Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPrudhoe Bay Unit GC 3 / BPSTATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2006 FACILITY: PBU GC 3 OPERATOR: BP EXPLORATION 1 Facility Number 2. Facility Name 3 Field PBU - WOA 4. Operator 8. MontiWwd Disposition BP January PBU GC 3 Disposition Volume MCF 20. For production from multiple pods, list contribution d each pool as a percent of Total Volume. A Solo 0 Pod Name Pool Code Percent 7. Rehyected 0 PRUDHOE 640150 100.00% 8. Flared or vented hour or less 453 1 Note (see inst.) 0 9. Faired or vented more than 10. Pilot and Ptsga 14,794 11. Used for base operations (specify In Remarks) 571,021 12. Other (see instructions) 0 Authorization >1 hr Safety MCF 13. TOTAL VOLUME (REMS 612) 586,268 Lease Use MCF 14. NGL Gas Eaivabm 0 Conservation MCF 1s. Purcneaed gas 0 Waste MCF 16. Transferred holm: 0 Commissioner Date 17. Transferred to: (Express as a negative a) CGF - 27,065,218 1e. Remarks Block 11: Fuel Gas = 571,021 rose( and Assist Gas = 0 mscf I hereby certify mat he foregoing is true and correct to the best of my knowledge. I _ ,{/�� SignatureY ¢ - � U time Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis e Authority 20 AAC25 23 F. 53. Printed Name Bemard . Hajny Phone (907)564-5028 Date 2-1C-66 Form 10.422 Rev 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 (Unplanned Events less than or equal to 1 hour DATE TIME - VOLUME DESCRIPTION OF INCIDENT & CAUSE 1/18/2006 0110 -0116 1/18/2006 0436 -0441 1/19/2006 0033 -0036 1/22/2006 2047 -2100 1/29/2006 2226 1 (Unplanned Events greater than 1 hour VOLUME_- DESCRIPTION OF INCIDENT & CAUSE - -- ACTION TAKEN TO EUMINATE CAUSE �.,,, ;; ,,.....�,,,,,, ;; �, ; See Attachments See Attachments DATE TOTAL TIME TOTAL TIME TOTAL Unplanned Events c 1 Hour Unplanned Events> 1 Hour Planned Events c 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pitt Purge Assist TOTAL FLARED VOLUME TOTAL VOLUME 167 Not required for unplanned events <= 1 hr 69 21 181 15 453 0 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE .- .. ;:.:..:.. ACTION TAKEN TO ELIMINATE CAUSE 0 1 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DESCRIPTION OF INCIDENT 6 CAUSE ACTON TAKEN TO ELIMINATE CAUSE _, - See Attachments 0 TOTAL 453 0 0 0 man 14,794; 0 15247 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT January 2006 See Attachments See Attachments ACTION TAKEN TO EUMINATE CAUSE Not required for unplanned events which See Attachments Page 1 2/8/1006 9:35 AM 1. Facility Number 0290000033 Z Facility Name PBU GC 3 3. Field 14. Operator BP BP 5. Mont Disppsltbrt February PBU - WOA Disposition Volume MCF n/ 20. For production from multiple pods, list contribution of each pod ass percent of Total Volume S. Sold 0 Pod Name Pod Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% / / ✓ 8. Flared or vented 1 NOW w ins 352 9 Flared or vented more than 1 hour (see rose.) 198 10. Pilot and Purps 12,571 11. Used for lease operations (specify in Remarks) 472,483 • .. '` : - Authorization >r M. .... `�-;+':: Selery - - MCF 12. Other (see instructions) 0 13. TOTAL VOLUME (ITEMS 8-12) 485,804 Lease Use 19t� MCF 14. NGL Gas Equivalent 0 , Conservation MCF 15. Purchased gas 0 Waste. F 16. Transferred front qqq [ / �/ z � / "' /, ' /� — Y� / � : VIA / 17. Transiened to: (Express as a negative e) CGF - 22,197,987 18. Remarks: Block l l: Fuel Gas = 472.483 rnscf and Assist Gas = 0 inset. I hereby Certify that the foregoing is hue an On the beet of my knowledge. Signature Tone Manager, Production Taxes and Royalty Date 7 — ? —��„ Note: All volumes must be corrected to pressure of 14.65 psla and to a temperature of 60o F. Authority 211 AACVS, 9 45. Printed Name Bemard . Halny Phone (907)584 -5028 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate (Unplanned Events Tess than or equal to 1 hour -_= DATE , TIME 2/18/2006 1418 -1432 2/19/2006 0014 0022 56 2/25/2006 2131 -2137 42 2/27/2006 0051 -0111 60 TOTAL (Unplanned Events greater than 1 hour 1 DATE 2/16/2006 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE,,,„,„,.,., 0810-0930 198 See Attachments TOTAL (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 TIME _.,�_ VOLUME' TOTAL 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 TIME - -: - -• VOLUME___ DESCRIPTION OF INCIDENT & CAUSE„,„,,,,,„, ACTION TAKEN TO EUMINATE See Attachments See Attachments TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Plarvied Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 352 198 0 0 TOTAL 352 198 0 0 - 12,5711 0I 13.121 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT • GC -3 GAS FLARING INCIDENT REPORT February 2006 VOLUME DESCRIPTION OF INCIDENT & CAUSE - 194 Not required for unplanned events c= 1 hr ACTION TAKEN TO EUMINATE CAUSE Not required for unplanned events which ACTON TAKEN TO ELIMINATE CAUSE__, See Attachments DESCRIPTION OF INCIDENT & CAUSE .. ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments Page 1 3/7/2006 10:18 AM C� FACILITY: GC3 DATE: 16 Feb 2006 REPORT NO: 06 -0087 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 08:10 09:30 ! Hrs tMins ® ® O 198 MSCF TOTAL VOLUME 198 MSCF First Determination of Cause: 1. At approx. 0810 hrs, it was reported from Gc rover that the burn pit was producing black smoke. This was not caused by process upset but by high ambient temps approx. 38F. Causing heavy ends in pipe mixing with purge gas causing incomplete combustion and black smoke. Action Taken to Stop Flaring: 1. Manually opened pv -03 -0611 Flare valve to burn pit and added assist gas to help burn cleaner. Not enough rate so flared from C -S /C which cleared the black smoke. Wednesday, February 22, 2006 Page 1 of 1 1. Facility Number I2. Facility Name 0290000033 I PBU GC 3 3 FIOId I4. PBU • WOA Oparatir ( BP 5. Mon tiWw a Disposition March -2006 Ofspeaitbn Volume MCF 20. For production from multipb pods, list onntntutkm of each pool as a percent of Total Volume 8. Sob 0 Pool Name Pool Cade Percent 7. 0 PRUDHOE 640150 100.00% 9. Flared or vented l hour or ass 3,570 9. Flared or vented more than 1 tar One insfrJ 0 10 Plot and Purge 15,170 11. used for base operations (specify in Remarks) 594,759 .. 