Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-131STATE OF ALASKA
ALASKA OICAND GAS CONSERVATION COMMIS ION
RECEIVED
n Dl~ n ~ ~nin
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: ^ Oil ^ Gas ^ SPLUG ^ Other ®Abandoned ^ Suspended
2oAAC 2s.~os zoAAC zs.»o
^ GINJ ^ WINJ ^ WAG ^ WDSPL ^ Other No. of Completions Zero 1b. W
®Developme loratory
^ Service Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband.:
3/17/2010 12. Permit to Drill Number:
197-131 310-009
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded:
09/08/1997 13. API Number:
50-029-22787-00-00
4a. location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached:
09/23/1997 14. Well Name and Number:
PBU Z-03
976
FNL, 1427
FWL, SEC. 19, T11 N, R12E, UM
Top of Productive Horizon:
3735' FNL, 3656' FWL, SEC. 19, T11 N, R12E, UM g. KB (tt above MSL): 83.75'
GL (ft above MSL): 54.05'
15. Field /Pool s
()~
Prudhoe Bay Field / Prudhoe Bay
Total Depth:
3750' FNL, 3674' FWL, SEC. 19, T11 N, R12E, UM 9. Plug Back Depth (MD+TVD):
9467' 8492' Oil Pool
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 599151 y_ 5959100 Zone- ASP4 10. Total Depth (MD+TVD):
10187' 9210' 16. Property Designation:
ADL 028262
TPI: x- 601415 y- 5956370 Zone- ASP4
Total Depth: x- 601434 y- 5956356 Zone- ASP4 11. SSSV Depth (MD+TVD):
N/A 17. Land Use Permit:
18. Directional Survey: ^ Yes ®No
Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore:
N/A ft MSL 20. Thickness of Permafrost (TVD):
1900' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
MWD, DIR, GR, RES / AIT, DT / BHC, CNL, LDL, GR, Caliper, SP, MRES, RFT, Numar, RST 22. Re-Drill/Lateral Top Window MD/TVD:
NA
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUN'L
CASING WT. PER FT. GRADE 'TOP BOTTOM TOP BOTTOM SIZE CEMENTING'RECORD PULLED.'
1. H-40 rfa rf - 0 sx A i e
" -/4" 4 14
7" 2 L- 7 3' 8724' 8-1/2" 44 x I ss'G'
4-112" 1 1 1 7' 1 82 I
24. Open to production or injection? ^ Yes ®No 25. TUBING RECORD
If Yes, IISt each Interval Open
(MD+TVD of Top & Bottom; Perforation Size and Number): SIZE DEPTH SET MD PACKER SET MD / TVD
4-1/2", 12.6#, 13Cr 9505' 9294' / 8320'
MD TVD MD TVD
26. ACID; FRACTURE; CEMENT SQUEEZE'ETC.
~ ., DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
- ~~ a't ~~{~« ~~~ ~ ~~ `~ saas~-sasa~ssszo~-sszs Punch Tubin for Pumping Cement
9482' Set ES Drill Squeeze Packer
9467' Pump 5.1 Bbls Cement
9467' Set Whipstock
27. PRODUCTION TEST
Date First Production:
Not on Production Method of Operation (Flowing, Gas Lift, etc.):
N/A
Date of Test: Hours Tested: Production For
Test Period OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
Press. Casing Press: Calculated
24-Hour Rate OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
28. CORE DATA Conventi onal Core(s) Acqui red? ^ Yes ® No Sidewall Core(s) Acquired? ^ Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
None
Form 10-407 Revised 12,(:1~IJIY~~7 ~ ONTINUED ON REVERSE Submit Original Only
Ir~~~,J~ APR 0 810 c~~1. yl - `(• z 1 • ~a ,,..Y/~/,~,
29. GEOLOGIC MARKERS (List all formations and ma encountered): 30. MATION TESTS
• NAME MD TVD Well Tested? ^ Yes ®No
Permafrost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permafrost Base detailed test information per 20 AAC 25.071.
Sag River 9684' 8708' None
Shublik 9708' 8732'
Shublik B 9763' 8787'
Shublik C 9785' 8809'
Sadlerochit 9842' 8866'
Zone 3 10121' 9144'
Formation at Total Depth (Name):
31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~ v7
~~o
Signed: Terrie Hubble Title: Drilling Technologist Date:
PBU Z-03 197-131 310-009 Prepared ByName/Number. Terrie Hubble, 564-4628
Well Number Permit No. /Approval No. Drilling Engineer: Sean McLaughlin, 564-4387
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
Item 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.071.
Form 10-407 Revised 12/2009 Submit Original Only
• •
Z-03, Well History (Pre Rig Sidetrack)
Date Summary
2/6/2010 WELL S/I ON ARRIVAL. TAG FISH @ 9476' SLM W/ 3.70" DUMMY WHIPSTOCK. SET 4 1/2" X-
CATCHER SUB @ 9248' SLM / 9273' MD. PULLED BK-OGLV FROM STA# 1 9185' SLM / 9201' MD,
PULLED BK-LGLV FROM STA# 5 @ 7195' SLM, 7217' MD.
2/7/2010 PULL BK-LGLV FROM STA# 3 @ 8420' SLM / 8440' MD, STA# 7 @ 5560' SLM / 5577' MD, STA# 9 @
3247' SLM / 3264' MD. SET BK DMY-GLV IN STA# 9 @ 3247' SLM / 3264' MD, STA# 7 @ 5560' SLM /
5577' MD, STA# 5 @ 7195' SLM / 7217' MD STA# 3 @ 8420' SLM /8440' MD, STA# 1 @ 9185' SLM
/9205' MD. PULLED 4 1/2" X- CATCHER SUB FROM 9248' SLM / 9273' MD (empty). MIT-IA TO 3000#,
PASS. WELL S/I ON DEPARTURE, PAD OP NOTIFIED.
2/11/2010 T/I/0=0/360/0 MIT x OA passed to 2000 psi (pre CT). Pumped 1 bbl DSL to pressure up OA to 2000 psi.
OA lost 100 psi in 15 minutes and 40 psi in the second 15 minutes for a total 30 minute loss of 140 psi.
Bled OAP (1.4 bbls fluid). FWP's=0/360/0+
3/1/2010 WELL SHUT IN UPON ARRIVAL. INITIAL T/I/O: 0/300/0 TUBING PUNCHED FROM 9488.5' - 9493.5'
WITH MEDIUM PUNCHERS. TUBING PUNCHED FROM 9320' - 9325' WITH MEDIUM PUNCHERS.
SET EZ DRILL SVB SQUEEZE PACKER. TOP OF SQUEEZE PACKER AT 9482' MID ELEMENT AT
9483'. FINAL :350 300 0
3/4/2010 T/IA/OA= SI/380/0 Temp=S1 PPPOT-T (PASS) (Pre CTD)
PPPOT-T : RU 2 HP BT onto THA 500 psi bled to 0 psi, flush void until clean returns achieved.
Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bleed void to 0 psi, RD
test equipment, re-installed Alemite caps. Cycle and torque LDS "ET style" all functioned with no
problems.
3/8/2010 MIRU CTU #8 w/ 1.75" coil. MU/RIH w/ BOT MHA/HAL 3.6" OD Star Guide stinger. Flag CT @ 9450'.
Tag retainer @ 9478'. Correct counter to +4'. Stack 7-8k# down. Establish circ down coil/up backside.
Circ bottoms up through coil, returns from IA, through tubing punches, and up backside. Pump 5.1 bbls
15.8#,r cement. Unsting from retainer lay 1 bbl of cement on top of retainer. Jet back down to 9470' twice
chase out of hole washing jewelry. At surface popoff well change to BHA #2 w/ 3.8" mill.
3/9/2010 MU/RIH w/ BOT BHA#2 w/ 3.8" mill. Stop at flag correct depth to 9463.3'. RIH milling to 9478' make
three passes. Go dry tag 9487.6' pump last gel pill chase out of hole. Inspect bad pipe @ 7253'. Drop
0.75" ball, open circ sub, continue chase out. Perform MIT of tubing to 1000 psi. Perform tubing MIT-
Passed/OK. Blow down reel. RDMO. Job in complete.
3/9/2010 WELL S/I ON ARRIVAL. CURRENTLY RIGGING UP SLICKLINE UNIT TO DRIFT FOR WHIPSTOCK.
3/10/2010 DRIFTED & TAGGED FISH WITH 20' x 3.70" DUMMY WHIPSTOCK @ 9498' SLM (NO PROBLEMS).
WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED.
3/11/2010 WELL SHUT-IN ON ARRIVAL. INITIAL T/I/O = 100/0/0 PSI. SET TOP BAKER 4-1/2" WHIPSTOCK AT
9467.0', BOTTOM OF WHIPSTOCK SET AT 9479.4'. 2 RA PIP TAGS IN WHIPSTOCK AT 9475.6'. WS
O I I 2 D G EES LEFT OF HIGH SIDE.~ONE METAL WHEEL 1" DIAMETER AND 1/8"
THICK FELL OFF TOOL AND LEFT IN HOLE. FINAL T/I/O = 100/0/0 PSI. WELL SHUT-IN ON
DEPARTURE, DSO NOTIFIED, JOB COMPLETE.
Page 1 of 1
BP EXPLORATION
Operations Summary Report
Legal Well Name: Z-03
Page 1 ski
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: REENTER+COMPLETE Start: 3/10/2010 End: 3/27/2010
Contractor Name: NORDIC CALISTA Rig Release: 3/27/2010
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
3/13/2010 23:00 - 00:00 1.00 RIGD P PRE MOVE RIG OFF OF MPF PAD.
3/14/2010 00:00 - 20:35 20.58 RIGD P PRE MOVE RIG FROM MPL PAD TO SPINE ROAD.
MOVE RIG FROM SPINE ROAD TO Z PAD ACCESS ROAD.
MOVE RIG DOWN Z PAD ACCESS ROAD & ONTO THE
BACKSIDE OF Z PAD.
20:35 - 20:37 0.03 RIGD P PRE ARRIVE ON THE BACKSIDE OF Z PAD.
20:37 - 00:00 3.38 RIGD P PRE LD HERCULITE LINER. RU OA HOSE FOR GAUGE
READINGS. RU T-MATS. DISCOVER THAT WE CAN"T
SPOT STRAIGHT ON WELL AS WE LOSE THE ABILITY TO
LOWER THE REEL TO THE GROUND DUE TO ELECTRICAL
BOXES & WALKWAY IN FRONT OF THE RIG. DISCUSS
WITH PAD OP & GET APPROVAL & REMOVE LARGE
SNOW BERM NEXT TO WALK WAY TO GAIN MORE PAD
ACCESS.
3/15/2010 00:00 - 01:00 1.00 RIGU P PRE CONTINUE TO CLEAN SNOW FOR MORE ACCESS IN
FRONT OF THE RIG RIG.
01:00 - 03:45 2.75 RIGU P PRE -37F AMBIENT, TAKE FREQUENT WARM UP BREAKS.
ATTEMPT TO MOVE RIG OVER WELL. ISSUES ARE:
CLOSE PROXIMITY TO ADJACENT WELL & RIG STAIR
CASE, SPOTTING AT A ANGLE & T-MAT PLACEMENT &
REQUIRED ACCESS FOR REEL SWAP. READJUST
T-MATS. SPOT OVER WELL. SPOT CUTTINGS BOX.
03:45 - 06:00 2.25 RIGU P PRE RD ADAPTOR FLANGE. RD CHOKE HOSE. PLACE 2X6'S
UNDER CELLAR BOX BEAM. SET RIG DOWN AGAIN.
06:00 - 12:00 6.00 RIGU P PRE ACCEPT RIG AT 06:00 AM.
SPOT SECONDARY EQUIPMENT.
INSTALL CHOKE HOSE.
STAB ROPE.
12:00 - 17:30 5.50 RIGU P PRE ND TREE CAP & NU BOPE.
RU THE MPD LOOP.
CLEAN PITS OF WELDING AND GLUING DEBRIS.
17:30 - 18:00 0.50 RIGU P PRE CREW CHANGE OUT & PERFORM WALK ABOUNDS.
18:00 - 20:00 2.00 RIGU P PRE C/O BOP RAMS FOR BIG TOOLS.
20:00 - 21:00 1.00 BOPSU P PRE FILL STACK WITH WATER.
21:00 - 00:00 3.00 BOPSU P PRE PERFORM BI-WEEKLY BOPE TEST PER AOGCC BEGS,
250/PSI/3500PSI.
LOU GRIMALDI WAIVED WITNESS TO TEST.
3/16/2010 00:00 - 02:30 2.50 BOPSU P PRE CONTINUE TO TEST BOPE PER AOGCC BEGS,
250PSI/3500PSI -PASS.
LOU GRIMALDI WAIVED WITNESS TO TEST.
02:30 - 02:45 0.25 BOPSU P PRE PJSM REGARDING RU & PULLING BPV.
02:45 - 04:15 1.50 BOPSU P PRE RU BPV LUBRICATOR. PRESSURE TEST 250PS1/500PSI.
PULL BPV. RD BPV LUBRICATOR. ISSUES WITH THE SSV
OVER STROKING OPEN, BLEED DOWN SSVP & CLOSE
SSV SLIGHTLY. -25PSI WHP.
04:15 - 08:00 3.75 BOPSU P PRE PRESSURE TEST MPD LOOP, 250PSI/3500PS1.
08:00 - 08:20 0.33 BOPSU P PRE BLOW DOWN BOPE.
08:20 - 08:40 0.33 BOPSU P PRE PJSM TO SLIP AND CUT DRILL LINE.
08:40 - 10:45 2.08 BOPSU P PRE SLIP AND CUT DRILL LINE.
10:45 - 11:00 0.25 BOPSU P PRE PJSM TO PU INJECTOR AND PUMP SLACK.
11:00 - 13:00 2.00 BOPSU P PRE CIRC COIL TO WATER.
PRESS TEST SWIVEL TO`4300 PSI, PRESS TEST PACK
OFF PER AOGCC BEGS 250PS1/3500PSI -PASS.
Printed: 3/29/2010 11:46:08 AM
•
BP EXPLORATION Page 2 >~
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: REENTER+COMPLETE Start: 3/10/2010 End: 3/27/2010
Contractor Name: NORDIC CALISTA Rig Release: 3/27/2010
Rig Name: NORDIC 2 Rig Number: N2
Date From - To Hours Task Code NPT Phase Description of Operations
3/16/2010 13:00 - 13:45 0.75 STWHIP P WEXIT PUMP SLACK. GOOD E-LINE MOVEMENT.
BLOW BACK END OF COIL WITH AIR.
13:45 - 14:00 0.25 STWHIP P WEXIT SAFETY MEETING. REVIEW PROCEDURE, HAZARDS AND
MITIGATION FOR CUTTING COIL.
14:00 - 14:45 0.75 STWHIP P WEXIT CUT OFF 300' OF COIL.
14:45 - 16:30 1.75 STWHIP P WEXIT M/U CTC AND PULL TEST WITH 30K.
M/U UOC AND TEST E-LINE.
16:30 - 18:30 2.00 STWHIP N SFAL WEXIT REPAIR GUN LINE IN RIG PITS.
18:30 - 19:45 1.25 STWHIP P WEXIT FILL COIL & PRESSURE TEST CTC TO 4000PSI -GOOD.
PLACE INJECTOR OVER BUNG HOLE & SWAP REEL TO
GEOVIS -PUMP FORWARD TO COMPLETE SLACK
MANAGEMENT. OPEN WELL -DEAD & FLOW CHECK FOR
15 MIN WHILE COMPLETING PJSM FOR PU BHA. PREP
FLOOR VALVE. SUCK DOWN MPD LOOP.
19:45 - 20:00 0.25 STWHIP P WEXIT PJSM REGARDING MU MILLING BHA.
20:00 - 20:50 0.83 STWHIP P WEXIT MU WINDOW MILLING BHA, MILLS ARE 3.80". PU 5'
LUBERICATOR FOR PRESSURE UNDEPLOYMENT. SET
BHA IN 3" SLIPS & STRIP OVER WELL, OPEN 3" SLIPS &
GET TAG UP MEASUREMENT FOR PRESSURE
UNDEPLOYMENT.
20:50 - 23:00 2.17 STWHIP P WEXIT RIH WITH WINDOW MILLING BHA.
23:00 - 23:50 0.83 STWHIP P WEXIT LOG DOWN FOR TIE-IN FROM 8932'. MINUS 45'
CORRECTION.
23:50 - 00:00 0.17 STWHIP P WEXIT RIH.
3/17/2010 00:00 - 00:10 0.17 STWHIP P WEXIT RIH & DRY TAG AT 9468'.
00:10 - 06:00 5.83 STWHIP P WEXIT MILL HS WINDOW FROM FIRST MW AT 9467. 7 WHILE
SWAPPING WELL TO NEW GEO-VIS. "'
Z,-03~ PUMP 1.956PM/2230PSI (REDUCE RATE DUE TO
POSSIBLE BACKLASH WITH MOTOR TORQUE & 1-1/2" MT
CONNECTION) W/ 50-150 PSI DIFF, 1-2.5K WOB W/ 9.69
ECD PVT 337. TIME MILL 0.1' EVERY 6 MIN. MIX 14 50LB
SACKS OF RESINEX INTO MUD SYSTEM. ESTABLISH
MILLING PATTERN. BLED DOWN IA FROM 250PS1 to 10PS1.
MILLED TO 9473'.
06:00 - 11:00 5.00 STWHIP P WEXIT MILL 3.80" HIGHSIDE WINDOW THRU 4-1/2" AND 7"
CASING. 1.9 BPM, 2600 FREE SPIN, 2700-2800 PSI, 2-3K
WOB, 1/2 FPH, 9.7 ECD, NO STALLS.
MILLED TO 9474'.
11:00 - 14:00 3.00 STWHIP P WEXIT MILL 3.80" HIGHSIDE WINDOW THRU 4-1/2" AND 7"
CASING. 1.9 BPM, 2700 FREE SPIN,
2800-3000 PSI, 3K WOB, 10 DEG INCL, 9.8 ECD, NO
STALLS.
MILLED TO 9475'.
14:00 - 17:00 3.00 STWHIP P WEXIT MILL. 1.9 BPM, 2700 FREE SPIN, 2900-3000 PSI, 3.5K
WOB, 10 DEG INCL, 9.8 ECD,
MILLED TO 9476'.
17:00 - 19:00 2.00 STWHIP P WEXIT MILL. 1.9 BPM, 2700 FREE SPIN, 2900-3000 PSI, 3.5K
WOB, 10 DEG INCL, 9.8 ECD,
MILLED TO 9476.4
19:00 - 00:00 5.00 STWHIP P WEXIT MILL. 1.84 BPM, 2830 FREE SPIN, 2900-3000 PSI, 3-3.9K
WOB, 10 DEG INCL, 9.83 ECD, APPEARS TO HAVE EXITED
THE 7" AT 9477.3'. HOLD 630PSI WHP - 11.18PPG ECD.
MILLED TO MIDNIGHT DEPTH OF 9477.6'
Printed: 3/29/2010 11:46:OS AM
TREE _ CMJ
WELLHPAD = FMC
ACTUATOR = BAKER C
KB. ELEV - 83.75'
BF. ELEV = 54.05'
KOP = 2573'
Max Angle = 88° @ 10149'
Datum MD = 10050'
Datum TV D = 8800' SS
C
SAFETY WELL ANGLE> 70° @ 10811' *** 4-
Z ~O 3A 1/2" CHRTUBING & 2.3/8" CHROM E LNR (DEPTHS
ARE ELM D) 3" GAP BETW OVERSHOT @ 9505° &
LTP @ 9508' ***
2101' 9-5/8" TY PE H ES CEMENTER
2240' 4-1/2" HES X NIP, ID = 3.813"
GAS LIFT MANDRELS
20" CONDUCTOR, 91.5#, H-40, ID = 19.124" 110'
9-5/8" CSG, 40#, L-80 BTC, ID = 8.835" 3104'
Minimum ID =1.920" @ 9315'
2-3/8" PUP JOINT
7" MARKERJOINT
ST MD TVD DEV TYPE VLV LATCH PORT DATE
9 3264 3225 28 KBG2-1R DOME BK 16 04/01/10
8 4213 4020 33 KBG2-1 R DMY BK 0 05/30/08
7 5577 5168 34 KBG2-1R SO BK 20 04/01/10
6 6396 5843 33 KBG2-1R DMY BK 0 05/30/08
5 7217 6531 33 KBG2-1R DMY BK 0 02/07/10
4 7830 7044 34 KBG2-1R DMY BK 0 05/30/08
3 8440 7558 32 KBG2-1R DMY BK 0 02/07/10
2 8886 7936 28 KBG2-1R DMY BK 0 05/30/08
1 9205 8223 13 KBG2-1R DMY BK 0 02/07/10
4-1/2" HES X NIP, ID = 3.813"
9294' ~-~ 7" X 4-1/2" BKR S-3 PKR, ID = 3.875"
9310' -{4-1/2" BOT KB LTP, ID = 2.370"
ESTIMATED TOP OF CEMENT -9320 9315' 2-7/8" SPACER PUP JOINT, ID = 1.920"
'.TUBING PUNCH (03/01/10) 9320' - 9325' 9318' 4-1/2" HES X NIP, ID = 3.813" (BEHIND CT LNR)
9342' 3-1/2" BTT DEPLOY SLV, ID = 3.00"
3-1/2" X 2-3/8" STL XO PIN, ID = 1.92"
~ TOP OF WHIPSTOCK ~
4-1/2" HES EZDRILL PKR (03/01/10)
4-1/2"TBG, 12.6#, 13CRVAMTOP,
.0152 bpf, ID = 3.958"
7" CSG, 26#, L-80 BUTT-M, .0383 bpf, ID = 6.276"
9479'
9482'
9495'
9700' r~
PERFORATION SUMMARY
REF LOG: SWS MGR/ CCL ON 03/25/10
ANGLE AT TOP PERF: 73° @ 9967'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
1.56" 6 9967 - 10227 O 03/26/10
1.56" 6 10225 - 10475 O 03/26/10
1.56" 6 10525 - 10570 O 03/26/10
1.56" 6 10592 - 10702 O 03/26/10
1.56" 6 10735 - 10780 O 03/26/10
1.56" 6 10800 - 10810 O 03/26/10
1.56" 6 10833 - 10853 O 03/26/10
3.80" MILLOUT WINDOW (Z-03A) 9467 ' - 9477'
PBTD ~~ 10859'
~ 2-3/8" LNR, 4.44#, 13CR-80 STL, .0039 bpf, ID = 1.992" ~
DATE REV BY COMMENTS DATE REV BY COMMENTS
09/28/97 JLM ORIGINAL COMPLETION 04/05/10 SMNV PJ FINAL DRLG CORRECTIONS
06/02/08 N3S RWO
03/27/10 NORDIC 2 CTD SIDTRACK (Z-03A)
03/27/10 PJC DRLG DRAFT CORRECTIONS
03/28/10 PJC PERF ANGLE CORRECTION
04/01/10 JLH/PJC GLV GO
PRUDHOE BAY UNff
WELL: Z-03A
PERMff No:2100100
API No: 50-029-22787-01
SEC 19, T11 N, R12E, 976' FNL & 1427' FWL
BP Exploration (Alaska)
• •
SEAN PARNELL, GOVERNOR
~T~r tailLa-7~A OII, talu~+s~+(irAs 333 W. 7th AVENUE, SUITE 100
COls-7CR~A~O" CO~-7-7IO~ ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907)276-7542
Mr. John McMullen
Production Engineer
BP Exploration (Alaska), Inc. -
P.O. Box 196612
Anchorage, Alaska 99519-6612 ~~,,
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU Z-03
Sundry Number: 310-009
Dear Mr. McMullen:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount
Chair
DATED this ~~ day of January, 2010
Encl.
STATE OF ALASKA
~~.sLY,DD// /N/°.e~ ALASK~L AND GAS CONSERVATION COMMI~N
.FO.e,G~~~i~ APPLICATION FOR SUNDRY APPROVAL
~,j,T> a1/QO/O 20 AAC 25.280
~.. 2 X11 ~
1. Type of Request:
® Abandon - - ®Plug for Redrill ^ Perforate New Pool ^ Repair Well ^ Change Approved Progl~rt~
^ Suspend ^ Plug Perforations ^ Perforate ^ Pull Tubing ^ Time Extension
^ Operations Shutdown ^ Re-Enter Suspended Well ^ Stimulate ^ Alter Casing ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. - ®Development ^ Exploratory 197-131
3. Address: ^ Service ^ Stratigraphic 6. API Number.
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22787-00-00 -
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU Z-03
Spacing Exception Required? ^ Yes ®No
9. Property Designation: 10. Field /Pool(s):
ADL 028262 ~ Prudhoe Bay Field / Prudhoe Bay Oil Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
10187 - 9210- 10101 9124 None 9502'
Casin Len Size MD TVD Burst Colla
Structural
Conductor g ' 20" 14 47
Surface 3072' 9-5! " 3104' 30 5750 0 0
Intermediate 9670' 7" 9700' 8724' 7240 10
Production
Liner 679' 4-1/2" 9 08' - 101 7' 8533' - 921 8430 7
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
9844' - 9982' 8868' -9005' 4-1/2", 12.6# 13Cr 9505'
Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV 9294' / 8320'
MD (ft) and TVD (ft):
12. Attachments: 13. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: February 15, 2010 ^ Oil ^ Gas ^ WDSPL ^ GSTOR ®Abandoned
16. Verbal Approval: Date: ^ WINJ ^ GINJ ^ WAG ^ Plugged ^ SPLUG
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean McLaughlin, 564-4387
Printed Name John Mc ul n Title Engineering Team Leader
~ Prepared By NameJNumber
y
Phone 564-4711 Date ~ /~/ Terrie Hubble, 564-4628
Signature ^~'~
' ~~`~ ` Commission Use-0nl
Conditions of proval: NoF Commission so that a representative may witness Sundry Number. ! O ~~~
^ Plug Integrity OP Test ^ Mechanigl Integrity Test ^ Location Clearance
,~ 3 Sao Pro ~eP st-
Other:
~ Z Soo Psd flyh wl.~ l~s t ~)
Subsequent Form Required: ~ U . ~/ Q
APPROVED BY ~~ O
D
f
d
ate
Approve
By: COMMISSIONER THE COMMISSION
Fo' 010~~0; ReJf~~12[~09 Submit In Duplicate
• •
To: Alaska Oil & Gas Conservation Commission
From: Sean McLaughlin ~.Jp
CTD Engineer
Date: January, 12 2010
Re: Z-03 Sundry Approval
Sundry approval is requested for well Z-03. A 2008 RWO to change out corroded tubing resulted in a
piece of tailpipe with a plug stuck in it, stuck in liner at 9600 MD. No communication with reservoir.
Also an obstruction in the Unique machine overshot at 9500 MD. This obstruction is thought to be a
partially milled piece of the liner tieback sleeve, milled somewhat lengthwise, laying across the
wellbore. No access below 9500' MD.
REASON FOR SIDETRACK
Sidetrack to regain access to the reservoir
The proposed plan for Z-03A is to drill a through tubing sidetrack with the Nordic 2 Coiled Tubing
Drilling rig on or around April 10, 2010. The existing perforations will be isolated by the fish, cement,
cement retainer, and the primary cement job. The sidetrack, Z-03A, will exit the 4.5" tubing tail and
target zone 4. The following describes work planned and is submitted as an attachment to Form 10-
403. Aschematic diagram of the proposed sidetrack is attached for reference.
CW~st wd~~~ %J I/~- f/Ss~~e,
.~ Concw
Pre-Rig Work: (scheduled to begin February 15, 2010) .
Pro os~ol f~o/it~Atr ~'// ~'j~ ~~s«v~J
~
1.
2. O
S MIT-IA, -OA
Run dummy whipstock drift to obstruction '~oF /oc~vN'oH,
~c G~ exifr~%-~ ~~'~
3. S Dummy. GLV's ~~
~ 1"~t//O
4. E Punch tubing C~ 9490' and 9320'. i
5. E Set cement retainer C«~ 9485'.
6.
7. C
C Cement up 4-1/2" x 7" annulas
Cleanout to top of the cement retainer with a 3.8"
mill a--~ ~ 7- i b:~1.
8. S Dummy WS drift
9. E Set Baker 4.5" monobore WS w, HS(+/-30 degs) orientation @ 9470'.
10. O Set BPV
11.0 Test: PPPOT-T. Torqued LDS.
12. O PT MV, SV, WV
13.0 Blind and bleed lines, remove well house, level pad
Rig Work: (scheduled to begin on April 10, 2010)
1. MIRU and test BOPE to 250 psi low and 3500 psi high.
2. Mill 3.8" window at 9470' and 10' of rathole.
3. Drill Intermediate: 4.125" OH, 232' (12 deg/100 planned)
4. Run 3-3/16" uncemented liner to cover up the Kingak
5. Drill Lateral: 3" OH, 1228' (18 deg/100 planned) with resistivity
6. Run 2-3/8" solid chrome liner leaving TOL at 9400'
7. Pump primary cement leaving TOC at 9400', 6 bbls of 15.8 ppg liner cmt planned
8. Cleanout liner and MGR/CCL log
9. Test liner lap to 2000 psi.
10. Perforate liner per asset instructions (500')
11. Set Liner Top Packer at 9395'
12. Freeze protect well, RDMO
~ 3~0~~~
Post Rig:
1. Re-install well house and attach production lines.
2. Pull BPV
3. Run GLV's
4. Test separator? (500' of perfs)
Sean McLaughlin
CTD Engineer
564-4387
CC: Well File
Sondra StewmanlTerrie Hubble
L D = FMC
CTt,1ATOR = BAKER C
K8. ELLa/ = 83.75'
BF. ELEV = 54.05'
KOP = 2573'
Max Angle = 35° ~ 5780'
Datwn MD= 9860'
Dat~un ND = 8800' SS
• Z-03
20" CONDUCTOR, 9t .511, H-40, ID = 19.124" 110'
9-5/8" CSG, 401F, L-80 BTC, ID = 8.835" 3104'
Minimum ID ~ 3.813" ~ 2240'
4-112" HES X NIPPLE
IT' MARKER JOINT I
SAFETY ~S: "` 4-1/2' CFif~ME TtBtNG "" 3- GAP
BETW HOT ~ 9505' S LTP ~ 9508""
2101' 9-5/8" TY PE H ES COVBNTER
2240' 4-1 /2" HES X NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD ND DEV TYPE VLV LATCH PORT [SATE
9 3264 3225 28 KBG2-1 R DDME BK 16 0627108
8 4213 4020 33 KBG2-1 R DMY BK 0 05!30!08
7 5577 5168 33 KBG2-1 R DOME BK 16 0627/08
6 6396 5843 33 K8G2-1 R DRAY BK 0 05!30!08
5 7217 6531 33 KBG2-1 R DDME BK 16 0627/06
4 7830 7044 34 KBG2-1 R DMY BK 0 05/30/08
3 8440 7558 32 KBG2-1 R DOME BK 16 0627106
2 8886 7936 28 KBG2-1 R DMY BK 0 05/30108
1 9205 8223 13 KBG2-1 R SO BK 24 0627108
8273' H 4-112" HES X NIP, ID = 3.813"
9294' {-~ T' X 4-12" BKR S-3 PKR, ID = 3.875"
4-1/2" HES X NIP, ID = 3.813"
4-1/2" TBG, 12.6#, 13CR VAM TOP,
.0152 bpf, ~ = 3.958°
ITOP OF 4-112" LNR I
8$02' -1 FISH -OBSTRUCTION (02!27/09)
8506' 7" X 4112" lJnlA OVERSHOT
9508' T' X 5" ZXP LTP w f HMC LNR HGR, ID = 4.375"
8525' ~-~ 5" X 4-1 /2° XO, ID =
7" CSG, 28i, L-80 BUTT-M, .0383 bpf, ID = 8.278"
PB7FORATION SUMMARY
RED LOG: BHCS ON 09!24/97
ANGLEAT TOP PFRF: 4° ~ 9844'
Note: Refer to Production ~ for hiatoricat perf data
SIZE. SPF INTERVAL OpnlSgz DATE
2-12" 6 9844 - 9t~7 O 10V02/03
2-1/7' 6 9864-9882 O 1Q102/03
2-12" 6 9688 - 9~6 O 10102/03
2-1n' s ssoo - ssos o 1 aua2/o3
2-112" 8 9910 -9925 O 07/19!98
2-112" 4 9928 -9940 O 08106199
2-12" 8 9945 -9982 O 07/30f98
I PBTD I
41/2" LNR, 12.6N, 1-80 BUTT-M, H 10187'
.0152 bpt, ~ = 3.958"
gg03' H FISH - OLD TA IL PACE (05/28108)
DATE REV BY COMMENTS DATE REV BY COMMENTS
08/29197 JLM ORIGINAL COMPLETION 03/05!09 RLM/SV OBSTRUCTION 02/27/09
OB102/~ N3S RWO
04/18108 TFAlfLH TBG CUT (04/07/O>g
10115/08 HB/JMD ORLG DRAFT CORRECT~NS
10!25108 PJC DRAWING CORRECTONS
01/03109 HB/PJC FINAL DRLG DRFT CORRECTIONS
PRUDHOE BAY UNR
WELL: Z-03
PERMR No: 1971310
API No: 50-029-22787-00
SEC 19, T11N, R1ZE, 978' FNL 3 142T FWL
BP Exploration (Masks)
LFfEA1a = FMC
CTUATOR = BAKER C
KB. ELEV = 83.75'
BF. ELEV = 54.05'
KOP= 2573'
Max Angle = 35' ~ 5780'
Datum MD = 9860'
Datum
Z ~O 3A SAFETY: '"' 4-1/2' CF~OME TIEING °' 3" GAP
BETW RSHOT ~ 9505' 8~ LTP ~ 9508""
oroposed CTD sidetrac
2101' 9-5/8" TY PE H ES CEMENTER
2240' 41 /2" HES X NIP, ID = 3.813"
ND = 8800' SS
20" CONDUCTOR, 91.5#, H-40, ID = 19.124" 110'
9-5/8" CSG, 40#, L-80 ETC, ID = 8.835" 3104'
Minimum ID = 2.375" @ 9330'
4-112" KB LTP
GAS LIFT MANDRELS
9 3264 3225 28 KBG2-1 R DOME BK 16 06!27/08
8 4213 4020 33 KBG2-1 R DMY BK 0 05/30/08
7 5577 5168 33 KBG2-1 R DOME BK 16 06/17/08
6 63.96 5843 33 KBG2-1 R DMY BK 0 05!30/08
5 7217 6531 33 KBG2-1 R DOME BK 16 06/27108
4 7830 7044 34 KBG2-1 R DMY BK 0 05/30/08
3 8440 7558 32 KBG2-1 R DOME BK 16 0627/08
2 8686 7936 28 KBG2-1 R DMY BK 0 05/30/08
1 9205 8223 13 KBG2-1 R SO BK 24 0627108
9273' I-{ 41 /2" HES X NIP, ID = 3.813"
I Tubing Punches 9320'
9~4' T' X 4112" BKR S-3 PKR, ID = 3.875"
4-1 /2" KB LTP, ID = 2.375" 9395'
9318' ~ 41 /2" HES X NIP, ID = 3.813"
4-112" BOT Packer Whipstock 9470' 9400' Top of 2-3'S" chrome liner
Cement Retainer 94$5'
9440'
Top of 3-3/16" liner
Tubing Punch 9490'
41/2" TBG, 12.6#, 13CR VAM TOP, 9495'
.0152 bpf, ID = 3.958" 7°
9502' H FISH -OBSTRUCTION (02/27/09)
9505' 7" X 41 /2" UMI OVERSHOT
950$' 7" X 5" ZXP LTP w / HMC LNR HGR, ID = 4.375"
9528' S" X 4-1 /2" XO, ID = 3.958"
91 603' I~ FISH - OLD TA IL PIPE (05/28/08)
7" CSG, 26#, L-80 BUTT-M, .0383 bpf, ID = 6.276" 9700'
PB~FORATION SUMMARY
REF LOG: BRCS ON 09V24l97
ANGLE AT TOP PERF: 4° (~ 9844'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz []ATE
2-1 /7' 6 9844 -9857 O 10/02/03
2-1/7' 6 9864 - 9882 O 10/02103
2-117' 6 9888 -9896 O 10/02!03
2-12" 6 9900 - 9906 O 10/02/03
2-12" 8 9910 -9925 O 07/19198
2-117' 4 9928 -9940 O 08106/99
2-12" 8 9945 -9982 O 07/30/98
I PBTD I
/2" LNR, 12.6#, L-80 BUTT-M~ H 10187'
DATE DATE REV BY COMMENTS
09128/97 JLM ORIGINAL COMPLETION 03/05/09 RLMISV OBSTRUCTION (0227!09)
06102/08 N3S RWO 0427/09 MSE PROPOSED CTD SIDETRACK
04/18/08 TFAlTLH TBG CUT (04/07/08)
10/15/08 HBIJMD DRLG DRAFT CORRECTIONS
1025/OB PJC DRAWING CORRECTONS
01/03!09 HB/PJC FINAL DRLG DRFT CORRECTIONS
9702' 3-3/16" liner to TSGR
I2-318" Chrome Liner to TD II
PRUDHOE BAY UNIT
WELL: Z-03A
PERMIT No:
API No: 50-029-22787-01
SEC 19, T11 N, R12~ 976' FNL & 1427' FWL
BP Exploration (Alaska)
~
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
August 14, 2009
,.~~:,s~~..~'`~~~".~ :''_'~' t -. ~~ ~,~~J
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPB Z-Pad
Dear Mr. Maunder,
~
bp
~~~iE~~EL~'
OCT 0 5 2009
~las~C~ Dil F~ Gas Con~. Cor~ni~R~pn
Anchora~e
~ ~~-~ 131
~` ~'3
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Z-
Pad that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
~ •
BP Exploration (Alaska ) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Date
Z-Pad
8/13/2009
Well Name
PTD #
API #
Initial top of
cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na ai
Z-01 B 2081080 50029218300200 NA 0.2 NA 3.40 7/24/2009
Z-02A 1960430 50029218140100 NA 0.4 NA 3.40 7/24/2009
Z-03 1971310 50029227870000 NA 1.3 NA 11.90 7/24/2009
Z-04A 2042300 50029219900100 NA 1.5 NA 14.50 7/24/2009
Z-05 1900780 50029220560000 NA 1 NA 8.50 7/24/2009
Z-06 1880320 50029217980000 NA 0.1 NA 1.70 7/24/2009
Z-07A 1931100 50029220460100 NA 2 NA 17.00 7/24/2009
Z-08A 1931280 50029217870100 NA 0.2 NA 2.55 7/24/2009
Z-09A 2081410 50029219670100 NA 0.2 NA 1.70 7/24/2009
Z-10 1891160 50029219860000 NA 1.3 NA 11.10 7/24/2009
Z-11A 2050310 50029220530100 NA 0.2 NA 1.70 7/26/2009
z-12 1891020 soo2s21sn000o NA 1.2 NA 8.50 7/2s/20os
Z-13A 2042030 50029220690100 NA 3.6 NA 24.66 7/26/2009
Z-146 2060990 50029218440200 NA 0.2 NA 1.70 7/26/2009
Z-15 1880880 50029218490000 NA 0.2 NA 1.70 7/26/2009
Z-is 1920120 50029222450000 NA 0.3 NA 2.55 7/26/2009
Z-17 1891390 50029220010000 NA 3.7 NA 34.00 7/26/2009
Z-18 1890960 50029219710000 NA 0.2 NA 1.70 7/26/2009
Z-19A 2061050 50029222510100 NA 0.2 NA 1.70 7/26/2009
Z-20 1881000 500292t8590000 NA 0.2 NA 1.70 7/26/2009
Z-21A 2001010 50029219380100 NA 0.2 NA 1.70 7/23/2009
Z-226 1960350 50029220370200 NA 0.5 NA 5.10 7/23/2009
Z-23B 2041080 50029219500200 NA 0.3 NA 1.70 7l23l2009
Z-24 1890180 50029219170000 NA 0.3 NA 2.55 7/23/2009
Z-25 1881590 50029219020000 NA 0.2 NA 1.70 7/23/2009
Z-26A 2060790 50029219450t00 NA 0.3 NA 3.40 7/23/2009
Z-27 1900310 50029220220000 NA 0.2 NA 2.55 7/25/2009
Z-28 1881270 50029218790000 NA 0.2 NA 1.70 7/25/2009
Z-29 1890650 50029219540000 NA 0.2 NA 1.70 7/25/2009
Z-30A 2032190 50029220130100 NA 0.2 NA 3.40 7/25/2009
Z-31 1881120 50029218710000 NA 0.3 NA 3.40 7/26/2009
Z-326L1 1970350 50029219246000 NA 0.2 NA 1.70 7/25/2009
Z-33A 1890050 50029218950100 NA 0.5 NA 3.40 8/8/2009
Z-35 1980930 50029228840000 NA 1.3 NA 11.50 7/4/2009
Z38 1980600 50029228730000 NA 1.2 NA 11.90 7/26/2009
Z-39A 2042240 50029229950100 NA 3.8 NA 39.90 7/25/2009
Z-46A 2052030 50029232800100 NA 1.7 NA 13.60 7/26/2009
Z-100 2031710 50029231820000 NA 5 NA 45.90 7/23/2009
Z-1o1 2001620 50029229780000 NA 1 NA 10.20 7/23/2009
Z-102 2070500 50Q29233530000 NA 1.5 NA 15.30 7/25/2009
Z-103 2042290 50029232350000 NA 1.5 NA 10.20 7/25/2009
Z-108 2052010 50029232920000 NA 1.5 NA 11.90 7/24/2009
Z-i i 2 2071720 5002923380000o NA surface NA
• STATE OF ALASKA ~OB
' AL~ OIL AND GAS CONSERVATION COMI~RSSION
~ ~ ~
REPORT OF SUNDRY WELL OPERATIONS
A~BS~~ l.fli '~1 L~k ' rY `, t a` `Y, `JI~}i'
~~
1. Operations Performed: ~'`.~_ '
^ Abandon
®Repair Well . ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
~
c~~~5
~~
i
t
®P
ll
i
^
^
^
r s
ng ,~9~.~\
~
u
Tub
ng- Perforate New Pool
Other
Waiver
^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension
2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number:
BP Exploration (Alaska) lnc. ®Development ^ Exploratory 197-131
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22787-00-00
7. KB Elevation (ft): 83 75' - 9. Well Name and Number:
PBU Z-03 '
8. Property Designation: 10. Field /Pool(s):
ADL 028262. Prudhoe Bay Field / Prudhoe Bay Pool
11. Present well condition summary
Total depth: measured 10187 ~ feet
true vertical 9210 ~ feet Plugs (measured) None
Effective depth: measured 10101 feet Junk (measured) 9603' p~ c~ ~`~ ~~~fc~ ~~
~
true vertical 9124 feet ~~
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 80' 20" 80' 80' 1490 470
Surface 3072' 9-5/8" 3104' 3080' 5750 3090
Intermediate 9670' 7" 9700' 8724' 7240 5410
Production
Liner 679' 4-1/2" 9508' - 10187' 8533' - 9210' 8430 7500
~~t~l~~IIVE~ AJG ~ ~; 2008
Perforation Depth MD (ft): 9844' - 9982'
Perforation Depth TVD (ft): 8868' - 9005'
4-1/2", 12.6# 13Cr 9505'
Tubing Size (size, grade, and measured depth):
Packers and SSSV (type and measured depth): 7" x 4-1/2" Baker'S-3' packer 9294'
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment description including volumes used and final pressure:
13. Re resentative Dail Avera a Production or In'ection Data
Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure
Prior to well operation:
Subsequent to operation:
14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work:
^ Exploratory ®Development ^ Service
® Daily Report of Well Operations
16. Well Status after work:
® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
Contact Frank Roach, 564-4373 308-099
Printed Na a Sondra Stewman Title Drilling Technologist
Si ature ~ Prepared By Name/Number:
Phone 564-4750 Date ~~ "~ ~ ondra Stewman, 564-4750
Form 10-404 Revised 04/2006 ®~ I ~ ~ ~ ~ ~ ~~~ ~~~ ~ ~ z00~ Submit Original~my"/
"'- / [~
FREE = 4~-1 /16" CAMERON
WELL'HFAD= 11"FMC
ACTUATOR = BAKER
KB. ELEV = 83.75'
BF. ELEV...- 54.05'
KOP = 2573'
Max Angle = 35 @ 5780'
Datum MD = 9860'
Datum TV D = 8800' SS
sYr ^ ~t-t[" i
9-5/8" CSG, 40#, L-80 BTC, ID = 8.681"
7" MA RKER JOINT
Minimum ID = 3.813" @ 9723'
41/2" HES X NIPPLE
I4-112" TBG, 12.6#, 13Cr-80 Vam Top, ,0152 bpf, I
TOP OF4-1/2" LNR
17" CSG, 26#, L-80, .0383 bpf, ID = 6.276" I
I 9495' I
PERFORAT~N SUMMARY
REF LOG: BHCS ON 09/24/97
ANGLE AT TOP PERF: 4 @ 9844'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 6 9844 - 9857 O 10/02/03
2-1/2" 6 9864 - 9882 O 10/02/03
2-1l2" 6 9888 - 9896 O 10/02/03
2-1/2" 6 9900 - 9906 O 10/02/03
2-1/2" 8 9910 - 9925 O 07/19/98
2-1/2" 4 9928 - 9940 O 08/06/99
2-1/2" 8 9945 - 9982 O 07/30/98
PBTD 10101'
4-1/2" LNR, 12.6#, L-80 MOD-BUTT,
.0152 bpf, ID = 3.953"
Z-03
S OTES: ***4-1 /2" CHROMETBG"*"
2239' ~ 4-1/2" HES X NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
9 0264 3225 28 CAM DCK BEK 6/1/2008
H 4213 4020 33 CAM DMY SBK 6/1/2008
7 5577 5168 33 CAM DPv1`( SBK 61112008
6 6396 5843 33 CAM DMY SBK 6/1i'2008
5 7217 6531 33 CAtvt DMY SBK 6x1/2008
4 7830 7044 34 CAM DMY SBK 6(112008
3 8440 7558 32 CAM DMY SBK 6/112008
2 8886 7936 2H CAM DMY SBK 8/112008
1 9205 8223 13 CAM DMY SBK 8/1!2008
~i~ 4-112" HES X NIP, ID = 3.813°
9294' 7" x 4-112" BKR S-3 PKR, ID = 3.875"
9318' 4-1(2" HES X NIP; ID = 3.813"'
9495' I--17"x4-1/2" UMI overshot
9603' (-j FISH: OLD TAIL PIPE {05I28t08)
DATE REV BY COMMENTS DATE REV BY COMMENTS
09/28!97 JLM ORIGINAL COMPLETION 06/02/08 N3S RWO
09/14/03 JCM/TLP GLV C/O 06/05/08 /TLH CORRECTIONS
05/18/05 WRR/PJC ELMD CORRECTION
08/26/07 SV PERFORATIONS (10/02/03)
10/01/07 JPK/PJC DRAWING CORRECTIONS
01/17/08 JLJ/PJC SET PX PLUG (10/02/07)
PRUDHOE BAY UNIT
WELL: Z-03
PERMfr No: 1971310
API No: 50-029-22787-00
SEC 19, T11N, R12E, 976' SNL & 1427' EWL
BP Exploration (Alaska)
Wel I History •
Well Date Summary
Z-03 3/23/2008 ****W ELL S/I ON ARRIVAL**** (drift & tag)
TAG PX PLUG ~ 9500' MD W/ 2.70" CENT & SAMPLE BAILER (NO SAMPLE RECOVERED)
****LEFT WELL S/I, TURNED OVER TO PAD-OP****
Z-03 3/26/2008 T/I/O=SSV/300/150, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS). Pre RWO prep.
PPPOT-T: Stung into test void to check pressure (100 psi), bled to 0 psi. Pump through void until clean fluid
returns were achieved. Pressured void to 5000 psi for 30 min test, lost 150 psi in 15 min, lost 0 psi in second
15 min (PASS). Bled void to 0 psi. Functioned LDS (ET style), all moved freely with no sign of damaged
pins.
PPPOT-IC: Stung into test void to check pressure (300 psi), bled to 0 psi. Pump through void until clean
fluid returns were achieved. Pressured void to 3500 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in
second 15 min (PASS). Bled void to 0 psi. Functioned LDS (ET style), all moved freely with no sign of
damaged pins.
