Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-144 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG No. of Completions 1a. Well Status: 0 Oil 0 Gas 0 Plugged 1m Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 0 GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 1068' SNL, 522' EWL, SEC. 34, T11N, R14E, UM Top of Productive Horizon: 2328' NSL, 114' EWL, SEC. 26, T11 N, R14E, UM Total Depth: 2214' NSL, 1735' EWL, SEC. 26, T11N, R14E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 676720 y- 5949869 Zone- ASP4 TPI: x- 681504 y- 5953380 Zone- ASP4 Total Depth: x- 683127 y- 5953306 Zone- ASP4 18. Directional Survey 0 Yes 1m No 21. Logs Run: SWS Gamma 1 CNL 1 CCL, MWD 1 GR Zero Other 5. Date Comp., Susp., or Aband. 10/28/2003 6. Date Spudded 09/21/1998 7. Date TD. Reached 10/19/1998 8. Elevation in feet (indicate KB, OF, etc.) KBE = 60' 9. Plug Back Depth (MD+ TVD) 10885 + 8931 10. Total Depth (MD+TVD) 12761 + 8931 11. Depth where SSSV set N/A MD 19. Water depth, if offshore NI A MSL 22. CASING SIZE WT. PER FT. . GRADE .. 20" 91.5# H-40 13-3/8" 68# 1 72# K-55 1 L-80 9-518" 47# L-80 7" 29# L-80 3-3/16" x 2-7/8" 6.2# 1 6.5# L-80 CEMENTING RECORD .:... 2150# Poleset 2000 sx CS III, 200 sx CS I, 600 sx 'G' 629 sx Class 'G', 400 sx CS I 50 sx Class 'G' 140 sx LARC 23. Perforations oRen to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state IInonell): None MD TVD MD 26. Date First Production: Not on Production Date of Test Hours Tested TUSING RECORD SIZE DEPTH SET (MD) 4-1/211, 12.6#, L-80 10034' 5-1/2", 17#, L-80 x 4-1/2", 12.6#, L-80 10032' - 10259' 25. . ... ACID;FRACTURE,CEMENT SauEEzE,ETC. " ,'. .. .. .:. 24. TVD DEPTH INTERVAL MD 10885' 1 0800' PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL-Bel GAs-McF WATER-BBl PRODUCTION FOR TEST PERIOD Ft Ft 1b. Well Class: 1m Development 0 Exploratory 0 Stratigraphic 0 Service 12. Permit Number 198-144 303-167 13. API Number 50- 029-21809-01-00 14. Well Number PBU 07 -33A ~ 15. Field and Pool ;; Prudhoe Bay Field 1 Prudhoe Bay Pool 16. Lease Designation and Serial No. ADL 028308 17. Land Use Permit: 20. Thickness of Permafrost 1900' (Approx.) AMOUNT PULLED PACKER SET (MD) 9942' AMOUNT & KIND OF MATERIAL USED IBP Set, Then Pushed Downhole Set Whipstock \)Jé ,1-\1 CHOKE SIZE GAS-Oil RATIO Flow Tubing Casing Pressure CALCULATED --.. OIL-Bel Press. 24-HoUR RATE""" 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach s ar te s eet, I necessary). Submit core chips; if none, state IInonell. DEC 1 82003 . '~",I.rE~.>:b~:~'F 1û G~ ~ ~ ;¿¡~~!} . ~ EJi) ~ L ~ c¡j) 1FlD OJ Form 10-407 Revised 2/2003 GAs-McF W A TER-BBl Oil GRAVITY-API (CORR) Alaska Oil & Gas Cons. Commission Anchorage 28. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 10362' 8373' None Shublik 10404' 8408' Sadlerochit 10470' 8462' Zone 1 B 11065' 8913' RECEIVED DEC 1 82003 Alaska Oil & Gas Cons. Commission Anchorage 30. List of Attachments: Summary of Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble Title 198-144 303-167 Technical Assistant Date l::t/IB/œ PBU 07 -33A Well Number Permit No.1 A roval No. INSTRUCTIONS Prepared By Name/Number: Drilling Engineer: Terrie Hubble, 564-4628 Dan Kara, 564-5667 GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 2/2003 OQ!GINAL Well: Field: API: Permit: Date 07-33B Prudhoe Bay Unit 50-029-21809-02 203-112 Accept: Spud: Release: Rig: 1 0/26/03 1 0/28/03 11 106103 Nordic #2 .'..'..'.'.".'.W ^,^,.".,.."..,.".,., W"^,W".'^W.W""'.MW'.' ..., "."MW-'.W..."..'^'.".W..,^",,^,'wwWWwW."'W.""'.'"w,,'.."." w,..,.w.",. '. ..--.""..,."""..",w.. '..ww" . ..H"'....'....'..W',., ,..."....' .."", PRE-RIG WORK 07/24/03 DRIFT WI 2.5 DUMMY GUN INTO LINER DOWN TO 10813' SLM (UNABLE TO GET DEEPER I TARGET DEPTH 10850'). RAN 2.55 CENT, l' STEM, AND 2.50 IMPRESSION BLOCK DOWN TO 10872' SLM. RAN 2.5 DUMMY GUN TO 10813' SLM WORKED DOWN TO 108701 SLM. (WORKED AREA @ 108131 SEVERAL TIMES BEFORE BEING ABLE TO DRIFT CLEANLY @ 80' PER MIN DOWN TO 10870' SLM). RDMO I LEFT WELL SHUT IN. 08/08/03 DRIFT & TAG LINER TOP WI 4.5 CENT @ 10,0531 SLM. (NO PROBLEMS) 08/21/03 RAN TUBING PUNCH AND STRING SHOT TO PREP FOR CHEM CUT. TUBING PUNCH FROM 10007 -10009. STRING SHOT FROM 10021' - 10033'. CORRELATED TO SWS LDL DATED 5/7/01. 08/22/03 CHEMICAL CUT TUBING @ 10032', IN THE MIDDLE OF THE FIRST FULL JOINT ABOVE THE LINER TOP. DEPTH CORRELATED TO SWS LDL 5/7/01. EVEN WEAR ON CUTTER INDICATED GOOD CUT. WELL SHUT IN AND READY FOR CIRC-OUT. 08/23/03 TIIIO 600/600/40. CIRC OUT PRE-CTD (WELL SII UPON ARRIVAL). SPEAR IN WI 5 BBLS MEOH, FOLLOWED BY 1063 BBLS OF 1% KCL WATER, FOLLOWED BY 5 BBL METH SPACER, FOLLOWED BY 150 BBlS DIESEL. LINE UP TO U-TUBE. 08/24/03 START U-TUBE T X IA. FREEZE PROTECT FLOWLINE WI 10 BBL METH SPEAR FOLLOWED BY 91 BBLS CRUDE WI 2 BBLS METH BEHIND. FINAL WHP'S 010/0. 08/29/03 TIO= VACNACNAC. TX IA FLS (CTD PREP). TBG, IA & OA FLS ARE NEAR SURFACE. 09/21/03 TIIIO = SINAC/O. TBG AND IA FL'S. (PRE CTD). IA FL NEAR SURFACE. UNABLE TO SHOOT TBG FL. NO WELLHOUSE OR SCAFFOLDING. MASTER IS SI WITH LOCKED OUT. 09/23/03 TIIIO = O+NAC/VAC. TBG FL @ NEAR SURFACE. (RWO) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 10/15/2003 10/16/2003 10/17/2003 10/18/2003 Page 1- BP Operations Summary Report 07 -33 07-338 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 06:00 - 10:00 From - To Hours P 10:00 - 12:00 12:00 - 14:00 14:00 - 15:00 15:00 - 20:00 20:00 - 22:45 22:45 - 23:00 23:00 - 00:00 00:00 - 01 :00 01 :00 - 01 :30 01 :30 - 07:00 07:00 - 09:00 09:00 - 18:00 18:00 - 18:30 18:30 -19:30 19:30 - 22:30 22:30 - 23:30 23:30 - 00:00 00:00 - 02:30 02:30 - 04:00 04:00 - 06:00 06:00 - 06:30 06:30 - 00:00 00:00 - 01 :00 01 :00 - 05:00 05:00 - 06:30 06:30 - 09:00 09:00 - 09:45 09:45 - 11 :00 Task Code NPT 4.00 MOB 2.00 MOB 2.00 MOB 1.00 MOB 5.00 MOB 2.75 MOB 0.25 MOB 1.00 MOB 1.00 MOB 0.50 MOB 5.50 MOB P P P P P P P P P P 2.00 RIGU 9.00 RIGU P P 0.50 RIGU P 1.00 BOPSUF P 3.00 BOPSUF P 1.00 BOPSUF P 0.50 BOPSUR P 2.50 BOPSUR P 1.50 BOPSUR P 2.00 BOPSUR P 0.50 BOPSUF P 17.50 BOPSUF P 1.00 BOPSUF P 4.00 BOPSUF P 1.50 BOPSUF P 2.50 BOPSUF P 0.75 PULL P 1.25 PULL P Phase PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE PRE DECOMP DECOMP Start: 10/15/2003 Rig Release: 11/6/2003 Rig Number: N2 Spud Date: 5/18/1988 End: 11/6/2003 Description of Operations Back rig off well L1-15A. Prep for rig move. Notice spill on pad. ( IR# 2003-IR-649812) Lower derrick. Continue to rig down. PJSM for rig move. Move rig to DS-7. Line up with well head on matting boards. PJSM to raise derrick. Raise derrick. Scope up derrick. Pull over well. Continue to RU. Spot cuttings box. RU hard line to tiger tank. RU choke and kill lines. RIG ACCEPT at 03:30. Pull BPV. Prep to blow down CT, position injector on rig floor. Pull CT over to rig floor, stab injector, cut coil, install CTC. RU hardline to blow down CT into tiger tank. PT same. Circulate & displace .CT with 2% KCI. RU N2 pumpers. PJSM. Pump N2. Cut coil, remove CTC. Unstab & pull CT back to reel, secure CT. Drop reel. PT lines in cellar. PJSM for well kill Kill well with 2% KCL 5 bpm @325 psi. One full circulation Monitor well slight flow. Well out of balance. U tube well. A little oil and diesel strung out due to holes in tubing. Pull tree cap and blow down lines. Set BPV. Bleed off control lines. RD choke and kill lines. NO tree. Set BPV. Install FMC Blanking plug 5.5 turns. NU 11" x 13-5/8" DSA, 13-5/8" x 11" drilling spool & position 11" BOP stack in cellar. (Spacer spool used to remedy interference of FMC blanking plug w/ lowest set of rams) Tech limits, PJSM. NU 11" BOPE. This is the 1st time to NU this BOP stack, requiring extra time to dress. Riser is a tight fit with the DSA and extra drilling spool. BOPE top down: Annular, Shaffer double gate, flow cross, Hydril single gate 5-1/2" pipe rams. RU hydraulic control lines. Cut hole in test joint. Mu test joint. Continue to NU 11" BOPE. Test BOPE. Witnessing of test waived by John Crisp AOGCC. 00:50 hrs 10-18-03. RD floor. Prep to pull blanking plug. Pull FMC blanking plug. RU lubricator. Pull BPV. RD Lubricator. (NB: Floor hand noticed slow leak on IAflange, tightened studs which were relatively loose and leak stopped. Good catch by floor hand while walking around cellar.) Back out LOS. PU landing jt. MU into tubing hanger, unseat hanger. PU, up wt= 150K, slack off= 135K Ibs. Monitor well, u-tubing up backside. RU to circulate down tubing and displace freeze protect fluid on backside. 5bpm, 1500psi on pumps. (much higher press than we saw yesterday on pumps, check pumps, pumps look good.) Pump press gradually dropped down to 250psi. PU wt dropped off to 10K at some point after pumping started. Hmm. PU again, up wt = 150k, slack off= 135K. Looks like we are free. Printed: 11/1212003 11 :02:42 AM BP Page 2 .. Operations Summary Report Legal Well Name: 07 -33 Common Well Name: 07-338 Spud Date: 5/18/1988 Event Name: REENTER+COMPLETE Start: 1 0/15/2003 End: 11/6/2003 Contractor Name: NORDIC CALISTA Rig Release: 11/6/2003 Rig Name: NORDIC 2 Rig Number: N2 Date From - To Hours Task Code NPT Phase Description of Operations 10/18/2003 11:00 -13:30 2.50 PULL P DECOMP Circulate the long way. 8bpm, 250psi on pumps. Returns cleaned up after a few minutes. Pump 1.5 x tubing volume to chemical cut, approx 1000bbls. Load Camco Spooler, secure same on rig floor. Monitor well, no flow. 13:30 - 14:00 0.50 PULL P DECOMP LD Tubing hanger. 14:00 - 18:00 4.00 PULL P DECOMP Pull 5-1/2" 17" LTC tubing. LD 30jts by 18:00. 18:00 - 21:00 3.00 PULL P DECOMP PJSM. Install thread protectors on 30 joints and remove from pipe shed. Clear ice from derrick. 21 :00 - 00:00 3.00 PULL P DECOMP Continue to LD tubing to SSSV. 57 of 59 bands recovered. 10/19/2003 00:00 - 06:00 6.00 PULL P DECOMP Continue to LD 5-1/2" LTC tubing. LD 165jts at 06:00. 06:00 - 06:30 0.50 PULL P DECOMP PJSM. 06:30 -11:30 5.00 PULL P DECOMP Continue LD 5-1/2" LTC tubing. Recover 251-1/2 jts. of 5-1/2" tubing and 1 addtional band for a total of 58 of 59 bands. Chemical cut is clean, 00= 5.53" , length = 19.12'. 11:30 -15:00 3.50 BOPSUF P DECOMP Set test plug, drain stack. Changeout 5-1/2" Hydril rams for 3-1/2". Test plug leaked. Simops: Change out horses head in reel house. 15:00 - 16:00 1.00 BOPSUF N RREP DECOMP Pull FMC test plug, replace seal element, drain stack, re-run test plug. Failed 2nd time to test. 16:00 - 17:00 1.00 BOPSUF P DECOMP Load pipe shed with 3-1/2" WTS 6 Work string. PT Bottom set of 3-1/2" rams and top set of variables. Pull test plug. 17:00 - 22:00 5.00 BOPSUF P DECOMP Change seals on test plug and retest.Get test on lower and variable rams. 22:00 - 00:00 2.00 BOPSUF P DECOMP Continue to load drill pipe into pipe shed. 10/20/2003 00:00 - 04:00 4.00 CLEAN P DECOMP Continue to load DP into pipe shed and tallying pipe. 04:00 - 05:30 1.50 CLEAN P DECOMP Load XO and floor valve. Install wear ring. Load 5.5" tubing & thread protectors onto truck for return to stores. 05:30 - 06:00 0.50 CLEAN P DECOMP Conitinue loading pipe shed with 3-1/2" WTS 6 work string. 06:00 - 06:30 0.50 CLEAN P DECOMP PJSM 06:30 - 10:30 4.00 CLEAN P DECOMP Load pipe shed with 4-3/4" DC's, finish tubing tally and PU Baker tools to rig floor. 10:30 - 12:00 1.50 CLEAN P DECOMP PU kelly swivel and stand back kelly. 12:00 - 12:30 0.50 CLEAN P DECOMP PJSM 12:30 - 13:30 1.00 CLEAN P DECOMP MU BHA #1: Casing scraper / overshot run. 13:30-15:00 1.50 CLEAN P DECOMP PU 6x 4-3/4" spiral DC's 15:00 - 20:00 5.00 CLEAN P DECOMP RIH with BHA #1 on 3-1/2" WTS 6 workstring. 20:00 - 21 :30 1.50 CLEAN N RREP DECOMP Upper air boot failed. Attempt to replace. NO GO. Pack it off with silicone and soft line. Using trash pump to keep fluid level below the boot until the silicon set up. 21 :30 - 00:00 2.50 CLEAN P DECOMP Continue to RIH. 1 0/21/2003 00:00 - 00:30 0.50 CLEAN P DECOMP Continue to RIH, 155 joints. Identify asphaltenes and pariffin in returns. 00:30 - 01 :00 0.50 CLEAN P DECOMP Reverse circulate, bottoms up @ 4bpm, 760 psi. 01 :00 - 06:30 5.50 CLEAN P DECOMP Continue to RIH. 06:30 - 07:30 1.00 CLEAN P DECOMP Hook-up standpipe, tighten connections on kelly hose. 07:30 - 08:30 1.00 CLEAN P DECOMP RIH with 3-1/2" WTS 6 work string. 08:30 - 10:00 1.50 CLEAN P DECOMP PU kellly on joint #311. 10:00 - 10:30 0.50 CLEAN P DECOMP Resume RIH with 3-1/2" WTS 6 work string. 10:30 - 12:40 2.17 CLEAN P DECOMP Tag at 10033'. (23' down kelly on jt #312) Up wt 107K, On wt 75K. Pu and rotate, 90K string wt rotating @ 70RPM (210Amps), 3bpm, 380psi. Rotate over stub and dress, swallow 9' and call it good. Never saw it pressure up but did see 2500 Ib overpull twice when PU while dressing the stub. Printed: 11/1212003 11:02:42AM BP Page 3 8IÞ Operations Summary Report Legal Well Name: 07 -33 Common Well Name: 07-338 Spud Date: 5/18/1988 Event Name: REENTER+COMPLETE Start: 10/15/2003 End: 11/6/2003 Contractor Name: NORDIC CALISTA Rig Release: 11/6/2003 Rig Name: NORDIC 2 Rig Number: N2 Date From - To Hours Task Code NPT Phase Description of Operations 10/21/2003 10:30 - 12:40 2.17 CLEAN P DECOMP Wanted to see no-go with 10.7' swallowed but did not want to mill down to get there. 12:40 -16:15 3.58 CLEAN P DECOMP PU 15' above tag and reverse circulate 100k LSRV pill to clean wellbore. Initial 7.0 BPM, 2800 psi. Final 7.0 BPM; 2300 psi. Fair amount of paraffin and dark silty debris. 16:15 - 16:45 0.50 CLEAN P DECOMP Retag dry 10042'. Clean in and out. 16:45 -18:00 1.25 CLEAN P DECOMP Standback kelly. 18:00 - 00:00 6.00 CLEAN P DECOMP POH LD PH-6 DP. 10/22/2003 00:00 - 08:30 8.50 CLEAN P DECOMP Continue to POH and LD 3.5" DP. 08:30 - 12:00 3.50 CLEAN P DECOMP LD BHA. Recovered one SSSV band. Boot baskets full of paraffin/asphaltene/silt and moderate amount of metal. Inside of overshot contained about a foot of paraffin/asphaltene (probably from debris external to tubing stub - we tagged dry twice and did not circulate again). Cutrite inside overshot had wear to 6-1/4" 00 - not really telling us anything here since we were spinning. Overshot gaged to 5-9/16" 10 (5-5/8" tool would not pass through). 12:00 - 13:00 1.00 RUNCO~ rP CaMP PJSM .Pull wear ring, and set test plug. sim ops while continueing to load pipe shed. 13:00 - 14:30 1.50 RUNCO~ ~ COMP Load pipe shed while drifting and strapping tubing. 14:30 -15:30 1.00 RUNCor If> COMP PJSM with PEAK to lift casing equipment to rig floor with crane. Lift equipment per plan. 15:30 -17:30 2.00 RUNCO~ If> CaMP Continue to load pipe shed. Sim ops Change out lower pipe rams and PU 4-1/2" test joint. 17:30 - 18:30 1.00 RUNCO~ If> CaMP Continue to load pipe shed. Sim ops Test rams to 3500 psi. O.K. 18:30 - 00:00 5.50 RUNCO~ If> COMP Continue to load pipe shed. Sim ops RU stabbing board, Install long bails, load GLM and completion equipment. 10/23/2003 00:00 - 04:30 4.50 RUNCO~ If> COMP Continue to load pipe shed while sim ops RU floor for the casing crew. 04:30 - 05:00 0.50 RUNCO~ rP COMP PJSM running completion. 05:00 - 05:30 0.50 RUNCO~ ~ COMP Run 4.5" 13% Cr completion. 05:30 - 07:00 1.50 RUNCO~ ~ COMP Tech limit and pre-job meeting with day crew. 07:00 - 18:00 11.00 RUNCO~ ~ COMP Run 4.5" 13% Cr completion. 18:00 - 00:00 6.00 RUNCO~ rt.J WAIT COMP Placed casing crew on standby to allow rest. They had worked 16 hours and all backup casers were commited to other operations. Clean rig. Remove excess thread protectors from floor. 1 0/24/2003 00:00 - 00:30 0.50 RUNCO~ ~ CaMP PJSM with casing crew. Restart of operation with crew changeout. 00:30 - 07:00 6.50 RUNCO~ /P COMP Continue to run 13% Cr completion. 16-18 jts per hour. 07:00 - 10:00 3.00 RUNCO~ fP COMP Wt chk above tubing stub 921</71 k. Hook-up head pin. Est circ at 2.0 BPM; 50 psi. RIH and lost/regained a little weight at 10030' and then sat down solid at 10035'. No change in circ pressure. Increase rate to 3.0 BPM; 80 psi. Repeat - same bobble and set down depths with no pressure response. Orient pipe 2-1/2 turns (net 1-3/4). Set down same spots - no pressure change. Orient again. Same results. Set about 1-2k down; rotate 5 turns (net 3-1/2). Slack off, but no further progress downhole. Repeat no change. 