Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PBU CCP FFGU / BP Exp
STATE OF ALASKA AOGCC GAS DISPOSITION FILES YF;AR: 2005 FACILITY: PBU CCP/FFGU OPERATOR: BP EXPLORATION (ALASKA) INC STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition Janua -2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Sold 6 2 334 595 Total Volume. . , , Pool Name Pool Code Percent 7 Reinjected 230 162 202 PRUDHOE 640150 100.00% . , , 8 Flared or vented 1 hour or less 7$$ . 9 Flared or vented more than 1 hour (see instr ) Q . . 10 Pilot and Purge 33 962 . , 11 Used for lease operations (specif in Remarks) 411 465 6 . y , , 12 Other (see instructions) 0 Oftioia{ Use Only . Authorization >i hr: MCF 13. TOTAL VOLUME (ITEMS 6-12) 239 203 751 Safety , , MCF 14. NGL Gas Equivalent 0 Lease Use MCF 15 Purchased gas 0 Conservation . Waste: MCF f8. Transferred from: CGF & FS1 239,203,751 17 Transferred to: (Express as a negative #) Q Commissioner Date . i8. Remarks: Block 11: Fuel Gas = 6,411,465 mscf and Assist Gas = 0 mscf I hereby certify that the f regoing is true d co t to the best of my knowledge. ~ Note: All volumes must be signature '~ Title Mana er, Production Taxes and Ro alt corrected to pressure of 14.65 psia ' and to a temperature of 60o F. Printed Name Bernard W. Ha'n Phone (907)564-5028 Date ~'"r~~ Authorit 20 AAC25.23 . Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT January 2005 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME' DESCRIPTION OF INCIDENT & CAUSE ACTION.TAKEN TO ELIMINATE-0AUSE 1/11/2005 1600-1605 141 Not required for unplanned events which Not required for unplanned events which 1/11/2005 1853-1858 8 are less than or equal to 1 hour are less than or equal to 1 hour 1/13/2005 1145-1150 45 1/13/2005 1240-1245 45 1 /16/2005 1945-1950 141 TOTAL 380 Unplanned Events rester than 1 hour DATE TIME.'.. ' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mcf DATE ' TIME VOLUME DESCRIPTION OF INCIDENt!& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/11/2005 0906-0911 135 See attachments See attachments 1 /11 /2005 0915-0920 8 1 /11 /2005 1010-1015 14 1 /12/2005 1445-1450 141 1 /30/2005 1520-1522 51 1/30/2005 1550-1552 45 1 /30/2005 1630-1632 14 TOTAL 408 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL TOTAL Unplanned Events < 1 Hour 380 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 408 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000. MCF Pilot Purge 33,962 Assist 0 TOTAL FLARED VOLUME 34,750 2/7/2005 9:12 AM #; ~~~~ BPXA FLARE REPORT ~~ . E :. ~~.:... ~ PRUDHOE BAY REPORT NO: O`J-0016 FACILITY: CCP DATE: 11 Jan 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 09:06 09:11 0 Hrs 5Mins ^ ^ © 135 MSCF 2. Flare/Relief Valve 09:15 09:20 OHrs 5Mins ^ ^ © 8 MSCF 3. Flare/Relief Valve 10:10 10:15 OHrs 5Mins ^ ^ © 14 MSCF 4. Flare/Relief Valve 16:00 16:05 OHrs 5Mins ^ ^ ^ 141 MSCF 5. Flare/Relief Valve 18:53 18:58 0 Hrs 5Mins ^ ^ ^ 8 MSCF TOTAL VOLUME 306 MSCF First Determination of Cause: 1. T/C 1801 shut-down for maint. 2. T/C 1801 ESD turbine to completely depressure system for maint. 3. T/C 1801 Spin Cool 4. T/C 1801 shut-down after restart, instrumentation problem 5. T/C 1801 shut-dowm during attempted restart Action Taken to Stop Flaring: 1. System depressured 2. System depressured 3. System depressured 4. System depressured 5. System depressured Tuesday, January 25, 2005 Page 1 of 1 REPORT NO: 05-0018 ~~~_~ BPXA FLARE REPORT ~~ ,=~ PRUDHOE BAY ~~;~;~~ FACILITY: CCP DATE: 12 Jan 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 14:45 14:50 OHrs 5Mins ^ ^ © 141 MSCF TOTAL VOLUME 141 MSCF First Determination of Cause: 1. T/C 1801 shutdown for maintenance on SO system. Action Taken to Stop Flaring: 1. T/C 1801 depressured. Tuesday, January 25, 2005 Page 1 of 1 REPORT NO: 05-0032 ~', _) ~~~~~~. BPXA FLARE REPORT ,~~t.~;z, PRUDHOE BAY FACILITY: CCP DATE: 16 Jan 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 19:45 19:50 OHrs Shins ^ ^ © 141 MSCF TOTAL VOLUME 141 MSCF First Determination of Cause: 1. T/C 1807 ESD'd from LCR for major overhaul and Mark VI conversion. Action Taken to Stop Flaring: 1. Depressured TIC 1807 Tuesday, January 25, 2005 Page 1 of 1 REPORT NO: 05-0064 ~y=.~~`~~ BPXA FLARE REPORT ,~ . ~.: PRUDHOE BAY «-~' ; '~ FACILITY: CCP DATE: 30 Jan 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 15:20 15:22 OHrs 2Mins ^ ^ © 51 MSCF 2. Flare/Relief Valve 15:50 15:52 OHrs 2Mins ^ ^ © 45 MSCF 3. Flare/Relief Valve 16:30 16:32 OHrs 2Mins ^ ^ © 14 MSCF TOTAL VOLUME 110 MSCF First Determination of Cause: 1. ESDT/C 1807 during a pressure test. 2. Vent down T/C 1807 to 100 psi after pressure test to 500 psi. 3. Ventting T/C 1807 to make a repair. Action Taken to Stop Flaring: 1. T/C vented down to 0 psi. 2. T/C vented down to crank pressure, vent valve closed. 3. T/C 1807 vented to 0 psi. Monday, January 3l, 2005 Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition Februa -2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 031 124 3 Total Volume. s. sold , , Pool Name Pool Code Percent 225 211 602 PRUDHOE 640150 100.00% 7. Reinjected , , 1 211 8. Flared or vented 1 hour or less , 0 9. Flared or vented more than 1 hour (see instr.) 691 30 10. Pilot and Purge , 961 948 11. Used for lease operations (specify in Remarks) , 5, 0 Official Use Only 12. Other (see instructions) Authohzation >1 hr: Safet MCF 627 199 220 y 13. TOTAL VOLUME (ITEMS 6-12) , , Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 0 15. Purchased gas Waste: MCF 16. Transferred from: CGF & FSi 220,627,199 0 Commissioner Date 17. Transferred to: (Express as a negative #) t8. Remarks: Block 11: Fuel Gas = 5,961,948 mscf and Assist Gas = 0 mscf I hereby certify that the forergoing is true and c rr ct to the best of my knowledge. Note: All volumes must be Signature ~ '`~, Title Mana er, .Production Taxes and Ro alt corrected to pressure of 14.65 psia t and to a temperature of 60o F. Printed Name Bernard W. Ha'n Phone (907)564-5028 Date / ~~ ~~-.1 A th rlt 25.2 Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT February 2005 Unplanned Events less than or equal to 1 hour ~ I DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/7/2005 2150-2i 55 8 Not required for unplanned events which Not required for unplanned events which 2/7/2005 2205-2210 8 are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 16 Un tanned Events reater than 1 hour DATE TIME VOLUME :' DESCRIPTION OF INCIDENT: & CA ' SE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equai 1 Hour AND Not Exceeding 5000 Mcf ~ DATE TIME VOLUME DESCRIPTION OF INGDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/2/2005 1325-1330 135 See attachments See attachments 2/2/2005 1625-1630 14 2/6/2005 1850-1855 141 2/8/2005 1230-1235 135 2/9/2005 1320-1325 156 2/9/2005 1640-1645 80 2/10/2005 2220-2225 135 2/11 /2005 0215-0220 8 2/11 /2005 0500-0505 8 2/11 /2005 1040-1045 77 2/11 /2005 2030-2035 135 2/11 /2005 0840-0845 3 2/11 /2005 1345-1350 3 2/12/2005 0225-0230 141 2/12/2005 0530-0535 8 2/12/2005 0555-0600 8 2/12/2005 0910-0915 8 TOTAL I I I J J Page 1 3/16/2005 3:53 PM BP EXPLORATION (ALASKA) INC. Page 2 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT February 2005 Planned Events Exceeding 1 Hour OR Exceedin 5000 Mcf DATE ` :TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN. TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 16 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 1,195 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 30,691 Assist 0 TOTAL FLARED VOLUME 31,902 3/16/2005 3:53 PM REPORT NO: 05-0069 b ,. BPXA FLARE REPORT r~ PRUDHOE BAY FACILITY: CCP DATE: 02 Feb 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 13:25 13:30 OHrs 5Mins ^ ^ © 135 MSCF 2. Flare/Relief Valve 16:25 16:30 OHrs 5Mins ^ ^ © 14 MSCF TOTAL VOLUME 149 MSCF First Determination of Cause: 1. Turbine Compressor 1804 Shut Down for maintenance. Normal stop. 2. Turbine compressor 1804 spin cooling complete, ESD from local control room, shut down for maint. Action Taken to Stop Flaring: 1. T/C train depressured ready for spin cooling inpreperation of maint. 