Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout197-144STATE OF ALASKA ~~~ ~ RECEIVED ALASK~IL AND GAS CONSERVATION CON'IICRSSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG APR 0 2 2008 1a. Well Status: ^ Oil ^ Gas ^ Plugged ®Abandoned ^ Suspended zoAACZS.,os zoAACZS.,,o ^ GINJ ^ WINJ ^ WDSPL ^ WAG ^ Other No. of Completions Zero 1b. Well Class:~~~~~~hh~~± ®DeveloprYr~tlf'L'Tt~cploratory ^ Service ^ Stratigraphic 2. Operator Name: BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aband. 3/4/2008 ~ 12. Permit to Drill Number 197-144 ~ 308-024 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded 08/30/1997 13. APl Number 50-029-22769 01-00 4a. Location of Well (Governmental Section): Surface: ' ' 7. Date T.D. Reached 09/04/1997 14. Well Name and Number: P2-45A - 398 FNL, 1296 FWL, SEC. 14, T12N, R14E, UM Top of Productive Horizon: 4439' FNL, 1238' FWL, SEC. 18, T12N, R15E, UM 8. KB (ft above MSL): 46.2' Ground (ft MSL): 10.8' 15. Field /Pool(s): Prudhoe Bay Field /Point Total Depth: 4516' FNL, 1485' FWL, SEC. 18, T12N, R15E, UM 9. Plug Back Depth (MD+TVD) 15320' 9130' McIntyre Pool 4b. Location of Well (State Base Plar-e Coordinates, NAD 27): Surface: x- 681542 y- 5998185 Zone- ASP4 10. Total Depth (MD+TVD) 15417' 9187' 16. Property Designation: ADL 034627 TPI: x- 692143 y- 5994408 Zone- ASP4 Total Depth: x- 692392 y- 5994338 Zone- ASP4 11. SSSV DeN A(MD+TVD) 17. Land Use Permit: 18. Directional Survey ^ Yes ®No Submit electronic and rinted information er 20 AAC 25.050 19. Water depth, if offshore N/A ft MSL 20. Thickness of Permafrost (TVD): 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): MWD, LWD, GR / RES /DEN / NEU 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH`TVD HOLE AMOUNT WT. PER FT. GRADE TOP BOTTOM ` TOP' .BOTTOM SIZE CEMENTING RECORD PULLED 20" 133# H-40 35' 110' 35' 110' 30" 260 sx Arctic Set A rox. 9-5/8" 40# L-80 34' 6992' 34' 4967' 12-1/4" 1761 sx Coldset III 644 sx Class'G' 7" 26# / 29# L-80 / 13Cr80 31' 15406' 31' 9181' 8-1 /2" 335 sx Class 'G' 23. Open to production or inject ion? ^ Yes ®NO 24, TUBING RECORD If Yes, list each i (MD+TVD of Top & Bottom; Pe nterval open rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD N/A MD TVD MD TVD ( ~ 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. ~l~(~ ( q ~r1n-++Y~C~19Li~~ ~~~ ~ ~ 208 DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED 15147' Set EZSV 15141' P&A w/ 16.5 Bbls Class 'G' 15124' Set Whipstock 26. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, Gas Lift, etc.): N/A Date Of Test: HOUrS Tested: PRODUCTION FOR TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Flow Tubing PreSS. Casing Press: CALCULATED 24-HOUR RATE OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK): 27. CORE DATA Conventional Core(s) Acquired? ^ Yes ®No Sidewal l Cores Ac uired? ^ Yes ®No If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. ~~ Y,~.: ~T`:0~ None '; ,8 V .~ Form 10-407 Revised 02/2007 ~ , 1 ONTINUED ON REVERSE SIDE Y 28. GEOLOGIC MARKERS (LIST ALL FORMATIONS A KERS ENCOUNTERED): 29. FORMATION TESTS NAME TVD Well Teste ^ Yes ®No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. Kalubik 15010' 8940' None Zone LC1 15093' 8992' Zone LB3 15198' 9056' Formation at Total Depth (Name): 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram 31. I hereby certify that the fore oing is true and correct to the best of my knowledge. Si d O ~ D ~ gne Title Drilling Technologis# Date Terrie Hubble P2-45A 197-144 308-024 Prepared By Name/Number. Terrie Hubble, 564-4628 Well Number Drilling Engineer: Phil Smith, 564-4897 Permit No. / A royal No. INSTRUCTIONS GeNeRA~: This form is designed for submitting a complete and correct welt completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. IreM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. IreM 4b: TPI (Top of Producing Interval). IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 02/2007 Submit Original Only [Rlc~~~i~ ~ . Page 1 of 1 Well History Well Date Summary P2-45A 1/22/2008 **' WELL SI ON ARRIVAL *** (pre ctd) DRIFT W/TEL, 2.50" CENT & S. BAILER...LOC TTL ~ 14,914' SLM +17' = 14.931' ELMD, TAG TD (hrd btm) ~ 15,265' ELMD = 40' OF RAT HOLE...SMALL AMOUNT OF PARRAFIN & FORMATION SAND IN S. BAILER RAN 2.50" CENT & PETRADAT SBHPS AS PER PROGRAM...GOOD DATA *** WELL LEFT S/I *`* P2-45A 1/29/2008 ***WELL S/I ON ARRIVAL*** (drift tbg for plug/pre sdtrk) R/U S/L UNIT, ***CONT JOB ON 1-30-08*** P2-45A 1/30/2008 *** CONT JOB FROM 01-29-08 *** (drift tbg for plug/pre sdtrk) DRIFT OUT THE END OF THE TT (LOCATED AT 14927' SLM) W/ 3.70" CENT & S-BAILER. NO OBSTRUCTIONS OBSERVED. S-BAILER EMPTY. *** WELL S/I ON DEPARTURE, NOTIFY DSO'** P2-45A 2/2/2008 T/I/0=250/560/0 Assist E-line with MIT T Passed to 3500 si on lu (Rig ST prep) T presured up to 3500 psi with 4.3 bbls neat metharioTf ost 0 psi in first 15 minutes and 20 psi in second 15 minutes. For a total of 60 psi in 30 minutes. Bled pressure down to 100 psi. E-line on well at departure. FW H P's=100/580/0 P2-45A 2/2/2008 ****WELL SHUT-IN ON ARRIVAL***' (E-LINE SET PLUG AND JET CUT). INITIAL T/I/O: 500/600/0. RIH W/ 4.5" BAKER QUCIKDRILL BP. STUCK WITH PLUG AT WLEGL, SET PLUG MID ELEMENT AT 14.935'. LRS TESTED TO 3500 PSI FOR 30 MINS, PASSED. CUT TUBING WITH 3.65" JET CUTTER AT 14.885'. FINAL T/I/O = 150/600/0 *'**JOB COMPLETE*`** P2-45A 2/3/2008 T/I/0=700/700/0, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS). Pre Rig. PPPOT-T: Stung into test port to check pressure (750 psi), bled to 0 psi. Function LDS (ET style), all moved freely with no sign of bent or broken pins. Pumped through void until clean returns were achieved. Pressured void to 5000 psi for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled to 0 psi. PPPOT-IC: Stung into test port to check pressure (800 psi), bled to 0 psi. Function LDS (ET style), all moved freely with no sign of bent or broken pins. Pumped through void until clean returns were achieved. Pressured void to 3500 psi for 30 min test, lost 0 psi in 30 min (PASS). Bled to 0 psi. P2-45A 2/13/2008 Circ well, CMIT TxIA to 3500 psi, MIT OA to 2000 psi (Rig ST prep) Load diesel and road to location. Job in progress, continued on 02-14-2008 P2-45A 2/14/2008 ***Continued from 02-13-08*** T/I/0=300(1100/0 Temp=S/I Circ Well, CMIT TxIA PASSED to 3500 psi, MIT OA PASSED to 2000 psi. (Rig ST prep) Pumped 5 bbls Neat meth followed by 750 bbls 9.6 ppg brine down Tbg taking returns up IA through jumper loop to flowline. Pumped 20 bbls warm diesel into Tbg. U-tubed to freeze protect well. Freeze Protect flowline withl0 bbls neat meth. CMIT Tx IA to 3500 psi..Pumped 4.8 bbls diesel to reach 3500 psi..lst 15 min T/IA lost 0/70 psi, 2nd 15 min T/IA lost 20/0 psi, 3rd 15 min T/IA lost 0/0 psi for a total loss of 20/70 psi in 45 min. Bleed T/IA psi down, bled -5 bbls. MIT OA to 2000 psi..Pumped 7.7 bbls crude into OA to reach 2000 psi..lst 15 min OA lost 70 psi, 2nd 15 min OA lost 0 for a total loss of 70 psi in 30 min. Bled OA. Bled back - 2.5 bbls. Final Whp's=0/0/0 P2-45A 2/15/2008 ,Set 4 1/16" CIW H BPV pre-rig for 7ES.Tagged X100".....no problems. Print Date: 4/1/2008 Page 1 of 1 http://digitalwellfile.bpweb.bp.com/Wllnfo/Reports/ReportViewer.aspx 4/1/2008 • • BP EXPLORATION Page 1 of 15 Operations Summary Report Legal Well Name: P2-45 Common Well Name: P2-45 Spud Date: 4/14/1997 Event Name: REENTER+COMPLETE Start: 2/26/2008 End: 3/22/2008 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 3/22/2008 Rig Name: NABORS 7ES Rig Number: Date From - To Hours Task Code NPT Phase., Description of Operations 2/25/2008 19:00 - 00:00 5.00 MOB P PRE RD. Stage rig to edge of D-Pad. Prepare for rig move. 2/26/2008 00:00 - 09:30 9.50 MOB P PRE Move rig f/D-26B to Pt Mac 2-456. Pits, truckshop and Iliamna Camp on location at 02:30. Sub left D-Pad road to Spine Rd. at 02:30. 09:30 - 20:00 10.50 RIGU P PRE Lay matting boards and herculite. Hang tree in cellar and spot wellhead equipment around P2-45. PJSM with hands. Spot sub over well. Spot pits and lay mats. Inspect the derrick. Raise the derrick. Bridle down. Prep rig floor and rig up service lines from pits to rig. 20:00 - 21:00 1.00 WHSUR P DECOMP Accept riq C~ 20:00 hours on 2/26/2008. Rig up circulating lines in cellar. Bring on 9.0 ppg brine. 21:00 - 22:00 1.00 WHSUR P DECOMP PJSM with hands. IA pressure: 0 psi. OA pressure: 0 psi. Test lines to 3500 psi. RU hydraulic lines and open SSV. U and test DSM lubricator to 500 si. Good test Pull BPV. RD lubricator and test equipment. 22:00 - 00:00 2.00 WHSUR P DECOMP PJSM with WSL and hands. Reverse circulate 10 bbls of 9.0 ppg brine. 2 bpm, 270 psi. RU to pump down tubing taking returns from IA. Pump 110 gallons of Safe Surf O. Displace 9.6 ppg brine with 9.0 ppg brine. 308 gpm, 1950 psi. 2/27/2008 00:00 - 01:30 1.50 WHSUR P DECOMP Continue to displace well with 9.0 ppg brine. 308 gpm, 1950 psi. 01:30 - 02:30 1.00 WHSUR P DECOMP U to OA and um 3 bbls to ressure test OA to 2000 si. Hold and chart for 30 minutes. Good test. RD lines and bleed OA to zero psi. 02:30 - 03:00 0.50 WHSUR P DECOMP Set TWC. ~ Test TWC from below to 1000 psi for 5 minutes. 03:00 - 05:00 2.00 WHSUR P DECOMP ND tree and adapter ange. Cut two stainless steel control lines. Verify good condition of 4-1/2" NSCT threads on tubing hanger. 05:00 - 06:30 1.50 BOPSU P DECOMP NU BOPE. 06:00 - 11:30 5.50 BOPSU N SFAL DECOMP Remove the air boot flange. ND annular cap. Replace the seals and element in the annular. 11:30 - 14:00 2.50 BOPSU P DECOMP Install air boot flange. Finish NU BOPE. RU test equipment. 14:00 - 19:00 5.00 BOPSU P DECOMP ressure test BOPE and Koomey Test 250 psi low and 3500 psi high. Test with 4" and 4.5" test joints. Test witness by Nabors Tool Pusher Biff Perry and BP WSL Mike Dinger. Test witness waived by AOGCC rep Lou Grimaldi. Upper IBOP failed to test. 19:00 - 21:00 2.00 BOPSU N RREP DECOMP Remove IBOP from the top drive and rebuild. Install the repaired IBOP 21:00 - 00:00 3.00 BOPSU P DECOMP pressure test from 250 psi low to 3500 psi high. Test witnessed by Nabors Tool Pusher Biff Perry and BP WSL Kris Honas. Close annular around extension and pressure test to 300 psi. rnntea: aicncwa ~ao:u nw • BP EXPLORATION Page 2 of 15 Operations Summary Report Legal Well Name: P2-45 Common Well Name: P2-45 Spud Date: 4/14/1997 Event Name: REENTER+COMPLETE Start: 2/26/2008 End: 3/22/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/22/2008 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code NPT 'Phase Description of Operations 2/27/2008 21:00 - 00:00 3.00 BOPSU P DECOMP Pull TWC. Blow down lines and rig down test equipment. 12/28/2008 00:00 - 00:30 0.50 BOPSUF{ P 00:30 - 02:30 2.00 PULL I P 02:30 - 18:00 I 15.50 I PULL I P 18:00 - 19:00 I 1.001 BOPSUR P 19:00 - 20:00 1.00 ~ BOPSUF~ P 20:00 - 21:30 I 1.501 FISH I P 21:30 - 00:00 2.50 FISH P 2/29/2008 00:00 - 10:30 10.50 FISH P 10:30 - 15:00 I 4.501 FISH I P 15:00 - 16:00 I 1.001 FISH I P 16:00 - 17:00 I 1.001 FISH I P 17:00 - 18:30 ~ 1.50 ~ FISH ~ P DECOMP LD Lubricator and 7" Extension. DECOMP RU to pull tubing hanger. Stage SLB spooling unit on rig floor. MU 4.5" NSCT crossover to joint of drillpipe. Engage hanger and back out lock down screws. Pick up 158K to release tubing hanger. Pull hanger to floor and cut two stainless steel contol lines and PU = 152K. DECOMP POOH and lay down 4.5", 12.6#, Cr-80, NSCT tubing. Spool up control lines and count stainless steel bands. RD control line spooler after pulling 54 joints. Recovered 11 bands total. Continue to POOH with tubing. LD 352 joints, 8 GLM's, and SSSV. Recoved 5.27' cut off joint. 4.39' stub left in well on first pup joint above packer. Recovered some 1' to 5' peices of control line in the stack. DECOMP PU a jet tool and jet the BOP stack to remove any possible debri or peices of control line. Function rams and blow down lines. DECOMP RU test equipment and test bottom pipe rams with a 4" test joint from 250 psi low to 3500 psi high for 5 minutes. Good test. Test witnessed by Nabors Driller Dave Johnston and BP WSL Kris Honas. DECOMP PJSM with hands and Baker Fishing. PU Baker packer milling assembly with 6" packer mill, 4 boot baskets, float sub, pump out sub, jars, and 9 drill collars. RIH to 319'. DECOMP RIH with Baker packer mill picking up 60, 4" drill pipe singles. DECOMP Continue to RIH with packer mill picking up 4" drill pipe singles. Fill drill pipe every 30 stands. Tacl tubing stump at 14905'. PU = 200K, SO = 135K DECOMP dill the tubing stump and packer while circulating. 7 BPM, 1740 psi ~ o .5R='i'4.5K TO on, ROT WT 152K. Mill from 14905' to 14916'. Pumped a 25 bbl super sweep while milling. Sweep returned a small amount of metal cuttings. DECOMP Mill through packer element. Packer free. CBU. 340 bbls, 7 bpm, 1700 psi, 60 RPM, 9K TO. Circulated residual gas from below packer out through choke. DECOMP ~ Continue to RIH picking up DP singles. To of fish at 15,246' PU 205K, SO 135K. DECOMP Pump a 25 bbl Super Sweep pill and circulate the wellbore Printetl: 3/27/2008 1:SS:Z1 PM • • BP EXPLORATION Page 3 of 15 Operations Summary Report Legal Well Name:- P2-45 Common Well Name: P2-45 Spud Date: 4/14/1997 Event Name: REENTER+COMPLETE Start: 2/26/2008 End: 3/22/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/22/2008 Rig Name: NABOBS 7ES Rig Number: ' Date From - To Hours Task Code NPT Phase Description of Operations 2/29/2008 17:00 - 18:30 1.50 FISH P DECOMP clean while rotating and reciprocating pipe. 542 bbls, 305 GPM, 1710 psi, 60 RPM, 9.5K TO, ROT WT 152K. 18:30 - 00:00 5.50 FISH P DECOMP Monitor the well for 15 minutes. Pump a dry job and blow down top drive. Remove blower hose. POOH from 15,246' to 4870'. 45 bbls of brine total. 3/1/2008 00:00 - 01:45 1.75 FISH P DECOMP Continue to POOH with 4" drill pipe racking back stands in the derrick to 319'. 01:45 - 03:00 1.25 FISH P DECOMP LD packer milling BHA. LD 9 collars, jars, pump out sub, float sub, 4 boot baskets, and 6" packer mill. 03:00 - 11:00 8.00 DHB N WAIT DECOMP 11:00 - 11:30 0.50 DHB P DECOMP 11:30 - 17:00 5.50 DHB P DECOMP 17:00 - 21:00 4.00 DHB P DECOMP 21:00 - 21:30 0.50 DHB P DECOMP 21:30 - 00:00 2.50 DHB P DECOMP Recovered -50 Ibs of debis in boot baskets, including bands and control line. Mill in good condition. Wait on temperature to increase above -40 degrees F to rig up SLB E-line for gauge ring, junk basket, gamma ray and CCL run. Rig up SLB E-line. Rig up sheeves. Make up 6" gauge ring, junk basket, CCL and gamma ray. RIH with GR/JB and CCUGR to 15,250' working through tight spots. POOH with E•line. Junk basket contained a SS band and 10" peice of control line. Make up 5.9" gauge ring and RIH with E-line to 15,200. Log hole to 13,100'. POOH with E-line. Junk basket empty. PJSM with rig hand, SLB, and Halliburton. Arm SLB explosives. Make up HES EZSV squeeze packer. RIH with HES EZSV on SLB E-line past proposed setting depth of 15,146'. Log up and correlate depths. 3/2/2008 00:00 - 00:30 0.50 DHB P DECOMP Continue to correlate gamma ray depth. Upper dogs on EZSV sheared prematurely. Unable to move EZSV up. RIH and set EZSV on down stroke due to sheared dog. Ta EZSV after releasin and confirm de th. To of EZSV at 15,147' 55' below to of Ku aruk . 00:30 - 03:00 2.50 DHB P DECOMP POOH with SLB E-line and rig down. 03:00 - 10:30 7.50 PXA P DECOMP - RU to RIH with cement stinger on 4" drillpipe. - Pick up 15 singles of 4", 14#, HT-40 drill pipe. - Continue to RIH on 4" drillpipe stands to 15,126'. Check pump parameters: 1 BPM - 60 psi, 2 BPM 145 psi, 3 BPM 290 psi, 4 BPM 460 psi. - Continue RIH & tag top of EZSV ~ 15,144', PU 200K, SO rnmeu: aic ncvuo i.oa.c~ rm • • BP EXPLORATION Page 4 of 15 Operations Summary Report Legal Well Name: P2-45 Common Well Name: P2-45 Spud Date: 4/14/1997 Event Name: REENTER+COMPLETE Start: 2/26/2008 End: 3/22/2008 ',Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/22/2008 Rig Name: NABOBS 7ES Rig Number: r Date From -To Hours Task Code NPT Phase Description of Operations 3/2/2008 03:00 - 10:30 7.50 PXA P DECOMP 130K. Sting into EZSV and establish infectivity. 1 BPM 103 psi, 2 BPM 225 psi, 3 BPM 425 psi. Returns observed at flow line and above EZSV. -RU head pin and cement hose. 10:30 - 13:30 3.00 PXA N CEMT DECOMP -Abandonment slurry changed from 17ppg to 15.8 ppg 4.5 hours prior to the job being pumped. Thickening times and consistency on the 17 ppg blends tested were not acceptable, therefore the last minute change to 15.8 ppg. Waited for test results on the 15.8 ppg prior to pumping. -Replaced the top drive brake valve block and serviced the rig while waiting on cement lab. 13:30 - 15:00 1.50 PXA P DECOMP -Pump 5 bbls of water and test lines to 3500 psi. - Pump 16.5 bbls of 15.8 ppg Class G cement at 3 BPM, followed by 5 bbls of water and 130 bbls 9.0 ppg brine while holding 500 psi back pressure on annulus with annular preventer and taking returns through the choke. - Sting into EZSV open annular preventer, and squeeze 11 ~~ Is cement into o en erfs ~ 2 BPM, 400 si. - Unstina from EZSV. clear 2 bbls of cement from DP, and rac 15:00 - 16:30 1.50 PXA P DECOMP -POOH to 14,963' and CBU at 10 BPM 2800 psi - no losses. Estimated 1.5 bbls of contaminated cement back on B/U with a maximum PH ®11.9 and a maximum MW ~ 9.6 ppg. 16:30 - 21:30 5.00 PXA P DECOMP Pump a dry job and blow down top drive. POOH from 14,963' and lay down cement stinger. Monitor well: static. Clean and clear the rig floor. 21:30 - 22:30 1.00 CLEAN P DECOMP Make up a clean out BHA to dress off cement to top of EZSV and ensure a 6-1/8" bit will pass through 7", 29# csg. BHA includes: Used 6" bit, bit sub, 6-1/8" string mill, boot basket, float sub, pump out sub, string magnet, jars, and 9 drill collars. 22:30 - 00:00 1.50 CLEAN P DECOMP RIH with clean out BHA on 4" drill pipe stands to 3337' filling pipe every 30 stands. 3/3/2008 00:00 - 01:30 1.50 CLEAN P DECOMP Continue to RIH with clean out BHA on 4" drill pipe to 7907'. 01:30 - 02:30 1.00 CLEAN P DECOMP PJSM with rig hands. Slip and cut 150' of drilling line. Inspect draw works and service top drive. 02:30 - 05:00 2.50 CLEAN P DECOMP Continue to RIH to 14,610' with clean out BHA. RU blower hose. Obtain drilling parameters: PU 190K, SO 125K, 2020 psi at 7 BPM, ROT WT 151 K, 8.8K TO at 60 RPM. 05:00 - 06:30 1.50 CLEAN P DECOMP Continue to RIH. Ta u at 14,884'. work i e down to 14 993': 240 GPM, 80 RPM, 1750 psi, WOB 5K,. POOH 1 stand. 06:30 - 08:00 1.50 CLEAN P DECOMP RU to pressure test 7" casing to 3500 psi. Good test -lost 300 08:00 - 10:00 2.00 CLEAN P DECOMP Drill cement from 14,993' to 15,085'. Torque increased to 15K ft-Ibs. Pick up one stand and circulate a 50 bbl Steel Lube pill.. rnmeu: .vuicvvo i.oo.c i rm ~7'I P~ • BP EXPLORATION Page 5 of 15 Operations Summary Report Legal Well Name: P2-45 Common Well Name: P2-45 Spud Date: 4/14/1997 Event Name: REENTER+COMPLETE Start: 2/26/2008 End: 3/22/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 3/22/2008 Rig Name: NABOBS 7ES Rig Number: Date From - To Hours Task Code NPT Phase ' Description of Operations 3/3/2008 10:00 - 10:30 0.50 CLEAN P DECOMP Continue to drill cement with 6-1/8" mill to top of ESSV ~ 15,141'. PU 215K, SO 118K, ROT 150K, WOB 10K, 14K TO, 80 RPM. 260 GPM, 1875 psi. 10:30 - 12:00 1.50 CLEAN P DECOMP Displace the well to 9.6 ppg Flo Pro SF milling fluid. 3650 psi, 405 GPM, 20 RPM, PU 180, SO 135K. Monitor the well for 15 minutes. 0.5 bph static loss rate. 12:00 - 17:30 5.50 CLEAN P DECOMP POOH with clean out BHA from 15,141' to 13,623'. Shutdown and monitor well due to incorrect hole fill. Static loss rate 0.5 b h. Continue to P to 321 . 17:30 - 19:00 1.50 CLEAN P DECOMP LD 6-1/8" clean out BHA including: 6" bit, 6-1/8" mill, string magnet, and jars. Rack back 3 stands of drill collars. String magnet covered in 1" x 1" x 1/16" pieces of metal. 19:00 - 21:00 2.00 STWHIP P WEXIT PJSM with hands. PU Baker 7" whi stock BHA MU and orient the MWD tools. PU 12 joints of HW drill pipe. RIH to 754'. 21:00 - 00:00 3.00 STWHIP P WEXIT RIH with 7" whipstock assembly at 90 seconds per stand to 5584'. Shallow test the MWD at 1224', 250 GPM, 730 psi. 3/4/2008 00:00 - 05:30 5.50 STWHIP P WEXIT Continue to RIH with Baker 7" Whipstock from 5584'to 15,043'. Fill pipe every 30 stands. 05:30 - 06:30 1.00 STWHIP P WEXIT Obtain slow pump rates. Establish rates and obtain MWD signals: 242 GPM, 2250 psi. Orient the Whipstock to 35 degrees right of high side. RIH and tag EZSV at 15,141'. Set down 20K to set anchor. Pick up fOK and ensure anchor is set. Set down 40K to shear mills from the Whipstock. To of W hi stock: 15,124'. 06:30 - 10:00 3.50 STMILL P WEXIT Mill window from 15,124'. ~ j ~ 300 GPM, 2775 psi, 70-90 RPM, 13K-15K TO, 1 K-6K WOB, • ~1 105K ROT WT. Birds nest after 5', work pipe and continue milling. Top of window: 15,124' Bottom of window: 15,137' 10:00 - 14:30 4.50 STMILL P WEXIT Continue to mill new formation to 15,155' (an additional 25' from mid window). 13K TO, 100 RPM, 20K WOB, 308 GPM, 2850 psi. Pumped a 25 bbl Super Sweep pill at 15,139'. Work mills through window several times with out pumps or rotation: No overpull. PU 205K, SO 137K, ROT 145K. 14:30 - 16:30 2.00 STMILL P WEXIT Pump a 30 bbl Super Sweep at 300 GPM, 2730 psi with rotation and reciprocation. 100 RPM, 9.5K TO, pumped 570 bbls. Total metal recovered: 165 lbs. Monitor the well: Static. Obtain slow pump rates at 15,155' MD, 9029' TVD. 16:30 - 17:30 1.00 STMILL P WEXIT RU test lines and perform an FIT to 12.0 ppg EMW; good test. Rig down and blow down test lines. 17:30 - 22:30 5.00 STMILL P WEXIT Pump a dry job. Blow down the top drive and remove the blower hose. POOH racking back 4" drill pipe from 15,156' to 736'. 22:30 - 00:00 1.50 STMILL P WEXIT Monitor the wellbore: Static. rnncea: aiencwo i:~o:ci rm TREE= 4-1/16" CM/ WELLH D = FMC ACTUATOR = ~ BAKER C KB. ELEV = 39.2 BF. ELEV - 26.62 KOP = 1000' Max Angle = 95° @ 16618' Datum MD = 14850' Datum TV D = 8800' SS i a_ 9-5/8" CSG, 40#, L-80, ID = 8.835" Minimum ID = 3.725" @ 14781' 4-1 /2" OTIS XN NIPPLE 7" CSG, 26#, L-80, .0383 bpf, ID = 6.276" I~ 14679' 4-1/2" TBG, 12.6", 13CR, .0152 bpf, ID = 3.958" I-i 14793' PERFORATION SUMMARY REF LOG: MWD ANGLE AT TOP PERF: 90° @ 20050' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE PJ2906 6 20050-20540 Opn 03/19/08 P 2 -45 B Y NOTES: *** 4-1/2" 13 CHROMETBG 8 LINER 2132' J-j4-1/2" BALD SVLN, ID PKG BORE 3.813" GAS LIFT MANDRELS iT MD TVD DEV TYPE VLV LATCH PORT DATE 7 5142 3993 62 KBG2-1 R DMY BK 0 03/25/08 6 8129 5501 62 KBG2-1R DOME BK 16 03/25/08 5 10245 6508 64 KBG2-1R DMY BK 0 03/20/08 4 11329 6985 64 KBG2-1 R SO BK 22 03/25/08 3 12370 7480 61 KBG2-1 R DMY BK 0 03/20/08 2 13370 7980 57 KBG2-1 R DMY BK 0 03/20/08 1 14241 8471 55 KBG2-1R DMY BK 0 03/20/08 146$7' - 14-1/2" X NIP, ID = 3.813" I 14717' 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 14751 ~ 4-1 /2" X NIP, ID = 3.813" 147$1' 4-1/2" XN NIP, ID = 3.725" 14791' 7" X 5" C2 ZXP LT PKR, ID = 5.25" 14794' 4-112" WLEG, ID = 3.958" ELMD LOGGED? 14$09' 7" X 5" BAKER FLIX LOCK LNR HGR W/IXT SLEEVE, ID = 4.43" \ MILLOUT WINDOW (P2-456) 15124' - 15155' PBTD --C 4 1/2" LNR, 12.6#, 13CR, NSCT, ID = 3.958" DATE REV BY COMMENTS DATE REV BY COMMENTS 07/11/97 D-14 COMPLETIONSUSPENDED 09/24/97 D-14 SIDETRACK (P2-45A) 03/22/08 N7ES SIDETRACK (P2-45B) 03/25/08 KDC/SV GLV C/O POINT MCINTYRE UNff WELL: P2-45B PERMIT No: 2080210 API No: 50-029-22769-02 SEC 14, T12N, R14E, 398' FNL & 1296' FWL BP Exploration (Alaska) • • t `"1 ,,, ~ ~ ` ~ 3 ~ jjj i I f i~ ~, t , a.~ C011T5ER RATIO O~SSjp~~1T Greg Hobbs Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Field, Pt. McIntyre Oil Pool, P2-45A Sundry Number: 308-024 Dear Mr. Hobbs: 111 ~`~Y Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, DATED this ~ day of January, 2008 SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 ~e=~ .IAN ,~ ~ 200 Cathy P. Foerster Chairman Encl. • STATE OF ALASKA ~'t /~ ALASKA OIL AND GAS CONSERVATION COM~ION APPLICATION FOR SUNDRY APPROVA~J-~~~N 1 ~ 29 20 AAC 25.280 1. Type of Request: ®Abandon ^ Suspend ^ Operation Shutdown ^ Perfor ~ ~ ' p~~ ~~~pq ~~nn~~ hhnn tt~~ ^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Ent~'r5t~~tled Well ^ Change Approved Program Pull T bing ^ Perforate New Pool ^ Waiver ^ Other 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. ®Development ^ Exploratory 197-144 r 3. Address: ^ Service ^ Stratigraphic 6. API Number: ~ P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22769-01-00 7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number: property line where ownership or landownership changes: P2-45A _ Spacing Exception Required? ^ Yes ®No 9. Property Designation: 10. KB Elevation (ft): 11. Field / Poot(s): ADL 034627 ' 46.2' - Prudhoe Say Field !Point McIntyre Poo{ 12• PRESENT WELL CONDITION SUM MARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 15417' 9187' 15320' 9130' None None in nth Siz MD TVD Burst Colf se Str aural Con r 7 ' 110' 10' S rface 6958' -5/ " 69 2' 4 7' 5750 3 90 Intermedi t Pr u ion 1 7' 7" 1 1 1' 7 4 41 Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 15093' - 15225' 8992' - 9073' 4-1/2", 12.6# 13Cr80 14937' Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV MD (ft): 14891' 13. Attachments: 14. Well Class after proposed work: ® Description Summary of Proposal ^ BOP Sketch ^ Exploratory ®Development ^ Service ^ Detailed Operations Program 15. Estimated Date for 16. Well Status after proposed work: Commencin O erations: January 25, 2008 ^ Oil ^ Gas ^ Plugged ®Abandoned 17. Verbal Approval: Date: ^ WAG ^ GINJ ^ WINJ ^ WDSPL Commission Representative: 18. 