Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBPXA - BADAMIALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Inc. Badami Jan-O1 Disposition Volume MCF' 'Indicate contribution of each pool to total. Pool Name ode Percent 60100 1. Sold Fuel NGL 0 0 2. Reinjected 242,430 3. Flared or vented less than 1 hour 78 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 670 5. Pilot and Purge 403 b. Used for lease operations Assist Fuel 0 32,673 7. Other TOTAL items 1-7 276,254 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from; 11. Transferred to: I hereby cert~ that the foregoing is true and correct to the best of my knowledge. Title INLcsR- T~k Date Form 10-422 Rev. 4/95 Official. Use Only-Flaring Authorization> I hr. 1. Safety /' ! ~ MCF (P 2. Lease MCF 3. Conserv. Purposes MCF f ~r ~ , w , ~~ ~~ 4a~- Commissio r Date Note; All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition, Authority 20 AAC 25.235. G ~D ~~ v m a ~~ = cu ~ y o (? O rn ti m- c~ 0 3 o° r~l m f--. N 0 0 ~~ ~~ 2/13/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI January-01 .~ Page 1 Unplanned Events less than or equal to 1 hour --- DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 74 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/7/2001 1639-2359 206 VRU down because of coolers hydrating off. Plant left running to keep turbine on-line for life support and pipeline integrity. 1/8/2001 0000-2359 464 VRU down because of coolers hydrating off. Plant left running to keep turbine on-line for life support and pipeline integrity. TOTAL 670 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf _ DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/6/2001 0036-0042 1 Depressuring IGA for maintenance. Replaced leaky o-ring gasket. 1/24/2001 0436-0442 3 Manually blew down 4th Stage to repair gas leak. Repaired gas leak. TOTAL 4 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ---- DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE .ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Volume flared less than 1 hour Volume flared greater than 1 hour Pilot Purge Assist Gas TOTAL FLARED VOLUME TOTAL 78 670 403 0 1,151 ' ;v N ~ O ..t.t _ ~ ' sr~ r-n ~ ~ 0 0 ~'"-' ' ~ m " n o c~ o ~ 0 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Inc. Badami Feb-O1 D N O c~ Disposition Volume MCF* *Indicate contribution of each pool to total, Pool Name ode Percent 60100 Official Use Only-Flaring Authorization>1 hr, 1. Safety MCF 2. Lease MCF 3, Conserv, Purposes MCF Commis oner Date w sn c :~, .w rye. ,,; -~ c- ~: ,:} ;, 0 cn O~ 1, Sold Fuel NGL 0 0 2. Reinjected 410,032 3. Flared or vented less than 1 hour 605 4, Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 364 b. Used for lease operations Assist Fuel 0 40,934 7, Other TOTAL items 1-7 451,935 iv 8 NGL l t d d 0 , gas equ a en pro uce 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby certify ~t~ha~~t the foregoinjjg// is true and Corr {e~ct to the best of my knowledge, Signature C,yl'l./+C._ ~.~GLaL-l/~ Title f (0~ ~ Y-Q~ 'Date I ~t ~ I Note: All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F, Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235, Form 10-422 Rev, 4/95 3/14/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI February-01 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 583 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf BATE' TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/1/2001 1312-1318 2 Depressuring IG-B for maintenance work. None. 2/24/2001 1036-1048 20 Shut down IG-B for repairs. None. TOTAL 22 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TOTAL 0 TOTAL Volume flared less than 1 hour 605 Volume flared greater than 0 1 hour Pilot Purge 364 Assist Gas 0 TOTAL FLARED VOLUME 969 a iv w _o ~ tz~ ~~ ~ n ~ ~ ~o n a ~ 1-P"I ~..e ~ m . tv ,~ o ~ ~ ~ iT B v ' ~ . S CAUSE ..r ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Inc, Badami Mar-Ol Disposition Volume MCF` `Indicate contribution of each pool to total. Pool Name ode Percent 60100 1. Sold Fuel NGL 0 0 2. Reinjected 308,930 3. Flared or vented less than 1 hour 272 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 327 5. Pilot and Purge 403 6. Used for lease operations Assist Fuel 0 44,503 7. Other TOTAL items 1-7 354,435 8. NGL gas equivalent produced 0 9, Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11, Transferred to: I hereby cert~fjy that tf~ foregoing is true and correct to the best of my knowledge, Signature ~~ ~I , ~ ~(~ n/ytx,(A Title r~l G r2'(~14X Date l(~ I ~ ~ 0 Officidl Use Only-Flaring Authorization>1 hr. 1. Safety ~ ~ ~ MCF 2. Lease MCF 3. Conserv. Purposes MCF ,~ ~, ~ ~, , , Commissi er ~ ~ Ib~ Date Note; All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F, Report