2. Turbine compressor train depressured, for maintenance combustion inspection and PSV work. Friday, February 25, 2005 Page 1 of 1 REPORT NO: O5-0073 .~~:~~ BPXA FLARE REPORT PRUDHOE BAY FACILITY: CCP DATE: 06 Feb 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 18:50 18:55 OHrs 5Mins ^ ^ © 141 MSCF TOTAL VOLUME 141 MSCF First Determination of Cause: 1. Shut-Down T/C 1807 for maint. Action Taken to Stop Flaring: 1. Depressured system Friday, February 25, 2005 Page 1 of 1 REPORT NO: 05-0076 ~7'p ~~~.~.~,~ BPXA FLARE REPORT ~~ .~~ PRUDHOE BAY FACILITY: CCP DATE: 08 Feb 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 12:30 12:35 OHrs 5Mins ^ ^ © 135 MSCF TOTAL VOLUME 135 MSCF First Determination of Cause: 1. Shut Down T/C 1805 for maint. Action Taken to Stop Flaring: 1. Depressured System Friday, February 25, 2005 Page 1 of 1 REPORT NO: 05-0081 ~~ ~~~,~ BPXA FLARE REPORT .~ PRUDHOE BAY FACILITY: CCP DATE: 09 Feb 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Controlled Blowdow 13:20 13:25 OHrs Shins ^ ^ ® 156 MSCF 2. Controlled Blowdow 16:40 16:45 OHrs 5Mins ^ ^ © 80 MSCF TOTAL VOLUME 236 MSCF First Determination of Cause: 1. S/D 1809 for warter wash 2. !809 spin cool complete Action Taken to Stop Flaring: 1. Unit bled down 2. Unit bled down Friday, February 25, 2005 Page 1 of 1 REPORT NO: 05-0083 b}~ ,~ BPXA FLARE REPORT PRUDHOE BAY FACILITY: CCP DATE: 10 Feb 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Controlled Blowdow 22:20 22:25 OHrs 5Mins ^ ^ D 135 MSCF TOTAL VOLUME 135 MSCF First Determination of Cause: 1. S/D 1806 to spin cool for water wash Action Taken to Stop Flaring: 1. Unit depressured Friday, February 25, 2005 Page 1 of 1 REPORT NO: O5-OO$5 ~' BPXA FLARE REPORT .~.. _= ~. ~ PRUDHOE BAY FACILITY: CCP DATE: 11 Feb 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Controlled Blowdow 02:15 02:20 0 Hrs 5Mins ^ ^ © 8 MSCF 2. Controlled Blowdow 05:00 05:05 OHrs Shins ^ ^ © 8 MSCF 3. Controlled Blowdow 10:40 10:45 OHrs 5Mins ^ ^ ~ 77 MSCF 4. Controlled Blowdow 20:30 20:35 OHrs 5Mins ^ ^ Q 135 MSCF TOTAL VOLUME 228 MSCF First Determination of Cause: 1. T/C 1806 S/D after spin cool 2. T/C 1806 stopped after water wash 3. T/C 1809 depressured after pressure check following work on compressor 4. T/c 1808 S/D for spin cool & water wash Action Taken to Stop Flaring: 1. Unit depressured 2. Unit depressured 3. Unit depressured 4. unit depressured Friday, February 25, 2005 Page 1 of 1 REPORT NO: 05-0084 ,~~ BPXA FLARE REPORT PRUDHOE BAY FACILITY: CCP DATE: 11 Feb 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 08:40 08:45 OHrs 5Mins ^ ^^ 3 MSCF 2. Flare/Relief Valve 13:45.13:50 0 Hrs 5Mins ^ ^ ^~ 3 MSCF TOTAL VOLUME 6 MSCF First Determination of Cause: 1. T/C 1801 normal shutdown for speed control calibration. 2. T/C 1802 normal shutdown after bringing 1801 on line. Action Taken to Stop Flaring: 1. T/C normal shutdown depressuring. 2. T/C 1802 normal shutdown depressuring. Friday, February 25, 2005 Page 1 of 1 REPORT NO: O5-OO$6 ~'~ ~'~~~, BPXA FLARE REPORT ~~~; ~ PRUDHOE BAY FACILITY: CCP DATE: i 2 Feb 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Controlled Blowdow 02:25 02:30 OHrs Shins ^ ^ © 141 MSCF 2. Controlled Blowdow 05:30 05:35 OHrs Shins ^ ^ ^ 8 MSCF 3. Controlled Blowdow 05:55 06:00 OHrs 5Mins ^ ^ © 8 MSCF 4. Controlled Blowdow 09:10 09:15 OHrs Shins ^ ^ ~ 8 MSCF TOTAL V OLUME 165 MSCF First Determination of Cause: 1. !803 ESD'd in preperation for water wash 2. 1803 stopped for another attempt at water wash 3. 1803 water wash failed 4. 1803 water wash completed Action Taken to Stop Flaring: 1. Unit depressured 2. Unit depressured 3. Unit depressured 4. Unit depressured Friday, February 25, 2005 Page 1 of 1 ~. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition March-2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 434 480 2 Total Volume. 6. Sold , , Pool Name Pool Code Percent 234 544 886 PRUDHOE 640150 100.00% 7. Reinjected , , l 870 ess 8. Flared or vented 1 hour or 0 9. Flared or vented more than 1 hour (see instr.) 921 33 10. Pilot and Purge , if k 844 6 673 y in Remar 11. Used for lease operations (spec s) , , 0 Official Use Only 12. Other (see instructions) authorization >t hr: Safet MCF 4 88 001 y 13. TOTAL VOLUME (ITEMS 6-12) , 2 3,6 Lease Use MCF ~ 14. NGL Gas Equivalent Conservation MCF ~ 15. Purchased gas Waste: MCF 16. Transferred from: CGF & FS1 243,688,001 0 Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Block 11: Fuel Gas = 6,673,844 mscf and Assist Gas = 0 tnscf I hereby certify that the foregoing is true and ect to the best of my knowledge. Note: All volumes must be Signature Title Mana er, Production Taxes and Ro al corrected to pressure of 14.65 psia `/?rD~ and to a temperature of 60o F. Printed Name Bernard W. Ha'n Phone (907)564-5028 Date / th t AA 2 .2 Form 10-422 Rev. 1/2004 Submit in Duplicate ~- BP EXPLORATION (ALASKA) INC. Page 1 - PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT March 2005 Unplanned Events less than or equal to 1 hour :DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE` ACTION TAKEN TO ELIMINATE CAUSE 3/12/2005 1705-1710 156 Not required for unplanned events which Not required for unplanned events which 3/12/2005 1705-1710 159 are less than or equal to 1 hour are less than or equal to 1 hour 3/12/2005 1705-1710 135 3/12/2005 1740-1745 420 TOTAL 870 Unplanned Events greater than 1 hour ~, TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSE ~ ~ ACTION TAKEN T~~NATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO' ELIMINATE CAUSE See attachments..... See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME pESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE £AUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 870 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,921 Assist ~ 0 TOTAL FLARED VOLUME 34,791 4/7/2005 10:39 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition A ri1-2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of ld s s 643 496 3 Total Volume. . o , , Pool Name Pool Code Percent 721 211 850 PRUDHOE 640150 100.00% 7. Reinjected , , 691 4 8. Flared or vented 1 hour or less , i 0 nstr.) 9. Flared or vented more than 1 hour (see 32 819 10. Pilot and Purge , if i R 6 054 360 y n emarks) 11. Used for lease operations (spec , , h i O 0 Official Use Only 12. t er (see instruct ons) Authorization >1 hr: Safet MCF 221 586 087 y 13. TOTAL VOLUME (ITEMS 6-12) , , Lease Use MCF 4 GL l ~ . N ent 1 Gas Equiva Conservation MCF 0 15. Purchased gas Waste: MCF 16. Transferred from: CGF & FS1 .221,586,087 i # 0 Commissioner Date ve ) 17. Transferred to: (Express as a negat 1f3. Remarks: Block 11: Fuel Gas = 6,054,360 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Note: All volumes must be signature rifle Mana er, Production Taxes and Ro alt corrected to pressure of 14.65 psia (~' / [, ~ and to a temperature of 60o F. Printed Name Bernard W. Ha'n Phone (907)564-5028 Date J t v t7 ~ AUthOrit 2 AA 2 5. Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT April 2005 Unplanned Events less than ore ual to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 0 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/18/2005 0020-0025 135 See attachments See attachments 4/18/2005 0030-0335 156 4/18/2005 0330-0335 11 4/18/2005 0500-0505 8 4/18/2005 0945-0948 135 4/18/2005 1230-1233 8 4/18/2005 1440-1443 8 4/18/2005 1915-1920 135 4/18/2005 2230-2235 8 4/18/2005 2300-2305 8 4/19/2005 0130-0133 11 4/19/2005 0305-0310 156 4/19/2005 0555-0558 77 4/19/2005 1325-1330 32 4/19/2005 1600-1605 156 4/19/2005 2025-2029 93 4/20/2005 0435-0438 8 4/20/2005 0550-0555 135 4/20/2005 0910-0915 14 4/20/2005 1530-1535 135 4/20/2005 2115-2120 8 4/20/2005 2250-2255 141 4/20/2005 2320-2325 91 4/20/2005 2330-2335 91 4/21 /2005 0120-0125 32 4/21 /2005 0330-0335 156 4/21 /2005 0650-0655 14 5isi2oo5 8:57 AM 4/21 /2005 0700-0705 11 BP EXPLORATION (ALASKA) INC. Page 2 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT April 2005 4/21 /2005 1300-1305 135 4/21 /2005 1905-1910 14 4/22/2005 0105-0110 8 4/22/2005 0235-0240 135 4/22/2005 0430-0435 8 4/22/2005 0530-0553 8 4/22/2005 0745-0750 14 4/22/2005 2050-2055 8 4/22/2005 2350-2355 77 4/23/2005 0130-0135 8 4/23/2005 0340-0350 408 4/23/2005 0715-0720 152 4/26/2005 0405-0410 109 4/26/2005 0505-0510 109 4/26/2005 0535-0540 109 4/26/2005 0855-0900 109 4/26/2005 1120-1125 43 4/26!2005 1300-1305 109 4/26/2005 1700-1705 408 4/26/2005 1850-1855 109 4/26/2005 2100-2105 420 4/27/2005 0140-0145 109 4/27/2005 0330-0335 109 TOTAL 4,691 Planned Events Exceeding 1 Hour OR Exceedin 5000 Mcf DATE TIME' VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 4,691 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 32,819 Assist U 5/9/2005 TOTAL FLARED VOLUME 37,510 8:57 AM REPORT NO: 05-0209 b ~~,~ BPXA FLARE REPORT ~- .~ ~~= PRUDHOE BAY FACILITY: CCP DATE: 18 Apr 2005 TIME OF FL ARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Controlled Blowdow 00:20 00:25 0 Hrs Shins ^ ^ © 135 MSCF 2. Flare/Relief Valve 00:30 00:35 0 Hrs Shins ^ ^ © 156 MSCF 3. Flare/Relief Valve 03:30 03:35 OHrs 5Mins ^ ^ © 11 MSCF 4. Flare/Relief Valve 05:00 05:05 OHrs 5Mins ^ ^ © 8 MSCF 5. Flare/Relief Valve 09:45 09:48 0 Hrs 3Mins ^ ^ © 135 MSCF 6. Flare/Relief Valve 12:30 12:33 0 Hrs 3Mins ^ ^ © 8 MSCF 7. Flare/Relief Valve 14:40 14:43 0 Hrs 3Mins ^ ^ © 8 MSCF 8. Flare/Relief Valve 19:15 19:20 OHrs 5Mins ^ ^ © 135 MSCF 9. Flare/Relief Valve 22:30 22:35 OHrs Shins ^ ^ d^ 8 MSCF 10. Flare/Relief Valve 23:00 23:05 0 Hrs Shins ^ ^ ^~ 8 MSCF TOTAL VOLUME 612 MSCF First Determination of Cause: 1. Shutdown TIC 1807 for water wash 2. Shutdown T/C 1809 for water water 3. Shutdown T/C 1809 after spin cool. 4. Shutdown T/C 1807 after spin cool. 5. Shutdown T/C 1801 to put on spin cool. 6. Shutdown T/C 1801 for maint. 7. Shutdown TIC 1807 after waterwash. 8. T/C 1802 shutdown for maint. 9. T/C 1801 shutdown after water wash 10. T/C 1802 stopped after spincool Tuesday, May 03, 2005 Page 1 of 2 REPORT NO: OrJ-0209 ,~ ....;~ ~~~~~ BPXA FLARE REPORT ,~ ~~:;,,~ PRUDHOE BAY FACILITY: CCP DATE: 18 Apr 2005 Action Taken to Stop Flaring: 1. Unit depressured 2. Unit depressured 3. Unit depressured. 4. Unit depressured 5. Unit depressured 6. Depressured unit. 7. Depressured unit. 8. Depressured T/C 1802 9. Depressured T/C 1801 10. Depressured T/C 1802 Tuesday, May 03, 2005 Page 2 of 2 REPORT NO: 05-0213 ~~ 4. _ "~~ ~~~~ BPXA FLARE REPORT ~~~~~ PRUDHOE BAY FACILITY: CCP DATE: 19 Apr 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:30 01:33 OHrs 3Mins ^ ^ ^d 11 MSCF 2. Flare/Relief Valve 03:05 03:10 OHrs 5Mins ^ ^ © 156 MSCF 3. Flare/Relief Valve 05:55 05:58 OHrs 3Mins ^ ^ © 77 MSCF 4. Flare/Relief Valve 13:25 13:30 OHrs 5Mins ^ ^ © 32 MSCF 5. Flare/Relief Valve 16:00 16:05 OHrs 5Mins ^ ^ ~ 156 MSCF 6. Flare/Relief Valve 20:25 20:29 OHrs 4Mins ^ ^ ~ 93 MSCF TOTAL VOLUME 525 MSCF First Determination of Cause: 1. T/C 1809 stopped after water wash. 2. T/C 1810 stopped for spin cool. 3. T/C 1810 stopped after spin cool. 4. T/C 1810 stopped after water wash 5. T/C 1811 stopped for spin cool. 6. T/c 1811 ESD'd after spin cool. Action Taken to Stop Flaring: 1. Unit depressured 2. Unit depressured 3. Unit depressured. 4. Unit depressured. 5. Unit depressured. 6. Unit depressured. Friday, April 22, 2005 Page 1 of 1 REPORT NO: 05-0212 ~~ .~~!~.~ BPXA FLARE REPORT PRUDHOE BAY FACILITY: CCP DATE: 20 Apr 2005 TIME OF FL ARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 04:35 04:38 0 Hrs 3Mins ^ ^ ~ 8 MSCF 2. Flare/Relief Valve 05:50 05:55 OHrs 5Mins ^ ^ 0 135 MSCF 3. Flare/Relief Valve 09:10 09:15 0 Hrs 5Mins ^ ^ © 14 MSCF 4. Flare/Relief Valve 15:30 15:35 OHrs Shins ^ ^ ~ 135 MSCF 5. Flare/Relief Valve 21:15 21:20 OHrs 5Mins ^ ^ ~ 8 MSCF 6. Flare/Relief Valve 22:50 22:55 OHrs Shins ^ ^ ~ 141 MSCF 7. FlarelRelief Valve 23:20 23:25 OHrs Shins ^ ^ © 91 MSCF 8. Flare/Relief Valve 23:30 23:35 OHrs 5Mins ^ ^ ~ 91 MSCF TOTAL V OLUME 623 MSCF First Determination of Cause: 1. T/C 1802 stopped after water wash. 2. T/C 1804 stopped for spin cool. 3. T/C 1804 ESD after spincool 4. T/C 1805 Normal stop for maintenance 5. T/C 1805 shutdown after water wash 6. T/C 1808 ESD from MCR for maintenance/water wash 7. T/C 1811 -tubing leak on pilot of P55D relief valve 8. T/C 1811 depressured after pressure test Action Taken to Stop Flaring: 1. Unit depressured. 2. Unit depressured. Tuesday, May 03, 2005 Page 1 of 2 ~_~ ,~ ~~~Q~ BPXA FLARE REPORT -~~ PRUDHOE BAY FACILITY: CCP DATE: 20 Apr 2005 ~j ~/C 1804 depressured ~ T/C 1805 depressured / ~2. UC 1805 depressured J,~T/C 1808 depressured ~T/C 1811 depressured 1~T/C 1811 depressured REPORT NO 05-0212 Tuesday, May 03, 2005 Page 2 of 2 REPORT NO: 05-0218 ~r~ ,~'~~ BPXA FLARE REPORT ~~~,~ PRUDHOE BAY FACILITY: CCP DATE: 21 Apr 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:20 01:25 OHrs Shins ^ ^ ~ 32 MSCF 2. Flare/Relief Valve 03:30 03:35 0 Hrs 5Mins ^ ^ ® 156 MSCF 3. Flare/Relief Valve 06:50 06:55 OHrs Shins ^ ^ © 14 MSCF 4. Flare/Relief Valve 07:00 07:05 OHrs 5Mins ^ ^ ~ 11 MSCF 5. Flare/Relief Valve 13:00 13:05 OHrs Shins ^ ^ ~ 135 MSCF 6. Flare/Relief Valve 19:05 19:10 0 Hrs 5Mins ^ ^ ® 14 MSCF TOTAL VOLUME 362 MSCF First Determination of Cause: 1. T/C 1811 shutdown after water wash 2. T/C 1812 shutdown for 2nd stage bucket change/water wash 3. T/C 1808 spin cool complete / ESD from LCR 4. T/C 1812 spin cool complete /ESD from MCR 5. T/C 1813 shutdown for maintenance and water wash 6. T/C 1813 off spin cool / ESD'ed Action Taken to Stop Flaring: 1. T/C 1811 depressured 2. T/C 1812 depressured 3. T/C 1808 depressured 4. T/C 1812 depressured 5. T/C 1813 depressured 6. T/C 1813 depressured Tuesday, May 03, 2005 Page 1 of 1 REPORT NO: 05-0219 ~:7~~ ~~~~~ BPXA FLARE REPORT ~~~; PRUDHOE BAY FACILITY: CCP DATE: 22 Apr 2005 TIME OF FLARING Black SYSTEM Start Stop Duratio n Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:05 01:10 OHrs Shins ^ ^ ~ 8 MSCF 2. Flare/Relief Valve 02:35 02:40 OHrs Shins ^ ^ 0 135 MSCF 3. FlareJRelief Valve 04:30 04:35 OHrs 5Mins ^ ^ © 8 MSCF 4. Flare/Relief Valve 05:30 053 ~HrS 23Mins ^ ^ © 8 MSCF 5. Flare/Relief Valve 07:45 07:50 OHrs 5Mins ^ ^ © 14 MSCF 6. Flare/Relief Valve 20:50 20:55 OHrs 5Mins ^ ^ © 8 MSCF 7. Flare/Relief Valve 23:50 23:55 OHrs 5Mins ^ ^ © 77 MSCF TOTAL V OLUME 258 MSCF First Determination of Cause: 1. T/C 1813 shutdown -water wash complete 2. T/C 1803 shutdown for maintenance and water wash 3. T/C 1803 normal stop from fast ratchet 4. T/C 1803 shut down from fast ratchet 5. T/C 1803 shutdown from spin cool / ESD'ed from LCR 6. TIC 1803 from water wash 7. TIC 1812 depressured from pressure test after maintenance Action Taken to Stop Flaring: 1. T/C 1813 depressured 2. T/C 1803 depressured 3. T/C 1803 depressured 4. T/C 1803 depressured Tuesday, April 26, 2005 Page 1 of 2 ~~~ BPXA FLARE REPORT PRUDHOE BAY ~~~~ FACILITY: CCP DATE: 22 Apr 2005 ~T/C 1803 depressured b ~ T/C 1803 depressured --1 J~1~T/C 1812 depressured REPORT NO: 05-0219 Tuesday, April 26, 2005 Page 2 of 2 ~~ ~~}~~#~, BPXA FLARE REPORT .