Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
198-194
MD 13493 TVD 08754 Corn ....tion Date: 11/1/98 Completed Status: I ~- 'L Current: Microfilm Roll / Ro~. / _ Spud 10/12/98 Llevation: KB 0053 T Name Interval Run Sent Received C 9629 1 SCHLUM MCNL CH 5/31/00 6/13/00 D 9116 1 SPERRY GR OH 3/25/99 3/26/99 L MCNL FINAL 13521-8500 1/30/00 CH 2 6/7/00 6/13/00 L NGP-MD FINAL 13163-13492 OH 3/25/99 3/26/99 L NGP-TVD FINAL 8621-8700 OH 3/25/99 3/26/99 R SRVY RPT SPERRY 13020.06-13464.4 OH 1/8/99 1/11/99 _ T/C/D PLUGGi)]'~ & LOCATION CLE.~2~_~CE REPORT Sta~a cf Alaska ~ we~" =:~ ~ and-ccmmenu on pluqcj~-~g, well head Well hear =am o~-~: ,t',t 0 .- Code STATE OF ALASKA ALAST~,' OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil ~1 Gas D Suspended r-] Abandoned r~l Service D 2. Name of Operator 7. Permit Number BP Exploration (Alaska), Inc. 198-194 3. Address 8. APl Number P. O. Box 196612 Anchorage, AK 99519-6612 50-029-22321-02 4. 'Location of well at sudace 9. Unit or Lease Name 889' FNL, 234' FEL, Sec. 24, T11 N, R14E, UM (asp's 691523, 5960971) !'~ Prudhoe Bay Uni~ At Top Producing Interval~ 10. Well Number 4957' FNL, 3512' FEL, Sec. 13, T11 N, R14E, UM (asp's 688217, 5962102) 18-27B At Total Depth 11. Field and Pool 3430' FNL, 1030' FEL, Sec. 14, T11 N, R14E, UM (asp's 685380, 5963556) Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 51 feetI ADL 28307 Prudhoe Bay Oil Pool 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. 115. Water Depth, if offshore 16. No. of Completions October 12, 1998 October 29, 1998 October 5, 2000 (P&A'd) I N/A feet MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 13493' MD /8752' TVD 12300' MD /8683' TVD YES r~ No r-!I 2223, feet MD 1900' (approx) 22. Type Electric or Other Logs Run MWD/GR, Mere GPJCCL/CNL 23. CASING, LINER AND CEMENTING RECORD SEll-lNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO-I-FOM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 20" 91.5# H-40 Surface 110 30" 2000# Coldset II 13-3/8" 68# K-55/L-80 Surface 3497 16" 2706 cuft Coldset III & 460 cuft Class G 9-5/8" 47# L-80 Surface 9069 12-1/2" 2217 cuft Class G 7" 26# NT-80-S 8829 9827 8-1/2" 398 cuft Class G 4-1/2" 12.6# L-80 8678 13139 6" 832 cuft Class G 2-7/8" 6.4# L-80 13120 13493 3-3/4" Uncemented slotted liner 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" 8684' 8692' 8629' 8664' * Plugged & Abandoned all open perforation intervals. 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED (See P&A Summary) 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) N/A Plugged & Abandoned Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO I N/A Test Period > Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) Press. 24-Hour Rate > 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. * This 10-407 is submitted as directed per the 10-403 form approved September 29, 2000 (Approval #3o~2~)[ E ! V E D NOV 2_ 9 2000 A,~,,t,o ni~ ~, r~s Cons. Commission Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE ORIGiNAl Anch~i~t in duplicate 29. NAME Top of Sag River Sand Top of Shublik Top of Sadlerochit GEOLOGIC MARKERS MEAS. DEPTH 8988' 9051' TRUE VERT. DEPTH 8208' 8247' 8304' Top of Zone lB 9146' 10022' 8653' 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity. GOR, and time of each phase. N/A 31. LIST OF A-FI-ACHMENTS Summary of 18-27B Pre Coil Tubing Sidetrack Plug & Abandonment Operations. 32. I hereby cedify that the following is true and correct to the best of my knowledge. Signed ~~..__ _ _ Title Coil Tubing Drilling En.qineer Lamar Gantt Date INSTRUCTIONS Prepared by Paul Rauf 564-5799. General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection,_Ga.s. ln. je,.ctjc;~n, Shut-in, Other-explain. R£C Wt::u Item 28: If no cores taken, indicate "none". NOV 2 9 Form 10-407 Alaska Oil & Gas Cons. Commission Anchorage ..... · 18-27B DESCRIPTION OF WORK COMPLETED PRE COILED TUBING SIDETRACK PLUG & ABANDOMENT SUMMARY Date Event Summary 9/25/2000: 10/03/2000: 10/04/2000: 10/05/2000: Dummied GLV's. MIRU Nabors Nordic 1. Accepted Rig. PT'd BOPE. Killed well. RIH & cleaned out to whipstock setting area. Reamed interval f/12300' - 12400' & POOH. RIH w/GR/CCL tools & ran tie-in Icg. P©OH w/tools. Set a Packer w/Bullnose Plug to Plug & Abandon the lower wellbore prior to ST operations as follows: RIH & set Baker TorqueMaster Packer @ 12314' MD w/ bullnose plug positioned @ 12320'. This abandons /isolates the open perforations located @: 12541'- 12858' MD (Zone lB) & the previously squeezed perforations located @: 12858'- 13070' MD (Zone lB) & the previously squeezed slotted liner located @: 13120'- 13493' MD (Zone lA) POOH w/packer setting tool. RIH & set whipstock tray @ 12300'. Confirmed tag of whipstock. Began milling window. Continued w/18-27C Sidetracking Operations. RECEIVED NOV 29 2000 Alaska 0il & (~as Cons. Oommissio~ Anchorage To: Blair Wondzell Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Ted Stagg CTD Engineer Date: Sept. 26, 2000 Re: Well 18-27c Well 18-27a is scheduled for a through tubing sidetrack with the Schl./Nordic coil drilling rig. The sidetrack, 18- 27c, will kick off from a window milled from a mechanical whipstock to be set in the Zone I interval of 18-27a. The 18-27c target is lower Zone I to the east of 18-27a. The following describes work planned to prep 18-27a for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack completion is attached for reference. 1. GLM's have been dummied off. The IA will be loaded and pressure tested to 2500 psi. 2. A dummy whipstock drift will be run on service coil. 3. Service coil will set a whipstock anchor-bridge plug at 12,350' to isolate from existing Zone 1 perfs and to provide a whipstock anchor. The anchor-plug will be tested to 2500 psi. 4. Service coil will run a memory inclinometer that will sting into the whipstock anchor to confirm orientation of the whipstock tray orienting lug. 5. The whipstock tray will be installed by the drilling coil rig. Service coil is scheduled to set the whipstock anchor-plug on Sept. 30 if Sundry approval is received by that time. Drilling coil will move onto the well on Monday Oct. 2 if technical approvals and the Permit to Drill are received. Ted Stagg CTD Drilling Engineer CC: Well File Petrotechnical Data Center STATE OF ALASKA ALASK/' ' AND GAS CONSERVATION COMP ',;ION A~"r~LICATION FOR SUNDRY APPROVA~ 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 893' SNL, 236' WEL, SEC. 24, T11N, R14E, UM At top of productive interval 4957' SNL, 3512' WEL, SEC 13, T11N, R14E, UM At effective depth 4003' SNL, 827' WEL, SEC 14, T11N, R14E, UM At total depth 3435' SNL, 1029' WEL, SEC 14, T11N, R14E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) KBE = 53.35 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 18-273 9. Permit Number 198-194 10. APl Number 50- 029-22321-02 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 13493 feet