Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-225-Weii 0mPliance Report
File on Left side of folder
197-225-0 PRUDHOE BAY UN WB
Roll #1: Start: Stop Roll #2:
MD [8033_._ TVD 09309 Completion Date:
WB-05A 50- 029-22817-01
Start Stop
10/15/98 Completed Status: P&A
ARCO ALASKA 1NC
Current:
Name Interval
L ADN4-MD 10-14 15200-16800 OH
L ADN4-TVD 10-14 8100-8900 OH
L GR-MD 2-4 BL 4050-7900 CH
L GR-TVD 2-4 BL 3932-6936 CH
L IMPULSE-TVD 10-15 100-9300 OH
L MDIMPULSE COMPO 10-15 100-16900 OH
R SRVY RPT SCHLUM 0-18033 OH
T 8686 1-6 SCHLUM GR/IMP/ADN OH
Daily Well Ops __ -- Are Dry Ditch Samples Required? yes~
Was the well cored? yes no Analysis Description Received? yes(n~
Comments:
Sent Received T/C/D
1/28/98 3/3/98
1/28/98 3/3/98
2/3/98 2/6/98
2/3/98 2/6/98
1/28/98 3/3/98
1/28/98 3/3/98
1/28/98 3/3/98
10/13/98 10/15/98
And Received? yes no
Sample Set #
Wednesday, November 08, 2000 Page 1 of 1
PLQ-GGI):i-= & LOCATION CLEA.~lqCE
State cf Alaska
ALASKA 0iL & GAS CONSERVATION
.~eview the well file, an~-cerumen= cn pluq~/.ng, well head
s uauua, and !oca~icn c!ear~ca - =r~vi~e loc. clear, code.~ ~ ,. _
' .
~ker 'pos= or
Code
~, STATE OF ALASKA ~.~-~
ALASKA OIL AND GAS CONSERVATION COMMISSION
CONFIDENTIAL
Plugged Back for Sidetrack
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [~ Gas I~ Suspended [] Abandoned [~ Service
2. Name of Operator 7. Permit Number
ARCO Alaska Inc. 97-225
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22817-01
4. Location of well at surface ",.~ 9. Unit or Lease Name
105' NSL, 3219' WEL, SEC. 25, T12N, R14E, UM"'~*'~'"'~'~'""~ West Beach State
At top of productive interval I ,_ '~f 10. Well Number
27' NSL, 3415' EWL, SEC. 20, T12N, R15E, UM ~~ ~ WB-05A
At total depth ~ 11. Field and Pool
35' NSL, 4351' EWL, SEC. 20, T12N, R15E, UM Prudhoe Bay Field/West Beach
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
RT = 41'I ADL 034627
12. Date Spudded12/9/97 113' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if OffshOre 116' NO' Of cOmpletiOnsl 2/20/97 10/15/98 N/A MSLI Zero
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost
18033 9309 FTI 8876 5662 FT [~]Yes [-~Not N/A MD t 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD / LWD, GR, RES
23. CASING~ LINER AND CEMENTING RECORD
CASING SEI-rING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO-R-OM SIZE CEMENTING RECORD AMOUNT PULLED
20" 133# H-40 Surface 121' 30" 260 sx Arctic Set (Approx.)
9-5/8" 40# L-80 31' 6630' 12-1/4" 2970 sx PF 'E', 860 sx Class 'G'
7" 26# L-80 6760' 9155' 8-1/2" 122 sx Class 'G'
4-1/2" 12.6# L-80 9041' 12179' 6" Uncemented - Cut Stuck Pipe
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
None N/A
MD TVD MD TVD
ORIGtNAL 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
15600' P&A #1 with 50 Bbls Class 'G'
11980' P&A #2 with 25 Bbls Class 'G'
8876' EZSV at 9007', P&A #3 w/15 Bbls 'G' below, 5 Bbls on top
6699' K/O Plug, 40 Bbls Class 'G'
2"~. "' PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
Not on ProductionI N/A
Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL 'iCHOKE SIZE I GAS-OIL RATIO
TEST PERIOD
!
Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips,
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
HRZ 16764' 8872'
Kalubik 16903' 8919'
Kuparuk 17036' 8965'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed TerrieUubble ~'~~ ~ Title Technical Assistantlll Date I~ '/~.~.~'??
WB-05A 97-225 Prepared By Name/Number; Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24.' If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21.' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28.' If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Facility
Date/Time
20 Oct 97
21 Oct 97
Progress Report
West Beach
Well WB-05A Page 1
Rig POOL6 Date 11 August 99
06:00-14:00
06:00-13:00
13:00
13:00-14:00
14:00
14:00-14:01
14:00-14:01
14:01
14:01-22:00
14:01-19:00
19:00
19:00-20:30
20:30
20:30-22:00
22:00
22:00-02:30
22:00-02:00
02:00
02:00-02:30
02:30
02:30-03:30
02:30-03:30
03:30
03:30-04:00
03:30-04:00
04:00
04:00-04:30
04:00-04:30
04:30
04:30-06:00
04:30-05:00
05:00
05:00-05:30
05:30
05:30-06:00
06:00-06:00
06:00-07:00
Duration
8 hr
7 hr
1 hr
0 hr
0 hr
7-3/4 hr
4-3/4 hr
1-1/2 hr
1-1/2 hr
4-1/2 hr
4 hr
1/2 hr
1 hr
1 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
1-1/2 hr
1/2 hr
1/2hr
1/2 hr
24 hr
1 hr
Activity
Move rig
Rigged up Fluid system
Equipment work completed
Tested Mud pumps
Line up mud pumps and pressure test lines to 3000
psi.
Pressure test completed successfully - 3000.000 psi
Commission rig
Commissioned Drillfloor / Derrick
Accept rig at 1400, 10/20/97.
Work completed - Rig equipment in position
Fluid system
Fill pits with Water based mud
Truck in spud mud base from Baroid plant. Gel up
to 300 vis.
Began precautionary measures
Held safety meeting
Hold pre-spud meeting with all personnel.
Completed operations
Fill pits with Water based mud
Repair leaks in mud system. Continue to circulate
and prepare mud for spud.
Completed operations
BHA run no. 1
Made up BHA no. 1
MU BHA #1. Orient motor and MWD. Tag cement at
101'.
BHA no. 1 made up
Drilled cement to 110.0 ft
Fill well with water. Check for leaks, none.
Begin drilling cement.
SCR failed - Change operation
Repair
Repaired SCR
Equipment work completed
BHA run no. 1
Drilled cement to 120.0 ft
Continue drilling cement with water.
SCR failed - Change operation
Repair
Repaired SCR
Equipment work completed
BHA run no. 1
Drilled to 137.0 ft
Begin pumping mud and drill 120'-137'.
Stopped: Flowline plugged
Cleared Flowline
Jet out possum belly.
Equipment work completed
Drilled to 150.0 ft
Drill ahead 137'- 150'.
BHA run no. 1 (cont...)
Drilled to 247.0 ft (cont...)
Drill ahead 137'-150'.
Facility
Date/Time
22 Oct 97
West Beach
07:00
07:00-08:00
08:00
08:00-18:30
18:30
18:30-19:30
19:30
19:30-06:00
19:30-06:00
06:00-06:00
06:00-12:00
12:00
12:00
12:00-15:15
15:15
15:15-15:30
15:30
15:30-16:30
16:30
16:30-18:15
18:15
18:15-18:30
18:30
18:30-18:45
18:45
18:45-21:30
21:30
21:30-22:00
22:00
22:00-23:15
Progress Report
Well WB-05A Page 2
Rig POOL 6 Date 11 August 99
Duration
1 hr
10-1/2 hr
1 hr
10-1/2 hr
10-1/2 hr
24 hr
6 hr
3-1/4 hr
1/4 hr
1 hr
1-3/4 hr
1/4 hr
1/4 hr
2-3/4 hr
1/2 hr
1-1/4hr
Activity
Stopped: Flowline plugged
Cleared Shaker discharge line
Dewater suction pumps plugged. Line up cuttings
bypass. Rig up cuttings box and trucks.
Equipment work completed
Drilled to 666.0 ft
Drill 247'-666'. Lost flowline jet charging pump
and plugged flowline.
Stopped: Flowline plugged
Cleared Flowline
Equipment work completed
Drilled to 1275.0 ft
Drill and survey 1275'-1803'.
Drilled to 1275.0 ft
Drill 666' 1275'. Slide 1024'-1044' and
1055'-1075'.
BHA run no. 1 (cont...)
Drilled to 1803.0 ft (cont...)
Drill 666' 1275'. Slide 1024'-1044' and
1055'- 1075'.
Stopped: To circulate
Started scheduled wiper trip: due to Footage drilled
Circulated at 1803.0 ft
Circulate and condition wellbore. Recovered lots
of sand. Shakers occasionally blinding.
Obtained clean returns - 200.00 % hole volume
Flow check
Observe well, no flow. Blow down kelly.
Observed well static
Pulled out of hole to 1617.0 ft
POOH w/2 stands, OK. #3 pulled to 150 k (60 k
over).
Observed 60.00 klb overpull
Reamed to 1617.0 ft
Kelly up and work tight hole. Circulate and
recover sand, gravel, and shale. No problems with tight
spot when circulating or after without pump.
No further resistance
R.I.H. to 1803.0 ft
RIH w/2 stands, no problems.
On bottom
Held drill (Kick while tripping)
Held diverter drill. AMAS 120 sec. Held safety
meeting and discussed drill and duties.
Completed operations
Circulated at 1803.0 ft
Circulate and condition wellbore, pipe moving OK.
Obtained clean returns - 300.00 % hole volume
Pulled out of hole to 1592.0 ft
Stand back kelly and POOH w/2 stands. Pulled
tight again, up to 160 k over.
Observed 160.00 klb overpull
Reamed to 1592.0 ft
Kelly up and work tight hole. Pump condet/SAPP
sweep.
Facility
Date/Time
23 Oct 97
West Beach
23:15
23:15-23:30
23:30
23:30-02:30
02:30
02:30-03:45
03:45
03:45-04:00
04:00
04:00-05:00
05:00
05:00-06:00
05:00-06:00
06:00-06:15
06:00-06:15
06:15
06:15-05:00
06:15-08:00
08:00
08:00-11:45
11:45
11:45-12:00
12:00
12:00-12:30
12:30
12:30-22:30
22:30
22:30-23:30
Progress Report
Well WB-05A Page 3
Rig POOL6 Date 11 August 99
Duration
Activity
1/4 hr
3 hr
1-1/4 hr
1/4 hr
1 hr
1 hr
1 hr
1/4 hr
1/4 hr
22-3/4 hr
1-3/4 hr
3-3/4 hr
1/4 hr
1/2 hr
lOhr
1 hr
Began precautionary measures
Pumped out of hole to 1585.0 ft
LD single.
Began precautionary measures
Circulated at 1585.0 ft
Circulate and work tight hole. Assure vis 300+.
Obtained req. fluid properties - 300.00 %, hole vol.
Pulled out of hole to 1275.0 ft
POOH. Hole tight. Work hole without pump.
Stopped: To hold drill
Held drill (Kick while tripping)
Hold diverter drill. AMAS 80 sec. Discussed drill
and duties.
Completed operations
Pulled out of hole to 228.0 ft
Continue out of hole. No further overpull.
At BHA
Pulled BHA
Finish out of hole w/BHA. Minor clay on remaining
stabilizers and bit.
Pulled BHA
Continue out of hole with BHA to check for balling.
Top stabilizer had some clay, but not bad.
BHA run no. 1 (cont...)
Pulled BHA (cont...)
Continue out of hole with BHA to check for balling.
Top stabilizer had some clay, but not bad.
BHA Stood back
BHA run no. 2
Made up BHA no. 2
Change out MWD tool for JORPS. Orient motor and
MWD.
BHA no. 2 made up
R.I.H. to 1763.0 ft
TIH. No problems going to bottom.
Stopped: To take survey
Took MWD survey at 1766.0 ft
Kelly up, assure MWD function and take check shot.
OK.
Acceptable survey obtained at 1766.0 ft
Reamed to 1803.0 ft
Precautionary wash and ream to bottom. 15' of
fill.
On bottom
'Drilled to 2709.0 ft
Orient tools and begin kick-off. Drill and survey
1803'-2709'. Took survey after connection and
blew pop-off.
Pressure changed from 2000.0 psi to 4000.0 psi in 0.01 hr - String blt
Investigated pressure change
Investigate pressure up. Some cement evident at
pick-up area from DP. Attempt to surge string to
unplug. No success.
ked
Facility
Date/Time
24 Oct 97
25 Oct 97
West Beach
23:30
23:30-03:30
03:30
03:30-05:00
05:00
05:00-06:00
05:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00-10:15
06:00-07:00
07:00
07:00-10:00
10:00
10:00-10:15
10:15
10:15-11:00
10:15-11:00
11:00
11:00-06:00
11:00-13:00
13:00
13:00-13:30
13:30
13:30-00:00
00:00
00:00-00:30
00:30
00:30-05:00
05:00
05:00-05:30
Progress Report
Well WB-05A Page 4
Rig POOL6 Date 11 August 99
Duration
4 hr
1-1/2 hr
1 hr
1/2 hr
1/2 hr
1/2 hr
4-1/4 hr
1 hr
3 hr
1/4 hr
3/4 hr
3/4 hr
19hr
2 hr
1/2 hr
10-1/2 hr
1/2 hr
4-1/2 hr
1/2 hr
Activity
Completed operations
Pulled out of hole to 230.0 ft
POOH, wet for plugged string.
At BHA
Pulled BHA
LD stabilizers. String plugged with cement on top
of MWD. LD MWD. NO cement below MWD.
BHA Laid out
BHA mn no. 3
Tested Mud motor - Via string
Pump test motor. NO problems.
Function test completed satisfactorily
Made up BHA no. 3
PU new MWD.
Made up BHA no. 3
MU new MWD tool. Orient motor and MWD.
BHA mn no. 3 (cont...)
Made up BHA no. 3 (cont...)
MU new MWD tool. Orient motor and MWD.
BHA no. 3 made up
R.I.H. to 1000.0 ft
RIH. Hammer HWDP stands to assure no cement
inside.
Began precautionary measures
Tested M.W.D. tool - Via string
Flow test MWD, OK.
Function test completed satisfactorily
Repair
Repaired SCR
Investigate SCR assignments and trip out problem.
Equipment work completed
BHA mn no. 3
R.I.H. to 2695.0 fl
RIH. Tag fill @ 2695'.
Began precautionary measures
Took MWD survey at 2668.0 ft
Kelly up and wash/ream to bottom. Take check shots
@ 2668' and 2703'. OK.
Acceptable survey obtained at 2668.0 ft
Drilled to 3245.0 fl
Drill and survey 2708'-3245'. Hole acting a little
tight 3245'-3277'.
Stopped · To circulate
Circulated at 3277.0 ft
Circulate hi vis sweep while rotating and working
pipe. Some increase in cuttings when sweep
surfaced.
Hole swept with slug - 100.00 % hole volume
Drilled to 3630.0 fl
Drill and survey 3277'-3630'.
Stopped · To hold safety meeting
Held safety meeting
Hold safety meeting regarding injury earlier on
tour. Discussed pacing onself, not being in a
llUt.y Wll~'ll U3111~ LUll[3 a, llU- k)tll¢l ~,qUll. Jllll~.,ll[, O. llkl
Facility
Date/Time
26 Oct 97
Progress Report
West Beach
Well WB-05A Page 5
Rig POOL 6 Date 11 August 99
05:30
05:30-06:00
05:30-06:00
06:00-14:30
06:00-13:20
13:20
13:20-13:30
13:30
13:30-14:30
14:30
Duration
1/2 hr
1/2 hr
8-1/2 hr
7-1/4 hr
0 hr
1 hr
Activity using teamwork when working with heavy tools.
Completed operations
Drilled to 3652.0 ft
Drill and survey 3630'-3652'.
Drilled to 3652.0 ft
Drill and survey 3630'-4160'.
BHA run no. 3 (cont...)
Drilled to 4160.0 ft (cont...)
Drill and survey 3630'-4160'.
Pressure changed from 2300.0 psi to 1900.0 psi in 0.12 hr - Surface
washout
Investigated pressure change
Check for pressure loss. Anadrill noted lower
turbine rpm and then called out there was mud on
pad. Pick up off bottom, work pipe, blow out mud
line with air, and initiate spill response.
Operation stopped due to Incident
Worked toolstring at 4160.0 ft
Work pipe while cleaning up mud leak from washed
hammer union in breezeway of pump room. Notified
ARCO @ 5700 @ 1330. Spill technician Joe Hanover
responded. Estimated leak volume < 1 bbl. All fluid
contained within pump room or on mats and herculite
Operation stopped due to Incident
Inspection by Spill Tech and Company Rep indicated
none beyond containment.
14:30-01:00
14:30-00:00
10-1/2 hr
9-1/2 hr
WELLBORE STABLE WITH NO LOSS OR GAIN WHILE
WORKING PIPE.
Repair
Repaired High pressure lines
Effect repairs on mud line. Cut our washed hammer
union and weld in replacement. Allow welds to
cool.
00:00
00:00-01:00
01:00
01:00-06:00
01:00-02:30
02:30
02:30-02:45
1 hr
5 hr
1-1/2 hr
1/4 hr
MONITOR WELL VIA TRIP TANK WHILE MAKING REPAI]
WELLBORE STABLE, NO LOSS OR GAIN.
Work completed, High pressure lines changed out
Tested High pressure lines
Pressure test repaired mud line to 3500 psi.
Inspect for leaks none.
Pressure test completed successfully - 3500.000 psi
BHA run no. 4
Made up BHA no. 4
RIH w/BHA.
BHA no. 4 made up
Tested MWD/LWD - Via string
ADJUST CLOCK BACK 1 HOUR TO STANDARD TIME.
02:45
02:45-05:00
05:00
05:00-06:00
2-1/4 hr
1 hr
Flow test MWD/LWD, OK.
Function test completed satisfactorily
R.I.H. to 3015.0 ft
RIH. Encountered bridge. Work pipe at 21 XX.
Observed loss of 90.00 klb string weight
Reamed to 3015.0 ft
.S.
Progress Report
Facility West Beach
Well WB-05A Page 6
Rig POOL6 Date 11 August 99
Date/Time
05:00-06:00
06:00-22:40
06:00-10:30
10:30
10:30-11:30
11:30
11:30-12:00
12:00
12:00-22:40
22:40
22:40-06:00
22:40-05:15
27 Oct 97 05:15
05:15-06:00
05:15-06:00
06:00~06:05
06:00-06:05
06:05
06:05-07:00
06:05-07:00
07:00
07:00-08:30
07:00-08:30
08:30
08:30-22:00
08:30-22:00
22:00
22:00-23:00
22:00-23:00
Duration
1 hr
16-1/2 hr
4-1/2 hr
1 hr
1/2 hr
10-1/2 hr
7-1/4 hr
6-1/2 hr
3/4 hr
3/4 hr
0 hr
0 hr
3/4 hr
3/4 hr
1-1/2 hr
1-1/2 hr
13-1/2 hr
13-1/2 hr
1 hr
1 hr
Activity ream bridge.
Reamed to 3015.0 ft
Continue reaming. LD singles and ream stands 21,
22, and 25. Ran stands 23 and 24 without problem.
BHA run no. 4 (cont...)
Reamed to 3015.0 ft (cont...)
Continue reaming. LD singles and ream stands 21,
22, and 25. Ran stands 23 and 24 without problem.
Completed precautionary measures
R.I.H. to 4122.0 ft
RIH, no further problems.
Began precautionary measures
Reamed to 4160.0 ft
Precautionary ream to bottom. No fill.
On bottom
Drilled to 4958.0 ft
Drill and survey 4160'-4958'.
ART=2.0, AST--3.3
High pressure lines failed - Circulate
Driller noticed 200 psi loss and derickman notified
him of mud leak at union on HP discharge line of
mud pump #1. See incident report in comment
section. All fluid contained within pump room.
Repair
Repaired High pressure lines
Rig crew cleaned up pump room. Driller continued
to circulate with #2 pump and work pipe. No
problems. Make repairs to mud line.
Work completed, High pressure lines changed out
Tested High pressure lines
Pressure test repaired mud line to 3500 psi, OK.
Tested High pressure lines
Allow welds to cool and prepare to pressure test
repair.
Repair (cont...)
Tested High pressure lines (cont...)
Allow welds to cool and prepare to pressure test
repair.
Pressure test completed successfully - 3500.000 psi
BHA run no. 4
Drilled to 5046.0 ft
ART=.4
Liner failed - Circulate
Repair
Repaired Liner
Change swab and liner #2 pump.
Work completed, Liner changed out
BHA run no. 4
Drilled to 5837.0 ft
ART=6.2, AST= 1.7
Washpipe failed - Circulate
Repair
Repaired Washpipe -
Repair washpipe. Install headpin and circulate
.... " ..... '-:-- pip
VVI,.,I! WUIMII~ ~ WlIII~., IIIClMII~
Facility West Beach
Date/Time
23:00
23:00-23:30
23:00-23:30
23:30
23:30-03:30
23:30-03:30
28 Oct 97 03:30
03:30-06:00
03:30-06:00
06:00-06:05
06:00-06:05
06:05
06:05-13:30
06:05-13:15
13:15
13'15-13:30
13:30
13:30~06:00
13:30-00:00
29 Oct 97 00:00
00:00-05:00
Progress Report
Well WB-05A
Rig POOL 6
Page 7
Date 11 August 99
Duration
Activity
1/2 hr
1/2 hr
4 hr
4 hr
2-1/2 hr
2-1/2 hr
0 hr
0 hr
Work completed, Washpipe changed out
BHA run no. 4
Drilled to 5852.0 ft
ART=.5
Washpipe failed - Circulate
Repair
Repaired Washpipe
Repair washpipe. Install headpin and circulate
while making repair. Appears O-ring was not
completely seated when assembly was made up.
Work completed, Washpipe changed out
BHA run no. 4
Drilled to 6020.0 ft
Drill ahead. ART=I.8
BHA run no. 4 (cont...)
Drilled to 6027.0 ft (cont...)
Drill ahead. ART=i.8
High pressure lines failed - Work string
Had leak develop on standpipe union at rig floor.
Shut down to effect repairs. Work pipe. Monitor
hole, no gain or loss.
7-1/4 hr
7 hr
Spill response drill. Respond to standpipe leak.
AMAS 2 min 20 sec.
Clean mud from floor.
Repair
Repaired High pressure lines
Make repair preparations. Sniff area w/gas
detector. PJSM. Establish fire watch on floor and
cellar. Finished repair about 0900. Pressure test line
to 3500 psi, OK. Establish circulation and take a
survey.
Work completed, High pressure lines changed out
Hand noted small leak at union outside pump room
(Original line leak). Continue making repairs.
Weld bead in union and grind down. Welder
installed additional braces on line in
breezeway.
1/4 hr
16-1/2 hr
10-1/2 hr
Continue working pipe. No problems. No gain or
loss.
Tested High pressure lines
Pressure test lines to 3500 psi, OK.
Pressure test completed successfully - 3500.000 psi
BHA run no. 4
Drilled to 6640.0 ft
Drill and survey 6027'-6640'.
ART=5.0 hr, AST=I.0 hr.
5 hr
Held fire drill @ 2000. Full response 7.5 min.
Discuss drill.
Reached planned end of run - Section / well T.D.
Circulated at 6640.0 ft
~11~
Facility
Date/Time
Progress Report
West Beach
Well WB-05A
Rig POOL 6
Page 8
Date 11 August 99
05:00
05:00-06:00
05:00-06:00
Duration
1 hr
1 hr
Activity Pump high vis sweep.
Hole swept with slug - 200.00 % hole volume
Pulled out of hole to 5000.0 ft
Continue out of hole. Pulled tight @ 3900 bit
depth.
Pulled out of hole to 5000.0 ft
Begin short trip. Intend to pull above 3000'
minimum where we took weight on last trip in.
06:00-20:00
06:00-09:00
14hr
3 hr
First 10 stands pulled OK. Fill OK.
BHA run no. 4 (cont...)
Pulled out of hole to 3900.0 fl (cont...)
Begin short trip. Intend to pull above 3000'
minimum where we took weight on last trip in.
09:00
09:00-11:30
11:30
11:30-16:00
16:00
16:00-17:00
17:00
17:00-18:00
18:00
18:00-18:30
18:30
18:30-20:00
20:00
20:00-06:00
20:00-21:00
21:00
21:00-23:00
23:00
23:00-23:10
23:10
23:10-00:00
2-1/2 hr
4-1/2 hr
1 hr
1 hr
1/2 hr
1-1/2 hr
lOhr
1 hr
2 hr
0 hr
3/4 hr
First 10 stands pulled OK. Fill OK.
Observed 100.00 klb overpull
Reamed to 4003.0 ft
Kelly up and ream 3900'-4003'.
Completed precautionary measures
Pulled out of hole to 3900.0 ft
Stand back kelly and pull worked stand, OK.
Continue out of hole. Max overpull 35 K. Work pipe as
needed, no pump.
At BHA
Found extreme clay buildup on HWDP.
Pulled BHA
Pull and clean BHA. Clay buildup much less than
HWDP.
BHA Stood back
Serviced Drillfloor / Derrick
Clean floor.
Equipment work completed
Held safety meeting
PJSM--Cutting drill line. Review procedure and job
hazard analysis.
Completed operations
Serviced Block line
Cut 153' of drill line and slip 119'. Adjust
brakes.
Line slipped and cut
BHA run no. 5
Made up BHA no. 5
Rerun bit #4.
BHA no. 5 made up
R.I.H. to 3870.0 ft
RIH. No problems. Fill pipe prior to possible
problem interval.
Stopped: To hold drill
Held drill (Kick while tripping)
Hold D~ 1 drill. Well secure 1 min, AMAS 4.5 min.
Completed operations
R.I.H. to 4280.0 ft
Continue in hole. Hit bridge @ 4280'. Unable to
work through. PU kelly.
Facility
Date/Time
30 Oct 97
31 Oct 97
Progress Report
West Beach
Well WB-05A Page 9
Rig POOL6 Date 11 August 99
00:00
00:00-03:00
03:00
03:00-06:00
03:00-06:00
06:00-20:00
06:00-07:00
07:00
07:00-10:30
10:30
10:30-15:30
15:30
15:30-20:00
20:00
20:00-06:00
20:00-20:30
20:30
20:30-00:00
00:00
00:00-00:15
00:15
00:15-06:00
00:15-06:00
Duration
3 hr
3 hr
3 hr
14hr
1 hr
3-1/2 hr
5 hr
4-1/2 hr
10hr
1/2 hr
3-1/2 hr
1/4 hr
5-3/4 hr
5-3/4 hr
Activity
Began precautionary measures
Reamed to 4406.0 ft
LD 2 singles and ream bridge. Use caution to avoid
sidetracking. Cleaned up interval.
Completed precautionary measures
R.I.H. to 4924.0 ft
Continue in hole. Last 18 stands went well.
R.I.H. to 4924.0 ft
Run 3 stands without problems. Have been working
down remaining. No pump yet. Presently 18 stands
off bottom.
BHA run no. 5 (cont...)
R.I.H. to 6640.0 ft (cont...)
Run 3 stands without problems. Have been working
down remaining. No pump yet. Presently 18 stands
off bottom.
On bottom
Circulated at 6640.0 ft
Circulate and condition well for casing. Rotate
and move pipe. No problems moving pipe or
circulating.
Obtained clean returns ~ 125.00 % hole volume
Pulled out of hole to 206.0 ft
Pump pill and observe well. Well static. POOH.
Max overpull 30 K @ 4659'. 8 K overpull @ 3331'.
SLM. This strap 3' long, no correction made.
Hole fill indicates loosing some mud to formation.
Loss rate 3 - 4 bph.
At BHA
Pulled BHA
Pull and LD BHA. Clean floor.
BHA Laid out
Run Casing, 9-5/8in O.D.
Held safety meeting
PJSM-Held safety meeting with casing crew and rig
crew. Discuss rig up, beaver slide, pinch points,
pipe skate, and pipe handling. Stressed that a safe
operation was preferred to a speedy one. Discussed
how any one could stop the operation if unsure.
Completed operations
Rigged up Casing handling equipment
Work completed - Casing handling equipment in position
Held safety meeting
Change tours and hold safety meeting. Discuss
casing job and issues from previous meeting.
Completed operations
Ran Casing to 2630.0 ft (9-5/8in OD)
Run casing, 65 joints in. Operation going well.
Still experiencing losses of 3 to 4 BPH. Running
pipe in slowly.
Ran Casing to 2630.0 ft (9-5/8in OD)
Ran 162jts 9-5/8", 40~, L-80, Butt casing.
Shoe @ 6630', float collar @ 6586',
landing collar @ 6544', ES stage tool @ 2010'
[,~,,b ...... running casing. ' ...... :~ .... :,A
Facility West Beach
Date/Time
06:00-17'15
06:00-16:00
16:00
16:00-17:00
17:00
17:00-17:15
17:15
17:15-06:00
17:15-18:00
18:00
18:00-20:30
20:30
20:30-21:00
21:00
21:00-21:45
21:45
21:45-22:00
22:00
22:00-22:15
22:15
22:15-23:00
23:00
23:00-23:40
23:40
23:40-00:40
01 Nov 97 00:40
00:40-00:55
00:55
00:55-03:00
Progress Report
Well WB-05A Page 10
Rig POOL6 Date 11 August 99
Duration
11-1/4 hr
10hr
1 hr
1/4 hr
12-3/4 hr
3/4 hr
2-1/2 hr
1/2 hr
3/4 hr
1/4 hr
1/4 hr
3/4 hr
1/2 hr
1 hr
1/4 hr
2 hr
Activity running casing.
Run Casing, 9-5/8in O.D. (cont...)
Ran Casing to 6630.0 ft (9-5/8in OD) (cont...)
Ran 162jts 9-5/8", 40g, L-80, Butt casing.
Shoe @ 6630', float collar @ 6586',
landing collar @ 6544', ES stage tool @ 2010'
No problems running casing. Lost some fluid while
running casing.
Stopped · At sub-assembly
Installed Casing hanger
PU hanger and landing joint.
Equipment work completed
Ran Casing to 6630.0 ft (9-5/8in OD)
Hanger landed
Cement · Casing cement
Rigged up High pressure lines
RU cementing head and lines.
Work completed - High pressure lines in position
Circulated at 6630.0 ft
Break circulation and prepare well for cement.
Stage up circulating rate to 110 spm -9.5 bpm.
Obtained clean returns - 200.00 % hole volume
Held safety meeting
Hold PJSM with rig personnel, Halliburton
cementers, and Peak truck drivers. Discussed operation,
paramount need to communicate, avoid HP lines, observe
lines and truck for leaks.
Completed operations
Cleared Chicksan lines
Prime up Halliburton, pressurize tanks, and launch
bottom plug with 10 bbl water.
Stopped ' To pressure test
Tested High pressure lines
Pressure test cementing lines to 3500 psi.
Pressure test completed successfully - 3500.000 psi
Pumped Water spacers - volume 75.000 bbl
Pump remaining water spacer. 75 bbl total.
Required volume of spacer pumped
Mixed and pumped slurry - 220.000 bbl
Mix and pump 570 sx (220 bbl) Permafrost E lead @
12.0 ppg
Lead cement pumped
Mixed and pumped slurry - 176.000 bbl
Mix and pump 860 sx (176 bbl) Class G tail @ 15.8
PPg.
Released Top plug
Displaced slurry - 496.000 bbl
Displace slurry with 10 bbl water, 330 bbls mud,
and 156 bbls water.
Plug bumped
Functioned DV collar
Load ES closing plug and pressure up opening ES @
2000 psi.
Equipment work completed
Circulated at 2010.0 ft
Facility West Beach
Date/Time
03:00
03:00-06:00
03:00-06:00
06:00-14:00
06:00-06:15
06:15
06:15-06:30
06:30
06:30-09:30
09:30
09:30-10:00
10:00
10:00-12:00
12:00
12:00-14:00
14:00
14:00-20:00
14:00-20:00
20:00
20:00-23:00
20:00-23:00
23:00
23:00-06:00
23:00-00:00
02 Nov 97 00:00
00:00-00:15
Progress Report
Well WB-05A Page 11
Rig POOL6 Date 11 August 99
Duration
3 hr
3 hr
8 hr
1/4 hr
1/4 hr
3 hr
1/2 hr
2 hr
2 hr
6 hr
6 hr
3 hr
3 hr
7 hr
1 hr
1/4 hr
Activity approximately 420 bbls contaminated mud and cement.
Obtained bottoms up (100% annulus volume)
Circulated at 2010.0 ft
Finish circulating well. All trucks in position.
8 super suckers available.
Circulated at 2010.0 ft
Continue to circulate well. Wellbore cleaned up
nicely. Await return of super suckers and vac trucks
to perform 2nd stage.
Cement: Casing cement (cont...)
Circulated at 2010.0 ft (cont...)
Continue to circulate well. Wellbore cleaned up
nicely. Await return of super suckers and vac trucks
to perform 2nd stage.
Obtained clean returns - 200.00 % hole volume
Cleared Chicksan lines
Prime up and pump 10 bbls water. Pressure test
lines to 2500 psi.
Equipment work completed
Mixed and pumped slurry - 930.000 bbl
Mix and pump 2400 sx (930 bbls) Permafrost E @ 12.0
ppg. Observed red dyed slurry @ 875 bbl pumped,
increase in pH, weight increase to 11.2 ppg @ 930
bbl pumped.
Released Top plug
Displaced slurry - 153.000 bbl
Displace slurry with 10 bbl water and 142 bbl mud.
Plug bumped
Bumped plug to 1500 psi, released pressure. Floats
held. Pressure to 2000 psi and closed cementer.
Much less contaminated returns than on 1 st stage.
Cleared Bell nipple
Drain and flush stack. Blow down mud lines and
remove fill up line.
Equipment work completed
Rigged down Casing handling equipment
Backout and LD landing joint and casing elevators.
Work completed, equipment laid out
Nipple down Divertor
Rigged down Divertor
ND all diverter equipment.
Work completed, equipment laid out
Wellhead work
Installed Casing head
Install FMC Gen 5 casing head and tubing head.
Test metal to metal seal to 1000 psi.
Equipment work completed
Nipple up BOP stack
Installed Adapter spool
NU 11" 5M x 13-5/8" 5M DSA.
Equipment work completed
Held safety meeting
PJSM--NU BOP. Reviewed pinch points and
communication signals.
Facility West Beach
Date/Time
00:15
00:15-06:00
00:15-06:00
Duration
5-3/4 hr
5-3/4 hr
06:00-06:00
06:00-00:00
24 hr
18hr
03 Nov 97 00:00
00:00-05:59
5-3/4 hr
05:59
06:00-10:30
06:00-10:30
4-1/2 hr
4-1/2 hr
10:30
10:30-06:00
10:30-22:00
19-1/2 hr
11-1/2 hr
22:00
22:00-04:00
6 hr
04 Nov 97 04:00
04:00-06:00
2 hr
Progress Report
Well WB-05A Page 12
Rig POOL6 Date 11 August 99
Activity
Completed operations
Installed BOP stack
Begin stacking up BOP components.
Installed BOP stack
Move in BOP components and begin stacking up
13-5/8", 5000, RSRRA clamp hub BOP stack, choke manifold,
and control lines.
Nipple up BOP stack (cont...)
Installed BOP stack (cont...)
Move in BOP components and begin stacking up
13~5/8", 5000, RSRRA clamp hub BOP stack, choke manifold,
and control lines.
Equipment work completed
Tested All functions
Begin testing BOP equipment. Testing witnessed by
Chuck Shevey AOGCC.
Test all rams, choke valves, floor valves, and
kelly 250 psi low and 5000 psi high. Had some
leaks on hubs that were repaired. Lower kelly
valve failed, rebuild same and tested OK.
Suspended pressure test on Annular preventor, observed leak
Unable to get annular preventer to hold.
Nipple up BOP stack (cont...)
Serviced Annular preventor
Work on annular preventer. Steam and cycle same.
Increase closing pressure and attempt to get test.
Cannot get unit to hold more than 2000 psi.
Pressure up kelly, standpipe, and mud lines back
to pump. Block and bleeder valves at pump #2
leaked.
Annular preventor failed - Abort operation
Repair
Repaired Annular preventor
Begin work to replace hydril element. Great
difficulty breaking top of annular. Finally broke
top using hydraulic jack.
Rebuild 5" block valve and bleeder valve on pump
#2.
Equipment work completed
Repaired Annular preventor
Complete removal and replacement of annular
element. When originally installed, replaced element had
been cut as if replaced with pipe in the hole. Cut
not very clean.
Equipment work completed ..
Tested Annular preventor
Begin test process. Install test joint, close
upper pipe rams and shell test BOP, choke and kill
lines. Repair minor leaks on kill line and test
to 5000 psi
.
Begin annular test. Test to 250 psi, OK. Attempt
high pressure tcst, Icak on hub connection.
Facility
Date/Time
West Beach
Progress Report
06:00-07:00
06:00-07:00
Well WB-05A Page 13
Rig POOL 6 Date 11 August 99
Duration
Activity
07:00
1 hr
1 hr
Repair (cont...)
Tested Annular preventor (cont...)
Begin test process. Install test joint, close
upper pipe rams and shell test BOP, choke and kill
lines. Repair minor leaks on kill line and test
to 5000 psi
07:00-10:30
07:00-08:00
08:00
08:00-09:00
09:00
09:00-10:30
10:30
10:30-16:30
10:30-15:30
15:30
15:30-16:30
16:30
16:30-17:30
16:30-17:30
17:30
17:30-23:00
17:30-18:00
18:00
18:00-19:30
19:30
19:30-23:00
23:00
23:00-00:00
23:00-00:00
05 Nov 97 00:00
00:00-02:00
3-1/2 hr
1 hr
1 hr
1-1/2 hr
6 hr
5 hr
1 hr
1 hr
1 hr
5-1/2 hr
1/2 hr
1-1/2 hr
3-1/2 hr
1 hr
1 hr
Begin annular test. Test to 250 psi, OK. Attempt
high pressure test, leak on hub connection.
Pressure test completed successfully - 3500.000 psi
Successfully completed testing annular. 250 psi
low, 3500 psi high.
Nipple up All functions
Rigged down BOP test plug assembly
Pull test plug and install long bowl protector.
Work completed, equipment laid out
Tested High pressure lines
Pressure test mud lines to 4200 psi. Saw slow
decline of 400 psi in 30 min. No leaks evident.
Pressure test completed successfully - 4200.000 psi
Rigged up Bell nipple
Work completed - Bell nipple in position
BHA run no. 5
Made up BHA no. 5
Move BHA components to floor. MU BHA. RIH.
BHA no. 5 made up
Laid down 150.0 ft of 5in OD drill pipe
Lay down 5 joints HWDP.
Handling equipment failed - Change operation
Repair
Repaired Handling equipment
Repair lay down machine and SCR.
