HomeMy WebLinkAboutPrudhoe Bay Unit GC 3 / BPSTATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2006
FACILITY: PBU GC 3
OPERATOR: BP EXPLORATION
1 Facility Number
2. Facility Name
3 Field
PBU - WOA
4. Operator 8. MontiWwd Disposition
BP January
PBU GC 3
Disposition
Volume MCF
20. For production from multiple pods, list contribution d each pool as a percent of
Total Volume.
A Solo
0
Pod Name
Pool Code
Percent
7. Rehyected
0
PRUDHOE
640150
100.00%
8. Flared or vented hour or less
453
1 Note (see inst.)
0
9. Faired or vented more than
10. Pilot and Ptsga
14,794
11. Used for base operations (specify In Remarks)
571,021
12. Other (see instructions)
0
Authorization >1 hr
Safety
MCF
13. TOTAL VOLUME (REMS 612)
586,268
Lease Use
MCF
14. NGL Gas Eaivabm
0
Conservation
MCF
1s. Purcneaed gas
0
Waste
MCF
16. Transferred holm:
0
Commissioner Date
17. Transferred to: (Express as a negative a) CGF
- 27,065,218
1e. Remarks Block 11: Fuel Gas = 571,021 rose( and Assist Gas = 0 mscf
I hereby certify mat he foregoing is true and correct to the best of my knowledge.
I _ ,{/��
SignatureY ¢ - � U time Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
e
Authority 20 AAC25 23 F.
53.
Printed Name Bemard . Hajny Phone (907)564-5028 Date 2-1C-66
Form 10.422 Rev 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1
(Unplanned Events less than or equal to 1 hour
DATE TIME - VOLUME DESCRIPTION OF INCIDENT & CAUSE
1/18/2006 0110 -0116
1/18/2006 0436 -0441
1/19/2006 0033 -0036
1/22/2006 2047 -2100
1/29/2006 2226
1
(Unplanned Events greater than 1 hour
VOLUME_- DESCRIPTION OF INCIDENT & CAUSE - -- ACTION TAKEN TO EUMINATE CAUSE �.,,, ;; ,,.....�,,,,,, ;; �, ;
See Attachments See Attachments
DATE
TOTAL
TIME
TOTAL
TIME
TOTAL
Unplanned Events c 1 Hour
Unplanned Events> 1 Hour
Planned Events c 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pitt Purge
Assist
TOTAL FLARED VOLUME
TOTAL
VOLUME
167 Not required for unplanned events <= 1 hr
69
21
181
15
453
0
1
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
VOLUME DESCRIPTION OF INCIDENT & CAUSE .- .. ;:.:..:.. ACTION TAKEN TO ELIMINATE CAUSE
0
1
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DESCRIPTION OF INCIDENT 6 CAUSE ACTON TAKEN TO ELIMINATE CAUSE _, -
See Attachments
0
TOTAL
453
0
0
0
man 14,794;
0
15247
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
January 2006
See Attachments
See Attachments
ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events which
See Attachments
Page 1
2/8/1006
9:35 AM
1. Facility Number
0290000033
Z Facility Name
PBU GC 3
3. Field
14. Operator
BP
BP
5. Mont Disppsltbrt
February
PBU - WOA
Disposition
Volume MCF
n/
20. For production from multiple pods, list contribution of each pod ass percent of
Total Volume
S. Sold
0
Pod Name
Pod Code
Percent
7. Reinjected
0
PRUDHOE
640150
100.00%
/
/
✓
8. Flared or vented 1 NOW w ins
352
9 Flared or vented more than 1 hour (see rose.)
198
10. Pilot and Purps
12,571
11. Used for lease operations (specify in Remarks)
472,483
• .. '` : -
Authorization >r M.
.... `�-;+'::
Selery -
- MCF
12. Other (see instructions)
0
13. TOTAL VOLUME (ITEMS 8-12)
485,804
Lease Use
19t�
MCF
14. NGL Gas Equivalent
0
,
Conservation
MCF
15. Purchased gas
0
Waste.
F
16. Transferred front
qqq [ /
�/ z � / "' /, ' /� — Y� / � : VIA /
17. Transiened to: (Express as a negative e) CGF
- 22,197,987
18. Remarks: Block l l: Fuel Gas = 472.483 rnscf and Assist Gas = 0 inset.
I hereby Certify that the foregoing is hue an On the beet of my knowledge.
Signature Tone Manager, Production
Taxes and Royalty
Date 7 — ? —��„
Note: All volumes must be
corrected to pressure of 14.65 psla
and to a temperature of 60o F.
Authority 211 AACVS, 9 45.
Printed Name Bemard . Halny Phone (907)584 -5028
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
(Unplanned Events Tess than or equal to 1 hour
-_= DATE , TIME
2/18/2006 1418 -1432
2/19/2006 0014 0022 56
2/25/2006 2131 -2137 42
2/27/2006 0051 -0111 60
TOTAL
(Unplanned Events greater than 1 hour
1
DATE
2/16/2006
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE,,,„,„,.,.,
0810-0930 198 See Attachments
TOTAL
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
TIME _.,�_ VOLUME'
TOTAL
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
TIME - -: - -• VOLUME___ DESCRIPTION OF INCIDENT & CAUSE„,„,,,,,„, ACTION TAKEN TO EUMINATE
See Attachments See Attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Plarvied Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
352
198
0
0
TOTAL
352
198
0
0
- 12,5711
0I
13.121
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT • GC -3
GAS FLARING INCIDENT REPORT
February 2006
VOLUME DESCRIPTION OF INCIDENT & CAUSE -
194 Not required for unplanned events c= 1 hr
ACTION TAKEN TO EUMINATE CAUSE
Not required for unplanned events which
ACTON TAKEN TO ELIMINATE CAUSE__,
See Attachments
DESCRIPTION OF INCIDENT & CAUSE .. ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
Page 1
3/7/2006
10:18 AM
C�
FACILITY: GC3 DATE: 16 Feb 2006
REPORT NO: 06 -0087
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 08:10 09:30 ! Hrs tMins ® ® O 198 MSCF
TOTAL VOLUME 198 MSCF
First Determination of Cause:
1. At approx. 0810 hrs, it was reported from Gc rover that the burn pit was producing black smoke.
This was not caused by process upset but by high ambient temps approx. 38F. Causing heavy
ends in pipe mixing with purge gas causing incomplete combustion and black smoke.
Action Taken to Stop Flaring:
1. Manually opened pv -03 -0611 Flare valve to burn pit and added assist gas to help burn cleaner.
Not enough rate so flared from C -S /C which cleared the black smoke.
Wednesday, February 22, 2006 Page 1 of 1
1. Facility Number I2. Facility Name
0290000033 I PBU GC 3
3 FIOId I4.
PBU • WOA
Oparatir
( BP
5. Mon tiWw a Disposition
March -2006
Ofspeaitbn
Volume MCF
20. For production from multipb pods, list onntntutkm of each pool as a percent of
Total Volume
8. Sob
0
Pool Name
Pool Cade
Percent
7.