~ ~. ~~~,3 PRUDHOE BAY REPORT NO: 05-0220 FACILITY: CCP DATE: 23 Apr 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:30 01:35 0 Hrs Shins ^ ^ ~ 8 MSCF 2. Flare/Relief Valve 03:40 03:50 OHrs 10Mins ^ ^ © 408 MSCF 3. Flare/Relief Valve 07:15 07:20 0 Hrs 5Mins ^ ^ © 152 MSCF TOTAL VOLUME 568 MSCF First Determination of Cause: 1. T/C 1812 shutdown after water wash 2. T/C 1878 shutdown for maintenance 3. T/C 1878 spin cool complete / ESD'ed from LCR Action Taken to Stop Flaring: 1. T/C 1812 depressured 2. TIC 1878 depressured 3. T/C 1878 depressured Tuesday, April 26, 2005 Page 1 of 1 REPORT NO: 05-O2Z5 ~~~4~3~ BPXA FLARE REPORT ~r ~~ ~~~ ~` PRUDHOE BAY FACILITY: CCP DATE: 26 Apr 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 04:05 04:10 OHrs 5Mins ^ ^ © 109 MSCF 2. Flare/Relief Valve 05:05 05:10 OHrs 5Mins ^ ^ ~ 109 MSCF 3. Flare/Relief Valve 05:35 05:40 OHrs 5Mins ^ ^ Q 109 MSCF 4. Flare/Relief Valve 08:55 09:00 OHrs 5Mins ^ ^ ~ 109 MSCF 5. Flare/Relief Valve 11:20 11:25 OHrs 5Mins ^ ^ ~ 43 MSCF 6. Flare/Relief Valve 13:00 13:05 OHrs 5Mins ^ ^ © 109 MSCF 7. Flare/Relief Valve 17:00 17:05 0 Hrs 5Mins ^ ^ ~ 408 MSCF 8. Flare/Relief Valve 18:50 18:55 OHrs 5Mins ^ ^ © 109 MSCF 9. Flare/Relief Valve 21:00 21:05 OHrs 5Mins ^ ^ ~ 420 MSCF TOTAL V OLUME 1,525 MSCF First Determination of Cause: 1. T/C 1878 water wash complete. 2. T/C 1878 tripped during start up due to high vibration 3. T/C 1878 tripped during start up due to high vibration 4. T/C 1878 tripped during start up due to high vibration 5. T/C 1878 tripped during start up - type C S/D 6. T/C 1878 tripped during start up 7. T/C 1878 S/D to change LP shaft speed probe 8. T/C 1878 S/D -spin cool complete 9. T/C 1876 S/D (ESD'd from LCR) for maintenance and water wash. Monday, May 02, 2005 Page 1 of 2 REPORT NO: 05-0225 ~~r~ ,~~~~~~ BPXA FLARE REPORT ,~ ~,..-= PRUDHOE BAY ~~y ~z FACIUTV: CCP SATE: 26 Apr 2005 Action Taken to Stop Flaring: 1. T/C 1878 depressured 2. T/C 1878 depressured 3. TIC 1878 depressured 4. T/C 1878 depressured 5. T/C 1878 depressured 6. T/C 1878 depressured 7. T/C 1878 depressured 8. T/C 1878 depressured 9. T/C 1876 depressured Monday, May 02, 2005 Page 2 of 2 REPORT NO: 05-0227 ~e °~~~ BPXA FLARE REPORT .. ~~~~~~ PRUDHOE BAY FACILITY: CCP DATE: 27 Apr 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:40 01:45 OHrs 5Mins ^ ^ © 109 MSCF 2. Flare/Relief Valve 03:30 03:35 OHrs 5Mins ^ ^ © 109 MSCF TOTAL VOLUME 218 MSCF First Determination of Cause: 1. T/C 1878 depressured for water wash 2. Water wash complete Action Taken to Stop Flaring: 1. depressured T/C 2. T/C depressured Monday, May 02, 2005 Page 1 of 1 ~.. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition Ma -2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 861 240 3 Total Volume. 6. Sold , , Pool Name Pool Code Percent 214 240 702 PRUDHOE 640150 100.00% 7. Reinjected , , 1 0 8. Flared or vented 1 hour or less 8 i 0 nstr.) 9. Flared or vented more than 1 hour (see 28 954 10. Pilot and Purge , 6 29 01 11. Used for lease operations (specify in Remarks) , 5, 7 ,, ', ; µ' '' . -0fficiaL Use Only,. :: ` 12. Other (see instructions) 0 authorization >1 hr: Safet MCF y 13. TOTAL VOLUME (ITEMS B-12) 224,426,093 Lease Use MCF 0 14. NGL Gas Equivalent Conservation MCF 0 15. Purchased gas Waste: MCF 16. Transferred from: CGF & FSt 224,426,093 0 Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Block 11: Fuel Gas = 6,295,017 mscf and Assis[ Gas = 0 mscf I hereby certify that t foregoing is true nd ect to the best of my knowledge. Note: All volumes must be signature .Title Manager, Production Taxes and Ro alt corrected to pressure of 14.65 psis ~ and to a temperature of 60o F. Printed Name Bernard W. Ha'n Phone (907)564-5028 Date Auth rit 2 AA 2 .2 Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT May 2005 Unplanned Events less than or equal to 1 hour ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 0 Unplanned Events greater than 1 hour ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT &' CAUSE ACTION TAKEN TO ELIMINATE: CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~ ^ww. ^wr~ ~~ w,~w~wr~i i i i iii i i i i iii i iii i i iwi DATE TIME VOLUME ! DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE: CAUSE 5/25/2005 0001-0006 135 See attachments See attachments 5/25/2005 0300-0305 45 TOTAL 180 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE` ACTION TAKEN TO ELIMINATE CAUSE' See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 180 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 28,954 Assist ~ TOTAL FLARED VOLUME 29,134 6/6/2005 10:44 AM ~~J ~~~~ BPXA FLARE REPORT ,~~~~ PRUDHOE BAY REPORT NO: 05-0274 FACILITY: CCP DATE: 25 May 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:01 00:06 OHrs Shins ^ ^ © 135 MSCF 2. FlarelRelief Valve 03:00 03:05 0 Hrs 5Mins ^ ^ ~ 45 MSCF TOTAL VOLUME 180 MSCF First Determination of Cause: 1. T/C 1806 S/D for planned maintenance 2. T/C 1806 S/D from spincooling Action Taken to Stop Flaring: 1. T/C 1806 depressured 2. T/C 1806 depressured Friday, May 27, 2005 Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition June-2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 207 713 3 Total Volume. s. Sold , , Pool Name Pool Code Percent 1 9 0 888 PRUDHOE 640150 100.00% 7. Reinjected , 86, 8 2 501 8. Flared or vented 1 hour or less , i 0 nstr.) 9. Flared or vented more than 1 hour (see 32 661 10. Pilot and Purge , k i if i R 5 598 077 emar 11. Used for lease operat ons (spec y n s) , , i i 0 Official Use Only nstruct ons) 12. Other (see Authorization >1 hr: S f t MCF S 821 840 195 a e y 13. TOTAL VOLUME (ITEM 6-12) , , L U MCF NGL G E i l t ~ ease se qu va en 14. as C ti MCF d ~ onserva on 15. Purchase gas Waste: MCF 16. Transferred from: CGF & FS1 195,821,840 E i # f 0 Commissioner Date xpress as a negat ve ) 17. Trans erred to: ( 1 s. Remarks: Block 11: Fuel Gas = 5,598,077 mscf and Assist Gas = 0 mscf I hereby certify that the f regoing is true a d correct to the best of my knowledge. Note: All volumes must be Signature Title Mana er, Production Taxes and Ro al corrected to pressure of 14.65 psis and to a temperature of 60o F. Printed Name Bernard W. Ha'n Phone (907 564-5028 Date -dS Tit 2 AA 2 .2 Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT June 2005 Un lanned Events less than or equal to 1 hour DATE TIME- - VOLUME -0ESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/13!2005 0650-0700 156 Not required for unplanned events which Not required for unplanned events which 6/14/2005 1035-1045 408 are less than or equal to 1 hour are less than or equal to 1 hour 6/14/2005 1135-1145 109 6/18/2005 0615-0625 408 6/19/2005 1200-1210 135 6/ 19/2005 1245-1255 135 6/ 19/2005 1845-1855 109 6/28/2005 1710-1715 135 6/30/2005 0135-0145 420 TOTAL 2,015 Un lanned Events rester than 1 hour DATE TIME. '' VOLUME DESCRIPTION OFiNCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE. See attachments....... See attachments TOTAL 0 Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf DATE TIME VOLUME -0ESCRIPTION OF'1NCIDENT &.CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6!5/2005 1445-1447 45 See attachments See attachments 6/5/2005 1500-1502 8 6/5/2005 1620-1625 135 6/6/2005 1415-1420 135 6/19/2005 0130-0140 135 6/19/2005 0345-0355 14 6/19/2005 0515-0525 14 TOTAL 486 Planned Events Exceedin 1 Hour OR Exceeding 5000 Mcf DATE: TIME VOLUME ' DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE: See attachments See attachments TOTAL TOTAL Unplanned Events < 1 Hour 2,015 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 486 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 32,661 Assist 0 TOTAL FLARED VOLUME 35,162 ~~ Page 1 7/11/2005 2:06 PM REPORT NO: 05-0295 a BPXA FLARE REPORT ~'~~'~~~~F~~ PRUDHOE BAY FACILITY: CCP DATE: 05 Jun 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 14:45 14:47 0 Hrs 2 Mins ^ ^ 0 45 MSCF 2. Flare/Relief Valve 15:00 15:02 0 Hrs 2Mins ^ ^ © 8 MSCF 3. Flare/Relief Valve 16:20 16:25 