HomeMy WebLinkAboutPrudhoe Bay Unit FS 2 / BPSTATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2006
FACILITY: PBU FS 2
OPERATOR: BP EXPLORATION
1. Facility Number
0290000029
2 Fatiliry Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
5. MontlWeW d Disposition
(January-2006
Disposition
Volume MCF
20. Fa production from multiple pools. list contribution of each pool as a percent d
Total Volume.
9. Sd0
0
/
Pool Name
Pool Code
Percent
T. Reinjected
0
PRUDHOE
640150
100.00%
6. Flared or vented 1 lour of less
363
9. Flared or mire vented re 1 lour (see kutr.)
711
10 Pad and Purge
19,135 .7
11. used tor base operatons (specify in Remarks)
727,715
12. Outer (see instructions)
0
Authorization >1 hr
Salary
1'
MCF
13. TOTAL VOLUME (ITEMS 612)
747,924
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
16. Transferred from: CGF
328,532
�1
/ Pa� 3-70 -OL
co ra leer Date
17. Traened to (Express as a negative e) CGF
- 19,553213
18 Remade: Block I I : Fuel Gas = 727,711 muf and Assist Gas = 4 mscf
thereby certify that the foregoing is true and correct to the best of my knowledge.
//�� L_
Signature t1 0 1�_ 1 '� The Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psla
e � Authori re AA 25235. F.
to a tempeture of 600
B
Printed Name W. Hajny Phone (907)594 -5028 ogee Z — � -C 0.C.
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
(Unplanned Events less than or equal to 1 hour
1
DATE
1/5/2006
1/12/2006
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
0838- 0924 223 Not required for unplanned events <= 1 hour
2111 -2144 140
TOTAL
(Unplanned Events greater than 1 hour
1
DATE TIME
1/13/2006 0011 -1707
1/22/2006 2053 -2156
TOTAL
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
DATE TIME
TOTAL
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Piot Purge
Assist
TOTAL FLARED VOLUME
363
VOLUME DESCRIPTION OF INCIDENT & CAUSE, _.- F ,,..,�
353 See attachments
358
711
VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
0
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
VOLUME_ „ DESCRIPTION OF INCIDENT & CAUSE
See attachments
0
TOTAL
363
711
0
0
19,135':
Si 4
20,213
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
January 2006
ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events which
ACTION TAKEN TO EUMINATE CAUSE,
See attachments
,..:. ACTION TAKEN TO EUMINATE CAUSE „
See attachments
Page 1
2/8/2006
1:37 PM
ti
FACILITY: FS2 DATE: 13 Jan 2006
REPORT NO:
BPXA FLARE REPORT
PRUDHOE BAY
06 -0026
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:11 17:07 16 Hrs 56Mins R ❑ ❑ 353 MSCF
TOTAL VOLUME 353 MSCF
First Determination of Cause:
1. FLARED INTERMITTENLY DUE TO BESD VALVES BLOWING DOWN
WHILE TROUBLE SHOOTING OUR LPS S/D
Action Taken to Stop Flaring:
1. ISOLATED THE S/D CAUSE AND RESTARTED THE PLANT
Monday, January 23, 2006 Page 1 of 1
ti
FACILITY: FS2 DATE: 22 Jan 2006
REPORT NO: 06-0050
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 20:53 21:56 1 Hrs 3Mins ❑ ❑ ❑ 358 MSCF
TOTAL VOLUME 358 MSCF
First Determination of Cause:
1. 1801 STV/IP COMPRESSOR SHUTDOWN DUE TO HIGH DISCHARGE TEMPERATURE
Action Taken to Stop Flaring:
1. START 1802 STANDBY COMPRESSOR
FLARE BASED UPON 63 MINUTES AT 7.5 MMSCFD RATE
Monday, January 30, 2006 Page 1 of 1
1 Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Opsntor
BP
BP
5. Mon
February
Disposition
Volume MCF
/
/
20. For production from multiple pods, list contribution of each pool as a percent ol
Tow Volume
6. Sold
0
Pod Name
Pool Code
Percent
7 Reintectee
0
PRUDHOE
640150
100.00%
8. Flared or vented 1 hour or less
109
9. Find or vented more than 1 Mourn (see irotr.)
109
10. Pad and Purge
17,425
11. Used for lease operations (specify Si Remarks)
679,800
: ,EU,r, v : _
Authorization >1 hr.
'vS„M,7.7 -1 7 77,_.-.:c.
Sale y
f. „.
I
t i n
12 Mar (nee instructions)
0
13. TOTAL VOLUME (ITEMS 612)
697,443
Lease Use
MCF
14. NGL Gas Equivalent
0
cameo/anon
MCF
15. Purchased gas
0
Waste -
MCF
16. Transferred from: CGF
307,275
f� 4 - / /-0
Commissioner Date
17. Transferred to: (E>rpresa as a negative 1) CGF
-15,769,897
le. Remarks. Bieck 11: Fuel Gas = 619,800 msct and Assist Gas = 0 reset
I hereby certify that the 1. egdrg
is true and . : ' to the best of my knowledge.
e anager, Production Taxes and Royalty
as taM
Note: All volumes must be
corrected to pressure of 14.65 psla
and to a temperature of 60o F.
Authority 20 AAC25.235.
Signature ..4_ ___!
f
Printed Name Bernard . Hajny Phone (907)564-5026 Date 3 /3-74'
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1
(Unplanned Events less than or equal to 1 hour
VOLUME DESCRIPTION OF INCIDENT & CAUSE - ,.- - ,. ACTION TAKEN TO EUMINATE CAUSE
109 Not required for unplanned events c 1 hour Not required for unplanned events which
DATE
2/4/2006
DATE
DATE ,-,
V TIME
0600 -0650
TOTAL
DATE TIME
2/19 /2006 0300 -1800
TOTAL
TIME.
TOTAL
TIME
TOTAL
Untamed Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Plot Purge
Assist
TOTAL FLARED VOLUME
109
109
0
0
jolt TOTAL
109
109
0
0
17.4251
A
17,643
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-2
GAS FLARING INCIDENT REPORT
February 2006
1
(Unplanned Events greater than 1 hour
VOLUME DESCRIPTION OF INCIDENT & GAUSE :: =sr : ,; ACTION TAKEN TO ELIMINATE CAUSE
109 See attachments See attachments
1
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
VOLUME, DESCRIPTION OF INCIDENT & CAUSE Fr
See attachments
ACTION TAKEN TO EUMINATE CAUSE ,
See attachments
1
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
VOLUME.,_ DESCRIPTION OF INCIDENT & CAUSE „;,., ACTION TAKEN TO EUMINATE CAUSE
See attachments See attachments
Page 1
3/7/2006
10:19 AM
t�
FACILITY: FS2 DATE: 19 Feb 2006
Action Taken to Stop Flaring:
1. SI depressuring
REPORT NO: 06-0095
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 03:00 18:00 15Hrs OMins ® ❑ ❑ 109 MSCF
TOTAL VOLUME 109 MSCF
First Determination of Cause:
1. Depressure C/L 11A and 11D for maintenance work at DS11.
Wednesday, February 22, 2006 Page 1 of 1
1. Facility Number
0290000029
2. Facility Name
3. Field Id. Operator 15. MaMI d Disposition
PBU - EOA IBP (March - 2006
PBU FS 2
Disposition
Volume MCF
20. For production from models pods, list contnbution of each pool as a pecan of
Total Volume
6. Sold
0
Pod Name
Pod Caas
Percent
7 Reinjected
0
PRUDHOE
840150
100.00%
8. Flared tx vented 1 hour or Mss
0
9. Flared or vented more than 1 Hour (see Fstr.)
0
10. Pad and Purge
19,389
11. Used for lease operations Opacity in Remarks)
754,200
_.