12. Ottw (see instructions) Auearintbn >1 hr Safety MCF 13. TOTAL VOLUME (ITEMS 8-12) 613,499 LNN Use MCF 14. NGL Gos E4uhgk9ht 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 18. Transferred front 0 Commissioner Date 17. Tram d fene to: (Express as a negative e) CGF - 31,079,271 18. Remarks: Block I I: Fuel Gas = 594,759 mad and Assist Gas = 0 mscf i hereby certify that the foregoing b the teal of my knowledge. e rise Manager, Production Taxes and Royalty Signature Note: All volumes must tx corrected to pressure of 14.65 pule and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bemard W. Rainy Phone (907)564 -5028 Date i i /7 — Dh s Atm Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit In Duplicate (Unplanned Events less than or equal to 1 hour DATE TIME 3/4/2006 0153 - 0220 3/5/2006 0108 -0205 3/12/2006 2228 -2304 3/12/2006 2340 -2400 3/13/2006 0000-0007 3/13/2006 1040 -1110 3/13/2006 2000 -2022 3/28/2006 1032 -1039 TOTAL (Unplanned Events greater than 1 hour !Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met 1 ss DATE �v:...-. 1 TIME,. VOLUME DESCRIPTION OF INCIDENT & CAUSE _,.. „,..., ACTON TAKEN TO ELIMINATE CAUSE,,,,, ,,,,,.,. See Attachments TOTAL TIME,„ �ss+.„Tr, VOLUME. DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE ., e ,,.�,. See Attachments TOTAL (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME , DESCRIPTION OF INCIDENT & CAUSE . , ACTON TAKEN TO ELIMINATE CAUSE v .. m , ; ,„. ; �, « ,,..�,I See Attachments TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Planned Events < 1 hour and not exceeding 5000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 1 , VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTON TAKEN TO EUMINATE CAUSE - , tea -, 563 Not required for unplanned events <= 1 hr Not required for unplanned events which 625 1,075 167 29 729 319 63 3,570 0 0 0 TOTAL 3.570 0 0 0 Sill 15.1* • * 18.740 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC-3 GAS FLARING INCIDENT REPORT February 2006 See Attachments See Attachments See Attachments Pagel 4/10/2006 11:22 AM 1. Facility Nunbar 2. Facility Name 0290000033 I PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. Monft'sw d Disposition April Disposition Volume MCF / 20. For production from multiple pods, list contribution of each pod as • percent of Total Vdune e. Sold 0 Pod Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 456 9. flared oc vented more than 1 hour (see Instr.) 917 :/ 10. Not and Purge '� 14,444 11. Used for lease operations (specify in Remarks) 467,359 Authorization >1 hr. Safety t 1 MCF 12. Other (sae instructions) 0 13. TOTAL VOLUME (ITEMS 8-12) 483,176 Lease Use MCF 14. NGL Gas Equivalent Conservation MCF 75. Purchased gas 0 waste. MCF 0 . // / / /�',�� / ./'r 6 7 Y-.�' 7-14-06 are 18. Transferred from. 17. Transferred to: (Express as a negatives) CGF - 24,746,685 18. Remarks: Block 11: Fuel Gas = 467,359 rltscf and Assist Gas = 0 reef 1 hereby centfY that l ong is true and corn to at of my knowfed9e• ree Manager, Production Taxes and Royalty //__ Date Q 10 /� Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC °5.935. Signature Panted Name Bernard W. Hajny Phone (907)5e4-5028 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 'Unplanned Events less than or equal to 1 hour , DATE ,. TIME _ _ VOLUME- DESCRIPTION OF INCIDENT 8 CAUSE -.r _ ACTION TAKEN TO EUMINATE CAUSE .. ,,;„ 4/1/2006 0149 -0157 139 Not required for unplanned events <= 1 hr Not required for unplanned events which 4/25/2006 1036 -1115 217 4/25/2006 1342 -1400 100 TOTAL 1 (Unplanned Events greater than 1 hour DATE _ . .;. TIME a , -,_ VOLUME DESCRIPTION OF INCIDENT S CAUSE, - ACTON TAKEN TO EUMINATE CAUSE ,, ,�,:,,,..„ See Attachments 4/23/2006 1615 -1900 917 See Attachments _ DATE,„ TOTAL 1 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE = _ _. TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ,, ACTION TAKEN TO EUMINATE CAUSE See Attachments See Attachments TOTAL TIME TOTAL 456 917 0 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE _.,. ACTION TAKEN TO ELIMINATE CAUSE,,,..,,,,, See Attachments 0 TOTAL 458 Unplanned Events c 1 Hour Unplanned Events > 1 Hour 917 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge Des 14,444, Assist 11111nall Oj TOTAL FLARED VOLUME 15,817 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT April 2006 See Attachments Page 1 5/9/2008 10:30 AM FACILITY: GC3 DATE: 23 Apr 2006 First Determination of Cause: 1. LPS compressor K - 7000 Water Wash REPORT NO: 06-0228 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 16:15 19:00 21irs 45Mins 0 ❑ ❑ 917 MSCF TOTAL VOLUME 917 MSCF Action Taken to Stop Flaring: 1. Flaring was permitted to continue while GC operations/maintenence personnel completed Water Wash. Tuesday, April 25, 2006 Page 1 of 1 1 Facility Number 0290000033 2. Facility Name I PBU GC 3 3. Field 14. Operator PBU - WOA I BP S Month/Year of Disposition May - 2006 Diapostdoe Volume MCF / 20. For production from multiple pools, Nst contribution of each pool as a percent of Total Volume 6. Sold 0 Pool Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 100.00% 8. Flared err rented 1 moor or less 130 1 Pout Was re,) 1,434 V 9. Flared re Wined more than 10. Peot and Purge 15,819 11. Used tar lease operations (specify In Remarks) 481,690 12. Other (see Instructions) 0 Authorization >1 hr Salary ''/ l/ T'�T MCF 13. TOTAL VOLUME STEMS 6-12) 499,073 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 16. Transferred from: 0 p -1 . 