Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout187-070Memorandum To: Well File: State of Alaska Oil and Gas Conservation Commission Cancelled or Expired Permit Action EXAMPLE: Point McIntyre P2-36AXX API# 029-22801-95 This memo will remain at the front of the subject well file. Our adopted conventions for assigning APl numbers, permit numbers and well names did not specifically address expired or cancelled permits. This omission has caused some inconsistencies in the treatment of these kinds of applications for permit to ddll. Operators have asked us to adopt formal procedures for this class of permit application in order to prevent future database disparities. If a permit expires or is cancelled by an operator, the permit number of the subject permit will remain unchanged. The APl number and in some instances the well name reflect the number of preexisting reddils and or multilaterais in a well. In order to prevent confusing a cancelled or expired permit with an active well or multilateral these case sensitive well identifiers will be changed for expired and cancelled applications for permits to drill. The APl number for this cancelled or expired permit is modified so the eleven and twelfth digits is 95. The well name for a cancelled or expired permit is modified with an appended xx. These procedures are an addendum to the APl numbering methods described in AOGCC staff memorandum "Multi-lateral (weiibore segment) Ddiling Permit Procedures, revised December 29, 1995. AOGCC database has been changed to reflect these changes to this permit. St'eve McMa~ns ' ~ Statistical Technician TELEPHONE NO: Lonnie C Smith 7~'~ SUSJEC~ Commissioner Status of Alaskan Crude Corporation' s 3 wells FROM: Blair E Wondzell Sr Petroleum Engineer Alaskan Crude Corporation (ACC) and its predecessor, Far Nor=h 0il & Gas (FNOG), have entered and or drilled three wells as follows (also see ~he attached listing :'ALASKAN CRUDE CORP Status of Approved Drilling Permits"): --- 02-001A (Rev. 8185) I/emo t:o CVC December 9, 1987 Page 2 Additionally, ACC applied for permits ~o drill wells which were issued on 7/31/87 amd 8/24/87 ~3and BRX 22-1 respectively). In view of the very sloppy compiiance with our regulations and the reporting, we should consider some means to obtain betzer compliance. Possibilities include a strongly worded letter, retraction of the new permits, issue no additional drilling permits to ACC until compliance on existing well is obtained, or some other punitive measure. ~ 7- 7'0 ~np,o 'z 7/?t lb ~ r.-t$-I~ Sp'~ ........... July 31, 1987 Mr. David J. Oryall Vice President Alaskan Crude Corporation P. O. Box 11-1187 Anchorage, Alaska 995!1 Telecopy: (907) 276-7542 Re: BFC 31-1 Alaska Crude Corporation Permit No. 87-70 Sur. Loc. 300:FSL, 300'FEL, Sec. 31, T2N, R12W, SM. Btmhole Loc. 2640'FSL, 2640'FEL, Sec. 31. T2N, R12W, SM Dear Mr. Oryall: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. ¥*~ere a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. C. V. Chatterton:: Cha i~an o f Alaska Oil and Gas Conservation Co~ission dlf Enclosure