Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Exploration Alaska) Inc. Eider Jan-Ol
Disposition
Volume MCF*
1. Sold Fuel
NGL 0
0
2. Reinjected 441,872
3. Flared or vented less than 1 hour 171
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 394
6. Used for lease operations Assist
Fuel 903
35,649
7. Other
TOTAL items 1-7 478,989
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that ~e foregoing is true and correct to the best of my knowledge.
Signature ~~,~. ~~~~~~ Title ~~~. TPcX Date
*Indicate contribution of each pool to total.
Pool Name ode Percent
220165
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease /~
!f MCF
d
3. Conserv. Purposes MCF
Commissioner Date
Note; All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
2/6/2001 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1
Jan-2001
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 4,421 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Plan den Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL 0
tOTAI EIDR SDN
Volume flared less than 1 hr 4,421 171 6
Volume flared greater than 0 0 0
1 hr
Pilot Purge 10,199 394 13
Assist Gas 23,342 X03 ~
TOTAL FLARED VOLUME 37,967 1,468 48
ACTION TAKEN TO ELIMINATE CAUSE
.. -,
1~3
ENDICOTT
4,244
0
9,792
36,451
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Ex loration (Alaska Inc. Eider Feb-Ol
Disposition
Volume MCF*
1. Sold Fuel
NGL 0
0
2, Reinjected 316,884
3. Flared or vented less than 1 hour 22
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 280
6. Used for lease operations Assist
Fuel 646
29, 381
7. Other
TOTAL items 1-7 347,213
8. NGL qas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certi at the foregoing is true and correct to the best of my knowledge,
Signature ~ Title Vb~G2, `t-~°rk Date ~ 6fU
'Indicate contribution of each pool to total.
Pool Name o e Percent
220165
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease ~ ~~ MCF
3. Conserv, Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14,65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
,month of disposition, Authority 20 AAC
D
(A
N
0
~~
~N
o~
Q, o
(~ y
CD
y~
O
n
N
O
O
m
IT'i
~''~
1 ~ 1
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
3/6/2001 GAS FLARING INCIDENT REPORT - ENDICOTT
Feb-2001
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 737 DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME
TOTAL 0 DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME
TOTAL 0 DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Planned Events Exceeding 1 Hour OR Exceedin g 5000 Mcf
DATE TIME VOLUME
TOTAL 0 DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL EIDR SDN ENDICOTT
Volume flared less than 1 hr 737 22 0 715
Volume flared greater than 0 0 0 0
1 hr
Pilot Purge 9,212 280 4 8,928
Assist Gas 21.2$2 ~ ~ ~~
T01AL FLARED VOLUME 31,231 948 14 30,269
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Exploration (Alaska) Inc. Eider Mar-Ol
Disposition
Volume MCF'
1. Sold Fuel
NGL 0
0
2. ReinJected 545,235
3. Flared or vented less than 1 hour 228
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 84
5. Pilot and Purge 550
b. Used for lease operations Assist
Fuel 1,252
63,198
7. Other
TOTALitems 1-7 610,547
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify hat the foregoing is true and correct to the best of my knowledge.
Signature Title ~M.(,2 -rAk Date ~
Form 10-422
Rev. 4/95
'Indicate contribution of each pool to total.
Pool Name Code Percent
220165
Official Use Only-Flaring Authorization>1 hr,
1. Safety MCF
2. Lease MCF
3, Conserv. Purposes MCF
Commissioner Date
Note; All volumes must be corrected to
pressure of 14,65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition, Authority 20 AAC
25.235.
-~
~;a
!~""1
E
` ~_.,.
~~
c_-a
~~
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
4/5/2001 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1
Mar-2001
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 4,222 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Full plant shut down and de-pressurization of main gas compression train O-rings on leaking isolation valve changed out and mains
3/22/2001 1720-2050 1555 required to repair leaking isolation valve on 3rd stage started us as soon as possible.
TOTAL 1,555
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL EIDR SDN
Volume flared less than 1 hr 4,222 228 2
Volume flared greater than 1,555 84 1
1 hr
Pilot Purge 10,199 550 5
Assist Gas 23,23 1.252 ~
TOTAL FLARED VOLUME 39,209 2,114 20 ra.
