Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-153 EC �/ED STATE OF ALASKA REIY ALASKA OIL AND GAS CONSERVATION COMMISSION FEB 14 2014 WELL COMPLETION RECO , PLETION REPORT AND LO9kOGCC 1 a. Well Status: 0 Oil 0 Gas 0 SPLUG 0 Oth v Abandoned ►A Suspended 1 b. Well Class 20AAC 25.105 '?IiIAAC 25.110 0 Exploratory , ❑Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Othe Vr 1�� •'Ihfo.of Completions Zero ❑ Development ®Service 2. Operator Name: lklti3 1 5. '-te Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP__Exploration(Alaska) Inc. • 1/22/2014 • • 195-153 . 313-580 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 10/6/1995 • 50-029-22603-00-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 10/20/1995 • MPF-70 • 2189'FSL,2591' FEL, Sec.06,T13N, R10E, UM 8. KB(ft above MSL): 48.15' • 15.Field/Pool(s) Top of Productive Horizon: 2645' FSL,2645' FEL, Sec.30,T14N, R10E, UM GL(ft above MSL): 12.1' • Milne Point Unit/Kuparuk River Total Depth: 9.Plug Back Depth(MD+TVD) Oil 2822' FSL,2867' FEL, Sec. 30,T14N, R10E, UM 14582' 7261' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 541970 ' y- 6035642 ' Zone- ASP4 14989' 7622' . ADL 025509&355018 • TPI: x- 541589 y- 6046655 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 541587 y- 6046831 Zone- ASP4 None 18.Directional Surve : 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): Y ❑Yes ®No N/A ft MSL 1800'(Approx.) (Submit electronic and printed information per 20 AAC 25.050) ( PP ) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD, LWD,Gyro, GR/RES/NEU/DEN, GR/CCL/SBT, GR/JB N/A 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM Top BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.1# NT8OLHE 38' 110' 38' 110' 30" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-80 36' - 7085' 36' 4486' 12-1/4" 1380 sx PF'E', 250 sx Class'G',225 sx PF'E', 7" 26# L-80 33' 14969' 33' 7603' 8-1/2" 265 sx Class'G' 24. Open to production or injection? 0 Yes ®No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): - ) 4-1/2", 12.6#, L-80 14248' 14214'/6973' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 8 •WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No SEAMED GW APR Z01 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 14582' Set Whipstock 14587' 22 Bbls Class'G' 14587' 31 Bbls Class'G' 27. __ PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Injection N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes ® No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC RBDMS 250.071.5 None APR 16 10�1$`- Form 10-407 Revised 10/2012 CONTINUED ON REVERSE !/<2) 'i/2,`// Submit Original O y vu4/z3e ¢ z.. _- � 29. GEOLOGIC MARKERS(List all formations an, kers encounter 30. FORMATION TESTS NAME ND Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Kuparuk A 14563' 7246' None Kuparuk A3 14571' 7252' Kuparuk A2 14592' 7269' Kuparuk Al 14621' 7293' Formation at Total Depth: 31.List of Attachment: Summary of Pre-Rig Work, Summary of Daily Drilling Reports,Well Schematic Diagram 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Mel Rixse,564-5620 Email: Mel.Rixse@bp.com Printed Name: Joe Lastu Title: Drilling Technologist Signature: 1 Phone, 564-4091 Date: 2-/14'�1 � �---� INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 MC 25.071. Form 10-407 Revised 10/2012 Submit Original Only • MPF-70, Well History (Pre-Rig Sidetrack) Date Summary 11/29/13 INITIAL T/I/O=500/250/500. STANDBY FOR SCAFFOLD TO GET FIXED. RIH WITH HEAD (ECRD)/ XTRA-B TRACTOR/WPP TOOLS/BAKER 10/WHIPSTOCK. 11/30/13 CONTINUE RIH WITH HEAD(ECRD)/XTRA-B TRACTOR/WPP TOOLS/BAKER 10/BAKER WHIPSTOCK. WHIPSTOCK SET.TOWS SET @ 14582'. ORIENATION=32.1 DEG. FINAL T/I/O= 380/300/500 PSI. 12/13/13 CTU 9 w/1.75"CT. Scope; Mill XN, Sqz cement. MIRU, BOP function tested upon installation, MU 3.80" LH diamond milling BHA(OAL= 17.8'). RIH. Dry tag XN at 14280'CTM. PU to establish freespin. 12/14/13 CTU 9 w/1.75"CT. Scope; Mill XN, Sqz cement. Mill XN nipple at 14276'CTM. Backream and pass through nipple 3 times pumping. Dry drift through nipple, clean. POOH. LD milling BHA(3.77"GO/3.76" NO-GO). MU 2.50" BDJSN Cementing BHA(OAL=9'), Load backside with 335 bbls KCL and 30 bbls 60/40 McOH Cap, RIH,Tag Whipstock at 14552', PU to TOWS and correct depth to 14582', PU 10'and paint flag. Establish baseline WHP of 520 psi at 1 bpm. Pump 22 bbls of 15.8 ppg Class G cement. Squeeze 4 bbls behind pipe and POOH laying in remaining cement. PUH to 13741'. Perform hesitation squeeze. Could not build squeeze pressure.22 bbls of cement placed behind pipe. Over displace cement into perfs by 30 bbls. Open choke, Drop ball. RIH. Clean 7"liner with SL 1% KCL, POOH chasing at 80%. LD BHA. ---LEFT DOWN HOLE: 3/4"steel ball--- 12/15/13 CTU 9 w/1.75"CT. Scope; Mill XN, Sqz cement. Downstack lubricator and injector. Move unit away from well and swap BOPs.Test BOPE. Repair backup BOPE pump system. 12/16/13 CTU 9 w/1.75"CT. Scope; Mill XN, Sqz cement. Repair BOPE backup pump system.Test BOPE. MU 2.5" BDJSN cement BHA. Nipple up BOPs to well. RIH. Bullhead 41 bbls 60/40 McOH down backside. Tag WS, PUH to TOWS at 14552'. Correct depth to 14582'. PUH 10'and flag pipe. Establish baseline WHP at 850 psi. Pump 31 bbls of 15.8 PPG class G cement. Squeeze 0.5 bbls behind pipe. POOH laying in Cement 1:1, Park @ 12778'(above WCTOC)and build squeeze to 1850 psi.Total=2.3 bbls of 15.8 ppg class G cement. RIH contaminating cement with Power-Vis down to setdown at 14438'. Could not jet further. Reciprocate across 7"liner. PUH and attempt to reciprocate across 4.5"tubing, repeated setdown @ 13134'.Abandon cleanout and POOH. Jet tree and BOP stack. FP well from 2500'to surface. 12/22/13 CTU#9 1.75"Coil Objective: Mill Cement. Travel from Deadhorse. MIRU. Drift coil with 1.25"ball. MU BTT LH milling BHA w/3.80"mills. RIH while circulating KCL to motor.Tag at 6815'ctm, PU hole clean. Rih to re-tag at 6855'ctm. PUH to finish displacing coil. Mill ahead to 6900'ctm with no sign of motor work. Puh. Circulate bottoms up. Drop to minimum rate. Rih and tag at 6900'ctm. Mill down to 6915'ctm, No motor work seen. PU hole. Drop rate to minimum. Dry tag at 6915'ctm.Appears we have cement stringers. Powervis arrived. Bring rate up to 2.2 bpm. Mill ahead down to 8000'ctm,with(2)5 bbl gel sweeps circulated to surface. Chase up to 6300'ctm. Once Gel sweep#2 out. Shut pump down for dry tag. Ran right by 8000'ctm. Bring pumps back to .3 bpm while rih. Currently at 11,000'ctm at report time. 12/23/13 CTU#9 1.75"Coil (CV=44.2 bbls)Job Objective: Mill Cement, GR/CCL Log, Underream to whipstock. Continue in hole. Rih at 2.2 bpm circulating Powervis out from 12,000 to 13,000'ctm. Chase out at 80% to 5800'ctm. Start RIH to 13000'ctm. Rih at.2 bpm to 13400'ctm. No tag. Puh. Come offline. Rih dry. Tagged 13414'ctm down. Pump 13 bbl gel pill, chase OOH.Wait for fluids. Repair tractor. Still waiting on fluids. Decision made to finish pulling out of hole and perform weekly BOPE test.At surface. Swab and SSV have ice in body. Install heat on valves. Barrier test passed. Come to back deck. Break down Baker tools. Found trolley winch mis-wrapped. Stack down. Page 1 of 2 MPF-70, Well History (Pre-Rig Sidetrack) Date Summary 12/24/13 CTU#9 1.75"coil(CV=44.2 bbls)Job objective: Mill cement, GR/CCL, Under-ream cement Finish fixing trolley winch. Prepare for weekly BOPE test.Test BOPE. Replace Reel Swivel. Stack up lubricator. MU 3.80" LH milling BHA. RIH for dry tag at 13534'ctm. Mill ahead to 14323'ctm with multiple gel sweeps. No motor work seen. PUH 10'. Flag pipe. Pump 16 bbls gel sweep. Chase out of hole at 80%.At 9907 ctm. Injector hose reel swivel was leaking. Stop pipe. Closed Slip rams. Shut down Power pack. Launch 5/8"steel ball. Opened circ sub. Continue to circulate while waiting on mechanic. 12/25/13 CTU#9 1.75"coil(CV=44.2)Job Objective: Mill Cement, GR/CCL log, Under-ream to whipstock. Currently Circulating waiting on mechanic to replace hydraulic reel swivel for injector. Replaced Hydraulic hose swivel. Pressure tested. Open slip rams. Pooh. Freeze protect coil and well to 3500'ctm. LD milling BHA. Diamond parabolic-3.79"GO/3.78"NO-GO, Diamond String Reamer-3.804"GO/3.79"NO-GO. 5/8"steel ball recovered. MU BTT CTC and MHA. Replace triplex packing. MU PDS GR/CCL in 2-7/8" carrier+ nozzle(MAX OD=3.45'OAL= 17.09'). RIH. Log from 14316 to 13400'CTM with a tie-in flag at 14150.0'elec(14143'mech, 14132.91'uncorr EOP). POOH. 12/26/13 CTU#9 1.75"Coil (CV=44.2 bbls)Job Objective: Mill Cement, GR/CCL, Underream. At surface with PDS GR/CCL logging tools. Bad Data (Battery blew a fuse). Pick up new set of tools Rih to Orange Flag at 14318'ctm. Log up at 40'/min to 14150.2 E 14167'M. Flag pipe(Yellow). Pooh.While freeze protecting well with 38 bbls 60/40. Download data. +29.5'correction to SLB Whipstock setting record dated 29-NOV-2013. Corrected EOP at Yellow flag is 14166.54' ELMD. Stack down to inspect injector while crew changeout. Install night cap. Stack back up. Secure well while rig move blocks access to pad. 12/27/13 Continued from WSR 12-26-13 CTU 9 w/1.75"CT. Scope; Underream. MU BHA; 3.13"ctc,dfcv,3.38" disco, 3.13"circ sub, motor,3.63" DB underreamer w/7"26#knifes,3.78"diamond parabolic mill (oal= 20.64'). Underream from 14408 to 14540. 12/28/13 Continued from WSR 12-27-13 CTU 9 w/1.75"CT. Scope; Underream. Underream from 14540 to target depth of 14567'elmd. (15'off top of whipstock) Back ream, drop ball and open circ sub, pump 22 bbls gel sweep and chase to surface at 80%. Freeze protect to 2500'with 60/40 meth. Break down tools. Underreamer arm wear pattern consistent with being full open.5/8"ball recovered. RDMO. 01/05/14 T/I/O 180/193/300, MIT-T Pumped 2.28 bbls down TBG. 01/06/14 MIT-T @ 2500 psi, PASSED on 3rd attempt. 1st 15 min loss of 19 psi,2nd 15 min loss of 17 psi,total loss of 36 psi, Bled TBG back to zero. FWHP 0/255/300 SV,WV, SSV=Closed, MV, IV, OV=open. Well shut in upon departure. 01/11/14 Set 4"CIW H TWC#MP4-11 /remove SSV/install 2nd manual swab/PT tree/Pull TWC. TWO= 400/250/340 Verified barriers(SV, SSV) Installed lubricator and PT'd to 300 low and 3500 high. Set TWC and tagged at 106"with 18"extension. Removed SSV and installed 2nd manual swab valve.Torqued all flanges on tree to spec. PT'd bottom side of swab valve and top of master valve to 300 low and 3500 high. Shell tested tree to 300 low and 5000 high. Pulled TWC and tagged at 103"with 18"extension. Installed 2nd IA valve. Page 2 of 2 North America-ALASKA-BP Page 1 ofd Operation Summary Report Common Well Name:MPF-70 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/20/2014 End Date: X3-014HH-C:(3,348,889.00) L. Project:Milne Point Site:M Pt F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:10/6/1995 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA 'UWI:500292260300 Active datum:Orig RKB on MPF-70 @48.15usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 1/20/2014 03:00 - 06:00 3.00 MOB P PRE RIG ACCEPTED AT 03:00 HRS FOR WELL i MPF-70A -REMOVE SNOW DRIFTS AROUND WELL -REMOVE ICE AND LEVEL AROUND WELL 06:00 - 09:00 3.00 MOB P PRE MOVE RIG TO MPF-70A -MOVE RIG OFF OF MPF-53 -PICK UP RIG MATS AND PLACE AROUND MPF-70A. CHECK PRESSURES ON OA,IA AND TUBING. -IAAND TUBING 0 PSI.OA WITH 120 PSI. -BLEED PRESSURE ON OA TO 0 PSI. -DRIVE RIG TO OTHER SIDE OF THE PAD -PRESPUD MEETING HELD WITH DAY CREW. 09:00 - 10:00 1.00 MOB P i PRE MOVE RIG OVER WELL -LINER UP RIG WITH WELL.CONFIRM OA,IA AND TUBING WITH 0 PSI. -DRIVE RIG OVER WELLAND SET DOWN -RIG ACCEPTED ON WELL MPF-70AAT 10:00 HRS. 10:00 - 11:00 1.00 MOB P PRE TEST TREE -LEAK TIGHT TEST TREE. -WELLS MPF-53,78 AND 88 LOCKED OUT-TAGGED OUT PER WELL PLAN. -WELL MPF-52 SIGNED OFF AND HANDED OVER TO PAD OPERATOR. 11:00 - 17:00 6.00 BOPSUR P PRE PJSM AND NIPPLE UP BOP i -RIG UP MPD MANIFOLD AN LINES IN THE CELLAR -NIPPLE UP BOP AND LINES. 17:00 - 17:30 0.50 BOPSUR P PRE **RIG EVACUATION DRILL HELD WITH ALL HANDS WITH POST DRILL AAR** 17:30 - 19:30 2.00 BOPSUR P PRE PREP FOR BOPE TEST -CLEAN AND CLEAR RIG FLOOR -FILL STACK ' -R/U TEST PUMP AND CHART RECORDER II� Printed 1/27/2014 1:24:01PM North America-ALASKA-BP Page 2 offil Operation Summary Report Common Well Name:MPF-70 AFE No Event Type:RE-ENTER-ONSHORE(RON) ' Start Date:1/20/2014 End Date: X3-014HH-C:(3,348,889.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:10/6/1995 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292260300 Active datum:Orig RKB on MPF-70 @48.15usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 00:00 4.50 BOPSUR P PRE PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,SUNDRY#195-153,AND CRT-AK-10-45 -AOGCC INSPECTOR JOHN CRISP WITNESSED TEST AT 16:40 01/20/14. -TEST IS WITNESSED BY TOOLPUSHER AND WSL. -TEST BOPE TO 250/3500 PSI FOR 5 CHARTED MIN -TEST CHOKE VALVES,CHOKE HCR,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES, BOP RAMS AND ANNULAR PREVENTER. -VBR AND ANNULAR TESTED WITH BOTH 2-3/8"AND 3-1/2"TEST JOINTS 1-2-3/8"RAMS TESTED WITH 2-3/8"TEST JOINT -3"RAMS TESTED WITH 3"TEST JOINT -TEST FULL OPENING SAFETY VALVES -FUNCTION BOPE FROM BOTH REMOTE PANELS TEST GAS ALARMS AND DRAW DOWN TEST OF ACCUMULATOR. -TEST PRESSURE DEPLOY SLICKLINE LUBRICATOR -TEST SLB CTS INNER REAL VALVE, PACKOFFS,AND CHECKS 1/21/2014 00:00 - 06:00 6.00 BOPSUR P PRE CONTINUE PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,SUNDRY #195-153,AND CRT-AK-10-45 -AOGCC INSPECTOR JOHN CRISP WAIVED WITNESSING THE BOP TEST AT 16:40 01/20/14. -TEST IS WITNESSED BY TOOLPUSHER AND WSL. -TEST BOPE TO 250/3500 PSI FOR 5 CHARTED MIN TEST CHOKE VALVES,CHOKE HCR,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES, BOP RAMS AND ANNULAR PREVENTER. VBR AND ANNULAR TESTED WITH BOTH 2-3/8"AND 3-1/2"TEST JOINTS -2-3/8"RAMS TESTED WITH 2-3/8"TEST JOINT -3"RAMS TESTED WITH 3"TEST JOINT -TEST FULL OPENING SAFETY VALVES -FUNCTION BOPE FROM BOTH REMOTE PANELS -TEST GAS ALARMS AND DRAW DOWN TEST OF ACCUMULATOR. CONDUCT ARIG EVACUATION DRILL WITH THE NIGHT CREW 06:00 - 10:15 4.25 BOPSUR P PRE PRESSURE TEST MPD SYSTEM -TEST PRESSURE DEPLOY SLICK LINE LUBRICATOR AND HANG IN DERRICK. TEST MPD MANIFOLD AND LINES(LOOP) I-TEST SLB CTS INNER REAL VALVE, 'PACKOFFS,AND CHECKS. 10:15 11:30 1.25 BOPSUR ' P PRE VIP VISIT WITH RIG CREW IN OPS CAB. 11:30 12:00 0.50 BOPSUR P PRE RD SLICKLINE LUBRICATOR. Printed 1/27/2014 1:24:01PM • North America-ALASKA-BP Page 3 otlt Operation Summary Report Common Well Name:MPF-70 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/20/2014 End Date: X3-014HH-C:(3,348,889.00) Project:Milne Point Site:M Pt F Pad Rig Name/No.:'I NORDIC 2 Spud Date/Time:10/6/1995 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292260300 Active datum:Orig RKB on MPF-70 t 48.15usft(above Mean Sea Level) Date From-To 1 Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:00 2.00 BOPSUR P PRE PU INJECTOR. MU LUBRICATOR SECTIONS UNDER SAME. GET ON WELL. PT LUBRICATOR,INNER REEL VALVE,AND PACKOFFS. 250 AND 3500 PSI. PASSED. CHART TEST. 14:00 - 16:00 2.00 BOPSUR P PRE 'MU DFCV ASSEMBLY ON COIL PRESSURE TEST SAME TO 250 AND 3500 PSI. PASEEDI CHART TEST. 16:00 - 17:00 1.00 BOPSUR P PRE STAND BACK INJECTOR. MU NIGHT CAP. PRESSURE TEST TO 250 AND 3500 PSI AGAINST CHOKE MANIFOLD. PASSED. CHART SAME. 17:00 18:00 1.00 BOPSUR P PRE !OPEN WELL TO SURFACE SYSTEM. INITIAL WHP OF 59 PIS OBSERVED. BLEED OFF IMMEDIATELY. FLOW CHECK WELL. 18:00 - 19:30 ' 1.50 BOPSUR P WEXIT MU 3.8"WINDOW MILLING BHA. 2 JTS 2-3/8:PH6. TEST QTS 250/3500 PSI. 19:30 - 20:45 1.25 CLEAN P WEXIT RUN IN HOLE WITH MILLINT BHA TO 1 14,571'MD. 1-IOU/MIN AT 0.50 BPM LONG INITIAL TIE-IN Fl 14,200'T/14,400 GR DEPTH,-4'CORRECTION -ALLOW NEW CHOKE HAND TO PRACTICE USING MPD CHOKE,FOLLOW SIMULATED PRESSURE SCHEDULE AND TRAP TARGET PRESSURE WITH THE PUMPS DOWN -OFFLOAD LINER FROM MPF-53A 20:45 - 00:00 3.25 DISPL P WEXIT DISPLACE WELLTO 9.5 PPG POWER PRO AT 3.25 BPM 'GET UP AND DOWN WEIGHTS=50K UP/20K DOWN TAKE SPRS: RATE PUMP 1 PUMP 2 2.5 BPM 2725 PSI 2739 PSI [1.0 BPM 1399 PSI 1392 PSI 0 .5 BPM 1073 PSI 1077 PSI 1/22/2014 00:00 - 01:30 1.50 STWHIP P WEXIT MILL CEMENT ON TOP OF WHIPSTOCK F/ 14,571'T/14,586.5' -2946 PSI AT 2.64/2.69 BPM IN/OUT -WOB:0.5-3.5 K 50-150 PSI MOTOR WORK. -IA/OA/PVT:556 PSI/621 PSI/230 BBLS. -WHP/BHP/ECD:44 PSI/4024 PSI/11.01 PPG. 01:30 - 06:00 4.50 STWHIP P WEXIT TAG WINDOW PINCH POINT AT 14,586.5' 4-o4.1- TIME MILL WINDOW AT 1'/HR F/14,586.5'T/ -�,1 :14,594' (/ Q -2946 PSI AT 2.64/2.69 BPM IN/OUT /(� J1 -WOB:2.5-3.5 K 150-250 PSI MOTOR f����AC WORK. -IA/OA/PVT:591 PSI/652 PSI/229 BBLS. -WHP/BHP/ECD:44 PSI/4102 PSI/11.05 PPG 06:00 - 06:30 0.50 STWHIP P WEXIT •CREW CHANGE. DISCUSS OPERATIONS AND RIG EQUIPMENT STATUS. CONTINUE TO MILL WINDOW. Printed 1/27/2014 1.24.01PM • North America-ALASKA-BP Page 4 41 Operation Summary Report Common Well Name:MPF-70 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/20/2014 End Date: X3-014HH-C:(3,348,889.00) Project:Milne Point .Site:M Pt F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:10/6/1995 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292260300 Active datum: Orig RKB on MPF-70©48.15usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 07:15 0.75 STWHIP P WEXIT LOG GR TIE IN TO CONFIRM DEPTHS. SUBTRACT 3'CORRECTION. NOT SURE WHY DEPTH CHANGED. BOTH TIE IN LOGS APPEAR CORRECT,WITH GOOD GAMMA PEAKS FOR CORRELATION WITH PDC AND REAL MWD LOGS. 07:15 - 12:00 4.75 STWHIP P WEXIT CONTINUE TO MILL AHEAD FROM 14,590'. 3010 PSI AT 2.70 BPM IN/OUT. 200-300 PSI • MOTOR WORK. DHWOB:2.5-3.3 K# IA/OA:95 PSI/364 PSI. BLEED DOWN FROM 650 EACH. PVT:225 BBLS. UNCORRECTED WINDOW DEPTHS:TOW= 14,582',BOW=14,590' 12:00 - 14:00 2.00 STWHIP P WEXIT :DRESS WINDOW WITH 3 PASSES IN UP AND DOWN DIRECTION. 2922 PSI AT 2.70 BPM IN/OUT. •DRY DRIFT WINDOW. SMOOTH. NOTE 10%FORMATION IN BOTTOMS UP CUTTINGS SAMPLE. WINDOW TOP:14,582'. WINDOW BOTTOM:14,590'. DEPTHS MAY BE ADJUSTED AFTER LOGGING RA TAG. 14.00 - 15:00 1.00 STWHIP P WEXIT CIRCULATE HI VIS SWEEP DOWN HOLE. CHASE WITH 11..8 PPG BRINE. 15:00 - 18:30 3.50 STWHIP P WEXIT CIRCULATE OUT OF HOLE. MAINTAIN ANNULAR PRESSURE ON BHA AS PER DISPLACEMENT PRESSURE SCHEDULE. FLOW CHECK FOR 30 MINUTES. 18:30 - 20:00 1.50 STWHIP P WEXIT LAY DOWN MILLING BHA. -WSL VERIFY GAGE OF MILL 3.80"GO,3.79" NO-GO OFFLOAD BOT TOOLS 20:00 - 21:30 1.50 BOPSUR N SFAL 14,600.00 PROD1 CHECK TREE BOLTS(LOOSE). MPU WELL SUPPORT CALLED OUT. PJSM AND TORQUE TREE BOLTS. _ 21:30 - 22:00 0.50 DRILL P PROD1 PICKUP BUILD BHA. I STAB ON TO WELL. PRESSURE TEST LOWER QTS 250/3500 PSI FOR 5/5 MIN,TEST GOOD. 22:00 00:00 2.00 DRILL P PROD1 RUN IN HOLE WITH BUILD BHA ON COIL TO 10,700' -SPEED=100'/MIN,PUMP RATE=0.3 BPM 1/23/2014 00:00 - 01:30 1.50 DRILL P PROD1 CONTINUE RUN IN HOLE WITH BUILD BHA ON COIL F/10,700' -SPEED=100'/MIN,PUMP RATE=0.3 BPM -TIE-IN TO FORMATION,-9'CORRECTION 01:30 - 02:00 0.50 DRILL P PROD1 DRY DRIFT WINDOW TO VERIFY THAT BHA CAN PASS THROUGH MILLED CEMENT AND WINDOW WITH 3.86DEG AKO MOTOR !INSTALLED,WERE ABLE TO DRIFT WINDOW 02:00 - 04:00 2.00 DRILL P PROD1 '-PICK UP TO 14,560'AND DISPLACE WELL TO 9.5 PPG POWERPRO -HOLD TARGET PRESSURE AT WINDOW FOR DURATION OF DISPLACEMENT -ONLOAD ADDITIONAL 9.5 PPG MUD INTO PITS FOR DRILLING -CLOSE EDC AND RUN TO BOTTOM Printed 1/27/2014 1:24:01 PM • a Tree: 4 1/8" - 5M CIW MPU F-70i Wellhead:11" 5M FMC Gen. 5 w/ - Orig. RF elev. = 46.0' (N 27E) 11" x 4.5" FMC Tbg. Hng. , 4.5" Orig. GL. elev.= 12.0' NSCT threads top and bottom, 4" RT to tbg. spool =32.69' (N 27E) CIW "H" BPV profile NOTE:Well requires the installation of 20" 91.1 ppf, H-40 csg. 113' a SSSV during the next RWO. KOP @ 400' Max. hole angle =72 to 75 deg. f/ 4400' to 12,000' Hole angle through perfs=36 deg. 9 5/8", 40 ppf, L-80 Btrc. 7085' and t 7"26 ppf, L-80, NSCC production casing ( drift ID =6.151", cap. =0.0383 bpf) 4.5", 12.6 ppf, L-80 Btrc. tubing (cap. =0.0152 bpf, drift=3.958") Minimum tubing restriction =3.725" "XN" profile @ 14,238' md. 7" Baker'S-3" Packer 14,215' and Stimulation Summary 4.5" HES 'XN' npl. none performed (w/3.725" no-go 14,238' and 1111 4.5"WLEG 14,248' and Perforation Summary Ref log:02/29/96 SBT/GR/CCI �♦� �� Size SPF Interval (TVD) ' Two 7" marker jts. 4.5" 5 14,596-14,696' (7269'-7351') p f/14,367'to 14,406'wlm 32.0 gm. AlphaJet charges (EHD = £97 TO(..¶Of 0.50"TTP =32.0") @ 135/45 deg ����r'�,� phasing Wik'IPF7'D(.K 1$552 ����4w11, • • �►��. 7"float collar (PBTD) 14,880' and 7"casing shoe 14,969' and DATE REV.BY COMMENTS MILNE POINT UNIT 10/26/95 JBF Drilled and Cased by Nabors 27E WELL F-70i 03/03/96 JBF WIW completion by Nabors 4ES API NO: 50-029-22603 03/24/97 JBF WIW Re-completion by Nabors 4ES _ BP EXPLORATION (AK) w, I77 s� THE STATE Alaska a it and Gas �' of J(A ir,,,oriservation Commission � R„ - GOVERNOR SEAN PARNELL 333 West Seventh Avenue p.0, p. Anchorage, Alaska 99501-3572 ALAS Main: 907.279.1433 Fax: 907.276.7542 John McMullen SCOW Engineering Team Leader BP Exploration (Alaska), Inc. 5 P.O. Box 196612 Anchorage, AK 99519-6612 Re: Milne Point Unit, Kuparuk River Oil, MPF-70 Sundry Number: 313-580 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, T Cathy P. Foerster Chair, Commissioner DATED this day of November, 2013. Encl. STATE OF ALASKA � • •. • ALASOPOIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 1. Type of Request: ❑Abandon •®Plug for Redrill ❑Perforate New Pool ❑Repair Well ❑Change Approved Program ❑Suspend ❑Plug Perforations ❑Perforate ❑Pull Tubing ❑Time Extension ❑Operations Shutdown ❑Re-Enter Suspended Well ❑Stimulate ❑Alter Casing ❑Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration(Alaska) Inc. ❑Exploratory ❑Stratigraphic 195-153 • 3. Address: ❑Development ®Service , 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-22603-00-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? MPF-70 • Will planned perforations require a Spacing Exception? ❑Yes ®No 9. Property Designatior . 10. Field/Pool(s): P ADL 025509&355018 Milne Point Unit/Kuparuk River Sands©i 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 14989' • 7622' 14880' 7520' None None Casing Length Size MD _ TVD Burst Collapse Structural Conductor 72' 20" 38'- 110' 38'- 110' Surface 7049' 9-5/8" 36'-7085' 36'-4486' 5750 3090 Intermediate Production 14936' 7" 33'- 14969' 33'-7603' 7240 5410 Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 14596'- 14696'• 7272'-7354' 4-1/2", 12.6# L-80 14248' Packers and SSSV Type: 7"Baker S-3 Packer Packers and SSSV 14215'/6974' MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: ®Description Summary of Proposal '®BOP Sketch 0 Detailed Operations Program ❑Exploratory ❑Stratigraphic ❑Development : Service . 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation November 22,2013 ❑Oil ❑WINJ ❑WDSPL ❑Plugged 16. Verbal Approval: Date ❑Gas ❑GINJ ❑GSTOR ❑Abandoned Commission Representativ ❑WAG ❑SPLUG ®Suspended • 17. I hereby certify that the�(oi ; ---'and correct to the best of my knowledge. Contact: Mel Rixse,564-5620 Printed Name: Johr C, : 1 Title: Engineering Team Leader E ail: Mel.Rixse @bp.com I / > Signature:i ,,'.' / Phone: 564-4711 Date: G/ E I3 Commission Use Only Conditions of approval: Notify Commission so that a representative may witness 1 Sundry Number \-1. 5c15-0 ❑Plug Integrity ❑BOP Test ❑Mechanical Integrity Test ❑Location Clearance o Other: 71G Al-�G v^w�i� .1-r•-,� ,` lor(?w-�' te,A. 2-6 Al-L ZJ.117--C`3 #- 35 Od ,oS; $&P 7r- Spacing Exception Required? ❑Yes Dr No Subsequent Form Required: / D q07 � APPROVED BY 240 �3 Approved By: % J COMMISSIONER THE COMMISSION Date: ��' Form 10 403 Revised 10/2 12 A ro(a o if I1d f&r'I2 months from the ate of approval Submit In Duplicate pp V R , �w3 ili7i3 F;gz & NOV 2 1 C' . . To: Alaska Oil& Gas Conservation Commission From: Mel Rixse bp Drilling Engineer Date: November 6, 2013 Re: MPF-70 Sundry Approval Sundry approval is requested to plug the MPF-70 perforations as part of the pre-rig work prior to the drilling and completion of proposed MPF-70A, AL1 coiled tubing sidetracks. ✓ History and current status: Nabors 27E drilled MPF-70 in October 1995. In March 1996,Nabors 4ES perforated the well in the Kuparuk A sands and ran a 3-1/2"tubing completion. A RWO was performed in March 1997 to upsize to 4-1/2"tubing (including fishing of the 3-1/2"packer and tubing tail)to allow higher injection rates. Before the RWO injection rates were at 3800 bwpd and after the RWO rates were increased to 4000-4300 bwpd,with a few days right after the RWO at 7800 bwpd. The well started on the gas phase of WAG injection in August 1998 and was on periodic gas injection until August 2010. It has been on water injection only since then, recently at rates around 2200 bwpd. Proposed plan: Sidetrack MPF-70 to the MPF-70A, AL1 locations by Nordic 2 Coiled Tubing /k PP Drilling rig on or around December 15, 2013 using the managed pressure drilling technique with the purpose of the sidetrack to relocate the well to two areas that has beeniditiffed as unswept. The MPF-70A sidetrack will exit the existing 7"liner and kick off in the upper Kuparuk sand and land in Kuparuk Al sand. Situate the MPF-70A lateral in the Kuparuk Al sand and plan the MPF-70AL1 leg to undulate between the Kuparuk A2 and A3 sands to support planned MPF-78A prospect and MPF- 53A prospect producers. This bi-lateral sidetrack will be completed with 2-7/8"TH511 slotted liner and blanks over faults/swept zones with solid liner tie back into the parent wellbore. This Sundry covers plugging the existing MPF-70 perforations via the pre-rig coil cement job (alternate plug placement per 20 AAC 25.112(i)) The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. �dl�co/ 4G^� rk ex"r'P,c� /rgfr' ver �C�" /'?, (fit/: r 4 ,A1 vl t, - (%r:Prg( Ao c, onnrf 1#10d, 5Ateet And Fecoveal, -from i4, fort//K of- p/, ���' `113'x' • • Pre-Rig Work(scheduled to begin November 15th,2013) 1. E Mill XN nipple to 3.80" 2. E Drift for 4-1/2"x 7"whipstock 14,650'MD 3. E Set 4-1/2"x7" whipstock at 14,583' MD Squeeze 17 bbl, 15.8 ppg cement past whipstock&squeeze 5bbls into 4. formation. (TOC @ 14,583' MD) * 5. F Full bore pressure test to 2500 psi. C -/So .:•� 6. V Set BPV if failed pressure test 7. V PTMV,SV,WV * Approved alternate plug placement per 20 AAC 25.112(i) Rig Work(scheduled to begin December 15th,2013) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2710 psi) 2. Mill 3.80" window at 14,583' and 10'of rathole. 3. Drill A lateral: 4.125" OH, 2012' (44 BUR/12° Lateral DLS planned) 4. Run 2-7/8" Solid/Slotted liner with aluminum KO billet,top at 14,850 MD. 5. Drill AL1 lateral: 4.125" OH, 2019' (12 deg DLS planned) 8. Run 2-7/8" Slotted/solid liner,top at 14,220' MD. 9. Freeze protect well to 2500' MD 10. Set TWC; RDMO Post-Rig Work: 1. Pull TWC 2. Re-install wellhouse, flowline. Mel Rixse Operations Drilling Engineer 564-5620 CC: Well File Joe Lastufka • • • Tree: 4 1/8"-5M CIW MPU F-701 Wellhead: 11" 5M FMC Gen. 5 w/ Orig. RF elev. = 46.0' (N 27E) 11" x 4.5" FMC Tbg. Hng. ,4.5" Orig. GL.elev.= 12.0' NSCT threads top and bottom, 4" RT to tbg.spool =32.69' (N 27E) CIW "H" BPV profile NOTE:Well requires the installation of 20" 91.1 ppf, H-40 csg. 113' a SSSV during the next RWO. 4 KOP @ 400' Max. hole angle =72 to 75 deg.f/ 4400' to 12,000' Hole angle through perfs=36 deg. 9 5/8", 40 ppf, L-80 Btrc. 7085' and A 7"26 ppf, L-80, NSCC production casing (drift ID =6.151", cap. =0.0383 bpf) 4.5", 12.6 ppf, L-80 Btrc.tubing (cap. = 0.0152 bpf, drift= 3.958") k '> Minimum tubing restriction =3.725" "XN" profile @ 14,238'md. ( 7" Baker'S-3" Packer 14,215'and Stimulation Summary 4.5" HES 'XN' npl. 14,238'and none performed (w/3.725" no-go 4.5"WLEG 14,248' and Perforation Summary Ref log:02/29/96 SBT/GR/CCI Size SPF Interval (TVD) Two 7" marker jts. 4.5" 5 14,596-14,696' (7269'-7351') f/ 14,367'to 14,406'wlm 32.0 gm.AlphaJet charges (EHD = 0.50"TTP = 32.0") @ 135/45 deg. phasing 7"float collar(PBTD) 14,880'and Affilik 7"casing shoe 14,969' and DATE REV.BY COMMENTS MILNE POINT UNIT 10/26/95 JBF Drilled and Cased by Nabors 27E WELL F-70i 03/03/96 JBF WIW completion by Nabors 4ES API NO: 50-029-22603 03/24/97 JBF WIW Re-completion by Nabors 4ES BP EXPLORATION (AK) • „ MPU� 7 AL1 0 70A, Tree: 4 1/8 - 5M CIW proposed CTD sidetrack Wellhead: 11" 5M FMC Gen. 5 w/ p Orig. RF elev. = 46.0' (N 27E) 11" x 4.5" FMC Tbg. Hng. , 4.5" Orig. GL. elev.= 12.0' NSCT threads top and bottom, 4" RT to tbg. spool = 32.69' (N 27E) CIW "H" BPV profile NOTE:Well requires the installation of 20" 91.1 ppf, H-40 csg. 113' a SSSV during the next RWO. KOP @ 400' Max. hole angle = 72 to 75 deg. f/ 4400' to 12,000' Hole angle through perfs =36 deg. 9 5/8", 40 ppf, L-80 Btrc. 7085' and , 7" 26 ppf, L-80, NSCC production casing ( drift ID =6.151", cap. =0.0383 bpf) 4.5", 12.6 ppf, L-80 Btrc.tubing (cap. = 0.0152 bpf, drift= 3.958") Minimum tubing restriction = 3.725" "XN" profile @ 14,238' md. ■a= 7" Baker 'S-3" Packer 14,215' and x 2-7/8"TOL Liner-14,220' Stimulation Summary 4.5" HES 'XN' npl. 14,238' and none performed (w/3.725"no-go M,r,ea to 3.80" Two 7" marker jts. f/ 14,367'to 14,406'wlm 4.5"WLEG 14,248' and Perforation Summary Ref log:02/29/96 SBT/GR /CCl 2-7/8"L-80 Slotted Liner-16,869' TOWS 4-1/2"x 7" @ 14,583' n� y Size SPF Interval (TVD) r� 4.5" 5 14,596-14,696' (7269'-7351') , . �, �, 3r-Whipstock cemented A 32.0 gm.AlphaJet charges (EHD = } t } 1 ' 2-7/8"L-80 Slotted Liner from 0.50"TTP = 32.0") @ 135/45 deg. i 1 14,850'MD to 16,862' 1 }} f k phasing 7"float collar (PBTD) 14,880' and 7"casing shoe 14,969' and DATE REV BY COMMENTS MILNE POINT UNIT 10/26/95 JBF Drilled and Cased by Nabors 27E WELL F-70i 03/03/96 JBF WIW completion by Nabors 4ES API NO: 50-029-22603 03/24/97 JBF WIW Re-completion by Nabors 4ES BP EXPLORATION (AK) NORDIC CTD UNIT#2 CHOKE / REEL/CIRCULATION MANIFOLD DIAGRAM 'r B Cho e Ppnel Standpipe 2"Circulation Line } • / '� MM ii tp-C*al�Sta BOP 26 ,I. / ri Duller Gauge A• MM 10 Manual Choke O 9 G CIRCULATING MANIFOLD — MM a MM a MM 18 ,_ / '`�yjry•]/ BOP 27 MM 15 MM 6 ! Gw BOP 28 ` � F SLB Transducer �f+ PVT Sensor I MM +f� BOP 10 -. � Baker Choke _„., MM13 MM4 ® MM17 i AA* •MC Rev Cir Line Last Update 23-Sep-13 _ �4,e Blow down �: MM14 BOP]f Blind/Shear Updated by Matt Ross — • , _ ‘`/ Removed lower set of B/S —' +�. . BOP 12 SI LT Pipe/Slip i 80PN BOP 24 BOP 23 BOP 19 KILL SIDE KILL SIDE ® VAL EK MANUAL MANUAL BOP 20 VALVE VALVE BOP 13 BOP 21 CHOKE SIDE Coiled Tubing I. MM 18 / BHA Pipe/Slip MANUAL VALVE treaIIMIIBIMI MP.. ..,., Bre �lelf....:ar•e••w / s I Ba rChoke \\\\I•D��` / OP BHA P t/Sl p r, /BOP 22 CHOKE HCR VALVE ' 2 f. MP 1 �(_. I ti r f I- "` Kill Line 1 ,... a — / irtYCt�:4►�.4txy-►t -1 �cm.m.,,►'A ._ I ao.■ HP 11 HP 10 Tr nduder•i , COILED TUBING ( / ' II Choke Line I } -.. CIRCULATING SYSTEM I/ I BOP 1s il VBR's 4... ® HP 18 _ I Kill Line—+! P19 HP 14 HPB * CSM 1 CSM 2 4 / ,d BOP16 F CT Pipe/Slip �i. II. w 40 - To Inner Reel/ I M \ BOP 18 0 Valve �� J 10 +` ,, "-BOP17 HP 15 HP 7 HP 5 HP3 / I CSM 3 CSM 4 I 4- 4 HP 13 / I I BOP 4 If% „ I • HP 12 HP 2 HP I CSM 7 BOP S Ai HP 18 /. I I Bops ... I �� il1 Frr - :' : BOP 2 uu X Cement line N2 >. SLB / ' BOP 1 p :CHOKE MANIFOLD ,,i i BOP 6 P17 N2 TriFlow A/CM 85 MGS Gauge Ni / '' -I CM 29 ' 1" CHOKE LINE I.1' ' GAS BUS - _ — - I - BOP 30 _ Test Pump Inlet CM 30 / # ' / - t — 1 CM3 BOP 29 `� 7 Hr -uqe PB1 T Flow f/HC• 7 c - - Not •4 / Cfi 4Way Block CM14 CM1/ Cr'A. - .-. CM24 - - — e'mild C C-13 C,. 1 - • _ - leg is —.. — Baker Choke Line m — - high . - from wal + `NCR v 4rHONE LINE O CMI3 y .„,,. .......... ;■ pi ::: PEIELLV • :::oro Cum Ar _ CM 25 CHOKE LINE 11_..- CM28 _ �4!'I 11_11 CM18 CM19 mold CM27 TIGER TANK / Nordic-blister Cadential i • e Page 1 of 1 I Subject: FW: INTENT PLUG for RE-DRILL WELLS: Corrected From: Davies, Stephen F (DOA) Sent: Monday, February 08, 2010 10:52 AM To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C (DOA); Aubert, Winton G (DOA) Subject: RE: INTENT PLUG for RE-DRILL WELLS: Corrected Revised procedure with an additional step per Cathy's comment: INTENT PLUG for RE-DRILL WELLS (IPBRD)Type Work Code in RBDMS 1. When a Form 10-403 is submitted requesting approval to plug a well for redrill,the initial reviewer(Art i or Steve D.) will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403 form is checked. If the "Abandon" box is checked,we will cross that erroneous entry out and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2. On the Form 10-403 if"Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve D. will cross that erroneous entry out and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). Instead,we will check the "Suspended" box. Guy and Winton will serve as quality control for steps 1 and 2. 3. When Steve McMains receives the Form 10-403 with a check in the "Plug for Redrill" box, he will enter the existing code "IBPRD" into RBDMS. This code automatically generates a comment under the History tab-stating "Intent: Plug for Redrill. 4. When Steve McMains receives any Form 10-407, he will check the History tab in RBDMS for this comment. If he sees the "Intent: Plug for Redrill" code, and cannot find any evidence that a subsequent re-drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no matter what status is listed on the 10-407. Steve will also change the status on the 10-407 form to SUSPENDED, and will date and initial his change. If Steve does not see the"Intent: Plug for Redrill" comment or code, he will enter the status listed on the Form 10-407 into RBDMS. 5. When the Form 10-407 for the redrill is received, Steve M. will change the original well's status from suspended to abandoned. 6. The first week of every January and July,Steve M.and Steve D. will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, Steve M. and Steve D.will also review the list of suspended wells for accuracy. Thanks, Steve D. ^. ,T ,^ . r, 1%T, ,___-- T_--a..__-4:---,.