Z-03 4/6/2008 ***W ELL SHUT IN ON ARRIVAL*** INITIAL T/I/O = 700/350/200 PSI
CURRENTLY RIH W/ 2.5" JET CUTTER IN PROGRESS ***LOG CONTINUED ON 7 APRIL 08***
Z-03 4!7/2008 ***LOG CONTINUED FROM PREVIOUS DAY*** INITIAL T/I/O = 700/350/200 PSI
RIH W/ 2.5" JET CUTTER TO CUT 3.5" TBG. TUBING CUT ~ 9,472'.
FINAL T/I/O = 450/350/180 PSI ***WELL LEFT SHUT IN & TURNED OVER TO DSO***
Z-03 4/12/2008 T/I/0=650/260/320 Circ Out, CMIT TxIA PASSED to 3500 psi, MIT OA PASSED to 2000 psi (Pre RWO)
Pumped down Tbg thru jet cut and up IA, taking returns to flowline with 5 bbl Meth, 500 bbls 1% KCL, 75 bbls
diesel, U-tubed diesel TxIA. Pumped 7.2 bbls of diesel to reach test pressure for CMIT TxIA, T/IA lost 40/40
psi in first 15 min and 20/20 psi in second 15 min for a total loss of 60/60 psi. Pumped 4.8 bbis diesel to
reach test pressure for MITOA, OA lost 100 psi in first 15 min and 20 psi in second 15 min for a total loss of
120 psi. Freeze protected Flowline with 5 bbls of neat. FWHP's= 80/80/60
Z-03 4/14/2008 T/I/0=280/280/30. SI. Bleed WHPs to 0 psi post-circ (pre-rig). GLT line ~ 1780 psi. Flow line (~ 280 psi.
TBG FL near surface, IA FL (~ surface. OA FL near surface. Bled OAP from 30 psi to 0 psi in 15 minutes.
Gas to fluid. Bled IAP &TBG pressure from 280 psi to 0 psi in 2 hours. Monitored 30 minutes. No increase
in pressures. Final WHPs=O/VAC/0
Z-03 4/19/2008 T/I/0=220/310/0+. Temp=Sl. Bleed WHP's to 0 psi for BPV (RWO prep). A/LP=1820 psi, SI ~ companion.
Bled TP &IAP simultaneously for 3 hrs, 45 mins.TP=O psi, IAP=30 psi. Tbg was fluid, then gas; IA was gas,
then mixed. When SI, IAP would turn to gas, then FTS. Bled OAP to 0 psi in <1 min (gas). Monitored 15
mins (during RD). TP increased 10 psi, IAP increased 30 psi, OAP remained the same during monitor.
**Note: Closed the laterals on both the A/L line & F/L. Tagged & notified FO. Bled both to 0 psi. A/L lateral
was leaking slightly, so maintained an open bleed on A/L during the IAP bleed. Final T/I/0=10/60/0.
Z-03 4/19/2008 T/I/0=0/0/0; Set 4-1/16" CIW H BPV thru tree pre-RWO; 1-2' ext. used, tagged ~ 96"; ***Complete***
(Best/Wortham)
Z-03 4/19/2008 T/I/O = 15/100/0+. Temp = SI. Bleed WHP's to 0 psi for BPV verify serviced wing valve (RWO). F/L SI ~
grove (10psi). A/L SI ~ gate & lateral valves (420 psi). Bled TBG pressure to 0 psi in 30 min (all gas). SI,
~p~rt ~ monitored for 30 min while grease crew serviced A/L gate & lateral valves. No change in pressure. Bled IAP
to 0 psi in 2hrs, 30 min (all gas). SI, monitored for 30 min. IAP increased to 0+ psi. **Valve crew installed
BPV after bleed**. Final WHP's =BPV/0+/0+.
Z-03 4/27/2008
Z-03 4/27/2008
Z-03 5/25/2008
Z-03 5/26/2008
Z-03 6/9/2008
Z-03 6/9/2008
T/I/0= 0/0/0. Pulled 4 1/8 CIW TWC ~ 84" 3x5' ext used. No problems.
T/I/0=0/0/0. PULLED 4 1/8 CIW "H" BPV ~ 96" 1X2' EXT USED NO PROBLEMS.
***ASSIST NABOBS RIG 3S*** MAKE TWO LIB RUNS (2.10", 1.75") TO 3 1/2" X-NIPPLE
THAT FELL TO -9600' SLM, IMPRESSIONS OF COLLAR. ***CONTINUED ON 05-26-08 WSR****
***RIG JOB CONT. FROM 5/25/08*** RAN 2.50" P. BAILER SEVERAL TIMES TO 6900' SLM.
RECOVERED 3 OTS. TOTAL OF METAL SHAVINGS. ***RDMO AS PER RIG REP***
Assorted sizes ,rod and fishneck assemblys
T/I/O =VAC/0/0 Pull 4 1/16" CIW H BPV Post Rig.
Print Date: 6/30/2008
• •
BP EXPLORATION
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03
Event Name: WORKOVER
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 3S
Date From - To Hours Task Code NPT
4/26/2008 101:00 - 08:30 I 7.50 I MOB I P
08:30 - 13:00 4.50 MOB P
13:00 - 22:30 9.50 RIGU P
22:30 - 00:00 1.50 WHSUR P
4/27/2008 00:00 - 01:30 1.50 WHSUR P
01:30 - 03:00 1.50 WHSUR P
03:00 - 07:00 4.00 KILL P
07:00 - 08:30 I 1.501 WHSUR I P
08:30 - 10:30 2.00 WHSUR P
10:30 - 14:00 3.50 WHSUR P
14:00 - 18:00 4.00 WHSUR P
18:00 - 20:00 2.00 WHSUR P
20:00 - 21:00
21:00 - 23:00
1.001 WHSURIP
2.001 PULL I P
23:00 - 00:00 1.00 PULL P
4/28/2008 00:00 - 06:00 6.00 PULL P
06:00 - 09:00 3.001 PULL P
09:00 - 10:00 1.00 PULL P
10:00 - 11:30 1.501 PULL P
Start: 4/24/2008
Rig Release: 6/2/2008
Rig Number:
Phase
PRE
PRE
PRE
Page 1 of 20 ~
Spud Date: 9/1/1997
End: 6/2/2008
Description of Operations
Rig released from MPF-94 ~ 01:00 hours. Rig down rig
modules and prep for move. Wait 1 hour on part for PEAK
truck (fuel pump).
Depart MPF pad. Notified AOGCC w/ 24 hour notice for BOPE
testing (Chuck Scheve)
MIRU on Z-03. Spot carrier, pipe shed and pit modules.
Connect all lines. (Raise and scope derrick at 21:00 hrs).
Install burms and handrails,Tigertank and hard line. Rig
DECOMP Rig up hard line and install second annulus valve to Tree. Take
on seawater.
DECOMP Steam and test hard line to 1,500 psi to closed choke and 500
psi from choke to Tiger tank.
DECOMP PUMU lubricator Well techs II BPV D WHP's:
Tbg/IA/OA-10/100/Opsi.
DECOMP PJSM with vac truck drivers and crew. Pump down the tubing
with returns through choke to Tiger tank, 425 bbls of 130 deg F
seawater at 3 1/2 BPM, 850 psi, IA pressure to 1400 psi with
gas and crude in returns. Circulate until clean returns.
DECOMP Flow check well. Tbg and IA stable (no flow_ no vac . Dry rod
DECOMP ND tree. Inspect hanger threads- ok. 5 turns w/ 4 1/2" NSCT
to MU to hanger. Chuck Scheve waived AOGCC's right to
witness BOPE testing.
DECOMP NU DSA, PU BOPE from cradle, NU
DECOMP Function test BOPE, fill stack with water and heat annular
element. BOPE test to 250 psi low, 3500 psi high with 3 1/2"
test joint.
DECOMP Perform pre-tour checks, load and strap 3-1/2" DP in pipe
shed, PU control line spooler to rig floor. Change out power
tongs to 4-1/2", PU Otis shooting nipple.
DECOMP PU/MU lubricator, Well techs pull TWC, LD lubricator and
shooting nipple.
DECOMP PU/MU landing joint with safety valve, screw into hanger, FMC
rep BOLDS. Observe well. Held PJSM with FMC,
Schlumberger and Rig Team. Pulled tubing hanger to floor,
65K PUW. BO/LD landing joint and tubing hanger.
DECOMP POH LD 3-1/2" 9.2# TDS, L-80, tubing completion assembly
with dual control line.
DECOMP Continue to POH LD 3-1/2", 9.2#,TDS, L-80, tubing conpletion
assembly, with continuios hole fill. Steam on Well Head with
OA open and hard lined to Tiger tank. Recovered 71 SS bands.
150 joints (292 and 1-cut joint total) LD at 06:00 hrs.
DECOMP Continue POH with 3 1/2" completion. On joint # 195 as POH,
6 to 8 each holes in pipe the size of silver dollars. , osition of
bad tubin 'oint would hav Continuous hole fill.
Joints 218 - 223 sever) corroded, holes the length of joint, split
in some places. Last of Tbg recovered - 26'- 6" of joint # 243
DECOMP 3 GLM's, 49 full joints, 1 cut joint, - 5' stub, of tubing left in
hole. -1890" of tubing left in hole. Secure well, clean and clear
rig floor. Estimated Top of Fish -7751.
DECOMP Strip and cut drilling line.
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION Page 2 of 20
Operations Summary Report
Legal Well
Common W
Event Nam
Contractor
Rig Name:
Date Name: Z
ell Name: Z
e:
Name:
From - To -03
-03
WORKOVER
NABORS ALASK
NABORS 3S
Hours Task
DRI
Code
LING
NPT
Start
I Rig
Rig
Phase
Spud Date: 9/1/1997
: 4/24/2008 End: 6/2/2008
Release: 6/2/2008
Number:
Description of Operations
4/28/2008 11:30 - 13:30 2.00 PULL P DECOMP PU rathole and install. PUMU kelly.
13:30 - 16:30 3.00 WHSUR P DECOMP PUMU 1 ea 4 3/4" DC w/ 4 3/4" Bumper sub, XO, and packoff
pulling tool. Mark DC, strap in hole and engage 9 5/8" x 7"
ackoffs. PU and pull packoffs free with 5K overpull. PUMU
new packoffs, RIH and seat in Csg spool. RILDS. Test
packoffs to 3500 psi - ok.
16:30 - 17:00 0.50 FISH P DECOMP BOLD packoff running tool and bumper sub. MU 6.875" ID
wear ring and install. LD running tool and DC. EPOCH
calibrate block height, rotary speed and torque.
17:00 - 17:30 0.50 FISH P DECOMP EPOCH calibrate block height, look to repair rotary torque and
speed, but had to order parts.
17:30 - 20:00 2.50 FISH P DECOMP PU/MU Baker fishino spear BHA: Spear, xo sub, DC, xor sub,
xo sub, bumper sub, Bowen oil jar, pump out sub, DC =
120.27'. Held PJSM with Baker fisherman and Rig Team,
perform pre-tour checks.
20:00 - 00:00 4.00 FISH P DECOMP PU and rabbit 3-1/2", 13.3#, DP, RIH 90 joints at 00:00 hrs.
(-2913')
4/29/2008 00:00 - 04:00 4.00 FISH P DECOMP Continue PU and rabbit 3-1/2" 13.3# DP and RIH with tubing
spear from 2913' to joint 200 (6314').
04:00 - 08:30 4.50 FISH P DECOMP PJSM. PU Kelly remove elevators and bells, torque up
connections. Pressure test to 3500 psi. Set back Kelly. Had
failure on upper Kelly Cock. Had to heat and work valve to get
pressure test.
08:30 - 10:30 2.00 FISH P DECOMP Continue to RIH picking up 3 1/2" DP from pipe shed, from
Joint #200 to #243.
10:30 - 11:00 0.50 FISH P DECOMP PUMU Kelly. Establish fishing parameters. PUW of 115K,
SOW of 85K with Kelly, 1 BPM / 200 psi. RIH and engage
Fish. PU 10 ft 'ars tri and Fish fall off. Slack off re-en
Fish. PU w/ 135K PUW (20K extra weight).
11:00 - 14:00 3.00 FISH P DECOMP Circulate surface to surface with 8.5 ppg seawater at 2 BPM /
', 1,300 psi through the Choke to the Pits. Gas in returns from
downhole circulated through the Gas Buster. No crude seen it
returns at an oint, circulate unto clean, as tree returns on
surface. MW in = 8.5 ppg , MW out = 8.6 ppg.
14:00 - 15:30 1.50 FISH P DECOMP Set back Kelly, POH with Fish from 7,751' to 6,920' and stand
back in Derrick, with continuous hole fill.
15:30 - 17:00 1.50 FISH P DECOMP Pump 100 bbls seawater down the Tubing taking returns to the
Tiger tank at 2 BPM / 1,400 psi to finish off loading the truck
and fill the Pits with clean seawater.
17:00 - 19:00 2.00 FISH P DECOMP Continue to POH with Fish from 6,920' to 5,735' with
continuous hole fill.
19:00 - 19:30 0.50 FISH P DECOMP Rig service of EPOCH (Rig watch monitoring system) rotary
torque.
19:30 - 21:30 2.00 FISH P DECOMP Continue to POH from 5,735' to 120' with continuous hole fill.
21:30 - 23:30 2.00 FISH P DECOMP BO/LD Baker fishing tools (ITCO Spear Assembly) and change
to 3-1/2" power tongs and handling tools.
23:30 - 00:00 0.50 FISH P DECOMP POH LD the Fish: 3-1/2", 9.2#, TDS, L-80, Tubing completion
from Joint #244 to Joint #254. The 5' of Tobin Stum from
the art in the Tobin that was ex ected on to of GLM #3 was
not there onl the Pu Joint above the GLM.
4/30/2008 00:00 - 02:00 2.00 FISH P DECOMP Continue POH LD the Fish: 3-1/2", 9.2#, TDS, L-80, Tubing
completion from Joint# 254 to Joint# 293 and 3 GLMs, Pup, X
Nipple, and the cut was in the 10' Pup Joint below the X-Nipple,
rnmea: aiswzuun `J:ZJ:00 HM
• •
BP EXPLORATION Page 3 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABORS 3S Rig Number:
Date !From - To Hours Task Code NPT Phase Description of Operations
__ _
4/30/2008 00:00 - 02:00 2.00 FISH P DECOMP length of cut = 8.67'. No external pitting or holes observt
02:00 - 03:00 1.00 FISH P
03:00 - 04:00 1.00 FISH P
04:00 - 12:00 8.00 FISH P
12:00 - 13:00 1.00 FISH P
13:00 - 13:30 0.50 FISH P
13:30 - 15:00 1.50 FISH P
15:00 - 18:00 3.00 FISH P
18:00 - 21:00 ~ 3.00 ~ FISH ~ N
21:00 - 00:00 ~ 3.00 ~ FISH ~ P
5/1/2008 100:00 - 01:00 I 1.001 FISH I P
01:00 - 03:30 I 2.501 FISH I P
03:30 - 06:00 2.50 FISH P
06:00 - 07:00 1.00 FISH P
07:00 - 09:00 I 2.001 FISH I P
DECOMP Clean and clear rig floor of handling tools and prep to PU new
BHA.
DECOMP PU/MU Packer Mill Assembl : 6-1/8" Mill, 2 ea Bootbasket, Bit
sub, Bumper sub, Oil jar, Pump out sub, 9 ea 4-3/4" DC.
Overall Length = 279.30'.
DECOMP PU 7 ea 4-3/4" DC and RIH with Packer Mill assembly on
3-1/2" DP from derrick to 15 stands in hole at 06:00 hrs.
DECOMP Tag at 9,435' with 10K down. PUMU Kelly. PUW = 150K ,
SOW = 112K. Break circulation at a rate of 2 bpm / 200 psi
and RIH with the Kelly. Wash the Kelly down completely 30'. It
appears that we to ed 'unk in the well ossibl from corr
Tubin and were able to wash down throw hit Set back
Kelly.
DECOMP PU Joint #294 of DP and PUMU Kelly. Break circulation at a
rate of 3 bpm / 425 psi and wash down through the junk.
Engage Rotary Table at 60 RPM with RW = 120K and 900
ft-Ibs of torque. Solid tag at 20' in on the Kelly = 9,455'.
DECOMP EPOCH rep on location to calibrate the new sensors for Rotary
RPM and Rotary Torque prior to milling on the Packer.
DECOMP Mill on the Packer per Baker Fishing rep's recommendations.
PUW = 150K ,SOW = 112K , RW = 127K , 2,000 ft-Ibs of
torque , 90 RPM, 15K weight on mill , 3 bpm / 500 psi. Depth
of mill at 9456'.
DECOMP Rig crew responded to smoke coming from the Draw works, a
hydraulic hose ruptured under Draw works resulting in a leak.
ADW HSE Safety Advisor and RWO Operations
Superintendent were notified. x5700 was notifed. GPB SRT
arrived, inspected area and performed clean up. They
indicated that the incident would be classified a leak due to
100% containment.
DECOMP Continue milling on the Packer per Baker Fishing rep's
recommendations. PUW = 150K ,SOW = 112K , RW = 127K ,
2,000 ft-Ibs of torque , 90 RPM, 15K weight on mill , 3 bpm /
500 psi. Depth of mill at 9457'.
DECOMP Continue millin on the Packer per Baker Fishing rep's
recommendations. PUW = 150K ,SOW = 112K , RW = 127K ,
2,000 ft-Ibs of torque , 90 RPM, 15K weight on mill , 3 bpm /
500 psi. Depth of mill at 9,457'.
DECOMP Took 8 bbl it ain due to as mi ration after rubb rs ille
ate. Pumped 320 bbls down the Tubing taking returns
through the Choke to the Pits, 3 BPM at 450 psi. Shut down to
observe well - no flow.
DECOMP Continue to mill on packer at 9,457'.
DECOMP At a de th of 9,458' the mill ushed throw h the last of the
Packer. RIH with the remainder of the Kelly. PU a single Joint
of DP and push the bod of the Packer to the to of the 4-1/2"
Liner to a final de th of 9 510' 3SMD. The well is static with no
losses noted.
DECOMP Circulate bottoms up with clean seawater to ensure we have a
clean wellbore at a rate of 3 bpm / 400 psi. Pumped a total of
Printed: 6/30/2006 9:25:56 AM
• •
BP EXPLORATION Page 4 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABOBS 3S Rig Number:
Date ~ From - To ~ Hours Task 'ail Code ' NPT Phase I Description of Operations
5/1/2008 07:00 - 09:00 2.00 FISH P DECOMP 260 bbls. No losses observed during circulation.
09:00 - 14:30 5.50 FISH P DECOMP POOH with BHA #2 standing back DP in the Derrick.
Maintaining continuous hole fill while POOH.
14:30 - 15:00 0.50 FISH P DECOMP On surface with BHA #2. Break off a I
There is about 50% wear -good indication. Inspect and empty
out two bootbaskets. They were full of fine metal cuttings and
shavings.
15:00 - 16:00 1.00 WHSUR P DECOMP Pull 6-7/8" Wear Ring. Set Test Plug. RU Test Equipment.
16:00 - 17:00 1.00 BOPSU P DECOMP Pressure test the Annular with 3-1/2" Test Joint to 250 / 3,500
psi due to having closed it while circulating gas bubble out after
• milling Packer.
17:00 - 18:00 1.00 FISH P DECOMP MU BHA #3 as follows: 3-1/4" ITCO Spear• XO, bumper sub,
oil jar, pump out sub, 8 ea 4-3/4" DC. OAL = 270.13'.
18:00 - 18:30 0.50 FISH P DECOMP Rig service and perform pre-tour checks.
18:30 - 00:00 5.50 FISH P DECOMP RIH with Packer spear assembly on 3-1/2" DP from derrick to
8,250'
5/2/2008 00:00 - 01:30 1.50 FISH P DECOMP Continue RIH with Packer spear assembly on 3-1/2" DP from
derrick, from 8,250'to 9,125'.
01:30 - 03:00 1.50 FISH P DECOMP PU 2 additional Joints of DP and the Kelly. PUW = 142K and
SOW = 120K. Taaaed top of Fish at 9,510', enoage Fish with,
15K down on no- o no dra noted when ickin u with i h.
03:00 - 09:30 6.50 FISH P DECOMP POH with BHA #3, standing back 3-1/2" DP in derrick, with
continuos hole fill.
09:30 - 10:00 0.50 FISH P DECOMP On surface with BHA #3 - no Fish. Inspect the Grapple and no
indication of it ever attempting to grab onto anything, still in the
set position. Consult with Anchorage Engineering and Baker
Fishing Shop and decision made to go in with an extended
Spear Assembly and Grapple to grab the Tubing in the Tailpipe
beneath the Packer. Break out and lay down the Spear
Components.
10:00 - 12:00 2.00 FISH N DECOMP Wait on Baker Fishing Components to arrive on location.
Monitor the well and obtain static loss rate -well is static, no
', visual loss of fluid.
12:00 - 12:30 0.50 FISH P DECOMP New Spear and Grapple arrives on location. PUMU BHA #4 as
follows: Bowen ITCO pear with 3.001" rapple, Bumper Sub,
Oil Jar, Pump Out Sub, 8 ea Drill Collars. OAL = 277.97'.
12:30 - 17:30 5.00 FISH P DECOMP RIH with BHA #4 on 3-1/2" DP from the Derrick and PU 2 joints
DP from pipe shed to 9,497'.
17:30 - 21:00 3.50 FISH P DECOMP Ta to of Fish at 9 51 'PUW = 145K and SOW = 115, PU
Kelly, work and rotate pipe to enter Fish with Mud pump, 26PM
at 640 PSI, slid into Fish 10' with pump off and set 20K down
on Fish. Observed 15K over pull, drop ball and rod and
attempted to shear the Pump out sub at 3,000 PSI with out
success.
21:00 - 00:00 3.00 FISH P DECOMP Set back and blow down Kelly. Observed over pull decreasing
as first 5 stands were pulled. POH with BHA #4 slow with
continuous hole fill, pipe coming wet, 20 stands out at 00:00
hrs, depth of 7,600'.
5/3/2008 00:00 - 07:30 7.50 FISH P DECOMP Continue POH with fishin assembl (BHA #4) coming wet,
standing 3-1/2" DP in Derrick from 7,600 to surface with
continuous hole fill.
07:30 - 08:00 0.50 FISH P DECOMP On surface with BHA #4. No Fish, No Jo .The Grapple
shows indication of biting on something and is not in proper
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION
Operations Summary Report
Page 5 of 20
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABOBS 3S Rig Number:
Date From - To Hours i Task ~ Code i NPT ~ Phase i Description of Operations
5/3/2008 07:30 - 08:00 0.50 FISH P DECOMP condition to re-run in the hole. The Pump Out Sub was
completely packed off with sand/fill/dope and this prevented the
dart from ever getting on seat. Clean out the Pump Out Sub.
Confer with Anchorage Engineer and decision made to re-run
the same BHA back in the hole.
08:00 - 10:00 2.00 FISH N DECOMP Wait on new 3.001" Grapple to arrive from Baker Fishing.
Service the Rig while waiting on tools to arrive.
10:00 - 11:00 1.00 FISH P DECOMP PUMU BHA #5 with the same com onents as BHA #4. Clear
the ID of the Spear Assembly due to being completely packed
off with sand/fill/dope. The first stand of Drill Collars was also
packed off.
11:00 - 17:00 6.00 FISH P DECOMP TIH with BHA #5 on 3-1/2" DP from the Derrick.
17:00 - 00:00 7.00 FISH P DECOMP In with 148 stands (296 Jts) of 3-1/2" DP. PUMU Kelly. PUW
= 150K ,SOW = 110K. Break circulation at a rate of 3.5 bpm /
1,700 psi and pump a full DP volume plus before entering the
Fish, pumped a total of 70 bbls. Wash down to top of Fish and
~
Kell 9 510' with no
slide into the Fish at 13' in on the
problems. Continue washing down slowly to attempt and clear
any fill/sand inside the Tubing. Swallow 8' (21' in on the Kelly)-
and begin POH slowly. Latched onto the Fish but not free. Jar
multiple times to attempt to free ourselves. Max straight pull
utilized 225K. At 21:00 hrs, confer with Anchorage Engineers
and decision was made to increase to 235K max pull and
suspend Jarring at 00:00 hrs.
5/4/2008 00:00 - 00:30 0.50 FISH P DECOMP Disen a from th Fish 1 ' with B k r r
00:30 - 07:30 7.00 FISH P DECOMP Inspect Derrick after Jarring. Blow down and set back Kelly.
POH with BHA #5 standing back 3-1/2" DP in Derrick.
07:30 - 08:00 0.50 FISH P DECOMP On surface with BHA #5. Break out and lay down components.
08:00 - 08:30 0.50 WHSUR P DECOMP Pull Wear Ring. Set Test Plug.
08:30 - 13:00 4.50 BOPSU P DECOMP Pressure test BOPE to 250 / 3,500 psi per BP / AOGCC
Regulations. The state's right to witness the test was waived
by John Crisp at 07:30 hrs on 5/4/2008. The test was
witnessed by Wellsite Leader, Toolpusher and Driller. Confer
with Anchorage Engineer and the decision made to run back in
with the Packer Milling Assembly and finish milling the bottom
of the Packer and the XO below it to leave 3-1/2" Tubing
Tailpipe looking up.
13:00 - 13:30 0.50 WHSUR P DECOMP Pull Test Plug. Set 6-7/8" 1D Wear Ring.
13:30 - 15:00 1.50 BOPSU P DECOMP Pressure test Upper Kelly Valve - OK.
15:00 - 16:00 1.00 FISH P DECOMP PUMU BHA #6 components the same as BHA #2 -Packer
16:00 - 17:00 1.00 FISH P DECOMP Cut 105' and slip drilling line.
17:00 - 18:00 1.00 FISH P DECOMP TIH with BHA #6 on 3-1/2" DP from the Derrick, 30 stands in
hole.
18:00 - 18:30 0.50 FISH P DECOMP Rig service and perform per-tour checks.
18:30 - 22:30 4.00 FISH P DECOMP Continue RIH with BHA #6 on 3-1/2" DP from Derrick, 148
stands in hole.
22:30 - 00:00 1.50 FISH P DECOMP MU Kell and to at 9 ', set back Kelly and LD 1 joint DP.
5/5/2008 00:00 - 00:30 0.50 FISH P DECOMP PU 20', 3-1/2" DP Pup. MU Kelly.
00:30 - 04:00 3.50 FISH P DECOMP Mill on the Packer per Baker Fishing rep's recommendations.
PUW = 155K ,SOW = 110K , RW = 127K , 6,000 - 12,000
ft-Ibs of torque , 90 RPM, 10K weight on mill , 3 bpm / 450 psi.
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION
Operations Summary Report
Page 6 of 20
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABOBS 3S Rig Number:
Date j', From - To I', Hours Task Code ~ NPT
5/5/2008 104:00 - 10:30 6.50 FISH P
10:30 - 12:30 I 2.001 FISH I P
12:30 - 14:00 1.50 FISH P
14:00 - 15:30 1.50 FISH P
15:30 - 20:30 5.00 FISH P
20:30 - 00:00 3.50 FISH P
5/6/2008 100:00 - 03:30 3.501 FISH P
03:30 - 04:00 0.50 FISH P
04:00 - 09:00 5.00 FISH P
09:00 - 16:00 I 7.001 FISH I P
16:00 - 17:00 ~ 1.00 ~ FISH ~ P
17:00 - 18:00 1.00 FISH P
18:00 - 21:00 3.00 FISH N
21:00 - 00:00 I 3.001 FISH I P
5/7/2008 100:00 - 08:30 I 8.501 FISH I P
08:30 - 09:00 0.50 FISH P
09:00 - 10:00 1.00 FISH P
Phase Description of Operations
DECOMP Set back the Kelly and LD 20'. POH from 9,504' with BHA #6
standing back 3-1/2" DP in Derrick. 22 stands out at 05:30 hrs.
DECOMP On surface with BHA #6. Break out and la down BHA
components with Baker Fishing rep. Inspect mill -about 75%
even wear. PUMU BHA #7 the same as BHA #5 with added
Intensifier -Spear Assembly with 3.001" Grapple.
DECOMP TIH with BHA #7 on 3-1/2" DP from the Derrick.
DECOMP Hold weekly safety meeting with crew on location due to
inclement weather and remote distance from Milne Point Base
Camp.
DECOMP Resume TIH with BHA #7 on 3-1/2" DP from the Derrick.
DECOMP In with 147 stands and a single (295 Jts) of 3-1/2" DP. PUMU
Kelly and 20' DP pup ,PUW = 150K ,SOW = 110K. Break
circulation at a rate of 2.5 bpm / 1,100 psi and pump a full DP
volume plus before entering the Fish, pumped a total of 70
bbls. Wash down to top of Fish and slide into the Fish 2',
attempts to wash deeper failed and drill string became plugged,
begin POH slowly. Latched onto the Fish but not free. Jar
multiple times to attempt to free ourselves. Max straight pull
utilized 250K. Jarring up at 9,508.'
DECOMP Continue to Jar on Fish at 9,508'. Jar up at 270K, max straight
pull of 300K. Came free at 03:00 hrs.
DECOMP Set back Kelly, LD 20' DP pup and 1 joint DP.
DECOMP Circulate and condition well at 2-1/2 bpm / 260 psi. Inspect
Derrick after Jarring operation. Gas breaking out of returns on
surface with bottoms up. Slow pump rate to safely circulate
until gas break out subsides. Continue circulating on bottom at
a rate of 2 bpm / 200 psi until discussion with Anchorage on
local Phase 2, Level 3 conditions. Service the Rig and thaw
out frozen lines.
DECOMP POOH with BHA #7 standing back DP in the Derrick
maintaining continuous hole fill with seawater.
DECOMP On surface with BHA #7. Recovered the bottom 1.5' feet of
Packer, the 2' long 4-1/2" x 3-1/2" XO and the collar of the 10'
pup below the XO. The Collar OD = 4.0" and the threads are
still in the inside of the Collar. We parted right at the
conn lion. BOLD BHA #7 components. Confer with
Anchorage Engineering and decision made to wash over the
remaining 40' of tailpipe down to the top of the 4-1/2" Liner.
DECOMP Clear and clean Rig Floor.
DECOMP Wait on fishing tools to be delivered. Still in Phase 2 Level 3
weather conditions.
DECOMP Load 5 3/4" Wash pipe in pipeshed. Strap and P/U BHA #8.
MM Wash Over Shoe, 2 jts of 5 3/4" Wash pipe, Drive sub, XO,
2 Boot baskets, XO, Bumper Sub, Oil Jar, Pump Out Sub, 8
DC's. Total BHA Length = 347.07'
DECOMP RIH with Washpipe Assembly on 3-1/2" DP from derrick from
347'. Tag the top of the Fish 9.5' in on Joint #295 (147 stands
and asingle) = 9,513'.
DECOMP PUMU Kelly. PUW = 155K ,SOW = 110K. Re-tag top of Fish
at same de th of 9 513'.
DECOMP Check Rotary Brake prior to starting the cleanout operation.
Work on the Brake and ensure in proper condition.
WAIT
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION Page 7 of 20
Operations. Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABOBS 3S Rig Number:
Date From - To Hours Task li Code ! NPT Phase ',I Description of Operations
5/7/2008 10:00 - 12:30 2.50 FISH P DECOMP Attempt to get on Fish but it appears the outside of it is packed
with fill. Circulate the long way to attempt and clean it up at a
rate of 3 bpm / 500 psi. Rotate the Kelly with 60 RPM 7,500
ft-Ibs of free torque and RW = 128K. Observe small amounts
of sand in returns after 200 bbls away.
12:30 - 13:30 1.00 FISH P DECOMP Line up to reverse circulate and wash down on top of the Fish.
Break reverse circulation at a rate of 3 bpm / 900 psi with about
5K weight on shoe -not making any hole.
13:30 - 16:00 2.50 FISH P DECOMP PU off of the Fish and line up to go the long way. Break
circulation at a rate of 3 bpm / 425 psi with 10K weight on shoe.
Engage Rotary Table at 75 RPM with 10,000 ft-Ibs of torque.
Wash down on top of Fish and continue RIH with the Kelly.
Getting small amounts of sand and fine metal across the
Shakers. Made it 17' in on the Kelly to a depth of 9,520' and
encountered hard bottom unable to make more hole. PU
slightly off bottom.
16:00 - 18:00 2.00 FISH P DECOMP Pump hi-vis sweep around the long way at a rate of 3.5 bpm /
600 psi. Fine sand and metal cuttings back with sweep.
18:00 - 21:00 3.00 FISH P DECOMP Reverse circulate a hi-vis sweep around 3.5 bpm with 1,650
psi. Sweep brought up fine sands with metal cuttings. P/U off of
fish and shut pump down. S/O over fish with out problems 2
times.
21:00 - 21:30 0.50 FISH P DECOMP B/O and blowdown kelly. Stand back kelly.
21:30 - 00:00 2.50 FISH P DECOMP POOH with BHA #8, standing back 3-1/2" DP in the derrick.
Maintain continuous hole fill.
5/8/2008 00:00 - 03:30 3.50 FISH C DECOMP POOH with BHA #8 standing back 3-1/2" DP in the derrick.
Maintain continuous hole fill.
03:30 - 05:00 1.50 FISH C DECOMP Stand back 4-3/4" DC's, UD Washpipe Assembly. Recovered a
small iece of fish in Washover Shoe. Empty boot baskets,
recovered 2 gallons of metal cuttings and fine sand. 75% metal
cuttings and 25% fine sand.
05:00 - 06:00 1.00 FISH C DECOMP M/U BHA #9 as follows: Overshot, Extension, Top Sub,
Bumper Sub, Oil Jar, Pump Out Sub, (8) Drill Collars,
Intensifier. OAL = 283.37'.
06:00 - 06:30 0.50 FISH C DECOMP Pre-tour checks and service the Rig.
06:30 - 12:00 5.50 FISH C DECOMP TIH with BHA #9 on 3-1/2" DP from the Derrick. In with 147
stands of DP from the Derrick. PU 2 singles to make stand
#148. PUMU Kelly. PUW = 144K ,SOW = 115K.
12:00 - 13:30 1.50 FISH C DECOMP Mix and circulate 1 drum of Safe Lube into the seawater
system to aid in reducing friction at a rate of 3 bpm / 350 psi.
13:30 - 14:00 0.50 FISH C DECOMP RIH with Kelly and tag the Fish at 9,503'. Work the Overshot
down 5' to swallow completely. Jar on the Fish and it came
free on the 21st hit at 250K.
14:00 - 15:30 1.50 FISH C DECOMP Circulate bottoms up at a rate of 3 bpm / 350 psi. No gas or
crude seen in the returns on surface.
15:30 - 22:30 7.00 FISH C DECOMP POOH with BHA #9 standing back 3-1/2" DP in the Derrick.
Maintain continuous hole fill while POOH.
22:30 - 23:30 1.00 FISH C DECOMP Stand back 4-3/4" DC's in derrick and break down BHA.
23:30 - 00:00 0.50 FISH C DECOMP Break out and UD fish. Recovered 10.02' of 3-1/2" tubing. Fishy
came a art at the connection with the collar on bottom of the
5/9/2008 00:00 - 00:30 0.50 FISH C DECOMP Break Out and UD Bowen Overshot.
00:30 - 02:00 1.50 FISH C DECOMP M/U BHA #10, 2-3/6" Muleshoe Jt, XO, Stabilizer/Swedge,
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03
Event Name: WORKOVER
Contractor Name: NABORS ALASKA DRILLING I
Rig Name: NABORS 3S
Date From - To Hours Task Code NPT
5/9/2008 00:30 - 02:00
02:00 - 07:00
07:00 - 07:30
07:30 - 09:30
09:30 - 12:00
12:00 - 12:30
12:30 - 14:30
14:30 - 21:30
21:30 - 22:30
Page 8 of 20
Spud Date: 9/1 /1997
Start: 4/24/2008 End: 6/2/2008
Rig Release: 6/2/2008
Rig Number:
Phase Description of Operations
1.50 FISH C DECOMP Bumper Sub, Oil Jar, Pump Out Sub, 8 4-3/4" DC's. total BHA
Length = 289.21'
5.00 FISH C DECOMP RIH with BHA #10, Tailpipe Clean Out Assembly on 3-1/2" DP
from derrick.
0.50 FISH C DECOMP PUMU Kelly. PUW = 143K ,SOW = 120K. Break circulation
at a rate of 2 bpm / 160 psi and attempt to make hole without
rotation - no Joy.
2.00 FISH C DECOMP Pull off and engage Rotary Table at 20 RPM and 2,000 ft-Ibs of
torque. RW = 125K. Tag the top of the Fish at 5' in on the
Kelly = 9.513'. Wash down with 1-2K weight on Muleshoe and
circulating at 3 bpm / 350 psi. Work the KeNy down to 23' in =
2.50 FISH C DECOMP Pull out of the hole and observe drag coming out, highest
overpull seen was 35K overpull to 180K. Pull off of the Fish.
RIH with circulation at a rate of 3 bpm / 375 psi and no rotation
to same depth we cleaned out. Pull off of the Fish and reverse
circulate a hi-vis sweep at a rate of 4 bpm / 1,000 psi surface to
surface. Lots of real fine sand seen before the sweep arrived
on surface and also suspended in the sweep.
0.50 FISH C DECOMP Pre-tour checks and service the Rig with new crew on the
Slope today.
2.00 FISH C DECOMP Attempt to wash back down to the same depth achieved with
no success. Work down to 13' in on the Kelly several times
and bottom out, it appears that we may be beside the Fish.
7.00 FISH C DECOMP Blow down and set back Kelly. POOH with BHA #10 standing
back 3-1/2" DP in the Derrick with continuous hole fill.
1.00 FISH C DECOMP Standback DC's and B/O and L/D BHA #10, Clean Out
Assembly. The muleshoe on the 2-3/8" tubing stinger was
comoletly bent over inside the end of the stinger and a 1-1/2" x
1-1/2" niece of the milled packer slip was wedged inside the
22:30 - 23:30 1.00 FISH P DECOMP M/U BHA #11. Overshot Assembly. Overshot, Overshot
Extension, Top Sub, Bumper Sub, Oil Jar, Pump Out Sub, 8
4-3/4" DC's, Intensifier. Total BHA Length = 283.37'
23:30 - 00:00 0.50 FISH P DECOMP RIH with BHA #11, Overshot Assembly on 3-1/2" DP from
derrick.
5/10/2008 00:00 - 05:00 5.00 FISH P DECOMP RIH with BHA #11, Overshot Assembly on 3-1/2" DP from
derrick to 9,502'
05:00 - 05:30 0.50 FISH P DECOMP P/U Kelly and establish paramenters 143K up and 118K down.
Pump at 1/2 bpm with 50 psi and wash over top of fish at
9 513', pressured up to 400 psi. Shut down pump and bleed off
pressure. P/U to 225K and hit jars, pull to 250K, repeat one
time. P/U to 250K and hit jars, pull to 275K, Repeat one time.
Fish came loose. Pump through string at 1/2 bpm with 50 psi
pressure. Slack off and tag with no increase in pump pressure
and no excess pull when picking up string.
05:30 - 07:30 2.00 FISH P DECOMP Circulate bottoms up at 4 bpm with 500 psi pump pressure.
Pumped a total of 320 bbls of seawater. No gas or crude seen
07:30 - 11:30 4.00 FISH P DECOMP Blow down set back Kelly. POOH with BHA #11 standing back
DP in the Derrick maintaining continuous hole fill with
seawater. 40 stands out at 09:30 hrs. Stop at 11:30 hrs to
calibrate the rig monitoring system with EPOCH rep.
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION Page 9 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABORS 3S Rig Number:
Date From - To Hours ' Task Code NPT Phase Description of Operations
5/10/2008 11:30 - 14:00 2.50 FISH N DECOMP Work on Rotary RPM, pump pressure and flow in /flow out
monitoring systems with EPOCH rep. Replaced old flowline
paddle measuring device with a new one and calibrated it.
14:00 - 17:00 3.00 FISH P DECOMP Resume POOH with BHA #11 standing back DP in the Derrick
with continuous hole fill.
17:00 - 19:30 2.50 FISH P DECOMP On surface with BHA #11. Recovered a 4.33' Fish of 3-1/2"
Tubin .This should leave a roximatel 6' of Tubin lookin
up past the top of the 4-1/2" Liner Top. The Overshot
Assembly was packed off with fine sand making it difficult to
remove the Fish from the Overshot. The Fish had evidence of
the Washover Assembly (BHA #8) being over it. Clear and
clean Rig floor.
19:30 - 21:00 1.50 FISH P DECOMP BH Overshot Assembly. Overshot, Overshot
Extension, Top Sub, Bumper Sub, Oil Jar, Pump Out Sub, 8
4-3/4" DC's, Intensifier. Total BHA Length = 283.37'. Removed
packoff from Mill Control.
21:00 - 22:00 1.00 FISH P DECOMP RIH with BHA #12, Overshot Assembly on 3-1/2" DP from
derrick to 3,386,
22:00 - 23:30 1.50 FISH P DECOMP Slip and Cut 125' of drilling line. Inspect brakes on drawworks.
23:30 - 00:00 0.50 FISH P DECOMP Continue to RIH with BHA #12, Overshot Assembly on 3-1/2"
DP from derrick.
5/11/2008 00:00 - 02:00 2.00 FISH P DECOMP Continue to RIH with BHA #12, Overshot Assembly on 3-1/2"
DP from derrick to 7,105'.
02:00 - 04:30 2.50 FISH P DECOMP M/U TIW and Dart Valves, Pressure up to 100 psi on the
annulus and perform stripping drill. Stripped in 3 stands of DP
maintaining an additional 100 psi working range. Bleed off
pressure and POOH 3 stands. B/O and L/D TIW and Dart
Valves. Blow down Kill, and Choke lines, Blow down Choke
Manifold.
04:30 - 06:00 1.50 FISH P DECOMP Continue to RIH with BHA #12, Overshot Assembly on 3-1/2"
DP from derrick. In with 148 stands (296 Jts) of DP.
06:00 - 06:30 0.50 FISH P DECOMP Pre-tour checks and service the Rig.
06:30 - 07:00 0.50 FISH P DECOMP PUMU Kelly. Establish parameters: PUW = 143K ,SOW =
118K , 3 bpm / 350 psi , 30 RPM , 4,500 ft-Ibs free torque , RW
= 128K.
07:00 - 08:30 1.50 FISH P DECOMP Wash down and attempt to latch the Fish: Bottom out with a
hard bottom at 17' in on the Kell = 9 520' (same depth the
Washover Assembly bottomed out). Try several times to latch
the Fish - no Joy. No drag or noticeable change in PUW
observed. Park the BHA at 14' in on the Kelly.
08:30 - 10:00 1.50 FISH P DECOMP Reverse circulate surface to surface at a rate of 3.5 bpm / 575
psi to attempt and remove more sand from the wellbore, No
ma'or sand seen in returns. Attem t to RIH and latch Fish
a ain - no Jo .
10:00 - 16:00 6.00 FISH P DECOMP Blow down and set back Kelly. POOH with BHA #12 standing
back DP in the Derrick with continous hole fill. 35 stands out at
11:30 hrs. 75 stands out at 13:00 hrs.
16:00 - 17:00 1.00 FISH P DECOMP On surface with BHA #12, no Fish. Break out and lay down
components. The bottom of the Cut Lip Guide was flattened
indicating we were on the 4-1/2" Liner Top. Give AOGCC rep
Jeff Jones a 2-3 hour call out for upcoming BOPE test. Confer
with Anchorage Engineering on plan forward. Decision made
to re-run the 2-3/8" Muleshoe Cleanout Assembly and have
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION Page 10 of 20
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date From - To
5/11/2008 16:00 - 17:00
17:00 - 18:00
18:00 - 00:00
5/12/2008 00:00 - 00:30
00:30 - 02:00
02:00 - 08:30
08:30 - 09:00
09:00 - 10:00
10:00 - 10:30
10:30 - 11:00
11:00 - 14:30
14:30 - 15:30
15:30 - 19:00
19:00 - 21:00
21:00 - 23:30
23:30 - 00:00
5/13/2008 100:00 - 00:30
Z-03
Z-03 Spud Date: 9/1 /1997
WORKOVER Start: 4/24/2008 End: 6/2/2008
NABOBS ALASKA DRILLING I Rig Release: 6/2/2008
NABOBS 3S Rig Number:.
Hours Task 'i Code ~ NPT i Phase II Description of Operations
!
1.00 -_
FISH
P -_
DECOMP
Little Red assist with the cleanout run.
1.00 WHSUR P DECOMP Pull 6-7/8" ID Wear Ring and set Test Plug.
6.00 BOPSU P DECOMP M/U test assembl and test BOPE to 250 psi low and 3,500
psi high. Tested Blinds, Annular Preventer, VBR's, HCR and
Manual Choke and Kill Valves, Choke Manifold, Floor Valves,
Upper Kelly and Lower Kelly Valves. 4-1/2" and 3-1/2" Test
joints were used. Each test was held for 5 minutes on the
Chart. Performed Koomey drawdown test. No Failures. Test
was witnessed by BP WSL, Nabors Toolpusher and Jeff Jones
with the AOGCC. All Gas Monitors were tested with the tests
witnessed by Jeff Jones of the AOGCC. There were no
Failures.
0.50 WHSUR P DECOMP Pull test plug and install 6-7/8" ID Wear Bushing
1.50 CLEAN P DECOMP R/U and M/U BHA #13, cleanout Assembly. 1 Jt of 2-3/8" tbg
w/ Muleshoe, XO, 5-3/4" Swedge-Stablizer, Bumper Sub, Oil
Jar, Pump out Sub, 8 4-3/4" DC's. Total BHA Length = 299.96'
6.50 CLEAN P DECOMP RIH with BHA #13 on 3-1/2" DP from the Derrick. LD Joint
#296 and pick up a 20' pup joint of DP.
0.50 CLEAN P DECOMP PU and MU the Kelly.
1.00 CLEAN P DECOMP Work on unplugging the cement line prior to starting the
operation. RU Little Red to the cement line.
0.50 CLEAN P DECOMP Pre-job safety meeting with Nabors Crew, Little Red, CH2M Hill
and Baker Fishing on the cleanout operation.
0.50 CLEAN P DECOMP Pressure test with Little Red to 3,500 psi - OK.
3.50 CLEAN P DECOMP Establish paramters: PUW = 143K ,SOW = 118K. Break
circulation at a rate of 3 bpm / 350 psi. Tag at 13' in on the
Kell = 9 520'. POOH and engage the Rotary Table at 25 RPM
with 4,000 ft-Ibs of torque and RW = 128K. RIH and tag at 10'
in on the Kelly. Notice pump pressure increase to 500 psi.
Wash down with 1-2K weight on muleshoe. Wash down to 25'
in on the Kelly with rotation = 9.533,. POOH and park the BHA
at 23' in on the Kelly.
1.00 CLEAN P DECOMP Mix and pump a 30 bbl hi-vis sweep the long way and chase
with both the Rig Pump and Little Red in tandem at a rate of
6.5 bpm / 2,000 psi. Lots of tine sand a_nd rust from the ID of
the Pi a in the returns.
3.50 CLEAN P DECOMP Resume washing and rotating down with the same parameters.
RIH with the Kelly to 28' in on the Kelly = 9,536'. Pump
Pressure increased to 650 psi at 3-1/2 bpm. Picked up and had
increased dra to 175K.
2.00 CLEAN P DECOMP Mix and pumped 30 bbl hi-vis sweep the long way and chased
with both Rig Pump and Little Red in tandem at 7 bpm with
2,500 psi pump pressure. Sweep brought up fine sand and pipe
scale.
2.50 CLEAN P DECOMP Line up and reverse circulate a 30 bbl hi-vis sweep with both
the Rig Pump and Little Red in tandem at 4.5 bpm with 3,200
psi pump pressure. Sweep brought back lots of fine sand and
i e scale.
0.50 CLEAN P DECOMP Establish parameters and resume washing. SOW = 118K,
PUW = 143K, RW = 129K, 25 rpm with 3,000 fUlbs torque and
340 psi pump pressure at 3 bpm
0.50 CLEAN P DECOMP Wash and Ream. At 9,533' noticed increase in pump pressure
to 600 psi at 3 bpm. Washed down to 9,537'. DOK 29'. Work
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION Page 11 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABOBS 3S Rig Number:
Date From - To Hours Task Code' NPT Phase Description of Operations
5/13/2008 00:00 - 00:30 0.50 CLEAN P DECOMP weight on muleshoe up to 5K and 4K torque at 25 rpm. Would
~o longer drill off. Picked up and saw pressure drop 4' off
bottom. When slacking off we saw pressure increase at 9,533'
again without taking weight. Slacked off to 9,537' and started
taking weight.
