FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Inc. Badami Jan-O1
Disposition
Volume MCF'
'Indicate contribution of each pool to total.
Pool Name ode Percent
60100
1. Sold Fuel
NGL 0
0
2. Reinjected 242,430
3. Flared or vented less than 1 hour 78
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 670
5. Pilot and Purge 403
b. Used for lease operations Assist
Fuel 0
32,673
7. Other
TOTAL items 1-7 276,254
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from;
11. Transferred to:
I hereby cert~ that the foregoing is true and correct to the best of my knowledge.
Title INLcsR- T~k Date
Form 10-422
Rev. 4/95
Official. Use Only-Flaring Authorization> I hr.
1. Safety /' ! ~ MCF
(P
2. Lease MCF
3. Conserv. Purposes MCF
f
~r ~ , w , ~~ ~~ 4a~-
Commissio r Date
Note; All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition, Authority 20 AAC
25.235.
G
~D ~~
v
m
a
~~
= cu
~ y
o (?
O
rn ti
m-
c~
0
3
o°
r~l
m
f--.
N
0
0
~~
~~
2/13/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
January-01
.~
Page 1
Unplanned Events less than or equal to 1 hour
---
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 74 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/7/2001 1639-2359 206 VRU down because of coolers hydrating off. Plant left running to keep turbine on-line for life
support and pipeline integrity.
1/8/2001 0000-2359 464 VRU down because of coolers hydrating off. Plant left running to keep turbine on-line for life
support and pipeline integrity.
TOTAL 670
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf _
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/6/2001 0036-0042 1 Depressuring IGA for maintenance. Replaced leaky o-ring gasket.
1/24/2001 0436-0442 3 Manually blew down 4th Stage to repair gas leak. Repaired gas leak.
TOTAL 4
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
----
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE .ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
TOTAL
78
670
403
0
1,151
'
;v
N ~
O
..t.t _
~ '
sr~ r-n
~ ~
0 0 ~'"-'
' ~
m "
n
o c~
o
~
0
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Inc. Badami Feb-O1
D
N
O
c~
Disposition
Volume MCF*
*Indicate contribution of each pool to total,
Pool Name ode Percent
60100
Official Use Only-Flaring Authorization>1 hr,
1. Safety MCF
2. Lease MCF
3, Conserv, Purposes MCF
Commis oner Date
w
sn
c
:~,
.w
rye. ,,;
-~ c-
~:
,:} ;,
0
cn
O~
1, Sold Fuel
NGL 0
0
2. Reinjected 410,032
3. Flared or vented less than 1 hour 605
4, Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 364
b. Used for lease operations Assist
Fuel 0
40,934
7, Other
TOTAL items 1-7 451,935
iv
8
NGL
l
t
d
d 0
,
gas equ
a
en
pro
uce
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby certify ~t~ha~~t the foregoinjjg// is true and Corr {e~ct to the best of my knowledge,
Signature C,yl'l./+C._ ~.~GLaL-l/~ Title f (0~ ~ Y-Q~ 'Date I ~t ~ I
Note: All volumes must be corrected to
pressure of 14,65 psia and to a
temperature of 60 degrees F, Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235,
Form 10-422
Rev, 4/95
3/14/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
February-01
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 583 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
BATE' TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/1/2001 1312-1318 2 Depressuring IG-B for maintenance work. None.
2/24/2001 1036-1048 20 Shut down IG-B for repairs. None.
TOTAL 22
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN
TOTAL 0
TOTAL
Volume flared less than 1 hour 605
Volume flared greater than 0
1 hour
Pilot Purge 364
Assist Gas 0
TOTAL FLARED VOLUME 969
a
iv
w
_o
~
tz~
~~ ~
n ~
~
~o n
a
~ 1-P"I
~..e
~
m . tv ,~
o
~ ~
~
iT
B
v
'
~
.
S
CAUSE
..r
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Inc, Badami Mar-Ol
Disposition
Volume MCF`
`Indicate contribution of each pool to total.
Pool Name ode Percent
60100
1. Sold Fuel
NGL 0
0
2. Reinjected 308,930
3. Flared or vented less than 1 hour 272
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 327
5. Pilot and Purge 403
6. Used for lease operations Assist
Fuel 0
44,503
7. Other
TOTAL items 1-7 354,435
8. NGL gas equivalent produced 0
9, Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11, Transferred to:
I hereby cert~fjy that tf~ foregoing is true and correct to the best of my knowledge,
Signature ~~ ~I , ~ ~(~ n/ytx,(A Title r~l G r2'(~14X Date l(~ I ~ ~ 0
Officidl Use Only-Flaring Authorization>1 hr.