0 Hrs SMins ^ ^ 0 135 MSCF TOTAL VOLUME 188 MSCF First Determination of Cause: 1. T/C 1806 Depressured after leak test 2. T/C 1806 Tripped on startup 3. T/C 1806 S/D for planned maintenance Action Taken to Stop Flaring: 1. T/C 1806 Depressured 2. T/C 1806 depressured 3. T/C 1806 Depressured Wednesday, June 29, 2005 Page 1 of 1 REPORT NO: 05-0294 b~ BPXA FLARE REPORT ~~::. ~~~~~~~~~~~` PRUDHOE BAY FACILITY: CCP DATE: 06 Jun 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 14:15 14:20 0 Hrs SMins ^ ^ 0 135 MSCF TOTAL VOLUME 135 MSCF First Determination of Cause: 1. T/C 1806 S/D for Planned Maintenance Action Taken to Stop Flaring: 1. T/C 1806 Depressured Wednesday, June 29, 2005 Page 1 of 1 REPORT NO: 05-0353 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CCP DATE: 19 Jun 2005 TIME OF FL ARING Black SYSTEM Start Stop Duratio n Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:30 01:40 OHrs 10Mins ^ ^ Q 135 MSCF 2. Flare/Relief Valve 03:45 03:55 0 Hrs 10Mins ^ ^ © 14 MSCF 3. Flare/Relief Valve 05:15 05:25 0 Hrs 10Mins ^ ^ ® 14 MSCF 4. Flare/Relief Valve 12:00 12:10 0 Hrs 10Mins ^ ^ ^ 135 MSCF 5. Flare/Relief Valve 12:45 12:55 0 Hrs 10Mins ^ ^ ^ 135 MSCF 6. Flare/Relief Valve 18:45 18:55 0 Hrs 10Mins ^ ^ ^ 109 MSCF TOTAL VOLUME 542 MSCF First Determination of Cause: 1. T/C 1813 SD for spin cool 2. T/C 1805 SD for spin cool 3. T/C 1813 SD after spin cool 4. T/C 1802 SD due to a bire wire 5. T/C 1805 SD due to F33AV going closed 6. T/C 1876 SD due to Computer problem Action Taken to Stop Flaring: 1. T/C 1813 depressured 2. T/C 1805 depressured 3. TIC 1813 depressured 4. T/C 1802 depressured 5. T/C 1805 depressured 6. T/C 1876 depressured Tuesday, July 05, 2005 Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. MonthNear of Disposition Jul -2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Sold 6 3 488 219 Total Volume. . , , Pool Name Pool Code Percent 7 Reinjected 181 867 294 PRUDHOE 640150 100.00% . , , 8 Flared or vented 1 hour or less 1 575 . , 9 Flared or vented more than 1 hour (see instr ) Q . . 10 Pilot and Purge 33 745 . , 11 Used for lease operations (specify in Remarks) 5 693 468 . , , 12 Other (see instructions) U ;;Official:Use Only,.; ;; - •, _ . Authorization >1 hr MCF 13. TOTAL VOLUME (ITEMS 6-12) 191 084 301 Safety , , MCF 14. NGL Gas Equivalent Q Lease Use MCF 15 Purchased gas Q Conservation . Waste: MCF 16. Transferred from: CGF & FS1 191,084,301 17 Transferred to: (Express as a negative #) 0 Commissioner Date . 18. Remarks: Block 11: Fuel Gas = 5,693,468 mscf and Assist Gas = 0 tnscf I hereby certify that the foregoing is true nd co to the best of my knowledge. Note: All volumes must be signature Title Mana er, Production Taxes and Ro alt corrected to pressure of 14.65 psla ~l and to a temperature of 60o F. Printed Name Bernard W. Ha'n Phone 907)564-5028 Date ~J ^ ~ Q~ A t r' 2 2 .2 Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT July 2005 Un lanned Events less than ore ual to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/27/2005 0025-0030 109 Not required for unplanned events which Not required for unplanned events which 7/27/2005 0055-0100 109 are less than or equal to 1 hour are less than or equal to 1 hour 7/27/2005 0150-0155 109 7/27/2005 0255-0300 109 7/27/2005 1930-1935 109 7/29/2005 0005-0010 135 7/29/2005 0030-0035 135 7/30/2005 0030-0035 11 TOTAL 826 Un lanned Events realer than 1 hour DATE TIME VOLUME DESCRIPTIONAF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or E ual 1 Hour AND Not Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO"ELIMINATE CAUSE 7/21/2005 2200-2205 156 See attachments See attachments 7/21/2005 2354-2359 35 7/23/2005 0925-0935 141 7/28/2005 1305-1310 91 7/28/2005 1440-1445 156 7/28/2005 1725-1730 11 7/29/2005 0735-0740 135 7/29/2005 0940-0945 8 7/29/2005 1100-1105 8 7/29/2005 1235-1240 8 TOTAL 749 Planned Events Exceedin 1 Hour OR Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKENTO ELIMINATE CAUSE See attachments See attachments TOTAL TOTAL Unplanned Events < 1 Hour 826 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 749 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,7a5 Assist 0 TOTAL FLARED VOLUME 35,320 Page 1 8/5/2005 1:31 PM REPORT NO: 05-0374 BPXA FLARE REPORT ., ~~~~~~~~~ PRU DHOE BAY FACILITY: CCP DATE: 21 JUI 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 22:00 22:05 0 Hrs 5Mins ^ ^ © 156 MSCF 2. Flare/Relief Valve 23:54 23:59 OHrs 5Mins ^ ^ 0 35 MSCF TOTAL VOLUME 191 MSCF First Determination of Cause: 1. Shut-Down T/C 1810 for Maint 2. Spin-Cool T/C 1810 and shut down for maint. Action Taken to Stop Flaring: 1. Depressured Gas Train 2. T/C depressured Monday, July 25, 2005 Page 1 of 1 REPORT NO: 05-0383 BPXA FLARE REPORT ~~:;.. .:~.. '~~~~~~~~~~~ PRUDHOE BAY FACILITY: CCP DATE: 23 JUI 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 09:25 09:35 0 Hrs 10Mins ^ ^ 0 141 MSCF TOTAL VOLUME 141 MSCF First Determination of Cause: 1. TC 1807 shut down for maintenance. Action Taken to Stop Flaring: 1. Completed depressuring. Monday, July 25, 2005 Page 1 of 1 REPORT NO: 05-0402 BPXA FLARE REPORT ::: ~~~~ ~~" PRUDHOE BAY FACILITY: CCP DATE: 28 JUI 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 13:05 13:10 0 Hrs 5Mins ^ ^ Q 91 MSCF 2. Flare/Relief Valve 14:40 14:45 0 Hrs 5Mins ^ ^ Q 156 MSCF 3. Flare/Relief Valve 17:25 17:30 0 Hrs 5Mins ^ ^ ® 11 MSCF TOTAL V OLUME 258 MSCF First Determination of Cause: 1. t/c 1810 check valve repair. 2. t/c 1809 t-shell pull and bucket inspection. 3. T/C 1809 SPINCOOL COMPLETE..EIL FOR T-SHELL AND BUCKET INSPECTION Action Taken to Stop Flaring: 1. 2. 3. Monday, August 01, 2005 Page 1 of 1 BPXA FLARE REPORT '~~~~~~~~~~`` ~ PRUDHOE BAY REPORT NO: 05-0405 FACILITY: CCP DATE: 29.1U1 2005 TIME OF FL ARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve .00:05 00:10 0 Hrs 5Mins ^ ^ ^ 135 MSCF 2. Flare/Relief Valve 00:30 00:35 0 Hrs 5Mins ^ ^ ^ 135 MSCF 3. Flare/Relief Valve 07:35 07:40 0 Hrs SMins ^ ^ © 135 MSCF 4. Flare/Relief Valve 09:40 09:45 0 Hrs 5Mins ^ ^ © 8 MSCF 5. Flare/Relief Valve 11:00 11:05 0 Hrs SMins ^ ^ 0 8 MSCF 6. Flare/Relief Valve 12:35 12:40 0 Hrs SMins ^ ^ © 8 MSCF TOTAL VOLUME 429 MSCF First Determination of Cause: 1. T/C 1808 shutdown for water wash 2. T/C 1807 shutdown for water wash 3. T/C 1802 SHUTDOWN FOR WATER WASH 4. T/C 1807 SHUTDOWN SPINCOOL COMPLETE 5. T/C 1802 SHUTDOWN SPINCOOL COMPLETE 6. T/C 1802 SHUTDOWN WATER WASH COMPLETE Action Taken to Stop Flaring: 1. system depressured 2. system depressured 3. SYSTEM DEPRESSURED 4. SYSTEM DEPRESSURED S. SYSTEM DEPRESSURED 6. SYSTEM DEPRESSURED Monday, August 01, 2005 Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition Au ust-2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 447 564 3 Total Volume. 6. Sold , , pool Name Pool Code Percent 192 294 805 PRUDHOE 640150 100.00% 7. Reinjected , , 8. Flared or vented 1 hour or less 135 9. Flared or vented more than 1 hour (see instr.) 0 745 33 10. Pilot and Purge , 4 2 11. Used for lease operations (specify in Remarks) 5,6 9,50 0 `, , f ;.Official Use Only,, + 12. Other (see instructions) Authorization >1 hr: Safet MCF 751 2 1 425 y 13. TOTAL VOLUME (ITEMS 6-12) , , 0 L U MCF 0 ease se 14. NGL Gas Equivalent Conservation MCF 15. Purchased gas ~ Waste: MCF 16. Transferred from: CGF & FS1 201,425,751 # i 0 Commissioner Date ) 17. Transferred to: (Express as a negat ve 18. Remarks: Block 11: Fuej Gas = 5,649,502 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is tr a and tb ct to the best of my knowledge. Note: All volumes must be Signature Title Mana er, Production Taxes and Ro al corrected to pressure of 14.65 psia !