0
PRUDHOE
640150
100.00%
9. Flared or vented l hour or ass
3,570
9. Flared or vented more than 1 tar One insfrJ
0
10 Plot and Purge
15,170
11. used for base operations (specify in Remarks)
594,759
..
12. Ottw (see instructions)
Auearintbn >1 hr
Safety
MCF
13. TOTAL VOLUME (ITEMS 8-12)
613,499
LNN Use
MCF
14. NGL Gos E4uhgk9ht
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
18. Transferred front
0
Commissioner Date
17. Tram d fene to: (Express as a negative e) CGF
- 31,079,271
18. Remarks: Block I I: Fuel Gas = 594,759 mad and Assist Gas = 0 mscf
i hereby certify that the foregoing b the teal of my knowledge.
e rise Manager, Production Taxes and Royalty
Signature
Note: All volumes must tx
corrected to pressure of 14.65 pule
and to a temperature of 60o F.
Authority 20 AAC25.235.
Printed Name Bemard W. Rainy
Phone (907)564 -5028 Date i i /7 — Dh
s
Atm
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit In Duplicate
(Unplanned Events less than or equal to 1 hour
DATE TIME
3/4/2006 0153 - 0220
3/5/2006 0108 -0205
3/12/2006 2228 -2304
3/12/2006 2340 -2400
3/13/2006 0000-0007
3/13/2006 1040 -1110
3/13/2006 2000 -2022
3/28/2006 1032 -1039
TOTAL
(Unplanned Events greater than 1 hour
!Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
1
ss DATE �v:...-.
1
TIME,. VOLUME DESCRIPTION OF INCIDENT & CAUSE _,.. „,..., ACTON TAKEN TO ELIMINATE CAUSE,,,,, ,,,,,.,.
See Attachments
TOTAL
TIME,„ �ss+.„Tr, VOLUME. DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE ., e ,,.�,.
See Attachments
TOTAL
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME , DESCRIPTION OF INCIDENT & CAUSE . , ACTON TAKEN TO ELIMINATE CAUSE v .. m , ; ,„. ; �, « ,,..�,I
See Attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Planned Events < 1 hour and not
exceeding 5000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
1
, VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTON TAKEN TO EUMINATE CAUSE - , tea -,
563 Not required for unplanned events <= 1 hr Not required for unplanned events which
625
1,075
167
29
729
319
63
3,570
0
0
0
TOTAL
3.570
0
0
0
Sill 15.1*
• *
18.740
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC-3
GAS FLARING INCIDENT REPORT
February 2006
See Attachments
See Attachments
See Attachments
Pagel
4/10/2006
11:22 AM
1. Facility Nunbar 2. Facility Name
0290000033 I PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. Monft'sw d Disposition
April
Disposition
Volume MCF
/
20. For production from multiple pods, list contribution of each pod as • percent of
Total Vdune
e. Sold
0
Pod Name
Pool Code
Percent
7 Reinjected
0
PRUDHOE
640150
100.00%
8. Flared or vented 1 hour or less
456
9. flared oc vented more than 1 hour (see Instr.)
917 :/
10. Not and Purge
'�
14,444
11. Used for lease operations (specify in Remarks)
467,359
Authorization >1 hr.
Safety
t 1
MCF
12. Other (sae instructions)
0
13. TOTAL VOLUME (ITEMS 8-12)
483,176
Lease Use
MCF
14. NGL Gas Equivalent
Conservation
MCF
75. Purchased gas
0
waste.
MCF
0
. //
/ / /�',��
/ ./'r 6 7 Y-.�' 7-14-06
are
18. Transferred from.
17. Transferred to: (Express as a negatives) CGF
- 24,746,685
18. Remarks: Block 11: Fuel Gas = 467,359 rltscf and Assist Gas = 0 reef
1 hereby centfY that l ong is true and corn to at of my knowfed9e•
ree Manager,
Production Taxes and Royalty
//__
Date Q 10 /�
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F.
Authority 20 AAC °5.935.
Signature
Panted Name Bernard W. Hajny Phone (907)5e4-5028
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1
'Unplanned Events less than or equal to 1 hour
, DATE ,. TIME _ _ VOLUME- DESCRIPTION OF INCIDENT 8 CAUSE -.r _ ACTION TAKEN TO EUMINATE CAUSE .. ,,;„
4/1/2006 0149 -0157 139 Not required for unplanned events <= 1 hr Not required for unplanned events which
4/25/2006 1036 -1115 217
4/25/2006 1342 -1400 100
TOTAL
1
(Unplanned Events greater than 1 hour
DATE _ . .;. TIME a , -,_ VOLUME DESCRIPTION OF INCIDENT S CAUSE, - ACTON TAKEN TO EUMINATE CAUSE ,, ,�,:,,,..„
See Attachments
4/23/2006 1615 -1900 917 See Attachments
_ DATE,„
TOTAL
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE = _ _. TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ,, ACTION TAKEN TO EUMINATE CAUSE
See Attachments See Attachments
TOTAL
TIME
TOTAL
456
917
0
1
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
VOLUME DESCRIPTION OF INCIDENT & CAUSE _.,. ACTION TAKEN TO ELIMINATE CAUSE,,,..,,,,,
See Attachments
0
TOTAL
458
Unplanned Events c 1 Hour
Unplanned Events > 1 Hour 917
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge Des 14,444,
Assist 11111nall Oj
TOTAL FLARED VOLUME 15,817
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
April 2006
See Attachments
Page 1
5/9/2008
10:30 AM
FACILITY: GC3 DATE: 23 Apr 2006
First Determination of Cause:
1. LPS compressor K - 7000 Water Wash
REPORT NO: 06-0228
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 16:15 19:00 21irs 45Mins 0 ❑ ❑ 917 MSCF
TOTAL VOLUME 917 MSCF
Action Taken to Stop Flaring:
1. Flaring was permitted to continue while GC operations/maintenence personnel completed Water
Wash.
Tuesday, April 25, 2006 Page 1 of 1
1 Facility Number
0290000033
2. Facility Name
I PBU GC 3
3. Field 14. Operator
PBU - WOA I BP
S Month/Year of Disposition
May - 2006
Diapostdoe
Volume MCF
/
20. For production from multiple pools, Nst contribution of each pool as a percent of
Total Volume
6. Sold
0
Pool Name
Pool Code
Percent
7 Reinjected
0
PRUDHOE
640150
100.00%
8. Flared err rented 1 moor or less
130
1 Pout Was re,)
1,434 V
9. Flared re Wined more than
10. Peot and Purge
15,819
11. Used tar lease operations (specify In Remarks)
481,690
12. Other (see Instructions)
0
Authorization >1 hr
Salary
''/ l/
T'�T
MCF
13. TOTAL VOLUME STEMS 6-12)
499,073
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
16. Transferred from:
0
p
-1 . 06
on
17. Transferred to: (Express as a negate s) CGF
- 21,439,685
1e. Remarks Block 11: Fuel Gas = 481,690 rnsef and Assist Gas = 0 tnscf
I hereby certify that the for ' rap
/ Signature
is tine and bast of my knowledge.
