Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout197-131STATE OF ALASKA ALASKA OICAND GAS CONSERVATION COMMIS ION RECEIVED n Dl~ n ~ ~nin WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: ^ Oil ^ Gas ^ SPLUG ^ Other ®Abandoned ^ Suspended 2oAAC 2s.~os zoAAC zs.»o ^ GINJ ^ WINJ ^ WAG ^ WDSPL ^ Other No. of Completions Zero 1b. W ®Developme loratory ^ Service Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.: 3/17/2010 12. Permit to Drill Number: 197-131 310-009 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded: 09/08/1997 13. API Number: 50-029-22787-00-00 4a. location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached: 09/23/1997 14. Well Name and Number: PBU Z-03 976 FNL, 1427 FWL, SEC. 19, T11 N, R12E, UM Top of Productive Horizon: 3735' FNL, 3656' FWL, SEC. 19, T11 N, R12E, UM g. KB (tt above MSL): 83.75' GL (ft above MSL): 54.05' 15. Field /Pool s ()~ Prudhoe Bay Field / Prudhoe Bay Total Depth: 3750' FNL, 3674' FWL, SEC. 19, T11 N, R12E, UM 9. Plug Back Depth (MD+TVD): 9467' 8492' Oil Pool 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 599151 y_ 5959100 Zone- ASP4 10. Total Depth (MD+TVD): 10187' 9210' 16. Property Designation: ADL 028262 TPI: x- 601415 y- 5956370 Zone- ASP4 Total Depth: x- 601434 y- 5956356 Zone- ASP4 11. SSSV Depth (MD+TVD): N/A 17. Land Use Permit: 18. Directional Survey: ^ Yes ®No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore: N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD, DIR, GR, RES / AIT, DT / BHC, CNL, LDL, GR, Caliper, SP, MRES, RFT, Numar, RST 22. Re-Drill/Lateral Top Window MD/TVD: NA 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUN'L CASING WT. PER FT. GRADE 'TOP BOTTOM TOP BOTTOM SIZE CEMENTING'RECORD PULLED.' 1. H-40 rfa rf - 0 sx A i e " -/4" 4 14 7" 2 L- 7 3' 8724' 8-1/2" 44 x I ss'G' 4-112" 1 1 1 7' 1 82 I 24. Open to production or injection? ^ Yes ®No 25. TUBING RECORD If Yes, IISt each Interval Open (MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER SET MD / TVD 4-1/2", 12.6#, 13Cr 9505' 9294' / 8320' MD TVD MD TVD 26. ACID; FRACTURE; CEMENT SQUEEZE'ETC. ~ ., DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED - ~~ a't ~~{~« ~~~ ~ ~~ `~ saas~-sasa~ssszo~-sszs Punch Tubin for Pumping Cement 9482' Set ES Drill Squeeze Packer 9467' Pump 5.1 Bbls Cement 9467' Set Whipstock 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date of Test: Hours Tested: Production For Test Period OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing Press. Casing Press: Calculated 24-Hour Rate OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 28. CORE DATA Conventi onal Core(s) Acqui red? ^ Yes ® No Sidewall Core(s) Acquired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 12,(:1~IJIY~~7 ~ ONTINUED ON REVERSE Submit Original Only Ir~~~,J~ APR 0 810 c~~1. yl - `(• z 1 • ~a ,,..Y/~/,~, 29. GEOLOGIC MARKERS (List all formations and ma encountered): 30. MATION TESTS • NAME MD TVD Well Tested? ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Sag River 9684' 8708' None Shublik 9708' 8732' Shublik B 9763' 8787' Shublik C 9785' 8809' Sadlerochit 9842' 8866' Zone 3 10121' 9144' Formation at Total Depth (Name): 31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~ v7 ~~o Signed: Terrie Hubble Title: Drilling Technologist Date: PBU Z-03 197-131 310-009 Prepared ByName/Number. Terrie Hubble, 564-4628 Well Number Permit No. /Approval No. Drilling Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI (Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only • • Z-03, Well History (Pre Rig Sidetrack) Date Summary 2/6/2010 WELL S/I ON ARRIVAL. TAG FISH @ 9476' SLM W/ 3.70" DUMMY WHIPSTOCK. SET 4 1/2" X- CATCHER SUB @ 9248' SLM / 9273' MD. PULLED BK-OGLV FROM STA# 1 9185' SLM / 9201' MD, PULLED BK-LGLV FROM STA# 5 @ 7195' SLM, 7217' MD. 2/7/2010 PULL BK-LGLV FROM STA# 3 @ 8420' SLM / 8440' MD, STA# 7 @ 5560' SLM / 5577' MD, STA# 9 @ 3247' SLM / 3264' MD. SET BK DMY-GLV IN STA# 9 @ 3247' SLM / 3264' MD, STA# 7 @ 5560' SLM / 5577' MD, STA# 5 @ 7195' SLM / 7217' MD STA# 3 @ 8420' SLM /8440' MD, STA# 1 @ 9185' SLM /9205' MD. PULLED 4 1/2" X- CATCHER SUB FROM 9248' SLM / 9273' MD (empty). MIT-IA TO 3000#, PASS. WELL S/I ON DEPARTURE, PAD OP NOTIFIED. 2/11/2010 T/I/0=0/360/0 MIT x OA passed to 2000 psi (pre CT). Pumped 1 bbl DSL to pressure up OA to 2000 psi. OA lost 100 psi in 15 minutes and 40 psi in the second 15 minutes for a total 30 minute loss of 140 psi. Bled OAP (1.4 bbls fluid). FWP's=0/360/0+ 3/1/2010 WELL SHUT IN UPON ARRIVAL. INITIAL T/I/O: 0/300/0 TUBING PUNCHED FROM 9488.5' - 9493.5' WITH MEDIUM PUNCHERS. TUBING PUNCHED FROM 9320' - 9325' WITH MEDIUM PUNCHERS. SET EZ DRILL SVB SQUEEZE PACKER. TOP OF SQUEEZE PACKER AT 9482' MID ELEMENT AT 9483'. FINAL :350 300 0 3/4/2010 T/IA/OA= SI/380/0 Temp=S1 PPPOT-T (PASS) (Pre CTD) PPPOT-T : RU 2 HP BT onto THA 500 psi bled to 0 psi, flush void until clean returns achieved. Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bleed void to 0 psi, RD test equipment, re-installed Alemite caps. Cycle and torque LDS "ET style" all functioned with no problems. 3/8/2010 MIRU CTU #8 w/ 1.75" coil. MU/RIH w/ BOT MHA/HAL 3.6" OD Star Guide stinger. Flag CT @ 9450'. Tag retainer @ 9478'. Correct counter to +4'. Stack 7-8k# down. Establish circ down coil/up backside. Circ bottoms up through coil, returns from IA, through tubing punches, and up backside. Pump 5.1 bbls 15.8#,r cement. Unsting from retainer lay 1 bbl of cement on top of retainer. Jet back down to 9470' twice chase out of hole washing jewelry. At surface popoff well change to BHA #2 w/ 3.8" mill. 3/9/2010 MU/RIH w/ BOT BHA#2 w/ 3.8" mill. Stop at flag correct depth to 9463.3'. RIH milling to 9478' make three passes. Go dry tag 9487.6' pump last gel pill chase out of hole. Inspect bad pipe @ 7253'. Drop 0.75" ball, open circ sub, continue chase out. Perform MIT of tubing to 1000 psi. Perform tubing MIT- Passed/OK. Blow down reel. RDMO. Job in complete. 3/9/2010 WELL S/I ON ARRIVAL. CURRENTLY RIGGING UP SLICKLINE UNIT TO DRIFT FOR WHIPSTOCK. 3/10/2010 DRIFTED & TAGGED FISH WITH 20' x 3.70" DUMMY WHIPSTOCK @ 9498' SLM (NO PROBLEMS). WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED. 3/11/2010 WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O = 100/0/0 PSI. SET TOP BAKER 4-1/2" WHIPSTOCK AT 9467.0', BOTTOM OF WHIPSTOCK SET AT 9479.4'. 2 RA PIP TAGS IN WHIPSTOCK AT 9475.6'. WS O I I 2 D G EES LEFT OF HIGH SIDE.~ONE METAL WHEEL 1" DIAMETER AND 1/8" THICK FELL OFF TOOL AND LEFT IN HOLE. FINAL T/I/O = 100/0/0 PSI. WELL SHUT-IN ON DEPARTURE, DSO NOTIFIED, JOB COMPLETE. Page 1 of 1 BP EXPLORATION Operations Summary Report Legal Well Name: Z-03 Page 1 ski Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: REENTER+COMPLETE Start: 3/10/2010 End: 3/27/2010 Contractor Name: NORDIC CALISTA Rig Release: 3/27/2010 Rig Name: NORDIC 2 Rig Number: N2 Date From - To Hours Task Code NPT Phase Description of Operations 3/13/2010 23:00 - 00:00 1.00 RIGD P PRE MOVE RIG OFF OF MPF PAD. 3/14/2010 00:00 - 20:35 20.58 RIGD P PRE MOVE RIG FROM MPL PAD TO SPINE ROAD. MOVE RIG FROM SPINE ROAD TO Z PAD ACCESS ROAD. MOVE RIG DOWN Z PAD ACCESS ROAD & ONTO THE BACKSIDE OF Z PAD. 20:35 - 20:37 0.03 RIGD P PRE ARRIVE ON THE BACKSIDE OF Z PAD. 20:37 - 00:00 3.38 RIGD P PRE LD HERCULITE LINER. RU OA HOSE FOR GAUGE READINGS. RU T-MATS. DISCOVER THAT WE CAN"T SPOT STRAIGHT ON WELL AS WE LOSE THE ABILITY TO LOWER THE REEL TO THE GROUND DUE TO ELECTRICAL BOXES & WALKWAY IN FRONT OF THE RIG. DISCUSS WITH PAD OP & GET APPROVAL & REMOVE LARGE SNOW BERM NEXT TO WALK WAY TO GAIN MORE PAD ACCESS. 3/15/2010 00:00 - 01:00 1.00 RIGU P PRE CONTINUE TO CLEAN SNOW FOR MORE ACCESS IN FRONT OF THE RIG RIG. 01:00 - 03:45 2.75 RIGU P PRE -37F AMBIENT, TAKE FREQUENT WARM UP BREAKS. ATTEMPT TO MOVE RIG OVER WELL. ISSUES ARE: CLOSE PROXIMITY TO ADJACENT WELL & RIG STAIR CASE, SPOTTING AT A ANGLE & T-MAT PLACEMENT & REQUIRED ACCESS FOR REEL SWAP. READJUST T-MATS. SPOT OVER WELL. SPOT CUTTINGS BOX. 03:45 - 06:00 2.25 RIGU P PRE RD ADAPTOR FLANGE. RD CHOKE HOSE. PLACE 2X6'S UNDER CELLAR BOX BEAM. SET RIG DOWN AGAIN. 06:00 - 12:00 6.00 RIGU P PRE ACCEPT RIG AT 06:00 AM. SPOT SECONDARY EQUIPMENT. INSTALL CHOKE HOSE. STAB ROPE. 12:00 - 17:30 5.50 RIGU P PRE ND TREE CAP & NU BOPE. RU THE MPD LOOP. CLEAN PITS OF WELDING AND GLUING DEBRIS. 17:30 - 18:00 0.50 RIGU P PRE CREW CHANGE OUT & PERFORM WALK ABOUNDS. 18:00 - 20:00 2.00 RIGU P PRE C/O BOP RAMS FOR BIG TOOLS. 20:00 - 21:00 1.00 BOPSU P PRE FILL STACK WITH WATER. 21:00 - 00:00 3.00 BOPSU P PRE PERFORM BI-WEEKLY BOPE TEST PER AOGCC BEGS, 250/PSI/3500PSI. LOU GRIMALDI WAIVED WITNESS TO TEST. 3/16/2010 00:00 - 02:30 2.50 BOPSU P PRE CONTINUE TO TEST BOPE PER AOGCC BEGS, 250PSI/3500PSI -PASS. LOU GRIMALDI WAIVED WITNESS TO TEST. 02:30 - 02:45 0.25 BOPSU P PRE PJSM REGARDING RU & PULLING BPV. 02:45 - 04:15 1.50 BOPSU P PRE RU BPV LUBRICATOR. PRESSURE TEST 250PS1/500PSI. PULL BPV. RD BPV LUBRICATOR. ISSUES WITH THE SSV OVER STROKING OPEN, BLEED DOWN SSVP & CLOSE SSV SLIGHTLY. -25PSI WHP. 04:15 - 08:00 3.75 BOPSU P PRE PRESSURE TEST MPD LOOP, 250PSI/3500PS1. 08:00 - 08:20 0.33 BOPSU P PRE BLOW DOWN BOPE. 08:20 - 08:40 0.33 BOPSU P PRE PJSM TO SLIP AND CUT DRILL LINE. 08:40 - 10:45 2.08 BOPSU P PRE SLIP AND CUT DRILL LINE. 10:45 - 11:00 0.25 BOPSU P PRE PJSM TO PU INJECTOR AND PUMP SLACK. 11:00 - 13:00 2.00 BOPSU P PRE CIRC COIL TO WATER. PRESS TEST SWIVEL TO`4300 PSI, PRESS TEST PACK OFF PER AOGCC BEGS 250PS1/3500PSI -PASS. Printed: 3/29/2010 11:46:08 AM • BP EXPLORATION Page 2 >~ Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: REENTER+COMPLETE Start: 3/10/2010 End: 3/27/2010 Contractor Name: NORDIC CALISTA Rig Release: 3/27/2010 Rig Name: NORDIC 2 Rig Number: N2 Date From - To Hours Task Code NPT Phase Description of Operations 3/16/2010 13:00 - 13:45 0.75 STWHIP P WEXIT PUMP SLACK. GOOD E-LINE MOVEMENT. BLOW BACK END OF COIL WITH AIR. 13:45 - 14:00 0.25 STWHIP P WEXIT SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND MITIGATION FOR CUTTING COIL. 14:00 - 14:45 0.75 STWHIP P WEXIT CUT OFF 300' OF COIL. 14:45 - 16:30 1.75 STWHIP P WEXIT M/U CTC AND PULL TEST WITH 30K. M/U UOC AND TEST E-LINE. 16:30 - 18:30 2.00 STWHIP N SFAL WEXIT REPAIR GUN LINE IN RIG PITS. 18:30 - 19:45 1.25 STWHIP P WEXIT FILL COIL & PRESSURE TEST CTC TO 4000PSI -GOOD. PLACE INJECTOR OVER BUNG HOLE & SWAP REEL TO GEOVIS -PUMP FORWARD TO COMPLETE SLACK MANAGEMENT. OPEN WELL -DEAD & FLOW CHECK FOR 15 MIN WHILE COMPLETING PJSM FOR PU BHA. PREP FLOOR VALVE. SUCK DOWN MPD LOOP. 19:45 - 20:00 0.25 STWHIP P WEXIT PJSM REGARDING MU MILLING BHA. 20:00 - 20:50 0.83 STWHIP P WEXIT MU WINDOW MILLING BHA, MILLS ARE 3.80". PU 5' LUBERICATOR FOR PRESSURE UNDEPLOYMENT. SET BHA IN 3" SLIPS & STRIP OVER WELL, OPEN 3" SLIPS & GET TAG UP MEASUREMENT FOR PRESSURE UNDEPLOYMENT. 20:50 - 23:00 2.17 STWHIP P WEXIT RIH WITH WINDOW MILLING BHA. 23:00 - 23:50 0.83 STWHIP P WEXIT LOG DOWN FOR TIE-IN FROM 8932'. MINUS 45' CORRECTION. 23:50 - 00:00 0.17 STWHIP P WEXIT RIH. 3/17/2010 00:00 - 00:10 0.17 STWHIP P WEXIT RIH & DRY TAG AT 9468'. 00:10 - 06:00 5.83 STWHIP P WEXIT MILL HS WINDOW FROM FIRST MW AT 9467. 7 WHILE SWAPPING WELL TO NEW GEO-VIS. "' Z,-03~ PUMP 1.956PM/2230PSI (REDUCE RATE DUE TO POSSIBLE BACKLASH WITH MOTOR TORQUE & 1-1/2" MT CONNECTION) W/ 50-150 PSI DIFF, 1-2.5K WOB W/ 9.69 ECD PVT 337. TIME MILL 0.1' EVERY 6 MIN. MIX 14 50LB SACKS OF RESINEX INTO MUD SYSTEM. ESTABLISH MILLING PATTERN. BLED DOWN IA FROM 250PS1 to 10PS1. MILLED TO 9473'. 06:00 - 11:00 5.00 STWHIP P WEXIT MILL 3.80" HIGHSIDE WINDOW THRU 4-1/2" AND 7" CASING. 1.9 BPM, 2600 FREE SPIN, 2700-2800 PSI, 2-3K WOB, 1/2 FPH, 9.7 ECD, NO STALLS. MILLED TO 9474'. 11:00 - 14:00 3.00 STWHIP P WEXIT MILL 3.80" HIGHSIDE WINDOW THRU 4-1/2" AND 7" CASING. 1.9 BPM, 2700 FREE SPIN, 2800-3000 PSI, 3K WOB, 10 DEG INCL, 9.8 ECD, NO STALLS. MILLED TO 9475'. 14:00 - 17:00 3.00 STWHIP P WEXIT MILL. 1.9 BPM, 2700 FREE SPIN, 2900-3000 PSI, 3.5K WOB, 10 DEG INCL, 9.8 ECD, MILLED TO 9476'. 17:00 - 19:00 2.00 STWHIP P WEXIT MILL. 1.9 BPM, 2700 FREE SPIN, 2900-3000 PSI, 3.5K WOB, 10 DEG INCL, 9.8 ECD, MILLED TO 9476.4 19:00 - 00:00 5.00 STWHIP P WEXIT MILL. 1.84 BPM, 2830 FREE SPIN, 2900-3000 PSI, 3-3.9K WOB, 10 DEG INCL, 9.83 ECD, APPEARS TO HAVE EXITED THE 7" AT 9477.3'. HOLD 630PSI WHP - 11.18PPG ECD. MILLED TO MIDNIGHT DEPTH OF 9477.6' Printed: 3/29/2010 11:46:OS AM TREE _ CMJ WELLHPAD = FMC ACTUATOR = BAKER C KB. ELEV - 83.75' BF. ELEV = 54.05' KOP = 2573' Max Angle = 88° @ 10149' Datum MD = 10050' Datum TV D = 8800' SS C SAFETY WELL ANGLE> 70° @ 10811' *** 4- Z ~O 3A 1/2" CHRTUBING & 2.3/8" CHROM E LNR (DEPTHS ARE ELM D) 3" GAP BETW OVERSHOT @ 9505° & LTP @ 9508' *** 2101' 9-5/8" TY PE H ES CEMENTER 2240' 4-1/2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS 20" CONDUCTOR, 91.5#, H-40, ID = 19.124" 110' 9-5/8" CSG, 40#, L-80 BTC, ID = 8.835" 3104' Minimum ID =1.920" @ 9315' 2-3/8" PUP JOINT 7" MARKERJOINT ST MD TVD DEV TYPE VLV LATCH PORT DATE 9 3264 3225 28 KBG2-1R DOME BK 16 04/01/10 8 4213 4020 33 KBG2-1 R DMY BK 0 05/30/08 7 5577 5168 34 KBG2-1R SO BK 20 04/01/10 6 6396 5843 33 KBG2-1R DMY BK 0 05/30/08 5 7217 6531 33 KBG2-1R DMY BK 0 02/07/10 4 7830 7044 34 KBG2-1R DMY BK 0 05/30/08 3 8440 7558 32 KBG2-1R DMY BK 0 02/07/10 2 8886 7936 28 KBG2-1R DMY BK 0 05/30/08 1 9205 8223 13 KBG2-1R DMY BK 0 02/07/10 4-1/2" HES X NIP, ID = 3.813" 9294' ~-~ 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 9310' -{4-1/2" BOT KB LTP, ID = 2.370" ESTIMATED TOP OF CEMENT -9320 9315' 2-7/8" SPACER PUP JOINT, ID = 1.920" '.TUBING PUNCH (03/01/10) 9320' - 9325' 9318' 4-1/2" HES X NIP, ID = 3.813" (BEHIND CT LNR) 9342' 3-1/2" BTT DEPLOY SLV, ID = 3.00" 3-1/2" X 2-3/8" STL XO PIN, ID = 1.92" ~ TOP OF WHIPSTOCK ~ 4-1/2" HES EZDRILL PKR (03/01/10) 4-1/2"TBG, 12.6#, 13CRVAMTOP, .0152 bpf, ID = 3.958" 7" CSG, 26#, L-80 BUTT-M, .0383 bpf, ID = 6.276" 9479' 9482' 9495' 9700' r~ PERFORATION SUMMARY REF LOG: SWS MGR/ CCL ON 03/25/10 ANGLE AT TOP PERF: 73° @ 9967' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1.56" 6 9967 - 10227 O 03/26/10 1.56" 6 10225 - 10475 O 03/26/10 1.56" 6 10525 - 10570 O 03/26/10 1.56" 6 10592 - 10702 O 03/26/10 1.56" 6 10735 - 10780 O 03/26/10 1.56" 6 10800 - 10810 O 03/26/10 1.56" 6 10833 - 10853 O 03/26/10 3.80" MILLOUT WINDOW (Z-03A) 9467 ' - 9477' PBTD ~~ 10859' ~ 2-3/8" LNR, 4.44#, 13CR-80 STL, .0039 bpf, ID = 1.992" ~ DATE REV BY COMMENTS DATE REV BY COMMENTS 09/28/97 JLM ORIGINAL COMPLETION 04/05/10 SMNV PJ FINAL DRLG CORRECTIONS 06/02/08 N3S RWO 03/27/10 NORDIC 2 CTD SIDTRACK (Z-03A) 03/27/10 PJC DRLG DRAFT CORRECTIONS 03/28/10 PJC PERF ANGLE CORRECTION 04/01/10 JLH/PJC GLV GO PRUDHOE BAY UNff WELL: Z-03A PERMff No:2100100 API No: 50-029-22787-01 SEC 19, T11 N, R12E, 976' FNL & 1427' FWL BP Exploration (Alaska) • • SEAN PARNELL, GOVERNOR ~T~r tailLa-7~A OII, talu~+s~+(irAs 333 W. 7th AVENUE, SUITE 100 COls-7CR~A~O" CO~-7-7IO~ ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)276-7542 Mr. John McMullen Production Engineer BP Exploration (Alaska), Inc. - P.O. Box 196612 Anchorage, Alaska 99519-6612 ~~,, Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z-03 Sundry Number: 310-009 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount Chair DATED this ~~ day of January, 2010 Encl. STATE OF ALASKA ~~.sLY,DD// /N/°.e~ ALASK~L AND GAS CONSERVATION COMMI~N .FO.e,G~~~i~ APPLICATION FOR SUNDRY APPROVAL ~,j,T> a1/QO/O 20 AAC 25.280 ~.. 2 X11 ~ 1. Type of Request: ® Abandon - - ®Plug for Redrill ^ Perforate New Pool ^ Repair Well ^ Change Approved Progl~rt~ ^ Suspend ^ Plug Perforations ^ Perforate ^ Pull Tubing ^ Time Extension ^ Operations Shutdown ^ Re-Enter Suspended Well ^ Stimulate ^ Alter Casing ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. - ®Development ^ Exploratory 197-131 3. Address: ^ Service ^ Stratigraphic 6. API Number. P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22787-00-00 - 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU Z-03 Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. Field /Pool(s): ADL 028262 ~ Prudhoe Bay Field / Prudhoe Bay Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10187 - 9210- 10101 9124 None 9502' Casin Len Size MD TVD Burst Colla Structural Conductor g ' 20" 14 47 Surface 3072' 9-5! " 3104' 30 5750 0 0 Intermediate 9670' 7" 9700' 8724' 7240 10 Production Liner 679' 4-1/2" 9 08' - 101 7' 8533' - 921 8430 7 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9844' - 9982' 8868' -9005' 4-1/2", 12.6# 13Cr 9505' Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV 9294' / 8320' MD (ft) and TVD (ft): 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: February 15, 2010 ^ Oil ^ Gas ^ WDSPL ^ GSTOR ®Abandoned 16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG ^ Plugged ^ SPLUG Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean McLaughlin, 564-4387 Printed Name John Mc ul n Title Engineering Team Leader ~ Prepared By NameJNumber y Phone 564-4711 Date ~ /~/ Terrie Hubble, 564-4628 Signature ^~'~ ' ~~`~ ` Commission Use-0nl Conditions of proval: NoF Commission so that a representative may witness Sundry Number. ! O ~~~ ^ Plug Integrity OP Test ^ Mechanigl Integrity Test ^ Location Clearance ,~ 3 Sao Pro ~eP st- Other: ~ Z Soo Psd flyh wl.~ l~s t ~) Subsequent Form Required: ~ U . ~/ Q APPROVED BY ~~ O D f d ate Approve By: COMMISSIONER THE COMMISSION Fo' 010~~0; ReJf~~12[~09 Submit In Duplicate • • To: Alaska Oil & Gas Conservation Commission From: Sean McLaughlin ~.Jp CTD Engineer Date: January, 12 2010 Re: Z-03 Sundry Approval Sundry approval is requested for well Z-03. A 2008 RWO to change out corroded tubing resulted in a piece of tailpipe with a plug stuck in it, stuck in liner at 9600 MD. No communication with reservoir. Also an obstruction in the Unique machine overshot at 9500 MD. This obstruction is thought to be a partially milled piece of the liner tieback sleeve, milled somewhat lengthwise, laying across the wellbore. No access below 9500' MD. REASON FOR SIDETRACK Sidetrack to regain access to the reservoir The proposed plan for Z-03A is to drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around April 10, 2010. The existing perforations will be isolated by the fish, cement, cement retainer, and the primary cement job. The sidetrack, Z-03A, will exit the 4.5" tubing tail and target zone 4. The following describes work planned and is submitted as an attachment to Form 10- 403. Aschematic diagram of the proposed sidetrack is attached for reference. CW~st wd~~~ %J I/~- f/Ss~~e, .~ Concw Pre-Rig Work: (scheduled to begin February 15, 2010) . Pro os~ol f~o/it~Atr ~'// ~'j~ ~~s«v~J ~ 1. 2. O S MIT-IA, -OA Run dummy whipstock drift to obstruction '~oF /oc~vN'oH, ~c G~ exifr~%-~ ~~'~ 3. S Dummy. GLV's ~~ ~ 1"~t//O 4. E Punch tubing C~ 9490' and 9320'. i 5. E Set cement retainer C«~ 9485'. 6. 7. C C Cement up 4-1/2" x 7" annulas Cleanout to top of the cement retainer with a 3.8" mill a--~ ~ 7- i b:~1. 8. S Dummy WS drift 9. E Set Baker 4.5" monobore WS w, HS(+/-30 degs) orientation @ 9470'. 10. O Set BPV 11.0 Test: PPPOT-T. Torqued LDS. 12. O PT MV, SV, WV 13.0 Blind and bleed lines, remove well house, level pad Rig Work: (scheduled to begin on April 10, 2010) 1. MIRU and test BOPE to 250 psi low and 3500 psi high. 2. Mill 3.8" window at 9470' and 10' of rathole. 3. Drill Intermediate: 4.125" OH, 232' (12 deg/100 planned) 4. Run 3-3/16" uncemented liner to cover up the Kingak 5. Drill Lateral: 3" OH, 1228' (18 deg/100 planned) with resistivity 6. Run 2-3/8" solid chrome liner leaving TOL at 9400' 7. Pump primary cement leaving TOC at 9400', 6 bbls of 15.8 ppg liner cmt planned 8. Cleanout liner and MGR/CCL log 9. Test liner lap to 2000 psi. 10. Perforate liner per asset instructions (500') 11. Set Liner Top Packer at 9395' 12. Freeze protect well, RDMO ~ 3~0~~~ Post Rig: 1. Re-install well house and attach production lines. 2. Pull BPV 3. Run GLV's 4. Test separator? (500' of perfs) Sean McLaughlin CTD Engineer 564-4387 CC: Well File Sondra StewmanlTerrie Hubble L D = FMC CTt,1ATOR = BAKER C K8. ELLa/ = 83.75' BF. ELEV = 54.05' KOP = 2573' Max Angle = 35° ~ 5780' Datwn MD= 9860' Dat~un ND = 8800' SS • Z-03 20" CONDUCTOR, 9t .511, H-40, ID = 19.124" 110' 9-5/8" CSG, 401F, L-80 BTC, ID = 8.835" 3104' Minimum ID ~ 3.813" ~ 2240' 4-112" HES X NIPPLE IT' MARKER JOINT I SAFETY ~S: "` 4-1/2' CFif~ME TtBtNG "" 3- GAP BETW HOT ~ 9505' S LTP ~ 9508"" 2101' 9-5/8" TY PE H ES COVBNTER 2240' 4-1 /2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT [SATE 9 3264 3225 28 KBG2-1 R DDME BK 16 0627108 8 4213 4020 33 KBG2-1 R DMY BK 0 05!30!08 7 5577 5168 33 KBG2-1 R DOME BK 16 0627/08 6 6396 5843 33 K8G2-1 R DRAY BK 0 05!30!08 5 7217 6531 33 KBG2-1 R DDME BK 16 0627/06 4 7830 7044 34 KBG2-1 R DMY BK 0 05/30/08 3 8440 7558 32 KBG2-1 R DOME BK 16 0627106 2 8886 7936 28 KBG2-1 R DMY BK 0 05/30108 1 9205 8223 13 KBG2-1 R SO BK 24 0627108 8273' H 4-112" HES X NIP, ID = 3.813" 9294' {-~ T' X 4-12" BKR S-3 PKR, ID = 3.875" 4-1/2" HES X NIP, ID = 3.813" 4-1/2" TBG, 12.6#, 13CR VAM TOP, .0152 bpf, ~ = 3.958° ITOP OF 4-112" LNR I 8$02' -1 FISH -OBSTRUCTION (02!27/09) 8506' 7" X 4112" lJnlA OVERSHOT 9508' T' X 5" ZXP LTP w f HMC LNR HGR, ID = 4.375" 8525' ~-~ 5" X 4-1 /2° XO, ID = 7" CSG, 28i, L-80 BUTT-M, .0383 bpf, ID = 8.278" PB7FORATION SUMMARY RED LOG: BHCS ON 09!24/97 ANGLEAT TOP PFRF: 4° ~ 9844' Note: Refer to Production ~ for hiatoricat perf data SIZE. SPF INTERVAL OpnlSgz DATE 2-12" 6 9844 - 9t~7 O 10V02/03 2-1/7' 6 9864-9882 O 1Q102/03 2-12" 6 9688 - 9~6 O 10102/03 2-1n' s ssoo - ssos o 1 aua2/o3 2-112" 8 9910 -9925 O 07/19!98 2-112" 4 9928 -9940 O 08106199 2-12" 8 9945 -9982 O 07/30f98 I PBTD I 41/2" LNR, 12.6N, 1-80 BUTT-M, H 10187' .0152 bpt, ~ = 3.958" gg03' H FISH - OLD TA IL PACE (05/28108) DATE REV BY COMMENTS DATE REV BY COMMENTS 08/29197 JLM ORIGINAL COMPLETION 03/05!09 RLM/SV OBSTRUCTION 02/27/09 OB102/~ N3S RWO 04/18108 TFAlfLH TBG CUT (04/07/O>g 10115/08 HB/JMD ORLG DRAFT CORRECT~NS 10!25108 PJC DRAWING CORRECTONS 01/03109 HB/PJC FINAL DRLG DRFT CORRECTIONS PRUDHOE BAY UNR WELL: Z-03 PERMR No: 1971310 API No: 50-029-22787-00 SEC 19, T11N, R1ZE, 978' FNL 3 142T FWL BP Exploration (Masks) LFfEA1a = FMC CTUATOR = BAKER C KB. ELEV = 83.75' BF. ELEV = 54.05' KOP= 2573' Max Angle = 35' ~ 5780' Datum MD = 9860' Datum Z ~O 3A SAFETY: '"' 4-1/2' CF~OME TIEING °' 3" GAP BETW RSHOT ~ 9505' 8~ LTP ~ 9508"" oroposed CTD sidetrac 2101' 9-5/8" TY PE H ES CEMENTER 2240' 41 /2" HES X NIP, ID = 3.813" ND = 8800' SS 20" CONDUCTOR, 91.5#, H-40, ID = 19.124" 110' 9-5/8" CSG, 40#, L-80 ETC, ID = 8.835" 3104' Minimum ID = 2.375" @ 9330' 4-112" KB LTP GAS LIFT MANDRELS 9 3264 3225 28 KBG2-1 R DOME BK 16 06!27/08 8 4213 4020 33 KBG2-1 R DMY BK 0 05/30/08 7 5577 5168 33 KBG2-1 R DOME BK 16 06/17/08 6 63.96 5843 33 KBG2-1 R DMY BK 0 05!30/08 5 7217 6531 33 KBG2-1 R DOME BK 16 06/27108 4 7830 7044 34 KBG2-1 R DMY BK 0 05/30/08 3 8440 7558 32 KBG2-1 R DOME BK 16 0627/08 2 8686 7936 28 KBG2-1 R DMY BK 0 05/30/08 1 9205 8223 13 KBG2-1 R SO BK 24 0627108 9273' I-{ 41 /2" HES X NIP, ID = 3.813" I Tubing Punches 9320' 9~4' T' X 4112" BKR S-3 PKR, ID = 3.875" 4-1 /2" KB LTP, ID = 2.375" 9395' 9318' ~ 41 /2" HES X NIP, ID = 3.813" 4-112" BOT Packer Whipstock 9470' 9400' Top of 2-3'S" chrome liner Cement Retainer 94$5' 9440' Top of 3-3/16" liner Tubing Punch 9490' 41/2" TBG, 12.6#, 13CR VAM TOP, 9495' .0152 bpf, ID = 3.958" 7° 9502' H FISH -OBSTRUCTION (02/27/09) 9505' 7" X 41 /2" UMI OVERSHOT 950$' 7" X 5" ZXP LTP w / HMC LNR HGR, ID = 4.375" 9528' S" X 4-1 /2" XO, ID = 3.958" 91 603' I~ FISH - OLD TA IL PIPE (05/28/08) 7" CSG, 26#, L-80 BUTT-M, .0383 bpf, ID = 6.276" 9700' PB~FORATION SUMMARY REF LOG: BRCS ON 09V24l97 ANGLE AT TOP PERF: 4° (~ 9844' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz []ATE 2-1 /7' 6 9844 -9857 O 10/02/03 2-1/7' 6 9864 - 9882 O 10/02103 2-117' 6 9888 -9896 O 10/02!03 2-12" 6 9900 - 9906 O 10/02/03 2-12" 8 9910 -9925 O 07/19198 2-117' 4 9928 -9940 O 08106/99 2-12" 8 9945 -9982 O 07/30/98 I PBTD I /2" LNR, 12.6#, L-80 BUTT-M~ H 10187' DATE DATE REV BY COMMENTS 09128/97 JLM ORIGINAL COMPLETION 03/05/09 RLMISV OBSTRUCTION (0227!09) 06102/08 N3S RWO 0427/09 MSE PROPOSED CTD SIDETRACK 04/18/08 TFAlTLH TBG CUT (04/07/08) 10/15/08 HBIJMD DRLG DRAFT CORRECTIONS 1025/OB PJC DRAWING CORRECTONS 01/03!09 HB/PJC FINAL DRLG DRFT CORRECTIONS 9702' 3-3/16" liner to TSGR I2-318" Chrome Liner to TD II PRUDHOE BAY UNIT WELL: Z-03A PERMIT No: API No: 50-029-22787-01 SEC 19, T11 N, R12~ 976' FNL & 1427' FWL BP Exploration (Alaska) ~ BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 August 14, 2009 ,.~~:,s~~..~'`~~~".~ :''_'~' t -. ~~ ~,~~J Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB Z-Pad Dear Mr. Maunder, ~ bp ~~~iE~~EL~' OCT 0 5 2009 ~las~C~ Dil F~ Gas Con~. Cor~ni~R~pn Anchora~e ~ ~~-~ 131 ~` ~'3 Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator ~ • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date Z-Pad 8/13/2009 Well Name PTD # API # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na ai Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009 Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7/24/2009 Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009 Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009 Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009 Z-06 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009 Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009 Z-08A 1931280 50029217870100 NA 0.2 NA 2.55 7/24/2009 Z-09A 2081410 50029219670100 NA 0.2 NA 1.70 7/24/2009 Z-10 1891160 50029219860000 NA 1.3 NA 11.10 7/24/2009 Z-11A 2050310 50029220530100 NA 0.2 NA 1.70 7/26/2009 z-12 1891020 soo2s21sn000o NA 1.2 NA 8.50 7/2s/20os Z-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009 Z-146 2060990 50029218440200 NA 0.2 NA 1.70 7/26/2009 Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009 Z-is 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009 Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009 Z-18 1890960 50029219710000 NA 0.2 NA 1.70 7/26/2009 Z-19A 2061050 50029222510100 NA 0.2 NA 1.70 7/26/2009 Z-20 1881000 500292t8590000 NA 0.2 NA 1.70 7/26/2009 Z-21A 2001010 50029219380100 NA 0.2 NA 1.70 7/23/2009 Z-226 1960350 50029220370200 NA 0.5 NA 5.10 7/23/2009 Z-23B 2041080 50029219500200 NA 0.3 NA 1.70 7l23l2009 Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009 Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009 Z-26A 2060790 50029219450t00 NA 0.3 NA 3.40 7/23/2009 Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009 Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25/2009 Z-29 1890650 50029219540000 NA 0.2 NA 1.70 7/25/2009 Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009 Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009 Z-326L1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009 Z-33A 1890050 50029218950100 NA 0.5 NA 3.40 8/8/2009 Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009 Z38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009 Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009 Z-46A 2052030 50029232800100 NA 1.7 NA 13.60 7/26/2009 Z-100 2031710 50029231820000 NA 5 NA 45.90 7/23/2009 Z-1o1 2001620 50029229780000 NA 1 NA 10.20 7/23/2009 Z-102 2070500 50Q29233530000 NA 1.5 NA 15.30 7/25/2009 Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2009 Z-108 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009 Z-i i 2 2071720 5002923380000o NA surface NA • STATE OF ALASKA ~OB ' AL~ OIL AND GAS CONSERVATION COMI~RSSION ~ ~ ~ REPORT OF SUNDRY WELL OPERATIONS A~BS~~ l.fli '~1 L~k ' rY `, t a` `Y, `JI~}i' ~~ 1. Operations Performed: ~'`.~_ ' ^ Abandon ®Repair Well . ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ~ c~~~5 ~~ i t ®P ll i ^ ^ ^ r s ng ,~9~.~\ ~ u Tub ng- Perforate New Pool Other Waiver ^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) lnc. ®Development ^ Exploratory 197-131 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22787-00-00 7. KB Elevation (ft): 83 75' - 9. Well Name and Number: PBU Z-03 ' 8. Property Designation: 10. Field /Pool(s): ADL 028262. Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 10187 ~ feet true vertical 9210 ~ feet Plugs (measured) None Effective depth: measured 10101 feet Junk (measured) 9603' p~ c~ ~`~ ~~~fc~ ~~ ~ true vertical 9124 feet ~~ Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 80' 80' 1490 470 Surface 3072' 9-5/8" 3104' 3080' 5750 3090 Intermediate 9670' 7" 9700' 8724' 7240 5410 Production Liner 679' 4-1/2" 9508' - 10187' 8533' - 9210' 8430 7500 ~~t~l~~IIVE~ AJG ~ ~; 2008 Perforation Depth MD (ft): 9844' - 9982' Perforation Depth TVD (ft): 8868' - 9005' 4-1/2", 12.6# 13Cr 9505' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 7" x 4-1/2" Baker'S-3' packer 9294' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Frank Roach, 564-4373 308-099 Printed Na a Sondra Stewman Title Drilling Technologist Si ature ~ Prepared By Name/Number: Phone 564-4750 Date ~~ "~ ~ ondra Stewman, 564-4750 Form 10-404 Revised 04/2006 ®~ I ~ ~ ~ ~ ~ ~~~ ~~~ ~ ~ z00~ Submit Original~my"/ "'- / [~ FREE = 4~-1 /16" CAMERON WELL'HFAD= 11"FMC ACTUATOR = BAKER KB. ELEV = 83.75' BF. ELEV...- 54.05' KOP = 2573' Max Angle = 35 @ 5780' Datum MD = 9860' Datum TV D = 8800' SS sYr ^ ~t-t[" i 9-5/8" CSG, 40#, L-80 BTC, ID = 8.681" 7" MA RKER JOINT Minimum ID = 3.813" @ 9723' 41/2" HES X NIPPLE I4-112" TBG, 12.6#, 13Cr-80 Vam Top, ,0152 bpf, I TOP OF4-1/2" LNR 17" CSG, 26#, L-80, .0383 bpf, ID = 6.276" I I 9495' I PERFORAT~N SUMMARY REF LOG: BHCS ON 09/24/97 ANGLE AT TOP PERF: 4 @ 9844' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 6 9844 - 9857 O 10/02/03 2-1/2" 6 9864 - 9882 O 10/02/03 2-1l2" 6 9888 - 9896 O 10/02/03 2-1/2" 6 9900 - 9906 O 10/02/03 2-1/2" 8 9910 - 9925 O 07/19/98 2-1/2" 4 9928 - 9940 O 08/06/99 2-1/2" 8 9945 - 9982 O 07/30/98 PBTD 10101' 4-1/2" LNR, 12.6#, L-80 MOD-BUTT, .0152 bpf, ID = 3.953" Z-03 S OTES: ***4-1 /2" CHROMETBG"*" 2239' ~ 4-1/2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 9 0264 3225 28 CAM DCK BEK 6/1/2008 H 4213 4020 33 CAM DMY SBK 6/1/2008 7 5577 5168 33 CAM DPv1`( SBK 61112008 6 6396 5843 33 CAM DMY SBK 6/1i'2008 5 7217 6531 33 CAtvt DMY SBK 6x1/2008 4 7830 7044 34 CAM DMY SBK 6(112008 3 8440 7558 32 CAM DMY SBK 6/112008 2 8886 7936 2H CAM DMY SBK 8/112008 1 9205 8223 13 CAM DMY SBK 8/1!2008 ~i~ 4-112" HES X NIP, ID = 3.813° 9294' 7" x 4-112" BKR S-3 PKR, ID = 3.875" 9318' 4-1(2" HES X NIP; ID = 3.813"' 9495' I--17"x4-1/2" UMI overshot 9603' (-j FISH: OLD TAIL PIPE {05I28t08) DATE REV BY COMMENTS DATE REV BY COMMENTS 09/28!97 JLM ORIGINAL COMPLETION 06/02/08 N3S RWO 09/14/03 JCM/TLP GLV C/O 06/05/08 /TLH CORRECTIONS 05/18/05 WRR/PJC ELMD CORRECTION 08/26/07 SV PERFORATIONS (10/02/03) 10/01/07 JPK/PJC DRAWING CORRECTIONS 01/17/08 JLJ/PJC SET PX PLUG (10/02/07) PRUDHOE BAY UNIT WELL: Z-03 PERMfr No: 1971310 API No: 50-029-22787-00 SEC 19, T11N, R12E, 976' SNL & 1427' EWL BP Exploration (Alaska) Wel I History • Well Date Summary Z-03 3/23/2008 ****W ELL S/I ON ARRIVAL**** (drift & tag) TAG PX PLUG ~ 9500' MD W/ 2.70" CENT & SAMPLE BAILER (NO SAMPLE RECOVERED) ****LEFT WELL S/I, TURNED OVER TO PAD-OP**** Z-03 3/26/2008 T/I/O=SSV/300/150, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS). Pre RWO prep. PPPOT-T: Stung into test void to check pressure (100 psi), bled to 0 psi. Pump through void until clean fluid returns were achieved. Pressured void to 5000 psi for 30 min test, lost 150 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. Functioned LDS (ET style), all moved freely with no sign of damaged pins. PPPOT-IC: Stung into test void to check pressure (300 psi), bled to 0 psi. Pump through void until clean fluid returns were achieved. Pressured void to 3500 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. Functioned LDS (ET style), all moved freely with no sign of damaged pins. Z-03 4/6/2008 ***W ELL SHUT IN ON ARRIVAL*** INITIAL T/I/O = 700/350/200 PSI CURRENTLY RIH W/ 2.5" JET CUTTER IN PROGRESS ***LOG CONTINUED ON 7 APRIL 08*** Z-03 4!7/2008 ***LOG CONTINUED FROM PREVIOUS DAY*** INITIAL T/I/O = 700/350/200 PSI RIH W/ 2.5" JET CUTTER TO CUT 3.5" TBG. TUBING CUT ~ 9,472'. FINAL T/I/O = 450/350/180 PSI ***WELL LEFT SHUT IN & TURNED OVER TO DSO*** Z-03 4/12/2008 T/I/0=650/260/320 Circ Out, CMIT TxIA PASSED to 3500 psi, MIT OA PASSED to 2000 psi (Pre RWO) Pumped down Tbg thru jet cut and up IA, taking returns to flowline with 5 bbl Meth, 500 bbls 1% KCL, 75 bbls diesel, U-tubed diesel TxIA. Pumped 7.2 bbls of diesel to reach test pressure for CMIT TxIA, T/IA lost 40/40 psi in first 15 min and 20/20 psi in second 15 min for a total loss of 60/60 psi. Pumped 4.8 bbis diesel to reach test pressure for MITOA, OA lost 100 psi in first 15 min and 20 psi in second 15 min for a total loss of 120 psi. Freeze protected Flowline with 5 bbls of neat. FWHP's= 80/80/60 Z-03 4/14/2008 T/I/0=280/280/30. SI. Bleed WHPs to 0 psi post-circ (pre-rig). GLT line ~ 1780 psi. Flow line (~ 280 psi. TBG FL near surface, IA FL (~ surface. OA FL near surface. Bled OAP from 30 psi to 0 psi in 15 minutes. Gas to fluid. Bled IAP &TBG pressure from 280 psi to 0 psi in 2 hours. Monitored 30 minutes. No increase in pressures. Final WHPs=O/VAC/0 Z-03 4/19/2008 T/I/0=220/310/0+. Temp=Sl. Bleed WHP's to 0 psi for BPV (RWO prep). A/LP=1820 psi, SI ~ companion. Bled TP &IAP simultaneously for 3 hrs, 45 mins.TP=O psi, IAP=30 psi. Tbg was fluid, then gas; IA was gas, then mixed. When SI, IAP would turn to gas, then FTS. Bled OAP to 0 psi in <1 min (gas). Monitored 15 mins (during RD). TP increased 10 psi, IAP increased 30 psi, OAP remained the same during monitor. **Note: Closed the laterals on both the A/L line & F/L. Tagged & notified FO. Bled both to 0 psi. A/L lateral was leaking slightly, so maintained an open bleed on A/L during the IAP bleed. Final T/I/0=10/60/0. Z-03 4/19/2008 T/I/0=0/0/0; Set 4-1/16" CIW H BPV thru tree pre-RWO; 1-2' ext. used, tagged ~ 96"; ***Complete*** (Best/Wortham) Z-03 4/19/2008 T/I/O = 15/100/0+. Temp = SI. Bleed WHP's to 0 psi for BPV verify serviced wing valve (RWO). F/L SI ~ grove (10psi). A/L SI ~ gate & lateral valves (420 psi). Bled TBG pressure to 0 psi in 30 min (all gas). SI, ~p~rt ~ monitored for 30 min while grease crew serviced A/L gate & lateral valves. No change in pressure. Bled IAP to 0 psi in 2hrs, 30 min (all gas). SI, monitored for 30 min. IAP increased to 0+ psi. **Valve crew installed BPV after bleed**. Final WHP's =BPV/0+/0+. Z-03 4/27/2008 Z-03 4/27/2008 Z-03 5/25/2008 Z-03 5/26/2008 Z-03 6/9/2008 Z-03 6/9/2008 T/I/0= 0/0/0. Pulled 4 1/8 CIW TWC ~ 84" 3x5' ext used. No problems. T/I/0=0/0/0. PULLED 4 1/8 CIW "H" BPV ~ 96" 1X2' EXT USED NO PROBLEMS. ***ASSIST NABOBS RIG 3S*** MAKE TWO LIB RUNS (2.10", 1.75") TO 3 1/2" X-NIPPLE THAT FELL TO -9600' SLM, IMPRESSIONS OF COLLAR. ***CONTINUED ON 05-26-08 WSR**** ***RIG JOB CONT. FROM 5/25/08*** RAN 2.50" P. BAILER SEVERAL TIMES TO 6900' SLM. RECOVERED 3 OTS. TOTAL OF METAL SHAVINGS. ***RDMO AS PER RIG REP*** Assorted sizes ,rod and fishneck assemblys T/I/O =VAC/0/0 Pull 4 1/16" CIW H BPV Post Rig. Print Date: 6/30/2008 • • BP EXPLORATION Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Event Name: WORKOVER Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 3S Date From - To Hours Task Code NPT 4/26/2008 101:00 - 08:30 I 7.50 I MOB I P 08:30 - 13:00 4.50 MOB P 13:00 - 22:30 9.50 RIGU P 22:30 - 00:00 1.50 WHSUR P 4/27/2008 00:00 - 01:30 1.50 WHSUR P 01:30 - 03:00 1.50 WHSUR P 03:00 - 07:00 4.00 KILL P 07:00 - 08:30 I 1.501 WHSUR I P 08:30 - 10:30 2.00 WHSUR P 10:30 - 14:00 3.50 WHSUR P 14:00 - 18:00 4.00 WHSUR P 18:00 - 20:00 2.00 WHSUR P 20:00 - 21:00 21:00 - 23:00 1.001 WHSURIP 2.001 PULL I P 23:00 - 00:00 1.00 PULL P 4/28/2008 00:00 - 06:00 6.00 PULL P 06:00 - 09:00 3.001 PULL P 09:00 - 10:00 1.00 PULL P 10:00 - 11:30 1.501 PULL P Start: 4/24/2008 Rig Release: 6/2/2008 Rig Number: Phase PRE PRE PRE Page 1 of 20 ~ Spud Date: 9/1/1997 End: 6/2/2008 Description of Operations Rig released from MPF-94 ~ 01:00 hours. Rig down rig modules and prep for move. Wait 1 hour on part for PEAK truck (fuel pump). Depart MPF pad. Notified AOGCC w/ 24 hour notice for BOPE testing (Chuck Scheve) MIRU on Z-03. Spot carrier, pipe shed and pit modules. Connect all lines. (Raise and scope derrick at 21:00 hrs). Install burms and handrails,Tigertank and hard line. Rig DECOMP Rig up hard line and install second annulus valve to Tree. Take on seawater. DECOMP Steam and test hard line to 1,500 psi to closed choke and 500 psi from choke to Tiger tank. DECOMP PUMU lubricator Well techs II BPV D WHP's: Tbg/IA/OA-10/100/Opsi. DECOMP PJSM with vac truck drivers and crew. Pump down the tubing with returns through choke to Tiger tank, 425 bbls of 130 deg F seawater at 3 1/2 BPM, 850 psi, IA pressure to 1400 psi with gas and crude in returns. Circulate until clean returns. DECOMP Flow check well. Tbg and IA stable (no flow_ no vac . Dry rod DECOMP ND tree. Inspect hanger threads- ok. 5 turns w/ 4 1/2" NSCT to MU to hanger. Chuck Scheve waived AOGCC's right to witness BOPE testing. DECOMP NU DSA, PU BOPE from cradle, NU DECOMP Function test BOPE, fill stack with water and heat annular element. BOPE test to 250 psi low, 3500 psi high with 3 1/2" test joint. DECOMP Perform pre-tour checks, load and strap 3-1/2" DP in pipe shed, PU control line spooler to rig floor. Change out power tongs to 4-1/2", PU Otis shooting nipple. DECOMP PU/MU lubricator, Well techs pull TWC, LD lubricator and shooting nipple. DECOMP PU/MU landing joint with safety valve, screw into hanger, FMC rep BOLDS. Observe well. Held PJSM with FMC, Schlumberger and Rig Team. Pulled tubing hanger to floor, 65K PUW. BO/LD landing joint and tubing hanger. DECOMP POH LD 3-1/2" 9.2# TDS, L-80, tubing completion assembly with dual control line. DECOMP Continue to POH LD 3-1/2", 9.2#,TDS, L-80, tubing conpletion assembly, with continuios hole fill. Steam on Well Head with OA open and hard lined to Tiger tank. Recovered 71 SS bands. 