~ and to a temperature of 60o F. Printed Name Bernard W. Ha'n Phone (907)564-5028 Date l rv ~ A th rit 2 2 .2 Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT August 2005 Unplanned Events less than or equal to 1 hour ~ ~~~ DATE TIME VOLUME!' DESCRIPTION' OF tNCIDENT & CAUSE " ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 0 Unplanned Events greater than 1 hour DATE :TIME VOLUME' DESCRIPTION OFJNCIDENT & CAUSE ' !' ACTION TAKEN TOIEUMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION"OF INCIDENT & CAUSE ' ACTION TAKEN TO'ELIMINATE CAUSE 8/19/2005 0545-0600 135 See attachments See attachments TOTAL 135 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE 'TIME VOLUME' DESCRIPTION OF' INCIDENT & CAUSE ' ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 135 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,745 Assist 0 TOTAL FLARED VOLUME 33,880 9/9/2005 11:24 AM REPORT NO: 05-0463 y~~~ .:~`~: BPXA FLARE REPORT ~~'~~~~ PRU DHOE BAY FACILITY: CCP DATE: 19 Aug 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 05:45 06:00 OHrs 15Mins ^ ^ © 135 MSCF TOTAL VOLUME 135 MSCF First Determination of Cause: 1. T/C 1804 S/D for water wash Action Taken to Stop Flaring: 1. Depressured Monday, August 29, 2005 Page 1 of 1 .h STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition Se tember-2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 3 1 0 1 3 Total Volume. 6. Sold , 7 , 9 pool Name Pool Code Percent 194 80 151 PRUDHOE 640150 100.00% 7. Reinjected ,9 , 2 1 9 8. Flared or vented 1 hour or less , 5 0 9. Flared or vented more than 1 hour (see instr.) 32 661 to. Pilot and Purge , 519 871 5 11. Used for lease operations (specify in Remarks) , , 0 Otfic!al Use Onl, 12. Other (see instructions) Authorization >1 hr: Safet Mc;r 203 705 035 y 13. TOTAL VOLUME (ITEMS 6-12) , , Lease Use MCF 0 14. NGL Gas Equivalent Conservation MCF 0 15. Purchased gas Waste: MCF 16. Transferred from: CGF & FSt 203,705,035 x Commissioner Date press as a negative #) 17. Transferred to: (E 0 1 e. Remarks: Block 11: Fuel Gas = 5,519,871 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is true and corr ct to the best of my knowledge. Note: All volumes must be Signature Title Mana er, Production Taxes and Ro alt corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Bernard W. Ha'n Phone (907)564-5028 Date '~0 A th rit 20 AAC25.23 Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT September 2005 Unplanned Events less than or equal to 1 hour ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION 7AKENTO ELIMINATE CAUSE 9/6/2005 2015-2020 135 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 135 Unplanned Events greater than 1 hour .DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~ DATE TIME vOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/5/2005 0350-0355 408 See attachments See attachments 9/5/2005 0800-0805 152 9/5/2005 1925-1935 109 9/5/2005 2100-2110 109 9/29/2005 0215-0225 135 9/29/2005 0250-0300 156 9/29/2005 0330-0335 8 9/29/2005 0545-0550 14 9/29/2005 0715-0720 11 9/29/2005 1600-1610 156 9/29/2005 1710-1720 135 9/29/2005 1930-1935 14 9/29/2005 2105-2110 32 9/30/2005 0335-0340 32 9/30/2005 0400-0405 32 9/30/2005 0507-0522 156 9/30/2005 0750-0755 14 9/30/2005 1030-1035 11 9/30/2005 1715-1730 156 9/30/2005 1915-1930 135 9/30/2005 2130-2135 35 9/30/2005 2250-2255 14 TOTAL 2,024 Page 1 10/10/2005 9:55 AM BP EXPLORATION (ALASKA) INC. Page 2 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT September 2005 tanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN. TO ELIMINATE.CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 135 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 2,024 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 32,661 Assist 0 TOTAL FLARED VOLUME 34,820 10/10/2005 9:55 AM €~~~ >v.:~; _:.~' BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 05-0484 FACILITY: CCP DATE: 05 Sep 2005 TIME OF FLARING Black SYSTEM Start Stop Duratio n Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 03:50 03:55 OHrs SMins ^ ^ © 408 MSCF 2. Flare/Relief Valve 08:00 08:05 OHrs SMins ^ ^ © 152 MSCF 3. Flare/Relief Valve 19:25 19:35 OHrs 10Mins ^ ^ 0 109 MSCF 4. Flare/Relief Valve 21:00 21:10 O Hrs 10Mins ^ ^ 0 109 MSCF TOTAL VOLUME 778 MSCF First Determination of Cause: 1. TC 1878 shut down for water wash. 2. 7C 1878 shut down from spin cooling for water wash. 3. TC 1878 water wash complete 4. TC 1878 shut down on high vibration Action Taken to Stop Flaring: 1. Depressured unit. 2. Depressured unit. 3. Depressured unit. 4. Depressured unit. Tuesday, October 04, 2005 Page 1 of 1 REPORT NO: 05-0514 y BPXA FLARE REPORT ~:::~ PRUDHOE BAY FACILITY: CCP DATE: 29 Sep 2005 TIME OF FL ARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 02:15 02:25 0 Hrs 10Mins ^ ^ 0 135 MSCF 2. Flare/Relief Valve 02:50 03:00 0 Hrs 10Mins ^ ^ 0 156 MSCF 3. Flare/Relief Valve 03:30 03:35 OHrs 5Mins ^ ^ ® 8 MSCF 4. Flare/Relief Valve 05:45 05:50 OHrs 5Mins ^ ^ 0 14 MSCF 5. Flare/Relief Valve 07:15 07:20 OHrs SMins ^ ^ 0 11 MSCF 6. Flare/Relief Valve 16:00 16:10 OHrs 10Mins ^ ^ 0 156 MSCF 7. Flare/Relief Valve 17:10 17:20 0 Hrs 10Mins ^ ^ © 135 MSCF 8. Flare/Relief Valve 19:30 19:35 OHrs 5Mins ^ ^ p 14 MSCF 9. Flare/Relief Valve 21:05 21:10 OHrs 5Mins ^ ^ p 32 MSCF TOTAL V OLUME 661 MSCF First Determination of Cause: 1. TC 1808 shut down for water wash 2. TC 1812 shut down for water wash 3. TC 1808 shut down off spin cool 4. TC 1808 esd'd off spin cool 5. TC 1812 esd'd from spin cool 6. TC 1810 shut down for water wash 7. TC 1813 shut down for water wash 8. TC 1813 esd'd off spin cool 9. TC 1810 stop from spin cool Monday, October 03, 2005 Page 1 of 2 REPORT NO: 05-0514 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CCP DATE: 29 Sep 2005 Action Taken to Stop Flaring: 1. Depressured unit 2. Depressured unit 3. Depressured unit 4. Depressured unit 5. Depressured unit 6. Depressured unit 7. Depressured unit 8. Depressured unit 9. Depressured unit Monday, October 03, 2005 Page 2 of 2 REPORT NO: 05-0511 ~.;:~..~ ~~ BPXA FLARE REPORT ., ~"`~'~"~' PRUDHOE BAY FACILITY: CCP DATE: 30 Sep 2005 TIME OF FLARING Black SYSTEM Start Stop Duratio n Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 03:35 03:40 0 Hrs 5Mins ^ ^ 0 32 MSCF 2. Flare/Relief Valve 04:00 04:05 OHrs SMins ^ ^ 0 32 MSCF 3. Flare/Relief Valve 05:07 05:22 O Hrs 15Mins ^ ^ 0 156 MSCF 4. Flare/Relief Valve 07:50 07:55 0 Hrs 5Mins ^ ^ p 14 MSCF 5. Flare/Relief Valve 10:30 10:35 0 Hrs SMins ^ ^ 0 11 MSCF 6. Flare/Relief Valve 17:15 17:30 0 Hrs 15Mins ^ ^ 0 156 MSCF 7. Flare/Relief Valve 19:15 19:30 0 Hrs 15Mins ^ ^ 0 135 MSCF 8. Flare/Relief Valve 21:30 21:35 0 Hrs 5Mins ^ ^ 0 35 MSCF 9. FlarelRelief Valve 22:50 22:55 0 Hrs SMins ^ ^ 0 14 MSCF TOTAL VOLUME 585 MSCF first Determination of Cause: 1. TC 1810 stop after water wash 2. TC 1810 combustion flameout 3. TC 1809 stop for water wash 4. TC 1813 esd'd for water wash 5. TC 1809 esd'd from spin cool 6. TC 1811 stop for water wash 7. TC 1807 shut down for water wash 8. TC 1811 esd'd off spin cool 9. TC 1807 esd'd off spin cool Monday, October 03, 2005 Page 1 of 2 REPORT NO: 05-0511 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CCP DATE: 30 Sep 2005 Action Taken to Stop Flaring: 1. Depressured unit 2. Depressured unit 3. Depressured unit 4. Depressred unit 5. Depressured unit 6. Depressured unit 7. Depressured unit 8. Depressured unit 9. Depressured unit Monday, October 03, 2005 Page 2 of 2 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition October-2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 316 137 3 Total Volume. 