cc: Department of Fish & Game, ttabitat section w/o encl. Department of Environmental Conservation w/o encl. Mr. Bill H. Lamoreaux Alaskan Crude Corporation P.O. Box 11-1187 Anchorage, Alaska 99511 (907) 522-5232 July' 23, 19 87 Mr. Bill Van Alle~l Mr. Mike Minder ~./' ~47. Alaska Oil and Gas Conservation Commission 3001 Pocupine Drive Anchorage, Alaska 99501 RE: Application for permit to drill Alaskan Crude Corporation's Well No. BFC 31-1 Gentlemen: Pursuant to our phone conversation on July 21, 1987 and in answer to your questions please find enclosed 3 copies of an addendum to the aforementioned Permit to Drill Application. Thank you for all the assistance you have provided Alaskan Crude. Please let me know if there is anything else I can. provide for you. Sincerely, ALASKAN CRUDE CORPORATION Vice President/Exploration w/enclosures cc: N. K. Goff Burglin et.al File ADDENDUM TO PERMIT TO DRILL ALASKAN CRUDE CORPORATION WELL NO. BFC 31-1 1.) Presently available data from adjacent wells indicates the absence of abnormal pressures and we do not expect to penetrate overpressured strata in our proposed well. 2.) Alaskan Crude Corporation hereby requests the Commission to waive the requirements of 20 AAC 25.061. Well Site Surveys pursuant to paragraph "C" of said regulation. 3.) Excess cement will be available on location for the cementing of all casing to accomodate the fill up factor needed for excess hole capacity caused by wash outs as shown on the caliper logs. 4.) Schematic and [list of~mud system per 20.AAC~.2,5~033 '~ ,~ 5.) After consideration of the collapse~ rating of the 26# 7" liner listed on our application we have decided to change the casin~' program to specify 29#, 7" liner instead. MUD SYSTEM~ 10'W x 8½'H x 38'L 575 Barrel Mud Suction Tank w/5'L Porch Extension, 3-Compartment, Slant Bottom, Internal Plumbing, Walkways, Stairs, Safety Rails, Skidded DEMCO 6" x 8" Centrifugal Pump, ' S/N 9252, w/RELIANCE 75 HP Electric Motor, DEMCO 6" x 8' Centrifugal Pump, S/N 9253, w/RELIANCE 75 HP Electric Motor, w/Mud Hopper, Individually Skidded on 8'W x Z3'L Covered Skid 10'W x 8½'H x 38'L 575 Barrel Mud Volume Tank w/TL Porch Ext.-nsion, 3-Compartments, Slant Bottom,. Internai Plumbing, Walkways, Stairs, Safety Rails, Skidded (Z) DEMCO 5".x 6" Centrifugal Pumps, Each w/RELIANCE 75 HP Electric .Motor 10'.W x.8½'H x 38'L 575 J~arrel Mud Shaker Tank w/7'L Porch Extension, 3-Compartments, Slant Bottom, Internal Plumbing, Walkwa}'s, Stairs, Safety Rails, Skidded DEMCO 5" x' 6" 'centrifugal Pump, S/N 9171, w/MARATHON 50 HP Electric Motors TRI-FLO 133Z96 Tandem, Double Screen, ~'ibrating Shale Shaker, S/N TFSHD1008, w/(Z) PACEMAKER 3 HP Electric Motors TRI-FLO 133557 Desilter, S/NTFDS1075,' w/(16) 4" Cones ~5) MORSE Mud Agitators, (4) p/b 10 HP Electric Motor, (1) p/b 5 HP Electric Motor STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of' work Drill ~ R~;drill IDI 113. Type of well. Exploratory [~ Stratigraphic Test I:3 Developmenl Oil ReEntry ,~ DeepenI:~ Service [3 Developement Gas C. Single Zone ~ Multiple Zone 1:3 