10:00 - 10:45 0.75 RUNCO~ ~ CaMP Space out wih pups for comfortable slickline working height and to be 2' shallow to stack-out depth. 10:45 -11:00 0.25 RUNCO~ (P COMP Safety meeting with wireliners. Printed: 11/1212003 11 :02:42 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 10/24/2003 10/25/2003 From - To Hours 11 :00 - 17:30 17:30 - 21 :30 21 :30 - 23:00 23:00 - 23:30 23:30 - 00:00 00:00 - 05:00 05:00 - 06:15 06:15 - 07:00 07:00 - 07:30 07:30 - 07:45 07:45 - 08:00 08:00 - 09:15 09:15 -11:30 11:30-12:15 12:15 - 12:45 12:45 -18:00 18:00 - 22:30 22:30 - 23:00 23:00 - 00:00 Page 4 - BP Operations Summary Report 07 -33 07-338 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 Task Code NPT 6.50 RUNCO~'" 4.00 RUNCO~rN 1.50 RUNCO~ft-.J 0.50 RUNCO~fP 0.50 RUNCO~fP 5.00 RUNCO~~ 1.25 RUNCO~ P 0.75 RUNCO~ P 0.50 RUNCO~ P 0.25 RUNCO~ P 0.25 RUNCO~ P 1.25 RUNCO~ P 2.25 RUNCO~ P 0.75 RUNCO~ip 0.50 RUNCO~ ip 5.25 BOPSUF P 4.50 BOPSUF P 0.50 BOPSUF P 1.00 BOPSUF P Phase DPRB CaMP DPRB COMP DPRB COMP COMP COMP CaMP COMP COMP CaMP COMP CaMP COMP COMP COMP COMP COMP CaMP COMP WEXIT Start: 10/15/2003 Rig Release: 11/6/2003 Rig Number: N2 Spud Date: 5/18/1988 End: 11/6/2003 Description of Operations RU slickline. RIH and latch RHC sleeve at 9977' SLM. POOH. RIH with 3.70" x 11' drift. Tag 10042' SLM. Depths suggest we are likely tagging at the top of the tubing stub and the tubing stub is swallowed inside the overshot. Sticky on PU -- also believable with the quantity of paraffin seen inside the overshot from the dressing run. Work drift to 10050', sticky on each PU. POOH. RIH with 3.50" x 10' drive down bailer. Tag 10062'. Beat down four times and fell through to 10082' (top of 3-1/2" deployment sleeve). POOH. Bailer nearly fully packed with a mix of a gritty substance that feels like fine sand and paraffin, ashphaltenes, rubber, metal. MU PDS memory GR/CCUcaliper. Log well. POH. Down load data. Log shows Overshot 3' over stub. RIH and set RHC plug. PJSM for well displacement to inhibited seawater. Reverse circulate 3 bpm. 50 bbl Hi Vis, 300 bbl140 degree seawater. 400 bbl140 degree inhibited seawater. Reverse circulate hi vis pill 50 bbls, 300 bbls of 140 deg seawater, 400 bbl inhibited 140 deg seawater with 25 gal/100 bbl Corexit corrosion inhibitor; 3bpm at 240 psi. Retag to confirm spaceout. No Change. Space-out and land hanger, leaving overshot 2' above no go. RILDS. RD tubing running equip. Close bag on LJ. PT body seals on hanger from above by pressuring stack thru kill line to 3500 psi -- no leak past body seals. RU HBR on IA. Safety meeting. Reverse 140 bbls crude for FP at 3.0/1250. Drop ball/rod. IA = 180 psi. Pressure tubing to 3480 psi (lAP = 250) to set packer and test tubing. Lost 50 psi to 3430 psi in 30 minutes. No change in lAP. Bleed tubing to 1500 psi. Pressure test IA as follows: Time (min) Tubing P lAP OAP ---------------- --------- ----- ----- Initial Pressure-up IA 0 15 Re-pressure IA 0 15 30 1520 200 65 2060 2030 3400 3115 450 405 2080 2040 2030 3450 3220 3175 450 395 375 Bleed pressures. RD HBR. Use Dowell crane to remove Nabors tongs and handling equipment from floor. LD landing joint. Set TWC. NO BOPE. NU and test tree. PJSM for stack installation. NU 7" BOPE. { annular, blinds, 2" combi, cross, 2-3/8" combi, Printed: 11/12/2003 11 :02:42 AM BP Page 5 - Operations Summary Report Legal Well Name: 07-33 Common Well Name: 07-338 Spud Date: 5/18/1988 Event Name: REENTER+COMPLETE Start: 10/15/2003 End: 11/6/2003 Contractor Name: NORDIC CALISTA Rig Release: 11/6/2003 Rig Name: NORDIC 2 Rig Number: N2 Date From - To Hours Task Code NPT Phase Description of Operations 10/25/2003 23:00 - 00:00 1.00 BOPSUF P WEXIT 2" combi) 10/26/2003 00:00 - 02:00 2.00 BOPSUF P WEXIT NU 7" BOPE. (-1 hour daylight savings time applied) 02:00 - 08:00 6.00 BOPSUF P WEXIT Test 7" BOPE. Witnessed by Jeff Jones AOGCC representative. 08:00 - 09:00 1.00 BOPSUF P WEXIT Pull TWC. 09:00 - 10:00 1.00 RUNCO~ P COMP Clear pipe shed of extra tubulars. 10:00 - 14:30 4.50 RUNCO~ P COMP RU slickliners. Safety meeting. Latch and pull ball/rod from 9974' SLM. POOH. Latch and pull RHC sleeve from 9978' SLM. POOH and RD slickline. 14:30 - 15:30 1.00 BOPSUF P WEXIT PU injector. Change packoff. 15:30 -17:30 2.00 BOPSUF P WEXIT Stab pipe. 17:30 - 23:00 5.50 BOPSUF N SFAL WEXIT Reverse to fill coil. Pump at 3.5 bpm 4800 psi for slack management. Slack management to include pumping suffient cable out of reel to allow attachment of cable to bulkhead. Unable to get cable to move by reversing. Circulated 3.5 bpm wire and got some movement. Try reversing again. NO GO. Decision made to swap reels. 23:00 - 00:00 1.00 BOPSUR N SFAL WEXIT Blow down reel with nitrogen. 10/27/2003 00:00 - 01:15 1.25 BOPSUR N SFAL WEXIT Continue to blow down reel with N2. 01:15 - 01:30 0.25 BOPSUR N SFAL WEXIT PJSM. for pulling CT back to reel. 01 :30 - 02:00 0.50 BOPSUF N SFAL WEXIT Pull CT back to reel and secure. 02:00 - 06:30 4.50 BOPSUR N SFAL WEXIT Perform reel swap. RU hard lines to reel. Restring cables to pull coil to injector. 06:30 - 06:45 0.25 BOPSUR N SFAL WEXIT Safety meeting. 06:45 - 08:00 1.25 BOPSUF N SFAL WEXIT Pull coil to injector; stab pipe. 08:00 - 09:00 1.00 BOPSUF P WEXIT Man down/rig evacuation drill. 09:00 -10:15 1.25 BOPSUF N SFAL WEXIT Install Roll-on CTC. 10:15 - 12:15 2.00 BOPSUF N SFAL WEXIT Fill coil with 160 deg water at 0.5 BPM. 12:15 - 13:45 1.50 BOPSUF P WEXIT Reverse to add slack into the cable. Cut back 35' to find cable. 13:45 -16:15 2.50 STWHIP P WEXIT Install CTC. Install E-head. Pull test. Pressure test. 16:15 - 17:00 0.75 STWHIP P WEXIT MU clean-out BHA -- full drilling package, Weatherford motor, 2.74" 00 parabolic diamond mill. 17:00 - 19:00 2.00 STWHIP P WEXIT RIH with circ sub open, pumping 2.7 BPM; 4000 psi to shift slack forward. RIH to 10,000 with out pump. Circulate .5ppb bio at 2.3 bpm and 3700 psi. RIH to 10,850'. No Problem. 19:00 - 19:30 0.50 STWHIP P WEXIT Circulate 2.5 3,450 psi. 19:30 - 21:00 1.50 STWHIP P WEXIT POH chasing 30 bbl 3#/bbl pill. 21:00 - 21:30 0.50 STWHIP P WEXIT LD bit and motor. 21 :30 - 22:00 0.50 STWHIP P WEXIT Make up whipstock setting assembly. 22:00 - 00:00 2.00 STWHIP P WEXIT RIH with whipstock setting assembly. 10/28/2003 00:00 - 00:45 0.75 STWHIP P WEXIT Tie -in. Correct depth (-3'). 00:45 - 01 :00 0.25 STWHIP P WEXIT RIH to 10,808.8' placing top of Whipstock at 10,800'. 01:00 - 01:10 0.17 STWHIP P WEXIT Orient 165 R. Close circulation sub and pressure to 2670 psi to shear off. Set Down 5K. No movement. 01 :10 - 03:00 1.83 STWHIP P WEXIT POH. Flag pipe at 10650 EOP. Continue to POH to surface. 03:00 - 03:45 0.75 STWHIP P WEXIT LD whipstock running tool and PU milling BHA: HCC diamond whipstock mill and diamond string reamer 03:45 - 05:45 2.00 STWHIP P WEXIT RIH. Correct depth to flag (-4') 05:45 - 11 :30 5.75 STWHIP P WEXIT RIH and tag TO whip (essentially the pinch point) at 10799.5' dry. FS = 1.7/2100. Time mill most of the window at about 0.1 - 0.2 ft every 15 minutes, seeing 100 - 200 psi MW each step. At 10803.7', got a spike in MW and weight loss -- may be bottom of window. Control mill, limiting MW to 400 psi and l' Printed: 11/1212003 11:02:42AM , . Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date Page 6- BP Operations Summary Report 07 -33 07-338 REENTER+COMPLETE NORDIC CALISTA NORDIC 2 From - To Hours Phase 10/28/2003 05:45 - 11 :30 11:30 -13:00 13:00 - 14:00 14:00 - 14:30 14:30 - 16:00 16:00 - 17:00 17:00- 19:10 19:10 - 19:20 - 0:00 10/29/2003 00:00 - 03:25 03:25 - 03:35 03:35 - 06:00 06:00 - 09:00 09:00 - 09:30 09:30 - 11 :30 11:30-12:00 12:00 - 13:30 13:30 -15:00 15:00 -16:50 16:50 - 17:30 17:30 - 18:00 18:00 - 20:00 20:00 - 20:25 20:25 - 22:25 22:25 - 23:00 23:00 - 00:00 10/30/2003 00:00 - 03:45 03:45 - 04:35 04:35 - 06:00 06:00 - 07:00 07:00 - 07:35 07:35 - 08:5 Task Code NPT 5.75 STWHIP P 1.50 STWHIP P 1.00 STWHIP P WEXIT WEXIT WEXIT 0.50 STWHIP P 1.50 STWHIP P 1.00 DRILL P 2.17 DRILL P 0.17 DRILL P 4.67 ILL P WEXIT WEXIT PROD1 PROD1 PROD1 PR 01 3.42 DRILL P PROD1 0.17 DRILL 2.42 DRILL 3.00 DRILL 0.50 DRILL 2.00 DRILL 0.50 DRILL 1.50 DRILL P P P P P P P PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 1.50 DRILL 1.83 DRILL 0.67 DRILL P P P PROD1 PROD1 PROD1 0.50 DRILL 2.00 DRILL P P PROD1 PROD1 0.42 DRILL P 2.00 DRILL 0.58 DRILL 1.00 DRILL PROD1 PROD1 PROD1 PROD1 0.83 ILL 1. DRILL .00 DRILL 0.58 DRILL 1.25 DRILL P P P P P PROD1 PROD1 PROD1 PROD1 PROD1 08: - 09:15 :15 - 09:25 09:25 - 09:45 09:45 -11:30 0.42 DRILL 0.17 DRILL 0.33 DRILL 1.75 DRILL P P P P PROD1 PROD1 PROD1 PROD1 Start: 10/15/2003 Rig Release: 11/6/2003 Rig Number: N2 Spud Date: 5/18/1988 End: 11/6/2003 Description of Operations WOB to 1200 lb. Calling bottom of window at 10805'. Drill formation from 1 0805' to 1 0815'. Dress window area. Dry pass through window without problems. Start swap to Flo-pro mud. Circulate new mud to surface. TOH UD window milling BHA and P/U bulid BHA TIH correct to flag TIH to 10790' Log tie-in -5" correction. ag ottom at p wn Irec lona y n build section f/ 10815' 1.4bpm, free-spin 2800psi 300psi M Toolface 170R. Slow drilling with frequent motor stalls. ahead following plan to 10860'. Continue drilling build section f/ 10860'. Better dri . 9 starting at 10877' and increase pump to 2.0bpm Free- n 3200 psi 600-700psi MW drilling 50'/hr Drill to 10941' Wiper trip to window. Continue drilling ahead with build se n. 0600 depth 11060' Fin drilling build/turn 1.8/3800/30- at 11160' Ream high DLS area POOH for lateral assy LD drilling BHA. Bit was -1-RO Pump back slack. C off 100' CT due to chrome tbg management. Re ad OS CTC. PT 3500, 30k Rehead BHI, BHA RIH w/ BH (1.1 deg motor) Log tie-i own from 10780', corr -7'. Log RA marker to tie into moth WB and found at 10807' R to bottom irectionally drill remainder of build section f/ 11160' to 11193' (8907'tvd). Continue drilling ahead with lateral @ 1.8 bpm 3300 psi FS ( 9.6ppg ECD) 300-400psi MW, 2k woe @ +/- 50'/hr ROP. Drilled to 11224'. Wiper trip to window. Stacked out 11143' p/u and went through okay. TF was at 120R. Continue drilling ahead f/ 11224' to 11332'. Starting to stackout. Wiper trip to 10825'. Continue drilling ahead f/ 11332'. Good weight transfer. 70-80'/hr w/ 1-2k wob. Drilled to 11407'. Continue directionally drilling ahead f/ 11407' @ 1.7bpm 3380psi free-spin 400-500psi MW. Drilled to 11541'. Wiper trip to 10830'. No problems at 11140' area. Drill ahead f/ 11541'. 1-2k wob 50-60'/hr. 0600 depth 11630'. Drill from 11630' 1.75/3600/80-120R to 11715' Wiper to window Drill from 11715' 1.9/4000/120L to 11823' and stacking from formation change and worn out mud. Inadvertnetly build angle when trying to hold at 8920' TVD Wiper to window Log tie-in to RA marker, add 4.0' RBIH-a little motor work thru 11140-180' Drill from 11823' 1.8/3750/120L to 11872' and stacking and seeing shale now on GR while dropping angle to hold at 8920' Printed: 11/1212003 11 :02:42 AM i" STATE OF ALASKA if ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon I-I Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1068' SNL, 522' EWL, SEC. 34, T11N, R14E, UM At top of productive interval 2952' SNL, 115' EWL, SEC. 26, T11N, R14E, UM At effective depth 3013' SNL, 5267' EWL, SEC. 27, T11N, R14E, UM At total depth 3065' SNL, 1735' EWL, SEC. 26, T11N, R14E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service X = 676720, Y = 5949869 X = 681504, Y = 5953380 X = 681378, Y = 5953315 X = 683127, Y = 5953306 6. Datum Elevation (DF or KB) RKB = 60' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 07-33A 9. Permit Number 198-144" 10. APl Number 50- 029-21809-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12761 feet 8931 feet 10885 feet 8805 feet Plugs (measured) Junk (measured) 2-1/8" Baker IBP at 10885' (04/03) Casing Structural Conductor Surface Intermediate Production Liner Liner Perforation depth: measured true vertical Length 110' 3365' 10413' 604' 2681' Size Cemented MD TVD 20" 2150# Poleset 13-3/8" 20o0 sx cs ,~, 200 sx cs ~, 600 sx G 9-5/8" 629 sx Class G, 400 sx CS I 7" 450 sx Class G 3-3/16" x 2-7/8" 140 sx LARC 11175'-11560',11771'-12251',12465'-12720' 8946'-8959',8954'-8945',8935'-8934' 110' 3365' 10413' 10166'-10770' 10081'-12759' 110' 3047' 8416' 8211' - 8713' 8141'- 8931' RECEIVED JUN ~. 9 2003 AiasJ(a Oi~ & Gas Co~s. Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 tubing to 10141'; 4-1/2", 12.6#, L-80 tu roan~0141' to 10259'., Packers and SSSV (type and measured depth) 9-5/8" x 5-1/2" Baker FB-1 packer at 10141" 5-1/2" Camco SSSV Nipple at 2223'. i3. Attacli~ents [] Description Summary of Proposal [] Detailed Operations Program [] BOP, Sketch ,, ,, 14. Estimated date for commencing operatign July 1, 2003 16. If proposal was verbally approved Name of approver 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Date Approved Contact Engineer Name/Numbec Dan Kara, 564-5667 Prepared By Name/Number: Sondra Stewman, 564-4750 17. I he~'~/,~.~fY that~tl:~~ true and correct to the best of my knowledge J Signed DanKara ~'L/~'''''"----' Title CT Drilling Engineer Date (.,,/I,EI/O~ J I ...... . .............. · ..........,.. .......... ..... .... ..... .................. .... ........ ~p.m~,..~.~n....,..'u.~:e...'..~n~ ........................................................ ... .... J Conditions of Approval: Notify Commission so representative may yvitness J i ,..1~ & ,_ ~ J ~' I Approval No ,.~ ~ m I ,e,~,~ m Plug integrity BOP Test ~ Location clearance i '--- -.- ......,~r m ANNE'PJUL0~,/~[~nicallntegrityTest Subsequent form required l0- o -, m ~,pproved by order of the Commission ,/i"~.',.,.-.--T..,-.,~..~ ,~--'z'-~'3'~-'Z.- ~ .... Commissioner Date '~'~'~'~f Fg'r~~[~'15'88~ ~ 0 ~j~, "/ 0 R IGI NAL Submit In Triplicate bp To.' Winton Aubert Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Danny Kara CTD Engineer Date: June 18, 2003 Re: CTD Tubing Swap and Sidetrack of Prudhoe Well 7-33B / Well 7-33A is scheduled for a through tubing sidetrack w.i,3h coiled tubing. Prior to CTD sidetracking, the 5-1/2" L-80 tubing will be replaced with 4-1/2" 13Cr-80 tubingf. The sidetrack, 7-33B, will kick off from a window milled off a mechanical whipstock. The lower Romeo Zone 1A will be the target for the sidetrack. The following describes work planned to prepare 7-33A for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed tubing swap and sidetrack is attached for reference. 1. Combo MIT tubing/inner annulus to 3500 psi. / 2. A retrievable/inflatable bridge plug is already set at 10885' md and pressure tested to 2000 psi. 3. Chemical cut tubing at -10085' md. ~- 4. RU Nordic 2 with 13-5/8" BOPE. Test stack. 5. Pull 5-1/2" L-80 tubing. 6. RIH w/casing scraper and dress off tubing stub. ~, ~[-~." 7. Complete well with 4-1/2" 12.6# 13Cr-80 tubing with new packer and tubing tail overshot. 8. PT completion. RD 13-5/8" BOPE. NU tree and 7-1/16" CTD BOPE. Test. ~ 9. Install whipstock in 3-3/16" liner at 10800'. 10. Continue forward with CTD window milling and open hole drilling. ..~ We would like to begin the prep work operations by July 01, 2003. Please let me know if I can provide you with additional information. Dan Kara CTD Drilling Engineer CC: Well File Terrie Hubble TRE = FMC GEN 4 WELLHEAD = FMC ;~'~';~"fGi~~'L-'' ............ ............................................................ KOP = 1400' ................................................................ ~tum MD = 10961 I13-3/8" CSG, 72#, L-80, ID = 12.347" H 3365' Minimum ID = 2.44" @ 11289' 3-3/16" X 2-718" XO 07-33A ITOP OF 3-1/2" LNR 10085' 10085' 5-1/2" TBG-IPC, 17#, L-80, .0232 bpf, ID = 4.892" Id 10141' 10141' .i"YNOTES: 70° @ 11074' 2223' I--~ 5-1/2" CAMC..Z) BAL-O SSSV NIP I 9-5/8" X 5-1/2" BAKER FB-1 PKR W/BKR SEALBORE EXT, XO, BKR MILLOUT EXT. ITOPOF4'I/2"TBG I-t ~0~e0' ~0~e0' I-[ 5'1/2"x4-1/2"xoI ITOPOF 7" LNR Id 10166' ]4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID= 3.958" Id 10259' ,o2~' I-I 4-1/2"WLEGI I9.5/8'' csg' 47#' L'80, ID= 8'681,' I'"1 10413' I 3-1/2"LNR, 9.3#,L-80,.0087bpf, ID:2.992"H ~os~' I ~os~2' I-t 3'1/2"x3-3/16"x°.'D=2-8°"l ITo, o, ~-~,1~" .