Work completed, Handling equipment changed out
BHA run no. 5
Laid down 310.0 ft of 5in OD drill pipe
Lay down an additional 10 joints HWDP.
10 joints laid out
R.I.H. to 2010.0 ft
RIH and tag ES cementer at 2010'.
Stopped: At sub-assembly
Drilled installed equipment - DV collar
Drill out ES cementer. Having intermittent
problems with SCR assignments.
SCR failed - Change operation
Repair
Repaired SCR
Work on SCR. Electrician from rig 7 assisting.
2 hr
While working on SCR conducted D-1 drills with
both crews. Discussed equipment positioning, crew
assignments, communication.
Work completed, SCR changed out
BHA run no. 5
Facility
Date/Time
West Beach
Progress Report
00:00-02:00
Well WB-05A Page 14
Rig POOL6 Date 11 August 99
02:00
02:00-03:00
02:00-03:00
03:00
03:00-06:00
03:00-04:30
04:30
04:30-05:45
05:45
05:45-06:00
06:00-13:30
06:00-07:00
07:00
07:00-10:00
10:00
10:00-11:00
11:00
11:00-11:30
11:30
11:30-12:00
12:00
12:00-13:30
13:30
13:30-16:30
13:30-16:30
16:30
16:30-06:00
16:30-22:30
22:30
22:30-23:00
Duration
2 hr
1 hr
1 hr
3 hr
1-1/2 hr
1-1/4 hr
1/4 hr
7-1/2 hr
1 hr
3 hr
1 hr
1/2 hr
1/2 hr
1-1/2 hr
3 hr
3 hr
13-1/2 hr
6 hr
1/2 hr
Activity
R.I.H. to 5o00.0 ft
RIH. Continued to have SCR problems.
SCR failed - Change operation
Repair
Repaired SCR
Effect repairs on SCR.
Work completed, SCR changed out
BHA run no. 5
R.I.H. to 6527.0 ft
Continue in hole. PU 13 joints DP. Tag cement at
6527'. Landing collar is at 6544'.
Stopped: At sub-assembly
Circulated at 6527.0 ft
Circulate and condition mud for casing test.
Hole displaced with Water based mud - 150.00 % displaced
Tested Casing - Via annulus and string
Prepare to test surface casing.
BHA run no. 5 (cont...)
Tested Casing - Via annulus and string (cont...)
Prepare to test surface casing.
Pressure test completed successfully - 3000.000 psi
Drilled cement to 6020.0 ft
Drill out landing collar and float collar.
Stopped: To hold drill
Held drill (Kick (well kill))
Begin circulating well. Meet with crew and discuss
planned drill. Discussed duty assignments. Work
pipe and initiate drill. Crew response good.
Completed operations
Drilled cement to 6040.0 ft
Continue drill out.
At Top of new hole section: 6040.0 ft
Drilled to 6660.0 ft
Drill 8-1/2" hole 6640'-6660'.
ART= .2
Stopped: To perform FIT
Circulated at 6660.0 ft
Circulate well in preparation for LOT.
Hole displaced with Water based mud - 150.00 % displaced
Perform integrity test
Performed formation integrity test
Perform FIT @ 6660 MD, 4830' TVD.
MW= 9.2 ppg, applied pressure 800 psi
EMW=12.4 ppg
Consult with Drilling Superintendent. Proceed to
drill ahead.
Obtained leak off 12.4 ppg EMW
BHA run no. 5
Drilled to 7019.0 ft
Drill ahead 6660'-7019'.
ART=2.0
Stopped: To service drilling equipment
Serviced Swivel
Change shaker screens and grease swivel packing.
Facility West Beach
Date/Time
23:00
23:00-00:00
06 Nov 97 00:00
00:00-00:30
00:30
00:30-06:00
00:30-06:00
06:00-06:00
06:00-15:30
15:30
15:30-16:30
16:30
16:30-19:00
19:00
19:00-20:00
20:00
20:00-06:00
20:00-06:00
07 Nov 97 06:00-06:00
06:00-05:30
08 Nov 97 05:30
05:30-06:00
05:30-06:00
06:00-06:00
06:00-06:30
06:30
06:30-09:00
09:00
Progress Report
Well WB-05A Page 15
Rig POOL6 Date 11 August 99
Duration
1 hr
1/2 hr
5-1/2 hr
5-1/2 hr
24 hr
9-1/2 hr
1 hr
2-1/2 hr
1 hr
lOhr
lOhr
24 hr
23-1/2 hr
1/2 hr
1/2 hr
24 hr
1/2 hr
2-1/2 hr
Activity
Equipment work completed
Drilled to 7082.0 ft
Drill ahead 7019' - 7082'.
ART--.3
Stopped: To hold safety meeting
Held safety meeting
Crew change and PJSM on current operations.
Completed operations
Drilled to 7539.0 ft
Drill ahead 7082'-7539'.
ART--3.0, AST=.5
Drilled to 7539.0 ft
Directional drill 7539 to 8011' Art 3.5 hrs, Ast
1.0 hrs, Average Rop 104 ft/hr
BHA run no. 5 (cont...)
Drilled to 8011.0 ft (cont...)
Directional drill 7539 to 8011' Art 3.5 hrs, Asr
1.0 hrs, Average Rop 104 ft/hr
Began precautionary measures
Circulated at 8011.0 ft
Circulate Hole clean for short trip
Obtained clean returns - 150.00 % hole volume
Pulled out of hole to 6630.0 ft
Swabbing 7400 to 7000'
At 9-5/8in casing shoe
R.I.H. to 8011.0 ft
TIH, Precautionary ream 30' to bottom at 8011' - no
problem
On bottom
Drilled to 8509.0 ft
Directional drill 8509 to 10002' - Art 9.25 hrs,
Asr 8.75 hrs, Average Rop 82.94 ft/hr
Drilled to 8509.0 ft
Directional drill 8011 to 8509' at 0600 hrs, Art
3.5 hrs, Ast 3.0 hrs, Average Rop 76.6 ft/hr
BHA run no. 5 (cont...)
Drilled to 10002.0 ft (cont...)
Directional drill 8011 to 8509' at 0600 hrs, Art
3.5 hrs, Asr 3.0 hrs, Average Rop 76.6 ft/hr
Started scheduled wiper trip: due to Footage drilled
Circulated at 10002.0 ft
Finish circulating hole clean
Circulated at 10002.0 ft
Circulate hole clean before wiper trip to casing
shoe
BHA run no. 5 (cont...)
Circulated at 10002.0 ft (cont...)
Circulate hole clean before wiper trip to casing
shoe
Obtained clean returns - 125.00 % hole volume
Pulled out of hole to 6630.0 ft
Monitior well, Pump slug - pooh to casing shoe for
wiper trip - tight 8800 to 8700'
At 9-5/8in casing shoe
Facility
Date/Time
09 Nov 97
Progress Report
West Beach
Well WB-05A Page 16
Rig POOL 6 Date 11 August 99
09:00-09:30
09:30
09:30-10:30
10:30
10:30-12:00
12:00
12:00-14:00
14:00
14:00-18:30
18:30
18:30-19:00
19:00
19:00-04:00
04:00
04:00-05:00
05:00
05:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00-02:00
06:00-07:00
07:00
07:00-21:00
21:00
21:00-22:30
22:30
22:30-02:00
Duration
1/2 hr
1 hr
1-1/2 hr
2 hr
4-1/2 hr
1/2 hr
9 hr
1 hr
1/2 hr
1/2 hr
1/2 hr
20 hr
1 hr
14hr
1-1/2 hr
3-1/2 hr
Activity
Held drill (Kick while tripping)
D-1 bop Trip drill - Well secure men in place 90
sec. - Prejob safety meeting on cutting drill line
Completed operations
Serviced Block line
Cut 102' drill line
Line slipped and cut
Serviced Draw works
Install new break out line - service draw works
Equipment work completed
R.I.H. to 10002.0 ft
TIH - precautionary ream 40' to bottom - no problem
On bottom
Drilled to 10253.0 ft
Drill 10002 to 10253' - Art 2 hrs, Ast 1 hr,
Average Rop 83.6 ft/hr
Stopped: To service drilling equipment
Serviced Mud pumps
Change swab on pump #1
Equipment work completed
Drilled to 11005.0 ft
Drill 10253 to 11005' Art 5.75 hrs, Ast 1 hr,
Average Rop 111.4 ft/hr
Began precautionary measures
Circulated at 11005.0 ft
circulate hole clean
Obtained clean returns - 125.00 % hole volume
Pulled out of hole to 9880.0 ft
Pump slug - Pooh 12 stands to 9880' for wiper trip
At top of check trip interval
R.I.H. to 10400.0 ft
Trip in hole at 0600'- no problem on short trip
R.I.H. to 10400.0 ft
Finish TIH to 11005' Precautionary ream 40' to
bottom - 5' of fill
no. 5 (cont...)
to 11005.0 ft (cont...)
Finish TIH to 11005' Precautionary ream 40' to
bottom - 5' of fill
On bottom
Drilled to 11821.0 ft
Directional drill 11005 to 11821' Art 7.0 hrs, Ast
3.0 hrs, Average Rop 81.6 fffhr - Increase mud wt.
9.3 to 9.5 ppg while drilling
Began precautionary measures
Reached plan depth to change over mud to 3% Kcl
system
Circulated at 11821.0 ft
Circulate around high vis sweep
Obtained clean returns - 125.00 % hole volume
Pulled out of hole to 6630.0 ft
Monitor well - pump slug - Pooh to casing shoe -
Max drag 40k over first 10 stands, 15k max after 10
stands
BHA run
R.I.H.
Facility West Beach
Date/Time
10 Nov 97 02:00
02:00-06:00
02:00-06:00
02:00-06:00
06:00-07:30
06:00-07:30
07:30
07:30-06:00
07:30-10:00
10:00
10:00-13:00
13:00
13:00-06:00
13:00-06:00
11 Nov 97 06:00-06:00
06:00-11:00
11:00
11:00-12:30
12:30
12:30-13:30
13:30
13:30-14:00
14:00
14:00-15:00
15:00
15:00-06:00
Progress Report
Well WB-05A Page 17
Rig POOL 6 Date 11 August 99
Duration
4 hr
4 hr
4 hr
1-1/2 hr
1-1/2 hr
22-1/2 hr
2-1/2 hr
3 hr
17hr
17hr
24 hr
5 hr
1-1/2 hr
1 hr
1/2 hr
1 hr
15hr
Activity
At 9-5/8in casing shoe
Fluid system
Fill pits with Water based mud
Finish taking on 600 bbls of 3 % Kcl mud in pits
Fill pits with Water based mud
Clean mud pits - Mix spacer - Taking on 3% Kcl mud
at 0600 hrs
Fluid system (cont...)
Fill pits with Water based mud (cont...)
Clean mud pits - Mix spacer - Taking on 3% Kcl mud
at 0600 hrs
Completed operations
BHA run no. 5
R.I.H. to 11821.0 ft
TIH - precautionary ream 40' to bottom
On bottom
Circulated at 11821.0 ft
Circulate bottoms up to thin mud before displacing
to kcl - Pump 50 bbls of high vis N-vis mud
weighted to 9.5 ppg, followed by 3%kcl mud displaced at
13.7 bpm
Hole displaced with Water based mud - 100.00 % displaced
Drilled to 12640.0 ft
Directional drill 12640 to 13014' Art 3.5 hrs, Asr
0 hrs, Average Rop 106.9 ft/hr
Drilled to 12640.0 fl
Directional drill 11821 to 12640' Art 8.0 hrs, Ast
3.5 hrs, Average Rop 71.2 ft/hr - After
displacement wall cake comming over shaker - Torque increased
16000 to 19000 ft/# - Increased Lub-Tex content to
2%, Add approx 1% drill-N-slide,
BHA run no. 5 (cont...)
Drilled to 13014.0 ft (cont...)
Directional drill 11821 to 12640' Art 8.0 hrs, Ast
3.5 hrs, Average Rop 71.2 ft/hr - After
displacement wall cake comming over shaker - Torque increased
16000 to 19000 ft/# - Increased Lub-Tex content to
2%, Add approx 1% drill-N-slide,
Began precautionary measures
Circulated at 13014.0 ft
Circulate around high vis sweep
Obtained clean returns - 150.00 % hole volume
Pulled out of hole to 11500.0 ft
Monitor well - pump slug - pooh for wiper trip 16
stands, no drag in new hole, old hole dragging 10 to
15k over
At top of check trip interval
Serviced Draw works
Equipment work completed
R.I.H. to 13014.0 ft
TIh, no problem, wash 40' to bottom, no fill
On bottom
Drilled to 13800.0 ft
Directional drill 13014 to 13800' at 0600 hrs - Art
6.0 hfs, Asr,, -,~ ,_ ..............
o~..~ It/In -
~-. I ...)
Facility
Date/Time
12 Nov 97
13 Nov 97
14 Nov 97
Progress Report
West Beach
Well WB-05A Page 18
Rig POOL 6 Date 11 August 99
06:00-06:00
06:00-14:00
14:00
14:00-15:00
15:00
15:00-18:00
18:00
18:00-20:00
20:00
20:00-21:00
21:00
21:00-22:30
22:30
22:30-06:00
06:00-12:30
06:00-12:30
12:30
12:30-14:30
12:30-14:30
14:30
14:30-22:00
14:30-22:00
22:00
22:00-23:00
22:00-23:00
23:00
23:00-06:00
23:00-01:00
01:00
01:00-03:00
03:00
03:00-06:00
06:00-17:00
06:00-12:00
12:00
12:00-12:30
12:30
12:30-13:30
13:30
13:30-17:00
Duration
24 hr
8 hr
1 hr
3 hr
2 hr
1 hr
1-1/2 hr
7-1/2 hr
6-1/2 hr
6-1/2 hr
2 hr
2 hr
7-1/2 hr
7-1/2 hr
1 hr
1 hr
7 hr
2 hr
2 hr
3 hr
llhr
6 hr
1/2 hr
1 hr
3-1/2 hr
Activity Pumping high vis sweeps every 3-4 hrs to aid hole
BHA run no. 5 (cont...)
Drilled to 14282.0 ft (cont...)
Directional drill 13014 to 13800' at 0600 hrs - Art
6.0 hrs, Ast 2.75 hrs, Average Rop 89.9 ft/hr -
Pumping high vis sweeps every 3-4 hrs to aid hole
cleaning -torque 18000 Ft/# on bottom
Began precautionary measures
Serviced Drillfloor / Derrick
Equipment work completed
Drilled to 14449.0 ft
Stopped: To circulate
Circulated at 14449.0 ft
Obtained bottoms up (100% 'annulus volume)
Pulled out of hole to 13390.0 ft
SHORT TRIP
At top of check trip interval
R.I.H. to 14449.0 ft
WIPER TRIP WENT OK
On bottom
Drilled to 14873.0 ft
BHA run no. 5 (cont...)
Drilled to 15278.0 ft (cont...)
Swivel failed - Circulate
Repair
Repaired Swivel
CIRCULATE & ROTATE SLOWLY WHILE CHANGE SWIV ;L
PACKING
Equipment work completed
BHA run no. 5
Drilled to 15641.0 ft
Pistons failed - Work string
Repair
Repaired Pistons
CHANGE #2 PUMP SWAB
Equipment work completed
BHA run no. 5
Drilled to 15744.0 ft
Reached planned end of run - Directional objective met
Circulated at 15744.0 ft
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 13800.0 ft
POOH w/SLM. Several tight spots. Max overpull=50K.
Work back down-no pump. OK 2nd time thru.
BHA run no. 5 (cont...)
Pulled out of hole to 6600.0 ft (cont...)
POOH w/SLM. Several tight spots. Max overpull=50K.
Work back down-no pump. OK 2nd time thru.
At 9-5/8in casing shoe
Held safety meeting
Pre-Job Safety Meeting-cutting drill line.
Completed operations
Serviced Block line
Line slipped and cut
Pulled out of hole to 90.0 ft
Facility
Date/Time
15 Nov 97
Progress Report
West Beach
Well WB-05A Page 19
Rig POOL6 Date 11 August 99
17:00
17:00-20:00
17:00-20:00
20:00
20:00-21:30
20:00-21:30
21:30
21:30-03:30
21:30-22:30
22:30
22:30-23:00
23:00
23:00-02:30
02:30
02:30-03:00
03:00
03:00-03:30
03:30
03:30-06:00
03:30-04:00
04:00
04:00-06:00
06:00-13:30
06:00-07:00
07:00
07:00-09:30
09:30
09:30-13:30
13:30
13:30-21:00
13:30-14:30
14:30
14:30-16:30
16:30
16:30-18:30
18:30
18:30-20:30
20:30
20:30-21:00
21:00
21:00-06:00
21:00-22:30
Duration
3 hr
3 hr
1-1/2 hr
1-1/2 hr
6 hr
1 hr
1/2 hr
3-1/2 hr
1/2 hr
1/2 hr
2-1/2 hr
1/2 hr
2 hr
7-1/2 hr
1 hr
2-1/2 hr
4 hr
7-1/2 hr
1 hr
2 hr
2 hr
2 hr
1/2 hr
9 hr
1-1/2 hr
Activity
Draw works failed - Change operation
Repair
Repaired SCR
'B' Traction motor blower motor down-change out.
'A' traction motor SCR problem-Repaired
Equipment work completed
BHA run no. 5
Pulled BHA
BHA Laid out
Test well control equipment
Retrieved Wear bushing
Equipment work completed
Installed BOP test plug assembly
Equipment work completed
Tested BOP stack
Test BOPE. Annular to 500-3500. BOPE to 500-5000.
Test witnessed by Lou Grimaldi-AOGCC
Pressure test completed successfully - 5000.000 psi
Retrieved BOP test plug assembly
Equipment work completed
Retrieved Wear bushing
Equipment work completed
BHA run no. 6
Held safety meeting
Pre Job Safety meeting-Handling MWD tools
Completed operations
Made up BHA no. 6
PRE JOB SAFETY ON LOADING RADIOACTIVE SOURCE
BHA run no. 6 (cont...)
Made up BHA no. 6 (cont...)
PRE JOB SAFETY ON LOADING RADIOACTIVE SOURCE
BHA no. 6 made up
R.I.H. to 5356.0 ft
Began precautionary measures
Laid down 2235.0 ft of 5in OD drill pipe
L/D 72 JTS S-135 DP
72 joints laid out
Suspend operations
Functioned downhole tools at 2100.0 ft
SHALLOW TEST MWD-TEST FAILED
M.W.D. tool failed - Abort operation
Pulled out of hole to 90.0 ft
At BHA
Functioned downhole tools at 90.0 ft
RESET MWD SIGNAL TO SURF. EQUIP.
Equipment work completed
R.I.H. to 2100.0 ft
Began precautionary measures
Functioned downhole tools at 2100.0 ft
SHALLOW TEST MWD-TEST OK
Equipment work completed
BHA run no. 6
Singled in drill pipe to 5350.0 ft
P/U 72 JTS. 'G' DP
Facility West Beach
Date/Time
22:30
22:30-23:30
23:30
23:30-00:00
16 Nov 97 00:00
00:00-03:00
03:00
03:00-04:00
04:00
04:00-06:00
06:00
06:00-18:00
06:00-06:30
06:30
06:30-07:30
07:30
07:30-09:30
09:30
09:30-10:00
10:00
10:00-10:30
10:30
10:30-18:00
18:00
18:00-22:30
18:00-22:30
22:30
22:30-06:00
22:30-06:00
22:30-06:00
17 Nov 97 06:00-06:00
06:00-15:00
15:00
15:00-16:00
Progress Report
Well WB-05A Page 20
Rig POOL6 Date 11 August 99
Duration
1 hr
1/2 hr
3 hr
1 hr
2 hr
12hr
1/2 hr
1 hr
2 hr
1/2 hr
1/2 hr
7-1/2 hr
4-1/2 hr
4-1/2 hr
7-1/2 hr
7-1/2 hr
7-1/2 hr
24 hr
9 hr
1 hr
Activity
72 joints picked up
R.I.H. to 6566.0 ft
At 9-5/8in casing shoe
Circulated at 6566.0 ft
FILL DRILL PIPE
Broke circulation
R.I.H. to 9738.0 ft
RESISTANCE DOWN FROM 9494-9738. WORK PIPE THRU'
9738.
Observed 100.00 klb resistance
Washed to 9773.0 ft
PFU KELLY. BROKE CIRC. WASH FROM 9738-9773
No further resistance
R.I.H. to 13830.0 ft
NO FURTHER RESISTANCE
Stopped: To circulate
BREAK CIRC., FILL PIPE
BHA run no. 6 (cont...)
Circulated at 13830.0 ft
CIRC. HEAVY, THICK MUD
Broke circulation
R.I.H. to 15400.0 ft
Stopped: To circulate
Circulated at 15320.0 ft
CIRC. HEAVY, THICK MUD (10.3ppg)
Obtained bottoms up (100% annulus volume)
Washed to 15744.0 ft
WASH TO BOTTOM 15685-15744(15' FILL)
On bottom
Took MWD survey at 15707.0 ft
CK SHOT SURVEY @ 15707
Acceptable survey obtained at 15707.0 ft
Drilled to 15914.0 ft
DRILL & SURVEY W/MWD
Mud pumps failed - Circulate
Repair
Repaired Mud pumps
CHANGE DRIVE BELT ON #1 MUD PUMP
Equipment work completed
BHA run no. 6
Drilled to 16102.0 ft
DRILL & SURVEY W/MWD
Drilled to 16102.0 ft
Drill with MWD surveys. Actual Rot Hrs = 4 1/4, Act
Sliding Hrs = 2 1/2.
BHA run no. 6 (cont...)
Drilled to 16293.0 ft (cont...)
Drill with MWD surveys. Actual Rot Hrs = 4 1/4, Act
Sliding Hrs = 2 1/2.
Stopped: To circulate
Circulate hole clean for short trip to allow mud
pump guard repair.
Circulated at 16293.0 ft
Circulate hole clean
,O
Facility
Date/Time
West Beach
Duration
1/2 hr
16:00
16:00-16:30
16:30
16:30-17:00
17:00
17:00-17:30
17:30
17:30-01:00
18 Nov 97 01:00
01:00-02:30
02:30
02:30-06:00
1/2 hr
1/2 hr
7-1/2 hr
1-1/2 hr
3-1/2 hr
3-1/2 hr
02:30-06:00
24 hr
2-1/2 hr
06:00-06:00
06:00-08:30
08:30
08:30-09:30
1 hr
11-1/2 hr
09:30
09:30-21:00
21:00
21:00-00:00 3 hr
19 Nov 97 00:00
00:00-06:00 6 hr
00:00~06:00 6 hr
10-1/2 hr
4 hr
06:00~ 16:30
06:00~ 10:00
Progress Report
Well WB-05A Page 21
Rig POOL6 Date 11 August 99
Activity
Stopped · To flowcheck well
Pulled out of hole to 16293.0 ft
Check trip 6 stands to 15685. No tight hole
observed. Hole fill OK.
At top of check trip interval
R.I.H. to 16293.0 ft
No tight hole.
On bottom
Serviced Swivel
Grease swivel and lube rig.
Equipment work completed
Drilled to 16462.0 ft
Drill ahead with MWD. Act Rot Hrs 1
Mud pumps failed - Circulate
Pump lost suction due to trash in suction line.
Serviced Mud pumps
Worked on Mud Pump #1. Cleaned trash from suction.
Equipment work completed
Drilled to 16462.0 ft
Drill with MWD. Act Rot Hrs 1 1/2
Drilled to 16462.0 ft
Drill with MWD. Actual roatating hrs = 1.9, actual
sliding hrs = 0.9
BHA run no. 6 (cont...)
Drilled to 16595.0 ft (cont...)
Drill with MWD. Actual roatating hrs - 1.9, actual
sliding hrs = 0.9
Mud pumps failed - Work string
Swab MP # 2. Work string and circulate with one
pump.
Serviced Mud pumps
Changed piston, liner, and wear plate MP #2
Work completed, Mud pumps changed out
Drilled to 16754.0 ft
Drill with MWD from 16595 to 16754. Act rot hrs =
5.75, act sliding hrs = 3
ROP dropped from 25.0 fi/hr to 14.7 ft/hr - Bit quit
ROP as low as 6 fi/hr 16724 - 730. Did not increase
as expected when Kuparek sand was entered.
Circulated at 16754.0 ft
Circulate 2 ea lo-vis/hi-vis sweeps around for 200%
btms up per well plan program. Cycle and down link
Anadrils MWD/LWD tools.
Obtained clean returns - 200.00 % hole volume
Pulled out of hole to 10800.0 ft
POH. Tigh at 11550 with overpull to 50K, and 8081
with overpull to 50K.
Pulled out of hole to 10800.0 ft
POH wet first 10 stands. Monitor hole fill every
stand for first 5 stands. OK. Pump slug. Continue
to POH. Drag to 310 klb.
BHA run no. 6 (cont...)
Pulled out of hole to 543.0 ft (cont...)
POH wet first 10 stands. Monitor hole fill every
Facility
West Beach
Progress Report
Well WB-05A Page 22
Rig POOL 6 Date 11 August 99
Date/rime
10:00
10:00-11:00
11:00
11:00-11:15
11:15
11:15-14:30
14:30
14:30-16:30
16:30
16:30-06:00
16:30-19:30
19:30
19:30-00:00
20 Nov 97 00:00
00:00-01:30
01:30
01:30-05'15
05:15
05:15-06:00
06:00-06:00
06:00-07:00
07:00
07:00-07:30
07:30
07:30-08:00
08:00
08:00-09:00
09:00
09:00-10:30
10:30
10:30-11'30
11:30
11:30-13:00
Duration
1 hr
1/4 hr
3-1/4 hr
2 hr
13-1/2 hr
3 hr
4-1/2 hr
1-1/2 hr
3-3/4 hr
3/4 hr
24 hr
1 hr
1/2 hr
1/2 hr
1 hr
1-1/2 hr
1 hr
1-1/2 hr
Activity to POH. Drag to 310 klb.
At BHA
Pulled BHA
Stopped · To hold safety meeting
Held safety meeting
Prejob safety meeting topic: "Unloading radioactive
source"
Completed operations
Downloaded MWD tool
Completed operations
Pulled B HA
Continue to pull to bit. Bit lost cone #3.
Graded 6 / 8 / LC / 3 / F / 5/16" / JD / PR
Laid out LWD tools.
BHA Laid out
BHA run no. 7
Made up BHA no. 7
Pick up 3 ea drill collars. W.O. RCJB from
Tristate. Make up RCJB and crossovers.
BHA: RCJB, DPXO, DBXO, 3 x DC, 2 x Flex DC, XO,
x HWDP, Jars, 6 x HWDP
BHA no. 7 made up
R.I.H. to 6600.0 ft
At 9-5/8in casing shoe
Serviced Block line
Cut drilling line. Rig up circ head and break circ
while working on line.
Equipment work completed
R.I.H. to 14000.0 ft
Tight spot at 9725.
Stopped · To circulate
Circulated at 14000.0 ft
Precautionary circulation.
BHA run no. 7 (cont...)
Circulated at 14000.0 ft (cont...)
Precautionary circulation.
Broke circulation
R.I.H. to 15010.0 ft
Tight. Stood up 20K.
Began precautionary measures
Worked toolstring at 15010.0 ft
Rig up to circualte and try to work pipe through.
No go.
Began precautionary measures
Pulled out of hole to 14730.0 ft
POH laying down 9 jts DP .'
At top of check trip interval
Reamed to 15100.0 ft
Run stand to 15010. Pick up Kelly and ream to
15100 ....
Completed precautionary measures
R.I.H. to 16638.0 ft
Continue to RIH with no tight spots until 16638
Began precautionary measures
Reamed to 16678.0 fl
Tight~--'-.u,~ at ,.-~o ............ '-pipe -'
1 UU3 o o
Facility
Date/Time
21 Nov 97
West Beach
13:00
13:00-15:30
15:30
15:30-23:00
23:00
23:00-06:00
06:00-11:00
06:00-10:00
10:00
10:00-11:00
11:00
11:00-06:00
Duration
Progress Report
2-1/2 hr
Well WB-05A Page 23
Rig POOL6 Date 11 August 99
7-1/2 hr
7 hr
5 hr
4 hr
1 hr
19hr
11:00-12:00 1 hr
12:00
12:00-15:00 3 hr
15:00
15:00-17:00 2 hr
17:00
17:00-18:00 1 hr
18:00
18:00-01:00 7 hr
22 Nov 97 01:00
01:00-06:00 5 hr
01:00-06:00 5 hr
06:00-01:30
06:00-08:00
08:00
08:00-11:00
11:00
11:00-12:00
12:00
12:00-12:30
19-1/2 hr
2 hr
3 hr
1 hr
1/2 hr
Activity Observed torque and overpull suggesting junk above the
Began precautionary measures
Worked toolstring at 16168.0 ft
POH to get above junk. Work tight pipe to 16168
until up drag indicated normal.
Pipe came free
Reamed to 16710.0 fl
Ream and single in from 16168 with 0 - 5 WOB. Stood
up 70K at 16710. Could not ream through undergauge
hole.
Completed precautionary measures
Pulled out of hole to 9000.0 ft
BHA run no. 7 (cont...)
Pulled out of hole to 522.0 ft (cont...)
At BHA
Pulled BHA
Break down RCJB. No cone recovery. Recovered
formations rocks (siltstone). Lost 13 catcher fingers.
BHA Stood back
BHA run no. 8
Made up BHA no. 8
Pick up Junk Mill and Junk Sub.
BHA no. 8 made up
R.I.H. to 6543.0 ft
At 9-5/8in casing shoe
Serviced Block line
Cut 127.5' drill line, slip 127'. Adjust drawworks
brakes. Grease swivel packing. Service rig.
Equipment work completed
Serviced SCR
Rig repair. Work on faulty SCR assignment for
drawworks A motor.
Equipment work completed
R.I.H. to 16638.0 ft
RIH with no hole problems.
Began precautionary measures
Reamed to 16710.0 ft
Ream and work pipe through tight spot at 16700 ~
16710.
Reamed to 16710.0 fl
Work and Ream tight hole at 16700 - 16710. Broke
through and ream to bottom at 16754.
BHA run no. 8 (cont...)
Reamed to 16710.0 ft (cont...)
Work and Ream tight hole at 16700 - 16710. Broke
through and ream to bottom at 16754.
On bottom
Milled Other sub-surface equipment at 16759.0 ft
Mill on junk 16754 - 61759.
Completed operations
Circulated at 16759.0 ft
Circ high-vis high-weight sweep.
Obtained bottoms up (100% annulus volume)
Worked toolstring at 16759.0 fl
Work pipe in tight reamed hole 16754 - 16759. Pump
Facility
Date/Time
West Beach
12:30
12:30-21:00
21:00
21:00-22:00
22:00
22:00-01:30
23 Nov 97 01:30
01:30-06:00
01:30-06:00
01:30-06:00
06:00-06:00
06:00-06:30
06:30
06:30-11:30
11:30
11:30-13:30
13:30
13:30-14:30
14:30
14:30-19:30
19:30
19:30-01:00
24 Nov 97 01:00
01:00-06:00
06:00-06:00
06:00-01:00
Progress Report
Well WB-05A Page 24
Rig POOL6 Date 11 August 99
Duration
Activity
1/2 hr
1 hr
3-1/2 hr
4-1/2 hr
4-1/2 hr
4-1/2 hr
24 hr
1/2 hr
5 hr
2 hr
1 hr
5 hr
5-1/2 hr
5 hr
24 hr
19hr
Completed operations
Pulled out of hole to 520.0 ft
No hole problems or above normal overpull.
At B HA
Pulled BHA
Lay down spiral drill collars. Recover approx 2 - 3
lb of cone pieces, teeth, gauge protection, and
mill cutting matrix from junk sub. Mill 100% used
up.
At Surface · 0.0 ft
Tested BOP stack
Weekly BOP test. Witness by State Inspector waived
by Chuck Scheve via telephone.
Pressure test completed successfully - 5000.000 psi
Low and high test of Annular, Rams, HCR valves,
choke manifold, and kell cocks·
BHA run no. 9
Made up BHA no. 9
Surface test MWD LWD tools· No good POH to repair
Made up BHA no. 9
Pick up HTC GT-PSG1 mill tooth bit, motor, and
MWD/LWD tools.
BHA run no. 9 (cont...)
Made up BHA no. 9 (cont·.·)
Pick up HTC GT-PSG1 mill tooth bit, motor, and
MWD/LWD tools·
MWDFLWD failed - Change operation
Serviced Drilling tool / logs
Down time: Break down tools· Check probes and
reinstall.
Verify that tools will log and record data. Rerun
and repeat surface test. No good.
Equipment work completed
R.I.H. to 6590.0 ft
Continue in hoel with MWD/LWD with no real time
data for DEN/NEU
At 9-5/8in casing shoe
Serviced Drillstring handling equipment
Service and lube rig.
Equipment work completed
R.I.H. to 16657·0 ft
RIH with no hole problems. Lay down 5 joints DP to
ream.
Began precautionary measures
Reamed to 16755.0 fl
Ream undergauge hole. Work and ream several times
at cap at 16700 - 16708. Stabilizers hanging up.
On bottom
Drilled to 16822.0 ft
Drill to TD. Miluveach at 16853 MD est 9052 TVD, TD
at 17041 MD est 9206 TVD.
BHA run no. 9 (cont...)
Drilled to 17041.0 ft (cont...)
Drill to TD "~:' ....... ,. ~. ,~o~-, ,, ~,--, _~. ~,,~ ~-,,,-, ~
Facility
Date/Time
25 Nov 97
26 Nov 97
27 Nov 97
West Beach
01:00
01:00-03:30
03:30
03:30-04:30
04:30
04:30-05:30
05:30
05:30-06:00
05:30-06:00
06:00-22:00
06:00-09:30
09:30
09:30-19:00
19:00
19:00-22:00
22:00
22:00-01:00
22:00-01:00
O1:00
01:00-06:00
O1:00-06:00
06:00-06:00
06:00-06:30
06:30
06:30-12:30
12:30
12:30-14:30
14:30
14:30-01:00
01:00
O1:00-06:00
06:00
06:00-06:00
06:00-06:30
06:30
06:30-18:00
Progress Report
Well WB-05A Page 25
Rig POOL 6 Date 11 August 99
Duration
2-1/2 hr
1 hr
1 hr
1/2 hr
1/2 hr
16hr
3-1/2 hr
9-1/2 hr
3 hr
3 hr
3 hr
5 hr
5 hr
24 hr
1/2 hr
6 hr
2 hr
10-1/2 hr
5 hr
24hr
1/2 hr
11-1/2 hr
Activity at 17041 MD est 9206 TVD.
Reached planned end of run - Section / well T.D.
Circulated at 17041.0 ft
Circulate hole clean.
Obtained clean returns - 170.00 % hole volume
Pulled out of hole to 15832.0 ft
Check trip new hole. No problems.
At Top of new hole section: 15832.0 ft
R.I.H. to 17041.0 ft
On bottom
Circulated at 17041.0 ft
Circ Low & High Vis Sweeps.
Circulated at 17041.0 ft
Circulate bottoms up with hi-vis sweep.
BHA run no. 9 (cont...)
Circulated at 17041.0 ft (cont...)
Circulate bottoms up with hi-vis sweep.
Hole swept with slug - 200.00 % hole volume
Pulled out of hole to 520.0 ft
Drag and torque recorded every 1000'.
At BHA
Pulled BHA
Laydown MWD/LWD tools and motor
BHA Laid out
Suspend operations
Flow check
Wait on Schlumberger. Observe well while
maintaining hole fill by trip tank.
Observed well static
Electric wireline work
R.I.H. to 5000.0 ft
Rig up and RIH with DPC logs.
Electric wireline work (cont...)
Held safety meeting
PJSM=TOPIC=DRIFT PIPE IN DERRICK.
Completed .operations
R.I.H. to 8000.0 ft
RIH W/LOGGING TOOLS @ 1000 FPH=DRIFT DRILL
PIPE-FILL PIPE EVERY 3000'.
Stopped: To circulate
Circulated at 8000.0 ft
CIRC=WHILE HANGING WL SHEAVE.
Obtained bottoms up (100% annulus volume)
R.I.H. to 15277.0 ft
RIH W! 5" DP TO 15277.
Began precautionary measures
Conducted electric cable operations
INSTALL SIDE ENTRY SUB & RUN WL IN HOLE.
Began precautionary measures
Electric wireline work (cont...)
Held safety meeting
PJSM-TOPIC=WL OPERATIONS.
Completed operations
Conducted electric cable operations
RIH W/LOGGING TOOLS=RUNNING RFT.S @ VARIOUS
DE~ ,~S.
Facility
Date/Time
28 Nov 97
29 Nov 97
Progress Report
West Beach
Well WB-05A Page 26
Rig POOL6 Date 11 August 99
18:00
18:00-18:30
18:30
18:30-22:30
22:30
22:30-02:30
02:30
02:30-06:00
06:00
06:00-16:30
06:00-08:00
08:00
08:00-10:00
10:00
10:00-14:00
14:00
14:00-16:30
16:30
16:30-06:00
16:30-21:00
21:00
21:00-23:00
23:00
23:00-00:30
00:30
00:30-05:00
05:00
05:00-06:00
06:00
06:00-10:00
06:00-09:00
09:00
09:00-09:30
09:30
09:30-10:00
Duration
1/2 hr
4 hr
4 hr
3-1/2 hr
10-1/2 hr
2 hr
2 hr
4 hr
2-1/2 hr
13-1/2 hr
4-1/2 hr
2 hr
1-1/2 hr
4-1/2 hr
1 hr
4 hr
3 hr
1/2 hr
1/2 hr
Activity
Began precautionary measures
Held safety meeting
PJSM-TOPIC=WL OPERATIONS.
Completed operations
Conducted electric cable operations
FINISH LOGGING=BREAK OUT WL ENTRY GUIDE & RIG
DOWN
SWS.
Began precautionary measures
Circulated at 15100.0 ft
CBU-FLOW CHECK.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 10500.0 ft
POH W/LOGGING TOOLS.
Stopped · To hold safety meeting
Electric wireline work (cont...)
Pulled out of hole to 6600.0 ft
POH W/LOGGING TOOLS.
Stopped · To service drilling equipment
Serviced Block line
SERVICE RIG & CUT DRLG. LINE.
Line slipped and cut
Pulled out of hole to 0.0 ft
LAY DOWN 34 JTS. 5" DP & FINISH POH.
At BHA
Rigged down sub-surface equipment - Formation logs
LAY DOWN LOGGING TOOLS.
Equipment work completed
Drillpipe. 5in workstring run
Ran Tubing to 1262.0 ft (3-1/2in OD)
RIG UP HANDLING TOOLS & PICK UP 40 JTS. 3.5" TBG.
W/MULE SHOE. & RUN SAME.
