Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-230198-230-0 PRUDHOE BAY UNIT S-11A 50- 029-20728-01 BP EXPLORATION (ALASKA) INC Roll #1: Start: Stop Roll #2: Start Stop MD 11050 TVD 08749 Completion Date: 12/14/98 Completed Status: P&A Current: Name Interval Sent Received T/C/D 9336 2-6 SPERRY MPT/GR/EWR4 OH 9/21/99 9/21/99 D/L DGR/EWR4-MD FINAL 9160-11050 OH 9/30/99 9/30/99 ~/L DGR/EWR4-TVD FINAL 8632-8749 OH 9/30/99 9/30/99 b//R SRVYRPT SPERRY 9099.10-11050. OH 1/19/99 1/19/99 Thursday, January 18, 2001 Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well I-~ Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-230 399-103 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20728-01 4. Location of well at surface :~-=,~-'.*?_~ 9. Unit or Lease Name 1646' SNL, 1855' EWL, SEC. 35, T12N, R12E, UM ? ....... Prudhoe Bay Unit At top of productive interval ~! 10. WelINumber 3333' SNL, 3654' EWL, SEC. 35, T12N, R12E, UM S-11Ai ~~i¢ 11. Field and Pool At total depth 4167' SNL, 5093' EWL, SEC. 35, T12N, R12E, UM '~~~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE = 66.90'I ADL 028257 12. Date Spudded11/27/98 113' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' water depth' if °ffsh°re 16' N°' °f C°mpleti°nsl 2/4/98 12/14/98 N/A MSL Zero 17. Total Depth (MD+TVD)11050 8749 FT1118' Plug Back Depth (MD+TVD)9138 8608 FT 19' Directi°nal SurveY 120' Depth where seeM set 121' Thickness °f Permafr°st~]Yes [~No N/A MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, GR, RES, USIT 23. CASING~ LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP Bo'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20"X 30" Insulated Conductor Surface 110' 36" 8 cu yds concrete 13-3/8" 72# L-80 Surface 2679' 17-1/2" 3767 cuft Arcticset II 9-5/8" 47# L-80 Surface 9136' 12-1/4" 1240 cuft Class 'G', 130 cu ft Arcticset I .......... 7" 26# L-80 8627' 9138' 8-1/2" 390 cuft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) None N/A MD TVD MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 8528' P&A with 47 Bbls Class 'G' 9138' K/O Existing ~hi@sto~.c.k~ 27. PRODUCTION TEST U i ~ I ~ I_ _. ___ " ' ..... Bate First Production I Method of Operation (Flowing, gas lift, etc.) ........ I_~ 1~'' "./ Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-DeL OIL GRAWTY-API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Sag River 9168' 8635' Shublik 9205' 8666' Sadlerochit / Zone 4 9382' 8753' 31. List of Attachments Summary of Daily Drilling Reports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble '~,~//~. ~ Title TechnicalAssistantlll Date S-11Al 98-230 399-103 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. iNSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24.' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Sh.utTI.n, Other-explain. ITEM 28: If no cores taken, indicate 'none'. ;-i:--.-v ':' ''':- Form 10-407 Rev. 07-01-80 Progress Report Facility PBS Pad Well S-11A Page 1 Rig Nabors 7ES Date 11 August 99 Date/Time 14 Nov 98 12:01-06:00 12:01-22:30 22:30 22:30-23:00 23:00 23:00-06:00 23:00-06:00 15 Nov 98 06:00-03:30 06:00-10:30 16 Nov 98 10:30 10:30-20:00 20:00 20:00-03:30 03:30 03:30-06:00 03:30-06:00 06:00-06:15 06:00-06:15 06:15 06:15-07:30 06:15-06:45 06:45 06:45-07:30 07:30 07:30-20:30 07:30-20:30 Duration 17-3/4 hr 10-1/4 hr 1/2 hr 7 hr 7 hr 21-1/2 hr 4-1/2 hr 9-1/2 hr 7-1/2 hr 2-1/2 hr 2-1/2 hr 1/4 hr 1/4 hr 1-1/4 hr 1/2 hr 3/4 hr 13hr 13hr Activity Move rig Rigged down Drillfloor / Derrick PTSM. RD floor & misc equipment. C/O A-leg bridle winch line. Install flow meters in Elmago. Bridle up. PJSM. LD derrick. Work completed, equipment laid out Held safety meeting PJSM w/Peak. Completed operations Rig moved 70.00 % Move sub base, pit module, and camp. Sub base on S-pad. Pit module and camp on Spine Road. Rig moved 70.00-% Finish move pit complex and camp to S-Pad. Set mats and lay herculite. Spot sub over hole. While positioning Pit Module, broke axial pin on right rear bogey. Move rig (cont...) Rig moved 90.00 % (cont...) Finish move pit complex and camp to S-Pad. Set mats and lay herculite. Spot sub over hole. While positioning Pit Module, broke axial pin on right rear bogey. Fluid system failed - Change operation Rigged up Drillfloor / Derrick Prep derrick to raise. Inspect lines.Work on changing out axle assembly on pit module. Raise derrick. RU top drive & floor. Bridle down. Spill Drill; OS-1 min. Equipment work completed Rig moved 100.00 % Set mats and lay herculite. Spot and level mud pits. Finish berms. Spot camp. At well location - Cellar Fluid system Fill pits with Seawater Take on seawater and hook up pit lines. Fluid system (cont...) Fill pits with Seawater (cont...) Take on seawater and hook up pit lines. Completed operations Wellhead work Held safety meeting PreSpud safety meeting with all personnel. Completed operations Removed Hanger plug RU lubricator. Pull BPV. RD lub. Equipment work completed Fluid system Reverse circulated at 8530.0 ft RU to circ well to seawater. Test lines to 3500 psi. Chase down ice plugs in kill line. Attempt to circ to S-35 flowline. Pressured out several times. Took returns to -:'- °-:" ~'-"" ~° A~ sec. [.JIt3. OI. Jlll l. Jllll, %..JO-"l'd Facility Date/Time 17 Nov 98 18 Nov 98 Progress Report PBS Pad Well S-11A Page 2 Rig Nabors 7ES Date 11 August 99 20:30 20:30-00:30 20:30-21:00 21:00 21:00-21:30 21:30 21:30-00:30 00:30 00:30-06:00 00:30-05:00 05:00 05:00-06:00 05:00-06:00 06:00-14:00 06:00-07:00 07:00 07:00-14:00 14:00 14:00-16:30 14:00-16:30 16:30 16:30-20:30 16:30-17:30 17:30 17:30-19:30 19:30 19:30-20:30 20:30 20:30-04:00 20:30-00:00 00:00 00:00-04:00 04:00 04:00-06:00 04:00-06:00 06:00-06:15 06:00-06:15 Duration 4 hr 1/2 hr 1/2 hr 3 hr 5-1/2 hr 4-1/2 hr 1 hr 1 hr 8 hr 1 hr 7 hr 2-1/2 hr 2-1/2 hr 4 hr 1 hr 2 hr 1 hr 7-1/2 hr 3-1/2 hr 4 hr 2 hr 2 hr 1/4 hr 1/4 hr Activity Drill; OS-35 sec. Rev circ well @ 5 bpm. Obtained req. fluid properties - 120.00 %, hole vol. Wellhead work Installed Hanger plug Set TWC. Eqpt. work completed, running tool retrieved Tested Hanger plug Pressure test completed successfully - 1000.000 psi Removed Xmas tree integral components PJSM w/FMC. Remove tree & adapter flange. Equipment work completed Nipple up BOP stack Rigged up BOP stack NU stack on high wellhead. Work completed - BOP stack in position Rigged up Bottom ram Change rams. Rigged up Bottom ram Finish changing lower rams. Nipple up BOP stack (cont...) Rigged up Bottom ram (cont...) Finish changing lower rams. Equipment work completed Tested BOP stack Test BOPE to 250/5000 psi; Annular to 250/3500 psi. Witnessing waived by Blair Wondzell-AOGCC Sr. Engineer. Lower ram to be tested after pulling hanger. D4 Drill. Pressure test completed successfully - 5000.000 psi Wellhead work Removed Hanger plug Pull TWC through lubricator. RD lubricator. Equipment work completed Pull Tubing, 5-1/2in O.D. Removed Tubing hanger MU landing it. BOLDS. Unseat hanger w/195k. Pull to rig floor & LD. Stopped: To circulate Circulated at 8540.0 ft Obtained clean returns - 140.00 % hole volume Laid down 80.0 ft of Tubing 2 joints laid out Wellhead work Set Retrievable packer at 30.0 ft with 700.0 psi MU Storm Packer. Set @ 30'. Test above to 700 psi. Packer set at 30.0 ft Removed Seal assembly Attempt to pull 9 5/8" packoff. No-Go. Heat packoff w/steam. Attempt to pull. Sheared dogs on pulling tool. Aborted equipment work Nipple down BOP stack Removed BOP stack Nipple down BOP stack (cont...) Removed BOP stack (cont...) Progress Report Facility PBS Pad Well S- 1 lA Page 3 Rig Nabors 7ES Date 11 August 99 Date/Time 06:15 06:15-15:15 06:15-07:30 07:30 07:30-08:00 08:00 08:00-13:30 13:30 13:30-15:00 15:00 15:00-15:15 15:15 15:15-17:00 15:15-17:00 17:00 17:00-19:00 17:00-17:30 17:30 17:30-18:45 18:45 18:45-19:00 19:00 19:00-21:00 19:00-21:00 21:00 21:00-06:00 21:00-23:30 23:30 23:30-05:00 19 Nov 98 05:00 05:00-06:00 06:00-13:00 06:00-11:30 11:30 Duration 9 hr 1-1/4 hr 1/2 hr 5-1/2 hr 1-1/2 hr 1/4 hr 1-3/4 hr 1-3/4 hr 2 hr 1/2 hr 1-1/4 hr 1/4 hr 2 hr 2 hr 9 hr 2-1/2 hr 5-1/2 hr 1 hr 7 hr 5-1/2 hr Activity Equipment work completed Wellhead work Removed Tubing head spool ND spool. Packoff stuck in spool. Equipment work completed Installed Seal assembly Install new packoff & RILDS. Equipment work completed, seal energised Rigged up Tubing head spool WO crane & replacement spool. PJSM w/crane operator. Remove tree, adapter, and tubing spool from behind rig. Set in replacement spool. H2S Drill; OS-I:10 min. Work completed - Tubing head spool in position Installed Tubing head spool Set & dress spool. Equipment work completed Tested Seal assembly Test packoff. Pressure test completed successfully - 5000.000 psi Nipple up BOP stack Rigged up BOP stack Fire Drill; OS-45 sec. Work completed - BOP stack in position Test well control equipment Installed BOP test plug assembly Eqpt. work completed, running tool retrieved Tested Bottom ram Tested bottom ram, flange, tbg spool side outlet valves, and packoff to 250/5000 psi. Pressure test completed successfully - 5000.000 psi Retrieved BOP test plug assembly Equipment work completed Wellhead work Retrieved Emergency hang off assembly MU retrieving head. RIH & screw in to storm Packer @ 30'. POH & LD same. Equipment work completed Pull Single completion, 5-1/2in O.D. Rigged up Tubing handling equipment PJSM w/HES on control line spooler. Work completed - Tubing handling equipment in position Laid down 2100.0 ft of Tubing LD ball valve. Recovered 25 control line clamps & 2 bands. D1 Drill; OS-1:05 min. SCSSSV nipple assembly laid out Laid down Tubing of 200.0 ft Finish LD 194jts, cutoff, 13 GLM's, 1-SSSV, & 1 sliding sleeve. Fire Drill; OS-48 sec. Pull Single completion, 5-1/2in O.D. (cont...) Laid down 8350.0 ft of Tubing (cont...) Finish LD 194jts, cutoff, 13 GLM's, 1-SSSV, & 1 sliding sleeve. Fire Drill; OS-48 sec. Completed operations Facility PBS Pad Progress Report Well S- 1 lA Page 4 Rig Nabors 7ES Date 11 August 99 Date/Time 20 Nov 98 11:30-13:00 13:00 13:00-13:30 13:00-13:30 13:30 13:30-06:00 13:30-17:00 17:00 17:00-19:00 t9:00 19:00-19:30 19:30 19:30-03:00 03:00 03:00-04:00 04:00 04:00-05:30 05:30 05:30-06:00 06:00-14:30 06:00-12:30 12:30 12:30-14:30 14:30 14:30-20:00 14:30-16:00 16:00 16:00-16:30 16:30 16:30-20:00 20:00 20:00-20:30 20:00-20:30 20:30 20:30-06:00 20:30-01:00 21 Nov 98 01:00 01:00-03:00 Duration 1-1/2 hr 1/2 hr 1/2 hr 16-1/2 hr 3-1/2 hr 2 hr 1/2 hr 7-1/2 hr 1 hr 1-1/2 hr 1/2 hr 8-1/2 hr 6-1/2 hr 2 hr 5-1/2 hr 1-1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 9-1/2 hr 4-1/2 hr 2 hr Activity Rigged down Tubing handling equipment PTSM-PU BHA. Work completed, equipment laid out Wellhead work Installed Wear bushing Eqpt. work completed, running tool retrieved BHA run no. 1 Made up BHA no. 1 PU FTA # 1. BHA no. 1 made up Singled in drill pipe to 1300.0 ft D1 Drill; OS-1 min. Stopped: To service drilling equipment Serviced Top drive pipe handler Equipment work completed Singled in drill pipe to 8555.0 ft D1 Drill; OS-1 min. At Top of fish: 8555.0 ft Fished at 8562.0 ft Work 7' over TOF. Jar on fish f/30 min. Sheared SBR. Fish came free Circulated at 8583.0 ft Obtained bottoms up (100% annulus volume) Pulled out of hole to 7500.0 ft Spill Drill; OS-45 sec. D1 Drill; OS-45 sec. BHA run no. 1 (cont...) Pulled out of hole to 322.0 ft (cont...) Spill Drill; OS-45 sec. D1 Drill; OS-45 sec. At BHA Laid down fish LD Cut jt & SBR. Complete fish recovered BHA run no. 2 Made up BHA no. 2 Caliper SBR & dress overshot. BHA no. 2 made up Serviced Top drive pipe handler Equipment work completed R.I.H. to 3100.0 ft Top drive pipe handler failed - Change operation Repair Repaired Top drive pipe handler Repair bale clamps. Equipment work completed BHA run no. 2 R.I.H. to 8579.0 ft PU 2 singles. Up wt 190, SO 160, & Rot 175. H2S Drill; OS 2 min. At Top of fish: 8579.0 ft Fished at 8579.0 ft Latch fish. Attempt to release K-Anchor. Tried to rotate @ different pulls w/no success. Release fish. Monitor well & blow down. Progress Report Facility PBS Pad Well S- 1 lA Page 5 Rig Nabors 7ES Date 11 August 99 Date/Time 03:00 03:00-06:00 06:00-09:30 06:00-08:00 08:00 08:00-09:30 09:30 09:30-06:00 09:30-11:30 11:30 11:30-15:30 15:30 15:30-16:00 16:00 16:00-16:30 16:30 16:30-02:00 22 Nov 98 02:00 02:00-04:30 04:30 04:30-06:00 06:00-14:30 06:00-08:00 08:00 08:00-08:30 08:30 08:30-10:00 10:00 10:00-11:00 11:00 11:00-12:30 12:30 12:30-14:30 14:30 14:30-17:30 14:30-17:30 17:30 17:30-19:30 17:30-19:30 Duration 3 hr 3-1/2 hr 2 hr 1-1/2 hr 20-1/2 hr 2 hr 4 hr 1/2 hr 1/2 hr 9-1/2 hr 2-1/2 hr 1-1/2 hr 8-1/2 hr 2 hr 1/2 hr 1-1/2 hr 1 hr 1-1/2 hr 2 hr 3 hr 3 hr 2 hr 2 hr Activity Released fish Pulled out of hole to 5000.0 ft BHA run no. 2 (cont...) Pulled out of hole to 322.0 ft (cont...) At BHA Laid down fish Pull BHA. LD Slick Stick & K-Anchor. Complete fish recovered BHA run no. 3 Made up BHA no. 3 Strap fishing tools & MU BHA. BHA no. 3 made up R.I.H. to 8540.0 ft Fire Drill; OS-1 min. Stopped: To service drilling equipment Serviced Top drive pipe handler Equipment work completed Singled in drill pipe to 8599.0 ft 2 joints picked up Milled Permanent packer at 8609.0 ft Mill packer f/8599' to 8603'. Push down to 8609'. Work up 30'. Worked free. D2 Drill; OS-45 sec. Completed operations Circulated at 8609.0 ft Circ sweep. Monitor well. Blow down. Hole swept with slug - 150.00 % hole volume Pulled out of hole to 6000.0 ft D 1 Drill; OS- 1:30 min. Pull slow-packer dragging on occasion. BHA run no. 3 (cont...) Pulled out of hole to 5000.0 ft (cont...) D1 Drill; OS-1:30 min. Pull slow-packer dragging on occasion. Stopped: To service drilling equipment Serviced Top drive pipe handler Equipment work completed Pulled out of hole to 329.0 ft At BHA Pulled BHA Fish at surface Laid down fish LD packer & tailpipe assembly. Complete fish recovered Pulled BHA LD fishing tools. Clean boot baskets. BHA Laid out Slickline wireline work Conducted slickline operations on Slickline equipment - Tool run PJSM. RU slickline. RIH w/5.9" bell guide on overshot to 9018'. Attempt to latch fish. POH & RD slickline. Completed misrun with Overshot to 9018.0 ft BHA run no. 3 Pulled BHA LD 6.5" DC's. Progress Report Facility PBS Pad WellS-11A Page 6 Rig Nabors 7ES Date 11 August 99 Date/Time Duration Activity 23 Nov 98 19:30 19:30-06:00 19:30-23:00 23:00 23:00-02:00 02:00 02:00-03:00 03:00 03:00-04:45 04:45 04:45-06:00 04:45-06:00 06:00-15:00 06:00-06:15 06:15 06:15-07:00 07:00 07:00-13:00 13:00 13:00-15:00 15:00 15:00-06:00 15:00-17:00 17:00 17:00-18:00 18:00 18:00-18:30 18:30 18:30-00:30 24 Nov 98 00:30 00:30-03:00 10-1/2 hr 3-1/2 hr 3 hr 1 hr 1-3/4 hr 1-1/4 hr 1-1/4 hr 9 hr 1/4 hr 3/4 hr 6 hr 2 hr 15hr 2 hr 1 hr 1/2 hr 6 hr 2-1/2 hr BHA Laid out BHA run no. 4 Made up BHA no. 4 D 1 Drill; OS- 1 min. BHA no. 4 made up R.I.H. to 3000.0 ft Spill Drill; OS-i:10 min. Stopped: To service drilling equipment Serviced Block line Slip & cut 80' drlg line. D1 Drill; OS-1 Min. Line slipped and cut R.I.H. to 9017.0 ft At Top of fill: 9017.0 ft Fished at 9050.0 ft washed down to catch w/1 centralizer assy Fished at 9050.0 ft Drop ball f/reversing basket. Start washing down to catch WL centralizer assembly. BHA run no. 4 (cont...) Fished at 9068.0 ft (cont...) Drop ball f/reversing basket. Start washing down to catch WL centralizer assembly. Stopped: To circulate Circulated at 9068.0 ft Obtained bottoms up (100% annulus volume) Pulled out of hole to 855.0 ft At BHA Pulled BHA reverse basket plugged up w/thick crude, sand, metal shavings & pkr scraps, burning shoe was worn & scarred on outside btm 8", 1/d & recoverd 2 1/2 gals of junk, no fish recovery, clean & clear floor Completed operations BHA run no. 5 Made up BHA no. 5 pjsm, m/u 6 1/16" metal munchen 6 blade concaved mill, 2-boot basket, rih w/bha BHA no. 5 made up R.I.H. to 1600.0 ft Stopped: To service drilling equipment Serviced Top drive Equipment work completed R.I.H. to 9068.0 ft rih to 8627, install blower hose on top drive, cont. rih, d 2, 45sec On bottom · .J Milled Centraliser at 9169.0 ft mill f/9068--9090 w/6bpm 500psi, 3-5k wt on mill, 7000ftlbs torque; f/9090-9095 mill w/ 5-1 Ok, 7000-10,000ftlbs; f/9095-9169', drilled hard cmt w/5k on mill, 7000ftlbs torque, sweep hole w/high vis/density pill, small amount of u,vm, in returns Progress Report Facility PBS Pad Well S- 1 lA Page 7 Rig Nabors 7ES Date 11 August 99 Date/Time Duration Activity 03:00 03:00-06:00 03:00-06:00 06:00-14:30 06:00-07:00 07:00 07:00-07:30 07:30 07:30-08:00 08:00 08:00-11:00 11:00 11:00-12:00 12:00 12:00-12:30 12:30 12:30-14:30 14:30 14:30-21:30 14:30-17:00 17:00 17:00-21:30 21:30 21:30-04:30 21:30-04:30 25 Nov 98 04:30 04:30-06:00 3 hr 3 hr 8-1/2 hr 1 hr 1/2 hr 1/2 hr 3 hr 1 hr 1/2 hr 2 hr 7 hr 2-1/2 hr 4-1/2 hr 7 hr 7 hr 1-1/2 hr Completed operations Circulated at 9169.0 ft fin circ hole clean w/hi-vis/density sweeps, rig evacuation drill, 2mins Circulated at 9169.0 ft sweep hole w/serveral hi-vis/density pills, recoverd cmt cuttings & small amount of metal shavings in returns, circ hole clean BHA run no. 5 (cont...) Circulated at 9169.0 ft (cont...) sweep hole w/serveral hi-vis/density pills, recoverd cmt cuttings & small amount of metal shavings in returns, circ hole clean Obtained clean returns - 300.00 % hole volume Tested Casing - Via string pressure test 7" & 9 5/8" csg w/8.5ppg seawater to 4000psi for 10 rain, pressure recorder clock not working, AOGCC-Larry Wade waived witnessing test Rig equipment failed - Change operation Serviced Top drive Equipment work completed Pulled out of hole to 2260.0 ft Stopped: To service drilling equipment install storm pkr, c/o tbg hd, test Rigged up Handling equipment clean & clear floor, p/u halliburton tools to floor, slm, od, id, same Equipment work completed Held safety meeting ptsm w/rig personnel on expectations, policy's, regulations & operations Completed operations Set Retrievable packer at 40.0 ft with 1000.0 psi m/u rtts storm pkr, rih, set & tested, poh w/ running tool Packer set at 40.0 ft Nipple down BOP stack Rigged down Tubing head spool pull wear ring, n/d bop & tbg head Equipment work completed Rigged up Tubing head spool n/u tbg head, bope' s, test void & flange to 5000psi, spill drill, 70sec Equipment work completed Test well control equipment Tested BOP stack set test plug, test annular f/250-3500psi, test all rams, valves, lines to 250-5000psi, pull test plug, r/d test equip, install wear ring, defrost ice plug f/upper actuator valve on top drive, AOGCC-Larry Wade waived witnessing test Pressure test completed successfully - 5000.000 psi BHA run no. 5 Progress Report Facility PBS Pad Well S- 1 lA Page 8 Rig Nabors 7ES Date 11 August 99 Date/Time 04:30-06:00 06:00 06:00-09:30 06:00-06:30 06:30 06:30-07:30 07:30 07:30-09:30 09:30 09:30-06:00 09:30-12:00 12:00 12:00-12:30 12:30 12:30-15:00 15:00 15:00-01:00 19:00 26 Nov 98 01:00 O1:00-03:00 03:00 03:00-03:30 03:30 03:30-06:00 03:30-06:00 Duration 1-1/2 hr 3-1/2 hr 1/2 hr 1 hr 2hr 20-1/2 hr 2-1/2 hr 1/2 hr 2-1/2 hr 10hr 2 hr 1/2 hr 2-1/2 hr 2-1/2 hr Activity Pulled out of hole to 2260.0 ft r/u & poh, Vd rtts storm pkr, clear floor Stopped: To pressure test 7" & 9 5/8" csg BHA run no. 5 (cont...) Tested Casing - Via string 7" & 9 5/8" for 30 mins Pressure test completed successfully - 4000.000 psi Pulled out of hole to 860.0 ft w/4" dp At BHA Pulled BHA 1/d mill & junk basket, impression of 2" stem bar in center of mill face, recovered 2gal bucket of pieces of centralizer blades, metal shavings, sand & cmt cuttings, clear floor Completed operations BHA run no. 6 Made up BHA no. 6 p/u, m/u whipstock milling assy, 3 1/2" jt of hwtdp, bumber sub, mwd, orient same Stopped: To hold safety meeting Held safety meeting ptsm w/rig personnel on pre-planning & good communication Completed operations Made up BHA no. 6 rih w/bha BHA no. 6 made up R.I.H. to 9139.0 ft brk circ every 2000' at 5 3/4bpm, 700psi, no problems, rih On bottom Stopped: To take survey set toolface Set tool face establish p/u wt 185k, s/o wt 165k, pr 7.5bpm, pp 1200psi, orient whipstock, difficulty establishing good toolface w/seawater, circ visc seawater, established toolface at 21 deg left of highside Completed operations R.I.H. to 9159.0 ft tag, check toolface at 21 deg left of highside, set whipstock at 9138' dpm At Setting depth: 9138.0 ft top of whipstock Milled Casing at 9142.0 ft mill window f/9138-9142, 6 1/2bpm, 1075psi, torque 5600, rpm 95, instantaneous rop 3fph Milled Casing at 9142.0 ft mill window f/9142-9151', at 3fph w/6 1/2 bpm, 1150psi, pumped weighted sweeps as needed, recovered 77#' s of metal shavings; fire drill, 60sec Progress Report Facility PBS Pad Well S-11A Page 9 Rig Nabors 7ES Date 11 August 99 Date/Time 06:00-02:30 06:00-10:30 10:30 10:30-13:30 13:30 13:30-15:00 15:00 15:00-15:30 15:30 15:30-19:00 19:00 19:00-00:00 27 Nov 98 00:00 00:00-02:30 02:30 02:30-04:00 02:30-04:00 04:00 04:00-06:00 04:00-04:30 04:30 04:30-06:00 04:30-06:00 06:00-06:00 06:00-08:30 08:30 08:30-11:30 Duration 20-1/2 hr 4-1/2 hr 3 hr 1-1/2 hr 1/2 hr 3-1/2 hr 5 hr 2-1/2 hr 1-1/2 hr 1-1/2 hr 2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 24 hr 2-1/2 hr 3 hr Activity BHA run no. 6 (cont...) Milled Casing at 9151.0 ft (cont...) mill window f/9142-9151', at 3fph w/6 1/2 bpm, 1150psi, pumped weighted sweeps as needed, recovered 77#'s of metal shavings; fire drill, 60sec At Top of new hole section: 9151.0 ft Drilled to 9168.0 ft w/5.550" pilot milt f/9151-9168' at 3fph, 6 1/2bpm, 1150psi, fire drill, 6osec, recovered 77#' s of metal shavings, held ptsm w/rig personnel Reached planned end of run - Directional objective met Circulated at 9168.0 ft sweep hole w/weight pill, worked through window several times, no problems, monitor well Obtained clean returns - 150.00 % hole volume Pulled out of hole to 8627.0 ft Stopped: To circulate Circulated at 8627.0 ft circ & cond mud, sweep hole w/weighted pill, rotate & reciprocate pipe, circ 7" X 9 5/8" csg clean at 8.5bpm, 1500psi Obtained clean returns - 300.00 % hole volume Pulled out of hole to 