Tice Manager, Production Taxes and Royalty
e All r 4.
corrected ted to pressure of f 1 14.65 5 be
pule
and to a temperature of 60o F.
Authority 20 AAC25.235.
Printed Name Bernard W. Hajny Phone (907)564 -5028 Date 6 - /2-.67
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
1
$Unplanned Events Tess than or equal to 1 hour
DATE .... TIME: -- ___ VOLUME DESCRIPTION OF INCIDENT 6 CAUSE Ary ACTION TAKEN TO ELIMINATE CAUSE - -, :: .::
5/2/2006 1406 -1426 130 Not required for unplanned events <= 1 hr Not required for unplanned events which
1
`Unplanned Events greater than 1 hour
DATE TIME - , VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE
5/13/2006 1307 -1635 431 See Attachments See Attachments
5/16/2006 0300 -1502 1,003
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
VOLUME, DESCRIPTION OF INCIDENT & CAUSE,,, ., ACTION TAKEN TO ELIMINATE CAUSE,, ,,,,,
See Attachments
DATE .,, x: TIME
DATE
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
TOTAL 1,434
TOTAL
TOTAL
130
0
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
May 2006
See Attachments
1
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
TIME DESCRIPTION OF INCIDENT & CAUSE . , ACTON TAKEN TO EUMINATE CAUSE__,. _
See Attachments See Attachments
0
TOTAL
Unplanned Events c 1 Hour 130
Unplanned Events > 1 Hour 1,434
Planned Events c 1 hour and not 0
0
SWIM 10.810 '
a 0
17,383
Page 1
8/8/2008
1:40 PM
i�
FACILITY: GC3 DATE: 13 May 2006
BPXA FLARE REPORT
PRUDHOE BAY
REPORT NO: 06 -0245
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 13:07 16:34 3 Hrs 27Mins ❑ ❑ ❑ 431 MSCF
TOTAL VOLUME 431 MSCF
First Determination of Cause:
1. PSV's on blowcases in snowshelter leaking into flare header, added assist gas to keep flare burning
clean.
Action Taken to Stop Flaring:
1. PSV crew called out to repair PSV's. When repaired stopped addeng assist gas.
Wednesday, May 31, 2006 Page 1 of 1
t�
FACILITY: GC3 DATE: 16 May 2006
REPORT NO: 06-0251
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/ReliefValve 03:00 15:02 12Hrs 2Mins ® ❑ ❑ 1,003 MSCF
TOTAL VOLUME 1,003 MSCF
First Determination of Cause:
1. B slugcatcher S/D and the skid 4a inlet leaked by opening the flare valve intermittently.
Action Taken to Stop Flaring:
1. Troubleshoot slugcatcher S/D and got the S/D to clear. Outlet open and flare valve closed.
Wednesday, May 31, 2006 Page 1 of 1
I. Facility Number
0290000033
`2. Facility Name
IPBU GC 3
3 Field
PBU - WOA
4. Operator
BP
5. Month/Veer d Disposition
June -2006
Disposition
Volume MCF
20. For production from multiple pools list contribution of each pod as a percent of
Taal Volume.
8. Soo
0
Pod Name
Pool Code
Percent
7. Reinjected
0
PRUDHOE
640150
100.00%
9. Flared or vented 1 hour or less
208
9. Flared or vented more than 1 hour (see Instr.)
0
10. P9a and Purge
16,178
11. Used for lease operations (specify In Remarks)
460,296
12. Other (see Instructions)
0
Authorization >1 hr
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
476,682
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MFG
15. Purchased gas
0
Waite:
MCF
16. Transferred horn:
0
Commissioner Dees
17. Transferred to: (Express as a negative 5) COP
- 22,283,131
1e. Remarks. Block II: Fuel Gas = 460,296 mscf and Assist Gas = 0 mscf
1 hereby codify that the toregoag is tam and the best of my knovnedge.
Signature . Ali Tale Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
aand ut a temperature of 35. F.
Authority 20 aac2sass.
P
Printed Name Bernard W. Hajny Phone (907)564-5028 Date 7 /f - v�„
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
!Unplanned Events less than or equal to 1 hour
DATE _ TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE -.. :- 2; . ., m ACTION TAKEN TO EUMINATE CAUSE
6/11/2006 0850-0950 208 Not required for unplanned events <= 1 hr Not required for unplanned events which
TOTAL
TOTAL
208
1
!Unplanned Events greater than 1 hour
DATE VOLUME_ DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE See Attachments See Attachments
0
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
June 2006
1
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
VOLUME DESCRIPTION OF INCIDENT & CAUSE
See Attachments
DATE.. . TIME
TOTAL
1
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
® DATE TIME S a VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE
See Attachments See Attachments
TOTAL
Unplanned Events c 1 Hour
Unplanned Events > 1 Hour
Planned Events c 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
0
0
TOTAL.
208
0
0
0
18,1TSi
16.386
1
ACTION TAKEN TO EUMINATE CAUSE ,..,,,, q „,.,.
See Attachments
Pape 1
7/12/2006
9:54 AM
Facility Number
0290000033
I1. 2. Facility Nan*
PBU GC 3
3. Field
PBU - WOA
4. Operator
BP
5. Mormwee d Deposition
July -2006
Disposition
Volume MCF
✓
20. For production from multiple pods, lbt CiontrIbutiOn Of eadl pod as a peened of
Total Volume.
8. Sad
0
Pool Name
Pool Code
Percent
7 Rekpecto0
0
PRUDHOE
640150
100.00%
8. Flared or vented t hour or bas
254
1 hour (see keno.)
3,118
s. Flared or vented more man
to. Not and Purge
15,878
11. Used for lease operations (specify in Remarks)
409,313
: r.'
12. Other (see kgtiwtbns)
0
Auti txl grl2atl >1 hr.
Safety
3t tlt
MCF
13. TOTAL VOLUME (tTEMS e-12)
428,363
Lease Use
MCF
it NGL Gas Equtvalem
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
18. Transferred from'
0
ale Ci/1 /y
yj/(4
/� 49aa
17. Transferred b: (Emress as a negative a) CGF
- 27,187,060
/r
ta. Remarks. Block I l' Fuel Gas = 409,313 tnscf and Assist Gas = 0 mscf
I hereby Certify that the foregoing is true and correct to the best of my knowledge.
/ M� � L in '
Signature 4 Tae Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 pale
and to a temperature of 60o F.
Authority 20 AAC25.235.