Began precautionary measures
Ran Drillpipe in stands to 6600.0 ft
RIH W/3.5" TBG. & 5" DP TO 9 5/8" SHOE.
Stopped · To circulate
Circulated at 6600.0 ft
CIRC. CAPACITY OF 5" DP & 3.5" TBG.
Obtained bottoms up (100% annulus volume)
Ran Drillpipe in stands to 17041.0 ft
On bottom
Circulated at 17041.0 ft
RIG UP TO CIRCULATE & CIRC. PRIOR TO LAYING 18#
PILL.
Broke circulation
5in. Drillpipe workstring run (cont...)
Circulated at 17041.0 ft
PJSM=CBU-FLOW CHECK.
Obtained bottoms up (100% annulus volume)
Circulated at 17041.0 ft
SPOT 18# PILL F/16000 TO 17041.=FLOW CHECK.
Heavy slug spotted downhole
Laid down 156.0 ft of Drillpipe
t A 1~' l'~t'~lI/q~T Trl'~O ~'~, hr} BT Tm I
,.~ · ,_.,,_, .... 5o ~o..~ ...... .G UP .~...S.
Facility
West Beach
Progress Report
Well WB-05A Page 27
Rig POOL 6 Date 11 August 99
Date/Time
10:00
10:00-18:30
10:00-11:30
11:30
11:30-13:00
13:00
13:00-15:00
15:00
15:00-18:00
18:00
18:00-18:30
18:30
18:30-06:00
18:30-03:00
30 Nov 97 03:00
03:00-06:00
06:00
06:00-06:30
06:00-06:30
06:30
06:30-06:00
06:30-08:00
08:00
08:00-16:00
16:00
16:00-22:30
22:30
22:30-06:00
01 Dec 97 06:00
06:00-06:00
06:00-09:00
09:00
Duration
8-1/2 hr
1-1/2 hr
1-1/2 hr
2 hr
3 hr
1/2 hr
11-1/2 hr
8-1/2 hr
3 hr
1/2 hr
1/2 hr
23-1/2 hr
1-1/2 hr
8 hr
6-1/2 hr
7-1/2 hr
24 hr
3 hr
Activity
Completed operations
Cement: Abandonment plug
Mixed and pumped slurry - 76.000 bbl
PJSM=PUMP 10 BBL. WATER =TEST LINES TO 3000g--PUM
BBL. WATER & 76 BBL. CEMENT AS PER PROGRAM. SPO'
BALANCED PLUG W/MULE SHOE @ 16883.
Cement pumped
Circulated at 15836.0 ft
PULL 11 STANDS DP SLOW & CBU.
Obtained bottoms up (100% annulus volume)
Mixed and pumped slurry - 95.000 bbl
MIX & PUMP 95 BBL. SLURRY AS PER PROGRAM=DISPL?
SAME TO TO 15836.
Cement pumped
Circulated at 14430.0 ft
PULL 15 STANDS 5" DP TO 14430=DROP WIPER PLUG &
CIRC. @ 11 BPM TO CLEAN CEMENT OUT OF DP. (SPILL
DRILL-AMAS-4 MINS.)
Stopped: To hold safety meeting
Held safety meeting
PJSM=TOPIC=ROTARY SAFETY.
Completed operations
Pull Drillpipe, 5in O.D.
Pulled Drillpipe in stands to 1268.0 ft
FLOW CHECK-PUMP PILL & POH.-(D1) DRILL @ 2040
AMAS-2 MINS.
Completed operations
Laid down 1268.0 ft of Tubing
RIG UP HANDLING EQUIP. & LAY DOWN 40 JTS. 3 1/2"
TBG.
Completed operations
Pull Drillpipe, 5in O.D. (cont...)
Held safety meeting
PJSM-TOPIC=TRIPPING (SERVICE RIG)
Completed operations
BHA run no. 10
Made up BHA no. 10
BHA no. 10 made up
R.I.H. to 14555.0 fl
RIH-BREAK CIRC. @ 6630-& 11325=TIGHT HOLE @ 14524.
At Top of fill: 14555.0 ft
Washed to 15042.0 ft
WASH & REAM CEMENT STRINGERS
At Top of cement: 15042.0 fl
Drilled cement to 15317.0 ft
TAG FIRM CEMENT @ 15042 (DRLG. CEMENT F/15042 TO
15317.)
Stopped: To hold safety meeting
BHA run no. 10 (cont...)
Drilled cement to 15400.0 ft
PJSM-TOPIC=TRIPPING=DRLG. FIRM CEMENT F/15317 T(
15400.
At Setting depth: 15400.0 ft
P5
P
,CE
Facility
Datefrime
02 Dec 97
03 Dec 97
Progress Report
West Beach
Well WB-05A Page 28
Rig POOL6 Date 11 August 99
09:00-10:30
10:30
10:30-12:00
12:00
12:00-13:00
13:00
13:00-14:30
14:30
14:30-14:45
14:45
14:45-18:00
18:00
18:00-18:30
18:30
18:30-23:00
23:00
23:00-01:30
01:30
01:30-06:00
06:00
06:00-16:00
06:00-06:30
06:30
06:30-16:00
16:00
16:00-06:00
16:00-18:00
18:00
18:00-18:30
18:30
18:30-19:30
19:30
19:30-06:00
06:00
06:00-06:00
06:00-06:30
06:30
06:30-07:00
Duration
1-1/2 hr
1-1/2 hr
1 hr
1-1/2 hr
114 hr
3-1/4 hr
1/2 hr
4-1/2 hr
2-1/2 hr
4-1/2 hr
10hr
1/2 hr
9-1/2 hr
14hr
2 hr
1/2 hr
1 hr
10-1/2 hr
24 hr
1/2 hr
1/2 hr
Activity
Circulated at 15400.0 ft
PUMP HI VIS SWEEP & CBU.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 13000.0 ft
FLOW CHECK & POH TO 13000'-BOBBLE @ 14424.
At top of check trip interval
R.I.H. to 15400.0 ft
RIH=LITTLE TIGHT @ 13992.
On bottom
Circulated at 15400.0 ft
CBU=SPOT 3% LUBE TEX PILL ON BOTTOM-TO 14000.
Obtained bottoms up (100% annulus volume)
Held drill (Spill)
AMAS-3 MINS.
Completed operations
Laid down 1800.0 ft of 5in OD drill pipe
Stopped: To hold safety meeting
Held safety meeting
PJSM-TOPIC=LAYING DOWN DP.
Completed operations
Laid down 3000.0 ft of 5in OD drill pipe
Handling equipment failed - Change operation
Serviced Handling equipment
REPAIR LAY DOWN MACHINE.
Equipment work completed
Laid down 4100.0 ft of 5in OD drill pipe
Stopped: To hold safety meeting
BHA run no. 10 (cont...)
Held safety meeting
PJSM=TOPIC=L/D 5" DP.
Completed operations
Laid down 6800.0 ft of 5in OD drill pipe
FINISH LAYING DOWN DP=RIH 27 STANDS-LAY DOWN
SAME-LAY DOWN BHA.
At BHA
Run Casing, 7in O.D.
Rigged up Bottom ram
PULL WEAR BUSHING & CHANGE BOTTOM RAMS TO 7".
Stopped: To hold safety meeting
Held safety meeting
PJSM=TOPIC=RUNNING 7" CSG.
Completed operations
Rigged up Bottom ram
FINISH INSTALLING BOTTOM 7" RAMS & TEST SAME.
Equipment work completed
Ran Casing to 6200.0 ft (7in OD)
RUNNING 7" CSG.
Stopped: To hold safety meeting
Run Casing, 7in O.D. (cont...)
Held safety meeting
PJSM=TOPIC=RUNNING 7" CSG. & WORKING PIPE SHED.
Completed operations
Circulated at 6200.0 ft
CIRC. CAPACITY OF CSG.
Facility West Beach
Progress Report
Well WB-05A Page 29
Rig POOL6 Date 11 August 99
Date/Time
07:00
07:00-10:30
10:30
10:30-18:00
18:00
18:00-18:30
18:30
18:30-23:00
23:00
23:00-06:00
04 Dec 97 06:00
06:00-04:00
06:00-12:00
12:00
12:00-01:30
05 Dec 97 01:30
01:30-03:00
03:00
03:00-04:00
04:00
04:00-06:00
04:00-06:00
06:00
06:00-12:00
06:00-12:00
12:00
12:00-18:30
Duration
3-1/2 hr
7-1/2 hr
1/2 hr
4-1/2 hr
7 hr
22 hr
6 hr
13-1/2 hr
1-1/2 hr
1 hr
2 hr
2 hr
6 hr
6 hr
6-1/2 hr
Activity
Obtained bottoms up (100% annulus volume)
Ran Casing to 9155.0 ft (7in OD)
RUNNING 7" CSG. =PICK UP AFI'ER MAKING UP JT.=WO[
NOT BREAK LOOSE UP OR DOWN=APPEARS DIFFERENT
STUCK.
Got stuck whist pipe stationary
Worked stuck pipe at 9155.0 ft
WORK PIPE=BUILD LUBE TEX CONTENT F/3% TO 5%=L£
MUD WT. TO 9.8=WORK PIPE TO 480K=80% 26# L-80
BUTTRESS=WHILE MIXING 100 BBL. SFT PILL.
Began precautionary measures
Held safety meeting
PJSM=TOPIC=WORKING TIGHT PIPE. (STAY OFF FLOOR.)
Completed operations
Worked stuck pipe at 9155.0 ft
WORK PIPE WHILE MIXING SFT PILL.
Began precautionary measures
Circulated at 9155.0 ft
SPOT 100 BBL. SFT PILL=50 BBL. IN PIPE=50 BBL. IN
ANNULUS.=MOVE 1/2 BBL. EVERY 15 MINS.=STRING SE~I
220K.
Pipe release agent spotted downhole
Stuck 7in Casing
Worked stuck pipe at 9155.0 fl
HOLDING 220K ON 7" CSG. W/SFT SPOTTED.=MOVE 1/2
BBL. EVERY 15 MINS.
Began precautionary measures
Worked stuck pipe at 9155.0 fl
WORK PIPE 480K UP-50K DOWN.
Began precautionary measures
Circulated at 9155.0 ft
CIRC. OUT SFT PILL-CONDITION HOLE F/CEMENT.
Obtained bottoms up (100% annulus volume)
Held safety meeting
RIG UP HES CEMENT HEAD=HOLD SAFETY MEETING W/
CREW
& HES.
Completed operations
Cement: Casing cement
Mixed and pumped slurry - 25.000 bbl
MIX & PUMP SPACER-PREFLUSH & CEMENT AS PER
PROGRAM=BUMP PLUG W/3000~. FLOATS HELD OK.
Cement pumped
Cement: Casing cement (cont...)
Wait on cement
PJSM=TOPIC=N/D=N/U=PREPARE CELLAR FOR N/D=CLE~
CSG. OUT OF PIPE SHED=LOAD 4" DP IN PIPE SHED=WHI]
WOC.
Began precautionary measures
Nipple down BOP stack
LD
~WER
~R 7"
_,E
Facility West Beach
Date/Time
12:00-18:00
18:00
18:00-18:30
18:30
18:30-02:00
18:30-02:00
06 Dec 97 02:00
02:00-06:00
02:00-06:00
06:00
06:00-13:00
06:00-13:00
07 Dec 97
13:00
13:00-06:00
13:00-14:30
14:30
14:30-18:00
18:00
18:00-18:30
18:30
18:30-20:00
20:00
20:00-21:30
21:30
21:30-01:00
01:00
01:00-02:00
02:00
02:00-06:00
06:00
06:00-06:00
06:00-06:30
06:30
06:30-09:00
Progress Report
Well WB-05A Page 30
Rig POOL6 Date 11 August 99
Duration
6 hr
1/2 hr
7-1/2 hr
7-1/2 hr
4 hr
4 hr
7 hr
7 hr
17hr
1-1/2 hr
3-1/2 hr
1/2 hr
1-1/2 hr
I- 1/2 hr
3-1/2 hr
1 hr
4 hr
24 hr
1/2 hr
2-1/2 hr
Activity
Rigged down BOP stack
N/D FLOW LINE-CHOKE LINE-KILL LINE=P/U BOP & SET
EMERGENCY SLIPS.
Stopped: To hold safety meeting
Held safety meeting
PJSM-TOPIC=WORKING IN CELLAR.
Completed operations
Nipple up BOP stack
Rigged up BOP stack
SET SLIPS & CUT 7" CSG.-DRAIN SAME-REFACE 7" CSG.
CUT=N/U SPOOL-SET PACKOFF -TEST SAME TO 35004-N£
BOPE.=CHANGE TOP RAMS TO 4" & BOTTOM TO 3 1/2" X
6" VARIABLE.
Equipment work completed
Test well control equipment
Tested BOP stack
LAY DOWN CSG. SPIDER & ELEVATORS=CHANGE OUT
KELLYS=CHANGE BUSHING ROLLERS IN KELLY & SET
SAME=P/U
TEST JT=SET TEST PLUG.
Began precautionary measures
Test well control equipment (cont...)
Tested BOP stack
PJSM=TEST BOPE 250-5000#=LAY DOWN TEST JT. & RUN
WEAR BUSHING.
Function test completed satisfactorily
BHA run no. 11
Made up BHA no. 11
BHA no. 11 made up
Singled in drill pipe to 3000.0 ft
PFU & M/U 4" DP.
Stopped: To hold safety meeting
Held safety meeting
PJSM=TOPIC=PICKING UP DP.
Completed operations
Singled in drill pipe to 4000.0 ft
Stopped: To service drilling equipment
Serviced Block line
SLIP & CUT DRLG. LINE=SERVICE RIG.
Line slipped and cut
Singled in drill pipe to 8995.0 ft
At Top of cement: 8995.0 ft
Circulated at 8995.0 ft
CIRC. & TEST 7" CSG. TO 35004 30 MINS.. OK
Obtained bottoms up (100% annulus volume)
Drilled cement to 9150.0 ft
DRLG. PLUGS-CEMENT-FLOAT COLLAR-& FLOAT SHOE.
Stopped: To hold safety meeting
BHA run no. 11 (cont...)
Circulated at 9150.0 ft
CIRC. HOLE CLEAN-DURING SAFETY MEETING.
Obtained bottoms up (100% annulus volume)
Held drill (Kick (well kill))
WELL KILL DRILL BEFORE DRLG. SHOE. (BLOW DOWN
& CIIOKE LD~S.)
IACK
Facility West Beach
Date/Time
09:00
09:00-11:00
11:00
11:00-13:00
13:00
13:00-14:30
14:30
14:30-15:30
15:30
15:30-18:00
18:00
18:00-21:00
21:00
21:00-00:00
08 Dec 97 00:00
00:00-05:30
05:30
05:30-06:00
06:00
06:00-18:00
06:00-08:30
08:30
08:30-16:00
16:00
16:00-17:00
17:00
17:00-18:00
18:00
18:00-06:00
18:00-21:30
21:30
21:30-04:00
09 Dec 97 04:00
04:00-06:00
Progress Report
Well WB-05A Page 31
Rig POOL6 Date 11 August 99
Duration
2 hr
2 hr
1-1/2 hr
1 hr
2-1/2 hr
3 hr
3 hr
5-1/2 hr
1/2 hr
12hr
2-1/2 hr
7-1/2 hr
1 hr
1 hr
12 hr
3-1/2 hr
6-1/2 hr
2 hr
Activity
Completed operations
Circulated at 9250.0 ft
CIRC.-CLEAN OUT TO 9250.
Broke circulation
Singled in drill pipe to 10818.0 ft
P/U 4" DP TO 10818.
Stopped: To circulate
Circulated at 10818.0 ft
CIRC.-CONDITION MUD.
Obtained bottoms up (100% annulus volume)
Singled in drill pipe to 12830.0 ft
PFU 4" DP TO 12830.
Stopped: To circulate
Circulated at 12830.0 ft
CIRC.-CONDITION MUD-MIX LCM-HOLE TAKING
40
BPH.-STOP PUMPS-HOLE STATIC.
Obtained bottoms up (100% annulus volume)
Singled in drill pipe to 15161.0 ft
PJSM-P/U 4" DP TO 15161.
At Top of fill: 15161.0 ft
Washed to 15201.0 ft
TAG FILL @ 1516 i=CLEANING OUT SAME TO 15201.
IS VERY FIRM).
Stopped: To circulate
Circulated at 15201.0 ft
CONDITION MUD F/DRLG.-ADD LUBE TEX TO LOWER
TORQUE-EQUALIZE MUD WT. @ 10.3# F/CABANA
FORMATION.
Obtained bottoms up (100% annulus volume)
Flow check
MIX & PUMP PILL=FLOW CHECK.
Observed well static
BHA run no. 11 (cont...)
Circulated at 15201.0 ft
CIRC. & COND. MUD-PUMP PILL & FLOW CHECK.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 0.0 ft
POH-HOLE IN GOOD COND.
At BHA
Pulled BHA
BHA Laid out
Serviced Drillfloor / Derrick
Equipment work completed
BHA run no. 12
Made up BHA no. 12
MAKE UP BHA & 5 STDS. DP=TEST ANADRILL TOOLS.
BHA no. 12 made up
R.I.H. to 15243.0 ft
RIH-FILLING PIPE EVERY 5000'=42' CORRECTION ON
STRAP=TO 15243.
At Top of fill: 15243.0 ft
Washed to 15265.0 ft
Facility West Beach
Date/Time
06:00
06:00-06:00
06:00-08:30
08:30
08:30~18:00
18:00
18:00-21:30
10 Dec 97
21:30
21:30-22:30
22:30
22:30-06:00
06:00
06:00-06:30
06:00-06:30
06:30
06:30-06:00
06:30-10:00
10:00
10:00-11:00
11:00
11:00-17:30
17:30
17:30-18:00
18:00
18:00-06:00
18:00-06:00
11 Dec 97 06:00-06:00
06:00-03:30
Progress Report
Well WB-05A Page 32
Rig POOL 6 Date 11 August 99
Duration
24 hr
2-1/2 hr
9-1/2 hr
3-1/2 hr
1 hr
7-1/2 hr
1/2 hr
1/2 hr
23-1/2 hr
3~ 1/2 hr
hr
1/2 hr
1/2 hr
12hr
12hr
24 hr
21-1/2 hr
Activity TO
Stopped · To hold safety meeting
BHA run no. 12 (cont...)
Washed to 15405.0 ft
PJSM=CLEAN OUT F/15265 TO 15405.
At Kick off depth · 15405.0 ft
Drilled to 15466.0 ft
ATTEMPTING SLIDE TO DROP ANGLE-HANGING UP WHI[.E
SLIDING-ROTATE PART WAY=ADD LUBETEX TO 6% IN I~IUD
SYSTEM.
Stopped: To hold safety meeting /
Drilled to 15475.0 ft
PJSM=DRLG.-SLIDE & ROTATE=F/15466 TO 15475.=UNABLE
TO SLIDE.
Stopped · To circulate
Circulated at 15475.0 ft
MIX & PUMP PILL.-FLOW CHECK.
Heavy slug spotted downhole
Pulled out of hole to 0.0 fl
POH=HOLE IN GOOD CONDITION=DOWN LOAD SOURCE
At BHA
BHA run no. 12 (cont...)
Pulled BHA
Lay down stablizer & motor - down load MWD
BHA Stood back
BHA run no. 13
Made up BHA no. 13
Pick up 4 3/4" Anadrill motor without stablizer,
Make up HTC 6" STR -09D buttom bit, Load Source &
Orient MWD - BHA slick, no stablizers to improve
sliding ability
BHA no. 13 made up
Serviced Block line
Line slipped and cut
R.I.H. to 15445.0 ft
Surface test MWD, Ok - TIH, Fill pipe every 4000
ft. - no problem
On bottom
Reamed to 15475.0 fl
precautionary ream 30' to bottoms at 15475' - no
problem
On bottom
Drilled to 15650.0 ft
Directional drill 15475 to 15650' at 0600 hrs, Art
2 hrs, Asr 8.5 hrs, Average Rop 16.6 ft/hr -
Difficulty sliding, drill string hanging up, Can not get
wt. to bit
Drilled to 15650.0 ft
Directional drill 15650 to 16027' Art 4.75 hrs,
Ast 9.25 hrs, Average Rop 27 ft/hr - Drop angle to 45
degress & start turning well to right, turn 60
Azimuth to 80 Azimuth at end of run - bit Rop down to
16 ft/hr rotating at end of run
BHA run no. 13 (cont...)
Drilled to 16027.0 ft (cont...)
: .... :__~ ~_:. ~ ~n I Art m~,,
Ullll L~I U U/.~- I
Facility West Beach
Date/Time
12 Dec 97 03:30
03:30-06:00
06:00
06:00-13:00
06:00-11:00
11:00
11:00-13:00
13:00
13:00-06:00
13:00-14:30
14:30
14:30-20:00
20:00
20:00-21:00
21:00
21:00-06:00
21:00-06:00
13 Dec 97 06:00-06:00
06:00-04:30
14 Dec 97 04:30
04:30-06:00
04:30-06:00
06:00-13:30
06:00-06:30
06:30
06:30-11:30
Progress Report
Well WB-05A Page 33
Rig POOL 6 Date 11 August 99
Duration
2-1/2 hr
7 hr
5 hr
2 hr
17 hr
1-1/2 hr
5-1/2 hr
1 hr
9 hr
9 hr
24 hr
22-1/2 hr
1-1/2 hr
1-1/2 hr
7-1/2 hr
1/2 hr
5 hr
Activity Ast 9.25 hrs, Average Rop 27 ft/hr - Drop angle to 45
Reached planned end of run - Maximum hours on bit
Circulated at 16027.0 ft
Circulate around low/high vis sweep - monitor well
- pump slug - set back kelly - Prepare to pooh for
bit
Obtained clean returns - 100.00 % hole volume
BHA run no. 13 (cont...)
Pulled out of hole to 192.0 ft
Pooh for new bit, no problem
At BHA
Pulled BHA
Remove source, Down load MWD,
BHA Stood back
BHA run no. 14
Made up BHA no. 14
Change bit, Check orientation of MWD, Function test
MWD & motor- ok
BHA no. 14 made up
R.I.H. to 15949.0 ft
TIH, fill pipe every 3000' - no problem
Began precautionary measures
Reamed to 16027.0 ft
Precautionary ream 15949 to bottom at 16027' - 5'
of fill
On bottom
Drilled to 16204.0 ft
Directional drill 16027 to 16204' at 0600 hrs, Art
1.75 hrs, Ast 4.0 hrs, Average Rop 30.7 ft/hr -
Slide at 20 ft/hr, rotate at 40-50 ft/hr - build angle
& turn to right as per directional plan
Drilled to 16204.0 ft
Directional drill 16204 to 16676' Art 6.5 hrs, Ast
9.0 hrs, Average Rop 30.45 ft/hr ~ Line direction
up for PDC bit run, Anticipate PDC to walk to left,
Azimuth at 91 degrees, Angle at 72 degrees on
bottom
BHA run no. 14 (cont...)
Drilled to 16676.0 ft (cont...)
Directional drill 16204 to 16676' Art 6.5 hrs, Ast
9.0 hrs, Average Rop 30.45 fi/hr - Line direction
up for PDC bit run, Anticipate PDC to walk to left,
Azimuth at 91 degrees, Angle at 72 degrees on
bottom
Reached planned end of run - Maximum hours on bit
Circulated at 16676.0 ft
Circulate around high vis sweep
Circulated at 16676.0 ft
Monitor well- pump slug- set back kelly
BHA run no. 14 (cont...)
Circulated at 16676.0 ft (cont...)
Monitor well- pump slug- set back kelly
Obtained clean returns - 100.00 % hole volume
Pulled out of hole to 192.0 ft
Pooh for PDC bit - no problem
Facility
Date/Time
15 Dec 97
West Beach
Progress Report
Well WB-05A Page 34
Rig POOL6 Date 11 August 99
11:30
11:30-13:30
13:30
13:30-18:00
13:30-14:30
14:30
14:30-17:30
17:30
17:30-18:00
18:00
18:00-06:00
18:00-22:00
22:00
22:00-03:00
03:00
03:00-04:00
04:00
04:00-06:00
04:00-06:00
06:00-06:00
06:00-07:00
07:00
07:00-10:00
10:00
10:00-06:00
10:00-06:00
Duration
2 hr
4-1/2 hr
1 hr
3 hr
1/2 hr
12hr
4 hr
5 hr
1 hr
2 hr
2 hr
24 hr
1 hr
3 hr
20 hr
20 hr
Activity
At BHA
Pulled BHA
Remove source, Down load MWD - Break bit, Stand
back BHA
BHA Stood back
Test well control equipment
Retrieved Wear bushing
Pull wear bushing, Rig up to test BOP
Equipment work completed
Tested BOP stack
Test BOP: Test all rams, lines & valves to 250 low
& 5000 psi high, Test Hydrill 250 & 3500 psi, Test
upper & lower kelly valves, TIW & IBOP to 250 &
5000 psi - Witness of BOP test waived by Larry Wade of
AOGCC
Pressure test completed successfully - 5000.000 psi
Installed Wear bushing
Eqpt. work completed, running tool retrieved
BHA run no. 15
Made up BHA no. 15
M/U BHA - Lay down 4 3/4" adj Motor & lead collar-
Pick up 6" Sting stablizer & 4 3/4" Anadrill XP
motor adjusted to 3/4BH with 5 3/4" stablizer sleeve -
Attempt to program ADN logging tool, Tool broken,
could not program - lay down ADN tool
BHA no. 15 made up
Pick up MWD w/GR & Resistivity only - surface
test MWD ok
R.I.H. to 9056.0 ft
TIH
At 7in casing shoe
Serviced Draw works
Fill pipe & service rig
Equipment work completed
R.I.H. to 14341.0 ft
Continue TIH, Tight at 16276
R.I.H. to 14341.0 ft
Continue TIH at 14341' at 0600 hrs - 25 stands off
bottom
BHA run no. 15 (cont...)
R.I.H. to 16276.0 ft (cont...)
Continue TIH at 14341' at 0600 hrs - 25 stands off
bottom
Began precautionary measures
Reamed to 16676.0 ft
Lay down 13 its drill pipe - Ream 16276 to bottom
at 16676, first time stablizer in hole section, no
problem reaming, - Lost 120 bbls of mud to formation
while ream until mud thin down
On bottom
Drilled to 17281.0 ft
Drill 17760 to 17837', Art 5.5 hrs, Ast 0 hrs,
Average Rop 14 ft/hr, Rop down to 5 fi/hr
Drilled to 17281.0 ft
Drill 16676 to '"~'° I~, ~.o at ~,,,,,,,~'~'~' ~--- Art~_,.'"
L~L ;~,
Facility West Beach
Date/Time
10:00-06:00
2 hr
16 Dec 97 06:00-06:00
06:00-06:00
17 Dec 97 06:00-22:30
06:00-11:30
11:30
11:30-13:30
6-1/2 hr
Progress Report
Well WB-05A
Rig POOL 6
Page
Date
35
11 August 99
21:00
21:00-22:30
14:30
14:30-21:00
13:30
13:30-14:30
22:30
22:30-06:00
22:30-01:30
18 Dec 97 01:30
01 '30-05:00
05:00
05:00-06:00
05:00-06:00
06:00-06:00
06:00-07:00
07:00
07:00-09:00
7-1/2 hr
3 hr
3-1/2 hr
1 hr
1 hr
24 hr
1 hr
2 hr
Duration Activity Ast 0 hrs, Average Rop 44 fi/hr, Slight drop in
20 hr Drilled to 17281.0 ft
Drill 17281 to 17760' at 0600 hrs, Art 19.5 hrs,
Ast 0 hrs, Average Rop 24.5 ft/hr - bit slowed to 10
ft/hr at 17530', drill ahead looking for shale on
resistivity log - increase mud wt. 10.3 to 10.5 ppg
24 hr BHA run no. 15 (cont...)
24 hr Drilled to 17760.0 ft (cont...)
Drill 17281 to 17760' at 0600 hrs, Art 19.5 hrs,
Asr 0 hrs, Average Rop 24.5 ft/hr - bit slowed to 10
ft/hr at 17530', drill ahead looking for shale on
resistivity log - increase mud wt. 10.3 to 10.5 ppg
16-1/2 hr BHA run no. 15 (cont...)
5-1/2 hr Drilled to 17837.0 ft (cont...)
Drill 17281 to 17760' at 0600 hrs, Art 19.5 hrs,
Ast 0 hrs, Average Rop 24.5 ft/hr - bit slowed to 10
fqhr at 17530', drill ahead looking for shale on
resistivity log - increase mud wt. 10.3 to 10.5 ppg
ROP dropped from 30.0 ft/hr to 5.0 ft/hr - Bit quit
Circulated at 17837.0 ft
Circulate around high vis sweep - monitor well-
pump slug
Obtained clean returns - 100.00 % hole volume
1 hr Laid down 1185.0 ft of 4in OD drill pipe
Pooh lay down 39 jts 4" drill for MAD pass on way
in hole
39 joints laid out
Pulled out of hole to 202.0 ft
Continue Pooh - no problem with hole
At BHA
1-1/2 hr Pulled BHA
Down load MWD- Lay down motor, Bit worn out
BHA Stood back
BHA run no. 16
Made up BHA no. 16
Pick up 4 3/4" Anadrill Motor set BH on 0 deg.,
pick up Anadrill ADN tool, program tool & load
source, Function test ok - Data will be in
recorded mode only on ADN
BHA no. 16 made up
R.I.H. to 8942.0 ft
TIH, fill pipe every 4000 ft.
Stopped ' To service drilling equipment
Serviced Block line
Slip & cut drill line 142'
Serviced Block line
Finish cutting drill line at casing shoe & service
rig
BHA run no. 16 (cont...)
Serviced Block line (cont...)
Finish cutting drill line at casing shoe & service
rig
Line slipped and cut
R.I.H. to 16571.0 ft
Continue TIH to 16571' - Prepare to MAD pass by
.
II.,alIt t~:J. tl~Glll, scctioi~ to klduttUlll ..... £~--tUt _t-kI~.I. NA 1~%1 Iog
Facility West Beach
Date/Time
09:00
09:00-12:00
12:00
12:00-13:00
13:00
13:00-00:00
19 Dec 97 00:00
00:00-06:00
00:00-06:00
06:00-09:00
06:00-07:30
07:30
07:30-09:00
09:00
09:00-06:00
09:00-10:00
10:00
10:00-15:30
15:30
15:30-20:00
20:00
20:00-04:30
20 Dec 97 04:30
04:30-06:00
Progress Report
Well WB-05A Page 36
Rig POOL6 Date 11 August 99
Duration
Activity
3 hr
1 hr
llhr
6 hr
6 hr
3 hr
1-1/2 hr
1-1/2 hr
21hr
1 hr
5-1/2 hr
4-1/2 hr
8-1/2 hr
1-1/2 hr
At Top of new hole section ' 16571.0 ft
Logged hole with LWD: Formation evaluation (FE) from 16571.0 ft to
16792.0 ft
Ream 16571 to 16792' - hole started packing off in
HRZ - no problem until 16792'
Began precautionary measures
Circulated at 16792.0 ft
Circulate -Pump high vis sweep
Hole swept with slug - 100.00 % hole volume
Logged hole with LWD: Formation evaluation (FE) from 16792.0 ft to
16928.0 ft
Attempt to Ream down logging with ADN tool - Hole
packing off, work bit to bottom of HRZ - Developed
ledge at 16915' - Could not get drill string past
ledge with BHA in hole - Hole condition
Deteriorating, excess amount of fine silt over shakers
Pressure changed from 3000.0 psi to 3500.0 psi in 9.00 hr - String blc
Torque increased 16000 ft/# to 19000 ft/#
Pulled out of hole to 5000.0 ft
Finish pooh to BHA
Pulled out of hole to 5000.0 fl
Monitor well - Pump slug - set back kelly - Pooh to
Lay down ADN tool - Change BHA to 1.0 deg BH motor,
pick up MWD w/gr & resistivity only - attempt to
TD well & run liner as soon as possible
BHA run no. 16 (cont...)
Pulled out of hole to 192.0 ft (cont...)
Monitor well - Pump slug - set back kelly - Pooh to
Lay down ADN tool - Change BHA to 1.0 deg BH motor,
pick up MWD w/gr & resistivity only - attempt to
TD well & run liner as soon as possible
At BHA
Pulled BHA
remove source - lay down ADN tool
BHA Stood back
BHA run no. 17
Made up BHA no. 17
Adjust motor to ldeg BH, pick up flex collar,
change bit
BHA no. 17 made up
R.I.H. to 16915.0 fl
TIH, fill pipe every 4000' - tag ledge at 16915'
Observed 40.00 klb resistance
Reamed to 16962.0 fl
Rean & work out ledge 16915 to 16962' - Hole
packing off, excess amount of cuttings over shaker-
increase mud wt. 10.5 to 10.8 ppg
No further resistance
Reamed to 17837.0 fl
Continue reaming to bottom at 17837' - hole not
packing off, excess cuttings still coming over shaker
On bottom
Drilled to 17869.0 fl
l. Jllll I I Od / LU I / ou~ ~tt ~JU~JU 1113 - I .Z...J 1113,
:ked
Progress Report
Facility West Beach
Well WB-05A Page 37
Rig POOL6 Date 11 August 99
Date/Time
04:30-06:00
06:00-06:00
06:00-18:00
18:00
18:00-00:00
21 Dec 97 00:00
00:00-02:00
02:00
02:00-06:00
02:00-06:00
06:00-06:00
06:00-06:15
06:15
06:15-10:30
10:30
10:30-11:00
11:00
11:00-13:30
Duration
1-1/2 hr
24 hr
12 hr
6 hr
2 hr
4 hr
4 hr
24hr
1/4 hr
4-1/4 hr
1/2 hr
2-1/2 hr
Activity Ast 0 hrs, Average Rop 25 ft/hr - lost 50 bbls of mud
Drilled to 17869.0 ft
Drill 17869 to TD @ 18033' - Art 11.0 hrs, Ast 0
hrs, Average Rop 15 ft/hr - mud lost to formation
60 bbls hr average, lost total 840 bbls to
formation while drilling - did not add LCM due to
production zone-drill with reduced flow rate to
save mud
BHA run no. 17 (cont...)
Drilled to 18033.0 ft (cont...)
Drill 17869 to TD @ 18033' - Art 11.0 hrs, Ast 0
hrs, Average Rop 15 ft/hr - mud lost to formation
60 bbls hr average, lost total 840 bbls to
formation while drilling - did not add LCM due to
production zone-drill with reduced flow rate to
save mud
Reached planned end of run - Section / well T.D.
Drilling with 246 gpm, normally at 285 to 300 gpm
Circulated at 18033.0 ft
Circulate low / high vis sweeps (two of each) to
clean hole, excess cuttings still coming over shaker
- Spot lub-tex pill in 6" open hole 18033 to 16238'
Obtained req. fluid properties - 100.00 %, hole vol.
Pulled out of hole to 15186.0 ft
Pooh 30 stands to top of 6" hole section - no
problem pooh, max drag 25K
At top of check trip interval
R.I.H. to 17016.0 ft
Continue working hole until clean - sand running in
hole
R.I.H. to 17016.0 ft
TIH, tag bridge at 17016' - could not get through,
PFU kelly, attempt to wash thru, attempt to rotate
thru, can not rotate - set back kelly, lay down 4
jr. - Ream 16866 to 16956' at 0600 hrs - ream until
hole allows kelly to move up & down with out circ.
BHA run no. 17 (cont...)
R.I.H. to 16956.0 ft (cont...)
TIH, tag bridge at 17016' - could not get through,
P/U kelly, attempt to wash thru, attempt to rotate
thru, can not rotate - set back kelly, lay down 4
jt. - Ream 16866 to 16956' at 0600 hrs - ream until
hole allows kelly to move up & down with out circ.
Began precautionary measures
Reamed to 16956.0 ft
Continue washing & ream hole 16891 to 16986'
-excessive ammout of sand over shaker, sand running into
hole from unconsolidated sand formation - work hole
until clean
No further resistance
R.I.H. to 17922.0 ft
tight hole at 17922'
Began precautionary measures
Reamed to 18033.0 ft
wash & ream 17922 to bottom at 18033' - pump low
vis swccp
Facility
Date/Time
22 Dec 97
23 Dec 97
West Beach
13:30
13:30-16:00
16:00
16:00-17:00
17:00
17:00-17:30
17:30
17:30-22:00
22:00
22:00-06:00
22:00-06:00
06:00-11:30
06:00-10:00
10:00
10:00-11:30
11:30
11:30-06:00
11:30-12:30
12:30
12:30-13:00
13:00
13:00-00:30
00:30
00:30-03:00
Progress Report
Well WB-05A Page 38
Rig POOL 6 Date 11 August 99
Duration
Activity
2-1/2 hr
1 hr
1/2 hr
4-1/2 hr
8 hr
8 hr
5-1/2 hr
4 hr
1-1/2 hr
18-1/2 hr
1 hr
1/2 hr
11-1/2 hr
2-1/2 hr
On bottom
Circulated at 18033.0 ft
Circulate & condition mud, pump around low/high
vis sweep - excess sand over shakers
Obtained req. fluid properties - 100.00 %, hole vol.
Pulled out of hole to 16577.0 ft
Short trip 15 stands to 16577' - no problem, max
20K over pull
At top of check trip interval
R.I.H. to 18033.0 ft
No problem RIH
On bottom
Circulated at 18033.0 ft
Circulate & condition mud - pump low/high vis sweep
around, - Spot 50 bbls of 11.2 ppg mud with lub-Tex
& Drill-n-Slide in 6" hole section - attempt to
stop sand from running
Obtained req. fluid properties - 100.00 %, hole vol.
Pulled out of hole to 5000.0 ft
Continue Pooh - lay down 180 jts drill pipe
Pulled out of hole to 5000.0 ft
Pooh for 3 1/2" liner - pull 30 stands, drop 2 1/2"
rabbit - stand back 100 stands & strap for liner
job - will lay down remainder of drill pipe & BHA for
room on floor to ensure safe working area while
running liner
BHA run no. 17 (cont...)
Pulled out of hole to 192.0 ft (cont...)
Pooh for 3 1/2" liner - pull 30 stands, drop 2 1/2"
rabbit - stand back 100 stands & strap for liner
job - will lay down remainder of drill pipe & BHA for
room on floor to ensure safe working area while
running liner
At BHA
Pulled BHA
Lay down BHA - clear floor
BHA Laid out
Run Liner, 3-1/2in O.D.
