cement Plug was
pumped to Plug & Abandon the lower wellbore prior to ST operations as follows: MIRU
CTU#3. PT'd equip. Killed well. RIH w/CT & tagged Whipstock anchor. Pumped 50 bbls of
15.8 ppg Class G Cement around-the Whipstock Anchor to abandon the open 3-1/2" slotted
liner interval located @:
10396' - 11914' MD (Zone 1B / 2A)
Placed 22 bbls of Cement behind pipe @ a max squeeze press of 500 psi. Contaminated
cement w/Biozan & jetted contaminated Cement f/the wellbore to the 9707' MD. POOH w/
CT. FP'd well. RD CTU#3. WOC.
MIRU CTU#5. PT'd BOPE.
RIH w/bi-centered bit. Milled cement stringers & cement to 9990' MD. POOH. RIH w/
window milling BHA & milled to the Whipstock @ 10002' MD. Commenced window milling
operations through the 3-1/2" casing.
Milled to 10005'. POOH - output shaft on motor broke, leaving bit box & mill in hole as fish.
RIH w/fishing BHA & made 2 unsuccessful attempts to recover fish. POOH.
Left grapple in hole as additional fish. FP'd well. RD CTU#5.
MIRU CTU#5. PT'd BOPE. RIH & tagged top of fish @ 9995'. PUH & set TIW Whipstock
Anchor @ 9967' ELM. Confirmed Anchor set & POOH. RIH & attempted to gather Whipstock
orientation data -instrumentation problems. POOH.
Still unable to gather Anchor orientation data - debris on BTM. RIH w/CT & performed FCO
to Whipstock Anchor. POOH w/CT.
RIH & tagged BTM @ 9977' CTM. Recorded Whipstock Anchor orientation data. POOH.
RIH & set TIW Whipstock Tray. POOH. RIH & tagged top of Whipstock @ 9964' CTM.
Continued w/05-25B Sidetracking Operations.
PERMIT
DATA
AOGCC Individual Well
Geological Materials Inventory
T DATA PLUS
Page: 1
Date: 07/21/98
RUN RECVD
96-126 7436
96-126 CN/GR
96-126 BHC/GR
96-126 SSVD
96-126 DIR SRVY
96-126 NGP-TVD
96-126 NGP-MD
96-126 7961
~74-10039 1
'%'o8o- oo o
~9080-10040 1
~9080-10040 1
LR/~PERRY 9261-11916
8535-9055
~//9259-11916
c3~2,5-7,9-12 SPERRY GR
08/30/96
09/06/96
09/06/96
09/06/96
09/13/96
FINAL 02/19/97
FINAL 02/19/97
04/16/97
10-407 ~R~COMPLETION DATE ¢/~ ~/~ 9/
DAILY WELL OPS ~ 7/301 ~/ TO ~/~/~ /
Are dry ditch samples required? yes ~ And received?
Was the well cored? yes .~___Analysis & description..~e_~c~i-ved?-
Are well tests required? yes~_Rece¢~ ived? ye~--~o-----~-
Well is in compliance
Initial
COMMENTS
r"! IR I I_1_ I PO C~ S t= IR L/I !-- I=: S
WELL LOG TRANSMITFAL
To: State of Alaska April 16, 1997
Alaska Oil and Gas Conservation Conun.
Attn.: Loft Taylor
3 001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - D.S. 05-25A,
AK-MW-60098
The technical data listed below is being submitted hereWith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of 2
Jim Galvin, Sperry-Sun Drilling Se~ices, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-029-21988-01.
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252
A Dresser Industries, Inc. Company
0 I::! I I_1-- I I~1G S E~l:l~dl C E S
WELl, LOG TRANSMITTAL
To: State of Alaska February 19, 1997
Alaska Oil and Gas Conservation Comm.
Attn.: Lori Taylor
3001 Porcupine Dr. q (0
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs DS 05-25A, AK-MW-60098
The technical data listed below is being submitted herewith. Please address any problems or concerns
to the attention of.'
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
DS 05-25A:
2"x 5"MD Gamma Ray Logs:
50-029-21988-01
2" x 5" TVD Gamma Ray Logs:
50-029-21988-01
1 Blueline
1 Folded Sepia
Blueline
Folded Sepia
. ..
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
ARCO Alaska Inc. 96-126
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21988-01
4. Location of well at surface ~- ~--,-,~.-', ..... : ~,? t.,~ ~, ~"-~'¢i 9. Unit or Lease Name
2558' SNL, 173' EWL, SEC. 32, T11N, R15E ~~~~.~-~ ~ / ? ,.¢~,~y~-?.:,,~:~ ,,_ ~! Prudhoe Bay Unit
At top of productiv.,e interval~ .e°'./~-_.~'___/~ ~.,~;.~..d~._~_, 10. Well Number
3232' SNL, 2406 WEL, SEC. 31, T11N, R15E ; V~i~!;~ ? 05-25A,
At total depth ~-. -~-.~:~ ..... i :2~.~--'-~;~ 11. Field and Pool
169' SNL, 3037' WEL, SEC. 06, T10N, R15E
Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
KBE - 72.13I ADL 028329
12. Date Spudded08/07/96 J13' Date T'D' Roached 114' Date C°mp" Susp" °r Aband'115' Water depth' if °fish°re 16' N°' °f C°mpleti°ns08/20/96 08/27/96 N/A MSL One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)I19. Directional Surveyl20. Depth where SSSV set~l. Thickness of Permafrost
11916 9055 FTI 11916 9055 FTI NYes UNo I 2189' MD| 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, CNL, Acoustic, LWD: DIP/FL,
23. CASING, LINER AND CEMENTING RECORD
CASING SE'I-FING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP Bo'FrOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 101 H-40 Surface 110' 30" 2150# Poleset
10-3/4" 45.5# J-55 Surface 3490' 13-1/2" 11000 sx CS III, 350 sx 'G', 157 sx CS II
7-5/8" 29.7# L-80 Surface 9220' 9-7/8" 410 sx Class 'G'
5-1/2" 17# L-80 8874' 9272' 6-3/4" 155 sx Class 'G'
3-1/2" 9.3# L-80 8818' 10396' 4-3/4" 1135 sx Class 'G'
3-1/2" 9.3# L-80 10396' 11916' 4-3/4" Uncemented Slotted Liner
24. Perforations open to Production (MD+TVD of Top and Bottom i25. TUBING RECORD
and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
3-1/2" Slotted Liner 4-1/2", 12.6#, L-80 8820' 3897', 8765'
M D TVD M D TVD
10396' - 11914' 9045' - 9055' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freezel~r~.e~7,t, ~tl~ ~5/I~l~of Diesel
OCT 0 4 199G
i27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.) Alaska 0il & Gas Cons. CommissioH
September 3, 1996 I Flowing Anchorage
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing PressureCALCULATED ~ OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR)
Press. 24-Hour RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name Depth Depth and gravity, GOR, and time of each phase.
Sag River 9151' 8424' -- Doug Knock gave these to me on 9/12 via the phone.
Shublik 9195' 8461'
Top of Sadlerochit 9279' 8533'
.......
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that~e f~regoin/~ is true and cerrect to the best of my knowledge --
Signed,[. ,X' .,~/ ~-~
Dan Stoltz //t~.-zn... _~2- , Title Senior Drilling Engineer Date C/ 0/~
Prepared By Name/Number: Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM §: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
~,,.9~o;'.
Form 10-407 Rev. 07-01-80
SUMMARY OF DAILY OPERATIONS
SHARED SERVICES DRILLING - BPX / ARCO
Well Name: 05-25A Rig Name: Doyon 9 AFE: 4J0326
Accept Date: 07/29/96 Spud Date: 08/07/96 Release Date: 08/27/96
Jul 30 1996 (1)
Rig moved 100 %. Held safety meeting. Worked on BOP - Lubricator. Circulated at
8357 ft. Worked on BOP - Lubricator. Worked on BOP - Surface tree. Worked on BOP
- BOP stack. Held safety meeting. Worked on BOP - All functions.
Jul 31 1996 (2)
Tested BOP stack. Retrieved BOP test plug assembly. Retrieved Casing hanger %s
seal assembly running tool. Held safety meeting. Circulated at 8400 ft. Laid down 65
ft of Tubing. Rigged up sub-surface equipment - Other sub-surface equipment.
Retrieved Seal assembly. Tested BOP stack. Rigged down Well control. Rigged
down Well control. Laid down 7000 ft of Tubing.
Aug I 1996(3 )
Laid down 5000 ft of Tubing. Held safety meeting. Laid down 9550 ft of Tubing.
Tested Bottom ram. Rigged up Kelly. Singled in drill pipe to 75 ft. Singled in drill pipe
to 4000 ft. Held safety meeting. Singled in drill pipe to 8550 ft. Rigged up Kelly.
Washed to 8630 ft. Milled Retrievable packer at 8630 ft.
Aug 2 1996 (4)
Milled Permanent packer at 8633 ft. Circulated closed in well at 8633 ft. Circulated at
8633 ft. Flow check. Pulled out of hole to 450 ft. Pulled BHA. Made up BHA no. 2.
R.I.H. to 8633 ft. Fished at 8633 ft. Circulated closed in well at 9550 ft. Flow check.
Pulled out of hole to 9090 ft. Flow check. Pulled out of hole to 482 ft. Pulled BHA.
Laid down fish.
Aug 3 1996 (5)
Laid down fish. Conduct braided cable operations - 5/16 size cable. Rigged up
Logging/braided cable equipment. Conduct braided cable operations - 5/16 size
cable. Test Logging/braided cable equipment unit. Conduct braided cable
operations - 5/16 size cable. Rigged down Logging/braided cable equipment. Tested
Casing. Held safety meeting. Rigged up Packer assembly. Held safety meeting.
Ran Drillpipe in stands to 8563 ft. Singled in drill pipe to 8871 ft. Tested Other sub-
surface equipment-Via string.
~ ~ '" ',. I. ,¥ ~ "' '
~.¥.¢.., .-
Operations Summary for: 05-25A
Aug 4 1996 (6)
Pulled out of hole to 0 ft. Rigged up sub-surface equipment - Other sub-surface
equipment. Serviced Block line. Held safety meeting. Ran Drillpipe in stands to 2000
ft. Tested Other sub-surface equipment- Via string. Ran Drillpipe in stands to 8871 ft.
Tested Casing - Via annulus and string. Laid down 60 ft of Drillpipe. Tested Casing -
Via annulus. Circulated at 8813 ft. Tested Casing - Via annulus. Held safety meeting.
Aug 5 1996 (7)
Tested Casing- Via annulus and string. Pulled Drillpipe in stands to 0 ft. Ran
Drillpipe to 455 ft (2.875 in OD).
Ran Drillpipe in stands to 5000 ft. Held safety meeting. Ran Drillpipe in stands to
9286 ft. Injectivity test - 12 bbl injected at 3000 psi. Displaced slurry - 55 bbl.
Reverse circulated at 9286 ft. Circulated at 9286 ft. Pulled Drillpipe in stands to 455
ft. Held safety meeting. Laid down 455 ft of Drillpipe. Retrieved Bore protector.
Rigged up Top ram. Tested Well control.
Aug 6 1996 (8)
Installed Bore protector. Laid down 400 ft of Drill collar. Held safety meeting. Ran
Drill collar to 420 ft (3.125 in OD). Ran Drillpipe in stands to 1000 ft. Held safety
meeting. Ran Drillpipe in stands to 9286 ft. Set tool face. Milled Casing at 9288 ft.
Held safety meeting. Milled Casing at 9291 ft.
Aug 7 1996 (9)
Milled Casing at 9295 ft. Circulated at 9295 ft. Laid down 2600 ft of 3.5 in OD drill
pipe. Pulled out of hole to 2000 ft. Held safety meeting. Pulled out of hole to 400 ft.
Pulled BHA. Serviced BOP stack. Made up BHA no. 1 . Singled in drill pipe to 1000
ft. Circulated at 1000 ft. Pulled out of hole to 200 ft. Pulled BHA. Made up BHA no.
1 . Held safety meeting. Made up BHA no. 1 . Singled in drill pipe to 3100 ft. R.I.H.
to 6000 ft.
Aug 8 1996 (10)
R.I.H. to 9294 ft. Drilled to 9389 ft. Held safety meeting and drills. Drilled to 9514 ft.
Circulated at 9514 ft. Pulled out of hole to 5350 ft. Held safety meeting. Pulled out
of hole to 179 ft. Pulled BHA. Made up BHA no. 2. R.I.H. to 1000 ft.