1 hereby certify that the fore ing i ,' rue and correct to the best of my knowledge. Contact Phil Smith, 564-4897 Printed Name Greg Ho s Title Engineering Team Leader Prepared By Name/Number: Signature Phone 564-4191 Date J ~ ~ Terrie Hubble, 564-4628 Commission Use Onl Sundry Number Conditions of approval: Notify Commission so that a representative may witness ^ Plug Integrity BOP Test ^ Mechanical Integrity Test ^ Location Clearance Other: ~~~ ~ ~ ~ ~ ~~~ Q ~~: ~~A~ ~ ~ 7.00 Subsequent Form Required: ~('~ APPROVED BY ~~ ZZ A roved B COMMISSIONER THE COMMISSION Date Form 10-403 Revised Of/2006 _ Submit In Duplicate -~~~~ oRi~~Na L To: Tom Maunder - AOGCC Date: January 16, 2007 From: Phil Smith - BPXA GPB Rotary Drilling Subject: P2-45A Application for Sundry Approval - P&A for Sidetrack Operations Reference: API # 50-029-22769-01 Approval is requested for the proposed P&A of PBU well P2-45A. Following the P&A the well will be sidetracked to access unswept oil in the Kuparuk formation in the southeast corner of the Pt. McIntyre y field. A spacing exception has been applied for to the State of Alaska to drill within 500' of the Pt. McIntyre PA boundary The P2-45B sidetrack is scheduled for Nabors 7ES around March 1, 2008. The pre-rig work for this sidetrack is planned to begin as soon as the attached Application for Sundry is approved. Current Condition and histor / Slickline tag TD @ 15256' 6/18/07 / Caliper tubing 7/6/07 / Used "Clare 501"sealant to get swab to hold pressure. Milled scale @ 11,156' 4/25/07 / Fill cleanout and bead blast scale 14,839 - 14,889' (GLM 8) acidize perfs 8/21/07 / MIT-IA 2500 psi Passed 9/6/07 / SBHPS = 4260 psi / 171 ° F @ 8800' ss. Tag TD @ 15250' 10/17/07 Sco e Pre-Rig Work: 1. RU E-line and set a drillable bridge plug in the XN nipple below the packer. 2. RU E-fine. Chemical cut the tubing at 14,886', in the center of the first 10' above the packer. 3. Circulate the tubing and IA to 9.6 ppg brine with 2000' TVD of diesel. 4. Perform CMITIAxT to 3500 psi. Test OA to 2000 psi. 5. Bleed casing and annulus pressures to zero. 6. Cycle the tubing hanger LDS and test the 7" packoff (mandrel hanger) to 5000 psi. 7. Set a BPV and test to 1000 psi from tubing annulus. Remove well house and flow lines. Secure the well. Level the pad as necessary. Ria Operations: 1. MI / RU Nabors 7ES 2. Circulate out diesel freeze protection and displace the well to 9.6 ppg brine. Set BPV/TWC. 3. Nipple down tree. Nipple up and test BOPE to 3,500psi. Pull BPV/TWC. 4. R/U. Pull 4 ~/2" tubing from the cut depth at -14,886' MD and above. 5. RIH with 7" burn shoe and mill packer slips. 6. Push packer to 15,150' MD. CBU, POH. 7. RIH w/ 6.125 string mill and drift 7" casing to 15,150' (29# liner). 8. RIH with 7" cement retainer and set at 15,122'. Abandon perfs with 10 bbls cement (2X casing volume below retainer. CBU, Pressure test casing and retainer to 3500 psi. POH. P2-45A Application for Sundry • • ~ h~~s~~~ 9. P/U and RIH with 7" Baker bottom-trip anchor whipstock assembly. Orient whipstock, as desired, and set on bridge plug. Shear off of whip stock. 10. Displace the well to 9.6 ppg FloPro. Completely displace the well prior to beginning milling operations. 11. Mill window in 7" casing at ± 15,110' MD, plus approximately 20' beyonq middle of window. Circulate well bore clean. 12. Pull up into 7" casing and conduct a formation integrity test. POOH. 13. M/U 6 1/8" BHA with GR/Res/MWD. RIH, kick off and drill the build section. . 14. Drill ahead to horizontal landing point. POOH for bit !BHA change. 'RtL~ ~~ 15. RIH, drill horizontal section to planned TD, short trip as necessary. `/ 16. Circulate, short trip, spot liner running pill, POOH. 17. Run and cement a 41/2", 12.6#, 13-Cr production liner. POOH VD all drill pipe. 18. RU SLB and RIH w/ 1000' 2-1/2" 2906 Powerjet guns set @ 6 SPF. Tag PBTD. 19. Put guns on depth and fire. POOH and verify all shots fired. 20. R/U and run 4 1/2", 12.6#, 13Cr-80 completion tubing. Land the tubing RILDS. 21. Set a TWC and test to 1000 psi 22. Nipple down the BOPE. Nipple up the tree and test to 5,OOOpsi. 23. Reverse circulate inhibited seawater followed by 80 bbls of diesel. U-tube diesel to the tubing side to freeze protect the well to ±200' MD. Drop packer setting ball with rod. 24. Set packer and individually test the tubing and annulus to 3,500psi 30 minutes. Record each test. 25. Secure the well. Rig down and move off. Post-Rig Work: 1. Install well house and instrumentation 2. MI / RU slick-line. Pull the ball and rod / RHC plug from landing nipple below the production packer. Install gas lift valves. 3. Perform SBHPS. Estimated Pre-rig Start Date: 01/20/2008 Estimated Spud Date: 03/01/2008 Phil Smith Operations Drilling Engineer 564-4897 office 240-8072 cell P2-45A Application for Sundry TREE= 4-1/16" CM/ WELLHEAD = FMC ACTUATOR = BAKER C KB. ELEV = 46.2' BF. ELEV - KOP = 1000' Max Angle = 65 @ 10740' _..___ Datum MD = 14844' Datum TVD = 8800' SS 9-5/8" CSG, 40#, L-80, ID = 8.835" Minimum ID = 3.725" @ 14925' 4-1 /2" OTIS XN NIPPLE 7" CSG, 26#, L-80, .0383 bpf, ID = 6.276" I-I 14679 P2-45A ~ C'~iMECSG(14679'~/15505')k+~ROMETBG&7" 2200' -~ 4-1/2" CAMCO BAL-O SVLN, ID = 3.813" GAS LIFT MANDRELS 3T MD TVD DEV TYPE VLV LATCH PORT DATE 1 5175 4005 62 KBG-2-LS DMY INT 0 08/05/07 2 8149 5501 62 KBG-2-LS DMY iNT 0 09/06197 3 9792 6299 62 KBG-2-LS DMY INT 0 09/06/97 4 11154 6907 62 KBG-2-LS DMY INT 0 08/05/07 5 12217 7409 61 KBG-2-LS DMY INT 0 09/06/97 6 13775 8211 55 KBG-2-LS DMY INT 0 09/06/97 7 14753 8790 52 KBG-2-LS DMY INT 0 09/06/97 8 14864 8858 52 KBG-2-LS DMY INT 0 09106!07 14891' 7" X 4-1/2" BKR S-3 PKR, ID = 3.875" 14914' I-14-1/2" OT1S X NIP, ID = 3.813" 14925 I-I4-1/2" OTIS XN NIP, ID = 3.725" 4-1/2" TBG, 12.6#, 13CR, .0152 bpf, ID = 3.958" I--I 14936' 14937 --~4-112" WLEG, ID = 3.958" I 14931' ELMD TT LOGGED 09/22/97 7" MA RKER JT (19') PERFORATION SUMMARY REF LOG: CNPlGR - SPERRY ON 09/05/97 ANGLEATTOPPERF: 52 @ 15093' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3t8" 6 15093 - 15183 O 09/24197 2-7/8" 6 15100 - 15140 O 09/15/05 3-3/8" 6 15200 - 15225 O 02/20/03 u~ ~ ~~~~~ 7" CSG, 29#, 13CR, .0371 bpf, ID = 6.184" 15406' DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 07/11/97 D-14 COMPLETION SUSPENDED 08/18/07 GJF/PJC GLV GO (08/05/07) WELL: P2-45A 09/24!97 D-14 ORIGINAL COMPLETION 09/06/07 TA/PJC GLV GO (09/06(07) PERMff No: 1971440 10/07/01 CH/KAK CORRECTIONS API No: 50-029-22769-01 02/07/03 DRS/TP CSG DEPTH CORRECTION SEC 14, T12N, R14E, 398' FNL & 1296' FWL 02/20/03 TMWKK ADPERFS 09/23105 GJB/TLH ADPERFS BP Exploration (Alaska) ---,~-. TREE _ WELLHEAD = ACTUATOR = KB. ELEV = 46.2' BF. ELEV KOP = 1000' Max Angle - Datum MD = Datum TV D = 8800' SS 9-5/8" CSG, 40#, L-80, ID = 8.835" 6990' Minimum ID = 3.725" @ 14950' 4-1 /2" OTIS XN NIPPLE 7" CSG, 26#, L-80, .0383 bpf, ID = 6.276" ~~ 14679' B Proposed 4-1/16" CM/ FMC P BAKER C 22UU' ~~4-112"SSSVLN,ID=3.813" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH 7 6 s 4 3 2 1 14893' ~4-1/2" X NIP, ID = 3.813" I 14910 T' X41/Z' E~2S3I~ D=3875' 14930' 4-1/2" X NIP, ID = 3.813" 14950' 4-1/2" XN NIP, ID = 3.725" 148 4'VZ'F~r~/lir~-tc~l~ade' ' 4'VZ' Vii D=39~' 15110 Tg~7'V~t~ Swell packer PERFORATION SUMMARY REF LOG: MWD ANGLE AT TOP PERF: Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 4-1/2" TBG, 12.6#, 13CR, 14964, .0152 bpf, ID = 3.958" 41/2' 126#,13-Q', 3813' D DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNfT 07/11/97 D-14 COMPLETION SUSPENDED WELL: P2-45B 09/24/97 D-14 ORIGINAL COMPLETION PERMfT No: 1971440 11/12/07 PGS Proposed Sidetrack API No: 50-029-22769-02 SEC 14, T12N, R14E, 398' FNL & 1296' FWL BP 6cploration (Alaska) gyrodata Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston, Texas 77043 7 131461-3146 Fax: 713/461-0920 ~~ ' ' /~~R ~ 2008 SURVEY REPORT SP P-Pad #P2-45A Prudhoe Bay, AK AK1107G_562 15 Dec 2007 • Serving the Wnrfdvvide E~iergy lndustrV with Precision St.~r~ey Irisf;~usner~#a±ion ro c~aa Gyrodata Incorporated 1682 W. Sam Houston Pkwy. N. Houston. Texas 77043 7131461-3146 Fax: 713/461-0920 January 25, 2008 State of Alaska - AOGCC Attn: Christine Mahnken 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: P-Pad, Well #P2-45A Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, ~~~tr Rob Shoup North American Regional Manager RS:tf Serving the VVorld~nnde Energy industry with Precision Sur~~ey L~strurnent~~tir?=i A Gyrodata Directional Survey for BP EXPLORATION (ALASKA) INC. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK] 107G 562 Run Date: 15 Dec 2007 Surveyor: Rod Tucker; James Butler Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.400250 deg. N Longitude: 148.522373 deg. W Well Head Location - UTM Coordinates: N 5998185.10 ft. E 681542.00 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Well Head Location • BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-4SA, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK 1107G 562 MEASURED I N C L AZIMUTH DEPTH feet deg. deg. A Gyrodata Directional Survey BORE HOLE BEARING deg. min. DOGLEG SEVERITY deg./ 100 ft. VERTICAL CLOSURE HORIZONTAL DEPTH DIST. AZIMUTH COORDINATES feet feet deg. feet 0.00 0.00 0.00 N 0 0 E 0.00 0.00 0.0 0.0 0.00 N 0.00 E -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 0 - 15250 FT. RATE GYROSCOPIC MULTiSHOT SURVEY RUN INSIDE 4-1/2" TUBING MEASURED DEPTHS ARE REFERENCED TO THE TUBING LOCK DOWN SCREWS AT 29 FEET BELOW THE ORIGINAL R.K.B. OF 46.2 FT. AMSL THE DEPTHS ARE CORRECTED FOR 15.68 FT. STRETCH AND A REZERO OF -24.98 FT. 100.00 0.41 6.28 N 6 17 E 0.41 100.00 0.4 6.3 0.35 N 0.04 E 200.00 0.52 25.56 N 25 34 E 0.19 200.00 1.2 13.8 1.12 N 0.27 E 300.00 0.85 87.07 N 87 4 E 0.76 299.99 2.0 37.7 1.57 N 1.21 E 400.00 2.15 104.04 S 75 58 E 1.36 399.95 3.9 73.0 1.15 N 3.77 E 500.00 3.39 102.01 S 77 59 E 1.24 499.84 8.5 89.4 0.08 N 8.48 E 600.00 4.70 98.SS S 81 27 E 1.34 599.58 15.5 94.2 1.14 S 15.42 E 700.00 6.51 90.26 S 89 4S E 1.97 699.10 25.2 94.0 1.78 S 25.14 E 800.00 7.56 95.71 S 84 17 E 1.25 798.35 37.4 93.8 2.46 S 37.35 E 900.00 8.48 100.27 S 79 44 E 1.12 897.37 51.4 94.9 4.43 S 51.16 E 1000.00 9.99 96.74 S 83 16 E 1.61 996.07 67.4 95.8 6.76 S 67.03 E 1 ] 00.00 11.61 91.75 S 88 15 E 1.87 1094.30 86.1 95.4 8.09 S 85.71 E 1200.00 14.32 99.08 S 80 55 E 3.17 1191.75 108.5 95.5 10.35 S 107.98 E 1225.00 15.1 S 101.19 S 78 49 E 3.94 1215.93 1 14.8 95.7 1 1.47 S 1 14.24 E 1250.00 15.97 102.06 S 77 56 E 3.41 1240.01 121.5 96.1 12.82 S 120.81 E 1275.00 16.38 102.39 S 77 37 E 1.71 ]264.02 128.4 96.4 14.30 S 127.61 E 1300.00 16.76 102.55 S 77 27 E 1.51 1287.98 135.5 96.7 15.84 S 134.58 E 1325.00 17.07 103.00 S 77 0 E 1.35 13 ] 1.90 142.7 97.0 17.45 S 141.67 E 1350.00 17.24 103.25 S 76 45 E 0.73 1335.79 150.1 97.3 19.12 S 148.85 E 1375.00 17.47 103.96 S 76 2 E 1.24 1359.65 157.5 97.6 20.87 S 156.10 E 1400.00 17.68 104.56 S 75 26 E 1.12 ]383.48 165.0 97.9 22.73 S 163.41 E l 425.00 17.92 105.18 S 74 49 E 1.23 ] 407.29 ] 72.6 98.2 24.69 S 170.80 E 2 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK 1 107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DiST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 1450.00 18.22 106.14 S 73 52 E 1.68 1431.05 180.3 98.5 26.79 S 178.27 E 1475.00 18.55 106.55 S 73 27 E 1.42 1454.78 188.1 98.9 29.01 S 185.83 E 1500.00 19.32 107.60 S 72 24 E 3.39 1478.43 196.1 99.2 31.39 S 193.58 E 1525.00 19.92 108.62 S 71 23 E 2.74 1501.97 204.4 99.6 34.00 S 201.56 E 1550.00 20.16 109.05 S 70 57 E 1.16 1525.46 212.9 99.9 36.76 S 209.67 E 1575.00 20.41 109.63 S 70 22 E 1.28 1548.91 221.4 100.3 39.63 S 217.85 E 1600.00 20.60 110.01 S 69 59 E 0.93 1572.33 230.1 100.7 42.60 S 226.09 E 1625.00 20.77 110.60 S 69 24 E 1.06 1595.71 238.8 101.0 45.67 S 234.37 E 1650.00 20.96 110.78 S 69 ] 3 E 0.82 1619.07 247.6 101.4 48.82 S 242.70 E 1675.00 21.18 1 10.85 S 69 9 E 0.86 1642.40 256.4 ] 01.7 52.01 S 251.10 E 1700.00 21.80 110.77 S 69 14 E 2.51 1665.66 265.5 102.0 55.26 S 259.66 E 1725.00 22.09 l 10.75 S 69 15 E 1.13 1688.85 274.7 ] 02.3 58.57 S 268.40 E 1750.00 22.30 110.68 S 69 19 E 0.88 1712.00 284.1 102.6 61.91 S 277.23 E 1775.00 22.48 110.63 S 69 22 E 0.69 1735.12 293.5 102.9 65.27 S 286.14 E 1800.00 22.64 110.65 S 69 21 E 0.65 1758.20 303.0 ] 03.1 68.65 S 295.12 E 1825.00 22.88 110.45 S 69 33 E 1.00 ] 78 ] .26 312.6 103.3 72.05 S 304.17 E 1850.00 23.35 110.08 S 69 55 E 1.97 1804.25 322.3 103.5 75.45 S 313.38 E 1875.00 24.79 108.93 S 71 4 E 6.07 1827.08 332.5 103.7 78.85 S 322.99 E 1900.00 26.69 10$.20 S 71 48 E 7.71 1849.59 343.3 103.9 82,30 S 333.28 E 1925.00 27.46 107.82 S 72 11 E 3.15 1871.85 354.6 104.0 85.82 S 344.10 E 1950.00 28.26 106.73 S 73 16 E 3.81 1893.96 366.3 104.1 89.29 S 355.26 E 1975.00 29.00 105.64 S 74 21 E 3.60 1915.90 378.3 104.2 92.62 S 366.77 E 2000.00 29.40 105.33 S 74 40 E 1.70 1937.72 390.5 104.2 95.88 S 378.52 E 2025.00 29.71 105.32 S 74 41 E 1.26 1959.47 402.8 104.2 99.14 S 390.41 E 2050.00 29.91 105.36 S 74 38 E 0.78 1981.16 415.2 104.3 102.43 S 402.40 E 2075.00 30.15 105.57 S 74 26 E 1.05 2002.81 427.7 104.3 105.76 S 414.45 E 2100.00 30.35 105.59 S 74 25 E 0.81 2024.40 440.3 104.4 109.15 S 426.59 E 3 LJ A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK1107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG .VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet ] 00 ft. 2125.00 30.46 105.53 S 74 28 E 0.45 2045.96 453.0 104.4 112.54 S 438.77 E 2150.00 29.91 104.22 S 75 47 E 3.44 2067.58 465.5 104.4 115.77 S 450.92 E 2175.00 29.89 103.79 S 76 13 E 0.87 2089.25 478.0 104.4 118.78 S 463.01 E 2200.00 29.94 103.51 S 76 29 E 0.59 21 10.92 490.5 104.4 121,73 S 475.13 E 2225.00 30.15 103.47 S 76 32 E 0.86 2132.56 503.0 104.3 124.65 S 487.30 E 2250.00 30.36 103.53 S 76 28 E 0.85 2154.15 515.6 104.3 127.59 S 499.55 E 2275.00 30.56 103.57 S 76 26 E 0.79 2175.70 528.3 104.3 130.56 S 511.87 E 2300.00 30.77 103.55 S 76 27 E 0.85 2197.20 541.0 104.3 133.55 S 524,27 E 2325.00 31.06 103.16 S 76 50 E 1.39 2218.65 553.9 104.3 136.51 S 536.76 E 2350.00 31.58 101.92 S 78 5 E 3.32 2240.01 566.8 104.2 139.33 S 549.45 E 2375.00 31.90 101.63 S 78 22 E 1.42 226].27 580.0 104.2 142.02 S 562.32 E 2400.00 32.15 101.55 S 78 27 E 1.03 2282.47 593.2 104.1 144.68 S 575.31 E 2425.00 32.37 101.61 S 78 24 E 0.87 2303.61 606.6 104.1 147.36 S 588.38 E 2450.00 32.64 101.90 S 78 6 E 1.25 2324.69 620.0 104.0 150.10 S 601.53 E 2475.00 32.90 102.58 S 77 25 E 1.80 2345.72 633.5 104.0 152.97 S 614.75 E 2500.00 33.09 102.86 S 77 8 E 0.97 2366.68 647.1 103.9 155.96 S 628.03 E 2525.00 33.31 103.09 S 76 54 E 1.04 2387.60 660.8 103.9 159.04 S 641.37 E 2550.00 33.48 103.42 S 76 35 E 0.98 2408.48 674.6 103.9 162.19 S 654.77 E 2575.00 33.62 103.63 S 76 22 E 0.73 2429.31 688.4 103.9 165.43 S 668.20 E 2600.00 33.76 103.96 S 76 2 E 0.93 2450.11 702.2 103.9 168.73 S 681.67 E 2625.00 33.63 104.64 S 75 22 E 1.59 2470.91 716.1 103.9 172.16 S 695.11 E 2650.00 33.44 105.44 S 74 34 E 1.91 2491.75 729.9 103.9 175.74 S 708.44 E 2675.00 33.58 106.25 S 73 45 E 1.86 2512.59 743.7 104.0 179.51 S 721.72 E 2700.00 33.98 107.33 S 72 40 E 2.90 2533.37 757.6 104.0 183.53 S 735.03 E 2725.00 34.49 108.79 S 71 12 E 3.87 2554.04 771.6 104.1 187.89 S 748.40 E 2750.00 34.97 109.57 S 70 26 E 2.62 2574.59 785.8. 104.2 192.57 S 761.85 E 4 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK1107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 2775.00 35.48 110.02 S 69 59 E 2.29 2595.01 800.2 104.3 197.45 S 775.42 E 2800.00 36.21 110.06 S 69 56 E 2.91 2615.27 814.7 104.4 202.47 S 789.18 E 2825.00 37.37 109.79 S 70 12 E 4.69 2635.29 829.6 104.5 207.57 S 803.25 E 2850.00 38.27 109.52 S 70 29 E 3.b5 2655.04 844.9 104.6 212.73 S 817.69 E 2875.00 38.72 109.43 S 70 34 E 1.82 2674.61 860.4 104.7 217.92 S 832.36 E 2900.00 39.21 109.31 S 70 41 E 1.99 2694.05 876.1 104.8 223.13 S 847.19 E 2925.00 39.78 109.18 S 70 49 E 2.29 2713.34 891:9 104.8 228.37 S 862.20 E 2950.00 40.16 109.12 S 70 53 E 1.51 2732.50 907.9 104.9 233.64 S 877.37 E 2975.00 40.67 108.98 S 71 1 E 2.07 2751.53 924.1 105.0 238.93 S 892.69 E 3000.00 41.08 108.86 S 71 8 E 1.70 2770.44 940.4 105.1 244,23 S 908.17 E 3025.00 41.41 108.75 S 71 15 E 1.32 2789.23 956,9 105.1 249.55 S 923.77 E 3050.00 41.59 108.76 S 71 15 E 0.75 2807.96 973.4 105.2 254.87 S 939.46 E 3075.00 41.75 108.80 S 71 12 E 0.64 2826.63 990.0 105.2 260.22 S 955.19 E 3100.00 41.74 108.85 S 7 ] 9 E 0.14 2845.29 1006.6 105.3 265.59 S 970.95 E 3125.00 41.84 108.91 S 71 6 E 0.44 2863.93 1023.2 105,4 270.98 S 986.71 E 3150.00 42.11 108.96 S 71 2 E 1.10 2882.51 1039.9 105.4 276.41 S 1002.53 E 3175.00 42.78 109.06 S 70 57 E 2.69 2900.96 1056.8 105.5 281.91 S 1018.48 E 3200.00 43.41 109.10 S 70 54 E 2.49 2919.21 1073.8 105.5 287.49 S 1034.62 E 3225.00 44.03 109.14 S 70 52 E 2.51 2937.28 1091.1 105.6 293.15 S 1050.95 E 3250.00 44.58 109.17 S 70 50 E 2.17 2955.17 1108.5 105.6 298.88 S 1067.44 E 3275.00 44.99 109.18 S 70 49 E 1.67 2972.92 1126.1 105.7 304.66 S 1084.08 E 3300.00 45.52 109.34 S 70 39 E 2.14 2990.51 1143.8 105.8 310.52 S 1100.84 E 3325.00 45.80 109.49 S 70 30 E 1.20 3007.99 1161.6 105.8 316.46 S 1117.70 E 3350.00 46.10 110.01 S 69 59 E 1.92 3025.37 ' 1179.6 105.9 322.54 S 1134.61 E 3375.00 46.22 110.68 S 69 19 E 2.01 3042.69 1197.5 105.9 328.81 S 1151.52 E 3400.00 46.50 111.14 S 68 52 E 1.71 3059.94 1215.6 106.0 335.26 S 1168.42 E 3425.00 46.97 111.81 S 68 11 E 2.71 3077.07 1233.7 106.1 341.93 S 1185.36 E 5 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AKl 107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH D1ST. AZIMUTH COORDINATES feet deg. deg. deg, min. deg./ feet feet deg. feet 100 ft. . 3450.00 47.58 112.57 S 67 26 E 3.30 3094.04 1252.0 106.2 348.87 5 1202.36 E 3475.00 48.35 113.64 S 66 21 E 4.44 3110.78 1270.4 106.3 356.15 S 1219.44 E 3500.00 49.06 114.39 S 65 37 E 3.62 3127.28 1289.0 106.4 363.80 S 1236.60 E 3525.00 49.73 115.07 S 64 56 E 3.40 3143.55 1307.8 106.5 371.74 S 1253.84 E 3550.00 50.33 1 ]5.59 S 64 25 E 2.87 3159.61 1326.7 106.6 379.93 S 1271.15 E 3575.00 50.77 115.94 S 64 4 E 2.09 3175.49 1345.8 106.8 388.33 S 1288.54 E 3600.00 5 ] .25 116.38 S 63 37 E 2.36 3191.22 1365.0 106.9 396.89 S 1305.98 E 3625.00 51.57 116.61 S 63 23 E 1.44 3206.82 1384.2 107.0 405.61 5 1323,47 E 3650.00 51.94 116.69 S 63 18 E 1.52 3222.29 1403.6 107.2 414.42 S 1341.02 E 3675.00 52.24 116.75 S 63 15 E 1.22 3237.65 1423.0 107.3 423.29 S 1358.63 E 3700.00 52.61 116.77 S 63 l4 E 1.47 3252,89 1442.6 107.4 432.21 S 1376.33 E 3725.00 52.95 116.76 S 63 14 E 1.37 3268.02 1462.2 107.6 441.17 S 1394.10 E 3750.00 53.23 116.76 S 63 15 E 1.09 3283.03 1482.0 107.7 450.17 S 1411.95 E 3775.00 53.55 116.72 S 63 17 E 1.31 3297.94 1501.8 107.8 459.20 S 1429.87 E 3800.00 53.71 116.48 S 63 31 E ].00 3312.76 1521.7 107.9 468.22 S 1447.87 E 3825.00 53.91 116.01 5 63 59 E 1.71 3327.53 154].7 108.0 477.14 S 1465.97 E 3850.00 54.11 115.31 S 64 42 E 2.42 3342.22 1561.7 108.1 485.90 S 1484.20 E 3875.00 54.34 114.53 S 65 28 E 2.68 3356.83 1581.9 108.2 494.44 S 1502.60 E 3900.00 54.71 114.20 S 65 48 E 1.84 3371.34 1602.1 108.3 502.84 S 1521.14 E 3925.04 55.18 113.85 S 66 9 E 2.20 3385.70 1622.5 108.4 511.17 S 1539.84 E 3950.00 55.62 113.69 S 66 19 E 1.86 3399.89 1643.0 108.4 519.47 S 1558.67 E 3975.00 55.95 113.62 S 66 23 E 1.34 3413.95 1663.5 108.5 527.76 S 1577.61 E 4000,00 55.89 113.73 S 66 I6 E 0.45 3427.96 1684.2 108.6 536.08 S 1596.57 E 4025.00 55.99 ] 13.80 S 66 12 E 0.47 3441.96 1704.8 108.6 544.42 S 1615.53 E 4050.00 56.14 113.92 S 66 5 E 0.70 3455.91 1725.5 108.7 552.81 S 1634.50 E 4075.00 56.1 ] 113.90 S 66 6 E 0.13 3469.85 1746.1 108.7 561.23 S 1653,47 E 4100.00 55.80 113.68 S b6 19 E 1.45 3483.85 1766.8 108.8 569.58 S 1672.43 E 6 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK1107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH D1ST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 4125.00 55.47 113.17 S 66 50 E 2.13 3497.96 1787.3 108.9 577.79 S 1691.36 E 4150.00 55.57 112.91 S 67 6 E 0.95 3512.11 1807.9 108.9 585.85 S 1710.33 E 4175.00 55.84 112.91 S 67 5 E 1.10 3526.20 1828.5 109.0 593,89 S 1729.35 E 4200.00 56.43 112.90 S 67 6 E 2.35 3540.13 1849.2 109.0 601.97 S 1748.47 E 4225.00 57.63 112.84 S 67 10 E 4.80 3553,73 1870.1 109.0 610.12 S 1767,80 E 4250.00 58.90 112.67 S 67 20 E 5.11 3566.88 1891.3 109.1 618.35 S 1787.40 E 4275.00 59.96 112.53 S 67 28 E 4.27 3579.60 1912.8 109.1 626.62 S 1807.27 E 4300.00 60.46 112.50 S 67 30 E 2.03 3592.02 1934.5 109.2 634.93 S 1827.32 E 4325.00 60.80 112.45 S 67 33 E 1.36 3604.28 1956.2 109.2 643.26 S 1847.45 E 4350.00 60.98 112.41 S 67 35 E 0.71 3616.44 1978.0 109.2 651.59 S 1867.64 E 4375.00 60.94 112.28 S 67 43 E 0.47 3628.58 1999.9 109.3 659.90 S 1887.85 E 4400.00 60.99 112.23 S 67 46 E 0.25 3640.71 2021.7 109.3 668.18 S 1908.08 E 4425.00 60.78 112.07 S 67 56 E 1.00 3652.88 2043.5 109.3 676.41 S 1928.31 E 4450.00 60.69 1 ] 1.96 S 68 3 E 0.54 3665.10 2065.3 109.4 684.59 S 1948.53 E 4475.00 60.57 111.86 S 68 8 E 0.60 3677.36 2087.1 109.4 692.72 S 1968.75 E 4500.00 60.46 111.81 S 68 11 E 0.47 3689.66 2108.8 109.4 700.81 S 1988.95 E 4525.00 60.28 111.74 S 68 16 E 0.77 3702.02 2130.5 109.4 708.87 S 2009.13 E 4550.00 59.87 111.70 S 68 18 E 1.64 3714.50 2152.2 109.5 716.89 S 2029.25 E 4575.00 59.88 111.94 S 68 3 E 0.85 3727.04 2173.8 109.5 724.93 S 2049.33 E 4600.00 59.85 1 ] 2.28 S 67 43 E 1.16 3739.59 2195.4 ] 09.5 733.06 S 2069.36 E 4625.00 59.97 112.51 S 67 30 E 0.92 3752.13 2217.0 109.5 741.3..1 S 2089.36 E 4650.00 60.29 112.62 S 67 23 E ].34 3764.58 2238.6 109.6 749.62 S 2109.38 E 4675.00 60.77 112.83 S 67 10 E 2.06 3776.88 2260.4 109.6 758.03 S 2129.45 E 4700.00 61.37 112.95 S 67 3 E 2.43 3788.97 2282.2 109.6 766.54 S 2149.61 E 4725.00 61.89 113.00 S 67 0 E 2.09 3800.85 2304.2 109.7 775.13 S 2169.86 E 4750.00 61.74 113.26 S 66 45 E 1.09 3812.66 2326.2 109.7 783.79 S 2190.13 E 7 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK 1107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 4775.00 61.22 113.57 S 66 26 E 2.34 3824.59 2348.1 109.7 792.52 S 2210.29 E 4800.00 60.40 114.03 S 6S 58 E 3.67 3836.79 2369.8 109.8 801.32 S 2230.26 E 4825.00 60.37 1 ]4.38 S 65 37 E 1.24 3849.14 2391.5 109.8 810.23 S 2250.08 E 4850.00 60.74 114.60 S 65 24 E 1.66 3861.43 2413.2 109.8 819.26 S 2269.89 E 4875.00 61.61 114.98 S 65 1 E 3.72 3873.49 2435.0 109.9 828.44 S 2289.77 E 4900.00 62.15 ] 15.12 S 64 53 E 2.23 3885.27 2457.0 109.9 837.78 S 2309.75 E 4925.00 62.49 115.25 S 64 45 E 1.45 3896.88 2479.0 110.0 847.20 S 2329.78 E 4950.00 62.78 115.37 S 64 38 E 1.22 3908.37 2501.1 110.0 856.69 S 2349.85 E 4975.00 62.79 115.56 S 64 26 E 0.69 3919.81 2523.3 110.1 866.25 S 2369.93 E 5000.00 62.65 115.68 S 64 19 E 0.69 3931.27 2545.4 110.1 875.86 S 2389.96 E 5025.00 62.77 115.67 S 64 20 E 0.49 3942.73 2567.5 110.2 885.48 S 2409.98 E 5050.00 62.74 115.6] S 64 23 E 0.23 3954.18 2589.6 110.2 895.10 S 2430.02 E 5075.00 b2.74 115.68 S 64 19 E 0.26 3965.63 2611.8 110.3 904.72 S 2450.05 E 5100.00 62.63 115.70 S 64 ] 8 E 0.47 3977.10 2633.9 1 10.3 914.35 S 2470.07 E 5125.00 62.49 115.53 S 64 28 E 0.81 3988.62 2656.0 110.4 923.94 S 2490.08 E 5150.00 61.77 115.36 S 64 39 E 2.94 4000.31 2678.0 110.4 933.43 S 2510,03 E 5175.00 60.85 115.00 S 65 0 E 3.90 40]2.31 2699.8 110.4 942.76 S 2529.88 E 5200.00 60.96 114.92 S 65 5 E 0.54 4024.47 2721.6 110.5 951.98 S 2549.68 E 5225.00 61.17 114.93 S 65 4 E 0.85 4036.56 2743.4 110,5 961.20 S 2569.53 E 5250.00 61.16 115.04 S 64 58 E 0.39 4048.62 2765.3 110.5 970.45 S 2589.38 E 5275.00 61.20 114.96 S 65 3 E 0.32 4060.67 2787.1 110.6 979.71 S 2609.23 E 5300.00 61.20 114.85 S 65 9 E 0.37 4072.71 2808.9 110.6 988.93 S 2629.10 E 5325.00 60.86 114.61 S 65 23 E 1.60 4084.82 2830.8 110.6 998.08 S 2648.97 E 5350.00 60.48 114.39 S 65 37 E 1.69 4097.07 2852.5 110.7 1007.12 S 2668.80 E 5375.00 60.23 114.36 S 65 38 E 1.00 4]09.43 2874.2 110.7 1016.09 S 2688.59 E 5400.00 60.00 114.50 S 65 30 E 1.05 4121.89 2895.8 110.7 1025.06 S 2708.33 E 5425.00 59.98 114.49 S 65 31 E 0.09 4134.39 2917.4 110.8 1034.03 S 2728.03 E 8 ~~ A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK1107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 5450.00 59.84 114.52 S 65 29 E 0.58 4146.93 2939.0 110.8 1043.00 S 2747.71 E 5475.00 59.71 114.43 S 65 34 E 0.60 4159.51 2960.6 110.8 1051.95 S 2767.37 E 5500.00 59.54 114.33 S 65 40 E 0.76 4172.15 2982.1 110.8 1060.86 S 2787.01 E 5525.00 59.46 114.39 S 65 36 E 0.39 4184.84 3003.6 110.9 1069.74 S 2806.64 E 5550.00 59.42 114.40 S 65 36 E 0.18 4197.55 3025.1 110.9 1078.63 S 2826.24 E 5575.00 59.42 114.34 S 65 40 E 0.22 4210.27 3046.6 110.9 1087.52 S 2845.85 E 5600.00 59.37 114.36 S 65 38 E 0.24 4223.00 3068.0 110.9 1096.39 S 2865.45 E 5625.00 59.34 114.34 S 65 40 E 0.12 4235.74 3089.5 111.0 1105.25 S 2885.04 E 5650.00 59.17 114.11 S 65 54 E 1.05 4248.52 3111.0 111.0 1114.07 S 2904.64 E 5675.00 59.09 114.02 S 65 59 E 0.44 4261.35 