1. Safety ~ ~ ~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
,~ ~, ~ ~, , ,
Commissi er ~ ~ Ib~
Date
Note; All volumes must be corrected to
pressure of 14,65 psia and to a
temperature of 60 degrees F, Report due
by the 20th of the month folowing the
month of disposition, Authority 20 AAC
25, 235.
~~~ /
Iflf/G7 Z-
wt::`'
,_,
Form 10-422
Rev. 4/95
4/13/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
March-01
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN'TO ELIMINATE CAUSE
TOTAL 259 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
3/20/2001 0230-0942 96 VRU overhead condenser froze off causing compressor to Placed heater on condenser to thaw out. Restarted
shut down. machine. -
3/29/2001 0336-0442 231 Solar Turbine A ESD from low temp on controller causing Started Turbine B and restarted the plant. Also added
plant ESD. low temp alarm to turbine to avoid future ESD's from
same thing.
TOTAL 327
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
.DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION'TAKEN TO ELIMINATE CAUSE
3/26/2001 0948-1000 6 Depressuring IG-B for repair.
3/26/2001 2024-2030 1 Depressuring IG-A for repair.
3/26/2001 2036-2042 2 Depressuring IG-A for repair.
3/26/2001 2100-2106 2 Depressuring IG-A for repair.
3/27/2001 2242-2248 2 Flared due to compressor maintenance. Packing replaced on IG-B recycle valve.
TOTAL 13
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
Volume flared less than 1 hour
Volume flared greater than
1 hour
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
0
TOTAL
272
327
403
0
1,002
A ,.
Page 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Inc. Badami Apr-Ol
Disposition
Volume MCF*
1, Sold Fuel
NGL 0
0
2. Reinjected 417,158
3. Flared or vented less than 1 hour 52
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 149
5. Pilot and Purge 390
6. Used for lease operations Assist
Fuel 0
43,922
7. Other
TOTALitems 1-7 461,671
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from;
11, Transferred to:
I hereby certify that t e foregoi g is true and correct to the best of my knowledge.
Signature Title ~~ ~1. T~k1C Date $~rp~Ot
*Indicate contribution of each pool to total.
Pool Name ode Percent
60100
OfficialUse Only-Flaring.,Authorization>l hr,
1, Safety l ~~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
+lUrV ~~~L r~ /
Commissi er `~11~l1G
Date
Note; All volumes must be corrected to
pressure of 14,65 psia and to a
,temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition, Authority 20 AAC
25, 235.
~~„
Form 10-422
Rev. 4/95
5/9/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
April-01
Unplanned Events less than or equal to 1 hour
.DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 48 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Jnplanned Events greater than 1 hour
~..
DATE 71ME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/13/2001 1412-1612 99 VRU S/D on 2nd stage suction scrubber HHL. Had trouble Started VRU after draining scrubber, getting Blowcase
restarting due to start permissives not resetting properly. to function properly and getting permissives to reset.
4/13/2001 2100-2206 50 VRU S/D on 2nd stage suction scrubber HHL. Had trouble Started VRU after draining scrubber, getting Blowcase
restarting due to start permissives not resetting properly. to function properly and getting permissives to reset.
TOTAL 149
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
~~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
4/9/2001 1054-1106 4 Bleeding pressure IG-A for repairs None
TOTAL
4
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
~_~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL
Volume flared less than 1 hour 52
Volume flared greater than 149
1 hour
Pilot Purge 390
Assist Gas 0
TOTAL FLARED VOLUME 591
• ..
Page 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Ex loration (Alaska) Inc, Badami May-O1
Disposition
Volume MCF`
1. Sold Fuel
NGL 0
0
2. Reinjected 407,662
3. Flared or vented less than 1 hour 218
4, Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 269
5. Pilot and Purge 403
6. Used for lease operations Assist
Fuel 0
45,450
7. Other
TOTALitems 1-7 454,002
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby certify that the oregoing is true and correct to the best of my knowledge.
Signature Title ~~ 2 I ~K Date r'3 d
'Indicate contribution of each pool to total.
Pool Name ode Percent
60100
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~ ~ ~~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commis io er ~.
