Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout180-134PTD: 180-1340
K~ STATE OF ALASKA '(~ Revised: 06/19/96
/~LAS OIL AND GAS CONSERVATION C ,v~MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service Squeezed While Drilling Lateral
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 80-134
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20513-01
4. Location of well at surface , 9. Unit or Lease Name
1433' SNL, 313' WEL, SEC. 33, T11N, R13E W$af~ Prudhoe Bay Unit
At top of productive interval~ 10. Well Number
N/A - Water Injector Well : Y-1 lA
At total depth 11. Field and Pool
1819' NSL, 2607' NWL, SEC. 33, T11N, R13E Prudhoe Bay Field / Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool
89.65' AMSLI ADL 028287
12. Date Spudded 113. Date T.D. Reached 114. Date Comp., Susp., or Aband.[15. Water depth, if offshore 116. No. of Completions
10/24/80 12/07/80 09/23/95 N/A MSLI Zero
"1"7. Total Depth (MD+TVD)! 18. Plug Back Depth (MD+TVD)I19. Directional Surveyl20. Depth where SSSV set~21. Thickness of Permafrosl
10495 9668 PT1 10425 9600 Fl []Yes []No I N/A MD! 1900' (Approx.)
22. Type Electric or Other Logs Run
DIL/SP/GR, DIL/SP/BHCS/GR, FDC/CNL/GR/Cal, CBLNDL/CCL/GR
!23. CASING, LINER AND CEMENTING REcoRD ..............
CASING SETTING DEPTH HOLE
SIZE VVT. PER FT. GRADE TOP Bo'FrOM SIZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulated Conductor Surface 110' 36" 8 cu yds Concrete
13-3/8" 72# L-80 Surface 2662' 17-1/2" 4301 cu ft Permafrost II
..... 9.5/8,, 47# L-80 '"surf'ace 9530, 12-1/4" 13'20 cu ft 'G', 130 cu ft Pi: ......
7" 29# L-80 9033' 10472' 8-1/2" 462 cu ft Class'G'
i
24. Perforations open to P'md'~'ction (MD+TVD of ToP and Bottom 12'51 TUBING RECORD'
and interval, size and number) .......
,
SIZE DEPTH SET (MD) PACKER SET (MD)
N/A N/A 8953'
MD TVD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
..................... 9606' "~'queeze Plugl 400 sx class 'G' ' ........
9236' & 8830' Plugs; 370 sx 'G', 600 sx 'G', Sqzd 2000 psi
8783' Cement Plug, 260 sx Class 'G', Sqzd 2000 psi
8609' Kick Off Plug, 240 sx Class 'G', Sqzd 2000 ps~
27, PRODUCTION TEST
Date First Production .......... iMetho'(J'of Operation (Flowing, gas i'i~'i' et'~i'i ........
Not On Production I N/A
Date of Test Hours Tested PRODUCTION FOR oI'L-'BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-O'i~ ....RATIO
TEST PERIOD ~
I
Flow Tubing Casing Pressure 0ALCULATED I~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
ORIGINALRECEIVED
JUN 2 1
Alaska Oil & Gas Cons
Anch0mge
............. , ....................
Form 10-407 Rev. 07-01-80 ~ Submit In Duplicate
29. Geologic Marke(~. 30. (' Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name Depth Depth and gravity, GOR, and time of each phase.
BKB S S
9668' 8776'
Sag River
9684' 8792'
Shublik
9757' 8862'
Ivishak
31. List of Attachments ...................
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~f'~/~ ~~,~, ~.//~.~.o~
Terr~Jordan Title Senior Drilling Engineer Date ~ (,
Prepared By Name/Number Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL.' This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1-' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5; Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27.' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
RECEIVFD
7
Anct~or~g~
PLUGGINg'
& LOCATION
CLEAR(~4CE
REPORT
State of Alaska
.ALASKA 0iL & GAS CONSERVATION COMI~iSSiON
Norm casing
Sfc C~g: I ~3
Long Csg: ~q~
Liner: ' 7
Perf i~tez~zals- tops:
e 7,'0 'f 77/,, ~797 73:'/]
Review the well file, and' Comment on plugging, well head
status, and !o~at~on~!earance - urovid_e %oc. clear, code.
Marker ~ost o=. plate
Location Clear~.nce: _
Code
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: Y-11L1
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 08/30/95 02:00
SPUD:
RELEASE: 10/16/95 08:00
OPERATION:
DRLG RIG: DOYON 14
WO/C RIG: DOYON 14
08/30/95 (1)
TD:10472' ( 0)
08/31/95 (2)
TD:10472' ( 0)
09/01/95 (3)
TD:10472' ( 0)
09/02/95 (4)
TD:10472
PB: 8781
CIRC AND KILL WELL MW: 0.0 VIS: 0
ACCEPT RIG FOR OPERATIONS AT 0200 HRS, 08/30/95. TURN KEY
RIG MOVE F/Y-05IA TO YllL1. TAKE ON SEA WATER, R/U AND PULL
BPV W/FIELD SERVICE LUBRICATOR. ANNULUS HAS 400 PSI, TBG<50
PSI (TRAP PRESSURE). PRESPUD MEETING. BLEED OFF ANNULUS,
PUMP DOWN TUBING TAKING RETURNS F/ANNULUS.
PULL & L/D 7" TUBING MW: 0.0 VIS: 0
CONTINUE CIRCULATING AND KILL WELL W/SEAWATER. FIELD
SERVICE INSTALLED 2 WAY CHECK. ND TREE AND ADAPTER FLANGE
(CHECK HANGER THREADS, 7" IJ4S OK). NU DOWN BOP'S AND
CHANGE TOP RAMS TO 7" X 4-1/2" VERIABLE. TEST TO 3500 PSI
DUE TO 7" TEST CSO RAMS TO 5000 PSI. FIELD SERVICE PULLED 2
WAY CHECK, 200 PSI ON TUBING BLEED THROUGH CHOKE, NO
VOLUME. L/D LUBRICATOR. M/U 7" LANDING JOINT AND
CIRCULATING HOSE, BACK OUT LOCK DOWN SCREWS, PULL HANGER TO
FLOOR 270 K TO BREAK LOOSE HANGER, 225K TO PULL. CIRCULATE
AND R/U HES TO PULL CONTROL LINE. PULL 7" 26# HT80S NSCC
TUBING. HAVE 175 JOINTS L/D AT 0600 OF 216+ JTS RECOVERED
30 STAINLESS BANDS.
M/U WHIPSTOCK ASSY MW: 0.0 VIS: 0
CONTINUE PULL AND L/D. R/U AND TEST BOPE, STATE WITNESS NOT
AVAILABLE. BHA #1. TAG 7" TBG STUB AT 8905' POLISH STUB.
CIRC HIGH VIS PILL AROUND. CHECK FOR FLOW, POOH L/D MILL,
STABS AND LDC. P/U AND M/U HALLIBURTON WHIPSTOCK ASSY, AS
PER PROGRAM.
CBU W/STARTER MILL WINDOW CUT MW: 0.0
CONTINUE M/U HOWCO WHIPSTOCK ASSY W/STARTER MILL, RIH FILL
PIPE EVERY 5 STANDS W/SEAWATER T/8948'. 4-1/2" WLEG, TOP OF
WHIPSTOCK AT 8781'. R/U ATLAS AND RUN 2-1/4" GYRO/GR COMBO.
CHECK DEPTH CONTROL, ON. DEPTH AND ORIENTATION 15 DEG R OF
HI-SIDE OF HOLE. PULL GYRO OUT, CHECK TATTLETAIL, OK. SET
HOWCO WHIPSTOCK PKR W/2500 PSI, PUT 35K DOWN ON PKR AND
HOLD PRESSURE 10 MIN., OK. BLEED OFF PRESSURE TO 0,
PRESSURE UP DP AND CSG ANNULUS AT SAME TIME TO 3500 PSI,
HOLD 10 MIN, OK. RIH W/ATLAS GYRO FOR CHECK SHOT,
EVERYTHING IN SAME PLACE. P/U KELLY OPEN PORTS W/3300 PSI
IN STARTER MILL, DISPLACE SEAWATER W/10 PPG FLO-PRO MUD.
SHEAR PIN ON WHIPSTOCK W/12-14K OVER PULL. STARTER MILL CUT
OUT OF 9-5/8" PIPE AT 8783' TO 8785'. CBU.
FEB 2 6 199G
A~ask~. Oit & Gas Cons~ Commission
Ancho~e~
WELL : Y-11L1
OPERATION:
RIG : DOYON 14
PAGE: 2
09/03/95 (5)
TD: 8813
PB: 8783
09/04/95 (6)
TD: 8813
PB: 8783
09/05/95 (7)
TD: 8813'(
09/06/95 (8)
TD: 8837'(
o)
24)
RIH W/WHIPSTOCK RECOVERY TOOL MW: 0.0
FLOW CHECK 10 MIN. PUMP PILL, POOH W/STARTER MILL, L/D
ATLAS RA SUB, AND STARTER MILL. M/U WINDOW MILL AND
WATERMELON MILL BHA %3. RIH T/8787'. MILL WINDOW OFF
WHIPSTOCK F/8787' TO 8813'. CBU, CIRC 2 LOW VIS SWEEPS AND
SPOT HI-VIS PILL ON BOTTOM. 10 MIN. FLOW CHECK, POOH, L/D
WINDOW MILL AND 5" HWDP. M/U BHA %4 MWD W/WP RETRIEVAL TOOL,
BENT RETRIEVAL TOOL IN STACK WHILE ORIENTING MWD, CHANGE
OUT TOOL. RIH FILL PIPE AT 3097' AND TEST MWD.
SET HOLLOW WHIPSTOCK MW: 0.0
CONT'D RIH TO 8787', TOP OF WHIPSTOCK. P/U KELLY, ORIENT
RET. TOOL TO LOW SIDE OF HOLE. NEEDED NO CORR. SLID DOWN WS
FACE 5'. P/U AND LATCHED INTO WS. P/U 80K TO RELEASE WS.
POOH. NO WS. RETRIEVING TOOL BENT. L/D RET TOOL AND MWD.
P/U BOX TAP, BIT SUB, 1 6-3/4" DC, B S, JARS, 9 6-3/4" DC.
TIH. P/U KELLY. TAGGED WS AT 8790'. P/U 5'. ROTATED DOWN
OVER WS TO 8792'. 20K DOWN AND 300 AMPS MAX. P/U 100K AND
SHEARED WS. TOH WITH BOX TAP. RECOVERED SOLID WHIPSTOCK.
P/U HOLLOW WHIPSTOCK AND TIH. P/U KELLY, ORIENT MULE SHOE.
SET INTO PKR W/20K. NOT LATCHED. S/O TO 125K AND SHEARED
STUD. INDICATED WHIPSTOCK IN POSITION AND NOT CONNECTED TO
RUNNING TOOL. WS AT 8792'.
WORKING WATERMELON MILL MW: 0.0 VIS: 0
TOH W/COMPLETE WHIPSTOCK RUNNING TOOL. L/D BHA #6. BENT
BLOCK RAIL CARRIAGE, L/D DAMAGED CARRIAGE. BHA #7. STAGED
IN HOLE, BREAKING CIRC EACH 10 STDS. TESTED MWD AT 4155'.
TRIP SPEED CONTROLLED TO PREVENT BLOCK SWING. ORIENTED 0
DEG, SLID THROUGH WINDOW TO 8808'. STARTED PUMPS AND SLID
TO 8811'. PACKED OFF. P/U T/8808'. STUCK, WORKED MTR STAB
BACK THROUGH WINDOW. CIRC HOLE CLEAN. TOH W/BHA #7. BHA #8.
TIH T/8780', TOP OF WINDOW. CIRC AND PREP TO REAM WINDOW
AREA WITH TANDEM WATERMELON MILLS.
TIH WITH BHA #10 MW: 0.0 VIS: 0
REAMED T/8813' WITH BHA #8. DRILLED F/8813' T/8837' WITH
BHA #8. WORKED & REAMED WITH TANDEM WATERMELON MILLS
8787-8803 THRU WINDOW & TOP OF WHIPSTOCK. SMOOTH-NO DRAG.
POOH WITH BHA #8. LD BHA #8. PU BHA #9. CHANGED PULSER &
ORIENT. TIH. CUT & SLIPPED 59.5' DRILL LINE. TIH & PU KELLY
ON'TOP OF WINDOW. ORIENT TO HIGH SIDE. ATTEMPT TO SLIDE
-THRU WINDOW. ORIENT TO 30 DEGREE INTERVALS. NO PROGRESS.
ATTEMPT TO ROTATE WITH SLIGHT WT DOWN ON SLIPS. NO
PROGRESS. DEPT=8794'. TOP OF WHIPSTOCK. CIRC & COND MUD.
TOH. LD BHA. HAD 5 BROKEN TEETH ON OUTER ROW ON 1 CONE. PU
BHA #10. TIH WITH BOX TAP TO RETREIVE WHIPSTOCK.
WELL : Y-11L1
OPERATION:
RIG : DOYON 14
PAGE: 3
09/07/95 (-9)
TD: 8837'( 0)
09/08/95 (10)
TD: 8837' ( 0)
09/09/95 (11)
TD: 8837' ( 0)
09/10/95 (12)
TD: 8882' ( 45)
WAITING ON BOX TAP MW: 0.0 VIS: 0
CONT. TIH T/8760'. P/U KELLY. TAGGED WHIPSTOCK AT 8792'.
WORKED OVER TOP, FISH APPEARED TO RELEASE SUDDENLY. TOH TO
BHA AND STOOD BACK. NO FISH. VISIBLE DAMAGE TO BOX TAP.
PAINTED SAME FOR NEXT TRIP. BHA #11, TIH. ROTATE OVER
WHIPSTOCK. ALLOWED TORQUE TO WORK SLOWLY AT END IN AN
EFFORT TO MAXIMIZE BITE. P/U, OVERPULL, BOX TAP RELEASED.
POH, NO FISH. BOTTOMED OUT IN TAP, WICKERS SMOOTH. TESTED
BOPE, WITNESS WAIVED BY JOHN SPAULDING. BAKER MACHINE SHOP
IS BUILDING A BOX TAP WITH 7-3/4X6-7/8" CATCH.
TOH W/ BOX TAP MW: 0.0 VIS: 0
WAITED FOR HES W/L TO RUN IMPRESSION BLOCK. RU HES 3/16"
BRAIDED LINE & 8.5" LIB. ATTEMPED TO RIH. WOULD NOT ALLOW
ENOUGH FLUID TO BYPASS. POOH. PU 8-1/4" LIB. RIH & TAGGED
WHIPSTOCK @ 8792 W/6000# @ 75 FPH. POOH. LIB HAD 1.5"
CRESCENT MARK @ 3" FROM NEAREST SIDE. TOP OF WHIPSTOCK BENT
& PROBABLY CURLED TO CENTER OF HOLE. RD W/L. PREP TO RUN
BHA #12. RIH W/ BHA #12. PU KELLY. ESTABLISHED PU, SO, ROT.
SET 10K ON WHIPSTOCK. WORKED 8 RDS RH TORQUE OUT. TRAPPED 3
RDS. CONT UNTIL 17 RD TRAPPED & 310 AMPS STALLED. PU TO
250K, 260K, 315K, 335K (100K OVER) @ 100K OVER PU, SAW
WHIPSTOCK SHEAR. VERIFIED W/ PU DRAG. POOH 1 STD. RU ATLAS.
RIH W/ CCL & GR. TAGGED @ 8653'. TOP OF BOX TAP. RD ATLAS.
10 MIN FLOWCHECK & TOH.
POH W/WHIPSTOCK RUN TOOL MW: 0.0 VIS: 0
CON'T TOH TO BHA. STOOD BACK BHA TO BUMPER SUB. L/D BOX TAP
AND WHIPSTOCK. TOP WAS BENT OVER INTO THE CENTER AND'WAS
MISSING PIECE. LATCH WAS IN GOOD ORDER. BHA #13. TIH
T/8695'. CIRC MUD PRIOR.TO DROPPING BALL. DROPPED BALL.
PRESSURE CHANGE. VAC'D LATCH AREA TO 8812'. TOH W/JET
BASKET. RECOVERED SEVERAL SMALL THIN PIECES OF CASING. M/U
AND ORIENTED BHA #14. TIH FILLING PIPE EACH 10 STANDS.
ORIENTED WHIPSTOCK, DID NOT LATCH. REPEATED. SAW SHEAR, P/U
AND OBSERVED POSITIVE PULL. SHEARED PIN. STOOD BACK KELLY
AND L/D DP. TOH WITH WHIPSTOCK RUNNING TOOL.
WORKING REV JUNK BASKET' MW: 0.0 VIS: 0
POOH AND L/D BHA #14. BHA #15. RAN CHIPBOARD BIT GUIDE ON
BIT. TIH. ATTEMPTED TO WORK THROUGH WINDOW WITHOUT ROTATING,
NO GO. P/U KELLY AND ORIENT, WORKED THROUGH 8803'. WASHED
AND WORKED 8803' TO 8837'. HOLE IN GOOD SHAPE. DRILLED 803'
TO 8882'. BIT APPEARED TO BE FOULED. PUMPED BACK TO WINDOW.
WORKED THROUGH WINDOW, NO PROBLEMS. POOH, L/D BHA, BIT
SHOWED SCARS ON LUGS AND 2 BROKEN OUTER TEETH. P/U REV JUNK
BASKET. RIH TO TOP OF WINDOW. WORK JUNK BASKET AT TOP OF
WHIPSTOCK.
FE8 2 6 1996
A~ask~ Oil & G~$ CoDs. Commission
Anchorage
WELL : Y-11L1
OPERATION:
RIG : DOYON 14
PAGE: 4
09/11/95 (13)
TD: 8910'( 28)
09/12/95 (14)
TD: 9330'( 420)
09/13/95 (15)
TD: 9724' ( 394)
09/14/95 (16)
TD: 10010' ( 286)
09/15/95 (17)
TD:10010' ( 0)
09/16/95 (18)
TD:10410' ( 400)
09/17/95 (19)
TD:10770' ( 360)
ATTEMPT TO DRILL MW: 0.0 VIS: 0
WORKED JET BASKET BY WHIPSTOCK. DROPPED BALL AND USED HYD.
FORCE. WASHED AND REAMED 8852' TO 8882'. CUT 6" CORE ON
BOTTOM. TOH, L/D BHA #16. BHA 317. TIH W/TAPERED MILL.
MILLED 5' AREA ABOVE AND BELOW TOP OF WHIPSTOCK. MILLED
BOTTOM OF WINDOW AND ROTATED IN HOLE. MILLED 2' TO TRY TO
JAM METAL INTO THE WALL. TOH WITH BHA #17. BHA #18. TIH
FILLING PIPE EACH 10 STANDS. TIH TO TOP OF WINDOW. ORIENTED
TO 50 DEG RIGHT AND WORKED OVER WHIPSTOCK. DRILLED 8884' TO
8910'. THE SAME PIECE OF JUNK IS STILL IN THE HOLE AND IS
STILL CAUSING THE BIT TO STALL. HOPEFULLY WE WILL WORK PAST
AND JAM IT INTO THE WALL. THE ONLY DANGER IS THAT THE BENT
HOUSING ON THE MOTOR MAY STRIP IT OUT OF THE WALL 9ON EACH
TRIP.
CHANGING BHA MW: 0.0 VIS: 0
DIRECTIONALLY DRILLED 8910' TO 9330'. CBU. RAN GYRO DATA TO
CONFIRM MWD. NO APPARENT PROBLEM. CIRC AND R/D ATLAS GYRO
DATA. TOH WITH BHA #18.
DRILLING MW: 0.0 VIS: 0
POOH TO BHA. BHA #19. TIH, ORIENT AND GO THROUGH WINDOW W/O
TROUBLE. DIRECTIONALLY DRILL FROM 9330' TO 9724'.
CIRC TO TOH MW: 0.0 VIS: 0
DRILLED 9724' TO 9750' SAW REDUCED RETURNS. STOPPED
PUMPING, MONITORED WELL (STATIC). SHORT TRIPPED TO WINDOW.
DIRECTIONALLY DRILLED 9750' TO 10010'. MUD LOSS CONTROLLED
BY REDUCING PUMP RATE. HOLE APPEARS TO BE STABLE, BUT MAX'D
ECD.
DISPLACING TO FLO PRO MUD SYS MW: 0.0 VIS: 0
CBU, POH. TIGHT, TOTAL FILL OK. TESTED BOPE. WITNESSED BY
AOGCC REP. SET WEAR RING. BHA #20, TIH T/8750'. TESTED
UPPER AND LOWER KELLY VALVES. TIH T/9590', HOLE TIGHT.
REAMED 9560' TO 9663'. AFTER REAMING, HOLE SMOOTH.
ATTEMPTED TO TIH, NO GO, BUILD SECTION NEEDED REAMING.
REAMED 9663' TO 10010'. LAST JT SLID WITH NO PROBLEM.
DISPLACE TO FLO PRO MUD SYSTEM.
DRILLING MW: 0.0 VIS: 0
FINISHED DISPLACING WITH FLO PRO MUD. DIRECTIONALLY DRILLED
T/10410' SEVERAL AREAS REQUIRED WORKING AND REAMING TO
SMOOTH LEDGES.
POH FOR HOLE OPENER MW: 0.0 VIS: 0
DIRECTIONALLY DRILLED T/10770'. CIRC HOLE CLEAN. CBU, MUD
STABLE. PUMPED OUT OF HIGH BUILD AREA AND NEW HOLE TO AVOID
SWABBING. HOLE TAKING PROPER FILL.
FEB 2 6 ]996
~aska Oil & Gas Cons. C~mmissio~
Anchorage
WELL : Y-11L1
OPERATION:
RIG : DOYON 14
PAGE: 5
09/18/95 (20)
TD:10770' ( 0)
09/19/95 (21)
TD:10770' ( 0)
09/20/95 (22)
TD:10770' ( 0)
09/21/95 (23)
TD:10770' ( 0)
09/22/95 (24)
TD:10770' ( 0)
HOLE OPENER RUN MW: 0.0 VIS: 0
CONT'D PUMPING OUT OF HOLE T/9342'. L/D SGLS T/8802'.
ORIENTED AND PULLED THROUGH WINDOW. POOH T/7538'. MUD NOT
BALANCED. CIRC AND BALANCED MUD. POOH TO BHA, L/D BHA #20.
BHA #21 - TIH T/8762', JUST ABOVE WINDOW. PU KELLY AND
WORKED HOLE OPENER THROUGH WINDOW. REAMED AND CIRC HOLE
CLEAN T/9500'.
P/U FISHING BHA MW: 0.0 VIS: 0
CONT'D REAMING 9500' TO 9749'. KINGAK SLOUGHING 9612' TO
9719'. WORKED TO 9749'. ATTEMPTED CONN., COULD NOT RETURN
BEYOND 9725'. HOLE NOT TAKING ANY MUD. CIRC AND FINISHED
LUBETEX TREATMENT. POOH, LEFT FISH IN HOLE.
P/U HOLE OPENER BHA #24 MW: 0.0 VIS: 0
TIH WITH BHA #22 T/8792'. ATTEMPTED TO ORIENT OVER
WHIPSTOCK, UNSUCCESSFUL. POOH AND LAY DOWN BHA #22. BHA #23,
TIH T/8792'. ORIENTED PAST WHIPSTOCK. TIH T/9060, TAGGED.
WASHED 9033' TO 9070'. TIH T/9527', WASHED T/9650'. ENGAGED
FISH AT 9650' BY WORKING OVER AND MONITORING PUMP PRESSURE.
WORKED FISH FREE. TOH W/FISH. L/D FISH AND BHA #23. BHA #24.
TIH, FILL PIPE EVERY 3000' MW: 0.0 VIS: 0
LAY DOWN 6-3/4" DRILL COLLAR. BHA #24, TIH WITH 8-1/2" HOLE
OPENER T/8732'. REAM 9640' TO 9715', HOLE PROBLEMS FROM
SLOUGHING SHALE. REAM EACH JOINT UNTIL CLEAN. WHILE REAMING
AT 9715' DRILL STRING TORQUED UP AND HOLE PACKED OFF.
ATTEMPT TO WORK FREE, PIPE STUCK, CANNOT ROTATE, CIRCULATE,
PICK UP OR SLACK OFF. WORKED STUCK PIPE FREE. CIRC AND
RECIPROCATE PIPE, INCREASE MUD WEIGHT. PUMP SLUG, POOH,
PIPE TIGHT. LAY DOWN STABILIZERS AND ROLLER REAMER. BHA #25,
TIH, FILL PIPE EVERY 3000'
TIH WITH 8-1/2" MILL MW: 0.0 VIS: 0
FINISH TIH T/9628', FILL PIPE EVERY 3000'. PU KELLY, REAM
F/9628' T/9739'. TAG FILL @ 9650', REAM T/9718' SLOWLY. OK.
SLOUGH SHALE OVER SHAKERS @ 9718'. DRILL STRING TORQUED UP
& PACKED OFF, WORK FREE, CONT REAMING F/9718' T/9739'.
COULD NOT WORK CLEAN. SHALE OVER SHAKER DECREASED TO SMALL
AMOUNT. MONITOR WELL, PUMP SLUG, POOH FOR BHA CHANGE. FOUND
HOLE OPENER HAD BROKEN OFF BULL NOSE @ BODY OF HOLE OPENER.
LEFT 6' BULL NOSE, THREE CUTTER ASSY IN HOLE, OD OF TOP OF
FISH=7-3/4". LENGTH OF FISH=5.93'. SERVICE WB. MU BHA #26,
8-1.2" MILL ON 1.25 DEC BENT SUB TO GET PAST WHIPSTOCK. TIH
WITH MILL. BOP TEST EXTENSION FROM BOBBY FOSTER OF AOGCC
FOR 24 HRS.
WELL : Y-11L1
OPERATION:
RIG : DOYON 14
PAGE: 6
09/23/95 (25)
TD:10770' ( 0)
09/24/95 (26)
TD: 9100' ( 0)
09/25/95 (27)
TD: 9100' ( 0)
REAMING AT 9740' MW: 0.0 VIS: 0
FINISH TIH WITH 8-1/2" MILL TO TOP OF WHIPSTOCK AT 8792'.
ATTEMPT TO ENTER WHIPSTOCK, WORK DP AROUND TO ATTEMPT TO
ORIENT BENT SUB TO HIGH SIDE. COULD NOT ENTER WHIPSTOCK.
ROTATE ON TOP OF WHIPSTOCK AND ATTEMPT TO ROLL MILL OFF
INTO WHIPSTOCK, COULD NOT ENTER WHIPSTOCK. PUMP SLUG, POOH,
LD MILL. MARKS ON MILL 2" FROM OUTSIDE EDGE. BHA #27, TIH,
WORK BIT THROUGH WINDOW AT 8792'. CONTINUE TIH T/9659', NO
PROBLEMS. PU KELLY AT 9659', REAM 9659' TO 9703'. TAG FILL
AT 9690'. PROBLEMS WITH SLOUGHING SHALE, REAM DOWN TO
9703'. MAKE CONNECTION, CANNOT GET KELLY BUSHINGS IN. L/D
SINGLE, RE-REAM, INCREASE MUD, CONTINUE REAMING. CANNOT GET
BUSHINGS IN AFTER CONNECTIONS DUE TO FILL. L/D SINGLES AND
RE-REAM. SHALE STILL SLOUGHING IN HOLE. MADE CONNECTION
WITH PUP JT. CANNOT GET KELLY BUSHING BACK IN ROTARY TABLE
WITH FULL JT OF DP DUE TO FILL. REAMING 10-12 FT/HR. WELL
COULD HAVE SIDETRACKED AT APPROX 9720'. WEIGHT REQUIRED TO
REAM INCREASED, NO SIGN OF DRILLING ON JUNK.
TEST BOPE MW: 0.0 VIS: 0
CONTINUE TO REAM OR DRILL NEW HOLE T/9749'. SHALE CONTINUED
TO SLOUGH INTO HOLE. CANNOT KEEP HOLE OPEN LONG ENOUGH TO
MAKE CONNECTION AND GET KELLY BUSHINGS BACK IN ROTARY
TABLE. INCREASE MUD WEIGHT. PLUG BIT WITH SHALE WHILE
GETTING BUSHINGS INTO TABLE AFTER A CONNECTION. COULD NOT
UNPLUG BIT. POOH, WET TRIP, L/D BHA. M/U ROUNED NOSE CEMENT
NOZZLE ON 5" DP, TIH F/CEMENT PLUG. CONTINUE TIH TAG FILL
AT 9702'. CIRC WHILE BATCH MIXING CEMENT. PUMP CEMENT
SLURRY. DISPLACED TO BALANCE PLUG. CEMENT CALCULATED ON
600' PLUG OF GAUGE HOLE + 50% EXCESS. CIP AT 2225 HRS
09/23/95. POOH SLOW T/8865', DP DRY. CIRC AT 8865', 63'
BELOW WINDOW, NO CEMENT BACK. POOH, L/D DP. PULL WEAR
BUSHING, INSTALL TEST PLUG, TEST BOPE.
TROUBLE SHOOT MWD MW: 0.0 VIS: 0
FINISH TESTING BOPE. WITNESS OF TEST WAIVED BY AOGCC. M/U
CEMENT NOZZLE. NO PROBLEM ENTERING WHIPSTOCK. FIND TOP OF
CEMENT AT 9558', TOO LOW FOR SIDETRACK. CIRC AND CONDITION
MUD, DUMP CEMENT CONTAMINATED MUD. WASH DOWN TO 9606' DPM
TAG FIRM CEMENT. PUMP BALANCE CEMENT PLUG. CEMENT IN PLACE
AT 1825 HRS 09/24/95. POOH T/8860'. PIPE CAME WET ON STAND
#7. EST TOP OF CEMENT AT 9100'. CIRC AT 8860', 58' BELOW
WINDOW. NO CEMENT BACK. POOH. BHA ~28, RIH T/2658'. SHALLOW
TEST MTR AND MWD. MWD WILL NOT FUNCTION. TROUBLESHOOT
SURFACE EQUIPMENT, NO PULSE. POOH TO CHECK MWD. CHANGE OUT
MWD PROBLE.
FEB 26 1996
Alaska Oil & Gas Cons. Commissio~
Anchorage
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 13 September 1995
RE: Transmittal of Data
Sent by: HAND CARRY
Dear Sir/Madam,
Enclosed, please find the data as described below:
/~ DESCRIPTION
WELLy_11 ~ '~ '~' ~)'~~'
F-42 (22-35-12-13) 1 CN/GR FINAL BL+RF
I GR/CCL FINAL BL+RF
1 CN/GR FINAL BL+RF
1 CN/GR FINAL BL+RF
ECC No.
Run # i 5157.09
Run # 1 5607.11
Run # 1 5661.10
Run # 1 5953.09
Run # 1 5967.03
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services '~C(~/
5600 B Street
Anchorage, AK 99518
Or/~AX to ( 907 ) 563-7803 0//
Received by: ~~-9 Date: 40¢~o~"?,?. {~.~,~.
