Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPrudhoe Bay Unit GC 1 / BPSTATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2006 FACILITY: PBU GC 1 OPERATOR: BP EXPLORATION t. Facility Number 0290000031 2 Facility Name PBU GC 1 3 Field 4. Opera Month/Year of Diepdagdn BP January PBU - WOA Disposition Volume MCF / V 20. For production from multiple pods, list conbibutbn of eadl pod s • paona of Total Volume. e. Sow 0 Pod Name Pod Code Percent 7� 0 PRUDHOE 640150 98.07% LISBURNE 640144 0.00% 9 Flared or vented1 nw or less 20738 MIDNIGHT SUN 640158 0.51% PT MCINTVRE 640180 1.42% 9 Flared or vented more than 1 hour (see nstr.) 15,625 10. Rot and Rigs 51,453 • 11. Used for bas operations (specify in Remarks) 938,032 12. Other (see nstnktlonS) 0 Authorization >1 hr. safety ISp62 — MCF 13. TOTAL VOLUME (REMS 6-12) 1,025,848 Leas Use MCF 14. NGL Gas Equivalent 0 Coneenation MCF 15. Purchased gas 0 Waste: MCF 16. TratWsned fmrm ° / � S�0 -i0 / Commissioner Debt (Express as 17. Transferred to: (Expre a negative at CGF - 62,637,413 1 8. Remarks: Block I L Fuel Gas = 938,032 rnscf and Assist Gas = 0 rnscf I hereby celery that the foregoing its Signature is true and correct to the best of my knowledge. /� rata Manager, Production Taxes and Royalty corrected to pressure of 14.65 psis horcity ity 20 AAC 25235. Note: AB volumes must be and s 0 F. Authority AC5. ll dC.,, vv�� / Printed Narne Bernard W. Hajny Phone (907)564 -5028 Date 1 2.-•"" j c — O /,ta STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Form 10-422 Rev. 1/2004 Submit in Duplicate 20,738 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT January 2006 1 (Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 1/18/2006 0110 -0208 1,208 Not required for unplanned events which 1/18/2006 0116 -0159 1,792 are less than or equal to 1 hour 1/18/2006 2336 -2359 80 1/21/2006 0026 -0045 1,319 1/21/2006 0412 -0419 243 1/21/2006 0653 -0658 1,910 1/22/2006 1625 -1640 2,208 1/22/2006 2049 -2112 3,194 1/26/2006 1319 -1418 8,194 1/26/2006 2211 -2218 73 1/28/2006 1132 - 1158 361 1/29/2006 2107 -2122 156 TOTAL ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour 'Unplanned Events greater than 1 hour 1 TIME „,„. VOLUME DESCRIPTION OF INCIDENT & CAUSE. .<.". DATE 1/1/2006 0001 -2400 5,996 See attachments 1/2/2006 0001 -2400 1/3/2006 0001 -1050 1/10/2006 1838 -2020 1/19/2006 0000 -0330 5,996 2,704 200 729 TOTAL 15,625 ACTION TAKEN TO ELIMINATE CAUSE .. r . See attachments Pape 1 2/8/2006 9:34 AM !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 DATE DATE Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TIME. , _ . . VOLUME., DESCRIPTION OF INCIDENT & CAUSE r ,,, ; , �,,. ACTION TAKEN TO EUMINATE CAUSE....,,, See attachments See attachments TOTAL (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ! TIME TOTAL VOLUME 0 0 TOTAL Unplanned Events c 1 Hour 20,738 Unplanned Events > 1 Hour 15,625 Planned Events c 1 hour and not 0 exceeding 5,000 MCF i 51453! ✓ 87,816 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT January 2006 DESCRIPTION OF INCIDENT & CAUSE. See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments 2/8/2006 9:34 AM 6 FACILITY: GC1 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:01 24:00 23 Hrs 59Mins ❑ ❑ ❑ 5,996 MSCF TOTAL VOLUME 5,996 MSCF First Determination of Cause: 1. Annex flare knock out repair. REPORT NO: 06 -0001 BPXA FLARE REPORT PRUDHOE BAY DATE: 01 .Jan 2006 Action Taken to Stop Flaring: 1. Repairng ASAP to return to normal gas rates. Any clarification needed contact GC1 area manager. Monday, January 23 2006 Page 1 of 1 FACILITY: GC1 DATE: 02 Jan 2006 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME First Determination of Cause: 1. Annex flare knock out repair REPORT NO: 06 -0003 BPXA FLARE REPORT PRUDHOE BAY 1. Flare/Relief Valve 00:01 24:00 23 Firs 59Mins ❑ ❑ ❑ 5,996 MSCF TOTAL VOLUME 5,996 MSCF Action Taken to Stop Flaring: 1. Repairng ASAP to return to normal gas rates. Any clarification needed contact GC1 area manager. Monday, January 23, 2006 Page 1 of 1 15 FACILITY: GC1 DATE: 03 Jan 2006 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:01 10:50 10Hrs 49Mins ❑ ❑ ❑ 2,704 MSCF TOTAL VOLUME 2,704 MSCF First Determination of Cause: 1. Annex flare knock out repair. BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 06-0006 Action Taken to Stop Flaring: 1. Repairng ASAP to return to normal gas rates. Any clarification needed contact GC1 area manager. Monday, January 23, 2006 Page 1 of 1 D FACILITY: GC1 DATE: 10 Jan 2006 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 18:38 20:20 1 Hrs 36Mins 0 ❑ ❑ 200 MSCF TOTAL VOLUME 200 MSCF First Determination of Cause: 1. Depressure F -pad HP flowlines. BPXA FLARE REPORT PRUDHOE BAY Action Taken to Stop Flaring: 1. No response taken as this was deemed to be of short duration. REPORT NO: 06 -0017 Monday, January 23, 2006 Page 1 of 1 FACILITY: GC1 DATE: 19 Jan 2006 BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 06 -0040 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:00 03:30 3 Hrs 30 Mins ] ❑ ❑ 729 MSCF TOTAL VOLUME 729 MSCF First Determination of Cause: 1. Sk -18 IP compressor losing bite due to controtinstrumentation failure. Action Taken to Stop Flaring: 1. No response was taken initially as this was deemed to be of short duration. EOA and WOA had to eventually cut wells equaling 100 MMSCFD to stop the flaring. Monday, January 23, 2006 Page 1 of 1 • FW: GPB Flaring Subject: FW: GPB Flaring From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> Date: Wed, 04 Jan 2006 09:42:53 -0900 To: steve_mcmains@admin.state.ak.us CC: "Kurz, John" <john.kurz@BP.com >, "GPB, GCl Area Mgr" <GPBGClTL@BP.com>, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com >, "Fiedler, Anne M" <Anne.Fiedler @BP.com >, "Benson, Gary A" <Gary.Benson @BP.com>,7Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com> , "Bolkovatz, Mike J;_ <BolkovMJQa BP.co - To: Steve McMains, AOGCC steve mcmains @admin.state.ak.us 907 - 793 -1241, fax 907- 276 -7542 From: Hal Tucker, GPB Production Optimization Team Leader GC1 annex flare knockout drum work was completed and oil rate increased sufficiently to allow GC1 IP /LP compressors to load up at 10 :50 AM on January 3. Total flare duration was 12.5 days. Total flare volume was approximately 75.5 MMSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization TL (907) 659 -4472 From. GPB, Optimization Engr Sent: Friday, December 23, 2005 8:10 PM To: ' steve mcmainsradmin.state_ak.ud Cc: Kurz, John; GPB, GC1 Area Mgr; GPB, Environ TL; GPB, Environ Advisor West; Fiedler, Anne M; Benson, Gary A; Pfeiffer, Jim A; Bolkovatz, Mike J; Tucker, Hal E Subject: GPB Flaring To: Steve McMains, AOGCC steve mcmains@admin.state.ak.us 907 - 793 - 1241, fax 907- 276 -7542 From: Dwight Warner, Field Optimization Engineer (907 659 - 4382) for 1 of 2 14/2006 10:51 AM FW: GPB Haring Mike Bolkavatz, Prod Optimization Team Leader (907- 659 -5566) On December 21 during routine corrosion inspection of the HP knock out vessel V -9904 at GC1 -GHX a corrosion tattle tail on the boot connected to the vessel developed a leak. An engineering inspection determined that the equipment must be shut down for repair. The GHX plant was shutdown at 21:00 on December 21. The GC1 plant stayed on line with limited production at -50 mbpd and a gas rate of 1045 mmscfd the normal through put is approximately 100 mbpd and 2.5 bcfpd. This shut down resulted in a lack of IP /LP available gas for compressors K - 105 and K -107 which resulted in back pressure in V -136 which is relieving to the LP system resulting in a clean vertical flare of approximately 6 mmscfd. All potential and controllable options to reduce flare volume have been taken into consideration and acted upon. There are two crews working 24 hours a day to repair the vessel as soon as possible. This requires a safe out and entry into the vessel to inspect the welds that make up the water boot to the vessel. We will not know the duration of the incident until the vessel has been entered and inspected. If you require additional information, please don't hesitate to call me. Dwight Warner - - Acting Prod Optimzation Team Lead GPB Field Optimization Engineer 659 -4382 2 of 2 1/4/2006 10:51 AM Question re GC -I Pilot Purge increase & "WHR" Subject: Question re GC -1 Pilot Purge increase & "WHR" From: "Benson, Gary A" <Gary.Benson @bp.com> Date: Tue, 11 Apr 2006 10:18:35 -0800 To: Stephen Mcmains < steve _mcmains @admin.state.ak.us>, James Regg jim_regg@admin.state.ak.us? Steve & Jim, I got this response from the GC-1 Ops Lead regarding the GC -1 pilot purge increase: ::; "No Flare work was done. The pilot gas was increased due to black smoke, wisping. We are currently max scale, above 480 mscfd. We are reducing that rate down to 400 mscfd immediately. The Rover is aware of this situation and will be monitoring. The plant will also be surveyed to see if we have any PSV's leaking." WHR means "waste heat recovery". Let me know if you need more information. Gary Benson Volume Accounting Greater Prudhoe Bay BP Exploration (Alaska) (907) 564-4604 (907) 564 -4094 fax bensongatbp.com From: Stephen Mcmains [ mailto: steve _mcmains @admin.state.ak.us] Sent: Tuesday, April 11, 2006 7:38 AM To: Benson, Gary A Subject: Re: PBU GC-1 Pilot Purge Increase Gary, What have you found out about this problem. CG -I pilot purge increase in January 2006 and the acronyn for W FIR? We need to complete this ASAP. Steve Benson, Gary A wrote: Thanks for the clarification Jim. I think it was the reference to the July to December 2005 period that threw me off, whereas the flare tip was replaced August 2004. Will get back to you ASAP with a response or to put you in contact with appropriate engineering personnel. 