Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBPXA - EIDERALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Exploration Alaska) Inc. Eider Jan-Ol Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2. Reinjected 441,872 3. Flared or vented less than 1 hour 171 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 394 6. Used for lease operations Assist Fuel 903 35,649 7. Other TOTAL items 1-7 478,989 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that ~e foregoing is true and correct to the best of my knowledge. Signature ~~,~. ~~~~~~ Title ~~~. TPcX Date *Indicate contribution of each pool to total. Pool Name ode Percent 220165 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease /~ !f MCF d 3. Conserv. Purposes MCF Commissioner Date Note; All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 2/6/2001 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1 Jan-2001 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 4,421 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Plan den Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE TOTAL 0 tOTAI EIDR SDN Volume flared less than 1 hr 4,421 171 6 Volume flared greater than 0 0 0 1 hr Pilot Purge 10,199 394 13 Assist Gas 23,342 X03 ~ TOTAL FLARED VOLUME 37,967 1,468 48 ACTION TAKEN TO ELIMINATE CAUSE .. -, 1~3 ENDICOTT 4,244 0 9,792 36,451 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Ex loration (Alaska Inc. Eider Feb-Ol Disposition Volume MCF* 1. Sold Fuel NGL 0 0 2, Reinjected 316,884 3. Flared or vented less than 1 hour 22 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 0 5. Pilot and Purge 280 6. Used for lease operations Assist Fuel 646 29, 381 7. Other TOTAL items 1-7 347,213 8. NGL qas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certi at the foregoing is true and correct to the best of my knowledge, Signature ~ Title Vb~G2, `t-~°rk Date ~ 6fU 'Indicate contribution of each pool to total. Pool Name o e Percent 220165 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease ~ ~~ MCF 3. Conserv, Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the ,month of disposition, Authority 20 AAC D (A N 0 ~~ ~N o~ Q, o (~ y CD y~ O n N O O m IT'i ~''~ 1 ~ 1 Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 3/6/2001 GAS FLARING INCIDENT REPORT - ENDICOTT Feb-2001 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME TOTAL 737 DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME TOTAL 0 DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME TOTAL 0 DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Planned Events Exceeding 1 Hour OR Exceedin g 5000 Mcf DATE TIME VOLUME TOTAL 0 DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL EIDR SDN ENDICOTT Volume flared less than 1 hr 737 22 0 715 Volume flared greater than 0 0 0 0 1 hr Pilot Purge 9,212 280 4 8,928 Assist Gas 21.2$2 ~ ~ ~~ T01AL FLARED VOLUME 31,231 948 14 30,269 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Exploration (Alaska) Inc. Eider Mar-Ol Disposition Volume MCF' 1. Sold Fuel NGL 0 0 2. ReinJected 545,235 3. Flared or vented less than 1 hour 228 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 84 5. Pilot and Purge 550 b. Used for lease operations Assist Fuel 1,252 63,198 7. Other TOTALitems 1-7 610,547 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify hat the foregoing is true and correct to the best of my knowledge. Signature Title ~M.(,2 -rAk Date ~ Form 10-422 Rev. 4/95 'Indicate contribution of each pool to total. Pool Name Code Percent 220165 Official Use Only-Flaring Authorization>1 hr, 1. Safety MCF 2. Lease MCF 3, Conserv. Purposes MCF Commissioner Date Note; All volumes must be corrected to pressure of 14,65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition, Authority 20 AAC 25.235. -~ ~;a !