12. Other (see Instructions)
0
Autfonzatfon >1 hr
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
773,589
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
0
Waste
MCF
it Transferred from: CGF
337,294
commissiceer MM
17. Transtened to: (Express as a negative 1) CGF
- 15 782 832
ta. Remarks: Block t I: Fuel Gas = 754,200 nscf and Assist Gas = 0 msscf
1 hereby comfy that the foregoing
Signeture
is a to the best of my knowledge.
me Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psla
and to a temperature 5.35. F.
Authority 20 AAC25.235.
Printed Name Bemard W. Rainy Phone (907)5!4 -5028 Ca '/ /�
P 7 _l 7�1� �
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit In Duplicate
TOTAL
TOTAL
TOTAL
Planned Events c 1 hour and not
exceeding 5,000 MCF
Planned Events, 1 hour or
exceeding 5,000 MCF
Piot Purge
Assist
TOTAL FLARED VOLUME
0
0
0
TOTAL
! !if!,-.t4 _ TOTAL!.
Unplanned Events c 1 Hour 0
Unplanned Events > 1 Hour 0
0
0
19,3 e
— 14
19 390
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-2
GAS FLARING INCIDENT REPORT
March 2006
J
'Unplanned Events less than or equal to 1 hour
DATE , 11ME VOLUME_ DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events c= 1 hour Not required for unplanned events which
1
!Unplanned Events greater than 1 hour
DATE, TIME VOLUME„, DESCRIPTION OF INCIDENT & CAU ACTION TAKEN TO EUMINATE CAUSE
See attachments See attachments
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE .%!_%. % TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
See attachments See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
1
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE VOLUME.,„„ DESCRIPTION OF INCIDENT & CAUSE__ ACTION TAKEN TO EUMINATE CAUSE
Par 1
4/10/2006
11:20AM
1. " Fa Number 2 Fs. Name
Facility r Facility
0290000029 IPBU FS 2
3. Field 14.
PBU - EGA
Operator
BP
S. ManeWn,d �PV
April - 2006
Disposition
Volume MCF
J
20. For production from multiple pools, list contribution at each pod as a percent of
Total Vdume
8. Sold
0
Pod Name
Pod Code
Percent
7 Rejected
0
PRUDHOE
640150
100.00%
9. Flared or vented 1 hour or Mss
120
9. Flared or versed more lharl 1 hour (see itsb.)
1,301
10. Plot and Purge
18,870
11. Used fa lease operations (specify in Remarks)
725,982
12. Other (see instructions)
O
Authorization >1 hr
Safety
1 i 301
MCF
13. TOTAL VOLUME (ITEMS 6-12)
746,273
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
0
Wa
MCF
. Transferred trap: CGF
1 7.
324,276
n
J , at ,.. f _ -2 _ /�� 0,,
C // �/`-�
Transferred
17. b: (Express as a negative e) CGF (Express
5,998, 989
5,996,
18. Remarks: Block 11: Fuel Gas = 725,982 mut and Assist Gas = 0 Duct
1 hereby certify mat the foregoing is true an car the best d my knowledge.
Signature me Manager, Production
Taxes and Royalty
Date ) 0 - --//—al
Note: All volumes must be
corrected to pressure of 14.85 psis
a to a temperature of BOo F.
Authority 20 AAC25.235.
Rimed Name Bemard W. Hajny Phone (907)564 -5028
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
SsP
I
!Unplanned Events less than or equal to 1 hour
____ VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE ,„,„
60 Not required for unplanned events c= 1 hour Not required for unplanned events which
60
DATE TIME
4/20/2006 2140 -2200
4/22/2006 2224 -2246
TOTAL
1
(Unplanned Events greater than 1 hour
DATE TIME . — VOLUME DESCRIPTION OF INCIDENT & CAUSES -r_, .:, i ACTION TAKEN TO EUMINATE CAUSE -
4/20/2006 0145 -0408 496 See attachments
4/20/2006 1610 - 1754 361
4/22/2006 1944 - 2209 444
TOTAL
. DATE
TOTAL
TOTAL
Piot Purge
Assist
TOTAL FLARED VOLUME
120
1,301
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
April 2006
See attachments
1
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE ,, TIME,,, VOLUME . DESCRIPTION OF INCIDENT i CAUSE ACTION � ;. ; � , , ACTION TAKEN TO ELIMINATE CAUSE
See attachments
0
0
TOTAL
Unplanned Events <1 How 120
Unplanned Events> 1 Hour 1,301
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Flamed Everts > 1 hour or 0
exceeding 5,000 MCF
Me 18,870
i111.11
20.291
See attachments
See attachments
1
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
TIME, VOLUME, DESCRIPTION OF INCIDENT & CAUSE,, -., .a.. ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Page
59/2006
9:39 AM
t�
FACILITY: FS2 DATE: 20 Apr 2006
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Other 01:45 04:08 2Hrs 23Mins ❑ ❑ ❑ 496 MSCF
2. Flare/Relief Valve 16:10 17:54 1 Hrs 44Mins ❑ ❑ ❑ 361 MSCF
3. Flare/Relief Valve 21:40 22:00 0 Hrs 2OMins ❑ ❑ ❑ 60 MSCF
TOTAL VOLUME 917 MSCF
2. Water washed 16 - 1804.
REPORT NO: 06 -0225
BPXA FLARE REPORT
PRUDHOE BAY
First Determination of Cause:
1. Shut down and spin cooled 1804 for water wash and maintenance
3. Shut down 16 -1803 for maintenance and spring water wash.
Action Taken to Stop Flaring:
1. Completed cooldown.
Volume based upon 5mmscf /d = 3472 scf per minute x 143 minutes
2. Completed water wash
Volume Based upon 5 mmscf /d = 3472 x 50 minutes
3. completed case de- pressure.
Tuesday, April 25, 2006 Page 1 of 1
FACILITY: FS2 DATE: 22 Apr 2006
Action Taken to Stop Flaring:
1. completed water wash
2. restart 1803
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 19:44 22:09 2 Hrs 8Mins lii ❑ ❑ 444 MSCF
2. Flare/Relief Valve 22:24 22:46 0 Hrs 22 Mins ❑ ❑ ❑ 60 MSCF
TOTAL VOLUME 504 MSCF
First Determination of Cause:
1. 1803 waterwash based on total of 128 minutes x 3472 = 444mscfd
2. 1803 shutdown after attempt of start from maintenance.