907.0 ft monitor well, stable, pump dry job, poh, clean floor, held spill drill At BHA Pulled BHA 1/d milling assy, all the mils looked good, upper string mill in gauge at 6 1/16" od, clear floor BHA Laid out Planned maintenance Serviced Wear bushing pull wear bushing, flush stack, flowline, shakers, function bope' s, ok, set wear bushing Equipment work completed BHA run no. 7 Held safety meeting w/rig personnel on present ops-precautionary measure of concern, pinch points, top of whipstock, ppe Completed operations Made up BHA no. 7 m/u 2.60 mtr, bit, mwd w/gr-res, orient, rih, p/u bha Made up BHA no. 7 fin rih, p/u bha, function test pbl sub, surface test mwd, ok BHA run no. 7 (cont...) Made up BHA no. 7 (cont...) fin rih, p/u bha, function test pbl sub, surface test mwd, ok BHA no. 7 made up Singled in drill pipe to 3409.0 ft p/u, rabbit 4" dp Progress Report Facility PBS Pad Well S- 1 lA Page 10 Rig Nabors 7ES Date 11 August 99 Date/Time Duration Activity 11:30 11:30-15:00 15:00 15:00-15:30 15:30 15:30-16:30 16:30 16:30-17:00 17:00 17:00-04:30 28 Nov 98 04:30 04:30-06:00 06:00 06:00-08:00 06:00-08:00 08:00 08:00-12:30 08:00-12:30 12:30 12:30-17:30 12:30-16:00 16:00 16:00-17:00 17:00 17:00-17:30 17:30 17:30-02:00 17:30-21:00 21:00 21:00-22:00 22:00 22:00-02:00 29 Nov 98 02:00 3-1/2 hr 1/2 hr 1 hr 1/2 hr 11-1/2 hr 1-1/2 hr 2 hr 2 hr 4-1/2 hr 4-1/2 hr 5 hr 3-1/2 hr 1 hr 1/2 hr 8-1/2 hr 3-1/2hr 1 hr 4 hr 99 joints picked up R.I.H. to 8535.0 ft fill pipe every 30stds, held dl, 65sec Stopped: To hold safety meeting Held safety meeting ptsm-first day back, focus on job at hand, stay alert Completed operations R.I.H. to 9152.0 ft orient through top of window at 9138' 15deg left of highside, no problems, dl, 90sec Began precautionary measures Washed to 9168.0 ft wash f/9152-9168, 170k up wt, 145k dn wt Completed precautionary measures Drilled to 9377.0 ft directional drilled w/2.60deg mtr, mwd-gr-res f/ 9168-9377, ast 8.5hrs, wob 5-20k, 6-6 1/2bpm at 1625-2000 psi, lithology-ratty shale & sand Reached planned end of run - Directional objective met Circulated at 9377.0 ft circ hole clean Obtained bottoms up (100% annulus volume) BHA run no. 7 (cont...) R.I.H. to 5657.0 ft Brake failed - Change operation Brake cooling hose burst on drawworks-off driller's side Repair Repaired Brake service top drive while changing out brake cooling hoses on drawworks, spill drill-2min Equipment work completed BHA run no. 7 Pulled out of hole to 229.0 ft fin poh w/4" dp At BHA Pulled BHA std bk flex collars, Vd mtr Completed operations Downloaded MWD tool 1/d same Completed operations BHA run no. 8 Made up BHA no. 8 p/u 1.25 mtr, mwd-gr-res, orient, surface test w/o pdc bit, 85spm at 750psi, m/u bit, rih w/bha, fire drill-90sec BHA no. 8 made up Serviced Block line Line slipped and cut Singled in drill pipe to 3650.0 ft Brake failed - Change operation Facility PBS Pad Progress Report WellS-11A Page 11 Rig Nabors 7ES Date 11 August 99 Date/Time Duration Activity 02:00-03:00 02:00-03:00 03:00 03:00-06:00 03:00-06:00 03:00-06:00 06:00-18:00 06:00-06:30 06:30 06:30-07:00 07:00 07:00-07:30 07:30 07:30-11:00 11:00 11:00-16:30 16:30 16:30-17:00 17:00 17:00-18:00 18:00 18:00-06:00 18:00-19:00 19:00 19:00-19:30 19:30 19:30-00:15 30 Nov 98 00:15 00:15-06:00 1 hr 1 hr 3 hr 3 hr 3 hr 12 hr 1/2 hr 1/2 hr 1/2 hr 3-1/2 hr 5-1/2 hr 1/2 hr 1 hr 12hr 1 hr 1/2 hr 4-3/4 hr 5-3/4 hr Repair Repaired Brake c/o brake cooling hose on driller's side Equipment work completed BHA run no. 8 R.I.H. to 7514.0 ft rih w/bha on 4" dp R.I.H. to 7514.0 ft orient through top of liner at 8627', 30deg left of highside, tight hole BHA run no. 8 (cont...) R.I.H. to 9283.0 ft (cont...) orient through top of liner at 8627', 30deg left of highside, tight hole Began precautionary measures Washed to 9377.0 ft wash dn w/20spm at 700psi, tight hole intermittent f/9283-9377', work through serveral times w/& w/o pumps, ok Completed precautionary measures Took MWD survey at 9377.0 ft Attempt to obtain survey, receiving good pulse, G value on signal out of spec. M.W.D. tool failed - End BHA run Circulated at 9377.0 ft troubleshoot mwd, worked pipe, cycle, switch & regulate pumps, checked surface equipment, G value out of spec., troubleshoot w/Sperry field supervisor Ray French, no luck, mix & pump dry job, monitor well, stable Heavy slug spotted downhole Pulled out of hole to 232.0 ft no tight spots, monitor well at shoe, stable, continue poh, d 1-60sec At BHA Pulled BHA std bk flex collars, jars & check bit, ok BHA Stood back Downloaded MWD tool dn load & Vd slimphase 4-mwd Completed operations BHA run no. 9 Functioned M.W.D. tool m/u mwd-gr, initialize, orient Equipment work completed Made up BHA no. 9 rih w/bha, surface test mwd w/85spm at 1030psi, ok BHA no. 9 made up R.I.H. to 9287.0 ft no tight spots, d 1, 90sec Began precautionary measures Drilled to 9533.0 ft i..4..dttttl,u~wu tott .7.p I i-.7..).)j, O. Jt[ II.&., ClDL 4 Progress Report Facility PBS Pad WellS-11A Page 12 Rig Nabors 7ES Date 11 August 99 Date/Time 00:15-06:00 06:00-06:00 06:00-00:00 01 Dec 98 00:00 00:00-01:00 01:00 01:00-03:00 03:00 03:00-03:30 03:30 03:30-05:00 05:00 05:00-06:00 05:00-06:00 06:00-23:30 06:00-10:00 10:00 10:00-10:30 10:30 Duration 5-3/4 hr 24 hr 18hr 1 hr 2 hr 1/2 hr 1-1/2 hr 1 hr 1 hr 17-1/2 hr 4 hr 1/2 hr Activity rop slide-30fph, rop rot-50fph, lithology- sand, Drilled to 9533.0 ft w/1.25mtr, dgwd f/9533-10060, 6.5-7bpm, 2400psi,rop-20-150fph, lithology-mostly sand w/ traces of chert & shale, art 8 3/4, ast 1 1/4, started losing 2-3bph at 10036, lost 36% of returns at 10060', pumping at 7bpm 2400psi, fire & spill drills BHA run no. 9 (cont...) Drilled to 10060.0 ft (cont...) w/1.25mtr, dgwd f/9533-10060, 6.5-7bpm, 2400psi,rop-20-150fph, lithology-mostly sand w/ traces of chert & shale, art 8 3/4, ast 1 1/4, started losing 2-3bph at 10036, lost 36% of returns at 10060', pumping at 7bpm 2400psi, fire & spill drills Began precautionary measures Circulated at 0.0 ft circ over top of hole, keeping hole full while mixing 50bbl lcm pill for production interval at 100ppb, loses at 180bph static, lost 234bbls Began precautionary measures Circulated at 10427.0 ft dropped ball, open pbl sub at 10427', pump & displaced lcm pill out of dp, monitor well, losing 2bph 50.000 bbl LCM pill spotted downhole, LCM content 100.0 lb/bbl Pulled out of hole to 9567.0 ft w/5std's, lost 14bbls At top of check trip interval Circulated at 0.0 ft circ over top of hole keeping hole full, monitor well, 15 minute intervals- initial loss at 22bph, decreased to 12bph, same at 12bph, increased to 32bph, lost 30bbls Began precautionary measures Circulated at 0.0 ft circ over top of hole, monitoring hole while mixing 100bbl, 100ppb lcm pill for production interval Circulated at 0.0 ft circ over top of hole, keeping hole full while mixing 120bbl, 100ppb lcm pill, established loss rate of 60bph, drop ball, closed pbl sub, checked mwd for signal, lost 508bbls BHA run no. 9 (cont...) Circulated at 0.0 ft (cont...) circ over top of hole, keeping hole full while mixing 120bbl, 100ppb lcm pill, established loss rate of 60bph, drop ball, closed pbl sub, checked mwd for signal, lost 508bbls Dropped ball R.I.H. to 10060.0 ft dl-80sec On bottom Progress Report Facility PBS Pad Well S- 1 lA Page 13 Rig Nabors 7ES Date 11 August 99 Date/Time 10:30-11:30 11:30 11:30-12:30 12:30 12:30-12:45 12:45 12:45-14:00 14:00 14:00-14:30 14:30 14:30-16:30 16:30 16:30-22:00 22:00 22:00-23:30 23:30 23:30-00:30 23:30-00:30 02 Dec 98 00:30 00:30-05:30 00:30-05:30 05:30 05:30-06:00 05:30-06:00 05:30-06:00 06:00-15:00 06:00-07:00 Duration 1 hr 1 hr 1/4 hr 1-1/4 hr 1/2 hr 2 hr 5-1/2 hr 1-1/2 hr 1 hr 1 hr 5 hr 5 hr 1/2 hr 1/2 hr 1/2 hr 9 hr 1 hr Activity Drilled to 10098.0 ft attempt to survey before drlg, no luck, no gamma ray realtime, drld f/10060-10098', art 1/2, 6.5bpm, 2050-2450psi, rop 70-160', rpm 70,wob 7-10k,torg 3635-6000, survey at 10098' good, still no gamma ray realtime, lost 128 bbls Stopped · To circulate Circulated at 10098.0 ft circ at 6bpm, monitor hole, lost 35 bbls Obtained bottoms up (100% annulus volume) Pulled out of hole to 9940.0 ft Began precautionary measures Circulated at 9940.0 ft drop ball, open pbl at 9767', pump 120bbls, 100ppb lcm pill at 7bpm 650psi, displaced w/102bbls of seawater, lost 77bbls 120.000 bbl LCM pill spotted downhole, LCM content 100.0 lb/bbl Pulled out of hole to 9100.0 ft lost 24bbls At 7in casing shoe Rest hole at 9100.0 ft monitor well, initial losses at 60bbls, decreased to 30 bbls, lost 93 bbls, cleaning lcm f/pits Resumed operations Pulled out of hole to 235.0 ft w/4" dp, wet, dl-85sec At BHA Pulled BHA serv brk collars, Vd jars, pbl, mtr, bit, dn load mwd Completed operations BHA run no. 10 Made up BHA no. 10 p/u mtr, c/o stb blade, adj mtr to 1.50 degrees, m/u bit,, pulled probe, f/mwd, std bk, lost 94bbls Stopped · To test equipment Test well control equipment Tested BOP stack r/u to circ backside of well, while testing bope' s, pull wear ring, install test plug, test all valves, lines & rams f/250-5000psi, annular f/ 250-3500, install wear ring, blow dn choke & top dr notified state w/24 & 2 hr prior to test, no response Pressure test completed successfully - 5000.000 psi BHA run no. 10 Made up BHA no. 10 p/u, m/u bha, losses f/2400-present 269bbls Made up BHA no. 10 install mwd-gr probe, orient, initialize, rih, p/u 9es's pbl sub, new jars, surface hole test mwd, ok BHA run no. 10 (cont...) Made up BHA no. 10 (cont...) Progress Report Facility PBS Pad Well S- 1 lA Page 14 Rig Nabors 7ES Date 11 August 99 Date/Time 07:00 07:00-07:30 07:30 07:30-12:30 12:30 12:30-14:30 14:30 14:30-15:00 15:00 15:00-16:00 15:00-16:00 16:00 16:00-00:00 16:00-17:00 17:00 17:00-18:00 18:00 18:00-22:30 22:30 22:30-00:00 03 Dec 98 00:00 00:00-06:00 00:00-02:00 02:00 02:00-06:00 02:00-06:00 06:00-06:30 06:00-06:30 Duration 1/2 hr 5 hr 2 hr 1/2 hr 1 hr 1 hr 8 hr 1 hr 1 hr 4-1/2 hr 1-1/2 hr 6 hr 2 hr 4 hr 4 hr 1/2 hr 1/2 hr Activity 9es's pbl sub, new jars, surface hole test mwd, ok BHA no. 10 made up Serviced Top drive Equipment work completed R.I.H. to 9160.0 ft orient at liner top 8627', rih to btm of window, dl-80sec, lost 356 bbls f/0500-present At 7in casing shoe Washed to 10098.0 ft f/9160'-10098' at 4.5 bpm, 785psi, up wt 185k, s/o wt 145k, rot wt 170k, lost 185bbls On bottom Pulled out of hole to 9850.0 ft pulled wet on 1 st std, dry on the next two, lost 25bbls At top of check trip interval Cement · Lost circulation plug Circulated at 9850.0 ft m/u cmt hose, attempt to circ, pumped 2.9bbls, line pressured up 2000psi, checked surface equip, r/d cmt hose, circ thru same, r/u same, worked pipe, pressured up to 3500psi, surged back several times, working & rotating pipe, no luck, lost 55bbls Sub-surface equipment failed - Abort operation drillstring plugged BHA run no. 10 Pulled out of hole to 8550.0 ft wet, lost 55bbls Stopped · To circulate Circulated at 8550.0 ft circ w/restricted flow at 1/2 bpm 1850psi, plug in drillstring, blowdn top drive, lost 60bbls Broke circulation Pulled out of hole to 240.0 ft w/4' dp, wet, spill drill, 70sec, lost 535bbls At BHA Pulled BHA Vd pbl, std bk collars, pull mwd probe, 1/d bit, mtr; bit & bearing section of mtr plugged w/ walnut hull(lcm), lost 180bbls, losses at 90bph BHA Laid out BHA run no. 11 Made up BHA no. 11 p/u 1.25mtr, bit, mwd, orient, install probe(mwd-gr), rih w/bha, m/u new pbl, function test pbl, retrieved balls, fih, shallow test mwd, ok; lost 203bbls BHA no. 11 made up R.I.H. to 9100.0 ft lost 62bbls R.I.H. to 9100.0 ft orient at 7" liner top(8627'), dh, lost 324 BHA run no. 11 (cont...) R.I.H. to 9850.0 ft (cont...) . orient at 7" ': ...... fo~,,-,,), _:,. ,_~, -,~, A llll~'t LU.[-/I,.OU,~- / l. lll, IUDL Progress Report Facility PBS Pad WellS-11A Page 15 Rig Nabors 7ES Date 11 August 99 Date/Time Duration Activity 06:30 06:30-09:00 06:30-07:00 07:00 07:00-08:00 08:00 08:00-08:20 08:20 08:20-08:25 08:25 08:25-09:00 09:00 09:00-06:00 09:00-09:30 09:30 09:30-10:30 10:30 10:30-12:00 12:00 12:00-13:00 13:00 13:00-13:30 13:30 13:30-21:00 2-1/2 hr 1/2 hr 1 hr 1/4 hr 0 hr 1/2 hr 21hr 1/2 hr 1 hr 1-1/2 hr 1 hr 1/2 hr 7-1/2 hr Stopped: To circulate Cement: Lost circulation plug Circulated at 9850.0 ft established loss rate pumping 5bpm, 1340psi at 87bph, flu, pump thru secondary kill line Broke circulation Batch mixed slurry - 20.000 bbl held safety mtg w/invovled personnel on safety, environmental & operational procedures for cmt job while circ, keeping hole full Batch slurry mixed Pumped Diesel spacers - volume 50.000 bbl pump 5bbls mineral oil(mo), test lines 3500psi, 5bbls mo, 40bbls diesel at 4bpm, 850-1250psi Required volume of spacer pumped Mixed and pumped slurry - 20.000 bbl flexplug slurry at 4 bpm 1450-1400psi Cement pumped FLEXPLUG not cement Displaced slurry - 99.000 bbl w/10bbls of mineral oil, 17 bbls of diesel, closed hydril, pumping down annulus 4bpm 550psi at a 1:1 ratio, 13bbls of diesel, 4bpm 1200-1650psi, 59bbls of seawater, 3-1 bpm 1650-1200psi, annulus psi 550-650, plug in place at 09:03hrs, 12/3/98 Slurry at required depth, stopped the displacement lost 218bbls BHA run no. 11 Pulled out of hole to 9383.0 ft w/5std's, lost 25bbls At top of check trip interval Circulated at 9383.0 ft waiting on flexplug, no losses Obtained bottoms up (100% annulus volume) Washed to 10098.0 ft monitor well, stable, wash f/9383-10098', no losses On bottom Circulated at 10098.0 ft circ at reduce rate due to flexplug material blanking off shaker screen, downsized to larger screens to handle returns Obtained clean returns - 100.00 % hole volume Drilled to 10106.0 fi drld f/10098~10106', ast 1/4hr, started losing fluid at 60bph at 10100, lost returns at 10106 Began precautionary measures Circulated at 10087.0 ft filling backside, keeping hole full at 200bph, monitor backside w/losses at 20-150bph, dp at 60-200bph loss rate while r/u lines f/S-34i produce water injector for water to pits & annulus, lost 960bbls --'- Progress Report Facility PBS Pad Well S-11A Page 16 Rig Nabors 7ES Date 11 August 99 Date/Time 21:00 21:00-21:30 21:30 21:30-06:00 21:30-06:00 04 Dec 98 06:00-14:30 06:00-13:30 13:30 13:30-14:30 14:30 14:30-16:30 14:30-15:30 15:30 15:30-16:30 16:30 16:30-17:30 16:30-17:30 17:30 17:30-18:30 17:30-17:50 17:50 17:50-18:00 Duration 1/2 hr 8-1/2 hr 8-1/2 hr 8-1/2 hr 7-1/2 hr 1 hr 2 hr 1 hr 1 hr 1 hr 1 hr 1 hr 1/4 hr 0 hr Activity Stopped: To hold safety meeting Held safety meeting w/all involved personnel on plan forward, S-34i well tie-in for produced water, spill awareness, well control, rig evacuation & drlg ahead w/ severe losses Completed operations Drilled to 10599.0 ft w/1.25 adj mtr, mwd-gr f/10599-11050, erratic torgue while drlg f/10735-10776 w/ 5000-14000ftlbs, worked through several times, loss at +/-800bph, lost 2690 '--, Drilled to 10599.0 ft drld w/1.25 fix mtr, mwd-gr f/10106-10599, 7bpm,1700psi, rop 200fph, keeping backside full + dp losing +/-900bph, art 2hrs, asr lhr, estimated losses while drilling 5880bbls BHA run no. 11 (cont...) Drilled to 11050.0 ft (cont...) drld w/1.25 fix mtr, mwd-gr f/10106-10599, 7bpm, 1700psi, rop 200fph, keeping backside full + dp losing +/-900bph, art 2hrs, asr lhr, estimated losses while drilling 5880bbls Reached planned end of run - Geological Pulled out of hole to 9850.0 ft monitor well, keeping full on backside, losses at 600bph, static, poh, tight spot at 10280' w/25k overpull, worked through, ok At top of check trip interval Cement: Lost circulation plug Circulated at 9850.0 ft establish loss rate pumping 5bpm at 1350psi dn the dp & 8.8bpm on backside at +/-800bph Broke circulation Batch mixed slurry - 50.000 bbl held safety mtg w/involved personnel on safety, environment & operations for cmt job while circ & reciprocating pipe, taking weight at 9840, unable to work past, slurry batched mixed Began precautionary measures BHA run no. 11 Washed to 9850.0 ft r/d cmt hd, m/u top drive, wash, rotate & work through ledge at 9840', continued washing to 9942, poh w/1 std, position bit at 9850', r/d top drive, r/u cmt hd Completed precautionary measures Cement: Lost circulation plug Pumped Diesel spacers - volume 50.000 bbl pimp 5bbls mineral oil(mo), test lines3500psi, 5bbls mo, 40bbls diesel at 4-5.5bpm, 700-1800psi Required volume of spacer pumped Mixed and pumped slurry - 50.000 bbl flexplug at 5.5-3bpm, 1800-500psi Facility PBS Pad Date/Time 18:00 18:00-18:30 18:30 18:30-00:00 18:30-19:00 19:00 19:00-00:00 05 Dec 98 00:00 00:00-06:00 00:00-06:00 00:00-06:00 06:00-13:30 06:00-07:30 07:30 07:30-09:00 09:00 09:00-09:30 09:30 09:30-12:30 12:30 12:30-13:30 Progress Report WellS-11A Page 17 Rig Nabors 7ES Date 11 August 99 Duration 1/2 hr 5-1/2 hr 1/2 hr 5 hr 6 hr 6 hr 6 hr 7-1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 3 hr 1 hr Activity Cement pumped FLEXPLUG not cement Displaced slurry - 70.000 bbl w/10bbls mineral oil, closed hydrill, simultaneously pump dn annulus 3-3/4bpm 38-710psi at al:l ratio, 30bbls diesel, 3bpm, 500psi; 40bbls seawater, 3-3/4bpm, 500-3500psi, bled off pressure, attempt to circ, pipe plugged, attempt to poh, stuck at 9850 Aborted attempts to obtain screen out left 18bbls of flexplug + 10bbls mineral oil + 30bbls diesel + 40bbls seawater BHA mn no. 11 Circulated at 9850.0 ft bled dn annulus & dp, open hydrill, attempt to circ through dp, pressure up to 3500psi, release pressure, attempt to poh, pipe stuck Began precautionary measures Worked stuck pipe at 9850.0 ft attempt to free pipe down, no jar action, torqued up to 10000ftlbs, working torque dn, s/o to 45k, attempt several times, work pipe up f/325-475k, several times w/, w/o dp pressure, no luck Aborted attempts to work Drillpipe free at 9850.0 ft Stuck Drillpipe 4in Conducted electric cable operations r/u schl equipment & tools, baker atlas lubricator w/tiw, side door sub, swivel, m/u free point tool, rih Conducted electric cable operations rih w/freePoint, set dn at 8650'w/1, freepoint at 8620', tooljoints at 8583', 8552', 8522', poh, Vd tools Stuck 4in Drillpipe (cont...) Conducted electric cable operations (cont...) rih w/freepoint, set dn at 8650'w/1, freepoint at 8620', tooljoints at 8583', 8552', 8522', poh, 1/d tools Found free point in drill string at 8620.0 ft Conducted electric cable operations m/u string shot, rih to 8522', pjsm w/crews Stopped to work torque into string Worked stuck pipe at 8522.0 ft work 6 1/2 rounds of reverse torque in 4" dp, dl-85sec Required torque worked into string Conducted electric cable operations ran strip log, position string shot across connections, fired string shot, clear indication of b/o, poh, r/d w/l, baker atlas equipment, cleared floor, ptsm w/c/o crew on skate ops. Fired string shot, accomplished back off at 8522.0 ft Reverse circulated at 8520.0 ft fin b/o w/3 tums to the left, rev circ at 8520', recovered diesel & n~fincral ff-~-,t,~,~ '~ .... '"-'-~,~L .~:-~,},,~- Facility PBS Pad Progress Report Well S- 1 lA Page 18 Rig Nabors 7ES Date 11 August 99 Date/Time 13:30 13:30-20:30 13:30-14:00 14:00 14:00-15:30 15:30 15:30-20:30 20:30 20:30-06:00 20:30-01:00 06 Dec 98 01:00 01:00-04:00 04:00 04:00-05:00 05:00 05:00-06:00 05:00-06:00 06:00-11:30 06:00-11:30 11:30 11:30-21:30 11:30-18:30 18:30 18:30-19:00 19:00 19:00-21:30 Duration 7 hr 1/2 hr 1-1/2 hr 5 hr 9-1/2 hr 4-1/2 hr 3 hr 1 hr 1 hr 1 hr 5-1/2 hr 5-1/2 hr lOhr 7 hr 1/2 hr 2-1/2 hr Activity up wt 165k String displaced with Seawater - 100.00 % displaced BHA run no. 11 Pulled out of hole to 8425.0 ft b/o, 1/d tiw & x-o's Stopped: To splice cable Serviced Block line Line slipped and cut 160' Pulled out of hole to 0.0 ft 1/d shot jt, slm, no correction, hole taking 10bph, top of fish at 8522', btm of fish at 9850', dl-85 Reached string failure point - length missing 1328.0 ft BHA run no. 12 Made up BHA no. 12 p/u, strap & caliper tools, fih w/cut lip pin on 4" jr, x-o, bumper sub, oil jar, 9-dc's, acc. jar, 24jts of 5" hwdp, x-o BHA no. 12 made up R.I.H. to 8522.0 ft w/bha on 4" dp At Top of fish: 8522.0 ft Worked toolstring at 8522.0 ft held pjsm w/involved personnel on safety, environmental & operational concerns, screwed into fish, torqued pipe w/22000ftlbs Required torque worked into string Fished at 8522.0 ft jarring dn on fish Fished at 8522.0 ft jar dn on fish for 1 hr, worked 14000ftlbs of righthand torque into string, stacked out wt, 1 hr; jarred up at 400k, increased pull to 475k several times, no move BHA run no. 12 (cont...) Fished at 8522.0 ft (cont...) jar dn on fish for 1 hr, worked 14000ftlbs of righthand torque into string, stacked out wt, 1 hr; jarred up at 400k, increased pull to 475k several times, no move Aborted attempts to latch no move, did not jar free Electric wireline work Conducted electric cable operations r/u apr equipment, pjsm w/involved personnel, p/u backoff tools, r/u schlumberger, rehead line, r/u string shot, rih w/w/l to 8571', d 1-60sec Stopped to work torque into string Worked stuck pipe at 8522.0 ft work 7 rounds of reverse torque dn 4" dp Required torque worked into string Conducted electric cable operations ran strip log, position string shot across connection, shot fired, clear indication at surface of b/o, poh, r/d w/1 & tools, cleared floor Progress Report Facility PBS Pad WellS-11A Page 19 Rig Nabors 7ES Date 11 August 99 Date/Time 21:30 21:30-05:00 21 '30-02:30 07 Dec 98 02:30 02:30-04:00 04:00 04:00-05:00 05:00 05:00-06:00 05:00-06:00 06:00 06:00-14:30 06:00-06:30 06:30 06:30-10:00 10:00 10:00-10:30 10:30 10:30-11:30 11:30 11:30-13:30 13:30 13:30-14:30 14:30 14:30-17:30 14:30-17:30 17:30 17:30-03:15 17:30-19:00 19:00 19:00-19:30 19:30 19:30-20:30 20:30 20:30-21:30 21:30 21:30-00:45 Duration 7-1/2 hr 5 hr 1-1/2 hr 1 hr 1 hr 1 hr 8-1/2 hr 1/2 hr 3-1/2 hr 1/2 hr 1 hr 2 hr 1 hr 3 hr 3 hr 9-3/4 hr 1-1/2 hr 1/2 hr 1 hr 1 hr 3-1/4 hr Activity Fired string shot, accomplished back off at 8522.0 ft BHA run no. 12 Pulled out of hole to 1054.0 ft w/4"dp, dl-70sec, spill drill-58sec At B HA Pulled BHA std bk, hwt, dc's, 1/d acc. jars, jar, bumper sub, 4" cut lip jt Completed operations Serviced Kelly cocks cleared floor, c/o lower kelly cock due to bad threads Equipment work completed BHA run no. 13 Rigged up Tubing handling equipment r/u tbg tongs, slips & elevators, intermittent losses to hole at 4bph Equipment work completed BHA run no. 13 (cont...) Rigged up Tubing handling equipment Finish RU 2 1/16" tools. Work completed - Tubing handling equipment in position Singled in drill pipe to 1208.0 ft RIH w/guide on 2 1/16" tbg. 40 joints picked up Circulated at 1208.0 ft Circ tbg clean. D1 Drill; OS-i:10 min. String displaced with Seawater - 120.00 % displaced Rigged down Tubing handling equipment Work completed, equipment laid out Made up BHA no. 13 PU bumper sub &jars. RIH on DC's. Spill Drill; OS- 50 sec. BHA no. 13 made up R.I.H. to 3400.0 ft Electromagnetic brake failed - Change operation Repair Repaired Electromagnetic brake Replace shifting ring on Elmago brake. Equipment work completed BHA run no. 13 R.I.H. to 8522.0 ft At Top of fish · 8522.0 ft Worked toolstring at 8522.0 ft Establish wts& circ pressures. Work into top of fish. Completed operations Washed to 8750.0 ft Wash fill f/8650'-8750'. Stopped · To circulate Circulated at 8750.0 ft CBU @ 7 bpm w/2150 psi. Obtained bottoms up (100% annulus volume) Washed to 9515.0 ft Progress Report Facility PBS Pad Well S- 1 lA Page 21 Rig Nabors 7ES Date 11 August 99 Date/Time Duration Activity 09 Dec 98 23:30 23:30-01:00 01:00 01:00-02:00 02:00 02:00-04:00 04:00 04:00-04:30 04:30 04:30-06:00 04:30-06:00 06:00 06:00-11:30 06:00-07:30 07:30 07:30-08:30 08:30 08:30-10:30 10:30 10:30-11:30 11:30 11:30-22:30 11:30-12:30 12:30 12:30-14:30 14:30 14:30-16:00 16:00 16:00-17:00 17:00 17:00-18:00 18:00 18:00-18:30 18:30 18:30-19:00 19:00 19:00-20:30 1-1/2 hr lhr 2 hr 1/2 hr 1-1/2 hr 1-1/2 hr 5-1/2 hr 1-1/2 hr 1 hr 2 hr 1 hr llhr 1 hr 2 hr 1-1/2 hr 1 hr 1 hr 1/2 hr 1/2 hr 1-1/2 hr At BHA Pulled BHA BHA Stood back Rigged up Tubing handling equipment RU 2 1/16" tools. Work completed - Tubing handling equipment in position Laid down 1207.0 ft of 2-1/16in OD drill pipe LD tubing stinger. 