~. I-t ~0~' ~0~..' H ~-1,~" ~^.~,~. ~S~T o~,,9,o~ ITOP OF WHIPSTOCK I-'1 10767' / PUSHED DOWN HOLE (04/06/03) I MILLOUT WINDOW:10773' I 11289' I'"'~ 3-3/16"X 2-7/8" XO, ID = 2.44" I I 7" LNR, 29#, L-80, .0371 bpf, ID = 6.184" Id 11027' ~sss' H O.ST..CT,O. I PERFORATION SUMMARY REF LOG: MCNL ON 10/21/98 ANGLE AT TOP PERF: 80 @ 11175' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/8" 4 11175- 11355 O 03/06/00 2" 4 11340 - 11560 O 10/22/98 2" 4 11771 - 12251 O 10/22/98 2" 4 12465- 12720 O 10/22/98 I TOP OF 2-7/8" LNR Id 11291' 12725' I 2-7/8" LNR, 6.5#, L-80, .00579 bpf, ID = 2.441" 12759' DATE REV BY COMMENTS DATE REV BY COMMENTS 1988 ORIGINAL COMPLETION 04/06/03 JJ/KAK PULL POGLMS; PUSH IBPDH 10/25/98 SIDETRACKED (07-33A) 03/06/01 SIS-MD FINAL 02/05/02 RN/TP CORRECTIONS 12/11/02 TWC/tlh MIN ID, XO, IBP CORRECTIONS 03130103 JAFFFLH PULL POGLM PRUDHOE BAY UNIT WELL: 07-33A PERMIT No: 1981440 APl No: 50-029-21809-01 SEC 34 T11N R14E 3543.46 FEL 3065.86 FNL BP Exploration (Alas ka) · TREE = ' FMC GEN 4 WELLHEAD = FMC ACTUATOR = AXELSON KB. ELEV = 60' BF. ELEV = __.? KOP = 1400, MaxAngle= 95@ 11885' Datum MD = 10961' Datum TVD = 8800' SS 13-3/8" CSG, 72#, L-80, ID = 12.347" ~ 3365' 14-1/2" TBG, 12.6#, CR, .0152 bpf, ID= 3.958" 10050' Chem Cut 5-1/2" I--~ 10085' TOPOF 3-1/2" LNRI~ 10085' 07-33B Proposed RWO/CTD Sidetrack J'Y NOTES: 70° @ 11074' 2200" I--~ 4-1/2" x NIP, ID = 3.813" Gas Lift Mandrels lO141' 9900' Iq4-1/2" X NIP, ID= 3.813"I 9950' I'-t 9-5/8" X 4-1/2" PKR 10000' 1_~4-1/2" x NIP, ID= 3.813"I 10050' 1_15-1/2" Oversr, ot I 10085' Id 3-1/2" DEPLOYMENTSLV, ID= 3.0" I 10141' I~ 9-5/8"X5-1/2" BAKERFB-1 PKRW/BKR / SEALBORE EXT, XO, BKR MILLOUT EXT. ITOP OF 4' I /2" TBG Id 10160' ITOPOF 7" LNR Id 10166' 10160' I--~ 5-1/2"X4-1/2"XOI 14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" Id 10259' 10259' Id 4-1/2"WLEGI I 3-1/2" LNR, 9.3#, L-80, .0087 bpf, ID = 2.992" Id TOP OF 3-3/16" TOP OF 2-3/8" LNR Top of Cement I TOP OF WHIPSTOCK Id 10413' 10533' 10533' 10700' 10700' 10767' 10520' Id Liner Top Pkr (if necessary) ' o53:' I-t MILLOUT WINDOW: 10773' I I 7"LNR, 29#,L-80,.0371bpf, ID=6.184" I-I 11027' I 3-3/16" LNR, 6.2#, L-80, .0076 bpf , ID = 2.80" 11291' I TOP OF 2-7/8" LNR · , PERFORATION SUMMARY REF LOG: MCNL ON 10/21/98 ANGLE AT TOP PERF: 80 @ 11175' :Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE ~ 2-1/8" 4 11175- 11355 isolated proposed 2" 4 11340 - 11560 isolated proposed 2" 4 11771 - 12251 isolated proposed 2" 4 12465- 12720 isolated proposed 2-3/8" cmt'ed and perfed Id 12600' I 10800' 10885' 11289" 11555' 12759' DATE REV BY COMMENTS DATE REV BY COMMENTS , 1988 ORIGINAL COMPLETION , 04/06/03 JJ/KAK I::~LL POGLMS; PUSH IBP DH 10/25/98 SIDETRACKED (07-33A) 03/06/01 SIS-MD FINAL 02/05/02 RN/TP CORRECTIONS 12/11/02 TWC/tlh MIN ID, XO, IBP CORRECTIONS 03/30/03 JAF/TLH PULL POGLM Mechanical Whipstock 2-1/8" BAKER IBP (SET 06/29/01 ) PUSHED DOWN HOLE (04/06/03) 3-3/16" X 2-7/8" XO, ID = 2.44" OBSTRUCTION PBTD I 2-7/8" 6.5#, L-80 liner I PRUDHOE BAY UNIT WELL: 07-33A PERMIT No: 1981440 APl No: 50-029-21809-01 SEC 34 T11N R14E 3543.46 FEL 3065.86 FNL BP Exploration (Alaska) Nordic 2 workover BOP stack 13 5/8" annular preventor Choke line HCR valve 5~8" BOP [~~, 3-1/2" pipe ram [-~~1:= blind ram 13 5~8" BOP Kill line HCR valve r-----~ 2 7/8,, x 5,, VBR · p~pe ram 11" tubing head MOJ 5~8~03 Well Compliance Report File on Left side of folder 198-144-0 PRUDHOE BAY UNIT Roll gl: Start: Stop Roll #2: MD 12761 TVD 08931 Completion Date: 07-33A 50- 029-21809-01 Start Stop 10/25/98 Completed Status: 1-OIL BP EXPLORATION (ALASKA) rNC Current: Name Interval D 8813 1 SCHLUM MNCL ' CH 11/5/98 D 9113 1-8 SPERRY GR PB2 OH 4/6/99 D 9114 1-6 SPERRY GR PB1 OH 4/1/99 D 9115 1-14 SPERRY GR OH 4/6/99 D CCL/GR FINAL ~/PDS 9932.5-11553. CH 3/17/00 L GLS/BHP FINAL v/50-10900 10/28/99' CH 5 11/17/99 L MCNL FINAL ~/9995-12723 CH 2 11/5/98 L NGP-MD FINAL ,40775-12540 PB1 OH 4/6/99 L NGP-MD FINAL ~/10775-12761 OH 4/6/99 L NGP-MD FINAL v~0775-11838 PB2 OH 4/6/99 L NGP-TVD FINAL ~8664-8871 OH 4/6/99 L NGP-TVD FINAL 4'8664-8911 PB2 OH 4/6/99 L NGP-TVD FINAL,/8664-8868 PBI OH 4/6/99 R SRVYRPT v/SPERRY 10700-12540. PB1 OH 12/9/98 R SRVYRPT "/SPERRY 11055.23-11838. PB2 OH 12/9/98 R SRVY RPT ,/SPERRY 11416.96-12761. OH 12/9/98 Daily Well Ops Are Dry Ditch Samples Required? yes Was the well cored? yes ~) Analysis Description Received? yes~o Comments: Sent Received T/C/D · 11/6/98 4/6/99 4/6/99 4/6/99 3/17/00 11/23/99 11/6/98 D 4/6/99 D 4/6/99 D 4/6/99 D 4/6/99 4/6/99 4/6/99 12/17/98 12/17/98 12/17/98 And Received? yes no Sample Set # Wednesday, November 08, 2000 Page 1 of 1 " '¢' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate _ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other_ 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) ARCO Alaska, Inc. Development__X RKB 60 feet 3. Address Exploratory__ 7. Unit or Property name P. O. Box 100360 Stratigraphic__ Anchorage, AK 99510-0360 service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 1066' FNL, 4757' FEL, Sec. 34, T11 N, R14E, UM (asp's 676720, 5949869) 07-33A At top of productive interval 9. Permit number / approval number 2952' FNL, 5165' FEL, Sec.26, T11 N, R14E, UM (asp's 681504, 5953378) 198-144 At effective depth 10. APl number 50-029-21809-01 At total, depth 11. Field / Pool 3066' FNL, 3543' FEL, Sec. 26, T11N, R14E, UM (asp's 683127, 5953305) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 12761 feet Plugs (measured) Obstruction @ 11558' MD on 3/05/2000. true vertical 8931 feet Effective depth: measured 11558 feet Junk (measured) true vertical 8959 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 1 10' 20" 215o # Poleset 110' 1 10' Surface 3305' 13-3/8" 2ooo Sx cs III, 200 sx cs I, & 3365' 3047' 600 sx Class G Production 10353' 9-5/8" 629 Sx C~ass G & 400 Sx CS ~ 10413' 8416' Liner 604' 7" 450 Sx C~ass G 10770' 8713' Liner 2681' 3-1/2"/2-7/8" 30 bbls 15.8 ppg I_ARC 12762' 8931' Perforation depth: measured 11175' - 11560'; 11771' - 12251'; 12465' - 12720'. truevertica18946'-8959'; 8955'-8946'; 8935'-8934'. ~ ?~' ! ~. ! ~ 1''~'~'~'''~I'V~L~' 0 i ooo Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80 Tbg @ 10141' MD; 4-1/2", 12.5#, L-80 Tbg @ 1O259' MD. Packers & SSSV (type & measured depth) 9 5/8" X 5 1/2" BAKER FB-1 PACKER @ 10141' MD. 5-1/2" CAMCO BAL-O SSSV NIPPLE SSSV @ 2223' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Avera,qe Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 809 3812 316 281 Subsequent to operation 472 1321 272 - 299 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run ~ Daily Report of Well Operations _~X Oil __X Gas __ Suspended ~ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed -~ / ,r /""J" '"' ~ Title ARCO Engineering Supervisor Date Z/Z_/ ~' ._ ~__~ Prepared by Paul Rauf 263-4990 Er/n Oba Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE 07-33A DESCRIPTION OF WORK COMPLETED PERFORATING OPERATIONS Date Event Summary 2/23/2000: 3/03/2000: 3/04/2000: 3/05/2000: 3/06/2000: RIH & drifted to 11130' SLM (HAW). MIRU work platform & CTU#4. PT'd equip. Killed well w/Seawater. RIH & logged well. Performed FCO to 11567' but unable to go any further. POOH. RIH & milled to 11558' & laid in new FIo Pro. POOH. RIH w/ 2-1/8" perf guns & shot 180' of Add Perforations as follows: 11175'- 11355' MD (Zone 1) Reference Log: MCNL 10/21/1998. All shots @ 4 SPF, random orientation, 60° phasing, & overbalanced pressure. POOH w/ guns. ASF. RD. Placed 07-33A on production & obtained a valid welltest. Options for this well are currently being evaluated. APR 20 2000 ~ ~ (~s Cons, Commission .An~or~ Page 1 07-33A .~., DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 9/21/98: 9/22/98: 9/28/98: 9/29/98: 9/30/98: 10/01/98: 10/02/98: 10/03/98: 10/04/98: 10/05/98: 10/06/98: 10/07/98: 10/08/98: 10/09/98: 10/10/98: 10/11/98: 10/1 2/98: 10/13/98: 10/14~98: MIRU CTU & PT'd equip. RIH w/BHA & milled XN nipple to 3.8" ID @ 10246' MD. Tagged Whipstock @ 10767' MD. Milled window off Whipstock through the 7" liner to 10773' MD. Circulated Biozan & POOH w/BHA. RIH w/BHA & drilled into FM to 10780'. Reamed/backreamed window area & POOH. RD. MIRU CTU. N/U BOPE. Completed MIRU. PT'd BOPE to 3500 psi. Killed well. RIH w/BHA & tagged BTM @ 10784' MD. Displaced well to FIo Pro. Drilled to 10800'. Performed LOT to EMW of 9.5 ppg. Drilled to 10900' & POOH. RIH & drilled to 10950'. Drilled build section f/10950' to 11413' w/periodic short wiper trips to window. POOH. RIH & drilled to 11736'. POOH to repair small leak in CT. Completed POOH. Performed CT rig maintenance. Performed CT rig maintenance & changed out CT reel. Completed CT rig maintenance & change out of CT reel. PT'd BOPE. RIH w/bi-centered bit & tagged BTM @ 11736'. Drilled to 11759'. POOH w/BHA. RIH & drilled horizontal to 12000' MD. POOH. RIH & drilled f/12000' to 12350' w/short trips to window. Tagged shale interval @ 11680'. Reamed shale intervals f/11680' to 11720'. Drilled to 12540'. Wiper trip to 10800'. Re-drilled f/11712' to 11765'. Re-drilled f/11665' to 11850'. Unintentional OHST confirmed by MWD. Unable to work BHA past 11220'. POOH. RIH w/nozzle to 11224' (unable to get any further). Pumped 18 bbls of 17 ppg Neat Class G cement f/11200' to 10500'. Contaminated cement w/Biozan & jetted contaminated cement to 11050'. POOH. WOC. PT'd BOPE. RIH & tagged hard cement @ 11074'. Kicked off cement plug & drilled to 11515'. POOH w/BHA. RIH & drilled to 11600'. Drilled to 11838'. Backreamed shale intervals f/11725' - 11600' while POOH. RIH & drilled f/ 11405' to 11420'. Began open hole sidetrack trough drilling @ 11421 '. Drilled OHST to 11518'. CT stuck. Freed CT & POOH. RIH w/BHA & tagged BTM. Relogged GR & MWD f/10414' to BTM. Trip to window. 07-33A DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 10/15/98: 10/16/98: 10/17/98: 10/18/98: 10/19/98: 10/20/98: 10/21/98: 10/22/98: 10/23/98: 10/24/98: 10/25/98: 10/26/98: 12/5/98: POOH. RIH & drilled to 11550' MD. POOH to address MWD problems. RIH & drilled to 11581'. Drilled to 11661' MD & POOH due to MWD problems. RIH w/BHA & drilled to 11932'. Drilled to 12100' & POOH. RIH & drilled to 12244'. PUH to 10700' for CT reel motor repair. Completed CT reel motor repair. RBIH to BTM & drilled ahead to 12715'. Pumped 25 bbls of Crude to free stuck CT. Drilled to TD @ 12761' MD. Backreamed to 11900'. Continued to ream/backream tight spots f/11160' to 11850'. POOH while laying in new FIo Pro in open hole. RIH w/2-7/8" x 3-3/16" x 3-1/2" liner assembly & landed it @ 12762'. Pumped 30 bbls of 15.8 ppg LARC to cement liner in place. Chased w/wiper plug & bumped landing collar. Pumped Biozan sweep to clean out liner to 10532'. POOH w/CT nozzle while circulating 2% KCL water. WOC. RIH w/BHA to landing collar @ 12727' & cleaned up liner. Displaced well w/15 bbls of new FIo Pro. POOH w/BHA circulating 2% KCL water. PT'd liner to 2000 psi for 30 minutes - held tight. RIH w/CT SWS Gamma/CNL/CCL logging tools. Logged f/9980' to PBTD. POOH w/logging tools. Tested BOPE. RIH w/perf guns & tagged landing collar (PBTD) @ 12726'. Shot 955' of Initial Perforations located @: 11340' - 11560' MD (Zone 1 B) 11771' - 12251' MD (Zone 1 B) 12465'- 12720' MD (Zone lB) Used 2" carriers & shot all perfs @ 4 SPF. POOH w/guns. Laid down Perf guns. ASF. FP well. RD delayed due to weather. RDMOL. MIRU WLU & PT'd equip. RIH & set POGLM's @ 4170' & 7312'. POOH & RD. MIRU CTU & PT'd equip. RIH & performed a FCO to 12717'. Displaced well w/Crude while POOH. RD. Placed well on initial production & obtained a valid well test. H, LL LOG TRANSMITTAL. ~_.Active Diagnostic Servicer. - To: ARCO Alaska, Inc. AOGCC Lori Taylor RE' Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of' Robert Richey POS, Inc. Mail Pouch 340112 Prudhoe Bay, AK 99734 Los CD-ROM MYLAR / BLUE LINE REPORT WELL DATE I TYPE OR SEPIA PRINT(S) OR FLOPPY REM BLUELINE i Open Hole I I 1 ~ Res. Eval. CH I I 1 7-33 i Mech. 'cH I 1 .., · ] ~ Caliper Survey I Rpt or I I FFFIVFD I 1BL/ IF , ! ' ¥ '"' '~ ~ MAR 17 Signed' ~--/'~. L~ ! Date' Print Name: ~ .) Alaska Oil S Gas {;o~s. Corniness}or, Ancnc~age ProActive Diagnostic Services, Inc., Pouch 340112, Prudhoe Bay, AK 99734 ~_ ,,~n¢:(907)659-2307 Fax:(907)659-2314 E-maik pdspmdho¢~NAS00.net WcbsJte: c:~4y Documen~Ex¢¢k%Vord_Docum~n[s\D~s~Hbudon_Fo~nsLA~o_pb_form.do( Schlumberger NO. 12942 11117~99 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) Well Job # Log Description Date BL Sepia CD D.S. 4-21 LEAK DETECTION LOG 991101 I 1 D.S. 4-30 PRODUCTION PROFILE 991031 I 1 D.S. 7-24 PRODUCTION PROFILE W/DEFT 991031 I 1 D.S. 7-33A PB2 iGAS LIFT & FBHP SURVEY 991028 I 1 D.S. 14-04A .;~..~,-z~c~ 99378 RST BORAX 990920 I I 1 D.S. 15~2 lA ~ j.~_. ~;i '.-'.~ ~t 99274 MCNL 990620 I I I i999 DATI::: ~ 0il & Gas Cons. Commission ~ch0rage Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you. 0 I~ I I--I-- I IM CS WELL LOG TRANSMITr~ To: State of Alaska April 6, 1999 Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 O{ ~' [t4 c4 MWD Formation Evaluation Logs D.S. 7-33A, 7-33A PB 1 & PB2, AK-MW-80395 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 DS 7-33A: 2"x 5" MD Resistivity & Gamma Ray Logs: 50-019-21809-01 2"x 5" TVD Resistivity & Gamma Ray Logs: 50-019-21809-01 DS 7-35A PBI: 2"x 5" MD Resistivity & Gamma Ray Logs: 50-019-21809-70 2"x 5" TVD Resistivity & Gamma Ray Logs: 50-019-21809-70 DS 7-33A PB2: 2"x 5"MD Resistivity & Gamma Ray Logs: 50-019-21809-71 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-019-21809-71 r', 6 ]999 ./'.,PR Gas Cans. 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company 0 I::! I I--I-- I I~ G S ~::: I::! L~ I I-' E S WELL LOG TRANSMITTAL To: State of Alaska April 6, 1999 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - D.S. 7-33A, AK-MW-80395 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention · Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-21809-01. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company 0 I:! I I--I--I IM G SEI:IL~I r' E S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Cornm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 April 6, 1999 MWD Formation Evaluation Logs - D.S. 7-33A PB2, AK-MW-80395 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention ot~ Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-21809-71. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company I~ F::t I L-L- I IM (3 Si= FIL/I r- I~ S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 April 1, 1999 RE: MWD Formation Evaluation Logs - D.S. 7-33A PB 1, AK-MW-80395 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of~ Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-21809-70. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company BP EXPLORATION Date: 1-28-99 Trans# 90208 BP/ENDICOTT CASED HOLE LOGS Enclosed is the materials listed below. If you have any questions please contact me in the Petrotechnical Data Center at (907) 564-4166. Sw Name Rec Type Rec Date Company Code Comments 2-30NEI02 CH 19-Jan-99 SCH ULTRA SONIC IMAGER ~t..,f~e.,'~ ~ 2-30A/El02 CH 06-Dec-98 SCH DEPTH DETERMINATION LOG SEVERIN~ - / TOOL SHOT RECORD 2-30A/El02 CH 21-OCT-98 SCH PLUG SET RECORD 2-30A/El02 CH 09-Jan-99 SCH REPEAT FORMATION TESTER (COLOR LOGS) Please sign and return one copy of this transmittal. Thank-you, ~~ Carla H. Mclntosh Petrotechnical Data Center v CH LOGS AOGCC .... 1 blueline/1 sepia DNR .... 1 blueline Lod Taylor Tim Rhyherd RECEIVED JAN 2 8 1999 Nasl$ 0il & Gas C~s. Commiss~ An~e Petrotechnical Data Center, MB3-3 900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612 BP EXPLORATION Date: 1-28-99 Trans# 90209 BP/ENDICOTT CASED HOLE LOGS Enclosed is the materials listed below. If you have any questions please contact rr, Petrotechnical Data Center at (907) 564-4166. Name IRec Type IRec Date ICompanyCode Comments I 12-30A/El02 ICH I 15'Jan'991Atlas Segmented Bond Log- Gamma Ray/CCL I Please sign and return one copy of this transmittal. Carla H. Mclntosh Petrotechnical Data Center CH LOGS Madellyn Millholland MB 7-1 AOGCC .... 