1 of3 4/11/2006 10:41 AM Question re GC -I Pilot Purge increase & "WHR" Gary From: James Regg (mailto:jim regq@admin.state.ak.usl Sent: Wednesday, February 01, 2006 2:10 PM To: Benson, Gary A; Steve McMains Subject: Re: PBU GC -1 Pilot Purge Increase Concern is the trend (continuing increase) of pilot purge gas usage as shown on the plot we attached. If this increasing trend is linked to something specific - e.g., the flare tip changeout - then it would be helpful to know what the usage volume will stabilize at (most other facilities show stabilized rate for pilot -purge gas); if there are other reasons for the increasing trend. we would like to know what they are. Not sure if you were involved in the discussions at FS -3 but it turned out the increasing volumes being reported were finally attributed to leakage past PSVs and the apparent lack of testing and maintenance of those valves. Took some investigating/reviews to get to the real cause. We want to make sure this or similar circumstances are not the case here. Thank you for looking into this; if you prefer, I am available to discuss directly with appropriate facility /engineering personnel. Jim Regg AOGCC Benson. Gary A wrote: Steve & Jim, I've sent a note to the Slope requesting an explanation of the increased pilot purge. Just to clarify, the volume has been in the 44- 45,000 mcf per month range for 2005 until October when it jumped to about 50,000 mcf. So that's a 5 -6,000 mcf per month increase since October, not a 10,000 mcf per month increase since July. Or am I misunderstanding your note below? Gary Original Message From: James Regg [mailto:jim regq @admin.state.ak.ual Sent: Tuesday, January 31, 2006 9:07 AM To: Stephen Mcmains Cc: Benson, Gary A Subject: Re: PBU GC -1 Flaring Increase Here's a graphic illustrating what Steve mentions below; note that this pilot -purge Jim Regg AOGCC Stephen Mcmains wrote: 2of3 4/11/200610:41 AM Question re GC-1 Pilot Purge increase & "WHR" 3 of 3 Gary, Please check this problem with the engineers on the slope. PBU GC -1 flaring from July thru December 2005 shows a large volume increase, an upward trend of over 10,000 mcf for the period. Why the large increase? Does this increase have anything to do with flare tip change out and if it does, what would the future target rate be for the pilot purge at GC -1? Looking back over the recent history (beginning April 2002 thru June 2005), it appears flaring increase 10,000 mcf in a 3 year period and recently there has been that much of an increase again. They had flare tip change out last Summer. Please provide an explanation of the increase flare for this duration and what BP will do to mitigate the problem leading to larger volume flared at GC -1. Steve 4/I1/2006 10:41 AM 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field PBU - WOA 4. Operator 5. MontM'nr of Disposition 'BP February Disposition Volume MCF > > 1 1 20. For production from multiple pools, list contribution of each pool as • percent of Total Vokxne. 6. Sold 0 Pax Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 98.21% LISBURNE 640144 0.04% e. Fixed or vented 1 hour or leas 15,119 MIDNIGHT SUN 640158 0.53% PT MCINTYRE 640180 1.22% 9. Flared or vented more Man 1 how (see Fehr.) 4,979 to. Pilot and Purge 46,050 1 1. Used for base operations (specify fn Remarks) 759,734 Authorization >1 hr Seb 7 4 171 1 !9 MCF 12. Other (see instructions) 0 13. TOTAL VOLUMEQTEM36 -12) 825,882 Lease Use MCF 14. NGL Gas Equivalent 0 Consovation MCF 15. Purchased gas 0 Waste: MCF 18. Transferred Iran: 0 ( ! t �� /��/ " / t'�/ co migione oats 17. Transferred to: (Express as a negative 5) CGF - 61,953,548 t e. Remarks: Block I I : Fuel Gas = 759 734 mscf and Assist Gas = 0 mscf 1 hereby certify that the • egoirg is true a • • • • : (0 1he best of my knowledge. Signature Milo* _ Sm.. Tide Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psla a ut a temperature Authority 0 AAA 5. 60o F. Authnrltv20AAf;M5.235. . Printed Nan Bernard . Hajny Phone (907)564 - 5028 Date -/ > �7 ? l�! /�n Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Hour 1 (Unplanned Events less than or equal to 1 VOLUME 338 163 92 33 535 8,750 496 1,757 2,955 DATE 2/3/2006 2/6/2006 2/6/2006 2/20/2006 2/20/2006 2/21/2006 2/21/2006 2/21/2006 2/27/2006 DATE 2/27/2006 2/28/2006 DATE TIME 0051-0118 2201 -2219 2304 -2326 1721 - 1725 1730 -1744 1842 - 1924 1925 -1959 2124 -2146 0248-0323 TOTAL TOTAL TIME TOTAL TIME TOTAL Unplanned Events e 1 Hour Unplanned Events > 1 Hour Planned Events e 1 four and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Piet Pug. Assist TOTAL FLARED VOLUME 15,119 1 `Unplanned Events greater than 1 hour TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE r2,r. . „�. ACTION TAKEN TO ELIMINATE CAUSE ,,,_,� y 2235 -2400 4,604 See attachments 0001 -0149 375 4,979 1 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT 6 CAUSE See attachments 0 1 `Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE.. . . ACTION TAKEN TO ELIMINATE CAUSE TOTAL 15,119 4,979 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT February 2006 DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments Page 1 3/7/2006 10:17 AM bp FACILITY: GC1 DATE: 27 Feb 2006 TIME OF FLARING SYSTEM Start Stop Duration Intermittent 1. Flare/Relief Valve 02:46 03:23 0 Hrs 37Mins 2. Flare/Relief Valve 22:35 24:00 1 Hrs 25Mins Tuesday, February 28, 2006 REPORT t40: BPXA FLARE REPORT PRUDHOE BAY Black Smoke Planned ❑ ❑ ❑ ❑ First Determination of Cause: 1. LPS compressor K -7000 & K -7001 shut down due to a problem associated with PLC. 2. LPS compressor K -7000 & K -7001 shut down due to a problem associated with PLC. 06 -0104 VOLUME 2,955 MSCF 4,604 MSCF TOTAL VOLUME 7,559 MSCF Action Taken to Stop Flaring: 1. WOA reduced production rates and shut -in 65 wells equaling 310 mmsctd. Wells were shut -in or choked back starting at 0230 hours. Compressors restarted 0 0307 hours. 2. WOA reduced production rates and shut -in 65 wells equaling 310 mmscld. Wells were shut -in or choked back starting at 2236 hours. Page 1 of 1 et FACILITY: GC1 DATE: 28 Feb 2006 BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 06 -0105 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:01 01:49 1 Hrs 48Mins ❑ ❑ ❑ 375 MSCF TOTAL VOLUME 375 MSCF First Determination of Cause: 1. LPS compressor K -7000 & K -7001 shut down due to a problem associated with PLC. Action Taken to Stop Flaring: 1. WOA reduced production rates and shut -in 78 wells equaling 400 mmscfd. Wells were shut -in @ 2326 hours on 2/27. Leak by from HP to LP diverts on dual mode pads is cause for flaring after all LP wells were shut -in. Monday, March 06, 2006 Page 1 of 1 1. Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field 14 Operator BP 5. MonftWear d Disposition March - 2006 PBU - WOA Disposition Volume MCF 20. For production from multiple pods, list contribution of each pool as • percent of Total Volume. 