FACILITY: PBU Lisburne Prod
(GrPtMcArea)
OPERATOR: BP EXPLORATION
1 Facility Number
M
0290000009
2. Fadl Name
M
PBU LISBURNE PROD (GPMA)
3. Field
PBU -GPMA
4. Operator 5. Mar1ltWBard ptposttlort
BP 'January-2006
Disposition
Volume MCF
20. For production from multiple pods, list contribution of espl pool as a percent of
Total Volume.
6. 5010
145,090
Pool Name
Pool Cods
Percent
7 Reintected
12300 750
Lisburne
640144
42.3%
Niakuk & West Niakuk
640148
1.2%
8. Flared or vented 1 hour or less
0
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
9. Flared or vented mare than 1 lour (see knit)
0
Raven - Ivishak-Sag River
640147
1.8%
West Beach
640186
0.0%
10. Pea and Purge
12,089
11. Used for lease operations (specify in Remarks)
1,105,843
AlMOlmlion >t nr:
Safely
MCF
12. Other (see nsma.l4,.4)
1,781,746
13. TOTAL VOLUME (ITEMS 8-12)
15,345,518
Lease Use
MGM
14 NGL Gas Equivalent
145,090
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
16. Transferred from:
2,986,885
Commissioner 4b
17. Transferred to: (
(Express as a negative 0) CGF
0
18. Remarks Block 1 L Fuel Gas = 932,261 nscf and Assist Gas= 173,582 inset Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
I hereby certify that the foregoing i5 true and correct to the best of my knowledge.
Signature L
Manager, State Production Taxes
Take and Royalty
Note: es must be
corrected to o pressure of f 14.65 psis
and to a temperature of 60o F.
Authority 20 AAC25.235.
Printed Name Bernard W . ajny Phone ( 5028 Date — ' ./'0 4
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 5,478
Continuous Assist 73,711
TOTAL FLARED 84,189
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDNOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-08
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flom c= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 8,248
Continuous Assist 89,871
TOTAL FLARED 95,917
ae
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-05
1
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-06
i
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare 3 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
EP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-06
VOLUME PLANNED
DATE TIME (Mad) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 64
Continuous Assist 915
TOTAL FLARED 979
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-06
VOLUME PLANNED
DATE TIME (Msef) DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare r_ 1 Hour 0
Total flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 95
Continuous Assist 1,379
TOTAL FLARED 1,474
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-06
1
VOLUME PLANNED
DATE TIME (Msct) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pllot 206
Continuous Assist 2,906
TOTAL FLARED 3,112
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-06
Facility Number
0290000009
2. Fadkly Name
12.
PBU LISBURNE PROD (GPMA)
3. Field
IBP
4. Operator
5. Month/Year al Disposition
February
Pell - GPMA
Disposition
Volume MCF
20. For production from multiple pools, list cannbulbn or each pod as a percent of
Total Volume
6. Sold
119,400
Pod Name
Pod Code
Percent
7. Reinjected
10,937,891
Lisburne
640144
42.3%
Niakuk 8 West Niakuk
640148
1.2%
a. Flared or vented 1 roar cc less
1,052
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
9. Flared or vented more than 1 nor (see infer)
0
Raven - Ivishak - Sag River
640147
1.6%
West Beach
640186
0.0%
10. Pad and Purge
10,877
11. Used for base operations (specify in Remarks)
1,017,055
Authorization >1 hr.
Safety
MCF
12. Other (see Instructions)
1,472,187
13. TOTAL VOLUME (ITEMS S-12)
13,558,462
Lease Use
MCF
14. NGL Gas Equivalent
119,400
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
16. Transferred from:
2,180,628
Commissioner Date
17. Transferred 10: (Express as a negative 0) CGF
0
It Remarks: Block II: Fuel Gas = 867,600 mscf and Assist Gas = 149,455 rnscf; Block 12: L.if Gas Off Field; Block 16: MI Gas from Pfudtoe
I hereby candy that the (oregano is true and correct to the best of my knowledge.
Manager, State Production Taxes
Signature Title and Royally
Note: All volumes must be
corrected to pressure of 14.65 pals
and a temperature of 60o F.
Authority 20 A C:25.235.
Printed Name Bernard
ajny Prone (907)564 -5026 Dare
3 /1 � / /'
( O
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-06
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE
2/5/2006 1510 -1514
2/5/2008 1520 -1521
2/5/2006 1543
2/5/2006 1642 -1643
2/5/2006 1720-1722
2/6/2006 1007 -1011
2/6/2008 1014 - 1015
2/6/2006 1022 -1023
2/6/2006 1038 -1052
2/6/2006 1101 -1104
2/15/2006 1113 -1114
2/15/2006 1432 -1440
2/17/2006 1055 -1057
2/17/2006 1059 -1100
2/17/2006 1106 -1107
2/17/2006 1117 -1118
2/17/2006 1135 -1200
2/17/2006 1349-1350
2/17/2006 1400 -1401
2/17/2006 1403-1410
2/17/2006 1414-1416
Total Flare c= 1 Hour
Toter Flare r 1 Hour O
Volume Flared 0
Measured Safety Pilot 4,819
Continuous Assist 63,717
TOTAL FLARED 68,336
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor completed
1830 MI Compressor normal shutdown
NGL plant shutdown due to FCO testing of generators. 1855 shutdo%
Attempted start on 1830 MI Compressor. Automatic Purging.
Attempted start on 1830 MI Compressor. Automatic Purging.
Attempted start on 1830 MI Compressor. Automatic Purging.
Attempted start on 1830 MI Compressor. Automatic Purging.
NGL DC3 tower to flare due to HP flare onset by 1830 compressor
Attempted start on 1830 MI Compressor. Automatic Purging.
Attempted start On 1830 MI Compressor. Automatic Purging.
Attempted start on 1830 MI Compressor. Automatic Purging.
Attempted start on 1830 MI Compressor. Automatic Purging.
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
MI comp depressure to flare and comp in Standby
Flare valve dosed
Flare valve posed
Flare valve closed
Flare valve closed
Flare valve closed
1830 MI Compressor completed shutdown
NGL Tower depressured and quit flaring
Purge complete
Purge complete
Purge complete
Purge complete
1830 MI compressor shutdown and depressured.
Purge complete
Purge complete
Purge complete
Purge complete. Start complete.
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
2/5 /2006 1510 -1514
2/5/2008 1520 -1521
2/5/2006 1543 -1544
2/5/2006 1642 -1643
2/5/2006 1720 -1722
2)6/2006 1007 -1011
2/6/2008 1014 - 1015
2/6/2006 1022-1023
2/612006 1038 -1052
2/6/2006 1101 -1104
2/15/2006 1113 -1114
2/15/2006 1432 -1440
2/17/2006 1055 -1057
2/17/2006 1059 -1100
2/17/2006 1106 -1107
2/17/2006 1117-1118
2/17/2006 1135 -1200
2/17/2006 1349 -1350
2/17/2006 1400 -1401
2/17/2006 1403 -1410
2/17/2006 1414-1416
Total Flare a 1 Hour 1, 052
Total Flare a 1 Hour 0
Volume Flared 1,052
Measured Safety Pilot 5,892
Continuous Assist 80,704
TOTAL FLARED 87,848
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-06
78 Attempted start on 1830 MI Compressor
1 Attempted start on 1830 MI Compressor
23 Attempted start on 1830 MI Compressor
11 Attempted start on 1830 MI Compressor
12 Attempted start on 1830 MI Compressor
77 Start on 1830 MI Compressor
10 Start on 1830 MI Compressor
2 Start on 1830 MI Compressor
68 Start on 1830 MI Compressor
83 Start on 1830 M1 Compressor completed
21 1830 MI Compressor normal shutdown
150 NGL plant shutdown due to FCC) testing of generators
58 Attempted start on 1830 MI Compressor. Automatic P
10 Attempted start on 1830 MI Compressor. Automatic P
9 Attempted start on 1830 MI Compressor. Automatic P
1 Attempted start on 1830 MI Compressor. Automatic P
359 NGL DC3 tower to flare due to HP flare onset by 1830
1 Attempted start on 1830 MI Compressor. Automatic P
1 Attempted start on 1830 MI Compressor. Automatic P
34 Attempted start on 1830 MI Compressor. Automatic P
43 Attempted start on 1830 MI Compressor. Automatic P
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
. 1855 shutdos Unplanned
urging. Unplanned
urging. Unplanned
urging. Unplanned
urging. Unplanned
compressor Unplanned
urging. Unplanned
urging. Unplanned
urging. Unplanned
urging. Unplanned
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Flare valve closed
Flare valve dosed
Flare valve closed
Flare valve dosed
MI comp depressure t0 flare and comp in Standby
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
1830 MI Compressor completed shutdown
NGL Tower depressured and quit flaring
Purge complete
Purge complete
Purge complete
Purge complete
1830 MI compressor shutdown and depressured.
Purge complete
Purge complete
Purge complete
Purge complete. Start complete.
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE DAV, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-06
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
2/5/2006 1510 -1514
2/5/2008 1520 -1521
2/5/2006 1543 -1544
2/5/2006 1642 -1643
2/5/2006 1720 -1722
2/6/2006 1007 -1011
2/6/2006 1014 -1015
2/6/2006 1022 -1023
2/6/2006 1038 -1052
2/6/2006 1101 -1104
2/15/2006 1113 -1114
2/15/2006 1432 -1440
2/17/2006 1055 -1057
2/17/2006 1059 -1100
2/17/2006 1106-1107
2/17/2006 1117 -1118
2/17/2006 1135 -1200
2/17/2006 1349 -1350
2/17/2006 1400 -1401
2/17/2006 1403 -1410
2/17/2006 1414 -1416
Total Flare c= 1 Hour
Total Rare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
_■
Attempted start of 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor completed
1830 MI Compressor normal shutdown Unplanned
NGL plant shutdown due to FCC, testing of generators. 1855 shutdov Unplanned
Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
NGL DC3 tower to flare due to HP flare onset by 1830 compressor Unplanned
Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
.Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
MI comp depressure to flare and comp in Standby
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
1830 MI Compressor completed shutdown
NGL Tower depressured and quit flaring
Purge complete
Purge complete
Purge complete
Purge complete
1830 MI compressor shutdown and depreseured.
Purge complete
Purge complete
Purge complete
Purge complete. Start complete.