~""1 E ` ~_.,. ~~ c_-a ~~ BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 4/5/2001 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1 Mar-2001 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 4,222 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Full plant shut down and de-pressurization of main gas compression train O-rings on leaking isolation valve changed out and mains 3/22/2001 1720-2050 1555 required to repair leaking isolation valve on 3rd stage started us as soon as possible. TOTAL 1,555 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN Volume flared less than 1 hr 4,222 228 2 Volume flared greater than 1,555 84 1 1 hr Pilot Purge 10,199 550 5 Assist Gas 23,23 1.252 ~ TOTAL FLARED VOLUME 39,209 2,114 20 ra. {., .3 _ ~i "~y , ~~ j_,j h~ '` TO1 C~~ ENDICOTT 3, 992 1,470 9,644 21,969 37,075 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Exploration Alaska Inc. Eider Apr-Ol Disposition Volume MCF* *Indicate contribution of each pool to total. Pool Name ode Percent 220165 1. Sold Fuel NGL 0 0 2, Reinjected 461,876 3, Flared or vented less than 1 hour 217 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 190 5. Pilot and Purge 450 6. Used for lease operations Assist Fuel 1,027 60,008 7. Other TOTAL items 1-7 523, 768 8. NGL gas equivalent produced 0 9. Purchased qas 10. Transferred from; 11, Transferred to: I hereby certify that th foregoing is true and correct to the best of my knowledge, Signature ~ ~,~' ~ Title IM~GlL71~rk Date d'~ f 0 Official Use Only-Flaring Authorizdtion>1 hr. 1. Safety ~ ~'~ MCF 2. Lease MCF 3. Conserv. Purposes MCF Commissi er a~' Date Note: All volumes must be corrected to pressure of 14,65 Asia and to a temperature of 60 degrees F, Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25, 235. 7 ~~~ ~j Form 10-422 Rev. 4/95 5/4/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Apr-2001 Page 1 Events less than or equal to 1 hour -- --- DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO'ELIMINATE CAUSE TOTAL 4,760 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION`OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE- HP fuel gas valve tripped, causing generators to shut in and full plant shut Problem traced to failed 1lnkage arm. Arm replaced and plant 4/9/2001 0740-1120 1041 down. brought back to stable operations ASAP, HP fuel gas valve tripped, causing generators to shut in and full plant shut Problem traced to failed 1lnkage arm. Arm replaced and plant 4/9/2001 0100-0240 1136 down. brought back to stable operations ASAP. HP fuel gas valve tripped, causing generators to shut in and full plant shut Problem traced to failed linkage arm, Arm replaced and plant 4/9/2001 0310-0410 451 down, brought back to stable operations ASAP. B-Main shut down and de-pressurization required to repair leaking PSV on PSV Identified and changed out, B-Main started up as soon as 4/24/2001 0410-0840 1539 2nd stage flare valve opening, possible, TOTAL 4,167 PIar:Fied Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf Cl'TE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Plan. ied Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT &CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared less than 1 hr 4,760 217 4 4,539 Volume flared greater than 4,167 190 3 3,974 1 hr Pilot Purge 9,870 450 7 9,413 Assist Gas 22'509 1 `027 ~ 21,465 TOTAL FLARED VOLUME 41,306 1,884 31 39,391 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Exploration Alaska Inc. Eider May-Ol Disposition Volume MCF"` 1. Sold Fuel NGL 0 0 2. Reinjected 158,747 3. Flared or vented less than 1 hour 17 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 48 5. Pilot and Purge 207 b. Used for lease operations Assist Fuel 470 58 937 7. Other TOTAL items 1-7 218,426 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify threat t foregoing i true and correct to the best of my knowledge. Signature ~. L.