.~iease sign and return
~etrotecPm. ical Data Center
8P Exploration (Alaska) Ins
900 East Benson Boulevard
Anchorage, Alaska 99508
~ STATE OF ALASKA
Al& J~ OIL AND GAS CONSERVATION COMMIS[~.
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate Plugging Perforate X
Pull tubing Alter casing Repair well Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development X
Exploratory
Stmtigraphic
Sewice
4. Location of well at surface
1433'SNL, 313' WEL, SEC. 33, T11N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1817'NSL, 2637' WEL, SEC. 33, T11N, R13E, UPM
At total depth
1819' NSL, 2673' WEL, SEC. 33, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
ORIGINAL
10495 feet Plugs (measured)
BKB 9668 feet
10347 feet Junk (measured)
BKB 9523 feet
6. Datum elevation (DF or KB)
KBE = 86.95 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-1 li (33-33-11-13) PBU
9. Permit number/approval number
80-134 / 9-191
10. APl number
50- 029-20513-01
11. Field/Pool
Prudhoe Oil Pool
fill at 10347' MD (10/4/91)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Length Size Cemented Measured depth
..
110 20 x 30 8 c.y. 146
2626 13 3/8 4301 c.f. 2662
9494 9 5/8 1450 c.f. 9530
..
measured
true vertical
Tubing (size, grade, and measured depth)
1439 7 462 c.f. 9033-104 72
9662'-9685' (Sag R)
9760'-9768', 9776'-9790', 9797'-9806', 9814'-9875' (Ivishak)
subsea 8771'-8793' (Sag R)
8865'-8977' (four Ivishak intervals)
7"26#,NT80S, NSCC tubing to 9030'MD
Packers and SSSV (type and measured depth)
True vertical depth
BKB
146
2662
8730
8250-9646
AUG 30 1995
N.~$]~ J~JJ & Gas CoDg, Commissior
--,, ~cllOl'age '
9 5/~" ~ak~r SA~L' Packer at ~94~'MD, 7" Otis'HR: ~VN~2095'MD
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Reoresentative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
Subsequent to operation
200
2156
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations
16. Status of well classification as:
Oil Gas Suspended
Service water injection well ,
SignedL/~/iz3~ ~ ~,,,'C / /~/' ~2'(V'HF_.. Title Senior Technical Assistant II
Form 10-4(J4 Rev 0~15/88
Date
SUBMIT IN DLd'PLIC'AT,~
10/19/94
11/05/94
WELL Y-Iii (33-33-11-13)
Addperf/Stimulation Operation
The following interval were reperforated using 3 3/8" guns, 6 SPF, random
orientation and 60" phasing.
9760' - 9770' MD
A HCL Perf Wash Treatment was performed using the following fluids:
OPERATIONS SUMMARY
Reverse in hole with 3.4 .... nozzle down to 8200 ft. Saw no "bridge" and
continue reversing in hole down to a solid bottom at 9760 ft CTD. (last E-
line TI) 9774 ft on10/10/94). Pull above perforations and park nozzle.
Attempt injection test. Walk pump up to 3500 psi. ("It's a flat liner").
Discuss the acid treatment with Rarm'od, and decided to "go for it". Rig up
BJ. Pump 1000 gal 15% HCL/10%XYL and displace with seawater. Lay acid
across perforations and let soak. Pumped acid away with a final rate of 1.3
bpm/3500 psi. Rig down BJ. TII-I and Tagged bridge at 9760' and jetted with
SW and unable to jet fill. POOH and FP CT. Confirmed with FOC to PU
motor and mill to Clean out fill prior to adding perfs. Conduct BOP test
while wating on tools and fluid. SV leaked, Grease crew serviced SV.
Aborted BOP' test because of leaking SV. Install CTC and tools and install
2'*6" ID spacer spool below BOP's
Picked up 5.75" mill and 3.5" mtr. Cleaned out tbg down to SSSV nipple
insert. Heavy buildup in first couple of joints of tbg below the hanger.
Picked up 3.6" mill and tagged bridge @ 9760 ctd. Washed w/mill dwn to
1990 ctd easily. Did not see any drlg resistance at the bridge, orked mill
from 9740 to 9790. Pulled out and picked up 3.41" reversing nzl. TIH and
started to Rev Cir from 9680' to 9806'. Worked from 9700 to 9806 (PU)
several time while Rev, cir hole. Shut down pump for 30 minutes and check
fill. Tagged at 9806' and POOH. FP CT with MEOH and strung MEOH from
2000' to surface. OOH and RD CTU
25
FLUIDS PUMPED
BBLS. DESCRIPTION
SEAWATER, FILTERED TO 3 MICRONS
15% HCL/10% Xylene with standard additives.
The following interval were reperforated using 3 3/8" guns, 4 SPF, random
orientation and 90° phasing.
9770' - 9790' MD
,.
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 17 August 1995
RE: Transmittal of Data
Sent by: ANCH.EXPRESS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
I PLS FINAL BL+RF
1 CCL FINAL BL+RF
1 PLS FINAL BL+RF
1 PL'S/'STP'FINAL BL+RF
ECC No.
Run # 1 3867.02 ·
Run ~ i 5157.08
Run ~ 1 6014.03
Run ~ 1 6156.01
Please sign and return to: Attn. Rodney D. Paulson
~ Or FAX to (907) 563-7803
.
Received ByX~'~.~"~ ~_/~..._~~'~' Date:
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 10 November 1994
Transmittal of Data
Sent by: COURIER
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
1 PFC/GR FINAL BL
1 PFC/GR RF SEPIA
1 PFC/GR FINAL BL
1 PFC/GR RF SEPIA
1 PFC/GR 'FINAL BL
1 PFC/GR RF SEPIA
1 PFC/GR FINAL BL
1 PFC/GR RF SEPIA
1 PFC/GR/CCL FINAL BL
1 PFC/GR/CCL RF SEPIA
1 CCL/PFC FINAL BL
1 CCL/PFC RF SEPIA
1 CN/GR CH FINAL BL
1 CN/GR CH RF SEPIA
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
ECC No.
2577.04
4544.O1
4547.O1
5157.O7
5659.03
5798.10
5850.03
· P'~ ~ign and reL-~z-~-~ b~. ALi=~ ~=ti~= oervl~
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Or F~to (907) 563-7803
Received by: ~ ~ Date:
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 13 October 1994
Transmittal of Data
Sent by: U.S. MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
DESCRIPTION
1 PL/STP FINAL BL
1 PL/STP FINL.RF SEPIA
' 1 PLS FINAL BL
1 PLS FINAL RF SEPIA
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
1 PL/STATIC FINAL BL
1 PL/STATIC RF SEPIA
1 PLS/STP FINAL BL
1 PLS/STP RF SEPIA
1 PLS FINAL BL
1 PLS FINAL RF SEPIA
Run # 1
Run ~ 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
Run # 1
ECC No.
4529.03
4911.04
5157.06
5761.05
6022.03
6075.06
ea ' ~ a re · as' ' services
5600 B Street
Suite 201
Anchorage, AK 99518
~ Attn. Rodney D. Pauls°n
Received byf /~44~/~/)(~.~ Date:
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 26 September 1994
RE: , Transmittal of Data
Sent by: U.S. MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
1 PFC/PERF FINAL BL
i PFC/PERF RF SEPIA
1 CCL/TUB FINAL BL
i CCL/TUBPAT. RF SEPIA
1 GR/CCL FINAL BL
I GR/CCL FINL.RF SEPIA
i PLS/INJPROF.FINAL BL
1 PLS/INJPROF.RF SEPIA
ECC No.
Run # 1 1991.05
Run # 1
Run # 1 5025.03
Run # 1
Run # 1 5157.05
Run # 1
Run # 1 5716.03
Run # 1
Please sign and return to: Atlas Wireline Services
5600 B.Street
Suite 201
/ ~ Anci~orage, AK 99518
At
Received
~/~_~~ney D. Paulson
Date:
RECEIVED
OCr 0 6 1994
Alaska Oil & Gas Cons, Commission,
Anchorage
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 9 September 1994
RE: , Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
. .l' WELL
(23-04-10-13)
5~'~~ H- (41-28-11-13 }
DESCRIPTION
1 CCL/PATCH FINAL BL
i CCL/PATCH RF SEPIA
1 PL/PROF/GLM FINAL BL
1 PL/PROF/GLM RF SEPIA
i PL/GASLIFT FINAL BL
i PL/GASLIFT RF SEPIA
1 GR/CCL FINAL BL
i GR/CCL FINL.RF SEPIA
i PL/PROFILE FINAL BL
1 PL/PROFILE RF SEPIA
1 PFC/PERF FINAL BL
1 PFC/PERF RF SEPIA
ECC No.
Run # 1 4502.01
Run # 1
Run # 1 4772.03
Run # 1
Run # 1 4844.02
Run # 1
Run # 1 5157.04
Run # I
Run # 1 5167.02
Run # 1
Run # 1 5984.03
Run # 1
Please sign and return to: Atlas Wireline Services
5S~e 2~r. eet ~
/~hors ~_/, ~99518
_~/Attn-~ )d~D. Paulson
Received bv~Z//
Petrot~ical Data
BP Exploration (Alaska) Ino
900 East Benson Boulevard
Anchorage, Alaska 99908
' "~'~ved by
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 31 August 1994
RE: ',. Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
Y-29 (23-04-10-13) 1 PFC/PERF FINAL BL
% PFC/PERF RF SEPIA
Y-33 (32-28-11-13) PFC/PERF FINAL BL
Y-34 (23-34-11-13 PFC/PERF FINAL BL
%~!1.£~ 1 PFO/PERF RF SEPIA
1 GR/CCL RF SEPIA
PFC/PERF RF SEPIA
ECC No.
Run # 1 1215.01
Run # 1
Run # 1 4772.02
Run # 1
Run # 1 4844.01
Run # i
Run # 1 4986.02
Run # 1
Run # 1 5157.03
Run # 1
Run # 1 5167.01
Run # 1
Please sign and retur~t '.~A~l~~Wi~ne~~
{~. %/Attn I /Rodne~ D/. Pau~
Received
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Dates 23 August 1994
RE: Transmittal of Data
Sent by: ANCHORAGE EXPRS
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL $ DESCRIPTION
i PL/GASENTRY FINAL BL
i PL/GASENTRY RF SEPIA
~2,- I L(( C-24 (14-19-11-14)
I PFC/PERF FINAL BL
i PFC/PERF RF SEPIA
¢o- (( c-17
i PL/GASENTRY FINAL BL
i PL/GASENTRY RF SEPIA
r~C-,--7, % E-06 (33-6-11-14)
i CN/GR FINAL BLUELINE
i CN/GR FINAL RF SEPIA
{~ -? ~ W-37 (24-21-11-12)
i PL/GASENTRY FINAL BL
i PL/GASENTRY RF SEPIA
~/0-- ri[ P-13
i PL/LEAKDET. FINAL BL
I PL/LEAKDET. RF SEPIA
i GR/CCL JEWL.FINAL BL
i GR/CCL JEWL.RF SEPIA
~ ~ '{0 ~ W-36
! PL/PROFILE FINAL BL
I PL/PROFILE RF SEPIA
g?_/? N-31
I PL/PROFILE FINAL BL
i PL/PROFILE RF SEPIA
Cont/
Please sign and return ~o.'
Petroteehnical Data Cente~
BP Exploration (Alaska) Ine
900 East Benson Boulevsxd
Anchorage, Alaska 99308
Received by
ECC No.
Run ~ 1 2621.06
Run ~ 1
Run $ 1 3457.05
Run $ 1
Run # 1 3564.01
Run # 1
Run # 1 3573.02
Run ~ 1
Run $ 1 5010.03
Run $ 1
Run $ 1 5025.02
Run ~ 1
Run $ 1 5157.02
Run # i
Run ~ 1 5602.02
Run $ 1
Run # 1 6158.05
Run # 1
RECEIVED
,~aska Oil & Sas Cons. Commission
Anchorage
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 21 January 1994
RE: Transmittal of Data
ECC #: 5157.01
Data: PDK-PORO
Dear Sir/Madam,
Reference: BP
Y-11 ~
NORTH SLOPE, AK
Encloued, please find the data as described below:
Prints/Films: 1
1
Sent by U.S. MAIL
PDK/TEMP FINAL BL
PDK/TEMP FINAL RF
Run # 1
Run # 1
Please sign and return to: Atlas Wireline Services
Petrophysical Services
5600 B Street'
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Date:
RECEIVED
JAN ! 1994,
;Alaska Oil & Gas Cons. Commission
Anchorage
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 18 January 1994
RE: Transmittal of Data
ECC #: 5157.01
Data: PDK-PORO
Dear Sir/Madam,
Reference:
BP
Y-ii ~d
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes:
Sent by U.S. MAIL
PDK LDWG TAPE+LISTER
Run # 1
o/ -1o3 3o
Please sign and return to: Atlas Wireline Services
Petrophysical Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Received by: ~~ /~
Date:
OIL AND GAS CONSERVATION COMMIS ,~
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate Plugging
Pull tubing X Alter casing Repair well
Perforate
Other
2. Name of Operator BP Exploration
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development ,,,
Exploratory
Strafigraphic
Service X
4. Location of well at surface
1433' SNL, 313' WEL, SEC. 33, T11N, R13E, UPM
At top of productive interval
N/A water injection well
At effective depth
1816' NSL, 2644' WEL, SEC. 33, T11N, R13E, UPM
At total depth
1819' NSL, 2637' WEL, SEC. 33, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 10495 feet
true vertical BKB 9668 feet
Plugs (measured)
6. Datum elevation (DF or KB)
KBE = 86.95 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-11~(33-33-11-13) ~ ~
9. Permit number/approval number
80-134/Conservation order 258
10. APl number
50- 029-20513-01
11. Field/Pool
i Prudhoe Bay Field/Oil Pool
Effective depth: measured 10347 feet
true vertical BKB 9523 feet
Junk (measured) Fill @ 10347'MD (10/4/91)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
true vertical
Length Size
Cemented Measured depth True vertical depth
R£¢EiV D
MAY 1 1 199 .
Alaska 011 & Gas Cons. C0m~ss[o~
Anchorage
Tubing (size, grade, and measured depth) 7" 26~, NT80S , NSCC tubing to 9030'MD
Packers and SSSV (type and measured depth) 9-5/8" Baker 'SABL' Packer @ 8943'MD, 7" Otis 'HRQ' BVN @ 2095'MD
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Reoresentative Daily Average Production or In!ection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations x
16. Status of well classification as:
Oil Gas Suspended
Service
Water Injector
17. I hereby certify that t.he foregoing is true and correct--best of my knowledge.
Signed _~,,~'~ ~~ Title WorkoverEn~ineerSupervisor
Form 10-4'04 Rev 0'6/15/88
Date
SUBMIT IN DUPL~ATE
ACTIVITY SUMMARY for WEL~'FROJECT~ 145095
COMPANY: BP/AAI SHARED SERVICE, NORTH SLOPE, AK
FIELD : PRUDHOE BAY
WELL : Y-11I
Page: 1
DRLG RIG : NONE
WO/COMP RIG: NABORS 3S
(COMP) NU ND: 11.0 PL TBG: 13.0
09/29/91 ( 2) POOH W/ 5-1/2" TBG. 9-5/8"@12212' MW: 8.5 Seawater
TD:10495 R/U LINES TO TREE. CIRC. N/D TREE. N/U BOPE. TEST BOPE.
PB:10425 PULL TBG FREE. POOH W/ 5-1/2" TBG.
SUPV:RBL
(145095) DAILY: $ 35,344 CUM: $ 35,344 EFC: $ 616,000
(COMP) OLD PROB: 0.5 PL PBR: 17.5 PL TBG: 6.0
09/30/91 ( 3) POOH. 9-5/8"@12212' MW: 8.5 Seawater
TD:10495 POOH, L/D TBG. RIH W/ BHA #1. ROTATE SLICK STICK FREE.
PB:10425 POOH. NO FISH.
SUPV:RBL
(145095) DAILY: $ 24,400 CUM: $ 59,744 EFC: $ 616,000
(COMP) PL PBR: 14.0 PL PKR: 10.0
10/01/91 ~ 4) PO0~. 9-5/8"@12212' MW: 8.5 Seawater
TD:10495 RIH. ATTEMPT TO BACKOFF SLICK STICK. POOH. NO FISH. RIH
PB:10425 W/ MILL. MILL @ 8940'. POOH.
SUPV:RBL
(145095) DAILY: $ 250,517 CUM: $ 310,261 EFC: $ 616,000
(COMP) PL PBR: 13.0 PL PKR: 11.0
10/02/91 ( 5) MILL ON PKR. 9-5/8"@12212' MW: 8.5 Seawater
TD:10495 POOH. RIH W/ BHA #4. TAG FISH @ 8940' PULL FREE. POOH.
PB:10425 L/D PBR. RIH W/ BHA #5. TAG PKR @ 895%'. MILL ON PKR.
SUPV:RBL
(145095) DAILY: $ 24,166 CUM: $ 334,427 EFC: $ 616,000
(COMP) PL PKR: 24.0
10/03/91 i 6)
TD:10495
PB:10425
SUPV:GDM
POOH. 9-5/8"@12212' MW: 8.5 Seawater
MILL ON PKR F/ 8954'-8957'. CHASE PKR TO TOL @ 9014'
o
CBU. POOH. NO PKR. RIH W/ BHA #6. ENGAGE FISH @ 9010'.
POOH.
(145095) DAILY: $ 23,704 CUM: $ 358,131 EFC: $ 616,000
(COMP) CLN OUT: 19.5 PL PKR: 4.5
10/04/91 (-- 7) POOH~ 9-5/8"@12212' MW: 8.5 Seawater
TD:10495 POOH W/ SPEAR, PKR. RIH W/ BHA #7. TAG FILL @ 9857'
PB:10425 CIRC. CLEAN FILL F/ 9857'-9908'. CIRC. REV CIRC. ~LEAN
SUPV:GDM FILL F/ 9908'-10347'. REV CIRC. POOH.
(145095) DAILY: $ 60,908 CUM: $ 419,039 EFC: $ 616,000
(COMP) CLN OUT: 20.0 TEST CSG: 4.0
10/05/91 ( 8) RIH W/ PKR. 9-5/8"@12212' MW: 8.5 Seawater
TD:10495 RIH W/ CSG SCRAPERS TO 9027'. REV CIRC. DISP W/ SEAWATER.
PB:10425 POOH. RIH W/ TEST PKR.
SUPV:GDM
(145095) DAILY: $ 94,108 CUM: $ 513,147 EFC: $ 616,000
(COMP) CLN OUT: 2.0 RUN COMP: 10.5 TEST CSG: 11.5
10/06/91 (9)
TD:10495
PB:10425
SUPV:GDM
TEST SSSV. 9-5/8"@12212' MW: 8.5 Seawater
SET TEST PKR @ 9120'. TEST LNR LAP. POOH W/ PKR. R/U
OTIS. RIH W/ GR/JB. TEST BOPE. RIH W/ 7" TBG.
(145095) DAILY: $
26,831 CUM: $ 539,978 EFC: $ 616,000
RECEIVED
MAY 11 1992
Alaska Oil & Gas Cons. comm~SSiOt~
Anchorage
ACTIVITY SUMMARY for WE ~ROJECT 145095
COMPANY: BP/AAI SHARED SERVICE, NORTH SLOPE, AK
FIELD : PRUDHOE BAY
WELL : Y-11I
Page: 2
DRLG RIG : NONE
WO/COMP RIG: NABORS 3S
(COMP) NU ND: 13.0 RUN COMP: 7.0
10/07/91 (10) RIG RELEASED 8 02:00 HRS. 9-5/8"812212' MW: 8.5 Seawater
TD:10495 RIH W/ 7" TBG. LAND TBG. N/D BOPE. N/U TREE. TEST TREE.
PB:10425 PUMP 150 BBLS DIESEL. SET PKR 8 8948'. TT 8 9029'.
SUPV:GDM SECURE WELL. RIG RELEASED 8 02:00 HRS, 10/7/91.
(145095) DAILY: $ 43,819 CUM: $ 583,797 EFC: $ 616,000
BP EXPLORATION aP Exl31oration (Alaska)Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
DATE: 11/25/91
T# 83036
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below. If you have any
questions, please contact BP Well Records at (907) 564-4004.
GAS LIFT SURVEY 10/24/91
GAS LIFT SURVEY 10/18/91
INJ
LEAK DET
BRIDGE PLUG
CCL
GAS ENTRY LOG
5 "
10/23/91
10/29/91
10/26/91
11/03/91
15.00-12650.00 CAMCO 2 "
13900.00-14675.00 CAMCO 2/5"
9550.00-10300.00 CAMCO 5 "
12000.00-13240.00 CAMCO 2/5"
9300.00-10180.00 CAMCO 5 "
9250.00-10015.00 CAMCO 5 "
10/29/91 ~1 10200.00-10450.00 CAMCO
Information Control
Well Records
Adrian J. Martin
RECEIVED
DEC 0 1991
Alaska Oil & Gas Cons. Commiss[~ll
Rnch0ra[[~.
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
DATE: 10/08/91
T~ 82906
BP CASED HOLE FINALS
Enclosed is your copy of the materials listed below.
If you have any questions, please contact BP Well .
Records at (907) 564-4004. .
Z-04 /
R-17 ~--
Y-11~-"-
D-08 ~'~
D-15 ~
Y-35
CL~q- 0t2 5'O 10/03/91 #1 9260.000
PFC~I-oIGg- 0 09/24/91%1 10350.00
CL ~0-015~- O 09/25/91 ~1 8800.000
CCL/PERF'3q'°°$~-0 09/27/91 ~1 8670. 000
CUTTER/PUNCHER~O-O0~.O 10/02/91 #1
SCH 5
PLS ~J-O0 ~'0 09/28/91 #1
ATLAS 5
9658.000
10560.00
8965.000
10469.00
9000.000
10900.00
ATLAS
ATLAS
ATLAS
ATLAS
9220.000
11290.00
Information Control
Well Records
Adrian J. Martin
RECEIVED
OCT 1 8 1991
~laslm Oil & Gas Cons. commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :03/15/91
T#:82226
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
"'-D-10
'~M-21
----Y-29
"'Y-29
'---Y-29
"'-Y-29
"~ X-07
Production Log 03/10/91 #1 10800-11100 Sch 5"
Production Log 03/09/91 #1 8850-9200 Sch 5"
CBT 03/09/91 #1 12480-13422 Sch 5"
CET 03/09/91 #1 12480-13445 Sch 5"
CNL 03/10/91 #1 12900-13447 Sch 5"
Completion 03/10/91 #1 12470-13426 Sch 5"
Leak Det. 03/03/91 #1 7550-10150 Camco 5"
Inj 03/04/91 # 1 9550~9865 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage. Alaska 99519-6612
(907) ssi-s111
TO: DISTRIBUTION Date: 01/02/91
T#:81916
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINAL~..
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
'. S-06 PERF 12/22/90 #1 10000-10450 SCH 5"
'" S-32 PERF 12/17/90 #1 9847-10446 SCH 5"
~ X-09 PERF 12/25/90 #1 11980-12298 SCH 5"
,.X-15 PERF 12/27/90 #1 9490-9964 SCH 5"
,,. Y-11 LEAK DET 12/23/90 # 1 7240-8993 SCH 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
JAN 1 fi 1991
Alaska 0il & Gas Cons. Commission
Anchorage
BP EXPLORATION
To: AOGCC
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Date: January 7, 1991
Crc.,: PBU Production Engineering Supervisor
Subject: Y-11i Request for Variance
A variance is requested to allow continued injection in well Y-1 li until a rig
workover can be performed to eliminate downhole communication between the
tubing and inner annulus. Remedial actions including a permanent patch (set
11/27/90) have failed to eliminate the source of communication. As per the
attached memo, a rig workover is being planned to replace the corroded tubing and
ensure isolation between the inner annulus and injection tubing. Well Y-11will be
monitored weekly to ensure that the annuli do not exceed the AOGCC prescribed
maximum surface pressure.
Any questions or requests for additional information can be directed to the Prudhoe
Bay Production Engineering Supervisor, Roddy Bachman or Ross Warner, at (907)
659-4641.
RCB/prh
cc: Well File
Bob Gerik
fR. C. Bac'l~man
RECEIVED
STATE OF ALASKA
O~, OIL AND GAS CONSERVATION COMMI .
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well __
Alter casing __ Repair well __ Plugging ~ Time extension Stimulate __
Change approved program ~ Pull tubing __ Vadance X Perforate __ Other__
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE--86.95 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
4. Location of well at surface 8.
1433' SNL, 313' WEL, SEC. 33, T11N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1817' NSL, 2637' WEL, SEC. 33, T11N, R13E, UPM
At total depth 11.
1819' NSL, 2673' WEL, SEC. 33, T11N, R13E, UPM
12. Present well condition summary
Well number
Y-11RD (33-33-11-13) PBU
9. Permit number
80-134
10. APl number
50- 029-20513-01
Field/Pool
Prudhoe Oil Pool
Total depth:
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured 10495 feet Plugs (measured)
true vertical BKB 9668 feet
measured 10314 feet Junk (measured)
true vertical BKB 9491 feet
Length Size Cemented
110 20x30 8 c.y.
2626 13 3/8 4301 c.f.
9494 9 5/8 1450 c.f.
JAN l 0 1991
fill at 10314' MD (11~6) _
Measured depth True
BKB
146 146
2662 2662
9530 8730
measured
..
1439 7 462 c.f. 9033-10472
9662'-9685' (Sag R)
9760'-9768', 9776'-9790', 9797'-9806', 9814'-9875' (Ivishak)
8250-9646
truevertical subsea 8771'-8793' (Sag R)
8865'-8977' (four Ivishak intervals)
Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8973' with 4 1/2" tailpipe to 9079'. Inside is a 5-1/2" Merla Tubing patch
7370' - 7356' and 4-1/2" DGXL packer/tailpipe set in the 4-1/2" tailpipe at 8995'
Packers and SSSV (type and measured depth) 9 5/8" Baker SAB packer at 8973'; 5 1/2" BVN at 2005'
13. Attachments Description summary of ~)roposal X Detailed operations program ~ BOP sketch
14. Estimated date for commencing operation
BY 3RD QUARTER 1991
16. If proposal was verbally approved
Name of approver
Date approved
15. Status of well classification as:
Oil ~ Gas __ Suspended
Service water injection well
17. I hereby ce_j:[ify that the foregoin~Qg is true and correct to the best of my knowledge.
FOR COMMISSION USE ONLY
Date 7JAN 1991
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test ~ Location clearance ~
Mechanical Integrity Test __ Subsequent form required 10-
Approved by order of the Commission
t3Y LONNIE C. SMITH
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE ~
BP EXPLORKTION
Memorandum
To: Lisa Mc Keague
D~te: December 25, 1990
From: P.E. Supervisor
Subject: Y-11i Rig Work0ver Requirement
A rig workover is recommended for Y-11i to repair a leak in the 5 1/2"
tubing at 7376' BKB. The well has had a extended history of downhole
communication between the tubing and inner annulus. Leak detection
logs run 11-4-90 confirmed a leak immediately above the #4 glm. A
Merla tubing patch was run 11-27-90 in an attempt to repair the leak.
Well continued to build inner annulus pressure when on injection. Leak
detection logs run on 12-23-90 showed tubing to be leaking around the
Merla patch.
No further work is planned by the N.S. Production Engineers. The patch
is not retrievable and no viable alternatives exist to repair the leak
besides a rwo.
Any questions or requests for additional information should be directed
to the Production Engineering Supervisor.
RLW/BML/KEY
Ct2
WELL FILE
PRODUCTION MANAGER
FIELD SUPERINTENDENT
FIELD SUPERVISOR
P.B.R.E.
BURT LITTLEFIELD
BRIAN ROSE
JOHN OLDENBURG
BOB GERIK
AK 3407-7
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIB.UTION Date :12/26/90
T#:81955
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
S-25 Prod-F 12/05/90 #1 9150-9564 Camco 5"
Y-11 Jewelry Log 12/09/90 #1 8800-9800 Camco 5"
Y-06 Jewelry Log 12/09/90 #1 9800-10600 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
RECEIVED
JAN 1991
Naska Oil & Gas Cons. Commission
j~chorage
To: AOGCC Commissioners Date:
R. C. Bachman/'~¢~
Production Engineering Supervisor
From:
~? ~;II ,~u~ /l~,'e~~ I~ ~
10 Dec 90
Subject: Variance for Y-11i to Continue Injection
Injection well Y-1 li has developed communication from tubing to inner annulus.
The well annulus will pass a Mechanical Integrity Test but over a period of 12
hours will build to injection pressure (still within safe operating limits).
The wellhead has been tested and verified that the leak is downhole.
Initial leak hunt logs indicated the downhole leak to be at an area between
7370 and 7381 MDBKB and possibly at 7356. We set a Teleydne Merla patch
over the first interval. This has reduced the communication between tubing and
annulus to that mentioned above in which it will pass an MIT.
Spinner and temperature logs have been run on Dec 9 in an attempt to locate
the leak but it is too small. We will likely be plugging the well and running a
noise log in the near future to locate and repair if possible.
We are requesting a variance to continue injection until the leak is found and
repaired. Daily close monitoring of the well's conditions will continue.
CC:
Y-11i
GL PE
I ECEIVED
DEC 1 4 1990
0il & Gas Cons. Commission
N~ch0rage
, STATE OF ALASKA
ALA OIL AND GAS CONSERVATION COMMISS ,~
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request:
Abandon __ Suspend __ Operation Shutdown __ Re-enter suspended well __
Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate __
Change approved program __ Pull tubing Variance X Perforate __ Other __
2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB)
BP Exploration (Alaska) Inc. Dev~opment X KBE = 86.95 AMSL feet
Exploratory
3. Address Straligraphic__ 7. Unit or Property name
P. O. Box 196612, Anchorage, Alaska 99519-6612 Service ~ Prudhoe Bay Unit
4. Location of well at surface 8. Well number
1433'SNL, 313°WEL, SEC. 33, T11N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1817' NSL, 2637' WEL, SEC. 33, T11N, R13E, UPM
At total depth
1819' NSL, 2673' WEL, SEC. 33, T11N, R13E, UPM
Y-11RD (33-33-11-13) PBU
9. Permit number
80-134
10. APl number
50- 029-20513-01
11. Field/Pool
Prudhoe Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
true vertical
Length
..
10495 feet
BKB 9668 feet
10314 feet
BKB 9491 feet
Plugs (measured)
Junk (measured) fill at 10314' MD (11/86)
Size Cemented Measured depth
110 20 x 30 8 c.y. 146
2626 13 3/8 4301 c.f. 2662
9494 9 5/8 1450 c.f. 9530
..
