Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout2018 Lookout Oil Pool
2018 Annual Reservoir Review Report, Greater Moose’s
Tooth Unit: Lookout Oil Pool
Form 10-412 for Lookout Oil Pool
Form 10-413 for Lookout Oil Pool
Safety Valve System Testing Results for 2018
March 29, 2019
2018 GMTU Reservoir Surveillance Report
Table of Contents
Lookout Oil Pool Annual Reservoir Review …………………………………….......... 1
Attachment 1: Greater Moose’s Tooth Unit Map …………...…….……….…..…...... 3
Attachment 2: Reservoir Pressure Map at Datum ………...............................….… 4
Attachment 3: 10-412 Pressure Survey Results …………….………….…...…..…… 5
Attachment 4: 10-413 Report of Injection Project ………….…………….…...…...… 6
Attachment 5: Safety Valve System Test Results ……….………….....……….….… 7
2018 GMTU Reservoir Surveillance Report
1
Lookout Oil Pool Annual Reservoir Review
ConocoPhillips Alaska, Inc., (CPAI) as Operator and sole working interest owner of the Greater
Mooses Tooth Unit (GMTU), submits this Lookout Oil Pool Annual Reservoir Review as required
for the Lookout Oil Pool Conservation Order 747, Rule 8.
1: Development Plans and Reservoir Management Summary
Lookout Oil Pool production and injection was initiated in October 2018. Lookout development
drilling began in March 2018 with six wells completed by year-end 2018. One additional well
was drilled in 2019 for a total of seven development wells (three producers and four injectors).
No additional Lookout drilling is planned in 2019. Producer MT6-06 was fracture stimulated in
March 2019.
The ongoing development scheme premises water injection with alternating gas injection for
pressure maintenance and improved recovery. Initiation of gas injection is planned for Q2 or Q3
in 2019.
Cumulative water injection in 2018 was 737 MBW , equating to less than 1% of the hydrocarbon
pore volume of the developed portion of the reservoir. W ater production in 2018 was less than
1% of total liquid production.
2: Reservoir Voidage Balance and Cumulative Status
The tables below summarize average daily injection and production rates, cumulative fluid
volumes, and voidage balance as of January 1, 2019. Water injection and voidage replacement
are low due to injection wells being drilled later in the drilling program. Now that all injectors are
drilled, injection is catching up with production and cumulative voidage is decreasing.
The following is a summary of the Lookout Oil Pool status as of January 1, 2019.
Lookout Oil Pool 2018 Metrics Daily Average Rate
(since 10/1/18) Cumulative Volume
Oil Production 9.4 MBOPD 0.8 MMSTB
Gas Production 18.2 MMSCFD 1.6 BSCF
Water Production 0.0 MBWPD 0.0 MMSTB
Gas Injection 0.0 MMSCFD 0.0 BSCF
Water Injection 8.2 MBWPD 0.7 MMSTB
2018 GMTU Reservoir Surveillance Report
2
Lookout Oil Pool 2018 Voidage Balance
Month
Cumulative Injection / Withdrawal
Ratio RVB/RVB
Injection / Withdrawal Rate
RVB/RVB
January - -
February - -
March - -
April - -
May - -
June - -
July - -
August - -
September - -
October 0.38 0.40
November 0.39 0.40
December 0.39 0.40
3: Summary and Analysis of Reservoir Pressure Surveys
Static pressure surveys were performed in six Lookout Oil Pool wells during 2018. Please see
Attachment 3 for the 10-412 report of reservoir pressures. The data are in agreement with
predictions from the numerical reservoir model, which is regularly updated with field data to
guide reservoir management and development activities in the field.
4: Results and Analysis of Production and Injection Log Surveys, Temperature, Tracer
Surveys, Observation Well Surveys and Special Monitoring
None of these surveys were performed for the Lookout zone in 2018.
5: Review of Production Allocation Factors and Issues
Well test and allocation review shows a total of 38 well tests were used to allocate production
from the Lookout Oil Pool in 2018.
2018 GMTU Reservoir Surveillance Report
3
Attachment 1: Greater Moose’s Tooth Unit Map
2018 GMTU Reservoir Surveillance Report
4
Attachment 2: Reservoir Pressures at Datum
Lookout Oil Pool
2018 GMTU Reservoir Surveillance Report 5
Attachment 3: 10-412 Pressure Survey Results by Pool - LOOKOUT
2018 GMTU Reservoir Surveillance Report 6
Attachment 4: 10-413 Report of Injection Project by Pool - LOOKOUT
2018 GMTU Reservoir Surveillance Report 7
DATE_TESTLPSWELL_TYPEWELL_NUMBERPERMIT_NUMBERSEPAR_PSISET_PSIL_P_TRIPLPP_TEST_CODESSV_TEST_CODESSSV_TEST_CODETEST_TYPERETEST_SI_DATEFIELD_UNIT_PADAOGCC_REP11/30/18156OILMT6-06218093015610098PPMALPINE / GMTU / MT6 MISCWAIVED10/09/18290OILMT6-052180450290500448PPNAMALPINE / GMTU / MT6 MISCWaived10/09/18290OILMT6-032180160290500492PPNAMALPINE / GMTU / MT6 MISCWaivedAttachment 5: Safety Valve System Test Results - 2018