Date
Note; All volumes must be corrected to
pressure of 14,65 psia and to a
temperature of 60 degrees F, Report due
by the 20th of the month folowing the
month of disposition, Authority 20 AAC
25.235.
~,~
3~/F~/OL
Form 10-422
Rev. 4/95
6/8/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
May-01
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 196 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/13/2001 1354-1700 269 Turbine shut down. Shut in plant, restarted turbine.
TOTAL 269
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF 4NCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/11/2001 1942-2000 22 Shut down A compressor for maintenance. Depressured to Repaired compressor and started back up.
flare.
TOTAL 22
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL
Volume flared less than 1 hour 218
Volume flared greater than 269
1 hour
Pilot Purge 403
Assist Gas 0
TOTAL FLARED VOLUME 890
Page 1 ,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Inc. Badami Jun-Ol
Disposition
Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 350,047
3. Flared or vented less than 1 hour 782
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 31
5. Pilot and Purge 390
6. Used for lease operations Assist
Fuel 0
39,294
7. Other
TOTAL items 1-7 390,544
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby certify that t/hIe foregoing is true and correct to the best of my knowledge.
Signature ~ ~, I `.(~ , Title !'~•~--`Mck Date "7 t Z
*Indicate contribution of each pool to total.
Pool Name ode Percent
60100
Official Use Only.-Flaring Authorization>1 hr.
1. Safety ~ ~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
P. ~ l i~ r "I I `~ ~b
/v
Commis i ner Date
Note; All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F, Report due
by the 20th of the month folow(ng the
month of disposition. Authority 20 AAC
25.235.
~~~~
~~~ j®'~
Form 10-422
Rev. 4/95
7/10/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
June-01
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME bESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO°ELIMINATE CAUSE
TOTAL 782 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
(Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTIQN OF INCIDENT & CAUSE. ACTION TAKEN TO ELIMINATE CAUSE
6/9/2001 1506-1618 31 False signal from PLC caused a plant BESD. Plant depressuring after the BESD.
TOTAL 31
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
~~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL
Volume flared less than 1 hour 782
Volume flared greater than 31
1 hour
Pilot Purge 390
Assist Gas 0
TOTAL FLARED VOLUME 1,203
Page 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration Alaska Inc. Badami Jul-01
Disposition
Volume MCF`
1. Sold Fuel
NGL 0
0
2. Reinjected 333,549
3. Flared or vented less than 1 hour 567
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 102
5. Pilot and Purge 403
6. Used for lease operations Assist
Fuel 0
38 619
7. Other
TOTAL items 1-7 373,240
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
hereby certify that the for going is true and correct to the best of my knowledge.
Signature Title l~ij;c Q, T1r.1/k Date ~ /p
"Indicate contribution of each pool to total.
Pool Name o e Percent
60100
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~~~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
n
n~ F~, ~~ ~~ r o Y
Commissio r Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
.~/i~/o v
Form 10-422
Rev. 4/95
8/6/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - BADAMI
July-01
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 558 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TfME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/30/2001 1130-1348 102 VRU shut down on low 3rd stage suction pressure. When trying to restart, a pressure switch would not
reset, making a start impossible..Replaced
malfunctioning pressure switch.
TOTAL 102
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
__ -
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE.
7/21/2001 0406-0412 2 Depressure IG-B for maintenance. Depressured compressor to zero psi.
7/28/2001 1348-1354 2 Depressure IG-B for maintenance. Depressured compressor to zero psi.
7/30/2001 1854-1906 5 Depressure IG-B for maintenance. Depressured compressor to zero psi.
TOTAL 9
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME pESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL
Volume flared less than 1 hour 567
Volume flared greater than 102
1 hour
Pilot Purge 403
Assist Gas 0
TOTAL FLARED VOLUME 1,072
M ..
Page 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Inc. Badami Au -01
Disposition
Volume MCF`
1. Sold Fuel
NGL 0
0
2. Reinjected 374,248
3. Flared or vented less than 1 hour 561
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 131
5. Pilot and Purge 377
6. Used for lease operations Assist
Fuel 0
38 434
7. Other
TOTAL items 1-7 413,751
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby certify that the f egoing is true and correct to the best of my knowledge.
Signature Title ~,1,2 T/~11! Date ~~tyle f
'Indicate contribution of each pool to total.