8. Sole 0 Pod Name Pod Code Portent 7 Reinjected 0 PRUDHOE 840150 98.41% LISBURNE 640144 0.17% 9. Flared a vented 1 hour a less a735 MIDNIGHT SUN 640158 0.38 °A PT MCINTYRE 640180 1.01% e. Flared 1 bar (see instil 5,322 v./ BOREALIS 640130 0.03% vented more an or ro 10. Pilot and Purge 50,888 ✓ 11. Used to lease operations (specify in Remarks) 843,336 12. Other (see Instructions) 0 Authorization >I hr Safety S 3ZL r MCF 13. TOTAL VOLUME (ITEMS 612) 903,281 Lease Use MCF It NGL Gas Equivalent 0 Conservation MCF 15. Prchasedgas 0 Waste: MCF 16. Transferred front 0 J7 4- -- 8 40 0,6 Commissioner Date 17. Transferred to: (Express as • negative e1 CGF - 74 587 938 It Remarks: Block I l: Fuel Gas = 843,336 inset and Assist Gas = 0 nisei I hereby certify that the foregoing is tru M coned to the best of myu� rowledge. I Note: signature "Zfle roe Manager Production Taxes and Ro ally All volumes must be corrected to pressure of 14.65 psis and to a temperature of 600 F. Authority 20 AAC25.235. Printed Name Bernard . Hajny Pne I90715e4 -502e // 4 / C`� Data Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 (Unplanned Events less than or equal to 1 hour TIME .. VOLUME DESCRIPTION OF INCIDENT & CAUSE 2301 -2333 1,111 Not required for unplanned events which 0420-0428 278 are Tess than or equal to 1 hour DATE 3/11/2006 3/12/2006 3/12/2006 3/13/2006 3/13/2006 3/28/2006 3/31/2006 DATE 3/2/06 to 3/3/06 3/3/2006 3/31/2006 2237- 2256 264 1049 - 1138 442 1958 -2032 472 1528 -1532 139 2231 -2328 1,029 TOTAL 2202-0021 0338 -0530 1647 -2224 TOTAL 3,735 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT February 2006 'Unplanned Events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 3,122 See attachments 933 1,267 5,322 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO EUMU4ATE CAUSE See attachments 1 1 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME- DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE , DATE 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf TIME „;. VOLUME DESCRIPTION OF INCIDENT & CAUSE ....... ... ACTION TAKEN TO ELIMINATE CAUSE .., See attachments Unplanned Events c 1 Hour Unplanned Events > 1 Hour Assist TOTAL FLARED VOLUME TIME TOTAL TOTAL 0 0 TOTAL 3,735 5,322 Planned Events c 1 Foam and not 0 exceeding 5,000 MCF Planted Events > 1 hour or 0 exceeding 5,000 MCF Pita Purge IMPS MASS 0 ' 59.945 See attachments See attachments See attachments Pags 1 4/26/2008 10:22 AM GPB Flaring Subject: GPB Flaring From: "GPB, Prod Opt TL" <GPBProdOptTL(a3BP.com> Date: Sun, 05 Mar 2006 13:46:50 -0900 To sieve mcmains @admin.statak.us CC: "Kurz, John" <john.karz@a BP.conP, "GPB, Environ TL" <GPBEnv ronTL@BP.com>, "GPB, ,Envi Advisor West" <GPBEnvironAdvisorWest@a BP.com>, "Fiedler, Anne. M" .<Anne.Fiedier@BP.com>, ''Benson, Gary A" <Gary.Benson®BP com>, "Pfeiffer, Jim A" 4im.Pfeiff P.com >, "GPB, GCJ To : Steve McMains, AOGCC steve mcmainsOadmin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Hal Tucker, Prod Optimization Team Leader (907- 659 -4472) Two extended flaring events occurred at GC1 last week. Both events resulted from problems with GC1 process automation. The first event began at 22:35 on February 27 and lasted for 3 hours and 13 minutes. Total volume for this event was 4,979 MSFC. The second event began at 22:02 on March 2 and lasted for 2 hours 19 minutes, this event was closely followed with a full plant shut down that caused a 1 hour and 52 minute flare event. Total volume for the second event series was 5,055 MSCF. After the first event, the process automation techs changed out a bad power supply on an I/O processor. The second event resulted in a change out of a data highway that was associated with the previously worked on I/O processor. An extended flare event is in progress at GC2. The event began at 0700 on March 2 when GC2 was shut down due to a leak in the oil transit line. 2 MMSCFD of stripping gas and water tank purge gas is being maintained to keep the plant warm. We intend to maintain this condition until the plant can be restarted. Likely duration of the shut down is unknown at this time. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization Team Leader bp Exploration AK, Inc (907) 659 -4472 1 of 1 3/6/2006 6:55 AM C� FACILITY: GC1 DATE: 02 Mar 2006 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 22:02 22:42 0 Hrs 4OMins ❑ ❑ ❑ 2,778 MSCF 2. Flare/Relief Valve 22:42 24:00 1 Hrs 18Mins ❑ ❑ ❑ 271 MSCF TOTAL VOLUME 3,049 MSCF First Determination of Cause: 1. LPS compressor K -7000 & K -7001 shut down due to a problem associated with PLC. 2. LPS compressor K -7000 & K -7001 shut down due to a problem associated with PLC. REPORT NO: 06 -0106 Action Taken to Stop Flaring: 1. WOA reduced production rates and shut -in all LP wells equaling 400 mmscfd. Wells were shut -in 0 2242 hours.. Leak by from HP to LP diverts on dual mode pads is cause tor flaring after all LP wells were shut -in. 2. WOA reduced production rates and shut -in all LP wells equaling 400 mmscfd. Wells were shut -in 2242 hours. Leak by from HP to LP diverts on dual mode pads is cause for flaring after all LP wells were shut -in. Monday, March 27, 2006 Page 1 of 1 r 6P FACILITY: GC1 DATE: 03 Mar 2006 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:00 00:21 0 Hrs 21 Mins ❑ ❑ ❑ 73 MSCF 2. Flare/Relief Valve 03:38 05:30 1 Hrs 52Mins ❑ ❑ ❑ 933 MSCF TOTAL VOLUME 1,006 MSCF First Determination of Cause: 1. LPS compressor K -7000 & K -7001 shut down due to a problem associated with PLC. 2. Stop Production shut down due to PLC problem. REPORT NO: 06-0108 BPXA FLARE REPORT PRUDHOE BAY Action Taken to Stop Flaring: 1. WOA reduced production rates and shut -in all LP wells equaling 400 mmscfd. Wells were shut -In 2242 hours. Leak by from HP to LP diverts on dual mode pads is cause for flaring after all LP wells were shut -in. 2. Completed GC shut down. Flare was due to flare assist gas. Monday, March 27, 2006 Page 1 of 1 FACILITY: GC1 DATE: 31 Mar 2006 BPXA FLARE REPORT PRUDHOE BAY REPORT NO: Action Taken to Stop Flaring: 1. Normal plant start up, not enough gas to run LP and IP compressors. 2. WOA reduced production rates and shut -in 17 wells equaling mmscfd. Wells were shut -in or choked back starting at 2235 hours. 06 -0174 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 16:47 22:24 5 Hrs 4Mins 0 ❑ ❑ 1,267 MSCF 2. Flare/Relief Valve 22:31 23:28 0 Hrs 57Mins ❑ ❑ ❑ 1,029 MSCF TOTAL VOLUME 2,296 MSCF First Determination of Cause: 1. Hardware problems with data highway. Total plant shut down, started flaring from LP 100 with assist gas. 2. While bringing production rates up following K -7000 LPS compressors would not load up and discharged to flare. Tuesday, April 04, 2006 Page 1 of 1 1, Facility Number 2. Facility Name PBU GC 1 3- Field 4. Opsralar 5. Ma16Ww d Disposition 1 BP April-2008 PBU - WOA Disposition Volume MCF 20. For production from multiple pools, ask oOnMWtlon of oath pod as • percent of Total Volume. 9. Sold 0 Pod Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 97.47% LISBURNE 640144 0.18% 8. Flared or vented t Inure less 15,567 MIDNIGHT SUN 640158 0.44% PT MCINTYRE 840180 1.73% 9. Flared a vented m (amine.) Man 1 hour (a i e.) 0 BOREALIS 640130 0.079'0 AURORA 640120 0.11% 10. Pilot and Purge 44,164 I 1. Used for lease operations (specify In Remarks) 799,121 12. Omer (see instructions) 0 •. —. Autlwma0orr >7 hr. Safety MCF 13. TOTAL VOLUME (ITEMS 6-12) 858,852 Lease Use MCF 14. NOL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 18. Tanshrred from: 0 Cammsa/3w Dab 17. Transferred to: (Express as a negative s) CGF -70,855,202 18. Remarks: Block I I: Fuel Gas =799,121 mscf and Assist Gass 0 Duct I hereby certify that mewing is true a correct ol my k nowledge. The Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authorlty 20 AACe5235. Signature / Primed Nana Bernard W. Hajny Phone (907)564 4028 Date V/ Form 10-422 Rev. 1 /2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 !Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 4/1/2006 0234 -0239 347 Not required for unplanned events which 4/2/2006 1032 -1121 170 are less than or equal to 1 hour 4/8/2006 0033-0106 688 4/8/2006 0406-0418 250 4/13/2006 2335 -2342 243 4/14/2006 0751-0757 417 4/16/2006 1118-1127 63 4/17/2008 1230-1327 13,063 4/17/2006 2107 -2114 243 4/18/2006 0706-0712 83 TOTAL 15,567 !Unplanned Events greater than 1 hour 1 DATE 1Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 DATE .,,, .. DATE ._._.. TOTAL TOTAL VOLUME TIME TOTAL VOLUME, !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 , VOLUME TOTAL Unplanned Events < 1 Hour 15,567 Unplanned Everts> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Everts > 1 hour or 0 exceeding 5,000 MCF Pilot Purge ® 44,164 Assist O TOTAL FLARED VOLUME 59,731 0 0 0 SP EXPLORATION (ALASKA) INC. PRUDHOE SAY UNIT - GC -1 GAS FLARING INCIDENT REPORT April 2006 DESCRIPTION OF INCIDENT • CAUSE„ - _ See attachments DESCRIPTION OF INCIOEHT & CAUSE ... See attachments DESCRIPTION OF INCIDENT & CAUSE ,, .,.,,:. See attachments ACTION 'TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE , r ,,,,.