00:30 - 01:30 1.00 CLEAN P DECOMP Blow down and stand back Kelly, Slowdown and R/D Little Red
Pump Truck and lines.
01:30 - 02:30 1.00 CLEAN P DECOMP Hold Safety Meeting with Crew.
02:30 - 08:30 6.00 CLEAN P DECOMP POOH with BHA #13, standing back 3-1/2" DP in Derrick.
08:30 - 09:30 1.00 CLEAN P DECOMP On surface with BHA #13 -break out and lay down
components. The 2-3/8" Muleshoe was in very poor shape.
There are markings /gouges on it indicating that we still have
some metal downhole (slip segments?). The joint was almost
cut in half 8.5' u from the bottom. The joint had good
indication that we entered the 3-1/2" tubing tailpipe a total of
17.5' in which would put us at 9,537 - 9,538'. Confer with
Anchorage Engineering on plan forward and get tools heading
to location from the Baker Fishing Shop.
09:30 - 11:30 2.00 CLEAN P DECOMP PUMU BHA #14. 4-1/2" 5 Blade Mill, XO, XO, 6 1/8" Stabilizer
sub, DP sub, 2 ea 4-3/4" Boot baskets, bit sub, bumper sub,
bowen oil jar, pump out sub, and 8 ea 4-11/16" DC's.
OAL-289.57'
11:30 - 17:30 6.00 CLEAN P DECOMP RIH w/ BHA #14 on 3 1/2" DP from Derrick to 9,508'
17:30 - 18:00 0.50 CLEAN P DECOMP Pick up Kelly.
18:00 - 21:30 3.50 CLEAN P DECOMP Suck out and Clean pits and take on 2% KCL water with 2#
Barazan into pit 2.
21:30 - 22:00 0.50 CLEAN P DECOMP Pump 2% KCI with 2# Barazan down DP and Annulus to cover
BHA.
22:00 - 00:00 2.00 CLEAN P DECOMP Establish parameters, PUW = 142K, SOW, 120K, RotW =
132K, 50 rpm with 4,000 ft/Ibs torque, 440 psi pump pressure
at 3.5 bpm. Wash down and start milling while displacing. T~
TOL at 9 520'. Mill at 50 rpm with 5,000 - 7,000 ft/Ibs of torque,
WOM = 3,000 - 6,000#, 420 psi pump pressure at 3 bpm.
5/14/2008 00:00 - 03:00 3.00 CLEAN P DECOMP Mill at 50 rpm with 5,000 - 8,000 ft/Ibs of torque, WOM = 3,000
- 6,000#, 420 psi pump pressure at 3 bpm. Mill to 9,525'.
Pump pressure incresed to 550 psi and torque increased to
9,000 ft/Ibs as XO no/go'd out on Liner Top.
03:00 - 05:30 2.50 CLEAN P DECOMP Circulate hole clean
05:30 - 06:00 0.50 CLEAN P DECOMP Break out and blow down Kelly, Stand Kelly back.
06:00 - 07:30 1.50 CLEAN P DECOMP Crew change. POH 5 stands pulling wet. Load 1" ball and
pump to seat and shear PO sub with 2100 psi.
07:30 - 13:00 5.50 CLEAN P DECOMP POH standing back 3 1/2" DP. Still pulling wet as 2% KCL w/
2# Biozan is very viscous. 45 stands OOH ~ 09:30. 90
Stands OOH C~ 11:00. At DC's ~ 13:00. Continuous hole fill
with no losses as POH
13:00 - 14:00 1.00 CLEAN P DECOMP Stand back 8 ea 4-11/16" DC's, break out PO sub to re-dress.
Empty boot baskets and recover -3/4 gallon of metal cuttings
from tubing stub.
14:00 - 15:00 1.00 CLEAN P DECOMP PU single joint of 2-3/8" DP with cut-rite muleshoe, xo, 6 1/8"
stabilizer, DP sub, 2 ea boot baskets, bit sub, bumper sub,
bowen oil jars, PO sub (re-dressed) and 8 4-11/16" DC. BHA
OAL - 314.16'
15:00 - 16:00 1.00 CLEAN P DECOMP Clean and clear rig foor. RIH w/ 10 stands of 3 1/2" DP.
Printed: 6/30/2008 9:25:56 AM
•
BP EXPLORATION
Operations Summary Report
Page 12 of 20
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABOBS 3S Rig Number:
Date From - To Hours Task Code NPT Phase ' Description of Operations
5/14/2008 16:00 - 18:00 2.00 CLEAN P
18:00 - 18:30 0.50 CLEAN P
18:30 - 22:30 4.00 CLEAN P
22:30 - 23:00 0.50 CLEAN P
23:00 - 00:00 1.00 CLEAN P
5/15/2008 100:00 - 05:00 I 5.00 I CLEAN I P
05:00 - 06:00 1.00 CLEAN P
06:00 - 13:00 7.00 CLEAN P
13:00 - 14:30 1.50 CLEAN P
14:30 - 15:30 1.00 CLEAN P
15:30 - 17:30 2.00 CLEAN P
17:30 - 23:30
23:30 - 00:00
5/16/2008 100:00 - 01:00
01:00 - 03:00
03:00 - 03:30
03:30 - 06:00
6.00 I CLEAN I P
DECOMP Stripping in the hole drill. Strip in 2 stands of DP, POH with 2
stands stripped in and B/O and L/D Dart and TIW valves. Blow
down choke manifold and choke line.
DECOMP Service Rig, Inspect derrick for ice build up.
DECOMP RIH with BHA #15 on 3-1/2" DP from derrick to 9,511'
DECOMP Pick up and make up Kelly.
DECOMP Establish parameters, PUW = 151 K, SOW = 110K, RotW
128K, 30 rpm with 6,500 ft/Ibs of torque, 470 psi at 2 bpm.
Wash down, took 3k down weight at 9,525' .Tagged at 9,531',
wash and ream with 3-5K weight on muleshoe. 60 rpm with
7-8K ft/Ibs of torque.
DECOMP Wash down with 3-5K weight on muleshoe. 60 rpm with 8,500
ft/Ibs of torque. Pumping 2.5 bpm with 550 psi. Pump pressure
increased to 950 psi at 9,537', P/U and wash back down at
9,540' pressured up to 2,600 psi, shut off pump and pressure
remained on string. Bled off pressure and Picked up on string
and dragged up 6' at 60K overpull, jars hit at 50K overpull.
String weight came back to 150K. Picked up out of 3-1/2"
tail i e to 9,515' and attem ted to circulate. Pressured up to
240 psi and shut off pump. Pressure maintained at 240 psi.
Bleed off pressure.
DECOMP Drop ball and shear out circulating sub. Sheared at 2,350 psi.
Break out and stand back Kelly
DECOMP Derrick inspection to clear ice. POH w/ BHA #15 (pulling wet).
11:30 @ 105 stands OOH and pipe start pulling dry.
DECOMP Stand back 8 ea DC's. Break out PO sub, jars, bumper sub, 2
boot baskets. Recovered -1 quart of small metal shavings.
PU 2-3/8" wash pipe. Did not recover pron Missin mill face
-1 inch on bottom where it was worn off.
Inside of wash pipe, on the very end, grooved to match fishing
neck of prong. Inside tattle tale ~ 2' bent over. Outside of
wash pipe junk cut BADLY, (almost completely in two).
Outside of wash pipe junk cut along 15' + from end of joint.
DECOMP Clean and clear rig floor. Call town and discuss.
DECOMP PUMU 1.875" spiral grapple with extension on 2- 1/8" DC, xo, 6
1/8" stabilizer, sub, 2 boot baskets, xo, bumper sub, bowen oil
jar, PO sub, 8 4-3/4" DC's. OAL - 320.38'
DECOMP RIH with BHA #16 on 3-1/2" DP from derrick to 9,515'. Break
0.50
1.00
CLEAN
CLEAN
P
P
DECOMP
DECOMP circulation at 3,423' and 6,514'.
P/U Kelly and establish parameters. PUW = 151 K, SOW =
112K, 1 bpm with 550 psi.
Wash over fish with 1 bpm and 550 psi, tag at 9,539' and set
down 25K pressure went up to 1,120 psi, shut o pump, P U to
175 and bleed down jars, P/U to 200K pulled up 5-6' and came
free, Pump at 1 bpm with 550 psi. Slack off to 9,540' set down
35K, pressured up to 1,350 psi, P/U to 175K bleed jars, P/U to
200 K pulled up 5-6' with drag then came free. Pump at 1 bpm
and the pressure was 550 psi. Made repeated attempts did not
see increase in ressure or an excess dra .
2.00 CLEAN P DECOMP Drop ball and shear out circulation sub, sheared at 2,300 psi.
Circulate bottoms up at 4 bpm with 650 psi.
0.50 CLEAN P DECOMP B/O and blowdown Kelly. Standback Kelly.
2.50 CLEAN P DECOMP POOH standing back 3-1/2" DP. Maintain continuous hole fill.
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION Page 13 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABORS 3S Rig Number:
Date from - To Hours Task Code NPT Phase Description of Operations
5/16/2008 06:00 - 10:00 4.00 CLEAN P DECOMP POH wet until stand #105.
10:00 - 11:30 1.50 CLEAN P DECOMP Stand back 4-11/16" DC's. Boot baskets empty, break off
overshot for 1.875" spiral grapple. Muleshoe junk cut and tip
bent. Heavy scarring on muleshoe and tacks grooved 18" up
11:30 - 12:00 I 0.501 CLEAN 1 P
12:00 - 13:00 I 1.001 CLEAN I P
13:00 - 15:30 2.50 CLEAN P
15:30 - 17:30 2.00 CLEAN P
17:30 - 21:30 4.00 CLEAN P
21:30 - 00:00 2.50 CLEAN P
5/17/2008 100:00 - 06:00 I 6.00 I CLEAN I P
06:00 - 08:00 2.00 ~ CLEAN ~ P
08:00 - 09:00 I 1.00 I CLEAN I P
09:00 - 15:00 6.00 ~ CLEAN ~ P
15:00 - 16:00 I 1.001 CLEAN I P
16:00 - 17:00 I 1.001 CLEAN I P
17:00 - 18:00 1.00 CLEAN P
18:00 - 19:00 1.00 CLEAN N
19:00 - 19:30 0.50 CLEAN P
19:30 - 20:00 0.50 CLEAN P
20:00 - 00:00 4.00 CLEAN P
5/18/2008 00:00 - 00:30 0.50 CLEAN P
00:30 - 10:30 10.00 CLEAN P
Nubbing torn off grapple control, and spiral grapple missing
(left in hole). Grapple housing swelled for -8" from bottom of
MS.
DECOMP Clean and clear rig floor. (Very slimy from 2% KCL w/ 2#
Biozan pulling wet.)
DECOMP PUMU BHA #17: 4-1/4" - 5 blade mill, xo, 1 jt of 3-1/8" DC, xo,
6 1/8" stabilizer, DP sub, 2 boot baskets, bit sub, bumper sub,
Bowen oil jar, PO sub, 8 ea 4-11/16" DC's. OAL - 317.15'
DECOMP RIH w/ BHA #17.
DECOMP 85 stands in the hole. Strip and cut drill line.
DECOMP Continue RIH w/ miliing BHA to 9,514'
DECOMP P/U Kelly and establish parameters. PUW =150K, SOW =
110K, RotW = 126K, 60 rpm at 7K ft.lbs of torque, 3 bpm at
620 psi pump pressure. Wash down and tag at 9,524'. Mill
3-1/2" tail i e assembl from 9 524' to 9 527', Weight on mill
2-6K, 60 rpm with 9K ft/Ibs of torque, 3 bpm at 640 psi pump
pressure.
DECOMP Mill 3-1/2" tailpipe assembly from 9,527'. Weight on mill 4-6K,
60 rpm with 9K fUlbs of torque, 3 bpm at 670 psi pump
pressure.
DECOMP Mill to 9535'. Pump 30 Bbl of Flo-Vis sweep (50 cp vis),
displace w/ 150 Bbls C~? 4 BPM, 9560 psi while rotating and
reciprocating DP. Pump 2nd 30 Bbl Flo-Vis sweep and
displace OOH C~ 4 BPM 950 psi while working pipe. Circulate
500 Bbls total.
DECOMP POH above liner, drop ball-rod, pump 16 Bbls C«~ 1-1/2 BPM to
ball on seat, pressure to 1900 psi to shear PO sub. Break out,
blow down, and stand back Kelly. Lay down 10' pup joint.
DECOMP POH w/ BHA #17. Pulling wet. Contact AOGCC w/ 24 hour
notice for BOPE testing. State's right to witness waived by
Chuck Scheve.
DECOMP Stand back 8 ea 4-11/16" DC's. Break out mill. No wear on
bottom guide mill (indicates did not get on prong), upper mill
worn (~ 3.5" diameter to steel below cut-rite. Recovered 1
quart of metal shavings in boot baskets.
DECOMP PUMU BHA #18: 4-1/4" OD / 2" ID rotary burn shoe, xo,
4-1/4" sabilizer, 1 ea 3-1/8" DC, xo, 6-1/8" stabilizer, DP sub, 2
ea boot baskets, bit sub, bumper sub, bowen oil jar, PO sub,
and 8 ea 4-11/16" DC. OAL - 321.70'
DECOMP RIH w/ BHA #18 on 3 1/2" DP from Derrick. RIH 25 stands,
Secure Well
DECOMP Relief crew caught behind Doyon 14 rig move. Swap crews out
around Doyon 14 while rig was stopped on the Spine Road.
DECOMP Hold safety meeting with crew coming on tour.
DECOMP Service crown, blocks, kelly, drawworks and rotary table.
DECOMP RIH with BHA #18 on 3-1/2" DP from Derrick.
DECOMP RIH with BHA #18 on 3-1/2" DP from Derrick to 9,519'
DECOMP M/U Kelly and establish parameters. PUW = 148K, SOW =
Printed: 6/30/2008 9:25:56 AM
•
•
BP EXPLORATION Page 14 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT Phase Description of Operations
5/18/2008 00:30 - 10:30 10.00 CLEAN P DECOMP 110K, ROTW = 126K, 3 bpm at 660 psi, 60 rpm at 8K torque
off bottom. Wash down and taa at 9.533'. Mill from 9.533'.
WOM 2-6K, 60 rpm with 9-10K torque, 3 bpm with 730 psi
pump pressure. MillMill t~9535'. Work mill for 5 hours varying
torque, pump rate and weight on bit. Unable to mill further.
10:30 - 14:30 4.00 CLEAN P DECOMP Pump 30 Bbl of 50 cp Flo-Vis sweep and displace C~ 4-1/4"
BPM, 900 psi. Displace wellbore w/ Seawater. Clean pits and
load with SW.
14:30 - 21:30 7.00 CLEAN P DECOMP Stand back kelly. Load Pit #1. POH standing back 3-1/2" DP in
derrick.
21:30 - 22:30 1.00 CLEAN P DECOMP Stand back DC's and UD BHA #18, Burn Shoe Assembly.
Slight wear around outside edge of Burn Shoe and slight wear
on face of Burn Shoe. Recovered approximately 1/2 gallon of
metal cuttings in junk basket.
22:30 - 23:00 0.50 BOPSU P DECOMP Pull Wear Bushing.
23:00 - 00:00 1.00 BOPSU P DECOMP Install test plug, M/U test assemblies and fill BOPE with water.
5/19/2008 00:00 - 06:00 6.00 BOPSU P DECOMP Test BOPE, Choke Manifold, Kelly valves, and floor valves to
250 psi low and 3,500 psi high. Hold each test for 5 minutes on
the chart. AOGCC witness of test was waived by Chuck
Scheve. Test was witnessed by the BP WSL and Nabors
Toolpusher. Used 3-1/2" and 4-1/2" test joints. Perform
drawdown test on Koomey.
06:00 - 08:30 2.50 BOPSU P DECOMP Pull test plug, install wear ring. PU Kelly and test 250 / 3500
psi. Upper and lower kelly cock. Drain kelly, stand back.
Drain stack.
08:30 - 11:00 2.50 BOPSU P DECOMP ND riser, NU shooting flange. Spot SLB unit, load SLB
equipment in pipe shed and to rig floor. PJSM with all crews.
11:00 - 13:30 2.50 EVAL P OTHCMP RU SLB pessure control equipment: Lubricator, PI sub, WL
BOP's, lubricator, and packoffs. Test to 500 psi. No leaks.
13:30 - 15:00 1.50 EVAL P OTHCMP RIH w/ USIT logging tool. Tool tight through wear ring. Work
tool, then RIH to 400'. Attempt to engage sonex tool. Tool
malfunction. POH
15:00 - 16:00 1.00 EVAL P OTHCMP Break out logging tool bottom section. (sonex component).
Change out same. make up to WL BOPE, RIH for USIT log
from top of liner to surface.
16:00 - 22:00 6.00 EVAL P OTHCMP RIH w/ USIT logging tool. Log up from 9,475' to 205'
22:00 - 23:00 1.00 EVAL P OTHCMP UD USIT tool.
23:00 - 00:00 1.00 EVAL P OTHCMP P/U SFRT logging tool.
5/20/2008 00:00 - 00:30 0.50 EVAL P OTHCMP P/U SFRT logging tool.
00:30 - 04:00 3.50 EVAL N OTHCMP Attempt to test SFRT logging tool. Attemp to troubleshoot
logging tool. Unable to get tool to work. UD SFRT tool and
work on in trailer. P/U SFRT and test. Positive test.
04:00 - 10:30 6.50 EVAL P OTHCMP RIH with SFRT logging tool. Log across the Kuparuk 7550' -
7390'. Lo s show oor cement across Ku aruk resevoir.
10:30 - 13:00 2.50 EVAL P OTHCMP PJSM. Rig Down SLB tools and pressure control equipment
from rig floor.
13:00 - 14:30 1.50 EVAL P OTHCMP ND shooting flange. NU pitcher nipple and air boot.
14:30 - 16:00 1.50 FISH P DECOMP PUMU 4-1/4" 5 bladed junk mill, XO, XO, 4-1/4" stabilizer, 1 ea
3-1/8" DC, 6-1/8"" stabilizer, DP sub, 2 ea boot baskets, bit
sub, bumper sub, Bowen oil jars, PO sub, 8 ea 4-11/16" DC's.
OAL - 318.03'
16:00 - 18:00 2.00 FISH P DECOMP RIH w/ BHA #19. to 40 stands in hole.
Printetl: 6/30/2008 9:25:58 AM
~ •
BP EXPLORATION
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03
Event Name: WORKOVER
Contractor Name: NABOBS ALASKA DRILLING I
Rig Name: NABOBS 3S
' Date From - To Hours ~, Task Code NPT
5/20/2008 18:00 - 18:30 0.50 FISH P
18:30 - 22:00 3.50 FISH P
22:00 - 00:00 2.00 FISH P
5/21/2008 100:00 - 02:30 I 2.501 FISH I P
02:30 - 06:00 3.501 FISH P
06:00 - 12:30 I 6.501 FISH I P
12:30 - 14:00 I 1.501 FISH I P
14:00 - 18:00 4.00 FISH P
18:00 - 19:00 1.00 FISH P
19:00 - 20:00 1.00 FISH P
20:00 - 00:00 I 4.001 FISH I P
5/22/2008 00:00 - 01:00 1.00 FISH N
01:00 - 05:00 4.00 FISH P
05:00 - 06:00 1.00 FISH P
06:00 - 14:00 8.00 FISH P
14:00 - 15:30 I 1.501 FISH I P
15:30 - 16:30 I 1.001 FISH I P
16:30 - 17:30 1.00 FISH P
17:30 - 18:00 0.50 FISH P
18:00 - 23:00 5.00 FISH P
23:00 - 00:00 1.00 FISH P
5/23/2008 ~ 00:00 - 01:30 ~ 1.50 ~ FISH ~ P
01:30 - 03:00 ~ 1.50 ~ FISH ~ P
Start: 4/24/2008
Rig Release: 6/2/2008
Rig Number:
Page 15 of 20 ~
Spud Date: 9/1 /1997
End: 6/2/2008
Phase Description of Operations
DECOMP Service rig and perform per-tour checks.
DECOMP Continue RIH, pick up Kelly and a 10' pup to 9,510'.
DECOMP Transfer seawater from pits to Tiger tank and load pits with
8.5PPG, 2% KCL. Held PJSM with Vac truck drivers and Rig
crew.
DECOMP Displace well, 320 bbls 8.5 PPG, 2% KCL with 2 Ibs Biozan /
Safe tube, at 4 BPM / 660 PSI, taking returns to Tiger tank.
Blow down lines.
DECOMP Milling on fill at 9,530'. Weight on mill 4-6K, 70 rpm with 9K
-11 K fUlbs of torque, 4 bpm at 710 psi pump pressure, PUW =
147K, SOW = 117K, Off bottom free rotating = 126K. Pumped
Flo-Vis sweep at 03:00 hrs. and 05:00 hrs.
DECOMP Continue milling from 9533' to 9535'. Work mill @ 9535 for -5
hours varying torque, WOM, rotary speed, pump rate etc.
Makin hole extremel slowl .
DECOMP Milling ~ 9535'. Parameters: 60 rpm, 3000# WOM, 10,500
ft-Ibs rotary torque (2,500 ft-Ib over), pumping ~ 3 BPM, 500
psi. DP twisted off, PJSM with crew. Stand back kelly, hang
blocks, inspect crown, dead man, and drilling line. Rig up to
POH and lay down DP. Estimate Warted oioe ~ -3200'..
DECOMP POH laying down 3 1/2" IF, S-135, 15.50# DP (77 joints) and
26 joints of 3-1/2", 13.30 DP. Broke off 19" in on joint # 104.
DECOMP Service short bowl protector, perform per-tour checks.
DECOMP PJSM with Baker Rep, MU 3.5" overshot, overshot extension,
overshot top sub = 14.89'.
DECOMP PU 3-1/2" DP from pipe shed and RIH and engage Fish with
over shot at 3226', observed 10K over pull when pulling out of
liner.
DECOMP Replace the brake out tong hydraulic cylinder in Derrick.
DECOMP Shear the pump out sub and POH 5l stands of 3-1/2" DP.
DECOMP B/O UD fishing tools.
DECOMP POH w/ 3-1/2" DP breaking every connection, inspecting, then
re-torqueing and standing back. Pipe pulling wet. 1 bad joint of
3-1/2" DP found, 1 DC with a slight bow in it.
DECOMP BOLD fishin tools. Fish left in hole: 5 blade junk mill (4-1/4"),
3-1/8" bit sub, 3-1/8" XO with 2-3/8" regular pin twisted o . ,
DECOMP Clean and clear rig floor. Swap out 3-1/8" DC. Call for 3-1/8"
grapple for 4-1/8" over shot.
DECOMP PUMU fishin BHA #21, 4-1/8" Overshot w/ 3-1/8" spiral
grapple, XO, 3-1/8" DC. XO, 4-1/4" stabilizer, XO, 2 ea boot
baskets, xo, bumper sub, Bowen jars, PO sub, 8 ea 4-11/16"
DC's. OAL = 317.04'.
DECOMP PU Kelly and calibrate rotary torque gauge.
DECOMP RIH with BHA #21, 3-1/2" DP from Derrick to 146 stands and a
single
DECOMP PU 2 joints DP, 10' pup and the Kelly, circulate 3 BPM 600
PSI, start fishing at 9,529'. POW=157K, SOW=110K, 3 BPM /
600 PSI
DECOMP Start fishin at 9,529'. POW=157K, SOW=110K, 3 BPM / 600
PSI. Engage fish, observed 300 PSI pump pressure increase,
jars hit, made repeated attempts to engage fish at 9,531'.
DECOMP Drope ball & rod, shear pump out sub, LD 10' pup, set back
Printed: 6/30/2008 9:25:56 AM
i •
BP EXPLORATION Page 16 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABORS 3S Rig Number:
Date From - To Hours ; Task Code NPT Phase Description of Operations
5/23/2008 01:30 - 03:00 1.50 FISH P DECOMP Kelly.
03:00 - 06:00 3.00 FISH P DECOMP POH standing 3-1/2" DP in Derrick, from 9,531' to 50 stands
out at 05:30 hrs. Pipe pulling wet.
06:00 - 09:30 3.50 FISH P DECOMP POH 147 stands of 3-1/2" DP
09:30 - 10:30 1.00 FISH P DECOMP Stand back 8 ea 4-11/16" DC's. Lay down jars, bumper sub,
boot baskets. BOLD 3-1/8" Drill collar and 4-1/8" overshot.
Recoverd fish (4.25" mill w/ 2 XO's).
10:30 - 12:00 1.50 FISH P DECOMP Clean and clear rig floor. Remove all fishing tools which will no
longer be required. Service Rig.
12:00 - 18:00 6.00 FISH P DECOMP Wait on 3.95" OD x 2" ID burn-over mill.
18:00 - 19:00 1.00 FISH P DECOMP PUMU BHA #22 3.958" Washover shoe, 3-1/2" DC, xo, stab,
xo, 2 ea. boot bskt, xo, bumper sub, jars, PO sub, 8 ea 4
11/16" DC = 316.59
19:00 - 20:00 1.00 FISH DECOMP Calibrate and work on EPOCH Rigwatch system.
20:00 - 00:00 4.00 FISH P DECOMP RIH with BHA #22 on 3-1/2" DP from Derrick to 105 stands.
5/24/2008 00:00 - 01:30 1.50 FISH P DECOMP Continue RIH with BHA #22 on 3-1/2" DP from Derrick to 147
stands and 1 single to 9,504', PU Kelly and 10' pup.
01:30 - 06:00 4.50 FISH P DECOMP Establish parameters. PUW = 157K, SOW = 107K, ROTW =
125K, 3 bpm at 520 psi, 60 rpm at 8K torque off bottom, rotate
and wash down to tag Fish at 9,532', torque on bottom =
10-12K, pump pressure = 670 psi. Mill to 9,542' and PU 1 joint
DP, continue down to 9,551'. Did not tag w/mill. No-Go on
TOL w/ 6 1/8" stabilizer.
06:00 - 08:00 2.00 FISH P DECOMP Pump Hi-vis sweep surface to surface. Flow check well, pump
dry job.
08:00 - 10:30 2.50 FISH P DECOMP Call for slickline unit. POH (dry), standing back 3-1/2" DP.
10:30 - 14:00 3.50 FISH P DECOMP Take 9.6 Bbl pit gain with 46 stands 00H. MU TIW valve and
head pin. Circulate 8.5 #/gal 2% KCL / 2# Biozan. Circulate
100 Bbls of 198 Bbl surface to surface circulation. Well
increasing flow with gas. Close Annular and circulate 220 Bbls
~ 3 BPM, 470 PSI DP and 170 psi casing pressure. Shut
down and observe. DP pressure to 0 psi, Csg pressure to 0 psi
but flowing. Shut in, casing pressure to 10 - 30 psi. Bullhead
15 Bbls into formation, 1870 psi. Pressure of 1870 on DP and
Csg held tight. Bleed back to 0 psi, 22 Bbls returns and
flowina. Shut in Cso pressure 10 - 30 psi, DP pressure ~ 10
14:00 - 20:00 6.00 FISH P DECOMP Notify AOGCC of circumstances. Contact town engineer and
discuss. Order 580 Bbls of 9 #/gal brine. Circulate down DP
with returns through choke and gas buster while waiting on
brine. Flowcheck, 0 psi on DP and Csg. Open Annular, fluid
bubbling in riser. Close bag and continue to circulate while wait
on brine.
20:00 - 22:00 2.00 FISH P DECOMP Displace well at 6,680' with 9 ppg brine through choke, taking
returns to the Tiger tank. 3 BPM at 440 PSI on DP and 50 PSI
on CSG, 235 Bbls pumped. Then diverted returns to Pits, 71
Bbls of 9 PPG brine.
22:00 - 00:00 2.00 FISH P DECOMP RIH 32 stands of DP to 8,660'.
5/25/2008 00:00 - 00:30 0.50 FISH P DECOMP Continue RIH to 9 420'
00:30 - 03:30 3.00 FISH P DECOMP Circulate 9 PPG brine surface to surface for a total of 337 Bbls.
Observe well for 20 min. Well stable with no flow.
03:30 - 06:00 2.50 FISH P DECOMP POH from 9,420' with constant hole fill. 50 stands out at 05:30
hrs.
Printed: 6/30/2008 9:25:56 AM
' ! •
BP EXPLORATION Page 17 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABORS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABORS 3S Rig Number:
Date From - To Hours Task Code NPT
5/25/2008 06:00 - 07:00 1.00 FISH P
07:00 - 09:00 2.00 FISH P
09:00 - 11:30 2.50 FISH P
11:30 - 13:30 2.001 vVHSUR P
13:30 - 16:00 2.501 WHSUR P
16:00 - 19:00 I 3.00 I EVAL I P
19:00 - 00:00 I 5.001 EVAL I P
Phase !~ Description of Operations
DECOMP Crew change. PJSM with crew and new driller. Reviewed well
conditions. Service Rig.
DECOMP 148 Stands OOH.
DECOMP Stand back DC's. BOLD fishing tools and inspect mill face.
Recoverd one silver dollar size piece of what appears to be a
collar wedged in mill face. Very slight wear on mill, minimal
scarring on 3.958" OD.
DECOMP Pull wear ring. Install test plug. Unable to get a test. Reverse
rubber gasket and attempt again. Call FMC for new test plug.
DECOMP SLB on location. Load equipment into pipe shed. Install wear
ring. ND pitcher nipple, NU shooting flange. Bob Noble w/
AOGCC notified of upcoming BOPE test ~ 14:30.
DECOMP PJSM w/ SLS crew and rig crew. PUMU SLB pressure control
equipment, lubricator, BOPE, packoffs etc.
DECOMP PUMU SLB tools. PSI test lubricator to 500 psi. RIH w/ SLB
slickline. BHA: 2.10" LIB, 2.50" centralizer, 3' of 1-1/4" stem
and 2.25" centralizer. Run #2 = 3.80" centralizer, 3' of 1-1/4"
stem and 2.25" centralizer. Run #3 = 2.10" LIB, 2.50"
centralizer, 3' of 1-1/4" stem and 2.25" centralizer. Top of liner
5/26/2008 100:00 - 05:00 I 5.00 I EVAL I P
05:00 - 07:00 I 2.00 I EVAL I P
DECOMP RIH w/ SLB slickline. BHA: #4 = 2.50" Mule shoe, 10' bailer ,
2.50" centralizer, 3' of 1-1/4" stem and 2.25" centralizer. Top of
fill 9,598'. Recovered 1 piece of 1.81 "spiral grapple previously
i left in hole, on last baiter run. (Wedged in bottom of bailer
DECOMP ~ RD SLB slickline, pressure control equipment from Rig floor
and pipe shed.
07:00 - 08:00 1.00 WHSUR P DECOMP AOGCC right to witness BOPE testing waived by Bob Noble.
ND shooting flange. NU pitcher nipple and flow-line.
08:00 - 14:00 6.00 WHSUR P DECOMP PJSM for BOPE testing. Attempt to test BOPE to 250 / 3500
psi. Use 3-1/2" test joint. Unable to get full body test due to
leaking seal on rams. Tighten and re-test -fail. Call NOC for .
new seal. No critical snare parts. PU Kelly and test upper and
lower kelly cock. Perform Koomey drawdown. Replace seal in
BOPE blind ram door.
14:00 - 18:00 4.00 WHSUR P DECOMP BOPE test with 3-1/2" and 4-1/2" test joints. Test to 250 / 3500
psi. Test annular to 250 / 3500 psi with 3-1/2" test joint.
Annular preventer fail on high pressure test. Call for new GL
element. Test all choke, HCR, Kill valves. Wait on critical
18:00 - 00:00 ~ 6.001 WHSUR ~ P
5/27/2008 ~ 00:00 - 01:00 i 1.00 i W HSU R i P
01:00 - 06:00 ~ 5.00 ~ FISH ~ P
06:00 - 09:00 I 3.001 FISH I P
09:00 - 11:30 I 2.501 FISH I P
DECOMP PJSM and replace the GL Annular preventer element (with
new). Flange between HCR Kill and Kill manual failed, tighten
and tested ok. GL Annular tested with 3-1/2" test joint to 250 /
3500 psi. 2-7/8" X 5" VBR rams tested with 3-1/2" and 4-1/2"
test joints to 250 / 3500 psi
DECOMP Pull test plug and install short wear ring, blow down choke
lines and LD test joint.
DECOMP PU Wash over Mill 3.80" OD x 2.0" ID), 6 ea 2-7/8" DC, 11 ea
2-7/8" DP and jar, bumper sub, 2 ea boot baskets from pipe
shed. RIH on 8 ea 4-11/16" DC from derrick.
DECOMP RIH on 3-1/2" DP from Derrick. 90 stands in hole ~ 09:00.
BOPE drill with rig crew. Review responses and
responsibilities.
DECOMP Continue RIH w/ BHA # 23. 10:30 - 130 stands in the hole.
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION Page 18 of 20
Operations Summary Report
Legal Well
Common W
Event Nam
Contractor
Rig Name:
Date Name:
ell Name:
e:
Name:
From - To Z-03
Z-03
WORKO
NABOB
NABOB
Hours
VER
S ALAS
S 3S
Task
A DRILLING
I Code ~~
NPT
Spud Date: 9/1/1997
Start: 4/24/2008 End: 6/2/2008
I Rig Release: 6/2/2008
Rig Number:
I
Phase Description of Operations
5/27/2008 09:00 - 11:30 2.50 FISH P DECOMP Taaaed liner too at 9.520', PU Kelly.
11:30 - 17:30 6.00 FISH P DECOMP Establish parameters. PUW = 140K, SOW = 110K, ROTW =
125K, 3 bpm at 460 psi, 60 rpm at 8K torque off bottom, rotate
and wash down to tag fill at 9,596', Mill to 9,603', Torque _
8-10K, WOB = 0-8K. Torque and penetration droped off.
Consult with ADW engineer. Had 60K over pull with pumps off.
17:30 - 19:30 2.00 FISH P DECOMP Pump the Kelly and 2 joints out of the liner because with
pumps off the pipe became stuck when picking up. POH
above the liner to 9,512', i e is free. Observe well for 20 min.
ell stable with no flow.
19:30 - 00:00 4.50 FISH P DECOMP Pumped dry job, and POH from 9,512' to evaluate the Mill with
continuos hole fill. 118 stands out at 00:00 hrs.
5/28/2008 00:00 - 01:00 1.00 FISH P DECOMP Continue POH to 141 stands of 3-1/2" DP.
01:00 - 04:30 3.50 FISH P DECOMP Stand 4-3/4" DC in Derrick, LD BHA, Jars, 11 joints PAC DP, 6
ea 3-1/8" DC.
04:30 - 05:00 0.50 FISH P DECOMP Service boot basket. Boot basket is em t .
05:00 - 07:30 2.50 FISH P DECOMP Cut and Slip drill line. Contact intervention engineer and agree
to run the same mill once again, this time omitting the PAC
pipe for a more sturdy BHA.
07:30 - 08:30 1.00 FISH P DECOMP PU BHA #24: Mill shoe, 3-3/8" Drill Collars, Boot Baskets, Jars,
and Pump out sub.
08:30 - 16:45 8.25 FISH P DECOMP RIH w/ BHA #24 to the top of the liner at 9520' MD. No losses
to the formation. Entered liner without any problems. RIH to
16:45 - 00:00 7.25 FISH P DECOMP PUMU Kelly. Establish milling parameters.POW = 142K, SOW
= 113K, Free Rotating WT = 125K, Free spinning torque =
6,500 ft-Ibs at 60 RPM. Pump pressure was 700 psi at 3 BPM.
Sat 8k-Ibs. WOB at 9598' MD and milled easily to 9602' MD
with 7,000 ft-Ibs of torque while circulating at 3 BPM and 800
psi. Stopped milling at 9602' MD with 8k- Ibs WOB. Increase
WOB to 12k-Ibs. Began milling slowl from 9602' to 9604' with
7,000 ft-Ibs. of torque and a pump pressure of 900 psi at 3
BPM. Pump pressure increased to 1000 psi at 9604' Ma.
Pumped Hi-vis sweep.
5/29/2008 00:00 - 04:30 4.50 FISH P DECOMP Continue to Mill at 9 604' MD to 9 606' MD, had 35K over pull,
pipe is free, pumped Hi-vis sweeps.
04:30 - 05:00 0.50 FISH P DECOMP POH from 9,606' MD to top of liner at 9,505'. Well is stable.
05:00 - 14:00 9.00 FISH P DECOMP POH from 9,505' with continous hole fill, pipe pulling wet. Pump
dry job. Continue POH w/ BHA #24 while S/B DP. Losses are
~-
at - 1 BPM.
14:00 - 15:30 1.50 FISH P DECOMP UD BHA #24 and inspect mill. Mill exterior is completely worn.
Mill bottom is heavily worn. The inside fo the mill is completely
worn from the base up to 2' in. The tattletale pin was broken
and bent upward. The boot baskets were 1/4 of the way full of
metal shavings.
15:30 - 16:30 1.00 FISH P DECOMP Consult with town and decide to go for the prong. PUMU BHA
#25: Overshot and grapple with 7" casing scraper.
16:30 - 23:30 7.00 FISH P DECOMP RIH w/ BHA #25 to the top of the liner at 9520' MD
23:30 - 00:00 0.50 FISH P DECOMP RU to displace Well and take on 9 ppg Brine to Pits.
5/30/2008 00:00 - 02:30 2.50 FISH P DECOMP PJSM with crew and Vac truck drivers. Displaced with 9 ppg
Brine at 3 bpm / 660 psi, at 9,510' MD, pumped a total of 322
bbls, taking returns to the Tiger tank.
02:30 - 05:00 2.50 FISH P DECOMP RIH 2 stands from Derrick, PU Kelly and wash to engage Fish
Printed: 6/30/2008 9:25:56 AM
r ~ •
BP EXPLORATION Page 19 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABOBS ALAS KA DRILLING I Rig Release: 6/2/2008
Rig Name: NABOBS 3S Rig Number:
Date From - To ~ , Hours Task ,Code'.. NPT ~ Phase ~ Description of Operations
- - -
- --
- -
5/30/2008 02:30 - 05:00 2.50 FISH P DECOMP at 9,603' observed over pull. Monitor Weil for 20 min. Well is
stable.
05:00 - 06:00 1.00 FISH P DECOMP Set back Kelly, POH LD 3-1/2" DP and reciprocate 7" csg
scraper from 9,371' to 9,244', with continuous hole fill.
06:00 - 11:00 5.00 FISH P DECOMP SOH w/ BHA #25 and fish while UD DP into the Pipe Shed.
11:00 - 16:00 I 5.001 FISH I N
16:00 - 00:00 8.001 FISH P
5/31/2008 00:00 - 01:00 1.00 FISH P
01:00 - 03:30 2.50 FISH P
03:30 - 04:00 0.50 FISH P
04:00 - 05:00 1.00 FISH P
05:00 - 06:00 1.00 FISH P
06:00 - 08:00 2.00 BUNCO
08:00 - 14:30 6.50 BUNCO
14:30 - 16:00 1.50 BUNCO
16:00 - 00:00 8.00 BUNCO
6/1/2008 100:00 - 13:00 I 13.001 RU
13:00 - 15:00 I 2.001 RU
15:00 - 16:00 I 1.001 RNTBHC~ P
16:00 - 20:00 i 4.001 CHEM ~ P
20:00 - 22:30 I 2.501 RU
22:30 - 00:00 1.50 WHSUR P
6/2/2008 00:00 - 02:30 2.50 BOPSU P
DECOMP Dropped 1-joint of Drill Pipe from the Floor to the Pipe Shed.
Shut down operations. Discuss how incident happened and
how it can be prevented in the future.
DECOMP Continue POH w/ BHA #25 and UD DP into the Pipe Shed.
Filling hole with displacement. 0 Bbls/hr of losses to the
formation. 280 joints LD at 00:00 hrs.
DECOMP Continue POH LD 3-1/2" DP, 296 joints layed down.
DECOMP BO / LD BHA #25. No Fish recovered. Large deep scares on
out side of overshot. Service bootbaskets and recovered 2
cups of fine mill cutting.
DECOMP Clear Rig floor of Fishing tools.
DECOMP MU test joint and pull short bowl protector from tubing head.
DECOMP LD Kelly and swivel in to pipe shed.
RUNCMP R/U Stabbing Board.
RUNCMP Load and Strap 4-1/2" Vam Top Tubing and jewelry.
RUNCMP R/U Chrome Tubing handling tools on the Rig Floor.
RUNCMP PJSM. Run 4-1/2", 12.6#, 13CR, Vam Top completion: UMI
Oversho , - ipp e, a er - ac er, -Nipple, 9-GLMs,
X-Nipple, and Hanger. Use Jet Lube Seal Gaurd. All
connections below Packer are Baker Lok'd. M/U torque turn
tubing to optimum torque of 4,440 ft-Ibs. with Nabors casing
crew.
RUNCMP Continue to Run 4-1/2",12.6#, 13Cr, Vam Top tubing
completion assembly. Ran 130 joints at 05:30 hrs.
RUNCMP Ta to of Liner 21.5' in on Joint #220. UD joint #220, #219,
and #218. Top of liner at 9,508'. Space out so that the bottom
of the overshot is 3.5' above the liner. When the packer sets,
there should be 1' of stroke which will place the bottom of the
completion 2.5' above the liner. P/U space out pups
(9.86,9.84,7.56,3.82,2.10) and Joint #218.
TUBHGR P/U and M/U Tubing Hanger. M/U landing joint. Land Hanger.
P/U 100k-bs. S/O 95k-Ibs. RILDS. Clear floor of chrome
handling equipment.
CLEAN PJSM. Reverse circulate 195 Bbls of inhibited seawater at
36PM and 270 psi while taking returns to the tiger tank.
RUNCMP Dro ball and rod. Pressure u on tubin to 3 500 si for 30
minutes then bleed to 1,500 si. Pressure u IA and tested
3 500 si for 30 minutes. Bleed off tubin ressure and
observe DCK shear at 2 000 si. Pumped 1 BPM ~ 160 psi
down tubing with returns. Pumped 1 BPM ~ 170 psi into IA
with returns up the tubing. Witnessed by WSL, Tourpusher,
Backer Rep.
RUNCMP Set and Test TWC with FMC tech, 3,000 psi from above and
1.000 si from below for 10 min. Blow and R/D down lines.
RUNCMP Blow down lines, drain BOP stack, unhook turnbuckles, pull
flow riser, unhook koomey and Hi-pressure lines and N/D
Printed: 6/30/2008 9:25:56 AM
• •
BP EXPLORATION Page 20 of 20
Operations Summary Report
Legal Well Name: Z-03
Common Well Name: Z-03 Spud Date: 9/1/1997
Event Name: WORKOVER Start: 4/24/2008 End: 6/2/2008
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 6/2/2008
Rig Name: NABOBS 3S Rig Number:
'
Date From - To Hours Task Code NPT Phase
Description of Operations
6/2/2008 00:00 - 02:30 2.50 BOPSU P RUNCMP BOPE and place stack in cradle.
02:30 - 05:30 3.00 WHSUR P RUNCMP NU new Adapter Flange and Tree. Test hanger void to 5,000
psi for 30 minutes with FMC tech and WSL. Test Tree body
with diesel to 5,000 psi with no visable leaks.
05:30 - 06:00 0.50 WHSUR P RUNCMP PU / MU lubricator, Well tech pulled TWC
06:00 - 08:30 2.50 WHSUR P RUNCMP Pump 75 Bbls of Diesel down IA while taking returns to the
tiger tank. U-tube with Tubing for 1-hour.
08:30 - 10:00 1.50 WHSUR P RUNCMP Set BPV and test to 1000 psi from below with LRS.
10:00 - 12:30 2.50 WHSUR P RUNCMP UD Stabbing Board. Secure Tree and Cellar., Release rig at
1230- hrs.
Printed: 6/30/2008 9:25:56 AM
05/30/08
~ch~6~rger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well .Inh !t
...
1 nn rls wl.. n_a_
Z-03
11975773 ___- -___-- __--
SFRT ~ (~ ~_.~
05/20/08 ._.-
1 ........ vv
1
P2-32 12066522 MEM TEM SURVEY - ~ 05!19/08 1 1
18-13B 12021159 MEM PROD PROFILE - ~ ~ 05/18/08 1 1
Z-03 11975773 USIT - G~~ 05/19/08 1 1
W-29 11999017 INJECTION PROFILE 05/26/08 1 1
15-39A 11999018 PRODUCTION PROFILE b(p - c, 05/28/08 1 1
07-30A 11963095 SCMT - ~ 05/27/08 1 1
14-096 11982432 PROD PROFILE W/FSI - Q. v 05/27/08 1 1
A-34A 12057614 USIT - jp ' /(pGfZj~- 05/26/08 1 1
GNI-04 11824353 OH LDWG EDIT (DSI) V-t _ I ~, 11/07/07 1 1
_..__ .._...._.._~_~. _. ..~...... ... .............. ....v ..~. vnr~mu vnG vvr. GNVf1 I V.
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. --
Anchorage, Alaska 99508
Date Delivered: ~ - ~ lv!t~y
N0.4727
~~~~ TI'~ ~ ~ 208 Company: State of Alaska
zl v Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Alaska Data & Consulting Services
2525 Gambell Street, Suite 40
Anchorage, AK 99503-2 38 /
ATTN: Beth /'„' s`.-/
Received by: IJL/L "~
•
r
~J
05/30/08
U4~1~1~~G1-~r~
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
wpu .Inh a
~lNE~ JUN ~ .~ 2008
1 .... new.. ..+:....
NO.4727
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
ns.. n~ n_~_.. nn
Z-03 11975773 SFRT +- (~ 05/20/08 1 1
P2-32 12066522 MEM TEM SURVEY - ~ 05/19/08 1 1
18-138 12021159 MEM PROD PROFILE - J ~ 05/18/08 1 1
Z-03 11975773 USIT - ~~,3 05/19/08 1 1
W-29 11999017 INJECTION PROFILE d( 05/26/08 1 1
15-39A 11999018 PRODUCTION PROFILE - c, 05/28/08 1 1
07-30A 11963095 SCMT - ~ 05/27/08 1 1
14-096 11982432 PROD PROFILE W/FSI - 2, v 05/27/08 1 1
A-34A 12057614 USIT - /p~j' / G/~~- 05/26/08 1 1
GNI-04 11824353 OH LDWG EDIT (DSI) V-t _ I 4 11/07/07 1 1
rLGN~IG N4 NYV YYLCYVG fl Gtr Gir' 1 or .71<7~Y IIYl7 NIVU r1C 1 UrS1Y11Y1a VIVG \.VYT CHI.n 1 V:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. -
Anchorage, Alaska 99508
~, ,.