true vertical 8753 feet Effective depth: measured 12858 feet true vertical 8676 feet Casing Length Size Structural Conductor 110' 20" Su trace 3462' 13-3/8" Intermediate 9035' 9-5/8" Production Liner 981' 7" Liner 4461' 4-1/2" Liner 373' 2-7/8" Plugs (measured) Junk (measured) TOC tagged at 12858' (05/00) ORIGINAL Cemented MD 2000# Cold Set II 110' 2706 cu ft Cold Set III, 460 cu ft 'G' 3497' 2217 cu ft Class 'G' 9069' 398 cu ft Class 'G' 832 cuft Class 'G' Uncemented, Slotted Liner TVD 110' 3497' 8259' 8829' - 9827' 8110' - 8618' 8678' - 13139' 8011'- 8674' 13120' - 13493' 8674' - 8753' Perforation depth: measured Open Perforation: 12541'- 12858' ~ FCE!VED Sqzd Perf's & Slotted Liner Section: 12858'- 13070', 13125'- 13493' true vertical Open Perforation: 8678'- 8675' SEP 2 Sqzd Perf's & Slotted Liner Section: 8675' - 8673', 8674' - 8753' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 8684' Aiasi~,a Oit & Gas Co~Is, 0_o~r~qi$s[i Anch0ra~e Packers and SSSV (type and measured depth) 9-5/8" x 7" Liner Top packer at 8837'; 9-5/8" x 4-1/2" Baker 'S-3' Packer at 8629', 4-1/2" Camco 'BAL-O' SSV Nipple at 2223' 13. Attachments [] Description Summary of Proposal [] Detailed Operations Program [] BOP Sketch 14. Estimated date for commencing operation September 30, 2000 16. If proposal was verbally approved 15. Status of well classifications as: []Oil []Gas []Suspended Service Name of approver Date Approved Contact Engineer Name/Number: Ted Stagg, 564-4694 Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ / SignedTed Stagg '~,/--(~.,,,~f'.z¢,/'~"/~~..~.~¢ . Title CT Drilling Engineer Date y~.,2.?~¢~..~¢ -'1 ;onditions of Approval: Notify Commission so representative may witness Plug integrity ,,,,,/ BOP Test ¢,-," Location clearance Mechanical Integrity Test__ Subsequent form required 10- Approved by order of the Commission Form 10-403 Rev. 06/15/88 ORIGINAL SIGNED BY Approval No.~~ Commissioner Date Submit In Triplicate -1/2" Camco BAL-O SSSV Nipple @ 2223' 9-5/8" Baker S-3 Packer @ 8629' 4-1/2" TOL @ 8678' 7" TOL @ 8829' DS 18-27C Proposed Wellbore Sketch Sidetrack Completion TD @ 14491' 4-1/2", 12.6#, L-80 Production Tubing to 8684' TD of old 2-7/8"@ 13493 9-5/8": Shoe @ 9069' 2-7/8" 6.16# ST-L Liner Cemented & Perforated 2-7/8" Slotted Liner P&A'd WindOw in 7" Liner .,,.@ 9827' off ~/Vhipstock o Shoe ~ 10~27' Mill Window through 4-1/2" Liner @ 12350' off Whipstock 3-3/4" Open hole Anchor / Plug @ 12350' Window in 4-1/2" Liner @ 13130' 2-7/8" Liner Top @ 11800' Top of Cement @ 12858' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown_ Stimulate_ Plugging _ Perforate_ Pull tubing _ Alter casing _ Repair well _ Other_X 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB feet) Phillips Alaska, Inc. Development_X RKB 51 feet 3. Address Exploratow___ 7. Unit or Property name . P. O. Box 100360 Stratigraphic_ Anchorage, AK 99510-0360 Service__ Prudhoe Bay Unit 4. Location of well at surface 8. Well number 889' FNL, 234' FEL, Sec. 24, T11 N, R14E, UM (asp's 691523, 5960971) 18-27B At top of productive interval 9. Permit number / approval number 44956' FNL, 3513' FEL, Sec.13, T11N, R14E, UM (asp's 688216, 5962103) 198-194 At effective depth 10. APl number 50-029-22321-02 At total depth 11. Field / Pool 3430' FNL, 1030' FEL, Sec. 14, T11 N, R14E, UM (asp's 685380, 5963556) Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 13493 feet Plugs (measured) TOC tagged (5/13/2000) @ 12858' MD. true vertical 8752 feet Effective depth: measured 12858 feet Junk (measured) true vertical 8674 feet Casing Length Size Cemented Measured Depth True vertical Depth Conductor 110' 2'0" 2000# CS II 110' 110' Surface 3462' 13-3/8" 2706 ft3 cs III & 460 ft3 class G 3497' 3497' Production 9035' 9-5/8" 2217 cubic ft Class G 9069' 8258' Liner 981' 7" 398 cubic ft C~ass G 9827' 8617' Liner 4461' 4-1/2" 832 cubic ft Class G 13139' 8673' Slotted Liner 373' 2-7/8" uncemented 13493' 8752' Perforation depth: measured 12541'- 12858'. ./~, . ~-~¢ ~¢-, true vertical 8679' - 8674'. :~ ,,, O 9 Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 Tbg @ 8684' MD..~2~f~,~ ........ (~.,, & (~{S C0i'!S. 'bU[l;~i]iS.-'.4~{~() ......... Packers & SSSV (type & measured depth) 9-5/8' x 4-1/2' BAKER 3-S PACKER @ 8629' MD; 9-5/8' X 7' HMO LINER HANGER/PACKER W/TIE BACK SLEEVE @ 8664' MD. 9-5/8" X 7" ZXP Liner Packer @ 8692' MD; 4-1/2" CAMCO BAL-O SSV @ 2223' MD. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation (shut in) - - Subsequent to operation 242 738 0 492 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run ~ Daily Report of Well Operations __X Oil __X Gas ~ Suspended ~ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. . Signed ~' r Title PAl Wellwork Design & Optimization Supervisor Date ~. -- ,~ ~.- Erin Oba ~ Prepared by Paul Rauf 263-4990 Form 10-404 Rev 06/15/88 · SUBMIT IN DUPLICATE DESCRIPTION OF WORK COMPLETED RETAINER CEMENT SQUEEZE FOR GSO Date Event Summary 4/04/2000: 4/05/2000 - 4/06/2000: 4/09/2000: 5/12/2000: 5/13/2000: 5/23/2000: RIH & drifted to 9890' MD (HAW). Dummied GLV's. Dummied SSSV. Dummied GLV's. Loaded IA w/Crude. Tested MITIA to 3000 psi - good test. A Retainer Cement Squeeze for GSO was performed as follows: MIRU CTU. PT'd equip to 3500 psi. Loaded & killed well. RIH & set EZSV cementing packer in 4-1/2" liner @ 12889' MD to isolate the following perfs: 12541'- 12889' MD (Zone 1 B) RIH w/stinger assembly but unable to penetrate the top of liner @ 8670'. POOH. RIH & stung into EZSV. Verified circulation. Pumped 42 bbls of 15.6 ppg Latex Acid Resistive Cement to squeeze off the slotted liner & the channel to the 18-27A old wellbore. Squeezed 15 bbls of Cement behind pipe at a max squeeze press of 3000 psi. Contaminated Cement w/Biozan & jetted contaminated Cement f/wellbore. Identified pinhole leak in CT. POOH. RD CTU#5. MIRU CTU#3. RIH & cleaned out to 12858' MD. Swapped to Crude. POOH. Performed injectivity test: 1200 psi @ 0.5 bpm & 1700 psi @ 1.0 bpm. RDMOL. Ran LGLV's & SSSV. Placed well BOL & obtained representative welltest data. Page I 5/31/00 Schiumberger NO. 199 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A'FI'N: Sherrie Company: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay (Cased Hole) Well Job # Log Description Date BL Sepia CD D.S. 15-26,~ ~(~ ~ 20130 MGR/CCL PERF DEPTH CONTROL 000313 1 1 1 D.S. 15-31 ~,~to~ ~) 20111 MGR/CCL PERF DEPTH CONTROL 000308 I 1 1 D.S. 3-25A 1~ C{~l (~ 20220 RST 000514 1 1 1 D.S. 15-01A.lt~c[(~l ~ 20166 MGR/CCL PERF DEPTH CONTROL 000319 1 1 1 D.S. 15-02A.,1Lc[b .