�,,,�„„ See attachments ACTIN TAKEN TO ELIMINATE CAUSE, See attachments ACTION TAKEN TO ELIMINATE CAUSE, ;w ",7 See attachments Page 1 6/ar2oo6 10:16 AM 1 Facility Number 0290000031 I Facility 12. F Name PBU GC 1 3. Field 4. Operator IBP Ww 15. Monlr of D eposita' May - 2006 PBU - WOA Disposition Volume MCF 20. For producton from multiple pools. list contribution of sect pool as percam of Total Vohrme e. Sold 0 Pod Name Pod Code Percent 7 Reinjected 0 PRUDHOE 640150 96.78% LISBURNE 640144 0.18% 9. Flared or vented t hour or less MIDNIGHT SUN 640158 0.57% PT MCINTYRE 640180 2.47% s Flared or vented more than 1 hour (see duo.) 0 BOREALIS 640730 0.00% AURORA 640120 0.00% 10. Pilot and Purge 44,099 11. Used for lease operations (specify Si Remarks) 843,896 12. Other (see kubudi0m) 0 Authorization >1 hr. Sam MCF 13. TOTAL VOLUME (ITEMS 612) 888,030 Lease Use MCF 14. NGt. Gas Equivalent 0 Conservation MFG 15. Purchased gas 0 Waste: MCF 18. Transferred from: 0 Commissioner Date 17. Transferred to: (Express as a negative 0) CGF - 62,397,294 te. Remarks: Block 11: Fuel Gas = 843,896 mscf and Assist Gas = 0 mscf 1 hereby certify that the to gdnq is true an coin o the test of my knowledge. Signature rite Manager, Production Taxes and Royalty Date is -� 4 4 Note: All volumes must be corrected to pressure of 14.65 psis an d to a temperature of 60o F. Atrthnety 70 A4C25 095. Printed Name Bernard W. Hajny Phone (907)564 -5028 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 'Unplanned Events Tess than or equal to 1 hour DATE .. TIME ,,:. VOLUME , DESCRIPTION OF INCIDENT & CAUSE 5/12/2006 1750 -1755 (Unplanned Events greater than 1 hour 1 DATE,„ , DATE , , , - ,, TOTAL TIME TOTAL 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DESCRIPTION OF INCIDENT & CAUSE ,, ACTION TAKEN TO ELIMINATE See attachments See attachments TOTAL (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 TOTAL Unplanned Events c 1 Hour Unplanned Events • 1 Hour Planned Events c 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME VOLUME,,,,; DESCRIPTION OF INCIDENT & CAUSE,,,,, ., See attachments VOLUME VOLUME 35 Not required for unplanned events which are less than or equal to 1 hour 35 0 0 0 TOTAL 35 0 0 0 MINE 44149 0 44,134 BP EXPLORATION (ALASKA) INC. PRUDHOE SAY UNIT - GC -1 GAS FLARING INCIDENT REPORT May 2006 DESCRIPTION OF INCIDENT & CAUSE,, See attachments � "; , ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour r ACTION TAKEN TO ELIMINATE See attachments ACTION TAKEN TO ELIMINATE CAUSE , ,,,tl, i gnyty See attachments Pape 1 8/8/2006 1:48 PM GPB Flaring Subject: GPB Flaring From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> Date: Tue, 09 May 2006 14:43:20 -0800 To: sieve mcmains @admin.state.ak.us GC: "Kurz, John" <john-kurz@BP.com >, "GPB, Environ TV' <GPBEnvironTL@BP.com>, "GPB, Advisor West" <GPBEnvironAdvisorWest@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson@BP.com >, "Pfeiffer, Jim A " ;Ciim.Pf P.coaP% "GPB,'GC1 Ant Mir" ..<GPBGC1 QFP: S To: Steve McMains, AOGCC steve_mcmains @admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Michael Bolkovatz, Prod Optimization Team Leader (907- 659 -5566) An extended flaring event occurred at GC1 from April 30 to May 7. During this period, the ambient temperature increased from -5 to +20 deg. The GC1 LP /IP compressor bundles were originally designed to pump a heavier mole weight gas and these machines are scheduled to be rewheeled this summer due to their inability to handle leaner gas now coming from the reservoir. The combination of increasing ambients and the inability of the GC1 LP /IP compressors to pump leaner gas resulted in intermittent flaring. Gas production from GC1 has been reduced to prevent this condition from continuing. Intermittent flaring occurred over 34 hrs and 53 minutes, total volume flared was 10,174 MSCF If you require additional information, please don't hesitate to call me. Michael Bolkovatz GPB Production Optimization Team Leader bp Exploration AK, Inc (907) 659-5566 i,of 1 5/21/2006 9:13 AM 1 Facility Number 0290000031 2. Facility Name PBU GC 1 3. Field I BP 4. Operator 5. Mgn Year ol Dbpatiticn June - 2006 PBU - WOA Disposition Volume MCF / 20. For production from multiple pooh. Bat contribution of each pod as a potent W Total Volume. 8. Sold 0 Pod Name Pod Code Percant 7. Re reined 0 PRUDHOE 640150 95.42% LISBURNE 640144 0.23% 8. Flared or yarned 1 hour or !ass 11,101 Y MIDNIGHT SUN 640158 0.77% PT MCINTYRE 640180 3.58% m 9. Flared or vented more an 1 how (see Instr.) 29,832 J BOREALIS 640130 0.00% AURORA 640120 0.00% 10. Pitt and Purge 42,415 1 11. Used for lease operations (specify in Remarks) 710,569 12. Omer (see Instructions) 0 Authorization >1 hr. Safety 2-9 8.32°- r MCF 13. TOTAL VOLUME (ITEMS 8-12) 793,917 Lease Use MCF 14. NGL Gas Egtavalem 0 Conaervauon MCF 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 / Q 0 /� _ -04 £Z4 P m a�l i . Date 17. Transferred to: (Express as a negative r) COIF - 47,371,255 it Bemen: Block 11: Fuel Gas = 710,569 mscf and Assist Gast 0 mscf I hereby certify that the foregoing is true and -. to . best of my knowledge. Signature _ ` Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bemard W. Hajny Phone (907)564-5028 Date 7"t/C'& 7 Form 10 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate (Unplanned Events less than or equal to 1 hour 1 DATE 6/1/2006 6/22/2006 6/22/2006 6/23/2006 6/24/2006 6/25/2006 6/27/2006 6/28/2006 6/28/2006 6/28/2006 6/29/2006 6/29/2006 6/29/2006 6/29/2006 DATE 6/2/2006 6/21/2006 6/22/2006 6/22/2006 6/22/2006 6/22/2006 6/23/2006 TIME :u 2308 -2350 1538 -1635 2150 -2220 1639 -1700 1011 -1024 0254 -0340 0913 -0921 1024 -1040 1202 -1212 1346 -1404 0909 -0928 1438 -1501 1527 -1550 1642 -1656 TOTAL TIME „ 0555 -0710 2009 -2400 0000 -0130 0225 -0415 1250 -1410 1652 -1840 0000 -1308 TOTAL BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT June 2006 VOLUME DESCRIPTION OF INCIDENT & CAUSE 8,750 Not required for unplanned events which 396 are less than or equal to 1 hour 417 131 54 192 67 1,000 14 25 13 16 16 10 11 VOLUME DESCRIPTION OF INCIDENT & CAUSER. 15,313 See attachments 4,000 1,500 1,146 556 750 6,567 29,832 xu ACTION TAKEN TO EUMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour 'Unplanned Events greater than 1 hour 1 ACTION TAKEN TO EUMINATE See attachments Page 1 7/12/2006 9:54 AM (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE„,„,,,„„, TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE„, ,, I See attachments TOTAL 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT • GC -1 GAS FLARING INCIDENT REPORT June 2006 See attachments $Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE „ amn TIME. m , VOLUME „p DESCRIPTION OF INCIDENT & CAUSE.,,,,,..„ „,„,,,, ACTION TAKEN TO EUMINATE CAUSE, „„„„ See attachments See attachments TOTAL Pilot Purge Assist TOTAL FLARED VOLUME 0 TOTAL Unplanned Events c 1 Hour 11,101 Unplanned Events > 1 Hour 29 832 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF 42,41& 0 83,348 Page 2 7/12/2006 9:54 AM FACILITY: GC1 DATE: 02 Jun 2006 BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 06-0264 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 05:55 07:10 1 Hrs 15Mins ❑ ❑ ❑ 15,313 MSCF TOTAL VOLUME 15,313 MSCF First Determination of Cause: 1. High gas transit line pressure caused by CGF compressor problems due to both boosters S/D due to instrument problems. GC -1 opened annex flare valve to flare 300mm. Action Taken to Stop Flaring: 1. WOA reduced production rates and shut -in 41 wells equaling 278 mmscfd. Wells were shut -in or choked back starting at 0555 hours. Friday, June 30, 2006 Page 1 of 1 FACILITY: GC1 DATE: 21 Jun 2006 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING SYSTEM Start Stop Duration 1. Flare/Relief Valve 20:09 24:00 3 Hrs 51 Mins ❑ First Determination of Cause: 1. Plant shutdown - insufficient gas to load LP compressor. Assist gas added to prevent black smoke Action Taken to Stop Flaring: 1. restarting plant REPORT NO: 06-0294 Black Intermittent Smoke Planned VOLUME ❑ ❑ 4,000 MSCF TOTAL VOLUME 4,000 MSCF Friday, June 30, 2006 Page 1 of 1 FACILITY: GC1 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve 3. Flare/Relief Valve 4. Flare/Relief Valve 5. Flare/Relief Valve 6. Flare/Retief Valve DATE: 22 Jun 2006 TIME OF FLARING Black Start Stop Duration Intermittent Smoke 00:00 02:25 12:50 15:38 16:52 21:50 01:30 04:15 14:10 16:35 18:40 22:20 1 Hrs 30Mins 1 Hrs 50Mins 1 Hrs 20Mins 0 Hrs 57Mins 1 Hrs 48Mins 0 Hrs 30 Mins First Determination of Cause: 1. Continued - insufficient gas to load LP compressor. Assist gas added to prevent black smoke 2. Insufficient gas to load Sk -18 LP compressor. Assist gas added to prevent black smoke 3. reason unknown 4. Plant shutdown - insufficient gas to load LP compressor. Assist gas added to prevent black smoke Action Taken to Stop Flaring: 1. Continued ramping up until compressors loaded 2. Continued ramping up until compressors loaded 3. 4. Friday, June 30, 2006 REPORT NO: BPXA FLARE REPORT PRUDHOE BAY ❑ 0 TOTAL VOLUME 06 -0295 Planned VOLUME ❑ 1,500 MSCF ❑ 1,146 MSCF ❑ , 556 MSCF ❑ 396 MSCF ❑ 750 MSCF ❑ 417 MSCF 4,765 MSCF Page 1 of 1 FACILITY: GC1 DATE: 23 Jun 2006 REPORT NO: 06 -0299 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:00 13:08 13Hrs 8Mins W ❑ ❑ 6,567 MSCF 2. Flare/Relief Valve 16:39 17:00 0 Hrs 21 Mins ❑ ❑ ❑ 131 MSCF TOTAL VOLUME 6,698 MSCF First Determination of Cause: 1. Plant shut down and startup. Not enough gas for IP /LP compressors to operate. 