Date Delivered: ~ 9 ~('rg
Alaska Data & Consulting Services
2525 Gambell Street, Suite 40
Anchorage, AK 99503-2 38 /
ATTN: Beth /'„ C/
ReceivedReceived by: l//,
•
•
STATE OF ALASKA
11/14/07 Of ~ AND GAS CONSERVATION COMMISSION
BOPS Test Report
Submit to:
Contractor: Nabors Rig No.: 3S DATE: 5/26/2008
Rig Rep.: J.Henson/R.Bjofius Rig Phone: 659-4487 Rig Fax: 659- 4486
Operator: BP Op. Phone: 659- 4485 Op. Fax: 659-4628
Rep.: J.Menke/D.Rhodes
Field/Unit & Well No.: GPB Z-03 PTD # 1971310 ~~~ {
Operation: Drlg: Workover: X Explor.:
Test: Initial: Weekly: X Bi-Weekly
Test Pressure: Rams: 250/3500 Annular: 250/3500 Valves: 250/3500
TEST DATA
MISC. INSPECTIONS:
Test Result Test ResuR
Location Gen.: P Well Sign P
Housekeeping: P Drl. Rig P
PTD On Location P Hazard Sec. P
Standing Order Posted P
BOP STACK:
Quantity Size Test ResuR
Annular Preventer 1 i 3 5/8 5000 FP
Pipe Rams 1 2 7/8" x 5" P
Lower Pipe Rams
Blind Rams 1 Blind P
Choke Ln. Valves 1 3 118" 5000 P
HCR Valves 2 3 1/8" 5000 P
Kill Line Valves 1 2 1/16" 5000 P
Check Valve 0 NA
MUD SYSTEM: Visual Test Alarm Test
Trip Tank P P
Pit Level Indicators P P
Flow Indicator P P
Meth Gas Detector P P
H2S Gas Detector P P
Test Results
FLOOR SAFETY VALVES:
Quantity Test R
Upper Kelly 1 P
Lower Kelty 1 P
Ball Type 1 P
Inside BOP 1 P
CHOKE MANIFOLD:
Quantity Test Result
No. Valves 13 P
Manual Chokes 1 P
Hydraulic Chokes 1 P
ACCUMULATOR SYSTEM:
Time/Pressure Test Result
System Pressure 3000 P
Pressure After Closure 1600 P
200 psi Attained 25 sec. P
Full Pressure Attained 2 min 4 sec P
Blind Switch Covers: All stations P
Nitgn. Bottles (avg): 4~ 2000 PSI
Number of Failures: 2 Test Time: 14 Hours Components tested ALL
Repair or replacement of equipment will be made within days. Notify the North Slope
Inspector 659-3607, follow with written confirmation to Superviser at:
Remarks: Annular failed changed out aackina unit test U 250 8~ 3500 w(ok) Blind ram door seal failed changed
out test to 250 8~ 3500 psi tok)
24 HOUR NOTICE GIVEN
YES X NO
Date 05124/08 Time 8:00
Test start 10::00 AM Finish
BOP Test (for rigs) ~ ~ ~~`~ ~ ~ ZQ~~
BFL 11/14/07
ived By Lou Grimaldi
Witness J.Menke / J.Henson
Nabors 3S BOP Test GPB Z-03 5-26-08.x1s
• •
STATE OF ALASKA
11/14/07 OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
submit to:
Contractor: Nabors Rig No.: 3S DATE: 5/11/2008
Rig Rep.: J. Greco/ J. Fritts Rig Phone: 659-4487 Rig Fax: 659- 4486
Operator: BP Op. Phone: 659- 4485 Op. Fax: 659-4628
Rep.: W.Hoffman/B. Burson
Vry,y
Field/Unit & Weli No.: GPB Z-03 PTD # 1971310 ~'T
Operafion: Drlg: Workover: X Exptor.:
Test: Initial: Weekly: X Bi-Weekly
Test Pressure: Rams: 250/3500 Annular: 250/3500 Valves: 250/3500
TEST DATA
MISC. INSPECTIONS: FLOOR SAFETY VALVES:
Test Result Test Result Quantity Test Result
Location Gen.: P Well Sign P Upper Kelly 1 P
Housekeeping: P Drl. Rig P Lower Kelly 1 P
PTD On Location P Hazard Sec. P Ball Type 1 P
Standing Order Posted P Inside BOP 1 P
BOP STACK:
Quantity Size Test Result CHOKE MANIFOLD:
Annular Preventer 1 13 5/8 5000 P Quantify Test Result
Pipe Rams 1 2 7/8" x 5" P No. Valves 13 P
Lower Pipe Rams Manual Chokes 1 P
Blind Rams 1 Blind P HydrauNc Chokes 1 P
Choke Ln. Valves 1 3 1/8" 5000 P
HCR Valves 2 3 1/8" 5000 P ACCUMULATOR SYSTEM:
Kill Line Valves 1 2 1116" 5000 P Time/Pressure Test Result
Check Valve 0 NA System Pressure 3050 P
Pressure After Closure 1500 P
MUD SYSTEM: Visual Test Alarm Test 200 psi Attained 33sec P
Trip Tank P P Full Pressure Attained 2 min 20 sec P
Pit Level Indicators P P Blind Switch Covers: All stations P
Flow Indicator P P Nitgn. Bottles (avg): 4@1925
Meth Gas Detector P P
H2S Gas Detector P P
Test Results
Number of Failures: 0 Test Time: 5.0 Hours Components tested ALL
Repair or replacement of equipment will be made within days. Notify the North Slope
Inspector 659-3607, follow with written confirmation to Superviser at:
Remarks: Tested w/3 1 /2" 8~ 4 1 /2" test its /tested upper and lower ketlv valves
24 HOUR NOTICE GIVEN
YES X NO
Waived By
Date 05110/08 Time 1130 hrs
Witness J.Jones/ Fritts! Burson
Test start 1900 hrs Finish 0000 hrs
BOP Test (for rigs)
BFL 11/14/07
5~~~ MAY ~ ~ 2008
Nabors 3S BOP Test GPB Z-03 5-11-08.x1s
STATE OF ALASKA
11/14/07 OIL AND GAS CONSERVATION COMMISSION
ROPE Test Report
Submit to:
Contractor: Nabors Rig No.: 3S DATE: 4/27/2008
__
Rig Rep.: G.SweattlR.Bjorh~u Rig Phone: 65g-4487 Rig Fax: 659- 4486
Operator: BP Op. Phone: 659- 4485 Op. Fax: 659-4628
Rep.: J.Menke/D.Rhodes
FieidlUnit 8~ Weil No.: GPB Z-03 PTD # 197'f310
Operation: Drtg: Woricover: X Exptor.:
Test: initial: X Weekly: $"t-Weeldy
Test Pressure: Rams: 250/35QEI Anrx~ar: 250/350f3 Vakres: 250/3500
MISC. INSPECTIONS:
Test Result Test Result
Location Gen.: P WeH Sign P
Housekeeping: P Dri, Rig P
PTD On Location P Hazard Sec. P
Standing Order Posted P
BOP STACK:
Quantrty Size Test Result
Annular Preventer 1 i 3 518 50(313 P
Pipe Rams 1 2 718" X 5" P
Lower Pipe Rams
Blind Rams 1 t~rxf P
Choke Ln. Valves 1 3 '1!8" P
HGR Valves 2 3 '118" 5€~4 _ P
Kitt Line Valves 1 2 '1116" 5004 P
Check Valve 0 NA
FLOOR SAFETY VALVES:
Quantity Test RE
Upper Kelly 1 NT
Lower KeNy 1 NT
Baif Type 1 P
Inside BOP 1 P
CHOKE MANIFOLD:
Quantity Test Result
No. Naives i 3 P
Manual Chokes 1 P
Hy Chokes t P
ACCt)IdtIJLATOit SYSTEM:
TirnelPressure
System Pressure 3100
Pressure After Close _ 1600
Ml7D SYSTEM: Visual Test Alarm Test 200 psi Attained 20sec
Trip Tank P P Fug Pressure Attar t mkt 35 sec
Pit Level Indicators P P t3~d Swit€~ Govern:
Flow Indicator P P Niter. Bottles (avg~: 4~t75#} _
Meth Gas Detector P P
H2S Gas Defector P P
Test Results
Number of Failwes: O Test Time: 4_5 Hours:
Repair or rep cement of ec~tipmerst mitt be made within days..
Inspector 659-36t33T, faxes with written confirmation to Supervises at:
Remarks: Used two electric Humors on the Aecum. Build up.
24 HOUR NOTICE
YES X NO
Date 04123/08 Time
Finish
BOP Test (for rigs)
BFL 11/14/07 ,~~ qp~ ~ ~ 2D08
0701} hrs
Test Result
P
P
P
P
Comt~anents tested ALL
-- Notify ttie North Slope
Witness G.SweattlJ.Menke
Nabors 3S BOP Test GPB Z-03 4-27-08.x1s
---~ a g;~ __~ ~ ~~
~ ~ ~ i ~~ ~ ~ ~ SARAH PAL/N, GOVERNOR
L1•i4[a-7~ OI~ ~ ~ 333 W. 7th AVENUE, SUITE 100
CO1~SI' RQATIOl~ CO1rII~'IISSIOI~T ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
David Reem
Engineering Team Leader
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612 ~ 3 ~
~~ .
Re: Prudhoe Bay Field, Prudhoe Bay Pool, Z-03
Sundry Number: 308-099
~~N~ APR ~ ~ 200
Dear Mr. Reem:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants .for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Daniel T. Seamount, Jr.
Chair
DATED this 2nd day of April, 2008
Encl.
- Q
' ~ q~ STATE OF ALASKA ~l(~ ¢~ ~ 1~~~~~~®
~~'U ALASKA OIL AND GAS CONSERVATION COMMISSION MAR 2 7
APPLICATION FOR SUNDRY APPROVAL ~~
20 AAC 25.280 ~I~cka Oil 8 G2lS COtt5.
1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Ext~Of~ ~
Iter Casing ~ ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
^ Change Approved Program ~ II Tubin ^ Perforate New Pool ^ Waiver ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ®Development ^ Exploratory 197-131
3. Address: ^ Service ^ Stratigraphic 6. API Number: .
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22787-00-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: PBU Z-03
Spacing Exception Required? ^ Yes ®No
9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): -
ADL 028262. a 83.75' ~ Prudhoe Bay Field !Prudhoe Bay Pool
12. PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
10187 ~ 9210- 10101 9124 9500 None
sin Len th Size MD TVD Burst Colla se
Structural
nductor 80' 2 80' 80' 1490 470
Surface 3072' 9-5/8" 3104' 3080' 5750 3090
Intermediate 9670' 7" 9700' 8724' 7240 5410
Pr ion
Liner 679' 4-1/2" 9508' - 10187' 8533' - 9210' 8430 7500
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
9844' - 9982' 8868' - 9005' 3-1/2", 9.3# L-80 9532'
Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV MD (ft): 9475'
13. Attachments: 14. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Exploratory ®Development ^ Service
^ Detailed Operations Program
15. Estimated Date for 16. Well Status after proposed work:
Commencin O erations: April 17, 2008 ®Oil ^ Gas ^ Plugged ^ Abandoned
17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Frank Roach, 564-4373
Printed Name vid Reem Title Engineering Team Leader
~ Prepared By Name/Number:
Signature ~ Phone 564-5743 Date .S'f Terrie Hubble, 564-4628
Commission Use Onl
Sundry Number:
Conditions of approval: Notify Commission so that a representative may witness
^ Plug Integrity ,BOP Test ^ Mechanical Integrity Test ^ Location Clearance
Other: ~~~~ f~~c ~~~~ .~
Subsequent Form Required: ~ L a
'
APPROVED BY Z y
A roved B COMMISSIONER THE COM ISSI N Date Q
Form 10-403 Revised'p6`/2006 Submit In Duplicate
ORIGINAL ~~'~~ `~ ~ ~
by
cr,y
Z-03 Rig Workover
Scope of Work: Expense RWO: Pull 3-'/z" completion, mill and retrieve Baker S-3 packer and tailpipe,
run 2'/" x 3-'/z" tapered chrome perforated scab liner with Swell Packers and log in place, run 4-'h" 13Cr-
80 tubing with Baker S-3 packer set at9300' MD.
MASP: 2855 psi
Well Type: Ivishak Producer
Estimated Start Date: April 17, 2008
Production Engineer: Dan Robertson
Intervention Engineer: Frank Roach
Pre-riq prep work:
O 1 Check the tubing hanger lock down screws for free movement. Completely back out and check
each lock down screw for breakage (check one at a time). Well is secured at this time with PX
lu 10/05/2007 set . PPPOT-T & IC.
S 2 Drift tubin for 'et cutter to 9500' MD. **NOTE: Potential Parted Tubin @ 7750'**
E 3 Power Jet cut 3-'/z" tubing ~ 9472' MD (Ref 09/27/1997 tubing summary). Jet cut desired to
be in the bottom 1' of the first u ~oint above acker.
F 4 Circulate well with seawater and cap with diesel thru the cut. CMIT-TxIA to 3500 psi. MITOA
to 2000 si. Bleed WHPs to 0 si.
O 5 Set a BPV in the tubin han er.
O 6 Remove the wellhouse & flow line. Level the ad as needed for the ri .
Proposed Procedure
1. MIRU workover rig. ND tree. NU and test BOPE pipe rams to 3500 psi. Test annular preventer to
3500 psi. Circulate out freeze protection fluid and circulate well to clean seawater through the cut.
2. Retrieve 3-'/z" tubing string down to the packer.
3. Change out 7" casing packoff and test to 4300 psi.
4. Mill and retrieve Baker S-3 packer at 9475' MD.
5. Run 2-'/" x 3-'h" tapered chrome perforated scab liner with swell packers to cover 4-1/z" production
liner. (Top of scab liner inside 7" casing at 9450'). Spot liner per drillpipe measurement. Confirm
depths with GR log correlation and adjust as needed.
6. Run 4-'/z" 13Cr-80 tubing with Baker S-3 packer set at 9300' MD.
7. Displace the IA to packer fluid and set the packer.
8. Test tubing and IA to 3500 psi. Freeze protect to 2000' MD.
9. Set BPV. ND BOPE. NU and test tree. RDMO.
rTREE= 4-1/16"CAMERON
WELLHEAD = 11" FMC
ACTUATO = BAK
KB. ELEV = 83.75'
BF. ELEV = 54.05'
KOP = 2573'
Max Angle = 35 @ 5780'
Datum MD = 9860'
Datum TVD = 8800' SS
9-5/8" CSG, 40#, L-80 BTC, ID = 8.681"
17" MARKERJOINT I
Minimum ID = 2.750" @ 2230'
3-1 /2" OTIS SSSV NIPPLE
TOP OF4-1/2" LNR
3-1/2" TBG, 9.2#, L-80 TDS, .0087 bpf,
ID = 2.867" (PUP JOINTS)
7" CSG, 26#, L-80, .0383 bpf, ID = 6.276"
PERFORATION SUMMARY
REF LOG: BHCS ON 09/24/97
ANGLE AT TOP PERF: 4 @ 9844'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
2-1/2" 6 9844 - 9857 C 10/02/03
2-112" 6 9864 - 9882 C 10/02/03
2-1/2" 6 9888 - 9896 C 10/02/03
2-1/2" 6 9900 - 9906 C 10/02/03
2-1/2" 8 9910 - 9925 C 07/19/98
2-1/2" 4 9928 - 9940 C 08/06/99
2-1 /2" 8 9945 - 9982 C 07/30/98
PBTD
4-1/2" LNR, 12.6#, L-80 MOD-BUTT,
.0152 bpf, ID = 3.953"
Z ~O ~ SAFETY NOTES: **3-1/2" PUP JOINTS HAVE
SMALLER ID (2.867"} THAN 3-1 f2" TBG (2.992")**
2230' 3-1/2" HES SSSV LAND NIP, ID = 2.75"
GAS UFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
6 3070 3049 21 CAM DMY RK 0 09/30/07
5 5107 4774 33 CAM DMY RK 0 09/30/07
4 6607 6020 32 CAM DMY RK 0 09/30/07
3 7768 6993 34 CAM DMY RK 0 09/30/07
2 8864 7917 29 CAM DMY RK 0 09/30/07
1 9399 8425 6 CAM DMY RK 0 09/14/03
9462' 3-1/2" HES X NIP, ID = 2.750"
9473' 3-1 /2" X 4-1(2" XO, ID = 2.938"
9475' 7" x 4-1/2" BKR S-3 PKR, ID = 3.875"
9478' 4-1/2" X 3-1/2" XO, ID = 2.938"
9500' 3-1/2" HES X NIP, ID = 2.750"
9500' 3-1/2" PX PLUG (10/02/07)CA
950$' 7" x 5" ZXP LTP w / HMC LNR HGR, ID = 4.375"
9520' 3-1/2" HES X NIP, ID = 2.750"
9528' 5" X 4-1/2" XO, ID = 3.958"
9532' 3-1/2" WLEG, ID = 2.920"
9527' ELMD TT LOGGED ?
DATE REV BY COMMENTS DATE REV BY COMMENTS
09128/97 JLM ORIGINAL COMPLETION
09/14/03 JCMITLP GLV GO
05/18/05 WRR/PJC ELMD CORRECTION
08/26/07 SV PERFORATIONS (10/02/03)
10/01/07 JPK/PJC DRAWING CORRECTIONS
01/17!08 JLJ/PJC SET PX PLUG (10/02/07)
PRUDHOE BAY UNff
WELL: Z-03
PERMff No: 1971310
API No: 50-029-22787-00
SEC 19, T11 N, R12E, 976' SNL & 1427 EWL
BP 6cploration (Alaska)
TREE= 4-1/16" CAMERON
W~1_LHEAD = 11" FMC
ACTUATOR =
~ - BAKER
KB. EV = 83.75'
BF. ELEV = 54.05'
KOP = 2573'
Max Angle = 35 @ 5780'
Datum MD = 9860'
Datum TV D = 8800' SS
9-5/8" CSG, 40#, L-80 BTC, ID = 8.681" i
7" MA RKER JOINT
Minimum ID = 2.750" @ 2230'
4-1/2" TBG, 12.6#, 13Cr-80 Vam Top, .0152 bpf, -
TOP OF 4-1/2" LNR
PERFORATION SUMMARY
REF LOG: BRCS ON 09/24/97
ANGLE AT TOP PERF: 4 @ 9844'
Note: Refer to Production DB for historical pert data
DATA
7" CSG, 26#, L-80, .0383 bpf, ID = 6.276" --{
3-1/2" TBG, 9.2#, 13Cr-80 STL, .0087 bpf -
3-1/2" PERFORATED TBG, 9.2#, 13Cr-80 -
STL, .0087 bpf
Z-03 SAFETY NOTES:
PROPOSED
4-1/2" HES X NIP, ID = 3.813"
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
8
7
6
5
4
3
2
1
O
O
O ~
O
O
O
2-718" PERFORATED TBG, 6.5#, 13G-80 -
VamTop, .0058 bpf
2-7/8" PERFORATED TBG, 6.5#, 13Cr-80 -
VamTop, .0058 bpf
2-7/8" TBG, 6.5#, 13Cr-80 Vam Top, .0058 bpf -
PBTD -
4-1/2" LNR, 12.6#, L-80 MOD-BUTT,
.0152 bpf, ID = 3.953"
~~4-1/2" HES X NIP, ID = 3.813"
7" x 4-1/2" BKR S-3 PKR, ID = 3.875"
4-1/2" HES X NIP,ID = 3.813"
4-1/2" HES XN NIP, ID = 3.725"
WLEG
17" x 4-1/2" ZXP LTP w / HMC LNR HGR. ID = 4.375" 1
5" x 3-1/2" X/O
3-1/2" x 2-7l8" X/O
I HES SWELL PACKER I
HES
DATE REV BY COMMENTS DATE REV BY COMMENTS
09/28/97 JLM ORIGINAL COMPLETION
09/14/03 JCM/TLP GLV GO
05/18/05 WRR/PJC ELMD CORRECTION
08/26/07 SV PERFORATIONS (10/02/03)
10/01/07 JPK/PJC DRAWING CORRECTIONS
01!17/08 JLJ/PJC S~ PX PLUG (10/02/07)
PRUDHOE BAY UNIT
WELL: Z-03
PERMfT No: 1971310
API No: 50-029-22787-00
SEC 19, T11 N, R12E, 976' SNL 8~ 1427' EWL
BP Exploration (Alaska)
O
O
O
O
Schlumbørger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
W-19AL 1
17-19A
V-04
Z-21A
Z-03
05-38
Y-29A
B-16
Z-22B
Z-14B
P2-45A
17-09
F-33
4-08/P-27
3-17F/K-30
MPB-50
S-125
Job#
11890312
11855512
11855513
11594526
11767142
11686787
11855514
11676969
11594525
11849935
11594529
11846820
11661176
11630506
11649961
40011604
40015467
5~ED OC1 :1 1 2007
Loa Descri tion
SBHP & TEMP ,:)():4 - -:::¡-:-.<,
SBHP SURVEY I ~ '"). ~ h~ ~
SBHP SURVEY ~)ùCo - 1~G-1
SBHP SURVEY ::J/'Jt) -J()/
LDL 'C::;I"'+-_~ I
LDL ¡C1r- - J'k~
DDL to¡ G? - C'A (
PRODUCTION PROFILE f~ -()/:)S
SBHP SURVEY - 60~ -¡;; ,^,4t,
SBHP SURVEY ::;/')(o-f'A<:::
SBHP SURVEY / C; q -I'?/t../
LDL /111- 6CJ ()
MEMORY SBHPS I t:')ú, - 003
LDL I) 'Ie 115 "':}- - h{)'7(
MCNL .;)0"3 -.::J./f." -tt }iÇ"(,,¡lJ
OH MWD/LWD EDITi)1(\ :::JH-J- x:::J 151r.f3.
OH MWD/LWD EDIT ~D~-o'Í53 tt. ,S"'t" ~
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Date
09/29/07
09/26/07
09/27/07
10/07/07
10/01/07
09/27/07
09/28/07
10/12/07
10/06/07
10/02/07
10/16/07
10/19/07
10/19/07
10/04/07
04/17/07
02/27/05
07/14/07
NO. 4464
Company: State of Alaska
Alaska Oil & Gas Cons Gomm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P.Bay, Endicott, Aurora, Milne Pt., pt. Mac
BL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
Color
CD
1
1
1
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Aoch"",o, AK "50~~8
ATTN: Beth £
Received by: C¡ ^---
10/25/07
.
.
Z-03 (PTD #1971310) UNDER EVALUATION - Sustained Casing Pressure on IA
Page 1 of 1
Regg, James B (DOA)
NSU, ADW Well Integrity Engineer [NSUADWWelllntegrityEngineer@BP.com]
Wednesday, September 12, 20076:42 AM
Regg, James B (DOA); Maunder, Thomas E (DOA); Fleckenstein, Robert J (DOA); Rossberg, R Steven;
Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL;
GPB, GC2 Wellpad Lead; GPB, Optimization Engr; GPB, Wells Opt Eng; GPB, Prod Controllers; Robertson,
Daniel B (Alaska); NSU, ADW WL & Completion Supervisor
Cc: Roschinger, Torin T.; Holt, Ryan P (ASRC)
Subject: Z-03 (PTD #1971310) UNDER EVALUATION - Sustained Casing Pressure on IA
Attachments: Z-03.pdf
From:
0f111?k/D7
Sent:
To:
All,
Well Z-03 (PTD #1971310) has been found to have sustained casing pressure on the IA. The wellhead pressures were
2600/2600/440 psi on 09/09/07. A subsequent TIFL failed later on 09/12/07. The well has been classified as Under Evaluation
and may be produced under a 28-day clock.
The plan forward for this well is as follows:
1. D: TIFL - FAILED
2. APE: Eval DGL V design
3. S: Set DGLVs
4. F: MIT-IA to 3000 psi
J4 ::- ¿'-¿¡<Dr:> " ~ 35 ~ t:¡' 'i) !vULt?
úÌé- fv c9 ~~. ¡cr
CfJ 41 :z-.
A wellbore schematic has been included for reference:
«Z-03.pdf»
Please call if you have any questions or concerns.
Thank you,
Paul Austin for Anna Dube
Well Integrity Coordinator
GPB Wells Group
Phone: (907) 659-5102
Pager: (907) 659-5100 x1154
9/25/2007
TREE = 4-1/2" CAMERON
WELLHEAD"
ACTUA TOR =
KB. ELEV =
BF. ELEV "
KOP=
Max Angle =
Datum MD "
Datum 1VD =
Z-03
I SAFETY NOTES:
I PBTD
I 2230' H3-112" HES SSSV LAND NIP, 10 = 2.75" I
I
.
GAS LIFT MANDRELS
µ ST MD 1VO DEV !yPE VLV LATCH PORT DATE
3104' L 6 3070 2965 23 CAM DOME RK 16 09/14/03
5 5107 4689 33 CAM DOME RK 16 09/14/03
4 6607 5936 33 CAM DOME RK 16 ?
U 3 7768 6909 34 CAM DOME RK 16 09/14/03
2 8864 7833 30 CAM S/O RK 20 ?
2230' 1 9399 8341 6 CAM DMY RK 0 09/14/03
LE
I I 9462' H 3-1/2" HES X NIP, ID = 2.750" I
:g ¿S 9475' 1--17" x 3-1/2" BKR S-3 PKR, ID - 3.875" I
I I 9500' H 3-1/2" HES X NIP, ID = 2.750" I
I 9508' I
I 9520' 1--1 3-1/2" HES X NIP, 10= 2.750" I
I
" I 9532' 1/ 9532' 1--13-1/2" WLEG I
I
I 9527' H ELMDTTI
" I 9700' ~ ...
0
RY
24/97
9844'
storical perf data
n/Sqz DATE
0 10/02103
0 10/02/03
0 10/02/03
0 10/02/03
0 07/19/98
0 08/06/99
0 07/30/98
I 10101' I x
I xx .x
" 10187' I
I
9-5/8" CSG, 47#, L-80, 10 = 8.681" I
Minimum ID = 2.750" @
3-1/2" OTIS SSSV NIPP
I TOP OF 4-112" LNR
13-1/2" TBG, 9.2#, L-80, .0087 bpf, ID" 2.992
7" CSG, 26#, L-80, .0383 bpf, ID = 6.276
PERFORA TION SUMMA
REF LOG: SHCS ON 09/
ANGLEAT TOP PERF: 4@
Note: Refer to Production DB for hi
SIZE SPF INTERVAL Op
2-112" 6 9844 - 9857
2-1/2" 6 9864 - 9882
2-1/2" 6 9888 - 9896
2-1/2" 6 9900 - 9906
2-1/2" 8 9910 - 9925
2-1/2" 4 9928 - 9940
2-1/2" 8 9945 - 9982
14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID" 3.953
DATE
09128197
OS/28/01
09/14/03
05/18/05
08/26/07
REV BY COMMENTS
JLM ORIGINAL COMPLETION
RNlTP CORRECTIONS
JCMlTLP GL V C/O
WRRlPJC ELMO CORRECTION
SV PERFORA TIONS (10102/03)
DATE
REV BY
COMMENTS
PRUDHOE BA Y UNrr
WELL: Z-03
PERMrr No: "1971310
API No: 50-029-22787-00
SEC 19, T11N, R12E, 976' SNL & 1427' EWL
BP Exploration (Alaska)
"
Jql-/31
~ '
¿Wk,
-œ'f'
...-
.-;.
, , ,
,J,:, ,
..' ,.,
, "'-0"
" " \
-'.." '
Z-O3.MWD GR/ROPE
DATA RE-PROCESSING
Originally processed: October, 1997
Problem: ROPE data was not depth shifted along with the GR (12'-13' offset).
Final data not presentd in LDWG format.
Final depth-corrected prints were never created.
Re-Processed: December, 2003
Solution: GR depth shifts applied to ROPE data (GR and ROPE data now on depth)
, Final data is now presented in LDWG format.
Final depth-corrected presentations created.
When this data was originally processed in 1997, the ROPE data was not depth shifted
along with the GR data (The baseline curve is the Schlumberger GRBCS of 20-Sep-
1997) . The GR and ROPE data were then distributed, and a 12' -13' offset was observed
between the GR and ROPE data. The GR depth shifts have now been applied to the
ROPE data, and the GRMWD and ROP.MWD data are now on depth with one another.
The data is now presented in LDWG format as well.
Additionally, final depth-corrected prints were never created or distributed. Digital
displays (.PDS files) have now beencreatecland are included on this CD. Hard-copy
prints have also been distributed as per LDWG guidelines.
Please let me know if you have any questions or concerns about this data.
Thank you,
Kurt Cooney
Schlumberger (SIS)
Data Management Engineer
(907)-273-1772
cooney l@slb.com
RECEIVED
MAR 1 2 2004
,Ajaska Oil & Gas Cons. CoôIntasi\)1'ì
,t.nçrøáge
~-
12/31/03
Schlumberger
NO. 3087
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Well
Job#
Log Description
Date
Blueline
Color
Prints
CD
H-17A \,,-\-j'IF.;:::> 10558569 MCNL 08/12/03 1 1 J;JLLC)~
K-03A \ '-I '- - é:C! ~ 10560252 SCMT 04/25/03 1
D.S. 07-32A \ c,;¡Ci ~ ðG59 10564482 SCMT 06/10/03 1
D.S. 07-08A)<- -~q 1-1 10559786 SCMT 05/28/03 1
Z-03'\. l'-i '1- ::<;1 40001315 MWDGRIREPROCESSED) OQ/20/97 1 1;..JJ...Jb;;:¡-
Z-03 '\. 40001315 MWD GR MD C' ..'~ - . 1
Z-03/ 40001315 MWD GR TVD o¡".æ':7 -I. 1 "':" .
D.S.15-28A .-::}r"\~-,~ ... 10715362 MEM PPROF & IPROF 11/21'~:' i 1
,
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage. Alaska 99508
RECEIVED
Schlumberger GeoQuest
3940 Arctic Blvd. Suite 300
Anchorage. AK 99503-5711
ATTN: Beth
..' ,,-- -i <7 "!'I 'I 4
~' ~.: ¡ QC...Ll'UL~
Received ~f::\ \ ~: ,~\. (. ~-'\ e-íYì
Date Delivered.
,!.,<:¡,..,""j:~ ~...""'n,..~ t"^mm~
,"<,;;,.. '~'".. ..\l..ä::¡I.."..,/!S<"^,, , ,.I¡)ìJ.!.J!,<
f')r:"Io¡.~í'~O
..,.,!~o..,,¡;¡~...
~~~,\~
'I.
STATE OF ALASKA RECEIVE:[)
ALASKA OIL AND GAS CONSERVATION COMMISSION rES 0 3 2004
REPORT OF SUNDRY WELL OPERATIONs ",
r ' .... L" .,..
I~... \J- ',~~I 1\"
1. Operations Performed:
Abandon D
Alter Casing 0
Change Approved Program 0
2. Operator
SuspendD
Repair WellO
Pull Tubing 0
Operation ShutdownD
Plug PerforationsD
Perforate New Pool D
4. Current Well Class:
Perforate ŒI Waivé\iiCJ10rage
Stimulate 0 Time ExtensionD
Re-enter Suspended WellD
5. Permit to Drill Number:
197-1310
OtherD
Name:
BP Exploration (Alaska), Inc.
83.75
8. Property Designation:
ADL-0028262
11. Present Well Condition Summary:
Development I]]
Stratigraphic D
9. Well Name and Number:
Z-03
10. Field/Pool(s):
Prudhoe Bay Field / Prudhoe Oil Pool
Exploratory 0
Service 0
6. API Number
50-029-22787-00-00
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
Total Depth
measured 10187 feet
true vertical 9210.0 feet
Plugs (measured)
Junk (measured)
None
Effective Depth
measured 10101 feet
None
true vertical 9124.2 feet
Casing Length Size MD TVD Burst Collapse
Conductor 80 20" 91.5# H-40 33 113 33.0 - 113.0 1490 470
Liner 679 4-1/2" 12.6# L-80 9508 - 10187 8533.0 - 9210.0 8430 7500
Production 9670 7" 26# L-80 30 - 9700 30.0 - 8724.3 7240 5410
Surface 3072 9-5/8" 47# L-80 32 - 3104 32.0 - 3079.9 6870 4760
Perforation deDth:
Measured depth: 9844 - 9857,9864 - 9882,9888 - 9896,9900 - 9906,9910 - 9925,9928 - 9940,9945 - 9962,9962 - 9965,9965 - 9982
True vertical depth: 8867.82 - 8880.78,8887.76 - 8905.71,8911.69 - 8919.67,8923.66 - 8929.64,8933.63 - 8948.6,8951.59 - 8963.56
8968.55 - 8985.51, 8985.51 - 8988.5, 8988.5 - 9005.46
Tubing ( size, grade, and measured depth): 3-1/2" 9.3# L-80 @ 27
9532
Packers & SSSV (type & measured depth): 3-1/2" Baker 5-3 Packer
5" Baker ZXP Liner Top Packer
@
@
9475
9508
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13
Prior to well operation:
Subsequent to operation:
Oil-Bbl Gas-Met Water-Bbl Casino Pressure Tubing Pressure
214 0.18 838 1750 277
196 0.17 755 1740 328
Recresentative Dailv Averaae Production or Iniection Data
14. Attachments:
15. Well Class after proposed work:
ExploratoryD
Develop"mentŒ]
ServiceD
Copies of Logs and Surveys run-
16. Well Status after proposed work: Operational Shutdown D
Oil I]] GasO WAG 0 GINJO WINJD WDSPLO
Prepared by Garry Catron (907) 564-4657.
Sundry Number or N/A if C.O. Exempt:
N/A
Daily Report of Well Operations" !
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Garry Catron
Printed Name Garry Catron
13ti
Title
Production Technical Assistant
Signature
Phone 564-4657
Date
1/30/04
"~8fl
ÆÐ@4
ORIGINAL
~Bfl
fEB 0
2mll1
Form 10-404 Revised 12/2003
8{;t\l\~~~E["" rE~ 1 B 200¡~
">
Z-03
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
10102/03 DRIFTED WI 2.67in SWEDGE 2.5in DUMMY GUN & S. BAILER. (STRAIGHT) CLEARED
TIGHT SPOT FROM 77301 . 7780' SLM. T.D @ 99941 SLM. S. BAILER (EMPTY)
10102/03 Perforate 98441.985T 6 SPF, 98641.98821 6 SPF, 9888'.98961 6 SPF, 99001.99061 6 SPF
FLUIDS PUMPED
88LS
: TOTAL
No Fluids Pumped
0
Page 1
, ...
TRæ = 4-112" CAtvERON
WELL I-EA D = FMC
AC1UATOR= BA KER
KB. ELB/ = 83.75'
BF. ELB/ = 54.05'
KOP= 2573'
Max Angle = 35 @ 5780'
Datum MD = 9860'
Datum lV D = 8BOO'SS
Z-03
9-518" CSG, 47#, L-BO, Ð = 8.681"
Minimum ID = 2.750" @ 2230'
3-1/2" OTIS SSSV NIPPLE
TOP OF 4-112" LNR
3-1/2"TBG, 9.2#, L-BO, .0087 bpf, Ð =2.992"
7" CSG, 26#, L-80, .0383 bpf, Ð = 6.276"
ÆRFORA TION SUMMARY
RB= LOG: BI-CS ON 09/24/97
ANGLE AT TOP PERF: 4 @ 9910'
Note: Refer to Production DB for historcal perf data
SIZE SPF INTER\! AL OpnlSqz DATE
2-1/2" 8 9910 - 9925 0 07/19/98
2-1/2" 4 9928 - 9940 0 08/06/99
2-1/2" 8 9945 - 9982 0 07/30/98
4-112" LNR, 12.6#, L-80, .0152 bpf, Ð =3.953"
I. SAFElY NOTES:
8)
3-1/2" I-ES SSSV LAND NIP, Ð = 2.75"
ST MD
6 3070
5 51 07
4 6607
3 7768
2 8864
1 9399
GA S LIFT MANI:RELS
TV D DEV TYPE VL V LA Ta-i
2965 23 CA M DOME RK
4689 33 CA M DOME RK
5936 33 CA M DOME RK
6909 34 CA M DOME RK
7833 30 CA M SlO RK
8341 6 CAM DrvIY RK
PORT DATE
16 09/14/03
16 09/14/03
16 ?
16 09/14/03
20 ?
09/14/03
9462'
3-1/2" HES X NIP, ID = 2.750"
9475'
7" X 3-1/2" BKR S-3 PKR, ID = 3.875"
3-1/2"HESXNIP,ID=2.750"
952T
DA.TE REV BY CO MM 8\lTS DATE REV BY COMMENTS
09/28/97 JLM ORIGINAL COMPLETON
OS/28101 RN/TP CORRECllONS
09/14103 JCM/TLP GLV C/O
PRLDHOE BAY U\JIT
WELL: Z-03
PERMT I\b: 1971310
APII\b: 50-029-22787-00
SEC 19, T11 N, R12E, 976' SNL & 1427' EWL
BP Exploration (Alaska)
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Julie Heusser,
CommiSsioner
THRU'
Tom Maunder,
P. I. Supervisor
DATE: April 21, 2001
FROM' Lou Gdmaldi, SUBJECT'
Petroleum Inspector
SVS Tests
BPX Z-pad
Prudhoe Bay Field
Saturday, April 21, 2001; I witneSsed the three-month SVS retests on BPX Z pad
inthe Western Operating Area of the Prudhoe Bay Field.
Merv Liddelow performed the SVS tests today. The test results (one SSV Failure)
are noted on the accompanied SVS test spreadsheet. All well houses were in "OK"
condition.
This was the first exPerience i have had with the new SV control system on Z pad
and: found it: to operate quite well The temperatures today were somewhat mild
(+15)- and it. remains:to be seen how they will hold up during next winter's cold
season:. Wells Z-5 and Z-8 had slow clOsing SSV's (+ 2 minutes), Merv called the
AutomatiOn crew and these were being worked on before I left the pad.
The pad is being used as a staging area for some pipeline fabrication and has
some equiPment and material stored on it. This was kept for the most part neat and
orderly.
SUMMARY: I witnessed the three-month SVS retests on Z pad in the Prudhoe Bay
Field.
20 wells, 40 components, One failure, 2~4%
34 Wellhouse inspections, no problems.
Attachments: SVS PBU Z pad 4-21-01 LG.XLS
NON-CONFIDENTIAL
SVS PBU Z pad 4-21-01 LG
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: Merv Liddelow
AOGCC Rep: Lou Grimaldi
Submitted By: Lou G. Date:
Field/Unit/Pad: Prudhoe Bay Field, Z pad
Separator psi: LPS 159 HPS
21fA. pr
.............. $ss, V~ Retest W~ll Type
. ::
i [ I i i i III ' I I I
Well Pemit Separ Set ~ Test Test Test Date Oil, WAG, G~J,
Number Number PSI PSI Trip Code Code Code Pa~ed GASor~CL~
Z-01 1880660 I59 125 125 P P" '
Z-02A 1960430
Z-03 ' ' 1971310 '159 '125' ' 115~ P "~' ' ....
., , , , . . ,,
Z-04 1891230
Z-05 1900780 " 159 '125] 1~5 P 'P ....
. ,,, . ,, ~ a ,, .
Z-06 1880320 159 125: t25~ e e
z-07~ ~ 93 ~ ~ oo
Z'-08A 1931280 159 125 120 P ~ "
., ,, ..
Z-09 1890850
z-i0 '1891160 .....
z-11 1960720 159 125~ 12~ P P ....
i. ... .
Z-12 1891020
Z-13 1900940 159 125 12~ P P " '
z_~4~ "~98o~o ........
~ , ,
Z-15 1880880
Z'16 1920120 159 125 125 P P
, . ,,, ,. , . ., . i , ....
Z-17 1891390 159 125 125 P P
~ , , ., .,
Z-18 1890960
,
Z-19 1920230
,i . . ,~ , ,
Z-20 1881000
Z-21 1890420 ~59 lJ5 125 'e '"P .......
Z'-22B ' i~60350 159 125 115 e e
Z-23A 1950430 159 125 125 P P
z-54 ~890~80 ~59 125 ~2s P' 4 ~,h' b ~ ~(~ "~? "'
z-2b" ~88~'590 ' ~59 ~55 'i25 P e ....
, , .....
Z-26 1890520 159 125 125 P P
Z-27 190'0310 '159 125 125 e P "
, .....
Z_28- 1881270
Z-29 1890650 159~ 125 12~ P P .....
, , ,
Z-30 1900230 159 125 120 P P
, ,, . ,,, , .
~Z-31 1881120
Z'3}B 1970340 1~59 125 125! P ' ~e" '
~ .... I "' '
Z-33A 1890050
, , . .,,,, ,.,
Z-35 1980930
Z-38' 1980600 "'159 125~" 120 P P
,
, . . .. .
RJF 1/16/01 Page 1 of 2 SVS PBU Z pad 4-21-~ ~_G
I Number I Number/ PSII PSI I T~p I Code l Code! CodeI Passed I GASorCYCLE
Wells: 20 Components: 40 Failures: 1 Failure Rate: 2.50%
Remarks: Z-5 & 8 Long closure times on SSV.
RJF 1/16/01 Page 2 of 2 SVS PBU Z pad 4-21-01 LG
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
Julie Heusser
Commissioner
DATE'
January 23, 2001
THRU:
FROM:
Tom Maunder,
P. !. Supervisor
Jeff Jones, SUBJECT:
Petroleum Inspector
Safety Valve Tests
Prudhoe Bay Unit
· Z Pad
Friday. JanUary. 19. 2001: I traveled to BPX's Z Pad in the Prudhoe Bay Field and
witnessed surface safety valve system testing.
Merv Liddelow was the BPX representative in charge of testing. As the attached
AOG_CC Safety Value System Test Report indicates I witnessed the testing of 21
Wells and 43 components with 6 failures.' The pilot on well Z-03 failed to trip and the
pilot on well Z-08 was frozen and once thaWed it passed a retest but the SSV on
this well had an unacceptable closure time (12-min.). The SSV on well Z-18 also
had an unacceptable closure time (15-min.) and the SSV's on wells Z-22B and Z-24
failed to pressure test. The high failure rate on Z Pad requires it be placed on a 90-
day test interval.
Mr. Liddlow indicated to me today that all failures have been repaired except the
slow SSV closure of wells Z-08A and Z-18. The hydraulic lines on these wells need
to be flushed and he has arranged for the maintenance crew to perform the work.
Weilhouse inspections were conducted on the 21 wells tested with no exceptions
noted.
Summary: i witnessed SVS testing at BPX's PBU Z Pad.
21 wells, 43 components, 6 failures. 13.9% failure rate.
21 wellhouse inspections conducted.
Attachment: SVS PBU Z Pad 1-19-01 JJ
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: Merv Liddelow
AOGCC Rep: Jeff Jones
Submitted By: Jeff Jones
Field/Unit/Pad: PBF/PBU/Z Pad
Separator psi: LPS 159 ....
Date: 1/19/01
HPS
Well Permit Separ Set L/P Test Test Test Date
Oil, WAG, GINJ,
Number Number PSI PSI Trip Code Code Code Passed GAS or
z-'6~ ' ~'8~0660! ~9 ~2~ ~2~ '"~;.' P ' ' ' Om
Z-02A 1960430 .... ~ ........
Z-°3 1971310! 159 125 0 1 P .... OIL
, ,
Z-04 1891230!
Z'05 "1'900780' ' '159 ' 125 ' L'120 P '' ' P .... OIL
Z-06 1880320
Z-07A 19311001
Z'-08A . , i9312801 ' 159 "125 0 2 " 43 ' '1/2~/i)i .... 0IL
Z'09 1890856 ............................
Z-10 1891'160! ..............
Z-11 1900720 159 125~ ' 125 P P ....... OiL
z- 121 i1891020 ...........
z-13 1900940 159 125 125 P P OIL
Z-14A 19~0~10 ..............
z, ls 1880880
Z-16 '"1~}20120 159 1'25 .....125 ,.Lp ,p ,, ..oiL
z-17 1891390 159 125 125 P P OIL
Z-!8 .1890960.` .15.9 125,.~ 120 .. p 43. .......... OIL
Z- 19 1920230
Z-20 1881000
2'-2~ "' i89b,/2o ' '1 .............
Z-22B 1960350 i59i 125 125 P 4 ....... oIi~'
Z-23A 1950430
'Z'-24 .... 1890180' 159 125 130 p 4 OIL~
Z-25 188'1590 '' 159 ..... '12'5 ' 125' ' P ...... P' OIL
Z-26 1890520' 159 ' 1'55: ' 125' P '" P ....... 0IL
Z-2'~ ...... 1900310 159! ' i25"' ~25 P ' ? ......... iS~L
Z-28 1881270.
Z-29 189065i)'~ 'i59 125 12o~ P' P ..... OIL
Z'-30 ' 1900230 '159 ..... i2~ ~1~: ' ?' ~' Om
Z-31 1881120
7~-52B '"19~0340 'i59 ' '125 123 ..... P ' P .... OIL
Z-33A 1890050~ 2750 2600 2500 P P P GINJ
z,3s ~' "~/80930 ~59 ~25' "~20' 'P' P '
1/24/01 Page 1 of 2 SVS PBU Z Pad 1-19-01 JJ.xls
Well permit Separ Set L/P Test Test Test Date
Oil, WAG, GI~J,
Number Number PSI PSI Trip Code Code Code Passed GAS or CYCL~
Z-38 1980600 159 125 120 ~P P OIL
Wells: , ,,2.1. Components: 4._.___.~3 Failures: ,, , 6. Failure Rate: 13,:9°/d219omv, , .
Remarks:
ZT08A ss.v f..ai.l, ,ed:. ,12 rn~' ute e!oser, ~- ! 8 ~SSV failed: 1S minute dose..frozen pilot ..
thawed & passed retest.
1/24/01
Page 2 of 2
SVS PBU Z Pad 1-19-01 JJ.xls
STATE OF ALASKA
ALASKA LAND GAS CONSERVATION cor "ISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
[] Pull Tubing [--lAIter Casing [] Repair Well []Other
2. Name of Operator i5. Type [~ well:
Development
BP Exploration (Alaska)Inc. [] Exploratory
3. Address [] Stratigraphic
P.O. Box 196612, Anchorage, Alaska 99519-6612 I I--IService
[] Operation Shutdown [] Stimulate [] Plugging [] Perforate
4. Location of well at surface
976' SNL, 1427' EWL, SEC. 19, T11N, R12E, UM
At top of productive interval
3735' SNL, 3655' EWL, SEC. 19, T11N, R12E, UM
At effective depth
3746' SNL, 1295' EWL, SEC. 19, T11N, R12E, UM
At total depth
3750' SNL, 3673' EWL, SEC. 19, T11N, R12E, UM
6. Datum Elevation (DF or KB) KBE = 83.75
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
Z-03
9. Permit Number / Approval No.
197-131
10. APl Number
50- 029-22787
1. Field and Pool
Prudhoe Bay Field / Prudhoe Bay
Pool
12. Present well condition summary
Total depth: measured 10187 feet
true vertical 9210 feet
Effective depth: measured 10101 feet
true vertical 9124 feet
Casing Length Size
Structural
Conductor 50' 20"
Surface 3074' 9-5/8"
Intermediate 9670' 7"
Production
Liner 679' 4-1/2"
Plugs (measured)
Junk (measured)
Cemented
260 sx Arctic Set (Approx.)
449 sx 'G', 1427 sx CSlII
446 sx Class 'G'
82 sx Class 'G'
MD TVD
80' 80'
3104' 3080'
9700' 8725'
9508'- 10187' 8533'-9210'
Perforation depth: measured 9910'-9925'; 9928'-9940'; 9945'-9982'
true vertical 8934'-8949'; 8952'-8964'; 8796'-8809'
Tubing (size, grade, and'measured depth) 3-1/2", 9.3#, L-80 @ 9532'
Packers and SSSV (type and measured depth) Packer @ 9475'
SSSV @ 223O'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
See Attachment
Treatment description including volumes used and final pressure
14.
Prior to well operation:
Subsequent to operation:
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl
SI
Casing Pressure
Tubing Pressure
227 2146 0 0 199
15. Attachments j 16. Status of well classifications as:
[] Copies of Logs and Surveys run j [] Oil [] Gas [] Suspended
[] Daily Report of Well Operations i
17. I hereby c,e¢_fy.,~fCat the fore/eToing is trt.)e arid correct to the best of my knowledge
Michaelt.Williams .~',-%~J~_.__.~"?~.C~___.~"~f'-,'~.-,.'~.-.~__ Title Technical Assistant IV
Prepared By Name/Number:
Service
Date //X/~/~/~ ~
Form 10-404 Rev. 06/15/88
Submit In Duplicate
.~
Z-03
DESCRIPTION OF WORK COMPLETED
ADDPERF
O8/O6/99
SUMMARY
The following additional interval were perforated using 2 1/2" guns, 4 SPF,
random orientation and 60° phasing.
9928'- 9940' MD
AOGCC Geological Materials Inventory
PERMIT 9 7-131 ARCO
Log Data Sent
PEX-AIT ~'~0~- 10167 10/22/97
7832 ~"~CHLUM PEX-BHC/SL 10/6/97
7833 ~/SCHLUM GR 10/14/97
7841 /,.-~HL~ RST 10/15/97
7857 ~J~MAR MRIL 11/20/97
BHC/SL ~3/~'00 -7000 10/6/97
GAS LIFT-SPIN/ ~E'~/PRES 9750-10040 /c//:'. vt/~':[ ~9 8/19/98
C_~tUCC'L:zPERF ........... 13100-13430 ...... ¢~'~'~.~. t':;~ 'ir-'t'~",} tX/JJJ 12/17/97
JWL c~f300-9700 /~'t ~ ,~ !~tq ¢ 11/26/97
MMS SRVY /-ffP~RRY 9618.34-10118.69 12/10/97
MRIAN ANAL [~UMAR (C) 9710-10177 11/20/97
M~N ANAL ~AR (C) 9710-10177 11/20/97
M~N ANAL *~AR (C) 9710-10177 11/20/97
.