due by the 20th of the month folowing the month of disposition, Authority 20 AAC 25, 235. ~~~ / Iflf/G7 Z- wt::`' ,_, Form 10-422 Rev. 4/95 4/13/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI March-01 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN'TO ELIMINATE CAUSE TOTAL 259 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/20/2001 0230-0942 96 VRU overhead condenser froze off causing compressor to Placed heater on condenser to thaw out. Restarted shut down. machine. - 3/29/2001 0336-0442 231 Solar Turbine A ESD from low temp on controller causing Started Turbine B and restarted the plant. Also added plant ESD. low temp alarm to turbine to avoid future ESD's from same thing. TOTAL 327 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf .DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION'TAKEN TO ELIMINATE CAUSE 3/26/2001 0948-1000 6 Depressuring IG-B for repair. 3/26/2001 2024-2030 1 Depressuring IG-A for repair. 3/26/2001 2036-2042 2 Depressuring IG-A for repair. 3/26/2001 2100-2106 2 Depressuring IG-A for repair. 3/27/2001 2242-2248 2 Flared due to compressor maintenance. Packing replaced on IG-B recycle valve. TOTAL 13 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL Volume flared less than 1 hour Volume flared greater than 1 hour Pilot Purge Assist Gas TOTAL FLARED VOLUME 0 TOTAL 272 327 403 0 1,002 A ,. Page 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Inc. Badami Apr-Ol Disposition Volume MCF* 1, Sold Fuel NGL 0 0 2. Reinjected 417,158 3. Flared or vented less than 1 hour 52 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 149 5. Pilot and Purge 390 6. Used for lease operations Assist Fuel 0 43,922 7. Other TOTALitems 1-7 461,671 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from; 11, Transferred to: I hereby certify that t e foregoi g is true and correct to the best of my knowledge. Signature Title ~~ ~1. T~k1C Date $~rp~Ot *Indicate contribution of each pool to total. Pool Name ode Percent 60100 OfficialUse Only-Flaring.,Authorization>l hr, 1, Safety l ~~ MCF 2. Lease MCF 3. Conserv. Purposes MCF +lUrV ~~~L r~ / Commissi er `~11~l1G Date Note; All volumes must be corrected to pressure of 14,65 psia and to a ,temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition, Authority 20 AAC 25, 235. ~~„ Form 10-422 Rev. 4/95 5/9/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI April-01 Unplanned Events less than or equal to 1 hour .DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 48 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Jnplanned Events greater than 1 hour ~.. DATE 71ME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/13/2001 1412-1612 99 VRU S/D on 2nd stage suction scrubber HHL. Had trouble Started VRU after draining scrubber, getting Blowcase restarting due to start permissives not resetting properly. to function properly and getting permissives to reset. 4/13/2001 2100-2206 50 VRU S/D on 2nd stage suction scrubber HHL. Had trouble Started VRU after draining scrubber, getting Blowcase restarting due to start permissives not resetting properly. to function properly and getting permissives to reset. TOTAL 149 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/9/2001 1054-1106 4 Bleeding pressure IG-A for repairs None TOTAL 4 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~_~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL Volume flared less than 1 hour 52 Volume flared greater than 149 1 hour Pilot Purge 390 Assist Gas 0 TOTAL FLARED VOLUME 591 • .. Page 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Ex loration (Alaska) Inc, Badami May-O1 Disposition Volume MCF` 1. Sold Fuel NGL 0 0 2. Reinjected 407,662 3. Flared or vented less than 1 hour 218 4, Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 269 5. Pilot and Purge 403 6. Used for lease operations Assist Fuel 0 45,450 7. Other TOTALitems 1-7 454,002 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby certify that the oregoing is true and correct to the best of my knowledge. Signature Title ~~ 2 I ~K Date r'3 d 'Indicate contribution of each pool to total. Pool Name ode Percent 60100 Official Use Only-Flaring Authorization>1 hr. 1. Safety ~ ~ ~~ MCF 2. Lease MCF 3. Conserv. Purposes MCF Commis io er ~. Date Note; All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F, Report due by the 20th of the month folowing the month of disposition, Authority 20 AAC 25.235. ~,~ 3~/F~/OL Form 10-422 Rev. 4/95 6/8/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI May-01 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 196 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/13/2001 1354-1700 269 Turbine shut down. Shut in plant, restarted turbine. TOTAL 269 