1439 7 462 c.f. 9033-10472
measured 9662'-9685' (Sag R)
9760'-9768', 9776'-9790', 9797,-9806', 9814'-9875' (Ivishak)
true vertical subset 8771'-8793' (Sag R)
8865'-8977' (four Ivishak intervals)
Tubing (size, grade, and measured depth) 5 1/2" L-80 to 8973' with 4 1/2" tailpipe to 9079'
Packers and SSSV (type and measured depth) 9 5/8" Baker SAB packer at 8973~ 5 1/2" BVN at 2005'
True vertical depth
BKB
146
2662
8730
8250-9646
RECEIVED
DEC 1 41990
Alaska Oil& Gas Cons. Comm't~
Anchorage
13. Attachments
Description summary of proposal X Detailed operations program
BOP sketch
14. Estimated date for commencing operation 15. Status of well classification as:
DEC 1990
16. If proposal was verbally approved Oil~ Gas ~ Suspended
Name of approver Date approved Service water iniection well
17. I hereby ~_~ that the~regoing~true and correct to the best of my knowledge.
Signed "'//~" ~,~/.~-r.,~-~ /, .,/C..~~ Title PRODUCTION ENGINEERING SUPERVISOR
Y - ' FOR COMMISSION USE ONLY
Date 8 DEC 1990
Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance
Mechanical Integrity Test ~ Sul~sequent form required 10~-c~ ~
I Approval No. p~,,_ o~7 ~
!
Approved by order of the Commission
Form 10-403 Rev 06/15/88
Commissioner
Approved Copy
Returne~l
SUBMIT IN TRIP~I'I'CATE
~siou
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevarcl
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :12/03/90
T#:81858
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
S-26 Prod-F 11/29/90 #1 8850-9384 Sch 5"
S-28 Perf 11/23/90 #1 9300-10029 Sch 5"
W-04 CNL 11/28/90 #1 11500-12109 Sch 5"
Y-11 Comp 11/25190 # 1 7250-9762 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
Pr:. EiVED._,_
DEC ] 0 990
Alaska Oii& Sas Cons. Commission
An~i~crage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :11/20/90
T#:81840
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
W-12 Prod-F 10/31/90 #1 2938-13942 Camco '5"
X-10 Leak Det 11/03/90 #1 9550-9934 Camco 5"
Y,11 Leak Det 10/13/90 #1 7300-7490 Camco 5"
¥~'1'1 Leak Det 11/04/90 #1 7250-8149 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
ARCHIVES
R,F.:CEIVED
/VOV 1990
Alaska Oil & G~.$ Cons. $O~issior~
Anchorag~
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :11/13/90
T#:81798
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
B-12 Jewelry Log 10/26/90 #1 9000-9400 Camco 5"
M-12 Tubing Tail 10/27/90 ~#1 9700-10168 Camco 5"
M-12 INJ 10/27/90 #1 · 9700-10168 Camco 5"
M-28 INJ 10/21/90 #1 8650-8945 Camco 5"
M-28 PITS 10/29/90 #1 8600-8935 Camco 5"
S-24 CCL 10/20/90 #1 9400-10100 Camco 5":
' Y-11 LEAK DET 10/13/90 #1 981.4-9875 Camco 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
ARCHIVES
RECEIVED
NOV 2 0 1990
Alaska 0il & Gas Cons. Commission
Anchorage
BP EXPLORATION
April 24, 1989
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
PO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well Y-11 RD (33-33-11-13) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
Yours very truly,
BJP:JAM
Enclosures (4)
cc: L. Burke (MB12-1)
Well Records (LR2-1) w/10
Well File
Alaska oil &' 8as Cons.
:Anchorage
._,KA OIL AND GAS CONSERVATION CO MI .~N
REPORT OF SUNDRY WELL OPERATIONS
Plugging
Repair well
5. Type of Well:
Explorall3ry
Slratigraphic
Service
1. Operations performed: Operation shutdown
Pull tubing
2. Name of Operator
BP Exploration (Alaska) In=
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1433' SNL, 313' WEL, SEC. 33, T11N, R13E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1817' NSL, 2637' WEL, SEC. 33, T11N, R13E, UPM
At total depth
1819' NSL, 2673' WEL, SEC,. 33, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 10495feet
true vertical BKB 9668feet
Stimulate
Alter casing
Perforate X
Other
6. Datum elevation (DF or KB)
KBE = 86.95 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-11RD (33-33-11-13) PBU
9. Permit number/approval number
80-134 / 9-191
10. APl number
50- 029-20513-01
11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Effective depth: measured 10314feet
true vertical BKB 9491feet
Junk (measured) fill at 10314' MD (11/86)
Casing Length
Structural --
Conductor 110
Surface 2626
Intermediate 9494
Production --
Liner
Perforation depth: measured
true vertical
Tubing (size, grade, and measured depth)
Size Cemented Measured depth
20 x 30 8 c.y. 146
13 3/8 4301 c.f. 2662
9 5/8 1450 c.f. 9530
1439 7 462 c.f. 9033-10472
9662'.9685'
(Sag R)
9760'-9768', '97~6'-§790', 9797'-9806', 9814'-9875' (/vishak)
subsea 8771'-8793' (Sag R)
8865'-8977' (four Ivishak intervals)
5 1/2" L-80 to 8973' with 4 1/2" tailpipe to 9079'
True vertical depth
BKB
146
2662
8730
8250-9646
Packers and SSSV (type and measured depth)
13. Stimulation or cement squeeze summary
Intervals treated (measured)
14.
RECEIVED
9 5/8" Baker SAB packer at 8973'; 5 1/2" BVN at 2005'
Treatment description including volumes used and final pressure
Reoresentative Daily Averaoe Production or In!ection D~,t~I
OiI-Bbl
Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 4100 1370
Subsequent to operation
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations ×
17. I hereby ce~i~that the~/~ trend
Form 10404 Rev 06,~r~/88 ~
3900
16. Status of well classification as:
1280
Oil Gas Suspended Service water iniection well
correct to the best of my knowledge.
Title Supervisor Waterflood/Miscible Flood Date ./~.//~'~'
SUBMIT IN DUPLI~CAT~
WELL Y-IIRD ¢33-33-11-13~ PBU
ADDtL. PERFORATION OPERATIONS
Thc following Sag R. interval was perforated April 5, 1989 using Schlumberger 3 3/8"
carrier guns at 6 spf:
9662' - 9685' MD BKB (Ref. BHCS, 12/7/80)
A lubricator was installed and tested to 3500 psi for all well work. The well was
returned to ~ immediately following perforating operations.
jm
4/19/89
BP EXPLORATION
HOUSTON
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
RESERVOIR
REFERENCE:
Bp'CASED HOLE FINAL LOGS
BP EXDIorat~on (Alaska) Inc.
900 Eas~ Benson Boulevard
FO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561o5111
DaTe: 04-07-89
T~: 79941
The following material Is being submi~ed herewith. Please acknowledge receipt by
slgnlng a copy of this le~-~er and returning IT To this office:
C-21 Completion 03-31 -89 #I 7950-9201 Sch 5"
D-26 Completion 03-02-89 #1 9690-9930 Sch 5"
K-lO Completion 04-01-89 #1 9440-10070 Sch 5"
U-3i Completion 04-02-89 #1 8910-9492 Scb 5"
U-10i Copmletion 04-02-89 #1 9450-10104 Sch 5"
Y-3i Completion 04-04-89 ~.1 0-9280 Sch 5"
Y-09 Completion 04-05-89 #1 10120-10450 Sch 5"
Y-11i Completion 04-05-89 #1 9546-9850 Sch 5"
Z-01 CNL (2 1/2")03-31-89 #1 10100-10784 ' Sch 5"
Y-05i Completion 04-04-89 #~ 9680-9900 ,Sch 5"
Rece i ved
DaTe
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
March 9, 1989
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well Y-11RD (33-33-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perforate the well.
Yours very truly,
Supervisor Waterflood & Miscible Flood
BJP:JAM
Enclosures (9)
cc: L. Burke (MB12-1)
Well File
STATE OF ALASKA
,~KA OIL AND GAS CONSERVATION COMMI N
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon Suspend
Alter casing Repair well
2. Name of Operator
BP Exploration (Alaska) Inc.
$. Address
P. O. Box lg6612, Anchorage, Alaska gg51g-6612
4. Location of well at surface
1433' SNL, 313' WEL, SEC. 33, T11N, F113E, UPM
At top of productive interval
N/A - water injection well
At effective depth
1817' NSL, 2637' WEL, SEC. 33, T11N, F113E, UPM
At total depth
181g' N SL, 2673' WEL, SEC. 33, T11N, R13E, UPM
12. Present well condition summary
Total depth: measured 10495 feet
true vertical BKB g868 feet
Operation Shutdown ~
Plugging
Pull tubing Variance
5. Type of Well:
Development x
Expkxal~
Slr~gmphic
Re-enter suspended well
Time extension Stimulate
Perforate X Olher
6. Datum elevation (DF or KB)
KBE = 86.95 AMSL feat
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
Y-11RD (33-33-11-13) PBU
9. Permit number
80-134
10. APl number
50- 029-20513-01
11. Field/Pool
Prudhoe Oil Pool
Plugs (measured)
Effective depth: measured 10314 feet
true vertical BKB 9491 feet
Junk (measured) fill at 10314' MD (11/86)
Casing Length Size Cemented Measured depth
Structural --
Conductor 110 20 x 30 8 c.y. 146
Surface 2626 13 3/8 4301 c.f. 2662
Intermediate 9494 9 5/8 1450 c.f. 9530
Production --
Liner 1439 7 452 c.f. 9033-10472
Perforation depth: measured 9760'-9768', 9776'-9790', 9797'-9806', 9814'-9875'
true vertical subsea
8865'-8977' (four intervals)
Tubing (size, grade, and measured depth) 5 1/2"L-80 to 8953' with 4 1/2" tailpipe to 9079'
Packers and SSSV (type and measured depth) g 5/8" Baker SAB packer at 8953'; 5 1/2" BVN at 2005' ~,~.,i. ~r~cho~'a§e
13. Attachments Description summary of proposal x Detailed operations program BOP sketch
True vertical depth
BKB
146
2662
8730
8250-9646
14. Estimated date for commencing operation I 15. Status of well classification as:
February 1989
16. If proposal was verbally approved Oil Gas Suspended
Name of approver Date approved Service water injection well
17. I hereby cert~ that the foregoing is true and correct to the best of my knowledge.
Si~lned Title Supervisor Waterflood/Miscible Flood
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity ~ BOP Test Location clearance ~
Mechanical Integrity Test~ Subsequent form required 10- ~,-~/
~pproved Copy
ORIGINAL SIGNEO BY · Returned
Approved by order of the Commission I I'lta~lF C,. SMITH
Form 10-403 Rev 06/15/88
I oprow, .o. 9 "/p/
_~ ~._~~ commissioner
SUBMIT IN TRIPLICATE
WELL Y-IIRD ¢33-33.11-13~ P]}IJ
ADD'L. PERFORATION PROPOSAL
We propose to perforate the following. Sag River interval during February 1989:
9662' - 9685' MD BKB (Ref. BHCS, 12/7/80)
A lubricator will be installed and tested to 3500 psi for all well work. Thc well will be
returned to injection immediately following perforating operations, then tested.
jm
2/'10/89
FLOW TUBES
& PACKOFF
BOWEN
(
PACKOFF
GREASE SEAL
FLOWTUBE
PUMP
FLOWLINE
FLOWLINE
VALVE
GREASE LINE
GREASE
L"' MANIFOLD
GREASE
PUMP
RISER
BOP
...,-GREASE
RESERVOIR
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: 11/21/86
TO: MOBIL TI: 77539
PHILLIPS
-~' · STAT~. OF' A~AS~A
GEOSC IENCES
STANDARD
ALASKA PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to thls offlce:
F-5
G-27
G-27
H-20
J-1
N-7
Y-11
Y-24
Collar Log 09/19/86 #1 9436-9659 Sch 5"
GR 09/16/86 #1 6965-10775 Sch 5"
Gun Positioning 09/17/86 (/2 8250-9025 Sch 5"
Production Profile 11/10/86 #1 9800-10160 Camco 5"
Squeeze GUn Record 09/19/86 #1 8800-9100 Sch 5"
Production Profile 11/10/86 #1 10100-10570 Camco 5"
' Flowmeter il/12/86 (/2 9600-10314 Camco 5"
Flowmeter 11/15/86 #1 13150-13430 Camco 5"
Received
Date
k vn,! O| the o~,c),nol Stonc|f~,(| 0,1Co,npnny
fou,,ded ,n Cle.el¢~,,{J. C~,o. ,n 1870
Victoria Aldridge
INFOR~b~TION CONTRC~
Well Records LR2-1
Standard Alaska ~'
Production Co~
900 East Benso,~,, ~.le~_.o
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 564-5111
May 6, 1986
51'ANDARD
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Well Y-11RD (33-33-11-13) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for
Sundry Approvals, for the above-named well. This contains
our proposal to stimulate the well.
Yours very truly,
JAB: JAM ~u
Enclosures
cc: J. L. Haas, MB12-1
Well Records, LR2-1
Y-11 Well File
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
" j~. STATE OF ALASKA
~~S IL AND GAS CONSERVATION ([ /1~ ION
SU. R¥ A.. RovA,s
1. Type of Request: Abandon -' Suspend - Operation Shutdown ~ Re-enter suspended well ~ Alter casing ~
Time extension- Change approved program-_ Plugging ~ Stimulate ~. Pull tubing- Amend order "- Perforate- Other-
2. Name of Operator
STANDARD ALASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
1433' SNL, 313' WEL, Sec. 33, TllN, R13E, UPM
At top of productive interval
1817' NSL, 2485' WEL, Sec. 33, TllN, R13E, UPM
At effective depth
1818' NSL, 2621' EWL, Sec. 33, TllN, R13E, UPM
At total depth
1819' NSL, 2607' EWL, Sec. 33, TllN, R13E, UPM
5. Datum elevation (DF or KB)
KBE = 86.95 feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
Y-11RD f33-33-11-13) PBU
8. Permit number
80-134
9. APl number
50--029-20513-01
10. Pood
Prudhoe Oil Pool
11. Present well condition summary
Total depth: measured
true vertical
10495
9668
feet Plugs (measured)
feet ~BKB
Effective depth: measured
true vertical
10425
9600
feet Junk (measured)
feet BKB
Casing Length
Structural .-
Conductor. 59'
Surface 2611' '
Intermediate 9479 '
Production --
Liner
Perforation depth:
Size
Cemented
8 cu.yds.
4301 c.f.
1450 c.f.
20"x30"
13 3/8"
9 5/8"
1439' 7" 462 c.f.
measured
9760' - 9875' (four intervals)
true vertical (subsea)
8865' - 8977'
Measured depth
110'
2662'
9530'
9033'-10472'
True Vertical depth
BKB
110'
2662'
8730'
8250'-9646'
Tubing (size, grade and measured depth)
5 1/2" L-80 to 8953' with 4 1/2" tailpipe to 9079'
Packers and SSSV (type and measured depth)
9 5/8" Baker SAB packer at 8953'; 5 1/2" ball valve nipple at 2005'
12.Attachments Description summary of proposal ~-~ Detailed operations program ~
BOP sketch
13. Estimated date for commencing operation
May 1986
14. If proposal was verbally approved
Name of approver
Date approved
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
S~~/~,_~~ Title Supervisor Production Operations Date ,,~,~'~
. /z-r/~,,.,. A. Bragg 6'(/ Commission Use Only
Conditions of approval
Approved by
Notify commission so representative may witness I Approval No.
[] Plug integrity [] BOP Test [] Location clearance
I
Approved Cor~',.~,
~.®turned
or er o,
Commissioner the commission Date ,,~'-'-
Form 10,403 Rev 12-1-85
Submit in triplicate
'Injection Well Y-11RD (33-33-11-13)
MUD ACID STIMULATION PROPOSAL
A bullheaded three-stage mud acid stimulation is proposed for the
following perforated intervals in water injection well Y-11.
9760' - 9768' MD BKB
9776' - 9790' MD BKB
9797' - 9806' MD BKB
9814' - 9875' MD BKB
Each of the first two stages will consist of the following:
1550 gal. 15% HCl
3100 gal. 12% HCl - 3% HF
3100 gal. 3% NH4Cl
775 gal. gelled NH4Cl w/775# BAF
The third stage will consist ofthe following:
1550 gal. 15% HC1
3100 gal. 12% HCl - 3% HF
3100 gal. 3% NH4Cl
1000 gal. methanol
5/5/86
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
September 18, 1 985
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage~ Alaska 99501
Attention' i,ir~ C,V, Chatterton
Well A-3'.A-8; A-27' B-13, H-9"Y-6; Y-11;'and Y-18 PBU
Gentlemen:
Enclosed in duplicate, is Form 10-403' Sundry Notices and Reports on .
Wells for the above named wells; These contain our subsequent
reports of having converted them from oil wells into water injection
wells,
Yours very truly,
k
SOHIO ALASKA PETROLEUM COMPANY
M. D. 'Martin
Senior Petroleum Engineer
RECEIVED
Enclosures
OCT 0 7 1985
CC:
T. N. Tyler. (MBg-2)
Well Records, (LR2-1)
Drilling Well File #17
Alaska 0il & Gas Cons. Comrnission
Anchorage
STATE OF ALASKA JM
ALASKA OIL AND GAS CONSERVATION C MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTHER []
2. Name of Operator 7. Permit No.
SOHIO Alaska Petroleum Company 80-] 34
3. Address 8. APl Number
P. O, Box 196612, Anchorage, Alaska 9951g-6612 5o-029-20513-01
4. Location of Well
At Surface'
1433' SNL,
9. Unit or Lease Name
Prudhoe Bay Unit
313' WEL, Sec. 33, TllN, R13E, UPH
5. Elevation in feet (indicate KB, DF, etc.)
__ KBE : 89; 65' AMSL
12.
6. Lease Designation and Serial No.
ADL 28287
10. Well Number
Y-11 R/D#1 ( 33-33-11 -13 )PBU
11. Field and Pool
Prudhoe Bay
Prudhoe 0il Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing
Stimulate [] Abandon [] Stimulation [] Abandonment
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
This well was converted from a Prudhoe Bay production well into a water
injection well for Western Peripheral Wedge Zone (W~P~W~Z~) on
September 14, 1985~ Water was injected through the following perforations at
4 s~p~ fl
9760' -- 9768' BKB
9776' -- 9790' BKB
9797' -- 9806' BKB
9~14' -- 9875' BKB
'lf~l I hereby certify that the foregoing is t~rrect
'Phe space below for Commission use
RECEtVED
OCT 0 ? 1985
Alaska 0ii & Gas Cons. Commission
Anchorage
to the best of my knowledge.
Senior Petroleum Engineer
Title
Conditions of APproval, if any:
Approved by
By Order of
COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
INDEXED
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
To~SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL
PHILLIPS
STATE
BPAE (Transmittal Only)
3111 "C" STREET
ANCHORAGE. ALASKA
TELEPHONE {907l 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
Date: 09/16/85
T#: 76433
REFERENCE:
SOHIO FINAL DATA - PRESSURE SURVEY DATA
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
Static 08/21/85 Camco
Static 09/02/85 Camco
Static 07/09/85 Camco
Static 09/05/85 Camco
Static 08/22/85 Camco
Pres.Drawdown 08/07/85 Camco
Pres.Drawdown 07/12/85 Camco
Static 09/09/85 Camco
BHPD & PBU 09/01/85 Camco
Static 08/26/85 Camco
Static 08/28/85 Camco
PBU &-BHPD 08/12/85 GO
PBU 07/11/85 Camco
PBU & BHPD 08/15/85 GO
Flowing Gradient 08/20/85 Camco
Step Rate Test 05/29/85 Sch
Data Frac 05/29/85 Sch
Static 09/05/85 Camco
Static 09/05/85 Camco
Static 08/17/85 GO
Static 08/30/85 Camco
Static 09/04/85 Camco
Flowing Gradient 08/27/85 Camco
Static 09/07/85 Camco
Flowing Gradient &~RHPD 08/26/85
Camco
RECEIVED
DATE
Victoria Aldridge LR2-1
Technical Documentation
Records Management
SOHIO ALASKA PETROLEUM COMPANY
SFO
ARCO
CHEVRON
EXXON
,o. SFO/UNIT/STATE:
TEXACO
(-Marathon) : MOBIL
PHILLIPS
STATE OF AK
BPAE
311 I "C" STREET
ANCttOIqAGE. ALASKA
TELEPHONE [9071 265-0000
MAIL' POUCH 6-6 ! 2
ANCHORAGE. ALASKA 99502
Date: 09/1,)/85
TI/: 76431
REFERENCE:
SOHIO CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:--
~ X~A-16 ' DFT 08/22/85 #1 10500-11400 "Camco 5"
% X2 A-34 -" GCT Gyro Survey 05/16/85 #1 SURF-9650 Sch 5"
~"~'F-19" 'C~-'~ 01/20/85 l/1 11622-12814 Sch 5"
"~w H-9 f Completion Record 06/21/85 I/2 8657-9830 Sch 5"
"J-3-- CET · 03/22/85 #1 9500-10088 Sch 5"
~J Q-1 / CET - (RE-RUN) 03/31/85 t/1 8900-9770 Sch 5"
'~'~ R-17~' PLS 08/09/85 #1 10330-11000 Dres 5"
~'~Y-11" DFT 08/24/85 t/1 9650-10300 Camco 5"
'~ '~Y-11" Spinner 08/24/85 #1 9650-10300 Camco 5"
~ '~ Y-18-~ Completion Record 06/20/85 t/2 10810-11270 Sch 5"
RECEIVED
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502~3612
August 21, 1985
Alaska'Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention' Mr. C.V. Chatterton
Wells A-3, A-8, A-16, A-27, B-13, H-9, U-3, U-9,
Y-3, Y-6, Y-11, and Y-18 PBU
Gentlemen:
Enclosed in triplicate, is Form 10-403, Sundry Notices and Reports
on Wells, for the above named wells. These contain our proposals to
convert them from oil wells into water injection wells.
Yours very truly,
Michael D. Martin
Sr. Petroleum Engineer
MDM : kkm '
08l 9~ :0639N
Enclosures ,
cc' T. N. Tyler
Well Records (LR2-1)
Well File #17
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL){~ OTHER []
2. Name of Operator
SOHIO Alaska Petroleum Company
3. Address
P. O. Box 6612, Anchorage, Alaska 99502
4. Location of Well
At Surface:
1433' SNL, 31 3' WEL, Sec. 33, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
__ KRE = 89:6~;' AMSL
12.
I6. Lease Designation and Serial No.
AnL _28287
7. Permit No.
80-134
8. APl Number
5oq)29-2051 3-01
9. Unit or Lease Name
Prudhoe [lay Unit
10. Well Number
Y-11 R/D#1 (33-33-11-13 )PBU
11. Field and Pool
Prudhoe Bay
Prudhoe 0il Poo!
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other ~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
With reference to the previous Sundry Notices dated: January 15, 1982;
August 17, 1982; April 27, 1985; and July 3, 1985, for the perforation of Y-11 in
the 7" liner~ it is intended to convert this Prudhoe Bay production well into a
seawater injection well for WPWZ Waterflood Project. Water will be injected
through perforations (4 spf) at'
9760' -- 9768' BKB
9776' -- 9790' BKB
9797' -- 9806' BKB
9814' -- 9875' BKB
CONS.
nch0ra~
l!~ I hereby certify that the foregoing is t~5~a~ correct to the best of my knowledge.
r~t~e Senior Petroleum £ng~eer
The space belo~ for Commission use
Date
Conditions of APproval, if any:
Approved by.
O~IB!NA[
BY i{AIU~Y W, KIIGL[il
~ppro'veci Gopy
Jieturned
By Order of
COMMISSIONER the Commission
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502~612
July 3, 1985
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well Y-11 R/D #1 (33-33-11-13) PBU
Gent lemen:
Enclosed, in duplicate, are the following
well:
1. Form 10-407, Completion Report;
forms
for the
above-named
2. Form 10-403, Sundry Notice and Reports on Wells;
3. Form 10-404, Monthly Report of Drilling and Workovers.
JAB:~H:elw
Enclosures
Yours very truly,
Br~gg ~ -
District Petroleum Engineer (Acting)
cc:
T. N. Tyler
Well Records (LR2-1)
Drilling Well File #17
RECEIVED
J U L 0 9 198,5
Alaska 0il & Gas Cons. Commission
Anchorage
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Sohio Alaska Petroleu~ Company 80-134
3. Address 8. APl Number
?,0, Box 6612~ Anchorage, Alaska 99502 50-029-20513-0]
4. Location of well at surface 9. Unit or Lease Name
1433' SNL, 313' WEL, Sec. 33, TllN, R13E, OPM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
1817' NSL, 2485' WEL, Sec. 33, TllN, R13E, UPM ¥-]] R/~I (33-33--11-!3)
At Total Depth 11. Field and Pool
1819' NSL, 2607' EWL, Sec. 33, TllN, R13E, gPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe 0il Pool
KBE = 89.65' AMSL ADL 28287
12. Date Spudded 13. Date T.D. Reached ~~_...._,.~Susp. or Abanq~,~ 115. Water Depth, if offshore 16. No. of Completions
10/24/80 12/7/80 /~':':::7:':'"'~ _ .~.~,~
IZ///80~,,,,,,)1~-'¥' ~r~t~ feetMSLI one
17. Total Depth (M D+TVD) 18. Plug Back Depth (MD+TVE~~ Survey I 20. Depth where SSSV set I 21. Thickness of Permafrost
10~95~M~ 9668'TVD 10425'MD 9600'TVD YES~] NOD -I 1995 feetMg I 2035'
22. Type Electric or Other Logs Run
DTT./SP/C~, DT~,/SP/B~CS/~, F~C/C~T,/~/Cal, CBT,/~)T,/CC~./C~
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" x 30"Insulate~ Conductcr Surfac,~_ 110 36" 8 cu. yds. concrete
13 3/8" 72# L-80 Surfac,~., 2662 17 1/2"4301 cu. ft. Permafr( st II
9 5/8" 47# L-80 Surfac,~_ 9530 12 1/4"1320 cu. ft. Class G: 130 cu.ft.P~maf
7" 29# L~Z80 90.33' 10472 8 1/2" 462 cu. ft. Class G w/18% salt
24. Perforations'open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) ' '~/~D '~TV~)s~; SIZE DEPTH SET (MD) PACKER SET (MD)
Prudhoe Oil Pool top: 9760' 8'865' 5 1/2" 9079' 8953'
Bottom: 9875 ' 8977 '
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
9760'-9768' BKB (8865'-8873' TVDss) ' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9776'-9790' BKB (8881'-8894' TVDss) 9810-9660'· 120 cu.ft, Class G.w/18% sait
9797'-9806' BKB (8901'-8910' TVDss) 5300-5500" 164 cu.ft. Class G w/18% salt
9814'-9875' BKB (8917' 8977' TVDss) Plug back & aban,.on wa11 ¥-1 ] (34-~-11-1
·
.
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
July 20, 1982I Flowing ' '
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
., TEST PERIoD'I~' ' '
· , ·
i~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
FlowTubing Casing Pressure CALCULATED. _.. : ·
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
:
RECEIVED
--JUL 0 9
Alaska Oil & Gas Cons. Commission
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOGIC MARKERs FORMATION
NAME tnclu~?, i,-~:,. :.,i-':,:t~,.' .- . ~.. ,:
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
,,,
BKB Subsea
Sag River SST 9668' 8776'
Shublik 9684 ' 8792 '
Ivishak 9757 ' 8862 '
·
31. LIST OF ATTACHMENTS
3~. I hereby certify that the foregoing is true and correct to the best of my knowledge
~~ ~/~~ Acting District
,s~i!~ Title Petroleum Enginee~ate
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of. Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, Water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces, on this form and in any attachments.
Item 16 and 24: If this well is comPleted for separate :production from more than one interval (multiple
comp!etion), so state in item 16, and in~ij.tem 24 show the producing intervals for only the interval rePOrted
in ite~ 27. Submit a separate form for each additional interval'to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
Form 10-407
STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COM MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL I~ OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 80~34
3. Address g. APl Number
P.O. Box 6612, Anchorage, Alaska 99502 50-029~-20513-01
4. Location of Well 9. Unit or Lease Name
Prudhoe Bay Unit
At Surface: 10. Well Number
Y~llR/D#1 (133~.33~11~13). PBU
1433' SNL, 313' WEL, Sec. 33, TllN, R13E, UPM 11. Field and Pool
Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 89.65' AMSLI ADL 28287
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following additional interval was perforated June 6, 1985 using
Schlumberger 2 7/8"' HYperdomes at 4 s.p,f,
A lubricator was installed and tested to 350.0 psi on all well work,
9830'-,9875~' BKB (iRef. B:H~CS/GR, 12/7/80)
..
An SSSV was set and tested in the ball valve nipple at 1995"'
"RECEIVED
JUL 0 9
Alaska 0i~ & Gas Cons. Commission
Anchorage
nreby certify that the foregoing is true and correct the best of my knowledge.
~o
ed~ Acting Di. strict ~7/~~/
Title Petroie,,m Engineer Date
Tl~~e w for Commission use ~ ~/ .
Condi~l~ of Approval, if any: ~~ '~ '~'~
By Order of
Approved by COMMISSIONER the Commission Date ....
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ALASKA OIL AND GAS CONSERVATION CO ISSiON
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1. Drilling well []
Workover operation
2. Name of operator
Sohio Alaska Petroleum Company
3. Address
?.0. Bo× 6612, Anchorage, Alaska 99502
4. Location of Well
at surface
1433' SNL, 313' WEL, Sec.' 33, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 89.65' AMSL ADL 28287
7. Permit No.
80-134
8. APl Number
$0- 029-20513-01
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well No.
Y-II R/D#l(33-33~ll--13~
1 1. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
For the Month of. June ,19 85
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
13. Casing or liner run and quantities of cement, results of pressure tests
14. Coring resume and brief description
15. Logs run and depth where run
1 6. DST data, perforating data, shows of H2S~ miscellaneous data
See Attached.
RECEIVED
J U L 0 9
Alaska 0~i & Gas Cons. CoF, lmissJon
17~,~reby~ ~////~certify that the/X~_~f0reg°~ng is true and correct To the beStActingOf my knowledge.DiStriCt Anch0rage~~
SIG~ED ~ /
.. . ,., TITLE Petroleum Engineer DATE ~p'~ic~te
NOTE--~A~on this form is required ~each calendar month, re~rdless of the status of operations, and must be filed in ~ith the Atas~a
Oil and ~as~onservation Commission by the 15th of the succeeding month, unless o~herwise directed.
Form 10~4 Submit in duplicate
Rev. 7-1-80
PERFORATING DATA - Well Y-11 R/D #1 (33-33-11-13) PBU
June 6, 1985:
Rigged up Schlumberger and perforated the
following additional interval using
2 7/8" Hyperdomes at 4 spf:
9830'-9875' ~KB (Ref. BHCS/GR, (12/7/80)
Put well on production.
June 9, 1985:
Set and tested SSSV in ball valve nipple
at 1995'.
Well on production.
RECEIVED
3 U L 0 9 ~85
A~aska 0[~ & Gas Cons. commission
Anchorage
SOHIO ALASKA PETROLEUM COMPANY
900 EAST BENSON BOULEVARD
ANCHORAGE, ALASKA
TELEPHONE (907) 561-5111
P.O. BOX 6612
ANCHORAGE, ALASKA 99502-0612
April 25, 1985
Alaska Oil and Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Wells A-3, A-8, A-11¢ A-27, B-9~ H-9,
Y-3, Y-5, Y-6, Y-11, Y-18
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on
Wells, for the above-named wells. These contain our proposals to
perforate additional intervals in these wells.