Pool Name o e Percent
60100
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
n
'~'UU ~ ~ n 4`/
Commis ner
~ c;
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
3~~~D v
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
9/10/2001 GAS FLARING INCIDENT REPORT - BADAMI
August-01
Unplanned Events less than or equal to 1 hour
- DATE TIME .VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 482 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
A~IA~IIII IIII III II I III ~ IIII ~ ~ II I II I I
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/12/2001 1042-1212 76 Flared due to VRU Comp. S/D on high 1st stg. level. Worked on level switch to dump liquid properly and
restarted compressor.
8/29/2001 2106-2212 55 VRU shut down on HH level in 2nd stage suction scrubber. Repaired transmitter to dump liquid properly and
restarted compressor.
TOTAL 131
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/19/2001 0024-0030 3 Shutting down plant for scheduled maintenance and PSV None
recertification.
8/19/2001 0036-0054 8 Shutting down plant for scheduled maintenance and PSV None
recertification.
8/19/2001 0136-0142 3 Shutting down plant for scheduled maintenance and PSV None
recertification.
8/19/2001 0200-0224 17 Shutting down plant for scheduled maintenance and PSV None
recertification.
8/19/2001 0230-0236 3 Shutting down plant for scheduled maintenance and PSV None
recertification.
8/19/2001 0306-0324 33 Shutting down plant for scheduled maintenance and PSV None
recertification.
8/19/2001 0524-0530 4 Shutting down plant for scheduled maintenance and PSV None
recertification.
8/19/2001 0636-0648 8 Shutting down plant for scheduled maintenance and PSV None
recertification.
TOTAL 79
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
TOTAL
Volume flared less than 1 hour 561
Volume flared greater than 131
1 hour
Pilot Purge 377
Assist Gas Q
TOTAL FLARED VOLUME 1,069
Page 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska Inc. Badami Sep-01
Disposition
Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 536,483
3. Flared or vented less than 1 hour 257
4. Flared or vented greater than 1 hour
(Supplemental report required-•See 20 AAC 25.235) 56
5. Pilot and Purge 390
6. Used for lease operations Assist
Fuel 0
44 953
7. Other
TOTAL items 1-7 582,139
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby certif r~that the fAregoing is true and correct to the best of my
Signature ~ ~. `,'/ . ~ i~~ Title Y-1 V 2-Tftc X Date ~ ~ 0 p
e
*Indicate contribution of each pool to total.
Pool Name o e Percent
60100
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease ~7„ MCF
`" ~"
3. Conserv. Purposes MCF
~r ~-d ~
Commissi ,n r ~ it G-~(0
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
10/9/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - BADAMI
September-01
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 257 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
BATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/23/2001 0700-0830 22 Plant start-up after TAPS problems resolved. Adjusted well chokes as needed and started VRU
when possible.
TOTAL 22
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME ' ' VOLUME DESCRIPTION-0FhNT'& CAUSE ACTION N TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME bESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/23/2001 0000-0145 34 Shut in plant and all production due to TAPS problems. Cooled down TEG system and closed fuel gas to VRU
eductor. Vessels slowly depressuring after all wells
shut in.
TOTAL 34
TOTAL
Volume flared less than 1 hour 257
Volume flared greater than 56
1 hour
Pilot Purge 390
Assist Gas 0
TOTAL FLARED VOLUME 703
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Ex loration Alaska Inc. Badami Oct-01
Disposition
Volume MCF'
1. Sold Fuel
NGL 0
0
2. Reinjected 310,090
3. Flared or vented less than 1 hour 1,074
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 144
5. Pilot and Purge 403
6. Used for lease operations Assist
Fuel 0
45 676
7. Other
TOTAL items 1-7 357,387
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby certi~~fy~~that the foregoing is true and correct to the best of my knowledge.
Signature ~~!~.. ~,,(,~f.~, Title ~/~ ~. ~Cc.F'. Date tl 13 d
'Indicate contribution of each pool to total.
Pool Name o e Percent
60100
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease 1~t4 MCF
3. Conserv. Purposes MCF
n
~~ "~ ~ t :)' Y~ ~,
Commission i Date
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
11/13/2001 GAS FLARING INCIDENT REPORT - BADAMI Page 1
October-01
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF`INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 846 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Eventsigreater than 1 hour
DATE TIME VOLUME DESCRIPTION OFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/1/2001 1024-1048 20 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing
10/1/2001 1236-1248 79 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing
10/1/2001 1936-2000 14 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing
10/1/2001 2024-2030 2 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing
10/1/2001 2130-2142 23 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing
10/1/2001 2242-2254 38 Doing yearly ESD/BESD Testing None/Yearly ESD/BESD Testing
10/2/2001 0448-0454 18 Loading new software into PLC's Requires plant to be shutdown. Vessels slowly
flashing off the last of their gas.