Rigged up Tubing handling equipment
Equipment work completed
Held safety meeting
Safety & operation meeting with crew on running
31/2" liner
Completed operations
Ran Liner to 8986.0 ft (3-1/2in OD)
Pick up 286jts 3 1/2" 9.2/9.3 # L-80 liner - 76
jts NSCT on bottom w/60 3 1/2 x 5 5/8" straight
bland centrizers - 210 jts 3 1/2" 9.3# EUE - Make
up Baker 7 x 5" Flex liner hanger
Stopped: To circulate
Circulated at 9000.0 ft
Circulate liner & annular volume - slip & cut drill
line, Service rig - Make up Cement head, hange in
derrick ~:-~'
- ,..,~.u~,~L~ at 3 1/2 .... ~,l .v,, I000 psi
Facility
Date/Time
24 Dec 97
West Beach
03:00
03:00-06:00
03:00-06:00
06:00-13:00
06:00-09:00
09:00
09:00-13:00
13:00
13:00-20:00
13:00-15:00
15:00
15:00-17:30
17:30
17:30-20:00
20:00
20:00-22:30
20:00-22:30
22:30
22:30-06:00
22:30-23:30
23:30
23:30-06:00
06:00-08:00
06:00-07:30
07:30
07:30-08:00
08:00
08:00-06:00
08:00-11:00
Progress Report
Well WB-05A Page 39
Rig POOL6 Date 11 August 99
Duration
Activity
3 hr
3 hr
7 hr
3 hr
4 hr
7 hr
2 hr
2-1/2 hr
2-1/2 hr
2-1/2 hr
2-1/2 hr
7-1/2 hr
1 hr
6-1/2 hr
2 hr
1-1/2 hr
1/2 hr
22 hr
3 hr
Obtained req. fluid properties - 100.00 %, hole vol.
Ran Liner on landing string to 13200.0 ft
Continue RIH with liner on 4" drill pipe - Tag
bridge at 16960'
Ran Liner on landing string to 13200.0 ft
TIH with liner on 4" 14# FH drill pipe - fill pipe
every 15 stands
Run Liner, 3-1/2in O.D. (cont...)
Ran Liner on landing string to 16960.0 fi (cont...)
TIH with liner on 4" 144 FH drill pipe - fill pipe
every 15 stands
Observed 40000.00 klb resistance
Circulated at 16960.0 ft
Circulate attempt to wash down liner - can not get
passed 16960' - appears to be hitting ledge, no
increase in pump pressure when stacked out on bottom,
hole not sticky, just can not go down
Began precautionary measures
Pull Liner, 3-1/2in O.D.
Pulled Liner on retrieval string to 15400.0 ft
Pooh with 31/2" liner - pull 15 stands - hole fill
short - gain 10 bbls
Began precautionary measures
Circulated at 15400.0 ft
Circulate & monitor well - air in mud from running
liner, did not have complete circultion before
starting out of hole
Obtained req. fluid properties - 100.00 %, hole vol.
Pulled Liner on retrieval string to 8986.0 fi
Continue Pooh with liner - no problem
At 7in casing shoe
Derrick management
Racked back drill pipe
Move drill pipe to off drill side of derrick ~ 30
stands
30 joints picked up
Pull Liner, 3-1/2in O.D.
Rigged up Tubing handling equipment
Equipment work completed
Pulled Liner in stands to 2000.0 ft
Lay down Baker liner hanger - no damage - pooh
stand back 3 1/2" EUE tubing in derrick, change seal
rings as pooh
Pull Liner, 3-1/2in O.D. (cont...)
Pulled Liner in stands to 0.0 ft (cont...)
Lay down Baker liner hanger - no damage - pooh
stand back 3 1/2" EUE tubing in derrick, change seal
rings as pooh
Shoe track assembly laid out
Rigged down Casing handling equipment
Equipment work completed
BHA run no. 18
Made up BHA no. 18
Load ^ ~,,,T .A_, oT x ,~ ·
Facility West Beach
Datefrime
11:00
11:00-18:00
18:00
18:00-21:00
21:00
21:00-22:30
22:30
22:30-02:00
25 Dec 97 02:00
02:00-05:00
05:00
05:00-06:00
06:00-06:00
06:00-06:30
06:30
06:30-12:00
12:00
12:00-15:30
15:30
15:30-23:00
23:00
23:00-06:00
23:00-06:00
Progress Report
Well WB-05A Page 40
Rig POOL 6 Date 11 August 99
Duration
Activity
7 hr
3 hr
1-1/2 hr
3-1/2 hr
3 hr
1 hr
24hr
1/2 hr
5-1/2 hr
3-1/2 hr
7-1/2 hr
7 hr
7 hr
BHA no. 18 made up
Singled in drill pipe to 6000.0 ft
180 joints picked up
R.I.H. to 9122.0 ft
At 7in casing shoe
Circulated at 9122.0 ft
Hole displaced with Water based mud - 100.00 % displaced
Mud coming back thick and with variable mud
weights .....circulated until properly conditioned mud
returned.
R.I.H. to 15330.0 ft
At Top of new hole section · 15330.0 ft
RIH to bottom of 8-1/2" hole section to allow this
section of mud in hole to be moved and treated to
minimize ECD losses downhole when working at lower
hole section.
Circulated at 15330.0 ft
Obtained req. fluid properties - 150.00 %, hole vol.
Circulated out variable mud weights and conditions
until mud returned in good shape. No static losses
but having some ECD losses, with subsequent hole
breathing when pumps turned off
R.I.H. to 16500.0 ft
RIH slowly to get to bridge where liner stopped.
hole seems in good shape to this particular point.
BHA run no. 18 (cont...)
R.I.H. to 16775.0 ft (cont...)
RIH slowly to get to bridge where liner stopped.
hole seems in good shape to this particular point.
Observed 40000.00 klb resistance
Reamed to 16775.0 ft
Reamed to 16813, packing off and losing returns.
Completed precautionary measures
Reamed to 16846.0 ft
Still tight, but hole quit packing off. total of
486 barrels lost to formation up until returns were
restored completely. About 1" of sand across
shakers consistently.
Began precautionary measures
Reamed to 16880.0 ft
Began 4ppb Barafiber additions to stabilize hole.
Began making better progress as sand volumves
remained steady, but less packing off. No losses
encountered now
Completed precautionary measures
Reamed to 16909.0 ft
Hole packed off at 16880 and took a long time to
get it cleaned up and be able to rotate ahead past
tight spot @ 16870-16885. Reamed past it .... working
spot at 16909 at report time. unable to get past
it yet while both circulating and rotating.
Reamed to 16909.0 ft
Worked spot @ 16909. Weighted up mud to 10.9. Hole
L.*UIIUI LIUII3 IIU VY bIIL~I%.C.I auu ¥ ~ al-II. JCl& ~,ll~ lCLL[g.,,
Facility
Date/Time
26 Dec 97
27 Dec 97
28 Dec 97
West Beach
Progress Report
Well WB-05A Page 41
Rig POOL 6 Date 11 August 99
06:00-06:00
06:00-00:00
00:00
00:00-00:30
00:30
00:30-06:00
06:00-09:30
06:00-08:30
08:30
08:30-09:30
09:30
09:30-06:00
09:30-12:00
12:00
12:00-14:30
14:30
14:30-15:30
15:30
15:30-16:30
16:30
16:30-19:30
19:30
19:30
19:30-21:00
21:00
21:00-21:30
21:30
21:30-00:30
00:30
00:30-01:00
01:00
01:00-02:00
02:00
02:00-06:00
Duration
24 hr
18hr
1/2 hr
5-1/2 hr
3-1/2 hr
2-1/2 hr
1 hr
20-1/2 hr
2-1/2 hr
2-1/2 hr
1 hr
1 hr
3 hr
1-1/2 hr
1/2 hr
3 hr
1/2 hr
1 hr
4 hr
Activity negligible (35 bbl) mud losses last 24 hrs. During last
BHA run no. 18 (cont...)
Reamed to 16916.0 ft (cont...)
Worked spot @ 16909. Weighted up mud to 10.9. Hole
conditions now slicker above apparent ledge,
negligible (35 bbl) mud losses last 24 hrs. During last
part of working, seemed to be able to get past
ledge, but couldn't pump or turn below tight spot.
Completed precautionary measures
finally able to clear kelly bushings and go back
down without turning, but could not get below 16916.
Possible hole opener problem; will POOH and lay out
ADN tool and replace H/O with bit.
Circulated at 16919.0 ft
Pumped slug and set back kelly.
Stopped: To pick up/lay out tubulars
-Pulled out of hole to 8200.0 ft
POOH well .... no unusual drag or hole fill.
BHA run no. 18 (cont...)
Pulled out of hole to 175.0 ft (cont...)
POOH well .... no unusual drag or hole fill.
At BHA
Pulled BHA
BHA Stood back
Dumped and L/D ADN tool, Hole Opener bearings all
failed.
BHA run no. 19
Made up BHA no. 19
P/U new bit and inserted string stabilizer at same
location as ADN tool was located.
BHA no. 19 made up
R.I.H. to 9100.0 ft
Loising returns while first running back into hole.
Slowed tripping speeds to where full mud stream
returning
At 7in casing shoe
Serviced Block line
Line slipped and cut
Circulated at 9100.0 ft
Obtained bottoms up (100% annulus volume)
R.I.H. to 13539.0 ft
Observed 20000.00 klb resistance
Hit bridge
Began precautionary measures
Circulated at 13539.0 ft
Broke circulation
R.I.H. to 15332.0 ft
Began precautionary measures
Circulated at 15332.0 ft
Obtained clean returns - 180.00 % hole volume
R.I.H. to 16809.0 ft
Began precautionary measures '...
Reamed to 16912,0 ft
Completed precautionary measures
Reamed to 16912.0 ft .... : ....
Facility
ii
West Beach
Progress Report
Well WB-05A Page 42
Rig POOL 6 Date 11 August 99
Date/Time
29 Dec 97
06:00-06:00
06:00-10:00
10:00
10:00-12:00
12:00
12:00-06:00
12:00-06:00
06:00-04:00
06:00-08:00
08:00
08:00-10:00
10:00
10:00-11:00
11:00
11:00-12:00
12:00
12:00-15:30
15:30
Duration
24 hr
4 hr
2 hr
18hr
18 hr
22 hr
2 hr
2 hr
1 hr
1 hr
3-1/2 hr
Activity connection, can get past spot while rotating, but
BHA run no. 19 (cont...)
Reamed to 16974.0 ft (cont...)
working ledge @ 16912. Can not get past it to make
connection, can get past spot while rotating, but
not while sliding string down w/o rotation.
working to grind edge of ledge off so we can get
past it
w/o rotation while lowering drill string.
Got stuck whilst pipe moving
Jarred stuck pipe at 16950.0 ft
String became completely packed off and stuck.
Worked pipe. Able to get small circ rate (1000
psi @
8 spm). Fired jars-up hitting well. Had to
shut down pump to get down hit. circ improved
over
jarring to 1200 psi @ 30 spm. jarred free upward
Pipe came free
Worked upwards, could not get back down. had to
lay down single to begin rotating and enable
downward movement. Began re-reaming that single
down
very slowly, lots of sand and very fine shale over
shakers. Good returns while jarring and circ.
Reamed to 16980.0 ft
slowed to <2 fph; could not tell if stab was
hanging up on ledge or if well was sidetracked on dull
bit.
Reamed to 16980.0 ft
Able to make another connection, reaming very
slowly, picking up and cleaning up when hole packs off.
Stability of hole improving, but progress slow
BHA run no. 19 (cont...)
Reamed to 16990.0 ft (cont...)
Able to make another connection, reaming very
slowly, picking up and cleaning up when hole packs off.
Stability of hole improving, but progress slow
ROP dropped from 40.0 fi/hr to 2.0 fi/hr - String hung up
Circulated at 16990.0 ft
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 15990.0 ft
Stopped: Incorrect trip volume
Incorrect hole fill; second increment confirmed.
Probably hole breathing (history of same in well),
but took precautionary trip back to end of run
R.I.H. to 16943.0 ft
Observed 20000.00 klb resistance
Reamed to 16949.0 ft
Very slow progress; packing off. Lots of solids
at surface, could not make connection due to
hanging up on ledge and inability to rotate at that
point. Began trip again after solids volume across
shakers stabilized.
Completed precautionary measures
Facility
Date/Time
30 Dec 97
31 Dec 97
Progress Report
West Beach
Well WB-05A Page 43
Rig POOL6 Date 11 August 99
15:30-17:00
17:00
17:00-19:30
19:30
19:30-02:00
02:00
02:00-03:00
03:00
03:00-04:00
04:00
04:00-06:00
04:00-05:00
05:00
05:00-06:00
06:00-10:00
06:00- I0:00
10:00
10:00-06:00
10:00-16:30
16:30
16:30-21:30
21:30
21:30
21:30-23:00
23:00
23:00-00:00
00:00
00:00-02:30
02:30
02:30-04:00
04:00
04:00-06:00
06:00-06:00
06:00-06:30
Duration
1-1/2 hr
2-1/2 hr
6-1/2 hr
1 hr
1 hr
2 hr
1 hr
1 hr
4 hr
4 hr
20 hr
6-1/2 hr
5 hr
1-1/2 hr
1 hr
2-1/2 hr
1-1/2 hr
2 hr
24hr
1/2 hr
Activity
Pulled out of hole to 15400.0 ft
Normal drag and hole fill.
At Kick off depth: 15400.0 ft
Circulated at 15400.0 ft
Obtained bottoms up (100% annulus volume)
Circ. with higher rates in attempt to clean up
8-1/2" hole section with higher volumes. Lots of
solids returned, but experienced some losses doing so.
Pulled out of hole to 175.0 ft
At BHA
Pulled BHA
BHA Stood back
Serviced Drillfloor / Derrick
Equipment work completed
Test well control equipment
Rigged up High pressure lines
Equipment work completed
Tested BOP stack
Test witness waived by AOGCC rep Larry Wade
Test well control equipment (cont...)
Tested BOP stack (cont...)
Test witness waived by AOGCC rep Larry Wade
Pressure test completed successfully - 5000.000 psi
BHA run no. 20
Made up BHA no. 20
discovered bent stabilizer from previous run...
middle stab (aobve lead collar)
BHA no. 20 made up
R.I.H. to 9132.0 ft
had to stage in hole and circ every 3000 feet due
to sand and formations solids plugging screens while
RIH.
At 7in casing shoe
Began precautionary measures
Circulated at 9132.0 ft
Circ until screens cleaned up
Obtained bottoms up (100% annulus volume)
R.I.H. to 12142.0 ft
Began precautionary measures
Circulated at 12142.0 ft
Obtained clean returns - 125.00 % hole volume
R.I.H. to 15248.0 ft
At Kick off depth: 15248.0 ft
Circulated at 15248.0 ft
Staging operation successful; losses minimized and
formations solids cleaned from system while RIH.
Lots of LCM coming over shakers right now... 20 min
from bottoms up.
BHA run no. 20 (cont...)
Circulated at 15248.0 ft (cont...)
Staging operation successful; losses minimized and
formations solids cleaned from system while RIH.
Lots of LCM coming over shakers right now... 20 min
from bottoms up.
Facility
Date/Time
01 Jan 98
Progress Report
West Beach
Well WB-05A Page 44
Rig POOL6 Date 11 August 99
06:30
06:30-08:30
08:30
08:30-17:00
17:00
17:00
17:00-17:30
17:30
17:30-21:30
21:30
21:30-00:30
00:30
00:30-04:00
04:00
04:00-06:00
06:00-06:00
06:00-07:00
07:00
07:00-13:00
13:00
Duration
2 hr
8-1/2 hr
1/2 hr
4 hr
3 hr
3-1/2 hr
2 hr
24 hr
1 hr
6 hr
Activity
Obtained bottoms up (100% annulus volume)
R.I.H. to 16880.0 ft
Took Anadrill benchmark survey @ 16663
Began precautionary measures
Reamed to 17012.0 ft
Tagged up on blockage @ 16911. could not ream past
it with rotation. Original tool face orientation on
low side.., stopped in same spot and couldn't make
any progress. Changed tools to high side and was
able to see progress with small motor diff.
Stopped · To correlate depth
Able to work past ledges @ 16910 and 16970 using
repeated nibbling runs for motor. Ran into difficult
spot at 16988 for packing off. surveys at 17012
through previous areas indicated well sidetracked;
azimuth matched, but angle was 0.85 deg too high.
Began precautionary measures
Laid down 93.0 ft of 4in OD drill pipe
Lddp to get above previous ledging problem and try
again.
3 joints laid out
Reamed to 17012.0 ft
Oriented tool face to low side and attempted to
find original wellbore, could not work into anything
but new wellbore with repeated attempts and
orientations.
Completed precautionary measures
Circulated at 16912.0 ft
up=230, dn-95, rot = 140. Pump 2950@ 76 spm.
Losing significant volumes of mud during circulation,
but hole was being cleaned of lots of formation not
previously seen.
Obtained bottoms up (100% annulus volume)
Pulled out of hole to 12000.0 ft
Monitored well. No flow. Hole fill normal and no
unusual drag while POOH.
At top of check trip interval
R.I.H. to 15000.0 ft
Hit obstruction @ 13500 approx.., able to work past
with no problems. Went up again and spot wasn't
there when re-lowering.
BHA run no. 20 (cont...)
R.I.H. to 16916.0 ft (cont...)
Hit obstruction @ 13500 approx.., able to work past
with no problems. Went up again and spot wasn't
there when re-lowering.
Began precautionary measures
Reamed to 16983.0 ft
Washed to 16980, reaming from there.., unable to
make progress. Lots of packing off, downhole losses
required building of (total for the day) 950 bbl's
mud volume.
Stopped ' To circulate
Unable to continue circulation; downhole losses
..~ ut,ay ~ at re, ual plant.
Facility
Date/Time
02 Jan 98
Progress Report
West Beach
Well WB-05A Page 45
Rig POOL 6 Date 11 August 99
Duration
Activity
13:00-15:30
15:30
15:30-21:00
21:00
21:00-02:00
02:00
02:00-06:00
06:00
06:00-06:00
06:00-09:00
09:00
09:00-10:00
10:00
10:00-12:00
12:00
12:00-13:00
13:00
13:00-14:00
14:00
14:00-17:00
17:00
17:00-18:00
18:00
18:00-23:00
2-1/2 hr
5-1/2 hr
5 hr
4 hr
24 hr
3 hr
1 hr
2 hr
1 hr
1 hr
3 hr
1 hr
5 hr
Rest hole at 16983.0 ft
Resumed operations
Pulled out of hole to 12000.0 ft
POOH slowly, flu normal, no unusual drag.
Monitored well before POOH. Well flowback normal.
At top of check trip interval
Rest hole at 12000.0 ft
Above any potential trouble spots; building mud
volume to counter downhole losses. Truckloads of mud
from plant arrived 0200.
Resumed operations
All 4-1/2" liner equipment arrived on location,
including float equipment, liner hanger,
turbulators. Tallying and rabbiting liner in pipe
shed.
R.I.H. to 16900.0 ft
Just approaching bottom @ report time. RIH slowly
to avoid mud losses, good returns generally. Hole
now standing full when static. Will be attempting
to reach 17012, but will stop short if unable to
progress past 16990 (approx) or if losses
increase.
Began precautionary measures
BHA run no. 20 (cont...)
Reamed to 17000.0 ft
Reaming down going well; losses exceeding 150
bbl/hr, delays in mud plant forcing rig below safe
circ. volumes.
Began precautionary measures
Rest hole at 17000.0 ft
Work pipe while building volume in mud pits.
Resumed operations
Pulled out of hole to 15200.0 ft
POOH to 8-1/2" hole to build volume and wipe hole.
At top of check trip interval
Rest hole at 15200.0 ft
Work pipe and condition mud; received word that
mud plant deliveries on the way.
Resumed operations
R.I.H. to 16785.0 ft
Began precautionary measures
Reamed to 17007.0 ft
Precautionary washing at 16785-16890. Had to begin
reaming there, no fill in particular, just ledges.
Still encountering >150 bbl/hr losses, filled 6"
hole with new mud and 5% Lube-Tex.
Completed precautionary measures
Rest hole at 17007.0 ft
Set back kelly and monitored well, well flowing
back slightly as normal breathing has been seen
throughout job.
Resumed operations
Laid down 2500.0 ft of 4in OD drill pipe
PO011 ,~D
IIUWIIi~ 311~iitl~/, I/U.t tO. MJi~ lilt.
Facility
Date/Time
03 Jan 98
West Beach
23:00
23:00-00:00
00:00
00:00-03:00
03:00
03:00-06:00
03:00-06:00
06:00-06:00
06:00-10:00
10:00
10:00-14:00
14:00
14:00-17:00
17:00
17:00-19:00
19:00
19:00-20:00
20:00
20:00-22:30
22:30
22:30-23:30
Progress Report
Well WB-05A Page 46
Rig POOL6 Date 11 August 99
Duration
1 hr
3 hr
3 hr
3 hr
24 hr
4 hr
4 hr
3 hr
2 hr
1 hr
2-1/2 hr
lhr
Activity Began swabbing and could not stop swabbing with
Began precautionary measures
Flow check
Well flowing continually, slightly stronger than
initial flow. Closed in well to check wellbore
pressures. Zero pressure buildup on drillpipe or
annulus. Well flowing again when opened back up, but
stripping back to bottom not deemed necessary.
Began precautionary measures
Singled in drill pipe to 16793.0 ft
75 joints picked up
Circulated at 16793.0 ft
Circulating at very slow pump rates to get
higher-viscosity mud moving while minimizing losses. 25
spm initial rates, negligible losses, although it's
hard to tell right now with watering back
viscosities. Maintaining mud properties the same.
Circulated at 16793.0 ft
Circ with very slow circ rates 20 spm with
negligible losses. Slowly worked up to 35 spm with no
apparent losses (thinning down mud simultaneously, so
it's difficult to say for sure) good returns,
though. Increased rate to 40 spm, encountered losses
BHA run no. 20 (cont...)
Circulated at 16793.0 ft (cont...)
Circ with very slow circ rates 20 spm with
negligible losses. Slowly worked up to 35 spm with no
apparent losses (thinning down mud simultaneously, so
it's difficult to say for sure) good returns,
though. Increased rate to 40 spm, encountered losses
Began precautionary measures
Reamed to 16985.0 fl
Losses steady at 40 bph, slowed down pump rate to
30 spm. Washed to 16915, had to rotate to get below
that, but no fill encountered.
Completed precautionary measures
Circulated at 16985.0 ft
Returning FV 45-49, MW 10.9-11.0
Hole displaced with Water based mud - 100.00 % displaced
Displaced new mud with 5% Lube-Tex into drill
string and into all of 6" hole.
Pulled out of hole to 16076.0 ft
POOH ten stands, well flowing back, pulling.very
slowly to avoid swabbing.
Stopped: Incorrect trip volume
Flow check
Well gained 2.5 bbl's in an hour, but slowed to
almost no flow. Total gained since leaving bottom 37
bbl's.
Observed 2.500 bbl gain in annulus in 1.00 hr
Pulled out of hole to 14666.0 ft
POOH slowly, no swabbing, checking well for flow
again.
Began precautionary measures
Flow check
Facility
Date/Time
04 Jan 98
05 Jan 98
06 Jan 98
Progress Report
West Beach
Well WB-05A Page 47
Rig POOL6 Date 11 August 99
23:30
23:30-01:30
01:30
01:30-02:00
02:00
02:00-06:00
02:00-06:00
06:00-15:30
06:00-14:30
14:30
14:30-15:30
15:30
15:30-06:00
15:30-17:30
17:30
17:30-18:00
18:00
18:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00-06:00
06:00-07:00
07:00
07:00-08:00
08:00
08:00-09:30
09:30
09:30-13:30
13:30
13:30-06:00
13:30-06:00
06:00-11:00
06:00-11:00
Duration
2 hr
1/2 hr
4 hr
4 hr
9-1/2 hr
8-1/2 hr
1 hr
14-1/2 hr
2 hr
1/2 hr
11-1/2 hr
1/2 hr
1/2 hr
24 hr
1 hr
1 hr
1-1/2 hr
4 hr
16~1/2 hr
16-1/2 hr
5 hr
5 hr
Activity
Observed well static
Pulled out of hole to 12974.0 ft
Stopped · Incorrect trip volume
Flow check
Observed well static
Well static and holding steady, pumped slug
Pulled out of hole to 10000.0 ft
POOH LDDP
Pulled out of hole to 10000.0 ft
Stood back 99 stands, laid down 79 stands
BHA run no. 20 (cont...)
Pulled out of hole to 175.0 ft (cont...)
Stood back 99 stands, laid down 79 stands
At BHA
Pulled BHA
BHA Laid out
Run Liner, 4-1/2in O.D.
Rigged up Casing handling equipment
Work completed - Casing handling equipment in position
Held safety meeting
Completed operations
Ran Liner to 8000.0 ft (4-1/2in OD)
Hanger assembly installed
Circulated at 8000.0 ft
Circ volume of liner
Circulated at 8000.0 ft
Circulated volume of liner.
Run Liner, 4-1/2in O.D. (cont...)
Circulated at 8000.0 ft (cont...)
Circulated volume of liner.
Slow circulation rates completed
Ran Liner on landing string to 9155.0 ft
At 7in casing shoe
Circulated at 9155.0 ft
Obtained bottoms up (100% annulus volume)
Ran Liner in stands to 12179.0 ft
After last fill, some resistance when pulling pipe
out of slips. Got progressively stickier while
lowering string.
Got stuck whilst pipe stationary
Could not move pipe after making up a stand.
Worked stuck pipe at 12179.0 ft
Good circulation, working pipe @ 250 up and 70
down, keeping circ pressure below 800 psi while
bringing MW down in steps to 10.0, then to 9.7. 100 bbl's
10.0 SFT loaded in pits @ report time.
Worked stuck pipe at 12179.0 ft
Working range was 325 up, 50 down. Had apparent 6"
down movement when working at new parameters, but
could get no other movement. Pump rate 800 psi @ 48
spm, after trying to pull free, 36-42 spm @ same
pressure.
Run Liner, 4-1/2in O.D. (cont...)
Worked stuck pipe at 12179.0 ft (cont...)
¥¥ UIMII[ ldll[~, WI:ID JZ.,J U. JJ, JU [.tUWll. lldkl dlJ_[.Jdl~'llt U
Facility
Date/Time
07 Jan 98
Progress Report
West Beach
Well WB-05A Page 48
Rig POOL6 Date 11 August 99
11:00
11:00-06:00
11:00-13:00
13:00
13:00-18:00
18:00
18:00-20:30
20:30
20:30-06:00
20:30-06:00
06:00-10:00
06:00-07:30
07:30
07:30-09:30
09:30
09:30-10:00
10:00
10:00-06:00
10:00-16:30
16:30
16:30-18:30
18:30
18:30-19:00
19:00
19:00-19:30
19:30
Duration
19hr
2 hr
5 hr
2-1/2 hr
9-1/2 hr
9-1/2 hr
4 hr
1-1/2 hr
2 hr
1/2 hr
20 hr
6-1/2 hr
2 hr
1/2 hr
1/2 hr
Activity down movement when working at new parameters, but
Aborted attempts to work Liner free at 12179.0 ft
Stuck Liner 4-1/2in
Pumped Pseudo OBM spacers - volume 100.000 bbl
Spotted 100 bbl's SFT @ 10.0 @ 40 spm so that 40
bbl's remained inside string.
Required volume of spacer pumped
Worked stuck pipe at 12179.0 ft
Aborted attempts to work Liner free at 12179.0 ft
Pulled out of hole to 0.0 ft
Released running tool from liner hanger with
rt/hand rotation and POOH. L/D running tool and Lake
Charles head.
At BHA
Conducted electric cable operations
Continue RIH with 3 5/8" Chemical cutter - Cut
41/2" 12.6~ L-80 liner at 9034' Wireline measurements
Conducted electric cable operations
R/U SWS and RIH w/CCL, chemical cutter (Tool OD=
3-5/8") Was very slow at 6000' but is now going
down faster and looks as if tool will make it to
cutting depth. (@ 8000' @ report time)
Stuck 4-1/2in Liner (cont...)
Conducted electric cable operations (cont...)
R/U SWS and RIH w/CCL, chemical cutter (Tool OD=
3-5/8") Was very slow at 6000' but is now going
down faster and looks as if tool will make it to
cutting depth. (@ 8000' @ report time)
Run completed but Toolstring hung up at 9034.0 ft
Chemical cutter stuck after firing charge at 9034'
Worked toolstring at 9034.0 ft
Work wireline - can not pull free - pull out of
rope socket
Aborted attempts to work Chemical cutter free at 9034.0 ft
Conducted electric cable operations
Pooh rig down Schlumberger wireline
Completed run with Chemical cutter from 9034.0 ft to 9034.0 ft
BHA run no. 21
Made up BHA no. 21
Make up Fishing BHA: Dual spears w/bumper sub &
oil jars with 9 4 3/4" drill collars
BHA no. 21 made up
R.I.H. to 4141.0 ft
TIH with fishing assembly - Tag top of fish at 4141
drill pipe measurements
At Top offish: 4141.0 ft
Fished at 4141.0 ft
Latch fish - Pick up gain 35K on weight indicator,
fish free
Latched fish
Circulated at 4141.0 ft
Pump slug at 2 BPM - did not circulate bottoms up,
did not want to circulate chemical cutter fish out
of bottom of top fish if still stuck
Hole swept with slug - 25.00 % hole volume
Facility
Date/Time
08 Jan 98
09 Jan 98
Progress Report
West Beach
Well WB-05A Page 49
Rig POOL6 Date 11 August 99
19:30-21:30
21:30
21:30-23:00
23:00
23:00-06:00
06:00
06:00-02:30
06:00-09:00
09:00
09:00-14:00
14:00
14:00-15:30
15:30
15:30-20:30
20:30
20:30-21:00
21:00
21:00-01:00
01:00
01:00-02:30
02:30
02:30-06:00
02:30-03:30
03:30
03:30-06:00
03:30-06:00
06:00-08:00
Duration
2 hr
1-1/2 hr
7 hr
20-1/2 hr
3 hr
5 hr
1-1/2 hr
5 hr
1/2 hr
4 hr
1-1/2 hr
3-1/2 hr
1 hr
2-1/2 hr
2-1/2 hr
2 hr
Activity
Pulled out of hole to 311.0 fl
At BHA
Pulled BHA
Fish at surface - Release spears
BHA Stood back
Laid down fish
Pooh lay down Liner hanger & 119 jts 4 1/2" 12.6g
L-80 liner - lay down cut jr. 9.70' - Change
handling tools - Prepare to pick up overshot to fish stuck
liner - Chemical cutter tool string still in hole
Partial fish recovered
Top of fish @ 9034' WLM
BHA run no. 22
Made up BHA no. 22
Make up BHA #22, Fishing assembly #2 - Pick up 5
7/8" overshot dressed with 4 1/2" grapple
BHA no. 22 made up
R.I.H. to 9010.0 ft
TIH with overshot to 9010' - pick up kelly
At Top of fish: 9040.0 ft
Circulated at 9010.0 ft
Circulate hole clean - Spotting oil over shakers
Obtained clean returns - 100.00 % hole volume
Fished at 9040.0 ft
Tag & latch fish at 9040' - jar on stuck 4 1/2"
liner - jar at 100K over, work string to 375K - 210K
pull at top of fish, 100% yield of liner - no
success - Beat down with bumper sub, no movement -
attempt to rotate liner free, will not rotate - Stuck
Released fish
Liner stuck can not jar free - Circulated at 3.5
BPM 1000 psi until chemical cutter landed on landing
collar, Chemical cuttter plugged landing collar,
could not circulate thereafter - Release overshot
Circulated at 9010.0 ft
Break circulation - pump slug
Heavy slug spotted downhole
Pulled out of hole to 311.0 ft
At BHA
Pulled BHA
Lay down 4 3/4" BHA
BHA Laid out
Test well control equipment
Retrieved Wear bushing
Retrieve wear bushing, install test plug
Equipment work c°mpleted
Tested BOP stack
Finish testing Bop
Tested BOP stack
Test BOP: Test all rams, lines & valves to 250 low
& 5000 psi high, Test Hydrill to 250 & 3500 psi -
Testing kelly at report time - Witness of BOP test
waived by Chuck Sheeve of AOGCC
Test well control equipment (cont...)
Facility
Date/Time
10 Jan 98
West Beach
06:00-06:30
06:30
06:30-07:00
07:00
07:00-08:00
08:00
08:00-03:30
08:00-09:00
09:00
09:00-14:30
14:30
14:30-15:30
15:30
15:30-18:00
18:00
18:00-19:00
19:00
19:00-23:00
23:00
23:00-00:00
00:00
00:00-03:00
03:00
03:00-03:30
03:30
03:30-06:00
03:30-05:00
05:00
Progress Report
Well WB-05A Page 50
Rig POOL6 Date 11 August 99
Duration
1/2 hr
1/2 hr
1 hr
19-1/2 hr
1 hr
5-1/2 hr
1 hr
2-1/2 hr
1 hr
4 hr
1 hr
3 hr
1/2 hr
2-1/2 hr
1-1/2 hr
Activity
Tested BOP stack (cont...)
Test BOP: Test all rams, lines & valves to 250 low
& 5000 psi high, Test Hydrill to 250 & 3500 psi -
Testing kelly at report time - Witness of BOP test
waived by Chuck Sheeve of AOGCC
Pressure test completed successfully - 5000.000 psi
Installed Wear bushing
Eqpt. work completed, running tool retrieved
Serviced Draw works
Equipment work completed
BHA run no. 23
Made up BHA no. 23
Make up 3 5/8" overshot dressed with 1.660 grapple,
3 1/8" bumper sub & oil jars
BHA no. 23 made up
R.I.H. to 8960.0 ft
TIH with overshot for chemical cutter fish
Stopped ' To service drilling equipment
Serviced Block line
Slip & cut drill liner 100' - last cut on spool
Line slipped and cut
R.I.H. to 12079.0 ft
Work to get overshot into 4 1/2" liner stub -
Continue TIH, tag & latch fish - verify with pump
pressure
At Top of fish · 12079.0 ft
latched fish
Circulated at 12079.0 ft
Pressure up & open circulation sub at 2500 psi,
circulate & pump slug
Heavy slug spotted downhole
Pulled out of hole to 3200.0 ft
Lay down excess 4" drill pipe - pooh with fish
Stopped · To change handling equipment
Rigged up Drillstring handling equipment
Rig up GBR power tongs- making up & breaking out 2
7/8 Pac drill pipe with power tongs on tool jt. of
2 7/8" drill pipe - torque 3700 ft/#
Equipment work completed
Pulled out of hole to 25.0 ft
Continue Pooh with fish
Fish at surface
Laid down fish
Lay down fishing tools - Recovered Schlumberger 3
5/8" Chemical cutter tool string fish - Schlumberger
personnel on rig floor when fish at surface for
safety concerns
Complete fish recovered
BHA run no. 24
Made up BHA no. 24
Make up 3 3/4" mill on 3 3/8" Baker motor with
bumper sub & oil jars
BHA no. 24 made up
BHA to drill out landing collar, float collar &
_L,~
Facility
Date/Time
11 Jan 98
West Beach
05:00-06:00
05:00-06:00
06:00-06:00
06:00-13:00
13:00
13:00-14:30
14:30
14:30-16:00
16:00
16:00-22:00
22:00
22:00-01:30
01:30
01:30-02:00
02:00
02:00-05:30
05:30
05:30-06:00
05:30-06:00
06:00-06:30
06:00-06:30
06:30
06:30-11:00
06:30-11:00
11:00
11:00-16:30
Progress Report
Well WB-05A Page 51
Rig POOL6 Date 11 August 99
Duration
Activity
1 hr
1 hr
24 hr
7 hr
1-1/2 hr
1-1/2 hr
6 hr
3-1/2 hr
1/2 hr
3-1/2 hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
4-1/2 hr
4-1/2 hr
5-1/2 hr
R.I.H. to 1000.0 ft
TIH with 3 3/4" mill - Will pick up enough 2 7/8"
drill pipe to get to 16700' - top of 4 1/2" stuck
liner at 9040'
R.I.H. to 1000.0 ft
Continue TIH w/35 stands of 2 7/8" 10.4# S-135 Pac
drill pipe from derrick, Pick up 150 jts 2 7/8"
from pipe shed - TIH with 4" drill pipe from
derrick -tag liner top at 9040' - work mill into
top of liner - continue TIH - Tag Landing collar
at 12093'
BHA run no. 24 (cont...)
R.I.H. to 12093.0 ft (cont...)
Continue TIH w/35 stands of 2 7/8" 10.4# S-135 Pac
drill pipe from derrick, Pick up 150 jts 2 7/8"
from pipe shed - TIH with 4" drill pipe from
derrick -tag liner top at 9040' - work mill into
top of liner - continue TIH - Tag Landing collar
at 12093'
At Float collar: 12093.0 ft
Drilled installed equipment - Landing collar
Drill landing collar at 12093, Drill float collar
at 12135, drill shoe at 12176'
Completed operations
R.I.H. to 16681.0 ft
Continue TIH - tag fill at 16681'
Observed 10.00 klb resistance
Circulated at 16681.0 ft
Circulate & condition mud - balance mud wt. at 9.9
ppg - slight mud loss to fonnation- Did not
attempt to clean out fill - Circulate full
circulation- no gas - Monitor well - pump slug
Obtained req. fluid properties - 100.00 %, hole vol.
Pulled out of hole to 7833.0 fl
Pooh stand back 4" drill pipe
Stopped: To change handling equipment
Rigged up Drillstring handling equipment
Work completed - Drillstring handling equipment in position
Pulled out of hole to 35.0 ft
Continue Pooh stand back 2 7/8" drill pipe
At BHA
Pulled BHA
Finish laying down BHA - clear floor
Pulled BHA
Lay down jars & mud motor - clear floor
BHA run no. 24 (cont...)
Pulled BHA (cont...)
Lay down jars & mud motor - clear floor
BHA Laid out
2-7/8in. Cement stinger workstring run
Pulled Drillpipe in stands to 16640.0 ft
At Setting depth: 16640.0 ft
Cement: Abandonment plug
Facility
Date/Time
12 Jan 98
Progress Report
West Beach
Well WB-05A Page 52
Rig POOL6 Date 11 August 99
11:00-15:30
15:30
15:30-15:45
15:45
15:45-16:00
16:00
16:00-16:30
16:30
16:30-21:30
16:30-17:30
17:30
17:30-21:00
21:00
21:00-21'30
21:30
21:30-00:00
21:30-23:00
23:00
23:00-23:15
23:15
23:15-23:30
23:30
23:30-00:00
00:00
00:00-06:00
00:00-00:30
00:30
00:30-02:30
Duration
4-1/2 hr
1/4 hr
1/4 hr
1/2 hr
5 hr
1 hr
3-1/2 hr
1/2 hr
2-1/2 hr
1-1/2 hr
1/4 hr
1/4 hr
1/2 hr
6 hr
1/2 hr
2 hr
Activity
Circulated at 16640.0 ft
Circulate & condition mud, balance mud wt. at 9.9
ppg - thin mud - circulate at 4 bpm 3500 psi
Obtained req. fluid properties - 100.00 %, hole vol.
