Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutBPXA - LISBURNEALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition LISBURNE PRODUCTION CENTER #1 BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE 01/2001 Disposition Volume MCF' 1. Sold 158,761 2. Reinjected 9,495,241 3. Flared or vented less than 1 hour. 4,742 4. Flared or vented greater than 1 hour 6,489 Su lemental re ort re wired--See 20 AA C 25.235 5. Pilot and Purge 12,129 6. Used for lease operations Fuel 904,549 Assist 6,267 7. Other Lift Gas, Off Field 187,865 TOTAL items 1 - 7 10,776,043 8. NGL gas equivalent produced ~ 158,761 9. Purchased gas ~ ~ 0 v f7 QJ .~ 0. Transferred from: T ~ FV' °" ~ ~. } ~, o ~ -w _ f°~ '~ 11. Transferred to: :~. ~ 0 Remarks: - I hereby cent' at t foregoing i true and correct to the best of my knowledge. Signature: Title: ~~.. `(~~~C Date: ZIL~.~OI Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 47.84% 2.13% N_PRUDHOE 640152 0.00% PTMAC W BEACH West Niakuk 666100 640186 640149 45.45% 3.28% 1.30% Official Use Onl --Flarin ' Authorizatiorn> 1 hr. 1. Safety /,,G~/ ~ ~ MCF 2. Le se Usee se Use MCF 3. Conserv. Purposes MCF ,~~ Commis ner ~ ~/l~i~ay Date Note: All volumes. must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. 1-i ~~ ~~~~~y PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1/3/2001 1710-1726 76 Shutdown compressor 1800 on high vibration Unplanned Restarted compressor 1/15/2001 1715-1800 1,790 Shutdown compressor 1808 on high vibration Unplanned Restarted compressor 1/18/2001 1333-1338 170 Faulty shut down on compressor 1807 Unplanned Restarted compressor Shut down compressor 1808 on high vibration Unplanned Fixed vibration problem then restarted compressor Total Flare <= 1 Hour 2,036 1/20/2001 0719-0830 3,007 Shut down compressor 1808 on high vibration Total Flare > 1 Hour 3,007 ~ Volume Flared 5,043 ~ Measured Safety Pilot 5,787 R° v ~ ~n ~ ~~..,,e ~' Continuous Assist 2,812 j ~ ~ TOTAL FLARED 13,642 ~ ~~ « ~ „,tea.; ~":: Q O N ~ O Unplanned Fixed vibration problem then restarted compressor PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 01/03/01 1710-1726 74 Shutdown compressor 1800 on high vibration Unplanned Restarted compressor 01/15/01 1715-1800 2,099 Shutdown compressor 1808 on high vibration Unplanned Restarted compressor 01/18/01 1333-1338 159 Faulty shut down on compressor 1807 Unplanned Restarted compressor Shut down compressor 1808 on high vibration Unplanned Fixed vibration problem then restarted compressor Total Flare <- 1 Hour 2,332 01/20/01 0719-0830 3,138 Shut down compressor 1808 on high vibration Total Flare> 1 Hour 3,138 ~' Volume Flared 5,470 ~ m b ~:_, ~ Measured Safety Pilot 5,532 ~ ~ ~ ~ ~ Continuous Assist 3,020 0 ~, r`•a _n y.._.a `~~ TOTAL FLARED 14,022 '~ ~ i.,,, »:.~ e~ ~~ G_ Unplanned Fixed vibration problem then restarted compressor PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 01/03/01 1710-1726 6 Shutdown compressor 1800 on high vibration Unplanned Restarted compressor 01/15/01 1715-1800 185 Shutdown compressor 1808 on high vibration Unplanned Restarted compressor 01/18/01 1333-1338 15 Faulty shut down on compressor 1807 Unplanned Restarted compressor Shut down compressor 1808 on high vibration Unplanned Fixed vibration problem then restarted compressor Total Flare <= 1 Hour 206 01/20/01 0719-0830 94 Shut down compressor 1808 on high vibration Unplanned Fixed vibration problem then restarted compressor Total Flare > 1 Hour 94 Volume Flared 300 ~. Measured Safety Pilot 394 ~~ ~ t'r't ~.;° Continuous Assist 212 ~ ~ a7 ~ „ , , o ~ ~~ ' ~ TOTAL FLARED 906 ~ `-' ,_. ~- ~~ ~;~ ~~ ~: ., PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 01/03/01 1710-1726 0 Shutdown compressor 1800 on high vibration Unplanned Restarted compressor 01/15/01 1715-1800 0 Shutdown compressor 1808 on high vibration Unplanned Restarted compressor 01/18/01 1333-1338 0 Faulty shut down on compressor 1807 Unplanned Restarted compressor Shut down compressor 1808 on high vibration Unplanned Fixed vibration problem then restarted compressor Total Flare <- 1 Hour 0 01/20/01 0719-0830 0 Shut down compressor 1808 on high vibration Unplanned Fixed vibration problem then restarted compressor Total Flare > 1 Hour 0 ?~" ~: F ;,. Volume Flared 0 ~ .~ ,... ~"~. Measured Safety Pilot 0 ~ ~ ~ ~~ Continuous Assist 0 <-, ~ iC:. c~, ,~,.~.. TOTAL FLARED 0 ~ c~ r~ 3 ® ~~ N~ BP EXPLORATION, INC. CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 2000 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 01/03/01 1710-1726 4 Shutdown compressor 1800 on high vibration Unplanned Restarted compressor 01/15/01 1715-1800 88 Shutdown compressor 1808 on high vibration Unplanned Restarted compressor 01/18/01 1333-1338 9 Faulty shut down on compressor 1807 Unplanned Restarted compressor Shut down compressor 1808 on high vibration Unplanned Fixed vibration problem then restarted compressor Total Flare <= 1 Hour 101 01/20/01 0719-0830 151 Shut down compressor 1808 on high vibration n~ ~ ~ - ~ `~~ ;e. rt r ~~ ~I # Y ~:' ~ ,:~ ~ ~ ' Total Flare > 1 Hour 151 ~` ~-' :...~ ~ &I Volume Flared 252 r'-' < ~` ~~ ~a Measured Safety Pilot 258 a ~ ~ ~' Continuous Assist 137 TOTAL FLARED 647 Unplanned Fixed vibration problem then restarted compressor PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS JANUARY 2000 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 01/03/01 1710-1726 2 Shutdown compressor 1800 on high vibration Unplanned Restarted compressor 01/15/01 1715-1800 60 Shutdown compressor 1808 on high vibration Unplanned Restarted compressor 01/18/01 1333-1338 5 Faulty shut down on compressor 1807 Unplanned Restarted compressor Shut down compressor 1808 on high vibration Unplanned Fixed vibration problem then restarted compressor Total Flare <- 1 Hour 67 01/20/01 0719-0830 99 Shut down compressor 1808 on high vibration a~ ~. x C ~""' Total Flare > 1 Hour 99 ~ ~ ,~ ~" ~, ~-~- Volume Flared 166 ~ ~~,,~ ~ ~. v ~' Measured Safety Pilot 158 n> '°"; Continuous Assist 86 u TOTAL FLARED 410 Unplanned Fixed vibration problem then restarted compressor ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION LISBURNE PRODUCTION CENTER #1 Disposition Volume MCF' 1. Sold 116,969 2. Reinjected 7,655,776 3. Flared or vented less than 1 hour. 1,379 4. Flared or vented greater than 1 hour Su lemental re ort re uired--See 20 AAC 25.235 10,776 5. Pilot and Purge 10,980 6. Used for lease operations Fuel Assist 761,394 8,414 7. Other Lift Gas, Off Field 216,753 TOTAL items 1 - 7 8,782,441 8. NGL gas equivalent produced 116,969 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby ce that t foregoin is true and correct to the best of my knowledge. Signature: ~ Title: (l/f,(,(L `f ~CS~ Date: Form 10-422 (Revised 4/95) BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE 02/2001 *Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 45.05% 2.35% N_PRUDHOE 640152 0.00% PTMAC W BEACH West Niakuk 666100 640186 640149 46.88% 4.23% 1.49% Official Use Onl --Flarin Authorization > 1 hr. 1. Safety gyp/ 7~~ MCF 2. Lease Use MCF 3. Consenr. Purposes MCF ~'Uf'V1,v I l_!" Commissi r ~ ~~ ~ Q ' Date ~r /' ~~ Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 2000 VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 2/6/2001 1.640-1655 74 Shutdown compressor 1800 due to process upset 2/24/2001 1015-1030 0 Shutdown compressor 1808 for maintenance Unplanned Restarted compressor Planned Compressor depressured, reduced inlet gas rates Compressor depressured, reduced inlet gas rates Restarted compressor Compressor depressured, reduced inlet gas rates Maintenance currently working on compressor Maintenance currently working on compressor Maintenance currently working on compressor Maintenance currently working on compressor Maintenance currently working on compressor 2/24/2001 1110-1115 139 Shutdown compressor 1808 for maintenance Planned 2/25/2001 1527-1539 25 Shutdown compressor 1800 for low pressure Unplanned 2/27/2001 2105-2120 59 Shutdown compressor 1807 for maintenance Planned 2/28/2001 2111-2112 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 2/28/2001 2141-2146 0 Stari attempt on compressor 1807 T/C after turbine maintenance Unplanned 2/28/2001 2237-2240 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 2/28/2001 2256-2257 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 2/28/2001 2335-2338 129 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Total Flare <= 1 Hour 426 2/13/2001 0313-0559 4,097 Shutdown compressor 1808 on high vibration Total Flare > 1 Hour .4,097 Volume Flared 4,523 Measured Safety Pilot 4,745 Continuous Assist 3,100 TOTAL FLARED 12,368 Unplanned Cut gas to stop flaring, fixing bearing, compressor depressured PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 02/06/01 1640-1655 69 Shutdown compressor 1800 due to process upset Unplanned 02/24/01 1015-1030 0 Shutdown compressor 1808 for maintenance Planned 02/24/01 1110-1115 130 Shutdown compressor 1808 for maintenance Planned 02/25/01 1527-1539 73 Shutdown compressor 1800 for low pressure Unplanned 02/27/01 2105-2120 170 Shutdown compressor 1807 for maintenance Planned 02/28/01 2111-2112 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 02/28/01 2141-2146 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 02/28/01 2237-2240 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 02/28/01 2256-2257 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 02/28/01 2335-2338 326 Start attempt on compressor 1807 T/C after turbine maintenance .Unplanned Total Flare <- 1 Hour 768 02/13/01 0313-0559 5,701 Shutdown compressor 1808 on high vibration Unplanned Total Flare > 1 Hour 5,701 Volume Flared 6,469 Measured Safety Pilot 5,286 Continuous Assist 4,462 TOTAL FLARED 16,217 Restarted compressor Compressor depressured, reduced inlet gas rates Compressor depressured, reduced inlet gas rates Restarted compressor Compressor depressured, reduced inlet gas rates Maintenance currently working on compressor Maintenance currently working on compressor Maintenance currently working on compressor Maintenance currently working on compressor Maintenance currently working on compressor Cut gas to stop flaring, fixing bearing, compressor depressured PHILLIPS ALASKA, INC, CONSERVATION ORDER NO.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 2000 VOLUME PLANNED DATE TIME MSCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 02/06/01 02/24/01 02/24/01 02/25/01 02/27/01 02/28/01 02/28/01 02/28/01 02/28/01 02/28/01 1640-1655 6 Shutdown compressor 1800 due to process upset 1015-1030 0 Shutdown compressor 1808 for maintenance Unplanned Restarted compressor Planned Compressor depressured, reduced inlet gas rates Compressor depressured, reduced inlet gas rates Restarted compressor Compressor depressured, reduced inlet gas rates Malntenance currently working on compressor Maintenance currently working on compressor Maintenance currently working on compressor Maintenance currently working on compressor Malntenance currently working on compressor 1110-1115 Shutdown compressor 1808 for maintenance Planned 1527-1539 Shutdown compressor 1800 for low pressure Unplanned 2105-2120 Shutdown compressor 1807 for maintenance Planned 2111-2112 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 2141-2146 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 2237-2240 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 2256-2257 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned 2335-2338 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Total Flare <- 1 Hour 98 02/13/01 0313-0559 438 Shutdown compressor 1808 on high vibration Total F/are> 1 Hour 438 Volume Flared 536 Measured Safety Pilot 497 Continuous Assist 416 TOTAL FLARED 1,449 11 8 23 0 0 0 0 50 Unplanned Cut gas to stop flaring, fixing bearing, compressor depressured PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 2000 VOLUME MSCF PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE DATE TIME 02/06/01 1640-1655 0 Shutdown compressor 1800 due to process upset Unplanned Planned Restarted compressor Compressor depressured, reduced inlet gas rates 02/24/01 1015-1030 0 Shutdown compressor 1808 for maintenance Planned Compressor depressured, reduced inlet gas rates 02/24/01 1110-1115 0 Shutdown compressor 1808 for maintenance Unplanned Restarted compressor 02/25/01 1527-1539 0 Shutdown compressor 1800 for low pressure Planned Compressor depressured, reduced inlet gas rates 02/27/01 2105-2120 0 Shutdown compressor 1807 for maintenance t on compressor 1807 T/C after turbine maintenance Unplanned ttem St rt Maintenance currently working on compressor 02/28/01 2111-2112 0 0 p a a Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Maintenance currently working on compressor 02/28/01 2141-2146 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Maintenance currently working on compressor 02/28/01 2237-2240 t on compressor 1807 T/C after turbine maintenance Unplanned Start attem Maintenance currently working on compressor 02/28/01 2256.2257 8 0 0 p Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Maintenance currently working on compressor 02/28/01 2335-233 Total Flare <- 1 Hour 0 02/13/01 0313-0559 0 Shutdown compressor 1808 on high vibration Unplanned Cut gas to stop flaring, fixing bearing, compressor depressured Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 2000 VOLUME PLANNED DATE TIME Msc DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 02/06/01 1640-1655 3 Shutdown compressor 1800 due to process upset 02/24/01 1015-1030 0 Shutdown compressor 1808 for maintenance 02/24/01 1110-1115 6 Shutdown compressor 1808 for maintenance 02/25/01 1527-1539 5 Shutdown compressor 1800 for low pressure 02/27/01 2105-2120 12 Shutdown compressor 1807 for maintenance 02/28/01 2111-2112 0 Start attempt on compressor 1807 T/C after turbine maintenance 02/28/01 2141-2146 0 Start attempt on compressor 1807 T/C after turbine maintenance 02/28/01 2237-2240 0 Start attempt on compressor 1807 T/C after turbine maintenance 02/28/01 2256-2257 0 Start attempt on compressor 1807 T/C after turbine maintenance 02/28/01 2335-2338 27 Start attempt on compressor 1807 T/C after turbine maintenance Total Flare <- 1 Hour 53 02/13/01 0313-0559 328 Shutdown compressor 1808 on high vibration Total Flare > 1 Hour 328 Volume Flared 381 Measured Safety Pilot 2T7 Continuous Assist 268 TOTAL FLARED 926 Unplanned Restarted compressor Planned Compressor depressured, reduced inlet gas rates Planned Compressor depressured, reduced inlet gas rates Unplanned Restarted compressor Planned Compressor depressured, reduced Inlet gas rates Unplanned Maintenance currently working on compressor Unplanned Maintenance currently working on compressor Unplanned Maintenance currently working on compressor Unplanned Maintenance currently working on compressor Unplanned Maintenance currently working on compressor Unplanned Cut gas to stop flaring, fixing bearing, compressor depressured PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS FEBRUARY 2000 DATE TIME VOLUME Msc DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 02/06/01 1640-1655 3 Shutdown compressor 1800 due to process upset Unplanned Restarted compressor 02/24/01 1015-1030 0 Shutdown compressor 1808 for maintenance Planned Compressor depressured, reduced inlet gas rates 02/24/01 1110-1115 4 Shutdown compressor 1808 for maintenance Planned Compressor depressured, reduced inlet gas rates 02/25/01 1527-1539 3 Shutdown compressor 1800 for low pressure Unplanned Restarted compressor 02/27/01 2105-2120 7 Shutdown compressor 1807 for maintenance Planned Compressor depressured, reduced inlet gas rates 02/28/01 2111-21 t2 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Maintenance currently working on compressor 02/28/01 2141-2146 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Maintenance currently working on compressor 02/28/01 2237-2240 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Maintenance currently working on compressor 02/28/01 2256-2257 0 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Maintenance currently working on compressor 02/28/01 2335-2338 17 Start attempt on compressor 1807 T/C after turbine maintenance Unplanned Maintenance currently working on compressor Total Flare <= 1 Hour 34 02/13/01 0313-0559 212 Shutdown compressor 1808 on high vibration Unplanned Cut gas to stop flaring, fixing bearing, compressor depressured Total Flare > 1 Hour 212 Volume Flared 246 Measured Safety Pllot 175 Continuous Assist 168 TOTAL FLARED 589 ~ v' ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility LISBURNE PRODUCTION CENTER #1 Operator BP EXPLORATION, ALASKA Field(s) PRUDHOE BAY/PT MCINTYRE Month/Year of Disposition 03/2001 Disposition Volume MCF' "Indicate contribution of each pool to total. 1. Sold 156,652 Pool Name Code Percent 2. Reinjected 9,599,676 LISBURNE NIAKUK 640144 640148 52.99% 3.83% N_PRUDHOE 640152 0.00% 3. Flared or vented less than 1 hour. 275 PTMAC W_BEACH 666100 640186 38.92% 3.10% West Niakuk 640149 1.15% 4. Flared or vented greater than 1 hour Su lemental re ort re uired--See 20 AAC 25.235 0 5. Pilot and Purge 12,084 6. Used for lease operations Fuel Assist 924,752 9,232 ~.'. Other Lift Gas, Off Field 238,165 TOTAL items 1 - 7 10,940,836 I8. NGL gas equivalent produced 156,652 9. Purchased gas ~ 0 10. Transferred from: 0 11. Transferred to: 0 I hereby certify tha the foregoing i true and correct to the best of my knowledge. Signature: Title: ~ Date: -i -Of Form 10-422 (Revise 4/9 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety 2. Lease Use ~,,. ~.~~`"~ MCF .~` 3. Conserv. Purposes ,f`'`£ MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~~ ~,~ PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 3/8/2001 2229-2242 61 Shutdown compressor 1800 on high vibration 3/18/2001 1820-1835 88 Shutdown compressor 1800 due to process upset Total Flare <= 1 Hour 149 Total Flare > 1 Hour 0 Volume Flared 149 Measured Safety Pilot 6,398 Continuous Assist 4,915 TOTAL FLARED 11,462 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 03/08/01 2229-2242 44 Shutdown compressor 1800 on high vibration 03/18/01 1820-1835 61 Shutdown compressor 1800 due to process upset Total Flare ~= 1 Hour 105 Total Flare > 1 Hour Volume Flared 105 Measured Safety Pilot 4,709 Continuous Assist 3,534 TOTAL FLARED 8,348 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 PHILLIPS ALASKA, INC, CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 03/08/01 2229-2242 03/18/01 1820-1835 Total Flare <= 1 Hour 8 Total Flare > 1 Hour 0 Volume Flared 8 Measured Safety Pilot 374 Continuous Assist 301 Shutdown compressor 1800 on high vibration Unplanned Restarted compressor 1800 Shutdown compressor 1800 due to process upset Unplanned Restarted compressor 1800 TOTAL FLARED 683 PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 2000 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 03/08/01 2229-2242 0 Shutdown compressor 1800 on high vibration 03/18/01 1820-1835 0 Shutdown compressor 1800 due to process upset 0 0 0 0 0 0 0 0 Total Flare <= 1 Hour 0 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 TOTAL FLARED 0 BP EXPLORATION, INC. CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 2000 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 03/08/01 2229-2242 03/18/01 1820-1835 Shutdown compressor 1800 on high vibration Shutdown compressor 1800 due to process upset Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Total Flare <= 1 Hour 9 Total Flare > 1 Hour 0 Volume Flared 9 Measured Safety Pilot 464 Continuous Assist 377 TOTAL FLARED 850 PHILLIPS ALASKA, INC, CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS MARCH 2000 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 03/08/01 2229-2242 03/18/01 1820-1835 Shutdown compressor 1800 on high vibration Shutdown compressor 1800 due to process upset Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Total Flare <= 1 Hour Total Flare > 1 Hour 0 Volume Flared 4 Measured Safety Pilot 139 Continuous Assist 105 TOTAL FLARED 248 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition LISBURNE PRODUCTION CENTER #1 BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE 04/2001 Disposition Volume MCF* :. Sold 138,049 c. Reinjected . 