{'~ 20129 MGR/CCL PERF DEPTH CONTROL 000312 .., 1 I 1 D.S. 18-27B~'~f. :~ 20071 MCNL 000130 I I 1 ., - ' R CEIV D S,~NEO: O~TE: JUN 1,~ 2000 e'-~p Naska Oil & Ga= t;mr~. ~,~,,missi0n Please sign and return on y of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thanka,~.ra§e 0 I:t I I_1_11~ G WELL LOG TRANSMITTAL To: State of Alaska March 25, 1999 Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3 001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - D.S. 18-27B, AK-MW-80423 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted Disc with verification listing. API#: 50-029-22321-02. '..,,! & ,,;as ~ns. Csmmission 5631 Silverado Way, Suite G , Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company sp i i J-sum C] !::! I I--I.. I I~1 [~ WEIJ~ LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs · 18-27B, March 25, 1999 AK-MW-80423 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of.' Ali Turker, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 D.S. 18-27B: 2" x 5" MD Gamma Ray Logs: 50-029-22321-02 2"x 5" TVD Gamma Ray Logs: 50-029-22321-02 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company STATE OF ALASKA ALAS,-~ OIL AND GAS CONSERVATION COMt,.~'~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of well Classification of Service Well Oil ~] Gas ['--] Suspended [~] Abandoned r~ Service 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 98-194 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510-0360 50-029-22321-02 4. Location of well at surface ~. 9. Unit or Lease Name 893' SNL, 236' WEE, SEC. 24, T11N, R14E, UM ~'~~- . . PRUDHOE BAY UNIT .... '-' :~-~ ! :.ii;?~ PRUDHOE BAY FIELD 3432' FNL, 1029' FEL, SEC 14, T11N, R14E, UM .............. ? - 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. RKB 53 feetI ADL 028307 PRUDHOE BAY OIL POOL 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. Or Aband. I15. Water Depth, if offshore 16. No. of Completions October 12, 1998 October 29, 1998 November 1, 1998 I N/A feet MSL 1 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 13493' MD /8754' TVD 13493' MD /8754' 'I'VD YES r~] No [-]I 2223' MD. feet MD 1900' (approx) 22. Type Electdc or Other Logs Run GR/CCL, MWD 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD I CASING SIZE w'r, PER Fr. GRADE TOP BO'FI'OM HOLE SIZE CEMENTING RECORDI AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 200o # cs II 13-3/8" 68# L-80 35' 3497' 16" 2706 cubic ft CS III & 460 cubic ft Class G 9-5/8" 47# L-80 34' 9069' 12-1/4" 2217 cubic ft Class G 7" 26# NT80-S 8846' 9827' 8-1/2" 398 cubic ft Class G 4~1/2" 12.6# L-80 8678' 13139' 6" 832 cubic ft Class G 2~7/8" 6.4# L-80 13120' 13493' 3-3/4' no cement, slotted liner 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) :PACKER SET (MD) 4-1/2" 8684' 8629' 12541' - 13070' MD; 8679' - 8674' 'I'VD; @4 SPF 13120' - 13493' MD; 8675' - 8754' 'I-VD; (s/otted liner) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) November 3, 1998 Flowing Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO 11/6/1998 4.4 Test Pedod > 4738 16473 0I 3477 Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - APl (corr) Press. 1374 psi 24-Hour Rate > 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and pressence of oil, gas or water. Submit core chips. * This 10-407 is submitted as directed per the 10-401 form approved October 8, 1998 (Pe~'t~E)~ VED JAN 11 1999 0 ~/GIN/~L Alaska 0il & Gas C0.s. C0rnml~10r, Anchorage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate Ir 29. 30. NAME Sag River Top Shublik Top Top of Sadlerochit Top of Zone lB GEOLOGIC MARKERS,,_,, MEAS. DEPTH 8988' 9051' 9146' 10022' TRUE VERT. DEPTH 8208' 8247' 8304' 8653' '. .... , FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. LIST OF ATTACHMENTS Summary of 18-27B CT Sidetrack Drilling Operations + Survey. 32. I hereby certily that the following is true and correct to the best of my knowledge. Signed .... Title AAI Coil Tubin,q Drillin,q Supervisor Bruce E. Smith, P.E. Date INSTRUCTIONS Prepared by Paul Rau! 263-4990. General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 18-27 B ~'~'rDESCRIPTION OF WORK COMPLETED~-=~ COILED TUBING SIDETRACK DRILLING OPERATIONS SUMMARY Date Event Summary 10/08/1998: 10/09/1998: 10/10/1998: 10/11/1998: 10/12/1998: 10/13/1998: 10/26/1998: 10/27/1998: 10/28/1998: 10/29/1998: 10/30/1998: 10/31/1998: 11/01/1998: MIRU CTU. PT equip to 4000 psi. RIH & tagged PBTD @ 13133' MD. UR'd cement to 13178' MD. POOH w/UR. RIH w/CT & performed FCO to 13178' MD. POOH w/CT. PT'd cement to 2200 psi, lost 2000 psi in 30 minutes. RIH w/Test Packer to 12900' MD. PT'd above Packer to 2200 psi - passed. Retrieved all Packer elements & POOH. RIH & tagged PBTD 13175' MD. Ran GR/CCL f/PBTD to 12000'. RIH & set Whipstock Receptical Packer @ 13156'. POOH. RIH w/Whipstock & attempted to set. Unable to latch Whipstock so POOH. Asphaltines on tools. RIH & pumped 8 bbls of Diesel/Xylene. Set Whipstock & POOH. RIH w/BHA & tagged Top of Whipstock @ 13136'. Began milling window through the 4-1/2" casing. POOH. RIH w/BHA & milled window f/13136' to 13144'. Drilled OH to 13161'. Backreamed through window & POOH. PT equip to 4000 psi. RIH & pumped Hot Oil. FCO'd Liner & tubing & POOH. RIH w/BHA & dressed window area. POOH. FP'd well. RDMOL. MIRU CTU. cont. MIRU CTU. Complete RU. Tested BOPE. Well dead. RIH w/BHA. Drilled f/13161' to 13240' & swapped to FIo Pro. Drilled ahead toTD @13493'. POOH. RIH w/2-7/8" slotted liner. Landed 373' liner @ 13493'. Unstung & displaced liner to 2% KCL Water. POOH. Top of Liner @ 13120' MD. RIH w/Peri guns to PBTD & shot 529' of Perforations in the 4-1/2" liner f/: 12541' - 13070' MD (zone lB) Ref Log: Neutron/Density 3/31/1998 Used 3-3/8" HSD carriers & shot all Peris @ 4 SPF, 60° phasing, & random orientation. POOH w/guns. FP well. ASF. RDMOL Placed well on initial production & obtained a valid well test. Sidetrack Summary Page I Prudhoe Bay Unit Alaska State Plane Zone 4 PBU EOA DS ~8 ~8-27A - ~ 8-27B Job No. AKMWS0423, Surveyed: 29 October, 1998 S UR VEY REPORT 20 November, 1998 Your Ref: API-500292232102 KBE- 53.35 MWD Survey Instrument Surface Coordinates: 5960969.34 N, 691522.34 E (70° 17' 52.5352' N, 148° 26' 56.0303' W) survey Ref: svy3960 Sperry-Sun Drilling Services Survey Report for 18-27A - 18-27B Your Ref: API-500292232102 Job No. AKMWS0423, Surveyed: 29 October, 1998 Prudhoe Bay Unit Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) (ft) (ft) (ft) 13020.06 90.770 329.570 8620.11 8673.46 2302.56 N 5965.12 W 5963119.13 N 685500.47 E 13052.00 90.030 331.900 8619.89 8673.24 2330.42 N 5980.74 W 5963146.58 N 685484.16 E 13084.00 88.980 334.500 8620.17 8673.52 2358.98 N 5995.16 W 5963174.76 N' 685469.01 E 13116.00 88.860 335.100 8620.77 8674.12 2387.93 N 6008.78 W 5963203.36 N 685454.65 E 13136.00 89.210 335.800 8621.11 8674.46 2406.11 N 6017.09 W 5963221.33 N 685445.88 E 13161.59 91.140 342.700 8621.03 8674.38 2430.03 N 6026.15 W 5963245.00 N 685436.21 E 13201.29 91.140 349.500 8620.24 8673.59 2468.54 N 6035.68 W 5963283.25 N 685425.71 E 13239.35 89.780 356.710 8619.93 8673.28 2506.29 N 6040.25 W 5963320.88 N 685420.18 E 13278.15 82.700 356.360 8622.48 8675.83 2544.91 N 6042.59 W 5963359.43 N 685416.86 E 13310.91 79.010 357.240 8627.68 8681.03 2577.20 N 