2. Plant shut down and startup. Not enough gas for IP /LP compressors to operate. Action Taken to Stop Flaring: 1. Continue to bring up rate to the point where the LP /IP compressors have enough gas to operate. Opened flare valve oft V-136 to keep Clare clean. 2. Continue to bring up rate to the point where the LP /IP compressors have enough gas to operate. Opened flare valve off V -136 to keep flare clean. Friday, June 30, 2006 Page 1 of 1 FW: GPB Flaring Subject: FW: GPB Flaring From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> Date: Fri, 23 Jun 2006 18:37:03 -0800 To: steve_mcmains @admin.state.ak.us CC: "Kurz, John" <jobn.kurz@BP.com>, "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A" <Thu PfeifTer@BP.com >, "GPB, FS1 /S1Y %STP Area Mgc"; > <GPBFS1TL@BP.com >, "GPB, GPMA Ai Mgrt<GPBGPMATI n BP.corn' , "GPB,'GC1 r MM gr ,„}-GPBGC1TL@BII.com*t To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907-793-1241, fax 907 - 276 -7542 From: Hal Tucker, Prod Optimization Team Leader (907 - 659 -4472) Extended flaring events occurred at GPB in the last week. The events occurred at GC1 (6/21 -23), GPMA (6/21 & 22), and FS1 (6/21). The GC1 flare event began after a full plant shut down at (1830 6/21) caused by an automation glitch. Due to the combination of low oil rates as the plant was coming back on and high ambient temperatures, the IP and LP compressors failed to load up. A second automation glitch knocked the plant back down at 2115 on 6/23. Flaring continued intermittently across both events until sufficient oil rate was brought on to enable the LP and IP compressors to load up. Duration of intermittent flaring was 40 hours and 58 minutes, total volume flared was 15,323 MSCF. Two extended flaring events occurred at GPMA. The first event was a shut down of the STV /IP compressor 1801 due to bad exhaust stack temperature switch. Restart of 1801 was hampered due to a bad fire eye. Duration of the event was 3 hours and 12 minutes of intermittent flaring. Total volume was 778 MSCF. A second event occurred at 1306 on June 22 when STV /IP compressor 1800 shut down due to high discharge temperature which was a result of high ambient temperatures. 185 MSCF was flared during the 61 minute intermittent event. On June 21 at FS1, a planned depressuring of the A -HP separator, scrubber and liquid pot for blinding occurred. Duration was 3 hours and 30 minutes, total volume flared was 128 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization Team Leader bp Exploration AK, Inc (907) 659 -4472 1 of 1 6/25/2006 9:1 I AM 12 Facility Number 2 Facility Name 3. Field PBU - WOA 4 Operator IBP S Month/Year N Disposition July -2006 0290000031 PBU GC 1 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pooi as • percent of Total Volume. 8. 80M 0 Pool Nan* Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 95.21% LISBURNE 640144 0.21% II Flared or vented 1 hour or less 678 1. 7 MIDNIGHT SUN 640158 0.60% PT MCINTYRE 640180 3.98% w Nee 9. Flared or vented more aten 1 hour kratr.) 6,676 v BOREALIS 640130 0.00% AURORA 640120 0.00% 10. Paw and Purge 23,405 1 11. Used for lease operations (specify in Remarks) 370,223 = i ' : ..... Authorization >1 hr • -. Safely 447‘ t MCF 12. Other (see Mstruceom) 0 13. TOTAL VOLUME (ITEMS 5.12) 400,962 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste. MCF 18. Transferred Iran: 0 ,'� (�(��(/J�� %J /1 `J —3 � (9 - Cun' issione Moo (9‘ �'/t� 17. Transferred rc: (Express as a negative a) CGF - 24,011,380 7 18. Remarks. Block I I: Fuel Gas = 370,223 mscf and Assist Gas= 0 mscf I hereby certify tat the foregoing is true and correct to the best of my knowledge. / lJ� Signature (.J..,.w 4, rise Manager, Production Taxes and Royalty Note: M volumes must be corrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 20 AAC25.235. / Printed Nam Bernard Name Be W. Hajny Pirate (907)554 -502e Ewe Si f Sic 6 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate J� hour 1 'Unplanned Events Tess than or equal to 1 VOLUME 24 117 14 104 370 49 DATE 7/1/2006 7/4/2006 7/9/2006 7/11/2006 7/11/2006 7/14/2006 DATE TIME 7/1/2006 0802 -1308 7/15/2006 0035 -0610 DATE DATE 7/15/2006 TIME 0255 -0330 1220 -1234 1810 -1820 0558 -0604 0840 -0900 0302 -0312 TOTAL TOTAL TIME TOTAL TIME 1225-2340 TOTAL Assist TOTAL FLARED VOLUME 678 5,046 0 1,630 TOTAL Unplanned Events < 1 Hour 878 Unplanned Events> 1 Hour 5,048 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 1.830 exceeding 5,000 MCF Pilot Purge . 23,41161 0, 30,759 8P EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT July 2006 DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour (Unplanned Events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 2,338 See attachments 2,708 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct VOLUME _ DESCRIPTION OF INCIDENT & CAUSE attachments Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT • CAUSE 1,630 See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour 1 ACTION TAKEN TO ELIMNATE CAUSE , ._- See attachments 1 ACTION TAKEN TO EUMINATE CAUSE attachments 1 ACTON TAKEN TO EUMINATE CAUSE See attachments Page 1 8/9/ 2006 2.00 PM FACILITY: GC1 DATE: 01 Jul 2006 REPORT NO: 06 -0314 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 02:55 03:30 OHrs 35Mins ❑ ❑ ❑ 24 MSCF 2. Flare/Relief Valve 08:02 13:08 5 Hrs 6Mins ❑ ❑ ❑ 2,338 MSCF TOTAL VOLUME 2,362 MSCF First Determination of Cause: 1. Due to PLC cable failure, in LPS section of plant. GC -1 and the Annex S/D. 2. GC -1 start -up following plant shutdown (PLC problem). Flared gas off V -136 until enough gas for Skid 18 IP/LP compressors. Action Taken to Stop Flaring: 1. LPS PLC cable repaired. 2. Finally had enough gas for Skid 18 IP /LP compressors, loaded IP /LP compressors. Monday, July 31, 2006 Page 1 of 1 1 C> FACILITY: GC1 DATE: 15 JUI 2006 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:35 06:10 5Hrs 25Mins ® ❑ ❑ 2,708 MSCF 2. Flare/Relief Valve 12:25 23:40 11 Hrs 15Mins ❑ ❑ ® 1,630 MSCF TOTAL VOLUME 4,338 MSCF First Determination of Cause: 1. Sk -18 LP compressor surging because of a problem associated with reducing rates for ESD test. 2. Depressuring well pad flowlines for shut down work Action Taken to Stop Flaring: 1. continuous tweeking of micon to minimize flaring. 2. Still depressuring REPORT NO: 06-0330 Monday, July 31, 2006 Page 1 of 1 FW: GPB Flaring To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Hal Tucker, Prod Optimization Team Leader (907 - 659 -4472) If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization Team Leader bp Exploration AK, Inc (907) 659-4472 Subject: FW: GPB Flaring From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> Date: Tue, 18 Jul 2006 09:56:52 - 0800 To: steve_mcmains @admin.state.ak.us CC: "Kurz, John" <john.kurzi@BP.com >, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.coin>, "GPB, Environ Advisor West" GPBEnvimnAdvisorWest@BP.com>, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson@BP.com>, "Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com >, "GPB, GC1 Area Mgr" .. ; ftaBGCITL.BP Extended flaring events occurred at GC1 beginning July 15 at 00:35. In preparation for the GC1 turn - around, rate was reduced to perform a full plant ESD test. With the reduced rate, there was insufficient oil rate to allow the IP /LP compressors to bite. Duration of the event was 5 hours and 25 minutes of intermittent flaring, total flared volume was 2,708 MSCF. The event ended when the ESD test was performed. Following the ESD test, the plant and associated equipment required depressuring for safe -out activities. Depressuring for safe -outs continued for 11 hours and 15 minutes, with a total volume of 1,630 MSCF. 1 of 1 7/18/2006 10:44 AM 1 Facilir Number 0290000031 2 Facih Name N � PBU GC 1 3. FiaW 4 razor Ope BP 5. MontlWSar d DispoeNlon August - 2006 PBU - WOA Disposition Volume MCF / ✓ 20. For production from mutllple pools, list conmbution of each pod as a pemea of Total Volume 6. Stxd 0 Pod Name Pad Code Percent T Reinjected 0 PRUDHOE 640150 99.62% LISBURNE 640144 0.07% 8. flared or vented llttxdorless 2,513 MIDNIGHT SUN 640158 0.23% PT MCINTYRE 640180 0.08% 1 hour (see krsv.) 7500 BOREALIS 640130 0.00% d 9. Flared or vented more than AURORA 640120 0.00% 10. Pilot and Purge 41 832 11. Used for lease operations (specify in Remarks) 527,442 12. Other (see instruction) 0 Authorization >1 hr Se Safety 7 500 MCF 13. TOTAL VOLUME (fTEMS 8-12) 579,287 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Pvdtased gas 0 Waste: MCF 16. Transferred from: 0 _ //_ /� / miaar" Date 17. Transferred b: (E�ress as a mitigative e) CGF - 45,729,756 18. Remarks Block 11: Fuel Gas = 527.442 mscf and Assist Gas c 0 mscf I hereby oetily Signs ,-, is true a best of my