9,196,285 ~' s. Flared or vented less than 1 hour. 301 4. Flared or vented greater than 1 hour (Su lemental re ort re uired--See 20 AAC 25.235 0 5. Pilot and Purge 11,640 6. Used for lease operations Fuel Assist 878,977 9,079 7. Other Lift Gas, Off Field 309,729 TOTAL items 1 - 7 10,544,060 8. NGL gas equivalent produced 138,049 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify~that the foregoing is true and correct to` th~e1 best of my knowledge. Signature:~~.J~•~-~ ~c~-,n..1~-a~^.. Title`.~`e*~C.~.~,.....~Date: ~~7 ~~ "Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 48.65% 6.58% N_PRUDHOE 640152 0.00% PTMAC W_BEACH West Niakuk 666100 640186 640149 41.49% 2.16% 1.11% Official Use Onl --Flarin Authorization > 1 hr. 1. Safety M 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~/~g/°? Form 10-422 (Revised.4/95) BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/12/2001 0414-0428 65 Faulty shutdown on compressor 1801 due to elec/instru malfunction Unplanned Started compressor 1800 4/21/2001 0224-0240 83 Faulty shutdown on compressor 1801 due to elec/instru malfunction Unplanned Restarted compressor 1801 Total Flare <= 1 Hour 148 • Total Flare > 1 Hour Volume Flared 148 Measured Safety Pilot 5,663 Continuous Assist 4,488 TOTAL FLARED 10,299 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 04/12/01 0414-0428 57 Faulty shutdown on compressor 1801 due to elec/instru malfunction Unplanned Started compressor 1800 04/21/01 0224-0240 69 Faulty shutdown on compressor 1801 due to elec/instru malfunction Unplanned Restarted compressor 1801 Total Flare <= 1 Hour 126 • Total Flare > 1 Hour Volume Flared 126 Measured Safety Pilot 4,833 Continuous Assist 3,644 TOTAL FLARED 8,603 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 04/12/01 0414-0428 3 Faulty shutdown on compressor 1801 due to elec/instru malfunci Unplanned Started compressor 1800 04/21/01 0224-0240 3 Faulty shutdown on compressor 1801 due to elec/instru malfunct Unplanned Restarted compressor 1801 a Total Flare <= 1 Hour 6 i Total Flare > 1 Hour Volume Flared Measured Safety Pilot 251 Continuous Assist 213 TOTAL FLARED 470 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 04/12/01 0414-0428 0 Faulty shutdown on compressor 1801 due to elec/instru malfunci Unplanned Started compressor 1800 04/21/01 0224-0240 0 Faulty shutdown on compressor 1801 due to elec/instru malfuncl Unplanned Restarted compressor 1801 Total Flare <= 1 Hour • Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 04/12/01 0414-0428 8 Faulty shutdown on compressor 1801 due to elec/instru malfunction Unplanned Started compressor 1800 04/21/01 0224-0240 10 Faulty shutdown on compressor 1801 due to elec/instru malfunction Unplanned Restarted compressor 1801 Total Flare <= 1 Hour 18 Total Flare > 1 Hour 0 Volume Flared 18 Measured Safety Pilot 754 Continuous Assist 648 TOTAL FLARED 1,420 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 04/12/01 0414-0428 1 Faulty shutdown on compressor 1801 due to elec/instru malfunction Unplanned Started compressor 1800 04/21 /01 0224-0240 2 Faulty shutdown on compressor 1801 due to elec/instru malfunction Unplanned Restarted compressor 1801 Total Flare <= 1 Hour Total Flare > i Hour Volume Flared Measured Safety Pilot 139 Continuous Assist 86 TOTAL FLARED 228 LISBURNE PRODUCTION CENTER #1 Disposition 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour. 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC ~. Pilot and Purge ~ ~. Used for lease operations 7. Other TOTAL items 1 - 7 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: Remarks: ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE Volume MCF' 'Indicate contribution of each pool to total. 160,488 Pool Name Code Percent 9,085,809 LISBURNE NIAKUK 640144 640148 46.44% 3.97% N_PRUDHOE 640152 0.00% 713 PTMAC W_BEACH 666100 640186 47.19% 1.06% West Niakuk 640149 1.35% ?5.235) 0 11, 996 Fuel Assist 889,170 8,283 Lift Gas, Off Field 324,224 10,480,683 160,488 ~- ~ 0 n C °~ z~ m 0 ,~ '~ cry ~ o o iTy poi ear or uisposition 05/2001 Official Use Onl --Flarin Authorization > 1 hr. 1. Safety f~ l= 2. Lease Use J ~r~ CF ~` 3. Conserv. Purposes ~~ ,~" MCF Commissioner Date 3_ ~ 0 - ~ Note: All volumes must be corrected to pressure of 14 65 I hereby certify that the foregoing is true and correct~~to~~ the~~best~~of my..k~~nowledge. Signaturei/ _ Title: 1J~~ot~ l,~.Gc.C; . Date: 6 ' 2 (- O ~ Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~~2 f BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/13/2001 2202-2218 69 Process upset compressor 1800 Unplanned Restarted compressor 1800 5/15/2001 1310-1320 28 Elec/Instru malfunction, faulty shutdown on compressor 1801 Unplanned Corrected E & I problem & restarted compr 1801 5/22/2001 0257-0313 162 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 5/22/2001 1355-1409 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 5/22/2001 1538-1555 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 5/24/2001 1536-1549 47 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 Total Flare <- 1 Hour 306 Total Flare > 1 Hour 0 Volume Flared 306 Measured Safety Pilot 5,564 Continuous Assist 3,589 TOTAL FLARED 9,459 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 05/13/01 2202-2218 68 Process upset compressor 1800 Unplanned Restarted compressor 1800 05/15/01 1310-1320 30 Elec/Instru malfunction, faulty shutdown on compressor 1801 Unplanned Corrected E & I problem & restarted compr 1801 05/22/01 0257-0313 219 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/22/01 1355-1409 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/22/01 1538-1555 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/24/01 1536-1549 49 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 Total Flare <- 1 Hour 366 Total Flare > 1 Hour 0 Volume Flared 366 Measured Safety Pilot 5,672 Continuous Assist 4,168 TOTAL FLARED 10,206 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 05/13/01 2202-2218 1 Process upset compressor 1800 Unplanned Restarted compressor 1800 05/15/01 1310-1320 0 Elec/Instru malfunction, faulty shutdown on compressor 1801 Unplanned Corrected E & i problem & restarted compr 1801 05/22/01 0257-0313 5 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/22/01 1355-1409 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/22/01 1538-1555 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/24/01 1536-1549 2 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 Total Flare <= 1 Hour 8 Total Flare> 1 Hour 0 Volume Flared 8 Measured Safety Pilot 127 Continuous Assist 104 TOTAL FLARED 239 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 05/13/01 2202-2218 0 05/15/01 1310-1320 0 05/22/01 0257-0313 0 05/22/01 1355-1409 0 05/22/01 1538-1555 0 05/24/01 1536-1549 0 0 0 0 0 Total Flare <= 1 Hour 0 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 Process upset compressor 1800 Unplanned Restarted compressor 1800 Elec/Instru malfunction, faulty shutdown on compressor 1801 Unplanned Corrected E & I problem & restarted compr 1801 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-01 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 05/13/01 2202-2218 4 Process upset compressor 1800 Unplanned Restarted compressor 1800 05/15/01 1310-1320 3 Elec/Instru malfunction, faulty shutdown on compressor 1801 Unplanned Corrected E & I problem & restarted compr 1801 05/22/01 0257-0313 14 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/22/01 1355-1409 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/22/01 1538-1555 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/24/01 1536-1549 4 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 Total Flare <= 1 Hour 25 Total Flare > 1 Hour 0 Volume Flared 25 Measured Safety Pilot 474 Continuous Assist 319 TOTAL FLARED 818 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-01 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 05/13/01 2202-2218 1 Process upset compressor 1800 Unplanned Restarted compressor 1800 05/15/01 1310-1320 1 Elec/Instru malfunction, faulty shutdown on compressor 1801 Unplanned Corrected E & I problem & restarted compr 1801 05/22/01 0257-0313 5 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/22/01 1355-1409 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/22/01 1538-1555 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 05/24/01 1536-1549 1 Elec/Instru malfunction, faulty shutdown on compressor 1800 Unplanned Corrected E & I problem & restarted compr 1800 Total Flare <= 1 Hour 8 Total Flare> 1 Hour 0 Volume Flared 8 Measured Safety Pilot 159 Continuous Assist 103 TOTAL FLARED 270 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION acility Operator Field(s) Month/Year of Disposition '.LISBURNE PRODUCTION CENTER #1 BP EXPLORATION, ALASKA PRUDNOE BAY/PT MCINTYRE 06/2001 Disposition Volume MCF* "Indicate contribution of each pool to total. ' .Sold 132,672 Pool Name Code Percent Reinjected 3. Flared or vented less than 1 hour. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 5. Pilot and Purge 6. Used for lease operations 7. Other TOTAL items 1 - 7 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 7,939,515 234 0 11,489 Fuel 824,029 Assist 9,621 Lift Gas, Off Field 347,696 9,265,256 132,672 0 0 t 1. Transferred to: I 0 Remarks: I hereby ce that t foregoinc, is true and correct to the best of my knowledge. Signature: Title: r/46/L,'t-(~'K Date: ~ i3 0 LISBURNE NIAKUK 640144 640148 40.36% 4.10% N_PRUDHOE 640152 0.00% PTMAC W BEACH West Niakuk 666100 640186 640149 53.61 0.50% 1.42% Official Use Onl --Flarin Authorization > 1 hr. 1. Safety 2. Lease Use MC 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. / ~ t~ /~~ v~ BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/20/2001 1416-1433 92 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Restarted compressor 1801 6/20/2001 1700-1708 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Started compressor 1801 Total Flare <= 1 Hour 92 Total Flare > 1 Hour Volume Flared 92 Measured Safety Pilot 4,628 Continuous Assist 3,841 TOTAL FLARED 8,561 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 06/20/01 1416-1433 128 Elec/Instr malfunction, faulty shutdown on compressor 1801 06/20/01 1700-i 708 Elec/Instr malfunction, faulty shutdown on compressor 1801 Total Flare <= 1 Hour 128 Total Flare > 1 Hour Volume Flared 128 Measured Safety Pilot 6,170 Continuous Assist 5,208 TOTAL FLARED 11,506 Unplanned Restarted compressor 1801 Unplanned Started compressor 1801 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 06/20/01 1416-1433 06/20/01 1700-1708 Total Flare <- 1 Hour Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 59 Continuous Assist 57 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Restarted compressor 1801 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Started compressor 1801 TOTAL FLARED 116 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 06/20/01 1416-1433 0 06/20/01 1700-1708 0 0 0 0 0 0 0 0 0 Total Flare <= 1 Hour 0 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Restarted compressor 1801 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Started compressor 1801 TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 06/20/01 1416-1433 10 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Restarted compressor 1801 06/20/01 1700-1708 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Started compressor 1801 Total Flare <= 1 Hour 10 Total Flare > 1 Hour Volume Flared 10 Measured Safety Pilot 470 Continuous Assist 374 TOTAL FLARED 854 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 06/20/01 1416-1433 06/20/01 1700-1708 Total Flare <= 1 Hour Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist 162 141 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Restarted compressor 1801 Elec/Instr malfunction, faulty shutdown on compressor 1801 Unplanned Started compressor 1801 TOTAL FLARED 307 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility operator LISBURNE PRODUCTION CENTER #1 BP EXPLORATION, ALASKA Field(s) montnirear of uisF PRUDHOE BAY/PT MCINTYRE 07/2001 Disposition Volume MCF* 1. Sold 93,611 2. Reinjected 7,874,932 3. Flared or vented less than 1 hour. 738 4. Flared or vented greater than 1 hour 13,913 Su lemental re ort re uired--See 20 AAC 25.235) 5. Pilot and Purge 11,901 6. Used for lease operations Fuel 802,446 Assist 61,374 7. Other Lift Gas, Off Field 297,222 TOTAL items 1 - 7 9,156,137 v 8. NGL gas equivalent produced o p ~a 93,611 9. Purchased gas ~~ ~ ~ ~, ~ ["[1 0 ~, 10. Transferred from: ~ N C7 ~ °~ ~~ 0 11. Transferred to: ~. s ~' 0 Remarks: I hereby certif hat the oregoing is true and correct to the best of m y knowledge. Signature: Title: IN j, C~ [Z '"(~C k Date: $ 6co U *Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 42.89% 4.25% N_PRUDHOE 640152 0.00% PTMAC W BEACH West Niakuk 666100 640186 640149 51.36% 0.04% 1.46% Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MC ,:.• t ~ '~ 2. Lease Use ~ r MCF f 3. Conserv. Purposes ~ MCF ,~ Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~n~ Form 10-422 (Revised 4/95) BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/2/2001 2207-2226 39 7/4/2001 0415-0431 48 7/16/2001 2056-2059 0 7/16/2001 2102-2104 0 7/16/2001 2243-2245 40 7/16/2001 0203-0215 46 7/18/2001 0909-0926 28 7/27/2005 2003-2020 70 Temp monitor failure shudown compressor 1800 High suction scrubber level shutdown compressor 1800 High suction scrubber level shutdown compressor 1800 High suction scrubber level shutdown compressor 1800 Elec/instru malfunction shutdown compressor 1800 Elec/instru malfunction shutdown compressor 1800 Temp monitor failure shudown compressor 1800 Shutdown compressor 1801, low pressure Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Corrected E&I failure and restarted compressor Unplanned Restarted compressor 1800 Unplanned Stabilized process and restarted compressor Total Flare <- 1 Nour 271 7/21/2001 0727-0729 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 7/21/2001 1004-1005 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 7/21/2001 1319-1407 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 7/21/2001 1437-1452 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 7/21/2001 1455-1656 1,924 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 7/22/2001 0727-1348 0 Sweeping 24" common line to LPC from Li to initiate repairs Unplanned Common line repair underway 7/22/2001 1740-1844 9,126 Sweeping 24" common line to LPC from L1 to initiate,repairs Unplanned Common line repair underway Total Flare > 1 Hour 11,050 Volume Flared 11,321 Measured Safety Pilot 5,172 Continuous Assist 43,929 TOTAL FLARED 60,422 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN_TO ELIMINATE CAUSE 07/02/01 2207-2226 65 Temp monitor failure shudown compressor 1800 07/04/01 0415-0431 65 High suction scrubber level shutdown compressor 1800 07/16/01 2056-2059 0 High suction scrubber level shutdown compressor 1800 07/16/01 2102-2104 0 High suction scrubber level shutdown compressor 1800 07/16/01 2243-2245 61 Elec/instru malfunction shutdown compressor 1800 07/16/01 0203-0215 69 Elec/instru malfunction shutdown compressor 1800 07/i 8/01 0909-0926 72 Temp monitor failure shudown compressor 1800 07/27/05 2003-2020 94 Shutdown compressor 1801, fow pressure Total Flare <= 1 Hour 426 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Corrected E&I failure and restarted compressor Unplanned Restarted compressor 1800 Unplanned Stabilized process and restarted compressor 07/21/01 0727-0729 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1004-1005 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1319-1407 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1437-1452 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1455-1656 1,630 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/22/01 0727-1348 0 Sweeping 24" common line to LPC from L1 to initiate repairs Unplanned Common line repair underway 07/22/01 1740-1844 0 Sweeping 24" common line to LPC from L1 to initiate repairs Unplanned Common line repair underway Total Flare > 1 Hour 1,630 Volume Flared 2,056 Measured Safety Pilot 6,035 Continuous Assist 12,439 TOTAL FLARED 20,530 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 07/02/01 .2207-2226 0 Temp monitor failure shudown compressor 1800 Unplanned Restarted compressor 1800 07/04/01 0415-0431 0 High suction scrubber level shutdown compressor 1800 Unplanned Restarted compressor 1800 07/16/01 2056-2059 0 High suction scrubber level shutdown compressor 1800 Unplanned Restarted compressor 1800 07/16/01 2102-2104 0 High suction scrubber level shutdown compressor 1800 Unplanned Restarted compressor 1800 07/16/01 2243-2245 0 Elec/instru malfunction shutdown compressor 1800 Unplanned Restarted compressor 1800 07/16/01 0203-0215 0 Elec/instru malfunction shutdown compressor 1800 Unplanned Corrected E&I failure and restarted compressor 07/18/01 0909-0926 0 Temp monitor failure shudown compressor 1800 Unplanned Restarted compressor 1800 07/27/05 2003-2020 0 Shutdown compressor 1801, low pressure Unplanned Stabilized process and restarted compressor Total Flare <- 1 Hour 0 07/21/01 0727-0729 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1004-1005 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1319-1407 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1437-1452 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1455-1656 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/22/01 0727-1348 0 Sweeping 24" common line to LPC from L1 to initiate repairs Unplanned Common line repair underway 07/22/01 1740-1844 0 Sweeping 24" common line to LPC from L1 to initiate repairs Unplanned Common line repair underway Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 5 k Continuous Assist 0 TOTAL FLARED 5 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 07/02/01 2207-2226 0 Temp monitor failure shudown compressor 1800 07/04/01 0415-0431 0 High suction scrubber level shutdown compressor 1800 07/16/01 2056-2059 0 High suction scrubber level shutdown compressor 1800 07/16/01 2102-2104 0 High suction scrubber level shutdown compressor 1800 07/16/01 2243-2245 0 Elec/instru malfunction shutdown compressor 1800 07/16/01 0203-0215 0 Elec/instru malfunction shutdown compressor 1800 07/18/01 0909-0926 0 Temp monitor failure shudown compressor 1800 07/27/05 2003-2020 0 Shutdown compressor 1801, low pressure Total Flare <- 1 Hour 0 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Corrected E&I failure and restarted compressor Unplanned Restarted compressor 1800 Unplanned Stabilized process and restarted compressor 07/21/01 0727-0729 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1004-1005 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1319-1407 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1437-1452 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1455-1656 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/22/01 0727-1348 0 Sweeping 24" common line to LPC from Li to initiate repairs Unplanned Common line repair underway 07/22/01 1740-1844 0 Sweeping 24" common line to LPC from L1 to initiate repairs Unplanned Common line repair underway Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot Continuous Assist ,,. TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 07/02/01 2207-2226 5 Temp monitor failure shudown compressor 1800 07/04/01 0415-0431 4 High suction scrubber level shutdown compressor 1800 07/16/01 2056-2059 0 High suction scrubber level shutdown compressor 1800 07/16/01 2102-2104 0 High suction scrubber level shutdown compressor 1800 07/16/01 2243-2245 4 Elec/instru malfunction shutdown compressor 1800 07/16/01 0203-0215 4 Elec/instru malfunction shutdown compressor 1800 07/18/01 0909-0926 5 Temp monitor failure shudown compressor 1800 07/27/05 2003-2020 8 Shutdown compressor 1801, low pressure Total Flare <- 1 Hour 30 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Restarted compressor 1800 Unplanned Corrected E&I failure and restarted compressor Unplanned Restarted compressor 1800 Unplanned Stabilized process and restarted compressor 07/21/01 0727-0729 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1004-1005 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1319-1407 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1437-1452 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1455-1656 274 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/22/01 0727-1348 0 Sweeping 24" common line to LPC from L1 to initiate repairs Unplanned Common line repair underway 07/22/01 1740-1844 652 Sweeping 24" common line to LPC from L1 to initiate repairs Unplanned Common line repair underway Total Flare > 1 Hour 926 Volume Flared 956 Measured Safety Pilot 513 Continuous Assist 3,752 TOTAL FLARED .,. 