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Fmeld an0 Pool - AT,ARWAM ~PTTI3~ ~(]RPnPATT(]M ,KB 22 feet Offset t.o ~3. Address 6. Property I~esignation F a 1 1 s C r e ek Un i t P.O. Bo, x 1,1,,-l187,,Anchora~e 99511 ADL 369211 4. Location ol well at surface S e c. 3 1, T ~N, 7.'Unit or properly Name 11. Type Bo~d 1300'FSL & 300' FEL R12W, SM Bur~lin Et. Al. Blanket At top of productive interval 8. Well nur~ber Number Beluga FM 2400+~,.. Tyonek .54D0+/- BFC 31-1 100005217 At total depth 2 6 4 0 ' F SL, 2 6 4 0 ' FEL 9. Approximate spu(~ dalej" Amount ~.- ~ .~ . )~o['~ . Sec. 31, T2N, R12W, SM ~.-.' ._..' ~-~:.. !: ~,~:,~. ~: · .... ,~ ~ $200,000.00 12. Distance to nearest 13, Di'sta'nce to nearest w~ll 14. Number of acres in propert) 15. ProDosecl property line 11709 ' 2640' feet 5500' leer 2621 .48 10600' TVD feet '16. To b~ compieled tor ¢leViated welis 17. Anti'cipated pressure ,.. ~o ~ ~.~ .~z~ Kickoff depth 7 0 0 leer Maximum hole angle 4 5' -.,,.,,.-.,,-~. 1 1 0 0 "~*''~"w ^, ,o,., ~ ~,vm 4 1 7 5 18. Casing program .... Settin~ Depm ' " size Specifications 'lop Bottom Ouantity of cement Hole Casing Weight Grade Coupling L~gth MD t TVD MD TVD (include stage c~ata)' 30" ~ 133 ERW ~T~WELD 1~0' COND~CTo~i00 Same N/A 26" ~20-" 106._~ K~5 BTC fO0'i SURFACE 600 Same 161 BBLS ' 17'"~", ~ , 13'3/8' 68 .... ,K"55 BTC 25001 'SADIE 2500 2321 310 BBLS 12¼" 95/8" ~7 N'~0Sm:~BTC 1010~ saz e [010~ 9000 56 BBLS See Drl~ 8~" 7 2~:Nl~0sm.[ BTC '1900,,] 9809 8700111,70~ 10600 44 BBLS 19. To be complet~d for Redrill, Re"er~try, and Deepen 0'perations' Present well condition summary Total depth: measured -feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size. Cemented Measured depth True Vertical depth Structural COnductor Surface - Intermediate Production Liner Perforation depth: measured · true vertical ' 20, Att:~cnmems Filing fee-- t:h-o[:;ert'~ p'lat ~ "BOP $~etch~_ D,verter ~etcn~_. Drilhng'program ..~ · Drilling fluid program]{= Time~'v~ OeDth plot ~ Refraction analysis _- Sea:)ec repot1 _-- 20 AAC 25.050 reouirements 21. ' hereWt~.j~ :~~o,ng ~? and correct tothe best of my kriS,edge ,. (/ / '. ....... 0.,, ,,, ' ~- 7-- 7~ 50-- i .~_3 --.~q~ ~'~f '~ 7-31-87 for other reau,remen~ Oonclitions ot apprcwnl ~ml~les reclu',r~:~ ~¥es = No Mu~ log ,equ,re~ '~ Yes : N'O Hydrogen 5ulflcle measures ~ Yes ~ No Directiona. l~su~ey reclu~rec[ ~_Yes '- No Required work~ng pr~'O~ for I~PE~---~M~.~ 3~; ~ SM' ~ 10M; ~ 15M Form 10.40'1 Rev. 12-1-85 / Sul~r .ate SUM~RY PROGRAM ALASKAN CRUDE CORPORATION BURGLIN FALLS CREEK 31-1 1.) Drive 30", 133# conductor to 100'+/-. Install 30" Bell Nipple and Flow line. 2.) D~i~ll 26" hole to 600' +/-. No logs planned. Run and cement~20'', 106.5# casing' Land casing and. install 20" API 2000 wp SOW casing head. 3.) Perform as built survey of wellbore. Install 20" diverter system as shown on attached illustration. Notify AOGCC and test diverter and hydraulic valve. ~ 4.) Drill out shoe of 20" casing. Dri/ll 12 1/4" hole to 700' KOP. Directionally drill 12 1/4" hol~to 2500' +/-. Log hole. Open hole to 17 1/2"- Run and cementrl3 3/8" 68# casing. Land casing and install 20" API 5000 PSI wp x 13 5/8" API 5000 PSI wp casing head and install 5000 PSI wp BOPE consisting of RSRRA as per attached illustration. Notify AOGCC and test BOPE. 5.) Drill out shoe of 13 3/8" casing and run leak off test. Directionally drill 12 1/4" hole to 10109 +/-. Log hole. Run and cement 9 5/8" 47# casing. Final cement volumes to be determined from caliper log. ~ ~,~ ro~? 