knowledge. Tate Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Berner W. Rainy G Phone (907)564 -5028 Date f �f U� Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate hour 1 'Unplanned Events less than or equal to 1 TIME VOLUME 1108-1115 1335 -1504 0900 -1000 0001 -0026 0253 - 0301 1030 DATE 8/6/2006 817/2006 8/9/2006 8/11/2006 8/16/2006 8/19/2006 TOTAL 75 297 1,000 2 1,111 28 2,513 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT August 2006 DESCRIPTION OF INCIDENT 8 CAUSE Not required for unplanned events which are less than or equal to 1 hour 1 Unplanned Events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 7,260 See attachments 30 210 DATE 8/4/2006 8/10/2006 8/11/2006 TIME 0000 -1015 1652 -2359 0730-0911 TOTAL 7.500 1 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met VOLUME DESCRIPTION OF INCIDENT 8 CAUSE See attachments DATE TIME TOTAL 1 `Planned Events Exceeding 1 Hour OR Exceeding 5000 Mot TIME .. .., VOLUME DESCRIPTION OF INCIDENT & CAUSE -, M1 ,,.._ ACTION TAKEN TO ELIMINATE CAUSE,,,,,,, .,,,,,,,,,, r , See attachments TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events c 1 four and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 0 0 TOTAL 2,513 7,500 0 0 MIMI 41,832 O 51,845 See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE, See attachments ACTION TAKEN TO EUMINATE CAUSE attachments Pega 1/8/2008 4:57 PM t� FACILITY: GC1 DATE: 04 Aug 2006 First Determination of Cause: 1. GC1 start -up after turnaround Action Taken to Stop Flaring: 1. Started K -7001 BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 06 -0376 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:00 10:15 10Hrs 15Mins [ ❑ ❑ 7,260 MSCF TOTAL VOLUME 7,260 MSCF Monday, August 28, 2006 Page 1 of 1 FACILITY: GC1 DATE: 10 Aug 2006 BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 06 -0400 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 16:52 23:59 71-Irs 7Mins Q ❑ ❑ 30 MSCF TOTAL VOLUME 30 MSCF First Determination of Cause: 1. Depressure PM2 to GC -1 line due to road sluffing off and Drilling Rig almost falling onto line. Depressured line to safely remove Rig from location near line and back onto firm road bed. Action Taken to Stop Flaring: 1. Once PM2 line was depressured flare valves wer closed. Monday, August 28, 2006 Page 1 of 1 Cis FACILITY: GC1 DATE: 11 Aug 2006 2. Depressured line to 49# and proceeded to inspect. REPORT NO: 06-0401 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:01 00:26 0 Hrs 25Mins ❑i ❑ ❑ 2 MSCF 2. Flare/Relief Valve 07:30 09:11 1 Hrs 41 Mins l] ❑ ❑ 210 MSCF TOTAL VOLUME 212 MSCF First Determination of Cause: 1. Depressure PM2 to GC -1 line due to road sluffing off and Drilling Rig almost falling onto line. Depressured line to safely remove Rig from location near line and back onto firm road bed. 2. Operator found Point Mac line off of VSM, Depressured line to B -S /C that is out of service. Action Taken to Stop Flaring: 1. Stopped depressuring tine when it was at a safe pressure to move rig back onto firm section of road. Monday, August 28, 2006 Page 1 of 1 1. Fatuity Number 0290000031 2. Facility Name PBU GC 1 3 Field PBU - WOA 14. Operator IBP 15. MaeM/Nr of Disposition I September -2006 Disposition Volume MCF 20. For production from multiple pools. list contribution of each Paean • pematt of Total Volume 8. Sold 0 Pod Name Pool Code Penent 0 PRUDHOE 640150 96.02% LISBURNE 640144 0.164E e. Flared a vented 1 (tote a bus 7 596 MIDNIGHT SUN 640158 0.28% PT MCINTYRE 640180 3.54% m 9. Flared or vented more an 1 hour (sea Instr.) 0 BOREALIS 640130 0.00% AURORA 640120 0.00% 10 Pad and Purge 41,329 11. Used for lease operations (specify in Remarks) 712,676 12. Other (see instructions) 0 Authorization >7 hr Safety MCF 13. TOTAL VOLUME (ITEMS 6 761,601 Lease Uee MCF 14. NM Gas Equivalent 0 Conservation ' , is. Purchased gas 0 Waste: MCF 16. Transferred ham: 0 Commfaeioner Date 17. Transferred to: (Express as a negative e) CGF - 70,854,548 18. Remarks: Block t 1: Fuel Gas = 712,676 mscf and Assist Gas = 0 mscf I hereby certify that the °going is true a ad to the best of my knowledge Signature J Tine Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pule and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bernard W. Hajny Phone (907)564 -50213 Dare %Q //-o6 1 Forrn 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate J I 'Unplanned Events less than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 347 Not required tor unplanned events which Not required for unplanned events which 486 are less than or equal to 1 hour are less than or equal to 1 hour DATE TIME 9/6/2006 1213 -1218 9/8/2006 0019 -0026 9/9/2006 1624 -1632 9/9/2006 2023 -2029 9/9/2006 2207-2214 9/10/2006 2250 - 2257 9/11/2006 0029 -0036 9/11/2006 0050 - 0057 9/15/2006 0655 -0720 9/15/2006 0738 -0746 9/15/2006 0937 -0943 9/24/2006 2118-2124 9/27/2006 2029 -2040 9/29/2006 1617 -1651 TOTAL 'Unplanned Events greater than 1 hour 1 TIME VOLUME._,,. DESCRIPTION OF INCDENT & CAUSE See attachments TOTAL 556 417 486 486 486 486 1,736 556 417 417 130 590 7,596 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT September 2006 1 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met VOLUME .. DESCRIPTION OF INCIDENT & See attachments DATE TIME TOTAL 0 1 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See anachments DATE TIME TOTAL Unplanned Events <1 Hour Unplanned Events> 1 Hour Plamed Events <1 hour and not exceeding 5,000 MCF Palmed Events > 1 (sour Or exceedtg 5600 MCF Pod Purge Assist TOTAL FLARED VOLUME 0 TOTAL _._. -.. 7,596 0 0 0 WIPS 4t,32S 48,925 ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE . .......... See attachments P50e 1011/2008 1:34 PM GC2 Flaring Subject: GC2 Flaring From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> Date: Sun, 20 Aug 2006 16:45:35 -0800 To: steve_mcmains @admin.state.ak.us To: Steve McMains, AOGCC steve mcmains @admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Hal Tucker, Prod Optimization Team Leader (907 - 659-4472) 1) shut in all HP production to reduce 2nd stage gas volume 2) shut in produced water sweep gas to reduce 3rd stage gas volumes 3) added overhaul resources to ensure 24 hour per day maintenance on K207 4) leaving LPS production on line to reduce restart duration total duration and total flared volume once K207 is back on line and loaded. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization Team Leader CC: "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" < GPBEnvironAdvisorEast@BP.com >, "GPB. Environ, Advisor West" <GPBEnvironAdvisorWest @BP.com >, "Fiedler, Anne M" <Anne,Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer @BP.com >, "GPB, GC2 Area Mgr" <GPBGC2TL@BP.com >, "GPB, GC2 OTL" <gpbec2otl @BP.com >, "Kurz, John" <john.kurz@BP.com >, "GPB, Optimization Engr" <GPBOptimizationEngn@BP.cone>„ "GPB, GC2 Plant Engineer" <GPBGC2P1antEngineer@BP.com>,," GPB, GC2 AMS "<GPBGC2AMS@BP. onnt? -'' r u -50 - 60 mbd of oil is required to provide enough 2nd and 3rd stage gas to load up the IP and LP machines LPS production is predominately gas lifted and takes more time to kick these wells off Shutting in LPS production will require restarting K7000 and K7001 (the copus starting motor sends gas to flare) An extended flaring event is in progress at GC2. IP compressor K207 experienced a seal leak on Aug 19 and requires a new seal. The spare IP j machine (K208) has a short in the motor, requiring the motor to be replaced and therefore is unavailable at this time. Due to the current circumstances at GPB, we have determined that leaving the plant partially running during the K207 maintenance is the most prudent course of action at this time. We have taken the following actions to minimize the total flare volume: 4$ K 70F We are anticipating completion of the work and K207 restart late Tuesday - early Wednesday, Aug 23. We will send you a follow up note with 1 of 2 8212006 7 :55 AM GC2 Flaring 2 of 2 bp Exploration AK, Inc (907) 659-4472 8/21/2006 7:55 AM 1 Facility Number 0290000031 2. Facility Name PBU GC 1 3 Field PBU • WOA 4. Operator 5. Month/Year d Diepoelton BP October -2006 Disposition Volume MCF 20. For production from multiple pods. fist contribution of nob pool as • percent a Tool Yawn. 8. Sold 0 Pool Name Pod Code Percent T ho 0 PRUDHOE 640150 95.43% LISBURNE 640144 0.16% 8. Flared or vented 1 hour or 4,514 MIDNIGHT SUN 640158 0.69% PT MCINTYRE 640180 3.72% 9. Fed or vented more than 1 hour (see katr.) Flared 45,698 ,/ BOREALIS 640130 0.0054 AURORA 640120 0.0096 10. Pad and Purge 40,941 11. Used for lease aperatbm (specify in Remain) 783,245 12. Other (see Instructions) 0 Authorization ,, ht safety 4-5, l X9 MCF 13. TOTAL VOLUME (ITEMS 5.12) 874,398 tease Use MCF 1s. NOL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 18. Transferred from: 0 ��� 1 '► ( �` / ' / /// / �� /� DL Com sslorar /t -fS Deb 17. Transferred to: (Express u a negative e) CGF - 58,076,645 18. Remarks: Block 11: Fuel Gas = 783,245 inset and Assist Gas =0 mscf I hereby certify that the foregoing S true and Z /,y/J�t1e best a my knowledge. - / /��� / Signature i�I rroe Manager, Production Taxes and Royalty Note: All pressure f 14.65 5 c orrected to praswro of 14.65 pale be and to a temperature of 60o F. Authorttv 20 AAC25.235. . //-- Punted Name Bemard W. Hajny Phone (907')584 -5028 oat.