5,221 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-01 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 07/02/01 2207-2226 1 Temp monitor failure shudown compressor 1800 Unplanned Restarted compressor 1800 07/04/01 0415-0431 1 High suction scrubber level shutdown compressor 1800 Unplanned Restarted compressor 1800 07/16/01 2056-2059 0 High suction scrubber level shutdown compressor 1800 Unplanned Restarted compressor 1800 07/16/01 2102-2104 0 High suction scrubber level shutdown compressor 1800 Unplanned Restarted compressor 1800 07/16/01 2243-2245 2 Elec/instru malfunction shutdown compressor 1800 Unplanned Restarted compressor 1800 07/16/01 0203-0215 2 Elec/instru malfunction shutdown compressor 1800 Unplanned Corrected E&I failure and restarted compressor 07/18/01 0909-0926 2 Temp monitor failure shudown compressor 1800 Unplanned Restarted compressor 1800 07/27/05 2003-2020 3 Shutdown compressor 1801, low pressure Unplanned Stabilized process and restarted compressor Total Flare <= 1 Hour 11 07/21/01 0727-0729 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1004-1005 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1319-1407 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1437-1452 0 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/21/01 1455-1656 92 Depressured 24" common line to initiate repairs Unplanned Initiated repairs 07/22/01 0727-1348 0 Sweeping 24" common line to LPC from L1 to initiate repairs Unplanned Common line repair underway 07/22/01 1740-1844 215 Sweeping 24" common line to LPC from L1 to initiate repairs Unplanned Common line repair underway Total Flare > 1 Hour 307 Volume Flared 318 Measured Safety Pilot 176 «~ Continuous Assist 1,254 TOTAL FLARED 1,748 Jul-18-O1 15:56 From-PRB OPERATIONS 907-659-5061 T-900 P.02/02 F-808 I FLARB Gas VENTING RBPORT PHI>,L,tPS al_aSKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACIIJTY: ~'• `).PC :..: ~ ~• ~ .:'.' PERMIT NO. .:aA7`!-AiO,C~t5 `..: ' GAS DISPOSITION pate of Occurrent®: 7/1t3l2tJ01 OFare G]vent Time of Occurrence: (mm/ddryy) (Check Selection) ~:Qp 2&:4Q htlnut~ Front: 20:56 To: 20:59 = 00:03 Tots! Volums Flared: to6.9 MSCF BBLS From: 21:02 Ta: 21'04 = p0:o2 ~_ From: 22:x3 To: 22:45 00;02 Mkt: Nr~ ; ~ ~ £2.2~ ~ ~ B . Foci i • • ^ Planned ®unplanned From: To: _ (Check Selection) From: To: o From: ~' To: _ Total Mlnertos Flared: - 00:07 (LJstwrne Onry - Cis flared was from ~ upstream ^ downstream /Check Ortal (InGuodes volume flared which generated black smoke, of TEG contactor meter at LPC) if applicable) A. De9oription of Incident and Cause: (ChscK as many as neadeA to fully describe the irlcidelrt) S/D T/C# for Process Upset in _ ___ _ _ _ _ T/C 3p Que to High exhayst tetr~erature section of lacfllty Seal ell system dNllclfliles Flaring for dr~sife shutdown / sWnup EMERC3ENCY SHLfrDOWN Flare system testing X Elect0a91 /Instrumentation maftunctlon Faulty shutdown on Elect6cal /Instrumentation mattuncnon Facltity maintenance Wigh ambi®nt temperatures. at other 1a~Ary (T&D) S/D on high vibration C3as transit system avalpr9saure X Other: High pressure fiats relief nff of Dadaag CPF/Ftow Station out high pressure seperatar opened Excessive / insuftlCfent InIAt gas rates into IaCillty B, Action TaKOn to Eifrninato cause and Prsverrt liecurren~: (Check and describe as applicable) Started /restarted 7/C # StablGzgd facifiry process and opa•ation Compressor / train dAptassured Repaired equipment difficulties ~_ Reduced /increased inlet gas rates with Completed flare testing Facliily mainiananoe completed X Corrected E&l fluciuatian /failure Other. Corrected E&1 fluctuation /failure at other facility (T&D) Black Smoke Did incident cause black smoke? Yes: ^ No: ^+ (If Yts, continue with this sectkxt) Did incident present a potential if-reat to human health or safety? Yes: ^ No: ^ (If Yes, report to FEC tie soon as possible. if No, report to ApEC with 24 hours.) Black smoke emitted from source: (enter tdg number and description) Notified ADEC by Faxon: Date: Time: Ropolt the rollowlnA [nAartnatlon to AAEG wimin ?A Roure 13Y FAX (907-269.7508r Date and Gme of black smoke event: From: To: _ Volume flared which generated black smolo~ (if different from above): MSCF pp~S De-..crippon of steps to minimize emissions: Sae Section B, above. Type of materials burned: Gas: NCa[.s: Oflter: General Weather. Air7emperature: __ _ Wind Speed/Direetion: Name and phone number of person making the repo Elliott Weld B59-SBt30 Name Phone No. Based on information and belief formed afie r in uiry, I certify that the statements arid information in and attached to this document are true, accurate and complete. ~-7 Facility 5upervisvr Date (?._/ -` ~ ~~,~ cc: EOC Supervisor, P fi (flare gee and black smoke incidents) Field Errvironmen I mplience Gowdinators, PFO 7 (Black SmoKe incid@nts only} ~(/G Ca PMA OperaCo Man eeri gBTechnical Aida, (C3PMA e)ports only - ATO 477) AI ~Sk~ ail rg 2 O < ~~~ Kuparuk: Field Environmental Compliance Coordinators, NSK BZ (flare gas and black smoke ircident~cs CQns• C Uptiat9d: FEC Bl9t3 Spt11•Ga8 f3epomng FormsWT1701f1die re"pblC1 Jul-26-O1 09:14 From-PRB OPERATIONS 90T-659-5061 T-912 P.02/05 F-839 • ~~+r.a. ~~.~ rain ~+1~\i nCrvrl l PHILLIPS ALASKA, INC, • PRUDMOE BAYlGPMA/KUPARUK FACILITY: .. :.: ~ [;PA". ., ~ . .. PERMIT NO. ~ ... ~ :.8A78=Ai4,i12S : ~ : ° . . G4S DISPOSITION pate ofaccurrrmoa: 7/1BI200i Or~re ^ysr,t Y;rr,e ofOcturrence• (mmldd/yy) (Check Selection} 11Q:SX! 24;QQ Minutes From: 09:08 To: 09:26 OO:t7 Total Volume Flared: io~.~4 MSCF f3f3LS Fram: '~'~ To: ~, Frorn: To: Ir!IeteF•Nf2.: ~ : •'~.: ~~.::.•: F3 ~FtlCill ^Pla~mext I]unplanr>ed From; To: (Check Selection) From: To: From: ~ To: Toter Mlnutos Flared: ~ 00:t9 (usomna o»ly -Gas tiaras wes from [/] upstream ^ down4ream (check ono! (Includes volume flared which generated black smoke, of TEG contactor mater of LPC) if appticat>/e) A. Dascrlptton of Incident and C8Ulc0: (Check as m$ny as nootlod to fatly deacri6e the Inci<wnt) S/D T/CX f~ T/C SD due to high exhartst temperature Soar oil system ditficttltles EMEAQ,ENCY SHIfTDOWN electncal ~ Insu„merrtatfon malfunction E[eCtricat / Instnlmentatian maltuncdon 8[ other taGlity (f&p) Gas transh system ovarpr~ura j( Dadctng CPF~FIOw Station out Excessive / insutfldent inlet gas rates into faallity B. Action Taken to Eliminate Cause and PreverII Recurrence: (Chock and descrit~e as eppllraplo) X_ Started /restarted T/C # 1800 SNAP T/C Conlpresuor / train dapressured Reduced /increased inlet gas rates Completed flare testing ___"___ Corrected E&I fluctuation /failure Correct®d E&l Aucfiuation /failure at other facility (T&D) Black Smakfa Process upsAt in aacli~ or tacrcrcy Klaring for drlllsite shutdown /startup Flare system testing Faulp+shutdown on Fadliry maintenance High emDir>nt temporaturas. S/p an high vibration Other: 1804 S'fV/1P T/C shutdown on to h tem monitor fault Sbbilized facility procr~.ss and Operation Repaired ®quipment difficulties with Facility maintenance cxuttpleted Other: Did incident caus® Lack smoke? Yes: ^ No: Q (If Yes, continua with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: O (If Yes, r®port to FEC at3 soon as possible, tf No, report to ADEC with 24 hours-) 81aok smoke emitted #ram source: (enter tag number and de~..cription) Notified ADEC by Fax on. Rate: Time: Report the 1o11o4ring information to ADEC vrrchin 24 hours BY FaX (9tly-2bg-7608): Date antl Gme o1 black smoke eve»t: From: ro; Volume flared which generated black smoke (if differ~t from abov9): MSGF Description of steps to minimize emiesions: See S®ctfon B, above. Typo of materials burned: Gas: NGLs: ether: General Weather: Air7emperature: Wind Speed/Direction: Name and phone number a(person making the report: Noma kissed an lntormanon antl belief formed after document era true, accurate and~lalefe.i Facility supervisor Aate 0 Phony No. cc: kOG Supervisor, PRB 6 (Ildre gas and black smoke incidents) Field Environmental Compliance Coordinatore, PRB 7 (Black Smoke incidents only) P6U/GPMA F-teld Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GpMA reports only - ATO 477) Kuparuk: Field Ernrironmental Compliance Coortlinators, NSK 81 (flare gas ark plack smoke incideniv) I certify that the statements and information in and pBLS Upaaietl: FEG 6188 Spill-Gas gep4rting Formsw7a401flare report.xls Ju1-28-01 09:14 From-PRB OPERATIONS 907-659-5061 T-912 P.03/05 F-839 rLMr'I r. ~7N0 VCIV 1 IlVla 1'itl'UMf I PHILLIPS ALASKA, INC, - PRLlDHOE BAY/GPMA/KUPARUK FACILITY: ' : •'t.PO' : .: ~ P(=RM1T NO. :.: •!?A7~tAAl~$5.: GAS DISPOSITION Qata of Occurrence: 7/2t/g0pt QFlare [Wont Time of Oe ca• (mmlddryy) (Che'clc Seiectian) OQ:I~,t aa~,-rxi • inures From: 07:27 To; 07:29 = 00:02 Total Valuma Flared: 1.85 MsCF ~BBLS From: To: From: To: - M~ater•No,:~ '~...$2.~. ~Falt;.iYt ~ []Planned ~'J+, unplanned From: To: ~'" _ (Check Selection) From; To: a Fram: To: _ Total Minutes Ftared: - 00:02 (LMDurne Ony -Coal 11ar®d was rrom ~ upstream ^ eownstr~nm {Crack one) (Irtdudes volume Hared which generated black smoke, o! TEG contactor rnetoi ar LPC) if applicable) a, Oescrlptton of tnCidetlt and Cause: (CtteciC as many as needed to fully describe the inadent} S/Ll T/Cu for _ T/C SD due to nigh exhaust temperature ~_ Seal oil system dliflcuttles _ fMEf~CaENCY SHUTDOWN X Electdcai r Ir-slrumentation mtlffuncuon Elecincat ! lnstrurnentation mattuncnon ~~ at other ladliry (T&D) _ Gas transit system overpressure X backing CPF/Flow Station out Excessive ! lnsullitiont inlet gas ratAS Into facility s. Action Taken to E;iminate Cawa antl Prevent Recurrence: (Check and tl9acribe as applicable) Started / r®sfaRed r/C ~ _ Compressor/ train depressured _~ Reduced /increased inlet gas rates Completed flare testing X Corrected E8cl fluctuation / failur® Corrected E&1 fluctuation /failure at other facility (T&D) Process upset in section of lacfli[y Flaring for ~Illslt® shutdown 1 startup Flare system lasting Fa~dty shtadown on t=achy malntenanca High ambiAnt terrq~eratUres. S/D on high vibration Other: Ff~gh pressure flare relief off of high pressure separator opened 29 f?01070V due to feu#ty switch Stabilized facility process and operation Repaired equipment difficulti®s with Fac9iry maintenance completed Other. Did incident cause black smoke? Yes: © No: i[a (if Yes, continue with this section) Did incident present a potential threat to human health or safety? Yts: ^ No: ^ (lf Yes, report to FEC as soon as possible. If No, report to ApEC with 24 hours.} Black smoke emitted from source: _ (en#er tag number and description) Notified ADEC by Fax on: Data: ' ~"~ Time: Report the fnllauring information to Ap(C Within ~ hours BY FAX(907-26~y$Q8): Date and time of Flack smoke event: From: Ta; Volume flared which generated plack smoke (if differe~tt from above): MSCF BBLS Qescription of steps to minimlxa emissions: Sae Section B, above. Type Of materials hurried: Gas: NCaLs: Other: _ _ _ Qeneral Weather: Air Temperature: Wind Speed/Directlorl: Name and phone number of person making the report Md-Andon 859-!3860 Name Phone No. Based an information and belief formetl aftEr re sarmble inquiry, I certify inat the statements and information in and attached to this document are true, accurate and p Facility Sup®rvisor Oats ZZ cc: EOC Supervise , 8 fi (flare gas and black smoke incidents) Field Environmental Compliance Coordinatoro, PRD 7 (black Smoke incidents only) PBU/GPMA Fialtl Managers, (Black smoke incidents only) GPMA Operaiians Engineering Technical Aide, (GPMA repasts only - ATO 477) Kuparuk: Frca#d Environmentaf Compliance Coordinators, NSK fit (flare gas and blade smoke incidents) Uptla:ee~ FEC 8l9B SpFll-gas Repotslog FormB~OT210111are repon.xrs Jul-28-O1 09:14 From-PRB OPERATIONS 907-659-5061 T-912 P.04/05 F-839 r~iane ~aA~ vt:rv t trvta Ml;f'Uh( I PHILLIPS ALASKA, INC. • PRUDH4E BAY~GPAIIAI FACfLITY: .. .. ' kRG • • ~ ~ • ~ . ' :•• : PERMIT NO. GAS DISPOSITION Date of 8scurrence: 7/21/2001 OFlaro ]Vent (mrNdd/yy) (Check selection} Total Volume Flared: 39t9 MSGF BBLS MRtdr:NGr.: ~t722: ~' l3 1^aelli ~ gPiarme4 DUnplanned {Che~cK Selection) (Lisburne OMy ~ fps 1larad eves from~]+, upstream ^ drnvnstrcxm lChaekOne) of 7~t; contactor motet at LPC) K lime 4~QC curcence, QQ:04 ~.~ Mtnutes From: 1o:oq To: 1o:as = oo:ot From: f$:t9 To: 14;47 r 00:a8 From: 1437 To; 14:52 = OO~t 5 From: f4:SS To: 16:Sb ~ 02:01 From: To: _ From: To: Total Minutes Flerod: - 03:05 (Includos volume flared which gorleratad black smoke, it appllcable) A. Description of InciQetlt and Cause: (Check as many es needed to fully descrlpe the incident) SID TiC~ for T/C SD due to tttgs7 exhaust temperature s®al oil system dilticuRles EMERL~FNCY SMlJ1'DOtNN ,~_ Electrical /Instrumentation rnaltunetbn Electrical f Instrumentation manunetion at otnor racil~ty (T&p} -- - 4as transit system overpressure X backing CPFJFIow Station out Exo95slve / insulrlciem inlet gas rates into lacility B_ Action TaKen to Eliminate Cause anq Prevern Fieoterrenco: (Check and describe as applicable) Started /restarted 7!C ~ Compressor/ train depressured Reduced /increased inlet gas rattrs Completed flare testing ~" Corrected E&I fluctuation /failure Correcteq F&I fluctuation /failure at ether facility (T&D) 81ack Smoke Process upset In sQCrion of taa~ty Flaring rot drillsita shutdown /Startup Flare system testing Faulty shutaowrt on FacHiry maintenance High ambient temperatures. SID on high vibration Other: Da~resauring 24" common line ~d (_f~G from L1 ,~„r, , E wt ~e S_ awl !3.41x! F_ Stabaized faciiiry process and operation Repaired equipment difficulties with Facility maintenance completed Other: Did incident cause black smok®? Yes: ^ IVo: ~ (ff Yes, Continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ ~; ^ (If Yes, report to FFC a6 soon ae possiblm. If No,.repart to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Faxon: gate: Time: Report the following intormatinn to ADEC within 2d hours @Y FAX (907-269-75pg); Date and time of black smoke esvent: From: To: _ _ Volume flared which ganrjrated black smoke (if dill®r~i from above): MSCF t3BLS Description of steps to minimize emissions: Se® Section B, above. Types of materials burned: lass: NGLs: Oth®r: Qeneral Weather: Air Temperatur®: ~----- end Speed/pirection: Name and phone number at person making file report: McLendon 859&660 ` Name Ahone No. Barad on information and bE document are true, accurate Facility Supervisor the statements and information in and attached to oat® z d CII: EOC SUp9Nisor, 118 6 (flare gas and black smoke incidents) Field Pnvironmental Compliance Coordinators, PR9 T (Black SmoKe incitl9nta only) PSUlQpMA Field Managers, (Black smoke incident only) GPMA Operations f=ngineering Technical Aid®, (GPMA reports only - ATO 4'77) Kuparuk: Field Environmental Compliance Coordinators, N3K E1 (flare gas and black smoke incdents) Updated: FEC 8~9a spilaGae Raporrin® FcrmcW9270tA2ffare repart.zla Jul-28-O1 09:15 From-PRB OPERATIONS 90T-659-5061 T-912 P.05/05 F-839 .~ bate of Occurrence: 7/2212oot D~rc ^venc (tttrNdd/yy) (Check Selecdorr) Total Volvnee Flared; 6a93 _MSCF BBL.S oL[il'NcS. ~ •' b~~' : ! .Fadti ' ^ Phnne4 ®trl~nned (Check S~aleeoGan) (Lisrrumo or,:r,~r ° t995 IJirad -veslram ©ua~em d aown®ream (Cnaar Onej 0 w ~G oontacror r~t®ra[t LPC) o once: ~ ~a•m Aa From, ~~ Ta: ~a•a8 - ~2z From: 17:40 'fo: 7s:A4 -' _ o~ ~s From; Tp: _ - Ftnrrr To: ~ - From: To: ~ ~ From: '_ _ "'__.... Ycrtal Mlnu[ga Flarotl: - x725 - eae~ (Ir~clualee volume flared wh/Gt~rerafed 6r/8ck srnaka, fYappJic~) A. Oaacrtption or Inoldaret and Cauao: (Chock as many as nestled to fatly tlarte+ibe the incident) ~,.~ ~~ ".~:.a. S!D 7ACe fcr Process upapr In ~~ T/G SR doe to hlgtl erhriua[ ter:poratrere s~ifoil of f~cl(liy ~ 8r3a10ll svs[em 4ifilcualas .--~Ar~ror-dFite~uhv[dvwi- / atanu FMEFiOENG^I sHUR7QWN . - •'.~ ~ `- - - -- - -••-•-- Pfnro gyetem tasting P T-~ l:lectnCar / inairument4tlon ma~Rungbn ~~ Fauly ahuedowrt 4n __ El.arf~! ~ Ins{rYmauatiorr rnaquruilon ~Y Facllfry malnl9nanaa - - -- ~.. • ~~~ HtSh srnbiant lotnperatur+~s, O . to atllor taclAty (T&0) _... SID on high Vi6r9F-ion gas transu system averyroa:wra X O[her. Swea m ?.4^ oanmon fie __ baclt(n9 CPP~I+9ow Station ortr to LPC from Ll to fnitiatey repairs on same FSacasslve / inewitle;tont info ®d5 '~-^"~•~"-- ra<®a lnro facnlry t3. Aettoh Taken !o Elitntnate GettBe antl Provart Re0ttprenoo: (CteoclF an4 dvsotibo ae app[ICettla) _~ Smroed / restarts Tic ~ ,~~~ Comprae~or /train d~reesured fieduc®d / Inoratesed irtlot pee rotas _„~. Qarftpleted flare tosgr9g correrrac! EB~I Auowativn / failuro X Carreoyrad F.&I ducwation/Failure at oU~lar faaillgr (1'&p) o.~ ------~- stabilized fiacliary proaesa: and operation Rr~lreq oquipmant dit?Icut[loe with F$cility rrtalntenanoa ctsmpi8ted other. k~a" common line repair unq®rwav Black Srrtok~ Did inoidendCcause Nadc smoke? Yes: ^ No: ~ (If Yes, r:atbrnte with thla aet:tion) Rid inc(dant prasatt a poten~al threat ro human ltsailh or 8afe+MS/t yam; ^ ~..~, (!f Yoe, tspart to FEC ass score as poaalblo. If No, report to AOEC with ?q hours.) p"~ Black smoke emitted from source: (enter tap nUtttbor and descripton) Nop~ied ADEG by Fax cnl Date: resat Report tn. roltoWins -nrormaifion [o AD>=C wttgln 2q hours 9Y FAX(8p7.2B8•y~Qg~'~'..- • _ - -~ QaDte and time of black e3molae evens From: To: Volume flared which eenetated black smoke (if different Pram ahovep `-'- M9GF 6~.3 Description of ertaps to minfmiaa emissions; Sec Suction B, shove. Type of maperial6 burned; ,.--- •----~ ~ Gam -. - 1Vr3Lss: _ Gthe3r. „~ . General Weratf>ar: Air Ttrnlpe,ratu~ W[nd spet~dlDirrotiorl: Name antl ph~te~ numbor of person rnalclr>s the report ~ McLendon ~.8~p Narnb Phone Noy ,,,.~ aaena an ~mormatlon rend belief 1 documern era we, aocurat5 and Ui0 to Pacitlty suporvisor ~ ~ Ante ti3 a cc: EOC Supervisor, Ft8 6 (flare gas and black srrwke ktcGienrs) Field ~nvironnter,t:tt Colt+pGance CoardlnaLOl®, PR@ 7 (Slitck Smotpte inCldetttti only) A@WaPMA Faald Managsr3, (Htaclc sri,ase fnciganta any) GPMA Qperaduns Engineering Technics! Aida, (GPMA rpnly - ATO 47~ Kuparulc Field En~ronmental Compliance Coordirta6ors, NSK 6~ (flare gas and blaex smnks irlcadente) FLARE GAS VENTING REPORT RS ALASKA, INCA • PRIJDHOE BAY/6PI FACILITY; ^;.~ ~; ~:... .. updalod; FEC 9r1>t< ~ - - ---- - - - .. 3pilFQas I~portinp Forn~~eoe flare teeaon~ao Q Jul-28-O1 12:23 From-PRB OPERATIONS 907-659-5061 ~~. FLARE GA5 VENTING REPpR1 fa4111_LIPS nt_ASKA. INC. • PRUDHOE 8AY/GPMA11t • :SAC !'• FACIUTr: ~~~.-: QateofOaruITet-ce; 7/27/201 Ot~ns 17Ven~ (mrNddlyy) (Check Sefeeti0rt) Total volume Flared: 175.45 MSc! 8131.tS Mdte~No: ~ d21. . abili ~pb~d i'~unptanned (Cheek SeieelioN ![.~ulne On~r - Gqs bared was from 0 upeaeam 0 dnra16~1iRR1 (c+rarona) ~7€G tomremrdioter at LPL T-915 P.02/02 F-842 PERMIT NO. .~ _ . ~i9~A~?~ • Tune of O~.Ctrrr'arrFa' )~ 2a•t~o M{P~ From; 20:09 Ta: 2n20 „ = aG:17 From: ~ To. _ _.._-.... From: ^ _, To: .-- From: ~ Ta: ~~ _ ,^._ From: ~ ~ w 'f'o: , Fran: ,~ ^ .~._ Ta Toegl 111inueae Pkro~ a (Mduatos rro(tkrre prod wIrldi gwnerarvd blecksmotaa3 if appCAlblbJ A. Doecripti4n a1 maidens and Cause: (CheoK ss marry As nesaed to ~1Y daar~ibe the ~noiderrt} x s~ r~ 1 eat for t.aw prs T!c sb aua to f1iQh aodrnuat.lernporaturo seat off ayslam aitllatlttes "+ r=~ER~ecvcwsr-urtn4wN .~.. - ~ - - ~,.. Electncd ~ Inslrumen~on malluntnbn ' . ,,,_,_ ~~ EIer.Nical r Instrarrwntamon rrptfunaldn ~.~ a! other taclllry (~d~ ~- Cas trerrsd avstorn aYdpresgure ~„~^ 0acl0ng CP~/Plew Station out Eyoaeamiva / Nsuttlr~nl Inlet qas rates IAty iadtlry S. action Tnkert to Eteminaia Cause and Pr.rr9rltt t9oeuttsltco: (Cnstsk tt4d describe ss appiirat~) X Started / ttestart~ad Y!C # i B01 X ~_ Compressor l train depressuretl Reduced / inCrBased iNet gas rates "~"~ tomptermd tlaro z~stine Corrected Erkl fluctua~on / tatlure C~rreesd ~ fluc0tatiar / taituro at atller facility (TBcq) -„ ~laek Stnolae process upset l0 as ser.