J
Footed Name Bernard W. Hajny Phone (907)56+ - 502e Date 8/ C/ 6
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Ad-
1
'Unplanned Events less than or equal to 1 hour
DATE TIME ; VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE idirioor
7/22/2006 1510 -1600 104 Not required tor unplanned events a 1 hr Not required tor unplanned events which
7/24/2006 1113 -1127 150
TOTAL
'Unplanned Events greater than 1 hour
1
DATE
7/22/2006
7/30/2006
TIME
0115 -0655
0400 -0543
TOTAL
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
DATE
TIME
TOTAL
254
3,118
0
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
June 2006
VOLUME DESCRIPTION OF INCIDENT & CAUSE
708 See Attachments
2,410
VOLUME. .. DESCRIPTION OF INCIDENT & CAUSE ,
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
ACTION TAKEN TO ELIMINATE CAUSE, ,w
See Attachments
!a+
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
DATE
TIME
TOTAL
Unplanned Events < 1 Hour
Unplanned Events > 1 Hour
Assist
TOTAL FLARED VOLUME
VOLUME
0
TOTAL
254
3,118
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
15,678
beasti 0
19,050
DESCRIPTION OF INCIDENT & CAUSE
See Attachments
ACTION TAKEN TO EUMINATE CAUSE,,„
See Attachments
Par 1
8/9/2006
2:01 PM
FACILITY: GC3 DATE: 22 Jill 2006
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 01:15 06:55 5 Hrs 40Mins Foi ❑ ❑ 708 MSCF
2. Flare/Relief Valve 15:10 16:00 OHrs 50Mins ❑ ❑ ❑ 104 MSCF
TOTAL VOLUME 812 MSCF
First Determination of Cause:
1. Depressuring "A' Well Pad for shutdown work
REPORT NO: 06 -0341
BPXA FLARE REPORT
PRUDHOE BAY
2. Depressuring 'A' Well Pad LDF per Area Operator request.
Action Taken to Stop Flaring:
1. Once 'A" Well Pad was depressured and sated out; closed flare valve.
2. Closed flare valve once depressured.
Monday, July 31, 2006 Page 1 of 1
atiir
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC3 DATE: 30 Jul 2006
TIME OF FLARING
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 04:00 05:43 1 Hrs 43Mins ❑
First Determination of Cause:
1. Skid 18 Wet gas compressor K -5500 shut down.
Action Taken to Stop Flaring:
1. Skid 18 Wet gas compressor K -5500 re- started.
REPORT NO: 06-0371
Black
❑ ❑ 2,410 MSCF
TOTAL VOLUME 2,410 MSCF
Monday, July 31, 2006 Page 1 of 1
PBU FIELD SHUT DOWN
EXCESSIVE FLARING EVENT
(FS -1, FS -2, FS -3, GC -2 GC -3)
SEPTEMBER NOVEMBER
August & September 2006 the PBU field was shut down for an oil pipeline that was either cracked or corroded.
The Gas Disposition Facilities at PBU had excessive flaring for the 2 months because of the field being shut down.
A determination or hearing is being considered to determine if this excessive flaring of gas is a waste of resources
for each month.
Currently the agency has entered into the Gas Disposition database the data reported by the operator until AOGCC
makes a determination of the excessive gas flared. At this time, the agency has not made a determination as to the
status for the gas flared. Once a determination or hearing is completed the signed reports will be inserted in place
of the current report. The database will be revised and procedures handled properly to correct this gas disposition
excessive flaring event.
This page will be entered into each Gas Disposition Facility folder for the 2 months of excessive flaring until this
situation is corrected. This page will be removed along with the duplicate reports when the final determination is
made.
1 Facility
0290000033
I PB MAN Name
PB WOA
I BP � 15. Month/Veer ol Disposition 2006
Disposition
Volume MCF
20. For production from meals pool, 9m contribution at Oad1 pool as a psmsnt et
Total Volume.
6. SOId
0
Pod Name
Pool Code
Percent
7. noinpicod
0
PRUDHOE
640150
100.00%
8. Flared or vented hoer or kies
978
9. Flared or vented more than 1 dose (see test)
3,505
10. Pia and Purge
16,986
11. Used be lase operations
(specify In Remarks)
281,705
12. Oe1er foes keetrlea)ma)
0
AWgriaarial>t M.
Safety
MCF
13. TOTAL VOLUME (ITEMS 1.12)
303,174
Lease Use
MACE
14. NGL Gas Equlvese
0
egneentalke
MCF
15. Purchased gas
0
Was.:
MCF
18. Transferred horn:
0
Commissioner Outs
17. Tramisrred b: (Express as a negative 01 CGF
- 8,134,239
it Remarks: Block I I: Fuel Gas = 281,705 meek and Afsist Gas = 0 meet
I hereby catty that m. to .. . eve and cares b ,. .. a my knowledge
Stature �a� — i� - Tel Manager, Production Taxes and Royalty
Nob: All volumes must be
corrected to pressure o114.65 psis
and to a temperature of 60o F.
_ Aujppinv 20 AAC25.278,
Pn.
nd Nuns Bernard . Hajny Phone (907)5643 C 028 Date / ', d6
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Form 10.422 Rev. 1/2004
Submit in Duplicate
•
BP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
August 2006
(Unplanned Events less than or equal to 1 hour
DATE , -.- TIME _ . VOLUME DESCRIPTION OF INCIDENT at CAUSE _ ACTION TAKEN TO EUMNATE CAUSE
8/6/2006 0443 -0452 75 Not required for unplanned events .c= 1 hr Not required for unplanned events which
8/19/2006 1459- 1512 903
TOTAL 978
(Unplanned Events greater than 1 hour
a' DATE .: .„.,,, THE VOW**. DESCRIPTION OF INCIDENT & CAUSE, ACTION TAKEN TO ELIMINATE CAUSE
8/9/2006 1936 - 2400 92 See Attachments See Attachments
8/10/2006 0001 0615 52
8/14/2006 1040 -1940 750
8/23/2006 1452 -1800 2,611
TOTAL 3,505
'Planned Events Lass Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
Can 11ME VOLUME_ 00900T1ON INdt0ENT tenalt , AC11hNTAKENTOEt$WtNIE `t E.— ._ —,
See Attachments See Attachments
TOTAL 0
(Planned Events Exceeding 1 Hour OR Exceedln8 5000 Mcf
DATE. .....,._.._..., TIME, VOLUME, IP' WNOFINCIDENT &CAUSE. ACTIONTAKENTO e4A7E ' ,,,.., : , ;: I
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 978
Unplanned Events > 1 Hour 3,505
Planned Events c 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge MIR 1EASS
Assist Mai .!)I
TOTAL FLARED VOLUME 21,
1
Page 1
9/82006
4:58 PM
e
6
FACILITY: GC3 DATE: 09 Aug 2006
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1 Flare/ReliefValve 19:36 24 :00 4 Hrs 24Mins ❑ ❑ ❑ 92 MSCF
TOTAL VOLUME 92 MSCF
First Determination of Cause:
1. GC Reduced rates to 150 mmscfd due to transit oil line.
Action Taken to Stop Flaring:
1. Added assist gas to keep from black smoking.
REPORT NO: 06 -0392
BPXA FLARE REPORT
PRUDHOE BAY
Monday, August 28, 2006 Page 1 of 1
<IP
FACILITY: GC3 DATE: 10 At 19 2006
REPORT NO: 06 -0396
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 00:01 06:15 6Hrs 14Mins ❑ ❑ ❑ 52 MSCF
TOTAL VOLUME 52 MSCF
First Determination of Cause:
1. GC Reduced rates to 150 mmscfd due to transit oil line.
Action Taken to Stop Flaring:
1. Added assist gas to keep from black smoking.
Monday, August 28, 2006 Page 1 of 1
FACILITY: GC3 DATE: 14 Aug 2006
REPORT NO: 06 -0408
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 10:40 19:40 9 Hrs OMins ❑ ❑ ❑ 750 MSCF
TOTAL VOLUME 750 MSCF
First Determination of Cause:
1. Manually opened assist gas to promote clean buming
Action Taken to Stop Flaring:
1. Slowly closed off assist gas. Flare buming clean now.
Monday, August 28, 2006 Page 1 of 1
C�
FACILITY: GC3 DATE: 23 Aug 2006
TIME OF FLARING
SYSTEM Start Stop Duration
1. Flare/Relief Valve 14:52 18:00 3 Hrs SMins ❑
First Determination of Cause:
1. While moving old DCS cabinets two data hiways were damaged. K - 7001 S/D.
Action Taken to Stop Flaring:
1. Flaring continued while data hiways were repaired.
Wednesday, August 30, 2006
BPXA FLARE REPORT
PRUDHOE BAY
REPORT NO: 06 -0435
Black
Intermittent Smoke Planned VOLUME
❑ ❑ 2,611 MSCF
TOTAL VOLUME 2,611 MSCF
Page 1 of 1
GC3 Flaring
Iof1
Subject: GC3 Flaring
From: "GPB, Prod Opt TL" <GPBProdOptTL®BP.com>
Date: Thu, 24 Aug 2006 14:46:31 -0800
tat is t -_ " k ,
CCt "On); QOr
" XWO � r a y
�V�t �6,� � .�
cGary.Baason@BP: :?1eiftef, ,;.' a �`
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907-793-1241, fax 907- 276 -7542
From: Hat Tucker, Prod Optimization Team Leader (907- 659 -4472)
An extended flaring event occurred at GC3 on August 23. While moving a cabinet two data highways were damaged. GC3 was only producing
minimal rate to provide produced water to FS3 during the current PBU EOA shut down. Given the expected short duration for repairs to take
place, no additional production cuts were taken at GC3. Total flaring duration was 3 hours and 8 minutes, total volume was 2,611 MSCF.
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Production Optimization Team Leader
bp Exploration AK, Inc
(907) 659 -4472
8/24/2006 2.4R Pti
To Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 - 793 -1241, fax 907- 276 -7542
3 4,, kf
Subject: FW: GPB Flaring
From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>
Date: Sun, 20 Aug 2006 15:41:46 -0800
To: std mcmains@adntin.stste.ak.ti
CC: "GPB, Envirost TV' <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East"
<GPBEnvironAdvisarEast@a.coni >, "GPB, Environ Advisor West"
<GPBEnvironAdvisorWest@BP.com>, "Fiedler, Anne Mn <Affite.Fiedter@BP.coni>, "Benson, Gary
A" <Gmy.Benson@BP.coms, "Pfeifer, Jim'A" <Jim.Pfeiffer@BP.ce n >, "GPB, FS2/COTtJ Area a
Mgr" <GPBFS2TL@BP.coro , "GPB, Optimization Engr" <GPBOptimizationEng®BP.ccnP,
"GPB, FS1/SIP /STP Area Mgr" <GPBFStTL@$P.coffi >, "GPB, PS3 Area Mgr
<GPBFS3TLQBP.00m% "GPB, GO Area Mgr" <GPBGC2TL®0P.coin >, "GPB, GC2 OTL" :.
<gpbec2otl@BP.coi >, "GPB, GCI Area Mgr" <OPBGC1TL@BP.coai >, "GPB, GC3 Area Mgr"
<GPBGC3TL@BP.cmrt>, "Kurz, John" <john.kur @BPxxtm> ,E r. "i
From. Hal Tucker, Prod Optimization Team Leader (907 - 659 -4472)
Several extended flaring events have occurred at PBU over the last 2 weeks.
At FS1 an extended, intermittent, flaring event began on August 10 and ran through Aug 16. The cause
was low oil rates during the process of shutting in GPB due to the oil transit line integrity issue. The
decision was made to try and keep minimal amounts of fluid moving in the FS to maintain facility heat in
preparation for an extended shut down. Several high GOR wells were selected to remain on line to
provide maximum gas rate at minimum oil rate. At 4 - 5 mbod, there is not enough gas to allow the
STV /IP machine to stay loaded. When the ambient temperature dropped, FS1 was able to load up their
STV /IP machine and have been able to keep it loaded. System flaring began at 1652 hours on Aug 10
and continued intermittently until midnight Aug 16, for a total duration of 6 days, 7 hours and 7 minutes.
Total flared volume was 17,703 MSCF. During this time a 15 minute common line depressuring event
occurred - this volume is not included in the STV /IP event volume.
At FS2 an extended, intermittent, flare event occurred on Aug 6. FS2 was in the process of shutting
down due to the condition of their oil transmission line and began to intermittently flare when rates
became too low to allow the STV /IP machine to stay loaded. Stripping gas for TEG conditioning was cut
as the facility was shut down and flaring stopped. Total duration was 7 hours and 30 minutes; total
volume was 146 MSCF.
FS3 experienced three planned flaring events while depressuring for multiple, maintenance activities on
Aug 12. Maintenance was performed on the DS14 AL line, C -slug catcher, and the slug catcher gas
scrubber. Total duration for the depressuring was 4 hours and 21 minutes, total volume was 1,006
MSCF. Also, at FS3 on Aug 15, the B HP gas train required depressuring to repair a tube leak. Total
flaring (open to flare to maintain depressured status) duration was 23 hours, total volume was 173
MSCF.
At GC1 two extended flare events occurred. The first event occurred when the LP compressor surged
and unloaded. It took one hour for the LP machine to reload. Total flare duration was 1:00 hour, total
volume was 1,000 MSCF. The second event began on Aug 10 when the 36" line from Pt. Mac to GC1
was shut in and depressured due to a rig off the road near the 36" line. When the line was being brought
back into service a pressure surge knocked the line off several VSM's. The line was again depressured
to allow the line to be inspected. Total duration for depressuring the 36" line was 9 hours and 15
loft 1113,20063S7PM
• r ea r,uuua
minutes, total volume was 242 MSCF.
GC3 had two extended flaring events. Both were due to minimally increasing assist gas to ensure clean
burning flares. The first event began at 1936 on Aug 9 and lasted for 10 hours and 38 minutes. Total
volume for this event was 144 MSCF. The second event began at 1040 on Aug 14 and lasted fro 9
hours. Total volume for the second event was 750 MSCF.
CGF experienced two extended flaring events on Aug 10. The first event occurred at 1220 and was a
planned depressuring of LTS#1 to repair a valve seal leak. Depressuring took 3 hours and 4 minutes
and resulted in a total flare volume of 2,660 MSCF. The second event occurred at 1700 when MI
machine #2 shut down on low seal oil dp while swapping the MI Toad from MI #1 to MI #2. MI #2 was
depressured and secured resulting in a 1 hour and 27 minute flaring event. Total volume was 387
MSCF. The MI load was transferred back to MI #1.
If you require additional information, please don't hesitate to call me.