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF 4NCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/11/2001 1942-2000 22 Shut down A compressor for maintenance. Depressured to Repaired compressor and started back up. flare. TOTAL 22 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL Volume flared less than 1 hour 218 Volume flared greater than 269 1 hour Pilot Purge 403 Assist Gas 0 TOTAL FLARED VOLUME 890 Page 1 , ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Inc. Badami Jun-Ol Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 350,047 3. Flared or vented less than 1 hour 782 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 31 5. Pilot and Purge 390 6. Used for lease operations Assist Fuel 0 39,294 7. Other TOTAL items 1-7 390,544 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby certify that t/hIe foregoing is true and correct to the best of my knowledge. Signature ~ ~, I `.(~ , Title !'~•~--`Mck Date "7 t Z *Indicate contribution of each pool to total. Pool Name ode Percent 60100 Official Use Only.-Flaring Authorization>1 hr. 1. Safety ~ ~ MCF 2. Lease MCF 3. Conserv. Purposes MCF P. ~ l i~ r "I I `~ ~b /v Commis i ner Date Note; All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F, Report due by the 20th of the month folow(ng the month of disposition. Authority 20 AAC 25.235. ~~~~ ~~~ j®'~ Form 10-422 Rev. 4/95 7/10/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI June-01 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME bESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO°ELIMINATE CAUSE TOTAL 782 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour (Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTIQN OF INCIDENT & CAUSE. ACTION TAKEN TO ELIMINATE CAUSE 6/9/2001 1506-1618 31 False signal from PLC caused a plant BESD. Plant depressuring after the BESD. TOTAL 31 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~~ DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL Volume flared less than 1 hour 782 Volume flared greater than 31 1 hour Pilot Purge 390 Assist Gas 0 TOTAL FLARED VOLUME 1,203 Page 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration Alaska Inc. Badami Jul-01 Disposition Volume MCF` 1. Sold Fuel NGL 0 0 2. Reinjected 333,549 3. Flared or vented less than 1 hour 567 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 102 5. Pilot and Purge 403 6. Used for lease operations Assist Fuel 0 38 619 7. Other TOTAL items 1-7 373,240 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: hereby certify that the for going is true and correct to the best of my knowledge. Signature Title l~ij;c Q, T1r.1/k Date ~ /p "Indicate contribution of each pool to total. Pool Name o e Percent 60100 Official Use Only-Flaring Authorization>1 hr. 1. Safety ~~~ MCF 2. Lease MCF 3. Conserv. Purposes MCF n n~ F~, ~~ ~~ r o Y Commissio r Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. .~/i~/o v Form 10-422 Rev. 4/95 8/6/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 GAS FLARING INCIDENT REPORT - BADAMI July-01 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 558 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TfME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/30/2001 1130-1348 102 VRU shut down on low 3rd stage suction pressure. When trying to restart, a pressure switch would not reset, making a start impossible..Replaced malfunctioning pressure switch. TOTAL 102 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf __ - DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE. 7/21/2001 0406-0412 2 Depressure IG-B for maintenance. Depressured compressor to zero psi. 7/28/2001 1348-1354 2 Depressure IG-B for maintenance. Depressured compressor to zero psi. 7/30/2001 1854-1906 5 Depressure IG-B for maintenance. Depressured compressor to zero psi. TOTAL 9 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME pESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL Volume flared less than 1 hour 567 Volume flared greater than 102 1 hour Pilot Purge 403 Assist Gas 0 TOTAL FLARED VOLUME 1,072 M .. Page 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Inc. Badami Au -01 Disposition Volume MCF` 1. Sold Fuel NGL 0 0 2. Reinjected 374,248 3. Flared or vented less than 1 hour 561 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 131 5. Pilot and Purge 377 6. Used for lease operations Assist Fuel 0 38 434 7. Other TOTAL items 1-7 413,751 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby certify that the f egoing is true and correct to the best of my knowledge. Signature Title ~,1,2 T/~11! Date ~~tyle f 'Indicate contribution of each pool to total. Pool Name o e Percent 60100 Official Use Only-Flaring Authorization>1 hr. 1. Safety ~~ MCF 2. Lease MCF 3. Conserv. Purposes MCF n '~'UU ~ ~ n 4`/ Commis ner ~ c; Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. 