+jen d Iacllflty Franng for anawto sgu[dolrm! startup Flsfe aystam tantidp Faulty ShtRdarm an F+-dG1y maprranenoa Hlgh amalant tam SJD on huh vibration oar. Stabilized facility process and oparatiout Repaired equipment diAicultiee witt- Feplity nu-irtbanartee completed D01er: Did ir-cldartt cause l~dc stnoise? Yew ~ P1o: © (lf Yes, continue with thin seotlan) pid Ir~ci+~Pt present s po~ntiel threat t~ human health or safety? Yost D Na: Hl (If Yes. rmport Lo FEC as soon as pOSSttrle. If tea, r®pali to ADEC vlll~ 24 boons.) ~ nU~ a~ de~iphotl~ ~iaclc smoke errtitted from s~pgrce: ¢1 f'o06{2),22P4sxi14,22Pt1OG96~P079 (enter Pla[ift®d ADEC by Fax OTr: Oa4e: Tom: _ Repvr- {91e t•[rllowina iolornralron to ApFC eriarUr 2~i Ironic BY Fe7C(gpT-26A'79oe~ bate artd dme of black tnrotoe eVenl- F:rorn: 7/27/200'120:0.1 Ta 9!27/2001 20:17 Volume flared which generated plaek srttoke ~f diltaranf frgtrt Shove): 175.45 I~ASCF ~BBLS Description of steps m minimize arrisatcrts: See Seollw- B, above, , Type Pf materlele purned: ~: X ~'~ ~~' General Weather: AirTemperaaro: 80 Wind Speed/0ireotktt: ~-101E Name and phon® rwtnber of per6on making the report S t35s-!'l~99 Narf16 Phcr~ N)o. Based on irrformatlan and bell rmetl af0ar rBasnnadle a~uiry, I certify toot the statements and informddon in and atracttad ~ 0~is doeumerrt are eve, accords nd eomp<ore, ~-7 -~ Q Raoility Superwaot ~ Date i~ oY~'~ or, EtJC SupOtvl:.or, PRB 6 (tiara gas arts b18Ck SmOka ir-cidanos) Fiala ¢rwiranmenta! Compliance coordlriamts, PRB 7 (f3latik Smoke inGidenls only) PF3t~-GPMA Feld Mattngr3, (Bia~ek snwlca inaidenDs or>ly) GPMA Oparatiorie Fa'igineetirp Yaohnk;si dicta, (GiPMA reports ~ - ATO 477) Kuperulc F'~eld Ernfironmentat Complrance Coardlriators. N~IC Bf (lla~~re gas and bau~c smolaa irwid®nfa) Updated: F€C 91E4D '° Sci1t-CRw I~padn0 Fannavruasar Aua-22-O1 12:41pm From-FLOW 3 +907-659-5599 T-162 P.O1/O1 F-683 FLARE GAS VENTING REPORT PHILLIPS ALASKA INC. • PRUDHOE BAYlGPf1AA/KUPARUK FACILfiK - FS3___ __ __ PERti111T NO. GAS ~IsPOSrrroN ' Dat9ofOceurrence: 081?~,.(4! ~frare Avant Time of4eeurrence: , (mm/dd/yy) (Check Selection) Qp;pQ 24:~ (mutes From: / A~ To: ~^ _ /¢ Total Volume Flared: la gl 7 ('MSC BBIS From' lZ~a Tc: ~ = 2c7 ~/ From: To: _ fMl+"ter No,: 7U B Fdcillt Q Planned ~Pl From: To: ~_ - _ (Ctreek Selection} From: _ To: From: To: - Total trlirtutot Flared: - 3 ~ _'`~/ (LiSbur»t) t'7nly -Gas floret was from f] upstream O pournetream (crook erne) ~ (lndudes vohun® Bared which greri~rt~ il~adFar-~I ~. o/ TEG contactor meter ar LPC) if epp(~b/g) 1•• L t 1I A. Descrpton ~ Ineitlottt antl Cauoa' (Check as many ae n•etletl to fully tlsserlbe the Ineldenq . A I If°_ ~ ~{tilt~[ slo TlCa for PMOass upset In f'1U V , V V i T/C SD due to ttigh exhaust temperature section d locally seal oD system dlfllraritles ~ Flartrrg for aA~~i~-~+(dGn6. C~Q(lll>fNB~&IQfI ~.~,[,...._ EMERGENCY SHUTQOVwv Fiore system tasting Anchar~~e N~ Electrical / ktstrumernation malfunction ~~- Fauhy shutdown an .-~~_._...~ Eiearteal/ InstNmontatlon malfunFUtm Facility maiMtxtanoe hligh ambient temperatures. at other facility Rrtp) - - -- - SID on nigh vibration Gas transit system overptessura ~ Othar~ ,,.~ ~~ backing f,`PFlFtow Station tut a e Excessive / Ineufflclent Inlet gas LfiS~fY/17 '- oA rrtalf~1 rates into facility R_ gctlon Taken to eliminate cause antl PreYent t3eeurrenee~ (Ctteok and describe ea appucebie) Started I restarted T!C p ___ _ _ S(abiiize~I idcilitY process and operetion Compressor / !rain depressurod Repaired equipment difficuRiea Reduced !increased iMet gas rates with Completed flare tesdng Facility maintenance campt®teq .__._~ Corrected E&1 fluctuation /failure ~ Outer. .~ ~.~~/~~'' Corrected E&I fluctuation /failure Lt3dv e - ~+ at other !edify (T&D) _ _ Black Smdke Did ineidont cause black smoke9 Yes ~) No: f.7 (tf Yes, cendnue with this section) Did incident present a potential threat to human health or safety? Yea: (~ N0: ~ (If Yes, rmpott to FEC as soon ea posoible_ If Ne, report to ADEC with 24 hours.) Black smoke emitted from sourc®: ~ 44 V s'~s7~-46~P~u4fc6 (enter tag number and descrfptior-) ,~,f l Notified ADEC by Fax on: Date: lr Tama: /Z:S~1,~>Cc{' ~.tl'4er1~/ ,t'`'a/~q~ Report the fogowing i~ormation to AUE In 24 houre,B„1~,FAX (9h7-2b8~7SO8): Date and time of black smoke event: From:$[JZ2~a l f~-SvAM To: f} ~P ~t,roe~,l 'n'7t°~.- ro r~t~ar~eS Volume Bared which generated black smoke (if dit(erettt from strove): C~ MSCF ,,,~BBLS Description 01 steps to minimize emissrorts: See Section A, above, Typo of materials burned: teas: t,/' NGl_s: Other: General Weather: Air Temperature: ~ Wind S aed/ ~rectio : Q _ ~ ~ ~itf Nar»e and phone number of person making the report: S~LtG. C rO R ~ ts-~ 7 ~ ~ "~' Name Phone No. Based on Infermatian and belief formed after reasonable inquiN, I t:eAlty !hat the statements and ktfermation in and attached -o this document era true, accurate and come Facility Supervisor Date ~ ~„~ d cc: EOC Supervisor, PRB 8 (flare as and black smoke inciderrta} Field l:rnrironmental Compliance Coordinators, PRB 7 (Black Smoke incdents only) PBU/GPMA Field Managers, (Black amaka incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only • ATO 477) Kuparuk: Field Environmental Gomplianoe Coordinators, NSK fit (flare gas and back smoke incidents) Upo®rec; PEC area P, \Graups 1f:nvhanrnantol \FOnYIS\ SpAFGOafleporting forma\flare bas vorxinb Font19-981.~s ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ~LISBURNE PRODUCTION CENTER #1 ABP EXPLORATION, ALASKA ~PRUDHOE BAY/PT MCINTYRE ~ 08/2001 ~ Disposition Volume MCF* 1. Sold 129,454 2. Reinjected 7,787,195 3. Flared or vented less than 1 hour. 1,022 4. Flared or vented greater than 1 hour 0 (Sup lemental re ort required--See 20 AAC 25.235) 5. Pilot and Purge 12,231 8$ U'ya 6. Used for lease operations Fuel 821,154 Assist 59,588 7. Other Lift Gas, Off Field 236,696 TOTAL items 1 - 7 9,047,340 8. NGL gas equivalent produced 129,454 9. Purchased gas 0 ~:' j 10. Transferred from: ~;,~, ~, R 0 11. Transferred to: wce. ~ '~° 0 ,. Remarks: ~'° ~; true and correct to the best of my knowledge. I hereby ce that t foregoing~s f Signature: nJ~ Title: NbN (~Q.. `C~ck Date: °t ~b Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 38.16% 4.35% N_PRUDHOE 640152 0.00% PTMAC W BEACH West Niakuk 666100 640186 640149 56.04% 0.00% 1.45% Official Use Onl --Fla[in Authorization'> 1 hr. i. Safety ,~f 2. Lease Use ~ MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~f~v ~o/ ti BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/9/2005 1649-1657 0 Startup test on 4930 compressor Planned Finished tests 8/10/2005 4 (17 Intermitte 0 Startup test on 4930 compressor Planned Finished tests 8/11/2005 3 (14 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 8/12/2005 1 (19 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 8/13/2005 8 (37 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 8/14/2005 9 (35 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 8/25/2005 1649-1709 86 Compressor 1801 shutdown due to a bad monitor Unplanned Corrected failure and restarted compressor 1801 Total Flare <- 1 Hour. 86 Total Flare > 1 Hour 0 Volume Flared 86 Measured Safety Pilot 4,675 ~ Continuous Assist 22,057 TOTAL FLARED 26,818 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 08/09/05 1649-1657 50 Startup test on 4930 compressor Planned Finished tests 08/10/05 4 (17 Intermitte 59 Startup test on 4930 compressor Planned Finished tests 08/11/05 3 (14 Intermitte 21 Startup test on 1830 compressor Planned Finished tests 08/12/05 1 (19 Intermitte 113 Startup test on 1830 compressor Planned Finished tests 08/13/05 8 (37 Intermitte 339 Startup test on 1830 compressor Planned Finished tests 08/14/05 9 (35 Intermitte 235 Startup test on 1830 compressor Planned Finished tests 08/25/05 1649-1709 108 Compressor 1801 shutdown due to a bad monitor Unplanned Corrected failure and restarted compressor 1801 Total Flare <= 1 Hour 925 Total Flare > 1 Hour 0 Volume Flared 925 Measured Safety Pilot 6,839 ~. Continuous Assist 33,921 TOTAL FLARED 41,885 w 8P EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 08/09/05 1649-1657 0 Startup test on 4930 compressor Planned Finished tests 08/10/05 4 (17 Intermitte 0 Startup test on 4930 compressor Planned Finished tests 08/11/05 3 (14 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/12/05 1 (19 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/13/05 8 (37 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/14/05 9 (35 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/25/05 1649-1709 0 Compressor 1801 shutdown due to a bad monitor Unplanned Corrected failure and restarted compressor 1801 Total Flare <- 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 08/09/05 1649-1657 0 Startup test on 4930 compressor Planned Finished tests 08/10/05 4 (17 Intermitte 0 Startup test on 4930 compressor Planned Finished tests 08/11/05 3 (14 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/12/05 1 (19 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/13/05 8 (37 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/14/05 9 (35 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/25/05 1649-1709 0 Compressor 1801 shutdown due to a bad monitor Unplanned Corrected failure and restarted compressor 1801 Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 a BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 08/09/05 1649-1657 0 Startup test on 4930 compressor Planned Finished tests 08/10/05 4 (17 Intermitte 0 Startup test on 4930 compressor Planned Finished tests 08/11/05 3 (14 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/12/05 1 (19 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/13/05 8 (37 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/14/05 9 (35 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/25/05 1649-1709 8 Compressor 1801 shutdown due to a bad monitor Unplanned Corrected failure and restarted compressor 1801 Total Flare <- 1 Hour 8 Total Flare > 1 Hour 0 Volume Flared 8 Measured Safety Pilot 537 Continuous Assist 2,700 ~ TOTAL FLARED 3,245 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 08/09/05 1649-1657 0 Startup test on 4930 compressor Planned Finished tests 08/10/05 4 (17 Intermitte 0 Startup test on 4930 compressor Planned Finished tests 08/11/05 3 (14 Intermitte 0 Startup test on 1$30 compressor Planned Finished tests 08/12/05 1 (19 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/13/05 8 (37 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/14/05 9 (35 Intermitte 0 Startup test on 1830 compressor Planned Finished tests 08/25/05 1649-1709 3 Compressor 1801 shutdown due to a bad monitor Unplanned Corrected failure and restarted compressor 1801 Total Flare <- 1 Hour 3 Total Flare > 1 Hour 0 Volume Flared 3 Measured Safety Pilot 180 ~, Continuous Assist 910 TOTAL FLARED 1,093 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION LISBURNE PRODUCTION CENTER #1 ~BP EXPLORATION, ALASKA ~PRUDHOE BAY/PT MCINTYRE Disposition Volume MCF* 1. Sold 123,385 2. Reinjected 7,517,874 3. Flared or vented less than 1 hour. 1,533 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 7,193 5. Pilot and Purge 11,744 6. Used for lease operations Fuel Assist 776,676 6,201 7. Other Lift Gas, Off Field 251,827 TOTAL items 1 - 7 8,696,433 8. NGL gas equivalent produced 123,385 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby certify that the f/o~regoing is true and correct to the best of my knowledge. Signature:~~~ F ~~•-~++'~... Title: V''~ • ~ . Date: (0 " ( - 0 Form 10-422 (RevisAal4/95) 09/2001 "Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 36.14% 5.01% N_PRUDHOE 640152 0.00% PTMAC W BEACH West Niakuk 666100 640186 640149 57.56% 0.00% 1.29% Official Use Onl --Flarin Authorization > 1''hr. ~- I ~~ 1. Safety 3S L~-~bX~') MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ~r '' 1~ ~ " ~.. ~ ~ cs ~ i Commiss er Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/21/2001 1233-1300 88 Shutdown Compressor 1801-process upset 9/22/2001 0141-2317 Intmnt 203 Compressor 1807 shutdown for maintenance & inspection 9/23/2001 0025-0913 Intmnt 135 Compressor 1807 & 1808 shutdown for maintenance & inspection 9/30/2001 1241-1255 51 Shutdown Compressor 1801-assist gas valve problem Total Flare <= 1 Hour 477 9/23/2001 0943-1408 2,885 Gas process upset at LPC Total F/are> 1 Hour 2,885 Volume Flared 3,362 Unplanned Stabilized process & restarted compressor Planned Restarted after maintenance & inspection Planned Restarted after maintenance & inspection Unplanned Corrected problem and restarted compressor Unplanned Fieldwide shutdown completed to prevent flaring Measured Safety Pilot 4,171 Continuous Assist 2,262 TOTAL FLARED 9,795 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 09/21/01 1233-1300 136 Shutdown Compressor 1801-process upset Unplanned Stabilized process & restarted compressor 09/22/01 0141-2317 Intmnt 501 Compressor 1807 shutdown for maintenance & inspection Planned Restarted after maintenance & inspection 09/23/01 0025-0913 Intmnt 190 Compressor 1807 & 1808 shutdown for maintenance & inspection Planned Restarted after maintenance & inspection 09/30/01 1241-1255 60 Shutdown Compressor 1801-assist gas valve problem Unplanned Corrected problem and restarted compressor Total Flare <= 1 Hour 887 09/23/01 0943-1408 4,073 Gas process upset at LPC Total Flare > 1 Hour 4,073 Volume Flared 4,960 Unplanned Fieldwide shutdown completed to prevent flaring Measured Safety Pilot 8,813 Continuous Assist 3,548 TOTAL FLARED 15,321 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 ATE IME OLUME (MSCF) PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-01 DESCRIPTION OF INCIDENTS & CAUSE LANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 09/21/01 1233-1300 0 Shutdown Compressor 1801-process upset Unplanned Stabilized process & restarted compressor 09/22/01 0141-2317 Intmnt 0 Compressor 1807 shutdown for maintenance & inspection Planned Restarted after maintenance & inspection 09/23/01 0025-0913 Intmnt 0 Compressor 1807 & 1808 shutdown for maintenance & inspectic Planned Restarted after maintenance & inspection 09/30/01 1241-1255 0 Shutdown Compressor 1801-assist gas valve problem Unplanned Corrected problem and restarted compressor To tal Flare <= 1 Hour 0 09/23/01 0943-1408 0 Gas process upset at LPC Unplanned Fieldwide shutdown completed to prevent flaring 0 0 0 0 0 0 Total Flare > i Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 09/21/01 1233-1300 0 Shutdown Compressor 1801-process upset Unplanned Stabilized process & restarted compressor 09/22/01 0141-2317 Intmnt 0 Compressor 1807 shutdown for maintenance & inspection Planned Restarted after maintenance & inspection 09/23/01 0025-0913 Intmnt 0 Compressor 1807 & 1808 shutdown for maintenance & inspectic Planned Restarted after maintenance & inspection 09/30/01 1241-1255 0 Shutdown Compressor 1801-assist gas valve problem Unplanned Corrected problem and restarted compressor Total Flare <- 1 Hour 0 09/23/01 0943-1408 0 Gas process upset at LPC 0 0 0 0 0 0 Unplanned Fieldwide shutdown completed to prevent flaring Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 09/21/01 1233-1300 14 Shutdown Compressor 1801-process upset Unplanned Stabilized process & restarted compressor 09/22/01 0141-2317 Intmnt 104 Compressor 1807 shutdown for maintenance & inspection Planned Restarted after maintenance & inspection 09/23/01 0025-0913 Intmnt 9 Compressor 1807 & 1808 shutdown for maintenance & inspection Planned Restarted after maintenance & inspection 09/30/01 1241-1255 5 Shutdown Compressor 1801-assist gas valve problem Unplanned Corrected problem and restarted compressor Total Flare <= 1 Hour 132 09/23/01 0943-1408 194 Gas process upset at LPC Unplanned Fieldwide shutdown completed to prevent flaring Total Flare > 1 Hour 194 Volume Flared 326 Measured Safety Pilot 602 Continuous Assist 312 TOTAL FLARED 1,240 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 09/21/01 1233-1300 4 Shutdown Compressor 1801-process upset Unplanned Stabilized process & restarted compressor 09/22/01 0141-2317 Intmnt 30 Compressor 1807 shutdown for maintenance & inspection Planned Restarted after maintenance & inspection 09/23/01 0025-0913 Intmnt 2 Compressor 1807 & 1808 shutdown for maintenance & inspection Planned Restarted after maintenance & inspection 09/30/01 1241-1255 1 Shutdown Compressor 1801-assist gas valve problem Unplanned Corrected problem and restarted compressor Total Flare <- 1 Hour 37 09/23/01 0943-1408 41 Gas process upset at LPC Total Flare > 1 Hour 41 Volume Flared 78 Measured Safety Pilot 158 Continuous Assist 79 Unplanned Fieldwide shutdown completed to prevent flaring TOTAL FLARED 315 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Fields} Month/Year of Disposition LISBURNE PRODUCTION CENTER #1 BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE 10/2001 Disposition Volume MCF' 1. Sold 133,338 2. Reinjected 9,341,365 3. Flared or vented less than 1 hour. 3,195 4. Flared or vented greater than 1 hour 3,916 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 12,316 6. Used for lease operations Fuel 902,265 Assist 113,050 7. Other Lift Gas, Off Field 216,986 TOTAL items 1 - 7 10,726,431 8. NGL gas equivalent produced 133,338 ~ 9. Purchased gas ~ '~ 0 1 „ ~~ 10. Transferred from: ~ ~,,a ~ 0 11. Transferred to: ~ c°a 0 Remarks: ~. I hereby cer ti f y that the f oregoing is true and correct to the best of my kknowledge. ,t J ~ ~ / Signature:f QG~.~._w.~ + ~~1~t..~.J1eati. n _ Title: w'~ • Date: ~ ~ w a~ Form 10-422 (Revis~tl 4/95) 'Indicate contribution of each pool to total. Pool Name Code Percent LISBURNE NIAKUK 640144 640148 50.61% 4.79% N_PRUDHOE 640152 0.00% PTMAC W_BEACH West Niakuk 666100 640186 640149 43.50% 0.00% 1.09% Official Use Only--Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use ~G~ f+ I_ MCF 3. Conserv. Purposes MCF r Commissi er Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/3/2001 2236-2243 2 1855 offgas compressor shutdown on high vibration Unplanned Stabilized process and restarted compressor 1855 10/4/2001 0305-0317 21 1855 offgas compressor shutdown, process upset in NGL plant Unplanned Stabilized process and restarted compressor 1855 10/11/2001 1112-2232 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/2001 0109-0124 78 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/2001 0305-0318 65 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/2001 0808-2103 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/15/2001 1557-1601 0 FOR startup attempt Planned Startup attempt ended for the day 10/16/2001 1429-2106 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/18/2001 0215-0217 2 1855 offgas compressor shutdown, no apparent cause Unplanned Stabilized process and restarted compressor 1855 10/19/2001 1518-1639 (intermittent) 0 FOR startup compressor 1830 Planned 1830 compressor on line 10/21/2001 0548-1704 198 Shutdown compressor 1801. Electrical/Instumentation malfunction Unplanned Restarted compressor 1800 10/23/2001 0253-0318 0 Shutdown compressor 1830 Unplanned Stabilized process and restarted compressor 1830 10/26/2001 1057-1144 0 Shutdown compressor 1830, process upset in MI section Unplanned Compressor left down for repair 10/27/2001 1545-2049 (intermittent) 0 Shutdown compressor 1830, process upset in FOR process Unplanned Restarted compressor 1830 Total Flare <= 1 Hour 366 10/12/2001 0746-0124 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/2001 0943-0954 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/17/2001 1236-2009 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/25/2001 0343-1500 0 Shutdown compressor 1830, process upset in FOR process Unplanned Stabilized process and restarted compressor 1830 Total Flare > 1 Hour 0 Volume Flared 368 Measured Safety Pilot 6,671 Continuous Assist 71,280 ~.i s ~aurt't~e., TOTAL FLARED 78,317 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/03/01 2236-2243 1 1855 offgas compressor shutdown on high vibration Unplanned Stabilized process and restarted compressor 1855 10/04/01 0305-0317 18 1855 offgas compressor shutdown, process upset in NGL plant Unplanned Stabilized process and restarted compressor 1855 10/11/01 1112-2232 (intermittent) 271 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0109-0124 58 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/01 0305-0318 51 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/01 0808-2103 (intermittent) 304 FOR startup attempt Planned Startup attempt ended for the day 10/15/01 1557-1601 60 FOR startup attempt Planned Startup attempt ended for the day 10/16/01 