2/5/2006 1510 -1514
2/5/2008 1520-1521
2/5/2006 1543 -1544
2/5/2006 1642 - 1643
2/5/2006 1720 -1722
2/6/2006 1007 -1011
2/6/2006 1014 -1015
2/6/2006 1022
2/6/2006 1038 -1052
2/6/2006 1101 -1104
2/15/2006 1113 - 1114
2/15/2006 1432 -1440
2/17/2006 1055-1057
2/17/2006 1059 -1100
2/17/2006 1108 -1107
2/17/2006 1117-1118
2/17/2006 1135 -1200
2/17/2006 1349 -1350
2/17/2006 1400 -1401
2/17/2006 1403 -1410
2/17/2006 1414 - 1416
Total Flare c: 1 Hour 0
Total flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-06
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
O Attempted start on 1830 MI Compressor
O Attempted start on 1830 MI Compressor
O Attempted start on 1830 MI Compressor
0 Attempted start on 1830 MI Compressor
O Attempted start on 1830 MI Compressor
0 Start on 1830 MI Compressor
0 Start on 1830 MI Compressor
0 Start On 1830 MI Compressor
O Start on 1830 MI Compressor
O Start on 1830 MI Compressor completed
0 1830 MI Compressor normal shutdown
O NGL plant shutdown due to FCO testing of generators.
0 Attempted start on 1830 MI Compressor. Automatic Pu
O Attempted start on 1830 MI Compressor. Automatic Pu
O Attempted start on 1830 MI Compressor. Automatic Pu
O Attempted start on 1830 MI Compressor. Automatic Pu
O NGL DC3 tower to flare due to HP flare onset by 1830
O Attempted start on 1830 MI Compressor. Automatic Pu
O Attempted start on 1830 MI Compressor. Automatic Pu
O Attempted start on 1830 MI Compressor. Automatic Pu
0 Attempted start on 1830 MI Compressor. Automatic Pu
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
1855 shutdow Unplanned
rging. Unplanned
rging. Unplanned
rging. Unplanned
rging. Unplanned
compressor Unplanned
rging. Unplanned
rging. Unplanned
rging. Unplanned
rging. Unplanned
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
MI comp depressure to flare and camp in Standby
Flare valve closed
Flare valve closed
Flare valve closed
Flare vale closed
Flare valve closed
1830 MI Compressor completed shutdown
NGL Tower depressured and quit flaring
Purge complete
Purge complete
Purge complete
Purge complete
1830 MI compressor shutdown and depressured.
Purge complete
Purge complete
Purge complete
Purge complete. Start complete.
DATE TIME
2/5/2006 1510 -1514
2/5/2008 1520 -1521
2/5/2008 1543 -1544
2/5/2006 1642 -1643
2/5/2006 1720 -1722
2/6/2006 1007 -1011
2/6/2006 1014 -1015
2/6/2006 1022 -1023
2/6/2008 1038 -1052
2/6/2006 1101 -1104
2/15/2008 1113 - 1114
2/15/2006 1432 -1440
2/17/2008 1055 -1057
2/17/2006 1059 -1100
2/17/2006 1106 -1107
2/17/2006 1117 -1118
2/17/2006 1135 -1200
2/17/2008 1349 -1350
2/17/2006 1400 -1401
2/17/2006 1403 -1410
2/17/2006 1414 -1416
Total Flare r_ 1 Hour
Total Flare , 1 Hour 0
Volume Flared 0
Measured Safety Pilot 93
Continuous Assist 1,274
TOTAL FLARED 1,367
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-06
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor completed
1830 MI Compressor normal shutdown
NGL plant shutdown due to FCC, testing of generators. 1855 shutdot+
Attempted start on 1830 MI Compressor. Automatic Purging.
Attempted start on 1830 MI Compressor, Automatic Purging.
Attempted start on 1830 MI Compressor, Automatic Purging.
Attempted start on 1830 MI Compressor, Automatic Purging.
NGL DC3 tower to flare due to HP flare onset by 1830 compressor
Attempted start on 1830 MI Compressor. Automatic Purging.
Attempted start on 1830 MI Compressor. Automatic Purging.
Attempted start on 1830 MI Compressor. Automatic Purging.
Attempted start on 1830 MI Compressor. Automatic Purging.
PLANNED
UNPLANNED
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
MI comp depressure to flare and comp in Standby
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
1830 MI Compressor completed shutdown
NGL Tower depressured and quit flaring
Purge complete
Purge complete
Purge complete
Purge complete
1830 MI compressor shutdown and depmssured.
Purge complete
Purge complete
Purge complete
Purge complete. Start complete.
DATE TIME
2/5/2006 1510 -1514
2/5/2008 1520 -1521
2/5/2006 1543 -1544
2/5/2006 1642 -1643
2/5/2006 1720 -1722
2/6/2006 1007 -1011
2/6/2006 1014 -1015
2/6/2006 1022 -1023
2/6/2006 1038
2/6/2006 1101 -1104
2/15/2006 1113 -1114
2/15/2006 1432 -1440
2/17/2006 1055 -1057
2/17/2006 1059 -1100
2)17/2006 1106
2/17/2006 1117 -1118
2/17/2006 1135 -1200
2/17/2006 1349 -1350
2/17/2006 1400-1401
2/17/2006 1403 -1410
2/17/2006 1414 - 1416
Total Flare a 1 Hour
Total Flare a 1 Hour 0
Volume Flared 0
Measured Safety Pilot 85
Continuous Assist 1,203
TOTAL FLARED 1,291
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-06
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Attempted start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor
Start on 1830 MI Compressor completed
1830 MI Compressor normal shutdown
NGL plant shutdown due to FCC testing of generators
Attempted start on 1830 MI Compressor. Automatic P
Attempted start on 1830 MI Compressor. Automatic P
Attempted start on 1830 MI Compressor. Automatic P
Attempted start on 1830 MI Compressor. Automatic P
NGL DC3 tower to flare due to HP flare onset by 1830
Attempted start on 1830 MI Compressor. Automatic P
Attempted start on 1830 MI Compressor. Automatic P
Attempted start on 1830 MI Compressor. Automatic P
Attempted start on 1830 MI Compressor. Automatic Pu
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
. 1855 shutdow Unplanned
urging. Unplanned
urging. Unplanned
urging. Unplanned
urging. Unplanned
compressor Unplanned
urging. Unplanned
urging. Unplanned
urging. Unplanned
rging. Unplanned
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Flare valve closed
Flare valve closed
Flare valve dosed
Flare valve Closed
MI comp depressure to flare and comp in Standby
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
1830 MI Compressor completed shutdown
NGL Tower depressured and quit flaring
Purge complete
Purge complete
Purge complete
Purge complete
1830 MI compressor shutdown and depressured.
Purge complete
Purge complete
Purge complete
Purge complete. Start complete.
DATE TIME
2/5/2006 1510 -1514
2/5/2008 1520-1521
2/5/2006 1543 - 1544
2/5/2006 1642 -1643
2/5/2006 1720-1722
2/6/2006 1007 -1011
2/6/2006 1014 -1015
2/6/2006 1022-1023
2/6/2006 1038 -1052
2/6/2006 1101 - 1104
2/15/2006 1113 -1114
2/15/2006 1432 -1440
2/17/2006 1055 -1057
2/17/2006 1059.1100
2/17/2006 1106 -1107
2/17/2006 1117-1118
2/17/2006 1135 -1200
2/17/2006 1349 -1350
2/17/2006 1400 -1401
2/17/2006 1403 -1410
2/17/2006 1414 -1416
Total Flare c= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 185
Continuous Assist 2,557
TOTAL FLARED 2,742
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-06
VOLUME
(Mscf) DESCRIPTION OF INCIDENTS & CAUSE
O Attempted start on 1830 MI Compressor
O Attempted start on 1830 MI Compressor
0 Attempted start on 1830 MI Compressor
O Attempted start on 1830 MI Compressor
O Attempted start on 1830 MI Compressor
O Start on 1830 MI Compressor
O Start on 1830 MI Compressor
O Start on 1830 MI Compressor
O Start on 1830 MI Compressor
O Start on 1830 MI Compressor completed
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
O 1830 MI Compressor normal shutdown Unplanned
O NGL plant shutdown due to FCO testing of generators. 1855 shutdow Unplanned
O Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
O Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
O Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
O Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
0 NGL DC3 tower to flare due to HP flare onset by 1630 compressor Unplanned
O Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
O Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
O Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
O Attempted start on 1830 MI Compressor. Automatic Purging. Unplanned
Flare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
MI comp depressure to flare and comp in Standby
Flare valve closed
Rare valve closed
Flare valve closed
Flare valve closed
Flare valve closed
1830 MI Compressor completed shutdown
NGL Tower depressured and quit flaring
Purge complete
Purge complete
Purge complete
Purge complete
1830 MI compressor shutdown and depressured.
Purge complete
Purge complete
Purge complete
Purge complete. Start complete.
1. Facility Number
M
0290000009
Facility
2. F Name
PBU LISBURNE PROD (GPMA)
3. Fial
t for
O pera
BP
5. Mon Disposition
March -2008
PBU - GPMA
PBU
Disposition
Volume MCF
20. For production from multiple poor.. Ilst convibubon of each pod as a percent of
Total Volume.
8. Sold
123,159
Pool Name
Pool Code
Percent
7 Reinjected
12,271,460
Lisburne
640144
42.3%
Niakuk & West Niakuk
840148
1.2%
6. Flared a vented 1 Inv or tees
0
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
840180
54.9%
9. Flared or vented more than 1 Iva (see Instr.)
0
Raven • Ivishak -Sap River
840147
1.6%
West Beach
640186
0.0%
10. Pad and Purge
12,074
11. Used for lease operations (specify In Remarks)
1,044,287
12. Other (see nsbucaons)
1,190,661
Autltorineon >1 hr
Safety
MCF
13. TOTAL VOLUME (ITEMS 612)
14,641,641
Lease Use
MCF
1l. NGL Gas Equivalent
123,159
Conservation
MCF
15. Purchased pas
0
Waste.
MCF
16. Transferred from:
2,173,664
Commissioner Date
17. Trinstemed 10: (Express as a negative e) CGF
0
19. Remarks. Block 11: Fuel Gas = 935,134 mscf and Assist Gas = 109,153 mscf; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
I hereby certify that the crewing is true ac nee beat of my knowledge.
Manager, State Production Taxes
signature The and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psle
and
Authority In AS125.235. F.
Primed Name Bernard W. Hajny Phone (907)564 -502e Dam e lif -O6
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Total Flare <: 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 5,227
Continuous Assist 47,379
TOTAL FLARED 52,606
BP EXPLORATION ALASKA. INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS a CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare cs 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 6,480
Continuous Assist 58,493
TOTAL FLARED 64,973
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c. 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-06
VOLUME PLANNED
DATE THE (Meat) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTON TAKEN TO ELIMINATE CAUSE
Total Rare a 1 Hour 0
Total Flare, 1 Hour 0
Volume Flared 0
Measured Safety Pilot 97
Continuous Assist 864
TOTAL FLARED 981
BP EXPLORATION ALASKA, INC.