PE~ ~'5~0-10040 7/30/98 8/21/98
PE~ ~962-9982 10/14/97. 11/26/97
PE~ ~370-10050 10/18/9Z. 11/26/97
PE~ ~9300-9942 7/19/98 8/21/98
PEX-AIT ~0-7000 10/6/97
PEX-CN ~000-7000 10/6/97
PEX-CN&DT ~000-7000 10/6/97
PEX-SSTVD ~00-6980 10/6/97
PEX-SSTVD ~00-10187 10/6/97
PROD-SP~EM/ ~S 9750-10040 /el fj /~ 7(~ 8/19/98
RST ~0-7600 10/6/97
SR~ ~T ~CHLUM 0-9713. 12/5/97
TIME DOMA~ ~NUMAR (C) 9710-10177 11/20/97
Recieved
10/22/97
10/15/97
10/15/97
10/I 6/97
11/21/97
10/15/97
8/20/98
12/19/97 '
12/5/97
12/8/97
11/21/97 T
11/21/97 T
11/21/97 T
8/27/98
' 12/5/97
12/5/97
8/27/98
10/15/97
10/I 5/97
10/15/97
10/15/97
10/15/97
8/20/98
10/15/97
12/8/97
11/21/97 T
Box
o&%
Thursday, September 23, 1999 Page I of 2
Are dry ditch samples required? yes
Was the well cored? yes ~ no
Aretests required? yes ~ no
?~__no And received? ....... yeses_., no
Analysis _description recieved?
Received? ,.~-yes~ ..... ~ no
Well is in compliance
Comments
Initial
no
Thursday, September 23, 1999 Page 2 of 2
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrle
NO, 11460
Company:
Field:
Alaska O1! & Gas Cons Comm
Attn: Lorl Taylor
3001 porcupine Dr!ve
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
8/21/98
g~ .o~
Well Job # Log Description Date BL RF Sepia LIS Tape
A-41 PERFORATING REcoRD 980727 ' 1 1
A-41 JEWELRY LOG 980727 1 1
B-12A PERFORATING RECORD 980721 1 1
, , , ,,
E- 16 IBP SETrlNG RECORD 980 729 I 1
G- 09 PERFORATING RECORD , 9 80 724 1 1
,
G-i ~ WHIPSTOCK sETTING RECORD, ':' 980716. 1
G-15 wHIPSTOCK SETTING RECORD 980729 I 1
G-29 JEWELRY LOG 980725 1 1
G.29 PERFORATING RECORD , 980729 I ,1 ,,
, ,
K-6 CHEMICAL CIJ'r TUBING' .. * 980712 ! . 1
K-6 JET cl.n'rER, RECORD , ~, , ,', ,_ 980714. 1 1,
R-09 LEA.K DETECTI, ON .... 980713 1 1 ....
R- 14 PERFORATION RECORD 980722 I 1
R-18A cHEMICAL CUT RECORD ' 980709 ~ ' 1
R-18B SET 9 5/8' EZSV 980727 1 1
U-2 LEAK DETECTION 980717 I 1
X-04 PERFORATION RECORD 980713 1 1
Z-3 PERFORATING RECORD 980719 1 1
Z-3 PERFORATING RECORDS 980730 1 I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
PetroteCtnlCal Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVED
AUG 1998
Alaska Oil & Gas Cons. Comm~ '
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
STATE OF ALASKA -
ALASKA ~.,_ AND GAS CONSERVATION COrv,,¢,iSSlON
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: I--JOperation Shutdown ~Stimulate
[] Pull Tubing I IAIter Casing
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
2. Name of Operator
BP Exploration (Alaska)Inc.
4. Location of well at surface
976' SNL, 1427' EWL, SEC. 19, T11N, R12E, UM
At top of productive interval
3735' SNL, 3655' EWL, SEC. 19, T11N, R12E, UM
At effective depth
3746' SNL, 1295' EWL, SEC. 19, T11N, R12E, UM
At total depth
3750' SNL, 3673' EWL, SEC. 19, T11N, R12E, UM
[] Plugging E~ Perforate
[] Repair Well []Other
Type of well:
l~rDevelopment
Exploratory
[] Stratigraphic
[-~ Service
6. Datum Elevation (DF or KB)
KBE = 83.75
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
Z-03
9. Permit Number / Approval No.
97-131
10. APl Number
50-029-22787
11. Field and Pool
Prudhoe Bay Field /
Pool
Prudhoe Bay
12. Present well condition summary
Total depth: measured 10187 feet
true vertical 9210 feet
Effective depth: measured 10101 feet
true vertical 9124 feet
Casing
Length Size
Structural
Conductor 80' 20"
Surface 3074' 9-5/8"
Intermediate 9670' 7"
Production
Liner 8829' 4-1/2"
Plugs (measured)
Junk (measured)
Cemented
260 sx Arctic Set (Approx)
449 sx 'G', 1427 sx CSlII
446 sx Class 'G'
82 sx Class 'G'
MD TVD
164' 164'
3104' 3080'
9700 8725'
9508'-10187' 8533'-9210'
Perforation depth: measured
true vertical
9910'-9925',9945'-9982'
8934'-8949',8968'-9005'
Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 @ 9532'
Packers and SSSV (type and measured depth) Packer @ 9475'
SSSV @ 223O'
RECEIVED
JUL 14- 1998
13. Stimulation or cement squeeze summary
Intervals treated (measured)
See attachment
Treatment description including volumes used and final pressure
Alaska 011 & 6as Cons. Commission
Ar~ch0ra§e
14. Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl
Prior to well operation: 400 689 0
Subsequent to operation: 1413 1747 0
Casing Pressure Tubing Pressure
0 54
0 254
5. Attachments I16. Status of well classifications as:
I--I Copies of Logs and Surveys run I I~ ' I--I ~ I~.q n
........... Od ~ _as ~_~ vus~ended
I I uaily Report of Well Operations [
7. I hereby cj~itifv~hat~th,e fore~,~ng is,tru,e'/~d correct to the best of my knowledge
S~gned ~
' ~M~C~AE~~//~/~ Title Technical Assistant Ill
Service
Date
Prepared By Name/Number:
Form 10-404 Rev. 06/15/88
Submit In Duplicate
Z-03
DESCRIPTION OF WORK COMPLETED
Stimulation Operation
O2/27/98
A Mud Acid Stimulation Treatment was performed using the
following fluids:
SUMMARY
Fluid pack well and cool down perfs. Pumped 1st stage of Mud Acid Stim
Program consisting of 31bbls 12/10 HCL/Xylene, 46bbls 9/1 Mud Acid, 31 bbls
5%HCL. Over flushed with 100 bbls 2% NH4CI spacer. Park coil above perfs.
Pumped 12 bbls of 30ppg wax beads in HEC. Perfs completely blocked after 7
bbls gel/wax out of nozzle. Bled pressure down and tried to pump in slowly but
injectivity less than 0.3bpm at 2500psi WHP. Decide to circ out the 5% HCL acid
out of the coil and neutralize and attempt to flow the well back through Trico
overnight. 2/28/98 RIH with jetting nozzle. Dry tag at 3250 PU and saw o/pull to
20k at 3087'. Start pumping hot water and work down through wax plug. Returns
playing havoc with Trico. Large globs of wax seizing up flowmeters and sample
ports. Coil stby while Trico flow back acid to clean-up. Decision taken to abort
second mud acid stage and RD CTU. Suffered 5 gal oil/acid spill out of vac hose
bleed port while driver was pH testing his Icad. Fluid bled back through leaking
butterfly valve on vac truck. Notes: With hindsight we overlooked the wax
diversion design. Only 52ft net perfs, 2SPF = 104 perf holes. 500lbs wax was too
much for this new well. Aisc the particle size and shape was not optimal. The
smallest pieces were 2 - 3mm and the largest 2mm by 20mm strips. This is very
prone to plating out and jeopardizing the job. CT has been stuck in hole with this
before. Dowell are currently checking out the rest of their wax supply. Long term
we should consider sourcing an equivalent of BJ "Divert 1" as this appears to be
more forgiving for diversion acid stims. & Pad operator of completion of work and
to return to MI Injection.
Fluids Pumped
BBLS. Description
70 Methanol
610 2% KCL water
63 12/10 HCL/Xylene
46 9/1 Mud Acid
31 5% HCL
97 2% NH4CL/Water
917 Total Pumped
15311 VANTAGE PARKWAY WEST, SUITE 350 · HOUSTON, TX 77032 · (281) 590-5494 ° FAX: (281) 590-5495
December 12, 1997
State of Alaska
Alaska Oil & Gas Conservation Commission
Attn.: Lori Taylor
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Ms. Taylor:
Enclosed, please find the following items:
Nine-track tapes containing requested data for the wells W-03A1 and Z-03 (logged by
NUMAR) in LIS format
Revised list of mnemonics for NUMAR MRIL data
Hard copy of each tape scan
A second copy of this letter has been enclosed for your records. Please sign below to
acknowledge receipt of this package and send one copy to the following address:
BP Exploration (Alaska) Inc.
Attn.: Mr. David W. Douglas
Petrotechnical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Should you have any questions or concerns, please do not hesitate to call me.
Sincerely,~ ""~~5, ! ~,~ ~cv~0 //~//~-~ ~$ffr'o 7¢~. ~~
Dwa~e WeaVer
Encl°sure~_ .~ ~
Date
RECEiV. .,,
,)~C '! ? ,99'~
15311 VANTAGE PARKWAY WEST, SUITE 350 · HOUSTON, TX 77032 · (281) 590-5494 · FAX: (281) 590-5495
December 8, 1997
State of Aiaska
Alaska Oil & Gas Conse;wation Con,mission
Attn_: [..off T~_ylor
3001 Porcupine Dr/ye
Anchorage, Alaska 99501
Dear Ms. Taylor:
On November 20, I997, NUMAR sent you two nine-track tapes containing data thr We.Il
W-03AI arid Well Z-03, respectively. It has recently been determined that the data format
on the tapes is incon'ect. Thus, NT~,fAR will. reproduce the tapes. To prevent any future
cop~2usion, l~lease return -,h~ old tapes to my attention at your ear'2est convenience. Upon
receipt of the old tapes, NUMAR '~ll prepare two new tapes with the co,'iect data format.
Tha~Jc you/bt your assistance in this matter. Your prompt response ;viii allow- NUMAR
to distribute the corrected tapes in a timely manner. Should you have any questions or
concerns, please do not hesitate to call me.
Sincerely,
. : ~ .- , ,, ,
Dwayne x;V eaver
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION R EF 6 E IV E D
WELL COMPLETION OR RECOMPLETION REPORT AND LO EC -S 199 '
1. Status of Well Classification of Service Well
[~ Oil [] Gas [--I Suspended [] Abandoned [] Service ,~{~;I10ii & Gas Cons. CommJs
2. Name of Operator 7. Permit Number Allchorag8
BP Exploration (Alaska)Inc. 97-131
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22787
4. Location of well at surface . ~ - 9. Unit or Lease Name
976' SNL, 1427' EWL, SEC. 19, T11N, R12E, UM ~-'~.ii,i.:-?'. '~i -~- - Prudhoe Bay Unit
At top of productive interval ~ -- -;" '"~-:'~"' i.~"~~i 10. Well Number
3735' SNL, 3655' EWL, SEC. 19, T11N, R12E, UM i~.,~-/~/-~? l~
Z-03
At total depth .~~:i. ~~ ,11. Field and Pool
3750' SNL, 3673' EWL, SEC. 19, T11N, R12E, UM . _ Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Desig'~'ati0n:aJr~d Serial No. Pool
KBE = 83.75I ADL 028262
12. Date Spudded9/8/97 I 13' Date T'D' Reached t 14' Date C°mp" Susp" °r Aband'115' Water depth' if Offsh°re 116' N°' °f C°mpleti°ns9/23/97 9/28/97 N/A MSLI One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)I19. Directional Survey 120. Depth where SSSV set121. Thickness of Permafrost
10187 9210 FT 10101 9124 FTI [~Yes []NoI (Nipple) 2230' MDI 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, DIP, GR, ES/AlT, DT/BHC, CNL, LDL, GR, Caliper, SP, MRES, RFT, Numar, PST
23. CASINGr LINER AND CEMENTING RECORD
CASING SE'FrING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 80' 30" 260 sx Arctic Set (Approx.)
9-5/8" 40# L-80 32' 3104' 12-1/4" 449 sx 'G', 1427 sx CSlII
7" 26# L-80 30' 9700' 8-1/2" 446 sx Class 'G'
4-1/2" 12.6# L-80 9508' 10187' 6" 82 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
2-1/2" Gun Diameter, 2 spf 3-1/2", 9.3#, L-80 9532' 9475'
MD TVD MD TVD
9910' - 9925' 8934' - 8949'
9945' - 9982' 8968' - 9005' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 90 Bbls of Diesel
27. PRODUCTION TEST ~ ~ I f~ I ~t, t A I
DateoctoberFirst Production23, 1997 IMoth°alGas Lift°f Operation (Flowing, gas lift, etc.) U I~ I L~ 1 I~1 P, L
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure iCALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press, 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Sag River 9684' 8708'
Shublik 9708' 8732'
Shublik 'B' 9763' 8787'
Shubiik 'C' 9785' 8809'
Top of Sadlerochit 9842' 8866'
Zone 3 10121' 9144'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify tha~e foregoing is true an,,d correct to the best of my knowledge
i ~ ,~- ~'~'~"--"-~ Senior Date
Signed
'N~, Title Drilling Engineer, Acting
JamesSmith--/(~"-~
Z-03 ,/j 97-131 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number '"' Permit No./Approval No.
INSTRUCTIONS
GENERAL.' This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
10/18/97
Z-03
INITIAL PERF
SUMMARY
The following initial interval were perforated using 2 1/2" guns, 2 SPF, random
orientation and 0\60° phasing.
9910' - 9925' MD
9945'- 9982' MD
Performance Enquiry Report
Operator BP Exploration Date 18:04, 05 Dec 97 Page 1
Z-03 FIT End-of-well Report
The analysis is from - 04:30, 13 Sep 97 - to - 04:30, 13 Sep 97
Programs in Result Table: Z-03 Drill and Complete
Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) Depth MDR Hole Size MDR
Z-03 Event 04:30, 13 Sep 97 04:30, 13 Sep 97 0 hr 0 min Obtained required level of integrity 14.1 3250.0 8-1/2
Progress Report
Facility PB Z Pad
Well Z-03
Rig Nabors 18E
Page 1
Date 24 October 97
DatedTime
05 Sep 97
06 Sep 97
07 Sep 97
08 Sep 97
09 Sep 97
10 Sep 97
11 Sep 97
12 Sep 97
13 Sep 97
14 Sep 97
18:00-06:00
06:00-13:00
13:00-00:00
00:00-00:30
00:30-02:00
02:00-06:00
06:00-00:00
00:00-00:30
00:30-06:00
06:00-09:00
09:00-10:30
10:30-12:00
12:00-12:30
12:30-20:30
20:30-04:00
04:00-06:00
06:00-12:00
12:00-12:30
12:30-20:30
20:30-21:30
21:30-06:00
06:00-12:00
12:00-12:30
12:30-23:00
23:00-00:00
00:00-00:30
00:30-06:00
06:00-11:30
11:30-12:30
12:30-14:00
14:00-16:00
16:00-18:00
18:00-06:00
06:00-12:00
12:00-12:30
12:30-17:00
17:00-23:30
23:30-00:00
00:00-00:30
00:30-04:30
04:30-06:00
06:00-12:00
12:00-12:30
12:30-16:00
16:00-17:00
17:00-00:00
00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-13:00
13:00-15:30
15:30-17:00
17:00-20:00
Duration
12hr
7hr
llhr
1/2 hr
1-1/2 hr
4hr
18hr
1/2 hr
5-1/2 hr
3hr
1-1/2 hr
1-1/2 hr
1/2 hr
8hr
7-1/2 hr
2hr
6hr
1/2 hr
8hr
lhr
8-1/2 hr
6hr
1/2 hr
10-1/2 hr
lhr
1/2 hr
5-1/2 hr
5-1/2 hr
lhr
1-1/2 hr
2hr
2hr
12hr
6hr
1/2 hr
4-1/2 hr
6-1/2 hr
1/2 hr
1/2 hr
4hr
1-1/2 hr
6hr
1/2 hr
3-1/2 hr
lhr
7hr
1/2 hr
5-1/2 hr
6hr
1/2 hr
1/2 hr
2-1/2 hr
1-1/2 hr
3hr
Activity
Rig moved 30.00 %
Rig moved 30.00 % (cont...)
Rig waited · Equipment
Held safety meeting
Rig waited · Equipment
Rig moved 70.00 %
Rig moved 70.00 % (cont...)
Held safety meeting
Rig moved 90.00 %
Rig moved 100.00 % (cont...)
Held safety meeting
Made up BHA no. 1
Held safety meeting
Drilled to 360.00 ft
Serviced Fluid system
Drilled to 500.00 ft
Drilled to 863.00 ft
Held safety meeting
Drilled to 1550.00 ft
Pulled out of hole to 200.00 ft
Drilled to 2300.00 ft
Drilled to 2662.00 ft
Held safety meeting
Drilled to 3120.00 ft
Pulled BHA
Held safety meeting
Ran Casing to 1000.00 ft (9-5/8in OD)
Ran Casing to 3104.00 ft (9-5/8in OD)
Held safety meeting
Displaced slurry - 92.000 bbl
Circulated at 2101.00 ft
Displaced slurry - 488.000 bbl
Rigged up BOP stack
Rigged up BOP stack (cont...)
Held safety meeting
Tested BOP stack
Drilled installed equipment - DV collar
Tested Casing - Via string
Held drill (Kick (well kill))
Drilled to 3142.00 ft
Drilled to 3250.00 ft
Drilled to 3830.00 ft (cont...)
Held safety meeting
Drilled to 4211.00 ft
Pulled out of hole to 3104.00 ft
Drilled to 4657.00 ft
Held safety meeting
Drilled to 4877.00 ft
Drilled to 5195.00 ft (cont...)
Held safety meeting
Drilled to 5203.00 ft
Pulled out of hole to 0.00 ft
Made up BHA no. 3
R.I.H. to 5203.00 ft
Facility
PB Z Pad
Progress Report
Well Z-03
Rig Nabors 18E
Page
Date
2
24 October 97
Date/Time
15 Sep 97
16 Sep 97
17 Sep 97
18 Sep 97
19 Sep 97
20 Sep 97
20:00-00:00
00:00-00:30
00:30-06:00
06:00-09:30
09:30-10:30
10:30-12:00
12:00-12:30
12:30-20:30
20:30-00:00
00:00-00:30
00:30-02:00
02:00-03:30
03:30-06:00
06:00-07:00
07:00-12:00
12:00-12:30
12:30-13:45
13:45-14:00
14:00-00:00
00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-18:30
18:30-19:00
19:00-20:00
20:00-00:00
00:00-00:30
00:30-01:30
01:30-02:30
02:30-06:00
06:00-07:00
07:00-07:30
07:30-08:30
08:30-09:30
09:30-10:30
10:30-12:00
12:00-12:30
12:30-13:00
13:00-00:00
00:00-00:30
00:30-06:00
06:00-12:00
12:00-12:30
12:30-17:00
17:00-17:30
17:30-18:00
18:00-20:00
20:00-22:00
22:00-23:00
23:00-00:30
00:30-01:00
01:00-06:00
06:00-08:30
Duration
4hr
1/2 hr
5-1/2 hr
3-1/2 hr
lhr
1-1/2 hr
1/2 hr
8hr
3-1/2 hr
1/2 hr
1-1/2 hr
1-1/2 hr
2-1/2 hr
lhr
5hr
1/2 hr
1-1/4 hr
1/4 hr
10hr
1/2 hr
5-1/2 hr
6hr
1/2 hr
6hr
1/2 hr
lhr
4hr
1/2 hr
lhr
lhr
3-1/2 hr
lhr
1/2 hr
lhr
lhr
lhr
1-1/2 hr
1/2 hr
1/2 hr
llhr
1/2 hr
5-1/2 hr
6hr
1/2 hr
4-1/2 hr
1/2 hr
1/2 hr
2hr
2hr
lhr
1-1/2 hr
1/2 hr
5hr
2-1/2 hr
Activity
Drilled to 5542.00 ft
Held safety meeting
Drilled to 6095.00 ft
Drilled to 6222.00 ft (cont...)
Pulled out of hole to 5190.00 ft
Drilled to 6253.00 ft
Held safety meeting
Drilled to 6651.00 ft
Pulled out of hole to 669.00 ft
Held safety meeting
Pulled BHA
Made up BHA no. 4
R.I.H. to 3400.00 ft
R.I.H. to 6661.00 ft (cont...)
Drilled to 6893.00 ft
Held safety meeting
Drilled to 7000.00 ft
Held safety meeting
Drilled to 7697.00 ft
Held safety meeting
Drilled to 7950.00 ft
Drilled to 8227.00 ft (cont...)
Held safety meeting
Drilled to 8865.00 ft
Circulated at 8665.00 ft
Pulled out of hole to 7593.00 ft
Drilled to 8821.00 ft
Held safety meeting
Drilled to 8854.00 ft
Circulated at 8854.00 ft
Pulled out of hole to 1200.00 ft
Pulled out of hole to 171.00 ft
Pulled BHA
Made up BHA no. 5
R.I.H. to 3050.00 ft
Serviced Block line
R.I.H. to 8100.00 ft
Held safety meeting
R.I.H. to 8854.00 ft
Drilled to 9144.00 ft
Held safety meeting
Drilled to 9316.00 ft
Drilled to 9493.00 ft
Held safety meeting
Drilled to 9689.00 ft
Circulated at 9689.00 ft
Drilled to 9713.00 ft
Circulated at 9713.00 ft
Circulated at 9713.00 ft
Circulated at 9713.00 ft
Circulated at 9713.00 ft
Pulled out of hole to 8272.00 ft
Circulated at 8272.00 ft
Circulated at 8272.00 ft
Facility
PB Z Pad
Progress Report
Well Z-03 Page
Rig Nabors 18E Date
3
24 October 97
Date/Time
21 Sep 97
22 Sep 97
23 Sep 97
08:30-09:30
09:30-10:30
10:30-12:00
12:00-12:30
12:30-13:00
13:00-19:00
19:00-20:00
20:00-21:00
21:00-01:30
01:30-02:30
02:30-03:30
03:30-04:00
04:00-05:00
05:00-05:30
05:30-06:00
06:00-09:30
09:30-10:00
10:00-12:00
12:00-12:30
12:30-16:30
16:30-17:30
17:30-19:30
19:30-20:00
20:00-21:00
21:00-21:30
21:30-22:00
22:00-23:00
23:00-23:30
23:30-00:00
00:00-00:30
00:30-01:00
01:00-02:00
02:00-02:30
02:30-03:00
03:00-04:00
04:00-05:00
05:00-06:00
06:00-06:30
06:30-07:00
07:00-08:30
08:30-12:00
12:00-12:30
12:30-15:00
15:00-15:30
15:30-19:30
19:30-20:30
20:30-21:00
21:00-21:30
21:30-23:30
23:30-01:00
01:00-02:00
02:00-06:00
06:00-08:30
08:30-10:00
Duration
lhr
lhr
1-1/2 hr
1/2 hr
1/2 hr
6hr
lhr
lhr
4-1/2 hr
lhr
lhr
1/2 hr
lhr
1/2 hr
1/2 hr
3-1/2 hr
1/2 hr
2hr
1/2 hr
4hr
lhr
2hr
1/2 hr
lhr
1/2 hr
1/2 hr
lhr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
lhr
1/2 hr
1/2 hr
lhr
lhr
lhr
1/2 hr
1/2hr
1-1/2 hr
3-1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
4hr
lhr
1/2hr
1/2 hr
2hr
1-1/2 hr
lhr
4hr
2-1/2 hr
1-1/2 hr
Activity
Pulled out of hole to 7215.00 ft
R.I.H. to 9681.00 ft
Circulated at 9681.00 ft
Held safety meeting
Circulated at 9681.00 ft
Laid down 9681.00 ft of 5in OD drill pipe
Pulled BHA
Rigged up Wireline units
Conducted electric cable operations
Rigged down Wireline units
Rigged up Top ram
Tested Top ram
Rigged up Casing handling equipment
Held safety meeting
Ran Casing to 250.00 ft (7in OD)
Ran Casing to 3100.00 ft (7in OD)
Circulated at 3100.00 ft
Ran Casing to 5200.00 ft (7in OD)
Held safety meeting
Ran Casing to 6910.00 ft (7in OD)
Ran Casing to 9700.00 ft (7in OD)
Circulated at 9700.00 ft
Pumped Water spacers - volume 5.000 bbl
Serviced High pressure lines
Pumped Lo/Hi vis combination spacers - volume 70.000 bbl
Mixed and pumped slurry - 196.000 bbl
Displaced slurry - 369.000 bbl
Tested Casing
Rigged up Casing handling equipment
Held safety meeting
Rigged down Casing handling equipment
Installed Casing hanger & seal assembly running tool
Tested Seal assembly
Circulated at 3104.00 ft
Rigged up Top ram
Rigged up High pressure lines
Tested BOP stack
Rigged up Kelly
Tested Kelly
Made up BHA no. 6
Singled in drill pipe to 4561.00 ft
Held safety meeting
Singled in drill pipe to 6000.00 ft
Held safety meeting
Singled in drill pipe to 9615.00 ft
Tested Casing
Held drill (Kick while drilling)
Held drill (Kick (well kill))
Drilled installed equipment - Float shoe
Drilled to 9736.00 ft
Circulated at 9736.00 ft
Drilled to 9790.00 ft
Drilled to 9850.00 ft
Circulated at 9850.00 ft
Facility
PB Z Pad
Progress Report
Well Z-03 Page 4
Rig Naborsl8E Date 24October97
Date/Time
24 Sep 97
25 Sep 97
26 Sep 97
27 Sep 97
28 Sep 97
10:00-22:30
22:30-23:00
23:00-23:30
23:30-00:00
00:00-00:30
00:30-03:30
03:30-04:00
04:00-05:00
05:00-06:00
06:00-11:00
11:00-19:00
19:00-01:30
01:30-02:30
02:30-03:30
03:30-04:30
04:30-06:00
06:00-12:00
12:00-12:30
12:30-14:00
14:00-15:00
15:00-19:00
19:00-00:00
00:00-00:30
00:30-03:00
03:00-03:30
03:30-05:00
05:00-06:00
06:00-21:00
21:00-22:00
22:00-23:00
23:00-00:00
00:00-00:30
00:30-06:00
06:00-07:00
07:00-08:00
08:00-12:00
12:00-12:30
12:30-14:00
14:00-17:00
17:00-18:00
18:00-18:30
18:30-19:30
19:30-00:00
00:00-00:30
00:30-01:30
01:30-04:30
04:30-06:00
06:00-07:00
07:00-08:30
08:30-10:00
10:00-11:00
Duration
12-1/2 hr
1/2 hr
1/2 hr
1/2hr
1/2 hr
3hr
1/2 hr
lhr
lhr
5hr
8hr
6-1/2 hr
lhr
lhr
lhr
1-1/2 hr
6hr
1/2 hr
1-1/2 hr
lhr
4hr
5hr
1/2hr
2-1/2 hr
1/2 hr
1-1/2 hr
lhr
15 hr
lhr
lhr
lhr
1/2 hr
5-1/2 hr
lhr
lhr
4hr
1/2 hr
1-1/2 hr
3hr
lhr
1/2 hr
lhr
4-1/2 hr
1/2 hr
lhr
3hr
1-1/2 hr
lhr
1-1/2 hr
1-1/2 hr
lhr
Activity
Drilled to 10187.00 ft
Pulled out of hole to 9650.00 ft
R.I.H. to 10187.00 ft
Circulated at 10187.00 ft
Held safety meeting
Pulled out of hole to 633.00 ft
Pulled BHA
Rigged up Logging/braided cable equipment
Conducted electric cable operations
Conducted electric cable operations (cont...)
Conducted electric cable operations
Conducted electric cable operations
Rigged down Wireline units
Rigged up Casing handling equipment
Ran Liner to 657.00 ft (4-1/2in OD)
Installed Tubular strings
Ran Drillpipe on landing string to 9700.00 ft
Held safety meeting
Circulated at 10187.00 ft
Mixed and pumped slurry - 23.000 bbl
Circulated at 10101.00 ft
Laid down 6400.00 ft of 3-1/2in OD drill pipe
Held safety meeting
Laid down 9507.00 ft of 3-1/2in OD drill pipe
Tested Casing
Rigged up Wireline units
Conducted electric cable operations
Conducted electric cable operations
Rigged down Wireline units
Removed Bore protector
Ran Tubing to 950.00 ft (3-1/2in OD)
Held safety meeting
Ran Tubing to 6440.00 ft (3-1/2in OD)
Ran Tubing to 7286.00 ft (3-1/2in OD)
Installed SCSSSV nipple assembly
Ran Tubing to 9532.00 ft (3-1/2in OD)
Held safety meeting
Space out tubulars
Reverse circulated at 9532.00 ft
Set Production packer at 9474.00 ft with 3600.0 psi
Tested Casing
Installed BOP test plug assembly
Rigged down BOP stack
Held safety meeting
Rigged down BOP stack
Installed Xmas tree
Retrieved BOP test plug assembly
Tested Tubing
Freeze protect well - 90.000 bbl of Diesel
Freeze protect well - 90.000 bbl of Diesel
Installed Hanger plug
SPF~-~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU / Z-03
500292278700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/ 3/97
DATE OF SURVEY: 092397
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-70277
KELLY BUSHING ELEV. = 83.75 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS
DIRECTION
DEGREES DG/10
TOTAL
RECTANGULAR COORDINATES VERT.
0 NORTH/SOUTH EAST/WEST SECT.
9618.34 8642.82 8559.07 4 39 S 53
9706.26 8730.43 8646.68 4 57 S 52
9801.92 8825.77 8742.02 4 28 S 54
9897.75 8921.32 8837.57 4 13 S 54
9991.71 9015.05 8931.30 3 43 S 50
.92 E
.97 E
.43 E
.27 E
.78 E
00 2748.44S 2213.38E 3528.87
36 2752.83S 2219.29E 3536.00
52 2757.48S 2225.63E 3543.60
25 2761.72S 2231.54E 3550.61
60 2765.68S 2236.71E 3556.94
10086.67 9109.80 9026.05 3 52 S 48.50 E .23
10118.69 9141.75 9058.00 3 46 S 47.70 E .37
2769.75S 2241.50E 3563.13
2771.18S 2243.09E 3565.24
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 3565.24 FEET
AT SOUTH 38 DEG. 59 MIN. EAST AT MD = 10118
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 141.02 DEG.
TIE-IN SURVEY AT 9,618.34' MD
LAST SURVEY STATION AT 10,118.69' MD
ORIGINAL
SPF .... Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU / Z-03
500292278700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/ 3/97
DATE OF SURVEY: 092397
JOB NUMBER: AK-EI-70277
KELLY BUSHING ELEV. = 83.75 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION
9618.34 8642.82 8559.07
10118.69 9141.75 9058.00
2748.44 S 2213.38 E 975.52
2771.18 S 2243.09 E 976.94 1.42
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPF~Y-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU / Z-03
500292278700
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/ 3/97
INTERPOLATED VALUES
FOR EVEN 100
DATE OF SURVEY: 092397
JOB NUMBER: AK-EI-70277
KELLY BUSHING ELEV. = 83.75 FT.
OPERATOR: BP EXPLORATION
FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
9618.34 8642.82 8559.07 2748.44 S 2213.38 E 975.52
9659.41 8683.75 8600.00 2750.40 S 2216.07 E 975.66
9759.77 8783.75 8700.00 2755.57 S 2222.95 E 976.02
9860.08 8883.75 8800.00 2760.10 S 2229.28 E 976.33
VERTICAL
CORRECTION
.14
.37
.30
9960.34 8983.75 8900.00 2764.39 S 2235.14 E 976.59
10060.55 9083.75 9000.00 2768.58 S 2240.18 E 976.80
10118.69 9141.75 9058.00 2771.18 S 2243.09 E 976.94
.26
.21
.13
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMTTM CURVATURE) POINTS
SURVEY REPORT
Client: SSD
Field: Prudhoe Bay
Well Name: Z-03
APl number: 50-029-22787
Job number: 40001315
Rig: 18-E
County: NSB
State: AK
Surve,/Calculations
Calc method for positi{ Minimum Curvature
Calc method for DLS: Mason & Taylor
,Depth references
Permanent datum MSL 0 FT
Depth reference KB 83.75 FT
GL above Permanent 53.05 FT
KB above Permanent 83.75 FT
DF above Permanent 82.75 FT
Vertical section od(~in
Latidude (+N/S-): 0
Departure (+E/W-): 0
Azim from rotary table to target: 141.02
Schlumber~ler ANADRILL Survey Report
I Seq Measured Incl
# Depth angle
(ft) (deg)
1 0.00 0.00
2 155.11 0.87
3 252.06 1.00
4 342.80 1.55
5 434.88 2.02
6 535.23 1.96
7 617.98 2.07
8 711.81 1.74
9 802.32 1.68
10 895.95 1.75
11 989.84 2.03
12 1080.01 2.02
13 1173.87 2.31
14 1267.99 2.33
15 1360.60 2.41
16 1453.86 2.48
17 1549.62 2.52
18 1639.91 2.95
19 1732.78 3.10
20 1827.55 3.13
21 1921.33 3.12
22 2015.48 2.96
23 2107.36 4.01
24 2201.23 4.09
25 2295.80 4.15
26 2386.69 4.64
27 ~ 2480.37 6.23
28 2572.59 9.13
29 2664.50 11.26
30 2759.16 13.65
Azimuth
angle
(de~)
0.00
120.87
113.68
106.36
112.60
124.18
132.13
166.27
182.50
182.26
184.82
186.76
183.58
184.34
182.93
186.68
188.97
184.88
183.04
186.69
187.11
184.44
172.99
173.34
172.45
154.69
150.76
148.19
145.53
142.79
degrees
Course
length
0.00
155.11
97.00
90.70
92.10
Spud Date: 8-Sep-97
Last survey date: 19-Sep-97
Total accepted survey: 119.00
MD of first survey: 0.00 FT
MD of last survey: 9618.34 FT
0.00
100.30
82.80
93.80
90.50
93.70
93.80
90.20
93.90
94.10
92.60
93.30
95.70
90.30
92.90
94.80
93.70
94.20
91.90
93.80
94.60
90.90
93.70
92.20
91.90
94.70
Geomac~netic data
Magnetic Model: BGGM 1996 Version
Magnetic Date: 8-Sep-97
Magnetic field strengtl- 1146.59 HCNT
Magnetic dec (+E/W-) 28.10 degrees
Magnetic Dip: 80.66 degrees
MWD Survey Reference Cdteda
Reference G: 1002.68 milliG
Reference H: 1146.59 HCNT
Reference Dip: 80.66 degrees
Tolerance G: 3.00 milliG
Tolerance H: 6.00 HCNT
Tolerance Dip: 0.30 degrees
Correction
Magnetic dec (+E/W-) 28.10 degrees
Grid convergence (+E 0.00 degrees
Total az corr (+E/W-): 28.10 degrees
TVD Vedical Displacement Total ~ Azm
depth section +N/S- +E/W- displacement
0.00 0.00 0.00 0.00 0.00 0.00
155.09 1.11 -0.60 1.01 1.18 120.90
252.08 2.55 -1.32 2.42 2.76 118.69
342.76 4.26 -1.99 4.32 4.75 114.71
434.81 6.71 -2.96 7.01 7.61 112.91
535.05 9.91 -4.61 10.06 11.07 114.60
617.80 12.74 -6.40 12.34 13.91 117.42
711.55 15.71 -8.92 13.94 16.55 122.63
802.01 17.94 -11.58 14.21 18.33 129.20
895.67 20.05 -14.39 14.09 20.14 135.60
989.42 22.32 -17.47 13.89 22.32 141.51
1079.56 24.58 -20.64 13.57 24.70 146.68
1173.40 27.13 -24.18 13.25 27.57 151.26
1267.42 29.92 -27.98 12.99 30.85 155.09
1359.94 32.74 -31.80 12.75 34.26 158.15
1453.16 35.61 -35.76 12.42 37.86 160.85
1548.76 38.47 -39.90 11.85 41.62 163.46
1638.96 41.47 -44.17 11.34 45.60 165.60
1731.73 45.06 -49.06 11.00 50.28 167.36
1826.39 48.77 -54.19 10.57 55.21 168.97
1919.95 52.33 -59.26 9.95 60.09 170.47
2014.02 55.88 -64.23 9.45 64.92 171.63
2105.75 60.33 -69.79 9.66 70.45 172.12
2199.32 65,94 -76.36 10.45 77.08 172.21
2293.67 71,71 -83.11 11.30 83.87 172.26
2384.30 77.89 -89.91 12.70 90.81 171.96
2477.58 86.37 -98.01 16.18 99.34 170.63
2568.95 98.56 -108.60 22.48 110.90 168.31
2659.39 114.74 -122.19 31.40 126.16 165.59.
2751.86 135.13 -138.71 43.40 145.34 162.63
ORIGINAL
DLS
(deg/
lOOf)
Srvy Tool J
tool quality
0.00 TIP
0.56 MWD 6-axis
0.18 MWD 6-axis
0.63 MWD 6-axis
0.55 MWD 6-axls
0.41 MWD 6-axis
0.36 MWD 6-axis
1.24 MWD 6-axis
0.54 MWD 6-axis
0.07 MWD 6-axis
0.31 MWD 6-axis
0.08 MWD 6-axis
0.33 MWD 6-axis
0.04 MWD 6-axis
0.11 MWD 6-axis
0.19 MWD 6-axis
0.11 MWD 6-axis
0.52 MWD 6-axis
0.19 MWD 6-axis
0.21 MWD 6-axis
0.03 MWD 6-axis
0.23 MWD 6-axis
1.36 MWD 6-axis
0.09 MWD 6-axis
0.09 MWD 6-axis
0.84 MWD 6-axis
2.19 MWD 6-axis
3.17 MWD 6-axis
2.37 MWD 6-axis
2.60 MWD 6-axis
Page 1
Schlumber~ler ANADRILL Survey Report
Seq Measured Incl Azimuth Course TVD Vertical Displacement Total at Azrn DLS Srvy Tool
# Depth angle angle length depth section +N/S- +E/W- displacement (deg/ tool quality
(ft) (de~) (de~l) (ft) (ft) (ft). (ft) (ft) (ft) (dec~) 100I) b/f Re b/pe
31 2850.69 16.00 141.70 91.50 2840.31 158.53 -157,21 57.74 167.48 159.83 2.59 MWD 6-axis
32 2943.74 17.86 143.06 93.00 2929.27 185.60 -178.67 74.25 193.49 157,43 2.05 MWD 6-axis
33 3059.31 20.81 141.43 115.60 3038..34 223.86 -208.91 97.71 230.63 154.93 2.60 MWD 6-axis
34 3193.74 24.67 140.27 134.40 3162.27 275.80 -249.16 130.53 281.28 152.35 2.89 MWD 6-axis
35 3286.48- 28.72 140.45 92.80 3245.16 317.48 -281.25 157.13 322.17 150.81 4.36 MWD 6-axis
36 3382.29 31.94 140.97 95.80 3327.84 365,85 -318.69 187.76 369.89 149.50 3.38 MWD 6-axis
37 3478.07 33.72 141.76 95.80 3408.34 417.78 -359.29 220.15 421.37 148.50 1.91 MWD 6-axis
38 3573.87 34.25 144.37 95.80 3487.77 471.28 -402.10 252.29 474.70 147.89 1.61 MWD 6-axis
39 3668.68 34.06 145.31 94.80 3566.22 524.39 -445.62 282.93 527.85 147.59 0.57 MWD 6-axis
40 3764.86 34.39 142.99 96.20 3645.77 578.41 -489.47 314.62 581.86 147.27 1.39 MWD 6-axis
41 3859.38 34.02 141.37 ,~94.50 3723.93 631.51 -531.44 347.17 634.79 146.84 1.03 MWD 6-axis
42 3954.82 33.40 136.96 95.40 3803.30 684.40 -571.51 381.74 687.27 146.26 2.64 MWD 6-axis
43 4049.93 33.02 136.50 95.10 3882.86 736.35 -609.45 417.42 738.70 145.59 0.49 MWD 6-axis
44 4143.89 32.67 135.11 94.00 3961.84 787.11 -646.00 452.96 788.98 144.96 0.89 MWD 6-axis
45 4242.01 32.89 135.64 98.10 4044..32 839.98 -683.85 490.22 841.41 144.36 0.45 MWD 6-axis
46 4336.66 33.26 134.85 94.70 4123.67 891.40 -720.58 526.58 892.48 143.84 0.70 MWD 6-axis
47 4432.35 33.30 135.05 95.70 4203.68 943.62 -757.68 563.74 944.40 143.35 0.18 MWD 6-axis
48 4527.75 33.36 137.52 95.40 4283.39 995.85 -795.57 599.95 996.43 142.98 1.38 MWD 6-axis
49 4623.92 32.26 139.09 96.10 4364.16 1047.86 -834.44 634.59 1048.33 142.75 1.46 MWD 6-axis
50 4719.07 32.07 138.08 95.20 -!.,!.!..!..751098.49 -872.46 668.11 1098.88 142.56 0.59 MWD 6-axis
51 4814.41 32.18 138.47 95.30 4525.46 1149.11 -910.29 701.82 1149.43 142.37 0.25 MWD 6-axis
52 4909.76 32.00 137.62 95.40 4606.28 1199.72 -947.99 735.70 1199.97 142.19 0.54 MWD 6-axis
53 5002.56 31.85 138.55 92.80 4685.04 1248.73 -984.48 768.50 1248.92 142.02 0.54 MWD 6-axis
54 5096.01 32.85 144.21 93.40 4763.96 1298.65 -1023.50 799.66 1298.84 142.00 3.44 MWD 6-axis
55 5135.79 32.86 143.61 39.80 4797.40 1320.22 -1040.94 812.38 1320.42 142.03 0.82 MWD 6-axis
56 5221.93 32.73 143.42 86.10 4869.78 1366.81 - 1078.43 840.12 1367.04 142.08 0.20 MWD 6-axis
57 5314.40 32.56 143.42 92.50 4947.66 1416.66 -1118.49 869.87 1416.93 142.13 0.18 MWD 6-axls
58 5407.48 32.44 142.41 93.10 5026.18 1466.66 -1158.38 900.04 1466.94 142.15 0.59 MWD 6-axis
59 5501.52 33,76 142.27 94.00 5104.93 1517.98 -1199.03 931.40 1518.28 142.16 1.41 MWD 6-axis
60 5593.73 33.46 140.88 92.20 5181.71 1569.01 -1239.02 963.09 1569.31 142.14 0.90 MWD 6-axls
61 5687.88 34.62 14'i.15 94.20 5259.77 1621.74 -1280.00 996.28 1622.03 142.10 1.24 MWD 6-axis
'62 5780.46 35.22 141.53 92.60 5335.70 1674.74 -1321.37 1029.42 1675.03 142.08 0.69 MWD 6-axis
63 5871.75 34.92 140.65 91.30 5410.42 1727.20 -1362.17 1062.39 1727.48 142.05 0.65 MWD 6-axis
64 5964.59 34.70 139.34 92.80 5486.62 1780.16 -1402.72 1096.48 1780.42 141.99 0.83 MWD 6-axis
65 6055.77 34.42 139.35 91.20 5561.72 1831.88 -1441.94 1130.21 1832.10 141.91 0.31 MWD 6-axis
66 6148.20 34~.43 138.90 92.40 5637.94 1884.08 -1461.42 1164.42 1884.27 141.83 0.24 MWD 6-axis
67 6239.60 34.31 138.07 91.40 5713.39 1935.63 -1520.07 1198.60 1935.78 141.74 0.51 MWD 6-axis
68 6332.18 34.06 138.50 92.60 5789.99 1987.60 -1558.91 1233.22 1987.72 141.65 0.36 MWD 6-axis
69 6424.50 33.09 137.84 92.30 5866.89 2038.58 -1596.94 1267.27 2038.67 141.57 1.13 MWD 6-axis
70 6517.49 32.99 137.62 93,00 5944.85 2089.20 -1634.44 1301.39 2089.26 141.47 0.16 MWD 6-axis
71 6599.65 32.45 136.64 82.20 6013.95 2133.60 -1667.16 1331.55 2133.65 141.39 0.93 MWD 6-axis
72 6694.52 32.46 135.73 94.80 6093.94 2164.29 -1703.85 1366.79 2164.31 141.26 0.51 MWD 6-axis
73 6787.38 32.30 136.37 92.90 6172.40 2233.85 -1739.67 1401.32 2233.86 141.15 0.44 MWD 6-axis
74 6879.36 33.15 142.35 92.00 6249.82 2283.52 -1777.41 1433.63 2283.52 141.11 3.64 MWD 6-axis
75 6971.56 33.94 146.59 92.20 6326.67 2334.34 -1818.87 1463.18 2334.35 141.19 2.66 MWD 6-axis
76 7065,25 33.63 146.07 93.70 6404.55 2386.22 -1862.25 1492.05 2386.25 141.30 0.44 MWD 6-axis
77 7157.55 33,32 146.89 92.30 6481.54 2436.90 -1904.70 1520.15 2436.95 141.41 0.58 MWD 6-axis
78 7250.37 32.88 147.22 92.80 6559.28 2487.29 -1947.22 1547.72 2487.39 141.52 0.51 MWD 6-axis
79 7344.26 32.64 146,61 93,90 6638.24 2537.84 -1989.79 1575.46 2537.98 141.63 0.43 MWD 6-axis
80 7436.49 32.76 146.27 92.20 6715.83 2587.43 -2031.30 1602.99 2587.62 141.72 0.22 MWD 6-axis
81 7529.17 33.10 146.20 92.70 6793.64 2637.61 -2073.20 1630.99 2637.86 141.81 0.37 MWD 6-axis
82 7621.68 33.40 146.07 92.50 6870.99 2688.12 -2115.32 1659.24 2688.43 141.89 0.33 MWD 6-axis
83 7715.95 33.80 146.44 94.20 6949.46 2740.03 -2158.67 1688.20 2740.41 141.97 0.46 MWD 6-axis
84 7840.67 33.64 142.57 124.80 7053.27 2809.16 -2215.05 1728.41 2809.60 142.03 1.69 MWD 6-axis
85 7934.55 34.01 149.2.9 93.80 7131.19 2861.35 -2256.44 1760.23 2861.81 142.04 0.43 MWD 6-axis
86 8028.65 34.43 143.05 94.20 7209.09 2914.31 -2298.58 1792.33 2914.78 142.05 0.65 MWD 6-axis
87 8122.09 32.69 140.31 93.40 7286.92 2965.92 -2339.11 1824.30 2966.40 142.05 2.49 MWD 6-axis
88 8215.06 31.29 140.00 93.00 7365.79 3015.18 -2376.94 1855.87 3015.64 142.02 1.52 MWD 6-axis
Page 2
Schlumber~ler ANADRILL Survey Report
Seq Measured Incl Azimuth Course 'rVD Vertical Displacement Total atAzm DES Srvy Tool
# Depth angle angle length depth section +N/S- +E/W- displacement (deg/ tool quality
(ft) (de~l) (dec~) (ft) (ftI (ft/ (ft) (ftI (ftI (deg) 100fI ~ ~
89 8307.38 31.06 138.76 92.30 7444.77 3062.94-2413.21 1886.96 3063.37 141.98 0.72 MWD 6-axis
90 8401.45 31.50 139.30 94.10 7525.19 3111.77 -2450.12 1918.98 31'12.16 141.93 0.54 MWD 6-axis-
91 8495.94 32.02 139.12 94.40 7605.45 3161.43 -2487.73 1951.45 3161.80 141.89 0.56 MWD 6-axis-
92 8589.10 32.22 ' 140.49 93.20 7684.39 3210.97 -2525.58 1983.43 3211.31 141.86 0.83 MWD 6-axis'
93 8683.03 32.79 139.51 93.90 7763.58 3261.42 -2564.23 2015.87 3261.75 141.83 0.83 MWD 6-axis
94 8778.03 33.40 139.37 95.00 7843.17 3313.28 -2603.64' 2049.59 3313.57 141.79 0.64 MWD 6-axis
95 8809.65 32.17 138.56 31.60 7869.73 3330.38 -2616.56 2060.82 3330.67 141.78 4.13 MWD 6-axis
96 8842.11 . 30.10 136.89 32.50 7897.55 3347.15 -2629.00 2072.11 3347.43 141.76 6.92 MWD 6-axis
97 8873.83 28.31 135.96 31.70 7925.22 3362.57 -2640.21 2082.76 3362.83 141.73 5.81 MWD 6-axis
98 8905.86 26.62 134.54 32.10 7953.70 3377.30 -2650.73 2093.18 3377.54 141.70 5.69 MWD 6-axis
99 8938.00 25.27 133.44 32.10 7982.56 3391.23 -2660.48 2103.29 3391.45 141.67 4.46 MWD 6-axis
100 8967.70 24.25 130.26 ,~29.70 8009.53 340321 -2668.78 2112.54 3403.71 141.64 5.56 MWD 6-axis
101 8999.65 22.'81 128.23 32.00 8038.87- 3416.02 -2676.86 2122.43 3416.19 141.59 5.21 MWD 6-axis
102 9032.19 21.83 125.75 32.50 8068.94 3427.99 -2684.29 2132.29 3428.13 141.54 4.20 MWD 6-axis
103 9062.02 20.72 123.04 29.80 8096.71 3438,35 -2690.39 2141.21 3438.46 141.48 4.97 MWD 6-axis '
104 9092.36 19.41 121.38 30.40 8125.26 3448.22 -2695.95 2150.03 3448.30 141.43 4.67 MWD 6-axis
105 9124..13 17.86 120.85 31.70 8155.30 3457.74 -2701.19 2158.71 3457.81 141.37 4.93 MWD 6-axis
106 9155.66 15.99 120.33 31.60 8185.53 3466.36 -2705.86 2166.63 3466.41 141.32 5.94 MWD 6-axis
107 9185.21 14.54 119.20 29.50 8213.99 3473.60 -2709.72 2173.37 3473.63 141.27 5.01 MWD 6-axis
108 9215.72 12.91 120.99 30.50 8243.62 3480.35 -2713.34 2179.63 3480.38 141.23 5.52 MWD 6-axis
109 9247.17 11.69 127.06 31.50 8274.39 3486.76 -2717.08 2185.19 3486.77 141.19 5.65 MWD 6-axis
110 9278.64 10.33 135.81 31.40 8305.22 3492.65 -2721.02 2189.69 3492.66 141.18 6.83 MWD 6-axis
111 9310.17 9.08 143.57 31.60 8336.37 3497.96 -2725.06 2193.15 3497.98 141.17 5.73 MWD 6-axis
112 9339.82 7.63 149.22 29.60 8365.65 3502.24 -2728.63 2195.54 3502,26 141.18 5.61 MWD 6-axis
113 9371.58 6,32 151.02 31.80 8397.21 3506.06 -2731.97 2197,47 3506,07 141.19 4.18 MWD 6-axis
114 9403,91 5,90 148.48 32.30 8429,33 3509.45 -2734.94 2199,2 3509.47 141,2 1.54 MWD 6-axis
115 9434.52 5.56 139.82 30.60 8459.78 3512.49 -2737.41 2200.98 3512.51 141.2 3.04 MWD 6-axis
116 9466.11 5.66 135.49 31.60 8491.23 3515.58 -2739.69 2203.06 3515.59 141.2 1.37 MWD 6-axis
117 9496.67 5.83 133.57 30.60 8521.67 3518.62 -2741.84 2205.24 3518.63 141.19 0.83 MWD 6-axis
118 9559.56 4.64 127.55 62.90 8564.31 3524.26 -2745.59 2209.57 3524.27 141.17 2.09 MWD 6-axis
119 9618.34 4.65 126.08 58.70 8642.82 3528.87 -2748.44 2213.38 3528.88 141.15 0.19 MWD 6-axis
120 9713.00 4.65 126.08 94.70 8737.21 3536.29 -2752.90 2219.58 3536.29 141.12 0.00 Extrapolated
Page 3
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11598
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
11/26/97
-1:2.'-' 090
Well Job # Log Description Date BL RF Sepia LIS Tape
C-01 0 PRODUCTION PROFILE 971 010 I 1
,_
E- 14. WHIPSTOCK SETTING RECORD 971 007 I 1
, ,
G~03A , STATIC TEMP & PRESS SURVEY 970929 I 1
H-08 · CORRELATION LOG GPJCCL 9 71 019 I 1
H-10 ,---- [~L~ d..~. TUBING PUNCH RECORD 971 009 I 1
H- 10 ~ ~ BRIDGE PLUG SET RECORD 9 71 01 3 I 1
--
J-06 , / TEMPERATURE-PRESSURESURVEY 971011 1 ,. 1
,.M-30 ~.%.t ~ ,// INJECTION PROFILE 970915 I 1
N-22 · PRODUCTION PROFILE LOG 971 009 1 1
P-22 , STATIC PRESSURE SURVEY 971 01 0 1 1
R-16 ~ WHIPSTOCK RECORD 971017 I 1
S-42 0 LEAK DETECTION LOG 971012 1 1
W-06A * PERFORATION RECORD 971017 I 1
W-23 · JEWELRY LOG CCL/GR 970901 I 1
Z-03 , PERFORATING RECORD 97101 4 I 1
Z-03 , JEWELRY LOG 971 014 I 1
Z-03 , PERFORATING RECORD 971 018 I I
-/-'/-
?'"/¢
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
15311 VANTAGE PARKWAY WEST, SUITE 350 · HOUSTON, TX 77032 ° (281) 590-5494 ° FAX: (281) 590-5495
November 20, 1997
State of Alaska
Alaska Oil & Gas Conservation Commission
Attn.: Lori Taylor
3001 Porcupine Drive
Anchorage, Alaska 99501
Dear Ms. Taylor:
Enclosed, please
· Nine-track tape containing requested data for the Well Z-03 (logged by NUMAR) in
LIS
· List of mnemonics for NUMAR MSHL data
· Hard copy of tape scan
· Color logs
A second copy of this letter has been enclosed for your records. Please gign below to
acknowledge receipt of this package and send one copy to the following address:
BP Exploration (Alaska) ~c.