(', Title /~W 2 -t~rh Date ~,/~/~~ 'Indicate contribution of each pool to total. Pool Name Code Percent 220165 Official Use Only-Flaring Authorization>1 hr. 1. Safety ~ ~ MCF 2. Lease MCF 3. Conserv. Purposes MCF n ~-~ Commis ner Date Note; All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. ~5~/~~GY Form 10-422 Rev. 4/95 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 6/6/2001 GAS FLARING INCIDENT REPORT - ENDICOTT Page 1 May-2001 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 835 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/2/2001 0830-0930 95 B Maln Gas Compressor shut down for scheduled maintenance work. Well set optimized ASAP to mitigate flaring. Wells Immediately shut in to prevent excess flaring. Failure of thermocouples on A Main Gas Compressor caused S/D on Thermocouples were replaced, compressor restarted, and 5/3/2001 0930-1150 468 temperature deviation. plant brough back to stable operations ASAP. Wells immediately shut in to prevent excess Haring. Failure of thermocouples on A Maln Gas Compressor caused S/D on Thermocouples were replaced, compressor restarted, and 5/3/2001 1220-1340 84 temperature deviation. plant brough back to stable operations ASAP. 5/10/2001 0250-0440 1703 B Main re-start caused upsets throughout the plant. B Main brought back on-fine and plant stabilized ASAP. TOTAL 2,350 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared less than 1 hr 835 17 1 817 Volume flared greater than 2,350 48 2 2,300 1 hr Pilot Purge 10,199 207 8 9,984 Assist Gas 23.165 4Z0 ~ 22,677 TOTAL FLARED VOLUME 36,549 742 29 35,778 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Exploration (Alaska) Inc. Eider Jun-Ol Disposition Volume MCF" 1. Sold Fuel NGL 0 0 2. Reinjected 534,321 3. Flared or vented less than 1 hour 84 4. Flared or vented greater than 1 hour (Supplemental report required-See 20 AAC 25.235) 17 5. Pilot and Purge 529 b. Used for lease operations Assist Fuel 1,288 69,382 7. Other TOTAL items 1-7 605,621 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to; I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature YC.U. ~n~ Title wLC,tL_. -t"pcS~ Date {-Z 'Indicate contribution of each pool to total. Pool Name ode Percent 220165 Official Use Only-Flaring Authorization>T hr. 1. Safety j ~ MCF 2. Lease MCF 3. Conserv. Purposes MCF ~~ ~~~r~~~ ~Ze~oy Commissi er ~L~ Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. ~~ ~~~~oL Form 10-422 Rev. 4/95 - . ~ - BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 Page 1 7/16/2001 GAS FLARING INCIDENT REPORT - ENDICOTT Jun-2001 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 1,562 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Gas turbine 4502 went down due to two failed exhaust thermocouples. Wells immediately shut in to prevent excess flaring. Thermocouples 6/5/2001 0640-0940 185 Plant was load shedded until diesel generators brought up. were replaced and plant brought back to stable operations ASAP, Emergency generator started to lighten load on power turbines, Load shed due to power generation loss because of high ambient Power generation operating procedure updated. 3rd power 6/12/2001 1050-1230 62 temperatures. generator run during summertime to reduce load per generator. Emergency generator started to lighten load on power turbines. Load shed due to power generation loss because of high ambient Power generation operating procedure updated. 3rd power 6/12/2001 1340-1530 69 temperatures. generator run during summertime to reduce load per generator, TOTAL 316 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared less than 1 hr 1,562 84 0 1,478 Volume flared greater than 316 17 0 299 1 hr Pilot Purge 9,870 529 3 9,338 Assist Gas 24.041 1,28$ fi 22,747 TOTAL FLARED VOLUME 35,789 1,918 9 33,862 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Exploration Alaska) Inc. Eider Jul-01 Disposition Volume MCF' 1. Sold Fuel NGL 0 0 2. Reinjected 623,971 3. Flared or vented less than 1 hour 252 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 103 5. Pilot and Purge 637 6. Used for lease operations Assist Fuel 1,563 70 776 7. Other TOTAL items 1-7 697,302 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certi that the f egoing is true and correct to the best of my knowledge. Signature ~~~ Title ~~.'C~)C Date ~(pjUl__ 'Indicate contribution of each pool to total. Pool Name o e Percent 220165 Official'Use Only-Flaring Authorization>1 hr. 1. Safety 0 ~ MCF 2. Lease MCF 3. Conserv. Purposes MCF ~: o y Commissi er Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. v ~ ~ Form 10-422 Rev. 4/95 8/3/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Jul-2001 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 4,030 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 07/02/01 21:50-23:10 239 B-Booster S/D on high discharge temperatures. Booster brought back online ASAP. MI 2nd stage cooling exhaust louvers examined and adjusted. 