3~~~D v Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 9/10/2001 GAS FLARING INCIDENT REPORT - BADAMI August-01 Unplanned Events less than or equal to 1 hour - DATE TIME .VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 482 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour A~IA~IIII IIII III II I III ~ IIII ~ ~ II I II I I DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/12/2001 1042-1212 76 Flared due to VRU Comp. S/D on high 1st stg. level. Worked on level switch to dump liquid properly and restarted compressor. 8/29/2001 2106-2212 55 VRU shut down on HH level in 2nd stage suction scrubber. Repaired transmitter to dump liquid properly and restarted compressor. TOTAL 131 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/19/2001 0024-0030 3 Shutting down plant for scheduled maintenance and PSV None recertification. 8/19/2001 0036-0054 8 Shutting down plant for scheduled maintenance and PSV None recertification. 8/19/2001 0136-0142 3 Shutting down plant for scheduled maintenance and PSV None recertification. 8/19/2001 0200-0224 17 Shutting down plant for scheduled maintenance and PSV None recertification. 8/19/2001 0230-0236 3 Shutting down plant for scheduled maintenance and PSV None recertification. 8/19/2001 0306-0324 33 Shutting down plant for scheduled maintenance and PSV None recertification. 8/19/2001 0524-0530 4 Shutting down plant for scheduled maintenance and PSV None recertification. 8/19/2001 0636-0648 8 Shutting down plant for scheduled maintenance and PSV None recertification. TOTAL 79 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL TOTAL Volume flared less than 1 hour 561 Volume flared greater than 131 1 hour Pilot Purge 377 Assist Gas Q TOTAL FLARED VOLUME 1,069 Page 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska Inc. Badami Sep-01 Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 536,483 3. Flared or vented less than 1 hour 257 4. Flared or vented greater than 1 hour (Supplemental report required-•See 20 AAC 25.235) 56 5. Pilot and Purge 390 6. Used for lease operations Assist Fuel 0 44 953 7. Other TOTAL items 1-7 582,139 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby certif r~that the fAregoing is true and correct to the best of my Signature ~ ~. `,'/ . ~ i~~ Title Y-1 V 2-Tftc X Date ~ ~ 0 p e *Indicate contribution of each pool to total. Pool Name o e Percent 60100 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease ~7„ MCF `" ~" 3. Conserv. Purposes MCF ~r ~-d ~ Commissi ,n r ~ it G-~(0 Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 10/9/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - BADAMI September-01 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 257 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour BATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/23/2001 0700-0830 22 Plant start-up after TAPS problems resolved. Adjusted well chokes as needed and started VRU when possible. TOTAL 22 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME ' ' VOLUME DESCRIPTION-0FhNT'& CAUSE ACTION N TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME bESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/23/2001 0000-0145 34 Shut in plant and all production due to TAPS problems. Cooled down TEG system and closed fuel gas to VRU eductor. Vessels slowly depressuring after all wells shut in. TOTAL 34 TOTAL Volume flared less than 1 hour 257 Volume flared greater than 56 1 hour Pilot Purge 390 Assist Gas 0 TOTAL FLARED VOLUME 703 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Ex loration Alaska Inc. Badami Oct-01 Disposition Volume MCF' 1. Sold Fuel NGL 0 0 2. Reinjected 310,090 3. Flared or vented less than 1 hour 1,074 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 144 5. Pilot and Purge 403 6. Used for lease operations Assist Fuel 0 45 676 7. Other TOTAL items 1-7 357,387 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby certi~~fy~~that the foregoing is true and correct to the best of my knowledge. Signature ~~!~.. ~,,(,~f.