Attn.: Mr. David W. Douglas '
Petrotechnical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Should you have any questions or concerns, please do not hesitate to call rne.
Sincerely,
Dwayne Weaver
Enclosures
Signamre,(~
Date NOV ?- 1 '~997
~'qas.'~a Ot .& Gas Cons. C0mmissi0n
~,n,'.h, era.qer
LIST OF MNEMONICS FOR MRIL DATA:
· MPHI - MRIL Porosity
· MPHE - MRIL Porosity (AWS designation)
· PHIMD - MRIL porosity (decimal) from Numar MR/AN processing.
· MBVI - MRIL bulk volume irreducible, max(SBVI, CBVI)
· BVIMD - MRIL bulk volume irreducible (decimal) from Numar MRIAN processing.
· MFFI - Free fluid index (does not have T1 or Hydrogen Index correction)
· FFIMD - Free fluid index (decimal) from Numar MRIAN processing.
· MBVM - Bulk Volume Moveable Fluid (MFFI corrected for Ti and Hydrogen Index)
· MCBW - Volmne of clay bound water
· MPERM - MRIL permeability
· MPRM - MtHL permeability (AWS designation)
· MPHG - Gas volume from Time Domain Analysis (corrected for Hydrogen Index and TI)
· MPHO - Oil volume from Time Domain Analysis "
· MPHW - Water volume from Time Domain Analysis "
· MGAS - Uncorrected gas volume from Time Domain Analysis
· MOIL - Uncorrected oil volume from Time Domain Analysis
· MWTR - Uncorrected water volume from Time Domain Analysis
· PHIE - Effective porosity from Time Domain Analysis
· BVIL - Bulk Volume Irreducible from Time Domain Analysis
· MSIG - Porosity sum (MCBW+MBVI+MBVM)
· MPHS - Apparent porosity (MPHE+MCBW)
· ECHOxxx or Exxx - MRIL Echo amplitude for echo number xxx.
· ECHO - Amplitude of echo (array format data)
· PHASxxx or Pxxx - MRIL Phase angle corresponding to echo nmnber xxx.
· PHAS - Phase angle of echo (army format data)
· P1PR - MRIL partial porosity bin at 0.5 ms
~ P2PR - M~,P~ partial porosity-bin at 1.0 ms
· P3PR - MRIL partial porosity bin at 2.0 'ms
· PI through Pxx - MRIL partial porosity (T2R) distribution bins from MAP processing.
·
Rev. 4/7/97
P136 through p936 - MRIL partial porosity (T2R) distribution bins from MAP processing ( TE=3.6 ~ns)
BIN1 through BINxx - Summation of partial porosities (P1-Pxx) from MAP processing. For example BINi=P1,
BIN2=PI+P2, BIN3=Pi+P2+P3 etc.
· CBVWE - Bulk volume water effective from Numar MRIAN analysis
· CBVWT - Bulk volume water total frown Numar MRIAN analysis
· WI - Textural parameter assuming irreducible conditions
· WW - Textural parameter assuming water wet conditions
· WQ - Textural parameter used for CBVWE computation
· PMRI - MRIL permeability from Numar MRIAN analysis, uses clay-corrected neutron-density Porosity rather than
MPHI as the porosity input.
· VCLAY - Volume of dry clay from CTP processing
· VSHALE - Dry shale volume from CTP processing
· CLPHIAPP - Apparent clay porosity from CTP processing
· CLAYLINE - T2 cutoff between clay and capillary bound water
· BVILINE - T2 cutoff between capillary bound and free fluid
· T2 or T2GM - Transverse relaxation time
· T2xx - T2 computed from TE = xx ms
· IT2 - Inverse of T2
· D - Coefficient of diffusion
· DW - Coefficient of diffusion for bulk water
· RDDW - Ratio of D to DW
· SW_T2D - Water saturation from T2 and diffusion log
· SHY - Hydrocarbon saturation from T2 and diffusion log
PORE_PAD - Pore radius from T2 and diffusion log
· T1 or Ti_I - Longitudinal relaxation ti~ne (TI_I refers to T1 derived from uni-exponential fitting)
NOV 2 1 1997
AJ~a Oil & Gas Oons. uu, r,~Nssion
gnc.,horage
· SWBM - Clay bound water saturation frbm MRIAN analysis
· PND - Neutron - density crossplot porosity
· CALIFLAG - Bad hole flag, typically computed using caliper and/or conventional porosity excursions.
· RT - Deep induction with borehole and invasion corrections
· GR - Gamma ray from conventional log mn
· CALl - Caliper from conventional log mn, typically from density logs
· SP - Spontaneous potential from conventional logs
· PEF - Photoelectric effect from conventional logs
· IDPH, liD, AT90, AF90, AO90, LLD, RILD, HDRS, DVR2, etc. - Deep resistivity from conventional logs
· . IM~H, liM AT30, AF30, AO30, LLS, RILM, HMRS, MVR2, etc. - Medium resistivity from conventional logs
· SFLU, SFL, AT10, AFl0, AO10, MSFL, RFOC, DFL, etc. - Shallow or micro-resistivity from conventional logs
· PDSS - Density porosity using 2.65 gm/cc matrix density computed from conventional RHOB
· PDLS - Density porosity using 2.71 gm/cc matrix density computed from conventional RHOB
· PDDOL - Density porosity using 2.87 gm/cc matrix density computed from conventional RHOB
· PCNSS - Neutron porosity using sandstone ~natfix computed frown conventional NPHI
· PCNLS - Neutron porosity using limestone matrix computed from conventional NPHI
· PCNDOL - Neutron porosity using dolomite matrix computed from conventional NPHI
· GAMMA - MRIL gamma ray
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11472
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
10/21/97
Field: Prudhoe Bay (Open Hole)
LIS
Well Job # Log Description Date BL RF Sepia Tape
Z-03 97440 PEX/BHC 970924 1
Z-03 97440 PEX-AIT 970924 I 1
.REDO:TOOLFAILED ON RUN#1.GEOQUEST WAS NOTINFORMED &THE EDITHADTO BE REDONE.NEW FILM FOR AlT W/iS GENERA1ED.
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
RECEIVEL
OCT 2 2 199
Anch0r~le
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received by .
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11452
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Prudhoe Bay (Cased Hole)
10/15/97
Well Job # Log Description Date BL RF Sepia LIS Tape
Z-03 ~ '"7'~' ~/ 97450 RST 970926 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11446
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: Prudhoe Bay (Open Hole)
LIS
Well Job # Log Description Date BL RF Sepia Tape
Z-03' ,~"'~'-? ~_ ~"~ 97462 MWDGR 970920 I
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
10/14/97
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
0CT 1 5 1997
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
GeoQuest
500 w. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11418
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Well
Field:
Job # Log Description Date BL
Prudhoe Bay (Open Hole)
LIS
RF Sepia Tape
Z-03 (COMPOSITE RUNS I & 2) 97440 PEX~BHC~AIT, NEUTRON~DENSITY 970924 1
Z-03 (COMPOSITE RUNS 1 & 2) 97440 PEX-BHC 970924 I 1
Z-03 (COMPOSITE RUNS I & 2) 97440 PEX-NEUTRON 970924 I 1
Z-03 (COMPOSITE RUNS I & 2) 97440 PEX-DENSlTY 970924 1 1
Z-03 (COMPOSITE RUNS I & 2) 97440 PEX-AIT 970924 I 1
Z-03 PEX-SSTVD 970920 I 1
Z-03 PEX-SSTVD 970924 I 1
Z-03 RST 970926 I I
1 O/6/97
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
Julv 17. 1997
Paul K. Prince
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bav Unit Z-03
BP Exploration (Alaska) Inc.
Permit No: 97-131
Sur. Loc. 976'SNL. 1427'EWL, Sec. 19, T11N. R12E. UM
Btmholc Loc: 1543'NSL. 1305'WEL. Sec. 19. T1 IN. RI2E. UM
Dear Mr. Prince:
Enclosed is thc approved application for permit to drill thc above referenced well.
The permit to drill docs not exempt you from obtaining additional permits rcquired bv law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035.
Sufficicnt notice (approximatcly 24 hours) of the BOPE test performed bcforc drilling bcloxv the
surface casing shoe must be given so that a representative of the Commission max.' xvitncss the test.
Notice max, be given bv contacting the Commission petroleum field inspector on the North Slope
pager at 659-3607.
BY ORDER OF THE COMMISSION
d!f,-enclosures
Department o1' Fish & Game. [ Iabitat Section w, o encl.
Department et' I'~nvi~lomm¢ll! Consen'ation w;o encl.
STATE OF ALASKA
ALASKA .~,L AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan KBE - 83.75' Prudhoe Bay Field / Prudhoe
3. Address 6. Property Designation Bay Pool
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028262
4. Location of well at surface 17. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
976' SNL, 1427' EWL, SEC. 19, T11N, R12E, UM Prudhoe Bay Unit
At top of productive interval 8. Well Number Number 2S100302630-277
1543' NSL, 1305' WEL, SEC. 19, T11N, R12E, UM Z-03
At total depth 19. Approximate spud date Amount $200,000.00
1543' NSL, 1305' WEL, SEC. 19, T11N, R12E, UM 07/20/97
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 047453, 1543'I Z-04, 38' away at 939' MD 2560 10188' MD/9201' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 2000' Maximum Hole Angle 33° Maximum surface 3330 psig, At total depth (TVD) 8800' / 4390 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 91.5# H-40 Weld 80' Surface Surface 110' 110' 260 sx Arctic Set (Approx.)
12-1/4" 9-5/8" 40# L-80 BTC-Mod 3114' Surface Surface 3114' 3084' 120 sx CSIII, 470 sx 'G', 1955 sx CSIII
8-1/2" 7" 26# L-80 BTC-Mod 9736' Surface Surface 9736' 8449' 505 sx Class 'G'
6" 4-1/2" 12.6# L-80 IBT-Mod 602' 9586' 8579' 10188' 9201' 105 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented M D TVD
Structural
Conductor
Surface
Intermediate NXL
LPirn°edrUCtion ORIGI
REC[iVED
Perforation depth: measured
dUL -}, 199[
true vertical
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling
[] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 R~quirements
Contact Eng/neer Name/Number: Davjd~Vakamura, 564-5606 Prepared By Name/Number: Terrie Hubble, 564-4628
21. ] hereby certify that the fCr,~:joir~ i¢/~ru~nd correct to the best of my knowledge -¢'rl
Signed y~j,~¥1,~ ~ ~
Paul K. Prince '-"'- Title Senior Drilling Engineer Date ~ '~ %
Commission Use Only
Permit Number I APl Number I Approval Date See cover letter
~',~"/-~ ,/I 50- ~ ,2_. ~ -- ~ Z,, 7 ~ ~] '~ ~/~'' 9>'~ for other requirements
Conditions of Approval: Samples Required []Yes IXINo Mud Log Required []Yes ~No
Hydrogen Sulfide Measures I~Yes []No Directional Survey Required []Yes []No
Required Working Pressure for BOPE 1-12M; 1-13M; [~SM; [-]10M; I--I15M
Other:
dr~g~nat Signed By by order of
Approved By W. Johnston Commissioner the commission Date "~
Form 10-401 Rev. 12-01-85 Submit In Triplicate
Iwell Name: Iz-03
Well Plan Summary
I Type of Well (producer or injector): I Oil Producer
Surface Location: 976' FNL 1427' FWL Sec 19 T11N R12E
Target Location: 1543' FSL 1305' FEL Sec 19 T11N R12E
Bottom Hole Location: 1543' FSL 1305' FEL Sec 19 T11N R12E
I AFE Number: I 4P0974 I
I Rig: I Nabors 18E
I Estimated Start Date: I July 20, 1997 I I Operating days to complete: 120
I MD(LL): 110188' I I TVD(EL):19201' I IRT-GL
I KBE:
I Well Design (conventional, slimhole, etc.)
Ultra Slimhole S-Shaped Well
I29.7'
83.75'
Formation Markers:
Formation Tops MD TVD (RKB)
Base Permafrost 1885' 1884'
Sag River 9716' 8729'
Shublik 9745' 8758'
Sadlerochit 9886' 8899'
HOT 10038' 9051'
OOWC 10064' 9077'
TD 10188' 9201'
I
I
Casin I/Tubing Proqram:
Hole Size Csg/ Wt/Ft Grade Conn. Length Top Btm
Tbg O.D. MD/TVD MDrrVD
30" 20" 91.5# H-40 Weld 80' Surface 1107110'
12-1/4" 9-5/8" 40# L-80 BTC- 3114' Surface 3114'/3084'
MOD
8-1/2" 7" 26# L-80 BTC- 9736' Surface 9736'/8449'
MOD
6" 4-1/2" 12.6# L-80 IBT- 602' 9586'/8579' 10188'/9201 '
MOD
Tubing
Directional:
IKOP: 12000, I
Tangent Angle
Close Approach Well:
33.0°
Z-04 (38' away at 939' MD), Z-02A (63' away at
2150' MD) and Z-01 (82' away at 2217' MD)
Z-03 Permit Info Page 1
Logging Program:
MWD Directional
MWD: GR/Directional
MWD: ESS
E-Line: AIT/LDT/CN L/G R/S P/Caliper
Optional: CNL/CBT
Mud Program:
Surface Mud Pr(~perties: I Surface hole section: SPUD
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
Initial 8.5 _ 300 40-60 30-60 50-80 9-10 15-25
Final 9.5 200-300 25-50 15-25 25-40 9-10 15-25
Hazards/Concerns Due to light gravel expectations, no real concerns in surface hole.
Intermediate Mud Properties: I Intermediate hole section: LSND
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
Initial 8.8-9.0 35-40 8-12 3-6 8-10 9.0-9.5 8-12
Ku paru k 10.6 40-45 10-12 4-8 8-12 9.0-9.5 6-8
Kingak 10.6-11.0 40-55 12-18 4-8 8-18 9.0-9.5 <6
HTHP-12.0
Final 10.6-11.0 40-55 12-18 4-8 8-18 9.0-9.5 <6
HTHP-12.0
Hazards/Concerns Kuparuk overpressure expected on Z Pad, MW to be at least 10.6 ppg.
Utilize hi vis sweeps to assist hole cleaning
Monitor LSYP and increase if problems occur trying to clean the hole.
Potential high torque could need lubricants (EP MudLube)
Reduce APl fluid loss to <6 cc before drilling Kingak Section.
If high torque is encountered, respond with lubricants.
Note: The Jurassic shales may be troublesome, so treat with 2 ppb Baratrol and 6 ppb
Baranex.
Sadlerochit Mud Properties: I Production hole section: New LSND
Depth Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
Initial 8.8-9.0 45-53 12-15 4-8 8-12 8.5-9.0 <6
Final 8.8-9.0 45-53 12-15 4-8 8-12 8.5-9.0 <6
Hazards/Concerns Lost Circulation a possibility due to overbalance in Sadlerochit.
Differential sticking possible with overbalance situation.
High torque may be experienced and should be countered with lubricants
Well Control:
Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is
capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Z-03 Permit Info Page 2
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL: Z-03
1. MIRU. NU diverter and function test same.
.
Drill 12-1/4" hole to +_3114' MD/3084' TVD. Run and cement 9-5/8" 40# L-80 BTC-MOD casing to surface with
Halliburton ES Cementer (two stage surface cement job).
.
Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular
preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir
pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600'
TVDss and an oil column to 8800' TVDss. Function test BOPE to 5000/250 psi.
.
Test 9-5/8" casing to 3000 psi for 30 minutes. A formation leak-off test will be performed when 20' of new hole
has been drilled below the 9-5/8" shoe. Also, perform a well kill drill at this time.
,
Directionally drill 8-1/2" hole to 7" casing point at +_9736' MD/8749' TVD. Run 7" 26# L-80 BTC-MOD casing
string and cement with Class G cement to 500' MD above the Ugnu. Test casing to 3,500 psi. The annulus
will be freeze protected with dead crude oil.
,
Drill 20' of new 6" hole and test the formation to a minimum of 0.5 ppg over the mud weight to be used to drill
the previous hole section. Displace mud system to new LSND mud system. Rotary drill 6" section to TD at
+_10188' MD/9201' TVD.
7. RU Schlumberger. E-line log well with AIT/LDT/CNL/GR/SP/Caliper.
RIH with 4-1/2", 12.6#, L-80 liner, 2-7/8" inner cementing string and a 7" x 4-1/2" packer/hanger spaced out for
a 150' lap. Pump cement and displace well with seawater. Bump plug. Set and test liner hanger/packer with
3500 psi. Continue displacing well to seawater.
10.
Run 3-1/2", 9.3# L-80 EUE-MOD tubing with SSSV, GLMs, and 7" packer assembly. Circulate around freeze
protection fluid and corrosion inhibitor. Set packer and test tubing to 4,000 psi.
Set TWC and test to 1000 psi. ND BOPE. NU tree and test to 5000 psi. Pull TWC. Test tubing x casing
annulus to 3500 psi for 30 minutes. Secure well. Release rig.
Drilling Hazards
· Hydrocarbon-bearing zone in the Ugnu formation.
Losses have been encountered drilling the Kingak, Sag River/Shublik and Sadlerochit formations on Z Pad. Be
prepared for losses near any faults and formation interfaces between the Kingak, Sag River/Shublik and
Sadlerochit.
A minimum of 10.6 ppg mud weight will be used to drill the Kuparuk interval. Hi~'t'~r~,JJ¥~['~tl~i~ls,.~ ~j~ud weight
used to drill the Kuparuk on Z Pad.
Disposal
Cuttings Handling:
Fluid Handling:
Cuttings should be hauled to the ball mill at CC-2A. ~a.S~. 0il & i~a.~ C:~;$, C0i~,]!~issior~
Anch0ra!~
Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all
Class I wastes to Pad 3 for disposal. In addition, haul all cutting from drilling operations to CC-
2A for disposal, except the metal cuttings which will be sent to the North Slope Borough.
Z-03 Permit Info Page 3
9-5/8" CASING CEMENT PROGRAM
CASING SIZE: 9-5/8"
FIRST STAGE CEMENT
PREFLUSH: 75 bbls viscosified fresh water ahead of lead slurry.
CIRC. TEMP: 38°F
LEAD CEMENT TYPE: COLD SET III (accounts for any variance in depth of ES cementer)
ADDITIVES: retarder
WEIGHT: 12.2 ppg
APPROX. # SACKS: 120
TAIL CEMENT TYPE: CLASS G
ADDITIVES: 2% A-7 +1 ghs FP-6L
WEIGHT: 15.8 ppg
APPROX. # SACKS: 470
YIELD: 1.92 ft3/sx
MIX WATER: 10.53 gps
THICKENING TIME: Greater than 4 hr. @ 50°F
YIELD: 1.15 ft3/sx
MIX WATER: 4.95 gps
THICKENING TIME: Greater than 3-1/2 hr. @ 50°F
SECOND STAGE CEMENT
PREFLUSH: 75 bbls viscosified fresh water ahead of lead slurry.
LEAD CEMENT TYPE: COLD SET III
ADDITIVES: retarder - (Add 9 ppb Borax to first 30 bbls (90 sx) of Cold Set III lead cement in second stage)
WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx MIX WATER: 10.53 gps
APPROX. # SACKS: _+1955 THICKENING TIME: Greater than 4 hr. @ 50°F
TOP JOB CEMENT TYPE: COLD SET II (if necessary)
ADDITIVES:
WEIGHT: 14.5 ppg
YIELD: 0.96 ft3/sx
MIX WATER: 3.89 gps
APPROX. # SACKS: 250 THICKENING TIME: Greater than 2 hr. @ 50°F
CENTRALIZER PLACEMENT:
1. Run one (1) bow spring centralizer per joint for the first 15 joints.
CEMENT VOLUME:
1. Lead slurry volumes estimated:
a. Base of Permafrost to Conductor shoe with 400% exces,s
b. Conductor x Surface Casing annulus (80' MD) ~[~¢>
c. Cement in surface casing to the ES Cementer at 1,800' MD
NOTE: With the two stage job, the actual lead cement volumes will be determined by the amount of
cement necessary to get lead cement to surface.
2. Tail slurry volume from surface casing shoe to Base Permafrost with 30% excess plus the 80' shoe volume
3. Top job volume 250 sx (if necessary)
Z-03 Permit Info Page 4
7" CASING CEMENT PROGRAM
CASING SIZE: 7"
PREFLUSH: 20 bbls fresh water
SPACER: 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight.
CIRC. TEMP: 140°F
LEAD CEMENT TYPE: CLASS G
ADDITIVES: 3% A-2 + 0.4% FL-52 + 0.5% CD-32 + 1 ghs FP-6L
WEIGHT: 11.0 ppg
APPROX. # SACKS: 320
YIELD: 3.31 ft3/sx
THICKENING TIME: 5 hrs
MIX WATER: 20.92 gps
FLUID LOSS: 150-250 cc/30 minutes
FREE WATER: 0 cc
TAIL CEMENT TYPE: CLASS G
ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + 1.0 ghs FP-6L
WEIGHT: 15.8 ppg
APPROX. # SACKS: 185
FLUID LOSS: 100-150 cc/30 minutes
YIELD: 1.14 ft3/sx
MIX WATER: 4.85 gps
THICKENING TIME: 3-1/2 to 4-1/2 hrs
FREE WATER: 0 cc
CENTRALIZER PLACEMENT:
1. Run 1 straight blade rigid centralizer per joint from TD to 500' MD above Sag River.
2. Run 1 straight blade rigid centralizer every joint 300' above and below the Ugnu.
OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacedmud program and ensure compatibility prior to
pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix the lead
and tail slurries on the fly.
CEMENT VOLUME:
1. Lead slurry to 3186' MD (500' above Ugnu) with 50% excess
2. Tail slurry to 8753' MD (1000' above Sag River) with 50% excess
3. 80' MD 7" 26# capacity for float joints.
Note: Hydrocarbon bearing zones are identified in the Ugnu, Kuparuk and Sag River intervals.
z-03 Permit Info Page 5
4-1/2" LINER CEMENT PROGRAM
CIRC. TEMP: 140° F
PREFLUSH: 20 bbls fresh water
SPACER: 50 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight
BHST: 235° F at 8800' TVDss
CEMENT TYPE: CLASS G
ADDITIVES: 175 ghs BA-86L + 2% A-9 + 0.6% CD-32 + 0.3% FL-33 + 0.2% A-2 + 0.5% gel + 1 ghs FP-6L
WEIGHT: 15.7 ppg YIELD: 1.19ft3/sx MIX WATER: 3.43gps
APPROX. # SACKS: 105 THICKENING TIME: 45 min. @ Surface + 3-4 hr. @ 140°F
FLUID LOSS: less than 50 cc/30 minutes @ 140°F FREE WATER: 0 cc at 45° angle.
CENTRALIZER PLACEMENT:
1. Run 2 right hand turbolators per joint in open hole,
2. Run 1 right hand turbulator per joint in lap, and none opposite intermediate casing shoe..
OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss
should be 50 cc/30 min. or less. Report actual fluid loss on morning report. Displace @ 6-8 bpm.
LINER CEMENT VOLUME:
1. Open hole (6" X 4-1/2") + 40% excess (adjust if a caliper log is run and it indicates severe washouts).
2. 4-1/2", 12.6# casing capacity below landing collar (80').
3. 150' liner lap
Z-03 Permit Info Page 6
ii1~1
[ ...... SHAREB SERVZCES DRZLLTNG
, .. . ....... Z-OB (PS)
VERTICAL SECTION VIEW
60o 8 '- Section at: ~41,0~
TvD Sca~e.' ! inch = ~200 feet
c-- Oep Scale' ! inch = ~200
t200 "' - '
Ora~n · 27 Jun ~997
, , ,
,~oo .... ~ .............. ~,~~,~_~ Anadri ]] Schlumberger
2 M~r~er Identification MD BKB SECTN IN~LN
~400 ~) KB 0 0 0 0.00
B} NUDGE BUILD t/tO0 600 600 -0 0.00
C] END t/t00 BUILD ]000 1000 12 4.00
3000 ' " D) DROP 1/100 t400 1399 37 ~,00
d ~'.. E) END 1/t00 DROP 1800 1798 ~9 0.00
K~ F) KOP / BUILD i/lO0 2000 tg98 4g 0,00
G) BUILD 1.5/~00 2100 20gB 50
3600 ~ . H) BUILD 2/t00 2200 2rgb 52 ~.50
I) BUILD ~.5/100 2300 2298 58 4,50
~ J) g-5/8' CSG PT <mm > 3t~4 3084 255 24.22
~200 K) END ~,5/i00 3465 3391 422 32,95
L) OflOP B/lO0 gOOa 8039 3435 32.95
M) END 8/$00 DROP 9416 8429 3550 0.00
480o . ~ - N) 7' CSG PT <11 > 9754 8767 3550 0.00
....... O] TARGET w*~*~w**w* 9886 8899 3550 0.00
.
~ P) 4-t~' LNR PT <Il > lOlBB 920t 3550 0.00
' ~) ~O iOlBB 9~Ot 3550 0.00
5400 m
6000 · ~ ~~_
~ - A~k-DPC
....... APP
FO~ PE tMll'TIN'~
Ak !! ~ ,. ,
7eoo ~ ~ l
7800 ~ _
8400 -: - - · - H '
-~~ ~ = .~. =...,.... :., = =.,., ,,, .. ~,,,. ,,,.,..,, ..... ,....,
~.'~' .., ..................... ~ _Z~,~d~: ~5~J ....
,
10800
0 600 t200 tBO0 ~ ~400 3000 3~0 4200 4600 5400 6000 6500 7200 7600
Sectkon Depac[uPe .
mm m
i ~ ·
i ii
c_ SHARED SERV ICI- S DRILL I NG
Mar, kee Tdent ~ t~Lcat ~an MD ~/S E/W Z--03 (P5)
~) KB 0 0 N 0 E
.) .u~ ~u~o u~oo ~oo o. o ~ ~ PLAN VIEW
E) END ~/tO00ROP t~O0 55 S tO E CLOSURE ' 3550 feet at Azimuth ~4~.02
F) KOP / BUILD 1/100 8000 55 S 10 E DECLINATION ' +28.084
BUILD 1.5/t00 2100 58 S t0 E
~ BUILD ~/~oo 2200 59 S ~0. E ,SCALE ' 1 inch = 500~eet
I) BUILD E.5/t00 2300 ~5 S 1~ E
J) ~-5/8' CSG PT <i1> 3~1a 22B S ~ E DRAWN ...... ' 27 Jun 1997
K) END 2,5/~0~ ~465 3~9 S E27 E
L) 0~0~ SilO0 ~00~ 267] S 2~5~ E , ,,
m ~.o u~ooo~oP 9~m ~os ~a~ '
m 7' CSG P~ <~> ~7~ eT~O S ~ ~. AnadrJ]] Soh]umberger
O) TARGET m~*~m~m~ ~886 2760 S 2233 E _ , ,
P) 4-~q2" LNR PT <1~> -101B8 2760 S ~233 E ,.
~ 2~ T~ tO~Dg~,~'~s :~3 E
-- 0 i- J
-. ~NADI ',ILk'
~ ~o
X~ AF,PRO'/.ED
- , ONL~
_.
i .
.
.
.
~00 .- ~ . ~. "
. .
' .. ·
JSO0 ' ~ '
~75~ ': '"
2000 : ' ' ~ ' '
2500_ ,, .' ~r~_(Radius 150 fee )
,
3000 -"
3250 .
25o 0 ~50 500 750 1000 J250 ~500 1750 2000 2250 2500 2750 3000 3250
<- WEST · EAST ->
i i
(~nedrJll (c)97 ZO3PS 3.0C c ~9 PM PI
AnadriLL Schlumberger
Alaska District
111l HaBt 80~h Avenue
Anchorage, 11/( 99518
[907) 349-'4511 Fax 344-2160
D£R~CTIONAL WHLL ?LP~ for SKAR~D BHRVICK5 DRILB£NG
well ......... : Z-03 (PS)
Field ........ : Prudhoe Bay, Z-Pad
Computation..: Minimum CurvattLre
Units ........ ~ FEHT
Surface Lat..: 90.29770070 N
Surface ~onc3.: 149,19705946 W
Legal Description
Surface ...... : 4304 PSL 3527 FEL
Target ....... : 1543 FSL L305 FEL
BHL .......... : 1543 ~SL L305 FEL
LOCATIONS - A/J~S~ Zone: 4
X-Coord X~Coord
519 Tl114 RL2E U M 599IS0,99 5959099.96
819 TllN RL2~ UM 601420.00 59563q0.O0
819 ~11N R12E UM 601420,00 59563~0.O0
PROPO~ED ~L/~ PROF.IL~
~TATIO~ ~U~D I~
msmm mm mmm~;:~ :~mu mmm mmmmmmmm ~ :~
~ 0.00 .0.00
~03LV 3/~oo ~o.oo 0.00
~. 700.00 L.O0
~;, 800. O0 2.00
~,. '~ 900.00 3.00
....
~ ,~ ....
I00'BUI5D : ..... ~, 1000.00
~ ~ 1500.00 3.00
~ c~ "'~-'~ 1600.00 2.00
~==mmmmmm mmmmmmmmm==:~=:~
DIRECTION ¥~RTICAL-DBPTH~
AZIMUTH TVD SUB-S~A
0.00 0.00
170.00 600.00 516.25
170.00 699.99
170.00 ~99.96 716.21
170.00 899.85 816.11
170.00 999.68 9L5.93
1'70.00 1398.70 1314.95
1';0.00 1498.51 1414.76
170-00 /598.42 1514
IT0.00 1698.38 16£4.63
LT0.00 1798. $8 1714.63
L?0.00 L883-75 1800.00
Prepared ..... ~ 27 Jun 1997
Vert sect az.: 141-02
KB elevation., 83.~5 it
Magnetic Dcln: +28.084 (H)
ScaLe Paetor.~ 0.9999111?
Convergence..: ,0.75593964
ANADRILL
AKA-DPC
APPROVED
FOR PERMITTING
ONLY
PLAN
-___ ,,
Isssmmmm mmmm=~a:==~mlsmlmmlm~ m;:~::amssmmmmsmmmmm
SHCTION OOORD£HATHS-Eq~OM ALASKA Zone 4
DRPART W]~L~HAD X Y
0.00 0.00 N 0.00 ~ 599150.99 5959099.96
-0.00 0.00 N 0.00 B 599150.99 S95909~.96
0,76 0.86 8 O.Z5 B 599151.15 5959099.L0
3.05
TOOL DS/
FACE 100
Lg0R O.00
170R 0.00
~90R 1.00
3.4~ ~ 0.61 E 599151-64 S959096.53' ~?0R 1.00
~.73 8 L.$6 g 599152.46 5959092.25 ~OR L.00
12.21 13.76 S 2.42 E 599153.59 5959086.25 170R 1,00
36.62 41-22 S 7.27 H 599158.80 5959056.84 170R 0.00
4L.96 47.24 S 8.33 8 599159.94 5959052.84 170R 1.00
45.78 51.52 S 9-09 H 599~60.75 5959048.56 I~0R
1.00
48.09 54.11 S 9.5i H 599161.24 5959045.99 170R 1.00
46.83 54,97.S 9.69 H 599161.41 5959045.13 170R 1.00
48.83 ~4.97 S 9.69 H 599161.4£ 5959045.13 I?0R 0.OD
I'rl
(Anadrlll (e)97 Z03P5 '3.0C 1:16 PN P)
STATION
IDHFCIFIC/TION
KOP / BU£1~D i/100
BUILD /.5/L00
Bu£~ 2/~00
8UXY~ 2,5/L00
PROPO~RDWBbb PR0eI~A
N~UR~D [~CI.~
2000.00 0.O0
2[00-00 1.00
2200,00 2.~0
2300.00 4.50
2400.00 6.72
{mmmmmmmmmllm
D£RECTION YERTICAL-DHPTI~S
AZIMUTH TVD $1R3-SEA
170,00 1998,38 1914.63
170,00 2098,3T 201~,62
170,00 2L98,32 2L1%,$7
170,00 2298,~3 2214,38
158,03 2397,65 2313,90
'2500.00 9.09
2~00.00 11.5l
2700.00 13.96
2800.00 16.43
2900.00 18.90
152,11 2496,69 2412,94
148,65 2595.07 2511.32
£46,38 2692,61 2608,86
~44,~8 2789.30 2705,35
L43.59 2884.38 2800.63
SECTIO~
DEPART
48,83
49.59
52.26
57.60
66.64
79.99
97.63
~39.54
145.66
175.96
27 Jun 1997 Page 2
COORD£NATHS-FROM ALASKA goue 4 9OOL DL/
9(H~bSHAD X Y P~ 10O
54,97 S 9,69 ~ 599161,4L 5959045,~3 [70R 0,00
55.63 S 9.84 H 599161,5g 5959044,27 ~70R L.0O
S8.84 S 10.3~ g ~99162.L4 59S9041.27 ~70R L.~0
~4-8S ~ 1L.4~ & 59916~.28 S95903S.28 168R 2.00
~%.14 ~ 14-~ E 599L66.27 S9S9026.02 22L 2-S0
86.55 S 20.~9 H 599L72,32 5959013.69 16L 2.50
L02.06 S 29.08 ~ 599183.41 5958998,3L 13b 2.SO
L20,63 S 40,95 B 599L93.53 5958979,89 LOb 2.50
/42.23 S 55.79 H 599208.65 5958958-49 9b 2.S0
166.82 S 93,56 H 599226.74 5958934-L4 8b 2.50
9-s/8. cs~ p~: <Il>
E~O 2.5/~00
O~ 8/~oo
END 8/LO0 DROP
8KU33LI K
3000.00 21.38
3LO0,O0 23.86
3L1~.45 24.22
3200,00 26.35
3300.00 28.84
3400,00 31.33
3465,14 32.95
9004,06 32.95
9LO0.O0 25.28
9200.00 17.28
9300,00 9,28
9400,00 1.28
94L5.98 0.00
97L5.98 O.OO
9744.98 0.00
7" CS~ PT <JJ> 9753.98 0.00
TAR~HT *~*****"***~ 9885.98 0.00
T~AD 9585,98 0.00
(A~adrilL (c997 Z03P5 3,0C L:16 ~ P)
L42.66 2978.26 2694.51
L4~.92 3090.56 2986.8~
L41.83 3083.75 3000.GO
L41.32 3~61.10 $077.35
L40.81 3249.~2 3165,9~
210.36
248.82
254.70
291.24
33~.56
L40.37 3336.24 3252.~9 38~.68
L40.12 3391.39 3307.64 422.34
L40.12 8039.1~ 99S5.42 3434.90
L40.12 8122,92 8039,17 3481,54
L40,12 8216,03 8132,28 3~1~,80
194,35 8 94,23 R 599247,77 5958906,89 ?b 2,50
224,~7 8 LL?.,77 B 599271,70 5958876,78 6L 2,50
229,40 ~ £2~.40 ~ 599275.40 5958872,20 6~ 2,50
2~8,03 ~ £44.12 H 599298,49 5958843,88 6~ 2,50
294.05 S £73.2~ H 599328.08 5958808.25 5~ 2.50
332,79 S 205,07 H 599360,4L 5958769.95 5L 2,50
359.41 B 229.23 H 599382,92 5958743.61 H9 2.50
2671.45 S 2~59.11 H 601344,96 595645?.43 LS 0,00
2707.28 8 2~89.02 H 601375,34 5956422.04 L8 8,00
2935,L0 8 2212.27 H 601398,95 5956394,52 ~g 8,00
L40.12 8313.28 8229.53 3540.75 2~$2.T1 S
L40.12 8412.77 8329.02 3549.94 2759,77 S
[40.12 8428.75 8345.00 3550.L2 2759.90 S
L40.12 8728,q5 8645.00 3550.12 2769.90 S
L40,12 8757.75 8674,00 ~550,L2 2759,90 S
3550. L2
3550.12
3550. L2
L40.12 8966.95 8683.00
L40.12 8898.75 88L5.00
L40.12 8898.75 88£5.00
2759-90 S
2V59.90 S
27S9.90 S
2226,99 H 601413,90 5956379,11
2232.88 B 601419,88 5956370.14 240R
2232.99 E 601420.00 5956~70.00
2232.99 ~ 601420,00 59S6370.00
2232.99 ~ 601420,00 $956370.00
2232.99 E 601420.00 59563?0,00
2232.99 E 601420-00 S956370,00
2232.99 g 6G1420.00 5956370.00
ANADRILL
8.00
8.00
8.00
140R 0,00
140R 0.00
140R O-OO
14fir 0.00
140R 0,00
AKA-DPC
APPROVED
FOR PERMITTING
ONLY
ITl
PROPOSED ~ELL PEOPILH
DZRHCT£ON 3/HRT I CAr. - DB[~THS
AZX~H T~
L40 . 12 90~0.75 896~ .0O
140 ,12 9076.7~ 8993 .00
140,L2 9200.75 9117.00
~40.12 9200.75 g117.00
27 Jun 1997
======um mmmmmmmmn=~=
$ ECT~ ON COORDiNATeS- F~O~4
DEPART WHLLHHAD
3650.~2 2759.90 S 2232.99
3550.~2 2759.9O S 2232.99
3550.]2 2759.90 S 2231.99
~5~0.12 2759.90 S 2232.99
ALASKA ~¢Le 4 TOOL DL/
X Y FAC~ 100
m~mmJmmm~ mu]mmma=~= ;
601420.00 6956370.00 140R 0.00
601420.00 5956370.00 ~40R 0.O0
60L420.00 5956370.00 0.00
601420.00 5956370.00 0.00
ANADRILL AKA-DPC
APPROVED
FOR PERMITTING
ONLY.
PLAN # 5-
(Aaadrill (c]97 ZO3P5 3.0C ~:16 PM g)
H124013
06/17/971 00124013
. VENDOR
DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT
061697
HANDL
CK061697C
INQ INST: s/h
THE ATt'ACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
teeeie hubbl
e x 4628
100.00
AlASKAST14 OO
NET
100.00
WELL PERMIT CHECKLISToo. .Y
GEOL AREA
PROGRAM: exp~q dev~redrl[1 servO wellbore segD ann disp para reqD
ADMINISTRATION
1. Permit fee attached ................... ~Y
2. Lease number appropriate ................
3. Unique well name and number ............... ~Y
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundary.. %Y
6. Well located proper distance from other wells ...... IY
7. Sufficient acreage available in drilling unit ......
8. If deviated, is wellbore plat included .........
9. Operator only affected party ..............
10. Operator has appropriate bond in force .........
11. Permit can be issued without conservation order ..... ~Y
12. Permit can be issued without administrative approval.. ~Y
13. Can permit be approved before 15-day wait ........
ENGINEERING
14. Conductor string provided ............... ~ N
15. Surface casing protects all known USDWs ........ ~ N
16. CMT vol adequate to circulate on conductor & surf csg..~ N
17. CMT vol adequate to tie-in long string to surf csg . . . Y ~
18. CMT will cover all known productive horizons ...... ~ N
19. Casing designs adequate for C, T, B & permafrost .... ~ N
20. Adequate tankage or reserve pit .............. (v'3 N
21. If a re-drill, has a 10-403 for abndnmnt been approved..~ N
22. Adequate wellbore separation proposed .......... ~
23. If diverter required, is it adequate .......... ~
24. Drilling fluid program schematic & equip list adequate .~ N
25. BOPEs adequate ..................... ~ N
26. BOPE press rating adequate; test to ~ psig.~ N
27. Choke manifold complies w/API RP-53 (May 84) ...... ~ N
28. Work will occur without operation shutdown ....... ~ N
29. Is presence of H2S gas probable ............ O N
GEOLOGY
/
30. Permit can be issued w/o hydrogen sulfide measures .... Y N// _
31. Seismic analysis of shallow gas zones .......... ~--N ~_,~~
Data presented on potential overpressure zones ..... Y/N
32.
33. Seabed condition survey (if off-shore) ........ / Y N ' - ' ~
34. Contact name/phone for weekly progress reports . . . / . Y N [ exploratory only]
REMARKS
GEOLOGY: ENGINEERING: COMMISSION:
Comments/Instructions:
HOWldlf- A:\FORMS\cheklist rev 01/97
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
~ LIS READ ~
(NOTE: MAXIMUM RECORD LENGTH - 8192 BYTES)
~ REEL HEADER ~ REEL SEQUENCE
SERVICE NAME: NUMAR
DATE: 97/12/12
ORIGIN OF DATA:
REEL N~ME: BP
CONTINUATION ~: 01
PREVIOUS REEL N~v~E:
COP~iENTS: PETROLEUM COMPUTING ]~C ~S FO~>~T
SERVICE NAME: NUi~iAR
DATE: 97 / 12 / 12
ORiGiN OF DATA:
TAPE NAME: BP
CONTINUATION #: 0i
PREVIOUS TAPE NAME:
COPhMENTS: PETROLEUM COlv~UTiNG INC.-
END OF FiLE (EOF # 1) ~~~
FiLE HEADER x~ FiLE SEQUENCE # i
~'iLE NAM~E: NUPiAR
SERVICE NA~E: N UMkAR
VERSION #: REV i.0i
DATE: 97/12/12
FILE TYPE:
PREVIOUS FILE NAME:
~ iNFOrMATION RECORD
MNEM CONTENTS
CN BP EXPLORATiON(ALASKA), INC.