JAB/~']H'~/jmw
Enclosures
Yours very truly,
AJ;t~2gB;;gsgtrict Petroleum Engineer
cc:
A. E. Leske
Well Records (LR2-1)
Drilling Well File 917
RECEIVED
APR 0 1985
Alaska 0il & Gas Cons. Commission
Anchorage
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 80-134
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20513-01
4. Location of Well
OTHER []
At Surface:
1433' SNL, 313' WEL, Sec.
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 89.65' AMSL
33, TllN, R13E, UPM
I 6. Lease Designation and Serial No.
ADL 28287
9. Unit or Lease Name
Prudhoe Bay Unit
12.
10. Well Number
Y-11 R/D #1 (33-33-11-13)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate ~ Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment r-I
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
/
proposed work, for Abandonment see 20 AAC 25.105-170).
The following additional interval will be perforated in May/June, 1985,
A lubricator will be installed and tested to 3500 psi for all well work.
9830' - 9875' BKB (Ref. BHCS/GR, 12-7-80)
An SSSV ~ill be set and tested in the ball valve nipple at 1995'.
Ir~l~/ereby certify that the foregoing is true and correct to the best of my knowledge.
~~ ~~ ' Acting District
~gned Title Petroleum Engineer
,(~3esl~/bel°wf°r iommission use ' ~f
I Cond~ons of ApProval, if any:
Date
Approved-CC~'¥
Returned
By Order of
the Commission
Date ~__--Z:---~' 5
PB'
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
~o: SFO/UNIT/STATE:
SFO
ARCO
CHEVRON
EXXON
GETTY
MOBIL
PHILLIPS
(-Marathon)
· , ': ; C" '->':i,-i-'
ANCHORAGE. ALASKA
TELEPHONE (907! 265-0000
MAIL: POUCH 6-612
ANCHORAGE. ALASKA 99502
BPAE (T~ansmittal Only)
CENTRAL FILES (CC(]':s - TranSmittal Only,),
Date:
cctv:
REFERENCE:
, FINAL .DA~A - PRESSURE SURVEY DATA
The following ~material is being submitted herewith. Please acknowledge receipt bi signing
copy of this letter and returning it to this office: .
k-12/ Pressu,r,e Survey" :& BH,P,D 7/25/82 Dres.
A-10~ ~ ~i~' 7/31/82 GO "
A-11/ - "'~` "' 7/24/82 GO
A-16 -' " " 7/24/82 GO
A-17 / " " 7/28/82 GO
B-16 '" " " 7/27/82 GO
H-8." " " 8/4/82 GO'
J-10j " " 8/13/82 GO
Y-6 '/ " " 8/11/82 GO
N-15 f'' Pressure Survey 8/10/82 GO
R-3z' " 8/6/82 Sch
E-7' Pressure Survey, & BHPD 7/23/82 Sch
M-15~ Pressure Survey & BHPD 8/13/82 Camco
A-18 z'~ " " 8/14/82 Camco
M-16 ~'''' " " 8/15/82 Camco
R-7×' " " 8/7/82 Camco
R-8 / " " 8/11/82 Camco
Y-il/' " .... : " 7/27/82 Camco
2)
RECEIVED
.DATE
,,'?,, ' D cF. "-~
l~r).cj'~O: ~.~ Development Geology
~9 Well Records
SOHIO ALASKA PETRE;LE
TELEPHONE (907) 276-5111
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
3111 "C" STREET 'i
ANCHORAGE, ALASKA ~
August 17, 1982 ~
Alaska Oil & Gas Oonservation C~ssion
3001 Porcupine [~ive
Anchorage, Alaska 99501
.
Attention: Mr. C. V. Chatterton
Wells A-15,N-15,R-8,R-10,,~;ll R/D ~1 PBU
Encl0. sed, in duplicate, 'are the fOllowing forms for' the above-
1. Form 10-407, Ccmpletion Report;
2. Form 10-403, Sundry Notice and Reports on Wells;
3. Form 10-404, Monthly Report of Drilling and Workovers.
L I~)~ s2~::~~;ld '"'i?'ngineer
Enclosures
Geology
Well' :File #17
' ~ ~ STATE OF ALASKA ~i
'~ ALASKA ,. AND GAS CONSERVATION C° ,~¢ISSION
WELL cOMpLETION OR RECOMPLETION REPORT AND L
1. Status of Well Classification of Service Well
OIL k--I GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Sohio Alaska Petroleum Company 80-134 ~,
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20513-01 !
4. Location of well at surface 9. Unit or Lease Name
1433' SNL, 313' WEL, Sec. 33, TllN, R13E, UPM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
1817' NSL, 2485' WEL, ~ec. 33. TIlN, R13E, UPM Y-11 R/D#i (33-33-11-13)
At Total Depth ~3~ 11. Field and Pool
1819' NSL, 2607' EWL, Sec. ~ TllN, R13E, UPM Prudhoe Bay
.5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 89.65' AMSL ADL 28287
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions
10/24/80 12/7/80 12/7/80I feet MSLI one
17. Total Depth (MD+TVD) 18.Plug Back Depth(MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost
10495'MD 9668'TVD 10425'MD 9600'TVD YES~ .NO[]I 1995 feetMD 2035'
22. Type Electric or Other Logs Run
DIL/SP/GR, DIL/SP/BHCS/GR, FDC/CNL/GR/Cal, CBL/VDL/CCL/GR
23. CASING, LINER AND CEMENTING RECORD '
, ,.
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulated ~onductoz surface ...... 110' 36" 8 cu.vds, concrete.
13 ".3/8" 729 L-80 Surface 2662' 17 1/2" 4301 cu.ft. Permafrost
: _
9 5/8" 47# L-80 Surface 9530.'.. 12 1/4" i'320 .cu.ft. Clas.~ C.:
7" 299 L-80 9033' 10472' 8 1/2" 462 cu.ft. Class G ~/18% salt
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
,
interval, size and.number) MD TV~sS SI~E' " DEPTH SET (MD) PACKER SET (MD)
Prudhoe Oil Pool top: 9760' 8865' 5 1/2" 9079'
]~ottom : 9830' 893.3'
,
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. -
' TVDss) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9760' .... 9.768~! BKB (18865.' .- 8873'~, . .: ~ ~:-..~
9~776': - 9790' ~K~ ('8881,''- 8894' TVDss) 9810-9660'' ' ]~20 cu.ft. Cla~s
9_797" - 9806' ~KB (~8901' - 8910' TVDss) 5300-5500'" 164 cur ft.
9'814' -. 9'830''. BKB (89'17'. -. 8933' TVDss) . pl~ ha~]~ ~ ~h~n~nn t.~ll V--ll (lZ~-11--11--11%'
,, .
- : .~. ,: . . .-., .; ; ,- , ·
27. PRODUCTION TEST
......
Date.Eirst.,Production . ·Method of Operation (Flowing, gas lift, etc.)
July 20, 1982 I F1 wi g
Date of Test Hours Tested PRODUCTION FOR Gl L-BBL GAS-MCF
WATE'R'~B B I' CHOKESIZE GAS-OiL RATi'O
· . TEST PERIOD.]]~
FIov~ T-ubing Casing Pressure . CALCULATED OI L-BBL GAS!MC~ WAT'EI~-BBL O'lL GR VITY ~,PI (corr)
Press .... 24-HOUR RATE.]]~ ' ":' ' ' ' ': ~ ~ .
28. CORE DATA
'Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit co~'e chips.
,st
Form 10'407 .....
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
Submit in duplicate
29. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
BKB Subsea
Sag River SST. 9668 ' 8776'
Shublik 9684 ' 8792 '
Ivishak 9757 ' 8862 '
·
.,
31. LIST OF ATIACF/I~ENIS
Signed /'/~~'--.~J ~'~f,~ T~tleDistrict Field Date ~'///7/~~
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal~..water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used~as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24:,-,:!f this well is completed.:..for separate production from mo~ than one interval (multiple
~,ompletion), so state in item 16, and in ite~ 24 show the producing intervals for only the interval repor~'~d
in item 27. Submit a separate form for each additional interval to be separately produced, showing th.e
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain°
Item 28: If no cores taken, indicate "none".
Form 10-407
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL []
2. Name of Operator 7. Permit No.
Sohio Alaska Petroleum Company 80-134
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 .- 504929-20513-01
4. Location of Wel~t Surface:
OTHER []
1433' SNL, 313' WEL, Sec. 33, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 86.95' AMSL
6. Lease Designation and Serial No.
ADL 28287
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
Y-11 R/D#i (33-33-11-13)
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF'
(Submit in Triplicate)
Perforate [] Alter Casing [] Perforations
Stimulate [] Abandon [] Stimulation
Repair Well [] Change Plans [] Repairs Made
Pull Tubing [] Other [] Pulling Tubing
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
(Submit in Duplicate)
~ Altering Casing []
[] Abandonment []
[] Other []
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals' were perforated July 20, 1982, using Gearhart 3 1/8" carrier
guns at 4 spf. A l~bri'c'ator was installed and tested to 3500 psi on all Well work.
9760' - ~768' BKB (iRef. BHCS/GR, 12,7/80)
9776' - 9790' BKB' (i "" )
9797"- 9-806' BKB (i "~' )
9814' ~- 9830' BKB (i. " )
The well was. incapabt'e of flowing, curr'ently shut-in.i;
14.1 her~~::~~ is true and correct to the best of my k~owledge.
Signed ~ ~ ~~ Title~~C~ ~ ~~
The spac~eloTM for~mission use g 'L:
Conditions of Approval, if any:
Approved by
By Order of
COMMISSIONER the Commission Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
-!' " STATE OF ALASKA
' ' ALASKA (_AND GAS CONSERVATION C<~ ,vllSSION ~ (~
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS. ??<
1. Drilling well [~ Workover operation []
2. Name of operator 7. Permit No.
Sohio Alaska Petroleum Company 80-134
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50Q29-20513-01
4. Location of Well 9. Unit or Lease Name
at surface Prudhoe Bay Unit
10. Wel,.No.p.~ ..~ 1
1433' SNL, 313' WEL, Sec. 33, TllN, R13E, UPM Y-11 (33-33-11-13)
11. Field and Pool
Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe' Oil Pool
K~E = 86.95' AM.qT,I ADT, 2R2R7
For the Month of July ,19 82
,.
'12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
13. Casing or liner run and quantities of cement, results of pressur9 tests
14. Coring resume and brief description
15. Logs run and depth where run
/
,~1 6. DST data, perforating data, shows of H2S, miscellaneous data ·
See ~.ttachment
17. I here~fy~/: t./~"~E'~oing~ is true and correct to the best of my knowledge.
;SIGNED(/~_.. . -__% ~-~ 4~x~_ TiTLE~District Field Engineer DATE
NOTE--Report on form is requi._d for each calendar month, regardless of the status of operations, and must be filed du~_.iCate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 Submit in duplicate
Rev. 7-1-80
·
PERFORATING DATA - Well Y-11 R/D 91 (33-33-11-13)
July 18, 1982:
July 20~ 1982:
July 24, 1982:
JUly 27, 1982:
July 27, 1982:
Pressure tested tubing and inner annulus.
Rigged up Gearhart and perforated the following
9760' - 9768' BKB (Ref. BHCS/GR, 12/7/80)
9776' - 9790' BKB (
9797' - 9806' BKB (
9814' - 9830' BKB (
Well put on production.
,, )
" )
" )
Shut well in to prepare for static pressuresurvey-
Ran static pressure/temperature survey at 8800' TVDss.
Well is currently shut-in after it was discovered to be
incapable of flowing.
.,/
31 ~ ' t.' ' STRE[:T
ANCHOF'AGE AL.-'- ;.Y A
TELEPHC."JE (90?) 27(3-5111
MAIL POUCH 6-612
ANCHORAGE. ALASKA 99,502
January 14, 1982
Alaska 0il & Gas Conservation CommisSion
3001 PorcuPine Drive
Anchorage, Alaska 99501
Attn: Mr. C. V. Chatterton
Gentlemen:
Wells A-10, H-15, M-9, M-11,'~'N-12, R-7,~Y-i] h~J~/~'/
Enclosed,-'in triplicate, are FOrms 10-403, Sundry Notices and
Repor~,~ on WellS, for .the above-named.wells. These r~ports
contain our proposals to perforce the wells.
District Field Engineer
GJP:JLH: ja
Enclosures
CC:
Well~ File #17
F,E. File
J. D. Hartz
Geology
SUNDRY HOTICES AND REPORTS'ON WELLS
1. DRILLING WELL [] COMPLETED WELL [] OTHER []
2. Name of Operator 7. Permit No.
Sohio Alaska ?etroleum Company' 80-134 :..
3. Address ' · 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 . 50-029-20513-01
4. Location of Well 9. Unit or Lease Name
At surface: Prudhoe Bay Unit
~o. We,,
1433' SNL, 313' WEL,.Sec. 33, TllN, R13E, UPM Y-11~-33-11-1~)
11. Field and Pool '
, Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 86.95AMSL '1 ADL 28287
·
.
12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF':
(Submit in Triplicate) · (Submit in Duplicate)
Perforate [] Alter Casing Fl ~ Perforati~3ns [] Altering Casing Fl
Stimulate FI . Abandon rq' Stimulation [] Abandonment []
Repair Well [] Change Plans ' [] · Repairs Made [] Other []
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for e~ch completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent 'dates, including estimated date of starting any.
·
proposed work, for Abandonment see 20 AAC 25.105-170).
The following intervals will be perforated during February/March 1982, using
GO Int'l. 3 3/8" True-Jet guns at 4 spf:
9760' - 9768' BKB (Ref. BHCS/GR, 12/7/80)
9776' ·- 9790' BKB ( " )
' 9797' - 9806' BKB ( " )
9814' - 9830' BKB ( · " )
~ $$SV ~i[1 be see and reseed in the ba[1 va[ye n~pp[e ca. 21300'.
,,c'o ~,.,~ss,.~,~.~,7- .' -~'~ "" .Z.~'~ :""
~l,,.~%~¥t/ ' " ' ' '. '"' ~'- . ' '. JAN
· ,,:,~>/;~(t?/ · i ~se'~e~t Wo~ ~ort¢ct .~'_ ~ ~ .... '- 0" & Gas Cons commission. '
~d' ~/ /.. ~.. ~' ~' r nd rte t ' h b ,cfm knowle '
Si,ned /~(~j~ .~.~~' X~ ~_~/~.~,... Title District Field Engineer' . Date. ,~/,/,,.%'"'1.~
The spac~below for C~mission use G~J J. Plisga
, ,.
Conditions of Approval, if any: Approved
Returned
6RIGI.IlAL SIGNED ///~
BY LONNiE C. 'SMlT,it ' ' '-
By'Order of '
Approved by.. COMMISSIONER the Commission Date ......... ~_- ......
·
Form 10-403 Submit "Intentions" in Triplicate
R~, 7-1-Riq and ".quhsenuent
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO'BP ALASKA PRODUCTION DIVISION
· o: STATE OF ALASKA
"R~.S tNG
3111 "C" S
ANCHORAGE
TELEPHONE (9~
MAI L: POUC
ANCHORAGE, AL
REFERENCE:
.~ F-2 Gyroscopic Survey
../""~~~Magnetic Sing le Shot Surv ey
/~fiO Y-11 Magnetic Single .Shot Survey
DIRECTIONAL SURVEY DATA
~T_he following material is being submitted herewith. Please acknowledge receipt by signing
copy of this letter and returning it to this office:-
l/lO/Si
11/10-12/7/80
10/24-11/9/80
Carol Krieter
Well Records
RECEIVED ,. ,
E)ATE
SOHIO ALASKA PETROLEUM COMPANY
January 15, 1981
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-00(
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99
Alaska Oil & Gas Conservation ~ission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Y-11, Redrill 91 (33-33-11-13)
Enclosed, in duplicate, is Form 10-407, Completion Report, for
the above-named well together with the Well History, Well Logs,
and Directional Surveys.
This well has been suspended pending perforating operations.
RHR: ja
Enclosures
cc: Well File ~17
Yours very truly,
R. H. Reiley
District Drilling Engineer
JAI? 1 9
. ~ ~.~, Commissio~
~nchorage
( WELL Y-11 R/D #1 (33-33-11-13~
WELL HISTORY
Spudded well at 0001 hours, October 24, 1980. Drilled 17 1/2" hole to 2677'.
Ran 68 jts. 13 3/8" 72# L-80 Buttress casing to 2662'. Cemented with 4301
cu. ft. Permafrost II cement. Installed and tested BOPE. Cleaned out to
2624', tested casing to 3000 psi, okay. Drilled out to 2691', ran leak-off
test to 0.62 psi/ft, gradient. Directionally drilled 12 1/4" hole to 9819'.
Well Y-11 (34-33-11-13) was abandoned (see Form 10-403, Sundry Notices and
Reports on Wells, dated 11/24/80) and was redrilled as Y-11 R/D 91 (33-33-11-13).
Y-11 was plugged back by laying a 150' (120 cu. ft.) Class G cement plug from
9810' to 9660'. A second plug was set from 5300' to 5500' BKB consisting of
164 cu. ft. Class G. Well Y-11 R/D 91 kicked off from 5350'. Directionally
drilled 12 1/4" hole to 9540' Ran 250 jts. 9 5/8" 47# L-80 Buttress casing
to 9530'. Cemented in two stgges: First stage with 1320 cu. ft. Class G
cement; second stage through D.V. packer at 2581' with 130 cu. ft. Permafrost. C
preceded by Arctic Pack. Cleaned out to 9487', tested casing to 3000 psi, okay.
Directionally drilled 8 1/2" hole to 10495'. Ran open hole logs. Ran 36 jts.
7" 299 L-80 Buttress casing to 10472'. Cemented with 462 cu.ft. Class G cement.
Cleaned out to 10432', tested casing to 3000 psi, okay. Changed well over to
NaCl, ran CBL. Ran 225 jts. 5 1/2" IJ4S tubing to 9079'. Landed tubing with
ball valve at 1995'. Installed and tested tree. Displaced tubing to diesel,
set packer at 8953'. Tested tubing to 3500 psi, okay. Released rig at 0730
hours, December 17, 1980.
' K/'' STATE OF ALASKA /''
ALASAI,._,L AND GAS CONSERVATION C~... ,MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
-1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Sohio Alaska Petroleum ~y 80-134
3. Address 8.. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20513-01
4. Location of well at surface 9. Unit or Lease Name
1433' SNL, 313' WEL, Sec. 33, TllN, R13E, UPM Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
1817' NSL, 2485' WEL, Sec. 33, TllN, R13E, UPM Y-11 R,/D~]
At Total Depth 11. Field and Pool
1819' NSL, 2607' EWL, Sec. 33, TllN, R13E, UPM Prudhoe Bay
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool
KBE = 86.95 ' AMSLI ADL 28287
12. Date Spudded 13. Date T.D. Reached 14. Date ConApw,~. or Aband.,~n~ 15. Water Depth,
I
if
offshore
16.
No.
of
Completions
10/24/80 12/7/80 ,//"'12/7/.~ ~ ~¢ - t "I ',,~~ feet MSL I one
17'.Total Depth (MD+TVS) 18. PlugBackSepth(MD+TVS) 19.$'~~urvey I 2~.SepthwhereSSSVset I 21. Thickness of Permafrost
10495'1vD 9668'~gD L0425'MD 9600'~AID YESE~ NO[] I 1995 feetM, D I 2035' .,
22. Type Electric or Other Logs Run
DIL/SP/GR, DIL/SP/BHCS/GR, FDC/CNL/GR/Cal, CBL/VDL/CCL/GR
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20"x30" Insulate] Conducb3r Surf. 110' 36" 8 cu.yds, concrete
13. 3/8" 729 L-80 Surface 2662' 17 1/2" 4301 cu. ft. Permafrost II
·
9 5/8" 47~ L-80 , Surface '~" 9530' 12 1/4" 1.320 cu.ft. Class G; i30cu, ft. Permafr(
7" 299 L-80 9033' 10472' 8 1/2" 462 cu.ft. Class G ~/18% salt
24. Perforations open'to Production (MD+TVS.of Top and Bottom and 25. TUBING RECORD
" i'nte~val, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
5 1/2" 9079' 8953'
None . : ,,~ : ',
O 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
. . ,. ,' ~ , DEPTH INTERVAL (MD) .AMOUNT.& KIND OF MATERIAL USED.
9810-9660"' 120 cu. ft. Class G w/18%' sa1,
· .
5300-5500' 164 cu.ft. Class G w/18%
· :' ' ........ : ., pl~g h~nk_ ,¢,,_ ~h~n: ...... Inn w~l I ¥-1 1 Iq~-q~-l,_ _ 1-1 q'~,
·
27. PRODUCTION TEST
Date First PrbduCt[on ' ' ~ Method of Operation (Flowing, gas lift/etc.) , . .. · .
·
Date of Test Hours Tested PRODUCTION FOR Gl L-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
- . :~ · TEST PERIOD I1~ .' . ..:~:,.
Flov~ Tubbing~ · Casing'Pressure .CA'LCU'LATED .~ .OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
.Press. . ..... . . 24.RODR RATE'-r~ :.
28. COP E DATA ,
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
None
... . . . Alaska Oil &;.~s,_Cons. u"ornrnissior,
.,. ar~cr~ora.qe,__ -..
r
·
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE /i ~:
29.
GEOLOGIC MARKERS
NAME
MEAS. DEPTH TRUE VERT. DEPTH
Sag River SST.
Shubl ik
Ivishak
S~a
9668'
9684 '
9757 '
31. LIsT OF ATTACHMENTS
8776 '
8792'
8862 '
Include interval tested, pressure data, all fluids recovered and gravity,
GOR, and time of each phase.
· Well History, Well Logs, Directional Surveys
32.
I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~[ __~~_ ._~~~ Title District Drilling Date
Enqlneer
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of .Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion'.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth m'i~asurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If~.:this well is completed for separate'production from more than one interval (multiple
completion),' so sta~:~" in item 16, and. in item 24 show the producing intervals for~;~:only the intervahreported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (G L) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage 'dement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
I:nrm I
Sperry-Sun, Inc.
P. O. Box 6207
150 W. Dowling
Anchorage, AK 9950~
,.
December 29, 1980
Mr. Gary Plisga
Sohio Alaska Petroleum Company
3111C. Street
Anchorage, Alaska 99503
Re: Our Boss Gyroscopic Survey
Job No. Boss-16720 ~/
Well Y-Il (SEC33 TllN R13E) jOfl~'¢/
Prudhoe Bay Field
North Slope, Alaska
Date of Survey: December 23, 1980
Operator: Kirk Afflerbach
Dear Mr. Pllsga:
Please find enclosed the "Original" and seventeen ~(17) copies
of our Boss Gyroscopic Multishot Directional Survey on the above
well.
Thank you for giving us this opportunity to be of service.
KB/kc
Enclosures
Yours very truly,
SPERRY-SUN, INC.
/0. -o.,,,,
Ken Broussard
District Manager
t~E/~SUPED VERTt-C~,L - VERT
DEPTH DEPTH DEP
lO0 IO0.O0 1
200 199.99 11
300 .................. 2,9.9.98 ..... 21
400 399,98 31
500 ~99,98 ~1
~-,.0-0 ..................... 5-g.9-., -9.7 ............. : .... 5.1
700 699, '~7 61
.......... ~ ..................................................... SP,E,~R--Y.--SUN -WEL"""~'~URVEYING-.-COMP-ANY ' ~ ...... PJ~GE- ....~-
AN CHOR~,E ~ ALASKA
~[FIO ALASKA PETROLELH COMPANY ., gATE OF SURVEY DEC, 23, 19~0
-Y-Il ..... (SEC33,~T.-1.t.N-.Rt3E~ ............................... CO~PUIATIGN ,D~TE ............................... BOSS .... GYROSCOPIC--SURVE;.Y ' - ....
P~U[:I~OE B~Y ~ /~~/ DECEMBER 29~ 19~0 . OOB NUMBER BOSS-16720 ~ ..... ~~
~LASKA KELLY BUSHING ELEV. = ~6.95 FT.~
OPERA T. OR- A F.F~.E-RB A G H ~--~
.
TRUE' S~B-SE~ COURSE COIJRSE DOG-LEG TOTAL
1CAL ' ':INCLJNAT]~N'-: ..... DIRECT. I-ON': ...... SEVERITY AECTANGUEAR ..... COOR-D[.NATE. S ......... VERTICAL
TH BEG MIN DEGREES DEG/~OU NORTH/SOUTH EAST/~EST SECTION
0 ~i S 77. ¢~ W · .G9 9.86 N ,59 W -5..~
:
6. ",45
3.0--'5
3.0~
3.03
3
3.02
C
0
2,99
2,,98
2,92 ...............
2,98
~.q8
aO0 799,q6 713.01
................... ~-9 O g .............. ::89.9,.-9,6 ..... i ...... i .., 815 · 0 l
1000 q99.96 913,91
110'0 1099.96 1013, O]
.......... ~.~oo .............. 1 ~,.~..~ ..........
]~00 1399.96
le, O0 1599.95 15~3.06
170C 169q.q5 1613,
]900 ~899.95 18~3.
2~00 1999.94 1912.99
21 O0 ........... 2.099- 9.~,.~.:
2200 2199.9~ 211
2500 2299.93 221
................. 2 ~ 60 .............. 23-99- 93 .............. 231
2500 2~99,93 2~1
2600 259~,93 251
2~00 ,=79q.c~ 271
............... 3'~ 0'0 .... ......... 299'8" 7 8 ......... 2
"
0 3
.0 ..... 3
0 2
0 2
0 3
rl 2
6 S 65,50 14 .15 9.51 N 1.66 W -~.
~ .... S ·75.89 i4 ........... .11 ......... 9..1.~ .N ................... 2..$;~.-W ........... -£---3.9~-
7 S 6g. 0 W .~ 8.89 N 3.50 W -3.1~
7 S 71.~9 W ,03 ~.62 N ~.25 W -2.3q
~! .............. &.75.8%-W .................. · 19 .................. ~.3 5--N ............... 5.1-8 ....W ................t-.51-
8 S 71,79 W .18 8,09 N 6,12 W -,63
2'-9R ..........D
2.95 2
2.6~ 6
1.g3 ......... 'r~
f~ 21 S 60o 0
0 2q N 71.70
0 13 N 80,10
O. - 1'.8 ........... g-..65-,,6 O.
.2,.2 S 7~'60
1 A
18 S 67.39
lA S 68.29
, 20 ................. S .... 79,50
30 ~'82.
3 5 S 87, IQ
O 26 ,S
0 22 S 86.39
O lq N 87.50
0 7 'S 35-69
q 3 S 89,39
9 S 25.2~
3 S 0,50
..... 53 ........ S'
W .15 7.81 N 6.78 W .05
W .19 7.75 N 7.85 W ,91
W .19 7,88 N 8.39 W 1,23
~ .09 7,61 N q,37 ~ 2.15
W .11 7.~9 N 9.92 W 2.6~
~ .... , O 7 ...... :- .............. 7 , ~.7...N .............. 1 G., ~ 1--.~ ~, O 9
~ .02 7.~B N ~0.90 ~ 3..59
· O0 6.98 N 11.39 W
.07 ...................... 6,8-;~. N
· 17 6,72 N 12,66 W 5,Z2
· 06 6,63 N 1.3,58 W 5,92
· 22 ..................... G .,~9...N'.~ ............... &.~.~ 9._.W 6,7~.._
· 22 6.16 N ~5.0~ W 7.39
· 13 6.15 N 15.57 ~' 7.80
.2~ 5.~6 N ~5.99 ~ 8.25
· 17 5.86 N 15~97 W
W ....................... ,'I ~ ..................... T 5';; 8'0 ..... N
W 2.02 4.03 N
W ~+.19 2.95 S
W ................... 3,63 ..................... 15'5'7-'S
17.1~ P ' 10.37
17.99 W 15.56
2 U -,-~'5-W 25,66
ANCHORAGE~ ALASKA
ALASKA PETROLEUN. COMPANY DATE OF SURVEY DEC. 23~ 19g0
Y-l] (SE:C3~, Yi'I'N~ Ri 3E ) ...................................................... CO'gPUTAT ION"DATE .................................. B 0 S S -'G'YR CSCO PI"C--SOR V~Y
PPUDHOE R~Y DECEMBER 29~ 1980 OOP NUMBER BOSS-16720
ALASKA KELLY BUSHING ELEV, = 86,95 FT.
.
TRUE .,, COURSE CCURSE TOTAL
SUB-SEA
DOG-LEG
ME A'SURED ................. VER T I'~-AL' ......... VERT I'~ AL ....... ~N CL INA T I ON .... DI REC T ~'ON SEV ER'ITY ...... R"ECTAN GU L AR CO OR'D'~ NA"T'[S ...... VER T i' CAL
~EPT~ DEPTH DEPTH DEG MIN DEGREES DEG/iO0 NORTH/SOUTH EAST/WEST SECTION
i 3300 3290,P9 3203°94 16 6
.... 340'0' 33R6~31 .......... "~:' .......
......... 32 ~9.36 18 38
350~ 3~80.52 3393.57 20 30
3600 3573.28 3qBG.33 23 20
'- ...................... ~.7 O'O ...... 3 ~'~-4~-'i ? ............... 357'7'22 ..... ~' 55
~ 3~0C 3753.05
~3900 3839.20 3752.25 ~2 23
I
.................... 4~6(~
4100
z~3'O 0 ......
53.8
S 26,1.0 W : 2,09 77.3
S"' 26,29 "W ......... 2,53 ............. 1'04'1
S 27, 0 W 1.87 134,0
S 29,19 W 2.96 166.9
........... '.q'; 3 0 · - 0-' W .................... 2 ;'&"O .................. 2'0 3 .'2
S 31. O W 2.74 242,6
S 32.G9 W 3.87 285.7
"'3922-.97 ............... 3'B36';'02 .... 33 47 .... S 32,89 W ........... 1,40 ........... 3'31'.'A
4005.99 391~.0~ 33 5~ S 32.60 u .25 37~.5
49~8.97 fl002.02 33 52 S 33. O W .2~ 425.~
A400 q25qo76 A167.81 34
! 4c0C 4-337.33 q'~=
~o0,3~
................ ~"g 0'0 .......... 4A lg · ~9 .............. ~ 3'3~'; ~'4 ................ 34 .... 47 ....
~700 ~50~ .AO ~I~.~5 ~5 25
~HO0 ~5~2.93 ~95.98 ~5 20
i ................ ~ gOO .............. ~G'~ 4,'39 ............ '~57 7~"t~ ....... 35 3 3 .......