06 on 17. Transferred to: (Express as a negate s) CGF - 21,439,685 1e. Remarks Block 11: Fuel Gas = 481,690 rnsef and Assist Gas = 0 tnscf I hereby certify that the for ' rap / Signature is tine and bast of my knowledge. Tice Manager, Production Taxes and Royalty e All r 4. corrected ted to pressure of f 1 14.65 5 be pule and to a temperature of 60o F. Authority 20 AAC25.235. Printed Name Bernard W. Hajny Phone (907)564 -5028 Date 6 - /2-.67 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 1 $Unplanned Events Tess than or equal to 1 hour DATE .... TIME: -- ___ VOLUME DESCRIPTION OF INCIDENT 6 CAUSE Ary ACTION TAKEN TO ELIMINATE CAUSE - -, :: .:: 5/2/2006 1406 -1426 130 Not required for unplanned events <= 1 hr Not required for unplanned events which 1 `Unplanned Events greater than 1 hour DATE TIME - , VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE 5/13/2006 1307 -1635 431 See Attachments See Attachments 5/16/2006 0300 -1502 1,003 1 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME, DESCRIPTION OF INCIDENT & CAUSE,,, ., ACTION TAKEN TO ELIMINATE CAUSE,, ,,,,, See Attachments DATE .,, x: TIME DATE exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL TOTAL 1,434 TOTAL TOTAL 130 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT May 2006 See Attachments 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf TIME DESCRIPTION OF INCIDENT & CAUSE . , ACTON TAKEN TO EUMINATE CAUSE__,. _ See Attachments See Attachments 0 TOTAL Unplanned Events c 1 Hour 130 Unplanned Events > 1 Hour 1,434 Planned Events c 1 hour and not 0 0 SWIM 10.810 ' a 0 17,383 Page 1 8/8/2008 1:40 PM i� FACILITY: GC3 DATE: 13 May 2006 BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 06 -0245 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 13:07 16:34 3 Hrs 27Mins ❑ ❑ ❑ 431 MSCF TOTAL VOLUME 431 MSCF First Determination of Cause: 1. PSV's on blowcases in snowshelter leaking into flare header, added assist gas to keep flare burning clean. Action Taken to Stop Flaring: 1. PSV crew called out to repair PSV's. When repaired stopped addeng assist gas. Wednesday, May 31, 2006 Page 1 of 1 t� FACILITY: GC3 DATE: 16 May 2006 REPORT NO: 06-0251 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/ReliefValve 03:00 15:02 12Hrs 2Mins ® ❑ ❑ 1,003 MSCF TOTAL VOLUME 1,003 MSCF First Determination of Cause: 1. B slugcatcher S/D and the skid 4a inlet leaked by opening the flare valve intermittently. Action Taken to Stop Flaring: 1. Troubleshoot slugcatcher S/D and got the S/D to clear. Outlet open and flare valve closed. Wednesday, May 31, 2006 Page 1 of 1 I. Facility Number 0290000033 `2. Facility Name IPBU GC 3 3 Field PBU - WOA 4. Operator BP 5. Month/Veer d Disposition June -2006 Disposition Volume MCF 20. For production from multiple pools list contribution of each pod as a percent of Taal Volume. 8. Soo 0 Pod Name Pool Code Percent 7. Reinjected 0 PRUDHOE 640150 100.00% 9. Flared or vented 1 hour or less 208 9. Flared or vented more than 1 hour (see Instr.) 0 10. P9a and Purge 16,178 11. Used for lease operations (specify In Remarks) 460,296 12. Other (see Instructions) 0 Authorization >1 hr Safety MCF 13. TOTAL VOLUME (ITEMS 6-12) 476,682 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MFG 15. Purchased gas 0 Waite: MCF 16. Transferred horn: 0 Commissioner Dees 17. Transferred to: (Express as a negative 5) COP - 22,283,131 1e. Remarks. Block II: Fuel Gas = 460,296 mscf and Assist Gas = 0 mscf 1 hereby codify that the toregoag is tam and the best of my knovnedge. Signature . Ali Tale Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis aand ut a temperature of 35. F. Authority 20 aac2sass. P Printed Name Bernard W. Hajny Phone (907)564-5028 Date 7 /f - v�„ Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate !Unplanned Events less than or equal to 1 hour DATE _ TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE -.. :- 2; . ., m ACTION TAKEN TO EUMINATE CAUSE 6/11/2006 0850-0950 208 Not required for unplanned events <= 1 hr Not required for unplanned events which TOTAL TOTAL 208 1 !Unplanned Events greater than 1 hour DATE VOLUME_ DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE See Attachments See Attachments 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT June 2006 1 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf VOLUME DESCRIPTION OF INCIDENT & CAUSE See Attachments DATE.. . TIME TOTAL 1 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ® DATE TIME S a VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE See Attachments See Attachments TOTAL Unplanned Events c 1 Hour Unplanned Events > 1 Hour Planned Events c 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 0 0 TOTAL. 208 0 0 0 18,1TSi 16.386 1 ACTION TAKEN TO EUMINATE CAUSE ,..,,,, q „,.,. See Attachments Pape 1 7/12/2006 9:54 AM Facility Number 0290000033 I1. 2. Facility Nan* PBU GC 3 3. Field PBU - WOA 4. Operator BP 5. Mormwee d Deposition July -2006 Disposition Volume MCF ✓ 20. For production from multiple pods, lbt CiontrIbutiOn Of eadl pod as a peened of Total Volume. 8. Sad 0 Pool Name Pool Code Percent 7 Rekpecto0 0 PRUDHOE 640150 100.00% 8. Flared or vented t hour or bas 254 1 hour (see keno.) 3,118 s. Flared or vented more man to. Not and Purge 15,878 11. Used for lease operations (specify in Remarks) 409,313 : r.' 12. Other (see kgtiwtbns) 0 Auti txl grl2atl >1 hr. Safety 3t tlt MCF 13. TOTAL VOLUME (tTEMS e-12) 428,363 Lease Use MCF it NGL Gas Equtvalem 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 18. Transferred from' 0 ale Ci/1 /y yj/(4 /� 49aa 17. Transferred b: (Emress as a negative a) CGF - 27,187,060 /r ta. Remarks. Block I l' Fuel Gas = 409,313 tnscf and Assist Gas = 0 mscf I hereby Certify that the foregoing is true and correct to the best of my knowledge. / M� � L in ' Signature 4 Tae Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 pale and to a temperature of 60o F. Authority 20 AAC25.235. J Footed Name Bernard W. Hajny Phone (907)56+ - 502e Date 8/ C/ 6 Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Ad- 1 'Unplanned Events less than or equal to 1 hour DATE TIME ; VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE idirioor 7/22/2006 1510 -1600 104 Not required tor unplanned events a 1 hr Not required tor unplanned events which 7/24/2006 1113 -1127 150 TOTAL 'Unplanned Events greater than 1 hour 1 DATE 7/22/2006 7/30/2006 TIME 0115 -0655 0400 -0543 TOTAL 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 DATE TIME TOTAL 254 3,118 0 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT June 2006 VOLUME DESCRIPTION OF INCIDENT & CAUSE 708 See Attachments 2,410 VOLUME. .. DESCRIPTION OF INCIDENT & CAUSE , See Attachments