HomeMy WebLinkAbout2021 Kuparuk Undefined Pool
Greater Kuparuk Area
2021 Undefined Pool Report
Ugnu Formation
Reporting Period
January 1 to December 31, 2021
Page left blank intentionally.
Carlotta Chernoff
Manager, GKA Asset Development
Greater Kuparuk Area
ConocoPhillips Alaska, Inc.
ATO-1376
PO Box 100360
Anchorage AK 99510-0360
Phone (907) 263-4692
Ms. Jessie Chmielowski, Commissioner
Alaska Oil and Gas Conservation Commission
333 West 7th Ave. Suite 100
Anchorage, Alaska 99501
Re: 2021 Undefined Oil Pool Reservoir Report
Dear Commissioner Chmielowski,
In compliance with Title 20 AAC 25.517, ConocoPhillips Alaska, Inc., operator of the Kuparuk River Unit, is hereby
submitting the Plans of reservoir development and operation for Undefined Oil Pools. This report documents
the required information pertinent to the field development and enhanced recovery operations from January
through December 2021. The following is an outline of the information provided:
• Ugnu Formation – 2021 Report Operations Review (Attachment 1)
If you have any questions concerning this data, please contact Jerissa Hampton at (907) 263-3701.
Sincerely,
Carlotta Chernoff
Manager, GKA Asset Development
Greater Kuparuk Area
March 9, 2022
Page left blank intentionally.
Attachment 1
Ugnu Formation
2021 Report Operations Review
UGNU PILOTS/ STUDIES
The Kuparuk River Unit working interest owners re‐started the Ugnu Heavy Oil pilot and established stabilized oil
flow from well 1H‐401 during December 2013. A down hole heater was used to lower the oil viscosity sufficiently to
allow viscous oil to flow via a progressive cavity pump installed in the well. The well was online for approximately
10 cumulative months until it was shut in March 2016 due to a failed pump. In 2017 and 2018, elastomer studies
were completed to redesign a downhole pump more appropr iate for the fluid chemistry and downhole
conditions. A new pump design was installed in April 2019. The well was online for two weeks before the motor
failed. Evaluating rig workover alternatives to bring the well back on production. No development wells were
drilled in 2021. One well is planned in Q4 2022, 1C-501, to serve as a clean-water source well for planned West Sak
injectors on drillsite 1C.
GKA Annual Surveillance Report Undefined Oil Pool 5