6.) Drill out 9 5/8" casing shoe and perform leak off test. Drill 8 1/2" hole to 11,709' +/-. Log hole. Run and cement 7" 26# liner. 7.) Test liner lap. Run drill stem tests based on formations encountered and according to supplemental program. 8.) Suspend or P and A well. Move out and clean up location. Notes: 1.) BOPE will be completely tested weekly, and more frequently if needed. NOTE FLUIOS TO 8E DIVERTED DOWNWIN0, AWAY FROM RIG 8Y CLOSING APPROPRIATE I0 INCH BUTTERFLY VALVES. TO 8ERME0 STORAGE AREA TARGETED IO MANUAL BUTTERFLY VALVES (NORMALLY OPEN, HANDLES TO BE LINKED TOGETHER SO 80TH VALVES CANNOT 8E CLOSED AT THE SAME TIME.) TO BERMED STORAGE AREA t! IO SCHEDULE 40 STEEL PIPE HYORAULIC VALVE, NORMALLY CLOSED (OPENS AUTOMATICALLY WHEN DIVERTER IS CLOSED) ! / / ~CELLAR - 12' DIA. Figure 1 Diverter system layout. BELL NIPPLE ! 20" 2000 PSI ANNULAR PREVENTER FILLUP LINE ~\\\ ~ ~ t I :,./ I I // RING GASKET t~=~.. .2' GATE VALVE~. 2' KILL' LINE RING QASKET.~ 2' BULL PLUG i DRILLING SPOOL , 20" 2000 8OW ylO' HYDRAULIC VALVE (OPEN8 AUTOMATICALLY WHEN ANNULAR PREVENTER CLOSES) [~ TO N,OTE · DIVERTER LINES HAVE DOWNWIND DIRECTIONAL DISCHARGE CAPABILITY. BULL PLUG CONOUCT'R PIPE TO (GR) Figure 2 20-inch wellhead diverter system schematic. 5.000 PS1 WP ANNULAR PREVENTER .-...a,- FLOWLINE ~*.,O00 PSI WP PIPE RAId8 i-- /' 5,000 PSI W~BLINO RAM8 ~ , , 3" KILL LINE ;i.,,jlllI ,.,.. , 4' CHOKE LINE ~ ~L~'-"~L~'~~=-~' SPOOL CHECK GATE GATE L,I~;;I~i, ~,,.:ill GATE H.C.R. VALVE VALVE VALVE , ]U,IlttIit...~, ~,,~ V~VE VALVE . [. I ~',.~ ' ',',,! I ! TO 10,000 WP CHOKE MANIFOLD Figure 3 B.O.P. stack configuration,13~Sinch triple ram stack with annular pressure. MUD PROGRAM Section: 0-600 ' Hole Size: 26" Casing Size: 20" Mud Type: Spud 25/30 PPB gel for viscosity of 200 sec/qt treat out ca++ with 1/2 PPB Soda Ash maintain viscosity and volume with addition of Gel. Adjust viscosity as hole conditions dictate. Section: Hole Size: Casing Size: Mud Type: , Weig~ht. - Viscosity: PH: PV: Yield Point: 600'-2500" 17 1/2" 13 3/8" Gel/water Mud Parameters 8.8 - 9.7 PPG 100 - 125 sec/qt. 9.0 - 9.5 8 - 12 20 - 30 Fluid Loss: NC Mud Program Page # 2 Section: Hole Size: Casing Size: Mud Type: 2500' - 10,109' 12 1/4" 9 5/8" Co-Polymer Weight: Viscosity: PH: PV: Yield Point: Fluid Loss: Section: Hole Size: Casing Size: Mud Type: Weight: Viscosity: PH- · Mud Parameters 8.8 - 9.5 PPG 40 - 44 sec/qt. 8.O - 8.5 6 - 12 22 - 30 12 - 14 cc/30 min API Reduced to < 6 cc/30 rain API by Target Zone 10,109' - 11,709' 8 1/2" 7" Liner Co-Polymer Mud Parameters 9.5 - 10.0 PPG 40 - 44 sec/qt. 8.0-8.5 PV: 6 - 12 Yield Point: Fluid Loss: 22 - 30 < 6 cc/30 