ACTION TAKEN TO ELIMINATE CAUSE See Attachments ACTION TAKEN TO ELIMINATE CAUSE, ,w See Attachments !a+ 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 DATE TIME TOTAL Unplanned Events < 1 Hour Unplanned Events > 1 Hour Assist TOTAL FLARED VOLUME VOLUME 0 TOTAL 254 3,118 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 15,678 beasti 0 19,050 DESCRIPTION OF INCIDENT & CAUSE See Attachments ACTION TAKEN TO EUMINATE CAUSE,,„ See Attachments Par 1 8/9/2006 2:01 PM FACILITY: GC3 DATE: 22 Jill 2006 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:15 06:55 5 Hrs 40Mins Foi ❑ ❑ 708 MSCF 2. Flare/Relief Valve 15:10 16:00 OHrs 50Mins ❑ ❑ ❑ 104 MSCF TOTAL VOLUME 812 MSCF First Determination of Cause: 1. Depressuring "A' Well Pad for shutdown work REPORT NO: 06 -0341 BPXA FLARE REPORT PRUDHOE BAY 2. Depressuring 'A' Well Pad LDF per Area Operator request. Action Taken to Stop Flaring: 1. Once 'A" Well Pad was depressured and sated out; closed flare valve. 2. Closed flare valve once depressured. Monday, July 31, 2006 Page 1 of 1 atiir BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC3 DATE: 30 Jul 2006 TIME OF FLARING SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 04:00 05:43 1 Hrs 43Mins ❑ First Determination of Cause: 1. Skid 18 Wet gas compressor K -5500 shut down. Action Taken to Stop Flaring: 1. Skid 18 Wet gas compressor K -5500 re- started. REPORT NO: 06-0371 Black ❑ ❑ 2,410 MSCF TOTAL VOLUME 2,410 MSCF Monday, July 31, 2006 Page 1 of 1 PBU FIELD SHUT DOWN EXCESSIVE FLARING EVENT (FS -1, FS -2, FS -3, GC -2 GC -3) SEPTEMBER NOVEMBER August & September 2006 the PBU field was shut down for an oil pipeline that was either cracked or corroded. The Gas Disposition Facilities at PBU had excessive flaring for the 2 months because of the field being shut down. A determination or hearing is being considered to determine if this excessive flaring of gas is a waste of resources for each month. Currently the agency has entered into the Gas Disposition database the data reported by the operator until AOGCC makes a determination of the excessive gas flared. At this time, the agency has not made a determination as to the status for the gas flared. Once a determination or hearing is completed the signed reports will be inserted in place of the current report. The database will be revised and procedures handled properly to correct this gas disposition excessive flaring event. This page will be entered into each Gas Disposition Facility folder for the 2 months of excessive flaring until this situation is corrected. This page will be removed along with the duplicate reports when the final determination is made. 1 Facility 0290000033 I PB MAN Name PB WOA I BP � 15. Month/Veer ol Disposition 2006 Disposition Volume MCF 20. For production from meals pool, 9m contribution at Oad1 pool as a psmsnt et Total Volume. 6. SOId 0 Pod Name Pool Code Percent 7. noinpicod 0 PRUDHOE 640150 100.00% 8. Flared or vented hoer or kies 978 9. Flared or vented more than 1 dose (see test) 3,505 10. Pia and Purge 16,986 11. Used be lase operations (specify In Remarks) 281,705 12. Oe1er foes keetrlea)ma) 0 AWgriaarial>t M. Safety MCF 13. TOTAL VOLUME (ITEMS 1.12) 303,174 Lease Use MACE 14. NGL Gas Equlvese 0 egneentalke MCF 15. Purchased gas 0 Was.: MCF 18. Transferred horn: 0 Commissioner Outs 17. Tramisrred b: (Express as a negative 01 CGF - 8,134,239 it Remarks: Block I I: Fuel Gas = 281,705 meek and Afsist Gas = 0 meet I hereby catty that m. to .. . eve and cares b ,. .. a my knowledge Stature �a� — i� - Tel Manager, Production Taxes and Royalty Nob: All volumes must be corrected to pressure o114.65 psis and to a temperature of 60o F. _ Aujppinv 20 AAC25.278, Pn. nd Nuns Bernard . Hajny Phone (907)5643 C 028 Date / ', d6 • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Form 10.422 Rev. 1/2004 Submit in Duplicate • BP EXPLORATION (ALASKA) INC. PRUDHOE SAY UNIT - GC-3 GAS FLARING INCIDENT REPORT August 2006 (Unplanned Events less than or equal to 1 hour DATE , -.- TIME _ . VOLUME DESCRIPTION OF INCIDENT at CAUSE _ ACTION TAKEN TO EUMNATE CAUSE 8/6/2006 0443 -0452 75 Not required for unplanned events .c= 1 hr Not required for unplanned events which 8/19/2006 1459- 1512 903 TOTAL 978 (Unplanned Events greater than 1 hour a' DATE .: .„.,,, THE VOW**. DESCRIPTION OF INCIDENT & CAUSE, ACTION TAKEN TO ELIMINATE CAUSE 8/9/2006 1936 - 2400 92 See Attachments See Attachments 8/10/2006 0001 0615 52 8/14/2006 1040 -1940 750 8/23/2006 1452 -1800 2,611 TOTAL 3,505 'Planned Events Lass Than or Equal 1 Hour AND Not Exceeding 5000 Mcf Can 11ME VOLUME_ 00900T1ON INdt0ENT tenalt , AC11hNTAKENTOEt$WtNIE `t E.— ._ —, See Attachments See Attachments TOTAL 0 (Planned Events Exceeding 1 Hour OR Exceedln8 5000 Mcf DATE. .....,._.._..., TIME, VOLUME, IP' WNOFINCIDENT &CAUSE. ACTIONTAKENTO e4A7E ' ,,,.., : , ;: I See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 978 Unplanned Events > 1 Hour 3,505 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge MIR 1EASS Assist Mai .!)I TOTAL FLARED VOLUME 21, 1 Page 1 9/82006 4:58 PM e 6 FACILITY: GC3 DATE: 09 Aug 2006 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1 Flare/ReliefValve 19:36 24 :00 4 Hrs 24Mins ❑ ❑ ❑ 92 MSCF TOTAL VOLUME 92 MSCF First Determination of Cause: 1. GC Reduced rates to 150 mmscfd due to transit oil line. Action Taken to Stop Flaring: 1. Added assist gas to keep from black smoking. REPORT NO: 06 -0392 BPXA FLARE REPORT PRUDHOE BAY Monday, August 28, 2006 Page 1 of 1 <IP FACILITY: GC3 DATE: 10 At 19 2006 REPORT NO: 06 -0396 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:01 06:15 6Hrs 14Mins ❑ ❑ ❑ 52 MSCF TOTAL VOLUME 52 MSCF First Determination of Cause: 1. GC Reduced rates to 150 mmscfd due to transit oil line. Action Taken to Stop Flaring: 1. Added assist gas to keep from black smoking. Monday, August 28, 2006 Page 1 of 1 FACILITY: GC3 DATE: 14 Aug 2006 REPORT NO: 06 -0408 BPXA FLARE REPORT PRUDHOE BAY TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 10:40 19:40 9 Hrs OMins ❑ ❑ ❑ 750 MSCF TOTAL VOLUME 750 MSCF First Determination of Cause: 1. Manually opened assist gas to promote clean buming Action Taken to Stop Flaring: 1. Slowly closed off assist gas. Flare buming clean now. Monday, August 28, 2006 Page 1 of 1 C� FACILITY: GC3 DATE: 23 Aug 2006 TIME OF FLARING SYSTEM Start Stop Duration 1. Flare/Relief Valve 14:52 18:00 3 Hrs SMins ❑ First Determination of Cause: 1. While moving old DCS cabinets two data hiways were damaged. K - 7001 S/D. Action Taken to Stop Flaring: 1. Flaring continued while data hiways were repaired. Wednesday, August 30, 2006 BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 06 -0435 Black Intermittent Smoke Planned VOLUME ❑ ❑ 2,611 MSCF TOTAL VOLUME 2,611 MSCF Page 1 of 1 GC3 Flaring Iof1 Subject: GC3 Flaring From: "GPB, Prod Opt TL" <GPBProdOptTL®BP.com> Date: Thu, 24 Aug 2006 14:46:31 -0800 tat is t -_ " k , CCt "On); QOr " XWO � r a y �V�t �6,� � .