%T7[11 TATTUATT DT T T c"...DT: TIPT A/ti/7(111 • • gyro data 4' Gyrodata Incorporated qY 23000 Northwest Lake Dr. 3` ( A r' 5 s; (7; ( % Houston, TX 77095 (281) 213 -6300 Fax: (281) 213 -6301 NEBni 2 X013 SGAH June 6, 2013 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 t Re: Drill Site: Milne Point, Well #MPF -70 Prudhoe Bay, Alaska Enclosed, please find two (2) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, Rob Shoup Vice President, Special Projects RS:kr Serving the Worldwide Energy Industry with Precision Survey Instrumentation ter. • • gyro/data y:. Gyrodata Incorporated 23000 Northwest Lake Dr. Houston, TX 77095 (281) 213 -6300 Fax: (281) 213 -6301 SURVEY REPORT BP Exploration Drill Site: Milne Point, Well: MPF -45 Schlumberger Truck & Crane Prudhoe Bay, AK AK0413GCM129 12 April 2013 Serving the Worldwide Energy Industry with Precision Survey Instrumentation 9 5 3 A Gyrodata Directional Survey for BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING • Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 Azimuth Correction: Gyro: Bearings are Relative to True North Run Date: 12 Apr 2013 Report Generated: 06 Jun 2013 11:24 Depth Reference: Rotary Table Surveyor: Edwin Hardon Air Gap (RKB to Ground / RKB to MSL): 46.00 Calculation Method: MINIMUM CURVATURE Vertical Section Calculated from Well Head Location Survey surface coordinates obtained from: Drilling Engineer Survey Latitude: 70.508289 deg. N Longitude: 149.656603 deg. W Closure Calculated from Well Head Location • Horizontal Coordinates Calculated from Well Head Location A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.00 N 0.00 E RATE GYROSCOPIC CONTINUOUS SURVEY ALL MEASURED DEPTHS AND COORDINATES REFERENCED TO RKB OF 46.0 FT RKB @46FT - REFERENCE ELEVATION @12.33FT -8.8FT TO THE SWAB -3.5FT TO THE SENSOR= 21.37FT AT THE ZERO POINT 100.00 0.01 275.06 0.01 100.00 0.0 275.1 0.00 N 0.01 W 200.00 0.61 312.35 0.60 200.00 0.6 310.9 0.36 N 0.42W 300.00 1.06 320.78 0.46 299.99 2.0 315.8 1.43 N 1.39W 400.00 1.05 330.33 0.18 399.97 3.8 320.5 2.94 N 2.43 W 500.00 1.12 334.08 0.10 499.95 5.7 324.4 4.62 N 3.31 W 600.00 1.31 352.68 0.44 599.93 7.7 329.7 6.64 N 3.88W 700.00 1.58 338.85 0.43 699.90 10.1 333.4 9.06 N 4.53 W 800.00 2.02 342.75 0.46 799.85 13.2 335.2 12.03 N 5.55W 900.00 2.37 344.23 0.36 899.78 17.0 337.1 15.70 N 6.63 W • 1000.00 2.60 344.37 0.22 999.68 21.4 338.6 19.88 N 7.80W 1100.00 2.83 343.01 0.24 1099.57 26.1 339.5 24.42 N 9.14W 1200.00 3.24 340.16 0.44 1199.43 31.4 339.8 29.43 N 10.82W 1300.00 4.07 338.69 0.84 1299.22 37.7 339.7 35.40 N 13.06W 1400.00 4.93 339.33 0.86 1398.92 45.6 339.6 42.73 N 15.87 W 1500.00 5.76 340.75 0.84 1498.48 54.9 339.7 51.49 N 19.05W 1600.00 6.50 342.56 0.76 1597.91 65.6 340.0 61.63 N 22.40 W 1700.00 7.32 343.29 0.83 1697.18 77.6 340.5 73.13 N 25.92W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 1800.00 7.63 341.99 0.35 1796.33 90.6 340.8 85.54 N 29.81W 1900.00 8.65 340.55 1.04 1895.32 104.7 340.8 98.95 N 34.36W 1925.00 9.07 341.53 1.79 1920.02 108.6 340.9 102.59 N 35.61W 1950.00 9.55 342.13 1.98 1944.69 112.6 340.9 106.43 N 36.88W 1975.00 10.11 342.22 2.22 1969.33 116.9 340.9 110.50 N 38.18W 2000.00 10.70 343.27 2.50 1993.91 121.4 341.0 114.81 N 39.52 W 2025.00 11.26 343.83 2.26 2018.46 126.2 341.1 119.38 N 40.87W 2050.00 11.69 344.23 1.74 2042.96 131.1 341.2 124.16 N 42.24W 2075.00 12.12 344.96 1.82 2067.42 136.3 341.3 129.13 N 43.61W 2100.00 13.11 346.09 4.09 2091.82 141.7 341.5 134.41 N 44.97W 2125.00 13.79 346.62 2.77 2116.13 147.5 341.7 140.07 N 46.34W 2150.00 14.26 346.94 1.91 2140.39 153.6 341.9 145.96 N 47.72W 2175.00 15.10 347.43 3.40 2164.57 159.9 342.1 152.14 N 49.13W • 2200.00 2225.00 16.25 348.30 4.69 2188.64 166.6 342.3 158.75 N 50.55W 17.20 348.85 3.85 2212.58 173.8 342.6 165.80 N 51.97W 2250.00 17.95 349.23 3.04 2236.41 181.3 342.9 173.21 N 53.41W 2275.00 18.47 349.58 2.10 2260.16 189.0 343.1 180.89 N 54.84 W 2300.00 19.59 350.12 4.56 2283.79 197.1 343.4 188.92 N 56.28 W 2325.00 20.15 350.20 2.21 2307.30 205.6 343.7 197.29 N 57.73 W 2350.00 20.53 350.32 1.55 2330.75 214.2 344.0 205.85 N 59.20W 2375.00 21.44 350.72 3.69 2354.09 223.1 344.2 214.69 N 60.67W 2400.00 21.95 350.85 2.04 2377.32 232.3 344.5 223.81 N 62.15W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 2425.00 22.64 350.85 2.75 2400.45 241.7 344.7 233.17 N 63.66W 2450.00 23.24 351.11 2.46 2423.47 251.4 345.0 242.79 N 65.19W 2475.00 23.92 351.31 2.74 2446.38 261.3 345.2 252.68 N 66.72W 2500.00 24.66 351.41 2.97 2469.17 271.6 345.4 262.84 N 68.26W 2525.00 24.98 351.45 1.26 2491.86 282.0 345.7 273.22 N 69.83 W 2550.00 25.60 351.39 2.50 2514.47 292.6 345.9 283.78 N 71.42W 2575.00 26.13 351.53 2.14 2536.96 303.5 346.1 294.57 N 73.04W 2600.00 26.61 351.57 1.91 2559.36 314.5 346.3 305.55 N 74.67W 2625.00 27.29 351.74 2.76 2581.64 325.8 346.5 316.76 N 76.31W 2650.00 27.76 351.99 1.92 2603.81 337.3 346.6 328.20 N 77.95 W 2675.00 28.74 352.55 4.07 2625.84 349.1 346.8 339.92 N 79.54 W 2700.00 29.37 352.91 2.59 2647.69 361.2 347.0 351.97 N 81.08W 2725.00 29.96 353.05 2.41 2669.41 373.5 347.2 364.25 N 82.59 W • 2750.00 30.78 353.69 3.51 2690.98 386.1 347.4 376.80 N 84.05 W 2775.00 31.30 353.98 2.16 2712.40 398.9 347.6 389.62 N 85.43 W 2800.00 31.91 354.24 2.50 2733.69 411.9 347.8 402.65 N 86.78W 2825.00 32.62 354.32 2.86 2754.83 425.2 348.0 415.93 N 88.11W 2850.00 33.33 354.36 2.82 2775.81 438.7 348.2 429.47 N 89.45W 2875.00 34.22 354.37 3.58 2796.59 452.5 348.4 443.30 N 90.81W 2900.00 34.67 354.57 1.85 2817.20 466.6 348.6 457.38 N 92.17W 2925.00 35.37 354.85 2.89 2837.68 480.8 348.8 471.66 N 93.50W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 2950.00 35.98 355.07 2.50 2857.98 495.3 349.0 486.19 N 94.78 W 2975.00 36.29 355.17 1.23 2878.17 510.0 349.1 500.88 N 96.03 W 3000.00 36.53 355.42 1.13 2898.29 524.8 349.3 515.66 N 97.25W 3025.00 36.81 355.50 1.16 2918.35 539.6 349.5 530.55 N 98.43 W 3050.00 37.22 355.50 1.63 2938.31 554.6 349.7 545.55 N 99.61W 3075.00 37.82 355.47 2.38 2958.14 569.7 349.8 560.73 N 100.81W 3100.00 38.25 355.54 1.73 2977.83 585.0 350.0 576.09 N 102.02W 3125.00 39.07 355.59 3.31 2997.35 600.6 350.1 591.66 N 103.22W 3150.00 39.86 355.87 3.23 3016.65 616.4 350.2 607.50 N 104.41W 3175.00 40.69 356.23 3.43 3035.72 632.5 350.4 623.63 N 105.52W 3200.00 41.28 356.48 2.45 3054.60 648.8 350.5 639.99 N 106.56W 3225.00 41.77 356.48 1.98 3073.31 665.3 350.7 656.53 N 107.58W 3250.00 42.28 356.51 2.02 3091.88 681.9 350.8 673.24 N 108.60W 3275.00 42.84 356.57 2.24 3110.30 698.8 351.0 690.11 N 109.62W • 3300.00 43.39 356.42 2.26 3128.55 715.8 351.1 707.17 N 110.67W 3325.00 44.01 356.47 2.46 3146.62 733.0 351.2 724.41 N 111.74W 3350.00 44.83 356.59 3.33 3164.48 750.4 351.4 741.87 N 112.80W 3375.00 45.70 356.60 3.44 3182.07 768.1 351.5 759.60 N 113.85W 3400.00 46.66 356.72 3.86 3199.38 786.0 351.6 777.61 N 114.90W 3425.00 47.30 356.77 2.57 3216.44 804.3 351.7 795.85 N 115.94W 3450.00 48.09 356.89 3.18 3233.27 822.7 351.8 814.31 N 116.96W 3475.00 48.65 357.06 2.30 3249.88 841.3 351.9 832.97 N 117.95W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 3500.00 49.08 357.07 1.71 3266.32 860.0 352.1 851.78 N 118.91W 3525.00 49.51 356.81 1.93 3282.63 878.9 352.2 870.70 N 119.93W 3550.00 50.04 356.41 2.43 3298.77 898.0 352.3 889.76 N 121.05W 3575.00 50.46 355.68 2.81 3314.76 917.1 352.3 908.93 N 122.38W 3600.00 50.96 355.18 2.51 3330.59 936.5 352.4 928.22 N 123.92W 3625.00 51.40 354.68 2.36 3346.26 955.9 352.4 947.62 N 125.64 W 3650.00 52.04 354.23 2.92 3361.75 975.5 352.5 967.15 N 127.54W 3675.00 52.52 353.97 2.08 3377.04 995.3 352.5 986.82 N 129.57W 3700.00 52.88 353.58 1.91 3392.19 1015.2 352.5 1006.59 N 131.73W 3725.00 53.56 353.12 3.08 3407.16 1035.2 352.6 1026.48 N 134.05W 3750.00 54.20 352.75 2.82 3421.90 1055.4 352.6 1046.52 N 136.53W 3775.00 54.69 352.38 2.31 3436.44 1075.7 352.6 1066.69 N 139.16W 3800.00 55.25 352.07 2.47 3450.79 1096.2 352.6 1086.97 N 141.93W • 3825.00 3850.00 56.13 351.64 3.78 3464.88 1116.8 352.5 1107.41 N 144.86W 56.79 351.38 2.78 3478.69 1137.7 352.5 1128.02 N 147.94W 3875.00 57.33 351.30 2.16 3492.29 1158.7 352.5 1148.76 N 151.10W 3900.00 57.95 351.34 2.51 3505.67 1179.8 352.5 1169.64 N 154.28W 3925.00 58.63 351.40 2.72 3518.81 1201.0 352.5 1190.66 N 157.47W 3950.00 59.57 351.51 3.77 3531.65 1222.5 352.4 1211.88 N 160.66W 3975.00 60.16 351.52 2.36 3544.20 1244.1 352.4 1233.26 N 163.85W 4000.00 60.80 351.55 2.58 3556.52 1265.9 352.4 1254.78 N 167.05W 4025.00 61.66 351.70 3.48 3568.55 1287.8 352.4 1276.46 N 170.25W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 4050.00 62.33 351.75 2.66 3580.29 1309.8 352.4 1298.30 N 173.42W 4075.00 63.03 351.82 2.84 3591.76 1332.0 352.4 1320.29 N 176.60W 4100.00 64.00 352.19 4.09 3602.91 1354.4 352.4 1342.44 N 179.71W 4125.00 64.92 352.41 3.75 3613.69 1377.0 352.4 1364.80 N 182.73W 4150.00 65.72 352.49 3.20 3624.13 1399.7 352.4 1387.32 N 185.71W 4175.00 66.36 352.52 2.58 3634.28 1422.5 352.4 1409.97 N 188.69W 4200.00 67.12 352.59 3.05 3644.16 1445.5 352.4 1432.74 N 191.67W 4225.00 67.86 352.57 2.98 3653.73 1468.6 352.4 1455.64 N 194.65 W 4250.00 68.56 352.59 2.79 3663.00 1491.8 352.4 1478.66 N 197.65 W 4275.00 69.22 352.58 2.64 3672.01 1515.1 352.4 1501.79 N 200.66W 4300.00 69.81 352.53 2.38 3680.76 1538.6 352.4 1525.01 N 203.70W 4325.00 70.34 352.51 2.10 3689.27 1562.1 352.4 1548.32 N 206.76W 4350.00 71.00 352.53 2.67 3697.55 1585.7 352.4 1571.71 N 209.83 W • 4375.00 4400.00 71.44 352.55 1.72 3705.60 1609.3 352.4 1595.17 N 212.90W 71.84 352.58 1.64 3713.47 1633.0 352.4 1618.70 N 215.97W 4425.00 72.32 352.65 1.90 3721.16 1656.8 352.4 1642.29 N 219.03W 4450.00 72.44 352.71 0.53 3728.73 1680.7 352.4 1665.92 N 222.06W 4475.00 72.55 352.68 0.48 3736.25 1704.5 352.4 1689.57 N 225.09W 4500.00 72.51 352.70 0.17 3743.76 1728.3 352.4 1713.23 N 228.13 W 4525.00 72.49 352.80 0.39 3751.27 1752.2 352.4 1736.88 N 231.14W 4550.00 72.83 352.94 1.47 3758.72 1776.1 352.4 1760.56 N 234.10W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 4575.00 73.16 353.40 2.19 3766.03 1800.0 352.4 1784.30 N 236.94W 4600.00 73.55 353.95 2.62 3773.20 1823.9 352.5 1808.10 N 239.58 W 4625.00 74.21 354.39 3.12 3780.14 1847.9 352.5 1832.00 N 242.02W 4650.00 74.42 354.77 1.69 3786.90 1872.0 352.5 1855.96 N 244.29W 4675.00 74.85 354.88 1.77 3793.52 1896.1 352.5 1879.96 N 246.47W 4700.00 74.71 354.93 0.60 3800.09 1920.2 352.6 1903.99 N 248.61 W 4725.00 74.59 354.87 0.50 3806.70 1944.2 352.6 1928.00 N 250.75W 4750.00 74.37 354.72 1.06 3813.39 1968.3 352.6 1951.99 N 252.94W 4775.00 73.78 354.74 2.36 3820.25 1992.3 352.6 1975.93 N 255.15W 4800.00 73.60 354.88 0.92 3827.27 2016.3 352.7 1999.83 N 257.32W 4825.00 73.07 355.49 3.14 3834.44 2040.2 352.7 2023.69 N 259.33 W 4850.00 72.85 356.00 2.14 3841.76 2064.1 352.7 2047.53 N 261.10W 4875.00 72.83 356.30 1.15 3849.14 2088.0 352.8 2071.36 N 262.71 W 4900.00 72.37 356.91 2.98 3856.62 2111.8 352.8 2095.18 N 264.12W • 4925.00 72.21 357.62 2.77 3864.22 2135.5 352.9 2118.97 N 265.26W 4950.00 72.31 358.13 1.98 3871.84 2159.2 352.9 2142.76 N 266.14W 4975.00 72.37 358.40 1.05 3879.42 2182.9 353.0 2166.57 N 266.86W 5000.00 72.31 358.46 0.32 3887.01 2206.7 353.0 2190.38 N 267.51 W 5025.00 72.07 358.37 1.02 3894.66 2230.4 353.1 2214.18 N 268.17W 5050.00 72.25 358.28 0.80 3902.31 2254.1 353.1 2237.96 N 268.87W 5075.00 72.15 358.14 0.66 3909.96 2277.8 353.2 2261.76 N 269.61 W 5100.00 71.96 358.04 0.88 3917.66 2301.5 353.3 2285.53 N 270.40 W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 5125.00 72.16 358.02 0.81 3925.36 2325.2 353.3 2309.30 N 271.22W 5150.00 71.97 358.00 0.76 3933.06 2348.9 353.3 2333.07 N 272.05 W 5175.00 71.99 358.00 0.09 3940.80 2372.6 353.4 2356.83 N 272.88 W 5200.00 71.91 357.90 0.49 3948.54 2396.3 353.4 2380.58 N 273.73 W 5225.00 71.82 357.87 0.37 3956.32 2420.0 353.5 2404.32 N 274.60W 5250.00 71.88 357.92 0.30 3964.11 2443.6 353.5 2428.06 N 275.48 W 5275.00 71.78 358.00 0.51 3971.90 2467.3 353.6 2451.80 N 276.32W 5300.00 71.96 358.00 0.71 3979.68 2491.0 353.6 2475.55 N 277.15W 5325.00 71.88 358.02 0.33 3987.44 2514.7 353.7 2499.30 N 277.98 W 5350.00 71.81 358.01 0.27 3995.23 2538.4 353.7 2523.04 N 278.80W 5375.00 71.74 357.95 0.35 4003.05 2562.1 353.7 2546.77 N 279.64W 5400.00 71.77 357.98 0.16 4010.88 2585.8 353.8 2570.50 N 280.48 W 5425.00 71.92 357.94 0.63 4018.67 2609.4 353.8 2594.24 N 281.32W 5450.00 71.64 357.92 1.14 4026.48 2633.1 353.8 2617.97 N 282.18 W • 5475.00 71.66 357.93 0.07 4034.35 2656.8 353.9 2641.68 N 283.04W 5500.00 72.04 357.95 1.53 4042.14 2680.5 353.9 2665.42 N 283.89W 5525.00 72.43 357.95 1.57 4049.77 2704.2 354.0 2689.22 N 284.75 W 5550.00 72.89 357.97 1.83 4057.22 2728.1 354.0 2713.06 N 285.60W 5575.00 72.80 358.03 0.41 4064.60 2751.9 354.0 2736.94 N 286.43 W 5600.00 72.45 358.06 1.39 4072.06 2775.7 354.1 2760.78 N 287.24 W 5625.00 72.47 358.08 0.09 4079.60 2799.5 354.1 2784.61 N 288.05W 5650.00 72.38 358.15 0.44 4087.15 2823.2 354.1 2808.43 N 288.83 W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 5675.00 72.50 358.06 0.60 4094.69 2847.0 354.2 2832.25 N 289.62W 5700.00 72.57 357.71 1.36 4102.19 2870.8 354.2 2856.08 N 290.50W 5725.00 72.62 357.23 1.84 4109.67 2894.6 354.2 2879.91 N 291.55W 5750.00 72.62 356.91 1.22 4117.13 2918.5 354.2 2903.74 N 292.77 W 5775.00 72.35 356.76 1.23 4124.66 2942.3 354.3 2927.55 N 294.09 W 5800.00 72.46 356.79 0.47 4132.21 2966.1 354.3 2951.34 N 295.43 W 5825.00 72.28 356.70 0.79 4139.78 2989.9 354.3 2975.13 N 296.78 W 5850.00 71.96 356.51 1.49 4147.46 3013.7 354.3 2998.88 N 298.19W 5875.00 72.15 356.25 1.25 4155.16 3037.4 354.3 3022.61 N 299.69 W 5900.00 72.33 356.05 1.05 4162.79 3061.2 354.4 3046.37 N 301.29W 5925.00 72.75 356.04 1.68 4170.29 3085.1 354.4 3070.16 N 302.93 W 5950.00 72.51 356.07 0.96 4177.75 3108.9 354.4 3093.96 N 304.58 W 5975.00 72.52 356.20 0.50 4185.27 3132.8 354.4 3117.75 N 306.18W • 6000.00 6025.00 73.14 356.25 2.50 4192.64 3156.6 354.4 3141.59 N 307.76W 73.57 356.31 1.73 4199.80 3180.6 354.4 3165.49 N 309.31 W 6050.00 74.01 356.22 1.77 4206.78 3204.6 354.4 3189.44 N 310.87W 6075.00 74.53 356.17 2.12 4213.56 3228.6 354.4 3213.45 N 312.47W 6100.00 75.18 355.97 2.71 4220.09 3252.7 354.5 3237.53 N 314.13W 6125.00 75.67 355.86 2.01 4226.38 3276.9 354.5 3261.66 N 315.85W 6150.00 75.49 355.75 0.84 4232.61 3301.1 354.5 3285.81 N 317.62W 6175.00 75.36 355.75 0.55 4238.90 3325.3 354.5 3309.94 N 319.41W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 6200.00 75.62 355.73 1.04 4245.16 3349.5 354.5 3334.08 N 321.21W 6225.00 75.31 355.69 1.24 4251.44 3373.7 354.5 3358.21 N 323.02 W 6250.00 75.26 355.64 0.28 4257.79 3397.9 354.5 3382.32 N 324.85 W 6275.00 75.18 355.65 0.31 4264.17 3422.1 354.5 3406.42 N 326.68 W 6300.00 75.12 355.67 0.24 4270.57 3446.2 354.5 3430.52 N 328.51 W 6325.00 75.17 355.59 0.36 4276.98 3470.4 354.5 3454.61 N 330.35W 6350.00 74.85 355.50 1.32 4283.45 3494.5 354.5 3478.69 N 332.23 W 6375.00 74.97 355.46 0.50 4289.95 3518.7 354.6 3502.75 N 334.13W 6400.00 74.98 355.45 0.04 4296.43 3542.8 354.6 3526.82 N 336.05 W 6425.00 75.00 355.37 0.32 4302.91 3566.9 354.6 3550.89 N 337.98 W 6450.00 74.98 355.30 0.28 4309.38 3591.1 354.6 3574.96 N 339.94W 6475.00 74.55 355.18 1.81 4315.95 3615.2 354.6 3599.00 N 341.94W 6500.00 74.69 355.18 0.58 4322.58 3639.3 354.6 3623.02 N 343.97W 6525.00 74.59 355.13 0.43 4329.21 3663.4 354.6 3647.04 N 346.01 W • 6550.00 74.43 355.03 0.77 4335.88 3687.5 354.6 3671.04 N 348.07W 6575.00 74.42 355.01 0.09 4342.60 3711.6 354.6 3695.03 N 350.16W 6600.00 74.12 355.23 1.47 4349.37 3735.6 354.6 3719.01 N 352.21W 6625.00 74.51 355.58 2.08 4356.13 3759.7 354.6 3743.00 N 354.14W 6650.00 74.49 356.16 2.24 4362.81 3783.8 354.6 3767.03 N 355.87W 6675.00 74.40 356.39 0.96 4369.52 3807.9 354.6 3791.06 N 357.44W 6700.00 74.45 356.42 0.22 4376.23 3831.9 354.6 3815.09 N 358.95 W 6725.00 74.07 356.32 1.56 4383.02 3856.0 354.6 3839.11 N 360.47W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. ID 6750.00 74.24 356.22 0.81 4389.84 3880.0 354.6 3863.11 N 362.03 W 6775.00 74.15 356.08 0.65 4396.65 3904.1 354.7 3887.11 N 363.65 W 6800.00 73.89 356.03 1.06 4403.53 3928.1 354.7 3911.09 N 365.30W 6825.00 73.92 356.06 0.15 4410.46 3952.1 354.7 3935.05 N 366.96W 6850.00 73.45 355.98 1.89 4417.49 3976.1 354.7 3958.98 N 368.63 W 6875.00 73.40 355.92 0.30 4424.62 4000.1 354.7 3982.88 N 370.32W 6900.00 73.30 355.86 0.49 4431.78 4024.0 354.7 4006.77 N 372.03 W 6925.00 73.21 355.79 0.42 4438.98 4047.9 354.7 4030.65 N 373.78 W 6950.00 73.26 355.77 0.18 4446.19 4071.9 354.7 4054.52 N 375.54W 6975.00 72.76 355.79 1.98 4453.50 4095.8 354.7 4078.37 N 377.30W 7000.00 72.87 355.71 0.53 4460.89 4119.7 354.7 4102.19 N 379.07W 7025.00 72.86 355.73 0.09 4468.25 4143.5 354.7 4126.01 N 380.85W 7050.00 72.82 355.56 0.67 4475.63 4167.4 354.7 4149.83 N 382.67W • 7075.00 7100.00 73.10 355.45 1.18 4482.95 4191.3 354.7 4173.66 N 384.54W 72.68 355.12 2.09 4490.31 4215.2 354.7 4197.47 N 386.50W 7125.00 72.65 355.09 0.16 4497.76 4239.1 354.7 4221.25 N 388.54W 7150.00 72.48 355.12 0.68 4505.25 4262.9 354.7 4245.01 N 390.57W 7175.00 72.31 354.90 1.07 4512.81 4286.8 354.7 4268.75 N 392.65 W 7200.00 72.38 354.75 0.63 4520.39 4310.6 354.7 4292.48 N 394.80W 7225.00 72.19 354.57 1.03 4528.00 4334.4 354.7 4316.19 N 397.01 W 7250.00 72.31 354.45 0.66 4535.62 4358.2 354.7 4339.89 N 399.29 W 7275.00 72.13 354.45 0.71 4543.26 4382.0 354.7 4363.58 N 401.59W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413 GCM 129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 0 7300.00 72.05 354.36 0.47 4550.95 4405.8 354.7 4387.26 N 403.91 W 7325.00 72.35 354.49 1.31 4558.59 4429.6 354.7 4410.95 N 406.22W 7350.00 71.95 354.86 2.14 4566.25 4453.4 354.7 4434.64 N 408.43 W 7375.00 72.12 355.18 1.38 4573.96 4477.2 354.7 4458.33 N 410.50W 7400.00 72.19 355.55 1.44 4581.62 4501.0 354.7 4482.05 N 412.42W 7425.00 71.99 355.82 1.30 4589.31 4524.8 354.7 4505.77 N 414.21W 7450.00 71.91 355.77 0.36 4597.06 4548.5 354.8 4529.48 N 415.95W 7475.00 72.05 355.76 0.58 4604.79 4572.3 354.8 4553.19 N 417.71W 7500.00 71.77 355.67 1.19 4612.55 4596.1 354.8 4576.88 N 419.48W 7525.00 71.67 355.67 0.41 4620.40 4619.8 354.8 4600.55 N 421.28W 7550.00 71.55 356.02 1.40 4628.28 4643.5 354.8 4624.21 N 422.99W 7575.00 71.88 356.39 1.91 4636.13 4667.3 354.8 4647.90 N 424.57W 7600.00 72.05 356.63 1.13 4643.87 4691.0 354.8 4671.63 N 426.01 W • 7625.00 7650.00 71.88 356.68 0.68 4651.61 4714.8 354.8 4695.36 N 427.40W 71.99 356.59 0.56 4659.36 4738.5 354.8 4719.09 N 428.79 W 7675.00 71.65 356.56 1.39 4667.16 4762.3 354.8 4742.80 N 430.21 W 7700.00 71.81 356.60 0.65 4675.00 4786.0 354.8 4766.49 N 431.63 W 7725.00 71.46 356.64 1.40 4682.88 4809.7 354.8 4790.18 N 433.03 W 7750.00 71.68 356.89 1.31 4690.78 4833.4 354.8 4813.86 N 434.37 W 7775.00 71.97 357.03 1.28 4698.58 4857.2 354.9 4837.58 N 435.63 W 7800.00 71.59 357.16 1.61 4706.39 4880.9 354.9 4861.29 N 436.83 W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 7825.00 71.55 356.98 0.71 4714.30 4904.6 354.9 4884.98 N 438.04W 7850.00 71.51 356.83 0.59 4722.22 4928.3 354.9 4908.66 N 439.32W 1 7875.00 71.40 356.78 0.49 4730.17 4952.0 354.9 4932.32 N 440.64W 7900.00 71.56 356.62 0.90 4738.11 4975.7 354.9 4955.99 N 442.01 W 7925.00 71.76 356.50 0.92 4745.98 4999.4 354.9 4979.68 N 443.43 W 7950.00 72.30 356.48 2.14 4753.69 5023.2 354.9 5003.41 N 444.89W 7975.00 72.44 356.54 0.60 4761.26 5047.0 354.9 5027.19 N 446.34W 8000.00 72.39 356.60 0.30 4768.82 5070.8 354.9 5050.98 N 447.76W 8025.00 72.73 356.71 1.45 4776.31 5094.6 354.9 5074.79 N 449.16W 8050.00 73.05 356.77 1.28 4783.67 5118.5 355.0 5098.65 N 450.51W 8075.00 73.31 356.68 1.10 4790.90 5142.4 355.0 5122.54 N 451.88W 8100.00 73.25 356.63 0.31 4798.09 5166.4 355.0 5146.44 N 453.28 W 8125.00 73.01 356.63 0.97 4805.35 5190.3 355.0 5170.32 N 454.69W 8150.00 72.98 356.54 0.36 4812.66 5214.2 355.0 5194.19 N 456.11W • 8175.00 72.51 356.47 1.92 4820.08 5238.0 355.0 5218.02 N 457.56W 8200.00 72.40 356.59 0.64 4827.61 5261.9 355.0 5241.81 N 459.01 W 8225.00 72.62 356.69 0.97 4835.13 5285.7 355.0 5265.61 N 460.41 W 8250.00 72.68 356.73 0.28 4842.59 5309.6 355.0 5289.43 N 461.77W 8275.00 73.10 356.71 1.71 4849.94 5333.4 355.0 5313.29 N 463.14W 8300.00 72.75 356.66 1.45 4857.28 5357.3 355.0 5337.15 N 464.52W 8325.00 72.70 356.54 0.49 4864.71 5381.2 355.0 5360.98 N 465.94W 8350.00 72.45 356.56 1.03 4872.19 5405.0 355.0 5384.79 N 467.37W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. III 8375.00 72.21 356.57 0.96 4879.78 5428.8 355.0 5408.56 N 468.80 W 8400.00 72.63 356.47 1.73 4887.33 5452.7 355.1 5432.35 N 470.25 W 8425.00 72.71 356.71 0.97 4894.78 5476.5 355.1 5456.17 N 471.67W 8450.00 72.79 356.65 0.41 4902.20 5500.4 355.1 5480.01 N 473.05 W 8475.00 72.74 356.56 0.41 4909.60 5524.3 355.1 5503.85 N 474.46W 8500.00 72.41 356.46 1.36 4917.09 5548.1 355.1 5527.65 N 475.92 W 8525.00 72.68 356.33 1.20 4924.59 5571.9 355.1 5551.46 N 477.42W 8550.00 72.50 356.56 1.15 4932.07 5595.8 355.1 5575.26 N 478.90 W 8575.00 72.30 357.20 2.56 4939.63 5619.6 355.1 5599.06 N 480.19 W 8600.00 72.32 358.14 3.58 4947.22 5643.4 355.1 5622.86 N 481.16W 8625.00 72.35 358.59 1.72 4954.81 5667.2 355.1 5646.67 N 481.84W 8650.00 72.60 358.69 1.06 4962.34 5691.0 355.1 5670.50 N 482.41 W 8675.00 72.48 358.80 0.64 4969.84 5714.8 355.2 5694.34 N 482.93 W • 8700.00 72.93 359.22 2.42 4977.27 5738.6 355.2 5718.21 N 483.34W 8725.00 73.37 359.57 2.22 4984.52 5762.5 355.2 5742.14 N 483.59W 8750.00 73.25 359.57 0.48 4991.70 5786.3 355.2 5766.08 N 483.77W 8775.00 73.78 359.55 2.11 4998.79 5810.2 355.2 5790.05 N 483.96 W 8800.00 74.38 359.50 2.42 5005.65 5834.2 355.2 5814.09 N 484.16W 8825.00 75.08 359.66 2.84 5012.23 5858.3 355.3 5838.21 N 484.33 W 8850.00 75.27 0.17 2.12 5018.63 5882.4 355.3 5862.38 N 484.37W 8875.00 75.22 0.85 2.64 5025.00 5906.4 355.3 5886.55 N 484.15W 8900.00 75.46 1.04 1.21 5031.32 5930.5 355.3 5910.73 N 483.75 W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 9 8925.00 75.41 0.98 0.33 5037.61 5954.6 355.3 5934.93 N 483.33 W 8950.00 75.45 0.92 0.30 5043.90 5978.7 355.4 5959.12 N 482.93 W 8975.00 75.32 0.78 0.76 5050.21 6002.7 355.4 5983.31 N 482.57W 9000.00 74.95 0.64 1.57 5056.62 6026.8 355.4 6007.47 N 482.27W 9025.00 74.98 0.60 0.20 5063.10 6050.8 355.4 6031.61 N 482.01 W 9050.00 74.81 0.76 0.93 5069.62 6074.9 355.5 6055.75 N 481.72W 9075.00 74.82 1.63 3.36 5076.17 6098.9 355.5 6079.87 N 481.22W 9100.00 74.95 2.72 4.24 5082.69 6122.9 355.5 6103.99 N 480.30 W 9125.00 75.17 3.40 2.77 5089.13 6146.8 355.5 6128.11 N 479.01 W 9150.00 75.35 3.57 0.98 5095.49 6170.7 355.6 6152.24 N 477.54W 9175.00 75.16 3.50 0.80 5101.85 6194.7 355.6 6176.37 N 476.05 W 9200.00 75.21 3.48 0.19 5108.25 6218.6 355.6 6200.49 N 474.58 W 9225.00 74.95 3.45 1.04 5114.69 6242.6 355.7 6224.61 N 473.12W • 9250.00 9275.00 74.83 3.29 0.78 5121.20 6266.5 355.7 6248.70 N 471.70W 74.95 3.19 0.61 5127.72 6290.4 355.7 6272.80 N 470.34W 9300.00 74.63 3.04 1.38 5134.28 6314.3 355.7 6296.89 N 469.03 W 9325.00 74.53 2.93 0.58 5140.93 6338.2 355.8 6320.95 N 467.77W 9350.00 74.26 2.80 1.20 5147.65 6362.1 355.8 6345.00 N 466.57W 9375.00 74.02 2.67 1.07 5154.48 6386.0 355.8 6369.02 N 465.42W 9400.00 74.11 2.47 0.84 5161.35 6409.9 355.8 6393.04 N 464.34W 9425.00 73.78 2.32 1.42 5168.26 6433.7 355.9 6417.04 N 463.34W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 9450.00 73.84 2.22 0.44 5175.23 6457.6 355.9 6441.03 N 462.39 W 9475.00 73.62 2.09 1.00 5182.23 6481.5 355.9 6465.01 N 461.49W 9500.00 73.17 2.03 1.85 5189.38 6505.3 355.9 6488.96 N 460.62 W 9525.00 73.49 2.07 1.32 5196.55 6529.1 356.0 6512.89 N 459.77 W 9550.00 73.81 2.40 1.80 5203.59 6552.9 356.0 6536.86 N 458.83 W 9575.00 74.19 2.64 1.76 5210.48 6576.8 356.0 6560.87 N 457.78 W 9600.00 74.50 2.72 1.28 5217.23 6600.7 356.0 6584.91 N 456.65 W 9625.00 74.39 2.89 0.78 5223.93 6624.6 356.1 6608.97 N 455.47W 9650.00 74.96 3.47 3.20 5230.54 6648.6 356.1 6633.04 N 454.13W 9675.00 75.16 3.97 2.08 5236.98 6672.5 356.1 6657.15 N 452.57W 9700.00 74.65 4.03 2.06 5243.49 6696.4 356.1 6681.23 N 450.88 W 9725.00 74.98 4.04 1.34 5250.04 6720.3 356.2 6705.29 N 449.19W 9750.00 74.91 4.04 0.27 5256.53 6744.2 356.2 6729.38 N 447.48 W 9775.00 74.97 3.92 0.52 5263.03 6768.2 356.2 6753.46 N 445.81 W • 9800.00 74.65 3.83 1.34 5269.58 6792.1 356.3 6777.53 N 444.18 W 9825.00 74.66 3.75 0.31 5276.20 6816.0 356.3 6801.59 N 442.58 W 9850.00 74.41 3.60 1.14 5282.86 6839.9 356.3 6825.63 N 441.04W 9875.00 74.29 3.50 0.61 5289.60 6863.7 356.3 6849.66 N 439.55 W 9900.00 74.24 3.38 0.51 5296.38 6887.6 356.4 6873.68 N 438.11W 9925.00 74.03 3.34 0.88 5303.22 6911.5 356.4 6897.69 N 436.70 W 9950.00 73.64 3.17 1.69 5310.18 6935.3 356.4 6921.66 N 435.33W 9975.00 73.59 3.13 0.23 5317.23 6959.2 356.4 6945.61 N 434.01 W r A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK041.3GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 10000.00 73.40 3.16 0.78 5324.33 6983.0 356.4 6969.54 N 432.70W 10025.00 73.56 3.13 0.66 5331.44 7006.8 356.5 6993.47 N 431.38W 10050.00 73.35 3.09 0.87 5338.56 7030.6 356.5 7017.40 N 430.08 W 10075.00 73.24 3.02 0.51 5345.74 7054.4 356.5 7041.31 N 428.81 W 10100.00 73.23 3.04 0.08 5352.95 7078.1 356.5 7065.22 N 427.54 W 10125.00 72.98 2.90 1.17 5360.22 7101.9 356.6 7089.11 N 426.30 W 10150.00 73.14 2.83 0.69 5367.51 7125.7 356.6 7112.99 N 425.11W 10175.00 72.66 2.80 1.93 5374.86 7149.4 356.6 7136.86 N 423.93 W 10200.00 72.76 2.84 0.44 5382.29 7173.2 356.6 7160.70 N 422.76 W 10225.00 72.53 2.68 1.11 5389.75 7196.9 356.6 7184.53 N 421.61W 10250.00 72.26 2.51 1.26 5397.31 7220.6 356.7 7208.34 N 420.53 W 10275.00 72.47 2.44 0.92 5404.89 7244.3 356.7 7232.14 N 419.50W 10300.00 72.28 2.41 0.78 5412.45 7268.0 356.7 7255.94 N 418.50W 4111 10325.00 72.04 2.42 0.98 5420.11 7291.7 356.7 7279.72 N 417.49W 10350.00 72.12 2.34 0.44 5427.81 7315.4 356.7 7303.49 N 416.51 W 10375.00 71.76 2.29 1.46 5435.56 7339.0 356.8 7327.24 N 415.54W 10400.00 71.80 2.21 0.36 5443.37 7362.6 356.8 7350.96 N 414.61W 10425.00 71.82 2.06 0.57 5451.18 7386.3 356.8 7374.70 N 413.73W 10450.00 71.43 2.05 1.52 5459.06 7409.9 356.8 7398.41 N 412.88W 10475.00 71.57 1.90 0.79 5466.99 7433.5 356.8 7422.10 N 412.06W 10500.00 71.18 1.78 1.63 5474.97 7457.1 356.8 7445.78 N 411.30W 10525.00 71.42 1.67 1.03 5482.99 7480.7 356.9 7469.45 N 410.59W . • A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413 GCM 129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 10550.00 71.43 1.77 0.38 5490.95 7504.3 356.9 7493.14 N 409.88 W 10575.00 71.92 1.91 2.02 5498.81 7528.0 356.9 7516.86 N 409.11W 10600.00 72.15 1.92 0.92 5506.53 7551.7 356.9 7540.62 N 408.32W 10625.00 71.87 1.80 1.18 5514.25 7575.4 356.9 7564.39 N 407.55 W 10650.00 72.45 1.79 2.31 5521.91 7599.1 356.9 7588.18 N 406.80 W 10675.00 72.91 1.66 1.88 5529.35 7622.9 356.9 7612.03 N 406.08 W 10700.00 72.95 1.58 0.35 5536.69 7646.7 357.0 7635.92 N 405.41 W 10725.00 72.99 1.46 0.49 5544.01 7670.5 357.0 7659.82 N 404.77W 10750.00 72.71 1.28 1.32 5551.38 7694.3 357.0 7683.70 N 404.20 W 10775.00 72.85 1.09 0.92 5558.78 7718.1 357.0 7707.57 N 403.71 W 10800.00 72.60 0.99 1.07 5566.21 7742.0 357.0 7731.44 N 403.27W 10825.00 72.43 0.96 0.68 5573.72 7765.7 357.0 7755.28 N 402.87 W 10850.00 72.69 0.82 1.17 5581.21 7789.5 357.0 7779.13 N 402.50 W • 10875.00 72.15 0.63 2.27 5588.76 7813.3 357.0 7802.96 N 402.20 W 10900.00 72.40 0.47 1.17 5596.37 7837.1 357.1 7826.77 N 401.97 W 10925.00 72.26 0.58 0.72 5603.95 7860.9 357.1 7850.59 N 401.75W 10950.00 72.64 0.74 1.65 5611.49 7884.7 357.1 7874.43 N 401.48W 10975.00 72.87 0.79 0.93 5618.91 7908.5 357.1 7898.30 N 401.16W 11000.00 72.57 0.79 1.19 5626.33 7932.3 357.1 7922.17 N 400.83 W 11025.00 73.31 1.11 3.20 5633.67 7956.2 357.1 7946.07 N 400.43 W 11050.00 73.85 1.86 3.60 5640.73 7980.1 357.1 7970.04 N 399.81W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 11075.00 74.26 2.30 2.36 5647.60 8004.0 357.1 7994.06 N 398.94W 11100.00 74.47 2.20 0.92 5654.34 8028.0 357.2 8018.12 N 397.99W 11125.00 74.27 2.23 0.83 5661.07 8052.0 357.2 8042.18 N 397.06W 11150.00 74.50 2.25 0.93 5667.80 8076.0 357.2 8066.23 N 396.12W 11175.00 74.23 2.13 1.19 5674.54 8099.9 357.2 8090.29 N 395.20W 11200.00 73.93 1.98 1.30 5681.40 8123.9 357.2 8114.32 N 394.34W 11225.00 74.04 1.99 0.44 5688.29 8147.8 357.2 8138.33 N 393.51 W 11250.00 73.59 1.94 1.84 5695.26 8171.8 357.2 8162.33 N 392.68 W 11275.00 73.74 1.77 0.89 5702.30 8195.7 357.3 8186.31 N 391.91W 11300.00 73.43 1.67 1.30 5709.36 8219.6 357.3 8210.28 N 391.19W 11325.00 73.30 1.58 0.62 5716.52 8243.5 357.3 8234.22 N 390.51 W 11350.00 73.34 1.50 0.35 5723.70 8267.4 357.3 8258.16 N 389.86W 11375.00 73.12 1.40 0.95 5730.91 8291.2 357.3 8282.09 N 389.26 W 11400.00 73.36 1.22 1.17 5738.12 8315.1 357.3 8306.02 N 388.71W • 11425.00 73.24 1.17 0.51 5745.31 8339.0 357.3 8329.96 N 388.21W 11450.00 73.11 1.19 0.50 5752.54 8362.9 357.3 8353.88 N 387.72W 11475.00 73.31 1.10 0.85 5759.77 8386.8 357.4 8377.81 N 387.24W 11500.00 73.03 0.96 1.22 5767.00 8410.6 357.4 8401.74 N 386.81W 11525.00 73.16 0.64 1.33 5774.27 8434.5 357.4 8425.66 N 386.48W 11550.00 73.04 0.63 0.48 5781.54 8458.4 357.4 8449.58 N 386.21 W 11575.00 72.80 0.77 1.12 5788.88 8482.3 357.4 8473.47 N 385.92W 11600.00 73.11 0.95 1.43 5796.21 8506.1 357.4 8497.37 N 385.56W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413 GCM 129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. S 11625.00 72.85 0.85 1.10 5803.52 8530.0 357.4 8521.27 N 385.18W 11650.00 72.84 0.78 0.27 5810.90 8553.8 357.4 8545.16 N 384.84W 11675.00 72.73 0.62 0.76 5818.30 8577.7 357.4 8569.04 N 384.55 W 11700.00 72.37 0.43 1.59 5825.79 8601.5 357.4 8592.88 N 384.33 W 11725.00 72.68 0.37 1.23 5833.30 8625.3 357.4 8616.73 N 384.17W 11750.00 72.39 0.23 1.27 5840.81 8649.1 357.5 8640.58 N 384.04W 11775.00 72.26 0.41 0.85 5848.39 8672.9 357.5 8664.40 N 383.91 W 11800.00 72.65 0.78 2.09 5855.93 8696.7 357.5 8688.23 N 383.66W 11825.00 72.50 0.98 0.97 5863.42 8720.5 357.5 8712.08 N 383.30W 11850.00 72.72 0.91 0.90 5870.89 8744.3 357.5 8735.94 N 382.90 W 11875.00 72.72 1.11 0.76 5878.32 8768.2 357.5 8759.80 N 382.48 W 11900.00 72.67 1.64 2.03 5885.75 8792.0 357.5 8783.67 N 381.91W 11925.00 72.62 1.63 0.21 5893.21 8815.8 357.5 8807.52 N 381.23W • 11950.00 72.48 1.73 0.68 5900.70 8839.6 357.5 8831.36 N 380.53 W 11975.00 72.55 1.71 0.28 5908.22 8863.3 357.5 8855.19 N 379.81 W 12000.00 72.00 1.63 2.23 5915.83 8887.1 357.6 8878.99 N 379.12W 12025.00 71.88 1.37 1.10 5923.58 8910.8 357.6 8902.75 N 378.50 W 12050.00 72.00 1.41 0.52 5931.33 8934.5 357.6 8926.51 N 377.92W 12075.00 71.58 1.37 1.67 5939.14 8958.2 357.6 8950.26 N 377.34W 12100.00 71.60 1.34 0.14 5947.04 8981.9 357.6 8973.97 N 376.78 W 12125.00 71.29 1.20 1.36 5954.99 9005.5 357.6 8997.67 N 376.26W 12150.00 71.05 1.09 1.05 5963.06 9029.1 357.6 9021.32 N 375.79 W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 12175.00 71.17 1.08 0.48 5971.15 9052.8 357.6 9044.97 N 375.34 W 12200.00 70.80 0.99 1.51 5979.30 9076.4 357.6 9068.60 N 374.91 W 12225.00 70.73 0.90 0.46 5987.53 9099.9 357.6 9092.21 N 374.52W 12250.00 70.36 0.85 1.47 5995.86 9123.5 357.6 9115.78 N 374.16W 12275.00 70.42 1.24 1.49 6004.25 9147.0 357.7 9139.32 N 373.73 W 12300.00 70.51 1.27 0.36 6012.61 9170.5 357.7 9162.88 N 373.22 W 12325.00 70.41 1.43 0.71 6020.97 9194.0 357.7 9186.43 N 372.66W 12350.00 70.89 1.92 2.65 6029.25 9217.5 357.7 9210.01 N 371.97W 12375.00 71.09 2.17 1.25 6037.40 9241.1 357.7 9233.63 N 371.13W 12400.00 70.95 2.24 0.62 6045.52 9264.7 357.7 9257.25 N 370.22W 12425.00 71.07 2.31 0.53 6053.66 9288.2 357.7 9280.88 N 369.28 W 12450.00 70.77 2.33 1.18 6061.83 9311.8 357.7 9304.48 N 368.32W 12475.00 70.85 2.29 0.35 6070.05 9335.3 357.7 9328.08 N 367.37W • 12500.00 70.63 2.22 0.95 6078.29 9358.8 357.8 9351.66 N 366.44W 12525.00 70.43 2.25 0.78 6086.63 9382.3 357.8 9375.21 N 365.52 W 12550.00 70.53 2.11 0.66 6094.98 9405.8 357.8 9398.76 N 364.63 W 12575.00 70.13 2.04 1.64 6103.39 9429.3 357.8 9422.28 N 363.78 W 12600.00 70.15 1.91 0.50 6111.89 9452.8 357.8 9445.78 N 362.96W 12625.00 70.11 2.00 0.38 6120.39 9476.2 357.8 9469.28 N 362.16W 12650.00 69.86 1.90 1.05 6128.94 9499.6 357.8 9492.75 N 361.36W 12675.00 69.77 1.96 0.42 6137.57 9523.0 357.8 9516.21 N 360.57W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413 GCM 129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. 40 12700.00 69.58 1.85 0.89 6146.25 9546.4 357.8 9539.64 N 359.79 W 12725.00 69.60 1.76 0.35 6154.97 9569.8 357.8 9563.06 N 359.06W 12750.00 69.51 1.78 0.36 6163.70 9593.2 357.9 9586.47 N 358.33 W 12775.00 69.15 1.78 1.46 6172.53 9616.5 357.9 9609.85 N 357.61 W 12800.00 69.31 1.71 0.69 6181.39 9639.8 357.9 9633.21 N 356.89 W 12825.00 68.97 1.78 1.36 6190.30 9663.1 357.9 9656.56 N 356.18W 12850.00 68.79 1.67 0.82 6199.30 9686.4 357.9 9679.87 N 355.48 W 12875.00 68.71 1.55 0.56 6208.36 9709.7 357.9 9703.17 N 354.83 W 12900.00 68.55 1.47 0.72 6217.47 9732.9 357.9 9726.44 N 354.21 W 12925.00 68.60 1.39 0.37 6226.60 9756.1 357.9 9749.70 N 353.63 W 12950.00 68.35 1.37 1.02 6235.78 9779.3 357.9 9772.95 N 353.07 W 12975.00 68.02 1.31 1.35 6245.07 9802.5 357.9 9796.16 N 352.53 W 13000.00 67.87 1.11 0.96 6254.46 9825.6 357.9 9819.32 N 352.04W 13025.00 66.68 1.49 4.95 6264.11 9848.6 358.0 9842.37 N 351.52W . 