Aug 9 1996 (11)
R.I.H. to 2000 ft. Functioned downhole tools at 2000 ft. Pulled out of hole to 179 ft.
Pulled BHA. Downloaded MWD tool. Made up BHA no. 2. R.I.H. to 3101 ft. Held
safety meeting. R.I.H. to 4100 ft. Pulled out of hole to 179 ft. Pulled BHA.
Downloaded MWD tool. Made up BHA no. 2. R.I.H. to 8563 ft. Held safety meeting.
R.I.H. to 9514 ft. Drilled to 9639 ft.
Page
Operations Summary for: 05-25~
Aug 10 1996 (12)
Drilled to 9766 ft. Held safety meeting. Drilled to 9891 ft. Circulated at 9891 ft.
Pulled out of hole to 3101 ft. Held safety meeting. Pulled out of hole to 179 ft. Pulled
BHA. Made up BHA no. 3. R.I.H. to 2501 ft.
Aug 11 1996 (13)
R.I.H. to 6920 ft. Serviced Block line. R.I.H. to 9505 ft. Held safety meeting. Held
drill (Fire). R.I.H. to 9767 ft. Reamed to 9891 ft. Drilled to 9955 ft. Pulled out of hole
to 1500 ft. Held safety meeting. Held drill (Kick while tripping). Pulled out of hole to
179 ft. Pulled BHA. Tested BOP stack.
Aug 12 1996 (14)
Tested BOP stack. Made up BHA no. 4 . Held safety meeting. R.I.H. to 9955 ft.
Drilled to 10035 ft. Circulated at 10035 ft. Pulled out of hole to 2730 ft. Held safety
meeting. Held drill (H2S). Pulled out of hole to 179 ft. Pulled BHA. Ran electric logs.
Aug 13 1996 (15)
Ran electric logs. Ran Tubing to 1131 ft (2.875 in OD). Ran Drillpipe in stands to
8291 ft. Held safety meeting. Ran Drillpipe in standsto 8721 ft. Ran electric logs.
Pulled Drillpipe in stands to 0 ft. Made up BHA no. 5. Held safety meeting. Made
up BHA no. 5. R.I.H. to 362 ft. Made up BHA no. 6. R.I.H. to 8400 ft.
Aug 14 1996 (16)
R.I.H. to 9673 ft. Pulled out of hole to 6500 ft. Held safety meeting. Pulled out of hole
to 21 ft. Pulled BHA. Ran electric logs. Ran Drillpipe in stands to 8720 ft. Ran
electric logs. Held safety meeting. Ran electric logs.
Aug 15 1996 (17)
Ran electric logs. Pulled Drillpipe in stands to 67 ft. Held safety meeting. Rigged
down sub-surface equipment - Formation logs. Made up BHA no. 6. R.I.H. to 8256 ft.
Serviced Block line. R.I.H. to 10035 ft. Held safety meeting. Held drill (Fire).
Drilled to 10164 ft.
Aug 16 1996 (18)
Drilled to 10342 ft. Held safety meeting. Drilled to 10538 ft. Circulated at 10538 ft.
Pulled out of hole to 10036 ft. Logged hole with LWD: DIR/FE from 10036 ft to 9929 ft.
Pulled out of hole to 6000 ft. Pulled out of hole to 179 ft. Pulled BHA. Downloaded
MWD tool. Made up BHA no. 7.
Page 3
Operations Summary for: 05-25,-,
Aug 17 1996 (19)
R.I.H. to 10009 ft. Held safety meeting. R.I.H. to 10538 ft. Drilled to 10800 ft. Held
safety meeting. Drilled to 10858 ft. Circulated at 10858 ft. Pulled out of hole to 7751 ft.
Aug 18 1996 (20)
Pulled out of hole to 180 ft. Pulled BHA. Made up BHA no. 8 . Held safety meeting.
R.I.H. to 10858 ft. Drilled to 10919 ft. Held safety meeting. Held drill (Kick while
drilling). Drilled to 11042 ft.
Aug 19 1996 (21)
Drilled to 11261 ft. Held safety meeting. Held drill (Kick while drilling). Drilled to
11511 ft. Circulated at 11511 ft. Pulled out of hole to 5172 ft. Held safety meeting.
Pulled out of hole to 180 ft. Pulled BHA. Made up BHA no. 9. Tested BOP stack.
Aug 20 1996 (22)
Tested BOP stack. Made up BHA no. 9. R.I.H. to 3103 ft. Held safety meeting. Held
drill (Kick while tripping). R.I.H. to 11511 ft. Drilled to 11668 ft. Held safety meeting.
Held drill (H2S). Drilled to 11798 ft.
Aug 21 1996 (23)
Drilled to 11916 ft. Circulated at 11916 ft. Held safety meeting. Pulled out of hole to
9274 ft. R.I.H. to 11916 ft. Circulated at 11916 ft. Pulled out of hole to 8771 ft. Laid
down 2919 ft of 2.875 in OD drill pipe. Pulled BHA. Ran Casing to 1516 ft (3.5 in
OD).
Aug 22 1996 (24)
Ran Casing to 3100 ft (3.5 in OD). Circulated at 3100 ft. Ran Drillpipe in stands to
6000 ft. Held safety meeting. Ran Drillpipe in stands to 11043 ft. Worked toolstring
at 11400 ft. Pulled Drillpipe in stands to 8871 ft. Circulated at 8871 ft. Pulled
Drillpipe in stands to 3100 ft. Held safety meeting. Pulled Casing in stands to 3100
ft. Made up BHA no. 11.
Aug 23 1996 (25)
Made up BHA no. 11 . R.I.H. to 8800 ft. Held safety meeting. Serviced Block line.
Laid down 2500 ft of 3.5 in OD drill pipe. Reamed to 9577 ft. Held safety meeting.
Reamed to 9828 ft.
Aug 24 1996 (26)
Reamed to 11544 ft.
Page 4
Operations Summary for: 05-2b,-,
Aug 25 1996 (27)
Reamed to 11916 ft. Circulated at 11916 ft. Pulled out of hole to 9320 ft. R.I.H. to
11916 ft. Circulated at 11916 ft. Held safety meeting. Pulled out of hole to 3200 ft.
Held safety meeting. Laid down 2900 ft of 2.875 in OD drill pipe. Pulled BHA. Ran
Casing in stands to 1500 ft.
Aug 26 1996 (28)
Ran Casing in stands to 3100 ft. Circulated at 3100 ft. Ran Drillpipe in stands to
8870 ft. Circulated at 8870 ft. Held safety meeting. Ran Drillpipe in stands to 7651 ft.
Circulated at 7651 ft. Ran Drillpipe in stands to 11916 ft. Set Inflatable packer at
10352 ft with 1400 psi. Displaced slurry - 71 bbl. Reverse circulated at 8820 ft.
Circulated at 8820 ft. Laid down 7000 ft of Drillpipe. Held safety meeting. Rigged
down Kelly. Laid down 8800 ft of Drillpipe. Rigged down sub-surface equipment -
Setting tools. Tested Casing - Via annulus.
Aug 27 1996 (29)
Removed Bore protector. Ran Tubing to 2500 ft (4.5 in OD). Held safety meeting.
Ran Tubing to 8820 ft (4.5 in OD). Installed Tubing hanger. Reverse circulated at
8815 ft. Held safety meeting. Reverse circulated at 8815 ft. Ran Tubing on landing
string to 8820 ft. Set packer at 8764 ft with 4000 psi. Installed Hanger plug.
Aug 28 1996 (30)
Rigged down BOP stack. Installed Xmas tree. Removed Hanger plug. Tested
Hydraulic packer. Held safety meeting. Freeze protect well - 85 bbl of Diesel.
Installed Hanger plug.
Page 5
PAGE 1
ERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
SHARED SERVICES DRILLING
PBU/DS 5-25A
500292198801
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/12/96
DATE OF SURVEY: 082096
MWD SURVEY
JOB NUMBER: AK-MW-60098
KELLY BUSHING ELEV. = 72.13
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9261.58 8518.16 8446.03
9280.00 8533.68 8461.55
9338.15 8583.52 8511.39
9368.16 8610.39 8538.26
9399.21 8639.58 8567.45
32 40 S 80.80 W .00
32 30 S 80.71 W .96
29 38 S 69.18 W 11.34
23 11 S 66.07 W 21.98
16 28 S 71.76 W 22.46
672.59S 2569.31W 2408.02
674.18S 2579.10W 2416.58
681.83S 2608.00W 2443.71
686.87S 2620.35W 2456.44
690.73S 2630.13W 2466.44
9431.02 8670.27 8598.14
9458.27 8696.74 8624.61
9496.69 8733.93 8661.80
9528.41 8764.53 8692.40
9559.87 8794.85 8722.72
14 10 S 53.90 W 16.42
13 24 S 42.74 W 10.15
15 45 S 28.97 W 10.85
14 46 S 29.95 W 3.16
16 20 S 14.06 W 14.37
694.44S 2637.57W 2474.53
698.73S 2642.41W 2481.00
706.56S 2647.96W 2490.27
713.84S 2652.07W 2498.07
721.61S 2655.15W 2505.40
9591.14 8824.42 8752.29
9621.73 8852.23 8780.10
9653.32 8879.57 8807.44
9684.43 8904.88 8832.75
9716.22 8928.98 8856.85
'9748.42 8951.23 8879.10
9780.94 8970.89 8898.76
9810.90 8986.69 8914.56
9844.32 9002.74 8930.61
9871.29 9014.35 8942.22
21 33 S 11.92 W 16.84
27 32 S 8.73 W 20.02
32 30 S 9.63 W 15.80
38 31 S 10.43 W 19.38
42 54 S 12.39 W 14.38
49 36 S 10.07 W 21.45
55 57 S 8.45 W 19.89
60 23 S 10.48 W 15.90
62 12 S 14.95 W 12.93
66 49 S 19.76 W 23.50
731.51S 2657.41W 2513.45
744.01S 2659.64W 2523.15
759.61S 2662.17W 2535.04
777.39S 2665.33W 2548.81
797.71S 2669.44W 2564.94
820.52S 2673.94W 2582.95
846.06S 2678.09W 2602.44
871.16S 2682.29W 2621.68
899.74S 2688.75W 2644.88
922.96S 2696.02W 2665.29
9893.33 9022.67 8950.54
9915.50 9030.09 8957.96
9937.83 9036.31 8964.18
9957.24 9040.62 8968.49
9968.29 9042.55 8970.42
68 48 S 22.24 W 13.73
72 5 S 24.02 W 16.70
75 32 S 23.40 W 15.63
78 48 S 23.14 W 16.90
81 1 S 22.85 W 20.26
942.01S 2703.34W 2683.07
961.21S 2711.55W 2701.64
980.85S 2720.17W 2720.80
998.23S 2727.65W 2737.65
1008.24S 2731.89W 2747.30
9984.47 9044.47 8972.34
10005.90 9045.32 8973.19
10037.66 9045.54 8973.41
10052.97 9046.00 8973.87
10069.43 9046.90 8974.77
85 21 S 22.71 W 26.78
90 3 S 22.16 W 22.08
89 10 S 21.77 W 3.06
87 20 S 21.94 W 11.94
86 22 S 22.61 W 7.21
1023.05S 2738.11W 2761.54
1042.84S 2746.28W 2780.45
1072.29S 2758.16W 2808.38
1086.49S 2763.86W 2821.82
1101.70S 2770.09W 2836.32
10085.07 9047.92 8975.79
10099.49 9048.76 8976.63
10115.91 9049.29 8977.16
10129.51 9049.43 8977.30
10161.03 9049.46 8977.33
86 10 S 21.85 W 5.01
87 11 S 21.53 W 7.48
89 4 S 20.90 W 12.07
89 45 S 21.48 W 6.52
90 7 S 19.91 W 5.12
1116.15S 2775.99W 2850.08
1129.53S 2781.31W 2862.71
1144.82S 2787.25W 2877.04
1157.50S 2792.16W 2888.91
1186.98S 2803.30W 2916.29
ERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU/DS 5-25A
500292198801
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/12/96
DATE OF SURVEY: 082096
MWD SURVEY
JOB NUMBER: AK-MW-60098
KELLY BUSHING ELEV. = 72.13