1429-2106 (intermittent) 902 FOR startup attempt Planned Startup attempt ended for the day 10/18/01 0215-0217 2 1855 offgas compressor shutdown, no apparent cause Unplanned Stabilized process and restarted compressor 1855 10/19/01 1518-1639 (intermittent) 263 FOR startup compressor 1830 Planned 1830 compressor on line 10/21/01 0548-1704 184 Shutdown compressor 1801. Electrical/Instumentation malfunction Unplanned Restarted compressor 1800 10/23/01 0253-031 g 166 Shutdown compressor 1830 Unplanned Stabilized process and restarted compressor 1830 10/26/01 1057-1144 33 Shutdown compressor 1830, process upset in MI section Unplanned Compressor left down for repair 10/27/01 1545-2049 (intermittent) 472 Shutdown compressor 1830, process upset in FOR process Unplanned Restarted compressor 1830 Total Flare <= 1 Hour 2,785 10/12/01 0746-0124 (intermittent) 1,274 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0943-0954 (intermittent} 1,477 FOR startup attempt Planned Startup attempt ended for the day 10/17/01 1236-2009 (intermittent) 415 FOR startup attempt Planned Startup attempt ended for the day 10/25/01 0343-1500 750 Shutdown compressor 1830, process upset in FOR process Unplanned Stabilized process and restarted compressor 1830 P~infi ~YI~, GS~C~) ~ Total Flare> 1 Hour 3,916 Volume Flared Measured Safety Pilot Continuous Assist 6,701 4,921 36,367 3q I b ~u'~u~-- TOTAL FLARED 47,989 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/03/01 2236-2243 0 1855 offgas compressor shutdown on high vibration Unplanned Stabilized process and restarted compressor 1855 10/04/01 0305-0317 0 1855 offgas compressor shutdown, process upset in NGL plant Unplanned Stabilized process and restarted compressor 1855 10/11/01 1112-2232 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0109-0124 0 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/01 0305-0318 0 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/01 0808-2103 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/15/01 1557-1601 0 FOR startup attempt Planned Startup attempt ended for the day 10/16/01 1429-2106 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/18/01 0215-0217 0 1855 offgas compressor shutdown, no apparent cause Unplanned Stabilized process and restarted compressor 1855 10/19/01 1518-1639 (intermittent) 0 FOR startup compressor 1830 Planned 1830 compressor on line 10/2i/01 0548-1704 0 Shutdown compressor 1801. ElectricaUlnstumentation malfunctic Unplanned Restarted compressor 1800 10/23/01 0253-0318 0 Shutdown compressor 1830 Unplanned Stabilized process and restarted compressor 1830 10/26/01 1057-1144 0 Shutdown compressor 1830, process upset in MI section Unplanned Compressor left down for repair 10/27/01 1545-2049 (intermittent) 0 Shutdown compressor 1830, process upset in FOR process Unplanned Restarted compressor 1830 Total Flare <= 1 Hour 0 10/12/01 0746-0124 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0943-0954 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/17/01 1236-2009 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/25/01 0343-1500 0 Shutdown compressor 1830, process upset in FOR process Unplanned Stabilized process and restarted compressor 1830 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot Continuous Assist TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/03/01 2236-2243 0 1855 offgas compressor shutdown on high vibration Unplanned Stabilized process and restarted compressor 1855 10/04/01 0305-0317 0 1855 offgas compressor shutdown, process upset in NGL plant Unplanned Stabilized process and restarted compressor 1855 10/11/01 1112-2232 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0109-0124 0 Shutdown compressor 1801 on high vibration Unpianned Restarted compressor 1801 10/14/01 0305-0318 0 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/01 0808-2103 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/15/01 1557-1601 0 FOR startup attempt Planned Startup attempt ended for the day 10/16/01 1429-2106 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/18/01 0215-0217 0 1855 offgas compressor shutdown, no apparent cause Unplanned Stabilized process and restarted compressor 1855 10/19/01 1518-1639 (intermittent) 0 FOR startup compressor 1830 Planned 1830 compressor on line 10/21/01 0548-1704 0 Shutdown compressor 1801. Electrical/Instumentation malfunctic Unplanned Restarted compressor 1800 10/23/01 0253-0318 0 Shutdown compressor 1830 Unplanned Stabilized process and restarted compressor 1830 10/26/01 1057-1144 0 Shutdown compressor 1830, process upset in MI section Unplanned Compressor left down for repair 10/27/01 1545-2049 (intermittent) 0 Shutdown compressor 1830, process upset in FOR process Unplanned Restarted compressor 1830 Total Flare <- 1 Hour 0 10/12/01 0746-0124 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0943-0954 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/17/01 1236-2009 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/25/01 0343-1500 0 Shutdown compressor 1830, process upset in FOR process Unplanned Stabilized process and restarted compressor 1830 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot Continuous Assist TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 VOLUME PLANNED DATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/03/01 2236-2243 0 1855 offgas compressor shutdown on high vibration Unplanned Stabilized process and restarted compressor 1855 10/04/01 0305-0317 1 1855 offgas compressor shutdown, process upset in NGL plant Unplanned Stabilized process and restarted compressor 1855 10/11/01 1112-2232 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0109-0124 7 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/01 0305-0318 6 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/01 0808-2103 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/15/01 1557-1601 0 FOR startup attempt Planned Startup attempt ended for the day 10/16/01 1429-2106 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/18/01 0215-0217 0 1855 offgas compressor shutdown, no apparent cause Unplanned Stabilized process and restarted compressor 1855 10/19/01 1518-1639 (intermittent) 0 FOR startup compressor 1830 Planned 1830 compressor on line 10/21/01 0548-1704 20 Shutdown compressor 1801. Electrical/Instumentation malfunction Unplanned Restarted compressor 1800 10/23/01 0253-0318 0 Shutdown compressor 1830 Unplanned Stabilized process and restarted compressor 1830 10/26/01 1057-1144 0 Shutdown compressor 1830, process upset in MI section Unplanned Compressor left down for repair 10/27/01 1545-2049 (intermittent) 0 Shutdown compressor 1830, process upset in FOR process Unplanned Restarted compressor 1830 Total Flare <- 1 Hour 34 10/12/01 0746-0124 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0943-0954 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/17/01 1236-2009 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/25/01 0343-1500 0 Shutdown compressor 1830, process upset in FOR process Unplanned Stabilized process and restarted compressor 1830 Total Flare > 1 Hour Volume Flared 34 Measured Safety Pilot 590 Continuous Assist 4,390 TOTAL FLARED 5,014 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/03/01 2236-2243 0 1855 offgas compressor shutdown on high vibration Unplanned Stabilized process and restarted compressor 1855 10/04/01 0305-0317 1 1855 offgas compressor shutdown, process upset in NGL plant Unplanned Stabilized process and restarted compressor 1855 10/11/01 i 112-2232 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0109-0124 2 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/01 0305-0318 2 Shutdown compressor 1801 on high vibration Unplanned Restarted compressor 1801 10/14/01 0808-2103 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/15/01 1557-1601 0 FOR startup attempt Planned Startup attempt ended for the day 10/16/01 1429-2106 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/18/01 0215-0217 0 1855 offgas compressor shutdown, no apparent cause Unplanned Stabilized process and restarted compressor 1855 10/19/01 1518-1639 (intermittent) 0 FOR startup compressor 1830 Planned 1830 compressor on line 10/21/01 0548-1704 5 Shutdown compressor 1801. Electrical/Instumentation malfunction Unplanned Restarted compressor 1800 10/23/01 0253-0318 0 Shutdown compressor 1830 Unplanned Stabilized process and restarted compressor 1830 10/26/01 1057-1144 0 Shutdown compressor 1830, process upset in MI section Unplanned Compressor left down for repair 10/27/01 1545-2049 (intermittent) 0 Shutdown compressor 1830, process upset in FOR process Unplanned Restarted compressor 1830 Total Flare <= 1 Hour 10 10/12/01 0746-0124 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/13/01 0943-0954 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/17/01 1236-2009 (intermittent) 0 FOR startup attempt Planned Startup attempt ended for the day 10/25/01 0343-1500 0 Shutdown compressor 1830, process upset in FOR process Unplanned Stabilized process and restarted compressor 1830 Total Flare > 1 Hour Volume Flared 10 Measured Safety Pilot 134 Continuous Assist 1,013 TOTAL FLARED 1,157 Nov-16-O1 14:29 From-PRB OPERATIONS 907-659-5061 FLARE GAS VENTING REPORT rSKA, INC. • PRUDMOE BAY/GRMA/KUPARUK FACILt7Y: • t.PG T-159 P.27/27 F-274 PERMIT NO. ~ 9A'7"S-AAD25 ~~ Date of Occurrence: 10!3/2001 ^ Flare ^ vent Tlme of Qceurrenee: (mm/aaryy) (Chock Selection) 00:00 2a:00 Minutes From: 22:3!3 To: 22:43 = QO:07 7ota1 Volume Flared: 2.94 MSCF BBLS Fram: To: _ -'-" From: To: _ Meter )~o.r 621 B F#ai I ^ Planneq ^ Unplanned From, To: (ChecK Sel®ction) From: To: From: 70: _ Total Minutes Flared: - r)0~07 - ~ (Lisburne Qnly -Gas flared was from Q upstream ^ downstream (Cneok one) {Includes Volume flared whiCfl generated black smoke, of T1=~a conraator met®rat SAC) if applicable) A, peacrlption of Incitlent and Cause: (Check as many as noetlotl to fully deseribo the incident) 5rD T/Cri for X Process upset in NGL 7/C SP due to high exhaust temperature section of laclllty Seal oil system dlrylcultlaa Flaring for tlriilaite ahutdown /startup EMERGENCY SHUTDOWN Flare System testing Elactrlcel / Instn,monlation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient temperatures. at otn®r lacillty (T&D) S/D on high vibration Gas transit system overprassuro X Other: 1855 Offgas Comp, shutdown bacKing CPFlFIow Station out Excessive ! insufticiont inlaz gee rates into IaCillty - p. Acdon Taken to Ellminate Cause and Prevent Recurrence: (Check and describe as appl icable) Started / restarted T/C # X Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet gas rates with Completed flare tasting Facility maintenance complet®d Corrected E&I fluctuation /failure X Other: FtAStartad t 855 Offgas Comp• Corrected E&I fluctuation /failure at other f&cility (7&Q) Black Smoke Qid incident cause black smok®? Yes: ^ No: Q (If Yes, continue with this section) Did incident present a potentiaE threat to human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible. tf No, report to AEC with 24 hours.) Black smoke emitted from souroe: (enter tag number and d®scription) Notified ADEC by Fax on: Date: Time: Report the following Information to ApEC within 24 hours BY FAX {90T-289-7ti06); Date and time of black smoke event: From: Yo: Volume flared which generated black smoke (if different from above); MSCF BBtS Description of st®ps to minimize emissions: See Section S, above. Type of materials burned: Gas: X NGLs; Other: G®neral Weather: Air T mparatur®: _ Wind Speed/Diraction: Name and phone number of parson maki~g the rep~i : Elliott Wobb '' II 1 Name t3asea on rntormatian and Dauer document are true, accurate and Facll[ty Supervisor and information in Date __~0" ~ ~'~ t{ _ 807-659-8660 Phone No. cc: EOC Supervisor, P t3 (flare gas and black smokm Incidents) Field Environments mpliance Coordinators, PRB 7 (Slack Smoke incidents only) P[3U/GPMA Field a agars, (81aek smoke incidents only) GPMA Operations En Ineering Technical Aide, (GPMA reports only - ATO 477} Kuparuk: Fiettl En ~ o mentaE Compliance Coordinators, NSK 6t (flare gas and black smoke incidents) Opcatad: FEC 6198 p:lf3raupslEnvironmenLanPorms\ SpiIl~Gsa Reporting Fosm:110o3otflare report BS Nov-16-O1 14:29 From-PRB OPERATIONS 907-659-5061 T-159 P.26/27 F-274 FLAR1r GAS VENTING RPPOR7' PHILLIRS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: ~ LRG PERMIT NO. ' ' aA73-AA02~ Date of occurrence: _ 10/4J2401 n Flare ^vent (mm/dd/yy) (Ch®ck Selection) Total Volume Flared: 41.2 MSCf' 68LS Meter No.: ti~1. ~ B Facilit ^ Planneo ^ unplannea (Check Selection) (Lisburne Only - Qas flared was from ~ upstream ^ Qownsiream (Cj~eck one) of 7EG contactor moiBr at i.PC) From: From: From: From: From: From: Ti of occurrence: 00:00 24:0 Mlnutes 03:05 To: 03:17 = 00:12 To: To: ~'~' T To: _ To; _ To; _ Total Mlnutes Flared: - 00:12 (InCluass volume flared which generated black smoke, rf apprr'cablo~ A- Description of Incident and Cause: (Chock as many as needed to fully tleserlbe the Incident) S!D T/Ctr for X T/C SD due ca high exhaust temperature Seal oil system ditticultles EMERGENCY SHUTDOWN Electrical I Instrumentation malfunmion Electrical /Instrumentation malfunction at outer facility R&D) Gas transit system overpressure X backing CPF/Flow Station out Excessiv®/insufficient Inlet gas rates Into facility Process upset in NGL section of facility Flaring for drillsite snutaown ! starlup Flare system testing Faulty SnUtgawn on Facility maintenanc® High ambient temperatures. S/D on hlgn vibration Other: 1855 Offgas Comp. shutdown__ B. Action Taken to Eliminate Cause and Prevost Recurrence: (Check end describe as applicable) Started /restarted T/C # X Stabilized facility process and operation Compressor/ train tlepr95suretl Repaired equipment dlfficu-ties Reduced / inoreased Ingot gas rates with ~' Gompleteq fiar® iestinq Facility maintenance completed Corrected f=&1 fluctuation /failure X Other: FiestaRad 1855 Oftgas Comp. Corrected E&I fluctuation /failure at other facility R&D) Black Smoke Did incident cause black smoke? Yos: ^ No: Q (If Yes, continua with this section) piq Incident present a potential throat to human health or 6afety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible. If fao, report to ADEC: with 24 hours.) Black smoke emltt®d from source: (enter tag numpQr and description) Notifietl ADEC by Fax on: pate: Time: Report the following Information to ADEC within 24 hours SY (907-268-7508): Date and lima of black smoko event: From: To: Volume flared whim generated black smoke (if different from above): MSCF ~ BBLS Description of steps to minimize emissions: S®e Section B, above. Type of materials burned; Gas: X NGLs: Other: GAneral Weather: Alr Temperature: Wind Speedlpirection: Name and phone number of person making the repo Elliott Webb n Name Based On inrormatbn and belief 1 document are true, accurate and Facility Supotvlsor I certify that Date lQ~~~-o~ 907-659-86fi0 Pnone No. tnis cc: EOC Supervisor, PRB (flare case and black smoko Incidents) Field Environmental o pliance Coordinators, PR8 7 (t31acK Smoke Incidents only) PBU/GPMA Field Ma ag rS, (Black smoke incidents only} GPMA Operations En Bring Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) P:1Groupa~EnvkonmentaAFOrme\ Updatoq: FBC 8188 Spill-bas Raportm8 Fosm.~icoa0ifiare report B5 Nov-16-O1 14:28 From-PRB OPERATIONS 907-659-5061 T-159 P.22/27 F-274 FLARE GAS VENTING REPORT SKA. INC_ ~ PRUDHOE BAY/GPI FACILITY: I:,P~ ~ ~i pERM1T Nt?. 9A73,AAR2S Pate of Occurrence: 10/11/2001 ~ Plaro ^Vent Time of OccurrenCa: (mmladlyy) (Check Selection) 00:00 Minutes From: 11:12 To: 11:17 = 00;05 Total Volume Fared: 271.41 MSCF BBLS From: 12:50 To: 13:01_ = 00:11 From: 14;09 To: 14:12 =. 00;03 MaterM4•: 621 A Faeilit Ot'lannea ^unplanned From: 14:31 To; 14:39 = OD:Oa (ChccK Selection) From: 14:47 To: _14:48 = 00:07 From: 15:13 To: 15:14 00:01 Total Minutes Flared; ~ 00:25 (Lrs,bumA only ~ Gas flared was from^ upstream D downstream (Check One) of TECv confactor ntstor at LPC) (Includes volumo flared welch generated bladr smoke, !f applicable) A. Description of Ineitl®nt and Cause: (Check as many as Headed to fully describe the incident) S/D T/C# for Process upset in T/C 5D duo to nigh oxhaust temperature section of facility Seal oil system difficulties Flaring for grillsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Electrical / Instrumentation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintananeca High ambient temperatures. at other fdollily (T&D) Gas transit system overpressure packing CPF/Flow Station out Excessive ! insuificier<t inlat gas rates into facility X Other FOR startup attempt. Intermittent -_ florin for a total of 51 minutes. Page 7 of.4 B. Action Taken to Elttnlnate Cause and Prevent Recurrence: (Check and describe as applicable} Started /restarted T/C # Stabilised facility process artq operation Compressor / train tloprossurcd Repaired equipment difficulties .~. Reduced /increased inlet gas rates with Comps©tea flare testing Facility mainkenanee completed Corrected E&I iluctuatlon /failure X Other: Startup attempt ended for file day Corrected E81 fluctuation /failure ~ __ at other facility (T&D) Did incident cause biacK smoke? Yes: No: ~ (If Yes, continua with this suction) Did incident present a potential throat to Human health or safety? Yes; No: (if Yes, report to FEC as soon as pnssitrl®. tf Na, report to ADEC with 24 hours.) Black smoke emitted from source; (enter tag number antl description) Notified ADEC by Fax on, Date' Time' Report the latlowing Information to ApEC within 24 hours~Y~ (907-269.7908): Date and time of black smoke event: From: To: Volume flared which generated black smoke (if different from above); MSCF 6pLS Doscription of steps to minimize emissions: See Section B, above. Type of materials burned; Gas: NGLs: Other: General Walther: Air Temperature; wind Speed/Direction: Name and phone number of person making [hE report: Name Phone No. Based on information and pc document are t<ue, accurate Facility Sup®rvi3or Rate /y EOC Supervisor, PPtt36 (flare gas and Dlack smoke incidents) Field Environmental Complianea Goartlinators, PRB ~ (Black Smoke incidents only) PBU/GPMA Field Managers, (Blank smok® incidents oniy) GPMA Oporatlans Engineering Technical Aige, (GPMA reports only • ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (Hare gas and black smoke incidents) that the statements anA information in and attached to ~i Nov-16-O1 14:28 From-PRB OPERATIONS 907-659-5061 FACtt-ITY: PH FLARE GAS VEN7[NG REPORT LPO T-159 P.23/27 F-274 PERMIT NO. aAT~-AAg2S PateafDcourrence; 10!11/2001 Fare avant (mrNda/yy) (Check Selection} Total Volume Flared: 271.41 MSCF BBLS MeterNa.: 621 B FaciiitPlanned [Junpiannea (Check Selection) (Lisburne Qrtly -Qas flared was from^ unstrram D downstream (Cnocx One) o17FG contactor meter at LPC) Time of Occurrence: 00:00 Minutes From; 15:23 To: 15:25 00:02 From: 15:45 70: 15:47 = 00:02 From: 16:40 To: 16:41 = g0:g1 From: 18:48 To: 16:50 00:01 From: 17:11 To: 17:12 = Oq:01 From: 17:86 To: 17:48 = 00:07 Total Min utes Flared; - 00:14 (includes volume f/area' whrch geneiatad black smoke, rf applfcabls) A. Qescriptlon of Incident and Cause: (Check es many as needad to fatly describe the Incident) SiD T/Ctf for Process upsetin TiC SD due to high exhaust temperature suction of facility _ _ _ Seal oil bystanl giffiaultics Flaring for drillsite shutdown /startup EMERGENCY SHUTDOWN Flare system testing Eleetrieal /Instrumentation malfunction Faulty snuttlown on Electrical !Instrumentation malfunction Facility maintenance High ambient temperatures. &t other facility (7&D) Qas transit system overpressure X Other: FOR startup attempt. Intermittent bacKing CPF/Flow Station out t[ar)ng for a total of 51 minutes. Excessive ~ insufficient inlet gas ~ Page 2 of a. rates into facility B. Action Taken to Eliminate Cause and Prevent Recurrence: (ChecK and tloscribe as applicable) Started /restarted T/C ar Stabilized taclllry process and operation Compressor / train deprossurgd Repaired equipment difficulties Reduced /increased inlet gas rates with Compietetl flare testinr~ Facility maintenance completed corrected E&I fluctuation / failure X ptnar: Stanu~attompt andea for the day Corrected E&I fluctuation ! failure at other facility (T&D} Dld incident cause black smoke? Yes: No: CI (If Yes, continue with this