6044.39 W 5963391.66 N 685414.23 E 13337.63 73.830 357.590 8633.95 8687.30 2603.14 N 6045.57 W 5963417.56 N 685412.40 E 13371.77 68.910 354.070 8644.86 8698.21 2635.39 N 6047.90 W 5963449.74 N 685409.24 E 13404.52 65.300 350.380 8657.60 8710.95 2665.27 N 6051.97 W 5963479.51 N 685404.41 E 13444.13 62.670 344.050 8674.99 8728.34 2699.96 N 6059.82 W 5963513.99 N 685395.68 E 13464.44 58.310 341.110 8684.99 8738.34 2716.82 N 6065.10 W 5963530.71 N 685389.97 E 13493.00 58.310 341.100 8700.00 8753.35 2739.82 N 6072.97 W 5963553.50 N 685381.52 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 27.998° (27-Oct-98) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 343.490° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 13493.00ft., The Bottom Hole Displacement is 6662.40ft., in the Direction of 294.282° (True). Alaska State Plane Zone 4 PBU EOADS 18 Dogleg Rate (o/,tooft) Vertical Section (ft) Comment 7.654 8.762 1.912 3.913 27.997 17.125 19.277 18.270 11.572 19.428 17.409 15.139 15.819 24.887 0.030 3902.81 3933.96 3965.44 3997.06 4016.86 4042.37 4082.00 4119.49 4157.19 4188.66 4213.86 4245.44 4275.25 4310.74 4328.41 4352.69 Tie-on Survey Projected Survey Continued... 20 November, 1998 - 11:20 - 2 - DrillQuest Prudhoe Bay Unit Sperry-Sun Drilling Services Survey Report for 18-27A - 18-27B Your Ref: API-500292232102 Job No. AKMWS0423, Surveyed: 29 October, 1998 Alaska State Plane Zone 4 PBU EOADS 18 Comments Measured Depth (ft) 13020.06 13493.00 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 8673.46 2302.56 N 5965.12 W 8753.35 2739.82 N 6072.97 W Comment Tie-on Survey Projected Survey 20 November, 1998 - 11:20 - 3 - DrillQuest TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 October 8, 1998 Erin Oba Engineering Supervisor ARCO Alaska, Inc. P O Box 100360 Anchorage, AK 99510-0360 Re: Prudhoe Bay Unit !8-27B ARCO Alaska, Inc. Permit No: 98-194 Sur Loc: 893'SNL, 236~vVEL, Sec. 24. T1 iN, R14E. UM Btmhole Loc. 2528'FNL, 1318'FEL, Sec. 14, TllN, R14E, UM Dear Ms. Oba: Enclosed is the approved application for permit to redrill the above referenced xvell. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to xvitness a test of BOPE installed prior to drilling new hole. Notice ma3' be given field inspector on the North Slope pager at 659-3607. David W.,Johnston \ ~ Chairman ~ BY ORDER OF THE COMMISSION dlf/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. '- ..... STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIS'S~ON PERMIT TO DRILL 20 AAC 2,5.005 la. Type of Work Drill_ Redrill ~ lb, Type of Well Exploratory_ Stratigraphic Test_ Development Oil_~X Re-Entry__ Deepen _ Service_ Development Gas _ Single Zone ~ Multiple Zone. 2. Name of Operator 5.Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 53' 3. Address 6. Property Designation P.O. Box 100360 Prudhoe Bay Field Anchorage, AK 99510-0360 ADL 028307 Prudhoe Bay Oil Pool 4, Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 893' SNL, 236' WEL, Sec 24, TllN, R14E, UM Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 527' NSL, 3881' WEL, Sec 13, TllN, R14E, UM 18-27B #U-630610 At total depth 9. Approximate spud date Amount (Proposed) 2528' FNL, 1318' FEL, Sec 14, T11N, R14E, UM October, 1998 $200,000 12. Distance to nearesl I 1:3. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line I No Close Approach 14418' MD / 8723' TVD 16. To be completed tor deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) kickoff depth 13130' MD Maximum hole angle 90° Maximum sudace 2800 psig At total depth (TVD) 3430 psi,q @ 8800' 18. Casing program Setting Depth Size Specification Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4 2-7/8" 6.4 L-80 FL4S 1368' 13050' 8673' 14418' 8723' 8 bbls 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 14560 feet Plugs(measured) PBTD Tagged @ 12528' MD (7/2/98) true vertical 8663 feet Effective depth: measured 12528 feet Junk (measured) true vertical 8679 feet Casing Length Size Cemented Measured depth True Vertical depth Conductor 110' 20" 2000 # CS II 110' 110' Surface 3446' 13-3/8" 2706 ft3 CS III & 460 ft3 G 3497' 3497' Production 9018' 9-5/8" 2217 ft3 Class G 9069' 8258' Liner 981' 7" 398 f¢ Class G 9827' 8618' Perloration depth: measured 13270'- 13570'; 13650'- 13890'; 13930'- 13980'; 14010'- 14150'; 14200'- 14450'. true vertical 8668' - 8670'; 8669' - 8665'; 8666' - 8664'; 8663' - 8663'; 8664' - 8666'. ,-':daska Anchorage 20. Attachments Filing fee .~x Property plat _ BOP Sketch X Diverter Sketch _ Drilling program X Drillin,q fluid program __ Time vs depth plot _ Refraction analysis _ Seabed report 20 AAC 25.0,50 requirements .. 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Questions: CaTsteve Ward @ 265-1305. Signe,-~//~,4~ '~ .. ~ TitHe Engineering Supervisor Date "~rin Oba ' ~ Commission Use Only Prepared by Paul Rauf 263-4990 Permit Number I APInumber ~ Approval date See cover letter for ~ ~:~ --//~ ~-~ 50- ~ ~ ~-- 2.. ,~. ~-2-,,/" ~ ~' ~) "' ~,~;~ other requirements Conditions of approval Samples required _Yes _~"No Mud Icg required Yes Hydrogen sulfide measures _ Yes~No Directional survey required )~'~es _ No Required working pressure for BOPE _ 2M; _ SM; ~ 5M; _ 10M; _ 15M _X 3500 psi for CTU Other: Original Signea ~y David W, Johnston byorder of Appr. oved by Commissioner the commission Date / Form 10-401 Rev. 7-24-89 Submit in triplicate -: ..... STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSioN PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Drill _ Redrill ~ lb. Type of Well Exploratory_ Stratigraphic Test_ Development Oil Re-Entry_ Deepen _ Service_ Development Gas_ Single Zone ~ Multiple Zone_ 2. Name of Operator 5.Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 53' 9. Address 6. Property Designation P.O. Box 100360 Prudhoe Bay Field Anchorage, AK 99510-0360 ADL 028307 Prudhoe Bay Oil Pool 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 893' SNL, 236' WEL, Sec 24, TllN, R14E, UM Prudhoe Bay Unit Statewide At top of productive interval 8. Well number Number 527' NSL, 3881' WEL, Sec 13, T11N, R14E, UM 18-27B #U-630610 At total depth 9. Appro~dmate spud date Amount (Proposed) 2528' FNL, 1318' FEL, Sec 14, T11N, R14E, UM October, 1998 $200,000 12. Distance to nearest I 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line No Close Approach 14418' MD / 8723' TVD 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) kickoff depth 13130' MD Ma)dmum hole angle 90° Maximum surface 2800 psi.q At total depth (TVD) 3430 psi9 @ 8800' 18. Casing program Setting Depth Size Specification Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 3-3/4 2-7/8" 6.4 L-80 FL4S 1368' 13050' 8673' 14418' 8723' 8 bbls 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured 14560 feet Plugs(measured) PBTD Tagged @ 12528' MD (7/2/98) true vertical 8663 feet Effective depth: measured 12528 feet Junk (measured) true vertical 8679 feet Casing Length Size Cemented Measured depth True Vertical depth Conductor 110' 20" 2000 # CS II 110' 110' Surface 3446' 13-3/8" 2706 ft3 CS III & 460 ft3 G 3497' 3497' Production 9018' 9-5/8" 2217 ft3 Class G 9069' 8258' Liner 981' 7" 398 ft3 Class G 9827' 8618' Liner 5879' 4-1/2" 832 ft3 Class G 14557' 8662' Perforation depth: measured 13270'- 13570'; 13650'- 13890'; 13930'- 13980'; 14010'- 14150'; 14200'- 14450'. true vertical 8668' - 8670'; 8669' - 8665'; 8666' - 8664'; 8663' - 8663'; 8664' - 8666'. 