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-06
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pllot 79
Continuous Assist 710
TOTAL FLARED 789
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-06
VOLUME PLANNED
DATE TIME (Meet) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Rare rl 1 Hour 0
Total flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 191
Continuous Assist 1,707
TOTAL FLARED 1,898
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-06
1 Facility Number
0290000009
2. Facility Name
PBU LISBURNE PROD (GPMA)
3 Feld
PBU - GPMA
6. Operator
BP
5. MonfV1'ear Of Disposition
April -2006
Disposition
Volume MCF
20. For production from multiple pools, list contnbution of each pod as a percent of
Total volume.
6. Soa
107 335
Pool Name
Pod Code
Percent
7 . Reinjected
9,718,046
Lisburne
640144
42.3 ° .'a
Niakuk & West Niakuk
640148
1.2%
8 Fleredavented t hour or rasa
711
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640160
54.9%
9 Flared a vented more man 1 hour (see Viso)
D
Raven • Ivishak -Sag River
640147
1.6%
West Beach
640186
0.0%
10. Pilot and Purge
11,728
11. Used for lease operations (specify In Remarks)
1,379,824
12. Other (ass instructions)
1,075,437
' �' - = `...• . . .1501 Ceh.
.l;_mt1" co- ` al
Authonration >1 hr.
Safe fy
MCF
13. TOTAL VOLUME (ITEMS 612)
12,293,081
Lease Use
MCF
14. NG. Gas Equivalent
107.335
Conservation
MCF
15. Purchased gas
0
Waste.
MCF
18. Transferred from:
2,699,151
Commissioner Date
17. Transferred to: (Express as a negative a) CGF
0
18. Remarks: Block 11: Fuel Gas = 1,260.777 mscf and Assist Gas = 1 19.047 mutt; Block 12: Lift Gas Off Field; Block 16: MI Gas from Prudhoe
!hereby certify that the for ... • is true and c. : • e best of my knowledge.
Signature
Manager, State Production Taxes
_ _ � ith..., Title and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F.
Authority 20 AAC25.235.
[�
Printed Name Bernard W. Hajny Phone (9071564-5028 Date 7 �� Q�j7
Form 10 -422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
DATE
4/1/2006
4/16/2006
4/17/2006
Total Flare > 1 Hour 0
Volume Flared 356
Measured Safety Pilot 5,759
Continuous Assist 58,351
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1342 -1345 17
1015 -1026 103
1312- 1332 236
Total Flare a 1 Hour 356
TOTAL FLARED 64,466
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-68
Digital Valves Gas Leak
Depressants 24' line from west side for maintenance on the pipeline
Completed depressuring the 24' common line on the west side
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Planned
Planned
Manual shutdown of MI Comproseor
line Depressured
tine Depressured
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
4/1/2006 1342-1345
4/16/2006 1015 -1026
4/17/2006 1312-1332
Total Flare a 1 Hour 329
Total Flare> 1 Hour 0
Volume Flared
Measured Safety Pilot 5,216
Continuous Assist 52.987
TOTAL FLARED
329
58,532
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-06
20 Digital Valves Gas Leak
87 Depressure 24' line from west side for maintenance on the pipeline
222 Completed depressuring the 24' common line on the west side
PLANNED
UNPLANNED
Unplanned
Planned
Planned
ACTION TAKEN TO ELIMINATE CAUSE
Manual shutdown of MI Compressor
Line Depressured
Line Depressured
DATE
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -06
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
4/1/2006 1342 -1345 0 Digital Valves Gas Leak
4/16/2006 1015 -1026 0 Depressure 24' Nne from west side for maintenance on the pipeline
4/17/2006 1312-1332 0 Completed depressunng the 24' common line on the west side
PLANNED
UNPLANNED
Unplanned
Planned
Planned
ACTION TAKEN TO ELIMINATE CAUSE
Manual shutdown of MI Compressor
Line Depressured
Line Depressured
DATE
4/1/2006 1342 -1345 0 Digital Valves Gas Leak
4 /16/2006 1015 -1026 0 Depressure 24' line frorn west side for maintenance on the pipeline
4/17/2006 1312 -1332 0 Completed depressuring the 24• common line on the west side
Total Flare a 1 Hour 0
Total Flan >1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -0a
PLANNED
UNPLANNED
Unplanned
Planned
Planned
ACTION TAKEN TO ELIMINATE CAUSE
Manual shutdown of MI Compressor
Line Depressured
Line Depressured
DATE
4/1/2006
4/16/2006
4/17/2006
1342 -1345 1
1015 -1026 4
1312 -1332 13
Total Flare a 1 Hour 18
Total Flare> 1 Hour 0
Volume Flared 18
Measured Safety Pilot 288
Continuous Assist 2,950
TOTAL FLARED 3,258
s_ ®®
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-06
VOLUME
TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
Digital Valves Gas Leak
Depressure 24' line from west side for maintenance on the pipeline
Completed depressunng the 24' common line on the west side
PLANNED
UNPLANNED
Unplanned
Planned
Planned
ACTION TAKEN TO ELIMINATE CAUSE
Manual shutdown of MI Compressor
Line Depressured
Line Depressured
Total Flare a 1 Hour 8
Total Flare > 1 Hour 0
Volume Flared 8
Measured Safety Pilot 127
Continuous Assist 1,296
TOTAL FLARED 1,431
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -06
VOLUME PLANNED
DATE TIME (MUt) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/1/2006 1342-1345 0 Digital Valves Gas Leak Unplanned Manual shutdown of MI Compressor
4/16/2006 1015-1026 2 Depressure 24' line from west side for maintenance on the pipeline Planned Line Depressured
4/17/2008 1312 -1332 6 Completed depressuMg the 24' common line on the west side Planned Line Depressured
DATE
Ton/ Flans a 1 Hour 18
Total Flare > 1 Hour 0
Volume Flared 18
Measured Safety Pilot 338
Continuous Assist 3,463
TOTAL FLARED 3,819
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr -06
VOLUME
TIME {Nett) DESCRIPTION OF INCIDENTS & CAUSE
4/1/2006 1342 -1345 1 Digital Valves Gas Leak
4/16/2008 1015 -1026 5 Depressure 24' line from west side for maintenance on the pipeline
4/17/2006 1312 -1332 12 Completed depressuring the 24' common One on the west side
PLANNED
UNPLANNED
Unplanned
Planned
Planned
ACTION TAKEN TO ELIMINATE CAUSE
Manual shutdown of MI Compressor
Line Depressured
Line Depressured
FACILITY: LPC DATE: 16 Apr 2006
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Controlled Blowdow 10:15 10:26 0 Hrs 11 Mins ❑ ❑ ® 201 MSCF
TOTAL VOLUME 201 MSCF
First Determination of Cause:
1. Depressure 24' Common Line from West Side for Maintenance on the Pipeline.
Action Taken to Stop Flaring:
1. Line Depressured.
BPXA FLARE REPORT
PRUDHOE BAY
REPORT NO: 06 -0213
Tuesday, April 25, 2006
Page 1 of 1
Action Taken to Stop Flaring:
1. Depressured
Tuesday, April 25, 2006
REPORT NO: 06 -0219
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: LPC DATE: 17 Apr 2006
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Controlled Clowdow 13:12 13:32 O Hrs 20Mins O El W 489 MSCF
TOTAL VOLUME 489 MSCF
First Determination of Cause:
1. Completed depressuring 24" Common Line on the West Side.
Page 1 of 1
0290000009 12. Facilty Number
2. Facility Name
PBU LISBURNE PROD (GPMA)
3. Field Field
PBU - GPMA
A. Operator
I BP
5. Month/Yew d ObpoaNim
May - 2006
Disposition
Volume MCF
20. For production from multiple pods, fist contribution d each pod as a percent of
Tow Volume
6. Sold
87,700
Pool Name
Pool C
Percent
7. Reinjected
7171 028
Lisburne
640144
42.3%
Niakuk 8 West Niakuk
640148
1.2%
8. Flared «veined 1 Ihohu «less
634
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
9. Flared or vented more than 1 hour (see inst.)
0
Raven • IViShak -Sag River
640147
1.6%
West Beach
640186
0.0%
10. Piot and Purge
12,571
11. Used fa lease operations (specify In Remarks)
456,737
12. Other (see instructions)
1,327,355
Authorization >1 hr
Safety
MCF
13. TOTAL VOLUME (ITEMS 6-12)
9,056,025
Lease Use
MCF
14. NGL Gas Equivalent
87,700
Consenatlon
MCF
t5. Purchased gas
O
Waste
MCF
16. Translated from:
2 841 803
Camnsssionsr Date
17. Transferred to: (Express as a negative a) CGF
0
16. Remarks. Block l It Fuel Gas = 311,800 nucf and Assist Gas = 144,937 mscf; Block 12: Lif Gas Off Field; Block 16: Mt Gas from Prudhoe
I hereby certify that the • egoing is oue and •• • • b , .. • of my ktbesedge.
Manager, State Production Taxes
Signature — -_f SI Tres and Royalty
Note: Alt volumes must be
corrected to pressure of 14.65 psla
and to a temperature of 60o F.
Authority 20 AAC25.235.
6)1 r
Printed Name Bemard W. Hajny Phone (907)564 -5028 Date 4' ( ? 06
Font 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
Total Flare a 1 Hour 579
Total Flare, 1 Hour 0
Volume Flared 579
Measured Safety Pilot 10,417
Continuous Assist 121,920
TOTAL FLARED 132,916
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO, 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/13/2006 0408 437 Depressure 14' common fine for maintenance & possible replacemer Planned Stopped depressudng line.
5/13/2006 0855-0857 33 Depressors 14' common fine for maintenance & possible replacemer Planned Stopped depreasuring line.
5/13/2006 1317 - 1321 109 Depressure 14' Common line for maintenance & possible replacemer Planned Stopped depressudng One.
5/13/2006
5/13/2006
5/13/2008
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0408-0435 0
0855-0857 0
1317 - 1321 0
Total Flare a 1 Hour 0
Total flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 1,144
Continuous Assist _ 11,217
TOTAL FLARED 12,361
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0.219
PRUDHOE SAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-08
Depressors 14' common line for maintenance & possible replacemer Planned
Depressors 14' common fine for maintenance & possible replacemer Planned
Depressors 14 common ens tor maintenance & possible replecemer Planned
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Stopped depressurinp line.
Stopped depressudnp Ilna.
Stopped depressudnp line.
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/13/2008 0408-0435 0 Depressure 14' common fine for maintenance & possible replacemer Planned Slopped depressuring line.
5/13/2008 0855-0857 0 Depressure 14• common fine for maintenance & possible replacemer Planned Stopped depreesudng line.