150 joints (292 and 1-cut joint total) LD at 06:00 hrs. DECOMP Continue POH with 3 1/2" completion. On joint # 195 as POH, 6 to 8 each holes in pipe the size of silver dollars. , osition of bad tubin 'oint would hav Continuous hole fill. Joints 218 - 223 sever) corroded, holes the length of joint, split in some places. Last of Tbg recovered - 26'- 6" of joint # 243 DECOMP 3 GLM's, 49 full joints, 1 cut joint, - 5' stub, of tubing left in hole. -1890" of tubing left in hole. Secure well, clean and clear rig floor. Estimated Top of Fish -7751. DECOMP Strip and cut drilling line. Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Page 2 of 20 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: Z ell Name: Z e: Name: From - To -03 -03 WORKOVER NABORS ALASK NABORS 3S Hours Task DRI Code LING NPT Start I Rig Rig Phase Spud Date: 9/1/1997 : 4/24/2008 End: 6/2/2008 Release: 6/2/2008 Number: Description of Operations 4/28/2008 11:30 - 13:30 2.00 PULL P DECOMP PU rathole and install. PUMU kelly. 13:30 - 16:30 3.00 WHSUR P DECOMP PUMU 1 ea 4 3/4" DC w/ 4 3/4" Bumper sub, XO, and packoff pulling tool. Mark DC, strap in hole and engage 9 5/8" x 7" ackoffs. PU and pull packoffs free with 5K overpull. PUMU new packoffs, RIH and seat in Csg spool. RILDS. Test packoffs to 3500 psi - ok. 16:30 - 17:00 0.50 FISH P DECOMP BOLD packoff running tool and bumper sub. MU 6.875" ID wear ring and install. LD running tool and DC. EPOCH calibrate block height, rotary speed and torque. 17:00 - 17:30 0.50 FISH P DECOMP EPOCH calibrate block height, look to repair rotary torque and speed, but had to order parts. 17:30 - 20:00 2.50 FISH P DECOMP PU/MU Baker fishino spear BHA: Spear, xo sub, DC, xor sub, xo sub, bumper sub, Bowen oil jar, pump out sub, DC = 120.27'. Held PJSM with Baker fisherman and Rig Team, perform pre-tour checks. 20:00 - 00:00 4.00 FISH P DECOMP PU and rabbit 3-1/2", 13.3#, DP, RIH 90 joints at 00:00 hrs. (-2913') 4/29/2008 00:00 - 04:00 4.00 FISH P DECOMP Continue PU and rabbit 3-1/2" 13.3# DP and RIH with tubing spear from 2913' to joint 200 (6314'). 04:00 - 08:30 4.50 FISH P DECOMP PJSM. PU Kelly remove elevators and bells, torque up connections. Pressure test to 3500 psi. Set back Kelly. Had failure on upper Kelly Cock. Had to heat and work valve to get pressure test. 08:30 - 10:30 2.00 FISH P DECOMP Continue to RIH picking up 3 1/2" DP from pipe shed, from Joint #200 to #243. 10:30 - 11:00 0.50 FISH P DECOMP PUMU Kelly. Establish fishing parameters. PUW of 115K, SOW of 85K with Kelly, 1 BPM / 200 psi. RIH and engage Fish. PU 10 ft 'ars tri and Fish fall off. Slack off re-en Fish. PU w/ 135K PUW (20K extra weight). 11:00 - 14:00 3.00 FISH P DECOMP Circulate surface to surface with 8.5 ppg seawater at 2 BPM / ', 1,300 psi through the Choke to the Pits. Gas in returns from downhole circulated through the Gas Buster. No crude seen it returns at an oint, circulate unto clean, as tree returns on surface. MW in = 8.5 ppg , MW out = 8.6 ppg. 14:00 - 15:30 1.50 FISH P DECOMP Set back Kelly, POH with Fish from 7,751' to 6,920' and stand back in Derrick, with continuous hole fill. 15:30 - 17:00 1.50 FISH P DECOMP Pump 100 bbls seawater down the Tubing taking returns to the Tiger tank at 2 BPM / 1,400 psi to finish off loading the truck and fill the Pits with clean seawater. 17:00 - 19:00 2.00 FISH P DECOMP Continue to POH with Fish from 6,920' to 5,735' with continuous hole fill. 19:00 - 19:30 0.50 FISH P DECOMP Rig service of EPOCH (Rig watch monitoring system) rotary torque. 19:30 - 21:30 2.00 FISH P DECOMP Continue to POH from 5,735' to 120' with continuous hole fill. 21:30 - 23:30 2.00 FISH P DECOMP BO/LD Baker fishing tools (ITCO Spear Assembly) and change to 3-1/2" power tongs and handling tools. 23:30 - 00:00 0.50 FISH P DECOMP POH LD the Fish: 3-1/2", 9.2#, TDS, L-80, Tubing completion from Joint #244 to Joint #254. The 5' of Tobin Stum from the art in the Tobin that was ex ected on to of GLM #3 was not there onl the Pu Joint above the GLM. 4/30/2008 00:00 - 02:00 2.00 FISH P DECOMP Continue POH LD the Fish: 3-1/2", 9.2#, TDS, L-80, Tubing completion from Joint# 254 to Joint# 293 and 3 GLMs, Pup, X Nipple, and the cut was in the 10' Pup Joint below the X-Nipple, rnmea: aiswzuun `J:ZJ:00 HM • • BP EXPLORATION Page 3 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABORS 3S Rig Number: Date !From - To Hours Task Code NPT Phase Description of Operations __ _ 4/30/2008 00:00 - 02:00 2.00 FISH P DECOMP length of cut = 8.67'. No external pitting or holes observt 02:00 - 03:00 1.00 FISH P 03:00 - 04:00 1.00 FISH P 04:00 - 12:00 8.00 FISH P 12:00 - 13:00 1.00 FISH P 13:00 - 13:30 0.50 FISH P 13:30 - 15:00 1.50 FISH P 15:00 - 18:00 3.00 FISH P 18:00 - 21:00 ~ 3.00 ~ FISH ~ N 21:00 - 00:00 ~ 3.00 ~ FISH ~ P 5/1/2008 100:00 - 01:00 I 1.001 FISH I P 01:00 - 03:30 I 2.501 FISH I P 03:30 - 06:00 2.50 FISH P 06:00 - 07:00 1.00 FISH P 07:00 - 09:00 I 2.001 FISH I P DECOMP Clean and clear rig floor of handling tools and prep to PU new BHA. DECOMP PU/MU Packer Mill Assembl : 6-1/8" Mill, 2 ea Bootbasket, Bit sub, Bumper sub, Oil jar, Pump out sub, 9 ea 4-3/4" DC. Overall Length = 279.30'. DECOMP PU 7 ea 4-3/4" DC and RIH with Packer Mill assembly on 3-1/2" DP from derrick to 15 stands in hole at 06:00 hrs. DECOMP Tag at 9,435' with 10K down. PUMU Kelly. PUW = 150K , SOW = 112K. Break circulation at a rate of 2 bpm / 200 psi and RIH with the Kelly. Wash the Kelly down completely 30'. It appears that we to ed 'unk in the well ossibl from corr Tubin and were able to wash down throw hit Set back Kelly. DECOMP PU Joint #294 of DP and PUMU Kelly. Break circulation at a rate of 3 bpm / 425 psi and wash down through the junk. Engage Rotary Table at 60 RPM with RW = 120K and 900 ft-Ibs of torque. Solid tag at 20' in on the Kelly = 9,455'. DECOMP EPOCH rep on location to calibrate the new sensors for Rotary RPM and Rotary Torque prior to milling on the Packer. DECOMP Mill on the Packer per Baker Fishing rep's recommendations. PUW = 150K ,SOW = 112K , RW = 127K , 2,000 ft-Ibs of torque , 90 RPM, 15K weight on mill , 3 bpm / 500 psi. Depth of mill at 9456'. DECOMP Rig crew responded to smoke coming from the Draw works, a hydraulic hose ruptured under Draw works resulting in a leak. ADW HSE Safety Advisor and RWO Operations Superintendent were notified. x5700 was notifed. GPB SRT arrived, inspected area and performed clean up. They indicated that the incident would be classified a leak due to 100% containment. DECOMP Continue milling on the Packer per Baker Fishing rep's recommendations. PUW = 150K ,SOW = 112K , RW = 127K , 2,000 ft-Ibs of torque , 90 RPM, 15K weight on mill , 3 bpm / 500 psi. Depth of mill at 9457'. DECOMP Continue millin on the Packer per Baker Fishing rep's recommendations. PUW = 150K ,SOW = 112K , RW = 127K , 2,000 ft-Ibs of torque , 90 RPM, 15K weight on mill , 3 bpm / 500 psi. Depth of mill at 9,457'. DECOMP Took 8 bbl it ain due to as mi ration after rubb rs ille ate. Pumped 320 bbls down the Tubing taking returns through the Choke to the Pits, 3 BPM at 450 psi. Shut down to observe well - no flow. DECOMP Continue to mill on packer at 9,457'. DECOMP At a de th of 9,458' the mill ushed throw h the last of the Packer. RIH with the remainder of the Kelly. PU a single Joint of DP and push the bod of the Packer to the to of the 4-1/2" Liner to a final de th of 9 510' 3SMD. The well is static with no losses noted. DECOMP Circulate bottoms up with clean seawater to ensure we have a clean wellbore at a rate of 3 bpm / 400 psi. Pumped a total of Printed: 6/30/2006 9:25:56 AM • • BP EXPLORATION Page 4 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABOBS 3S Rig Number: Date ~ From - To ~ Hours Task 'ail Code ' NPT Phase I Description of Operations 5/1/2008 07:00 - 09:00 2.00 FISH P DECOMP 260 bbls. No losses observed during circulation. 09:00 - 14:30 5.50 FISH P DECOMP POOH with BHA #2 standing back DP in the Derrick. Maintaining continuous hole fill while POOH. 14:30 - 15:00 0.50 FISH P DECOMP On surface with BHA #2. Break off a I There is about 50% wear -good indication. Inspect and empty out two bootbaskets. They were full of fine metal cuttings and shavings. 15:00 - 16:00 1.00 WHSUR P DECOMP Pull 6-7/8" Wear Ring. Set Test Plug. RU Test Equipment. 16:00 - 17:00 1.00 BOPSU P DECOMP Pressure test the Annular with 3-1/2" Test Joint to 250 / 3,500 psi due to having closed it while circulating gas bubble out after • milling Packer. 17:00 - 18:00 1.00 FISH P DECOMP MU BHA #3 as follows: 3-1/4" ITCO Spear• XO, bumper sub, oil jar, pump out sub, 8 ea 4-3/4" DC. OAL = 270.13'. 18:00 - 18:30 0.50 FISH P DECOMP Rig service and perform pre-tour checks. 18:30 - 00:00 5.50 FISH P DECOMP RIH with Packer spear assembly on 3-1/2" DP from derrick to 8,250' 5/2/2008 00:00 - 01:30 1.50 FISH P DECOMP Continue RIH with Packer spear assembly on 3-1/2" DP from derrick, from 8,250'to 9,125'. 01:30 - 03:00 1.50 FISH P DECOMP PU 2 additional Joints of DP and the Kelly. PUW = 142K and SOW = 120K. Taaaed top of Fish at 9,510', enoage Fish with, 15K down on no- o no dra noted when ickin u with i h. 03:00 - 09:30 6.50 FISH P DECOMP POH with BHA #3, standing back 3-1/2" DP in derrick, with continuos hole fill. 09:30 - 10:00 0.50 FISH P DECOMP On surface with BHA #3 - no Fish. Inspect the Grapple and no indication of it ever attempting to grab onto anything, still in the set position. Consult with Anchorage Engineering and Baker Fishing Shop and decision made to go in with an extended Spear Assembly and Grapple to grab the Tubing in the Tailpipe beneath the Packer. Break out and lay down the Spear Components. 10:00 - 12:00 2.00 FISH N DECOMP Wait on Baker Fishing Components to arrive on location. Monitor the well and obtain static loss rate -well is static, no ', visual loss of fluid. 12:00 - 12:30 0.50 FISH P DECOMP New Spear and Grapple arrives on location. PUMU BHA #4 as follows: Bowen ITCO pear with 3.001" rapple, Bumper Sub, Oil Jar, Pump Out Sub, 8 ea Drill Collars. OAL = 277.97'. 12:30 - 17:30 5.00 FISH P DECOMP RIH with BHA #4 on 3-1/2" DP from the Derrick and PU 2 joints DP from pipe shed to 9,497'. 17:30 - 21:00 3.50 FISH P DECOMP Ta to of Fish at 9 51 'PUW = 145K and SOW = 115, PU Kelly, work and rotate pipe to enter Fish with Mud pump, 26PM at 640 PSI, slid into Fish 10' with pump off and set 20K down on Fish. Observed 15K over pull, drop ball and rod and attempted to shear the Pump out sub at 3,000 PSI with out success. 21:00 - 00:00 3.00 FISH P DECOMP Set back and blow down Kelly. Observed over pull decreasing as first 5 stands were pulled. POH with BHA #4 slow with continuous hole fill, pipe coming wet, 20 stands out at 00:00 hrs, depth of 7,600'. 5/3/2008 00:00 - 07:30 7.50 FISH P DECOMP Continue POH with fishin assembl (BHA #4) coming wet, standing 3-1/2" DP in Derrick from 7,600 to surface with continuous hole fill. 07:30 - 08:00 0.50 FISH P DECOMP On surface with BHA #4. No Fish, No Jo .The Grapple shows indication of biting on something and is not in proper Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Operations Summary Report Page 5 of 20 Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours i Task ~ Code i NPT ~ Phase i Description of Operations 5/3/2008 07:30 - 08:00 0.50 FISH P DECOMP condition to re-run in the hole. The Pump Out Sub was completely packed off with sand/fill/dope and this prevented the dart from ever getting on seat. Clean out the Pump Out Sub. Confer with Anchorage Engineer and decision made to re-run the same BHA back in the hole. 08:00 - 10:00 2.00 FISH N DECOMP Wait on new 3.001" Grapple to arrive from Baker Fishing. Service the Rig while waiting on tools to arrive. 10:00 - 11:00 1.00 FISH P DECOMP PUMU BHA #5 with the same com onents as BHA #4. Clear the ID of the Spear Assembly due to being completely packed off with sand/fill/dope. The first stand of Drill Collars was also packed off. 11:00 - 17:00 6.00 FISH P DECOMP TIH with BHA #5 on 3-1/2" DP from the Derrick. 17:00 - 00:00 7.00 FISH P DECOMP In with 148 stands (296 Jts) of 3-1/2" DP. PUMU Kelly. PUW = 150K ,SOW = 110K. Break circulation at a rate of 3.5 bpm / 1,700 psi and pump a full DP volume plus before entering the Fish, pumped a total of 70 bbls. Wash down to top of Fish and ~ Kell 9 510' with no slide into the Fish at 13' in on the problems. Continue washing down slowly to attempt and clear any fill/sand inside the Tubing. Swallow 8' (21' in on the Kelly)- and begin POH slowly. Latched onto the Fish but not free. Jar multiple times to attempt to free ourselves. Max straight pull utilized 225K. At 21:00 hrs, confer with Anchorage Engineers and decision was made to increase to 235K max pull and suspend Jarring at 00:00 hrs. 5/4/2008 00:00 - 00:30 0.50 FISH P DECOMP Disen a from th Fish 1 ' with B k r r 00:30 - 07:30 7.00 FISH P DECOMP Inspect Derrick after Jarring. Blow down and set back Kelly. POH with BHA #5 standing back 3-1/2" DP in Derrick. 07:30 - 08:00 0.50 FISH P DECOMP On surface with BHA #5. Break out and lay down components. 08:00 - 08:30 0.50 WHSUR P DECOMP Pull Wear Ring. Set Test Plug. 08:30 - 13:00 4.50 BOPSU P DECOMP Pressure test BOPE to 250 / 3,500 psi per BP / AOGCC Regulations. The state's right to witness the test was waived by John Crisp at 07:30 hrs on 5/4/2008. The test was witnessed by Wellsite Leader, Toolpusher and Driller. Confer with Anchorage Engineer and the decision made to run back in with the Packer Milling Assembly and finish milling the bottom of the Packer and the XO below it to leave 3-1/2" Tubing Tailpipe looking up. 13:00 - 13:30 0.50 WHSUR P DECOMP Pull Test Plug. Set 6-7/8" 1D Wear Ring. 13:30 - 15:00 1.50 BOPSU P DECOMP Pressure test Upper Kelly Valve - OK. 15:00 - 16:00 1.00 FISH P DECOMP PUMU BHA #6 components the same as BHA #2 -Packer 16:00 - 17:00 1.00 FISH P DECOMP Cut 105' and slip drilling line. 17:00 - 18:00 1.00 FISH P DECOMP TIH with BHA #6 on 3-1/2" DP from the Derrick, 30 stands in hole. 18:00 - 18:30 0.50 FISH P DECOMP Rig service and perform per-tour checks. 18:30 - 22:30 4.00 FISH P DECOMP Continue RIH with BHA #6 on 3-1/2" DP from Derrick, 148 stands in hole. 22:30 - 00:00 1.50 FISH P DECOMP MU Kell and to at 9 ', set back Kelly and LD 1 joint DP. 5/5/2008 00:00 - 00:30 0.50 FISH P DECOMP PU 20', 3-1/2" DP Pup. MU Kelly. 00:30 - 04:00 3.50 FISH P DECOMP Mill on the Packer per Baker Fishing rep's recommendations. PUW = 155K ,SOW = 110K , RW = 127K , 6,000 - 12,000 ft-Ibs of torque , 90 RPM, 10K weight on mill , 3 bpm / 450 psi. Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Operations Summary Report Page 6 of 20 Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABOBS 3S Rig Number: Date j', From - To I', Hours Task Code ~ NPT 5/5/2008 104:00 - 10:30 6.50 FISH P 10:30 - 12:30 I 2.001 FISH I P 12:30 - 14:00 1.50 FISH P 14:00 - 15:30 1.50 FISH P 15:30 - 20:30 5.00 FISH P 20:30 - 00:00 3.50 FISH P 5/6/2008 100:00 - 03:30 3.501 FISH P 03:30 - 04:00 0.50 FISH P 04:00 - 09:00 5.00 FISH P 09:00 - 16:00 I 7.001 FISH I P 16:00 - 17:00 ~ 1.00 ~ FISH ~ P 17:00 - 18:00 1.00 FISH P 18:00 - 21:00 3.00 FISH N 21:00 - 00:00 I 3.001 FISH I P 5/7/2008 100:00 - 08:30 I 8.501 FISH I P 08:30 - 09:00 0.50 FISH P 09:00 - 10:00 1.00 FISH P Phase Description of Operations DECOMP Set back the Kelly and LD 20'. POH from 9,504' with BHA #6 standing back 3-1/2" DP in Derrick. 22 stands out at 05:30 hrs. DECOMP On surface with BHA #6. Break out and la down BHA components with Baker Fishing rep. Inspect mill -about 75% even wear. PUMU BHA #7 the same as BHA #5 with added Intensifier -Spear Assembly with 3.001" Grapple. DECOMP TIH with BHA #7 on 3-1/2" DP from the Derrick. DECOMP Hold weekly safety meeting with crew on location due to inclement weather and remote distance from Milne Point Base Camp. DECOMP Resume TIH with BHA #7 on 3-1/2" DP from the Derrick. DECOMP In with 147 stands and a single (295 Jts) of 3-1/2" DP. PUMU Kelly and 20' DP pup ,PUW = 150K ,SOW = 110K. Break circulation at a rate of 2.5 bpm / 1,100 psi and pump a full DP volume plus before entering the Fish, pumped a total of 70 bbls. Wash down to top of Fish and slide into the Fish 2', attempts to wash deeper failed and drill string became plugged, begin POH slowly. Latched onto the Fish but not free. Jar multiple times to attempt to free ourselves. Max straight pull utilized 250K. Jarring up at 9,508.' DECOMP Continue to Jar on Fish at 9,508'. Jar up at 270K, max straight pull of 300K. Came free at 03:00 hrs. DECOMP Set back Kelly, LD 20' DP pup and 1 joint DP. DECOMP Circulate and condition well at 2-1/2 bpm / 260 psi. Inspect Derrick after Jarring operation. Gas breaking out of returns on surface with bottoms up. Slow pump rate to safely circulate until gas break out subsides. Continue circulating on bottom at a rate of 2 bpm / 200 psi until discussion with Anchorage on local Phase 2, Level 3 conditions. Service the Rig and thaw out frozen lines. DECOMP POOH with BHA #7 standing back DP in the Derrick maintaining continuous hole fill with seawater. DECOMP On surface with BHA #7. Recovered the bottom 1.5' feet of Packer, the 2' long 4-1/2" x 3-1/2" XO and the collar of the 10' pup below the XO. The Collar OD = 4.0" and the threads are still in the inside of the Collar. We parted right at the conn lion. BOLD BHA #7 components. Confer with Anchorage Engineering and decision made to wash over the remaining 40' of tailpipe down to the top of the 4-1/2" Liner. DECOMP Clear and clean Rig Floor. DECOMP Wait on fishing tools to be delivered. Still in Phase 2 Level 3 weather conditions. DECOMP Load 5 3/4" Wash pipe in pipeshed. Strap and P/U BHA #8. MM Wash Over Shoe, 2 jts of 5 3/4" Wash pipe, Drive sub, XO, 2 Boot baskets, XO, Bumper Sub, Oil Jar, Pump Out Sub, 8 DC's. Total BHA Length = 347.07' DECOMP RIH with Washpipe Assembly on 3-1/2" DP from derrick from 347'. Tag the top of the Fish 9.5' in on Joint #295 (147 stands and asingle) = 9,513'. DECOMP PUMU Kelly. PUW = 155K ,SOW = 110K. Re-tag top of Fish at same de th of 9 513'. DECOMP Check Rotary Brake prior to starting the cleanout operation. Work on the Brake and ensure in proper condition. WAIT Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Page 7 of 20 Operations. Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours Task li Code ! NPT Phase ',I Description of Operations 5/7/2008 10:00 - 12:30 2.50 FISH P DECOMP Attempt to get on Fish but it appears the outside of it is packed with fill. Circulate the long way to attempt and clean it up at a rate of 3 bpm / 500 psi. Rotate the Kelly with 60 RPM 7,500 ft-Ibs of free torque and RW = 128K. Observe small amounts of sand in returns after 200 bbls away. 12:30 - 13:30 1.00 FISH P DECOMP Line up to reverse circulate and wash down on top of the Fish. Break reverse circulation at a rate of 3 bpm / 900 psi with about 5K weight on shoe -not making any hole. 13:30 - 16:00 2.50 FISH P DECOMP PU off of the Fish and line up to go the long way. Break circulation at a rate of 3 bpm / 425 psi with 10K weight on shoe. Engage Rotary Table at 75 RPM with 10,000 ft-Ibs of torque. Wash down on top of Fish and continue RIH with the Kelly. Getting small amounts of sand and fine metal across the Shakers. Made it 17' in on the Kelly to a depth of 9,520' and encountered hard bottom unable to make more hole. PU slightly off bottom. 16:00 - 18:00 2.00 FISH P DECOMP Pump hi-vis sweep around the long way at a rate of 3.5 bpm / 600 psi. Fine sand and metal cuttings back with sweep. 18:00 - 21:00 3.00 FISH P DECOMP Reverse circulate a hi-vis sweep around 3.5 bpm with 1,650 psi. Sweep brought up fine sands with metal cuttings. P/U off of fish and shut pump down. S/O over fish with out problems 2 times. 21:00 - 21:30 0.50 FISH P DECOMP B/O and blowdown kelly. Stand back kelly. 21:30 - 00:00 2.50 FISH P DECOMP POOH with BHA #8, standing back 3-1/2" DP in the derrick. Maintain continuous hole fill. 5/8/2008 00:00 - 03:30 3.50 FISH C DECOMP POOH with BHA #8 standing back 3-1/2" DP in the derrick. Maintain continuous hole fill. 03:30 - 05:00 1.50 FISH C DECOMP Stand back 4-3/4" DC's, UD Washpipe Assembly. Recovered a small iece of fish in Washover Shoe. Empty boot baskets, recovered 2 gallons of metal cuttings and fine sand. 75% metal cuttings and 25% fine sand. 05:00 - 06:00 1.00 FISH C DECOMP M/U BHA #9 as follows: Overshot, Extension, Top Sub, Bumper Sub, Oil Jar, Pump Out Sub, (8) Drill Collars, Intensifier. OAL = 283.37'. 06:00 - 06:30 0.50 FISH C DECOMP Pre-tour checks and service the Rig. 06:30 - 12:00 5.50 FISH C DECOMP TIH with BHA #9 on 3-1/2" DP from the Derrick. In with 147 stands of DP from the Derrick. PU 2 singles to make stand #148. PUMU Kelly. PUW = 144K ,SOW = 115K. 12:00 - 13:30 1.50 FISH C DECOMP Mix and circulate 1 drum of Safe Lube into the seawater system to aid in reducing friction at a rate of 3 bpm / 350 psi. 13:30 - 14:00 0.50 FISH C DECOMP RIH with Kelly and tag the Fish at 9,503'. Work the Overshot down 5' to swallow completely. Jar on the Fish and it came free on the 21st hit at 250K. 14:00 - 15:30 1.50 FISH C DECOMP Circulate bottoms up at a rate of 3 bpm / 350 psi. No gas or crude seen in the returns on surface. 15:30 - 22:30 7.00 FISH C DECOMP POOH with BHA #9 standing back 3-1/2" DP in the Derrick. Maintain continuous hole fill while POOH. 22:30 - 23:30 1.00 FISH C DECOMP Stand back 4-3/4" DC's in derrick and break down BHA. 23:30 - 00:00 0.50 FISH C DECOMP Break out and UD fish. Recovered 10.02' of 3-1/2" tubing. Fishy came a art at the connection with the collar on bottom of the 5/9/2008 00:00 - 00:30 0.50 FISH C DECOMP Break Out and UD Bowen Overshot. 00:30 - 02:00 1.50 FISH C DECOMP M/U BHA #10, 2-3/6" Muleshoe Jt, XO, Stabilizer/Swedge, Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Event Name: WORKOVER Contractor Name: NABORS ALASKA DRILLING I Rig Name: NABORS 3S Date From - To Hours Task Code NPT 5/9/2008 00:30 - 02:00 02:00 - 07:00 07:00 - 07:30 07:30 - 09:30 09:30 - 12:00 12:00 - 12:30 12:30 - 14:30 14:30 - 21:30 21:30 - 22:30 Page 8 of 20 Spud Date: 9/1 /1997 Start: 4/24/2008 End: 6/2/2008 Rig Release: 6/2/2008 Rig Number: Phase Description of Operations 1.50 FISH C DECOMP Bumper Sub, Oil Jar, Pump Out Sub, 8 4-3/4" DC's. total BHA Length = 289.21' 5.00 FISH C DECOMP RIH with BHA #10, Tailpipe Clean Out Assembly on 3-1/2" DP from derrick. 0.50 FISH C DECOMP PUMU Kelly. PUW = 143K ,SOW = 120K. Break circulation at a rate of 2 bpm / 160 psi and attempt to make hole without rotation - no Joy. 2.00 FISH C DECOMP Pull off and engage Rotary Table at 20 RPM and 2,000 ft-Ibs of torque. RW = 125K. Tag the top of the Fish at 5' in on the Kelly = 9.513'. Wash down with 1-2K weight on Muleshoe and circulating at 3 bpm / 350 psi. Work the KeNy down to 23' in = 2.50 FISH C DECOMP Pull out of the hole and observe drag coming out, highest overpull seen was 35K overpull to 180K. Pull off of the Fish. RIH with circulation at a rate of 3 bpm / 375 psi and no rotation to same depth we cleaned out. Pull off of the Fish and reverse circulate a hi-vis sweep at a rate of 4 bpm / 1,000 psi surface to surface. Lots of real fine sand seen before the sweep arrived on surface and also suspended in the sweep. 0.50 FISH C DECOMP Pre-tour checks and service the Rig with new crew on the Slope today. 2.00 FISH C DECOMP Attempt to wash back down to the same depth achieved with no success. Work down to 13' in on the Kelly several times and bottom out, it appears that we may be beside the Fish. 7.00 FISH C DECOMP Blow down and set back Kelly. POOH with BHA #10 standing back 3-1/2" DP in the Derrick with continuous hole fill. 1.00 FISH C DECOMP Standback DC's and B/O and L/D BHA #10, Clean Out Assembly. The muleshoe on the 2-3/8" tubing stinger was comoletly bent over inside the end of the stinger and a 1-1/2" x 1-1/2" niece of the milled packer slip was wedged inside the 22:30 - 23:30 1.00 FISH P DECOMP M/U BHA #11. Overshot Assembly. Overshot, Overshot Extension, Top Sub, Bumper Sub, Oil Jar, Pump Out Sub, 8 4-3/4" DC's, Intensifier. Total BHA Length = 283.37' 23:30 - 00:00 0.50 FISH P DECOMP RIH with BHA #11, Overshot Assembly on 3-1/2" DP from derrick. 5/10/2008 00:00 - 05:00 5.00 FISH P DECOMP RIH with BHA #11, Overshot Assembly on 3-1/2" DP from derrick to 9,502' 05:00 - 05:30 0.50 FISH P DECOMP P/U Kelly and establish paramenters 143K up and 118K down. Pump at 1/2 bpm with 50 psi and wash over top of fish at 9 513', pressured up to 400 psi. Shut down pump and bleed off pressure. P/U to 225K and hit jars, pull to 250K, repeat one time. P/U to 250K and hit jars, pull to 275K, Repeat one time. Fish came loose. Pump through string at 1/2 bpm with 50 psi pressure. Slack off and tag with no increase in pump pressure and no excess pull when picking up string. 05:30 - 07:30 2.00 FISH P DECOMP Circulate bottoms up at 4 bpm with 500 psi pump pressure. Pumped a total of 320 bbls of seawater. No gas or crude seen 07:30 - 11:30 4.00 FISH P DECOMP Blow down set back Kelly. POOH with BHA #11 standing back DP in the Derrick maintaining continuous hole fill with seawater. 40 stands out at 09:30 hrs. Stop at 11:30 hrs to calibrate the rig monitoring system with EPOCH rep. Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Page 9 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABORS 3S Rig Number: Date From - To Hours ' Task Code NPT Phase Description of Operations 5/10/2008 11:30 - 14:00 2.50 FISH N DECOMP Work on Rotary RPM, pump pressure and flow in /flow out monitoring systems with EPOCH rep. Replaced old flowline paddle measuring device with a new one and calibrated it. 14:00 - 17:00 3.00 FISH P DECOMP Resume POOH with BHA #11 standing back DP in the Derrick with continuous hole fill. 17:00 - 19:30 2.50 FISH P DECOMP On surface with BHA #11. Recovered a 4.33' Fish of 3-1/2" Tubin .This should leave a roximatel 6' of Tubin lookin up past the top of the 4-1/2" Liner Top. The Overshot Assembly was packed off with fine sand making it difficult to remove the Fish from the Overshot. The Fish had evidence of the Washover Assembly (BHA #8) being over it. Clear and clean Rig floor. 19:30 - 21:00 1.50 FISH P DECOMP BH Overshot Assembly. Overshot, Overshot Extension, Top Sub, Bumper Sub, Oil Jar, Pump Out Sub, 8 4-3/4" DC's, Intensifier. Total BHA Length = 283.37'. Removed packoff from Mill Control. 21:00 - 22:00 1.00 FISH P DECOMP RIH with BHA #12, Overshot Assembly on 3-1/2" DP from derrick to 3,386, 22:00 - 23:30 1.50 FISH P DECOMP Slip and Cut 125' of drilling line. Inspect brakes on drawworks. 23:30 - 00:00 0.50 FISH P DECOMP Continue to RIH with BHA #12, Overshot Assembly on 3-1/2" DP from derrick. 5/11/2008 00:00 - 02:00 2.00 FISH P DECOMP Continue to RIH with BHA #12, Overshot Assembly on 3-1/2" DP from derrick to 7,105'. 02:00 - 04:30 2.50 FISH P DECOMP M/U TIW and Dart Valves, Pressure up to 100 psi on the annulus and perform stripping drill. Stripped in 3 stands of DP maintaining an additional 100 psi working range. Bleed off pressure and POOH 3 stands. B/O and L/D TIW and Dart Valves. Blow down Kill, and Choke lines, Blow down Choke Manifold. 04:30 - 06:00 1.50 FISH P DECOMP Continue to RIH with BHA #12, Overshot Assembly on 3-1/2" DP from derrick. In with 148 stands (296 Jts) of DP. 06:00 - 06:30 0.50 FISH P DECOMP Pre-tour checks and service the Rig. 06:30 - 07:00 0.50 FISH P DECOMP PUMU Kelly. Establish parameters: PUW = 143K ,SOW = 118K , 3 bpm / 350 psi , 30 RPM , 4,500 ft-Ibs free torque , RW = 128K. 07:00 - 08:30 1.50 FISH P DECOMP Wash down and attempt to latch the Fish: Bottom out with a hard bottom at 17' in on the Kell = 9 520' (same depth the Washover Assembly bottomed out). Try several times to latch the Fish - no Joy. No drag or noticeable change in PUW observed. Park the BHA at 14' in on the Kelly. 08:30 - 10:00 1.50 FISH P DECOMP Reverse circulate surface to surface at a rate of 3.5 bpm / 575 psi to attempt and remove more sand from the wellbore, No ma'or sand seen in returns. Attem t to RIH and latch Fish a ain - no Jo . 10:00 - 16:00 6.00 FISH P DECOMP Blow down and set back Kelly. POOH with BHA #12 standing back DP in the Derrick with continous hole fill. 35 stands out at 11:30 hrs. 75 stands out at 13:00 hrs. 16:00 - 17:00 1.00 FISH P DECOMP On surface with BHA #12, no Fish. Break out and lay down components. The bottom of the Cut Lip Guide was flattened indicating we were on the 4-1/2" Liner Top. Give AOGCC rep Jeff Jones a 2-3 hour call out for upcoming BOPE test. Confer with Anchorage Engineering on plan forward. Decision made to re-run the 2-3/8" Muleshoe Cleanout Assembly and have Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Page 10 of 20 Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To 5/11/2008 16:00 - 17:00 17:00 - 18:00 18:00 - 00:00 5/12/2008 00:00 - 00:30 00:30 - 02:00 02:00 - 08:30 08:30 - 09:00 09:00 - 10:00 10:00 - 10:30 10:30 - 11:00 11:00 - 14:30 14:30 - 15:30 15:30 - 19:00 19:00 - 21:00 21:00 - 23:30 23:30 - 00:00 5/13/2008 100:00 - 00:30 Z-03 Z-03 Spud Date: 9/1 /1997 WORKOVER Start: 4/24/2008 End: 6/2/2008 NABOBS ALASKA DRILLING I Rig Release: 6/2/2008 NABOBS 3S Rig Number:. Hours Task 'i Code ~ NPT i Phase II Description of Operations ! 1.00 -_ FISH P -_ DECOMP Little Red assist with the cleanout run. 1.00 WHSUR P DECOMP Pull 6-7/8" ID Wear Ring and set Test Plug. 6.00 BOPSU P DECOMP M/U test assembl and test BOPE to 250 psi low and 3,500 psi high. Tested Blinds, Annular Preventer, VBR's, HCR and Manual Choke and Kill Valves, Choke Manifold, Floor Valves, Upper Kelly and Lower Kelly Valves. 4-1/2" and 3-1/2" Test joints were used. Each test was held for 5 minutes on the Chart. Performed Koomey drawdown test. No Failures. Test was witnessed by BP WSL, Nabors Toolpusher and Jeff Jones with the AOGCC. All Gas Monitors were tested with the tests witnessed by Jeff Jones of the AOGCC. There were no Failures. 0.50 WHSUR P DECOMP Pull test plug and install 6-7/8" ID Wear Bushing 1.50 CLEAN P DECOMP R/U and M/U BHA #13, cleanout Assembly. 1 Jt of 2-3/8" tbg w/ Muleshoe, XO, 5-3/4" Swedge-Stablizer, Bumper Sub, Oil Jar, Pump out Sub, 8 4-3/4" DC's. Total BHA Length = 299.96' 6.50 CLEAN P DECOMP RIH with BHA #13 on 3-1/2" DP from the Derrick. LD Joint #296 and pick up a 20' pup joint of DP. 0.50 CLEAN P DECOMP PU and MU the Kelly. 1.00 CLEAN P DECOMP Work on unplugging the cement line prior to starting the operation. RU Little Red to the cement line. 0.50 CLEAN P DECOMP Pre-job safety meeting with Nabors Crew, Little Red, CH2M Hill and Baker Fishing on the cleanout operation. 0.50 CLEAN P DECOMP Pressure test with Little Red to 3,500 psi - OK. 3.50 CLEAN P DECOMP Establish paramters: PUW = 143K ,SOW = 118K. Break circulation at a rate of 3 bpm / 350 psi. Tag at 13' in on the Kell = 9 520'. POOH and engage the Rotary Table at 25 RPM with 4,000 ft-Ibs of torque and RW = 128K. RIH and tag at 10' in on the Kelly. Notice pump pressure increase to 500 psi. Wash down with 1-2K weight on muleshoe. Wash down to 25' in on the Kelly with rotation = 9.533,. POOH and park the BHA at 23' in on the Kelly. 1.00 CLEAN P DECOMP Mix and pump a 30 bbl hi-vis sweep the long way and chase with both the Rig Pump and Little Red in tandem at a rate of 6.5 bpm / 2,000 psi. Lots of tine sand a_nd rust from the ID of the Pi a in the returns. 3.50 CLEAN P DECOMP Resume washing and rotating down with the same parameters. RIH with the Kelly to 28' in on the Kelly = 9,536'. Pump Pressure increased to 650 psi at 3-1/2 bpm. Picked up and had increased dra to 175K. 2.00 CLEAN P DECOMP Mix and pumped 30 bbl hi-vis sweep the long way and chased with both Rig Pump and Little Red in tandem at 7 bpm with 2,500 psi pump pressure. Sweep brought up fine sand and pipe scale. 2.50 CLEAN P DECOMP Line up and reverse circulate a 30 bbl hi-vis sweep with both the Rig Pump and Little Red in tandem at 4.5 bpm with 3,200 psi pump pressure. Sweep brought back lots of fine sand and i e scale. 0.50 CLEAN P DECOMP Establish parameters and resume washing. SOW = 118K, PUW = 143K, RW = 129K, 25 rpm with 3,000 fUlbs torque and 340 psi pump pressure at 3 bpm 0.50 CLEAN P DECOMP Wash and Ream. At 9,533' noticed increase in pump pressure to 600 psi at 3 bpm. Washed down to 9,537'. DOK 29'. Work Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Page 11 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours Task Code' NPT Phase Description of Operations 5/13/2008 00:00 - 00:30 0.50 CLEAN P DECOMP weight on muleshoe up to 5K and 4K torque at 25 rpm. Would ~o longer drill off. Picked up and saw pressure drop 4' off bottom. When slacking off we saw pressure increase at 9,533' again without taking weight. Slacked off to 9,537' and started taking weight. 00:30 - 01:30 1.00 CLEAN P DECOMP Blow down and stand back Kelly, Slowdown and R/D Little Red Pump Truck and lines. 01:30 - 02:30 1.00 CLEAN P DECOMP Hold Safety Meeting with Crew. 02:30 - 08:30 6.00 CLEAN P DECOMP POOH with BHA #13, standing back 3-1/2" DP in Derrick. 08:30 - 09:30 1.00 CLEAN P DECOMP On surface with BHA #13 -break out and lay down components. The 2-3/8" Muleshoe was in very poor shape. There are markings /gouges on it indicating that we still have some metal downhole (slip segments?). The joint was almost cut in half 8.5' u from the bottom. The joint had good indication that we entered the 3-1/2" tubing tailpipe a total of 17.5' in which would put us at 9,537 - 9,538'. Confer with Anchorage Engineering on plan forward and get tools heading to location from the Baker Fishing Shop. 09:30 - 11:30 2.00 CLEAN P DECOMP PUMU BHA #14. 4-1/2" 5 Blade Mill, XO, XO, 6 1/8" Stabilizer sub, DP sub, 2 ea 4-3/4" Boot baskets, bit sub, bumper sub, bowen oil jar, pump out sub, and 8 ea 4-11/16" DC's. OAL-289.57' 11:30 - 17:30 6.00 CLEAN P DECOMP RIH w/ BHA #14 on 3 1/2" DP from Derrick to 9,508' 17:30 - 18:00 0.50 CLEAN P DECOMP Pick up Kelly. 18:00 - 21:30 3.50 CLEAN P DECOMP Suck out and Clean pits and take on 2% KCL water with 2# Barazan into pit 2. 21:30 - 22:00 0.50 CLEAN P DECOMP Pump 2% KCI with 2# Barazan down DP and Annulus to cover BHA. 22:00 - 00:00 2.00 CLEAN P DECOMP Establish parameters, PUW = 142K, SOW, 120K, RotW = 132K, 50 rpm with 4,000 ft/Ibs torque, 440 psi pump pressure at 3.5 bpm. Wash down and start milling while displacing. T~ TOL at 9 520'. Mill at 50 rpm with 5,000 - 7,000 ft/Ibs of torque, WOM = 3,000 - 6,000#, 420 psi pump pressure at 3 bpm. 5/14/2008 00:00 - 03:00 3.00 CLEAN P DECOMP Mill at 50 rpm with 5,000 - 8,000 ft/Ibs of torque, WOM = 3,000 - 6,000#, 420 psi pump pressure at 3 bpm. Mill to 9,525'. Pump pressure incresed to 550 psi and torque increased to 9,000 ft/Ibs as XO no/go'd out on Liner Top. 03:00 - 05:30 2.50 CLEAN P DECOMP Circulate hole clean 05:30 - 06:00 0.50 CLEAN P DECOMP Break out and blow down Kelly, Stand Kelly back. 06:00 - 07:30 1.50 CLEAN P DECOMP Crew change. POH 5 stands pulling wet. Load 1" ball and pump to seat and shear PO sub with 2100 psi. 07:30 - 13:00 5.50 CLEAN P DECOMP POH standing back 3 1/2" DP. Still pulling wet as 2% KCL w/ 2# Biozan is very viscous. 45 stands OOH ~ 09:30. 90 Stands OOH C~ 11:00. At DC's ~ 13:00. Continuous hole fill with no losses as POH 13:00 - 14:00 1.00 CLEAN P DECOMP Stand back 8 ea 4-11/16" DC's, break out PO sub to re-dress. Empty boot baskets and recover -3/4 gallon of metal cuttings from tubing stub. 14:00 - 15:00 1.00 CLEAN P DECOMP PU single joint of 2-3/8" DP with cut-rite muleshoe, xo, 6 1/8" stabilizer, DP sub, 2 ea boot baskets, bit sub, bumper sub, bowen oil jars, PO sub (re-dressed) and 8 4-11/16" DC. BHA OAL - 314.16' 15:00 - 16:00 1.00 CLEAN P DECOMP Clean and clear rig foor. RIH w/ 10 stands of 3 1/2" DP. Printed: 6/30/2008 9:25:56 AM • BP EXPLORATION Operations Summary Report Page 12 of 20 Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours Task Code NPT Phase ' Description of Operations 5/14/2008 16:00 - 18:00 2.00 CLEAN P 18:00 - 18:30 0.50 CLEAN P 18:30 - 22:30 4.00 CLEAN P 22:30 - 23:00 0.50 CLEAN P 23:00 - 00:00 1.00 CLEAN P 5/15/2008 100:00 - 05:00 I 5.00 I CLEAN I P 05:00 - 06:00 1.00 CLEAN P 06:00 - 13:00 7.00 CLEAN P 13:00 - 14:30 1.50 CLEAN P 14:30 - 15:30 1.00 CLEAN P 15:30 - 17:30 2.00 CLEAN P 17:30 - 23:30 23:30 - 00:00 5/16/2008 100:00 - 01:00 01:00 - 03:00 03:00 - 03:30 03:30 - 06:00 6.00 I CLEAN I P DECOMP Stripping in the hole drill. Strip in 2 stands of DP, POH with 2 stands stripped in and B/O and L/D Dart and TIW valves. Blow down choke manifold and choke line. DECOMP Service Rig, Inspect derrick for ice build up. DECOMP RIH with BHA #15 on 3-1/2" DP from derrick to 9,511' DECOMP Pick up and make up Kelly. DECOMP Establish parameters, PUW = 151 K, SOW = 110K, RotW 128K, 30 rpm with 6,500 ft/Ibs of torque, 470 psi at 2 bpm. Wash down, took 3k down weight at 9,525' .Tagged at 9,531', wash and ream with 3-5K weight on muleshoe. 