Based upon case depsi 60mscfd
REPORT NO: 06-0227
Tuesday, April 25, 2006 Page 1 of 1
Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA I 1.
4. operator 5. MondWear of Disposition May -2006
Disposition
Volume MCF
"
20. For production from multiple pools, Rat contribution of each pod am a percent of
Total Volume.
6. Sam
O
Pool Name
Pool Code
Percent
7 Reinjected
0
PRUDHOE
640150
100.00%
8. Flared or vented 1 has or kiss
0 ,/
9. Flared or vented more than 1 how (see Instr.)
458 t.'
10. Plot and Purge
18,923 -
11. Used for lease operations (specify In Remarks)
801,925
12. Weer lase instructions)
()
Authortzadon ,.1 hr
safety
44Y7
MCF
13. TOTAL VOLUME (ITEMS (I-12)
821,306
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
16. Transferred from: CGF
349,743
7-/ ,l —010 � � � ate
17. Transferred to: (Express as a negative 1) CGF
- 20,466,252
18. Remarks: Block 11: Fuel Gas = 801,925 ttecf and Assist Gas = 0 itucf
1 hereby certify that the 1 poirlg
Signature
is true and o o the best of my knowledge.
rme Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F.
Authority 20 AAC25235.
Printed Name Bemard . Halny
A
Phone (907)564-5028 Date 6 �� - o6
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Subrnit in Duplicate
JSEP-
1
'Unplanned Events less than or equal to 1 hour
VOLUME„,„ DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events <= 1 hour Not required for unplanned events which
.s DATE „ _y
TIME_. p
TOTAL
1
(Unplanned Events greater than 1 hour
VOLUME DESCRIPTION OF INCIDENT & CAUSE
458 See attachments
DATE _„.. TIME
5/30/2006 1456 -1646
TOTAL
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
DATE TIME
TOTAL
VOLUME..
0
458
0
0
TOTAL-
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 458
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge INS 181823'
Assist 0'
TOTAL FLARED VOLUME 19,381
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-2
GAS FLARING INCIDENT REPORT
May 2006
ACTION TAKEN TO EUMINATE CAUSE
See attachments
DESCRIPTION OF INCIDENT & CAUSE_,,--_ ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
Walt
1
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mef
DATE ._ TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE gigagramenarm ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
Par
8/8/2006
1:50 PM
t�
FACILITY: FS2 DATE: 30 May 2006
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING
SYSTEM Start Stop Duration
1. Flare/Relief Valve
14:56 16:46 1 Hrs 50Mins ❑
Action Taken to Stop Flaring:
1. shut in 11 -16, 11 -37, 9-4, 4 -21, 4 -22, 4 -23, 4 -30, 3 -19.
repaired problem, restarted turbine.
Wednesday May 31, 2006
REPORT NO: 06-0260
Stack
Intermittent Smoke Planned VOLUME
❑ ❑ 458 MSCF
TOTAL VOLUME 458 MSCF
First Determination of Cause:
1. 1803 seal all overhead high level shutdown. Caused by instrument failure.
Flare voulume figured on 1803 throughput minus the gas cut to get off flare. 60mmscfd x 110
minutes
Page 1 of 1
FW: GPB Flarieg
Subject: FW: GPB Flaring
From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>
Date: Sun, 04 Jun 2006 16:23:40 -0800
To: steve_mcmains a, in.state.ak.u5
CC: "Kurz, John" <john.kurz®BP.com>, "GPB, Environ TL" <GPBEnvi onTL@BP.com>, "GPB,
Environ Advisor East" <GPBEnvironAdvisorEast @BP.com >, "Fiedler, Anne M"
<Anne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A"
cfim.Pfeifl'er@BP.com>t "GPB, FSVCOTI4Atea Mgr ".<GPBFS2TL44BP.com?
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 - 793 -1241, fax 907 - 276 -7542
From: Hal Tucker, Prod Optimization Team Leader (907 - 659 -4472)
An extended flaring event occurred at FS2 on May 30. LPS machine 1803 shut down due to an
instrument failure indicating high level in the overhead seal oil. Flaring occurred for 1 hour and 50
minutes, total volume flared was 458 MSCF
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Production Optimization Team Leader
bp Exploration AK, Inc
(907) 659 -4472
1 of 1 6/5/2006 7:19 AM
1 Facility Number
0290000029
2. Faality Name
PBU FS 2
3. Field
PBU - EOA JBP
14. Operas'
15. MontlWaer of Disposition
(June-2006
Disposition
Volume MCF
20. For production from multiple pods, list contribution of each pod as a percent of
Total Volume
8. Sad
0
Pool Name
Pool Code
Percent
7. Reinjected
0
PRUDHOE
640150
100.00%
8. Flared or vented 1 hour or less
1,024 1
9 Flared or vented more than 1 Ina (See Instr.)
986 ,i
i
10. Not and Purge
18,207 `l
11. Used for base operations (specify in Remarks)
763,613
12 Other (sea instructions)
0
ArNdrization>7 hr.
Safety
ego
MCF
13. TOTAL VOLUME (ITEMS 6-12)
783,830
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Prachased On
0
Waste:
MCF
m
16. Transferred fro CGF
327,141
/
�p
g ' /a ' € �
ale
17. Transferred b: (Ewes as a negative s) CGF
-17,030,900
18. Remarks. Block 11. Fuel Gas = 763,609 inset and Assist Gas = 4 tlscf
I hereby certify pat the foregoing is true a m to the best of my knowledge.
Signature e Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 600 F.
Authority 20 AAC25.235,
�)
Printed Name Bernard . Hajny Phone (907)564 -5026 Dab 7 J/C C &
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Form 10-422 Rev. 1/2004
Submit in Duplicate
1
'Unplanned Events Tess than or equal to 1 hour
1
F DATE
6/11/2006
6/25/2006
6/28/2006
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE—, ACTION TAKEN TO ELIMINATE CAUSE - -, -:. „ =
1052 - 1151 229 Not required for unplanned events <= 1 hour Not required for unplanned events which
1510 -1552
1149 - 1240
TOTAL
1
'Unplanned Events greater than 1 hour
DATE TIME , VOLUME DESCRIPTION OF INCIDENT & CAUSE , ACTION TAKEN TO EUMINATE CAUSE -
6/24/2006 1943 - 2315 986 See attachments See attachments
DATE
TOTAL
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
VOLUME,, DESCRIPTION OF INCIDENT & CAUSE
See attachments
TIME
TOTAL
1
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
ram DATES TME VOLUME DESCRIPTION OF INCIDENT & CAUSE, ACTON TAKEN TO ELIMINATE CAUSt
See attachments See attachments
TOTAL
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Piot Purge
Assist
TOTAL FLARED VOLUME
583
212
1,024
986
0
0
leak TOTAL
Unplanned Events c 1 Hour 1,024
986
0
0
18,207
— 4'
20 221
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-2
GAS FLARING INCIDENT REPORT
June 2006
ACTION TAKEN TO ELIMINATE CAUSE ,
See attachments
Page 1
7/12/2008
9:56 AM
FACILITY: FS2 DATE: 24 Jun 2006
REPORT NO: 06-0302
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 19:43 23:15 3 Hrs 32Mins ❑ [❑ ❑ 986 MSCF
TOTAL VOLUME 986 MSCF
First Determination of Cause:
1. 1802 it compressor shutdown on high ip compressor discharge temperature.