07/20/01 17:40-18:40 328 MI S/D on high 2nd stage discharge temperature. MI restart attempted. Compressor brought back to stable operations. Well set quickly optimized to mitigate flaring. Water pump repaired and 07/20/01 22:00-23:00 125 P1907 water pump S/D due to high temperature alarm. brought back online ASAP. Repairs made to propane compressor controls as quickly as possible. 07/21/01 00:00-07:50 426 Propane compressor went down on a controls error, lost MI shortly after. MI brought back online ASAP. Well set quickly optimized to mitigate flaring. Water pump repaired and 07/21/01 18:10-00:00 418 P1802 water pump S/D due to high temperature alarm. brought back online ASAP. 07/23/01 14:00-15:00 117 B Booster motor breaker tripped on high winding temperatures. Booster breaker re-set, brought back online ASAP. TOTAL 1,653 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf neTF TineF vo~uME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME `pESCRIPTION OF=INCIDENT & CAUSE ACTION TAKEN TO°ELIMINATE CAUSE TOTAL 0 Volume flared less than 1 hr Volume flared greater than 1 hr Pilot Purge Assist Gas TOTAL FLARED VOLUME TOTAL EIDR SDN ENDICOTT 4,030 252 2 3,776 1,653 103 1 1,549 10,199 637 5 9,557 25.03$ 1.563 11 23.464 40,920 2,555 19 38,346 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Ex loration (Alaska Inc. Eider Au -01 Disposition Volume MCF' 1. Sold Fuel NGL 0 0 2. Reinjected 576,016 3. Flared or vented less than 1 hour 175 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 8 5. Pilot and Purge 566 6. Used for lease operations Assist Fuel 1,298 66 491 7. Other TOTAL items 1-7 644,554 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: true and correct to the best of my Title !til ~~ CLTF~k Date `Indicate contribution of each pool to total. Pool Name o e Percent 220165 Official Use Only-Flaring Authorization>1 hr, 1. Safety ~ MCF 2. Lease MCF 3. Conserv. Purposes MCF '~wv ~ ~1 Commissi er '~ a~ Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. mil/ ~ ~v ~/> ~/ Form 10-422 Rev. 4/95 9/6/2001 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Aug-2001 Unplanned Events less than or equal to 1 hour .... ~, DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 3,156 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Controls proceedure reviewed with board operators to better handle flare 08/04/01 09:40-12:00 10 Assist gas added for opacity control during A-Main water wash. usage during sporadic upset events. Well set optimized to mitigate flaring. B Main brought back on-line and 08/05/01 02:50-04:40 48 B Main re-start caused upsets throughout the plant. plant stabilized ASAP. Controls proceedure reviewed with board operators to better handle flare 08/08/01 13:40-14:40 7 Assist gas added for opacity control during B-Main water wash. usage during sporadic upset events. Assist gas for opacity reduction while running propane copus during multiple 08/17/01 16:50-18:50 50 start attempts. Propane compressor brought back on-line ASAP. TOTAL 115 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE. TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf ,~ .. DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 17.5 miles of the Badami 6" utility line was decommissioned and bled down 08/24/01 12:00-15:15 36 through a portable flare. TOTAL 36 TOTAL EIDR SDN ENDICOTT Volume flared less than i hr 3,156 175 2 2,979 Volume flared greater than 151 8 0 143 1 hr Pilot Purge 10,199 566 5 9,628 Assist Gas 23.386 ]~98 ],~ 22.076 TOTAL FLARED VOLUME 36,892 2,047 19 34,826 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Exploration (Alaska Inc. Eider Sep-01 Disposition Volume MCF' 1. Sold Fuel NGL 0 0 2. Reinjected 492,774 3. Flared or vented less than 1 hour 97 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 14 5. Pilot and Purge 476 6. Used for lease operations Assist Fuel 1,054 60 441 7. Other TOTAL items 1-7 554,856 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify that the foregoing is true and correct to the best of my knowledge. Title I'kb 2. T~43C Date ~ p "Indicate contribution of each pool to total. Pool Name o e Percent 220165 Official Use Only-Flaring Authorization>1 hr'. 