10/2/2001 0712-0718 13 Loading new software into PLC's Requires plant to be shutdown. Vessels slowly
flashing off the last of their gas.
10/2/2001 0800-0806 10 Loading new software into PLC's Requires plant to be shutdown. Vessels slowly
flashing off the last of their gas.
10/2/2001 0842-0848 11 Bringing Plant backup after S/D. Compressor S/D on false H Found bare wires. Fixed and restarted Comp.
Temp on 3rd Stg. Discharge
TOTAL 228
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
~~.
DATE TIME VOLUME DESCRIPTION OF INCIDENT& CAUSE ACTION TAKEN'TO ELIMINATE CAUSE
10/1/2001 1530-1930 144 Doing yearly ESD/BESD Testing None/Yearly/ESD/BESD Testing
TOTAL 144 ~~j, ~~
-TOTAL
Volume flared less than 1 hour 1,074
Volume flared greater than 144
1 hour
Pilot Purge 403
Assist Gas 0
TOTAL FLARED VOLUME 1,621
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration (Alaska) Inc. Badami Nov-01
Disposition
Volume MCF'
1. Sold Fuel
NGL 0
0
2. Reinjected 584,397
3. Flared or vented less than 1 hour 418
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 390
6. Used for lease operations Assist
Fuel 0
45 525
7. Other
TOTAL items 1-7 630,730
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby certify that the~foregoing is true and correct to the best of my knowledge.
Signature j/,~ j_ ~~(,/ AiY1~1/ ~L Title /y( (s2 TACSC Date
*Indicate contribution of each pool to total.
Pool Name o e Percent
60100
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
r,,.x
`a
C"'`
ettE
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
12/11/2001 GAS FLARING INCIDENT REPORT - BADAMI Page 1
November-01
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 416 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
ned Events areater than 1 hour
TOTAL
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/8/2001 1454-1500 1.2 Shutting down IG-A for maintenance None
11/28/2001 1712-1718 0.4 Bled fuel line from A turbine for safe out None
TOTAL 2
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF'NCIDENT & CAUSE ACTION TAKEN'TO ELIMINATE CAUSE
TOTAL
TOTAL
Volume flared less than 1 hour 418
Volume flared greater than 0
1 hour
Pilot Purge 390
Assist Gas 0
TOTAL FLARED VOLUME 808
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Badami BP Exploration Alaska) Inc. Badami Dec-01
Disposition
Volume MCF'
'Indicate contribution of each pool to total.
Pool Name o e Percent
60100
1. Sold Fuel
NGL 0
0
2. Reinjected 511,440
3. Flared or vented less than 1 hour 1,168
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 541
5. Pilot and Purge 403
6. Used for lease operations Assist
Fuel 0
52 725
7. Other
TOTAL items 1-7 566,277
8. NGL gas equivalent produced 0
9. Purchased gas 0 from Endicott
included in above dis ositions
10. Transferred from:
11. Transferred to:
I hereby cert~ that the~oregoing is true and correct to the best of my knowledge.
Signature r(_ l~ , ~ ~--'t~,~L,(,l Title ~1A.C~2'~Ot x Date 1 ~(D~ 02
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease ~ ~/ MCF
3. Conserv. Purposes MCF
Commission Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
3f ~ z--
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
1/8/2002 GAS FLARING INCIDENT REPORT - BADAMI Page 1
December-01
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 1,130 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/30/2001 0724-0736 5 Shut VRU down for repairs. Repair tube oil pump.
12/30/2001 2018-2100 31 Shut VRU down for repairs. Repair tube oil pump.
12/30/2001 2106-2112 2 Shut VRU down for repairs. Repair tube oil pump.
TOTAL 38
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/30/2001 0748-1854 471 Shut VRU down for repairs. Repair tube oil pump.
12!30/2001 2248-0000 28 Shut VRU down for repairs. Repair tube oil pump.
12/30/2001 0000-0148 42 VRU was down for repairs.The crankcase tube oil p ump was After repairs were made to the VRU it was filled with
not working. tube oil and restarted and put back in operation.
TOTAL 541
TOTAL
Volume flared less than 1 hour 1,168
Volume flared greater than 541
1 hour
Pilot Purge 403
Assist Gas 0