3132.4 111.0 1122,82 S 2924.23 E 5700.00 58.50 114.32 S 65 41 E 2.55 4274.30 3153.7 111.0 1131.58 S 2943.74 E 5725.00 58.06 114.29 S 65 43 E 1.79 4287.44 3175.0 111.0 1140.33 S 2963.12 E 5750.00 57.82 114.12 S 65 53 E ].12 4300.71 3196.1 111.1 1149.01 S 2982.45 E 5775.00 57.28 114.20 S 65 48 E 2.16 4314.13 3217.2 111.1 1157.65 S 3001.70 E 5800.00 57.14 114.41 S 65 35 E 0.89 4327.67 3238.2 111.1 1166.30 S 3020.85 E 5825.00 57.10 114.34 S 65 39 E 0.30 4341.24 3259.1 111.1 1174.97 S 3039.97 E 5850.00 56.76 114.12 S 65 53 E 1.56 4354.88 3280.1 111.2 1183.57 S 3059.08 E 5875.00 56.24 ] 13.82 S 66 1 l E 2.29 4368.68 3300.9 1 1 1.2 1 192.04 S 3078.13 E 5900.00 56.54 113.66 S 66 20 E 1.32 4382.52 3321.7 111.2 1200.42 S 3097.19 E 5925.00 56.97 113.53 S 66 28 E 1.77 4396.22 3342.6 111.2 1208,79 S 3116.35 E 5950.00 57.40 113.48 S 66 31 E 1.73 4409.77 3363.6 1 1 1.2 1217,17 S 3135.61 E 5975.00 57.61 113.33 S 66 40 E 0.99 4423.20 3384.6 111.2 1225.55 S 3154.96 E 6000.00 57.31 113.14 S 66 52 E 1.37 4436.64 3405.7 111.2 1233.86 S 3174.33 E 6025.00 57.11 113.01 S 66 59 E 0.91 4450.18 3426.7 111.3 1242.10 S 3193.67 E 6050.00 57.21 113.10 S 66 54 E 0.49 4463.74 3447.7 l 11.3 1250.32 S 3212.99 E 6075.00 56.81 113.28 S 66 43 E ].71 4477.36 3468.7 111.3 1258.58 S 3232.27 E 6 ] 00.00 56.38 113.17 S 66 50 E 1.74 4491.12 3489.5 1 1 1.3 1266.81 S 3251.45 E 9 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska lob Number: AK1107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 6125.00 56.16 113.00 S 67 0 E 1.05 4505.00 3510.3 111.3 1274.96 S 3270.57 E 6150.00 56.04 112.92 S 67 5 E 0.55 4518.94 3531.0 111.3 1283.06 S 3289.68 E 6175.00 55.95 113.19 S 66 49 E 0.96 4532.92 3551.8 111.3 1291.17 S 3308.75 E 6200.00 55.67 113.84 S 66 10 E 2.44 4546.97 3572.4 111.3 1299.42 S 3327.71 E 6225.00 55.64 114.29 S 65 43 E 1.50 4561.08 3593.0 111.3 1307.84 S 3346.56 E 6250.00 55.74 114.57 S 65 26 E 1.01 4575.17 3613.7 111.4 1316.38 S 3365.36 E 6275.00 56.17 114.95 S 65 3 E 2.13 4589.16 3634.3 111.4 1325.05 S 3384.17 E 6300.00 56.78 115.28 S 64 43 E 2.67 4602.97 3655.1 111.4 1333.90 S 3403.04 E 6325.00 57.30 115.70 S 64 18 E 2.50 4616.57 3676.1 111.4 1342.93 S 3421.98 E 6350.00 57.48 115.86 S 64 8 E 0.89 4630.05 3697.1 111.5 1352.09 S 3440.94 E 6375.00 57.62 115.93 S 64 4 E 0.61 4643.46 3718.1 1 1 1.5 ] 361.30 S 3459.92 E 6400.00 57.53 115.91 S 64 5 E 0.35 4656.87 3739.1 111.5 1370.53 S 3478.90 E 6425.00 57.34 115.91 S 64 5 E 0.77 4670.32 3760.1 111.5 1379.73 S 3497.85 E 6450.00 57.44 115.81 S 64 11 E 0.53 4683.80 3781.1 111.6 1388.92 S 3516.80 E 6475.00 56.85 115.43 S 64 34 E 2.68 4697.36 3802.1 111.6 1398.00 S 3535.73 E 6500.00 56.51 115.15 S 64 51 E 1.67 4711.09 3822.9 111.6 1406.92 S 3554.62 E 6525.00 56.74 115.01 S 64 59 E 1.02 4724,85 3843.8 111.6 1415.77 S 3573.53 E 6550.00 57.35 115.07 S 64 56 E 2.43 4738.45 3864.7 111.6 1424.65 S 3592.53 E 6575.00 58.10 115.15 S 64 51 E 3.02 4751.80 3885.8 111.7 1433.62 S 3611.67 E 6600.00 58.65 115.16 S 64 51 E 2.19 4764.91 3907.0 ' 111.7 1442.67 S 3630.94 E 6625.00 58.97 ] 15.26 S 64 44 E 1.34 4777.86 3928.4 1 1 1.7 1451.78 S 3650.29 E 6650.00 59.32 115.27 S 64 44 E 1.41 4790.68 3949.8 111.7 1460.94 S 3669.70 E 6675.00 59.61 1 15.34 S 64 40 E l .l 6 4803.38 3971.3 1 1 1.7 1470,14 S 3689.16 E 6700.00 59.55 1 15.39 S 64 37 E 0.28 4$16.04 3992.8 1 1 1.7 1479.38 S 3708.64 E 6725.00 59.12 115.16 S 64 51 E 1.90 4828.79 4014.3 111.8 1488.56 S 3728.09 E 6750.00 59.11 115.04 S 64 58 E 0.41 4841.62 4035.7 111.8 1497.66 S 3747.52 E 10 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad W ell: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK1107G 562 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DiST. AZIMUTH CO ORDINATES feet deg. deg, deg. min. deg./ feet feet deg, feet 100 ft. 6775.00 58.92 114.75 S 65 15 E 1.24 4854.49 4057.1 111.8 1506.68 S 3766.96 E 6800.00 58.4] 114.55 S 65 27 E 2.13 4867.50 4078.4 111.8 1515.59 S 3786.37 E 6825.00 58.29 114.72 S 65 17 E 0.74 4880.62 4099.7 111.8 1524.46 S 3805.71 E 6850.00 57.99 114.41 S 65 35 E 1.56. 4893.81 4120.9 111.8 .1533.29 S 3825.02 E 6875.00 57.73 114.22 S 65 47 E 1.23 4907.11 4142:0 111.9 1542.00 S 3844.31 E 6900.00 58.15 114.52 S 65 29 E 1.94 4920.38 4163.2 111.9 1550.74 S 3863.61 E 6925.00 58.75 114.70 S 65 18 E 2.48 4933.47 4184.5 111.9 1559.62 S 3882.98 E 6950.00 59.45 115.01 S 64 59 E 3.02 4946.30 4205.9 111.9 1568.63 S 3902.44 E 6975.00 60.39 115.50 S 64 30 E 4.14 4958.83 4227.5 111.9 1577.86 S 3922.01 E 7000.00 61.40 ] ] 5.82 S 64 ] 1 E 4.16 4970.99 4249.3 1 1 1.9 1587.32 S 3941.70 E 7025.00 61.22 114.99 S 65 0 E 2.98 4983.00 4271.2 112.0 1596.73 S 3961.51 E 7050.00 61.31 113.90 S 66 6 E 3.87 4995.02 4293.1 1 12.0 1605.80 S 3981,46 E 7075.00 61.87 1 ]3.7] S 66 17 E 2.32 5006.91 4315.1 112.0 1614.68 S 4001.58 E 7100.00 62.23 113.44 S 66 34 E 1.74 5018.63 4337.1 112.0 1623.51 S 4021.82 E 7125.00 62.79 112.96 S 67 2 E 2.82 5030.17 4359.3 1 12.0 ] 632.25 S 4042.21 E 7150.00 63. ] 3 ] 12.21 S 67 47 E 2.97 5041.53 4381.6 1 12.0 1640.80 S 4062.76 E 7 ] 75.00 62.88 1 12.07 S 67 56 E 1. ] 0 5052.88 4403.9 1 12.0 1649.19 S 4083.40 E 7200.00 62.56 112.07 S 67 56 E 1.30 5064.34 4426.1 112.0 1657.54 S 4103.99 E 7225.00 62.50 1 ]2.15 S 67 51 E 0.36 5075.87 4448.3 112.0 1665.89 S 4124,54 E 7250.00 62.57 112.27 S 67 44 E 0.52 5087.40 4470.4 112.0 1674.27 S 4145.08 E 7275.00 61.50 1 ]2.52 S 67 29 E 4.38 5099.12 4492.5 112.0 1682.69 S 4165.49 E 7300.00 61.04 112.64 S 67 22 E 1.87 5111.14 4514.4 112.0 1691.10 S 4185.73 E 7325.00 61.09 112.58 S 67 25 E 0.28 5123.23 4536.3 ] 12.0 1699.52 S 4205.93 E 7350.00 60.84 112.47 S 67 32 E 1.09 5135.37 4558.2 112.0 1707.89 S 4226.12 E 7375.00 60.62 112.40 S 67 36 E 0.92 5147.59 4580.0 1 12.0 17 ] 6.21 S 4246.28 E 7400.00 60.84 112.38 S 67 37 E 0.89 5159.82 4601.8 112.0 1724.52 S 4266.44 E 7425.00 60.79 112.44 S 67 34 E 0.29 5172.01 4623.6 112.0 1732.84 S 4286.62 E 11 BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK 1 ] 07G 562 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH D1ST. AZIMUTH COORDIN ATES feet deg. deg. deg. min, deg./ feet feet deg. feet 100 ft. 7450.00 60.84 112.62 S 67 23 E 0.66 5184.20 4645.4 112.0 1741.20 S 4306.78 E 7475.00 61.15 112.86 S 67 8 E 1.50 5196.32 4667.3 112.0 1749.65 S 432b.95 E 7500.00 61.52 113.05 S 66 57 E 1.62 5208.31 4689.2 ] 12.0 1758.21 S 4347.14 E 7525.00 61.87 113.20 S 66 48 E 1.51 5220.17 4711.2 112.0 1766.85 S 4367.39 E 7550.00 62.34 113.44 S 66 34 E 2.06 523].86 4733.3 112.0 1775.60 S 4387.68 E 7575.00 62.62 113.55 S 66 27 E 1.16 5243.42 4755.5 112.0 1784.44 S 4408.01 E 7600.00 62.28 113.36 S 66 38 E 1.51 5254.98 4777.7 112.0 1793.26 S 4428.34 E 7625.00 62.15 112.93 S 67 4 E 1.62 5266.64 4799.8 112.1 1801.95 S 4448.68 E 7650.00 61.62 112.26 S 67 44 E 3.15 5278.42 4821.8 112.1 1810.43 S 4469.04 E 7675.00 61.40 112.10 S 67 54 E 1.04 5290.34 4843.8 112.1 1818.72 S 4489.38 E 7700.00 61.51 112.16 S 67 50 E 0.49 5302.29 4865.8 112.1 1827.00 S 4509.73 E 7725.00 61.65 112.40 S 67 36 E 1.01 5314.19 4887.7 112.1 1835.33 S 4530.07 E 7750.00 62.08 112.48 S 67 31 E 1.72 5325.97 4909.8 112.1 1843.75 S 4550.45 E 7775.00 62.24 112.68 S 67 19 E 0.95 5337.65 4931.9 112.1 1852.24 S 4570.86 E 7800.00 62.45 l ] 2.57 S 67 26 E 0.92 5349.26 4954.0 1 12.1 1860.76 S 4591.30 E 7825.00 62.49 112.06 S 67 57 E 1.84 5360.81 4976.2 112.1 1869.17 S 4611.81 E 7850.00 62.54 111.72 S 68 17 E 1.23 5372.35 4998.4 112.1 1877.44 S 4632.39 E 7875.00 63.17 ] ] 1.74 S 68 15 E 2.52 5383.76 5020.6 1 12.1 1885.68 S 4653.05 E 7900.00 63.27 111.64 S 68 21 E 0.55 5395.02 5042.9 112.1 1893.93 S 4673.79 E 7925.00 61.50 111.31 S 68 41 E 7. l 9 5406.6 ] 5065.1 112.1 1902.04 S 4694.40 E 7950.00 60.87 111.08 S 68 55 E 2.64 5418.66 5087.0 112.1 1909.96 S 4714,83 E 7975.00 60.56 111.01 S 68 59 E 1.26 5430.88 5108.8 1 12.0 1917.79 S 4735,18 E 8000.00 60.72 110.98 S 69 1 E 0.64 5443.14 5130.6 ] 12.0 1925.59 S 4755.52 E 8025.00 61.14 110.98 S 69 1 E 1.66 5455.29 5152.4 112.0 1933.42 S 4775.92 E 8050.00 61.57 111.02 S 68 59 E 1.75 5467.27 5174.4 112.0 1941.28 S 4796.40 E 8075.00 61.69 111.07 S 68 56 E 0.50 5479.15 5196.4 112.0 1949.18 S 4816.93 E 8 ] 00.00 61.79 111.1 l S 68 53 E 0.43 5490.99 5218.4 112.0 1957.10 S 4837.48 E • i 12 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number; AKl 107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg;/ feet feet deg. feet 100 ft. 8125.00 62.04 111.16 S 68 50 E 1.03 5502.76 5240.4 112.0 1965.06 S 4858.05 E 8150.00 61.81 111.24 S 68 45 E 0.96 5514.52 5262.5 112.0 1973.03 S 4878.62 E 8175.00 61.92 111.34 S 68 40 E 0.52 5526.31 5284.5 112.0 1981.04 S 4899.16 E 8200.00 62.29 111.66 S 68 20 E 1.89 5538.0] 5306.6 112.0 1989.13 S 4919.72 E 8225.00 62.76 1 1 1.97 S 68 2 E 2. ] 8 5549.54 5328.8 1 12.0 1997.38 S 4940.31 E 8250.00 62.94 112.01 S 67 59 E 0.72 5560.95 5351.1 112.0 2005.71 S 4960.94 E 8275.00 63.16 111.80 S 68 12 E 1.19 5572.28 5373.3 112.0 2014.02 S 4981.61 E 8300.00 62.51 110.50 S 69 30 E 5.30 5583.69 5395.6 112.0 2022.05 S 5002.36 E 8325.00 62.34 109.62 S 70 23 E 3.22 5595.27 5417.7 112.0 2029.65 S 5023.17 E 8350.00 62.67 109.49 S 70 30 E 1.40 5606.81 5439.9 112.0 2037.07 S 5044.07 E 8375.00 62.58 109.14 S 70 52 E 1.32 5618.30 5462.1 112.0 2044.41 S 5065.02 E 8400.00 61.86 108.81 S 71 11 E 3.11 5629.96 5484.1 112.0 2051.60 S 5085.94 E 8425.00 62.14 108.75 S 71 15 E 1.15 5641.69 5506.2 112.0 2058.71 S 5106.83 E 8450.00 62.19 108.79 S 71 ] 3 E 0.26 5653.37 5528.3 1 1 1.9 2065.82 S 5127.77 E 8475.00 62.18 108.80 S 71 12 E 0.09 5665.03 5550.3 111.9 2072.95 S 5148.70 E 8500.00 62.13 108.84 S 71 10 E 0.23 5676.71 5572.4 111.9 2080.08 S 5169.62 E 8525.00 62.48 108.88 S 71 7 E 1.39 5688.33 5594.5 111.9 2087.23 S 5190.57 E 8550.00 62.91 108.96 S 71 2 E 1.74 5699.80 5616.7 111.9 2094.44 S 5211.58 E 8575.00 62.01 109.43 S 70 34 E 3.96 5711.36 5638.8 111.9 2101.73 S 5232.52 E 8600.00 60.64 110.05 S 69 57 E 5.87 5723.36 5660.8 111.9 2109.13 S 5253.16 E 8625.00 60.81 110.91 S 69 6 E 3.06 5735.58 5682.6 111.9 2116.76 S 5273.59 E 8650.00 61.58 111.20 S 68 48 E 3.26 5747.63 5704.5 111.9 2124.63 S 5294.03 E 8675.00 61.89 111.47 S 68 32 E 1.55 5759.46 5726.5 111.9 2132.64 S 5314.54 E 8700.00 61.63 111.56 S 68 26 E 1.11 5771.30 5748.5 111.9 2140.72 S 5335.03 E 8725.00 61.98 11 ].58 S 68 25 E 1.43 5783.1 1 5770.5 1 1 1.9 2148.82 S 5355.52 E 8750,00 61.76 111.49 S 68 30 E 0.95 5794.89 5792.6 111.9 2156.92 S 5376.03 E 13 BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK 1 107G 562 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH CO ORDINATES feet deg. deg, deg. min. deg./ feet feet deg. feet 100 ft. 8775.00 60.40 111.50 S 68 30 E 5.41 5806.98 5814.5 111.9 2164.93 S 5396.39 E 8800.00 59.39 111.41 S 68 35 E 4.05 5819.52 5836.1 111.9 2172.85 S 5416.52 E 8825.00 59.28 111.52 S 68 29 E 0.59. 5832.27 5857.6 111.9 2180,72 S 5436.53 E 8850.00 59.29 111.60 S 68 24 E 0.28 5845.04 5879.1 ] 1 1.9 2188.61 S 5456.52 E 8875.00 59.20 111.56 S 68 27 E 0.40 5857.82 5900.6 111.9 2196.51 S 5476.50 E 8900.00 59.58 111.50 S 68 30 E 1.53 5870.SS 5922.1 111.9 2204.41 S 5496.51 E 8925.00 59.46 111.35 S 68 39 E 0.69 5883.24 5943.6 111.9 2212.28 S 5516.57 E 8950.00 59.59 111.24 S 68 46 E 0.65 5895.91 5965.2 111.8 2220.11 S 5536.65 E 8975.00 59.50 111.05 S 68 57 E 0.77 5908.59 5986.7 111.8 2227.88 S 5556.75 E 9000.00 59.66 111.03 S 68 58 E 0.68 5921.24 6008.3 111.8 2235.62 S 5576.87 E 9025.00 59.91 111.04 S 68 58 E 1.00 5933.82 6029.9 111.8 2243.37 S 5597.03 E 9050.00 59.71 1 ] 0.90 S 69 6 E 0.96 5946.40 6051.5 1 1 1.8 2251.1 1 S 5617.21 E 9075.00 60.05 110.88 S 69 7 E 1.39 5958.94 6073.1 111.8 2258.82 S 5637.41 E 9100.00 59.92 110.89 S 69 7 E 0.53 5971.45 6094.8 111.8 2266.53 S 5657.64 E 9125.00 59.73 110.86 S 69 8 E 0.78 5984.01 6116.4 111.8 2274.24 S 5677.83 E 9150.00 60.10 1 ]0.72 S 69 17 E 1.57 5996.55 6138.0 111.8 2281.91 S 5698.05 E 9175.00 60.14 110.53 S 69 28 E 0.68 6009.00 6159.7 111.8 2289.55 S 5718.34 E 9200.00 60.27 110.45 S 69 33 E 0.57 6021.42 6181.4 111.8 2297.1 S S 5738.66 E 9225.00 60.38 110.47 S 69 32 E 0.48 6033.80 6203.1 111.8 2304.74 S 5759.01 E 9250.00 60.30 110.61 S 69 23 E 0.61 6046.1.7 6224.8 111.8 2312.36 S 5779.36 E 9275.00 60.67 110.84 S 69 ] 0 E 1.70 6058.49 6246.5 1 1 1.8 2320.06 S 5799.71 E 9300.00 60.44 111.31 S 68 41 E 1.90 6070.78 6268.3 111.8 2327.89 S 5820.02 E 9325.00 60.29 111.60 S 68 24 E 1.18 6083.14 6290.0 111.8 2335,84 S 5840.24 E 9350.00 60.54 111.66 S 68 21 E 1.02 6095.48 6311.8 111.8 2343.85 S 5860.45 E 9375.00 60.36 111.68 S 68 19 E 0.72 6107.81 6333.5 111.8 2351.88 S 5880.66 E 9400.00 60.55 111.62 S 68 23 E 0.77 6120.14 6355,3 111.8 2359.90 S 5900.88 E 9425.00 60.69 111.45 S 68 33 E 0.83 6132.41 6377.1 111.8 2367.90 S 5921.14 E LJ 14 A Gyrodata Directional Survey BP Exploration ( Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast T ruck, Prudhoe Bay, Alaska Job Number: AK 1107G 562 MEASURED I N C L AZIMUTH B ORE HOLE DOGLEG VERTICAL CLOS URE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet ] 00 ft. 9450.00 60.48 111.39 S 68 37 E 0.89 6]44.68 6398.8 ] 11.8 2375.86 S 5941.42 E 9475.00 60.68 111.41 S 68 35 E 0.79 6156.96 6420.6 111.8 2383.80 S 5961.69 E 9500.00 60.64 111.26 S 68 45 E 0.55 6169.21 6442.4 111.8 2391.73 S 5981.99 E 9525.00 6 ] .08 11 1.13 S 68 52 E 1.79 6181.39 6464.2 1 1 1.8 2399.62 S 6002.35 E 9550.00 61.33 110.96 S 69 2 E 1.15 6]93.43 6486.1 111.8 2407.49 S 6022.80 E 9575.00 61.36 110.86 S 69 8 E 0.36 6205.42 6508.1 111.8 2415.32 S 6043.29 E 9600.00 61.60 110.68 S 69 19 E 1.16 6217.36 6530.0 111.8 2423.11 S 6063.83 E 9625.00 61.65 110.61 S 69 23 E 0.32 6229.24 6552.0 111.8 2430.86 S 6084.41 E 9650.00 61.95 110.42 S 69 35 E 1.39 6241:05 6574.1 111.8 2438.58 S 6105.05 E 9675.00 62.15 110.23 S 69 46 E 1.04 6252.77 6596.1 1 11.8 2446.26 S 6125.76 E 9700.00 62.16 110.20 S 69 48 E 0.10. 6264.44 6618,2 111.8 2453.89 S 6146.50 E 9725.00 62.59 110.22 S 69 47 E 1.72 6276.03 6640.4 111.8 2461.55 S 6167,29 E 9750.00 62.51 110.26 S 69 44 E 0.38 6287.56 6662.6 111.8 2469.22 S 6188.10 E 9775.00 62.73 ] 10.23 S 69 46 E 0.89 6299.05 6684.7 1 1 1.7 2476.91 S 6208.93 E 9800.00 62.50 109.82 S 70 1 ] E 1.71 6310.55 6706.9 1 1 1.7 2484.51 S 6229.79 E 9825.00 62.58 109.68 S 70 19 E 0.60 6322.08 6729.1 111.7 2492.00 S 6250,66 E 9850.00 62.45 ] 09.65 S 70 21 E 0.53 6333.62 6751.3 1 1 1.7 2499.47 S 6271.55 E 9875.00 62.83 109.53 S 70 28 E 1.57 6345.11 6773.5 111.7 2506.91 S 6292.47 E 9900.00 62.58 109.31 S 70 41 E 1.28 6356.58 6795.7 111.7 2514.30 S 6313.42 E 9925.00 62.83 109.14 S 70 52 E 1.17 6368.04 6817.9 111.7 2521.61 S 6334.40 E 9950.00 62.87 108.89 S 71 7 E 0.91 6379.45 6840.1 111.7 2528.86 S 6355.43 E 4975.00 63.02 108.64 S 71 22 E 1.08 6390.83 6862.3 111,7 2536.02 S 6376.51 E 10000.00 63.28 108.50 S 71 30 E l .18 6402.12 6884.6 1 11.7 2543,12 S 6397.65 E 10025.00 63.11 108.31 S 71 42 E 0.99 6413.39 6906.9 111,7 2550.17 S 6418.82 E 10050.00 63.40 108. l6 S 71 51 E 1.25 6424.64 6929.1 11 ] .7 2557.15 S 6440.03 E 10075.00 63.38 107.92 S 72 5 E 0.83 6435.84 6951.4 111.6 2564.08 S 6461.28 E 10]00.00 63.26 107.73 S 72 l6 E 0.84 6447.06 6973.7 111.6 2570.92 S 6482.55 E IS • A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad W ell: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK 1107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH CO ORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 10125.00 63.37 107.52 S 72 29 E 0.89 6458.29 6996.0 111.6 2577.68 S 6503.84 E 10150.00 63.43 107.34 S 72 40 E 0.66 6469.48 7018.3 111.6 2584.37 S 6525.16 E 10175.00 63.57 107.14 S 72 52 E 0.93 6480.64 7040.6 111.6 2591.01 S 6546:53 E ] 0200.00 63.65 107.02 S 72 59 E 0.51 6491.75 7062.9 1 11.6 2597.58 S 6567.94 E 10225.00 63.97 106.95 S 73 3 E 1.32 6502.78 7085.3 111.6 2604.14 S 6589.39 E 10250.00 64.13 106.92 S 73 5 E 0.65 6513.72 7107.7 111.5 2610.68 S 6610,90 E 10275.00 64.33 106.90 S 73 6 E 0.79 6524.59 7130.2 111.5 2617.23 S 6632.44 E 10300.00 63.63 ] 07.26 S 72 45 E 3.07 6535.56 7152.6 1 1 1.5 2623.83 S 6653.91 E 10325.00 62.99 107.46 S 72 33 E 2.63 6546.79 7174.8 111.5 2630.49 S 6675.23 E 10350.00 63.07 107.46 S 72 33 E 0.28 6558.13 7197,1 1 1 1.5 2637.18 S 6696.49 E 10375.00 63.44 107.95 S 72 3 E 2.30 6569.38 7219.3 111.5 2643.96 S 6717.75 E 10400.00 63.05 109.01 S 70 59 E 4.12 6580.63 7241.6 111.5 2651.04 S 6738.93 E 10425.00 62.78 109.43 S 70 34 E ].82 6592.02 7263.9 111.5 2658.37 S 6759.94 E 10450.00 63.21 109.50 S 70 30 E 1.73 6603.37 7286.1 111.5 2665.79 S 6780.95 E 10475.00 63.56 109.88. S 70 7 E 1,95 6614.57 7308.5 1 1 1.5 2673.32 S 6801.99 E 10500.00 63.95 110.05 S 69 57 E 1.69 6625.62 7330,9 111.5 2680.98 S 6823.07 E 10525.00 63.96 110.04 S 69 58 E 0.06 6636.60 7353.3 111.4 2688.68 S 6844.17 E 10550.00 64.1 ] 109.90 S 70 6 E 0.78 6647.54 7375.8 1 1 1.4 2696.35 S 6865.29 E 10575.00 64.27 109.78 S 70 13 E 0.78 6658.42 7398.3 11 ] .4 2703.99 S 6886.46 E 10600.00 64.60 109.60 S 70 24 E ] .47 6669.21 7420.8 1 1 1.4 271 1.59 S 6907.70 E 10625.00 65.03 109.42 S 70 35 E 1.82 6679.85 7443.5 111.4 2719.15 S 6929.02 E 10650.00 65.16 ]09.26 S 70 45 E 0.81 6690.38 7466.1 111.4 2726.66 S 6950.42 E 10675.00 65.44 109.09 S 70 55 E 1.25 6700.82 7488.8 ] 1 1.4 2734.12 S 6971.87 E 10700.00 65.55 108.88 S 71 7 E 0.89 671 1.19 751 1.5 1 1 1.4 2741,52 S 6993.38 E 10725.00 65.63 108.67 S 71 20 E 0.82 6721.53 7534.3 111.4 2748.84 S 7014.93 E 10750.00 65.75 108.75 S 71 I S E 0.59 6731.82 7557.0 1 11.4 2756.15 S 7036.51 E 16 BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK 1 107G 562 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEA RING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 10775.00 65.20 108.98 S 71 1 E 2.34 6742.19 7579.8 111.4 2763.50 S 7058.04 E 10800.00 64.89 ] 09.04 S 70 57 E 1.29 6752.74 7602:4 1 11.4 2770.89 S 7079.47 E 10825.00 64.89 109.00 S 71 0 E 0.17 6763.3.5 7625.0 111.4 2778.26 S 7100.87 E 10850.00 64.63 108.93 S 71 4 E 1.06 6774.01 7647.6 111.4 2785.61 S 7122.25 E 10875.00 64.37 108.85 S 71 9 E 1.09 6784.77 7670.2 111.4 2792.92 S 7143.60 E 10900.00 63.68 108.64 S 71 21 E 2.87 6795.72 7692.6 111.3 2800.14 S 7164.89 E 10925.00 63.56 108.46 S 71 32 E 0.79 6806.83 7715.0 111.3 2807.27 S 7186.12 E ]0950.00 63.78 108.95 S 71 3 E 1.95 6817.92 7737.4 111.3 2814.46 S 7207.34 E 10975.00 63.37 1 ] 0.23 S 69 46 E 4.86 6829.04 7759.7 1 1 1.3 2821.96 S 7228.43 E 11000.00 63.67 110.56 S 69 27 E 1.68 6840.19 7782.1 111.3 2829.76 S 7249.41 E 11025.00 63.b9 110.62 S 69 23 E 0.23 6851.27 7804.5 111.3 2837.64 S 7270.39 E 11050.00 63.32 111.16 S 68 51 E 2.45 6862.43 7826.9 111.3 2845.62 S 7291.29 E ] 1075.00 62.77 1 11.71 S 68 17 E 2.93 6873.76 78492 1 1 1.3 2853.76 S 7312.03 E 11100.00 62.39 11 1.97 S 68 2 E ] .78 6885.27 7871.4 1 1 1.3 2862.02 S 7332.63 E 11125.00 62.67 111.88 S 68 7 E 1.14 6896.80 7893.6 111.3 2870.30 S 7353.21 E 11150.00 62.48 111.75 S 68 15 E 0.89 6908.32 7915.7 111.3 2878.55 S 7373.81 E 11175.00 62.69 111.57 S 68 26 E 1.10 6919.83 7937.9 111.3 2886.74 S 7394.43 E 11200.00 62.97 111.49 S 68 31 E 1.15 6931.24 7960.2 111.3 2894.90 S 7415.13 E 11225.00 62.86 111.28 S 68 43 E 0.87 6942.62 7982.4 111.3 2903.01 S 7435.85 E 1 1250.00 63.28 1 1 ] .13 S 68 52 E 1.80 6453.95 8044.7 l 1 1.3 2911.08 S 7456.63 E 11275.00 63.44 110.98 S 69 1 E 0.82 6965.16 8027.1 111.3 2919.10 S 7477.48 E 11300.00 63.61 110.91 S 69 5 E 0.73 6976.30 8049.5 111.3 2927.10 S 7498,38 E 11325.00 64.07 110.94 S 69 3 E 1.83 6987.33 8071.9 111.3 2935.12 S 7519.34 E 11350.00 63.12 111.36 S 68 38 E 4.09 6998.44 8094.3 111.3 2943.20 S 7540.22 E 11375.00 62.20 111.56 S 68 26 E 3.72 7009.93 8116.5 111.3 2951.32 S 7560.89 E 11400.00 61.81 111.66 S 68 20 E 1.61 7021.66 8138.6 111.3 2959.45 S 7581.42 E 11425.00 61.77 1 ] 1.58 S 68 25 E 0.35 7033.48 8160.6 1 ] 1.3 2967.57 S 7601.90 E n U 17 BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AKl ]07G 562 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH D1ST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft, 11450.00 61.86 111.36 S 68 39 E 0.87 7045.29 8182.6 111.3 2975.64 S 7622.40 E 11475.00 61.82 111.19 S 68 49 E 0.61 7057.08 8204.7 111.3 2983.63 S 7642.94 E 11500.00 61.87 111.01 S 68 59 E 0.66 7068.88 8226.7 111.3 2991.57 S 7663.51 E 11525.00 61.83 110.90 S 69 6 E 0.43 7080.67 8248.8 111.3 2999.45 S 7684.09 E 11550.00 61.59 110.79 S 69 12 E 1.04 7092.52 8270.8 111.3 3007.29 S 7704.66 E 11575.00 61.84 110.52 S 69 29 E 1.39 7104.37 8292.8 111.3 3015.05 S 7725.26 E ] 1600.00 61.72 110.35 S 69 39 E 0.75 7116.19 8314,8 1 1 1.3 3022.74 S 7745.90 E 11625.00 61.66 ] 10.19 S 69 49 E 0.63 7128.05 8336.8 1 11.3 3030.37 S 7766.55 E 1650.00 61.58 109.90 S 70 6 E 1.08 7139.93 8358.8 1 1 1.3 3037.91 S 7787.22 E 11675.00 61.72 109.64 S 70 22 E 1.07 7151.80 8380.8 111.3 3045.35 S 7807.92 E 11700.00 61.44 109.35 S 70 39 E 1.50 7163.70 8402.8 111.3 3052.68 S 7828.65 E 11725.00 61.54 109.20 S 70 48 E 0.66 7175.63 8424.7 111.3 3059.93 S 7849.38 E 11750.00 61.65 109.01 S 70 59 E 0.79 7187.52 8446.7 111.3 3067.13 S 7870.16 E 11775.00 61.69 108.90 S 71 6 E 0.43 7199.39 8468.7 111.3 3074.28 S 7890.98 E 11800.00 61.49 108.91 S 71 5 E 0.83 721 i.28 8490.7 111.3 3081.40 S 791 1.78 E 11825.00 61.51 109.63 S 70 22 E 2.53 7223.21 8512.6 111.3 3088.65 S 7932.52 E 11850.00 61.38 110.55 S 69 27 E 3.28 7235.16 8534.6 111.3 3096.20 S 7953.14 E 11875.00 61.38 110.77 S 69 14 E 0.75 7247.13 8556.5 111.3 3103.94 S 7973.68 E 11900.00 61.62 111.06 S 68 56 E 1.40 7259.06 8578.5 111.3 3111.78 S 7994.20 E 11925.00 6 ] .71 112.25 S 67 45 E 4.19 7270.93 8600.5 111.3 31 19.90 S 8014.65 E 11950.00 61.85 113.11 S 66 54 E 3.09 7282.75 8622.5 111.3 3128.39 S 8034.98 E 11975.00 61.92 113.20 S 66 48 E 0.44 7294.53 8644.5 111.3 3137.06 S 8055.25 E 12000.00 61.69 112.97 S 67 2 E 1.21 7306.35 8666.6 ] 11.3 3145.70 S 8075.52 E 12025.00 61.75 112.75 S 67 15 E 0.80 7318.19 8688.6 111.3 3154.26 S 8095.81 E 12050.00 61.65 112.63 S 67 22 E 0.61 7330.04 8710.6 111.3 3162.75 S 8116.11 E 12075.00 61.63 1 ] 2.42 S 67 35 E 0.73 7341.92 8732.6 1 1 1.3 3171.17 S 8136.44 E 12100.00 61.50 112.33 S 67 40 E 0.63 7353.82 8754.6 111.3 3179.54 S 8156.77 E i 18 BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AKI ]07G 562 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet ] 00 ft. 12125.00 61.36 112.29 S 67 42 E 0.59 7365.77 8776.5 111.3 3187.88 S 8177.08 E 12 ] 50.00 61.37 112.2 ] S 67 47 E 0.30 7377.76 8798.5 1 1 1.3 3196.19 S 8197.39 E 12175.00 61.28 112.06 S 67 57 E 0.65 7389.75 8820.4 111.3 3204.45 S 8217.70 E 12200.00 61.55 ] 12.01 S 68 0 E 1.09 740 ] .72 8842.3 1 1 1.3 3212.69 S 8238.05 E 12225.00 61.13 111.88 S 68 7 E 1.71 7413.70 8864.3 111.3 3220.88 S 8258.40 E 12250.00 61.27 111.74 S 68 16 E 0.75 7425.75 8886.2 111.3 3229.02 S 8278.74 E 12275.00 61.06 11 ] .62 S 68 23 E 0.95 7437.80 8908.1 1 1 1.3 3237.1. l S 8299.09 E 12300.00 61.40 111.54 S 68 27 E 1.40 7449.84 8930.0 111.3 3245.18 S 8319.47 E 12325.00 61.25 111.34 S 68 39 E 0.94 7461.83 8951.9 111.3 3253.19 S 8339.88 E 12350.00 61.24 1 1 1.26 S 68 44 E 0.29 7473.86 8973.8 1 1 ] .3 3261.16 S 8360.30 E 12375.00 61.27 1 ] 1.06 S 68 56 E 0.73 7485.88 8995.8 1 1 1.3 3269.07 S 8380.74 E 12400.00 61.15 110.97 S 69 2 E 0.59 7497.93 9017.7 111.3 3276.93 S 8401.20 E 12425.00 61.29 110.87 S 69 8 E 0.67 7509.96 9039.6 111.3 3284.75 S 8421.66 E 12450.00 61.14 110.70 S 69 18 E 0.83 7522.00 9061.5 111.3 3292.52 S 8442.15 E 12475.00 61.06 110.52 S 69 29 E 0.72 7534.08 9083.4 111.3 3300.23 S 8462.63 E 12500.00 61.13 110.40 S 69 36 E 0.49 7546.17 9105.3 111.3 3307.88 S 8483.14 E 12525.00 61.01 110.34 S 69 40 E 0.50 7558.26 9127.1 111.3 3315.49 S 8503.65 E 12550.00 61.24 110.10 S 69 54 E 1.23 7570.33 9149.0 1 11.3 3323.06 S 8524,19 E 12575.00 61.30 110.07 S 69 56 E 0.25 7582.35 9170.9 ] 11.3 3330.59 S 8544.78 E 12600.00 61.18 109.92 S 70 5 E 0.70 7594.38 9192.8 1 1 ] .3 3338.08 S 8565.38 E 12625.00 61.41 110.01 S 69 59 E 0.97 7606.39 9214.8 111.3 3345.57 S 8585.99 E 12650.00 61.05 110.04 S 69 58 E 1.42 7618.42 9236.7 111.3 3353.07 S 8606.58 E 12675.00 61.14 109.68 S 70 ]9 E 1.29 7630.50 9258.6 111.3 3360.51 S 8627.16 E 12700.00 60.98 109.62 S 70 23 E 0.67 7642.60 9280.4 111.3 3367.87 S 8647.76 E ] 2725.00 60.82 109.45 S 70 33 E 0.88 7654.76 9302.3 1 11.3 3375.17 S 8668.35 E 12750.00 60.89 109.44 S 70 34 E 0.26 7666.93 9324.1 111.3 3382.44 S 8688.94 E 19 BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK 1 107G 562 A Gyrodata Directional Survey MEASURED i N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDIN ATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 12775.00 60.71 109.37 S 70 38 E 0.77 7679.13 9345.9 111.3 3389.69 S 8709.52 E 12800.00 60.72 109.24 S 70 46 E 0.47 7691.36 9367'.7 111.3 3396.90 S 8730.10 E 12825.00 60.54 ]09.]4 S 70 52 E 0.80 7703.62 9389.5 111.3 3404.06 S 8750.68 E 12850.00 60.44 ] 09.02 S 70 59 E 0.57 7715.94 9411.2 111.3 3411.17 S 8771.24 E 12875.00 60.57 108.70 S 71 18 E 1.25 7728.25 9432.9 111.2 3418.20 S 8791.83 E 12900.00 60.48 108.50 S 71 30 E 0.79 7740:55 9454.7 111.2 3425.15 S 8812.46 E 12925.00 60.62 108.32 S 71 41 E 0.82 7752.84 9476.4 111.2 3432.02 S 8833.11 E 12950.00 60.53 108.11 S 71 53 E 0.81 7765.12 9498.2 111.2 3438.83 S 8853.80 E 12975.00 60.28 107.95 S 72 3 E 1.15 7777.47 9519.9 111.2 3445.56 S 8874.47 E 13000.00 60.34 107.75 S 72 15 E 0.74 7789.85 9541.6 111.2 3452.21 S 8895.14 E 13025.00 60.18 107.51 S 72 30 E 1.09 7802.25 9563.2 111.2 3458.79 S 8915.83 E 13050.00 60.05 107.75 S 72 15 E 0.99 7814.71 9584.9 111.2 3465.35 S 8936.49 E 13075.00 59.50 109.00 S 71 0 E 4.84 7827.29 9606.4 111.2 3472.16 S 8956.99 E 13100.00 59.23 109.67 S 70 20 E 2.56 7840.03 9627.9 111.2 3479.28 S 8977.28 E 13125.00 59.46 109.63 S 70 22 E 0.96 7852.78 9649.4 111,2 3486.51 S 8997.54 E 13150.00 59.28 110.22 S 69 47 E 2.18 7865.52 9670.9 111.2 3493.84 S 9017.76 E 13175.00 58.88 111.76 S 68 14 E 5.52 7878.36 9692.4 111.2 3501.52 S 9037.78 E 13200.00 58.75 112.34 S 67 40 E 2.06 7891.31 9713.8 111.2 3509.55 S 9057.61 E 13225.00 58.63 112.07 S 67 56 E 1.04 7904.30. 