5/13f2008 1317 -1321 0 Depressure 14' common line for maintenance & possible replacemer Planned Stopped depreesuring line.
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/13/2006 0408 0 Depressure 14' common ine for maintenance & possible replaccemer Planned Stopped depressur ny 110.
5/13/2006 0855 0 Depressure 14' common line for maintenance & possible replacemer Planned Stopped deereawMo line.
5/13/2006 1317 -1321 0 Depressure 14' common line for maintenance & possible replaeemar Planned Stopped depressurhq nns.
Total Flara a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-06
DATE TIME
5/13/2006 0408 -0435
5/13/2006 fra55 -0857
5/13/2006 1317 -1321
Total Fare a 1 Hour 8
Total Flare > 1 Hour 0
Volume Flared e
Measured Safety Pilot 146
Continuous Assist 1,705
TOTAL FLARED 1,859
VOLUME
(Mac?) DESCRIPTION
8 Depressure 14'
0 Depressure 14'
2 Depresaure 14'
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER N0. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-06
OF INCIDENTS & CAUSE
common line for maintenance & possible
common line for maintenance & possible
tomman lino for maintenance & possible
replacemer Planned
replacemer Planned
replacemer Planned
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Stopped depressudng line.
Stopped depreseudnp One.
Stopped depressuring lee.
Total Flare a 1 Hour 11
Total Flare > 1 Hour 0
Volume Flared 11
Measured Safety Pilot 199
Continuous Assist 2,322
TOTAL FLARED 2,532
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-06
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/132006 0408-0435 7 Depressure 14' common One for maintenance & possible replacemer Planned Stopped depressunnp line.
5/13/2006 0855-0857 1 Depressure 14' common One for maintenance & possible replacemer Planned Stopped depreseurinp line.
5/132006 1317 - 1321 3 Depressors 14' common Ilse for maintenance & possible replacemer Planned Stopped depressuu&p One.
Total Flare a 1 Hour 36
Total Flare > 1 Hour 0
Volume Flared 36
Measured Safety Pilot 885
Continuous Assist 7,773
TOTAL FLARED 6,474
ameammum
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-06
VOLUME PLANNED
DATE TIME (Matt) DESCRIPTION OF INCIDENTS ✓k CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/13/2008 0408 -0435 28 Depressure 14' common Nne for maintenance & possible replacemer Planned Stopped depessudng Rne.
5/13/2006 0855 2 Depressure 14' Common Me tor maintenance & possible replacemer Planned Stopped depressudn0 Rne.
5/13/2008 1317 -1321 6 Depressure 14' common IMe for maintenance & possible replacemer Planned Stopped depreuudny Ihe.
FACILITY: LPC
Action Taken to Stop Flaring:
1. Stopped depressuring line.
2. Stopped depressuring line.
3. Stopped depressuring line.
REPORT NO: 06 -0246
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 13 May 2006
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Controlled Blowdow 04:08 04:35 OHrs 27Mins ❑ ❑ (✓] 478 MSCF
2. Controlled Blowdow 08:55 08:57 OHrs 2Mins ❑ ❑ ® 36 MSCF
3. Controlled Blowdow 13:17 13:21 0 Mrs 4Mins ❑ ❑ fif 120 MSCF
TOTAL VOLUME 634 MSCF
First Determination of Cause:
1. Depressuring Westside 14" common line for maintenance and possible replacement.
2. Depressuring Westside 14" common line for maintenance and possible replacement continued.
3. Depressuring Westside 14" common line for maintenance and possible replacement continued.
Wednesday, May 31, 2006 Page 1 of 1
Faeilify Number
0290000009
2. Facility Name
12.
PBU LISBURNE PROD (GPMA)
3. Field
PBU - GPMA
a. Operator 5. MonthNear d Oispoalam
�BP June -2006
Disposition
Volume MCF
20. For production from multiple pools, at centrbubon 01060 pool as 1 percent at
Toter Volume.
6. Sdd
65,388
Pool Name
Pod Code
Percent
7. Reinjected
6,453,891
Lisburne
640144
42.3%
Niakuk & West Niakuk
640148
1.2%
6 Flared a vented 1 new or less
963
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
hour ro
9. Flared or vented more than 1 to (see es.)
0
Raven - Ivishak River
640147
1.6%
West Beach
640186
0.0%
10. Pilot are Purge
12,169
11. Used for lease operations (specify in Remarks)
893,039
12. Other (see instrudions)
982,867
Aulhoriration >1 hr
Safety
MCF
13. TOTAL VOLUME (TTEMS 6-12)
8,408,317
Lease Use
MCF
14. NGL Gas Equivalent
85,388
Cdnsentation
MCP
15. Purchased gas
0
Waste:
MCF
It Transferred horn:
3,409,687
Commissioner Date
17. Transferred to: (Eames as a negative 1) CGF
0
t8. Remarks: Block 11: Fuel Gas = 749,546 mscf and Assist Gas = 143,493 msct; Block 12: Uf Gas Off Field; Block 16: MI and Fuel Gas from Prudhoe
I hereby certify that the le to the beat d my knowiadge.
Manager, State Production Taxes
signature Tide and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 600 F.
Authority 20 AAC25.235.
r
Printed Name Bemard W. Rainy Ptwne (907)564 -5028 Date 7 747-1:94.
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
DATE TIME
6/21/2008 1613 -1618
6/21/2006 1648 -1650
6/21/2006 1718 -1719
6/21/2006 1727 -1807
6/21/2006 1806 -1808
6/21/2006 1811 -1820
6/21/2006 1822 -1904
6)21 /2006 1907 -1925
8/22/2006 1306 -1307
6/22/2006 1315 -1318
6/22/2006 1319 -1321
6/22/2006 1322 -1328
6/22/2006 1330 -1332
6/22/2006 1335 -1407
Total Flare a 1 Hour 872
Total Flare> 1 Hour 0
Volume Flared 872
Measured Safety Pilot 11,042
Continuous Assist 130,205
TOTAL FLARED 142,119
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAT, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-06
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS d CAUSE
228 1801 & 1807 compressors shutdown on high exhaust stack temp
7 1801 compressor shutdown on high exhaust stack temp
1 1801 compressor shutdown on high exhaust stack temp
171 1801 compressor shutdown on high exhaust stack temp
1 1801 compressor shutdown on high exhaust stack temp
24 1801 compressor shutdown on high exhaust stack temp
194 1801 compressor shutdown on high exhaust stack temp
78 1801 compressor shutdown on high exhaust stack temp
1 1800 STVAP compressor shutdown on high discharge temp
4 1800 STVAP compressor shutdown on high discharge temp
3 1800 SNAP compressor shutdown on high discharge temp
11 1800 STVAP compressor shutdown on high discharge temp
3 1800 STVAP compressor shutdown on high discharge temp
146 1800 STVAP compressor shutdown on high discharge temp
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Prepare t0 start 1801 6 1807 compressors
Prepare to start 1801 compressor - unable to start
Prepare re start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
Prepare to start 1800 Compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 Compressor
Compressor started
DATE TIME
6/21/2008 1613-1618
6/21/2006 1648 -1650
6/21/2006 1718 -1719
6/21/2006 1727 -1807
6/21/2006 1806 -1808
6/21/2006 1811 - 1820
6/21/2006 1822 -1904
6/21/2006 1907 -1925
6/22/2006 1306 - 1307
6/22/2006 1315 -1318
6/22/2006 1319 -1321
6/22/2006 1322 -1328
6/22/2006 1330 -1332
6/22/2006 1335 -1407
1
Total Flare a 1 Hour 1
Total Flare a 1 Hour 0
Volume Flared 1
Measured Safety Pilot 13
Continuous Assist 139
TOTAL FLARED 153
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-06
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1801 & 1807 compressors shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1800 STV/IP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 SNAP compressor shutdown on high discharge temp
1800 SNAP compressor shutdown on high discharge temp
1800 STV/IP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Prepare to start 1801 & 1807 compressors
Prepare t0 start 1801 compressor - unable to start
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to Stan 1800 cdmpraasor
Compressor started
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
DATE TIME
6/21/2006 1613 -1618
6/21/2006 1648 -1650
6/21/2006 1718 -1719
6/21/2008 1727 -1807
6/21/2006 1806 -1808
6/21/2006 1811 -1820
6/21/2006 1822 -1904
6/21/2006 1907 -1925
6/22/2008 1306 -1307
622/2006 1315 -1318
6/22/2006 1319 -1321
6/22/2008 1322 -1328
622/2008 1330 -1332
6/22/2006 1335 -1407
VO
( M
Total Flare c= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-06
UME
CF) DESCRIPTION OF INCIDENTS & CAUSE
1801 & 1807 compressors shutdown an high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1800 STVAP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 SNAP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 SNAP compressor shutdown on high discharge temp
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Prepare to start 1801 & 1807 compressors
Prepare to start 1801 compressor - unable 10 start
Prepare t0 start 1800 compressor
Prepare t0 start 1800 compressor
Prepare 10 start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare 10 start 1800 compressor
Prepare to start 1800 compressor
Prepare t0 start 1800 compressor
Compressor started
DATE TIME
6/21/2006 1613 -1618
6/21/2008 1648 -1650
6/21 /2006 1718 -1719
6/21/2006 1727 -1807
6/21/2006 1806 -1808
6/21 /2006 1811 -1820
6/21/2006 1822-1904
6/21/2006 1907.1925
6/22/2006 1306 -1307
622/2006 1315 -1318
6/22/2006 1319-1321
6/22/2006 1322-1328
6/22/2006 1330-1332
622/2006 1335 -1407
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-06
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1801 & 1807 compressors shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1800 STV/1P compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 SWAP compressor shutdown on high discharge temp
1800 SWAP compressor shutdown on high discharge temp
1800 SWAP compressor shutdown on high discharge temp
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Prepare to start 1801 & 1807 compressors
Prepare to start 1801 compressor - unable") start
Prepare to start 1800 compressor
Prepare t0 start 1800 compressor
Prepare 10 start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
6/21/2008 1613 -1618 4
6/21/008 1648 -1650 0
6/21/2006 1718-1719 0
6/21/2006 1727.1807 2
6/21/2006 1806-1808 0
6/212006 1811 -1820 0
6/21/2006 1822 -1904 3
6/21/2006 1907 -1925 1
6/22/2006 1306 -1307
8/22/2008 1315 -1318
6/22/2006 1319 -1321
6/22/2006 1322 -1328
6/22/2006 1330-1332
6/22/2008 1335 -1407
Total Flare a 1 Hour 12
Total Flare > 1 Hour 0
Volume Flared 12
Measured Safety Pilot 180
Continuous Assist 2,088
TOTAL FLARED 2,280
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER P10. 219
PRUDHOE BAY, NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-06
VOLUME
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