rain API Completion Fluid NaC1 Brine to appropriate weight (PPG) as dictated by drilling results. I-I~ ~MMMO S77VM NITOM~ NOI£VMOJMOD MG~MD NVMSVTV SIVG 0V .CE Og gZ OZ gI OI g _11 i i i i i ~MTOH .g/I ~ 77IM~ ~ ONISYD ,000'~I ,000'II ,000'0I ,0006 ,000~ ,O00L ,0009 ,000~ ,O00V ,O00g ,O00g ,000I ' i , 000 1 =,, I STEVE COWPER, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 TELEPHONE (907) 279-1433 Telecopy No. (907) 276-7542 June 5, 1987 N. K. Goff, President Alaskan Crude Corporation P. O. Box 111187 Anchorage, AK 99511 Dear Kelly: This letter formally acknowledges our receipt of a completed Designation of Operator (Form 10-411) for each of the following two undeveloped properties: a. State Lease ADL No. 326070 Sections 16, 17, 18, 19, 20, 21 and 360 Acres of Section 22, T13N, R10W, SM. b. State Lease ADL No. 369211 Sections 19, 20, 29, 30, 31 and 52 acres of Section 32, T2N, R12W, SM. These two documents attest to the desire of Cliff Burglin & Associates (ADL No. 326070) and Cliff Burglin and Kelley Everette (ADL No. 369211) to relinquish their roles as operators for these properties, and to the intent of the Alaskan Crude Corporation to accept operatorship for these properties. Alaskan Crude Corporation has on file with the Commission a blanket bond in good standing should a decision be made to drill on either property. Accordingly, the transfer of operatorship is approved. Sineerely~f} . Lonnie C~. Smith Commissioner BY ORDER OF THE COMMISSION c: Cliff Burglin & Associates C. Burglin/Kelley Everette jo/1 .C.8 _. "S~flOi 1-13~30N IS ' · ('llI~A3~S HIIM 8NION3~ ~ i~W SIHI> '8~III~I3~ NOI£O~IO0~ ON~ S3~fl£OA~£S ON~ i~O~W31 H£08 lJfl~£SN03 Ol ~N~ ~ZI~Ilfl Ol ON~ S~M ON~ qIO AN~ ~0 8NI~I~O ~0~ S£IW~ qq~ AN~ NI~lSO 0£ W~qO ~N~IOI~BW O~MBS 'ISBM ~t BON~ 'H£~ON '~ ~IHSNMO£ .. NOI£OBS ~0 9/~S q~NOIi3~ ~ 103 INBWN~BAO8 NMO I. ~NOISSIWWO3 - NO£~iI~H3 ~HO.' NOISSIWWO3 NOII~A~SNO3 8~80N~ ~I0 Z0~66 ~;~S~q~ 'SMN~8~I~~ .. I~l X08 Od 088~--9~9 0968~ X08 O~ ~DE~- FILED REC. DIS! eIi i . · LOCATE~D I.N.G. OV~ LOT I,,N'f.~AC"I'IONAL $EI/4 SE( '31 'f2N' I~I,!W.." a.M.; CLAM GULCH.ALASKA 99568 · · · · SCALf.,I"-.2._O_O' ~R_EA-28.64.8. AC..._.. dULY20, !96~ H~. NIPPON SU'ISAN g~lSHA LTD. mO01 4lb &vl. S£AT'~LE, W&..~RIS · ,I.,E G E ND IVIAP e-- 5/8"X 30'"rebor set· PLAT APPROVAL II I , t m III.II II This ploI w~'S oppfoved by the Kcnqt Peninr. ulo I~orough I)lonnin~ Com- -misslo.n et the meet,rig of --.- 19R2, for r~.cordimj by Ihe Stnte R,~cordor os o De-.d ~f Record Boundory Survey· . BY &ulhortzed Officool ~'' $/4"X 3' G.I.P W/bros~ Cop (1'~.74) t.y 268- S. found. . o--I/Z"rebor found- R'S 'CERTIFICATE " · · eby cerlify Ih,! ~e are the ,who-rs . property'tbown ,nd d~scribed hereon, ot we hereby od,pt thts I. IOfl of Jsiofl, find 9rflflt all' eosements 1o . hOwn - ! · ., · . ' - '~ ~. "- ! · .- ~, '1' . .- : L~ '""~ '" " ' ' .... ~-~':'~ ?-~ "" : "c.' '' '~'.~. 8. / ....... ._. .........------.... . . .. . ... ~ ) ~t~[e &ND swO~k TO ~r~o~r ,, Y~ . - . -% ~ S~lO'[Io?~-o' /' "' ""0' ' '" ~-. :. : ~ .' . . ~ . .... -.// :. . ~ , V, ':.~ ~. . , .... ,,~ ~'-,, _.