~7~5.~ ~G58.89 35 22
~827.55 ~40.~0 35 2
~9'0'9'. g~ ......... ~'8'22;~7 .................. ~4 3~
~92.00 ~905.05 3~ 25
507~.55 ~987.G0 3~
...... 5~57'3~ ...... 5970.36 ......... ~ ' ' ] '
52q0.31 5153.36 33
5323,7G 523G.gl 33
5'3~5,93 ............... 5278.98
540R,29 5321.'3~
5~56.~0 5363.~5 33 1
.... 5q 92';R5 ........ 5'q 05,30 33" I9 .......
3'2'.R 2-' S
0 S 36.,42 W
6 S ~+7,51 W
4 "S ............... 6-0'"69-"W
7 S 75,72 W
7 S 93.34 W
0" ~ ......... '1-f3' ',"9
G S 137.26 W
5 S lG4.,O2 W
4"'S ............ 1 9'3 ','5 9-'~
2 S 223.75 ~
3 S 253.98 W
9' ~' '2'-~
518.57 S 315,93 W
565°03 S 3A7,92 W
113'90
144.81
179.61
2'i8';8A' '
2~2.21
310.63
~16.39
tt6 9. p,q
577.57
652.1~
5100
52C0"
~'500
5600
............ 5750
5800
5A5 0
i .............. SgO0'
l
35 · 69'"W .......................... ,59 ............. 611'. 47' S 3 ~'O'";'7q:--W .......... ~ ~.7'; 2 7
36.19 W .68 658.02 S 414.50 W 743.22
36.79 W .36 '1CA.57 S 448.94 W 7q9~ _
· .3g",'69'~-~ .................... .23 ............... 751 . 04--~ 4- ~'3-~'g-4--~J 856 ,.
37, 0 ~ ,26 75'7.~7 S 518.4~ W 912,93
37.19 W ,35 ~A3.~5 ,., e,. 5'53.21 W 969.27
39.60 W .21 931.89 S 62~.R2 W 1081.22
39,19 W .27 975,50 S 660,64 W 1136.81
39.29 W ..... .27 .... lOla.9'T"~ff ............... '6'9"6'.1-6 W .............. 1'1~2.3a-
38.89 W .32 1062.26 S 731.3tW 12t6.97
~3.19 ~ 2.~ 11~3.79 S 767.~8 U 1301.~5
AS.G~"W ' " 6.'31 " 'i122.A8' S ........... 7~6'.77-"~ ............. I328.2G
53.69 W 5.3~ 1139.11 S 807.~6 ~ 135~.75
5~.50 Y 1.80 115A.91 S 829.30 W 1381.65
5~.79 W ......... ' ...... ,70 .........117~-,7~ ....S ......... 8'51-;6I W ........1~08.g9
', .
oURVEYING--COMP'A-NY GE ....3'
"':'' ' ANCHORAGE~ ALASKA
SOHTO A~ASKA PETROLEL~ COMPANY . ~ . , bATE OF SURVEY DEC, 23~ 1980
Y;I] .... (S'~C3~",'TI~M'~'R'13E') ..................................... ~"'"":'"--J"~; ..... CO~4DUTAT':IOE DATE ........................................ BOSS-"GYR"GSCOP'I C""SURVE'F ......................
PRUDHOE BAY DECEMBER 29, 1980 dOB NUMBER BOSS-16720 .
ALASKA KELLY BUSHING ELEV. = 86.95 FT.
, ~
TRuE SU -SE.A COURSE COURSE DOG-L G TGTAL
P~ A'~ UR ED .... V'ER Y I C AL .... VER T ~'~ A L .......iN'CE ~Ft~A T"i CN ~ ' D I ~E C TIGN ........ 'SE:V EF'R"~-TY .......... F: E'C T'AN GU L'AR ...... CO'O~'D'~NA'T'~ .... VE'R'T' ~ CAL
DEPTH DEPTH DEPTH DEG M~N DEGREES DEG/~DO NOKTN/SOUTH EAST/WEST SECTION
~'DO 0 .............. 55'75',"zi'1'-~"qa8 "4'~'": ....... -' ..... ,54' '9 ........... S'":54 · .. O W. : . 8A ~2 D2'~8'8-'S ......
(,lOC 5657,97: 5.571,02 ~ 32 . ~ 5~,29 W ,42 12~
..... c5.72 S 9A2.79
~200 5740,03: 5653,08 ~5 9 S 5~,10 W · .62 1269,15 S 989,1A
............................ 636'6 .......... 5 H'Z i","4" 6''''~ ..... ~:"5734'"'~'5 ................ 35 .....54' ......... '" S ..... 5:~',' I'D'"W ........................... .'75 .......... i3 O 3 · 2'3" S ..... ~ U 56%'2 2
~400 5902,32 5815,37 36 2 S 54,10 W ,14 1337,68 S 10~3,81
6500 5983,13 5896,18 36 8 S 53,29 W .~ 1372,56 S 1131,29
152[ ~3
1577,3~+
I-6',~ 5 · 26-
16 .93,81
1752,55
7100 6474,57 6LSR7.6
....................... 7'20"0 ................. 65 5"~; '85 ............ '":6 97'I' · 9
7 oo G64 .75 556.
i 7400 6729,2A 6642,2
~ ...... 75'0'0 ............. ~ 1'5"34 ............... 6728.3
7~00 6~02,1~ 6a15,2
ggO0 .............. gD '63-';-97"~T" '~977 ;'OP .............. 35~''-'5' 8"-~-'"~'52";79-~Y ................. ,33 ....... :'f'407 .~ -4-"g---~I I7 ~-~ 3 .... w ........ 1"~'1" I-;- 29'-'
6700 6145,07 ' 605~,12 35 57 :':S; 52'19 W .50 14A3,55 S 1224.74 Y 1869,70
&80C 6226,62 : 61~9,67 ~5 5 .~: S 51,50 W ,67 i479,30 S 1270,26 W 1927,52
'~,"9' 00 .............. G 3'~'8";'50'''~ ...... ~""~'~2'21.55 ............... 34 ......... 5'T~ .....~"'"~'""5'I','I'~""-W': ........ L ........... .'22 .......... 1' 515'J15 .... S ......... I'3'I~;B'~ .............. I-g'R"4". 'H FF
7000 6391,02 6304,07 ~3 48 S 51,10 W 1,15 1550,58 S 1359,07 W 2DA1,33
2 ~2 51 S 51,19 W ,95 1585,05 S 1~01,86 ~ 2096,25
C S1 32 S '59,60 W ,71 . 1652,38 S 1~84,57 W 2202.~7
9 30 57 S 50,i~' W ,64 1685,48 S 1524,52 W 225~.7~
9 ' 30 .....9 ............. S'"'49,8~' "~ ............ ,8i ............. 17I~'. 1 7"-S ........... 15'6'3'"'47-W 2305'. 5~-'
4 2~ ~G S 50.29 W .9~ ~749~96 S ~60~.50 Y 2355.~
7700 6990.16 6903,21 27 32 S 56.79 W
7f~ 00 ................... 7 D-Tg",-4"0''- ~:':'''':'' "G-g'92'" 4 5 ........ 2'G ....... G:'T"~' ~' ':'S :;."6 ~" 19'
I
! 7900 7170,12 7085,1'7 23 36 S' 60.69 W 2,
l PO00 7262'36 71.75,A1 2.'1 A. 8 , S 60,79 W 1,
I ........................... ~']00- ............ 7'355";"~2 ............. 7'268.87 ........ I'9 ........ 4"8 ~ ..... ;"S .... ~1"1'0
F200 Y450.27 7363,32 18 31 S 60.79 W i,
P3OO 75't. 5.fl3 745,u,.~P., 1.7 15 S 66.79 W 1.
54 1778.25 S 1639.67
11"':¥ ...... 718'0I"8'4'- S .............16' 78-,'1' 1--W ...... 2 '~ ~ ',. 06-
51 1822,57 S 1714,65 W 2488.29
79 18A1,43 S.. 1748,32 W :2526,12
29 i879.62 S 1808.07 W 2593.07
26 1889.61 S 1834.~9 w 2623,17
76'4I ';'l"O ...... FT ...... :"7554, 15 ........... ti 6'"','-'T3:~T-':"":- ?'$~'-61,29 'W ............. : ..... ;'71 ............. 19 ~ 3 '69 S ............ 18 G 0'.'3 ~"" W ............ ZE51'-' G 6"'
7757,00 :' 76~0,05 16 S 61,79 W ,27 1~17,19 S 1885,25 W 2679,3A
7'832,96 7746,01 :16 21 S 63,39 W ,45 1~0,14 S 1910,23.W 2706.73
........... 7~'2'8",'9'5'''~''': ..... 7-8 42- o o .......... ~'--.~¢,~-~--.-'~.s,- .-~---~-~s ...... 65 ;'~ o' 'w ............. ........ "q ~ ............ I~", 2';'~-'2'"-s ...... I9'55-; ~"~'- ~--27 33-;a~-
8025,~2 7938.07 16 0 S 66,19 W ,35 1953,79 S 1960,76 W - 2760,~7
8121.20 8034.25 15 45 S 66,39 W .27 196~,81 S 1985,81 W 2786,65
'92"I7;-~ ...... '-~'"' B 13 O';"6 O ............. ~ ...... :I~5~:~':"2 U~' ........ S,- 6'8 , 79'-' W '"'~:", .............. ~76 ...... ",' 1' ~75'. 02 S .......... 20'1'U';'5'8-~ ~ 2 "~ F-'
.
ANCHORAGE,, ALASKA
SCHIr, ALA-'qKA PETROLELM CO,,~P~INY
Y 11 (SEC33,,TllN,Rl'3E} ...........
PRUDHOE BAY
ALAgKA
TRUE SUB-SEA
MEASURED ........... VERTICAL .... VERTICAL
DEPTH DEPTH DEPTH
COMPUTATION GATE
DECEMBER 29,, 1980
DATE OF SURVEY DEC. 23,, 19/t0
BOSS'"GYROSCOPIC SURVEY
,JOB NUMBER BOSS-16720
KELLY BUSHING ELEV. = 8G.95 FT,
iD P E R A T 0 R-; A'F F L-ERB A~CH ....
COURSL COURSE
INC L INATICN ......... DIRE CTI GN
DEG MIN DEGREES
DOG-LEG
SEVERITY
DEG/lOO
TOTAL
REC-TANGULAF-' CO'ORDrlqATE'S .......... VERT ICA. L
NORTH/SOUTH EAST/WEST SECTION
.............................. ~I-UO ......... '8'3'l-'fi-;'O"'g": ......... ~822 7,'13 ........... I q-F~T55:"T: ....... :~-' G ~".-'3
9200 8410,70 8323.75 14 56 S-68,39
°300 8507.37 Fsi20. 42 I~ fl. 2 S 69,10
..... gq'D0 ............... g664,lq ......... 851'7,19 '-' ' 1~ "30 .... S'- 68.69
9500 g700.92 8613.97 14 37 S 71..39
9600 8797.~9 871 0.54
.... · 22
.69
15 28 S 78.70 W 2.07
g 700 .............. 8 _~ 94:',"Og ......... :"T'8"f~ 07 · 1'4 ............. 1' 4~"T""S~ ....... : ...... ~'-88:,' 7 O'-W ........ 2 · 7 A
gROg 8990;96 890~.01 ].~ ll S ~8.79 W .37
~900 9087,94 gOOO.q9 1~ ~ S 89.60 ~ .2q
1994.03 S 2058.8~+ W 2R61~
2003.31 ,% 2082,69' ~,! 2~85,,::5
" '2012;39 S .......... 21'OG.23'"W .............. 2909.80
2~20.~7 S 2129.87 W 2932.52
2027.61 S 215A.91 W 2955,P, 4
......... 2030';"5i "S' ............ ~1"~'~'56~ ~977 · 1
2031.05 S Z205.38 ~ 2996.37
2031.39 S 2229.78 W 3015.0n
3 0100 9282.27 9195.~2 13 15 N 89.50
1C200 9379.70 9292.75 12 q8 N 89.20
] O,.,O0 ....... q'77";"73 ............... 9'390.38 .............. I2 ....... 1:'~ ................... N ..... 86,79
/iOqDC 9575,22 ~qSR,27 11 25 N
10495 9668.33 9581.38 1i 25 N 85.89
HORIZONTAL DISPLACEMENT : "111,_- .90 FEET ,n,T ~OU
THE-'-'CA"ECULATION""PR'OCEDURES"ARE BASED O'N' 'THE' U~E
OF' T H R
~ .... · 37 .................. 2'03 i'. G 0 ......
W ,50 2031.63 S 2277.02 W 3051.08
W .46 2031.37 S 2299,56 W 3068.01
W .......... . R,'l' .......... 2 0'30'.'G S .... S ........... 23'2'1%'IT~-- 3 0 ~'3"~91 .....
~ .78 2029.33 S 2341.58 W 30~8.55
W O.O0 2027.99 S 2360.3~ W ~111.90
l~, 4q DE6. 19 MIN. ~ESI
j "~"
! ANCHgRAGE, ALASKA
i.. SOl-!TO A~ASKA PETROLEUm. CO~.PANY DATE OF SURVEY DEC. 23,
'" Y-'I ~ "'(SE'C ~'3' T i'i~N ~ R 13 E ) .......................................................... COk'DUTAT'ION DATE
'~ PRUDPOE BAY DEC.EHBER 2~ 1980 ~OB NUMBER HOSS-1672D
~LASKA KFLLY BUSHING ELEV, : ~6,95 FT.
i ................................................................................................... : ................ ~ .......................... 0 PE R'ATO F- A'F'F L-~f~flC fi
.
INTERFOLATEB VALUES FOR EVEN 1000 FEET' OF MEASURED DEPTH
TRU
MEASURED VERTI
! ........... DEP 'rH ........................ DEPT
I
E SUB-SEA TOTAL
CAL VERTICAL RECTANC~LLAR COORDINATES MD-TVD VERTICAL
H ....................... D E P'T H .......... M-O RT H'/S'O U T 'h ............. E A S'T / W E~ T'--'D IFF ERE'N'C E ......... COR"FFECT-I'OI~'
0 OoOg -R6o95 10.00
1'00'0 ............ 9'9 .~'° 9G ................. g 13.'0'1 ......... 7.73
20,00 1999,94 1912,9~ 6,6.5 N 15,58
3000 2q98,78 2911,83 15,57 S 20,45 W 1,22
A'O' 0-6 ........ 3'~-~'J~'? ............. 3'73 g'J'~"~- ...................... 3'31 . .64" ~' ! 9'5';-5'9'""g'
5000 47A5,64 A858o~9 797,47 S'- 518, A4 W 25q.,16
) 6000 5575 4! 5~+88' fl-6 1202 88 .S 896,91 W q2~+- 59
?'O'O'-O .............. ~'9i',"~ 2 ............... ~'3'0 ~ ,"67 .......... 15'5'0";'S'~'" ~ ......... 135 9';' O'T'"' W ................ -6'0 G'i'98'
~O00 7262,36 7175.~1 18~1,43 S ~7q8,32 W 737,84
9[~00 ~217.55 8130.60 1975.02 S 2010,5~ g~ 7~2,~5
F ......................... I'06'b~ ......... 9 i ~'5'20 ~- ........ -~'09'8','07 .............. 20'3 K'g'O-"~'-'] ....... 2253;-7 ~:'-'~ ...................... -~'1 ~"; 9"~
~ 1P495 9668.33 9581.38 2027.99 S 2360.54 W 826.67
' THC'-"CAE'CUL"ATI"ON PR CC~DU'RES ARE' B.A"SED "'ON .... TH~. ...... USE' O'F'"'THREE
.02
1.1~
177,14
170,43
I'~"~-J3~. ......
128.67
A4.81
11.69
D I MEN'S IGN AL"-'R'A'D'IUF'OF .....C-U'R¥"A'TIJ-R .K-'PFETHOD ·
i ..... : ' ............... ......................... 77:; ...... 7 .......... 0 P E R A TO R-AFFL ERBA CH
I ...... '. I.¢~TERPOLATED VALUESiFOR EVEN 100 FEET O'F SUB-SEA DEPTH
ANCHORAGE~ ALASKA
SCHTC' ALiASKA PETROLELM COMP/1NY DATE OF SURVEY DEC, 23, 1980
Y-11 tS£'C33~'T]'l'N,R13E} ............................................... COMPUTATION DATE
F'RUDHOE BAY DECEMBER 29~ 1980 dOE NUMBER BOSS-1~720
ALASKA KELLY BUSHING ELEV, = ~6,95 FT,
PEASURED
............ :'D ET. P'T'H
TRUE SUB-SEA T OTA L
VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
D EP'TH ..................... D'E P'TH-.-':":7',1'C'FT H'/SO U'T'F ............ E-A ST/;JE,gT ....... D'I'F FE R'E'N"C'E' ......... CO'R' R'E CTTON
28
O 0.00 -86.95 10.00 t'-, O. OD
...... 86 .................. g;6.95 ........... O.'Ofl ................ 9";'90'-' N ....
186 186.95 100.00 9.57 N 1.53
6 286. c5.. 2mO. O0..:~ 9.20 N 2.51
6 A86.95- 400.00 8,65 ~ 4.15
586 5~ 6.~5 500,00 8.39 'N 5. O~
686' ....... 686';'95 ................... 'GOD.O0 ........................... ~,12 ..... N ............... 6,02
786 786,W5 700.~ .7.85 N 6,71
~g6 886,95 fiOO,OO 7,6q N 7,2I.
~86' .................. 98 6",'95 ................... 900.'00
i 1086 1086,95
i 1186 1186.95 110~0-00
................. ~ 2'86 ............ i'28'6', 95 ............... l 2",., O .' 0 ,.",
13B6 1386,95 1 300, O 0
1 a86 1 A86.95 I 400. 0
............... ] 58'6' ............... $58-G';"95'"~T .........
1686 16~6.95 1600,0
1.787 1786,95 1700,00
W ,01 ,01
W · O1 ,0 1
W .02 .00
W .03
W ,03 .00
U .04 .00
................... ?" .' ?' ff-'M
7.87 N 8.34 W .OA ,OC
7.fi3 N 8.76
.............. T~'fi3 N ..................... 9~'29 .... ~ ................. .'64 ....................... ~06
7.50 N
7.39 k 10.3~ ~ .aS .00
7';P'I'-'-
7.01 N 11.33 ~ .05 .00
6..fl5 N 11.85 W
.......
........... ' ............................................. SP'ERRy-sUN '~EL'~ ~URVEYiNG"CONP'/~N¥
ANCHORAGE~ ALASKA
SOHIn ALASKA PETROLEU~ CCt~PANY DATE OF SURVEY DEC 23e le80
Y'~] '(SEC~'3~Ti'i'N~RI~E) ....................... CONPUTAT'IOt~ DATE
DECEMBER 29, 1980 dOB NUMBER BOSS-16720
PP UDHOE
BAY
ALASKA KELLY BUSHING [LEV. = ~6.95 FT.
.............................................................................................................................................................................................. OP'ER
INTERPOLATED VALUES FCR EVEN 100 FEET .OF SUB-SEA DEPTH ........
TRUE SUB-SEA
t~4EA?URED VERTICAL VEPTICAL
r .......... DEP'T'R ......................... D -EP'TH ................... DEPTH'
i
, ]8,87 1~86.95 1RO0,OO
I9B'7 ........... 1-~A'G-"~5 ............... 1 900 · 0 O
2687 2086,95 2000,00
2187 2186,95 2100.00
TOTAL
RECTANGULAR COORDINATES MD-TVD VERTICAL
N :O'I~TH/~ OUT tq ..... E A S TI W~E'ST ..... DTFF E'R ENC'E"----COR' R'E'CT"~ O'N
6,73 N 12,5z~ W .05 ,DO
............. 6.64 N .......... 1'3. ~5-'W ............................ ."~-6 .................................. ;'0'0
6.~5 g lq.30 W .06 .00
6.16 ~, 1~.95 W .06 .00
, 6 0 ............................ 6'.';-15 .... R .......... 1 5.'-5I.'"'1~
· 6[~ 6.12 N 15.88
O0 5.98 m 16.80
· OO 5.~1 N 16. lq
2.787 2786,95 2700.00 ~..q. 7 ,'"~ 16,9:3 W .09
....................... 2 A-f4'7 ......... 2'~'~ 6 ,~95, ...... ~""P'~'O ¢ -;' ¢'¢ ....... ~'g'69~'"'S ............... 1"7;'9.'6~"'~ ...................... ~' 31'
2988 2986,95 29S[!,00 15.86 S I9,93 W 1,09
308~ 3086,95 3900,00 30,85 S 26,51 W 2,75
-
J192 ~i~G.~5 31[;0.8¢ 52';'!'I ~ .................... 5"5,-6' 6"" !,~ ........................... 5"41'
3295 3286.95 32n0.00 7G.Z~ S q7.01 ~ 8.95
3400 3386.95 3300.00 104.34 $ 60,79 W 13,73
361~ 35~6.95 3500.00 172.18 S 96.26 W 27.97
3725 3686.95 36~0,00 212.9~ S 119.59'W 38.~6
· '0'0
.00
.00
,0-0
.00
.2'2--
.77
1.65
3.53
~..78
,e-T;-2--rj-
8.0q
., 10.49
ANCHORAGE9 ALASKA
SOHIO ALASKA PETROLEUM COMPANY
¥-11 ¢SEC~3,TII'N,R13E') ................................ COMPUTATI6N DATE
PFUPt~OE BAY DECEMBER 29, 1980
AL ~SKA ..
DATE OF' SURVEY DEC. 23, 1988
dOB NUMBER BOSS-16720
KELLY BUSHING ELEV. = 86,95
FT.
I~,TERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
~.'E a~URED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL
H .......................... D E P-TH- ......................... [1 E P T'F! ......... ?N~O'RTH7 S O U T H- ......... E"~'S.%/~'~'S'T ........... D IF F"~'R.'E'N C~ ..... C'OR-R'E' CTYO '~- ~
5~5~ 37~6.95 3700.00 258.95 S 147,13 V~ 51.94 13.49
...... 395 .............. 5 g'8'6-';"'~5 ........... 3'8'00 .~0-0 ................ 311.44 S ..........18'0.53
AC, 77 3~g6.95 ~9(;,0.00 367.71 S 216.8q W 90.~9 20.36
4197 A086.95 4000.00 424.29 S 253.24 W 110.62 20.53
~438
5774
6013
~+286,95 ~200.00 536,62 $ 328, 2q
4386.95 ~+300.00 593. OZ~ S 367,50
'468"~ ............. -4 ~'8 '6'" 95 .................... q460 · ~ 0 .................~; 49';'7'3 ..... S .............. 40 ~ ,' 4:4
a804 q. 586,55 450D.00 706,85 S 450.65
fl927 4686.95 A600.O0 763.97 S 4.93.28
5050 ......... '4-78-'6'; 95 .............. 470'0,08 ........ '9 20'"74 -S ............... 5'35.99
5172 ~ 6,, 95 ASO0.OO H76.~4 S 57g.7P
5293 4986.95 49[)0.00 929.23 S 622.62
5A15 ........ 5086.95 ....... 50DO.DO ~'82.05 S ........ 665J98
5535 5186.95 5100.00 lP3A.45 S 798.83
~'656 5286.95 5200.00 1086.2~ S 751.1~
.... 538 6."B5 .............
5q86,95 5400.fi0
5586.95 5500.00
i130'91 S .... q: ....... 796,85
1168.7,3 S 848.76
1207,42 S 903.29
1.51,95 20,80
1.73.30 21,35
1 ~. 5"~ 3'2 ..................... 2
217.98 22,66
240,78 22.80
2'6'3 ,'4~ .......................
285.~9 22.05
306.93 21.43
32G',05 ......................21"'12
3A8.81 20,76
~69.11 20.30
4,06.70 1 R.8 6
A27.OO 20.29
S PtZ t~ R'Y' ;.;S U N-"~i;,,r E'. ['"'" S [J R V E Y ! N G ..... C G ~ P' AMY
ANCHORAGE, ALASKA
D~.TE OF SURVEY DEC. 23, 1980
COMPUTATION DATE
DECEMBER 29, 1980 ,JGP NUMBER BOSS-16720
KFLLY BUSHING ELEV. : 86.95 FT.
..................................................................... O'D E R'A"T' 0 R-A"FFELrR'B :~C'H
INTERPOLATED VALL'ES FOR EVeN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
F ............ D E P T H ........................ D'EP'T H ................. D'EFrT H ........... N CRT H '/S 0 UT H ......... 5 A ST/W E'S"F---D'I F FE RE N C E
t
6504 59436.95 5900, 0
G751 6186.95 6100,0
6R. 7~ 628.6.95 62D0.0
~9 9'5 ................ g ~g';'"9'5 .............. g 3 0'~
711~ 6~86.95
7233 6586.95 6500.0
7'350 ............. ~'~";"95 .......... -~'~ ~D'. 0
7~67 6786 95 ~700 0
7582 6886.95 6800.0
7~08 7086.95 7090.0
7918 7186.95 7~00.0
P133 7386,95 7300.0
VERTICAL
C 0 R'R E CT'IUN
6135 5686.95 5600.00
.~2 57 .......... 578'6".9 5 ............
6380 5886- 95 5HO O. 00 1331.12
0 1~7q.23,~
0 ................ 1. 4'l,q , 'D'Y'
0 1A61,gq
0 1505.71
0 ......... 1548~,~6'"
1247.37 S 959. O0 W 448.24 2.1.24
1288.62 ~ I0t6.03~W ~'7'0"53
S 1074.75 W A94.03 23.51
S 1133.53 W 517.78 23.75
S .......... 11'~ 1'.'6'~ .... k' ..................... 5'41 ;-45 ........................
S. 1248.38 W 56,~.54 23.09
S 1303,34 ~ 586,75 22,21
1590.06 S 1408.10 W 6.27.79
1630.11 S. 1A57.42 W 646.27
................ 16'(~ 9'J"19'~ ....... ' .... I-50 5: OI'-~ ............... ~'63-,' 7I
1707.5~ S 1550.85 ~,: 6fl0.21
0 17A4,51 S 159~.92 W 695.58
r.~ ........ 1777 ,'3 I':~"S
P 1803.6fl S 1681.32 W 721,~6
0 1826.17 S 1721. 57 W 731.4'2
0 ........... 1 ~'4'G",-~'3 ....... S'-,[ ..... i 75 6,"92 "W .................. 73g '-5'~'
O laGS.lO S" 1789.19 W 7~6.14
,~'~ 238 7~.fl6.95 7400.0,0 1880.6I. S 1818.80,W 751.73
19.6~
18.48
16.50
15.37
I3-JS'A'
12.0~
9.96
8-;'I'~
G.60
5.59
ANCHORAGE, ALASKA
SOHIC ALASKA PETROLEtJ.?~ COMPANY DATE OF SURVEY DEC. 23, 1980
Y-ii (S[C3'3'Til'N,R13E) ...................................... CO~4PUTATION DATE
Pr?UDHDE BAY DECEMBER 29, 1980 dOB NUMBER BOSS-16720
ALASKA KELLY BIJSItING ELEV. : 86,95 FT.
INTERPOLATED VALUES FCR EVEN 1DO FEET OF SUB-SEA DEPTH
l RUE SUB-SEA T
MEASURED VERTICAL VERTICAL RECTANGULA
DE' ~T'H ....................... D EP TH ........................ DEP'T H'~'T ............ NO. F.T H'! gC: UT
P343 7586.95 75DO,OD 1~.95.R9
............................. ~A~'7' 768 6.-'~5 ............... '7600','D 0-'-~ ......191D.2~
~552 778G.~5 7700.00 192~.DG
P65~ 78H~.~5 7800.00 ~7.1G
9TAL
R COORDINATES MD-TVD VERTICAL
H''~'" ........ E 'A'~'T ~-~ £ .~T'i ..... D TFF EFE N C £F ............... ¢O'R RE CT'I O
S 18z~6- 1 3 W 756-52 4,79
S ................. 187 2; 3'0 '"id .............. 7gG; 88 ...........................
S 1898.18 W 765.10 ~.22
S 1924. A1 W 76'9,,31
H864 898&.95 8000.00 1960'9~ S 1976,95 W ' 777,46
~gF, B ~G.95 ai. O0,O0 ~97~.9g S . 2~02.75-.-U'
9'67I ................ ~ 2~ 6-;'g 5 ................ '82"D'O~'' 0'~ ................... i'9'~'1',' ~ g' .... S ........ 2'02 ~-" 1"6 "W ..................... 7 g'4"
9175 8~86.95 8~00.00 1991,70 S 2052,94 ~ 7E8,47
.9278 8486.95 8.400.00 P
I o¢485 8686 95 8600.00 2
t ............... 9589 8786.95 8700. O0 2
9795 HqH6.95 8~;0.00 2
~898 ~086.95 9QOO.O~ 2
..................... lO'COY ............. 9186',95 ............... glo0'.O0 ......... 2
] OlO4 9286.95 9200.00 2
OO1.AO S 20,77.69
O,'I'O', 7'T"-'S--'? ~-"21"~'2' 0 g-~r~
tllq. R1 S 2126.41 W 798.61
027,04 S 2152.05 W 802.12
33 0 ..t) 5 'S ................ 217~.70"k' ..................... 865' g7
931.03 S 2204.37 W 8C8.92
~)31.59 S 2229.5~ W 812.G~
0~1.61'-~ ..... ; ...... 22'Sq'J21'--W ................ 815,
051.62 S 2278,12 W ~17,E6
10207' 9386.95 9~00.00 2~31.Z5 S 2381.21 'W 820.~.9
A.02
~.~6
3.t~9
3.31
3.50
3.12
2.82
2.G3
ANCHORAGE, ALASKA
b ....... ROHIO AL~SK/t PETROLEL~? COMPANY - DATE OF SURVEY DEC.
~, "Y-i.1 '(SEC~3,'TI'lN,RI3E) ................................ COf4PUTATIO'N DATE
I
1980
PRUDHOE HAY DECEMBER 29, 1980 uOF NUMBER BOSS-16720
~I_~SKA KELLY BUSHING ELEVo
r ~': ........................................... OP E"R A T O R- AF FE'ER'BAL'-H
= 86.95 FT.
TRUE SLJB-SE~
PF~SLJRED VERTICAL VERTICAL RECTANG[J
j............. D ~' P T F.~ .......................... DE.FrTH ...................... OEP T H ...... N 0 RT H'/S O
i I 0:309 9q86.95 94[f0.g0 2~30.5
....... 1'0411 .............. '958'~"; 95 ..... 95'~0;'~0 2029.1
10495 9668.33 9581.38 2827.9
TOTAL
L. AR COORDINATES MD-TVD VERTICAL
UTH ....... '-" E ¢-S T/W,r_ ST .... ~T~.I'F'FE'I~E ~C~ ............. COR REI~"'I'~rO N
6 S .....
9 S
2523o2q Y 822.89 2.~0
2 3 ~+':5.' 9q" "I4 ......................... 825';"02 .......................
23GD.34 W 826.67
tHE"' CA'L'cu'L",~'T'z'i~N" PR-(~'(:£'b'U'RE"~ .... USE;' A L INEAR'-
THE NEAP-EST 20 FOOT MD (FROM RADIUS C
I N'T F R P 0'[/~'T"i O.N ',-B
F CURVATURE) POINTS
0
GR[AT LAND DIR[CTIOIqAL DRILLING INC.