9735.1 111.2 3517.63 S 9077.38 E 13250.00 58.31 112.76 S 67 15 E 2.66 7917.38 9756.4 1 1 1,2 3525.75 S 9097.08 E 13275.00 57.61 113.33 S 66 40 E 3.42 7930.64 9777.6 111.2 3534.05 S 9116.58 E 13300.00 57.43 113.73 S 66 16 E 1.54 7944.07 9798.7 111.2 3542.46 S 9135.92 E 13325.00 57.29 113.37 S 66 38 E 1.34 7957.55 9819.7 111.2 3550.88 S 9155.21 E 13350.00 57.05 113.14 S 66 51 E 1.21 7971.11 9840.7 111.2 3559.17 S 9174.51 E 13375.00 57.15 112.86 S 67 9 E 1.04 7984.68 9861.7 111.2 3567.37 S 9193.84 E 13400.00 56.82 112.68 S 67 19 E 1.45 7998.30 9882.6 111.2 3575.48 S 9213.17 E 13425.00 56.85 l 12.43 S 67 34 E 0.83 SOl l .98 9903.6 111.2 3583.5 l S 9232.49 E C~ 20 BP Exploration (Alaska) Inc. Lease: P-Pad Well: PZ-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number; AK 1 107G .562 A Gyrodata Directional Survey MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH CO ORDIN ATES feet deg. deg, deg. min. deg./ feet feet deg. feet 100 ft. 13450.00 56.66 112.18 S 67 49 E 1.12 8025.69 9924.5 111.2 3591.45 S 9251.84 E 13475.00 56.36 111.97 S 68 2 E 1.40 8039.48 9945.3 111.2 3599.29 S 9271.16 E 13500.00 56.50 111.95 S 68 3 E 0.58 8053.30 9966.1 111.2 3607.08 S 9290.48 E 13525.00 56.42 111.76 S 68 14 E 0.70 8067.11 9987.0 111.2 3614.83 S 9309.82 E 13550.00 56.48 111.63 S 68 22 E 0.50 8080.93 10007.8 111.2 3622.54 S 9329.18 E ] 3575.00 56.40 111.46 S 68 32 E 0.65 8094.75 10028.6 1 1 1.2 3630.19 S 9348.55 E 13600.00 56.06 111.16 S 68 50 E 1.68 8108.65 10049.4 111.2 3637.74 S 9367.91 E 13625.00 56.22 111.08 S 68 55 E 0.68 8122.58 10070.2 111.2 3645.22 S 9387.28 E 13650.00 55.96 110.68 S 69 19 E 1.67 8136.52 10090.9 111.2 3652,62 S 9406.66 E 13675.00 55.89 110.75 S 69 15 E 0.38 8150.53 ]0111:6 111.2 3659.94 S 9426.03 E 13700.00 55.70 110.40 S 69 36 E 1.38 8164.59 10132.3 111.2 3667.21 S 9445.39 E 13725.00 55.50 110.30 S 69 42 E 0.87 8178.71 10152.9 111.2 3674.38 S 9464.73 E 13750.00 55.46 110.08 S 69 55 E 0.73 8192.88 10173.5 111.2 3681.49 S 9484.06 E 13775.00 55.30 109.97 S 70 2 E 0.72 8207.08 10194.1 111.2 3688.54 S 9503.39 E 13800.00 55.14 109.78 S 70 13 E 0.90 8221.34 10214.6 111.2 3695.52 S 9522.70 E 13825.00 55.22 109.57 S 70 26 E 0.74 8235.62 10235.1 111.2 3702.43 S 9542.03 E 13850.00 55.02 109.43 S 70 34 E 0.94 8249.91 10255.6 111.2 3709.28 S 9561.36 E 13875.00 54.65 108.88 S 71 7 E 2.33 8264.31 10276.1 111.2 3715.98 S 9580.67 E 13900.00 54.83 108.64 S 71 22 E 1.03 8278.74 10296.5 111.2 3722.55 S 9600.00 E 13925.00 SS.II 109.37 S 70 38 E 2.64 8293.09 10316.9 111.2 3729.21 S 9619.35 E 13950.00 55.32 110.81 S 69 ll E 4.83 8307.35 10337.5 111.2 3736.27 S 9638.63 E 13975.00 55.21 111.11 S 68 53 E 1.08 8321.60 10358.0 111.2 3743.62 S 9657.82 E 14000.00 55.20 111.13 S 68 52 E 0.06 8335.86 10378.5 111.2 3751.01 S 9676.97 E 14025.00 55.13 110.66 S 69 20 E 1.57 8350.14 10399.0 111.2 3758.33 S 9696.14 E 14050.00 54.95 110.30 S 69 42 E 1.40 8364.47 10419.5 111.2 3765.50 S 9715.34 E ]4075.00 54.78 110.01 S 69 59 E 1.14 8378.85 10440.0 111.2 3772.54 S 9734.53 E 14100.00 54.74 109.94 S 70 3 E 0.28 8393.28. 10460.4 111.2 3779.52 S 9753.72 E 21 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AK 1107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min. deg./ feet feet deg. feet 100 ft. 14125.00 54.71 109.93 S 70 4 E 0.13 8407.72 10480.8 111.2 3786.48 S 9772.91 E 14150.00 54.99 110.05 S 69 57 E 1.18 8422.11 10501.2 111.2 3793.47 S 9792.12 E 14175.00 54.83 110.04 S 69 57 E 0.64 8436.48 1052].7 111.2 3800.48 S 9811.33 E 14200.00 55.02 109.83 S 70 10 E 1.04 8450.85 10542.1 111.2 3807.46 S 9830.57 E 14225.00 55.06 109.90 S 70 6 E 0.29 8465.17 10562.6 111.2 3814.42 S 9849.84 E 14250.00 54.89 109.66 S 70 21 E 1.05 8479.52 10583.1 1 1 1.2 3821,35 S 9869.10 E 14275.00 55.14 109.77 S 70 14 E 1.05 8493.86 10603.6 111.2 3828.26 S 9888.38 E 14300.00 55.04 109.67 S 70 20 E 0.50 8508.16 10624.1 111.2 3835.17 S 9907.68 E 14325.00 55.24 109.92 S 70 5 E 1.14 8522.45 10644,6 111.2 3842.12 S 9926.98 E 14350.00 55.27 109.71 S 70 17 E 0.69 8536.70 10665.1 111.2 3849.09 S 9946.31 E 14375.00 55.23 109.41 S 70 35 E 1.01 8550.95 10685.6 111.2 3855.96 S 9965.66 E 14400.00 54.55 110.00 S 70 0 E 3.34 8565.33 10706.1 Il 1.1 3862.86 S 9984.92 E 14425.00 53.03 109.77 S 70 14 E 6.14 8580.10 10726.3 111.1 3869.72 S 10003.88 E 14450.00 51.95 110.36 S 69 38 E 4,69 8595.32 10746.1 111.1 3876.53 S 10022.51 E 14475.00 52.18 110.34 S 69 40 E 0.92 8610.69 10765.8 111.1 3883.38 S 10041.00 E 14500.00 52.11 109.92 S 70 5 E 1.35 8626.03 10785.5 111.1 3890.18 S 10059.53 E 14525.00 52.26 110.22 S 69 47 E 1.13 8641.36 10805.3 111.1 3896.95 S ]0078.08 E 14550.00 52.18 110.13 S 69 52 E 0.41 8656.67 10825.0 111.1 3903.77 S 10096.63 E 14575.00 52.00 109.54 S 70 28 E 2.02 8672.03 10844.8 111.1 3910.46 S 10115.19 E 14600.00 51.82 109.96 S 70 2 E 1.51 8687.45 10864.4 111.1 3917.11 S 10133.70 E 14625.00 51.70 109.69 S 70 19 E 0.98 8702.93 10884.1 111.1 3923.77 S 10152.18 E 14650.00 51.76 109.40 S 70 36 E 0.96 87 ] 8.41 10903.7 111.1 3930.34 S 10170.67 E 14675.00 51.66 109.31 S 70 41 E 0.47 8733.90 ] 0923.3 1 1 1.1 3936.84 S 10189.19 E 14700.00 51.65 109.21 S 70 47 E 0.32 8749.4] 10942.9 111.1 3943.31 S 10207.70 E 14725.00 51.81 109.08 S 70 55 E 0.74 8764.90 10962.5 111.1 3949.74 S 10226.24 E 14750.00 S l .76 109.17 S 70 50 E 0.34 8780.36 10982.1 111.1 3956.1.8 S 10244.80 E 22 A Gyrodata Directional Survey BP Exploration (Alaska) Inc. Lease: P-Pad Well: P2-45A, 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska Job Number: AKl 107G 562 MEASURED I N C L AZIMUTH BORE HOLE DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH BEARING SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg. min, deg./ feet feet deg. feet 100 ft. 14775.00 51.86 ] 09.18 S 70 49 E 0.42 8795.82 1 1001:8 1 1 1.1 3962.63 S 10263.35 E 14800.00 52.02 108.85 S 71 9 E 1.24 8811.23 11021.4 111.1 3969.05 S 10281,97 E 14825.00 52.03 108.66 S 71 21 E 0.60 8826.61 11041.1 111.1 3975.38 S 10300.63 E 14850.00 52.20 108.46 S 71 32 E 0.92 8841.97 11060.8 111.1 3981.66 S 10319.33 E 14875.00 52.42 108.61 S 71 23 E 0.97 8857.25 11080.6 111.1 3987.95 S 10338.09 E 14900.00 52.03 108.30 S 71 42 E 1.82 8872.56 11100.3 111.1 3994.21 S 10356.83 E 14925.00 52.09 108.06 S 7] 56 E 0.78 8887.94 11120.0 111.1 4000.36 S 10375.57 E 14950.00 51.90 107.95 S 72 3 E 0.82 8903.33 11139.7 111.1 4006.45 S 10394.30 E 14975.00 52.01 108.08 S 71 55 E 0.58 8918.74 11159.4 111.1 4012.54 S 10413.02 E 15000.00 51.75 107.93 S 72 4 E 1.12 8934.17 11179.0 111.1 4018.62 S 10431.73 E 15025.00 51.69 107.87 S 72 8 E 0.31 8949.66 11198.6 111.1 4024.65 S 10450,40 E 15050.00 51.53 107.79 S 72 12 E 0.68 8965:18 11218.2 l l 1.1 4030.65 S 10469.05 E 15075.00 51.46 107.87 S 72 8 E 0.39 8980.75 11237.7 111.1 4036.64 S 10487.68 E 15100.00 51.62 107.78 S 72 13 E 0.73 8996.29 11257.2 111.0 4042.64 S 10506.31 E 15125.00 S 1.83 107.75 S 72 15 E 0.83 901 1.78 1 1276.8 1 1 1.0 4048.63 S 10525.01 E 15150.00 52.18 107.75 S 72 1 S E 1.42 9027.17 1 1296.5 1 1 1.0 4054.63 S 10543 77 E 15175.00 52.50 107.68 S 72 19 E 1.27 9042.44 11316.3 111.0 4060.65 S . 10562.62 E 15200.00 52.63 107.67 S 72 20 E 0.55 9057.64 11336.1 111.0 4066.68 S 10581.54 E 15225.00 52.89 107.67 S 72 20 E 1.05 9072.77 11356.0 111.0 4072.72 S 10600.50 E 15250.00 53.00 107.61 S 72 24 E 0.47 9087.83 11375.9 111.0 4078.77 S 10619.51 E Final Station Closure: Distance: l 1375.87 ft Az: 111.01 deg. 23 BP Exploration (Alaska) Inc. Well: P-Pad P2-45A 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska 0 -500 -1000 -1500 .- z -2000 O z -2500 -3000 -3500 -4000 Interp Outrun Gyrodata AK1107G 562 DEFINITIVE - -- -------- ---- -- BO OM HOLE MD 15250.00 i i 0 10 00 20 00 30 00 40 00 50 00 60 00 70 00 80 00 90 00 100 00 110 0( FASTING (ft) BP Exploration (Alaska) Inc. Well: P-Pad P2-45A 4-1/2" Tubing Location: Mast Truck, Prudhoe Bay, Alaska 20 18 16 14 ,-. 0 0 X12 a~ -~ .~ X10 w w ~ 8 O 6 4 2 0 Interp Outrun Gyrodata AK1107G_562 DEFINITIVE BOTT LOCA MD: M HOLE ED 5250.00 0 20 00 4000 60 00 80 00 10000 120 00 140 00 160 00 MEASURED DEPTH (ft) BP Exploration (Alaska) Inc. Well: P-Pad P2-45A 4-1/2" Tubing Location: Mast Truck, Prudhoe Bav, Alaska Interp Outrun ` Gyrodata AK1107G_562 DEFINITIVE 65 60 55 50 45 z 40 O z 35 J V 30 25 20 15 10 5 BO OM HOLE TE--~- MD: 5250.00 0 2000 4000 6000 8000 10000 12000 14000 16000 MEASURED DEPTH (ft) Survey QC - RGS-CT Specification Sheet ~~ SURVEY QUALITY CONTROL -SPECIFICATION DATA tNrrrnlrSarrnN Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs (ERNeas-ERrneo) 220 13.97 98.01 0.0653 221 13.97 98.01 0.0468 222 13.97 98.03 0.0639 223 13.97 98.15 0.0427 224 13.97 98.07 0.0583 225 13.97 98.01 0.0873 226 13.97 98.35 0.0794 Average 13.97 98.09 0.0634 Tolerance on Average* 0.0825 Standard Deviation 0.00 0.12 0.0199 Tolerance on St. Dev.** 0.1° 0.2° 0.0370 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1/CosI) * J[(CosA*SinI*0.1)2+ana2~ o/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/CosI) *v[(CosA*SinI*0.1)2+(0.082/(n-1))) o/hr DRIFT TUNES Drift Tune Number Ending Time Ending Depth Ending Inclination Ending Azimuth Residual Gx Bias Residual Gy Bias Start End Start End 1 6405.91 15251.56 49.36 107.75 -0.000 0.012 -0.000 0.000 2 774.73 14886.86 52.04 108.28 -0.002 0.003 -0.000 0.002 3 1108.34 13782.28 55.15 109.81 0.001 0.001 -0.002 0.004 4 1260.23 12213.19 61.13 111.88 -0.000 -0.000 0.001 0.002 5 971.89 11154.56 62.61 111.61 -0.002 0.002 0.001 -0.000 6 1199.58 9795.69 62.62 109.71 0.001 -0.001 -0.001 0.002 7 1503.03 8108.16 62.06 111.16 0.000 -0.000 -0.000 0.002 8 1396.81 5889.87 56.73 113.62 -0.000 -0.000 0.000 0.001 9 1396.75 3980.13 55.92 113.73 -0.001 -0.000 -0.001 0.003 10 1351.23 1718.73 22.32 110.68 -0.000 -0.000 0.000 0.001 11 547.13 1196.12 14.99 100.98 -0.000 0.000 0.000 0.001 Average -0.000 0.001 -0.000 0.002 Standard Deviation 0.001 0.003 0.001 0.001 Tolerance for both the Average and the Standard Deviation 0.033°/hr 0.033°/hr 0.033°/hr 0.033°/hr INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * ~ Outrun * ~ Difference ~ Inrun * ~ Outrun * ~ Difference 1200.00 14.08 14.32 -0.25 99.11 99.08 0.03 1225.00 14.95 15.15 -0.20 100.88 101.19 -0.30 1250.00 16.02 15.97 0.05 101.98 102.06 -0.08 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 1 of 14 AK3107G_562 Survey QC - RGS-CT Specification Sheet ~..~. o. 1275.00 16.38 16.38 0.00 102.31 102.39 -0.08 1300.00 16.86 16.76 0.10 102.55 102.55 -0.00 1325.00 17.17 17.07 0.09 102.93 103.00 -0.08 1350.00 17.37 17.24 0.13 103.15 103.25 -0.10 1375.00 17.62 17.47 0.15 103.94 103.96 -0.02 1400.00 17.81 17.68 0.14 104.32 104.56 -0.24 1425.00 18.07 17.92 0.15 105.01 105.18 -0.17 1450.00 18.36 18.22 0.15 105.96 106.14 -0.18 1475.00 18.60 18.55 0.05 106.35 106.55 -0.20 1500.00 19.35 19.32 0.03 107.31 107.60 -0.29 1525.00 19.96 19.92 0.04 108.28 108.62 -0.34 1550.00 20.37 20.16 0.21 109.06 109.05. 0.01 1575.00 20.63 20.41 0.21 109.58 109.63 -0.05 1600.00 20.80 20.60 0.20 109.85 110.01 -0.16 1625.00 21.01 20.77 0.25 110.64 110.60 0.04 1650.00 21.18 20.96 0.22 110.81 110.78 0.03 1675.00 21.42 21.18 0.25 110.97 110.85 0.12 1700.00 21.97 21.80 0.17 110.91 110.77 0.14 1725.00 22.34 22.09 0.26 110.86 110.75 0.11 1750.00 22.61 22.30 0.30 110.79 110.68 0.11 1775.00 22.78 22.48 0.30 110.76 110.63 0.13 1800.00 22.95 22.64 0.31 110.76 110.65 0.11 1825.00 23.18 22.88 0.30 110.61 110.45 0.16 1850.00 23.49 23.35 0.14 110.46 110.08 0.39 1875.00 24.79 24.79 -0.01 109.30 108.93 0.37 1900.00 26.51 26.69 -0.18 108.53 108.20 0.33 1925.00 27.67 27.46 0.21 108.10 107.82 0.28 1950.00 28.43 28.26 0.17 107.20 106.73 0.47 1975.00 29.24 29.00 0.24 106.03 105.64 0.38 2000.00 29.75 29.40 0.35 105.47 105.33 0.15 2025.00 30.05 29.71 0.33 105.47 105.32 0.15 2050.00 30.26 29.91 0.35 105.49 105.36 0.13 2075.00 30.50 30.15 0.35 105.68 105.57 0.11 2100.00 30.75 30.35 0.40 105.73 105.59 0.14 2125.00 30.86 30.46 0.41 105.70 105.53 0.17 2150.00 30.67 29.91 0.76 104.96 104.22 0.74 2175.00 30.29 29.89 0.41 103.98 103.79 0.20 2200.00 30.40 29.94 0.46 103.78 103.51 0.27 2225.00 30.52 30.15 0.37 103.63 103.47 0.16 2250.00 30.74 30.36 0.38 103.67 103.53 0.14 2275.00 30.98 30.56 0.42 103.72 103.57 0.16 2300.00 31.19 30.77 0.42 103.74 103.55 0.18 2325.00 31.43 31.06 0.38 103.57 103.16 0.41 2350.00 31.94 31.58 0.37 102.31 101.92 0.39 2375.00 32.30 31.90 0.40 101.87 101.63 0.24 SURV-Q167 (OPS SUR-MA-003) 19~h Nov 03 /Rev 15 Page 2 of 14 AK1107G 562 Survey QC - RGS-CT Specification Sheet 2400.00 32.56 32.15 0.41 101.74 101.55 0.19 2425.00 32.76 32.37 0.40 101.77 101.61 0.17 2450.00 33.02 32.64 0.38 101.94 101.90 0.04 2475.00 33.32 32.90 0.42 102.66 102.58 0.08 2500.00 33.53 33.09 0.44 102.98 102.86 0.13 2525.00 33.75 33.31 0.44 103.24 103.09 0.15 2550.00 33.93 33.48 0.45 103.53 103.42 0.11 2575.00 34.09 33.62 0.47 103.79 103.63 0.16 2600.00 34.23 33.76 0.47 103.99 103.96 0.02 2625.00 34.17 33.63 0.54 104.58 104.64 -0.06 2650.00 33.95 33.44 0.51 105.41 105.44 -0.03 2675.00 34.02 33.58 0.44 106.17 106.25 -0.07 2700.00 34.30 33.98 0.31 107.12 107.33 -0.20 2725.00 34.82 34.49 0.33 108.59 108.79 -0.21 2750.00 35.30 34.97 0.33 109.56 109.57 -0.01 2775.00 35.84 35.48 0.36 110.15 110.02 0.13 2800.00 36.47 36.21 0.26 110.27 110.06 0.21 2825.00 37.62 37.37 0.25 110.04 109.79 0.24 2850.00 38.60 38.27 0.33 109.76 109.52 0.23 2875.00 39.03 38.72 0.31 109. 68 109.43 0.25 2900.00 39.58 39.21 0.37 _ 109.53 109.31 0.22 2925.00 40.07 39.78 0.29 109.40 109.18 0.23 2950.00 40.51 40.16 0.36 109.36 109.12 0.24 2975.00 41.05 40.67 0.39 109.20 108.98 0.22 3000.00 41.43 41.08 0.34 109.15 108.86 0.29 3025.00 41.81 41.41 0.40 108.96 108.75 0.20 3050.00 42.03 41.59 0.44 108.97 108.76 0.22 3075.00 42.20 41.75 0.45 109.00 108.80 0.20 3100.00 42.22 .41.74 0.48 108.99 108.85 0.14 3125.00 42.29 41.84 0.45 109.08 108.91 0.18 3150.00 42.51 42.11 0.39 109.16 108.96 0.19 3175.00 43.02 42.78 0.24 109.23 109.06 0.17 3200.00 43.66 43.41 0.25 109.28 109.10 0.18 3225.00 44.37 44.03 0.33 109.33 109.14 0.19 3250.00 44.83 44.58 0.26 109.37 109.17 0.20 3275.00 45.36 44.99 0.37 109.38 109.18 0.20 3300.00 45.85 45.52 0.34 109.49 109.34 0.15 3325.00 46.19 45.80 0.39 109.61 109.49 0.12 3350.00 46.50 46.10 0.40 110.07 110.01 0.06 3375.00 46.69 46.22 0.46 110.66 110.68 -0.02 3400.00 46.89 46.50 0.39 111.23 111.14 0.09 3425.00 47.31 46.97 0.34 111.78 111.81 -0.03 3450.00 47.85 47.58 0.27 112.56 112.57 -0.01 3475.00 48.60 48.35 0.26 113.57 113.64 -0.07 3500.00 49.28 49.06 0.23 114.35 114.39 -0.04 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 3 of 14 AK1107G_S62 Survey QC - RGS-CT Specification Sheet ~/J"~1 r~ 3525.00 50.01 49.73 0.28 115.11 115.07 0.04 3550.00 50.62 50.33 0.29 115.67 115.59 0.08 3575.00 51.16 50.77 0.39 116.04 115.94 0.09 3600.00 51.60 51.25 0.35 116.52 116.38 0.14 3625.00 51.96 51.57 0.39 116.80 116.61 0.19 3650.00 52.33 51.94 0.39 116.91 116.69 0.22 3675.00 52.62 52.24 0.37 116.96 116.75 0.22 3700.00 52.98 52.61 0.37 116.99 116.77 0.23 3725.00 53.28 52.95 0.33 116.99 116.76 0.23 3750.00 53.61 53.23 0.38 116.99 116.76 0.23 3775.00 53.89 53.55 0.34 116.97 116.72 0.25 3800.00 54.09 53.71 0.38 116.80 116.48 0.32 3825.00 54.32 53.91 0.41 116.45 116.01 0.44 3850.00 54.49 54.11 0.38 115.72 115.31 0.41 3875.00 54.76 54.34 0.42 114.96 114.53 0.44 3900.00 55.04 54.71 0.33 114.52 114.20 0.32 3925.00 55.51 55.18 0.33 114.17 113.85 0.32 3950.00 55.90 55.62 0.28 113.96 113.69 0.27 3975.00 56.29 55.95 0.34 113.85 113.62 0.23 4000.00 56.37 55.89 0.48 113.90 113.73 0.17 4025.00 56.32 55.99 0.32 113.97 113.80 0.17 4050.00 56.53 56.14 0.39 114.10 113.92 0.18 4075.00 56.59 56.11 0.49 114.12 113.90 0.22 4100.00 56.36 55.80 0.56 114.00 113.68 0.33 4125.00 56.05 55.47 0.58 113.54 113.17 0.37 4150.00 55.90 55.57 0.34 113.14 112.91 0.23 4175.00 56.15 55.84 0.31 113.08 112.91 0.16 4200.00 56.55 56.43 0.12 113.11 112.90 0.21 4225.00 57.67 57.63 0.05 113.06 112.84 0.22 4250.00 58.86 58.90 -0.03 112.93 112.67 0.25 4275.00 60.05 59.96 0.10 112.78 112.53 0.26 4300.00 60.74 60.46 0.27 112.68 112.50 0.18 4325.00 61.13 60.80 0.33 112.66 112.45 0.21 4350.00 61.28 60.98 0.30 112.59 112.41 0.18 4375.00 61.41 60.94 0.46 112.51 112.28 0.24 4400.00 61.32 60.99 0.33 112.43 112.23 0.20 4425.00 61.18 60.78 0.40 112.30 112.07 0.23 4450.00 61.10 60.69 0.41 112.15 111.96 0.19 4475.00 60.93 60.57 0.36 112.06 111.86 0.20 4500.00 60.93 60.46 0.47 112.01 111.81 0.20 4525.00 60.65 60.28 0.38 111.93 111.74 0.19 4550.00 60.25 59.87 0.38 111.87 111.70 0.17 4575.00 60.23 59.88 0.35 112.01 111.94 0.07 4600.00 60.13 59.85 0.28 112.38 112.28 0.10 4625.00 60.30 59.97 0.33 112.59 112.51 0.08 SURV-Q367.(OPS SUR-MA-003) 19u` Nov 03 /Rev 15 Page 4 of 14 AK1107G_S62 Survey QC - RGS-CT Specification Sheet ~..e 4650.00 60.50 60.29 0.21 112.77 112.62 0.15 4675.00 60.93 60.77 0.15 112.94 112.83 0.12 4700.00 61.47 61.37 0.10 113.06 112.95 0.10 4725.00 62.06 61.89 0.17 113.16 113.00 0.16 4750.00 62.18 61.74 0.44 113.30 113.26 0.04 4775.00 61.66 61.22 0.43 113.64 113.57 0.07 4800.00 60.90 60.40 0.50 114.07 114.03 0.05 4825.00 60.61 60.37 0.24 114.45 114.38 0.07 4850.00 60.87 60.74 0.13 114.76 114.60 0.16 4875.00 61.58 61.61 -0.02 115.01 114.98 0.03 4900.00 62.26 62.15 0.11 115.27 115.12 0.15 4925.00 62.70 62.49 0.21 115.39 115.25 0.14 4950.00 63.02 62.78 0.24 115.50 115.37 0.14 4975.00 63.00 62.79 0.21 115.68 115.56 0.12 5000.00 63.04 62.65 0.39 115.81 115.68 0.14 5025.00 62.95 62.77 0.18 115.85 115.67 0.19 5050.00 62.87 62.74 0.14 115.78 115.61 0.17 5075.00 63.06 62.74 0.31 115.82 115.68 0.13 5100.00 62.80 62.63 0.18 115.89 115.70 0.19 5125.00 62.86 62.49 0.38 115.79 115.53 0.26 5150.00 62.30 61.77 0.53 115.58 115.36 0.23 5175.00 61.46 60.85 0.62 115.41 115.00 0.41 5200.00 61.07 60.96 0.11 115.11 114.92 0.19 5225.00 61.32 61.17 0.14 115.15 114.93 0.22 5250.00 61.37 61.16 0.21 115.21 115.04 0.18 5275.00 61.42 61.20 0.22 115.19 114.96 0.23 5300.00 61.36 61.20 0.16 115.07 114.85 0.22 5325.00 61.08 60.86 0.22 114.86 114.61 0.25 .5350.00 60.78 60.48 0.29 114.64 114.39 0.25 5375.00 60.45 60.23 0.22 114.49 114.36 0.13 5400.00 60.30 60.00 0.30 114.65 114.50 0.15 5425.00 60.12 59.98 0.14 114.69 114.49 0.20 5450.00 59.98 59.84 0.14 114.70 114.52 0.17 5475.00 59.91 59.71 0.20 114.66 114.43 0.22 5500.00 59.75 59.54 0.20 114.51 114.33 0.18 5525.00 59.64 59.46 0.17 114.55 114.39 0.16 5550.00 59.53 59.42 0.12 114.57 114.40 0.16 5575.00 59.49 59.42 0.07 114.52 114.34 0.18 5600.00 59.50 59.37 0.13 114.50 114.36 0.15 5625.00 59.45 59.34 0.11 114.53 114.34 0.19 5650.00 59.44 59.17 0.26 114.39 114.11 0.28 5675.00 59.22 59.09 0.13 114.18 114.02 0.16 5700.00 58.76 58.50 0.26 114.38 114.32 0.07 5725.00 58.25 58.06 0.20 114.49 114.29 0.20 5750.00 57.95 57.82 0.13 114.33 114.12 0.21 SURV-Q 167 (OPS SUR-MA-003) 19~" Nov 03 /Rev 15 Page 5 of 14 AK1107G_562 Survey QC - RGS-CT Specification Sheet 5775.00 57.69 57.28 0.41 114.29 114.20 0.09 5800.00 57.25 57.14 0.10 114.54 114.41 0.12 5825.00 57.17 57.10 0.06 114.54 114.34 0.19 5850.00 57.02 56.76 0.26 114.37 114.12 0.25 5875.00 56.36 56.24 0.12 114.07 113.82 0.25 5900.00 56.53 56.54 -0.02 113.88 113.66 0.22 5925.00 56.94 56.97 -0.03 113.74 113.53 0.21 5950.00 57.35 57.40 -0.05 113.66 113.48 0.17 5975.00 57.72 57.61 0.11 113.55 113.33 0.22 6000.00 57.57 57.31 0.26 113.34 113.14 0.20 6025.00 57.21 57.11 0.10 113.19 113.01 0.17 6050.00 57.27 57.21 0.06 113.17 113.10 0.07 6075.00 56.99 56.81 0.18 113.39 113.28 0.11 6100.00 56.66 56.38 0.27 113.42 113.17 0.25 6125.00 56.27 56.16 0.10 113.17 113.00 0.17 6150.00 56.12 56.04 0.08 113.05 112.92 0.13 6175.00 56.06 55.95 0.11 113.16 113.19 -0.03 6200.00 55.76 55.67 0.09 113.80 113.84 -0.04 6225.00 55.75 55.64 0.10 114.29 114.29 -0.01 6250.00 55:.75 55.74 0.01 114.67 114.57 0.10 6275.00 56.08 56.17 -0.09 _ 114.97 114.95 0.01 6300.00 56.63 56.78 -0.15 115.34 115.28 0.06 6325.00 57.15 57.30 -0.14 115.73 115.70 0.02 6350.00 57.54 57.48 0.06 115.98 115.86 0.12 6375.00 57.67 57.62 0.06 116.13 115.93 0.20 6400.00 57.61 57.53 0.08 116.10 115.91 0.18 6425.00 57.44 57.34 0.10 116.10 115.91 0.19 6450.00. 57.44 57.44 0.00 116.04 115.81 .0.23 6475.00 57.18 56.85 0.33 115.79 115.43 0.36 6500.00 56.62 56.51 0.11 115.35 115.15 0.21 6525.00 56.68 56.74 -0.06 115.22 115.01 0.21 6550.00 57.17 57.35 -0.18 115.19 115.07 0.12 6575.00 57.88 58.10 -0.22 115.33 115.15 0.19 6600.00 58.52 58.65 -0.13 115.31 115.16 0.15 6625.00 58.94 58.97 -0.03 115.38 115.26 0.11 6650.00 59.21 59.32 -0.11 115.46 115.27 0.19 6675.00 59.56 59.61 -0.05 115.51 115.34 0.17 6700.00 59.60 59.55 0.05 115.56 115.39 0.17 6725.00 59.33 59.12 0.21 115.42 115.16 0.26 6750.00 59.08 59.11 -0.03 115.23 115.04 0.19 6775.00 59.08 58.92 0.17 115.05 114.75 0.29 6800.00 58.55 58.41 0.14 114.74 114,55 0.18 6825.00 58.18 58.29 -0.11 114.86 114.72 0.14 6850.00 58.33 57.99 0.34 114.77 114.41 0.35 6875.00 57.65 57.73 -0.08 114.37 114.22 0.15 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 6 of 14 AK1107G_562 Survey QC - RGS-CT Specification Sheet 6900.00 58.02 58.15 -0.13 114.60 114.52 0.08 6925.00 58.53 58.75 -0.22 114.80 114.70 0.10 6950.00 59.16 59.45 -0.29 115.08 115.01 0.07 6975.00 59.94 60.39 -0.46 115.38 115.50 -0.12 7000.00 61.13 61.40 -0.27 116.01 115.82 0.19 7025.00 61.43 61.22 0.20 115.66 114.99 0.67 7050.00 61.14 61.31 -0.17 114.34 113.90 0.45 7075.00 61.67 61.87 -0.19 113.91 113.71 0.20 7100.00 62.11 62.23 -0.12 113.70 113.44 0.26 7125.00 62.62 62.79 -0.17 113.31 112.96 0.35 7150.00 63.00 63.13 -0.12 112.50 112.21 0.29 7175.00 62.99 62.88 0.11 112.18 112.07 0.12 7200.00 62.57 62.56 0.01 112.15 112.07 0.08 7225.00 62.27 62.50 -0.23 112.24. 112.15 0.10 7250.00 62.54 62.57 -0.03 112.33 112.27 0.06 7275.00 61.77 61.50 0.27 112.57 112.52 0.04 7300.00 60.98 61.04 -0.06 112.74 112.64 0.10 7325.00 61.00 61.09 -0.09 112.71 112.58 0.13 7350.00 60.89 60.84 0.06 112.65 112.47 0.18 7375.00 60.69 60.62 0.07 112.56 112.40 0.17 7400.00 60.65 60.84 -0.19 112.50 112.38 0.12 7425.00 60.70 60.79 -0.09 112.51 112.44 0.08 7450.00 60.72 60.84 -0.12 112.70 112.62 0.08 7475.00 60.95 61.15 -0.20 112.89 112.86 0.03 7500.00 61.32 61.52 -0.19 113.13 113.05 0.08 7525.00 _61.57 61.87 -0.30 113.32 113.20. 