6. Sold , , Pool Name Pool Code Percent 287 725 213 PRUDHOE 640150 100.00% 7. Reinjected , , 2 65 8. Flared or vented 1 hour or less ,5 0 9. Flared or vented more than 1 hour (see instr.) n 33 784 d Purge 10. Pilot a , k 942 5 938 11. Used for lease operations (specify in Remar s) , , 0 Offlci;~l Use Only 12. Other (see instructions) Authorization >7 hr. Safet MGF 222 579 153 y 13. TOTAL VOLUME (ITEMS 6-12) , , Lease Use MCF 0 14. NGL Gas Equivalent Conservation MCF 0 15. Purchased gas Waste: MCF 16. Transferred from: CGF & FSi 222,579,153 0 Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Block 11: Fuel Gas = 5,938,942 mscf and Assist Gas = 0 mscf t hereby certify that the foregoing is true and r ct to the best of my knowledge. Note: All volumes must be Signature Title Mana er, Production Taxes and Ro alt corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Bernard W. Ha'n Pnone (so7)ssa-5ozs Date -C7 A th rit 20 25.2 Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT October 2005 Unplanned Events less than or equal to 1 hour ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/3/2005 2350-2355 45 Not required for unplanned events which Not required for unplanned events which 10/4/2005 0115-0120 8 are less than or equal to 1 hour are less than or equal to 1 hour 10/27/2005 2200-2205 135 TOTAL 188 Unplanned Events greater than 1 hour ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/1/2005 0140-0145 32 See attachments See attachments 10/1 /2005 0540-0545 8 10/1 /2005 0700-0715 135 10/1 /2005 1030-1035 14 10/2/2005 0600-0605 8 10/2/2005 1030-1035 135 10/2/2005 1345-1350 14 10/3/2005 0150-0155 8 10/3/2005 0235-0240 45 10/3/2005 0430-0440 135 10/3/2005 0735-0740 14 10/3/2005 1530-1535 135 10/3/2005 1910-1915 14 10/3/2005 2325-2330 8 10/4/2005 0045-0055 135 10/4/2005 1610-1615 14 10/5/2005 1020-1025 8 10/5/2005 1445-1450 8 10/5/2005 1700-1705 135 10/5/2005 2330-2335 135 10/6/2005 0250-0255 8 10/6/2005 0535-0540 8 10/7/2005 0300-0305 408 11 /6/2005 10/7/2005 1900-1905 420 1:20 PM BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT October 2005 10/8/2005 0810-0815 135 10/9/2005 1015-1020 135 10/9/2005 2315-2350 14 10/11 /2005 0830-0835 109 TOTAL 2,377 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKENTO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 188 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 2,377 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,784 Assist 0 TOTAL FLARED VOLUME 36,349 Page 2 11 /6/2005 1:20 PM REPORT NO: 05-05~ 2 k~xv~ .::~,. BPXA FLARE REPORT ~~t~-~~~'~` PRUDHOE BAY FACILITY: CCP DATE: Ol OCt 2005 TIME OF FL ARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:40 01:45 0 Hrs 5Mins ^ ^ © 32 MSCF 2. Flare/Relief Valve 05:40 05:45 0 Hrs 5Mins ^ ^ © 8 MSCF 3. Flare/Relief Valve 07:00 07:15 0 Hrs 15Mins ^ ^ © 135 MSCF 4. Flare/Relief Valve 10:30 10:35 OHrs 5Mins ^ ^ © 14 MSCF TOTAL V OLUME 189 MSCF First Determination of Cause: 1. TC 1811 stop after water wash 2. TC 1807 stop after water wash 3. TC 1805 stop for water wash 4. TC 1805 esd'd from spin cool Action Taken to Stop Flaring: 1. Depressured unit 2. Depressured unit 3. Depressured unit 4. Depressured unit Thursday, October 27, 2005 Page 1 of 1 y::.:=•. y:.3:<.~ :~~:;:;{;~ry;~ BPXA FLARE REPORT P DHOE BAY R U REPORT NO: 05-051 G FACILITY: CCP DATE: 02 OCt 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 06:00 06:05 OHrs 5Mins ^ ^ 0 8 MSCF 2. Flare/Relief Valve 10:30 10:35 0 Hrs 5Mins ^ ^ © 135 MSCF 3. Flare/Relief Valve 13:45 13:50 0 Hrs 5Mins ^ ^ © 14 MSCF TOTAL V OLUME 157 MSCF First Determination of Cause: 1. t/c 1805 a normal stop after water wash 2. t/c normal stop for water wash 3. t/c 1801 esd after spin cool Action Taken to Stop Flaring: 1. depressured unit 2. depressured unit 3. depressured unit Thursday, October 27, 2005 Page 1 of 1 ~.~<$, . BPXA FLARE REPORT ~:. PRUDHOE BAY REPORT NO: 05-0519 FACILITY: CCP DATE: 03 OCt 2005 TIME OF FL ARING Black SYSTEM Start Stop Duratio n Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:50 01:55 0 Hrs 5Mins ^ ^ © 8 MSCF 2. Flare/Relief Valve 02:35 02:40 0 Hrs 5Mins ^ ^ © 45 MSCF 3. Flare/Relief Valve 04:30 04:40 0 Hrs 10Mins ^ ^ © 135 MSCF 4. Flare/Relief Valve 07:35 07:40 0 Hrs 5Mins ^ ^ © 14 MSCF 5. Flare/Relief Valve 15:30 15:35 OHrs SMins ^ ^ © 135 MSCF 6. Flare/Relief Valve 19:10 19:15 0 Hrs SMins ^ ^ 0 14 MSCF 7. Flare/Relief Valve 23:25 23:30 0 Hrs 5Mins ^ ^ © 8 MSCF 8. Flare/Relief Valve 23:50 23:55 OHrs 5Mins ^ ^ ^ 45 MSCF TOTAL V OLUME 404 MSCF First Determination of Cause: 1. TC 1801 normal stop after water wash 2. TC 1801 tripped on low speed gear inboard vibration 3. TC 1804 normal stop for water wash 4. TC 1804 esd'd from spin cool 5. TC 1806 normal stop for water wash 6. TC 1806 esd'd after spin cool 7. TC 1806 stop after water wash 8. TC 1806 tripped during start Action Taken to Stop Flaring: 1. Depressured unit 2. Depressured unit Thursday, October 27, 2005 Page 1 of 2 :<...... 3~ w N:.......h\ ~~ ~~~~ . FACILITY: CCP 3 1~ Depressured unit ~f! Depressured unit S 1~' Depressured unit b ~,3' Depressured unit Depressured unit y~ Depressured unit BPXA FLARE REPORT PRUDHOE BAY DATE: 03 Oct 2005 REPORT NO 05-0519 Thursday, October 27, 2005 Page 2 of 2 REPORT NO: 05-0520 ,:.:}.. ryv34 .~`:: BPXA FLARE REPORT ~V~~-~ PRUDHOE BAY FACILITY: CCP DATE: 04 OCt 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:45 00:55 0 Hrs 10Mins ^ ^ © 135 MSCF 2. Flare/Relief Valve 01:15 01:20 0 Hrs SMins ^ ^ ^ 8 MSCF 3. Flare/Relief Valve 16:10 16:15 OHrs SMins ^ ^ 0 14 MSCF TOTAL V OLUME 157 MSCF First Determination of Cause: 1. TC 1803 stop for spin cool 2. TC 1803 tripped on high vibration while starting for spin cool 3. TC 1803 esd'd for work on locked coupling and water wash Action Taken to Stop Flaring: 1. Depressured unit 2. Depressured unit 3. Depressured unit Thursday, October 27, 2005 Page 1 of 1 REPORT NO: 05-0525 ~~~€<~v~ >v. .~::,;' BPXA FLARE REPORT PRUDHOE BAY FACILITY: CCP DATE: 05 OCt 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 10:20 10:25 0 Hrs 5Mins ^ ^ © 8 MSCF 2. Flare/Relief Valve 14:45 14:50 0 Hrs SMins ^ ^ © 8 MSCF 3. Flare/Relief Valve 17:00 17:05 0 Hrs 5Mins ^ ^ © 135 MSCF 4. Flare/Relief Valve 23:30 23:35 OHrs 5Mins ^ ^ © 135 MSCF TOTAL V OLUME 286 MSCF First Determination of Cause: 1. shut down t/c 1803 after spin cool 2. shut down t/c 1803 after water wash 3. normal stop t/c 1803 to spin cool to repair vibration probe 4. normal stop t/c 1802 to spin cool Action Taken to Stop Flaring: 1. depressured unit 2. depressured unit 3. depressured unit 4. depressured unit Thursday, October 27, 2005 Page 1 of 1 REPORT NO: 05-0528 €~ ,Y. >.3~ :~: `. ~~ BPXA FLARE REPORT -:: k-~~~~~~~~ PR DH E BAY ~.~~ U O FACILITY: CCP DATE: 06 OCt 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 02:50 02:55 OHrs SMins ^ ^ © 8 MSCF 2. Flare/Relief Valve 05:35 05:40 0 Hrs 5Mins ^ ^ © 8 MSCF TOTAL VOLUME 16 MSCF First Determination of Cause: 1. normal stop t/c 1802 off spin cool 2. normal stop t/c 1802 after water wash Action Taken to Stop Flaring: 1. depressured unit 2. depressured unit Thursday, October 27, 2005 Page 1 of 1 REPORT NO: 05-0530 ~~ .Y: y~l.{ .,:}:~h ~~, BPXA FLARE REPORT ~`~~~~ PRUDHOE BAY ~~`. FACILITY: CCP DATE: 07 OCt 2005 TIME OF FLARWG Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 03:00 03:05 0 Hrs SMins ^ ^ © 408 MSCF 2. Flare/Relief Valve 19:00 19:05 0 Hrs 5Mins ^ ^ © 420 MSCF TOTAL VOLUME 828 MSCF First Determination of Cause: 1. normal stop t/c 1876 for discharge valve repair 2. esd t/c 1878 for discharge valve repair Action Taken to Stop Flaring: 1. depressured unit 2. depressured unit Thursday, October 27, 2005 Page 1 of 1 REPORT NO: 05-0531 ,.. ~. ,~:< :.: BPXA FLARE REPORT ~~::~. :_::~. ..;.:.. _~. PRUDHOE BAY FACILITY: CCP DATE: 08 OCt 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 08:10 08:15 0 Hrs 5Mins ^ ^ 0 135 MSCF TOTAL VOLUME 135 MSCF First Determination of Cause: 1. normal stop Uc 1808 for maint. Action Taken to Stop Flaring: 1. depressured unit Thursday, October 27, 2005 Page 1 of 1 ~~-;::- s,..?.. ..