Pumped Water spacers - volume 30.000 bbl
Pump 5 bbl water, Test lines to 3500 psi, pump 25
bbls of water
Required volume of spacer pumped
Mixed and pumped slurry - 50.000 bbl
mix & pump 250 sx Class 'G' w/.20% CFR-3+.20%
halad 344+.35& HR-5, mixed at 15.8ppg - mix cement at
3.5 bpm 2700 psi
Cement mixed
Displaced slurry - 121.000 bbl
pump 5 bbls of water followed by 116 bbls of mud -
displace to balance plug - CIP at 1630 hrs 1/11/97
- Est top of cement at 15600' w/40% excess of open
hole
Slurry at required depth, stopped the displacement
2-7/8in. Cement stinger workstring run
Pumped out of hole to 14230.0 ft
Pooh 25 stands to 14230'
Began precautionary measures
Circulated at 14230.0 ft
Circulate bottoms up at 4 bpm 3500 psi - no cement
back
Obtained clean returns - 100.00 % hole volume
Pulled out of hole to 12372.0 ft
pooh 24 stands to 12372'
At Setting depth · 12372.0 ft
depth of 2nd plug
Cement · Abandonment plug
Circulated at 12372.0 ft
Circulate & condition mud - Balance mud wt. at 9.9
PPg
Obtained req. fluid properties - 100.00 %, hole vol.
Pumped Water spacers - volume 16.000 bbl
Pump 6 bbls of water, test lines to 3500 psi,
followed by 10 bbls of water
Required volume of spacer pumped
Mixed and pumped slurry - 25.000 bbl
Mix 125 sx Class 'G' W/.20% CFR-3+.20% Halad
344+.22% HR-5, mixed at 15.8 ppg
Cement pumped
Displaced slurry - 78.000 bbl
Displace with 10 bbls of water, followed by 68 bbls
of mud with rig pump - CIP at 2345 hrs 1/11/98 -
Est top of cement at 11980'
Slurry at required depth, stopped the displacement
Cement stinger. 2-7/8in workstring run
Pumped out of hole to 10532.0 ft
pooh 20 stands to 10532'
Began precautionary measures
Circulated at 10532.0 ft
Facility West Beach
Datefrime
02:30
02:30-03:30
03:30
03:30-06:00
03:30-06:00
06:00-11:30
06:00-11:30
11:30
11:30-16:00
11:30-15:30
15:30
15:30-16:00
16:00
16:00-17:30
16:00-16:30
16:30
16:30-16:45
16:45
16:45-17:00
17:00
17:00-17:30
17:30
17:30-06:00
17:30-18:00
18:00
18:00-19:00
19:00
19:00-21:00
21:00
Progress Report
Well WB-05A Page 53
Rig POOL6 Date 11 August 99
Duration
Activity
1 hr
2-1/2 hr
2-1/2 hr
5-1/2 hr
5-1/2 hr
4-1/2 hr
4 hr
1/2 hr
1-1/2 hr
1/2 hr
1/4 hr
1/4 hr
1/2 hr
12-1/2 hr
1/2 hr
1 hr
2 hr
Obtained clean returns - 100.00 % hole volume
Pumped out of hole to 7792.0 ft
Pooh stand back 4" drill pipe
Stopped: To change handling equipment
Laid down 2400.0 ft of 2-7/8in OD drill pipe
Finish Laying down 2 7/8" drill pipe - Clear rig
floor of rental tools
Laid down 2400.0 ft of 2-7/8in OD drill pipe
Rig up GBR equipment - Pooh lay down 2 7/8" drill
pipe - 80 jts of 255 down at 0600 hrs
2-7/8in. Cement stinger workstring run (cont...)
Laid down 7800.0 ft of 2-7/8in OD drill pipe (cont...)
Rig up GBR equipment - Pooh lay down 2 7/8" drill
pipe - 80 its of 255 down at 0600 hrs
255 joints laid out
4in. Cement stinger workstring run
Installed Cement retainer
Make up 7" EZSV - TIH on 4" drill pipe - break
circulation & set Retainer at 9007' DPM
Stopped: To test equipment
Tested Cement retainer - Via string
Test 7" EZSV & 7" Casing to 3000 psi for 30 minutes
- ok
Pressure test completed successfully - 3000.000 psi
Cement: Abandonment plug
Circulated at 9007.0 ft
Circulate & Sting into EZSV - Establish injection
rate with rig pump at 2 bpm 900 psi, 4 bpm 1250 psi
Obtained req. fluid properties - 0.10 %, hole vol.
Pumped Water spacers - volume 10.000 bbl
Pump 10 bbls of water ahead, Test lines to 3000 psi
Required volume of spacer pumped
Mixed and pumped slurry - 20.000 bbl
Mix & Pump 100sx Class 'G' w/.20%CFR-3+.20%
Halad-344+.15% HR-5, Mixed at 15.8 ppg
Cement pumped
Displaced slurry - 89.000 bbl
Displace with 5 bbls of water, followed by 84 bbls
of mud with rig pump - unsting from retainer & dump
5 bbls of cement on top of retainer - Est top of
Cement at 8876'
Slurry at required depth, stopped the displacement
15 bbls of cement squeezed below retainer
Cement stinger. 4in workstring run
Pulled out of hole to 8819.0 ft
Pooh stand back two stands of drill pipe
Began precautionary measures
Circulated at 8819.0 ft
Circulate out long way - no cement back
Obtained clean returns - 100.00 % hole volume
Reverse circulated at 8819.0 ft
Displace to seawater - clean returns
Hole displaced with Seawater - 100.00 % displaced
Facility
Date/Time
13 Jan 98
14 Jan 98
Progress Report
West Beach
Well WB-05A Page 54
Rig POOL6 Date 11 August 99
21:00-06:00
21:00-06:00
06:00-08:00
06:00-08:00
08:00
08:00-17:00
08:00-12:00
12:00
12:00-17:00
17:00
17:00-18:00
17:00-18:00
18:00
18:00-00:00
18:00-00:00
00:00
00:00-03:00
00:00-03:00
03:00
03:00-05:00
03:00-05:00
05:00
05:00-06:00
05:00-06:00
05:00-06:00
06:00-14:00
06:00-14:00
Duration
9 hr
9 hr
2 hr
2 hr
9 hr
4 hr
5 hr
1 hr
1 hr
6 hr
6 hr
3 hr
3 hr
2 hr
2 hr
1 hr
I hr
1 hr
8 hr
8 hr
Activity
Laid down 8500.0 ft of 4in OD drill pipe
Finish pooh laying down 4" 14g s~135 drill pipe
rental string
Laid down 8500.0 ft of 4in OD drill pipe
pooh Lay down 4" 144t FH rental drill pipe - 8500'
down at 0600 hrs
4in. Cement stinger workstring run (cont...)
Laid down 9007.0 ft of 4in OD drill pipe (cont...)
pooh Lay down 4" 14~ FH rental drill pipe - 8500'
down at 0600 hrs
295 joints laid out
Derrick management
Laid down 8804.0 ft of Tubing
RIH with 94 stands of 3 1/2" 9.3 # L-80 NSCT & Eue
tubing
Completed operations
Laid down 4800.0 ft of Tubing
Lay down 152 jts tubing
Stopped · To circulate
Fluid system
Freeze protect well - 100.000 bbl of Diesel
Freeze protect well with 1000 bbls of warm diesel -
Freze protected to 2600'
Completed operations
Derrick management
Laid down 4000.0 ft of Tubing
Finish pooh laying down tubing - rig down tubing
tongs - clear floor
Completed operations
Derrick management
Rigged down Kelly
Lay down Kelly, Swivel, & Kelly bushing - Clear
floor
Equipment work completed
Wellhead work
Installed Tubing hanger
Make up 11 x 4 1/2" FMC tubing hanger with 4 1/2"
NSCT landing thread - install one jr of 4 1/2" 12.64~
L-80 IBT tubing below hanger - install two way
check valve ~ Landing tubing hanger & run in lock down
screws
Eqpt. work completed, running tool retrieved
Nipple down BOP stack
Rigged down BOP stack
Nipple down BOP stack
Rigged down BOP stack
Finish nipple down Bop stack: Break Hydrill cap,
Nipple down & remove 13 5/8" 5000g Hydrill, Change
top rams to 5", open all ram doors & clean out -
Nipple down 13 5/8" 5000g Hydrill stack & remove
from cellar
Nipple down BOP stack (cont...)
Rigged down BOP stack (cont...)
Finish nipple down Bop stack: Break Hydrill cap,
1 IJ kit Ill,
Facility
Date/rime
15 Jan 98
16 Jan 98
17 Jan 98
18 Jan 98
Progress Report
West Beach
Well WB-05A Page 55
Rig POOL 6 Date 11 August 99
14:00
14:00-18:00
14:00-16:30
16:30
16:30-18:00
18:00
18:00-06:00
18:00-06:00
06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
06:00-06:00
Duration
4 hr
2-1/2 hr
1-1/2 hr
12hr
12hr
24 hr
24 hr
24 hr
24 hr
24 hr
24 hr
24 hr
24 hr
24 hr
24 hr
24 hr
Activity top rams to 5", open all ram doors & clean out -
Work completed, equipment laid out
Wellhead work
Installed Adapter spool
Nipple up FMC 11 x 4 1/16" tubing head adapter -
Test pack-off to 5000 psi for 15 minutes - ok
Equipment work completed
Installed Manual master valve
Nipple up 4 1/16" 5000g McEvoy Master valve with 4
1/16" tree cap ( dry hole tree) - test valve to
5000 psi -ok - Pull Two way check valve - Install BPV
Eqpt. work completed, running tool retrieved
Fluid system
Cleared Sand traps
Finish cleaning mud pits, Clean cellar area, Clean
water from all drains & sumps, Clean dewatering
house - Rig Released at 0600 hrs 1/15/98
Equipment work completed
Fuel on Board at Release time: 8376 gals ( 5376
gals rig, 3000 gals camp)
Move rig
No accidents, No Spills, 105 DSLTA, 105 DSLS
Rigged down Drillfloor / Derrick
Lay down driller & odd driller side derrick legs -
remove derrick leg shoes - haul derrick out to
storage pad
Rigged down Drillfloor / Derrick
Rig down rig floor, Remove Iron roughneck, Rig down
pipe skate, L/D stabbing board, mud lines - Move
pipe shed to stagging area
Rigged down Drillfloor / Derrick
Remove windwalls, Iron roughneck,swivel & back wind
walls - Lay down derrick- unstring derrick- Remove
top & middle sections of derrick
Rigged down Drillfloor / Derrick
Rig down derrick board, Blow down stream lines,
Remove V door, Remove Wind walls, Remove gas buster,
Remove Accumulator house, prepare to lower derrick
Move rig (cont...)
No accidents, No Spills, 105 DSLTA, 105 DSLS
Rigged down Drillfloor / Derrick (cont...)
Rig down derrick board, Blow down stream lines,
Remove V door, Remove Wind walls, Remove gas buster,
Remove Accumulator house, prepare to lower derrick
Move rig (cont...)
No accidents, No Spills, 105 DSLTA, 105 DSLS
Rigged down Drillfloor / Derrick (cont...)
Rig down derrick board, Blow down stream lines,
Remove V door, Remove Wind walls, Remove gas buster,
Remove Accumulator house, prepare to lower derrick
Move rig (cont...)
No accidents, No Spills, 105 DSLTA, 105 DSLS
Rigged down Drillfloor / Derrick (cont...)
Rig down derrick board, Blow down stream lines,
Remove V door, Remove Wind walls, Remove gas buster,
lk~,lllO 'gU Z'~..~,UIIILIlO. LUI IIUU.~,S })IU[JO. IU tO I ......
Facility
Date/Time
19 Jan 98
West Beach
06:00
Progress Report
Well WB-05A
Rig POOL 6
Page
Date
Duration
Activity
Equipment work completed
Rig Demob'd. Log closed by TCC.
56
11 August 99
Anadrill
1111 East 80th Avenue
Anchorage, Alaska 99518-3304
(907) 349-4511
(907) 349-2487 (fax)
Date:
Well Name:
Company:
API Number:
Location:
Field:
Rig:
.'
Anadrill Personnel
12 January, 1998 ~'h¢'~ .-
WB-5, WB-5A ~
ARCO Alaska Inc.
50-029-22817-00, 50-029-22817-01
North Slope, Alaska
West Beach
POOL Arctic Alaska # 6
Field Crew:
Cell Managers:
Emmanuel Kuntz
Andl'd Nutter
LWD Engineers:
Mark St Amour
Jeroen Bosse
Field Support:
Alaska District Manager: Martin Varco
Field Service Manager: Craig Brown
SERVICES PROVIDED
Directional Logging Service (DLS)
Quad Cmnbo (CDR, ADN, ISONIC)
VISION 475 (IMPulse, ADN4)
IMPulse
VISION 475 (IMPulse, ADN4)
IMPulse
ADN
IMPulse
Service Dates
21 Nov 97 - 14 Nov 97
15 Nov 97 - 5 Dec 97
5 Dec 97 - 15 Dec 97
15 Dec 97 - 16 Dec 97
18 Dec 97
19 Dec 97 - 20 Dec 97
24 Dec 97 - 27 Dec 97
30 Dec 97 - 02 Dec 98
Depth Interval
Spud - 15,744 ft
15,744 ft - 17,041 ft
15,242 ft - 16,677 ft
16,677 ft- 17,838 ft
16,530 ft - 16,880 fi (ream section)
17,838 fi- 18033 fl
18033 ft- 18033 ft
18033 ft- 18033 ft
OPERATING STATISTICS
Total MWD Pump Hours:
Total MWD Below Rotary Hours:
Total MWD Footage:
Total MWD Runs:
635.2
1159.65
17,041 fi (WB-5) 18,033 fi (WB-5A)
16
JOB PERFORMANCE
Directional
The surface hole (12 lA") was drilled to 6640' with Anadrill providing toolface orientations, conventional
surveys at connections and real time surveys while sliding. The 8 ½" section was drilled to 17,041 ft with
the same services (although last run was in rotary mode). Run # 5 was an outstanding run with a footage of
9104 ft at an average of 93 feet per hour.
In compliance with JORPS, two different MWD tools were picked up for each open hole section. Check
shot surveys were taken when going back in open hole. Run 1 and 5 had no benchmarks (conductor and 9
5/8" casing).
Decision was made to sidetrack with a 6" bit at 15,242 ft. Due to the fact that the casing was stuck, the
open hole section enabled to check the IMPulse in the open hole.
Formation evaluation
Real-time GR values were provided in order to identify formation lithology for the surface hole and the
tangent section. There have been no problems during the DLS run.
For the evaluation of the reservoir in real time, Anadrill introduced the ISONIC 6 for a field test. Combined
with the 'Triple Combo' (GR, resistivity, Density/Porosity), it gave the first 6" 'Quad Combo', providing
two different porosity's and also seismic correlation (after the adequate processing).
For the last 8 ½" run, a failure occurred which prevented any real time data from the ADN6 and ISONIC6
fi'om being sent uphole. Recorded memory data was flawless.
For the 6" sidetrack, Anadrill introduced VISION 475, a real time 'Triple Combo', composed of the
IMPulse and the ADN4. A surface failure prevented the ADN4 from being run in a run. IMPulse was used,
at a 10w data rate in order to provide good Real Time data. VISION 475 was to be used in the final run,
reaming the last 1200' to bottom. Hole problems prevented getting to bottom, and only an additional 350'
were logged.
After being released upon reaching TD at 18033', it was not possible to get the 3 ½" tubing to bottom.
Anadrill was called back to the rig to run the ADN4 in the hole on a cleanup run and mad pass. After that
attempt, and another to get to bottom, IMPulse and a motor were run in the hole. It was determined that the
hole was sidetracked and no further attempts were made to get to TD (18033').
Lessons learned
During run # 2, new drill pipe was picked up. Bringing the pumps up after connection, the Powerpulse was
quickly plugged with cement that was present in the pipes. A closer inspection of the new pipes would have
prevented this failure.
Experiencing a lot of surface noise at the end of the 8 ½" section, a downlink was successfully made at
16,700 ft to shift the Powerpulse's operating frequency. For the first time the tool was used at 16 Hz. In that
range of frequency, the harmonics from the pump noise are surprisingly low compared to 12 and 20 Hz.
Running at 16 Hz / 3.0 bps, no problems were encountered. When using 6.75" and larger tools, we will
now operate them at 16 Hz on this rig. With the 4.75" tools, the two available frequencies are .5 Hz and 12
Hz. The first couple of runs we struggled against the pump noise at 12 Hz. We then used the tool at .5Hz
for the last three runs. The signal was much better at this frequency, but the real time data rate is much
lower in this mode.
When tripping out for a bit change, we should pick the BHA all the way up to have a look at the bit before
retrieving data from the LWD tools. At the end of run #7, the bit had a lost cone and fishing for it was
necessary. The LWD string had to be laid down. Looking at the bit first would have led to the same
conclusion but the data would have been retrieved in the pipe shed, thus saving rig time.
At the end of run 12 with VISION 475, the BOP stack had to be tested. We decided to rack the BHA,
expecting a short test time. A problem with the draining of the mud motor left the string full of mud. When
freezing, the ice expanded and damaged the tools, which could not be used. Any time the BHA is not going
to be run as soon as the data is retrieved and the bit changed, the BHA should be laid down.
Anadrill appreciated the opportunity to provide BP Exploration with MWD and LWD services on WB-5
and WB-5A.
Sincerely,
Craig Brown
Field Service Manager
Emmanuel Kuntz
Field Cell Manager
Andrd Nutter
Field Cell Manager
~ Anaddll ~
·
Client: SSD
Field: West Beach
Well Name: WB-5A Spud Date: 21.-Oct-97
APl number: 50-029-22817.01 Last survey date: 20-Deo-97
Job number: 40001542 ~ Total accepted surveys: 224
Rig: POOL 6 MD of first survey: 0.00 FT
County: NSB MD of last survey: 18033.00 FT
State: AK
Survey Calculations
Calo method for positioMinimum Curvature
Calc method for DLS: Mason & Taylor
Depth references
·
Permanent datum
Depth reference
GL above Permanent
KB above Permanent
DF above Permanent
MSL 0.00 FT
DF 41.00 FT
Vedical section origin
41.00
Latidude (+N/S-): 0.00 FT
Departure (+E/W-): 0.00 FT
Azlm from rotary table to target: 80.63
Schlumberger ANADRILL Survey Report
degrees
Seq Measured
# Depth
1 0,00
2 151.67
3 231.27
4 332.49
5 424.20
Incl Azimuth Course
angle angle length
0.00 0.00 0.00
0.17 71.90 151.70
0.23 114.22 79.60
0.21 87.21 101.20
0.22 105.61 91.70
6 513.41
7 603.15
8 692,22
9 780,90
10 869.06
960.91
1052.07
1146.33
1242.12
1336.92
0.33 100.26 89,20
0.57 88.41 89.80
0.43 95.80 89.00
0.37 82.04 88.70
0.49 86.24 88.20
11
12
13
14
15
1428.48
1523.30
1617.72
1709.04
1798.74
0.65 87.48 91.80
0.82 70.53 91.20
1.12 60.51 94.20
1.38 57.88 95.80
1.43 56.92 94.80
16
17
18
19
20
1897.92
1989.42
2083.38
2177.73
2261.13
1.32 57.75 91.60
1.48 64.56 94.80
1.42 63.50 94.40
1.47 64.91 91.30
1.56 63.96 89.70
21
22
23
24
25
2360.93
2458.77
2548.16
2647.10
2741.02
1.81 64.49 99.20
2.13 62.60 91.50
3.21 64.08 94.00
4.82 62.18 94.30
5.97 57.17 83.40
26
27
28
29
30
6.65 56.66 99.80
7.83 54.33 97.90
9.41 57.34 89.40
11.46 61.15 98.90
13,63 63.03 93.90
TVD
depth
0.00
151.70
231.30
332.50
424 ,20
513.40
603.19
692.19
780.89
869.09
960.88
1052.07
1148.26
1242.04
1336.81
1428.38
1523.15
1617.52
1708.79
1798.46
1897.62
1989.07
2082.96
2177.03
2260.06
2359.25
2456.37
2544.76
2642.02
2733.67
Geomagnetic data
Magnetio Model: BGGM 1996 Version
Magnetic Date: 20-.Oct-97
Magnetic field strength: 1147,54 HCNT
Magnetic dec (+E/W-): 28.56 degrees
· Magnetic Dip: 80.79 degrees
MWD S. urvey Reference Criteria
Reference G: 1002,68 milliG
Reference H: 1147,53 HCNT
Reference Dip: 80.79 degrees
Tolerance G: 3.00 milliG
Tolerance H: 7.00 HCNT
Tolerance Dip: 0.30 degrees
Correction
Magnetic dec (+E/W-): 28.56 degrees
Grid convergence (+E/W-)O.00 degrees
Total az corr (+E/W-): 28.56 degrees
Vertical Displacement Total
section +N/S- +E/W- displac'*
(.) (ft~ (n)
0.00 0.00 0.00 0.00
0.22 0.07 0.21 0.23
0.44 0.04 0.47 0.47
0.75 -0.03 0.84 0.84
1.03 -0.07 1.18 1.18
1.37 -0.16 1.60 1.61
1.99 -0.20 2,30 2.31
2.68 -0.22 3.07 3.08
3,24 -02,t 3.69 3.69
3,86 .0,15 4,35 4.35
4.71 -0.10 5.26 5,26
5.83 0.14 6.39 6.39
7.42 0.82 7.83 7.87
9.50 1.89 9.62 9.80
11.81 3.15 11.58 12.00
13.99 4.33 13.43 t4.11
16.29 5.44 15.46 16.39
18.68 6.48 17.61 18.76
20.99 7.49 19.68 21.05
23.36 8.51 21.82 23.42
26.27 9.78 24.44 26.33
29.42 11.18 27.26 29.48
33.80 13.13 31.18 33.63
40.39 16.13 37.06 40.42
48.20 20.12 43.80 48.20
59,07 26.10 53.00 59.07
71,25 33.11 63.15 71.30
84.49 40.61 74.24 84.62
102.32 49.71 89.66 102.52
122.70 59.23 107.69 122.91
Page 1
at Azm DLS Srvy Tool
(deg/ tool quality
(deg) lOOf~) type type
0.00 0,00 TIP -
71.90 0,11 MWD 6-axis
85.02 0,19 MWD 6-axis
92,25 0.10 MWD 6-axis
93.50 0.08 MWD 6-axis
95.87 0.13 MWD 6-axis
94.92 0.29 MWD 6-axis
94.08 0.17 MWD 6-a~ds
93.31 0.t3 MWD 6-axis
91.96 0.14 MWD 6-axis
91.09 0.17 MWD 6-axis
88.74 0,30 MWD 6-axis
84.63 0.36 MWD 6-axis
78.87 0,28 MWD 6-axis
74,80 0.06 MWD 6-axis
72,12 0.12 MWD 6-axis
70,61 0.24 MWD 6-axis
69,78 0.07 MWD 6-axis
69.17 0.07 MWD 6-axis
68.69 0.10 MWD 6-axis
68.20 0.25 MWD 6-axis
67.70 0.36 MWD 6-axis
67.16 1.15 MWD 6-.axis
68.47 1.71 MWD 6-axis
65.33 1.49 MWD 6-axis
63.78 0.68 MWD 6-axis
62.33 1.24 MWD 6-axis
61.32 1.84 MWD 6-axis
60.99 2.19 MWD 6-axis
61.19 2.35 MWD 6-axis
L
Schlumberger ANADRILL Survey Report .
Seq Measured Incl Azimuth Course 'I'VD Vertical Displacement Total at Azm DLS Srvy Tool
# Depth angle angle length depth section +N/S- .+E/W- displacr~ (deg/ tool quality
89 8256.11
90 8346.12
91 8442.22
92 8532.64
93 8626.41
94 8719.93
95 8813.67
96 89O5.24
97 9000.92
98 9093.92
99 9188.58
100 9283.31
101 9378.35
102 9471.51
103 9562.47
104 9655.14
105 9749.02
106 9841.55
107 9935.77
108 10028.81
109 1O125.70
110 10217.79
111 10311.9O
112 10407.57
113 10499.78
114 10594.31
115 10688.49
(deg) (deg) (fl) (fi) (R) (fl) (fi) (fl) (deg) 1000 type type
67.08 64.41 93.10 5426.92 4679.03 2387.47 4045.67 4697.60 59.45 1.85 MWD 6-a)ds
67.40 64.09 90.00 5461.74 4762.02 2423.52 4120.42 4780.31 59.54 0.47 MWD 6-axis
67.34 64.09 96.10 5498.71 4850.72 2462.27 4200.21 4868.73 59.62 0.05 MWD 6-axis
69.76 62.89 90.40 5531.77 4934.84 2499.81 4275.50 4952.67 59.69 2.95 MWD 6-axis
68.74 64.48 93.80 5565.00 5022.54 2538.68 4354.13 5040.17 59.76 1.93 MWD 6-axis
67.61 64.53 93.50 ~5599.77 5109.34 2576.04 4432.47 5126.68 59.84 1.21 MWD 6-axis
65.99 64.02 93.80 5636.72 5195.55 2613.50 4510.13 5212.64 59.91 1.80 MWD 6-axis
65.91 62.05 91.50 5674.01 5279.07 2651.43 4584.57 5296,07 59.96 2.00 MWD 6-axis
66.97 68.45 95.70 5712.28 5366.76 2689.51 4663.56 5383.52 60.03 4.45 MWD 6-axis
68.44 68.15 93.00 5747.56 5452.69 2722.64 4742.97 5468.87 50.14 2.31 MWD 6-axis
67.98 68.63 94.70 5782.71 5540.43 2755.01 4824.72 5555.90 60.27 0.62 MWD 6-axis
68.56 67.33 94.70 5819.30 5627.62 2787.80 4905.68 5642.47 60.39 1.96 MWD 6-axis
67.44 68.12 95.10 5856,46 5715.02 2821.01 4986.67 5729.31 60.50 1.21 MWD 6-axis
69.04 68.23 93.10 5890.98 5801.31 2853.19 5056.92 5815.02 60.62 1.72 MWD 6-axis
69.43 70.22 91.00 5923.24 5886.12 2883.40 5146.46 6899.16 60.74 2.10 MWD 6-axis
68.82 67.39 92.60 5956.24 5972.39 2914.68 5227.12 5984.83 60.86 2.90 MWD 6-axis
68.45 67.46 93.90 5990.45 5059.73 2948.22 5307.88 5071.70 60.95 0.41 MWD 6-axis
67.83 67.27 92.60 6024.93 6145.56 2981.24 5387.22 6157.tl 61.04 0.70 MWD 6-axis
67.04 66.45 94.20 6061.29 6232.40 3015.33 5467.17 6243.57 61.12 t.15 MWD 6-axis
68.64 67.02 93.00 6096.37 6318.46 3049.33 5546.30 6329.29 61.20 1.79 MWD 6-axis
69.33 67.62 96.90 6131.12 6408.81 3084.24 5629.75 6419.24 61~8 0.92 MWD 6-axis
69.06 66.72 92.10 6163,83 6494.81 3117.67 5709.09 6504.88 61.36 0.96 MWD 6-axis
69.31 67.76 94.10 6197.27 6582.67 3151.68 5790.20 6592.38 61.44 1.12 MWD 6-a~ds
69.25 65.82 95.70 6231.13 6672.11 3186.94 6872.47 6681.50 61.51 1.96 MWD 6..axis
69.23 66.81 92~0 6263.81 6758.28 3221.59 5951.41 6767.42 61.57 1.01 IVNVD 6-axis
69.25 66.93 94.50 6297.31 6846.57 3255.33 6032.66 6855.41 61.64 0.10 MWD 6-axis
69.00 65.06 94.20 6330.88 6934.56 3292.13 6113.06 8943.17 61.70 1.81 MWD 6-axis
116 10780.10
117 10875.72
118 10966.14
119 11061.62
120 11155.73
121 11252.33
122 11347.89
123 11441.19
124 11533.67
125 11628.28
126 11721.01
127 11812.69
128 11904.43
129 11998.23
130 12093.63
131 12187.52
132 12282.99
133 12378.13
134 12472.57
135 12567.29
136 12662.14
137 12756,66
138 12852.08
139 12949.49
140 13048.16
141 13142.81
142 13229.32
143 13325.60
68.94 65.35 91.50 6353.75 7020.05 3327.99 6190.67 7028.51 61.74 0.21 MWD 6-axis
69.01 67.00 95.60 6398.05 7109.25 3354.07 6272.29 7117.48 61.79 1.66 MWD 6-axis
68.79 64.98 90.40 6430.60 7193.55 3398.37 6349.33 7201.59 61.84 2.08 MWD 6-ax~s
69.09 65.81 95.50 6464.91 7282.66 3435.47 6430.36 7290.54 61.89 0.84 MWD 6-axis
69.16 66.17 94.10 6498.45 7370.56 3471.23 6510.68 7378.24 61.94 0.40 MWD 6-axis
69.03 65.18 96.60 6532.92 7480.78 3508.37 6592.93 7468.29 61.98 0.98 MWD 6-a)ds
69.09 68.23 95.60 6567.08 7550.95 3545.11 6874.30 7557.39 62.02 0.98 MWD 6-axis
66.81 65.09 93.30 6602.11 7536.50 3580.75 6753.08 7643.68 62.07 2.68 MWD 6-axis
65.91 65.23 92.50 6639.20 7721~3 3616.36 6829.97 7728.30 62.10 0.98 MWD 6-axis
65.84 66.95 94.60 6677.87 7807.53 3651.34 6908.90 7814.42 62.14 1.74 MWD 6-axis
66.03 66.82 92.70 6715.67 7892.10 3684.55 6986.76 7898.78 62.19 0.28 MWD 6-axis
66.28 68.78 91.70 6752.74 7975.84 3716.24 7054.41 7982,25 62.25 2.0t MWD 6-axis
66.68 68.97 91.70 6789.34 8059,77 3747.87 7142.31 8065.92 62.31 1.85 MWD 6-axis
66.90 67.06 93.80 6826.31 8145.90 3781.49 7221.69 8151.84 62.36 0.25 MWD 6-axis
67.12 67.43 95.40 6863.57 8233.62 3815.45 7302.68 8239.34 62.41 0.37 MWD 6-axis
67.05 66.29 93.90 6900.13 8320.04 3849.45 7382.21 8325.58 62.46 1.08 MWD 6-ax~s
67.12 66.17 95.50 6937.31 8407.96 3884.88 7462.72 8413.35 62.50 0.12 MWD 6-axis
67.27 67.39 95.10 6974.17 8495.56 3919.41 7543.30 8500.77 62.54 1.17 MWD 6-axis
66.41 68.13 94.50 7011.34 8582.31 3952.31 7623.71 8587.30 62.60 1.14 MWD 6-axis
67,22 68.95 94.70 7048.63 8669.15 3984.14 7704.73 8673.68 62.66 1~2 MWD 6-axis
67.46 69.46 94.80 7085.15 8756.33 4015.13 7786.54 8760.79 62.72 0.55 MWD 6-axis
67.49 68.55 94.60 7121.39 8843.45 4046.38 7868.14 8847.65 62.78 0.88 MWD 6-axis
67.37 70.90 95.40 7158.01 8931.17 4076.87 7950.78 8935.09 62.85 2,23 MWD 6-axis
67.26 70.57 97.40 7195.57 9020.51 4106.49 8035.62 9024.11 62.93 0.31 MWD 6-axis
67.43 70.98 98.70 7233.59 9111.05 4136.45 8121.64 9114.34 63.01 0.41 MWD 6-axis
67.33 70.94 94.60 7269.98 9197.83 4164.95 8204.18 9200.84 63.08 0.14 MWD 6-axis
67.23 70.47 86.50 7303.38 9277.16 4191.32 8279.49 9279.93 63.15 0.44 MWD 6-axis
67.19 68.57 96.30 7340.69 9365.60 4222.34 8362.67 9368.16 63.21 1.82 MWD 6-axis
144 13423.87 67.28 68.82 98.30 7378.73 9456.00 4255.26 8447.12 9458.39 63.26 0.21 MWD 6.-axis
145 13514.41 67.34 69.52 90.50 7413.64 9539.23 4284.98 8525.15 9541.45 63.31 0.72 MWD 6-axis
146 13608.79
67.19 67.96 94.40 7450.12 9626.06 4316.54 8606.29 9628.12 63.36 1.47 MWD 6-axis
Page 3
I Seq Measured
# Depth
Schlumberger ANADRILL Survey Report
147 13709.36
148 13803.21
149 13898.38
150 13993.07
Incl
angle
66.97
67.31
67.16
66.85
Azimuth Course 'I'VD Vertioal Displacement Total
angle length depth section +N/S- .+E/W- displacr~
/de~/ (~) ,, (~ ~"~ ~") ("7
68.30 100.60 7489.30 9718.53 4351.02 8692.29 9720.46
68.60 93.80 7525.74 9804.76 4382.77 .8772.68 9806.56
68.46 95.20 7562.58 9892.33 4414.87 8854.38 9894.00
70.19 94.70 7599.57 9979.20 4445.61 8935.95 9980.72
151 14088.05
152 14186.00
153 14280,76
154 14362.02
155 14442.23
66.63
66.60
66.62
66.50
66.60
69.12
68.42
68.36
69.05
69.28
95,00 7637.09 10066,13 4475.96 9017.78 10067.51
97.90 ~7675.95 10155,75 4508.53 9101.53 10157.00
94.80 7713.58 10242.56 4540.56 9182.43 10243.72
81.20 7745.88 10316.86 4567.56 9251.87 10317.93
80.20 7777.80 10390,19 4593.69 9320.65 10391.17
156 14523.29
157 14618.69
158 14711.52
159 14805.24
160 14900.34
161 14993.74
162 15088.69
163 15181.18
164 15262.13
165 15363.07
66.51
68.44
66.44
66.09
65.72
65.18
65.01
64.56
63.47
65.14
69.05
69.08
68.71
67.35
67.70
68.15
68,36
68.11
65.51
62.81
81.10 7810.07 10464,36 4620.17 9390.18 10455.25
95.40 7848.15 10551.56 4651.45 9471.87 10552.36
92.80 7865.24 10636,38 4582.07 9551.23 10637.09
93.70 7922.96 10721.99 4714.13 9630.78 10722.64
95.10 7961.78 10808.68 4747.28 9711.02 10809.28
93.40 8000.59 10893.49 4779.18 9789.76 10894.03
95.00 8040.59 10979.47 4811.04 9869.82 10979.95
92.50 8080.00 11062.98 4842.05 9947.55 11053.41
80.90 8115.45 10673.76 4870.68 10014.38 11136.04
101.00 8159.24 10761.01 4910.37 10096.27 11227.04
166 15391.69
167 15481.30
168 15513.02
169 15544.86
170 15576.24
171 156O9.6O
172 15641.19
173 15672.98
174 15704.47
175 15735.77
176 15766.92
177 15826.92
178 15858.39
179 15890.15
180 15921.36
181 15952.39
182 15984.16
183 16015.56
184 16046.33
185 16077.56
186 16108.65
187 16138.71
188 16170.00
189 16208.37
190 16233.18
191 16264.40
192 16295.09
193 16334.01
194 16359,53
195 16391.21
196 16421.55
197 16454.53
198 16485.81
199 16517.43
200 16549.41
201 16581.01
202 16612.07
203 16690.44
204 16721.28
205 16776.83
64.68
62.62
60.44
57.79
55.85
64.43
53,09
51.50
49.66
47.61
45.46
45.02
44.61
44.68
44.65
45.44
46.88
48.81
50.19
51.77
53.61
64.68
55.84
57.55
59.33
61.09
62.68
64.64
66.25
67.99
70,21
71.72
71.39
71.04
71.30
71.87
71.70
71.35
71.15
70.75
61.53
61.91
63.48
60.74
61.70
59.95
60.27
59.98
58.83
59.39
59.55
61.90
65.5O
69.45
71.32
'74.80
74.35
75.47
76.63
77.96
77.45
77.00
76.95
80.16
80.57
83.85
85.35
85.38
85.71
65,57
65.75
84,04
84,37
84.33
87.94
89.26
89.34
89.40
89.76
90.84
28.60 8171.37 10785.58 4922.47 101t9.17 11252.92
89.60 8211.14 10861.52 4960.64 10189.86 t1333.14
31.70 8226.25 10888.03 4973.32 10214.61 11361.00
31.90 8242.63 10913.98 4986.12 10238.8t 11388.35
31.30 8259.76 10938.69 4998.74 10261.76 11414.52
33.40 8278.65 10964.47 5012.09 10285.70 11441.88
31.60 8297.63 10988.35 5024.77 10307.80 11457.31
31.80 8316.98 11011.92 5037.29 10329.62 11492.41
31.50 8336.98 11034.60 5049.68 10350.57 11516.66
31.30 8357.66 11056.45 5061.74 10370.72 11540.07
31.10 8379.05 11077.50 5073.20 10390.17 11562.57
60.00 8421.31 11117.56 5094.02 10427.33 11605.10
31.50 8443.66 11138.79 5103.85 10447.23 11627.29
31.80 8466.28 11160,55 5112.40 10467,87 11649.59
31.20 8488.48 11182.13 5119.76 10488.53 11671.38
31.00 8510.38 11203.87 5126.15 10509.51 11693.04
31.80 8532.41 11226.67 5132.26 10531,61 11715.58
31.40 8553.48 11249.83 5138.32 10554,08 11738.44
30.70 8573.42 11273.10 5143.94 10576.74 11761.27
31.30 6593.13 11297.38 5149.28 10600.46 11784.94
31,00 8611.91 11322.00 5154.52 10624.56 11808.90
30.10 8629.64 11346.36 5159.90 10648.35 11832.66
31.30 8647.38 11372.02 5165.71 10573.41 11857.75
38.40 8668.47 11404.09 5172.07 10704.85 11888.83
24.80 8681.45 11425.22 5175.59 10725.69 11909.12
31.20 8696.95 11452.28 5179.24 10752.51 11934.87
30.70 8711.42 11479.28 5181.76 10779.47 11960.25
38.90 8728.68 11514.02 5164.55 10814.22 11992.79
25.50 8739.28 11537.13 5186.35 10837.34 12014.42
31.70 8751.60 11566.22 5188.57 10866.46 12041.65
30.30 8762.41 11594.42 5190.69 10894.59 12068.04
33.00 8773.17 11625.53 5193.47 10925.76 12097,28
31.30 8783.05 11655.16 5196.47 10955.30 12125.25
31.60 8793.25 11685.01 5199.41 10985.07 12153.42
32.00 8803.58 11715.16 5201.47 11015.28 12181.61
31.60 8813.56 11744.85 5202.20 11045.25 12209.03
31.10 8823.29 11774.05 5202.56 11074.79 12235.92
78.30 8848.10 11847.46 5203.41 11149.05 12303.53
30.90 8858.03 11876.36 5203.61 11t78.31 12330.13
55.50 8876.15 11928.08 5203.34 11230.77 12377.60
Page 4 i" ·
at Azrn DLS Srvy
(deg/ tool
(deg) 1000 type
63.41 0.35 MWD
63.45 0.47 MWD
53.50 0.18 MWD
63.55 1.68 MWD
63.60 1.09 MWD
03.65 0.66 MWD
63.69 O.O2 IVNVD
53.72 0.80 MWD
63.76 0.26 MWD
53.80 0.36 MWD
63.85 0.12 MWD
63.89 0.40 MWD
63.92 1.32 MWD
53.95 0,48 MWD
63.98 0,76 MWD
64.01 0,26 MWD
64.05 0,57 MWD
64.05 3.19 MWD
64.05 2.92 MWD
64.06 4,42 MWD
64.04 2.33 MWD
64.04 8.18 MVVD
64.03 11.21 MWD
64.03 6.75 MWD
64.02 5.96 MWD
64.01 4.31 MWD
64.00 5.06 MWD
53.99 6.54 MWD
53.98 6.71 MWD
53.98 6.93 MWD
63.96 2.82 MWD
63.96 8.16 MWD
63.97 8.84 MWD
63.98 4.06 MWD
64.00 8.39 MWD
64.02 4.67 MWD
64.04 6.77 MWD
64.O6 5.26 MWD
64.09 6.13 MWD
64.12 6.O7 MWD
64.15 3.80 MWD
64.17 3.72 MWD
64.21 8.45 MWD
64.24 7.31 MWD
64.28 10.77 MWD
64.33 6.74 MWD
64.39 5.04 MWD
64.43 6.40 MWD
64.48 5.50 MWD
64.52 7.35 MWD
64.58 6.89 MWD
64.62 1.61 MWD
64.67 1.15 MWD
64.72 10.68 MWD
64,78 4.57 MWD
64,84 0.55 MWD
64,98 0.46 MVVD
65.04 1.39 MWD
55.14 1.85 MWD
quality
6-axis
6-axis
6-axis
6-axis
6-axis
6-a)ds
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6-axis
6,-axis
Short
Short
Short
Schlumberger ANADRILL Survey Report
I Seq Measured Incl Azimuth Coume TVD
# Depth angle angle length depth
Iff) (de~) (;deg) Itl) (fi)
Vertical Displacement Total at Azm DLS
section +N/S- .+E/W- displao"~ (deg/
(il) Ill) (fi) (Il) (deg) lOOf)
206 16839.41 70.20 90.48
207 16902.60 69.85 89.76
208 16964.27 69.50 90.12
209 17027.40 69.35 90.12
210 17089.83 68.95 90.12
211 17152.02 69.00 90.10
212 17213.49 69.20 89.40
213 17276.74 69,65 89.76
214 17338.83 70.00 88.32
215 17400.08 69.80 89.76
216 17462.84 69.80 89.04
217 17524.97 70,05 89.76
218 17589.10 69,90 89.76
219 17651.16 69.70 89.40
220 17712.88 70.20 89.40
221 17777.21 70.17 88.67
222 17869.33 70.30 89.40
223 17962.96 70.25 90.12
224 18033.00 70.25 90.12
62.60 8897.07 11986.18 5202.67 11289.77 i2430.87 65.26
63.20 8918.66 12044.75 5202.51 1'1349.16 12484.77 65.37
61.70 8940.09 12101.85 5202.56 11407.02 12537.42 65.48
63.10 8962.26 12160.12 5202.46 11466.10 12591.14 65.60
62.40 8984.47 12217.64 5202.36 11524.41 12644.23 65.70
62.20 9006.79 12274.91 5202.26 11582.47 12697.13 65.81
61.50 9028.73 12331.63 5202.51 11639.92 12749.66 65.92
63.20 9050.94 12390.08 5202.92 11699.09 12803.87 66.02
62.10 9072.36 12447.74 5203.89 11757.37 12857.53 66.13
61.30 9093.43 12504.68 5204.84 11814.92 12910.57 66.23
62.70 9115.08 12562.84 5205.46 11873.76 12964.68 66.33
62.20 9136.43 12620.57 5208.07 11932.18 13018.46 66.43
64.10 9158.38 12680.03 5206.28 11992.40 13073.76 66.53
62.10 9179.82 12737.59 5206.69 12050.68 13127.40 66.63
61.70 9200.97 12794.88 5207.29 12108.64 13180.86 66.73
64.30 9222.77 12854.72 5208.30 12169.12 13236.84 66.83
92.10 9253.92 12940.46 5209.73 12255.79 13317.12 66.97
93.70 9285.54 13027.54 5210.12 12343.99 13398.48 67.12
70.00 9309.19 13092.53 5210.00 12409.87 13459.16 67.23
Srvy Tool I
tool quality
0.99 MWD Short
1,18 MWD Short
0.73 MWD Short
0.24 MWD Short
0.64 MWD Short
0.08 MVVD Short
1.11 I~ND Short
0.93 MWD Short
2.34 MWD Short
2.32 MVVD Short
1.20 MWD Short
1.27 MVVD Short
0.23 MWD Short
0.68 MWD Short
0.81 MWD Short
1.03 MWD 6-axis
0.73 MWD Short
0.71 MVVD Short
0.00 MWD_M Projected
Page 5
GeoQuest
3940 Arctic Blvd
Anchorage, AK 99503
ATTN: Sherrie
NO. 11563
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field: West Beach
10/13/98
LIS
Well Job # Log Description Date BL Sepia Tape
WB-5A 98405 GR-IMPULSE-ADN -~- ~o~p 971 220 1
WB-SA 98405 IMPULSE 971 220 I 1
WB-5A 98405 IMPULSETVD 971220 I 1
WB-5A 98405 ADN4 971 220 I 1
WB-5A 98405 ADN4 TVD 971 220 1 I
SIGNED:
Alaska Oil & Gas Con~. ~ommission
Please sign and return one copy of this transmittal to Sherrle at the above address. Thank you. , Anchorage
ARCO Alaska Inc.