20. Attachments Filing fee __X Property plat _ BOP Sketch __X Diverter Sketch _ Drilling program x Drilling fluid program __ Time vs depth plot_ Refraction analysis _ Seabed report-- 20 AAC 25.050 requirements _ 21. I hereby certily that the foregoing is true and correct to the best of my knowledge Questions: Ca//Steve Ward @ 265-1305. Signed --~ ~/~._.~ ~"~ . . ~ Titlle Engineering Supervisor Date "~rin Oba Commission Use Only Prepared by Paul Rau! 263-4990 Po rmi~m b~,~;~ ~, I APl number See cover letter for Conditions of approval Samples requked _Yes ~X~'No Mud log required _ Yee ;.~-~o Hydrogen sulfide measures _ Yes .~_ No Directional eurvey required ~Yes _ No Required working pressure for BOPE _ 2M; _ SM; ~,~SM; _ 10M; _ 15M __X ~500 psi for CTU Other: by order of Approvedby ~vid W. Johnston Commissioner the commission Date Form 10-401 Rev. 7-24-89 Submit in triplicate DS 18-27B CT Sidetrack and Completion Intended Procedure Objective: Plugback existing wellbore. Directionally drill a horizontal well from the existing wellbore. Complete with 2-7/8" cemented liner. Perforate and produce. Intended Procedure: MIRU CTU. Test BOPE. RIH and set EZSV cement retainer ~ 13200' md. Cement squeeze and plugback the existing completion to - 13150' md. RDMO CTU. MIRU CDR-1. Test BOPE. Set whipstock ~ 13130' md. Mill window in 4-1/2" liner at -13130' md. Drill 10' of formation with 8.9 ppg Flopro fluid and perform Leak off test to 9.4 ppg. Directionally drill 3.75" x 1200' horizontal well to access Lower Romeo reserves. Drill pilot hole to define formation target. Plugback pilot hole. Perform openhole kick-off and drill horizontal well in formation target. Build angle to -90° at TD. · Run and cement 2-7/8" liner to TD. · Perforate selected intervals. · Place well on production. September 21, 1998 4-1/2"Camco BaI-O Nipple 2223' 4-1/2" TOL 8692' 7"TOL 8829' 9-5/8" Csg 9075' Shoe 4-1/2" Otis "X" Nipple 4-1/2" TT DS 18-27B Proposed Wellbore Sketch Sidetrack and Completion /2" Production Tubing 4-1/2" GLM's 9-5/8" Prod. PKR. @ 8629' md 9204' · 9812' z '- Window in 7" 9827' -9850' EZS V 9852' Initial perfs z'd 7" Csg. Shoe 10627' 3.8" window cut in 4-' liner @ 13130' - 13 EZSV Cmt. ret. @ 13200' Alaska, S,~u~u~e: D.S. 18 Field : Pr~dhoe Boy' Well: 18- g.7 : N or-th Slope, Alaska ! ! ~ ! <- West (feet) I ~ I ! I = I ! I ! I , I = ! I I I a- 27Gel-~ ]~1 T,D, ~ Epd I~l' Dram - I~J 7G~.~I Tyd4 364~i,1~ N, 62 71.,~ W I I I Ii I \ ! 'I,D, & Epa oF Drab - BTOCLO0 T~d, ~b'75,D7 Iq, 5C~Zi,G'7 ~ \ 1Tff ;- - B~.:20,r;,,,B 'lvd, 231~,.;I) lq, 5&55,B.T 'W ~ ',, ',, · T,~ ~ - I;~77 yr.,, 13D30,OD kid, B~D,~ 'lvd, .,~1 1,46 ~ . I , I . I . I i I i I . I . I . I . I 4(3~0 41 ~ 420(3 4:~3 44'fid 4aDD 4~DO 4";q~] 4eaa 4,,a~ Vertical Sectlon (feet) Azlmuih 34J;,3g with reference 0,(I0 N, 0,00 E from Drilling Wellhead Detail ',-._ ~ ~ CT Injector Head ,~~ _ I ~ Stuffing Box (Pack-Off), 10,000 psi Working Pressure I _ 7" Riser Methanol Injection Otis 7" WLA Quick I~ ~ Connect I I I Annular BOP (Hydril),7-1/16" ID 5,000 psi working pressure Alignment Guide Flange 7-1/16", 5M Ram Type Dual f Gate BOPE Flanged Fire Resistant Man Kelly Hose to Dual HCR Choke Manifold Cutters or Combination CuttedBlinds Slip / Pipe rams Manual Valves Drilling spool 7-1/16", 5M by 7-1/16", 5M Ram Type Dual Gate BOPE Hydraulic over Electric ~ 7-1/16" ID with Pipe/Slip Rams Manual Master Valve 0.458' (5.5") 2" Pump-In Hanger Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold 9-5/8" Annulus 13-3/8" Annulus ii .~. Ala,ska LAY'OUT Company: Well: Calculation Method: Vertical Sect. Plane: Vertical Sect. Plane: Measured Depth from: Truc Vertical Depth: Proposal Calculations , ,/o'/- //~'/~ Coordinates provided in: TRUE and GRID relative to Wellhead and AI~ASKA STATE PLAN ARCO Alaska, Inc. 18-27 Pilot Hole Minimum Curvature 343.490 TRUE 342.030 GRID RKB Sca level Rig: CDR - Nabors/Transocean Field: Prudhoe Bay, Alaska Mag. Declination: 28.030 Grid Correction: 1.460 Total Correction: 26.570 RKB Height: 50.9 Coords.- TRUE E(+)/W(-) Dep.(X) -5965.03 Coords.- ASP N(+)/S(-) Lat. (Y) E(+)/W(-) Dep.(X) 685500.95 Coords.-GRID 5963120.66 N(+)/S(-) Lat. (Y) 2149.66 -6021.75 -5977.43 5963142.04 685488.00 2171.04 -6034.70 -5989.31 5963163.73 685475.57 2192.73 -6047.13 -6000.65 5963185.71 685463.66 2214.71 -6059.04 -6002.86 5963190.14 685461.34 2219.14 -6061.36 -6011.46 5963207.97 685452.28 2236.97 -6070.42 -6015.63 5963216.95 685447.88 2245.95 -6074.82 -6021.82 5963230.44 685441.35 2259.44 -6081.35 -6032.06 5963252.87 685430.53 2281.87 -6092.17 -6042.18 -6044.19 5963275.14 -6052. ! 5 685419.84 2304.14 -6102.86 5963279.56 685417.72 2308.56 -6104.98 5963297.15 685409.31 2326.15 -6113.39 5963312.23 685402.11 2341.23 -6120.59 5963318.78 685399.00 2347.78 -6123.70 5963319.27 685398.76 2348.27 -6123.94 5963339.37 685389.19 2368.37 -6133.51 5963358.32 685380.17 2387.32 -6142.53 5963375.18 685372.14 2404.18 -6150.56 5963389.57 685365.29 2418.57 -6157.41 5963389.87 685365.15 5963389.96 685365.10 2418.87 2418.96 -6157.55 -6157.60 Job No: AFE No: BHI Rep: Job Start Date: Job End Date: DLS (°/100 it): 100.00 Comments Tie in Position Kick off Point 3 T.D. Compauy: Wclh Calculation Method: Vertical Sect. Plane: Vertical Sect. Plane: Me:~qurcd Depth from: True Vertical Depth: Proposal Calculations / £--2_ ?z~ Coordinates provided in: TRUE and GRID relative to Wellhead and ALASKA STATE PLAN ARCO Alaska, Inc. 18-27B Minimum Curvature 343.490 TRUE 342.030 GRID RKB Sea level Rig: CDR - Nabors/l'ransocean Field: Prudhoe Bay, Alaska Mag. Declination: 28.030 Grid Correction: 1.460 Total Correction: 26.570 RKB Height: 50.9 Coords. - ASP Coords. - GRID N(+)/S(-) E(+)/W(-) Lat. (Y) Dcp. (X) 5963120.66 '685500.95 Coords. - TRUE 2720.21 2745.20 2750.20 2770.20 -6098.01 2795.20 -6098.13 5963142.(N 685488.00 5963163.73 685475.57 5963185.71 685463.66 5963190.14 685461.34 5963207.97 685452.28 5963216.95 685447.88 5963230.44 685441.35 5963252.87 685430.53 5963275.14 685419.84 5963279.56 685417.72 5963297.15 685409.31 5963312.23 685402.11 5963318.86 685399.02 5963341.1)4 685389.63 5963363.88 685381.36 5963368.52 685379.85 5963387.30 685374.25 5963411.21 685368.32 5963435.52 685363.60 5963460.14 685360.10 5963465.09 685359.55 5963484.98 685357.84 5963509.94 685356.82 5963519.72 685356.77 5963534.94 685356.77 5963559.94 685356.57 5963564.94 685356.49 5963584.93 5963609.92 685355.34 2820.20 -6098.51 5963634.90 685354.32 2845.19 -6099.17 5963659.87 685353.02 2850.19 -6099.34 5963664.86 685352.73 2870.17 -6100.10 5963684.821 685351.45 2895.14 -6101.31 59637{119.75 685349.61 2920.10 -6102.78 5963734.66 685347.50 2945.04 -6104.53 5963759.55 685345.12 2950.02 -6104.92 5963764.52 685344.61 Job No: AFE No: BHI Rep: Job Start Date: Job End Date: DLS (°/100 ft): !00.00 Comments ., Tie in Position '{'- Kick off Point 3 /,. 