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DGMN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
10177.81 9049.28 8977.15 91 10
10192.89 9048.84 8976.71 92 5
10210.52 9048.16 8976.03 92 22
10224.44 9047.62 8975.49 92 5
10237.74 9047.07 8974.94 92 34
S 19.36 W 7.06 1202.79S 2808.94W
S 19.72 W 6.61 1216.99S 2813.98W
S 18.94 W 4.68 1233.61S 2819.81W
S 18.73 W 2.51 1246.78S 2824.30W
S 18.56 W 3.90 1259.37S 2828.55W
2930.71
2943.65
2958.74
2970.60
2981.90
10256.04 9046.40 8974.27 91 39
10273.16 9046.00 8973.87 90 59
10287.35 9045.73 8973.60 91 13
10299.29 9045.43 8973.30 91 39
10317.49 9044.81 8972.68 92 12
S 17.68 W 6.95 1276.75S 2834.24W
S 17.15 W 4.99 1293.08S 2839.36W
S 17.26 W 1.86 1306.63S 2843.56W
S 17.75 W 5.46 1318.02S 2847.15W
S 17.14 W 4.51 1335.37S 2852.60W
2997.36
3011.72
3023.60
3033.62
3048.89
10349.04 9043.98 8971.85 90 48
10380.89 9044.17 8972.04 88 31
10395.63 9044.55 8972.42 88 31
10412.77 9045.02 8972.89 88 22
10443.26 9045.71 8973.58 89 1
S 15.25 W 7.47 1365.65S 2861.40W
S 15.40 W 7.17 1396.36S 2869.81W
S 15.70 W 2.04 1410.56S 2873.76W
S 13.97 W 10.13 1427.12S 2878.15W
S 14.41 W 2.57 1456.67S 2885.62W
3074.97
3101.04
3113.13
3127.07
3151.67
10472.96 9045.66 8973.53 91 11
10491.40 9045.21 8973.08 91 32
10506.53 9044.77 8972.64 91 49
10535.96 9043.80 8971.67 91 58
10551.27 9043.21 8971.08 92 27
S 14.02 W 7.46 1485.45S 2892.91W
S 13.91 W 1.94 1503.34S 2897.36W
S 14.23 W 2.81 1518.01S 2901.04W
S 12.92 W 4.48 1546.60S 2907.94W
S 13.53 W 5.11 1561.50S 2911.44W
3175.65
3190.48
3202.67
3226.22
3238.41
10567.53 9042.47 8970.34
10599.05 9041.14 8969.01
10615.73 9040.76 8968.63
10628.24 9040.68 8968.55
10659.83 9040.58 8968.45
92
92
90
90
90
44
5
29
15
7
S 13.70 W 2.01 1577.28S 2915.26W
S 13.93 W 2.19 1607.86S 2922.78W
S 15.00 W 11.54 1624.01S 2926.95W
S 15.22 W 2.60 1636.09S 2930.21W
S 14.62 W 1.94 1666.61S 2938.34W
3251.42
3276.72
3290.22
3300.43
3326.16
10674.81 9040.62 8968.49 89 35
10689.53 9040.77 8968.64 89 13
10706.91 9040.82 8968.69 90 25
10720.04 9040.64 8968.51 91 8
10752.27 9040.13 8968.00 90 40
S 13.92 W 5.82 1681.13S 2942.04W
S 15.68 W 12.22 1695.36S 2945.80W
S 15.17 W 7.50 1712.11S 2950.42W
S 15.41 W 5.71 1724.77S 2953.88W
S 16.42 W 3.44 1755.76S 2962.72W
3338.27
3350.24
3364.48
3375.22
3401.79
10782.55 9040.22 8968.09 88 58
10811.88 9040.90 8968.77 88 20
10844.89 9042.17 8970.04 87 16
10861.04 9043.02 8970.89 86 43
10873.84 9043.74 8971.61 86 49
S 16.25 W 5.64 1784.82S 2971.23W
S 16.50 W 2.34 1812.95S 2979.50W
S 15.62 W 4.20 1844.64S 2988.62W
S 15.41 W 3.64 1860.19S 2992.94W
S 14.76 W 5.14 1872.52S 2996.26W
3426.88
3451.18
3478.42
3491.66
3502.09
PAGE 3
~'-'~ERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
SHARED SERVICES DRILLING
PBU/DS 5-25A
500292198801
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/12/96
DATE OF SURVEY: 082096
MWD SURVEY
JOB NI3MBER: AK-MW-60098
KELLY BUSHING ELEV. = 72.13 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DGMN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
10891.41 9044.98 8972.85
10904.51 9046.18 8974.05
10922.57 9047.77 8975.64
10936.09 9048.71 8976.58
10953.78 9049.50 8977.38
85 2
84 25
85 31
86 26
88 25
S 14.28 W 10.55 1889.49S 3000.66W 3516.29
S 15.63 W 11.30 1902.09S 3004.02W 3526.92
S 13.80 W 11.82 1919.49S 3008.59W 3541.53
S 12.57 W 11.30 1932.62S 3011.67W 3552.27
S 15.54 W 20.16 1949.76S 3015.96W 3566.51
10967.30 9049.80 8977.67 89 4
10996.50 9050.09 8977.96 89 46
11015.53 9050.19 8978.06 89 35
11027.34 9050.27 8978.14 89 41
11058.65 9050.31 8978.18 90 9
S 15.33 W 5.12 1962.79S 3019.55W
S 14.11 W 4.82 1991.02S 3026.97W
~S 14.62 W 2.84 2009.46S 3031.69W
S 13.13 W 12.64 2020.92S 3034.53W
S 14.21 W 3.75 2051.35S 3041.93W
3577.59
3601.31
3616.70
3626.20
3651.30
11075.10 9050.14 8978.01 91 0
11090.32 9050.03 8977.90 89 50
11105.83 9050.10 8977.97 89 35
11122.87 9050.24 8978.11 89 28
11154.28 9050.47 8978.34 89 39
11174.73 9050.69 8978.56 89 8
11186.09 9050.86 8978.73 89 8
11203.24 9051.09 8978.96 89 17
11217.43 9051.28 8979.15 89 13
11234.71 9051.46 8979.33 89 35
S 13.02 W 8.93 2067.338 3045.80W
S 13.57 W 8.44 2082.14S 3049.30W
S 12.14 W 9.36 2097.26S 3052.75W
S 12.56 W 2.56 2113.91S 3056.39W
S 10.15 W 7.69 2144.69S 3062.57W
S 13.48 W 16.48 2164.71S 3066.76W
S 11.50 W 17.43 2175.79S 3069.22W
S 11.36 W 1.19 2192.60S 3072.62W
S 11.73 W 2.64 2206.50S 3075.46W
S 11.46 W 2.65 2223.43S 3078.93W
3664.47
3676.61
3688.91
3702.33
3726.73
3742.72
3751.68
3765.01
3776.07
3789.54
11247.87 9051.33 8979.20
11279.70 9050.29 8978.17
11310.36 9048.91 8976.78
11342.17 9047.24 8975.11
11355.70 9046.55 8974.42
91 28
92 15
92 55
93 5
92 49
S 10.24 W 17.03 2236.35S 3081.40W
S 11.09 W 3.60 2267.61S 3087.29W
S 11.92 W 3.48 2297.63S 3093.40W
S 9.22 W 8.49 2328.85S 3099.23W
S 9.84 W 4.96 2342.18S 3101.46W
3799.68
3824.15
3848.00
3872.40
3882.62
11372.79 9045.93 8973.80 91 17
11403.27 9045.50 8973.37 90 20
11435.13 9045.40 8973.27 90 0
11466.98 9045.58 8973.45 89 22
11495.62 9046.21 8974.08 88 5
S 9.23 W 9.69 2359.02S 3104.29W
S 11.33 W 7.56 2389.00S 3109.73W
S 9.31 W 6.43 2420.34S 3115.44W
S 9.41 W 1.97 2451.76S 3120.62W
S 9.74 W 4.65 2480.008 3125.38W
3895.54
3918.84
3943.23
3967.25
3988.93
11527.32 9047.33 8975.20
11543.49 9048.00 8975.87
11559.08 9048.72 8976.59
11590.57 9050.19 8978.06
11606.90 9050.89 8978.76
87 50
87 26
87 13
87 26
87 37
S 10.46 W 2.40 2511.18S 3130.94W
S 10.95 W 3.91 2527.06S 3133.94W
S 12.24 W 8.38 2542.31S 3137.07W
S 12.11 W .78 2573.06S 3143.70W
S 12.35 W 1.87 2589.01S 3147.16W
4013.09
4025.53
4037.67
4062.39
4075.22
~ERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
SHARED SERVICES DRILLING
PBU/DS 5-25A
500292198801
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/12/96
DATE OF SURVEY: 082096
MWD SURVEY
JOB NUMBER: AK-MW-60098
KELLY BUSHING ELEV. = 72.13
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS
INCLN DIRECTION
DG MN DEGREES DG/100
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
VERT.
SECT.
11621.57 9051.48 8979.35 87 43 S 11.13 W 8.33 2603.36S 3150.14W
11651.04 9052.55 8980.42 88 7 S 12.43 W 4.61 2632.19S 3156.15W
11682.37 9053.55 8981.42 88 14 S 13.54 W 3.56 2662.70S 3163.19W
11713.30 9054.34 8982.21 88 49 S 13.15 W 2.29 2692.78S 3170.32W
11745.16 9054.83 8982.70 89 25 S 12.90 W 2.01 2723.82S 3177.50W
4086.66
4109.68
4134.56
4159.24
4184.56
11777.15 9054.75 8982.62 90 51 S 12.90 W 4.50 2755.00S 3184.64W
11806.73 9054.56 8982.43 89 52 S 12.08 W 4.32 2783.88S 3191.04W
11838.45 9054.73 8982.60 89 28 S 11.07 W 3.42 2814.95S 3197.40W
11869.63 9054.96 8982.83 89 41 S 9.21 W 6.00 2845.64S 3202.89W
11916.00 9055.21 8983.08 89 41 S 9.21 W .00 2891.41S 3210.31W
4209.94
4233.29
4258.00
4281.80
4316.71
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4320.46 FEET
AT SOUTH 47 DEG. 59 MIN. WEST AT MD = 11916
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 230.38 DEG.
TIE-IN SURVEY AT 9,261.58' MD
WINDOW POINT AT 9,280.00' MD
PROJECTED SURVEY AT 11,917.00' MD
~-~ERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
SHARED SERVICES DRILLING
PBU/DS 5-25A
500292198801
NORTH SLOPE BOROUGH
COMPUTATION DATE: 9/12/96
DATE OF SURVEY: 082096
JOB NUMBER: AK-MW-60098
KELLY BUSHING ELEV. = 72.13 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9261.58 8518.16 8446.03
10261.58 9046.24 8974.11
11261.58 9050.98 8978.85
11916.00 9055.21 8983.08
672.59 S 2569.31 W 743.42
1282.03 S 2835.92 W 1215.34 471.92
2249.84 S 3083.84 W 2210.60 995.26
2891.41 S 3210.31 W 2860.79 650.19
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
~ERRY-SUN DRILLING SERVICES~
ANCHORAGE ALASKA
PAGE 6
SHARED SERVICES DRILLING
PBU/DS 5-25A
5oo2921988o1
NORTH SLOPE BOROUG~I
COMPUTATION DATE: 9/12/96
DATE OF SURVEY: 082096
JOB NUMBER: AK-MW-60098
KELLY BUSHING ELEV. = 72.13
OPERATOR: ARCO ALASKA INC
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD- TVD
DIFFERENCE
VERTICAL
CORRECTION
9261.58 8518.16 8446.03 672.59 S 2569.31 W 743.42
9324.99 8572.13 8500.00 679.69 S 2601.77 W 752.86
9432.93 8672.13 8600.00 694.78 S 2637.86 W 760.80
9536.28 8772.13 8700.00 715.68 S 2652.95 W 764.15
9.44
7.93
3.35
9644.60 8872.13 8800.00 755.13 S 2661.43 W 772.47
9783.22 8972.13 8900.00 847.96 S 2678.39 W 811.09
11916.00 9055.21 8983.08 2891.41 S 3210.31 W 2860.79
8.33
38.62
2049.70
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
0 !::t I I--I-- I I~J [:S S I:::: F! ~J I r- ~::: S
September 12, 1996
AOGCC
Howard Okland
3001 Porcupine Dr
Anchorage, AK 99501
Re: Distribution of Survey Data 5-25A
Dear Mr. Oakland,
Enclosed are two hard copies of the above mentioned file(s).
Well 5-25A
MWD survey, tie in point 9,261.58', window point 9,280.00', interpolated
depth 11,917.00'
Please call me at 563-3256 if you have any questions or concerns.
Regards,
William T. Allen
Operations Support Engineer
Attachments.