Greater Point McIntyre Engineering
Date:
Subject:
From:
January 28, 1998
Transmittal Number
ARCO Alaska, Inc.
774
To:
Bob Crandall
AOGCC
3001 Porcupine Drive
Anchorage, AK 99501
The following West Beach 5 data are enclosed. This information is confidential and yoUr
cooperation in maintaining confidentiality is appreciated:
Well
Name Data Description Run # Date Run
WB-05A Field Log: Measured Depth Composit Data -ADN4 I
12/19/97
Company
Schlumberger
WB-05A Field Log: True Vertical Depth Composit Data 1
-ADN4
WB-05A Field Log: True Vertical Depth Composit Data 1
-IMPulse
WB-05A Field Log: Measured Depth Composit Data 1
-IMPulse
WB-05 Diskette: Survey Data I
12/19/97
12/20/97
12/20/97
1/12/98
Schlumberger
Schlumberger
Schlumberger
Schlumberger
WB-05A Diskette: Survey Data Side Track
1/12/98 Schlumberger
Please sign one co~
cc: M Morgan ATO-450
and return to:
GPMA Engr Coord., ATO-462
ARCO Alaska, Inc.
P.O. Box 100360
Anchorage, Alaska 99510-0360
Transmittal Number: 774 Page:
STATE OF ALASKA
ALASKA'-~L AND GAS CONSERVATION COiv-~iSSlON
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate
2. Name of Operator
ARCO Alaska Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
104' NSL, 3219' WEL, SEC. 25, T12N, R14E, UM
At top of productive interval
17' NSL, 1986' WEL, SEC. 20, T12N, R15E, UM
At effective depth
17' NSL, 1896' WEL, SEC. 20, T12N, R15E, UM
At total depth
25' NSL, 926' WEL, SEC. 20, T12N, R15E, UM
5. Type of well:
[~ Development
i--I Exploratory
i--I Stratigraphic
i--I Service
6. Datum Elevation (DF or KB)
KBE = 41'
7. Unit or Property Name
West Beach State
8. Well Number
WB-05A
9. Permit Number
97-225
10. APl Number
50-029-22817-01
11. Field and Pool
West Beach/Kuparuk
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
18033 feet
9309 feet
17000 feet
8950 feet
Length Size
Structural
Conductor 80' 20"
Surface 6590' 9-5/8"
Intermediate 9155' 7"
Production
Liner 3136' 4-1/2"
Perforation depth: measured N/A
true vertical
Tubing (size, grade, and measured depth) N/A
Packers and SSSV (type and measured depth) N/A
Plugs (measured)
Junk (measured)
Cemented
260 sx Arcticset (Approx.)
2970 sx PF 'E', 860 sx Class 'G'
125 sx Class 'G'
N/A
ORIGINAL
MD TVD
121' 121'
6630' 4830'
9155' 5770'
9040'- 12176' 5730'-6895'
13. Attachments [~ Description summary of proposal [--~ Detailed operations program [--I BOP sketch
14. Estimated date for commencing operation
January 9, 1998
16. If proposal was verbally approved
Blair Wondzell
Name of approver
Contact Engineer Name/Number: Tom Maunder, 564-5521
1/9/98
Date approved
15. Status of well classifications as:
¢;~ Oil I--I Gas I--~ Suspended
Service
Prepared By Name/Number: Kathy Campoamor, 564-5122
17. I hereby certify that the foregoing is tr~e arid correct to the best of my knowledge
Signed ~ (~~
Steve Shultz (, Title Senior Drilling Engineer
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness
Date
I Approval N 0.~~
Approved Copy Plug integrity ~
Returned Mechanical Integrity Test
~l~Pro~ved b) order of the Commission
BOP Test ~ Location clearance__
Subsequent form required 10- z(O7
0*ovid W, johnston
Commissioner
Date l ~ ~,
Submit ltTri~p~icate ~
Form 10-403 Rev. 06/15/88
West Beach 5a
P&A/Suspension
In late November, West Beach 5 was plugged back to sidetrack to a different bottomhole
location. The well was plugged back and successfully cleaned out to 15400'. After cleanout,
the 7" casing became stuck at 9155' MD (-5770' TVD). Attempts to free the casing were not
successful and it was cemented in place. Sidetrack operations were accomplished by drilling 6"
hole off the cement plug and the new wellbore was TDed at 18033' on December 20.
Potentially productive sands were encountered from about 15800'-16300' and 16910'-TD.
Some hole problems had been encountered drilling the new wellbore, in particular some ledges
between 16900' and 17000' immediately above the Kuparuk objective.
The wellbore was reamed and 3-1/2" liner run on December 23. Unfortunately, the 3-1/2" liner
was not able to pass a ledge at 16960' and was subsequently pulled. Since then the hole has
been repeatedly reamed in a attempt to eliminate the ledges. This has not been successful and
it appears that the wellbore was sidetracked at about 17000'. While reaming deep running
sands were encountered. The mud weight was increased to 11.0 - 11.1 ppg to control the
running sands with some losses experienced. When sidetrack was determined, the decision
was made to run 4-1/2" liner to preserve as much of the wellbore as possible.
4-1/2" liner was run and became stuck with the shoe at 12179' (in lower part of West Sak) on
January 5. A SFT pill was spotted and the mud weight around the liner/running assembly has
been reduced from 11.1 ppg to 9.7 ppg in an attempt to free the pipe. This was not successful.
While fishing the wellbore has stayed full with no flow observed. The 4-1/2" liner was cut at
9034' (above the 7" shoe) and the liner in the casing recovered. An attempt was made to fish
the remainder of the liner, but was not successful.
It is now proposed to abandon the lower sections of the wellbore and preserve the upper
section for possible reentry and sidetrack.
1. PU 2-7/8" PAC DP w/EL fishing tool and recover SOS cutter assembly.
2. PU 3-3/4" mill and 2-7/8" motor on Baker 2-7/8" PAC DP and RIH. Drill out of 4-1/2" liner.
POOH.
3. RIH with open ended pipe as deep as possible. During previous operations, it has usually
been possible to reach 16700' without much problem. Mix and pump abandonment slurry to
bring cement to N15600'.
Based on reaching 16700' and allowing 40% XS pump 260 sx Class G @ 15.8 ppg.
4. POOH to top of cement and circulate clean the long way.
5. POOH to 200' below 4-1/2" shoe. Mix and spot cement from 200' below shoe to 200' inside
4-1/2".
Based on 40% open hole XS as before, the required cement volume is 115 sx.
6. POOH to TOC and circulate clear the long way.
7. POOH and LD PAC DP.
8. PU 7" EZSV on 4" DP and RIH. Set retainer at about 9000'.
Record pressure test on chart.
9. Mix and spot 80 sx of cement to retainer.
Test 7" casing to 3000 psi.
10. Sting in and squeeze 65 sx below retainer. Pull out and spot remaining 15 sx on top of
retainer.
11. POOH to 8900' and reverse DP clean.
12. POOH, LDDP.
13. RIH w/3-1/2" tubing in derrick and tag plug in 7" casing. POOH, LD tubing.
14. With tubing at 3000', circulate top of well to diesel for freeze protection.
15. Finish LD tubulars.
16. Install tubing hanger with 1 jt of 4-1/2" tubing below it.
17. Install TWC. ND BOP. NU tubing head adapter and 4" valve.
18. Release rig.
·
STATE OF ALASKA
ALASKA Oi~'AND GAS CONSERVATION COMMisSiON
APPLICATION FOR SUNDRY APPROVAL
~ UU~
Type of Request: E]Abandon [] Alter Casing
[] Change Approved Program
2. Name of Operator
ARCO Alaska Inc,
3. Address
P.O. Box 196612, Anchorage, Alaska
[] Suspend
[] Repair Well
[] Operation Shutdown
Type of well: [] Development
[] Exploratory.
[] Stratlgraphic
[] Service
99519-6612
4. Location of well at surface
104' NSL, 3219' WEL, SEC. 25, T12N, R14E, UM
At top of productive interval
58' NSL, 2127' WEL, SEC. 20, T12N, R15E, UM
At effective depth
5003' NSL, 3239' WEL, SEC. 29, T12N, R15E, UM
At total depth
.... 68' NSL, 11.76' WEI~ SEC. 20, T12N., R15E~UM
12. Present well condition summary
[] Plugging [--ITime Extension [] Perforate
[] Pull Tubing [] Variance i [] Other
[] Re-Enter Suspended Well [] Stimulate
6. Datu~ Elevation (DF or KB)
i Plan RTE=41'
7. Unit o)' Property Name
West .,Beach State
8. Well N, umber
~ WB-O5A
9. Pe~;n'i~' Number
97-225
I O:AP'
N~mber
I 50-089-22817--01
Ill.'Fl'eld ~nd Pool ....
West Beach/Kuparuk
Total depth: measured 15400 feet
true vertical 8176 feet
Effective depth: measured 15400 feet
true vertical 8178 feet
Casing Length Size
Structural
Conductor
Surface
Intermediate
Production
Liner
Plugs (measured)
Junk (measured)
Cemented
80' 20'
6590' 9-5/8"
9155' 7"
260 sx Arctlcset (Approx.)
2970 sx PF 'E', 860 sx Class 'G'
125 sx Class
RIGINAL
.:MD
;121'
6630'
{~155'
:
TVD
121'
4830'
5770'
Perforation depth: measured
true vertical
N/A
·
Tubing (size, grade, and measured depth) N/A
Packers and SSSV (type and measured depth) N/A
13. Attachments [] Description summary of proposal
RECEIVED
[] Detailed operations program [--I' BOP sketch
14. Estimated date for commencing operation
December 9, 1997
1§. If proposal was verbally approved
Jack Hartz
Name of approver
Contact Englneer NarnelNuinber: Tom Maur~er, 664-562.1
12/5/97
Date ,approved
15. Status of well classifications as:
[]Oil [-~Gas [--~Suspende~l.'
Service I
Prepared By Name/Number~
Kathy Campoamor, 564-6122
17. I hereby certify that tl~foregoti~~ correct to the best of my knowledge
Signed SteveShu~t=,(V~._(~~. Title SenlorDflllingEngineer
Commission Use Only
Conditions of Approval: Notify Commission so representative may.witness
Plug integrity BOP Test ~ Location clearance ~
Mechanical Integrity Test . Subsequent form required 10- ~.0 7
I D, ateJ~?
Approval
Approved by order of the Commission P~
Commissioner
Form 10-403 Rev. 06/15/88
Date
Submit In Triplicate
003
WEST BEACH 5A
BOTTOMHOLE LOCATION CHANGE
The following discussion confirms the conversation between Mr. Jack Hartz, AOGCC
and Mr. Tom Maunder, SS Drilling on December 5, 1997.
Plans had been made to sidetrack West Beach 5 and the required abandonment
Sundry and new APD submitted. The approved permit was received November 29.
Since then, difficulties were encountered running the .7' casing and the owners have
determined that a change in the planned bottomhole location is needed.
It was origlnally-intended to set 7" casing at 15380' MD, immediately above the
abandonment plug at 15400'. Unfortunately, the casing became stuck at 9155' MD and
attempts to free the pipe were not successful. The easing was subsequently cemented
in place. As of 0600, December 6 the rig was testing the BOP in preparation to pick up
the new BHA and begin cleaning out the wellbore to PBTD. It 'is anticipated that the
actual sidetrack will commence late in the evening, December 7.
New directional plans'have been prepared and are included with this discussion. The
TD target has been moved ~of that .previously permitted.~ The KOP has
not been changed and the planned MD of the welibore has only been Increased by
about 50'.
After'discussing the above information with Mr. 'Hartz, he indicated that operations
could proceed and the formal paperwork could be handled on Monday, December 8. in
the interim if further infQrmation is needed, please contact Mr. Dink Helm at the rig
(659-4395) or Tom Maunder (hm-345-0850 or beeper-275-7829).
Drilling Engineer
Attachment: WB-5A (P6)-7 pages
cc: Mr. Dink Helm--Pool 6
.An~d~.L,t !.
A~s,3k,o.
"t~L1 Zaat:: BOt;b A'vef~ne
(907) ~4g-4511 Fax 344-2'i60
;~,-'~ ...... = 10,1 ~ 3:219 rgb s'25 ~ :R14H ON
ZLm-iI~ ~,,~"veF; 5003 F~Z, 3239 ~ g29 ~ 1115~1 UN
Prepa:Gd ..... : 05 DeC /997
Vert: seu~: az.: 80.63
ANADRILL AKA-DPC
FEASIBILITY PLAN
NOT APPROVED FOR
XI CUT[ON
1..C,3S3,70 GS.&3 66.67 R159.$3
15400.00 ' 63.44 66.31 Bl~5,?O
~.c, SOO,O0 59.49 65.62 8223.47
15600.00 SS.Si 54.88 8277.17
~57Q0.00 51.59 64.07 H336.59
~ILB,~ 107G2,84 49U5,4S ~ 10099,05 ] 5979&8.10 5988160.~7
8134.T0 '1029~.35 4938.42 ~ 1Ol2a.~ 69q~Tq.~ 5g~B173.9B 17~ 1.04
g~B2.4~ 10879.32 4954.~B H 10209.07 E 6~.~ 59882X1.~ I~ 4.00
B236.L7 10960.6~ &g89.4~ N 1028S.67 ~ 698~2.~ 598~48,94 3g~ 4.00
G2gS-SS 11037.90 5024.~ ~ 1D3SB.26 g 698~4.23 5988295.39 ~70~ 4.00
sa, sa
s~o4/~oo
15769.47 48,85 J 63.45 8381,00 8340,00 11088.99
15800,00 &?,tS i 63,i6 G40L.33 836B.33
I
35833.SI 46.33 62.83 8424.18 8383,18 11L34~08
15890,36 46,33 6:2,83 8463,44 84.22,44
15900.00 46.$9 63.23 e470.08 8429,08 11L79.90
S04~.TZ ~ 1040~.3& ~ 69329151 ~95B310.£9 170~ 4.00
S057.~4 ~ 104~6.~9 ~ 69~22~.59 59983~0.92 170~ $.00
506~.07 ~ 104-40.33 ~ ~98293.14 5988332.59 I.~ t.OO
SOS?,84 ~ 104S~,91 H 698329.24 5988392.28 4~R 0.00
5091.DI ~ t0491.14 ~ 698335.3~ 5988355,6Q 48R 4.00
67,13 853T.04 8~96.04 ~1251.47
5122.13 ~ 105~8.55 g 6~8401.g9 595B366.40
4SR 4.00
16~00,~ ~2.22 ?~.~2 8600.27 8~9.2~ ~1327.32 514~.93 ~ %~30.e3 B 6S8~73.5~ S9~8418.~0 43~
16200,~ 55,20 ~.03 ~59.46 ~1B.46 21407.07 5174,28 ~ 10707.&4 ~ 698549.72 59~.19
~ ~/100 ~ 16754.8~ 72.9D
]~9.~ 73.31
1~9.77 73.31
~7.T3 8~L~5.4& :~L8~4.44 llBSO.20
89.04 8902.38 8~Sl.38 1/90l.~
~.33 8906.0a ~SS.0O ~9~,~
89.33 92..91.00 9I~0.D0 L2853,&l
89.33 9/91,00 9150.00 12853,~l
$212..19~ lOB'T3,32
5225.55 ~
5242.26 N 11~$7.89 ~ 6~038.08 5989524,53 34R ~.0~
S242-43~11209.a2 ~ 6~90S0.00 SgaSS~.O0 ~ 4.00
52~3,~E~160,~S S ?OOOOO.O0 59a~6q. O0
FEASIBILITY PLAN
NOT APPROVED FOR
EXECUTION
PLAN #~ ''~
.
"SHARED 'SER-vICEs ORILL'ING .......... J .... ~n'~
An ScMumDerger
· i i i i i il i i i i i i i iii i ii i ........
i i iii i
HB-5A (P6)
V£RTI'CAL SECTION VZE~
Section at: 80.63
TVI] Scale.: ! inc~ = 2400 fee[
Oep Scale.' ! inch = 2400 feet
Il) i7760 919i $2t~ ~3.31 Drawll. ' 05 Dec 1997
· ' . . Section erture . _
_i ! ii _ m ........... I I mill lllll lJlll m I mil II II I U I . _l I_
? .
........... ]Oep Scale.: I inch = 400 feet
~oo .... AK A'D~ IL _ AKA :DPC j~a~, _.,: 05 De~ i997
F ,IB1LITY
'~"~4 ~ TM J~60 919J I~853 73:
:
.
10400 iO~ lt}l{O0 ltO00 11~1~! .... .tl40g ii~u {ibDu icu~ ~. J ,~;~ ~,~ ,~ .... ~ : :.- ...... .. ..... "~"
~ct~on O~acture
"1
r-
C
C
C
_.
~0S~ .... - 13247 f~at at lzimth .63_
S .E, ' I inch = 1~0 feet ~'AN/~R'~LL A~-[)PC
.
......
~H~R'ED
i.S,ERVICES'. D~:~KT'N,G
i i ...... _ i iill i ii i ~ i _ i i i ~ i~
I_. ..... SHARED SERVZ'CEs DR'ZLL'ZNG
j, · · . ii , roLl II II ~ m I I I II I ......
PLAN VIEW
~OS~ .... · 13247 feel at ~i~u-th 66.63 ........
DECLINATION.: +~.~ {~
SC&E · ~ tnc~ = 400 Cee[
. ._ - ~ . . ' ,.,
o~m ...... ' ~ o~ ~7
~ ,- mm m
~ ~ ~o N ,.-
~ ~/,~ ~ ,~ ~. ~o,. ~ E: (ECl JTIC N
,~} ~ 4/~00 t~ ~ N ~ E ......... ~00
~ D 17~ ~4a l~60E . . . ., ~-~-- -. ~o0
.... ,, , , , ,
....... _ .... ,~e
~ ... .. . . : .- ~ .. ~: ~ =_ . . . . _ ~ . ,,, , .....
" ................... 4~0
.................. 4~Oa
.,
r'
........................ _ . . ..
--~-- ...... ~~ ~ ~ .... ~o~_...~ .... ~ .... ~ ..................
TONY KNOWLE$, GOVERNOt~
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
November 2~, 1997
Steve Shultz
Senior Drilling Engineer
ARCO Alaska, Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
West Beach WB-5A
ARCO Alaska, Inc.
Permit No. 97-225
Sur. Loc. 104'NSL, 3219'WEL, Sec. 25, T12N, R14E, UM
Btmnhole Loc. 426'NSL, 1285'WEL, Sec. 20, T12N, R15E, UM
Dear Mr. Shultz:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
Cammy Oechsli
Commissioner
BY ORDER OF THE COMMISSION
dlf/Enclosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA ~-c AND GAS CONSERVATION COh,~,lSSlON
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepenl [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. Plan RTE = 41' West Beach/Kuparuk
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 034627
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
104' NSL, 3219' WEL, SEC. 25, T12N, R14E West Beach
At top of productive interval 8. Well Number Number U-630610
206' NSL, 2011' WEL, SEC. 20, T12N, R15E WB-5A
Attotal depth i9. Approximate spud date Amount $200,000.00
426' NSL, 1285' WEL, SEC. 20, T12N, R15E 11/29/97
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 034628, 426'I No Close Approach 2560 17708 MD / 9191' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 1800' MD Maximum Hole Angle 72° Maximum surface 2600 psig, At total depth (TVD) 9000' / 3500 psig
18. Casing Program Specifications Setting Depth
Size Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 26# L-80 BTC-Mod 17669' 39' 39' 17708' 9191' 410 sx Class'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured 17041 feet Plugs (measured)
true vertical 9206 feet
Effective depth: measured 17041 feet Junk (measured)
true vertical 9206 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 80' 20" 260 sx Arcticset (Approx.) 121' 121'
Surface 6590' 9-5/8" 2970 sx PF 'E', 860 sx Class 'G' 6630' 4830'
Intermediate
Production
LinerRECEIVED
Perforation depth: measured N/A [~0V ~- 8 I~C~CJ~'
true vertical Alas~ Oil & Gas Oons. 6ommissi°n ORIGINAL
Anchorage
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Torn tvlaunder, $~4-55£1 Prepared By Name/Number: Kathy Campoamor, 5~4-$122
21.,Signedhereby certify that the ,~?going is~~ct~~~, to the best of my knowledge ,~ , ,~/,~//,
Steve Shultz Title Senior Drilling Engineer Date
Commission Use Only
I Aplroval~ Date [
Permit Number APl Number See cover letter
~;:>,~_~_..~_.. >r- 50-c~,~__'~-- ~---.~--<2"'//TM - O/ I& ~°~lc~'") for other requirements
Conditions of Approval: Samples Required [] Yes J~] No Mud Log Required · [] Yes [] No
Hydrogen Sulfide Measures [] Yes J~ No Directional Survey Required 'J~ Yes [] No
Required Working Pressure for BOPE []2M; []3M; ~5M; []10M; []15M
Other: Original Signed By by order of 1//c~c)/~1
Approved By Cammy 0echsli Commissioner the commission Date I ,')
Form 10-401 Rev. 12-01-85 Submit cate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] DeepenI [] Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska Inc. Plan RTE = 41' West Beach/Kuparuk
3. Address 6. Property Designation
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 034627 .-
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
104' NSL, 3219' WEL, SEC. 25, T12N, R14E West Beach
At top of productive interval 8. Well Number Number U-630610
206' NSL, 2011' WEL, SEC. 20, T12N, R15E WB-5A
At total depth 9. Approximate spud date Amount $200,000.00
426' NSL, 1285' WEL, SEC. 20, T12N, R15E 11/29/97
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 034628, 426'I No Close Approach 2560 17708 MD / 9191' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 1800' MD Maximum Hole Angle 72° Maximum surface 2600 psig, At total depth (TVD) 9000'/3500 psig
18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
8-1/2" 7" 26# L-80 BTC-Mod 17669' 39' 39' 17708' 9191' 410 sx Class 'G'
19. To be completed for Redrill, Re.entry, and Deepen Operations.
Present well condition summary
Total depth: measured 17041 feet Plugs (measured) ....
true vedical 9206 feet
Effective depth: measured 17041 feet Junk(measured)
true vertical 9206 feet
Casing Length Size Cemented MD TVD
Structural
Conductor 80' 20" 260 sx Arctic. set (Approx.) 121' 121'
Surface 6590' 9-5/8" 2970 sx PF 'E', 860 sx Class 'G' 6630' 4830'
Intermediate
Production i
Liner '
RECEIVED RECEIVED
Perforation depth: measured N/A 1~0~j ~ '[~cJl NOV
true vertical ~aS[~3 0it & Gas Cons. 0ornmiSsio~ Naska 0il & Gas Cons. Commission
Anchora~Je Anchorage
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Tom Maunder, 564-5521 Prepared By Name/Number: Kathy Campoamor, 564-5122
,21. I hereby certify that the f~?going is/tf~ct~~)~v~j~ to the best of my knowledge ~.__~,~//~,~~/,///'//~
Signed Steve Shultz Title Senior Drilling Engineer Date
Commission Use Only
Permit Number I APl Number Approval Date i See cover letter
/~/~-- ~ Z. ~~ 50- c3,~..-~-.. Z.. ~_..<2"/~ ;'-'<:~ /I for other requirements
Conditions of Approval: Samples Required [] Yes J;~,No Mud Log Required [] Yes ,[~'No
Hydrogen Sulfide Measures []Yes []No Directional Survey Required 'l~Yes [] No
Required Working Pressure for BOPE []2M; [] 3M; [] 5M; [] 10M; [] 15M
Other:
by order of
Approved By Commissioner the commission Date
I Well Name: I wB-$ a
Type of Well (producer or injector):
[Producer
ISurface Location: 104' FSL, 3219' FEL, SEC 25, T12N, R14E
Target Location: 206' FSL, 2011' FEL, SEC 20, T12N, R15E
Bottom Hole Location: 426' FSL, 1285' FWL, SEC 20, T12N, R15E ..
..
I AFE Number: [2D0047 I l Rig: ]POOL6 ]
I Estimated Start Date: I 11/29/97 I I Days to complete ! 10 I
I mI): 117vog' I l aw~: 19191' brt [ I RTE= [41.0 I
I Wen Design (conventional, slimhole, etc.): [ Ultra-Slimhole 7" Longstring [
Formation Markers:
EIVED
Formation Tops MD TVD
Base of Permafrost 1741 1741
SV1 (T3) 5783 4531
9 5/8" Casing Point 6630 4830 9-5/8" csg shoe below SV1 & above K-15
K15 (Ugnu) 7050 4985
West Sak 11727 6719
K- 12 12221 6907 ~ ~' t~
K-10 16082 8820 ,~ t.. 1~,
HRZ 16662 8865 t, tr~l,
Kupamk 16748 8896 ',~,v ~
Target 16912 8947 Nas/~ au ~. ,__ _
- '~ ~-~ ~ns. Co~rnission
Top MiluveacbdTD 17708 9191 7" casing shoe Ancho~ge
Casing/Tu ~ing Program:
Hole ~ize C~g/Tb~ Wt/Ft Grade Conn Length Top Btm
O.D. , MD/rVD MDFrVD
30" 20" 133# H40 BTC 80' 41/41' 121'/121'
12 1/4" 9 5/8" 40g L-80 , BTC-Mod 6590' 40/40' 6630'/4830'
8 1/2" 7" 26~ L-80 BTC-Mod 17669' 39/39' 17708'/9191'
6" (cont.) 4 1/2" 12.6g L-80 BTC-Mod
Tubing 4 1/2" 12.6# L-80 BTC-Mod 15692' 38'/38' 15730'/8330'
Mud Program:
ISurface Mud Properties: Spid
Density (ppg) ~unnel Vis Yield Point
Density (ppg) [ Plastic Vis Yield Point 10 sec gel 10 min gel
· pH Fluid Loss
Production Mud Propertiesi 3% KCL
Density (ppg) Plastic Vis Yield Point
10.5 8-15 15-25
18-1/2'' sidetrack--15400'-TD
10 sec gel ] 10 mia gel [ pH I HTI-IP
8-15 12-24 9.0-9.5 4-6cc
Revised- 11/26/97
Cement Data:
Casing First Stage: Second Stage: Comments
Sxs/Wt/Yield Sxs/Wt/Yield
NA
Casing/Liner Lead:Sxs/Wt/Yield Tail: Sxs/Wt/Yield Comments
7" none 410/15.8/1.15 Class "G". Volume based on
cement to 15230' with 50%
excess + 80' shoe.
Logging Program:
Open Hole Logs:
Cased Hole Logs:
NA
8 V2" LWD DIR/GR/RES KOP to TD. DEN/NEU possible top of
reservoir to TD depending on trips.
GR/CBT or USIT/Gyro (most probably through tubing after rig release).
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
are presently installed and capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Directional:
KOP (original):
Maximum Hole Angle:
1800' MD
68 °
Sidetrack KOP: 15400' MD
Max. Sidetrack Hole Angle 72 o
Close Approach Well:
NA
Revised- 11/26/97
Drilling and Completion Scope
1. Plug back original wellbore. Plugging program to be provided under separate cover.
2. Pick up kickoff assembly, TIH and polish plug to ~15,400 MD.
3. Sidetrack wellbore and drill 8-1/2" production hole to 17,708' MD.
4. Run and cement 7" L-80 casing.
5. Run 4-1/2" L-80 production tubing with 7" x 4-1/2" packer, 4-1/2" SSSV, and 4-1/2" x 1" GLMs.
6. Secure well, RDMO.
Drilling Hazards/Contingencies '
· The original reservoir pressure is 4450 psi at 9000' ss. The expected reservoir pressure is 3600 psi at
9095' TVD. RFT pressures will be available from the original wellbore. It is planned to maintain the
10.5 ppg MW presently in the well.
· No major instances of lost circulation problems have occurred on Pt Mac 2 wells.
Disposal
· Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection.
Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to
CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough.
..
TEM 11/26/97
Revised-II~26~97
RECEIVED
rvov
West Beach 5
Plug-back Plan
Introduction: This plan is being prepared to plug-back the original wellbore of West Beach 5
and sidetrack to a different bottomhole location. The new well will be West Beach 5a. WB-5
has been drilled to 17041' MD. TD is in the Miluveach shale. The wellbore was logged with 4
phase LWD and DPC RFT/Sonic/GR. When the logging has been completed, the open hole
will be plugged back to -15100'.
As preparations are made to plug, notify AOGCC inspector so he may be present to witness if
desired.
Present Wellbore Condition: 8-1/2" hole has been drilled from the 9-5/8' casing shoe @
6630' to TD of 17041'. The mud weight is presently 10.5 ppg. The wellbore has been stable
and no fluid losses have been experienced. The 8-1/2" hole is mostly at -70° with the angle
being reduced to -34° at TD. The angle at the intended kick-off point is 63.4°.
Procedure:
1. When tripping out of hole with logs, stand HWDP out of way if possible, otherwise LD.
.
PU 1200' 3-1/2" tubing with muleshoed end. Include a Baker pressure operated circulating
sub in the DP above the DP x tubing XO. The circulating sub should be set to open at 3500
psi differential. Inspect the XO and assure that there is not a'sharp ID reduction that could
potentially hang up a DP wiper ball. Also assure that such ball will not hang up in the
circulating sub. It is planned to pump a wiper ball to wipe the pipe after each plug.
3. TIH to bottom and spot 18.0 ppg 'mud from TD to 16900. Based on 50% XS over gage hole,
the required volume is 15 bbls.
4. Pull and place tubing tail - 50' below the base of the Kuparuk sand -16900'.
5. Spot a balanced cement plug from - 50' below the Kuparuk to 16000' (16900' - 16000').
Based on 20% XS over gage hole-and .99 yield, the cement requirement is 360 sx.
6. After the water is in the pipe, drop a DP wiper ball and displace the plug to balance.
Displace a little short so the pipe will pull dry.
7. POOH to place EOT at -16000'.
8. Begin circulating and pump the ball out of the tubing. Circulate the well and prepare for
further plugging.
9. Spot. a balan(~ed cement plug from -16000' to 15100'. Based on 50% XS over gage hole
and .99 yield, the cement requirement is 540 sx.
11. Drop a wiper ball behind the water and displace as before.
12. POOH to place EOT @ 15000'.
TEM-11/26/97 Page I of 2 plugback3.doc
13. Begin cirCulating an8 pump the bait out of the tubing. CirCulate the well and Pregare to
7" casing will be run.
poOH.