4 Moas. Incl. TRUE GRID Subsea Coords. - TRUE Coords. - ASI' Coords. - GRID Dogleg Tool Face Vertical Baild Turn Depth Angle Azi. Azi. TVD N(+)/S(-) E(+)fW(-) N(+)/S(-) E(+)/W(-) N(+)/S(-) E(+)/W(-) Section Commen~ (dc~) (deg) (deE) (fi) Lat. (Y) Dep. (X) Lat. (Y) Dcp. (X) Lat. (Y) Dep. (X) (°/100ft) (from TI~) (°/100ft) (°/100ft) 13720.00 90.00 355.05 353.59 8670.01 2969.96 -6106.55 59~3784.40 685342.46' 2813.40 -6180.24 2.50 -90.00 4591.63 0.00 -2.50 13745.00 90.00 354.43 352.97 8670.01! 2994.85 -6108.85 59638(19.23 685339.54 2838.23 -6183.16 2.50 -90.00 4616.14 0.00 -2.48 13770.00 90.00 353.80 352.34! 8670.01 3019.72 -6111.41 5963E34.(')3 ~8533~.34 2863.03 -6186.36 2.50 -90.00 4640.70 0.00 -2.52 13795.00 90.00 353.18 351.72 8670.01 3044.56 -6114.24 59~3858.79 685332.88 2887.79 -6189.82 2.50 -90.00 4665.31 0.00 -2.48 13800.00 90.00 353.05 351.59 8670.01 3049.52 -6114.84 5963863.73 685332.15 2892.73 -6190.55 2.50 -90.00 4670.24 0.00 -2.60 13820.00 90.00 352.56 351.10 8670.01 3069.36 -6117.35 59638~3.51 685329.14 2912.51 -6193.56 2.50 -90.00 4689.97 0.00 -2.45 13845.00 90.00 351.93 350.47 8670.01 3094.14 -6120.72 596391)8.18 685325.14 2937.18 -6197.56 2.50 -90.00 4714.67 0.00 -2.52 13870.00 90.00 351.31 349.85 8670.01 3118.87 -6124.36 5963932.81 685320.86 2961.81 -6201.84 2.50 -90.00 4739.42 0.00 -2.48 13895.00 90.00 350.68 349.22 8670.01 3143.56 -6128.28 5963957.40 685316.32 2986.40 -6206.38 2.50 -90.00 4764.20 0.00 -2.52 13900.00 90.00 350.56 349.10 8670.01 3148.49 -6129.09 5963962.31 6S53[5.38 2991.31 -6207.32 2.50 -90.00 4769.16 0.00 -2.40 13920.00 90.00 350.06 348.60 8670.01 3168.21 -6132.46 ~%3981.~3 685311.52 3010.93 -6211.18 2.50 -90.00 4789.01 0.00 -2.50 13945.00 90.00 349.43 347.97 8670.01 3192.81 -6136.91 ~%4006.41 685306.44 3035.41 -6216.26 2.50 -90.00 4813.86 0.00 -2.52 13970.00 90.00 348.81 347.35 8670.01 3217.36 -6141.63 5964030.83 685301.10 3059.83 -6221.60 2.50 -90.00 4838.73 0.00 -2.48 13995.00 90.00 348.18 346.72 8670.01 3241.86 -6146.61 5964055.20 685295.49 3084.20 -6227.21 2.50 -90.00 4863.63 0.00 -2.52 14000.00 90.00 348.06 346.60 8670.01 3246.75 -6147.64 5964f)6(~.06 685294.33 3089.06 -6228.37 2.50 -90.00 4868.62 0.00 -2.40 i4020.00 90.00 347.56 346. i0 8670.0i 3266.30 -6i5i.87 5964079.50 685289.6i 3i08.50 -6233.09 2.50 -90.00 4888.56 0.00 -2.5~ 14045.00 90.00 346.93 345.47 8670.01 3290.68 -6157.39 5964103.73 685283.48 3132.73 -6239.22 2.50 -90.00 4913.50 0.00 -2.521 14070.00 90.00 346.31 344.85 8670.01 3315.00 -6163.17 5964127.90 685277.07 3156.90 -6245.63 2.50 -90.00 4938.46 0.00 -2.48 14095.00 90.00 345.68 344.22 8670.01 3339.26 -6169.22 5964151.99 6852711).41 3180.99 -6252.29 2.50 -90.00 4963.43 0.00 -2.52 14100.00 90.00 345.56 344.10 8670.0 3344.10 -6170.46 5964156.80 685269.04 3185.80 -6253.66 2.50 -90.00 4968.43 0.00 -2.40 14120.00 90.00! 345.06 343.60 8670.0 3363.45 -6175.54 5964176.01 685263.48 3205.01 -6259.22 2.50 -90.00 4988.42 0.00 -2.50 14145.00 90.00 344.44 342.98 8670.01 3387.57 -6182.11 5964199.96 685256.29 3228.96 -6266.41 2.50 -90.00 5013.41 0.00 -2.48 14170.00 90.00 343.81 342.35 8670.01 3411.62 -6188.95 5964223.82 685248.84 3252.82 -6273.86 2.50 -90.00 5038.41 0.00! -2.52 14195.00 90.00 343.19 341.73 8670.0 3435.59 -6196.05 5964247.60 685241.13 3276.60 -6281.57 2.50 -90.00 5063.41 0.00 -2.48 14200.00 90.00 343.06 341.60 8670.0 3440.37 -6197.50 5964252.35 685239.56 3281.35 -6283.14 2.50 -90.00 5068.41 0.00 -2.60 14220.00 90.00 342.56 341.10 8670.0 3459.48 -6203.41 5964271.30 685233.16 3300.30 -6289.54 2.50 -90.00 5088.41 0.00 -2.50 14245.00 90.00 341.94 340.48 8670.01 3483.29 -6211.03 59(N294.9t 685224.94 3323.91 -6297.76 2.50 -90.00 5113.40 0.00 -2.48 14270.00 90.00 341.31 339.85 8670.01 3507.01 -6218.91 5964318.42 685216.46 3347.42 -6306.24 2.50 -90.00 5138.39 0.00 -2.52 14295.00 90.00 340.69 339.23 8670.01 3530.65 -6227.05 5964341.85 685207.72 3370.85 -6314.98 2.50 -90.00 5163.37 0.00 -2.48 14300.00 90.00 340.56 339.10 8670.01 3535.37 -6228.71 5964346.52 685205.94 3375.52 -63t6.76 2.50 -90.00 5168.36 0.00 -2.60 14320.00 90.00 340.06 338.60 8670.01 3554.20 -6235.45 5964365.17 685198.72 3394.17 -6323.98 2.50 -90.00 5188.33 0.00 -2.50 14345.00 90.00 339.44 337.98 8670.01 357T65 -6244.10 5964388.40 685189.47 3417.40 -6333.23 2.50 -90.00 5213.28 0.00 -2.48 14370.00 90.00 338.81 337.35 8670.01 3601.01 -6253.01 5964411.52 685179.97 3440.52 -6342.73 2.50 -90.00 5238.21 0.00 -2.52 14395.00 90.00 338.19 336.73 8670.01 3624.27 -6262.17 5964434.54 685170.22 3463.54 -6352.48 2.50 -90.00 5263.12! 0.00 -2.48 14400.00 90.00 338.06 336.60 8670.01 3628.91 -6264.04 5964439.13 685168.24 3468.13 -6354.46 2.50 -90.00 5268.10 0.00 -2.60 14418.45 90.00 337.60 336.14 8670.01 3646.00 -6271.00 5964456.04 685160.85 3485.04 -6361.85 2.50 0.00 5286.46 0.00 -2.49 T.D. Compauy: Well: Calculation Method: Vertical Sect. Plane: Vertical Sect. Plane: Measured Depth from: True Vertical Depth: Proposal Calculations / £.-?_ ?/¢' Coordinates provided in: TRUE and GRID relative to Wellhead and ALASKA STATE PLAN ARC() Alaska, Inc. 18-27B Minimum Curvature 343.49O TRUE 342.030 GRID RKB Sea level Rig: CDR - Naborsfl'ransocean Field: Pr~dhoe Bay, Alaska Mag. Declination: 28.030 Grid Correclion: 1.460 Total Correction: 26.570 RKB Height: 50.9 Coords. - TRUIq Dcp. (X) -5965.03 (Mords. - ASP N(+)/SI-) l,a~. 2670.23 2695.22 2704.99 2720.21 Dep. 5963120.66 685500.05 -5977.43 5963142.04 685488.00 -5989.31 5063163.73 685475.57 -6000.65 5063185.71 685463.66 -6002.86 5063190.14 685461.34 -6011.46 5[)63207.!)7 685452.28 -6015.63 5!)63216.95 685447.88 -6021.82 5063230.44 685441.35 -6032.06 5063252.87 68543(I.53 -6042.18 2745.20 -6098.17 2750.20 -6098.12 5[)63275.14 68541 !).84 5963279.56 685417.72 5!)63297.15 6854(19.3 I 5%3312.23 685402. I 1 5963318.86 685399.02 5963341.1)4 5963363.88 5963368.52 5963387.30 5063411.21 5063435.52 5963460.14 5!)63,465.09 596348.4.(i}8 5963509,94 5*)63519,72 5963534.94 5963559.94 5963564.94 2770.20 -6098.01 5963584.93 2795.20 -6098.13 2820.20 -6098.51 5963634.90 2845.19 -6099.17 5963659.87 2850.19 -6099.34 5963664.86 2870.17 -6100.10 2895.14 -6101.31 2950.02 -6104.92 5963684.82 5963709.75 2920.10 -6102.78 5963734.66 2945.04 -6104.53 596375!).55 5963764.52 Coords. - GRID N(+)/S(-) 2149.66 2171.04 2192.73 2214.71 2219.14 2236.97 2245.95 2259.44 2281.87 2304.14 2308.56 -6104.98 2326.15 2341.23 2347.86 -6123.68 685389.63 2370.04 -6133.07 685381.36 2392.88 -6141.34 685379.85 2397.52 -6142.85 685374.25 -6148.45 685368.32 685363.60 685360.10 685359.55 685357.84 685356.82 685356.77 685356.77 685356.57 685356.4!) 