Action Taken to Stop Flaring:
1. Attempted restart on 1802 but unable to get permissives. Attempted several starts on standby
turbine 1801 called out maintenance and got 1801 started.
Flare volume based on 6.7 mmscfd x 212 minutes = 986mscfd
Friday, June 30, 2006 Page 1 of 1
GPB Flaring
•
Subject: GPB Flaring
From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>
Date: Sun, 25 Jun 2006 08:43:27 -0800
To: seve mcmains@admin.state.ak.us
CC: "Kurz, John" <john.kurz@BP.com >, "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB,
Pnviron Advisor East" <GPBEnvironAdvisorEast@BP.com >, "Fiedler,. Anne M"
tAnne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A"
fclimPfeiffer@BEtatIVGPB, FS2/COTLI,Ara>s Mgr" GPBFS2 BP
To: Steve McMains, AOGCC
steve_mcmains @admin.state.ak. us
907 - 793 -1241, fax 907 - 276 -7542
From: Hal Tucker, Prod Optimization Team Leader (907 - 659 -4472)
An extended flaring event occurred at FS2 at 1943 on June 24. STV /IP compressor 1802 shut down due
to high compressor discharge temperature (related to high ambient temperatures). Several restart
attempts on both 1802 and 1801 STV /IP machines failed, so an instrument tech and a mechanic were
called out. After a significant amount of troubleshooting, an adjustment was made to the "Start Fuel Gas
Pressure" and the 1801 machine was brought on line and loaded up. Duration of the event was 3 hours
and 32 minutes, total flared volume was 986 MSCF.
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Production Optimization Team Leader
bp Exploration AK, Inc
(907) 659 -4472
I. of I 6/25/2006 9:1 I AM
1. Facility Number
0290000029
2 Facility Name
PBU FS 2
3. Field
4. Operator
BP
lb. MontNYgr et OlapoaNion
July -2006
PBU - EOA
Disposition
Volume MCF
6'
20. For production from multiple pods, list contribution of each pool as a percent of
Total Volume
G. Sold
0
Pod Name
Pod Code
Percent
T Reinjected
0
PRUDHOE
640150
100.00%
8. Flared or vented 1 hour or less
4,401
1 hour (see Ygtr.)
799 /
9. Flared or vented more than
10. Riot and Purge
19 206 ✓
11. Used for lease operations (specify in Remarks)
640,782
Auliorization
MCF
12. Odor (see lntuctions)
0
>1 hr.
Safety
13. TOTAL VOLUME (ITEMS 5-12)
665,188
Lease Use
MCF
14. NGL Gas Equtvatent
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
18. Transterrsd from: CGF
284,076
G e d"/ q . D L
17. Transferred to: (Express as a negative 1) CGF
- 1 4,045,469
18, Remarks: Block 11: Fuel Gas = 640,555 mscf and Assist Gas = 227 mscf
I hereby certify that the toregoirp is true and correct 10 the best of my knowledge.
n
G � oti e Manager, Production Taxes and Ro airy
Note: volumes must
corrected to o pressure of f 1 14.. 65 5 psis
and titemperature rltv20 AAC25 2 35. F.
Printed Name Bernard W. Hajny Phone (907)564-502e Date !J /I 0 6
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
(Unplanned Events less than
or equal to 1 hour
1
DATE TIME _:- VOLUME.: DESCRIPTION OF INCIDENT & CAUSE
7/15/2006 0233 -0323 139 Not required for unplanned events c= 1 hour
7/26/2006 1202- 1234 320
TOTAL
TOTAL
459
'Unplanned Events greater than 1 hour
DATE :4 , TIME . = VOLUME. DESCRIPTION OF INCIDENT & CAUSE__ , . ACTION TAKEN TO EUMINATE CAUSE - - I
7/26/2006 1304 -1437 388 See attachments
7/29/2006 1054 - 1225 411
799
$Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE _. TIME - VOLUME DESCRIPTION OF INCIDENT & CAUSE..,_,
7/15/2006 0116-0156 3,942 See attachments
TOTAL
3,942
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME .. VOLUME DESCRIPTION DESCRIPT OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE ,,
. a
See attachments
TOTAL
0
TOTAL
Unplanned Events c 1 Hour 459
Unplanned Events> 1 Hour
Planned Events c 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hours
exceeding 5,000 MCF
IlleNtl 19 ,206
Assist 227,
TOTAL FLARED VOLUME 24,633
Pilot Purge
799
3,942
0
See attachments
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS -2
GAS FLARING INCIDENT REPORT
July 2006
ACTION TAKEN TO ELIMINATE CAUSE
Not required tor unplanned events which
See attachments
1
ACTION TAKEN TO EUMINATE CAUSE .;
See attachments
Pape 1
&x9/2006
2:04 PM
FACILITY: FS2 DATE: 15 Jul 2006
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:16 01:56 OHrs 40Mins ❑ ❑ ® 3,942 MSCF
2. Flare/Relief Valve 02:33 03:23 OHrs 50Mins ❑ ❑ ❑ 139 MSCF
TOTAL VOLUME 4,081 MSCF
First Determination of Cause:
1. DEPRESSURED COMMON LINES 9 -B +9 -E FOR PSV WORK
2. FLARED OFF THE SLUG CATCHERS DUE TO TC -1803 S/D FOR
MAINTENANCE
Action Taken to Stop Flaring:
1. FINISHED DEPRESSURING
REPORT NO: 06-0329
2. SHUT IN MORE PRODUCTION TO ALLOW FOR A SINGLE COMPRESSOR OPERATION
Monday, July 31, 2006 Page 1 of 1
C7�
FACILITY: FS2 DATE: 26 Jul 2006
Action Taken to Stop Flaring:
1. S1 4 -23
REPORT NO:
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING
2. Lost 1801 STV /IP compressor due to high IP discharge temp.
2. Attempted two starts on 1801, sequence stop on IP seal oil dP and then STV brg vibrations.
Started 1802 after two failed attempts due to balance line high flow.
06 -0359
Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 12:02 12:34 0Hrs 32Mins 8 ❑ ❑ 320 MSCF
2. Flare/Relief Valve 13:04 14:37 1 Hrs 33Mins Q ❑ ❑ 388 MSCF
TOTAL VOLUME 708 MSCF
First Determination of Cause:
1. Flared off slug catchers due to LPS system over pressure with ambient temp increase and well
swap.