S EP 1 T~
Oil~,u~' n'~" Oons, Oom~i~io~
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252
A Dresser Industries, Inc. Company
HOWARD OKLAND
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHOR_AGE
AK, 99501.
Date:
RE:
4 September 1996
Transmittal of Data
ECC #: 6772.00
Sent by: HAND CARRY
Data: OH-LDWG
Dear Sir/Madam,
Reference:
5-25A
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
rECEIVED
SEP 0 G ]996
^Hcnorage
Prints/Films:
1 CN FINAL BL+RF Run # 1
1 BHC/AC FINAL BL+RF Run # 1
1 SSVD FINAL BL+RF Run # 1
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by: ~~~'~~ ~ Date:
HOWARD OKLAND
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Dear Sir/Madam,
Reference:
ARCO
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes: 1
LDWG TAPE+LIS
Date:
RE:
28 August 1996
Transmittal of Data
ECC #: 6772.00
Sent by: HAND CARRY
Data: OH-LDWG
Run # 1
Received by: ~
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Anchorage, AK 99518
to (907) 563-7803
Date:
STATE OF ALASKA
ALASKA OiL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
2. Name of Operator 15. Type of well: 6.
ARCO Alaska Inc. I [] Development
[] Exploratory 7.
3. Address [] Stratigraphic
P.O. Box 196612, Anchorage, Alaska 99519-6612 []Service
4. Location of well at surface 8.
Datum Elevation (DF or KB)
Plan RTE = 57.7
Unit or Property Name
Prudhoe Bay Unit
Well Number
11-09A
1155' NSL, 377' WEL, SEC. 28, T11N, R15E
At top of productive interval
2482' NSL, 4702' WEL, SEC. 22, T11N, R15E (Planned)
At effective depth
At total depth
3143' NSL, 3282' WEL, SEC. 22, T11N, R15E (Planned)
9. Permit Number
96-128
10. APl Number
50-029-21402-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
110'
2449'
6772'
feet
feet
feet
feet
Plugs (measured)
Junk (measured)
Size
20"
13-3/8"
9-5/8"
Cemented
2000 sx Poleset
2500 sx PF 'E', 500 sx PF 'C', 100 sx PF 'C'
600 SX Class 'G'
ORIGINAL
MD TVD
110' 110'
2507' 2507'
6830' 5030'
Perforation depth: measured
true vertical
Tubing (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
Alaska Oil & Gas Cons. C0,rrllTlJssJ0r)
Anch0rege
13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch
14. Estimated date for commencing operation
August 19, 1996
16. If proposal was verbally approved
Blair Wondzell ~
Name of approver
08/19/96
Date approved
15. Status of well classifications as:
[] Oil [] Gas [] Suspended
Service
Contact Engineer Name~mber:___ //Winton.Aubert, 564-4825 Prepared By Name/Number:
17.1 hereby certify that/4~e f/eZregoinCs/ue/~ correct to the best of my knowledge
Signed
DanStoltz r.~,//~/~~ Title Senior Drilling Engineer
Commission Use Only
Terrie Hubble, 564-4628
Conditions of Approval: Notify Commission so representative may witness I Approval No.
Plug integrity ,'"" BOP Test ~__._. Location clearance
Mechanical In~aritv TeStungit~ai Sign-e-d-By Subsequent form required 10- /~'0'7'
Tuckerman
Babcock. .
Approved by order of the Commission Approved Copy Commissioner Date
Form 10-403 Rev. 06/15/88
%Returned
Submit In Triplicate
DS 11-9A
Well Plan Revision Narrative
DS 11-9A is a potential horizontal sidetrack targeting Zone 1 reserves. The original ap-
proved well plan entailed abandoning Well DS 11-9, cutting and pulling production tubing
from + 10,000', then milling 9-5/8" casing at approx, this depth. Several removal at-
tempts resulted in recovery of tubing to + 7,100'. At this point operating economics dic-
tated ceasing fishing. This well plan revision involves setting a bridge plug ~ + 7,100'
MD, milling casing from + 6820' - + 6870', setting a kick-off plug, and sidetracking the
well to the original DS 11-9A targets.
MEMORANDUM
TO:
/
David Joh nst/~
Chairman
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: August 13, 1996
THRU' Blair Wondzell, ¢.¢..~ FILE NO:
P. I. Supervisor
FROM' Lou Grimaldi, ~..,.~ SUBJECT:
Petroleum Inspector
QEFJHMDD.DOC
Rig BOPE Inspection
Doyon Rig #9
Arco well #DS 5-25
Prudhoe Bay Field
PTD #96-126
Tuesday, August 13, 1996: I made a Rig/BOPE inspection on Doyon Rig #9 drilling Arco
well #DS5-25 in the Flow 1 area of the Prudhoe Bay Field.
I arrived to find the rig in the midst of a fishing operation and was tripping in the hole to
retrieve a lost bottom hole assembly. I made a tour of the rig and found all equipment to
be in apparent good shape. The rig was in very good shape and the housekeeping both
inside and outside showed that there is a high priority set in this area.
I spoke with Richard Bordes briefly about the recently renewed emphasis placed on
Surface Casing Cement jobs, and the procedures for dealing with improper returns.
SUMMARY: I made a Rig/BOPE inspection on Doyon Rig #9 drilling Arco well #DS5-25,
and found a good looking and well maintained rig.
Attachments: QEFJHMDD.XLS
cc; Tom Horten/Scott Sigurdsen (Shared Services drilling)
NON-CONFIDENTIAL
STATE OF ALASKA
ALAS. , OIL AND GAS CONSERVATION COl~.
RIG / BPS INSPECTION REPORT
.,~SION
OPERATION: Drilling X Workover Compl. UIC DATE: 8/14/96
Well Name: DS5-25 PTD# 96-126
Drig Contractor: Doyon Rig# 9 Rep. Tim Krupa
Operator: Arco Rep. Richard Bordes Rig Ph.# 659-4831
Location: Section 32 T. 11N R. 15E M. U
INSPECTION ITEMS IN COMPLIANCE INSPECTION ITEMS IN COMPLIANCE
(A.) B.O.P. STACK X NO N/A (C,) MUD SYSTEM YES NO N/A
1 Wellhead fig wkg press X 29 Pit level floats installed X
2 Stack wkg press X 30 Flow rate sensor X
3 Annular preventer X 31 Mud gas separator X
4 Pipe rams X 32 Degasser X
5 Blind rams X 33 Separator bypass ×
6 Stack anchored X 34 Gas sensors X
7 Chke/kill line size X 35 Choke line connections X
8 All turns targeted ( chke & kill Ln.) X 36 Trip tank X
9 HCR valves (chke & kill Ln.) X INSPECTION ITEMS IN COMPLIANCE
10 Manual valves (chke & kill Ln.) X (D.) RIG FLOOR YES NO N/A
11 Connections (FIgd, Whd, Clamped X 37 Kelly cocks (upper, lower, IBOP) X
12 Drilling spool X 38 Floor valves (dart, ball, ect.) X
13 Flow Nipple X 39 Kelly & floor valve wrenches X
14 Flow monitor X 40 Drillers console (flow monitor, X
15 Control lines fire protected X flow rate indicator, pit level X
INSPECTION ITEMS IN COMPLIANCE indicators, gauges) X
(B.) CLOSING UNIT YES NO N/A 41 Kill sheet up-to-date X
16 Working pressure X 42 Gas detection monitors X
17 Fluid level X (H2S & methane) X
18 Operating pressure X 43 Hydraulic choke panel ~ X
19 Pressure gauges X 44 Choke manifold X
20 Sufficient valves X INSPECTION ITEMS IN COMPLIANCE
21 Regulator bypass X (E.) MISC. EQUIPMENT YES NO N/A
22 4-way valves (actuators) X 45 ~Flare/vent line X
23 Blind rams handle cover X 46 All turns targeted X
24 Driller control panel X (downstream choke lines) X
25 Remote control panel X 47 Reserve pit tankage X
26 Firewall X 48 Personnel protective equip, avail. X
27 Nitrogen power source (backup) X 49 All Drillsite Supervisors Trained X
28 Condition (leaks, hoses, ect.) X For Procedures X
50 H2S probes X
51 Rig housekeeping X
REMARKS: Rig in good shape
RECORDS:
Date of Last Rig / BPS Inspection Date of Last BOP Test
Resulting Non-Compliance Items:
Non-Compliance not corrected & Reason:
Date Corrections Will Be Completed:
BOP Test & Results Properly Entered On Daily Record? Yes
8/9/96
None
Kill Sheet Current? Yes
Distribution:
orig - Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c - Inspector
AOGCC REP:
OPERATOR REP:
Louis R. Grimaldi
Richard Bordes
QEFJHMDD.XLS (Rev. 12/92)
ALASKA OIL AND GAS
CONSERVATION COMMISSION
TONY KNOWLE$, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
._
July 22, 1996
Terry Jordan
Senior Drilling Engineer
ARCO Alaska Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Pmdhoe Bay Unit 05-25A
BP Exploration (Alaska) Inc.
Permit No. 96-126
Sur. Loc. 2558'SNL, 173'EWL, Sec. 32, T1 IN, R15E, UM
Bmmhole Loc. 5264'SNL, 2603'WEL, Sec. 31, T1 IN, R15E, UM
Dear Mr. Jordan:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to wimess a test of BOPE installed prior to drilling new hole. Notice may be given by
ector on the North Slope pager at 659-3607.
·
David W.
Chairman
BY ORDER OF THE COMMISSION
dlf/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill 1 lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen, [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. Plan RTE = 69.3' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028326
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
2558' SNL, 173' EWL, SEC. 32, T11N, R15E Prudhoe Bay Unit
At top of productive interval 8. Well Number Number U-630610
3556' SNL, 2603' WEL, SEC. 31, T11N, R15E 05-25A
At total depth 9. Approximate spud date Amount $200,000.00
5264' SNL, 2603' WEL, SEC. 31, T11N, R15E 07/24/96
i12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028329, 16'I 05-04, 497' away at 10150' MD 2560 11743' MD / 8975' TVD
i16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e)(2)}
Kick Off Depth 9260' MD Maximum Hole Angle 89 ° Maximum surface 3520 psig, At total depth (TVD) 8800' / 4390 psig
i18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
4-3/4" 3-1/2" 9.2# L-80 STL 994' 9170' 8369' 10164' 8965' 171 sx Class 'G'
4-3/4" 3-1/2" 9.2# L-80 STL 1579' 10164' 8965' 11743' 8975' Uncemented Slotted Liner
, ,,
,,,
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs(measured) ORIGINAL
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor R[C[IVED
Surface ,
Intermediate
Production JUL 1 7 1996
Liner
Alaska 0il & Gas Cons. Commission
Anch0rege
Perforation depth: measured
true vertical
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth PIct [] RefraF~i,on Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
........ ¢' ~
~ontact £ngineor Narao/Numbor: Kolli Bardwoll, $~4-480~ I Prepared By Name~Number Terrio Hubble, $~4-4~£8
21. ' hereby certi~/~at the foregoing is true/ai~d correct to the best of my knowledgesignedTerry Jordan /'.//~"~/'~~/, l'~i'~'~~ Title Senior Drilling Engineer Date ~ z_~~_(_~.. _
Commission Use Only
Permit Number I APl Number Approval Date I See cover letter
~'~:~ - /.,2. ~I 50- ~ .2.? -- .2. / ? ~"~"" c:~ ! '"~- ~, ~ -~ JoI for other requirements
Yes No Mud Log Required [] Yes ,~ No
Conditions of Approval: Samples Required [] '~Y~e's
Hydrogen Sulfide Measures [] No Directional Survey Required ~ Yes [] No
Required Working Pressure for BOPE [] 2M; []3M; .~ 5M; [] 10M; [] 15M
Other: by order of
drlglnal $ignea ay Commissioner the commission Date
Approved By
.,.. ..... .,.: ~.~.~ !._ k __ ~... ~.