{.,
.3 _
~i
"~y ,
~~
j_,j
h~ '`
TO1
C~~
ENDICOTT
3, 992
1,470
9,644
21,969
37,075
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Exploration Alaska Inc. Eider Apr-Ol
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
Pool Name ode Percent
220165
1. Sold Fuel
NGL 0
0
2, Reinjected 461,876
3, Flared or vented less than 1 hour 217
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 190
5. Pilot and Purge 450
6. Used for lease operations Assist
Fuel 1,027
60,008
7. Other
TOTAL items 1-7 523, 768
8. NGL gas equivalent produced 0
9. Purchased qas
10. Transferred from;
11, Transferred to:
I hereby certify that th foregoing is true and correct to the best of my knowledge,
Signature ~ ~,~' ~ Title IM~GlL71~rk Date d'~ f 0
Official Use Only-Flaring Authorizdtion>1 hr.
1. Safety ~ ~'~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissi er a~'
Date
Note: All volumes must be corrected to
pressure of 14,65 Asia and to a
temperature of 60 degrees F, Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25, 235.
7
~~~
~j
Form 10-422
Rev. 4/95
5/4/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Apr-2001
Page 1
Events less than or equal to 1 hour
-- ---
DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO'ELIMINATE CAUSE
TOTAL 4,760 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION`OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE-
HP fuel gas valve tripped, causing generators to shut in and full plant shut Problem traced to failed 1lnkage arm. Arm replaced and plant
4/9/2001 0740-1120 1041 down. brought back to stable operations ASAP,
HP fuel gas valve tripped, causing generators to shut in and full plant shut Problem traced to failed 1lnkage arm. Arm replaced and plant
4/9/2001 0100-0240 1136 down. brought back to stable operations ASAP.
HP fuel gas valve tripped, causing generators to shut in and full plant shut Problem traced to failed linkage arm, Arm replaced and plant
4/9/2001 0310-0410 451 down, brought back to stable operations ASAP.
B-Main shut down and de-pressurization required to repair leaking PSV on PSV Identified and changed out, B-Main started up as soon as
4/24/2001 0410-0840 1539 2nd stage flare valve opening, possible,
TOTAL 4,167
PIar:Fied Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
Cl'TE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Plan. ied Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL EIDR SDN ENDICOTT
Volume flared less than 1 hr 4,760 217 4 4,539
Volume flared greater than 4,167 190 3 3,974
1 hr
Pilot Purge 9,870 450 7 9,413
Assist Gas 22'509 1 `027 ~ 21,465
TOTAL FLARED VOLUME 41,306 1,884 31 39,391
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Exploration Alaska Inc. Eider May-Ol
Disposition
Volume MCF"`
1. Sold Fuel
NGL 0
0
2. Reinjected 158,747
3. Flared or vented less than 1 hour 17
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 48
5. Pilot and Purge 207
b. Used for lease operations Assist
Fuel 470
58 937
7. Other
TOTAL items 1-7 218,426
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify threat t foregoing i true and correct to the best of my knowledge.
Signature ~. L.(', Title /~W 2 -t~rh Date ~,/~/~~
'Indicate contribution of each pool to total.
Pool Name Code Percent
220165
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~ ~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
n ~-~
Commis ner
Date
Note; All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
~5~/~~GY
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
6/6/2001 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1
May-2001
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 835 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5/2/2001 0830-0930 95 B Maln Gas Compressor shut down for scheduled maintenance work. Well set optimized ASAP to mitigate flaring.
Wells Immediately shut in to prevent excess flaring.
Failure of thermocouples on A Main Gas Compressor caused S/D on Thermocouples were replaced, compressor restarted, and
5/3/2001 0930-1150 468 temperature deviation. plant brough back to stable operations ASAP.
Wells immediately shut in to prevent excess Haring.
Failure of thermocouples on A Maln Gas Compressor caused S/D on Thermocouples were replaced, compressor restarted, and
5/3/2001 1220-1340 84 temperature deviation. plant brough back to stable operations ASAP.
5/10/2001 0250-0440 1703 B Main re-start caused upsets throughout the plant. B Main brought back on-fine and plant stabilized ASAP.
TOTAL 2,350
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL EIDR SDN ENDICOTT
Volume flared less than 1 hr 835 17 1 817
Volume flared greater than 2,350 48 2 2,300
1 hr
Pilot Purge 10,199 207 8 9,984
Assist Gas 23.165 4Z0 ~ 22,677
TOTAL FLARED VOLUME 36,549 742 29 35,778
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Exploration (Alaska) Inc. Eider Jun-Ol
Disposition
Volume MCF"
1. Sold Fuel
NGL 0
0
2. Reinjected 534,321
3. Flared or vented less than 1 hour 84
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 17
5. Pilot and Purge 529
b. Used for lease operations Assist
Fuel 1,288
69,382
7. Other
TOTAL items 1-7 605,621
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to;
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature YC.U. ~n~ Title wLC,tL_. -t"pcS~ Date {-Z
'Indicate contribution of each pool to total.