13050.00 66.37 1.74 1.55 6274.07 9871.5 358.0 9865.30 N 350.87W 13075.00 66.34 1.53 0.78 6284.10 9894.4 358.0 9888.19 N 350.22W 13100.00 65.99 1.56 1.41 6294.20 9917.2 358.0 9911.05 N 349.60 W 13125.00 65.12 1.98 3.81 6304.55 9939.9 358.0 9933.80 N 348.90W 13150.00 64.07 1.66 4.37 6315.27 9962.5 358.0 9956.37 N 348.18W 13175.00 63.54 1.40 2.30 6326.31 9984.8 358.0 9978.79 N 347.58 W 13200.00 63.09 1.76 2.20 6337.54 10007.1 358.0 10001.12 N 346.97W 13225.00 61.85 2.17 5.19 6349.09 10029.3 358.0 10023.27 N 346.21 W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 13250.00 61.74 2.46 1.11 6360.91 10051.2 358.0 10045.29 N 345.32 W 13275.00 61.20 2.15 2.41 6372.85 10073.1 358.0 10067.23 N 344.43 W 13300.00 59.97 2.15 4.90 6385.13 10094.8 358.0 10088.99 N 343.62W 13325.00 58.92 2.52 4.39 6397.84 10116.3 358.1 10110.50 N 342.74W 13350.00 58.42 2.63 2.06 6410.84 10137.6 358.1 10131.84 N 341.78W 13375.00 58.49 2.31 1.12 6423.92 10158.8 358.1 10153.12 N 340.86W 13400.00 58.36 2.39 0.56 6437.01 10180.1 358.1 10174.40 N 339.99W 13425.00 57.63 2.94 3.48 6450.26 10201.2 358.1 10195.58 N 339.00W 13450.00 56.34 3.02 5.15 6463.88 10222.1 358.1 10216.52 N 337.91 W 13475.00 56.02 2.67 1.73 6477.79 10242.8 358.1 10237.26 N 336.88W 13500.00 56.33 2.86 1.40 6491.71 10263.5 358.1 10258.00 N 335.88W 13525.00 55.93 2.63 1.79 6505.64 10284.2 358.1 10278.74 N 334.89W 13550.00 54.85 2.50 4.35 6519.84 10304.7 358.1 10299.29 N 333.96 W 13575.00 53.88 2.99 4.18 6534.40 10325.0 358.2 10319.59 N 332.99W 13600.00 53.73 3.02 0.62 6549.17 10345.1 358.2 10339.74 N 331.93 W 13625.00 53.32 2.77 1.82 6564.03 10365.1 358.2 10359.81 N 330.92W 13650.00 51.93 2.83 5.57 6579.21 10384.9 358.2 10379.66 N 329.95W 13675.00 51.16 2.83 3.08 6594.75 10404.4 358.2 10399.21 N 328.98 W 13700.00 51.18 2.49 1.06 6610.43 10423.8 358.2 10418.66 N 328.08 W 13725.00 50.47 2.32 2.90 6626.22 10443.2 358.2 10438.03 N 327.26 W 13750.00 49.08 1.95 5.67 6642.37 10462.2 358.2 10457.10 N 326.55W 13775.00 48.63 1.95 1.80 6658.82 10481.0 358.2 10475.91 N 325.91 W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 13800.00 48.48 1.67 1.03 6675.37 10499.7 358.2 10494.64 N 325.32W 13825.00 47.55 1.44 3.79 6692.09 10518.2 358.2 10513.22 N 324.82W 13850.00 46.30 1.62 5.00 6709.16 10536.5 358.2 10531.47 N 324.33 W 13875.00 45.87 1.42 1.83 6726.50 10554.4 358.2 10549.48 N 323.85W 13900.00 45.89 1.20 0.64 6743.90 10572.4 358.2 10567.42 N 323.44W 13925.00 45.03 1.35 3.44 6761.44 10590.2 358.3 10585.23 N 323.04 W 13950.00 44.67 1.24 1.49 6779.16 10607.8 358.3 10602.86 N 322.65 W 13975.00 44.44 1.06 1.06 6796.98 10625.3 358.3 10620.40 N 322.29W 14000.00 44.36 1.10 0.33 6814.84 10642.8 358.3 10637.89 N 321.96W 14025.00 43.29 0.93 4.31 6832.88 10660.0 358.3 10655.19 N 321.66W 14050.00 42.62 0.92 2.67 6851.17 10677.1 358.3 10672.23 N 321.38W 14075.00 42.36 0.29 1.99 6869.61 10693.9 358.3 10689.11 N 321.20W 14100.00 42.09 0.70 1.54 6888.12 10710.7 358.3 10705.91 N 321.06W • 14125.00 41.88 0.80 0.91 6906.70 10727.4 358.3 10722.64 N 320.84W 14150.00 41.76 0.11 1.90 6925.34 10744.1 358.3 10739.30 N 320.71 W 14175.00 41.42 0.26 1.44 6944.03 10760.7 358.3 10755.90 N 320.65 W 14200.00 41.26 0.31 0.65 6962.80 10777.2 358.3 10772.41 N 320.57W 14225.00 41.10 0.06 0.91 6981.62 10793.6 358.3 10788.87 N 320.52W 14250.00 41.10 0.08 0.05 7000.46 10810.1 358.3 10805.30 N 320.50W 14275.00 40.66 0.38 1.94 7019.36 10826.4 358.3 10821.67 N 320.43 W 14300.00 39.77 0.58 3.58 7038.45 10842.5 358.3 10837.81 N 320.30W A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • 14325.00 38.64 0.62 4.54 7057.82 10858.3 358.3 10853.61 N 320.13W 14350.00 38.22 0.67 1.66 7077.41 10873.9 358.3 10869.15 N 319.96W 14375.00 38.10 0.64 0.51 7097.07 10889.3 358.3 10884.59 N 319.78W 14400.00 37.93 0.42 0.86 7116.76 10904.7 358.3 10899.99 N 319.64W 14425.00 37.84 0.48 0.37 7136.49 10920.0 358.3 10915.34 N 319.52W 14450.00 37.78 0.38 0.34 7156.24 10935.3 358.3 10930.67 N 319.40W 14475.00 37.59 0.34 0.80 7176.03 10950.6 358.3 10945.95 N 319.31W 14500.00 37.48 0.10 0.73 7195.85 10965.8 358.3 10961.18 N 319.25W 14525.00 37.49 359.96 0.35 7215.69 10981.0 358.3 10976.39 N 319.24W 14550.00 37.32 0.02 0.73 7235.55 10996.2 358.3 10991.58 N 319.24W 14575.00 36.55 0.60 3.36 7255.53 11011.2 358.3 11006.60 N 319.16W 14600.00 36.00 1.09 2.49 7275.69 11026.0 358.3 11021.39 N 318.94W 14625.00 35.89 1.09 0.45 7295.93 11040.7 358.3 11036.06 N 318.67W 14650.00 35.58 1.18 1.26 7316.22 11055.2 358.3 11050.66 N 318.38W • 14675.00 34.74 0.94 3.40 7336.66 11069.6 358.4 11065.05 N 318.11 W 14700.00 32.74 0.39 8.10 7357.45 11083.5 358.4 11078.94 N 317.95W 14725.00 30.61 359.41 8.75 7378.73 11096.6 358.4 11092.06 N 317.97W 14750.00 28.30 358.57 9.36 7400.49 11108.9 358.4 11104.35 N 318.18W 14775.00 26.28 357.78 8.23 7422.71 11120.4 358.4 11115.81 N 318.54W 14794.00 24.25 358.22 10.74 7439.89 11128.5 358.4 11123.91 N 318.83W Final Station Closure: Distance: 11128.48 ft Az: 358.36 deg. A Gyrodata Directional Survey BP EXPLORATION ALASKA INC Lease: MILNE POINT Well: MPF -70, 4 -1/2" TUBING Location: WELLHEAD, N. SLOPE BOROUGH Job Number: AK0413GCM129 MEASURED I N C L AZIMUTH DOGLEG VERTICAL CLOSURE HORIZONTAL DEPTH SEVERITY DEPTH DIST. AZIMUTH COORDINATES feet deg. deg. deg./ feet feet deg. feet 100 ft. • BP EXPLORATION ALASKA INC 06 Jun 11:25 Presented Survey Well: MILNE POINT MPF -70 4 -1/2" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM129 DEFINITIVE 70 - 1 60 • 50- z 0 - z 40- , J - V _ z I --r 30 • = BOTTOM HOLE LOCATED 20- MD: 14794.00 10 0 1 I r I I I I i I I I I I I i i I 1 I I I I i 0 2000 4000 6000 8000 10000 12000 14000 16000 MEASURED DEPTH (ft) BP EXPLORATION ALASKA INC 06 Jun 11:25 Presented Survey Well: MILNE POINT MPF -70 4-1/2" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM129 DEFINITIVE 0.0 OM HOLE LOCATED 1 MD 14794.00 • 340.0- I E 320.0 • N Q • • • 300.0 -- 280.0 fi 1 0 2000 4000 6000 8000 10000 12000 14000 16000 MEASURED DEPTH (ft) BP EXPLORATION ALASKA INC 06 Jun 11:26 Presented Survey Well: MILNE POINT MPF-70 4-1/2" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM129 DEFINITIVE - BOTTOM HOLE LOCATED 7000 MD: 14794.00 6000 Si 5000 a. 0 4000 c:4 3000 410 2000 1000 I I I I 1 I I I I I 0 2000 4000 6000 8000 10000 12000 14000 16000 MEASURED DEPTH (ft) BP EXPLORATION ALASKA INC 06 Jun 11:26 Presented Survey Well: MILNE POINT MPF -70 4 -1/2" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM129 DEFINITIVE 11 • BOTTOM HOLE LOCATED 10 MD 14794.00 9 - • 8 0 - 0 7 _ on - a) w - > - UJ 5 • • C7 - w O • 4 I • • • - • 1 lz\ilei I IillI, • ° ii, I I !.'!!,; I1r 11 .I , 11' ii I � I, I 1 r I 0 2000 4000 6000 8000 10000 12000 14000 16000 MEASURED DEPTH (ft) . BP EXPLORATION ALASKA INC 06 Jun 11:26 Presented Survey Well: MILNE POINT MPF -70 4 -1/2" TUBING Gyrodata Location: WELLHEAD, N. SLOPE BOROUGH AK0413GCM129 DEFINITIVE 11000 -- :OTT OM ROLE LOCATED MD: 14794.00 10000 90000 • 8000 -- 7000 - 0 - z 6000 z 5000 4000 - • 3000 - 2000 1000 -500 -450 -400 -350 -300 -250 -200 -150 -100 -50 0 EASTING (ft) • Survey QC - RGS- CTOecification Sheet SURVEY QUALITY CONTROL - SPECIFICATION DATA PRE-30B CALIBRATION VERIFICATION CHECK (ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg /min) 64 269.59 - 501.57 - 0.00012372 8.03 63 269.59 - 504.28 - 0.00012439 9.10 62 223.28 405.51 0.00010161 -6.46 61 223.27 402.23 0.00010079 -5.05 60 44.65 363.50 0.00009102 -1.94 59 44.65 366.45 0.00009176 -3.69 58 0.14 1796.57 0.00045633 2.66 57 0.14 1801.11 0.00045749 2.72 56 330.20 1491.27 0.00037593 -2.18 55 330.20 1495.34 0.00037696 -0.96 54 300.82 385.75 0.00009586 -0.15 53 300.82 387.84 0.00009638 1.34 52 270.77 - 478.77 - 0.00011810 -2.63 51 270.77 - 476.51 -0.00011754 -1.27 50 239.81 - 175.62 - 0.00004365 -6.11 49 239.81 - 175.20 - 0.00004355 -4.49 48 209.79 970.07 0.00024467 -6.33 47 209.79 964.58 0.00024328 -6.00 46 179.61 1826.12 0.00046385 -10.39 45 179.61 1828.69 0.00046451 -12.59 44 149.96 1514.26 0.00038171 -13.62 43 149.96 1510.99 0.00038088 -13.55 42 120.10 372.80 0.00009261 -10.92 41 120.11 377.14 0.00009369 -8.55 40 92.08 - 443.29 - 0.00010935 -10.22 39 92.08 - 441.61 - 0.00010894 -8.75 38 60.71 - 194.58 - 0.00004834 -2.23 37 60.71 - 197.28 - 0.00004902 -2.92 36 30.08 984.00 0.00024817 1.14 35 30.08 988.97 0.00024942 0.10 34 359.15 1852.46 0.00047056 -0.66 33 359.15 1863.17 0.00047329 -1.30 32 269.24 - 487.00 - 0.00012013 -5.26 31 269.24 - 484.96 - 0.00011963 -5.28 30 226.09 313.00 0.00007832 -8.45 29 226.09 316.71 0.00007925 -11.00 28 44.09 399.80 0.00010014 1.35 27 44.09 402.20 0.00010075 1.28 26 359.39 1839.53 0.00046727 1.98 25 359.39 1843.61 0.00046831 1.63 24 330.23 1523.68 0.00038413 -1.23 23 330.23 1523.86 0.00038418 -0.91 22 299.65 360.15 0.00008946 -2.76 21 299.65 360.59 0.00008957 -2.11 20 269.62 - 461.06 - 0.00011374 -5.21 19 269.62 - 455.26 - 0.00011231 -5.55 18 239.90 - 156.79 - 0.00003897 -4.82 17 239.90 - 155.16 - 0.00003856 -5.63 16 210.45 954.45 0.00024067 -9.29 15 210.45 958.92 0.00024179 -9.16 14 179.79 1809.98 0.00045974 -9.97 13 179.79 1809.38 0.00045959 -9.73 12 149.87 1514.27 0.00038170 -11.96 11 149.87 1517.25 0.00038245 -11.05 10 119.04 386.59 0.00009601 -10.23 9 119.04 385.06 0.00009563 -9.70 8 89.60 - 374.33 - 0.00009236 -8.46 7 89.60 - 370.43 - 0.00009140 -7.97 6 59.33 -88.28 - 0.00002195 -2.69 5 59.33 -82.20 - 0.00002044 -3.27 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 1 of 16 AK0413GCM129 Survey QC - RGS- CTeecification Sheet e • ♦ • 4, r,, 3 4 28.90 983.04 0.00024803 -1.14 3 28.90 987.54 0.00024916 -0.02 2 359.55 1714.18 0.00043532 2.00 1 359.55 1721.30 0.00043714 0.73 MBO = -0.39 Gravity Error = 638.59 Scale Factor Uncertainty = 0.00016193 Rate Error = -4.25 POST -30B CALIBRATION VERIFICATION CHECK (ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg /min) 25992 269.61 - 358.49 - 0.00008845 -8.11 25991 269.62 - 353.71 - 0.00008728 -7.30 25990 223.70 458.69 0.00011493 -7.37 25989 223.70 455.32 0.00011408 -8.56 25988 44.75 434.35 0.00010877 -4.56 25987 44.75 436.36 0.00010928 -7.21 25986 359.72 1819.53 0.00046217 -3.16 25985 359.72 1825.13 0.00046359 -2.18 25984 331.33 1570.30 0.00039609 -0.83 25983 331.33 1570.45 0.00039612 0.60 25982 299.57 430.87 0.00010703 -4.19 25981 299.57 431.66 0.00010723 -6.84 25980 270.31 - 355.39 - 0.00008769 -2.60 25979 270.31 - 347.02 - 0.00008563 -3.72 25978 238.89 -47.54 - 0.00001182 -6.95 25977 238.89 -49.37 - 0.00001228 -6.33 25976 209.33 1043.18 0.00026319 -8.19 25975 209.33 1040.68 0.00026256 -6.71 25974 189.58 25947.61 0.00691867 -90.85 25973 181.05 1825.26 0.00046364 -14.16 25972 181.05 1832.03 0.00046537 -15.38 25971 148.85 1541.03 0.00038830 -20.14 25970 148.85 1548.85 0.00039028 -22.37 25969 119.27 461.47 0.00011463 -19.93 25968 119.27 463.96 0.00011525 -20.27 25967 90.31 - 297.65 - 0.00007345 -14.73 25966 90.31 - 276.21 - 0.00006816 -15.89 25965 60.02 -19.66 - 0.00000489 -8.36 25964 60.02 -12.94 - 0.00000322 -11.36 25963 31.83 1001.21 0.00025235 -6.64 25962 31.83 1012.81 0.00025528 -9.44 25961 0.95 1890.91 0.00048038 -0.77 25960 0.95 1905.51 0.00048410 -3.86 25959 270.44 - 324.45 - 0.00008006 -6.54 25958 270.44 - 316.14 - 0.00007801 -6.15 25957 223.36 522.85 0.00013104 -20.63 25956 223.36 518.44 0.00012993 -24.90 25955 44.45 507.78 0.00012720 -8.74 25954 44.45 509.28 0.00012758 -8.08 25953 0.67 1874.31 0.00047615 1.28 25952 0.67 1876.37 0.00047667 -0.74 25951 330.13 1595.85 0.00040237 -2.72 25950 330.13 1601.50 0.00040380 -3.60 25949 300.64 522.52 0.00012988 -1.69 25948 300.64 523.88 0.00013021 -0.28 25947 270.53 - 285.99 - 0.00007058 -2.46 25946 270.53 - 282.03 - 0.00006960 -2.43 25945 239.44 -3.98 - 0.00000099 -4.28 25944 239.44 4.82 0.00000120 -6.25 25943 208.93 1103.42 0.00027846 -7.12 25942 208.94 1101.72 0.00027803 -6.88 25941 179.43 1887.79 0.00047957 -12.00 25940 179.43 1888.15 0.00047966 -11.09 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 2 of 16 AK0413GCM129 Survey QC - RGS- Cillecification Sheet e • • `' 0 0 ." 25939 149.48 1602.47 0.00040394 -15.60 25938 149.48 1607.17 0.00040513 -16.45 25937 119.58 536.49 0.00013330 -14.46 25936 119.59 532.38 0.00013228 -15.56 25935 89.04 - 234.84 - 0.00005796 -13.40 25934 89.04 - 221.17 - 0.00005459 -13.25 25933 58.83 58.63 0.00001459 -7.65 25932 58.83 60.20 0.00001498 -8.31 25931 30.88 1040.26 0.00026231 -1.21 25930 30.88 1050.25 0.00026483 -0.84 25929 0.09 1850.32 0.00047002 1.85 25928 0.09 1846.01 0.00046892 -1.22 MBO = -0.26 Gravity Error = 1128.98 Scale Factor Uncertainty = 0.00029109 Rate Error = -9.38 INITIALISATION Gyro Compass Reading / Station Raw Inclination Raw Azimuth Abs (ERMeas ERheo) 106 9.88 342.30 0.0331 107 9.88 342.33 0.0029 108 9.88 342.18 0.0227 109 9.88 342.42 0.0297 110 9.88 342.28 0.0099 111 9.88 342.16 0.0029 112 9.88 342.38 0.0332 Average 9.88 342.29 0.0192 Tolerance on Average* 0.0829 Standard Deviation 0.00 0.10 0.0137 Tolerance on St. Dev. ** 0.1 0.2 0.0399 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance = TBA * Tolerance on Average of earth horizontal rate difference is given by (1 /Cosl) * 4[(cosA *Sinl *0.1) +0.08 ° /hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1 /CosI) *J[(CosA *SinI *0.1) +(0.08 /(n -1))) 0 /hr DRIFT TUNES Drift Tune Ending Ending Ending Ending Residual Gx Bias Residual Gy Bias Number Time Depth Inclination Azimuth Start End Start End 1 512.94 2159.78 15.01 347.51 -0.001 -0.001 -0.001 -0.001 2 1412.82 4000.01 60.78 352.12 0.001 -0.003 -0.005 0.004 3 5804.50 13624.98 53.13 3.07 -0.027 0.023 0.001 -0.008 4 1420.37 14794.22 24.41 359.16 -0.009 0.009 0.002 -0.002 5 747.12 14300.03 38.07 0.71 0.019 -0.018 -0.002 0.002 6 878.61 13625.04 51.51 3.33 0.003 -0.002 0.001 0.001 7 1956.71 11799.99 72.56 1.43 0.007 -0.005 -0.000 0.004 8 1906.10 9400.02 73.95 2.73 0.008 -0.006 0.001 0.003 9 1881.40 6699.97 74.36 356.55 0.010 -0.008 0.000 0.004 10 1584.07 4500.06 72.81 353.12 0.006 -0.004 0.002 0.002 11 556.17 3994.20 61.88 351.98 0.001 -0.000 0.002 -0.000 12 1325.59 2160.08 16.03 348.46 0.014 -0.007 0.002 0.002 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 3 of 16 AK0413GCM129 Survey QC - RGS- CT1ecification Sheet 0 • it 0 r 13 454.51 I 1960.03 10.62 343.99 0.003 0.002 0.002 0.002 Average 0.003 -0.002 0.000 0.001 Standard Deviation 0.011 0.010 0.002 0.003 Tolerance for both the Average and the Standard Deviation 0.033 ° /hr 0.033° /hr 0.033 ° /hr 0.033 ° /hr INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * I Outrun * I Difference Inrun * I Outrun * I Difference 100.00 0.28 0.01 0.27 274.89 51.67 - 136.79 200.00 0.66 0.61 0.05 311.91 15.56 -63.64 300.00 0.80 1.06 -0.25 320.43 331.27 -10.84 400.00 1.01 1.05 -0.04 330.23 342.03 -11.81 500.00 1.20 1.12 0.07 333.99 352.28 -18.29 600.00 2.04 1.31 0.73 352.59 352.06 0.54 700.00 1.59 1.58 0.02 338.74 351.61 -12.87 800.00 2.17 2.02 0.15 342.55 352.13 -9.58 900.00 2.43 2.37 0.05 344.02 352.07 -8.05 1000.00 2.67 2.60 0.08 344.24 351.70 -7.46 1100.00 2.82 2.83 -0.01 342.75 350.08 -7.33 1200.00 3.32 3.24 0.08 339.93 345.43 -5.50 1300.00 4.14 4.07 0.07 338.48 342.56 -4.08 1400.00 5.19 4.93 0.25 339.18 341.77 -2.58 1500.00 5.75 5.76 -0.01 340.54 342.70 -2.16 1600.00 6.42 6.50 -0.08 342.37 342.98 -0.60 1700.00 7.30 7.32 -0.02 343.13 342.21 0.91 1800.00 7.49 7.63 -0.14 341.80 340.99 0.81 1900.00 8.77 8.65 0.12 340.44 341.77 -1.32 1925.00 9.23 9.07 0.16 341.20 342.31 -1.11 1950.00 9.69 9.55 0.14 342.07 342.77 -0.69 1975.00 10.11 10.11 0.00 342.31 343.41 -1.10 2000.00 11.06 10.70 0.36 343.38 344.03 -0.65 2025.00 11.58 11.26 0.32 344.02 344.51 -0.49 2050.00 11.76 11.69 0.08 344.24 345.08 -0.84 2075.00 12.56 12.12 0.45 345.29 345.53 -0.24 2100.00 13.28 13.11 0.17 346.45 346.62 -0.17 2125.00 13.99 13.79 0.20 346.80 347.29 -0.49 2150.00 14.66 14.26 0.40 347.27 347.50 -0.23 2175.00 15.50 15.10 0.40 347.81 347.93 -0.12 2200.00 16.89 16.25 0.64 348.79 348.67 0.12 2225.00 17.55 17.20 0.35 349.21 349.37 -0.16 2250.00 18.27 17.95 0.31 349.56 349.77 -0.21 2275.00 19.13 18.47 0.66 350.10 349.90 0.20 2300.00 19.86 19.59 0.27 350.42 350.69 -0.27 2325.00 20.46 20.15 0.31 350.59 350.67 -0.08 2350.00 20.80 20.53 0.27 350.67 350.81 -0.14 SURV -Q167 (OPS SUR -MA -003) 19` Nov 03 / Rev 15 Page 4 of 16 AK0413GCM129 Survey QC - RGS- CTiecification Sheet 11, gyroidata 2375.00 21.72 21.44 0.28 351.15 351.15 -0.01 2400.00 22.38 21.95 0.44 351.15 351.43 -0.28 2425.00 22.82 22.64 0.19 351.26 351.30 -0.04 2450.00 23.66 23.24 0.42 351.60 351.48 0.11 2475.00 24.14 23.92 0.22 351.77 351.71 0.06 2500.00 24.80 24.66 0.14 351.84 351.85 -0.01 2525.00 25.38 24.98 0.41 351.87 351.89 -0.02 2550.00 25.73 25.60 0.13 351.79 351.86 -0.08 2575.00 26.49 26.13 0.36 351.99 351.93 0.06 2600.00 26.84 26.61 0.23 351.98 352.03 -0.05 2625.00 27.45 27.29 0.16 352.18 352.16 0.03 2650.00 28.25 27.76 0.49 352.51 352.32 0.20 2675.00 28.99 28.74 0.25 353.05 352.91 0.14 2700.00 29.76 29.37 0.40 353.40 353.28 0.13 2725.00 30.28 29.96 0.32 353.53 353.43 0.10 2750.00 31.12 30.78 0.34 354.21 354.04 0.16 2775.00 31.67 31.30 0.38 354.51 354.30 0.21 2800.00 32.11 31.91 0.21 354.72 354.63 0.09 2825.00 33.04 32.62 0.42 354.83 354.68 0.15 2850.00 33.65 33.33 0.32 354.86 354.72 0.14 2875.00 34.44 34.22 0.22 354.86 354.74 0.12 2900.00 35.09 34.67 0.42 355.13 354.86 0.27 2925.00 35.57 35.37 0.19 355.32 355.24 0.08 2950.00 36.18 35.98 0.20 355.66 355.34 0.32 2975.00 36.47 36.29 0.19 355.70 355.50 0.20 3000.00 36.72 36.53 0.20 355.90 355.81 0.10 3025.00 37.01 36.81 0.19 355.96 355.91 0.04 3050.00 37.40 37.22 0.18 355.96 355.89 0.07 3075.00 38.01 37.82 0.20 355.96 355.85 0.10 3100.00 38.60 38.25 0.36 356.07 355.88 0.20 3125.00 39.33 39.07 0.25 356.10 355.95 0.14 3150.00 40.39 39.86 0.53 356.53 356.07 0.46 3175.00 40.99 40.69 0.30 356.72 356.60 0.13 3200.00 41.48 41.28 0.20 356.95 356.87 0.08 3225.00 41.97 41.77 0.20 356.96 356.86 0.10 3250.00 42.52 42.28 0.24 357.05 356.84 0.20 3275.00 43.07 42.84 0.23 357.01 357.00 0.01 3300.00 43.68 43.39 0.29 356.96 356.74 0.22 3325.00 44.35 44.01 0.34 357.00 356.80 0.20 3350.00 45.37 44.83 0.53 357.12 356.93 0.18 3375.00 46.03 45.70 0.34 357.18 356.88 0.29 3400.00 46.95 46.66 0.30 357.28 357.03 0.26 3425.00 47.72 47.30 0.42 357.36 357.04 0.33 3450.00 48.34 48.09 0.26 357.47 357.17 0.30 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 5 of 16 AK0413GCM129 1 Survey QC - RGS- CTOecification Sheet • gr 3475.00 48.85 48.65 0.20 357.66 357.33 0.33 3500.00 49.35 49.08 0.27 357.65 357.35 0.30 3525.00 49.79 49.51 0.27 357.40 357.10 0.30 3550.00 50.25 50.04 0.21 356.88 356.81 0.07 3575.00 50.64 50.46 0.18 356.23 356.00 0.23 3600.00 51.11 50.96 0.15 355.64 355.59 0.05 3625.00 51.65 51.40 0.25 355.24 354.99 0.25 3650.00 52.23 52.04 0.19 354.77 354.56 0.21 3675.00 52.69 52.52 0.17 354.49 354.32 0.17 3700.00 53.10 52.88 0.22 354.15 353.88 0.27 3725.00 53.85 53.56 0.29 353.56 353.55 0.02 3750.00 54.42 54.20 0.22 353.29 353.07 0.22 3775.00 54.85 54.69 0.16 352.85 352.77 0.08 3800.00 55.62 55.25 0.37 352.63 352.38 0.25 3825.00 56.37 56.13 0.24 352.22 351.94 0.28 3850.00 57.00 56.79 0.21 351.90 351.72 0.18 3875.00 57.59 57.33 0.26 351.87 351.60 0.27 3900.00 58.20 57.95 0.25 351.95 351.61 0.34 3925.00 59.10 58.63 0.47 352.07 351.61 0.46 3950.00 59.85 59.57 0.28 352.08 351.80 0.28 3975.00 60.45 60.16 0.29 352.11 351.79 0.31 4000.00 61.08 60.80 0.28 352.12 351.85 0.26 4025.00 61.96 61.66 0.30 352.26 351.99 0.27 4050.00 62.76 62.33 0.44 352.36 352.00 0.36 4075.00 63.46 63.03 0.43 352.39 352.12 0.27 4100.00 64.59 64.00 0.59 352.86 352.38 0.48 4125.00 65.36 64.92 0.44 353.00 352.69 0.31 4150.00 66.08 65.72 0.36 353.04 352.81 0.23 4175.00 66.62 66.36 0.26 353.06 352.83 0.23 4200.00 67.47 67.12 0.35 353.12 352.92 0.21 4225.00 68.28 67.86 0.42 353.12 352.88 0.23 4250.00 68.93 68.56 0.36 353.15 352.90 0.25 4275.00 69.57 69.22 0.35 353.11 352.92 0.19 4300.00 70.22 69.81 0.41 353.07 352.87 0.21 4325.00 70.71 70.34 0.37 353.05 352.81 0.24 4350.00 71.25 71.00 0.25 353.07 352.85 0.22 4375.00 71.77 71.44 0.33 353.08 352.88 0.20 4400.00 72.11 71.84 0.27 353.12 352.90 0.23 4425.00 72.52 72.32 0.21 353.18 352.98 0.20 4450.00 72.71 72.44 0.27 353.19 353.09 0.10 4475.00 72.42 72.55 -0.13 353.11 353.12 -0.00 4500.00 72.72 72.51 0.21 353.24 353.03 0.21 4525.00 72.77 72.49 0.28 353.32 353.15 0.17 4550.00 73.07 72.83 0.24 353.51 353.25 0.26 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 6 of 16 AK0413GCM129 Survey QC - RGS -CT ecification Sheet • ° ' + YQ 0 t I 4575.00 73.54 73.16 0.38 353.90 353.78 0.12 4600.00 73.99 73.55 0.44 354.57 354.21 0.35 4625.00 74.63 74.21 0.42 354.87 354.77 0.10 4650.00 74.90 74.42 0.48 355.31 355.10 0.21 4675.00 75.00 74.85 0.15 355.33 355.30 0.03 4700.00 75.04 74.71 0.33 355.36 355.36 -0.01 4725.00 74.69 74.59 0.10 355.25 355.35 -0.10 4750.00 74.47 74.37 0.09 355.13 355.18 -0.05 4775.00 73.94 73.78 0.15 355.17 355.16 0.01 4800.00 73.58 73.60 -0.02 355.38 355.25 0.12 4825.00 73.15 73.07 0.08 356.05 355.81 0.24 4850.00 72.95 72.85 0.10 356.53 356.34 0.19 4875.00 72.91 72.83 0.08 356.79 356.68 0.10 4900.00 72.62 72.37 0.26 357.48 357.22 0.26 4925.00 72.32 72.21 0.11 358.18 357.93 0.25 4950.00 72.53 72.31 0.23 358.61 358.52 0.10 4975.00 72.54 72.37 0.18 358.89 358.78 0.12 5000.00 72.43 72.31 0.12 358.92 358.86 0.06 5025.00 72.43 72.07 0.36 358.80 358.80 -0.00 5050.00 72.44 72.25 0.19 358.69 358.74 -0.05 5075.00 72.42 72.15 0.26 358.56 358.57 -0.01 5100.00 72.23 71.96 0.28 358.51 358.46 0.05 5125.00 72.17 72.16 0.01 358.48 358.43 0.05 5150.00 72.07 71.97 0.10 358.46 358.41 0.05 5175.00 71.94 71.99 -0.05 358.45 358.42 0.03 5200.00 71.94 71.91 0.03 358.33 358.34 -0.02 5225.00 71.78 71.82 -0.04 358.36 358.25 0.12 5250.00 71.96 71.88 0.08 358.41 358.29 0.12 5275.00 71.92 71.78 0.14 358.42 358.44 -0.02 5300.00 71.96 71.96 0.00 358.47 358.39 0.07 5325.00 71.94 71.88 0.06 358.47 358.43 0.04 5350.00 71.75 71.81 -0.06 358.44 358.44 -0.01 5375.00 71.89 71.74 0.15 358.41 358.35 0.06 5400.00 71.96 71.77 0.19 358.42 358.40 0.02 5425.00 71.75 71.92 -0.17 358.37 358.38 -0.01 5450.00 71.70 71.64 0.06 358.41 358.31 0.10 5475.00 71.80 71.66 0.15 358.39 358.34 0.05 5500.00 72.39 72.04 0.36 358.45 358.32 0.13 5525.00 72.77 72.43 0.34 358.45 358.30 0.15 5550.00 72.95 72.89 0.06 358.46 358.35 0.11 5575.00 72.89 72.80 0.09 358.51 358.42 0.09 5600.00 72.48 72.45 0.02 358.53 358.46 0.07 5625.00 72.69 72.47 0.22 358.60 358.42 0.18 5650.00 72.54 72.38 0.16 358.67 358.49 0.18 5675.00 72.64 72.50 0.14 358.54 358.43 0.11 SURV -Q167 (OPS SUR -MA -003) 19` Nov 03 / Rev 15 Page 7 of 16 AK0413GCM129 Survey QC - RGS- CTTecification Sheet • • * ' , I - % 5700.00 72.85 72.57 0.28 358.22 358.07 0.15 5725.00 72.79 72.62 0.17 357.70 357.61 0.09 5750.00 72.82 72.62 0.20 357.41 357.27 0.14 5775.00 72.56 72.35 0.21 357.29 357.09 0.20 5800.00 72.56 72.46 0.09 357.31 357.14 0.17 5825.00 72.51 72.28 0.22 357.18 357.09 0.09 5850.00 72.16 71.96 0.20 356.97 356.92 0.04 5875.00 72.41 72.15 0.26 356.70 356.66 0.05 5900.00 72.71 72.33 0.39 356.51 356.45 0.05 5925.00 72.80 72.75 0.05 356.53 356.42 0.11 5950.00 72.74 72.51 0.23 356.58 356.43 0.16 1 5975.00 72.94 72.52 0.42 356.70 356.57 0.13 6000.00 73.57 73.14 0.42 356.75 356.61 0.14 6025.00 74.02 73.57 0.45 356.78 356.69 0.09 6050.00 74.34 74.01 0.33 356.67 356.64 0.03 6075.00 74.93 74.53 0.40 356.65 356.55 0.10 6100.00 75.58 75.18 0.40 356.47 356.33 0.14 6125.00 75.70 75.67 0.02 356.35 356.23 0.12 6150.00 75.52 75.49 0.03 356.21 356.15 0.06 6175.00 75.46 75.36 0.10 356.25 356.13 0.12 6200.00 75.88 75.62 0.26 356.26 356.06 0.20 6225.00 75.52 75.31 0.22 356.20 356.04 0.16 6250.00 75.41 75.26 0.15 356.16 355.98 0.18 6275.00 75.46 75.18 0.28 356.17 355.99 0.19 6300.00 75.17 75.12 0.04 356.17 356.04 0.13 6325.00 75.38 75.17 0.21 356.18 355.86 0.31 6350.00 75.08 74.85 0.23 356.02 355.85 0.17 6375.00 75.09 74.97 0.11 355.99 355.78 0.21 6400.00 75.34 74.98 0.36 356.01 355.75 0.26 6425.00 75.04 75.00 0.04 355.89 355.72 0.18 6450.00 75.19 74.98 0.21 355.87 355.60 0.27 6475.00 74.77 74.55 0.23 355.74 355.49 0.25 6500.00 74.71 74.69 0.02 355.68 355.55 0.13 6525.00 74.96 74.59 0.37 355.74 355.38 0.36 6550.00 74.46 74.43 0.03 355.56 355.35 0.22 6575.00 74.71 74.42 0.29 355.60 355.27 0.33 6600.00 74.61 74.12 0.49 355.86 355.46 0.40 6625.00 74.75 74.51 0.24 356.27 355.77 0.49 6650.00 74.97 74.49 0.48 356.79 356.40 0.39 6675.00 74.56 74.40 0.17 356.98 356.68 0.30 6700.00 74.62 74.45 0.18 356.96 356.73 0.23 6725.00 74.55 74.07 0.49 356.85 356.66 0.19 6750.00 74.36 74.24 0.12 356.76 356.55 0.22 6775.00 74.53 74.15 0.37 356.64 356.38 0.26 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 8 of 16 AK0413GCM129 r Survey QC - RGS -CT • cification • Sheet • • - ,. I. 4 - 6800.00 74.13 73.89 0.24 356.58 356.34 0.24 6825.00 74.11 73.92 0.20 356.60 356.39 0.20 6850.00 73.84 73.45 0.39 356.54 356.29 0.25 6875.00 73.50 73.40 0.10 356.49 356.21 0.28 6900.00 73.64 73.30 0.35 356.42 356.15 0.27 6925.00 73.46 73.21 0.25 356.36 356.08 0.28 6950.00 73.50 73.26 0.24 356.33 356.06 0.27 6975.00 73.04 72.76 0.28 356.35 356.10 0.25 7000.00 73.05 72.87 0.18 356.24 356.04 0.20 7025.00 73.15 72.86 0.28 356.29 356.03 0.26 7050.00 73.11 72.82 0.28 356.09 355.89 0.20 7075.00 73.40 73.10 0.31 355.95 355.82 0.13 7100.00 72.83 72.68 0.15 355.65 355.44 0.21 7125.00 72.66 72.65 0.01 355.64 355.40 0.24 7150.00 72.90 72.48 0.42 355.62 355.47 0.15 7175.00 72.58 72.31 0.27 355.41 355.26 0.14 7200.00 72.68 72.38 0.30 355.29 355.06 0.23 7225.00 72.61 72.19 0.42 355.12 354.88 0.25 7250.00 72.44 72.31 0.13 354.97 354.80 0.17 7275.00 72.59 72.13 0.46 354.93 354.83 0.10 7300.00 72.40 72.05 0.35 354.87 354.72 0.16 7325.00 72.53 72.35 0.18 355.08 354.76 0.32 7350.00 72.38 71.95 0.43 355.34 355.24 0.11 7375.00 72.26 72.12 0.15 355.75 355.48 0.27 7400.00 72.44 72.19 0.26 356.08 355.90 0.17 7425.00 72.24 71.99 0.25 356.30 356.20 0.10 7450.00 72.23 71.91 0.32 356.23 356.18 0.05 7475.00 72.22 72.05 0.17 356.23 356.16 0.07 7500.00 72.00 71.77 0.23 356.12 356.08 0.04 7525.00 71.86 71.67 0.19 356.11 356.09 0.02 7550.00 72.00 71.55 0.45 356.54 356.37 0.17 7575.00 72.29 71.88 0.41 356.88 356.77 0.11 7600.00 72.36 72.05 0.31 357.10 357.01 0.09 7625.00 72.05 71.88 0.17 357.10 357.12 -0.01 7650.00 72.35 71.99 0.35 357.07 356.97 0.10 7675.00 71.93 71.65 0.29 357.02 356.97 0.05 7700.00 71.94 71.81 0.14 357.03 357.03 0.00 7725.00 71.93 71.46 0.47 357.11 357.03 0.08 7750.00 72.05 71.68 0.37 357.40 357.24 0.16 7775.00 72.28 71.97 0.31 357.49 357.44 0.05 7800.00 72.00 71.59 0.41 357.58 357.60 -0.03 7825.00 71.74 71.55 0.19 357.37 357.46 -0.09 7850.00 71.77 71.51 0.26 357.24 357.28 -0.04 7875.00 71.66 71.40 0.26 357.16 357.26 -0.10 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 9 of 16 AK0413GCM129 Survey QC - RGS -CT Specification Sheet • r i `,?` t t°; 7900.00 71.98 71.56 0.42 357.04 357.06 -0.03 7925.00 72.29 71.76 0.53 356.95 356.91 0.04 7950.00 72.72 72.30 0.42 356.90 356.92 -0.02 7975.00 72.78 72.44 0.34 356.97 356.97 -0.00 8000.00 72.81 72.39 0.43 357.11 356.95 0.16 8025.00 73.16 72.73 0.42 357.17 357.12 0.05 8050.00 73.55 73.05 0.51 357.24 357.18 0.06 8075.00 73.58 73.31 0.27 357.05 357.18 -0.13 8100.00 73.54 73.25 0.29 357.05 357.07 -0.02 8125.00 73.36 73.01 0.35 357.08 357.04 0.04 8150.00 73.30 72.98 0.32 356.96 357.00 -0.04 8175.00 72.83 72.51 0.32 356.89 356.90 -0.01 8200.00 72.73 72.40 0.33 357.01 357.05 -0.04 8225.00 73.12 72.62 0.50 357.16 357.08 0.08 8250.00 73.12 72.68 0.44 357.17 357.14 0.03 8275.00 73.42 73.10 0.32 357.15 357.12 0.03 8300.00 73.06 72.75 0.31 357.07 357.11 -0.04 8325.00 72.96 72.70 0.26 356.99 356.96 0.03 8350.00 72.90 72.45 0.45 357.01 356.96 0.05 8375.00 72.72 72.21 0.51 357.02 356.99 0.04 8400.00 72.97 72.63 0.35 356.93 356.86 0.07 8425.00 73.28 72.71 0.57 357.17 357.12 0.05 8450.00 73.00 72.79 0.21 357.07 357.09 -0.02 8475.00 73.14 72.74 0.40 357.01 356.97 0.05 8500.00 72.84 72.41 0.43 356.87 356.91 -0.04 8525.00 73.02 72.68 0.33 356.75 356.76 -0.01 8550.00 72.96 72.50 0.46 357.07 356.92 0.15 8575.00 72.61 72.30 0.31 357.75 357.53 0.21 8600.00 72.92 72.32 0.60 358.65 358.50 0.15 8625.00 72.91 72.35 0.56 359.03 359.01 0.02 8650.00 73.02 72.60 0.42 359.07 359.16 -0.10 8675.00 73.13 72.48 0.65 359.25 359.20 0.05 8700.00 73.42 72.93 0.49 359.72 359.58 0.14 8725.00 73.96 73.37 0.59 0.01 0.00 0.01 8750.00 73.83 73.25 0.57 359.96 0.04 -0.08 8775.00 74.37 73.78 0.59 359.94 0.03 -0.09 8800.00 75.15 74.38 0.77 359.97 359.89 0.09 8825.00 75.49 75.08 0.41 0.15 0.04 0.11 8850.00 75.84 75.27 0.57 0.65 0.56 0.10 8875.00 75.70 75.22 0.47 1.36 1.20 0.17 8900.00 75.90 75.46 0.44 1.45 1.49 -0.04 8925.00 75.93 75.41 0.52 1.40 1.41 -0.01 8950.00 75.69 75.45 0.24 1.33 1.37 -0.04 8975.00 75.70 75.32 0.38 1.15 1.27 -0.12 SURV -Q167 (OPS SUR -MA -003) 19` Nov 03 / Rev 15 Page 10 of 16 AK0413GCM129 a 0 • Survey QC - RGS -CT Specification Sheet 9000.00 75.38 74.95 0.43 1.02 1.13 -0.11 9025.00 75.38 74.98 0.39 0.96 1.11 -0.15 9050.00 75.33 74.81 0.52 1.20 1.20 -0.00 9075.00 75.23 74.82 0.41 2.26 1.89 0.37 9100.00 75.51 74.95 0.56 3.22 3.10 0.13 9125.00 75.62 75.17 0.45 3.87 3.80 0.07 9150.00 75.73 75.35 0.38 3.95 4.05 -0.11 9175.00 75.72 75.16 0.56 3.93 3.94 -0.01 9200.00 75.50 75.21 0.30 3.87 3.97 -0.09 9225.00 75.31 74.95 0.36 3.82 3.94 -0.12 9250.00 75.20 74.83 0.37 3.67 3.79 -0.12 9275.00 75.23 74.95 0.28 3.60 3.63 -0.03 9300.00 75.15 74.63 0.51 3.47 3.46 0.01 9325.00 74.82 74.53 0.29 3.29 3.43 -0.14 9350.00 74.61 74.26 0.35 3.20 3.27 -0.07 9375.00 74.38 74.02 0.36 3.05 3.14 -0.09 9400.00 74.42 74.11 0.31 2.83 2.96 -0.13 9425.00 74.27 73.78 0.49 2.70 2.81 -0.11 9450.00 74.08 73.84 0.24 2.57 2.73 -0.16 9475.00 73.90 73.62 0.28 2.47 2.57 -0.10 9500.00 73.56 73.17 0.40 2.43 2.49 -0.06 9525.00 73.97 73.49 0.48 2.49 2.50 -0.01 9550.00 74.40 73.81 0.59 2.84 2.83 0.01 9575.00 74.67 74.19 0.49 3.05 3.09 -0.04 9600.00 74.86 74.50 0.37 3.10 3.19 -0.09 9625.00 74.87 74.39 0.48 3.31 3.34 -0.02 9650.00 75.46 74.96 0.49 3.99 3.83 0.16 9675.00 75.45 75.16 0.29 4.42 4.38 0.04 9700.00 75.06 74.65 0.41 4.46 4.48 -0.02 9725.00 75.31 74.98 0.33 4.48 4.47 0.01 9750.00 75.18 74.91 0.27 4.45 4.49 -0.04 9775.00 75.32 74.97 0.34 4.31 4.38 -0.07 9800.00 75.04 74.65 0.39 4.27 4.26 0.01 9825.00 74.89 74.66 0.23 4.12 4.22 -0.10 9850.00 74.79 74.41 0.38 4.00 4.06 -0.06 9875.00 74.61 74.29 0.32 3.87 4.00 -0.13 9900.00 74.55 74.24 0.30 3.80 3.83 -0.04 9925.00 74.45 74.03 0.42 3.72 3.82 -0.10 9950.00 73.92 73.64 0.28 3.58 3.62 -0.04 9975.00 74.02 73.59 0.42 3.56 3.57 -0.01 10000.00 73.77 73.40 0.37 3.58 3.61 -0.04 10025.00 73.84 73.56 0.27 3.54 3.59 -0.05 10050.00 73.70 73.35 0.35 3.53 3.51 0.02 10075.00 73.49 73.24 0.25 3.39 3.50 -0.10 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 11 of 16 AK0413GCM129 . • Survey QC - RGS -CT Specification Sheet • greidata 10100.00 73.70 73.23 0.46 3.44 3.50 -0.06 10125.00 73.29 72.98 0.31 3.31 3.35 -0.04 10150.00 73.37 73.14 0.24 3.22 3.29 -0.08 10175.00 73.04 72.66 0.39 3.18 3.29 -0.10 10200.00 72.86 72.76 0.11 3.15 3.40 -0.25 10225.00 72.97 72.53 0.45 3.08 3.13 -0.05 10250.00 72.63 72.26 0.38 2.89 2.99 -0.10 10275.00 72.73 72.47 0.26 2.80 2.94 -0.14 10300.00 72.58 72.28 0.29 2.77 2.92 -0.15 10325.00 72.28 72.04 0.24 2.78 2.93 -0.16 10350.00 72.39 72.12 0.27 2.72 2.82 -0.10 10375.00 72.15 71.76 0.40 2.69 2.77 -0.08 10400.00 72.02 71.80 0.21 2.55 2.74 -0.19 10425.00 72.20 71.82 0.39 2.45 2.53 -0.08 10450.00 71.65 71.43 0.21 2.38 2.59 -0.22 10475.00 71.90 71.57 0.33 2.28 2.38 -0.10 10500.00 71.54 71.18 0.36 2.14 2.28 -0.14 10525.00 71.58 71.42 0.16 2.07 2.14 -0.08 10550.00 72.03 71.43 0.60 2.18 2.23 -0.05 10575.00 72.24 71.92 0.32 2.31 2.37 -0.06 10600.00 72.34 72.15 0.20 2.26 2.43 -0.17 10625.00 72.32 71.87 0.45 2.16 2.31 -0.15 10650.00 72.80 72.45 0.35 2.15 2.29 -0.14 10675.00 73.36 72.91 0.45 1.99 2.18 -0.19 10700.00 73.11 72.95 0.16 1.93 2.09 -0.16 10725.00 73.25 72.99 0.25 1.86 1.92 -0.06 10750.00 73.01 72.71 0.30 1.64 1.78 -0.14 10775.00 72.90 72.85 0.05 1.44 1.60 -0.16 10800.00 72.95 72.60 0.35 1.36 1.48 -0.12 10825.00 72.67 72.43 0.24 1.34 1.45 -0.12 10850.00 72.94 72.69 0.24 1.17 1.32 -0.15 10875.00 72.48 72.15 0.32 1.00 1.12 -0.12 10900.00 72.49 72.40 0.09 0.81 0.99 -0.18 10925.00 72.71 72.26 0.45 0.95 1.08 -0.13 10950.00 72.87 72.64 0.23 1.15 1.19 -0.04 10975.00 73.13 72.87 0.26 1.15 1.29 -0.14 11000.00 73.03 72.57 0.46 1.17 1.27 -0.09 11025.00 73.63 73.31 0.32 1.53 1.57 -0.04 11050.00 74.45 73.85 0.59 2.32 2.28 0.04 11075.00 74.50 74.26 0.24 2.64 2.83 -0.19 11100.00 74.80 74.47 0.32 2.56 2.71 -0.15 11125.00 74.61 74.27 0.34 2.63 2.70 -0.07 11150.00 74.63 74.50 0.14 2.64 2.72 -0.09 11175.00 74.49 74.23 0.26 2.45 2.67 -0.22 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 12 of 16 AK0413GCM129 Survey QC - RGS -CT Specification Sheet • • • 1 - 11200.00 74.12 73.93 0.19 2.35 2.49 -0.14 11225.00 74.30 74.04 0.26 2.35 2.49 -0.14 11250.00 73.89 73.59 0.30 2.28 2.47 -0.19 11275.00 73.79 73.74 0.05 2.11 2.31 -0.20 11300.00 73.74 73.43 0.32 2.05 2.15 -0.10 11325.00 73.46 73.30 0.17 1.94 2.10 -0.16 11350.00 73.62 73.34 0.28 1.86 2.00 -0.13 11375.00 73.37 73.12 0.25 1.75 1.91 -0.16 11400.00 73.42 73.36 0.06 1.57 1.73 -0.16 11425.00 73.49 73.24 0.26 1.55 1.64 -0.09 11450.00 73.26 73.11 0.15 1.55 1.69 -0.15 11475.00 73.51 73.31 0.20 1.49 1.58 -0.09 11500.00 73.33 73.03 0.29 1.33 1.45 -0.12 11525.00 73.25 73.16 0.09 1.00 1.15 -0.15 11550.00 73.23 73.04 0.18 1.06 1.07 -0.01 11575.00 73.01 72.80 0.21 1.22 1.19 0.03 11600.00 73.20 73.11 0.09 1.34 1.43 -0.08 11625.00 73.08 72.85 0.23 1.22 1.34 -0.12 11650.00 72.89 72.84 0.05 1.14 1.28 -0.15 11675.00 72.96 72.73 0.23 0.97 1.13 -0.16 11700.00 72.54 72.37 0.17 0.82 0.90 -0.08 11725.00 72.68 72.68 0.01 0.76 0.84 -0.08 11750.00 72.59 72.39 0.20 0.65 0.68 -0.03 11775.00 72.37 72.26 0.10 0.82 0.87 -0.06 11800.00 72.90 72.65 0.26 1.24 1.19 0.05 11825.00 72.77 72.50 0.26 1.38 1.45 -0.07 11850.00 72.82 72.72 0.11 1.30 1.38 -0.08 11875.00 73.05 72.72 0.32 1.62 1.49 0.12 11900.00 72.73 72.67 0.06 2.05 2.09 -0.04 11925.00 72.79 72.62 0.17 2.01 2.12 -0.10 11950.00 72.69 72.48 0.21 2.13 2.18 -0.05 11975.00 72.47 72.55 -0.07 2.06 2.21 -0.15 12000.00 72.17 72.00 0.17 2.00 2.13 -0.13 12025.00 71.89 71.88 0.01 1.75 1.86 -0.11 12050.00 72.18 72.00 0.18 1.79 1.88 -0.09 12075.00 71.83 71.58 0.25 1.79 1.81 -0.02 12100.00 71.44 71.60 -0.17 1.70 1.83 -0.14 12125.00 71.54 71.29 0.24 1.61 1.66 -0.05 12150.00 71.08 71.05 0.03 1.48 1.57 -0.08 12175.00 71.23 71.17 0.06 1.49 1.53 -0.04 12200.00 70.94 70.80 0.14 1.41 1.44 -0.03 12225.00 70.72 70.73 -0.00 1.29 1.38 -0.08 12250.00 70.44 70.36 0.08 1.23 1.33 -0.09 12275.00 70.55 70.42 0.13 1.62 1.72 -0.10 12300.00 70.60 70.51 0.09 1.68 1.73 -0.06 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 13 of 16 AK0413GCM129 , • Survey QC - RGS -CT Specification Sheet gy 12325.00 70.58 70.41 0.17 1.84 1.88 -0.04 12350.00 71.04 70.89 0.15 2.38 2.34 0.04 12375.00 71.24 71.09 0.15 2.55 2.66 -0.11 12400.00 71.29 70.95 0.34 2.61 2.74 -0.13 12425.00 71.44 71.07 0.37 2.69 2.79 -0.10 12450.00 71.16 70.77 0.39 2.72 2.80 -0.08 12475.00 71.14 70.85 0.28 2.69 2.76 -0.08 12500.00 70.91 70.63 0.29 2.58 2.72 -0.13 12525.00 70.70 70.43 0.27 2.62 2.74 -0.13 12550.00 70.86 70.53 0.33 2.51 2.58 -0.07 12575.00 70.49 70.13 0.36 2.41 2.53 -0.13 12600.00 70.29 70.15 0.15 2.25 2.44 -0.19 12625.00 70.43 70.11 0.33 2.40 2.47 -0.07 12650.00 70.15 69.86 0.29 2.26 2.41 -0.15 12675.00 69.99 69.77 0.21 2.31 2.48 -0.17 12700.00 69.90 69.58 0.33 2.21 2.37 -0.16 12725.00 69.77 69.60 0.17 2.12 2.27 -0.15 12750.00 69.86 69.51 0.35 2.15 2.27 -0.12 12775.00 69.42 69.15 0.27 2.15 2.28 -0.13 12800.00 69.46 69.31 0.15 2.07 2.20 -0.13 12825.00 69.25 68.97 0.28 2.13 2.28 -0.14 12850.00 68.88 68.79 0.08 1.98 2.20 -0.22 12875.00 68.98 68.71 0.27 1.92 2.04 -0.11 12900.00 68.85 68.55 0.30 1.86 1.93 -0.07 12925.00 68.69 68.60 0.09 1.74 1.90 -0.16 12950.00 68.63 68.35 0.28 1.76 1.84 -0.08 12975.00 68.18 68.02 0.16 1.64 1.83 -0.19 13000.00 67.93 67.87 0.07 1.47 1.60 -0.13 13025.00 66.91 66.68 0.23 1.95 1.92 0.03 13050.00 66.45 66.37 0.09 2.11 2.25 -0.14 13075.00 66.62 66.34 0.27 1.89 2.04 -0.15 13100.00 66.12 65.99 0.13 1.98 2.03 -0.04 13125.00 65.07 65.12 -0.05 2.33 2.50 -0.17 13150.00 64.05 64.07 -0.01 1.96 2.22 -0.26 13175.00 63.69 63.54 0.15 1.75 1.93 -0.18 13200.00 63.07 63.09 -0.02 2.11 2.27 -0.16 13225.00 61.97 61.85 0.12 2.56 2.66 -0.10 13250.00 61.93 61.74 0.19 2.87 2.91 -0.04 13275.00 61.16 61.20 -0.04 2.48 2.67 -0.19 13300.00 59.81 59.97 -0.16 2.51 2.66 -0.16 13325.00 58.93 58.92 0.01 2.86 3.05 -0.19 13350.00 58.59 58.42 0.17 2.95 3.16 -0.21 13375.00 58.56 58.49 0.07 2.63 2.86 -0.24 13400.00 58.51 58.36 0.15 2.79 2.88 -0.09 SURV -Q167 (OPS SUR -MA -003) 19`" Nov 03 / Rev 15 Page 14 of 16 AK0413GCM129 • * 0 0 t--- Survey QC - RGS -CT Specification Sheet 13425.00 57.45 57.63 -0.18 3.33 3.43 -0.10 13450.00 56.22 56.34 -0.12 3.27 3.63 -0.36 13475.00 56.28 56.02 0.26 3.03 3.19 -0.16 13500.00 56.42 56.33 0.09 3.31 3.28 0.03 13525.00 55.95 55.93 0.02 2.91 3.21 -0.30 13550.00 54.62 54.85 -0.23 2.84 3.01 -0.17 13575.00 53.92 53.88 0.04 3.36 3.49 -0.13 13600.00 53.81 53.73 0.08 3.43 3.48 -0.06 13625.00 52.92 53.32 -0.40 4.40 3.34 1.06 13650.00 51.67 51.93 -0.26 3.19 3.33 -0.14 13675.00 51.29 51.16 0.13 3.13 3.39 -0.26 13700.00 51.10 51.18 -0.08 2.84 3.01 -0.18 13725.00 50.12 50.47 -0.35 2.55 2.95 -0.39 13750.00 48.77 49.08 -0.31 2.17 2.61 -0.44 13775.00 48.65 48.63 0.03 2.35 2.42 -0.08 13800.00 48.09 48.48 -0.39 2.12 2.08 0.04 13825.00 47.25 47.55 -0.30 1.77 1.96 -0.19 13850.00 46.33 46.30 0.02 1.94 2.16 -0.22 13875.00 45.84 45.87 -0.03 1.59 2.11 -0.51 13900.00 46.07 45.89 0.19 1.54 1.72 -0.18 13925.00 45.02 45.03 -0.01 1.79 1.77 0.03 13950.00 44.52 44.67 -0.15 1.36 1.97 -0.60 13975.00 44.58 44.44 0.14 1.52 1.47 0.06 14000.00 44.20 44.36 -0.16 1.27 1.81 -0.54 14025.00 43.25 43.29 -0.04 1.20 1.52 -0.32 14050.00 42.72 42.62 0.10 1.15 1.55 -0.40 14075.00 42.34 42.36 -0.02 0.51 0.93 -0.42 14100.00 42.17 42.09 0.07 1.14 1.12 0.02 14125.00 42.02 41.88 0.14 1.00 1.47 -0.47 14150.00 41.87 41.76 0.11 0.38 0.69 -0.31 14175.00 41.71 41.42 0.29 0.60 0.78 -0.18 14200.00 41.41 41.26 0.16 0.50 0.99 -0.48 14225.00 41.43 41.10 0.33 0.30 0.69 -0.39 14250.00 40.98 41.10 -0.12 0.31 0.70 -0.40 14275.00 40.79 40.66 0.13 0.69 0.92 -0.23 14300.00 39.50 39.77 -0.27 1.23 0.80 0.44 14325.00 38.76 38.64 0.13 1.35 0.74 0.61 14350.00 38.53 38.22 0.30 1.39 0.82 0.57 14375.00 38.41 38.10 0.31 1.25 0.89 0.36 14400.00 38.31 37.93 0.39 1.04 0.67 0.38 14425.00 38.28 37.84 0.44 1.13 0.69 0.44 14450.00 38.03 37.78 0.25 1.11 0.52 0.59 14475.00 37.79 37.59 0.20 1.11 0.44 0.67 14500.00 37.73 37.48 0.25 0.83 0.23 0.60 SURV -Q167 (OPS SUR -MA -003) 19 Nov 03 / Rev 15 Page 15 of 16 AK0413GCM129 Survey QC - RGS -CT Specification Sheet • I , , 1 0 r p 14525.00 37.67 37.49 0.17 0.75 0.02 0.73 14550.00 37.30 37.32 -0.02 0.84 0.07 0.78 14575.00 36.51 36.55 -0.04 1.45 0.59 0.86 14600.00 35.99 36.00 -0.01 1.95 1.08 0.87 14625.00 35.92 35.89 0.04 1.90 1.15 0.75 14650.00 35.33 35.58 -0.25 2.07 1.17 0.91 14675.00 34.28 34.74 -0.46 1.71 1.05 0.65 14700.00 32.46 32.74 -0.27 1.16 0.48 0.68 14725.00 29.65 30.61 -0.96 359.76 359.94 -0.18 14750.00 27.30 28.30 -1.00 358.96 359.06 -0.10 14775.00 25.25 26.28 -1.03 358.44 357.97 0.47 Average 0.2309 0.0423 Standard Deviation 0.2015 - 0.2110 Tolerance for both the Average and the Standard Casing 0.3o Casing 0.5 Deviation Drillpipe 0.3 Drillpipe 0.75° * Inclination and Azimuth interpolated to same depths as shown. SURV -Q167 (OPS SUR -14A -003) 19 Nov 03 / Rev 15 Page 16 of 16 AK0413GCM129 Survey QC - RGS -CT Analysis Sheet ID • •: 0 t.,-; SURVEY QUALITY CONTROL - DATA ANALYSIS REFERENCE SYSTEMS Grid System I I Grid Correction 1 0.00 Azimuth reference: Grid / True North TRUE NORTH Vertical reference: RKB /MSL/Other RKB I If other give details I TIE ON DATA Depth 0.00 Inclination 0.00 Azimuth 0.00 I TVD 1 0.00 Northings 0.00 Eastings 0.00 Latitude 70.5083 Az. Ref: Grid /True True Grid Corrected Y /N? N Description I CALIBRATION I Tool Number 1 1523 I Calibration Date 102 May 2012 I OPERATING TEMPERATURE Calibration range From 49.66 To 119.83 Gyro operating range From 75.32 To 99.12 I Spec' - Within calibration range FIELD ROLL TEST (Only valid on fixed structures. When notpossible input roll test data performed after return to base) Cal value Pre job offset Post job offset Abs dif.cal.post Abs dif.pre.post Spec' Accel Scale 0.000056 0.000162 0.000291 0.000291 0.000129 Cal /Post - 0.00015 Mass Unbalance 6.28 -0.39 -0.26 0.26 0.13 Pre /Post - 0.4 ° /hr INITIALISATION Depth (Approx) 1960.09 No of stns 7 Spec' - Min No. - 6 Azimuth Mean 342.29 Std deviation 0.10 Spec' - Azi SD 0.2° Inclination Mean 9.88 Std deviation 0.00 Spec' - Inc SD 0.1° Earth Horizontal Rate Mean (Abs(meas- theor)) 1 0.02 Std deviation 0.01 Spec' - See Q167 DRIFT TUNE Residual x gyro bias Mean -0.002 Std dev' 0.010 Spec's - Mean and SD - 0.333 ° /hr Residual y gyro bias Mean . 