section) Diq incident present a potential threat to human health or safety? Yes: Na: (If Yes, report to FEC as soon as possible. If No, report W Ap>tC with 24 hours.) BIacK smoke emitted from source: (enter tag number and description) Notified ApEC by Faxon' Date: Time: Report the following Information to AAEC within 2a Hours BY FAX (907.269.7508): Date and time of black smoke event; From: 70: Volume stared which +~eneratad black smoke (if different f rum above); MSCF BBLS Doseription of steps to minimize emissions: See Section B, above. Type of matatials burned: Gas: NGLs: Other: General weaklier: Alr Temperature: wind SpQgd/Dirgcron: Name and phone number of person making trig report: Name Phcne No. Based on information and belief tornlgd aft® Ea onablo inquiry, I certify that the statements and information in and attached to this goeument arc true, accurate t}pc>' 3 le , Facility Supervisor ~ Date ~ L ~ cc: EOC Supgrvis B B (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Tecnnlcal Aide, (GPMA reports only - ATO a77} Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) ~~ Nov-16-O1 14:26 From-PRB OPERATIONS 907-659-5061 T-159 P.24/27 F-274 FLARE CrAS VENTING REPORT SKA. INC. • PRUDHOE BAY/GPI FACILITY: LPG ~ PERMIT NO. ~ 8A7~-Agp2S L/ Date of Occurrence: 70/11/2001 l:J flaro ^vent Tiros of Occurrence:_ {mm/dd/yy) (Gnecx Selection) 00;00 Minutes From: 18:17 To: 18:18 = 00:01 Total Volume Flared: 271.41 MSCF BBLS From: 18:55 70: 18:56 = 00:01 From: 2D;09 To: 20:]0 = 00:01 Meter tJa,:. .621 FaoPlit ~ Plannea ^ unplanned From: 2o~34 To; 20:35 = 0001 (CnecK Selection) From: 20:44 To: 20:45 = 00;01 From: 21:2b To; 21:27 - 00;02 Total Minutes Flared: - 00:07 _ ~ (Lisburne Only -Gas reared was fromq upstream l,]QOwns[ream (Check One) (Includes volume flared whiel, gpnorated black smoke, of TEG contactor meter ai LPC) it apprrcabl9) A. pescription of Incident and Cause: (Check as many as needed to fully describe the lncldent) S/D T/C# for Process upsetin T/G Sp due to high exhaust temperature section o! facility Seal oil system difficulties ~- Flaring for drillsite shutdown r stamp EMERGENCY SHUTDOWN Flare system testing Electrical / Inetrum®ntation malfunction Faulty shutdown on Electrical /Instrumentation malfunction Facility maintenance High ambient tampmraturms. at other facility (T8p) Gas transit system overpressure X Other: FOR startup attempt. Intermittent backing CPFIFIOw Station out flarinQfor a total of 51 minutes, Excessive /insufficient inlet gas PagA 3 of 4. rates into facility B. Action 7aKen to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Stared !restarted 7/C n Stabilized facility process and opsratlon Compressor/train depressurad ~ Rmpalred equipment difficulties Raduemd /increased inlet gas rates with Completed flare testing Facility mainkanance comp)®ted Corrected E&I fluctuation / iailur9 X Other: Startup attempt ended for the day Corrected E&I fluetua~ian /failure at other facility (T&D) Black Smoke Did incident cause black smoke? Yee; Na: ~ (If Yes, continue with this section) pia lncldent present a potenkial thrmat to Human health or safety? Yes: No; (If Y®s, report to FEC as soon as possible. tf No, report to AI]>^C with 24 hours.) 61ack smokA 9mittmd from source: (enter tag number and description) Notified ADEC by Faxon: Date: Time; Report the following information to ADEC within 24 hours BY FAX (907.269.7508): pate and time of black smoke avant: From: To: Volume flared which gmnerated black smoke (ii different from above): MSCF !3131-5 Description of steps to minimi2m omissions: See Section S, above. Type of materials burned: Gas: NGLs: Other: General Weakher; Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: Name Phone No. rsasea on informauon ana oe document era true, accurate Facility Superv[sor ry, I certify that Date /D /2 cf cc, EoC SupErvlsor, P1~6 (flare gas and black smoke Inddents) Field Environmental Compliance Coordinators, PRS 7 (BIacK Smoke incidents only) PBU/GPMA Field ManagArs, (clack smoke incidents only) GPMA Operations Engineering TeGlnical Aidm. {GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smokm incidents) ~~ Nov-16-O1 14:28 From-PRB OPERATIONS 907-659-5061 T-159 P.25/27 F-274 FLARE GAS VENTING REPORT PHILUP5 ALASKA, INC. • PRUDHOE sAY/GPMAIKUPARUK FACILITY: LPt" PERMIT NO. t~A7~=AAt)~'S GAS DISROSITION Date of Occurr9nco: t 0/~ 1!2001 ~ Flare ^ vcnt Tlme of Occurrence: (mm/dd/yy) (Check Selection) 00_00 nilinutes From: 2i~as To; 21:49 - 00:01 Total Volume Flared: 271.41 MSCF BBLS From: 22:20 To: 22:22 00:02 From: 22:80 To: 22:92 = 00:02 Meter o.: 621 , B FttFll{x f 1] Plannca ^ unplanned From: To: ~ 00:00 (Check Selection) From: Tv; = 00:00 From; To: ~ 00:00 Total Minutes Flared - 00:05 (Lisburne Onfy -Gas Nart4d was from^ upstream ^ downstrcnm (Chock One) (includes volume ftarso welch generated black smoke, of T1=Cs contactor meter at LPC) !f applicable) A. Description of Incident and Cause: (Check as many as needetl to fully describe the incident) S/D T/Crr for Process ups6tin T/C Sp due to high exhaust temperature section of facility Seal oil system difficulties Flaring for drlllsite shutdown /startup EMERGENCY SHUTDOWN Flare system tmsting Electrical I Instrumentation malfunction Faulty shutdown on Electrical ! instrumentation malfunction Fatllity maintenance High ambient tArnperaturms, at otheriacility {7&D) Gas transit system overpressure X Qtner: FOR startup attempt. Intermittent backing CPF/Flow Station out ilariny for a total Gf S~ minus®s. Excessive /insufficient inlet gas _ Page 4 of 4. rates into facility F3. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C s Stabilized facility process and operation Compressor / train depressurect Repaired equipment difficulties f~educaq I increased Inlet gas rates ~ with Completed flare testing Facility maintenance completed Corrected E&I fluctuation /failure X Other: Startup attempt ended for the day Corrected f=&I fluctuation /failure at other facility (T&p} Did incident cause Dlack smoke? Ye6: No: ~ (If Yes, Continue with this section) Did incident present a potential throat to Human health or safety? Yes: No: (11 Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smako ambled f rem source; (enter tag numdar and description) Notified ApE=C by Fax on: Date: Time: Repoli the following information to ADEC within 24 hours l3Y FAX (807-268.7508): Date and time of black smoke event: From; To: _ Volume flares which generated black smoke (if different from above): ~ MSCF= Description of stops to minimize emissions: See Section B, abav9. Type of materials burned: Gas: NCnl.s: Other: General Woatnor. Air Temperature: Wind Speed/Direction: Name and phone nurnbar of person making the report: Name ijasap on irnotmauon ana oe document are true, accurate Facility Supervisor statements and information In and Date /D / D 88LS Rhona No. cc: EOC Supervisoh-P'Fi6 6 (flare gas and black smoke incidents) Field Cnvironmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PPU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only • ATO 4~7) Kuparuk: Field l=nvironmcntai Compliance Coordinators, NSK 61 (flare gas ana black smoke incidents) ~/ Nov-16-O1 14:27 From-PRB OPERATIONS 907-659-5061 T-159 P.18/2T F-274 FLARE GAS VRNTING REPORT I'~, j .~ '~' PHILLIPS AI-ASKA, INC. • PRUDHOE F3AY/GPMA/KUPARUK FACII-I?Y: LPG PERMtT NO- 9A78-AA025 GAS DISPOSITION Date of Occurrence: 10/12!2001 ~ Flare ^ vent (mm/ddlyy) (Chock Selection) Total Volume Flared: 1274,3 MSCF BBLS f~letel' f~lra~: 821 8 Facfllt ^ Planned ~ unplanned (Check Selection) (Lisburne Onty -Gas flared was from ^ upsuram ~ downstream (Cr,eck One) ofTt;G conractormorsrat LPCj Time of Qccunr~rtce: 00:00 24:00 Mlnutea From: 07:4 To' o7:a7 = 00;01 From: as:3a To: 09:35 = 00:01 From: o8~ao To: 09:41 = 04:01 From: 09;48 To: 09:50 ~ 00;02 From: 09:51 To: 09:56 = 00:05 From: 08.56 To: 10:04 = 00:06 Total Minutes Flared: - 00:16 (includes volume flared which gertafated olack smoke, if applicable) q. (3eserlption of Incident and Cause: (Check as many as needed to fully describe the incident) ~_ S/D T/C~ fof T/C 8P due to high exhaust temperature Seal oh system difficaltiea 1=MFRGENCY SHU7QOWiV Electrical /Instrumentation malfunction Electrical /Instrumentation malfunction at otherfacifiry {T&D) Gas transit system overpressure X backing CPF/Flow Station out Excessive / insutflclent inlet gas rates into facility S. Acticn Taken to Eliminate Cause and Prevent Recurrence: (Check antl describe as applicable) Stared /restarted T/C # Compressor /train dopressured Reduced /increased inlet gas rates Completed flare testing Corrected E&I fluctuation /failure X Corrected E&I fluctuation / failufe at other faoillty (T&D) Process ups®t in section of facility Flaring for drlllslte shutdown / ataRup Flare system tasting Faulty shutdown on Facility maintenance High ambient tempAraturas. S/D on high vibration Other: FOR startup attempt. Intermittent flaring for a total of 93.minutes. Page 1 of 4. Stabilized facility process and operation Repaired eQuipment diffioulties with Facility maintenance comp!®ted Ocher: Startup attempt done for day. Black Smoke Did incident cause black smoke? Yes: ~ No: ^ (If Yes, Continue with this suction) Did incident present a potential throat to human health or safety? Yes: ^ No: ~ (lt Yes, report to FEC as soon ds poss[ble. If No, report to ADEC With 24 hours.} Black smoke emitted from source: 2t;P02017 De ro Tower flare relief (enter tag number and description) Notified ADEC by Faxon: Data: / 3 D I Time: l I : t Q Ane~. Report the following information to ADt=_C within 24 hours Y FAX (907-268-7508): Date and time of blank smoke event: From: 18:08 To: 18:24 Volume flared which generateq black smoke (if different from above): 327.9 MSCF BBLS Description of steps to minimi2e emissions: See Section 8, above. Type of materials bumad: Gas: x NGLs: Other: General Weather: Air Temperature: 9 deg Wind SpeedlDireotion: 14 /South Name and phone number of person making the report: Jeff Stroud 907-659-8660 NamA Pnono No. Based on information and bell®f formed after reasonable inquiry, k certify that the statements and information In and attached to this document are true, accurate an pie Facility Supervisor Date / cc: EbC Supervisor, R 6 (flare gas and black smoke Incidents} Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers. (Black smoke incidents only} GPMA Operations Engine9ring Taehnicak Aida, (GPMA reports Only - ATO 497) Kuparuk: Field Environmental Gomplianee Coordinators, NSK 81 (flare gas antl plack smoke incidents) P:\Oroups~Environmontal\FOrms1 Uptlated: FEC 6198 Spill-Gds Reporting Form3~t0-4-001 Nov-16-O1 14:27 From-PRB OPERATIONS 907-659-5061 T-159 FI..ARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK P.19/27 F-274 ~~. ~ 1 ~ FACILITY: LPC PERMIT NO. ~A73-AA025 GAS DISPOSITION Date of Occurrence: 10/12/2001 ~ Flare ^ vent (mm/ddlyy) (Check Selection) Total Volume Flared: 1274.3 MSCF BBLS Meter No.; 621 f3 Fa4iilt ~ Planned ~ Unplanned (Check Selection) (usDUme Only -Gas flared was from ~ upstream Q downstream (Cneok one) of TEG conractor meter ai l,PC) T1r-le__ f QacurrenCae 00:00 24:00 tes From: 10:06 To: 10:12 _ 00:04 From: 10:32 To: 1o:3s ~ 00:01 From: 11:22_ To: 11:23 - 4D:01 From: 14:35 To: 14:37 = 00:02 From: 14:49 To: 14:b0 = 00:01 From: 15:22 To: 15:32 ~ D0:10 Total Minutes Flared: - 00:19 (includes volume flared which gener'dfed black Smoke, rf applicable) A. Descriptlon of Incident and Cause: (Ch®ek as many as nestled to fully describe the incident) s/D Tics far T/C SD due to nigh exhaust temperature Seal oil system difficulties EMERGENCY SHUTAOWN Electrical / Instrumentation malfunction Electrical / Instrum®ntation malfunction at other facllfty (T&D) Gas transit system overpressure X backing CPF/Flow Station out Excessive /insufficient inlet gas rakes into facility Proc®ss upset in section of facility Flaring for drlllslte shutdown /startup Flare system tasting Faulty shutdown on Facility maintenance High ambient temperatures. S/D on high vibration Othef: EQR startup attempt. Intermittent flaring for d total Of 93.minutes. T ~ Page 2 of 4. B. Action Taken to Eliminate Cause antl Prevent Recurrence: (Check and tleserlbe as applleaDle) Started /restarted T/C # Stabilized facility process and operation Compressor /train dopr®ssured Repaired equipment difficulties __ Reduced /increased inlet gas rates _ with Completed flare testing Facility maintenance compl®t®d Corrected E&1 fluctuation /failure X Other: Startup attempt done for day. Corrected E&I fluctuation /failure ar other facility (T8D) (Old incident cause black smoke? Yes: Q No: ^ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ~ (If Y®s, report to FEC as soon as posSlbla. if No, report to ADEC with 24 hours.) Black smoke emitted from source: 26f 02017 De ro Tower flare relief (enter tag pumper and description) Notified ADEC by Fax on: Date: Time: tf~ Q_g!-'t Report the following Information to ADEC withl 24 h urs BY FAX (907-269.7508): Dat® and time of black smoke event: From: 18:08 70: 18:24 Volume flar®d which generated black smoke (If different from above}: 327.9 MSCF ~ BBLS Descriptlon of stops to minimise emissions; Sae Sactlon B, above. Type of materials burned: Gas: x NGLs: Other. General Weather: Air Temperature: 9 deg Wlnd Speed/Direction: 14 /South Name and phone number of person mak[ng the report: Jeff Stroud 907-659-8660 Name Phone No. Based on information and bell®f formed after reasonable inquiry, I certify that the statements and information in and attached to this docum©nt era true, accurate a o p Fao(Ilty Supervisor Date /C~ f d ee: EOC Supervi , P B 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Slack smoke incidents only} GPMA Operations Engineering Technical Aide, {GPMA reports only - ATO 477) KuparuK: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) P:\Gtoups~Envl room emal\F'o rms~ updateu: FEC eras Spill-Gas iaeportin~ Forms110.4•flo 1 Nov-16-O1 14:27 From-PRB OPERATIONS 907-659-5061 T-159 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOP BAY/GPMA/KUPARUK P.20/27 F-274 ~t ~~ t FACILITY: LRC PERMIT NO. '~A~-AAp2,5: G4S DISPOSITION Date of Occurrence: 10/12/2001 ~ Flare ^ Vent (mm/ddJyy) (Check Selection) Total Volume Flared: 7278.3 MSCF BBLS 11!(eter No.: 6E1 FJ Facilit ^ Planned ^ unplanned (Check Selection) Time of Occurrence: 00:00 24:00 Minutes From: 15:87 To: 16:41 ~ 40:04 From: fs:aa To: 7s:a~ OO:U3 From: 18:45 To: 16:a6 = ao:o1 From: 17:18 To: 17:19 = 00:01 From: 7~:a5 To: te:2a 00:43 From: f a:a7 To: 7 e:s2 = 00:05 Total Minutes Flared: - 00:57 (Lrsbums Only -Gas Raretl was from ^ upstream (] downstream (Check One) of TEG contacror meter at LPC) (Includes volume i`iared which generated black smoke, if applicable) A• Description of Incident anct Cause: (Check as many as needed to fully describe the incident) SID T/Cf! for T/C SA due to high exhaust iemperaturc Seal oil system dlfflcultles EMERGENCY S!-IUTQOWN Electrical /Instrumentation malfunction Electrical /Instrumentation malfunction at otherfacility (T&D) Gas transit system overpreesure X backing CPF/Flow Station out Excessive /insufficient inlet gas rates Into facility B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applcable) Staged /restarted T/C Compressor /train deprassured Reduced /increased inlet gas rates Completed flare testing Corrected E&I fluctuation /failure X Corrected E8,1 fluctuation / faNure at other facility (T&D} ProC6ss upset in section of facility Flaring for tlrlllslte shutdown /startup Flare system tossing Faulty shutdown on Facility maintenance High ambient temperatur®s. S/D on high vibration Other: FOR startup a_ ttempt_ Intermittent flaringfor a total of 93.minutes. Page 3 of 4. Stabilized facility process and operation Repaired equipment ditficulties with Facility maintenance completed Other: $tartup attempt done for day. Did incident cause black smoke? Yos: ~ No: ^ (It Yes, continue with this suction) Dld IncidEnt present a potential threat to human health or safety? Yes; ^ No: ~ (It Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: 26P02017 De ro Tower flare r®li®f (enter tag number and description) Notified ADEC by Fax 4n: Date: lime: I l t f ~ I~tv~ Report the following [ntormatlon to ADEC Withtn 24 h urs r3Y FAX (fd07-269-9508): Oato and time of black smoke event; From= 18:08 To: 18:24 Volume flared which generated black smoke (if different from above): 327.9 MSCF BBt_S pescriptlon of steps to minimize emissions: See Section s, dbov®. Type of materials burned; Gas: x NGLS: Other General Weather: Air Temperature: 9 deg_ Wind Speed/Direction: 14 /South Name and phone number of person making the report: Jeff. Stroud 907-659-8660 Name Phone No. 8dsed on Information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate an o let FaeEllry Supervisor Date / O cc: EOC Supervisor, S 6 (11are gas and black smoke incidents) Field Envlronmontal Compliance Coordinators, PRB 7 (Black Smoke Incidents only) PBU/GPMA Field Managers. (Black smoke incidents only) CaPMA Operations Englneoring Technical Aide, (CPMA reports only • ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) P:\GrOUp:\F-nvlronmental~Forms~ UpQated~ FFC 8lg8 Spill•Gas RepoRing Forms110.4.001 Nov-16-O1 14:27 From-PRB OPERATIONS 907-659-5061 T-159 P. 21/27 F-274 FARE GAS VENTING REPORT (~~ `t ~}'T PHIIL.I,IPS ALASKA, INC. • PRUDH4E BAY/GPMA/KUPARUK pACILITY: i~PtC PERMIT NO. 9A78-AA025 GAS DISPOSITION Date o} Occurrence: 10/12/2001 ~] Flare ^ Vcnt (mm/dd/yy) (Check Selection) Total Volume Flared: 1274,3 MSCF SSLS Meter 1Vo~t 82't B Facil ^ Planned ^ Onpianned {Check Selection) Time of occurrence: 00:00 24:00 Minutes From: 1g:3B To: 79:37 = 00;01 From: To: ~ From: To: _ From: To: _ From: To: From: To: = Total Mlnutms Flared: - 00:01 (t_sburns only -Gas flared was from ^ upstream ~ downstream (Check One) or TEG contactor meter at LPC) (Includes volume flared which generated black smoke, if applicable) A. Dmscrtptton o1 incident and Cause: (Check as many as needed to fully describe the incld®nt) S!o 7iCrr for T/C SD tlua co high exhaust temperature Seal oil system diffioulties EMERGENCY SHUTDOWN Slectrioal / Instrumentation malfunction Electrical / Instrumontation malfunction at other facility (T&D) Gas transit system overpressure X backing CPF/Flow Ststion out Excessive / inaufficlani inlet gas rates into facility t3, Action Taken to Eliminate Cause and Prevent Recurrence: (ChmeK and describe as applicable) Started /restarted T/C # Compressor/train depr®ssur®d Reduced /increased inlet gas rates Completed flora testing Corrected S&I fluctuation /failure X Corrected E&I fluctuation / failure at other facility (T&D) Process upset in section of facility Flaring for drillsite shutdown !startup Flare system tmsting Faulty shutdown on Facility maintenance reign ambient temperatures. S/D on nigh vibration Other: FOR startu attem t. Intermittent flaring for a total of 93.minutes. Page 4 Of 4. Stabilized facility process and operation Repaired equipment difficulties with Facility maintenance complatod Other: StaRup attem t dono for day. Did incident cause black smoke? Yes: 0 No: ^ (If Yes, continue with this Section) pid incident pr®sent a potential threat to haman hoalth or safety? Yos: ^ Na: ~ (If Yes, report to FFC as soon as possible. If No, repoR to ADEC with 24 hours.) Slack smoko smitted from sourC@: 26P02017 De ro Tower flare relief (enter tag number and description) Notified ApEC by Fax on: Date: Time: (_ S 1 O A~.~ , Report the following information to AEC whh 24 ours BY FAX (sD7.26s-7508): pate and time of black smoke event: From: 18:08 To: 18:24 Volume flared which 9en®rat®d black smoke (if different from above): 327.8 MSCF BB4.S Description of steps to minimize emissions: See Section t3, above. Type of materials burned: Gas: x NG~.s: Other: Caeneral Weather: Air 7emparatura: 9 dog Wind Speed/pirectiorr. 