CON'[tNGENC¥: A~ter cemen2ng,
RECEIVED
NOV
Alaska 01t &
Anchorage
page 2. o4 2.
ptugbaC~r,3-d°C
Anadrill Schlumberger
Alaska Distr~ct i'
1111 East 80th Avenue
Anchorage, Al{ 99518
(907) 349-¢511 Fax 344-2160
DIRECTIONAL WELL PLAR for SKARED SERVICES DRILLING
P/eld ........ : West Beach
Cc~putation..: Minimum Curvature
Units ........ : FEET
Surface L~t..: 70.35835052 N
Surface bong.: 148.47312922 ~
Legal Description
Surface ...... : 104 FSL 3219 PEL S25 TI2N R14E UM
T/e-in Survey: 5003 FSL 3239 FEL S29 T12N R15~ t/M
Tarc3et ....... : 206 FSL 20ll FEL S20 T12N RLSET_D4
BKL .......... : ~2~ FSL 12~5 FE~ S2D ~12N RL5E UM
LOCATIONS - A/2%SKA Zoae: 4
X-Coord Y-Cc)ord
687975.92 5983003.20
697948.~0 598816~.27
599161.00 5988676.00
690880.00 59BB915.00
PRO~0SEO WE~L PROPILE
{{~mmmmmm~mmmmmmmmmm
S~A~ I0~
IDE~TIPICATION
T/E-IN SURVEY
KOP CURVE 3/I00
mmumlumm mmmamm =m===~mmm ms~smmmnmm~;=~
M]~%StrRED INCL~ DIRECT/ON VERTiCAL-DEPTHS
DEPTH ANGLE AZIMUTH TV~ SUB-SEA
15363.70 63.6~ 66.67 8159.53 8118.53
15400.00 6~.~4 66.31 8175.70 8134.70
15500.00 60.~4 66.19 822~.~3 ~181.73
15600.00 57.45 66-06 ~274.31 8233.31
15700.00 5~.45 ~5.~3 $3~0.31 8289.31
Prepared ..... : 26 Nov 1997
vet= sect az.: 70.16
KB elevation.: ¢1.00 ft
Nasnetic DcLn: ,28.459 [E)
Scale Factor.: 0.99994014
Convergence..: +1.43806554
SECT/ON
DEPART W~LI/~HAD X Y
11164.$7 490S.45 N 1~99.05 E 697948.10 S988~65.27
11196.99 4918.~2 N [~12S.S5 E 697977.56 5988173.98
11285.03 4953.96 N 10209.6[ E 698057.40 5988211.S3
11370.47 4988.63 N 10287.94 E 698134.83 59882&8.16
11453.10
ANADRILL AKA-DPC
APPROVED
FOR. P£RMITTING
ONLY
COORDINATES-FROM ALASKA Zone 4 TOOL
FACE
mm~m~
/201 <TIE
~781 1.04
1781 ~ .00
1781 3.00
5022.33 N 10363.62 E 698209.64 5988283.74 178I~ 3.00
BASE ODL~VILLE 1578(.60 51,91 65.80 8381.00 8346.00 11520.62 5050.02 N 10425o{1 E 698270.71 5988312.97 1751 3.00
~5B00.00 51.45 65.78 8390.5~ 8349.55 1[$32.6~ 5054.97 N 10436.44 E 698281.62 598B318.20 1751 3.00
END 3/100 CURVE 15846.84 50.05 65.71 8420.19 B379.~9 11568:83 5069.87 N 10469.51 E 698314.29 5988333.93 HS 3.00
Cmvs 3/180 I6045.46 50.05 65.71 5547,74 8506.74 11720.63 5132.5[ N 10608.28 E 698451.44 5988400.02 LSR 0.0O
16100.00 51.60 66.56 8582.19 8541.19 ~1762.80 5149.68 N 10646.91 E 698489.63
16200.00 54.~7 67.~8 §6{2.3~ 8601~32 L18~2.56 5180.9~ N L0~20.41 E 698562.31 5988451.30 17R 3.00
WB-SA (P4) 26 Nov 1997 Page 2
STATION
IDENTIFICATION
END 3/100 CURVE
KUPARUK
TARGET
~ILUVaACH
TD
MEASURED
DEPTH
16300-00
16400.80
16500.00
16553-?7
16600.00
16662.11
16V00.00
16748.8&
L6S00.00
16812.09
16912.09
16912.09
17708.13
17708.13
I7708.13
mmmmmm
IRCLN
57.34
60.22
63.[~
64.66
66-00
6';. 80
68.9a
70.31
71.80
92.15
~2.15
92.15
72.15
92.15
72.15
YROPOSEO ~ELL PROFIL~
mmmmmmmmm ~mmmmmu~smmmmmmm
DIRECTION VERTICAL-DEPTHS
AZIMUTK TVD SUB-SEA
68.52 8698.38 8657.38
69.50 8750.21 8709.2]
70.43 8797.67 8756.67
70.91 8821.34
71.31 8840.63 8799.63
SECTION
DEPART
11925.~0
12098.79
L2~89.07
C00RD[NATES-FROM ABASKA Zoae 4 TOOL DL/
WELLHEAD X Y FACE 100
698638.28 5988484.21 16R 3.00
698717.31 5955516.82 16R 3.00
698799.22 59885~9.02 16R 3.00
5288,72 N 1~005.26 E 6988&&.36 5988566.~4 15R
5302.32 N 1~84~.01 E 698883.75 5988580.73 ~5R 3.00
5211.99 N 10797.18
5242.60 N L08??.02
5272.74 N 10959.71
71.$3 8665.00 8824.00
72.15 6898.98 8837.98 52281.38
~2.55 8896.00 8855.00 12327.~3
72.96 S912.61 8871.61 12375.46
73.05 89[6.35 887S.35 12386.95
5320.38 N 11099.91
5331.27 N 11132.70
~345.15 N 11176.~2
5359.~9 N 11222.53
5362.86 N 11233.53
698937.~? $958600.1~
698978.68 S955611.87
6990~3.94 5988626.84
699059.77 59886~2.34
699070.6~ 5988645.98
73.05 8947.00
73.05 89~?.00
73.05 9191.00
73.05 91~1,00
73-05 9191.00
8906.00 12482.81
8906-00 12482.01
9150.00 13238.77
9150.08 13238.77
9150.00 13238.77
5390.60 N 1132~.$$
5390.60 N 13~26.58
5611.49 N 120%9.39
5611.49 N ~20&9.39
5611.49 N 120%9.39
699161-00 5988676.00
699161-00 5988676.00
699880.00 59889L5.00
699880.00 5988915.00
699880.00 5986915.00
1SA 3.00
1ER 3.00
1SA 3.00
15R 3.00
HS 3.00
H$ 0. O0
O.O0
0. O0
a ,0o
o ,0o
ANADRILL AKA-DPC
A?PROVED
i)ERN ,tTTING
ONL'¥
(Anadrill {c) 97 WBSAP¢ 3.2b.5 2:52 L~ P)
(
Anadr i'll Schlumberger
il ml _ ii i ·
WB-SA (P4)
PLAN VIEW
CLOSURE 23292 feel a[ Azimuth 65.03
SHARED
SERVZCES
DR ? i'_'"i" ING ....
SCALE .......: I inch : ~500 feet
DRAWN ' 26 NDV ~997 A ~ ~.C ¥ [~ ~.~ - -
, ........ ~0~
~rker Identification · N/S E/~ ~'- ~ ~' --
Al -ZN SUBVEY ~5364 4905 N
C) ENO 3/~00 CBRVE ~5B47 5070" tO4~O E ----
8) CURVE 3/tO0 ~80,45 5~33 N
E) END 3/~OO CURVE ]6~ 5289 ~ 11005 E "
F) ~f ~*~~ ~6912 539~ ~ ~5 E ar~et~nt)
6) 7° L~ Pf <11> ~7708 56~t N ~2049 E
,,,
H) fO ~7708 56}~ N ~2~49 E
.............
..... ~¢¢~ ....
............... , ,~/~ .-.~.... ,, ,,... , ....
.... ..... . ..,. ....
......
...........
,'.~c. ~ ~-~ J~:~:~ ~o'~: ~.~.~:~ &,. ~-~ 'i~'~: ~,~. ~-'G'G~ ~-, ~ .:2..J.- .;.:;.2 222 .... ~' ;~;2'1 ~;~'2 ' *' '.'
<- ~EST' EASI ->
~~11 S£h]u~berg~r SHARED SERVZCES BRTLLIN6
Ill I I I
,, ......
NB-SA (P4)
PLAN VIEW
CLOSURE .... ' 132g2 feet at Az&auth 65.02
DECLINATION.- +2B,459 (E) , 6400
'-
SCALE.' ~ inch = 400 feet 1 ckNADRLL A {A-DPC
' "'" ~t' ' ~ .... 6200
............ ~ ~c~. ~j R~di FT~¢,LG j
~arker /dentificatSon MD N/S E/H ' "'' '' ": ....... 6000
A) rlE-IU SURV[Y t536~ 4905 N 10099 E I
8) KOP CffiVE 3/~00 15400 4918 N 10129 E '
rC) END 3/~ao CURVE 1~47 5070 N 10470 E
'O) CURVE 3/100 i~45 5i33 N i0608 E ............................. ?._..~2J ..... L ............ 5800
E) END 3/~OO CURVE 16554 5289 N 11005 E
F) TA~ET ~x~,~ IBgI2 539~ N 11325 E
G) 7' LNR PT <11> 1770B 561J N 1~49 E 8
H) TD 17705 5511 N 12049 E -- ~ ~00
-~ 5~bo
....
,
......
- ...... 4800
~ ~ ......... 4~00
.............
~.~. ........... ~ .... ~ ....... ~.. ~ ........ ~ ....... &~ ....... &~ ..... ~ ..... .. ~ ..... ~a~ ..... ~.~ ~... ...... ~ .... &~ ........ .~ ~ .................
EASI ->
IAn~r~]t 7 1~5,4P4 3.2b.05 4:38 PN P) .............................
¢'HARED
SERVZC'Es
i Illll I
I
DRI'L'LIN8
! ANADRILL. ,,~,~A- L),- ('.
i · ii111 . . _
/]nadri ] ] Sc~ ]umbengen
in
.
il
WB-SA (P4)
VERTICAL SECTION VIE~
Section at: 70.16
, = 2400 feet
) ........k ' ..... = .................................. Marken Identification ~D BKB SEC]~ INgt
~ A) HE-ZN SURVEY 15354 ~60 ~65 63.i
B) XOP C~BVE 3/~00 15400 ~76 H~97 63.,
C) END 3/~00 EURVE 15B47 B420 t1569 50.[
]-- ~1 : .... D) EURVE 3/$00 ~6645 8548 t172~ 50.[
E) ENB 3/~00 C~VE ~5554 BB2~ .t~47 64.i
~ F) ]&R6E3 ~,~~ ~6912 8947 t~482 72.~
) .... % .......... ~) 7' LNR PT <1]> ~77~8 9191 13~9 72.~
H) lO ~7708 9191 ]3~39 72.~
~ .............
,
.............................. 2:-22-2-22--.
'~L~'r~' ~J~J' ~ .........................
.........
..
........
:
.........
.......
,,,,=, .... I .......
- I
5
15
15
15
Section Departure
imm .... _ .......
I~ori]l Ic)9~ ~ 3~.5 z~ m PI
..... SHARED" SERVICES BRTLLTN6
i i i i ii ii i
Anadr.i.l] Sch]umberger
i ._ i · i
iiii _ ! iii
NB-5A (P4)
VERTICAL SECTION VIEW
_ .
Section at: 70.i6
....................................................... TVD Scale.' ~ inch = 400 feet
I "-'"" ~"C. ',
ANAE P, ILL ""':"'":';"' ' Oep Scale.' J inch = 400 feet
A!"*:',o~"~/t',,-',''~ ', Drawn '26 Nov ~997
I · III
.....
' Marker IdentlficattDn MD BKB SECIN INCL
~.l ~,.~l ~q~ ~ A) TIE-IN SURVEY 15364 8t§O 1~85
F1..;.~..~~. ...... .......... _. B) KOP CURVE 3/~00 i5400 8176 iii97 63.~
.............. · --- C) END 3/~00 CURVE ~5847 8420 i~569 50.(
-, ....... ' ......... -- D) CURVE 3/JOO i6045 8548 It~2J 50.(
'~, E) END 3/100 CUItVE ~8554 882! ~2147 64.6
'-, F) IARGEI ~**~*)~ ~69J2 8947 ~24B2 72.
-...... G) 7" L~ PT <l I> ~7708 gig! !3239 72.
''-,, H) lO ~7708 g~gl J3239 72.
%-,,
C
.... / ........... ~ . .... ' .......
....
............. ) m
............... S..e...c....t ion Departure
.... iiiml
I Well Name:
Type of Well (producer or injector):
I Producer
Surface Location:
Target Location:
Bottom Hole Location:
104' FSL, 3219' FEL, SEC 25, T12N, R14E
206' FSL, 2011' FEL, SEC 20, T12N, R15E
426' FSL, 1285' FWL, SEC 20, T12N, R15E
I AFE Number: 12D0047
I Estimated Start Date: [ 11/29/97
I Rig: I POOL 6 I
11° I
I Days to complete
IUD: I17708' I I TVD: 19191'brt I [RTE: 141.0 I
Well Design (conventional, slimhole, etc.):
Formation Markers:
I Ultra-Slimhole 7" Longstring
Formation Tops MD TVD
Base of Permafrost 1741 1741
SV1 (T3) 5783 4531
9 5/8" Casing Point 6630 4830 9-5/8" csg shoe below SV1 & above K-15
K15 (Ugnu) 7050 4985
West Sak 11727 6719
K-12 12221 6907
K-10 16082 8820
HRZ 16662 8865
Kuparuk 16748 8896
Target 16912 8947
Top Miluveach/TD 17708 9191 7" casing shoe
Casing/Tu'~ing Program:
Hole ~ize C~g/Tb~ Wt/Ft Grade Conn Length Top Btm
O.D. MD/TVD MDfYVD
30" 20" 133# H40 BTC 80' 41/41' 121 '/121'
12 1/4" 9 5/8" 40# L-80 BTC-Mod 6590' 40/40' 6630¥4830'
8 1/2" 7" 26# L-80 BTC-Mod 17669' 39/39' 17708'/9191'
6" (cont.) 4 1/2" 12.6# L-80 BTC-Mod
Tubing 4 1/2" 12.6# L-80 BTC-Mod 15692' 38'/38'. 15730'/8330'
Mud Program:
Surface Mud Properties: Spid
Density (ppg) ~unnel Vis Yield Point
I
INA
I10 sec gel ]10 min gel
pH
Fluid Loss
Production Mud Properties: LSND ]NA
Density (ppg)
Plastic Vis
Yield Point 10 min gel
10 sec gel
Production Mud Properties: 3 % KCL
[ 8-1/2" sidetrack--15400'-TD
pH
Fluid Loss
Density (ppg)
10.5
Plastic Vis Yield Point
8-15 15-25
I 10 sec gel
8-15
10 min gel I
12-24
pH
9.0-9.5
HTHP
4-6cc
Revised-Il~26~97
Cement Data:
Casing First Stage: Second Stage: Comments
Sxs/Wt/Yield Sxs/Wt/Yield
NA
Casing/Liner Lead:Sxs/Wt/Yield Tail: Sxs/Wt/Yield Comments
7" none 410/15.8/1.15 Class "G". Volume based on
cement to 15230' with 50%
excess + 80' shoe.
Logging Program:
I Open Hole Logs:
Cased Hole Logs:
NA
8 V2" LWD DIR/GR/RES KOP to TD. DEN/NEU possible top of
reservoir to TD depending on trips.
GR/CBT or USIT/Gyro (most probably through tubing after rig release).
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
are presently installed and capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Directional:
KOP (original):
Maximum Hole Angle:
Sidetrack KOP:
Max. Sidetrack Hole Angle
Close Approach Well:
1800' MD
68 °
15400'MD
72 o
NA
Revised-Ill26~97
Drilling and Completion Scope
1.
2.
3.
4.
5.
6.
Plug back original wellbore. Plugging program to be provided under separate cover.
Pick up kickoff assembly, TIH and polish plug to ~ 15,400 MD.
Sidetrack wellbore and drill 8-1/2" production hole to 17,708' MD.
Run and cement 7" L-80 casing.
Run 4-1/2" L-80 production tubing with 7" x 4-1/2" packer, 4-1/2" SSSV, and 4-1/2" x 1" GLMs.
Secure well, RDMO.
Drilling Hazards/Contingencies
· The original reservoir pressure is 4450 psi at 9000' ss. The expected reservoir pressure is 3600 psi at
9095' TVD. RFT pressures will be available from the original wellbore. It is planned to maintain the
10.5 ppg MW presently in the well.
° No major instances of lost circulation problems have occurred on Pt Mac 2 wells.
Disposal
· Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to CC-2A for injection.
Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to
CC-2A for disposal, except any metal cuttings which will be sent to the North Slope Borough.
TEM 11/26/97
Revised- 11/26/97
West Beach 5
Plug-back Plan
Introduction: This plan is being prepared to plug-back the original wellbore of West Beach 5
and sidetrack to a different bottomhole location. The new well will be West Beach 5a. WB-5
has been drilled to 17041' MD. TD is in the Miluveach shale. The wellbore was logged with 4
phase LWD and DPC RFT/Sonic/GR. When the logging has been completed, the open hole
will be plugged back to -15100'.
As preparations are made to plug, notify AOGCC inspector so he may be present to witness if
desired.
Present Wellbore Condition: 8-1/2" hole has been drilled from the 9-5/8" casing shoe @
6630' to TD of 17041'. The mud weight is presently 10.5 ppg. The wellbore has been stable
and no fluid losses have been experienced. The 8-1/2" hole is mostly at -70° with the angle
being reduced to -34° at TD. The angle at the intended kick-off point is 63.4°.
Procedure:
1. When tripping out of hole with logs, stand HWDP out of way if possible, otherwise LD.
.
PU 1200' 3-1/2" tubing with muleshoed end. Include a Baker pressure operated circulating
sub in the DP above the DP x tubing XO. The circulating sub should be set to open at 3500
psi differential. Inspect the XO and assure that there is not a sharp ID reduction that could
potentially hang up a DP wiper ball. Also assure that such ball will not hang up in the
circulating sub. It is planned to pump a wiper ball to wipe the pipe after each plug.
3. TIH to bottom and spot 18.0 ppg mud from TD to 16900. Based on 50% XS over gage hole,
the required volume is 15 bbls.
4. Pull and place tubing tail - 50' below the base of the Kuparuk sand -16900'.
5. Spot a balanced cement plug from - 50' below the Kuparuk to 16000' (16900' - 16000').
Based on 20% XS over gage hole and .99 yield, the cement requirement is 360 sx.
6. After the water is in the pipe, drop a DP wiper ball and displace the plug to balance.
Displace a little short so the pipe will pull dry.
7. POOH to place EOT at -16000'.
8. Begin circulating and pump the ball out of the tubing. Circulate the well and prepare for
further plugging.
9. Spot a balanced cement plug from -16000' to 15100'. Based on 50% XS over gage hole
and .99 yield, the cement requirement is 540 sx.
11. Drop a wiper ball behind the water and displace as before.
12. POOH to place EOT @ 15000'.
TEM-11/26/97 Page 1 of 2 plugback3.doc
13. Begin circulating and pump the ball out of the tubing. Circulate the well and prepare to
POOH.
CONTINGENCY: After cementing, if hole conditions deteriorate 7" casing will be run.
TEM-11/26/97 Page 2 of 2 plugback3.doc
Anadrill Schlumberser
Alaska District
1111 East 80th Avenue
/~nchorage, Al< 99518
(987) 349-4511 FB3{ 344-2]60
DZRECTZORAL NELL Pk~dq for SHARED SERVICES DRILLING
Well .........
Field ........ : West Beach
Cc~mputation..: Minimum Curvature
U~S ........ : FEET
Surface bat..: 30.35835052
Surface Long.: 148.47312922
L~al Description
Surface ...... : 104 FSL 3219 FEL
T/e-in Survey: 5003 FSL 3239 FEL
Target ....... ; 206 ~SL 2011 FEL
BI{L .......... : 426 FSL 1285 ~
LOCATIO~ - A/~kSKA Zone: 4
X-Coord Y-Coord
S25 T12N R~4E UM 687975.92 5983003,20
S29 TI2N R15~I3M 697948.10 598B160.27
S20 T/2N RiSE UM 699161.00 5988676.00
S20 ~12N RISE UM 699880.00 5988915.00
PROPOSED WELL PROFILE
STATION
IDENTIFICATION
KOP CURVS 3/I00
MEAS~D INCLI{ DIRECT/ON VERTICAL-DSPTI{S S~CT/ON
DEPTH AiqGLE AZIMUTH TV~ SUB-SEA DEPART
15363.70 63.63 66.67 8159.53 81~5.53 11164.57
15400.00 63.(4 66,3[ 8175.70 8134.70 11196.99
15500.0~ 60.44 66,19 822~.73 S181.73 11285.03
15600.00 57,45 66.06 8274.31 S~33,31 11370.47
15700.00 54,45 65-93 $330.31 8289.3t 11453-k0
Prepared ..... : ~6 Roy ~997
verC sect az.: 70.16
KB elevation.: (l.00 ~t
~a~setic Oc~n: +28.459
Scale Factor.: 0.9999401~
Convergence..: +1.43806554
ANADRILL AKA-DPC
APPROVED
FOR. PERMITTING
ONLY
'. ~ ' -"z'~'~ ~ .-T ~, :__~
COORDZI{ATES-FI{OM ~ Zone 4 TOOL DL/
~L~ X Y FA~ Z 00
49B5.45 N Z0099.05 E 69794B.10 5988160.27 120L <TIE
4918.42 N ZO128.S5 E 697977,56 5988173.98 178L 1.04
4953.96 N 10209.6[ E 698057.40 5988211.53 178L 3.00
4988.63 N 102S7.94 E 698134.83 5988248,16 178L 3.00
5022.33 N 10363-62 E 698209,64 5988283,74 178L 3.08
:I>
Z
/>
~g
H
BASE O36EVILLE 157B(,60 51,91 65.80 S381.00 8340.00 11520.62 5050.02 ~ 10425.41 E 698270.7t 59B8312.97 175L 3.00
15800,00 51,45 65.78 8390,55 8349.55 11532.67 5054.97 ~ 10436.~4 E 698281.63 5988315.20 175L 3.00
END 3/100 CT/EVE 15846,84 50,05 65.71 8420,19 8379.19 11568~83 5069.s7 N 10469.51 E 698314.29 5988333.93 HS 3.00
CUR%q] 3/100 16045,~6 50.05 65.?1 854~,74 8506.74 11720.63 5132-5~ N 10688.28 E 698451.4~ 5988400.02 LSR 0.00
16100.00 51.60 66.36 8582,19 8541.19 11762.80 5149.68 N 10646,91 E 698489.63 5985418.~6' 18R ].00
16200.00 54.{7 67.{8 8642.32 8601.32 118~2,56 5180.99 N 10720.41 E 698562.31 5988451.30 17R 3.00
WB-~A (P4) 26 Nov 1997 Page 2
STATION
IDeNTIfICATION
---===
Em] 3/~o0 CURVE
KUDARUK
===
~]EASURED rNCLN
DEPTH AN~LE
16300.00 57.34
16400.00 60.22
16500.00 63.L1
16553.77 64-66
16600-00 66-00
16662.11 6?.80
16700.00 68.90
16748.84 70.31
16800.00 71.80
16812.09 72.15
DIRECTION VERTICAL-DE~TMS
AZIMUTH TaD SUB-SEA
SECTION
DEP~LRT
68.52 8698.35 8657.3g 11925~30
69.50 8750.21 8709.21 12010.79
g0.43 8797,67 8756.67 12098.?9
70.91 8821.34 8780.34 121{7.07
71.31 8840-63 8799.63 12189,07
COORD[NATES-FROM ALASKA Zone 4 TOOL DL/
WELSKF. AD X Y FACE
5211.99 N 10797.18 E 698638.28 5988484.21 16R 3.00
5242.60 N ~8877.02 E 698717.32 5958516,82 16R 3.00
5272.74 N 1895~.71 E 698799.22 59885~9.02 i~R 3.0~
5~88.72 N 11005.26 E 698844.36 5988566.[4 15R 3.00
5302.32 N 11045.0L E 698883.75 5988580.73 15R 3.00
71,$3 8565.00 8824.00 122~6.18
72.15 ~878.98 8837.98 12281.38
72.55 S896.00 8855.00 12327.I3
72.96 89~2.61 8871.61 12375.46
73.05 89~6.35 8875.35 12386.95
5320.38 ~ 11099.91
5331.27 ~ 11132.7~
S345.15 ~ 11176.32
5359.{9 N [1222.53
5362.86 N 11233,53
698937.47 5988600.14
69897~.68 5985611.87
699013.94 5988626.84
699059.77 5988642.34
699070.6S 59886~5.98
55~ 3.00
1SR 3.00
15R 3.00
15R 3.00
85 3.00
TARGET
TOP RESERVOIR
7. ~,~PT <Il>
~ILLT~C~
TD
169~2.09 72.15
16952.09 72.18
17708.13 72,15
17708.13 72,15
I77~8.13 72.15
73.05 8947.00 8906.00 12482.01
73.05 89~7.00 8906.00 12482.01
73.05 9191,00 9150.00 13238.77
73.05 9191.00 9150.00 13238.77
73.05 9191.00 9150.08 13238.77
5390.60 N 1132~,58
5390.60 ~ 11324.58
5611.49 M 12049.39
5611,49 N 120~9.39
5611.49 N 12~%9.39
699161.80 5999676.00
699161.00 5~98676.00
699880.00 5988915.00
619880.00 5988915.00
69185~.00 5986915.00
~S
ANADR ILL AKA,-DPC
A?-PROVI D
FOP, PERMITTING
PLAN ..........
0.00
0.00
0. O0
0.00
0.00
Z
H
-U
]>
m
(Anadrill {c)97 WBSAP4 3,2b.5 2:52 P~ P)
~nadrjl! Schlumberger
iiii iiii i iii1~ ii i
B-5A (P4)
PLAN VIEW
_ iilll ii ii ill i
CLOSURE .... ' ~3292 feet at Aziau~h 65.03
DECLINATION - +28.459 (E)
SCALE ' ~ inch = 400 fP_et
DRAWN ' 26 Nov 1997
· i i i .......
~arker Identification MD N/S E/~f
A) fIE-IN SURVEY ~5364 4905 N tOOg9 E
B) KOP C~VE 3/]00 15400 4918 N 10129 E
C) END 3/J00 gURVE t58J7 5870 N 10470 E
jCURVE 3/100 16045 5133N 10608 E
~I END 3/JOO CUR~/E 16554 5289N 1t005 E
F) TARGET x~)~)~ 1§912 53§:1 N 11325 E
G) 7" LNR @f <l I> 1770B 561J N ~20~9 E
H) TD 1770B 5611 N 12049 E
EAS:[ ->
SH-%RED
....
SERVICES--DRILLING '"
- - ' ..................... iii
· ..,, .,.
iii i i
Z
~-)
ITl
SHARED S'EFtVZ6ES
DRiELiN '
[ ANADRILL .,~,¢,A-b,,' (.. i
! ii1~1
WB-5
VERTICAL SECTION VIEW
. .
SectiDn at: 70.
~ 'IF' ' ~ ~.. ~, TVD Scale,: ~1 inch: 2400 feet
· ~'q~ioep Scale,: 1 tncB = 8400 feet
-- ': 0~.} .... t.v' . IDra~n....... : 26 Nov 1997
_ ~ i', ................. ~ ................................. '"-"" .......
................ Narker ldentJf&gat~on ~0 BKB SECT~ INCL
....
~ 0) CURVE 3/~00 ~6645 8548 1172] 50,0
E) END 3/t00 g~VE ~6554 8621 12~47 64,E
~ F) ]~R6EI ~~ ]6912 8947 1~482 72,1
~ G) 7' LNR PT <1]> ~7708 9191 ~3239 72,t
H) ID ~7708 9191 ]3~39 72,1
.. ~ , ,
...... ~ ..
-~ ~ ......
,,
.... ~~ ....
~_ r-., .......
.... _ .
4
iiiii ......
I/u~dr'i]l Ic)9'~ ~BSAPt 3.2~,5 2:52. PN PI
Z
H
.-~
Ir]
i Il . _ . m. i _ i
'"SHARE[}" SERVICES DRILLING
Anadrj2] Schlumberger
......... Il Il I I .. I I I II
IIII -- II I I
NB-SA (P4)
VERTICAL SECTION VIEW
Sectio~ at: 70.16
i" L ' ............... 't-::":':"-"-"~"' . :,JTVD Scale.: ~ inch = 400 feet
'ANAE~RILL ........... ' .... ' '"'(' : IOeP Sca]e,: ~ inch = 400 feet
........ , .;~,(~t~'.. ~ ~rawn ..... : ~6 ~ov ~997
~.~"~'... -~ ~..,~
I
,. ~E~' -,
~ . : ~ -~,~' .... . .... ,-.. , .....
... ~.¢~., ~ ~ ~ ~aCkep Identification ~B BKB SECTN INBL~
~. ~ ¢~ // ~~ A) TIE-IN SURVEY ~5364 8180 ~85 63.6:
: B) KOP CURVE 3/~00 ~540a 8t76 ~97 63.4,
.... ¢~'¢"~ ':": .... ......... .. . .. . -.-~ c) END 3/~00 CURVE 15847 8420 ~569 50.0~
.
,,' ' ........................ '" - B) CURVE 3/~00 ~6045 8548 tt722 50.0~
"-~ E) END 3/100 C~VE 16554 882~ 12~47 64.61
'-,, F) TARGET ~~*~ t69~2 8947 12482 72.1~
",,_, .. . ~ . 6) 7" L~ PT <11> t7708 g~gt ~3239 72.1~
-,, H) lB t7708 B~Bt ~323g 72.t!
. ....... ,..
~.,
~:<~~'~r .... ~ ........ ~ ................. ~ .................. 2~ ~ .....
................ ~ ......................................................... ~ ..... 1 - ~ -
r ~y~ fist
) ,
............................... ~ ...... ,~ ...... · ~ ....... ~ .... ~ ..... ~ ...... ~.~
Section Oepa~tuPe
I ........................... i iiiii , llllllll . .-
II
I~a~',]L Ic)9'T ~IBS~,~ 3,~3,~5 3: ~i ~ PI
~>
Z
rq
t '- Anadr]:']] Schlumberger I "' SHARED SERVTCES DR_ii'_'"i' ZNG ........
_
. iii i i ii i ii ii ii iiii
WB-SA (P4)
PLAN VIEW
i ii ill
6LOSURE ' ~3292 fee[
at Azimuth 65.03
NAT]ON.' +aB. 459 (E} ....... ---~
' ] inch = ]500 feet ANAl>RILL AKA-D~C J
.
....................
-]N SU~WY ~5364 4905" 10099 E
C~VE 3/~00 15400 49~8N 10129 E
3/~00 CURVE ~5B47 ~070" iO470E I
¢E 3/i00 ~6a45 5~33N iaB08E
3/~00 CURVE ~6~ 52Bg N 11005 E
~f ~*~~ ~6912 5391 ~ 11325 E
-~ PI <11> ~7708 56il M 12049 E
,
~7708 5611 ~ 12049 E ,, ~
....... ~
..... ..........
........ .
a ...: = = = . . _
-..
....
SCALE
DRAWN
~rker
A] TIE-IN
B] KOP
C) END
O) CURVE
E) ENB
F) TARGET
'G) 7'0`
H) fO
Z
H
F-
· WELL PERMIT CHECKLIST COMPANY /,,.'-~_...~ WELL NAME /'.z.~_¢¢ ,/~0~ ,~",~
FIELD&POOL ~¢:, ~/'",d5 ..,/~ ~~' INIT CLASS
\J
PROGRAM: exp [] dev [] redrll/l~ serv [] wellbore seg ~: ann. disposal para req [3
UNIT# ////~, ¢',~ ON/OFF SHORE
--
ADMINISTRATION
___R DATE,
.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Permit fee attached .......................
Lease number appropriate ...................
Unique well name and number ..................
Well located in a defined pool ..................
Well located proper distance from drilling unit boundary ....
Well located proper distance from other wells ..........
Sufficient acreage available in drilling unit ............
If deviated, is wellbore plat included ...............
Operator only affected party ...................
Operator has appropriate bond in force .............
Permit can be issued without conservation order ........
Permit can be issued without administrative approval ......
Can permit be approved before 15-day wait ........... ~,
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Y N
ENGINEERING
APPR D,C, TE
114' cMTC°nduct°rvol string provided ................... surf
15. Surface casing protects all known USDWs ...........
16. CMT vol adequate to circulate on conductor & surf csg .....
f
7. adequate to tie-in long string to csg ........ ~'~"7~
18. CMT will cover all known productive horizons ..........
19. Casing designs adequate for C, T, B & permafrost ....... k~N
20. Adequate tankage or reserve pit .................
21. If a re-drill, has a 10-403 for abandonment been approved... (~N (~¢-o ce ~,"e
22. Adequate wellbore separation proposed .............
23. If diverter required, does it meet regulations ..........
24. Drilling fluid program schematic & equip list adequate ..... ~ N
25. DOPEs, do they meet regulation ................ ~ N
26. DOPE press rating appropriate; test to ,5'"-oo'O psig. Y N
27. Choke manifold complies w/APl RP-53 (May 84) ........ ~ N
28. Work will occur without operation shutdown ........... ~b N
29. Is presence of H2S gas probable ................. (~ N
GEOLOGY
31. Data presented on potential overpressure zones ........
32. Seismic analysis of shallow gas zones .............
33. Seabed condition survey (if off-shore) .............
N
34. Contact name/phone for weekly.progress repqrts ...... //. Y N
{expmratory on~yj
REMARKS
GEOLOGY: ENGINEERING: COMMISSION'
HOW/Ijt - A \FORMS\chekhst rev 09~97
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information-of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
OCT 1,5 1998
..............................
~ ............................
COMPANY NAIVlE : ARCO ALASKA, INC.
WELL NAlViE : WB-OSA
FIELD NAFiE : WEST B~CH
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 50-029-22817-01
REFERENCE NO : 98405
* ALASKA COMPUTING CENTER *
* *
....... SCHLUFIBERGER .......
******************************
COMPANY NAME : ARCO ALASKA, INC.
WELL NAME : WB-O5A
FIELD NAME : WEST BEACH
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUNiBER : 50-029-22817-01
REFERENCE NO : 98405
LIS Tape Verification Listing 5-0CT-1998 15:57
Schlumberger Alaska Computing Center
PAGE
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 98/10/ 5
ORIGIN : FLIC
REEL NAME : 98405
CONTINUATION # :
PREVIOUS REEL :
COMF~_2TT : ARCO ALASKA INC., WEST BEACH WB-5A, API #50-029-22817-01
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 98/10/ 5
ORIGIN : FLIC
TAPE NAM~ : 98405
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA INC., WEST BEACH WB-SA, API #50-029-22817-01
TAPE HEADER
WEST BEACH
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
BIT RUN I
.........
98405
NUTTER
DIXON
TOWNSHIP:
RANGE:
FNL :
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
WB-O5A
500292281701
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
5-0CT-98
BIT RUN 2 BIT RUN 3
25
12N
14E
104
3219
41.83
41.00
11.50
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 9.625 6640.0
6.000 7.000 9155.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
3RD STRING
PRODUCTION STRING
REMARKS:
Well drilled 8-DEC through 20-DEC-97 with MWD GR, IMP,
and ADN. Data was collected in 6 bit runs and one MAD
pass.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : 001C01
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NTgM~ER: 1
EDITED M~RGEDMWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMElVT: 0.5000
FILE S~Y
LDWG TOOL CODE
$
BASELINE CURVE FOR SHIFTS: NONE
CURVE SHIFT DATA (MEASUREDDEPTH)
START DEPTH STOP DEPTH
66.0 18033.0
BASELINE DEPTH
$
MERGED DATA SOURCE
LDWG TOOL CODE
$
REMARKS:
.......... EQUIVALENT UNSHIFTEDDEPTH ..........