� cGary.Baason@BP: :?1eiftef, ,;.' a �` To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907-793-1241, fax 907- 276 -7542 From: Hat Tucker, Prod Optimization Team Leader (907- 659 -4472) An extended flaring event occurred at GC3 on August 23. While moving a cabinet two data highways were damaged. GC3 was only producing minimal rate to provide produced water to FS3 during the current PBU EOA shut down. Given the expected short duration for repairs to take place, no additional production cuts were taken at GC3. Total flaring duration was 3 hours and 8 minutes, total volume was 2,611 MSCF. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization Team Leader bp Exploration AK, Inc (907) 659 -4472 8/24/2006 2.4R Pti To Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907- 276 -7542 3 4,, kf Subject: FW: GPB Flaring From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com> Date: Sun, 20 Aug 2006 15:41:46 -0800 To: std mcmains@adntin.stste.ak.ti CC: "GPB, Envirost TV' <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisarEast@a.coni >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>, "Fiedler, Anne Mn <Affite.Fiedter@BP.coni>, "Benson, Gary A" <Gmy.Benson@BP.coms, "Pfeifer, Jim'A" <Jim.Pfeiffer@BP.ce n >, "GPB, FS2/COTtJ Area a Mgr" <GPBFS2TL@BP.coro , "GPB, Optimization Engr" <GPBOptimizationEng®BP.ccnP, "GPB, FS1/SIP /STP Area Mgr" <GPBFStTL@$P.coffi >, "GPB, PS3 Area Mgr <GPBFS3TLQBP.00m% "GPB, GO Area Mgr" <GPBGC2TL®0P.coin >, "GPB, GC2 OTL" :. <gpbec2otl@BP.coi >, "GPB, GCI Area Mgr" <OPBGC1TL@BP.coai >, "GPB, GC3 Area Mgr" <GPBGC3TL@BP.cmrt>, "Kurz, John" <john.kur @BPxxtm> ,E r. "i From. Hal Tucker, Prod Optimization Team Leader (907 - 659 -4472) Several extended flaring events have occurred at PBU over the last 2 weeks. At FS1 an extended, intermittent, flaring event began on August 10 and ran through Aug 16. The cause was low oil rates during the process of shutting in GPB due to the oil transit line integrity issue. The decision was made to try and keep minimal amounts of fluid moving in the FS to maintain facility heat in preparation for an extended shut down. Several high GOR wells were selected to remain on line to provide maximum gas rate at minimum oil rate. At 4 - 5 mbod, there is not enough gas to allow the STV /IP machine to stay loaded. When the ambient temperature dropped, FS1 was able to load up their STV /IP machine and have been able to keep it loaded. System flaring began at 1652 hours on Aug 10 and continued intermittently until midnight Aug 16, for a total duration of 6 days, 7 hours and 7 minutes. Total flared volume was 17,703 MSCF. During this time a 15 minute common line depressuring event occurred - this volume is not included in the STV /IP event volume. At FS2 an extended, intermittent, flare event occurred on Aug 6. FS2 was in the process of shutting down due to the condition of their oil transmission line and began to intermittently flare when rates became too low to allow the STV /IP machine to stay loaded. Stripping gas for TEG conditioning was cut as the facility was shut down and flaring stopped. Total duration was 7 hours and 30 minutes; total volume was 146 MSCF. FS3 experienced three planned flaring events while depressuring for multiple, maintenance activities on Aug 12. Maintenance was performed on the DS14 AL line, C -slug catcher, and the slug catcher gas scrubber. Total duration for the depressuring was 4 hours and 21 minutes, total volume was 1,006 MSCF. Also, at FS3 on Aug 15, the B HP gas train required depressuring to repair a tube leak. Total flaring (open to flare to maintain depressured status) duration was 23 hours, total volume was 173 MSCF. At GC1 two extended flare events occurred. The first event occurred when the LP compressor surged and unloaded. It took one hour for the LP machine to reload. Total flare duration was 1:00 hour, total volume was 1,000 MSCF. The second event began on Aug 10 when the 36" line from Pt. Mac to GC1 was shut in and depressured due to a rig off the road near the 36" line. When the line was being brought back into service a pressure surge knocked the line off several VSM's. The line was again depressured to allow the line to be inspected. Total duration for depressuring the 36" line was 9 hours and 15 loft 1113,20063S7PM • r ea r,uuua minutes, total volume was 242 MSCF. GC3 had two extended flaring events. Both were due to minimally increasing assist gas to ensure clean burning flares. The first event began at 1936 on Aug 9 and lasted for 10 hours and 38 minutes. Total volume for this event was 144 MSCF. The second event began at 1040 on Aug 14 and lasted fro 9 hours. Total volume for the second event was 750 MSCF. CGF experienced two extended flaring events on Aug 10. The first event occurred at 1220 and was a planned depressuring of LTS#1 to repair a valve seal leak. Depressuring took 3 hours and 4 minutes and resulted in a total flare volume of 2,660 MSCF. The second event occurred at 1700 when MI machine #2 shut down on low seal oil dp while swapping the MI Toad from MI #1 to MI #2. MI #2 was depressured and secured resulting in a 1 hour and 27 minute flaring event. Total volume was 387 MSCF. The MI load was transferred back to MI #1. If you require additional information, please don't hesitate to call me. Hal Tucker GPB Production Optimization Team Leader bp Exploration AK, Inc (907) 659 -4472 2 of 3 1113 13 2006 3:57 PM 1 Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field 4 Operator S. Month/Year a Dapoaafon BP f September -2006 PBU - WOA Disposition Volume MCF 20. For production from multiple pods, list contribution of each pool as a percent a Total Volume. 