1 blueline/1 sepia DNR .... 1 blueline 1 blueline Lod Taylor Tim Rhyherd RECEIVED JA¢ 2_.8 1999 Petrotechnical Data Center, MB3-3 900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612 STATE OF ALASKA . ALA~-~(A OIL AND GAS CONSERVATION COM~SSION ~'~ ? ~..~ ~ ~ V t~ ~ WELL COMPLETION OR RECOMPLETION REPORT AN 'TO' 1. Status of well Classification of Service We-II."'" Oil ~1 Gas D suspended D Abandoned D Service D . .. :~--...i~ '-~ ~;-,q r~,u,~..r ....... 2. Name of Operator 7. Permit Nun~ AR~ Alaska, Inc. 98-144 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 50-029-21809-01 4. Location of well at suda~ -~~. ~~ 19. Unit or Lea~ N~e 1068' FNL, 5~' ~L, SEC. 34, T11N, R14E, UM At T~ Producing Inte~al i~~ ~52' FNL, 5165' FEL, SEC. 26, TllN, R14E, UM~ _ ..~--2'/ 07-33A 3066' FNL, 35~' FEL, SEC 26, T11N, R14E, UM ~ ~ ~ - ...... PRUDHOE BAY FIELD 5. Elevat~n in feet (ind~ate KB, DF, etc.) ~6. Lease Designation ~d Se~l No. RKB 60 feet~ ADL 28308 PRUDHOE BAY OIL POOL 12. Date Spudded 13. Date T.D. Rea~ed 14. Date Co~., Susp. Or ~d. ~ 15. Water D~th, if o~om 16. No. ot Co~let~ns 09/21/98 10/19/98 10/25/98 ~ N/A fe~ MSL 1 17. Total Depth (MD + TVD) 18. Plug Back D~th (MD + TVD) 19. Dimction~ Suwey ~20. D~th where S~V set 21. Th~e~ of Pe~mst 12761' MD /8931' ~D 12726' MD /8934' ~D YES ~ No ~ ~ ~3' MD. lea MD 1900' (approx) ~. T~ E~ or Other Lo~ Run SWS Gamm~CN~CCL, MWD/GR 23. CASING, LINER AND CEME~ING RECORD SE~ING DEPTH MD CASING SIZE ~. PER ~. G~DE TOP BOSOM HOLE SIZE CEME~ING RECORD AMOU~ PULLED 20" 91.5~ H-40 Surfa~ 110' 30" 2150~ Poleset 13-3/8" 6~/72~ K-55 / L-80 Surfa~ 3365' 17-1/2" 2000 Sx CS III, 200 Sx CS I & 600 ~ G 9-5/8' 47~ L-80 Surfa~ 10413' 12-1/4" 6~ Sx C~ G & 400 Sx CS I 7" 29~ L-80 10166' 10770' 8-1/2" 45o sx C~ G 3-3/16"/2-7/8" 6.20/6.50 L-80 10081' 12762' 3-3/4" 30 bbls 15.8 ~ ~RC 24. Pedorations open to Pmdu~ion (MD + TVD of T~ ~d BoEom ~d 25. ~BING RECORD intewal, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5-1/2" 10141' 10141' 11340' - 11560' MD; 8961' - 8959' ~D; ~4 SPF 4-1/2" 10259" 11771' - 1~51' MD; 8955' - 8946' ~D; ~4 SPF 26. ACID, F~CTURE, CEMENT SQUEEZE, ~C. 12465' - 12720' MD; 8935' - 8934' ~D; ~4 SPF DEPTH INTERVAL (MD) ~OU~ & KIND OF MATERIAL USED Dalo Fill Pmdu~ion Mothod of Opomtion (Flowing, ~s I~, olc.) De~mber 13, 1998 Gas Lift Date of Test Hours Tested Production for OIL-BBL ~S-MCF WATER-BBL CHOKE SIZE I~S-OIL ~TIO 1~14/98 2.4 Test Pedod > 1050 3445 460 ~ 3281 Flow Tubing Casing Pressure Calculated OIL-BBL ~S-MCF WATER-BBL OIL G~VI~ - APl (coif) Pmk. 311 psi 24-Hour Rate > 28. CORE DATA Brief de~dption of Iitholo~, pomsi~, fractures, ~pamnt dips ~d pms~n~ of oil, gas or water. Submit ~m ch~s. * This 10-407 is submiffed as directed per the 10-401 form approved 8/14/98 (Permit ~ 98-1~). Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. NAME Sag River Top Shublik Top Top of Sadlerochit Zone 1B GEOLOGIC MARKER~. ~J MEAS. DEPTH 10362' 10404' 10470' 11065' TRUE VERT. DEPTH 8373' 8408' 846~ 8913' '-~ ~.,-' FORMATION TESTS Include interVal tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. 31. LIST OF ATTACHMENTS Summary of 07-33A CT Sidetrack Drilling Operations + Survey. 32. I hereby certify that the following is true and correct to the best of my knowledge. Bruce E. Smith, P.E. Title AAI Coil Tubin,q Ddllin,q SuperVisor Date INSTRUCTIONS Prepared by Paul Rauf 263-4990. General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27-' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-4O7 ..... 07-33A DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 9/21/98: 9/22/98: 9/28/98: 9/29/98: 9/30/98: 10/01198: 10/02/98: 10/03/98: 10/04/98: 10/05/98: 10/06/98: 10/07/98: 10/08/98: 10/09/98: 10/10/98: 10/11/98: 10/1 2/98: 10/13/98: 10/14/98: MIRU CTU & PT'd equip. RIH w/BHA & milled XN nipple to 3.8" ID @ 10246' MD. Tagged Whipstock @ 10767' MD. Milled window off Whipstock through the 7" liner to 10773' MD. Circulated Biozan & POOH w/BHA. RIH w/BHA & drilled into FM to 10780'. Reamed/backreamed window area & POOH. RD. MIRU CTU. N/U BOPE. Completed MIRU. PT'd BOPE to 3500 psi.. Killed well. RIH w/BHA & tagged BTM @ 10784' MD. Displaced well to FIo Pro. Drilled to 10800'. Performed LOT to EMW of 9.5 ppg. Drilled to 10900' & POOH. RIH & drilled to 10950'. Drilled build section f/10950' to 11413' w/periodic short wiper trips to window. POOH. RIH & drilled to 11736'. POOH to repair small leak in CT. Completed POOH. Performed CT rig maintenance. Performed CT rig maintenance & changed out CT reel. Completed CT rig maintenance & change out of CT reel. PT'd BOPE. RIH w/bi-centered bit & tagged BTM @ 11736'. Drilled to 11759'. POOH w/BHA. RIH & drilled horizontal to 12000' MD. POOH.' RIH & drilled f/12000' to 12350' w/short trips to window. Tagged shale interval @ 11680'. Reamed shale intervals f/11680' to 11720'. Drilled to 12540'. Wiper trip to 10800'. Re-drilled f/11712' to 11765'. Re-drilled f/11665' to 11850'. Unintentional OHST confirmed by MWD. Unable to work BHA past 11220'. POOH. RIH w/nozzle to 11224' (unable to get any further). Pumped 18 bbls of 17 ppg Neat Class G cement f/11200' to 10500'. Contaminated cement w/Biozan & jetted contaminated cement to 11050'. POOH. WOC. PT'd BOPE. RIH & tagged hard cement @ 11074'. Kicked off cement plug & drilled to 11515'. POOH w/BHA. RIH & drilled to 11600'. Drilled to 11838'. Backreamed shale intervals f/11725' - 11600' while POOH. RIH & drilled f/ 11405' to 11420'. Began open hole sidetrack trough drilling @ 11421' Drilled OHST to 11518'. CT stuck. Freed CT & POOH. RIH w/BHA & tagged BTM. Relogged GR & MWD f/10414' to BTM. Trip to window. "- ..... 07-33A DESCRIPTION OF WORK COMPLETED COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 10/15/98: 10/16/98: 10/17/98: 10/18/98: 10/19/98: 10/20/98: 10/21/98: 10/22/98: 10/23/98: 10/24/98: 10/25/98: 10/26/98: 1 2/5/98: POOH. RIH & drilled to 11550' MD. POOH to address MWD problems. RIH & drilled to 11581'. Drilled to 11661' MD & POOH due to MWD problemsl RIH w/BHA & drilled to 11932'. Drilled to 12100' & POOH. RIH & drilled to 12244'. PUH to 10700' for CT reel motor repair. Completed CT reel motor repair. RBIH to BTM & drilled ahead to 12715'. Pumped 25 bbls of Crude to free stuck CT. Drilled to TD @ 12761' MD. Backreamed to 11900'. Continued to ream/backream tight spots f/11160' to 11850'. POOH while laying in new FIo Pro in open hole. RIH w/2-7/8" x 3-3/16" x 3-1/2" liner assembly & landed it @ 12762'. Pumped 30 bbls of 15.8 ppg LARC to cement liner in place. Chased w/wiper plug & bumped landing collar. Pumped Biozan sweep to clean out liner to 10532'. POOH w/CT nozzle while circulating 2% KCL water. WOC. RIH w/BHA to landing collar @ 12727' ~'~'~i'b'd up liner. Displaced well w/15 bbls of new FIo Pro. POOH w/BHA circulating 2% KCL water. PT'd liner to 2000 psi for 30 minutes - held tight. RIH w/CT SWS Gamma/CNL/CCL logging tools. Logged f/9980' to PBTD. POOH w/logging tools. Tested BOPE. RIH w/perf guns & tagged landing collar (PBTD) @ 12726'. Shot 955' of Initial Perforations located @: 11340' - 11560' MD (Zone 1 B) 11771' - 12251' MD (Zone lB) 12465'- 12720' MD (Zone lB) Used 2" carriers & shot all perfs @ 4 SPF. POOH w/guns. Laid down Perf guns. ASF. FP well. RD delayed due to weather. RDMOL. MIRU WLU & PT'd equip. RIH & set POGLM's @ 4170' & 7312'. POOH & RD. MIRU CTU & PT'd equip. RIH & performed a FCO to 12717'. Displaced well w/Crude while POOH. RD. Placed well on initial production & obtained a valid well test. D Ft I I_1_ I I~ I~ S E I::l~J I r- E S 09-Dec-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 07-33PB2 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: 11,055.23' MD Window / Kickoff Survey: 11,074.00' MD Projected Survey: 11,838.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 SiIverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 07 07-33APB2 Job No. AKMW80395, Surveyed: t2 October, 1998 SURVEY REPORT 11 November, 1998 Your Ref: API-500292180971 KBE- 60.0' Surface Coordinates: 5949868.58 N, 676719.59 E (70° 16' 06.9499' N, 148° 34' 15.0372' W) DRILklNI~ SERVICES DEC 17 199B Survey Ref: svy3928 Prudhoe Bay Unit Measured Depth (ft) Incl. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Depth (ft) Survey Report for 07-33APB2 Your Ref: API-500292f80971 Job No. AKMW80395, Surveyed: 12 October, 1998 11055.23 67.410 60.450 8849.51 8909.51 11074.00 70.510 62.000 8856.25 8916.25 11090.33 70.220 66.430 8861,74 8921.74 11121.73 71.100 73.100 8872.15 8932.15 11151.79 75.410 77.150 8880.81 8940.81 11182.08 79.720 81.890 8887.33 8947.33 11229.29 84.810 91.560 8893.70 8953.70 11264,26 88.070 97.360 8895.87 8955.87 11292,82 86.660 104.040 8897.19 8957.19 11319.58 84.640 109.140 8899.22 8959.22 11350.36 84.640 111.070 8902.10 8962.10 11380.18 89.820 110.550 8903.54 8963.54 11416.96 92.640 116.170 8902.75 8962.75 11449,73 94.390 121.270 8900.74 8960.74 11481.02 93.340 127.250 8898.62 8958.62 11509.26 88.680 126.890 8898,13 8958.13 11548.59 86.130 130.230 8899.91 8959.91 11605.53 85.690 132.520 8903.97 8963.97 11637.46 88.420 128.480 8905.61 8965.61 11691.60 88.070 124.080 8907.27 8967.27 11738.78 88.940 120.220 8908.50 8968.50 11775.53 89.120 117.930 8909.12 8969.12 11815.33 87.540 116.000 8910.28 8970.28 11838.00 86.650 114.930 8911.43 8971.43 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3392.60 N 4856.97 E 5953374.27 N 681495.57 E 3401.03 N 4872.32 E 5953383.06 N 681510.72 E 3407.72 N 4886.17 E 5953390.07 N 681524.40 E 3417.95 N 4913.95 E 5953400.96 N 681551.94 E 3425.33 N 4941.76 E 5953408.98 N 681579.57 E 3430.69 N 4970.83 E 5953415.03 N 681608,51E 3433.34 N 5017.46 E 5953418.77 N 681655.06 E 3430.62 N 5052.24 E 5953416.87 N 681689.89 E 3425.33 N 5080.26 E 5953412.24 N 681718.03 E 3417.72 N 5105.82 E 5953405.22 N 681743.76 E 3407.18 N 5134.60 E 5953395.37 N 681772.78 E 3396.60 N 5162.43 E 5953385.45 N 681800.85 E 3382.03 N 5196.17 E 5953371.67 N 681834.93 E 3366.32 N 5224.84E 5953356.64N 681863.96 E 3348.75 N 5250.63 E 5953339.68 N 681890.16 E 3331.74 N 5273.16 E 5953323.20 N 681913.07 E 3307.25 N 5303.87 E 5953299.44 N 681944,35 E 3269.72 N 5346.49 E 5953262.92 N 681987.84E 3249.01N 5370.73 E 5953242.79 N 682012.56 E 3217.00 N 5414.34 E 5953211.81N 682056.91E 3191.91N 5454.27 E 5953187.66 N 682097.42 E 3174.05 N 5486.38 E 5953170.56 N 682129.94 E 3156.02 N 5521.83 E 5953153.36 N 682165.81E 3146.28 N 5542,27 E 5953144.11N 682186,47 E Alaska State Plane Zone 4 PBU EOA DS 07 Dogleg Rate (°/100ft) Vertical Section (ft) Comment 18.225 25.611 20.237 19.285 20.877 22.976 18.996 23.880 20.447 6.243 17.458 17.091 16.425 19.361 16.551 10.677 4.085 15,256 8.149 8,384 6.250 6.265 6.135 4859.93 4875.29 4889.14 4916.93 4944.74 4973.82 5020.46 5055.23 5083.24 5108.80 5137.57 5165,39 5199.12 5227,78 5253.55 5276,06 5306.76 5349.34 5373.56 5417.15 5457.05 5489.15 5524.59 5545.02 Tie-on Survey Window Point Projected Survey Continued... November, 1998 - 11:40 - 2- DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Survey Report for 07-33APB2 Your Ref: AP1-500292180971 Job No. AKMW80395, Surveyed: 12 October, 1998 Alaska State Plane Zone 4 PBU_EOA DS 07 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 27.930° (28-Sep-98) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 89.950° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11838.00ft., The Bottom Hole Displacement is 6373.06ft., in the Direction of 60.417° (True). Comments Measured Depth (ft) 11055.23 11074.00 11838.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 8909.51 3392.60 N 4856.97 E 8916.25 3401.03 N 4872.32 E 8971.43 3146.28 N 5542.27 E Comment Tie-on Survey Window Point Projected Survey 11 November, 1998 - 11:40 - 3 - DrillQuest 0 F! I I_1_11~ G S E I::! ~J I r' ~: S 09-Dec-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 07-33APB1 Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 10,700.00' MD 10,767.00' MD 12,540.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) DEC 17 A~ch0rage 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_EOA DS 07, Slot 07-33 07.33APBf Job No. AKMWS0395, Surveyed: 9 October, 1998 S UR VEY REPORT ORIGINAL RE, CE~'VED 9 December, 1998 Your Reft API-500292180970 KBE- 60.00 Surface Coordinates: 5949868.58 N, 676719.59 E (70° ~6' 06.9499" N, ~48° 34' ~5.0372" W) DRILI~ING 5 I~RVI CtE El Survey Ref: svy3926 Sperry-Sun Drilling Services Survey Report for 07-33APB1 Your Ref: API-500292180970 Job No. AKMWS0395, Surveyed: 9 October, 1998 Prudhoe Bay Unit Measured Depth (ft) Incl. Sub-Sea Depth (ft) Vertical Depth (ft) 10700.00 33.670 71.900 8594.50 8654.50 10767.00 33.230 71.000 8650.40 8710.40 10822.38 36.470 70.000 8695.84 8755.84 10848.29 37.260 69.700 8716.57 8776.57 10877.56 38.410 69.000 8739.69 8799.69 10906.77 41.310 68.400 8762.11 8822.11 10948.79 47.270 67.700 8792.18 8852.18 10989.20 54.290 63.000 8817.72 8877.72 11023.17 61.640 61.230 8835.73 8895.73 11055.23 67.410 60.450 8849.51 8909.51 11088.24 72.860 63.260 8860.73 8920.73 11124.44 78.220 67.300 8869.76 8929.76 11152.20 80.600 73.280 8874.87 8934.87 11194.99 83.500 83.480 8880.80 8940.80 11221.80 84.290 89.450 8883.66 8943.66 11274.38 81.560 99.470 8890.15 8950.15 11303.75 82.090 105.980 8894.33 8954.33 11335.97 87.630 107.560 8897.22 8957.22 11377.27 89.820 114.760 8898.14 8958.14 11402.54 90.530 118.460 8898.06 8958.06 11427.92 92.020 119.690 8897.49 8957.49 11464.05 88.770 119.860 8897.24 8957.24 11504.18 86.220 117.050 8899.00 8959.00 11536.43 85.340 114.410 8901.37 8961.37 11569.97 86.040 111.950 8903.89 8963.89 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3300.14 N 4637.02 E 5953276.68 N 681277.85 E 3311.89 N 4672.03 E 5953289.24 N 681312.58 E 3322.46 N 4701.85 E 5953300.51N 681342.15 E 3327.81 N 4716.45 E 5953306.21N 681356.61 E 3334.15 N 4733.25 E 5953312.93 N 681373.25 E 3340.95 N 4750.69 E 5953320.14 N 681390.53 E 3351.92 N 4777.88 E 5953331.75 N 681417.46 E 3365.02 N 4806.28 E 5953345.51N 681445.54E 3378.50 N 4831.70 E 5953359.58 N 681470.64E 3392.60 N 4856.97 E 5953374.27 N 681495.57 E 3407.22 N 4884.33 E 5953389.53 N 681522.58 E 3421.86 N 4916.16 E 5953404.91 N 681554.06 E 3431.05 N 4941.84E 5953414.71N 681579.51E 3439.56 N 4983.29 E 5953424.19 N 681620.75 E 3441.20 N 5009.88 E 5953426.45 N 681647.30 E 3437.16 N 5061.83 E 5953423.64N 681699.33 E 3430.76 N 5090.18 E 5953417.90 N 681727.82 E 3421.51N 5120.89 E 5953409.37 N 681758.74 E 3406.61N 5159.37 E 5953395.38 N 681797.55 E 3395.30 N 5181.95 E 5953384.60 N 681820.40 E 3382.97 N 5204.13 E 5953372.79 N 681842.86 E 3365.03 N 5235.48 E 5953355.59 N 681874.63 E 3345.93 N 5270.73 E 5953337.33 N 681910.31 E 3331.96 N 5299.70 E 5953324.05 N 681939.60 E 3318.80 N 5330.44 E 5953311.61 N 681970.64E Alaska State Plane Zone 4 PBU EOA DS 07 Dogleg Rate (°/'tOOft) Vertical Section (ft) Comment 0.990 5,941 3.127 4.194 10.015 14.231 19.562 22.082 18.131 18.347 18.328 22.843 24.559 22.336 19.609 22.014 17.874 18.217 14.909 7.612 9.008 9.450 8.608 7.606 4639.90 4674.92 4704.75 4719.35 4736.15 4753.60 4780.81 4809.21 4834.65 4859.93 4887.31 4919.15 4944.83 4986.29 5012.89 5064.83 5093.17 5123.87 5162.34 5184.92 5207108 5238.42 5273.64 5302.60 5333.33 Tie-in Survey Window Point Continued... 