685356.(1!) 685355.34 685354.32 685353.02 685352.73 685351.45 685349.61 685347.50 685345.12 685344..6t -6154.38 -6159.10 -6162.60 -6163.15 Job No: AFE No: Bill Rep: Job Slarl Dale: Job Eud Date: I)I,S C'/IO0 fl): Comments Tie in Position Kick off Point 3 4 Meas. Incl. TRUE GRID Suhsea Coords. - TRUE Coords. - ASI' Coords. - GRID Dngleg Tool Face Vertical Baild Turn Depth Angle Azi. Azi. TVD N(+)/S(-) E(+)/W(-) N(+)/S(-~ E(+)~¥(-) N(+)/S(-) E(+)/W(-) Seclioa Comments (de$) (deg) (de~) (fl) Lat. (Y) Dep. (X) 1,at. (Y) Bop. (X) Lat. (Y) Dep. (X) (°/1001't) (from TIP) ('°/1001't) (°/100fl) 13720.00 90.00 355.051 353.59 8670.01 2969.96 -6106.55 5963784.40 685342.46 2813.40 -6180.24 2.50 -90.00 4591.63 0.00 -2.50 13745.00 90.00 354.43 352.97 8670.01 2994.85 -6108.85 5063800.23 68533~).54 2838.23 -6183.16 2.50 -90.00 4616.14 0.00 -2.48 13770.00 90.00 353.80 352.34 8670,01 3019.72 -6111.41 5963834.(13 68533(,.34 2863.03 -6186.36 2.50 -90.00 4640.70 0.00 -2.52 13795.00 90.00 353.18 351.72 8670,01 3044.56 -6114.24 5963858.79 685332.88 2887.79 -6189.82 2.50 -90.00 4665.31 0.00 -2.48 13800.00 90.00 353.05 351.59 8670,01 3049.52 -6114.84 5063863.73 685332.15 2892.73 -6190.55 2.50 -90.00~ 4670.24 0.00 -2.60 13820.00 90.00 352.56 351.10 8670,01 3069.36 -6117.35 5963883.5l 685329.141 2912.51 -6193.56 2.50 -90.00 4689.97 0.00 -2.45 13845.00 90.00 351.93 350.47 8670.01 3094.14 -6120.72 5963908.18 685325.14 2937.18 -6197.56 2.50 -90.00 4714.67 0.00 -2.52 13870.00. 90.00 351.31 349.85 8670.01 3118.87 -6124.36 5063932.81 685320.86: 2961.81 -6201.84 2.50 -90.00 4739.42 0.00 -2.48 13895.00 90.00 350.68 349.22 8670.01~ 3143.56 -6128.28 5963%7.40 685316.32 2986.40 -6206.38 2.50 -90.00 4764.20 0.00 -2.52 13900.00 90.00 350.56 349.10 8670.01 3148.49 -6129.09 5963962.31 685315.38 2991.31 -6207.32 2.50 -90.00 4769.16 0.00 -2.40 13920.00 90.00 350.06 348.60 8670.01 3168.21 -6132.46 5963981.{'}3 685311.52 3010.93 -6211.18 2.50 -90.00 4789.01 0.00 -2.50 13945.00 90.00 349.43 347.97 8670.01 3192.81 -6136.91 5964006.41 685306.44 3035.41 -6216.26 2.50 -90.00 4813.86 0.00 -2.52 13970.00 90.00 348.81 347.35 8670.01 3217.36 -6141.63 5964030.83 68530~. 10 3059.83 -6221.60 2.50 -90.00 4838.73 0.00 -2.48 13995.00 90.00 348.18 346.72 8670.01 3241.86 -6146.61 5964055.20 685205.49 3084.20 -6227.21 2.50 -90.00 4863.63 0.00 -2.52 14000.00 90.00 348.06 346.60 8670.01 3246.75 -6147.64 5964()60.06 685294.33 3089.06 -6228.37 2.50 -90.00 4868.62 0.00 -2.40 14020.00 90.00 347.56 346. 101 8670.01 3266.30 -6151.87 59641'179.50 685289.61 3108.50 -6233.09 2.50 -90.00 4888.56 0.00 -2.50 14045.00 90.00 346.93 345.47 8670.01 3290.68 -6157.39 5964103.73 685283.48 3132.73 -6239.22 2.50 -90.00 4913.50 0.00 -2.52 14070.00 90.00 346.3 344.85 8670.01 3315.00 -6163.17 55)64127.90 685277.07 3156.90 -6245.63 2.50 -90.00 4938.46 0.00 -2.48 14095.00 90.00 345.68 344.22' 8670.01 3339.26 -6169.22 5964151.99 685270.41 3180.99 -6252.29 2.50 -90.00 4963.43 0.00 -2.52 14100.00 90.00 345.56 344. I 0 8670.01 3344.10 -6170.46 5964156.80 685269.04 3185.80 -6253.66 2.50 -90.00 4968.43 0.00 -2,40 14120.00 90.00 345.06 343.60 8670.01 3363.45 -6175.54 5964176.01 685263.48 3205.01 -6259.22 2.50 -90.00 4988.42 0.00 -2.50 14145.00 90.00 344.44 342.98 8670.01 3387.57 -6182. I I 59641!)9.96 685256.2t) 3228.96 -6266.41 2.50 -90.00 5013.4 0.00 -2.48 14170.00 90.00 343.8 342.35 8670.01 3411.62 -6188.95 5964223.82 685248.84 3252.82 -6273.86 2.50 -90.00 5038.41 0.00 -2,52 14195.00 90.00 343.19 341.73 8670.01 3435.59 -6196.05 5964247.60 68524 I. 13 3276.60 -6281.57 2.50 -90.00 5063.4 0.00 -2,48 14200.00 90.00 343.06 341.60 8670.01 3440.37 -6197.50 5964252.35 685239.56 3281.35 -6283.14 2.50 -90.00 5068.4 0.00 -2.60 14220.00 90.00 342.56 341.10 8670.01 3459.48 -6203.41 5964271.30 685233.16 3300.30 -6289.54 2.501 -90.00 5088.4 0.00 -2.50 14245.00 90.00 341.941 340.48 8670.01 3483.29 -6211.03 5964294.01 685224.94 3323.91 -6297.76 2.50 -90.00 5113.40 0.00 -2,48 14270.00 90.00 341.31 339.85 8670.0 3507.01 -6218.91 5964318.42 685216.46 3347.42 -6306.24 2.50 -90.00 5138.39 0.00 -2.52 14295.00 90.00 340.69' 339.23 8670.01 3530.65 -6227.05 5964341.85 6852('17.72 3370.85 -6314.98 2.50 -90.00 5163.37 0.00 -2.48 14300.00 90.00 340.56 339.10 8670.0 3535.37 -6228.71 5964346.52 685205.94 3375.52 -6316.76 2.50 -90.00 5168.36 0.00 -2.60 14320.00 90.00 340.06 338.60 8670.01 3554.20 -6235.45 5964365.17 685198.72 3394.17 -6323.98 2.50 -90.00 5188.33 0.00 -2.50 14345.00 90.00 339.44 337.98 8670.01 3577.65 -6244.10 5964388.40 685189.47 3417.40 -6333.23 2.50 -90.00 5213.28 0.00 -2.48 14370.00 90.00 338.81 337.35 8670.01 3601.01 -6253.01 5964411.52 685179.97 3440.52 -6342.73 2.50 ~90.00 5238.21 0.00 -2.52 14395.00 90.00 338.19 336.73 8670.01 3624.27 -6262.17 5964434.54 685170.22 3463.54 -6352.48 2.50 -90.00 5263,12 0.00 -2.48 , , 14400.00 90.00 338.06 336.60 8670.01 3628.91 -6264.04 5964439.13 685168.24 3468.13 -6354.46 2.50 -90.00 5268.10 0.00 -2.60 14418.45 90.00 337.60 336.14 8670.01 3646.00 -6271.00 5964456.(!4 685160.85 3485.04 -6361.85 2.50 0.00 5286.46 0.00 -2.49 T.D. ..3 T Drilling Wellhead Detail Methanol Injection Otis 7" WLA Quick Connect O% I -- CT Injector Head ~~~._% Stuffing Box (Pack-Off), 10,000 psi Working Pressure 7" Riser Annular BOP (Hydril),7-1/16" ID 5,000 psi working pressure Alignment Guide Flange 7-1/16", 5M Ram Tyl 'ual ~- Gate BOPE Flanged Fire Resistant Man Kelly Hose to Dual FICR Choke Manifold ,) Cutters or Combination Cutter/Blinds Slip / Pipe rams Manual Valves Drilling spool 7-1/16", 5M by 7-1/16", 5M Ram Type Dual Gate BOPE Hydraulic over Electric ~- 7-1/16" ID with Pipe/Slip Rams Manual Master Valve 0.458' (5.5") 2" Pump-In Hanger Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on DS Hardline to Standpipe manifold 9-5/8" Annulus 13-3/8" Annulus 1. Type of request: Abandon _X Suspend _ Oper~_~m Sr, utd~w,- ne-~ =,u..~,,.~ ..... Alter casing _ 'oak wail _ Plugging _X Time extension _ SlJmu~ate _ Change approved progra~ _ lubing _ Variance _ Perforate _ Off, er _ 2. Name of Operator. 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. D~velo~t_X 53' RKB 3. Address: Exp~o~ate,'7__ 7. Unit or Property: P.O. Box 100360 Sb'atagrapic _ Anchorage, AK 99510-0360 ~r~ce_ Prudhoe Bay Unit 14. Location of well at surface: 8. Well number: 893' SNL, 236' WEL, Sec 24, TllN, R14E, UM 18-27A At top of productive interval: 9. Permit number. 