0.001 Std dev' 0.003 Spec's - Mean and SD - 0.333 ° /hr TOOLFACE RATE I Maximum toolface rate 1 78.64 I Spec' - 400° /sec I IN /OUT COMPARISON (AZI' N/A IF INC' <15 ° Inclination Difference Mean 0.23 Std dev' 0.20 Spec's - Casing 0.3° /Drill pipe 0.3° Azimuth Difference Mean 0.04 Std dev' 0.21 Spec's - Casing 0.5° /Drill pipe 0.75° Lateral Divergence /1000 1.46 Spec - 5.0/1000 Vertical Divergence /1000 1.85 Spec' - 2.0/1000 DEPTH CONTROL Wireline Company Schlumberger I Line type 7/32" Encoder SF I Schlumberger Max Depth (TD) 14794 CCL Corrected No Zero Depth (Rig up) RKB @ 46 ft Rezero Depth -6.4 Given pup joint depth NA Measured P3 NA Strech cor. At TD divided by TD /1000 .987 Spec' - 1.5/1000 Dif. Between riqup and rezero depths divided by TD /1000 .432 Spec' - 2.0/1000 Dif. Between given and meas depth divided by meas /1000 NA Spec' - 2.0/1000 SURV -Q165 (OPS SUR -MA -010) 22n San 2004 / Revision 20 Page 1 of 1 AK0413GCM129 A Survey QC - RGS -CT Acceptance Sheet FIELD AND SURVEY INFORMATION Operator BP EXPLORATION ALASKA INC Field / Platform WELLHEAD Well Number MILNE POINT MPF -70 Survey section From 0.00 ft. to 14823.76 ft. Date 4/12/2013 Gyrodata Job No AK0413GCM129 Gyrodata Surveyors Edwin Hardon, Chris Ray Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes /No /NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey 'Hot' section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land /fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurvey with backup tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurvey with back up tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investigate and comment if effects are negligible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurvey with backup tool Inrun /Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other QC parameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV -Q166 (OPS SUR -MA -003) 13 Nov 03 / Revision 12 Page 1 of 1 AK0413GCM129 4 • • bp BP Exploration (Alaska) Inc. . ._,,,- Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 SOWED FEB 2 I ZWZ Mr. Tom Maunder a 5-_ J 53 Alaska Oil and Gas Conservation Commission 333 West 7 Avenue Anchorage, Alaska 99501 rAPF 76 Subject: Corrosion Inhibitor Treatments of MPF -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) MPF -Pad 10/29/2011 Corrosion Initial top of Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement Vol. of cement pumped cement date inhibitor sealant date ft bbls ft gal MPF -01 1950450 50029225520000 10.2 N/A 10.2 N/A 122.4 8/7/2011 MPF -02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011 MPF -05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/92011 MPF-06 1960020 50029226390000 1.2 N/A 1.2 N/A 15.3 8/2/2011 MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 8/9/2011 MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 8/2/2011 MPF -13 1950270 50029225490000 0.2 N/A 02 N/A 8.5 10/6/2011 MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/6/2011 MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011 MPF -18 1961000 50029226810000 8.3 N/A 8.3 N/A 91.8 8/2/2011 MPF -21 1961350 50029226940000 1.8 N/A 1.8 N/A 15.3 8/6/2011 MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.6 8/12011 MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011 MPF -26 1970840 50029227670000 1.8 N/A 1.8 N/A 11.9 8/1/2011 MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011 MPF -30 1951840 50029226230000 0.8 N/A 0.8 N/A 6.8 8/1/2011 MPF -33 2010620 50029226890000 23 Need top job MPF-34 1971970 50029228240000 4.1 N/A 4.1 N/A 13.6 8/1/2011 MPF-37 1950250 50029225480000 0.2 N/A 02 N/A 8.5 10/6/2011 MPF -38 1951680 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011 MPF-41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011 MPF -42 1970200 50029227410000 1.8 N/A 1.8 N/A 13.6 8/1/2011 MPF-45 1950580 50029225560000 8 N/A 8 N/A 78.2 8/11/2011 MPF-46 1940270 50029224500000 Sealed Conductor N/A WA N/A N/A N/A MPF -49 1970030 50029227320000 2.3 N/A 2.3 N/A 18.7 8/11/2011 MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011 MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/192011 MPF -54 1961920 50029227260000 1.7 N/A 1.7 N/A 10.2 8/1/2011 MPF -57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/11/2011 MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF-61 1951170 50029225820000 62 Need top job MPF -62 1951610 50029226090000 2.0 NN 2.0 N/A 13.6 9/12011 MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -06A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011 MPF-69 1951250 50029225860000 0.8 N/A 0.8 N/A 8.5 8/4/2011 -- "' - lib MPF -70 1951530 50029226030000 1.7 N/A 1.7 N/A 15.3 7/31/2011 MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011 MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011 MPF -77 1951360 50029225940000 0.2 N/A 02 N/A 6.8 10/5/2011 MPF -78 _ 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/31/2011 MPF -79 1971800 50029228130000 0.6 N/A 0.6 N/A 6.8 8/3/2011 MPF-80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 8/3/2011 MPF -81 2000680 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011 MPF -82 2091350 50029229710000 1.7 N/A 1.7 N/A 15.3 8/3/2011 MPF -83 2000930 50029229630000 12 N/A 12 N/A 13.6 8/3/2011 MPF-84B 2001760 50029229310200 1.2 N/A 12 N/A 10.2 8/3/2011 MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/1/2011 MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 , 8/12/2011 MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/13/2011 MPF -88 2031930 50029231850000 1.3 N/A 1.3 N/A 15.3 8/3/2011 MPF -89 2050900 50029232680000 1.2 N/A 12 N/A 10.2 8/3/2011 MPF -90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011 MPF -91 2051100 50029232710000 1.7 N/A 1.7 N/A 11.9 8/13/2011 MPF -92 1981930 50029229240000 0.8 N/A 0.8 N/A 5.1 8/13/2011 MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011 MPF -94 2011700 50029230400000 1.8 N/A 1.8 N/A 13.6 8/13/2011 MPF -95 1981790 50029229180000 0.5 N/A 0.5 N/A 3.4 8/13/2011 MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/1/2011 MPF -99 2061560 50029233320000 1.3 N/A 1.3 N/A 11.9 8/112011 MEMORANDUM To~ Jim Regg / P.I. Supervisor ~~~ 311 l`~ IROM: Jeff Jones Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, March 02, 2010 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC F-70 MILNE PT UNIT KR F-70 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv Comm Well Name: MILNE PT UNIT KR F-70 API Well Number: 50-029-22603-00-00 Inspector Name: Jeff Jones Insp Num: mitJJ100227213130 Permit Number: 195-153-0 Inspection Date: 2/8/2010 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well ~ F-~ype Inj. w~TVD P.T.D~ 1951530 ~TypeTest SPT TCSt psl 69ss ~ Io 1747 ~ QA 370 ~ Zolo f o 590 560 I99s 540 ---1----- ~ - - InteCVal 4YRTST P~ P '~ TUbing 1310 1310 1310 ~ 1310 Notes• 3.1 BBLS diesel pumped. 1 well inspected; no exceptions noted. /, z t ~ ; r: ~ ~ 7 a ~~ Tuesday, Mazch 02, 2010 Page 1 of 1 Jan -10-01 02:1Bpm From -MARATHON OIL +9155646489 T-236 P.03/11 F-540 kW i111 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request; Abandon _ Suspend _ Operation Shutdown _ Re-enter Suspended Well Alter Casing _ Repair Well — Plugging _ Time Extension _ Sumulate— Change Approved Program _ Pull Tubing _ Variance_ Perforate X Other- ther_2. 21ffame of Operator 5. Type of Well: 6. Datum Elevatior' (DF or KB) MARATHON OIL COMPANY Development X 95' KS feet Unit or Property Name s, Address Exploratory7. P. 0, Box 196168, Anchorage, AK 99519-6168 Stratigraphic— _ Kenai Beluga Unit e. a umber a. Location of Well at Surface Service 406' FSL, 1306' FWL, Sec, 6, T4N, 1311 W, S. M. KBU 31-7rd s. Permit Num er j /� L-_ "t At top of Productive Interval 1056' FNL, 2524' FWL, Sec 7, T4N, Ft11 W, S.M. @ 6672' TVD -46-4ro I J �1 At Effective Depth 1o, API Number Perforate New interval 50-133-20347 At Total Depth 11, ie o0 1073' FNL, 2607' FWL, Seo, 7, T4N, R1 1W, S,M, (9 7163' TVD Kenai Gab Field 12. Present Well Condition Summary Total Depth' measured 7550 feet Plugs (measured) 7400' (baffle collar) true vertical 7094 feet Effective Depth: measured 7.305 feet Junk (measured) 7305M D (retainer junk) true vertical 6858 feet Casing Length Size Cemented Measured Depth True Vertical Depth Structural Conductor 95' 20" Driven 95' 95' Surface 2526' 13-318" 1400sx 2526' 2459' Intermediate 5671' 9-5/8" 2010sx 5671' ???? Production 7575' 7" 740ax 7576' 7183' Liner Perforation Depth; measured 7080'-7114', 7125'-7146, 7180'-7193', 7207'-7212', 7225'-7231', 7250'-7326', 7452'-7480', 7490'-7508', 7512'•75161, 7529'-7534' true vertical 8674'-6208', 6718'-6739'. 6772'-6785', 6799'-6804', 6817'-6823', 6843'-6867', 7159'-7187', 7197'-7215'1 7219'-7223', 7236'-7241' Tubing (size, grade, and measured depth) 3-1/2', 92#, N-80. 6444' Packers and SSSV (type and measured depth) Baker SAB packer 4 6305' 1s, Attachments Description Summary of Proposal Detailed Operations Program X BOPS etch 14. Estimated Date or Commencing Operation 1s. Status of Well Classi icat on as,. 1/15/01 Oil _ Gas X Suspended 16. If P roposal was Verbally Approv Name of Approver Date Approved Service 17. 1 hereby certi that the foregoing Is true and correct to the best of my knowledge. � Signed Denise Titus Title Production En ineer Date 1/10/01 FOR COMMISSIO S O LY Conditions of Approval; Notify Commission so reprosvntative may witness Approves o. U Plug IntegrityBOP Test Location Clearance _� lJ Mechanical Integrity TestSubsequent Form Required 10- x,•IN/AL SIGNED BY / Approved by Order of the Commission '1JI.L:3fl101tllt Commissioner Date d` Form 10-403 Rev, 06l10,1610 ORIGINAL Ilk JAN 1 0 2001 Suh/nit in Triplicate Alaska Oil & Gas Cons. Commission Anchorage Jan -10-01 02:18pm From—MARATHON OIL +9155646489 T-236 P.04/11 F-540 A Marathon Oil Company Alaska Region KBU 31-7rd Kenai Gas Field, Pad 14.6 Perforate Obiective: Add Perforations to lower quality reservoir between unfraced and fraced intervals. Procedure: 1. MIRU Schlumberger electric line. 2. Test BOPs and lubricator to 2500 psig. 3. RIH w/ 2-1/8" PEJ Strip gun, 6 spf, 0 deg. phase. (Tie in with Array Induction) 4. Perforate as follows: MD 7388'-7420' 5. RDMO electric line_ 6. Flow well as per engineer's instruction. 01108/01, DNIT RECEIVE® JAN 1 0 2001 Alaska Oil &G � _ missipa Andiorage Jan -10-01 02:19Pm From -MARATHON OIL +9155646489 T-236 P.05/I1 F-540 KBU 31-7rd Cooper Tubing Hanger (29.5-30.6, 00:10.906, tD:2.953) Tubing (30.5-6444.0, OD:3.500, ID:2.984) Intermediate Casing (0.0.5680.0, OD:9.625) Structural Casing (0.0-95.0, OD 20.000) Cameo Injection Mandrel (1012.7-1019.6, OD 5.188, ID:2.906) Surface Casing (0.0-2526.0, 013:13.375) Production Casing (0.0.7575.0, 00:7.000) Con: (6078,0-6138.0) Baker 80-40 K -Anchor (6304.7-6305.8, OD:4.750, 10*3?5D) Baicef 8440x32 SAB Packer(6305.8-6310.7, OD: .687, 10:3.250) Cameo X Nipple (6350.3-6351.3, OD3,859, 10:2.813) Cameo X Nipple (6412.2-6413.2, 013:3.859, 10:2.813) Wireline Reentry Guide (6444.0.6444.6, 00:3.859, I 1D:3A00) API 50-133-20347 L10 Perf (7080.0-7114.0) Fracture Treatment (7080.0.7146.0) -- -.�- - Perf (7125.0-7137.0) ----- �- Perf (7141.0-7146.0) - Core (7130.0-7190.0) Perf (7180.0-7193.0) ---- ---- ... Perf (7207.0-7212.0) Perf (7225.0-7231.0) Fracture Treatment (7180.0.7326.0) Perf (7250.0-7290.0) Perf (7290.0-7326.0) Perf (7452.0-7480.0) . Perf (7490.0.7508,0) Perf (7512.07516.0) Perf (7$29.0-7534.0) Fill (7551.0-755P_t.0, 0DA188) Cement Plug (7556.11-7575,0, OD:6.016) API 50-133-20347 L10 4111/97 RECEIVE® JAN 1 0 2001 Alaska Oil & Gas Cons. CORMn Ssion Anchorarle L11 -- -.�- - L12 ----- �- - L13 ---- ---- ... L.17 . L18 4111/97 RECEIVE® JAN 1 0 2001 Alaska Oil & Gas Cons. CORMn Ssion Anchorarle MEMORANDUM e State of Alaska e Alaska Oil and Gas Conservation Commission TO: Jim Regg P.l. Supervisor '~'t1 2117/06 DATE: Thursday, February 16,2006 FROM: Jeff Jones Petroleum Inspector SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC F-70 '5 *?;> """ME PT UNIT KH"" \ cfJ" \ Src: Inspector Reviewed By: ~-:;>, P.I. Suprv ~ t-:r<-- Comm Well Name: MILNE PT UNIT KR F-70 API Well Number 50-029-22603 -00-00 Inspector Name: Jeff Jones Insp Num: mitlJ06021015 1 144 Permit Number: 195-153-0 Inspection Date: 2/10/2006 Rei Insp Num Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. -- I ~, i I I Well I F-70 ! Type Inj. ! W I TVD 6988 IA I 460 2100 2060 2060 I I! ¡ I -~- 1951530 I I P.T. I TypeTest I SPT i Test psi 1747 I OA 300 500 460 450 I 4YRTST P Tubing I 3550 3550 3550 I 3550 I Interval P/F I , Notes 2.2 BBLS diesel pumped. 1 well house inspected; no exceptions noted. NON-CONFIDENTIAL c , ,./ ;ej;~;!i\·.;ri \ t)\,..!N";;;\i\~ Thursday, February 16,2006 Page 1 of 1 -r ": '" ~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS r-'\ '" 1. Operations Performed: AbandonD Alter CasingO Change Approved Program D 2. Operator SuspendD Repair Well 0 Pull TubingD Operation ShutdownD Plug perforationsD Perforate New Pool 0 4. Current Well Class: Perforate 0 WaiverO Stimulate 0 Time ExtensionD Re-enter Suspended Well 0 OtherŒJ Convert to WAG Name: BP Exploration (Alaska), Inc. 5. Permit to Drill Number: 195-1530 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): Development 0 46.00 8. Property Designation: ADL-355018 11. Present Well Condition Summary: StratigraphicD 9. Well Name and Number: MPF-70 10. Field/Pool(s): Kuparuk River Field / Kuparuk River Oil Pool, Milne Point Unit ExploratoryD Service ŒI 6. API Number 50-029-22603-00-00 Total Depth measured 14989 feet true vertical 7636.5 feet Effective Depth measured 14880 feet true vertical 7533.9 feet Plugs (measured) Junk (measured) None None Casing Conductor Production Surface Length 76 14934 7049 Size 20" 91.5# H-40 7" 26# L-80 9-5/8" 40# L-80 MD 37 35 36 113 - 14969 - 7085 TVD 37.0 - 113.0 35.0 - 7617.7 36.0 - 4487.4 Burst Collapse 470 5410 3090 1490 7240 5750 Perforation depth: Tubing ( size, grade, and measured depth): 4-1/2" 12.6# L-80 @ 33 R~C~/II~D MAY 2 (j ~142~0I&~ (004 ,. , An~' ~Î88ion Measured depth: 14596 -14696 True vertical depth: 7286.24 - 7368.49 Packers & SSSV (type & measured depth): 4-1/2" Baker S-3 Perm Packer @ 14232 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: Oil-Bbl 0 Representative Dailv Averaae Production or Iniection Data Gas-Me! Water-Bbl Casing Pressure 0 -4040 924 13 0 -2383 0 924 Tubing Pressure 3271 3477 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentD ServiceŒ Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown 0 OilD GasD WAG ŒI GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. ISUndry Number or N/A if C.O. Exempt: N/A Daily Report of Well Operations - 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garry Catron ;1y~ Title Production Technical Assistant Signature Phone 564-4657 Date 8/21/98 Form 10-404 Revised 12/2003 ORIGiNAl fØ)\AS BfL 1M G¡S -.~ r ... . ~ r'\ MPF-70 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 01/27/98 Perform MIT on IA. 08/09/98 Freeze protect well with 20 bbls MeOH for WAG piping conversion. 08/21/98 WAG swap to gas BBLS 20 20 Methonal TOTAL FLUIDS PUMPED Page 1 ~ ;'-'" ..., ~ ,,-.,. Tree: 41/8" - 5M CIW Wellhead: 11" 5M FMC Gen, 5 w/ 11" x 4.5" FMC Tbg. Hng. , 4.5" NSCT threads top and bottom, 4" CIW "H" BPV profile 20" 91.1 ppf, H-40csg. I 113' I. KOP @ 400' Max. hole angle = 72 to 75 deg. f/ 4400' to 12,000' Hole angle through perfs = 36 deg. 95/8",40 ppf, L-80 Btrc. 7085' md ,.. 7" 26 ppf, L-80, NSCC production easing (drift ID = 6.151", cap. = 0.0383 bpf) 4.5", 12.6 ppf, L-BO Btrc. tubing (eap. = 0.0152 bpI, drift = 3.958") Minimum tubing restriction = 3.725" "XN" profile @ 14,238' md. Stimulation Summary none performed Perforation Summary Ref loa: 02/29/96 SBT / GR / CCL SiZE SPF Interval (TVD) 4.5" 5 14,596-14,696' (7269'-7351') 32.0 gm. AlphaJet charges (EHD = 0.50" TIP = 32.0") @ 135/45 deg. phasing MPU F- 1Oi j ., 2 I I r L~ ~ ................-~I DATE REV. BY COMMENTS 10/26/95 JBF Drilled and Cased by Nabors 27E 03/03/96 JBF WIW completion by Nabors 4ES 03/24/97 JBF WIW Re-completion by Nabors 4ES ~ Orig. RF elev. = 46.0' (N 27E) Orig. GL. elev.= 12.0' RT to tbg. spool = 32.69' (N 27E) 7" Baker 'S-3" Packer 114,215' md I 4.5" HES 'XN' npl. 114,238'mdl (w/3.725" no-go) 4.5" WLEG 114,248' md I Two 7" marker its. f/14,367' to 14,406' wlm 7" float collar (PBTD) 7" easing shoe 114,880' mdl 114,969' md I MILNE POINT UNIT WELL F-7Oi API NO: 50-029-22603 BP EXPLORATION (AK) hsred' - Ices ri-! Ijin TO: Blair Wondzell FROM: Chris West DATE: October 27, 1995 SUBJECT: MPB-24 Well Suspension APl # 50-029-22642 Blair; Please find attached a copy of the Form 10-403 to temporarily susPend this well as per AOGCC 20- - AAC 25.110. As discussed this morning we propose setting three plugs in this well as detailed in the attached form. This will allow us to retain the wellbore for potential future sidetrack or service well use. We would like to keep the well's 9-5/8" x 7" annulus available for the injection of liquid 'wastes. There are no other well annulii on this pad for injection. The annulus for MPB-24 was approved for injection as part of the permit dated 25 January 1996. The annulus will be freeze protected before moving the rig. Thank you for your help in this matter. Please call me if I maY be of any assistance. Chris West Drilling Operations Engineer Nabors 27E (907)-564-5089 ANNULAR INJECTION DATA ENTRY SCREEN Asset NlilD.e. .......................................... Rig Name ~.~I~.Qr.~..~,F,, ............................. Inj Well Name U..P...F.:.7...0. .............. ....................... Sur Csg Dep 7...~..1..~. · .............................. Cumulative Data, ~j~I Rig Completion Formation Intermittent Well Total Mud/Ctg Wash' Fluids Fluids Freeze ........ · ~.~.,7..z~ ............... 1.1.~,.z~.4..: ........ . .......... .z~....,,~ .................... .i ..... ~: ............ :.,~.~,,:.iii~ ...... ~:,. i ......... :.t.%. ....... Legal Desc :8.1.~.9.'.~[,~.:8~.~.1.'.~.F,,~,..~;.fI~..§,.T..1.:~,..E[.1.0.F,, ................................. ,. SCANNED~ NOV Research Permit Start ........ §.s.lZ.-.~.§ ........ Permit End ....... .4~.-.i.Z.s~Z.' ....... Final Freeze Daily Data Mud, ~tgs, cn"~i ~ i~ '~-~: · M P F-~-~_~___-~_ ~)8/26/96 1 O0 " . _ 30 _ 130 3 ~ 500 Open 199 MPF-66 08/27/96 1,300 1,300 3 1300 ~Open MPF-66 ....... 08/28/96 : 140 . - ......... ~0 ~' ~ 300 Open MPF-66 08/29/96 370 . 370 3 1300 Open M PF-66 08/30/96 ,200 200 3 1300 Open M PF-66 08/31/96 490 490 3 1300 Open MPF-66 09/01/96 350 350 3 1300 Open ,~'i'~ ....... O~J~J~b ............ ~5~ i~'~ ...................... ~---- 1300 .... Open M'~'~:~ ............. ~]~]~ ~ ~ .................... ~ 1300 MPF-66 485 485 3 1300 Open ~ PF-66 ~ 09/06/96 155 -- 155 2,5 1300 Open MPF-66 09/07/96 ~35 ~ 135 2,5 1300 Open .... MPF-66 :09/08/96 80 80 2.5 1250 Open ~PF-66 09/09/96 245 245 ~ 1450 Open MPF-66 ~j09/10/96 35 ~ 35 ~ 1350 Open MPF-66 ....... .J~'~7~ .............. ~- .................. ; ........................... ~' 3 1350 Open ~:~'i .................. '] 6i~i"~'i'~ .................... 'i'~ ....................................................................................................................................................................................................... i"~6 ............................ 2.5 ~ 350 '~'~'~ ............................. ~'~:i'~ ................. 5iii'~i~ ............. i'i'i ii~ ~ i ........... ii50 ................................. .................. J .......................................... : .................................................... : ................................................................................................................................................................................................................ -._, Open MPF-66 09/14/96 240 240 2.5 1400 '~ ................................... ~'~'~:'i'~ ......................... ~ii'i"ii~ .................... '~'i"i' ......................................................................................... .................................................................................................................................................................................................... ~'i"i ................................. ~.5 ~ 400 '~'~ ............................................ '~'~'~:'~'~ ....................... ~'~'~'~'~"~'~ ...................... ~ ........................................................................................... ~ ................................................................................................................................................................................................... '~'~'~' ................................. ~ 1450 '~'~e'~ ........................................... .......................................................... I ................. ~ ............. ' ..................................................................................................................................................................................................... MPF-66 09/17/96 220 220 3 1400 Open Summary MPF-66 09/19/96 220 220 2.5 1250 Open ~SJ:Z~6- ............. ~)~b-~)-~- ........... '~'~ ......................................................................................................... §~'~ .................. 2.5 1450 ~'~h-"-: ............................................... ; .................................................. '~'~'~:~ ...................... 6~'~"~'~ ..................... '~'~'~' ........................................... ~ .......................................................................................................................................................................................................................................... ~ ................................... 2.5 ~ 45o ~'~'~'"'"'": .................................................................................................................................................................................................................................................................................................................................................................................... 09/22/g6 300 80 ~'~ ................................... 2.5 1450 '~'~'~'~ .............................................................................................................................................................................. '~'~'~;~'~ ......................... ~]~]~ ..................... '~'~'~ ........................................... ~'~; ............................................................................. ~ .................................................................................................................................................................................................................... 890 2.5 1450 Open MPF-66 '~9/24/96 ~6~" ' 760 2.5 1450 Open ~:~......~ .......... ~9j~(~ .................. ~ .................... '~'~.~ 8~ ................. ~ ..... ~: ..................................... ~ ............ : .................. ~ ........................ ~2.~_ 1450 Open MPF-66 09/26/96 770 50 820 3 ~0 ~'~'~ ............................................................................................................................... ~P~:~- ......... 09/27/969 ~'~' ...................... : ....... 280 3 1500 '~'~ .......................... ........................................................ : ............................ , ........... MPF-66 09/28/96 200 200 3 1500 Open MPF-66 09/29/96 160 160 3 1500 Open MPF-66 09/30/96 . 55~ ...... ~0 --' 60 870 ~- 1500 open ~'~'~;~'~ ..................... ~"~6'~ .................... ~ ..................................................................................................................................................................................... '~6 ................................................................................ ~'~" ............................... 3 1500 , ~:'~'~ ........................ ~'~6~/~ ...................................................................................................................................................................................................................... ~h- ....................................................................................... ~ .............................................................................................................................................................................................................................. 1.5 1200 open ~P-:~k .................... ~'~6'~' ................. ~'~ .................................................................................................................................................................................................. ~k~ ............................................................ ~6~'~'~-~'~hr-y' ..................................................................... '~'~'~:'~'k ....................... ~"~k'~'~'~ ..................... ~"~6'""" ................. .................................................. '"'"'" ......... : .................................................................................................................................................................................. : ..................... ~"~ ....................................................................................................................................................................................................................................... MPF-62 10/30/95 2,038 2,038 ........................................................................................................................................................................................................ ~ ............................................................................................. · ................................................................................................................................................................................................................................................................................................................................................... ................................. iMPF-62 ;10/31/95 ,190 190 MPF-62 11/01/95 250 250 ................................................................................................................................................. MPF-62 11/02/95 600 600 ......................................... ; ............................... , ................ ; MPF-62 11/03/95 140 140 . .................................................................................. ~PF-62 11/04/95 235 235 MPF-62 11/05/95 11,535 1,535 MPF-62 11/06/95 1,300 1,300 ,. MP F-62 11/07/95 1 O0 1 O0 56 256 Open .......................................................................................................................................................................................................................................................................................................................................................................... ~ ........................................................................................................................................................................ ~ ............................................ .............................................................................................................................................................................................................................................................................. ; ................................. I ........................................... , ............................................................................................................................................................................................................... , ........................................................................................................................................................................................ ~ ............................................................................. ~ .......................... ..................................................................................................................................................................... ~ ........................................................................................................... ¢.....:_+._.~;~...,~. ~.~,~,.:?.[:.:.:.~ ~.:....::; I,-. J I - .......................................... ~ I I ...................................... .................. ., .......................................................................................................... ...................................................... ~ d rvlces rilling December 14, 1998 900 East Benson Boulevard, MB 8-1 · Anchorage, Alaska 99508 (907) 561-5111 Fax: (907) 564-5193 Wendy Mahan Natural Resource Manager Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501-3192 RECEIVED Re: Annular Disposal Information Request Dear Ms. Mahan: 141998 Alaska 0il & Gas Cons. Commission Anchorage On October 28, 1998 you requested an update from Shared Service Drilling regarding Annular Disposal Records from July 25, 1995 through preSent time. We compared your list with Our records and are able to provide you with the following data: · Individual Annular Disposal Logs from the SSD database Which coincide with the approved wells on your attached AOGCC Annular Log. The. SSD records are provided to you in the same order as listed on your log. · There were some wells on your list which were not injected into. These wells are identified as follows: · Endicott wells 1-03/P-16, 1-65/N-25, 1-59/0-24 · Exploration well Pete's Wicked #1 · Milne Point wells E-22, E-23, F-O1, L-16, J-19, L-25, F-30, L-21, K-38, NMP #1 & K-05, K-02, H-07, K-25, K-37, E-17, F-21, K-30, K-34, K-21i, F-66, K-06, K-54, K-33, F-49i, K-18 · PBU Wells E-38, 18-34, 15-42, S-29A, 15-46, B-36, 15-43, 11-38 · The reason many of these annuli were not used is because the waste materials generated from these wells were injected into other approved annuli. Hopefully the injection logs submitted with this letter will clarify this. In addition, please note that our records show: · The wells listed above in italics were permitted but not used for annular disposal. · The wells listed above in BOLD were not permitted for annular disposal. Wells drilled after June 6, 1996 were required by SSD procedure to be permitted with a SUndry Approval (10-403) form. Our records show that no Sundry Approval for Annular Disposal was filed for these wells. Wells drilled between July 25, 1995 and june 6, 1996 were automatically approved for annular disposal with the Permit to Drill. · We also provide you with a cumulative report from our database of records from July 25, 1995 through the present. FrOm those records, we show the following wells not listed on your report were used for annular disposal: ,, ,Annular Disposal Letter 12/14/98 ~.4. ~?..~ q,t- ~ 4z- ~1~-15'7.. ! ! · Endicott wells i-23/O-15, 1-61/Q-20, 2-40/S-22 · Exploration well Sourdoueh #3 - ~'_' o o g_~ , ~.~ · __ __ _ _____M]lnePointwellsF-06, H-o5, H-06, J-13, L-24 - · PBU wells-18-30, 18-31, 14-a,4,.S_~-43, E-34, E-36, G-04A, and S-33- :}-o5 2. 