9 December, 1998 - 8:20 - 2 - DrillQuest Sperry-Sun Drilling Services Survey Report for 07-33APB1 Your Ref: API-500292180970 Job No, AKMWS0395, Surveyed: 9 October, 1998 Prudhoe Bay Unit Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 11606.21 86.570 108.960 8906.23 8966.23 11643.82 86.840 106.150 8908.39 8968.39 11673.88 87.010 t03.870 8910.00 8970.00 11698.41 87.540 101.760 8911.17 8971.17 11733.45 87.190 98.770 8912.78 8972.78 11764.58 88.500 100.180 8913.95 8973.95 11789.29 91.140 99.820 8914.03 8974.03 11839.14 90.700 95.780 8913.23 8973.23 11873.85 94.220 93.670 8911.74 8971.74 11904.09 93.690 92.790 8909.65 8969.65 11931.45 93.690 90.860 8907.89 8967.89 11981.89 93.780 86.290 8904.61 8964.61 12019.80 92.990 84.000 8902.37 8962.37 12056.86 94.040 81.890 8900.09 8960.09 12087.11 95.010 78.380 8897.71 8957.71 12121.50 95.800 76.440 8894.47 8954.47 12167.32 95.360 76.090 8890.01 8950.01 12197.21 93.340 80.660 8887.74 8947.74 12230.79 92.280 82.600 8886.10 8946.10 12275.72 95.270 87.170 8883.14 8943.14 12312.18 96.500 92.260 8879.40 8939.40 12346.85 92.990 93.500 8876.53 8936.53 12371.90 90.970 91.910 8875.66 8935.66 12404.66 90.880 89.450 8875.14 8935.14 12437.55 91.670 89.800 8874.40 8934.40 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3306.16 N 5364.32 E 5953299.77 N 682004.81E 3294.84N 5400.12 E 5953289.29 N 682040.86 E 3287.07 N 5429.11E 5953282.20 N 682070.03 E 3281.63 N 5453.00 E 5953277.33 N 682094.04 E 3275.40 N 6487.44 E 5953271.90 N 682128.62 E 3270.28 N 5518.12 E 5953267.50 N 682159.41E 3265.98 N 5542.45 E 5953263.79 N 682183.84E 3259.22 N 5591,82 E 5953258.18 N 682233.35 E 3256.37 N 5626.37 E 5953256.14 N 682267.96 E 3254.67 N 5656.49 E 5953255.15 N 682298.11 E 3253.80 N 5683.78 E 5953254.92 N 682325.42 E 3255.05 N 5734.09 E 5953257.35 N 682375.68 E 3258.25 N 5771.79 E 5953261.44 N 682413.30 E 3262.79 N 5808.50 E 5953266.84N 682449.89 E 3267.96 N 5838.20 E 5953272.70 N 682479.46 E 3275.42 N 5871.62 E 5953280.95 N 682512.69 E 3286.25 N 5915.91E 5953292.81N 682556.72 E 3292.25 N 5945.10 E 5953299.50 N 682585.76 E 3297.13 N 5978.28 E 5953305.16 N 682618.81E 3301.13 N 6022.91 E 5953310.20 N 682663.34 E 3301.31 N 6059.17 E 5953311.23 N 682699.58 E 3299.58 N 6093.67 E 5953310.31 N 682734.12 E 3298.39 N 6118.68 E 5953309.71N 682759.14 E 3298.01N 6151.43 E 5953310.10 N 682791.89 E 3298.22 N 6184.31 E 5953311.08 N 682824.76 E Alaska State Plane Zone 4 PBU EOA DS 07 Dogleg Vertical Rate Section (°/'lOOft) (ft) Comment 8.362 5367.20 7.494 5402.99 7.595 5431.97 8.859 5455.86 8.582 5490.29 6.180 5520.97 10.783 5545.30 8.151 5594.66 11.820 5629.21 3.391 5659.33 7.039 5686.62 9.043 5736.92 6.380 5774.63 6.350 5811.34 12.003 5841.05 6.068 5874.47 1.225 5918.78 16.675 5947.97 6.577 5981.15 12.136 6025.79 14.291 6062.05 10.733 6096.55 10.260 6121.55 7.513 6154.30 2.627 6187.18 Continued... 9 December, 1998 - 8:20 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for 07-33APB'I Your Ref: API-500292'180970 Job No. AKMW80395, Surveyed: 9 October, '1998 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastlngs (ft) (ft) (ft) (ft) 12467.36 93.430 87.340 8873.08 8933.08 3298.96 N 6214.08 E 5953312.52 N 682854.50 E 12514.45 94.390 85.060 8869.87 8929.87 3302.08 N 6260.95 E 5953316.74 N 682901.29 E 12540.00 94.390 85.060 8867.91 8927.91 3304.27 N 6286.33 E 5953319.53 N 682926.61E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 27.930° (28-Sep-98) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 89.950° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12540.00ft., The Bottom Hole Displacement is 7101.84ft., in the Direction of 62.272° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 10700.00 8654.50 3300.14 N 4637.02 E Tie -in Survey 10767.00 8710.40 3311.89 N 4672.03 E Window Point 12540.00 8927.91 3304.27 N 6286.33 E Projectd Survey Alaska State Plane Zone 4 PBU EOA DS 07 Dogleg Rate (°/lOOft) Vertical Section (ft) Comment 10.140 5.243 0.000 6216.95 6263.83 6289.21 Projectd Survey 9 December, 1998 - 8:20 -4 - DrillQuest 0 Ft I I--I--I N G S E I::! ~./I ~- E S 09-Dec-98 AOGCC Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Re: Distribution of Survey Data for Well 07-33A Dear Lori Taylor: Enclosed are two survey hard copies. Tie-on Survey: 11,416.96' MD Window / Kickoff Survey: 11,420.00' MD Projected Survey: 12,761.00' MD (if applicable) Please call me at 563-3256 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS 07 07-33A Job No. AKMW80395, Surveyed: 18 October, 1998 SURVEY REPORT November, 1998 ORIGINAL ~E, CE~VED DEC 17 1998 Oil & Gas C~.~s. Your Reft API-500292180901 KBE- 60.0' Surface Coordinates: 5949868.58 N, 676719.59 E (70° 16' 06.9499' N, 148° 34' 15.0372' VI/) DRILL, IN(; SERVICE5 Survey Reft svy3930 Prudhoe Bay Unit Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Depth (ft) Survey Report for 07-33A Your Ref: API-500292180901 Job No. AKMW80395, Surveyed: 18 October, 1998 11416.96 92.640 116.170 8902.75 8962.75 11420.00 92.800 116.600 8902.60 8962.60 11438.48 92.810 117.930 8901.70 8961.70 11475.35 90.700 124.780 8900.57 8960.57 11514.58 89.820 131.110 8900.39 8960.39 11543.58 93.080 133.220 8899.65 8959.65 11574.35 92.110 127.950 8898.26 8958.26 11601.16 92.460 122.300 8897.19 8957.19 11637.30 92.600 116.040 8895.59 8955.59 11664.48 92.020 111.950 8894.50 8954.50 11691.66 90.180 107.380 8893.98 8953.98 11722.30 89.560 102.810 8894.05 8954.05 11754.06 89.380 96.480 8894.34 8954.34 11785.80 90.440 91.560 8894.39 8954.39 11814.28 90.530 85.410 8894.15 8954.15 11843.65 92.990 80.660 8893.25 8953.25 11885.08 94.830 80.140 8890.42 8950.42 11923.17 90.790 85.060 8888.55 8948.55 11960.78 90.700 89.630 8888.06 8948.06 11990.99 90.180 95.250 8887.83 8947.83 12020.09 90.880 93.140 8887.56 8947.56 12056.05 87.010 88.900 8888.22 8948.22 12074.63 87.540 87.170 8889.11 8949.11 12102.42 90.260 86.290 8889.64 8949.64 12123.13 89.560 88.400 8889.67 8949.67 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 3382.03 N 5196.17 E 5953371.67 N 681834.93 E 3380.68 N 5198.89 E 5953370.39 N 681837.68 E 3372.23 N 5215.30 E 5953362.32 N 681854.28 E 3353.06 N 5246.75 E 5953343.90 N 681886.17 E 3328.95 N 5277.67 E 5953320.52 N 681917.65 E 3309.50 N 5299.15 E 5953301.57 N 681939.58 E 3289.51 N 5322.49 E 5953282.14 N 681963.38 E 3274.10 N 5344.39 E 5953267.25 N 681985.64E 3256.51 N 5375.90 E 5953250.40 N 682017.55 E 3245.47 N 5400.70 E 5953239.95 N 682042.61 E 3236.33 N 5426.29 E 5953231.41 N 682068.40 E 3228.35 N 5455.86 E 5953224.13 N 682098.15 E 3223.03 N 5487.15 E 5953219.55 N 682129.56 E 3220.81 N 5518.81 E 5953218.07 N 682161.26 E 3221.56 N 5547.26 E 5953219.49 N 682189.69 E 3225.12 N 5576.39 E 5953223.73 N 682218.73 E 3232.01N 5617.14 E 5953231.57 N 682259.31E 3236.90 N 5654.85 E 5953237.35 N 682296.89 E 3238.65 N 5692.41E 5953239.98 N 682334.39 E 3237.36 N 5722.58 E 5953239.40 N 682364.59 E 3235.23 N 5751.60 E 5953237.95 N 682393.65 E 3234.59 N 5787.53 E 5953238.16 N 682429.58 E 3235.23 N 5806.08 E 5953239.23 N 682448.11E 3236.81 N 5833.81E 595324~.46 N 682475.80 E 3237.77 N 5864.50 E 5953242.91N 682496.46 E Alaska State Plane Zone 4 PBU EOA DS 07 Dogleg Rate (°/'lOOft) Vertical Section (ft) Comment 15.077 7.189 19.431 16.290 13.389 17.397 21.098 17.309 15.186 18.122 15.052 19.938 15.856 21.596 18.205 4.614 16.699 12.152 18.682 7.639 15.961 9.728 10.287 10.734 5199.12 5201.84 5218.24 5249.67 5280.57 5302.04 5325.35 5347.24 5378.74 5403.53 5429.11 6458.68 5489.96 5521.61 5550.07 5579.20 5619.96 5657.67 5695.23 5725.40 5754,42 5790.35 5808.90 5836.64 5857.32 Tie-on Survey Window Point Continued... 11 November, 1998 - 11:59 - 2- DrillQuest Sperry-Sun Drilling Services Survey Report for 07-33A Your Ref: API-5002929 80901 Job No. AKMW80395, Surveyed: ~8 October, ~998 Prudhoe Bay Unit Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 12149.18 92.020 89.280 8889.31 8949.31 3238.30 N 5880.54 E 5953244.05 N 682522.48 E 12184.52 91.140 94.380 8888.34 8948.34 3237.17 N 5915.84 E 5953243.75 N 682557.80 E 12213.18 92.020 97.360 8887.55 8947.55 3234.24 N 5944.33 E 5953241.49 N 682586.35 E 12245.91 94.220 96.480 8885.77 8945.77 3230.30 N 5976.77 E 5953238.31 N 682618.88 E 12276.33 94.570 93.500 8883.44 8943.44 3227.67 N 6006.98 E 5953236.38 N 682649.14 E 12304.86 93.690 89.800 8881.38 8941.38 3226.85 N 6035.42 E 5953236.23 N 682677.59 E 12340,73 92.990 84.180 8879.29 8939.29 3228.73 N 6071.17 E 5953238.95 N 682713.28 E 12377.08 90.880 84.880 8878.06 8938.06 3232.19 N 6107.33 E 5953243.26 N 682749.35 E 12407.49 91.580 82,420 8877.41 8937.41 3235.55 N 6137.54 E 5953247.33 N 682779.48 E 12435.63 93.340 78.200 8876.20 8936.20 3240.28 N 6165.25 E 5953252.71 N 682807.07 E 12474.76 92.110 81.540 8874.34 8934.34 3247.16 N 6203.72 E 5953260.49 N 682845.37 E 12504.36 91.140 83.650 8873.50 8933.50 3250.97 N 6233.06 E 5953264.99 N 682874.61 E 12546.30 89.380 89.450 8873.31 8933,31 3253.49 N 6274.90 E 5953268.49 N 682916.38 E 12580.98 87.710 87.170 8874.19 8934.19 3254.51 N 6309.55 E 5953270.33 N 682951.00 E 12611.40 87.280 84.180 8875.52 8935.52 3256.80 N 6339.85 E 5953273.33 N 682981.24 E 12645.34 89.030 80.310 8876.61 8936.61 3261.38 N 6373.46 E 5953278.69 N 683014.72 E 12677.04 90.700 78.380 8876.69 8936,69 ' 3267.24 N 6404.61 E 5953285.28 N 683045.73 E 12710.39 94.830 77.500 8875.08 8935.08 3274.20 N 6437,18 E 5953293.01 N 683078,12 E 12761.00 94.830 77.500 8870.82 8930.82 3285.11 N 6486.41 E 5953305.07 N 683127.09 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 27.930° (28-Sep-98) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well Reference and calculated along an Azimuth of 89.950° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12761.00ft., The Bottom Hole Displacement is 7270.87ft., in the Direction of 63.140° (True). Alaska State Plane Zone 4 PBU EOA DS 07 Dogleg Rate (°/lOOft) Vertical Section (ft) Comment 10.029 14.639 10.838 7.238 9.835 13.298 15.762 6.115 8.409 16,235 9.087 7.843 14.451 8.147 9.921 12.5o8 8.051 12.661 0.000 5883.36 5918.66 5947.15 5979.59 6009,80 6038.24 6073.98 6110.15 614o.37 6168.08 6206.55 6235.89 6277.74 6312,39 6342.69 6376.3o 6407.46 6440.03 6489,28 Projected Survey Continued... 11 November, 1998 - 11:59 - 3 - DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Survey Report for 07-33A Your Ref: API-500292180901 Job No. AKMWS0395, Surveyed: 18 October, 1998 Alaska State Plane Zone 4 PBU EOA DS 07 Comments Measured Depth (ft) 11416.96 11420.00 12761.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 8962.75 3382.03 N 5196.17 E 8962.60 3380.68 N 5198.89 E 8930.82 3285.11 N 6486.41 E Comment Tie-on Survey Window Point Projected Survey 11 November, 1998 - 11:59 - 4 - DrillQuest GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrie NO. 12022 Companl Alaska Oil & Gas Cons Comm Attn: Loft Taylor 3001 Porcupine Drive Anchorage, AK 99501 11/5/98 cj~.ooc,, Field: Prudhoe Bay Floppy LIS Well Job # Log Description Date BL Sepia Disk Tape D... 2-~8~ 98550 .~-.O~ ~~/~ ~80~0~ I ! 1 D.~. ~8-~0~ 98.5 ~-~0~ ~~!~ ~80e2~ 1 I ! *(REDO- TO CORRECT D~PTH SHIFTS) , .... ~ ~ , SIGNE DATE: .......... Alaska Oil & Gas ~ns. uu~.~aiss~0n And~0rage Please sign and return one copy of this transmiltal to Sherrie at the above address or fax 1o (907) 562-6521, Thank MEMORANDUM  aska TO: David Johnston, Chairman State of Alaska Oil and Gas Conservation Commission DATE: 9/28/98 THRU: Blair Wondzell, P. I. Supervisor FILE NO: .DOC FROM: Larry Wade, SUBJECT: Petroleum inspector BOP Test CDR #1 PBU DS7-33A PTD 98-144 September 28,1998: I traveled to PBU DS-7 to witness a BOP test on the Trans Ocean rig. The BOP test was much improved over the last test witnessed on this rig. They are performing the test by written procedures which offers consistency between crews. The rig is still having maintenance problems which is inherent to a concept rig and is basically still in the construction phase. They are not prepared for cold weather and have plans to make it ready for winter but they are running behind. SUMMARY: I witnessed a BOP test on CDR #1, 0 failures, 4 hours. Attachments: agSgi2fe.xls cc; NON-CONFIDENTIAL : STATE OF ALASKA ..... OIL AND GAS CONSERVATION COMMISSION Coil Tubing Unit BOPE Test Report OPERATION: Drlg: Drlg Contractor: Operator: Well Name: Casing Size: Test: Initial X Workover: DATE: Trans Ocean/Nabors Rig No. ~ PTD # g8-144 Rig Ph.# ARCO Rep.: Bob Mize DS 7-33A Rig Rep.: Set @ 10141' LocalJon: Sec. ~ Weekly Other g/28/98 65g-5545 Terry Wasyluk 34 T. 11N R. 14E Meridian Umiat BOP STACK: Coil Tubinq Unit: Pipe/Slip Rams Pipe/Slip Rams Blind Rams Reel Isolation Valve Deoiovment: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Test Quan. Pressure P/F 2 350/3500 P 1 350/3500 P 350/3500 350~500 350~500 350/3500 CHOKE MANIFOLD: Quan. No. Valves 10 No. Flanges 21 Manual Chokes 2 Hydraulic Chokes 1 ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Bti's: Test Pressure 350/35O0 35O/35OO Functioned Functioned P/F P P P P MUD SYSTEM: Visual Alarm MISC. INSPECTIONS: Tdp Tank X X Location Gen.: ok Pit Level Indicators X X Housekeeping: ok Meth Gas Detector X X Permit to drill: X H2S Gas Detector X Standing Order Posted 2 ~ 2000 2,950 J 1,500 minutes 15 minutes 30 X Remote: Psig. sec. sec. X X Well Sign X Dd. Rig ok Hazard Sec. X TEST RESULTS: Number of Failures: 0 ,Test Time: 4.0 Hours. Number of valves tested 20 Repair or Replacement of Failed Equipment will be made within days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 If your call is not returned by the inspector within 12 hours please contact the P. !. Supervisor at 279-1433 REMARKS: Distribution: orig-Well File c - Oper./Rig c - Database c - Tdp Rpt File c -Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Larry Wade Form Revised 2/20/97 L.G. Agggi2fe 9/30/98 -2N'r :~NOWL£,.~, ~OVE~,,NOR ALASK& OIL A~D GAS CONSERVATION CO~E~IISSION _'.301 F©RCUPiNE ,_'2'RIVE -NCHORAGE..~,_ASKA 99501-3192 :NONE: .:37'~ 279-1433 z:',X: _:07) 276-7542 Auaust 14. 1998 Erin *I. Oba Engineering Supcr¥isor ARCO Alaska. Inc. PO Box 100360 Anchorage, AK 99510-0360 Prudhoe Bay Unit 7-33A ARCO Alaska. Inc. Permit No. ~8-144 Sur. Loc. !068'FNL. 522'FWL. SEC .:-4. TI IN. RI4E. UM Btmnholc Loc. 2330'FSL 136'FWL. SEC 2,6. Ti 1N. R14E. UM Dear Ms. Oba: Enclosed is the approved application £or permit to redrill thc above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agcncies, and docs not authorize conducting drilling operations until all other required permitting dctcrminations arc made. Blov,-out prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of thc Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting t!le,,-Gommis~mn petroleum field inspector on the North Slope pager at 659-3607. David W. ]ob, r~ston '",., -' Chairman BY ORDER OF THE COMMISSION dlffEnclosurcs CC' Department of Fish ~.~ Game. Habitat Scctioll v~-/o oriel. Department of Environmcntal ConscrYation w;o cncl. .... STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 I la. Type of Work Drill_ Redrill ~ I lb. Type of Well Exploratory_ Stratigraphic Test_ Development Oil~X Re-Entry_ Deepen -I Service_ Development Gas m Single Zone ~ Multiple Zone_ 2. Name of Operator 5.Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 60' 3. Address 6. Property Designation P.O. Box 100360 _~ Prudhoe Bay Field Anchorage, AK 99510-0360 ADL 028308 Prudhoe Bay Oil Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 1068' FNL, 522' FWL, Sec 34, T11N, R14E, UM Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 2196' FSL, 243' FEL, Sec 27, T11 N, R14E, UM 7-33A #U-630610 At total depth 9. Approximate spud date Amount (Proposed) 2330' FSL, 136' FWL, Sec 26, T11N, R14E, UM August, 1998 $200,000 12. Distance to nearest I 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line No Close Approach 12500' MD / 8887' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) kickoff depth 10750' MD Maximum hole angle 90° Maximum surface 2500 psig At total depth (TVD) 3400 psig @ 8800' 18. Casing program Setting Depth Size Specification Top Bottom Quantity of cement Hole Casing Weight Grade Coupling LenCh MD TVD MD TVD (include stage data) 3-3/4" 3-3/16" 6.2 L-80 TC II 2300' 10200' 8636' 12500' 8887' 22 bbls 19. To be completed for Redrill, Re-entry, and Deepen Operations. U | \ t ~ [, ~, ~ I ~ ~ Present well condition summary Total depth: measured 11209 feet Plugs(measured) Bottom tagged @ 11066' MD (3/15/98) true vertical 9083 feet Effective depth: measured 11066 feet Junk (measured) true vertical 8962 feet Casing Length Size Cemented Measured depth True Vertical depth Conductor 110' 20" 2150# Poleset 110' 110' Surface 3305' 13-3/8" 2000 Sx CS III & 3365' 3047' 400 Sx Class G & 200 Sx CS 1 Production 10353' 9-5/8" 629 Sx Class G & 400 Sx CS I 10413' 8415' Liner 861' 7" 450 ex Class G 11207' 9080' IVE Perforation depth: measured 10828'-10834'; 10999'-11014'; 11040'-11044'; 11054'-11078'; 11087'-11093' RECE truevertical 8762'-8767'; 8905'-8918'; 8939'-8942'; 8951'-8971" 8979'-8984' JUL 24 1998 Alaska 0il & Gas Cons. C0ml 20. Attachments Filing fee ~ Property plat _ BOP Sketch __x Diverter Sketch _ Drilling program __x Anchorage Drilling fluid program __ Time vs depth pict _ Refraction analysis _ Seabed report~ 20 AAC 25.050 requirements 21. I hereby certily that the foregoing is true and correct to the best of my knowledge Questions: Call M/ke Niznik @ 263-4561. Signed ~:::2'~ %o ~ Ti,lle Er~gineering Supervisor Date 7- "~.