6. Sod 0 Pool Name Pool Code Percent 7 Reinjected 0 PRUDHOE 840150 100.00% S. Flared or vented 1 Hour or ass 587 / 9. Flared or vented more than 1 hour (see Instr.) 10 / V 10. Pad and Purge 18,495 11. Used for lease operations (specify in Remarks) 270,214 Authorization >1 hr. SaSafety l Q . MCF 12. Other (sae Mstrucuda) 0 13. TOTAL VOLUME (ITEMS 612) 289,306 Lease Use MCF 14 NGL Gas Equivalent 0 Conservation MCF 15. Pnaehased gas 0 Wade: MCF 16. Transferred from: 0 ag I �, vt �LJ %Yt v J� X3,06 / Commissioner Dots 17. Transferred to: (Express as a negative e) CGF - 5,183,554 It Remarks: Block 11: Fuel Gas = 270,214 mscf and Assist Gas = 0 met I hereby certify that the ®� the best d my knowledge. Signature / / Title Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60o F. Authority 20 AAC2S.235. Printed Name Bernard W. Hajny Phone (907)564 -5028 Date _ .-v,—C‘... Am Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 'Unplanned Events less than or equal to 1 hour 1 DATE ,. TIME _«- VOLUME DESCRIPTION OF INCIDENT & CAUSE - ,. ; ACTION TAKEN TO ELIMINATE CAUSE : - < a.,,ar, 9/9/2006 1203 - 1224 219 Not required for unplanned events <= 1 hr Not required for unplanned events which 9/15/2006 1138 -1147 125 9/26/2006 2140 -2157 118 9/27/2006 1516 -1522 125 TOTAL Unplanned Events greater than 1 hour 1 DATE TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE,-_ ,_ ACTION TAKEN TO ELIMINATE CAUSE ,, ,_ .,. ,,,_ 10 See Attachments 9/3/2006 0857 -1044 TOTAL 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 1 DATE_ TIME VOLUME. DESCRIPTION OF INCIDENT & CAUSE -. ACTION TAKEN TO EUMINATE CAUSE,,„. See Attachments TOTAL 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 DATE _-. , _ TIME . -.,, VOLUME__ DESCRIPTION OF INCIDENT & CAUSE._ .. ACTION TAKEN TO ELIMINATE See Attachments TOTAL 587 10 0 0 TOTAL Unplanned Events < 1 Hour 587 Unplanned Events > 1 Hour Planned Events <1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Plot Purge MOM 18,485. ASSist 0 TOTAL FLARED VOLUME 19,092 1 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT -GC-3 GAS FLARING INCIDENT REPORT September 2006 See Attachments See Attachments See Attachments Page 1 10/11/2006 1:48 PM FACILITY: GC3 DATE: 03 Sep 2006 Action Taken to Stop Flaring: 1. Finished depressuring vessel BPXA FLARE REPORT PRUDHOE BAY REPORT NO: 06-0472 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 08:57 10:44 1 Hrs 47Mins ❑ ❑ ❑ 10 MSCF TOTAL VOLUME 10 MSCF First Determination of Cause: 1. De- pressuring A -1st stage separator for maintenance. Wednesday, September 27, 2006 Page 1 of 1 1. Facility Number 0290000033 2 Facility Name PBU GC 3 a Field PBU - WOA 4. Operator 5 . Month/Year d OSpouiI ri BP October -2006 Disposluon Volume MCF 20. For production from multiple pods. list contribution of each pool as a percent of Total gat*. 6. SOkI 0 Pool Name Pod Code Percent 7. ReknpctM 0 PRUDHOE 640150 100.00% 9. Flared or vented 1 how or less 8,681 1 hour (see Instr.) 9,756 9. Flared or vented more Nan 10. Pic and Purge 17,838 11. Used for lease operations (specify In Remarks) 374,778 12. Other (see instructions) 0 Authorization >1 hr Safety e r r /SG MCF 13. TOTAL VOLUME (ITEMS 6-12) 411,053 Lease Use MCF 14. NGL Gas Equivalent 0 Conseniadon MCF 15. Purchased gas 0 Waste: MCF 16. Transferred tom: 0 ( / /`/D /�'w/ / !``�� 1 2 —ice' O,ta Comm ,e Dots 17. Transferred to: (Egress as a nepatNa e) CGF - 21,847,662 7 18. Remarks Block I I: Fuel Gas = 374,778 mscf and Assist Gas = 0 mscf I hereby candy that the foregoing is true and ec td the best of my knowledge. / 7 /j Time Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis o a tempereture of 60o F. t A uthortty 2_D AAC25 Signature ((( Printed Name Bemard W. Hajny Phone (9o7)5e4 -sole Date 6 7? _ �end Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate 10/24/2006 1545 -1615 6,250 TOTAL 10/13/2006 1147 -1253 10/13/2006 1324 - 2042 10/15/2006 2100 -2400 TOTAL 8,681 156 9,000 300 9,756 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT October 2006 1 'Unplanned Events less than or equal to 1 hour DAT TIME ;p,� - . VOLUME, - DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE :: r _ - 10/10/2006 0300 - 0335 2,431 Not required for unplanned events a 1 hr Not required for unplanned events which 1 'Unplanned Events greater than 1 hour DATE TIME , VOLUME DESCRIPTION OF INCIDENT & CAUSE.,- ACTION TAKEN TO EUMINATE CAUSE 10/13/2006 1147 -1253 300 See Attachments See Attachments (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met 1 TIME,. TOTAL TIME TOTAL ISA TOTAL. Unplanned Events c 1 Hour 8,681 Unplanned Event > 1 Hour 9,756 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Event > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 17,83& Assist O TOTAL FLARED VOLUME 36.275 ..,. VOLUME DESCRIPTION OF INCIDENT 8 CAUSE See Attachments 0 1 (Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf VOLUME OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE ,_,,,�,,, o „ ® See Attachments 0 See Attachments ,,.. ACTION TAKEN TO ELIMINATE CAUSE leza See Attachments Page 1 11/9/2006 11:19 AM Flare Start Date 10/1/2006 Flare End Date 10/31/2006 Report Number Date Volume (MSCF) System 06-89 Controlled Slowdown 300 06-89 Controlled Slowdown 156 06 -89 Controlled Blowdown 9000 Generated 11/2/2006 Time Of Flaring Start Time Action Taken Determination Cause Action Taken GC3 Flare Report Stop Time Duration Intermittent 06-77 Flare Relief 10/10/2008 3:00:00 AM 3:35:00 AM 35 minutes No No No BP1 \VAUGHNMD Determination Cause LPS compressor K -7001 shutdown because of control/instrumentation failure associated with power failure. WOA reduced production rates and shut -in all wells due to field wide power outage. 