'D3-~_o ' q c. · Individual logs are provided to ~ou fo~ ttiese ~'ogs is we~l. · Finally, our records show that the B-24 outer annulus was left open (see attached correspondence) Thank you for the opportunity to provide clarity to these records· If I can be of any further assistance please do not hesitate to contact me at 564-5183, or Karen Thomas, Environmental Advisor at 564-4305. Sincerely, Fritz P. Gunkel Shared Service Drilling Manager FPG/KMT cc: Dave Wallace - HSE Manager (w/out attachments) ~SCANNED NOV ~_ $ ~002 RECEIVED 1998 Alaska Oii& Gas Cons, Comm%ssio,~ Anchora,3o idicott )yon 15 1-19/I-18 5000 )yon 15 1-23/O-15 4246 har(ll-d Se~ice DHIling ,nn~ar Injection Volumes uly 25, 1995 until December 1998 umulative Report Surface Casing Inj Well Depth Cum Mud Cum Rig Cum Compl Cum Form Cum Interm Cum Final Disposal Period Annulus Legal Desc Cum Total & Ctgs Wash Fluids Fluids Freeze Freeze Start End Slatus Sec. 36, T12N, R16E 8,960 7,848 992 120 12/5/95 12/5/96 Open 2020'FNL, 2087'FEW, SEC.36,T12N,R16E 32,084 30,604 1,160 200 120 9/30/95 12/31/95 Open 150 8/31/95 12/31/95 Broached ~yon 15 1-61/Q-20 4236 3075'NSL, 2207'WEL, Sec 13,T12N, R16E 25,228 21,379 2,613 1,176 60 12/5/95 12/5/96 Open , . ~Y°? !.5 .... 2:.4..0/S:22 .....4~3! 2020'FNL, 2289'FEL, Sec 36,T12N, R16E 31,195 29,952 1,063 120 60 7/25/95 12/31/95 Open )A ,yon 14 15-47 3515 ............ .3.~.4.~iN_S.L..,.....4~..5..6,.~E.I~,...~.e.c. ~2~.!.!.N..,....F?..4!~. ............... ~?.07 .......................... 9..0...3. ..................... 2.,.._0..0.~ ......................................................................................................................................................................................................................................................... 90 11/7/95 12/31/95 open ~yon 14 DS 15-45 3829 4749' NSL, 5180' WEL, Sec. 22, T11N, 1,882 1,697 134 51 4/4/96 4/4/97 Broached ,yon 14 DS 15-48 . 3548 Sec. 22, T11N, R14E 3,385 216 820 2,283 66 12/21/95 12/21/96 Open ,yon 14 DS 15-49 3667 4676' NSL, 5165' WEL, Sec. 22, T11N, 4,669 1,559 1,141 1,904 65 2/21/96 2/21/97 Open ,,y...o.,,n...,?,., ................................. ].~:,,.3_,2, ........................................ .,,3?, ............................... ,,3,,,?,;U_S_L.,;_.~.!',~,.,E,,,.L,.~..,.,,S_,e,?,~,~.T,.!,,!.N..~_R_!~E .............................. ~.~...3,,.!.,! ............................... !_~.,8,,~Z ............................. _2_0_o ..................... ?._o. ............................................................... !_5o. ........ ,_s/_2,,~!~.~ ........... ]?_<_9_,,5. ................ ,_o,.p_~_ ,.Y_0,,,,,",,,~ ................................... !,,.8,:~,;~ ................................. .~,!,,?. ............................ .,3,?',,.N,?,,~,,:~.?,.~,,.,L,,,,,,~e,~.:~,,,,T.,,,!,,!.,N.,~_R.,!,~,,E. ....................................... ,,5,,~.!,.~ ........................ ,,,2.,'_.0,.~,,,0, ............................ ,,3,.~?,?,_5. ............................................................................................................................................ !.0., ............................ !.,,2,,,..o. ................ ~,2..~,~, ........................ !,~,.,3,.,!.,/,,~ ........................ 9.?.?, ................ bors 18E 12-35 3543 348'NSL, 705'WEL, Sec 18,T10N, R14E 3,723 3,436 137 150 9/1/95 12/31/95 Open bors 18E 12-36 3452 63'FSL, 899'FEL, Sec 18,T10N, R15E 4,002 1,961 50 1,871 120 10/13/95 12/31/95 Open bors 18E 13-36 3431 1585'NSL, 5187'WEL, Sec 13,T10N, R14E 4,137 3,523 ' 464 150 10/26/95 12/31/95 Open .b.~.r.~..!..8...E' ...................... !.:t~.~ ................................... .3.2..8..~ .................................. 2..~.2..~.'..N.S...L...:.!~...!..7.'._W_.E..L.,,S..e~...9_,..T I_O_N.,.._.R..!..~ E. ........................... .37~.~ ................................ ..2.,...3.!..9- ............................... !.,..57.S.. ................................... 1208/17/9512/31/95Open ploration 314 Sourdough #3 4236 2245'FSL, 5067' FEL, Sec. 29, T9N, R24E 5,786 4,630 1,156 1/26/96 1/26/97 Closed , ne MPK-17 3508 3648'NSL,2100'WEL, Sec.03,T12NR11E 19,608 18,538 285 685 100 4/18/96 4/18/97 . Open ~ors 22E MPC-23 4941 1038 NSL, 2404 WEL, Sec 10,T13N, 2,060 1,800 130 130 1/25/96 1/25/97 Open ?..o..r.s._22_.E. .................... . .M....P....c..-..2_5 ............... :..........8_.5...9...5.. ......................... _ 1...1..4_3:_F .N..L.,...2_ 43_6'_F_W_ .L. ,. _S_ .e.c_ ] 0 ,__T_I_ _3_N_,_ _R.I_O_ .E- ................... !..!9_0..5.. .......................... !.,._4_6.5.. ............... :..-_3_0_0__ .................. : ............................................ .1...4.0 ........ 1/_.5../_96__ ............. 1/_5_/9_~7 .............. _?_p.e__~n ........ ~)ors 22E MPC-26 4704 1086 NSL, 2419 WEL, Sec 10,T13N, 5,228 4,483 555 190 12/19/95 12/19/96 Open ?.?...~.~__: ............... .M..~:~.~ .............................. ~75. ............................... .S...e.?....:L°.,..T.!..3..~,......R...!.?.~ ....................................................................................................................... ~.2~ ........................................ ~?..0. ..................................................................................................................................................................................................................................................... ..7..5.. ............... ~.!..5..!~ ........................ ~!.~./..~ ............................. .o..p?. ................ Page 1 N3dO 96//./S ' Z6/Z/9 09 LLG't uedo Z6/I.g/~ g6/iLg~ 08L g01.'g 9~I~'g Lgg'P 'N L I.J.. 'SZ 'O:IS "I::IM ,/.g0 L "ISN ,gg6g gg~g 88-a 6 uoAo( uedo Z6/0 L/ff 96/0~/t, 091. 0S1. 38L~ 'N1.1.1 '9~ 'O~S 9L~8 1.8-O 6 uo/[o( uedo Z.611.8/I. 96/L8/I. 0'P'I. g80~1, g/..g' I. I. 1.8'g 1.9~'g 'NI. LJ. '8~ 'O:IS "13M ,9901. "ISN ,9~98 ,991~8 08-C] 6 uo,(o( uedo 98/8 LB L cj6/9 L/~ I. gl~ I. I. Zff'8 6g8' 1. 866' I. 896'9 381. I:! 'N I. 1. J.'Z oeS '"F:IM,BLGZ "ISN,Zffg~ I. 698 gs-.-i uedo Z6/1.Z/~ 96/LZ/Z 091. 9gt 0gg 881. 99ff' I. :18 Jl:l 'N1.1..L'Z oeS "F:IM,t,Z 1.Z "18N,Z888 0/SS 88-..-I :q9 ' VOA ................................................................................................................................................................................................................................... : .................... ,, ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ : ....................... uedo ' cj6/L~/~L cJ6/Z.~/L 1. OZ. ~88 991. 0~8'1. 006'~ 06Z.'9 301.1:1 'NSLI'9 oes "13~,091.9 "19N,1~98 9L~9 ~'~-'qdW ~.~: s,oqer uedo 96/I.8~ L G6/'& I./60t, 1. 99 9/.Z '01x ggt,'/_ gzf"9 30LH 'NSL.L'g oes "l:lM, gcjcjg "ISN,/-Sgg Gg0z 9/.-.-IdlN 3/-~ s]oqeF uedo 96/1.8/~ L 96/1.8/8 cJZ S9916 01~Z.'6 30tl=l 'NS 1..L'9 oes '-13M,gOSg "ISN,Cjg1.E: 'F, LLg 69--IdlAI 3Zg sJoqeF uedo ~6/1.8/~1. c-;6/81./0 L OZ 91.8 988 301.EI 'NSLL'9 oeS "I=IAA,Z~9E: '-ISN,Lt~E;6cj09 ~9-_-IdlAI =IZ.~ sJoqe~ uedo 96/1.E:/'&L 96/L8/9 G/_ Z99'~ E~8/_'~ 30LEI 'NffL.±'~8 oeS '.'1E]~,9~ "ISN,Z./-O~~899 ' ~9--IdlAI 3/_~ sJoq~ ................ ~'~'a~ ........................ '~'~7['~"i ...................... ~"[')~ ............... '~ .............................. :"'""~'~ ............................................................................................ '~'~' ...................................... "~*[ ........................................ ['~;'~ ................................... ["~;~ ............... : .................... ~'~"["~"":~'~"FF;'~'~'~";'5'~;'~'";~'~'~;'~'~'~ ................................ ~ ............................. ~:~';'~ ..................... ~'~"'~'~ uado . cj6/1.£/~1. S6/1.8//. 1.81. 1.88'/..I. ~99'Z 1. :101.1:! 'N81..L'9 oes '"F:IM,809~ "ISN,6Z61. 8Z99 Sff--IcllAI ':IZ~ sJOqel~ uedo 96/1.~/~ 1. g6/g/~ L gZ ZSL'6 Z8~'6 30H:I 'NE:1.J.'9 oes "13M, 1.SZ~ "19N,1~661. L999 88--IdlAI :IZ~ sJoqel~ uedo G6/Lg/'& 1. S6/Sg// 9Z. 0/. Z.88'9 gS0'Z 301.1:i 'NSL.I.'g oes "l:l~,gl~gg 'qSN,Lg61. L999 Lg--IdlAI :1£~ s~oqeF uedo 96/ggF~ 1. 96/gg/~ 1. 99 Sgg 0Sg Z.98'6 Z.68'6. :101. H 'Ng 1.1'9 oes "1:1M,9699 "ISN,Z.S91. S0f'8 Sg-.ddl~ 3Z.g sJoqep uedo 96~1./~1. cj6/~ L/-&1. 0/ 99t~'9 989'9 I~lr1301.1:1 'NSLI'90 oes Lt,89 gg-:ldl~l ~l/_g sJoqep uedo 96/1.8~ 1. cj6/61./8 061. ~88 1.1./_'/_ 88~'8 301.1:1 'NE~1./'t~ oes "13M,9~01~ "1SN,E~88~ 9889 cjO-HdlAI 3~ sJoqeh Uedo z6/z1./9 96/z. 1./9 99' 0'6'1. ....... gl~z t6z'91, gZZ'61. 301.t:l 'NS 1./'9 oes "13M, 1.69~ "ISN,6g1.~ 61.6Z 0Z-_-IdiN :1~ sJoqel~ uedo Z6/8/9 96/8/9 0~ ozs'L zoi'z1, z1.z'e1, wn 3o1.a 'N81.1'90 oeS 0699 ~,1.-aaw 3~ s~oq.r, '~edo Z6/S~/1. 96/S~/1. 99'~ ........... snlelS PU3 l~eiS ezeeJ_-I ezee~_-I sp!nl:l sp!nl-I qseM s§lo ~ lelO± reno osec] le§e'l qideci IleM JUl §fly snlnuuv po!Jed leSOds!c] leU!:l tuno uJJelUl Luno UJJO-t uJno IdUJoC) umo 6!.1:1 [uno pnlAJ uJno eoePns IJodeE! eA!lelnuuno 966L JeqtuaoeO I!lUn 966L 'S~/[In[' semnlOA uoqoelul Jelnuuv 6ufl~!~a ~o!~,,s I~qS Shared Sei~vice D~:illing Annl~i~'r injection Volumes July 25, 1995. until December 1998 Cumulative Report Surface Casing Rig Inj Well Depth Nabors 28E B-33 3504' Nabors 28E E-34 3664 Nabors 28E E-36 3648 Nabors 28E E-37 3810 Cum Mud Legal Desc Cum Total & Ctgs 969'SNL, 1898'EWL, Sec 31,111N, RI4E 3,974 2,842 168'SNL, 500'WEL. Sec 6,111N, R14E 9,656 7,228 1706'SNL 822'WEL, Sec 6,111N, R14E 9,271 4.417 3391'NSL 881'WEL. Sec 6,111N, R14E 4,695 4,241 Cum Rig Cum Compl Cum Form Cum Inlerm Cum Final Disposal Period Annulus Wash Fluids Fluids Freeze Freeze Start End Status 857 195 80 5/1/96 12/31/96 Broached 1.420 858 40 110 8/23/95 12/31/95 Open 1,293 3,096 365 100 7/25/95 12/31/95 Open 374 80 9/16/95 1 2/31/95 Open Nabors 28E E-39 3638 3358'NSL 501'WEL, Sec 6,111N, R14E 2,250 928 220 1,022 80 8/28/95 12/31~95 Ol~n.. Nabors 28E G-O4A 3509 2917'NSL 1974'WEL, Sec 12,111N, R13E 5,937 1,798 .. !.!8~t ..... 2.'..3.!...5 ..................... 10/20/95 12/31/95 Open Nab.o[s.28.E ..... G.:~.! ..................... 3.5.0.9 ............. 29!. !.'N.S._!:-.. 2~..6.~?..E.I:-~. S.e.~...!.2...~..T..!. ! N.,.R.!..4E. ................ 11'.~3_.°. ..................... .3..'9.5..6.. .................... 3..,..??. ................... .477_.o_ ................................ 70 62 9/8/95 12/31/o5 Open Nabors 28E s~2~ .................. 2..75? 163~'.S..N....L..4.2..~ .8.'.V~EI~'... ~.e ~. ~5..,.~ !..2 N.,.....R...!.~.E ................. 27.:.2_6..! ......................... !1,773 2,177 5,751 275 285 12/o/95 12/o/96 open Nabors 28E S-33 2958 1639'SNL 1487'WEL, Sec 35,T12N, R12E 18,014 6,613 2,431 8,392 270 308 12/1/95 12/1/96 Open Nabors 28E S-42 3077 Sec 35, T12N, R 12E 168 100 68 3/13/96 3/13/97 Open Nabors 2ES H-35 3157 4535'NSL 1266'WEL Sec 21 T11N R13E 4,860 3,725 555 480 20 80 10/26/95 12/31/95 Open ........................................................................................................................................................................................... '2 ...................... .'. ........................ ; .............. ! ............................................................................................................................................................................................................................................................................................................................................................................. rqabors 2ES H-36 3550 4478'NSL, 1265'WEL, Sec 21,111N, R13E 1,452 857 100 410 85 10/26/95 12/31/95 Open Page 3 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Cammy O. Taylor 6¢~ DATE: January 5, 2002 Chair u~ ~ (~, SUBJECT: Mechanical Integrity Tests THRU: Tom Maunder ~ ~'f'"~_,,.~\~,~;;:~*',. BPX Petroleum Engineer ~.*'~x~ F-pad Wells 26i, 42i, 49i, 70i FROM: Lou Grimaldi Milne Point Unit Petroleum Inspector Kuparuk River Field NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. I I l I T,. i,,13 oo 13 00 13 ,013510 I lntervall 4 'P'.T.D.I 197-08401Type testI M ITestpsiI 1705 ICasingI 910 I 20001 19951 19951 P/F I P Notes: woIIJ F-42i I Typelnj. I P I T.V.D. I 6745 I Tubingl 3510 J' 3510 I 3510 I 3510 J lntervalI 4 P.T.D.I 197-0200 ITypetestl M ITestpsil 1686 I CasingI 900 I 2000 I 1990 I 1990 I P/F I P Notes: WellI F-491 I Typelnj. I P I T.V.D. I 7090 J Tubing J 2880 I 2880 I 2880 I 2880 I lntervalJ 4 P.T.D.I 197-0030 TypetestI M ITestpsil 1773 I Casingl 875 J 2000 J 1995 I 1995j P/F I P Notes: I WellI F-70i I Typelnj. I P I T.V.D. I 6954 I Tubingl 3580 I 3580 I 3580 I 3580 i lntervall 4 P.T.D.I 195-1530 TypetestI M JTestpsiI 1739 I CasingI 150 I 2000 I 1990 I 1980 I P/Fl P NOtes: Type INJ. Fluid Codes F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. P = PRODUCED WATER INJ. N = NOT INJECTING Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test Test's Details Interval I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover O- Other (describe in notes) I witnessed the four year Mechanical Integrity Tests on the above injection wells in the Milne Point Field. A11 wells tested were properly prepped and the tests were concluded successfully. Lee Hulme (BPX rep.) provided all pertinent data and performed a good test on these wells. Well F-4li does not appear to be in compliance with 20 AAC 25.412 (b) which requires that the Packer be within 200 feet (Measured Depth). F-4 li has 10281 feet between packer and upper perforations. I spoke with Lee Hulme and asked him to research if a dispensation or variance had been granted for this. The wellhouses were all very clean and I was impressed with the neatness of the piping on these wells. M.I.T.'s performed: 4 Attachments: Number of Failures: None Total Time during tests: 4 hours cc: MIT report form 5/12/00 L.G. MIT F pad MPU 1-5-02 LG.xIs 1/14i02 Tree: 4 1/8"~ 5M CIW MPU F - 26i Orig. DF elev. = 41.2' (N 22E) Wellhead: 11"x 11", 5M FMC Gen._=____5 .-.. ~---- Orig. GL. elev.= 12.2' w/ 11" FMC Tbg. Hng., 4.5" NSCT~'~!'ii!! I~ RT to tbg. spool = 28.26' (N 22E) lift threads, 4" CIW "H" BPV profile i~' ~o~ ~.~ ~,.-4o I ~' I i,: ~) ~ 5/8' s~s ~[s' cemente~ 2028' md KOP @ 1350' Max. hole angle = 74 to 78 deg. f/4800' to 11,300' , Hole angle through peals = 25 deg.i 9 5/8", 40 ppf, L-80 Btrc. 6065' md ( drift ID = 6.151", cap. = 0.0383 bpf ) 4.5" 12.6 ppf, L-80 Mod ( drift ID = 3.958", cap = .0152 bpf ) =Stimulation Summary None Ii: (w/3.725" no-go) Perforation Summary ~. ,.5"W,E~ I 13,279' ~,M~ I Ref Ioq: 5/25/97 SWS / . USlT/GPJCCLI 7" x 21' marker Jt. f/13,464' to 13,506' Size SPF Interval (TVD) i'~i:: ii!. 3 3/E 6 13582-13592 7102-7112 3 3/E 6 13598-13612 7116-7130 33/'6 '[ S WS 34B Hyperjet 2, 20.5 gm charges @ 60 deg. phasing. 0.40" EHD, 21.9" penetration 7" float collar (PBTD) ]14,036' mdJ 7" casing shoe DATE REV. BY COMMENTS MILNE POINT UNIT 05/21/97 JBF Drilled and Cased by Nabors 22E WELL F-26i 5/27/97 DBR Initial perfs APl NO: 50-029-22767 7/01/97 MDO Completion 4-ES BP EXPLORATION (AK Tree: Cameron 4", 5MMPU F-42i Wellhead: WKM 11" x 11" 5M, Orig. GL Elev. = 12.2 ' FMC w/ 11"x 4.5" Tbg. Hnr. wi . !i i!I RT To Tbg. Spool = 28.2' (N 22E) NSCT threads top and bottom.and : ~.! KOP @ 850' Max. hole angle = 76 to 79 deg. f/ 3,650' to 16,050' Hole angle thru' perfs = 30 deg DLS = 3.4 deg./100' @ 3,500' 4.5" 12.6 ppf, L-80 NSCT tubing ~'i~:i ::i (cap. = 0.0152 bpf, ddft = 3.958") i ( d~t ~D - 6.151', cap. = O.0383 bpf) Minimum tubing restriction = 3.725" "XN" profile @ 18,033' wire. 7"x 4.5" S^BL.-3 Baker Pkr. I Stimulation Summa~ i ~ I i 4.s' ,ES 'XN' npl. 18,033' none pedormed Perforation Summar~ Ref Io~: 3123197 AW$ GR/CCL 7" MARKER JOINTS 1~,258' - 18,299' J Size SPF Interval (-r'VD) 3 3/8" 6 8,425 - 18,465' 7' 34' - 7169' 7" float collar (PBTD) [ 18,705' -- 7" float shoe [ 18,789' DATE REV. BY COMMENTS MILNE POINT UNIT 02/25/97 JBF Drilled cased Nabors 22E WELL F-42i 04/14/97 MDO Completion Nabors 4 ES APl NO: 50-029-22741 BP EXPLORATION (AKI Tree: 4" - 5M CIW .Wellhead: 11" x 4.5" adapter on 11 x 11" 5M FMC Gen 5 tbg. spool w/ 11"x 4-1/2" FMC tubing hanger 4- 1/8" CIW H BPV profile 20" 91.1ppf, H-40casingI 115' MPU F-49i Orig. DF Elev. = 42.0' (N 22E) Orig. GL Elev. = 12.1' DF To 7" hng. = 28.5' (N 22E) 95/8",40ppf, L-80 Btrc. 18,262,I KOP @ 300' Max. hole angle = 69 to 72 deg. f/ 3,900' to 12,000' Hole angle thru' peals = 32 deg Only DLS > 4 deg./100' is 4.3 deg. @ 12,600' 4.5" 12.6 ppf, L-80 BTT tubing ( ddft ID = 3.958", cap. = 0.0152 bpf ) 7" 26 ppf, L-80, NSCC production casing ( drift ID = 6.151", cap. = 0.0383 bpf) Minimum tubing restriction = 3.725" "XN" profile @ 14,020' Stimulation Summary none performed Two 7" x 20' Marker jts. f/14,146' - 14,186' 7" Baker 'S-3" Packer 4.5" HES 'XN' npl. (w/3.725" no-go, 3.813" PB) i13,994' md I 114,019' md I 114,031' mdI Perforation Summary Ref Ioo: GR I CCL 02/17/97 3-3/8'! 6 114,328'-14,338' !7361'-7369' 3-3/8"16 114,379'-14,404'/7403'-7424' 14,344' - 14,364' perfed w/SWS 24 gm. "big hole" charges (EHD = 0.70", TTP = 7.88") at 45 / 135 deg. phasing. 4.5" WLEG 7" float collar (PBTD) 7" float shoe 14,671' mdJ 14,755' mdJ DATE COMMENTS 02 / 09 / 97 Drill and Cased by Nabors 27 E 04/15/97 JBF Initial Completion by Nabors 4ES IREV. BY MDO MILNE POINT UNIT WELL F-49i APl NO: 50-029-22741 EXPLORATI( Tree: 4 1/8"-5M CIW MPU F-70i Wellhead: 11" 5M FMC Gen. 5 w/ Orig. RF elev. = 46.0' (N 27E) 11" x4.5"FMCTbg. Hng.,4.5" I !i~ Orig. GL. elev.= 12.0' RT to tbg. spool = 32.69' (N 27E) NSCT threads top and bottom, 4" CIW "H" BPV profile ~ KOP @ 400' Max. hole angle = 72 to 75 deg. f/ 4400' to 12,000' Hole angle through perfs = 36 deg. ~.~ 9 5/8', 40 ppf, L-80 Btrc. 17085' mdI' ~::~ ..~,: 7" 26 ppi, L-80, NSCC production casing ( drift ID = 6.151", cap. = 0.0383 bpf ) 4.5", 12.6 ppi, L-80 Btrc. tubing (cap. = 0.0152 bpf, drift = 3.958") Minimum tubing restriction = 3.725" "XN" profile @ 14,238' md.~:' ~.~~ 7"Baker'S-3"Packer Jl4,215'mdJ Summary ~ I 4.5" HES 'XN' npl. 114,238' md Stimulation none performed ~!:~ i!I (w/3.725' no-go) Perforation Summary ~ 4.5" WLEG 114,248' md Ref Ioa: 02/29/96 SBT / GR / CCL Siz( SPF Interval (TVD) Two 7" marker jts. 4.5" 5 14,596-14,696' (7269'-7351') f/14,367' to 14,406' wlm 32.0 gm. Alpha Jet charges (EHD = 0.50,-Fi-p= 32.0") @135/45 deg. phasing i:i ii: 7" float collar (PBTD) 114,880' mO 7" casing shoe 114,969, md DATE REV. BY COMMENTS MILNE POINT UNIT 10/26/95 JBF Drilled and Cased by Nabors 27E WELL F-70i 03/03/96 JBF WIW completion by Nabors 4ES APl NO: 50-029-22603 03/24/97 JBF WIW Re-completion by Nabors 4ES BP EXPLORATION (AK) THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03 2001 PL M ATE IA E W L UNDER T H IS M ARK E R C-J~ORJ~V[FILM.DOC PERMIT DATA AOGCC Individual Well Geological Materials Inventory T DATA PLUS Page: 1 Date: 03/12/98 RUN RECVD T 95-153 7063 04/09/96 95-153 95-153 95-153 95-153 95-153 7079 CN/DENS - MD CN/DENS - TVD EWR/GR - MD EWR/GR - TVD SPERRY MWD -77 - /J~O;0 &L/SEPIA ~-/c;j~ ?- ? J-~ k ~L SEPIA //;' -- ~ SEPIA .//k -- 76 ¥~ 05/15/96 02/27/96 02/27/96 02/27/96 02/27/96 95-153 95-153 GRICCL/PERF SBL/GR/CCL ~/SEPIA / ~/~? 0.~ /W 7J'- 1 03/20/96 1 03/20/96 95-153 CHEM CTTR 10-407 ~L'"" 14250 COMPLETION DATE FINAL 04~25~97 DAILY WELL OPS R lO/ ~/ ~J'/ TO ~/ ~//q',~/ Are dry ditch samples required? yes ~ ..... And received? / / / ye s'---rt~---' Was the well cored? Are well tests required? yes Well is in compliance Initial COMMENTS yes ~?Analysis & description received? ~._ Received? ~--~ .... STATE OF ALASKA ALASK,-, OIL AND GAS CONSERVATION L,,JMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: [] Operation Shutdown []Stimulate [] Plugging [] Perforate [] Pull Tubing []Alter Casing [] Repair Well [] Other Replace Packer 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of well: [] Development [] Exploratory [] Stratigraphic 6. Datum Elevation (DF or KBE) KBE = 48' [] Service 7. Unit or Property Name Milne Point Unit 4. Location of well at surface 8. 2189' NSL, 2591' WEL, Sec. 6, T13N, R10E, UM At top of productive interval 2665' NSL, 2815' WEL, Sec. 30, T14N, R10E, UM At effective depth 2786' NSL, 2817' WEL, Sec. 30, T14N, R10E, UM At total depth 2823' NSL, 2818' WEL, Sec. 30, T14N, R10E, UM Well Number MPF-70i 9. Permit Number / Approval No. 95-153 10. APl Number 50- 029-22603 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 14989' feet Plugs (measured) 7636' feet 14880' feet Junk (measured) 7534' feet Length Size 72' 20" 7049' 9 5/8" 14936' 7" Cemented 250 sx Arcticset I (approx) 1380 sx PF 'E', 250 sx 'G' 225 sx Class 'G' 265 sx Class 'G' MD TVD 110' 110' 7085' 4487' 14969' 5161' Perforation depth: measured 14596'-14696' true vertical 7286'-7369' Tubing (size, grade, and measured depth) Packers and SSV (type and measured depth) 4 1/2" 12.6# L-80 to 14246' 7' Baker 'S-3' Packer @ 14215' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation: Subsequent to operation: Representative Dally Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service Water Injection 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Chip Alvord ~ L/ ~t/,~ Title Engineering Supervisor Date .~/:~'~O~..~ / Prepared By Name/Number: Mary Youngers 564-5242 Form 10-404 Rev. 06/15/88 Submit In Duplic,~ SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX/ARCO Well Name: MPF-70i Rig Name: N-4ES AFE# 337901 Accept Date: 03/18/97 Spud Date: . Release Date: 03/27/97 MARCH 19, 1997 ACCEPT RIG @ 1900 HRS ON 03/18/97. PULL BPV, RIG UP HARD LINES FOR WELL KILL, TEST 2000# CIRC BUILD 9.1 BRINE, MIX SOURCE WATER W/9.9 F/WELL. MARCH 20, 1997 ADJ BRINE WT. WELL FLOWING W/9.1 & TAKING FLUID WHILE CIRC ADJ WT TO 9.2 PPG & WELL STATIC. SET TWC ND TREE NU BOP'S. TEST BOP'S TO 250 LOW & 5000 HIGH TEST WAIVED BY BOBBY FOSTER W/AOGCC. PULL TWC, MU LANDING JT & BACK OUT RILDS. ATTEMPT TO PULL HANGER TO FLOOR. TBG CUT APPEARS TO NOT BE A COMPLETE CUT. WORK TBG CONTINUOSLY & WAIT ON SWS FOR NEW CUT. SWS HAD JUST GOT IN FROM JOB & HAD OLD LINE THAT HAD BEEN FISHED OUT OF HOLE @ MPU ON SPOOL HAD TO BE TAKEN OFF TO PREPARE TRUCK FOR JOB, ONLY TRUCK AVAILABLE TRUCK ENROUTE TO LOC. @ 0500 HRS. MARCH 21, 1997 CIRC E-P LUBE INTO NACL @ 2% BY VOLUME & WORK TBG TO 165K. RIG SWS & RIH W/CCL @ 3.5" CHEMICAL CUTTER & GET ON DEPTH & CUT TBG IN JT + 451 @ 14244' POOH & RIG DOWN SWS. LD HANGER & POOH LD 3 Y2" TBG. SET WEAR BUSHING. MU FTA #1 & RIH W/SAME ON 3 ¼" DP FROM SHED. MARCH 22, 1997 CONT TO RIH W/FTA #1 ON 3 Y2" DP FROM SHED TO 14253'. WASH OVER PKR W/FTA #1 FROM 14253-14254' (WELL BORE TAKING 1 BPM LOSS AS SHOE WORE DOWN & FRICTION PRESSURE CAME UP) MIX & SPOT LCM PILL & MON WELL. POOH W/FTA #1 FOR SHOE CHANGE OUT. MARCH 23, 1997 CONT TO POOH W/FTA #1 & CHANGE SHOE, CLEAN BOOT BASKETS (WASH OVER SHOE 100% WORN OUT). MU FTA #2 & TIH TO 14254'. MILL ON PKR @ 12254'& WORK PIPE, UNABLE TO TRAVEL DOWN HOLE AFTER PULLING KBE ABOVE ROTARY TABLE. CIRC BU BEFORE POOH & SMALL AMOUNT OF GAS TO SURFACE @ BU (INDICATE PKR RUBBERS HAD BEEN PENETRATED) ATTEMPT TO WORK BACK TO 14254' & UNABLE TO GO BELOW 14203'. POOH W/FTA #2. CUT DRILLING LINE & REPLACE DIAPHRAM IN SENSOR BLOCK ON WT IND CONT POOH & CHG WASH OVER SHOE (100% WORN OUT). RIH W/FTA #3 (WILL CONT TO MILL OVER PKR. WHERE FOUND & PUSH TO BOTTOM). Page 1 of 2 SUMMARY OF DALLY OPERATIONS MARCH 24, 1997 RIH W/FTA #3 TO 14200' TAG PKR @ 14200 F& PU KELLY, WASH OVER FOR APP 5 MIN PKR FELL & CHASE PKR TO 14582' TOP OF PERFS, WASH OVER PKR NOT MAKING PROGRESS. CIRC BU POOH & REC REMAINDER OF JT # 452' & 8.47' OF PUP ON TOP OF PKR BROKE OFF WHERE 1sT CUT WAS ATTEMPTED (CHEMICAL CUT) WAIT ON OVERSHOT & GRAPPLE. MU FTA #4 & RIH TO 14582', TAG PKR, WASH OVER & ATTEMPT TO LATCH PKR INDICATION ARE DUE TO PSI. INCREASE FISH WAS SWALLOWED TD 14592'. CIRC BU. POOH W/FTA #4. MARCH 25, 1997 CONT POOH & REC. PKR. BHA #5, SCRAPER SPACED TO PERF TOP & MULE SHOE. CUT DRLG LINE. CONT RIH W/SCRAPER & MULE SHOE TO 14852' SCRAPER @ 14552'. POOH LD 3 ½" DP. PULL WEAR RING SET TEST PLUG & CHANGE RAMS TO 4.5" & TEST TO 5000 PSI & PULL TEST PLUG. LOAD PIPE SHED W/4.5" TBG. MU PKR & TAIL PIPE ASSY & RIH W/SAME ON 4.5" TBG. MARCH 26, 1997 CONT RIH COMPLETION 343 JTS 4.5" 12.6" BUTT TBG & BAKER S-3 PK MU HANGER, LAND, RILDS. NU BOP, NU TREE & TEST TO 5000 PSI. DISPLACE WELL W/SOURCE H20 TREATED W/25 GAL COREXIT PER 100 BBL. H20 & FOLLOW W/70 BBL DIESEL & U-TUBE TO TBG. DROP 1 7/8" SETTING BALL & W/30 MIN ATTEMPT TO TEST BALL WOULD NOT FALL TO RHC PLUG. PUMPING DIESEL INTERMITTINGLY TO TEST & CALL OUT HES WIRELINE TRUCK F/DEADHORSE. WHILE WAITING DROPPED 5' 9 ½" x 2 ¼" BAR W/ROLLERS & WAIT 13 MIN, PSI TBG TO 5000'. BALL ON SEAT TBG TEST OK. TBG BLEED TO 4930' IN 30 MIN. BLEED TBG PSI & PSI TBG ANNULUS TO 3500 PSI (NOTE: AT THIS TIME W/5 MIN HOLDING STEADY). MARCH 27, 1997 TEST PKR ANNULUS TO 3500 PSI & PSI BLEED DOWN TO 3460' IN 30 MIN. TEST WAIVED BY JOHN SPAULDING W/AOGCC. RIG LUBRICATOR & SET BPV, SECURE TREE & CELLAR. RIG RELEASED @ 0800 HRS. Page 2 of 2 4/24/97 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10967 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Milne Point (Cased Hole) Well Job # Log Description Date BL RF Sepia LIS Tape M PU E-14 PERFORATION RECORD 970 41 6 I 1 M P U E-18 PERFORATION RECORD 9 70415 1 1 MPU E-19 PERFORATION RECORD 97041 4 I 1 MPU F-701 L.k.~ C... CHEMICAL CUTTER 970320 I 1 MPU F-73 GR/CCL 97031 3 I 1 MPU F-73 PERFORATING RECORD 9 70 31 3 I 1 MPU J-09 T~L.~ ~ CHEMICAL CUTTER RECORD 97041 7 I 1 MPU J-09 . CBL 97041 8 I 1 MPU J-09 PERF RECORD 97041 8 I 1 K-21 PERF RECORD W/GR 9 7031 6 I 1 MPK-21 CBL 97031 6 I 1 MPK-43A H.P.G. GUNS SHOOTING RECORD 97031 9 I 1 MPK-43A STATIC PRESSURE SURVEY W/CPLT 9 7031 9 I 1 MPK-43A CBL 970319 I 1 MPK-43A H.P.G. GUNS PERFORATION RECORD 9 70321 I 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska)Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 Received b ~,"~ STATE OF ALASKA ALASKA u~L AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate 2. Name of Operator 5. Type of well: 6. BP Exploration (Alaska) Inc. [] Development [] Exploratory 7. 3. Address [] Stratigraphic P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Datum Elevation (DF or KB) KBE - 48.15' Unit or Property Name Milne Point Unit Well Number MPF-70i 2189' NSL, 2591' WEL, SEC. 6, T13N, R10E At top of productive interval 2665' NSL, 2815' WEL, SEC. 30, T14N, R10E At effective depth 2787' NSL, 2817' WEL, SEC. 30, T14N, R10E At total depth 2823' NSL, 2818' WEL, SEC. 30, T14N, R10E 9. Permit Number 95-153 10. APl Number 50-029-22603 11. Field and Pool Milne Point Unit/Kuparuk River Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 14989 feet 7636 feet 14880 feet 7534 feet Plugs (measured) Junk (measured) Casing Length Size Structural Conductor 72' 20" Surface 7049' 9-5/8" Intermediate Production 14936' 7" Liner Cemented 250 sx Arcticset I (Approx.) 138o sx PF 'E', 250 sx 'G', 225 sx PF 'E' 265 SX Class 'G' MD TVD 110' 110' 7085' 4488' 14969' 7618' Perforation depth: measured true vertical 14596'-14696' 7286'-7369' f 4AR 0 7 1997 Tubing (size, grade, and measured depth) 3-1/2" 9.3¢ L-80 tubing to 14282' Packers and SSSV (type and measured depth) 7" Baker S-3 Packer at 14262' , ~%~0¢~8 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 4. Estimated date for commencing operation March 8, 1997 16. If proposal was verbally approved Name of approver Date approvec 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Water Injection Contact Engineer Name/Number: Bob Laule, 564-5195 Prepared By Name/Number'. Kathy Campoamor, 564-5122 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~"~_,=,.~~~ Rand~/Thomas ~. -~ Title Drilling Superintendent Date Commission Use Only Conditions of Approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance Mechanical Integrity Test ~ Subsequent form required 10- I Approval No~"~. ,W.~... Approved by order of the Commission, ,.,,.,rr.,,,:~.d Goer · ~tP't"' - 0riglnal .b~gi,~.. Dav!d W. Johnston Commissioner Date Submit i~ Tr~lica'te OBJECTIVE: The objective is to replace the existing 3-1/2" tubing and packer completion with a 4-1/2" completion. This will allow increased injection. SCOPE: · Rig work scope: · MIRU · Pull BPV · Kill Well · Set TWC ND tree NU BOP and test. · Pull tubing · Mill packer and push to bottom · Make casing scraper run · Run 4-1/2" completion · Set TWC ND BOP and NU tree and test · Pull TWC Freeze protect and set the packer. · Release rig. STATE OF ALASKA ALASkJ-~ OIL AND GAS CONSERVATION CuMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1.' Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service Water Injection 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 95-153 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22603 4. Location of well at surface i'~r~'i'?i~?~:"i' ii~' '~? ~.[.C'~-- ~ 9. Unit or Lease Name 2189' NSL, 2591' WEL, SEC. 6, T13N, R10E ~ .r~.-~?,-" ~~;~,-.v~,"l~'~'" i Milne Point Unit At top of productive interval i~... ~/,~/,~~.~_-c~ _-~-- , ,:~' 10. Well Number 2665' NSL, 2815' WEL, SEC. 30, T14N, R10E~ '~"~.,;~'? ~ ~i~-~ MPF-70 Idepth ~ -~ ~ ;-,,:u ~ i~~ i ~,..~~, 11. Field and Pool At tota 2823' NSL, 2818' WEL, SEC. 30, T14N, R10E~-''' ..... Milne Point Unit / Kuparuk River 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands KBE - 48.15'I APL 355018 12. Date Spudded10/06/95 I13' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'l15' Water depth' if °fish°re 16' N°' °f C°mpleti°nsl 0/20/95 03/04/96 N/A VeL One 17. Total Depth (MD+TVD) 118. Plug Back Depth.(MD+TVD)I19. Directional Surveyl20. Depth where SSSV set~l. Thickness of Permafr%t 14989 7636 FTI 14880' 7534 F~ ~Yes I-INo t N/A MD! 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, LWD, Gyro, GR/RES/NEU/DEN, GR/CCL/SBT, GR/JB i23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP Bo'FrOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1# NT80LHE 38' 110' 30" 250 sx Arcticset I (Approx.) 9-5/8" 40# L-80 36' 7085' 12-1/4" 1380 sx PF 'E', 250 sx 'G', 225 sx PF 'E' 7" 26# L-80 33' 14969' 8-1/2" 265 sx Class 'G' ..... .. ..... 24. Perforations open to Production (MD+TVD of Top and Bottom 25. TUBING RECORD and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Gun Diameter, 5 spf 3-1/2", L-80 14282' 14262' MD TVD MD TVD 14596'-14696' 7286'-7369' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protect w/72 bbl diesel 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 05/14/96 I Water Injection Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD · I Flow Tubing Casing Pressure CALCULATED, OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. .. ORIGINAL SEP 27 996 ~..kA 011 & Gas Cons. Commission Form 10-407 Rev. 07-01-80 Anchorage Submit In Duplicate Geologic Mark .... 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. (Subsea) Top Kuparuk 'A' 14563' 7214' Top Kuparuk A3 14571' 7220' Top Kuparuk A2 14592' 7237' Top Kuparuk A1 14621' 7260' RECEIVED 31. List of Attachments Summary of Daily Drilling Reports, Surveys, Annular Pumping Report 32. I hereby certify that the foregoing is tru.e and cq. rr~ect to the best of my knowledge Signed Tim Schofield Title Senior Drilling Engineer . Prepared By Name/Number: Kathy Campoamor, 564-5122 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. .. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 A NN'ULAR INJECTION DATA ENTRY SCREEN A s set .M. iJae ........................................ Rig Name. :blab.er.s.22E ........................... Inj Well Name .M.P.E.:Z.Q .................................. Permit Sur Csg Dep .7...9..1.~t .............. Cumulative Data Legal Desc 2.1_[tg;.~SL,...2.52,.1.'.~,/FL,..S~c...6,,.T..1.3t,J.,...B.1.QE ........................ R esea rc h Start ...... 6.:..1..Z.:.9.G ..... Permit End ...... 6.:.,1..7..:,9.Z ..... Weli::;T0tal :: :i.Mud/C!9:. Wash: :.:..:.:; ,,Flui,dsl :i..:: .;i.. FlUidS:=::~:=: ::::::;;;:::Freeze :. F[egze.: :.:: ....... .... ...: ....... .,..:......:..:.::.. .... ,.....:%,.... I Daily Data : :lMud, ctgs,:cm~: : Inlerrniltant source=;=:: :: :';: Date Of: C0ntam natedt :=:Rig WaSh comPletiOn:: F0rmation;I :Freeze: ::. Fr~eze; :;:: Daily We = nject On Dr g Mud F u ds= :: F Uids [ F u ds PrOteCt onI piOie~[ : TotaI MPF-66 108/26/96 100' ...... 08 / 27 / 96 .]_..;~..0_ _0. ...................................... I ............................ !08/28/96 140 i08/29/96 370 I 0__8_/_3_0_/_9. 6_~ 200 i490 350 355 1,402 60 485 ..1. 55 ]35 i 80 .0._9_/_~0 _9_/9_6_1245 09/1 0/96 .~5 09/11/96 95 .0.9/12/96 190 09/13/96 145 ..0_9/1 4/96 ...2.40 09/1 5/96 _2.1'5 09/1 6/96 225 __ 09/1 7/96 20 09/18/96 190 09/1 9/96 220 09/20/96 09/2 1/96 510 200 3 1500 3 1300 3 1300 3 1300 3 1300 .... 3 1300 __ 3 1300 -- 3 1300 __ -- 3 1300 -- 3 113O0 3 ., 1._3_ 00 ~.5 1300 -- 2.5 1300 _2._5 , ]_2_50 4 1450 3 1350 3 1350 2.5 1350 2.5 1350 -- 2.5 1400 !_2.5 1__400 ~3 1450 .5 1250 .5 1250 !2.5 1450 '!2.5 1450 i2.5 1450 ] 2 .__5 _1450 2.5 1450 I~'.,~ 1450 -- 3 1500 ... 3 1500 3 1500 i1~3 1500 .. 3 1500 _3__ , , ,!,5oo ! ~1..:_5 12Q0 .... MPF-66 MPF-58 MPF-58 09/22/96 300 09/23/96 300 09/24/96 760 09/25/96 540 09/26/96 770 09/27/96~.280 09/28/96 200 09/29/96 :.!60 550 1996 Summar , . iMPF-62 125 190 250 ~00 ~40 235 1,300 11/07/.9_ 5__11 O0 Z'_'ii,-iii"ii ..... I · 1995 Summary ANN INJ MP F-70 Inj. Well Name ~:'~ ~i~i:::;i~ Legal Desc ~ ~i ~ii~ ~ii~ ii ~ ~:~ ~m:'~::~'::~:~:~::~ :'::' ~:. (Sec, T, R) : Surf Csg Dep 791 9 Well Cum Total ~!~i~ ~I ~:!~;?