Pool Name ode Percent
220165
Official Use Only-Flaring Authorization>T hr.
1. Safety j ~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
~~ ~~~r~~~ ~Ze~oy
Commissi er ~L~ Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
~~
~~~~oL
Form 10-422
Rev. 4/95
- . ~ -
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4 Page 1
7/16/2001 GAS FLARING INCIDENT REPORT - ENDICOTT
Jun-2001
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 1,562 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Gas turbine 4502 went down due to two failed exhaust thermocouples. Wells immediately shut in to prevent excess flaring. Thermocouples
6/5/2001 0640-0940 185 Plant was load shedded until diesel generators brought up. were replaced and plant brought back to stable operations ASAP,
Emergency generator started to lighten load on power turbines,
Load shed due to power generation loss because of high ambient Power generation operating procedure updated. 3rd power
6/12/2001 1050-1230 62 temperatures. generator run during summertime to reduce load per generator.
Emergency generator started to lighten load on power turbines.
Load shed due to power generation loss because of high ambient Power generation operating procedure updated. 3rd power
6/12/2001 1340-1530 69 temperatures. generator run during summertime to reduce load per generator,
TOTAL 316
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL EIDR SDN ENDICOTT
Volume flared less than 1 hr 1,562 84 0 1,478
Volume flared greater than 316 17 0 299
1 hr
Pilot Purge 9,870 529 3 9,338
Assist Gas 24.041 1,28$ fi 22,747
TOTAL FLARED VOLUME 35,789 1,918 9 33,862
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Exploration Alaska) Inc. Eider Jul-01
Disposition
Volume MCF'
1. Sold Fuel
NGL 0
0
2. Reinjected 623,971
3. Flared or vented less than 1 hour 252
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 103
5. Pilot and Purge 637
6. Used for lease operations Assist
Fuel 1,563
70 776
7. Other
TOTAL items 1-7 697,302
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certi that the f egoing is true and correct to the best of my knowledge.
Signature ~~~ Title ~~.'C~)C Date ~(pjUl__
'Indicate contribution of each pool to total.
Pool Name o e Percent
220165
Official'Use Only-Flaring Authorization>1 hr.
1. Safety 0 ~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
~: o y
Commissi er Date
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
v ~ ~
Form 10-422
Rev. 4/95
8/3/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Jul-2001
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 4,030 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
07/02/01 21:50-23:10 239 B-Booster S/D on high discharge temperatures. Booster brought back online ASAP.
MI 2nd stage cooling exhaust louvers examined and adjusted.
07/20/01 17:40-18:40 328 MI S/D on high 2nd stage discharge temperature. MI restart attempted. Compressor brought back to stable operations.
Well set quickly optimized to mitigate flaring. Water pump repaired and
07/20/01 22:00-23:00 125 P1907 water pump S/D due to high temperature alarm. brought back online ASAP.
Repairs made to propane compressor controls as quickly as possible.
07/21/01 00:00-07:50 426 Propane compressor went down on a controls error, lost MI shortly after. MI brought back online ASAP.
Well set quickly optimized to mitigate flaring. Water pump repaired and
07/21/01 18:10-00:00 418 P1802 water pump S/D due to high temperature alarm. brought back online ASAP.
07/23/01 14:00-15:00 117 B Booster motor breaker tripped on high winding temperatures. Booster breaker re-set, brought back online ASAP.
TOTAL 1,653
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
neTF TineF vo~uME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME `pESCRIPTION OF=INCIDENT & CAUSE ACTION TAKEN TO°ELIMINATE CAUSE
TOTAL 0
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
TOTAL EIDR SDN ENDICOTT
4,030 252 2 3,776
1,653 103 1 1,549
10,199 637 5 9,557
25.03$ 1.563 11 23.464
40,920 2,555 19 38,346
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Ex loration (Alaska Inc. Eider Au -01
Disposition
Volume MCF'
1. Sold Fuel
NGL 0
0
2. Reinjected 576,016
3. Flared or vented less than 1 hour 175
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 8
5. Pilot and Purge 566
6. Used for lease operations Assist
Fuel 1,298
66 491
7. Other
TOTAL items 1-7 644,554
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
true and correct to the best of my
Title !til ~~ CLTF~k Date
`Indicate contribution of each pool to total.