Hal Tucker
GPB Production Optimization Team Leader
bp Exploration AK, Inc
(907) 659 -4472
2 of 3 1113 13 2006 3:57 PM
1 Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
4 Operator S. Month/Year a Dapoaafon
BP f September -2006
PBU - WOA
Disposition
Volume MCF
20. For production from multiple pods, list contribution of each pool as a percent a
Total Volume.
6. Sod
0
Pool Name
Pool Code
Percent
7 Reinjected
0
PRUDHOE
840150
100.00%
S. Flared or vented 1 Hour or ass
587
/
9. Flared or vented more than 1 hour (see Instr.)
10
/
V
10. Pad and Purge
18,495
11. Used for lease operations (specify in Remarks)
270,214
Authorization >1 hr.
SaSafety
l Q
.
MCF
12. Other (sae Mstrucuda)
0
13. TOTAL VOLUME (ITEMS 612)
289,306
Lease Use
MCF
14 NGL Gas Equivalent
0
Conservation
MCF
15. Pnaehased gas
0
Wade:
MCF
16. Transferred from:
0
ag I �,
vt �LJ %Yt v J� X3,06
/ Commissioner Dots
17. Transferred to: (Express as a negative e) CGF
- 5,183,554
It Remarks: Block 11: Fuel Gas = 270,214 mscf and Assist Gas = 0 met
I hereby certify that the ®� the best d my knowledge.
Signature / / Title Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F.
Authority 20 AAC2S.235.
Printed Name Bernard W. Hajny Phone (907)564 -5028 Date _ .-v,—C‘...
Am
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
'Unplanned Events less than or equal to 1 hour
1
DATE ,. TIME _«- VOLUME DESCRIPTION OF INCIDENT & CAUSE - ,. ; ACTION TAKEN TO ELIMINATE CAUSE : - < a.,,ar,
9/9/2006 1203 - 1224 219 Not required for unplanned events <= 1 hr Not required for unplanned events which
9/15/2006 1138 -1147 125
9/26/2006 2140 -2157 118
9/27/2006 1516 -1522 125
TOTAL
Unplanned Events greater than 1 hour
1
DATE TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE,-_ ,_ ACTION TAKEN TO ELIMINATE CAUSE ,, ,_ .,. ,,,_
10 See Attachments
9/3/2006 0857 -1044
TOTAL
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
1
DATE_ TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSE -. ACTION TAKEN TO EUMINATE CAUSE,,„.
See Attachments
TOTAL
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
DATE _-. , _ TIME . -.,, VOLUME__ DESCRIPTION OF INCIDENT & CAUSE._ .. ACTION TAKEN TO ELIMINATE
See Attachments
TOTAL
587
10
0
0
TOTAL
Unplanned Events < 1 Hour 587
Unplanned Events > 1 Hour
Planned Events <1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Plot Purge MOM 18,485.
ASSist 0
TOTAL FLARED VOLUME 19,092
1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT -GC-3
GAS FLARING INCIDENT REPORT
September 2006
See Attachments
See Attachments
See Attachments
Page 1
10/11/2006
1:48 PM
FACILITY: GC3 DATE: 03 Sep 2006
Action Taken to Stop Flaring:
1. Finished depressuring vessel
BPXA FLARE REPORT
PRUDHOE BAY
REPORT NO: 06-0472
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 08:57 10:44 1 Hrs 47Mins ❑ ❑ ❑ 10 MSCF
TOTAL VOLUME 10 MSCF
First Determination of Cause:
1. De- pressuring A -1st stage separator for maintenance.
Wednesday, September 27, 2006 Page 1 of 1
1. Facility Number
0290000033
2 Facility Name
PBU GC 3
a Field
PBU - WOA
4. Operator 5 . Month/Year d OSpouiI ri
BP October -2006
Disposluon
Volume MCF
20. For production from multiple pods. list contribution of each pool as a percent of
Total gat*.
6. SOkI
0
Pool Name
Pod Code
Percent
7. ReknpctM
0
PRUDHOE
640150
100.00%
9. Flared or vented 1 how or less
8,681
1 hour (see Instr.)
9,756
9. Flared or vented more Nan
10. Pic and Purge
17,838
11. Used for lease operations (specify In Remarks)
374,778
12. Other (see instructions)
0
Authorization >1 hr
Safety
e r r /SG
MCF
13. TOTAL VOLUME (ITEMS 6-12)
411,053
Lease Use
MCF
14. NGL Gas Equivalent
0
Conseniadon
MCF
15. Purchased gas
0
Waste:
MCF
16. Transferred tom:
0
( / /`/D /�'w/ /
!``�� 1 2 —ice' O,ta
Comm ,e Dots
17. Transferred to: (Egress as a nepatNa e) CGF
- 21,847,662
7
18. Remarks Block I I: Fuel Gas = 374,778 mscf and Assist Gas = 0 mscf
I hereby candy that the foregoing is true and ec td the best of my knowledge.
/ 7
/j
Time Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
o a tempereture of 60o F.
t A uthortty 2_D AAC25
Signature
(((
Printed Name Bemard W. Hajny Phone (9o7)5e4 -sole Date 6 7? _ �end
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
10/24/2006 1545 -1615 6,250
TOTAL
10/13/2006 1147 -1253
10/13/2006 1324 - 2042
10/15/2006 2100 -2400
TOTAL
8,681
156
9,000
300
9,756
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
October 2006
1
'Unplanned Events less than or equal to 1 hour
DAT TIME ;p,� - . VOLUME, - DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE :: r _ -
10/10/2006 0300 - 0335 2,431 Not required for unplanned events a 1 hr
Not required for unplanned events which
1
'Unplanned Events greater than 1 hour
DATE TIME , VOLUME DESCRIPTION OF INCIDENT & CAUSE.,- ACTION TAKEN TO EUMINATE CAUSE
10/13/2006 1147 -1253 300 See Attachments
See Attachments
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
1
TIME,.
TOTAL
TIME
TOTAL
ISA TOTAL.
Unplanned Events c 1 Hour 8,681
Unplanned Event > 1 Hour 9,756
Planned Events c 1 hour and not 0
exceeding 5,000 MCF
Planned Event > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 17,83&
Assist O
TOTAL FLARED VOLUME 36.275
..,.
VOLUME DESCRIPTION OF INCIDENT 8 CAUSE
See Attachments
0
1
(Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
VOLUME OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE ,_,,,�,,, o „ ®
See Attachments
0
See Attachments
,,.. ACTION TAKEN TO ELIMINATE CAUSE leza
See Attachments
Page 1
11/9/2006
11:19 AM
Flare Start Date 10/1/2006
Flare End Date 10/31/2006
Report Number Date
Volume (MSCF)
System
06-89 Controlled Slowdown
300
06-89 Controlled Slowdown
156
06 -89 Controlled Blowdown
9000
Generated 11/2/2006
Time Of Flaring
Start Time
Action Taken
Determination Cause
Action Taken
GC3 Flare Report
Stop Time Duration Intermittent
06-77 Flare Relief 10/10/2008 3:00:00 AM 3:35:00 AM 35 minutes No No No BP1 \VAUGHNMD
Determination Cause LPS compressor K -7001 shutdown because of control/instrumentation
failure associated with power failure.