WN Z-03
FN PRUDHOE BAY
FL 976~ SNL & i427~ EWL
STAT ALASKA
COUN NORTH SLOPE
CTRY USA
SECT 19
TOWN lin
RANG i2E
APiN 50-029-22787
DATA FO~v~T SPECi~'±CATiON ~
ENTRY BLOCKS
TYPE SiZE REP CODE ENTRY
3 2 79 184
4 1 66 255
8 4 68 .50
9 4 65 FT
1i 2 79 5
12 4 68 -999.25
16 i 66 0
0 i 66
DESCRiPTiON
DATA FRA~¢~ SiZE (BYTES)
LOG DiRECTiON, DOWN
DATA FRAME SPACING
UNITS OF DATA FRAME SPACING
~XiMUM FRAMES / DATA RECORD
ABSENT VALUE
SPECiFiCATiON BLOCK SUB-TYPE
TERMINATOR (NO MORE ENTRIES)
DATUM SPECiFiCATiON BLOCKS
NAME SERVICE SERVICE UNiT APi APi APi APi FiLE SZE PROC SPL REPR
iD ORDER# LOG TYP CLS MOD NO. LVL CODE
DEPT FT 0 0 0 0 i 4 0 i 68
~AMM cps 0 0 0 0 1 4 0 i 68
MBVI pu 0 0 0 0 1 4 0 i 68
MFFI pu 0 0 0 0 1 4 0 i 68
MPHI pu 0 0 0 0 i 4 0 i 68
Pi pu 0 0 0 0 1 4 0 1 68
P2 pu 0 0 0 0 i 4 0 1 6S
P3 pu 0 0 0 0 1 4 0 i 68
P4 pu 0 0 0 0 1 4 0 i 6B
P5 pu 0 0 0 0 1 4 0 i 6~
P6 pu 0 0 0 0 i 4 0 i 68
P7 pu 0 0 0 0 1 4 0 1 6~
P8 pu 0 0 0 0 i 4 0 i 68
P9 pu 0 0 0 0 i 4 0 i 68
SBVi pu 0 0 0 0 i 4 0 i 68
PiPR 0 0 0 0 i 4 0 1 68
P2PR 0 0 0 0 i 4 0 i 68
P3PR 0 0 0 0 i 4 0 i 68
MCBW pu 0 0 0 0 i 4 0 i 68
MSiG pu 0 0 0 0 1 4 0 i 68
WQ 0 0 0 0 1 4 0 i 68
WI 0 0 0 0 i 4 0 i 68
ww 0 0 0 0 i 4 0 i 68
B~-WE DEC 0 0 0 0 i 4 0 i 68
SWBM DEC 0 0 0 0 i 4 0 i 68
MFFi DEC 0 0 0 0 i 4 0 i 68
PMRi MD 0 0 0 0 i 4 0 i 68
BiNi PU 0 0 0 0 i 4 0 i 68
BiN2 PU 0 0 0 0 i 4 0 i 68
BiN3 PU 0 0 0 0 i 4 0 i 68
BIN4 PU 0 0 0 0 1 4 0 1 68
BIN5 PU 0 0 0 0 i 4 0 i 68
BiN6 PU 0 0 0 0 i 4 0 i 68
BiN7 PU 0 0 0 0 i 4 0 1 68
BiN8 PU 0 0 0 0 i 4 0 i 68
BiN9 PU 0 0 0 0 i 4 0 i 68
MPRM 0 0 0 0 i 4 0 i 68
P25 0 0 0 0 1 4 0 i 68
P35 0 0 0 0 i 4 0 1 68
P45 0 0 0 0 1 4 0 1 68
P55 0 0 0 0 1 4 0 1 68
P65 0 0 0 0 1 4 0 1 68
P75 0 0 0 0 i 4 0 i 68
P85 0 0 0 0 i 4 0 i 68
P95 0 0 0 0 i 4 0 1 68
DATA FO~AT SPECiFiCATiON
ENTRY BLOCKS
TYPE SiZE REP CODE
3 2 79
4 i 66
8 4 68
9 4 65
il 2 79
12 4 68
16 i 66
0 i 66
ENTRY
184
255
.50
5
-999.25
0
DESCRiPTiON
DATA FRAME SIZE (BYTES)
LOG DiRECTiON, DOWN
DATA FRAME SPACING
UNITS OF DATA FRA~iE SPACING
i¢~XiMUM FRA~ES / DATA RECORD
ABSENT VALUE
SPECiFiCATION BLOCK SUB-TYPE
TE~viiNATOR (NO MORE ENTRIES)
DATUM SPECIFiCATiON BLOCKS
N~E SEkv±u~ ~viCE UNiT APi APi AP± au± FiLE SZE PROC SPL ~PR
ID ORDER# LOG TYP CLS MOD NO. LVL CODE
DEPT FT 0 0 0 0 i 4 0 i 68
G~¢nwi cps 0 0 0 0 i 4 0 i 68
MBVi pu 0 0 0 0 i 4 0 1 68
MFFI pu 0 0 0 0 i 4 0 i 68
MPHi pu 0 0 0 0 i 4 0 i 68
Pi pu 0 0 0 0 i 4 0 i 68
P2 pu 0 0 0 0 i 4 0 i 68
P3
P4
P5
P6
P7
P8
P9
SBVi
P1PR
P2PR
P3PR
MCBW
MSIG
WQ
Wi
W-W
BVWE
SWBM
MFFi
PMRI
BiNi
BiN2
BiN3
BiN4
BIN5
BiN6
BiN7
BiN8
BiN9
MP Pa~I
Pi5
P25
P35
P45
P55
P65
P75
pu
pu
pu
pu
pu
pu
pu
pu
pu
pu
DEC
DEC
DEC
MD
PU
PU
PU
PU
PU
PU
PU
PU
PU
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
i
i
i
i
i
i
i
i
i
1
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
i
i
i
i
i
i
i
i
i
i
1
i
1
i
i
i
1
i
i
1
1
i
i
i
i
i
i
i
i
i
i
1
i
i
i
i
1
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
O~
68
68
68
68
68
68
68
68
68
68
68
68
68
68
P95 0 0 0 0 i 4 0 i 68
Num. DATA
RECORDS
281
START
DEPTH
9608.000
END DEPTH
DEPTH INCREMENT
10308.000 FT .5000
FiLE TRAILER~
FiLE N~ME: NUMAR
SERVICE NAME: NUMAR
VERSION #: REV i.0i
DATE: 97/12/12
MAX. RECORD LENGTH:
FiLE TYPE:
NEXT FiLE N~ME:
1024
TAPE TRAILER~
SERVICE NAME: NUMAR
DATE: 97/12/12
ORIGIN OF DATA:
TAPE NAME: BP
CONTiNUATiON #: 0i
NEXT TAPE NAME:
CO~ENTS: PETROLEUM COMPUTING iNC.- LiS FO~T
REEL TRAILER
SERVICE NAME: NUMAR
DATE: 97/12/12
ORIGIN OF DATA:
REEL N~ME: BP
CONTiNUATiON #: 0i
NEXT REEL N~ME:
COPhMENTS: PETROLEUM COP~UTiNG iNC.- LiS FO~T
TAPE TErMiNATED BY REEL TRAILER
* ALASKA COMPUTING CENTER *
....... SCHLUMBERGER .......
COMPANY NAME : BP EXPLORATION (ALASKA)
WELL NAM~ : Z-03
FIELD NAI~E : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API iFUFI~ER : 50-029-22787-00
REFERENCE NO : 97462
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
9-0CT-1997 11:5~
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 97/10/ 9
ORIGIN : FLIC
REEL NAME : 97462
CONTINUATION # :
PREVIOUS REEL :
CO~ViENT : B.P. EXPLORATION, PRUDHOE BAY Z-03, API #50-029-22787-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/10/ 9
ORIGIN : FLIC
TAPE NA24E : 97462
CONTINUATION # : 1
PREVIOUS TAPE
COFk~_JVT : B.P. EXPLORATION, PRUDHOE BAY Z-03, API #50-029-22787-00
TAPE HEADER
PRUDHOE BAY
MWD/MADLOGS
WELL NAME:
API AUJPIBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
Z-03
500292278700
BP EXPLORATION (ALASKA)
SCHLUMBERGER WELL SERVICES
9-0CT-97
BIT RUN 1
97462
KUNTZ /NUTTER
COPEN
BIT RUN 2 BIT RUN 3
19
llN
12E
976
1427
83.75
82.25
29. O0
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 9.625 3104.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
9-0CT-1997 11:51
3RD STRING
PRODUCTION STRING
THIS FILE CONTAINS THE LDWGEDIT FOR Z-03 MWD GR. THE
GR WAS DEPTH SHIFTED TO THE OPEN HOLE SWS BHC GR LOGGED
20-SEP-97.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/ 9
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 1
EDITED MERGEDMWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREFiENT: 0.5000
FILE SUFmD%RY
LDWG TOOL CODE
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH STOP DEPTH
3100.0 9652.0
BASELINE DEPTH
88888.0
6916.0
6897.0
6842.0
6806.0
6746.0
6725.0
6707.0
6673.5
6649.5
6580.5
6531.5
6516.5
6479.5
6418.5
6373.0
6312.5
6270.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
MWD
88881.0
6909.0
6891.0
6836.0
6800.0
6739.5
6717.5
6700.0
6666.5
6643.5
6573.0
6521.5
6506.5
6469.5
6408.5
6362.5
6302.5
6259.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
6228.5
6204.5
6154.0
6127.0
6087.5
6035.0
5987.5
5926.5
5875.0
5765.0
5704.0
5667.0
5585.0
5560.0
5504.5
5479.0
5424.0
5373.0
5307.0
5281.0
5253.5
5214.0
5167.5
5113.5
5073.5
5013.5
4958.5
4890.5
4859.0
4788.5
4759.0
4719.5
4696.0
4634.5
4602.0
4579.0
4528.0
4497.0
4480.5
4354.0
4299.0
4250.5
4193.5
4171.5
4103.5
4070.0
4009.5
3960.5
3919.0
3862.5
3846.5
3782.0
3746.5
3724.0
3690.0
6217.5
6194.0
6143.5
6116.0
6077.0
6024.0
5976.0
5915.5
5864.5
5754.0
5692.0
5655.5
5572.5
5548.0
5491.5
5466.0
5411 5
53 60 0
5294 5
5268 5
5240 5
5201 0
5155.0
5101.0
5059.0
5000.5
4944.5
4877.5
4846.5
4776.5
4746.0
4706.0
4682.0
4621.5
4590.0
4565.5
4515.0
4484.0
4466.5
4340.5
4287.0
4238.5
4180.0
4159.5
4091.5
4056.5
3998.0
3948.5
3906.0
3850.0
3833.5
3770.0
3734.0
3711.5
3677.0
9-0CT-1997 11:5~
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
9-0CT-1997 11:5~
PAGE:
3663.0
3647.0
3604.0
3565.0
3523.5
3473.0
3436.5
3417.0
3397.5
3298.5
3214.5
3149.5
100.0
$
~iERGED DATA SOURCE
LDWG TOOL CODE
..............
$
REMARKS:
3650.0
3634.0
3592.0
3552.5
3511.0
3460.0
3424.5
3403.5
3384.0
3286.5
3201.0
3136.0
86.5
BIT RUN NO. MERGE TOP MERGE BASE
THIS FILE CONTAINS THE EDITED AND CLIPPED FILE FOR
MWDREAL TIME GR RUN20-SEP-1997.
$
LIS FORMAT DATA
** DATA FO~T SPECIFICATION RECORD **
** SET TYPE - 64EB * *
TYPE REPR CODE VALUE
1
2
3
4 66
5 66
6 73
7 65
8 68
9 65
11 66
12 68
13 66
14 65
15 66
16 66
0 66
66 0
66 0
73 20
1
0.5
FT
51
0
FT
68
1
0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
9-0CT-1997 11:5i
PAGE:
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000
GRRWMWD AAPI O0 000 O0 0 1 1 1 4 68 0000000000
GRIN MWD AAPI O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD FPHR O0 000 O0 0 1 1 1 4 68 0000000000
GR BHC GAPI O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 10147.000
GR.BHC 41.389
DEPT. 3104.000
GR.BHC 71.002
GRRW.MWD -999.250 GRIN. MWD -999.250 ROP.MWD
GRRW. MWD -999.250 GRIN. MWD -999.250 ROP.MWD
-999.250
-999.250
** END OF DATA
**** FILE TRAILER ****
FILE NA2ViE : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/ 9
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE · 97/10/ 9
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: 0.5000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
9-0CT-1997 11 ..Sx
PAGE:
FILE SUI~VARY
VENDOR TOOL CODE START DEPTH
MWD 3100.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9652.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAR~iA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OBI~M) AT TEMPERATURE (DEGF) :
MUD AT $4EASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20-SEP-97
IDEAL 2. OA- 010
4.0C
REAL- TIME
9713.0
3100.0
9713.0
34.0
TOOL NUMBER
MWD GR
8.500
3104.0
LSND
52.0
WARNING: DEPTH REFERENCE MAY NOT BE FINAL DEPTH
REFERENCE: FINAL DEPTH MAY BE SHIFTED TO WL REF.
DATA GAP BETWEEN 4385 ?T AND 4466 FT DUE TO SURFACE
SYSTEM FAILURE.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
9-0CT-1997 11:5~
PAGE:
NO REPEAT SECTION WAS DONE BECAUSE JUDGED UNNECESSARY.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000
GR MWD AAPI O0 000 O0 0 2 1 1 4 68 0000000000
GR INT AAPI O0 000 O0 0 2 1 1 4 68 0000000000
ROPSMWD F/HR O0 000 O0 0 2 1 1 4 68 0000000000
ROP5 INT F/HR O0 000 O0 0 2 1 1 4 68 0000000000
VDEPMWD FT O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 9713.500 GR.MWD -999.250
ROPS.INT 75.330 VDEP.MWD 8737.711
DEPT. 3106.500 GR.MWD -999.250
ROPS.INT -999.250 VDEP.MWD -999.250
GR.INT -999.250 ROPS.MWD 75.330
GR.INT 70.900 ROPS.MWD -999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
9-0CT-1997 11:5~
PAGE:
** END OF DATA **
**** FILE TRAILER ****
FILE NA~E : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/ 9
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAM~ : EDIT
DATE : 97/10/ 9
ORIGIN : FLIC
TAPE NA~4~ : 97462
CONTINUATION # : 1
PREVIOUS TAPE :
COf~4~f : B.P. EXPLORATION, PRUDHOE BAY Z-03, API #50-029-22787-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 97/10/ 9
ORIGIN : FLIC
REEL NA~E : 97462
CONTINUATION # :
PREVIOUS REEL :
COf4~_~Ff : B.P. EXPLORATION, PRUDHOE BAY Z-03, API #50-029-22787-00
2GGL 9 L 130
I£1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14~0CT-1997 16:13
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 97/10/14
ORIGIN · FLIC
REEL NAMi~ : 97450
CONTINUATION # :
PREVIOUS REEL :
CO~4ENT : BP EXPLORATION, PRUDHOE BAY, Z-03, 50-029-22787-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/10/14
ORIGIN : FLIC
TAPE NAM~ : 97450
CONTINUATION # : 1
PREVIOUS TAPE :
COMPiENT : BP EXPLORATION, PRUDHOE BAY, Z-03, 50-029-22787-00
TAPE HEADER
Prudhoe Bay
CASED HOLE WIRELINE LOGS
WELL NA~E: Z-03
API NUMBER: 500292278700
OPERATOR: BP Exploration
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 14-0CT-97
JOB NUMBER: 97450
LOGGING ENGINEER: E. BARTZ
OPERATOR WITNESS: M. JACKSON
SURFACE LOCATION
SECTION: 19
TOWNSHIP: 1 iN
RANGE: 12E
FNL: 976
FSL :
FEL:
FWL: 1427
ELEVATION (FT FROM MSL O)
KELLY BUSHING: 83.75
DERRICK FLOOR: 82.25
GROUND LEVEL: 29. O0
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 8.500 7. 000 9700.0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1997 16:13
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: MWD
LDWG CURVE CODE: GR
RUN NUMBER: 1
PASS NUMBER: 1
DATE LOGGED: 20-SEP-97
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
BASELINE DEPTH
88888.0
7591.5
7570.5
7545.0
7500.0
7498.5
7484.0
7468.5
7440.5
7414.0
7409.0
7391.5
7390.5
73 68.5
73 62.0
7358.0
7347.5
7331.0
7330.0
7314.5
7301.5
7290.5
7287.5
7285.0
7275.0
7268.0
7240.5
7230.0
7210.0
7206.0
100.0
$
.......... EQUIVALENT UNSHIFTED DEPTH
GRCH RST
88880.5 88880.5
7584.0 7584.0
7563.0 7563.0
7536.0 7536.0
7491.5
7491.5
7475.5
7460.5 7460.0
7428.0
7406.0
7398.0
7381.5
7379.5
7362.0
7354.0
7349.5
7339.0
7324.5
7321.5
7307.0 7307.0
7294.0 7294.0
7285.0
7279.0
7277.5 7279.0
7269.5
7260.5 7261.0
7234.0
7222.5
7201.5
7198.5
92.5 91.5
CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE
SIGMA MODE RST DATA ACQUIRED ON BP EXPLORATIONS
Z-03 WELL. THE DEPTH SHIFT SHOWN ABOVE REFLECT
CORRELATIONS BETWEEN GRCH RST AND THE MWD GR, SIGM
RST AND THE MWD GR CARRYING ALL RST CURVES WITH
THE SIGM SHIFTS.
ONLY ONE SIGMA MODE RST PASS WAS ACQUIRED.
$
$
PAGB :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1997 16:13
PAGE:
**** FILE HEADER ****
FILE NA~E : EDIT .001
SERVICE : FLIC
VERSION ' O01CO1
DATE : 97/10/14
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUM~ER: 1
DEPTH INCREMENT: 0.5000
FILE SO?4M3~RY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 7616.0 7194.0
RST 7636.0 7223.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
.......... EQUIVALENT UNSHIFTED DEPTH ..........
BASELINE DEPTH GRCH RST
............................
$
REMARKS: THIS FILE CONTAINS THE ONLY RST SIGMA MODE PASS
MADE. NO PASS TO PASS TO SHIFTS WERE APPLIED
TO THIS DATA.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 80
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1997 16:13
PAGE:
TYPE REPR CODE VALUE
4 66 1
5 66
6 73
7 65
8 68 O.5
9 65 FT
11 66 12
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN**
NAME SERV UNIT SERVICE APIAPI API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
O0 000 O0 0 1 1 1 4 68 0000000000
DEPT FT 1022692
NBAC RST CPS 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
FBAC RST CPS 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
SBNA RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
SFNA RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
SBFA RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
SFFA RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
TRAT RST 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
IRAT RST 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
CIRNRST 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
CIRFRST 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
BSALRST PPK 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
SIBF RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
TPHI RST PU-S 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
SFFC RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
SFNC RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
SIGM RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
DSIG RST CU 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
TENS RST LB 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH RST API 1022692 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 7628.500 NBAC.RST 3735.281 FBAC.RST 3894.979 SBNA.RST
SFNA.RST 37.651 SBFA.RST 45.769 SFFA.RST 39.281 TRAT.RST
IRAT.RST 0.475 CIRN. RST 0.602 CIRF.RST 0.936 BSAL.RST
SIBF.RST 35.566 TPHI.RST 48.673 SFFC.RST 38.024 SFNC.RST
SIGM.RST 38.130 DSIG.RST -0.393 TENS.RST 2839.000 GRCH.RST
52.743
1.356
38.342
38.498
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1997 16:13
PAGE:
DEPT. 7186.500 NBAC.RST
SFNA.RST -999.250 SBFA.RST
IRAT.RST -999.250 CIRN. RST
SIBF.RST -999.250 TPHI.RST
SIGM. RST -999.250 DSIG.RST
-999.250 FBAC.RST
-999.250 SFFA.RST
-999.250 CIRF. RST
-999.250 SFFC.RST
-999.250 TENS.RST
-999.250
-999.250
-999.250
-999.250
-999.250
SBNA . RST
TRAT.RST
BSAL . RST
SFNC. RST
GRCH. RST
-999.250
-999.250
-999.250
-999.250
84.624
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/14
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/10/14
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 2
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMiBER: 1
DEPTH INCREME~VT: 0.5000
FILE SUF~VARY
VENDOR TOOL CODE START DEPTH
RST 7636.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
STOP DEPTH
7194.0
26-SEP-97
8C0-609
630 26-SEP-97
10187.0
7636.0
7194.0
7636.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14~0CT-1997 16:13
PAGE:
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAlEnA RAY
RST RESERVOIR SATURATION
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (?T)
LOGGERS CASING DEPTH (FT)
1800.0
NO
TOOL NUMBER
CGRS-A
RST-A
8.500
9700.0
9700.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
BRINE
8.50
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NEAR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS):
TOOL STANDOFF (IN): 1.0
RE~IARI<S: 1 SIGM PASS LOGGED @1800 FPH
4 IC PASSES LOGGED @240 FPH EA.
4 STATION LOGGING IC PASSES LOGGED FOR 9 MIN. EA.
STATION LOGS WERE TAKEN @ THE FOLLOWING DETECTOR
DEPTHS: 7460', 7506', 7537', & 7597'.
ALL LOGS TIED TO ANADRILL MWD GR LOG (20-SEP-97)
THIS FILE CONTAINS THE RAW DATA FOR THE ONLY
SIGMA MODE RST PASS MADE.
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1997 16:13
PAGE:
** DATA FORMAT SPECIFICATION RECORD
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 376
4 66 1
$ 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 2
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CS RST F/HR 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
TENS RST LB 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
NPHVRST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
NPDE RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
NSCE RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CRRARST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
NSCR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
AQTMRST S 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CHV RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CPSV RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CP2V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
Cl~2V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RCFR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RCLC RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RCRC RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RCAKRST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RTDF RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
FPHVRST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
FPDE RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
FSCE RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
FSCR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
AQTF RST S 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SF6P RST PSIG 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1997 16:13
PAGE: 8
NA~IE SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX)
HVPV RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
BMCU RST UA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
GDCU RST MA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
EXCU RST UA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
1VBEF RST UA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
?BEF RST UA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
NPGF RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
FPGF RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
BSTR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
BSPR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
MARC RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
~24V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
XPSV RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
XP2V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
~2V RST V 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RXFR RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RXLC RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
PO~C RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RXAKRST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SHCU RST MA 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
BSALRST PPK 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
BSAL SIG PPK 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CIRNRST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CIRF RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CIRNFIL 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CIRF FIL 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
DSIG RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
FBAC RST CPS 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
IRAT RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
IRAT FIL 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
I~BACRST CPS 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SFNA RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SFFA RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SBNA RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SBFA RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SFNA SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SFFA SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SBNA SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SBFA SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SFNA FIL CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SFFA FIL CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SBNA FIL CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SBFA FIL CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SIBF RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SFNC RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SFFC RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SIGM RST CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SIBF SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SIGM SIG CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SIGMR2P CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
SIBH R2P CU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1997 16:13
PAGE: 9
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE C~S MOD NUMB SAMP ELEM CODE (HEX)
TRAT RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
TRAT SIG 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
TRAT FIL 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CRNI RST K}tZ 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CRFI RST KHZ 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RDIX RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RSCS RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CTM RST DEGC 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
XTM RST DEGC 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
TAV RST ICV 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
FICU RST AMP 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
CACU RST AMP 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
BUST RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
BUSP RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
RSXS RST 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
TPHI RST PU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
TPHI SIG PU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
TPHI R2P PU 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
GR RST GAPI 1022692 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT.
NPDE.RST 1528.550 NSCE.RST
AQTM. RST
CM2V. RST
RCAK. RST
FSCE.RST
HVPV. RST
NBEF.RST
BSTR.RST
XPSV. RST
RXLC.RST
7650.000 CS.RST 1434.263 TENS.RST 2148.000 NPHV. RST 1550.294
2.836 CRRA.RST 2.111 NSCR.RST 0.092
0.661 CHV.RST 201.339 CPSV. RST 5.019 CP2V. RST 12.173
-12.211 RCFR.RST 0.000 RCLC.RST 0.000 RCRC.RST 0.000
0.000 RTDF.RST 0.000 FPHV. RST 1516.114 FPDE.RST 1507.989
2.685 FSCR.RST 0.077 AQTF. RST 0.661 SF6P.RST 143.677
169.190 BMCU. RST 36.035 GDCU. RST 59.848 EXCU. RST 15.090
22.203 FBEF.RST 46.876 NPGF. RST 0.994 FPGF.RST 1.004
20.157 BSPR.RST 1.140 MARC. RST 0.000 XHV. RST 198.674
5.117 XP2V. RST 12.187 X~2V. RST -12.466 RXFR.RST 0.000
0.000 RXRC.RST 0.000 RXAK. RST 0.000 SHCU. RST 30.243
BSAL.RST -999.250 BSAL.SIG -999.250 CIRN. RST -999.250 CIRF. RST -999.250
CIRN. FIL -999.250 CIRF. FIL -999.250 DSIG.RST -999 250 FBAC.RST -999.250
IRAT.RST -999.250 IRAT. FIL -999.250 NBAC.RST -999 250 SFNA.RST -999.250
SFFA.RST -999.250 SBNA.RST -999.250 SBFA.RST -999 250 SFNA.SIG -999.250
SFFA.SIG -999.250 SBNA.SIG -999.250 SBFA.SIG -999 250 SFNA.FIL -999.250
SFFA.FIL -999.250 SBNA.FIL -999.250 SBFA.FIL -999 250 SIBF. RST -999.250
SFNC.RST -999.250 SFFC.RST -999.250 SIGM. RST -999250 SIBF. SIG -999.250
SIGM. SIG -999.250 SIGM. R2P -999.250 SIBH.R2P -999.250 TRAT. RST -999.250
TRAT.SIG -999.250 TRAT. FIL -999.250 CRNI.RST 446.132 CRFI.RST 211.317
RDIX.RST 8191.000 RSCS.RST 8459.000 CTM. RST 64.941 XTM. RST 62.500
TAV. RST 94.888 FICU. RST 2.344 CACU. RST 2.778 BUST.RST 0.000
BUSP.RST 0.000 RSXS.RST 8878.000 TPHI.RST -999.250 TPHI.SIG -999.250
TPHI.R2P -999.250 GR.RST 47.105
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1997 16:13
PAGE: 10
DEPT.
NPDE. RST
AQTM. RST
CM2 V. RS T
RCAK. RST
FSCE. RST
HVPV. RST
NBEF. RST
BSTR . RST
XP5 V. RST
RXLC. RST
BSAL. RST
CIRN. FIL
IRA T. RS T
SFFA. RST
SFFA. SIG
SFFA. FIL
SFNC. RST
SIGM. SIG
TRAT. SIG
RDIX. RST
TA V. RST
BUSP. RST
TPHI.R2P
7193.500
1531. 678
O. 661
-12. 250
0 000
2 794
169 971
24 488
19 832
5 090
0 000
33 593
O. 696
0.497
39.242
0. 928
37. 872
36.414
O. 686
O. 029
21850. 000
94. 926
O. 000
51.229
CS.RST
NSCE. RST
CHV.RST
RCFR. RST
RTDF. RST
FSCR. RST
BMCU. RST
FBEF. RST
BSPR. RST
XP2V. RST
RXRC. RST
BSAL. SIG
CIRF. FIL
IRAT. FIL
SBNA . RST
SBNA. SIG
SBNA. FIL
SFFC. RST
SIGM. R2P
TRA T. FIL
RSCS. RST
FICU. RST
RSXS. RST
GR.RST
1771. 241 TENS. RST
2. 979 CRRA. RST
200. 854 CPSV. RST
O. 000 RCLC.RST
O. 000 FPHV. RST
O. 042 AQTF. RST
39. 824 GDCU. RST
50. 015 NPGF. RST
1. 153 MARC. RST
12. 221 3Q~2V. RST
O. 000 RXAK. RST
2. 734 CIRN. RST
1 . 051 DSIG. RST
O. 495 NBAC. RST
54 . 982 SBFA. RST
2. 749 SBFA. SIG
52. 554 SBFA. FIL
36. 419 SIGM. RST
35. 889 SIBH. R2P
1 . 334 CRNI. RST
8463 . 000 CTM. RST
2. 448 CACU. RST
8878. 000 TPHI.RST
84. 624
2371 000
2 042
5 049
0 000
1520 997
0 661
59 881
0 997
0 000
-12 496
0 000
0 692
O. 900
2526. 400
43. 011
4. 026
44. 519
36.390
51.156
464. 006
61. 523
2. 782
48.197
NPHV. RST
NSCR. RST
CP2 V. RST
RCRC.RST
FPDE. RST
SF6P. RST
EXCU. RST
FPGF. RST
XHV. RST
RXFR . RST
SHCU. RST
CIRF. RST
FBAC. RST
SFNA. RST
SFNA. SIG
SFNA. FIL
SIBF. RST
SIBF. SIG
TRAT. RST
CRFI. RST
XTM. RST
BUST. RST
TPHI. SIG
1542. 970
-0. 008
12.100
O. 000
1510.507
144.120
14. 683
1. 001
198. 625
O. 000
33. 365
1. 080
3315. 936
36. 631
O. 689
36. 024
33. 871
O. 973
1.334
227.184
60. 449
O. 000
1.430
** END OF DATA **
* * * * FILE TRAILER * * * *
FILE NA~fE : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/14
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAFiE : EDIT
DATE : 97/10/14
ORIGIN · FLIC
TAPE NAFIE : 97450
CONTINUATION # : 1
PREVIOUS TAPE :
CO~ : BP EXPLORATION, PRUDHOE BAY, Z-03, 50-029-22787-00
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
14-0CT-1997 16:13
PAGE:
11
**** REEL TRAILBR ****
SERVICE NA~E : EDIT
DATE : 97/10/14
ORIGIN : FLIC
REEL NAM~ : 97450
CONTINUATION # ..
PREVIOUS REEL :
CO~NT '. BP EXPLORATION, PRUDHOE BAY, Z-03, 50-029-22787-00
166[ ;~;~ 130
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
**** REEL HEADER ****
SERVICE NAM~ : EDIT
DATE : 97/10/15
ORIGIN : FLIC
REEL NAME : 97440
CONTINUATION #
PREVIOUS REEL :
COM~fEJTT ' B.P. EXPLORATION, Z-03, PRUDHOE BAY, API #50-029-22787-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/10/15
ORIGIN : FLIC
TAPE NAM~ : 97440
CONTINUATION # : 1
PREVIOUS TAPE :
CO~IENT : B.P. EXPLORATION, Z-03, PRUDHOE BAY, API #50-029-22787-00
TAPE HEADER
PRUDHOE BAY
OPEN HOLE WIRELINE LOGS
WELL NAM~ :
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
RUN 1
97440
KIRKBY
COPEN
WELL CASING RECORD
1ST STRING
2ND STRING
Z-03
500292278700
BP EXPLORATION (ALASKA)
SCHLUMBERGER WELL SERVICES
15-0CT~97
RUN 2
97440
KIRKBY
GRABB
RUN 3
19
lin
12E
976
1427
83.75
82.25
29. O0
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 9.625 3104.0
6.000 7.000 9700.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
3RD STRING
PRODUCTION
REM_ARKS:
STRING
This file contains the LDWG Composite OHEDIT for BP
Exploration well Z-03, logged 20-SEP-1997 and
24-SEP-1997. The intermediate portion (RUN 1) ~as
logged in 8-1/2 hole. The TD portion (RUN 2) was run
in 6" hole after intermediate casing was set.
This log (BHCS/GR) is considered the primary depth
control for any future logs. Logged from 6990 - 3000
and 9700 - 10147 ft md. There are no open hole logs
between 6990 - 9700 ft md.
***NOTE*** The AIT rssistivity is NOT CORRECT due to
damage to the AIT while trying to spud through a bridge
at 7000 ft. The log was not rerun at the request of the
BP well site representative and the driller who
recommended that the hole conditions was deteriorating and
that casing should be set immedidately. A second tool was
on location and was ready to run had the hole conditions
been better.
Since then the AIT tool has been sent back to Houston to
be rebuilt.
The 90 inch and the 60 inch investigation measurements
are not present because the values are not correct.
The other investigation depths are presented only for
qualitative information and to aid with bed thickness
determination.
$
PAGE:
**** FILE HEADER ****
FILE NA~E : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE H~ER
FILE NUM~ER: 1
EDITED OPEN HOLEMAIN PASS
Ail tool strings; Depth shifted and clipped curves; all runs merged; no cased hole data.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
PEX 10168.0 9700.0
BCS 10140.0 9700.0
$
BASELINE CURVE FOR SHIFTS: NONE
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
CURVE SHIFT DATA (PiEASUREDDEPTH)
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
BASELINE DEPTH PEX
MERGED DATA SOURCE
LDWG TOOL CODE RUN NO. PASS NO.
PEX 1 1
BCS 1 1
PEX 2 1
BCS 2 1
$
MERGE TOP MERGE BASE
3104.0 6990.0
3104.0 6918.0
9700.0 10168.0
9700.0 10140.0
REMARKS: This file contains the merged and clipped data for the
Array Induction tool (AIT), and Platform Express
Lithodensity (SDN), Compensated Neutron (CNT) and
Borehole Sonic tool (BHC). No depth corrections were
applied as this is the primary depth control.
**NOTE** Post logging problems prevented all the data
from Run 2 from being provided. Only data presented on
the prints is available. The composited/edited data is
that data available in both runs.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 72
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 14
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE APIAPI API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
O0 000 O0 0 1 1 1 4 68 0000000000
DEPT FT 1022691
SP AIT MV 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
GR AIT GAPI 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
TENS AIT LB 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
~ES AIT 0~1022691 O0 000 O0 0 1 1 1 4 68 0000000000
CNTC CNT CPS 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
CFTC CNT CPS 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CNT PU-S 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
DT BCS US/F 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
CALl SDN IN 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
DRHO SDN G/C3 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
PEF SDN BN/E 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
RHOB SDN G/C3 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
AFiO AIT OHMM 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
AF20 AIT OH~M1022691 O0 000 O0 0 1 1 1 4 68 0000000000
AF30 AIT OHT~I 1022691 O0 000 O0 0 1 1 1 4 68 0000000000
AF60 AIT 0H~1022691 O0 000 O0 0 1 1 1 4 68 0000000000
AF90 AIT OH~M1022691 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 10187.000
~fl~ES.AIT 0.037
DT.BCS -999.250
RHOB.SDN -999.250
AF60.AIT -999.250
DEPT. 3104.000
I4~ES.AIT 1.352
DT. BCS 135.938
RHOB.SDN 2.237
AF60.AIT -999.250
SP.AIT -999.250 GR.AIT -999.250 TENS.AIT
CNTC. CNT -999.250 CFTC. CNT -999.250 NPHI.CNT
CAL1.SDN -999.250 DRHO.SDN -999.250 PEF.SDN
AFiO.AIT -999.250 AF20.AIT -999.250 AF30.AIT
AF90.AIT -999.250
SP.AIT 12.813 GR.AIT 71.002 TENS.AIT
CNTC. CNT 2024.896 CFTC. CNT 603.870 NPHI.CNT
CAL1.SDN 3.819 DP~HO.SDN 0.101 PEF. SDN
AFiO.AIT 5.808 AF20.AIT 16.283 AF30.AIT
AF90.AIT -999.250
5449.000
-999.250
-999.250
-999.250
2121.000
48.533
6.492
13.945
** END OF DATA **
**** FILE TRAILER ****
FILE NA~IE : EDIT .001
SERVICE · FLIC
VERSION ' O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NLrM~ER: 2
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUFI~ER : 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH
PEX 3104.0
$
BASELINE CURVE FOR SHIFTS: NONE
CURVE SHIFT DATA (MEASURED DEPTH)
STOP DEPTH
2964.0
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
PEX
.......
This file contains the open hole logs run up into casing
for RUN 1.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 48
4 66 1
5 66
6 73
7 65
8 68 O. 5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
TYPE REPR CODE VALUE
9 65 FT
11 66 21
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
O0 000 O0 0 2 1 1 4 68 0000000000
DEPT FT 1022691
TENS AIT LB 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
TEND AIT LB 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
GRCHAIT GAPI 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
CNTC CNT CPS 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
CFTC CNT CPS 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
FCNT CNT CPS 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
NCNT CNT CPS 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
CRAT CNT 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
NRAT CNT 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNT PU-S 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
CPHI CNT PU-S 1022691 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 3104.000 TENS.AIT 2121.000 TEND.AIT 1047.560 GRCH.AIT
CNTC. CNT 2024.896 CFTC. CNT 603.870 FCNT. CNT 539.786 NCNT. CNT
CRAT. CNT 3.494 NRAT. CNT 3.611 NPHI.CNT 48.533 CPHI.CNT
DEPT. 2964.000 TENS.AIT 2007.000 TEND.AIT 1028.056 GRCH.AIT
CNTC. CNT 1338.990 CFTC. CNT 378.160 FCNT. CNT 385.175 NCNT. CNT
CRAT. CNT 3.801 N~AT. CNT 4.167 NPHI.CNT 54.121 CPHI.CNT
71. 002
1917. 423
40. 408
45.083
1272.632
43.420
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
M_AX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER: 3
EDITED CASED HOLE MAIN PASS
Depth shifted and clipped curves for open hole logs run into casing.
PASS NUM~ER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH
PEX 9700.0
$
BASELINE CURVE FOR SHIFTS: NONE
CURVE SHIFT DATA (M~SUREDDEPTH)
STOP DEPTH
..........
9578.0
BASELINE DEPTH
..............
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
PEX
.......
REMARKS:
This file contains the open hole logs run up into casing
for RUN 2.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 8
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE AUJMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 3 1 1 4
TENS AIT LB 1022691 O0 000 O0 0 3 1 1 4
GRCH AIT GAPI 1022691 O0 000 O0 0 3 1 1 4
CNTC CNT CPS 1022691 O0 000 O0 0 3 1 1 4
CFTC CNT CPS 1022691 O0 000 O0 0 3 1 1 4
NPHI CNT PU-S 1022691 O0 000 O0 0 3 1 1 4
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
68 0000000000
** DATA **
DEPT. 9700.000 TENS.AIT 5290.000 GRCH.AIT
CFTC. CNT 1036.842 NPHI.CNT 23.349
DEPT. 9578.000 TENS.AIT 5245.000 GRCH.AIT
CFTC. CNT 397.280 NPHI.CNT 44.781
49.396 CNTC. CNT
103.589 CNTC. CNT
2210.464
1244.315
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
**** FILE TRAILER ****
FILE NAlViE : EDIT .003
SERVICE . FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAM~E : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUMBER:
TOOL STRING ~ER:
PASS NU~BER:
DEPTH INCREMENT:
FILE SU14MARY
FILE HEADER
FILE NUMBER 4
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
1
1
1
0.5000
VEaVDOR TOOL CODE START DEPTH STOP DEPTH
AIT 6984.0 3104.0
PEX 6984.0 3104.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR) :
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.0
3000.0
6960.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
TOOL NUMBER
...........
DSLC-B 817B
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 10
SDT
PEX
AIT
$
ARRAY SONIC SONDE
PLATFORM EXPRESS
~Y INDUCTION TOOL
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF)
RESISTIVITY (OH~2q) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
SLS-W 1408
HTBCC 794
AIT-H 121
8.500
3104.0
3104.0
WATER BASED MUD
10.50
61.0
9.4
212.0
1. 890 65.0
1. 690 65.0
2. 290 65.0
RE~ARJ~S: ************ RUN 1 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOFF RUN ON THE AITH
BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
lqqIS IS THE RAW (OPEN HOLE) MAIN PASS PEX/AIT
DATA SAMPLED AT 0.5' SAMPLE RATES.
$
LIS FORMAT DATA
TOOL STANDOFF (IN):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SAArD S TONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN): 8.500
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
11
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 136
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 7
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
SP AIT MV 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
GR AIT GAPI 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
TENS AIT LB 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
HTENAIT LB 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
I~RES AIT OHT4M1022691 O0 000 O0 0 4 1 1 4 68 0000000000
MTEMAIT DEGF 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
GDEVAIT DEG 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
CNTC PEX CPS 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
CFTC PEX CPS 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
RCFT PEX CPS 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
RCNT PEX CPS 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
TNRA PEX 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
RTNR PEX 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
TNPH PEX PU 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
NPHI PEX PU 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
NPOR PEX PU 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
DT BHC US/F 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
TT1 BHC US 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
TT2 BHC US 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
TT3 BHC US 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
TT4 BHC US 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
HCAL PEX IN 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
RHOZ PEX G/C3 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
HDRA PEX G/C3 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
PEFZ PEX 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 12
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DPHZ PE~ PU 1022691 O0 000 O0 0 4 1 1 4 68 0000000000
HMIN PEX 0H~1022691 O0 000 O0 0 4 1 1 4 68 0000000000
H~NO PEX 0H~I1022691 O0 000 O0 0 4 1 1 4 68 0000000000
RXOZ PEX 0~1022691 O0 000 O0 0 4 1 1 4 68 0000000000
RX08 PEX 0H~1022691 O0 000 O0 0 4 1 1 4 68 0000000000
AFiO AIT 0H~1022691 O0 000 O0 0 4 1 1 4 68 0000000000
AF20 AIT 0~1022691 O0 000 O0 0 4 1 1 4 68 0000000000
AF30 AIT 0P~4~1022691 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 6984.000 SP.AIT 10.375 GR.AIT 149.126 TENS.AIT 2403.000
HTEN.AIT 622.251 FiRES.AIT 0.853 MTE~.AIT 129.998 GDEV. AIT -999.250
CNTC.PEX 1605.616 CFTC.PEX 734.794 RCFT. PEX 638.266 RCNT. PEX 1508.393
TNRA.PEX 2.233 RTNR.PEX 2.407 TNPH. PEX 22.351 NPHI.PEX 26.809
NPOR.PEX 21.767 DT.BHC 109.609 TT1.BHC 700.234 TT2.BHC 483.906
TT3.BHC 689.922 TT4.BHC 467.813 HCAL.PEX 3.867 RHOZ.PEX -999.250
HDRA.PEX -999.250 PEFZ.PEX -999.250 DPHZ.PEX 60721.211 H~IN. PEX 1.863
PL~INO.PEX 1.629 RXOZ.PEX 1.994 RXO8.PEX 1.956 AFiO.AIT 4.037
AF20.AIT 7.794 AF30.AIT 8.642
DEPT. 3104. 000 SP. AIT
HTEN.AIT 1047. 560 f~RES.AIT
CNTC. PEX 2024. 896 CFTC.PEX
TNRA . PEX 3. 494 R TNR . PEX
NPOR. PEX 39.190 DT. BHC
TT3 . BHC 832. 969 TT4. BHC
PiDRA . PEX O . 1 O1 PEFZ . PEX
H~VO . PEX O . 354 RXOZ . PEX
AF20.AIT 16.283 AF30.AIT
12.813 GR.AIT
1.352 MTEM.AIT
603.870 RCFT.PEX
3.611 TNPH. PEX
135.938 TT1.BHC
554.531 HCAL.PEX
6.492 DPHZ.PEX
0.495 RXO8.PEX
13.945
71.002 TENS.AIT 2121.000
93.908 GDEV. AIT 22.304
539.786 RCNT. PEX 1917.423
40.408 NPHI.PEX 48.533
833.750 TT2.BHC 551.953
3.819 RHOZ.PEX 2.237
25.013 H~IN. PEX 0.720
0.342 AFiO.AIT 5.808
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
13
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUFIBER:
DEPTH INCREM~aYT :
FILE SUM~JL~Y
FILE HEADER
FILE NUM~ER 5
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
2
2
1
0.5000
VEaVDOR TOOL CODE START DEPTH STOP DEPTH
PEX 10187.0 9700.0
BCS 10187.0 9700.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIf4~ CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR AUX. MEAS~S
SDT SONIC CARTRIDGE
PEX PLATFORM EXPRESS
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
24-SEP-97
8C0-609
800 24-SEP-97
730 24-SEP-97
10187.0
10187.0
9700.0
10140.0
TOOL NUM~ER
AAMS-A 850
SDC-CB 17
HILTB-DTB
HTBCC 794
AIT-H 121
6.000
9700.0
9700.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
14
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF)
RESISTIVITY (OH~f) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT) ..
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
QUICK DRILN FLUID
8.80
54.0
9.1
225.0
O. 102 65.0
0.106 65.0
0.107 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN): 1.0
RE~3AR3fS: ************ RUN 2 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
THIS IS THE TD LOGGING RUN FOR THIS WELL.
FOUR STANDOFFS RUN ON THE SONIC
HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROOS TO 5 DEG
DATA SAMPLED AT 0.5' SAMPLE RATES.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 88
4 66 1
5 66
6 73
7 65
8 68 O. 5
9 65 FT
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 15
TYPE REPR CODE VALUE
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE ~ CHAN **
NAME SERVUNIT SERVICE API API API API FILE ~JRiB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
SP AIT MV 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
GR AIT GAPI 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
TENS AIT LB 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
24~ES AIT 0H~4102269i O0 000 O0 0 5 1 1 4 68 0000000000
CNTC PEX CPS 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
CFTC PEX CPS 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
NPHI PEX PU 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
DT BHC US/F 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
TT1 BHC US 1022691 O0 000 O0 0 5 I 1 4 68 0000000000
TT2 BHC US 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
TT3 BHC US 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
TT4 BHC US 1022691 O0 000 O0 0 5 i 1 4 68 0000000000
HCAL PEX IN 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
RHOZ PEX G/C3 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
I~DRA PEX G/C3 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
PEFZ PEX 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
AFiO AIT 0HI~41022691 O0 000 O0 0 5 1 1 4 68 0000000000
AF20 AIT 0H~4102269i O0 000 O0 0 5 1 1 4 68 0000000000
AF30 AIT 0t~4 1022691 O0 000 O0 0 5 1 1 4 68 0000000000
AF60 AIT 0H~41022691 O0 000 O0 0 5 1 1 4 68 0000000000
AFgO AIT 0H5~4102269i O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 10210.000 SP.AIT 58.625 GR.AIT 46.957 TENS.AIT
24~ES.AIT 0.037 CNTC. PEX 2703.715 CFTC. PEX 1217.734 NPHI. PEX
DT. BHC 83.700 TT1.BHC 530.000 TT2.BHC 360.800 TT3.BHC
TT4.BHC 378.400 HCAL.PEX 4.075 RHOZ.PEX -999.250 HDRA.PEX
PEFZ. PEX -999.250 AFiO.AIT 3.840 AF20.AIT 4.188 AF30.AIT
AF60.AIT 5.308 AF90.AIT 4.178
DEPT. 9700.000 SP.AIT -3.813 GR.AIT 49.396 TENS.AIT
lziRES.AIT 0.037 CNTC. PEX 2210.464 CFTC. PEX 1036.842 NPHI.PEX
DT. BHC 70.800 TT1.BHC 464.800 TT2.BHC 298.800 TT3.BHC
TT4.BHC 275.200 HCAL.PEX 6.512 RHOZ.PEX 3.058 HDRA.PEX
2400.000
25.169
544.000
-999.250
5.071
5290.000
23.349
465.200
0.260
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 16
PEFZ.PEX 10.000 AFiO.AIT
AF60.AIT 15.121 A~90.AIT
1950.000 AF20.AIT
21.321
1950.000 AF30.AIT
1950.000
** END OF DATA **
**** FILE TRAILER ****
FILE NAI~E : EDIT .005
SERVICE · FLIC
VERSION - O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE 'FLIC
VERSION ·OOiCO1
DATE · 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN~ER:
TOOL STRING NO?4BER:
PASS--ER:
DEPTH INCREMENT:
FILE SU~ff4ARY
FILE HEADER
FILE~ER 6
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
1
1
1
0.25000
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 6984.0 3104.0
PEX 6984.0 3104.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TDLOGGER (FT):
20-SBP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
17
TOP LOG INTERVAL {FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
SDT ARRAY SONIC SONDE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) '.
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
3000.0
6960.0
TOOL NUMBER
DSLC-B 817B
SLS-W 1408
HTBCC 794
AIT-H 121
8.500
3104.0
3104.0
WATER BASED MUD
10.50
61.0
9.4
212.0
1.890 65.0
1.690 65.0
2. 290 65.0
REMARKS: ************ RUN 1 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THE RAW (OPEN HOLE) MAIN PASS AIT DATA
SAMPLED AT 0.25' SAMPLE RATE.
$
LIS FORMAT DATA
TOOL STANDOFF (IN):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN): 8.500
f~6'fr
~9 '8
£IV'O£8V ~8~'9~ £IV'OW~rV 808 '~ .r. IV'OIS¥ 000 '~Orf
£IV'OEWV ~6£'£ £IV'OUS¥ £EO'~ ~IV'Or~ 000'~869 '£d~C
I 99 0
r 99 9r
89 99
0 99
~9 99
~W g9 6
~'0 89 8
~9
££ 9
99
r 99
9r EL
0 99
0 99
~ CHOD~ NOI£VDIWID~dS .r. VI4HOW V£V~I ~
f£:rr £66r-£DO-gr
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 19
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE . FLIC
VERSION - O01CO1
DATE . 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAM~E : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE . 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NI]M~ER:
TOOL STRING NUM~ER:
PASS NUM~ER:
DEPTH INCREMENT:
FILE SUF~WzARY
FILE HEADER
FILE~ER 7
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
2
2
1
0.25000
VENDOR TOOL CODE START DEPTH STOP DEPTH
PEX 10187.0 9700.0
BCS 10187.0 9700.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TI~iE CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR AUX. MEAS~S
24-SEP-97
8C0- 609
800 24-SEP-97
730 24-SEP-97
10187.0
10187.0
9700.0
10140.0
TOOL NUMBER
...........
AAMS-A 850
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 20
SDT
PEX
P~
AIT
$
SONIC CARTRIDGE
PLATFORM EXPRESS
PLATFORM EXPRESS
ARRAY INDUCTION TOOL
SDC-CB 17
HILTB-DTH
HTBCC 794
AIT-H 121
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) '.
6.000
9700.0
9700.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G) '.
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3) '.
MAXIMUM RECORDED TEMPERATURE (DEGF)
RESISTIVITY (OH~) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT) '.