40 joints laid out Rigged down Tubing handling equipment Work completed, equipment laid out BHA run no. 14 Made up BHA no. 14 BHA no. 14 made up BHA run no. 14 (cont...) R.I.H. to 4100.0 ft Start RIH w/screwin assembly. Stopped: To service drilling equipment Serviced Block line Slip & cut 80'. Line slipped and cut R.I.H. to 8522.0 ft D1 Drill; OS-1 min. At Top of fish: 8522.0 ft Fished at 8522.0 ft Screw into fish. Work in right hand torque. Attempt to circulate-No go. Latched fish Electric wireline work Rigged up Rigging equipment RU WL enty sub & swivel. Work completed - Rigging equipment in position Rigged up Logging/braided cable equipment PJSM w/SWS. RU SWS. Rehead cable. PU freepoint tools. Work completed - Logging/braided cable equipment in position R.I.H. to 9328.0 ft Could not get tools below 9328'. Stopped: To take survey Conducted electric cable operations Establish freepoint @ 9328'. Closest connection @ 9297'. Spill Drill;.OS-1:20 min. Found free point in drill string at 9297.0 ft Pulled out of hole to 0.0 ft LD freepoint tools. At Surface: 0.0 ft Installed Fishing tools MU 300 grain stringshot. Equipment work completed R.I.H. to 9297.0 ft Stopped: To correlate depth Conducted electric cable operations Work left hand torque down string. Progress Report Facility PBS Pad Well S-1 lA Page 22 Rig Nabors 7ES Date 11 August 99 Date/Time 10 Dec 98 20:30 20:30-21:30 21:30 21:30-22:30 22:30 22:30-06:00 22:30-23:30 23:30 23:30-03:00 03:00 03:00-05:00 05:00 05:00-06:00 06:00 06:00-06:45 06:00-06:30 06:30 06:30-06:45 06:45 06:45-10:00 06:45-10:00 10:00 10:00-10:30 10:00-10:15 10:15 10:15-10:30 10:30 10:30-20:00 10:30-11:30 11:30 11:30-14:30 14:30 14:30-15:00 15:00 15:00-19:30 19:30 19:30-20:00 20:00 20:00-22:45 20:00-21:00 21:00 21:00-22:00 22:00 22:00-22:30 Duration 1 hr 1 hr 7-1/2 hr 1 hr 3-1/2 hr 2 hr 1 hr 3/4 hr 1/2 hr 1/4 hr 3-1/4hr 3-1/4 hr 1/2 hr 1/4hr 1/4 hr 9-1/2 hr 1 hr 3 hr 1/2 hr 4-1/2 hr 1/2 hr 2-3/4 hr 1 hr 1 hr 1/2 hr Activity Fired string shot, accomplished back off at 9297.0 ft Pulled out of hole to 0.0 ft At Surface: 0.0 ft Rigged down Rigging equipment RD entry sub & swivel. Work completed, equipment laid out BHA run no. 14 Circulated at 9297.0 ft Obtained bottoms up (100% annulus volume) Pulled out of hole to 1829.0 ft Blow down top drive. D1 Drill; OS-1:30 min. At BHA Pulled BHA BHA Laid out Laid down fish LD 25 jts 4"DP. Top of remaining fish @ 9297'. Partial fish recovered Wellhead work Removed Wear bushing Equipment work completed Installed BOP test plug assembly Equipment work completed Test well control equipment Tested BOP stack Test BOPE to 250/5000 psi; annular to 250/3500 psi. Witnessing waived by Lou Grimaldi-AOGCC Field Inspector. Pressure test completed successfully - 5000.000 psi Wellhead work Removed BOP test plug assembly Equipment work completed Installed Wear bushing Eqpt. work completed, running tool retrieved BHA run no. 15 Rigged up Tubing handling equipment Work completed - Tubing handling equiPment in position Singled in drill pipe to 1022.0 ft PU mule shoe. PU 32 jts 2 3/8" PH6 tubing. 32 joints picked up Rigged down Tubing handling equipment Work completed, equipment laid out R.I.H. to 9150.0 ft MU plug catcher. RIH w/cement stinger on 4" HT. Fire Drill; OS-55 sec. Stopped: To circulate Washed to 9297.0 ft At Top of fish: 9297.0 ft Cement: Abandonment plug Circulated at 9275.0 ft Obtained clean returns ~ 150.00 % hole volume Batch mixed slurry - 17.000 bbl PJSM w/HOWCO. Batch slurry mixed Mixed and pumped slurry - 17.000 bbl Progress Report Facility PBS Pad Well S- 1 lA Page 23 Rig Nabors 7ES Date 11 August 99 Date/Time 11 Dec 98 12 Dec 98 22:30 22:30-22:45 22:45 22:45-23:30 22:45-23:30 23:30 23:30-06:00 23:30-00:00 00:00 00:00-06:00 00:00-06:00 06:00-11:30 06:00-11:30 11:30 11:30-23:00 11:30-14:30 14:30 14:30-16:30 16:30 16:30-18:30 18:30 18:30-19:00 19:00 19:00-22:30 22:30 22:30-23:00 23:00 23:00-04:00 23:00-02:30 02:30 02:30-03:30 03:30 03:30-04:00 04:00 04:00-05:15 04:00-04:30 04:30 04:30-05:00 05:00 05:00-05:15 Duration 1/4 hr 3/4 hr 3/4 hr 6-1/2 hr 1/2 hr 6 hr 6 hr 5-1/2 hr 5-1/2 hr 11-1/2 hr 3 hr 2 hr 2 hr 1/2 hr 3-1/2 hr 1/2 hr 5 hr 3-1/2 hr 1 hr 1/2 hr 1-1/4 hr 1/2 hr 1/2 hr 1/4 hr Activity Cement pumped Displaced slurry - 82.000 bbl Slurry at required depth, stopped the displacement BHA run no. 15 Pulled out of hole to 8340.0 ft Pull 10 stds. Stopped: To circulate Cement: Abandonment plug Circulated at 8340.0 ft Load DP wiper plug. Circ down @ 7 bpm & 1800 psi. Plug catcher sheared @ 2550 psi. Ball seated in Other sub-surface equipment Wait on cement Circ while WOC. Wait on cement Spill Drill; OS-50 sec. Cement: Abandonment plug (cont...) Wait on cement (cont...) Spill Drill; OS-50 sec. Resumed operations BHA run no. 15 Washed to 9297.0 ft Saw a few light stringers of hard cement. At Top of fish: 9297.0 ft Circulated at 9297.0 ft Obtained clean returns - 150.00 % hole volume Pulled out of hole to 7150.0 ft Blow down top drive. Stopped: To service drilling equipment Serviced Top drive pipe handler Equipment work completed Pulled out of hole to 1029.0 ft D1 Drill; OS-1 min. At BHA Pulled BHA LD plug catcher & one XO. BHA Laid out BHA run no. 16 R.I.H. to 9297.0 ft Wash 90' to bottom. At Top of fish: 9297.0 ft Circulated at 9297.0 ft Obtained bottoms up (100% annulus volume) Held safety meeting PJSM w/HOWCO. Completed operations Cement :Abandonment plug Batch mixed slurry - 30.000 bbl Batch 150 sxs Premium 'G' @ 15.8 ppg. Batch slurry mixed Mixed and pumped slurry - 30.000 bbl Cement pumped Displaced slurry - 80.000 bbl Progress Report Facility PBS Pad Well S- 1 lA Page 24 Rig Nabors 7ES Date 11 August 99 Date/Time 13 Dec 98 05:15 05:15-05:45 05:15-05:45 05:45 05:45-06:00 05:45-06:00 06:00-18:00 06:00-07:30 07:30 07:30-18:00 18:00 18:00-20:00 18:00-19:30 19:30 19:30-20:00 20:00 20:00-21:00 20:00-21:00 21:00 21:00-06:00 21:00-04:00 04:00 04:00-04:45 04:45 04:45-05:45 05:45 05:45-06:00 06:00-08:00 06:00-06:45 06:45 06:45-08:00 08:00 08:00-13:00 08:00-13:00 13:00 13:00-14:30 13:00-14:00 14:00 14:00-14:30 14:30 14:30-17:30 14:30-15:00 15:00 Duration 1/2 hr 1/2 hr 1/4 hr 1/4 hr 12hr 1-1/2 hr 10-1/2 hr 2 hr 1-1/2 hr 1/2 hr 1 hr 1 hr 9 hr 7 hr 3/4 hr 1 hr 1/4hr 2 hr 3/4 hr 1-1/4 hr 5 hr 5 hr 1-1/2 hr 1 hr 1/2 hr 3 hr 1/2 hr Activity Slurry at required depth, stopped the displacement BHA run no. 16 Pulled out of hole to 8130.0 ft Pull 12 stds. Stopped: To circulate Cement: Abandonment plug Circulated at 8130.0 ft Finish CBU after plug job. H2S Drill; OS-55 sec. Cement: Abandonment plug (cont...) Circulated at 8130.0 ft (cont...) Finish CBU after plug job. H2S Drill; OS-55 sec. Obtained bottoms up (100% annulus volume) Wait on cement Circ @ 2.5 bpm while WOC. Fire Drill; OS-1 min. Resumed operations BHA run no. 16 Washed to 8528.0 ft Tagged hard cement. At Top of cement: 8528.0 ft Pulled out of hole to 8152.0 ft Stopped: To pressure test Cement: Abandonment plug Tested Casing Tested cement plug & 9 5/8" casing. Pressure test completed successfully - 3000.000 psi BHA run no. 16 Laid down 7130.0 ft of 4in OD drill pipe D1 Drill; OS-1:20 min. At BHA Rigged up Tubing handling equipment Equipment work completed Pulled BHA LD 2 3/8" tbg. BHA Laid out Rigged down Tubing handling equipment BHA run no. 16 (cont...) R.I.H. to 3550.0 ft Run stands out of derrick. Stopped: To pick up/lay out tubulars Laid down 1350.0 ft of 4in OD drill pipe Stopped: To circulate Fluid system Freeze protect well - 160.000 bbl of Diesel Freeze protect to 2200'. Had problems pumping cold diesel. Completed operations BHA run no. 16 Laid down 2200.0 ft of 4in OD drill pipe At Surface: 0.0 ft Rigged down Drillstring handling equipment Work completed, equipment laid out Wellhead work Rigged down Wear bushing Work completed, equipment laid out Progress Report Facility PBS Pad W ell S- 11A Rig Nabors 7ES Page 25 Date 11 August 99 Date/Time 14 Dec 98 15:00-17:00 17:00 17:00-17:30 17:30 17:30-20:30 17:30-20:30 20:30 20:30-06:00 20:30-22:00 22:00 22:00-23:30 23:30 23:30-00:01 00:01 Duration 2 hr 1/2 hr 3 hr 3 hr 9-1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr Activity Installed Tubing hanger Run tbg hanger w/1 jt 4.5" tbg. Set TWC. Equipment work completed, seal energised Tested Tubing hanger Test TWC to 1000 psi from below. Test hanger. Pressure test completed successfully - 5000.000 psi Nipple down BOP stack Rigged down BOP stack Equipment work completed Wellhead work Installed Adapter spool NU adapter flange. H2S Drill; OS- 1:10 min. Equipment work completed Installed Xmas tree Equipment work completed Tested Xmas tree Test tree & adapter flange. Pressure test completed successfully - 5000.000 psi Rig released @ 0001 on 12/14/98. Progress Report Facility PBS Pad Well S- 1 lA Page 20 Rig Nabors 7ES Date 11 August 99 Date/Time 08 Dec 98 00:45 00:45-03:00 03:00 03:00-03:15 03:15 03:15-06:00 03:15-06:00 03:15-06:00 06:00-08:00 06:00-08:00 08:00 08:00-04:30 08:00-11:30 11:30 11:30-12:00 12:00 12:00-12:30 12:30 12:30-13:00 13:00 13:00-14:30 14:30 14:30-15:30 15:30 15:30-17:00 17:00 17:00-20:00 20:00 20:00-23:30 Duration 2-1/4 hr 1/4 hr 2-3/4 hr 2-3/4 hr 2-3/4 hr 2 hr 2 hr 20-1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 1/2 hr 1-1/2hr 1 hr 1-1/2 hr 3 hr 3-1/2 hr Activity scatter any flexplug up into 9 5/8". Had Low Level Operation stopped due to Incident Held safety meeting Secured well and evacuated to rig camp. Secured S-Pad. Made WOA and Anchorage notifications. Met w/ERT members and agreed to a plan forward. ERT members accompanied rig team members, all with supplied air, to check H2S levels on the rig. Began precautionary measures Held safety meeting Found zero H2S readings in all rig areas. Given OK by ERT for crew to reenter rig. Completed operations Fluid system Fill pits with Inhibited brine Finish RU hardline w/flowmeter & check valve. WO inhibited brine. Fill pits with Inhibited brine Blow down top drive and mud line. Add ZnCO3 to fluid in pits. Rig hard line to take returns to S-35 flowline. WO 900 bbls inhibited seawater from mud plant. Fluid system (cont...) Fill pits with Inhibited brine (cont...) Blow down top drive and mud line. Add ZnCO3 to fluid in pits. Rig hard line to take returns to S-35 flowline. WO 900 bbls inhibited seawater from mud plant. Completed operations BHA run no. 13 Circulated at 9515.0 ft Circ @ 5 bpm w/1850 psi DP & 350 psi annulus. Hole displaced with Inhibited brine - 150.00 % displaced Flow check DP & Csg pressures-0 psi. Open well. Observed well static Cleared Chicksan lines PTSM. Blow down hardlines. Equipment work completed Washed to 9612.0 ft Washed to top of jars. At Top of fill · 9612.0 ft Circulated at 9612.0 ft Circ @ 6.5 bpm w/2350 psi. Hole swept with slug - 120.00 % hole volume Pulled out of hole to 8522.0 ft Check torque on all connections. At Top of fish · 8522.0 ft Circulated at 8522.0 ft Circ sweep @ 7.5 bpm w/1700 psi. Hole swept with slug - 150.00 % hole volume Pulled out of hole to 5200.0 ft Check torque on all connections. Stopped · To pick up/lay out tubulars Laid down 2950.0 ft of 4in OD drill pipe TT,~IC~ 1'~,~'11. J""~CTM I ."')/'~ ~:~ llZ~O L/lilt, UO-I .,,.~U IlLIII. Facility PBS Pad Progress Report Well S- 11B Rig Nabors 9ES Page · Date 1 11 August 99 Date/Time 13 Jul 99 14 Jul 99 22:30-06:00 22:30-06:00 06:00 06:00-06:00 06:00-06:00 Duration 7-1/2 hr 7-1/2 hr 24 hr 24 hr Activity Move rig Rigged down Top drive Prep rig for move from A-Pad to S-Pad. PJSM. Remove stairs, landings, beaver slide, etc. RD floor, remove drawworks guards. Pull pit module away from rig. Release from top drive and secure same. Rig 0.0% moved. Equipment work completed Move rig Rig moved 10.00 % Move rig off A-Pad and down access road. Approaching 1/2 way point to Spine Road. Soft road conditions requiring plywood on both sides of road. Five loaders running. All hands PU/LD plywood. Cycling plywood around rig via D-Pad access road. 15 Jul 99 16 Jul 99 17 Jul 99 18 Jul 99 06:00-06:00 06:00-18:00 18:00 18:00-23:00 23:00 23:00-06:00 06:00 06:00-06:00 06:00-06:00 06:00 06:00-06:00 06:00-06:00 06:00 06:00-06:00 24 hr 12 hr 5 hr 7 hr 24 hr 24 hr 24 hr 24 hr 24 hr Move rig Rig moved 10.00 % Finish L/D plywood on both sides of A-Pad access road and move sub base module to Spine Road. Rig off station Rig moved 10.00 % Move sub base module down Spine Road to CC2A parking area while being escorted by Security. No moving problems. Rig off station Rig moved 10.00 % L/D plywood with matting boards on the top of the plywood on both sides of the first of two Kuparuk River bridges. Estimated time to finish L/D plywood and matting boards is 0800 hrs. Rig off station Move rig (cont...) Rig moved 40.00 % L/D plywood and matting boards at 1st Kuparuk river crossing. Move sub base and pit modules across river. P/U matting boards and L/D at 3rd Kuparuk river crossing. Rig off station Move rig (cont...) Rig moved 60.00 % Begin moving sub base down Spine road towards S-Pad road. Broke thru road 1/2 mile from S-Pad road. Crib tires. Free after serveral attempts. Move sub base to S-Pad road. Start L/D plywood and matting boards on S-Pad road. Rig off station Move rig (cont...) Progress Report Facility PBS Pad Well S- 1 lB Page 2 Rig Nabors 9ES Date 11 August 99 Date/Time 19 Jul 99 20 Jul 99 06:00-06:00 06:00 06:00-19:00 06:00-19:00 19:00 19:00-06:00 19:00-23:30 23:30 23:30-04:30 04:30 04:30-06:00 04:30-06:00 06:00-06:30 06:00-06:30 06:30 06:30-09:00 06:30-09:00 09:00 09:00-15:30 09:00-13:00 13:00 13:00-14:00 14:00 14:00-15:30 15:30 15:30-18:00 15:30-18:00 Duration 24 hr 13hr 13hr 4-1/2 hr 5 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 2-1/2 hr 6-1/2 hr 4 hr lhr 1-1/2 hr 2-1/2 hr 2-1/2 hr Activity Rig moved 80.00 % Finish L/D plywood and matting boards on S-Pad. Move sub base to Y in road. P/U matting boards and re-position from sub base to S-Pad. Move sub base and pit modules onto S-Pad. Rig off station Move rig (cont...) Rig moved 100.00 % Raise derrick. L/D herculite and matts. Spot sub over well. Spot pit module. Connect service lines. Accept rig at 1900 hrs 7/19/99. At well location - Cellar Wellhead work Bleed down well PJSM - 40 psi on annulus. Bleed to 0 psi. Got back 2 1/2 bbls diesel. No gas. Completed operations Tested Hanger plug RJU lubricator. Pull BPV. Install TWC. Test TWC to 1000 psi. Hold pressure from the bottom. Leaking by from the top. No spare TWC or rebuild kit. Note: Bridge washed out due to high water. Pressure changed from 1000.0 psi to 0.0 psi in 0.00 hr - Downhole tol failure Removed Xmas tree N/D tree and adaptor. Removed Xmas tree Permission received to proceed forward. N/D tree and adapter spool. Wellhead work (cont...) Removed Xmas tree (cont...) Permission received to proceed forward. N/D tree and adapter spool. Equipment work completed Nipple up BOP stack Rigged up BOP stack Equipment work completed Nipple up Lubricator Installed Lubricator R/U lubricator and extension Began precautionary measures Monitor Annulus = 75 psi. Bled down while waiting on new 2-way check. Bled Annulus and Lubricator down to 0 psi. Removed Internal BOPs Pull 2-way check valve Began precautionary measures Opened bag. No fluid in sight - top off with 26 bbls to fill hole. Installed Internal BOPs Install new 2-way check valve. Equipment work completed Perform integrity test Tested Other sub-surface equipment - Via string Test 2-way ............ psi Test -~--' · bi IUl%~ 111lll lllUlkl Facility i PBS Pad Progress Report Well S- 1 lB Page 3 Rig Nabors 9ES Date 11 August 99 Date/Time 21 Jul 99 18:00 18:00-20:30 18:00-19:00 19:00 19:00-20:30 20:30 20:30-21:30 20:30-21:30 21:30 21:30-00:00 21:30-00:00 00:00 00:00-06:00 00:00-00:30 00:30 00:30-02:00 02:00 02:00-03:00 03:00 03:00-04:00 04:00 04:00-04:45 04:45 04:45-06:00 06:00 06:00-07:15 Duration 2-1/2 hr 1 hr 1-1/2 hr lhr 1 hr 2-1/2 hr 2-1/2 hr 6 hr 1/2 hr 1-1/2 hr 1 hr 1 hr 3/4 hr 1-1/4 hr 1-1/4 hr Activity to 250/4000 psi (well static). Function test completed satisfactorily Pull Single completion, 4-1/2in O.D. Retrieved Other sub-surface equipment Pull 2-way check, L/D lubricator and extensions. Completed operations Retrieved Tubing hanger Pull tubing hanger and single jt. of 4-1/2" tubing to floor, L/D same. Equipment work completed Derrick management Rigged up Top drive Change out 4-1/2" box by 4" Hitorq pin sub on top drive. Equipment work completed Test well control equipment Tested BOP stack Test BOPE to 250/4000 psi. Test Hydrill to 250/3500 psi. Function test completed satisfactorily Well static--fluid level stable for 6 hours. Wellhead work Held safety meeting In 0.10 hr had 56.000 bbl Gain - closed in well Hold PJSM. Prepare to install wear bushing. Blowdown secondary kill line- well flowed- shut in blind rams- observe 56 bbl gain to pits, some overflow of diesel to secondary containment, < 1 gallon on pad- excellent response. Monitor pressures Resumed operations Shut in drillpipe pressure @ 100 psi & constant for 1.5 hrs. Continue to clean up diesel from rigfloor and suck out secondary containment tanks on rig- clean up diesel on herculite and place absorbent down wind on pad. ( Weather conditions wet and windy) Bleed down well Completed operations Bleed down well- 100 psi bled down in 35 minutes- pressure not building when periodically shut in. Continue to bleed off until no further pressure- influx = air. Circulated at -0.0 ft Stopped: To flowcheck well Open blind rams- fill well with 56 bbls seawater ( equates to 760 ft, 270 psi diesel hydrostatic) Flow check Observed well static Observe well while continuing to clean up rig- well static. Installed Wear bushing Equipment work completed Install wear ring and prepare to pick up 8.1/2" slick drilling assembly with ported float. Well control Facility PBS Pad Progress Report Well S- 1 lB Page 4 Rig Nabors 9ES Date 11 August 99 Date/Time 06:00-07:15 07:15 07:15-06:00 07:15-12:00 12:00 12:00-13:00 13:00 13:00-15:00 15:00 Duration 1-1/4 hr 22-3/4 hr 4-3/4 hr 1 hr 2 hr Activity Flow check Opened Blind Rams and well started flowing. Observed gain of 13 bbls. Shut in well at 6.0 psi Bled pressure to 0 psi. Opened blind rams and fill well with 13 bbls seawater. Observed well static. BHA run no. 1 R.I.H. to 65.0 ft In 0.10 hr had 14.000 bbl Gain - closed in well Shut-in well. Lubed fluid into well (14 bbl). Monitor well. Observed well static. R.I.H. to 215.0 ft In 0.10 hr had 5.000 bbl Gain Well began flowing. Circulated diesel out through choke. R.I.H. to 2200.0 ft Began precautionary measures 22 Jul 99 15:00-15:30 15:30 15:30-17:30 17:30 17:30-22:00 22:00 22:00-00:00 00:00 00:00-00:30 00:30 00:30-01:00 01:00 01:00-06:00 06:00 06:00-10:30 06:00-09:30 09:30 09:30-10:30 10:30 10:30-06:00 1/2 hr 2 hr 4-1/2 hr 2 hr 1/2 hr 1/2 hr 5 hr 4-1/2 hr 3-1/2 hr 1 hr 19-1/2 hr Circulated at 2200.0 ft Hole displaced with Seawater - 100.00 % displaced Circulated from surface to surface. R.I.H. to 4500.0 ft Began precautionary measures Circulate surface to surface. Small amount of gas observed. R.I.H. to 8531.0 ft On bottom Circulated at 8531.0 ft Hole displaced with Seawater - 100.00 % displaced Circulated surface to surface. Saw cement on shakers @ bottoms up. Monitor for gas influx. Observe well static. Held safety meeting Began precautionary measures Continue to circulate hole clean and monitor. Hole stable. Tested Packer - permanent tubing conveyed - Via string Test 9-5/8" csg to 3000 psi for 30 minutes. 0 psi loss. Pressure test completed successfully - 3000.000 psi Drilled cement to 8617.0 ft Up wt. = 200 klb, dn wt.