Monday, July 31, 2006 Page 1 of 1
FACILITY: FS2 DATE: 29 JUI 2006
First Determination of Cause:
1. Lost 1802 STV /IP comp on HH IP discharge temp.
REPORT NO: 06-0368
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 10:54 12:25 1 Hrs 31 Mins ❑ ❑ ❑ 411 MSCF
TOTAL VOLUME 411 MSCF
Action Taken to Stop Flaring:
1. Started 1801 STV /IP compressor after trouble shooting start problems. Flare duration exceeded 1
hr.
Monday, July 31, 2006 Page 1 of 1
GPO Flaring
Subject: GPB Flaring
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
Date: Thu, 27 Jul 2006 12:49:37 -0800
To: steve_mcmains @admin.state.ak.us
CC: "GPB, Environ TL" <GPBEnvimnTL@BP.com >, "GPB, Environ Advisor East"
<GPBEnvironAdvisorEast@BP.com>, "Fiedler, Anne M" <Anne.Fiedler@BP.com>, "Benson, Gary "
A" <Gary.Benson@BP.com >, "Pfeiffer, Jim A" Qim.Pfeiffer@BP.com>, "GPB, FS2 /COTU Area
Mgc$wsFS2' 8I " ., "GPS, F52 0 04 ..,...;'
To: Steve McMains, AOGCC
steve_mcmains @admin.state.ak.us
907 - 793 -1241, fax 907- 276 -7542
From: Mike Bolkovatz, Prod Optimization Team Leader (907 - 659 -5566)
An extended flaring event occurred at FS2 on July 26. The cause was the unplanned shutdown of the
STV /IP compressor, 1801, due to high discharge temperature at 1300 hours (the ambient temperature
rose from the low 50's and peaked at over 70 deg). System flaring began at 1304 hours and ended at
1437 hours. Two attempts were made to restart the 1801 machine, the first failed to sequence due to a
low differential pressure on the IP seal oil system and the second was caused by high vibration on the
STV compressor. Three attempts were required to get the standby machine, 1802, online. The first
two attempts failed to sequence due to errant high balance line flow indication on the STV, the third
attempt was successful, the unit was loaded, and flaring ended after 93 minutes. Total flared volume
was 388 MSCF.
If you require additional information, please don't hesitate to call me.
Michael Bolkovatz
GPB Production Optimization Team Leader
bp Exploration AK, Inc
(907) 659 -5566
I of 1 7/27/2006 2:44 PM
GPB Flaring
Subject: GPB Flaring
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
Date: Sun, 30 Jul 2006 09:28:46 -0800
To: steve_mcmains@admin.state.ak.us
CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB, Environ Advisor East"
<GPBEnvironAdvisorEast@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary
A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A" <iim.Pfeiffer@BP.com >, "GPB, FS2 /COTU Area
Mgr" "GPB, FS2 OpeLid (3PBFS2Op"sLf1S °.
To: Steve McMains, AOGCC
steve_mcmains @admin.state.ak. us
907 - 793 -1241, fax 907-276-7542
From: Mike Bolkovatz, Prod Optimization Team Leader (907 - 659 -5566)
An extended flaring event occurred at FS2 on July 29. The cause was an unplanned shutdown of
STV /IP compressor 1802 due to high discharge temperature (the ambient temperature rose from the low
50's and peaked at over 65 deg during this time). System flaring began at 1054 hours and ended at
1225 hours (91 minutes). Several attempts to start the backup compressor 1801 resulted in flaring over
1 hour. Total flared volume was 411 MSCF.
If you require additional information, please don't hesitate to call me.
Michael Bolkovatz
GPB Production Optimization Team Leader
bp Exploration AK, Inc
(907) 659-5566
I ofI 7/31/2006 7:12 AM
PBU FIELD SHUT DOWN
EXCESSIVE FLARING EVENT
(FS -II
S -3, GC -2 & GC -3)
`AUGUS _ SEPTEMBER NOVEMBER
August & September 2006 the PBU field was shut down for an oil pipeline that was either cracked or corroded.
The Gas Disposition Facilities at PBU had excessive flaring for the 2 months because of the field being shut down.
A determination or hearing is being considered to determine if this excessive flaring of gas is a waste of resources
for each month.
Currently the agency has entered into the Gas Disposition database the data reported by the operator until AOGCC
makes a determination of the excessive gas flared. At this time, the agency has not made a determination as to the
status for the gas flared. Once a determination or hearing is completed the signed reports will be inserted in place
of the current report. The database will be revised and procedures handled properly to correct this gas disposition
excessive flaring event.
This page will be entered into each Gas Disposition Facility folder for the 2 months of excessive flaring until this
situation is corrected. This page will be removed along with the duplicate reports when the final determination is
made.
1 Facility Hunter
0290000029 � PBU
2. Facility Name
FS 2
3. Field
PBU - EOA
d. Operator I. Mont/Yalu of Disposition
BP August -2006
Disposition
Volume MCF
20. For induction from maidple pools. Yu conatudon M *an pod n • percent of
Total Wane.
S. Sad
0 •
Pod Name
Pod Code
Percent
7 Rennin
0
PRUDHOE
640150
100.00%
9. Flared or vented 1 hour of bas
4
1 tour (see war.)
1,158
9. Flared or vented more then
10. Rol and Purge
19,175
11. Used for lease operation (specify in Remarks)
356,956
i
Authorization >1 hr.
Sat sty
MCF
12. Ottat (see instructions)
0
13. TOTAL VOLUME (ITEMS 5-12)
377,293
Lease Ues
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
167,395
Commissioner Wb
113. Trans*rod from. CGF
17. Transferred o: (Express as a negative a) COF
-4,683,622
15. Remarks; Block 11: Fuel Gas = 353,670 mscf and Assist Gas = 3,286 tract
1 hereby csNly that the egoing is the and the best Of my knowledge.
The Manager, Production Taxes and Royalty
Sgnature
Note: All volumes must be
competed to pressure of 14.66 psis
and to a temperature of 60o F.
Aldhrontv 20 AAC25.295.
Printed Name Bernard W. Hajny Ptnie (907)584-5028 Date 9 /y' ab
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT • FS-2
GAS FLARING INCIDENT REPORT
August 2008
(Unplanned Events Mss than or equal to 1 hour
DATE ,p ma VOLUME,. 0eSCRi'nON0FINcIDENT &CAUSE_ a , ACTIDNTAIDINTO B/►tUTEOADM- ,z:
8/8/2006 0849-0933 4 Not required for unplanned events <= 1 hour Not required for unplanned events which
TOTAL 4
'Unplanned Events greater than 1 hour
a DATE TIME - �,,„,_ VOLUME. DESCRIPTION OF INCIDENT & CAUSE ACTION TAKBiT° MASTS CAUSL_",,,,,
8/4/2006 0804 -1207 1,012 See attachments See attachments
8/6/2006 0700 -1430 146
TOTAL 1,158
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met 1
DATE TIME VOLUNIE DESCRIPTION OF INCIDENT & CAFE ACTION TAKEN TO ELBENAVECAISE ..,_,.