~ Cum Mud/Ctg ~ii~ Cum Brine ~i~ Cum Waterl~~ ~ Cum Dies/FP VOLUME (BBLS' ethod of dispIosal=pumpin~ down outer annulus SOURCE WELL DATE OF MUD/CTGS BRINE WATER DIESEU FREEZE I ..... / NUMB~ INJECTION PROT ~ Dai~y ~um. ~o[a~l COMPLICATIONS, COMMENTS I / UP F-62 1 0 / 2 8 / 9 5 1 2 5 ~ ~ ~= ~ MP F-62 1 0 / 31 / 95 1 90 -[~,~iJJi=~[~,[~iJ~i~iJ~jJ~[[~j~[~[~ ~ MP F-62 11/4/95 235.00 MP F-62 153 .00 ...... UP F-62 11/7/95 100.00 100.00 56.00 ~[~ BP/AAI SHARED SERVICE DAILY OPERATION~ PAGE: 1 WELL: MPF-70 BOROUGH: NORTH SLOPE UNIT: UNKNOWN FIELD: UNKNOWN LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 10/04/95 12:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 27E WO/C RIG: NABORS 27E 10/05/95 (1) TD: 110'( 0) 10/06/95 (2) TD: 110'( 0) 10/07/95 (3) TD: 1137' (1027) 10/08/95 (4) TD: 3400'(2263) 10/09/95 (5) TD: 4100' ( 700) 10/10/95 (6) TD: 6070' (1970) INSTALL TOP DRIVE MW: 0.0 VIS: 0 MIRU. SPOT SUB OVER HOLE. SET PITS & MOTOR MODS. HOOK UP LINES. RIG ACCEPTED @ 1200 HRS., 10/04/95. NU DIVERTER SYSTEM. RU TOP DRIVE. INSTALL TOP DRIVE MW: 0.0 VIS: 0 PULL HOSES FOR TOP DRIVE OVER WIND WALLS & HANG OFF FROM BOARD. REMOVE INSIDE LADDER, HAND RAILS & TONG HOOK. TIE TOP SECTION OF TORQUE TO BLOCKS, CONT TO MU MIDDLE & BOTTOM SECTION & HANG FROM EYE OF CROWN. INSTALL TOP DRIVE. CIRC HYDRAULIC FLUID THRU SYSTEM. TIGHTEN SWIVEL, SET MAX TORQUE. INSTALL BAILS & ELEVATORS. TEST LINK TILT. LD TOP DRIVE SHIPPING CRADLE. INSTALL BALANCE CYLINDERS & MU SAVER SUB & CLAMP. PU DP & STAND BACK IN DERRICK. PU STAND PIPE EXTENSION, NEED ADJUSTMENT, LAYED BACK DOWN. DRILLING MW: 0.0 VIS: 0 MU STANDS OF PIPE. HANG NEW KELLY HOSE & CLAMP OFF. MU STANDS HWDP. STRAP, CALIPER & NU BHA. FUNCTION TEST DIVERTER. UPLOAD MWD. FILL HOLE & CHECK FOR LEAKS. DRILL F/109' T/ 270'. STAND BACK HWDP, PU REST OF BHA. DRILL F/270' T/1137'. DRILLING MW: 0.0 VIS: 0 DRILL F/1891' T/2744'. CIRC HOLE CLEAN. CHECK FLOW. PUMP PILL. POOH T/856'. TIH. PU SINGLES TO GET TO BOTTOM. OK. DRILLING. DRILLING MW: 0.0 VIS: 0 DRILL F/3400' T/3590'. DRILL F/3590' T/3196'. CIRC LO-HI SWEEP, CHECK FOR FLOW. PUMP PILL. POOH TO MWD & DOWNLOAD. POOH, CHANGE BIT. LD MWD TOOL. MU NEW MWD TOOL. ORIENT MWD WITH MOTOR & UPLOAD. CHANGE MIDDLE STABILIZER. RIH WITH HWDP. TAGGED BRIDGE @ 619'. CIRC & WORK THRU. PU DP. RIH T/3864'. TOOK CHECK SHOTS. DRILL F/3916' T/4100' DRILLING MW: 0.0 VIS: 0 DRILL F/4100' T/4156'. CHANGE OUT WASHPIPE IN SWIVEL. DRILL F/4156' T/5571'. CIRC HOLE CLEAN FOR SHORT TRIP. CHECK FOR FLOW, PUMP PILL, BLOW DOWN LINES. POOH T/3861'. TIH W/ 18 JTS. TIH WITH STANDS FROM DERRICK. OK. NO FILL. DRILL F/5571' T/6070' WELL ' MPF-70 OPERATION: RIG : NABORS 27E PAGE: 2 10/11/95 ( 7) TD: 7112' (1042) 10/12/95 (8) TD: 7112' ( 0) 10/13/95 (9) TD: 7112' ( 0) 10/14/95 (10) TD: 7265'( 153) 10/15/95 (11) TD: 8781' (1516) 10/16/95 (12) TD:10550' (1769) CIRCULATE MW: 0.0 VIS: 0 DRILL F/6070' T/7112'. CIRC LO-HI VIS SWEEP. CONDITION MUD FOR SHORT TRIP. PUMP PILL, CHECK FOR FLOW. BLOW DOWN LINES. POOH T/HWDP. CLEAN FLOOR. SERVICE TOP DRIVE. RIH. OK. NO FILL. CIRC LO-HI VIS SWEEP. CIRC HOLE CLEAN. NIPPLE UP BOPE MW: 0.0 VIS: 0 MONITOR WELL, PUMP PILL. POOH. LD BHA. GALDED CONNECTIONS ON 2 DC'S & 1 STABILIZER. DOWNLOAD MWD. FINISH LD BHA. CLEAR FLOOR. RU TO RUN 9-5/8" CASING. MU HANGER, LANDING JT & CEMENT HEAD. CIRC. TEST CEMENT LINES & PERFORM CEMENT JOB. CIP @ 0145 HRS. CHECK FLOATS, LD CEMENT HEAD, LD LANDING JT. ND DIVERTER SYSTEM. RU & PERFORM TOP JOB. CLEAR FLOOR. NU CASING HEAD & TUBING SPOOL. FISHING FOR TONG HANDLE MW: 0.0 VIS: 0 N/U FMC GEN 5 WELLHEAD AND TEST. N/U BOPE. R/U ATLAS WL, RUN GYRO SURVEY, STOPPED AT 4100'. POOH, RE-RUN GYRO, STOPPED AT 4117'. POOH, R/D ATLAS WL. R/U AND TEST BOPE. BHA %3, SLIP HANDLE BROKE AND FELL DOWN HOLE. FISHING FOR TONG HANDLE. DRILLING MW: 0.0 VIS: 0 RECOVER TONG HANDLE FROM TOP OF BIT. NU BOPE. HOOK UP FLOWLINE, CHOKELINE, SET MOUSE HOLE. PULL WB, INSTALL TEST PLUG. HOOK UP LINES. RETEST CHOKELINE &FLANGE BETWEEN TUBING SPOOL & CASING SPOOL. RD TEST EQUIP. INSTALL WB, RILDS. UPLOAD MWD. FINISH MU BHA #3. RIH WITH DP. CUT LINE. CHANGE OUT STUDS DRAWWORKS LINE CLAMP. RIH WITH DP T/6980' BREAK CIRC. CIRC FOR CASING TEST. TEST CASING. DRILL FLOAT COLLAR, SHOE & 30' NEW HOLE. CIRC FOR FIT. PERFORM LOT. DRILL T/7265' DRILLING MW: 0.0 VIS: 0 DRILL F/7165' T/7361'. CIRC SLOW, CLEAN SCREENS, SCREENS BLINDING OFF. MUD RUNNING. DRILL F/7361' T/7456'. CIRC SLOW, CLEAN SCREENS, SCREENS BLINDING OFF. DRILL F/7456' T/8591' CIRC HI-LO VIS SWEEP. CHECK FLOW, PUMP PILL, BLOW DOWN LINES & TOP DRIVE. POOH T/7060'. CHECK FLOW, RIH T/8495' WASH T/8591'. OK. DRILL F/8591' T/8781' DRILLING MW: 0.0 VIS: 0 DRILL F/8781' T/10101'. PUMP LO-HI VIS SWEEP. CIRC HOLE CLEAN. CHECK FOR FLOW, PUMP PILL, BLOW DOWN LINES. POOH T/7553'. CHECK FOR FLOW. RIH DP T/10077'. WASH T/10101' OK. DRILL F/10101 T/10550' WELL : MPF-70 OPERATION: RIG : NABORS 27E PAGE: 3 10/17/95 (13) TD:13093' (2543) 10/18/95 (14) TD:13822' ( 729) 10/19/95 (15) TD:14604' ( 782) 10/20/95 (16) TD:14927' ( 323) 10/21/95 (17) TD:14989' ( 62) 10/22/95 (18) TD:14989' ( 0) 10/23/95 (19) TD:14989' ( 0) DRILLING MW: 0.0 VIS: 0 DRILL F/10550 T/11587'. PUMP LO- HI SWEEP & CIRC HOLE CLEAN. CHECK FOR FLOW, PUMP PILL, BLOW DOWN MUD LINE. POOH T/10160'. CHECK FOR FLOW. RIH. OK. NO FILL. DRILL F/11587' T/13093'. DRILLING/MIXING LCM MW: 0.0 VIS: 0 DRILL F/13903 T/13376'. PUMP LO-HI VIS SWEEP, CIRC HOLE CLEAN. CHECK FLOW. CIRC THRU CHOKE, SHUT IN WELL, CHECK BUILD UP. OPEN WELL, CIRC & COND MUD, LOWER ECD. CHECK FLOW, PUMP PILL, BLOW DOWN LINES. POOH T/il700'. CHECK FLOW. PU DP. RIH OUT OF DERRICK. OK. NO FILL. DRILL F/13378' T/13784'. BUILD MW. SHUT DOWN PUMPS. DRILL F/13378' T/13822'. MIX LOSS CIRC MATERIAL. DRILLING MW: 0.0 VIS: 0 SHUT DOWN PUMPS, WORK PIPE & BUILD PIT VOLUME. MIX LCM. DRILL F/13822' T/13849'. BUILD PIT VOLUME & MIX LCM. DRILL F/13849' T/13913'. BUILD PIT VOLUME. MIX LCM WHILE DRILLING. DRILL F/13913' T/14258'. CIRC SWEEP TO CLEAN HOLE. MONITOR FOR FLOW. PUMP DRY JOB & BLOW DOWN MUD LINE. SHORT TRIP. DRILL F/14258' T/14541'. APPEAR TO HAVE LOST LCM EFFECT WITH SHORT TRIP. BUILD VOLUME & MIX LCM. DRILL F/14541' T/14604'. DRILLING MW: 0.0 VIS: 0 DRILLING F/14604' T/14614'. BUILD VOLUME, REDUCE MUD WEIGHT. CHANGE SHAKER SCREENS. DRILLING F/14614' T/14927' MONITOR WELL MW: 0.0 VIS: 0 DRILLING F/14927' T/14989'. SURVEY & SPR. SD PUMPS & FLOWED MUD TO PITS. CBU. SD PUMP & FLOWED MUD TO PITS. CBU. MUD TEST SAME AS PREVIOUS. SD PUMP & FLOWED. NO CUT, JUST LIGHT. CBU. SD PUMPS & FLOWED. WELL NEARLY STABLE. MONITOR. MONITOR WELL MW: 0.0 VIS: 0 MONITOR WELL WITH PUMPS OFF. CBU. REDUCE RATE. MONITOR WELL WITH PUMPS OFF. CBU. CIRC UNTIL 10 PPG RETURNS. BU MUD CHECK SHOWED CHLORIDE INCREASE. NO OTHER CHANGE. MONITOR WELL WITH PUMPS OFF. CONTACTED JOHN SPAULDING WITH AOGCC CONCERNING BOPE TEST. TEST WAIVED UNTIL HOLE CONDITIONS PERMIT. RU TO RUN 7" CASING MW: 0.0 VIS: 0 MONITOR WELL WITH PUMPS OFF. CBU. SHORT TRIP. NO FILL. OK. CBU. MONITOR WELL. POOH. MONITOR WELL @ SURFACE SHOE & 5 STDS F/BHA. LOST 8 BBLS ON TRIP OUT. LD BHA. DOWNLOAD LWD. PULL WEAR RING. INSTALL TEST PLUG. CHANGE TOP RAMS TO 7". CHANGING BAILS & ELEVATORS. WELL ' MPF-70 OPERATION: RIG ' NABORS 27E PAGE: 4 10/24/95 (20) TD:14989' ( 0) 10/25/95 (21) TD: 0 PB: 0 10/26/95 (22) TD: 0 PB: 0 MONITOR ANNULUS MW: 0.0 VIS: 0 FINISH CHANGE PIPE RAMS TO 7". TEST DOOR SEALS. FINISH RU TO RUN 7" CASING. RUN CASING. FLOAT SHOE @ 14969' & FLOAT COLLAR @ 14880'. CIRC CASING VOLUME @ 3 JTS IN & @ SHOE. MU HANGER & LAND CASING. BREAK CIRC. TEST CEMENT LINE. CEMENT SPACER. DISPLACE WITH DIESEL & SOURCE WATER. BUMP PLUG. TEST CASING. OK. CIP @ 0500 HRS., 10/24/95. FLOATS HELD OK. RD CEMENT EQUIP. ANNULUS FLOWING SLIGHTLY. MONITOR. LD DP IN MOUSEHOLE MW: 0.0 BLOW DOWN LINES, DRAIN & WASH OUT BOP. LD LANDING JT. RD ELEVATOR & BAILS. RU BAILS & DP ELEVATOR ON TOP DRIVE. MU PACKOFF. SET & TEST. OK. MU TUBING HANGER WITH TWC & SET. CHANGE TOP RAMS. BOTTOM VARIABLE. ND MOUSEHOLE. ND BOPE. NU ADAPTER FLANGE & TREE. TEST TREE, TUBING SPOOL LANGE & ADAPTER FLANGE. OK. PULL TWC. SET BPV. RESET MOUSEHOLE. LD DP IN MOUSEHOLE. RELEASED @ 1000 HRS,10/25 MW: 0.0 ND MOUSEHOLE, SECURE CELLAR AREA. SECURE TOP DRIVE. UNHOOK DRIVE HOSES & ELECTRICAL LINES FROM TOP DRIVE. RIG RELEASED @ 1000 HRS., 10/25/95. SIGNATURE: (drilling superintendent) DATE: RECEIVED SEP 27 1996 Alaska 011 & Gas Cons. Commissior~ Anchorage SP SHARED SERVICES DRILLING MILNE PT/MPF-70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH .00 .00 -46.00 100.00 100.00 54.00 200.00 200.00 154.00 300.00 300.00 254.00 400.00 399.98 353.98 DATE OF SURVEY: 102095 MWD SURVEY JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 OPERATOR: BP EXPLORATION COURS INCLN DG MN 0 0 0 1 0 8 0 31 1 12 500.00 499.96 453.96 1 17 600.00 599.93 553.93 1 23 700.00 699.90 653.90 1 40 800.00 799.84 753.84 2 14 900.00 899.75 853.75 2 30 1000.00 999.65 953.65 2 1100.00 1099.53 1053.53 2 1200.00 1199.37 1153.37 3 1300.00 1299.14 1253.14 4 1400.00 1398.80 1352.80 5 1500.00 1498.36 1452.36 1600.00 1597.81 1551.81 1700.00 1697.11 1651.11 1800.00 1796.29 1750.29 1900.00 1895.29 1849.29 42 57 28 10 11 PAGE FT. 5 39 6 19 7 12 7 25 8 45 COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 1950.00 1944.64 1898.64 9 43 2000.00 1993.82 1947.82 11 1 2050.00 2042.83 1996.83 11 46 2100.00 2091.63 2045.63 13 23 2150.00 2140.14 2094.14 14 38 N .00 E .00 .00N .00E S 61.61 W .03 .01S .02W N 30.52 W .14 .08N .llW N 22.65 W .39 .61N .35W N 18.47 W .68 2.04N .86W .00 -.01 .08 .62 2.05 N 15.34 W .10 4.13N 1.49W N 14.73 W .10 6.39N 2.10W N 15.04 W .29 8.97N 2.79W N 13.28 W .56 12.29N 3.62W N 12.68 W .26 16.32N 4.55W 4.15 6.42 9.02 12.35 16.39 2200.00 2188.27 2142.27 16 41 2250.00 2235.97 2189.97 18 10 2300.00 2283.24 2237.24 19 47 2350.00 2330.13 2284.13 20 51 2400.00 2376.64 2330.64 22 9 N 11.86 W .21 20.76N 5.51W N 11.93 W .24 25.59N 6.53W N 16.55 W .58 31.01N 7.92W N 19.98 W .75 37.34N 10.03W N 20.79 W 1.02 45.00N 12.88W 20.85 25.69 31.13 37.49 45.20 2450.00 2422.73 2376.73 2500.00 2468.37 2422.37 2550.00 2513.60 2467.60 2600.00 2558.44 2512.44 2650.00 2602.82 2556.82 N 19.97 W .46 53.86N 16.17W N 18.15 W .71 63.73N 19.57W N 17.99 W .88 74.94N 23.23W N 18.11 W .22 87.05N 27.17W N 16.84 W 1.33 100.48N 31.39W 54 . 11 64.03 75.29 87.46 100.95 N 18.47 W 2.01 108.12N 33.83W N 16.17 W 2.73 116.71N 36.49W N 15.85 W 1.53 126.21N 39.22W N 13.24 W 3.41 136.76N 41.94W N 13.36 W 2.50 148.54N 44.73W 108.63 117.27 126.81 137.39 149.22 N 10.78 W 4.33 161.74N 47.53W N 10.43 W 2.99 176.47N 50.28W N 9.70 W 3.27 192.48N 53.12W N 9.69 W 2.12 209.61N 56.05W N 9.24 W 2.62 227.69N 59.06W 162.46 177.23 193.29 210.45 228.58 23 28 24 41 25 44 26 46 28 5 N 8.64 W 2.68 246.84N 62.07W N 8.14 W 2.45 267.03N 65.05W N 8.61 W 2.14 288.10N 68.15W N 7.75 W 2.20 309.99N 71.29W N 8.40 W 2.71 332.80N 74.53W 247.78 268.01 289.13 311.06 333.91 Oate--~.d~~_~~ SP, 'Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING MILNE PT/MPF-70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102095 MWD SURVEY JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 2700.00 2646.63 2600.63 2750.00 2689.80 2643.80 2800.00 2732.44 2686.44 2850.00 2774.44 2728.44 2900.00 2815.74 2769.74 29 31 31 1 31 57 33 44 34 52 N 7.33 W 3.06 356.66N 77.82W N 6.13 W 3.22 381.69N 80.77W N 5.50 W 1.99 407.68N 83.41W N 6.50 W 3.72 434.65N 86.26W N 4.98 W 2.84 462.68N 89.07W 357.83 382.90 408.92 435.93 464.01 2950.00 2856.42 2810.42 3000.00 2896.69 2850.69 3050.00 2936.66 2890.66 3100.00 2976.13 2930.13 3150.00 3014.83 2968.83 36 13 36 29 37 21 38 20 40 12 N 5.40 W 2.74 491.63N 91.70W N 4.20 W 1.52 521.16N 94.18W N 4.49 W 1.77 551.11N 96.45W N 4.63 W 1.99 581.70N 98.89W N 4.29 W 3.74 613.25N 101.35W 492.99 522.56 552.54 583.16 614.75 3200.00 3052.70 3006.70 3250.00 3089.91 3043.91 3300.00 3126.55 3080.55 3350.00 3162.37 3116.37 3400.00 3197.10 3151.10 41 18 42 30 43 16 45 10 46 49 N 3.00 W 2.77 645.83N 103.42W N 4.10 W 2.80 679.15N 105.50W N 3.59 W 1.69 713.10N 107.78W N 3.83 W 3.83 747.90N l10.03W N 3.04 W 3.49 783.80N 112.19W 647.36 680.71 714.69 749.52 785.45 3450.00 3230.82 3184.82 3500.00 3263.80 3217.80 3550.00 3296.17 3250.17 3600.00 3327.94 3281.94 3650.00 3358.98 3312.98 48 20 49 6 50 11 50 55 52 18 N 3.60 W 3.15 820.65N 114.33W N 2.79 W 1.95 858.17N 116.42W N 4.47 W 3.35 896.19N 118.83W N 4.81 W 1.55 934.68N 121.96W N 6.69 W 4.05 973.66N 125.89W 822.33 859.88 897.93 936.46 975.50 3700.00 3389.34 3343.34 3750.00 3418.94 3372.94 3800.00 3447.66 3401.66 3850.00 3475.40 3429.40 3900.00 3502.26 3456.26 52 55 54 26 55 27 57 7 57 52 N 6.35 W 1.35 1013.14N 130.40W N 7.88 W 3.90 1053.11N 135.40W N 7.99 W 2.05 1093.65N 141.05W N 9.57 W 4.25 1134.75N 147.40W N 8.28 W 2.63 1176.40N 153.94W 1015.04 1055.09 1095.71 1136.90 1178.65 3950.00 3528.06 3482.06 4000.00 3552.78 3506.78 4050.00 3576.51 3530.51 4100.00 3598.85 3552.85 4173.19 3629.67 3583.67 60 60 62 64 65 0 45 34 20 50 N 9.21 W 4.55 1218.72N 160.45W N 8.70 W 1.74 1261.66N 167.22W N 8.97 W 3.67 1305.14N 173.98W N 7.68 W 4.23 1349.39N 180.45W N 6.43 W 2.58 1415.26N 188.60W 1221.07 1264.10 1307.68 1352.03 1418.02 4267.31 3666.08 3620.08 4360.48 3698.17 3652.17 4457.14 3728.42 3682.42 4549.33 3756.16 3710.16 4643.48 3782.53 3736.53 68 71 72 72 74 37 4 26 31 57 N 5.94 W 2.99 1501.54N 197.94W N 5.54 W 2.65 1588.55N 206.69W N 7.21 W 2.17 1679.76N 216.88W N 5.97 W 1.28 1767.09N 226.97W N 3.57 W 3.56 1857.15N 234.48W 1504.43 1591.56 1682.93 1770.41 1860.57 RECEIVED SEP 2 7 1996 /~.las~ Oil & Gas Coos ~m,'.p~s~o. Anchoq~ SPr--'Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING MILNE PT/MPF-70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102095 MWD SURVEY JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 4735.34 3806.70 3760.70 74 31 4833.67 3834.23 3788.23 72 56 4926.74 3861.88 3815.88 72 29 5021.93 3890.85 3844.85 72 4 5114.57 3919.44 3873.44 71 57 N 4.69 W 1.27 1945.54N 240.86W N 4.27 W 1.66 2039.64N 248.23W N .51 W 3.89 2128.41N 251.94W N 1.36 W .95 2219.07N 253.42W N .87 W .52 2307.17N 255.13W 1949.05 2043.25 2132.07 2222.74 2310.86 5210.38 3949.21 3903.21 71 50 5304.47 3978.50 3932.50 71 52 5399.07 4008.14 3962.14 71 35 5494.21 4038.15 3992.15 71 37 5593.23 4068.67 4022.67 72 28 N 2.42 W 1.54 2398.19N 257.75W N 1.17 W 1.26 2487.56N 260.55W N 1.23 W .30 2577.37N 262.43W N 1.25 W .04 2667.64N 264.38W N 1.27 W .85 2761.81N 266.45W 2401.91 2491.31 2581.14 2671.42 2765.62 5685.81 4096.50 4050.50 72 32 5781.77 4125.46 4079.46 72 19 5876.62 4154.48 4108.48 72 2 5971.84 4183.46 4137.46 72 31 6065.85 4210.49 4164.49 74 3 N 1.09 W .20 2850.09N 268.27W N 3.37 W 2.28 2941.49N 271.83W N 3.80 W .53 3031.61N 277.48W N 3.11 W .85 3122.15N 282.94W N 4.00 W 1.87 3212.01N 288.53W 2853.92 2945.36 3035.56 3126.17 3216.10 6160.96 4235.68 4189.68 75 13 6254.91 4259.68 4213.68 75 10 6346.46 4283.33 4237.33 74 54 6442.53 4308.40 4262.40 74 50 6535.88 4333.11 4287.11 74 27 N 3.17 W 1.48 3303.53N 294.26W N 3.69 W .54 3394.20N 299.69W N 3.76 W .30 3482.46N ,305.44W N 4.74 W .99 3574.94N 312.31W N 5.10 W .55 3664.63N 320.03W 3307.70 3398.44 3486.78 3579.36 3669.15 6631.17 4358.62 4312.62 74 28 6728.37 4384.91 4338.91 74 8 6823.42 4411.18 4365.18 73 46 6916.33 4437.65 4391.65 73 7 7011.77 4465.55 4419.55 72 53 N 3,96 W 1.15 3756.15N 327.28W N 4.19 W .42 3849.49N 333.93W N 3.12 W 1.15 3940.64N 339.76W N 3,44 W .77 4029.55N 344.85W N 2,41 W 1.06 4120.70N 349.51W 3760.78 3854.21 3945.45 4034.42 4125.64 7155.54 4508.41 4462.41 72 25 7249.64 4537.00 4491.00 72 12 7345.68 4566.60 4520.60 71 52 7441.89 4596.61 4550.61 71 46 7534.59 4625.89 4579.89 71 23 N 4,53 W 1.44 4257.66N 357.81W N 5,02 W .54 4347.00N 365.27W N 5,16 W .37 4438.00N 373.38W N 3.40 W 1.74 4529.15N 380.20W N 3.38 W .42 4616.95N 385.40W 4262.70 4352.15 4443.27 4534.51 4622.38 7630.48 4656.07 4610.07 71 55 7724.29 4685.63 4639.63 71 20 7820.25 4716.10 4670.10 71 37 7916.07 4746.51 4700.51 71 22 8007.70 4775.03 4729.03 72 21 N 2.44 W 1.08 4707.84N 390.02W N 2.40 W .62 4796.79N 393.78W N 2.52 W .32 4887.70N 397.69W N 2.95 W .50 4978.47N 402.02W N 2.68 W 1.12 5065.44N 406.30W 4713.33 4802.33 4893.29 4984.11 5071.14 SP' '.Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING MILNE PT/MPF-70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102095 MWD SURVEY JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 8100.60 4802.77 4756.77 8194.14 4830.77 4784.77 8289.34 4859.45 4813.45 8384.71 4888.25 4842.25 8475.81 4915.90 4869.90 72 53 72 16 72 40 72 10 72 28 N 2.97 W .64 5153.99N 410.67W N 2.89 W .67 5243.12N 415.23W N 2.63 W .49 5333.79N 419.60W N 2.36 W .58 5424.62N 423.56W N 3.14 W .88 5511.32N 427.73W 5159.74 5248.94 5339.67 5430.55 5517.30 8572.16 4945.18 4899.18 8669.48 4974.88 4928.88 8765.40 5003.15 4957.15 8858.68 5028.20 4982.20 8952.42 5051.87 5005.87 72 7 72 19 73 23 75 26 75 18 N 2.10 W 1.09 5603.01N 431.92W N .62 W 1.46 5695.66N 434.12W N .25 E 1.40 5787.31N 434.41W N 1.48 E 2.55 5877.13N 433.05W N 1.16 E .37 5967.81N 430.96W 5609.05 5701.71 5793.36 5883.15 5973.78 9047.81 5076.59 5030.59 9143.00 5101.22 5055.22 9237.94 5125.54 5079.54 9331.08 5150.23 5104.23 9425.14 5176.07 5130.07 74 39 75 21 74 56 74 18 73 47 N 1.20 E .67 6059.92N 429.07W N 4.60 E 3.53 6151.74N 424.41W N 3.84 E .89 6243.26N 417.66W N 3.72 E .70 6332.87N 411.74W N 2.85 E 1.05 6423.15N 406.55W 6065.85 6157.59 6248.99 6338.50 6428.69 9520.07 5202.97 5156.97 9614.20 5229.19 5183.19 9704.58 5253.07 5207.07 9803.18 5278.94 5232.94 9896.20 5304.06 5258.06 73 17 74 22 74 58 74 35 74 3 N 2.38 E .71 6514.10N 402.40W N 3.45 E 1.58 6604.38N 397.80W N 4.15 E 1.01 6691.35N 392.02W N 3.95 E .43 6786.26N 385.30W N 3.58 E .70 6875.63N 379.42W 6519.56 6609.76 6696.63 6791.42 6880.69 9988.32 5329.73 5283.73 10061.05 5350.49 5304.49 10153.74 5377.49 5331.49 10249.09 5405.91 5359.91 10345.15 5435.25 5389.25 73 34 73 15 72 51 72 27 71 58 N 3.52 E .52 6963.93N 373.94W N 3.60 E .45 7033.50N 369.62W N 4.22 E .77 7121.96N 363.57W N 4.31 E .43 7212.72N 356.80W N 3.49 E .96 7303.98N 350.58W 6968.90 7038.39 7126.75 7217.40 7308.54 10439.32 5464.71 5418.71 10533.41 5494.80 5448.80 10626.73 5524.43 5478.43 10722.16 5553.39 5507.39 10816.75 5581.53 5535.53 71 34 71 7 71 50 72 49 72 33 N 1.85 E 1.71 7393.31N 346.41W N 2.14 E .55 7482.41N 343.31W N 2.18 E .76 7570.83N 339.97W N 2.05 E 1.05 7661.70N 336.62W N 1.30 E .81 7751.97N 333.98W 7397.80 7486.84 7575.20 7666.00 7756.22 10910.40 5609.82 5563.82 11007.10 5638.90 5592.90 11097.02 5664.30 5618.30 11193.13 5690.39 5644.39 11288.08 5716.91 5670.91 72 72 74 74 73 16 43 26 3 30 N .76 E .63 7841.22N 332.37W N 1.96 E 1.28 7933.42N 330.18W N 3.37 E 2.43 8019.56N 326.17W N 2.95 E .59 8111.92N 321.07W N 2.08 E 1.05 8203.00N 317.07W 7845.44 7937.59 8023.66 8115.93 8206.94 RECEIVED SEP 7 1996 Alaska Oil & Gas Cons. Commission; Anchorage SPF Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 SHARED SERVICES DRILLING MILNE PT/MPF-70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102095 MWD SURVEY JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11382.96 5744.15 5698.15 11476.34 5771.23 5725.23 11575.41 5800.10 5754.10 11667.62 5827.41 5781.41 11759.62 5855.16 5809.16 73 7 73 10 72 56 72 36 72 16 N 1.60 E .64 8293.84N 314.15W N 1.41 E .20 8383.18N 311.80W N 1.23 E .29 8477.92N 309.62W N 1.05 E .40 8565.98N 307.87W N .49 E .69 8653.68N 306.69W 8297.72 8387.01 8481.71 8569.73 8657.40 11855.11 5883.96 5837.96 11949.76 5912.33 5866.33 12044.83 5941.47 5895.47 12138.55 5971.26 5925.26 12229.36 6001.07 5955.07 72 37 72 28 71 49 71 6 70 34 N 1.71 E 1.28 8744.71N 304.94W N 2.85 E 1.16 8834.92N 301.35W N 2.04 E 1.07 8925.33N 297.48W N 1.83 E .79 9014.14N 294.48W N 2.14 E .68 9099.87N 291.51W 8748.39 8838.54 8928.88 9017.62 9103.29 12324.38 6032.74 5986.74 12419.20 6064.08 6018.08 12514.85 6095.65 6049.65 12609.85 6127.68 6081.68 12702.72 6159.72 6113.72 70 29 70 54 70 32 70 3 69 35 N 2.48 E .35 9189.38N 287.90W N 2.59 E .46 9278.78N 283.94W N 3.29 E .79 9368.95N 279.31W N 2.56 E .89 9458.27N 274.75W N 1.82 E .90 9545.37N 271.42W 9192.74 9282.07 9372.16 9461.39 9548.43 12795.81 6192.54 6146.54 12890.50 6226.66 6180.66 12984.20 6261.27 6215.27 13079.38 6298.24 6252.24 13174.10 6338.27 6292.27 13267.82 6381.60 6335.60 13299.75 6397.27 6351.27 13386.48 6441.71 6395.71 13486.39 6495.76 6449.76 13580.00 6549.51 6503.51 69 7 68 38 68 0 66 17 63 42 61 12 60 0 58 20 56 7 53 45 N 2.14 E .60 9632.43N 268.41W N 1.58 E .75 9720.71N 265.54W N 1.58 E .68 9807.75N 263.14W N 1.67 E 1.80 9895.41N 260.65W N 2.12 E 2.76 9981.20N 257.82W N 2.11 E 2.68 10064.22N 254 N 2.74 E 4.13 10092.01N 253 N 2.82 E 1.90 10166.39N 249 N 2.98 E 2.23 10250.29N 245 N 3.10 E 2.53 10326.79N 241 9635.43 9723.66 9810.65 9898.26 9984.00 .75W 10066.96 .58W 10094.73 .97W 10169.05 .72W 10252.87 .65W 10329.30 13673.14 6606.18 6560.18 13769.82 6668.37 6622.37 13864.95 6732.85 6686.85 13960.65 6800.19 6754.19 14053.12 6867.14 6821.14 51 16 48 39 45 58 44 34 42 37 N 2.58 E 2.71 10400.59N 237 N 2.28 E 2.71 10474.54N 234 N 1.69 E 2.85 10544.43N 232 N 1.94 E 1.49 10612.38N 230 N 1.30 E 2.15 10676.11N 228 .99W 10403.03 .85W 10476.92 .42W 10546.76 .26W 10614.68 .46W 10678.38 14144.93 6935.08 6889.08 14241.27 7007.27 6961.27 14334.38 7078.87 7032.87 14428.83 7153.14 7107.14 14526.27 7230.25 7184.25 41 54 41 2 38 24 37 54 37 28 N 1.12 E .81 10737.85N N .95 E .89 10801.64N N .97 E 2.84 10861.14N N .62 E .59 10919.48N N .23 W .69 10979.05N 227.15W 10740.08 226.00W 10803.85 225.00W 10863.32 224.19W 10921.65 223.99W 10981.20 SP}-'-~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 6 SHARED SERVICES DRILLING MILNE PT/MPF-70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102095 MWD SURVEY JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 14621.64 7306.72 7260.72 35 54 N .58 E 1.71 11036.02N 14715.38 7384.71 7338.71 31 25 N .95 W 4.86 11087.98N 14810.24 7468.83 7422.83 23 28 N 2.63 W 8.43 11131.65N 14878.56 7532.34 7486.34 19 43 N 1.01 W 5.56 11156.77N 14989.00 7636.30 7590.30 19 43 N 1.01 W .00 11194.03N 223.82W 11038.17 223o95W 11090.12 225.23W 11133.80 226.05W 11158.94 226.71W 11196.20 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 11196.33 FEET AT NORTH 1 DEG. 9 MIN. WEST AT MD = 14989 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 359.11 DEG. SPY--'Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 7 SHARED SERVICES DRILLING MILNE PT/MPF-70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102095 JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -46.00 .00 N .00 E 1000.00 999.65 953.65 20.76 N 5.51 W 2000.00 1993.82 1947.82 116.71 N 36.49 W 3000.00 2896.69 2850.69 521.16 N 94.18 W 4000.00 3552.78 3506.78 1261.66 N 167.22 W .00 .35 .35 6.18 5.83 103.31 97.13 447.22 343.91 5000.00 3884.10 3838.10 2198.21 N 252.92 W 6000.00 4191.92 4145.92 3148.97 N 284.40 W 7000.00 4462.09 4416.09 4109.46 N 349.04 W 8000.00 4772.69 4726.69 5058.11 N 405.96 W 9000.00 5063.94 5017.94 6013.82 N 430.03 W 1115.90 668.68 1808.08 692.18 2537.91 729.83 3227.31 689.39 3936.06 708.75 10000.00 5333.04 5287.04 6975.11 N 373.26 W 11000.00 5636.79 5590.79 7926.64 N 330.41 W 12000.00 5927.48 5881.48 8882.77 N 299.00 W 13000.00 6267.19 6221.19 9822.39 N 262.74 W 14000.00 6828.22 6782.22 10639.98 N 229.33 W 14989.00 7636.30 '7590.30 11194.03 N 226.71 W 4666.96 730.91 5363.21 696.24 6072.52 709.31 6732.81 660.29 7171.78 438.97 7352.70 180.92 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SP, Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 8 SHARED SERVICES DRILLING MILNE PT/MPF- 70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102095 JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .00 -46.00 46.00 46.00 .00 146.00 146.00 100.00 246.00 246.00 200.00 346.00 346.00 300.00 .00 N .00 E .00 S .00 W .02 S .05 W .20 N .17 W .04 N .52 W .00 .00 .00 .00 .00 .00 .00 .00 .00 446.03 446.00 400.00 546.05 546.00 500.00 646.08 646.00 600.00 746.12 746.00 700.00 846.20 846.00 800.00 2 5 7 10 14 .97 N 1.17 W .13 N 1.77 W .48 N 2.39 W .31 N 3.14 W .06 N 4.03 W .03 .02 .05 .03 .08 .03 .12 .04 .20 .07 946.29 946.00 900.00 1046.40 1046.00 1000.00 1146.54 1146.00 1100.00 1246.72 1246.00 1200.00 1346.99 1346.00 1300.00 18 22 27 33 40 .30 N 4.99 W .92 N 5.96 W .96 N 7.04 W .76 N 8.75 W .62 N 11.22 W .29 .09 .40 .11 · 54 .13 .72 .18 .99 .27 1447.39 1446.00 1400.00 1547.88 1546.00 1500.00 1648.50 1646.00 1600.00 1749.28 1746.00 1700.00 1850.14 1846.00 1800.00 49 58 68 80 93 .05 N 14.41 W .34 N 17.78 W .87 N 21.25 W .84 N 25.14 W .33 N 29.21 W 1.39 .41 1.88 .49 2.50 .61 3.28 .79 4.14 .86 1951.38 1946.00 1900.00 2053.23 2046.00 2000.00 2156.06 2146.00 2100.00 2260.56 2246.00 2200.00 2367.00 2346.00 2300.00 108 126 150 179 215 .34 N 33.90 W .85 N 39.40 W .03 N 45.08 W .71 N 50.88 W .61 N 57.07 W 5.38 1.23 7.23 1.86 10.06 2.83 14.56 4.50 21.00 6.44 2475.41 2446.00 2400.00 2586.06 2546.00 2500.00 2699.28 2646.00 2600.00 2815.98 2746.00 2700.00 2937.10 2846.00 2800.00 256 303 356 416 484 .93 N 63.59 W 29.41 8.41 .77 N 70.45 W 40.06 10.65 .31 N 77.78 W 53.28 13.22 .10 N 84.23 W 69.98 16.70 .05 N 90.99 W 91.10 21.11 3061.76 2946.00 2900.00 3191.08 3046.00 3000.00 3326.88 3146.00 3100.00 3472.89 3246.00 3200.00 3628.85 3346.00 3300.00 558.23 639.94 731.61 837.75 957.08 N 97.01 W 115.76 24.66 N 103.12 W 145.08 29.32 N 108.95 W 180.88 35.80 N 115.37 W 226.89 46.01 N 124.02 W 282.85 55.96 SP! Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING MILNE PT/MPF-70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102095 JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3797.08 3446.00 3400.00 3986.13 3546.00 3500.00 4214.12 3646.00 3600.00 4515.50 3746.00 3700.00 4873.58 3846.00 3800.00 1091.26 N 140.71 W 1249.70 N 165.39 W 1452.56 N 192.73 W 1735.00 N 223.60 W 2077.70 N 250.51 W 351.08 68.22 440.13 89.05 568.12 127.99 769.50 201.38 1027.58 258.08 5200.09 3946.00 3900.00 5519.12 4046.00 4000.00 5849.13 4146.00 4100.00 6201.42 4246.00 4200.00 6583.99 4346.00 4300.00 2388.42 N 257.33 W 2691.27 N 264.90 W 3005.52 N 275.74 W 3342.59 N 296.43 W 3710.80 N 324.09 W 1254.09 226.51 1473.12 219.03 1703.13 230.01 1955.42 252.29 2237.99 282.57 6945.07 4446.00 4400.00 7279.11 4546.00 4500.00 7598.04 4646.00 4600.00 7914.48 4746.00 4700.00 8244.23 4846.00 4800.00 4057.01 N 346.50 W 4374.95 N 367.73 W 4677.04 N 388.71 W 4976.96 N 401.95 W 5290.77 N 417.62 W 2499.07 261.08 2733.11 234.04 2952.04 218.94 3168.48 216.43 3398.23 229.75 8574.83 4946.00 4900.00 8929.29 5046.00 5000.00 9315.45 5146.00 5100.00 9677.29 5246.00 5200.00 10045.47 5346.00 5300.00 5605.55 N 432.01 W 5945.44 N 431.42 W 6317.85 N 412.71 W 6665.06 N 393.93 W 7018.61 N 370.55 W 3628.83 230.60 3883.29 254.46 4169.45 286.16 4431.29 261.84 4699.47 268.18 10379.87 5446.00 5400.00 10697.12 5546.00 5500.00 11031.02 5646.00 5600.00 11389.33 5746.00 5700.00 11729.54 5846.00 5800.00 7336.93 N 348.57 W 7637.79 N 337.47 W 7956.25 N 329.40 W 8299.94 N 313.98 W 8625.03 N 306.93 W 4933.87 234.40 5151.12 217.25 5385.02 233.90 5643.33 258.31 5883.54 240.20 12059.34 5946.00 5900.00 12364.12 6046.00 6000.00 12663.37 6146.00 6100.00 12943.43 6246.00 6200.00 13191.56 6346.00 6300.00 8939.11 N 296.99 W 9226.81 N 286.28 W 9508.51 N 272.59 W 9769.95 N 264.18 W 9996.84 N 257.24 W 6113.34 229.81 6318.12 204.78 6517.37 199.25 6697.43 180.05 6845.56 148.14 13394.66 6446.00 6400.00 13574.06 6546.00 6500.00 13735.63 6646.00 6600.00 13883.87 6746.00 6700.00 14024.38 6846.00 6800.00 10173.35 N 249.62 W 6948.66 103.10 10322.00 N 241.91 W 7028.06 79.39 10448.70 N 235.90 W 7089.63 61.57 10558.03 N 232.01 W 7137.87 48.25 10656.66 N 228.90 W 7178.38 40.51 RECEIVED SEP 2 7 199 Almskm Oil & Gas Cons. Comm)ss~o~ Anchorage Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 10 SHARED SERVICES DRILLING MILNE PT/MPF- 70 500292260300 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102095 JOB NUMBER: AK-MM-951051 KELLY BUSHING ELEV. = 46.00 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 14159.59 6946.00 6900.00 10747.64 N 226.96 W 7213.59 35.21 14292.06 7046.00 7000.00 10834.49 N 225.45 W 7246.06 32.47 14419.79 7146.00 7100.00 10913.93 N 224.25 W 7273.79 27.72 14546.12 7246.00 7200.00 10991.12 N 224.03 W 7300.12 26.33 14669.44 7346.00 7300.00 11063.24 N 223.72 W 7323.44 23.32 14785.12 7446.00 7400.00 11121.18 N 224.80 W 7339.12 15.69 14893.07 7546.00 7500.00 11161.67 N 226.14 W 7347.07 7.95 14989.00 7636.30 7590.30 11194.03 N 226.71 W 7352.70 5.63 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS gyro/data M CJ O : LMI g Date_ F-PAD, MPF-?0 MILNE POINT, ALASKA Gyro Muitishot Survey in 9 5/8" casing Survey date: 12 October, 1995 Job number' AK1095G300 RECEIVED SEP 2 ? 1~ Alaska 011 & G~s Cons. Comm'~ss~o~ Anchorage SR300.DOC Gyrodata Incorporated P.O. Box 79389 Houston, Texas 77279 713/461-3146 Fax: 713/461-0920 October 19, 1995 B.P. Exploraton (Alaska) Inc. Petrotechnical Data Center, MB 3-3 900 E. Benson Blvd. Anchorage, AK 99519-6612 Re: F-Pad, MPF-70, Milne Point, Alaska Enclosed please find one (1) original and six copies (6) of the completed survey of Well #MPF-70 We would like to take this opportunity to thank you for using Gyrodaata and we look forward to serving you in the future. Sincerely ,,~ Robert J. Shoup Operations Manager - RS/gr Serving the Worldwide Energy Industry with Precision Survey Instrumentation gyro/data CONTENTS JOB NUMBER :AK1095G300 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. OUTRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR300.DOC gyro/data 1. DISCUSSION, SURVEY CERTIFICATION SHEET SR300.DOC _gyro/data DISCUSSION JOB NUMBER ' AK1095G300 Tool 080 was run in F-pad well number MPF-70 inside of 9 5/8" casing on Atlas 15/32 wireline. The survey was run without problems. SR300.DOC gyro/data SURVEY CERTIFICATION SHEET JOB NUMBER: AK1095G300 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have 'been checked by me and conform to the standards and procedures as set forth by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- ROB SHOUP OPERATIONS MANAGER SR300.DOC gyro/data 2. SURVEY DETAILS SR300.DOC gyro/data SURVEY DETAILS JOB NUMBER: AK1095G300 CLIENT: B.P. EXPLORATION RIG: NABORS RIG 27E LOCATION: Milne Point WELL: MPF-70 LATITUDE: 70.5050 LONGITUDE: W SURVEY DATE: 12-Oct.,1995 SURVEY TYPE : MULTISHOT IN 9 5/8" casing DEPTH REFERENCE: MAX. SURVEY DEPTH: ROTARY TABLE ELEVATION 44.6 asl 4100.0 SURVEY TIED ONTO: N/A SURVEY INTERVAL: 100' and 30' UTM CO-ORDINATES: TARGET DIRECTION: 359.11 GRID CORRECTION: CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: STODDARD SR300. DOC gyro/data 3. OUTRUN SURVEY LISTING SR300.DOC A Gyro da t a D i r e c t i o n a i Survey for B. P. EXPLORATION Job Number: AK1095G300 WELL: F PAD, MPF-70 Location: NABORS 27E, MILNE POINT FIELD, ALASKA Run Date: 12-Oct-95 08:12:35 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 44.6 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 359.110 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i on a i Survey B.P.EXPLORATION WELL: F PAD, MPF-70 Location: NABORS 27E, Job Number: AK1095G300 MILNE POINT FIELD, ALASKA MEASURED DEPTH feet I N C L AZIMUTH VERTICAL DEPTH deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 0.0 0.00 0.00 0.0 0.0 -44.6 0.00 0.0 0.0 0 - 4100 FT. GYRO SURVEY RUN IN 9 5/8" CASING. MEASURED DEPTHS ARE REFERENCED TO THE NABORS 27E R.K.B. Page HORIZONTAL C 0 0 R D I N A T E S feet 0.00 N 0.00 w 100.0 .03 241.61 100.0 -.0 55.4 200.0 .14 329.48 200.0 .1 155.4 300.0 .53 337.35 300.0 .6 255.4 400.0 1.21 341.53 400.0 2.1 355.4 500.0 1.29 344.66 500.0 4.2 455.4 600.0 1.39 345.27 599.9 6.4 555.3 700.0 1.68 344.97 699.9 9.0 655.3 800.0 2.24 346.72 799.8 12.4 755.2 900.0 2.50 347.32 899.8 16.4 855.2 1000.0 2.71 348.14 999.7 20.9 955.1 1100.0 2.95 348.07 1099.5 25.7 1054.9 1200.0 3.47 343.45 1199.4 31.2 1154.8 1300.0 4.18 340.02 1299.1 37.5 1254.5 1400.0 5.20 339.21 1398.8 45.2 1354.2 1500.0 5.65 340.03 1498.4 54.1 1453.8 1600.0 6.33 341.85 1597.8 64.1 1553.2 1700.0 7.21 342.01 1697.1 75.3 1652.5 1800.0 7.43 341.89 1796.3 87.5 1751.7 1900.0 8.75 343.16 1895.3 101.0 1850.7 1950.0 9.72 341.53 1944.7 108.7 1900.1 .03 .14 .39 .68' .10 .10 .29 .57 .26 .21 .23 .59 .75 1.02 .46 .70 .89 .22 1.33 2.01 .0 241.6 .01 S .02 W .1 308.5 .08 N .11 W .7 330.7 .62 N .35 W 2.2 337.2 2.05 N .86 W 4.4 340.2 4.14 N 1.50 W 6.7 341.8 6.40 N 2.10 W 9.4 342.8 8.99 N 2.79 W 12.8 343.6 12.31 N 3.62 W 17.0 344.5 16.34 N 4.55 W 21.5 345.1 20.79 N 5.51 W 26.4 345.7 25.62 N 6.53 %. 32.0 345.7 31.04 N 7.92 W 38.7 345.0 37.37 N 10.03 W 46.8 344.0 45.04 N 12.89 W 56.3 343.3 53.90 N 16.18 W 66.7 78.5 91.2 105.3 113 .3 342.9 63.77 N 19.58 W 342.8 74.97 N 23.23 W 342.7 87.10 N 27.18 W 342.7 100.52 N 31.40 W 342.6 108.17 N 33.84 W A Gyro da t a D i r e c t i o na B~P.EXPLORATION WELL: F PAD, MPF-70 Location: NABORS 27E, Job Number: AK1095G300 MILNE POINT FIELD, ALASKA MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet 1 Survey 2000.0 11.02 343.83 1993.8 2050.0 11.78 344.15 2042.9 2100.0 13.39 346.76 2091.6 2150.0 14.64 346.65 2140.2 2200.0 16.69 349.22 2188.3 117.3 126.9 137.4 149.3 162.5 SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. 2250.0 18.18 349.57 2236.0 2300.0 19.80 350.30 2283.3 2350.0 20.86 350.31 2330.2 2400.0 22.16 350.76 2376.7 2450.0 23.48 351.36 2422.8 177 193 210 228 247 .3 .3 .5 .6 .8 1949.2 2.74 122.3' 342.6 1998.3 1.53 132.2 342.7 2047.0 3.41 143.1 343.0 2095.6 2.50 155.2 343.2 2143.7 4.33 168.6 343.6 2500.0 24.69 351.86 2468.4 2550.0 25.74 351.39 2513.6 2600.0 26.77 352.25 2558.5 2650.0 28.09 351.60 2602.9 2700.0 29.53 352.67 2646.7 268 289 311 334 357 .1 .2 .1 .0 .9 2191.4 3.00 183.5 344.1 2238.7 3.28 199.7 344.6 2285.6 2.10 217.0 345.0 2332.1 2.64 235.3 345'.5 2378.2 2.67 254.6 345.9 2750.0 31.02 353.88 2689.9 2800.0 31.96 354.50 2732.5 2850.0 33.74 353.50 2774.5 2900.0 34.87 355.02 2815.8 2950.0 36.22 354.60 2856.5 383 409 436 464 493 .0 .0 .0 .1 .1 2423.8 2.45 274.9 346.3 2469.0 2.15 296.1 346.7 2513.9 2.19 318.1 347.0 2558.3 2.70 341.1 347.4 2602.1 3.06 365.1 347.7 3000.0 36.49 355.80 2896.7 3050.0 37.36 355.51 2936.7 3100.0 38.35 355.37 2976.2 3150.0 40.21 355.72 3014.9 3200.0 41.31 357.00 3052.8 522 552 583 614 647 .6 .6 .2 .8 .4 2645.3 3.24 390.2 348.1 2687.9 1.97 416.2 348.4 2729.9 3.73 443.2 348.8 2771.2 2.84 471.2 349.1 2811.9 2.75 500.2 349.4 2852.1 1.52 529.7 349.8 2892.1 1.77 559.6 350.1 2931.6 1.98 590.1 350.4 2970.3 3.75 621.6 350.6 3008.2 2.76 654.1 350.9 Page HORIZONTAL COORDINATES feet 116.76 N 36.51 W 126.26 N 39.23 136.81 N 41.95 ~ 148.59 N 44.74 W 161.79 N 47.54 W 176.51 N 50.29 W 192.54 N 53.13 W 209.66 N 56.06 W 227.74 N 59.07 W 246.90 N 62.08 W 267.08 N 65.06 W 288.16 N 68.16 W 310.05 N 71.31 W 332.85 N 74.54 W 356.72 N 77.84 W 381.75 N 80.78 407.73 N 83.43 W 434.70 N 86.27 W 462.74 N 89.08 W 491.69 N 91.71 W 521.23 N 94.19 W 551.18 N 96.47 W 581.76 N 98.91 W 613.32 N 101.36 W 645.90 N 103.44 W A Gyrodat a D i r e c t i ona 1 Survey B.P.EXPLORATION WELL: F PAD, MPF-70 Location: NABORS 27E, Job Number: AK1095G300 MILNE POINT FIELD, ALASKA Page MEASURED I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL SECTION feet SUBSEA DOGLEG CLOSURE DEPTH SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 3250.0 42.50 355.90 30'90.0 3300.0 43.27 356.41 3126.6 3350.0 45.18 356.17 3162.4 3400.0 46.83 356.96 3197.2 3450.0 48.35 356.40 3230.9 680.8 3045.4 2.79 687.4 351.2 714.8 3082.0 1.69 721.3 351.4 749.6 3117.8 3.84 756.0 351.6 785.5 3152.6 3.49 791.9 351.9 822.4 3186.3 3.14 828.7 352.1 679.23 N 105.51 W 713.18 N 107.7[ ~ 747.98 N 110.04 ,~' 783.88 N 112.19 W 820.73 N 114.33 W 3500.0 49.11 357.21 3263.9 3550.0 50.19 355.53 3296.3 3600.0 50.92 355.19 3328.0 3650.0 52.31 353.31 3359.1. 