527' NSL, 3881' WEL, Sec 13, T11N. R14E, UM 98-046 At effective depth: 10. APl number: 50-029-22321-01 At total depth: 11. Field/Pool: 2886' NSL. 1343' WEL, Sec 14, T11N, R14E, UM Prudhoe Bay Oil Pool 12. Present well condition summary Total Depth: measured 14560 feet Plugs (measured) PBTD Tagged @ 112528' MD (7/2/98) true verticat 8663 feet . Effective Depth: measured 12528 feet Junk (measured) - -- .. true vertical 8679 feet .... · Casing Lencjl~ SEe Cemented Measured depth True vertical depth Conductor 110' 20' 2000 # CS II 110' 110' Surface 3446' 13-3/8' 2706 f¢ CS ~ll & 460 ~ G 3497' 3497' Production 9018' 9-5/8' 2217 fta Class G 9069' 8258' Liner 981' 7" 398 ft~ Class G 9827' 8618' Liner 5879' 4-1/2' 832 ft~ Class G 14557' 8662' Perforation Depth measured 13270'-13570'; 13650'-13890'; 13930'-13980'; 14010'-14150'; 14200'-14450' true vertical 8668'- 8670'; 8669' - 8665'; 8666' - 8664'; 8663'- 8663'; 8664'- 8666' Tubing (size. grade, and measured depth) 4-1/2", 12.6#, L-80 Tbg @ 8684' MD. " Packe~s and SSSV (type and measured deqth) 9-5/8" Baker S-3 Packer NSCT @ 8629' MD; 4-1/2" Camco Bal~O SVLN @ 2223' MD. 13. Attachments Description summa~ of proposal X Detailed operations pro, ram _ BOP sketch _X 14. Estimated date for commencing operation 15. Status of well classification as: September, 1998 Oil _X Gas _ Suspended _ 16. If proposal was verbally approved Name of approver Date approved Service . 17. I hereby certih/that the forgoing is true an~ correct to the best of my knowledge. Questions: Call Steve Ward at 265-1305. Signed '~~ ~3~ . ~ Title: Engineering Supervisor Date Erin Oba FOR COMMISSION USE ONLY Prepared by Paul Rauf 263-4990 Comission so reoresentitive may witness,.. ~,,,~ Appr°val N°~'~/ Cond~ions approval: N°tifYPlug integrety ~ BOP test _~ Location clearance ~ ~,.j~ - .. Uechan~,~nte~re~te~t_ Su~e,uentfo~re,uired~O-~'~'~ --~oq*~.o~ ¢~ navid \~ Johnsto Approved b7 ordero~the Commissioner ~ ' ~ Commissioner Date /SS/on Form 10-403 Rev 06/15188 SUBMIT IN TRIPLICATE WELL pERMi~F CHECKLIST COMPANY FIELD & POOL ADMINISTRATION WELL NAME ENGINEERING INIT CLASS P~-y.-" /'-~/Y GEOLAREA 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper dislance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected party ................... 10. Operator has appropriate bond in force ............. 11. Permil can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CM'I' vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequale to tie-in long string to surf csg ........ 18. cur will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit .............. ... · 21. If a re-drill, has a ~0-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs. do they meet regulation ................ ~ NN 26. BOPE press rating appropriate; test to _.,x-~ psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... . .'-) .~. ,, 29. Is presence of H2S gas probable ................. Permit can be issued w/o hydrogen sulfide measures ..... ,~Y'Y' .N~~,_~, Data presented on potential overpressure zones ....... Seismic analysis of shallow gas zones ..... ' ........ Seabed condition survey (if off-shore) ............. Y..N Y N APPR D~TE) Con. tacl.nam, elphon.e.for weekly progress reports ....... l exp~ora~ory omy$ ANNULAR DISPOSAL APPR DATE 30. 31. 32. 33. 34. UIO/,An~ular /?...2_.:.~.,_~~' PROGRAM: exp I-I dev,", redrll~serv I-I wellbore segl, ann. disposal para req,, (~?~:~ UNIT# ON/OFF SHORE ~,,~3_~..~ ..... Y,N Y N Y N Y N Y N Y N Y N Y N Y N '~N~N ~J-(-'r Y N Y N 35. With proper cementing records, this plan (A) will contain Waste in a suitable receiving zone; ....... (B) will not cont~minale freshwater; or cause drilling Waste... to, surface; (C) wil~"~;i~i.mpair~echanical integrity of the well used for disposal; (D) will not damage'~roducing formation Or impair reCOvery from a pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. GEOL,OGY: ENGINEERING: BE, .W~b.$ JDH ._~--- M;cJ3eklisl rev 05~29~98 rill C. ~m~,off i('.o~.w(~l dia~]~di nr ,; ~\, t ~¢,1. h r.I Y N Y N y N COMMISSION: OWJ~ ~.~~. RNC co ,, , CommentS/Instructions: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility Wed Mar 24 12:27:51 1999 Reel Header Service name ............. LISTPE Date ..................... 99/03/24 Origin ................... STS Reel Name ................ IINKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/03/24 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MWD RUN 1 AK-MW- 80423 D. LONG M. JOHNSON 18-27B 500292232102 ARCO ALASKA, INC. SPERRY-SIINDRILLING SERVICES 24-MAR-99 lin 14E 893 236 50.90 50.90 .00 RECEIVED 1999 AlaskaOit& 6as Cons. WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.625 9075.0 7.000 10627.0 4.500 13130.0 3.750 13493.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL WITH SCINTILLATION TYPE GAMMA RAY (NGP). 3. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE PHONE CONVERSATION BETWEEN MARSHALL MI/NYAK OF SPERRY-SUN DRILLING SERVICES AND DEDE SCHWARTZ OF ARCO ALASKA, INC. ON 23 MARCH, 1999. SPERRY-SUN MWD DATA IS NOT PRIMARY DEPTH CONTROL FOR WELL 18-27B. THIS IS TO BE CONSIDERED FINAL FIELD DATA DUE TO LACK OF OVERLAP OF PARENT WELLBORE FOR TIE IN. 4. WELL 18-27B WAS PLUGGED BACK AND ABANDONED AFTER MWD RUN 1. 5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 13492'MD, 8700 ' SSTVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRD = SMOOTHED GAMMA RAY. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/24 Maximum Physical Record.. 65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 13137.5 13466.0 ROP 13163.0 13491.5 $ BASELINE CURVF~ FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH EQUIVALENT UNSHIFTED DEPTH MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: BIT RUN NO MERGE TOP MERGE BASE 1 13163.0 13492.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 13137.5 13491.5 13314.5 709 13137.5 ROP 3.57 2825.11 111.631 658 13163 GR 41.05 524.61 104.947 658 13137.5 Last Reading 13491.5 13491.5 13466 First Reading For Entire File .......... 13137.5 Last Reading For Entire File ........... 13491.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/24 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 13137 . 5 13466 . 0 ROP 13163 . 0 13491 . 5 $ LOG HEADER DATA DATE LOGGED: 29 -AUG- 98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 58.3 MAXIMUM ANGLE: 91.1 MSC 1.32 SPC 5.74 PCD 3.01e MEMORY 13492.0 13163.0 13492.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP SPC 40 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 3.750 3.8 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: SEAWATER/FLOPRO 8.90 .0 9.0 6.2 .000 .000 .000 .000 77.3 MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .3 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 1 API 4 1 68 4 2 ROP MWD 1 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 13137.5 13491.5 13314.5 709 13137.5 GR 41.05 524.61 104.947 658 13137.5 ROP 3.57 2825.11 111.631 658 13163 Last Reading 13491.5 13466 13491.5 First Reading For Entire File .......... 13137.5 Last Reading For Entire File ........... 13491.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/03/24 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service na~¢ ............. LISTPE Date ..................... 99/03/24 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 99/03/24 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Scientific Technical Services Physical EOF Physical EOF End Of LIS File