See attachments See attachments
TOTAL 0
(Planned Events Exceeding 1 Hour OR Exceedln$ 5000 Mcf '
DATE. TII VOLUME, DE9t P 1ON OF INCWENT a CAUSE ACTION TARN TO ELIMINATE GUS
See attachments See attachments
TOTAL 0
TOTAL
Unplanned Events c 1 Hour 4
Unplanned Events > 1 Hour 1,158
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Event > 1 has or 0
exceeding 5,000 MCF
Peot Purge WO 10.17E
Assist g,E
TOTAL FLARED VOLUME 23,623
Pape 1
&82006
4:63 PM
t>
FACILITY: FS2 DATE: 04 Aug 2006
REPORT NO:
BPXA FLARE REPORT
PRUDHOE BAY
06 -0377
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 08:04 12:07 4Hrs 3Mins ❑ ❑ ❑ 1,012 MSCF
TOTAL VOLUME 1,012 MSCF
First Determination of Cause:
1. Lost 1801 STV /IP compressor on phantom shutdown, it would not restart. 1802 STV /IP compressor
had limit swich trouble and would not start.
Action Taken to Stop Flaring:
1. Cycled power to 1801 control system off and on, and worked on the bad limit switch on 1802. 1801
was then restarted.
Monday, August 28, 2006 Page 1 of 1
FACILITY: FS2 DATE: 06 Aug 2006
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/ReliefValve 07:00 14:30 7Firs 30Mins ® ❑ ❑ 146 MSCF
TOTAL VOLUME 146 MSCF
First Determination of Cause:
1. Plant S/D for sales line isolation. STV /IP compressor S/D on low flow.
REPORT NO: 06-0381
Action Taken to Stop Flaring:
1. Secured plant and isolated sales line. STV /IP flare intermittent while securing plant. Regen
stripping gas for TEG conditioning eventually cut back to stop Kaldair flare.
Monday, August 28, 2006 Page 1 of 1
V
Subject: GPB Flaring
From: " GPB, Prod Opt TL" <GPBProdOptTLQBP.com>
Date: Sat, 05 Aug 2006 07:15::.339 -0800
l . .me 'statleak.us •.. -.X f ,y g': . ;.; ¢y ."
9r '"GPB, Iknoskan, T ` BEnvi ouTLjBP.cons>, "GPB, Environ `fit''
"Fiedler, Anne M" <Amne.Fiedier .co >, "Benson,
a ° , "Pfaff Jilin A" Cim2feiffer taoige s �E 'FS2/e0 ll
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 - 793 -1241, fax 907- 276 -7542
From: Michael Bolkovatz, Prod Optimization Team Leader (907 -659 -5566)
An extended flaring event occurred at FS2 on August 4. The cause was an unplanned shutdown of
STV /IP compressor 1801 due to a hydraulic leak which leaked fluid into the control panel. Attempts to
start the backup compressor (1802) as a contingency were unsuccessful due to a valve limit switch
problem. The online compressor (1801) shutdown for an undetermined reason during the time
operations was trying to start 1802. This resulted in parallel troubleshooting efforts to try to get one
machine started. STV /IP compressor 1801 was successfully restarted after cycling the power to the
control unit. System flaring began at 0804 hours and ended at 1207 hours (243 minutes). Total flared
volume was 1012 MSCF.
If you require additional information, please don't hesitate to call me.
Michael Bolkovatz
GPB Production Optimization Team Leader
bp Exploration AK, Inc
(907) 659-5566
1 of 1 8/7/2006 7:39 AM
1. Facility Number
0290000029
2 Facility Name
PBU FS 2
1 Field
PBU - BOA
4 Operator
BP
5 MonttYear of Disposition
September - 2006
Disposition
Volume MCF
20. For production from multiple pools, list oonmbution of ear* pool as a percent of
Total Volume
8 Sold
0
Pool Name
Pool Code
Percent
7. Reinjected
0
PRUDHOE
840150
100.00%
8. Flared or vented 1 hour or less
13
9. Flared or vented more than 1 Hour (see Instr.)
0
10. Plot and Purge
18,574
11. Used for lease operations (specify in Remarks)
313,588
12. Other (see Instructions)
0
Authorization >1 hr.
Safety
MCF
13. TOTAL VOLUME (BEMS &12)
332 175
Lease Use
MCF
14. NGL Gas Epivalent
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
16. Translened from: CGF
164,321
Commissioner Data Data
17. Tr
Transferred to: (Express as a negat negative 0) CGF
3,304,349
18. Remarks: Block 11: Fuel Gas = 313,446 mscf and Assist Gas = 142 mscf
t hereby certify that the for ng best of my knowledge.
Title Manager, Production Taxes and Royalty
77J
Note: All volumes must be
corrected to pressure of 14.85 pal.
and ut a Authority AAA of 650 F.
AuthoAty ZO MC25.235.
Printed Name Bernard W. Hajny Phone (907)564 -5029 Dare O
/ '-/�— ere
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
I
'Unplanned Events less than or equal to 1 hour
VOLUME: DESCRIPTION OF INCIDENT & CAUSE . ACTION TAKEN TO ELIMINATE CAUSE
10 Not required for unplanned events c= 1 hour Not required for unplanned events which
1
2
13
DATE ,_ TIME
9/3/2006 2002 -2050
9/4/2006 0111 -0119
9/4/2006 0210 -0239
TOTAL
1
'Unplanned Events greater than 1 hour
- =
DATE,,- TIME, . VOLUME DESCRIPTION OF INCIDENT & CAUSE ; � ACTION TAKEN TO ELIMINATE CAUSE_ „. .
See attachments
TOTAL
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mci
VOLUME.., DESCRIPTION OF INCIDENT & CAUSE_ . ACTION TAKEN TO ELIMINATE CAUSE
See attachments
DATE _. TIME._
TOTAL
0
0
TIME
TOTAL
Unplanned Events < 1 How
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Plarxted Events > 1 hour or
exceeding 5,000 MCF
Piot Purge 15,5741
MINN 14 2I
18,729
DATE
Assist
TOTAL FLARED VOLUME
0
a TOTAL
13
0
0
0
See attachments
See attachments
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-2
GAS FLARING INCIDENT REPORT
September 2006
See attachments
1
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mci
VOLUME,__ DESCRIPTION OF INCIDENT & CAUSE_ _ ACTION TAKEN TO ELIMINATE CAUSE,„.„,„..„,„
See attachments
Pape t
10/11/2008
4:03 PM
0290000029 12. Facility Number
2. Facility Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
BP
3. Month/Year d Ospoolaen
October -2006
Disposition
Volume MCF
/
20. For production Iran multiple pods, list contriputlon of Nth pool all • Peron oI
Total Volume.
8. Sold
0
Pod Name
Pod Code
Percent
7 Reinjected
0
PRUDHOE
640150
100.00%
8. Flaredot vented 1 hour or less
0
1 hour (see Instr.)
7,571
9 Flared or vented more than
10. Rot ant Purge
19,681
11. Used for lease operations (specify In Remarks)
492,638
12. Oder (see inshuctk s)
0
Authorization >1 hr.