Form 10-401 Rev. 12-01-85
Duvid
Submit In Triplicate
I Well Name: 15-25A
Redrill Plan Summary
Type of Redrill (producer or injector): I Shut-in Producer
ISurface Location:
Target Location:
Bottom Hole Location:
2558' FNL, 173' FWL, S32, T1 IN, R15E, UM
3556' FNL, 2603' FEL, S31, TllN, R15E, UM
5264' FNL, 2603' FEL, S31, TllN, R15E, UM
]AFE Number: 14J0326 I
I Estimated Start Date: I July 24, 1996
Im~: I11743' I
[Rig: [ Doyon 9
I Operating days to complete: I 24
Ir VD: 1~7~ ~s I Ir~ Elv. 1~.3'
Well Design (conventional, slimhole, etc.):
[Sidetrack
I
I
I
I
I Objective: ] To recover Zone I reserves
Mud Program:
New Flo-Pro will be used in milling and in the horizontal section
Depth(TVD)lDensityCppg)[PVCcp.) YP Im~~I ~0n~n~I
Horiz. 9.0 10 40-45 23 29
FL cc/30min
+6cc
Casing/Tubing Program:
Hole Size Csg/Tbg O.D. Wt/Ft Grade Conn Length Top MDfrVDss Btm
MD/TVDss
4-3/4" 3.5" solid liner 9.2# L-80 STL 994' 9170'/8369' 10164'/8965'
4-3/4" 3.5" slotted liner9.2# L-80 STL 1579' 10164'/8965' 11743'/8975'
N/A 4.5" tbg 12.6# L-80 LTC-Mod 8870' Surface 9150'/8360'
Cement Calculations:
Liner Size: [ 3.5" production liner
Basis:] 40% open hole excess, 200' above the liner top
Total Cement Volume: sxs of Class G Blend @ 1.17 ft3/sx ( Estimated Volume )
Directional-.
[KOP: I 9260' MD
Maximum Hole Angle: [ 89 degrees @ TD
Close Approach Well: [ 5-04 is 497' away at 10150' MD
5-25A Redrill Plan Summary Page 1
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures. Diverter,
BOPE and mud fluid system schematics on file with AOGCC.
Drilling Hazards:
° Maximum anticipated BHP:
° Maximum surface pressure
o Planned Completion Fluid:
4390psi @ 8800' ss
3520 psi @ 8800' ss
8.6 ppg filtered sea water
a. The drilling fluid program and surface system will conform to the regulations set forth
in 20AAC25.003.
b. Maximum surface pressure is based on BHP and a full column of gas to TD (0.10
psi/ft).
c. The most recent H2S level on this well was measured at 14 ppm (7/24/95). This is
considered a low H2S well, but proper precautions will be taken as needed.
eo
Drilling Hazards:
· . This wellbore may cross a fault in the horizontal section at - 11360' MD. Lost
circulation may occur in this interval. Expected throw on this fault is 0-20'.
· A gas zone is present from the KOP to the CGOC at 9832' MD.
RECEIVED
JUL ] 7 199~,
Cons.
A,aSK~ 0il & Gas _0mmissi0n
Anchore. g~
5-25A Redrill Plan Summary Page 2
5-25A Operations Summary
Note: A sundry request was submitted for the decompletion and P&A operations for this well.
The following operations will occur immediately following the plug and abandonment by the
rig.
.
.
PU Baker Anchor/whipstock assembly. MWD/CCL will be used to align the whipstock for a
30° left of highside exit. The bottom trip anchor will be set by slacking off on the bridge plug..
Once sheared from the whipstock, displace well with sidetrack drilling fluid - refer to attached
mud program.
Begin cutting window using only enough WOB and RPM to cut as smoothly as possible especially
for the first 2-3' to insure good directional behavior and a good cut into the casing.
After cutting remaining casing, try to make at least 22' of formation, approximately 38' total of
milling and drilling from the top of the whipstock. This will allow the full-sized watermelon mill to
pass through the window all the way down to the bottom of the window effectively reaming the
sidetracked interval.
Work the milling assembly up and down through the window several times to insure all tight spots
and torque are minimized or eliminated. Ideally, assembly should be able to trip through window
interval with pumps off.
.
.
.
10.
11.
12.
Circulate and condition. Pump high vis pill to assist with removal of metal and cement
cuttings, POOH with mill BHA.
RIH with 4-3/4" steerable drilling assembly on 2-7/8" drillpipe. Drill 4-3/4" hole to 90° at 9965'
MD.
POOH and run DPC GR/Neuton/Density, and Sonic logs to end of build section
RIH with 4-3/4" steerable drilling assembly on 2-7/8" drillpipe. Drill 4-3/4" hole directionally to
TD at 11743' MD. See attached directional plan. Refer to Recommended Practices for
Sidetracking.
RIH with 3-1/2", 9.2#, L-80, STL solid/slotted liner with 3-1/2" x 5-1/2 .... packer/hanger spaced
out for 150' of lap.
Cement the liner in place from the external casing packer at 10164' MD to 200' above the
liner top.
Set liner hanger and packer. Unsting running tool and reverse circulate excess cement
from the wellbore. POOH.
Test casing to 3500 psi for 30 minutes.
RIH with. 4.!/2" L-80 Ltc-Mod completion with SSSV at 500' MD, 2 GLMs, and 7-5/8"x 41/2"
packer. Set packer and test tubing to 4000 psi. Refer to the Recommended Practices for
Running Tubing, V3.2.
5-25A Redrill Plan Summary Page 3
13.
14.
15.
16.
Set TWC valve. Test to 1000 psi. ND BOPs.
NU tubing head adapter and tree. Test same to 5000 psi. Pull TWC. Test 41/2'' x 7-5/8"
annulus to 3500 psi with 2000 psi on tubing. Shear RP valve.
Freeze protect well through shear valve in top GLM station.
Release rig. Complete appropriate documentation and handover to Production.
Post-Riq:
17. MIRU coiled tubing unit.
18. PU 2-1/2" bit and motor assembly.
19. RIH to top of 3-1/2" liner and cleanout cement to 10164' MD. RIH to 11743' TD to insure a
clean wellbore.
RDMO coiled tubing unit.
20.
5-25A Redrill Plan Summary Page 4
JUL 15 '96 02:32PM ALASKA~. HALLIBURTON DRILLING P.2/4 .....
BPX - 3ho. r"ed ~er'vices Dr, illlng /
Al~sk~ State Plane', Zone4 ~ / ', ..... ~'~-c~-~ Il
m u:
05- BSA
g'316-ts?43 ~O,O'3 ~BD I
ID l.~x-'5;' ~].Ul 1~1 I'-,.PP. Ii J
I CRITICAl_ PE~Nf I]ATA
l~ / TIE IN / ~ ~.~ ~.7g ~16 6F3 S ~0 ~
/ S'I~T D ~16 ~.~ E~.~ ~3 678 S ~1 ~
TVD 9044.30
MD ! 1743.00
I~S 4~4t .4g
~..704.4g
E/W ~--~7,4 !
VERTICAL VIEW
.SCALE 100 Ce. / DIVISION
TVg REF: ~-LLI~AD
YERTICAL SECTI~ ~F, ~LL~
PE~RIZ[]~] AL VIEw (TRUE NORTH}
SCALE 500 f~. / DIVISION
SURVEY REF; ~F~.LLI-~AD
Halliburton Energy Services. Drilling Systems PSL
Proposal Report
Coml~ftd using Wi~I-C,(DDS liEF2. 2.2
Vuticnl Section Pl~c: 23038 dcg.
Dale: 7115/96
Time: 12:04 pm
Wctlpalh ID: 05-25A Wp5
Last R~isioa: 7/15/96
BPX- Shared Scrviecs Drilling
Alaska Stat<: PIs~e~ Zonc.4
PBU: EOA: DS05
05.25A As-built
05-25A Wp5
~D
LO
X
Mcasurc, d la¢l DrlR Subscn TV]) Course. TOTAL GPdDCoordinates Clos~ . Vcr[kal Build 'W~lk DIS Corn. ExpccledTelal MaxHor MLnHo: Dk Vcfl
Depth Dir. Depth t,cng~ R~x'tmgulwOffsets Northing Eal~g DisL Dit. ~clion Rate Rate Dogleg Rectangular Coords [nm ga*of IVbx Err Error
(a) (deg.)(d~g.) (a) (f~) (l~) (a) (a) (n) (l~) (a) (d~:~.)(n.)(d~/lO0a) (dyl00n) (dg/teon) (d~ (n) (a) (a) (~) (deg.)
9263.i5 32.87 261,11 8399.39 846S,59 27.60 667.87S 2539.6CW 5948154.60 694724.65 2625,95~255.27 2382.22 0.51 ..0.14 O.Si 21.4 667.87S 2539.6CW 60.80 34.66 348,58 30.35 BPH&PBD
9225.20 32,87 261.02 8416,23 6485.43 20.05 669.565 255035W 594Sl52.63694713.95 2636.7~$.29 2391.58 0.0O .0.45 0.24 71.5 6fi9.56S 2556,35W 61,60 34,74 348,57 30.42
9230,84 3237 260.98 8422,65 8491.85 ?.64 670,21S 2554.44W 5948151.88 694709,87 2640.90~255.30 2395,15 0.00 .0.52 0,28 71.5 67021S 2554.44W 61,08 3437 348.57 30.44 BPHG.PBD
9258.65 32.68 260,80 8446.03 8515.23 27.81 672.595 2569.31W 5948149,11 694695.07 2655,89{~25533 2408.12 4),68 .0.65 0.?7 '/1,7 672.59S 2569.31W 61.36 34.95 348,54 30.45 BPHO.?BD
TZ4B /TSAD
9259,80 32.69 260.80 8447.00 851620 1,15 672,698 2569.92W 5948149.00 694694.46 2656.51r~25533 2408,66 0.97 O,00 0.97 71.7 672.698 2569.92W 61,37 3,4,95 341].54 30A6 BPHG-PBD
KOP ! TiE IN l INTERPOLATED POINT ! START OF CURVE @ 6.00 d~f/100 fl
9260.00 32,67 2~39 8447,16 8516,36 0.20 6TL?I S 2570,03W 59-18148,98 69469435 2656.61t~}25533 2408.75 -12,19 -3.20 12.31 71.11 672,71 $ 2570,03W 61.37 34.96 348,54 30,45 BPHG-PBD
START OF CURVE @20.00 deg/100 I~
9316.04 36.00 2,60,00 8493.4,4 8562,64 56.(}4 6?7.995 2601.1~g 5948142.89 69466334 2658.0~25539 2436.12 5,95 -IAI 6.00 75A 679.14S 2600.9&W 61.60 33.76 348,46 31,92 BPHM-PBD
9416,04 20.82 231.45 858132 8650,72 100.00 694.333 2644.47W 5948125.44 694620.50 2'/34.LQ~155,29 2479.88 -ISA8 -28.55 20.00 95.1 695,95S 2613.8~W 61.94 39.19 345.72 25,95 BPI~-PBD
I~D OF CURVE
9448.16 17.91 214,{}7 8611.84 8~1.~, 32.12 701,995 2651.7CW 5948117.60 694613.47 2743.0~255.17 2490.33 -9,05 -54.13 20.00 101,5 703.67S 2651.04W 61.78 40,27 345.6[ 24.99 BPI-IM-PBD
9456,73 17,91 214.07 8620,00 ~89.~0 8,5'/ 704,17S 265'3.18W 59481t538694612,05 2745,04~255,14 2492,86 0.00 0.00 0,00 101.5 705.875 2652A~'W 61,81 40,27 34537 25.01
TZ2C
9528.20 17.91 214,07 8658,0~) 8757,20 71.46 722385 2665.49// 5948096.86694600.22 2761.64{i}254.842513.96 0.0~) 0.00 0.00 101,5 ~243.05 2664.61W 62.{)5 4032 345.28 25.11 BPIfl~-PBD
START OF CURVE@ 20,00 deg/100 ii
9602,32 17,91 214.07 8758.53 8827.'/3 74,12 741.26S 267826W 5948077.66 694587,94 2778.95~254,53 2535,83 -0.00 0,00 0.00 101.5 743228 2677.18t// 62,31 40,38 344.96 25.21 BPI-IM-P]~D
TZ2A
9700,14 36,95 203.72 8845.00 8914.20 97.82 781.03S 2698.71W 5941103738 694568,54 2809.~3.16 2576,94 19A7 -10.58 20.00 121.l 783,33S 2696.84W 60,'/6 38.37 338AZ 32.80 BPHM-PBD