WOA reduced production rates and shut -in all wells due to field wide
power outage.
10/13/2006 11:47:00 AM 12:53:00 PM 66 minutes
No No No
Determination Cause Depreseured X -LDF and manifold due to gas release in manifold
building.
Action Taken Depressured LDF. (X -pad was already shutdown)
10/13/2006 11:47:00 AM 12:53:00 PM s 66 minutes No No No
Determination Cause Depreseured X -LDF and manifold due to gas release in manifold
building.
Action Taken Depressured LDF. (X -pad was already shutdown)
10/13/2006 1:24:00 PM 8:42:00 PM 438 minutes.. ; No No No
Restarting plant after 3 day shutdown due to power outage caused by
high winds. Unable to run compressors due to low gas rates. Assist
gas added to prevent black smoke.
Normal start - restarted compressors when sufficent rate
established for flow
Total Volume 18437
MSCF)
Black Smoke Planned Reported By
2431
BP1WIMESM
BP1WIMESM
BP IV-(IMESM
Daily Volume (MSCF) 9456
Page 2 of 3
Flare Start Date 10/1/2008
Flare End Date- 10/31/2806
'06-97 Controlled Blowdovm 10/15/2006 9.00:00 PM 12:00:00 AM 180 minutes No No No
BPIVACKSOWM 300
•
Determination Cause Depressured X-pad LDF for maintenance to repair leaking seals
X-ped was already shutdown)
Action Taken
IMF Depressured
c c 3
Daily Volume (MSCF) 300
06-119 Other 10/24/2006 3:45:00 PM 4:15:00 PM 30 minutes No No No BPIUGHNSOMT
Determination Cause LPS compressor K -7001 shutdown because of controtnnstrumentation
tailure.
Action Taken
Equipment was restarted at 1605 hours.
Daily Volume (MSCF) 6250
Total Volume 18437
MSCF)
Generated 11/2/2006 Page 3 of 3
GPB Gas Flaring Incidents
Subject: GPB Gas Flaring Incidents
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
Date: Thu, 19 Oct 2006 13:34:57 -0800
To: " steve _mcmains @admin.state.ak.us" <' steve _mcmains@admin.state.ak.us'>, "GPB, Environ TL" <GPBEnvironTL@BP.com >, "Fiedler,
Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com >, "GPB, GC1
Area Mgr" <GPBGC 1 TL@BP.com >, "GPB, GC3 Area Mgr" <GPBGC3TL@BP.com>, "GPB, Environ Advisor West"
<GPBEnvironAdvisorWest@BP.com>
To: Steve McMains, AOGCC
steve_mcmains @admin.state. ak. us
907 - 793 -1241, fax 907- 276 -7542
From: Michael Bolkovatz GPB Prod Optimization Team Leader
• GC3 event occurred on October 13th starting at 11:47 and lasted 1 hr 6 mins, total volume flared was 300
MSCF. Depressured X Pad for LDF repairs.
• GC3 event occurred on October 13th starting at 13:24 and lasted 7 hrs 18 mins, total volume flared was 9,000
MSCF. Plant start up, not enough gas to run LP and IP compressors.
• GC1 event occurred on October 13th starting at 12:10 and lasted 2 hrs 44 mins, total volume flared was 655
MSCF. Equalizing pressure around perimeter valves for starting GC -1.
• GC1 event occurred on October 13th starting at 16:00 and lasted 6 hrs 0 mins, total volume flared was 1,667
MSCF. Plant start up, not enough gas to run LP and IP compressors.
• GC1 event occurred on October 14th starting at 00:00 and lasted 22 hrs 49 mins, total volume flared was 9,507
MSCF. Plant start up, not enough gas to run LP and IP compressors.
• GC1 event occurred on October 14th starting at 12:10 and lasted 2 hrs 44 mins, total volume flared was 655
MSCF. Equalizing pressure around perimeter valves for starting GC -1.
• GC3 event occurred on October 15th starting at 21:00 and lasted 3 hr 0 mins, total volume flared was 300
MSCF. Depressured X Pad for LDF repairs.
1 of2 10/19/2006 2:36 PM
,GPB.Gas Flaring Incidents
2 of 2
If you require additional information, please don't hesitate to call.
Michael Bolkovatz
GPB Production Optimization TL
(907) 659-4472/5566
10/19/2006 2:36 PM
10 /I3 gas venting incident follow up
Subject: 10/13/06 GPB gas venting incident follow up
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
Date: Fri, 15 Dec 2006 10:42:21 -0900
To: steve mcmains@adtnin.state.ak.us>
« GPB Gas Flaring Incidents»
Subject: GPB Gas Flaring Incidents
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 - 793 -1241, fax 907- 276 -7542
From: Michael Bolkovatz, GPB Prod Optimization Team Leader
I'm following up per your phone request from yesterday.
X LDF is the 24" Large Diameter Flowline for X Pad. It is the gathering line that transports all oil/water /gas from the X ✓'
Pad wells to GC3.
The gas release that occurred on October 13 was on well X -01 and was the result of a failed pressure transmitter. The
Pad and wells were shutin on 10/10 as a result of the fieldwide power outage and the LDF had been displaced (for
freeze protection) and was mostly liquid filled. When the failure occurred, the remaining gas pressure on the LDF was
flared and that volume was estimated to be 300 MSCF (see email dated 10/19). At the time, we did not
estimate /calculate the volume of gas released inside the skid, but to the best of my knowledge and understanding of
the incident, the volume released in the skid would have been in the 10 MSCF range (the majority of the gas was
flared through the main flare line and the volume leaked into the skid was a result of a failed pressure sensing line).
If you require additional information, please don't hesitate to call me.
Michael Bolkovatz
GPB Prod Optimization Team Leader
(907) -659 -5566
I of3 12/15/2006 11:02 AM
1. Facility Number
0290000033
2. Facility Name
PBU GC 3
3. Field
PBU - WOA
t. Operate
(SP
5. Month/Year of Diep0810o11
November -2006
Disposition
Volume MCF
20. For production horn multiple pools, list contribution of each pool as percent of
Total Volume
5. 5010
0
Pod Name
Pool Code
Percent
7 Reinjected
0
PRUDHOE
640150
100.00%
8. Flared or vented l hour or less
222
9. Flared or vented more than 1 hour (see lnstr.)
0
10. Pilot and Purge
15,020
11. Used for lease operations (specify in Remarks)
476,128
1z. Other (see Instructions)
0
Authorization >t hr.
Safely
MCF
13. TOTAL VOLUME (ITEMS 612)
491,370
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
18. Transferred horn:
0
Commissioner
Date
17. Transferred to: (Express as a negative 1) CGF
- 20,006,453
18. Remarks: Block 11: Fuel Gas = 476,128 rasa and Assist Gas= 0 inset
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature � rive Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and ut a temperature 5.35. F.
Authority 711 AIU'26.235.