10/13/2006 11:47:00 AM 12:53:00 PM 66 minutes No No No Determination Cause Depreseured X -LDF and manifold due to gas release in manifold building. Action Taken Depressured LDF. (X -pad was already shutdown) 10/13/2006 11:47:00 AM 12:53:00 PM s 66 minutes No No No Determination Cause Depreseured X -LDF and manifold due to gas release in manifold building. Action Taken Depressured LDF. (X -pad was already shutdown) 10/13/2006 1:24:00 PM 8:42:00 PM 438 minutes.. ; No No No Restarting plant after 3 day shutdown due to power outage caused by high winds. Unable to run compressors due to low gas rates. Assist gas added to prevent black smoke. Normal start - restarted compressors when sufficent rate established for flow Total Volume 18437 MSCF) Black Smoke Planned Reported By 2431 BP1WIMESM BP1WIMESM BP IV-(IMESM Daily Volume (MSCF) 9456 Page 2 of 3 Flare Start Date 10/1/2008 Flare End Date- 10/31/2806 '06-97 Controlled Blowdovm 10/15/2006 9.00:00 PM 12:00:00 AM 180 minutes No No No BPIVACKSOWM 300 • Determination Cause Depressured X-pad LDF for maintenance to repair leaking seals X-ped was already shutdown) Action Taken IMF Depressured c c 3 Daily Volume (MSCF) 300 06-119 Other 10/24/2006 3:45:00 PM 4:15:00 PM 30 minutes No No No BPIUGHNSOMT Determination Cause LPS compressor K -7001 shutdown because of controtnnstrumentation tailure. Action Taken Equipment was restarted at 1605 hours. Daily Volume (MSCF) 6250 Total Volume 18437 MSCF) Generated 11/2/2006 Page 3 of 3 GPB Gas Flaring Incidents Subject: GPB Gas Flaring Incidents From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> Date: Thu, 19 Oct 2006 13:34:57 -0800 To: " steve _mcmains @admin.state.ak.us" <' steve _mcmains@admin.state.ak.us'>, "GPB, Environ TL" <GPBEnvironTL@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary A" <Gary.Benson @BP.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com >, "GPB, GC1 Area Mgr" <GPBGC 1 TL@BP.com >, "GPB, GC3 Area Mgr" <GPBGC3TL@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com> To: Steve McMains, AOGCC steve_mcmains @admin.state. ak. us 907 - 793 -1241, fax 907- 276 -7542 From: Michael Bolkovatz GPB Prod Optimization Team Leader • GC3 event occurred on October 13th starting at 11:47 and lasted 1 hr 6 mins, total volume flared was 300 MSCF. Depressured X Pad for LDF repairs. • GC3 event occurred on October 13th starting at 13:24 and lasted 7 hrs 18 mins, total volume flared was 9,000 MSCF. Plant start up, not enough gas to run LP and IP compressors. • GC1 event occurred on October 13th starting at 12:10 and lasted 2 hrs 44 mins, total volume flared was 655 MSCF. Equalizing pressure around perimeter valves for starting GC -1. • GC1 event occurred on October 13th starting at 16:00 and lasted 6 hrs 0 mins, total volume flared was 1,667 MSCF. Plant start up, not enough gas to run LP and IP compressors. • GC1 event occurred on October 14th starting at 00:00 and lasted 22 hrs 49 mins, total volume flared was 9,507 MSCF. Plant start up, not enough gas to run LP and IP compressors. • GC1 event occurred on October 14th starting at 12:10 and lasted 2 hrs 44 mins, total volume flared was 655 MSCF. Equalizing pressure around perimeter valves for starting GC -1. • GC3 event occurred on October 15th starting at 21:00 and lasted 3 hr 0 mins, total volume flared was 300 MSCF. Depressured X Pad for LDF repairs. 1 of2 10/19/2006 2:36 PM ,GPB.Gas Flaring Incidents 2 of 2 If you require additional information, please don't hesitate to call. Michael Bolkovatz GPB Production Optimization TL (907) 659-4472/5566 10/19/2006 2:36 PM 10 /I3 gas venting incident follow up Subject: 10/13/06 GPB gas venting incident follow up From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> Date: Fri, 15 Dec 2006 10:42:21 -0900 To: steve mcmains@adtnin.state.ak.us> « GPB Gas Flaring Incidents» Subject: GPB Gas Flaring Incidents To: Steve McMains, AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907- 276 -7542 From: Michael Bolkovatz, GPB Prod Optimization Team Leader I'm following up per your phone request from yesterday. X LDF is the 24" Large Diameter Flowline for X Pad. It is the gathering line that transports all oil/water /gas from the X ✓' Pad wells to GC3. The gas release that occurred on October 13 was on well X -01 and was the result of a failed pressure transmitter. The Pad and wells were shutin on 10/10 as a result of the fieldwide power outage and the LDF had been displaced (for freeze protection) and was mostly liquid filled. When the failure occurred, the remaining gas pressure on the LDF was flared and that volume was estimated to be 300 MSCF (see email dated 10/19). At the time, we did not estimate /calculate the volume of gas released inside the skid, but to the best of my knowledge and understanding of the incident, the volume released in the skid would have been in the 10 MSCF range (the majority of the gas was flared through the main flare line and the volume leaked into the skid was a result of a failed pressure sensing line). If you require additional information, please don't hesitate to call me. Michael Bolkovatz GPB Prod Optimization Team Leader (907) -659 -5566 I of3 12/15/2006 11:02 AM 1. Facility Number 0290000033 2. Facility Name PBU GC 3 3. Field PBU - WOA t. Operate (SP 5. Month/Year of Diep0810o11 November -2006 Disposition Volume MCF 20. For production horn multiple pools, list contribution of each pool as percent of Total Volume 5. 5010 0 Pod Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented l hour or less 222 9. Flared or vented more than 1 hour (see lnstr.) 0 10. Pilot and Purge 15,020 11. Used for lease operations (specify in Remarks) 476,128 1z. Other (see Instructions) 0 Authorization >t hr. Safely MCF 13. TOTAL VOLUME (ITEMS 612) 491,370 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purchased gas 0 Waste: MCF 18. Transferred horn: 0 Commissioner Date 17. Transferred to: (Express as a negative 1) CGF - 20,006,453 18. Remarks: Block 11: Fuel Gas = 476,128 rasa and Assist Gas= 0 inset I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature � rive Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.65 psis and ut a temperature 5.35. F. Authority 711 AIU'26.235. 