~-¢ ¢ Erin Oba Commission Use Only Prepared by Paul Rauf 263-4990 Permit N.uj'nber i AP, number I Appr°val date ~ / ~'~ ~O) See cover letter for '7 - l'-f ,-f 5o- 0 2,. I 0 ' 01 I ~' other requirements Condiiions of approval Samples required _Yes 4L~NO Mud Icg required ~, _ Yes __,)(No Hydrogen sulfide measures .~' Yes _ No Directional survey required _,,,~Yes _ No Required working pressure for BOPE _ 2M; _ 3M; _ SM; _ 10M; _ 15M ._X 3500 psi for CTU Other: David0riginalw.SignedjohnstonBY by order of Commissioner commission Date O Approved by the Form 10-401 Rev. 7-24-89 Subm te DS 7-33A CT Sidetrack and Completion Intended Procedure Objective: Plugback existing wellbore. Direcfionally drill a horizontal well from the existing wellbore. Complete with 3-3/16" cemented liner. Intended Procedure: * Set a mechanical whipstock at ~ 10,750'. * RU CTU and BOPE. Test BOPE to 3500 psi. Cement squeeze the current perforations and plugback the existing completion to -10,750' md. Mill window at ~ 10,750'. Drill 10' of formation and perform leak off test to 0.5 ppg above the highest anticipated mud weight (8.9 ppg Flo Pro as drilling fluid). Directionally drill 3-3/4" x 1750' horizontal well to access Zone 1 reserves. Build angle to -90°. * Run and cement 3-3/16" liner to TD. * Perforate selected intervals. * Return well to production. ARCO Alaska, Inc. Structure ' D.S. 7 [Teld ' Prudhoe ~oy Well - Location : North Slope, Alaska! (feet) -> ¢..~I0 ~,400 4~50,3 4600 ¢7~1C3 4~30 4UbO ~)CX~ '-,'. G~ 5200 5300 ~ 550;:) 5600 5700 51~30 5000 E~:X3Q 6100 6.~1C30fi3K)O 640C) 6513(I 66(313 --~'- 1-,e on - 8594 50 lvd. 3300.: z. N, ~7 02 [ 7--55;hs 7-5~n$ T.13. & &nc of ~-.i1¢ - BaB?.I3~ T~, 53G1.75 N, 6382.40 £ .67 Inc, laTOO.OO lad. a594 50 -vt, ~$ 47 vs 7-3~hs  7- ~ 3C ~ 7 - 55ihs T~ ~ Eno o~ 5~ld~u~n - 95.5~ I.~c, 12611.95 Md. aSET.~ 1~, 7;~.75 vs , I' ~1C~ I ~ ....I I I I '-'1~;~ I I I I I I w"~f I I ~1 ' I ~1 " I ' ~ ' I ~ : w "r w I VertTc~tSection(feet)-> Azimuth 56.08 with reference O.O0 N, O,O0 E from 7-35 1 .~Ofl 3]00 I.. 7-33A Measured Depth Inclin. Degrees Azimuth Degrees True Vert Depth True Coordinates Dogleg Deg/100 ft Vert Sect Tool Face 10700.00 10750.00 10800.00 10832.94 10900.00 11000.00 11100.00 11200.00 11204.50 11300.00 11400.00 115OO.OO 11600.00 11700.00 11800.00 11900.00 12000.00 12056.69 12100.00 12200.00 12300.00 12400.00 12500.00 12600.00 12611.93 33.67 33.34 24.62 19.00 31.79 5O.87 69.96 89.05 89.91 89.91 89.92 89.92 89.93 89.94 89.94 89.95 89.96 89.96 90.40 91.43 92.45 93.46 94.47 95.47 95.59 71.90 71.22 75.84 81.00 82.70 83.75 84.34 84.80 84.82 86.39 88.03 89.67 91.31 92.95 94.59 96.23 97.88 98.81 97.76 95.33 92.90 90.47 88.03 85.59 85.29 8594.50 3300.14 N 4637.02 E 8636.19 3308.87 N 4663.21 E 8679.90 3315.86 N 4686.36 E 8710.47 3318.38 N 4698.32 E 8770.93 3322.35 N 4726.74 E 8845.68 3329.98 N 4792.02 E 8894.82 3338.92 N 4878.12 E 8912.96 3348.16 N 4975.55 E 8913.00 3348.57 N 4980.03 E 8913.15 3355.89 N 5075.25 E 8913.30 3360.76 N 5175.13 E 8913.44 3362.77 N 5275.10 E 8913.57 3361.91 N 5375.10 E 8913.68 3358.19 N 5475.02 E 8913.79 3351.61 N 5574.80 E 8913.88 3342.18 N 5674.35 E 8913.96 3329.89 N 5773.59 E 8914.00 3321.67 N 5829.68 E 8913.86 3315.43 N 5872.54 E 8912.27 3304.04 N 5971.87 E 8908.89 3296.87 N 6071.54 E 8903.73 3293.93 N 6171.36 E 8896.82 3295.24 N 6271.10 E 8888.15 3300.79 N 6370.56 E 8887.00 3301.73 N 6382.40 E 0.00 1.00 18.00 18.00 19.10 19.10 19.10 19.10 19.10 1.64 1.64 1.64 1.64 1.64 1.64 1.64 1.64 1.64 2.63 2.63 2.63 2.63 2.63 2.63 2.63 4640.O2 4666.21 4689.37 4701.33 4729.75 4795.04 4881.14 4978.59 4983.07 5O78.29 5178.17 5278.15 5378.14 5478.O7 5577.84 5677.38 5776.61 5832.69 5875.55 5974.86 6074.53 6174.34 6274.09 6373.55 6385.39 -131.00 167.00 163.00 4.00 2.00 1.00 1.00 1.00 89.00 89.00 89.00 89.00 89.00 89.00 89.00 89.00 89.00 -67.00 -67.00 -67.00 -67.OO -67.00 -67.OO -67.00 Prepared by Baker Hughes INTEQ 07/23/98 Page 1 DS 7-33A Proposed CT Horizontal Sidetrack 5-1/2" Camco BAL-O SSSV @ 2223' 13-3/8" Casing Shoe @ 3365' 5-1/2" Tubing 0'- 10,141' 4-1/2" Tubing 10,160'- 10,259' 9-5/8"x5-1/2" Baker FB-1 Packer @ 10,141' 4-1/2" GS FN on top of liner @ +- Casing Shoe @ 10,413' 10,200' Window cut in 7" casing @ 10,750' - 10,755' Original perforations cement sqz'd 3-3/4" Open Hole 3-3/16" TC II Liner TD @ +- 12,500' 7" Casing Shoe @ 11,209' C T Drilling Wellhead Detail ~ CT Injector Head Methanol Injection -- 7" Riser OtLs 7"W LA Quick Connect ~ Annular BOP (Hydril),7-1/16" ID 5000 psi WP Alignment Guide Flange 7-1/16", 5M Ram Type Dual Gate BOPE ~- Flanged Fire Resistant Kelly Hose to Dual Choke Manifold \ HCR Man Cutters or Combination Cutter/Blinds Slip/Pipe Rams Manual Valves Drilling spool 7-1/16", 5M by 7-1/16", 5M Manual over Hydraulic Ram Type Dual Gate BOPE 7-1/16" ID with Pipe/Slip Rams 2" Pump-In Manual Master Valve 0.458' (5.5") Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold Hanger 9-5/8" Annulus 13-3/8" Annulus Shop Fuel Boilers Water Mu~ Tanks Pump Fire Ext. Fire Ext. I 60/40 ,~Pipe rack Ext. Dowell Drilling Equipment Trailer Preferred Major Equipment Layout for CT Drilling · WELL PERMIT CHECKLIST COMPANY FIELD & POOL INIT CLASS _,~ ~ t.J WELL NAME ~2 5 (J(,.. '7- 33 )/~Jr PROGRAM: exp [] dev ~[ redrll.J~serv [] wellbore seg I] ann. disposal para req 0 i' C, GEOL AREA .~ O~ 0 UNIT# / ~/ (..¢ ~"'~ ON/OFF SHORE ADMINISTRATION A~ DATE .., 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING APP_R., DATE. 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ~'-(~'J_ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... GEOLOGY (~DN DATE ANNULAR DISPOSAL APPR DATE N N ~ N (~N 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide measures. J Y N 31. Data presented on potential overpressure zone?.~...... Y N 32. Seismic analysis of shallow gas zon~.~.. ......... Y N 33. Seabed condition su~~re) ............. Y N 34. C~rogress repods ....... Y N ory only] 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N (B) will not co~inate freshwater; or cause drilling waste... Y N to surface; ~ (C) will not impair mech~ntegrity of the well used for disposal; Y N (D) will not damage producing Tbr-ma~on or impair recovery from a Y N pool' and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N N Y N NN ENGINEERING: UIC/Annular JDH · COMMISSION: DWJ RNC Comments/Instructions: M:chel~list rev 05/29/98 dlf: C:\msoffice\wordiar~\diana\checklist Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * . * . ............................ * * ....... SCHLUM~ERG~ ....... * . ............................ * COMPANY NAME : ARCO ALASKA INC. WELL NAME : DS 7-33A FIELD NANiE : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API ~ER : 500292180901 REFERE2~CE NO : 98561 LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-NOV-1998 16~.~-~ PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/11/ 3 ORIGIN : FLIC REEL NAME : 98561 CONTINUATION # : PREVIOUS REEL : COM~IENT : ARCO ALASKA, PRUDHOE BAY, DS 7-33A, API #50-029-21809-01 **** TAPE HEADER **** SERVICE NA~E : EDIT DATE : 98/11/ 3 ORIGIN : FLIC TAPE NAME : 98561 CONTINUATION # : 1 PREVIOUS TAPE : COM~IENT : ARCO ALASKA, PRUDHOE BAY, DS 7-33A, API #50-029-21809-01 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: DS 7-33A API NUMBER: 500292180901 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 3-NOV-98 JOB NUMBER: 98561 LOGGING ENGINEER: J SPENCER OPERATOR WITNESS: JOHIVSON SURFACE LOCATION SECTION: 34 TOWNSHIP: 1 IN RANGE: 14E FNL : 1068 FSL: FEL : FWL : 522 ELEVATION(FT FROM MSL O) KELLY BUSHING: 60. O0 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-NOV-1998 16'~,~' BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: SDN LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: JUN-98 LOGGING COMPANY: WESTERN ATLAS BASELINE DEPTH 88888.0 10754.0 10751.5 10751.0 10747.5 10745.5 10743.5 10741.5 10734.0 10721.5 10714.5 10694.5 10694.0 10685.0 10684.5 10682.0 10680.5 10679.0 10677.0 10673.0 10671.5 10653.5 10652.0 10651.5 10643 5 10641 5 10640 5 10639 0 10638 5 10636 5 10625 0 10623 5 10614 0 10604 5 10601.0 1 0599.0 10595.5 10594.0 10590.0 10588.5 10586.5 10578.5 1 0577.5 10574.5 10555.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNT 88887.0 88889.0 10750.5 10744.5 10734.5 10720.5 10696.0 10685.5 10681.0 10679.5 10675.5 10672.0 10652.5 10650.0 10642.5 10639.5 10637.0 10625.0 10600.0 10595.0 10587.5 10577.5 10575.0 10755.0 10751.0 10748.0 10744.5 10742.5 10734.5 10715.0 10695.0 10685.5 10679.0 10672.0 10652.0 10642.5 10639.5 10637.0 10624.5 10615.0 10607.0 10600.0 10595.0 10590.0 10587.0 10577.5 10556.0 PAGE: LIS Tape Ver~'flcat~on Listing Schlumberger Alaska Computing Center 10553.5 10552.0 10538.0 10537.5 10529.5 10526.5 10521.0 10518.0 10516.5 1O508.0 10506.5 10501.5 10496.0 10492.5 10482.0 10481.0 10471.5 10468.0 10463.0 10462.5 10453.0 10452.5 10450.0 10449.5 10445.0 10443.0 10441.0 10440.5 10437.5 10434.5 10428.5 10426.5 10421.5 10417.0 10415.5 10415.0 10411.5 10410.0 10408 5 10405 5 10403 0 10398 5 10393 5 10389 5 10381 0 10372 5 10370 0 10368 5 10367 5 10364.0 10360.5 10346.5 10344.5 10342.5 10326.5 10324.0 10553.0 10537.0 10524.5 10521.0 10517.0 10505.0 10500.0 10495.0 10481.0 10470.0 10461.5 10451.0 10449.0 10443.0 10440.5 10438.5 10432.5 10427.0 10425.5 10421.5 10416.5 10413.0 10410 5 10408 0 10406 5 10404 0 10401 0 10398 0 10391 0 10387 0 10379 5 10372 0 10369.0 10366.5 10362.0 10345.5 10342.5 10326.0 10323.0 10552.5 10536.5 10529.5 10517.0 10508.0 10495.0 10481.5 10469.5 10462.0 10453.0 10449.0 10440.5 10438.5 10415.5 10404.0 10368.5 10362.0 10345.0 3-NOV~1998 16~ PAGE: LIS Tape Ver~lf~ication Listing Schlumberger Alaska Computing Center 3-NOV-1998 16:~i 10310.0 10309.5 100.0 99.5 $ REMARKS: 102.5 CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE MCNL DATA AQUIRED ON ARCO ALASKA'S DS 7-33 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE SDN GAMMA RAY, ALSO PASS #1 ArRAT AND THE SDN GAMMA RAY, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. THIS LOG WAS TIED INTO THE PARENT DS 7-33 WELL DOWN TO THE KOP AT 10767 (DEPTH PER ALI TURKER AT SPERRY-SUN). $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O0'lCO1 DATE : 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: O . 5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 12713.0 9997.5 CNT 12713.0 10000.5 $ CURVE SHIFT DATA - PASS TO PASS (FiEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNT REMARKS: THIS FILE CONTAINS CASED HOLE MCNL PASS #1. NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA THERE ARE LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-NOV-1998 16'~' PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 2 3 4 5 66 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 66 0 66 0 73 20 66 1 0.5 FT 51 0 FT 68 1 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NtrM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 12713. 000 NRAT. CNT 13. 637 DEPT. 9997. 500 NRAT. CNT -999. 250 GRCH. CNT 62. 769 NCNT. CNT 7819. 320 FCNT. CNT GRCH. CNT 32. 808 NCNT. CNT -999. 250 FCNT. CNT 459.328 -999.250 ** END OF DATA ** LIS Tape vw-r~f ication Listing Schlumberger Alaska Computing Center 3-NOV-1998 16..-ud PAGE: **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE : 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 12702.9 12396.9 CNT 12700.9 12397.4 $ CURVE SHIFT DATA - PASS TO PASS (FiEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH CNT 88888.0 88887.0 88887.0 12696.5 12695.5 12692.5 12690.5 12683.0 12682.0 12677.0 12677.0 12671 . 5 12671 . 0 12655.0 12657.0 12654.5 12652.0 12639.0 12638.0 12640.5 12632.5 12631.0 12626.5 12628.5 LIS Tape Ve~-~cation Listing Schlumberger Alaska Computing Center 3-NOV-1998 16~- PAGE: 12618.0 12605.5 12603.0 12602.5 12594.0 12591.5 12586.5 12580.5 12569.5 12565.5 12565.0 12559.0 12547.0 12543.0 12540.0 12529.0 12527.0 12524.0 12503.0 12502.5 12498.0 12496.0 12485.0 12474.5 12471 0 12469 0 12468 5 12465 0 12450 0 12443 5 12434.0 12431.0 12425.5 12418.5 100.0 $ 12616.5 12603.5 12602.0 12593.0 12585.0 12567.5 12563.5 12542.5 12526.5 12503.5 12498.5 12497.0 12474.0 12471.5 12468.5 12464.5 12448.5 12429.0 12417.0 98.5 12605.5 12602.0 12592.5 12581.0 12564.5 12557.5 12546.0 12538.5 12528.0 12522.0 12500.0 12484.0 12469.0 12444.0 12434.0 12424.5 99.0 REMARKS: THIS FILE CONTAINS CASED HOLE MCNL PASS #2. THE DEPTH SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO NRAT PASS #2 AND ArRAT PASS #1, CARRYING ALL MCNL CURVES WITH THE NRAT SHIFTS. $ LIS FORMAT DATA LIS Tape versification Listing Schlumberger Alaska Computing Center 3-NOV-1998 16:~_~- PAGE ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 20 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 ET 11 66 51 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** . NAME SERV UNIT SERVICE API API API API FILE NUMB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNT GAPI O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNT CPS O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNT O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 12702.992 GRCH. CNT 41.691 NCNT. CNT -999.250 FCNT. CNT NRAT. CNT -999.250 DEPT. 12396.992 NRAT. CNT -999.250 GRCH. CNT 51.217 NCNT. CNT -999.250 FCNT. CNT -999.250 -999.250 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 3-NOV-1998 16"..~~ PAGE: **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION · O01CO1 DATE : 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT O. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS CNT $ REMARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF PASSES 1 & 2. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORMAT DATA ** DATA FO~T SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 5 66 6 73 LIS Tape VerSification Listing Schlumberger Alaska Computing Center 3 -NOV- 1998 1 PAGE: 10 TYPE REPR CODE VALUE 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUM~ NUFIB SIZE REPR PROCESS ID ORDER # LOG TYPE CUSS MOD NUM~ SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNAV GAPI O0 000 O0 0 3 1 1 4 68 0000000000 CVEL CNAV F/HR O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNAV CPS O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNAV CPS O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNAV O0 000 O0 0 3 t 1 4 68 0000000000 ** DATA ** DEPT. 12713.000 GRCH. CNAV 62.769 FCNT. CNAV -999.250 NP~T. CNAV -999.250 DEPT. 9997.500 GRCH. CNAV 32.808 FCNT. CNAV -999.250 NRAT. CNAV -999.250 CVEL . CNA V CVEL . CNA V -999.250 NCNT. CNAV -999.250 NCNT. CNAV -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Ve'~ication Listing Schlumberger Alaska Computing Center 3-NOV-1998 16~J PAGE: 11 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS AU3PIBER: 1 DEPTH INCREF~_aVT: 0.1000 FILE SUFff/~ARY VENDOR TOOL CODE START DEPTH MCNL 12734.5 $ LOG HEADER DATA STOP DEPTH 9983.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO) : 21-0CT-98 RELOO35D 12727.0 12726.0 9998.0 12712.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAMMA RAY GR MCNL MEM COMPENSATED NEUTRON MCNL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : .. LIS Tape Ve~cation Listing Schlumberger Alaska Computing Center 3-NOV-1998 16~.' PAGE: 12 FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): -20 FAR COUNT RATE HIGH SCALE (CPS): 1080 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 19500 TOOL STANDOFF (IN): REMARKS: 1. Depth correlated to a Xerox copy (provided by client) of an ARCO PDC log. The xerox had no date nor any other identification on it. Used GR character at 10642-10643 ft FiD as primary depth reference. This adjustement placed the rest of the log in VERY close depth correlation to the Sperry-Sun MWD log dated 30-SEP-98 to 19-0CT-1998. 