1 �
Print ed Name Bernard W. Han P hone (907)564 -5028 Date a2 /,S =a.(
Hajny �
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Subnit in Duplicate
(Unplanned Events less than or equal to 1 hour
1
DATE _._ TIME ,, VOLUME DESCRIPTION OF INCIDENT & CAUSE - ACTION TAKEN TO ELIMINATE CAUSE
11/6/2006 1013 - 1045 222 Not required for unplanned events <= 1 hr Not required for unplanned events which
TOTAL
222
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC -3
GAS FLARING INCIDENT REPORT
November 2006
(Unplanned Events greater than 1 hour
DATE N ,.,... -,.,,, 11ME
DATE
TOTAL
TOTAL
TOTAL
Unplanned Events c 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Pict Purge
Assist
TOTAL FLARED VOLUME
VOLUME DESCRIPTION OF INCIDENT & CAUSE- ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
0
(Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE„,,,,,,„,„,,,,,„„, ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
0
!Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
1
TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE, „.,., _ , ;._ ACTION TAKEN TO EUMINATE CAUSE _ y
See Attachments See Attachments
0
TOTAL
222
0
0
0
all
15,242
Pegs t
12/10/2006
4:53 PM
rtY
1. Facility Number
0290000033
12. Facility Name
M
PBU GC 3
3. Fleur
PBU - WOA
14. Operator
OW
BP
15. MontlWaar Disposition
December - 2006
Disposition
Volume MCF
20. For production from multiple pods, list contribution of each pod as a percent of
Total Volume
8. SOW
0
Pool Name
Pool Code
Percent
7 Reinjected
0
PRUDHOE
640150
100.00%
8. Flared or vented 1 hour or less
1,753
9. Flared or vented more than 1 how (see Instr.)
2,361 t/
7
10. Pad and Purge
18,945
11. Used for lease operations (specify in Remarks)
518,804
12. Other (sea klatrucaona)
0
Authorlsaton >1 hr
Safety
2 3�l
MCF
13. TOTAL VOLUME (ITEMS 8.12)
541 863
Lease Use
MCF
14. NGL Gas Equivalent
0
Conservation
MCF
15. Purwsed gas
0
Waste:
MCF
18. Transferred from:
0
,2 -5' -o7
61 4 79 saioneCorog
Data
nalenea m: (Express as a negative s) CGF
17. Tra pr
- 27,349,773
18. Remarks Block 11: Fuel Gas = 518,804 mscf and Assist Gas = 0 mscf
!hereby certify that the fore irq
Signature
le true and rted the best of my knowledge.
Tree Manager, Production Taxes and Royalty
Note: All volumes must be
corrected to pressure of 14.85 pale
and to a temperature of 600 F.
Authority 20 AAC25.235.
/o
Prim Pions Printed Name Bernard W. Haley (907)564-5028 Date � O �1
Form 10-422 Rev. 1 /2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Ba-
1
'Unplanned Events less than or equal to 1 hour
, DATE TIME VOLUME _ DESCRIPTION OF INCIDENT & CAUSE ,_ ACTION TAKEN TO ELIMINATE CAUSE
12/17/2006 0411 -0430 132 Not required for unplanned events c= 1 hr Not required for unplanned events which
12/22/2006 0857 -0928 1,184
12/23/2006 0250 -0305 229
12/27/2006 2214 2226 208
Unplanned Events c 1 Hour
Unplanned Events> 1 Hour
TOTAL
TOTAL
TOTAL.
TOTAL
1,753
(Unplanned Events greater than 1 hour
1
DATE .�, TIME ,,, ,, „, VOLUME, DESCRIPTION OF INCIDENT & CAUSE,,.,, — ACTION TAKEN TO EUMINATE CAUSE,
12 0853 -1043 23 See Attachments See Attachments
12/27/2006 0215 -0721 2,338
2,361
1
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mar
L nr DATE �, ste „, _ TIME, ,,, VOLUME,„., DESCRIPTION OF INCIDENT & CAUSE_ ACTION TAKEN TO ELIMINATE CAUSE
See Attachments
0
0
TOTAL
1,753
2,361
Planned Events c 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge MIL 18$46
Assist 0 , ,
TOTAL FLARED VOLUME 23
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-3
GAS FLARING INCIDENT REPORT
December 2006
See Attachments
See Attachments
1
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mot'
,�. DATE. _ TIME.,..„-,,,,. _ VOLUME,. DESCRIPTION OF INCIDENT & CAUSE. „.. ,. ACTION TAKEN TO EUMINATE CAUSE
See Attachments
Page 1
1/12/2007
10:29 AM
Flare Start Date 12/1/2006
Flare End Date 12/312006
GC3 Flare Report
Time Of Flaring
Report Number Date Start Time Stop Time Duration Intermittent / Black Smoke / Planned Reported By Volume (MSCF)
06-203 Flare Relief 12/8/2006 8:53:00 AM 10:43:00 AM 110 minutes No No No BP1 WAYNESBS
Determination Cause added assist pas to prevent flare pilots from blowing out due to high
winds.
Action Taken
tlaeased pit gas and shut oR assist gas.
06-223 Flare Relief 12/27/2006 2:15:00 AM 7:21:00 AM 306 minutes Yes
Determination Cause GC-3 S/D due to a bad PLC card in the LPS section, Well pads were
S/D and flaring alt slugcatcheis continued intermittently.
Action Taken
Equipment was restarted at 0730 hours. Card was replaced.
No No BPIVUALLERGW
23
2338
GPB Gas Flaring Incident
Subject: GPB Gas Flaring Incident
From: "GPB, Optimization Engr" <GPBOptimizationEngr @BP.com>
Date: Wed, 27 Dec 2006 09:33:12 -0900
To: sieve mcmains@admin.state.ak.us, "GPB, Environ TL" <GPBEnvironTL@BP.coni>> "GPB,
Environ Advisor East" <GPBEnvironAdvisorEast@BP.com >, "GPB, Environ Advisor West"
<GPBEnvironAdvisorWest@BP.com >, "Benson, Gary A" <Gary.Benson@BP.com >, "GPB, GC3
Area Mgr" <GPBGC3TL@BP.com >, "Kurz, John" <john.kurz@BP.com >, "Fiedler, Anne M"
<Anne.Fiedler@BP.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com >, "GPB, Prod Opt TL"
<GPBProdOptTL@BP.com>
CC: "GPB, Wells Opt Eng" <GPBWeltsOptEnga®13 ?.com5.
To: Steve McMains. AOGCC
steve_mcmains@admin.state.ak.us
907 - 793 -1241, fax 907 - 276 -7542
From: Beverly Luedke -Chan
Field Optimization Engineer
907 - 659 -4382
(Filling in for GPB Production Optimization Team Leader)
An extended gas flaring event occurred at GC3 plant on December 27. The GC3 Plant shutdown due to
a bad PLC card in the LPS section. Well pads were S/D and flaring off slugcatchers continued
intermittently from 02:15 until 07:21.
PLC card was replaced. Equipment was restarted at 07:30 hours. The total flared volume was 2.34
MMSCF.
If you require additional information, please don't hesitate to call.
Beverly Luedke -Chan (Dwight Warner, alternate)
Field Optimization Engineer
(907) 659-4382
(907) 659 -4236 pgr 553
1 of 1 12/27/2006 10:13 AM