- .. ~ ~ 9 /Z~ '. '.' e '-' ~3 ~] S~ u /.~/ ~ ........ . ~ .' '. . . . - . ~ - .~' . 11~:. -~ ~ ." _ -'~ ~_F2 = / ~ ]i ~1~ -- ~ ~ ~ . ~ '~- - i o · ,. ... / 7111l" ~ ~ -- -! ~ e. ~ e ~ c. . ///11/~' - -I ~(,2~c*,,0., ,Y~:- . - .... ., ~- · . ., ~Y': ~',/"~ '~i .' ' .Se.c.. I:,f~e BEARING .... TO ROW BASE -. &d liW DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL AND GAS April 28, 1987 STEVE COWPER, GOVERNOR P.O. BOX 7034 ANCHORAGE, ALASKA 99510-7034 (907)762-4241 Mr. Brian Burglin P. O. Box 131 Fairbanks, Alaska 99707 Re' ADL 369211, Cook Inlet Dear Mr. Burgl in' I have reviewed your letter to me dated April 15, 1987 concerning directional drilling into oil and gas lease ADL 369211 from an adjacent location. Because the oil and gas rights under your proposed drill site currently are reserved to the state, I disagree with your conclusion that you have the "right" to drill at this time. However, it may be possible to authorize you to drill from your proposed site even though the lands are unleased. Paragraph 12 of oil and gas lease ADL 369211, ll AAC 83.145 and ll AAC 83.150 apply to existing oil and gas leases. The uplands portion of the SE 1/4 of Section 31, T. 2 N., R. 12 W., S. M. (identified as Government Lot #1 on tile plat attached to your letter) currently is not under oil and gas lease; all oil and gas rights in that tract are reserved to the state. As a result of this reservation, no party except the state currently has the right to drill for oil and gas on the tract or to drill through the tract into an adjoining tract. However, the Commissioner of Natural Resources has discretion to grant authorization to drill through Government Lot #1 to assist Burglin in its efforts to drill into ADL 369211. I will be contacting you in tile near future concerning the type of authorization that possibly could be granted and some of the terms and conditions that might be included in such an authorization if it were granted. In your phone conversation with Mr. Bill Van Dyke you mentioned that you also would be applying for an Exploration Incentive Credit for your proposed well. A review of your lease indicates that you are not eligible for an Exploration Incentive Credit. Mr. Brian Burgl in April 28, 1987 Page 2 In the interim, please contact me if you have any questions. Sincerely, James E. Eason Director _/~ f by William Van Dyke /~ Acting Director 0726E C. Burglin l.and Con~uhant P.O. Box 131 Fairbanks, Alaska 99707 (907) 452-5149 April 15, 1987 James Eason State Division of Oil and Gas P.O. Box 107034 Anchorage, Alaska 99510-0734 Re: ADL 369211 CONFIDENTIAL Dear Mr. F~son- I It has recently come to Burglin et al (Burglin's) attention that oil and gas rights reserved to the State under governmental lot #1 located in the SE¼ of Section 31, T2N, R12W, Seward Meridian are un]eased at this time. Burglin has recently purchased the sur- face riLfnts to governmental lot #1 for use as a drill site. Govern- mental lot ~1 consists of 28.6118 acres, more or less. The remainder of Section 31 oil and gas rights are urider lease to