14 /South Noma and phone number of porson making the repoR: Jeff Stroud 907-659•$660 Namo Phone No. Based on information and belief form®d after reasonable inquiry, I Certify that the statements~and information in and attached fo this document ar© true, accurate and C plats. Faculty Supervisor - Date ~ ~ O cc: EOC Supervisor, P S B (flaro gas and black smoke incld®nts} Field Environmental Compliance Coordinators, PFiS 7 {Slack Smoke incidents only) P8U/GPMA Field Managers, (Slack smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA repons only - ATO 477) KuparuK: Field Environments! Compliance Coordinators, N5K 61 (flare gas and black smoke incidents) P:\Groups\EnvironmentallFormS\ Upgared: FEC Bi98 Spl1t-Gas Reporting Forms~io.a.oo t Nov-16-O1 14:27 From-PRB OPERATIONS 907-659-5061 T-159 P.17/27 F-274 FLARE GAS VENTING REPORT _ .. PFIII.LIPS ALASKA, INC. • PRUDHOE BAY/GPIVIA/KUPARUK FACILITY: LAC. PERMIT tVO. $,q~-Ap826 GAS DISPOSITION Date Of Occurrence: 10/13/2001 ~ Flare ^ vent Tlma of Oceurrea er~~. {mm/dd/yy) (Check Selection) 00:00 2a:00 Aitnutes From: 01:09 To: 01:24 ~ OOn S Total Volume Flared: 145.22 MSCF BBLS From: 70: From: To: Meter' No„ 821 >5 F81~11 ^ Planned Q unplanned From: To: _ (Check Selection) From: ~ Y0: From: To: _ Total Mfautes Flared: - 00:15 (Lisburne Only -Gas ftarod was from ~ upstream ^ downstream (Chmok Orte) of TEG contactor meter at LPC) (Includes volume flared whjch generated black smoke, it applicable) a. Description of Incident and Causm: (Check as many as needed to fully describe ehe Incident) X S/D T/C# 1801 for T/C SD due to high exhaust temperaturA Seal oil system difficulties EMERQENCY SHU700WN X Electrical /Instrumentation malfunction Electrical /Instrumentation malfunction at other iaciliry (T&D) Gas transit syst®m overpressure ~~ packing CPF/Flaw Station out Excessive /insufficient inlet gas rates into facfliry e. Action Taken to tEllminate Cause and Prevent Recurrence: (Check and deacrlbe as applicable) Process upset in section of facility Flaring for drillsitg snuttlown /startup Flare system testing Faulty shutdown on Facility maintenance High ambient t®mperatures. S/D on high vibration vumr. X Stetted /restarted T/C # 1 B01 Stabilized facility process and operation Compressor / train dopressured Repaired equipment difficulties Reducod /increased inlet gas rates with Completed flare testing Facility maintenance complotod Corrected E&l fluotuatlon /failure Other; Corrected E81 fluctuation /failure at other facility (7&D} Black Smoke Dld incident cause black smoke? Yes: ^ No: ~ (If Yes, continue with this section} Did incldcnt present a potential thress to human health or safety? Yes: ^ No: ^ (lf Xes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: _ (enter tag number and description) Notified ADBC by Fax on: Date: Time: lioport the following information to ADEC within 24 hours t3Y FAx (907-269-7508): Date and time of black Smoke ®vont: From: To: Volume ilareq Which generated black smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of maletlals burned: Gas: NC~LS: Other. Goneral Weather: air T®mperature: Wind Spced/Direction: Name and phone number of person making the report: Name Phone No. Based on information and belief formed after reasonable inquiry, 1 certify that the statements and mformation In one atracnea to rnib document ar® true, accurate ~pd`,bryplej~Y/ _ , Facility Supervisor ~ L pate-/Q/~c3 / ~ / cc: EOG Superviso , 6 (flare gas and black smoko incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Manag®w, (Black smok® incidents only) GPMA Operations Engineering Technical Aide, (GPMA roports only - ATO 477) Kupdruk: Field Environmental Compliance Coordinators, NSK 81 (flaro gas and black smoke incidents) P:~Groups~EnvrronmentaflFormsl Updated: FEG 6/98 Spill-Gas peporting Forms\lo•4-0o t Nov-16-O1 14:26 From-PRB OPERATIONS 907-659-5061 T-159 P.13/27 F-274 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMIT NO. 9A73-AA025 ~~ GAS DISPOSITION Date of Occurrenoe: 10/13/2001 ~ Flare ^Vont (mmldd/yy) (Check Selection) Total Volume Flared: 1476.8 MSCF BBLS Mater No.: 621 B Faaitit ~ Planned ^ Unplanned (Check Selection} (Lisburne Only -Gas flared wds from ^ upstream [~] dowrutream (Check One) of TEG eonractor meter at LPC) Tune of Occurrence: OQ:00 ?.4:00 Minutes From: Q9:43 To: os:54 = 00:11 From: 10:05 To: 10:08 - 00:04 From: 1 a:1 z To: 10:19 = 00:0) From: 11:07 To: 11:12 = 00:05 From: 11:16 70: 11:18 = 00:02 Frain: 12:08 To: 12:09 = 00:07 Total Minutes Flared: 0 00:30 (Includes volum® flared which generated black smoke, if applicable) A. Dascriptlon of Incident and Cause: (Check as many as needed to fully describe the incltlent) S/D T/C# for T/C SD du® to high exhaust temperature ~- Seal oil system difficuhies EtwERt3ENCY SHUTDOW N t5lectncal /Instrumentation maltunciian Electrical ! Instrumentation malfunction at other facility (78,0) Cias transit system overpressure X backing CPF/Flow Station out Excessive /insufficient Inlet gas _ rates Into facility t3. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Compressor !train depressured Reduced /increased Inlet gas rates Completed flare testing Corrected E&I fluctuation /failure X Corrected E&I fluctuation /failure at other facility (T&D) Process upset in section of facility Flaring for drillsite shutdown /startup Flare system feeling Faulty shutdown on Facility maintenance High ambient temperatures. 5/D on high vibration Other; COA startup attempt ntermittent flare events #otaling 147 m_inutef Page 1 of 3. Stabilized facility process and operation Repaired equipment difficulties with Facility maintenflnce Completed Other: Startup attempt done for day= Did incident cause black smoke2 Yes: ^ No: ^ (If Yas, continue with this section) pjd incident present a potential throat to human health or Safety? Yes: ^ No: Q (If Yes, report to FEC as soon as possible. II Na, report to AD@C with 24 hours.) Black smoke emitted from source. 26P02017 De ro tower vent, (enter tag number and description) Notified ADEC by Fax on: pate: Q , p 1 Time: G : S'7. q.,,.~ _ ___ R9poA the following Information to ADEC witttln 24 Hours 6V FAX (807-269-750ti): Date and time of black smoke event: From: See addendum To; Volume flared which generated black smoke (if different from above}: 297.07 MSCF BBLS pescription of steps to minimize emissions: See Section 8, above, Type of materials burned: Gas: x NGLs: Other. General Weather: Air Temperature; 7 deg _ _ Wind SpeedlDireotion: 9 / SW Name and phone number of person making the report: Jeff Stroud 907.859-8660 Name Phpne No. eased On Information and 4Alie1' document era true, accurate and Facility Supervisor Date d / ~ / to cc: 1<OC Supervisor; f+a8 6 {flare gas and black smoke incidents) Fiala Environmental Compliance Coordinators. PRB 7 (Black Smoke incidents an[y) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO a77) Kuparuk: Field Environmental Compliance Coprdlnators, NSK 61 (flare gas and black smoke incidents) 1 certify that the statements and P:1Groups\Environmental~Forma\ Upaaieo: FEG 8198 Spill-(3as Reposing Form5110.4.00 3 Nov-16-O1 14:26 From-PRB OPERATIONS 907-659-5061 T-159 P. 14/27 F-274 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: I,PC PERMIT ND. 9A73-AA425 GAS piSPOSITION Date of Occurrence: 1 0/1 312 0 0 1 ~ Hare ^ vent Ti a of Occurrence, (mm/dd/yy) (Check Selectioh) 00:00 2h:00 Minut s From: 13:14 To; 13:27 = 00:08 Iota) Volume Flared: 1d76.8 MSCF EELS From: 13:34 To: 13:51 - 00:17 From: 1a:o2 To: 1x:10 = DD:08 Meter No.: 62l $ F6CIIIt Q Planned [~ unplanned From: 14'43 To: 14:49 = 00:06 (Check Selection) Fram: 14:55 To: 15:09 ~ Op:1a From: 15:21 T0= 15:41 = OD:20 Total Minutes Flared: Ot:13 (l_isburno Only -Gas flared was from ^ upstream (] Qownstream (Check Orre) (1nclutYBS volume flared which generated black smoke, of Ti^G contactor meror at LPC) if iZpplicable) A. Doscrlptlon of Incident and Cause: (Check as many as needed to fully describ® the incident) S/D T/Ctt for T/c SD due to high exhaust temperasure Seal oil system Qit(iculties EMERGEtdCY StiUTQOWN ~_ Elearlcai I Insuumentation malfunction Eiactrical /Instrumentation malfunction at other facility {T&D} ~- Gas transit system overpressure X packing CPF/Flow Station out Excessive / Insufficient {nlet gas rates Into facility S_ Action Taken to Eliminate Cause and Prevent Recurrence: (Check antl tlescrlbe as apptlcaple) Started /restarted TIC # Compressor /train depressured Reduced /increased inlet gas ratos Completed flare testing Corrected f"8[ fluctuation /failure k Corrected E&I fluctuation / !allure at other facility (T&A} Process upset in Section 61 tat:lllty Flaring for dritlslte Shutdown f startup Flare system tasting Faulty shutdown on Facility maintenance ~ligh ambient temperawras. __ S/f) ort high vibration Othef: FOR staRup attempt ntermittent flare events totaling 147 minute; !~ Page 2 of 3. - - Stabilized fecitity process and operation Repaired equipment difficulties with Facility maintenance Completed Other: Startup attempt Bone for day_ Aid incident Cause black Smoke? Yes: ~ No: ^ (If Yes, contlrt^ue with this Section) Did incident present a potential threat to human health or safety? Yes: No: d (If Y®s, report to FEC as soon as possinle. If No, report to ADEC with 24 hours.) Black smoke emitted from source: 26P02017 De ro tower vent. (enter tag number and description) Notified ADBC by Fax on: Date: l d ~ D l Time: : S2 Report the following lnformatlon to ADEC within 24 Hours 0V FAX (907.269-7508): Date and time of black smoke event: From: See addendum To: Volume flared which generated black smoke (if dlfforent from above): 297.07 MSCF 88LS pescription of steps to minimize emissions: See Section B, above. Type of materials bulged: Gas; X NCaLS: Other: General Weather: Air Temperature: 7 deg - Wind Speed/Directivn: 9 / S_W Name and phone number of person making the reportl; Jeff Stroud 807-659.6660 Noma Phone No. Based on information and belief formed after reasonable inquiry, {Certify that the statements and information in and attached to this document are true, accurate an lets Facility Supervisor Date v ~ y O cc: EOC Supervi RB 6 (flare gas and biaek smoke incidents) Field Environmental Gompiiance GoarClnators, PRB 7 (Blank Smoke incitlsnts only) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only • ATO 477) Kuparuk: Field Environmental Gompiiance Coordinators, NSK 61 (flare gas and black smoke Incidents) P:~G roues\En~i ton mema{~form%~ upaecea; FEC 898 Spltl-Gas Reporting Eorms110.4-00 3 Nov-16-O1 14:26 From-PRB OPERATIONS 907-659-5061 T-159 P.15/27 F-274 FLARE GAS VENTING REPORT PHILLIPS ALASKA, ING. • PRUPHOE BAY/GPMA/KUPARUK LPC FACILITY PSAMIT NO. 9A73•AA025 : GAS DISPOSITION bate of Occurrence: 10/13/2001 ~ Fiore ^vent lime o~urrence: (mm/dd/yy) (Check Selection) OO;Q4 24:00 Minute From: 9B:a~ To: 76:Sa 00:07 Total Volume Flar¢d: 1479.8 MSCF BBLS From: 18:35 Yo: 18:43 = 00;08 From: 18:50 To: 19:08 = 00:19 Motel' No.: 621 ~ Facilit ~ Pianneo ^ Unplannea From: 19:09 To; 19:95 = 00:06 (Cheek Selection) From: 21:17 To: 27:20 = 00:03 From: 29:20 To: 21:23 = 00:03 Total Minutes Flared: ~ 00;43 (Lisburne Only • Gas flared was from Q ~Pstream [I downstream (Check One) of TEG contactor marer ai LPC) (Includes volumo flared which generated black smaKS, it applicable) A. Description Of (ncid®nt and CausB: (Check as many as needed to fully tlescrlbe ine Incident) S/D T/C# for T!C SD due to high exhaust temperature Seal oil system diiticultles EMERGENCY SHUTDOWN ~_ Electrical !instrumentation malfunction Electrical /Instrumentation malfunction at other taClsity (TB.D) ~- Gas transit system overpressure X backlog CPFrFIaw Staticn out Excessive /insufficient inlet gas rates into facility B. Action Taken to Eliminate Cause antl Prevent Recurrence: (Check antl tlescrlbe as applicable) Started / restaged TIC # Compressor / train depressured Reduced / inCroased inlet gas rate6 Completed flare testing Corrected E&! fluctuation /failure X Corrected E&I iluctustion /failure at other facility (T&D) Process upaetin section of fadllty Flaring for drillsite shutdown !startup Flora system testing Faulty shutdown on FaciAty maint®nance High ambient temperatures. S/D on high vibration Other: FOR startup attempt ntermittent flare events totaling 147 minutes ~~ page 3 of 3. Stabilized facility process and operation Repaired equipment difficulties wish Facility maintenance completed Other: Startup attempt done for day. Black Smoke Did incident cause blank smoke? Yes; CI No: ^ (If Yas, continue with this section) . Did incident present d potential threat to human Health or safety? Yes: ^ No: ~ (lf Yes, report to FEC as soon as possible- If No, report to ADEC with 24 hours.) Slack smoke emitted from source: 26P02017 De ro tower vent. (enter tag number and description) Notified ADEC by Fax on: pate: t7 Ot Time: L: S 2.tJ~ Report the following Information to ADEC within 24 hours BY aX (907-269.7$08): Date and time of black smoke event; From: See addendum To: _ Volume flared which generated black smoke (if different from above): 291.07 MSCE BBLS Description of steps t0 minimize emissions: See Section B, above- Type of materials burned: Gas: x NGLS: Other: General Weather: Air Temperature: 7 deg Wlind Speed/Direction: 9 / SW Name and phone number of parson making the report: Jeff Stroud 907-659.6660 Name f'honE No. Based on information ana belief formed after reasonable inquiry, I Certify that the Statements and information in and Sttached to this document are true, accurate and c let . Facility Supervisor Date ~ ~ cc: FOC Supervisor, S 6 (flare gas and blacK smoke incidents} Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) P8U/GPtvIA Field Managers, (Black smoke incidents only} GPMA Operation6 >•ngineering Technical Aide, (GPMA rcporks only • ATO 477) Kuparuk: Feld Environmental Compliance Coordinators, NSK 61 (flare gds and black Smoke inoiderlts) P:1Qro~ ps\Envi rorunental~Form a\ Spill-Gas Reporting Forms\10-A-00 3 1 rnnafAA~ FEC: 8198 Nov-16-O1 14:26 From-PRB OPERATIONS 907-659-5061 T-159 P.16/27 F-274 \`. / U Addendum :Black Smoke Time lntervalsNolumes Start time 9:43 10:06 10:16 11:09 13:19 a-~d 1 J,"'J 14:08 14:46 15:06 15:28 15:35 _ 15:39 18:35 18:52 19:00 ~O.19 Stop time 9:45 10:09 10:19 11:11 13:21 13:37 13:51 14:10 14:48 i 5:09 15:29 15:36 15:40 1$:37 18:55 ~ o•n~ Volume mscf 3.73 - 34.72 42.07 29.85 0.84 7.23 34.58 20.21 28.21 38.83 0.7 0.5 12.7 2.7 8.8 10.4 21 1 J. I V Total Volume Black Smoke Flared: 297.07 ~v~iy~o~ Nov-16-O1 14:26 From-PRB OPERATIONS 907-659-5061 T-159 P.12/27 F-274 FLARE GAS VENTING REPORT PH1Ll.IPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK r. FACILITY: LPC PERMR NO. eA73-AA025 GAS DISPoSIT10N Date of Occurrence: 10/14/2001 0 Flare ^ vent (mrrvdd/yy) (Check Selection) Total Volume Flared: 124.42 MSCF ~_BBLS Meter No.: 621 B Faclllt []Planned ~ unplanneQ (Check Selection) (Lisburne Only • Gas tlar9d was tram d upstream ^ Downstream /Cnack Onel of TEG contactor meter s! LPC) Process upset in section of taciliry Flaring for drillslte shutdown /startup Flare system testing Faulty snutdawn on Facility maintenance Hign ambient tempAratures. 5/D on high vibration Other: A. Desertptlon of Inclden: and Cause: (Check as many as naoded to fully describe the incident) X s/p 7/Cs 1801 for T/C SD tlue to high exhaust temperature Seal oil sys~em ditiicultiea EMERGENCY SHUTDOWN ~- X Electrical /Instrumentation malfunction Electrical / InstrumentatOn malfunction at Oth6r 18Clllty (T&D) Gas transit system overpressure backing CPF/Flow Station out ~xCASSIve / inSufflClent inlet gas rates inta taciliry t3. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as appllcapl®) X Staged /restarted 7IC # 1801 Compressor /train depresaured Reduced /increased inlet gas rates Completed dare testing Corrected E&I fluctuation /failure Corrected E8.1 fluctuation /failure at other faoitlty R&Q) Stabilized facility process and operation Repaired equipment difficulties with Facility maintenance completed Other: pia ineidQnt cause black smoke? Yes: ^ Na: ~ (lf Yes, continue with this section) bid Incident present a potAntlal threat to human health or salary? Y9s: ^ No: (l1 Yes, report to FFC as soon as passible. tf No, report to ADSC with 24 hours.) Black smoke emitted from source: (enter tag number and d®scription) Notified ADEC by Faz on: Date: ~ Time: Report the following (niormatlon to AOFC within 24 hours BY FaX (907.269-7W8}: Date and time of black smoke event: From: To: Volume flared which generated black Smoke (if tllfferent from above): MSCF Description of stops to minimize emissions: See Section B, above. Typo of materials burned: Gas: NGLs: _ Other: General Weather: Air Temperature: Wind Speed/Airection: Name and phone number of person making the report: Jeff Stroud Name Based on information and be document are true, accurate Facility Supervisor that the statements and Time of Occurrence: 00:00 2rs:00 Inures From: 03:05 To: Os:16 = 00:13 From: ~~ To: _ From: To: _ From: To: From: To: _ From: To: _ Total Mtnutes Flaretl: = 00:13 (includes volume flared which generated black smaKe, if applicable) Date / ~ BSLS 907-659.8880 Phone No. ~d to this cc: EOC Superv~, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance GoOrdinatOfS, PRR 7 (BIaCK Smoke Incidents only) PBU/GPMA Field Managers, (Black smoke incident6 on{y) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) )Cuparuk: Field Lnvironmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) P:\Groupe\E nvlronmenlalVt=arms\ Spill-Gas Reporting Forms\104-00 3 Nov-16-O1 14:25 From-PRB OPERATIONS 907-659-5061 T-159 P.11/Z7 F-274 FLAFit (aA, VtN I INC; HkF'UFiI PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: l-pG PERMIT N0. 8A73-AA925 pat® of Qeeurr®nc®: 1p/14/2001 ^ Flare ^Vent (mm/dd/yy) (Check Selection) Total Volume Flared: 3aa,02 MSCF t38LS Meter Na-: 621 B P~cilit Q PlanneQ [] Unplanned (Check Selection) Tim e of_Qc currence: 00:00 24:00 Minutes From: oa:os To: 08:09 00;01 From: 10:52 To: 11:02 - 00:10 From; 11:Dti To: 19:11 = 00:05 From: 77.22 To: 17:32 = 00:10 From: 17:3b To: 17:38 = 00:03 From: 20:57 To: x1:03 - 00:06 Total Minutes Flared: - 00:35 (Lisburne Onry -Gas flared was from ^ upstream ~ downstream (Check Ona) of 1'E'G conracrormorsrat LPG) (Includes volume flared which genorar®d black smoke, if applicable) A_ Description of incident and cauae~ (Check as many as needed to fully describe the Incident) SID T/Crr for T/C SD due to high exhaust temperature Seal oil system difficulties _ _ ~,_ EMERGENCY SHUTDOWN Electrical !Instrumentation malfunction ~~ ElectrlCal !Instrumentation malfunction at other facility (T&D) Gas transit system overpressure X backing CPF/Flow Station out Excessve ! msutllclent inlet gas rates into facility e. action Taken to Eliminate Cause and Prevent Flecurrence: {ChecK and aescrtbe as applicable) Started /restarted T/C # Compressor / train dopressurecE Reduced /increased inlet gas rates Corripletod flare testing Corrected !"