}:~~,. BPXA FLARE REPORT ~'~~{-°~~ PRU DHOE BAY REPORT NO: 05-0532 FACILITY: CCP DATE: 09 OCt 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 10:15 10:20 O Hrs 5Mins ^ ^ 0 135 MSCF 2. Flare/Relief Valve 23:15 23:20 0 Hrs SMins ^ ^ 0 14 MSCF TOTAL VOLUME 149 MSCF First Determination of Cause: 1. t/c 1802 normal stop for spin cool 2. esd t/c 1802 after spin cool for maint. Action Taken to Stop Flaring: 1. depressured unit 2. depressured unit Thursday, October 27, 2005 Page 1 of 1 REPORT NO: 05-0535 ~~~~~ .~~~.' BPXA FLARE REPORT ~'~~~~~_~ PRU DHOE BAY ~~. FACILITY: CCP DATE: 11 OCt 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 08:30 08:35 0 Hrs 5Mins ^ ^ © 109 MSCF TOTAL VOLUME 109 MSCF First Determination of Cause: 1. t/c 1876 normal stop after water wash Action Taken to Stop Flaring: 1. depressured unit Thursday, October 27, 2005 Page 1 of 1 FW:GPB Gas Venting Incident Subject: F~~': (;PF3 Gas Ventingin~ident From: "GP13, Prod O~~t ~fL" <GPRProdOptTL@BP.com> llatc: Mon, lO Opt ?Oi)~ 1-I:3~: I ~ -O300 ~fo: "ste~~e nu main s~a`admin.state.ak.us" <'ste~~e mcmains~c~-:ad~nir~.state.~~il~.us'-~. °G PR. G~~s Plants Area I~~1gr" ~GY13GasPlant,l~L~u)I3P.cor7>>, "GPE3, F.m-iron TL" ~ GPBEm~ironTl,~ciBP.com>. "GPE3, Fm~iron r~d~~isor Cast" ~~GPBInviron~~~dvisorLasta%I3P.c~~m=, "Fiedler, ~~nnc 1\-1" <FicdlcA[~1~u,BP.com~~ "Ranson. Gary .1" -=~RensonGrl,~L~I3P.ron1:~~, "Pfeiffer, .lim :1" ~.Iim.Pleifler(~1-13P.con1=, °Kur~, John~~ `John.kur~%u; f3P.con~== Steve, After the gas plant operators saw my volume (374) they suspected I had the wrong number. They reconfirmed the pipe length measurements and have asked me to change the vented gas volume for this event to 1,140 MSCF. I apologize for the confusion. If you have questions, please do not hesitate to call me. Hal From: GPB, Prod Opt TL Sent: Monday, October 10, 2005 9:11 AM To: 'stave mcmains@admin.state.ak.u:~; GPB, Gas Plants Area Mgr; GPB, Environ TL; GPB, Environ Advisor East; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Kurz, John Subject: GPB Gas Venting Incident To: Steve McMains, AOGCC stave mcmains~~admin.state.ak.us 907-793-1241, fax 907-276-7542 From: Hal Tucker, GPB Prod Optim Team Leader Gas venting occurred at CCP on October 7, 2005. Approximately 374 MSCF of gas was vented to finish the safe-out required for repair of a leaking block valve on the discharge side of the CCP tandem compressors. Additional physical measurement and calculation is required to establish the final reported vented volume. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659-4472 1 of 1 10/11/2005 9:04 AM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition November-2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 8 8 Total Volume. 6. Sold 3,57 ,3 5 Pool Name Pool Code Percent 229 750 510 PRUDHOE 640150 100.00% 7. Reinjected , , 887 8. Flared or vented 1 hour or less 9. Flared or vented more than 1 hour (see instr.) 0 661 32 10. Pilot and Purge , 186 608 11. Used for lease operations (specify in Remarks) , 6, pfficial Use Only 12. Other (see instructions) 0 Authorization >1 hr: Safet MGF 1 0 y 13. TOTAL VOLUME (ITEMS 6-12) 239,549, 5 L e U MCF ~ ease s 14. NGL Gas Equivalent nservation C MCF o 15. Purchased gas 0 Waste: MCF 16. Transferred from: CGF & FSi 239,549,051 0 Commissioner Date 17. Transferred to: (Express as a negative #) 18. Remarks: Block 11: Fuel Gas = 6,186,608 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is tr and orrect to the best of my knowledge. Note: All volumes must be Signature Title Mana er, Production Taxes and Ro alt corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Bernard W. Han Phone (907)564-5028 Date a "- ~~~ t rit AA 5. Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT November 2005 Un tanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which Not required for unplanned events which are Tess than or equal to 1 hour are less than or equal to 1 hour TOTAL 0 Unplanned Events greater than 1 hour ~ DATE TIME- VOLUME ' DESCRIPTION'OF INCIDENT'& CAUSE ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~ DATE TIME ^ VOLUM ESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/16/2005 0030-0040 408 See attachments See attachments 11 /16/2005 0400-0415 152 11 /25/2005 1443-1448 109 11 /25/2005 1553-1558 109 11 /25/2005 1736-1741 109 TOTAL 887 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~ DATE TIME "VOLUME DESCRIPTION OFINCIDENT &'CAUSE ACTION:TAKEN'TO ELIMINATE CAUSE See attachments See attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 887 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 32,601 Assist 0 TOTAL FLARED VOLUME 33,548 12/5/2005 10:02 AM <;;~ ::{h~' BPXA FLARE REPORT ~.:: -,~. ~~~~~~~~°~ ~`~~~ ~ P R U D H O E BAY REPORT NO: 05-05$9 FACILITY: CCP DATE: 16 NOV 2005 TIME OF FLARING Black SYSTEM Start Stop Duration intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:30 00:40 0 Hrs 10Mins ^ ^ © 408 MSCF 2. Flare/Relief Valve 04:00 04:15 0 Hrs 15Mins ^ ^ 0 152 MSCF TOTAL VOLUME 560 MSCF First Determination of Cause: 1. 1876 shut down to spin cool for major overhaul 2. 1876 ESD'd after spin cool Action Taken to Stop Flaring: 1. Unit depressured 2. Unit derpressed Tuesday, November 22, 2005 Page 1 of 1 REPORT NO: 05-0597 :<. ,..;.;, ~,. •:5:~ ;~;~, BPXA FLARE REPORT '~~='~ PRUDHOE BAY ~~ FACILITY: CCP DATE: 25 NOV 2005 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 14:43 14:48 0 Hrs SMins ^ ^ Q 109 MSCF 2. Flare/Relief Valve 15:53 15:58 0 Hrs SMins ^ ^ © 109 MSCF 3. Flare/Relief Valve 17:36 17:41 0 Hrs 5Mins ^ ^ © 109 MSCF TOTAL V OLUME 327 MSCF First Determination of Cause: 1. T/C 1876 leak check after maintenance 2. T/C 1876 Water Wash complete. 3. S/D T/C 1876 to replace bleed air valve solenoid Action Taken to Stop Flaring: 1. Depressured T/C 1876 2. Depressured T/C 1876 3. Depressured T/C 1876 Friday, December 02, 2005 Page 1 of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator BP 5. Month/Year of Disposition December-2005 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of 485 205 3 Total Volume. 6. Sold , , Pool Name Pool Code Percent 449 515 212 PRUDHOE 640150 100.00% 7. Reinjected , , 41 8. Flared or vented 1 hour or less 1 h 0 our (see instr.) 9. Flared or vented more than 1 745 10. Pilot and Purge 33, 2 11. Used for lease operations (specify in Remarks) 6,132,8 7 0 Offlclal Use Only 12. Other (see instructions) Authorization >t hr: Safet MCF 713 221 821 y 13. TOTAL VOLUME (ITEMS 6-12) , , Lease Use MCF 14. NGL Gas Equivalent ~ Conservation MCF 0 15. Purchased gas Waste: MCF 16. Transferred from: CGF & FS1 221,821 ,713 Commissioner Date 17. Transferred to: (Express as a negative #) 0 18. Remarks: Block 11: Fuel Gas = 6,132,827 mscf and Assist Gas = 0 mscf I hereby certify that the foregoing is true d c rr to the best of my knowledge. Note: All volumes must be Signature Title Mana er, Production Taxes and Ro alt corrected to pressure of 14.65 psia and to a temperature of 60o F. Printed Name Bernard . Ha'n Phone (907)564-5028 Date ~ ~D~ A th rit AA 25.2 Form 10-422 Rev. 1/2004 Submit in Duplicate BP EXPLORATION (ALASKA) INC. Page 1 PRUDHOE BAY UNIT -CENTRAL COMPRESSOR PLANT GAS FLARING INCIDENT REPORT December 2005 Unplanned Events less than or equal to 1 hour ~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE, ACTION TAKEN TO'ELIMINATE CAUSE 12/30/2005 0235-0240 141 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 141 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO'ELIMINATE CAUSE See attachments Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE ~IM ~ VOLUME DESCRIPTION OF'JNCIDENT &'CAUSE ACTION TAKEN TO ELIMINATE. CAUSE See attachments See attachments TOTAL 0 TOTAL "' Unplanned Events < 1 Hour 141 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,745 Assist 0 TOTAL FLARED VOLUME 33,886 1 /6/2006 3:47 PM