2. Depth offset used for both Main and Repeat passes = + 17 feet. THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 O. 1 9 65 FT 11 66 36 LIS Tape Ve~r~ication Listing Schlumberger Alaska Computing Center 3~NOV-1998 PAGE: 13 TYPE REPR CODE VALUE 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUM~ NUAIB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) DEPT FT O0 000 O0 0 4 1 1 4 68 0000000000 CVEL PS1 F/HR O0 000 O0 0 4 1 1 4 68 0000000000 GR PS1 GAPI O0 000 O0 0 4 1 1 4 68 0000000000 NCNT PS1 CPS O0 000 O0 0 4 1 1 4 68 0000000000 FCNTPS1 CPS O0 000 O0 0 4 1 1 4 68 0000000000 NRAT PS1 O0 000 O0 0 4 1 1 4 68 0000000000 CCLD PS1 V O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 12734.500 CVEL.PS1 -1.702 GR.PS1 -999.250 NCNT. PS1 FCNT. PS1 -999.250 lVRAT. PS1 -999.250 CCLD.PS1 -999.250 DEPT. 9983.000 CVEL.PS1 -999.250 GR.PS1 -999.250 NCNT. PSi FCNT. PS1 -999.250 NP~T. PS1 -999.250 CCLD.PS1 84.874 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAFiE : EDIT .004 SERVICE · FLIC VERSION : O01CO1 DATE : 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Ve~i~ication Listing Schlumberger Alaska Computing Center 3-NOV-1998 16"~.~~' PAGE: 14 **** FILE HEADER **** FILE NA~E : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE · 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.1000 FILE SO?4MARY VENDOR TOOL CODE START DEPTH MCNL 12734.5 $ LOG HEADER DATA STOP DEPTH 12384.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): 21-0CT-98 RELOO35D 12727.0 12726.0 9998.0 12712.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER GR GAlenA RAY GR MCNL MEM COMPENSATED NEUTRON MCNL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : LIS Tape VeSt'cation Listing Schlumberger Alaska Computing Center 3-NOV-1998 16~--~-~ PAGE: 15 FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL).. MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): -20 FAR COUNT RATE HIGH SCALE (CPS): 1080 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 19500 TOOL STANDOFF (IN): REMARKS: 1. Depth correlated to a Xerox copy (provided by client) of an ARCO PDC log. The xerox had no date nor any other identification on it. Used GR character at 10642-10643 ft ND as primary depth reference. This adjustement placed the rest of the log in VERY close depth correlation to the Sperry-Sun MWD log dated 30-SEP-98 to 19-0CT-1998. 2. Depth offset used for both Main and Repeat passes = + 17 feet. THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.1 9 65 FT 11 66 36 LIS Tape Ver~cation Listing Schlumberger Alaska Computing Center 3-NOV-1998 16~-' PAGE: 16 TYPE REPR CODE VALUE 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT O0 000 O0 0 5 1 1 4 68 0000000000 CVEL PS2 F/HR O0 000 O0 0 5 1 1 4 68 0000000000 GR PS2 GAPI O0 000 O0 0 5 1 1 4 68 0000000000 NCNT PS2 CPS O0 000 O0 0 5 1 1 4 68 0000000000 FCNT PS2 CPS O0 000 O0 0 5 1 1 4 68 0000000000 NRAT PS2 O0 000 O0 0 5 1 1 4 68 0000000000 CCLD PS2 V O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 12734.492 CVEL.PS2 1.008 GR.PS2 -999.250 NCNT. PS2 FCNT. PS2 -999.250 NRAT. PS2 -999.250 CCLD.PS2 -999.250 DEPT. 12383.992 CVEL.PS2 -999.250 GR.PS2 -999.250 NCNT. PS2 FCNT. PS2 -999.250 NRAT. PS2 -999.250 CCLD.PS2 85.000 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/11/ 3 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape ver-',~ication Listing Schlumberger Alaska Computing Center 3-NOV-1998 PAGE: 17 **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/11/ 3 ORIGIN : FLIC TAPE NAME : 98561 CONTINUATION # .. 1 PREVIOUS TAPE CO~4ENT : ARCO ALASKA, PRUDHOE BAY, DS 7-33A, API #50-029-21809-01 * * * * REEL TRAILER * * * * SERVICE NAME : EDIT DATE : 98/11/ 3 ORIGIN : FLIC REEL NAM~ : 98561 CONTINUATION # : PREVIOUS REEL : CO~4ENT : ARCO ALASKA, PRUDHOE BAY, DS 7-33A, API #50-029-21809-01 Sperry-Sun Drilling Services LIS Scan Utility Thu Apr 01 11:20:01 1999 Reel Header Service name ............. LISTPE Date ..................... 99/04/01 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/04/01 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPEP~ATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPEP~ATOR WITNESS: RECEIVED .APR 0 6 1999 7-33A 5 o o 2 9 ~. 18 o 9 o i A~aska Oit & Gas Cons. Commission ARCO ALASKA, INC. A~o[~(~e SPERRY-SUN DRILLING SERVICES 01-APR-99 MWD RUN 1 MWD RUN 2 MWD RUN 7 AK-MW-80395 AK-MW-80395 AK-MW-80395 D. LONG D. LONG D. LONG B. MIZE B. MIZE M. JOHNSON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 9 AK-MW-80395 W. JACKSON M. JO~L~SON MWD RUN 11 AK-MW-80395 W. JACKSON M. JOHNSON MWD RUN 12 AK-MW-80395 W. JACKSON M. JOHNSON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 13 AK-MW-80395 W. JACKSON A. KIRK MWD RUN 14 AK-MW-80395 W. JACKSON A. KIRK SURFACE LOCATION SECTION: 34 TOWNSHIP: liN RANGE: 14E FNL: 1068 FSL: FEL: FWL: 522 ELEVATION (FT FROM MSL 0) KELLY BUSHING: 60.00 DERRICK FLOOR: .00 GROUND LEVEL: .00 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 7.000 10750.0 2ND STRING 5.500 10141.0 3RD STRING 4.500 10259.0 PRODUCTION STRING 4.000 12761.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1,2,7,9,11,12,13 AND 14 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (SGRD) . 3. MWD RUNS 3,4,5,6,8 AND 10 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 4. MWD DATA HAS BEEN DEPTH SHIFTED/CORRECTED USING (C GR CNT S GAPI REAL) PROVIDED BY DEDE SCHWARTZ OF ARCO ALASKA, INC. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12761'MD, 8871'SSTV-D. SROP = SMOOTHED P~ATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10755.5 12732.5 ROP 10773.5 12759.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH 10755.5 10770 10772 10773 10774 10784 10786 10795 10796 10797 10800 10802 10804 10806 10809 10822 10824 10829 10830 10833 10835 10838 10839 10843 10846 10848 10850 10870 10873 10875 10877 10881 10884 10885 10895 10918 10922 10926 10927 10929 10931 10933 10935 10937 10939 10941 10946 10947 10950 10952 10975 .5 .5 .5 0 5 0 0 0 0 0 5 0 5 5 0 5 0 5 0 5 0 0 0 5 0 0 5 5 0 5 0 0 5 0 0 5 0 5 5 5 5 5 5 5 5 0 5 0 5 5 GR 10757 5 10772 5 10774 0 10775 0 10775 5 10786 0 10787 5 10798 0 10800 0 10800 5 10802 0 10805 5 10807 0 10809 5 10812 5 10823 5 10827 5 10830 0 10832 0 10834 5 10838 0 10840 0 10841 0 10844 5 10848 5 10850 0 10852 5 10872 0 10875 0 10875 5 10878 0 10881 5 10885 0 10886 0 10895 5 10919 0 10923 5 10927 5 10928 5 10931 5 10932 5 10934 5 10936 0 10938 5 10940 5 10943 5 10947 0 10949 0 10951 5 10954 0 10977 0 10977 10997 10999 11000 11002 11004 11006 11007 11008 11012 11018 11020 11028 11031 11063 11067 11070 11081 11082 11086 11087 11095 11108 11111 11123 11126 11127 11130 11132 11133 11140 11142 11144 11153 11156 11159 11162 11165 11172 11175 11179 11181 11183 11185 11186 11187 11189 11199 11207 11210 11211 11216 11218 11220 11222 11327 11328 0 5 0 5 0 5 0 0 5 0 0 0 0 5 5 5 0 0 5 0 5 0 0 0 5 5 5 5 5 5 0 5 0 0 0 0 5 0 0 0 5 0 5 0 5 5 0 5 0 5 5 5 0 5 5 5 5 10978 10998 11001 11002 11004 11006 11008 11009 11010 11013 11020 11022 11029 11032 11066 11068 11072 11079 11082 11086 11088 11095 11108 11111 11123 11126 11127 11129 11132 11134 11139 11141 11143 11153 11156 11158 11162 11164 11171 11175 11180 11182 11183 11184 11186 11188 11189 11200 11206 11209 11211 11216 11219 11222 11223 11327 11328 5 5 0 5 0 5 0 0 5 0 0 0 0 5 0 0 5 5 5 5 0 0 5 5 5 5 5 5 5 0 0 5 5 0 0 5 0 5 5 0 5 0 0 0 0 0 5 5 5 5 0 0 0 5 5 5 5 11354 11357 11371 11372 11550 11559 11563 11573 11590 11591 11600 11607 11613 11627 11642 11652 11677 11678 11695 11713 11715 11757 11768 11774 11776 11814 11843 11868 11869 11871 11873 11992 11996 12000 12004 12007 12135 12138 12140 12141 12144 12169 12174 12177 12236 12239 12262 12264 12291 12297 12300 12304 12331 12337 12342 12344 12347 11353 11355 11370 11371 11550 11559 11563 11573 11585 11588 11596 11603 11611 11626 11634 11642 11666 11668 11687 11703 11705 11744 11757 11763 11766 11801 11829 11854 11856 11858 11862 11978 11981 11985 11989 11992 12125 12131 12133 12135 12137 12162 12168 12172 12231 12233 12258 12261 12286 12294 12300 12303 12330 12335 12340 12343 12345 5 5 5 5 0 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 0 0 5 0 5 5 5 5 5 5 5 0 5 0 5 5 5 5 5 5 0 5 5 5 0 5 0 0 5 5 0 5 0 5 5 0 0 12366 0 12368 12371 12382 12442 12456 12557 12560 12569 12571 12586 12592 12595 12604 12612 12616 12620 12633 12646 12654 12659 12759 $ MERGED DATA SOURCE PBU TOOL CODE MWD 1 MWD 2 MWD 7 MWD 9 MWD 11 MWD 12 MWD 13 MWD 14 $ REMARKS: 12364 5 12366 0 12370 0 12380 0 12440 0 12453 0 12558 5 12561 0 12567 0 12568 0 12588 0 12593 5 12596 5 12604 5 12612 0 12616 5 12621 5 12635 0 12647 5 12655 5 12660 5 12760 5 MERGED MAIN PASS. $ Data Format Specification Record BIT RUN NO MERGE TOP 10775 0 10901 0 11074 0 11420 0 11517 0 11548 0 11661 0 12100 0 Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 MERGE BASE 10901 0 11074 0 11420 0 11517 0 11548 0 11661 0 12100 0 12761 0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 Name Min Max Mean Nsam DEPT 10755.5 12759 11757.2 4008 ROP 1.86 1683.47 69.4198 3972 GR 16.72 379.52 79.3278 3955 First Last Reading Reading 10755.5 12759 10773.5 12759 10755.5 12732.5 First Reading For Entire File .......... 10755.5 Last Reading For Entire File ........... 12759 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10757.5 10874.5 ROP 10775.0 10901.0 $ LOG HEADER DATA DATE LOGGED: 29-SEP-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 10901.0 10775.0 10901.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM Ai~GLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 33.3 38.4 TOOL NUMBER NGP SPC 258 3.750 3.8 FLO-PRO 8.70 64.0 8.5 5.8 .000 .000 .000 .000 16.1 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 1 API 4 1 68 4 2 ROP MWD 1 FT/H 4 1 68 8 3 First Last Name Min Max Mean Nsam Reading Reading DEPT 10757.5 10901 10829.2 288 10757.5 10901 GR 16.72 163.92 38.8465 235 10757.5 10874.5 ROP 13.13 1683.47 142.705 253 10775 10901 First Reading For Entire File .......... 10757.5 Last Reading For Entire File ........... 10901 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEA~DER FILE N-UMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10874.5 11073.5 ROP 10902.5 11073.5 $ LOG HEADER DATA DATE LOGGED: 01-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 11074.0 10901.0 11074.0 HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 41.3 89.8 TOOL NUMBER NGP SPC 258 3.750 3.8 FLO-PRO 8.80 49.0 7.7 7.2 .000 .000 .000 .000 55.0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 First Last Name Min Max Mean Nsam DEPT 10874.5 11073.5 10974 399 GR 17.22 152.08 37.5947 399 ROP 17.42 208 42.5824 343 Reading Reading 10874.5 11073.5 10874.5 11073.5 10902.5 11073.5 First Reading For Entire File .......... 10874.5 Last Reading For Entire File ........... 11073.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11074.0 11420.0 ROP 11074.0 11420.0 $ LOG HEADER DATA DATE LOGGED: 11-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 11420.0 11074.0 11420.0 MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPEP~ATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MITD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 70.2 94.4 TOOL NUMBER NGP SPC 219 3.750 3.8 FLO-PRO 9.10 55.0 8.0 5.4 .000 .000 .000 .000 53.9 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 API 4 1 68 4 2 ROP MWD 7 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading Last Reading DEPT 11074 11420 11247 GR 32.94 206.37 72.7797 ROP 11.72 353.95 72.9779 693 11074 11420 693 11074 11420 693 11074 11420 First Reading For Entire File .......... 11074 Last Reading For Entire File ........... 11420 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NI3MBER: 5 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11420.5 11491.5 ROP 11420.5 11517.0 $ LOG HEADER DATA DATE LOGGED: 13-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 90.7 MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 11517.0 11420.0 11517.0 MAXIMUM ANGLE: 92.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER NGP SPC 176 3.750 3.8 FLO-PRO 9.50 49.0 9.5 5.0 .000 .000 .000 .000 29.5 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 9 API 4 1 68 4 2 ROP MWD 9 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11420.5 11517 11468.8 194 11420.5 Last Reading 11517 GR 34.83 379.52 91.1448 143 ROP 1.86 412.64 71.6964 194 11420.5 11491.5 11420.5 11517 First Reading For Entire File .......... 11420.5 Last Reading For Entire File ........... 11517 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE N-UMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 11 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11490.0 11526.5 ROP 11515.0 11547.0 $ LOG HEADER DATA DATE LOGGED: 14-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 89.8 MAXIMUM ANGLE: 89.8 MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 11548.0 11517.0 11548.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATUR3~L GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined At, sent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NIIMBER NGP SPC 239 3.750 3.8 FLO-PRO 9.50 53.0 9.0 5.6 .000 .000 .000 .000 22.3 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 11 API 4 1 68 4 2 ROP MWD 11 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11490 11547 11518.5 115 11490 GR 80.32 137.52 91.0385 74 11490 Last Reading 11547 11526.5 ROP 40.9 75.8 73.5806 65 11515 11547 First Reading For Entire File .......... 11490 Last Reading For Entire File ........... 11547 File Trailer Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF File Header Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 12 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11526.0 11634.0 ROP 11549.5 11661.0 $ LOG HEADER DATA DATE LOGGED: 15-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: D©WNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 92.1 MAXIMUM ANGLE: 93.1 MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 11661.0 11548.0 11661.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATUR3~L GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER NGP SPC 264 3.750 3.8 FLO-PRO 9.50 53.0 9.0 5.6 .000 .000 .000 .000 12 .2 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 12 API 4 1 68 4 2 ROP MWD 12 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11526 11661 11593.5 271 11526 GR 68.34 220.33 114.816 217 11526 ROP 17.87 76.99 37.1568 224 11549.5 Last Reading 11661 11634 11661 First Reading For Entire File .......... 11526 Last Reading For Entire File ........... 11661 File Trailer Service name ............. STSLIB.007 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.008 Physical EOF File Header Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.007 Comment Record FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 13 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11633.0 12072.5 ROP 11660 . 0 12100 . 0 $ LOG HEADER DATA DATE LOGGED: 16-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 87.5 MAXIMUM ANGLE: 94.8 TOOL STRING (TOP TO BOTTOM) MSC 1.32 / ~SC 5.07 SPC 5.74 PCD 3.01e MEMORY 12100.0 11661.0 12100.0 VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE ~ CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 TOOL NUMBER NGP SPC 221 3.750 3.8 FLO-PRO 9.50 53.0 9.0 4.9 .000 .000 .000 .000 16.1 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 13 API 4 1 68 4 2 ROP MWD 13 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11633 12100 11866.5 935 11633 GR 46.18 323.21 98.3928 880 11633 ROP 22.85 268.76 56.7827 881 11660 Last Reading 12100 12072.5 12100 First Reading For Entire File .......... 11633 Last Reading For Entire File ........... 12100 File Trailer Service name ............. STSLIB.008 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.009 Physical EOF File Header Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.008 Comment Record FILE HEADER FILE NUMBER: 9 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 14 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12082.0 12734.0 ROP 12108.0 12760.5 $ LOG HEADER DATA DATE LOGGED: 18-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 87.0 MAXIMUM ANGLE: 94.