0.12 7550.00 62.12 62.34 -0.22 113.51 113.44 0.07 7575.00 62.43 62.62 -0.19 113.66 113.55 0.11 7600.00 62.38 62.28 0.10 113.59 113.36 0.23 7625.00 62.06 62.15 -0.08 113.22 112.93 0.29 7650.00 61.61 61.62 -0.01 112.54 112.26 0.28 7675.00 61.34 61.40 -0.06 112.23 112.10 0.12 7700.00 61.30 61.51 -0.21 112.26 112.16 0.10 7725.00 61.51 61.65 -0.14 112.44 112.40 0.04 7750.00 61.85 62.08 -0.22 112.58 112.48 0.10 7775.00 61.98 62.24 -0.26 112.74 112.68 0.06 7800.00 62.33 62.45 -0.12 112.73 112.57 0.16 7825.00 62.44 62.49 -0.05 112.40 112.06 0.34 7850.00 62.34 62.54 -0.19 111.87 111.72 0.15 7875.00 62.73 63.17 -0.44 111.86 111.74 0.12 7900.00 63.27 63.27 -0.00 111.79 111.64 0.15 7925.00 61.94 61.50 0.44 111.53 111.31 0.22 7950.00 60.82 60.87 -0.06 111.23 111.08 0.15 7975.00 60.49 60.56 -0.07 111.15 111.01 0.13 8000.00 60.56 60.72 -0.16 111.10 110.98 0.13 SURV-Q167 (OPS SUR-MA-003) 19n' N ov 03 /Rev 15 Page 7 of 14 AK11O7G_562 Survey QC - RGS-CT Specification Sheet ~~ 8025.00 60.78 61.14 -0.35 111.07 110.98 0.09 8050.00 61.36 61.57 -0.21 111.09 111.02 0.07 8075.00 61.35 61.69 -0.33 111.13 111.07 0.06 8100.00 61.62 61.79 -0.17 111.22 111.11 0.11 8125.00 61.84 62.04 -0.20 111.24 111.16 0.08 8150.00 61.83 61.81 0.02 111.36 111.24 0.12 8175.00 61.67 61.92 -0.24 111.41 111.34 0.08 8200.00 62.09 62.29 -0.20 111.65 111.66 -0.01 8225.00 62.39 62.76 -0.37 112.02 111.97 0.05 8250.00 62.80 62.94 -0.14 112.10 112.01 0.09 8275.00 63.03 63.16 -0.13 112.06 111.80 0.27 8300.00 62.58 62.51 0.08 111.21 110.50 0.70 8325.00 62.19 62.34 -0.15 109.84 109.62 0.23 8350.00 62.27 62.67 -0.40 109.59 109.49 0.1.0 8375.00 62.60 62.58 0.02 109.37 109.14 0.23 8400.00 61.87 61.86 0.01 108.96 108.81 0.14 8425.00 61.80 62.14 -0.34 108.82 108.75 0.07 8450.00 62.06 62.19 -0.13 108.84 108.79 0.06 8475.00 61.89 62.18 -0.28 108.83 108.80 0.03 8500.00 62.11 62.13 -0.02 108.91 108.84 0.07 8525.00 62.13 62.48 -0.35 108.94 108.88 0.06 8550.00 62.52 62.91 -0.39 109.00 108.96 0.03 8575.00 62.40 62.01 0.40 109.28 109.43 -0.15 8600.00 60.55 60.64 -0.10 109.97 110.05 -0.08 8625.00 60.55 60.81 -0.26 110.72 110.91 -0.18 8650.00 61.12 61.58 -0.46 111.27 111.20 0.07 8675.00 -61.60 61.89 -0.29 111.54 111.47 0.08 8700.00 61.39 61.63 -0.23 111.69 111.56 0.12 8725.00 61.64 61.98 -0.34 111.72 111..58 0.14 8750.00 61.65 61.76 -0.11 111.66 111.49 0.16 8775.00 60.62 60.40 0.21 111.63 111.50 0.13 8800.00 59.20 59.39 -0.19 111.58 111.41 0.16 8825.00 59.15 59.28 -0.13 111.60 111.52 0.08 8850.00 59.08 59.29 -0.22 111.74 111.60 0.14 8875.00 58.94 59.20 -0.26 111.73 111.56 0.18 8900.00 59.23 59.58 -0.35 111.67 111.50 0.18 8925.00 59.20 59.46 -0.26 111.52 111.35 0.17 8950.00 59.20 59.59 -0.40 111.40 111.24 0.16 8975.00 59.31 59.50 -0.18 111.23 111.05 0.18 9000.00 59.30 59.66 -0.36 111.15 111.03 0.13 9025.00 59.48 59.91 -0.43 111.17 111.04 0.13 9050.00 59.68 59.71 -0.03 111.12 110.90 0.21 9075.00 59.67 60.05 -0.38 111.01 110.88 0.13 9100.00 59.62 59.92 -0.30 111.03 110.89 0.14 9125.00 59.58 59.73 -0.14 111.01 110.86 0.14 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 8 of 14 AK1107G_562 Survey QC - RGS-CT Specification Sheet 9150.00 59.70 60.10 -0.40 110.91 110.72 0.19 9175.00 59.73 60.14 -0.41 110.73 110.53 0.20 9200.00 60.12 60.27 -0.15 110.59 110.45 0.14 9225.00 60.03 60.38 -0.36 110.56 110.47 0.09 9250.00 60.03 60.30 -0.27 110.70 110.61 0.09 9275.00 60.27 60.67 -0.40 110.86 110.84 0.03 9300.00 60.09 60.44 -0.36 111.31 111.31 0.00 9325.00 60.05 60.29 -0.23 111.69 111.60 0.09 9350.00 60.16 60.54 -0.38 111.80 111.66 0.15 9375.00 60.20 60.36 -0.16 111.84 111.68 0.16 9400.00 60.18 60.55 -0.37 111.82 111.62 0.19 9425.00 60.31 60.69 -0.39 111.61 111.45 0.15 9450.00 60.42 60.48 -0.06 111.55 1].1.39 0.16 9475.00 60.23 60.68 -0.45 111.58 111.41 0.17 9500.00 60.41 60.64 -0.23 111.49 111.26 0.23 9525.00 60.65 61.08 -0.43 111.31 111.13 0.18 9550.00 60.85 61.33 -0.48 111.14 110.96 0.17 9575.00 61.22 61.36 -0.14 111.07 110.86 0.20 9600.00 61.17 61.60 -0.43 110.88 110.68 0.20 9625.00 61.34 61.65 -0.31 110.76 110.61 0.15 9650.00 61.59 61.95 -0.37 110.62 110.42 0.20 9675.00 61.71 62.15 -0.45 110.40 1.10.23 0.17 9700.00 62.03 62.16 -0.13 110.33 110.20 0.13 9725.00 62.12 62.59 -0.47 110.36 110.22 0.14 9750.00 62.16 62.51 -0.35 110.36 110.26 0.09 9775.00 62.33 62.73 -0.40 110.38 110.23 0.14 9800.00 62.33 62.50 -0.17 110.12 109.82 0.29 9825.00 62.36 62.58 -0.22 109.83 109.68 0.16 9850.00 62.27 62.45 -0.17 109.82 109.65 0.18 9875.00 62.44 62.83 -0.39 109.73 109.53 0.20 9900.00 62.37 62.58 -0.21 109.55 109.31 0.24 9925.00 62.42 62.83 -0.41 109.35 109.14 0.21- 9950.00 62.60 62.87 -0.27 109.10 108.89 0.21 9975.00 62.73 63.02 -0.28 108..85 108.64 0.22 10000.00 62.92 63.28 -0.37 108.68 108.50 0.18 10025.00 62.85 63.11 -0.26 108.52 108.31 0.22 10050.00 63.05 63.40 -0.35 108.35 108.16 0.19 10075.00 63.10 63.38 -0.29 108.13 107.92 0.21 10100.00 63.13 63.26 -0.13 107.95 107.73 0.22 10125.00 63.07 63.37 -0.30 107.72 107.52 0.20 10150.00 63.08 63.43 -0.35 107.50 107.34 0.16 10175.00 63.24 63.57 -0.32 107.34 107.14 0.21 10200.00 63.27 63.65 -0.38 107.16 107.02 0.14 10225.00 63.61 63.97 -0.36 107.09 106.95 0.14 10250.00 63.65 64.13 -0.48 107.02 106.92 0.10 SURV-Q 167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 9 of 14 AK1107G_562 Survey QC - RGS-CT Specification Sheet .L~ 10275.00 63.87 64.33 -0.46 106.98 106.90 0.08 10300.00 63.90 63.63 0.27 107.14 107.26 -0.12 10325.00 62.87 62.99 -0.13 107.53 107.46 0.07 10350.00 62.76 63.07 -0.30 107.56 107.46 0.10 10375.00 62.84 63.44 -0.60 107.70 107.95 -0.25 10400.00 62.99 63.05 -0.06 108.63 109.01 -0.39 10425.00 62.56 62.78 -0.22 109.42 109.43 -0.01 10450.00 62.60 63.21 -0.61 109.62 109.50 0.12 10475.00 63.14 63.56 -0.43 109.76 109.88 -0.12 10500.00 63.45 63.95 -0.50 110.15 110.05 0.10 10525.00 63.51 63.96 -0.45 110.21 110.04 0.17 10550.00 63.83 64.11 -0.28 110.16 109.90 0.25 10575.00 63.81 64.27 -0.46 110.04 109.78 0.26 10600.00 64.13 64.60 -0.47 109.91 109.60 0.31 10625.00 64.39 65.03 -0.64 109.68 109.42 0.26 10650.00 64.68 65.16 -0.49 109.50 109.26 0.24 10675.00 64.91 65.44 -0.53 109.36 109.09 0.28 10700.00 65.15 65.55 -0.40 109.18 108.88 0.30 10725.00 65.32 65.63 -0.31 108.96 108.67 0.29 10750.00 65.33 65.75 -0.43 108.79 108.75 0.04 10775.00 65.16 65.20 -0.04 108.97 108.98 -0.01 10800.00 64.74 64.89 -0.15 109.17 109.04 0.13 10825.00 64.50 64.89 -0.39 109.20 109.00 0.20 10850.00 64.57 64.63 -0.07 109.13 108.93 0.20 10875.00 64.23 64.37 -0.14 109.06 108.85 0.20 10900.00 63.79 63.68 0.11 108.96 108.64 0.31 10925.00 63.35 63.56 -0.21 108.70 108.46 0.24 10950.00 63.25 63.78 -0.53 108.64 108.95 -0.31 10975.00 63.29 63.37 -0.08 109.46 110.23 -0.77 11000.00 62.99 63.67 -0.68 110.54 110.56 -0.02 11025.00 63.29 63.69 -0.40 110.74 110.62 0.13 11050.00 63.20 63.32 -0.12 110.92 111.16 -0.24 11075.00 62.76 62.77 -0.02 111.53 111.71 -0.17 11100.00 62.36 62.39 -0.04 112.05 111.97 0.08 11125.00 62.00 62.67 -0.67 112.20 111.88 0.31 11150.00 62.31 62.48 -0.17 112.06 111.75 0.30 11175.00 62.17 62.69 -0.52 111.89 111.57 0.33 11200.00 62.51 62.97 -0.46 111.80 111.49 0.31 11225.00 62.50 62.86 -0.36 111.58 111.28 0.30 11250.00 62.85 63.28 -0.44 111.41 111.13 0.28 11275.00 63.07 63.44 -0.36 111.25 110.98 0.27 11300.00 63.11 63.61 -0.50 111.17 110.91 0.26 11325.00 63.65 64.07 -0.42 111.11 110.94 0.16 11350.00 63.08 63.12 -0.04 111.41 111.36 0.05 11375.00 62.25 62.20 0.05 111.76 111.56 0.20 SURV-Q167 (OPS SUR-MA-003) 19~" Nov 03 /Rev 1S Page 10 of 14 AK1107G_562 Survey QC - RGS-CT Specification Sheet ~' 11400.00 61.58 61.81 -0.23 111.89 111.66 0.23 11425.00 61.20 61.77 -0.57 111.90 111.58 0.32 11450.00 61.45 61.86 -0.42 111.68 111.36 0.32 11475.00 61.45 61.82 -0.37 111.47 111.19 0.27 11500.00 61.49 61.87 -0.38 111.29 111.01 0.28 11525.00 61.51 61.83 -0.32 111.17 110.90 0.27 11550.00 61.27 61.59 -0.32 111.08 110.79 0.28 11575.00 61.36 61.84 -0.48 110.85 110.52 0.33 11600.00 61.25 61.72 -0.48 110.58 110.35 0.22 11625.00 61.38 61.66 -0.28 110.46 110.19 0.28 11650.00 61.25 61.58 -0.32 110.19 109.90 0.30 11675.00 61.38 61.72 -0.34 109.90 109.64 0.26 11700.00 61.10 61.44 -0.34 109.61 109.35 0.27 11725.00 60.95 61.54 -0.59 109.43 109.20 0.24 11750.00 61.28 61.65 -0.37 109.22 109.01 0.20 11775.00 61.30 61.69 -0.39 109.09 108.90 0.19 11800.00 61.16 61.49 -0.32 108.99 108.91 0.08 11825.00 60.98 61.51 -0.53 109.44 109.63 -0.19 11850.00 61.09 61.38 -0.29 110.50 110.55 -0.05 11875.00 61.12 61.38 -0.26 .110.95 110.77 0.18 11900.00 61.19 61.62 -0.42 111.09 111.06 0.03 11925.00 61.11 61.71 -0.60 112.00 112.25 -0.25 11950.00 61.46 61.85 -0.38 113.19 113.11 0.08 11975.00 61.51 61.92 -0.41 113.51 113.20 0.31 12000.00 61.51 61.69 -0.19 113.34 112.97 0.37 12025.00 61.43 61.75 -0.32 113.13 112.75 0.37 12050.00 61.30 61.65 -0.35 112.93 112.63 0.31 12075.00 61.31 61.63 -0.32 112.77 112.42 0.35 12100.00 61.07 61.50 -0.43 112.57 112.33 0.25 12125.00 61.09 61.36 -0.26 112.60 112.29 0.31 12150.00 61.05 61.37 -0.32 112.49 112.21 0.28. 12175.00 60.89 61.28 -0.39 112.37 112.06 0.31 12200.00 61.03 61.55 -0.52 112.31 112.01 0.30 12225.00 60.77 61.13 -0.37 112.20 111.88 0.31 12250.00 60.79 61.27 -0.49 112.09 111.74 0.35 12275.00 60.87 61.06 -0.19 111.92 111.62 0.30 12300.00 60.88 61.40 -0.52 111.83 111.54 0.29 12325.00 60.78 61.25 -0.47 111.65 111.34 0.31 12350.00 60.95 61.24 -0.29 111.51 111.26 0.25 12375.00 60.89 61.27 -0.38 111.38 111.06 0.32 12400.00 60.81 61.15 -0.33 111.24 110.97 0.27 12425.00 60.80 61.29 -0.49 111.11 110.87 0.24 12450.00 60.65 61.14 -0.49 110.99 110.70 0.29 12475.00 60.74 61.06 -0.32 110.75 110.52 0.23 12500.00 60.69 61.13 -0.43 110.66 110.40 0.26 SURV-Q167 (OPS SUR-MA-003) 19th Nov 03 /Rev 15 Page 11 of 14 AK1107G_562 Survey QC - RGS-CT Specification Sheet '#` ~~ 12525.00 60.71 61.01 -0.30 110.57 110.34 0.23 12550.00 60.76 61.24 -0.48 110.37 110.10 0.27 12575.00 60.79 61.30 -0.51 110.28 110.07 0.21 12600.00 60.99 61.18 -0.19 110.20 109.92 0.28 12625.00 60.86 61.41 -0.54 110.16 110.01 0.15 12650.00 60.77 61.05 -0.28 110.28 110.04 0.24 12675.00 60.68 61.14 -0.46 109.88 109.68 0.19 12700.00 60.51 60.98 -0.47 109.82 109.62 0.20 12725.00 60.65 60.82 -0.18 109.67 109.45 0.22 12750.00 60.50 60.89 -0.39 109.61 109.44 0.17 12775.00 60.40 60.71 -0.31 109.54 109.37 0.17 12800.00 60.31 60.72 -0.40 109.47 109.24 0.23 12825.00 60.13 60.54 -0.41 109.29 109.14 0.15 12850.00 60.22 60.44 -0.21 109.21 109.02 0.19 12875.00 60.16 60.57 -0.41 108.95 108.70 0.25 12900.00 60.06 60.48 -0.43 108.70 108.50 0.20 12925.00 60.22 60.62 -0.40 108.47 108.32 0.14 12950.00 60.16 60.53 -0.37 108.34 108.11 0.23 12975.00 60.12 60.28 -0.16 108.08 107.95 0.13 13000.00 59.92 60.34 -0.42 107.92 107.75 0.17 13025.00 59.76 60.18 -0.41 107.62 107.51 0.12 13050.00 59.74 60.05 -0.31 107.72 107.75 -0.03 13075.00 59.17 59.50 -0.33 108.54 109.00 -0.46 13100.00 58.95 59.23 -0.28 109.75 109.67 0.08 13125.00 59.01 59.46 -0.45 109.82 109.63 0.19 13150.00 58.97 59.28 -0.31 109.94 110.22 -0.28 13175.00 58.68 58.88 -0.20 111.45 111.76 -0.31 13200.00 58.30 58.75 -0.45 112.54 112.34 0.20 13225.00 58.41 58.63 -0.22 112.41 112.07 0.34 13250.00 58.15 58.31 -0.16 112.69 112.76 -0.07 13275.00 57.42 57.61 -0.19 113.37 113.33 0.04 13300.00 57.17 57.43 -0.26 113.92 113.73 0.19 13325.00 56.95 57.29 -0.34 113.90 113.37 0.53 13350.00 56.81 57.05 -0.24 113.46 113.14 0.31 13375.00 56.77 57.15 -0.39 113.26 112.86 0.40 13400.00 56.45 56.82 -0.37 113.07 112.68 0.39 13425.00 56.56 56.85 -0.29 112.74 112.43 0.31 13450.00 56.28 56.66 -0.38 112.59 112.18 0.41 13475.00 56.17 56.36 -0.18 112.28 111.97 0.31 13500.00 56.08 56.50 -0.43 112.26 111.95 0.30 13525.00 55.97 56.42 -0.45 112.09 111.76 0.33 13550.00 56.16 56.48 -0.33 111.86 111.63 0.23 13575.00 56.06 56.40 -0.34 111.77 111.46 0.31 13600.00 55.82 56.06 -0.24 111.46 111.16 0.30 13625.00 55.86 56.22 -0.35 111.38 111.08 0.30 SURV-Q167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 12 of 14 AK1107G_562 Survey QC - RGS-CT Specification Sheet ~.. 13650.00 55.56 55.96 -0.41 110.95 110.68 0.27 13675.00 55.62 55.89 -0.27 110.96 110.75 0.22 13700.00 55.33 55.70 -0.37 110.71 110.40 0.31 13725.00 55.22 55.50 -0.27 110.54 110.30 0.24 13750.00 55.05 55.46 -0.40 110.31 110.08 0.23 13775.00 55.03 55.30 -0.28 110.25 109.97 0.28 13800.00 54.81 55.14 -0.34 110.07 109.78 0.30 13825.00 54.88 55.22 -0.34 109.77 109.57 0.20 13850.00 54.67 55.02 -0.35 109.76 109.43 0.33 13875.00 54.52 54.65 -0.14 109.15 108.88 0.28 13900.00 54.39 54.83 -0.44 108.82 108.64 0.18 13925.00 54.54 55.11 -0.57 109.07 109.37 -0.29 13950.00 54.97 55.32 -0.35 110.69 110.81 -0.12 13975.00 54.81 55.21 -0.40 111.34 111.11 0.23 14000.00 54.95 55.20 -0.25 111.41 111.13 0.28 14025.00 54.75 55.13 -0.38 111.06 110.66 0.40 14050.00 54.59 54.95 -0.36 110.61 110.30 0.32 14075.00 54.57 54.78 -0.21 110.32 110.01 0.31 14100.00 54.33 54.74 -0.41 110.18 109.94 0.23 14125.00 54.48 54.71 -0.23 110.15 109.93 0.23 14150.00 54.50 54.99 -0.49 110.16 110.05 0.11 14175.00 54.54 54.83 -0.29 110.35 110.04 0.31- 14200.00 54.66 55.02 -0.36 110.05 109.83 0.22 14225.00 54.63 55.06 -0.43 110.12 109.90 0.22 14250.00 54.61 54.89 -0.28 109.89 109.66 0.23 14275.00 54.71 55.14 -0.43 109.92 109.77 0.15 14300.00 54.69 55.04 -0.35 109.90 109.67 0.23 14325.00 54.95 55.24 -0.29 110.04 109.92 0.12 14350.00 54.90 55.27 -0.37 110.06 109.71 0.35 14375.00 54.90 55.23 -0.33 109.51 109.41 0.10 14400.00 54.66 54.55 0.11 110.13 110.00 0.13 14425.00 53.21 53.03 0.18 109.99 109.77 0.22 14450.00 51.84 51.95 -0.11 110.40 110.36 0.04 14475.00 51.85 52.18 -0.34 110.66 110.34 0.33 14500.00 51.79 52.11 -0.32 110.31 109.92 0.39 14525.00 51.85 52.26 -0.41 110.20 110.22 -0.02 14550.00 51.87 52.18 -0.31 110.52 110.13 0.38 14575.00 51.81 52.00 -0.19 109.92 109.54 0.38 14600.00 51.59 51.82 -0.23 110.01 109.96 0.05 14625.00 51.54 51.70 -0.16 110.14 109.69 0.45 14650.00 51.43 51.76 -0.33 109.65 109.40 0.25 14675.00 51.37 51.66 -0.30 109.57 109.31 0.26 14700.00 51.44 51.65 -0.21 109.43 109.21 0.22 14725.00 51.50 51.81 -0.30 109.30 109.08 0.22 14750.00 51.72 51.76 -0.04 109.36 109.17 0.19 SURV-Q 167 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 13 of 14 AK1107G_562 Survey QC - RGS-CT Specification Sheet ~..® 14775.00 51.42 51.86 -0.45 109.48 109.18 0.30 14800.00 51.79 52.02 -0.23 109.19 108.85 0.35 14825.00 51.78 52.03 -0.25 108.94 108.66 0.28 14850.00 52.06 52.20 -0.14 108.65 108.46 0.19 14875.00 52.11 52.42 -0.31 108.86 108.61 0.25 14900.00 51.88 52.03 -0.15 108.63 108.30 0.34 14925.00 52.01 52.09 -0.08 108.24 108.06 0.18 14950.00 51.74 51.90 -0.16 107.98 107.95 0.02 14975.00 51.90 52.01 -0.11 108.08 108.08 0.00 15000.00 51.74 51.75 -0.01 108.06 107.93 0.13 15025.00 51.59 51.69. -0.10 107.90 107.87 0.02 15050.00 51.52 51.53 -0.01 107.83 107.79 0.04 15075.00 51.36 51.46 -0.09 107.88 107.87 0.01 15100.00 51.49 51.62 -0:13 107.91 107.78 0.13 15125.00 51.79 51.83 -0.04 107.77 107.75 0.02 15150.00 52.10 52.18 -0.08 107.81 107.75 0.07 15175.00 52.38 52.50 -0.11 107.78 107.68 0.10 15200.00 52.71 52.63 0.08 107.80 107.67 0.13 15225.00 52.90 52.89 0.01 107.80 107.67 0.13 15250.00 53.10 53.00 0.10 107.78 107.61 0.17 15266.68 53.00 53.00 0.00 107.60 107.60 0.00 Average -0.0619 0.1619 Standard Deviation 0.2187 0.1455 Tolerance for both the Average and the Standard Deviation Casing 0.3~ Drill i e 0.3~ Casing 0.50 Drill i e 0.75 ii n.una uvn anu r~uniuui II IlC1~./VIO LCU w aanie ucNu~~ as mown. SURV-Qi67 (OPS SUR-MA-003) 19`" Nov 03 /Rev 15 Page 14 of 14 AK1107G_562 Survey QC - RGS-CT Analysis Sheet SURVEY QUALITY CONTROL -DATA ANALYSIS REFERENCE SY~TFMS Grid S stem Grid Correction 0.00 Azimuth reference: Grid /True North TRUE NORTH Vertical reference: RKB/MS Other RKB If other ive details TTE nN Here De th 0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00 Northin s 0.00 Eastin s 0.00 Latitude 70.4003 Az. Ref: Grid/True Grid Corrected Y N? Descri tion CALIBRATYON Tool Number 3089 Calibration Date 26 Se 2007 OPERATING TEMPERATURE Calibration ran a From 49.45 To 120.32 Gyro operating range From 52.82 To 90.45 Spec' -Within calibration range - FiEi D Rnl 1 TFST (r)niv valiA nn fivcli cf~~~.-t~~roo 1A/hc ~.* .. o~F.lo ~ ~~* r..ll four .hf~ ..,,..F,.-......,.~ ..a._- - Cal value Pre 'ob offset ost ~ob offset Abs dif.cal. ost Abs dif. re. ost Sec' Accel Scale 0.000000 0.000000 N A Cal/Post - 0.00015 Mass Unbalance 0.00 0.00 N/A Pre/Post - 0.4°/hr INITTeLTSeTTnN De th A rox 1198.85 No of stns 7 Sec' -Min No. - 6 Azimuth Mean 99.09 Std deviation 0.12 Sec' - Azi SD 0.2° Inclination Mean 13.97 Std deviation 0.00 Sec' -Inc SD 0.1° Earth Horizontal Rate Mean Abs meas-theor 0.06 Std deviation 0.02 Sec' -See 167 DRIFT TUNE Residual x ro bias Mean 0.001 Std dev' 0.003 Sec's -Mean and SD - 0.333° hr Residual ro bias Mean 0.002 Std dev' 0.001 Sec's -Mean and SD - 0.333~/hr TOOLFACE RATE Maximum toolface rate 12.22 Sec' - 400/sec IN/nllT CnMPeRTRnN le77' N/e iF iN(" dir.°\ Inclination Difference Mean -0.06 Std dev' 0.21 Sec's -Casin 0.3° Drill i e 0.3° Azimuth Difference Mean 0.16 Std dev' 0.15 Sec's -Casin 0.5° Drill i e 0.75° Lateral Diver ence 1000 3.10 Sec - 5.0 1000 Vertical Diver ence/1000 0.87 Sec' - 2.0/1000 nFDTH fnNTDnI Wireline Com an Schlumber er Line e 7 32 Encoder SF Schlumber er Max De th TD 15250 CCL Corrected Yes Zero De th Ri u +29ft to RKB Rezero De th 8 feet Given u 'oint de th 14770.68 Measured P) 14755.00 Strech cor. At TD divided b TD 1000 .33 Sec' - 1.5 1000 Dif. Between ri u and rezero de the divided b TD 1000 1.9 Sec' - 2.0 1000 Dif. Between iven and meas de th divided b meas 1000 .02 Sec' - 2.0 1000 SURV-Q165 (OPS SUR-MA-01.0) 22n° Jan 2004 /Revision 20 Page 1 of 1 AK3107G_562 Survey QC - RGS-CT Acceptance Sheet ...®v FIELD 4iVD SIIRVFV TIUCnID b7 Krrnw~ Operator BP Exploration (Alaska) Inc. Field /Platform Well Number PMU WOA PAD P2 WELL 45A Survey section From 1196.00 ft. to 15252.00 ft. Date 1 J 21 / 2008 Gyrodata Job No AK1107G_562 Gyrodata Surveyors JAMES BUTLER Job Objective High Accuracy Gyro Survey SURVEY PERFORMeNf F In Spec' QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurve with backu tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurve with backu tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investi ate and comment if effects are ne li ible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurve with backu tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other C arameters Depth control within specification Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q366 (OPS SUR-MA-003) 13`" Nov 03 /Revision 12 Page 1 of 1 AK3307G_562 Kt:.vL.-1 V L-U ~ I - ~~ ALAS A all AND ~~;~g~sAi~:~OAlCDM~I~~G 3 1 2007 REPORT OF SUNDRY WELL OPijfiA¡tiQNS Cons. Commission 1. Operations Abandon 0 Repair Well 0 Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Opera!. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (It): Plug Perforations 0 Perforate New Pool 0 Perforate 0 4. Current Well Class: Development ¡;; Stratigraphic Stimulate [J Anchora~her 0 ACID TREATMENT_ Waiver 0 Time Extension 0 Re-enter Suspended Well 0 5. Permit to Drill Number: Exploratory Service 197-1440 -- 6. API Number: 50-029-22769-01-00 - 9. Well Name and Number: 46.2 KB P2-45A , ADLO-034627 11. Present Well Condition Summary: 10. Field/Pool (s): PRUDHOE BAY Field/ PT MCINTYRE OIL Pool - 8. Property Designation: Total Depth measured true vertical 15417 ' feet 9196.33· feet Plugs (measured) Junk (measured) None None Effective Depth measured 15320 feet true vertical 9139 feet Casing Length Size MD TVD Burst Collapse Surface 6956 9-5/8" 40# L-80 34 - 6990 34 - 4950.74 5750 3090 Production 14648 7" 26# L -80 31 - 14679 31 - 8743.44 7240 5410 Production 727 7" 29# 13CR80 14679 - 15406 8743.44 - 9189.83 8160 7020 Conductor 75 20" 133# H-40 35 - 110 35 - 110 3060 1500 Perforation depth: Measured depth: 15093 -15183 True Vertical depth: 9000.33 - 9056.03 15200 - 15225 9066 - 9082 _SCANNED SEP 112007 - - Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13CR80 29' - 14396' Packers and SSSV (type and measured depth) 4-1/2" Baker S-3 Perm Packer o o o 14891 o o o 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations Oil-Bbl 1 o Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure 359 8729 0 o 0 0 Tubing pressure 735 485 13. 15. Well Class after proposed work: Exploratory Development ¡;; 16. Well Status alter proposed work: Oil ¡;; Gas r WAG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Service r x GINJ WINJ WDSPl Tsundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Form 10-404 Revised 04/2006 /l / ~ Ú/L/ o RIG I ~I A I RBDMS BFL SEP 1 0 2007 ~l~ Title Data Management Engineer Printed Name Gary Prebl~ Signature ,.ø Phone 564-4944 Date 8/29/2007 Submit Original Only .. . . P2-45A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 8/21/2007 CTU # 9 w/1.75" CT. {Scale Blaster & Acid}, MIRU, MU & RIH BHA# 1 (Baker MHA & SLB Jet blaster tools). Jet blast interval from 14839'-14889' @ 0.9-1.4 bpm/1-2 fpm. Limited by coil and WHP. Bleed backside. All liquid. Displace 35 bbls 15% HCL to nozzle. Jet interval 14839'-14889' w/9 bbls acid @ 0.8 bpm/4 fpm. RIH to bottom. Continued on 08/22/07 WSR. 8/22/2007 Continued from 08/21/07 WSR. Jet liner/perfs from 15255'- to TT @ 14937' w/26 bbls of 15% HCL. Saw WHP break back w/ acid. Park CT @ safety/soak acid. Pump overflush and jet GLM #8 w/ KCL @ 2 fpm/1.5 bpm. Continue jetting tbg/liner/perfs w/ KCL @ 1.6 bpm to 15254'. Jet back up @ 1.4 bpm/28 fpm w/ KCL. Make slow repeat pass across GLM #8 from 14839'-14839' @ 1.4 bpm/3 fpm. Pump total 314 bbls overflush. Freeze protect wellbore to 2000' w/ water/meth. RDMO. Job complete. FLUIDS PUMPED BBLS 207 KCL 106 1% KCL W/0.6% SAFE LUBE 16 METH/WATER 329 TOTAL , STATE OF ALASKA ) ALA~ .\ OIL AND GAS CONSERVATION COMrvll~iSION REPORT OF SUNDRY WELL OPERATIONS D D o "~ 1. Operations Abandon D Repair Well D Performed: Alter Casing D Pull Tubing D Change Approved Program D Operat. Shutdown D 2. Operator BP Exploration (Alaska), Inc. Name: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 46.2 KB 8. Property Designation: ADl-034627 11. Present Well Condition Summary: Total Depth measured 15417 true vertical 9196.33 Effective Depth measured 15320 true vertical 9138.84 Casing Conductor Surface Production Production length 75 6956 14648 727 Size 20" 133# H-40 9-5/8" 40# l-80 7" 26# l-80 7" 29# 13CR80 Perforation depth: Measured depth: 15093 - 15183 True Vertical depth: 9000.33 - 9056.03 Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of logs and Surveys Run Daily Report of Well Operations Oil-Bbl o 491 x Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 000 917 10932 0 15. Well Class after croposed work: Exploratory r Development P' 16. Well Status after proposed work: Oil P" Gas r WAG r Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development [;?" Stratigraphic [1 feet feet feet feet MD 35 - 11 0 34 - 6990 31 - 14679 14679 - 15406 15100 -15140 9004.68 - 9029.51 4-1/2" 12.6# 4-1/2" Baker S-3 Packer 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sharmaine Vestal Printed Name Sharmaine Vestal Signat~ -zlb Form 10-404 Revised 04/2004 RECEIVED OCT 1 2 Z005 Alaska Oil & Gas Cons. Commission Stimulate D Other D Anchorage Waiver D Time Extension D Re-en~er Suspended Well D 5. Permit to Drill Number: Exploratory C¡ 197-1440 Service 6. API Number: 50-029-22769-01-00 9. Well Name and Number: P2-45A 10. Field/Pool(s): PRUDHOE BAY Field/ PT MCINTYRE Oil Pool Plugs (measured) Junk (measured) None None TVD 35 - 110 34 - 4950.74 31 - 8743.44 8743.44 - 9189.83 Collapse 1500 3090 5410 7020 Burst 3060 5750 7240 8160 15200- 15225 9066.43 - 9081.66 13CR80 29 - 14937 14891 SCANNE[i NO\,r (» D 2005 RBDMS BFL 0 CT 1 ~ 2005 Tubing pressure o 285 Service r GINJ r WDSPL r WINJ r Sundry Number or N/A if C.O. Exempt: N/A Title Data Mgmt Engr Date 10/10/2005 Phone 564-4424 Submit Original Only ",' ) ) ,,:4 P2-45A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTIVITYDATE SUMMARY 9/15/2005 PERFORATED FROM 15100' - 15140' USING 2x 20' 2-7/8" GUNS WITH 2906 POWERJET HMX 6SPF, 60 DEGREE PHASING. 242 SHOTS FIRED. API DATA: PEN = 27.7", EH = 0.36", WT = 15 GM. WELL LEFT SHUT IN, INFORMED DSO READY TO POP. FLUIDS PUMPED BBLS 1 Diesel 1 TOTAL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X MILL SCALE ! ADD-PERFS Pu, tubing _ Alter casing _ Repair well _ Other_X MILL SCALE 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface 398' FNL, 3984' FEL, Sec. 14, T12N, R14E, UM At top of productive interval 4302' FNL, 3524' FEL, Sec. 18, T12N, R15E, UM At effective depth 4364' FNL, 3358' FEL, Sec. 18, T12N, R15E, UM At total depth 4386' FNL, 3283' FEL, Sec. 18, T12N, R15E, UM 5. Type of Well: Development _X Explorato~__ Stratigraphic__ Service_ (asp's 681542, 5998185) (asp's 692191, 5994546) (asp's 692359, 5994489) (asp's 692434, 5994469) 12. Present well condition summary Total depth: measured true vertical 15417 feet Plugs (measured) 9196 feet Effective depth: measured true vertical Casing Length Conductor 110' Surface 6958' Production 15375' 15321 feet Junk (measured) 9139 feet Size Cemented 20" 260 sx Arctic Set (Aprox) 1761 sx Coldset III, 644 9-5/8" sx Class 'G' 7" 335 sx Class 'G' 6. Datum elevation (DF or KB feet) RKB 45 feet 7. Unit or Property name Point Mclntyre Unit 8. Well number P2-45A 9. Permitnumber/approvalnumber ~t 197-144 10. APlnumber 50-029-22769-01 11. Field / Pool Point Mclntyre Oil Pool Measured Depth True VerticalDe~h 145' 145' 6992' 4952' 15406' 9190' Perforation depth: Tubing (size, grade, and measured depth) Packers & SSSV (type & measured depth) measured Open Perfs 15093' - 15183' true vertical Open Perfs 9000' - 9055' 4-1/2", 12.6#, 13-CR80 Tubing @ 14937'. 7" x 4-1/2" Baker SABL-3 Packer @ 14891'. 