~, Title ~/~ ~. ~Cc.F'. Date tl 13 d 'Indicate contribution of each pool to total. Pool Name o e Percent 60100 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease 1~t4 MCF 3. Conserv. Purposes MCF n ~~ "~ ~ t :)' Y~ ~, Commission i Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 11/13/2001 GAS FLARING INCIDENT REPORT - BADAMI Page 1 October-01 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF`INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 846 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Eventsigreater than 1 hour DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/1/2001 1024-1048 20 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing 10/1/2001 1236-1248 79 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing 10/1/2001 1936-2000 14 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing 10/1/2001 2024-2030 2 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing 10/1/2001 2130-2142 23 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing 10/1/2001 2242-2254 38 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing 10/2/2001 0448-0454 18 Loading new software into PLC's Requires plant to be shutdown. Vessels slowly flashing off the last of their gas. 10/2/2001 0712-0718 13 Loading new software into PLC's Requires plant to be shutdown. Vessels slowly flashing off the last of their gas. 10/2/2001 0800-0806 10 Loading new software into PLC's Requires plant to be shutdown. Vessels slowly flashing off the last of their gas. 10/2/2001 0842-0848 11 Bringing Plant backup after S/D. Compressor S/D on false H Found bare wires. Fixed and restarted Comp. Temp on 3rd Stg. Discharge TOTAL 228 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ~~. DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN'TO ELIMINATE CAUSE 10/1/2001 1530-1930 144 Doing yearly ESD/BESD Testing None/Yearly/ESD/BESD Testing TOTAL 144 ~~j, ~~ -TOTAL Volume flared less than 1 hour 1,074 Volume flared greater than 144 1 hour Pilot Purge 403 Assist Gas 0 TOTAL FLARED VOLUME 1,621 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration (Alaska) Inc. Badami Nov-01 Disposition Volume MCF' 1. Sold Fuel NGL 0 0 2. Reinjected 584,397 3. Flared or vented less than 1 hour 418 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 390 6. Used for lease operations Assist Fuel 0 45 525 7. Other TOTAL items 1-7 630,730 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby certify that the~foregoing is true and correct to the best of my knowledge. Signature j/,~ j_ ~~(,/ AiY1~1/ ~L Title /y( (s2 TACSC Date *Indicate contribution of each pool to total. Pool Name o e Percent 60100 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. r,,.x `a C"'` ettE Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 12/11/2001 GAS FLARING INCIDENT REPORT - BADAMI Page 1 November-01 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 416 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour ned Events areater than 1 hour TOTAL Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/8/2001 1454-1500 1.2 Shutting down IG-A for maintenance None 11/28/2001 1712-1718 0.4 Bled fuel line from A turbine for safe out None TOTAL 2 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF'NCIDENT & CAUSE ACTION TAKEN'TO ELIMINATE CAUSE TOTAL TOTAL Volume flared less than 1 hour 418 Volume flared greater than 0 1 hour Pilot Purge 390 Assist Gas 0 TOTAL FLARED VOLUME 808 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition Badami BP Exploration Alaska) Inc. Badami Dec-01 Disposition Volume MCF' 'Indicate contribution of each pool to total. Pool Name o e Percent 60100 1. Sold Fuel NGL 0 0 2. Reinjected 511,440 3. Flared or vented less than 1 hour 1,168 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 541 5. Pilot and Purge 403 6. Used for lease operations Assist Fuel 0 52 725 7. Other TOTAL items 1-7 566,277 8. NGL gas equivalent produced 0 9. Purchased gas 0 from Endicott included in above dis ositions 10. Transferred from: 11. Transferred to: I hereby cert~ that the~oregoing is true and correct to the best of my knowledge. Signature r(_ l~ , ~ ~--'t~,~L,(,l Title ~1A.C~2'~Ot x Date 1 ~(D~ 02 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease ~ ~/ MCF 3. Conserv. Purposes MCF Commission Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. 3f ~ z-- Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL NO. 202.4 1/8/2002 GAS FLARING INCIDENT REPORT - BADAMI Page 1 December-01 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 1,130 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/30/2001 0724-0736 5 Shut VRU down for repairs. Repair tube oil pump. 12/30/2001 2018-2100 31 Shut VRU down for repairs. Repair tube oil pump. 12/30/2001 2106-2112 2 Shut VRU down for repairs. Repair tube oil pump. TOTAL 38 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/30/2001 0748-1854 471 Shut VRU down for repairs. Repair tube oil pump. 12!30/2001 2248-0000 28 Shut VRU down for repairs. Repair tube oil pump. 12/30/2001 0000-0148 42 VRU was down for repairs.The crankcase tube oil p ump was After repairs were made to the VRU it was filled with not working. tube oil and restarted and put back in operation. TOTAL 541 TOTAL Volume flared less than 1 hour 1,168 Volume flared greater than 541 1 hour Pilot Purge 403 Assist Gas 0 TOTAL FLARED VOLUME 2,112