9702.32 37,38 203,60 S846.74 8915,94 2.lg 782.235 26~.24W 5948036.16 694568.04 281(}3(~1253.[4 2578.12 1933 -5,45 ~.(}0 121.5 ?MSSg 2697.3~ 60.72 38,31 331],25 32.98 BPHM.PBD
TZIB
9777.64 52,29 200.52 S900,00 8969.20 7532 831.378 ..2718,95W 5947986.53 694549.61 2843,21~,253.00 2624.63 19.80 -4.08 20,00 136.6 IL34.04S 2716,11W 59.46 35,93 331.85 38,89 BPHM-~D
9802.32. 57.19 199.79 8914.25 8983.45 24.68 850,29S 2725.8~ 5947967.44 694543,1'/ 2855.4~252.68 2642,04 19,85 -2,98 20.00 141,5 853.085 2722.71W 5~.15 35.06 329.84 4~).57 BPHM-PBD
.................. nat na~ ,ma'ms~ no t~oa,~la fa 2R72.0~.23 2665,77 19,87 -2,63 20.00 147.9 879,3? S 2731.41W 58.88 3~},97 327.44 42.47 BPHM-PBD
Halliburton Energy Services - Drilling Systems PSL
Proposal Report
Mc~u~d Inci l~ifl gubscn TV]) Coune TOTAL GPdDCom-din~lcs Closure Vc~ticat B~d W~k DLS Cum, E~pccl~dToL~! rv'tsxHof MinHor Dif,
~.32 77,07 I~.41 ~952,91 9~2.11 68.12 ~7,~S 2754.~ 5~7979.806~51634 2910,0~251,21 2719,~9 19.89 -2.25 20,00 161.S 9~.52S 2750~1W 58,81 32.14 323,42 45.3~
99~.86 89.52 196.15 8960,20 ~9.40 62,54 ~6,57S 2772,8~ 594782~.~ ~4~00,00 29~.~250.~ 2771.~1 19.90 -2.02 ~.00 174,0 1000.17S 2767,0~ 5932 ~1.~ 32t37 ~,32 BP~-PBD
Top Kavik / BS~
11134.54 89.52 196, t5 g970.~ 9029,20 11~.68 2120.~S ~8.1~ 5946~8.~6 6~4,00 3754.1~35,~ 3738.48 ~.00 0.00 0.~ 174.0 2129,~9S 3073,2~V S7,U 33.~2 30~,~ 49,88 BP~-PBD
Dalc: ?I15~>
WclIp~ ID: 5S-25A Wp:~
Survey Tool
CASING POINT OD: 3 1/2 ilk ID = 2.97 ilk Wcl~t = 9.30 lb/IL
11742.9S 89.52 196.15 8975,10 9044.30 608,44 27(}4,47S 3267.4CW $946100.02 694050.00 4241.4'~:~230.38 4241.47 0,00 0,00 O,0a 174.0 2704.475 3267.4LW 0,00 0.04) 0.00 0.00 BPHM-PBD
ESL
11743.0,0 89.52 196,15 8975.10 9044,30 0,02 2704.495 3267.41W 5946100.00 694050,00 4241,49{~230,38 4241.49 4)23 0.09 0.25 174.0 2716.495 3232,59W i07.27 34.45 301.06 52,76 B?HM-PBD
"----' STATE OF ALASKA
ALASKA_ (J,~. AND GAS CONSERVATION COMM,,SSION
APPLICATION FOR SUNDRY APPROVAL
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
1. Type of Request: [] Abandon I"-1 Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack
2. Name of Operator 15. Type of well: 6. Datum Elevation (DF or KB)
I
[] Development RKB = 66'
ARCO Alaska Inc. I-I Exploratory 7. Unit or Property Name
[] Stratigraphic Prudhoe Bay Unit
[] Service
4. Location of well at surface
2558' SNL, 173' EWL, SEC~ 32, T11N,'R15E
At top of productive interval
2049' NSL, 2397' WEL, SEC. 31, T11N, R15E
At effective depth
At total depth
1989' NSL, 2759' WEL, SEC. 31, T11N,-R15E
8. Well Number
05-25
9. Permit Number
89-121
10. APl Number
50-029-21988
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
10037 feet
9200 feet
9986 feet
9154 feet
Length
Size
Structural
Conductor 110' 20"
Surface 3424' 10-3/4"
Intermediate
Production 9156' 7-5/8"
Liner 1157' 5-1/2"
Plugs (measured)
Junk (measured)
PBTD Tagged @ 9986' MD (04/25/96)
Cemented MD TVD
2150# Poleset
1000 sx CS III, 350 sx CI G, 157 sx CS III
410 sx CIG
155 sx Cl G
110' 110'
3490' 3489'
9220' 8482'
10031' 9195' .
Perforation depth: measured
true vertical
Tubing (size, grade, and measured depth) 3-1/2", L-80 to 8841'
2-7/8", L-80 to 9698'
Anchorage
Packers and SSSV (type and measured depth)
Baker SB-3A Perm Packer @ 8624' MD, Baker FB-1 Perm Packer @ 9666'
MD, 3-1/2" AVA TRSV @ 2198' MD
13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch
14. Estimated date for commencing operation 15. Status of well classifications as:
07/24/96
16. If proposal was verbally approved [] Oil I-] Gas [] Suspended
/ . ¥ Service
Name of approver / ~'~"~ Date approved
Contact Engineer Name/Number:\ p/Ii 'Bardwell, 564-4809 Prepared By Name/Number
17. i hereby certify that.,tbe-fe{e~loing is true and correct to the best of my knowledge
Signed p,b, "---7-/i/
TenTJordan (.,,/ t I (A/~ " Title Senior Ddlling Engineer
-- Commission Use Only
Conditions of Approval: Notify Commission so representative may witness
Terde Hubble, 564-4628
Date '~/l~r/ ?~'
JApproval No. /~:,--."/.-'~//
Plug integrity ..
Mechanical Integrity Test__
Approved by order of the Commission
BOP Test __
Location clearance ~
Subsequent form required 10-
Commissioner
Date
Form 10-403 Rev. 06/15/88 Submit In Triplicate
· WELL PF'R~IIT CHECKLIST COMPANY ,/~/'~"~.. ,~VELL NAME,/9~-.-f ._,~'-.~...~ PROGRAM: exp [] dev~L/reddNserv [] wellbore secj __: ann. disposal para req ~
FIELD&POOL ~' .~),,),_~"'d:~ INITCLASS /~___.4J //-o, ..... GEOLAREA ??~,~'~ . UNIT# //',,/~'._~d'"'~ ON/OFFSHORE
ADMINISTRATION
ENGINEERING
APPR ~
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
Permit fee attached .......................
Lease number appropriate .................... Y
Unique well name and number ................ Y
Well located in a defined pool ................. Y
Well located proper distance from drlg unit boundary ..... '.Y
Well located proper distance from other wells .........
Sufficient acreage available in drilling unit ..........
If deviated, is wellbore plat included ............... Y
Operator only affected party .................. Y
Operator has appropriate bond in force ............ Y
Permit can be issued without conservation order ...... Y
Permit can be issued without administrative approval .... Y
Can permit be approved before 15-day wall ........ L~Y
,,
'N
N
REMARKS
Conductor string provided ................... Y' N'"')
Surface casing protects all known USDWs .......... Y NJ
CMT vol adequate to circulate on conductor & surf csg .... Y N[ ~ '
CMT vol adequate to tie-in long s~ng to surf csg ....... _Y. ~ ,~ "/;.,, ,4
CMT will cover all known productive horizons .........
Casing designs adequate for C, T, B & permafrost. ..... (,~N
Adequate tankage or reserve pit ................ ~ N
/1____
If a re-drill, has a 10-403 for abndnmnt been approved .... ,.~ N
Adequate wellbore separation proposed ............ ~ N A.,)./,jr.-
If diverter required, is it adequate ................
Ddlling fluid program schemalJc & equip list adequate .... N
BOPEs adequate ........................ ,N,
BOPE press rating adequate; test to ~- O~ psig.,, ~_~-
Choke manifold complies w/APl RP-53 (May 84) ....... N __
Work will occur without operation shutdown ..........
Is presence of H2S gas probable ...............
GEOLOGY
30. Permit can be issued W/O hydrogen sulfide measures ..... Y N/,/~ ~) ~
31. Data presented on potential overpressure zones ....... Y/N ,/fl-.,/,// ¢ ,,~
32. Seismic analysis of shallow gas zones ............. ~ .N. '
33. Seabed condition survey (if off-shore) ........... //. Y N
34. Con-tact name/phone for weekJ~ progress, report? ,.... ~/.. Y N lexp~ora~ry on~/j
GEOLOGY: ENGINEERING: COMMISSION:
J D H'-'~:?'[..Z-7/.-~ JDN
TA~
Comments/instructions:
HOW4~ - A:'CORMS~:heklis"t rev 4.,'96
Well History File
APPENDIX
Information of detailed nature that is not
particularly
germane to the Well Permitting Process
but is part of the history' file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Drilling Services
LIS Scan Utility
Sat Apr 12 13:00:53 1997
Reel Header
Service name ............. LISTPE
Date ..................... 97/04/12
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Tape Header
Service name ............. LISTPE
Date ..................... 97/04/12
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Physical EOF
Comment Record
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
APR 1 6. '!997
DS 05-25A ~chor~e
500292198801
ARCO A~S~, INC.
SPERRY-SUN DRILLING SERVICES
12-APR-97
MWD RUN 2 MWD RUN 5 MWD RUN 6
AK-MW-60098 AK-MW-60098 AK-MW-60098
M. HALL M. HALL M. HALL
R. BORDES R. BORDES R. BORDES
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 7 MWD RUN 9 MWD RUN 9
AK-MW-60098 AK-MW-60098 AK-MW-60098
M. HALL M. HALL M. HALL
R. BORDES R. BORDES R. BORDES
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
MWD RUN 10
AK-MW-60098
M. HALL
R. BORDES
MWD RUN 11
AK-MW-60098
B. HENNINGSE
R. BORDES
32
lin
15E
MWD RUN 12
AK-MW-60098
B. HENNINGSE
R. BORDES
FSL: 2588
FEL:
FWL: 173
ELEVATION (FT FROM MSL 0)
KELLY BUSHING: 72.10
DERRICK FLOOR: 68.40
GROUND LEVEL: 34.00
WELL CASING RECORD
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 10.750 3493.0
2ND STRING 7. 625 9223.0
3RD STRING 5.500 9286.0
PRODUCTION STRING 4.750 11916.0
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. WELL 05-25A IS REPRESENTED BY RUNS 1, 2, 5, 6, 7, AND
9 THROUGH 12.
3. ALL GAMMA RAY DATA IS ACQUIRED WITH NATURAL GAMMA
PROBE/SCINTILLATION TYPE
DETECTORS AND IS DENOTED NGP/SGRD.
4. RUN 1 WAS A MILL RUN TO CUT A WINDOW IN THE CASING
AND NO DATA IS PRESENTED.
5. RUNS 2, 5, 6, AND 9 THROUGH 12 ARE DIRECTIONAL WITH
GAMMA RAY (SGRD).
6 RUNS 3, 4, AND 8 WERE ABORTED DUE TO TOOL AND
DOWNHOLE PROBLEMS AND NO
DATA IS PRESENTED.
7. RUN 7 IS DIRECTIONAL ONLY AND ONLY RATE OF
PENETRATION (SROP) IS USED FROM
THIS RUN.
8. GAMMA RAY (SGRD) OVER DEPTH INTERVAL DRILLED DURING
RUN 7, 9906' TO 9971'MD
(9027' TO 9043' TVD), ACQUIRED WHILE TRIPPING IN TO
START RUN 9.
9. RATE OF PENETRATION (SROP) DATA MISSING OVER DEPTH
INTERVAL 11796' TO
11809' MD (9055' TO 9054' TVD).
10.WELL 05-25A IS DRILLED TO TOTAL DEPTH (TD) @ 11916'
MD (9055' TVD).