4-1/2" Camco BAL-O SSSV Landing Nipple @ 2200'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Prior to well operation 01/27/2003 Subsequent to operation 02/23/2003 OiI-Bbl 93 93 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ Representative Daily Averaqe Production or Injection Data Gas-Mcf Water-Bbl 167 3318 179 3062 I16. Status of well classification as: Suspended __ Oil __X Gas __ 17. I hereby certify that the foregoing is true and correct to the best of my k~'~wledge. ,,~,,~. ~m~2,~ ,~~~ Title: Technical Assistant DeWar/ne R. Schnorr Casing Pressure Service Form 10-404 Rev 06/15/88 Tubing Pressure 760 781 Date February 24, 2003 ~:~ar~J~jJ~e'~ay~ I::{~r 5~-5174 SUBMIT IN DUPLICATE 01/25/2003 01/26/2003 01/28/2003 01/29/2003 01/30/2003 01/31/2003 02/01/2003 02/19/2003 02/20/2003 01/25/03 01/26/03 01/28/03 P2-45A - DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS PERFORATING: PERFORATING: TESTEVENT --- MILL; SCALE REMOVAL MILL; SCALE REMOVAL BOPD: 95, BWPD: 3,075, MCFPD: 2,279, AL Rate: 2,089 PERFORATING: PERFORATING: PERFORATING: PERFORATING: PERFORATING: PERFORATING: PERFORATING PERFORATING DRIFT/TAG DRIFT/TAG MILL; PERFORATING JEWELRY LOG--DEPTH CONTROL; PERFORATING EVENT SUMMARY MIRU CTU#9. RIH WITH 3.625" 3 BLADE CARBIDE MILL. CONTINUED TO RIH WITH WFD 3.625" 3 BLADE CARBIDE MILL. SPIN MILL FROM 10600'-14900'. RIH PUMPING MINIMUM RATE IN LINER, TAG 15300'. NO SCALE OBSTRUCTIONS SEEN. RECIPROCATE CT IN LINER WHILE MILLING @ 2.2 BPM - NO MOTOR WORK, CHASE WITH 2# BIO PILLS SWEEPS OFF BOTTOM. BACKREAMED OUT OF LINER AND TUBING HOLE. RDMO. <<< WELL LEFT FLOWING, DSO NOTIFIED OF STATUS >>> TESTEVENT --- BOPD: 95, BWPD: 3,075, MCFPD: 2,279, AL Rate: 2,089 01/29/03 01/30/03 ATTEMPT PERF WITH 3 3/8" GUNS, UNABLE TO DRIFT PAST 8300', SHUT IN WELL TO RIH, RELOAD GUNS FOR 2 7/8", RETURN IN MORNING TO PERF. <<< DSO TO POP WELL >>> ATTEMPT PERFORATING WITH 2 7/8" GUN, TOOLS SET DOWN @10630', PUH & RIH, CONTINUE DOWN 80 FPM. TAGGED BOTTOM AT 15026', UNABLE TO REACH PERF DEPTH WITH 2 7/8" GUN. TRIED VARIOUS SPEEDS/FLOWED WELL, POOH FOR SLICK LINE DIAGNOSTICS. <<< DSO TO POP WELL >>> 01/31/03 02/01/03 <<< WELL FLOWING ON ARRIVAL >>> RUNNING 2-7/8" x 10' DUMMY GUN, SETS DOWN SEVERAL PLACES 11113' WLM TO 11251' WLM. ATTEMPTING TO FREE UP TIGHT SPOTS. DRIFT W/2-7/8" x 10' DUMMY GUN TO 15009' CORRECTED DEPTH. (NO RETURNS IN SAMPLE BAILER) <<< HAD TO WORK DRIFT FROM 11,000' SLM TO 15,004' KEPT SETTING DOWN ON OBSTRUCTIONS - - WAS ABLE TO FREE UP >>> <<< GIVE WELL BACK TO DSO TO POP >>> SCANNED MAR 1 0 2003 Page I P2-45A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 01/25/2003 02/19/03 PERFORATING: MILL; SCALE REMOVAL MIRU UNIT #8, RIH WITH BAKER 3.70" MILL & 2 7/8" MOTOR. SEE LIGHT MOTOR WORK INTERMITTENTLY STARTING @ 9236' TO 15200'. CONTINUE RIH PUMPING MINIMUM RATE TO 15304'. DID NOT TAG UP. PULL BACK UP TO 15250' AND PUMPED 10 BBLS FLO-PRO SWEEP. CHASED OUT AT 80%. FREEZE PROTECT COIL. 02/20/03 MONITOR WEATHER. RIH WITH PDS MEMORY LOGGING TOOLS. AT SURFACE WITH GOOD DATA, TIE INTO JEWELRY LOG DATED 09/22/1997, CORRECTION IS (-1'). RIH WITH 25' x 3-3/8" 3406PJ, 6 SPF, 0.45" ENT HOLE, 38.6" PEN, 60 DEGREE PHASING, & RANDOM ORIENTATION. TIE INTO CORRECTED FLAG. PERFORATED 15200'- 15225'. POOH. ALL SHOTS FIRED. RDMO. NOTIFY DSO TO POP WELL. FLUIDS PUMPED BBLS 3 DIESEL FOR PRESSURE TESTING SURFACE PRESSURE CONTROL EQUIP 167 60/40 METHANOL WATER 523 DOUBLE SLICK 1% KCL WATER 690 EXTRA SLICK 1% KCL WATER 12 2# BIOZAN 35 FLO-PRO 1430 TOTAL RE-PERF O2/2O/2O03 THE FOLLOWING INTERVAL WAS PERFORATED USING THE 3-3/8" 3406 P J, 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 15200' -15225' SCANNED MAR 1 0 2003 Page 2 ALASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR '333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 July 18, 2001 Paul Benetti, CEO GRI, Inc. 89-91 Burswood Road Victoria Park WA 6100 Australia Certified Mail No. 7099 3400 0004 8967 1449 Frederick H. Boness, Registered Agent Preston, Gates, and Ellis, LLP 420 L Street, Suite 400 Anchorage, Alaska 99501 Certified Mail No. 7099 3400 0004 8967 1418 ~~NED MAY 2 9 2002 Gentlemen: In a letter from the Commission dated April 2, 2001, GRI, Inc. ("GRI") was advised that the Houston #1, #2, #3, ~and #22 wells, of which GRI, Inc., is operator, appear to be past due for plugging. GRI was asked to inform the Commission as to its plans for expeditiously meeting its well abandonment obligations. The Commission has not received any response to this inquiry. In accordance with 20 AAC 25.535(b), you are notified that the Alaska Oil and Gas Conservation Commission proposes to take enforcement action against GRI, Inc. The nature of the apparent violation(s) or noncompliance is GRI's failure to comply with 20 AAC 25.105(a), 20 AAC 25.112, and 20 AAC 25.170, concerning abandonment of the Houston # 1, #2, #3, #4, and #22 wells and concerning location clearance for those wells. The reasons why the Commission considers violation(s) or noncompliance to have occurred are: (1) GRI's leases on which the Houston #1, #2, #3, #4, and #22 wells were drilled have expired; (2) those wells have not been plugged in accordance with 20 AAC 25.112, as required by 20 AAC 25.105(a); and (3) the well locations have not been cleared in accordance with and as required by 20 AAC 25.170. The actions that the Commission proposes to take include reqUiring payment under GRI's surety bond number KO5880877, imposing monetary penalties under AS 31.05.150, and ordering corrective action or remedial work. As provided under 20 AAC 25.535(c), within 15 days after receipt of this notice, GRI (or GRI's surety) may file with the Commission a written response that concurs in whole or in part July 18,2001 Page 2 of 2 with a proposed Commission action, requests informal review, or requests a hearing under 20 AAC 25.540. The Commission will, in its discretion, extend the 15-day response period for good cause shown. If GRI and its surety fail to file a timely written response, the Commission will consider them to have accepted the proposed Commission action by default. If GRI or its surety requests a hearing, the Commission will schedule a hearing under 20 AAC 25.540. If GRI or GRI's surety requests informal review under 20 AAC 25.535(c), the Commission will provide an opportunity for them to submit documentary material and make a written or oral statement. The Commission will then issue a proposed decision or order. A proposed decision or order becomes final 11 days after it is issued unless within 10 days after it is issued GRI or its surety files a written request for a hearing, in which case the proposed decision or order is of no effect. If GRI or its surety requests a hearing, the Commission will schedule a hearing under 20 AAC 25.540. If GRI and its surety concur in the Commission's proposed action(s) described above, or after an informal review or a hearing under 20 AAC 25.535(c) or 20 AAC 25.535(d), and if the Commission finds that GRI has violated or failed to comply with a provision of AS 31.05, 20 AAC 25, or a Commission order, permit, or other approval, the Commission will, in its discretion, order one or more of the following, as it determines to be applicable: (1) corrective action or remedial work; (2) revocation or suspension of a permit or other approval; (3) payment under the bond required by 20 AAC 25.025; (4) imposition of penalties under AS 31.05.150. Because one of the actions the Commission proposes to take is requiring forfeiture of and payment under GRI's surety bond, a copy of this notice is also bein~ orovided lo.the surety. SCANNED MgY Z 9 20~02 (~arnmy ~aylo~) Chair L/ Alaska Oil and Gas Conservation Cmnmission ~fa~iel T. Se~uTM, Jr. Commissioner Julie M. Heusser Commissioner CC: Ace USA Insurance Company PO Box 41484 Philadelphia PA 19101-1484 Certified Mail No. 7099 3400 0004 8967 1296 Insurance Company of North America 4220 B Street Anchorage AK 99503 Certified Mail No. 7099 3400 0004 8967 1326 AOGCC Geological Materials Inventory PERMIT 97-144 ARCO Log Data Sent Recieved 8150 ~LuM CET 10/17/97 10/20/97 DEFT-PSP 1~4950-15175 ~/~[ ~/~ 7/21/98 7/24/98 DGR/CNP/SLD-MD '..~.589~2-15417 11/19/97 11/19/97 DGR/CNP/SLD-TVD t6~-9149 11/19/97 11/19/97 Box DGR/EWR4-TVD 3&2o4'-9149 11/19/97 11/19/97 GLS .-~50ff6~ 14900 6/8/99 7/29/99 8/13/99 O~~ GR/EWR4-MD ~922-15417 11/19/97 11/19/97 MWD SRVY ~.~'~V 7001-15417 9/29/97 10/1/97 PROD-PSP ~q'~950-15175 q/~'~/~ ~ 7/21/98 7/24/98 Ogg CET /~4950-15215 10/20/97 10/20/97 T0~-407 Completion Date c-ttt/°3'~ ~[ ?? ) Daily ~vell ops ~:l/1/'~'~ ?__ C]4~,~_ 5/?' ? Are dry ditch samples required? yes ~_..no And received.a~ - yes : ..... no Was the well cored? yes .~5~_ no Analysis description recieved? '.~4aes._.~__- no yes ~mo Received? -- ---- , Are tests required? Well is in compliance Initial Comments Thursday, September 23, 1999 Page 1 of l Sch mberger Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie NO. 12718 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Point Mclntyre (Cased Hole) Well Job # Log Description Date BL Sepia CD P2-45A ~ GAS LIFT SURVEY 990608 I I J '~~~i~l~ '.~.i. iO '1 ¥ t999 SlG DATE: i:~a~ka Oil & (.;as Co~. ^nct!0ra~e Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank 7/29/99 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 11352 Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Point Mclntyre 7/21/98 Floppy Well Job # Log Description Date BL RF Sepia Disk P 1 - 17 ~';t % - o'-~--I PRODUCTION LOG 980701 I 1 P 1 - 17 ~" DIGITAL FLOW ENTRY LOG 980701 I 1 P1-20 ~ ~ ~ PRODUCTION PROFILE 980421 I 1 P1-23 ~'(~. I ;~ ~ PRODUCTION PROFILE 980526 I 1 P1-23 ,J~- DEFT LOG 980526 I 1 PM 2-09 ~% ©~ G~ ' CEMENT EVALUATION LOG 980611 I 1 P2-10 C[~, L~'~ EFT 980523 I 1 P2-10 ~,-~ CEMENT EVALUATION LOG 98061 7 I 1 P2-19 C~. o-~oi CEMENT EVALUATION LOG 980414 I 1 P2-37 C{~; - I~qa PRODUCTION PROFILE 980504 I 1 P2-37 ~ DEFT LOG 980504 I 1 P2-44 C~G~, ~;;x~ CEMENT EVALUATION LOG 98041 3 I 1 P2-44 { PRODUCTION PROFILE 98041 5 I 1 P2-44~ PRODUCTION PROFILE W/DEFT 98061 5 1 1 P2-45A ~'-' I~ PRODUCTION PROFILE 980423 I 1 P2-45 A ,b~ DEFT LOG 980423 ~' , Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well [] Oil I-q Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number ARCO Alaska Inc. 97-144 13. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 ................ 50-029-22769-01 ~ :'"" ,~i ~' :~" ~ - 4. Location of well at surface :- " ............. ; ',j~ 9. Unit or Lease Name 398' SNL, 1296' EWL, SEC. 14, T12N, R14E, UM ......... ~_?.I~' Point Mclntyre ... At top of productive interval i i(i~:.!:!~ iI [~"¢¢'~ 10. Well Number 4302' SNL, 1289' EWL, SEC. 18, T12N, R15E, UM ~. i t P2-45A At total depth ~'":; ....... ' .... ' .... -~'~' ~~~'"~ 11. Field and Pool 4378' SNL, 1536' EWL, SEC. 18, T12N, R15E, UM~~-- Point Mclntyre 5. Elevation in feet (indicate KB, DF, etc.) ] 6. Lease Designation and Serial No. KBE = 45'I ADL 034627 , 12. Date Spudded8/30/97 113' Date T'D' Reached ! 14' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re 116' N°' °f C°mpleti°ns9/4/97 9/24/97 N/A MSL, One 17. Total Depth (MD+TVD)]18. Plug Back Depth (MD+TVD)I19. Directional Survey ]20. Depth where SSSV set 121. Thickness of Permafrost 15417 9196 FTI 15321 9139 FTI [~Yes ~]No 2200' MD 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, LWD, GR/RES/DEN/NEU 23. CASlNG~ LINER AND CEMENTING RECORD CASING SE-I-rING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 133# H-40 35' 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 34' 6992' 12-1/4" 1761 sx Coldset III, 644 sx 'G' 7" 26#/29# L-80/13CR80 31' 15406' 8-1/2" 335 sx Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SEE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6 spf 4-1/2", 12.6#, 130R80 14937' 14891' MD TVD MD TVD ,,, 15093'-15183' 9000'-9055' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect with 193 bbls diesel 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) September 30, 1997I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAViTY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. !. ~, .'."~ ..-" ~. ' :~ .~. :' !~i i '.'. ORIGINAL , ,-. ~.~ ..;',,i:;.;.?:_~_~ Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Kalubik 15010' 8948' Zone LC1 15093' 9000' Zone LB3 15198' 9064' 31. List of Attachments Summary of Daily Drilling Reports, Surveys Crrect to 32. I hereby certify that the fo e oing is tr and the best of my knowledge Date /~ ~; Steve Shultz Title Senior Drilling Engineer Prepared By Name/Number: Kathy Carr~oamor, 564-5122 Well Number Permit No. / Approval No. ~NSTRUCTIONS GENERAL.' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5; Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21= Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23.' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28'. If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Pt Mac 2 Progress Report Well P2-45 Rig Doyon 14 Page Date 1 28 October 97 Date/Time 01 Jun 97 02 Jun 97 03 Jun 97 04 Jun 97 05 Jun 97 06 Jun 97 07 Jun 97 08 Jun 97 03:00-06:00 06:00-07:30 07:30-01:30 01:30-02:00 02:00-03:00 03:00-03:30 03:30-04:00 04:00-06:00 06:00-07:00 07:00-07:30 07:30-08:30 08:30-06:00 06:00-16:00 16:00-16:30 16:30-17:30 17:30-18:00 18:00-06:00 06:00-12:30 12:30-13:00 13:00-14:00 14:00-19:00 19:00-19:30 19:30-00:30 00:30-02:00 02:00-06:00 09:00-11:00 11:00-11:30 11:30-13:00 13:00-14:00 14:00-15:00 15:00-19:00 19:00-20:00 20:00-21:30 21:30-06:00 06:00-08:00 08:00-10:00 10:00-13:00 13:00-15:00 15:00-17:30 17:30-20:30 20:30-22:30 22:30-00:00 00:00-06:00 06:00-09:00 09:00-11:00 11:00-14:00 14:00-16:00 16:00-18:30 18:30-20:00 20:00-21:00 21:00-02:00 02:00-06:00 06:00-07:00 07:00-08:00 Duration 3hr 1-1/2 hr 18hr 1/2 hr lhr 1/2hr 1/2 hr 2hr lhr 1/2 hr lhr 21-1/2 hr 10hr 1/2 hr lhr 1/2 hr 12hr 6-1/2 hr 1/2 hr lhr 5hr 1/2hr 5hr 1-1/2 hr 4hr 2hr 1/2 hr 1-1/2 hr lhr lhr 4hr lhr 1-1/2 hr 8-1/2 hr 2hr 2hr 3hr 2hr 2-1/2 hr 3hr 2hr 1-1/2 hr 6hr 3hr 2hr 3hr 2hr 2-1/2 hr 1-1/2 hr lhr 5hr 4hr lhr lhr Activity Rigged up Bell nipple Rigged up Top drive pipe handler Rigged down Top drive Held safety meeting Made up BHA no. 1 : Circulated at 50.0 ft Drilled to 186.0 ft Made up BHA no. 1 Made up BI-IA no. 1 (cont...) Drilled to 278.0 ft Made up BHA no. 1 Drilled to 3274.0 ft Drilled to 4496.0 ft (cont...) Circulated at 4496.0 ft Pulled out of hole to 3088.0 ft R.I.H. to 4496.0 ft Drilled to 6007.0 ft Drilled to 6404.0 ft Functioned Survey instruments Circulated at 6404.0 ft Jarred stuck pipe at 6289.0 ft Circulated at 6289.0 ft Worked stuck pipe at 6289.0 ft Circulated at 6289.0 ft Pulled out of hole to 1500.0 ft Made up BHA no. 2 Serviced Top drive Made up BHA no. 2 Made up BHA no. 2 Rigged up Block line R.I.H. to 5400.0 ft Circulated at 5400.0 ft R.I.H. to 6363.0 ft Drilled to 6869.0 ft Drilled to 7007.0 ft Circulated at 7007.0 ft Pulled out of hole to 1750.0 ft R.I.H. to 7007.0 ft Circulated at 7007.0 ft Pulled out of hole to 200.0 ft Pulled BHA Rigged up Casing handling equipment Ran Casing to 4500.0 ft (9-5/8in OD) Ran Casing to 6992.0 ft (9-5/8in OD) Circulated at 6992.0 ft Mixed and pumped slurry - 425.000 bbl Circulated at 1995.0 ft Mixed and pumped slurry - 310.000 bbl Cleared Flowline Rigged down Casing handling equipment Rigged up All functions Tested All functions Installed Top drive Tested Top drive Facility Pt Mac 2 Progress Report Well P2-45 Page 2 Rig Doyon 14 Date 28 October 97 Date/Time 09 Jun 97 10 Jun 97 11 Jun 97 12 Jun 97 13 Jun 97 14 Jun 97 15 Jun 97 08:00-08:30 08:30-11:30 11:30-12:30 12:30-13:30 13:30-15:30 15:30-18:30 18:30-19:30 19:30-20:30 20:30-21:00 21:00-23:30 23:30-00:00 00:00-00:30 00:30-06:00 06:00-09:00 09:00-10:00 10:00-10:30 10:30-11:00 11:00-12:30 12:30-13:00 13:00-01:00 01:00-01:30 01:30-02:30 02:30-03:30 03:30-06:00 06:00-22:30 22:30-02:00 02:00-03:00 03:00-05:00 05:00-06:00 06:00-09:00 09:00-05:00 05:00-06:00 06:00-07:15 07:15-08:00 08:00-06:00 06:00-08:00 08:00-10:00 10:00-15:00 15:00-16:00 16:00-16:30 16:30-20:00 20:00-20:30 20:30-23:00 23:00-02:00 02:00-03:00 03:00-06:00 06:00-13:30 13:30-16:00 16:00-17:00 17:00-18:00 18:00-23:00 23:00-00:00 00:00-00:30 00:30-02:30 Duration 1/2 hr 3hr lhr lhr 2hr 3hr lhr lhr 1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 5-1/2 hr 3hr lhr 1/2 hr 1/2 hr 1-1/2 hr 1/2 hr 12hr 1/2 hr lhr lhr 2-1/2 hr 16-1/2 hr 3-1/2 hr lhr 2hr lhr 3hr 20 hr lhr 1-1/4 hr 3/4 hr 22 hr 2hr 2hr 5hr lhr 1/2 hr 3-1/2 hr 1/2 hr 2-1/2 hr 3hr lhr 3hr 7-1/2 hr 2-1/2 hr lhr lhr 5hr lhr 1/2 hr 2hr Activity Installed Drillstring handling equipment Made up BHA no. 3 Installed Block line R.I.H. to 1995.0 ft Drilled installed equipment - DV collar '. R.I.H. to 6867.0 ft Circulated at 6867.0 ft Tested Casing - Via string Held drill (Kick (well kill)) Drilled installed equipment - Landing collar Circulated at 7027.0 ft Tested Other sub-surface equipment - Via string Drilled to 7450.0 ft Drilled to 7981.0 ft Circulated at 7981.0 ft Pulled out of hole to 6956.0 ft Tested Other sub-surface equipment - Via string ].. 07-.~/3.2~ torO" Serviced Block line R.I.H. to 7981.0 ft Drilled to 9489.0 ft Circulated at 9489.0 ft Pulled out of hole to 7700.0 ft R.I.H. to 9489.0 ft Drilled to 9773.0 ft Drilled to 10590.0 ft Pulled out of hole to 0.0 ft Made up BHA no. 4 R.I.H. to 6000.0 ft Serviced Block line R.I.H. to 10590.0 ft Drilled to 12212.0 ft Circulated at 12212.0 ft Pulled out of hole to 10532.0 ft R.I.H. to 12212.0 ft Drilled to 13780.0 ft Drilled to 13907.0 ft Circulated at 13907.0 ft Pulled out of hole to 175.0 ft Pulled BHA Retrieved Bore protector Tested BOP stack Installed Bore protector Made up BHA no. 5 R.I.H. to 6987.0 ft Serviced Block line R.I.H. to 9240.0 ft R.I.H. to 13907.0 ft Circulated at 13907.0 ft Drilled to 14038.0 ft Circulated at 14038.0 ft Pulled out of hole to 0.0 ft Downloaded MWD tool Repaired Draw works Made up BHA no. 5 Facility Pt Mac 2 Progress Report Well P2-45 Rig Doyon 14 Page Date 3 28 October 97 Date/Time 16 Jun 97 17 Jun 97 18 Jun 97 19 Jun 97 20 Jun 97 21 Jun 97 22 Jun 97 02:30-04:30 04:30-05:30 05:30-06:00 06:00-08:30 08:30-05:.45 05:45-06:'00 06:00-08:00 08:00-08:30 08:30-10:30 10:30-16:30 16:30-17:00 17:00-21:00 21:00-23:30 23:30-01:00 01:00-01:30 01:30-02:00 02:00-03:00 03:00-03:30 03:30-06:00 06:00-21:00 21:00-01:00 01:00-04:00 04:00-04:30 04:30-06:00 06:00-08:30 08:30-11:00 11:00-13:00 13:00-13:30 13:30-16:30 16:30-18:00 18:00-19:30 19:30-21:30 21:30-23:00 23:00-00:00 00:00-03:00 03:00-04:15 04:15-05:15 05:15-06:00 06:00-12:00 12:00-14:30 14:30-17:30 17:30-22:00 22:00-23:00 23:00-00:45 00:45-01:00 01:00-02:30 02:30-03:00 03:00-04:00 04:00-05:00 05:00-06:00 06:00-07:00 07:00-06:00 06:00-02:00 02:00-03:00 Duration 2hr lhr 1/2 hr 2-1/2 hr 21-1/4 hr 1/4 hr 2hr 1/2 hr 2hr 6hr 1/2 hr 4hr 2-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr lhr 1/2 hr 2-1/2 hr 15hr 4hr 3hr 1/2hr 1-1/2 hr 2-1/2 hr 2-1/2 hr 2hr 1/2 hr 3hr 1-1/2 hr 1-1/2 hr 2hr 1-1/2 hr lhr 3hr 1-1/4 hr lhr 3/4 hr 6hr 2-1/2 hr 3hr 4-1/2 hr lhr 1-3/4 hr 1/4 hr 1-1/2 hr 1/2 hr lhr lhr lhr lhr 23 hr 20 hr lhr Activity R.I.H. to 6987.0 ft Serviced Block line R.I.H. to 8000.0 ft R.I.H. to 14038.0 ft Drilled to 15690.0 ft Circulated at 15690.0 ft Circulated at 15690.0 ft Pulled out of hole to 15085.0 ft Rig waited: Equipment Worked stuck pipe at 15085.0 ft Pulled out of hole to 0.0 ft Jarred stuck pipe at 15085.0 ft Conducted electric cable operations Conducted electric cable operations Pulled out of hole to 0.0 ft R.I.H. to 124.0 ft Jarred stuck pipe at 15085.0 ft Mixed and pumped 30.000 bbl of treatment Jarred stuck pipe at 15085.0 ft Jarred stuck pipe at 15085.0 ft Rigged up Additional services Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Circulated at 15085.0 ft Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Conducted electric cable operations Worked toolstring at 15085.0 ft Worked stuck pipe at 15085.0 ft Circulated at 15000.0 ft Backreamed to 14667.0 ft Circulated at 14667.0 ft Pulled out of hole to 14100.0 ft Pulled out of hole to 0.0 ft Rig waited: Orders Made up BI-IA no. 7 R.I.H. to 6992.0 ft Serviced Block line R.I.H. to 9100.0 ft Circulated at 9100.0 ft R.I.H. to 11550.0 ft Circulated at 11550.0 ft R.I.H. to 14051.0 ft Circulated at 14051.0 ft Pulled out of hole to 13400.0 ft Pulled out of hole to 13200.0 ft Repaired Draw works Repaired Draw works R.I.H. to 13944.0 ft Facility Pt Mac 2 Progress Report Well P2-45 Rig Doyon 14 Page Date 4 28 October 97 Date/Time 23 Jun 97 24 Jun 97 25 Jun 97 26 Jun 97 03:00-06:00 06:00-06:00 06:00-06:30 06:30-12:30 12:30-13:00 13:00-13:30 13:30-16:30 16:30-17:00 17:00-17:30 17:30-21:30 21:30-00:00 00:00-01:00 01:00-03:45 03:45-05:30 05:30-06:00 06:00-00:00 00:00-01:30 O1:30-02:30 02:30-03:00 03:00-03:30 03:30-04:00 04:00-06:00 06:00-06:30 06:30-12:00 12:00-13:00 13:00-14:00 14:00-19:30 19:30-23:00 23:00-05:30 05:30-06:00 06:00-07:30 07:30-07:45 07:45-12:30 12:30-12:45 12:45-13:30 13:30-14:00 14:00-14:30 14:30-15:00 15:00-16:00 16:00-17:00 17:00-22:15 22:15-22:30 22:30-01:30 01:30-05:45 05:45-06:00 06:00-07:30 07:30-09:30 09:30-10:30 10:30-12:00 12:00-12:30 12:30-13:00 13:00-14:30 14:30-16:30 16:30-03:00 Duration 3hr 0hr 1/2 hr 6hr 1/2 hr 1/2 hr 3hr 1/2 hr 1/2 hr 4hr 2-1/2 hr lhr 2-3/4 hr 1-3/4 hr 1/2 hr 18hr 1-1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 2hr 1/2hr 5-1/2 hr lhr lhr 5-1/2 hr 3-1/2 hr 6-1/2 hr 1/2 hr 1-1/2 hr 1/4 hr 4-3/4 hr 1/4 hr 3/4 hr 1/2 hr 1/2 hr 1/2 hr lhr lhr 5-1/4 hr 1/4 hr 3hr 4-1/4 hr 1/4 hr 1-1/2 hr 2hr lhr 1-1/2 hr 1/2 hr 1/2 hr 1-1/2 hr 2hr 10-1/2 hr Activity Washed to 14090.0 ft Washed to 14100.0 fi Washed to 14100.0 ft Pulled out of hole to 351.0 ft Pulled BHA Retrieved Bore protector Tested BOP stack Installed Bore protector Made up BHA no. 8 R.I.H. to 9100.0 ft Reamed to 10037.0 ft Worked stuck pipe at 10052.0 ft Reamed to 10791.0 ft R.I.H. to 13980.0 fi Circulated at 13980.0 ft Reamed to 14926.0 ft Circulated at 14926.0 fi Pulled out of hole to 13826.0 ft R.I.H. to 14066.0 ft Reamed to 14066.0 ft R.I.H. to 14926.0 ft Circulated at 14926.0 ft Circulated at 14926.0 ft Pulled out of hole to 900.0 fi Pulled BHA Made up BHA no. 9 R.I.H. to 14051.0 fi Reamed to 14059.0 fi Pulled out of hole to 441.0 fi Pulled BI-LA Pulled BHA Made up BHA no. 10 R.I.H. to 9640.0 ft Circulated at 9640.0 ft R.I.H. to 14815.0 fi Washed to 14926.0 ft Mixed and pumped slurry - 108.000 bbl Displaced slurry - 226.000 bbl Pulled out of hole to 13490.0 fi Circulated at 13490.0 ft Pulled out of hole to 10.0 ft Pulled BHA Made up BHA no. 11 R.I.H. to 10544.0 ft R.I.H. to 10600.0 ft R.I.H. to 13400.0 ft (cont...) Washed to 13909.0 ft Circulated at 13909.0 fi Reamed to 14090.0 ft Drilled cement to 14100.0 ft Pulled out of hole to 13846.0 ft Drilled to 13909.0 fl Worked toolstring at 13846.0 ft Drilled to 13919.0 fi Progress Report Facility Pt Mac 2 Well P2-45 Rig Doyon 14 Page 5 Date 28 October 97 Date/Time 27 Jun 97 28 Jun 97 29 Jun 97 30 Jun 97 O1 Jul 97 02 Jul 97 03 Jul 97 03:00-03:30 03:30-06:00 06:00-08:00 08:00-09:30 09:30-09:45 09:45-14:30 14:30-15:30 15:30-15:45 15:45-16:30 16:30-16:45 16:45-17:15 17:15-23:15 23:15-23:30 23:30-01:00 01:00-03:30 03:30-04:30 04:30-06:00 06:00-07:00 07:00-07:30 07:30-08:30 08:30-12:00 12:00-12:30 12:30-23:30 23:30-06:00 06:00-06:00 06:00-16:30 16:30-17:30 17:30-22:30 22:30-23:30 23:30-23:45 23:45-02:45 02:45-03:00 03:00-06:00 06:00-09:30 09:30-10:30 10:30-10:45 10:45-15:45 15:45-16:00 16:00-19:00 19:00-19:30 19:30-21:30 21:30-00:00 00:00-01:00 01;00-05:00 05:00-06:00 06:00-09:30 09:30-10:30 10:30-14:00 14:00-03:00 03:00-03:30 03:30-06:00 06:00-11:30 11:30-13:30 13:30-18:30 Duration 1/2 hr 2-1/2 hr 2hr 1-1/2 hr 1/4 hr 4-3/4 hr lhr 1/4 hr 3/4 hr 1/4 hr 1/2 hr 6hr 1/4 hr l-l/2 hr 2-1/2 hr lhr l-l/2 hr lhr 1/2 hr lhr 3-1/2 hr 1/2hr llhr 6-1/2 hr 24 hr 10-1/2 hr lhr 5hr lhr 1/4 hr 3hr 1/4 hr 3hr 3-1/2 hr lhr 1/4 hr 5hr 1/4 hr 3hr 1/2 hr 2hr 2-1/2 hr lhr 4hr lhr 3-1/2 hr lhr 3-1/2 hr 13 hr 1/2hr 2-1/2 hr 5-1/2 hr 2hr 5hr Activity Circulated at 13919.0 ft Pulled out of hole to 8200.0 ft Pulled out of hole to 8200.0 ft (cont...) Pulled BHA Made up BHA no. 12 R.I.H. to 14040.0 ft Washed to 13995.0 ft Held safety meeting Circulated at 13995.0 ft Mixed and pumped slurry - 37.000 bbl Displaced slurry - 223.000 bbl Pulled out of hole to 10.0 ft Pulled BI-IA Made up BI-IA no. 13 R.I.H. to 6992.0 ft Serviced Block line R.I.H. to 11000.0 fi R.I.H. to 13102.0 ft (cont...) Washed to 13752.0 ft Circulated at 13752.0 ft Wait on cement Washed to 13855.0 ft Drilled to 13876.0 ft Drilled to 14001.0 fi Drilled to 14689.0 fi (cont...) Drilled to 14945.0 ft (cont...) Serviced High pressure lines Drilled to 15064.0 ft Circulated at 15064.0 ft Flow check Pulled out of hole to 13700.0 ft Circulated at 13700.0 ft Pulled out of hole to 5700.0 ft Pulled out of hole to 300.0 ft (cont...) Pulled BHA Installed BOP test plug assembly Tested All functions Retrieved BOP test plug assembly Repaired Kelly/top drive hose Tested Kelly/top drive hose Made up BHA no. 13 R.I.H. to 6985.0 ft Serviced Block line R.I.H. to 14220.0 ft Washed to 14800.0 ft Washed to 15065.0 ft (cont...) Worked toolstring at 15065.0 fi Repaired Top drive Jarred stuck pipe at 15065.0 ft Tested Fluid system Rest hole at 15065.0 ft Rest hole at 15065.0 ft (cont...) Rigged up Logging/braided cable equipment Conduct braided cable operations - 5/16 size cable Progress Report Facility Pt Mac 2 Well P2-45 Rig Doyon 14 Page 6 Date 28 October 97 Date/Time 18:30-21:00 21:00-01:00 04 Jul 97 01:00-02:30 02:30-06:00 06:00-07:00 07:00-09:00 09:00-11:30 11:30-13:30 13:30-20:00 20:00-22:00 22:00-03:30 05 Jul 97 03:30-06:00 06:00-20:00 20:00-21:00 21:00-21:15 21:15-21:30 21:30-03:00 06 Jul 97 03:00-05:00 05:00-06:00 06:00-07:00 07:00-08:00 08:00-09:00 09:00-13:00 13:00-14:00 14:00-17:30 17:30-18:15 18:15-03:00 07 Jul 97 03:00-04:00 04:00-06:00 06:00-06:00 08 Jul 97 06:00-07:00 07:00-09:00 09:00-12:00 12:00-14:00 14:00-20:00 20:00-21:30 21:30-04:00 09 Jul 97 04:00-05:30 05:30-05:45 05:45-06:00 06:00-12:30 12:30-13:30 13:30-14:30 14:30-21:30 21:30-22:00 22:00-22:30 22:30-23:30 23:30-00:30 10Jul97 00:30-02:00 02:00-03:30 03:30-04:00 04:00-04:30 04:30-05:30 05:30-06:00 Duration 2-1/2 hr 4hr 1-1/2 hr 3-1/2 hr lhr 2hr 2-1/2 hr 2hr 6-1/2 hr 2hr 5-1/2 hr 2-1/2 hr 14 hr lhr 1/4 hr 1/4 hr 5-1/2 hr 2hr lhr lhr lhr lhr 4hr lhr 3-1/2 hr 3/4 hr 8-3/4 hr lhr 2hr 24 hr lhr 2hr 3hr 2hr 6hr 1-1/2 hr 6-1/2 hr 1-1/2 hr 1/4 hr 1/4 hr 6-1/2 hr lhr lhr 7hr 1/2 hr 1/2 hr lhr lhr 1-1/2 hr 1-1/2 hr 1/2hr 1/2 hr lhr 1/2hr Activity Conduct braided cable operations - 5/16 size cable Conduct braided cable operations - 5/16 size cable Conduct braided cable operations - 5/16 size cable Conduct braided cable operations - 5/16 size cable Laid down 30.0 ft of 5in OD drill pipe Fished at 567.0 ft Conduct braided cable operations - 5/16 size cable Rigged down Logging/braided cable equipment Pulled out of hole to 0.0 ft Made up BHA no. 14 · R.I.H. to 13047.0 ft Reamed to 13700.0 ft Reamed to 14870.0 ft (cont...) Circulated at 14860.0 ft Circulated at 14860.0 ft Flow check Pulled out of hole to 8000.0 ft Laid down 6000.0 ft of 5in OD drill pipe Pulled BHA Rest hole at 0.0 ft Made up BHA no. 15 Serviced Top drive pipe handler Singled in drill pipe to 6401.0 ft Serviced Block line R.I.H. to 14830.0 ft Washed to 14865.0 ft Jarred stuck pipe at 14865.0 ft Circulated at 15065.0 ft Jarred stuck pipe at 14870.0 ft Jarred stuck pipe at 14870.0 ft (cont...) Jarred stuck pipe at 14870.0 ft (cont...) Rigged up Logging/braided cable equipment Conducted electric cable operations Pulled out of hole to 0.0 ft Conducted electric cable operations Circulated at 14830.0 ft Pulled out of hole to 425.0 ft Pulled BHA Made up BHA no. 16 R.I.H. to 500.0 ft R.I.H. to 14863.0 ft (cont...) Circulated at 14863.0 ft Mixed and pumped slurry - 35.000 bbl Laid down 6963.0 ft of 5in OD drill pipe Circulated at 7900.0 ft Mixed and pumped slurry - 28.000 bbl Pulled out of hole to 6407.0 ft Circulated at 6407.0 ft Held safety meeting Circulated at 6407.0 ft R.I.H. to 7200.0 ft Washed to 7500.0 ft Mixed and pumped slurry - 86.000 bbl Pulled out of hole to 6600.0 ft Progress Report Facility Pt Mac 2 Well P2-45 Rig Doyon 14 Page 7 Date 28 October 97 Date/Time 11 Jul 97 06:00-07:30 07:30-14:30 14:30-15:30 15:30-15:45 15:45-16:30 16:30-18:00 18:00-19:30 19:30-22:30 22:30-00:00 00:00-02:00 02:00-02:30 02:30-03:30 03:30-06:00 06:00-07:00 07:00-08:30 08:30-09:00 Duration 1-1/2 hr 7hr Ilar 1/4 hr 3/4 hr 1-1/2 hr 1-1/2 hr 3hr 1-1/2 hr 2hr 1/2 hr lhr 2-1/2 hr lhr 1-1/2 hr 1/2 hr Activity Pulled out of hole to 5548.0 ft (cont...) Circulated at 5548.0 ft R.I.H. to 6500.0 ft Washed to 6618.0 ft Circulated at 6618.0 ft Tested Tubular strings - Via string Circulated at 6618.0 ft Laid down 4298.0 ft of 3-1/2in OD drill pipe Freeze protect well - 167.000 bbl of Diesel Laid down 2345.0 ft of 3-1/2in OD drill pipe Removed Bore protector Installed Hanger plug Removed BOP stack Installed Adapter spool Installed Xmas tree Tested Xmas tree Progress Report Facility Pt Mac 2 Well P2-45/1 Rig Doyon 14 Page 1 Date 28 October 97 Date/Time 28 Aug 97 18:30-19:00 19:00-19:15 19:15-20:00 20:00-23:00 23:00-01:00 29 Aug 97 01:00-02:30 02:30-02:45 02:45-06:00 06:00-06:30 06:30-06:45 06:45-07:00 07:00-09:30 09:30-11:00 11:00-12:30 12:30-14:30 14:30-15:30 15:30-17:30 17:30-18:00 18:00-19:00 19:00-20:00 20:00-02:00 30 Aug 97 02:00-06:00 06:00-04:30 31 Aug 97 04:30-05:30 05:30-05:45 05:45-06:00 06:00-07:00 07:00-07:30 07:30-07:45 07:45-10:30 10:30-11:30 11:30-13:30 13:30-16:00 16:00-17:00 17:00-18:00 18:00-18:30 18:30-06:00 01 Sep 97 06:00-05:15 02 Sep 97 05:15-06:00 06:00-06:30 06:30-07:30 07:30-08:30 08:30-06:00 03 Sep 97 06:00-15:00 15:00-15:30 15:30-17:00 17:00-18:00 18:00-06:00 04 Sep 97 06:00-11:00 11:00-12:30 12:30-17:00 17:00-18:00 18:00-18:30 18:30-21:00 Duration 1/2 hr 1/4 hr 3/4 hr 3hr 2hr 1-1/2 hr 1/4 hr 3-1/4 hr 1/2 hr 1/4 hr 1/4 hr 2-1/2 hr 1-1/2 hr 1-1/2 hr 2hr lhr 2hr 1/2 hr lhr lhr 6hr 4hr 22-1/2 hr lhr 1/4 hr 1/4 hr lhr 1/2 hr 1/4 hr 2-3/4 hr lhr 2hr 2-1/2 hr lhr lhr 1/2 hr 11-1/2 hr 23-1/4 hr 3/4 hr 1/2 hr lhr lhr 21-1/2 hr 9hr 1/2 hr 1-1/2 hr lhr 12hr 5hr 1-1/2 hr 4-1/2 hr lhr 1/2 hr 2-1/2 hr Activity Rigged up Drillfloor / Derrick Flow check Removed Xmas tree Installed BOP stack Rigged up Kelly Removed Tubing hanger Installed BOP test plug assembly Tested All functions Tested All functions (cont...) Removed BOP test plug assembly Installed Bore protector Made up BHA no. 1 Singled in drill pipe to 2507.0 ft Circulated at 2507.0 ft Singled in drill pipe to 4476.0 ft Serviced Block line Singled in drill pipe to 6494.0 ft Reamed to 6578.0 ft Tested Casing - Via annulus and string Held drill (Kick (well kill)) Drilled cement to 7042.0 ft F..;c.