= 145-165 klb w/70 rpm, 5-7 kft-lb, 5klb on bit. 150 spin @ 1400 psi. Tagged Packer assembly Tagged top of liner. Pump 30 bbl hi vise sweep and circulate hole clean @ 150 spin, 1400 psi. BHA run no. 1 (cont...) Pulled out of hole to 95.0 ft At BHA Pulled BHA BHA Laid out Clean and clear floor. BHA run no. 2 Facility PBS Pad Progress Report Well S- 1 lB Page 5 Rig Nabors 9ES Date 11 August 99 Date/Time 23 Jul 99 10:30-12:00 12:00 12:00-14:30 14:30 14:30-17:00 17:00 17:00-22:00 22:00 22:00-23:00 23:00 23:00-00:00 00:00 00:00-01:00 01:00 O1:00-03:30 03:30 03:30-04:00 04:00 04:00-06:00 06:00 06:00-10:00 06:00-09:00 09:00 09:00-10:00 10:00 10:00-19:30 10:00-10:30 10:30 10:30-12:00 12:00 12:00-13:00 13:00 13:00-14:00 14:00 14:00-18:30 Duration 1-1/2 hr 2-1/2 hr 2-1/2 hr 5 hr 1 hr 1 hr 1 hr 2-1/2 hr 1/2 hr 2 hr 4 hr 3 hr 1 hr 9-1/2 hr 1/2 hr 1-1/2 hr 1 hr 1 hr 4-1/2 hr Activity Made up BHA no. 2 BHA no. 2 made up Made up B HA no. 2 P/U 3-1/2" HWDP, 42 jts. 4" DP. Completed operations R.I.H. to 8617.0 ft On bottom Drilled cement to 9078.0 ft ART = 4-1/4 hrs, ADT = 4-1/4 hrs Stopped to test casing Up wt = 210 klb, Dn wt = 150 klb, Rot tq = 175, Tq on=9 k, Tq off= 8 k Circulated at 9078.0 ft Pump sweep to clean hole for pressure test. Hole displaced with Water based mud - 100.00 % displaced Tested Casing - Via annulus and string Close rams, test to 4000 psi for 30 min. Function test completed satisfactorily Drilled cement to 9118.0 ft ART = 1/2 hr, Total DT = 4-3/4 hr. At Window · 9118.0 ft Stopped drilling 10 ft above whipstock. Circulated at 9118.0 ft Hole displaced with Water based mud - 100.00 % displaced Pumped 25 bbl hi visc. sweep and circulate hole clean Pulled out of hole to 8420.0 ft At Top of liner · 8420.0 ft POH above liner top. Serviced Block line Line slipped and cut Slip and Cut 30' of drlg line and service top drive and drum. BHA run no. 2 (cont...) Pulled out of hole to 860.0 ft At BHA Pulled BHA BHA Stood back Electric wireline work Held safety meeting PJSM = RFU Schlumberger wireline to run cement bond log. Completed operations Rigged up sub-surface equipment - Slickline / braided cable R/U e-line unit for cement bond log. Equipment work completed R.I.H. to 150.0 ft Cement bond log failed - Abort operation POOH to change out tools. Serviced Production logging tools Work completed, Logging/braided cable equipment changed out Change out logging tools Conducted electric cable operations RIH with USIT log (this was the only back-up O. ¥ ~I. IIO. UI~J. Progress Report Facility PBS Pad Well S- 1 lB Page 6 Rig Nabors 9ES Date 11 August 99 Date/Time Duration Activity 24 Jul 99 18:30 18:30-19:30 19:30 19:30-06:00 19:30-19:45 19:45 19:45-20:30 20:30 20:30-23:00 23:00 23:00-00:30 00:30 00:30-05:00 02:00 05:00 05:00-06:00 06:00-11:30 06:00-10:00 10:00 10:00-11:30 11:30 11:30-06:00 11:30-12:00 12:00 12:00-12:15 12:15 12:15-14:00 14:00 14:00-14:30 14:30 14:30-18:00 18:00 18:00-18:30 18:30 18:30-19:00 19:00 19:00-00:00 1 hr 10-1/2 hr 1/4 hr 3/4 hr 2-1/2 hr 1-1/2 hr 4-1/2 hr 1 hr 5-1/2 hr 4 hr 1-1/2 hr 18-1/2 hr 1/2 hr 1/4 hr 1-3/4 hr 1/2 hr 3-1/2 hr 1/2 hr 1/2 hr 5 hr Completed run with Cement evaluation tool from 6503.0 ft to 8572.0 TOC @ 7815' Rigged down sub-surface equipment - Slickline / braided cable Equipment work completed R/D Schlumberger and clear floor. BHA run no. 3 Held safety meeting PJSM-PFU mill ass' y. Completed operations Made up BHA no. 3 B HA no. 3 made up R.I.H. to 9110.0 ft On bottom Drilled cement to 9170.0 ft Cement drilled at 40-50 ft/hr, w/10-15 klb on bit. Completed operations Circulated at 9170.0 ft Obtained bottoms up (100% annulus volume) Began precautionary measures Change over to drlg fluid-pump hi-vis/lo-vis sweep. Obtained clean returns. Pulled out of hole to 8000.0 ft BHA run no. 3 (cont...) Circulated at 8627.0 ft Check for flow at liner top, pump pill. Hole swept with slug - 100.00 % hole volume Blow down top drive and remove blower hose. Continue to POOH. Pulled BHA L/D excess HWDP and steel dc' s. BHA Laid out BHA run no. 4 Removed Drillfloor / Derrick Clear floor and prepare to p/u BHA #4. Equipment work completed Held safety meeting PJSM = P/U BHA #4 Completed operations Made up BHA no. 4 B HA no. 4 made up BHA wt = 15,000 lbs. Tested MWD - Via string Function test completed satisfactorily R.I.H. to 8627.0 ft RIH w/4" DP in stands to liner top. Record baseline ECD data and orient tool face 20 degrees left. Stopped: To service drilling equipment Serviced Top drive Equipment work completed R.I.H. to 9170.0 ft On bottom Drilled to 9188.0 ft Time drill from 9170' (2'/hr for 2 hrs, 4'/hr for 2 hrs,,~ ~ .... ,,,, for I hr). Prudhoe Bay Unit Alaska State, Plane Zone 4 PBU_WOA S Pad, Slot S-11A S-IIA Job No. AKMM90019, Surveyed: 4 December, 19'98 RECEIVED DEC 2 zl 1,998 BPXA PDC S UR VEY REPORT ORIGIN,4L 17 December, 1998 Your Reft API-500292172801 KBE- 66.90' MWD Survey Instrument Surface Coordinates: 5979854.50 N, 620017.34 E (70° 21' 12.8400' N, 149° 01'31.5000" W) spemr,~j-sum DRILLING ~ I~R, Vl I: E 5 Survey Reft svy4478 Sperry-Sun Drilling Services Survey Report for S-1 IA Your Ref: API,500292'172801 Job No. AKMM90019, Surveyed: 4 December, 1998 Prudhoe Bay Unit Measured Depth (ft) Incl. Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 9099.10 23.270 149.290 8504.87 8571.77 9138.00 23.290 146.780 8540.60 8607.50 9164.88 25.220 145.360 8565.11 8632.01 9193.07 33.050 144.260 8589.71 8656.61 9225.64 42.110 143.650 8615.50 8682.40 9257.45 50.110 142.900 8637.53 8704.43 9289.15 58.920 139.120 8655.92 8722.82 9317.23 66.680 137.790 8668.75 8735.65 9354.65 76.550 132.920 8680.54 8747.44 9389.13 80.610 128.470 8687.37 8754.27 9419.76 83.900 125.440 8691.50 8758,40 9450.97 86.800 122.410 8694.03 8760.93 9513.35 89.600 121.530 8695.99 8762.89 9544.30 90.610 121.390 8695.93 8762.83 9574.43 89.970 121.320 8695.78 8762.68 9607.26 86.300 122.030 8696.85 8763.75 9638.96 85.970 122.020 8698,99 8765.89 9669.72 86.830 123.300 8700,92 8767.82 9700.90 87.850 123.400 8702,36 8769.26 9730.45 87.700 123.240 8703.51 8770.41 9761.84 85.040 123.250 8705,50 8772.40 9795.49 84.670 123,950 8708.52 8775,42 9825.4'1 85.320 123.190 8711.13 8778.03 9856.14 86.950 123.810 8713.20 8780.10 9888,10 88,340 124.120 8714.51 8781.41 Local Coordinates Global Coordinates Northings Eastings Northlngs Eastlngs (ft) (ft) (ft) (ft) 1537.01 S 1676.10 E 5978344.54 N 621717.85 E 1550.05 S 1684.24 E 5978331.63 N 621726.19 E . 1559.21 S 1690.40 E 5978322.57 N 621732.50 E 1570.41 S 1698.32 E 5978311.50 N 621740.60 E 1586.44 S 1710.01 E 5978295.65 N 621752.54 E 1604.80 S 1723.71 E 5978277.52 N 621766.54 E 1624.80 S 1739.97 E 5978257.78 N 621783.11 E 1643.47 S 1756.52 E 5978239.37 N 621799.97 E 1668.67 S 1781.47 E 5978214.58 N 621825.31 E 1690.69 $ 1807.09 E 5978192.98 N 621851.28 E 1708.93 S 1831.34 E 5978175.13 N 621875.82 E 1726.28 S 1857.14 E 5978158.19 N 621901.90 E 1759.29 $ 1910.03 E 5978126.03 N 621955.31 E 1775.44 S 1936.43 E 5978110.30 N 621981.96 E 1791.12 S 1962.16 E 5978095.04 N 622007.94 E 1808.35 S 1990.08 E 5978078.26 N 622036.13 E 1825.12 S 2016.89 E 5978061.92 N 622063.21 E 1841.69 S 2042.74 E 5978045.77 N 622089.32 E 1858.81 $ 2068.76 E 5978029.07 N 622115.61 E 1875.03 S 2093.43 E" 5978013.25 N 622140.54 E 1892.20 S 2119.63 E 5977996.50 N 622167.01 E 1910.75 $ 2147.54 E 5977978.40 N 622195.21 E 1927.23 S 2172.38 E 5977962.32 N 622220.31 E 1944.15 S 2197.94 E 5977945.81 N 622246.14 E 1961.99 S 2224.43 E 5977928.39 N 622272.91 E Alaska State Plane Zone 4 PBU WOA S Pad Dogleg Rate (°/IOOf-t) Vertical Section (ft) Comment 2.551 7.500 27.840 27.840 25.206 29.431 27.954 29.116 17.280 14.540 13.415 4.705 3.295 2.137 11.386 1.041 5.006 3.287 0.742 8.474 2.346 3.335 5.673 4.456 2229.26 2242.97 2252.98 2265.55 2283.84 2305.06 2329.31 2353.14 2387.51 2420.83 2451.01 2482.07 2544.41 2575.36 2605.49 2638.29 2669.92 2700.60 2731.73 2761.23 2792.54 2826.02 2855.80 2886.43 2918.32 Tie-on Survey Window Point Continued... 17 December, 1998 - 11:25 - 2 - DrillQuest Sperry-Sun Drilling Services Survey Report for S-I lA Your Ref: API-500292172801 Job No, AKMM90019, Surveyed: 4 December, 1998 Prudhoe Bay Unit Measured Depth (ft) Incl, Azim. Sub-Sea Depth (ft) Vertical Depth (ft) 9918.30 89.540 124.410 8715.07 8781.97 9948.36 90.650 124.550 8715.02 8781.92 9981.76 91.470 123.990 8714.40 8781.30 10044.50 92.990 124.830 8711.96 8778.86 10074.07 94.160 123.700 8710.12 8777.02 10122.18 94.690 124.780 8706.40 8773.30 10165.50 91.120 122.770 8704.21 8771.11 10198.11 89.970 122.420 8703.90 8770.80 10229.78 87.820 121.450 8704.51 8771.41 10260.56 87.780 121.770 8705.69 8772.59 10354.66 88.980 119,620 8708,35 8775,25 10402.14 88.890 118.370 8709,23 8776,13 10447.60 88.330 117.870 8710,34 8777,24 10541.67 89.320 117,500 8712,27 8779.17 10633,91 92.190 116.140 8711,05 8777,95 10726.15 92.060 115.780 8707,63 8774,53 10820.15 94.860 114.870 8701.96 8768.86 10869.85 95.210 114,720 8697.60 8764,50 10910.79 95,790 115,690 8693,67 8760.57 10992.63 94.250 113.270 8686,51 8753,41 11050.00 94.250 113.270 8682.26 8749,16 Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) (ft) (ft) (ft) 1978.99 S 2249,38 E 5977911,80 N 622298,13 E 1996.01S 2274.16 E 5977895.18 N 622323,18 E 2014,81S 2301,76 E 5977876.82 N 622351,08 E 2050,24 S 2353,48 E 5977842,22 N 622403,36 E 2066.85 S 2377,86 E 5977826,00 N 622428,01E 2093,84S 2417,52 E 5977799,65 N 622468,09 E 2117.89 S 2453,47 E 5977776.18 N 622504,42 E 2135,45 S 2480,95 E 5977759,06 N 622532,17 E 2152.20 S 2507,82 E 5977742,75 N 622559,31 E 2168,32 S 2534,01 E 5977727.05 N 622585,76 E 2216,34 S 2614,89 E 5977680.34 N 622667,39 E 2239,35 S 2656,41 E 5977657.99 N 622709,28 E 2260.77 S 2696,49 E 5977637,22 N 622749,70 E 2304.46 S 2779,77 E 5977594.86 N 622833.67 E 2346,07 S 2862.07 E 5977554.58 N 622916.63 E 2386.42 S 2944,95 E 5977515,56 N 623000,14 E 2426,55 S 3029,75 E 5977476,79 N 623085,57 E 2447.31S 3074.69 E 5977456,75 N 623130,84.E 2464,67 S 3111.56 E 5977439,99 N 623167.99 E 2498,45 S 3185,75 E -' 5977407,41N 623242,71E 2521.05 S 3238,31E 5977385.65 N 623295,62 E Alaska State Plane Zone 4 PBU WOA S Pad Dogleg Rate (°/100ft) Vertical Section (ft) Comment 4,088 3.722 2.973 2,768 5.496 2,495 9,454 3.686 7,447 1,047 2,616 2,639 1,651 1,123 3,443 0,415 3,132 0.766 2,751 3,495 0,000 2948,47 2978,48 3011,82 3074.41 3103.88 3151,77 3194,98 3227,58 3259.23 3289,99 3384,04 3431,48 3476,87 3570,75 3662.71 3754,51 3847,85 3897,05 3937.59 4018,56 4O75,24 Projected Survey Continued... 17 December, 1998 - 11:25 - 3 - DrillQuest Sperry-Sun Drilling Services Survey Report for S-11A Your Ref: API-500292'172801 Job No. AKMMgO0'I9, Surveyed: 4 December, '1998 Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA S Pad All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 27.666° (20-Nov-98) The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 121.120° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11050.00ft., The Bottom Hole Displacement is 4103.94ft., in the Direction of 127.901 ° (True). Comments Measured Station Coordinates Depth TVD Northings Eastings Comment (ft) (ft) (ft) (ft) 9099.10 8571.77 1537.01 S 1676.10 E Tie-on Survey 9138.00 8607.50 1550.05 $ 1684.24 E Window Point 11050.00 8749.16 2521.05 S 3238.31 E Projected Survey 17' December, 1998 - 11:25 - 4 - DrillQuest STATE OF ALASKA ALASKA-~IL AND GAS CONSERVATION C0~'MISSION APPLICATION FOR SUNDRY APPROVAL Type of Request: [~Abandon [] Suspend [] Plugging [--ITime Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1646' SNL, 1855' EWL, SEC. 35, T12N, R12E, UM At top of productive interval N/A At effective depth 2978' SNL, 3396' EWL, SEC. 35, T12N, R12E, UM At total depth 4167' SNL, 5093' EWL, SEC. 35, T12N, R12E, UM Type of well: I--I Development [] Exploratory [--] Stratigraphic []Service 6. Datum Elevation (DF or KB) KBE = 66.90' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number S-11Ai 9. Permit Number 98-230 / 398-331 10. APl Number 50-029-20728-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11050 feet true vertical 8749 feet Effective depth: measured 8528 feet true vertical 8056 feet Casing Length Size Structural Conductor 110' 20" x 30" Surface 2650' 13-3/8" Intermediate 9107' 9-5/8" Production Liner 1377' 7" Plugs (measured) Junk (measured) Abandonment Plug #1 - 17 Bbls Class 'G' (12/98) Abandonment Plug #2 - 30 Bbls Class 'G' (12/98) 4" Drill Pipe with 4-3/4" BHA. Total length is 553' located from 9297' - 9850'. (12/98) Cemented MD 'I-VD 8 cu yds Concrete 110' 110' 3767 cu ft Arcticset II 2679' 2679' 1240 cu ft Class 'G', 130 cu ft AS I 9136' 8605' 390 cuft Class 'G' 8627' - 9138' 8144' - 8607' Perforation depth: measured None true vertical None ORIGINAL Tubing (size, grade, and measured depth) 1 Joint of 4-1/2" tubing to about 40' Packers and SSSV (type and measured depth) None Anchorage 13. Attachments [~ Description summary of proposal [] Detailed operations program [~ BOP sketch 4. Estimated date for commencing operation June 30, 1999 16. If proposal was verbally approved Name of apl)rover Date approved Contact Engineer Name/Number: Bill Isaacson, 564-5521 15. Status of well classifications as: [] Oil [~ Gas [] Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~.~. ~ ~ Dan Stone ' Title Senior Drilling Engineer Commission Use Only Date I Approval No.~, Conditions of Approval: Notify Commission so representative may~ witness Plug integrity ----" BOP Test~ Location clearance ~ Mechanical Integrity Test Subsequent form req..~r~'~'~-~__ · . ORIGI.NAL SIGN. ED BY ~?,o',~'"~:~,~ ~//f ~.- Approved by order of the Comm,ss,on Robert: N. Chris,ensor!, ' ~',, J'~.~ommissioner Form 10-403 Rev. 06/15/88 ~ Submit In Triplicate . hared ' ¢i _ervices rilling Alaska ~ BP Exploration / ARCO Alaska Inc. To: Blair Wondzell - AOGCC Date: June 3, 1999 William Isaacson Re-Enter Suspended Well DS S-11Al for Sidetrack Operations Form 10-403 Attachment APl #50-029-20728-01 From: Subject: Reference: This memo is written as an attachment to form 10-403 for the re-entry of the suspended well DS S-11Ai (APl #50-029-20728-01). The 6" open hole interval was plugged back and abandoned prior to suspending operations on the well during the November 1998 sidetrack operations. Nabors 9ES is expected to move on S-11Ai in late June and re-enter the well to sidetrack to a different bottom hole location. November 1998 Sidetrack Operations Well S-11Ai was planned as a WAG injection extended horizontal sidetrack targeting Zone 4. The original completion was retrieved and a whipstock window milled, exiting the 7" casing at 9138' / 8607' TVD (at the top of Sag River). Perforations below the kickoff point were P&A'd during pre-rig operations. The 6" production wellbore was drilled from the whipstock window at 9138' to a final TD at 11,050'. The wellbore crossed an unmapped rubble zone where lost circulation was reported as high as 900 bph. The drill string became stuck at 9850' while attempting to control the lost circulation. Subsequent fishing operations failed to retrieve the drill string, which was backed off at 9297'. Plans to plug back the well included setting a balanced cement plug from the top of fish at 9297', extending up into the 7" casing -300' above the whipstock window. An initial attempt to plug back the well failed when the cement apparently fell downhole after being spotted. A second plug of larger volume was then successfully spotted from on top of the fish at 9297'. The cement plug was tagged at 8528' and pressure tested to 3000 psi. This places the TOC in the 9-5/8" casing, approximately 100' above the 7" liner top and 610' above the whipstock window. See attached schematic for details. Planned Sidetrack Operations 1. MIRU Nabors 9ES. 2. Nipple down tree. Nipple up and test BOPE. 3. RIH with 8-1/2" bit on clean-out assembly and drill cement from 8528' to top of 7" liner. Pressure test 9- 5/8" casing against cement plug. POOH. 4. RIH with 6" bit on clean-out assembly and drill cement from 7" liner top to -9123' (+/-15' from top whipstock). POOH. 5. RIH with 7" Baker whipstock window mills and clean out cement across whipstock face, as required. 6. RIH with 6" drilling asssembly. Kick-off and drill production hole section as per submitted S-11Bi sidetrack plan. Proceed with operations as per submitted S-11Bi Permit to Drill. If you have any questions or require additional information please contact me at you convenience. William Isaacson Operations Drilling Engineer 564-5521 Wk 275-4365 Pgr 333-7546 Hm CUrrent WellbOre Status BF/MSL= 39i40' hanger landed in wellhead with 1 jt of 4-1/2" tubing below hanger. 13-3/8", 72#, L-80 12679' I Top of cement plug tagged with DP at 8582' and pressure tested to 3000 psi. Dressed @ 94 ss. ~ ~-~ Top of 7" 26# L-80 Buttress 19136'1 9-5/8"47# L-80 Buttress K.O.P @ 9138'(2' below 9-5/8" shoe) Perforations: 9288' - 9450' Cmt / CarbOlite 9450'. 9580' PBTD ~ 1 7" 26# L-80 110,004'1 !a ea red .rvices r lling WELL NAME S-11Ai DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET The attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT ['~ Permit Documentation Prepared: ODE: Date: D Permit Application Reviewed: SDE/ES: Date: ~-'i Permit Application Submitted: TA: Date: PRE-RIG WORK E3 Pre-Rig Memo Reviewed: SDE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: Date: SUNDRY NOTICE ["~"1 Sundry Documentation Prepared: ODE: 1.J'~- }~. ~,.,.,._.____ Date: [-"~ Sundry Application Reviewed: SDE/ES: ~----~'),._,,~'~..~q~Date: S und~ppli~)~ti?~S~ubmitted: TA.'~I~~ ~ NOTE: IF SUNDRY IS FOR PRE-RIG WORK, USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that a_p. ply) Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimulate Other(Explain): I APPROVAL TO PROCEED I Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: STATE OF ALASKA ALASKA O,=AND GAS CONSERVATION COM~(SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown []Stimulate [] Plugging [] Perforate I--~Pull Tubing []Alter Casing [] Repair Well [] Other Suspended 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1646' SNL, 1855' EWL, SEC. 35, T12N, R12E, UM At top of productive interval N/A At effective depth 2978' SNL, 3396' EWL, SEC. 35, T12N, R12E, UM At total depth 4167' SNL, 5093' EWL, SEC. 35, T12N, R12E, UM 5. Type of well: [] Development [] Exploratory F-I Stratigraphic [~ Service 6. Datum Elevation (DF or KB) KBE = 66.90' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number S-11Al 9. Permit Number / Approval No. 98-230 398-331 10. APl Number 50-029-20728-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11050 feet true vertical 8749 feet Effective depth: measured 8528 feet true vertical 8056 feet Casing Length Size Structural Conductor 110' 20" x 30" Surface 2650' 13-3/8" Intermediate 9107' 9-5/8" Production Liner 1377' 7" Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) Plugs (measured) Junk (measured) Abandonment Plug #1 - 17 Bbls Class 'G' (12/98) Abandonment Plu_q #2 - 30 Bbls Class 'G' ('12/98~ 4" Drill Pipe with 4-3/4" BHA. Total length is 553' located from 9297' - 9850'. ('12/98~ Cemented MD TVD 8 cu yds Concrete 110' 3767 cu ft Arcticset II 2679' 1240 cuft Class 'G', 130 cuft AS I 9136' 110' 2679' 8605' 390 cuft Class 'G' 8627' - 9138' 8144' - 8607' R CE ¥ D 1 Joint of 4-1/2" tubing to about 40' JAN ]9 I999 Oil & 8aS Cons, L;ommissio~ Anchorage Packers and SSSV (type and measured depth) None 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure ORIGINAL 14. Prior to well operation: Subsequent to operation: 5. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service 7. I hereby certify that the forego~and correct to the best of my knowledge Signed Dan Stone Title Engineering Supervisor Prepared By Name/Number: Date I/I~ / e'1':1 Terrie Hubble, 564-4628 Form 10-404 Rev. 06/15/88 Submit In Duplicate Progress Report Facility PBS Pad Well S-11A Page 1 Date 15 January 99 Date/Time 14 Nov 98 12:01-22:30 22:30-23:00 23:00-06:00 15 Nov 98 06:00-10:30 10:30-20:00 20:00-03:30 16 Nov 98 03:30-06:00 06:00-06:15 06:15-06:45 06:45-07:30 07:30-20:30 20:30-21:00 21:00-21:30 21:30-00:30 17 Nov 98 00:30-05:00 05:00-06:00 06:00-07:00 07:00-14:00 14:00-16:30 16:30-17:30 17:30-19:30 19:30-20:30 20:30-00:00 18 Nov 98 00:00-04:00 04:00-06:00 06:00-06:15 06:15-07:30 07:30-08:00 08:00-13:30 13:30-15:00 15:00-15:15 15:15-17:00 17:00-17:30 17:30-18:45 18:45-19:00 19:00-21:00 21:00-23:30 23:30-05:00 19 Nov 98 05:00-06:00 06:00-11:30 11:30-13:00 13:00-13:30 13:30-17:00 17:00-19:00 19:00-19:30 19:30-03:00 20 Nov 98 03:00-04:00 04:00-05:30 05:30-06:00 06:00-12:30 12:30-14:30 14:30-16:00 16:00-16:30 16:30-20:00 Duration 10-1/4 hr 1/2 hr 7hr 4-1/2 hr 9-1/2 hr 7-1/2 hr 2-1/2 hr 1/4 hr 1/2hr 3/4 hr 13hr 1/2 hr 1/2 hr 3hr 4-1/2 hr lhr lhr 7hr 2-1/2 hr lhr 2hr lhr 3-1/2 hr 4hr 2hr 1/4 hr 1-1/4 hr 1/2 hr 5-1/2 hr 1-1/2 hr 1/4hr 1-3/4 hr 1/2 hr 1-1/4 hr 1/4hr 2hr 2-1/2 hr 5-1/2 hr lhr 5-1/2 hr 1-1/2 hr 1/2 hr 3-1/2 hr 2hr 1/2 hr 7-1/2 hr lhr 1-1/2 hr 1/2hr 6-1/2 hr 2hr 1-1/2 hr 1/2 hr 3-1/2 hr Activity Rigged down Drillfloor / Derrick Held safety meeting Rig moved 70.00 % Rig moved 90.00 % (cont...) Rigged up Drillfloor / Derrick Rig moved 100.00 % Fill pits with Seawater Fill pits with Seawater (cont...) Held safety meeting Removed Hanger plug Reverse circulated at 8530.0 ft Installed Hanger plug Tested Hanger plug Removed Xmas tree integral components Rigged up BOP stack Rigged up Bottom ram Rigged up Bottom ram (cont...) Tested BOP stack Removed Hanger plug Removed Tubing hanger Circulated at 8540.0 ft Laid down 80.0 ft of Tubing Set Retrievable packer at 30.0 ft with 700.0 psi Removed Seal assembly Removed BOP stack Removed BOP stack (cont...) Removed Tubing head spool Installed Seal assembly Rigged up Tubing head spool Installed Tubing head spool Tested Seal assembly Rigged up BOP stack Installed BOP test plug assembly Tested Bottom ram Retrieved BOP test plug assembly Retrieved Emergency hang off assembly Rigged up Tubing handling equipment Laid down 2100.0 ft of Tubing Laid down Tubing of 200.0 ft Laid down 8350.0 ft of Tubing (cont...) Rigged down Tubing handling equipment Installed Wear bushing Made up BHA no. 1 Singled in drill pipe to 1300.0 ft Serviced Top drive pipe handler Singled in drill pipe to 8555.0 ft Fished at 8562.0 ft Circulated at 8583.0 ft Pulled out of hole to 7500.0 ft Pulled out of hole to 322.0 ft (cont...) Laid down fish Made up BHA no. 2 Serviced Top drive pipe handler R.I.H. to 3100.0 ft Progress Report Facility PBS Pad Well S-11A Page 2 Rig (null) Date 15 January 99 Date/Time 20:00-20:30 20:30-01:00 21 Nov 98 01:00-03:00 03:00-06:00 06:00-08:00 08:00-09:30 09:30-11:30 11:30-15:30 15:30-16:00 16:00-16:30 16:30-02:00 22 Nov 98 02:00-04:30 04:30-06:00 06:00-08:00 08:00-08:30 08:30-10:00 10:00-11:00 11:00-12:30 12:30-14:30 14:30-17:30 17:30-19:30 19:30-23:00 23:00-02:00 23 Nov 98 02:00-03:00 03:00-04:45 04:45-06:00 06:00-06:15 06:15-07:00 07:00-13:00 13:00-15:00 15:00-17:00 17:00-18:00 18:00-18:30 18:30-00:30 24 Nov 98 00:30-03:00 03:00-06:00 06:00-07:00 07:00-07:30 07:30-08:00 08:00-11:00 11:00-12:00 12:00-12:30 12:30-14:30 14:30-17:00 17:00-21:30 21:30-04:30 25 Nov 98 04:30-06:00 06:00-06:30 06:30-07:30 07:30-09:30 09:30-12:00 12:00-12:30 12:30-15:00 15:00-01:00 Duration 1/2hr 4-1/2 hr 2hr 3hr 2hr 1-1/2 hr 2hr 4hr 1/2 hr 1/2 hr 9-1/2 hr 2-1/2 hr 1-1/2 hr 2hr 1/2 hr 1-1/2 hr lhr 1-1/2 hr 2hr 3hr 2hr 3-1/2 hr 3hr lhr 1-3/4 hr 1-1/4 hr 1/4hr 3/4 hr 6hr 2hr 2hr lhr 1/2 hr 6hr 2-1/2 hr 3hr lhr 1/2 hr 1/2 hr 3hr lhr 1/2 hr 2hr 2-1/2 hr 4-1/2 hr 7hr 1-1/2 hr 1/2 hr lhr 2hr 2-1/2 hr 1/2 hr 2-1/2 hr 10hr Activity Repaired Top drive pipe handler R.I.H. to 8579.0 ft Fished at 8579.0 ft Pulled out of hole to 5000.0 ft Pulled out of hole to 322.0 ft (cont...) Laid down fish Made up BHA no. 3 R.I.H. to 8540.0 ft Serviced Top drive pipe handler Singled in drill pipe to 8599.0 ft Milled Permanent packer at 8609.0 ft Circulated at 8609.0 ft Pulled out of hole to 6000.0 ft Pulled out of hole to 5000.0 ft (cont...) Serviced Top drive pipe handler Pulled out of hole to 329.0 ft Pulled BHA Laid down fish Pulled BHA Conducted slickline operations on Slickline equipment - Tool run Pulled BHA Made up BHA no. 4 R.I.H. to 3000.0 ft Serviced Block line R.I.H. to 9017.0 ft Fished at 9050.0 ft Fished at 9068.0 ft (cont...) Circulated at 9068.0 ft Pulled out of hole to 855.0 ft Pulled BHA Made up BHA no. 5 R.I.H. to 1600.0 ft Serviced Top drive R.I.H. to 9068.0 ft Milled Centraliser at 9169.0 ft Circulated at 9169.0 ft Circulated at 9169.0 ft (cont...) Tested Casing - Via string Serviced Top drive Pulled out of hole to 2260.0 ft Rigged up Handling equipment Held safety meeting Set Retrievable packer at 40.0 ft with 1000.0 psi Rigged down Tubing head spool Rigged up Tubing head spool Tested BOP stack Pulled out of hole to 2260.0 ft Tested Casing - Via string Pulled out of hole to 860.0 ft Pulled BHA Made up BHA no. 6 Held safety meeting Made up BHA no. 6 R.I.H. to 9139.0 ft Progress Report Facility PBS Pad Well S-11A Rig (null) Page 3 Date 15 January 99 Date/Time 26 Nov 98 27 Nov 98 28 Nov 98 29 Nov 98 30 Nov 98 01 Dec 98 O1:00-03:00 03:00-03:30 03:30-06:00 06:00-10:30 10:30-13:30 13:30-15:00 15:00-15:30 15:30-19:00 19:00-00:00 00:00-02:30 02:30-04:00 04:00-04:30 04:30-06:00 06:00-08:30 08:30-11:30 11:30-15:00 15:00-15:30 15:30-16:30 16:30-17:00 17:00-04:30 04:30-06:00 06:00-08:00 08:00-12:30 12:30-16:00 16:00-17:00 17:00-17:30 17:30-21:00 21:00-22:00 22:00-02:00 02:00-03:00 03:00-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-11:00 11:00-16:30 16:30-17:00 17:00-18:00 18:00-19:00 19:00-19:30 19:30-00:15 00:15-06:00 06:00-00:00 00:00-01:00 O1:00-03:00 03:00-03:30 03:30-05:00 05:00-06:00 06:00-10:00 10:00-10:30 10:30-11:30 11:30-12:30 12:30-12:45 12:45-14:00 Duration 2hr 1/2 hr 2-1/2 hr 4-1/2 hr 3hr 1-1/2 hr 1/2 hr 3-1/2 hr 5hr 2-1/2 hr 1-1/2 hr 1/2hr 1-1/2 hr 2-1/2 hr 3hr 3-1/2 hr 1/2 hr lhr 1/2 hr 11-1/2 hr 1-1/2 hr 2hr 4-1/2 hr 3-1/2 hr lhr 1/2hr 3-1/2 hr lhr 4hr lhr 3hr 1/2 hr 1/2 hr 1/2 hr 3-1/2 hr 5-1/2 hr 1/2 hr lhr lhr 1/2 hr 4-3/4 hr 5-3/4 hr 18hr lhr 2hr 1/2hr 1-1/2 hr lhr 4hr 1/2hr lhr lhr 1/4 hr 1-1/4 hr Activity Set tool face R.I.H. to 9159.0 ft Milled Casing at 9142.0 ft Milled Casing at 9151.0 ft (cont...) Drilled to 9168.0 ft Circulated at 9168.0 ft Pulled out of hole to 8627.0 ft Circulated at 8627.0 ft Pulled out of hole to 907.0 ft Pulled BHA Serviced Wear bushing Held safety meeting Made up BHA no. 7 Made up BI-IA no. 7 (cont...) Singled in drill pipe to 3409.0 ft R.I.H. to 8535.0 ft Held safety meeting R.I.H. to 9152.0 ft Washed to 9168.0 fi Drilled to 9377.0 ft Circulated at 9377.0 ft R.I.H. to 5657.0 ft Repaired Brake Pulled out of hole to 229.0 ft Pulled BI-IA Downloaded MWD tool Made up BHA no. 8 Serviced Block line Singled in drill pipe to 3650.0 ft Repaired Broke R.I.H. to 7514.0 ft R.I.H. to 9283.0 ft (cont...) Washed to 9377.0 ft Took MWD survey at 9377.0 ft Circulated at 9377.0 ft Pulled out of hole to 232.0 ft Pulled BHA Downloaded MWD tool Functioned M.W.D. tool Made up BHA no. 9 R.I.H. to 9287.0 ft Drilled to 9533.0 ft Drilled to 10060.0 ft (cont...) Circulated at 0.0 ft Circulated at 10427.0 ft Pulled out of hole to 9567.0 ft Circulated at 0.0 ft Circulated at 0.0 ft Circulated at 0.0 ft (cont...) R.I.H. to 10060.0 ft Drilled to 10098.0 ft Circulated at 10098.0 ft Pulled out of hole to 9940.0 ft Circulated at 9940.0 ft Progress Report Facility PBS Pad Well S- 1 lA Rig (null) Page 4 Date 15 January 99 Date/Time 14:00-14:30 14:30-16:30 16:30-22:00 22:00-23:30 23:30-00:30 02 Dec 98 00:30-05:30 05:30-06:00 06:00-07:00 07:00-07:30 07:30-12:30 12:30-14:30 14:30-15:00 15:00-16:00 16:00-17:00 17:00-18:00 18:00-22:30 22:30-00:00 03 Dec 98 00:00-02:00 02:00-06:00 06:00-06:30 06:30-07:00 07:00-08:00 08:00-08:20 08:20-08:25 08:25-09:00 09:00-09:30 09:30-10:30 10:30-12:00 12:00-13:00 13:00-13:30 13:30-21:00 21:00-21:30 21:30-06:00 04 Dec 98 06:00-13:30 13:30-14:30 14:30-15:30 15:30-16:30 16:30-17:30 17:30-17:50 17:50-18:00 18:00-18:30 18:30-19:00 19:00-00:00 05 Dec 98 00:00-06:00 06:00-07:30 07:30-09:00 09:00-09:30 09:30-12:30 12:30-13:30 13:30-14:00 14:00-15:30 15:30-20:30 20:30-01:00 06 Dec 98 01:00-04:00 Duration 1/2hr 2hr 5-1/2 hr 1-1/2 hr lhr 5hr 1/2 hr lhr 1/2 hr 5hr 2hr 1/2 hr lhr lhr lhr 4-1/2 hr 1-1/2 hr 2hr 4hr 1/2 hr 1/2 hr lhr 1/4 hr 0hr 1/2 hr 1/2hr lhr 1-1/2 hr lhr 1/2hr 7-1/2 hr 1/2hr 8-1/2 hr 7-1/2 hr lhr lhr lhr lhr 1/4 hr 0hr 1/2 hr 1/2 hr 5hr 6hr 1-1/2 hr 1-1/2 hr 1/2 hr 3hr lhr 1/2 hr 1-1/2 hr 5hr 4-1/2 hr 3hr Activity Pulled out of hole to 9100.0 ft Rest hole at 9100.0 ft Pulled out of hole to 235.0 ft Pulled BHA Made up BHA no. 10 Tested BOP stack Made up BHA no. 10 Made up BHA no. 10 (cont...) Serviced Top drive R.I.H. to 9160.0 ft Washed to 10098.0 ft Pulled out of hole to 9850.0 ft Circulated at 9850.0 ft Pulled out of hole to 8550.0 ft Circulated at 8550.0 ft Pulled out of hole to 240.0 ft Pulled BI-IA Made up BHA no. 11 R.I.H. to 9100.0 ft R.I.H. to 9850.0 ft (cont...) Circulated at 9850.0 ft Batch mixed slurry - 20.000 bbl Pumped Diesel spacers - volume 50.000 bbl Mixed and pumped slurry - 20.000 bbl Displaced slurry - 99.000 bbl Pulled out of hole to 9383.0 ft Circulated at 9383.0 ft Washed to 10098.0 ft Circulated at 10098.0 ft Drilled to 10106.0 ft Circulated at 10087.0 ft Held safety meeting Drilled to 10599.0 ft Drilled to 11050.0 ft (cont...) Pulled out of hole to 9850.0 ft Circulated at 9850.0 ft Batch mixed slurry - 50.000 bbl Washed to 9850.0 ft Pumped Diesel spacers - volume 50.000 bbl Mixed and pumped slurry - 50.000 bbl Displaced slurry - 70.000 bbl Circulated at 9850.0 ft Worked stuck pipe at 9850.0 ft Conducted electric cable operations Conducted electric cable operations (cont...) Conducted electric cable operations Worked stuck pipe at 8522.0 ft Conducted electric cable operations Reverse circulated at 8520.0 ft Pulled out of hole to 8425.0 ft Serviced Block line Pulled out of hole to 0.0 ft Made up BHA no. 12 R.I.H. to 8522.0 ft Progress Report Facility PBS Pad Well S- 11A Rig (null) Page 5 Date 15 January 99 Date/Time 07 Dec 98 08 Dec 98 09 Dec 98 04:00-05:00 05:00-06:00 06:00-11:30 11:30-18:30 18:30-19:00 19:00-21:30 21:30-02:30 02:30-04:00 04:00-05:00 05:00-06:00 06:00-06:30 06:30-10:00 10:00-10:30 10:30-11:30 11:30-13:30 13:30-14:30 14:30-17:30 17:30-19:00 19:00~19:30 19:30-20:30 20:30-21:30 21:30-00:45 00:45-03:00 03:00-03:15 03:15-06:00 06:00-08:00 08:00-11:30 11:30~12:00 12:00-12:30 12:30-13:00 13:00~14:30 14:30-15:30 15:30-17:00 17:00-20:00 20:00-23:30 23:30-01:00 01:00-02:00 02:00-04:00 04:00-04:30 04:30-06:00 06:00-07:30 07:30-08:30 08:30-10:30 10:30-11:30 11:30-12:30 12:30-14:30 14:30-16:00 16:00-17:00 17:00-18:00 18:00-18:30 18:30-19:00 19:00-20:30 20:30-21:30 21:30-22:30 Duration lhr lhr 5-1/2 hr 7hr 1/2 hr 2-1/2 hr 5hr 1-1/2 hr lhr lhr 1/2 hr 3-1/2 hr 1/2 hr lhr 2hr lhr 3hr 1-1/2 hr 1/2 hr lhr lhr 3-1/4 hr 2-1/4 hr 1/4 hr 2-3/4 hr 2hr 3-1/2 hr 1/2 hr 1/2 hr 1/2 hr 1-1/2 hr lhr 1-1/2 hr 3hr 3-1/2 hr 1-1/2 hr lhr 2hr 1/2hr 1-1/2 hr 1-1/2 hr lhr 2hr lhr lhr 2hr 1-1/2 hr lhr lhr 1/2 hr 1/2 hr 1-1/2 hr lhr lhr Activity Worked toolstring at 8522.0 ft Fished at 8522.0 fl Fished at 8522.0 ft (cont...) Conducted electric cable operations Worked stuck pipe at 8522.0 ft Conducted electric cable operations Pulled out of hole to 1054.0 ft Pulled BHA Serviced Kelly cocks Rigged up Tubing handling equipment Rigged up Tubing handling equipment Singled in drill pipe to 1208.0 ft Circulated at 1208.0 ft Rigged down Tubing handling equipment Made up BHA no. 13 R.I.H. to 3400.0 fl Repaired Electromagnetic brake R.I.H. to 8522.0 fl Worked toolstring at 8522.0 ft Washed to 8750.0 ft Circulated at 8750.0 fl Washed to 9515.0 fl Held safety meeting Held safety meeting Fill pits with Inhibited brine Fill pits with Inhibited brine (cont...) Circulated at 9515.0 ft Flow check Cleared Chicksan lines Washed to 9612.0 fl Circulated at 9612.0 ft Pulled out of hole to 8522.0 fl Circulated at 8522.0 fl Pulled out of hole to 5200.0 fl Laid down 2950.0 ft of 4in OD drill pipe Pulled BHA Rigged up Tubing handling equipment Laid down 1207.0 fl of 2-1/16in OD drill pipe Rigged down Tubing handling equipment Made up BHA no. 14 R.I.H. to 4100.0 ft Serviced Block line R.I.H. to 8522.0 fl Fished at 8522.0 ft Rigged up Rigging equipment Rigged up Logging/braided cable equipment R.I.H. to 9328.0 ft Conducted electric cable operations Pulled out of hole to 0.0 ft Installed Fishing tools R.I.H. to 9297.0 fl Conducted electric cable operations Pulled out of hole to 0.0 ft Rigged down Rigging equipment Progress Report Facility PBS Pad Well S-11A Rig (null) Page 6 Date 15 January 99 Date/Time 22:30-23:30 23:30-03:00 lODec98 03:00-05:00 05:00-06:00 06:00-06:30 06:30-06:45 06:45-10:00 10:00-10:15 10:15-10:30 10:30-11:30 11:30-14:30 14:30-15:00 15:00-19:30 19:30-20:00 20:00-21:00 21:00-22:00 22:00-22:30 22:30-22:45 22:45-23:30 23:30-00:00 11 Dec 98 00:00-06:00 06:00-11:30 11:30-14:30 14:30-16:30 16:30-18:30 18:30-19:00 19:00-22:30 22:30-23:00 23:00-02:30 12 Dec 98 02:30-03:30 03:30-04:00 04:00-04:30 04:30-05:00 05:00-05:15 05:15-05:45 05:45-06:00 06:00-07:30 07:30-18:00 18:00-19:30 19:30-20:00 20:00-21:00 21:00-04:00 13 Dec 98 04:00-04:45 04:45-05:45 05:45-06:00 06:00-06:45 06:45-08:00 08:00-13:00 13:00-14:00 14:00-14:30 14:30-15:00 15:00-17:00 17:00-17:30 17:30-20:30 Duration lhr 3-1/2 hr 2hr lhr 1/2 hr 1/4 hr 3-1/4 hr 1/4 hr 1/4 hr lhr 3hr 1/2hr 4-1/2 hr 1/2 hr lhr lhr 1/2 hr 1/4 hr 3/4 hr 1/2hr 6hr 5-1/2 hr 3hr 2hr 2hr 1/2hr 3-1/2 hr 1/2hr 3-1/2 hr lhr 1/2 hr 1/2 hr 1/2 hr 1/4 hr 1/2 hr 1/4 hr 1-1/2 hr 10-1/2 hr 1-1/2 hr 1/2 hr lhr 7hr 3/4 hr lhr 1/4hr 3/4 hr 1-1/4 hr 5hr lhr 1/2hr 1/2 hr 2hr 1/2 hr 3hr Activity Circulated at 9297.0 ft Pulled out of hole to 1829.0 ft Pulled BHA Laid down fish Removed Wear bushing Installed BOP test plug assembly Tested BOP stack Removed BOP test plug assembly Installed Wear bushing Rigged up Tubing handling equipment Singled in drill pipe to 1022.0 fi Rigged down Tubing handling equipment R.I.H. to 9150.0 ft Washed to 9297.0 ft Circulated at 9275.0 ft Batch mixed slurry - 17.000 bbl Mixed and pumped slurry - 17.000 bbl Displaced slurry - 82.000 bbl Pulled out of hole to 8340.0 ft Circulated at 8340.0 ft Wait on cement Wait on cement (cont...) Washed to 9297.0 ft Circulated at 9297.0 ft Pulled out of hole to 7150.0 ft Serviced Top drive pipe handler Pulled out of hole to 1029.0 ft Pulled BHA R.I.H. to 9297.0 ft Circulated at 9297.0 ft Held safety meeting Batch mixed slurry - 30.000 bbl Mixed and pumped slurry - 30.000 bbl Displaced slurry - 80.000 bbl Pulled out of hole to 8130.0 ft Circulated at 8130.0 ft Circulated at 8130.0 fl (cont...) Wait on cement Washed to 8528.0 ft Pulled out of hole to 8152.0 ft Tested Casing Laid down 7130.0 ft of 4in OD drill pipe Rigged up Tubing handling equipment Pulled BHA Rigged down Tubing handling equipment R.I.H. to 3550.0 fl Laid down 1350.0 ft of 4in OD drill pipe Freeze protect well - 160.000 bbl of Diesel Laid down 2200.0 fl of 4in OD drill pipe Rigged down Drillstring handling equipment Rigged down Wear bushing Installed Tubing hanger Tested Tubing hanger Rigged down BOP stack Facility PBS Pad Progress Report Well S- 11 A Rig (null) Page Date 7 15 January 99 Date/Time 20:30-22:00 22:00-23:30 23:30-00:01 Duration 1-1/2 hr 1-1/2 hr 1/2 hr Activity Installed Adapter spool Installed Xmas tree Tested Xmas tree STATE OF ALASKA ALASKA-,~tL AND GAS CONSERVATION CO-~MISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging nTime Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 t5. Type of well: [] Development I--I Exploratory [] Stratigraphic [~Se~ice 4. Location of well at surface 1646' SNL, 1855' EWL, SEC. 35, T12N, R12E, UM At top of productive interval 3534' SNL, 3905' EWL, SEC. 35, T12N, R12E, UM At effective depth (As Planned) At total depth 597' SNL, 2686' EWL, SEC. 01, T11N, R12E, UM (As Planned) . Datum Elevation (DF or KB) Plan RKB = 64.9' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number S-11Ai 9. Permit Number 98-230 10. APl Number 50-029-20728-01 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 11050 feet true vertical 8749 feet Effective depth: measured 9297 feet true vertical 8726 feet Casing Length Size Structural Conductor 110' 20" x 30" Surface 2650' 13-3/8" Intermediate 9107' 9-5/8" Production Liner 1377' 7" Plugs (measured) Junk (measured) 4" Drill Pipe with 4-3/4" BHA. Total length is 553' located from 9297' - 9850'. f12/98) Cemented MD TVD 8 cu yds Concrete 3767 cuft Arcticset II 1240 cuft Class 'G', 130 cu ft AS I 390 cuft Class 'G' 139' 139' 2679' 2679' 9136' 8605' 8627'-9138' 8144'-8607' Perforation depth: measured None true vertical None Tubing (size, grade, and measured depth) None Packers and SSSV (type and measured depth) None @RIGIN4L 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 4. Estimated date for commencing operation December 10, 1998 16. If proposal was verbally approved BlairWondzell o ~'' 12/9/98 Name of approver Date approved Contact Engineer Name/Number: C. Michael Jackson, 564-5480 I15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Prepared By Name/Number: Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~.._ -¢,,~. ~ Dan Stone Title Engineering Supervisor Commission Use Only Conditions of Approval: Notify Commission so representative may witness Date Plug integrity //" BOP Test__ Location clearance Mechanical Integrity Test Subsequent form require.q110-. . OO~'~ , ~,-~ u - o'4,er~ ,.~ Approved by order of the Commission ...... ~,v.¢-_w~, D ~ /~u,,,,,,,~,u.~, Form 10-403 Rev. 06/15/88 Submit In Triplicate S- ! 1~ WAG lniector. Proposed SuspeosiQn 13-3/8", 72#, L-80 ~ of 7" 26# L-80 Buttress Top 7" x 4.5" Baker Packer Top of 4.5" t2.6# L-80 mod Buttress 19136'] 9-5/8" 47# L~0 Buttress K.O.P @ 9'~38'(2' below 9-5/8" shoe) 11,050' Perforations: 9288' - 9450' ~ Cmt / Carbolite Sqz'd Perforations: 9450' - 9580' PBTD ~ 7" 26# L-80 [10.004'I DATE ~1/03/98 12/10/98 REV, BY CMJ CMJ COMMENTS Proposed Completion P~eposed Suspension PRUDHOE ~NI~ WELL: S-11Al APl NO: 50-029-20728-O1 SEC 35; T12.~LR12E BP E×pioration Alaska .._hared ' ' ervices rilling BP Exploration /ARCO Alaska Inc. To' From: Subject: Blair Wondzell - AOGCC C. Michael Jackson S-11Ai Proposed Suspension Form 10-403 Attachment Date: December 10, 1998 DESCRIPTION OF SCOPE CHANGE Well S-11Ai(API #50-029-20728-01) is planned as a WAG injection extended horizontal sidetrack targeting Zone 4. The original completion was retrieved and a whipstock window was milled exiting the 7" casing at 9138'(8607' TVD) at the top of Sag River. Perforations below the kickoff point have been P&A'd during pre-rig operations. The 6" production wellbore was drilled from a whipstock window at 9138' crossing an unmapped rubble zone where loss circulation was reported as high as 900 bph with a final TD at 11,050'. The drill string became stuck at 9850' while attempting to control loss circulation. Subsequently fishing operations failed to retrieve the drill string which was backed off at 9297'. The current forward operations are to set a balanced cement plug f. rom the top of the fish at 9297'(8726' TVD) to 8838'(8340' TVD) which is 300' above the Sag River kick off point at 9138'. This will cover the top 87' of the Shublik and completely cover the exposed Sag River. The cement plug will be Halliburton's Premium(G) with a volume of 17 bbl / 95 ft3 / 81 sks of 15.8 ppg and a yield of 1.18 cu.ft/sack. Should you have any questions please feel free to give me a call. Sincerely, C. Michael Jackson Operations Drilling Engineer 564-5486 Wk 275-1544 Pgr 349-1383 Hm cc Chris Russell Dan Stone COMPANY .SOHm AL^S A. CO P^N¥ WELL S-11 (33.35-12~12) COUNTY NORTH SLOPE ' _.STATE ALASKA LOCATION q 546 NL Sec 35 Twp. 12N Rge. . 12E APl Serial No. ,50=0,29,--20728 Other Services: 646'SNL & 1855'EWL ermanent Datum: Measured From )rilling, Measured From ,~ate ',un No. 1 -- Driller 962 -- 9932 Interval 9 g 26 8200 MSL , Elev .....0 _ Elev.: K.B. 67.8 RKB ,67.8 iFt. Above Perm. Datum D.F. 66.8 RKB . " G.L, ,32.9 Hole Size .5 iASING REC. Size Wt/Ft :urface 72 String 47 irod. iner 7 Casing Fluid Fluid Level Max. Rec. Tem Est. Cement To District Recorded By Witnessed B Grade L-8( BUTTR 1~-80 BUTTRESS oF 26 L-80 1J4S PRIMARY CEMENTING DATA TRING Surface Protection Production Liner 'ol. of cement of cement ,dditive 1 o/ IT'. o u~zu uu ~ UJ nterpreto' P . . · . ........ .-* ~,. il,,~l' or resnonslole t ~y lOSS, C~TS' GO ~ ' p ' '~ '~ '-.' · : ' t in the ca~ of ross or n~.gence on our par,, ........ r -- ' ...................... ~tmns, and we sh~l not, e~ep _ g ....... ~ ........ - ........... ~-~-~ ~==;~;~-~'-~-~r'~r ~S'-~te~-~6~t"' t6"claus~ 4' of buY'G~h~al' in~6~-b~6nb~i~hg--~m-~'ny'-[m&rpre~afib'n-made' ~ny or ~r o.~cers, agen~ or mm~,u7 ........ -- ..... r-~ · - s and Conditions ~ Ht out in Our current Price ~hedule. .. . 19.00 1.000 GR C GnP Z ) . . ....... ~' .(ms )! 1'200 so oo oo.o 2oo! '. - C~L CHV ) - = F'ILr iii'. I&l i I 1 l&l tl, .-.. 1, Ill I SI IBI III I: ~I I · 1-I I- III II Ii, II, II, I~l l-' I~1 Iii Ig, II, ll, I~1 Iii . III III I!1 I~1 I~ ill ! ! I~1 III !11 Il, II! III Il, Il, III Ill III Ill III iii I..I il, I~1 III II, Il, ......... lit Ill Ill Iii III III 8aoo 8300 8400 · . 8400 8500 ,, 8600 TOP 7~! · LINE'R · It' · '~1' g . . . ;~-I I~,-I _~! ,__-, ti ~ll.I "~'1 Iii Il III I~1 I~1 I Iii Ill Ill Ill i~l I~l lEI Iii ' I~1 I~1 j~l I~l I~1 I~1 l~l I~1 Ill I~1 I~! Iii Ill ~, 8700 0800 -' ~,~-I !, ~.1 t~ I 1~ ! ~ l~l ( I I~l ) I !~1 -~ ' I~ I ~ I~ ,, ~ i 1~1 ~ I~I ~ I I~I . I~I ~ ~ I I ~ ~ I~l ~ I I~ ~ [~l ~ ' I~l ~ ~ [~l ~ i i~l ~ I [~1 ~ ~ [~ ~ ~ [ ~ I ~ Il ~ I I~1 ~ ~. ' 1~1 ~ I I~1 ~ 1~1 ~ t l~l '-' ~ Ill . t~ I~1 t ................................. f .... q ....... i ~ r' -I ) I~1 I ~ 8900 9000 . _ 9100' . .. ~'- ~ ~-~ I~1 ~ I~1 ( I!1 ~ IBI ~ !~1 ~ Ill ~ ' I~1 ~ ~ I~I ~ Ill d~ I~1 / ~ Iii/ 1~1 ~ I Ifil ~ Ill iii > ~ III ' I~1 %~ ' ~ I~1 ~ I~1 ( I~1 ( I~t I ~ I~l 0 I:! I I_1_1 ~ G To,' WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3001 Porcupine Drive Anchorage, Alaska 99501 September 30, 1999 Formation Evaluation Logs S-1 lA, AK-MM-90019 S-11A: 2" x 5" MD Resistivity & Gamma Ray Logs: 50-029-20728-01 2" x 5" TVD Resistivity & Gamma Ray Logs: 50-029-20728-01 1 Blueline 1 Rolled Sepia 1 Blueline 1 Rolled Sepia PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 Date: Si ed' -~' ~ xc~,~t ',o?, BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 ° Fax (907) 563-7252 A Division of Dresser Industries. Inc, 01:i I Ll--I N G SGI:I~JI C ~ S WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Loft Taylor 3 001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs September 16, 1999 S-1 lA AK-MM-90019 1 LDWG formatted Disc with verification listing. API#: 50-029-20728-01 PLEASE ACKNOWLEDGE RECEIFr BY SIGNING AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Atto: Jan Galvin 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 Date: BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company mLQ-GGi%~ & LOCATION ,~r,~.'='~'~'~v~ - ~'~---~.,~ REPORT State cf Alaska ALASKA 0iL & ~1~ CO~S~::~'V'ATIC~ COMMISSION .~ev±ew ~_e well .== ~ ", and- ccmmenU cn plugging, well head suauus, and !oca=icn c~earance - ur=vide .lac. clear, code. Harke_ 'pos= or plate Location Clearance.- Code ftc. f- Signed _~' ,., ~ A e. ka ared rvices rilling To: From: Subject: Blair Wondzell - AOGCC C. Michael Jackson S-11Ai Cement Bond Log BP Exploration I ARCO Alaska Inc, Date: November 12, 1998 Mr Wondzell, There has been quite a lot of discussion in Shared Services Drilling on the upcoming S-11Ai injection sidetrack and others such as M-12Ai and S-24Ai, for cement bond logs across the 4.5" production liner to produce compliance with AOGCC regulations. The original wellbore, S-11, has a 1982 cement bond tog showing 182' of bonded cement above the Sag River top. The planned kick off point for S-11Ai is in the Sag River at 9147' md. If we run a CBL in the new 4.5" liner it would only show us cement in the liner lap and cement from the Sag, Shublik and Zone 4 since the well is horizontal. There would be no additional confirmation of isolation of injected fluids to the productive horizons. Please review the figure below and comment on same. C. MichaelJackson Opemtions Drilling Engineer 564-5486 Wk 275-1544 Pgr 349-1383 Hm TONY KNOWLE$, GOVERNOR ALASK& OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE. ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: ~907) 276-7542 November l~. ~ 1998 Dan Stone Engineering Supep,'isor BP Exploration (Alaska) Inc. POBox 196612 Anchora=c. AK 99519-6612 ~ . Prudhoe Bay Unit S- 11Ai BP Exploration (Alaska) Inc. Permit No: 98-230 Sur. Loc. 1646'SNL. 1855'EWL. Sec. 35. Ti2N. R12E. UM Btmhol¢ Loc. 597'SNL. 2686'EWL. Sec. 01. T11N. R12E. UM Dear Mr. Stone: Enclosed is the approved application for permit to redrill the abovc referenced wcil. The pcrmit to redrill does not exempt you from obtaining additional permits required by law from other governmental agcncics, and docs not authorize conducting drilling operations until all other required permitting dctcrminations are made. The blowout prcvcntion cquipmcnt (BOPE) must be tested in accordance with 20 AAC 25.035: and the n~cchanical integrity (,.'vii) of thc injection wells must be demonstrated undcr 20 AAC 25.412 and 20 AAC 25.030(g)(3). Sufficicnt notice (approximately 24 hours)of thc MI tcst before operation, and of thc BOPE test performed before drilling below the sur-r'acc casing shoe. must be givcn so that a rcprcscntativc of thc Commission may xvitncss the tests. Noticc may be given by contacting the Commission petroleum field inspector on thc North Slope pager at David W. Jol~l. ston Chairman BY ORDER OF THE COMMISSION dtffEnclosurc CC' Department of Fish & Game. Habitat Section v, vo enct. Department of Environmental Conservation w/o encl. SSD PBU Needs... Subject: SSD PBU Needs... Date: Mon, 9 Nov 1998 14:43:23 -0500 From: "Hubble, Terrie L (NANA)" <HubbleTL@bp.com> To: "'Fleck, Diana (AOGCC)'" <Diana_Fleck@admin. state.ak.us> CC: "'Hebert, Shelly (AOGCC)'" <Shelly_Hebert@admin.state.ak.us> Hi Ladies, Hope you had a wonderful weekend... Did you get to see the awesome Northern Lights the last couple of nights? Again, I don't need much this week (so far)! But, I leave on vacation on Thursday. So if possible could I get this by Wednesday? 10-401, S-11A Thanks ! Terri e Hubbl e Shared Services Drilling, M~8-1 564-4628, Fax: 564-5193 1 of 1 11/9/98 11:25 AM STATE OF ALASKA ALASK/. ,ILAND GAS CONSERVATION CO .... vllSSlON PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill lb. Type of well [] Exploratory [] Stratigraphic Test [] Development Oili [] Re-Entry [] Deepen [] Service [] Development Gas []Single Zone [] Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) i10. Field and Pool BP Exploration (Alaska) Inc. Plan RKB = 64.9' Prudhoe Bay Field / Prudhoe 3. Address i6. Property Designation Bay Pool P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 028260 4. Location of well at surface 17. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 1646' SNL, 1855' EWL, SEC. 35, T12N, R12E, UM Prudhoe Bay Unit At top of productive interval 8. Well Number Number 29100302630-277 3534' SNL, 3905' EWL, SEC. 35, T12N, R12E, UM S-11Ai At total depth 9. Approximate spud date Amount $200,000.00 597' SNL, 2686' EWL, SEC. 01, T11N, R12E, UM 11/15/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 028257, 597'I M-06i, 382' at 11801' MD 2560 14713' MD / 8670' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 9147' MD Maximum Hole Angle 103.3° Maximum surface 2582 psig, Attotal depth (TVD) 8675' /3450 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6" 4-1/2" 12.6# L-80 IBT-M 5716' 8997' 8482' 14713' 8736' 665 sx Class 'G' 119. To be completed for Redrill, Re-entry, and Deepen Operations. ~ ~ ~ ~ ~ ~ Present well condition summary Total depth: measured 10004 feet Plugs (measured) [';0V ~ 4 true vertical 9414 feet Effective depth: measured 9766 feet Junk (measured) Fill at 9766' ELMD (11/90~)~aska0ii~ ,.... - ~, ¢4asfiolls, Comm[ssior~ true vertical 9192 feet Anchorage Casing Length Size Cemented M D TVD Structural Conductor 110' 20" x 30" 8 cu yds Concrete 139' 139' Surface 2650' 13-3/8" 3767 cu ft Arcticset II 2679' 2679' Intermediate 9107' 9-5/8" 1240 cu ft Class 'G', 130 cu ft AS I 9136' 8605' Production Liner 1377' 7" 390 cu ft Class 'G' 8627' - 10004' 8144' - 9414' Perforation depth: measured 9288'-9363', 9373'-9424', 9438'-9466', 9526'-9580'Sqzd: 9466'-9474', 9489'-9526' true vertical subsea 8678' - 8950' (four intervals) 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: J. Allen Sherritt, 564-5204 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed <:.~.~-~__.-.¢-~, ~--- i, i~/ Dan Stone Title Engineering Supervisor Date Commission Use Only ¢~''-' 2--,~(-~ 50-029-20728-01 //"'"/~ for other requirements Conditions of Approval: Samples Required []Yes ~No Mud Log Required I--lYes [~No Hydrogen Sulfide Measures ~Yes [] No Directional Survey Required ~Yes [] No Required Working Pressure for BOPE r-12K; []3K; 1--14K; 1~5K; [--I10Kj []15K Other: 0rigii~ai ~;,._~ by order of Approved By David W. ,~0!',.. Commissioner the commission Date ///--',)~ Form 10-401 Rev. 12-01-85 Submit In Triplicate hared ~ '"~ ~ · ,erv ces rilling WELL NAME S-11Ai DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT 1-~ Permi/~oc/~r~en~n Pr~amd: / . ODE[~~~~/ Date'./c')~ D Per~t Application Reviewed: / ~' SDE/ES: "-. ~ ~' Date:~ ."/:: ,",:: ~ Permij/Applica[i~n ~u. blnitted: TA:'~ ~ ~ Date: {~/t~ PRE-RIG WORK Pre-Rig Memo Reviewed: SDE/ES: Date: Pre-Rig Memo Sent to Slope: ODE: Date: Pre-Rig Sundry Documentation Prepared: ODE: Date: Pre-Rig Sundry Application Reviewed: SDE/ES: Date: Pre-Rig Sundry Application Submitted: TA: Date: SUNDRY NOTICE Sundry Documentation Prepared: ODE: Date:.~ Sundry Application Reviewed: SDE/ES: Date: Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that apply) Abandon Change Approved Program Alter Casing Operation Shutdown Suspend Re-enter Suspended Well Repair Well Time Extension Plugging Perforate Pull Tubing Stimulate Variance ~. Other(Explain): ~ .... APPROVAL TO PROCEED Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date' hared ervices rilling WELL NAME S-11Ai DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) DRILLING PERMIT [?] PeI~fit Application Reviewed: SDE/ES: ' ~ . . -- ~. Date:~; ' - ~ PermiJ/Applica~n ~tlblnitted: TA:/~ ~ ~ Date ?/t~[~ SUNDRY NOTICE Sundry Documentation Prepared: ODE: Date: Sundry Application Reviewed: SDE/ES: Date: D Sundry Application Submitted: TA: Date: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW ~'l PRE-RIG WORK Reason for Sundry (Check all that apply) ~ Pre-Rig Memo Reviewed: SDE/ES: Date: ['~ Pre-Rig Memo Sent to Slope: ODE: Date: [ ~ Pre-Rig Sundry Documentation Prepared: ODE: Date: i'~ Pre-Rig Sundry Application Reviewed: SDE/ES: Date: [ [ Pre-Rig Sundry Application Submitted: TA: Date: Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Other(Explain): Change Approved Program Operation Shutdown Re-enter Suspended Well Time Extension Perforate Stimulate RECE VE ) r!OV --4 !99~ Anchorage APPROVAL TO PROCEED Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: IWell Name: I S-11Ai I Sidetrack Plan Summary Type of Redrill (producer or injector): I Injector Surface Location: Target 1 Location: X:620,017 Y=5,979,855 FNL: 1645', FWL: 1854', Sec. 35, T12N, R12E, UM X=622,100 Y=5,978,000 FNL: 3534', FWL: 3905', Section 35, T12N, R12E X=626,200 Y=5,975,725 FNL: 597', FWL:2686', SectiOn 01, T11N, R12E Bottom Hole Location: I AFE Number: J 4P1212 I Estimated Start Date: IMD: I 14,713 I I 11-15-98 Rig: I Nabors7ES Operating days to complete: ITVDsS 18670' I ]26 ~RKB ~64.9' Well Desitin (conventional, slimhole, etc.): I Ultra-slimhole Extended Horizontal Side-track IObjective: The extended horizontal sidetrack of S-1 li will replace the current M-30i injection and the I current M-13i injection. I Mud Program Production Hole (6" hole) Section: 6 % QUICKDRILn Density, ppg [ FunnelVis, sec 8.7 - 8.8 I 45 -55 NA 55000-75000 Keep Sand content at less than 0.25% in the production interval pH 8.5 - 9.0 HPHT FL, cc NC Directional KOP: 9,147' MD Maximum Hole Angle: 103.3° Close Approach Wells: M-06i M-13 M-19 M-30 382' @ 11,801' MD 629' @ 14550' MD 550'@ 13,463' MD 640'@ 11,249' MD Formation Markers Formation Tops MD TVD (SS) TSAG 9,146' 8547' KOP will be at 9,147'MD; 8548'TVDSS TSHUB 9,198' 8587' TSAD 9,285' 8675' Zone 4 9,285' 8675' Target Zone Target Polygon Start 9,723' 8730' TD 14,713' 8670' Zone 3 8854' Not penetrated Zone 2 Not penetrated HOT 8952 Not penetrated OOWC 8999 Not penetrated Casing/Tubing Program Hole Size Csg Wt/Ft Grade Conn Length Top Btm MD/TVD MD/TVD Existing 13-3/8" 72# L-80 BTRS 2,679' Surface 2,679'/2,678' Existing 9-5/8" 47# L-80 BTRS 9,136' Surface 9,136'/8,605' Existing 7" 26# L-80 BTRS 1,468' 8,627'/8,144' 10,004'/9,414' 6" 4.5" 12.6# L-80 I BT- MO D 5,716' 8,997'/8,482' 14,713'/8,736' Tubing 4.5" 12.62# L-80 NSCT 8,997' Surface 8,997'/8,482' Cement Lead Cement Tail Cement Casing/Liner Sx / Wt / Yield Sx / Wt ! Yield Comments P&A 63/15.8/1.15 Pre-Rig will P&A and displace cement to place TOC -9,100' MD, -188' above top , perf. 4-1/2" 665/15.8/1.15 Solid Cemented Liner, 15.8 ppg Class "G", TOC to 200' above liner top @ -8,797'MD Volume assumptions: Gauge hole + 50% excess(Production Hole); 80' shoe joints; TOC as listed. Logging Program ILogs: 6" Hole DPC Logs: Existing CBL: MWD/GR/RES from Horizontal to TD. DPC logs will be run after landing well horizontal. Existing 1982 CBL shows good cement bond 182' MD above the proposed KOPRVindow point. Well Control Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and will be capable of handling maximum potential surface pressures. Bottom hole pressure is expected to be 3450 psi @ 8675' tvdss. Maximum expected surface pressure at 8675' tvdss is 2582 psi (assuming gas column of 0.1 psi/ft) Diverter, and BOPE schematics on file with AOGCC. Hazards S-Pad is not classified as a H2S drillsite. Stuck pipe while drilling the Kingak has been reported in offset wells, however, the Kingak will not be penetrated. Lost circulation has been reported in the Sag River, Shublik and Ivishak production intervals. Three to five minor 10'-30' faults will be crossed in the polygon. Only minor losses are expected, however, potential for higher losses is possible and will need to be monitored closely. Shallow gas (Ugnu, W. Sak) will not be penetrated. Put River (gas) will not be penetrated. Kingak will not be penetrated. Disposal Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal. S-11Al Summary of Operations Pre-Rig Operations: The objective of the pre-rig work is to ascedain the condition of the 9 5/8" casing presently in the hole; P&A the existing perforations; chemical cut existing tubing in the first joint above production packer; and test the 9 5/8" pack offs. 1. Notify AOGCC of initiation prior to commencing any P&A operations. 2. NU on Well. 3. Bullhead Seawater down tubing to kill well and establish injectivity. 4. Perform_~l~lt-T. on 9 5/8" casing and 5 1//2" tbg to 3000 psi. IA/OA. 5. RIH with CTU, spot cement (83 sks; 12 bbl plus 5 bbls for squeeze.) from 9417'MD to place TOC at -9100' MD. 6. Pressure test against cement to 3000 psi, testing the 9 5/8", 7" and liner top. 7. RIH with 4 7/16" chemical cutter and chemically cut 5 1~,, tubing @ -8564' MD (middle of 5 Y2" 39' jt. above 9 5/8" Packer.) If the cutter will not go through the sliding sleeve at 8520' MD, then cut in the middle of the 5 Y2" 41' jt. above the sliding sleeve, -8499' MD. Notify Ops. Drilling Eng. if unable to cut tubing @ desired depth. 8. Freeze protect tubing and annulus. 9. Test packoffs on tubing hanger and 9 5/8" casing to 5000 psi (3500 psi on casing packoff if slip type, 5000 psi if mandrel type hanger), and carefully cycle Iockdown screws. Set BPV. 10. Clear location, dig out cellar, remove electrical lines, flow lines, and remove well house. 11. Wells S-35i and S-36i will need to be shut-in for rig move. Please co-ordinate with Bordes/Anglen for timing and if well houses will need to be removed. 12. RDMO Rig 1. 2. 3. 4. 5. 6. 7. 8. Operations The rig will MIRU. Confirm 9 5/8" packoffs tested to 5000 psi during pre-rig. Pull BPV. Circulate out freeze protection and circulate well with seawater. Set TWC and test to 1000psi. ND tree. NU BOP, and test BOP to 250/5000 psi. Pull the tubing to the chemical cut above the production packer @ -8499'MD. Change packoff (if failed in Pre-Rig) after pulling two jts. of tubing, set on storm packer, change and test new packoff. 9. RIH w/Overshot to top of tubing stump and pull K-anchor/SBR free. 10. RIH w/milling assembly; mill packer and retrieve packer/tubing tail. 11. RIH w/6" bit on 4" DP and dress cement top to 9169'MD. 12. Pressure test casing to 4000 psi for 30 mins. 13. RIH and set 7" whipstock/milling assembly and set 25° left of highside. 14. Displace to 6% KCI Quikdriln mud. 15. Mill window to place KOP @ 9,147' MD. 16. POOH and PU 6" kick off assembly with w/MWD/GR drill build & turn to horizontal @ -9,900' MD. 17. PU BHA for horizontal section w/MWD/GR/RES and drill to TD -14,713' MD. 18. Run DPC logs from horizontal through build section. 19. Run 4 Y2" L-80 liner and set 7" x 4 ~" hanger/packer TOL @ -8,997' MD. 20. Cement liner conventionally with 200' above T~L. RIH w/mill and clean out to landing collar if necessary. 21. Pressure test liner to 4000 psi for 30 mins. 22. RIH w/CBL/USIT to confirm cement job quality. 23. Perf as per asset direction -1500'. 24. Complete with no GLMs, an 3 X nipples, and XN nipple on 4-½' NSCT tubing and set w/7" x 4 ~" packer @ -8,947' MD (200' above the Sag. River.) 25. Pressure test tubing to 4000 psi. 26. Freeze protect well. 27. RDMO TREE: 6" CIW WELLHEAD: 13-3/8" McEVOY ACTUATOR: OTIS 9-5/8 DV PACKER I 2605 13-3/8", 72#/ft, L-80, BTRS 2679 IKOP: 2000' MAX ANGLE: 29 5-1/2", 17#/ft, L-80, BTRS, IPC TUBING TUBING ID: 4.892" CAPACITY: 0.0232 BBL/FT TOPOF I 8627 7" LINER 9-5/8", 47#/ft, 19136 L-80, BTRS PERFORATION SUMMARY REF: LOG: BHCS6-12-82 SF INTERVAL 9288-9352 9352-9363 9373-9424 9438-9466 9466-9474 9489-9526 9526-9580 OPEN/SQZ'D OPEN OPEN OPEN OPEN SQZ'D 12/89 SQZ'D 12/89 OPEN S-11i KB. ELEV = 67.80 BF. ELEV = 39.40 SSSV LANDING NIPPLE (5-1/2" RQM)(4.562" ID) 2103 J GAS LIFT MANDRELS ( OTIS W/ RA LATCH) N° I MD(EKE) TVDss 13 3109 3039 12 4598 4456 11 5492 5244 10 5987 5688 9 6142 5828 8 6553 6202 7 6712 6348 6 7066 6676 5 7223 6822 4 7760 7309 3 7916 7448 2 8217 7712 I 8374 7850 SLIDING SLEEVE OTIS 8520 (4.562" MIN. ID) TUBING SEAL ASSY. 8583 20' BAKER SBR 9-5/8" PACKER (BAKER)(4.00"ID) 8603 4-1/2", 12.6#/ft, L-80 TAILPIPE I (OTIS) (3.813" ID) 8649 4-1/2 .... XN" NIPPLE I (OTIS) ( 3.725" ID) I 8683 4-1/2" TBG TAIL I 8715 I BAKER SOS (3.958" ID) I ELDM (1-9-84 PERF) I 8696 NO MARKER JOINT Expected top of Cmt o 9417' (12/21/94) Top of 20/40 Card - 9427" Top of Cmt Cap - 9450" Top Of Card - 9479' 7", 26#/ft, L-80, BTRS DATE PBTD 9-10-94/12-21/94 9962 10004 REV. BY BIXBY 6-16-82 8-30-89 PCS PUT ON MAC 1-26-94 GSH UPDATE 12/89 SQZ Lee H./J KA COMMENTS COMPLETED BERFS San~llEack with Cmt Cap PRUDHOE BAY UNIT WELL:S-11 f33-35-12-13) APl NO: 50-029-20728 ;12E BP Ex Ioration 'Alaska S-11i P&A CONDITION 9-5/8 DV PACKER 13-3/8", 72#/ft, L-80, BTRS 26O5 2679 IKOP: 2000' MAX ANGLE: 29 TOP OF 7" LINER 8627 9-5/8", 47#/ft, I 9136 L-80, BTRS I PERFORATION SUMMARY SIZE SF 3-3/8 3 -3/8 3 -3/8 3 -3/8 2-7/8 2-7/8 3-3/8 INTERVAL OPEN/SQZ'D 9288-9352 9352-9363 9373-9424 9438-9466 9466-9474 9489-9526 9526-9580 P&A P&A P&A P&A SQZ'D 12/89 SQZ'D 12/89 P&A 7", 26#/ft, L-80, BTRS DATE PBTD REV. BY BIXBY 9962 100O4 JAS 6-16-82 8-30-89 PGS PUT ON MAC 1-26-94 GSH UPDATE 12/89 SQZ 9-17-98 P&A Condition COMMENTS COMPLETED ~ EZSV Set @ 9169' MD ~ 25 bbls Cement Displaced to P&A Expected top of Cmt - 9417' (12/21/94) Top of 20/40 Garb - 9427' Top of Cmt Cap - 9450' Top Of Garb - 9479' PRUDHQE BAY UNIT WELL;S-Il (33-35-12-13) APl NO: 50-029-20728 SE(~ 3~; T12N; R(~12E BP Exploration (Alaska) 13-3/8" 72# L-80 BTRS 2,679' MD S-11Ai Sidetrack PROPOSED COMPLETION DESIGN SIDETRACK OUT OF 7" Casing 5 1/2" 17#, NSCT L-80 XO to 4 1/2" + 2200' X Nipple 4-1/2" L-80, 12.6#, NSCT Tubing TOL 7" 8627'MD '(OP - 9,147' MD 4 1/2" Liner centralization: Run Turbolators in the fol- lowing configuration: 2 - Righthanded per joint. If Iow dogleg and good hole conditions. Run Straight Blades: 1 per joint if hole conditions warrant. x Nipple 7"x 4 1/2" Production packer @ + 8,947' MD X Nipple and XN Nipple Top of 4-1/2" L-80, 12.6:¢, IBT-MOD Liner @ + 8,997' MD 9 5/8" 47# L-80 BTRS 9136'MD TOC @ + 9,167' MD 4-1/2" Solid cemented liner to TD @ 14,713' MD 7" 26# 10,004' MD Date _ R. evis_ed~by_ Comments 10/21/98 JAS Proposed completion PRUDHOE BAY UNIT ..... WELL: S-11Ai APl #: 50-029-20728-01 z Prudhoe Bay Unit Alaska State Plane Zone 4 PBU_WOA S Pad S-11A -20(10 Scale: 1inch = BOOft DO 24~0 3~0o > ~2oo - -3600 - II I I 2.400 3200 Eastings 4~ln0 4alOO 5600 .I / 8770.40 ~ 64~0 4 1/2' Unel 14713.40 hfD 8736.40 TVD I [ I I 400,0 4000 5600 6400 Easfings Reference is Tree North '~' ~5 ~ ~,~ 6'w' ~'¢TM ~ ,-.~ ~ ,a¢-'~_ ~!~ '~.~' ~-5~- ' ' ~ - ' ' -~/ ~ · .... --L.-_."__ - ,r-~ s~.~hs;~~]~O  · ~ I ~ ~vu '~ 3140.12 S. 5~8Z~l E J " , [~.~ I',D ~7.16~ ~D ~ ~ Tx'D t I I 56~ 0 6~0 7200 s~tio. ~'i~uth= 12~,120' (Tree Nodh) .87~.4C, TbD lB~'q..13 S, g:,.S3£2 E 1 240O Scale: linch = 800fl S- 1 ;.'Lr,'-$[113 IfCY~i.4fl Tvt~ 2371 TI3, 2~)) :¢3 E I ~O0 4800 Vertical Section -2000 -2800 ~ mm -3600 Jl · 44410 ~ Sperry-Sun Drilling Services Proposal Report for S-11A WP2 PrL~dhoe Bay Unit ~eas urs d Depth tncl. Sub-Sea Depth (fl) Vertical Depth 9147,09 23.195 150.'[83 8549,35 8615.75 9187,00 :27.751 146.659 8585.45 865 t.85 9188,75 28.117 146.404 8587.00 8653.40 9200.00 30.480 144.895 8596.8 ! 8663.21 9300.00 51,899 137.035 8671.68 8738.08 9400.00 73.594- 132.888 8717.21 8783.61 9462.04- 87.093 130.831 8727.59 8793.99 9500.00 87,093 130.831 8729.52 8795.92 9587.8~ 87,093 330,831 8733.97 8890.37 9600.00 87.917 129. 931 8734.50 a 800.90 9700.00 94-.674 122,553 8732.24 8798.64 9723.52 96.256 120.804 8730.00 8796.40 9731.73' 96.994 121,165 872.9.05 8795.45 9800.00 96.994 121.165 8720.74 8787.14 9900.09 96.994 '~ 21.168 8708.55 8774.96 10000,09 96.994 ~21.166 8896.39 8762.79 10089,78 98.994 '1'21.'~66 8685.46 8751 10100.00 95.989 120.972 8684 .30 -~8750,70 10200.00 86.166 119.098 8682.42 8748,82 10228,33 83.383 118.564 8685.00 8751.40 '[ 024-7.90 81,6,58 119.496 8687.55 8753.95 '[ 0300.00 81. 658 119.496 8695.1 ! 8761.51 10400.00 81.658 119.496 8709.62 8776.02 10500.00 81.658 119.496 8724`'12 8790.52 10536.10 81.658 119,496 8729.36 8795.76 Loca! Coordinates Northings Eastings (ft) (fi) ~5.53.87 S 'I685.54 E '~ 568,49 S 1694.58 E 1569,18 S '[695.03 E 1573.72 S 1698.14- E 1623.88 S 1740.06 E 1686.08 S 1802.79 E 1726.78 S 1848.25 E 175 ~.57 S 1876.94 E 1808.90 S 1943.29 E 1816.80 S 1952.57 E 1875.83 S 2033.09 E 1888..[3 S 2053.02 E 1892.33 S 2(}60,01 E 1927.39 S 2117,99 E 1978.76 S 22(~2,92 E 2030.13 S 2287.85 E 2076,24 S 2364.09 E 2081.48 S 2372.80 E 2131.46 S 2459.25 E 2145.07 S 2483.98 E 2154,48 S 2500.92 E 2179.86 S 2545.79 E 2228.58 S 2631.91 E 2277.29 S :2718.03 E 2294,88 S 2749.t2 E 25 Seplernber, 1998 - 12:22 Global Coordinates Dogleg Vertical Northin§s Eastings Rate Section (fi) (/t) (°/10Off) (ft) 5978328.33 N 621727.22 E 2246.06 5978313,85 N 621736.49 E 12,000 2261.36 5978313.18 N 621736.95 E 22,000 2262.10 5978208.68 N 621740.13 E 22.000 2267.11 5978259.20 N 621782.85 E 22.000 2328.9; 5978198.02 N 621846.57 E 22.000 2414.77 5978158.05 N 62f892.68 E 22.000 2474.72 5978133.72 N 62~921.75 E 0,000 2_512.09 5978077.46 N 621989.02 E 0.000 2598.52 5978069.71 N 62.1998.42 E 10.000 2610.55 59780'[1.98 N 622079.88 E 10.000 2709.99 5978000.00 N 6:22100.00 E '[ 0.000 2733.41 5977995.94 N 822107.06 E ~0.000 274-1.56 5977961.78 N 622185.59 E 0.000 2809.32 5977911.78 N 622251,33 E 0.000 2908.5.8 5977861.78 N 622_337.08 E 0.000 3007.83 5977816.90 N 622414,04 E D.000 3096.93 5977811.79 N 622422,84 E 10.000 3107.10 5977768.21 N 622510.07 E 10.000 3206.94. 5977750.00 N 622535.00 E 10,000 3235.12 5977740.86 N 622552.12 E 10.000 3254.51 5977716.20 N 622597.38 E 0.090 3306.04 5977668.87 N 622684.27 E 0.000 3404.94 5977621.54 N 622771.16 E 0.O00 3503.85 5977604,45 N 622802.53 E 0,(100 3~9.55 Alaska State Plane Zone, PBU WOA S Pat -- Comment KOP - Starl Di~' @ I2.000"/100L~ - 91.47.00ff MD, 8615.75ft TVD Dir Rate In,ease ~ 22.000°/100ft ' 9'~87.001t MD, 8651,85ft-FVD TSHU End Oil', Sail @ 87.093° · 9462.04ft MD, 8793.99ft TVO Start D$r @ 10.000°/100~t - 9587.81ff MD, 8800.37[f TVD Confir~ue Dir @ t0.000"/100ft- 9723,5211 MD, 8796,40Jt TVD Target: S-11/M-30 T1, Geo:ogicaJ End Dir, SaiJ @ 96.994" - 9731.75¢1 MD, 8795.45ft '[-VD Slarl Dir @ 10,000°/100[-1, · 10089.76ff MD, 8751.86ft TVD Cor~tlnue D]r @ 10.6~01)°/100it ' 10228.33ft MD, 8751.40fl 'rVD Target: S-11/M-30 T2, Geological Er~d Oir, Sail @ 81.658° ' 10247.90[t MD, 8753,95ft TVD Start Dir @ 10.000°/300¢t - 10536.10fl MD, 8795.76ff ]-VD Cont/nued... DrifjQuest Sperry-Sun Drilling Services Proposal Report for S-11A WP2 Prudhoe Bay Unit Measured Depth Incl. Az]ri1. Sub-Sea Depth Veal[cai Depth 1060o.00 87.755 117.577 8735.25 8801.65 lO7(1o.0o 97.300 t 14.589 8730.85 8797.25 lO7(16.41 97.912 114.395 8730.00 8795.40 10800.(10 99,669 123.698 87'[5.67 8782.07 10805,90 99,772 124.287 87~ 4.67 8781.07 10900.0o 99.772 124.287 8698.70 8765.10 10963.03 99.772 124.287 8688.00 8754.40 1 I000.00 98.276 120.058 8682.20 8748.60 11100.00 94.031 108.766 8671.45 8737,85 11200.00 89.6~3 97.593 8 668.24 8734.64 11259.77 87.000 90.918 8670.00 8736,40 1 ~293.99 82.984 90.057 8672, 99 8739,39 11500.00 82.984 90.057 8673,72 8740.12 11400.00 82.984 90.057 8685,94 8752.34 11500.00 82.984 90.057 8698,15 8764.55 11600.00 82.984 90, 057 8710.36 8776.76 11628.87 82.984 90,057 8713.89 8780.29 ! 1700.00 89.475 92.975 8718.57 ~784.97 11772.93 96.132 95.960 8715.00 878~.40 i 18g0.g0 95.972 93.243 8712.15 8778.55 11816.80 95.866 91.557 8710.41 8776.81 t 1900.00 95.866 91.557 8701.9'[ 8768.31 12000.00 95,866 91.557 8691.69 8758.09 12070.30 95.866 91.557 8684.50 8750.90 12100.00 94.610 94.260 B68'[.79 8748.19 Local Coordinates Northings East[rigs (fi) (~t) 2325.25 $ 2804.99 E 2369.13 S 2894.60 E 2371.77 S 2900.38 E 2416.60 S 2981.15 E 2419.85 S 2985.97 E 2472.09 S 3062,59 E 2507.09 S 3113,91 E 2526.52 S 3144,81 E 2567.50 S 3235.19 E 2590.23 S ;:3332.33 E 2594.67 S 3391,87 E 2594.96 S 3425.95 E 2594.96 S 3431.92 E 2595.06 S 3531.37 E 2595.16 S 3630.42 E 2595.26 S 3729.67 E 2595.29 S 3758.32 E 2597.17 S 3~29.23 E 2602.84 S 3901.81 E 2605.00 S 3928.63 E 2605.70 S 3945.33 E 2607.94 S 4028.06 E 2610.65 S 4127.50 E 2612.55 S 4.t97.40 E 2614.05 S 4.226.94 E Global Coordinates Dogleg Vertica] North[ngs Eastings Rate Section (fi) (ft) (°/~ OOft) (fi) 5977574.98 N 622858.88 E 10.000 3603.08 5977532.54 N 622949.18 E 10.0P_,'0 3702.47 5977530.00 N 622955.00 E 10.000 3708.78 5977486.46 N 623036.48 E 10.