MUD CAKE AT (BHT):
QUICK DRILN FLUID
8.80
54.0
9.1
225.0
O. 102 65.0
0.106 65.0
0.107 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN) '.
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN): 1.0
RENIARKS: ************ RUN 2 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
THIS IS THE TD LOGGING RUN FOR THIS WELL.
FOUR STANDOFFS RUN ON THE SONIC
HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG
DATA SAMPLED AT 0.25' SAMPLE RATES.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 21
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
7 65
8 68 0.25
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN**
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 7 1 1 4 68 0000000000
AFiO AIT OP~4~ 1022691 O0 000 O0 0 7 1 1 4 68 0000000000
AF20 AIT OHMM 1022691 O0 000 O0 0 7 1 1 4 68 0000000000
AF30 AIT 0P~4~1022691 O0 000 O0 0 7 1 1 4 68 0000000000
AF60 AIT OHMM1022691 O0 000 O0 0 7 1 1 4 68 0000000000
AF90 AIT 0Ek4~1022691 O0 000 O0 0 7 1 1 4 68 0000000000
** DATA **
DEPT. 10210.000 AFiO.AIT 3.840
AF60.AIT 5.308 AF90.AIT 4.178
DEPT. 9700.000 AFIO.AIT 1950.000
AF60.AIT 15.121 AFgO.AIT 21.321
AF20.AIT 4.188 AF30.AIT
AF20.AIT 1950.000 AF30.AIT
5. 071
1950.000
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 22
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE · FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .008
SERVICE .FLIC
VERSION .O01CO1
DATE · 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUMBER:
TOOL STRING NUMBER:
PASS NtC~ER :
DEPTH INCREMENT:
FILE SOW~NLgY
FILE H~ER
FILE NUMBER 8
P~AW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) follo~/ed by files for other main pass tool strings per run.
1
1
1
0.1667
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 6984.0 3104.0
PEX 6984.0 3104.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TII4~ CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) '.
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.0
3000.0
6960.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
TOOL NUMBER
...........
DSLC-B 817B
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 23
SDT
PEX
AIT
$
ARRAY SONIC SONDE
PLATFORM EXPRESS
ARRAY INDUCTION TOOL
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~ff~) AT TEMPERATURE (DEGF) :
MUD AT ~4EASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
SLS-W 1408
HTBCC 794
AIT-H 121
8.500
3104.0
3104.0
WATER BASED MUD
10.50
61.0
9.4
212.0
1. 890 65.0
1. 690 65.0
2. 290 65.0
REMARKS: ************ RUN 1 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOFF RUN ON THE AITH
BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THE RAW (OPEN HOLE) MAIN PASS AIT DATA
SAMPLED AT 0.25' SAMPLE RATE.
THIS IS THE RAW (OPEN HOLE) MAIN PASS PEX DATA
SAMPLED AT 0.1667' SAMPLE RATE.
$
LIS FORMAT DATA
TOOL STANDOFF (IN):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN): 8. 500
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 24
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
i 66 0
2 66 0
3 73 80
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 12
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUNiB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
RHOZ PEX G/C3 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
HDRA PEX G/C3 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
PEFZ PEX 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
DPHZ PEX PU 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
H~IN PEX 0H~$1022691 O0 000 O0 0 8 1 1 4 68 0000000000
H~NO PEX 0H~1022691 O0 000 O0 0 8 1 1 4 68 0000000000
RXOZ PEX OH~M1022691 O0 000 O0 0 8 1 1 4 68 0000000000
RX08 PEX 0H~I~I1022691 O0 000 O0 0 8 1 1 4 68 0000000000
HCNT PEX CPS 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
HCFT PEX CPS 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
HGR PEX GAPI 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
RHFT PEX CPS 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
RI~FfPEX CPS 1022691 O0 000 O0 0 8 i 1 4 68 0000000000
HTNP PEX PU 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
HNPO PEX PU 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
TT1 BHC US 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
TT2 BHC US 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
TT3 BHC US 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
TT4 BHC US 1022691 O0 000 O0 0 8 1 1 4 68 0000000000
** DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 25
DEPT. 6984. 000 RHOZ. PEX
DPHZ.PEX 60721.211 HMIN. PEX
RXO8 . PEX 1.956 HCNT. PEX
RHFT. PEX 638.2 66 RHNT. PEX
TT1 .BHC 700.234 TT2.BHC
DEPT. 3104.000 RHOZ.PEX
DPHZ.PEX 25.013 HMIN. PEX
RJfO8 . PEX 0.342 HCNT. PEX
RHFT. PEX 516. 021 RHNT. PEX
TT1 . BHC 833. 750 TT2. BHC
-999. 250 HDRA. PEX
1.863 HMNO . PEX
1605. 615 HCFT. PEX
1508. 393 HTNP. PEX
483. 906 TT3. BHC
2.237 I{DRA.PEX
0.720 PmlNO. PEX
2018.829 HCFT. PEX
1904.683 HTNP. PEX
551.953 TT3.BHC
-999.250 PEFZ.PEX
1.629 RXOZ.PEX
734.794 HGR.PEX
22.351 HNPO.PEX
689.922 TT4.BHC
0.101 PEFZ.PEX
0.354 RXOZ.PEX
600.059 HGR.PEX
40.587 HNPO.PEX
832.969 TT4.BHC
-999
l
149
21
467
6
0
70
39
554
.250
.994
.126
.767
.813
.492
.495
.346
.531
.531
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .008
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .009
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 9
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String ~1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUFi~ER: 2
TOOL STRING NU~BER: 2
PASS ArUMBER: 1
DEPTH INCREMENT: 0.1667
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
PEX 10187.0 9700.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 26
BCS
$
LOG HEADER DATA
10187.0
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT)
LOGGING SPEED (FPHR) :
9700.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR AUX. MEASUREMENTS
SDT SONIC CARTRIDGE
PEX PLATFORM EXPRESS
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF)
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATUR~ (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
************ RUN2 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
24-SEP-97
8C0-609
800 24-SEP-97
730 24-SEP-97
10187.0
10187.0
9700.0
10140.0
TOOL NUMBER
AAMS-A 850
SDC-CB 17
HILTB-DTB
HTBCC 794
AIT-H 121
6.000
9700.0
9700.0
QUICK DRILN FLUID
8.80
54.0
9.1
225.0
O. 102 65.0
O. 106 65.0
O. 107 65.0
THERMAL
SANDSTONE
2.65
1.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 27
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
THIS IS THE TD LOGGING RUN FOR THIS WELL.
FOUR STANDOFFS RUN ON THE SONIC
HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG
DATA SAMPLED AT 0.1667' SAMPLE RATES.
$
LIS FORMAT DATA
DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 32
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 32
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 9 1 1 4 68 0000000000
RHOZ PEX G/C3 1022691 O0 000 O0 0 9 1 1 4 68 0000000000
HDRA PEX G/C3 1022691 O0 000 O0 0 9 1 1 4 68 0000000000
PEFZ PEX 1022691 O0 000 O0 0 9 1 1 4 68 0000000000
TT1 BHC US 1022691 O0 000 O0 0 9 1 1 4 68 0000000000
TT2 BHC US 1022691 O0 000 O0 0 9 1 1 4 68 0000000000
TT3 BHC US 1022691 O0 000 O0 0 9 1 1 4 68 0000000000
TT4 BHC US 1022691 O0 000 O0 0 9 1 1 4 68 0000000000
** DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 28
DEPT. 10210.000 RHOZ. PEX
TT1.BHC 530.000 TT2.BHC
DEPT. 9700.000 RHOZ.PEX
TT1.BHC 464.800 TT2.BHC
-999.250 t{DRA.PEX
360.800 TT3.BHC
3.058 HDRA.PEX
298.800 TT3.BHC
-999.250
544.000
O. 260
465. 200
PEFZ. PEX
TT4. BHC
PEFZ. PEX
TT4. BHC
-999.250
378.400
10.000
275.200
** END OF DATA **
* * * * FILE TRAILER * * * *
FILE NAME : EDIT .009
SERVICE · FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .010
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 10
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
TOOL STRING NUMiBER: 1
PASS NUMBER: 1
DEPTH INCREMENT: 0. 0833
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
AIT 6984.0
PEX 6984.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
STOP DEPTH
3104.0
3104.0
20-SEP-97
8C0-609
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 29
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.0
3000.0
6960.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
SDT ARRAY SONIC SONDE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
TOOL NUMBER
...........
DSLC-B 817B
SLS-W 1408
HTBCC 794
AIT-H 121
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
8.500
3104.0
3104.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TE~IPERATURE (DEGF)
RESISTIVITY (O~R4~) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
WATER BASED MUD
10.50
61.0
9.4
212.0
1. 890 65.0
1. 690 65.0
2. 290 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
8.500
TOOL STANDOFF (IN):
************ RUN1 *************
NABORS 1SE
THIS IS A PRIMARY DEPT~LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOFF RUN ON THE AITH
BOWSPRING RUN ONNEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THERAW (OPEN HOLE) MAIN PASS AIT DATA
SAMPLED AT 0.25' SAMPLERATE.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 30
THIS IS THE RAW (OPEN HOLE) MAIN PASS PEX DATA
SAMPLED AT 0.0833' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
5 66
6 73
7 65
8 68 0.083
9 65 FT
11 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN**
NAME SERV UNIT SERVICE API API API API FILE AKIf4B NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUFiB SAMP ELE~ CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 10 1 1 4 68 0000000000
HCAL PEX IN 1022691 O0 000 O0 0 10 1 1 4 68 0000000000
** DATA **
DEPT. 6984.000 HCAL.PEX 3.867
DEPT. 3104.000 HCAL.PEX 3.819
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
31
** * * FILE TRAILER * * * *
FILE NA~E : EDIT .010
SERVICE · FLIC
VERSION : O01CO1
DATE ' 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NA~E : EDIT .011
SERVICE · FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUMBER:
TOOL STRING ~ER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SU~VARY
FILE HEADER
FILE NUMBER 11
RAW OPEN HOLEMAIN PASS
Curves and log header data for each run and tool string in separate files; Tool String #1 fo
Sadlerochit run presented first (primary depth control string used to depth shift the Sadler
interval) followed by files for other main pass tool strings per run.
2
2
1
0.0883
VENDOR TOOL CODE START DEPTH STOP DEPTH
PEX 10187.0 9700.0
BCS 10187.0 9700.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIf4E CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPH~) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR AUX. MEASUREMENTS
24-SEP-97
8C0-609
800 24-SEP-97
730 24-SEP-97
10187.0
10187.0
9700.0
10140.0
TOOL NUMBER
AAMS-A 850
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
32
SDT
PEX
PEX
AIT
$
SONIC CARTRIDGE
PLATFORM EXPRESS
PLATFORM EXPRESS
ARRAY INDUCTION TOOL
SDC-CB 17
HILTB-DTB
HTBCC 794
AIT-H 121
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
6.000
9700.0
9700.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OH~) AT TEMPERATURE (DEGF) :
MUD AT ~iEASUkED T~4PERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT):
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
QUICK DRILN FLUID
8.80
54.0
9.1
225.0
O. 102 65.0
O. 106 65.0
0.107 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN): 1.0
RE~'/ARKS: ************ RUN 2 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
THIS IS THE TD LOGGING RUN FOR THIS WELL.
FOUR STANDOFFS RUN ON THE SONIC
HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO $ DEG
DATA SAMPLED AT 0.0883' SAMPLE RATES.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
t5-0CT-1997 11:33
PAGE:
33
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 I
5 66
6 73
7 65
8 68 0.083
9 65 FT
11 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD AUJM~ SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 11 1 1 4 68 0000000000
HCAL PEX IN 1022691 O0 000 O0 0 11 1 1 4 68 0000000000
** DATA **
DEPT. 10210.000 HCAL.PEX 4.075
DEPT. 9700.000 HCAL.PEX 6.512
** END OF DATA **
**** FILE TRAILER ****
FILE NAM~ : EDIT .011
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
34
**** FILE HEADER ****
FILE NAME : EDIT .012
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUMBER:
TOOL STRING N[rM~ER
PASS NI]M~ER :
DEPTH INCREMENT
FILE SUM~zARY
FILE HEADER
FILE~ER 12
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
1
1
2
0.5000
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 3420.0 3104.0
PEX 3420.0 3104.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VEArDOR TOOL CODE TOOL TYPE
BHC
SDT
PEX
AIT
$
BOREHOLE SONIC CARTR.
ARRAY SONIC SONDE
PLATFORM EXPRESS
ARRAY INDUCTION TOOL
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.0
3000.0
6960.0
1800.0
BOREHOLE CONDITIONS
MUD TYPE:
TOOL NUMBER
...........
DSLC-B 817B
SLS-W 1408
HTBCC 794
AIT-H 121
8.500
3104.0
3104.0
WATER BASED MUD
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
35
MUD DENSITY (LB/G): 10.50
MUD VISCOSITY (S) : 61.0
MUD PH: 9.4
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF): 212.0
RESISTIVITY (Ot~4~l) AT TEMPERATURE (DEGF) :
MUD AT ~4F~a~g~ TEMPERATURE (MT): 1.890
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT): 1. 690
MUD FILTRATE AT (BHT):
MUD CAKE AT (MT): 2. 290
MUD CAKE AT (BHT) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERM3LL
SANDSTONE
2.65
TOOL STANDOFF (IN): 1.0
REMARKS: ************ RUN 1 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THE RAW (OPEN HOLE) REPEAT PASS DATA
ACQUITED AT 0.5' SAMPLE RATE.
$
LIS FORMAT DATA
65.0
65.0
65.0
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 72
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 14
12 68
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 3 6
TYPE REPR CODE VALUE
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
SP AIT MV 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
GR AIT GAPI 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
TENS AIT LB 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
HTENAIT LB 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
MRES AIT OPff4M1022691 O0 000 O0 0 12 1 1 4 68 0000000000
MTEMAIT DEGF 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
GDEVAIT DEG 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
CNTC PEX CPS 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
CFTC PEX CPS 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
RCFT PEX CPS 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
RCNT PEX CPS 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
TNRA PEX 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
RTNR PEX 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
TNPH PEX PU 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
NPHI PEX PU 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
NPOR PEX PU 1022691 O0 000 O0 0 12 1 1 4 68 0000000000
DT BHC US/F102269i O0 000 O0 0 12 1 1 4 68 0000000000
** DATA **
DEPT. 6984. 000 SP.AIT
HTEN. AIT 622. 251 F~tES. AIT
CNTC. PEX 1605. 616 CFTC . PEX
TNRA . PEX 2. 233 RTNR . PEX
NPOR. PEX 21.767 DT. BHC
10.375 GR.AIT
0.853 MTEM. AIT
734.794 RCFT. PEX
2.407 TNPH. PEX
109.609
DEPT. 3104.000 SP. AIT 12. 813 GR. AIT
HTEN. AIT 1047. 560 MRES.AIT 1. 352 MTEM.AIT
CNTC. PEX 2024. 896 CFTC. PEX 603 . 870 RCFT. PEX
TNRA.PEX 3. 494 RTNR.PEX 3. 611 TNPH. PEX
NPOR . PEX 39.190 DT. BHC 135.938
149.126 TENS.AIT 2403.000
129.998 GDEV. AIT -999.250
638.266 RCNT. PEX 1508.393
22.351 NPHI.PEX 26.809
71.002 TENS.AIT 2121.000
93.908 GDEV. AIT 22.304
539.786 RCNT. PEX 1917.423
40.408 NPHI.PEX 48.533
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
37
**** FILE TRAILER ****
FILE NAME : EDIT .012
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .013
SERVICE · FLIC
VERSION ' O01CO1
DATE . 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NIIMBER 13
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUMBER: 2
TOOL STRING NUMBER: 2
PASS NUMBER: 2
DEPTH INC~: 0.5000
FILE SUMi~ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
10086.0 9700.0
PEX
LOG HEADER DATA
DATE LOGGED: 24-SEP-97
SOFTWARE VERSION: 8C0- 609
TI~E CIRCULATION ENDED: 800 24-SEP-97
TIME LOGGER ON BOTTOM: 730 24-SEP-97
TD DRILLER (FT) :
TD LOGGER (FT) : 10187.0
TOP LOG INTERVAL (FT) : 9700.0
BOTTOM LOG INTERVAL (FT) : 10140.0
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX AUX. M~ASUREMENT
SDT SONIC CARTRIDGE
PEX PLATFORM EXPRESS
PEX PLATFORM EXPRESS
TOOL NUMBER
AAMS-A 850
SDC-CB 17
HILTB -DTB
HTBCC 794
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
38
AIT
$
ARRAY INDUCTION TOOL
AIT-H 121
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
6.000
9700.0
9700.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
QUICK DRILN FLUID
8.80
54.0
9.1
225.0
O. 102 65.0
0.106 65.0
0.107 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) : THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): 1.0
REMARKS.' ************ RUN 2 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
THIS IS THE TD LOGGING RUN FOR THIS WELL.
FOUR STANDOFFS RUN ON THE SONIC
HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG
ACQUIRED AT A O. 5 ' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 39
TYPE REPR CODE VALUE
3 73 36
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 28
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 13 1 1 4 68 0000000000
SP AIT MV 1022691 O0 000 O0 0 13 1 1 4 68 0000000000
GR AIT GAPI 1022691 O0 000 O0 0 13 1 1 4 68 0000000000
TENS AIT LB 1022691 O0 000 O0 0 13 1 1 4 68 0000000000
~RES AIT 0H~41022691 O0 000 O0 0 13 1 1 4 68 0000000000
CNTC PEX CPS 1022691 O0 000 O0 0 13 1 1 4 68 0000000000
CFTC PEX CPS 1022691 O0 000 O0 0 13 1 1 4 68 0000000000
NPHI PEX PU 1022691 O0 000 O0 0 13 1 1 4 68 0000000000
DT BHC US/F 1022691 O0 000 O0 0 13 1 1 4 68 0000000000
** DATA **
DEPT.
MRES.AIT
DT. BHC
10086.000 SP.AIT 39.688 GR.AIT 84.088 TENS.AIT 4183.000
0.021 CNTC.PEX 4382.022 CFTC. PEX 2816.111 NPHI.PEX 14.972
80.500
DEPT.
FLgES.AIT
DT. BHC
9734.500 SP.AIT -18.063 GR.AIT 136.979 TENS.AIT 5444.000
0.020 CNTC. PEX 2682.968 CFTC. PEX 1229.622 NPHI.PEX 24.430
88.600
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
4O
**** FILE TRAILER ****
FILE NA~E : EDIT .013
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .014
SERVICE : FLIC
VERSION · O01CO1
DATE . 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 14
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUM~ER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE S~Y
VENDOR TOOL CODE START DEPTH
AIT 3420.0
PEX 3420.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
3104.0
3104.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
SDT ARRAY SONIC SONDE
PEX PLATFORM EXPRESS
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.0
3000.0
6960.0
1800.0
TOOL NUMBER
DSLC-B 817B
SLS-W 1408
HTBCC 794
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 41
AIT
ARRAY INDUCTION TOOL
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERA7%IRE (DEGF) :
RESISTIVITY (OHNk4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
AIT-H 121
8.500
3104.0
3104.0
WATER BASED MUD
10.50
61.0
9.4
212.0
1. 890 65.0
1.690 65.0
2. 290 65.0
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
BOWSPRING RUN ON NEUTRON FOR ECCE1TTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - L~ED OUT FROM BRIDGE.
THIS IS THE RAW (OPEN HOLE) REPEAT PASS DATA
ACQUITED AT 0.25' SAMPLE RATE.
¢
LIS FORMAT DATA
TOOL STANDOFF (IN): 1.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 42
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 16
4 66 1
5 66
6 73
7 65
8 68 0.25
9 65 FT
11 66 64
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN * *
NA~E SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP EL~4 CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 14 1 1 4 68 0000000000
AFiO AIT 0HI~1022691 O0 000 O0 0 14 1 1 4 68 0000000000
AF20 AIT 0H~1022691 O0 000 O0 0 14 1 1 4 68 0000000000
AF30 AIT 0P~1022691 O0 000 O0 0 14 1 1 4 68 0000000000
** DATA **
DEPT. 6984.000 AFIO.AIT 4.037 AF20.AIT 7.794 AF30.AIT
DEPT. 3104.000 AFiO.AIT 5.808 AF20.AIT 16.283 AF30.AIT
8. 642
13.945
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 43
**** FILE TRAILER ****
FILE NAFiE : EDIT .014
SERVICE : FLIC
VERSION : O01CO1
DATE . 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NA~E : EDIT .015
SERVICE · FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE H~ER
FILE~ER 15
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUMBER: 2
TOOL STRING NUMBER: 2
PASS NUMBER: 2
DEPTH INCREMENT: 0.25000
FILE SUFmblRY
VENDOR TOOL CODE START DEPTH STOP DEPTH
10086.0 9700.0
PEX
LOG HEADER DATA
DATE LOGGED: 24-SEP-97
SOFTWARE VERSION: 8C0 - 609
TIME CIRCULATION ENDED: 800 24-SEP-97
TIME LOGGER ON BOTTOM: 730 24-SEP-97
TD DRILLER (FT) :
TD LOGGER (FT) : 10187.0
TOP LOG INTERVAL (FT) : 9700.0
BOTTOM LOG INTERVAL (FT) : 10140.0
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
PEX AUX. ~EASUREFfl~NT AAMS-A 850
SDT SONIC CARTRIDGE SDC-CB 17
PEX PLATFORM EXPRESS HILTB-DTB
PEX PLATFORM EXPRESS HTBCC 794
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 44
AIT
$
~Y INDUCTION TOOL
AIT-H 121
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
6.000
9700.0
9700.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OIL~4) AT TEMPERATURE (DEGF) :
MUD AT RiEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
QUICK DRILN FLUID
8.80
54.0
9.1
225.0
O. 102 65.0
O. 106 65.0
0.107 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) : THERMAL
MATRIX '. SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): 1.0
REMARKS: ************ RUN 2 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
THIS IS THE TD LOGGING RUN FOR THIS WELL.
FOUR STANDOFFS RUN ON THE SONIC
HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG
ACQUIRED AT A 0.25' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
908 '6
· r. IV'Of~V£8r'~
6£0 '6 £IV'06~ 090 'Or J~IV'O9~qf
£IV'OU~rV ££~ '6 £IV'Or~V 0S£ '~£L6
80S' 5 J. IV' 06~-V SUg' £ £IV' 09SV
£90 '~ £IV'OrSV 000 '9800r
0000000000 89 ~ r r g~ 0 O0 000 O0 r69UEOrf4~FIO £IV 06=~V
0000000000 89 ~ r r £r 0 O0 000 O0 r69&~OrA~O ~IV 09~¥
0000000000 89 ~ r r g~ 0 oo 000 oo r69~OrAU4HO ~IV Of~qf
0000000000 89 ~ r r gr 0 oo 000 oo r69u~or ~0 £IV o~Hv
0000000000 89 ~ r r g~ 0 oo 000 oo r69u~orf4[4Ho £IV or~qf
0000000000 89 ~ r r Sr 0 O0 000 O0 r69~0~ ~ ~0
(X~H) HGOD ~q~ dI4VS ~ COW SSWID ~dZ.~ OO~ # HH~HO ~I
SSHDOHd Hd~H ~ZIS HI4DN HWi1N ~I~ IdV IHV IdV IdV HDIA~F~S £IN_Q AHHS HASfN
~ NVHD - ~JI~L £HE ~
r 99 0
r 99 9~
89 99
0 99
89
~ 99
~ 59 6
5U'O 89 8
59
gL 9
99
r 99
fl: Ir £66r-.r. DO-gr
~ur.$sr.~I uo.r3~mr, gr.J~A ~de£ SI~
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 46
**** FILE HEADER ****
FILE NAi~E : EDIT . O16
SERVICE - FLIC
VERSION - O01CO1
DATE · 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUBIBER :
DEPTH INCREMENT:
FILE SUI~4ARY
FILE HEADER
FILE NUM~ER 16
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
1
1
2
0.1667
VENDOR TOOL CODE START DEPTH STOP DEPTH
AIT 3420.0 3104.0
PEX 3420.0 3104.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TII4E CIRCULATION ENDED:
TII4E LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC
SDT
PEX
AIT
$
BOREHOLE SONIC CARTR.
ARRAY SONIC SONDE
PLATFORM EXPRESS
ARRAY INDUCTION TOOL
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.0
3000.0
6960.0
1800.0
TOOL NUMBER
...........
DSLC-B 817B
SLS-W 1408
HTBCC 794
AIT-H 121
8.500
3104.0
3104.0
WATER BASED MUD
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
47
MUD DENSITY (LB/G): 10.50
MUD VISCOSITY (S) : 61.0
MUD PH: 9.4
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) : 212.0
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT): 1. 890
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT): 1. 690
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT): 2. 290
14UD CAKE AT (BHT) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN): 1.0
REMARKS: ************ RUN 1 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THE RAW (OPEN HOLE) REPEAT PASS DATA
ACQUITED AT 0 . 1667 ' SAMPLE RATE.
$
LIS FORMAT DATA
65.0
65.0
65.0
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 80
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 12
12 68
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 48
TYPE REPR CODE VALUE
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NANiE SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
RHOZ PEX G/C3 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
FiDRA PEX G/C3 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
PEFZ PEX 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
DPHZ PEX PU 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
HMIN PEX OFiff~41022691 O0 000 O0 0 16 1 1 4 68 0000000000
HMNO PEX OH~ff41022691 O0 000 O0 0 16 1 1 4 68 0000000000
RXOZ PEX 0tfl~41022691 O0 000 O0 0 16 1 1 4 68 0000000000
RX08 PEX OH~4M1022691 O0 000 O0 0 16 1 1 4 68 0000000000
HCNT PEX CPS 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
HCFT PEX CPS 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
HGR PEX GAPI 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
RHFT PEX CPS 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
RHNTPEX CPS 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
HTNP PEX PU 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
PiNPOPEX PU 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
TT1 BHC US 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
TT2 BHC US 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
TT3 BHC US 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
TT4 BHC US 1022691 O0 000 O0 0 16 1 1 4 68 0000000000
** DATA **
DEPT. 6984.000 RHOZ.PEX -999.250 PiDRA.PEX -999.250 PEFZ.PEX
DPHZ.PEX 60721.211 H~IN. PEX 1.863 HMNO.PEX 1.629 RXOZ.PEX
RXO8.PEX 1.956 HCNT.PEX 1605.615 HCFT. PEX 734.794 HGR.PEX
RHFT. PEX 638.266 RtINT.PEX 1508.393 HTNP.PEX 22.351 HNPO. PEX
TT1.BHC 700.234 TT2.BHC 483.906 TT3.BHC 689.922 TT4.BHC
DEPT. 3104.000 RHOZ.PEX 2.237 IIDRA.PEX 0.101 PEFZ. PEX
DPHZ.PEX 25.013 H~IIN. PEX 0.720 tflvlNO.PEX 0.354 RXOZ.PEX
RXO8.PEX 0.342 HCNT. PEX 2018.829 HCFT. PEX 600.059 HGR.PEX
RHFT. PEX 516.021 RHNT. PEX 1904.683 HTNP.PEX 40.587 HNPO. PEX
TT1.BHC 833.750 TT2.BHC 551.953 TT3.BHC 832.969 TT4.BHC
-999.250
1.994
149.126
21.767
467.813
6.492
0.495
70.346
39.531
554.531
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
49
**** FILE TRAILER ****
FILE NA~E : EDIT .016
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .017
SERVICE : FLIC
VERSION - O01CO1
DATE · 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUM~ER 17
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NUMBER: 2
TOOL STRING NUMBER: 2
PASS NUMBER: 2
DEPTH INC~: 0.1667
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
10086.0 9700.0
PEX
LOG HEADER DATA
DATE LOGGED: 24 -SEP-97
SOFTWARE VERSION: 8C0- 609
TIME CIRCULATION ENDED: 800 24-SEP-97
TIME LOGGER ON BOTTOM: 730 24-SEP-97
TD DRILLER (FT) :
TD LOGGER (FT) : 10187.0
TOP LOG INTERVAL (FT): 9700.0
BOTTOM LOG INTERVAL (FT) : 10140.0
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
PEX AUX. FiEAS~ AAMS-A 850
SDT SONIC CARTRIDGE SDC-CB 17
PEX PLATFORM EXPRESS HILTB-DTB
PEX PLATFORM EXPRESS HTBCC 794
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
5O
AIT
$
ARRAY INDUCTION TOOL
AIT-H 121
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
LOGGERS CASING DEPTH (FT) :
6.000
9700.0
9700.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHN~I) AT TEMPERATURE (DEGF) :
MUD AT M~ASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
QUICK DRILN FLUID
8.80
54.0
9.1
225.0
O. 102 65.0
O. 106 65.0
O. 107 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN): 1.0
~S: ************ RUN 2
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
THIS IS THE TD LOGGING RUN FOR THIS WELL.
FOUR STANDOFFS RUN ON THE SONIC
HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG
ACQUIRED AT A O. 1667 ' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 51
TYPE REPR CODE VALUE
3 73
4 66
5 66
6 73
7 65
8 68
9 65
11 66
12 68
13 66
14 65
15 66
16 66
0 66
32
1
0.166
FT
32
0
FT
68
1
1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 17 1 1 4 68 0000000000
RHOZ PEX G/C3 1022691 O0 000 O0 0 17 1 1 4 68 0000000000
HDRA PEX G/C3 1022691 O0 000 O0 0 17 1 1 4 68 0000000000
PEFZ PEX 1022691 O0 000 O0 0 17 1 1 4 68 0000000000
HNPO PEX US 1022691 O0 000 O0 0 17 1 1 4 68 0000000000
TT1 BHC US 1022691 O0 000 O0 0 17 1 1 4 68 0000000000
TT2 BHC US 1022691 O0 000 O0 0 17 1 1 4 68 0000000000
TT3 BHC US 1022691 O0 000 O0 0 17 1 1 4 68 0000000000
** DATA **
DEPT. 10086.000 RHOZ.PEX -999.250 HDRA.PEX -999.250 PEFZ.PEX -999.250
PflVPO. PEX 491.600 TT1.BHC 334.000 TT2.BHC 486.000 TT3.BHC 321.600
DEPT. 9734.834 RHOZ.PEX 2.592 HDRA.PEX -0.006 PEFZ.PEX
HNPO. PEX 552.800 TT1.BHC 376.800 TT2.BHC 555.200 TT3.BHC
4.089
370.000
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
52
**** FILE TRAILER ****
FILE NAFiE : EDIT .017
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .018
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NU~BER 18
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN ~ER : 1
TOOL STRING NUMBER: 1
PASS ~ER : 2
DEPTH INCREMENT: 0. 0833
FILE SUpKVlARY
VENDOR TOOL CODE START DEPTH
AIT 3420.0
PEX 3420.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
3104.0
3104.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
SDT ARRAY SONIC SONDE
PEX PLATFORM EXPRESS
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7O00.O
3000.0
6960.0
1800.0
TOOL NUF~ER
DSLC-B 817B
SLS-W 1408
HTBCC 794
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE
53
AIT
$
ARRAY INDUCTION TOOL
BOREHOLEAND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (F~:
LOGGERS CASING DEPTH (F~:
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
AIT-H 121
8.500
3104.0
3104.0
WATER BASED MUD
10.50
61.0
9.4
212.0
1. 890 65.0
1. 690 65.0
2.290 65.0
REMARKS: ************ RUN1 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDERRUNON THE AITH
ONE STANDOF RUN ONTHE AITH
BOWSPRING RUN ONNEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THE RAW (OPEN HOLE) REPEAT PASS DATA
ACQUITED AT O. 0833 ' SAMPLE RATE.
$
LIS FORMAT DATA
TOOL STANDOFF (IN): 1.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
54
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EH **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
5 66
6 73
7 65
8 68 0.083
9 65 FT
11 66 128
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 18 1 1 4 68 0000000000
HCAL PEX IN 1022691 O0 000 O0 0 18 1 1 4 68 0000000000
** DATA **
DEPTo 6984.000 HCAL.PEX 3.867
DEPT. 3104.000 HCAL.PEX 3.819
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .018
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 55
**** FILE HEADER ****
FILE NAME : EDIT .019
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE ~
FILE HEADER
FILE NUMBER 19
RAW OPEN HOLEREPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate files.
RUN NTJM~ER : 2
TOOL STRING NUMBER: 2
PASS NUMBER: 2
DEPTH INCREMENT: O. 0883
FILE S~Y
VENDOR TOOL CODE START DEPTH
PEX 10086.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
..........
9700.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX AUX. MEASUREMFa%FT
SDT SONIC CARTRIDGE
PEX PLATFORM EXPRESS
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
BOREHOLE CONDITIONS
MUD TYPE:
24-SEP-97
8C0-609
800 24-SEP-97
730 24-SEP-97
10187.0
9700.0
10140.0
TOOL NUMBER
AAMS-A 850
SDC-CB 17
HILTB-DTB
HTBCC 794
AIT-H 121
6.000
9700.0
9700.0
QUICK DRILN FLUID
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 56
MUD DENSITY (LB/G): 8.80
MUD VISCOSITY (S) : 54.0
MUD PH: 9.1
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF): 225.0
RESISTIVITY (0I~4~) AT TEMPERATURE (DEGF) :
MUD AT ~=AS~ TE~IPERATURE (MT): 0.102
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT): 0.106
MUD FILTRATE AT (BHT) '.
MUD CAKE AT (MT): 0.107
MUD CAKE AT (BHT):
65.0
65.0
65. 0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
2.65
TOOL STANDOFF (IN): 1.0
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
THIS IS THE TD LOGGING RUN FOR THIS WELL.
FOUR STANDOFFS RUN ON THE SONIC
HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG
ACQUIRED AT A O. 0883' SAMPLE RATE.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 8
4 66 1
5 66
6 73
7 65
8 68 O. 083
9 65 FT
11 66 128
12 68
13 66 0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 57
TYPE REPR CODE VALUE
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 19 1 1 4 68 0000000000
HCAL PEX IN 1022691 O0 000 O0 0 19 1 1 4 68 0000000000
** DATA **
DEPT. 10086.000 HCAL.PEX 4.172
DEPT. 9734.584 HCAL.PEX 6.343
** END OF DATA **
* * * * FILE TRAILER * * * *
FILE NAME : EDIT .019
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE '. LO
LAST FILE
**** FILE HEADER ****
FILE NAME : EDIT .020
SERVICE '. FLIC
VERSION · O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 20
RAW CASED HOLE MAIN PASS
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 58
Curves and log header data for open hole logs run into casing.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
PEX 3104.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
STOP DEPTH
2923.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
SDT ARRAY SONIC SONDE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT) :
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MA TRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.0
3000.0
6960.0
1800.0
TOOL NUMBER
...........
DSLC-B 817B
SLS-W 1408
HTBCC 794
AIT-H 121
8.500
3104.0
3104.0
WATER BASED MUD
10.50
61.0
9.4
212.0
1. 890 65.0
1. 690 65.0
2. 290 65.0
THERMAL
SANDSTONE
2.65
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE
59
TOOL STANDOFF (IN):
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THE RAW PEX DATA ACQUIRED AT 0.5' SAMPLE
RATE LOGGED UP INTO CASING.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 52
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 19
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NOWi~ SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
T~NS AIT LB 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
HTENAIT LB 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
GR AIT GAPI 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
CNTC PEX CPS 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
CFTC PEX CPS 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 60
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NIIM~ SAMP ELEM CODE (HEX)
RCFT PEX CPS 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
RCNT PEX CPS 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
TNRA PEX 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
RTNR PEX 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
NPOR PEX PU 1022691 O0 000 O0 0 20 I 1 4 68 0000000000
NPHI PEX PU 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
TNPH PEX PU 1022691 O0 000 O0 0 20 1 1 4 68 0000000000
** DATA **
DEPT. 3104.000 TENS.AIT 2121.000 HTEN. AIT 1047.560 GR.AIT 71.002
CNTC.PEX 2024.896 CFTC. PEX 603.870 RCFT. PEX 539.786 RCNT. PEX 1917.423
TNRA.PEX 3.494 RTNR.PEX 3.611 NPOR.PEX 39.190 NPHI.PEX 48.533
TNPH. PEX 40.408
DEPT. 2945.000 TENS.AIT 2127.000 HTEN. AIT 1036.851 GR.AIT 46.927
CNTC. PEX 1340.739 CFTC. PEX 376.399 RCFT. PEX 350.570 RCNT. PEX 1280.803
TNRA.PEX 3.683 RTNR.PEX 4.353 NPOR.PEX 40.790 NPHI.PEX 51.967
TNPH. PEX 43.762
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .020
SERVICE · FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .021
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUI~BER
21
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 61
RAW CASED HOLE MAIN PASS
Curves and log header data for open hole logs run into casing.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SURk~ARY
VENDOR TOOL CODE START DEPTH
PEX 9700.0
$
LOG HEADER DATA
STOP DEPTH
9578.0
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PEX AUX. MEASUREMENT
SDT SONIC CARTRIDGE
PEX PLATFORM EXPRESS
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) '.
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (Otff~4) AT TEMPERATURE (DEGF) :
MUD AT I~EASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
24-SEP-97
8C0-609
800 24-SEP-97
730 24-SEP-97
0.0
10187.0
9700.0
10140.0
1800.0
TOOL NUMBER
...........
AAMS-A 850
SDC-CB 17
HILTB-DTB
HTBCC 794
AIT-H 121
6. 000
9700.0
9700.0
QUICK DRILN FLUID
8.80
54.0
9.1
225.0
O. 102 65.0
O. 106 65.0
0.107 65.0
THERMAL
SANDSTONE
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 62
MATRIX DENSITY:
HOLE CORRECTION (IN):
2.65
TOOL STANDOFF (IN): 1.0
RE~IARI~S: ************ RUN 2
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
THIS IS THE TD LOGGING RUN FOR THIS WELL.
FOUR STANDOFFS RUN ON THE SONIC
HOLE IS 30 DEG DEVIATED TO CASING SHOE THEN DROPS TO 5 DEG
DATA SAMPLED AT 0.5' RATE LOGGED UP INTO CASING.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 24
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 42
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE ~ ~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NOWi~ SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 21 1 i 4 68 0000000000
TENS AIT LB 1022691 O0 000 O0 0 21 1 1 4 68 0000000000
GR AIT GAPI 1022691 O0 000 O0 0 21 1 1 4 68 0000000000
CNTC PEX CPS 1022691 O0 000 O0 0 21 1 1 4 68 0000000000
CFTC PEX CPS 1022691 O0 000 O0 0 21 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
63
NAME SERVUNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
NPHI P~ PU 1022691 O0 000 O0 0 21 1 1 4 68 0000000000
* * DA TA * *
DEPT. 9700. 000 TENS.AIT 5290. 000
CFTC.PEX 1036.842 NPHI. PEX 23.349
DEPT. 9575. 500 TENS.AIT 5392. 000
CFTC. PEX 372.942 NPHI. PEX 39.962
GR.AIT 49. 396 CNTC. PEX 2210. 464
GR. AIT 93.166 CNTC. PEX
1280.559
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .021
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
**** FILE HEADER ****
FILE NAME : EDIT .022
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 22
RAW CASED HOLE MAIN PASS
Curves and log header data for open hole logs run into casing.
PASS NUFIBER: 1
DEPTH INC~: 0.1667
FILE SUMMARY
VEJVDOR TOOL CODE START DEPTH STOP DEPTH
PEX 3104.0 2923.0
$
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 64
LOG HEADER DATA
DATE L~ED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
TOOL STRING (TOP TO BOTTOM)
VEJFDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
SDT ARRAY SONIC SONDE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF)
RESISTIVITY (OH~M) AT TEMPERATURE (DEGF)
MUD AT M~%S~ TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.O
3000.0
6960.0
1800.0
TOOL NUMBER
DSLC-B 817B
SLS-W 1408
HTBCC 794
AIT-H 121
8.500
3104.0
3104.0
WATER BASED MUD
10.50
61.0
9.4
212.0
1. 890 65.0
1. 690 65.0
2. 290 65.0
THERMAL
SANDSTONE
2.65
************ RUN 1 *************
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ONTHE AITH
BOWSPRING RUN ONNEUTRON FOR ECCENTRALIZATION
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 65
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THE RAW PEX DATA ACQUIRED AT 0.1667' SAMPLE
RATE LOGGED UP INTO CASING.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 32
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 32
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN**
NAME SERV UNIT SERVICE API API API API FILE NUMB ~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 22 1 1 4 68 0000000000
HCNT PEX CPS 1022691 O0 000 O0 0 22 1 1 4 68 0000000000
HCFT PEX CPS 1022691 O0 000 O0 0 22 1 1 4 68 0000000000
HGR PEX GAPI 1022691 O0 000 O0 0 22 1 1 4 68 0000000000
RHFT PEX CPS 1022691 O0 000 O0 0 22 1 1 4 68 0000000000
RI{NT PEX CPS 1022691 O0 000 O0 0 22 1 1 4 68 0000000000
HTNP PEX PU 1022691 O0 000 O0 0 22 1 1 4 68 0000000000
HNPO PEX PU 1022691 O0 000 O0 0 22 1 1 4 68 0000000000
** DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 66
DEPT. 3104.000 HCNT. PEX
RHFT. PEX 516.021 RHNT.PEX
DEPT. 2945.333 HCNT.PEX
RHFT. PEX 305.852 RtINT.PEX
2018.829 HCFT.PEX
1904.683 HTNP. PEX
1336.217 HCFT. PEX
1382.576 HTNP.PEX
600.059 HGR.PEX
40.587 HNPO. PEX
363.253 HGR.PEX
45.650 HNPO. PEX
70.346
39.531
44.521
49.010
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .022
SERVICE : FLIC
VERSION . O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .023
SERVICE : FLIC
VERSION . O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE~ER 23
RAW CASED HOLEREPEAT PASSES
Curves and log header data for each pass in separate files.
PASS--ER: 2
DEPTH INCREMENT: 0.5000
FILE SUN~4~Y
VENDOR TOOL CODE START DEPTH STOP DEPTH
PEX 3104.0 2923.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TDDRILLER (FT):
TD LOGGER(FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7OOO.O
3000.0
6960.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE:
67
LOGGING SPEED (FPHR):
1800.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
SDT ARRAY SONIC SONDE
PEX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
TOOL NUMBER
DSLC-B 817B
SLS-W 1408
HTBCC 794
AIT-H 121
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
8.500
3104.0
3104.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF) :
RESISTIVITY (OH~I) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT) :
MUD CAKE AT (MT):
MUD CAKE AT (BHT):
WATER BASED MUD
10.50
61.0
9.4
212.0
1. 890 65.0
1.690 65.0
2. 290 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) : THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): 1.0
P~M~D~S: ************ RUN 1 *****sc*******
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THE RAW PEX DATA ACQUIRED AT 0.5000' SAMPLE
RATE LOGGED UP INTO CASING.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT~1997 11:33
PAGE:
68
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 52
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 19
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA2~E SERV UNIT SERVICE API API API API FILE NUA~ NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
TENS AIT LB 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
HTENAIT LB 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
GR AIT GAPI 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
CNTC PEX CPS 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
CFTC PEX CPS 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
RCFT PEX CPS 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
RCNT PEX CPS 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
TNRA PEX 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
RTNR PEX 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
NPOR PEX PU 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
NPHI PEX PU 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
TNPH PEX PU 1022691 O0 000 O0 0 23 1 1 4 68 0000000000
** DATA **
DEPT. 3104.000 TENS.AIT 2121.000 HTEN. AIT 1047.560 GR.AIT
CNTC. PEX 2024.896 CFTC.PEX 603.870 RCFT. PEX 539.786 RCNT. PEX
TNRA.PEX 3.494 RTNR.PEX 3.611 NPOR.PEX 39.190 NPHI.PEX
TNPH. PEX 40.408
71.002
1917.423
48.533
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 69
DEPT. 2945.000 TENS.AIT
CNTC.PEX 1340.739 CFTC. PEX
TN~A.PEX 3.683 RTNR.PEX
TNPH. PEX 43.762
2127.000 HTEN. AIT
376.399 RCFT. PEX
4.353 NPOR.PEX
1036.851 GR.AIT
350.570 RCNT. PEX
40.790 NPHI.PEX
46.927
1280.803
51.967
** END OF DATA **
**** FILE TRAILER ****
FILE NAM~ : EDIT .023
SERVICE · FLIC
VERSION · O01CO1
DATE · 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .024
SERVICE : FLIC
VERSION : O01CO1
DATE . 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE1VUM~ER 24
RAW CASED HOLE REPEAT PASSES
Curves and log header data for each pass in separate files.
PASS NUM~ER: 2
DEPTH INCRE~IENT: 0.1667
FILE SUN~V~RY
VENDOR TOOL CODE START DEPTH STOP DEPTH
PEX 3104.0 2923.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TI~E CIRCULATION ENDED:
TI~E LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER(FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
20-SEP-97
8C0-609
800 20-SEP-97
2345 20-SEP-97
9713.0
7000.0
3000.0
6960.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 70
LOGGING SPEED (FPHR) :
1800.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
BHC BOREHOLE SONIC CARTR.
SDT ARRAY SONIC SONDE
PBX PLATFORM EXPRESS
AIT ARRAY INDUCTION TOOL
$
TOOL NUMBER
DSLC-B 817B
SLS-W 1408
HTBCC 794
AIT-H 121
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) '.
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT):
8.500
3104.0
3104.0
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF)
RESISTIVITY (OPAl4) AT TEMPERATURE (DEGF)
MUD AT ~ASURED TEMPERATURE (MT)
MUD AT BOTTOM HOLE TEMPERATURE (BHT)
MUD FILTRATE AT (MT):
MUD FILTRATE AT (BHT):
MUD CAKE AT (MT):
MUD CAKE AT (BHT) :
WATER BASED MUD
10.50
61.0
9.4
212.0
1. 890 65.0
1. 690 65.0
2. 290 65.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL): THERMAL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): 1.0
RE~AR~S: ************ RUN 1
NABORS 18E
THIS IS A PRIMARY DEPTH LOG
HOLEFINDER RUN ON THE AITH
ONE STANDOF RUN ON THE AITH
BOWSPRING RUN ON NEUTRON FOR ECCENTRALIZATION
FOUR STANDOFFS RUN ON THE SONIC
BRIDGED AT 7000 FT - LOGGED OUT FROM BRIDGE.
THIS IS THE RAW PEX DATA ACQUIRED AT 0.1667' SAMPLE
RATE LOGGED UP INTO CASING.
$
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 71
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 32
4 66 1
5 66
6 73
7 65
8 68 0.166
9 65 FT
11 66 32
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NOWB SAMP ELEM CODE (HEX)
DEPT FT 1022691 O0 000 O0 0 24 1 1 4 68 0000000000
HCNTPEX CPS 1022691 O0 000 O0 0 24 1 1 4 68 0000000000
HCFT PEX CPS 1022691 O0 000 O0 0 24 1 1 4 68 0000000000
HGR PEX GAPI 1022691 O0 000 O0 0 24 i 1 4 68 0000000000
RHFT PEX CPS 1022691 O0 000 O0 0 24 1 1 4 68 0000000000
PJ4NTPEX CPS 1022691 O0 000 O0 0 24 1 1 4 68 0000000000
HTNP PEX PU 1022691 O0 000 O0 0 24 1 1 4 68 0000000000
HNPO PEX PU 1022691 O0 000 O0 0 24 1 1 4 68 0000000000
** DATA **
DEPT. 3104.000 HCNT. PEX 2018.829 HCFT. PEX 600.059 HGR.PEX
RHFT. PEX 516.021 RHNT.PEX 1904.683 HTNP.PEX 40.587 HNPO. PEX
DEPT. 2945.333 HCNT. PEX 1336.217 HCFT. PEX 363.253 HGR.PEX
RHFT. PEX 305.852 R3HCT. PEX 1382.576 HTNP.PEX 44.137 HNPO.PEX
70.346
39.531
44.521
41.846
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
15-0CT-1997 11:33
PAGE: 72
* * * * FILE TRAILER * * * *
FILE NAME : EDIT .024
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/10/15
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 97/10/15
ORIGIN : FLIC
TAPE NAi~E : 97440
CONTINUATION # : 1
PREVIOUS TAPE :
COM~N=f · B.P. EXPLORATION, Z-03, PRUDHOE BAY, API #50-029-22787-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE . 97/10/15
ORIGIN · FLIC
REEL NA~iE : 97440
CONTINUATION # :
PREVIOUS REEL
COM~iENT : B.P. EXPLORATION, Z-03, PRUDHOE BAY, API #50-029-22787-00