}~. o/242 Drilled to 7057.0 ft Drilled to 8923.0 ft (cont...) Circulated at 8923.0 ft Flow check Pulled out of hole to 8520.0 ft Pulled out of hole to 8520.0 ft (cont...) Reamed to 7200.0 ft Flow check Pulled out of hole to 650.0 ft Pulled BHA Made up BHA no. 2 R.I.H. to 6924.0 ft Serviced Block line R.I.H. to 8841.0 ft Took MWD survey at 8841.0 ft Drilled to 10016.0 ft Drilled to 12015.0 ft (cont...) Circulated at 12015.0 ft Flow check Pulled out of hole to 8868.0 ft R.I.H. to 12015.0 fl Drilled to 13576.0 ft Drilled to 14248.0 ft (cont...) Circulated at 14248.0 ft Drilled to 14344.0 ft Circulated at 14344.0 ft Drilled to 15078.0 ft Drilled to 15417.0 ft Circulated at 15417.0 ft Pulled out of hole to 6988.0 ft Serviced Block line Reamed to 7129.0 ft R.I.H. to 15417.0 ft Facility Pt Mac 2 Progress Report Well P2-45 J~ Rig Doyon 14 Page Date 2 28 October 97 Date/Time 05 Sep 97 06 Sep 97 07 Sep 97 08 Sep 97 21:00-03:00 03:00-04:00 04:00-06:00 06:00-14:00 14:00-16:30 16:30-17:00 17:00-18:00 18:00-18:30 18:30-06:00 06:00-09:30 09:30-13:30 13:30-13:45 13:45-17:00 17:00-19:00 19:00-19:15 19:15-20:15 20:15-21:15 21:15-22:00 22:00-01:30 01:30-03:30 06:00-08:00 08:00-09:00 09:00-09:15 09:15-18:00 18:00-18:15 18:15-00:30 00:30-01:30 01:30-05:00 05:00-06:00 06:00-06:30 06:30-12:30 12:30-13:00 13:00-14:00 14:00-17:00 17:00-18:00 Duration 6hr lhr 2hr 8hr 2-1/2 hr 1/2 hr lhr 1/2 hr 11-1/2 hr 3-1/2 hr 4hr 1/4 hr 3-1/4 hr 2hr 1/4 hr lhr lhr 3/4 hr 3-1/2 hr 2hr 2hr lhr 1/4 hr 8-3/4 hr 1/4 hr 6-1/4 hr lhr 3-1/2 hr lhr 1/2 hr 6hr 1/2 hr lhr 3hr lhr Activity Circulated at 15417.0 ft Circulated at 15417.0 ft Pulled out of hole to 12441.0 ft Pulled out of hole to 200.0 ft Pulled BHA Removed B ore protector Rigged up Casing handling equipment Held safety meeting Ran Casing to 12218.0 ft (7in OD) Ran Casing to 15406.0 ft (7in OD) Circulated at 15406.0 ft Flow check Circulated at 15406.0 ft Flow check Held safety meeting Mixed and pumped slurry - 69.800 bbl Displaced slurry - 585.000 bbl Tested Casing Rigged down Casing handling equipment Installed Seal assembly Laid down 2580.0 ft of Drillpipe Serviced Block line Held safety meeting Ran Tubing to 7918.0 ft (4-1/2in OD) Held safety meeting Ran Tubing to 12737.0 ft (4-1/2in OD) Installed SCSSSV Ran Tubing to 14937.0 ft (4-1/2in OD) Rigged up Tubing hanger Ran Tubing to 14937.0 ft (4-1/2in OD) Reverse circulated at 14937.0 ft Installed Hanger plug Removed BOP stack Installed Xmas tree Removed Hanger plug - - EL Well-Work Log ...... ., Dat'~ ':: De~iption . ; ,-.~.:~ ..~.:r ~:..:-.'- :-:..- : . - .. 9124197 ' INmAL PERFS <90:'.ZONE) 15093"15183'. P2-45A I . SSSV nipple N/A · 1~ psi ~ . 700 psi '! 3.725"e14925 ~~O S~V ~f~on . . Tu~Mr ~~~ Pro~- - .~ ~- - . - ,, . 15205' . ~E~I' '~:~.. ~GIE~2. : ~-' ~~'~ ' ~ ~ -. ~E ~- . S23,gg3 ':~OiL $3,851 -' Ui~ (~ov.)' : Ul.~ (non n~o~ - AFE ~ ~ C~ '" ACtivl~ :, -: ' ' ~ ' 2B0212- ' . ~H ~ ~~ b i i ~. · 08:00 ~SUN~~~R~S ~W~I~RIGUPI~G~ . - o9:oo - . . . . 11:00' ~~~'R~UP~~ , - ..... ' 1.~ :30 PREPARE ~ ~ ~ ~.' · . ,. . ' 12:00 RIH W/1ST ~ 3-~ HSD DP GUN " 13:30 ~E-I~ ~0 ~Y L~ (SWS C~ DAT~ g~, S~ R~ ~~"IN ~Y ._. i L II II I : . . in II 14;00' SHOT 1ST~UN (15~3':15123') POOH- ~ - i ii _1 LJ I I 16:30- RIHW/2ND30'3~8"H~DDPGuN ' · . , , , ~ 8:,3o ~NTp~X ~ .... 1~:40 - }SHOT'2ND GUN [15123'-15153') ~H ' . , ' ....... 21:00' RIH W/3RD.~' 3 ~8" HSD DP GUN '23:00 : ~'SHOT'3RD GUN ~15093',15123'~ PO~H .' ., . , , . · 24:00 - ATSURF~E R~ ~ BE~N. . ~ ..... 01:00 R~ ~ RN~ P~O~ OF L~A~ ' ' . _ _. ., i . ~ - . , . ' · .. --""' . . . . - . . . ' : i i i_ i JI . - . ; .. . .. ! .. ,-- . .i ill : i , . . ' .- . -: . .: :' : -.. . ., ... . ~... ., , . . . . . . . , __ I = i I I : ' I I I _ I I I1~ . . ' I II I I II I II I II . - '~' . -. . I II I I '- INI~AL PERFS: ~' (15~'-1~"~ W/3"~/6:HSD,'34B ~11, 6 SPF~ ~=; NO CHANGE I~ ~I~P DURING ~ RUN9 - DID ~T N~ TO PUMP GUNS ~. M~E ~REE ~' RUNS '":. - · " ~ _ : i . .. .~. .. : . · . . · TAG'.D 'P~q e .lS~S' (m~' ~H) . . .... ~ .... . . . -- , . . . : ; . , , ' ,.,, __ (BH~ dep~.) & Gun'l~, ~~e'rli~ '~ ~~. Top (fi) BoSom' ~ Gmm~HD~P ~- Orient OIBIu ~ A~eped 15093 =~.15:183: .6- : - 20.510.4.121.g~ -- 6~ ~ B LCl~B3 . .i . ,i ,. i i . Por. IPR~F= .Wall ~'.~h:'~0) .... . .... ~ ":' ump.'~ Loga,{LDL~ ~: :. F~: ... ' MD: .. : , N~t~ ~ pump~ and bbls ~hind 'To[ Gas=I ~ · ~: ., ~ . pi~ in 'log en~" ~p~ ne~ to each ~:~ . '-~c (~): ~ , ~ ~ .... . 'GL ~:~ .. C~ =: .,_ 'Tamp: ,.., ' ' ' ' ~ ' - PagaNo. of SPE~ -SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE ARCO ALASKA, INC. POINT MCINTYRE / P2-45A 500292276901 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/23/97 DATE OF SURVEY: 090497 MWD SURVEY JOB NUMBER: AK-MM-70249 KELLY BUSHING ELEV. = OPERATOR: ARCO ALASKA, 46.20 INC. FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATE DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 7001.55 4955.84 4909.64 7042.00 4976.18 4929.98 7090.07 4999.60 4953.40 7186.20 5043.91 4997.71 7282.30 5088.73 5042.53 59 52 59 44 61 56 63 10 61 13 S 64.69 E .00 1529.26S 3981.28E S 64.17 E 1.16 1544.35S 4012.82E S 65.67 E 5.33 1562.13S 4050.83E S 70.15 E 4.33 1594.19S 4129.86E S 68.26 E 2.68 1624.35S 4209.33E 4264.68 4299.51 4341.34 4426.59 4511.58 7378.95 5135.53 5089.33 7474.10 5181.67 5135.47 7570.19 5227.14 5180.94 7666.75 5272.59 5226.39 7762.05 5317.59 5271.39 60 52 61 6 62 24 61 26 62 12 S 69.12 E .86 1655.09S 4288.11E S 68.67 E .48 1685.05S 4365.74E S 65.76 E 2.99 1717.84S 4443.77E S 68.74 E 2.90 1750.79S 4522.32E S 68.02 E 1.05 1781.74S 4600.41E 4596.14 4679.35 4763.92 4849.03 4933.02 7856.08 5361.18 5314.98 7951.37 5406.30 5360.10 8047.85 5452.90 5406.70 8142.15 5497.66 5451.46 8237.29 5541.76 5495.56 62 32 60 55 61 19 62 0 62 46 S 69.29 E 1.25 1812.06S 4678.01E S 69.54 E 1.73 1841.57S 4756.57E S 69.62 E .42 1871.05S 4835.74E S 69.38 E .76 1900.11S 4913.48E S 67.20 E 2.19 1931.30S 4991.79E 5016.32 5100.24 5184.72 5267.71 5351.98 8333.01 5585.93 5539.73 8427.52 5630.05 5583.85 8522.44 5674.18 5627.98 8618.07 5719.68 5673.48 8711.08 5764.45 5718.25 62 62 62 60 61 15 5 30 4O 46 S 69.88 E 2.54 1962.36S 5070.79E S 72.19 E 2.17 1989.52S 5149.82E S 72.37 E .46 2015.10S 5229.87E S 70.16 E 2.78 2042.09S 5309.52E S 68.41 E 2.03 2070.93S 5385.76E 5436.86 5520.39 5604.33 5688.40 5769.91 8806.22 5811.07 5764.87 8933.62 5875.85 5829.65 9028.80 5924.18 5877.98 9123.81 5972.16 5925.96 9218.71 6019.70 5973.50 9313.56 6066.84 6020.64 9409.42 6114.41 6068.21 9503.75 6161.12 6114.92 9598.88 6207.48 6161.28 9693.02 6252.20 6206.00 59 31 59 21 59 35 59 44 60 7 60 16 60 13 60 24 61 16 62 0 S 68.91 E 2.42 2101.11S 5462.99E S 68.84 E .13 2140.65S 5565.32E S 68.84 E .25, 2170.24S 5641.78E S 70.73 E 1.72 2198.58S 5718.73E S 70.98 E .47 2225.51S 5796.32E S 69.69 E 1.19 2253.21S 5873.82E S 69.22 E .43 2282.42S 5951.75E S 69.40 E .25 2311.37S 6028.42E S 70.90 E 1.65 2339.57S 6106.54E S 71.02 E .78 2366.59S 6184.85E 5852.81 5962.51 6044.50 6126.49 6208.60 6290.89 6374.12 6456.07 6539.12 6621.93 9788.93 6296.98 6250.78 9885.36 6341.74 6295.54 9979.17 6384.92 6338.72 10074.58 6428.21 6382.01 10168.70 6470.58 6424.38 62 20 62 20 62 49 63 12 63 16 S 70.16 E .87 2394.78S 6264.84E S 71'.26 E 1.01 2422.99S 6345.45E S 73.92 E 2.57 2447.90S 6424.90E S 71.88 E 1.95 2472.90S 6506.15E S 72.80 E .88 2498.39S 6586.23E 6706.73 6792.13 6875.26 6960.13 7044.07 ORIGINAL 02Y 0 ] }99~ A]cska Oil & Gas ~ns. Corr~r~.~ Anchora9~ SPE} -SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASKA, INC. POINT MCINTYRE / P2-45A 500292276901 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/23/97 DATE OF SURVEY: 090497 MWD SURVEY JOB NUMBER: AK-MM-70249 KELLY BUSHING ELEV. = 46.20 OPER3kTOR: ARCO ALASKA, INC. FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGUL~ COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10263.75 6512.85 6466.65 63 54 10358.56 6555.33 6509.13 62 50 10453.29 6598.55 6552.35 62 51 10548.34 6641.18 6594.98 63 50 10643.46 6682.38 6636.17 64 49 S 73.20 E .76 2523.28S 6667.64E S 73.33 E 1.12 2547.69S 6748.81E S 72.12 E 1.14 2572.72S 6829.30E S 72.09 E 1.03 2598.82S 6910.14E S 72.03 E 1.04 2625.23S 6991.70E 7129.05 7213.62 7297.78 7382.65 7468.30 10739.57 6722.80 6676.60 10835.32 6763.14 6716.94 10930.96 6804.91 6758.71 11027.03 6847.88 6801.68 11123.26 6891.83 6845.63 65 25 64 45 63 27 63 25 62 13 S 71.96 E .62 2652.18S 7074.62E S 71.13 E 1.05 2679.67S 7156.99E S 73.09 E 2.29 2706.10S 7238.85E S 69.92 E 2.95 2733.35S 7320.32E S 68.71 E 1.67 2763.58S 7400.40E 7555.41 7642.19 7728.12 7813.98 7899.58 11218.43 6935.85 6889.65 11314.33 6979.14 6932.94 11409.73 7022.95 6976.75 11503.94 7067.70 7021.50 11598.50 7112.72 7066.52 62 40 63 39 61 39 61 36 61 32 S 68.54 E .49 2794.34S 7478.98E S 69.71 E 1.50 2824.82S 7558.93E S 68.60 E 2.34 2854.97S 7638.11E S 70.76 E 2.02 2883.75S 7715.84E S 71.55 E .74 2910.61S 7794.54E 7983.95 8069.51 8154.24 8237.12 8320.24 11693.46 7158.08 7111.88 11788.25 7203.50 7157.30 11882.68 7248.77 7202.57 11977.75 7294.16 7247.96 12071.86 7339.00 7292.80 61 22 61 22 61 19 61 38 61 26 S 71.72 E .23 2936.89S 7873.71E S 71.96 E .22 2962.82S 7952.77E S 69.38 E 2.40 2990.25S 8030.95E S 67.03 E 2.20 3021.26S 8108.50E S 69.45 E 2.27 3051.93S 8185.32E 8403.61 8486.75 8569.58 8653.07 8735.77 12166.55 7384.47 7338.27 61 10 12260.87 7430.03 7383.83 61 3 12357.12 7476.63 7430.43 61 1 12452.06 7522.66 7476.46 60 59 12548.08 7569.27 7523.07 60 55 S 68.83 E .64 3081.50S 8262.93E S 70.00 E 1.09 3110.54S 8340.24E S 69.36 E .58, 3139.78S 8419.22E S 70.25 E .82 3168.45S 8497.15E S 71.18 E .85 3196.17S 8576.38E 8818.83 8901.41 8985.62 9068.66 9152.59 12644.14 7615.94 7569.74 60 55 12739.33 7662.39 7616.19 60 39 12835.71 7709.87 7663.67 60 19 12931.41 7757.20 7711.00 60 24 13027.66 7805.02 7758.82 60 1 S 70.64 E .49 3223.63S 8655.72E S 70.94 E .40 3250.97S 8734.18E S 70.84 E .35 3278.43S 8813.43E S 71.75 E .83 3305.10S 8892.22E S 73.17 E 1.34 3330.27S 8971.86E 9236.52 9319.59 9403.44 9486.57 9569.99 13123.58 7853.60 7807.40 59 7 13219.17 7903.14 7856.94 58 27 13315.40 7954.38 7908.18 57 11 13411.30 8006.72 7960.52 56 39 13506.75 8059.49 8013.29 56 12 S 70.79 E 2.34 3355.85S 9050.49E S 67.65 E 2.89 3384.84S 9126.91E S 67.24 E 1.37 3416.08S 9202.13E S 67.54 E .61 3446.97S 9276.31E S 67.96 E .60 3477.09S 9349.92E 9652.60 9734.34 9815.73 9896.03 9975.53 SPE~ -SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASKA, INC. POINT MCINTYRE / P2-45A 500292276901 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/23/97 DATE OF SURVEY: 090497 MWD SURVEY JOB NUMBER: AK-MM-70249 KELLY BUSHING ELEV. = OPERATOR: ARCO ALASKA, 46.20 FT. INC. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 13603.22 8113.32 8067.12 55 57 S 68.08 E .28 3507.05S 13699.16 8167.33 8121.13 55 31 S 70.84 E 2.42 3534.87S 13795.91 8222.47 8176.27 54 59 S 71.35 E .70 3560.63S 13892.50 8278.22 8232.02 54 30 S 70.49 E .89 3586.41S 13986.86 8332.71 8286.51 54 57 S 68.20 E 2.04 3613.58S 9424.16E 10055.55 9498.39E 10134.82 9573.60E 10214.29 9648.14E 10293.14 9720.21E 10370.16 14082.50 8387.87 8341.67 54 36 S 69.96 E 1.54 3641.48S 14177.73 8442.97 8396.77 54 41 S 72.06 E 1.80 3666.75S 14274.39 8498.73 8452.53 54 50 S 72.04 E .16 3691.08S 14370.01 8553.78 8507.58 54 52 S 72.14 E .09 3715.12S 14465.59 8610.61 8564.41 52 9 S 70.07 E 3.33 3739.98S 9793.18E 10448.28 9866.61E 10525.91 9941.72E 10604.79 10016.12E 10682.90 10088.82E 10759.70 14561.35 8669.52 8623.32 51 54 S 69.93 E .30 3765.80S 14658.86 8730.04 8683.84 51 22 S 69.52 E .63 3792.29S 14753.47 8789.01 8742.81 51 30 S 71.05 E 1.27 3817.25S 14848.91 8848.16 8801.96 51 54 S 70.13 E .87 3842.14S 14944.05 8906.99 8860.79 51 41 S 69.87 E .32 3867.71S 10159.76E 10835.19 10231.48E 10911.65 10301.12E 10985.62 10371.76E 11060.51 10442.02E 11135.27 15039.59 8966.30 8920.10 51 34 S 72.89 E 2.48 15135.08 9025.61 8979.41 51 38 S 72.35 E .45 15231.50 9084.75 9038.55 52 41 S 72.77 E 1.14 15328.14 9142.84 9096.64 53 24 S 72.93 E .75 15379.47 9173.30 9127.10 53 47 S 73.66 E 1.39 3891.62S 10512.98E 11210.11 3913.98S 10584.40E 11284.84 3936.80S 10657.05E 11360.88 3959.57S 10730.84E 11437.98 3971.44S 10770.41E 11479.20 15417.00 9195.47 9149.27 53 47 S 73.66 E .00 3979.96S 10799.47E 11509.41 THE CALCULATION PROCEDURES ARE BASED O~ THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 11509.50 FEET - AT SOUTH 69 DEG. 46 MIN. EAST AT MD = 15417 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 110.'46 DEG. TIE-IN SURVEY AT 7001.00'MD KICKOFF POINT AT 7042.00' MD PROJECTED SURVEY AT 15,417.00' MD SPE~ -SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE ARCO ALASICA, INC. POINT MCINTYRE / P2-45A 500292276901 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/23/97 DATE OF SURVEY: 090497 JOB NUMBER: AK-MM-70249 KELLY BUSHING ELEV. = 46.20 FT. OPERATOR: ARCO ALASKA, INC. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 7001.55 4955.84 4909.64 1529.26 S 3981.28 E 2045.71 8001.55 5430.68 5384.48 1856.90 S 4797.66 E 2570.87 9001.55 5910.39 5864.19 2161.76 S 5619.86 E 3091.16 10001.55 6395.14 6348.94 2453.41 S 6444.03 E 3606.41 11001.55 6836.48 6790.28 2725.69 S 7298.86 E 4165.07 525.16 520.29 515.25 558.66 12001.55 7305.46 7259.26 3029.43 S 8127.78 E 4696.09 13001.55 7791.97 7745.77 3323.73 S 8950.21 E 5209.58 14001.55 8341.15 8294.95 3618.05 S 9731.37 E 5660.40 15001.55 8942.65 8896.45 3882.86 S 10484.50 E 6058.90 15417.00 9195.47 9149.27 3979.96 S 10799.47 E 6221.53 531.02 513.49 450.83 398.49 162.63 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPE~ -SUN DRILLING SERVICES ANCHOR3AGE ALASKA PAGE ARCO ALASKA, INC. POINT MCINTYRE / P2-45A 500292276901 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/23/97 DATE OF SURVEY: 090497 JOB NUMBER: AK-MM-70249 KELLY BUSHING ELEV. = 46.20 FT. OPERATOR: ARCO ALASKA, INC. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 7001.55 4955.84 4909.64 7191.23 5046.20 5000.00 7400.88 5146.20 5100.00 7611.04 5246.20 5200.00 1529.26 S 3981.28 E 1595.72 S 4134.07 E 1661.91 S 4306.01 E 1732.29 S 4476.88 E 2045.71 2145.03 99.32 2254.68 109..65 2364.83 110.16 7823.58 5346.20 5300.00 8033.89 5446.20 5400.00 8247.01 5546.20 5500.00 8462.02 5646.20 5600.00 8672.54 5746.20 5700.00 1801.86 S 4651.03 E 1866.78 S 4824.26 E 1934.65 S 4999.75 E 1998.84 S 5178.84 E 2058.48 S 5354.18 E 2477.38 112.54 2587.69 110.31 2700.81 113.12 2815.82 115.01 2926.34 110.52 8875.44 5846.20 5800.00 9072.32 5946.20 5900.00 9271.95 6046.20 6000.00 9473.54 6146.20 6100.00 9680.23 6246.20 6200.00 2122.58 S 5518.63 E 2183.72 S 5676.82 E 2240.71 S 5839.92 E 2302.13 S 6003.83 E 2362.92 S 6174.17 E 3029.24 102.90 3126.12 96.88 3225.75 99.63 3327.34 101.59 3434.03 106.69 9894.98 6346.20 6300.00 10114.50 6446.20 6400.00 10338.56 6546.20 6500.00 10559.73 6646.20 6600.00 10795.57 6746.20 6700.00 2425.73 S 6353.52 E 2483.98 S 6540.02 E 2542.58 S 6731.76 E 2601.97 S 6919.86 E 2668.06 S 7122.96 E 3548.78 114.75 3668.30 119.52 3792.36 124.06 3913.53 121.17 4049.37 135.84 11023.27 6846.20 6800.00 11240.97 6946.20 6900.00 11458.71 7046.20 7000.00 11668.65 7146.20 7100.00 11877.32 7246.20 7200.00 2732.20 S 7317.16 E 2801.67 S 7497.62,E 2870.57 S 7678.29 E 2930.06 S 7853.03 E 2988.59 S 8026.54 E 4177.07 127.70 4294.77 117.71 4412.51 117.73 4522.45 109.94 4631.12 108.67 12086.91 7346.20 7300.00 12294.28 7446.20 7400.00 12500.61 7546.20 7500.00 12706.29 7646.20 7600.00 12909.13 7746.20 7700.00 3056.57 S 8197.70 E 3120.54 S 8367.72 E 3182.78 S 8537.11 E 3241.57 S 8706.97 E 3299.04 S 8873.82 E 4740.71 109.59 4848.08 107.37 4954.41 106.32 5060.09 105.69 5162.93 102.84 13109.16 7846.20 7800.00 13300.30 7946.20 7900.00 13482.85 8046.20 8000.00 13661.84 8146.20 8100.00 13837.28 8246.20 8200.00 3351.77 S 9038.80 E 3411.17 S 9190.42 E 3469.63 S 9331.51 E 3524.77 S 9469.33 E 3571.46 S 9605.70 E 5262.96 100.02 5354.10 91.14 5436.65 82.55 5515.64 78.99 5591.08 75.44 14010.35 8346.20 8300.00 3620.72 S 9738.06 E 5664.15 73.07 SPEt -SUN DRILLING SERVICES A_NCHOP3AGE ALASKA PAGE ARCO ALASKA, INC. POINT MCINTYRE / P2-45A 500292276901 NORTH SLOPE BOROUGH COMPUTATION DATE: 9/23/97 DATE OF SURVEY: 090497 JOB NUMBER: AK-MM-70249 KELLY BUSHING ELEV. = 46.20 FT. OPERATOR: ARCO ALASKA, INC. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 14183.32 8446.20 8400.00 3668.15 S 9870.95 E 5737.12 72.98 14356.84 8546.20 8500.00 3711.82 S 10005.87 E 5810.64 73.52 14523.55 8646.20 8600.00 3755.59 S 10131.82 E 5877.35 66.71 14684.75 8746.20 8700.00 3799.37 S 10250.42 E 5938.55 61.20 14845.74 8846.20 8800.00 3841.29 S 10369.41 E 5999.54 60.98 15007.25 8946.20 8900.00 3884.17 S 10488.77 E 6061.05 61.52 15168.27 9046.20 9000.00 3921.87 S 10609.20 E 6122.07 61.01 15333.77 9146.20 9100.00 3960.90 S 10735.16 E 6187.57 65.50 15361.55 9162.72 9116.52 3967.38 S 10756.53 E 6198.83 11.26 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS 0 !::! I I--i_ I I%1G S ~:: I:! ~/I ~' E S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 November 13, 1997 MWD Formation Evaluation Logs P2-45A, AK-MM-70249 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Y~rn Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 P2-45A: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-22769-01 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-22769-01 2"x 5" MD Neutron & Density Logs: 50-029-22769-01 2"x 5" TVD Neutron & Density Logs: 50-029-22769-01 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, A~aska 99518 · (907) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN' Sherrie NO. 11459 Company: Field: Alaska Oil & Gas Cons Corem Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Greater Point Mclntyre Area 10/17/97 Floppy Well Job if Log Description Date BL RF Sepia Disk P2-45A ~ "~1'~{::) 97475 CET(PDC) 970922 I I 1 .... ,, SIGNED' _~~ ~ DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. 1997 Anchorage D I~! I i_1_ I I~ (3 September 29, 1997 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data P2-45A Dear Ms. Taylor: Enclosed are two hard copies of the above mentioned file(s). Well P2-45A MWD survey Tie-In point at 7001.00', Window point at 7042.00' and a Projected survey at 15,417.00'. Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachments OCT 0 1 1997 0i~ & Gas r~ns. C0mrrU~0.~ Anchorage- 5631 Silverado Way, Suite G · Anchorage, AJaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Ino. Company spenn -sun WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs September 17, 1997 X-33 AK-MW-60159 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ylm Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. RECEIVED APl#: 50-029-22699-00. s Ep 1,99 Alaska 0ii & G~ ¢~ns, C~mmis~t,¢ Note: This Data is replacement data for your database, which was previously dism~buted on March 19, 1997. This is due to a change (suggested by B.P.) in a reference curve to depth shit~ Sperry-Suns MWD data. The MWD data was depth shif~ed as much as +/- 20 feet. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Inc. Company TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE '- ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 July 31. 1997 Steve Shultz Engineering Supervisor ARCO Alaska. Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Point Mclntyre P2-45A ARCO Alaska. Inc. Permit No. 97-144 Sur. Loc.' 398'SNL. 1296'EWL. Sec. 14. T12N, R14E. UM Btmnhole Loc.: 777'NSL, 3152'WEL. Sec. 18, T12N, R15E. UM Dear Mr. Shultz: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you t¥om obtaining additional permits required bx' law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to ~vitness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. ~I~iZI Johnsto BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game. Habitat Section xv/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASK/. ulL AND GAS CONSERVATION CO,,,.vllSSlON PERMIT TO DRILL 20 AAC 25.005 11a. Type of work [] Drill [] Redrill lb. Type of Well [] Exploratory [] Stratigraphic Test [] Development Oil ' [] Re-Entry [] Deepen [] Service [] Development Gas 1-1Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska Inc. KBE = 45.3' Point Mclntyre 3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 034627 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 398' SNL, 1296' EWL, SEC. 14, T12N, R14E, UM Point Mclntyre At top of productive interval 8. Well Number Number U-630610 958' NSL, 3614' WEL, SEC. 18, T12N, R15E, UM P2-45A At total depth 9. Approximate spud date Amount $200,000.00 777' NSL, 3152' WEL, SEC. 18, T12N, R15E, UM 08/03/97 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 034624, 1661't No Close Approach 2560 15682' MD / 9415' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e)(2)} Kick Off Depth 7042' MD Maximum Hole Angle 62° Maximum surface 3595 psig, At total depth (TVD) 8800' / 4475 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 8-1/2" 7" 26# L-80 BTCM/NSCC 14691' 43' 43' 14734' 8803' 379 SX Class 'G' 8-1/2" 7" 29# 13CR BTCM/NSCC 637' 14734' 8803' 15371' 9215' 8-1/2" 7" 29# b-80 BTCM/NSCC 311' 15371' 9215' 15682' 9415' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 15064 feet Plugs (measured) Abandonment Cement Plugs: 14863'-14363', 7900'-7500', true vertical 9112 feet 7500'~6618' Effective depth: measured 6618 feet Junk (measured) Top of Fish at 14863' true vertical 4759 feet Casing Length Size Cemented M D TVD Structural Conductor 80' 20" 260 sx Arcticset I (Approx.) 110' 110' Surface 6958' 9-5/8" 1761 sx Cold Set III, 644 sx 'G' 6992' 4951' IF~;°e rdmu cetdi '°ant e P~'~ Liner jul_. £ 5 1997 Perforation depth: measured N/A0RI$1NAL_Alaska.0ila6asC0ns. true vertical Anchorage 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Greg Hobbs, 564-4191 Prepared By Name/Number: Kathy Campoamor, 564-5122 '21. I hereby certify that thews t~~to~~----'-Z~ ~"5~ the best of my knowledge Signed Steve Shultz ' Title Senior Drilling Engineer Date / '""~ Commission Use Only ..... Permit Number APl Number I Approval Date I See cover letter ~;~7--,,/,¢.//~-~ 50- 0-~ '~'--. .?