Safety
7 S��
MCF
13. TOTAL VOLUME (ITEMS 6-121
519,890
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Puchasedgas
0
Waste: :
MCF
16. Transferred from: CGF
217,281
�
(1'(�{./ /J /
( TTYa "`
all, /_ - ' /2 ��� C
17. Transferred to: (Express as a negative 0) CGF
- 11,653,927
18. Remarks: Block it: Fuel Gas = 492,635 ttscf and Assist Gas = 3ltscf
I hereby certify that Me, foregoeq five c tract to the best at my knowledge.
Signature roe Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to etemperature
20 AAC 25. 235. F.
Authority 20 AC5.
l
Printed Name Bernard W. Hajny Phone (907)564 -5028 Dare / _ / 7 -eb
!J � !
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
I
(Unplanned Events Tess than or equal to 1 hour
DESCRIPTION OF INCIDENT & CAUSE
DATE
DATE
10/2/2006
10/6/2006
10/13/2006
10/14/2006
10/23/2006
10/30/2006
DATE
TIME
TOTAL
1530 -1720 229
1742 - 1905 340
1000 -1850 736
1030 -2400 28
0000 -2030 123
TOTAL
TIME
TOTAL
VOLUME
0
2,461
0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
10/6/2006 1257 -1430 194 See attachments
10/7/2006 0103 -0800 1,448
10/7/2006 0930 -1128 410
10/7/2006 1357 -2000 1,260
10/21/2006 1307 -1730 1,046
19/06 1730 -2400 752
TOTAL 5,110
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-2
GAS FLARING INCIDENT REPORT
October 2006
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events <= 1 hour Not required for unplanned events which
Page t
1
'Unplanned Events greater than 1 hour
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSEw;,mpmo ACTION TAKEN TO EUMINATE CAUSE
0100 -0947 1,005 See attachments See attachments
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
VOLUME DESCRIPTION OF INCIDENT & CAUSE � , , .. , ACTION TAKEN TO EUMINATE CAUSE d . ,. s . ,, ..;
See attachments See attachments
DATE TIME VOLUME . DESCRIPTION OF INCIDENT & CAUSE„ a ,., w , ; , ; , ACTION TAKEN TO ELIMINATE CAUSE , k 1, ,,,
See attachments
11/9/2006
10:37 AM
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 2,481
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 5,110
exceeding 5,000 MCF
Pilot Purge ma 19,881
Assist SSW 3
TOTAL FLARED VOLUME 27,255
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT • FS -2
GAS FLARING INCIDENT REPORT
October 2006
Page 2
11/9/2006
10:37 AM
by
FACILITY: FS2 DATE: 06 Oct 2006
First Determination of Cause:
1. Water Washing 1803 Frame 5 turbine
REPORT NO: 06 -0580
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Controlled Blowdow 12:57 14:30 1 Hrs 33Mins ❑ ❑ F]I 194 MSCF
2. Flare/Relief Valve 15:30 17:20 1 Hrs 50Mins ❑ ❑ ❑ 229 MSCF
TOTAL VOLUME 423 MSCF
2. 1803 gas compressor shutdown, controls/turbine trouble
Action Taken to Stop Flaring:
1. Stopped when Water Wash was completed on 1803
2. Restarted 1803 gas comprssor, after trouble shooting.
Thursday, November 02, 2006
Page 1 of 1
�
FACILITY: FS2 DATE: 07 Oct 2006
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Controlled Blowdow 01:03 08:00 6 Hrs 57Mins ❑ ❑ W 1,448 MSCF
2. Controlled Blowdow 09:30 11:28 1 Hrs 58Mins ❑ ❑ 410 MSCF
3. Controlled Blowdow 13:57 20:00 6 Hrs 3Mins ❑ ❑ .J 1,260 MSCF
TOTAL VOLUME 3,118 MSCF
First Determination of Cause:
1. DEPRESSURED CL16/17C FOR BLINDING
BPXA FLARE REPORT
PRUDHOE BAY
2. Water washing 1804 gas compressor for maintance.
3. Depressured CL 17D for blinding of 17C.
Action Taken to Stop Flaring:
1. FINISHED DEPRESSURING
2. Finished water washing of 1804 gas compressor.
3. Finished Depressuring.
REPORT NO: 06-0581
Thursday, November 02, 2006 Page 1 of 1
Flare Start Date 10/1/2006
Flare End Date 10/31/2006
FS2 Flare Report
Time Of Flaring
Report Number Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By
Volume (MSCF)
System
06-106 Flare Relief 102/2006 1:00:00 AM 9:47:00 AM 527 minutes No No No BP1\RODGC1
Determination Cause Depressured Commonline 16/17 C M preparation for pigging. Line
allowed to float on flare header pressure while doing final prep
resulting in the extended duration.
Action Taken
Generated 11/22006
Line was energy isolated for launcher and receiver installation.
06 -91 Flare Relief 10/13/2006 5:42:00 PM 7:05:00 PM 83 minutes No No No BP1\PAINTEER
Determination Cause Depressure C/L 16D to inspect corrison
Action Taken Stopped depressuring 16D
Total Volume
MSCF)
4224
1005
Daily Volume (MSCF) 1005
340
Daily Volume (MSCF) 340
06-96 Flare Relief 10/142006 10:00:00 AM 6:50:00 PM 530 minutes No No No BP1 \WILLIA44 736
Determination Cause STV - TO XXXX unloaded due to low gas rates.
Action Taken Loaded STV/IP T /C.
Daily Volume (MSCF) 736
Page 2 of 3
Flare Start Date 10/1/2006
Flare End Date 10/31/2006
06-114 Controlled BkAWown 10/21/2006 107:00 PM 5:30:00 PM - 283 minutes No No Yes 8P1\OWENSJN
1046
06-129 Omer
Determination Cause DEPRESSURED CL16/17C FOR MAINTENANCE
Action Taken COMPLETED DEPRESSURING
06 -118 Other 10/23/2006 10:30:00 AM 1200:00 AM 810 minutes No No No BP1 \RALPHJM
Determination Cause Commonline depressuring for pig launcher and receiver Installations.
Commonline floating on the flare to maintain line in depressurized
condition tor installations.
Action Taken
Fs Z F p0
P PS. --1p
Continueing for line work.
10/29/2006 5:30:00 PM 12:00:00 AM 390 minutes No No Yes BPI\RALPHJM 752
Determination Cause Depressured 16 C C/L for blinding. Purge header lined to flare for
Winding.
Action Taken
Purge treader lined to flare for blinding.
08.134 Other 10/30/2006 12:00:00 AM 8:30:00 PM 1230 minutes No No No BP1 \RALPHJM
Determination Cause Lined inlet purge header to flare and staged HPAP candles open to
prevent pressure build -up on purge header for Winding of C/L 16//17 C.
Small volume of Nock valve leakage flared to HP candles along with
Action Taken the daily leakage from PSV and flare control valves while candles were
Wan.
Completed blinding of commonline and blocked to purge header to
flare.