SGRD = SMOOTHED GAMMA RAY.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
Coherent Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SLrMPLARY
PBU TOOL CODE START DEPTH STOP DEPTH
ROP 9/_43.5
GR · 9245.5
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH GR
9245.5 9229.5
9275.0 9259.0
9279.5 9263.5
9283.0 9267.0
9317.0 9300.0
9336.0 9319.0
9346.0 9329.0
9353.0 9336.5
9377.0 9359.0
9383.0 9363.5
9393.0 9375.0
9406.0 9387.5
9408.5 9389.0
9410.5 9394.0
9412.5 9396.0
9415.0 9397.5
9431.0 9413.0
9444.0 9427.5
9470.5 9454.0
9495.0 9479.0
9631.5 9615.0
9633.5 9616.5
9637.0 9620.5
9640.5 9623.5
9644.5 9627.5
9651.5 9635.0
9659.5 9644.0
9667.0 9651.0
9691.5 9674.5
9713.5 9697.0
9720.0 9702.5
9723.5 9706.5
9742.0 9725.0
9746.0 9729.0
9750.0 9733.0
9765.5 9749.0
9776.0 9759.0
9786.5 9768.5
9792.5 9775.0
9801.0 9784.0
9809.0 9792.0
9824.0 9807.0
9843.5 9827.5
9850.0 9833.5
9856.5 9841.5
9893.0 9874.5
9898.0 9879.5
9914.5 9895.5
9919.5 9901.0
9924.5 9906.5
9934.0 9914.0
9961.5 9945.0
1932.5 11916.0
MERGED DATA SOURCE
11932.5
11878.5
EQUIVALENT UNSHIFTED DEPTH --
PBU TOOL CODE ~' RUN NO MERGE TOP
MWD 2 9259.0
MWD 5 9513.0
MWD 6 9892.0
MWD 7 9962.0
MWD 9 10035.0
MWD 10 10541.0
MWD 11 10857.0
MWD 12 11511.0
$
REMARKS:
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point ............... Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
MERGE BASE
9513.0
9892.0
9962.0
10035.0
10541.0
10857.0
11511.0
11916.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD AAPI 4 1 68 4 2
ROP MWD FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 9243.5 11932.5 10588 5379 9243.5
GR 16.6137 343.28 40.8068 5267 9245.5
ROP 4.9162 5772.66 148.008 5345 9243.5
Last
Reading
11932.5
11878.5
11932.5
First Reading For Entire File .......... 9243.5
Last Reading For Entire File ........... 11932.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
EDITED MERGED MAD
Depth shifted and clipped curves; all MAD runs merged using earliest
passes.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
REMARKS:
.5000
START DEPTH STOP DEPTH
9890.5 10489.5
MAD RUN NO. MAD PASS NO. MERGE TOP
9 9890.5
MERGED MAD PASS.
$
MERGE BASE
10489.5
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
Name Min Max
DEPT -999.25 -999.25
First Last
Mean Nsam Reading Reading
-999.25 0 2.25401e+14 5.96365e-39
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Previous. File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
ROP 9227.5
GR 9229.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9513.0
9455.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
REMARKS:
07-AUG-96
ISC 4.54
DEP 2.042 / NGP 5.74
MEMORY.
9513.0
9259.0
9513.0
13.4
29.6
TOOL NUMBER
NGP 156
4.750
4.8
FLO-PRO
8.90
105.0
8.5
.0
.000
.000
.000
.000
44.5
.3
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 2 AAPI 4 1 68 4 2
ROP MWD 2 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 9227.5 9513 9370.25 572 9227.5
GR 16.6137 343.28 41.45 452 9229.5
ROP 5.5363 4717.97 407.178 572 9227.5
Last
Reading
9513
9455
9513
First Reading For Entire File .......... 9227.5
Last Reading For Entire File ........... 9513
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEkDER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9451.0 9836.0
ROP 9508.0 9891.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OH/V94) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
09-AUG-96
ISC 4.54
DEP 2.042 / NGP 5.74
MEMORY
9892.0
9513.0
9892.0
14.8
60.4
TOOL NUMBER
NGP 53
4.750
4.8
FLO- PRO
8.90
75.0
8.5
5.2
.000
.000
.000
.000
49.2
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 5 AAPI 4 1 68 4 2
ROP MWD 5 5'~/H 4 1 68
8 3
Name Min Max Mean Nsam
DEPT 9451 9891.5 9671.25 882
GR 22.0276 149.012 45.5765 771
ROP 7.3167 4616.02 91.1826 768
First Last
Reading Reading
9451 9891.5
9451 9836
9508 9891.5
First Reading For Entire File .......... 9451
Last Reading For Entire File ........... 9891.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/!2
Maximum Physical Record..65535
File Type ................ LO
Next File Name ............ STSLIB.005
Physical EOF
File Header
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9840.0 9906.0
ROP 9894.5 9962.0
$
LOG HEADER DATA
DATE LOGGED: 10-AUG-96
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: .0
MAXIMUM ANGLE: .0
I$C 4.54
DEP 2.042 / NGP 5.74
MEMORY
9962.0
9892.0
9962.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):.
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TE.RMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
TOOL NUMBER
NGP 53
4.750
4.8
FLO- PRO
8.90
75.0
8.5
5.2
.000
.000
.000
.000
49.2
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 6 AAPI 4 1 68 4 2
ROP MWD 6 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 9840 9962 9901 245 9840
GR 31.9445 138.748 59.1307 133 9840
ROP 13.0758 933.398 123.151 136 9894.5
Last
Reading
9962
9906
9962
First Reading For Entire File .......... 9840
Last Reading For Entire File ........... 9962
File Trailer
Service name ............. STSLIB.005
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.006
Physical EOF
File Header
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB'.005
Comment Record
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 7
DEPTH INCREMENT: .5000
FILE SUMNARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
ROP 9964.0 10034.5
$
LOG HEADER DATA
DATE LOGGED: Il-AUG-96
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 68.9
MAXIMUM ANGLE: 85.4
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM) :
ISC 4.54
DEP 2.042 / NGP 5.74
MEMORY
10035.0
9962.0
10035.0
TOOL NUMBER
NGP 188
4.750
4.8
FLO- PRO
8.90
68.O
8.0
FLUID LOSS (C3):
· RESISTIVITY (OH~M)AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value...~ ................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
5.3
.000
.000
.000
.000
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD 7 FT/H 4 1 68 4 2
49.2
First
Name Min Max Mean Nsam Reading
DEPT 9964 10034.5 9999.25 142 9964
ROP 33.5689 440.599 99.5852 142 9964
Last
Reading
10034.5
10034.5
First Reading For Entire File .......... 9964
Last Reading For Entire File ........... 10034.5
File Trailer
Service name ............. STSLIB.006
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.007
Physical EOF
File Header
Service name ............. STSLIB.007
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Re~rd..65535
Fi~e Typ~ ................ LO
Previous File Name ....... STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 9
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9906.5 10489.5
ROP 10022.5 10540.5
$
LOG HEADER DATA
DATE LOGGED: 15~AUG-96
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 86.2
MAXIMUM ANGLE: 92.6
ISC 4.54
DE? 2.042 / NGP 5.74
MEMORY
10541.0
10035.0
10541.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 188
BOREHOLEAND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
4.750
4.8
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO-PRO
9.00
68.0
9.0
5.6
.000
.000
.000
.000
56.3
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.3
REbiARK S:
Data FormatJ Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 9 AAPI 4 1 68 4 2
ROP MWD 9 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 9906.5 10540.5 10223.5 1269 9906.5
GR 20.9996 234.843 53.2639 1167 9906.5
ROP 4.9162 459.668 79.356 1037 10022.5
Last
Reading
10540.5
10489.5
10540.5
First Reading For Entire File .......... 9906.5
Last Reading For Entire File ........... 10540.5
File Trailer
Service name ............. STSLIB.007
Service Sub Level Name..,
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.008
Physical EOF
File Header
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 10
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10463.5 10806.0
ROP 10310.5 10857.0
$
LOG HEADER DATA
DATE LOGGED:
S O FTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 88.3
MAXIMUM ANGLE: 92.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 4.750
DRILLER'S CASING DEPTH (FT) : 4.8
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3): 4.8
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT): .000
MUD AT MAX CIRCULATING TERMPERATURE: .000
MUD FILTRATE AT MT: .000
MUD CAKE AT MT: .000
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): .3
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .lin
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Dattun Specification Block sub-type...0
17-AUG- 96
ISC 4.54
DEP 2.042 / NGP 5.74
MEMORY
10857.0
10541.0
10857.0
TOOL NUMBER
NGP 38
FLO-PRO
9.00
62.0
9.0
60.9
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 10 A~FI 4 1 68
RO? MWD 10, FT/H 4 1 68
4 2
8 3
First Last
Name Min Max Mean Nsam Reading Reading
DEPT 10463.5 10857 10660.2 788 10463.5 10857
GR 18.8996 205.491 40.9913 686 10463.5 10806
ROP 11.2022 5930.86 138.75 694 10510.5 10857
First Reading For Entire File .......... 10463,5
Last Reading For Entire File ........... 10857
File Trailer
Service name ............. STSLIB.008
Service Sub Level Name...
Version Number ........... 1.0.0 ·
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.009
Physical EOF
File Header
Service name ............. STSLIB.009
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.008
Conuuent Record
FILE HEADER
FILE NUMBER: 9
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 11
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10806.5 11459.5
ROP 10858.0 11511.0
$
LOG HEADER DATA
DATE LOGGED: 18-AUG-96
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 84.5
ISC 4.54
DEP 2.042 / NGP 5.74
MEMORY
11511.0
10857.0
11511.0
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
93.1
TOOL NUMBER
NGP 188
4.750
4.8
FLO-PRO
9.00
63.0
9.0
4.8
.000
.000
.000
.000
63.3
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 11 AAPI 4 1 68 4 2
ROP MWD 11 FT/H 4 1 68 8 3
First
Name Min Max Mean Nsam Reading
DEPT 10806.5 11511 11158.8 1410 10806.5
GR 20.9996 98.698 33.0646 1307 10806.5
ROP 13.4997 5772.66 202.083 1307 10858
Last
Reading
11511
11459.5
11511
First Reading For Entire File .......... 10806.5
Last Reading For Entire File ........... 11511
File Trailer
Service name ............. STSLIB.009
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.010
Physical EOF
File Header
Service name ............. STSLIB.010
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535 ~
File Type ................ LO
Previous File Name ....... STSLIB.009
Coraraent Record
FILE HEADER
FILE NUMBER: 10
RAW FFWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 12
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11429.0 11862.0
ROP 11474.5 11916.0
$
LOG HEADER DATA
DATE LOGGED: 20-AUG-96
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: 87.2
MAXIMUM ANGLE: 90.9
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAFR4A PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
ISC 4.54
DEP 2.042 / NGP 5.74
MEMORY
11916.0
11511.0
11916.0
TOOL NUMBER
NGP 38
4.750
4.8
FLO-PRO
9.00
58.0
MUD PH:
~MUD CHLORIDES (PPM): FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
8.5
4.4
.000
.000
.000
.000
.3
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 12 AAPI 4 1 68 4 2
ROP MWD 12 FT/H 4 1 68 8 3
67.9
First
Name Min Max Mean Nsam Reading
DEPT 11429 11916 11672.5 975 11429
GR 18.8996 82.5793 28.7968 867 11429
ROP 9.0807 8718.75 207.258 850 11474.5
Last
Reading
11916
11862
11916
First Reading For Entire File .......... 11429
Last Reading For Entire File ........... 11916
File Trailer
Service name ............. STSLIB.010
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximura Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.011
Physical EOF
File Header
Service name ............. STSLIB.011
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 93/04/12
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.010
Comment Record
FILE HEADER
FILE NUMBER: 11
RAW MAD
Curves and log header data for each pass of each run in separate files.
DEPTH INCREMENT: .5000
MAD RUN NUMBER: 9
MAD PASS NUMBER:
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9890.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER ~ (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM]ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10489.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
15-AUG- 96
ISC 4.54
DEP 2.042 / NGP 5.74
MEMORY
10541.0
10035.0
10541.0
86.2
92.6
TOOL NUMBER
NGP 188
4.750
4.8
FLO-PRO
9.00
68.0
9.0
5.6
.000
.000
.000
.000
56.3
TOOL STANDOFF (IN): .3
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MAD 9 AAPI 4 1 68 4' 2
First
Name Min Max Mean Nsam Reading
DEPT 9890.5 10489.5 10190 1199 9890.5
GR 20.9996 234.843 53.3143 1199 9890.5
Last
Reading
10489.5
10489.5
First Reading For Entire File .......... 9890.5
Last Reading For Entire File ........... 10489.5
File Trailer
Service name ............. STSLIB.011
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/04/12
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.012
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 97/04/12
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Reel Trailer
Service name ............. LISTPE
Date ..................... 97/04/12
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Conunents ................. STS LIS Writing Library.
Scientific Technical
Scientific Technical
Services
Physical EOF
Physical EOF
End Of LIS File
6~00~
sa~!~aS ~u!~o~
peAeAUOO ed!d
~ID/NO/OV
966 L - ~,sn§nv- ~
· J, una
AV~I ~lOH(lfl~ld
DNI V~SVqV ODHV
, Subfile 2 is type: S
.APE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
RUN 1
6772.00
K. RICHARDS
SEE REMARKS
D.S. 5-25A
500292198801
ARCO ALASKA INC.
WESTERN ATLAS LOGGING SERVICES
23-AUG-96
·
RUN 2 RUN 3
32
liN
15E
2558
173
72.13
69.38
34.00
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
5.500 9293.0
4.750 10035.0
AC/CN/GR.
LOGS WITNESSED BY: R. BORDES & H. HAYWOOD.