1. Safety MCF 2. Lease MCF 3. Conserv. Purposes MCF ~r ~~ :1`; ~ i " ~~ 6,, , .. , tip Commis g er 41 u . ~? 7` ~J Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 10/4/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Sep-2001 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ~ ACTION TAKEN TO ELIMINATE CAUSE TOTAL 2,010 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/22/2001 1420-1520 77 Plant upsets during TAPS proration. Well set optimized ASAP to mitigate flaring. Low gas flow rate during 10% TAPS proration caused booster compressor to go to high recycle. Flare valve manually opened to maintain temperatures and Highest GOR wells flowed into plant. Flare valve manually set to mitigate 9!23/2001 0220-0700 124 keep gas compressor running. flaring while gas compressor monitored to avoid high temperature S/D. 9/23/2001 0810-0920 91 Upsets during B-Main restart attempt after TAPS proration ended. Well set optimized ASAP to mitigate flaring. TOTAL 292 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME "DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE' TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared less than 1 hr 2,010 97 1 1,912 Volume dared greater than 292 14 0 278 1 hr Pilot Purge 9,870 476 7 9,387 Assist Gas 21.866 1.054 ~ 20.797 TOTAL FLARED VOLUME 34,038 1,641 23 32,374 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Ex loration (Alaska) Inc. Eider Oct-01 Disposition Volume MCF' 1. Sold Fuel NGL 0 0 2. Reinjected 525,118 3. Flared or vented less than 1 hour 49 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 35 5. Pilot and Purge 503 6. Used for lease operations Assist Fuel 1,149 66 715 7. Other TOTAL items 1-7 593,569 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certi~fy~t~hat the foregoing is true and correct to the best of my knowledge. Signature /!IiYU1-c- ~~1 Title ~D ~ ~~GC.~'. Date 1~ 7 Q ~ *Indicate contribution of each pool to total. Pool Name o e Percent 220165 Official Use Only-Flaring Authorization>1 hr. 1. Safety 2~, 7 MCF 2. Lease IZ 3 MCF 3. Conserv. Purposes MCF Commissio r r Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowjng the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 11/6/2001 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Oct-2001 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF1NCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 1,003 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OFiNCIDENF& CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5% proration during TAPS bullet hole repair caused plant instability which led to Booster compressor restarted as quickly as possible and plant stabilized 10/6/2001 0840-1710 209 booster compressor shut down and flaring. Assist gas used for opacity control. for low flow rates. NGL startup overloaded the booster compressor and caused flaring. Assist gas 10/7/2001 1320-1510 40 used for opacity control. NGL system restarted as quickly as possible, plant stabilized. NGL stabilizer relief valve opened to flare causing a black smoke problem. 