1801 & 1807 compressors shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown On high exhaust stack temp
1501 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1800 STVAP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown an high discharge temp
1800 STVAP compressor shutdown on high discharge temp
PLANNED
UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Prepare to start 1801 & 1807 compressors
Prepare to start 1801 compressor - unable to start
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
VOLUME
DATE TIME (Meet) DESCRIPTION OF INCIDENTS & CAUSE
6/21/2006 1613 -1618 5
6/21/2006 1648 -1650 0
6/21/2006 1718.1719 0
6/21/2006 1727 -1807 4
6/21/2006 1806 -1808 0
6/21/2006 1811 -1820 0
6/21/2008 1822 -1904 5
6/21/2006 1907 -1925 1
6/22/2006 1306 -1307
6/22/2006 1315 -1318
6/22/2006 1319 -1321
6/22/2008 1322 -1328
6/22/2008 1330 -1332
6/22/2006 1335-1407
Total flare r_ 1 Hour 18
Total flare > 1 Hour 0
Volume Flared 18
Measured Safety Pilot 205
Continuous Assist 2,437
TOTAL FLARED 2,660
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-06
1801 & 1807 compressors shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high eldiaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1800 STV/IP compressor shutdown on high discharge temp
1800 STV/IP compressor shutdown on high discharge temp
1800 STY/IP compressor shutdown on high discharge temp
1800 STV/IP compressor shutdown on high discharge temp
1800 STV/IP compressor shutdown on high discharge temp
1800 SWAP compressor shutdown on high discharge temp
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Prepare to start 1801 & 1807 compressors
Prepare to start 1801 compressor - unabS to start
Prepare 10 start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressors
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
Prepare to start 1800 compressor
Prepare to Mart 1800 compressor
Prepare to Mart 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
VOLUME
DATE TIME (Micf) DESCRIPTION OF INCIDENTS & CAUSE
6/21/2006 1613-1618 16
6/21/2006 1648-1650 0
6/21/2006 1718 -1719 0
6/21/2006 1727.1807 12
6/21/2006 1806.1808 0
6/212006 1811-1820 1
6/21/2006 1822 -1904 14
6/21/2006 1907-1925 5
6/22/2006 1306 -1307 0
6/22/2006 1315 -1318 0
6/22/2006 1319 -1321 0
6/22/006 1322 -1328 1
6/22/2006 1330 -1332 0
6/22/2006 1335 -1407 11
Total Flare a 1 Hour 60
Total Flan > 1 Hour 0
Volume Flared 60
Measured Safety Pilot 729
Continuous Assist 8,824
TOTAL FLARED 9,413
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-06
1801 & 1807 compressors shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1801 compressor shutdown on high exhaust stack temp
1800 SNAP compressor shutdown on high discharge temp
1800 STV/IP compressor shutdown on high discharge temp
1800 STV/IP compressor shutdown on high discharge temp
1800 STVAP compressor shutdown on high discharge temp
1800 STV/IP compressor shutdown on high discharge temp
1800 STV/IP compressor shutdown on high discharge temp
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Prepare to start 1801 & 1807 compressors
Prepare to start 1801 compressor - unable to start
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Prepare to start 1800 compressor
Compressor started
1. Facility Number
0290000009
2 Facility Name
PBU LISBURNE PROD (GPMA)
3. Flew
a . Operator I. MornNYeerd Disposition
BP (July -2008
PBU - GPMA
Drspo&Uon
Volume MCF
20. For production from multiple pools, list o0ntrittaon down pool 8e a percent d
Total Valente.
8. sow
39,387
Pod Name
Pool Code
Percent
7. Reinjected
6,128,324
Lisburne
640144
42.3%
Niakuk & West Niakuk
640148
1.2%
8. Flared or vented 1 lour or teas
470
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
9 Flared or vented more than 1 hour (see Instr.)
0
Raven - Ivishak - Sag River
640147
1.6%
West Beach
840188
0.0%
10. Porn and Purge
12514
11. Used for lease operations (specify in Remarks)
961,191
..
12. Omer (see instructions)
480,910
Authoriza >1
Safety
MCF
13. TOTAL VOLUME (ITEMS 6
7,622,776
Lease Use
MCF
14. NGL Gas Equivalent
39,367
Conaervltlbn
MCF
15. Purchased gas
0
Waste:
MCF
2,877,542
Commissioner Date
16. Transfenedfronm
17. Tram to: (Express as a negative e) CGF
0
18. Remarks: Block 11: Fuel Gas = 762,115 mscf and Assist Gas = 199,076 toed; Block 12: Lif Gas Off Field: Block 16: Mt and Fuel Gas from Prudhoe
I hereby certify that the foregoing is true and coned to me best of my knowledge.
Manager, State Production Taxes
Signature L Tide and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psle
and to a temperature of 60o F.
Authority 20 AAC25.235.
Printed Name Bernard W. ajny Phone (907)564 -5028 Date 81( 1 ^f /6 6
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
7/23/2006
7/23/2006
7/23/2008
7/23/2006
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1057 -1101
1344 -1403
1404 -1417
1418 -1419
Total Ftare ca 1 Hoot 452
Total Flares 1 Hour 0
Volume Flared 452
Measured Safety Pilot 11,268
Continuous Assist 182,276
TOTAL FLARED 193,996
49 Bleeding down MI fine
304 Bleeding down MI line
95 Bleeding down MI line
4 Bleeding down MI Fine
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-06
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned
Unplanned
Unplanned
Unplanned
Temporary cessation of bleed down
Temporary cessation of bleed down
Temporary cessation of bleed down
Finished bleed down of M1 Nne
7/23/2006 1057 -1101 0
7/23/2006 1344 -1403 0
7/23/2006 1404 -1417 0
7/23/2006 1418 -1419 0
Total Flare r 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Bleeding down MI line
Bleeding down MI Nne
Bleeding down MI fine
Bleeding down MI The
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-06
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
Unplanned
Unplanned
Unplanned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Temporary cessation of bleed down
Temporary cessation of bleed down
Temporary cessation of bleed down
Finished bleed down of MI line
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
7/23/2006 1057 -1101 0
7123/2006 1344 -1403 0
7/23/2008 1404 -1417 0
7/23/2008 1418 -1419 0
Total Flare a 1 Hour O
Total Flare s 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Bleeding down MI line
Bleeding down MI line
Bleeding down MI line
Bleeding down MI fine
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-06
PLANNED
UNPLANNED
Unplanned
Unplanned
Unplanned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Temporary cessation of bleed down
Temporary cessation of bleed down
Temporary cessation of bleed down
Finished bleed down of MI Mine
•
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
7/23/2006 1057 -1101 0
7/23/2006 1344 -1403 0
7/23/2006 1404 -1417 0
7/23/2006 1418-1419 0
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Bleeding down MI fine
Bleeding down MI fine
Bleeding down MI line
Bleeding down MI line
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-06
PLANNED
UNPLANNED
Unplanned
Unplanned
Unplanned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Temporary cessation of bleed down
Temporary cessation of bleed down
Temporary cessation of bleed down
Finished Need down of MI IMIs
VOLUME
DATE TIME (Mscl) DESCRIPTION OF INCIDENTS & CAUSE
7/23/2006 1057 -1101 1
7/23/2006 1344 -1403 4
723/2006 1404 -1417 2
7/23/2006 1418-1419 0
Total Flare c= 1 Hour 7
Total Flare .> 1 Hour 0
Volume Flared 7
Measured Safety P1101 159
Continuous Assist 2,727
TOTAL FLARED 2,893
Bleeding down MI ine
Bleeding down MI line
Bleeding down M1 tine
Bleeding down MI One
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-06
PLANNED
UNPLANNED
Unplanned
Unplanned
Unplanned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Temporary cessation of bleed down
Temporary cessation of bleed down
Temporary cessation of bleed down
Finished deed down of MI Nne
DATE TIME
7/23/2006 1057 -1101
7/23/2006 1344 -1403
7/23/2006 1404-1417
7/23/2006 1418 -1419
Total Flare a 1 Hour 11
Total Flare .> 1 How 0
Volume Flared 11
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
1 Bleeding down MI line
7 Bleeding down MI line
3 Bleeding down MI line
0 Bleeding down MI line
435
6,466
6,912
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-06
VOLUME
(Macf) DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
Unplanned
Unplanned
Unplanned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Temporary cessation of bleed down
Temporary cessation of bleed down
Temporary cessation of bleed down
Finished bleed down of MI line
7/23/2006
7/23/2006
7/23/2006
7/23/2006
VOLUME
TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE
1057 -1101
1344 -1403
1404 -1417
1418-1419
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pllot 652
Continuous Assist 7,607
TOTAL FLARED 8,259
0 Bleeding down Mt line
O Bleeding down MI line
O Bleeding down MI fine
O Bleeding down MI fine
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-O8
PLANNED
UNPLANNED
Unplanned
Unplanned
Unplanned
Unplanned
ACTON TAKEN TO ELIMINATE CAUSE
Temporary cessation of bleed down
Temporary cessation of bleed down
Temporary cessation of bleed down
Finished bleed down of MI Inc
1 Facility Number
0290000009
Facility Name
12 Fa PBU LISBURNE PROD (GPMA)
3 Field 14 opOperator
PBU - GPMA I BP
5. sbmWVeard Disposition Disposition
( August - 2006
Disposition
Volume MCF
20. For production from multiple pools. list contribution of each pod as a percent of
Total Volume
8. Sold
58,757
Pod Name
Pod Code
Percent
7. Reinjected
6647 926
Lisburne
640144
42.3%
Niakuk 8 West Niakuk
640148
1.2%
8. Flared or veined 1 hour a less
0
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
9. Flared than
1 hour (see Instr)
0
Raven • Ivishak - Sag River
640147
1.6%
vented
or ved more
West Beach
640186
0.0%
to. Pilot and Forge
12,813
11. Used for lease operations (specify In Remarks)
846,671
—
12. Oster (see instructions)
141
Authorization >1 hr:
Safety
MCF
13. TOTAL VOLUME (ITEMS 6
7,566,310
Lease the
MCF
14. NGL Gas Equivalent
58,757
Conservation
MCF
15. Pixdased gas
0
Waste:
MCF
16. Transferred tram:
2,225,064
Commissioner Date
17. Transferred to: (Es as a negative s) CGF
(Erns
0
18. Remarks: Block 11: Fuel Gas = 727,676 ntscf and Assist Gas = 1 18,995 mucf; Block 12: Lif Gas Off Field; Block 16: MI and Fuel Gas from Prudhoe
I hereby carry that oregarlg b true to the best d my knowledge.
(l 111 Manager, State Production Taxes
Signature ! e f. 1100 and Royalty
Note: All volumes must be
corrected to pressure of 14.65 psla
and ut a city temperature AAA S. 35. F.