Burglin. Burglin has discussed this issue with Mr. Bill VanDyke of your staff. It is clear under 11AAC 83.145 Directional Drilling Clause and 11AAC 83.150 Reservations (a) (4) and (5) that Burglin has a right to directional].y drill from governmentallot ~1 in order to bottom- hole and access ADL 369211. . Burglin would like to get this matter resolved as it is Burglin's intent to construct a drill site on governmental lot #1. There appears to be no department procedures.for this situation. Please advise in writing- Sincere] y, Brian Burg/in ' 98 7 BB / mbg cc: Bill VanDyke (enclosure) Alaskan Chide Corporation - Dave Oryall RECEIVED ~NITED STATES DEPARTMENT OF THE INTERIOR GEOLOG.IiC~L SURVEY 151'30 - (1) Fee (3) Admin ~ 7-f~r~ (9. ~ru 13) '(14 thru 22) 1. Is the pemnit fee a~--~ached .......................................... Z~ --- ,, 2. Is well to be located in a dafined pool ............................. 3. Is well located proper distsnce from prop~ ]~ne .................. 4. Is well located proper d4~tance from other wells .................... 5. IS sufficient undedicated acreage avai~le in this pool 6. Is well to be ' ~cg~.~_and is we..bore plat includad ...... ?. IS operator the or~ly affected pa_~ ................. il... 8 Can permit be approved before fifteen-day w~it · .... ce...®............ 9. Does operator have a bond in force .................................. ~ 10. Is a conservation order needed ...................................... 11. IS administrative approval-needed ................................... 12. Is the lease number appropriate ..................................... ~ 13. Does the well have a unique namm and number .......................... ~ 14. Is conductor string provided ........................................ ,, 15. Will surface casirg protect fresh water zones .... 16. Is enough ¢~t u~ed to circulate on conductor ~t'~gg'l. 17. Will c~nt tie in surface and intermmd4~te or production strings ... 18. Will cement cover all known productive horizons .. 19. Will all casing give adequate safety in collapse, 20. Is this well to be kicked off from an existing we!lbore ............ ,, 21. Is old we..bore abandonm_=nt procedure included on 10-403 ............ 22. Is adequate wellbore sepamation proposed ............................ 23. Is a diverter system re~red .......................... · ............. 24. IS the d~ fluid program scb~n~tic and Li~t of equipmont adequate 25. Aze necessary diagr~m~ and descriptions of diver=er and BOPE atta~d. 26. Does BOPE have sufficient pressure rating - Test to ~o~o psig .. 27. Does the choke manifold c~mply w/API RP-53 ~May 84) .................. of ~S gas probable 28. IS the presence ................................. Nd. (29 t2~ 31) (6) Add: ,'~..~.,~. rev: 01/28/87 6.011 For exploratory and Stratigraphic wells: 29 Are data presented on potential overpressu=e zones? .................. 30. Are seismic am~lysis data presented on shallow gas z~nas ............. 31. If an offshore loc., are survey results of seabed conditions presented · : POOL CLASS STATUS AREA NO. ~HORE ,