1 � Print ed Name Bernard W. Han P hone (907)564 -5028 Date a2 /,S =a.( Hajny � Form 10-422 Rev. 1/2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Subnit in Duplicate (Unplanned Events less than or equal to 1 hour 1 DATE _._ TIME ,, VOLUME DESCRIPTION OF INCIDENT & CAUSE - ACTION TAKEN TO ELIMINATE CAUSE 11/6/2006 1013 - 1045 222 Not required for unplanned events <= 1 hr Not required for unplanned events which TOTAL 222 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC -3 GAS FLARING INCIDENT REPORT November 2006 (Unplanned Events greater than 1 hour DATE N ,.,... -,.,,, 11ME DATE TOTAL TOTAL TOTAL Unplanned Events c 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events > 1 hour or exceeding 5,000 MCF Pict Purge Assist TOTAL FLARED VOLUME VOLUME DESCRIPTION OF INCIDENT & CAUSE- ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments 0 (Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE„,,,,,,„,„,,,,,„„, ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments 0 !Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 1 TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE, „.,., _ , ;._ ACTION TAKEN TO EUMINATE CAUSE _ y See Attachments See Attachments 0 TOTAL 222 0 0 0 all 15,242 Pegs t 12/10/2006 4:53 PM rtY 1. Facility Number 0290000033 12. Facility Name M PBU GC 3 3. Fleur PBU - WOA 14. Operator OW BP 15. MontlWaar Disposition December - 2006 Disposition Volume MCF 20. For production from multiple pods, list contribution of each pod as a percent of Total Volume 8. SOW 0 Pool Name Pool Code Percent 7 Reinjected 0 PRUDHOE 640150 100.00% 8. Flared or vented 1 hour or less 1,753 9. Flared or vented more than 1 how (see Instr.) 2,361 t/ 7 10. Pad and Purge 18,945 11. Used for lease operations (specify in Remarks) 518,804 12. Other (sea klatrucaona) 0 Authorlsaton >1 hr Safety 2 3�l MCF 13. TOTAL VOLUME (ITEMS 8.12) 541 863 Lease Use MCF 14. NGL Gas Equivalent 0 Conservation MCF 15. Purwsed gas 0 Waste: MCF 18. Transferred from: 0 ,2 -5' -o7 61 4 79 saioneCorog Data nalenea m: (Express as a negative s) CGF 17. Tra pr - 27,349,773 18. Remarks Block 11: Fuel Gas = 518,804 mscf and Assist Gas = 0 mscf !hereby certify that the fore irq Signature le true and rted the best of my knowledge. Tree Manager, Production Taxes and Royalty Note: All volumes must be corrected to pressure of 14.85 pale and to a temperature of 600 F. Authority 20 AAC25.235. /o Prim Pions Printed Name Bernard W. Haley (907)564-5028 Date � O �1 Form 10-422 Rev. 1 /2004 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Submit in Duplicate Ba- 1 'Unplanned Events less than or equal to 1 hour , DATE TIME VOLUME _ DESCRIPTION OF INCIDENT & CAUSE ,_ ACTION TAKEN TO ELIMINATE CAUSE 12/17/2006 0411 -0430 132 Not required for unplanned events c= 1 hr Not required for unplanned events which 12/22/2006 0857 -0928 1,184 12/23/2006 0250 -0305 229 12/27/2006 2214 2226 208 Unplanned Events c 1 Hour Unplanned Events> 1 Hour TOTAL TOTAL TOTAL. TOTAL 1,753 (Unplanned Events greater than 1 hour 1 DATE .�, TIME ,,, ,, „, VOLUME, DESCRIPTION OF INCIDENT & CAUSE,,.,, — ACTION TAKEN TO EUMINATE CAUSE, 12 0853 -1043 23 See Attachments See Attachments 12/27/2006 0215 -0721 2,338 2,361 1 'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mar L nr DATE �, ste „, _ TIME, ,,, VOLUME,„., DESCRIPTION OF INCIDENT & CAUSE_ ACTION TAKEN TO ELIMINATE CAUSE See Attachments 0 0 TOTAL 1,753 2,361 Planned Events c 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge MIL 18$46 Assist 0 , , TOTAL FLARED VOLUME 23 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-3 GAS FLARING INCIDENT REPORT December 2006 See Attachments See Attachments 1 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mot' ,�. DATE. _ TIME.,..„-,,,,. _ VOLUME,. DESCRIPTION OF INCIDENT & CAUSE. „.. ,. ACTION TAKEN TO EUMINATE CAUSE See Attachments Page 1 1/12/2007 10:29 AM Flare Start Date 12/1/2006 Flare End Date 12/312006 GC3 Flare Report Time Of Flaring Report Number Date Start Time Stop Time Duration Intermittent / Black Smoke / Planned Reported By Volume (MSCF) 06-203 Flare Relief 12/8/2006 8:53:00 AM 10:43:00 AM 110 minutes No No No BP1 WAYNESBS Determination Cause added assist pas to prevent flare pilots from blowing out due to high winds. Action Taken tlaeased pit gas and shut oR assist gas. 06-223 Flare Relief 12/27/2006 2:15:00 AM 7:21:00 AM 306 minutes Yes Determination Cause GC-3 S/D due to a bad PLC card in the LPS section, Well pads were S/D and flaring alt slugcatcheis continued intermittently. Action Taken Equipment was restarted at 0730 hours. Card was replaced. No No BPIVUALLERGW 23 2338 GPB Gas Flaring Incident Subject: GPB Gas Flaring Incident From: "GPB, Optimization Engr" <GPBOptimizationEngr @BP.com> Date: Wed, 27 Dec 2006 09:33:12 -0900 To: sieve mcmains@admin.state.ak.us, "GPB, Environ TL" <GPBEnvironTL@BP.coni>> "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com >, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com >, "Benson, Gary A" <Gary.Benson@BP.com >, "GPB, GC3 Area Mgr" <GPBGC3TL@BP.com >, "Kurz, John" <john.kurz@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com >, "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> CC: "GPB, Wells Opt Eng" <GPBWeltsOptEnga®13 ?.com5. To: Steve McMains. AOGCC steve_mcmains@admin.state.ak.us 907 - 793 -1241, fax 907 - 276 -7542 From: Beverly Luedke -Chan Field Optimization Engineer 907 - 659 -4382 (Filling in for GPB Production Optimization Team Leader) An extended gas flaring event occurred at GC3 plant on December 27. The GC3 Plant shutdown due to a bad PLC card in the LPS section. Well pads were S/D and flaring off slugcatchers continued intermittently from 02:15 until 07:21. PLC card was replaced. Equipment was restarted at 07:30 hours. The total flared volume was 2.34 MMSCF. If you require additional information, please don't hesitate to call. Beverly Luedke -Chan (Dwight Warner, alternate) Field Optimization Engineer (907) 659-4382 (907) 659 -4236 pgr 553 1 of 1 12/27/2006 10:13 AM