60 rpm with 7-8K ft/Ibs of torque. DECOMP Wash down with 3-5K weight on muleshoe. 60 rpm with 8,500 ft/Ibs of torque. Pumping 2.5 bpm with 550 psi. Pump pressure increased to 950 psi at 9,537', P/U and wash back down at 9,540' pressured up to 2,600 psi, shut off pump and pressure remained on string. Bled off pressure and Picked up on string and dragged up 6' at 60K overpull, jars hit at 50K overpull. String weight came back to 150K. Picked up out of 3-1/2" tail i e to 9,515' and attem ted to circulate. Pressured up to 240 psi and shut off pump. Pressure maintained at 240 psi. Bleed off pressure. DECOMP Drop ball and shear out circulating sub. Sheared at 2,350 psi. Break out and stand back Kelly DECOMP Derrick inspection to clear ice. POH w/ BHA #15 (pulling wet). 11:30 @ 105 stands OOH and pipe start pulling dry. DECOMP Stand back 8 ea DC's. Break out PO sub, jars, bumper sub, 2 boot baskets. Recovered -1 quart of small metal shavings. PU 2-3/8" wash pipe. Did not recover pron Missin mill face -1 inch on bottom where it was worn off. Inside of wash pipe, on the very end, grooved to match fishing neck of prong. Inside tattle tale ~ 2' bent over. Outside of wash pipe junk cut BADLY, (almost completely in two). Outside of wash pipe junk cut along 15' + from end of joint. DECOMP Clean and clear rig floor. Call town and discuss. DECOMP PUMU 1.875" spiral grapple with extension on 2- 1/8" DC, xo, 6 1/8" stabilizer, sub, 2 boot baskets, xo, bumper sub, bowen oil jar, PO sub, 8 4-3/4" DC's. OAL - 320.38' DECOMP RIH with BHA #16 on 3-1/2" DP from derrick to 9,515'. Break 0.50 1.00 CLEAN CLEAN P P DECOMP DECOMP circulation at 3,423' and 6,514'. P/U Kelly and establish parameters. PUW = 151 K, SOW = 112K, 1 bpm with 550 psi. Wash over fish with 1 bpm and 550 psi, tag at 9,539' and set down 25K pressure went up to 1,120 psi, shut o pump, P U to 175 and bleed down jars, P/U to 200K pulled up 5-6' and came free, Pump at 1 bpm with 550 psi. Slack off to 9,540' set down 35K, pressured up to 1,350 psi, P/U to 175K bleed jars, P/U to 200 K pulled up 5-6' with drag then came free. Pump at 1 bpm and the pressure was 550 psi. Made repeated attempts did not see increase in ressure or an excess dra . 2.00 CLEAN P DECOMP Drop ball and shear out circulation sub, sheared at 2,300 psi. Circulate bottoms up at 4 bpm with 650 psi. 0.50 CLEAN P DECOMP B/O and blowdown Kelly. Standback Kelly. 2.50 CLEAN P DECOMP POOH standing back 3-1/2" DP. Maintain continuous hole fill. Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Page 13 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABORS 3S Rig Number: Date from - To Hours Task Code NPT Phase Description of Operations 5/16/2008 06:00 - 10:00 4.00 CLEAN P DECOMP POH wet until stand #105. 10:00 - 11:30 1.50 CLEAN P DECOMP Stand back 4-11/16" DC's. Boot baskets empty, break off overshot for 1.875" spiral grapple. Muleshoe junk cut and tip bent. Heavy scarring on muleshoe and tacks grooved 18" up 11:30 - 12:00 I 0.501 CLEAN 1 P 12:00 - 13:00 I 1.001 CLEAN I P 13:00 - 15:30 2.50 CLEAN P 15:30 - 17:30 2.00 CLEAN P 17:30 - 21:30 4.00 CLEAN P 21:30 - 00:00 2.50 CLEAN P 5/17/2008 100:00 - 06:00 I 6.00 I CLEAN I P 06:00 - 08:00 2.00 ~ CLEAN ~ P 08:00 - 09:00 I 1.00 I CLEAN I P 09:00 - 15:00 6.00 ~ CLEAN ~ P 15:00 - 16:00 I 1.001 CLEAN I P 16:00 - 17:00 I 1.001 CLEAN I P 17:00 - 18:00 1.00 CLEAN P 18:00 - 19:00 1.00 CLEAN N 19:00 - 19:30 0.50 CLEAN P 19:30 - 20:00 0.50 CLEAN P 20:00 - 00:00 4.00 CLEAN P 5/18/2008 00:00 - 00:30 0.50 CLEAN P 00:30 - 10:30 10.00 CLEAN P Nubbing torn off grapple control, and spiral grapple missing (left in hole). Grapple housing swelled for -8" from bottom of MS. DECOMP Clean and clear rig floor. (Very slimy from 2% KCL w/ 2# Biozan pulling wet.) DECOMP PUMU BHA #17: 4-1/4" - 5 blade mill, xo, 1 jt of 3-1/8" DC, xo, 6 1/8" stabilizer, DP sub, 2 boot baskets, bit sub, bumper sub, Bowen oil jar, PO sub, 8 ea 4-11/16" DC's. OAL - 317.15' DECOMP RIH w/ BHA #17. DECOMP 85 stands in the hole. Strip and cut drill line. DECOMP Continue RIH w/ miliing BHA to 9,514' DECOMP P/U Kelly and establish parameters. PUW =150K, SOW = 110K, RotW = 126K, 60 rpm at 7K ft.lbs of torque, 3 bpm at 620 psi pump pressure. Wash down and tag at 9,524'. Mill 3-1/2" tail i e assembl from 9 524' to 9 527', Weight on mill 2-6K, 60 rpm with 9K ft/Ibs of torque, 3 bpm at 640 psi pump pressure. DECOMP Mill 3-1/2" tailpipe assembly from 9,527'. Weight on mill 4-6K, 60 rpm with 9K fUlbs of torque, 3 bpm at 670 psi pump pressure. DECOMP Mill to 9535'. Pump 30 Bbl of Flo-Vis sweep (50 cp vis), displace w/ 150 Bbls C~? 4 BPM, 9560 psi while rotating and reciprocating DP. Pump 2nd 30 Bbl Flo-Vis sweep and displace OOH C~ 4 BPM 950 psi while working pipe. Circulate 500 Bbls total. DECOMP POH above liner, drop ball-rod, pump 16 Bbls C«~ 1-1/2 BPM to ball on seat, pressure to 1900 psi to shear PO sub. Break out, blow down, and stand back Kelly. Lay down 10' pup joint. DECOMP POH w/ BHA #17. Pulling wet. Contact AOGCC w/ 24 hour notice for BOPE testing. State's right to witness waived by Chuck Scheve. DECOMP Stand back 8 ea 4-11/16" DC's. Break out mill. No wear on bottom guide mill (indicates did not get on prong), upper mill worn (~ 3.5" diameter to steel below cut-rite. Recovered 1 quart of metal shavings in boot baskets. DECOMP PUMU BHA #18: 4-1/4" OD / 2" ID rotary burn shoe, xo, 4-1/4" sabilizer, 1 ea 3-1/8" DC, xo, 6-1/8" stabilizer, DP sub, 2 ea boot baskets, bit sub, bumper sub, bowen oil jar, PO sub, and 8 ea 4-11/16" DC. OAL - 321.70' DECOMP RIH w/ BHA #18 on 3 1/2" DP from Derrick. RIH 25 stands, Secure Well DECOMP Relief crew caught behind Doyon 14 rig move. Swap crews out around Doyon 14 while rig was stopped on the Spine Road. DECOMP Hold safety meeting with crew coming on tour. DECOMP Service crown, blocks, kelly, drawworks and rotary table. DECOMP RIH with BHA #18 on 3-1/2" DP from Derrick. DECOMP RIH with BHA #18 on 3-1/2" DP from Derrick to 9,519' DECOMP M/U Kelly and establish parameters. PUW = 148K, SOW = Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Page 14 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 5/18/2008 00:30 - 10:30 10.00 CLEAN P DECOMP 110K, ROTW = 126K, 3 bpm at 660 psi, 60 rpm at 8K torque off bottom. Wash down and taa at 9.533'. Mill from 9.533'. WOM 2-6K, 60 rpm with 9-10K torque, 3 bpm with 730 psi pump pressure. MillMill t~9535'. Work mill for 5 hours varying torque, pump rate and weight on bit. Unable to mill further. 10:30 - 14:30 4.00 CLEAN P DECOMP Pump 30 Bbl of 50 cp Flo-Vis sweep and displace C~ 4-1/4" BPM, 900 psi. Displace wellbore w/ Seawater. Clean pits and load with SW. 14:30 - 21:30 7.00 CLEAN P DECOMP Stand back kelly. Load Pit #1. POH standing back 3-1/2" DP in derrick. 21:30 - 22:30 1.00 CLEAN P DECOMP Stand back DC's and UD BHA #18, Burn Shoe Assembly. Slight wear around outside edge of Burn Shoe and slight wear on face of Burn Shoe. Recovered approximately 1/2 gallon of metal cuttings in junk basket. 22:30 - 23:00 0.50 BOPSU P DECOMP Pull Wear Bushing. 23:00 - 00:00 1.00 BOPSU P DECOMP Install test plug, M/U test assemblies and fill BOPE with water. 5/19/2008 00:00 - 06:00 6.00 BOPSU P DECOMP Test BOPE, Choke Manifold, Kelly valves, and floor valves to 250 psi low and 3,500 psi high. Hold each test for 5 minutes on the chart. AOGCC witness of test was waived by Chuck Scheve. Test was witnessed by the BP WSL and Nabors Toolpusher. Used 3-1/2" and 4-1/2" test joints. Perform drawdown test on Koomey. 06:00 - 08:30 2.50 BOPSU P DECOMP Pull test plug, install wear ring. PU Kelly and test 250 / 3500 psi. Upper and lower kelly cock. Drain kelly, stand back. Drain stack. 08:30 - 11:00 2.50 BOPSU P DECOMP ND riser, NU shooting flange. Spot SLB unit, load SLB equipment in pipe shed and to rig floor. PJSM with all crews. 11:00 - 13:30 2.50 EVAL P OTHCMP RU SLB pessure control equipment: Lubricator, PI sub, WL BOP's, lubricator, and packoffs. Test to 500 psi. No leaks. 13:30 - 15:00 1.50 EVAL P OTHCMP RIH w/ USIT logging tool. Tool tight through wear ring. Work tool, then RIH to 400'. Attempt to engage sonex tool. Tool malfunction. POH 15:00 - 16:00 1.00 EVAL P OTHCMP Break out logging tool bottom section. (sonex component). Change out same. make up to WL BOPE, RIH for USIT log from top of liner to surface. 16:00 - 22:00 6.00 EVAL P OTHCMP RIH w/ USIT logging tool. Log up from 9,475' to 205' 22:00 - 23:00 1.00 EVAL P OTHCMP UD USIT tool. 23:00 - 00:00 1.00 EVAL P OTHCMP P/U SFRT logging tool. 5/20/2008 00:00 - 00:30 0.50 EVAL P OTHCMP P/U SFRT logging tool. 00:30 - 04:00 3.50 EVAL N OTHCMP Attempt to test SFRT logging tool. Attemp to troubleshoot logging tool. Unable to get tool to work. UD SFRT tool and work on in trailer. P/U SFRT and test. Positive test. 04:00 - 10:30 6.50 EVAL P OTHCMP RIH with SFRT logging tool. Log across the Kuparuk 7550' - 7390'. Lo s show oor cement across Ku aruk resevoir. 10:30 - 13:00 2.50 EVAL P OTHCMP PJSM. Rig Down SLB tools and pressure control equipment from rig floor. 13:00 - 14:30 1.50 EVAL P OTHCMP ND shooting flange. NU pitcher nipple and air boot. 14:30 - 16:00 1.50 FISH P DECOMP PUMU 4-1/4" 5 bladed junk mill, XO, XO, 4-1/4" stabilizer, 1 ea 3-1/8" DC, 6-1/8"" stabilizer, DP sub, 2 ea boot baskets, bit sub, bumper sub, Bowen oil jars, PO sub, 8 ea 4-11/16" DC's. OAL - 318.03' 16:00 - 18:00 2.00 FISH P DECOMP RIH w/ BHA #19. to 40 stands in hole. Printetl: 6/30/2008 9:25:58 AM ~ • BP EXPLORATION Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Event Name: WORKOVER Contractor Name: NABOBS ALASKA DRILLING I Rig Name: NABOBS 3S ' Date From - To Hours ~, Task Code NPT 5/20/2008 18:00 - 18:30 0.50 FISH P 18:30 - 22:00 3.50 FISH P 22:00 - 00:00 2.00 FISH P 5/21/2008 100:00 - 02:30 I 2.501 FISH I P 02:30 - 06:00 3.501 FISH P 06:00 - 12:30 I 6.501 FISH I P 12:30 - 14:00 I 1.501 FISH I P 14:00 - 18:00 4.00 FISH P 18:00 - 19:00 1.00 FISH P 19:00 - 20:00 1.00 FISH P 20:00 - 00:00 I 4.001 FISH I P 5/22/2008 00:00 - 01:00 1.00 FISH N 01:00 - 05:00 4.00 FISH P 05:00 - 06:00 1.00 FISH P 06:00 - 14:00 8.00 FISH P 14:00 - 15:30 I 1.501 FISH I P 15:30 - 16:30 I 1.001 FISH I P 16:30 - 17:30 1.00 FISH P 17:30 - 18:00 0.50 FISH P 18:00 - 23:00 5.00 FISH P 23:00 - 00:00 1.00 FISH P 5/23/2008 ~ 00:00 - 01:30 ~ 1.50 ~ FISH ~ P 01:30 - 03:00 ~ 1.50 ~ FISH ~ P Start: 4/24/2008 Rig Release: 6/2/2008 Rig Number: Page 15 of 20 ~ Spud Date: 9/1 /1997 End: 6/2/2008 Phase Description of Operations DECOMP Service rig and perform per-tour checks. DECOMP Continue RIH, pick up Kelly and a 10' pup to 9,510'. DECOMP Transfer seawater from pits to Tiger tank and load pits with 8.5PPG, 2% KCL. Held PJSM with Vac truck drivers and Rig crew. DECOMP Displace well, 320 bbls 8.5 PPG, 2% KCL with 2 Ibs Biozan / Safe tube, at 4 BPM / 660 PSI, taking returns to Tiger tank. Blow down lines. DECOMP Milling on fill at 9,530'. Weight on mill 4-6K, 70 rpm with 9K -11 K fUlbs of torque, 4 bpm at 710 psi pump pressure, PUW = 147K, SOW = 117K, Off bottom free rotating = 126K. Pumped Flo-Vis sweep at 03:00 hrs. and 05:00 hrs. DECOMP Continue milling from 9533' to 9535'. Work mill @ 9535 for -5 hours varying torque, WOM, rotary speed, pump rate etc. Makin hole extremel slowl . DECOMP Milling ~ 9535'. Parameters: 60 rpm, 3000# WOM, 10,500 ft-Ibs rotary torque (2,500 ft-Ib over), pumping ~ 3 BPM, 500 psi. DP twisted off, PJSM with crew. Stand back kelly, hang blocks, inspect crown, dead man, and drilling line. Rig up to POH and lay down DP. Estimate Warted oioe ~ -3200'.. DECOMP POH laying down 3 1/2" IF, S-135, 15.50# DP (77 joints) and 26 joints of 3-1/2", 13.30 DP. Broke off 19" in on joint # 104. DECOMP Service short bowl protector, perform per-tour checks. DECOMP PJSM with Baker Rep, MU 3.5" overshot, overshot extension, overshot top sub = 14.89'. DECOMP PU 3-1/2" DP from pipe shed and RIH and engage Fish with over shot at 3226', observed 10K over pull when pulling out of liner. DECOMP Replace the brake out tong hydraulic cylinder in Derrick. DECOMP Shear the pump out sub and POH 5l stands of 3-1/2" DP. DECOMP B/O UD fishing tools. DECOMP POH w/ 3-1/2" DP breaking every connection, inspecting, then re-torqueing and standing back. Pipe pulling wet. 1 bad joint of 3-1/2" DP found, 1 DC with a slight bow in it. DECOMP BOLD fishin tools. Fish left in hole: 5 blade junk mill (4-1/4"), 3-1/8" bit sub, 3-1/8" XO with 2-3/8" regular pin twisted o . , DECOMP Clean and clear rig floor. Swap out 3-1/8" DC. Call for 3-1/8" grapple for 4-1/8" over shot. DECOMP PUMU fishin BHA #21, 4-1/8" Overshot w/ 3-1/8" spiral grapple, XO, 3-1/8" DC. XO, 4-1/4" stabilizer, XO, 2 ea boot baskets, xo, bumper sub, Bowen jars, PO sub, 8 ea 4-11/16" DC's. OAL = 317.04'. DECOMP PU Kelly and calibrate rotary torque gauge. DECOMP RIH with BHA #21, 3-1/2" DP from Derrick to 146 stands and a single DECOMP PU 2 joints DP, 10' pup and the Kelly, circulate 3 BPM 600 PSI, start fishing at 9,529'. POW=157K, SOW=110K, 3 BPM / 600 PSI DECOMP Start fishin at 9,529'. POW=157K, SOW=110K, 3 BPM / 600 PSI. Engage fish, observed 300 PSI pump pressure increase, jars hit, made repeated attempts to engage fish at 9,531'. DECOMP Drope ball & rod, shear pump out sub, LD 10' pup, set back Printed: 6/30/2008 9:25:56 AM i • BP EXPLORATION Page 16 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABORS 3S Rig Number: Date From - To Hours ; Task Code NPT Phase Description of Operations 5/23/2008 01:30 - 03:00 1.50 FISH P DECOMP Kelly. 03:00 - 06:00 3.00 FISH P DECOMP POH standing 3-1/2" DP in Derrick, from 9,531' to 50 stands out at 05:30 hrs. Pipe pulling wet. 06:00 - 09:30 3.50 FISH P DECOMP POH 147 stands of 3-1/2" DP 09:30 - 10:30 1.00 FISH P DECOMP Stand back 8 ea 4-11/16" DC's. Lay down jars, bumper sub, boot baskets. BOLD 3-1/8" Drill collar and 4-1/8" overshot. Recoverd fish (4.25" mill w/ 2 XO's). 10:30 - 12:00 1.50 FISH P DECOMP Clean and clear rig floor. Remove all fishing tools which will no longer be required. Service Rig. 12:00 - 18:00 6.00 FISH P DECOMP Wait on 3.95" OD x 2" ID burn-over mill. 18:00 - 19:00 1.00 FISH P DECOMP PUMU BHA #22 3.958" Washover shoe, 3-1/2" DC, xo, stab, xo, 2 ea. boot bskt, xo, bumper sub, jars, PO sub, 8 ea 4 11/16" DC = 316.59 19:00 - 20:00 1.00 FISH DECOMP Calibrate and work on EPOCH Rigwatch system. 20:00 - 00:00 4.00 FISH P DECOMP RIH with BHA #22 on 3-1/2" DP from Derrick to 105 stands. 5/24/2008 00:00 - 01:30 1.50 FISH P DECOMP Continue RIH with BHA #22 on 3-1/2" DP from Derrick to 147 stands and 1 single to 9,504', PU Kelly and 10' pup. 01:30 - 06:00 4.50 FISH P DECOMP Establish parameters. PUW = 157K, SOW = 107K, ROTW = 125K, 3 bpm at 520 psi, 60 rpm at 8K torque off bottom, rotate and wash down to tag Fish at 9,532', torque on bottom = 10-12K, pump pressure = 670 psi. Mill to 9,542' and PU 1 joint DP, continue down to 9,551'. Did not tag w/mill. No-Go on TOL w/ 6 1/8" stabilizer. 06:00 - 08:00 2.00 FISH P DECOMP Pump Hi-vis sweep surface to surface. Flow check well, pump dry job. 08:00 - 10:30 2.50 FISH P DECOMP Call for slickline unit. POH (dry), standing back 3-1/2" DP. 10:30 - 14:00 3.50 FISH P DECOMP Take 9.6 Bbl pit gain with 46 stands 00H. MU TIW valve and head pin. Circulate 8.5 #/gal 2% KCL / 2# Biozan. Circulate 100 Bbls of 198 Bbl surface to surface circulation. Well increasing flow with gas. Close Annular and circulate 220 Bbls ~ 3 BPM, 470 PSI DP and 170 psi casing pressure. Shut down and observe. DP pressure to 0 psi, Csg pressure to 0 psi but flowing. Shut in, casing pressure to 10 - 30 psi. Bullhead 15 Bbls into formation, 1870 psi. Pressure of 1870 on DP and Csg held tight. Bleed back to 0 psi, 22 Bbls returns and flowina. Shut in Cso pressure 10 - 30 psi, DP pressure ~ 10 14:00 - 20:00 6.00 FISH P DECOMP Notify AOGCC of circumstances. Contact town engineer and discuss. Order 580 Bbls of 9 #/gal brine. Circulate down DP with returns through choke and gas buster while waiting on brine. Flowcheck, 0 psi on DP and Csg. Open Annular, fluid bubbling in riser. Close bag and continue to circulate while wait on brine. 20:00 - 22:00 2.00 FISH P DECOMP Displace well at 6,680' with 9 ppg brine through choke, taking returns to the Tiger tank. 3 BPM at 440 PSI on DP and 50 PSI on CSG, 235 Bbls pumped. Then diverted returns to Pits, 71 Bbls of 9 PPG brine. 22:00 - 00:00 2.00 FISH P DECOMP RIH 32 stands of DP to 8,660'. 5/25/2008 00:00 - 00:30 0.50 FISH P DECOMP Continue RIH to 9 420' 00:30 - 03:30 3.00 FISH P DECOMP Circulate 9 PPG brine surface to surface for a total of 337 Bbls. Observe well for 20 min. Well stable with no flow. 03:30 - 06:00 2.50 FISH P DECOMP POH from 9,420' with constant hole fill. 50 stands out at 05:30 hrs. Printed: 6/30/2008 9:25:56 AM ' ! • BP EXPLORATION Page 17 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABORS 3S Rig Number: Date From - To Hours Task Code NPT 5/25/2008 06:00 - 07:00 1.00 FISH P 07:00 - 09:00 2.00 FISH P 09:00 - 11:30 2.50 FISH P 11:30 - 13:30 2.001 vVHSUR P 13:30 - 16:00 2.501 WHSUR P 16:00 - 19:00 I 3.00 I EVAL I P 19:00 - 00:00 I 5.001 EVAL I P Phase !~ Description of Operations DECOMP Crew change. PJSM with crew and new driller. Reviewed well conditions. Service Rig. DECOMP 148 Stands OOH. DECOMP Stand back DC's. BOLD fishing tools and inspect mill face. Recoverd one silver dollar size piece of what appears to be a collar wedged in mill face. Very slight wear on mill, minimal scarring on 3.958" OD. DECOMP Pull wear ring. Install test plug. Unable to get a test. Reverse rubber gasket and attempt again. Call FMC for new test plug. DECOMP SLB on location. Load equipment into pipe shed. Install wear ring. ND pitcher nipple, NU shooting flange. Bob Noble w/ AOGCC notified of upcoming BOPE test ~ 14:30. DECOMP PJSM w/ SLS crew and rig crew. PUMU SLB pressure control equipment, lubricator, BOPE, packoffs etc. DECOMP PUMU SLB tools. PSI test lubricator to 500 psi. RIH w/ SLB slickline. BHA: 2.10" LIB, 2.50" centralizer, 3' of 1-1/4" stem and 2.25" centralizer. Run #2 = 3.80" centralizer, 3' of 1-1/4" stem and 2.25" centralizer. Run #3 = 2.10" LIB, 2.50" centralizer, 3' of 1-1/4" stem and 2.25" centralizer. Top of liner 5/26/2008 100:00 - 05:00 I 5.00 I EVAL I P 05:00 - 07:00 I 2.00 I EVAL I P DECOMP RIH w/ SLB slickline. BHA: #4 = 2.50" Mule shoe, 10' bailer , 2.50" centralizer, 3' of 1-1/4" stem and 2.25" centralizer. Top of fill 9,598'. Recovered 1 piece of 1.81 "spiral grapple previously i left in hole, on last baiter run. (Wedged in bottom of bailer DECOMP ~ RD SLB slickline, pressure control equipment from Rig floor and pipe shed. 07:00 - 08:00 1.00 WHSUR P DECOMP AOGCC right to witness BOPE testing waived by Bob Noble. ND shooting flange. NU pitcher nipple and flow-line. 08:00 - 14:00 6.00 WHSUR P DECOMP PJSM for BOPE testing. Attempt to test BOPE to 250 / 3500 psi. Use 3-1/2" test joint. Unable to get full body test due to leaking seal on rams. Tighten and re-test -fail. Call NOC for . new seal. No critical snare parts. PU Kelly and test upper and lower kelly cock. Perform Koomey drawdown. Replace seal in BOPE blind ram door. 14:00 - 18:00 4.00 WHSUR P DECOMP BOPE test with 3-1/2" and 4-1/2" test joints. Test to 250 / 3500 psi. Test annular to 250 / 3500 psi with 3-1/2" test joint. Annular preventer fail on high pressure test. Call for new GL element. Test all choke, HCR, Kill valves. Wait on critical 18:00 - 00:00 ~ 6.001 WHSUR ~ P 5/27/2008 ~ 00:00 - 01:00 i 1.00 i W HSU R i P 01:00 - 06:00 ~ 5.00 ~ FISH ~ P 06:00 - 09:00 I 3.001 FISH I P 09:00 - 11:30 I 2.501 FISH I P DECOMP PJSM and replace the GL Annular preventer element (with new). Flange between HCR Kill and Kill manual failed, tighten and tested ok. GL Annular tested with 3-1/2" test joint to 250 / 3500 psi. 2-7/8" X 5" VBR rams tested with 3-1/2" and 4-1/2" test joints to 250 / 3500 psi DECOMP Pull test plug and install short wear ring, blow down choke lines and LD test joint. DECOMP PU Wash over Mill 3.80" OD x 2.0" ID), 6 ea 2-7/8" DC, 11 ea 2-7/8" DP and jar, bumper sub, 2 ea boot baskets from pipe shed. RIH on 8 ea 4-11/16" DC from derrick. DECOMP RIH on 3-1/2" DP from Derrick. 90 stands in hole ~ 09:00. BOPE drill with rig crew. Review responses and responsibilities. DECOMP Continue RIH w/ BHA # 23. 10:30 - 130 stands in the hole. Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Page 18 of 20 Operations Summary Report Legal Well Common W Event Nam Contractor Rig Name: Date Name: ell Name: e: Name: From - To Z-03 Z-03 WORKO NABOB NABOB Hours VER S ALAS S 3S Task A DRILLING I Code ~~ NPT Spud Date: 9/1/1997 Start: 4/24/2008 End: 6/2/2008 I Rig Release: 6/2/2008 Rig Number: I Phase Description of Operations 5/27/2008 09:00 - 11:30 2.50 FISH P DECOMP Taaaed liner too at 9.520', PU Kelly. 11:30 - 17:30 6.00 FISH P DECOMP Establish parameters. PUW = 140K, SOW = 110K, ROTW = 125K, 3 bpm at 460 psi, 60 rpm at 8K torque off bottom, rotate and wash down to tag fill at 9,596', Mill to 9,603', Torque _ 8-10K, WOB = 0-8K. Torque and penetration droped off. Consult with ADW engineer. Had 60K over pull with pumps off. 17:30 - 19:30 2.00 FISH P DECOMP Pump the Kelly and 2 joints out of the liner because with pumps off the pipe became stuck when picking up. POH above the liner to 9,512', i e is free. Observe well for 20 min. ell stable with no flow. 19:30 - 00:00 4.50 FISH P DECOMP Pumped dry job, and POH from 9,512' to evaluate the Mill with continuos hole fill. 118 stands out at 00:00 hrs. 5/28/2008 00:00 - 01:00 1.00 FISH P DECOMP Continue POH to 141 stands of 3-1/2" DP. 01:00 - 04:30 3.50 FISH P DECOMP Stand 4-3/4" DC in Derrick, LD BHA, Jars, 11 joints PAC DP, 6 ea 3-1/8" DC. 04:30 - 05:00 0.50 FISH P DECOMP Service boot basket. Boot basket is em t . 05:00 - 07:30 2.50 FISH P DECOMP Cut and Slip drill line. Contact intervention engineer and agree to run the same mill once again, this time omitting the PAC pipe for a more sturdy BHA. 07:30 - 08:30 1.00 FISH P DECOMP PU BHA #24: Mill shoe, 3-3/8" Drill Collars, Boot Baskets, Jars, and Pump out sub. 08:30 - 16:45 8.25 FISH P DECOMP RIH w/ BHA #24 to the top of the liner at 9520' MD. No losses to the formation. Entered liner without any problems. RIH to 16:45 - 00:00 7.25 FISH P DECOMP PUMU Kelly. Establish milling parameters.POW = 142K, SOW = 113K, Free Rotating WT = 125K, Free spinning torque = 6,500 ft-Ibs at 60 RPM. Pump pressure was 700 psi at 3 BPM. Sat 8k-Ibs. WOB at 9598' MD and milled easily to 9602' MD with 7,000 ft-Ibs of torque while circulating at 3 BPM and 800 psi. Stopped milling at 9602' MD with 8k- Ibs WOB. Increase WOB to 12k-Ibs. Began milling slowl from 9602' to 9604' with 7,000 ft-Ibs. of torque and a pump pressure of 900 psi at 3 BPM. Pump pressure increased to 1000 psi at 9604' Ma. Pumped Hi-vis sweep. 5/29/2008 00:00 - 04:30 4.50 FISH P DECOMP Continue to Mill at 9 604' MD to 9 606' MD, had 35K over pull, pipe is free, pumped Hi-vis sweeps. 04:30 - 05:00 0.50 FISH P DECOMP POH from 9,606' MD to top of liner at 9,505'. Well is stable. 05:00 - 14:00 9.00 FISH P DECOMP POH from 9,505' with continous hole fill, pipe pulling wet. Pump dry job. Continue POH w/ BHA #24 while S/B DP. Losses are ~- at - 1 BPM. 14:00 - 15:30 1.50 FISH P DECOMP UD BHA #24 and inspect mill. Mill exterior is completely worn. Mill bottom is heavily worn. The inside fo the mill is completely worn from the base up to 2' in. The tattletale pin was broken and bent upward. The boot baskets were 1/4 of the way full of metal shavings. 15:30 - 16:30 1.00 FISH P DECOMP Consult with town and decide to go for the prong. PUMU BHA #25: Overshot and grapple with 7" casing scraper. 16:30 - 23:30 7.00 FISH P DECOMP RIH w/ BHA #25 to the top of the liner at 9520' MD 23:30 - 00:00 0.50 FISH P DECOMP RU to displace Well and take on 9 ppg Brine to Pits. 5/30/2008 00:00 - 02:30 2.50 FISH P DECOMP PJSM with crew and Vac truck drivers. Displaced with 9 ppg Brine at 3 bpm / 660 psi, at 9,510' MD, pumped a total of 322 bbls, taking returns to the Tiger tank. 02:30 - 05:00 2.50 FISH P DECOMP RIH 2 stands from Derrick, PU Kelly and wash to engage Fish Printed: 6/30/2008 9:25:56 AM r ~ • BP EXPLORATION Page 19 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABOBS ALAS KA DRILLING I Rig Release: 6/2/2008 Rig Name: NABOBS 3S Rig Number: Date From - To ~ , Hours Task ,Code'.. NPT ~ Phase ~ Description of Operations - - - - -- - - 5/30/2008 02:30 - 05:00 2.50 FISH P DECOMP at 9,603' observed over pull. Monitor Weil for 20 min. Well is stable. 05:00 - 06:00 1.00 FISH P DECOMP Set back Kelly, POH LD 3-1/2" DP and reciprocate 7" csg scraper from 9,371' to 9,244', with continuous hole fill. 06:00 - 11:00 5.00 FISH P DECOMP SOH w/ BHA #25 and fish while UD DP into the Pipe Shed. 11:00 - 16:00 I 5.001 FISH I N 16:00 - 00:00 8.001 FISH P 5/31/2008 00:00 - 01:00 1.00 FISH P 01:00 - 03:30 2.50 FISH P 03:30 - 04:00 0.50 FISH P 04:00 - 05:00 1.00 FISH P 05:00 - 06:00 1.00 FISH P 06:00 - 08:00 2.00 BUNCO 08:00 - 14:30 6.50 BUNCO 14:30 - 16:00 1.50 BUNCO 16:00 - 00:00 8.00 BUNCO 6/1/2008 100:00 - 13:00 I 13.001 RU 13:00 - 15:00 I 2.001 RU 15:00 - 16:00 I 1.001 RNTBHC~ P 16:00 - 20:00 i 4.001 CHEM ~ P 20:00 - 22:30 I 2.501 RU 22:30 - 00:00 1.50 WHSUR P 6/2/2008 00:00 - 02:30 2.50 BOPSU P DECOMP Dropped 1-joint of Drill Pipe from the Floor to the Pipe Shed. Shut down operations. Discuss how incident happened and how it can be prevented in the future. DECOMP Continue POH w/ BHA #25 and UD DP into the Pipe Shed. Filling hole with displacement. 0 Bbls/hr of losses to the formation. 280 joints LD at 00:00 hrs. DECOMP Continue POH LD 3-1/2" DP, 296 joints layed down. DECOMP BO / LD BHA #25. No Fish recovered. Large deep scares on out side of overshot. Service bootbaskets and recovered 2 cups of fine mill cutting. DECOMP Clear Rig floor of Fishing tools. DECOMP MU test joint and pull short bowl protector from tubing head. DECOMP LD Kelly and swivel in to pipe shed. RUNCMP R/U Stabbing Board. RUNCMP Load and Strap 4-1/2" Vam Top Tubing and jewelry. RUNCMP R/U Chrome Tubing handling tools on the Rig Floor. RUNCMP PJSM. Run 4-1/2", 12.6#, 13CR, Vam Top completion: UMI Oversho , - ipp e, a er - ac er, -Nipple, 9-GLMs, X-Nipple, and Hanger. Use Jet Lube Seal Gaurd. All connections below Packer are Baker Lok'd. M/U torque turn tubing to optimum torque of 4,440 ft-Ibs. with Nabors casing crew. RUNCMP Continue to Run 4-1/2",12.6#, 13Cr, Vam Top tubing completion assembly. Ran 130 joints at 05:30 hrs. RUNCMP Ta to of Liner 21.5' in on Joint #220. UD joint #220, #219, and #218. Top of liner at 9,508'. Space out so that the bottom of the overshot is 3.5' above the liner. When the packer sets, there should be 1' of stroke which will place the bottom of the completion 2.5' above the liner. P/U space out pups (9.86,9.84,7.56,3.82,2.10) and Joint #218. TUBHGR P/U and M/U Tubing Hanger. M/U landing joint. Land Hanger. P/U 100k-bs. S/O 95k-Ibs. RILDS. Clear floor of chrome handling equipment. CLEAN PJSM. Reverse circulate 195 Bbls of inhibited seawater at 36PM and 270 psi while taking returns to the tiger tank. RUNCMP Dro ball and rod. Pressure u on tubin to 3 500 si for 30 minutes then bleed to 1,500 si. Pressure u IA and tested 3 500 si for 30 minutes. Bleed off tubin ressure and observe DCK shear at 2 000 si. Pumped 1 BPM ~ 160 psi down tubing with returns. Pumped 1 BPM ~ 170 psi into IA with returns up the tubing. Witnessed by WSL, Tourpusher, Backer Rep. RUNCMP Set and Test TWC with FMC tech, 3,000 psi from above and 1.000 si from below for 10 min. Blow and R/D down lines. RUNCMP Blow down lines, drain BOP stack, unhook turnbuckles, pull flow riser, unhook koomey and Hi-pressure lines and N/D Printed: 6/30/2008 9:25:56 AM • • BP EXPLORATION Page 20 of 20 Operations Summary Report Legal Well Name: Z-03 Common Well Name: Z-03 Spud Date: 9/1/1997 Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008 Rig Name: NABOBS 3S Rig Number: ' Date From - To Hours Task Code NPT Phase Description of Operations 6/2/2008 00:00 - 02:30 2.50 BOPSU P RUNCMP BOPE and place stack in cradle. 02:30 - 05:30 3.00 WHSUR P RUNCMP NU new Adapter Flange and Tree. Test hanger void to 5,000 psi for 30 minutes with FMC tech and WSL. Test Tree body with diesel to 5,000 psi with no visable leaks. 05:30 - 06:00 0.50 WHSUR P RUNCMP PU / MU lubricator, Well tech pulled TWC 06:00 - 08:30 2.50 WHSUR P RUNCMP Pump 75 Bbls of Diesel down IA while taking returns to the tiger tank. U-tube with Tubing for 1-hour. 08:30 - 10:00 1.50 WHSUR P RUNCMP Set BPV and test to 1000 psi from below with LRS. 10:00 - 12:30 2.50 WHSUR P RUNCMP UD Stabbing Board. Secure Tree and Cellar., Release rig at 1230- hrs. Printed: 6/30/2008 9:25:56 AM 05/30/08 ~ch~6~rger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well .Inh !t ... 1 nn rls wl.. n_a_ Z-03 11975773 ___- -___-- __-- SFRT ~ (~ ~_.~ 05/20/08 ._.- 1 ........ vv 1 P2-32 12066522 MEM TEM SURVEY - ~ 05!19/08 1 1 18-13B 12021159 MEM PROD PROFILE - ~ ~ 05/18/08 1 1 Z-03 11975773 USIT - G~~ 05/19/08 1 1 W-29 11999017 INJECTION PROFILE 05/26/08 1 1 15-39A 11999018 PRODUCTION PROFILE b(p - c, 05/28/08 1 1 07-30A 11963095 SCMT - ~ 05/27/08 1 1 14-096 11982432 PROD PROFILE W/FSI - Q. v 05/27/08 1 1 A-34A 12057614 USIT - jp ' /(pGfZj~- 05/26/08 1 1 GNI-04 11824353 OH LDWG EDIT (DSI) V-t _ I ~, 11/07/07 1 1 _..__ .._...._.._~_~. _. ..~...... ... .............. ....v ..~. vnr~mu vnG vvr. GNVf1 I V. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. -- Anchorage, Alaska 99508 Date Delivered: ~ - ~ lv!t~y N0.4727 ~~~~ TI'~ ~ ~ 208 Company: State of Alaska zl v Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 Anchorage, AK 99503-2 38 / ATTN: Beth /'„' s`.-/ Received by: IJL/L "~ • r ~J 05/30/08 U4~1~1~~G1-~r~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth wpu .Inh a ~lNE~ JUN ~ .~ 2008 1 .... new.. ..+:.... NO.4727 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ns.. n~ n_~_.. nn Z-03 11975773 SFRT +- (~ 05/20/08 1 1 P2-32 12066522 MEM TEM SURVEY - ~ 05/19/08 1 1 18-138 12021159 MEM PROD PROFILE - J ~ 05/18/08 1 1 Z-03 11975773 USIT - ~~,3 05/19/08 1 1 W-29 11999017 INJECTION PROFILE d( 05/26/08 1 1 15-39A 11999018 PRODUCTION PROFILE - c, 05/28/08 1 1 07-30A 11963095 SCMT - ~ 05/27/08 1 1 14-096 11982432 PROD PROFILE W/FSI - 2, v 05/27/08 1 1 A-34A 12057614 USIT - /p~j' / G/~~- 05/26/08 1 1 GNI-04 11824353 OH LDWG EDIT (DSI) V-t _ I 4 11/07/07 1 1 rLGN~IG N4 NYV YYLCYVG fl Gtr Gir' 1 or .71<7~Y IIYl7 NIVU r1C 1 UrS1Y11Y1a VIVG \.VYT CHI.n 1 V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. - Anchorage, Alaska 99508 ~, ,. Date Delivered: ~ 9 ~('rg Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 Anchorage, AK 99503-2 38 / ATTN: Beth /'„ C/ ReceivedReceived by: l//, • • STATE OF ALASKA 11/14/07 Of ~ AND GAS CONSERVATION COMMISSION BOPS Test Report Submit to: Contractor: Nabors Rig No.: 3S DATE: 5/26/2008 Rig Rep.: J.Henson/R.Bjofius Rig Phone: 659-4487 Rig Fax: 659- 4486 Operator: BP Op. Phone: 659- 4485 Op. Fax: 659-4628 Rep.: J.Menke/D.Rhodes Field/Unit & Well No.: GPB Z-03 PTD # 1971310 ~~~ { Operation: Drlg: Workover: X Explor.: Test: Initial: Weekly: X Bi-Weekly Test Pressure: Rams: 250/3500 Annular: 250/3500 Valves: 250/3500 TEST DATA MISC. INSPECTIONS: Test Result Test ResuR Location Gen.: P Well Sign P Housekeeping: P Drl. Rig P PTD On Location P Hazard Sec. P Standing Order Posted P BOP STACK: Quantity Size Test ResuR Annular Preventer 1 i 3 5/8 5000 FP Pipe Rams 1 2 7/8" x 5" P Lower Pipe Rams Blind Rams 1 Blind P Choke Ln. Valves 1 3 118" 5000 P HCR Valves 2 3 1/8" 5000 P Kill Line Valves 1 2 1/16" 5000 P Check Valve 0 NA MUD SYSTEM: Visual Test Alarm Test Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P Test Results FLOOR SAFETY VALVES: Quantity Test R Upper Kelly 1 P Lower Kelty 1 P Ball Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 13 P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 3000 P Pressure After Closure 1600 P 200 psi Attained 25 sec. P Full Pressure Attained 2 min 4 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 4~ 2000 PSI Number of Failures: 2 Test Time: 14 Hours Components tested ALL Repair or replacement of equipment will be made within days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: Remarks: Annular failed changed out aackina unit test U 250 8~ 3500 w(ok) Blind ram door seal failed changed out test to 250 8~ 3500 psi tok) 24 HOUR NOTICE GIVEN YES X NO Date 05124/08 Time 8:00 Test start 10::00 AM Finish BOP Test (for rigs) ~ ~ ~~`~ ~ ~ ZQ~~ BFL 11/14/07 ived By Lou Grimaldi Witness J.Menke / J.Henson Nabors 3S BOP Test GPB Z-03 5-26-08.x1s • • STATE OF ALASKA 11/14/07 OIL AND GAS CONSERVATION COMMISSION BOPE Test Report submit to: Contractor: Nabors Rig No.: 3S DATE: 5/11/2008 Rig Rep.: J. Greco/ J. Fritts Rig Phone: 659-4487 Rig Fax: 659- 4486 Operator: BP Op. Phone: 659- 4485 Op. Fax: 659-4628 Rep.: W.Hoffman/B. Burson Vry,y Field/Unit & Weli No.: GPB Z-03 PTD # 1971310 ~'T Operafion: Drlg: Workover: X Exptor.: Test: Initial: Weekly: X Bi-Weekly Test Pressure: Rams: 250/3500 Annular: 250/3500 Valves: 250/3500 TEST DATA MISC. INSPECTIONS: FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.: P Well Sign P Upper Kelly 1 P Housekeeping: P Drl. Rig P Lower Kelly 1 P PTD On Location P Hazard Sec. P Ball Type 1 P Standing Order Posted P Inside BOP 1 P BOP STACK: Quantity Size Test Result CHOKE MANIFOLD: Annular Preventer 1 13 5/8 5000 P Quantify Test Result Pipe Rams 1 2 7/8" x 5" P No. Valves 13 P Lower Pipe Rams Manual Chokes 1 P Blind Rams 1 Blind P HydrauNc Chokes 1 P Choke Ln. Valves 1 3 1/8" 5000 P HCR Valves 2 3 1/8" 5000 P ACCUMULATOR SYSTEM: Kill Line Valves 1 2 1116" 5000 P Time/Pressure Test Result Check Valve 0 NA System Pressure 3050 P Pressure After Closure 1500 P MUD SYSTEM: Visual Test Alarm Test 200 psi Attained 33sec P Trip Tank P P Full Pressure Attained 2 min 20 sec P Pit Level Indicators P P Blind Switch Covers: All stations P Flow Indicator P P Nitgn. Bottles (avg): 4@1925 Meth Gas Detector P P H2S Gas Detector P P Test Results Number of Failures: 0 Test Time: 5.0 Hours Components tested ALL Repair or replacement of equipment will be made within days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: Remarks: Tested w/3 1 /2" 8~ 4 1 /2" test its /tested upper and lower ketlv valves 24 HOUR NOTICE GIVEN YES X NO Waived By Date 05110/08 Time 1130 hrs Witness J.Jones/ Fritts! Burson Test start 1900 hrs Finish 0000 hrs BOP Test (for rigs) BFL 11/14/07 5~~~ MAY ~ ~ 2008 Nabors 3S BOP Test GPB Z-03 5-11-08.x1s STATE OF ALASKA 11/14/07 OIL AND GAS CONSERVATION COMMISSION ROPE Test Report Submit to: Contractor: Nabors Rig No.: 3S DATE: 4/27/2008 __ Rig Rep.: G.SweattlR.Bjorh~u Rig Phone: 65g-4487 Rig Fax: 659- 4486 Operator: BP Op. Phone: 659- 4485 Op. Fax: 659-4628 Rep.: J.Menke/D.Rhodes FieidlUnit 8~ Weil No.: GPB Z-03 PTD # 197'f310 Operation: Drtg: Woricover: X Exptor.: Test: initial: X Weekly: $"t-Weeldy Test Pressure: Rams: 250/35QEI Anrx~ar: 250/350f3 Vakres: 250/3500 MISC. INSPECTIONS: Test Result Test Result Location Gen.: P WeH Sign P Housekeeping: P Dri, Rig P PTD On Location P Hazard Sec. P Standing Order Posted P BOP STACK: Quantrty Size Test Result Annular Preventer 1 i 3 518 50(313 P Pipe Rams 1 2 718" X 5" P Lower Pipe Rams Blind Rams 1 t~rxf P Choke Ln. Valves 1 3 '1!8" P HGR Valves 2 3 '118" 5€~4 _ P Kitt Line Valves 1 2 '1116" 5004 P Check Valve 0 NA FLOOR SAFETY VALVES: Quantity Test RE Upper Kelly 1 NT Lower KeNy 1 NT Baif Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Naives i 3 P Manual Chokes 1 P Hy Chokes t P ACCt)IdtIJLATOit SYSTEM: TirnelPressure System Pressure 3100 Pressure After Close _ 1600 Ml7D SYSTEM: Visual Test Alarm Test 200 psi Attained 20sec Trip Tank P P Fug Pressure Attar t mkt 35 sec Pit Level Indicators P P t3~d Swit€~ Govern: Flow Indicator P P Niter. Bottles (avg~: 4~t75#} _ Meth Gas Detector P P H2S Gas Defector P P Test Results Number of Failwes: O Test Time: 4_5 Hours: Repair or rep cement of ec~tipmerst mitt be made within days.. Inspector 659-36t33T, faxes with written confirmation to Supervises at: Remarks: Used two electric Humors on the Aecum. Build up. 24 HOUR NOTICE YES X NO Date 04123/08 Time Finish BOP Test (for rigs) BFL 11/14/07 ,~~ qp~ ~ ~ 2D08 0701} hrs Test Result P P P P Comt~anents tested ALL -- Notify ttie North Slope Witness G.SweattlJ.Menke Nabors 3S BOP Test GPB Z-03 4-27-08.x1s ---~ a g;~ __~ ~ ~~ ~ ~ ~ i ~~ ~ ~ ~ SARAH PAL/N, GOVERNOR L1•i4[a-7~ OI~ ~ ~ 333 W. 7th AVENUE, SUITE 100 CO1~SI' RQATIOl~ CO1rII~'IISSIOI~T ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 David Reem Engineering Team Leader BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 ~ 3 ~ ~~ . Re: Prudhoe Bay Field, Prudhoe Bay Pool, Z-03 Sundry Number: 308-099 ~~N~ APR ~ ~ 200 Dear Mr. Reem: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants .for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Daniel T. Seamount, Jr. Chair DATED this 2nd day of April, 2008 Encl. - Q ' ~ q~ STATE OF ALASKA ~l(~ ¢~ ~ 1~~~~~~® ~~'U ALASKA OIL AND GAS CONSERVATION COMMISSION MAR 2 7 APPLICATION FOR SUNDRY APPROVAL ~~ 20 AAC 25.280 ~I~cka Oil 8 G2lS COtt5. 