REPORT OF SUB-SURFACE DIRECTIONAL SURVEY
Al -] ] -8(1-D34-A
JOB NUMBER
A~AV
NAME
SOHIO
COMPANY _
~ Y-11-RD ~~~ WELL NAME '
PAD "Y" ALASKA
LOCATION %,~
Sinole Shot ~~1
llTk[
DEPTH INTERNAL
o~nn 10425
FROM TO
11/1'0/80,
DATES SURVEY WAS TAKEN FROM
12/7/80
TO
THIS IS A RECORD OF A SUB-SURFACE SURVEY
OF YOUR WELL
We have retained a copy of your survey report in our files for your
convenience; however, should you so desire, all copies of the survey report
will be forwarded to you on written request. All surveys are kept in a
locked file and are held in strictest confidence. Additional copies of your
survey report can be made from the original by any blueprint company.
¢OMPLET ION REPORT
SOHIO ALASKA PETROLEUM
MAGNETIC SINGLE.SHOT SURVEY
RADIUS OF CURVATURE METHOD OF COMPUYA't'~
CO~qPUTED FOR GLDD BY FH L INDSEY G ASSOC
DEPTH. ANGLE. DEPTH SEA DIREC
D M DEG.
_ 0 0 0 0.00 -86.95 N O.OOE 0.00 5 0.00 W 0.00 5 0 0 0 W
ASSUMED VERTICAL TO 2700.
2700 0 0 2700,00 2613,05 N O.00E 0*O0 $
2715 0 45 2714.99 2628.04 N 3.00W 0.09
2792 I 0 2791e99 2705.04 $22e0OW 0.23
'2-853 3-~5 2852'93 2765'98"
2885 4 Z~5 288~.84 2797,89 $ 5e00W
2948 6 ~5 29~7,52 2860,57
3010 8 45 3008.95 2922,00 519,00W 18.92
3147 11 ~5 3143.75 3056.80 525.0OW
3278 15 0 3271.18 3184,23 529.00W 68e50
3421 i8 30 3408*09 3321'i4~ '529~'00W
3609 2~ O 3583.85 3496'90 529*00W
3824 29 0 3777,00 3690,05 SS0'OOW
3915 32 0 3855.40 3768.45 S33.00W 285-0~
4104 33 45 4014.13 3927.18
4563 34 30 4394.09 4307.1~ S35.00W
~928 35 0 4693'99
5139 35 0 4866.83 4779.88 537'00W
5207 35 0 ~922.5~ 4835,59
~2 7~'~ ~'~-2' 45 .....497~6'~'5O' 4~8~8'9 ~ 5 ~ 546,O0W 910.71
530~ 30 ~5 5002.86 4915,91 $~7.00W 921,94
5364 29 0 5055,75 ~968,80 $50eOOW 952,07
0,00 W
0,00 W
0,83 W
0.00 $ O 0 0 W
OJ09 N 1 29 59 W
0,87 N 7z~ 9 40 W
4,29 W
13.4~1 W
27,17 W
19,40 5 12 4& 32 W
~3.63 $ 17 54 39 W
73.70 $ 21 38 1 W
148,29 W
204,16 W
348.14 W
321,31 5 27 29 6 W
423.53 $ 28 49 8 W
680.36 5 30 4~ 38 W
586 · 57
598.~0
621.16
1083,27 S 32 47 5 W
1099.12 S 32 59 1i W
1128,42 S 33 23 56 W
RECORD OF SURVEY
DEPTH ANGLE DEPTH SEA DIREC DISTANCE ANGLE
D M DEG. D M
9629 3~ 0 5276.32 5189.37
0 69.72 5z82.,77
5816 31 30 5~33.15 5346,20 549,00W 1126,65 S 787,19 W 1374,~2 S 34 56 ~O W
5934 33 0 5532.9~ 5445,99 $55,50W 1165,18 S 836,95 W 14~4,62 $ 35 41'22 W
. 624.3 35 0 5789,10 5702.,!5 $56~00W ..... ~262,42 $ 979,77 W 1598,02 S 37 48 54 W
6~66 36 15 5970,36 5883,41 $55'50W
lS?,o 6 oo. o
..7~19.6_~_~2_ %.5 6571,97 6485,.0Z.' $51
7565 29 45 6888,24 6801.29 $48.50W 1703.B~ $ 1964.79 W 231~,01 $ 42 ~4 19 W
7789 27 30 7084,85 6997.90 $57,00W 1768.25 S 1650,13 W 2418,~0 S 43 I 1~ W
7982 22 30 7259,71 7172,76 $6!,..50W 1809,93 S 1720,19 W 2496,98 S 43 32 37 W
8223 18 0 7485,7~ 7398,81 $60,50W
8510 16 0 7760.21 7673.26 $61':50W
8982 15 45 8214,20 8127,25
9452 14 30 8667.91 8580,96 S67,50W 1996,53 S 2094.94 W 289~.95 S ~6 22 40 W
10425 12 0 9614,94 9527.99 S89,50W 2040.72 S 2312.12 W 3083,90 S 48 3~ 4 W
bIEASURED DEPTH AND OTHF. R DATA FOR EVeRY :EVEN } : ~i T
TRUE
MEASURED VERT!CAL SUB ~D-TVD VERTICAL
....... DEPTH r~)E PT~ sE~' "~'i~FERENCE ~
187 187. 100 0 0 0.00 S 0,00 W
287 287. 200 0 0 0.00 S 0,00 W
387 387, 300 0 0 0,00 $ 0,00 W
487 /+8'7 · 400 0 -
::
.:
587 587 · 500 : 0
....... 687 687 · 6._00
787 787. 700 0 0 0,00 $ 0,00 W
887 887~ 800 0 0 0,00 $ 0,00 W
987 987, 900 0 0 0,00 $ 0,00 W
1387 1387, 1300
1487 1487. 1400
1587 1587. ~500
1687 ' 16871' 116100
1787 1787, 1700
1887 1887, 1800
1987 1987. 1900
2087 2087. 2000
2187 2187, 2100
2287 2287, 2200 0
2~87 2387, 2300 0
2 s7 24o0
2687 2687. 2600 0
2787 2787. 2700 0
0 0,00 S 0,00 W
0 O,O0 $ 0,00 W
0 0.00 $ 0,00 W
0.00 $ 0,00 W
0.00 $ 0.00 W
0.00 $ 0,00 W
0 0,00 5 0,00 W
0 0,00 $ 0.00 W
0 0.30 N 0,79 W
3191 3187. 3100 4 2 49,96 $ 17,48 W
329~ 3287. 3200 7 3 72.18 $ 29,19 W
3399 3387. 3300 12 5 98,70 $ 43,33 W
TRUE
MEASURED VERTICAL SUB MD-TVD VERTICAL
DEPTH D;PTH SEA D
3722 3687. 3600 35 10 204.85 $ 100.85 W
3835 3787. 3700 48 13 250.~1 & 126,86 W
~952 3887~ ~800 65 17 301.56 & 159.02 W
......................... --~- ......................... ~ .......... : ~T?~'-~. :'~7~:~ ~ ........ · ,,: :~.:.: :... ..... ..:... ...... : ::.~: .: ...... . :~-~'~: :~ : :.: :' ~.~
~071 3987, 3900: :
~ 192 ~ 087 · 4 O00
~33 4287e 4200 146 21 52~e18 $ ~06,33 W
~554 4387. 4300 167 21 580.36 S 3~5,23 W
............. ~__6.7~ ........... ~487. ~400 188 21 637e07 $ ~8~e93 W
~ 600 : 2 32 .... :::::: ::::::::: ::::::: :::::::::: 2::2:::.~:~:::.:::. :::: :::..'::::::::~: :::~::::::~===============================::::::::::::::::::::::::::::::~ :~:~::,.~:: .. ::::::::::::::::::::::::::::::::::::::::::::::::::::: :::::::: ::::~::::::::::::::::::::::::::::::::::::~':::;:::: ::::::::::::::::::::::: :::::.::::::::::::::::: ::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::
5163 4887. 4800 276 22 863.84 $ 5~6.9~ W
5284 4987. 4900 297 21 915e16 S 591e21 W
5400 5087. 5000 313 16 954e~1 S 63~.60 W
................... ~-~'-i ............... S leT. 5100
5879 5~87. 5400 ~92 18 11~7.78 S 812,92 W
5999 5587. 5500 411 19 1185.55 S 866e15 W
6119 5687, 5600
............ - -Z4 0 ................. Sift' :-7::
6610 6087. 6000 523 2~ 138~.~0 S 1156.2~ W
673~ 6187. 6100 546 23 1526e06 S 1214e06 W
6855 6287. 6200 568 22 1466.83 S 1270e53 W
7331 6687. 6600 644
7448 6787. 6700 661
7563 6887. 6800 676
17 i626.60 $ 1~+7~.19 W
17 1665.59 $ 1519.71 W
15 1703.96 S 1562,97 W
?..:. :.:.: ::::: ::.: :~: ;:: .?: :: :':::..~: :~:: :: ?: :~::~: ;i;i;iL: i.
TRUE
MEASURED VER T ! (:;AL SUB MD-TVD VERT ! CAL
7903 7187, 7100 716 12 179~, 55 S 1692,~0
8011 7287, 7200 724 8 1815,26 $ 1729,78
8118 7387, 7300 731 7 1834,11 $ 1763,30
86~2 7887, 7800 755 ~ 1908,23 8 1898,~3
87~6 7987, 7900 759 4 1921,19 S 19Z3,80
916i 8387~ 8300 77~ 3 1967~8 8 2016~Z~
9265 8~87, 8400 778 ~ 1978,27 $ ~050,9~
368 8587~ 8500 781 3 1988,72 $ Z075,~
9781 8987, 8900 79~ 3 2022,95 S 2170,
988~ 9087, 9000 797 3 2028,88 $ 2%93,72
998? 9 Z8'79 9100 800 3 20~3,72 $ 22%6,79
-=-=.-~ ...... -,-~?=?=~-" ?- ...... ::-::--:;:"'~:=:'-=z~:::' ~7':::~'~ .'."'.:.." :,' : :':: "::' :::':::: ::~':::: 9.' ~ · Z2:~9 ,'5 7
TRUE
MEASURED VERT !CAL SUB
3000 2999. 2912. 17.50 5 3.85 W
4000 3927. 3840e 323e23 $ 173.09 W
7189. 18t~,25 S 1726.17 W
8000 7276.
9000 823t,
i0000 9200.
8144, 1950.11S 198~,73 W
9113. 2034.2~ S 2219.80 W
HORIZONTAL VIEW
SOHIO PETROLEUM AL ASKA
WELL Y- II RD
RADIUS OF CURVATURE
/
MAGNETIC SINGLE SHOT SURVEY
SCALE I% I000'
JAN. 19, 1981
TVD = 9615'
TMD = I0~ 425'
, ARE TVD
ALL DEPTHS SHOWN
Suggested form to be inserted in each "Active" well folder to check
for timely compliance with our regulations.
Operator, and Number
Reports and Materials to be received by: "/D~t/--~/
Required Date Received Remarks
Completion Report Yes [
Well History Yes
_Samples ~'L~': ~
Mud Lo:j ,,
·
Core Description ./~0 /6
a,, ,,,,,, , ,,,,- ::',,, ,
Registered Survey Plat
............ ,
Inclination Survo7 .-~ _ .......
~,~ ,,, , ,,,,,
Directional Survey y~_~
-- ,, ~ ,,, . , ,
Drill Stem Test Reports ~~:.
ProdUction Test Reports ~_-----
Logs Run, Yes l--/ :"~(~/ L~.K. +~.~
u , .....
Digitized Data y~., ~ /-- ~ ---~/ 0 ~''.
·
SOHIO ALASKA PETROLEUM COMPANY
January 15, 1981
3111 C STRE~
· ' ~' I ',_,
CONFID~~: "~_' "' :
i ! $~A, TTFC--I
Alaska Oil & Gas Conservation~ission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Y-11, Redrill 91 (33-33-11-13)
Enclosed, in duplicate, is Form 10-404, Monthly Report of Drilling
and Workover Operations, for the above-named well for the month of
December, 1980.
RHR: ja
Enclosures
cc: Well File #17
Yours very truly,
District Drilling Engineer
STATE OF ALASKA
" ' A LAS K~".' L---. AND GAS CONSERVATION C( I M ISSlOU'~
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
1. Drilling well []
Workover operation []
2. Name of operator
Sohio Alaska Petroleum Ccapany
3. Address
Pouch 6-612, Anchoraqe, Alaska
99502
4. Location of Well
at surface
1433' SNL, 313' WEL, Sec. 33, TllN, R13E, UPM
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 86.95' AMSL
6. Lease Designation and Serial No.
ADL 28287
7. Permit No.
80-134
8. APl Number
5o- 029-20513-01
9. Unit or Lease Name
Prudhoe Bay Unit
10. We~ No. (33--33--11--13)
Y-11 Redrill #1
11. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
For the Month of December
,19 80
'12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Depth at month-end: 10495'
Footage drilled: 10495'
13. Casing or liner run and quantities of cement, results of pressur9 tests
Directionally drilled 12 1/4" hole to 9540'. Ran 250 jts. 9 5/8" 47~ L-80 Buttress
casing to 9530'. Cemented in 2 stages: 1st stage with 1320 cu.ft. Class G; 2nd stage
through DVpacker @ 2581' with 130 cu.ft. Permafrost C cement preceded by Arctic Pack.
Tested casing to 3000 psi, okay. Ran 36 jts. 7" 299 L-80 Buttress liner to 10472'.
Cemented with 462 cu.ft. Class G cement. Tested liner to 3000 psi, ok. Ran 225 jts.
5 1/2" IJ4S tubing to 9079'. Tested tubing to 3500 psi, ok. *
14. Coring resume and brief description
None
15. Logs run and depth where run
DTL/$2/BHCS/GR @ 10436'
'DC/Q /G /Cal @ 10452'
CBT,/v-D ,/CC /GR @ 10412'
6. DST data, perforating data, shows of H2S, miscellaneous data
Released rig at 0730 hrs., December 17, 1980.
17. I hereby Certify that the foregoing is true and correct to the best of my knowledge.
SIGNED TiTLEDistrict Drilling EngineerDATE %-! ~, ~. \
NOTE--Report on this form is requir~ for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10-404 Submit in duplicate
Rev. 7-1-80
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
TO:
STATE OF ALASKA
~ C6M~
3111 '~' o-ri"'--/ J R~5 ~N~
ANCHORAGE, ALASK
TELEPHONE (907) 2~-(
MAI L: POUCH ~612
ANCHORAGE, ALASKA 9' ~-1
1/7/81 #562
FILF
REFERENCE:
SOHIO FINAL DATA
The'following material is being submitted herewith. Please acJ<n0wledge receipt by signing.a .
copy of this letter and returning it to this office:-
¥'-11 AD#1 DTI:,/S~ 11/30/80 & 12/7/80
Y-ll RD#I BHCS 12/7/80
Y-11 RDttl FDC/CNL 12/7/80
~-11 ADII1 ~/)C 12/7/80
#1&2
#2
#2
#2
Y-11 RD~i GyroscOpic Survey
12/23/80
2'-" & 5tt
2',' & 5"'
2" & 5":
2'-' & 5'-'._
~C~mro1 Kri&ter
Well Records
January 13, 19 81
Mr. R. H. Re iley
District Drilling Engineer
Sohio Alaska Petroleum Company
Pouch 6-612
Anchorage, Alaska 99502
Dear Mr. Reiley: ~,',
,
Having issued a permit for each of the 'subject wells,:'we wil '~'"'~'~:~''"',~"~?~%:.~:~~ .....
need a Well Completion Report on each to complete our files.
The deep part of P.B.U. Y-11 was abandoned in November when the
plugs were set, and a Form 10-407 should be sent with to re-
flect this abandonment.
P.B.U. Y-11 RD was active in December, and a separate Form
10-407 should be forwarded upon completion, abandonment or
suspension of this redrill.
Sincerely yours,
/
.,"bohn A. Levorsen
Petroleum Geologist
JAL: mm
SOHIO PETROLEUM COMPANY
Division of Sohio Natural Resources Company
SOHIO-BP ALASKA PRODUCTION DIVISION
A~CO
TO: EXXON
PHILLIPS ......
SFO
TATE
Q~. ~ , ,'
....
......
:3111 "C" STREET
ANCHORAGE, ALASI'[A ,J ,.', ~h.j.~,_. ~ ....
i ~ ..,;~
TELEPHONE (907) 265 D00~ ,! '.:~'J:'G '
MAIL: POUCH ~61:~
ANCHORAGE, ALASKA99502-
[ ~0:~;~',.
~/5/8~ #556 .... j STATTFC
.~ ..................
CONFER'J~-~ ~
(~=Sent d~rectl7 to 7ou from Sch. ~Ventura)
REFERENCE:
MAGNETIC LIS TAPES
The following material is being submitted herewith. Please acknowledge receipt by signing a
copy of this letter and returning it to this office:-
AEP/SFO/ST:
C-13 Magnetic .Lis Tape 6/14/80 #1 #60616
*N-10 i " " " 12/13/80. #2 .f/61255
" " " 12/7/80 #2 #61241
Carol Krieter
Well Records
STATE OF ALASKA
.ALASK~'~ ~lL AND GAS CONSERVATION C(~ AMISSION
MONTHLY REPORTOF DRILLING AND WORKOVER OPERATIONS
1. Drilling well [~[ Workover operation []
2. Name of operator 7. Permit No.
Sohio Alaska Petroleum C~y 80-134
3. Address 8. APl Number
Pouch 6-612, Anchorage, Alaska 99502 50-029-20513-01
4. Location of Well
at surface
1433' SNL, 313' WEL, Sec. 33, TllN, R13E, UPM*
*Corrected
5. Elevation in feet (indicate KB, DF, etc.)
KBE = 86.95' AMSL
6. Lease Designation and Serial No.
ADL 28287
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well No.
Y-11 Redrill #1
1 1. Field and Pool
Prudhoe Bay
Prudhoe Oil Pool
For the Month of. ~ovember ,19 80
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Depth at month-end: 9540'
Footage drilled: 4332'
13. Casing or liner run and quantities of cement, results of pressur9 tests
Well Y-11 was plugged back by laying cement plug from 9810' to 9660' and from 5492' to
5292'. KiCked off from 4202' and Dynadrilled to 5708'. Drilled and surveyed to 9540:''.
14. Coring resume and brief description
GR/SP/DIL, HDT at 9540'.
15. Logs run and depth where run
1 6. DST data, perforating data, shows of H2S, miscellaneous data
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
% ' ' ' District Drilling Engineer
:iSIGNED - TITLE, . DATt: ·
NOTE--Report on this form is required foil each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15thof,the succeeding month, unless otherwise directed.
Form 10-404 .' Submit i'n duplicate
Rev. 7-1-80
November 14, 1980
Mr. R. H. Reiley
District Drilling Engineer
Sohio Alaska Petroleum Company
Pouch 6-.612
Anchorage, Alaska 99502
Re: Prudhoe Bay Unit Y-11 RD ,
Sohio Alaska Petroleum Company
Pe rmi t No. 80-134
Sur. Loc.: 1442~SNL, 361'WEL, Sec 33, TllN, R13E, UPM.
Bottomhole Loc.= 3280'SNL, 2810tWEL, Sec 33, T11N, R13E,
UPM.
Dear Mr. Reiley:
Enclosed is the approved application for permit to drill the
above referenced well.
Well samples and a mud log are not required. A directional
survey is required.f If available, a tape containing the
digitized log information shall be submitted on all logs for
copying except experimental logs, velocity surveys and dipmeter
surveys.
Many rivers in Alaska and their drainage systems have been
classified as :important for the spawning or migration of
anadromous fish. Operations in these areas are subject to AS
16.50.870 and the regulations promulgated thereunder (Title 5,
Alaska Administrative Code}. Prior to commencing operations
you may be oontacted~ by the Habitat Coordinator's office,
Department of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title 18, Alaska Administrative Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
Mr. R. H. Reiley
Prudhoe Bay Unit Y-11 RD
-2-
November 14, 1980
commencing operations you may be contacted by a representative
of the Department of Environmental Conservation.
Pursuant to AS 38.40, Local Hire Under State Leases, the Alaska
Department of Labor is being notified of the issuance of this
permit to drill.
To aid us in scheduling field work, we would appreciate your
notifying this office within 48 hours after the well is
spudded. We would also like to be notified so that a repre-
sentative of the commission may be present to witness testing
of blowout preventer equipment before surface casing shoe is
drille4.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
witness present.
Very truly yours,
Hoyl~ H. Hamilton
Chairman of S¥ O~ O~ ~ HE C0~.~:$s~_o~4.
Alaska Oil & Gas Conservation Commis~%on
Enc lo sure
cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o/encl.
Department of Labor; Supervisor, Labor Law Compliance
Division w/o encl.
HH~:be
SOHIO ALASKA PETROLEUM COMPANY
November 14, 1980
3111 "C" STREET
ANCHORAGE, ALASKA
TELEPHONE (907) 265-0000
MAIL: POUCH 6-612
ANCHORAGE, ALASKA 99502
Alaska Oil & Gas Conservation Con~nission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attn: Mr. H. H. Hamilton
Gentlemen:
Well Y-11R (33-33-11-13)
Further to our verbal conversation of November 13, 1980, we
propose to redrill Well Y-i~R (33-33-11-13).
Enclosed are the following documents, in triplicate, together
with our check for $100 to cover the permit filing fee.
1. Application for Permit to Drill,
2. Proposed Drilling Program Outline,
3. Surveyor's Plat showing well location,
4. Blowout Prevention diagram,
5. Directional Plan.
RHR:ja
Enclosures
cc: Well File #17
Yours very truly,
District Drilling Engineer
ECE VED
Alaska 0ii & ~s Cons. Commissio~
STATE OF ALASKA
ALASKA/ _ AND GAS
CONSERVATION CIa' MISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work.
DRILL []
REDRILL []
DEEPEN []
lb. Type of well
EXPLORATORY []
DEVELOPMENT OIL []
DEVELOPMENT GAS []
SERVICE [] STRATIGRAPHIC []
SINGLE ZONE []
MULTIPLE ZONE []
2. Name of operator
Sohio Alaska Petroleum Company
3. Address
Pouch 6-612, Anchorage, Alaska 99502
4. Location of well at surface
1442' SNL, 361' WEL, Sec. 33, TllN, R13E, UPM
At top of proposed producing interval
3160' SNL, 2470' W~_~L, Sec. 33, TllN, R13E, UPM
At total depth
3250' SNL, 2810' ~L, Sec. 33, TliN, R13E, UPM
5. Elevation in feet (indicate KB, DF etc.)
KBE = 86.95' AMSL
6. Lease designation and serial no.
ADL 28287
9. Unit or lease name
Prudhoe Bay Unit
10. Well number
Y-11 RD (33-33-11-13)
11. Field and pool
Prudhoe Bay
Prudhoe Oil Pool
12. Bond information (see 20 AAC 25.025)
Type Blanket Surety and/or number SiA~FECO Ins. 2975387
Amount $200,000.00
13. Distance and direction from nearest town
l0 miles NW of Deadhors~les
14. Distance to nearest property or lease line
!020' N of ADL 47471 feet
16. Proposed depth (MD & TVD) 17: Number of acres in lease
10800'MD 9600'TVD feet 2560
19. If deviated (see 20 AAC 25,050) 120. Anticipated pressures 3330
KICK OFF POINT 2800 feet. MAXIMUM HOLE ANGLE 35 oI (see 20 AAC 25.035 (c) (2) 4480
15. Distance tO 6earestdrilling ~r~e.~o_rt~llte~et
weU3387 ' S Put River !eet
18. Approximate spud date
~to~r 24, 1980
psig@ Surface
psig@. 9200 .ft. ~J~ (TVD)
21
Proposed Casing, Liner and Cementing Program
SETTING DEPTH QUANTITY OF CEMENT
SIZE
Hole I Casing
36" 120 "x30"
17 1/2113 3/8
12 1/4/ 9 5/8
/
8 1/2t7"
Weight
Insula~
72~
47~
29¢
.ed CondUctor I
L-S0 ButtI
-s0 /Butt[
L-80 1Butt I
22. Describe proposed program:
Length
MD TOP TVD
SurfacelSurfac(
SurfacelSurfac{
I
Surface'Surfac(
I
I
9200' 1,8780'
MD BOTTOM TVD
110'I
2662'I
9700'1
I
!0800'I
(include stage data)
110' 12 cu.yds, concrete
2662' 3720 cu. ft. Permafrost
8700'
9600'
1400 cu. ft. Class G:
130 cu.ft. Permafrost
280 cu. ft. Class G +
18% salt
See attached proposed drilling program outline.
REC JVEi)
Alaska Oil & ~s Cons. Commission
A~olaue
23. I hereby~fy~o~_~e ~.~d correct to the best of my knowledge
SIGNED k) ~-"~-..~ q ~ TITLE District Drilling EngineeDATE Ii' J~' ~
The space below for Commission use N
CONDITIONS OF APPROVAL
Samples required Mud Icg required Directional Survey required APl number
~'NO []YES [~.NO ,]~.YES []NO 50~- OLf- 7. O3'/~.~ ~
{-]YES
Permit number ~;//~i--/~ ~ Appr~/~_a4?80 SEE COVER LETTER FOR OTHER REQUIREMENTS
by order of the Commission
Form 10-401 Submit in triplicate
Rev. 7-1-80
PROPOSED DRILLING & CY]v[PLETION PROGRAM OUTLINE
~.f. Y-il R (33-33-11-13)
Confirmation of verbal approval given to R. H. Reiley by H. H. Hamilton
on November 13, 1980.
Run multi-shot survey from T.D. to 13 3/8" casing shoe. Lay a 150-foot
cement plug from PBTD of 9820' to 9670' BKB. Lay a 200-foot balanced
plug from 5500' to 5300' BKB. Kick off at approximately 5350' and
directionally drill 12 1/4" hole to 8700' TVD. Run 9 5/8" 479 L-80 Butt-
ress casing to 8700' TVD and cement first stage with 1400 cu. ft. cement.
Cement second stage through D.V. packer collar at 2600' with 130 cu. ft.
Permafrost I cement. 9 5/8" casing will be hung at surface, the 9 5/8" x
13 3/8" annulus will be Arctic Packed.
Directionally drill 8 1/2" hole to T.D. at 9600' TVD. Cement 7" liner to
500' inside 9 5/8" casing shoe with 280 cu. ft. Class G cement with 18% salt.
Run 4 1/2" 12.69 L-80 AB-modified Buttress tubing with a production packer
assembly at 8730' TVD. A subsurface safety valve with dual control lines
will be placed at 2000'. Displace tubing to diesel.
Install and test Xmas tree.
Suspend well for perforating subsequent to rig release. Details of proposed
perforations to be submitted on Sundry Notice to follow.
TOS:ja
11/14/80
Ot
O2
O3
04
22
,o ~o ~o .o ,o ~o ~o ~o ,o PA D O E T A i L
-
~ (4ctuol) ~qlO ,,
~ SCALE i :300'
. F2~-27-11-13} · y-2
V-4 ~ Y-2 (Actual} J~ (14-~7-11-1~) j
Y-6 (Acfuel) Pr~ ijJ~ j
:~
OI (23-28-11-1~) * Y-6
-~'~~ : ~0o,6,05.6,,, . o
OZ LoNG.=I48°49' 21.96"
'
O~ =~1 (PropoIed) J ~/ CActual) I il N ' JJ J
T' JO N' t 34-~-I1-t~) ~ y-II
PORT ON OF T N, R [, UM
CERTIFICATE OF SURVEYOR ~.
! hereby certify that lam properly registered to ~
- ........... J[./~z NOTE~at dated Aug ~0, 1979 changed to
practice land surveying in the State of AlasKa ana mat ~s plat"~ '; .
. ~ ".-C~ ,. ~ Oct 2, i979. Bottom hole loc. 1,5
represents a location survey of the wellpad shown and the, ~J'~ ~ %' -.J~/'~;;~'"r~ 6 chan=ed.' a
thereon. This survey was made by me or under my supervisio~?3Co.
. . . '~;b$~ :93 Revised Bottom Holes Y I, Y 2,Y 5
and all dimensions and other details are correct. Bo,tom hole -ate. 'Cam
:~:~ '~/~ Y-6 from Proposed to Actual
locations are furnished by others. ~B 6/~5/80
~ Add Proposed Y-II BHL
Date Surveyor PJ.R. 9/26/80
- ~A~, ,
....
~' ~-'" * "-~$' PA D
~ ~/ ~ *:~ Located in
..... ~ ~ NE I/4 ~ NW (/4 PROTRACTED SEC. 53 ~ ~,T IIN.~.I3E.,UM.~A[
~ *~ 4qtN ~ ~ ~~o Surveyed for
.
~ * ~ ...... ,, ~ .... ~ ~ . Surveyed by
~~ ~.~ ...... ~:~ ~ ~~ F. ~. LIN DSEY
',.~' .*.,m, ..... :,',~, ~1/,~0 LAND & HYDROGRAPHIC SURVEYORS
~~?~' 2502 West Northern Lights Boul. evard Box 4-081
Anchorage Alaska
B.O.P. STACK CONFIGURATION
~i, T,~,~ ,~ ....... s'r,~--
5000 PSI WP
DRILLING
ANNULAR
PREVENTER
KILL LINE
PIPE RAMS
BLIND RAMS
DRILLING
SPOOL
CHECK GATE GATE GATE
CHOKE LINE
HYDR. ASST.
GATE
PIPE RAMS
J-LJJ. '-
I L I..L L,
PHASE II
·
9. Y=5974755.35
X= '530921.60
LAT. 70° 20'31.5137".
LONG. 149° 44' 56.599"
568'FNL, 1252' FWL
I0. 3'= 5974755.;57
X= 530861.81
LAT. 70°20' 31.5165"
LONG. 149°44'5~345"
568' FN~, 1192' FWL
I I. Y= 5974755, 40 X= 530801,57
LAT. 70° 20'31, 5190"
LONG, 149°45'00,,105" ·
568' FNL, 11;52' F~/L
·
NOTES;
12. Y= 5974755.:51
13.
SURVEY 6
I
D.S. A
2
VICINITY MAP
Scale:' I ==lmi.
14.
PHASE I
X= 530741,58
LAT. 70° 20' 31. 5206"
I. ALL. Y 6'X COORDINATES ARE ALASKA
STATE PLANE,ZONE 4.
2. DISTANCES TO SECTION LINES ARE GEODETIC.
3. SEE REE DWG. 22988, SHT. 7Y-12-3OOI,REV. 7A.
4. DRILL SITE AND Y ~ X COORDINATES ARE
BASED ON MONUMENTS I.Y WEST AND
I.Y MIDDLE BY LHD A~JSOClATES.
15. Y= 5975115.51
X = 5;5086 I.,3.7 ' ,
LAT. 70°20 ;55.0587
LONG. 149°44' 58.$15"
208' FNL, 119;5' FWL
16. Y'-5975115.;56 ·
X-- 530921.68
LAT. 70° 20';55.0547"
LO NG. 149°44 ' 56. 552"
208' FNL~I254'FWL
CERTIFICATE
IANUARY $0,1983.