CIRCULATION STOPPED AT: 2230, Il-AUG-96.
PIPE CONVEYED LOGGING OPERATION.
TOOL WAS RUN WITH NO CENTRALIZATION DUE TO HOLE SIZE
AND DEVIATION.
NEUTRON LOG PARAMETERS:
SANDSTONE MATRIX,
BOREHOLE CORRECTION = 4.750",
CHISM FILTERING IS ACTIVE,
CASING CORRECTIONS OFF,
SALINITY = 0.00 PPM.
THESE LOGS ARE DEPTH REFERENCE FOR THIS WELL, PER E-MAIL
FROM DOUG KNOCK (ARCO).
~E HEADER
£LE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings; depth shifted and clipped curves;
hole data.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GR 9274.0 10004.0
BCS 9274.0 10039.0
2435 9274.0 10007.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH DT
9275.0 9275.0
9275.5
9284.0 9284.5
9287.0
9292.5 9292.5
9294.5
9307.5 9308.0
9317.0 9317.5
9329.0
9336.0 9336.0
9353.0 9352.5
9392.5
9408.0 9407.5
9408.5
9410.5 9410.0
9412.5 9412.5
9444.0 9444.0
9463.5
9467.0 9466.5
9471.0
9489.0
9507.5 9506.5
9523.5 9523.5
9525.5
9533.5 9534.0
9547.5
9556.0 9555.5
9591.5
9593.5 9593.0
9595.5
9599.0 9598.5
9599.5
9604.0
9624.0 9624.5
9632.0
9644.0 9644.5
9654.5
9660.0 9660.0
9662.0
9671.0
9691.5
all runs merged;
EQUIVALENT UNSHIFTED DEPTH
NPHI
9275.5
9283.5
9287.5
9292.0
9294.5
9329.0
9353.0
9392.0
9408.5
9463.5
9467.0
9471.0
9488.5
9508.0
9525.0
9533.5
9547.0
9591.0
9593.0
9595.5
9599.5
9605.5
9631.5
9644.0
9655.0
9662.0
9671.5
9691.0
no case
%fSg-9 'S'G :
· OMI krM~ OOM%f :
J~qO' EHOZ¥~& g /
JJlO' IHOJAf~ 6 /
0'4000I
0'6£00I
O'~O00I
'IHdN HIIM G~i~IHS ~M IOflN ~
'i~ HIIM G~£~IHS ~M SN~£ ~ 'ON~i '~i~
'SS~ Ninny4 ~o uo~od ~OH N~dO
0' fLE6 ~
0' fLE6 ~
0' fLE6 ~
dO,T, .~DH.~N 'ON SS~fd
'ON
9'I966
S'£E66
9'LE66
~'6166
0'L~86
0'6£86
~'PE86
9'9186
9'8086
0'P086
g'86£6
9'96£6
0'E6£6
0'98£6
0'I££6
0'99£6
O'LfL6
0'59L6
0'~L6
9'L[L6
9'9IL6
9'9866
~'E966
0'L~66
9'~f66
0'I~66
9'6166
0'LI66
0'9686
~'0986
0'LI86
9'I086
9'86L6
O'E646
S'98L6
S'99L6
S'0SL6
'69L6
S'9946
9946
S'~946
0'8~L6
'LEL6
S'EOL6
S'IOL6
0' 36
SDS
MGOD ~OOA
9'9866
0'~966
9'£P66
0'9f66
0'If66
0'~£66
S'Lg66
~'6166
S'9166
0'~686
S'0S86
S'L~86
S'E~86
S'I~86
S'6~86
S'9E86
0'~E86
0'LI86
S'8086
S'~086
0'I086
0'66L6
S'86L6
S'S6L6
0'~6L6
S'98L6
0'ILL6
0'99L6
0'9SL6
0'0SL6
S'89L6
~' 99L6
0 ' 99L6
O' ~9L6
~'8£L6
S'L~L6
~'~IL6
~'~OL6
O'~OL6
~0'6696
FN : PR[L )E BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
8 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR BCS 68 1 GAPI 4
2 DT BCS 68 1 US/F 4
3 MTEM BCS 68 1 DEGF 4
4 TEND BCS 68 1 LB 4
5 TENS BCS 68 1 LB 4
6 NPHI 2435 68 1 PU-S 4
7 FUCT 2435 68 1 CPS 4
8 NUCT 2435 68 1 CPS 4
4 57 310 01 1
4 57 530 16 1
4 57 995 99 1
4 57 995 '99 1
4 57 995 99 1
4 43 995 99 1
4 43 995 99 1
4 43 995 99 1
32
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 56
Tape File Start Depth = 10050.000000
Tape File End Depth = 9274.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
13978 datums
Tape Subfile: 2
232 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
pox slO dXi dA£ q~Bua~ ~z!s
A~D A~D 6o~
Id~ Id~ Id~ Id~
s~!ufl ssIdmPs spoo IOOl
:s~A~no 9
d :Gl q~d~p sd~
Hk~fHd EHd H~d~ HMO
(99 #HdXi) ~EODME ~k~OM ·
k~/Sk~i¥ :
HdO~IS HJ.EOM :
X%fM HOHGIqHd :
~SE-S 'S'G :
· DNI k~Sk~%f ODh~f :
~S
N/IOD
NM
ND
'IHdN HIIM GHIMIHS MMMM IDflN ~ ID~d
'SS~d NI¥~ ~o uo!~od H~OH GHS~D
HidH~ ~Hi~IHSNf/
0 ' £Lg6 O' CAE6
O'ILE6 O'IL~6
0'89E6 0'89~6
0'99E6 ~'99~6
~'09~6 ~'09~6
~'L~6 ~'LSE6
0'C~6 0'£~6
~'PgE6
9'8£E6 0'6£E6
9'S£E6 9'~E6
9'EIE6 9'EIE6
0'8£I6 0'8£I6
0'IEI6 9'IEI6
9'8II6 9'8II6
IHdN H£dHG
0 ' PA E6
0' 9LE6
HJ.d.~G d03. S
· 6u!s~o o~u! unx s6oI ~Ioq usdo ~o~ S~AxnD p~dd!Io pu~ pa~!qs
SSlfd NIk54 HqOH GHS~D
:E~~ HqI~
SIq :~clA~ s! £ sI!~qns
1 GRCH 2435 68 1 GAPI 4
2 NPHI 2435 68 1 PU-S 4
3 FUCT 2435 68 1 CPS 4
4 NUCT 2435 68 1 CPS 4
5 TEND 2435 68 1 LB 4
6 TENS 2435 68 1 LB 4
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 16
4 43 310 01
4 43 995 99
4 43 995 99
4 43 995 99
4 43 995 99
4 43 995 99
24
Tape File Start Depth = 9274.000000
Tape File End Depth = 9000.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
3844 datums
Tape Subfile: 3
60 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
l'ape Subfile 4 is type: LIS
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER: 1
1
5
.2500
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9037.0 10005.0
AC 9072.0 10040.0
2435 9044.0 10011.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCI/LATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
14-AUG-96
FSYS REV. J001 VER. 1.1
2230 il-AUG-96
456 14-AUG-96
10035.0
10046.0
9080.0
10040.0
1500.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV
CHT
TEMP
KNJT
GR
CN
KNJT
PCM
KNJT
AC
$
SWIVEL SUB
CABLEHEAD TENSION
TEMPERATURE
KNUCKLE JOINT
GAMMA RAY
COMPENSATED NEUTRON
KNUCKLE JOINT
PULSE CODE MODULATOR
KNUCKLE JOINT
BHC-ACOUSTILOG
TOOL NUMBER
3944XA
3974XA
2806XA
3921XA
1309XA
2435XA
3921XA
3506XA
3921XA
1609EA/1603MA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER' S CASING DEPTH (FT):
LOGGER' S CASING DEPTH (FT):
4.750
9293.0
9274.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
(WBM) FLO- PRO
8.90
67.0
8.5
5.2
186.0
5TgD AT MEASURE~ £EMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN) :
TOOL STANDOFF (IN):
REMARKS: MAIN PASS.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 5-25A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
$6
.037
.100
.000
.102
.000
THERMAL
SANDSTONE
.00
4.750
.0
76.0
186.0
76.0
.0
76.0
.0
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
11 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR AC 68 1 GAPI
2 AC AC 68 1 US/F
3 TEMP AC 68 1 DEGF
4 CHT AC 68 1 LB
5 TTEN AC 68 1 LB
6 SPD AC 68 1 F/MN
7 CNC 2435 68' 1 PU-S
8 CNCF 2435 68 1 PU-S
9 CN 2435 68 1 PU-L
10 LSN 2435 68 1 CPS
11 SSN 2435 68 1 CPS
4 4 60 310 01 1
4 4 60 520 99 1
4 4 60 660 99 1
4 4 60 635 99 1
4 4 60 635 99 1
4 4 60 636 99 1
4 4 43 995 99 1
4 4 43 995 99 1
4 4 43 890 01 1
4 4 43 334 31 1
4 4 43 334 30 1
44
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 202'
Tape File Start Depth = 10050.000000
Tape File End Depth = 8994.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ***'
LIS representation code decoding summary:
Rep Code: 68 64679 datums
Tape Subfile: 4 281 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
0'98I £EO'
0'94 980'
0'98I
~'~
~'8
0'L9
06'8
o~a-o%~
0 ' 9L~6
0'£6E6
O~L'~
0'00SI
0'0P00I
0'0806
0'9P00I
0'S£00I
96-D~-PI 9I£
96-D~-II OGEE
I'I 'H~IA I00P 'A~H SASd
96-O~V-5I
: (,L4) H,~,d~ DNIS%fD S
: (,~,d) H3,d~G ONIStfD S
: (NI).~ZIS ,l~I~ ~IOH
lfJ.lfG DNIS~fD (IN-If-
ND
.I,HD
AIMS
~dAi ~OOi ~GOD %001 HOflN~{A
(NOiiO~ Oi dOi) DNIHIS ~OOi
: NO I S%{~tA
: G.~DDO~I
%f,l,lfG ]R.~CPf.~H DO~I
0 ' EI00I 0' EIq6
0 ' 0~00I 0 ' 0~S6
0 ' S000I 0' SOS6
H.I.d.~G d03. S H,I,d.~G .l,~tfIS ~GOD ~IO0.1, %{OGN~A
OOZE'
I
I
:JRq~N~DNI
's~II~
s~=~dss u! un~ pu~ 'Builds IOO~ 'ssed qm~e ~og e~ep ~ap~q 5oi pu~ s~A~no
S~SSIfd i~~ ~OH N~dO MlfH
SIX :ad3I~ s! 9 aii~qnS ade£
000000'85~6 = q~d~ puH ~II~
O00000'OSOOI = q~d~ ~e~S ~II~
£II :sp~oo~H e~e~ ie~ol
lC ~££ £P P
I0 068 £P P
66 S66 £~ ~
66 S66 £~ ~
66 9£9 09 P
66 ~£9 09 5
66 S£9 09 ~
66 099 09 ~
66 0ES 09 5
I0 0I£ 09 P
~ SdD I 89 SEPE NSS
5 SdO I 89 S£PE NS~ 0I
P ~-Od I 89 SEPE ND 6
~ S-~d I 89 S£PE ~DND 8
~ S-~d I 89 SEP~ DND L
~ NSq/~ I 89 OW ~dS 9
~ ~q I 89 D~ NMil
~ 8q I 89 D~ IHO
P IdWD I 89 D~ MD
pox SlO clKi clX,L q~Buaq szTs
A~D A~D
IdW IdW IdW IdW
s~lu~ ssldmPs spoo IOOl smeM
: s~n-~nD I I
,
0'94
O'
0'9£
O·
OSL'9
00'
MNOiS(INIfS
000 '
g0I '
000 '
00
tfMSlfT~ :
MdO~S HI,ON :
AWE MOHflfl~d :
'DNI t~MSlf/lf ODMtf :
NIIOD
MM
ND
: (MI) ,4.~OCLNlfiS ~IOOi
: (NI) NOIIDMMMOD H%OH
:XiISNM~ XIMi~4
:XIMi~4
:(T%~IMMHI MO ~iIfI4MMHIIdH) HdAi %001
%001 NOMJ~IMN
~£S representation code ~coding summary:
Rep Code: 68 32273 datums
Tape Subfile: 5 190 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 6 is type: LIS
96/ 8/22
01
**** REEL TRAILER ****
96/ 8/24
01
Tape Subfile: 6 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Sat 24 AUG 96 10:40a
Elapsed execution time = 1.98 seconds.
SYSTEM RETURN CODE = 0