3700.0 52.93 353.65 3389.4 860.0 3219.3 1.95 866.1 352.3 898.0 3251.7 3.34 904.1 352.4 936.5 3283.4 1.56 942.7 352.6 975.6 3314.5 4.05 981.9 352.6 1015.1 3344.8 1.35 1021.6 352.7 858.25 N 116.43 W 896.28 N 118.84 W 934.76 N 121.97 W 973.75 N 125.90 W 1013.23 N 130.41 W 3750.0 54.44 352.12 3419.0 3800.0 55.46 352.01 3447.8 3850.0 57.13 350.43 3475.5 3900.0 57.87 351.72 3502.4 3950.0 60.00 350.79 3528.2 4000.0 60.75 351.30 3552.9 4050.0 62.57 351.03 3576.6 4100.0 64.34 352.32 3599.0 1055.2 3374.4 3.89 1061.9 352.7 1095.8 3403.2 2.05 1102.8 352.7 1137.0 3430.9 4.25 1144.4 352.6 1178.8 3457.8 2.64 1186.5 352.5 1221.2 3483.6 4.55 1229.3 352.5 1264.2 3508.3 1.75 1272.8 352.5 1307.8 3532.0 3.67 1316.8 352.4 1352.1 3554.4 4.22 1361.5 352.4 1053.20 N 1093.74 N 1134.85 N 1176.50 N 1218.83 N 1261.77 N 1305.25 N 1349.51 N 135.40 W 141.05 W 147.41 W 153.95 W 160.46 W 167.2k 173.99 W 180.46 W Final Station Closure: Distance: 1361.52 ft Az: 352.38 deg. A Gyro da t a D i r e c t i on a i Survey. for B. P. EXPLORATION WELL: F PAD, MPF-70 Location: NABORS 27E, MILNE POINT FIELD, ALASKA A Gyro da t a D i r e c t i on a i Survey for B. P. EXPLORATION Job Number: AK1095G300SS WELL: F PAD, MPF-70 Location: NABORS 27E, MILNE POINT FIELD, ALASKA Run Date: 12-Oct-95 08:12:35 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.505000 deg. N Sub-sea Correction from Vertical Reference: 44.6 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 359.110 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro da t a D i r e c t i o n a i Survey B.P.EXPLORATION WELL: F PAD, MPF-70 Location: NABORS 27E, MILNE POINT FIELD, Job Number: AK1095G300SS ALASKA SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG DEPTH DEPTH SECTION SEVERITY feet deg. deg. feet feet deg./ 100 ft. CLOSURE DIST. AZIMUTH feet deg. -44.6 0.00 0.00 0.0 0.0 0.00 0.0 0.0 0 - 4100 FT. GYRO SURVEY RUN IN 9 5/8" CASING. MEASURED DEPTHS ARE REFERENCED TO THE NABORS 27E R.K.B. Page HORIZONTAL COORDINATES feet 0.00 N 0.00 F 100.0 .08 280.80 144.6 .0 .08 200.0 .32 332.99 244.6 .3 .25 300.0 .84 339.21 344.6 1.3 .52 400.0 1.25 342.93 444.6 3.0 .42 500.0 1.34 344.93 544.6 5.2 .10 600.0 1.52 345.13 644.6 7.6 .18 700..0 1.93 345.75 744.6 10.5 .41 800.0 2.36 346.99 844.6 14.2 .43 900.0 2.60 347.69 944.6 18.4 .24 1000.0 2.82 348.11 1044.6 23.1 .22 1100.0 3.18 345.99 1144.6 28.2 .39 1200.0 3.80 341.90 1244.6 34.0 .66 1300.0 4.65 339.65 1344.6 41.0 .87 1400.0 5.41 339.59 1444.6 49.3 .76 1500.0 5.97 340.88 1544.6 58.8 .57 1600.0 6.74 341.93 1644.6 69.4 .79 1700.0 7.32 341.95 1744.6 81.2 .57 1800.0 8.08 342.51 1844.6 94.1 .76 1900.0 9.72 341.53 1944.6 108.7 2.01 2000.0 11.84 344.24 2044.6 127.2 1.59 .1 271.5 .7 318.4 2.2 333 .6 4.4 338.5 6.7 340.9 9.4 342.2 12.8 343.1 17.0 344.0 21.5 344.8 26.4 345.4 32.0 345.7 38.7 345.4 46.8 344.5 56.3 343.7 66.7 343.1 78.5 342.9 91.2 342.7 105.3 342.7 113.3 342.6 143.1 342.7 .04 N .06 W .32 N .21 W 1.26 N .58 W 2.99 N 1.14 W 5.15 N 1.77 W 7.56 N 2.41 W 10.47 N 3.16 W 14.12 N 4.03 W 18.34 N 4.98 W 22.96 N 5.97 W 28.07 N 7.16 W 33.91 N 8.88 W 40.87 N 11.34 W 49.11 N 14.40 W 58.49 N 17.76 W 69.05 N 21.30 W 80.78 N 25.12 W 93.65 N 29.24 W 108.16 N 33.84 W 126.64 N 39.33 W A Gyro d a t a D i r e c t i on a i Survey B.P.EXPLORATION WELL: F PAD, MPF-70 Location: NABORS 27E, MILNE POINT FIELD, Job Number: AK1095G300SS ALASKA Page SUBSEA I N C L AZIMUTH VERTICAL DEPTH DEPTH feet deg. deg. feet VERTICAL DOGLEG CLOSURE SECTION SEVERITY DIST. AZIMUTH feet deg./ feet deg. 100 ft. HORIZONTAL COORDINATES feet 2100.0 14.83 346.88 2144.6 2200.0 18.48 349.70 2244.6 2300.0 21.26 350.45 2344.6 2400.0 24.06 351.60 2444.6 2500.0 26.45 351.98 2544.6 150.5 2.67 168.6 343.3 180.2 3.05 199.7 344.2 216.1 2.27 235.3 345.2 257.5 2.56 274.9 346.1 304.3 2.18 318.1 346.9 149.81 N 45.00 179.43 N 50.81 215.27 N 56.99 W 256.55 N 63.50 W 303.27 N 70.33 W 2600.0 29.46 352.62 2644.6 2700.0 32.47 354.21 2744.6 2800.0 35.83 354.72 2844.6 2900.0 37.56 355.48 2944.6 3000.0 41.07 356.72 3044.6 356.7 3.04 365.1 347.7 416.8 2.48 443.2 348.5 484.6 2.77 500.2 349.3 558.7 1.81 590.1 350.1 640.4 2.98 654.1 350.8 355.58 N 77.68 W 415.51 N 84.24 W 483.23 N 90.94 W 557.29 N 96.95 W 638.87 N 102.99 W 3100.0 44.23 356.29 3144.6 3200.0 48.66 356.74 3244.6 3300.0 51.66 354.19 3344.6 3400.0 55.35 352.02 3444.6 3500.0 60.50 351.13 3544.6 3554.4 64.34 352.32 3599.0 732.2 2.77 756.0 351.5 838.0 2.64 866.1 352.2 957.4 2.89 981.9 352.6 1091.3 2.25 1102.8 352.7 1249.8 2.68 1272.8 352.5 1352.1 4.22 1361.5 352.4 730.64 N 836.32 N 955.58 N 1089.29 N 1247.39 N 1349.51 N 108.92 W 115.20 W 124.07 W 140.43 W 164.96 W 180.46 W Final Station Closure: Distance: 1361.52 ft Az: 352.38 deg. gyro/data 4. QUALITY CONTROL SR300.DOC Quality Control Comparisons B.P.EXPLORATION WELL: F PAD, MPF-70 Location: NABORS 27E, MILNE POINT FIELD, ALASKA Job Number : AK1095G300 / AKt095G300 INRUN/OUTRUN Comparison INRUN OUTRUN Depth Inc Inc Delta 500.0 1.33 1.29 .040 1000.0 2.78 2.71 .071 1500.0 5.72 5.65 .063 2000.0 11.00 11.02 -.024 2500.0 24.69 24.69 .008 3000.0 36.50 36.49 .005 3500.0 49.09 49.11 -.021 INRUN Az 344.74 348.65 340.17 344.53 352.06 356.42 357.58 For Inclinations Greater than 10 degrees: Average Inclination Difference = -.0080 deg. Average Azimuth Difference = .47449 deg. OUTRUN Az 344.66 348.14 340.03 343.83 351.86 355.80 357.21 Delta .084 .514 .134 .701 .203 .620 .375 gyro/data QUALITY CONTROL REPORT JOB NUMBER: AK1095G300 TOOL NUMBER: MAXIMUM GYRO TEMPERATURE' 080 75.9c MAXIMUM AMBIENT TEMPERATURE · 62.9 c MAXIMUM INCLINATION: 65.29 AVERAGE AZIMUTH: 352.38 WIRELINE REZERO VALUE: no correction REZERO ERROR / K: n/a CALIBRATION USED FOR FIELD SURVEY: 8/21/95 CALIBRATION USED FOR FINAL SURVEY: 8/21/95 PRE JOB MASS BALANCE OFFSET CHECK: .27 POST JOB MASS BALANCE OFFSET CHECK]: CONDITION OF SHOCK WATCHES .19 USED .20 UPON ARRIVAL AT RIG: OK UPON COMPLETION OF SURVEY: OK UPON RETURN TO ATLAS OK BOTTOM LINE COMPARISONS: M.D. INC AZIMUTH TVD NORTHING EASTING FIELD SURVEY 4100 64.34 352.32 3599.0 1349.5N 180.5W FINAL SURVEY 4100 64.34 352.32 3599.0 1349.5N 180.46W SR300.DOC gyro/data FUNCTION TEST JOB NUMBER: AK1995G300 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft I 2 3 4 5 3400 46.8 46.8 46.8 46.8 46.8 AZIMUTH M.D. ft I 2 3 4 5 356.5 356.7 357.0 356.9 357.1 357.0 SR300.DOC gyro/data 5. EQUIPMENT AND CHRONOLOGICAL REPORT SR300.DOC gyro/data EQUIPMENT REPORT JOB NUMBER: AK1095G300 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 080 GYRO SECTION A0098 DATA SECTION A0032 POWER SECTION A0027 BACKUP TOOL No. 731 GYRO SECTION A0054 DATA SECTION A0025 POWER SECTION A0052 COMPUTER POWER SUPPLY PRINTER INTERFACE COMPUTER POWER SUPPLY PRINTER INTERFACE A0153 A0074 A0079 A0071 A0122 A0074 A0082 A0035 WIRELINE COMPANY: CABLE SIZE: ATLAS WIRELINE 15/32 RUNNING GEAR 3.0" System TOTAL LENGTH OF TOOL: MAXIMUM O.D.: 17.5 feet 3.12 INCHES TOTAL WEIGHT OF TOOL: 210 Lbs SR300.DOC gyro/data CHRONOLOGICAL REPORT JOB NUMBER · AK1095G300 10/11/95 1300 10/12/95 0430 0900 1115 1400 1400 1430 10/13/95 1300 ARRIVE ON THE SLOPE LEAVE FOR MILNE POINT. PU TOOL. ZERO TO r.k.b... START INRUN. pull out of the hole and add weight stopped at the same place. pooh. Stand by. Job Canceled. RECEIVED SEP 27 1996 Alaska 011 & Gas Cons. Commission Anchorage SR3OO.DOC ~ ' STATE OF ALASKA ALASKA ..,~L AND GAS CONSERVATION COivi~vllSSlON APPLICATION FOR SUNDRY APPROVAL 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Vadance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Annular Pumping 2. Name of Operator Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. KBE = 48.15' 7. Unit or Property Name Milne Point Unit 4. Location of well at surface 2189' NSL, 2591' WEL, SEC. 6, T13N, R10E At top of productive interval 2665' NSL, 2815' WEL, SEC. 30, T14N, R10E At effective depth 2786' NSL, 2817' WEL, SEC. 30, T14N, R10E At total depth 2823' NSL, 2818' WEL, SEC. 30, T14N, R10E 5. [] Development [] Exploratory [] Stratigraphic [] Service 8. Well Number MPF-70 9. Permit Number 95-153 10. APl Number 50-029-22603 11. Field and Pool Milne Point Unit / Kuparuk River Sands 12. Present well condition summary Total depth: measured 14989 feet true vertical 7636 feet Effective depth: measured 14880' feet true vertical 7534 feet Casing Length Size Structural Conductor 80' 30" Surface 7047' 9-5/8" Intermediate Production 14937' 7" Liner Plugs (measured) Junk (measured) ORIGINAL Cemented 250 sx Arcticset I (Approx.) 138o sx PF 'E', 250 sx 'G', 225 sx PF 'C' 265 SX Class 'G' MD 110' 7085' 14969' TVD 110' 4487' 7617' Perforation depth: measured 14596'-14696' true vertical 7286'-7369' Tubing (size, grade, and measured depth) 3-1/2", L-80 to 14282' Packers and SSSV (type and measured depth) Baker S-3, 7" Packer at 14262' RECEIVED JUN 1 ,~ 1996 Nask~ Oil & Gas ConS. Commission Anchorage 13. Attachments [] Description summary of proposal [] Detailed operations program [] BOP sketch 14. Estimated date for commencing operation 06/15/96 16. If proposal was verbally approved 15. Status of well classifications as: [] Oil [] Gas [] Suspended Service Water Injection Name of approver Date approved Contact Engineer Name/Number: James Robertson, 564-5159 Prepared By Name/Number Kathy Campoamor, 564-5122 17. I hereby certify that the foregoin~ is t~rueandl~c~)rrect to the best of my knowledge Signed ~ ' Tim Schofield ~ ~ Title Senior Drilling Engineer (,/ Commission Use Only Conditions of Approval: Notify Commission so representative may witness Plug integrity_ BOP Test __ Location clearance Mechanical Integrity Test __ Date I Approval No.~ (..o - i~ ~ Subsequent form required 10- ~c'7' ¢~4r4~ o/~~(; t~.~dr'/r Approved by order of the Commission Form 10-403 Rev. 06/15/88 ¢np, mal Signed By 0avid W, Johnston _~lp.~l~is~jo~r Returned Date Submit Jn Tril~lic~te SUMMARY OF DALLY OPERATIONS SHARED SERVICES DRILLING - BPX / ARCO Well Name: M P F-70 Rig Name: 4 E S AFE: Accept Date: 02/27/96 Spud Date: Release Date: 3301O9 03/04/96 Feb 28 1996 MIRU, Berm & trim herculite. Rig lines to tree in cellar. Check well for PSI. ND tree & NU BOP's, install rams & test. Test waived by Bobby Foster w/AOGCC. Load pipe shed & RIH with BHA #1 from shed on 3-1/2" tbg. Rig accepted 02/27/96 @ 1500 hrs. Feb 29 1996 Cont PU tbg to 14874'. Wait on tbg. Test csg. Perform csg wash & displace well. Mar I 1996 Cont to displace well. POOH & LD BHA. Test csg. Rig Atlas & RIH with GR/CCL/SBT t/14892' loggers TD & run to 13890' TOC. Very good cmt up to 14070'. Fair cmt 14070'-13890'. RU shooting flange & lub & test. Run #1, 4-1/2" 20' gun & perf 14696'-14676'/Run #2, 20' gun. RIH t/14681' to flag & PU to correlate in & gun line wt. Normal drag up & pulled out of rope socket. Set to pull out. RD Atlas. RD shooting flange & NU flowline. Load & strap DC. Wait on Baker fishing tools & PU DC. Mar 2 1996 MU FTA #1 & RIH on tbg. Tag fish @ 14845' & engage overshot & reverse CBU after shearing pump out sub. TOH & LD 30 jts tbg. LD BHA & disarm guns. LD same & fishing tools. RD flow nipple & RU shooting flange & lub & test. Gun run #2 perf 14656'-14676', 5 spf. -- Mar 3 1996 Perf in 4 gun run f/14656'-14596', 5 spf. Had 1 bad run that developed a short. Made 2 runs with 5.9" GR/JB t/14400'. Recovered gun debrie. RD Atlas. ND flange & NU flowline. MU Baker 7" sab-3pkr & RIH on tbg. MU hanger & land tbg & RILDS. Mar 4 1996 ND BOP's & NU tree & test. Hgr pull TWC. Test lines & rev circ annulus volume & add corexit & follow w/72 bbl diesel. U-tube diesel to tbg. Drop rod & ball to set pkr & attempt to pump down. Rig Camco & RIH with blind box & set ball & rod in RHC test to verify ball on seat. POOH & RD Camco. Set pkr & tbg. OK. Bleed tbg & test annulus. Witness waived by John Spaulding w/AOGCC. Blow down lines & install BPV & secure well & cellar. Rig released 03/04/96 @ 0200 hrs. -- Request to AOGCC for Annular Pumping Approval for MP F-70: CONTACT: James Robertson 564-5159 1. Approval is requested for Annular Pumping into the MP F-70, 9-5/8" x 7" casing annulus. After reviewing records it has been determined that: MP F-70 ALREADY HAS A PROBLEM FREE ANNULAR INJECTION TRACK RECORD HAVING A CUMULATIVE TOTAL OF 6,643 BBL OF INJECTION. THERE ARE NO OTHER WELLS WITHIN 300' OF THE SHOE THE CASING SHOE MEETS THE SHARED SERVICES DRILLING SET DEPTH CRITERIA. NO WORKOVERS HAVE BEEN DONE ON THE WELL NO CASING WEAR PROBLEM SHOULD BE PRESENT SINCE THE WELL WAS DRILLED POST 1994 WITH ARNCO 200XT HARDBANDING. FULL RETURNS WERE RECEIVED DURING SURFACE CASING CEMENTING. ~.~c- Yo ~'~ r_,,. THE CALCULATED TOP OF THE TAIL CEMENT IS +_200 TVD FT ABOVE THE BASE OF THE SCHRADER BLUFF SAND. 2. The base of the Permafrost for all wells located in the Milne Point Unit is _+1,850' TVD. Aquifers in the Milne Point Unit have been exempted from Class II injection activities by the AOGCC by Aquifer Exemption Order #2 as referenced in Area Injection Order #10. There are no domestic or industrial use water wells located within one mile of the project area. 3. The 9-5/8" casing shoe is set at 7,085' md (4,487' tvd ss) which is a minimum of 500' tvd below the Permafrost and into the Seabee/Colville formation which has an established history of annular pumping at Milne Point. 4. There are _+25 wells on Milne Pt. 'F' Pad. There may be additional unidentified wells within one quarter mile distance from the subject well. There are no domestic or industrial water use wells located within one mile of the project area. 5. The wastes to be disposed of during drilling operations can be defined as "DRILLING WASTES". 6. The burst rating (80%) for the 9-5/8" 40# L80 casing is 4600 psig while the collapse rating (80%) of the 7" 26# L80 casing is 4325 psig. The break down pressure of the Seabee/Colville formation is 13.5 ppg equivalent mud weight. The Maximum Allowable Surface Pressure while annular pumping regardless of fluid density is 2000 psi as per Shared Services Drilling "Recommended Cuttings Injection Procedure". 7. A determination has been made that the pumping operation will not endanger the integrity of the well being drilled by the submission of data to AOGCC on 7/24/95 which demonstrates the confining layers, porosity, and permeability of the injection zone. 8. The cement design for this well ensures that annular pumping into hydrocarbon zones will not occur. RECFIVED Al~ot~ulat~o ANNULAR INJECTIC DO NOT EXCEED 35,000 BBLS IN ANY ANNULUS. MAXIMUM EXPECTED FLUID DENSITY IS 17.0 PPG BURST PRESSURE 9-5/8" 40# L-80 CASING: COLLAPSE 7", 26#, L-80 CASING: 9-5/8" SURFACE CASING SHOE DEPTH: HYDROSTATIC PRESSURE @ 4,487 5750 PSI JUbl '1 5 't996 5410 PSI ' 7., Jgi~s[~,._0iJ .& Gas ,Cons. Commission ,u o Mu/4,C 0r'[F¢) ss TVD WITH VARIOUS DENSITY FLUIDS: (0.052) X (4475) X (FLUID DENSITY) = HYDROSTATIC PRESSURE 80% OF 7" COLLAPSE PRESSURE = (5410 PSI) X (0.8) = 4328 PSI MAXIMUM ALLOWABLE INJECTION PRESSURE 2000 PSI AT ANY PPG SURFACE CASING SHOE DEPTH (TVD ss): 4,4 8 7 HYDROSTATIC MAXIMUM ALLOWABLE PRESSURE AT SURFACE 7" COLLAPSE ANNULAR INJECTION FLUID DENSITY CASING SHOE DEPTH PRESSURE (80%) SURFACE PRESSURE (PPG) (PSI) (PSI) (PSI) 8 1866.59 4328 2000 9 2099.92 4328 2000 1 0 2333.24 4328 2000 1 1 2566.56 4328 1761 1 2 2799.89 4328 1528 1 3 3033.21 4328 1295 1 4 3266.54 4328 1061 1 5 3499.86 4328 828 1 6 3733.18 4328 595 1 7 3966.51 4328 361 Disposal: 1 ) Cuttings Utilize Milne Point Reserve Pit at "A" Pad. Refer to Milne Point Field Operating Procedures/Beneficial Product Reuse and Waste Management Procedures for specifics. Please be aware that: 2) · Pre-approval by the A-Pad Operator is required prior to off loading · Fluid Transfer permit is required prior to off-loading · Contact Milne Point Environmental (Neil or Vic) at x6473 for assistance prior to sending. Class II Fluids 22E may use annular disposal as per normal procedure. We (BPX) DO have a Ballot Sharing agreement with Kuparuk (Ballot KRU 236) which allow for disposal of exempt, Class II liquid waste. Therefore, the Class II disposal well at Kuparuk may be used for liquid Class II (downhole) material from Milne. MPU Environmental Techs will be trained as Certified Waste Generators for the bridge-out period, so coordinate all Kuparuk well disposal activities with Nell andVic. Note: The Kuparuk Disposal well has a solids limitation of <2%. If frac sand can not meet this limitation, pits will be constructed to contain the material. 3 ) Class I Fluids. Pad 3 will not be accessible during breakup. Temporary pits will be constructed to contain cement rinsate if the rinsate can not be annular injected. Contact NeilNic prior to placing material in the pits. Re- Use these fluids as appropriate. Boiler Blow-down has been approved to be re- used as mud make-up water. Cement rinsate Re-use options must be approved on a case-by case basis from MPU Environmental. 3100 3000 2900 2800 2700 2600 2500 2400 2300 2200 2100 1900 1800 1700 1500 ~500 taO0 1300 1200 1100 1000 9OO 80O 700 6OO 500 400 300 2OO lO0 0 CASING AND LEAK-OFF FRA~ i'URE TESTS Well Name: MP F-70 Supervisor: JIM GAFFANEY Date: 10/14/95 Casing Size and Description: 9 5/8" 40#, L-80 BTC Casing Setting Depth: 7085 TMD 4487' New Formation Depth: 7122' TMD 4498' Mud Weight: ~' 8.5 ppg EMW = Leak-off Pr.e.s. sure (PLO) 0.052 x TVD EMW= 1220psi/(0.052x4498'ff)+8.Sppg ~,~ ~ (~ 1~7~:Dr~, EMW= .1.3..7 ppg. ~P'~'~',/ :- l'J..%'v~ '] TVD : TVD + MW 0 2 4 6 8 I0121416182022242628303234363840424446485052S4,~658606264666:870 STROKES I-II:III_LING cl ~: I~! ~/I I-- I:::: S WELL LOG TRANSMITTAL To: State of Alaska May 15, 1996 Alaska Oil and Gas Conservation Comm. Attn.: Records Keeper 3001 Porcupine Drive Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - MPF-70 AK-MM-951051 The technical data listed below is being submitted herewith. Please acknowledge receipt by remming a signed copy of this transmittal letter to the attention of.' Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. APIg: 50-029-22603-00 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 ° Fax (907) 563-7252 A Dresser Industries, Ino, Company LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 21 March 1996 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 LDWG TAPE+LIS 1 LDWG TAPE+LIS 1 LDWG TAPE+LIS Run # 1 Run # 1 Run # 1 ECC No. 6603.00 6609.00 6616.00 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518  to (907) Received bye/ >~ / ' \~ 563-7803 Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE: 5 March 1996 Transmittal of Data ECC #: 6609.00 Sent by: HAND CARRY Data: SBT/GR Dear Sir/Madam, Reference: BP MILNE POINT / KUPARUK NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: 1 SBT FINAL BL+RF Run # 1 1 PFC/PERF FINAL BL+RF Run # 1 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: ~~ Date: ~,~ka Oil & Gas Cons. Commission Anchorage OF:IICI--lNG S G I~! I./I r" ~ S WELL LOG TRANSMITTAL To; State of Alaska Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Dr. Anchorage, Alaska 99501 ! MWD Formation Evaluation Logs - MP F-70, AK-MM-951051 February 27, 1996 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 '~2~' x 5" MD Resistivity and Gamma Ray Logs: ,~/ 2"x 5" TVD Resistivity and Gamma Ray Logs: ~2" x 5" MD Neutron and Density Logs: ~2" x 5" TVD Neutron and Density Logs: 1 Rev. Folded Sepia 1 Blueline (:..': 5~?: "'%'79 1 Bluel~e 1 Rev. Folded Sepia 1 Blueline 1 Rev. Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company MEMORANDUM TO: David Jo~~ Chairmap~- Wondzeil,~~J THRU: Blair P. i. Supervisor FROM: Doug Amo Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: October 12, 1995 FILE NO: awqhjlcd.doc SUBJECT: B©PE Test Nabors 27E BPX MPU MP F-70 Kuparuk Rv. Field PTD No. 95-153 Thursday, October 12, 1995: I traveled to BPX MPU well MP F-70 to witness the BOPE Test on Nabors Rig No. 27E. I was called out at 11:00 AM to witness the test, when I arrived on location I found Atlas Wireline in the process of running a directional survey for the 4th time. There was a tight spot in the casing at approximately 4,400' that the survey toot could not pass through, this delayed the BOPE test until 3:00 PM. As the attached AOGCC BOPE Test Report indicates the test went smoothly. The actuator on the Kill Line HCR valve failed and was replaced, the valve tested good. The drilling pad was well organized with ample room for other equipment should the need arise. The rig crew was very experienced and knowledgeable about the test procedure. SUMMARY: Witnessed the BOPE Test at BPX MPU MP F-70 well on Nabors Rig 27E. 4.0 Hours Test Time, 24 Valves Tested Attachment: AWQHJLCD.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Drlg Contractor: Operator: Well Name: Casing Size: 9 5/8" Test: Initial X Workover: NABORS Rig No. 27E PTD # BP Exploration Rep.: MP F-70 Rig Rep.: Set @ 7,048 Location: Sec. Weekly Other DATE: 10/12/95 95-153 Rig Ph.# 659-4373/84 Jim Gaffeney L. Linder 6 T. '13 N R. 10 E Meridian Umiat TEST DATA MISC. INSPECTIONS: Location Gen.: OK Housekeeping: OK (Gen) PTD On Location Yes Standing Order Posted Yes Well Sign Yes Drl. Rig OK Hazard Sec. Yes BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F I 300/3,500 P 1 500/5,000 P 1 500/5, 000 P I 500/5,000 P I 500/5,000 P 2 50O/5, O0O P 1 500/5,000 P N / A N/A MUD SYSTEM: Visual Alarm Trip Tank OK OK Pit Level Indicators OK OK Flow Indicator OK OK Meth Gas Detector OK OK H2S Gas Detector OK OK FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Test Quan Pressure P/F I 500/5,000 P 500/5,000 P 500/5,000 P 500/5,000 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 500/5,000 P 42 500/5, 000 P 1 P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: 8 @ 2,400 3,000 P 1,200 P minutes 21 sec. minutes 39 sec. YES Remote: YES Psig. TEST RESULTS Number of Failures: 1 ,Test Time: 4.0 Hours. Number of valves tested 24 Repair or Replacement of Failed Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: The actuator on the Kill Line HCR Valve failed it was replaced and the valve tested good. Good test/ Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Doug Amos FI-021L (Rev. 12/94) AWQHJ LCD.XLS TONY KNOWLE$, GOVERNOR ALASK& OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 September 28, 1995 Tim Schofield, Senior Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Well Name Company Permit # Surf Loc Btmhole Loc Milne Point Unit MPF-70 BP Exploration (Alaska), Inc. 95-153 2189'NSL, 2591'WEL, Sec 06, T13N, R10E, UM 2825'NSL, 2655'WEL, Sec 30, T14N, R10E, UM Dear Mr Schofield' Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of injection wells must be demonstrated under 20 AAC 25.412 and 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test performed before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the ' ' ' ;id inspector on the North Slope pager at 659-3607. David ¥~Johnston \ Chairman'",..~.~ BY ORDER OF THE COMMISSION c: Dept of Fish & Game, Habitat Sect - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 la. Type of work Drill [] Redrill I-Illb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen []1 Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. KBE = 46 feet Milne Point / Kuparuk River 3. Address 6. Property Designation P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 355018 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) 2189' NSL, 2591' WEL, SEC 06, T13N, RIOE Milne Point Unit At top of productive interval 8. Well number Number 2549' NSL, 2640' WEL, SEC 30, T14N, R 1Od MPF-70 2S 100302630-277 At total depth 9. Approximate spud date Amount 2825' NSL, 2655' WEL, SEC 30, T14N, RIOE 10/02/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well ,14. Number of acres in property 15. Proposed depth (MD and TVD) property line ADL 355016 2455 feet No Close Approach feet 5083 14932 MD / 7576' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth ~ooo feet Maximum hole angle z5 o Maximum surface 3005 psig At total depth (TVD) 7529'/3758 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.1# NTdOLHE Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.) 12-1/4" 9-5/8" 40# L-80 Btrc 7341' 31' 31' 7372' 4496' 1419sx 'E' PF, 250 sx 'G', 250 'E' PF 8-1/2" 7" 26# L-80 Btrc .14970' 30' 30' 15005' 7575' 251 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor R ~-,., ~'" ~' Surface ii Intermediate Production 5dP 2 5 ~995 Liner Perforation depth: measured &t~ [~_ ul~ & Gas C0ns,.C_0mm_i~]~ true vertical -., ;~fil~_l~i~_l'_a~l 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis l-I Seabed report[] 20 AAC 25.050 requirementsl-I 21. I hereby c,8~ify tt/C~ t~e fore, lng/~, -~,L¢I~ 0~ is true and c(~rrec~to the best of my knowledge ,¢""~'~/~ Signed ~ ~'.~/~// Title Senior Drillin~l En~Tineer Date , -t/'"- ~,' ",,3 C(~mmission Use Only Permit Number APl number Approval date,, See cover letter ! ..~..~.-/,~'.0~,,~ , 50-4::~_..¢--.2_.,~.~'4::::~3MI ¢/;~'~/~'" for other requirements Conditions or approva~ Samples required [] Yes ,,~No ud log required []Yes ]~ No Hydrogen sulfide measures [] Yes ~ No Directional survey required ~ Yes [] No Other:Required working pressul~igll, l. for~(~eol~¢!; FI3M; 1~5M; I-IIOM', I-I15M; by order of ~,/~ Approved by David W. JohnstoF Commissioner tne commission Date Form 10-401 Rev. 12-1-85 Submit i,1 triplicate I Well Name: I MPF-70i I Well Plan Summary I Type of Well (producer or injector): [ Kuparuk Injector Surface Location: 2189' FSL 2591' FEL Sec 06 T13N R10E UM., AK. Target Location: 2549' FSL 2640 FEL Sec 30 T14N R10E UM., AK. Bottom Hole 2825' FSL 2655' FEL Sec 30 T14N R10E UM., AK. Location: Note: Target & BHL footages are based on assumed true and square sections and are not surveyed legal locations. [AFE Number: [330195 [ I Rig: I Nabors 27E I I Estimated Start Date: [ Oct 2, 1995 J IOperating days to drill and case: [MD: [ 14932' I I TYD: 17576' BKB I IKBE: I46' I Well Design (conventional, slimhole, I Ultra Slimhole, 7" Longstring etc.): I Formation Markers: Formation Tops MD TVD Formation Pressure/EMW Base permafrost 1798' 1795' n/a NA (Top Schrader) 5364' 3974' 1653 psig / 8.0 ppg OA ' 4194' 1744 psig / 8.0 ppg Base Schrader Bluff 7180' 4444' 1848 psig / 8.0 ppg Top HRZ 14069' 6855' n/a Base HRZ ' 6915' n/a Kupark D Shale 14356' 7075' n/a Kupamk C ' 7209' 3598 psig / 9.6 ppg Target KUP A3 14576' 7244' 3616 psig / 9.6 ppg Total Depth 15007' 7574' n/a Casing/Tubing Program: Hole Csg/ Wt/Ft Grade Con Length Top Btm Size Tbg n MD/TVD MD/TVD O.D. 30" 20" 91.1# NT80LHE weld 80 32/32 112/112 12 1/4" 9 5/8" 40# L-80 btrc 7341' 31/31 7372/4496 8 1/2" 7" 26# L-80 btrc 14970' 30/30 15005/7575 N/A (tbg) 2-7/8" 6.5# L-80 EUE 14447' 29/29 14476/7230 8rd Internal yield pressure of the 7" 26# casing is 7240 psi. Worst case surface pressure would occur with a full column of gas to the reservoir at 7529' TVDSS. Maximum anticipated surface pressure in this case assuming a reservoir pressure of 3758 psi is 3005 psi, well below the internal yield pressure rating of the 7" casing. Logging Program: I Open Hole Logs: Surface Intermediate Final ICased Hole Logs: LWD GR/Resistivity None LWD GR/Resistivity/Neutron/Density None A gamma ray log will be obtained from surface to TD with LWD tools. Mud Logging is not required. API# 50- September 25, 1995 Mud Program: Special design considerations LSND freshwater mud. Special attention to gravel and coal in the surface hole, with appropriate viscosity and weight to control each. The use of frequent short trips as per pad data sheet are encouraged. Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 80 15 8 10 9 8 to to to to to to to 9.6 100 35 15 30 10 15 Production Mud Properties: I Density Marsh Yield 10 sec 10 rain pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 40 15 3 7 8.5 6-10 to to to to to to to 10.2 50 20 10 20 9.5 4 - 6 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: I I m': 1 100o' Maximum Hole Angle: 75 degrees Maximum Dog Leg: _< 4 degrees Inclination in target: 40 Degrees Close Approach Well: No - See Traveling Cylinder report There are no close approach wells for drilling MPF-70. There are other well in th area but do not enter a close approach. The well path shold be followed as close as possible to ensure we do not compromise the proximity toleranxces. S EP 2 5 1995 Oil & Gas Cons, Commission Anchorage API# 50- September 25, 1995 Disposal: Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A. pit can be opened in emergencies by notifying Karen Thomas (564-4305) The Milne Point reserve with request. Fluid Handling: All drilling and completion fluids can be annular injected after allowing the cement on the 7" casing cement job to cure 6 hours following CIP. Request 1. 2. to AOGCC for Annular Pumping Approval for MPF-70: Approval is requested for Annular Pumping into the MPF-70, 9-5/8" x 7" casing annulus. Aquifers in the Milne Point Unit have been exempted from Class II injection activities by the AOGCC by Aquifer Exemption Order #2 as referenced in Area Injection Order #10. There are no domestic or industrial use water wells located within one mile of the project area. 3. The 9-5/8" casing shoe will be set at 7381' md (4496' tvd) which is below the Schrader Bluff Sands and into the Seabee formation which has a long established history of annular pumping at Milne Point. 4. The burst rating (80%) for the 9-5/8" 40# L80 casing is 4600 psig while the collapse rating (80%) of the 7" 26# L80 casing is 4325 psig. The break down pressure of the Seabee formation is 13.5 ppg equivalent mud weight. The Maximum Allowable Surface Pressure while annular pumping is calculated according to the following equation and is 2302 psi for a 10.4 ppg fluid in this well. MASP = 4325 psig - ((fluid density ppg - 1.9) X 0.052 X 9-5/8" Casing Shoe TVD 5. A determination has been made that the pumping operation will not endanger the integrity of the well being drilled by the submission of data to AOGCC on 7-24-95 which demonstrates the confining layers, porosity, and permiability of the injection zone. 6. Pumping into the hydrocarbon reservior will not occur. DO NOT EXCEED 35,000 BBLS IN ANY ANNULUS. AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED (BBL) VOL (BBL) Milne Point F-1 0 35,000 1/1/95 12/31/95 Milne Point F-13 684 35,000 1/1/95 12/31/95 Milne Point F-25 230 35,000 1/1/95 12/31/95 Milne Point F-37 0 35,000 1/1/95 - 12/31/95 Milne Point F-45 0 35,000 1/1/95 - 12/31/95 Milne Point F-53 0 35,000 1/1/95 - 12/31/95 Milne Point F-61 0 35,000 1/1/95 - 12/31/95 FREEZE PROTECTION: Pay close attention to annulii being used for disposal so to avoid freezing. Sometimes the annulii are kept open by ensuring that an adequate volume (+60 bbls) is injected every 6-12 hours. This practice is more economical than pumping 60 bbls of diesel freeze protection every time the pumps are shut down; however, if this practice is used, it is important that the injection frequency into the annulus be adequate to prevent freeze ups -- the drillers must communicate to each other the last time the annunlus was injected into to avoid freezing. API# 50- September 25, 1995 DRILLING HAZARDS AND RISKS: See both the updated Milne Point F-Pad Data Sheet and L-Pad Data Sheet prepared by Pete Van Dusen for information on the No Point#1 (F-46), and review recent wells drilled on both F and L pads. Most of the trouble time on recent wells has been due to equipment mechanical problems with the BHA, rather than formation drilling problems. The MPU PE group will be perforating, hydraulic fracturing and cleaning out wells shortly after the rig drills and completes them. This will make the near rig area congested and as a result potentially hazardous. Ensure personnel use caution moving around adjacent production activities. Lost Circulation: No Point #1 (MPF-46) did not experience any lost circulation while drilling on F- pad. The max mud weight reached on that well was 10.3 ppg. They did experience some mud losses while cementing 7" casing. Lost circulation while drilling the production interval has been a problem on 4 different L-pad wells, the closest pad to F-pad, although none of them have BHLs in the F-pad drilling area. The Kuparuk sands and a number of shallower intervals typically are highly fractured. Wells F-69, F-61, AND F-53 lost varying amounts of mud (from 70 to 220 bbls) drilling through or near the top of the Kuparuk sands, especially while running casing and cementing. Be prepared to treat these losses while drilling initially with LCM treatments. There has not been any appreciable amount of lost circulation in surface hole on any of the F Pad wellls to date. This is due to setting surface pipe deeper to cover the Schrader Bluff interval which might break down at the mud weights required to TD the well. Stuck Pipe Potential: Well MPF-53 was stuck coming out on the short trip at surface casing point. Proir to this incident there was only minor indications that the gravel and coal were present. It appears that we dragged the gravel up into the bottom of the curve and reduced our ability to move up or down. Then we lost the ability to circulate when the hole collapsed. Subsequent fishing operations were not successful and a very expensive BHA was lost in the hole from 2516 - 3342. While drilling No Point #1 the 6" BHA was stuck in 8-1/2" hole section for several hours at 6882 ss (13608' MD) before jarring free. They became stuck after tripping back to bottom following a bit trip. Lack of proper hole cleaning parameters appears to have contributed to this problem. Stuck pipe has occurred on 3 L-pad wells at the interface between the Kalubik and D-shale (called the Kuparuk cap rock). These wells and the corresponding depths at which they were stuck were: L-06 @ 6871' ss, L-07 @ 6859' ss, L-11 @ 6835' ss. Kick Tolerance: The surface casing setting depth for this well allows a kick tolerance of 97.2 bbl influx (Gas) based on a 12.5 ppg LOT at the 9-5/8" casing shoe and a estimated reservoir pressure of 3594 psig (9.6 ppg equivalent MW). Trip Schedules are required for all trips. All trips will be performed with a trip tank or one pit isolated for use as a trip tank. Formation Pressure: The maximum expected pore pressure for this well is 9.6 ppg EMW (3594 psi @ 7200' ssTVD). There has been no injection in this region since then, therefore the reservoir pressure should not exceed this estimate. WATER USAGE Have the water truck drivers track the water usage on a daily Icg. Send a copy of this Icg to Dennise Casey in the Anchorage Office on a monthly basis. API# 50- September 25, 1995 MP F-70 Proposed Summary of Operations o . o . o . 10. 11. 12. 13. 14. 15. 16. 17. Drill and Set 20" Conductor. Weld an FMC landing ring for the FMC Gen 5 Wellhead on the conductor. Prepare location for rig move. MIRU Nabors 27E drilling rig. NU and function test 20" Diverter system. Ensure the diverter is as per AOGCC specifications and is approved by AOGCC supervisor. Build Spud Mud. Drill a 12-1/4" surface hole to 7372' md (4496' tvd). (Note: This hole section will be LWD logged with GR/Res). Run and cement 9-5/8" casing. ND 20" Diverter, NU and Test 13-5/8" BOPE. Run Wear Bushing. RIH w/PDC bit and Double Power Section PDM (motor). Test the 9-5/8" casing to 3000 psig and plot pressure vs volume for LOT baseline. Drill out float equipment and 10 feet of new formation, Perform a LOT to a maximum of 12.5 ppg as per Recommended Practices Manual. Record pressure vs. cumulatrive volume for LOT test for well file. Drill 8-1/2" hole to TD at 15005' MD (7576' TVD). (Note: This hole section will be logged LWD with Triple Combo (GR/Res/Neu/Dens). Pull Wear Bushing, and Change Pipe Rams to 7". Run and Cement 7" casing. Test casing to 3500 psi and freeze protect wellbore to 2000' TVD with diesel. ND BOPE and NU dry hole tree. Release rig to MPF-62. Note: This well will be perforated, hydraulically fractured and cleaned out with a completion rig and prior to running the injection completion. Following the stimulation the well will be left with a retrievable bridge plug (RBP) set 500' above the perforations and kill weight brine in the wellbore. MIRU workover completion unit. ND dry hole tree. NU BOPs and test. PU and R/H with 2-7/8" EUE 8rd tubing with RBP retrieving tool. Release RBP and POH standing back tubing. RIH with Electric Submersible Pump (ESP) completion on 2-7/8" EUE 8rd tubing. Set 2 way check. ND BOPE and NU tree and test. Pull two way check, freeze protect, set BPV, close valves. Test tree. RDMO with workover/completion rig. POST RIG WORK , Complete the handover form and turn it and the well files over to production. Turn over the well files along with the handover form. . A SBT/GR/CCL is not required on this well and will only be run if there are problems on the production cement job. . An adequate volume to cover 2000' of diesel needs to be injected down the 7" X 9-5/8" annulus before moving the rig off the well. Please note type and volume of freeze protection pumped down the outer annulus on the morning report. , The rig will not complete this well. PEs will perforate, frac and clean out this well with a completion rig. AP1 # 50- September 25, 1995 MPF-70 WELL 9-5/8" SURFACE CASING CEMENT PROGRAM- HALLIBURTON CASING SIZE: 9-5/8" CIRC. TEMP 80 deg F at 4000' TVDSS. SPACER: 75 bbls fresh water. LEAD CEMENT TYPE: Type E Permafrost ADDITIVES: Retarder WEIGHT: 12.0 ppg YIELD: 2.17 ft3/sx MIX WATER: 11.63 gal/sk APPROX #SACKS: 1419 THICKENING TIME: Greater than 4 hrs at 50° F. TAIL CEMENT TYPE: Premium G ADDITIVES: 0.2% CFR-3, 0.2% Halad-344, 2.0% CaC12 WEIGHT: 15.8 ppg APPROX #SACKS: 250 FLUID LOSS: 100-150 cc YIELD:i.15 ft3/sx MIX WATER: 5.0 gal/sk THICKENING TIME: Greater than 4 hrs at 50° F. FREE WATER: 0 TOP JOB CEMENT TYPE: Type E Permafrost ADDITIVES: Retarder WEIGHT: 12.0 ppg YIELD: 2.17 cu ft/sk. MIX WATER: 11.63 gal/sk APPROX NO SACKS: 250 CENTRALIZER PLACEMENT: 1. 