ARCO Alaska, Inc.
Kuparuk Project North Slope Drilling
D.S. IY CONDUCTORS
AS-BUILT LOCATION
PHASE I
·
date' FEB. 198;5 iscale' I"=
drawn by ' J.B./D.E ! dwg. no. NSK 9.05 d. 17
LONG. 149°45' 01.858"
568' FNL , 1072' FWL .
Y= 5975115.63
X'- 530741.~4
LAT. 70°20 35.064~"
LONG. 149° 45'01.813"
207'FNL, 1074 FWL
Y=5975115.61
X'- 5;50801.96
LAT. 70 o 20' 35.0621"
LO NG. 149° 45'00.050"
208'FNL ~ 1134' FWL
I.HEREBY CERTIFY T. HAT I AM PROPERLY REGISTERED AND
LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF
.
ALASKA, AND THAT THIS PLAT REPRESENTS A SURVEY MADE
UNDER MY DIRECT SUPERVISION, AND THAT ALL.DETAILS ARE
CORRECT AS OF ,,
·
lllll~lll . f [111 lllllllll
CHECK LIST FOR NEW %~LL PERMITS
Item Approve
(1) Fe__~e
(3)
/
(4) Casg. ~~
( 5 ) BOPE ~~,
Date Yes 1. Is the permit fee attaChed .......................................
2 Is ~ell to be located in a defin ol ...........
·
3. Is a registered survey plat attached ................................
./
4. Is well located proper distance frcm property line ..................
5. Is well located proper distance frcm other wells ...................
6. Is sufficient undedicated acreage available in this pool ...........
7. Is well to be deviated .............................................
8. Is operator the only affected party ................................
No
Lease & Well No. P',/~'~
Ren'~rks
9. Can permit be approved before ten-day wait ..........................
//-/~.f~ 10. Does operator have a bond in force ........... - ............ .... ....
'11 Is a conservation order needed ................
12. Is administrative approval needed ...................................
13. Is conductor string provided ........................................ ~Z~ ;.~.
14. Is enough cement used to circulate on conductor and surface .........
15. Will c~ment tie in surface and intermediate or production strings ...
16. Will cement cover all known productive horizons ..............--- --
17. Wil 1 surface casing protect fresh water zones .......................
18. Will all casing give adequate safety in collapse, tension and burst.
f~/l~/~ 19. Does BOPE have sufficient pressure rating- Test to .~O~o psig .. ~' Approval R~c~ded:
Additional Requirements:
Geology:
Engin,eering:
rev: 03/05/80
Well Histo.ry File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file,
To improve the readability of the Well History file and to
simplify finding information, information, of this '
nature is accumulated at the end of the file under APPENDIX.
..
No 'special'effort has been made to chronologically
organize this category of information.
.o
Run 1'
27 - December - 1993
PDK-1001GR
Borax Log
!0330
Tape Subfile 2 is ty ~ LIS
TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
Y -11
500292051301
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
17-JAN- 94
5157.01
K. BRUNNER
C. MICHEL
33
lin
13E
1433
313
86.90
85.90
OPEN ,HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING
2ND STRING 9.625 9420.0
3RD STRING 7.000 10472.0
PRODUCTION STRING 7.000 9030.0
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
BHCS
GR
2
1
18-NOV-80
SWS
LDWG TOOL CODE:
LDWG CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
47.00
29.00
26.00
BASELINE DEPTH
9585.0
9598.5
9618.0
9649.5
9658.5
9662.0
9662.5
9669.0
9672.5
9674.0
9677.0
9677.5
9679.0
......... EQUIVALENT UNSHIFTED DEPTH .........
GRCH
9585.0
9597.5
9616.5
9649.0
9657.5
9661.0
9662.0
9668.0
9672.0
9672.5
9677.5
9678.0
9678.5
9682.5
9686.0
9689.0
9692.5
9696.0
9701.0
9701.5
9703.0
9704.0
9710.5
9711.0
9712.0
9724.0
9736.0
9736.5
9737.0
9738.0
9740.5
9741.0
9744.5
9745.5
9746.5
9747.5
9748.0
9762.5
9763.5
9764.5
9770.0
9774.0
9785.0
9789.0
9791.5
9795.0
9832.0
9840.0
9859.0
9882.5
9887.0
9894.0
9901.0
9902.5
9903.0
9904.5
9905.5
9908.5
9909.0
9909.5
9910.5
9923.0
9937.0
9947.0
9953.0
9968.0
9975.0
9980.0
10076.0
10100.5
10101.0
10102.0
10107.0
9686.0
9690.5
9693.5
9696.5
9700.0
9700.5
9702.5
9703.5
9711.0
9711.5
9712.0
9724.0
9736.0
9737.0
9737.5
9738.0
9738.5
9739.0
9743.0
9744.0
9744.5
9745.5
9746.5
9761.0
9761.5
9762.5
9770.5
9774.0
9785.5
9789.0
9791.5
9795.0
9832.0
9840.0
9859.5
9883.0
9888.5
9895.5
9901.5
9903.0
9904.0
'9905.5
9906.0
9909.0
9910.0
9910.5
9911.0
9923.5
9937.5
9949.5
9955.0
9968.5
9975.5
9980.5
10077.0
10101.5
10102.0
10102.5
10107.5
10109.5
10110.0
10113.0
10115.0
10116.0
10118.0
10124.0
10136.0
10183.0
10184.5
10188.5
10189.5
10196.0
10201.5
10224.0
10227.5
10228.5
10229.5
10264.5
10267.0
10271.0
10298.0
10326.0
10345.0
REMARKS:
~110.0
10111.0
10113.5
10116.0
10116.5
10118.5
10124.5
10136.5
10184.0
10186.0
10190.0
10190.5
10197.0
10203.0
10225.5
10229.0
10229.5
10230.5
10266.0
10268.5
10272.0
10299.5
10327.5
10345.0
PDK-100/GR Borax Log.
LOG TIED INTO CBL RUN 15-DEC-1980.
THIS WELL IS A PRODUCED WATER INJECTION WELL.
LOGGING PROGRAM ORGANIZATION:
1. LOGGED A STATIC BASELINE PASS.
2. LOGGED A PASS WITH 50 BBLS BORAX AWAY.
3. LOGGED A PASS WITH 150 BBLS BORAX AWAY.
4. LOGGED A PASS WITH 300 BBLS BORAX AWAY. THIS
IS ALSO LABELED AS A FLUSH PASS.
A DIFFUSION CORRECTED SGMA CURVE IS INCLUDED FOR THE
STATIC BASELINE PASS. THE CURVE IS NAMED SGNT AND
WAS CORRECTED WITH THE FOLLOWING PARAMETERS:
BOREHOLE SIZE = 8"
CASING SIZE = 7"
SALINITY = 25,000 PPM
OPEN HOLE GAMMA RAY FOR DEPTH MATCHING DOWNLOADED FROM
BP EXPLORATION UPS/CSS ON 14-JAN-94.
SHIFT PROCEDURE AS FOLLOWS:
1. FIRST PASS GAMMA RAY DEPTH MATCHED TO PREVIOUS
OPEN HOLE GAMMA RAY.
2. FIR PASS SGMA DEPTH MATCHED 'SHIFTED" FIRST
GAMMA RAY ·
3. ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS GAMMA RAY.
4. ALL SUBSEQUENT SGMA (PDK) PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS SGMA.
/ ? ?MATCH1A · OUT
$
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH STOP DEPTH
9588.0 10330.0
9600.0 10342.0
BASELINE DEPTH SGMA
9585.0 9585.0
9618.0 9616.5
9649.5 9649.0
9658.5 9657.5
9662.0 9661.0
9662.5 9662.0
9669.0 9668.0
9682.5 9682.5
9686.0 9686.0
9692.5 9693.5
9696.0 9696.5
9703.0 9702.5
9704.0 9703.5
9710.5 9711.0
9717.0 9715.0
9724.0 9724.0
9727.0 9727.0
9736.0 9736.0
9736.5 9737.0
9737.0 9737.5
9738.0 9738.0
9759.0 9756.5
9770.0 9770.5
9774.0 9774.0
9785.0 9785.5
9789.0 9789.0
9791.5 9791.5
9795.0 9795.0
9792.5 9793.5
9832.5 9833.0
9840.0 9840.0
9843.0 9843.5
9859.0 9859.5
9875.0 9876.0
9882.5 9883.0
9887.0 9888.5
9889.5 9890.5
9894.0 9895.5
9901.0 9901.5
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
9902.5
9903.0
9904.5
9905.5
9908.5
9909.0
9909.5
9910.5
9923.0
9937.0
9947.0
9953.0
9968.0
9975.0
9980.0
9988.5
9999.0
10025.5
10076.0
10100.5
10101.0
10102.0
10107.0
10109.5
10110.0
10113.0
10115.0
10116.0
10118.0
10124.0
10136.0
10183.0
10184.5
10188.5
10189.5
10196.0
10201.5
10224.0
10227.5
10228.5
10229.5
10264.5
10267.0
10271.0
10298.5
10312.0
10323.0
10326.0
10334.0
10345.0
$
REMARKS:
9903.0
9904.0
9905.5
9906.0
9909.0
9910.0
9910.5
9911.0
9923.0
9937.5
9949.0
9955.0
9968.5
9975.5
9980.5
9989.5
10000.0
10026.0
10077.0
10101.5
10102.0
10102.5
10107.5
10110.0
10111.0
10113.5
10116.0
10116.5
10118.5
10124.5
10136.5
10184.0
10186.0
10190.0
10190.5
10197.0
10203.0
10225.5
10229.0
10229.5
10230.5
10266.0
10268.5
10272.5
10300.5
10313.0
10323.0
10327.5
10334.5
10345.0
STATIC BASELINE PASS.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY.
/ ? ?MATCH1B. OUT
$
CN : Bx EXPLORATION
WN : Y - 11
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE~ 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
15 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH PDK 68 1 GAPI 4
2 BIF PDK 68 1 4
3 BKL PDK 68 1 CPS 4
4 BKS PDK 68 1 CPS 4
5 CSLS PDK 68 1 CU 4
6 LS PDK 68 1 CPS 4
7 MSD PDK 68 1 CU 4
8 RATO PDK 68 1 4
9 RBOR PDK 68 1 4
10 RICS PDK 68 1 4
11 RIN PDK 68 1 4
12 SGMA PDK 68 1 CU 4
13 SGMB PDK 68 1 CU 4
14 SS PDK 68 1 CPS 4
15 SGNT PDK 68 1 CU 4
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24
4 00 201 24 1
4 00 201 24 1
4 00 201 24
4 00 201 24 1
4 00 201 24 1
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
6O
* DATA RECORD (TYPE~ 0) 966 BYTES *
Total Data Records: 102
Tape File Start Depth = 10345.000000
Tape File End Depth = 9585.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 24337 datums
Tape Subfile: 2 413 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 3
is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH STOP DEPTH
9588.0 10318.0
9600.0 10330.0
BASELINE DEPTH
9595.5
9605.0
9657.5 9657.5
9659.5
9660.0
9661.0
9662.5 9662.5
9663.5 9663.0
9667.5
9668.5
9669.0
9669.5
9671.0
9671.5
9673.5 9673.0
9676.5
9677.5 9678.0
9678.5
9679.0
9687.5
9688.0
9688.5
9689.5 9690.0
9690.0
9692.5
9697.0
9697.5 9698.5
9698.0
9698.5 9699.5
9699.5 9700.0
9702.0 9702.5
9703.5 9704.5
9704.5
9706.5
9710.5 9711.0
9716.5
9718.5
(MEASURED DEPTH)
......... EQUIVALENT UNSHIFTED DEPTH .........
GRCH SGMA
9594.5
9604.0
9659.5
9660.0
9660.5
9667.0
9667.5
9668.0
9669.0
9671.0
9671.5
9677.0
9678.0
9678.5
9679.5
9688.0
9689.0
9689.5
9691.5
9694.0
9698.0
9698.5
9705.0
9707.5
9711.5
9716.0
9718.0
9719.5
9721.0
9721.5
9722.5
9724.0
9735.0
9735.5
9736.0
9741.0
9742.0
9745.5
9746.5
9747.5
9748.5
9752.0
9752.5
9754.0
9764.0
9773.5
9780.0
9784.5
9813.5
9826.5
9829.5
9853.5
9869.5
9880.5
9883.5
9887 · 5
9888.0
9888.5
9892.5
9893.5
9894.5
9901.0
9902.0
9906.5
9907.0
9914.5
9917.5
9924.0
9928.0
9929.0
9946.0
9953.5
9957.5
9958.0
9960.5
9964.0
9969.0
9972.5
9975.5
9981.5
9982.5
10001.5
10005.0
10012.0
10012.5
10013.0
10136.0
9735.5
9736.0
9750.0
9751.0
9762.5
9773.5
9829.5
9854.0
9881.0
9890.0
9896.0
9902.0
9903.0
9907.0
9928.5
9955.0
9959.5
9973.0
9718.5
9720.0
9721.5
9722.5
9724.5
9736.0
9741.0
9741.5
9745.0
9745.5
9746.5
9747.0
9751.0
9751.5
9761.5
9781.0
9784.5
9813.5
9827.0
9870.0
9884.5
9888.5
9889.5
9894.0
9894.5
9908.0
9915.0
9918.0
9924.0
9929.0~
9948.0
9959.5
9962.0
9965.5
9970.0
9973.5
9976.0
9982.0
9983.5
10002.5
10005.5
10012.5
10013.0
10013.5
10136.5
10138.5
10139.5
10140.5
10177.5
10178.0
10186.0
10196.0
10197.5
10199.0
10200.5
10208.5
10209.5
10211.0
10218.5
10229.0
10265.5
10267.0
10278.5
10279.5
10280.0
10280.5
10294.0
10294.5
10295.0
10297.5
10320.0
10320.5
$
REMARKS:
10141.0
10187.0
10197.0
10202.0
10210.0
10210.5
10212.0
10220.0
10230.5
10266.5
10268.0
10294.5
10295.0
10295.5
10138.5
10139.5
10178.0
10179.0
10198.5
10200.5
10280.0
10280.5
10281.0
10282.0
10299.0
10323.0
10323.5
50 BBLS BORAX AWAY PASS.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/ ? ?MATCH2A. OUT
/??MATCH2B. OUT
$
CN : BP EXPLORATION
WN : Y - 11
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
14 Curves:
Name Tool Code Samples Units
GRCH PDK 68 1 GAPI
BIF PDK 68 1
BKL PDK 68 1 CPS
BKS PDK 68 1 CPS
CSLS PDK 68 1 CU
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 00 201 24
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
6 LS PDK ('8 I CPS
7 MSD PDK 68 i CU
8 RATO PDK 68 1
9 RBOR PDK 68 1
10 RICS PDK 68 1
11 RIN PDK 68 1
12 SGMA PDK 68 i CU
13 SGMB PDK 68 I CU
14 SS PDK 68 I CPS
* DATA RECORD (TYPE~ 0)
Total Data Records: 96
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
56
966 BYTES *
Tape File Start Depth = 10345.000000
Tape File End Depth = 9585.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
22816 datums
Tape Subfile: 3
254 records...
Minimum record length:
Maximum record length:
62 bytes
966 bytes
Tape Subfile 4 is type:
LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH STOP DEPTH
9588.0 10318.0
9600.0 10330.0
(MEASURED DEPTH)
......... EQUIVALENT UNSHIFTED DEPTH .........
BASELINE DEPTH GRCH SGMA
9585.0 9585.0
9595.5
9605.0
9617.5 9617.0
9632.0 9632.0
9642.0 9641.0
9645.5 9644.5
9649.5 9649.0
9658.5 9658.5
9659.0
9660.0
9661.0
9662.0 9662.0
9663.0 9662.5
9664.5
9665.0
9668.0 9667.5
9676.5
9677.0 9677.5
9677.5
9678.5
9687.0 9687.5
9688.5
9689.0 9689.5
9690.5
9692.0
9697.0
9697.5 9698.5
9698.5
9700.0 9701.0
9701.0 9701.5
9702.5 9703.0
9704.5
9707.0
9710.5
9711.0 9711.0
9718.5
9594.5
9604.0
9658.5
9659.5
9660.0
9663.5
9664.5
9676.0
9678'0
9678.5
9679.0
9689.0
9692.0
9693.5
9697.5
9698.0
9698.5
9704.5
9707.5
9711.0
9717.5
9719.0
9720.0
9721.0
9721.5
9722.0
9723.5
9724.5
9735.0
9736.0
9741.0
9742.0
9742.5
9743.0
9746.5
9749.0
9752.5
9753.0
9755.0
9756.0
9764.0
9767.5
9770.0
9772.0
9774.5
9780.5
9781.5
9782.0
9783.0
9784.0
9790.0
9796.0
9807.0
9812.5
9814.0
9820.0
9826.5
9832.5
9840.0
9845.0
9849.5
9854.0
9855.0
9859.0
9870.5
9880.5
9883.0
9887.5
9888.0
9894.5
9895.0
9899.5
9901.5
9902.5
9908.5
9910.5
9912.5
9913.0
9913.5
9917.5
9918.5
9723.5
9735.0
9735.5
9741.5
9750.5
9753.0
9762.0
9770.0
9772.0
9774.0
9780.5
9781.0
9782.0
9783.0
9783.5
9789.5
9796.0
9806.5
9814.0
9819.5
9832.5
9839.5
9849.0
9853.5
9855.0
9859.0
9871.0
9880.5
9883.0
9889.0
9896.0
9902.5
9903.0
9909.0
9913.0
9914.0
9918.0
9718.0
9718.5
9719.5
9721.0
9721.5
9724.5
9741.0
9741.5
9742.0
9743.0
9746.5
9747.0
9751.0
9753.5
9761.5
9767.5
9812.5
9827.0
9833.0
9845.0
9888.5
9895.5
9900.0
9911.0
9913.5
9917.5
9918.0
9925.5
9930.5
9931.0
9932.5
9937.0
9947.0
9951.5
9954.0
9957.5
9958.0
9958.5
9962.5
9969.0
9975.0
9978.5
9980.5
9981.0
9987.0
10014.5
10015.5
10016.0
10016.5
10017.0
10050.0
10104.0
10104.5
10106.5
10111.0
10112.0
10114.5
10121.0
10121.5
10122.5
10123.5
10124.0
10136.0
10140.0
10164.0
10177.5
10178.0
10183.0
10186.5
10188.0
10198.0
10199.0
10199.5
10200.5
10201.0
10201.5
10204.0
10205.0
10207.0
10208.0
10208.5
10209.0
10211.0
10218.5
10224.0
10229.0
10244.5
(926.0
9937.5
9948.5
9955.0
9959.0
9975.0
9978.5
9987.0
10050.5
10106.5
10114.5
10121.0
10122.0
10123.0
10123.5
10124.0
10136.5
10141.0
10164.5
10183.5
10187.0
10189.0
10208.0
10208.5
10211.5
10219.5
10225.0
10230.0
9930.0
9931.0
9932.5
9949.0
9953.0
9959.0
9959.5
9963.5
9969.0
9980.5
9981.5
10015.0
10015.5
10016.0
10016.5
10017.0
10104.0
10105.0
10111.5
10112.0
10177.5
10178.5
10198.5
10200.0
10200.5
10201.0
10201.5
10202.5
10205.0
10205.5
10209.0
10210.0
10230.0
10245.0
10245.0
10245.5
10247.5
10248.5
10249.5
10260.5
10265.5
10266.0
10270.0
10280.5
10292.5
10293.0
10293.5
10294.0
10297.0
10297.5
10299.0
10345.0
$
REMARKS:
10266.5
10270.5
10293.0
10293.5
10294.0
10299.0
10345.0
10245.5
10246.5
10248.5
10249.0
10250.0
10261.5
10266.0
10281.0
10293.5
10298.0
10298.5
150 BBLS BORAX AWAY PASS.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/??MATCH3A. OUT
/ ? ?MATCH3 B. OUT
$
CN : BP EXPLORATION
WN : Y - 11
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
14 Curves:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
GRCH PDK 68 1 GAPI 4
BIF PDK 68 1 4
BKL PDK 68 1 CPS 4
BKS PDK 68 1 CPS 4
CSLS PDK 68 1 CU 4
LS PDK 68 1 CPS 4
MSD PDK 68 1 CU 4
RATO PDK 68 1 4
RBOR PDK 68 1 4
RIC$ PDK 68 1 4
RIN PDK 68 1 4
SGMA PDK 68 1 CU 4
SGMB PDK 68 1 CU 4
SS PDK 68 1 CPS 4
4 00 201 24
4 00 201 24 1
4 00 201 24
4 00 201 24
4 00 201 24
4 00 201 24 1
4 00 201 24
4 00 201 24 1
4 00 201 24
4 00 201 24
4 00 201 24 1
4 00 201 24
4 00 201 24
4 00 201 24 1
* DATA RECORD (TYPE# 0)
Total Data Records: 96
966 BYTES *
Tape File Start Depth = 10345.000000
Tape File End Depth = 9585.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
47153 datums
Tape Subfile: 4
305 records...
Minimum record length:
Maximum record length:
62 bytes
966 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 4
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
PDK
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH STOP DEPTH
9588.0 10318.0
9600.0 10330.0
BASELINE DEPTH
9585.0
9590.5
9595.5
9599.0
9605.0
9612.0
9613.0
9617.5
9620.5
9632.0
9645.0
9650.5
9657.0
9658.5
9659.0
9660.0
9661.0
9661.5
9668.0
9672.0
9673.0
9677.0
9677.5
9678.5
9683.5
9687.0
9687.5
9688.0
9689.0
9690.5
9691.0
9692.0
9693.5
9696.5
9697.5
9701.5
9704.0
(MEASURED DEPTH)
......... EQUIVALENT UNSHIFTED DEPTH .........
GRCH SGMA
9585.0 9585.0
9590.0
9594.5
9598.5
9604.0
9611.5
9612.5
9617.0
9620.0
9632.5
9645.0
9650.5
9656.5
9659.0
9659.5
9660.0
9660.5
9661.5
9668.0
9672.0
9673.0
9678.0
9678.5 9678.0
9679.0
9684.0
9688.0 9687.5
9688.5
9689.0
9690.5
9692.0
9693.0
9693.5
9695.0
9698.0
9698.0
9701.5
9704.5
9708.0
9710.5
9711.0
9717.0
9718.5
9719.5
9720.0
9721.0
9721.5
9722.5
9723.5
9724.0
9727.0
9734.5
9736.0
9741.0
9745.0
9746.5
9747.0
9748.0
9752.5
9754.0
9755.0
9757.5
9759.0
9761.0
9763.5
9764.0
9767.5
9769.0
9770.0
9773.5
9774.5
9779.5
9780.5
9783.5
9784.0
9784.5
9785.5
9786.5
9792.0
9792.5
9796.5
9803.5
9814.0
9827.0
9827.5
9828.5
9832.0
9832.5
9834.5
9836.5
9837.5
9838.5
9843.5
9849,5
9853.5
9859.5
9863.5
9875.0
9711.5
9724.0
9735.0
9751.0
9756.0
9762.5
9770.0
9774.5
9779.5
9781.0
9784.5
9786.0
9792.5
9803.5
9814.0
9828.5
9832.5
9834.5
9837.0
9849.5
9859.5
9875.0
9709.0
9711.5
9716.0
9718.0
9718.5
9719 · 5
9720.5
9721.5
9722.5
9724.5
9727.5
9736.5
9741.0
9745.0
9745.5
9746.0
9746.5
9752.0
9753.5
9756.5
9759.0
9761.0
9762.0
9768.0
9769.5
9770.0
9773.5
9784.0
9785.0
9786.5
9792.5
9796.5
9827.0
9828.0
9833.0
9837.5
9838.5
9843.5
9854.0
9859.5
9864.0
9874.5
9880.5
9883.0
9888.0
9888.5
9889.5
9890.5
9894.5
9899.0
9900.0
9904.5
9906.0
9909.5
9913.5
9914.5
9921.0
9923.5
9937.5
9945.0
9947.5
9953.5
9958.0
9958.5
9960.0
9962.5
9968.0
9969.5
9975.5
9980.0
9980.5
9987.5
9989.0
9998.5
9999.0
10000.5
10003.5
10006.0
10021.5
10050.5
10081.5
10095.5
10096.0
10096.5
10097.0
10099.0
10099.5
10108.5
10109.5
10114.0
10114.5
10118.0
10123.5
10124.5
10125.5
10126.5
10127.5
10136.0
10177.5
10178.0
10183.0
10183.5
~880.5
9889.0
9890.0
9891.0
9891.5
9895.5
9900.5
9906.5
9909.5
9923.5
9936.5
9949.5
9955.0
9968.0
9975.5
9987.5
10050.5
10082.0
10099.0
10109.5
10114.0
10118.0
10136.0
10183.5
9883.5
9890.5
9900.0
9900.5
9905.0
9913.5
9914.0
9921.0
9923.0
9946.5
9949.5
9955.5
9959.5
9960.0
9961.0
9963.5
9969.5
9975.5
9980.0
9981.0
9990.0
9999.0
10000.0
10001.5
10004.0
10006.5
10022.0
10096.0
10096.5
10097.0
10097.5
10099.5
10108.5
10114.5
10118.0
10123.5
10124.0
10125.5
10126.5
10127.0
10177.0
10178.0
10183.5
10192.0
10196.0
10198.0
10199.0
1O202.0
10224.0
10228.5
10229.5
10248.5
10249.0
10261.5
10271.5
10296.5
10297.0
10308.5
10316.0
10328.0
10345.0
REMARKS:
10196.0
10202.5
10224.5
10229.0
10229.5
10261.5
10271.0
10316.0
10192.0
10198.0
10199.5
10224.5
10229.0
10229.5
10248.5
10249.5
10261.5
10271.5
10296.5
10297.0
10308.5
10327.5
10345.0 10345.0
300 BBLS BORAX AWAY FLUSH PASS.
ALL PDK CURVES WERE SHIFTED WITH SGMA.
/ ? ?MATCH4A. OUT
/ ? ?MATCH4B. OUT
$
CN : BP EXPLORATION
WN : Y - 11
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
14 Curves:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Name Tool Code Samples Units
GRCH PDK 68 1 GAPI
BIF PDK 68 1
BKL PDK 68 1 CPS
BKS PDK 68 1 CPS
CSLS PDK 68 1 CU
LS PDK 68 1 CPS
MSD PDK 68 1 CU
RATO PDK 68 1
RBOR PDK 68 1
RICS PDK 68 1
RIN PDK 68 1
SGMA PDK 68 I CU
SGMB PDK 68 i CU
SS PDK 68 i CPS
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 1
4 00 201 24 i
* DATA RECORD (TYPE# 0)
Total Data Records: 96
966 BYTES *
Tape File Start Depth = 10345.000000
Tape File End Depth = 9585.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
45632 datums
Tape Subfile: 5
305 records...
Minimum record length:
Maximum record length:
62 bytes
966 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW CURVES
Curves an4 log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9582.0
PDK 9594.0
$
LOG HEADER DATA
STOP DEPTH
10342.0
10354.0
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PDK PDK-100
CCL CASING COLLAR LOC.
TEMP TEMPERATURE
$
BOREHOLEAND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
27-DEC-93
FSYS REV. J001 VER. 1.1
1152 27-DEC-93
10425.0
10354.0
9600.0
10330.0
1500.0
YES
TOOL NUMBER
2725XA
2324NA
2120XA
0.000
10472.0
0.0
PROD. FLUIDS / BORAX
0.00
0.0
227.0
0
0.0
0.000
0.000
0.000
0.0
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT): 0.0
BASE NORMAL ~NG WINDOW (FT):
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 1000
FAR COUNT RATE HIGH SCALE (CPS): 3500
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 60000
TOOL STANDOFF (IN):
0.0
REMARKS:
STATIC BASELINE PASS.
$
CN : BP EXPLORATION
WN : Y - 11
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
20 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
i GR PDK 68 1 GAPI 4 4 06 511 09 0
2 BIF PDK 68 I 4 4 00 201 24 1
3 BKL PDK 68 1 CPS 4 4 39 705 61 6
4 BKS PDK 68 1 CPS 4 4 74 169 61 6
5 CCL PDK 68 1 4 4 92 630 79 6
6 CSLS PDK 68 1 CU 4 4 00 201 24
7 CSS PDK 68 1 CPS 4 4 00 201 24 1
8 ISS PDK 68 1 CPS 4 4 00 201 24
9 LS PDK 68 1 CPS 4 4 71 162 89 6
10 MON PDK 68 1 CPS 4 4 32 125 68 0
11 MSD PDK 68 i CU 4 4 00 201 24 1
12 RATO PDK 68 1 4 4 23 260 40 0
13 RBOR PDK 68 1 4 4 23 260 40 0
14 RICS PDK 68 1 4 4 23 260 40 0
15 RIN PDK 68 1 4 4 23 260 40 0
16 SGMA PDK 68 1 CU 4 4 96 761 61 6
17 SGMB PDK 68 1 CU 4 4 00 201 24 1
18 SPD PDK 68 1 F/MN 4 4 52 386 28 5
19 SS PDK 68 1 CPS 4 4 05 626 89 6
20 SGNT PDK 68 1 CU 4 4 00 201 24 1
8O
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records~ 254
Tape File Start Depth = 10342.000000
Tape File End D~ch = 9582.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 111015 datums
Tape Subfile: 6 329 records...
Minimum record length: 44 bytes
Maximum record length: 1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9586.0
PDK 9598.0
$
LOG HEADER DATA
STOP DEPTH
10324.0
10336.0
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (PT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PDK PDK-100
CCL CASING COLLAR LOC.
TEMP TEMPERATURE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
27-DEC-93
FSYS REV. J001 VER. 1.1
1355 27-DEC-93
10425.0
10354.0
9600.0
10330.0
1500.0
YES
TOOL NUMBER
2725XA
2324NA
2120XA
0.000
10472.0
0.0
PROD. FLUIDS / BORAX
0.00
0.0
227.0
0
0.0
0.000
0.000
0.000
0.0
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT): 0.0
BASE NORMAL ~iNG WINDOW (FT):
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 1000
FAR COUNT RATE HIGH SCALE (CPS): 3500
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 60000
TOOL STANDOFF (IN):
0.0
R~S:
50 BBLS BORAX AWAY PASS.
$
CN : BP EXPLORATION
WN : Y - 11
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
19 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
I GR PDK 68
2 BIF PDK 68
3 BKL PDK 68
4 BKS PDK 68
5 CCL PDK 68
6 CSLS PDK 68
7 CSS PDK 68
8 ISS PDK 68
9 LS PDK 68
10 MON PDK 68
11 MSD PDK 68
12 RATO PDK 68
13 RBOR PDK 68
14 RICS PDK 68
15 RIN PDK 68
16 SGMA PDK 68
17 SGMB PDK 68
18 SPD PDK 68
19 SS PDK 68
I GAPI
1
1 CPS
1 CPS
1
1 CU
1 CPS
I CPS
1 CPS
1 CPS
i CU
1
1
1
1
i CU
i CU
1 F/MN
1 CPS
4 4 06 511 09 0
4 4 00 201 24 1
4 4 39 705 61 6
4 4 74 169 61 6
4 4 92 630 79 6
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24 1
4 4 71 162 89 6
4 4 32 125 68 0
4 4 00 201 24
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 96 761 61 6
4 4 00 201 24 1
4 4 52 386 28 5
4 4 05 626 89 6
76
* DATA RECORD (TYPE# 0) 966 BYTES *
Total Data Records: 251
Tape File Start Depth
Tape File End Depth
= 10336.000000
= 9586.000000
Tape File Level ~Facing =
0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 105653 datums
Tape Subfile: 7 325 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9584.0
PDK 9596.0
$
LOG HEADER DATA
STOP DEPTH
10329.0
10341.0
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PDK PDK-100
CCL CASING COLLAR LOC.