10/9/2001 1020-1650 316 Assist gas was used to keep under opacity minimums. Failed relief valve was identified and corrected as quickly as possible. Propane shut down due to leak discovered on TEG cooler. MI shut down shortly TEG cooler leak identified and fixed, propane and MI restarted and plant 10/16/2001 0840-1040 144 after. stabilized out. TOTAL 709 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO'-'ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTIONTAKEN'TO ELIMINATE CAUSE TOTAL 0 ~9-f'y0 35'~~"0~ CSJ~~ Volume flared less than 1 hr TOTAL 003 1 EIDR 49 ~Q.Ct ~1~ SDN 1 ENDICOTT 953 , 7C~~ Volume flared greater than 709 35 0 674 1 hr 31(0 + 141' = b4.88°7o C5 ~ Cep Pilot Purge 10,199 503 6 9,690 (~ 7 - ` ~ J ~ Assist Gas 23.275 1.149 ~ 22.113 Eider' t2.3 2.2. ~ TOTAL FLARED VOLUME 35,186 1,736 , u Na~ 20 33,430 ~ Q C-~,IC°~' 236.7 ~3~~3 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Exploration (Alaska Inc. Eider Nov-Ot Disposition Volume MCF' 1. Sold Fuel NGL 0 0 2. Reinjected 537,721 3. Flared or vented less than 1 hour 60 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 8 5. Pilot and Purge 468 6. Used for lease operations Assist Fuel 1,070 60 845 7. Other TOTAL items 1-7 600,172 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: I hereby certify((th~~at t e foregoing is true and correct to the best of my knowledge. Signature ~.1:(. Title Vl/tG~- T~k' Date -Z 4 `Indicate contribution of each pool to total. Pool Name o e Percent 220165 Official Use Only-Flaring Authorization>1 hr. 1. Safety MCF 2. Lease ~~ MCF 3. Conserv. Purposes MCF Commissi er ~ Date ~- I~-cur- 31~ ~~OZ Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. ~: ~_ cr ~~ iea '~ ~ ^ =~. 4 ~F C:~ c ., _...~ k~L~' z Form 10-422 Rev. 4/95 12/5/2001 BP EXPLORATION (ALASKA) INC. ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Nov-2001 Page 1 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE. ACTION'TAKEN TO ELIMINATE CAUSE TOTAL 1,272 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Multiple A-Main gas compressor I&E failures caused full field S/D. With the gas booster down, the low pressure gasses route to flare. Assist gas used for A-MCC and gas booster brought back on-line ASAP, and plant stabilized 11/30/2001 1300-1430 167 opacity control to mitigate flaring. TOTAL 167 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared less than 1 hr 1,272 60 1 1,211 Volume flared greater than 167 8 0 159 1 hr Pilot Purge 9,870 468 7 9,395 Assist Gas 22.`2.22 1.070 ~ ~~ TOTAL FLARED VOLUME 33,861 1,606 24 32,231 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Endicott 10450 Month/Year of Disposition Endicott BP Ex loration (Alaska Inc. Eider Dec-01 Disposition Volume MCF' 1. Sold Fuel NGL 0 0 2. Reinjected 557,268 3. Flared or vented less than 1 hour 146 4. Flared or vented greater than 1 hour (Supplemental report required-•See 20 AAC 25.235) 1 5. Pilot and Purge 484 6. Used for lease operations Assist Fuel 1,099 59 690 7. Other TOTAL items 1-7 618,688 8. NGL gas equivalent produced 0 9. Purchased gas 10. Transferred from: 11. Transferred to: true and correct to the best of my knowledge. Title M (J2 Tt'r 1r Date 'Indicate contribution of each pool to total. Pool Name o e Percent 220165 Official Use Only-Flaring Authorization>1 h~, 1. Safety / MCF C 2. Lease MCF 3. Conserv. Purposes MCF ' ~lS~oY Commission Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month folowing the month of disposition. Authority 20 AAC 25.235. Form 10-422 Rev. 4/95 1/4/2002 BP EXPLORATION (ALASKA) INC. Page 1 ADMINISTRATIVE APPROVAL N0.202.4 GAS FLARING INCIDENT REPORT - ENDICOTT Dec-2001 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 3,079 Not required for unplanned events which Not required for unplanned events which are less than or equal to 1 hour are less than or equal to 1 hour Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Both gas compressors shut down, causing full field S/D. MI restart attempted, MI compressor brought to stable operations ASAP, cause of main gas 12/4/2001 1140-1250 31 causing flaring and plant upset. compressor S/D's being investigated. TOTAL 31 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 Planned Events Exceeding 1 Hour OR Exceedin g 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE TOTAL 0 TOTAL EIDR SDN ENDICOTT Volume flared less than 1 hr 3,079 146 3 2,930 Volume flared greater than 31 1 0 30 1 hr Pilot Purge 10,199 484 10 9,705 Assist Gas 23.139 ~$ ~ ~$ TOTAL FLARED VOLUME 36,448 1,730 35 34,683