{300 3801.10 5977483.29 N 623041.35 E 10.000 3806.91 5977432.28 N 623118.80 E 0.000 :3899.50 5977398.12 N 623170.66 E 0.000 3961.52 5977379.18 N 623201.88 E t2.000 3998.02 5977339.65 N 623292_91 E 12.000 4096.57 5977318.48 N 623390.40 E 12.000 4191.48 5977315.00 N 623450.00 E 12.000 4244.74 59773f5.26 N 623484.08 E 12.000 4274.07 59773t5.34 N 623490.05 E 0.000 4279.18 5977316.84 N 623589.29 E 0.000 4364.20 5977318.33 N 623688.53 E 0.00O 4449.~ 5977319.82. N 623787.77 E 0.000 4.534.24 5977320.25 N 623816.¢1 E 0.000 4558.78 5977319.50 N 623887.34 E 10.000 4620.46 5977315.00 N 623960.00 E 10.000 4685.53 5977313.27 N 623986.86 E 10.000 4709.60 5977312.84 N 624003.56 E 10.0q)O 4724-.25 5977311.91 N 624086.32 E 0.OOO 4796.24 5977310.80 N 62418.5.79 E 0.O00 4882.77 5977310.02 N 6242.55,72 E 0.0(Ia 4943.59 5977309.00 N 62428.5.28 E 10,000 4969.66 Alaska State Plane Zone 4 PBU WOA S Pad Comment Continue D[r @ lO,000°/100ft - -ro706.41ft MD, 8796..40ft TVD Target S-11YM-30 T3, Geological End Dir, Sail @ 99.772° · 108,'JS.90ft MD, 8781.07~1TVD Stall: Dir @ 12.00D°/100Q ' 10963.03['1: MD, 8754.40ft ']'VD Continue Dir @ 12.000°/100Jt: 11259.7-711 MD, 8736.40ft TVD T~trget: S-1 l/M,-,.30 TS, Geolc..gical End Dir, Sail @ 82.9134" ' 11'293.99tt M D, 8739.3°Jft TVO Slar~ Dir @ 10.0OO°/1O0ft: 1 [628.87fl MD, 8'780.2.9~t TVD Continue Dir @ lO.O00°ll00ft: 11772.93ft MD, 8781.40~t'lWD Tazge1:S-11/M-30 TS, Geological End Dir, Sail @ 9-5,866": 11816.80ft MD, 8776.81ft TVD Start D.~r @ 10.000"llOC./f-t ' 12070.30f1 MD, 8750.901't TVD Continued... 25 September, 1998- 12:23 Sperry-Sun Drilling Services Proposal Report for S-11A WP2 Prudhoe Bay Unit M easu red Depth Incl, Sub.,Sea Depth Vertical Local Coordinates Depth Nor~hings Eastings (ft) (ft) 12200.00 90,321 103.304 8677.48 8743.88 12289.67 86,465 11 t .405 8BB0.00 8746.40 12300.00 85,897 110.541 8660.69 87¢7.09 12346.36 83.357 106.644 8 F:~5,03 8751,43 12400.00 83.357 106.644 8691 .:24 8757.64 12500.00 83.357 106.644 8702,80 8769.20 I2550.B0 83.357 106.644 8708.68 8775.(~8 12600.00 86.053 110,T76 8713;22 8779.62 12700.00 91.580 119.116 8715.2.9 8781.69 12760.10 95.988 125,1~20 8710,00 8776.40 128~).G0 93.999 125,758 8708°27 8774.67 128~0.13 93.986 125,758 8708.26 8774.66 12900.00 93.986 125.758 8701.32 8767.72 13009.00 93.986 125.759 8694..36 8760.76 13100.00 93.986 125.759 8687.41 8753.81 13200.00 93.986 125.758 8680.46 874 6.86 13258.16 93.986 '~25.758 8676.42 .874:2.82 13300.00 89.976 126.951 8674.97 ~741.37 13305.63 89.436 127.11 ~J 8675.00 8741.40 13340.69 87,8;71 123.973 8675.82 8742.22 13400.00 87.871 f 23.973 8678.03 8744.43 13500.00 87.671 ~23.973 8681.7.4 874~1.14 13600.00 87.671 '[23.973 8685.46 8751,86 13629.80 87.671 I23.973 8686.57 8752.97 ~3700.00 91.C07 130.255 8687.25 8753.65 2629.30 S 4325.55 E 2656.00 S 441 'J .02 E 26,59.69 S 4420.64 E 2674.41 S 4464.38 E 2689.6'7 S 4515.43 E 2716.12 S 4610.59 E 273:2.57 S 4 658.94 E 2748.2.8 S 4705.32 E 2790.41 S 4795.86 E 2833.27 S 4863.24, E 2844.86 S 4879.32 £ 2844.94 S 4879.42 E 2903.16 S 4960.27 E 2961.4,5 S 5041.22 E 3019.74 S 512_2.18 E 3078.04 S 5203.13 E 3I I'[.95 S 5250.2.2 E 3136.73 S 52.83.88 E 3140.12 S 5288.38 E 3160.49 S 5316.90 E 3193.61 S 5366.04 E 324 9.45 S 5448,92 E 3305.29 S 5531,79 E 3321.93 S 5556.48 E 3364.26 S 5612.43 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (fl) (°/100ft) (ft) 5977295.33 N 624384,12 E 10.000 5061.95 5977270.00 N 624470,00 E f 0.000 5~48.92 5977265,47 N 624479.68 E 't0.O00 5159.07 5977252,45 N 624523.65 E I 0.000 5204.12 5977238.01 N 624574.93 E 0.000 5255.70 5977211.09 N 624670.54 E O.0Cg) 5351.88 5977197.41 N 624.719.12 E 0.O(N) 5400.74 5977~82.44 N 624765.74 E 10.000 5448.57 5977114L78 N 624856.94 E 10.O00 5547.84 59771100.00 N 624926.00 E 10.0~0 5627.68 5977088.67 N 624941.26 E 10.000 5647.44 5977088.59 N 62494'[.37 E 10.0-00 5647.57 5977031.68 N 6'25023.14 E 0.0 O0 5746.87 5976974.68 N 625105.02 E 0.000 5846.30 59769~7.69 N 625186.89 E 0.000 5945,73 5976860.70 N 625268.77 E 0.000 6045.16 5976827.56 N 625316..39 E 0.000 6102.99 5976803.32 N 62.5350.45 E 10.000 6144.62 5976800.00 N 6~,00 E ]0.000 6150.22 5976760.09 N 625.,.':q~3,84 E 10.000 6185.I7 5976747.76 N 62.54,,'43,51 E 0.000 6244.36 5976693,25 N 625517.27 E 0.000 6344.16 5976638,75 Iq 625601.03 E 0.000 6443.97 . 59766:22.51 N 625625,98 E 0.000 6473.7I 5976581 .OB N 625682.60 E 10.000 6543.48 Alaska State Plane Zone 4 PBU WOA S Pad -- Common! ConlirtL[e Dir @ 10.000"/10Oft - 12289.67ff MD, 8746.40~TVD Target: S-11/~,4-30 T6, GeoJogical End Dirj Sail @ 83.357" ' 12346.37ff MD, 8751.43ft TVD Slart Dir i~ lO.0O0°/100ft ' 12550.80fl ,MD, 8775.081:t TVD Cor~tlnue Dir @ 10.000<'/100~t: 12780,1 Oft MD, 8776.40ft 3'VD Ta~gel: S-11/M.-30 I7, Geelc~ical End DIr, Sail ~' 93,986°' 12600.t3tt MD, 8774.6b-Tt TVD Start D[r @ 10.000"/100It: 13258.16ft MD, 11742.82tt-I'VD Conlrn~e Dir @ 10.000"/10Oft: 13305.63fl MD, 6741.40tt 'I-VD Tar§et: S-I 1/M-30 TS, Geological End Dir, Sail @ 87.871"- 13340.69[t MD, 8742.22ft 7'VD Slall Dir @ lO.000°/100ft: 13629.8011 MD, 8752.97ft TVD Con~'nued. . . 2E $gpternber, 1998 - 12:23 - 3 - Dri~iQuest Sperry-Sun Drilling Services Proposal Report for S-1 lA WP2 Prudhoe Bay Unit Measured Sub. Sea Vertical Local Coo rdinates Depth Incl, Az[m, Depth Depth Northings Eastings (fi) (fi) (fi) (~) Global Coordinates Dogleg Vertical N crt hing s Eastin gs Rate Section (fi) (fi) (°/100fi) I3800.00 95.443 139,233 8681 .b'-'2: 8748.02 3434.44 S 5683,28 E 't3816.02 96.I45 140.681 8680.00 8746.40 3446.65 S 5693,52 E 13900.0D 99.806 148.314 8668,33 8734.73 351427 S 5741.79 E 1398,3.12 103.258 156.0:33 8651.70 8718.10 358821 S 5779.80 E 13983.16 103.260 I56.0~36 8651.69 8718,09 ~':t586,24 S 5779.81 E 1400~.00 103.260 I56.036 8647.82 8714.22 3601,22S 5786,47 E 14042.25 103.260 I56.036 8638.13 8704.53 3638.61 S 5803,18 E 14042.28 103.257 156.035 8638.13 8704,53 3638.83 S 5803.19 E 14100.00 97.657 154.612 8627.65 8694.05 3690.38 S 5826.88 E 14.200.00 87.947 152.219 8622.77 8689.17 3779,59 S 5871.53 E 14234-.36 84.610 151.396 8625.00 8691.40 3809,80 S 5887.73 E 14300.00 84.610 151.396 8631.'[7 8697.57 3867.18 S 5919.03 E 14400.00 84.610 151.396 86.40.56 8706.96 3954.58 S 5966.67 E 14500.00 84.6 t0 151.396 8649.95 87t6.35 404~.99 S 6014.34- E '[4600.00 64.610 151.396 8659.35 8725.75 4129.40 S 6062.00 E 14700.00 84.610 151.396 8668.74 8735.14 4216.80 S 6109.66 E 14713.40 64.610 151.396 8670.00 .8736.40 4228.52 S 6116.05 E 5976512.04- N 625754,55 E lO.0,0'0 6640.40 5976500.00 N 625765.00 E 10.000 8655.48 5976433.16 N 625814.35 E I0.000 6731.76 5976361.84- N 625853,51 E 10.000 6801.48 5976,361.80 N 625853,52 E -~ 0.000 680'1'.51 5976346.93 N 625860.42 E 0.000 6614.95 5976309.62 N 625877.72 E 0.000 6648.67 5976309.60 N 625877.73 E 10.000 6848.70 5976258.zk3 N 625902.25 E 10.000 6895.62 5976~69.95 N 625948.32 E 10.000 697:9.95 597~140.00 r~ 625965.00 E 10.1300 7009.43 5976083.14 N 625997.20 E 0.000 7065.87 5975996,50 N 626046.26 E 0.000 7151,85 5975909,87 N 626095.3I E 0.000 7237.82 5975823.24 N 626144.37 E O.00D 7323.80 5975736.61 N 626193.43 E 0.00O 7409.78 5975725.00 N 626200.00 E 0.000 7421.30 Ali data is in feet unless otherwise stated. Directions and coordinates are relative to True Nodh. Vertical depths are relative to Well Northings and Eastings are relative to Well The Dogleg Severity is in Degrees per 100ft. Vertical Section is from WeJl and calculated along an Azimuth oi 121.~20° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14713.40ff., The Bottom Hole Displacement is 7435.48ft., in the Direction of I24.659° (True). Alaska State Plane Zone, PBU_WOA S Pa( Comment Con[inue Dir @ 10.0O0°/'[00ft · 13816.02ft MDj 8746.40ft TVD Target: S-11/M-3D Tg, GeoJogical End Dir, Sail @ I03.258" - ~3983.12tt MD, 8718.t0rt TVD Slart Dir @ 10.000°/'[00ft- 14842,28[t MD, 8704-.531t'l'VD End DIr,_Sail @ 84.610": 14234.36fi MD, 8691,40it 'FVD Target: S-11/M-30 'fl0, Geolc<jicaJ 4 1~' Liner Target: S-1 l/M-30 T11, Geological Co/Tt~nued... 25 Sep fember, 1998 - 12:2.3 - 4 - DrillQues! I We,, Name: { S-11Ai I Sidetrack Plan Summary Type of Redrill (producer or injector): I Injector Surface Location- X=620,017 Y=5,979,855 FNL: 1645', FWL: 1854', Target 1 Location: Bottom Hole Location: I Sec. 35, T12N, R12E, UM X=622,100 Y=5,978,000 FNL: 3534', FWL: 3905', Section 35, T12N, R12E X=626,200 Y=5,975,725 FNL: 597', FWL:2686', Section 01, T11N, R12E I AFE Number: 14P1212 I Estimated Start Date: I 11-15-98 I Rig: I Nabors 7ES Operating days to complete: I 26 IMD: I14,713 I ITvDss I8670' I IRKB ~64.9' I Well Design (conventional, slimhole, etc.): I Ultra-slimhole Extended Horizontal Side-track IObjective: I The extended horizontal sidetrack of S-11i will replace the current M-30i injection and the I current M-13i injection. Mud Program Production Hole (6" hole) Section: 6 % QUICKDRILn I Density, PPg I FunnelVis, sec I LSRYP LSRVI 8.7 - 8.8 45 -55 NA 55000-75000 Keep Sand content at less than 0.25% in the production interval pH I HPHT FL, cc 8.5 - 9.0 I NC Directional KOP: 9,147' MD Maximum Hole Angle: 103.3° Close Approach Wells: M-06i M-13 M-19 M-30 382'@ 11,801'MD 629'@ 14550' MD 550'@ 13,463' MD 640'@ 11,249' MD Alaska 0il & Gas Cons. (;0m~tssion Anchorage Formation Markers Formation Tops MD TVD (SS) TSAG 9,146' 8547' KOP will be at 9,147'MD; 8548'TVDSS TSHUB 9,198' 8587' TSAD 9,285' 8675' Zone 4 9,285' 8675' Target Zone Target Polygon Start 9,723' 8730' TD 14,713' 8670' Zone 3 8854' Not penetrated Zone 2 Not penetrated HOT 8952 Not penetrated OOWC 8999 Not penetrated Casing/Tubing Program Hole Size Csg WtJFt Grade Conn Length Top Btm MD/TVD MD/I'VD Existing 13-3/8" 72# L-80 BTRS 2,679' Surface 2,679'/2,678' Existing 9-5/8" 47# L-80 BTRS 9,136' Surface 9,136'/8,605' Existing 7" 26# L-80 BTRS 1,468' 8,627'/8,144' 10,004'/9,414' 6" 4.5" 12.6# L-80 IBT-MOD 5,716' 8,997'/8,482' 14,713'/8,736' Tubing 4.5" 12.62# L-80 NSCT 8,997' Surface 8,997'/8,482' Cement Lead Cement Tail Cement Casing/Liner Sx / Wt / Yield Sx / Wt / Yield Comments P&A 63/15.8/1.15 Pre-Rig will P&A and displace cement to place TOC -9,100' MD, -188' above top perf. 4-1/2" 665/15.8/1.15 Solid Cemented Liner, 15.8 ppg Class "G", TOC to 200' above liner top @ -8,797'MD Volume assumptions: Gauge hole + 50% excess(Production Hole); 80' shoe joints; TOC as listed. Loclclincl Proclram ILo~ls: 6" Hole DPC Logs: Existing CBL: MWD/GR/RES from Horizontal to TD. DPC logs will be run after landing well horizontal. Existing 1982 CBL shows good cement bond 182' MD above the proposed KOP/Window point. Well Control Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and will be capable of handling maximum potential surface pressures. Bottom hole pressure is expected to be 3450 psi @ 8675' tvdss. Maximum expected surface pressure at 8675' tvdss is 2582 psi (assuming gas column of 0.1 psi/fi) Diverter, and BOPE schematics on file with AOGCC. Hazards S-Pad is not classified as a H2S drillsite. Stuck pipe while drilling the Kingak has been reported in offset wells, however, the Kingak will not be penetrated. Lost circulation has been reported in the Sag River, Shublik and Ivishak production intervals. Three to five minor 10'-30' faults will be crossed in the polygon. Only minor losses are expected, however, potential for higher losses is possible and will need to be monitored closely. Shallow gas (Ugnu, W. Sak) will not be penetrated. Put River (gas) will not be penetrated. Kingak will not be penetrated. Disposal Cuttings should be hauled to the ball mill at CC-2A. Fluid Handling: Haul all drilling and completion fluids and other class II wastes to CC-2A for injection. Haul all Class I wastes to Pad 3 for disposal. In addition, haul all cuttings from drilling operations to CC-2A for disposal. S-11Al Summary of Operations Pre-Rig Operations: The objective of the pre-rig work is to ascertain the condition of the 9 5/8" casing presently in the hole; P&A the existing perforations; chemical cut existing tubing in the first joint above production packer; and test the 9 5/8" pack offs. 1. Notify AOGCC of initiation prior to commencing any P&A operations. 2. NU on Well. 3. Bullhead Seawater down tubing to kill well and establish injectivity. 4. Perform_~.on 9 5/8" casing and 5 ~" tbg to 3000 psi. IA/OA. 5. RIH with CTU, spot cement (83 sks; 12 bbl plus 5 bbls for squeeze.) from 9417'MD to place TOC at -9100' MD. 6. Pressure test against cement to 3000 psi, testing the 9 5/8", 7" and liner top. 7. RIH with 4 7/16" chemical cutter and chemically cut 5 ½" tubing @ -8564' MD (middle of 5 1/2" 39' jt. above 9 5/8" Packer.) If the cutter will not go through the sliding sleeve at 8520' MD, then cut in the middle of the 5 Y2" 41' jt. above the sliding sleeve, -8499' MD. Notify Ops. Drilling Eng. if unable to cut tubing @ desired depth. 8. Freeze protect tubing and annulus. 9. Test packoffs on tubing hanger and 9 5/8" casing to 5000 psi (3500 psi on casing packoff if slip type, 5000 psi if mandrel type hanger), and carefully cycle Iockdown screws. Set BPV. 10. Clear location, dig out cellar, remove electrical lines, flow lines, and remove well house. 11. Wells S-35i and S-36i will need to be shut-in for rig move. Please co-ordinate with Bordes/Anglen for timing and if well houses will need to be removed. 12. RDMO Rig 1. 2. 3. 4. 5. 6. 7. 8. Operations The rig will MIRU. Confirm 9 5/8" packoffs tested to 5000 psi during pre-rig. Pull BPV. Circulate out freeze protection and circulate well with seawater. Set TWC and test to 1000psi. ND tree. NU BOP, and test BOP to 250/5000 psi. Pull the tubing to the chemical cut above the production packer @ -8499'MD. Change packoff (if failed in Pre-Rig) after pulling two jts. of tubing, set on storm packer, change and test new packoff. 9. RIH w/Overshot to top of tubing stump and pull K-anchor/SBR free. 10. RIH w/milling assembly; mill packer and retrieve packer/tubing tail. 11. RIH w/6" bit on 4" DP and dress cement top to 9169'MD. 12. Pressure test casing to 4000 psi for 30 mins. 13. RIH and set 7" whipstock/milling assembly and set 25° left of highside. 14. Displace to 6% KCI Quikdriln mud. 15. Mill window to place KOP @ 9,147' MD. 16. POOH and PU 6" kick off assembly with w/MWD/GR drill build & turn to horizontal @ -9,900' MD. 17. PU BHA for horizontal section w/MWD/GR/RES and drill to TD -14,713' MD. 18. Run DPC logs from horizontal through build section. 19. Run 4 ½" L-80 liner and set 7" x 4 Y2" hanger/packer TOL @ -8,997' MD. 20. Cement liner conventionally with 200' above TOL. RIH w/mill and clean out to landing collar if necessary. 21. Pressure test liner to 4000 psi for 30 mins. 22. RIH w/CBL/USIT to confirm cement job quality. 23. Perf as per asset direction -1500'. 24. Complete with no GLMs, an 3 X nipples, and XN nipple on 4-Y2" NSCT tubing and set w/7" x 4 Y2" packer @ -8,947' MD (200' above the Sag. River.) 25. Pressure test tubing to 4000 psi. 26. Freeze protect well. 27. RDMO TREE: 6" CIW S-1 1 i KB. ELEV = 67.80 WELLHEAD: 13-3/8" McEVOY "' ' .... ' BF. ELEV = 39.40 ACTUATOR: OTIS I SSSV LANDING NIPPLE I 2103 9-5/8 DV PACKER 12605 I B ~ (5-1/2" RQM)(4.562" I D) L-80, BTRSI 2679I I ( OTIS W/ RA LATCH) I N° MD(BKB) TVDss i I 13 3109 3039 j j I 12 4598 4456 KOP: 2000' O I MAX ANGLE: 29 , 11 5492 5244 ['-51 10 5987 5688 9 6142 5828 i 8 6553 6202 ! 5-1/2", 17#/ft, L-80, 7 6712 6348 ' BTRS, lPG TUBING 6 7066 6676 TUBING ID: 4.892" 5 7223 6822 CAPACITY: 0.0232 BBL/FT i 4 7760 73O9 ~ 3 7916 7448 ; ! 2 8217 7712 I 8374 7850 OTIS 8520 (4.562" MIN. ID) ~ ~ ~ TUBING SEAL ASSY. 8583 20' BAKER SBR 9-5/8" PACKER ] (BAKER)( 4.00"ID) 8603 J 4-1/2", 12.6#/ft, L-80 I I -- ~ TAILPIPE 7" ]~ ~ (OTIS) (3.813" ID) LINER ~ ~ 4-1/2 .... XN" NIPPLE (OTIS) ( 3.725" ID)· 8683 9-5/8", 47#/ft, 9136 · 8715 L-80, BTRS · BAKER SOS (3.958" ID) ELDM (1-9-84 PERF) PERFORATION SUMMARY REF: LOG: BHCS 6-12-82 SIZE SPF INTERVAL OPEN/SQZ'D[~] .......... NO MARKER JOINT 3-3/8 4 9288-9352 OPEN 3-3/8 I 9352-9363 OPEN 13-3'8 4 9373-9424 I OPEN I I~i/ Expected top of Cmt - 9417' (12/21/94) ! ~-- Top of 20/40 Carb - 9427' 3-3/8 4 9438-9466 OPEN ~ Top of Cmt Cap - 9450' 2-7/8 4 9466-9474 SQZ'D 12/89 2-7/8 I 9489-9526 SQZ'D 12/89 i!!::!?:iii!iiii~iii?:iiiiii~ii~i~i~ii Top Of Carb- 9479' 3-3/8 1 9526-9580 OPEN 7", 26#/ft, L-80, I10004 BTRS DATE REV. BY COMMENTS PRUDHOE BAY UNIT 6-16-82 BIXBY COMPLETED WELL:S-11 ¢33-35-12-131 8-30-89 PCS PUT ON MAC APl NO: 50-029-20728 1-26-94 GSH UPDATE 12/89 SQZ SEC 3~; T12N; R(~12E BERES 9-10-94/12-21/94 LeeH./JKA San~lbiack with Cmt Cap BP Exploration (Alaska GAS LIFT MANDRELS (OTIS W/ RA LATCH) N° MD(BKB) TVDss 13 3109 3039 12 4598 4456 11 5492 5244 10 5987 5688 9 6142 5828 8 6553 6202 7 6712 6348 6 7066 6676 5 7223 6822 4 7760 7309 3 7916 7448 2 8217 7712 I 8374 7850 SIZE SPF INTERVAL OPEN/SQZ'D 3-3/8 4 9288-9352 OPEN 3-3/8 I 9352-9363 OPEN 3-3/8 4 9373-9424 OPEN 3-3/8 4 9438-9466 OPEN 2-7/8 4 9466-9474 SQZ'D 12/89 2-7/8 I 9489-9526 SQZ'D 12/89 3-3/8 1 9526-9580 OPEN S-11i P&A CONDITION L-80, BTRS 2679 KOP: 2000' MAX ANGLE: 29 TOP OF I 8627 -- 7" i~ ~I l LINER , i 9-5/8", 47#/ft, I 9136 I ,~ , · L-80, BTRS PERFORATION SUMMARY ~--- EZSV Set @ 9169 MD i OP EN/SQZ'D SIZE SPF INTERVAL i ! ~ ~-25 bbls Cement Displaced to P&A ' 3-3/8 4 9288-9352 P&A ~ 3-3/8 I 9352-9363 P&A , .',,,~ ,.~ ~.,-~ ..... [ ;:.;;; ~ ';?;~ Exp e cted to p of C mt - 9417' (12/21/94 ) 3-3/8 4 9373-9424 P&A -- Top of 20/40 Garb - 9427' 3-3/8 4 9438-9466 P&A ~ Top of Cmt Cap - 9450' 2-7/8 4 9466-9474 SQZ'D 12/89 2-7/8 I 9489-9526 SQZ'D 12/89 3-3/8 I 9526-9580 P&A iii ~iiii~ i Top Of Garb - 9479' ..................... P B T D [ 9962 I ~ ...~ L o004 I BTRS DATE REV. BY COMMENTS PRUDHOE BAY UNIT 6-16-82 BIXBY COMPLETED WELL:S-11 f33-35-12-1 3~ 8-30-89 PGS PUT ON MAC APl NO: 50-029-20728 1-26-94 GSH UPDATE 12/89 SQZ ~E~ 3~: T12N' RG12E 9-17-98 JAS P~ Condition BP Exploration (Alaska) SIZE SPF INTERVAL OPEN/SQZ'D 3-3/8 4 9288-9352 P&A 3-3/8 I 9352-9363 P&A 3-3/8 4 9373-9424 P&A 3-3/8 4 9438-9466 P&A 2-7/8 4 9466-9474 SQZ'D 12/89 2-7/8 I 9489-9526 SQZ'D 12/89 3-3/8 I 9526-9580 P&A 13-3/8" 72# L-80 BTRS 2,679' MD S-11Ai Sidetrack PROPOSED COMPLETION DESIGN SIDETRACK OUT OF 7" Casing 5 1/2" 17#, NSCT L-80 XO to 4 1/2" + 2200' X Nipple 4-1/2" L-80, 12.6#, NSCT Tubing TOL 7" 8627'MD KOP - 9,147' MD TOC @ + 9,167' MD 4 1/2" Liner centralization: Run Turbolators in the fol- lowing configuration: 2- Righthanded per joint. If Iow dogleg and good hole conditions. Run Straight Blades: 1 per joint if hole conditions warrant. X Nipple 7"x 4 1/2" Production packer @ + 8,947' MD X Nipple and XN Nipple Top of 4-1/2" L-80, 12.6#, IBT-MOD Liner @ + 8,997' MD 9 5/8" 47# L-80 BTRS 9136'MD 4-1/2" Solid cemented liner to TD @ 14,713' MD 7" 26# 10,004' MD Date Revised by Comments 10/21/98JAS Proposed completion PRUDHOE BAY UNIT WELL: S-11Ai _ APl #: 50-029-20728-01 Z Prudho-e Bay Unit Alaska State Plane Zone 4 PBU_WOA S Pad S-11A -2000 ~ ~2c0 - 24.00 320O Sc. al e: q inch = 800ft Shared Services Drilling S-1 lA Wp2 Eastings 2E~4J~? S. 3Jg l~Z ~r f DrillQuesf 4~10 O 56100 64p0 ~ 74 L 4tO TYi9 1/2" Linel 47t3.40 NfD 87L-~.40 TVD i '1 1600 2,4,00 $ca~e:.~W~.~ = 80,Oft ¢~. o~. ~.~S,~1~7 ~ -- ~71 ~S~3)~E I I 3200 s- I t/gl-~o Tto I 64O0 Reference is Tree North S-I ~Ar,<',8 T5 I S-l l/r~230 T~ I [ I 4000 4800 5600 Easti~gs - -2000 - -2800 ~ - .3GOD 4800 56n 0 6400 7200 Vertica! Section Section Azimuth: t21.t20' (True No~th) f Sperry-Sun Drilling Services Proposal Report for S-11A WP2 Prudhoe Bay Unit ~eas ure d Depth tncl. Sub-Sea Vertical Local Coordinates Depth Depth North!rigs Eastings (ft) (fi) (ft) 9147,09 23.195 150.t83 8549,35 8615.75 9187,00 :27.751 146.659 8585.45 865 t .85 9188,75 28.117 146.404 8587.00 8653.40 9200.80 30.480 144.895 8596.81 8663.21 9300.00 51.899 137.035 8671.68 8738~08 9400.00 73.594- 132.888 8717.21 8783.61 9462.04 87.093 130.~31 8727.59 8793.99 9500.00 87.093 130.531 5729.52 8795.92 9587.8~ 87.093 130,531 8733.97 8800.37 9600.00 87.917 129. 931 6734.50 8 B00.90 9700.00 94.674 122,553 8732.24 8798.64 9723.52 96.256 120.804 8730.00 8796.40 9731.73 96.994 121.1 86 872.9.05 8795.45 9800.00 96.994 '[21.166 8720.74 8787,14 99'00.00 96.994 '[21.166 870B.56 8774.~ 10000.01) 96.994 1:21.168 869 6.39 8762.79 10089.76 96.994 I21.166 8685.46 8751 10100.00 95.989 120.972 8684.30 8750,70 10200,00 86.166 1'[9.098 8682,42 8748,82 10228,33 83.383 118.564 8685.00 8751.40 t 0247.90 81.658 119.496 8687.55 8753.95 ~ 0300.00 81,6,58 119.496 8695.1 ! 8761.51 10400.00 81.658 119.496 8709.62 8776.02 10500.00 81,658 119.496 8724`12 8790.52 10536.'[0 81.658 119,496 8729.36 8795.76 ~ 553.87 S 1685.54 E 'I568.49 S 1694.58 E 't 569,18 S 1695.03 E 1573.72 S 1698.14 E 1623.88 S 1740.06 E 1686,08 S 1802.79 E 1726.78 S 1848.25 E 1751.57 S 1876.94 E 1808.90 S 1943.29 E 1816.80 S 1952.57 E 1875.83 S 2033.09 E 1888.13 S 2053.02 E 1892.33 S 2(~60,01 E 1927.39 S 2117,99 E 1978.76 S 2202,92 E 2030.13 S 2287,85 E 2078.24 S 2364.09 E 2081.48 S 2372.80 E 2131.46 S 2459.25 E 2145.07 S 2483.98 E 2154,48 S 2500.92 E 2179.86 S 2545.79 E 2228.58 S 2631.91 E 2277.29 S 2'-/18.03 E 2294`88 S 2749.t2 E Global Coordinates Dogleg Vertical Northi ngs East ings Rate Section (ft) (fl) (°/10Oft) (ft) 5978328.33 N 62 ~727.22 E 2__246.06 5978313,85 N 621736.49 E 12~000 2261.36 5978313.18 N 621736.95 E 22,000 2262.10 5978308.68 N 621740.13 E 22.~)0 2267.11 5978259.20 iq 621782.85 E 22.080 2328.95 5978198.02 N 62~846.57 E 22.000 2414.77 5978158.05 N 62T892.68 E 22.000 2474.72 5978133.72 N 621921.75 E 0.000 2512.09 5978077.46 N 621989.02 E 0.000 2596.52 5978069.71 N 62.1998.42 E 10.000 2610.55 59780'[1.98 N 622079.88 E ~0.000 2709.99 5978000.00 N 6:22100.00 E I0.000 2733.41 597-/995.9I N 622107.06 E 'f0.000 2741 597796!.78 N 622165.59 E 0.000 2809.32 5977911.78 N 622251.33 E 0.000 2908,58 5977861.7B N 622337,08 E O.OOO 3007.83 5977816.90 N 622414,04 E O.000 3096.93 5977811.79 N 622422,84 E 10.000 3107.10 59777L~,21 N 622510,07 E 10.000 3206.94. 