_. ;2.. ~'~' '~ ~',¢, /] '"~-~.,/-~"¢] forother requirements Conditions of Approval: Samples Required []Yes J~ No Mud Log Required [~]Yes ,~_ No Hydrogen Sulfide Measures r~Yes [] No Directional Survey Required IXIYes[~No Required Working Pressure for BOPE 1-12M; 1--13M; ]~]5M; I--I10M; I-I15M Other: J Original ,51gll~u by order of Approved By Form 10-401 Rev. 12-01-85 Submit In Triplicate [Well Name: [ P2-45A Type of Well (producer or injector): IProducer I Surface Location: 398' FNL, 1296' FWL, SEC 14, T12N, R14E Target Location: 958' FSL, 3614' FEL, SEC 18, T12N, R15E Bottom Hole Location: 777' FSL, 3152' FEL, SEC 18, T12N, R15E I AFE Number: 12B0212 I I Estimated Start Date: 8/3/97 I mo: 115682' I TW: Well Design (conventional, slimhole, etc.): I Rig: I DOYON 14 I Days to complete I 15 19415'brt I IRTE: 145'4 I Ultra-Slimhole 7" Longstring Formation Markers: Formation Tops MD TVD(rkb) Base of Permafrost 1833 1780 SV1 (T3) 6574 4725 9 5/8" Casing Point 6991 4939 9-5/8" csg shoe below SV1 & above K-15 K15 (Ugnu) 7400 5150 West Sak 11279 6925 9.5 ppg minimum mud weight required K-10 14275 8511 HRZ 14723 8798 K-5/HRZ same depth, 9.6-9.9 ppg EMW Kalubik 14933 8933 Kupamk 15034 8998 10.5 ppg Min EMW OWC 15214 9114 Field OWC. Observed at 15,143' MD. Miluveach 15371 9215 Will Drill Miluveach if Sonic Requested. TD 15682 9415 7" casing shoe. 200' TVD in Miluveach Casing~ru ~ing Program: HoleS~ize C~g/Tb~ Wt/Ft Grade Conn Length Top Btm O.D. mrrvD mrrvm 30" 20" 133# H40 BTC 80' 45/45' 125'/125I 12 1/4" 9 5/8" 40g L-80 BTC-Mod 6947' 44/44' 6991'/4939"~ 8 1/2" 7" 26g L-80/ BTCM / NSCC 14691' 43/43' 14734'/88_~3~ 29# 13CR/ 637' 14734'/8803' 15371'/92~' ~ 29# L-80 311' 15371'/9215 15682'/94~ Tubing 4 1/2" 12.6g 13CR80 NSCT 14892' 42¥42' 14934'/893~ Mud Program: Production Mud Properties: LSND ] 8 1/2" hole section Density (ppg) I Plastic Vis I ,ela ~o,n~ 10 sec gel I 10 min gel pH 4-8I < 30 9.0-9.5 Fluid Loss I 6-12cc Production Mud Properties: 6% KCL I Density (ppg) I Plastic Vis I Yield Point 10.5 I 8-15 I 15-25 18-1/2" hole section I 10 sec gel I10 min gel '8-15 < 30 pH 9.O-9.5 Fluid Loss 4-6cc Cement Data: Casing]Liner Lead:SxsFvVt/Yield Tail: Sxs/Wt~ield Comments 7" none 379/15.8/1.14 Class "G". Volume based on cement to 1500' (per asset) above the Kupamk with 50% excess + 80' shoe. Logging Program: I Open Hole Logs: I Cased Hole Logs: 12 1/4" N/A 8 1/2" MWD DIR to 14275' MD 8-1/2" LWD DIR/GR/RES/DEN/NEUT 14275'-TD No Openhole Logs GR/CBT/Sonic/Gyro Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. BOPE and drilling fluid system schematics on file with AOGCC. Waiver for Diverter System Approved by State (dated 4/18/97). Diverter not needed on this ST. Directional: KOP: Maximum Hole Angle: Close Approach Wells: 7042' MD None (Surface casing already set.) 62 degrees Drilling and Completion Scope 1. MIRU D-14 on well P2-45. 2. 3. Remove TWC. N/D Tree, NFU BOP's Drill 8-1/2" production hole out of 9 5/8" casing. drill per directional program to 14275' MD. Change over mud system to 6% KCL. Kick-off cement plug at 7042' with MWD DIR and . 5. Drill 8-1/2" production hole with LWD DIR/GR/RES/DEN/NEU to TD at 15682' MD. 6. Run and cement 7" L-80 26#/13CR 29#/L-80 29# casing. 7. Run Wireline Sonic Log and possibly CBT and Gyro to TD. 8. Run 4-1/2" 13CR production tubing with 7"x4-1/2" packer, 4-1/2" SSSV, and 4-1/2"x1" GLMs. 9. Secure well, RDMO. 10. Production may choose to run the CBT post rig-move. Drilling Hazards/Continge ,cies · The original reservoir pressure is 4350 psi at 8800' ss. The expected reservoir pressure is 4475 psi at 8800' ss. This is an isolated fault block. The potential for higher pressure exists. The 10.5 ppg mud will handle the pressure as it did in the original bore. · The drilling of the original P2-45 provided a smooth wellbore, and the 10.5 ppg 6% mud held the shales (including the Miluveach) in check. The undoing of the well was a mechanical drillpipe part that was compounded by other issues. With a new drillstring, and attention to the hole, this bore is anticipated to go well. If high torque is encountered while drilling the HRZ, the Kuparuk will be topset, and the well completed with 6" hole from 3.5" drillstring. · Tight hole has been experienced in the lower Sagavanirktok, below the surface casing shoe which were set into the SV4 sand. This has caused stuck pipe incidents and bit/BHA balling Gumbo problems. · Coal stringers in the lower Ugnu have caused stuck pipe. These were encountered on P2-25 and jarred out of. · No major instances of lost circulation problems have occurred on Pt Mac 2 wells. Disposal · Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. · Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough. GH 7/22/97 Shared Services Drilling[ S)ru¢lure: Pt Mac 2 Well: P2-45 Field: Point bloc Location :Alaska Scale 1 ' 1000.00 East -> -1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 o 4000 5 600 c- ~ 6400 7200 II V 8800 I I ! ! I I l.. I I I I I I I I I I I, I I I ,i I I I i 9600 ! O4O0 LggKick of! Po~nt 61..~ Erid o¢Suild ~arqel 5o.o~ End al Orop 16725'MD ,'kid TO.7* Lir~er' 15682'bid I I I I I I I I I J I I I I I I I I I I I I I I I I I I ! I 5200 4000 4800 5600 6400 7200 8000 8800 9600 10400 t 1200 $2000 12800 13600 14-400 15200 1000 - 0 ---1000 - --5000 7 0 -'4000 ~1- _ ZY --5000 --6000 - .. - --7000 f- Z Scale 1 ' 800. O0 Verlkal Section on 110.46 ozlmulh with relerence O.OO N, 0.00 £ from PZ-45 r~ P2-45 ST2 Wp1 ~erticd Se~lon 110.46 MD Inc. Azi, TVDss 'rVDrkb RecL Coordinates 6~id Coordinates DIS Vertical Northiag Eastin9 Eastiag Northing deoJ100ftSection 7042.00 59.74 115.83 4930.88 4976,18 1544.35s 4012,81e 685589.96 5996734.77 0.00 4299,51 7100.00 60,17 114.59 4959.92 5005.22 t565.74s 4058.24e 685635.87 5996714,45 2,00 4349.54 7200,00 60.94 112,47 5009.08 5054.38 1600,50s 4138,08e 685716.49 5996681.57 2.00 4436.49 7300.00 61.75 110,38 5057.03 '5102.33 1632.55s 4219,76e 685798.90 5996651.45 2.00 4524.23 7331.15 62.00 109.74 5071.72 5117.02 1641.97s 4245.56e 685824,91 5996642.63 2,00 4551.69 7400.00 62.00 109,74 5104,04 5149.34 1662,50s 4302.79e 685882,60 5996623.44 0.00 46t2.48 7500.00 62.00 109,74 5150.98 51.96.28 1692.33s 4385,90e 685966.37 5996595.58 0.00 4700.78 7600.00 62.00 109,74 5197.92 5243.22 1722.15s 4469,01e 686050.15 5996567,71 0.08 4789',07 7700.00 62.00 109,74 5244.86 5290,16 1751.97s 4552.12e 686133:93 5996539.84 0.00 4877.36 7800.00 62.00 109,74 5291,80 5337,10 1781,79s 4635,22e 686217.71 5996511,97 0,00 4965,65 7900.00 62.00 109.74 5338.75 5384,05 1811,61s 4718.33e 686301,49 5996484.10 0.00 5053.94 8000.00 62.00 109.74 5385,69 5430,99 1841,44s 4801,44e' 686385.27 5996456,24 0.00 5142,23 8100,00 62,00 109,74 5432,63 5477,93 1871,26s 4884,55e 686469.05 5996428,37 0,0O 5230,52 8200.00 62:00 109.74 5479.57 5524,87 1901,08s ¢967.66e 686552,82 5996400,50 0.00 5318,81 B300,O0 62,00 109,74 5526,51 5571,81 1930,90s 5050.77e 686636;00 5996372,63 0,00 5407,10 8400.00 62.00 109,74 5573.45 5618,75 1960,72s 5133,88e 686720.38 5996344,76 0,00 5495,39 8500,00 62,00 109.74 5620,40 5665,70 1990.55s 5216.99e 686804,16 5996316.90 0,0O 5583,68 8600.00 62,00 109,74 5667,34 5712,64 2020.37s 5300.10e 686887,94 5996289.03 0,00 5671,97 8700,00 62,00 109,74 5714,28 5759.58 2050.19s 5383.21e 686971.72 5996261,16 0.00 5760.27 8800,00 62,00 109.74 5761,22 5806,52 2080.01s 5466.32e 687055.50 5996233.29 0.00 5948.56 8900.00 62.00 109.74 5808.16 5853.46 2108.83s 5549.43e 687139.27 5996205,42 0.00 5936.85 9000.00 62.1)0 109,74 5855.10 5900,40 2139.66s 5632.54e 687223,05 599617756 0.00 6025.14 9100.00 62.00 109.74 5902.05 5947,35 2169.48s 5715.65e 687306.83 5996149.69 0.00 6113.43 9200.00 62.00 109.74 5948.99 5994.29 2199.30s 5798.75e 687390.61 5996121.82 0.00 6201,72 9300.00 62.00 109,74 5995.93 6041.23 2229.12s 5881.B6e 687474.39 5996093.95 0.00 6290.01 9400.00 62.00 109.74 6042.87 6088.17 2258.94s 5964.97e 687558.17 5996066.08 0.00 6378.30 9500.00 62.00 109.74 6089.81 6135.11 2288.77s 6048.08e 687641,94 5996038,22 0.00 646859 9000.00 62.00 109.74 6136.75 6182.05 2318.59s 6131.19e 687725,72 5996010.35 0.00 6554,88 9700.00 62.00 109.74 6183.70 6229,00 2348,41s 6214,30e 687809.50 5995982.48 0.00 6643.17 9800.00 62.00 109,74 6230.64 6275.94 2378,23s 6297,41e 687893.38 5995954,61 0.00 6731.47 9900.00 62.00 109,74 6277.58 6322,88 2408.05s 6380.52e 687977.06 5995926.74 0,00 6819.76 10080.00 62.00 109.74 6324.52 6369.82 2437.88s 6463.63e 688060.84 5995898.68 0.00 6908.05 1010O.00 62.08 109.74 6371.46 6416.76 2467.70s 6546.74e 688144.62 5995871.01 0,08 6996.34 10200.00 62.00 109.74 6418.41 6463.71 2497.52s 6629.85e 688228.39 5995843.14 0.00 7084,63 10300.00 62,00 109.74 6465.35 6510.65 2527.34s 6712.96e 688._312.17 5995815.27 0.00 7172.92 10400.00 62.00 109.74 6512.29 6557.59 2557.16s 6796.07e 688395.95 5995787.40 0.0O 7261,21 10500.00 62.00 109.74 6559.23 6604,53 2rJ86.99s 6879.17e 688479.73 5995759.54 0.00 7349,50 10600.00 62.00 109.74 6606.17 6651.47 2616.81s 6962,28e 688563.51 5995731.67 0.0O 7437.79 10700.00 62,0O 109,74 6653.11 6698.41 2646.63s 7045.39e 688647.~ 5995703.80 0.00 7526.08 7/22/97 4:46 PM Page 1 of 3 Comment 2-45 ST2 Wp1 ellica~ Seclioll 110.46 KB 45 MD Inc. Azi, TVDss TVDrkb RecL Coordinates Grid Coordinates OLS Vertical Northing EasUng Eastin9 Northing degflgOftSection 10800,00 62.00 109.74 6700.06 6745,36 2676.45S 7128,50e 688731,07 5995675.93 0.00 7614.37 10900,00 62.00 109,74 6747.00 6792.30 2706.27s 7211,61e 688814.84 5995648.06 0.00 7702.66 11000.00 62.00 109,74 6793,94 6839.24 2736.10s 7294.72e 688898.62 5995620,20 0.00 7790.96 11100,00 62.00 109.74 6840,88 6886.18 2765.92S 7377,83e 688982.,40 5995592,33 0.O0 7879.25 11200.00 62.00 109.74 6887.82 6933,12 2795.74S 7460.94e 689066,18 5995564,46 0,00 7967,54 11300,00 62.00 109,74 6934.76 6980.06 2825.56S 7544.05e 689149.96 5995536.59 O.O0 805533 11400,00 62.00 109,74 6981.71 7027.01 2855.,38s 7627.16e 689233.74 5995508.72 0.O0 8144,12 11500.00 62.00 109.74 7028,65 7073.95 2885.21s 7710.27e 689317.51 5995480,86 0.O0 8232.41 11600,00 62.00 109.74 7075,59 7120,89 2915.03s 7793,38e 689401.29 5995452.99 0.,00 8320.70 11700.00 62.00 109.74 7122.53 7167.83 2944.85s 7876.49e 689485.07 5995425.12 0,,00 6408.99 11800.00 62.00 109.74 7169.47 7214.77 2974.67S 7959.60e 689568.65 5995397.25 0.00 8497.28 11900.00 62.00 109.74 7216.41 7261.71 301N.49s 8042.70e 608652.63 5995369.38 0.00 8585.57 12000.00 62.00 109.74 7263.36 7308.66 3034,32s 8125.81e 689736.41 5995341.52 0.00 8673.86 12100.00 62.00 109.74 7310.30 7355.60 3064.14s 8208.92e 689820.19 5995313.65 0.00 8762.15 12200.00 62.00 109.74 7357.24 7402,54 3093.96s 8292.03e 689903.96 5995285.78 0.00 8850.45 12300.00 62.00 109.74 7404.18 7449.48 3123.78s 8375.14e 689987.74 5995257.91 0.00 8938.74 12400,00 62.00 109.74 7451.12 7496.42 3153,60s 8458.25e 690071.52 5995230.04 O. O0 9027.03 12500.00 62.00 109.74 7498.06 7543.36 . 3183.43s 8541.36e 690155.30 5995202,18 0.00 9115,32 12600.00 62.00 109.74 7545.01 7590,31 321325s 8624,47e 690239.08 5995174.31 0.00 9203,61 12700.00 62.00 109.74 7591,95 7637.25 3243.07s 8707.58e 690322.86 5995146.44 0,00 9291.90 12800.00 62,00 109.74 7638.89 7684.19 3272.89s 8790.69e 690406.63 5995118.57 0~00 9380.19 12900.00 62.00 109.74 7685.83 7731,13 3302.71s 8873,80e 690490.41 5995090.70 0.00 9468.48 13000.00 62.00 109.74 7732.77 7778,07 3332.54s 8956,91e 690574,19 5995062,84 0.1)13 9556.77 13100.00 62.00 109.74 7779.72 7825.02 3362,3Es 9040,02e 690657.97 5995034.97 0.00 9645,06 13200.00 62,00 109,74 7626.66 7871.96 33.q2,18s 9123,13e 690741.75 5995007.10 0.00 9733,35 13207.40 62.00 109.74 7830,13 7875,43 3394.39s 9129.28a 690747.95 5995005.04 0.00 9739,89 13300,00 60.16 109.93 7874.91 7920.21 3421.89s 9205.52e 690824,81 5994979.33 2.00 9820.93 13400,00 58.17 110.15 7926.16 7971,46 3451.31s 9286.18e 690906.13 5994951.81 2.00 9906.79 13500.00 56.18 110.37 7980.37 8025.67 3480.40s 9365.01e 690985.61 5994924,56 2.00 9990,82 13800,00 54.19 110.61 8037.47 8082.77 3509.14s 9441.90e 691063.15 5994897.63 2.'00 10072,91 13700,00 52.20 110.86 8097.38 8142.68 3537.48s 9516.78e 691138.67 5994871.05 2.00 10152.97 13800.00 50.21 111.12 8160.03 8205,33 3565.40s 9589.54e 691212.06 5994844.85 2.00 10230.89 13810.39 50.00 111.15 8166.70 621290 3568.27s 9596.98e 691219.56 5994842.15 ZOO 10238.87 13900.00 50.00 111.15 8224,30 8269.60 35..q3.04s 9661,00e 691284.13 5994818.89 0.00 10307,51 14000.00 50.00 111.15 8288.58 8333,88 3620,68s 9732,44e 691356.20 5994792.93 0.00 10384.10 14100.00 50.00 111,15 8352.86 8398,16 3648,32s 9803.88e 691428.27 5994766.97 0.00 10460.70 14200,00 50.00 111.15 8417.13 8462.43 3675.96s 9875.33e 691500.33 5994741.01 0.00 10537.30 14300.00 50.00 111.15 8481,41 8526.71 3703.60s 9946.77e 691572.40 5994715.05 0.00 10613.90 14400.00 50.00 111,15 8545.69 8590.99 3731.24s 10018.22e 691644,47 5994689,09 0.00 10690.50 7/22/97 4:46 PM Page 2 of 3 Comment P2-45 ST2 Vertical Section li0.46 RKB 45.30 MD Inc. AzJ. TVOss TVDrkb Rect. Cm3rdinates Grid Coordinates DLS Vertical Norlhing Easting Easting Nmlhing deg/10OftSectbr~ Comment 14500.00 50,00 1ti.15 8609,97 8655.27 37fiS.88s10089.6Ge 691716.$3 5994653.13 0.00 10767,10 14600.00 50,00 111.15 8574,25 8719.55 3786,52s 10161.11e 691788.60 5994637,17 0.00 10843.70 14700.00 50,0{) 111.15 8736,53 8763.83 3814.16s 10232:55e 691860.67 5994611.21 0.00 10920.30 14722.51 50.00 111.15 6753.00 6798,30 3820.38s 10248.63e 69187G.B9 5994605.37 0.00 10937,54 HRZ (ls! w~ap0: 14723'MD 14800.00 50,00 111.15 8802.81 8848,11 3841.80s 10303.99e 691932,73 5994585,25 0.00 10996.90 14881.20 50.00 111.15 8855.00 8900.30 3864.24s 1D362.01e 691991.25 5994564,18 0.00 11059.09 HFIZ(2nd wrap): 14881'M0 14900.00 50.00 111.15 8867,09 8912.39 3869.44s 10375.44e 692004.80 5994559.30 0.00 11073.49 14932.54 50.00 111.15 8888.00 8933.30 3878.43s 10398.68e 692028.25 5994550.85 0.00 11098.42 Kalubik' 14933'MD 15000,00 50.00 111.15 8931.36 8976.66 3897.08s 10446.88e 692076.86 5994533.34 0.00 11150.09 15032.10 50.00 111.15 8952.00 8997.30 3905.95s 10469.82e 692100.00 5994525.00 0.00 11174.68 P2-455t2Target 15033.66 50.00 111.15 6953.00 8998.30 3906.38s 10470.93e 692101.12 5994524.60 0.00 11175,.68 TopKuparuk TARGET: 15034'MD 15100.00 50,00 111.15 8995.64 90~.94 3924.72s 10518.33e 692148.~3 5994507,38 0.00 11226.,69 15142.56 60.00 111,15 9023.00 9068.30 3936.48s 10548.73e 692179.60 5994496.33 0.00 11259.29 WOC (observed): 15143'MD 15200.00 50.00 111.15 9059.92 9105.22 3952.36s 10589.77e 692221.00 5994481.42 0.00 11303.29 15214.12 50.00 111.15 9069.00 9114.30 3956.26s 10599,.86e 692231.18 5994477.75 0.00 11314.11 WOC (field ref): 15214°MD 15300.00 50.00 111.15 9124.20 9169.50 3980,00s 10661.22e 692293.06 5994455.46 0.00 11379.89 15371,25 50.00 111.15 9170.00 9215,30 3999,69s 10712.12e 692344,41 5984436.96 0,00 11434.47 Miluveach' 153'/1'MD 15400,00 50.00 111.15 9188.48 9233,78 4007,64s 10732.68e 692365.13 5994429,50 0,00 11456.49 15500.00 50.00 111.15 9252.76 9298.06 4035.28s 10804.10e 692437,20 5994403.54 0.00 11533.09 15600.00 50,00 111,15 9317.04 9362,34 4062.92s 10875.55e 692509.26 5994377.56 0.00 11609.69 15682.40 50.00 111.15 9370.00 9415.30 4085.69s 10934.42e 692568.64 5994356.19 0,00 11672.80 TD 7' Uner: 15682'MD 7t22/97 4:46 PM Page 3 of 3 TREE: 4-1/16" - 5M chrome P2 45A WELLHEAD: 11" X 11" - 5M FMC ~ GL-SL = 11.6' Gen 5 Type ....... .................... ::;:::!~:m~::.~:~::~ _ w 4-1/2" BAL-O 2100 4000'- 9-5/8", 40#/fi, L-80 I 6991' __ i k BTC ..................... ........................... ! i~i:ii'~:'~':'i;~i';:;;:;:;:;:~ (3AS LII-I MANDRELS I KOP: 400' ~ ~:~;;;::i:,:.:~;i:::i:!:!:!:! (Camco 4-1/2xl "KG B-2-LS") MAX ANGLE: 62° @ 7331' MD ~ N° MD(BKB) TVDss I o3 1 tbd 4-1/2" 12.$# 13 Cr NSCT TUBING ..... ! 4 ,, TUBING ID: 3.958" CAPACITY: 0.01522 BBL/FT ~:;,.;i:m~:~,~:i:: 6 " 40' MD above ?,~ii~:ii'i:ii : packer ....................... PEFIFOFIATION SUMM~FI¥: Ref Log: Size Interval SPF Open/Sqzd ....... .................. ~ --TOP OF CHROME 7" = 14734' L-80 Mod BTC / 13CR NSCT .... · : .: :::::::::::: · -..: .;......:. ;..; ............ · ..~ ~:~ ~:~:~:~:~:::~:~:::::~:;:::::?: :'"'.' ........ ~ ::(~,i?i::~:?:i:i!ii!.i~:'ii~ _ 7" Packer, OCr 14004' llii~.ii:;i?:i;iil -- - 4- ~/2" 'x' Nipple l::..E;:.::il ~ .. 4-1/2" 'XN' Nipple ~'- 4-1/2" WLEG 14934' m 7" CHROME TO TOP MILUVEACH M^RKER dOl~'l' (20') ABOVE 7" L-go from TOP MILUVEACH to ID KUPARUK BUT BELOW TI'. 7" shoe at I 15682' I a k DATE REV. BY COMMENTS Point Mclntyre WELL: P2-45 7/23/97 GH PLANNED COMPLETION APl NO: 50-029- Shared Services Drilling STATE' O.F ALASKA ALASKA ...,L AND GAS CONSERVATION COMIVllSSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other "' [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator ARCO Alaska Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 398' SNL, 1296' EWL, SEC. 14, T12N, R14E, UM At top of productive interval N/A At effective depth 1793' SNL, 4977' EWL, SEC. 14, T12N, R14E, UM At total depth 4559' SNL, 1117' EWL, SEC. 18, T12N, R15E, UM 5. Type of well: [~ Development r-] Exploratory r-] Stratigraphic I--IService 6. Datum Elevation (DF or KB) KBE = 45.3' 7. Unit or Property Name Point Mclntyre 8. Well Number P2-45 9. Permit Number 97-94 / 397-118 10. APl Number 50-029-22769 1. Field and Pool Point Mclntyre 12. Present well condition summary Total depth: measured 15064 feet true vertical 9112 feet Effective depth: measured 6618 feet true vertical 4759 feet Casing Length Size Structural Conductor Surface Intermediate Production Liner 80' 20" 6958' 9-5/8" Plugs (measured) Junk (measured) Abandonment Cement Plugs: #1 from 14863'-14363'; #2 from 7900'-7500': #3 from 7500'-6618' Top of Fish at 14863' Cemented 260 sx Arcticset I (Approx.) 1761 sx Cold Set III, 644 sx 'G' MD TVD 110' 110' 6992' 4951' Perforation depth: measured None true vertical Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None 13. Attachments [~ Description summary of proposal [--I Detailed operations program [--] BOP sketch 14. Estimated date for commencing operation August 1, 1997 16. If proposal was verbally approved Name of approver Date approved Contact Engineer Name/Number: Greg Hobbs, 564-4191 I15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Prepared By Name/Number: Kathy Campoarnor, 564-5122 17' I hereby certify that t,~z~in,~ ii~ndsigned ~--- _ ~.~ correct to the best of my knowledge Steve Shultz /(¢/ '"'" '~ Title Senior Drilling Engineer Commission Use Only Date ~/~.~/¢ ~7 Conditions of Approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance Mechanical Integrity Test__ Subsequent form required 10- I Approval No. Approved by order of the Commission Commissioner Date Form 10-403 Rev. 06/15/88 Submit In Triplicate · WELL PERMIT CHECKLIST COMPANY ~~ WELL NAME~.~ ~,~)~,~'_/z~-~ROGRAM: exp [] dev~edrll~serv [] wellbore segU ann disposal para req FIELD & POOL ~'~'~'//('_.)/") INIT CLASS ~-----~'"' .,'2'~¢' ? GEnE A~EA/' (:~,~' ~..) UNIT# ,/'/~'.~'~> ON/OFF SHORE _ ~ ADMINISTRATION 1. Permit fee attached ....................... N 2. Lease number appropriate .................... N 3. Unique well name and number .................. N 4. Well located in a defined pool .................... N 5. Well located proper distance from drilling unit boundary .... N 6. Well located proper distance from other wells' .......... N 7. Sufficient acreage available in drilling unit ............ N 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. /YiN 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING DATE 14. Conductor string provided ................... N 15. Surface casing protects all known USDWs ........... N 16. CMT vol adequate to circulate on conductor & surf csg ..... N 17. CMT vol adequate to tie-in long string to surf csg ........ N 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... Y N 22. Adequate wellbore separation proposed ............. '(.~ N 23. If diverter required, does it meet regulations .......... ~Y N 24. Drilling fluid program schematic & equip list adequate ..... (,~ N 25. BOPEs, do they meet regulation ................ N 26. BOPE press rating appropriate; test to ~.~'©qSO psig. (~N 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures ..... .y.y.N./,~N ' 31. Data presented on potential overpressure zones ....... Y 32. Seismic analysis of shallow gas zones ............. /Y/'N N 33. Seabed condition survey (if off-shore) ............. N 34. Contact name/phone for weeklypro~ress reDods ...... /f. Y [explora'~ory only] REMARKS GEOLOGY: ENGINEERING: COMMISSION: B EW~Q~, r/z DWJ~ JDH ~ RNC Comments/Instructions: HOW/lit - A:\FORMS\cheklist rev 07/97 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER . ****************************** . ............................ * ....... SCHLUMBERGER ....... . ............................ COMPANY NA~E : ARCO ALASKA, INC. WELL NAME : P2-45A FIELD NAM~ : POINT MCINTYRE BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22769-01 REFERENCE NO : 97475 Date_ LIS Tape Verification Listing Sc~hlumberger Alaska Computing Center 14-0CT-1997 16:38 PAGE: **** REEL HEADER **** SERVICE NA~E : EDIT DATE : 97/10/14 ORIGIN : FLIC REEL NA~E : 97475 CONTINUATION # : PREVIOUS REEL : CO~9~Ff : ARCO ALASKA INC, P2-45A, POINT MCINTYRE ,API #50-029-22769-01 **** TAPE HEADER **** SERVICE NA~iE : EDIT DATE : 97/10/14 ORIGIN : FLIC TAPE NA~iE : 97475 CONTINUATION # : 1 PREVIOUS TAPE .. COIV~VZENT : ARCO ALASKA INC, P2-45A, POINT MCINTYRE ,API #50-029-22769-01 TAPE HEADER POINT MCINTYRE CASED HOLE WIRELINE LOGS WELL NAME: P2-45A API NUM~ER: 500292276901 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 14-0CT-97 JOB NUblBER: 97475 LOGGING ENGINEER: PAWLUK OPERATOR WITNESS: M. REYNOLDS SURFACE LOCATION SECTION: 14 TOWNSHIP: 12N RANGE: 14E F1FL: 398 FSL: FEL: FWL: 1296 ELEVATION(FT FROM MSL O) KELLY BUSHING: 46.20 DERRICK FLOOR: 44.70 GROUND LEVEL: 10.80 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 7. 000 15505.0 29. O0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:38 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: NONE LDWG CURVE CODE: RUN NUFiBER.. PASS ~ER : DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH No depth adjustments were made to this data set because this IS the Primary Depth Control log for this well. $ $ PAGE: **** FILE HEADER **** FILE NAFiE : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE AVt~4BER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS--ER: 1 DEPTH INCRESIEAVT: 0.5000 FILE SDT~4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 15215.0 14936.0 $ CURVE SHIFT DATA - PASS TO PASS (24~ASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: NONE PASS ~ER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH REF~JU~S: NO DEPTH SHIFTING APPLIED ON THIS CASED HOLE LOG. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:38 PAGE: LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 8 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 128 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088211 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH GR GAPI 1088211 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 15215. 000 GRCH. GR 21. 527 DEPT. 14936.000 GRCH. GR 97.206 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:38 PAGE: **** FILE TRAILER **** FILE NAMiE : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NO?4~ER 2 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUM~ER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GRCH 15244.0 $ LOG HEADER DATA STOP DEPTH 14926.5 DATE LOGGED: SOFTWARE VERSION: TI~E LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTENVAL (FT): LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY TCC TELEMETRY CARTRIDGE GR GAMMA RAY GR GAMMA RAY $ 22-SEP-97 8C0-609 1500 22-SEP-97 15321.0 15221.0 14950.0 15215.0 1800.0 NO TOOL NUMBER TCC-B SGT-L CESS-A LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-0CT-1997 16:38 PAGE: BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): 15505.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : BRINE NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 0 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 0 TOOL STANDOFF (IN): REMARKS: TIED INTO MWD DATED 9/5/97 COULD NOT GET PAST 15220. LOGGED UP TO TUBING TAIL CLASS G CEMENT USED HAD TO PUMP TOOL DOWN HOLE AT 2 BBLS/MIN $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 16 LIS Tape Verification Listing SGhlumberger Alaska Computing Center 14-0CT-1997 16:38 PAGE: 6 TYPE REPR CODE VALUE 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 64 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088211 O0 000 O0 0 2 1 1 4 68 0000000000 GR PDC GAPI 1088211 O0 000 O0 0 2 1 1 4 68 0000000000 TENS PDC LB 1088211 O0 000 O0 0 2 1 1 4 68 0000000000 RB PDC DEG 1088211 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 15244. 000 GR. PDC DEPT. 14926. 500 GR. PDC 38.769 TENS.PDC 1549.000 RB.PDC 52.724 TENS.PDC 4417.000 RB.PDC 204.432 109.423 ** END OF DATA ** **** FILE TRAILER **** FILE NA~E : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Sqhlumberger Alaska Computing Center 14-0CT-1997 16:38 PAGE: **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/10/14 ORIGIN : FLIC TAPE NA~iE : 97475 CONTINUATION # : 1 PREVIOUS TAPE : COf~4~NT : ARCO ALASKA INC, P2-45A, POINT MCINTYRE ,API #50-029-22769-01 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/10/14 ORIGIN : FLIC REEL NAME : 97475 CONTINUATION # : PREVIOUS REEL : co~El~r : ARCO ALASKA INC, P2-45A, POINT MCINTYRE ,API #50-029-22769-01