TEMP TEMPERATURE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN)'.
27-DEC-93
FSYS REV. J001 VER. 1.1
1446 27-DEC-93
10425.0
10354.0
9600.0
10330.0
1500.0
YES
TOOL NUMBER
2725XA
2324NA
2120XA
0.000
10472.0
0.0
PROD. FLUIDS / BORAX
0.00
0.0
227.0
0
0.0
0.000
0.000
0.000
0.0
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
0.0
BASE NORMAL~2xNG WINDOW (FT):
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 1000
FAR COUNT RATE HIGH SCALE (CPS): 3500
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 60000
TOOL STANDOFF (IN):
0.0
REMARKS:
150 BBLS BORAX AWAY PASS.
$
CN : BP EXPLORATION
WN : Y - 11
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
19 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR PDK 68 1 GAPI
2 BIF PDK 68 1
3 BKL PDK 68 1 CPS
4 BKS PDK 68 1 CPS
5 CCL PDK 68 1
6 CSLS PDK 68 1 CU
7 CSS PDK 68 1 CPS
8 ISS PDK 68 1 CPS
9 LS PDK 68 1 CPS
10 MON PDK 68 1 CPS
11 MSD PDK 68 1 CU
12 RATO PDK 68 1
13 RBOR PDK 68 1
14 RICS PDK 68 1
15 RIN PDK 68 1
16 SGMAPDK 68 1 CU
17 SGMB PDK 68 1 CU
18 SPD PDK 68 1 F/MN
19 SS PDK 68 1 CPS
4 4 06 511 09 0
-4 4 00 201 24 1
4 4 39 705 61 6
4 4 74 169 61 6
4 4 92 630 79 6
4 4 00 201 24
4 4 00 201 24
4 4 00 201 24
4 4 71 162 89 6
4 4 32 125 68 0
4 4 00 201 24 1
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 96 761 61 6
4 4 00 201 24 1
4 4 52 386 28 5
4 4 05 626 89 6
76
* DATA RECORD (TYPE# 0) 966 BYTES *
Total Data Records: 253
Tape File Start Depth
Tape File End Depth
= 10341.000000
= 9584.000000
Tape File Level %~acing =
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 171596 datums
Tape Subfile: 8 327 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
0.250000
Tape Subfile 9 is type: LIS
FILE HEADER
FILE NUMBER: 8
RAW CURVES
Curves and log header data for each run in separate files; raw background
pass in last file.
PASS NUMBER: 4
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9581.0
PDK 9593.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PDK PDK-100
CCL CASING COLLAR LOC.
TEMP TEMPERATURE
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
STOP DEPTH
10332.0
10344.0
27-DEC-93
FSYS REV. J001 VER. 1.1
1604 27-DEC-93
10425.0
10354.0
9600.0
10330.0
1500.0
YES
TOOL NUMBER
2725XA
2324NA
2120XA
0.000
10472.0
0.0
PROD. FLUIDS / BORAX
0.00
0.0
227.0
0
0.0
0.000
0.000
0.000
0.0
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
0.0
BASE NORMAL~.NG WINDOW (FT):
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 1000
FAR COUNT RATE HIGH SCALE (CPS): 3500
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 60000
TOOL STANDOFF (IN):
0.0
REMARKS:
300 BBLS BORAX AWAY FLUSH PASS.
$
CN : BP EXPLORATION
WN : Y- 11
FN : PRUDHOE BAY
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPES 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
19 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
i GR PDK 68 1 GAPI
2 BIF PDK 68 1
3 BKL PDK 68 1 CPS
4 BKS PDK 68 1 CPS
5 CCL PDK 68 1
6 CSLS PDK 68 1 CU
7 CSS PDK 68 1 CPS
8 ISS PDK 68 1 CPS
9 LS PDK 68 1 CPS
10 MON PDK 68 1 CPS
11 MSD PDK 68 1 CU
12 RATO PDK 68 1
13 RBOR PDK 68 1
14 RICS PDK 68 1
15 RIN PDK 68 1
16 SGMA PDK 68 1 CU
17 SGMB PDK 68 1 CU
18 SPD PDK 68 1 F/MN
19 SS PDK 68 1 CPS
4 4 06 511 09 0
4 4 00 201 24 1
4 4 39 705 61 6
4 4 74 169 61 6
4 4 92 630 79 6
4 4 00 201 24 1
4 4 00 201 24 1
4 4 00 201 24
4 4 71 162 89 6
4 4 32 125 68 0
4 4 00 201 24 1
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 23 260 40 0
4 4 96 761 61 6
4 4 00 201 24
4 4 52 386 28 5
4 4 05 626 89 6
76
* DATA RECORD (TYPE# 0) 966 BYTES *
Total Data Records: 255
Tape File Start Depth
Tape File End Depth
= 10344.000000
= 9581.000000
Tape File Level ~ acing =
0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 166714 datums
Tape Subfile: 9 329 records...
Minimum record length: 62 bytes
Maximum record length: 966 bytes
Tape Subfile 10 is type: LIS
94/ 1/18
01
**** REEL TRAILER ****
94/ 1/18
01
Tape Subfile: 10 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Tue 18 JAN 94 10:12a
Elapsed execution time = 43.72 seconds.
SYSTEM RETURN CODE = 0
IIIIIl
II
II
i1
I.I
Ii
II
II
II.
I1
II
IIIIII
IIIIII
YY
YY
YY
Y¥
YY
YY
YY
YY
YY
YY
YY
YY
YY
YY
YY
000000 000000 666666
000000 000000 666666
O0 O0 O0 O0 66
00 O0 O0 00 66
00 0000 O0 0000 b6
O0 0000 O0 0000 66
O0 O0 OO O0 O0 O0 66666666
O0 O0 O0 O0 O0 O0 66666666
0000 O0 0000 O0 66
0000 O0 OD(JO O0 66
O0 O0 O0 O0 66
O0 O0 O0 O0 66
00OOO0 000000 666666
000000 000000 666666
6b
66
66
66
:*START* USER PCAL [10707,61241] dOB SttlP SRO.
E'II,E: OS~.H:VERiF~.00~05Z>L10707 61.2411 CREATED:
PRINTED: 16 .-~ -EC 80 23:5~:45
OUEUE SWITCHES: /F'II~EIFDRT /COPIES:I
/SPACING:I /I.,IMIT:124 /FOR~4S:N()~MAb
4939 i)ATL
16-DEC-80
Ih-DEC-80
2]:51:52
2_]: 54: 09
SHIP
~ld £PP1NG INS?RUCTIONS
ISSUED 16-D1~;C-80 08:41
BY ~h~ PCCC
***** PCCC
WEI, L $I. TE
C[),'4PAN
WELL:
TfIWN:
SECT] ON
C{)UNT~
STATE:
I NI~' [.IRM AT
I 82 BY. TE$
RECORD
SOHIO AbASKA PETRO.
~-11 RD.
PRUDH(]E BAY
13E
11~
33
N. SLOPE
ALASKA
C{] o
DATA E'URMAT SP~CIFICATIt)N
L..,NGI~H: 650 B~T~S
ENTRY BLOCF, S:
0
SIZE
1
REP CODE
66
ENTR~
0
'StlMMAiq¥ ElF DATA ~ECURD$
NUMBEF~ (DF' RECUR. DS: "/35
I, ENGTId OF I~ECORDS~ 9~.b BYTES
I,ENGTH UF LAST RECORD: 582 BY'lES
t-ILL TRAiLE~
I,ENGTH: 62 B~/'ITES
t, ,tI, g NAME: EDiT .001
MAX!~'iUM PHYSICAL ~ECORD LENGTH;
1024 BYTES
'CAPE TI:~.A I L EP.
LENGTH: 1.~2 BYTES
TAPE NA~tE: 61241 DATE: 80/!2/IO
SF;RV ICE NAME: EDIT
TAPE CfII\ITINUATION NUMBEbt: 0!
NEXT TAPE NA~E:
CO~iHENTS: UNIQUE WEbh IDENTIFICATION NUNBER IS 50-029-20513
SCHbU~--'IBERGER CO~.PUTI.NG CENTER
10707,61241
RLEL HEADER
LENGIH: 1.]2 BYTES
REEL NANE: P.C.A.L,
SERVICE NAME: EDIT
REEL CONTiNUATIt]N NUMBER: O1
PIIEVIOUS REEL NAME:
CflMMENTS: LIS FORMAT CUSTOME~
TAPE
DATE: 80/12/16
TAPE }JEADER
LENGTH: 1 ~,2 B%'TES
TAPE NAME: 61241
SgRVlCE hANg: EDIT
TAPE CUNTINUATIUN NU,~iBER: 01
PREVIOUS TAPE NAME:
CI']MMENTS: []N.IOUE WELL IDENTI~-ICAT1ON
TAPE COMMENTS
DIL RUN ~ 2, LOGGED 7-DEC-80
DATE: 80/12/1~
NUMBER
CASING DRILLER : 9.625 IN. ~. 95134 FT.
BIT SIZE : 8.500 IN.
FI, I!ID IN THE HOLE : PflLYME;R-GgL
I)EN6 : 10.0
v.ISC - 40,00
PH : 10.5
F I.,tJ ID LOSS : 5.5 MI.,
RM ~ MEAS TEMP. = 1.87 ~ 67 ~
R~qF " " = 1.45 ~ 67 F
R~C " " = X.XX ~ XX F
RM ~ ~HT : 0.67 ~ !86 F
IS 50-029-20513
FII;E tiEADER
I, ENGTH: 62 BYTES
FILE NAME: EDiT .001
MAXIMUM PHYSICAL RECORD LENGTH:
PREViUU8 FILE NAME:
FILE COMMENTS
DII~ GR ~ BBC GR F"R(3~I SA~E DATA
1024 BYTES
BELOW 9~52 FT.
DATI}M SPECIF
ENTRY IC TUOL
BLOC I,: 5:
$ V U R I) !!
UNIT8
FT
MV
OHMt~
Oi-i~4M
GAPI
GAP[
G/C ]
PO
G/C3
C/C
CPS
CPS
GAPI
US/F
AP1
API
APl
AP
0 0 O 0 0
7 1 0 0 0
7 12 46 O O
? 12 44 0 0
? 22 1 0 0
7 31 32 0 O
42 31 32 0 0
42 28 1 0 0
42 44 0 0 0
42 68 2 0 0
42 35 I 0 0
42 42 1 O 0
42 34 92 0 0
42 34 93 0 0
60 31 32 o 0
60 52 32 O 0
SIZE EXP
PROC
SAM
4 0 0
4 0 0
4 0 0 1
4 0 0
4 0 0
4 0 0 1
4 0 0 1
4 0 0 1
4 0 0 1
4 0 0 1
4 0 0
4 0 0 1
~ 0 0 1
4 0 0 1
4 0 0 1
4 0 0
REP DEPT SHIF.[
68 0 0
68 0 0
58 0 0
08 0 0
~8 0 0
b8 0 0
68 0 0
68 0 0
68 0 0
~8 0 0
O8 0 0
o 8 0 0
68 0 0
b8 0 0
t~8 0 0
68 0 0
I:,F q. H
1049o. 000
i0400.000
10 300. O00
1020O,OOO
10100.000
10000.000
9900.000
980O. OO0
9700.000
9600.000
9500,000
MN
kM/JNIC
SP
GR
NPHi
FCNL
SP
GR
NPH I
FCNb
SP
GR
NPBi
FCNL
SP
GR
NPHI
FCNL
SP
GR
NPHI
FC N 1.,
SP
GR
NPHI
FCNL
$P
NPHI
SP
GR
NPHi
~CNL
SP
GR
FCNL
5P
GR
NPHi
FCNb
SP
GR
NPHi
FCNL
VALUE
-44.906
87,50O
30.908
810.000
-46.625
89,875
18,750
1503.000
-78.625
33,281
13 818
2210:000
-42.875
85,188
18,408
1106.000
-97.87
24,56~
17.139
1653.000
-94.875
26.516
11.377
2294.000
-9].375
30,016
16,992
1702.000
-1.00,438
22.750
18,115
1417.000
-44.375
66.000
5.762
3034.000
-41.156
103,688
35,059
441.75o
-!3,953
56.406
-999,250
0.000
MNEMONIC
GR
RH DB
GR
Ii, D
GR
RHOB
GR
ILO
GR
RH(JB
GR
ILD
GR
RHOB
GR
ILO
GR
GR
ILD
GR
RH[]B
GR
ILO
GR
RHQB
GR
1LO
GR
RHOB
GR
I L D
GR
RH(JB
GR
ILD
GR
RHO~
Git
1LO
GR
RHUB
GR
VALIJE
5,113
107.188
2,625
87.500
6,180
95 250
2:705
89,875
5,664
39. 156
2,547
33,7.81
5.242
92.188
2,648
85,188
2.135
30.016
2 385
24:563
5.063
30.813
2.494
26,516
3.943
32.000
2.430
]0.016
15.922
27,359
2.436
22,750
20
77;375
2.658
66.000
1.495
108.188
2.4O4
103,688
1,275
O.000
-999,250
0.000
MNkM(JN 1C
IbM
CALl
NRAT
DT
ILM
CALl
DT
1LM
CALl
NRAT
DT
CALl
NRAT
DT
ibm
CALl
NRAT
DT
ILM
CALl
NRAT
DT
IbM
CALl
NRAT
DT
ILM
CAbI
NRAT
DT
CALl
NRAT
DT
iLM
CALl
NRAT
DT
iLM
CALl
DT
VALUe%
3.70]
7.281
2.990
80.375
6,594
8,742
2.289
76,188
0.762
8.586
1,943
71.375
5,285
9,20]
2.303
74,188
2.59O
8,5]9
2.162
81.188
5,883
8,492
1.771
72,750
4,902
8.523
2.152
81.563
13,141
8,414
2,217
81.375
21.422
9.148
1.446
63.188
1.461
12.477
3.574
98,1.88
1.301
0.000
0.000
-999.250
MNEMONIC
SFLU
ORHO
NCNb
SFLU
DRHU
NCNb
,SFLO
DRHO
NCNb
$FUU
DRHO
NCNL
DRHO
NCNb
SFLU
DRHU
NCNb
SFLU
DRHO
NCNb
SFLU
ORHO
NCNb
5FLU
DRHO
NCNb
SFLU
DRHO
NCNb
SFbU
ORHO
NCNb
VALU~
0.219
2632,000
6.887
0,144
]534.000
12.016
0.065
4644,000
7.746
0,10]
2764,000
5.434
0.004
4070.000
12.336
0.0'19
4484.000
10,52]
0.059
]982,000
17.281
O.Obl
3632.00o
39,025
0,016
4792,000
1.916
0.109
1713.000
1,724
0.000
0,000
D ~; P T H
9400. 000
9300. 000
9200.000
91. O0. 000
900O.000
8900.000
8800.000
8700.000
8600.000
8500.000
8 ,~00. 000
SP
GR
NPH I
FCNL
GR
NPHI
FCN L
SP
GR
NPHI
FCN L
SP
G~
NPRI
FCNL
5P
GR
NPHI
FCNL
GR
NPHI
FCNL
SP
G~
NPHi
FCNL
SP
GR
NPHI
FCNL
SP
GR
NPHI
FCNL
SP
GR
NPHI
FCNL
5P
FCNL
VALUE
-13.406
10~.500
-999.250
0.000
-1.7.000
86.375
-999.250
0.000
-14.484
96.000
-999.250
0.00o
-17.391
98.000
-999.250
0.000
-19.688
11i.250
-999.250
0.000
-29.250
82.375
-999.250
0.000
-28.953
90.56]
-999.250
O.O00
-26.141
97.500
-999.250
0.000
-27.500
95.188
-999.250
0.000
-]0.938
95.125
-999.250
0.000
-30.21q
108.250
-999.250
0.000
MN
EMON .lC
l L D
GR
GR
1 LD
RH(]B
GR
ILD
RHOB
GR
ILD
GR
1Lb
GR
lI~P
GR
GR
ILD
GR
GR
I I.,D
GR
RHUB
GR
1LO
GR
l.~}iOB
GR
1Lb
GR
RHOB
GR
ILO
GR
RitUB
G~
1.350
0.000
-999.250
0.000
2.20l
0.000
-999.250
0.000
1.160
0.000
-999,250
0.000
1. _~t 56
0 000
-999~250
0.000
1.173
0.000
-999.250
0.000
2.631
0.000
-99q.250
0.000
1.207
0.000
-999.250
0.000
1.~32
0.000
-999.250
o. 000
0.992
0.000
-999.250
0.000
1.166
0.000
-999.250
0.000
0.907
0.000
-999,250
0.000
MN
IbM
CALl
NRAT
DT
IbM
CALl
NRAT
DT
1bM
CAb I
NRAT
DT
ILM
CALl
NRAT
DT
IbM
CALl
NRAT
DT
iLM
CALl
NRAT
OT
IbM
CALl
NRAT
DT
ibm
CALl
NRAT
DT
II,a
CALl
NRAT
DT
IbM
CALl
NRAT
DT
ibm
CALl
N RAT
DT
VAb
1
0
0
-999
2
0
0
-999
1
0
0
-999
1
0
0
-999
1
0
-999
2
0
0
-999
1
0
0
-999
1
0
0
-999
1
0
0
-999
1
0
0
-999
0
0
0
-999
UE
.442
.000
.000
.250
.]]4
.000
.000
.250
.302
.000
.000
.250
.396
.000
.000
.250
.269
.000
.000
.250
.000
.000
.250
.]]4
.000
.000
.250
.393
.000
.000
.250
.054
.000
.000
.250
.230
.000
.000
.250
.977
.000
,000
.250
MNEMt]I~ lC
SFbU
DRHO
NCNb
SFbO
DRHO
NCNb
SFGU
DRHU
NCNb
SFLU
DRHU
NCNb
SFLU
DRHO
NCNb
SFLU
DRHO
NCNb
SFbU
DRHO
NCNb
SFhU
DRHU
NCNb
SFLO
DRHO
NCNb
SFLU
DRHO
NCNL
SFbO
ORHO
NCNb
VAbUE
2.002
0.000
0.000
2.625
0.000
0.000
1.O~1
0.000
0.000
1.75~
0.000
0.000
1.581
0.000
0.000
2.760
0.000
0.000
1.~54
0.000
0.000
1.603
0.000
0.000
1.08]
0.000
O.OOO
1.460
0.000
0.000
1.19.]
0.000
0.000
DE, PTH
8300.000
8200. 000
alO0.O00
8000. 000
7900.000
7aO0.O00
7700·000
7600·000
7500.000
7400.000
7 ~,00. 000
MNEM(INI. C
SP
GR
NPHI
FCNL
SP
G~
NPHt
~CNb
SP
NPHI
FCN£,
SP
GR
NPHI
~CNL
8P
FCNL
SP
GR
NPHI
FCNL
SP
GR
NPHI
~CNL
SP
GR
NPHI
FCNL
SP
GR
NPHI
FCNL
8P
GR
NPHI
tip
GR
NPHi
VAL
-28
184
-999
0
-33
201
-999
0
128
-999
0
-42
164
-999
0
-28
190
-999
0
-29
149
-999
0
-26
74
-999
0
-29
106
-999
0
-29
95
-999
0
-999
0
-26
95
-999
0
UE
.500
.875
.250
.OOO
.469
.250
.250
.000
.000
.750
.250
.000
.2lq
.000
.250
.000
.00O
.75O
.250
.000
.750
.500
.250
.000
.750
.938
.250
· 000
.20]
.188
.250
.000
.172
.56~
250
:000
.438
.188
.250
.000
.719
.063
.250
.000
MN
EMON lC
ILD
GR
RIiUB
GR
ILD
GR
RHOB
GR
ILL
GR
RHUB
GR
1 LD
GR
RHOB
GR
1 LD
GR
R}tUB
GR
Ii,D
GR
R ti 0 B
GR
ILD
GR
GR
RHOB
GR
R.HOB
GR
ILD
GR
~HOB
GR
ILO
GR
G?
VALUE
1.433
0.000
-999.250
0.000
2.432
0.000
-999.250
0.000
2.535
0.000
-999.250
0.000
2.422
0.000
-999.250
0.000
2.O14
0.000
-999.250
0.000
1.944
0.000
-999.250
0.000
2.637
0.000
-999.250
0.000
2.012
0 000
-q99:250
0.000
2.137
0.000
-999.250
0.000
2.211
0.000
-99q.250
0.000
2.047
0.000
-999.250
0.000
MNEMONIC
ILM
CALl
NRAT
DT
ILM
CALI
NRAT
DT
CALl
NRAT
DT
ILM
CALl
NRAT
DT
ILM
CALl
DT
CALl
NRAT
DT
iLM
CALl
NRA~
DT
ILM
CALl
NRAT
DT
CALl
NRAT
DT
CALl
NRAT
DT
IL~
CALl
NRAT
DT
VAL
1
0
0
-999
2
0
0
-999
2
0
0
-999
2
0
0
-999
2
0
0
-999
2
0
0
-999
2
0
0
-999
2
0
0
-999
2
0
0
-999
2
0
0
-999
2
0
0
-999
UE
.495
.000
.000
.250
.457
.000
.000
.250
.580
.000
.000
.250
.516
.000
.000
.250
.053
.000
.000
.250
.137
.000
.000
.250
.576
.000
.000
.250
.066
.000
.000
.250
.180
.000
.000
.250
.266
.000
.000
.250
.070
.000
.000
·250
MNEMONIC
SFbU
DRHO
NCNb
SFLU
DRHO
NCNb
SFbU
DRHO
NCNB
SFLU
DRHU
NCNL
SFbO
DRHU
NCNb
SFLU
DRHU
NCNB
SFLU
DRHU
NCNb
SFLU
DRHO
NCNb
DRHO
NCNb
SFLU
DRHU
NCNB
$~bU
DRHO
NCNb
VAbUE
2.002
0.000
O.O00
3.338
0.000
0.000
2.110
0.000
0.000
3.42U
0.000
0.000
2.691
0.000
0.000
2.922
0. 000
0.000
2.148
0.000
0.000
2.13]
0.000
0.000
2.117
0.000
0.000
2.146
0.000
0.000
2.049
0.000
0.000
D IL P T H
7200,000
7 ! O0. 000
7O00. 000
6900. 000
6~00.000
6700.000
6600.000
6500.000
6400.000
6 ~iO0. 000
6200,000
MNi/~MUN IC
SP
NPHI
FCNL
SP
NPH I
FCNL
SP
GR
NPHI
FCNL
SP
GR
NPHi
FCNb
SP
GR
NPH I
FCNL
SP
NPH1
FCNL
8P
GR
NPHI
FCNL
SP
GR
NPHI
P'CNL
8P
GR
NPHI
FCNL
SP
GR
N PHI
FCNL
SP
NFtiI
FCNI.,
VALUE
-26.98
95.81
-999.25
0.00
-26.50
85.25
-999.25
0.00
-28.00
78.00
-999.25
0.00
125.81
-999.25
0.00
-27.93
92.43
-999.25
0.00
-26.45
92.68
-q99.25
0.00
-31.23
89.37
-999.25
0.00
-28.71
8j.68
-999.25
0.00
-35.71
75.93
-999.25
0.00
-40.21
72.75
-999.25
0.00
-70.62
~8.87
-999.25
0.00
MN
gMON lC
l LD
GA
RHOB
GR
ILD
GR
RHIJB
GR
1LD
GR
R}igB
GR
ILD
GR
R,HOB
GR
IbD
GR
RHUB
GR
1 LD
GR
RHOB
GR
ILD
GR
GR
I I,D
GR
RHOB
GR
iLD
GR
RHUB
GR
1 L D
GR
RHOB
GR
I laD
GR
GR
VALUE
2.-~18
0.000
-999.250
0.000
3.932
0.000
-999.250
0.000
4.262
0.000
-999.250
0.000
3.176
0.000
-99q.250
0.000
3.314
0.000
-999.250
O.O00
3.959
0.000
-999.250
0.000
4.109
0.000
-999.250
0.000
2.889
0.000
-99q.250
0.000
4.551
0.000
-999.250
0.000
4.137
0.000
-999.250
0. 000
6,2'1
000
-999:250
.000
MN
EMUN 1C
CALl
NRAT
DT
1LM
CALl
NRAT
DT
ILM
CALl
NRAT
DT
1 LM
CALl
NRAT
D T
iLM
CALl
NRA~
DT
1 LM
CALl
NRAT
DT
ILM
CALl
NRAT
DT
IbM
CALl
DT
ILM
CALl
NRAT
DT
IbM
CALl
NRAT
DT
ILM
CALl
DT
VAL
2
0
0
-999
4
0
0
-999
4
0
0
-999
0
0
-999
3
0
0
-999
.]
0
0
-999
4
0
0
-999
2
0
0
-999
4
0
0
-999
4
0
O
-999
4
0
0
-999
.309
.000
.000
.250
.031
.000
.000
.250
.465
.000
.000
.250
.143
.000
.000
.25O
.350
.000
.000
.250
.8~0
.000
.000
.250
.051
.000
.000
.250
.904
.000
.000
.250
.680
.000
.000
.250
.258
.000
.000
.250
.199
.000
.000
.250
MNEMONIC
iS F !., O
D,qHO
NCNb
SF'LU
DRHU
NCNL
SFLU
DRHU
NCNb
DRHO
NCNb
SFLU
DRHO
NCNb
SFLU
I.)RHU
NCNb
SFLU
DRHO
NCNL
SFLU
DRHO
NC Nb
8FLU
DRHO
NCNb
SFbU
DRHU
NCNb
SFLU
[)RHO
NCNb
VAbU5
2.467
0.000
0.000
4.289
0.000
0.000
4.017
O.O00
0.000
0.000
0.000
3.467
0.000
0.000
5.758
0.000
0.000
3.891
0.000
0.000
2.811
0.000
0.000
3.998
0.000
0.000
930
0.000
0O0
5.734
0.000
0.000
DEPTB
6!00.000
6000. 000
5q00.O00
5800.000
5700.000
5600.OO0
5500.000
5400.000
5 300. 000
5200.000
5100.000
aNEMI.INIC
SP
GR
NP?iI
FCNL
8P
GR
NPHI
FCNL
8P
GR
NPflI
P'CNL
SP
GR
NPHI
PCNL
SP
Gt~
NPHi
I;CNL
SP
GR
NPHI
FCNL
SP
GR
NPH I
FC N I:
SP
GIq
NPHI
FCNL
SP
GR
NPHI
FCNL
8P
GR
NPHI
FCNL
SP
FCNL
V Ab UE
80.125
-999.250
0.000
-43.719
93.625
-999.250
0.000
-57.844
67.688
-999.250
0.000
-90.500
61.81]
-999.250
0.000
-54.625
70.625
-999.250
0.000
-124.375
55.75O
-999.250
0.000
-54.125
67.313
-999.250
0.000
-99.500
48.813
-999.250
0.000
-6~.875
51.844
-999.250
0.000
-84.250
43.156
-999.250
0.000
-57.625
53.563
-999.250
0.000
MNEMON lC
GR
RHOB
GR
IhD
GR
RH[JB
GR
1LD
GR
RHf]B
GR
ILD
GR
[qHOB
GR
ILD
GR
GR
ILD
GR
RHOB
GR
IBD
GR
RHOB
GR
ILD
GR
R HQB
GR
1LD
GR
GR
I
GR
RHF)B
GR
iLD
GR
GR
VAblJE
3.~13
0.000
-999.250
0.000
4.54~
0.000
-999.250
0.000
3 154
0:000
-999.250
0.000
2.137
0.000
-99q.250
0. 000
4.031
0.000
-999.250
0.000
1.486
0.000
-999.250
0.000
3.283
0.000
-999.250
0.000
2.141
0.000
-999.250
0.000
2.551
0.000
-999.250
0.000
2.895
0.000
-999.250
0.000
2.883
0.000
-999.250
0.000
MN
I~MUN IC
CALl
NRAT
DT
IbM
CALl
NRAT
OT
CALl
NRAT
DT
CALl
NRAT
DT
ibm
CALl
NRAT
DT
ILM
CALl
NRAT
DT
ILM
CALI
NRAT
DT
iBM
CALl
NRAT
DT
1LM
CALl
NRAI
DT
ibm
CALl
NRAT
DT
CALl
N~AT
DT
VALUE
3.305
0.000
0.000
-999.250
4.422
0.000
0.000
-999.250
3.279
0.000
0.000
-999.250
2.604
0.000
0.000
-999.250
4.18~
0.000
0.000
-999.250
2.016
0.000
0.000
-999.250
3.629
0.000
0.000
-999.250
2.b13
0.000
0.000
-999.250
2.9,34
0.000
0.000
-999.250
3.650
0.000
0.000
-999.250
3.254
0.000
0,000
-999.250
MNEMONIC
8FLU
DRBL)
NCNb
ORHU
NCNb
SFbU
DRHO
NCNb
SFLU
DRHO
NCNb
SFbU
DRHO
NCNb
$FhU
DRHU
NCNb
SFbU
ORHO
NCNb
SFbU
DRHO
NC Nb
DRHO
NCNb
SFbU
DRHO
NCNb
SFbU
ORHO
NCNb
VAbU~
3.14J
0.000
0.000
4.305
0.000
0.000
4.211
0.000
0.000
7.180
0.000
0.000
5.02]
0.000
0.000
7.156
0.000
0.000
4.052
0. 000
0.000
5.~37
0.000
0.000
4.125
0.000
0.000
5.4]0
0.000
0.000
2.773
0.000
0.000
500O. 000
4987.000
,t,,i N Ebl (] i~ lC
SP
FCNL
SP
GR
NP}i I
YALUE
-52.719
54.81.3
-999.250
0.000
-999.25O
-999.250
-999.250
-999.250
MNEMONIC
iLD
GR
GR
ILD
GR
GR
2.793
0.000
-999.250
0.000
-999.250
-999.250
-999.250
-999.250
b%NENON lC
ILM
CALl
DT
lhM
CALl
NRAT
DT
VALUE
3.260
0.000
0.000
-999.250
-999.250
-999.250
-999.250
-999.250
MNEMUN lC
SFDU
DRHO
NCNL
SFLU
DRHU
NCNb
VALUE
4.016
0.000
0.000
-999.250
-999.250
-999.250