Authority 20 AAC25.235-
Printed Name Bemard W. Hajny v Phone (907),564 -5028 Date 9
•
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
ft
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare c= 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 11,559
Continuous Assist 107.402
TOTAL FLARED 118,961
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flint r 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total flare c= 1 Hour 0
Total Rant > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-06
VOLUME PLANNED
DATE TIME (Mad) DESCRIPTION OF INCIDENTS A CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flan r_ 1 Hour 0
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 169
Continuous Assist 1,556
TOTAL FLARED 1 ,725
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-06
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare >1Hour 0
Volume Flared 0
Measured Safety Pilot 264
Continuous Assist 2,444
TOTAL FLARED 2 708
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-06
VOLUME PLANNED
DATE TIME (Mitt) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Vofutne Flared 0
Measured Safety Pilot 821
Continuous Assist 7,593
TOTAL FLARED 8,414
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-06
i FsdMy Number
0290000009
2 Facility Name
PBU LISBURNE PROD (GPMA)
3 Field
4. Operate
I BP
5. Month/Year 01 Disposition
September - 2006
PBU - GPMA
Disposition
Volume MCF
20. For production from multipe pools, list contribution of each pod as a percent of
Total Volume.
6. Sold
85,466
Pod Name
Pool Coda
Percent
7. Reinjected
7,159,937
Lisburne
640144
42.3%
Niakuk & West Niakuk
640148
1.2%
6. Fared a vented 1 now a less
488
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
9. Flared or than vented more an 1 how (see Intr.)
8,132
Raven • Ivishak - Sag River
640147
1.6%
West Beach
640186
0.0%
10. Plot and Purge
12,579
11. Used for lease operations ( specify in Remarks)
779,811
12. Omer (see instructions)
760,146
qutari2atlan >1 M.
Safety
MCF
13. TOTAL VOLUME (REMS 6.12)
8,806,559
Lease Use
MCP
14 NOL Gas Equivalent
85,466
Conservation
MCF
15. Purchased gas
D
Waste -
54 13l
MCF
18. Transferred Iran:
2,261,910
n '!//_?�
/Ay � Nnl" _ "/ Date
17. Trnsferred to' (Express as a negative sl (:GF
0
16. Remarks. Block 11: Fuel Gas = 670,630 mscf and Assist Gas • 109,18! 1mcf; Block 12: Litt Gas Off Field; Block l6: Ml and Fuel Gas froth Prudhoe
I hereby certify that the foregang
Signature —,
is rue and • . 10 the best al my knowledge,
Manager, State Production Taxes
mis and Royalty
Note: All volumes must be
corrected to pressure of 14.65 pole
and to a temperature of 60o F.
Authority 20 AAD25.235.
_
/ � ,
Printed Name :: mard W. liajny Phone (907)564.5028 Date �j / —/8 z�(-
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Form 10-422 Rev. 1/2004
Submit in Duplicate
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS d CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/17/2006 0851 -0909 468 22E038SDV failed to open
Tots/ Flare a 1 Hour 466
9/29/2006 0959 -1256 6,926 Emergency shutdown due to as release at drill site L-2
9/30/2006 0332 -2053 694 Plant restart after emergency shutdown
Total Flare > 1 Hour 7,620
Volume Flared 8,086
Measured Safety Pilot 11,909
Continuous Assist 103,119
TOTAL FLARED 123,114
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-06
Unplanned Instrumentation repaired the problem
Unplanned Depressured RGI line
Unplanned Proceed with startup
Total Flare c= 1 Hour 0
Total Flare, 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS it CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/17/2006 0851 - 0909 0 22E036SDV failed to open Unplanned Instrumentation repaired the problem
09/29/06 0959-1256 0 Emergency shutdown due to gas release at drib site L -2 Unplanned Depreasured RGI line
09/30/08 0332 -2053 0 Plant restart after emergency shutdown Unplanned Proceed with startup
9/17/2008 0851-0909 0 22E036SDV failed to open
Total Flare at 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Instrumentation repaired the problem
09/29/06 0959 -1256 0 Emergency shutdown due to gas release at dri9 site L -2 Unplanned Depressured RGI line
09/30/76 0332 -2053 0 Plant restart after emergency shutdown Unplanned Proceed with startup
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/17/2006 0851 -0909 0 22E036SDV failed to open Unplanned Instrumentation repaired the problem
09/29/06 0959 -1256 0 Emergency shutdown due to gas release at dna site L -2 Unplanned Depressured RGI line
09/30/06 07go -2053 0 Plant restart attar emergency shutdown Unplanned Proceed with startup
VOLUME PLANNED
DATE TIME (MSC!) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/17/2006 0851 -0909 4 22E036SDV faded to open
Total Fiere a 1 Hour 4
09/29/06 0959 -1256 59 Emergency shutdown due to gas release at drip site L -2 Unplanned Oepressured RGI line
09/30/06 0332 -2053 0 Plant restart after emergency shutdown Unplanned Proceed with startup
Total Hero > 1 Hour 59
Volume Flared 63
Measured Safety Pilot 122
Continuous Assist 1,1
TOTAL FLARED 1,350
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-06
Unplanned Instrumentation repaired the problem
Total Flare a 1 Hour 6
Total Flare> 1 Hour 73
Volume Flared 79
Measured Safety Pilot 151
Continuous Assist 1,626
TOTAL FLARED 1,656
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-o6
VOLUME PLANNED
DATE TIME (Maui) DESCRIPTION OF INCIDENTS & CAUSE
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/1 772006 0651 - 0909 6 22E038SDV Need to open Unplanned Instnimentation repaired the problem
09/29/06 0959 -1256 73 Emergency shutdovm due to gas release at drill site L -2 Unplanned Depressured ROI Ilene
09/30/06 0332 -2053 0 Plant restart after emergency shutdown Unplanned Proceed with startup
Total Flaro a 1 Hour 12
Total Flare> 1 Hour 380
Volume Flared 392
Measured Safety Pilot 397
Continuous Assist 3,471
TOTAL FLARED 4 ,260
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-06
VOLUME PLANNED
DATE TIME (Matt) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/17/2006 0851 12 22E036S0V failed to open Unplanned Insbumentaeon repaired the problem
0929/06 0959.1258 380 Emergency shutdown due to gas release at drill site L-2 Unplanned Depressured RGI line
09/30/06 0332-2053 0 Plant restart alter emergency shutdown Unplanned Proceed with startup
t>
FACILITY: LPC DATE: 29 Sep 2006
SYSTEM
1. Other
First Determination of Cause:
1. emerency shutdown due to gas release at drill site L -2
Action Taken to Stop Flaring:
1. Depressured RG I line
Wednesday, October 18, 2006
REPORT NO: 06 -0556
BPXA FLARE REPORT
PRUDHOE BAY
TIME OF FLARING
Start Stop Duration
09:59 12:56 2Hrs 57Mint
Black
Intermittent Smoke Planned VOLUME
❑ ❑ 1435. MSCF
TOTAL VOLUME' 14;26 MSCF
Page 1 of 1
bp
0
FACILITY: LPC
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
3. Flare/Relief Valve
4. Flare/Relief Valve
5. Flare /Relief Valve
6. Flare/Relief Valve
7. Flare/Relief Valve
8. Flare/Relief Valve
9. Flare /Relief Valve
10. Flare/Relief Valve
03:32
03:48
16 :26
16:36
18:19
18:24
18:38
18:43
18:53
20:45
First Determination of Cause:
1. Plant Restart after an ESD.
2. Plant Restart after an ESD.
3. Restart Plant after an ESD.
4. Restart Plant after an ESP.
5. Restart Plant after an ESD.
6. Restart Plant after an ESD.
7. Restart Plant after an ESD
8. Restart Plant after an ESD.
9. Restart Plant after an ESD.
Monday, October 02, 2006
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 30 Sep 2006
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
03:33
03:49
16:27
16:37
18:20
18:35
18:41
18:51
20:02
20:53
OHrs
O Hrs
OHrs
0 Hrs
OHrs
OHrs
0 Hrs
O Hrs
1Hrs
0 Hrs
1 Mins
1 Mins
1 Mins
1 Mins
1 Mins
11 Mins
3Mins
8Mins
9Mins
8Mins
REPORT NO: 06 -0561
❑ ❑ ❑ 4 MSCF
❑ ❑ ❑ 23 MSCF
❑ ❑ ❑ 10 MSCF
❑ ❑ ❑ 7 MSCF
❑ ❑ ❑ 13 MSCF
❑ ❑ ❑ 98 MSCF
❑ ❑ ❑ 5 MSCF
❑ ❑ ❑ 10 MSCF
❑ ❑ ❑ 129 MSCF
❑ ❑ ❑ 395 MSCF
TOTAL VOLUME 694 MSCF
Page 1 of 2
FACILITY: LPC DATE: 30 Sep 2006
Action Taken to Stop Flaring:
1. Proceed with start-up.
2. Proceed with Start-up
3. Proceed with Start-up
4. Proceed with Start-up.
5. Proceed with Start-up
6. Proceed with Start-up
7. Proceed with Start-up
8. Proceed with Start-up.
9. Proceed with Start-up.
REPORT NO: 06 -0561
BPXA FLARE REPORT
PRUDHOE BAY
Monday, October 02, 2006 Page 2 of 2
GPB Gas Flaring Incident
Subject: GPB Gas Flaring Incident
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
Date: Sat, 30 Sep 2006 09:31:43 -0800
To: "steve_mcmains @admin.state.ak.us" c'seve mcmains @admin.state.ak.us'>, "GPB, Environ TL" <GPBEnvironTL@BP.conv, "GPB, ."
Environ Advisor East" <GPBEnvironAdvisorEast@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary A"
<Gary.Benson@BP.com >, "Pfeiffer, Jim A" <Iim.Pfeiffer@BP.com >; "GPB, GPMA Area Mgr" <GPBGPMATL@BP.con>y,, "Kurz, John"
<john.kun@BP.com
To: Steve McMains, AOGCC
steve_mcmains @admin. state. ak. us
907- 793 -1241, fax 907- 276 -7542
From: Michael Bolkovatz, GPB Prod Optim Team Leader
An extended gas venting and flaring event occurred at GPMA DS L2 on September 28. There was a failure on the high
pressure gas reinjection line that required depressuring the line from LPC to LGI. LPC was shutdown at 0900 and all
gas was initially sent to flare. Gas venting was initiated at LGI pad to increase the rate of depressuring due to
increasing LEL gas levels in Module 4902 at L2. All gas venting /flaring stopped at 1432 hrs when the pressure on the
gas injection header was bled to 0 psi. The total flared volume was 6.4 MMSCF and the total volume vented (through
the leak and at LGI) was 1.1 MMSCF.