1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Ext~Of~ ~ Iter Casing ~ ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Change Approved Program ~ II Tubin ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 197-131 3. Address: ^ Service ^ Stratigraphic 6. API Number: . P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22787-00-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: PBU Z-03 Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): - ADL 028262. a 83.75' ~ Prudhoe Bay Field !Prudhoe Bay Pool 12. PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 10187 ~ 9210- 10101 9124 9500 None sin Len th Size MD TVD Burst Colla se Structural nductor 80' 2 80' 80' 1490 470 Surface 3072' 9-5/8" 3104' 3080' 5750 3090 Intermediate 9670' 7" 9700' 8724' 7240 5410 Pr ion Liner 679' 4-1/2" 9508' - 10187' 8533' - 9210' 8430 7500 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9844' - 9982' 8868' - 9005' 3-1/2", 9.3# L-80 9532' Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV MD (ft): 9475' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: April 17, 2008 ®Oil ^ Gas ^ Plugged ^ Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Frank Roach, 564-4373 Printed Name vid Reem Title Engineering Team Leader ~ Prepared By Name/Number: Signature ~ Phone 564-5743 Date .S'f Terrie Hubble, 564-4628 Commission Use Onl Sundry Number: Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity ,BOP Test ^ Mechanical Integrity Test ^ Location Clearance Other: ~~~~ f~~c ~~~~ .~ Subsequent Form Required: ~ L a ' APPROVED BY Z y A roved B COMMISSIONER THE COM ISSI N Date Q Form 10-403 Revised'p6`/2006 Submit In Duplicate ORIGINAL ~~'~~ `~ ~ ~ by cr,y Z-03 Rig Workover Scope of Work: Expense RWO: Pull 3-'/z" completion, mill and retrieve Baker S-3 packer and tailpipe, run 2'/" x 3-'/z" tapered chrome perforated scab liner with Swell Packers and log in place, run 4-'h" 13Cr- 80 tubing with Baker S-3 packer set at9300' MD. MASP: 2855 psi Well Type: Ivishak Producer Estimated Start Date: April 17, 2008 Production Engineer: Dan Robertson Intervention Engineer: Frank Roach Pre-riq prep work: O 1 Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breakage (check one at a time). Well is secured at this time with PX lu 10/05/2007 set . PPPOT-T & IC. S 2 Drift tubin for 'et cutter to 9500' MD. **NOTE: Potential Parted Tubin @ 7750'** E 3 Power Jet cut 3-'/z" tubing ~ 9472' MD (Ref 09/27/1997 tubing summary). Jet cut desired to be in the bottom 1' of the first u ~oint above acker. F 4 Circulate well with seawater and cap with diesel thru the cut. CMIT-TxIA to 3500 psi. MITOA to 2000 si. Bleed WHPs to 0 si. O 5 Set a BPV in the tubin han er. O 6 Remove the wellhouse & flow line. Level the ad as needed for the ri . Proposed Procedure 1. MIRU workover rig. ND tree. NU and test BOPE pipe rams to 3500 psi. Test annular preventer to 3500 psi. Circulate out freeze protection fluid and circulate well to clean seawater through the cut. 2. Retrieve 3-'/z" tubing string down to the packer. 3. Change out 7" casing packoff and test to 4300 psi. 4. Mill and retrieve Baker S-3 packer at 9475' MD. 5. Run 2-'/" x 3-'h" tapered chrome perforated scab liner with swell packers to cover 4-1/z" production liner. (Top of scab liner inside 7" casing at 9450'). Spot liner per drillpipe measurement. Confirm depths with GR log correlation and adjust as needed. 6. Run 4-'/z" 13Cr-80 tubing with Baker S-3 packer set at 9300' MD. 7. Displace the IA to packer fluid and set the packer. 8. Test tubing and IA to 3500 psi. Freeze protect to 2000' MD. 9. Set BPV. ND BOPE. NU and test tree. RDMO. rTREE= 4-1/16"CAMERON WELLHEAD = 11" FMC ACTUATO = BAK KB. ELEV = 83.75' BF. ELEV = 54.05' KOP = 2573' Max Angle = 35 @ 5780' Datum MD = 9860' Datum TVD = 8800' SS 9-5/8" CSG, 40#, L-80 BTC, ID = 8.681" 17" MARKERJOINT I Minimum ID = 2.750" @ 2230' 3-1 /2" OTIS SSSV NIPPLE TOP OF4-1/2" LNR 3-1/2" TBG, 9.2#, L-80 TDS, .0087 bpf, ID = 2.867" (PUP JOINTS) 7" CSG, 26#, L-80, .0383 bpf, ID = 6.276" PERFORATION SUMMARY REF LOG: BHCS ON 09/24/97 ANGLE AT TOP PERF: 4 @ 9844' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 6 9844 - 9857 C 10/02/03 2-112" 6 9864 - 9882 C 10/02/03 2-1/2" 6 9888 - 9896 C 10/02/03 2-1/2" 6 9900 - 9906 C 10/02/03 2-1/2" 8 9910 - 9925 C 07/19/98 2-1/2" 4 9928 - 9940 C 08/06/99 2-1 /2" 8 9945 - 9982 C 07/30/98 PBTD 4-1/2" LNR, 12.6#, L-80 MOD-BUTT, .0152 bpf, ID = 3.953" Z ~O ~ SAFETY NOTES: **3-1/2" PUP JOINTS HAVE SMALLER ID (2.867"} THAN 3-1 f2" TBG (2.992")** 2230' 3-1/2" HES SSSV LAND NIP, ID = 2.75" GAS UFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3070 3049 21 CAM DMY RK 0 09/30/07 5 5107 4774 33 CAM DMY RK 0 09/30/07 4 6607 6020 32 CAM DMY RK 0 09/30/07 3 7768 6993 34 CAM DMY RK 0 09/30/07 2 8864 7917 29 CAM DMY RK 0 09/30/07 1 9399 8425 6 CAM DMY RK 0 09/14/03 9462' 3-1/2" HES X NIP, ID = 2.750" 9473' 3-1 /2" X 4-1(2" XO, ID = 2.938" 9475' 7" x 4-1/2" BKR S-3 PKR, ID = 3.875" 9478' 4-1/2" X 3-1/2" XO, ID = 2.938" 9500' 3-1/2" HES X NIP, ID = 2.750" 9500' 3-1/2" PX PLUG (10/02/07)CA 950$' 7" x 5" ZXP LTP w / HMC LNR HGR, ID = 4.375" 9520' 3-1/2" HES X NIP, ID = 2.750" 9528' 5" X 4-1/2" XO, ID = 3.958" 9532' 3-1/2" WLEG, ID = 2.920" 9527' ELMD TT LOGGED ? DATE REV BY COMMENTS DATE REV BY COMMENTS 09128/97 JLM ORIGINAL COMPLETION 09/14/03 JCMITLP GLV GO 05/18/05 WRR/PJC ELMD CORRECTION 08/26/07 SV PERFORATIONS (10/02/03) 10/01/07 JPK/PJC DRAWING CORRECTIONS 01/17!08 JLJ/PJC SET PX PLUG (10/02/07) PRUDHOE BAY UNff WELL: Z-03 PERMff No: 1971310 API No: 50-029-22787-00 SEC 19, T11 N, R12E, 976' SNL & 1427 EWL BP 6cploration (Alaska) TREE= 4-1/16" CAMERON W~1_LHEAD = 11" FMC ACTUATOR = ~ - BAKER KB. EV = 83.75' BF. ELEV = 54.05' KOP = 2573' Max Angle = 35 @ 5780' Datum MD = 9860' Datum TV D = 8800' SS 9-5/8" CSG, 40#, L-80 BTC, ID = 8.681" i 7" MA RKER JOINT Minimum ID = 2.750" @ 2230' 4-1/2" TBG, 12.6#, 13Cr-80 Vam Top, .0152 bpf, - TOP OF 4-1/2" LNR PERFORATION SUMMARY REF LOG: BRCS ON 09/24/97 ANGLE AT TOP PERF: 4 @ 9844' Note: Refer to Production DB for historical pert data DATA 7" CSG, 26#, L-80, .0383 bpf, ID = 6.276" --{ 3-1/2" TBG, 9.2#, 13Cr-80 STL, .0087 bpf - 3-1/2" PERFORATED TBG, 9.2#, 13Cr-80 - STL, .0087 bpf Z-03 SAFETY NOTES: PROPOSED 4-1/2" HES X NIP, ID = 3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 8 7 6 5 4 3 2 1 O O O ~ O O O 2-718" PERFORATED TBG, 6.5#, 13G-80 - VamTop, .0058 bpf 2-7/8" PERFORATED TBG, 6.5#, 13Cr-80 - VamTop, .0058 bpf 2-7/8" TBG, 6.5#, 13Cr-80 Vam Top, .0058 bpf - PBTD - 4-1/2" LNR, 12.6#, L-80 MOD-BUTT, .0152 bpf, ID = 3.953" ~~4-1/2" HES X NIP, ID = 3.813" 7" x 4-1/2" BKR S-3 PKR, ID = 3.875" 4-1/2" HES X NIP,ID = 3.813" 4-1/2" HES XN NIP, ID = 3.725" WLEG 17" x 4-1/2" ZXP LTP w / HMC LNR HGR. ID = 4.375" 1 5" x 3-1/2" X/O 3-1/2" x 2-7l8" X/O I HES SWELL PACKER I HES DATE REV BY COMMENTS DATE REV BY COMMENTS 09/28/97 JLM ORIGINAL COMPLETION 09/14/03 JCM/TLP GLV GO 05/18/05 WRR/PJC ELMD CORRECTION 08/26/07 SV PERFORATIONS (10/02/03) 10/01/07 JPK/PJC DRAWING CORRECTIONS 01!17/08 JLJ/PJC S~ PX PLUG (10/02/07) PRUDHOE BAY UNIT WELL: Z-03 PERMfT No: 1971310 API No: 50-029-22787-00 SEC 19, T11 N, R12E, 976' SNL 8~ 1427' EWL BP Exploration (Alaska) O O O O Schlumbørger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well W-19AL 1 17-19A V-04 Z-21A Z-03 05-38 Y-29A B-16 Z-22B Z-14B P2-45A 17-09 F-33 4-08/P-27 3-17F/K-30 MPB-50 S-125 Job# 11890312 11855512 11855513 11594526 11767142 11686787 11855514 11676969 11594525 11849935 11594529 11846820 11661176 11630506 11649961 40011604 40015467 5~ED OC1 :1 1 2007 Loa Descri tion SBHP & TEMP ,:)():4 - -:::¡-:-.<, SBHP SURVEY I ~ '"). ~ h~ ~ SBHP SURVEY ~)ùCo - 1~G-1 SBHP SURVEY ::J/'Jt) -J()/ LDL 'C::;I"'+-_~ I LDL ¡C1r- - J'k~ DDL to¡ G? - C'A ( PRODUCTION PROFILE f~ -()/:)S SBHP SURVEY - 60~ -¡;; ,^,4t, SBHP SURVEY ::;/')(o-f'A<::: SBHP SURVEY / C; q -I'?/t../ LDL /111- 6CJ () MEMORY SBHPS I t:')ú, - 003 LDL I) 'Ie 115 "':}- - h{)'7( MCNL .;)0"3 -.::J./f." -tt }iÇ"(,,¡lJ OH MWD/LWD EDITi)1(\ :::JH-J- x:::J 151r.f3. OH MWD/LWD EDIT ~D~-o'Í53 tt. ,S"'t" ~ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Date 09/29/07 09/26/07 09/27/07 10/07/07 10/01/07 09/27/07 09/28/07 10/12/07 10/06/07 10/02/07 10/16/07 10/19/07 10/19/07 10/04/07 04/17/07 02/27/05 07/14/07 NO. 4464 Company: State of Alaska Alaska Oil & Gas Cons Gomm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay, Endicott, Aurora, Milne Pt., pt. Mac BL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 Color CD 1 1 1 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Aoch"",o, AK "50~~8 ATTN: Beth £ Received by: C¡ ^--- 10/25/07 . . Z-03 (PTD #1971310) UNDER EVALUATION - Sustained Casing Pressure on IA Page 1 of 1 Regg, James B (DOA) NSU, ADW Well Integrity Engineer [NSUADWWelllntegrityEngineer@BP.com] Wednesday, September 12, 20076:42 AM Regg, James B (DOA); Maunder, Thomas E (DOA); Fleckenstein, Robert J (DOA); Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; GPB, Optimization Engr; GPB, Wells Opt Eng; GPB, Prod Controllers; Robertson, Daniel B (Alaska); NSU, ADW WL & Completion Supervisor Cc: Roschinger, Torin T.; Holt, Ryan P (ASRC) Subject: Z-03 (PTD #1971310) UNDER EVALUATION - Sustained Casing Pressure on IA Attachments: Z-03.pdf From: 0f111?k/D7 Sent: To: All, Well Z-03 (PTD #1971310) has been found to have sustained casing pressure on the IA. The wellhead pressures were 2600/2600/440 psi on 09/09/07. A subsequent TIFL failed later on 09/12/07. The well has been classified as Under Evaluation and may be produced under a 28-day clock. The plan forward for this well is as follows: 1. D: TIFL - FAILED 2. APE: Eval DGL V design 3. S: Set DGLVs 4. F: MIT-IA to 3000 psi J4 ::- ¿'-¿¡<Dr:> " ~ 35 ~ t:¡' 'i) !vULt? úÌé- fv c9 ~~. ¡cr CfJ 41 :z-. A wellbore schematic has been included for reference: «Z-03.pdf» Please call if you have any questions or concerns. Thank you, Paul Austin for Anna Dube Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 9/25/2007 TREE = 4-1/2" CAMERON WELLHEAD" ACTUA TOR = KB. ELEV = BF. ELEV " KOP= Max Angle = Datum MD " Datum 1VD = Z-03 I SAFETY NOTES: I PBTD I 2230' H3-112" HES SSSV LAND NIP, 10 = 2.75" I I . GAS LIFT MANDRELS µ ST MD 1VO DEV !yPE VLV LATCH PORT DATE 3104' L 6 3070 2965 23 CAM DOME RK 16 09/14/03 5 5107 4689 33 CAM DOME RK 16 09/14/03 4 6607 5936 33 CAM DOME RK 16 ? U 3 7768 6909 34 CAM DOME RK 16 09/14/03 2 8864 7833 30 CAM S/O RK 20 ? 2230' 1 9399 8341 6 CAM DMY RK 0 09/14/03 LE I I 9462' H 3-1/2" HES X NIP, ID = 2.750" I :g ¿S 9475' 1--17" x 3-1/2" BKR S-3 PKR, ID - 3.875" I I I 9500' H 3-1/2" HES X NIP, ID = 2.750" I I 9508' I I 9520' 1--1 3-1/2" HES X NIP, 10= 2.750" I I " I 9532' 1/ 9532' 1--13-1/2" WLEG I I I 9527' H ELMDTTI " I 9700' ~ ... 0 RY 24/97 9844' storical perf data n/Sqz DATE 0 10/02103 0 10/02/03 0 10/02/03 0 10/02/03 0 07/19/98 0 08/06/99 0 07/30/98 I 10101' I x I xx .x " 10187' I I 9-5/8" CSG, 47#, L-80, 10 = 8.681" I Minimum ID = 2.750" @ 3-1/2" OTIS SSSV NIPP I TOP OF 4-112" LNR 13-1/2" TBG, 9.2#, L-80, .0087 bpf, ID" 2.992 7" CSG, 26#, L-80, .0383 bpf, ID = 6.276 PERFORA TION SUMMA REF LOG: SHCS ON 09/ ANGLEAT TOP PERF: 4@ Note: Refer to Production DB for hi SIZE SPF INTERVAL Op 2-112" 6 9844 - 9857 2-1/2" 6 9864 - 9882 2-1/2" 6 9888 - 9896 2-1/2" 6 9900 - 9906 2-1/2" 8 9910 - 9925 2-1/2" 4 9928 - 9940 2-1/2" 8 9945 - 9982 14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID" 3.953 DATE 09128197 OS/28/01 09/14/03 05/18/05 08/26/07 REV BY COMMENTS JLM ORIGINAL COMPLETION RNlTP CORRECTIONS JCMlTLP GL V C/O WRRlPJC ELMO CORRECTION SV PERFORA TIONS (10102/03) DATE REV BY COMMENTS PRUDHOE BA Y UNrr WELL: Z-03 PERMrr No: "1971310 API No: 50-029-22787-00 SEC 19, T11N, R12E, 976' SNL & 1427' EWL BP Exploration (Alaska) " Jql-/31 ~ ' ¿Wk, -œ'f' ...- .-;. , , , ,J,:, , ..' ,., , "'-0" " " \ -'.." ' Z-O3.MWD GR/ROPE DATA RE-PROCESSING Originally processed: October, 1997 Problem: ROPE data was not depth shifted along with the GR (12'-13' offset). Final data not presentd in LDWG format. Final depth-corrected prints were never created. Re-Processed: December, 2003 Solution: GR depth shifts applied to ROPE data (GR and ROPE data now on depth) , Final data is now presented in LDWG format. Final depth-corrected presentations created. When this data was originally processed in 1997, the ROPE data was not depth shifted along with the GR data (The baseline curve is the Schlumberger GRBCS of 20-Sep- 1997) . The GR and ROPE data were then distributed, and a 12' -13' offset was observed between the GR and ROPE data. The GR depth shifts have now been applied to the ROPE data, and the GRMWD and ROP.MWD data are now on depth with one another. The data is now presented in LDWG format as well. Additionally, final depth-corrected prints were never created or distributed. Digital displays (.PDS files) have now beencreatecland are included on this CD. Hard-copy prints have also been distributed as per LDWG guidelines. Please let me know if you have any questions or concerns about this data. Thank you, Kurt Cooney Schlumberger (SIS) Data Management Engineer (907)-273-1772 cooney l@slb.com RECEIVED MAR 1 2 2004 ,Ajaska Oil & Gas Cons. CoôIntasi\)1'ì ,t.nçrøáge ~- 12/31/03 Schlumberger NO. 3087 Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job# Log Description Date Blueline Color Prints CD H-17A \,,-\-j'IF.;:::> 10558569 MCNL 08/12/03 1 1 J;JLLC)~ K-03A \ '-I '- - é:C! ~ 10560252 SCMT 04/25/03 1 D.S. 07-32A \ c,;¡Ci ~ ðG59 10564482 SCMT 06/10/03 1 D.S. 07-08A)<- -~q 1-1 10559786 SCMT 05/28/03 1 Z-03'\. l'-i '1- ::<;1 40001315 MWDGRIREPROCESSED) OQ/20/97 1 1;..JJ...Jb;;:¡- Z-03 '\. 40001315 MWD GR MD C' ..'~ - . 1 Z-03/ 40001315 MWD GR TVD o¡".æ':7 -I. 1 "':" . D.S.15-28A .-::}r"\~-,~ ... 10715362 MEM PPROF & IPROF 11/21'~:' i 1 , PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage. Alaska 99508 RECEIVED Schlumberger GeoQuest 3940 Arctic Blvd. Suite 300 Anchorage. AK 99503-5711 ATTN: Beth ..' ,,-- -i <7 "!'I 'I 4 ~' ~.: ¡ QC...Ll'UL~ Received ~f::\ \ ~: ,~\. (. ~-'\ e-íYì Date Delivered. ,!.,<:¡,..,""j: ~ ~...""'n,..~ t"^mm~ ,"<,;;,.. '~'".. ..\l..ä::¡I.."..,/!S<"^,, , ,.I¡)ìJ.! .J!,< f')r:"Io¡.~í'~O ..,.,!~o..,,¡;¡~... ~~~,\~ 'I. STATE OF ALASKA RECEIVE:[) ALASKA OIL AND GAS CONSERVATION COMMISSION rES 0 3 2004 REPORT OF SUNDRY WELL OPERATIONs ", r ' .... L" .,.. I~... \J- ',~~I 1\" 1. Operations Performed: Abandon D Alter Casing 0 Change Approved Program 0 2. Operator SuspendD Repair WellO Pull Tubing 0 Operation ShutdownD Plug PerforationsD Perforate New Pool D 4. Current Well Class: Perforate ŒI Waivé\iiCJ10rage Stimulate 0 Time ExtensionD Re-enter Suspended WellD 5. Permit to Drill Number: 197-1310 OtherD Name: BP Exploration (Alaska), Inc. 83.75 8. Property Designation: ADL-0028262 11. Present Well Condition Summary: Development I]] Stratigraphic D 9. Well Name and Number: Z-03 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool Exploratory 0 Service 0 6. API Number 50-029-22787-00-00 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): Total Depth measured 10187 feet true vertical 9210.0 feet Plugs (measured) Junk (measured) None Effective Depth measured 10101 feet None true vertical 9124.2 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 33 113 33.0 - 113.0 1490 470 Liner 679 4-1/2" 12.6# L-80 9508 - 10187 8533.0 - 9210.0 8430 7500 Production 9670 7" 26# L-80 30 - 9700 30.0 - 8724.3 7240 5410 Surface 3072 9-5/8" 47# L-80 32 - 3104 32.0 - 3079.9 6870 4760 Perforation deDth: Measured depth: 9844 - 9857,9864 - 9882,9888 - 9896,9900 - 9906,9910 - 9925,9928 - 9940,9945 - 9962,9962 - 9965,9965 - 9982 True vertical depth: 8867.82 - 8880.78,8887.76 - 8905.71,8911.69 - 8919.67,8923.66 - 8929.64,8933.63 - 8948.6,8951.59 - 8963.56 8968.55 - 8985.51, 8985.51 - 8988.5, 8988.5 - 9005.46 Tubing ( size, grade, and measured depth): 3-1/2" 9.3# L-80 @ 27 9532 Packers & SSSV (type & measured depth): 3-1/2" Baker 5-3 Packer 5" Baker ZXP Liner Top Packer @ @ 9475 9508 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Prior to well operation: Subsequent to operation: Oil-Bbl Gas-Met Water-Bbl Casino Pressure Tubing Pressure 214 0.18 838 1750 277 196 0.17 755 1740 328 Recresentative Dailv Averaae Production or Iniection Data 14. Attachments: 15. Well Class after proposed work: ExploratoryD Develop"mentŒ] ServiceD Copies of Logs and Surveys run- 16. Well Status after proposed work: Operational Shutdown D Oil I]] GasO WAG 0 GINJO WINJD WDSPLO Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A Daily Report of Well Operations" ! 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garry Catron 13ti Title Production Technical Assistant Signature Phone 564-4657 Date 1/30/04 "~8fl ÆÐ@4 ORIGINAL ~Bfl fEB 0 2mll1 Form 10-404 Revised 12/2003 8{;t\l\~~~E["" rE~ 1 B 200¡~ "> Z-03 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 10102/03 DRIFTED WI 2.67in SWEDGE 2.5in DUMMY GUN & S. BAILER. (STRAIGHT) CLEARED TIGHT SPOT FROM 77301 . 7780' SLM. T.D @ 99941 SLM. S. BAILER (EMPTY) 10102/03 Perforate 98441.985T 6 SPF, 98641.98821 6 SPF, 9888'.98961 6 SPF, 99001.99061 6 SPF FLUIDS PUMPED 88LS : TOTAL No Fluids Pumped 0 Page 1 , ... TRæ = 4-112" CAtvERON WELL I-EA D = FMC AC1UATOR= BA KER KB. ELB/ = 83.75' BF. ELB/ = 54.05' KOP= 2573' Max Angle = 35 @ 5780' Datum MD = 9860' Datum lV D = 8BOO'SS Z-03 9-518" CSG, 47#, L-BO, Ð = 8.681" Minimum ID = 2.750" @ 2230' 3-1/2" OTIS SSSV NIPPLE TOP OF 4-112" LNR 3-1/2"TBG, 9.2#, L-BO, .0087 bpf, Ð =2.992" 7" CSG, 26#, L-80, .0383 bpf, Ð = 6.276" ÆRFORA TION SUMMARY RB= LOG: BI-CS ON 09/24/97 ANGLE AT TOP PERF: 4 @ 9910' Note: Refer to Production DB for historcal perf data SIZE SPF INTER\! AL OpnlSqz DATE 2-1/2" 8 9910 - 9925 0 07/19/98 2-1/2" 4 9928 - 9940 0 08/06/99 2-1/2" 8 9945 - 9982 0 07/30/98 4-112" LNR, 12.6#, L-80, .0152 bpf, Ð =3.953" I. SAFElY NOTES: 8) 3-1/2" I-ES SSSV LAND NIP, Ð = 2.75" ST MD 6 3070 5 51 07 4 6607 3 7768 2 8864 1 9399 GA S LIFT MANI:RELS TV D DEV TYPE VL V LA Ta-i 2965 23 CA M DOME RK 4689 33 CA M DOME RK 5936 33 CA M DOME RK 6909 34 CA M DOME RK 7833 30 CA M SlO RK 8341 6 CAM DrvIY RK PORT DATE 16 09/14/03 16 09/14/03 16 ? 16 09/14/03 20 ? 09/14/03 9462' 3-1/2" HES X NIP, ID = 2.750" 9475' 7" X 3-1/2" BKR S-3 PKR, ID = 3.875" 3-1/2"HESXNIP,ID=2.750" 952T DA.TE REV BY CO MM 8\lTS DATE REV BY COMMENTS 09/28/97 JLM ORIGINAL COMPLETON OS/28101 RN/TP CORRECllONS 09/14103 JCM/TLP GLV C/O PRLDHOE BAY U\JIT WELL: Z-03 PERMT I\b: 1971310 APII\b: 50-029-22787-00 SEC 19, T11 N, R12E, 976' SNL & 1427' EWL BP Exploration (Alaska) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser, CommiSsioner THRU' Tom Maunder, P. I. Supervisor DATE: April 21, 2001 FROM' Lou Gdmaldi, SUBJECT' Petroleum Inspector SVS Tests BPX Z-pad Prudhoe Bay Field Saturday, April 21, 2001; I witneSsed the three-month SVS retests on BPX Z pad inthe Western Operating Area of the Prudhoe Bay Field. Merv Liddelow performed the SVS tests today. The test results (one SSV Failure) are noted on the accompanied SVS test spreadsheet. All well houses were in "OK" condition. This was the first exPerience i have had with the new SV control system on Z pad and: found it: to operate quite well The temperatures today were somewhat mild (+15)- and it. remains:to be seen how they will hold up during next winter's cold season:. Wells Z-5 and Z-8 had slow clOsing SSV's (+ 2 minutes), Merv called the AutomatiOn crew and these were being worked on before I left the pad. The pad is being used as a staging area for some pipeline fabrication and has some equiPment and material stored on it. This was kept for the most part neat and orderly. SUMMARY: I witnessed the three-month SVS retests on Z pad in the Prudhoe Bay Field. 20 wells, 40 components, One failure, 2~4% 34 Wellhouse inspections, no problems. Attachments: SVS PBU Z pad 4-21-01 LG.XLS NON-CONFIDENTIAL SVS PBU Z pad 4-21-01 LG Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Lou Grimaldi Submitted By: Lou G. Date: Field/Unit/Pad: Prudhoe Bay Field, Z pad Separator psi: LPS 159 HPS 21fA. pr .............. $ss, V~ Retest W~ll Type . :: i [ I i i i III ' I I I Well Pemit Separ Set ~ Test Test Test Date Oil, WAG, G~J, Number Number PSI PSI Trip Code Code Code Pa~ed GASor~CL~ Z-01 1880660 I59 125 125 P P" ' Z-02A 1960430 Z-03 ' ' 1971310 '159 '125' ' 115~ P "~' ' .... ., , , , . . ,, Z-04 1891230 Z-05 1900780 " 159 '125] 1~5 P 'P .... . ,,, . ,, ~ a ,, . Z-06 1880320 159 125: t25~ e e z-07~ ~ 93 ~ ~ oo Z'-08A 1931280 159 125 120 P ~ " ., ,, .. Z-09 1890850 z-i0 '1891160 ..... z-11 1960720 159 125~ 12~ P P .... i. ... . Z-12 1891020 Z-13 1900940 159 125 12~ P P " ' z_~4~ "~98o~o ........ ~ , , Z-15 1880880 Z'16 1920120 159 125 125 P P , . ,,, ,. , . ., . i , .... Z-17 1891390 159 125 125 P P ~ , , ., ., Z-18 1890960 , Z-19 1920230 ,i . . ,~ , , Z-20 1881000 Z-21 1890420 ~59 lJ5 125 'e '"P ....... Z'-22B ' i~60350 159 125 115 e e Z-23A 1950430 159 125 125 P P z-54 ~890~80 ~59 125 ~2s P' 4 ~,h' b ~ ~(~ "~? "' z-2b" ~88~'590 ' ~59 ~55 'i25 P e .... , , ..... Z-26 1890520 159 125 125 P P Z-27 190'0310 '159 125 125 e P " , ..... Z_28- 1881270 Z-29 1890650 159~ 125 12~ P P ..... , , , Z-30 1900230 159 125 120 P P , ,, . ,,, , . ~Z-31 1881120 Z'3}B 1970340 1~59 125 125! P ' ~e" ' ~ .... I "' ' Z-33A 1890050 , , . .,,,, ,., Z-35 1980930 Z-38' 1980600 "'159 125~" 120 P P , , . . .. . RJF 1/16/01 Page 1 of 2 SVS PBU Z pad 4-21-~ ~_G I Number I Number/ PSII PSI I T~p I Code l Code! CodeI Passed I GASorCYCLE Wells: 20 Components: 40 Failures: 1 Failure Rate: 2.50% Remarks: Z-5 & 8 Long closure times on SSV. RJF 1/16/01 Page 2 of 2 SVS PBU Z pad 4-21-01 LG MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Julie Heusser Commissioner DATE' January 23, 2001 THRU: FROM: Tom Maunder, P. !. Supervisor Jeff Jones, SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit · Z Pad Friday. JanUary. 19. 2001: I traveled to BPX's Z Pad in the Prudhoe Bay Field and witnessed surface safety valve system testing. Merv Liddelow was the BPX representative in charge of testing. As the attached AOG_CC Safety Value System Test Report indicates I witnessed the testing of 21 Wells and 43 components with 6 failures.' The pilot on well Z-03 failed to trip and the pilot on well Z-08 was frozen and once thaWed it passed a retest but the SSV on this well had an unacceptable closure time (12-min.). The SSV on well Z-18 also had an unacceptable closure time (15-min.) and the SSV's on wells Z-22B and Z-24 failed to pressure test. The high failure rate on Z Pad requires it be placed on a 90- day test interval. Mr. Liddlow indicated to me today that all failures have been repaired except the slow SSV closure of wells Z-08A and Z-18. The hydraulic lines on these wells need to be flushed and he has arranged for the maintenance crew to perform the work. Weilhouse inspections were conducted on the 21 wells tested with no exceptions noted. Summary: i witnessed SVS testing at BPX's PBU Z Pad. 21 wells, 43 components, 6 failures. 13.9% failure rate. 21 wellhouse inspections conducted. Attachment: SVS PBU Z Pad 1-19-01 JJ Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Jeff Jones Submitted By: Jeff Jones Field/Unit/Pad: PBF/PBU/Z Pad Separator psi: LPS 159 .... Date: 1/19/01 HPS Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GINJ, Number Number PSI PSI Trip Code Code Code Passed GAS or z-'6~ ' ~'8~0660! ~9 ~2~ ~2~ '"~;.' P ' ' ' Om Z-02A 1960430 .... ~ ........ Z-°3 1971310! 159 125 0 1 P .... OIL , , Z-04 1891230! Z'05 "1'900780' ' '159 ' 125 ' L'120 P '' ' P .... OIL Z-06 1880320 Z-07A 19311001 Z'-08A . , i9312801 ' 159 "125 0 2 " 43 ' '1/2~/i)i .... 0IL Z'09 1890856 ............................ Z-10 1891'160! .............. Z-11 1900720 159 125~ ' 125 P P ....... OiL z- 121 i1891020 ........... z-13 1900940 159 125 125 P P OIL Z-14A 19~0~10 .............. z, ls 1880880 Z-16 '"1~}20120 159 1'25 .....125 ,.Lp ,p ,, ..oiL z-17 1891390 159 125 125 P P OIL Z-!8 .1890960.` .15.9 125,.~ 120 .. p 43. .......... OIL Z- 19 1920230 Z-20 1881000 2'-2~ "' i89b,/2o ' '1 ............. Z-22B 1960350 i59i 125 125 P 4 ....... oIi~' Z-23A 1950430 'Z'-24 .... 1890180' 159 125 130 p 4 OIL~ Z-25 188'1590 '' 159 ..... '12'5 ' 125' ' P ...... P' OIL Z-26 1890520' 159 ' 1'55: ' 125' P '" P ....... 0IL Z-2'~ ...... 1900310 159! ' i25"' ~25 P ' ? ......... iS~L Z-28 1881270. Z-29 189065i)'~ 'i59 125 12o~ P' P ..... OIL Z'-30 ' 1900230 '159 ..... i2~ ~1~: ' ?' ~' Om Z-31 1881120 7~-52B '"19~0340 'i59 ' '125 123 ..... P ' P .... OIL Z-33A 1890050~ 2750 2600 2500 P P P GINJ z,3s ~' "~/80930 ~59 ~25' "~20' 'P' P ' 1/24/01 Page 1 of 2 SVS PBU Z Pad 1-19-01 JJ.xls Well permit Separ Set L/P Test Test Test Date Oil, WAG, GI~J, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCL~ Z-38 1980600 159 125 120 ~P P OIL Wells: , ,,2.1. Components: 4._.___.~3 Failures: ,, , 6. Failure Rate: 13,:9°/d219omv, , . Remarks: ZT08A ss.v f..ai.l, ,ed:. ,12 rn~' ute e!oser, ~- ! 8 ~SSV failed: 1S minute dose..frozen pilot .. thawed & passed retest. 1/24/01 Page 2 of 2 SVS PBU Z Pad 1-19-01 JJ.xls STATE OF ALASKA ALASKA LAND GAS CONSERVATION cor "ISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Pull Tubing [--lAIter Casing [] Repair Well []Other 2. Name of Operator i5. Type [~ well: Development BP Exploration (Alaska)Inc. [] Exploratory 3. Address [] Stratigraphic P.O. Box 196612, Anchorage, Alaska 99519-6612 I I--IService [] Operation Shutdown [] Stimulate [] Plugging [] Perforate 4. Location of well at surface 976' SNL, 1427' EWL, SEC. 19, T11N, R12E, UM At top of productive interval 3735' SNL, 3655' EWL, SEC. 19, T11N, R12E, UM At effective depth 3746' SNL, 1295' EWL, SEC. 19, T11N, R12E, UM At total depth 3750' SNL, 3673' EWL, SEC. 19, T11N, R12E, UM 6. Datum Elevation (DF or KB) KBE = 83.75 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number Z-03 9. Permit Number / Approval No. 197-131 10. APl Number 50- 029-22787 1. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 10187 feet true vertical 9210 feet Effective depth: measured 10101 feet true vertical 9124 feet Casing Length Size Structural Conductor 50' 20" Surface 3074' 9-5/8" Intermediate 9670' 7" Production Liner 679' 4-1/2" Plugs (measured) Junk (measured) Cemented 260 sx Arctic Set (Approx.) 449 sx 'G', 1427 sx CSlII 446 sx Class 'G' 82 sx Class 'G' MD TVD 80' 80' 3104' 3080' 9700' 8725' 9508'- 10187' 8533'-9210' Perforation depth: measured 9910'-9925'; 9928'-9940'; 9945'-9982' true vertical 8934'-8949'; 8952'-8964'; 8796'-8809' Tubing (size, grade, and'measured depth) 3-1/2", 9.3#, L-80 @ 9532' Packers and SSSV (type and measured depth) Packer @ 9475' SSSV @ 223O' 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl SI Casing Pressure Tubing Pressure 227 2146 0 0 199 15. Attachments j 16. Status of well classifications as: [] Copies of Logs and Surveys run j [] Oil [] Gas [] Suspended [] Daily Report of Well Operations i 17. I hereby c,e¢_fy.,~fCat the fore/eToing is trt.)e arid correct to the best of my knowledge Michaelt.Williams .~',-%~J~_.__.~"?~.C~___.~"~f'-,'~.-,.'~.-.~__ Title Technical Assistant IV Prepared By Name/Number: Service Date //X/~/~/~ ~ Form 10-404 Rev. 06/15/88 Submit In Duplicate .~ Z-03 DESCRIPTION OF WORK COMPLETED ADDPERF O8/O6/99 SUMMARY The following additional interval were perforated using 2 1/2" guns, 4 SPF, random orientation and 60° phasing. 9928'- 9940' MD AOGCC Geological Materials Inventory PERMIT 9 7-131 ARCO Log Data Sent PEX-AIT ~'~0~- 10167 10/22/97 7832 ~"~CHLUM PEX-BHC/SL 10/6/97 7833 ~/SCHLUM GR 10/14/97 7841 /,.-~HL~ RST 10/15/97 7857 ~J~MAR MRIL 11/20/97 BHC/SL ~3/~'00 -7000 10/6/97 GAS LIFT-SPIN/ ~E'~/PRES 9750-10040 /c//:'. vt/~':[ ~9 8/19/98 C_~tUCC'L:zPERF ........... 13100-13430 ...... ¢~'~'~.~. t':;~ 'ir-'t'~",} tX/JJJ 12/17/97 JWL c~f300-9700 /~'t ~ ,~ !~tq ¢ 11/26/97 MMS SRVY /-ffP~RRY 9618.34-10118.69 12/10/97 MRIAN ANAL [~UMAR (C) 9710-10177 11/20/97 M~N ANAL ~AR (C) 9710-10177 11/20/97 M~N ANAL *~AR (C) 9710-10177 11/20/97 . PE~ ~'5~0-10040 7/30/98 8/21/98 PE~ ~962-9982 10/14/97. 11/26/97 PE~ ~370-10050 10/18/9Z. 11/26/97 PE~ ~9300-9942 7/19/98 8/21/98 PEX-AIT ~0-7000 10/6/97 PEX-CN ~000-7000 10/6/97 PEX-CN&DT ~000-7000 10/6/97 PEX-SSTVD ~00-6980 10/6/97 PEX-SSTVD ~00-10187 10/6/97 PROD-SP~EM/ ~S 9750-10040 /el fj /~ 7(~ 8/19/98 RST ~0-7600 10/6/97 SR~ ~T ~CHLUM 0-9713. 12/5/97 TIME DOMA~ ~NUMAR (C) 9710-10177 11/20/97 Recieved 10/22/97 10/15/97 10/15/97 10/I 6/97 11/21/97 10/15/97 8/20/98 12/19/97 ' 12/5/97 12/8/97 11/21/97 T 11/21/97 T 11/21/97 T 8/27/98 ' 12/5/97 12/5/97 8/27/98 10/15/97 10/I 5/97 10/15/97 10/15/97 10/15/97 8/20/98 10/15/97 12/8/97 11/21/97 T Box o&% Thursday, September 23, 1999 Page I of 2 Are dry ditch samples required? yes Was the well cored? yes ~ no Aretests required? yes ~ no ?~__no And received? ....... yeses_., no Analysis _description recieved? Received? ,.~-yes~ ..... ~ no Well is in compliance Comments Initial no Thursday, September 23, 1999 Page 2 of 2 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO, 11460 Company: Field: Alaska O1! & Gas Cons Comm Attn: Lorl Taylor 3001 porcupine Dr!ve Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 8/21/98 g~ .o~ Well Job # Log Description Date BL RF Sepia LIS Tape A-41 PERFORATING REcoRD 980727 ' 1 1 A-41 JEWELRY LOG 980727 1 1 B-12A PERFORATING RECORD 980721 1 1 , , , ,, E- 16 IBP SETrlNG RECORD 980 729 I 1 G- 09 PERFORATING RECORD , 9 80 724 1 1 , G-i ~ WHIPSTOCK sETTING RECORD, ':' 980716. 1 G-15 wHIPSTOCK SETTING RECORD 980729 I 1 G-29 JEWELRY LOG 980725 1 1 G.29 PERFORATING RECORD , 980729 I ,1 ,, , , K-6 CHEMICAL CIJ'r TUBING' .. * 980712 ! . 1 K-6 JET cl.n'rER, RECORD , ~, , ,', ,_ 980714. 1 1, R-09 LEA.K DETECTI, ON .... 980713 1 1 .... R- 14 PERFORATION RECORD 980722 I 1 R-18A cHEMICAL CUT RECORD ' 980709 ~ ' 1 R-18B SET 9 5/8' EZSV 980727 1 1 U-2 LEAK DETECTION 980717 I 1 X-04 PERFORATION RECORD 980713 1 1 Z-3 PERFORATING RECORD 980719 1 1 Z-3 PERFORATING RECORDS 980730 1 I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. PetroteCtnlCal Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED AUG 1998 Alaska Oil & Gas Cons. Comm~ ' Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 STATE OF ALASKA - ALASKA ~.,_ AND GAS CONSERVATION COrv,,¢,iSSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: I--JOperation Shutdown ~Stimulate [] Pull Tubing I IAIter Casing 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 2. Name of Operator BP Exploration (Alaska)Inc. 4. Location of well at surface 976' SNL, 1427' EWL, SEC. 19, T11N, R12E, UM At top of productive interval 3735' SNL, 3655' EWL, SEC. 19, T11N, R12E, UM At effective depth 3746' SNL, 1295' EWL, SEC. 19, T11N, R12E, UM At total depth 3750' SNL, 3673' EWL, SEC. 19, T11N, R12E, UM [] Plugging E~ Perforate [] Repair Well []Other Type of well: l~rDevelopment Exploratory [] Stratigraphic [-~ Service 6. Datum Elevation (DF or KB) KBE = 83.75 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number Z-03 9. Permit Number / Approval No. 97-131 10. APl Number 50-029-22787 11. Field and Pool Prudhoe Bay Field / Pool Prudhoe Bay 12. Present well condition summary Total depth: measured 10187 feet true vertical 9210 feet Effective depth: measured 10101 feet true vertical 9124 feet Casing Length Size Structural Conductor 80' 20" Surface 3074' 9-5/8" Intermediate 9670' 7" Production Liner 8829' 4-1/2" Plugs (measured) Junk (measured) Cemented 260 sx Arctic Set (Approx) 449 sx 'G', 1427 sx CSlII 446 sx Class 'G' 82 sx Class 'G' MD TVD 164' 164' 3104' 3080' 9700 8725' 9508'-10187' 8533'-9210' Perforation depth: measured true vertical 9910'-9925',9945'-9982' 8934'-8949',8968'-9005' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 @ 9532' Packers and SSSV (type and measured depth) Packer @ 9475' SSSV @ 223O' RECEIVED JUL 14- 1998 13. Stimulation or cement squeeze summary Intervals treated (measured) See attachment Treatment description including volumes used and final pressure Alaska 011 & 6as Cons. Commission Ar~ch0ra§e 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Prior to well operation: 400 689 0 Subsequent to operation: 1413 1747 0 Casing Pressure Tubing Pressure 0 54 0 254 5. Attachments I16. Status of well classifications as: I--I Copies of Logs and Surveys run I I~ ' I--I ~ I~.q n ........... Od ~ _as ~_~ vus~ended I I uaily Report of Well Operations [ 7. I hereby cj~itifv~hat~th,e fore~,~ng is,tru,e'/~d correct to the best of my knowledge S~gned ~ ' ~M~C~AE~~//~/~ Title Technical Assistant Ill Service Date Prepared By Name/Number: Form 10-404 Rev. 06/15/88 Submit In Duplicate Z-03 DESCRIPTION OF WORK COMPLETED Stimulation Operation O2/27/98 A Mud Acid Stimulation Treatment was performed using the following fluids: SUMMARY Fluid pack well and cool down perfs. Pumped 1st stage of Mud Acid Stim Program consisting of 31bbls 12/10 HCL/Xylene, 46bbls 9/1 Mud Acid, 31 bbls 5%HCL. Over flushed with 100 bbls 2% NH4CI spacer. Park coil above perfs. Pumped 12 bbls of 30ppg wax beads in HEC. Perfs completely blocked after 7 bbls gel/wax out of nozzle. Bled pressure down and tried to pump in slowly but injectivity less than 0.3bpm at 2500psi WHP. Decide to circ out the 5% HCL acid out of the coil and neutralize and attempt to flow the well back through Trico overnight. 2/28/98 RIH with jetting nozzle. Dry tag at 3250 PU and saw o/pull to 20k at 3087'. Start pumping hot water and work down through wax plug. Returns playing havoc with Trico. Large globs of wax seizing up flowmeters and sample ports. Coil stby while Trico flow back acid to clean-up. Decision taken to abort second mud acid stage and RD CTU. Suffered 5 gal oil/acid spill out of vac hose bleed port while driver was pH testing his Icad. Fluid bled back through leaking butterfly valve on vac truck. Notes: With hindsight we overlooked the wax diversion design. Only 52ft net perfs, 2SPF = 104 perf holes. 500lbs wax was too much for this new well. Aisc the particle size and shape was not optimal. The smallest pieces were 2 - 3mm and the largest 2mm by 20mm strips. This is very prone to plating out and jeopardizing the job. CT has been stuck in hole with this before. Dowell are currently checking out the rest of their wax supply. Long term we should consider sourcing an equivalent of BJ "Divert 1" as this appears to be more forgiving for diversion acid stims. & Pad operator of completion of work and to return to MI Injection. Fluids Pumped BBLS. Description 70 Methanol 610 2% KCL water 63 12/10 HCL/Xylene 46 9/1 Mud Acid 31 5% HCL 97 2% NH4CL/Water 917 Total Pumped 15311 VANTAGE PARKWAY WEST, SUITE 350 · HOUSTON, TX 77032 · (281) 590-5494 ° FAX: (281) 590-5495 December 12, 1997 State of Alaska Alaska Oil & Gas Conservation Commission Attn.: Lori Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Ms. Taylor: Enclosed, please find the following items: Nine-track tapes containing requested data for the wells W-03A1 and Z-03 (logged by NUMAR) in LIS format Revised list of mnemonics for NUMAR MRIL data Hard copy of each tape scan A second copy of this letter has been enclosed for your records. Please sign below to acknowledge receipt of this package and send one copy to the following address: BP Exploration (Alaska) Inc. Attn.: Mr. David W. Douglas Petrotechnical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Should you have any questions or concerns, please do not hesitate to call me. Sincerely,~ ""~~5, ! ~,~ ~cv~0 //~//~-~ ~$ffr'o 7¢~. ~~ Dwa~e WeaVer Encl°sure~_ .~ ~ Date RECEiV. .,, ,)~C '! ? ,99'~ 15311 VANTAGE PARKWAY WEST, SUITE 350 · HOUSTON, TX 77032 · (281) 590-5494 · FAX: (281) 590-5495 December 8, 1997 State of Aiaska Alaska Oil & Gas Conse;wation Con,mission Attn_: [..off T~_ylor 3001 Porcupine Dr/ye Anchorage, Alaska 99501 Dear Ms. Taylor: On November 20, I997, NUMAR sent you two nine-track tapes containing data thr We.Il W-03AI arid Well Z-03, respectively. It has recently been determined that the data format on the tapes is incon'ect. Thus, NT~,fAR will. reproduce the tapes. To prevent any future cop~2usion, l~lease return -,h~ old tapes to my attention at your ear'2est convenience. Upon receipt of the old tapes, NUMAR '~ll prepare two new tapes with the co,'iect data format. Tha~Jc you/bt your assistance in this matter. Your prompt response ;viii allow- NUMAR to distribute the corrected tapes in a timely manner. Should you have any questions or concerns, please do not hesitate to call me. Sincerely, . : ~ .- , ,, , Dwayne x;V eaver STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION R EF 6 E IV E D WELL COMPLETION OR RECOMPLETION REPORT AND LO EC -S 199 ' 1. Status of Well Classification of Service Well [~ Oil [] Gas [--I Suspended [] Abandoned [] Service ,~{~;I10ii & Gas Cons. CommJs 2. Name of Operator 7. Permit Number Allchorag8 BP Exploration (Alaska)Inc. 97-131 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22787 4. Location of well at surface . ~ - 9. Unit or Lease Name 976' SNL, 1427' EWL, SEC. 19, T11N, R12E, UM ~-'~.ii,i.:-?'. '~i -~- - Prudhoe Bay Unit At top of productive interval ~ -- -;" '"~-:'~"' i.~"~~i 10. Well Number 3735' SNL, 3655' EWL, SEC. 19, T11N, R12E, UM i~.,~-/~/-~? l~ Z-03 At total depth .