Pool Name o e Percent
220165
Official Use Only-Flaring Authorization>1 hr,
1. Safety ~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
'~wv ~ ~1
Commissi er '~ a~
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
mil/ ~ ~v
~/> ~/
Form 10-422
Rev. 4/95
9/6/2001 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Aug-2001
Unplanned Events less than or equal to 1 hour
.... ~,
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 3,156 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Controls proceedure reviewed with board operators to better handle flare
08/04/01 09:40-12:00 10 Assist gas added for opacity control during A-Main water wash. usage during sporadic upset events.
Well set optimized to mitigate flaring. B Main brought back on-line and
08/05/01 02:50-04:40 48 B Main re-start caused upsets throughout the plant. plant stabilized ASAP.
Controls proceedure reviewed with board operators to better handle flare
08/08/01 13:40-14:40 7 Assist gas added for opacity control during B-Main water wash. usage during sporadic upset events.
Assist gas for opacity reduction while running propane copus during multiple
08/17/01 16:50-18:50 50 start attempts. Propane compressor brought back on-line ASAP.
TOTAL 115
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE.
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
,~ ..
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
17.5 miles of the Badami 6" utility line was decommissioned and bled down
08/24/01 12:00-15:15 36 through a portable flare.
TOTAL 36
TOTAL EIDR SDN ENDICOTT
Volume flared less than i hr 3,156 175 2 2,979
Volume flared greater than 151 8 0 143
1 hr
Pilot Purge 10,199 566 5 9,628
Assist Gas 23.386 ]~98 ],~ 22.076
TOTAL FLARED VOLUME 36,892 2,047 19 34,826
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Exploration (Alaska Inc. Eider Sep-01
Disposition
Volume MCF'
1. Sold Fuel
NGL 0
0
2. Reinjected 492,774
3. Flared or vented less than 1 hour 97
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 14
5. Pilot and Purge 476
6. Used for lease operations Assist
Fuel 1,054
60 441
7. Other
TOTAL items 1-7 554,856
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Title I'kb 2. T~43C Date ~ p
"Indicate contribution of each pool to total.
Pool Name o e Percent
220165
Official Use Only-Flaring Authorization>1 hr'.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
~r ~~ :1`; ~ i
" ~~ 6,, , .. , tip
Commis g er 41 u .
~? 7` ~J
Date
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
10/4/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Sep-2001
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ~ ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 2,010 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/22/2001 1420-1520 77 Plant upsets during TAPS proration. Well set optimized ASAP to mitigate flaring.
Low gas flow rate during 10% TAPS proration caused booster compressor to go
to high recycle. Flare valve manually opened to maintain temperatures and Highest GOR wells flowed into plant. Flare valve manually set to mitigate
9!23/2001 0220-0700 124 keep gas compressor running. flaring while gas compressor monitored to avoid high temperature S/D.
9/23/2001 0810-0920 91 Upsets during B-Main restart attempt after TAPS proration ended. Well set optimized ASAP to mitigate flaring.
TOTAL 292
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME "DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE'
TOTAL 0
TOTAL EIDR SDN ENDICOTT
Volume flared less than 1 hr 2,010 97 1 1,912
Volume dared greater than 292 14 0 278
1 hr
Pilot Purge 9,870 476 7 9,387
Assist Gas 21.866 1.054 ~ 20.797
TOTAL FLARED VOLUME 34,038 1,641 23 32,374
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Ex loration (Alaska) Inc. Eider Oct-01
Disposition
Volume MCF'
1. Sold Fuel
NGL 0
0
2. Reinjected 525,118
3. Flared or vented less than 1 hour 49
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 35
5. Pilot and Purge 503
6. Used for lease operations Assist
Fuel 1,149
66 715
7. Other
TOTAL items 1-7 593,569
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certi~fy~t~hat the foregoing is true and correct to the best of my knowledge.
Signature /!IiYU1-c- ~~1 Title ~D ~ ~~GC.~'. Date 1~ 7 Q ~
*Indicate contribution of each pool to total.
Pool Name o e Percent
220165
Official Use Only-Flaring Authorization>1 hr.
1. Safety 2~, 7 MCF
2. Lease IZ 3 MCF
3. Conserv. Purposes MCF
Commissio r r Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowjng the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
11/6/2001 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Oct-2001
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF1NCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 1,003 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OFiNCIDENF& CAUSE ACTION TAKEN TO ELIMINATE CAUSE
5% proration during TAPS bullet hole repair caused plant instability which led to Booster compressor restarted as quickly as possible and plant stabilized
10/6/2001 0840-1710 209 booster compressor shut down and flaring. Assist gas used for opacity control. for low flow rates.
NGL startup overloaded the booster compressor and caused flaring. Assist gas
10/7/2001 1320-1510 40 used for opacity control. NGL system restarted as quickly as possible, plant stabilized.