If you require additional information, please don't hesitate to call.
Michael Bolkovatz
GPB Production Optimization TL
(907) 659 -5566
I of 1 10/2/2006 7:58 AM
•
AOGCC Memorandum
Date: November 2, 2006
To: Commissioners
n �� 11 ,2"Gc.
From. Jim Regg, Petroleum Engineer } "
Subject: Gas Disposition September 2006 — Lisbume Production Center
A leak on the high- pressure gas reinjection line within the Lisburne L2 manifold building
occurred September 28, 2006. BP made proper notification of the gas release and followed up
with a 1 -page written summary. Investigation by BP revealed that the leak occurred due to
insufficient torque on a blind flange, resulting in a line failure between the blind flange and a
plug valve. Gas from the leak accumulated in the L2 manifold building causing the Lisburne
Production Center ( "LPC ") to be shut down.
BP reports on its September 2006 Gas Disposition Report (Form 10 -422) for LPC that a total of
8,132 Mcf of gas was flared and vented longer than 1 hour as a result of this event. Of that total
7,438 Mcf was a direct result of the leak and depressuring the high- pressure gas line; this volume
should be deemed waste. The remaining 694 Mcf of gas was a result of flaring during the restart
of LPC on September 30. While the decision to make the September 30 volume waste is less
definitive, I recommend we also declare as waste the 694 Mcf of gas associated with plant restart
since it is a direct result of the incident. The total volume deemed waste associated with this
event would be 8,132 Mc f.
Attached is a copy of the Gas Disposition Report for signature; also attached is the forwarding
letter to Department of Revenue notifying them of the Commission's waste determination.
2 Attachments
1. Fadtily Number
0290000009
12. Facility Name
I PBU LISBURNE PROD (GPMA)
3. Field
PBU - GPMA
4. Operator 5. MmWr d Disposition Disposition
BP October - 2006
Dispotluon
Volume MCF
20. For production from multiple pods, list contribution of each pool as a preen 01
Total Volume.
5. SOIt1
77,409
Pool Name
Pod Code
Pro9nt
7 Reinjected
6,356,457
Lisburne
640144
42.3%
Niakuk 8 West Niakuk
640148
1.2%
9. Flared ot vaned 1 nor d less
1,108
North Prudhoe Bay State
640152
0.0%
Pt. McIntyre
640180
54.9%
9 Fired or vented mote than 1 hour (see Insr)
0
Raven - Ivishak - Sap River
640147
1.6%
West Beach
640186
0.0%
10. Plot and Purge
13,099
11. used fdr lease evocations (specify In Remarks)
834,183
12. Other (sea Insnuctlons)
965,420
Authorization >1 M:
Safety
MCF
13. TOTAL VOLUME (ITEMS 8-12)
8,247,676
Lease Use
MCF
14. NGL Gee Equivalent
77,409
Canservaeon
MCF
15. Purenasee gas
0
Waste.
MCF
18. Transbnednam:
2,571,595
Commissioner °ite
17. Transferred to: (Egress as a negative 8) CGF
g
0
18. Remarks: Block 11: Fuel Gas = 709,230 rltscf and Assist Gas = 124,953 ntscf; Block 12: Lift Gas Off Field; Block 16: MI and Fuel Gas from Prudhoe
I hereby certify that tie foregoing n and b the best d my knowledge.
Manager, State Production Taxes
Signature � Tale and Royalty
Note: All volumes must be
corrected to pressure of 14.65 pale
and to a temperature of 60o F.
Authority 20 MC25235.
Printed Name Bernard W. Hajny Phone (907)584 -5028 Date if /7 &
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit In Duplicate
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
10)1/2006 0022-0050 966
10/3/2006 0951-0952 2
10/10/2006 0315-0317 25
Total Flare a 1 Hour 993
Total Rare > 1 Hour 0
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
993
11,926
113,951
126,670
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oet-06
Restart plant after an ESD
Depresaure EOR for valve repair
Power outage
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PLANNED
UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
Unplanned Continued procedure for restart
Planned Completed depreseurkp EOR
Unplanned Restored power
10/1/2006 0022-0050 0
10/3/2006 0951-0952 0
10/10/2006 0315 0
Total Flare a 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-06
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 6 CAUSE
Restart plant after an ESD
Depressors FOR for valve repair
Power outage
PLANNED
UNPLANNED
Unplanned
Planned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Continued procedure for reshot
Completed depressudn/ FOR
Restored power
DATE
10/1/2006
10/3/2006
10/10/2006
00220050 0
09514952 0
03150317 0
Total Flare a 1 Hour 0
Total Flare > f Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Restart plant after an ESD
Depressure EOR for valve repair
Power outage
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Od-06
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
Unplanned
Planned
Unplanned
Continued procedure for restart
Completed depressurinp EOR
Restored power
10/112006
10/3/2008
10/10/2008
VOLUME
TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
0022-0050
0951 -0952
0315-0317
Total Flan a= 1 Hour 0
Total flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
O Restart plant after an ESD
O Depressors EOR for valve repair
O Power outage
SP EXPLORATION ALASKA. INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-06
PLANNED
UNPLANNED
Unplanned
Planned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Continued procedure for restart
Completed depreseudng EOR
Restored power
10/1/2006
10/3/2006
10/10/2006
0022-0050 22
0951-0952 0
0315 -0317 0
Total Flare a 1 Hour 22
Total Flare a. 1 Hour 0
Volume Flared 22
Measured Safety Pilot 193
Continuous Assist 1,851
TOTAL FLARED _ 2,066
vsas
Restart plant after an ESD
Depressure EOR for valve repair
Power outage
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-06
VOLUME
TIME (Mscp DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
Unplanned
Planned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Continued procedure for restart
Completed depressuring EOR
Restored power
Me
VOLUME
DATE TIME (Meet) DESCRIPTION OF INCIDENTS A CAUSE
10/1/2006 0022-0050 16
10/3/2006 0951-0952 0
10/10/2006 0315-0317 1
Total Flare 1 Hour 17
Total Flare > 1 Hour 0
Volume Flared 17
Measured Safety Pilot 206
Continuous Assist 1,918
TOTAL FLARED 2,141
Restart plant after an ESD
Depressure EOR for valve repair
Power outage
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-06
PLANNED
UNPLANNED
Unplanned
Planned
Unplanned
ACTION TAKEN TO EUMINATE CAUSE
Continued procedure for restart
Completed depreesudng EOR
Restored power
10/1 /2006
10%312006
10/10/2006
Total Flare ct 1 Hour 76
Total Flare , 1 Hour 0
Volume Flared 78
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
0022-0050 74
0951-0952 0
0315-0317 2
774
7,233
8,083
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-08
VOLUME
TIME (Masi) DESCRIPTION OF INCIDENTS 8 CAUSE
Restart plant after an ESD
Depressure EOR for valve repair
Power adage
PLANNED
UNPLANNED
Unplanned
Planned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Continued procedure for restart
Completed depreswriny EOR
Restored power
FACILITY: LPC DATE: 03 Oct 2006
First Determination of Cause:
1. Depressure EOR for valve repair
Action Taken to Stop Flaring:
1. Completed depressuring EOR
BPXA FLARE REPORT
PRUDHOE BAY
REPORT NO: 06-0565
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 09:51 09:52 O Hrs 1 Mins ❑ ❑ Q 2 MSCF
TOTAL VOLUME 2 MSCF
Thursday, November 16, 2006 Page 1 of 1
I1. Facility Number 12 Facility Name
3 FField
4. Operator
(BP
5. MgnUWeeld Deposition
November - 2006
0290000009 POU LISBURNE PROD (GPMA)
PBU •GPMA
Disposition
Volume MCF
w/
/
/West
20. For production from multiple pods. eat contribution ot each pool as • percent of
Total VdMne
6. Sold
88,799
Pool Name
Pod Code
Percent
7. Reelected
7,216,684
Lisburne
640144
42.3%
Niakuk & West Niakuk
640148
1.2%
8. Flared o veined 1 (hour o lase
0
North Prudhoe Bay State
640152
0.0%
P1. McIntyre
840180
54.9%
9. Flared or vented more than 1 (lore (See instr.)
5,178
Raven - Ivishak -Sag River
640147
1.6%
Beach
640188
0.0%
to. Plot and Purge
12,780
11. Used to lease operations (specify in Remarks)
914,391
12. Other (see Instruction)
1,142,719
Authorization >1 hr.
Safety
S' �
Q
MCF
13. TOTAL VOLUME (ITEMS 8-12)
9,380,551
Lease Use
MCF
14. NGL Gas Equivalent
88,799
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
18. Transferred from:
1,909,348
�/D /. /c 0 7
14C C Date
17. Transferred to: (Express as a negative 0) CGF
0
l& Remarks: Block 11: Fuel Gas = 782,216 mscf and Assist Gas = 132,175 mscf; Block 12: Lift Gas Off Field Block l6: MI and Fuel Gas from Prudhoe
1 hereby certify that the f, ; .. . is true - nd •• - • to the Sato* my knowledge.
/ Manager, State Production Taxes
Spnsbwe a i o - - AS Tde and Royally
Note: All volumes must be
corrected to pressure of 14.65 psis
and to a temperature of 60o F.
Authority 20 AAG25.235-
1 '
Printed Name Bernard W. Hajny
Phone (907)564 -5028 Dote /a• /F"t
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA O!L AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
11/2412008 1531 -1910 4,777 Depre.sured 24 inch common line
Total Flares 1 Hour 4,777
Volume Flared 4,777
Measured Safety Pilot 12,025
Continuous Assist 124,039
TOTAL FLARED 140,841
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-08
Unplanned Production fiowbne deprsseured
Total Flare « 1 Hour 0
1124/06 1531 -1910 0 Depressured 24 arch common line
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS it CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Production ?towline depressured
Total Flare a 1 Hour 0
11/24/06 1531 -1910 0 Depreawred 24 inch common fine
Total Flare> 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-06
VOLUME PLANNED
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Production flowline depressured
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
VOLUME PLANNED
DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
Total Flare a 1 Hour 0
11/24/06 1531 -1910 75 Depressured 24 inch common line
Total flare > 1 Hour 75
Volume Flared 75
Measured Safety Pilot 139
Continuous Assist 1,488
TOTAL FLARED 1,680
PRUDHOE BAY, NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov.06
Unplanned Production flowline depressured
VOLUME PLANNED
DATE TIME (Mach DESCRIPTION OF INCIDENTS 6 CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare a 1 Hour 0
11/24/06 1531.1910 55 Depressured 24 inch common Inge
Total Flares 1 Hour 55
Volume Flared 55
Measured Safety Pilot 142
Continuous Assist 1,485
TOTAL FLARED 1,682
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WESTERN NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-06
Unplanned Production Bowline depressured
Total Flare a 1 Hour 0
11/24/08 1531 -1910 271 Depressured 24 inch Common line
Tots, Flare > 1 Hour 271
Volume Flared 271
Measured Safety Pilot 474
Continuous Assist 5,185
TOTAL FLARED 5,930
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-06
VOLUME PLANNED
DATE TIME (Msef) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Production 'towline depressured
• When printing this report, the repon is best viewed in landscape mode with the margins at .5 incites
Flare Start Date 11/1/2008
Flare End Date 11/30/2008
LPC Flare Report
Total Volume
MSCF)
5178
Time Of Flaring
Report Number Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
(MSCF)
System
08 - 182 Controlled Blowdown 11/24/2006 3:31:00 PM 7:10:00 PM 219 minutes No No No BPI■CATESDR 5178
Determination Cause Depressured 24 common - line.