~~:i. ~~ ,11. Field and Pool 3750' SNL, 3673' EWL, SEC. 19, T11N, R12E, UM . _ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Desig'~'ati0n:aJr~d Serial No. Pool KBE = 83.75I ADL 028262 12. Date Spudded9/8/97 I 13' Date T'D' Reached t 14' Date C°mp" Susp" °r Aband'115' Water depth' if Offsh°re 116' N°' °f C°mpleti°ns9/23/97 9/28/97 N/A MSLI One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set121. Thickness of Permafrost 10187 9210 FT 10101 9124 FTI [~Yes []NoI (Nipple) 2230' MDI 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, DIP, GR, ES/AlT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES, RFT, Numar, PST 23. CASINGr LINER AND CEMENTING RECORD CASING SE'FrING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 80' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 32' 3104' 12-1/4" 449 sx 'G', 1427 sx CSlII 7" 26# L-80 30' 9700' 8-1/2" 446 sx Class 'G' 4-1/2" 12.6# L-80 9508' 10187' 6" 82 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 2-1/2" Gun Diameter, 2 spf 3-1/2", 9.3#, L-80 9532' 9475' MD TVD MD TVD 9910' - 9925' 8934' - 8949' 9945' - 9982' 8968' - 9005' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 90 Bbls of Diesel 27. PRODUCTION TEST ~ ~ I f~ I ~t, t A I DateoctoberFirst Production23, 1997 IMoth°alGas Lift°f Operation (Flowing, gas lift, etc.) U I~ I L~ 1 I~1 P, L Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure iCALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press, 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9684' 8708' Shublik 9708' 8732' Shublik 'B' 9763' 8787' Shubiik 'C' 9785' 8809' Top of Sadlerochit 9842' 8866' Zone 3 10121' 9144' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify tha~e foregoing is true an,,d correct to the best of my knowledge i ~ ,~- ~'~'~"--"-~ Senior Date Signed 'N~, Title Drilling Engineer, Acting JamesSmith--/(~"-~ Z-03 ,/j 97-131 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number '"' Permit No./Approval No. INSTRUCTIONS GENERAL.' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 10/18/97 Z-03 INITIAL PERF SUMMARY The following initial interval were perforated using 2 1/2" guns, 2 SPF, random orientation and 0\60° phasing. 9910' - 9925' MD 9945'- 9982' MD Performance Enquiry Report Operator BP Exploration Date 18:04, 05 Dec 97 Page 1 Z-03 FIT End-of-well Report The analysis is from - 04:30, 13 Sep 97 - to - 04:30, 13 Sep 97 Programs in Result Table: Z-03 Drill and Complete Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) Depth MDR Hole Size MDR Z-03 Event 04:30, 13 Sep 97 04:30, 13 Sep 97 0 hr 0 min Obtained required level of integrity 14.1 3250.0 8-1/2 Progress Report Facility PB Z Pad Well Z-03 Rig Nabors 18E Page 1 Date 24 October 97 DatedTime 05 Sep 97 06 Sep 97 07 Sep 97 08 Sep 97 09 Sep 97 10 Sep 97 11 Sep 97 12 Sep 97 13 Sep 97 14 Sep 97 18:00-06:00 06:00-13:00 13:00-00:00 00:00-00:30 00:30-02:00 02:00-06:00 06:00-00:00 00:00-00:30 00:30-06:00 06:00-09:00 09:00-10:30 10:30-12:00 12:00-12:30 12:30-20:30 20:30-04:00 04:00-06:00 06:00-12:00 12:00-12:30 12:30-20:30 20:30-21:30 21:30-06:00 06:00-12:00 12:00-12:30 12:30-23:00 23:00-00:00 00:00-00:30 00:30-06:00 06:00-11:30 11:30-12:30 12:30-14:00 14:00-16:00 16:00-18:00 18:00-06:00 06:00-12:00 12:00-12:30 12:30-17:00 17:00-23:30 23:30-00:00 00:00-00:30 00:30-04:30 04:30-06:00 06:00-12:00 12:00-12:30 12:30-16:00 16:00-17:00 17:00-00:00 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-13:00 13:00-15:30 15:30-17:00 17:00-20:00 Duration 12hr 7hr llhr 1/2 hr 1-1/2 hr 4hr 18hr 1/2 hr 5-1/2 hr 3hr 1-1/2 hr 1-1/2 hr 1/2 hr 8hr 7-1/2 hr 2hr 6hr 1/2 hr 8hr lhr 8-1/2 hr 6hr 1/2 hr 10-1/2 hr lhr 1/2 hr 5-1/2 hr 5-1/2 hr lhr 1-1/2 hr 2hr 2hr 12hr 6hr 1/2 hr 4-1/2 hr 6-1/2 hr 1/2 hr 1/2 hr 4hr 1-1/2 hr 6hr 1/2 hr 3-1/2 hr lhr 7hr 1/2 hr 5-1/2 hr 6hr 1/2 hr 1/2 hr 2-1/2 hr 1-1/2 hr 3hr Activity Rig moved 30.00 % Rig moved 30.00 % (cont...) Rig waited · Equipment Held safety meeting Rig waited · Equipment Rig moved 70.00 % Rig moved 70.00 % (cont...) Held safety meeting Rig moved 90.00 % Rig moved 100.00 % (cont...) Held safety meeting Made up BHA no. 1 Held safety meeting Drilled to 360.00 ft Serviced Fluid system Drilled to 500.00 ft Drilled to 863.00 ft Held safety meeting Drilled to 1550.00 ft Pulled out of hole to 200.00 ft Drilled to 2300.00 ft Drilled to 2662.00 ft Held safety meeting Drilled to 3120.00 ft Pulled BHA Held safety meeting Ran Casing to 1000.00 ft (9-5/8in OD) Ran Casing to 3104.00 ft (9-5/8in OD) Held safety meeting Displaced slurry - 92.000 bbl Circulated at 2101.00 ft Displaced slurry - 488.000 bbl Rigged up BOP stack Rigged up BOP stack (cont...) Held safety meeting Tested BOP stack Drilled installed equipment - DV collar Tested Casing - Via string Held drill (Kick (well kill)) Drilled to 3142.00 ft Drilled to 3250.00 ft Drilled to 3830.00 ft (cont...) Held safety meeting Drilled to 4211.00 ft Pulled out of hole to 3104.00 ft Drilled to 4657.00 ft Held safety meeting Drilled to 4877.00 ft Drilled to 5195.00 ft (cont...) Held safety meeting Drilled to 5203.00 ft Pulled out of hole to 0.00 ft Made up BHA no. 3 R.I.H. to 5203.00 ft Facility PB Z Pad Progress Report Well Z-03 Rig Nabors 18E Page Date 2 24 October 97 Date/Time 15 Sep 97 16 Sep 97 17 Sep 97 18 Sep 97 19 Sep 97 20 Sep 97 20:00-00:00 00:00-00:30 00:30-06:00 06:00-09:30 09:30-10:30 10:30-12:00 12:00-12:30 12:30-20:30 20:30-00:00 00:00-00:30 00:30-02:00 02:00-03:30 03:30-06:00 06:00-07:00 07:00-12:00 12:00-12:30 12:30-13:45 13:45-14:00 14:00-00:00 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-18:30 18:30-19:00 19:00-20:00 20:00-00:00 00:00-00:30 00:30-01:30 01:30-02:30 02:30-06:00 06:00-07:00 07:00-07:30 07:30-08:30 08:30-09:30 09:30-10:30 10:30-12:00 12:00-12:30 12:30-13:00 13:00-00:00 00:00-00:30 00:30-06:00 06:00-12:00 12:00-12:30 12:30-17:00 17:00-17:30 17:30-18:00 18:00-20:00 20:00-22:00 22:00-23:00 23:00-00:30 00:30-01:00 01:00-06:00 06:00-08:30 Duration 4hr 1/2 hr 5-1/2 hr 3-1/2 hr lhr 1-1/2 hr 1/2 hr 8hr 3-1/2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 2-1/2 hr lhr 5hr 1/2 hr 1-1/4 hr 1/4 hr 10hr 1/2 hr 5-1/2 hr 6hr 1/2 hr 6hr 1/2 hr lhr 4hr 1/2 hr lhr lhr 3-1/2 hr lhr 1/2 hr lhr lhr lhr 1-1/2 hr 1/2 hr 1/2 hr llhr 1/2 hr 5-1/2 hr 6hr 1/2 hr 4-1/2 hr 1/2 hr 1/2 hr 2hr 2hr lhr 1-1/2 hr 1/2 hr 5hr 2-1/2 hr Activity Drilled to 5542.00 ft Held safety meeting Drilled to 6095.00 ft Drilled to 6222.00 ft (cont...) Pulled out of hole to 5190.00 ft Drilled to 6253.00 ft Held safety meeting Drilled to 6651.00 ft Pulled out of hole to 669.00 ft Held safety meeting Pulled BHA Made up BHA no. 4 R.I.H. to 3400.00 ft R.I.H. to 6661.00 ft (cont...) Drilled to 6893.00 ft Held safety meeting Drilled to 7000.00 ft Held safety meeting Drilled to 7697.00 ft Held safety meeting Drilled to 7950.00 ft Drilled to 8227.00 ft (cont...) Held safety meeting Drilled to 8865.00 ft Circulated at 8665.00 ft Pulled out of hole to 7593.00 ft Drilled to 8821.00 ft Held safety meeting Drilled to 8854.00 ft Circulated at 8854.00 ft Pulled out of hole to 1200.00 ft Pulled out of hole to 171.00 ft Pulled BHA Made up BHA no. 5 R.I.H. to 3050.00 ft Serviced Block line R.I.H. to 8100.00 ft Held safety meeting R.I.H. to 8854.00 ft Drilled to 9144.00 ft Held safety meeting Drilled to 9316.00 ft Drilled to 9493.00 ft Held safety meeting Drilled to 9689.00 ft Circulated at 9689.00 ft Drilled to 9713.00 ft Circulated at 9713.00 ft Circulated at 9713.00 ft Circulated at 9713.00 ft Circulated at 9713.00 ft Pulled out of hole to 8272.00 ft Circulated at 8272.00 ft Circulated at 8272.00 ft Facility PB Z Pad Progress Report Well Z-03 Page Rig Nabors 18E Date 3 24 October 97 Date/Time 21 Sep 97 22 Sep 97 23 Sep 97 08:30-09:30 09:30-10:30 10:30-12:00 12:00-12:30 12:30-13:00 13:00-19:00 19:00-20:00 20:00-21:00 21:00-01:30 01:30-02:30 02:30-03:30 03:30-04:00 04:00-05:00 05:00-05:30 05:30-06:00 06:00-09:30 09:30-10:00 10:00-12:00 12:00-12:30 12:30-16:30 16:30-17:30 17:30-19:30 19:30-20:00 20:00-21:00 21:00-21:30 21:30-22:00 22:00-23:00 23:00-23:30 23:30-00:00 00:00-00:30 00:30-01:00 01:00-02:00 02:00-02:30 02:30-03:00 03:00-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-07:00 07:00-08:30 08:30-12:00 12:00-12:30 12:30-15:00 15:00-15:30 15:30-19:30 19:30-20:30 20:30-21:00 21:00-21:30 21:30-23:30 23:30-01:00 01:00-02:00 02:00-06:00 06:00-08:30 08:30-10:00 Duration lhr lhr 1-1/2 hr 1/2 hr 1/2 hr 6hr lhr lhr 4-1/2 hr lhr lhr 1/2 hr lhr 1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 2hr 1/2 hr 4hr lhr 2hr 1/2 hr lhr 1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 1/2 hr lhr 1/2 hr 1/2 hr lhr lhr lhr 1/2 hr 1/2hr 1-1/2 hr 3-1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 4hr lhr 1/2hr 1/2 hr 2hr 1-1/2 hr lhr 4hr 2-1/2 hr 1-1/2 hr Activity Pulled out of hole to 7215.00 ft R.I.H. to 9681.00 ft Circulated at 9681.00 ft Held safety meeting Circulated at 9681.00 ft Laid down 9681.00 ft of 5in OD drill pipe Pulled BHA Rigged up Wireline units Conducted electric cable operations Rigged down Wireline units Rigged up Top ram Tested Top ram Rigged up Casing handling equipment Held safety meeting Ran Casing to 250.00 ft (7in OD) Ran Casing to 3100.00 ft (7in OD) Circulated at 3100.00 ft Ran Casing to 5200.00 ft (7in OD) Held safety meeting Ran Casing to 6910.00 ft (7in OD) Ran Casing to 9700.00 ft (7in OD) Circulated at 9700.00 ft Pumped Water spacers - volume 5.000 bbl Serviced High pressure lines Pumped Lo/Hi vis combination spacers - volume 70.000 bbl Mixed and pumped slurry - 196.000 bbl Displaced slurry - 369.000 bbl Tested Casing Rigged up Casing handling equipment Held safety meeting Rigged down Casing handling equipment Installed Casing hanger & seal assembly running tool Tested Seal assembly Circulated at 3104.00 ft Rigged up Top ram Rigged up High pressure lines Tested BOP stack Rigged up Kelly Tested Kelly Made up BHA no. 6 Singled in drill pipe to 4561.00 ft Held safety meeting Singled in drill pipe to 6000.00 ft Held safety meeting Singled in drill pipe to 9615.00 ft Tested Casing Held drill (Kick while drilling) Held drill (Kick (well kill)) Drilled installed equipment - Float shoe Drilled to 9736.00 ft Circulated at 9736.00 ft Drilled to 9790.00 ft Drilled to 9850.00 ft Circulated at 9850.00 ft Facility PB Z Pad Progress Report Well Z-03 Page 4 Rig Naborsl8E Date 24October97 Date/Time 24 Sep 97 25 Sep 97 26 Sep 97 27 Sep 97 28 Sep 97 10:00-22:30 22:30-23:00 23:00-23:30 23:30-00:00 00:00-00:30 00:30-03:30 03:30-04:00 04:00-05:00 05:00-06:00 06:00-11:00 11:00-19:00 19:00-01:30 01:30-02:30 02:30-03:30 03:30-04:30 04:30-06:00 06:00-12:00 12:00-12:30 12:30-14:00 14:00-15:00 15:00-19:00 19:00-00:00 00:00-00:30 00:30-03:00 03:00-03:30 03:30-05:00 05:00-06:00 06:00-21:00 21:00-22:00 22:00-23:00 23:00-00:00 00:00-00:30 00:30-06:00 06:00-07:00 07:00-08:00 08:00-12:00 12:00-12:30 12:30-14:00 14:00-17:00 17:00-18:00 18:00-18:30 18:30-19:30 19:30-00:00 00:00-00:30 00:30-01:30 01:30-04:30 04:30-06:00 06:00-07:00 07:00-08:30 08:30-10:00 10:00-11:00 Duration 12-1/2 hr 1/2 hr 1/2 hr 1/2hr 1/2 hr 3hr 1/2 hr lhr lhr 5hr 8hr 6-1/2 hr lhr lhr lhr 1-1/2 hr 6hr 1/2 hr 1-1/2 hr lhr 4hr 5hr 1/2hr 2-1/2 hr 1/2 hr 1-1/2 hr lhr 15 hr lhr lhr lhr 1/2 hr 5-1/2 hr lhr lhr 4hr 1/2 hr 1-1/2 hr 3hr lhr 1/2 hr lhr 4-1/2 hr 1/2 hr lhr 3hr 1-1/2 hr lhr 1-1/2 hr 1-1/2 hr lhr Activity Drilled to 10187.00 ft Pulled out of hole to 9650.00 ft R.I.H. to 10187.00 ft Circulated at 10187.00 ft Held safety meeting Pulled out of hole to 633.00 ft Pulled BHA Rigged up Logging/braided cable equipment Conducted electric cable operations Conducted electric cable operations (cont...) Conducted electric cable operations Conducted electric cable operations Rigged down Wireline units Rigged up Casing handling equipment Ran Liner to 657.00 ft (4-1/2in OD) Installed Tubular strings Ran Drillpipe on landing string to 9700.00 ft Held safety meeting Circulated at 10187.00 ft Mixed and pumped slurry - 23.000 bbl Circulated at 10101.00 ft Laid down 6400.00 ft of 3-1/2in OD drill pipe Held safety meeting Laid down 9507.00 ft of 3-1/2in OD drill pipe Tested Casing Rigged up Wireline units Conducted electric cable operations Conducted electric cable operations Rigged down Wireline units Removed Bore protector Ran Tubing to 950.00 ft (3-1/2in OD) Held safety meeting Ran Tubing to 6440.00 ft (3-1/2in OD) Ran Tubing to 7286.00 ft (3-1/2in OD) Installed SCSSSV nipple assembly Ran Tubing to 9532.00 ft (3-1/2in OD) Held safety meeting Space out tubulars Reverse circulated at 9532.00 ft Set Production packer at 9474.00 ft with 3600.0 psi Tested Casing Installed BOP test plug assembly Rigged down BOP stack Held safety meeting Rigged down BOP stack Installed Xmas tree Retrieved BOP test plug assembly Tested Tubing Freeze protect well - 90.000 bbl of Diesel Freeze protect well - 90.000 bbl of Diesel Installed Hanger plug SPF~-~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU / Z-03 500292278700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 3/97 DATE OF SURVEY: 092397 MAGNETIC MULTI-SHOT SURVEY JOB NUMBER: AK-EI-70277 KELLY BUSHING ELEV. = 83.75 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS DIRECTION DEGREES DG/10 TOTAL RECTANGULAR COORDINATES VERT. 0 NORTH/SOUTH EAST/WEST SECT. 9618.34 8642.82 8559.07 4 39 S 53 9706.26 8730.43 8646.68 4 57 S 52 9801.92 8825.77 8742.02 4 28 S 54 9897.75 8921.32 8837.57 4 13 S 54 9991.71 9015.05 8931.30 3 43 S 50 .92 E .97 E .43 E .27 E .78 E 00 2748.44S 2213.38E 3528.87 36 2752.83S 2219.29E 3536.00 52 2757.48S 2225.63E 3543.60 25 2761.72S 2231.54E 3550.61 60 2765.68S 2236.71E 3556.94 10086.67 9109.80 9026.05 3 52 S 48.50 E .23 10118.69 9141.75 9058.00 3 46 S 47.70 E .37 2769.75S 2241.50E 3563.13 2771.18S 2243.09E 3565.24 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 3565.24 FEET AT SOUTH 38 DEG. 59 MIN. EAST AT MD = 10118 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 141.02 DEG. TIE-IN SURVEY AT 9,618.34' MD LAST SURVEY STATION AT 10,118.69' MD ORIGINAL SPF .... Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU / Z-03 500292278700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 3/97 DATE OF SURVEY: 092397 JOB NUMBER: AK-EI-70277 KELLY BUSHING ELEV. = 83.75 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9618.34 8642.82 8559.07 10118.69 9141.75 9058.00 2748.44 S 2213.38 E 975.52 2771.18 S 2243.09 E 976.94 1.42 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPF~Y-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE SHARED SERVICES DRILLING PBU / Z-03 500292278700 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/ 3/97 INTERPOLATED VALUES FOR EVEN 100 DATE OF SURVEY: 092397 JOB NUMBER: AK-EI-70277 KELLY BUSHING ELEV. = 83.75 FT. OPERATOR: BP EXPLORATION FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE 9618.34 8642.82 8559.07 2748.44 S 2213.38 E 975.52 9659.41 8683.75 8600.00 2750.40 S 2216.07 E 975.66 9759.77 8783.75 8700.00 2755.57 S 2222.95 E 976.02 9860.08 8883.75 8800.00 2760.10 S 2229.28 E 976.33 VERTICAL CORRECTION .14 .37 .30 9960.34 8983.75 8900.00 2764.39 S 2235.14 E 976.59 10060.55 9083.75 9000.00 2768.58 S 2240.18 E 976.80 10118.69 9141.75 9058.00 2771.18 S 2243.09 E 976.94 .26 .21 .13 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMTTM CURVATURE) POINTS SURVEY REPORT Client: SSD Field: Prudhoe Bay Well Name: Z-03 APl number: 50-029-22787 Job number: 40001315 Rig: 18-E County: NSB State: AK Surve,/Calculations Calc method for positi{ Minimum Curvature Calc method for DLS: Mason & Taylor ,Depth references Permanent datum MSL 0 FT Depth reference KB 83.75 FT GL above Permanent 53.05 FT KB above Permanent 83.75 FT DF above Permanent 82.75 FT Vertical section od(~in Latidude (+N/S-): 0 Departure (+E/W-): 0 Azim from rotary table to target: 141.02 Schlumber~ler ANADRILL Survey Report I Seq Measured Incl # Depth angle (ft) (deg) 1 0.00 0.00 2 155.11 0.87 3 252.06 1.00 4 342.80 1.55 5 434.88 2.02 6 535.23 1.96 7 617.98 2.07 8 711.81 1.74 9 802.32 1.68 10 895.95 1.75 11 989.84 2.03 12 1080.01 2.02 13 1173.87 2.31 14 1267.99 2.33 15 1360.60 2.41 16 1453.86 2.48 17 1549.62 2.52 18 1639.91 2.95 19 1732.78 3.10 20 1827.55 3.13 21 1921.33 3.12 22 2015.48 2.96 23 2107.36 4.01 24 2201.23 4.09 25 2295.80 4.15 26 2386.69 4.64 27 ~ 2480.37 6.23 28 2572.59 9.13 29 2664.50 11.26 30 2759.16 13.65 Azimuth angle (de~) 0.00 120.87 113.68 106.36 112.60 124.18 132.13 166.27 182.50 182.26 184.82 186.76 183.58 184.34 182.93 186.68 188.97 184.88 183.04 186.69 187.11 184.44 172.99 173.34 172.45 154.69 150.76 148.19 145.53 142.79 degrees Course length 0.00 155.11 97.00 90.70 92.10 Spud Date: 8-Sep-97 Last survey date: 19-Sep-97 Total accepted survey: 119.00 MD of first survey: 0.00 FT MD of last survey: 9618.34 FT 0.00 100.30 82.80 93.80 90.50 93.70 93.80 90.20 93.90 94.10 92.60 93.30 95.70 90.30 92.90 94.80 93.70 94.20 91.90 93.80 94.60 90.90 93.70 92.20 91.90 94.70 Geomac~netic data Magnetic Model: BGGM 1996 Version Magnetic Date: 8-Sep-97 Magnetic field strengtl- 1146.59 HCNT Magnetic dec (+E/W-) 28.10 degrees Magnetic Dip: 80.66 degrees MWD Survey Reference Cdteda Reference G: 1002.68 milliG Reference H: 1146.59 HCNT Reference Dip: 80.66 degrees Tolerance G: 3.00 milliG Tolerance H: 6.00 HCNT Tolerance Dip: 0.30 degrees Correction Magnetic dec (+E/W-) 28.10 degrees Grid convergence (+E 0.00 degrees Total az corr (+E/W-): 28.10 degrees TVD Vedical Displacement Total ~ Azm depth section +N/S- +E/W- displacement 0.00 0.00 0.00 0.00 0.00 0.00 155.09 1.11 -0.60 1.01 1.18 120.90 252.08 2.55 -1.32 2.42 2.76 118.69 342.76 4.26 -1.99 4.32 4.75 114.71 434.81 6.71 -2.96 7.01 7.61 112.91 535.05 9.91 -4.61 10.06 11.07 114.60 617.80 12.74 -6.40 12.34 13.91 117.42 711.55 15.71 -8.92 13.94 16.55 122.63 802.01 17.94 -11.58 14.21 18.33 129.20 895.67 20.05 -14.39 14.09 20.14 135.60 989.42 22.32 -17.47 13.89 22.32 141.51 1079.56 24.58 -20.64 13.57 24.70 146.68 1173.40 27.13 -24.18 13.25 27.57 151.26 1267.42 29.92 -27.98 12.99 30.85 155.09 1359.94 32.74 -31.80 12.75 34.26 158.15 1453.16 35.61 -35.76 12.42 37.86 160.85 1548.76 38.47 -39.90 11.85 41.62 163.46 1638.96 41.47 -44.17 11.34 45.60 165.60 1731.73 45.06 -49.06 11.00 50.28 167.36 1826.39 48.77 -54.19 10.57 55.21 168.97 1919.95 52.33 -59.26 9.95 60.09 170.47 2014.02 55.88 -64.23 9.45 64.92 171.63 2105.75 60.33 -69.79 9.66 70.45 172.12 2199.32 65,94 -76.36 10.45 77.08 172.21 2293.67 71,71 -83.11 11.30 83.87 172.26 2384.30 77.89 -89.91 12.70 90.81 171.96 2477.58 86.37 -98.01 16.18 99.34 170.63 2568.95 98.56 -108.60 22.48 110.90 168.31 2659.39 114.74 -122.19 31.40 126.16 165.59. 2751.86 135.13 -138.71 43.40 145.34 162.63 ORIGINAL DLS (deg/ lOOf) Srvy Tool J tool quality 0.00 TIP 0.56 MWD 6-axis 0.18 MWD 6-axis 0.63 MWD 6-axis 0.55 MWD 6-axls 0.41 MWD 6-axis 0.36 MWD 6-axis 1.24 MWD 6-axis 0.54 MWD 6-axis 0.07 MWD 6-axis 0.31 MWD 6-axis 0.08 MWD 6-axis 0.33 MWD 6-axis 0.04 MWD 6-axis 0.11 MWD 6-axis 0.19 MWD 6-axis 0.11 MWD 6-axis 0.52 MWD 6-axis 0.19 MWD 6-axis 0.21 MWD 6-axis 0.03 MWD 6-axis 0.23 MWD 6-axis 1.36 MWD 6-axis 0.09 MWD 6-axis 0.09 MWD 6-axis 0.84 MWD 6-axis 2.19 MWD 6-axis 3.17 MWD 6-axis 2.37 MWD 6-axis 2.60 MWD 6-axis Page 1 Schlumber~ler ANADRILL Survey Report Seq Measured Incl Azimuth Course TVD Vertical Displacement Total at Azrn DLS Srvy Tool # Depth angle angle length depth section +N/S- +E/W- displacement (deg/ tool quality (ft) (de~) (de~l) (ft) (ft) (ft). (ft) (ft) (ft) (dec~) 100I) b/f Re b/pe 31 2850.69 16.00 141.70 91.50 2840.31 158.53 -157,21 57.74 167.48 159.83 2.59 MWD 6-axis 32 2943.74 17.86 143.06 93.00 2929.27 185.60 -178.67 74.25 193.49 157,43 2.05 MWD 6-axis 33 3059.31 20.81 141.43 115.60 3038..34 223.86 -208.91 97.71 230.63 154.93 2.60 MWD 6-axis 34 3193.74 24.67 140.27 134.40 3162.27 275.80 -249.16 130.53 281.28 152.35 2.89 MWD 6-axis 35 3286.48- 28.72 140.45 92.80 3245.16 317.48 -281.25 157.13 322.17 150.81 4.36 MWD 6-axis 36 3382.29 31.94 140.97 95.80 3327.84 365,85 -318.69 187.76 369.89 149.50 3.38 MWD 6-axis 37 3478.07 33.72 141.76 95.80 3408.34 417.78 -359.29 220.15 421.37 148.50 1.91 MWD 6-axis 38 3573.87 34.25 144.37 95.80 3487.77 471.28 -402.10 252.29 474.70 147.89 1.61 MWD 6-axis 39 3668.68 34.06 145.31 94.80 3566.22 524.39 -445.62 282.93 527.85 147.59 0.57 MWD 6-axis 40 3764.86 34.39 142.99 96.20 3645.77 578.41 -489.47 314.62 581.86 147.27 1.39 MWD 6-axis 41 3859.38 34.02 141.37 ,~94.50 3723.93 631.51 -531.44 347.17 634.79 146.84 1.03 MWD 6-axis 42 3954.82 33.40 136.96 95.40 3803.30 684.40 -571.51 381.74 687.27 146.26 2.64 MWD 6-axis 43 4049.93 33.02 136.50 95.10 3882.86 736.35 -609.45 417.42 738.70 145.59 0.49 MWD 6-axis 44 4143.89 32.67 135.11 94.00 3961.84 787.11 -646.00 452.96 788.98 144.96 0.89 MWD 6-axis 45 4242.01 32.89 135.64 98.10 4044..32 839.98 -683.85 490.22 841.41 144.36 0.45 MWD 6-axis 46 4336.66 33.26 134.85 94.70 4123.67 891.40 -720.58 526.58 892.48 143.84 0.70 MWD 6-axis 47 4432.35 33.30 135.05 95.70 4203.68 943.62 -757.68 563.74 944.40 143.35 0.18 MWD 6-axis 48 4527.75 33.36 137.52 95.40 4283.39 995.85 -795.57 599.95 996.43 142.98 1.38 MWD 6-axis 49 4623.92 32.26 139.09 96.10 4364.16 1047.86 -834.44 634.59 1048.33 142.75 1.46 MWD 6-axis 50 4719.07 32.07 138.08 95.20 -!.,!.!..!..751098.49 -872.46 668.11 1098.88 142.56 0.59 MWD 6-axis 51 4814.41 32.18 138.47 95.30 4525.46 1149.11 -910.29 701.82 1149.43 142.37 0.25 MWD 6-axis 52 4909.76 32.00 137.62 95.40 4606.28 1199.72 -947.99 735.70 1199.97 142.19 0.54 MWD 6-axis 53 5002.56 31.85 138.55 92.80 4685.04 1248.73 -984.48 768.50 1248.92 142.02 0.54 MWD 6-axis 54 5096.01 32.85 144.21 93.40 4763.96 1298.65 -1023.50 799.66 1298.84 142.00 3.44 MWD 6-axis 55 5135.79 32.86 143.61 39.80 4797.40 1320.22 -1040.94 812.38 1320.42 142.03 0.82 MWD 6-axis 56 5221.93 32.73 143.42 86.10 4869.78 1366.81 - 1078.43 840.12 1367.04 142.08 0.20 MWD 6-axis 57 5314.40 32.56 143.42 92.50 4947.66 1416.66 -1118.49 869.87 1416.93 142.13 0.18 MWD 6-axls 58 5407.48 32.44 142.41 93.10 5026.18 1466.66 -1158.38 900.04 1466.94 142.15 0.59 MWD 6-axis 59 5501.52 33,76 142.27 94.00 5104.93 1517.98 -1199.03 931.40 1518.28 142.16 1.41 MWD 6-axis 60 5593.73 33.46 140.88 92.20 5181.71 1569.01 -1239.02 963.09 1569.31 142.14 0.90 MWD 6-axls 61 5687.88 34.62 14'i.15 94.20 5259.77 1621.74 -1280.00 996.28 1622.03 142.10 1.24 MWD 6-axis '62 5780.46 35.22 141.53 92.60 5335.70 1674.74 -1321.37 1029.42 1675.03 142.08 0.69 MWD 6-axis 63 5871.75 34.92 140.65 91.30 5410.42 1727.20 -1362.17 1062.39 1727.48 142.05 0.65 MWD 6-axis 64 5964.59 34.70 139.34 92.80 5486.62 1780.16 -1402.72 1096.48 1780.42 141.99 0.83 MWD 6-axis 65 6055.77 34.42 139.35 91.20 5561.72 1831.88 -1441.94 1130.21 1832.10 141.91 0.31 MWD 6-axis 66 6148.20 34~.43 138.90 92.40 5637.94 1884.08 -1461.42 1164.42 1884.27 141.83 0.24 MWD 6-axis 67 6239.60 34.31 138.07 91.40 5713.39 1935.63 -1520.07 1198.60 1935.78 141.74 0.51 MWD 6-axis 68 6332.18 34.06 138.50 92.60 5789.99 1987.60 -1558.91 1233.22 1987.72 141.65 0.36 MWD 6-axis 69 6424.50 33.09 137.84 92.30 5866.89 2038.58 -1596.94 1267.27 2038.67 141.57 1.13 MWD 6-axis 70 6517.49 32.99 137.62 93,00 5944.85 2089.20 -1634.44 1301.39 2089.26 141.47 0.16 MWD 6-axis 71 6599.65 32.45 136.64 82.20 6013.95 2133.60 -1667.16 1331.55 2133.65 141.39 0.93 MWD 6-axis 72 6694.52 32.46 135.73 94.80 6093.94 2164.29 -1703.85 1366.79 2164.31 141.26 0.51 MWD 6-axis 73 6787.38 32.30 136.37 92.90 6172.40 2233.85 -1739.67 1401.32 2233.86 141.15 0.44 MWD 6-axis 74 6879.36 33.15 142.35 92.00 6249.82 2283.52 -1777.41 1433.63 2283.52 141.11 3.64 MWD 6-axis 75 6971.56 33.94 146.59 92.20 6326.67 2334.34 -1818.87 1463.18 2334.35 141.19 2.66 MWD 6-axis 76 7065,25 33.63 146.07 93.70 6404.55 2386.22 -1862.25 1492.05 2386.25 141.30 0.44 MWD 6-axis 77 7157.55 33,32 146.89 92.30 6481.54 2436.90 -1904.70 1520.15 2436.95 141.41 0.58 MWD 6-axis 78 7250.37 32.88 147.22 92.80 6559.28 2487.29 -1947.22 1547.72 2487.39 141.52 0.51 MWD 6-axis 79 7344.26 32.64 146,61 93,90 6638.24 2537.84 -1989.79 1575.46 2537.98 141.63 0.43 MWD 6-axis 80 7436.49 32.76 146.27 92.20 6715.83 2587.43 -2031.30 1602.99 2587.62 141.72 0.22 MWD 6-axis 81 7529.17 33.10 146.20 92.70 6793.64 2637.61 -2073.20 1630.99 2637.86 141.81 0.37 MWD 6-axis 82 7621.68 33.40 146.07 92.50 6870.99 2688.12 -2115.32 1659.24 2688.43 141.89 0.33 MWD 6-axis 83 7715.95 33.80 146.44 94.20 6949.46 2740.03 -2158.67 1688.20 2740.41 141.97 0.46 MWD 6-axis 84 7840.67 33.64 142.57 124.80 7053.27 2809.16 -2215.05 1728.41 2809.60 142.03 1.69 MWD 6-axis 85 7934.55 34.01 149.2.9 93.80 7131.19 2861.35 -2256.44 1760.23 2861.81 142.04 0.43 MWD 6-axis 86 8028.65 34.43 143.05 94.20 7209.09 2914.31 -2298.58 1792.33 2914.78 142.05 0.65 MWD 6-axis 87 8122.09 32.69 140.31 93.40 7286.92 2965.92 -2339.11 1824.30 2966.40 142.05 2.49 MWD 6-axis 88 8215.06 31.29 140.00 93.00 7365.79 3015.18 -2376.94 1855.87 3015.64 142.02 1.52 MWD 6-axis Page 2 Schlumber~ler ANADRILL Survey Report Seq Measured Incl Azimuth Course 'rVD Vertical Displacement Total atAzm DES Srvy Tool # Depth angle angle length depth section +N/S- +E/W- displacement (deg/ tool quality (ft) (de~l) (dec~) (ft) (ftI (ft/ (ft) (ftI (ftI (deg) 100fI ~ ~ 89 8307.38 31.06 138.76 92.30 7444.77 3062.94-2413.21 1886.96 3063.37 141.98 0.72 MWD 6-axis 90 8401.45 31.50 139.30 94.10 7525.19 3111.77 -2450.12 1918.98 31'12.16 141.93 0.54 MWD 6-axis- 91 8495.94 32.02 139.12 94.40 7605.45 3161.43 -2487.73 1951.45 3161.80 141.89 0.56 MWD 6-axis- 92 8589.10 32.22 ' 140.49 93.20 7684.39 3210.97 -2525.58 1983.43 3211.31 141.86 0.83 MWD 6-axis' 93 8683.03 32.79 139.51 93.90 7763.58 3261.42 -2564.23 2015.87 3261.75 141.83 0.83 MWD 6-axis 94 8778.03 33.40 139.37 95.00 7843.17 3313.28 -2603.64' 2049.59 3313.57 141.79 0.64 MWD 6-axis 95 8809.65 32.17 138.56 31.60 7869.73 3330.38 -2616.56 2060.82 3330.67 141.78 4.13 MWD 6-axis 96 8842.11 . 30.10 136.89 32.50 7897.55 3347.15 -2629.00 2072.11 3347.43 141.76 6.92 MWD 6-axis 97 8873.83 28.31 135.96 31.70 7925.22 3362.57 -2640.21 2082.76 3362.83 141.73 5.81 MWD 6-axis 98 8905.86 26.62 134.54 32.10 7953.70 3377.30 -2650.73 2093.18 3377.54 141.70 5.69 MWD 6-axis 99 8938.00 25.27 133.44 32.10 7982.56 3391.23 -2660.48 2103.29 3391.45 141.67 4.46 MWD 6-axis 100 8967.70 24.25 130.26 ,~29.70 8009.53 340321 -2668.78 2112.54 3403.71 141.64 5.56 MWD 6-axis 101 8999.65 22.'81 128.23 32.00 8038.87- 3416.02 -2676.86 2122.43 3416.19 141.59 5.21 MWD 6-axis 102 9032.19 21.83 125.75 32.50 8068.94 3427.99 -2684.29 2132.29 3428.13 141.54 4.20 MWD 6-axis 103 9062.02 20.72 123.04 29.80 8096.71 3438,35 -2690.39 2141.21 3438.46 141.48 4.97 MWD 6-axis ' 104 9092.36 19.41 121.38 30.40 8125.26 3448.22 -2695.95 2150.03 3448.30 141.43 4.67 MWD 6-axis 105 9124..13 17.86 120.85 31.70 8155.30 3457.74 -2701.19 2158.71 3457.81 141.37 4.93 MWD 6-axis 106 9155.66 15.99 120.33 31.60 8185.53 3466.36 -2705.86 2166.63 3466.41 141.32 5.94 MWD 6-axis 107 9185.21 14.54 119.20 29.50 8213.99 3473.60 -2709.72 2173.37 3473.63 141.27 5.01 MWD 6-axis 108 9215.72 12.91 120.99 30.50 8243.62 3480.35 -2713.34 2179.63 3480.38 141.23 5.52 MWD 6-axis 109 9247.17 11.69 127.06 31.50 8274.39 3486.76 -2717.08 2185.19 3486.77 141.19 5.65 MWD 6-axis 110 9278.64 10.33 135.81 31.40 8305.22 3492.65 -2721.02 2189.69 3492.66 141.18 6.83 MWD 6-axis 111 9310.17 9.08 143.57 31.60 8336.37 3497.96 -2725.06 2193.15 3497.98 141.17 5.73 MWD 6-axis 112 9339.82 7.63 149.22 29.60 8365.65 3502.24 -2728.63 2195.54 3502,26 141.18 5.61 MWD 6-axis 113 9371.58 6,32 151.02 31.80 8397.21 3506.06 -2731.97 2197,47 3506,07 141.19 4.18 MWD 6-axis 114 9403,91 5,90 148.48 32.30 8429,33 3509.45 -2734.94 2199,2 3509.47 141,2 1.54 MWD 6-axis 115 9434.52 5.56 139.82 30.60 8459.78 3512.49 -2737.41 2200.98 3512.51 141.2 3.04 MWD 6-axis 116 9466.11 5.66 135.49 31.60 8491.23 3515.58 -2739.69 2203.06 3515.59 141.2 1.37 MWD 6-axis 117 9496.67 5.83 133.57 30.60 8521.67 3518.62 -2741.84 2205.24 3518.63 141.19 0.83 MWD 6-axis 118 9559.56 4.64 127.55 62.90 8564.31 3524.26 -2745.59 2209.57 3524.27 141.17 2.09 MWD 6-axis 119 9618.34 4.65 126.08 58.70 8642.82 3528.87 -2748.44 2213.38 3528.88 141.15 0.19 MWD 6-axis 120 9713.00 4.65 126.08 94.70 8737.21 3536.29 -2752.90 2219.58 3536.29 141.12 0.00 Extrapolated Page 3 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11598 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 11/26/97 -1:2.'-' 090 Well Job # Log Description Date BL RF Sepia LIS Tape C-01 0 PRODUCTION PROFILE 971 010 I 1 ,_ E- 14. WHIPSTOCK SETTING RECORD 971 007 I 1 , , G~03A , STATIC TEMP & PRESS SURVEY 970929 I 1 H-08 · CORRELATION LOG GPJCCL 9 71 019 I 1 H-10 ,---- [~L~ d..~. TUBING PUNCH RECORD 971 009 I 1 H- 10 ~ ~ BRIDGE PLUG SET RECORD 9 71 01 3 I 1 -- J-06 , / TEMPERATURE-PRESSURESURVEY 971011 1 ,. 1 ,.M-30 ~.%.t ~ ,// INJECTION PROFILE 970915 I 1 N-22 · PRODUCTION PROFILE LOG 971 009 1 1 P-22 , STATIC PRESSURE SURVEY 971 01 0 1 1 R-16 ~ WHIPSTOCK RECORD 971017 I 1 S-42 0 LEAK DETECTION LOG 971012 1 1 W-06A * PERFORATION RECORD 971017 I 1 W-23 · JEWELRY LOG CCL/GR 970901 I 1 Z-03 , PERFORATING RECORD 97101 4 I 1 Z-03 , JEWELRY LOG 971 014 I 1 Z-03 , PERFORATING RECORD 971 018 I I -/-'/- ?'"/¢ PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 15311 VANTAGE PARKWAY WEST, SUITE 350 · HOUSTON, TX 77032 ° (281) 590-5494 ° FAX: (281) 590-5495 November 20, 1997 State of Alaska Alaska Oil & Gas Conservation Commission Attn.: Lori Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Ms. Taylor: Enclosed, please · Nine-track tape containing requested data for the Well Z-03 (logged by NUMAR) in LIS · List of mnemonics for NUMAR MSHL data · Hard copy of tape scan · Color logs A second copy of this letter has been enclosed for your records. Please gign below to acknowledge receipt of this package and send one copy to the following address: BP Exploration (Alaska) ~c. Attn.: Mr. David W. Douglas ' Petrotechnical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Should you have any questions or concerns, please do not hesitate to call rne. Sincerely, Dwayne Weaver Enclosures Signamre,(~ Date NOV ?- 1 '~997 ~'qas.'~a Ot .& Gas Cons. C0mmissi0n ~,n,'.h, era.qer LIST OF MNEMONICS FOR MRIL DATA: · MPHI - MRIL Porosity · MPHE - MRIL Porosity (AWS designation) · PHIMD - MRIL porosity (decimal) from Numar MR/AN processing. · MBVI - MRIL bulk volume irreducible, max(SBVI, CBVI) · BVIMD - MRIL bulk volume irreducible (decimal) from Numar MRIAN processing. · MFFI - Free fluid index (does not have T1 or Hydrogen Index correction) · FFIMD - Free fluid index (decimal) from Numar MRIAN processing. · MBVM - Bulk Volume Moveable Fluid (MFFI corrected for Ti and Hydrogen Index) · MCBW - Volmne of clay bound water · MPERM - MRIL permeability · MPRM - MtHL permeability (AWS designation) · MPHG - Gas volume from Time Domain Analysis (corrected for Hydrogen Index and TI) · MPHO - Oil volume from Time Domain Analysis " · MPHW - Water volume from Time Domain Analysis " · MGAS - Uncorrected gas volume from Time Domain Analysis · MOIL - Uncorrected oil volume from Time Domain Analysis · MWTR - Uncorrected water volume from Time Domain Analysis · PHIE - Effective porosity from Time Domain Analysis · BVIL - Bulk Volume Irreducible from Time Domain Analysis · MSIG - Porosity sum (MCBW+MBVI+MBVM) · MPHS - Apparent porosity (MPHE+MCBW) · ECHOxxx or Exxx - MRIL Echo amplitude for echo number xxx. · ECHO - Amplitude of echo (array format data) · PHASxxx or Pxxx - MRIL Phase angle corresponding to echo nmnber xxx. · PHAS - Phase angle of echo (army format data) · P1PR - MRIL partial porosity bin at 0.5 ms ~ P2PR - M~,P~ partial porosity-bin at 1.0 ms · P3PR - MRIL partial porosity bin at 2.0 'ms · PI through Pxx - MRIL partial porosity (T2R) distribution bins from MAP processing. · Rev. 4/7/97 P136 through p936 - MRIL partial porosity (T2R) distribution bins from MAP processing ( TE=3.6 ~ns) BIN1 through BINxx - Summation of partial porosities (P1-Pxx) from MAP processing. For example BINi=P1, BIN2=PI+P2, BIN3=Pi+P2+P3 etc. · CBVWE - Bulk volume water effective from Numar MRIAN analysis · CBVWT - Bulk volume water total frown Numar MRIAN analysis · WI - Textural parameter assuming irreducible conditions · WW - Textural parameter assuming water wet conditions · WQ - Textural parameter used for CBVWE computation · PMRI - MRIL permeability from Numar MRIAN analysis, uses clay-corrected neutron-density Porosity rather than MPHI as the porosity input. · VCLAY - Volume of dry clay from CTP processing · VSHALE - Dry shale volume from CTP processing · CLPHIAPP - Apparent clay porosity from CTP processing · CLAYLINE - T2 cutoff between clay and capillary bound water · BVILINE - T2 cutoff between capillary bound and free fluid · T2 or T2GM - Transverse relaxation time · T2xx - T2 computed from TE = xx ms · IT2 - Inverse of T2 · D - Coefficient of diffusion · DW - Coefficient of diffusion for bulk water · RDDW - Ratio of D to DW · SW_T2D - Water saturation from T2 and diffusion log · SHY - Hydrocarbon saturation from T2 and diffusion log PORE_PAD - Pore radius from T2 and diffusion log · T1 or Ti_I - Longitudinal relaxation ti~ne (TI_I refers to T1 derived from uni-exponential fitting) NOV 2 1 1997 AJ~a Oil & Gas Oons. uu, r,~Nssion gnc.,horage · SWBM - Clay bound water saturation frbm MRIAN analysis · PND - Neutron - density crossplot porosity · CALIFLAG - Bad hole flag, typically computed using caliper and/or conventional porosity excursions. · RT - Deep induction with borehole and invasion corrections · GR - Gamma ray from conventional log mn · CALl - Caliper from conventional log mn, typically from density logs · SP - Spontaneous potential from conventional logs · PEF - Photoelectric effect from conventional logs · IDPH, liD, AT90, AF90, AO90, LLD, RILD, HDRS, DVR2, etc. - Deep resistivity from conventional logs · . IM~H, liM AT30, AF30, AO30, LLS, RILM, HMRS, MVR2, etc. - Medium resistivity from conventional logs · SFLU, SFL, AT10, AFl0, AO10, MSFL, RFOC, DFL, etc. - Shallow or micro-resistivity from conventional logs · PDSS - Density porosity using 2.65 gm/cc matrix density computed from conventional RHOB · PDLS - Density porosity using 2.71 gm/cc matrix density computed from conventional RHOB · PDDOL - Density porosity using 2.87 gm/cc matrix density computed from conventional RHOB · PCNSS - Neutron porosity using sandstone ~natfix computed frown conventional NPHI · PCNLS - Neutron porosity using limestone matrix computed from conventional NPHI · PCNDOL - Neutron porosity using dolomite matrix computed from conventional NPHI · GAMMA - MRIL gamma ray GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11472 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 10/21/97 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape Z-03 97440 PEX/BHC 970924 1 Z-03 97440 PEX-AIT 970924 I 1 .REDO:TOOLFAILED ON RUN#1.GEOQUEST WAS NOTINFORMED &THE EDITHADTO BE REDONE.NEW FILM FOR AlT W/iS GENERA1ED. BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVEL OCT 2 2 199 Anch0r~le Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received by . GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11452 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Prudhoe Bay (Cased Hole) 10/15/97 Well Job # Log Description Date BL RF Sepia LIS Tape Z-03 ~ '"7'~' ~/ 97450 RST 970926 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11446 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Open Hole) LIS Well Job # Log Description Date BL RF Sepia Tape Z-03' ,~"'~'-? ~_ ~"~ 97462 MWDGR 970920 I PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: 10/14/97 BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: 0CT 1 5 1997 Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11418 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Well Field: Job # Log Description Date BL Prudhoe Bay (Open Hole) LIS RF Sepia Tape Z-03 (COMPOSITE RUNS I & 2) 97440 PEX~BHC~AIT, NEUTRON~DENSITY 970924 1 Z-03 (COMPOSITE RUNS 1 & 2) 97440 PEX-BHC 970924 I 1 Z-03 (COMPOSITE RUNS I & 2) 97440 PEX-NEUTRON 970924 I 1 Z-03 (COMPOSITE RUNS I & 2) 97440 PEX-DENSlTY 970924 1 1 Z-03 (COMPOSITE RUNS I & 2) 97440 PEX-AIT 970924 I 1 Z-03 PEX-SSTVD 970920 I 1 Z-03 PEX-SSTVD 970924 I 1 Z-03 RST 970926 I I 1 O/6/97 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Julv 17. 1997 Paul K. Prince Senior Drilling Engineer BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bav Unit Z-03 BP Exploration (Alaska) Inc. Permit No: 97-131 Sur. Loc. 976'SNL. 1427'EWL, Sec. 19, T11N. R12E. UM Btmholc Loc: 1543'NSL. 1305'WEL. Sec. 19. T1 IN. RI2E. UM Dear Mr. Prince: Enclosed is thc approved application for permit to drill thc above referenced well. The permit to drill docs not exempt you from obtaining additional permits rcquired bv law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficicnt notice (approximatcly 24 hours) of the BOPE test performed bcforc drilling bcloxv the surface casing shoe must be given so that a representative of the Commission max.' xvitncss the test. Notice max, be given bv contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. BY ORDER OF THE COMMISSION d!f,-enclosures Department o1' Fish & Game. [ Iabitat Section w, o encl. Department et' I'~nvi~lomm¢ll! Consen'ation w;o encl. STATE OF ALASKA ALASKA .~,L AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil [] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE - 83.75' Prudhoe Bay Field / Prudhoe 3. Address 6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028262 4. Location of well at surface 17. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 976' SNL, 1427' EWL, SEC. 19, T11N, R12E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 2S100302630-277 1543' NSL, 1305' WEL, SEC. 19, T11N, R12E, UM Z-03 At total depth 19. Approximate spud date Amount $200,000.00 1543' NSL, 1305' WEL, SEC. 19, T11N, R12E, UM 07/20/97 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 047453, 1543'I Z-04, 38' away at 939' MD 2560 10188' MD/9201' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 2000' Maximum Hole Angle 33° Maximum surface 3330 psig, At total depth (TVD) 8800' / 4390 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' Surface Surface 110' 110' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC-Mod 3114' Surface Surface 3114' 3084' 120 sx CSIII, 470 sx 'G', 1955 sx CSIII 8-1/2" 7" 26# L-80 BTC-Mod 9736' Surface Surface 9736' 8449' 505 sx Class 'G' 6" 4-1/2" 12.6# L-80 IBT-Mod 602' 9586' 8579' 10188' 9201' 105 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented M D TVD Structural Conductor Surface Intermediate NXL LPirn°edrUCtion ORIGI REC[iVED Perforation depth: measured dUL -}, 199[ true vertical 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling [] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 R~quirements Contact Eng/neer Name/Number: Davjd~Vakamura, 564-5606 Prepared By Name/Number: Terrie Hubble, 564-4628 21. ] hereby certify that the fCr,~:joir~ i¢/~ru~nd correct to the best of my knowledge -¢'rl Signed y~j,~¥1,~ ~ ~ Paul K. Prince '-"'- Title Senior Drilling Engineer Date ~ '~ % Commission Use Only Permit Number I APl Number I Approval Date See cover letter ~',~"/-~ ,/I 50- ~ ,2_. ~ -- ~ Z,, 7 ~ ~] '~ ~/~'' 9>'~ for other requirements Conditions of Approval: Samples Required []Yes IXINo Mud Log Required []Yes ~No Hydrogen Sulfide Measures I~Yes []No Directional Survey Required []Yes []No Required Working Pressure for BOPE 1-12M; 1-13M; [~SM; [-]10M; I--I15M Other: dr~g~nat Signed By by order of Approved By W. Johnston Commissioner the commission Date "~ Form 10-401 Rev. 12-01-85 Submit In Triplicate Iwell Name: Iz-03 Well Plan Summary I Type of Well (producer or injector): I Oil Producer Surface Location: 976' FNL 1427' FWL Sec 19 T11N R12E Target Location: 1543' FSL 1305' FEL Sec 19 T11N R12E Bottom Hole Location: 1543' FSL 1305' FEL Sec 19 T11N R12E I AFE Number: I 4P0974 I I Rig: I Nabors 18E I Estimated Start Date: I July 20, 1997 I I Operating days to complete: 120 I MD(LL): 110188' I I TVD(EL):19201' I IRT-GL I KBE: I Well Design (conventional, slimhole, etc.) Ultra Slimhole S-Shaped Well I29.7' 83.75' Formation Markers: Formation Tops MD TVD (RKB) Base Permafrost 1885' 1884' Sag River 9716' 8729' Shublik 9745' 8758' Sadlerochit 9886' 8899' HOT 10038' 9051' OOWC 10064' 9077' TD 10188' 9201' I I Casin I/Tubing Proqram: Hole Size Csg/ Wt/Ft Grade Conn. Length Top Btm Tbg O.D. MD/TVD MDrrVD 30" 20" 91.5# H-40 Weld 80' Surface 1107110' 12-1/4" 9-5/8" 40# L-80 BTC- 3114' Surface 3114'/3084' MOD 8-1/2" 7" 26# L-80 BTC- 9736' Surface 9736'/8449' MOD 6" 4-1/2" 12.6# L-80 IBT- 602' 9586'/8579' 10188'/9201 ' MOD Tubing Directional: IKOP: 12000, I Tangent Angle Close Approach Well: 33.0° Z-04 (38' away at 939' MD), Z-02A (63' away at 2150' MD) and Z-01 (82' away at 2217' MD) Z-03 Permit Info Page 1 Logging Program: MWD Directional MWD: GR/Directional MWD: ESS E-Line: AIT/LDT/CN L/G R/S P/Caliper Optional: CNL/CBT Mud Program: Surface Mud Pr(~perties: I Surface hole section: SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.5 _ 300 40-60 30-60 50-80 9-10 15-25 Final 9.5 200-300 25-50 15-25 25-40 9-10 15-25 Hazards/Concerns Due to light gravel expectations, no real concerns in surface hole. Intermediate Mud Properties: I Intermediate hole section: LSND Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.8-9.0 35-40 8-12 3-6 8-10 9.0-9.5 8-12 Ku paru k 10.6 40-45 10-12 4-8 8-12 9.0-9.5 6-8 Kingak 10.6-11.0 40-55 12-18 4-8 8-18 9.0-9.5 <6 HTHP-12.0 Final 10.6-11.0 40-55 12-18 4-8 8-18 9.0-9.5 <6 HTHP-12.0 Hazards/Concerns Kuparuk overpressure expected on Z Pad, MW to be at least 10.6 ppg. Utilize hi vis sweeps to assist hole cleaning Monitor LSYP and increase if problems occur trying to clean the hole. Potential high torque could need lubricants (EP MudLube) Reduce APl fluid loss to <6 cc before drilling Kingak Section. If high torque is encountered, respond with lubricants. Note: The Jurassic shales may be troublesome, so treat with 2 ppb Baratrol and 6 ppb Baranex. Sadlerochit Mud Properties: I Production hole section: New LSND Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss Initial 8.8-9.0 45-53 12-15 4-8 8-12 8.5-9.0 <6 Final 8.8-9.0 45-53 12-15 4-8 8-12 8.5-9.0 <6 Hazards/Concerns Lost Circulation a possibility due to overbalance in Sadlerochit. Differential sticking possible with overbalance situation. High torque may be experienced and should be countered with lubricants Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Z-03 Permit Info Page 2 PROPOSED DRILLING AND COMPLETION PROGRAM WELL: Z-03 1. MIRU. NU diverter and function test same. . Drill 12-1/4" hole to +_3114' MD/3084' TVD. Run and cement 9-5/8" 40# L-80 BTC-MOD casing to surface with Halliburton ES Cementer (two stage surface cement job). . Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Function test BOPE to 5000/250 psi. . Test 9-5/8" casing to 3000 psi for 30 minutes. A formation leak-off test will be performed when 20' of new hole has been drilled below the 9-5/8" shoe. Also, perform a well kill drill at this time. , Directionally drill 8-1/2" hole to 7" casing point at +_9736' MD/8749' TVD. Run 7" 26# L-80 BTC-MOD casing string and cement with Class G cement to 500' MD above the Ugnu. Test casing to 3,500 psi. The annulus will be freeze protected with dead crude oil. , Drill 20' of new 6" hole and test the formation to a minimum of 0.5 ppg over the mud weight to be used to drill the previous hole section. Displace mud system to new LSND mud system. Rotary drill 6" section to TD at +_10188' MD/9201' TVD. 7. RU Schlumberger. E-line log well with AIT/LDT/CNL/GR/SP/Caliper. RIH with 4-1/2", 12.6#, L-80 liner, 2-7/8" inner cementing string and a 7" x 4-1/2" packer/hanger spaced out for a 150' lap. Pump cement and displace well with seawater. Bump plug. Set and test liner hanger/packer with 3500 psi. Continue displacing well to seawater. 10. Run 3-1/2", 9.3# L-80 EUE-MOD tubing with SSSV, GLMs, and 7" packer assembly. Circulate around freeze protection fluid and corrosion inhibitor. Set packer and test tubing to 4,000 psi. Set TWC and test to 1000 psi. ND BOPE. NU tree and test to 5000 psi. Pull TWC. Test tubing x casing annulus to 3500 psi for 30 minutes. Secure well. Release rig. Drilling Hazards · Hydrocarbon-bearing zone in the Ugnu formation. Losses have been encountered drilling the Kingak, Sag River/Shublik and Sadlerochit formations on Z Pad. Be prepared for losses near any faults and formation interfaces between the Kingak, Sag River/Shublik and Sadlerochit. A minimum of 10.6 ppg mud weight will be used to drill the Kuparuk interval. Hi~'t'~r~,JJ¥~['~tl~i~ls,.~ ~j~ud weight used to drill the Kuparuk on Z Pad. Disposal Cuttings Handling: Fluid Handling: Cuttings should be hauled to the ball mill at CC-2A. ~a.S~. 0il & i~a.~ C:~;$, C0i~,]!~issior~ Anch0ra!~ Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cutting from drilling operations to CC- 2A for disposal, except the metal cuttings which will be sent to the North Slope Borough. Z-03 Permit Info Page 3 9-5/8" CASING CEMENT PROGRAM CASING SIZE: 9-5/8" FIRST STAGE CEMENT PREFLUSH: 75 bbls viscosified fresh water ahead of lead slurry. CIRC. TEMP: 38°F LEAD CEMENT TYPE: COLD SET III (accounts for any variance in depth of ES cementer) ADDITIVES: retarder WEIGHT: 12.2 ppg APPROX. # SACKS: 120 TAIL CEMENT TYPE: CLASS G ADDITIVES: 2% A-7 +1 ghs FP-6L WEIGHT: 15.8 ppg APPROX. # SACKS: 470 YIELD: 1.92 ft3/sx MIX WATER: 10.53 gps THICKENING TIME: Greater than 4 hr. @ 50°F YIELD: 1.15 ft3/sx MIX WATER: 4.95 gps THICKENING TIME: Greater than 3-1/2 hr. @ 50°F SECOND STAGE CEMENT PREFLUSH: 75 bbls viscosified fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET III ADDITIVES: retarder - (Add 9 ppb Borax to first 30 bbls (90 sx) of Cold Set III lead cement in second stage) WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx MIX WATER: 10.53 gps APPROX. # SACKS: _+1955 THICKENING TIME: Greater than 4 hr. @ 50°F TOP JOB CEMENT TYPE: COLD SET II (if necessary) ADDITIVES: WEIGHT: 14.5 ppg YIELD: 0.96 ft3/sx MIX WATER: 3.89 gps APPROX. # SACKS: 250 THICKENING TIME: Greater than 2 hr. @ 50°F CENTRALIZER PLACEMENT: 1. Run one (1) bow spring centralizer per joint for the first 15 joints. CEMENT VOLUME: 1. Lead slurry volumes estimated: a. Base of Permafrost to Conductor shoe with 400% exces,s b. Conductor x Surface Casing annulus (80' MD) ~[~¢> c. Cement in surface casing to the ES Cementer at 1,800' MD NOTE: With the two stage job, the actual lead cement volumes will be determined by the amount of cement necessary to get lead cement to surface. 2. Tail slurry volume from surface casing shoe to Base Permafrost with 30% excess plus the 80' shoe volume 3. Top job volume 250 sx (if necessary) Z-03 Permit Info Page 4 7" CASING CEMENT PROGRAM CASING SIZE: 7" PREFLUSH: 20 bbls fresh water SPACER: 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight. CIRC. TEMP: 140°F LEAD CEMENT TYPE: CLASS G ADDITIVES: 3% A-2 + 0.4% FL-52 + 0.5% CD-32 + 1 ghs FP-6L WEIGHT: 11.0 ppg APPROX. # SACKS: 320 YIELD: 3.31 ft3/sx THICKENING TIME: 5 hrs MIX WATER: 20.92 gps FLUID LOSS: 150-250 cc/30 minutes FREE WATER: 0 cc TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1.0 ghs FP-6L WEIGHT: 15.8 ppg APPROX. # SACKS: 185 FLUID LOSS: 100-150 cc/30 minutes YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps THICKENING TIME: 3-1/2 to 4-1/2 hrs FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1. Run 1 straight blade rigid centralizer per joint from TD to 500' MD above Sag River. 2. Run 1 straight blade rigid centralizer every joint 300' above and below the Ugnu. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacedmud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix the lead and tail slurries on the fly. CEMENT VOLUME: 1. Lead slurry to 3186' MD (500' above Ugnu) with 50% excess 2. Tail slurry to 8753' MD (1000' above Sag River) with 50% excess 3. 80' MD 7" 26# capacity for float joints. Note: Hydrocarbon bearing zones are identified in the Ugnu, Kuparuk and Sag River intervals. z-03 Permit Info Page 5 4-1/2" LINER CEMENT PROGRAM CIRC. TEMP: 140° F PREFLUSH: 20 bbls fresh water SPACER: 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight BHST: 235° F at 8800' TVDss CEMENT TYPE: CLASS G ADDITIVES: 175 ghs BA-86L + 2% A-9 + 0.6% CD-32 + 0.3% FL-33 + 0.2% A-2 + 0.5% gel + 1 ghs FP-6L WEIGHT: 15.7 ppg YIELD: 1.19ft3/sx MIX WATER: 3.43gps APPROX. # SACKS: 105 THICKENING TIME: 45 min. @ Surface + 3-4 hr. @ 140°F FLUID LOSS: less than 50 cc/30 minutes @ 140°F FREE WATER: 0 cc at 45° angle. CENTRALIZER PLACEMENT: 1. Run 2 right hand turbolators per joint in open hole, 2. Run 1 right hand turbulator per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss should be 50 cc/30 min. or less. Report actual fluid loss on morning report. Displace @ 6-8 bpm. LINER CEMENT VOLUME: 1. Open hole (6" X 4-1/2") + 40% excess (adjust if a caliper log is run and it indicates severe washouts). 2. 4-1/2", 12.6# casing capacity below landing collar (80'). 3. 150' liner lap Z-03 Permit Info Page 6 ii1~1 [ ...... SHAREB SERVZCES DRZLLTNG , .. . ....... Z-OB (PS) VERTICAL SECTION VIEW 60o 8 '- Section at: ~41,0~ TvD Sca~e.' ! inch = ~200 feet c-- Oep Scale' ! inch = ~200 t200 "' - ' Ora~n · 27 Jun ~997 , , , ,~oo .... ~ .............. ~,~~,~_~ Anadri ]] Schlumberger 2 M~r~er Identification MD BKB SECTN IN~LN ~400 ~) KB 0 0 0 0.00  B} NUDGE BUILD t/tO0 600 600 -0 0.00 C] END t/t00 BUILD ]000 1000 12 4.00 3000 ' " D) DROP 1/100 t400 1399 37 ~,00 d ~'.. E) END 1/t00 DROP 1800 1798 ~9 0.00 K~ F) KOP / BUILD i/lO0 2000 tg98 4g 0,00 G) BUILD 1.5/~00 2100 20gB 50 3600 ~ . H) BUILD 2/t00 2200 2rgb 52 ~.50 I) BUILD ~.5/100 2300 2298 58 4,50 ~ J) g-5/8' CSG PT <mm > 3t~4 3084 255 24.22 ~200 K) END ~,5/i00 3465 3391 422 32,95 L) OflOP B/lO0 gOOa 8039 3435 32.95 M) END 8/$00 DROP 9416 8429 3550 0.00 480o . ~ - N) 7' CSG PT <11 > 9754 8767 3550 0.00 ....... O] TARGET w*~*~w**w* 9886 8899 3550 0.00 . ~ P) 4-t~' LNR PT <Il > lOlBB 920t 3550 0.00 ' ~) ~O iOlBB 9~Ot 3550 0.00 5400 m 6000 · ~ ~~_ ~ - A~k-DPC ....... APP  FO~ PE tMll'TIN'~ Ak !! ~ ,. , 7eoo ~ ~ l 7800 ~ _ 8400 -: - - · - H ' -~~ ~ = .~. =...,.... :., = =.,., ,,, .. ~,,,. ,,,.,..,, ..... ,...., ~.'~' .., ..................... ~ _Z~,~d~: ~5~J .... , 10800 0 600 t200 tBO0 ~ ~400 3000 3~0 4200 4600 5400 6000 6500 7200 7600 Sectkon Depac[uPe . mm m i ~ · i ii c_ SHARED SERV ICI- S DRILL I NG Mar, kee Tdent ~ t~Lcat ~an MD ~/S E/W Z--03 (P5) ~) KB 0 0 N 0 E .) .u~ ~u~o u~oo ~oo o. o ~ ~ PLAN VIEW E) END ~/tO00ROP t~O0 55 S tO E CLOSURE ' 3550 feet at Azimuth ~4~.02 F) KOP / BUILD 1/100 8000 55 S 10 E DECLINATION ' +28.084 BUILD 1.5/t00 2100 58 S t0 E ~ BUILD ~/~oo 2200 59 S ~0. E ,SCALE ' 1 inch = 500~eet I) BUILD E.5/t00 2300 ~5 S 1~ E J) ~-5/8' CSG PT <i1> 3~1a 22B S ~ E DRAWN ...... ' 27 Jun 1997 K) END 2,5/~0~ ~465 3~9 S E27 E L) 0~0~ SilO0 ~00~ 267] S 2~5~ E , ,, m ~.o u~ooo~oP 9~m ~os ~a~ ' m 7' CSG P~ <~> ~7~ eT~O S ~ ~. AnadrJ]] Soh]umberger O) TARGET m~*~m~m~ ~886 2760 S 2233 E _ , , P) 4-~q2" LNR PT <1~> -101B8 2760 S ~233 E ,. ~ 2~ T~ tO~Dg~,~'~s :~3 E -- 0 i- J -. ~NADI ',ILk' ~ ~o X~ AF,PRO'/.ED - , ONL~ _. i . . . . ~00 .- ~ . ~. " . . ' .. · JSO0 ' ~ ' ~75~ ': '" 2000 : ' ' ~ ' ' 2500_ ,, .' ~r~_(Radius 150 fee ) , 3000 -" 3250 . 25o 0 ~50 500 750 1000 J250 ~500 1750 2000 2250 2500 2750 3000 3250 <- WEST · EAST -> i i (~nedrJll (c)97 ZO3PS 3.0C c ~9 PM PI AnadriLL Schlumberger Alaska District 111l HaBt 80~h Avenue Anchorage, 11/( 99518 [907) 349-'4511 Fax 344-2160 D£R~CTIONAL WHLL ?LP~ for SKAR~D BHRVICK5 DRILB£NG well ......... : Z-03 (PS) Field ........ : Prudhoe Bay, Z-Pad Computation..: Minimum CurvattLre Units ........ ~ FEHT Surface Lat..: 90.29770070 N Surface ~onc3.: 149,19705946 W Legal Description Surface ...... : 4304 PSL 3527 FEL Target ....... : 1543 FSL L305 FEL BHL .......... : 1543 ~SL L305 FEL LOCATIONS - A/J~S~ Zone: 4 X-Coord X~Coord 519 Tl114 RL2E U M 599IS0,99 5959099.96 819 TllN RL2~ UM 601420.00 59563q0.O0 819 ~11N R12E UM 601420,00 59563~0.O0 PROPO~ED ~L/~ PROF.IL~ ~TATIO~ ~U~D I~ msmm mm mmm~;:~ :~mu mmm mmmmmmmm ~ :~ ~ 0.00 .0.00 ~03LV 3/~oo ~o.oo 0.00 ~. 700.00 L.O0 ~;, 800. O0 2.00 ~,. '~ 900.00 3.00 .... ~ ,~ .... I00'BUI5D : ..... ~, 1000.00 ~ ~ 1500.00 3.00 ~ c~ "'~-'~ 1600.00 2.00 ~==mmmmmm mmmmmmmmm==:~=:~ DIRECTION ¥~RTICAL-DBPTH~ AZIMUTH TVD SUB-S~A 0.00 0.00 170.00 600.00 516.25 170.00 699.99 170.00 ~99.96 716.21 170.00 899.85 816.11 170.00 999.68 9L5.93 1'70.00 1398.70 1314.95 1';0.00 1498.51 1414.76 170-00 /598.42 1514 IT0.00 1698.38 16£4.63 LT0.00 1798. $8 1714.63 L?0.00 L883-75 1800.00 Prepared ..... ~ 27 Jun 1997 Vert sect az.: 141-02 KB elevation., 83.~5 it Magnetic Dcln: +28.084 (H) ScaLe Paetor.~ 0.9999111? Convergence..: ,0.75593964 ANADRILL AKA-DPC APPROVED FOR PERMITTING ONLY PLAN -___ ,, Isssmmmm mmmm=~a:==~mlsmlmmlm~ m;:~::amssmmmmsmmmmm SHCTION OOORD£HATHS-Eq~OM ALASKA Zone 4 DRPART W]~L~HAD X Y 0.00 0.00 N 0.00 ~ 599150.99 5959099.96 -0.00 0.00 N 0.00 B 599150.99 S95909~.96 0,76 0.86 8 O.Z5 B 599151.15 5959099.L0 3.05 TOOL DS/ FACE 100 Lg0R O.00 170R 0.00 ~90R 1.00 3.4~ ~ 0.61 E 599151-64 S959096.53' ~?0R 1.00 ~.73 8 L.$6 g 599152.46 5959092.25 ~OR L.00 12.21 13.76 S 2.42 E 599153.59 5959086.25 170R 1,00 36.62 41-22 S 7.27 H 599158.80 5959056.84 170R 0.00 4L.96 47.24 S 8.33 8 599159.94 5959052.84 170R 1.00 45.78 51.52 S 9-09 H 599~60.75 5959048.56 I~0R 1.00 48.09 54.11 S 9.5i H 599161.24 5959045.99 170R 1.00 46.83 54,97.S 9.69 H 599161.41 5959045.13 170R 1.00 48.83 ~4.97 S 9.69 H 599161.4£ 5959045.13 I?0R 0.OD I'rl (Anadrlll (e)97 Z03P5 '3.0C 1:16 PN P) STATION IDHFCIFIC/TION KOP / BU£1~D i/100 BUILD /.5/L00 Bu£~ 2/~00 8UXY~ 2,5/L00 PROPO~RDWBbb PR0eI~A N~UR~D [~CI.~ 2000.00 0.O0 2[00-00 1.00 2200,00 2.~0 2300.00 4.50 2400.00 6.72 {mmmmmmmmmllm D£RECTION YERTICAL-DHPTI~S AZIMUTH TVD $1R3-SEA 170,00 1998,38 1914.63 170,00 2098,3T 201~,62 170,00 2L98,32 2L1%,$7 170,00 2298,~3 2214,38 158,03 2397,65 2313,90 '2500.00 9.09 2~00.00 11.5l 2700.00 13.96 2800.00 16.43 2900.00 18.90 152,11 2496,69 2412,94 148,65 2595.07 2511.32 £46,38 2692,61 2608,86 ~44,~8 2789.30 2705,35 L43.59 2884.38 2800.63 SECTIO~ DEPART 48,83 49.59 52.26 57.60 66.64 79.99 97.63 ~39.54 145.66 175.96 27 Jun 1997 Page 2 COORD£NATHS-FROM ALASKA goue 4 9OOL DL/ 9(H~bSHAD X Y P~ 10O 54,97 S 9,69 ~ 599161,4L 5959045,~3 [70R 0,00 55.63 S 9.84 H 599161,5g 5959044,27 ~70R L.0O S8.84 S 10.3~ g ~99162.L4 59S9041.27 ~70R L.~0 ~4-8S ~ 1L.4~ & 59916~.28 S95903S.28 168R 2.00 ~%.14 ~ 14-~ E 599L66.27 S9S9026.02 22L 2-S0 86.55 S 20.~9 H 599L72,32 5959013.69 16L 2.50 L02.06 S 29.08 ~ 599183.41 5958998,3L 13b 2.SO L20,63 S 40,95 B 599L93.53 5958979,89 LOb 2.50 /42.23 S 55.79 H 599208.65 5958958-49 9b 2.S0 166.82 S 93,56 H 599226.74 5958934-L4 8b 2.50 9-s/8. cs~ p~: <Il> E~O 2.5/~00 O~ 8/~oo END 8/LO0 DROP 8KU33LI K 3000.00 21.38 3LO0,O0 23.86 3L1~.45 24.22 3200,00 26.35 3300.00 28.84 3400,00 31.33 3465,14 32.95 9004,06 32.95 9LO0.O0 25.28 9200.00 17.28 9300,00 9,28 9400,00 1.28 94L5.98 0.00 97L5.98 O.OO 9744.98 0.00 7" CS~ PT <JJ> 9753.98 0.00 TAR~HT *~*****"***~ 9885.98 0.00 T~AD 9585,98 0.00 (A~adrilL (c997 Z03P5 3,0C L:16 ~ P) L42.66 2978.26 2694.51 L4~.92 3090.56 2986.8~ L41.83 3083.75 3000.GO L41.32 3~61.10 $077.35 L40.81 3249.~2 3165,9~ 210.36 248.82 254.70 291.24 33~.56 L40.37 3336.24 3252.~9 38~.68 L40.12 3391.39 3307.64 422.34 L40.12 8039.1~ 99S5.42 3434.90 L40.12 8122,92 8039,17 3481,54 L40,12 8216,03 8132,28 3~1~,80 194,35 8 94,23 R 599247,77 5958906,89 ?b 2,50 224,~7 8 LL?.,77 B 599271,70 5958876,78 6L 2,50 229,40 ~ £2~.40 ~ 599275.40 5958872,20 6~ 2,50 2~8,03 ~ £44.12 H 599298,49 5958843,88 6~ 2,50 294.05 S £73.2~ H 599328.08 5958808.25 5~ 2.50 332,79 S 205,07 H 599360,4L 5958769.95 5L 2,50 359.41 B 229.23 H 599382,92 5958743.61 H9 2.50 2671.45 S 2~59.11 H 601344,96 595645?.43 LS 0,00 2707.28 8 2~89.02 H 601375,34 5956422.04 L8 8,00 2935,L0 8 2212.27 H 601398,95 5956394,52 ~g 8,00 L40.12 8313.28 8229.53 3540.75 2~$2.T1 S L40.12 8412.77 8329.02 3549.94 2759,77 S [40.12 8428.75 8345.00 3550.L2 2759.90 S L40.12 8728,q5 8645.00 3550.12 2769.90 S L40,12 8757.75 8674,00 ~550,L2 2759,90 S 3550. L2 3550.12 3550. L2 L40.12 8966.95 8683.00 L40.12 8898.75 88L5.00 L40.12 8898.75 88£5.00 2759-90 S 2V59.90 S 27S9.90 S 2226,99 H 601413,90 5956379,11 2232.88 B 601419,88 5956370.14 240R 2232.99 E 601420.00 5956~70.00 2232.99 ~ 601420,00 59S6370.00 2232.99 ~ 601420,00 $956370.00 2232.99 E 601420.00 59563?0,00 2232.99 E 601420-00 S956370,00 2232.99 g 6G1420.00 5956370.00 ANADRILL 8.00 8.00 8.00 140R 0,00 140R 0.00 140R O-OO 14fir 0.00 140R 0,00 AKA-DPC APPROVED FOR PERMITTING ONLY ITl PROPOSED ~ELL PEOPILH DZRHCT£ON 3/HRT I CAr. - DB[~THS AZX~H T~ L40 . 12 90~0.75 896~ .0O 140 ,12 9076.7~ 8993 .00 140,L2 9200.75 9117.00 ~40.12 9200.75 g117.00 27 Jun 1997 ======um mmmmmmmmn=~= $ ECT~ ON COORDiNATeS- F~O~4 DEPART WHLLHHAD 3650.~2 2759.90 S 2232.99 3550.~2 2759.9O S 2232.99 3550.]2 2759.90 S 2231.99 ~5~0.12 2759.90 S 2232.99 ALASKA ~¢Le 4 TOOL DL/ X Y FAC~ 100 m~mmJmmm~ mu]mmma=~= ; 601420.00 6956370.00 140R 0.00 601420.00 5956370.00 ~40R 0.O0 60L420.00 5956370.00 0.00 601420.00 5956370.00 0.00 ANADRILL AKA-DPC APPROVED FOR PERMITTING ONLY. PLAN # 5- (Aaadrill (c]97 ZO3P5 3.0C ~:16 PM g) H124013 06/17/971 00124013 . VENDOR DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT 061697 HANDL CK061697C INQ INST: s/h THE ATt'ACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. teeeie hubbl e x 4628 100.00 AlASKAST14 OO NET 100.00 WELL PERMIT CHECKLISToo. .Y GEOL AREA PROGRAM: exp~q dev~redrl[1 servO wellbore segD ann disp para reqD ADMINISTRATION 1. Permit fee attached ................... ~Y 2. Lease number appropriate ................ 3. Unique well name and number ............... ~Y 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary.. %Y 6. Well located proper distance from other wells ...... IY 7. Sufficient acreage available in drilling unit ...... 8. If deviated, is wellbore plat included ......... 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order ..... ~Y 12. Permit can be issued without administrative approval.. ~Y 13. Can permit be approved before 15-day wait ........ ENGINEERING 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~ N 16. CMT vol adequate to circulate on conductor & surf csg..~ N 17. CMT vol adequate to tie-in long string to surf csg . . . Y ~ 18. CMT will cover all known productive horizons ...... ~ N 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit .............. (v'3 N 21. If a re-drill, has a 10-403 for abndnmnt been approved..~ N 22. Adequate wellbore separation proposed .......... ~ 23. If diverter required, is it adequate .......... ~ 24. Drilling fluid program schematic & equip list adequate .~ N 25. BOPEs adequate ..................... ~ N 26. BOPE press rating adequate; test to ~ psig.~ N 27. Choke manifold complies w/API RP-53 (May 84) ...... ~ N 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............ O N GEOLOGY / 30. Permit can be issued w/o hydrogen sulfide measures .... Y N// _ 31. Seismic analysis of shallow gas zones .......... ~--N ~_,~~ Data presented on potential overpressure zones ..... Y/N 32. 33. Seabed condition survey (if off-shore) ........ / Y N ' - ' ~ 34. Contact name/phone for weekly progress reports . . . / . Y N [ exploratory only] REMARKS GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: HOWldlf- A:\FORMS\cheklist rev 01/97 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ~ LIS READ ~ (NOTE: MAXIMUM RECORD LENGTH - 8192 BYTES) ~ REEL HEADER ~ REEL SEQUENCE SERVICE NAME: NUMAR DATE: 97/12/12 ORIGIN OF DATA: REEL N~ME: BP CONTINUATION ~: 01 PREVIOUS REEL N~v~E: COP~iENTS: PETROLEUM COMPUTING ]~C ~S FO~>~T SERVICE NAME: NUi~iAR DATE: 97 / 12 / 12 ORiGiN OF DATA: TAPE NAME: BP CONTINUATION #: 0i PREVIOUS TAPE NAME: COPhMENTS: PETROLEUM COlv~UTiNG INC.- END OF FiLE (EOF # 1) ~~~ FiLE HEADER x~ FiLE SEQUENCE # i ~'iLE NAM~E: NUPiAR SERVICE NA~E: N UMkAR VERSION #: REV i.0i DATE: 97/12/12 FILE TYPE: PREVIOUS FILE NAME: ~ iNFOrMATION RECORD MNEM CONTENTS CN BP EXPLORATiON(ALASKA), INC. WN Z-03 FN PRUDHOE BAY FL 976~ SNL & i427~ EWL STAT ALASKA COUN NORTH SLOPE CTRY USA SECT 19 TOWN lin RANG i2E APiN 50-029-22787 DATA FO~v~T SPECi~'±CATiON ~ ENTRY BLOCKS TYPE SiZE REP CODE ENTRY 3 2 79 184 4 1 66 255 8 4 68 .50 9 4 65 FT 1i 2 79 5 12 4 68 -999.25 16 i 66 0 0 i 66 DESCRiPTiON DATA FRA~¢~ SiZE (BYTES) LOG DiRECTiON, DOWN DATA FRAME SPACING UNITS OF DATA FRAME SPACING ~XiMUM FRAMES / DATA RECORD ABSENT VALUE SPECiFiCATiON BLOCK SUB-TYPE TERMINATOR (NO MORE ENTRIES) DATUM SPECiFiCATiON BLOCKS NAME SERVICE SERVICE UNiT APi APi APi APi FiLE SZE PROC SPL REPR iD ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 i 4 0 i 68 ~AMM cps 0 0 0 0 1 4 0 i 68 MBVI pu 0 0 0 0 1 4 0 i 68 MFFI pu 0 0 0 0 1 4 0 i 68 MPHI pu 0 0 0 0 i 4 0 i 68 Pi pu 0 0 0 0 1 4 0 1 68 P2 pu 0 0 0 0 i 4 0 1 6S P3 pu 0 0 0 0 1 4 0 i 68 P4 pu 0 0 0 0 1 4 0 i 6B P5 pu 0 0 0 0 1 4 0 i 6~ P6 pu 0 0 0 0 i 4 0 i 68 P7 pu 0 0 0 0 1 4 0 1 6~ P8 pu 0 0 0 0 i 4 0 i 68 P9 pu 0 0 0 0 i 4 0 i 68 SBVi pu 0 0 0 0 i 4 0 i 68 PiPR 0 0 0 0 i 4 0 1 68 P2PR 0 0 0 0 i 4 0 i 68 P3PR 0 0 0 0 i 4 0 i 68 MCBW pu 0 0 0 0 i 4 0 i 68 MSiG pu 0 0 0 0 1 4 0 i 68 WQ 0 0 0 0 1 4 0 i 68 WI 0 0 0 0 i 4 0 i 68 ww 0 0 0 0 i 4 0 i 68 B~-WE DEC 0 0 0 0 i 4 0 i 68 SWBM DEC 0 0 0 0 i 4 0 i 68 MFFi DEC 0 0 0 0 i 4 0 i 68 PMRi MD 0 0 0 0 i 4 0 i 68 BiNi PU 0 0 0 0 i 4 0 i 68 BiN2 PU 0 0 0 0 i 4 0 i 68 BiN3 PU 0 0 0 0 i 4 0 i 68 BIN4 PU 0 0 0 0 1 4 0 1 68 BIN5 PU 0 0 0 0 i 4 0 i 68 BiN6 PU 0 0 0 0 i 4 0 i 68 BiN7 PU 0 0 0 0 i 4 0 1 68 BiN8 PU 0 0 0 0 i 4 0 i 68 BiN9 PU 0 0 0 0 i 4 0 i 68 MPRM 0 0 0 0 i 4 0 i 68 P25 0 0 0 0 1 4 0 i 68 P35 0 0 0 0 i 4 0 1 68 P45 0 0 0 0 1 4 0 1 68 P55 0 0 0 0 1 4 0 1 68 P65 0 0 0 0 1 4 0 1 68 P75 0 0 0 0 i 4 0 i 68 P85 0 0 0 0 i 4 0 i 68 P95 0 0 0 0 i 4 0 1 68 DATA FO~AT SPECiFiCATiON ENTRY BLOCKS TYPE SiZE REP CODE 3 2 79 4 i 66 8 4 68 9 4 65 il 2 79 12 4 68 16 i 66 0 i 66 ENTRY 184 255 .50 5 -999.25 0 DESCRiPTiON DATA FRAME SIZE (BYTES) LOG DiRECTiON, DOWN DATA FRAME SPACING UNITS OF DATA FRA~iE SPACING i¢~XiMUM FRA~ES / DATA RECORD ABSENT VALUE SPECiFiCATION BLOCK SUB-TYPE TE~viiNATOR (NO MORE ENTRIES) DATUM SPECIFiCATiON BLOCKS N~E SEkv±u~ ~viCE UNiT APi APi AP± au± FiLE SZE PROC SPL ~PR ID ORDER# LOG TYP CLS MOD NO. LVL CODE DEPT FT 0 0 0 0 i 4 0 i 68 G~¢nwi cps 0 0 0 0 i 4 0 i 68 MBVi pu 0 0 0 0 i 4 0 1 68 MFFI pu 0 0 0 0 i 4 0 i 68 MPHi pu 0 0 0 0 i 4 0 i 68 Pi pu 0 0 0 0 i 4 0 i 68 P2 pu 0 0 0 0 i 4 0 i 68 P3 P4 P5 P6 P7 P8 P9 SBVi P1PR P2PR P3PR MCBW MSIG WQ Wi W-W BVWE SWBM MFFi PMRI BiNi BiN2 BiN3 BiN4 BIN5 BiN6 BiN7 BiN8 BiN9 MP Pa~I Pi5 P25 P35 P45 P55 P65 P75 pu pu pu pu pu pu pu pu pu pu DEC DEC DEC MD PU PU PU PU PU PU PU PU PU 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i i i i i i i i i 1 i i i i i i i i i i i i i i i i i i i i i i i i i i i 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 i i i i i i i i i i 1 i 1 i i i 1 i i 1 1 i i i i i i i i i i 1 i i i i 1 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 O~ 68 68 68 68 68 68 68 68 68 68 68 68 68 68 P95 0 0 0 0 i 4 0 i 68 Num. DATA RECORDS 281 START DEPTH 9608.000 END DEPTH DEPTH INCREMENT 10308.000 FT .5000 FiLE TRAILER~ FiLE N~ME: NUMAR SERVICE NAME: NUMAR VERSION #: REV i.0i DATE: 97/12/12 MAX. RECORD LENGTH: FiLE TYPE: NEXT FiLE N~ME: 1024 TAPE TRAILER~ SERVICE NAME: NUMAR DATE: 97/12/12 ORIGIN OF DATA: TAPE NAME: BP CONTiNUATiON #: 0i NEXT TAPE NAME: CO~ENTS: PETROLEUM COMPUTING iNC.- LiS FO~T REEL TRAILER SERVICE NAME: NUMAR DATE: 97/12/12 ORIGIN OF DATA: REEL N~ME: BP CONTiNUATiON #: 0i NEXT REEL N~ME: COPhMENTS: PETROLEUM COP~UTiNG iNC.- LiS FO~T TAPE TErMiNATED BY REEL TRAILER * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER ....... COMPANY NAME : BP EXPLORATION (ALASKA) WELL NAM~ : Z-03 FIELD NAI~E : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API iFUFI~ER : 50-029-22787-00 REFERENCE NO : 97462 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 11:5~ PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/10/ 9 ORIGIN : FLIC REEL NAME : 97462 CONTINUATION # : PREVIOUS REEL : CO~ViENT : B.P. EXPLORATION, PRUDHOE BAY Z-03, API #50-029-22787-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/10/ 9 ORIGIN : FLIC TAPE NA24E : 97462 CONTINUATION # : 1 PREVIOUS TAPE COFk~_JVT : B.P. EXPLORATION, PRUDHOE BAY Z-03, API #50-029-22787-00 TAPE HEADER PRUDHOE BAY MWD/MADLOGS WELL NAME: API AUJPIBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING Z-03 500292278700 BP EXPLORATION (ALASKA) SCHLUMBERGER WELL SERVICES 9-0CT-97 BIT RUN 1 97462 KUNTZ /NUTTER COPEN BIT RUN 2 BIT RUN 3 19 llN 12E 976 1427 83.75 82.25 29. O0 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 3104.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 11:51 3RD STRING PRODUCTION STRING THIS FILE CONTAINS THE LDWGEDIT FOR Z-03 MWD GR. THE GR WAS DEPTH SHIFTED TO THE OPEN HOLE SWS BHC GR LOGGED 20-SEP-97. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED MERGEDMWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREFiENT: 0.5000 FILE SUFmD%RY LDWG TOOL CODE $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 3100.0 9652.0 BASELINE DEPTH 88888.0 6916.0 6897.0 6842.0 6806.0 6746.0 6725.0 6707.0 6673.5 6649.5 6580.5 6531.5 6516.5 6479.5 6418.5 6373.0 6312.5 6270.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... MWD 88881.0 6909.0 6891.0 6836.0 6800.0 6739.5 6717.5 6700.0 6666.5 6643.5 6573.0 6521.5 6506.5 6469.5 6408.5 6362.5 6302.5 6259.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 6228.5 6204.5 6154.0 6127.0 6087.5 6035.0 5987.5 5926.5 5875.0 5765.0 5704.0 5667.0 5585.0 5560.0 5504.5 5479.0 5424.0 5373.0 5307.0 5281.0 5253.5 5214.0 5167.5 5113.5 5073.5 5013.5 4958.5 4890.5 4859.0 4788.5 4759.0 4719.5 4696.0 4634.5 4602.0 4579.0 4528.0 4497.0 4480.5 4354.0 4299.0 4250.5 4193.5 4171.5 4103.5 4070.0 4009.5 3960.5 3919.0 3862.5 3846.5 3782.0 3746.5 3724.0 3690.0 6217.5 6194.0 6143.5 6116.0 6077.0 6024.0 5976.0 5915.5 5864.5 5754.0 5692.0 5655.5 5572.5 5548.0 5491.5 5466.0 5411 5 53 60 0 5294 5 5268 5 5240 5 5201 0 5155.0 5101.0 5059.0 5000.5 4944.5 4877.5 4846.5 4776.5 4746.0 4706.0 4682.0 4621.5 4590.0 4565.5 4515.0 4484.0 4466.5 4340.5 4287.0 4238.5 4180.0 4159.5 4091.5 4056.5 3998.0 3948.5 3906.0 3850.0 3833.5 3770.0 3734.0 3711.5 3677.0 9-0CT-1997 11:5~ PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 11:5~ PAGE: 3663.0 3647.0 3604.0 3565.0 3523.5 3473.0 3436.5 3417.0 3397.5 3298.5 3214.5 3149.5 100.0 $ ~iERGED DATA SOURCE LDWG TOOL CODE .............. $ REMARKS: 3650.0 3634.0 3592.0 3552.5 3511.0 3460.0 3424.5 3403.5 3384.0 3286.5 3201.0 3136.0 86.5 BIT RUN NO. MERGE TOP MERGE BASE THIS FILE CONTAINS THE EDITED AND CLIPPED FILE FOR MWDREAL TIME GR RUN20-SEP-1997. $ LIS FORMAT DATA ** DATA FO~T SPECIFICATION RECORD ** ** SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 2 3 4 66 5 66 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 66 0 66 0 73 20 1 0.5 FT 51 0 FT 68 1 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 11:5i PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 GRRWMWD AAPI O0 000 O0 0 1 1 1 4 68 0000000000 GRIN MWD AAPI O0 000 O0 0 1 1 1 4 68 0000000000 ROP MWD FPHR O0 000 O0 0 1 1 1 4 68 0000000000 GR BHC GAPI O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10147.000 GR.BHC 41.389 DEPT. 3104.000 GR.BHC 71.002 GRRW.MWD -999.250 GRIN. MWD -999.250 ROP.MWD GRRW. MWD -999.250 GRIN. MWD -999.250 ROP.MWD -999.250 -999.250 ** END OF DATA **** FILE TRAILER **** FILE NA2ViE : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE · 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: 0.5000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 11 ..Sx PAGE: FILE SUI~VARY VENDOR TOOL CODE START DEPTH MWD 3100.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY or REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9652.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAR~iA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OBI~M) AT TEMPERATURE (DEGF) : MUD AT $4EASURED TEMPERATURE (MT): MUD AT MAX CIRCULATIONG TEMPERATURE : MUD FILTRATE AT (MT): MUD CAKE AT (MT): NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 20-SEP-97 IDEAL 2. OA- 010 4.0C REAL- TIME 9713.0 3100.0 9713.0 34.0 TOOL NUMBER MWD GR 8.500 3104.0 LSND 52.0 WARNING: DEPTH REFERENCE MAY NOT BE FINAL DEPTH REFERENCE: FINAL DEPTH MAY BE SHIFTED TO WL REF. DATA GAP BETWEEN 4385 ?T AND 4466 FT DUE TO SURFACE SYSTEM FAILURE. LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 11:5~ PAGE: NO REPEAT SECTION WAS DONE BECAUSE JUDGED UNNECESSARY. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 GR MWD AAPI O0 000 O0 0 2 1 1 4 68 0000000000 GR INT AAPI O0 000 O0 0 2 1 1 4 68 0000000000 ROPSMWD F/HR O0 000 O0 0 2 1 1 4 68 0000000000 ROP5 INT F/HR O0 000 O0 0 2 1 1 4 68 0000000000 VDEPMWD FT O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9713.500 GR.MWD -999.250 ROPS.INT 75.330 VDEP.MWD 8737.711 DEPT. 3106.500 GR.MWD -999.250 ROPS.INT -999.250 VDEP.MWD -999.250 GR.INT -999.250 ROPS.MWD 75.330 GR.INT 70.900 ROPS.MWD -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 11:5~ PAGE: ** END OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAM~ : EDIT DATE : 97/10/ 9 ORIGIN : FLIC TAPE NA~4~ : 97462 CONTINUATION # : 1 PREVIOUS TAPE : COf~4~f : B.P. EXPLORATION, PRUDHOE BAY Z-03, API #50-029-22787-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/10/ 9 ORIGIN : FLIC REEL NA~E : 97462 CONTINUATION # : PREVIOUS REEL : COf4~_~Ff : B.P. EXPLORATION, PRUDHOE BAY Z-03, API #50-029-22787-00 2GGL 9 L 130 I£1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14~0CT-1997 16:13 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/10/14 ORIGIN · FLIC REEL NAMi~ : 97450 CONTINUATION # : PREVIOUS REEL : CO~4ENT : BP EXPLORATION, PRUDHOE BAY, Z-03, 50-029-22787-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/10/14 ORIGIN : FLIC TAPE NAM~ : 97450 CONTINUATION # : 1 PREVIOUS TAPE : COMPiENT : BP EXPLORATION, PRUDHOE BAY, Z-03, 50-029-22787-00 TAPE HEADER Prudhoe Bay CASED HOLE WIRELINE LOGS WELL NA~E: Z-03 API NUMBER: 500292278700 OPERATOR: BP Exploration LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 14-0CT-97 JOB NUMBER: 97450 LOGGING ENGINEER: E. BARTZ OPERATOR WITNESS: M. JACKSON SURFACE LOCATION SECTION: 19 TOWNSHIP: 1 iN RANGE: 12E FNL: 976 FSL : FEL: FWL: 1427 ELEVATION (FT FROM MSL O) KELLY BUSHING: 83.75 DERRICK FLOOR: 82.25 GROUND LEVEL: 29. O0 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 8.500 7. 000 9700.0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:13 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: MWD LDWG CURVE CODE: GR RUN NUMBER: 1 PASS NUMBER: 1 DATE LOGGED: 20-SEP-97 LOGGING COMPANY: SCHLUMBERGER WELL SERVICES BASELINE DEPTH 88888.0 7591.5 7570.5 7545.0 7500.0 7498.5 7484.0 7468.5 7440.5 7414.0 7409.0 7391.5 7390.5 73 68.5 73 62.0 7358.0 7347.5 7331.0 7330.0 7314.5 7301.5 7290.5 7287.5 7285.0 7275.0 7268.0 7240.5 7230.0 7210.0 7206.0 100.0 $ .......... EQUIVALENT UNSHIFTED DEPTH GRCH RST 88880.5 88880.5 7584.0 7584.0 7563.0 7563.0 7536.0 7536.0 7491.5 7491.5 7475.5 7460.5 7460.0 7428.0 7406.0 7398.0 7381.5 7379.5 7362.0 7354.0 7349.5 7339.0 7324.5 7321.5 7307.0 7307.0 7294.0 7294.0 7285.0 7279.0 7277.5 7279.0 7269.5 7260.5 7261.0 7234.0 7222.5 7201.5 7198.5 92.5 91.5 CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE SIGMA MODE RST DATA ACQUIRED ON BP EXPLORATIONS Z-03 WELL. THE DEPTH SHIFT SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH RST AND THE MWD GR, SIGM RST AND THE MWD GR CARRYING ALL RST CURVES WITH THE SIGM SHIFTS. ONLY ONE SIGMA MODE RST PASS WAS ACQUIRED. $ $ PAGB : LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:13 PAGE: **** FILE HEADER **** FILE NA~E : EDIT .001 SERVICE : FLIC VERSION ' O01CO1 DATE : 97/10/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUM~ER: 1 DEPTH INCREMENT: 0.5000 FILE SO?4M3~RY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 7616.0 7194.0 RST 7636.0 7223.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH RST ............................ $ REMARKS: THIS FILE CONTAINS THE ONLY RST SIGMA MODE PASS MADE. NO PASS TO PASS TO SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:13 PAGE: TYPE REPR CODE VALUE 4 66 1 5 66 6 73 7 65 8 68 O.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN** NAME SERV UNIT SERVICE APIAPI API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 1 1 1 4 68 0000000000 DEPT FT 1022692 NBAC RST CPS 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 FBAC RST CPS 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 SBNA RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 SFNA RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 SBFA RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 SFFA RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 TRAT RST 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 IRAT RST 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 CIRNRST 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 CIRFRST 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 BSALRST PPK 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 SIBF RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 TPHI RST PU-S 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 SFFC RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 SFNC RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 SIGM RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 DSIG RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 TENS RST LB 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH RST API 1022692 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 7628.500 NBAC.RST 3735.281 FBAC.RST 3894.979 SBNA.RST SFNA.RST 37.651 SBFA.RST 45.769 SFFA.RST 39.281 TRAT.RST IRAT.RST 0.475 CIRN. RST 0.602 CIRF.RST 0.936 BSAL.RST SIBF.RST 35.566 TPHI.RST 48.673 SFFC.RST 38.024 SFNC.RST SIGM.RST 38.130 DSIG.RST -0.393 TENS.RST 2839.000 GRCH.RST 52.743 1.356 38.342 38.498 -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:13 PAGE: DEPT. 7186.500 NBAC.RST SFNA.RST -999.250 SBFA.RST IRAT.RST -999.250 CIRN. RST SIBF.RST -999.250 TPHI.RST SIGM. RST -999.250 DSIG.RST -999.250 FBAC.RST -999.250 SFFA.RST -999.250 CIRF. RST -999.250 SFFC.RST -999.250 TENS.RST -999.250 -999.250 -999.250 -999.250 -999.250 SBNA . RST TRAT.RST BSAL . RST SFNC. RST GRCH. RST -999.250 -999.250 -999.250 -999.250 84.624 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 97/10/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 2 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMiBER: 1 DEPTH INCREME~VT: 0.5000 FILE SUF~VARY VENDOR TOOL CODE START DEPTH RST 7636.