1 Bowspring centralizer per joint of 9-5/8" casing on the bottom 10 joints above the FS. 2. Place all centralizers in middle of joints using stop collars. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Do not overdisplace by more than 1/2 the shoe joint. Mix slurry on the fly -- batch mixing is not necessary. CEMENT VOLUME: 1. The Tail Slurry volume is a standard 250 sacks is calculated to cover the 9-5/8" Casing Shoe with 30% excess. 2. The Lead Slurry volume is calculated to cover from the top of the Tail Slurry to 1500' md with 30% excess and from 1500' md to surface with 100% excess. 4. 80'md 9-5/8", 40# capacity for float joints. 5. Top Job Cement Volume is 250 sacks. API# 50- September 25, 1995 MPF-70 7" PRODUCTION CASING CEMENT PROGRAM- HALLIBURTON THIS WILL BE A SINGLE STAGE CEMENT JOB ACROSS THE KUPARUK INTERVAL ONLY: CIRC. TEMP: 140° F BHST 170 deg F at 7260' TVDSS. SPACER: 20 bbls fresh water. 70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current mud weight. CEMENT TYPE: Premium G ADDITIVES: 0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344 WEIGHT: 15.8ppg YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk APPROX 4/SACKS: 251 THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F FLUID LOSS: < 50cc/30 rain @ 140° F FREE WATER: 0cc @ 45 degree angle. CENTRALIZER PLACEMENT: 1. 7-1/8 .... x 8-1/4" Straight Blade Turbulators -- two per joint on the bottom 17 joints of 7" Casing (34 total). Use stop collars to fasten centralizers to casing joints. This will cover 300' above the top of the Kuparuk sands. 2. Run one 7-1/8" x 8-1/4" Straight Blade Turbulator a minimum of 60 feet inside the 9- 5/8"casing shoe to avoid hanging up on the shoe. This centralizer may be attached across a casing collar connection. 3. Total 7-1/8 .... x 8-1/4" Straight Blade Turbulators needed is 35. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-10 bpm until the plug bumps, but not more than to displace cement just above the production zone. Batch mixing is not necessary. CEMENT VOLUME: 1. The cement volume is calculated to cover 1000' md above the top of the Kuparuk Sands with 30% excess over a guage hole. SEP 2 5 1995 & Gas Cons. Commission Anchorage API# 50- September 25, 1995 BPX-Sha ed A( sk State Mi[ne : MPF MPF-?O MPF-70 /p4 Sepvlces D illln9 Plane: Zone4 VERTICAL VIE~ SCALE 50(] f't, / DD/ISION TVD RE-F: ~E:LLFEAD VERTICAL SECTION REF: WELLHEAD CRITICAL P[]D~T DATA TIF IN MD Inc AN. ~ N/S E/W ST~T 0.00 335,00 I ON [}- BJkD 8 1.00/100 ?t START 0:- 1300 3.00 335,00 i3~0 ? N 3 W 1.50/100 ?t [F CLRVE 1705 g,O0 34~00 l~ 47N 16W EB.l~Per'Ma'Fr(~'t 1;;~J~g,O0 34 '.00 6! N EKD ~ START ~ lg(Z5 g,CK) :~45,00 78N 84 8.50/100 START ElL.. 314B 40,CX),35~,003017 ~ N '~07 8.50/100 END ~ CL.RVE ~ 7'3.00~,(X] 37,44 1~73 N lg! ~.00/100 rt ~o ~o~ ~.~ o.ol4~ ~1o 31o mzB ~.~ o,o~~ ~11o~31o 9347 N 815 W 0.(30 B 0 MD TIE ~~ START OF 185tl ;'3,00 I,L:~) a.~/loo r~ 10919 O~ 8 1~ MD ~ / ST~T ~ ~ILD 8 1~/1~ ~ I 3~8 1~ MD~ ST~T ~ ~E 8 1.~/1; ~t C~I~INT ~TAAz, TVD ~ E/W 7 In 14938 40,~ 8.~ ~6 lll~ ~ ~8 W 1 ~ ~ 8 ~ ~ Tartar glTl~ 7845 1~19 N 91 W ~1817 / ~'~,~ ~ ~8 ~ _ ~ ~ Date ~otte~ g/25/~ ~ ~,St e ~ ~ ~ ~ Created By ~-~7~ e ~~ ~ . ~ Checke~ By ~ 73~ ~ _~, ~ ~ Appr~ed By 1~4 ~_ 73.~ ~ ~ ' Date Tc~t g17195 14499 40,00 8.00 ~ / T~qJ~3 ~. -5OO 0 50O 1000 1500 80O0 VERTICAL SECTION PLANE; 359,73 PROFI]SED BHL TVD 757631 MS ! 1195,17 ~ji~3 ~ N/S 11195,04 N g348 -~'""~ 65.08 e iE:~il MD -~,.,.59.14 8 13~11 ~ ",k 537P ~ 13511 MD '~.x4g. P7 ~ 13711 MD '%,. 43.86 ~ 13986 ND TFRZ tllg5 3000 35(/] 4(X]O 4500 5000 5500 6000 65C0 7000 7500 8000 8500 9002 950(] 10000 !0500 11000 1150] t L~3DO 1800( 115(/ 15(/  ] HALLIBURTDN g/25/95 8D8 o~. F[]RIZDNTAL VIE-¥ ~ N[IRTh~ SCALE 500 ri:. / DIVISI[]N SURVEY REF: ~ELLFEAD J-- ,_ )__ 6483 - 4.83 63~5 - 3.14 fx~34 - 2,4Q )-- .~5~ 1.1~7 1.L~ I-- I-- i-- __ __ __ __ l ~',~ 5/e m ~, e z~)z9 ~, 4~ TV9 ~445 - ~.~ __ __ __ _ BPX-Shap ed Sep vlces'XqmiLLin 9 ALaska S~ate PLane', IvliLne P~ ' MPF ~PF-70 IvlPF-70 Wp4 t-I]RIZENT/N_ VIEW (TRUE~RTH) SC&E ~oa r~, / ~ivisrm SLRVEY REF, WELLHEAD ~: HALLIBURT[]N 9/L::~/q~ ~Og ~ WELLS STATUS 91';25195 ]BPX-Sh~r ed Set vices ~-nriLting A[(lsko St~e P[ene: Zone4 MiLne P~ ' MPF MPF-?0 MPF-?0 Wp4 HALLIBURTO~ g~ ~10 HiiRIZO',ITAL VIEW (TRUE NORTH) SCPI_E 500 Ft, / DIVISION SURVEY REP WELLI-EAD WEllS STATUS Mc'F-37 ~,r~ r, y FL[]WING I,,PF'-78 FLIDWIhr,-J ~F--77 ~ FL~ I¥PF-69 ~ FLDWIhl3 Nf:F-6 ! G-]]--R No Paln't No, l FL[]W]]~ PPF-45 Mwd FL[]~/NG P~F -13 G-I]-R F~ M~--01 G-IkR FL[]~XG I~F-L;~ ~x~o-b~ FLOWI1NIS : 9/~5/95 I : : Halliburton Energy Services - Drilling Systems PSL Proposal Report Page I . Date: 9/25/95 Tune: 2:10 am Wellpath ID: MPF-70 Wp4 Last Revision: 9/25195 Survey Refeaeace: Wg.l.l HEAD Reference World Cootdina~: I. aL 70.30.30 N - Long. 149.39.24 W Re/~ GRID System: Alaska State Plane Zone: Alaska 4 Refexence GRID Coo~_in~: (ft): 6035642.26 N 541969.63 E N~th Aligned To: TRUE NORTH Vertical Section Reference: WELLHEAD TVD Refea'ence: Wg-! .I .HEAD Calculated using the Minimum Curvature Method Computed using WIN-CADDS REV2. I.B Vertical Section Plane: 359.73 deg. BPX-Shared Setwices Drilling Alaska State Mane: Zone4 Milne Pt: MPF MPF-70 MPF-70 Wp4 Measured Incl Drift Subsea TVD Course T O T A L Depth Dir. Depth Length Rectangular Offsets (ft) (deg.) (deg.) (ft) (ft) (ft) (ft) (ft) GRID Coordinates Northing Easting (ft) (ft) Closure Vertical Build Walk DLS Cum. Expected Total Max Hor Mm Hor Dir. Vext Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Erro~ (ft) (deg.) (ft) (dg/100ft) (dg/100ft) (dg/10Oft) (deg) (ft) (fl) (ft) (ft) (deg.) (ft) S~vey Tool TIE IN 0.00 0.00 ' 0.00 -44.70 0.00 0.00 0.00N KOP I START OF BUILD @ 1.00 deg/100 ft 1000.00 0.00 0.00 955.30 1000.00 1000.00 0.00N 1100.00 1.00 335.00 1055.29 1099.99 100.00 0.79N 1200.00 2.00 335.00 1155.26 1199.96 100.00 3.16N START OFCURVE @ 1.50 deg/100 ft 1300.00 3.00 335.00 1255.16 1299.86 100.00 7.12N 1400.00 4.47 339.96 1354.95 1399.65 100.00 13.15N 0.00E 6035642.26 541969.63 0.00 E 6035642.26 541969.63 0.37W 6035643.05 541969.26 1.4~hr 6035645.42 541968.14 3.3ZN 6035649.36 541966.28 0.00@ 0.00 0.00 0.00@ 0.00 0.00 0.87@ 335.00 0.79 3.49@ 335.00 3.17 7.85@ 335.00 7.13 5.7ON 6035655.37 541963.80 14.35@ 336.34 13.17 8.6C'W 6035663.96 541960.86 23.41@338.29 21.79 1500.00 5.95 342.46 1454.53 1499.23 100.00 21.75N 1600.00 7.44 343.96 1553.85 1598.55 100.00 32.91N 12.01W 6035675.10 541957.44 35.03@339.96 32.97 1700.00 8.93 344.96 1652.83 1697.53 100.00 46.63N 15.81W 6035688.80 541953.56 49.24@341.27 46.70 0.00 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 1.47 4.96 1.48 2.50 1.49 1.50 1.49 1.00 0.00 0.0 0.00N 0.00 E 0.00 0.00 0.00 0.00 BPHG-PBD 0.00 0.0 0.OON 0.00 E 4.62 4.62 0.00 2.39 BPHG~PBD 1.00 1.0 0.79N 0.37W 5.02 5.02 65.00 2.64 BPHG-PBD 1.00 2.0 3.16 N 1.4~'W 5.42 5.42 65.00 2.89 B PHG-PBD 1.00 3.0 7.12N 3.32W 5.83 5.82 65.00 3.15 B PHG-PBD 1.50 4.5 13.15 N 5.7ON 6.25 6.23 69.23 3.42 B PHG-PBD 1.50 6.0 21.75N 8.6cow 6.67 6.63 71.46 3.69 BPHG-PBD 1.50 7.5 32.91 N 12.01W 7.10 7.02 72.84 3.98 BPHG-PBD 1.50 9.0 46.63 N 15.81W 7.55 7.41 73.80 4.28 B PHG-PBD END OF CURVE 1704.52 9.00 345.00 1657.29 1701.99 4.52 47.31N 15.9~W 6035689.48 541953.38 49.94@ 341.32 47.38 B. Pemmfrost 1798.38 9.00 345.00 1750.00 1794.70 93.86 61.49N 19.7gW 6035703.64 541949.50 64.60@342.16 61.59 START OF CURVE @ 2.50 deg/100 ft 1904.52 9.00 345.00 1854.83 1899.53 106.14 77.53N 24.0~W 6035719.65 541945.11 81.19@342.74 77.64 2004.52 11.48 346.91 1953.23 1997.93 100.00 94.78N 28.37W 6035736.87 541940.73 98.93@ 343.34 94.91 2104.52 13.96 348.14 2050.77 2095.47 100.00 116.28N 33.1CW 6035758.34 541935.88 120.90@344.11 116.43 2204.52 16.45 349.01 2147.26 2191.96 100.00 141.99N 38.2~/ 6035784.02 541930.55 147.06@344.91 142.17 2304.52 18.94 349.66 2242.52 2287.22 100.00 171.87N 43.9CW 6035813.86 541924.77 177.38@345.67 172.07 2404.52 21.44 350.15 2336.36 2381.06 I00.00 205.85N 49.94W 6035847.80 541918.54 211.82@346.36 206.08 2504.52 23.93 350.56 2428.62 2473.32 100.00 243.87N 56.3gW 6035885.78 541911.87 250.30@346.98 244.13 1.49 0.00 0.00 2.48 2.49 2.49 2.49 2.49 2.50 0.83 0.00 0.00 1.91 1.24 0.87 0.65 0.50 0.40 1.50 9.1 47.31N 15.9<b'W 7.57 7.43 73.84 4.29 B PHG-PBD 0.00 9.1 61.49N 19.79~vV 7.99 7.82 73.86 4.53 BPHG-PBD 0.00 9.1 77.53 N 24.0gW 8.47 8.27 73.92 4.81 B PHG-PBD 2.50 11.6 94.78N 28.37W 8.94 8.62 75.36 5.17 BPHG-PBD 2.50 14.1 116.28N 33.1CW 9.43 8.96 76.47 5.56 BPHG-PBD 2.50 16.6 141.99N 38.2fiw 9.95 9.28 77.33 5.99 B PHG-PBD 2.50 19.1 171.87N 43.9C~/ 10.50 9.56 78.01 6.45 BPHG-PBD 2.50 21.6 205.85N 49.94W 11.09 9.83 78.56 6.94 BPHG-PBD 2.50 24.1 243.87 N 56.3g~vV 11.72 10.06 79.02 7.46 BPHG-PBD Halliburton Energy Services - Drilling Systems PSL Proposal Report Page 2 Date: 9/25/95 ' Wellpath ID: MPF-70 Wp4 Measured Incl Drift Subsea TVD Course T O T A L Depth Dir. Depth 12aglh Rectangular Offsets (fl) (deg.) (deg.) fit) (ft) (fi) (ft) (ft) GRID Coordinates Northing Easting (ft) (fi) Closure Vertical Build Walk DIS Cum. Expected Total Max Hor MAn Hor Dir. Vert Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error (ft) (deg.) (ft) (dg/lOOft) (dg/lOOft) (dg/lOOft) (deg) (fi) (ft) (ft) (ft) (deg.) (ft) Survey Tool 2604.52 26.43 350.88 2519.11 2563.81 100.00 285.86N 63.2~%V 6035927.73 541904.78 292.77@347.52 286.15 2.50 0.33 2704.52 28.93 351.16 2607.66 2652.36 100.00 331.74N 70.4gW 6035973.56 541897.28 339.14@348.00 332.06 2.50 0.28 2804.52 31.42 351.39 2694.10 2738.80 100.00 381.42N 78.11W 6036023.19 541889.38 389.33@348.43 381.78 2.50 0.24 2904.52 33.92 351.60 2778.27 2822.97 100.00 434.80N 86.0gW 6036076.53 541881.10 443.24@348.80 435.20 2.50 0.20 3004.52 36.42 351.78 2860.01 2904.71 1{30.00 491.79N 94.42AV 6036133.47 541872.45 500.78@349.13 492.23 2.50 0.18 3104.52 38.92 351.94 2939.16 2983.86 100.00 552.28N 103.0')W 6036193.90 541863.46 561.82@349.43 552.76 2.50 0.16 START OF CURVE @ 2.50 deg/100 fl 3147.85 40.00 352.00 2972.61 3017.31 43.33 579.55N 106.92NV 6036221.14 541859.46 589.33@349.55 580.04 2.50 0.15 3247.85 42.46 352.67 3047.82 3092.52 100.00 644.87N l15.6gW 6036286.40 541850.31 655.16@349.83 645.40 2.46 0.67 3347.85 44.92 353.29 3120.12 3164.82 100.00 713.42N 124.1~aW 6036354.90 541841.49 724.14@350.13 713.99 2.46 0.61 3447.85 47.39 353.85 3189.38 3234.08 I00.00 785.09N 132.2CW 6036426.51 541833.02 796.14@350.44 785.70 2.47 0.56 3547.85 49.86 354.37 3255.47 3300.17 100.00 859.73N 139.9(.W 6036501.10 541824.90 871.03@350.76 860.37 2.47 0.52 3647.85 52.33 354.85 3318.27 3362.97 100.00 937.20N 147.21W 6036578.52 541817.16 948.69@351.07 937.87 2.47 0.48 3747.85 54.81 355.30 3377.65 3422.35 100.00 1017.35N 154.11W 6036658.63 541809.81 1028.96@35.1.39 1018.06 2.47 0.45 3847.85 57.28 355.73 3433.50 3478.20 100.00 1100.04N 160.5gW 6036741.27 541802.86 1111.70@ 351.69 1100.77 2.48 0.42 3947.85 59.76 356.13 3485.72 3530.42 100.00 1185.10N 166.64W 6036826.28 541796.33 1196.75@352.00 1185.86 2.48 0.40 2.50 26.6 285.86N 63.25W 12.40 10.26 79.40 8.02 BPHG-PBD 2.50 29.1 331.74N 70.4gW 13.13 10.43 79.72 8.60 BPHG-PBD 2.50 31.6 381.42N 78.11W 13.93 10.57 80.01 9.20 BPHG-PBD ._o 2.50 34.1 434.80N 86.0gW 14.79 10.67 80.25 9.83 BPHG-PBD..~ 2.50 36.6 491.79N 94.42W 15.73 10.74 80.47 10.48 B PHG-PB"D~" ~'! 2.50 39.1 552.28N 103.079/ 16.75 10.77 80.67 11.15 BPHG-PBD~.[ 2.50 40.2 579.55 N 106.92W 17.22 10.78 80.75 11.45 BPHG-P 2.50 42.7 644.87 N 115.6gW 18.37 10.76 81.17 12.13 BPHG-PBD 2.50 45.2 713.42N 124.17W 19.62 10.71 81.56 12.84 BPHG~PBD _~]~ 2.50 47.7 785.09 N 132.2CW 20.98 10.63 81.94 13.55 BPHG-P~ 2.50 50.2 859.73 N ! 39.9~W 22.46 10.51 82.30 14.27 BPHG-PBD 2.50 52.7 937.20N 147.21W 24.08 10.35 82.64 14.99 BPHG~PBD 2.50 55.2 1017.35N 154.11W 25.85 10.16 82.98 15.72 BPHG-PBD 2.50 57.7 1100.04N 160.5gW 27.79 9.93 83.29 16.45 BPHG-PBD 2.50 60.2 1185.10N 166.64W 29.93 9.68 83.61 17.18 BPHG-PBD 4047.85 62.23 356.51 3534.20 3578.90 100.00 1272.37N 172.2~Wq 6036913.51 541790.23 1283.97@352.29 1273.16 2.48 0.38 4147.85 64.71 356.87 3578.86 3623.56 100.00 1361.68N 177.41W 6037002.79 541784.56 1373.19@352.58 1362.50 2.48 0.37 4247.85 67.19 357.23 3619.60 3664.30 100.00 1452.88N 182.11W 6037093.95 541779.36 1464.25@352.86 1453.71 2.48 0.35 4347.85 69.67 357.56 3656.36 3701.06 100.00 1545.77N 186.3~wq 6037186.81 541774.61 1556.96@353.13 1546.63 2.48 0.34 4447.85 72.15 357.89 3689.06 3733.76 100.00 1640.19N 190.019N 6037281.20 541770.33 1651.17@353.39 1641.06 2.48 0.33 END OF CURVE 4481.95 73.00 358.00 3699.27 3743.97 34.10 1672.71N 191.2~wq 6037313.70 541768.98 1683.61@353.48 1673.59 2.48 0.32 2.50 62.7 1272.37N 172.2LAV 32.29 9.40 83.91 17.90 BPHG-PBD 2.50 65.2 1361.68N 177.41W 34.92 9.10 84.21 18.61 BPHG-PBD 2.50 67.7 1452.88N 182.11W 37.87 8.78 84.51 19.31 BPHG-PBD 2.50 70.2 1545.77N 186.3.aW 41.21 8.46 84.80 20.00 BPHG-PBD 2.50 72.7 1640.19N 190.0~'W 45.05 8.13 85.11 20.67 BPHG-PBD 2.50 73.5 1672.71N 191.25W 46.44 8.02 85.21 20.90 BPHG-'PBD NA Sands 5271.12 73.00 358.00 3930.00 3974.70 789.17 2426.94N 217.5~V 6038067.70 541738.40 2436.67@ 354.88 2427.93 0.00 0.00 6878.67 73.00 358.00 4400.00 44.~..70 1607.54 3963.30N 271.24W 6039603.58 541676.11 3972.57@356.08 3964.53 0.00 0.00 CASING POINT OD = 9 5/8 in, ID = 8.84 in, Weight = 40.00 lb/fL 7078.66 73.00 358.00 4458.47 4503.17 199.99 4154.44N 277.91W 6039794.66 541668.36 4163.73@356.17 4155.69 0.00 0.00 0.00 73.5 2426.94N 217.51~V 79.58 9.99 86.31 24.41 BPHG-PBD 0.00 73.5 3963.30N 271.24W 148.98 14.26 87.09 31.80 BPHG-PBD 0.00 73.5 4154.44N 277.91W 0.00 0.00 0.00 0.00 BPHG-PBD START OF CURVE @ 2.00 deg/100 ft 7981.95 73.00 358.00 4722.57 4767.27 903.29 5017.74N 308.0e'W 6040657.69 541633.37 5027.19@ 356.49 5019.12 0.00 0.00 End Gym 8078.00 72.99 0.01 4750.66 4795.36 96.05 5109.57N 309.6~¢W 6040749.50 541631.26 5118.94@356.53 5110.96 -0.01 2.09 0.00 73.5 5017.74N 308.0(W 196.95 17.26 87.31 36.97 BPHG-PBD 2.00 75.4 5109.57N 309.6Y~V 201.12 17.59 87.42 37.43 BPHG-PBD 8078.25 72.99 0.01 4750.73 4795.43 0.25 5109.81N 309.6~%V 6040749.74 541631.25 5119.18@356.53 5111.20 0.16 2.08 8081.95 72.99 0.09 4751.82 4796.52 3.70 5113.35N 309.6~%V 6040753.28 541631.24 5122.71@356.53 5114.74 -0.01 2.09 END OF CURVE 8139.28 73.00 1.29 4768.58 4813.28 57.32 5168.16N 308.9gW 6040808.09 541631.59 5177.39@356.58 5169.55 0.01 2.09 START OF CURVE @ 2.00 deg/100 ft 12510.62 73.00 1.29 6046.64 6091.34 4371.34 9347.43N 214.8ON 6044987.42 541702.13 9349.90@358.68 9348.33 0.00 ~0.00 12610.62 71.02 1.58 6077.52 6122.22 100.00 9442.51N 212.4~N 6045082.50 541703.97 9444.90@358.71 9443.40 -!.98 0.29 2.00 75.4 5109.81N 309.6~%V 201.12 17.59 87.42 37.43 BPIHRMWD-PBD 2.00 75.5 5113.35N 309.6.%V 201.15 17.60 87.42 37.45 BPIHRMWD-PBD 2.00 76.7 5168.16N 308.9gW 201.56 17.81 87.46 37.76 BPIHRMWD-PBD 0.00 76.7 9347.43 N 214.8e'W 274.24 30.88 88.85 71.54 BPIHRM3,VD-PB D 2.00 78.7 9442.51N 212.4~V 276.56 31.94 88.89 72.10 BPIHRMWD-PBD Halliburton Energy Services - Drilling Systems PSL Proposal Report Page 3 Date: 9/25/95 Wellpath ID: MPF-70 Wp4 Measured lnel Drift Subsea TVD Course T O T A L Depm Dir. Depth ~ ~ectang~ar Offsets (ft) (deg.) (deg.) (ft) (ft) (n) (f0 (ft) GRID Coordinates Northing Easting (ft) (fl) Cloaure Vextieal Build Walk DLS Cum. Expected Total Max Hoc Min Hot Dir. Vert Dist. Dir. Section Rate Rate Dogleg Rectangular Coords Error Error Max Err Error (ft) (deg.) (ft) (dg/100ft) (dg/100ft) (dg/100ft) (deg) (ft) (ft) (ft) (ft) (deg.) (ft) Survey Toot 12710.62 69.04 1.87 6111.68 6156.38 100.00 9536.45N 209.65W 6045176.44 541706.27 9538.75@358.74 9537.32 -1.98 12810.62 67.06 2.18 6149.06 6193.76 100.00 9629.13N 206.37W 6045269.14 541709.02 9631.34@358.77 9629.99 -1.98 12910.62 65.08 2.49 6189.62 6234.32 100.00 9720.46N 202.6~qV 6045360.47 541712.22 9722.57@358.81 9721.30 -1.98 0.30 0.30 0.31 2.00 80.7 9536.44N 209.4TN 278.87 33.07 88.93 72.63 BPHM-PBD 2,00 82.7 9629.12N 206.0Oht 281.16 34.26 88.98 73.10 BPHM-PBD 2.00 84.7 9720.43N 202.07W 283.44 35.49 89.02 73.54 BPHM-PBD 13010.62 63.10 2.81 6233.31 6278.01 100.00 9810.30N 198.5CW 6045450.33 541715.86 9812.31@358.84 9811.12 -1.98 13110.62 61.12 3.14 6280.09 6324.79 100.00 9898.56N 193.91W 6045538.61 541719.95 9900.46@358.88 9899.36 -1.98 13210.62 59.14 3.49 6329.89 6374.59 100.130 9985.13N 188.8~'W 6045625.19 541724.48 9986.92@358.92 9985.91 -1.98 0.32 0.33 0.35 2.00 86.7 9810.27N 197.6t~ht 285.70 36.77 89.07 73.92 BPHM-PBD 2.00 88.7 9898.52N 192.87W 287.93 38.08 89.11 74.26 BPI-t3d-PBD 2.00 90.7 9985.07N 187.54W 290.13 39.42 89.16 74.56 BPFIM-PBD 13310.62 57.17 3.85 6382.64 6427.34 100.00 10069.90N 183.4ON 6045709.98 541729.43 10071.57@358.96 10070.65 -1.98 13410.62 55.19 4.23 6438.30 6483.00 100.00 10152.77N 177.6CW 6045792.87 541734.81 10154.33@359.00 10153.49 -1.98 13510.62 53.22 4.63 6496.78 6541.48 108.00 10233.64N 171.34W 6045873.77 541740.61 10235.07@359.04 10234.33 -i.97 13610.62 51.25 5.04 6558.03 6602.73 100.00 10312.40N 164.6b~/ 6045952.56 541746.82 10313.72@359.09 10313.06 -1.97 13710.62 49.27 5.48 6621.95 6666.65 100.00 10388.97N 157.6~V 6046029.16 541753.43 10390.17@359.13 10389.59 -1.97 13810.62 47.31 5.95 6688.49 6733.19 100.00 10463.25N 150.2EW 6046103.47 541760.44 10464.33@359.18 10463.83 -1.97 0.36 0.38 0.40 0.42 0.44 0.47 2.00 92.7 10069.82N 181.81W 292.30 40.79 89.21 74.81 BPHM-PBD 2.00 94.7 10152.66N 175.6_%V 294.44 42.17 89.26 75.01 BPHM-PBD 2.00 96.7 10233.51N 169.0~N 296.53 43.56 89.31 75.17 BPHIM-PBD 2.00 98.7 10312.24N 162.1CW 298.58 44.96 89.36 75.29 BPHM-PBD 2.00 100.7 10388.78N 154.71W 300.58 46.35 89.41 75.36 BPHM-PBD 2.00 102.7 10463.02N 146.94W 302.54 47.74 89.46 75.39 BPHM-PBD 13910.62 45.34 6.45 6757.54 6802.24 100.00 10535.14N 142.3~'W 6046175.40 541767.84 10536.11@359.23 10535.69 -1.97 13985.70 43.86 6.85 6811.00 6855.70 75.08 10587.50N 136.2~ 6046227.79 541773.64 10588.38@359.26 10588.03, -1.97 14010.62 43.37 6.98 6829.04 6873.74 24.92 10604.57N 134.22AV 6046244.87 541775.61 10605.42@359.27 10605.08 -1.96 0.50 0,53 0.55 2.00 104.7 10534.88N 138.78W 304.43 49.12 89.52 75.38 BPHM-PBD 2.00 106.2 10587.21N 132.4TN 305.83 50.15 89.56 75.35 BPHM-PBD 2.00 106.7 10604.26N 130.20/ 306.29 50.49 89.57 75.34 BPI-IM-PBD 14110.62 41.41 7.56 6902.89 6947.59 100.00 10671.45N 125.69N 6046311.78 541783.75 10672.19@359.33 10671,92 -1.96 END OF CURVE 14182,63 40.00 8.00 6957.48 7002.18 72.02 10717.98N 119.34W 6046358.35 541789.84 10718.64@359.36 10718.42 -1.96 14278.60 40.00 8,00 7031.00 7075.70 95.97 10779.07N ll0.7~qN 6046419.47 541798.07 10779.64@359.41 10779.47 0.00 0.57 0.61 0.00 2.00 108.7 10671.09N 121.3~V 308.07 51.84 89.62 75.26 BPHM-PBD 2.00 110.1 10717.59N 114.78W 309.31 52.80 89.66 75.18 BPHM-PBD 0.00 110.1 10778.63N 105.87W 310.99 53.26 89.72 75.64 BPHM-PBD Target 9/7/951 TKUA3 14499.22 40.00 8.00 7200.00 7244.70 220.62 10919.50N 91.0;2W 6046560.00 541817.00 10919.87@359,52 10919.80 0.00 14632.10 40.00 8.00 7301.80 7346.50 132.89 11004.08N 79.1~aW 6046644.64 541828.40 11004.37@359.59 11004.33 0.00 CASING POINT OD = 7 in, ID = 6.28 in, Weight = 26.00 lb/ft. 14932.10 40.00 8.00 7531.61 7576.31 300.00 11195.04N 52.2gW 6046835.73 541854.14 11195.17@359,73 11195.17 0.00 0.00 0.00 0.00 110.1 10918.95N 85.3ON 314.86 54.32 89.84 76.69 BPHM-PBD 0.00 110.1 11003.47N 73.01W 317.20 54.97 89.91 77.32 BPHM-PBD 0.00 110.1 11194.29N 45.1.cNV 322.54 56.43 270.06 78.75 BPHM-PBD 'WELL PERMIT CHECKLIST UNIT# PROGRAM: exp [] dev [] redrll [] serv~ ADMINISTRATION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Permit fee attached .................. Lease number appropriate ............... Unique well name and number .............. Well located in a defined pool ............. Well located proper distance from drlg unit boundary.. Well located proper distance from other wells ..... Sufficient acreage available in drilling unit ..... If deviated, is wellbore plat included ........ Operator only affected party .............. Operator has appropriate bond in force ......... Permit can be issued without conservation order .... Permit can be issued without administrative approval.. Can permit be approved before 15-day wait ....... ENGINEERING 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~X~ N 16. CMT vol adequate to circulate on conductor & surf cs9. .~ N 17. CMT vol adequate to tie-in long string to surf csg . . . Y ~ 18. CMT will cover all known productive horizons ...... Y~ N 19. Casing designs adequate for C, T, B & permafrost .... .~ N 20. Adequate tankage or reserve pit ............ N 21. If a re-drill, has a 10-403 for abndnmnt been approved. ~ 22. Adequate wellbore separation proposed ......... .~ N 23. If diverter required, is it adequate .......... '~ N 24. Drilling fluid program schematic & equip list adequate N 25. BOPEs adequate .............. .~, N 26. BOPE press rating adequate; test to ~~ ~s~g-t3.~ N 27. Choke manifold complies w/API RP-53 (May 84) ...... ~ 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of H2S gas probable ............ ~ N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y N//_ 31. Seismic analysis of shallow gas zones ......... Data presented on potential overpressure zones ..... Y/,~ 32. 33. Seabed condition survey (if off-shore) ....... 34. Contact name/phone for weekly progress reports . . //. . Y N [exploratory only] REMARKS GEOLOGY: ENGINEERING: COMMISSION: w · TAB Comments/Instructions: HOW/jo - A:\FORMS~cheklist rev 03194 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: Li~ TAPE HEADER MILNE POINT UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MPF-70 500292260300 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 07-MAY-96 MWD RUN 1 6618.00 M. HANIK J. GAFFANEY MWD RUN 2 M. HANIK J. GAFFANEY MWD RUN 3 B. ZIEMKE J. GAFFANEY 6 13N 10E 2189 2591 46.00 12.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 20.000 112.0 3RD STRING 12.250 9.625 7085.0 PRODUCTION STRING 8.500 14989.0 REMARKS: MWD- DGR/EWR4/CNP/SLD. ALL DEPTHS ARE MEASURED BIT DEPTHS. ALL GAMMA RAY DATA WAS ACQUIRED WITH DUAL GAMMA RAY, GEIGER MUELLER TUBE DETECTORS (DGR/SGRC) . MWD RUNS 1 & 2 WERE DIRECTIONAL WITH GAMMA RAY (DGR) & ELECTROMAGNETIC 4-PHASE WAVE RESISTIVIY (EWR4) . MWD RUN 3 WAS DIRECTIONAL WITH GAMMA RAY (DGR), ELECTROMAGNETIC 4 PHASE WAVE RESISTIVITY, COMPENSATED NEUTRON POROSITY (CNP), & STABILIZED LITHO DENSITY (SLD) . ENVIRONMENTAL PARAMETERS FOR NUCLEAR LOG PROCESSING: HOLE SIZE = 8.5" MUD WEIGHT = 8.4 - 10.2 ppg MUD FILTRATE SAL. = 700 - 900 ppm FORMATION WATER SAL. = 14545 ppm FLUID DENSITY = 1.0 g/cc MATRIX DENSITY = 2.65 g/cc LITHOLOGY = SANDSTONE FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP NPHI RHOB $ BASELINE CURVE FOR SHIFTS: GRCH CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH 85.0 77.0 7108.0 7108.0 BASELINE DEPTH GR 77.5 54.5 13484.0 13461.0 13623.5 13596.0 13658.0 13626.5 13764.5 13737.0 14072.0 14044.0 14185.0 14157.0 14279.0 14251.5 14321.5 14293.0 14543.5 14518.0 14604.5 14577.0 14634.5 14609.5 14682.0 14658.5 14830.5 14809.5 15010.0 14989.0 $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD $ REMARKS: all bit runs merged. STOP DEPTH 14949.0 14922.0 14929.0 14938.0 (WALS , 29-FEB-96) EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 110.0 3916.0 2 3916.0 7112.0 3 7112.0 14989.0 MERGED MAIN PASS. ALL MWD CURVES WERE SHIFTED WITH GR. SHIFT. OUT CN : BP EXPLORATION WN : MPF-70 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F, 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 NPHI MWD 68 1 PU-S 4 7 RHOB MWD 68 1 G/C3 4 8 DRHO MWD 68 1 G/C3 4 9 PEF MWD 68 1 BN/E 4 10 ROP MWD 68 1 FPHR 4 11 FET MWD 68 1 HR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 890 01 1 4 90 350 01 1 4 90 356 99 1 4 90 358 01 1 4 90 810 01 1 4 90 180 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 1423 Tape File Start Depth = 15010.000000 Tape File End Depth = 77.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 358405 datums Tape Subfile: 2 1535 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 P~AW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 62.0 EWR4 54.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 3868.0 3861.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : 08-0CT-95 ISC 2.11 / MPDS 1.22 3.94 MEMORY 3916.0 110.0 3916.0 0 .1 54.8 TOOL NUMBER P0404CRG8 P0404CRG8 12.250 112.0 SPUD 9.10 57.0 9.0 1000 10.8 3.000 2.060 3.000 4.200 68.0 102.0 68.0 68.0 .00 .000 .0 0 REMARKS: MWD RUN 1. $ CN : BP EXPLORATION WN : MPF-70 FN : MILNE POINT COLIN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 ROP MWD 68 1 FPHR 4 7 FET MWD 68 1 HR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 810 01 1 4 90 180 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 250 Tape File Start Depth = 3920.000000 Tape File End Depth = 54.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61865 datums Tape Subfile: 3 315 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 3869.0 EWR4 3861.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 7064.0 7057.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MI/D TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 11-0CT-95 ISC 2.11 / MPDS 1.22 3.94 MEMORY 7112.0 3916.0 7112.0 0 60.0 75.2 TOOL NUMBER P0404CRG8 P0404CRG8 12.250 112.0 SPUD 9.20 58.0 8.5 1200 8.0 3.000 1.970 3.000 4.100 70.0 110.0 70.0 70.0 .00 .000 .0 0 REMARKS: MWD RUN 2. $ CN : BP EXPLORATION WN : MPF-70 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 ROP MWD 68 1 FPHR 4 7 FET MWD 68 1 HR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 810 01 1 4 90 180 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 211 Tape File Start Depth = 7115.000000 Tape File End Depth = 3855.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 410574 datums Tape Subfile: 4 276 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 7051.0 14928.0 EWR4 7024.0 14901.0 CNP 7031.0 14908.0 SLD 7066.0 14917.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIM UMANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE EWR4 ELECTROMAG. RESIS. 4 CNP COMPENSATED NEUTRON DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 23-0CT-95 ISC 2.11 / MPDS 1.22 3.94 MEMORY 14989.0 7112.0 14989.0 0 19.7 74.4 TOOL NUMBER P0442CRNSLDG6 P0442CRNSLDG6 P0442CRNSLDG6 8.500 7085.0 LSND 9.90 45.0 8.5 7O0 5.8 1.650 .70O 1.750 1.900 64.0 159.0 70.0 64.0 SANDSTONE 2.65 8.50O TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 3. $ CN : BP EXPLORATION WN : MPF-70 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 NPHI MWD 68 1 PU-S 4 7 RHOB MWD 68 1 G/C3 4 8 DRHO MWD 68 1 G/C3 4 9 PE MWD 68 1 BN/E 4 10 ROP MWD 68 1 FPHR 4 11 FET MWD 68 1 HR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 890 01 1 4 90 350 01 1 4 90 356 99 1 4 90 358 01 1 4 90 810 01 1 4 90 180 01 1 44 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 760 Tape File Start Depth = 14990.000000 Tape File End Depth = 7020.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 253158 datums Tape Subfile: 5 828 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: LIS O1 **** REEL TRAILER **** 96/ 5/ 6 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 6 MAY 96 9:04p Elapsed execution time = 10.23 seconds. SYSTEM RETURN CODE = 0 MPF- 70 MILNE POINT~ O# & Gas Cons. Commission Anchorage / /"/ / i? - ~:; .... ~, ~. ;; . J _,.._-;;_,._. ~' _ '---; ~ ;.,. -'- ~ -,-..,?:-;-~-~-:-~.- .... . -~:-:'- , .~t.'X-~ '-': ~ ~ ~ ~. -t. ,~t:~;:_ · '. , .~..,.: ¢~--' ....z:~-; ........ .:.. -:-- -.-~ r. ;--,--.-- _;...'::,~ --,--.;.., .... . ~:'~ ~-- .~ - '"'-':"-::?~..t,;:~. :' ~un 1' "" ' ...... 29 - Febma~ - 1996 Ma~ed Line GR Card Hole · !MICROFILMEg...r,, I/i/ . , . ATLAS Lb~ging Services 13500' 14885' '£ape Subfile, 2 is type:' IS TAPE HEADER MILNE POINT UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MPF - 70 500292260300 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 15-MAR-96 6609.00 D. BARBA FOX/MYERS 6 13N 10E 2189 2591 48.00 0.00 12.00 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 3RD STRING 9.625 7085.0 40.00 PRODUCTION STRING 7.000 14969.0 26.00 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS SBT GRCH 1 1 29-FEB~96 WESTERN ATLAS LOGGING SERVICES PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH $ SBT/GR/CCL. EQUIVALENT UNSHIFTED DEPTH REMARKS: ALL DEPTHS ARE WIRELINE DEPTHS (MARKED LINE) *** THIS IS THE DEPTH REFERENCE FOR THIS WELL *** PASS 1 WAS NOT DEPTH SHIFTED SINCE PASS 1 IS THE DEPTH REFERENCE FOR THIS WELL. SHIFT PROCEDURE AS FOLLOWS: 1) SECOND PASS GAMMA RAY DEPTH MATCHED TO FIRST PASS GAMMA RAY. FILE HEADER FILE NI/MBER: 1 EDITED CURVES Depth shifted and clipped curves for each run in separate files. PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GRCH 13468.0 14853.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE PASS NUMBER: BASELINE DEPTH $ REMARKS: EQUIVALENT UNSHIFTED DEPTH PASS 1 (MAIN PASS). NO DEPTH SHIFTS WERE DONE SINCE THIS IS THE DEPTH REFERENCE. CN : BP EXPLORATION WN : MPF - 70 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GRCH GR 68 1 GAPI 2 TENS GR 68 1 LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 30 995 99 1 4 4 30 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 34 Tape File Start Depth = 13465.000000 Tape File End Depth = 14855.000000 Tape File Level Spacing = 0.500000 Tape File Depth U~. .s = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8344 datums Tape Subfile: 2 137 records... Minimum record length: 62 bytes MaximUm record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 14342.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 for each run in separate files. STOP DEPTH 14606.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH GRCH 14347.5 14349.5 14361.5 14363.5 14373.0 14374.5 14395.0 14397.0 14405.0 14408.0 14425.0 14427.0 14449.5 14452.0 14485.5 14487.0 14490.5 14493.0 14499.5 14501.0 14529.5 14531.0 14535.0 14537.0 14553.5 14557.0 14558.0 14561.5 14571.5 14574.0 14575.0 14577.5 14592.5 14595.5 14593.5 14596.5 14594.0 14597.5 14595.5 14599.0 14596.5 14599.5 14597.0 14600.0 $ REMARKS: PASS 2 (REPEAT PASS) . TENS SHIFTED WITH GRCH /? ?MATCH2A. OUT $ CN : BP EXPLORATION WN : MPF - 70 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD' (TYP5 $4) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GRCH GR 68 1 GAPI 2 TENS GR 68 1 LB * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 7 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 30 995 99 1 4 30 995 99 1 Tape File Start Depth = 14340.000000 Tape File End Depth = 14610.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1624 datums Tape Subfile: 3 62 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER F I LE NUMBER: 3 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 13468.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CCL GR ACC KNJT SBT VDL CENT $ STOP DEPTH 14875.0 CASING COLLAR LOC. GAMMARAY ACOUSTIC COMMON KNUCKLE JOINT SEGMENTED BOND TOOL VDL SUB CENTROLLER 29-FEB-96 FSYS REV. J001 VER. 1.1 1728 01-MAR-96 14880.0 14893.0 13500.0 14885.0 1500.0 YES TOOL NUMBER 2317XA 1309XA 1633EA 3923XA 1424XA 1424PA 9999ZZ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 14969.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM): FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL R3~TIO: CHOKE (DEG) : BRINE 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT): 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 0 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 0 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1 (MAIN PASS). $ CN : BP EXPLORATION WN : MPF - 70 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 CCL GR 68 3 SPD GR 68 4 TTEN GR 68 5 TEN GR 68 1 GAPI 4 1 4 i F/MN 4 1 LB 4 1 LB 4 4 30 310 01 1 4 30 150 01 1 4 30 636 99 1 4 30 635 99 1 4 30 635 99 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 135 Tape File Start Depth = 13468.000000 Tape File End Depth = 14875.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 42119 datums Tape Subfile: 4 212 records... Minimum record ~ength Maximum record length 30 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 14342.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CCL GR ACC KNJT SBT VDL CENT $ STOP DEPTH 14606.0 CASING COLLAR LOC. GAMMA RAY ACOUSTIC COMMON KNUCKLE JOINT SEGMENTED BOND TOOL VDL SUB CENTROLLER 29-FEB-96 FSYS REV. J001 VERo 1.1 1620 01-FLAR-96 14880.0 14893.0 13500.0 14885.0 1500.0 YES TOOL NUMBER 2317XA 1309XA 1633EA 3923XA 1424XA 1424PA 9999ZZ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT) : 0.000 14969.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) : SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG) : BRINE 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 0.00 0.000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : 0.0 BASE NORMALIZING WINDOW (FT) : 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 0 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 0 TOOL STANDOFF (IN) : 0.0 REMARKS: PASS 2 (REPEAT PASS). $ CN : BP EXPLORATION WN : MPF - 70 FN : MILNE POINT COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Lo9 Crv Crv Size Length Typ Typ Cls Mod 1 GR GR 68 2 CCL GR 68 3 SPD GR 68 4 TTEN GR 68 5 TEN GR 68 1 GAPI 4 1 4 1 F/I~]' 4 1 LB 4 1 LB 4 4 30 310 01 1 4 30 150 01 1 4 30 636 99 1 4 30 635 99 1 4 30 635 99 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 26 Tape File Start Depth = 14342.000000 Tape File End Depth = 14606.000000 Tape File Level Spacin9 = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 7967 datums Tape Subfile: 5 103 records... Minimum record Iength: Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: LIS 96/ 3/20 01 **** REEL TRAILER **** 96/ 3/20 01 Tape Subfile: 6 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 20 MAR 96 6:34p Elapsed execution time = 3.90 seconds. SYSTEM RETURN CODE = 0