* Cp ��eL' Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate �R- 1 'Unplanned Events Tess than or equal to 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 222 Not required for unplanned events which 188 are less than or equal to 1 hour 258 1,111 903 764 24 3 417 208 208 208 DATE 10/12/2006 10/13/2006 10/13/2006 10/15/2006 10/15/2006 10/18/2006 10/20/2006 10/23/2006 10/26/2006 10/26/2006 10/27/2006 10/30/2006 TIME 1128 -1200 0001 -0028 1509 -1540 1650 -1706 1828 -1841 1716 -1727 0227 -0232 0929 -0934 1235 -1247 1235 -1247 1328 -1334 1702 -1708 TOTAL 4,514 1 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 10/10/2006 0300 -0716 33,244 See attachments 10/13/2006 1210 -1454 655 10/13/2006 1600 -2400 1,667 10/14/2006 0001 -2250 9,507 10/30/2006 0918 -1058 625 DATE TOTAL. TIME TOTAL 45,698 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT October 2006 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mc1 VOLUME ,n;4 DESCRIPTION OF INCIDENT & CAUSE See attachments 0 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are Tess than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments r ACTION TAKEN TO ELIMINATE CAUSE,,, „,. ,,,, - „., See attachments Page 1 1 11/9/2006 11:18 AM Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DESCRIPTION OF INCIDENT & CAUSE , n n ACTION TAKEN TO ELIMINATE CAUSE ,. , See attachments See attachments DATE. TIME TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME VOLUME 0 TOTAL 4,514 45,698 0 0 1111111 91,153 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT October 2006 Page 2 11/9/2006 11:18 AM 06-87 Flare Relief Flare Start Date 10/1/2006 Flare End Date 10/31/2006 Time Of Flaring Report Number Date Start Time Volume (MSCF) System Generated 11/2/2006 GC1 Flare Report Stop Time Duration Intermittent Black Smoke Total Volume MSCF) 50212 Planned Reported By 06.76 Flare Relief 10/10/2006 3:00:00 AM 7:16:00 AM 2 minutes No No No BP1 \CLARKTL Determination Cause GC Shut down and lost air pressure due to CPS power failure. Action Taken Shut dovmatiseepa'- -�- Daily Volume (MSCF) 33244 06-85 Flare Relief 10/12/2008 11:28:00 PM 12:00:00 AM 32 minutes No No No 8P1\MESSERTD 222 Determination Cause Equilizing pressure around perimeters for starting GC -1. Action Taken No response taken as this was deemed to be of short duration. Daily Volume (MSCF) 222 06-87 Flare Relief 10/13/2006 12:01:00 AM 12:28:00 AM 27 minutes No No No BP7 \MESSERTD 188 Determination Cause Equalizing pressure around perimeters for starting GC -1. Action Taken No response taken as this was deemed to be of start duration. 10/13/2006 12:10:00 PM 2:54:00 PM 164 minutes No No No BP1\MESSERTD 888 Determination Cause Equilizing pressure around perimeters for starting GC -1. Action Taken GC Start up. 06-87 Flare Retlet -- 10/13/2008 3:09:00 PM- - 3:40:00 PM -- 31 minutes No No No BP1 \MESSERTD 258 Determination Cause Starting K - 7000 Action Taken No response taken as this was deemed to be of short duration. Page 2 of 5 33244 � Flare Start Date 10/1/2006 Flare End Date 10/31/2006 - _ 06.87— Flare Relief 10/13/2006 4:00:00 PM 12:00:00 AM 480 minutes- No No No BPI\MESSERTD Determination Cause Plant start up, not enough gas to run LP and IP compressors. Action Taken Continued to bring on rates for compressors. 06.93 Flare Reliet 10/14/2006 12:01:00 AM 10:50:00 PM 1369 minutes No No No BPI\ MESSERTD Determination Cause GC -1 On start up, problems with Odd reboiler and Annex reboller, can not produce enough gas to operate LP and IP gas compressors Action Taken Hold cunent gas rates and let operations/maint. trouble shoot reboders and LP and IP compressors. 06 Flare Relief 10/15/2006 4:50:00 PM 5:08:00 PM 18 minutes No No No BP1\MESSERTD Determination Cause The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor flooding/TEG carryover when gas rates exceeded the OP on contactor. Action Taken Action Taken 06 Flare Relief 10/18/2006 5:16:00 PM 5:27:00 PM 11 minutes No Action Taken WOA reduced production rates and shut -in 3 wells equaling 50 mmsdd. Welts were shut-in or choked back starting at 1851 hours. 06-98 Flare Relief 10/15/2006 6:28:00 PM 6:41:00 PM 13 minutes No No No 8P1 \MESSERTD Determination Cause The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor flooding/TEG carryover when gas rates exceeded the DP on contactor. WOA reduced production rates and shut -in 3 wells equaling 25 mmacfd. Wells were shut -in or Baked beck starting at 1829 hours. No No BP1\MOMAMD Determination Cause The Carry Over Prevention System initiated LPS flare valve opening to prevent contactor flooding/TEG carryover when gas rates exceeded the 1000 mmsdd operability limit. PCC moved rate to Annex Odd rebolier Is showing a Hi DP at 1000 mmacfd . 1867 Daily Volume (MSCF) 2768 9507 Daily Volume (MSCF) 9507 903 Daily Volume (MSCF) 2014 784 Generated 11/2/2008 Page 3 of 5 Flare Start Date 10/1/2006 Flare End Date 10/31/2006 6-c 06 Flare Relief 10(30/2006 9:18:00 AM 10:58:00 AM 100m61utes?, No No No 5P1UACKSOWM Determination Cause IP compressors lost suction and vented to flare while depressuring Test Separator for LP testing Action Taken Finished depressuring 06-130 Pare Relief 10/30/2006 5:02:00 PM 5:08:00 PM 6 minutes No No No BPIUACKSOWM Determination Cause The Carry Over Prevention System Initiated LPS flare valve opening to prevent contactor flooding/TEG carryover when gas rates exceeded the 1140 mmsctd operability limit due to the LPS compressor recycle Action Taken valve sticking. LPS compressor repaired and stablized rates Daily e (MSCF) 206 825 208 Daily Volume (MSCF) 833 Total Volume 50212 MSCF) Generated 1 1/1!2008 Page 5 of 5 It G. ( G:u flaring InciJcm Subject: RE: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Fri, 13 Oct 2006 13:09:00 - 0800 To: "sieve mcmains @admin.state.ak.us" <' sieve _mcmains@admin.state.ak.us'>, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast @BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A" <Jim.Pfeifer @BP.com >, "GPB, FS3 Area Mgr" <GPBFS3TL@BP.com >, "GPB, FS3 Ops Lead" <GPBFS3OpsLead @BP.com >, "GPB, GC1 Area Mgr" <GPBGCITL@BP.com >, "GPB, GC1 Ops Lead" <GPBGCI OpsLead @BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest @BP.com >, "GPB, FS1 /SIP /STP Area Mgr" <GPBFSITL@BP.com >, "GPB, FS1 Ops Lead" <GPBFS1OpsLead @BP.com >, "GPB, Gas Plants Area Mgr" <GPBGasPlantsTL@BP.com>, "GPB, CGF Ops Lead" <GPBCGFOpsLead@BP.com> CC: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com >; • To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Dwight Warner, GPB Field Optimization Engineer for Hal Tucker /Mike Bolkovatz GPB Prod Optimization Team Leaders Flaring events related to field wide shutdown from power outage. • CGF event occurred on October 10th starting at 08:30 and lasted 1 hr 0 mins, total volume flared was 1005 MSCF. P -203 Res gas to flare header. • FS1 event occurred on October 10th starting at 02:53 and lasted 21 hrs 6 mins, total volume flared was 7,190 MSCF. 1801 compressor unloading most of the day. • FS3 event occurred on October 10th starting at 02:50 and lasted 2 hrs 27 mins, total volume flared was 43,942 MSCF. Field wide power outage lost 1802/03 tandem compressors and 1804 TN. • GC1 event occurred on October 10th starting at 03:00 and lasted 4 hr 16 mins, total volume flared was 33,244 MSCF. GC shut down and lost air pressure due to power outage. • FS1 event occurred on October 11th starting at 00:01 and lasted 23 hrs 58 mins, total volume flared was 7,150 I of 2 10/13/2006 1:23 PI RE: 61 Gas Flaring Incident 201 MSCF. 1801 tandem compressor unloading due to low rates. • FS3 event occurred on October 11th starting at 00:01 and lasted 4 hrs 6 mins, total volume flared was 741 MSCF. 1802 tandem compressor controls problem where it would not load. • CGF event occurred on October 12th starting at 17:07 and lasted 4 hrs 38 mins, total volume flared was 86 MSCF. Intermittent flaring of MI as facility was restarted after complete field power outage. • FS1 event occurred on October 12th starting at 00:01 and tasted 13 hrs 4 mins, total volume flared was 3,873 MSCF. 1801 tandem compressor unloading due to low gas rates. If you require additional information, please don't hesitate to call me. Dwight Warner GPB Field Optimization Engineer (907) 659 -4382 for Hal Tucker /Mike