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : STOP DEPTH 7194.0 26-SEP-97 8C0-609 630 26-SEP-97 10187.0 7636.0 7194.0 7636.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14~0CT-1997 16:13 PAGE: LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAlEnA RAY RST RESERVOIR SATURATION $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (?T) LOGGERS CASING DEPTH (FT) 1800.0 NO TOOL NUMBER CGRS-A RST-A 8.500 9700.0 9700.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : BRINE 8.50 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE (CPS): NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): 1.0 RE~IARI<S: 1 SIGM PASS LOGGED @1800 FPH 4 IC PASSES LOGGED @240 FPH EA. 4 STATION LOGGING IC PASSES LOGGED FOR 9 MIN. EA. STATION LOGS WERE TAKEN @ THE FOLLOWING DETECTOR DEPTHS: 7460', 7506', 7537', & 7597'. ALL LOGS TIED TO ANADRILL MWD GR LOG (20-SEP-97) THIS FILE CONTAINS THE RAW DATA FOR THE ONLY SIGMA MODE RST PASS MADE. LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:13 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 376 4 66 1 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 2 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CS RST F/HR 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 TENS RST LB 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 NPHVRST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 NPDE RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 NSCE RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CRRARST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 NSCR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 AQTMRST S 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CHV RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CPSV RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CP2V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 Cl~2V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RCFR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RCLC RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RCRC RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RCAKRST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RTDF RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 FPHVRST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 FPDE RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 FSCE RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 FSCR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 AQTF RST S 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SF6P RST PSIG 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:13 PAGE: 8 NA~IE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) HVPV RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 BMCU RST UA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 GDCU RST MA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 EXCU RST UA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 1VBEF RST UA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 ?BEF RST UA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 NPGF RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 FPGF RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 BSTR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 BSPR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 MARC RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 ~24V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 XPSV RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 XP2V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 ~2V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RXFR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RXLC RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 PO~C RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RXAKRST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SHCU RST MA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 BSALRST PPK 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 BSAL SIG PPK 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CIRNRST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CIRF RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CIRNFIL 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CIRF FIL 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 DSIG RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC RST CPS 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 IRAT RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 IRAT FIL 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 I~BACRST CPS 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SFNA RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SFFA RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SBNA RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SBFA RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SFNA SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SFFA SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SBNA SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SBFA SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SFNA FIL CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SFFA FIL CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SBNA FIL CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SBFA FIL CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SIBF RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SFNC RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SFFC RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SIGM RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SIBF SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SIGM SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SIGMR2P CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 SIBH R2P CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:13 PAGE: 9 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE C~S MOD NUMB SAMP ELEM CODE (HEX) TRAT RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT SIG 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT FIL 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CRNI RST K}tZ 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CRFI RST KHZ 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RDIX RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RSCS RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CTM RST DEGC 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 XTM RST DEGC 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 TAV RST ICV 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 FICU RST AMP 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 CACU RST AMP 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 BUST RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 BUSP RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 RSXS RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI RST PU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI SIG PU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI R2P PU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 GR RST GAPI 1022692 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. NPDE.RST 1528.550 NSCE.RST AQTM. RST CM2V. RST RCAK. RST FSCE.RST HVPV. RST NBEF.RST BSTR.RST XPSV. RST RXLC.RST 7650.000 CS.RST 1434.263 TENS.RST 2148.000 NPHV. RST 1550.294 2.836 CRRA.RST 2.111 NSCR.RST 0.092 0.661 CHV.RST 201.339 CPSV. RST 5.019 CP2V. RST 12.173 -12.211 RCFR.RST 0.000 RCLC.RST 0.000 RCRC.RST 0.000 0.000 RTDF.RST 0.000 FPHV. RST 1516.114 FPDE.RST 1507.989 2.685 FSCR.RST 0.077 AQTF. RST 0.661 SF6P.RST 143.677 169.190 BMCU. RST 36.035 GDCU. RST 59.848 EXCU. RST 15.090 22.203 FBEF.RST 46.876 NPGF. RST 0.994 FPGF.RST 1.004 20.157 BSPR.RST 1.140 MARC. RST 0.000 XHV. RST 198.674 5.117 XP2V. RST 12.187 X~2V. RST -12.466 RXFR.RST 0.000 0.000 RXRC.RST 0.000 RXAK. RST 0.000 SHCU. RST 30.243 BSAL.RST -999.250 BSAL.SIG -999.250 CIRN. RST -999.250 CIRF. RST -999.250 CIRN. FIL -999.250 CIRF. FIL -999.250 DSIG.RST -999 250 FBAC.RST -999.250 IRAT.RST -999.250 IRAT. FIL -999.250 NBAC.RST -999 250 SFNA.RST -999.250 SFFA.RST -999.250 SBNA.RST -999.250 SBFA.RST -999 250 SFNA.SIG -999.250 SFFA.SIG -999.250 SBNA.SIG -999.250 SBFA.SIG -999 250 SFNA.FIL -999.250 SFFA.FIL -999.250 SBNA.FIL -999.250 SBFA.FIL -999 250 SIBF. RST -999.250 SFNC.RST -999.250 SFFC.RST -999.250 SIGM. RST -999250 SIBF. SIG -999.250 SIGM. SIG -999.250 SIGM. R2P -999.250 SIBH.R2P -999.250 TRAT. RST -999.250 TRAT.SIG -999.250 TRAT. FIL -999.250 CRNI.RST 446.132 CRFI.RST 211.317 RDIX.RST 8191.000 RSCS.RST 8459.000 CTM. RST 64.941 XTM. RST 62.500 TAV. RST 94.888 FICU. RST 2.344 CACU. RST 2.778 BUST.RST 0.000 BUSP.RST 0.000 RSXS.RST 8878.000 TPHI.RST -999.250 TPHI.SIG -999.250 TPHI.R2P -999.250 GR.RST 47.105 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:13 PAGE: 10 DEPT. NPDE. RST AQTM. RST CM2 V. RS T RCAK. RST FSCE. RST HVPV. RST NBEF. RST BSTR . RST XP5 V. RST RXLC. RST BSAL. RST CIRN. FIL IRA T. RS T SFFA. RST SFFA. SIG SFFA. FIL SFNC. RST SIGM. SIG TRAT. SIG RDIX. RST TA V. RST BUSP. RST TPHI.R2P 7193.500 1531. 678 O. 661 -12. 250 0 000 2 794 169 971 24 488 19 832 5 090 0 000 33 593 O. 696 0.497 39.242 0. 928 37. 872 36.414 O. 686 O. 029 21850. 000 94. 926 O. 000 51.229 CS.RST NSCE. RST CHV.RST RCFR. RST RTDF. RST FSCR. RST BMCU. RST FBEF. RST BSPR. RST XP2V. RST RXRC. RST BSAL. SIG CIRF. FIL IRAT. FIL SBNA . RST SBNA. SIG SBNA. FIL SFFC. RST SIGM. R2P TRA T. FIL RSCS. RST FICU. RST RSXS. RST GR.RST 1771. 241 TENS. RST 2. 979 CRRA. RST 200. 854 CPSV. RST O. 000 RCLC.RST O. 000 FPHV. RST O. 042 AQTF. RST 39. 824 GDCU. RST 50. 015 NPGF. RST 1. 153 MARC. RST 12. 221 3Q~2V. RST O. 000 RXAK. RST 2. 734 CIRN. RST 1 . 051 DSIG. RST O. 495 NBAC. RST 54 . 982 SBFA. RST 2. 749 SBFA. SIG 52. 554 SBFA. FIL 36. 419 SIGM. RST 35. 889 SIBH. R2P 1 . 334 CRNI. RST 8463 . 000 CTM. RST 2. 448 CACU. RST 8878. 000 TPHI.RST 84. 624 2371 000 2 042 5 049 0 000 1520 997 0 661 59 881 0 997 0 000 -12 496 0 000 0 692 O. 900 2526. 400 43. 011 4. 026 44. 519 36.390 51.156 464. 006 61. 523 2. 782 48.197 NPHV. RST NSCR. RST CP2 V. RST RCRC.RST FPDE. RST SF6P. RST EXCU. RST FPGF. RST XHV. RST RXFR . RST SHCU. RST CIRF. RST FBAC. RST SFNA. RST SFNA. SIG SFNA. FIL SIBF. RST SIBF. SIG TRAT. RST CRFI. RST XTM. RST BUST. RST TPHI. SIG 1542. 970 -0. 008 12.100 O. 000 1510.507 144.120 14. 683 1. 001 198. 625 O. 000 33. 365 1. 080 3315. 936 36. 631 O. 689 36. 024 33. 871 O. 973 1.334 227.184 60. 449 O. 000 1.430 ** END OF DATA ** * * * * FILE TRAILER * * * * FILE NA~fE : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAFiE : EDIT DATE : 97/10/14 ORIGIN · FLIC TAPE NAFIE : 97450 CONTINUATION # : 1 PREVIOUS TAPE : CO~ : BP EXPLORATION, PRUDHOE BAY, Z-03, 50-029-22787-00 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:13 PAGE: 11 **** REEL TRAILBR **** SERVICE NA~E : EDIT DATE : 97/10/14 ORIGIN : FLIC REEL NAM~ : 97450 CONTINUATION # .. PREVIOUS REEL : CO~NT '. BP EXPLORATION, PRUDHOE BAY, Z-03, 50-029-22787-00 166[ ;~;~ 130 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: **** REEL HEADER **** SERVICE NAM~ : EDIT DATE : 97/10/15 ORIGIN : FLIC REEL NAME : 97440 CONTINUATION # PREVIOUS REEL : COM~fEJTT ' B.P. EXPLORATION, Z-03, PRUDHOE BAY, API #50-029-22787-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/10/15 ORIGIN : FLIC TAPE NAM~ : 97440 CONTINUATION # : 1 PREVIOUS TAPE : CO~IENT : B.P. EXPLORATION, Z-03, PRUDHOE BAY, API #50-029-22787-00 TAPE HEADER PRUDHOE BAY OPEN HOLE WIRELINE LOGS WELL NAM~ : API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: ELEVATION (FT FROM MSL O) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: RUN 1 97440 KIRKBY COPEN WELL CASING RECORD 1ST STRING 2ND STRING Z-03 500292278700 BP EXPLORATION (ALASKA) SCHLUMBERGER WELL SERVICES 15-0CT~97 RUN 2 97440 KIRKBY GRABB RUN 3 19 lin 12E 976 1427 83.75 82.25 29. O0 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 3104.0 6.000 7.000 9700.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 3RD STRING PRODUCTION REM_ARKS: STRING This file contains the LDWG Composite OHEDIT for BP Exploration well Z-03, logged 20-SEP-1997 and 24-SEP-1997. The intermediate portion (RUN 1) ~as logged in 8-1/2 hole. The TD portion (RUN 2) was run in 6" hole after intermediate casing was set. This log (BHCS/GR) is considered the primary depth control for any future logs. Logged from 6990 - 3000 and 9700 - 10147 ft md. There are no open hole logs between 6990 - 9700 ft md. ***NOTE*** The AIT rssistivity is NOT CORRECT due to damage to the AIT while trying to spud through a bridge at 7000 ft. The log was not rerun at the request of the BP well site representative and the driller who recommended that the hole conditions was deteriorating and that casing should be set immedidately. A second tool was on location and was ready to run had the hole conditions been better. Since then the AIT tool has been sent back to Houston to be rebuilt. The 90 inch and the 60 inch investigation measurements are not present because the values are not correct. The other investigation depths are presented only for qualitative information and to aid with bed thickness determination. $ PAGE: **** FILE HEADER **** FILE NA~E : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE H~ER FILE NUM~ER: 1 EDITED OPEN HOLEMAIN PASS Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data. DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH PEX 10168.0 9700.0 BCS 10140.0 9700.0 $ BASELINE CURVE FOR SHIFTS: NONE LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: CURVE SHIFT DATA (PiEASUREDDEPTH) .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH PEX MERGED DATA SOURCE LDWG TOOL CODE RUN NO. PASS NO. PEX 1 1 BCS 1 1 PEX 2 1 BCS 2 1 $ MERGE TOP MERGE BASE 3104.0 6990.0 3104.0 6918.0 9700.0 10168.0 9700.0 10140.0 REMARKS: This file contains the merged and clipped data for the Array Induction tool (AIT), and Platform Express Lithodensity (SDN), Compensated Neutron (CNT) and Borehole Sonic tool (BHC). No depth corrections were applied as this is the primary depth control. **NOTE** Post logging problems prevented all the data from Run 2 from being provided. Only data presented on the prints is available. The composited/edited data is that data available in both runs. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE APIAPI API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 1 1 1 4 68 0000000000 DEPT FT 1022691 SP AIT MV 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 GR AIT GAPI 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 TENS AIT LB 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 ~ES AIT 0~1022691 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNT CPS 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNT CPS 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNT PU-S 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 DT BCS US/F 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 CALl SDN IN 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 DRHO SDN G/C3 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 PEF SDN BN/E 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 RHOB SDN G/C3 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 AFiO AIT OHMM 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 AF20 AIT OH~M1022691 O0 000 O0 0 1 1 1 4 68 0000000000 AF30 AIT OHT~I 1022691 O0 000 O0 0 1 1 1 4 68 0000000000 AF60 AIT 0H~1022691 O0 000 O0 0 1 1 1 4 68 0000000000 AF90 AIT OH~M1022691 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10187.000 ~fl~ES.AIT 0.037 DT.BCS -999.250 RHOB.SDN -999.250 AF60.AIT -999.250 DEPT. 3104.000 I4~ES.AIT 1.352 DT. BCS 135.938 RHOB.SDN 2.237 AF60.AIT -999.250 SP.AIT -999.250 GR.AIT -999.250 TENS.AIT CNTC. CNT -999.250 CFTC. CNT -999.250 NPHI.CNT CAL1.SDN -999.250 DRHO.SDN -999.250 PEF.SDN AFiO.AIT -999.250 AF20.AIT -999.250 AF30.AIT AF90.AIT -999.250 SP.AIT 12.813 GR.AIT 71.002 TENS.AIT CNTC. CNT 2024.896 CFTC. CNT 603.870 NPHI.CNT CAL1.SDN 3.819 DP~HO.SDN 0.101 PEF. SDN AFiO.AIT 5.808 AF20.AIT 16.283 AF30.AIT AF90.AIT -999.250 5449.000 -999.250 -999.250 -999.250 2121.000 48.533 6.492 13.945 ** END OF DATA ** **** FILE TRAILER **** FILE NA~IE : EDIT .001 SERVICE · FLIC VERSION ' O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NLrM~ER: 2 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUFI~ER : 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH PEX 3104.0 $ BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (MEASURED DEPTH) STOP DEPTH 2964.0 BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... PEX ....... This file contains the open hole logs run up into casing for RUN 1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 48 4 66 1 5 66 6 73 7 65 8 68 O. 5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: TYPE REPR CODE VALUE 9 65 FT 11 66 21 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) O0 000 O0 0 2 1 1 4 68 0000000000 DEPT FT 1022691 TENS AIT LB 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 TEND AIT LB 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 GRCHAIT GAPI 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNT CPS 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNT CPS 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNT 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNT PU-S 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 CPHI CNT PU-S 1022691 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 3104.000 TENS.AIT 2121.000 TEND.AIT 1047.560 GRCH.AIT CNTC. CNT 2024.896 CFTC. CNT 603.870 FCNT. CNT 539.786 NCNT. CNT CRAT. CNT 3.494 NRAT. CNT 3.611 NPHI.CNT 48.533 CPHI.CNT DEPT. 2964.000 TENS.AIT 2007.000 TEND.AIT 1028.056 GRCH.AIT CNTC. CNT 1338.990 CFTC. CNT 378.160 FCNT. CNT 385.175 NCNT. CNT CRAT. CNT 3.801 N~AT. CNT 4.167 NPHI.CNT 54.121 CPHI.CNT 71. 002 1917. 423 40. 408 45.083 1272.632 43.420 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 M_AX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER: 3 EDITED CASED HOLE MAIN PASS Depth shifted and clipped curves for open hole logs run into casing. PASS NUM~ER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH PEX 9700.0 $ BASELINE CURVE FOR SHIFTS: NONE CURVE SHIFT DATA (M~SUREDDEPTH) STOP DEPTH .......... 9578.0 BASELINE DEPTH .............. $ .......... EQUIVALENT UNSHIFTED DEPTH .......... PEX ....... REMARKS: This file contains the open hole logs run up into casing for RUN 2. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 8 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE AUJMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 3 1 1 4 TENS AIT LB 1022691 O0 000 O0 0 3 1 1 4 GRCH AIT GAPI 1022691 O0 000 O0 0 3 1 1 4 CNTC CNT CPS 1022691 O0 000 O0 0 3 1 1 4 CFTC CNT CPS 1022691 O0 000 O0 0 3 1 1 4 NPHI CNT PU-S 1022691 O0 000 O0 0 3 1 1 4 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 ** DATA ** DEPT. 9700.000 TENS.AIT 5290.000 GRCH.AIT CFTC. CNT 1036.842 NPHI.CNT 23.349 DEPT. 9578.000 TENS.AIT 5245.000 GRCH.AIT CFTC. CNT 397.280 NPHI.CNT 44.781 49.396 CNTC. CNT 103.589 CNTC. CNT 2210.464 1244.315 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: **** FILE TRAILER **** FILE NAlViE : EDIT .003 SERVICE . FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAM~E : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING ~ER: PASS NU~BER: DEPTH INCREMENT: FILE SU14MARY FILE HEADER FILE NUMBER 4 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.5000 VEaVDOR TOOL CODE START DEPTH STOP DEPTH AIT 6984.0 3104.0 PEX 6984.0 3104.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.0 3000.0 6960.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. TOOL NUMBER ........... DSLC-B 817B LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 10 SDT PEX AIT $ ARRAY SONIC SONDE PLATFORM EXPRESS ~Y INDUCTION TOOL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OH~2q) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SLS-W 1408 HTBCC 794 AIT-H 121 8.500 3104.0 3104.0 WATER BASED MUD 10.50 61.0 9.4 212.0 1. 890 65.0 1. 690 65.0 2. 290 65.0 RE~ARJ~S: ************ RUN 1 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOFF RUN ON THE AITH BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. lqqIS IS THE RAW (OPEN HOLE) MAIN PASS PEX/AIT DATA SAMPLED AT 0.5' SAMPLE RATES. $ LIS FORMAT DATA TOOL STANDOFF (IN): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SAArD S TONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): 8.500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 11 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 136 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 7 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 SP AIT MV 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 GR AIT GAPI 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 TENS AIT LB 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 HTENAIT LB 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 I~RES AIT OHT4M1022691 O0 000 O0 0 4 1 1 4 68 0000000000 MTEMAIT DEGF 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 GDEVAIT DEG 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC PEX CPS 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC PEX CPS 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 RCFT PEX CPS 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 RCNT PEX CPS 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 TNRA PEX 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 RTNR PEX 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 TNPH PEX PU 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI PEX PU 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 NPOR PEX PU 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 DT BHC US/F 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 TT1 BHC US 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 TT2 BHC US 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 TT3 BHC US 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 TT4 BHC US 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 HCAL PEX IN 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 RHOZ PEX G/C3 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 HDRA PEX G/C3 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 PEFZ PEX 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 12 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DPHZ PE~ PU 1022691 O0 000 O0 0 4 1 1 4 68 0000000000 HMIN PEX 0H~1022691 O0 000 O0 0 4 1 1 4 68 0000000000 H~NO PEX 0H~I1022691 O0 000 O0 0 4 1 1 4 68 0000000000 RXOZ PEX 0~1022691 O0 000 O0 0 4 1 1 4 68 0000000000 RX08 PEX 0H~1022691 O0 000 O0 0 4 1 1 4 68 0000000000 AFiO AIT 0H~1022691 O0 000 O0 0 4 1 1 4 68 0000000000 AF20 AIT 0~1022691 O0 000 O0 0 4 1 1 4 68 0000000000 AF30 AIT 0P~4~1022691 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 6984.000 SP.AIT 10.375 GR.AIT 149.126 TENS.AIT 2403.000 HTEN.AIT 622.251 FiRES.AIT 0.853 MTE~.AIT 129.998 GDEV. AIT -999.250 CNTC.PEX 1605.616 CFTC.PEX 734.794 RCFT. PEX 638.266 RCNT. PEX 1508.393 TNRA.PEX 2.233 RTNR.PEX 2.407 TNPH. PEX 22.351 NPHI.PEX 26.809 NPOR.PEX 21.767 DT.BHC 109.609 TT1.BHC 700.234 TT2.BHC 483.906 TT3.BHC 689.922 TT4.BHC 467.813 HCAL.PEX 3.867 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX -999.250 DPHZ.PEX 60721.211 H~IN. PEX 1.863 PL~INO.PEX 1.629 RXOZ.PEX 1.994 RXO8.PEX 1.956 AFiO.AIT 4.037 AF20.AIT 7.794 AF30.AIT 8.642 DEPT. 3104. 000 SP. AIT HTEN.AIT 1047. 560 f~RES.AIT CNTC. PEX 2024. 896 CFTC.PEX TNRA . PEX 3. 494 R TNR . PEX NPOR. PEX 39.190 DT. BHC TT3 . BHC 832. 969 TT4. BHC PiDRA . PEX O . 1 O1 PEFZ . PEX H~VO . PEX O . 354 RXOZ . PEX AF20.AIT 16.283 AF30.AIT 12.813 GR.AIT 1.352 MTEM.AIT 603.870 RCFT.PEX 3.611 TNPH. PEX 135.938 TT1.BHC 554.531 HCAL.PEX 6.492 DPHZ.PEX 0.495 RXO8.PEX 13.945 71.002 TENS.AIT 2121.000 93.908 GDEV. AIT 22.304 539.786 RCNT. PEX 1917.423 40.408 NPHI.PEX 48.533 833.750 TT2.BHC 551.953 3.819 RHOZ.PEX 2.237 25.013 H~IN. PEX 0.720 0.342 AFiO.AIT 5.808 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 13 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUFIBER: DEPTH INCREM~aYT : FILE SUM~JL~Y FILE HEADER FILE NUM~ER 5 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 2 2 1 0.5000 VEaVDOR TOOL CODE START DEPTH STOP DEPTH PEX 10187.0 9700.0 BCS 10187.0 9700.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIf4~ CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR AUX. MEAS~S SDT SONIC CARTRIDGE PEX PLATFORM EXPRESS PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 24-SEP-97 8C0-609 800 24-SEP-97 730 24-SEP-97 10187.0 10187.0 9700.0 10140.0 TOOL NUM~ER AAMS-A 850 SDC-CB 17 HILTB-DTB HTBCC 794 AIT-H 121 6.000 9700.0 9700.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 14 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OH~f) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT) .. MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): QUICK DRILN FLUID 8.80 54.0 9.1 225.0 O. 102 65.0 0.106 65.0 0.107 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 RE~3AR3fS: ************ RUN 2 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH THIS IS THE TD LOGGING RUN FOR THIS WELL. FOUR STANDOFFS RUN ON THE SONIC HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROOS TO 5 DEG DATA SAMPLED AT 0.5' SAMPLE RATES. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 15 TYPE REPR CODE VALUE 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE ~ CHAN ** NAME SERVUNIT SERVICE API API API API FILE ~JRiB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 SP AIT MV 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 GR AIT GAPI 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 TENS AIT LB 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 24~ES AIT 0H~4102269i O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PEX CPS 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PEX CPS 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PEX PU 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 DT BHC US/F 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 TT1 BHC US 1022691 O0 000 O0 0 5 I 1 4 68 0000000000 TT2 BHC US 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 TT3 BHC US 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 TT4 BHC US 1022691 O0 000 O0 0 5 i 1 4 68 0000000000 HCAL PEX IN 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 RHOZ PEX G/C3 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 I~DRA PEX G/C3 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 PEFZ PEX 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 AFiO AIT 0HI~41022691 O0 000 O0 0 5 1 1 4 68 0000000000 AF20 AIT 0H~4102269i O0 000 O0 0 5 1 1 4 68 0000000000 AF30 AIT 0t~4 1022691 O0 000 O0 0 5 1 1 4 68 0000000000 AF60 AIT 0H~41022691 O0 000 O0 0 5 1 1 4 68 0000000000 AFgO AIT 0H5~4102269i O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10210.000 SP.AIT 58.625 GR.AIT 46.957 TENS.AIT 24~ES.AIT 0.037 CNTC. PEX 2703.715 CFTC. PEX 1217.734 NPHI. PEX DT. BHC 83.700 TT1.BHC 530.000 TT2.BHC 360.800 TT3.BHC TT4.BHC 378.400 HCAL.PEX 4.075 RHOZ.PEX -999.250 HDRA.PEX PEFZ. PEX -999.250 AFiO.AIT 3.840 AF20.AIT 4.188 AF30.AIT AF60.AIT 5.308 AF90.AIT 4.178 DEPT. 9700.000 SP.AIT -3.813 GR.AIT 49.396 TENS.AIT lziRES.AIT 0.037 CNTC. PEX 2210.464 CFTC. PEX 1036.842 NPHI.PEX DT. BHC 70.800 TT1.BHC 464.800 TT2.BHC 298.800 TT3.BHC TT4.BHC 275.200 HCAL.PEX 6.512 RHOZ.PEX 3.058 HDRA.PEX 2400.000 25.169 544.000 -999.250 5.071 5290.000 23.349 465.200 0.260 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 16 PEFZ.PEX 10.000 AFiO.AIT AF60.AIT 15.121 A~90.AIT 1950.000 AF20.AIT 21.321 1950.000 AF30.AIT 1950.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAI~E : EDIT .005 SERVICE · FLIC VERSION - O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE 'FLIC VERSION ·OOiCO1 DATE · 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN~ER: TOOL STRING NO?4BER: PASS--ER: DEPTH INCREMENT: FILE SU~ff4ARY FILE HEADER FILE~ER 6 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 1 1 1 0.25000 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 6984.0 3104.0 PEX 6984.0 3104.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TDLOGGER (FT): 20-SBP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 17 TOP LOG INTERVAL {FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. SDT ARRAY SONIC SONDE PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) '. MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : 3000.0 6960.0 TOOL NUMBER DSLC-B 817B SLS-W 1408 HTBCC 794 AIT-H 121 8.500 3104.0 3104.0 WATER BASED MUD 10.50 61.0 9.4 212.0 1.890 65.0 1.690 65.0 2. 290 65.0 REMARKS: ************ RUN 1 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THE RAW (OPEN HOLE) MAIN PASS AIT DATA SAMPLED AT 0.25' SAMPLE RATE. $ LIS FORMAT DATA TOOL STANDOFF (IN): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): 8.500 f~6'fr ~9 '8 £IV'O£8V ~8~'9~ £IV'OW~rV 808 '~ .r. IV'OIS¥ 000 '~Orf £IV'OEWV ~6£'£ £IV'OUS¥ £EO'~ ~IV'Or~ 000'~869 '£d~C I 99 0 r 99 9r 89 99 0 99 ~9 99 ~W g9 6 ~'0 89 8 ~9 ££ 9 99 r 99 9r EL 0 99 0 99 ~ CHOD~ NOI£VDIWID~dS .r. VI4HOW V£V~I ~ f£:rr £66r-£DO-gr LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 19 **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE . FLIC VERSION - O01CO1 DATE . 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAM~E : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE . 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NI]M~ER: TOOL STRING NUM~ER: PASS NUM~ER: DEPTH INCREMENT: FILE SUF~WzARY FILE HEADER FILE~ER 7 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 2 2 1 0.25000 VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 10187.0 9700.0 BCS 10187.0 9700.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TI~iE CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR AUX. MEAS~S 24-SEP-97 8C0- 609 800 24-SEP-97 730 24-SEP-97 10187.0 10187.0 9700.0 10140.0 TOOL NUMBER ........... AAMS-A 850 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 20 SDT PEX P~ AIT $ SONIC CARTRIDGE PLATFORM EXPRESS PLATFORM EXPRESS ARRAY INDUCTION TOOL SDC-CB 17 HILTB-DTH HTBCC 794 AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) '. 6.000 9700.0 9700.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G) '. MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3) '. MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OH~) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT) '. MUD CAKE AT (BHT): QUICK DRILN FLUID 8.80 54.0 9.1 225.0 O. 102 65.0 0.106 65.0 0.107 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) '. THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 RENIARKS: ************ RUN 2 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH THIS IS THE TD LOGGING RUN FOR THIS WELL. FOUR STANDOFFS RUN ON THE SONIC HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG DATA SAMPLED AT 0.25' SAMPLE RATES. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 21 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1022691 O0 000 O0 0 7 1 1 4 68 0000000000 AFiO AIT OP~4~ 1022691 O0 000 O0 0 7 1 1 4 68 0000000000 AF20 AIT OHMM 1022691 O0 000 O0 0 7 1 1 4 68 0000000000 AF30 AIT 0P~4~1022691 O0 000 O0 0 7 1 1 4 68 0000000000 AF60 AIT OHMM1022691 O0 000 O0 0 7 1 1 4 68 0000000000 AF90 AIT 0Ek4~1022691 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 10210.000 AFiO.AIT 3.840 AF60.AIT 5.308 AF90.AIT 4.178 DEPT. 9700.000 AFIO.AIT 1950.000 AF60.AIT 15.121 AFgO.AIT 21.321 AF20.AIT 4.188 AF30.AIT AF20.AIT 1950.000 AF30.AIT 5. 071 1950.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 22 **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE .FLIC VERSION .O01CO1 DATE · 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NtC~ER : DEPTH INCREMENT: FILE SOW~NLgY FILE H~ER FILE NUMBER 8 P~AW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) follo~/ed by files for other main pass tool strings per run. 1 1 1 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 6984.0 3104.0 PEX 6984.0 3104.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TII4~ CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) '. BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.0 3000.0 6960.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. TOOL NUMBER ........... DSLC-B 817B LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 23 SDT PEX AIT $ ARRAY SONIC SONDE PLATFORM EXPRESS ARRAY INDUCTION TOOL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~ff~) AT TEMPERATURE (DEGF) : MUD AT ~4EASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : SLS-W 1408 HTBCC 794 AIT-H 121 8.500 3104.0 3104.0 WATER BASED MUD 10.50 61.0 9.4 212.0 1. 890 65.0 1. 690 65.0 2. 290 65.0 REMARKS: ************ RUN 1 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOFF RUN ON THE AITH BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THE RAW (OPEN HOLE) MAIN PASS AIT DATA SAMPLED AT 0.25' SAMPLE RATE. THIS IS THE RAW (OPEN HOLE) MAIN PASS PEX DATA SAMPLED AT 0.1667' SAMPLE RATE. $ LIS FORMAT DATA TOOL STANDOFF (IN): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): 8. 500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 24 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE i 66 0 2 66 0 3 73 80 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUNiB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 RHOZ PEX G/C3 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 HDRA PEX G/C3 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 PEFZ PEX 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 DPHZ PEX PU 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 H~IN PEX 0H~$1022691 O0 000 O0 0 8 1 1 4 68 0000000000 H~NO PEX 0H~1022691 O0 000 O0 0 8 1 1 4 68 0000000000 RXOZ PEX OH~M1022691 O0 000 O0 0 8 1 1 4 68 0000000000 RX08 PEX 0H~I~I1022691 O0 000 O0 0 8 1 1 4 68 0000000000 HCNT PEX CPS 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 HCFT PEX CPS 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 HGR PEX GAPI 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 RHFT PEX CPS 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 RI~FfPEX CPS 1022691 O0 000 O0 0 8 i 1 4 68 0000000000 HTNP PEX PU 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 HNPO PEX PU 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 TT1 BHC US 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 TT2 BHC US 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 TT3 BHC US 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 TT4 BHC US 1022691 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 25 DEPT. 6984. 000 RHOZ. PEX DPHZ.PEX 60721.211 HMIN. PEX RXO8 . PEX 1.956 HCNT. PEX RHFT. PEX 638.2 66 RHNT. PEX TT1 .BHC 700.234 TT2.BHC DEPT. 3104.000 RHOZ.PEX DPHZ.PEX 25.013 HMIN. PEX RJfO8 . PEX 0.342 HCNT. PEX RHFT. PEX 516. 021 RHNT. PEX TT1 . BHC 833. 750 TT2. BHC -999. 250 HDRA. PEX 1.863 HMNO . PEX 1605. 615 HCFT. PEX 1508. 393 HTNP. PEX 483. 906 TT3. BHC 2.237 I{DRA.PEX 0.720 PmlNO. PEX 2018.829 HCFT. PEX 1904.683 HTNP. PEX 551.953 TT3.BHC -999.250 PEFZ.PEX 1.629 RXOZ.PEX 734.794 HGR.PEX 22.351 HNPO.PEX 689.922 TT4.BHC 0.101 PEFZ.PEX 0.354 RXOZ.PEX 600.059 HGR.PEX 40.587 HNPO.PEX 832.969 TT4.BHC -999 l 149 21 467 6 0 70 39 554 .250 .994 .126 .767 .813 .492 .495 .346 .531 .531 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION · O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION · O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 9 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String ~1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUFi~ER: 2 TOOL STRING NU~BER: 2 PASS ArUMBER: 1 DEPTH INCREMENT: 0.1667 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 10187.0 9700.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 26 BCS $ LOG HEADER DATA 10187.0 DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) LOGGING SPEED (FPHR) : 9700.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR AUX. MEASUREMENTS SDT SONIC CARTRIDGE PEX PLATFORM EXPRESS PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATUR~ (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): ************ RUN2 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG 24-SEP-97 8C0-609 800 24-SEP-97 730 24-SEP-97 10187.0 10187.0 9700.0 10140.0 TOOL NUMBER AAMS-A 850 SDC-CB 17 HILTB-DTB HTBCC 794 AIT-H 121 6.000 9700.0 9700.0 QUICK DRILN FLUID 8.80 54.0 9.1 225.0 O. 102 65.0 O. 106 65.0 O. 107 65.0 THERMAL SANDSTONE 2.65 1.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 27 HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH THIS IS THE TD LOGGING RUN FOR THIS WELL. FOUR STANDOFFS RUN ON THE SONIC HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG DATA SAMPLED AT 0.1667' SAMPLE RATES. $ LIS FORMAT DATA DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 9 1 1 4 68 0000000000 RHOZ PEX G/C3 1022691 O0 000 O0 0 9 1 1 4 68 0000000000 HDRA PEX G/C3 1022691 O0 000 O0 0 9 1 1 4 68 0000000000 PEFZ PEX 1022691 O0 000 O0 0 9 1 1 4 68 0000000000 TT1 BHC US 1022691 O0 000 O0 0 9 1 1 4 68 0000000000 TT2 BHC US 1022691 O0 000 O0 0 9 1 1 4 68 0000000000 TT3 BHC US 1022691 O0 000 O0 0 9 1 1 4 68 0000000000 TT4 BHC US 1022691 O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 28 DEPT. 10210.000 RHOZ. PEX TT1.BHC 530.000 TT2.BHC DEPT. 9700.000 RHOZ.PEX TT1.BHC 464.800 TT2.BHC -999.250 t{DRA.PEX 360.800 TT3.BHC 3.058 HDRA.PEX 298.800 TT3.BHC -999.250 544.000 O. 260 465. 200 PEFZ. PEX TT4. BHC PEFZ. PEX TT4. BHC -999.250 378.400 10.000 275.200 ** END OF DATA ** * * * * FILE TRAILER * * * * FILE NAME : EDIT .009 SERVICE · FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .010 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 10 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 TOOL STRING NUMiBER: 1 PASS NUMBER: 1 DEPTH INCREMENT: 0. 