5977750.00 N 622535.00 E 10,000 3235.12 5977740,88 N 622552.12 E 10,000 3254.5I 5977716.20 N 622597,38 E O,OOD 3306.04- 5977668.87 N 622684.27 E O,OOO 3404.94 5977621.54 N 622771.16 E 0.00O 3503.85 5977604,45 N 622802.53 E 0.I)60 3539.55 Alaska State Plane Zone 4 PBU_WOA S Pad Comment KOP' Starl Db @ 12.000~/1000 - 9147.00ff MD, 8615.75ft TVD Dir Rate increase 6' 22.000°I100ft' 9187.00fl MD, 8651,85ftTVD TSHU End Dir, Sail @ 87.093° ' 9462.04ft MD, 8793,99ft TVO Start D]r @ 10.000°/100[-t ' 9587,8lft MD, 8800.37[~ 7"VD Conlinue Dir @ t0.000°/1O0ft: 9723,52ft MD, 8796,40~TVD Target: S-I t/M-30 T1, Geo;ogical End Dir, SaiJ @ 96.994~ - 973!.7:3[1 MD, 8795.45ft TVD Slarl Dir @ 10,000°/1~0ft ' 10089.76ff MDt 8751.86ff l-VD Continue D]r @ 10.000°/100ft' 102__2_8.33ft MD, 875t.40fl TVD Target: S-11/M-30 T2, Geological End [}ir, Sail ~ 81.658° ' 10247.9~fl MD, 8753,95ft TVD Start Dk @ 10.000"/100E ' 10536.10fl MD, 8795.76ft TVD ConEnoed. . . 25 Sep~eraber, I998 - 12:22 Drifft~ue~t Sperry-Sun Drilling Services Proposal Report for S-11A WP2 Prudhoe Bay Unit Measured Depth Incl. AzUre. S ub-Sea Depth (it) Vert [cai Lo ca [ Coordi nates Depth No rth ings Eastrn gs (fi) (it) fit) 10699.00 87.755 117.577 8735.25 8801.65 07~)o. Oo 97.300 1:14.589 8730.85 8797.25 0706.41 97.912 114.395 8730.00 8795.40 0800,(]0 99,669 123.698 87I 5.67 8782.07 0805,90 9:9,772 124.287 87t 4.67 8781.07 0900.00 99.772 124.287 8898.70 8765.10 0963.03 99.772 124.287 8688.00 8754.40 1000.00 98.276 120.058 8682.20 8748.60 '[ 10ri.00 94.031 108.766 8671,45 8737,85 '[ 200.00 89.633 97.59;3 8 668,24 8734,64 1259.77 87.000 90.918 8670.00 8736,40 1;293.99 82.984 90.057 8672, 99 8739,39 1500.00 82.984 90.057 8673.72 8740,12 1400.00 82.984 :90.057 8685,94 8752.34- 1500.00 82.984 90.057 8698,15 8764.55 1600.00 82.984 90,057 8710.36 8776.76 1626.87 82.984 90,057 8713.&9 8780.29 17e0.00 89.475 92,975 8718.57 8784.97 ! 1772.93 96.1.32 95.960 8715.00 8781:.40 '~ 1800.60 95.972 93,243 8712.15 8778.55 11816.80 95.866 91.557 8710.4'f 87'76.81 1:1900,00 95.866 91,557 8701.91: 8768.31 I2000,00 95,866 91.55'7 8691.69 8758.09 2070.30 95.866 91.557 8684.50 8750.90 2100.00 94,610 94.2F:K) 868'[.79 8748.19 2325,25 S; 2804.99 E 23 69.13 S 2894.60 E 2371.77 S 2900,38 E 24-16.60 S 2981.15 E 24-19,85 S 2985,97 E 2¢72,09 S 3062,59 E 2507.09 S 3113,91 E 2526.52 S 3144.81 E 2567.60 S 3235.19 E 2590.23 S 3332.33 E 2594-,67 S 3391.87 E 2594.96 S 3425.95 E 2594.96 S 3431.92 E 2595.06 S 3531.t7 E 2595.l 6 S 3630.42 E 2595.26 S 3729.67 E :2595,29 S 3758.32 E 2597.17 S 31~29.23 E 2602.84 S 3901.81 E 2605.00 S 3928.63 E 2605.70 S 3945.33 E 2607.94 S 4028.06 E 2610.65 S 4127.50 E 2612,55 S 4t97.40 E 2614.05 S 4226.94 E Global Coordinates Dogte.~ Vertical North[ngs Eastings Rate Section (fi) (fi) (°/lOOff) (ft) 5977574.98 N 622858.88 E 10.00'0 3603.08 5977532Z54 N 622949.18 E 10.0~/0 3702,47 5977530.00 N 622955.00 E 1O.O¢_K) 3708.78 5977488.46 N 623036A8 E 10.0'[~3 3801.10 5977483.29 N 623041.35 E 10.0{)0 3806.91 5977432.28 N 623118.80 E 0.000 3899.50 5977398,12 N 623170,6;6 E 0.000 3961.52 5977379.18 N 623201.88 E t2.000 3996.02 5977339.65 iq 623292.91 E 12.000 4096.57 5977318,48 N 623390.40 E 12.000 4191.48 5977315.00 N 6234-50.00 E 12.000 4244.74 5977315.26 N 623484.08 E 12.000 4274.07 5977315.34 N 623490.05 E 0.000 4279.18 5977316.84 N 623589.29 E O.00O 4364,20 5977318.33 N 623688.53 E 0.000 4449.~ 5977319.82 N 623787.77 E O.O00 4534,24 5977320.25 N 623816.41 E 0,000 4558.78 5977319.50 N 623887.34 E 10.000 4620.46 5977315.00 N 623960.00 E 10.000 4885.5'J 5977313.27 N 623986.86 E 10,00,0 4709,60 5977312.84 N 624803.56 E 10,(~0 4724.25 5977311.91 N 624886.32 E 0.O.0O 4796.24 5977'310.80 N 624185.79 E 0,0043 4882.77 5977310.0~ N 62¢2.5.5,72 E 0.000 494-3.59 5977309.00 N 624285.28 E '[0.000 4969.66 Alaska State Plane Zone 4 PBU WOA S Pad -- Comment Continue D[r @ 10,000°/100ff - 10706.41ft MD, 8798.40ft 3'VD TaJrge~ S-11JM-30 T3, Geological End Di r, Sa~l @ 99.T/2° · 10805.~Of-t MD, 8781.07fl TVD Start Dir @ 12.000"11000 - 10963.03ft MD, 8754.4/Jff ']-VD Continue Dir @ 12.0000/100ft- 11259,77tt MD, 8736.40ft TVD T~rget: S-1 l/M-,30 T4., Geo[czjic.~l End Dir, S;ril @ 82.984° - 1 I293.99ft M D, 8739.394t TVD Slar~ Dir @ 10.00O°ll00ft- 1 ! 628,87ft MD, 8780~.9ft TV D Continue Dir @ 10,0~0°ll00ft ' 11772.93ft MD, 8781.40[t'I-VD Ta~gel: S-111M-30 TS, Geological End Dir, Sail @ 95,866° · 11816.8.0ft MD, 8776.$1ff TVD Start Dir @ 10.000"I! Or_~ft - 12070.30ft MD, 8750.90ft TVD Conl. fnzxed... o 25 September, 1998 - 12:23 .2 - Drift Sperry-Sun Drilling Services Proposal Report for S-11A WP2 z Prudhoe Bay Unit easu red Depth (ft) Incl, Azirn, Sub-Sea Depth (fl) Vertical Depth 12200.00 90.321 103.304 8677.48 8743.88 12289.67 86.466 11 t.405 8680.00 8746.40 12300.00 85,897 110.541 8680.69 8747.09 12346.36 83.357 106.644 8 F::~5.03 8751,43 12400.00 83.357 106.644 8691.24 8757.64 12500.00 83.357 106.644 8702, 60 8769.20 12550J~0 83.357 106.644 8708.68 8775.08 12600.00 86.053 110,778 8713,22 8779.62. I2700.00 91.580 119.116 8715.29 8781.69 12780.10 95.988 125,820 8710,00 8776.40 12800.00 93.999 125,758 8708.27 8774.67 12560.13 93.986 125,758 8708.26 8774.66 12..q~'0.O0 93.986 125,758 8701.32 8767.72 13009.00 93.986 125,75.1] 6694.36 8760.76 13100.00 93.986 125.759 8687.41 8753.8 ! 13200.00 93.986 125,758 8680.46 874 6.86 13258,16 93.986 t25.758 8676.42 8742.82 13300.00 89.976 126.951 8674.97 8741.37 13305.63 89.436 127.111 8675,00 8741.40 13340.69 87,8'71 123.973 8675.82 8742,22 13400.00 87.871 ~ 23.973 8678.03 8744,43 13500.00 87,871 '[23.973 8681.74 874a~14 13600.00 87,871 ~23.973 8685.46 8751.86 13629.80 87.871 '[23.973 8686.57 8752.97 13700.00 91.C07 130.255 8687.25 8753.65 Local Coordinates Norfhings Eastlngs (ft) eft) 2529.30 S 4325.55 E 2656.00 s 4411,02 E 2659.69 S 4420,64 E 2674A1 S 4464.38 E 2689.b-'7 S 4515.43 E 271&.1:2 S 4610.59 E 2732.57 S zl658.94 E 274828 S 4705.32 E 2790.41 S 4795.86 E 2833.27 S 4863.24 F_ 2844-,86 $ 4879.32 E 2844.94 S 4879.42 E 2903,16 S 4960.27 E 2961.45 S 5041.22 E 3019.74 S 5122.18 E 3078.04 S 5203.13 E 3I 1:1.95 S 52502.2 E 3136.73 S 5283.B8 E 3140.12 S 5288.38 E 3160.49 S 5316.90 E 3193.61 S 5366,04 E 324 9.45 S 5448,92 E 3305.29 S 5531,79 E 3321.93 S 5556,48 E 3354.26 S 5612.43 E Global Coordinates Do§leg Vertical Northings Eastings Rate Section (fi) (ft) (°/100ft) (fl) 5977295.33 N 624384,12 E 10.000 5061.95 5977270.i30 N 624470,O0 E ~0.000 5146.92 5977266,47 N 624479,65 E '~0.O00 5'~59.07 5977252,45 N 624523,65 E I 0.0O0 5204.12 5977238.01 N 624574.93 E 0~D00 5255.70 5977211.0:9 N 624670.54 E 0.0O0 5351 5977197.4.1 N 624719.12 E 0.D00 5400.74 5977382.44 N 624765.74 E 10.000 5448.57 5977141.78 N 624856.94 E 10.OEN) 5547.54 5977100.00 Iq 624925.00 E 10.O0~ 5627.68 5977088.67 N 624941.26 E 10,000 5647.44 5977088.59 N 62494"[.37 :F 10.O00 5647.57 5977031.68 N 625023.14 E 0.000 5746.87 5976974.68 N 625105.02 E 0.Od0 5~46.30 5976917.69 N 625186.89 E O.0O0 5945.73 5976860.70 N 625268.77 E O.0O0 6045.16 5976827.56 N 625316.S§ E 0.00O 6102.99 5976803.32 N 62.5350.45 E 10.000 6144.62 5978800.00 N 625355.00 E 10.0Od 6150.22 59767~0.09 N 625~'q~.84 E 10.000 6185.17 5976747.76 N 6254&3,51 E 0.000 6244.36 5976693,25 N 625517,27 E 0.000 6344.I6 5976658,75 N 625601.03 E 0.000 6443.97 5976622:.51 N 625625.98 E 0.000 6473.7-r 597658.1 ,OB N 625682_60 E 'r0.00O 6543,48 Alaska State Plane Zone 4 PBU WOA S Pad -- Comment Conlimre Dir @ 10.000"/10Oft - 12259.67ff MD, 8745.40RT'v'D Target; S-11t~,~-30 76, Geological End Dir, Sail @ 83.357" - 12346.37ft MD, 8751.43ft TVD Slart Dir ~' lO,000°/1OOff· 12550.80i1. ,MD, 8775,08~t TVD Cor~tlnue Dir @ 10.000°7100it: 12780.1 Oft MD, 8776.40ft TVD Targel: S-11/ht-30 '['7, Geolcgical End DIr, Sail @ 93:986° ' 12800.131t MD, 8774.6b-'Tt TVO Start Dfr @ 10.000°/100fi: 13258.16ft MD, 8742.82it-I-VD ConlYrtue Dir @ 10.000°/10Oft: 13305.63ff MD, 8741.40L~ TVD Target: S-11i,M-30 TS, Geological End Dir, Sail @ 87.87l": 13340.63[t MD, 8742.221t TVD Slau'1 Dir @ lO.0O0°/1O0ft: 13629.80~t MD, 8752,97fiTVD ConEnued. . . Cc) 25 September, 1998 - 12:23 - 3 - DriliQuest Sperry-Sun Drilling Services Proposal Report for S- 1 lA WP2 Prudhoe Bay Unit Measured Su b-Sea VerEcal Local Coo rdin=tes Depth Incl. Azrm. Depth Depth Northings Eastings (ft) Ct) (fi) (f~) (ft) '[3800.00 95.443 t 39.:233 8681 .b'2: 8748.02 3434.44 S 56,B3,26 E ~3816.02 95.145 140.661 8680.O0 8746.40 3446.65 S 5693,52 E 13900.00 99.806 148.314 8668.33 8734,73 3514.27 S 5741.79 E 1391~3.12 103.2:58 156.033 8651.70 8718.10 3586;.21 S 5779.80 E 13983.16 103.260 156.036 8651.69 8718.09 3585,24 S 5779.81 E 14000.00 I03.260 I56.O36 8647.82 8714.22 3601,22: S 5786,47 E 14642.25 103.260 I56.036 8638.13 8704.53 3638.81 S 5803,18 E 14042.28 103.257 156.035 6638.'J3 8704,53 3638.83 S 5803.19 E 14100.00 97.657 154.612 8627.65 8694.05 3690.38 S 5826.88 E 14200.00 87.947 152.219 8622.77 8689.17 3779,59 S 5871.53 E 14234.36 84.610 151.396 8825.00 8691.40 3809.80 S 5887.73 E 14300.00 84.610 151.396 8631.'[7 8697.57 3867.18 S 5919.01 E 14400.00 84.610 151.396 8640.56 8706.96 3954..58 S 5966.67 E 14500.00 84.6t0 151,398 8649.95 87'[6.35 404.1.99 :S 6014-.34 ~F 14600.00 84.610 151.396 8659.35 8725.75 4129.40 S 6;062.00 I= 14700.00 84.610 151 .:396 8668.74 8735.14 4216.80 S 6109.66 E 14713.40 ~.610 151.398 8670.00 8736.40 4228.52 S 6118.05 E Global Coordinates Dogleg Vertical N orthing s Esstin gs Rate Section (fi) (it) (°/~00ft) 5976512.04 iq 625754,55 E 10.6G0 6640.40 5976;500.00 N 625765,00 E 10.(300 8655.48 5975433.16 N 625814.35 E 10.000 6731.76 5976361.8¢ N 625853.51 E 10.000 680'[.48 5976361.80 N 625853.52 E 'tO.0O0 5976346.93 N 625860,42 E 0.000 6814.95 59763{)9.62 N 625877.72 E 0.000 6848.67 5976309.60 N 625877.73 E 10.000 6848.70 5976258.43 N 625902.25 E 10.000 6895.62 5976169.95 N 625948.32 E 1 O.000 6979.95 597(~140.0D N 625965.00 E 10.1300 7009.zl,3 5976083.14 N 625997.20 E 0.0O0 7065.87 5975996,50 N 626046.26 E 0.000 7151 .~5 5975909,87 N 626095.31 E 0.000 7237.82 5975823.24 N 62614¢.37 E 0.000 7323.80 5975736.61 N 626193.43 E 0.000 7409.78 5975725.00 N 626200.00 E 0.000 7421.30 Ali data [s in feet unless otherwise stated. D[rections and coordinates are relative to True North. Vertical depths are relative to We[[. Nothings and Eastings are relative to Well The Dogleg Severity is in Degrees per 100ft. Vertical Section is from WeJl and caJcuJated along an Azimuth of 121.I20° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14713.40ft., The Bottom Hole Displacement is 7435.48ft., in the Direction of I24.659° ('l'Tue). Alaska State Plane Zone 4 PBU_WOA S Pad Cemmeflt Con[inue Dir @ 10.000°/'[00ff · 13816.02ff MD, 8746.40ff TVD Ta. rget; S-1l/M-30 Tg, Geo]ogic~l End Dir, Sat! @ '[03.258" - I3983.12ft MD, 8718.Z0[t TVD Slart Dir @ 10.000°/'[00ft- 14942,28[t MD, 870¢.53itTVD End DIr, Sail @ 84.610°: 14234.36'fi MD, 8691,40ft TVD Target: S-11/M-30 TI0, Geol~jical 4 1/2' Liner Target: S,-1 I/M-30 T11, Geological Conff~ued... ~ 25 Sop tember, 1598 - 12:23 .4 - Dr#$~uest · WELL PERMI'r CHECKI..IST FIEtl) & I~()¢)l ,...,(0 __. INIT CI. ASS -- V ADMINISTRATION I N 2 N 3 N ,1 N 5 N G N 7 N 8 N 10 N J 1~ ~ ............................ ..... · ENGINEERING '14 Conductor string provided .................. N ..................... 16 CM I' vol adequate to circtdate on conductor & suf! csg .... 17 CMI vol adequate to tie-in long string to surf csg ........ 18. CM ! wil~ cover al~ known productive horizons .......... 1 ~. Casing designs adequate for C, T, B & pem~aflost ...... 20. ^dequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... Y N -~'" 22. Adequate wellbore separation proposed ......... (:~ N ......... 23. If diveder required, does it meet regulations ...... i i 24. Drilling fluid program schematic & equip list adeq~ale .... (~) N .......................................................... 25. BOPEs, do they meet regulation ................ (~ N  DAIE 26. B(')PE press rating appropriate; test to ~~ .................. psig. (~ N ....................................................... - (¢[(~(,~ 27. Choke manifold complies w/APl RP-53 (May 84) ........ ~ N ' 28. Work will occur without operation shutdown ........... N ................................................................ 29. Is p~esence of H2S gas probable ................ (~ N ~'i l~ernfit can be issued w/o hydrogen sulfide measures ..... Y ~ 31. Dala presented on potential overpressure zones ...... Y 32 Seis~nic analysis of shallow gas zones. ' 33 Seabed condition survey (if off-shore) ............. 34. Contact name/phone for weekly pro§less ~epo~ts ..... ~ Y hi ............ l'exploratory only] ' GEOLOGY COMPANY /~-~'~.~.'_. WEll NAMF/~ ,~'~/~_~_-_~_-_! PROGRAM: exp I~_l der E] ........ ~ se,'~wellbore segll ann. disposal ................ . · ~ ~:: 2~7.:::':~ .......................................... ' ............................................ ./~~ ON/Or F SI. lORE .. AI'I'I;~ I)AII' I'u~nfit fee attacl~ed .... . · I ease ~mnrl)er appropriate ........ U~fi(lUe well name and numbe~. Well Iocaled in a defined pool ............. Well Iocaled proper dislance flora drilling unit bo~mda~y. Well located proper distance from other wells ....... S~dlicienl acreage available in drilling unit. . If devialed, is wellbore plat included ....... Operalor only affected party ................. Operator has appropriate bond in force ............. Permit can be issued wilhout conservation order ........ I'e~mil can be issued wilhoul administrative approval ...... Can permit be approved before 15-day wait ........... GEOl. O(';Y' _E_N..G !_.N_E E~R_!,..N_ _G.: UIC(~ _C._O_M_~LS._S..!Q N: ~---. _--~:~..=::: :==: ;..:.: :: :.-:-:_-*= _**~== _-.=. ~:. . M clu,ldml r,,v ,Jif (: \Jl,',f~flI~ ,,\\v(H(ll:lJl\tJliIIhl\ Ju,, Ih' I Wilh p~oper cemenling records, this plan (A) will contain waste in a suilable receivi~; .... :,. Y N (1~) will ~lot conlan~fl'esllwale~~.', (hilling wasi(~ . . Y N 1o surface; ~ / ..... (C) will rlol impair n~echami'~J~egrily of th.e wel! used for disposal; Y N (I)) will not danish ~ ilnl)air recovery from a Y N po(fi; and (E)..wil_~l ?_0_I circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N Conlmentsllnstructions' Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility 230 Tue Sep 14 14:28:16 1999 Reel Header Service name ............. LISTPE Date ..................... 99/09/14 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 99/09/14 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: MWD RUN 2 AK-MM-90019 T. MILLER R. BORDES ':~:~ 2 1 1999 AI~ O~ ~ Gas Cons. Commission ~ohora~ S-11A 500292072801 BP EXPLORATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 14-SEP-99 MWD RUN 4 AK-MM-90019 T. MILLER R. BORDES MWD RUN 6 AK-MM-90019 T. MILLER R. BORDES 35 12N 12E 1646 1855 66.90 DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: 66.90 37.90 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 20.000 137.0 9.625 8627.0 7.000 9132.0 6.000 11050.0 1. AJ~L DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED. 2. MWD RUN 1 IS DIRECTIONAL ONLY AND NOT PRESENTED. 3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER- MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) . 4. MWD RUNS 4 AND 6 ARE DIRECTIONAL WITH GAMMA RAY (NGP) UTILIZING SCINTILLATION DETECTORS. A CHANGE FROM DGR TO NGP PROBES OCCURS AT 9335'MD, 8742'TVD. MWD RUN 6 DATA IS REALTIME OWING TO TOOL LOSS DOWNHOLE. MWD RUNS 3 AND 5 MADE NO FOOTAGE AND ARE NOT PRESENTED. 5. DIGITAL DATA IS SHIFTED TO THE BHCS GR LOG OF 6/12/82 (KBE=67.S'AMSL) . THE KICKOFF POINT (WIRELINE CORRECTED) FROM WELL S-Il IS 9132'MD, 8602'TVD. 6. THIS WELL REACHED A TOTAL DEPTH (TD) OF ll050'MD, 8749'TVD, AND IS PLUGGED AND ABANDONED. SROP = SMOOTHED PJkTE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED DUAL GAMMA RAY COMBINED. SGRD = SMOOTHED GAMMA RAY. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/09/14 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR FET RPD RPM RPS RPX ROP $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH 9106.5 9113.5 9113.5 9113.5 9113.5 9113.5 9149.5 BASELINE DEPTH 9106 5 9113 5 9120 0 9125 0 9126 0 9128 5 9133 0 11038 0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REFLARKS: GR 9118.0 9125.0 9131.5 9136.5 9137.5 9140.5 9145.5 11050.5 STOP DEPTH 10977 5 9329 0 9329 0 9329 0 9329 0 9329 0 11038 0 EQUIVALENT UNSHIFTED DEPTH .... BIT RUN NO MERGE TOP MERGE BASE 2 9160.0 9377.0 4 9377.0 10098.0 6 10098.0 11050.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 RPS MWD OHMM 4 1 68 RPM MWD OHMM 4 1 68 RPD MWD OHMM 4 1 68 FET MWD HOUR 4 1 68 12 16 20 24 28 Name Min Max Mean Nsam DEPT 9106.5 11038 10072.2 3864 ROP 8.5865 485.537 118.803 3778 GR 16.0558 604.799 51.0965 3743 RPX 0.2146 2000 78.6211 432 RPS 0.2829 2000 126.622 432 RPM 0.6626 2000 186.782 432 RPD 1.4425 2000 281.448 432 FET 1.4654 38.3241 8.75647 432 First Reading 9106 5 9149 5 9106 5 9113 5 9113 5 9113 5 9113 5 9113 5 Last Reading 11038 11038 10977.5 9329 9329 9329 9329 9329 First Reading For Entire File .......... 9106.5 Last Reading For Entire File ........... 11038 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/09/14 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/09/14 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE N-UMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9118.0 9334.5 FET 9125 0 RPD 9125 0 RPM 9125 0 RPS 9125 0 RPX 9125 0 ROP 9162 0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 9341.5 9341.5 9341.5 9341.5 9341.5 9377.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEtLATURE (DEGF) MUD AT MEASURED TEMPER2kTURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: 28-NOV-98 tSC 5.08 DEPII v2.22; EWR-4 MEMORY 9377.0 9160.0 9377.0 23.3 66.7 TOOL NUMBER P1064GR4 P1064GR4 6.000 6.0 QUICKDRILN 8.70 60.0 9.0 18000 6.8 .220 .150 .200 .250 48.9 .6 Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 2 API 4 1 68 4 2 RPX MWD 2 OHMM 4 1 68 8 3 RPS MWD 2 OHMM 4 1 68 12 4 RPM MWD 2 OHMM 4 1 68 16 5 RPD MWD 2 OHMM 4 1 68 20 6 ROP MWD 2 FT/H 4 1 68 24 7 FET MWD 2 HOUR 4 1 68 28 8 Name DEPT GR RPX RPS RPM RPD ROP FET 0 1 10 1 Min 9118 31 2377 0 2035 0 2829 6626 4425 6875 4654 First Max Mean Nsam Reading 9377.5 9247.75 520 9118 604.799 114.832 434 9118 2000 78.2601 434 9125 2000 126.04 434 9125 2000 185.927 434 9125 2000 280.16 434 9125 205.113 33.267 432 9162 38.3241 8.88975 434 9125 Last Reading 9377 5 9334 5 9341 5 9341 5 9341 5 9341 5 9377 5 9341 5 First Reading For Entire File .......... 9118 Last Reading For Entire File ........... 9377.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/09/14 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF File Header Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/09/14 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.002 Comment Record FILE HEADER FILE NUJMBER: 3 R3~W MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9335.0 10040.0 ROP 9379.0 10098.0 $ LOG HEADER DATA DATE LOGGED: 01-DEC-98 SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): MEMORY TD DRILLER (FT) : 10098.0 TOP LOG INTERVAL (FT) : 9377.0 BOTTOM LOG INTERVAL (FT) : 10098.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 76.6 MAXIMUM ANGLE: 93.0 ISC 5.08 DEPII v2.22; EWR-4 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ TOOL NUMBER NGP SPC 217 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 6.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: QUICKDRILN 8.80 62.0 9.0 19000 6.1 .000 .000 .000 .000 52.8 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 4 API 4 1 68 4 2 ROP MWD 4 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 9335 10098 9716.5 1527 9335 GR 16.0558 461.821 55.5801 1411 9335 ROP 8.5865 371.25 81.9814 1439 9379 Last Reading 10098 10040 10098 First Reading For Entire File .......... 9335 Last Reading For Entire File ........... 10098 File Trailer Service name ............. STSLIB.003 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/09/14 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.004 Physical EOF File Header Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/09/14 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10040.5 ROP 10100.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: v5.16 DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10990.0 11050.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATURAL GAMMA PROBE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL 04-DEC-98 ISC 5.08 DEPII v2.22; EWR-4 MEMORY 11050.0 10098.0 11050.0 87.8 95.8 TOOL NUMBER NGP SPC 194 6.000 6.0 SEA WATER 8.50 28.0 .0 0 .0 .000 .000 .000 .000 51.7 MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STA/~DOFF (IN) : EWR FREQUENCY (HZ): REM3LRKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 .6 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 GR MWD 6 API 4 1 68 4 2 ROP MWD 6 FT/H 4 1 68 8 3 First Name Min Max Mean Nsam Reading DEPT 10040.5 11050.5 10545.5 2021 10040.5 GR 17.8278 200.69 33.2172 1900 10040.5 ROP 18.6344 485.537 166.217 1902 10100 Last Reading 11050.5 10990 11050.5 First Reading For Entire File .......... 10040.5 Last Reading For Entire File ........... 11050.5 File Trailer Service name ............. STSLIB.004 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 99/09/14 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.005 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 99/09/14 Origin ................... STS Tape Name ................ UNK~OWN Continuation Number ...... 01 Next Tape Name ........... UNKI~OWN Comments ................. STS LIS Writing Technical Services Reel Trailer Service name ............. LISTPE Date ..................... 99/09/14 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Next Reel Name ........... UNKNOWN Comments ................. STS LIS Writing Technical Services Library. Library. Scientific Scientific Physical EOF Physical EOF End Of LIS File