Action Taken Production flowlkre depressured
Daily Volume (MSCF) 5178
Total Volume 5178
MSCF)
Generated 12!312008 Page 1 of 1
GPB Gas Flaring Incident
Subject: GPB Gas Flaring Incident
From: "GPB, Prod Opt TL" <GPBProdOptTL @BP.com>
Date: Sat, 25 Nov 2006 10:14:14 -0900
To: steve mcmains@admin.state.ak.us
CC: "GPB, Environ TL" <GPBEnvironTL@BP.com >, "GPB, Environ Advisor East"
<GPBEnvironAdvisorEast@BP.com >, "Fiedler, Anne M" <Anne.Fiedler@BP.com >, "Benson, Gary
A" <Gary..Benssonn ®BP.com >, "Pfeiffer, Jim A" <Jim.Pfeiffer@BP.com >, "GPB, GPMA Area Mgr"
G cGP P' MATL@BP.cem >ap 4" a . lys . ..v..a t. 9i:icaa'
To: Steve McMains, AOGCC
steve_mcmains@admin.state.ak.us
907 - 793 -1241, fax 907 - 276 -7542
From: Michael Bolkovatz, GPB Prod Optimization Team Leader
An extended flaring event occurred at GPB on November 24, 2006.
The L1 to LPC commoniine was being deinventoried (several pigs were
previously run through the line to displace the liquids) and depressured in
preparation for removal. Gas was flared during the depressuring process. A
total of 5178 MSCF was flared and the event lasted from 15:31 to 19:10 (219
minutes).
If you require additional information, please don't hesitate to call me.
Michael Bolkovatz
GPB Prod Optimization Team Leader
(907)- 659 -5566
le of 1 11/26/2006 1:07 PM
1. Facility umber
N
0290000009
12. Facility Name
I M
IPBU LISBURNE PROD (GPMA)
3. Flea
PBU - GPMA
14. 15. MoMonth/Year d Disposition
Operator
IBP December - 2008
Disposition
Volume MCF
20. For production ham multiple pools, list contribution death pool as s percent d
Total Volume.
8. Sold
102,501
Pool Name
Pool Code
percent
7. Reinjected
7,191,867
Lisburne
640144
42.3%
N iakuk & West Niakuk
840148
1.2%
w
8. Flared or vented 1 hour or less
344
N orth Prudhoe Ba Stet a
640152
0.0%
Pt. Mcln re
640180
54.9%
m
9. Flared or vented more than 1 hour (see abtr.)
0
R aven - Ivishak - Sa! Rig Br
640147
1.6%
West Beach
640186
0.0%
10. Pad and Purge
13,187
11. Used for lease operations (specify in Remarks)
873,383
Authorization „tfir
Safety
12. Other (see instructions)
2,114,645
13. TOTAL VOLUME (ITEMS 612)
10,295,907
Lease Use
MCF
14. NGL Gas Equivalent
102,501
Conservation
MCF
15. Purchased gas
0
Waste:
MCF
18. Transferred from:
2,487,679
Commissioner Date
17. Transferred to: (Express as a negative e) CGF
0
18. Remarks: Block 11: Fuel Gas = 758.971 ntscf and Assist Gas = 1 14,412 muf; Block 12: Lift Gas Off Field; Block 16: MI and Fuel Gas from Prudhoe
1 hereby comfy that Me foregoing is true and correct to the best d my knowledge.
Manager, State Production Taxes
Signature ` 1 U"nat. v1e k—, The and Royal
Note: All volumes must be
corrected to pressure of 14.65 pale
and toe temperature of 60o F.
Authority 20 AAC25 .235.
( /0 -1
Panted Name Bernard W. Hajny Plans (907)564 -502e Date 1
Form 10-422 Rev. 1/2004
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Submit in Duplicate
12/4/2008 0058-0100
12/4/2026 0518-0520
12/11/2008 1221 -1223
12/11/2006 1339-1341
Total Flare r_ 1 Hour 309
Total Flare ) 1 Hour 0
Volume Flared 309
Measured Safety Pilot 12,187
Continuous AssIst 105,877
TOTAL FLARED 118,373
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -07
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
196 1808 Turbine /Compressor shutdown for scheduled water wash
48 1808 Turbine/Compressor shutdown for scheduled water wash
13 1808 TiC completed
52 1808 TIC completed
PLANNED
UNPLANNED ACTION TAKEN TO EUMIIATE CAUSE
Planned
Planned
Unplanned
Unplanned
1808 T/C depressurization completed
1808 T/C depressurization completed
Started 1808 T/C
Started 1808 TIC
DATE TIME
12/4/2006 0058-0100
12/4/2006 0516 -0520
12/11/2008 1221 -1223
12//112008 1339 -1341
Total Flare a 1 Hour 0
Total Flare > 1 Hour
Volume Flared
Measured Safety Pilot
Continuous Assist
TOTAL FLARED
VOLUME
(MSCF) DESCRIPTION OF INCIDENTS & CAUSE
O 1808 Turbine /Compressor shutdown for scheduled water wash
O 1808 Turbine/Compressor shutdown for scheduled water wash
O 1808 T/C completed
O 1808 T/C competed
0
0
0
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -07
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Unplanned
Unplanned
1808 T/C depressurization completed
1808 T/C depressurization completed
Started 1808 T/C
Started 1808 T/C
1
12/4/2006 0058-0100 0
12/4/2006 0518 -0520 0
12/11/2006 1221 -1223 0
12/11/2006 1339 -1341 0
Total Flare a 1 Hour
0
Total Flares 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist
TOTAL FLARED
0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -07
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE
1808 Turbine/Compressor shutdown for scheduled water wash
1808 Turbine /Compressor shutdown for scheduled water wash
1808 TIC completed
1808 TIC completed
PLANNED
UNPLANNED ACTION TAKEN TO EUMINATE CAUSE
Planned
Planned
Unplanned
Unplanned
1808 T/C depressurization completed
1808 T/C depreswrization completed
Started 1808 T/C
Started 1808 T/C
12/4/2006 0056
12/4/2008 0518-0520
12/11/2008 1221 -1223
12111/2008 1339 -1341
Total Fiore r_ 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Sarety Pilot
Ctlydinuous Asslst 0
TOTAL FLARED 0
0
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dee -07
VOLUME
DATE TIME (MSCF) DESCRIPTION OF INCIDENTS 8 CAUSE
0 1808 Turbine/Compressor shutdown for scheduled water wash
O 1808 Turbine/Compressor shutdown for scheduled water wash
O 1808 T/C completed
O 180817C competed
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Unplanned
Unplanned
1808 T/C depressurization competed
1808 T/C depreseudzation completed
Started 1808 T/C
Started 1808 T/C
DATE TIME
12/4/2006 0056-0100
12/4/2006 0518 -0520
12/112006 1221 -1223
12/112008 1339 -1341
Total Flare a 1 Hour 7
Total Flare a 1 How 0
Volume Flared 7
Measured Safety Pilot 199
Continuous Assist 1,730
TOTAL FLARED 1 ,938
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-07
VOLUME
(Msel) DESCRIPTION OF INCIDENTS & CAUSE
1808 Turbine/Compressor shutdown for scheduled water wash
1808 Turbine/Compressor shutdown for scheduled water wash
1808 T/C completed
4
2
0
1 1808 T/C completed
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Unplanned
Unplanned
18013 T/C depressurization completed
1808 T/C depressurization completed
Started 1808 T/C
Started 1808 T/C
DATE TIME
12/4/2006 0056 -0100
12/4/2006 0518 -0520
12/11/2006 1221 -1223
/2111/2006 1339-1341
Total Ram al Hour 5
Total Rant a. 1 Hour 0
Volume Flared 5
Measured Safety Pilot 132
Continuous Assist 1,152
TOTAL FLARED 1,289
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDNOE BAY, WESTERN NIAKUK
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -0T
VOLUME
(M$c) DESCRIPTION OF INCIDENTS & CAUSE
3 1808 Turbine/Compressor shutdown for scheduled water wash
1 1808 Turbine/Compressor shutdown for scheduled water wash
0 1808 T/C completed
1 1808 T/C completed
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Unplanned
Unplanned
1808 T/C depressurization completed
1808 T/C depressudration completed
Started 1808 T/C
Started 1808 T/C
VOLUME
DATE TIME (Mad) DESCRIPTION OF INCIDENTS & CAUSE
12/4/2006 0056-0100
12/4/2006 0518 -0520
12/11/2008 1221 -1223
12/11/2006 1339 -1341
Total Flare a 1 Hour 24
Total flare > 1 Hour 0
Volume Flared 24
Measured Safety Pilot 649
Continuous Assist 5,653
TOTAL FLARED 6,326
BP EXPLORATION ALASKA, INC,
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
USBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec -07
15 1808 Turbine /Compressor shutdown for scheduled water wash
5 1808 Turbine /Compressor shutdown for scheduled water wash
3 1808 T/C completed
1 1808 T/C completed
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Planned
Planned
Unplanned
Unplanned
1808 T/C depressurization completed
1808 T/C depressurization completed
Started 1808 T/C
Started 1806 T/C
Flare Start Dale 12/1/2006
Flare End Date 12/31/2006
06 Controlled Blowdown
Determination Cause
Action Taken
LPC Flare Report
MSCF)
Time Of Flaring
Report Number Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume (MSCF)
06-194 Controlled Blowdown 12/4/2006 12:58:00 AM 1:00:00 AM 4 minutes No No Yes BP1\MOOREKE2 218
1808 Reinjection compressor shutdown because of water wash schedualed
1808 T/C depressurization completed.
12/4/2006 5:18:00 AM 5 AM 2 minutes No No Yes BP1WOOREKE2 58
Determination Cause 1808 Reinjection compressor shutdown because of schedual water wash
Action Taken 1808 T/C depressurization completed.