0833 FILE SUMMARY VENDOR TOOL CODE START DEPTH AIT 6984.0 PEX 6984.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: STOP DEPTH 3104.0 3104.0 20-SEP-97 8C0-609 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 29 TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.0 3000.0 6960.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. SDT ARRAY SONIC SONDE PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ TOOL NUMBER ........... DSLC-B 817B SLS-W 1408 HTBCC 794 AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 8.500 3104.0 3104.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TE~IPERATURE (DEGF) RESISTIVITY (O~R4~) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : WATER BASED MUD 10.50 61.0 9.4 212.0 1. 890 65.0 1. 690 65.0 2. 290 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 8.500 TOOL STANDOFF (IN): ************ RUN1 ************* NABORS 1SE THIS IS A PRIMARY DEPT~LOG HOLEFINDER RUN ON THE AITH ONE STANDOFF RUN ON THE AITH BOWSPRING RUN ONNEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THERAW (OPEN HOLE) MAIN PASS AIT DATA SAMPLED AT 0.25' SAMPLERATE. LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 30 THIS IS THE RAW (OPEN HOLE) MAIN PASS PEX DATA SAMPLED AT 0.0833' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN** NAME SERV UNIT SERVICE API API API API FILE AKIf4B NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFiB SAMP ELE~ CODE (HEX) DEPT FT 1022691 O0 000 O0 0 10 1 1 4 68 0000000000 HCAL PEX IN 1022691 O0 000 O0 0 10 1 1 4 68 0000000000 ** DATA ** DEPT. 6984.000 HCAL.PEX 3.867 DEPT. 3104.000 HCAL.PEX 3.819 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 31 ** * * FILE TRAILER * * * * FILE NA~E : EDIT .010 SERVICE · FLIC VERSION : O01CO1 DATE ' 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .011 SERVICE · FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING ~ER: PASS NUMBER: DEPTH INCREMENT: FILE SU~VARY FILE HEADER FILE NUMBER 11 RAW OPEN HOLEMAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 fo Sadlerochit run presented first (primary depth control string used to depth shift the Sadler interval) followed by files for other main pass tool strings per run. 2 2 1 0.0883 VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 10187.0 9700.0 BCS 10187.0 9700.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIf4E CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPH~) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR AUX. MEASUREMENTS 24-SEP-97 8C0-609 800 24-SEP-97 730 24-SEP-97 10187.0 10187.0 9700.0 10140.0 TOOL NUMBER AAMS-A 850 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 32 SDT PEX PEX AIT $ SONIC CARTRIDGE PLATFORM EXPRESS PLATFORM EXPRESS ARRAY INDUCTION TOOL SDC-CB 17 HILTB-DTB HTBCC 794 AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 6.000 9700.0 9700.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OH~) AT TEMPERATURE (DEGF) : MUD AT ~iEASUkED T~4PERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT): MUD CAKE AT (MT): MUD CAKE AT (BHT): QUICK DRILN FLUID 8.80 54.0 9.1 225.0 O. 102 65.0 O. 106 65.0 0.107 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 RE~'/ARKS: ************ RUN 2 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH THIS IS THE TD LOGGING RUN FOR THIS WELL. FOUR STANDOFFS RUN ON THE SONIC HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO $ DEG DATA SAMPLED AT 0.0883' SAMPLE RATES. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center t5-0CT-1997 11:33 PAGE: 33 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 I 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD AUJM~ SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 11 1 1 4 68 0000000000 HCAL PEX IN 1022691 O0 000 O0 0 11 1 1 4 68 0000000000 ** DATA ** DEPT. 10210.000 HCAL.PEX 4.075 DEPT. 9700.000 HCAL.PEX 6.512 ** END OF DATA ** **** FILE TRAILER **** FILE NAM~ : EDIT .011 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 34 **** FILE HEADER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING N[rM~ER PASS NI]M~ER : DEPTH INCREMENT FILE SUM~zARY FILE HEADER FILE~ER 12 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 2 0.5000 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 3420.0 3104.0 PEX 3420.0 3104.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): TOOL STRING (TOP TO BOTTOM) VEArDOR TOOL CODE TOOL TYPE BHC SDT PEX AIT $ BOREHOLE SONIC CARTR. ARRAY SONIC SONDE PLATFORM EXPRESS ARRAY INDUCTION TOOL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.0 3000.0 6960.0 1800.0 BOREHOLE CONDITIONS MUD TYPE: TOOL NUMBER ........... DSLC-B 817B SLS-W 1408 HTBCC 794 AIT-H 121 8.500 3104.0 3104.0 WATER BASED MUD LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 35 MUD DENSITY (LB/G): 10.50 MUD VISCOSITY (S) : 61.0 MUD PH: 9.4 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): 212.0 RESISTIVITY (Ot~4~l) AT TEMPERATURE (DEGF) : MUD AT ~4F~a~g~ TEMPERATURE (MT): 1.890 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): 1. 690 MUD FILTRATE AT (BHT): MUD CAKE AT (MT): 2. 290 MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERM3LL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: ************ RUN 1 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THE RAW (OPEN HOLE) REPEAT PASS DATA ACQUITED AT 0.5' SAMPLE RATE. $ LIS FORMAT DATA 65.0 65.0 65.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 72 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 14 12 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 3 6 TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 SP AIT MV 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 GR AIT GAPI 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 TENS AIT LB 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 HTENAIT LB 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 MRES AIT OPff4M1022691 O0 000 O0 0 12 1 1 4 68 0000000000 MTEMAIT DEGF 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 GDEVAIT DEG 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 CNTC PEX CPS 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 CFTC PEX CPS 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 RCFT PEX CPS 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 RCNT PEX CPS 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 TNRA PEX 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 RTNR PEX 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 TNPH PEX PU 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 NPHI PEX PU 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 NPOR PEX PU 1022691 O0 000 O0 0 12 1 1 4 68 0000000000 DT BHC US/F102269i O0 000 O0 0 12 1 1 4 68 0000000000 ** DATA ** DEPT. 6984. 000 SP.AIT HTEN. AIT 622. 251 F~tES. AIT CNTC. PEX 1605. 616 CFTC . PEX TNRA . PEX 2. 233 RTNR . PEX NPOR. PEX 21.767 DT. BHC 10.375 GR.AIT 0.853 MTEM. AIT 734.794 RCFT. PEX 2.407 TNPH. PEX 109.609 DEPT. 3104.000 SP. AIT 12. 813 GR. AIT HTEN. AIT 1047. 560 MRES.AIT 1. 352 MTEM.AIT CNTC. PEX 2024. 896 CFTC. PEX 603 . 870 RCFT. PEX TNRA.PEX 3. 494 RTNR.PEX 3. 611 TNPH. PEX NPOR . PEX 39.190 DT. BHC 135.938 149.126 TENS.AIT 2403.000 129.998 GDEV. AIT -999.250 638.266 RCNT. PEX 1508.393 22.351 NPHI.PEX 26.809 71.002 TENS.AIT 2121.000 93.908 GDEV. AIT 22.304 539.786 RCNT. PEX 1917.423 40.408 NPHI.PEX 48.533 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 37 **** FILE TRAILER **** FILE NAME : EDIT .012 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .013 SERVICE · FLIC VERSION ' O01CO1 DATE . 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NIIMBER 13 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 2 TOOL STRING NUMBER: 2 PASS NUMBER: 2 DEPTH INC~: 0.5000 FILE SUMi~ARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10086.0 9700.0 PEX LOG HEADER DATA DATE LOGGED: 24-SEP-97 SOFTWARE VERSION: 8C0- 609 TI~E CIRCULATION ENDED: 800 24-SEP-97 TIME LOGGER ON BOTTOM: 730 24-SEP-97 TD DRILLER (FT) : TD LOGGER (FT) : 10187.0 TOP LOG INTERVAL (FT) : 9700.0 BOTTOM LOG INTERVAL (FT) : 10140.0 LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PEX AUX. M~ASUREMENT SDT SONIC CARTRIDGE PEX PLATFORM EXPRESS PEX PLATFORM EXPRESS TOOL NUMBER AAMS-A 850 SDC-CB 17 HILTB -DTB HTBCC 794 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 38 AIT $ ARRAY INDUCTION TOOL AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 6.000 9700.0 9700.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): QUICK DRILN FLUID 8.80 54.0 9.1 225.0 O. 102 65.0 0.106 65.0 0.107 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 1.0 REMARKS.' ************ RUN 2 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH THIS IS THE TD LOGGING RUN FOR THIS WELL. FOUR STANDOFFS RUN ON THE SONIC HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG ACQUIRED AT A O. 5 ' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 39 TYPE REPR CODE VALUE 3 73 36 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 28 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 13 1 1 4 68 0000000000 SP AIT MV 1022691 O0 000 O0 0 13 1 1 4 68 0000000000 GR AIT GAPI 1022691 O0 000 O0 0 13 1 1 4 68 0000000000 TENS AIT LB 1022691 O0 000 O0 0 13 1 1 4 68 0000000000 ~RES AIT 0H~41022691 O0 000 O0 0 13 1 1 4 68 0000000000 CNTC PEX CPS 1022691 O0 000 O0 0 13 1 1 4 68 0000000000 CFTC PEX CPS 1022691 O0 000 O0 0 13 1 1 4 68 0000000000 NPHI PEX PU 1022691 O0 000 O0 0 13 1 1 4 68 0000000000 DT BHC US/F 1022691 O0 000 O0 0 13 1 1 4 68 0000000000 ** DATA ** DEPT. MRES.AIT DT. BHC 10086.000 SP.AIT 39.688 GR.AIT 84.088 TENS.AIT 4183.000 0.021 CNTC.PEX 4382.022 CFTC. PEX 2816.111 NPHI.PEX 14.972 80.500 DEPT. FLgES.AIT DT. BHC 9734.500 SP.AIT -18.063 GR.AIT 136.979 TENS.AIT 5444.000 0.020 CNTC. PEX 2682.968 CFTC. PEX 1229.622 NPHI.PEX 24.430 88.600 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 4O **** FILE TRAILER **** FILE NA~E : EDIT .013 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .014 SERVICE : FLIC VERSION · O01CO1 DATE . 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 14 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUM~ER: 1 TOOL STRING NUMBER: 1 PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE S~Y VENDOR TOOL CODE START DEPTH AIT 3420.0 PEX 3420.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 3104.0 3104.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. SDT ARRAY SONIC SONDE PEX PLATFORM EXPRESS 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.0 3000.0 6960.0 1800.0 TOOL NUMBER DSLC-B 817B SLS-W 1408 HTBCC 794 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 41 AIT ARRAY INDUCTION TOOL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERA7%IRE (DEGF) : RESISTIVITY (OHNk4) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : AIT-H 121 8.500 3104.0 3104.0 WATER BASED MUD 10.50 61.0 9.4 212.0 1. 890 65.0 1.690 65.0 2. 290 65.0 NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH BOWSPRING RUN ON NEUTRON FOR ECCE1TTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - L~ED OUT FROM BRIDGE. THIS IS THE RAW (OPEN HOLE) REPEAT PASS DATA ACQUITED AT 0.25' SAMPLE RATE. ¢ LIS FORMAT DATA TOOL STANDOFF (IN): 1.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 42 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 4 66 1 5 66 6 73 7 65 8 68 0.25 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN * * NA~E SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX) DEPT FT 1022691 O0 000 O0 0 14 1 1 4 68 0000000000 AFiO AIT 0HI~1022691 O0 000 O0 0 14 1 1 4 68 0000000000 AF20 AIT 0H~1022691 O0 000 O0 0 14 1 1 4 68 0000000000 AF30 AIT 0P~1022691 O0 000 O0 0 14 1 1 4 68 0000000000 ** DATA ** DEPT. 6984.000 AFIO.AIT 4.037 AF20.AIT 7.794 AF30.AIT DEPT. 3104.000 AFiO.AIT 5.808 AF20.AIT 16.283 AF30.AIT 8. 642 13.945 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 43 **** FILE TRAILER **** FILE NAFiE : EDIT .014 SERVICE : FLIC VERSION : O01CO1 DATE . 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NA~E : EDIT .015 SERVICE · FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE H~ER FILE~ER 15 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 2 TOOL STRING NUMBER: 2 PASS NUMBER: 2 DEPTH INCREMENT: 0.25000 FILE SUFmblRY VENDOR TOOL CODE START DEPTH STOP DEPTH 10086.0 9700.0 PEX LOG HEADER DATA DATE LOGGED: 24-SEP-97 SOFTWARE VERSION: 8C0 - 609 TIME CIRCULATION ENDED: 800 24-SEP-97 TIME LOGGER ON BOTTOM: 730 24-SEP-97 TD DRILLER (FT) : TD LOGGER (FT) : 10187.0 TOP LOG INTERVAL (FT) : 9700.0 BOTTOM LOG INTERVAL (FT) : 10140.0 LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PEX AUX. ~EASUREFfl~NT AAMS-A 850 SDT SONIC CARTRIDGE SDC-CB 17 PEX PLATFORM EXPRESS HILTB-DTB PEX PLATFORM EXPRESS HTBCC 794 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 44 AIT $ ~Y INDUCTION TOOL AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 6.000 9700.0 9700.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OIL~4) AT TEMPERATURE (DEGF) : MUD AT RiEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : QUICK DRILN FLUID 8.80 54.0 9.1 225.0 O. 102 65.0 O. 106 65.0 0.107 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : THERMAL MATRIX '. SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 1.0 REMARKS: ************ RUN 2 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH THIS IS THE TD LOGGING RUN FOR THIS WELL. FOUR STANDOFFS RUN ON THE SONIC HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG ACQUIRED AT A 0.25' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 908 '6 · r. IV'Of~V£8r'~ 6£0 '6 £IV'06~ 090 'Or J~IV'O9~qf £IV'OU~rV ££~ '6 £IV'Or~V 0S£ '~£L6 80S' 5 J. IV' 06~-V SUg' £ £IV' 09SV £90 '~ £IV'OrSV 000 '9800r 0000000000 89 ~ r r g~ 0 O0 000 O0 r69UEOrf4~FIO £IV 06=~V 0000000000 89 ~ r r £r 0 O0 000 O0 r69&~OrA~O ~IV 09~¥ 0000000000 89 ~ r r g~ 0 oo 000 oo r69~OrAU4HO ~IV Of~qf 0000000000 89 ~ r r gr 0 oo 000 oo r69u~or ~0 £IV o~Hv 0000000000 89 ~ r r g~ 0 oo 000 oo r69u~orf4[4Ho £IV or~qf 0000000000 89 ~ r r Sr 0 O0 000 O0 r69~0~ ~ ~0 (X~H) HGOD ~q~ dI4VS ~ COW SSWID ~dZ.~ OO~ # HH~HO ~I SSHDOHd Hd~H ~ZIS HI4DN HWi1N ~I~ IdV IHV IdV IdV HDIA~F~S £IN_Q AHHS HASfN ~ NVHD - ~JI~L £HE ~ r 99 0 r 99 9~ 89 99 0 99 89 ~ 99 ~ 59 6 5U'O 89 8 59 gL 9 99 r 99 fl: Ir £66r-.r. DO-gr ~ur.$sr.~I uo.r3~mr, gr.J~A ~de£ SI~ LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 46 **** FILE HEADER **** FILE NAi~E : EDIT . O16 SERVICE - FLIC VERSION - O01CO1 DATE · 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : RUN NUMBER: TOOL STRING NUMBER: PASS NUBIBER : DEPTH INCREMENT: FILE SUI~4ARY FILE HEADER FILE NUM~ER 16 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 2 0.1667 VENDOR TOOL CODE START DEPTH STOP DEPTH AIT 3420.0 3104.0 PEX 3420.0 3104.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TII4E CIRCULATION ENDED: TII4E LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC SDT PEX AIT $ BOREHOLE SONIC CARTR. ARRAY SONIC SONDE PLATFORM EXPRESS ARRAY INDUCTION TOOL BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.0 3000.0 6960.0 1800.0 TOOL NUMBER ........... DSLC-B 817B SLS-W 1408 HTBCC 794 AIT-H 121 8.500 3104.0 3104.0 WATER BASED MUD LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 47 MUD DENSITY (LB/G): 10.50 MUD VISCOSITY (S) : 61.0 MUD PH: 9.4 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : 212.0 RESISTIVITY (OH~M) AT TEMPERATURE (DEGF): MUD AT MEASURED TEMPERATURE (MT): 1. 890 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): 1. 690 MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): 2. 290 14UD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 REMARKS: ************ RUN 1 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THE RAW (OPEN HOLE) REPEAT PASS DATA ACQUITED AT 0 . 1667 ' SAMPLE RATE. $ LIS FORMAT DATA 65.0 65.0 65.0 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 80 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 12 12 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 48 TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NANiE SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 RHOZ PEX G/C3 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 FiDRA PEX G/C3 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 PEFZ PEX 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 DPHZ PEX PU 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 HMIN PEX OFiff~41022691 O0 000 O0 0 16 1 1 4 68 0000000000 HMNO PEX OH~ff41022691 O0 000 O0 0 16 1 1 4 68 0000000000 RXOZ PEX 0tfl~41022691 O0 000 O0 0 16 1 1 4 68 0000000000 RX08 PEX OH~4M1022691 O0 000 O0 0 16 1 1 4 68 0000000000 HCNT PEX CPS 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 HCFT PEX CPS 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 HGR PEX GAPI 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 RHFT PEX CPS 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 RHNTPEX CPS 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 HTNP PEX PU 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 PiNPOPEX PU 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 TT1 BHC US 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 TT2 BHC US 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 TT3 BHC US 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 TT4 BHC US 1022691 O0 000 O0 0 16 1 1 4 68 0000000000 ** DATA ** DEPT. 6984.000 RHOZ.PEX -999.250 PiDRA.PEX -999.250 PEFZ.PEX DPHZ.PEX 60721.211 H~IN. PEX 1.863 HMNO.PEX 1.629 RXOZ.PEX RXO8.PEX 1.956 HCNT.PEX 1605.615 HCFT. PEX 734.794 HGR.PEX RHFT. PEX 638.266 RtINT.PEX 1508.393 HTNP.PEX 22.351 HNPO. PEX TT1.BHC 700.234 TT2.BHC 483.906 TT3.BHC 689.922 TT4.BHC DEPT. 3104.000 RHOZ.PEX 2.237 IIDRA.PEX 0.101 PEFZ. PEX DPHZ.PEX 25.013 H~IIN. PEX 0.720 tflvlNO.PEX 0.354 RXOZ.PEX RXO8.PEX 0.342 HCNT. PEX 2018.829 HCFT. PEX 600.059 HGR.PEX RHFT. PEX 516.021 RHNT. PEX 1904.683 HTNP.PEX 40.587 HNPO. PEX TT1.BHC 833.750 TT2.BHC 551.953 TT3.BHC 832.969 TT4.BHC -999.250 1.994 149.126 21.767 467.813 6.492 0.495 70.346 39.531 554.531 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 49 **** FILE TRAILER **** FILE NA~E : EDIT .016 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .017 SERVICE : FLIC VERSION - O01CO1 DATE · 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER 17 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: 2 TOOL STRING NUMBER: 2 PASS NUMBER: 2 DEPTH INC~: 0.1667 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10086.0 9700.0 PEX LOG HEADER DATA DATE LOGGED: 24 -SEP-97 SOFTWARE VERSION: 8C0- 609 TIME CIRCULATION ENDED: 800 24-SEP-97 TIME LOGGER ON BOTTOM: 730 24-SEP-97 TD DRILLER (FT) : TD LOGGER (FT) : 10187.0 TOP LOG INTERVAL (FT): 9700.0 BOTTOM LOG INTERVAL (FT) : 10140.0 LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER PEX AUX. FiEAS~ AAMS-A 850 SDT SONIC CARTRIDGE SDC-CB 17 PEX PLATFORM EXPRESS HILTB-DTB PEX PLATFORM EXPRESS HTBCC 794 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 5O AIT $ ARRAY INDUCTION TOOL AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : 6.000 9700.0 9700.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHN~I) AT TEMPERATURE (DEGF) : MUD AT M~ASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): QUICK DRILN FLUID 8.80 54.0 9.1 225.0 O. 102 65.0 O. 106 65.0 O. 107 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 ~S: ************ RUN 2 NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH THIS IS THE TD LOGGING RUN FOR THIS WELL. FOUR STANDOFFS RUN ON THE SONIC HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG ACQUIRED AT A O. 1667 ' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 51 TYPE REPR CODE VALUE 3 73 4 66 5 66 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 32 1 0.166 FT 32 0 FT 68 1 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 17 1 1 4 68 0000000000 RHOZ PEX G/C3 1022691 O0 000 O0 0 17 1 1 4 68 0000000000 HDRA PEX G/C3 1022691 O0 000 O0 0 17 1 1 4 68 0000000000 PEFZ PEX 1022691 O0 000 O0 0 17 1 1 4 68 0000000000 HNPO PEX US 1022691 O0 000 O0 0 17 1 1 4 68 0000000000 TT1 BHC US 1022691 O0 000 O0 0 17 1 1 4 68 0000000000 TT2 BHC US 1022691 O0 000 O0 0 17 1 1 4 68 0000000000 TT3 BHC US 1022691 O0 000 O0 0 17 1 1 4 68 0000000000 ** DATA ** DEPT. 10086.000 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX -999.250 PflVPO. PEX 491.600 TT1.BHC 334.000 TT2.BHC 486.000 TT3.BHC 321.600 DEPT. 9734.834 RHOZ.PEX 2.592 HDRA.PEX -0.006 PEFZ.PEX HNPO. PEX 552.800 TT1.BHC 376.800 TT2.BHC 555.200 TT3.BHC 4.089 370.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 52 **** FILE TRAILER **** FILE NAFiE : EDIT .017 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .018 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NU~BER 18 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN ~ER : 1 TOOL STRING NUMBER: 1 PASS ~ER : 2 DEPTH INCREMENT: 0. 0833 FILE SUpKVlARY VENDOR TOOL CODE START DEPTH AIT 3420.0 PEX 3420.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 3104.0 3104.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. SDT ARRAY SONIC SONDE PEX PLATFORM EXPRESS 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7O00.O 3000.0 6960.0 1800.0 TOOL NUF~ER DSLC-B 817B SLS-W 1408 HTBCC 794 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE 53 AIT $ ARRAY INDUCTION TOOL BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (F~: LOGGERS CASING DEPTH (F~: BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : AIT-H 121 8.500 3104.0 3104.0 WATER BASED MUD 10.50 61.0 9.4 212.0 1. 890 65.0 1. 690 65.0 2.290 65.0 REMARKS: ************ RUN1 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDERRUNON THE AITH ONE STANDOF RUN ONTHE AITH BOWSPRING RUN ONNEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THE RAW (OPEN HOLE) REPEAT PASS DATA ACQUITED AT O. 0833 ' SAMPLE RATE. $ LIS FORMAT DATA TOOL STANDOFF (IN): 1.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 54 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EH ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.083 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 18 1 1 4 68 0000000000 HCAL PEX IN 1022691 O0 000 O0 0 18 1 1 4 68 0000000000 ** DATA ** DEPTo 6984.000 HCAL.PEX 3.867 DEPT. 3104.000 HCAL.PEX 3.819 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .018 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 55 **** FILE HEADER **** FILE NAME : EDIT .019 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE ~ FILE HEADER FILE NUMBER 19 RAW OPEN HOLEREPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NTJM~ER : 2 TOOL STRING NUMBER: 2 PASS NUMBER: 2 DEPTH INCREMENT: O. 0883 FILE S~Y VENDOR TOOL CODE START DEPTH PEX 10086.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH .......... 9700.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PEX AUX. MEASUREMFa%FT SDT SONIC CARTRIDGE PEX PLATFORM EXPRESS PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS MUD TYPE: 24-SEP-97 8C0-609 800 24-SEP-97 730 24-SEP-97 10187.0 9700.0 10140.0 TOOL NUMBER AAMS-A 850 SDC-CB 17 HILTB-DTB HTBCC 794 AIT-H 121 6.000 9700.0 9700.0 QUICK DRILN FLUID LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 56 MUD DENSITY (LB/G): 8.80 MUD VISCOSITY (S) : 54.0 MUD PH: 9.1 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): 225.0 RESISTIVITY (0I~4~) AT TEMPERATURE (DEGF) : MUD AT ~=AS~ TE~IPERATURE (MT): 0.102 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): 0.106 MUD FILTRATE AT (BHT) '. MUD CAKE AT (MT): 0.107 MUD CAKE AT (BHT): 65.0 65.0 65. 0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 TOOL STANDOFF (IN): 1.0 NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH THIS IS THE TD LOGGING RUN FOR THIS WELL. FOUR STANDOFFS RUN ON THE SONIC HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG ACQUIRED AT A O. 0883' SAMPLE RATE. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 O. 083 9 65 FT 11 66 128 12 68 13 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 57 TYPE REPR CODE VALUE 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 19 1 1 4 68 0000000000 HCAL PEX IN 1022691 O0 000 O0 0 19 1 1 4 68 0000000000 ** DATA ** DEPT. 10086.000 HCAL.PEX 4.172 DEPT. 9734.584 HCAL.PEX 6.343 ** END OF DATA ** * * * * FILE TRAILER * * * * FILE NAME : EDIT .019 SERVICE : FLIC VERSION · O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE '. LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .020 SERVICE '. FLIC VERSION · O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 20 RAW CASED HOLE MAIN PASS LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 58 Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH PEX 3104.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : STOP DEPTH 2923.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. SDT ARRAY SONIC SONDE PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT) : MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MA TRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.0 3000.0 6960.0 1800.0 TOOL NUMBER ........... DSLC-B 817B SLS-W 1408 HTBCC 794 AIT-H 121 8.500 3104.0 3104.0 WATER BASED MUD 10.50 61.0 9.4 212.0 1. 890 65.0 1. 690 65.0 2. 290 65.0 THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE 59 TOOL STANDOFF (IN): NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THE RAW PEX DATA ACQUIRED AT 0.5' SAMPLE RATE LOGGED UP INTO CASING. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NOWi~ SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 T~NS AIT LB 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 HTENAIT LB 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 GR AIT GAPI 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 CNTC PEX CPS 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 CFTC PEX CPS 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 60 NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NIIM~ SAMP ELEM CODE (HEX) RCFT PEX CPS 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 RCNT PEX CPS 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 TNRA PEX 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 RTNR PEX 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 NPOR PEX PU 1022691 O0 000 O0 0 20 I 1 4 68 0000000000 NPHI PEX PU 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 TNPH PEX PU 1022691 O0 000 O0 0 20 1 1 4 68 0000000000 ** DATA ** DEPT. 3104.000 TENS.AIT 2121.000 HTEN. AIT 1047.560 GR.AIT 71.002 CNTC.PEX 2024.896 CFTC. PEX 603.870 RCFT. PEX 539.786 RCNT. PEX 1917.423 TNRA.PEX 3.494 RTNR.PEX 3.611 NPOR.PEX 39.190 NPHI.PEX 48.533 TNPH. PEX 40.408 DEPT. 2945.000 TENS.AIT 2127.000 HTEN. AIT 1036.851 GR.AIT 46.927 CNTC. PEX 1340.739 CFTC. PEX 376.399 RCFT. PEX 350.570 RCNT. PEX 1280.803 TNRA.PEX 3.683 RTNR.PEX 4.353 NPOR.PEX 40.790 NPHI.PEX 51.967 TNPH. PEX 43.762 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .020 SERVICE · FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .021 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUI~BER 21 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 61 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SURk~ARY VENDOR TOOL CODE START DEPTH PEX 9700.0 $ LOG HEADER DATA STOP DEPTH 9578.0 DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PEX AUX. MEASUREMENT SDT SONIC CARTRIDGE PEX PLATFORM EXPRESS PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) '. DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (Otff~4) AT TEMPERATURE (DEGF) : MUD AT I~EASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: 24-SEP-97 8C0-609 800 24-SEP-97 730 24-SEP-97 0.0 10187.0 9700.0 10140.0 1800.0 TOOL NUMBER ........... AAMS-A 850 SDC-CB 17 HILTB-DTB HTBCC 794 AIT-H 121 6. 000 9700.0 9700.0 QUICK DRILN FLUID 8.80 54.0 9.1 225.0 O. 102 65.0 O. 106 65.0 0.107 65.0 THERMAL SANDSTONE LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 62 MATRIX DENSITY: HOLE CORRECTION (IN): 2.65 TOOL STANDOFF (IN): 1.0 RE~IARI~S: ************ RUN 2 NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH THIS IS THE TD LOGGING RUN FOR THIS WELL. FOUR STANDOFFS RUN ON THE SONIC HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG DATA SAMPLED AT 0.5' RATE LOGGED UP INTO CASING. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE ~ ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NOWi~ SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 21 1 i 4 68 0000000000 TENS AIT LB 1022691 O0 000 O0 0 21 1 1 4 68 0000000000 GR AIT GAPI 1022691 O0 000 O0 0 21 1 1 4 68 0000000000 CNTC PEX CPS 1022691 O0 000 O0 0 21 1 1 4 68 0000000000 CFTC PEX CPS 1022691 O0 000 O0 0 21 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 63 NAME SERVUNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) NPHI P~ PU 1022691 O0 000 O0 0 21 1 1 4 68 0000000000 * * DA TA * * DEPT. 9700. 000 TENS.AIT 5290. 000 CFTC.PEX 1036.842 NPHI. PEX 23.349 DEPT. 9575. 500 TENS.AIT 5392. 000 CFTC. PEX 372.942 NPHI. PEX 39.962 GR.AIT 49. 396 CNTC. PEX 2210. 464 GR. AIT 93.166 CNTC. PEX 1280.559 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .021 SERVICE : FLIC VERSION · O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .022 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 22 RAW CASED HOLE MAIN PASS Curves and log header data for open hole logs run into casing. PASS NUFIBER: 1 DEPTH INC~: 0.1667 FILE SUMMARY VEJVDOR TOOL CODE START DEPTH STOP DEPTH PEX 3104.0 2923.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 64 LOG HEADER DATA DATE L~ED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : TOOL STRING (TOP TO BOTTOM) VEJFDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. SDT ARRAY SONIC SONDE PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) MUD AT M~%S~ TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.O 3000.0 6960.0 1800.0 TOOL NUMBER DSLC-B 817B SLS-W 1408 HTBCC 794 AIT-H 121 8.500 3104.0 3104.0 WATER BASED MUD 10.50 61.0 9.4 212.0 1. 890 65.0 1. 690 65.0 2. 290 65.0 THERMAL SANDSTONE 2.65 ************ RUN 1 ************* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ONTHE AITH BOWSPRING RUN ONNEUTRON FOR ECCENTRALIZATION LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 65 FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THE RAW PEX DATA ACQUIRED AT 0.1667' SAMPLE RATE LOGGED UP INTO CASING. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN** NAME SERV UNIT SERVICE API API API API FILE NUMB ~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 22 1 1 4 68 0000000000 HCNT PEX CPS 1022691 O0 000 O0 0 22 1 1 4 68 0000000000 HCFT PEX CPS 1022691 O0 000 O0 0 22 1 1 4 68 0000000000 HGR PEX GAPI 1022691 O0 000 O0 0 22 1 1 4 68 0000000000 RHFT PEX CPS 1022691 O0 000 O0 0 22 1 1 4 68 0000000000 RI{NT PEX CPS 1022691 O0 000 O0 0 22 1 1 4 68 0000000000 HTNP PEX PU 1022691 O0 000 O0 0 22 1 1 4 68 0000000000 HNPO PEX PU 1022691 O0 000 O0 0 22 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 66 DEPT. 3104.000 HCNT. PEX RHFT. PEX 516.021 RHNT.PEX DEPT. 2945.333 HCNT.PEX RHFT. PEX 305.852 RtINT.PEX 2018.829 HCFT.PEX 1904.683 HTNP. PEX 1336.217 HCFT. PEX 1382.576 HTNP.PEX 600.059 HGR.PEX 40.587 HNPO. PEX 363.253 HGR.PEX 45.650 HNPO. PEX 70.346 39.531 44.521 49.010 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .022 SERVICE : FLIC VERSION . O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .023 SERVICE : FLIC VERSION . O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~ER 23 RAW CASED HOLEREPEAT PASSES Curves and log header data for each pass in separate files. PASS--ER: 2 DEPTH INCREMENT: 0.5000 FILE SUN~4~Y VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 3104.0 2923.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TDDRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7OOO.O 3000.0 6960.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 67 LOGGING SPEED (FPHR): 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. SDT ARRAY SONIC SONDE PEX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ TOOL NUMBER DSLC-B 817B SLS-W 1408 HTBCC 794 AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 8.500 3104.0 3104.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) : RESISTIVITY (OH~I) AT TEMPERATURE (DEGF) : MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT) : MUD CAKE AT (MT): MUD CAKE AT (BHT): WATER BASED MUD 10.50 61.0 9.4 212.0 1. 890 65.0 1.690 65.0 2. 290 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 1.0 P~M~D~S: ************ RUN 1 *****sc******* NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THE RAW PEX DATA ACQUIRED AT 0.5000' SAMPLE RATE LOGGED UP INTO CASING. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT~1997 11:33 PAGE: 68 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 52 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 19 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA2~E SERV UNIT SERVICE API API API API FILE NUA~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 TENS AIT LB 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 HTENAIT LB 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 GR AIT GAPI 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 CNTC PEX CPS 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 CFTC PEX CPS 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 RCFT PEX CPS 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 RCNT PEX CPS 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 TNRA PEX 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 RTNR PEX 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 NPOR PEX PU 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 NPHI PEX PU 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 TNPH PEX PU 1022691 O0 000 O0 0 23 1 1 4 68 0000000000 ** DATA ** DEPT. 3104.000 TENS.AIT 2121.000 HTEN. AIT 1047.560 GR.AIT CNTC. PEX 2024.896 CFTC.PEX 603.870 RCFT. PEX 539.786 RCNT. PEX TNRA.PEX 3.494 RTNR.PEX 3.611 NPOR.PEX 39.190 NPHI.PEX TNPH. PEX 40.408 71.002 1917.423 48.533 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 69 DEPT. 2945.000 TENS.AIT CNTC.PEX 1340.739 CFTC. PEX TN~A.PEX 3.683 RTNR.PEX TNPH. PEX 43.762 2127.000 HTEN. AIT 376.399 RCFT. PEX 4.353 NPOR.PEX 1036.851 GR.AIT 350.570 RCNT. PEX 40.790 NPHI.PEX 46.927 1280.803 51.967 ** END OF DATA ** **** FILE TRAILER **** FILE NAM~ : EDIT .023 SERVICE · FLIC VERSION · O01CO1 DATE · 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .024 SERVICE : FLIC VERSION : O01CO1 DATE . 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE1VUM~ER 24 RAW CASED HOLE REPEAT PASSES Curves and log header data for each pass in separate files. PASS NUM~ER: 2 DEPTH INCRE~IENT: 0.1667 FILE SUN~V~RY VENDOR TOOL CODE START DEPTH STOP DEPTH PEX 3104.0 2923.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TI~E CIRCULATION ENDED: TI~E LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): 20-SEP-97 8C0-609 800 20-SEP-97 2345 20-SEP-97 9713.0 7000.0 3000.0 6960.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 70 LOGGING SPEED (FPHR) : 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE BHC BOREHOLE SONIC CARTR. SDT ARRAY SONIC SONDE PBX PLATFORM EXPRESS AIT ARRAY INDUCTION TOOL $ TOOL NUMBER DSLC-B 817B SLS-W 1408 HTBCC 794 AIT-H 121 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) '. DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 8.500 3104.0 3104.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF) RESISTIVITY (OPAl4) AT TEMPERATURE (DEGF) MUD AT ~ASURED TEMPERATURE (MT) MUD AT BOTTOM HOLE TEMPERATURE (BHT) MUD FILTRATE AT (MT): MUD FILTRATE AT (BHT): MUD CAKE AT (MT): MUD CAKE AT (BHT) : WATER BASED MUD 10.50 61.0 9.4 212.0 1. 890 65.0 1. 690 65.0 2. 290 65.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): TOOL STANDOFF (IN): 1.0 RE~AR~S: ************ RUN 1 NABORS 18E THIS IS A PRIMARY DEPTH LOG HOLEFINDER RUN ON THE AITH ONE STANDOF RUN ON THE AITH BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION FOUR STANDOFFS RUN ON THE SONIC BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE. THIS IS THE RAW PEX DATA ACQUIRED AT 0.1667' SAMPLE RATE LOGGED UP INTO CASING. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 71 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 32 4 66 1 5 66 6 73 7 65 8 68 0.166 9 65 FT 11 66 32 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NOWB SAMP ELEM CODE (HEX) DEPT FT 1022691 O0 000 O0 0 24 1 1 4 68 0000000000 HCNTPEX CPS 1022691 O0 000 O0 0 24 1 1 4 68 0000000000 HCFT PEX CPS 1022691 O0 000 O0 0 24 1 1 4 68 0000000000 HGR PEX GAPI 1022691 O0 000 O0 0 24 i 1 4 68 0000000000 RHFT PEX CPS 1022691 O0 000 O0 0 24 1 1 4 68 0000000000 PJ4NTPEX CPS 1022691 O0 000 O0 0 24 1 1 4 68 0000000000 HTNP PEX PU 1022691 O0 000 O0 0 24 1 1 4 68 0000000000 HNPO PEX PU 1022691 O0 000 O0 0 24 1 1 4 68 0000000000 ** DATA ** DEPT. 3104.000 HCNT. PEX 2018.829 HCFT. PEX 600.059 HGR.PEX RHFT. PEX 516.021 RHNT.PEX 1904.683 HTNP.PEX 40.587 HNPO. PEX DEPT. 2945.333 HCNT. PEX 1336.217 HCFT. PEX 363.253 HGR.PEX RHFT. PEX 305.852 R3HCT. PEX 1382.576 HTNP.PEX 44.137 HNPO.PEX 70.346 39.531 44.521 41.846 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 15-0CT-1997 11:33 PAGE: 72 * * * * FILE TRAILER * * * * FILE NAME : EDIT .024 SERVICE : FLIC VERSION · O01CO1 DATE : 97/10/15 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/10/15 ORIGIN : FLIC TAPE NAi~E : 97440 CONTINUATION # : 1 PREVIOUS TAPE : COM~N=f · B.P. EXPLORATION, Z-03, PRUDHOE BAY, API #50-029-22787-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE . 97/10/15 ORIGIN · FLIC REEL NA~iE : 97440 CONTINUATION # : PREVIOUS REEL COM~iENT : B.P. EXPLORATION, Z-03, PRUDHOE BAY, API #50-029-22787-00