Bolkovatz GPB Prod Optimization Team Leader (907)- 659 - 4472/5566 10/13/2006 123 Pt ti I'Il ( las Flaring Incidents Subject: GPB Gas Flaring Incidents From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Thu, 19 Oct 2006 13:34:57 -0800 To: "steve_mcmains@admin.state.ak.us" <'steve _mcmains @admin.state.ak.us' >, "GPB, Environ TL" <GPBEnvironTL@BP.com >, "Fiedler, Anne M" <Anne.Fiedler @BP.com >, "Benson, Gary A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com >, "GPB, GC1 Area Mgr" <GPBGC LTL @BP.com >, "GPB, GC3 Area Mgr" <GPBGC3TL@BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest BP.com> To: Steve McMains. AOGCC steve_mcmains @admin.state ak us 907 - 793 -1241, fax 907 - 276 -7542 From: Michael Bolkovatz GPB Prod Optimization Team Leader • GC3 event occurred on October 13th starting at 11:47 and lasted MSCF. Depressured X Pad for LDF repairs. • GC3 event occurred on October 13th starting at 13:24 and lasted MSCF. Plant start up, not enough gas to run LP and IP compress • GC1 event occurred on October 13th starting at 12:10 and lasted MSCF. Equalizing pressure around perimeter valves for starting G • GC1 event occurred on October 13th starting at 16:00 and lasted MSCF. Plant start up, not enough gas to run LP and IP compress • GC 1 event occurred on October 14th starting at 00:00 and lasted MSCF. Plant start up, not enough gas to run LP and IP compress • GC1 event occurred on October 14th starting at 12:10 and lasted MSCF. Equalizing pressure around perimeter valves for starting G • GC3 event occurred on October 15th starting at 21:00 and lasted MSCF. Depressured X Pad for LDF repairs. 1 hr 6 mins, total volume flared was 300 7 hrs 18 mins, total volume flared was 9,000 ors. 2 hrs 44 mins, total volume flared was 655 C -1. 8 hrs 0 mins, total volume flared was 1,667 ors. 22 hrs 49 mins, total volume flared was 9,507 ors. 2 hrs 44 mins, total volume flared was 655 C -1. 3 hr 0 mins, total volume flared was 300 1 of 2 10119/2006 2:36 PM Gay flaring Incidents 2of2 If you require additional information, please don't hesitate to call. Michael Bolkovatz GPB Production Optimization TL (907) 659 - 4472/5566 10/19/2006 2:36 PN Facility Number 0290000031 I1. 2. Facility Facility Name PBU GC 1 3. FFink, f PBU - WOA 4. OpBoperator operator BP 5. Ma18WNr of Disposition November - 2006 Disposition Volume MCF 20. For production from multiple pods, list Contribution at each pool as a percent of Total Volume e. Sod 0 Pod Name Pod Code Percent 7 Reinjected 0 PRUDHOE 640150 95.65% LISBURNE 640144 0.21% 8. Flared or vented 1 tour or less 4,467 MIDNIGHT SUN 640158 0.51% PT MCINTYRE 640180 3.63% 1 hour (see Instr.) 0 BOREALIS 640130 0.00% 9 Flared or vented more than AURORA 640120 0.00% le Pilot and Purge 38,233 11. Used for lease operations (specify in Remarks) 878,846 12. Other (see instructions) 0 Aotflodntion >1 hr. Safely MCF 13. TOTAL VOLUME (ITEMS 8.12) 921,546 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Ptrchased gas 0 Waste: MCF 18. Transferred from: 0 Commissioner ale 17. Transferred to: (Express as a negative s) CGF - 53,431,326 B. Remarks: Block 11: Fuel Gas = SJS S46 mscf and Assist Gas = 0 rtscf I hereby certify that the toregoino b true and carne Signature the hest of my knovAedge. Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pale and to a Authority 20ro F. AAC25.235. Printed Name Bemard W. Hajny Phone (907)564-5028 Dare /0 — /- 5-- "C " &' Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate SNP DATE 11/1/2006 11/1/2006 11/9/2006 11/17/2006 11/17/2006 11/17/2006 11/22/2006 11/22/2006 11/23/2006 11/30/2006 0556 -0641 1142-1155 1812 -1821 2343 -2350 2142-2152 TOTAL 215 903 69 53 694 4,467 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT November 2006 !Unplanned Events less than or equal to 1 hour TIME � VOLUME DESCRIPTION OF INCIDENT & CAUSE 1534 -1548 972 Not required for unplanned events which 1608 -1617 625 are less than or equal to 1 hour 0858 -0904 417 0240-0304 200 0350-0436 319 1 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour (Unplanned Events greater than 1 hour 1 , DATE TIME: VOLUME DESCRIPTION OF INCIDENT & CAUSE. ACTION TAKEN TO EUMINATE CAUSE See attachments See attachments TOTAL 0 !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE : - ..,� . TIME �__ VOLUME,_ DESCRIPTION OF INCIDENT & CAUSE . g , g , s , ACTION TAKEN TO ELIMINATE CAUSE i See attachments See attachments TOTAL 0 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 DATE f , -u •, TIME . < , VOLUME_ DESCRIPTION OF INCIDENT A CAUSE , - - -, ACTION TAKEN TO EUMINATE CAUSE @�,,,.,, See attachments See attachments TOTAL Unplanned Events c 1 Hour Unplanned Events> 1 Hour Planned Events c 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Piot Purge Assist TOTAL FLARED VOLUME 0 TOTAL 4,467 0 0 0 SSW 42 Page 1 12/10/2006 4:37 PM Facility Number 0290000031 11. 2. Facility Noma PBU GC 1 3. Field PBU - WOA a_ Operator BP 5. MonthN ar d Oispositlm December - 2006 Disposition Volume MCF ✓ J 20. For production from multiple pods, flat contribution of each pool as a percent of Total Volume 6. Sold 0 Pod Name Pool Code Percent 7. Reinpicted 0 PRUDHOE 840150 94.65% LISBURNE 640144 0.22% s. Flared or vented lhour or less 13,500 „f' MIDNIGHT SUN 640158 0.76% PT MCINTYRE 640180 4.37% 9. Flared or vented more than 1 dour (see Intr.) 667 BOREALIS 640130 0.00% AURORA 640120 0.00% 10. Wdand Purge 39,567 ,/ 1 t. Used for leasee operations (specify In Remarks) 959,769 12. oe,er lase lnetiuclloru) 0 Authorization >1 hr Safety b �� MCF 13. TOTAL VOLUME (ITEMS 612) 1,013,503 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF IS Purchased gas 0 Waste MCF t6. TmetMled from: 0 Co�✓ ,2�5-07 �f; e Q c / ' / ' , ^�'J Date 17. Transferred to: (Ewress as a negative a) CGF - 71,928,228 1e. Remarsa: Black 11: Fuel Gas = 959,769 msc( and Assist Gas = 0 mscf loaf the fue the • d knowledge. 1 hereby certify that n c my Sipr arse 4L....... � nue Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bemard W. Hajny Phone (907).564-5026 Dare //S --d? 4 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate (Unplanned Events Tess than or equal to 1 hour 1 DATE 12/3/2006 12/8/2006 12/16/2006 12/17/2006 12/25/2006 TIME 1603 -1614 1357 -1408 2321 -2334 1606 -1640 0858 -0909 TOTAL VOLUME DESCRIPTION OF INCIDENT & CAUSE _ 764 Not required for unplanned events which 764 are less than or equal to 1 hour 90 11,806 76 13,500 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -1 GAS FLARING INCIDENT REPORT December 2006 1 (Unplanned Events greater than 1 hour VOLUME DESCRIPTION OF INCIDENT & CAUSE 667 See attachments DATE TIME 12/30/2006 0326 -0726 TOTAL 667 , ACTION TAKEN TO EUMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO EUMINATE CAUSE..,,. , See attachments 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf TIME.....,.,. VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE lonsgarm See attachments See attachments DATE TOTAL ..sz DATE TIME TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 0 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mef 1 VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments 0 xm TOTAL 13,500 687 0 0 39,567; 0 53.734 ACTION TAKEN TO EUMNATE CAUSE ...�...,« See attachments Page 1 1/12/2007 10:24 AM Flare Start Date 12/1/2006 Flare End Date 12/31/2006 GC1 Flare Report Time Of Flaring Report Number Date Start Time Stop Time Duration Intermittent / Black Smoke / Planned Reported By Volume (MSCF) 06228 Flare Relief 12/30/2006 328:00 AM 7:26:00 AM 240 minutes No No No BP1\CLARKTL 667 Determination Cause Problem associated with vent valve on X•106. Action Taken Flaring was permitted to continue while GC operations personnel attempted to reseat vent valve. GPB Gas Flaring Incident Subject: GPB Gas Flaring Incident From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Sun, 31 Dec 2006 13:28:49 -0900 To: stcve_mcmains @adnin.state.ak.us CC: "GPB, Environ TL" <GPBEnvironTL @BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson @BP.com>, "Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com >, "GPB, FS2/COTU Area ?a� Mgt" GPBFS2TL@BP.cotrt > „b To: Steve McMains, AOGCC steve mcmains @admin.state.ak.us 907 - 793 -1241, fax 907- 276 -7542 From: Dwight Warner, GPB Field Optimization Engineer for Hal Tucker, GPB Prod Optimization Team Leader An extended flaring event occurred at GPB on December 30, 2006. GC1 compressor K -106 flared due to a problem with the vent valve. Flaring occurred while operations reseated the valve. Flaring occurred from 0326 to 0726 (240 minutes) and a total of 667 MSCF was flared. If you require additional information, please don't hesitate to call me. Dwight Warner, GPB Field Optimization Engineer (907) - 659 -4382 or Hal Tucker GPB Prod Optimization Team Leader (907)- 659 -44 I of 1 1/2/2007 7:18 AM