NGL stabilizer relief valve opened to flare causing a black smoke problem.
10/9/2001 1020-1650 316 Assist gas was used to keep under opacity minimums. Failed relief valve was identified and corrected as quickly as possible.
Propane shut down due to leak discovered on TEG cooler. MI shut down shortly TEG cooler leak identified and fixed, propane and MI restarted and plant
10/16/2001 0840-1040 144 after. stabilized out.
TOTAL 709
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'-'ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTIONTAKEN'TO ELIMINATE CAUSE
TOTAL 0
~9-f'y0 35'~~"0~ CSJ~~
Volume flared less than 1 hr TOTAL
003
1 EIDR
49
~Q.Ct ~1~ SDN
1 ENDICOTT
953
, 7C~~
Volume flared greater than 709 35 0 674
1 hr
31(0 + 141'
= b4.88°7o
C5 ~ Cep
Pilot Purge 10,199 503 6 9,690
(~
7
- ` ~ J
~
Assist Gas 23.275 1.149 ~ 22.113
Eider' t2.3 2.2. ~
TOTAL FLARED VOLUME 35,186 1,736 , u Na~ 20 33,430
~ Q
C-~,IC°~' 236.7 ~3~~3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Exploration (Alaska Inc. Eider Nov-Ot
Disposition
Volume MCF'
1. Sold Fuel
NGL 0
0
2. Reinjected 537,721
3. Flared or vented less than 1 hour 60
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 8
5. Pilot and Purge 468
6. Used for lease operations Assist
Fuel 1,070
60 845
7. Other
TOTAL items 1-7 600,172
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify((th~~at t e foregoing is true and correct to the best of my knowledge.
Signature ~.1:(. Title Vl/tG~- T~k' Date -Z 4
`Indicate contribution of each pool to total.
Pool Name o e Percent
220165
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease ~~ MCF
3. Conserv. Purposes MCF
Commissi er ~ Date
~- I~-cur- 31~ ~~OZ
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
~:
~_ cr
~~
iea
'~ ~
^ =~.
4
~F
C:~
c .,
_...~
k~L~'
z
Form 10-422
Rev. 4/95
12/5/2001
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Nov-2001
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE. ACTION'TAKEN TO ELIMINATE CAUSE
TOTAL 1,272 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Multiple A-Main gas compressor I&E failures caused full field S/D. With the gas
booster down, the low pressure gasses route to flare. Assist gas used for A-MCC and gas booster brought back on-line ASAP, and plant stabilized
11/30/2001 1300-1430 167 opacity control to mitigate flaring.
TOTAL 167
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL EIDR SDN ENDICOTT
Volume flared less than 1 hr 1,272 60 1 1,211
Volume flared greater than 167 8 0 159
1 hr
Pilot Purge 9,870 468 7 9,395
Assist Gas 22.`2.22 1.070 ~ ~~
TOTAL FLARED VOLUME 33,861 1,606 24 32,231
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Endicott 10450 Month/Year of Disposition
Endicott BP Ex loration (Alaska Inc. Eider Dec-01
Disposition
Volume MCF'
1. Sold Fuel
NGL 0
0
2. Reinjected 557,268
3. Flared or vented less than 1 hour 146
4. Flared or vented greater than 1 hour
(Supplemental report required-•See 20 AAC 25.235) 1
5. Pilot and Purge 484
6. Used for lease operations Assist
Fuel 1,099
59 690
7. Other
TOTAL items 1-7 618,688
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
true and correct to the best of my knowledge.
Title M (J2 Tt'r 1r Date
'Indicate contribution of each pool to total.
Pool Name o e Percent
220165
Official Use Only-Flaring Authorization>1 h~,
1. Safety / MCF
C
2. Lease MCF
3. Conserv. Purposes MCF
' ~lS~oY
Commission Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
Form 10-422
Rev. 4/95
1/4/2002 BP EXPLORATION (ALASKA) INC. Page 1
ADMINISTRATIVE APPROVAL N0.202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Dec-2001
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 3,079 Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Both gas compressors shut down, causing full field S/D. MI restart attempted, MI compressor brought to stable operations ASAP, cause of main gas
12/4/2001 1140-1250 31 causing flaring and plant upset. compressor S/D's being investigated.
TOTAL 31
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceedin g 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
TOTAL EIDR SDN ENDICOTT
Volume flared less than 1 hr 3,079 146 3 2,930
Volume flared greater than 31 1 0 30
1 hr
Pilot Purge 10,199 484 10 9,705
Assist Gas 23.139 ~$ ~ ~$
TOTAL FLARED VOLUME 36,448 1,730 35 34,683