Daily Volume (MSCF) 1046
28
Daily Volume (MSCF) 28
Daily Volume (MSCF) 752
123
Daily Volume (MSCF) 123
Total Volume _42e4—
MSCF)
L{ 0'3 o
Generated 11/2/2008 Page 3 of 3
RE: GPB Gas Flaring Incideni
Subject: RE: GPB Gas Flaring Incident
From: "GPB, Prod Opt TL" <GPBProdOptTL®BP.com>
Date: Mon, 09 Oct 2006 17:15:56 -0800
To: "GPB, Prod Opt TL <GPBProdOptTL@BP.com >, "steve mcmains@nadmin.state.ak.us"
lesteve mcmains@admin.state.ak.us'>, "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB,
Environ Advisor East" <GPBEnvironAdvisorEast@BP.com >, "Fiedler, Anne M"
rAnne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson@BP.com >, "Pfeiffer, Jim A"
lim.Pfeiffer@BP.com>, "GPB, FS2/COTU,Area Mgr" <GPBFS2TL@BP.com>, "GPB, FS2 Ops
Lead" <GPBFS2OpsLead@,BP.c om >, "GPB, FS3 Area Mgr" <GPBFS3TL@BP.com>, "GPB, FS3
Ops Limed " RP
To Steve McMains, AOGCC
steve_mcma i ns @ad mi n. state. a k. us
907 - 793 -1241, fax 907- 276 -7542
From: Dwight Warner, GPB Field Optimization Engineer
for Hal Tucker /Mike Bolkovatz GPB Prod Optimization Team Leaders
Flaring events related to depressurizing common lines, pigging, shut downs,
restarts and water washing.
• FS2 event occurred on October 2nd starting at 01:00 and lasted 8 hrs
47 mins, total volume flared was 1,005 MSCF. Depressured common
line 16/17C in preparation for pigging. Line allowed to float on flare
header pressure while doing final preparation resulting in the extended
duration.
• FS3 event occurred on October 5th starting at 09:04 and lasted 1 hr 11
mins, total volume flared was 120 MSCF. 1804 tandem compressor had
2 compressor blow downs during trip and restart.
• FS3 event occurred on October 5th starting at 09:04 and lasted 1 hr 11
mins, total volume flared was 644 MSCF. 1804 tandem compressor shut
down on a speed control power fault.
• FS2 event occurred on October 6th starting at 12:57 and lasted 1 hr 33
mins, controlled blow down total volume was 194 MSCF. Water washing
1803 Frame 5 turbine
• FS2 event occurred on October 6th starting at 15:30 and lasted 1 hr 50
mins, total volume flared was 229 MSCF. 1803 gas compressor shut
down due to controls /turbine trouble.
• FS2 event occurred on October 7th starting at 08:00 and lasted 6 hrs 57
mins, controlled blow down total volume was 1,448 MSCF. Depressured
CL 16/17C for blinding.
• FS2 event occurred on October 7th starting at 09:30 and lasted 1 hr 58
1 of 2 10/10/2006 7:57 AM
RE: GPB Gas Flaring Incident
mins, controlled blow down total volume was 410 MSCF. Water washing
1804 compressor for maintenance.
• FS2 event occurred on October 7th starting at 20:00 and lasted 6 hrs 3
mins, controlled blow down total volume was 1,260 MSCF. Depressured
CL 17D for blinding of 17C.
If you require additional information, please don't hesitate to call me.
Dwight Wamer
GPB Field Optimization Engineer
(907) 6594382
for
Hal Tucker /Mike Bolkovatz
GPB Prod Optimization Team Leader
(907)- 659 - 447215566
2of2 10/10/2006 AM
PBU FIELD SHUT DOWN
EXCESSIVE FLARING EVENT
(FS- 14A-2 S -3, GC -2 & GC -3)
AUGUST SEPTEMBER (NOVE. BER
August & September 2006 the PBU field was shut down for an oil pipeline that was either cracked or corroded.
The Gas Disposition Facilities at PBU had excessive flaring for the 2 months because of the field being shut down.
A determination or hearing is being considered to determine if this excessive flaring of gas is a waste of resources
for each month.
Currently the agency has entered into the Gas Disposition database the data reported by the operator until AOGCC
makes a determination of the excessive gas flared. At this time, the agency has not made a determination as to the
status for the gas flared. Once a determination or hearing is completed the signed reports will be inserted in place
of the current report. The database will be revised and procedures handled properly to correct this gas disposition
excessive flaring event.
This page will be entered into each Gas Disposition Facility folder for the 2 months of excessive flaring until this
situation is corrected. This page will be removed along with the duplicate reports when the final determination is
made.
Facility Number
0290000029
I1. 2. Facility Name
PBU FS 2
PBU
3. Fie
PBU - EGA
PBU
Op Month/Veer of Disposition
BP December -2006
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pod es a pint of
Total Vdtans.
G. Sold
0
Pod Name
Pod Code
Percent
7. Reinjected
0
PRUDHOE
640150
100.00%
8. Flared or vented l haw or less
17,000
9. Flared or vented more than 1 four (see t*)
0
t0. Pilot and Purge
18,801
11. Used for lease operations (specify In Remarks)
728297
.. ..
.
12. Other (see instructions)
0
Authorization >1 M:
Satiny
MCF
13. TOTAL VOLUME (ITEMS 612)
764,098
Lease Use
MCF
14. NGL Gas Emavelsnt
0
Conservation
MCP
15. Purchased gas
0
Waste:
MCF
ie. Transte,md hoar COP
305,122
Commissioner Date
17. Transferred to: (Emmett as a negative s) CGF
- 19,715,198
18. Remarks: Block 11: Fuel Gas = 728,297 mu( and Assist Gas = 0 mac(
i hereby certify that the foregoing
Signature
is true ere best of my knowledge.
Tae Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 pale
and to a temperature of 60o F.
Authority 20 AAC25.235.
/y
Printed Name Bernard W. Hajny Phone (907)564-5028 oaro� 6 - �
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1
(Unplanned Events less than or equal to 1 hour
VOLUME DESCRIPTION OF INCIDENT & CAUSE ,,,,,, ACTION TAKEN TO ELIMINATE CAUSE
17,000 Not required for unplanned events c= 1 hour Not required for unplanned events which
DATE TIME
12/30/2006 1807 -1843
TOTAL
1
(Unplanned Events greater than 1 hour
TIME m.ffhnator VOLUME„ DESCRIPTION OF INCIDENT & CAUSE, :,,„ .,
See attachments
Loin DATE - 4 ,
TOTAL
rznm DATE,wmrrnmrtxei<n; TIME
TOTAL
TOTAL
17,000
0
1
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
VOLUME w. DESCRIPTION OF INCIDENT & CAUSE
See attachments
0
8P EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS - 2
GAS FLARING INCIDENT REPORT
December 2006
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE yN:, TIME „;µ, VOLUME, DESCRIPTION OF INCIDENT do CAUSE4,0
See attachments
0
TOTAL
Unplanned Events < 1 Hour 17,000
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge a 18,804
Assist 01
TOTAL FLARED VOLUME 35,801
r;
Page 1
Si
„ ACTION TAKEN TO ELIMINATE CAUSE flaw"
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUS
See attachments
1/11/2007
4:45 PM