MWD
BIT RUN NO. FIERGE TOP M~RGE BASE
1 66.0 16489.0
2 15151.0 17783.0
3 15359.0 16026.0
4 15894.0 16676.0
5 16587.0 17838.0
6 17783.0 18033.0
7 16489.0 16925.0
No depth adjustments made. The ADNquadrant outputs
are as follows: ROBB/ROBU/ROBL/ROBR are bottom, upper,
left, and right quadrant density; and are also listed
as RHO1, RH02, RH03, RH04 in the LDWG listing. The
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
other outputs (Delta Rho, PEF) are listed with their
quadrants as DRHB/DRHU/DRA~/DRHR, PEB/PEU/PEL/PER.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 72
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 14
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUF~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD F/HR 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
FET MWD 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
GR MWD GAPI 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
RPXXMWD OHI4~ 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
RPX MWD 0H~4~4000154 O0 000 O0 0 1 1 1 4 68 0000000000
RPS MWD 0~4000154 O0 000 O0 0 1 1 1 4 68 0000000000
RPM MWD OPiM~4000154 O0 000 O0 0 1 1 1 4 68 0000000000
RPD MWD 0H~4~4000154 O0 000 O0 0 1 1 1 4 68 0000000000
RHO1 MWD G/C3 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
RH02 MWD G/C3 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
RH03 MWD G/C3 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
RH04 MWD G/C3 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
DRHOMWD G/C3 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
NPHIMWD PU-S 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
TNRAMWD 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
PEF MWD 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
NAFiE SERV UNIT SERVICE API API API API FILE NUM~ NI3FIB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
TRPMMWD RPM 4000154 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 66.000 ROP.MWD -999.250 FET. MWD -999.250 GR.MWD
RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD
RPD.MWD -999.250 RHO1.MWD -999.250 PJqO2.MWD -999.250 RHO3.MWD
RHO4.MWD -999.250 DRHO.MWD -999.250 NPHI.MWD -999.250 TNRA.MWD
PEF.MWD -999.250 TRPM. MWD -999.250
DEPT. 1000.000 ROP.MWD 75.990 FET.MWD -999.250 GR.MWD
RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD
RPD.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO3.MWD
RIqO4.MWD -999.250 DRHO.MWD -999.250 NPHI.MWD -999.250 T1TRA.MWD
PEF.MWD -999.250 TRPM. MWD -999.250
DEPT. 2000.000 ROP.MWD 276.550 FET.MWD -999.250 GR.MWD
RP~.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD
RPD.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO3.MWD
RHO4.MWD -999.250 DRIqO.MWD -999.250 NPHI.MWD -999.250 T1TRA.MWD
PEF.MWD -999.250 TRPM. MWD -999.250
DEPT. 3000.000 ROP.MWD 125.240 FET.MWD -999.250 GR.MWD
RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD
RPD.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 PJqo3.MWD
RHO4.MWD -999.250 DRHO.MWD -999.250 NPHI.MWD -999.250 TNRA.MWD
PEF.MWD -999.250 TRPM. MWD -999.250
DEPT. 4000.000 ROP.MWD 113.550 FET.MWD -999.250 GR.MWD
RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM.MWD
RPD.MWD -999.250 RJqO1.MWD -999.250 RJqO2.MWD -999.250 RHO3.MWD
RHO4.MWD -999.250 DPJqO.MWD -999.250 NPHI.MWD -999.250 TNRA.MWD
PEF. MWD -999.250 TRPM. MWD -999.250
DEPT. 5000.000 ROP.MWD 175.370 FET.MWD -999.250 GR.MWD
RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD
RPD.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 PJqO3.MWD
RHO4.MWD -999.250 DRHO.MWD -999.250 NPHI.MWD -999.250 TNRA.MWD
PEF.MWD -999.250 TRPM. MWD -999.250
DEPT. 6000.000 ROP.MWD 149.860 FET.MWD -999.250 GR.MWD
RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250 RPM. MWD
RPD.MWD -999.250 RHO1.MWD -999.250 RHO2.MWD -999.250 RHO3.MWD
RHO4.MWD -999.250 DRHO.MWD -999.250 NPHI.MWD -999.250 TNRA.~
PEF.MWD -999.250 TRPM.MWD -999.250
16.180
-999.250
-999.250
-999.250
66.730
-999.250
-999.250
-999.250
24.220
-999.250
-999.250
-999.250
23.595
-999.250
-999.250
-999.250
77.030
-999.250
-999.250
-999.250
64.540
-999.250
-999.250
-999.250
79.110
-999.250
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
DEPT. 7000.000 ROP.MWD
RPXX.MWD -999.250 RPX.MWD
RPD.MWD -999.250 RHO1.MWD
RHO4.MWD -999.250 DRHO.MWD
PEF.MWD -999.250 TRPM. MWD
DEPT. 8000.000 ROP.MWD
RPXX.MWD -999.250 RPX.MWD
RPD.MWD -999.250 PJqO1.MWD
RHO4.MWD -999.250 DPOqO.MWD
PEF.MWD -999.250 TRPM.MWD
DEPT. 9000.000 ROP.MWD
RPXX.MWD -999.250 RPX.MWD
RPD.MWD -999.250 RHO1.MWD
RHO4.MWD -999.250 DRHO.MWD
PEF.MWD -999.250 TRPM.MWD
DEPT. 10000.000 ROP.MWD
RPXX.MWD -999.250 RPX.MWD
RPD.MWD -999.250 RHO1.MWD
RHO4.MWD -999.250 DPOqO.MWD
PEF.MWD -999.250 TRPM. MWD
DEPT. 11000.000 ROP.MWD
RPX=Y.MWD -999.250 RPX.MWD
RPD.MWD -999.250 RHO1.MWD
RHO4.MWD -999.250 DRHO.MWD
PEF.MWD -999.250 TRPM. MWD
DEPT. 12000.000 ROP.MWD
RPXX.MWD -999.250 RPX.MWD
RPD.MWD -999.250 RHO1.MWD
RHO4.MWD -999.250 DRHO.MWD
PEF.MWD -999.250 TRPM. MWD
257.660 FET.MWD -999.250
-999.250 RPS.MWD -999.250
-999.250 RHO2.MWD -999.250
-999.250 NPHI.MWD -999.250
-999.250
141.730 FET.MWD
-999.250 RPS.MWD
-999.250 R!402.MWD
-999.250 NPHI.MWD
-999.250
35.840 FET.MWD
-999.250 RPS.MWD
-999.250 RHO2.MWD
-999.250 NPHI.MWD
-999.250
105.290 FET.MWD
-999.250 RPS.MWD
-999.250 RHO2.MWD
-999.250 NPHI.MWD
-999.250
120.690 FET.MWD
-999.250 RPS.MWD
-999.250 RHO2.MWD
-999.250 NPHI.MWD
-999.250
139.060 FET.MWD
-999.250 RPS.MWD
-999.250 RHO2.MWD
-999.250 NPHI.MWD
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
DEPT. 13000.000 ROP.MWD 139.600 FET.MWD -999.250
RPXX.MWD -999.250 RPX.MWD -999.250 RPS.MWD -999.250
RPD.MWD -999.250 PJqO1.MWD -999.250 PJqO2.MWD -999.250
RHO4.MWD -999.250 DRHO.MWD -999.250 NPHI.MWD -999.250
PEF.MWD -999.250 TRPM.MWD -999.250
DEPT. 14000.000 ROP.MWD
RPXX.MWD -999.250 RPX.MWD
RPD.MWD -999.250 RHO1.MWD
RHO4.MWD -999.250 DRHO.MWD
PEF.MWD -999.250 TRPM. MWD
112.500 FET.MWD
-999.250 RPS.MWD
-999.250 RHO2.MWD
-999.250 NPHI.MWD
-999.250
75.590 FET.MWD
-999.250 RPS.MWD
-999.250 RHO2.MWD
-999.250 NPHI.MWD
-999.250
DEPT. 15000.000 ROP.MWD
RPXX.MWD -999.250 RPX.MWD
RPD.MWD -999.250 RHO1.MWD
RJqO4.MWD -999.250 DRHO.MWD
PEF.MWD -999.250 TRPM. MWD
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
GR.MWD
RPM.MWD
RH 0 3 . MWD
TNRA . MWD
GR.MWD
RPM.MWD
RH 0 3 . MWD
TNRA . MWD
GR.MWD
RPM. MWD
RH 0 3 . MWD
TNRA.MWD
GR .MWD
RPM.MWD
RH 0 3 . MWD
TNRA . MWD
GR.MWD
RPM.MWD
RH 0 3 . MWD
TNRA . MWD
GR.MWD
RPM. MWD
RH 0 3 . MWD
TNRA . MWD
GR.MWD
RPM. MWD
RH03 .MWD
TNRA . MWD
GR .MWD
RPM. MWD
RH 0 3 . MWD
TNRA . MWD
GR. MWD
RPM. MWD
RH 0 3 . MWD
TNRA . MWD
33.600
-999.250
-999.250
-999.250
112.320
-999.25O
-999.250
-999.250
65.280
-999.250
-999.250
-999.250
39.550
-999.250
-999.250
-999.250
30.720
-999.250
-999.250
-999.250
41.280
-999.250
-999.250
-999.250
93.120
-999.250
-999.250
-999.250
98.880
-999.250
-999.250
-999.250
106.560
-999.250
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
DEPT. 16000.000 ROP.MWD
RPXX.MWD 4.350 RPX.MWD
RPD.MWD 4.410 RHO1.MWD
RHO4.MWD 2.220 DRHO.MWD
PEF.MWD 3.350 TRPM. MWD
DEPT. 17000.000 ROP.MWD
RPXX. MWD 5.970 RPX. MWD
RPD.MWD 7.490 RHO1.MWD
RHO4.MWD -999.250 DRHO.MWD
PEF. MWD -999.250 TRPM.MWD
DEPT. 18000.000 ROP.MWD
RPXX.MWD -999.250 RPX.MWD
RPD.MWD -999.250 RHO1.MWD
RHO4.MWD -999.250 DRHO.MWD
PEF. MWD -999.250 TRPM. MWD
DEPT. 18033.000 ROP.MWD
RPXX.MWD -999.250 RPX.MWD
RPD.MWD -999.250 RHO1.MWD
RHO4.MWD -999.250 DRHO.MWD
PEF.MWD -999.250 TRPM.MWD
38.250 FET.MWD
4.380 RPS.MWD
2.530 RHO2.MWD
0.070 NPHI.MWD
63.880
70.870 FET.MWD
6.140 RPS.MWD
-999.250 RHO2.MWD
-999.250 NPHI.MWD
-999.250
16.510 FET.MWD
-999.250 RPS.MWD
-999.250 RHO2.MWD
-999.250 NPHI.MWD
-999.250
12.780 FET.MWD
-999.250 RPS.MWD
-999.250 RHO2.MWD
-999.250 NPHI.MWD
-999.250
1.075 GR.MWD
4.370 RPM. MWD
1.750 RHO3.MWD
32.000 TNRA.MWD
2.024 GR.MWD
6.450 RPM. MWD
-999.250 RHO3.MWD
-999.250 TNRA.MWD
-999.250 GR.MWD
-999.250 RPM. MWD
-999.250 RHO3.MWD
-999.250 TNRA.MWD
-999.250 GR.MWD
-999.250 RPM. MWD
-999.250 RHO3.MWD
-999.250 TArRA.MWD
86.680
4.370
2.000
-999.250
89.090
6.950
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER:
EDITED MERGEDMAD
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
Depth shifted and clipped curves; all MAD runs merged using earliest passes.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE
..............
$
MERGED DATA SOURCE
LDWG TOOL CODE
$
REMARKS:
START DEPTH STOP DEPTH
16489.0 16925.0
MAD RUNNO. MAD PASS NO. FiERGE TOP Pfl~RGE BASE
This is the data from the MAD pass run after bit run 5.
No footage was drilled due to hole conditions.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
* * SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 92
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE ~ NUMiB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 2 1 1 4 68 0000000000
ROP MAD F/HR 4000154 O0 000 O0 0 2 1 1 4 68 0000000000
TABR MAD 4000154 O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
NAME SERV UNIT SERVICE API API API API FILE ND?4B NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
GR MAD GAPI 4000154
PiOHMAD 0HM~4000154
P16HMAD OH2V~4000154
P22HMAD OH~M4000154
P28HMAD 0HF~44000154
P34HMAD 0t{F~4000154
TNPHMAD PU 4000154
ROBBMAD G/C3 4000154
ROBUMAD G/C3 4000154
ROBLMAD G/C3 4000154
ROBRMAD G/C3 4000154
DRHB MAD G/C3 4000154
DRHUMAD G/C3 4000154
DRHLMAD G/C3 4000154
DRHR MAD G/C3 4000154
PEB MAD 4000154
PEU MAD 4000154
PEL MAD 4000154
PER MAD 4000154
RPM MAD RPM 4000154
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
O0 000 O0 0 2 1 1 4 68 0000000000
** DATA **
DEPT. 16489.000
PiOH.MAD -999.250
P34H.MAD -999.250
ROBL.MAD -999.250
DRHL.MAD -999.250
PEL.MAD -999.250
DEPT. 16924.000
PiOH.MAD -999.250
P34H.MAD -999.250
ROBL.MAD -999.250
DRHL.MAD -999.250
PEL.MAD -999.250
ROP.MAD -999.250 TABR.MAD -999.250 GR.MAD
P16H.MAD -999.250 P22H. MAD -999.250 P28H.MAD
TNPH.MAD -0.310 ROBB.MAD -999.250 ROBU. MAD
ROBR.MAD -999.250 DRHB.MAD -999.250 DRHU. MAD
DRHR.MAD -999.250 PEB.MAD -999.250 PEU. MAD
PER.MAD -999.250 RPM. MAD -999.250
ROP.MAD 155.160 TABR.MAD -999.250 GR.MAD
P16H.MAD -999.250 P22H.MAD -999.250 P28H. MAD
TNPH.MAD -999.250 ROBB.MAD -999.250 ROBU. MAD
ROBR.MAD -999.250 DRHB.MAD -999.250 DRHU.MAD
DRHR.MAD -999.250 PEB.MAD -999.250 PEU.MAD
PER.MAD -999.250 RPM. MAD -999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 3
EDITED MERGEDMAD
Depth shifted and clipped curves; all MAD runs merged using earliest passes.
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE
$
MERGED DATA SOURCE
LDWG TOOL CODE
$
REMARKS:
This is the data from the MADpass run after bit run 5.
No footage was drilled due to hole conditions.
$
START DEPTH STOP DEPTH
16489.0 16925.0
MAD RUN NO. MAD PASS NO. M~RGE TOP FZERGE BASE
LIS FORMAT DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
10
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 92
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN**
NAME SERV UNIT SERVICE API API API API FILE NUM~ NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
ROP MAD F/HR 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
TABR MAD 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
GR MAD GAPI 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
PiOHMAD 0HI~44000154 O0 000 O0 0 3 1 1 4 68 0000000000
P16HMAD 0H~4~4000154 O0 000 O0 0 3 1 1 4 68 0000000000
P22HMAD 0H~4000154 O0 000 O0 0 3 1 1 4 68 0000000000
P28HMAD 0H~4~4000154 O0 000 O0 0 3 1 1 4 68 0000000000
P34HMAD 0H~4000154 O0 000 O0 0 3 1 1 4 68 0000000000
TNPHMAD PU 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
ROBBMAD G/C3 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
ROBUMAD G/C3 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
ROBLMAD G/C3 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
ROBRMAD G/C3 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
DRHB MAD G/C3 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
DRHUMAD G/C3 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
DRHL MAD G/C3 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
DRHR MAD G/C3 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
PEB MAD 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
PEU MAD 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
PEL MAD 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
PER MAD 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
RPM MAD RPM 4000154 O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
11
** DATA **
DEPT. 16489.000 ROP.MAD
PiOH.MAD -999.250 P16H.MAD
P34H.MAD -999.250 TNPH.MAD
ROBL.MAD -999.250 ROBR.MAD
DRHL.MAD -999.250 DRHR.MAD
PEL.MAD -999.250 PER.MAD
-999.250 TABR.MAD
-999.250 P22H.MAD
-0.310 ROBB.MAD
-999.250 DPJqB.MAD
-999.250 PEB.MAD
-999.250 RPM. MAD
-999.250 GR.MAD
-999.250 P28H.MAD
-999.250 ROBU. MAD
-999.250 DRHU.MAD
-999.250 PEU.MAD
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION · O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE IVTJ~fBER 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NIk~BER: 1
DEPTH INCREMENT: O. 5000
FILE SUNkIARY
VENDOR TOOL CODE START DEPTH
MWD 66.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIFiE) :
STOP DEPTH
15744.0
20 -DEC- 97
5B36
4.0C
REAL-TIME
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
12
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAM~ RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT):
18033.0
66.0
18033.0
70
0.1
65.1
TOOL NUMBER
MWDGR
8.500
6640.0
BOREHOLE CONDITIONS
MUD TYPE: 3 % KCL
MUD DENSITY (LB/G): 10.80
MUD VISCOSITY (S) : 47.0
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OHIO4) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT): 0.327
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT): O. 254
MUD CAKE AT (MT): O. 383
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS: *** RUN1 66'-15744' MWD GR ******
ORIGINAL HOLE (WB-05) SIDETRACKED AT 15242'
*** RUN2 15242'-15475' IMP/ADN4 ***
*** RUN3 15475'-16027' IMP/ADN4 ***
*** RUN 4 16027'-16677' IMP/ADN4 ***
*** RUN5 16677'-17838' IMP ***
*** RUN 6 16530'-16925' IMP/ADN (MAD DATA)***
*** RUN 7 17838'-18033' IMP ***
$
LIS FORMAT DATA
70.0
70.0
70.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
13
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 12
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 85
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
* * SET TYPE - CHAN * *
NAME SERV UNIT SERVICE API API API API FILE ~ ~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD lVTJY4~SAMP ELEM CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 4 1 1 4 68 0000000000
ROP LW1 F/HR 4000154 O0 000 O0 0 4 1 1 4 68 0000000000
GR LW1 GAPI 4000154 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 65. 500 ROP. LW1 -999. 250 GR. LW1 8. 090
DEPT. 1000. 000 ROP. LW1 75. 990 GR. LW1 66. 730
DEPT. 2000. 000 ROP. LW1 276. 550 GR. LW1
DEPT. 3000. 000 ROP. LW1 125. 240 GR. LW1
DEPT. 4000. 000 ROP. LW1 113 . 550 GR. LWi
DEPT. 5000. 000 ROP. LWl 175. 370 GR. LW1
DEPT. 6000. 000 ROP. LW1 149. 860 GR. LW1
24 220
23 595
77 030
64 540
79 110
DEPT. 7000.000 ROP.LW1 257.660 GR.LW1 33 600
·
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
14
DEPT. 8000. 000 ROP. LW1 141.730 GR. LW1 112. 320
DEPT. 9000. 000 ROP. LW1 35. 840 GR. LW1 65. 280
DEPT. 10000.000 ROP.LW1 105.290 GR.LW1 39.550
DEPT. 11000. 000 ROP. LW1 120. 690 GR.LW1 30. 720
DEPT. 12000.000 ROP.LW1 139.060 GR.LW1 41.280
DEPT. 13000.000 ROP.LW1 139.600 GR.LW1 93.120
DEPT. 14000. 000 ROP. LW1 112. 500 GR. LW1 98. 880
DEPT. 15000.000 ROP.LW1 75.590 GR.LW1 106.560
DEPT. 16000. 000 ROP. LW1 38. 250 GR . LW1
DEPT. 17000. 000 ROP. LW1 70. 870 GR. LW1
86.680
89.090
DEPT. 18033. 000 ROP. LWl 12. 780 GR. LW1 - 999. 250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: 0.5000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
15
FILE SUMFL~gY
VENDOR TOOL CODE START DEPTH
LOG HEADER DATA
15151.0
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or ~-TIlVlE) :
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
IMP RESIST./GR
ADN AZIM. DENS./NEUT.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
STOP DEPTH
..........
15475.0
20-DEC-97
5B3 6
4.0C
i~EMOR Y
18033.0
66.0
18033.0
60
63.5
65.1
TOOL NUMBER
IMP 028
ADN4 023
8.500
6640.0
BOREHOLE CONDITIONS
MUD TYPE: 3% KCL
MUD DENSITY (LB/G): 10.80
MUD VISCOSITY (S) : 47.0
MUD PH:
MUD CHLORIDES (PPM) : 10940
FLUID LOSS (C3):
RESISTIVITY (OHP94) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT): O. 327
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT): O. 254
MUD CAKE AT (MT): O. 383
NEUTRON TOOL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): 1.0
EWR FREQUENCY (HZ): 20000
REMARKS: *** RUN 1 66'-15744' MWD GR ******
ORIGINAL HOLE (WB-05) SIDETRACKED AT 15242'
70.0
70.0
70.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
16
*** RUN 2 15242'-15475' IMP/ADN4 ***
*** RUN 3 15475'-16027' IMP/ADN4 ***
*** RUN 4 16027'-16677' IMP/ADN4 ***
*** RUN 5 16677'-17838' IMP ***
*** RUN 6 16530'-16925' IMP/ADN (MAD DATA)***
*** RUN 7 17838'-18033' IMP ***
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 104
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 9
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
ROP LW2 F/HR 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
TABR LW2 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
TAB LW2 HR 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
TABD LW2 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
GR LW2 GAPI 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
PiOH LW2 OHMM4000154 O0 000 O0 0 5 1 1 4 68 0000000000
P16H LW2 0H~4000154 O0 000 O0 0 5 1 1 4 68 0000000000
P22H LW2 OH~M4000154 O0 000 O0 0 5 1 1 4 68 0000000000
P28H LW2 0H~4~4000154 O0 000 O0 0 5 1 1 4 68 0000000000
P34H LW2 0H~4~4000154 O0 000 O0 0 5 1 1 4 68 0000000000
TNPH LW2 PU 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
TNRA LW2 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
17
NAME SERVUNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CI_~SS MOD ~ Sgl~IP ELE3I CODE (HEX)
ROBB LW2 G/C3 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
ROBU LW2 G/C3 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
ROBL LW2 G/C3 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
ROBR LW2 G/C3 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
DRHB LW2 G/C3 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
DRHU LW2 G/C3 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
DRHL LW2 G/C3 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
DRHR LW2 G/C3 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
PEB LW2 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
PEU LW2 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
PEL LW2 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
PER LW2 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
RPM LW2 RPM 4000154 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 15151.000 ROP.LW2 -999.250 TABR.LW2 0.000 TAB.LW2
TABD.LW2 0.000 GR.LW2 7.325 PIOH. LW2 1000.000 P16H. LW2
P22H.LW2 110.580 P28H.LW2 50.353 P34H. LW2 42.037 TNPH. LW2
TNRA.LW2 116.209 ROBB.LW2 -1 . 663 ROBU. LW2 -1 . 663 ROBL.LW2
ROBR . LW2 -1. 663 DRHB . LW2 -7. 681 DRHU. LW2 -7. 681 DRHL . LW2
DRHR.LW2 -7.681 PEB.LW2 -0.073 PEU. LW2 -0.073 PEL.LW2
PER. LW2 - O . 073 RPM. LW2 O . 000
DEPT. 15475.500 ROP.LW2 21.028 TABR.LW2
TABD.LW2 48470. 000 GR.LW2 76. 641 PiOH. LW2
P22H. LW2 4. 739 P28H. LW2 4. 774 P34H. LW2
TNRA.LW2 14. 894 ROBB.LW2 2. 023 ROBU. LW2
ROBR. LW2 2. 023 DRHB. LW2 O. 210 DRHU. LW2
DRHR.LW2 0.210 PEB.LW2 13.136 PEU. LW2
PER.LW2 13. 136 RPM. LW2 O. 000
32580 000 TAB.LW2
4 655 P16H. LW2
4 824 TNPH. LW2
2 023 ROBL. LW2
0 210 DRHL. LW2
13 136 PEL.LW2
O. 000
1000. 000
341. 227
-1. 663
-7. 681
-0. 073
9. 414
4. 706
27. 670
2. 023
O. 210
13.136
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE · FLIC
VERSION · O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verikication Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
18
**** FILE HEADER ****
FILE NAME : EDIT .006
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/1 O~ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SO?~4ARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
15359.0 16026.0
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIldE):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) ..
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
IMP RESIST./GR
ADN AZIM. DENS./NEUT.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) :
DRILLERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
20-DEC-97
5B36
4.0C
Mt~MORY
18033.0
66.0
18033.0
60
44.6
60.4
TOOL NUMi~ER
...........
IMP 028
ADN4 023
8.500
6640.0
3~ KCL
10.80
47.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
19
MUD CHLORIDES (PPM) : 10940
FLUID LOSS (C3):
RESISTIVITY (OP~4~) AT TEMPERATURE (DEGF):
MUD AT MEAS~ TEMPERATURE (MT): O. 327
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT): O. 254
MUD CAKE AT (MT): O. 3 83
NEUTRON TOOL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): 1.0
EWR FREQUENCY (HZ): 20000
REMARKS: *** RUN1 66'-15744' MWDGR ******
ORIGINAL HOLE (WB-05) SIDETRACKED AT 15242'
*** RUN2 15242'-15475' IMP/ADN4 ***
*** RUN3 15475'-16027' IMP/ADN4 ***
*** RUN4 16027'-16677' IMP/ADN4 ***
*** RUN5 16677'-17838' IMP ***
*** RUN 6 16530'-16925' IMP/ADN (MAD DATA)***
*** RUN7 17838'-18033' IMP ***
$
LIS FORMAT DATA
70.0
70.0
70.0
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 104
4 66 255
$ 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 9
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
20
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB ~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD ~ SAMP ELEM CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
ROP LW3 F/HR 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
TABR LW3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
TAB LW3 HR 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
TABD LW3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
GR LW3 GAPI 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
PiOH LW3 OH~4~ 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
P16H LW3 OHFiM 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
P22H LW3 OH~4M 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
P28H LW3 OH~IM4000154 O0 000 O0 0 6 1 1 4 68 0000000000
P34H LW3 OHMM4000154 O0 000 O0 0 6 1 1 4 68 0000000000
TNPH LW3 PU 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
TN-RA LW3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
ROBB LW3 G/CS 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
ROBU LW3 G/C3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
ROBL LW3 G/C3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
ROBR LW3 G/C3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
DRHB LW3 G/C3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
DRHU LW3 G/C3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
DRHL LW3 G/C3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
DRHR LW3 G/C3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
PEB LW3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
PEU LW3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
PEL LW3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
PER LW3 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
RPM LW3 RPM 4000154 O0 000 O0 0 6 1 1 4 68 0000000000
** DATA **
DEPT. 15359. 000 ROP.LW3 -999.250 TABR.LW3 O. 000 TAB.LW3
TABD. LW3 O. 000 GR.LW3 -2408. 193 PiOH. LW3 1000. 000 P16H. LW3
P22H. LW3 1000. 000 P28H. LW3 1000. 000 P34H. LW3 1000. 000 TNPH. LW3
TNRA. LW3 24. 718 ROBB.LW3 -1. 663 ROBU. LW3 -1 . 663 ROBL. LW3
ROBR. LW3 -1 . 663 DRHB. LW3 -7. 681 DRHU. LW3 -7. 681 DRHL. LW3
DRHR. LW3 - 7. 681 PEB.LW3 -0. 073 PEU. LW3 -0. 073 PEL.LW3
PER. LW3 - O. 073 RPM. LW3 O. 000
DEPT.
TABD. LW3
P22H. LW3
TNRA. LW3
ROBR. LW3
DRHR. LW3
PER. LW3
16000 000
18760 000
6 072
16 192
2 400
0 201
5 335
ROP. LW3
GR. LW3
P28H.LW3
ROBB. LW3
DRHB . LW3
PEB.LW3
RPM. LW3
38.248
84 350
5 970
2 591
0 066
3 311
50 000
TABR. LW3 12790. 000 TAB. LW3
P1 OH. LW3 6.130 P16H. LW3
P34H. LW3 5. 787 TNPH. LW3
ROBU. LW3 2.127 ROBL. LW3
DRHU. LW3 O . 237 DRHL . LW3
PEU. LW3 9. 244 PEL. LW3
O. 000
1000. 000
49. 744
-1. 663
-7. 681
-0. 073
3. 947
6. 092
30. 478
2. 361
0.211
5. 693
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
21
DEPT. 16026. 500 ROP. LW3
TABD. LW3 18760. 000 GR. LW3
P22H. LW3 6. 072 P28H. LW3
TNRA. LW3 16.192 ROBB. LW3
ROBR.LW3 2. 400 DRHB.LW3
DRHR . LW3 0.201 PEB. LW3
PER. LW3 5. 335 RPM. LW3
18.293 TABR. LW3
84.350 P1 OH. LW3
5 . 970 P34H. LW3
2. 591 ROBU. LW3
O . 066 DRHU. LW3
3. 311 PEU. LW3
50. 000
12790. 000 TAB. LW3
6.130 P16H. LW3
5. 787 TNPH. LW3
2.127 ROBL. LW3
0.237 DRHL.LW3
9.244 PEL.LW3
3. 947
6. 092
30.478
2. 361
0.211
5. 693
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .006
SERVICE · FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 4
DEPTH INCREMENT: O. 5000
FILE SUN~4ARY
VENDOR TOOL CODE START DEPTH
MWD 15894.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME):
TD DRILLER (FT) :
STOP DEPTH
16676.0
20-DEC-97
5B36
4.0C
~EMORY
18033.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
22
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
66.0
18033.0
60
50.2
71.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
IMP RESIST./GR
ADN AZIM. DENS./NEUT.
$
TOOL NUMBER
IMP 028
ADN4 023
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
8.500
6640.0
BOREHOLE CONDITIONS
MUD TYPE: 3 % KCL
MUD DENSITY (LB/G): 10.80
MUD VISCOSITY (S) : 47.0
MUD PH:
MUD CHLORIDES (PPM): 11340
FLUID LOSS (C3):
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT): 0.327
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT): O. 254
MUD CAKE AT (MT): O. 383
NEUTRON TOOL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): 1.0
EWR FREQUENCY (HZ): 20000
REPLARKS: *** RUN1 66'-15744' MWDGR ******
ORIGINAL HOLE (WB-05) SIDETRACKED AT 15242'
*** RUN2 15242'-15475' IMP/ADN4 ***
*** RUN3 15475'-16027' IMP/ADN4 ***
*** RUN4 16027'-16677' IMP/ADN4 ***
*** RUN5 16677'-17838' IMP ***
*** RUN6 16530'-16925' IMP/ADN (MAD DATA)***
*** RUN7 17838'-18033' IMP ***
$
LIS FORMAT DATA
70.0
70.0
70.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
23
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 92
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
ROP LW4 F/HR 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
TABR LW4 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
GR LW4 GAPI 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
PIOH LW4 OHF~f4000154 O0 000 O0 0 7 1 1 4 68 0000000000
P16H LW4 OHI~M4000154 O0 000 O0 0 7 1 1 4 68 0000000000
P22H LW4 0P~4~4000154 O0 000 O0 0 7 1 1 4 68 0000000000
P28H LW4 OH~4M4000154 O0 000 O0 0 7 1 1 4 68 0000000000
P34H LW4 0H~4~4000154 O0 000 O0 0 7 1 1 4 68 0000000000
TNPH LW4 PU 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
ROBB LW4 G/C3 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
ROBU LW4 G/C3 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
ROBL LW4 G/C3 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
ROBR LW4 G/C3 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
DRHB LW4 G/C3 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
DRHU LW4 G/C3 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
DRHL LW4 G/C3 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
DRHR LW4 G/CS 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
PEB LW4 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
PEU LW4 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
PEL LW4 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
PER LW4 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
RPM LW4 RPM 4000154 O0 000 O0 0 7 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
24
** DATA **
DEPT. 15894. 000 ROP. LW4
PiOH.LW4 -999.250 P16H. LW4
P34H. LW4 -999. 250 TNPH. LW4
ROBL. LW4 2. 450 ROBR. LW4
DRHL.LW4 O. 120 DRHR.LW4
PEL.LW4 4. 400 PER.LW4
DEPT. 16000. 000 ROP. LW4
PIOH.LW4 4.350 P16H.LW4
P34H. LW4 4. 410 TNPH. LW4
ROBL. LW4 2. 000 ROBR . LW4
DRHL.LW4 O. 090 DRHR.LW4
PEL. LW4 7. 580 PER. LW4
DEPT. 16676. 500 ROP. LW4
PiOH.LW4 9.250 P16H.LW4
P34H. LW4 -999. 250 TNPH. LW4
ROBL. LW4 -999. 250 ROBR. LW4
DRHL. LW4 - 999.250 DRHR. LW4
PEL. LW4 -999. 250 PER. LW4
-999. 250 TABR. LW4
-999. 250 P22H. LW4
O. 280 ROBB. LW4
2. 450 DRHB.LW4
O. 120 PEB.LW4
4. 400 RPM. LW4
4561. 891 TABR. LW4
4. 380 P22H. LW4
O. 320 ROBB. LW4
2.220 DRHB.LW4
O . 140 PEB . LW4
6. 240 RPM. LW4
42. 260 TABR. LW4
- 999.250 P22H. LW4
- 999. 250 ROBB. LW4
-999. 250 DRHB. LW4
-999. 250 PEB. LW4
-999. 250 RPM. LW4
-999. 250 GR.LW4
-999. 250 P28H. LW4
2. 450 ROBU. LW4
O. 120 DRHU. LW4
4. 400 PEU. LW4
O. 000
3870. 000 GR.LW4
4.370 P28H. LW4
2.530 ROBU. LW4
O. 070 DRHU. LW4
3. 350 PEU. LW4
63. 900
-999. 250 GR. LW4
-999. 250 P28H. LW4
-999. 250 ROBU. LW4
-999. 250 DR3tU. LW4
-999. 250 PEU. LW4
-999.250
-999.250
-999.250
2.450
0.120
4.400
86.680
4.370
1.750
0.060
12.460
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .007
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .008
SERVICE · FLIC
VERSION · O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
25
DEPTH INCREM~2TT: 0.5000
FILE S~Y
VENDOR TOOL CODE START DEPTH
STOP DEPTH
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
'SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIME)
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
IMP RESIST./GR
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN) :
DRILLERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OH~) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20-DEC-97
5B3 6
4.0C
MEMORY
18033.0
66.0
18033.0
70
69.0
71.2
TOOL NUMBER
...........
IMP 036
8.500
6640.0
3% KCL
10.80
47.0
0.327 70.0
0.254 70.0
0.383 70.0
REMARKS: *** RUN1 66'-15744' MWD GR ******
ORIGINAL HOLE (WB-05) SIDETRACKED AT 15242'
20000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
26
*** RUN 2 15242'-15475' IMP/ADN4 ***
*** RUN 3 15475'-16027' IMP/ADN4 ***
*** RUN 4 16027'-16677' IMP/ADN4 ***
*** RUN 5 16677'-17838' IMP ***
*** RUN 6 16530'-16925' IMP/ADN (MAD DATA)***
*** RUN 7 17838'-18033' IMP ***
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 36
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 28
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 8 1 1 4 68 0000000000
ROP LW5 F/HR 4000154 O0 000 O0 0 8 1 1 4 68 0000000000
TABR LW5 4000154 O0 000 O0 0 8 1 1 4 68 0000000000
GR LW5 GAPI 4000154 O0 000 O0 0 8 1 1 4 68 0000000000
PiOH LW5 0H~4000154 O0 000 O0 0 8 1 1 4 68 0000000000
P16H LW5 Otff4M4000154 O0 000 O0 0 8 1 1 4 68 0000000000
P22H LW5 0H~I4000154 O0 000 O0 0 8 1 1 4 68 0000000000
P28H LW5 0I~4M4000154 O0 000 O0 0 8 1 1 4 68 0000000000
P34H LW5 0HM~4000154 O0 000 O0 0 8 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
27
** DATA **
DEPT. 16587. 000 ROP. LW5
PiOH. LW5 4. 040 P16H. LW5
P34H. LW5 4. 620
DEPT. 17000. 000 ROP. LW5
PiOH. LW5 5. 970 P16H. LW5
P34H. LW5 7. 490
DEPT. 17838. 000 ROP. LW5
PiOH.LW5 -999.250 P16H. LW5
P34H. LW5 -999. 250
41. 470 TABR. LW5
4 . 190 P22H. LW5
70. 870 TABR. LW5
6 . 140 P22H. LW5
8. 050 TABR. LW5
-999. 250 P22H. LW5
0.000
4.250
7289.980
6.450
-999.250
-999.250
GR. LW5
P28H. LW5
GR . LW5
P28H. LW5
GR. LW5
P28H. LW5
78.800
4.370
89.090
6.950
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .008
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .009
SERVICE : FLIC
VERSION · O01CO1
DATE · 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE H~ER
FILE 19Zk4BER 9
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 6
DEPTH INCREMENT: O. 5000
FILE SU~ff~RY
VENDOR TOOL CODE START DEPTH STOP DEPTH
MWD 17783.0 18033.0
$
LOG HEADER DATA
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE
28
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL-TIM~) :
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
IMP RESIST./GR
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (OH~4M) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TE~IPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
20 -DEC - 97
5B36
4.0C
FIEM O R Y
18033.0
66.0
18033.0
60
69.0
71.2
TOOL NUMBER
IMP 036
8.500
6640.0
3% KCL
10.80
47.0
0.327 70.0
0.254 70.0
0.383 70.0
REMARKS: *** RUN1 66'-15744' MWD GR ******
ORIGINAL HOLE (WB-05) SIDETRACKED AT 15242'
*** RUN2 15242'-15475' IMP/ADN4 ***
*** RUN3 15475'-16027' IMP/ADN4 ***
*** RUN4 16027'-16677' IMP/ADN4 ***
*** RUN5 16677'-17838' IMP ***
*** RUN6 16530'-16925' IMP/ADN (MAD DATA)***
*** RUN7 17838'-18033' IMP ***
$
LIS FORMAT DATA
20000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
29
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 36
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 28
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUFiB NUbIB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD~ SAMP ELEM CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 9 1 1 4 68 0000000000
ROP LW6 F/HR 4000154 O0 000 O0 0 9 1 1 4 68 0000000000
TABR LW6 4000154 O0 000 O0 0 9 1 1 4 68 0000000000
GR LW6 GAPI 4000154 O0 000 O0 0 9 1 1 4 68 0000000000
PiOH LW6 0H~4~4000154 O0 000 O0 0 9 1 1 4 68 0000000000
P16H LW6 0H~4~4000154 O0 000 O0 0 9 1 1 4 68 0000000000
P22H LW6 0Hb~4000154 O0 000 O0 0 9 1 1 4 68 0000000000
P28H LW6 0H~4000154 O0 000 O0 0 9 1 1 4 68 0000000000
P34H LW6 0H~I~4000154 O0 000 O0 0 9 1 1 4 68 0000000000
** DATA **
DEPT. 17783.000 ROP.LW6 -999.250 TABR.LW6 0.000 GR.LW6
PiOH.LW6 8.970 P16H. LW6 8.890 P22H. LW6 9.060 P28H. LW6
P34H.LW6 8.970
DEPT. 18000.000 ROP.LW6 16.510 TABR.LW6 -999.250 GR.LW6
PiOH.LW6 -999.250 P16H. LW6 -999.250 P22H. LW6 -999.250 P28H.LW6
P34H.LW6 -999.250
58.240
9.150
-999.250
-999.250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
3O
DEPT. 18033.000 ROP. LW6
PiOH. LW6 -999.250 P16H. LW6
P34H. LW6 -999.250
12.780 TABR.LW6
-999.250 P22H. LW6
-999.250 GR.LW6 -999.250
-999.250 P28H. LW6 -999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .009
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .010
SERVICE : FLIC
VERSION · O01CO1
DATE : 98/10/ $
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 10
RAW MAD
Curves and log header data for each pass of each run in separate files.
MAD RUN NUMBER: 6
MAD PASS NUMBER: 1
DEPTH INCREMENT: O. 5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
MAD 16489.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY or REAL~TI~E) :
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
STOP DEPTH
..........
16926.0
20 -DEC- 97
5B36
4.0C
lciEMORY
18033.0
66.0
18033.0
60
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
31
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
IMP RESIST./GR
ADN AZIM. DENS./NEUT.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) '.
69.0
71.5
TOOL NUMBER
IMP 036
ADN4 023
8.500
6640.0
BOREHOLE CONDITIONS
MUD TYPE: 3~ KCL
MUD DENSITY (LB/G): 10.80
MUD VISCOSITY (S) : 47.0
MUD PH:
MUD CHLORIDES (PPM) : 14000
FLUID LOSS (C3):
RESISTIVITY (0H~94) AT TEMPERATURE (DEGF):
MUD AT MEASURED TEMPERATURE (MT): O. 327
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT): O. 254
MUD CAKE AT (MT): 0.383
NEUTRON TOOL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): 1.0
EWR FREQUENCY (HZ): 20000
REMARKS: *** RUN1 66'-15744' MWD GR ******
ORIGINAL HOLE (WB-05) SIDETRACKED AT 15242'
*** RUN2 15242'-15475' IMP/ADN4 ***
*** RUN3 15475'-16027' IMP/ADN4 ***
*** RUN4 16027'-16677' IMP/ADN4 ***
*** RUN5 16677'-17838' IMP ***
*** RUN6 16530'-16925' IMP/ADN (MAD DATA)***
*** RUN 7 17838'-18033' IMP ***
$
LIS FORMAT DATA
70.0
70.0
70.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE: 32
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 92
4 66 255
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 11
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NLrM~ SAMP ELEM CODE (HEX)
DEPT FT 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
ROP MAi F/HR 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
TABR MAI 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
GR MAI GAPI 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
PiOHMA1 OH~ 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
P16HMA1 OH~4~ 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
P22HMA1 OH~ 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
P28HMA1 OHMM 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
P34HMA1 OH~M 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
TNPHMA1 PU 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
ROBBMA1 G/C3 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
ROBUMA1 G/C3 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
ROBL MAI G/C3 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
ROBR MAI G/C3 4000154 O0 000 O0 0 !0 1 1 4 68 0000000000
DRHB MAI G/C3 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
DRHUMA1 G/C3 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
DRHL MAi G/C3 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
DRHR MAi G/C3 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
PEB MAI 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
PEU MAI 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
PEL MAi 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
PER MAi 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
RPM MAI RPM 4000154 O0 000 O0 0 10 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
5-0CT-1998 15:57
PAGE:
33
** DATA **
DEPT. 16488.500 ROP.MA1
PIOH.MA1 3.980 P16H. MA1
P34H.MA1 4.370 TNPH.MA1
ROBL.MA1 -999.250 ROBR.MA1
DRHL.MA1 -999.250 DRHR.MA1
PEL.MA1 -999.250 PER.MAI
DEPT. 16925.000 ROP.MA1
PiOH. MA1 -999.250 P16H.MA1
P34H.MA1 -999.250 TNPH.MA1
ROBL.MA1 -999.250 ROBR.MA1
DRHL.MA1 -999.250 DRHR.MA1
PEL.MA1 -999.250 PER.MAi
-999.250 TABR.MA1
4.190 P22H.MA1
-0.640 ROBB.MA1
-999.250 DRHB.MA1
-999.250 PEB.MA1
-999.250 RPM. MA1
193.560 TABR.MA1
-999.250 P22H.MA1
-999.250 ROBB.MA1
-999.250 DRHB.MA1
-999.250 PEB.MA1
-999.250 RPM. MA1
0.000 GR.MA1
4.290 P28H.MA1
-999.250 ROBU. MA1
-999.250 DRHU. MAi
-999.250 PEU.MA1
-999.250
-999.250 GR.MAi
-999.250 P28H.MA1
-999.250 ROBU. MA1
-999.250 DRHU. MA1
-999.250 PEU. MA1
-999.250
89.570
4.320
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .010
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/10/ 5
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 98/10/ 5
ORIGIN : FLIC
TAPE NAME : 98405
CONTINUATION # : 1
PREVIOUS TAPE :
CO~4ENT : ARCO ALASKA INC., WEST BEACH WB-SA, API #50-029-22817-01
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/10/ 5
ORIGIN : FLIC
REEL NAME : 98405
CONTINUATION # :
PREVIOUS REEL :
COMMENT : ARCO ALASKA INC., WEST BEACH WB-SA, API #50-029-22817-01