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 12761.0 12100.0 12761.0 NGP $ NATURAL GAMMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 NGP SPC 221 3.750 3.8 FLO-PRO 9.50 56.0 9.0 5.5 .000 .000 .000 .000 16.1 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 14 API 4 1 68 4 2 ROP MWD 14 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 12082 12760.5 12421.2 1358 12082 GR 41.15 232.59 81.4595 1305 12082 ROP 15.45 576 74.0343 1306 12108 Last Reading 12760.5 12734 12760.5 First Reading For Entire File .......... 12082 Last Reading For Entire File ........... 12760.5 File Trailer Service name ............. STSLIB.009 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.010 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/04/01 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 99/04/01 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Scientific Technical Technical Services Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Drillin9 Services LIS Scan Utility Tue Mar 30 15:41:09 1999 Reel Header Service name ............. LISTPE Date ..................... 99/03/30 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writin9 Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/03/30 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writin9 Library. Scientific Technical Services Physical EOF Comment Record TA~E HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: 7-33A PB1 500292180970 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 30-MAR-99 MWD RUN 1 MWD RUN 2 MWD RUN 3 A/K-MW- 80395 A/K-MW- 80395 A/f-MW- 80395 D. LONG D. LONG D. LONG B. MIZE B. MIZE B. MIZE RECEIVED /',PR 0 6 1999 Aiaska 0{1 & Gas Cons, Commission Anohora JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: ,~ RANGE: FNL: FSL: MWD RUN 5 AK-MW- 80395 D. LONG A. KIRK MWD RUN 6 AK-MW- 80395 D. LONG M. JOHNSON 34 liN 14E 1068 FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 522 60.00 .00 .00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 7.000 10750.0 2ND STRING 5.500 10141.0 3RD STRING 4.500 10259.0 PRODUCTION STRING 4.000 12540.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1,2,3,5, AND 6 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP) . 3. MWD RUN 4 DRILLED NO FOOTAGE AND IS NOT PRESENTED. 4. MWD DATA HAS BEEN DEPTH SHIFTED/CORRECTED TO (C GR CNT S GAPI REAL) WL-GR LOGGED AFTER COMPLETION OF 7-33A. THIS WL-GR WAS PROVIDED BY DEDE SCHWARTZ OF ARCO ALASKA, INC. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12540'MD, 8868'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10755.5 12510.0 ROP 10773.5 12537.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH 10755. 10770. 10772. 10773. 10774. 10784. 10786. 10795. 10796. 10797 10800 10802 10804 10806 10809 10822 10824 10829 10830 10833 10835 10838 10839 10843 10846 10848 10850. 10870. 10873. 10875. 10877. 10881. 10884. 10885. 10895. 10918. 10922. 10926. 10927. 10929. 10931. 10933. 10935. 10937 10939 10941 10946 10947 10950 10952 10975 10977 10997. 10999. 11000. 11002. 5 5 5 5 0 5 0 0 0 0 0 5 0 5 5 0 5 0 5 0 5 0 0 0 5 0 0 5 5 0 5 0 0 5 0 0 5 0 5 5 5 5 5 5 5 5 0 5 0 5 5 0 5 0 5 0 GR 10757.5 10772.5 10774.0 10775.0 10775.5 10786.0 10787.5 10798.0 10800.0 10800.5 10802.0 10805.5 10807.0 10809.5 10812.5 10823.5 10827 5 10830 0 10832 0 10834 5 10838 0 10840 0 10841.0 10844.5 10848.5 10850.0 10852.5 10872.0 10875.0 10875 5 10878 0 10881 5 10885 0 10886 0 10895 5 10919 0 10923.5 10927.5 10928.5 10931.5 10932.5 10934.5 10936 0 10938 5 10940 5 10943 5 10947 0 10949 0 10951.5 10954 0 10977 0 10978 5 10998 5 11001 0 11002 5 11004 0 11004 11006 11007 11008 11012 11018 11020 11028 11031 11063 11067 11070 12537 $ .5 0 0 5 0 0 0 0 5 5 5 0 0 MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD $ REMARKS: 11006.5 11008.0 11009.0 11010.5 11013.0 11020.0 11022.0 11029.0 11032.5 11066.0 11068.0 11072.5 12539.5 BIT RUN NO MERGE TOP MERGE BASE 1 10775.0 10901.0 2 10901.0 11422.0 3 11422.0 11756.0 5 11756.0 12000.0 6 12000.0 12540.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD API 4 1 68 4 2 ROP MWD FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10755.5 12537 11646.2 3564 10755.5 GR 16.72 208.26 79.0333 3510 10755.5 ROP 13.17 1961.04 80.3623 3528 10773.5 Last Reading 12537 12510 12537 First Reading ~or Entire File .......... 10755.5 Last Reading For Entire File ........... 12537 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 R3IW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10757.5 10874.5 ROP 10775.0 10901.0 $ LOG HEADER DATA DATE LOGGED: 29-SEP-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 33.3 MAXIMUM ANGLE: 38.4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 10901.0 10775.0 10901.0 TOOL NUMBER NGP SPC 258 3.750 DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 3.8 FLO-PRO 8.70 64.0 8.5 5.8 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 1 API 4 1 68 4 2 ROP MWD 1 FT/H 4 1 68 8 3 16.1 First Name Min Max Mean Nsam Reading DEPT 10757.5 10901 10829.2 288 10757.5 GR 16.72 163.92 38.8465 235 10757.5 ROP 13.13 1683.47 142.705 253 10775 Last Reading 10901 10874.5 10901 First Reading For Entire File .......... 10757.5 Last Reading FQr Entire File ........... 10901 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10874.5 11394.5 ROP 10902.5 11421.5 $ LOG HEADER DATA DATE LOGGED: 01-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 41.3 MAXIMUM ANGLE: 89.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 11422.0 10901.0 11422.0 TOOL NUMBER NGP SPC 258 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPER3~TURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 FLO-PRO 8.80 49.0 7.7 7.2 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 ROP MWD 2 FT/H 4 1 68 8 3 55.0 First Name Min Max Mean Nsam Reading DEPT 10874.5 11421.5 11148 1095 10874.5 GR 17.22 206.74 57.5821 1041 10874.5 ROP 17.42 393.4 58.276 1039 10902.5 Last Reading 11421.5 11394.5 11421.5 First Reading For Entire File .......... 10874.5 Last Reading For Entire File ........... 11421.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NIIMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11395.5 11728.5 ROP 11410.5 11755.5 $ LOG HEADER DATA DATE LOGGED: 02-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 85.3 MAXIMUM ANGLE: 92.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 11756.0 11422.0 11756.0 TOOL NUMBER NGP SPC 219 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 FLO-PRO 8.60 41.0 8.5 8.4 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 3 API 4 1 68 4 2 ROP MWD 3 FT/H 4 1 68 8 3 14.8 First Name Min Max Mean Nsam Reading DEPT 11395.5 11755.5 11575.5 721 11395.5 GR 51.12 175.98 86.6224 667 11395.5 ROP 14.92 1961.04 147.924 691 11410.5 Last Reading 11755.5 11728.5 11755.5 First Reading For Entire File .......... 11395.5 Last Reading For Entire File ........... 11755.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 P_AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11730.5 11972.5 ROP 11758.5 11999.5 $ LOG HEADER DATA DATE LOGGED: 07-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 88.5 MAXIMUM ANGLE: 94.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE ~ CASING DATA OPEN HOL~ BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 12000.0 11756.0 12000.0 TOOL NUMBER NGP SPC 219 3.750 3.8 MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 FLO - PRO 8.60 51.0 8.0 12000 9.0 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 5 API 4 1 68 4 2 ROP MWD 5 FT/H 4 1 68 8 3 58.6 First Name Min Max Mean Nsam Reading DEPT 11730.5 11999.5 11865 539 11730.5 GR 71.68 208.26 110.461 485 11730.5 ROP 13.17 817.33 61.3248 483 11758.5 Last Reading 11999.5 11972.5 11999.5 First Reading For Entire File .......... 11730.5 Last Reading For Entire File ........... 11999.5 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF File Header Service name ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11973.0 12512.5 ROP 12001.0 12539.5 $ LOG HEADER DATA DATE LOGGED: 08-OCT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 91.7 MAXIMUM ANGLE: 95.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 12540.0 12000.0 12540.0 TOOL NUMBER NGP SPC 258 3.750 3.8 FLO-PRO MUD DENSITY (LB/G) : MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 8.80 53.0 8.0 27000 6.5 .000 .000 .000 .000 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 6 API 4 1 68 4 2 ROP MWD 6 FT/H 4 1 68 8 3 63.3 First Name Min Max Mean Nsam Reading DEPT 11973 12539.5 12256.2 1134 11973 GR 42.82 154.86 89.3077 1080 11973 ROP 16.02 602.41 80.0901 1078 12001 Last Reading 12539.5 12512.5 12539.5 First Reading For Entire File .......... 11973 Last Reading For Entire File ........... 12539.5 File Trailer Service nam~ ............. STSLIB.006 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/30 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.007 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/03/30 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 99/03/30 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Scientific Technical Technical Services Services Physical EOF Physical EOF End Of LIS File Sperry-Sun Drilling Services LIS Scan Utility Thu Apr 01 08:56:47 1999 Reel Header Service name ............. LISTPE Date ..................... 99/04/01 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/04/01 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: 7-33A PB2 500292180971 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 01-APR-99 MWD RUN 1 MWD RUN 2 MWD RUN 7 AK-MW-80395 AK-MW-80395 AK-MW-80395 D. LONG D. LONG D. LONG B. MIZE B. MIZE M. JOHNSON RECEIVED APR 0 6 1999 Alaska OB & Gas Cons. Commission A~d~ora~ JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: MWD RUN 8 AK-MW-80395 D. LONG M. JOHNSON 34 lin 14E 1068 FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 522 60.00 .00 .00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 7.000 10750.0 2ND STRING 5.500 10141.0 3RD STRING 4.500 10259.0 PRODUCTION STRING 4.000 11838.0 REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUNS 1,2,7 AAID 8 ARE DIRECTIONAL WITH SCINTILLATION TYPE GAMMA P~AY (NGP) . 3. MWD RUNS 3 THROUGH 6 CONTAIN NO VALID DATA AND ARE NOT PRESENTED. 4. MWD DATA HAS BEEN DEPTH SHIFTED/CORRECTED USING (C GR CNT S GAPI REAL) WL-GR PROVIDED BY DEDE SCWARTZ OF ARCO ALASKA, INC. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11838'MD, 8911'SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 10755.5 11812.0 ROP 10773.5 11838.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH GR EQUIVALENT UNSHIFTED DEPTH 10755 10770 10772 10773 10774 10784 10786 10795 10796 10797 10800 10802 10804 10806 10809 10822 10824 10829 10830 10833 10835 10838 10839 10843 10846 10848 10850 10870 10873 10875 10877 10881 10884 10885 10895 10918 10922 10926 10927 10929 10931 10933 10935 10937 10939 10941 10946 10947 10950 10952 10975 10977 10997 10999 11000 11002 11004 10757 10772 10774 10775 10775 10786 10787 10798 10800 108O0 10802 10805 10807 10809 10812 10823 10827 10830 10832 10834 10838 10840 10841 10844 10848 10850 10852 10872 10875 10875 10878 10881 10885 10886 10895 10919 10923 10927 10928 10931 10932 10934 10936 10938 10940 10943 10947 10949 10951 10954 10977 10978 10998 11001 11002 11004 11006 11006 11007 11008 11012 11018 11020 11028 11031 11063 11067 11070 11081 11082 11086 11087 11095 11108 11111 11123 11126 11127 11130 11132 11133 11140 11142 11144 11153 11156 11159 11162 11165 11172 11175 11179 11181 11183 11185 11186 11187 11189 11199 11207 11210 11211 11216 11218 11220 11222 11327 11328 11354 11357 11371 11372 11838 $ 110 110 110 110 110 110 110 110 110 110 110 110 110 11086 11088 11095 11108 11111 11123 11126 11127 11129 11132 11134 11139 11141 11143 11153 11156 11158 11162 11164 11171 11175 11180 11182 11183 11184 11186 11188 11189 11200 11206 11209 11211 11216 11219 11222 11223 11327 11328 11353 11355 11370 11371 11838 08 0 O9 0 10 5 13 0 20 0 22 0 29 0 32 5 66 0 68 0 72 5 79 5 82 5 5 0 0 5 5 5 5 5 5 5 0 0 5 5 0 0 5 0 5 5 0 5 0 0 0 0 0 5 5 5 5 0 0 0 5 5 5 5 5 5 5 5 0 MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 1 10775.0 10901.0 2 10901.0 11074.0 7 11074.0 11515.0 8 11515.0 11838.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10755.5 11838.5 11297 2167 10755.5 ROP 11.72 1683.47 79.5782 2131 10773.5 GR 16.72 1097.9 74.5705 2114 10755.5 Last Reading 11838.5 11838.5 11812 First Reading For Entire File .......... 10755.5 Last Reading For Entire File ........... 11838.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE N-U-MBER: 2 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10757.5 10874.5 ROP 10775.0 10901.0 $ LOG HEADER DATA DATE LOGGED: 29-SEP-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 33.3 MAXIMUM ANGLE: 38.4 MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 10901.0 10775.0 10901.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP SPC 258 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.70 64.0 8.5 5.8 .000 .000 .000 .000 16.1 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 1 FT/H 4 1 68 4 2 GR MWD 1 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10757.5 10901 10829.2 288 10757.5 ROP 13.13 1683.47 142.705 253 10775 GR 16.72 163.92 38.8465 235 10757.5 Last Reading 10901 10901 10874.5 First Reading For Entire File .......... 10757.5 Last Reading For Entire File ........... 10901 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NLTMBER: 3 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 10874.5 11073.5 ROP 10902.5 11073.5 $ LOG HEADER DATA DATE LOGGED: 01-OCT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 41.3 MAXIMUM ANGLE: 89.8 MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 11074.0 10901.0 11074.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP SPC 258 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.80 49.0 7.7 7.2 .000 .000 .000 .000 55.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEFT FT 4 1 68 0 1 ROP MWD 2 FT/H 4 1 68 4 2 GR MWD 2 API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEFT 10874.5 11073.5 10974 399 10874.5 ROP 17.42 208 42.5824 343 10902.5 GR 17.22 152.08 37.5947 399 10874.5 Last Reading 11073.5 11073.5 11073.5 First Reading For Entire File .......... 10874.5 Last Reading For Entire File ........... 11073.5 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 11074.0 11488.5 ROP 11074.0 11515.5 $ LOG HEADER DATA DATE LOGGED: 11-0CT-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 70.2 M_AXI~ ANGLE: 94.4 MSC 1.32 / ISC 5.07 SPC 5.74. PCD 3.01e MEMORY 11515.0 11074.0 11515.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP SPC 219 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FL0-PRO 9.10 55.0 8.0 5.4 .000 .000 .000 .000 53.9 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 7 API 4 1 68 4 2 ROP MWD 7 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11074 11515.5 11294.8 884 11074 GR 32.94 206.37 71.4609 830 11074 ROP 11.72 353.95 72.1019 884 11074 Last Reading 11515.5 11488.5 11515.5 First Reading For Entire File .......... 11074 Last Reading For Entire File ........... 11515.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF File Header Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11489.0 ROP 11516.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11811.5 11838.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPER3~TURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: 12-0CT-98 MSC 1.32 / ISC 5.07 SPC 5.74 PCD 3.01e MEMORY 11838.0 11515.0 11838.0 85.7 89.1 TOOL NUMBER NGP SPC 176 3.750 3.8 FLO-PRO 9.10 530.0 9.0 6.2 .000 .000 .000 .000 26.7 HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 8 API 4 1 68 4 2 ROP MWD 8 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 11489 11838 11663.5 699 11489 GR 67.64 1097.9 115.002 646 11489 ROP 25.17 1148.1 85.1901 645 11516 Last Reading 11838 11811.5 11838 First Reading For Entire File .......... 11489 Last Reading For Entire File ........... 11838 File Trailer Service name ............. STSLIB.005 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/04/01 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.006 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/04/01 Origin ................... STS Tape Name ................ UNK/~OWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 99/04/01 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File