&I fluctuation /failure X Corrected E&I fluctuation /failure at other facility (T8p) Process upset in S9Cti0n of faciljty Flaring for aritlsite shutdown !startup Flare system testing Faulty shutdown on Facility maintenance High ambient temperatures. S/D on high vibration Other: _EOR startup. Intermittent flaring for a total of 35 min. Stabilized facility process and operation Repaired equipment glfficulties with Facility maintenanc® completed Other: Startup complete. Black Smoke Did incident cause black smoke? Yes: ^ No: ~ (If Yes, continue with this section) Did incident present a potential throat to human health or safety? Y®s: ^ No: ^ (If Yes, report to FEC as soon as passible. If Na, report to ADEC with 24 hours.) Black smoke emitted from so4rce: (enter tag number and description) Notified ADEC by Faxon: Date; Time: Report the fallowing Information to ApEC within 24 hours BY FAX (807-269-7S0a): Date and limo of puck smoke event: From: To: Volume (lar6d which generated black smoke (if different from above): MSCF f3BLS Description of steps to minimize emissions: See Section B, above. Type of materials burned; Gas: NGLS: Other: General Weather: Air Temperature: Wind Speed/Direction: Name and phone number of person making the report; Jeff Stroud Name 907-&59-8060 Poona No. i3ased on information and belief formed after reasonable inquiry, I certify that the statements and information in anq attacneq to this document are true, accurate an te. Facility Supervisor Gate O ec: EOC Supervisor, PRB 6 (flare gas and black smoke incidents] Field Environmental Compliance Coordinators, PRS 7 (Black Smoke Incidents only) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmentdl Compliance Coordinators, NSK 81 (flare gas and black smoke incidents) P:\Groups~EnvironmAntdllFarms~ Upaated; FEC 8198 Spin-t3ae Reporting Forms~t 0-4-00 3 Nov-16-O1 14:25 From-PRB OPERATIONS 90T-659-5061 T-159 P.10/27 F-274 ' FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDWOE BAY/GPMA/KUPARUK FAGILITY: LPG PERMIT NO. 9A73-,AAQ25 __ GAS pISPOSITION ^ Flare ~ vent Tlme of Qocurrenee: pate of Occurrence: 10/15/2001 _ (mm/dd/yy) (Check Selection) 00:00 24:00 Minutes From: 15:57 To: 16:01 = 00;44 Tote! Volume Flared= 59.5 MSCF BBLS Fram: To: _ From: To; _ Meter nlo.: 6F1 t3 Facillt LO PienneA (^ unplanned From; To: (Cheolc Selection) From: To: _ From; To: Total Minutes Flared: - DO:Oa (Lisburne Only • Gas (eared was from ^ upstream Q gownstream (Check one) (Irtc(udes volume flared which g®n©rated black smoKe, of TEG contactor meter ar LPC) /f applrcable) A. Description of tncldant and Cause: (ChecK as many as needed to fully describe the incident) S1D T/Cx for Prccess upsAtin T/C Sp due to high exhaust temperature section of facility Seal oil system difficulties Flaring for drilleita shutdown r startup EMERGENCY SHUTpOwN Flare system testing Electrical / tnstrumentatlon malfunction Faulty shutdown on Electrical /Instrumentation malfunction FacI11ry maintenance High ambient temperatures. ai other facility (T&D) S/D on high vibration Gas transit system overpressure X Other: FOR startup attempt. backing CPF/Flow Station out Excessive / insufficient inlet gas rates Into facitiry B. action Taken to Elfminate cause antl Prevent Recurrence: (Check and describe as applicable) ~ . ____~_._ Staged /restarted T/C # Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced /increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected F&t fluctuation /failure X Other: Startup attempt done far day. Corrected E&I fluctuation /failure at other facility (T&D) Black Smoke Did incident cause black smoke? Yes: ^ No: 1] (If Yes, continua with this suction) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (If YAS, report to FEC as soon as passible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report the following Information to ADEC within 24 hours BY FAX (8D7.269.75D8): Date and time of black smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF BSLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: GaS: NGLS: Other: General Weather: Air Temperature: Wind Speed/Dir6ction: Name and phone number of person making the report: JEff Stroud 907-659-8660 Name Phone No. Based on information and belief f ed aft savable inquiry, I certify that the statements and information in and attaches to this document are true, accurate a o pl Facility Supervisor Pate /G cC: EOC Supervt or, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRI3 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aidc, (GPMA reports only - ATO 477} Kuparuk: FIe1d Environmental Compliance Coordinators, N5K 61 (flare gas and black smoke incidents) p~1G roupa~EnvironmenlallFOrM S~ Updated: FEC 6/96 Spllhtaag Reporting Forms~l0.4.00 3 Nov-16-O1 14:25 From-PRB OPERATIONS 907-659-5061 T-159 P.09/27 F-274 LPC Black Smoke Report Addendum ~~ Start time Stop time Duration {minutes) Volume (MSCF) 14:31 '14:32 0:01 5.26 1 x':29 17:32 0:03 60.29 17:63 17:54 0:01 8.63 18:04 18:05 0:01 31.9 Total Time (minut®s): ~ 0:06 ~ __ Total Volume Black Smoke Flared: 106.08 Nov-16-O1 14:24 From-PRB OPERATIONS PHILLIPS 907-659-5061 T-159 P.06/27 F-274 FLARE GAS VENTING (3~PORT ~SKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: >.,PO PERMIT NO. 9A73-AA021a Date of Occurrence: 10/16/2001 ~ Flare ^ vent (mm/dd/yy) (ChecK Selection) Total Volume Flared: 901.72 MSCF BBLS afar lyo.: B2t B Facilit GI planned ^ unplanned (Check Selection) (Lisburne Onty -Gas flared was /rom ^ upstream O Downstream (Chock One! of TECa contactor moron at LPC) Time of Occurrence• 00:00 24:00 Mlnut~ From: 14:29 To: 1x:33 = Oo:oa From: 1a:36 To; 7a:37 ~ oo~ot From: 17.70 To: 17:14 = OD:04 From: 17:22 To: 17:36 = OO:t4 From: 1%38 To: 1746 = 00:08 From: 17:47 To: 17:52 = 00:05 Totat Minutes Flared: = 00:36 Q ao:s~ (Includes volume flared which generated blaCK Smoke, if applicable) A. Etescrlptlon of Incident and Cause: (Check as many as needed to fully describe ttte Incident) SID 7/Cu far _ T/C Sp due to nlgn exhaust temperature Seal oIl system difficulties EMERGENCY SHIITpOWN Electrical /instrumentation malfunction Electrical /Instrumentation malfunction at other faci{ity (T&D} Gas transit system overpressure X backing CPF/Flow Station out t=xceasive ! insulfiGent Inlet gas rat9a Into facility e. Action Taken tp Eliminate Cause and Prevent iiaourrence: (ChecK and describe as applicable) Startod /restarted T/C # Compressor /train depr®ssured R®ducod /increased inlet gas rates Completed flare testing Corrected E&I fluctuation /failure X Corrected E&I fluctuation /failure at otl1er facility (T&D) Process upset in section of facility Flaring for drillslte shutdown /startup Flare system testing Faulty shutQOwn on Facility maintenance rf ign arnbiant temperatures. S/p on high vibration Other: FOR startup attempt. Intermittent flaring for total of 59 minutes. Page 1 of 3. Stabilized facility process and operation Repaired equipment difficulties With Facility maintenance Complet9q Other: Startup attempt done for day_ Did incident cause black smoke? Yes: ~ N0: ^ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ~ (If Yes, report to FEC ds soon as passible. If No, repoR to ADEC with 24 hours.) Black smoke ®mitted from source: 26P02017 DeprOp Towor flare vent (enter tag number and description) Notified ADEC by Fax an: Date: Time: Report the lollowtng Intormatlan to ADEC witnln 24 hours BY FAX (907.269-7608): Rate and time of bIaCK smoke avant: From: See addendum To: Volume flared which generated bIdCK smoke (if different from above): 10f>.Q8 MSCF )3l3~S Description of Steps to minimize emissions: See Sr?ctlon B, above. Type of materials burned: Gas: X NGLs: _ Other: General Woather: Alr Temperature: 12 Wind Spe6d/Airection: 14 / NE Name and phono number of person ma~ng tho r~ on:' Jeff Stroud 907-659-8660 Name Phone No. Based on information and belief document are true, accurate and Facility Supervisor Date ~~-~ ~'' ©~ cc: EOC Supervisor, RB 6 (flare gds and black smoke incidents) Field Environme al Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBIJ/GPMA Fie onagers, (Black smoke incidents only) GPMA Operdti ns ngineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Fiel n ronmentai Compliance Coordinators, Nsl< s1 (flare gas and black smoke incidents) inquiry, 1 certify that the statQmants and information in and attached to P:\GrvupS\Environrnenral\Forms\ upgatea: FEC 8/9B Spill-Gas Reponin8 Farms\1a-4-oo s Nov-16-O1 14:Z5 From-PRB OPERATIONS 907-659-5061 T-159 ' ~ FLARE GAS VENTING REPGR7 PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK P.07/27 F-274 FACIt-ITY: LPC PERM17 NO. 8,P17'3-AA025 GAS DISPOSITION J/ Date of Occurrence: 10/1fl/2001 ~ Flare ^vent Time ca. Qccurrance: {mm/dd/yy) (Check Selection) oo~o0 24=Q4 Minutes From: 77:63 To: 17:67 00:04 Total Volume Flared: 80t.7z MscF 68LS From; 18:01 To: 1s:1s Oo:12 From: 19:25 To: 19:26 = 00:01 Me#eP No~: 621 B Faiclll [~ Planned ^ unplanneA From: 19:49 To: 19;50 00:01 (Check Selection) From: 20:02 To: 20:03 = 00:01 From: 20:14 To: 20:15 = 00:01 Total Mlnutes Flared: - 00:20 (L/sburne Only -Gas flared was from ^ upstream ~ downstream (Check ones (Includes volume flared which generated black smoke, of TEG contactor marBr at LPCj !f applicable) A. ~escrlptian of Incident and Cause: (Check as many as n9etlcd to fully describe the incident) 5/p T/C# for 7!C SD due to high 6xnaust temperature Saal oil system dlfficultiea ~,,_ EMERGENCY SMUTGOWN Electrical / Instrumentation malfunction _ Electrical /Instrumentation malfunction at other facility (78,D) Caa transit system overpressure X _ bacKing CPF/Flflw Station out Excessive / Insufllcient inlet gas rates into facility B. Action Taken to Eliminate Cause antl Prevene Recurrence: {Check antl d®scribe as applicable) Started / restaRod T/C # _ Compressor / train depressured Reduced /increased inlet gdS rates Completed flare tossing Corrected E&I fluctuation /failure X Corrected E&I fluctuation /failure at other facility (T&Dj Process upset in sACtion at facility Flaring far dri(Isita shutdown /startup Flare system testing Faulty shutdown on Facility maintenance High ambient temperatures. _ S/p on high vibration Other: FOR startup attempt- Intermltterit flaring for total of 59 minutes- Pa9a2of3 Stablli2ed facility process and operation Repaired equipment difficulties with Facility maintenance completed Other: Startup attempt done for dam Did incident caus® black smoke? Yes: 0 No: ^ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: (If Yes, report to FEC as Soon as possible. If No, report to ADEC with 24 pouts.} Black smoke emitted from source: 26P02017 Deprop Tower flar® vent (enter tag number and description) Notified ADEC by Fax on: pate: Time:, Aepart the following information to ADEC within 24 flours BY FAX (907-269-7508): pate and time of black smoke evens: From: Sae addendum_ 70: Volume flared which generated black smoky (if different from above): 106.08 MSCF Description of steps to minimise emissions: Sea Section B, above. Type of materials burned: Gds: X NCaLS: Other: General Weather: Air Temperature: 12 Wind Speed/plrection: 14 / N!- Name and phone number of person making the report; Jeff Stroud Name HdSed on Information and belief formed aftt document are true, accurate and complete. Facillry Supervisor Data 8l3LS 907-fi59-8660 Phone No. cc, EOC Supervisor, PRB 6 (flare gas and black smok¢ incidents} Field Environmental Compliance Coordinators, PR<3 7 (Slack Smoke incidents only) PBU/GPMA Field Managers, (Black smoke incidents only} GPMA OpAratians Engineering Technical Aide. (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK tit (flare gas and black smoke Incidents) inquiry, I certify that the statements and information in and PaGroupslEnvl ronmen~ai~orms~ updated: FEC 8138 SpilhGa6 Reporting Forms\10-4-00 3 Nov-16-O1 14:25 From-PRB OPERATIONS PHILLIPS 907-659-5061 T-159 FLARE GAS VENTING REPORT .SKA, 1NC. • PRU©HOI= BAY/GPMA/KUPAFiUK P. 08/27 F-274 FACILITY: LP.C PERMIT NO. eA7~-AA02;a Date of OccUrrenc0: 10!18/2001 ~ Flare ^ vent (mm/dd/yy) (Check Sel©ction) Total Volume Flared: 901.72 MSCF BBLS Meter No : 62'1 B FaGllit^ Planned ^ Unplanned (Check Selection) Tim e of Qc currence: 00:00 24:00 l+~tnutes From: 20:38 To: 20:39 - 00;01 From: 2o:g3 To: 2o:ga oo:ot From: 21:07 To: 21:08 = OO;Ot Prom: To: Front: 70: _ From: To: _ _~_ Total Minutes Ftared: - 00:03 (Lisburne Only -Gas flared was from ^ upstream ~ aownstream (creek Ona) o/ 7EG contactor meter at LPC) (includes volume flared which generated black smoke, !f applG:able) A. Descrlptfon o} tncltlent antl Cause: (Check as many ae needed to fully describe the incident) S/D 7/CS for T/C SD due to nigh exhaust temperature Seal oil system difficulties _ EMERGENCY SHIJTpOWN Electrical /Instrumentation malfunction ~_ Electrical / Instrumentation malfunction at oth6r facility (T&D) C3as transit ayetem overpressure X cacking CPFiFIOw Station out Excessive / insufficienk inlet gas rat®s into faculty Aetlon Taken to Eliminate Cause antl Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C u Compressor /train depressured Reduced / increasetl inlet gas rates ~.___..,__._ Completed flare testing Corrected E&1 fluctuation /failure x_ _ _ __ Corrected E&i fluctuation /failure at other facility (T&D) Ditl incident cause black smoke? Yes: ~ No: ^ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: Q (If Y®S, r®port to FEC as soon as possible. If No, report to ADEC with 24 flours.) Black smoke emitted from 6ourCe: 26P02gt 7 Daprop Tawor flare vent (enter tag number and tleacription) Notified ADEC by Fax on: Date: Time: Report tits fonowing Information to ADEC wltRln 24 trouts BY FAX (947-2fi9-75b8): Date and time of black Smoke event: From: See addendum To: Volume flared which generated black smoke {if different from above): 106.08 MSCF BBLS Description of steps to minimise emissions; See Sectlan S, above. Type of mat®rials burned: Gas: X NGLS: Ocher: General Weather; Alr Temporatur®: 12 Wind Speed/DireCtion: 14 ! NF Name and phone number of person making the repoR: Jeff Stroud 907-ti59-13660 Name Phone No. Based on intormatlon and belief formed after reasonable inquiry, I certify that the stater document are true, accurate and complete. Facility Supervisor Dato Process ups6t in section of facility Flaring for drillsite shutdown !startup Flare system testing Faulty shutdown on Facility maintenance High ambient temperatures. S/D on high vibration Ocher: FOR startup attempt, In[srmittent flaring for total of 59 minus®s. Page 3 of 3 Stabilizetl facility process and operation Repaired equipment difficulties with Faculty malnt®nance comp!®ted Otnor: Startup attempt done for day, iri ar<d attached to this Cc: COC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PR8 7 (Black Smoke incidents Only) PBU/GPMA Field Marlagars, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke lnc(dents) P:ltaroups\EnvironmentallForms~ Upaatod; FEC 8/48 Spill-Gas Reporting Forms\10.4.00 3 Nov-16-O1 14:24 From-PRB OPERATIONS 907-659-5061 T-159 P.04 F-274 FLARE GA5 VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHO~ BAY/GPMA/KUPARUK FACILITY: LPG PERM17 NO. 9A73~AAA,26 date of Occurrence: 10/17/2001 ~ Flare ^ vent (mm/dd/yy) (Check Selootlon} Total Volume Flared: 4t5 MSCF BBLS Meter No.: B Fat;l I ^ Pldnneo Q unplannao (Check Selection) (Lisburne Only • Gas flared was firm ^ ups'<redm ^ cownstream (CnockOnal of TFG contactor mater at LPCJ Time of Q ccurrence~ 00:00 24:00 inutes From: 12:36 To: 12:39 = 00;03 From: 12:sa To: 13:30 ~ oo:3a From: 1A:31 To. 14:39 = 00;08_ From: 19:49 Tv: 20:00 = _ 00'11 From: 20:04 To: 20:04 = OO:OS From: Tv: _ Total Mlnutos Flarotl: - ~ - 01:03 (Includes v~lumo flared which generated black smoke, If applicable) a. Description of Incident and Cause: (Check as many as needed to fully gescrlbe the incident) S/D T/C# for T/C SG due to high exhaust temperature Seal oil system difficultiAS EMERGENCY SHUTDOWN ~_ EI®ctrical !Instrumentation malfunction Electrical! Instrumentation malfunction at other facility {T8D) _ Gas transit system overpressure X packjng CPF/Fbw Station out Excessive / insufliCiOnt inlet gas rates into facility B. action Taken to Eliminate Cause and Prevent Recurrence: (Ctteck and describe as applicable) Started /restarted T/C # Compressor /train depressured Reduced ! increased inlet gas rates Completed flare testing Corrected E&I fluctuation /failure X Corrected E&I fluctuation /failure at other facility (TB,D) Process upsetln BeCtlon of facility Flaring for drillsit0 shutdown /startup Fiaro system testing Faulty shutdown on Factllry maintenance HI~h amplest temperatures. S/D on high vibration OtYtar: FOR startup and attempts. Stabilized facility process and operation Repaired equipment difficulties with Facility maintenance compl®t®d Other: Startup attempts done for day. _ _ piq Incident causm black smoke? Yes; ^ No: ^ (If Yes, continue witft this Section) Dla Incident present a potential threat to human health or safety? Yes: Q No: ~ (lf Yes, report t0 FEC as soon as possible. If No, report to ApCC with 24 hours.) Black smoke emlttmd from source: 2fP02017 De ro Twr flare vent (enter tact number and pascription) Notified ADEC by Fax on: Pate: -O Time: ~2 rSo _ Report the following Information to ADEC within 24 no rs BY FAX (907-2139.7506): Date and limo of black smoke event: From: Sae addendum To: Volume flared which generated black smoke (if different from above): 1$8.61 MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLS: Other: General Weatnmr: Air Temperature 71 de F Wind Speed/Direction: North Name and phone number of person making~ihe rep Ran_dv Cates II'' Name 907-659-8660 PhOrte N0. Based on information and belief formed aft r mas ab inq try, 1 certify that the statements and Information in and attached to this document are true, accurate and complet Facility Supervisor Gate ~~l~~j- ~' cc: EOC Supervisor, PR B (flare gas and black smoke incidents) Field Environmental ompli8nce Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field an gars, (BIeCK smoke incidents only) GPMA Operations Eng Baring Technical Aide, {GPMA reports only - ATO 477) Kuparuk: Field En ~ ental Compliance Coordinators, NSK 61 (flare gas and black smoke incige~ts) P:\Gra,ps~Envl ronmentallForms\ Updated: FFC flr98 Spbl-Gas RoDartinp FormzU017ot scare report BS Nov-16-O1 14:24 From-PRB OPERATIONS 907-659-5061 T-159 P.05 F-274 CPC .Black Smoke Report Addendum ~~~ Duration Volume Start time Stop time (minutes) (MSCF) 14:32 14:39 0:07 139.6 19:49 19:55 0:06 49.21 Iota! Time {minutes}: 0:13 Total Volume Black Smolce Flared: 188.81 ,~ Nov-16-O1 14:24 From-PRB OPERATIONS 907-659-5061 T-159 P.03 F-274 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUQIIOE BAY/GPMA/KUPARUK FACtUTY: LPC PERMIT NO. 9A73~AA02,5~ GAS DISPOSITION \.,~ Date of Occurrence: 10!18/2001 Q Flare ^vent Time of Occurr®nce: (mmlddlyy) (Check Selection) 00:00 24:00 Mlnuteg From: 02:15 To: 02:17 00:02 Total Volume Flared: a MSCF ssLS From: To: From: To: _ Meter No.: E! Fdoilit ^ Planned ~] unplannec F(om: To: _ (Check Selection) From: To: ~ _ From; To: _ Total Mlnutos Fiarod: - 00:02 (Lisburne Only -Gas flarotl was from ^ upstream ^ aownstream (CAeak Onej (Includes volume flared WhJch gr~narated black smoke, of TEG contactor meter at LPC) if applicabte) a. psecrlption of Incident and CAUSe: (ChecK as litany as needed to fully describe the incident} S/p 7/Ci~ for Process upset in Tic sp due to high exhaust temperature section of facility Seal oil system tlltfleuities Raring for arlllshe shutdown /startup EMERGENCY SHUTpoWN Flare system testing Elecvical /Instrumentation malfunction Fauuy shutdown on Etoctrical /Instrumentation malfunction Facility maintenance rfigh ambient temperawres. at other facility (T&D) S/D on high vibration C3as transit system overpressure X Other: 1855 Offgas comp. shutdown backing CPF/Flow Station out No apparent cause, Excessive /insufficient inlet gas rates into facility B. Action Taken to Eliminate CaUSe end Ffevent Recurrence' (Check end describe as applicable) Startma / restarted T/C a- Stabilized facility process and operation Compressor /train depressured Repaired equipment difficulties Reduced / increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected E&I fluctuation / failure X Other: Restarted 1855 Offgas comp. Corrected E81 fluctuation !failure at other facility (T&D) Stack Smoke Did inCiderat cause black smoke? Yes: ^ No: ~ pf Yes, continue with this S6Ction} Did incigerit present a potantiai threat to human health or safety? Yes: ^ No: ^ {lf Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smok0 emitted from source: (enter kdg number and description) Notified ADEC by Fax on: pate: Time: Report the following information to ADEC within 24 hours BY FAX (9Q7.269.7508): Date and time of black smoke avant: From: To: Volume flared which generated black smoke (if different from above): MSCF st3LS pascrlptlon of steps to minimize emissions: Sea Section ~, above. Type of materials burned: Gas; NGLe: Other: General Weather; Air Temperature: wind Speed/Direction, Noma and phone number of person making he repo Name Phone No. Based on Information and belief formed aft r aso b i qulry, I certify that the statements and information in and attached to this document are true, accurate and complete. Fac[Ilty Supervisor pate ~~ -,I g'~ cc: EOC Supervisor, PR 6 (flare gas ana black smoke incidents) Field Environmental mpliance Coordinators, PRB 7 (BIacK Smoke Incidents only) PBU/LAMA Field n ors, (BIacK smoke incidents only) GPMA Operations E ~ eering Technical Aide, (raPMA reports only • ATO 479) Kuparuk: Field >wnviron ante! Compliance Coordinators, NSK 61 (flare gas and black smoke Incidents) P:\t3roups\Bnvironmonwl\~rme\ Updates: FEC 8198 SRUI-Gas Reporting Forms1101801 Hale feport Nov-16-O1 14:24 From-PRB OPERATIONS 907-659-5061 T-159 P.02 F-274 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDWOE BAY/GPMA/KUPARUK l=AGILITY: LPG" PPRMl7 NO. 9A73•AA026 ' Date of Occurrence: 10/19/2001 ^ Plan ^ vent (mmrdd/yy) (Check Selection) Total Volume Flared: 2s3 MSCF BaLS Meter No.: ~ Fact(iit ^ Planned Q tlnplanrp:d (Cneok Selection) {Lisburne Only -Gds flareq was from ^ upssrream ^~ downstream (Cheek One} of TEQ contactor melAr at LPCJ Time of Occurrefl0~~ 00;00 24:0 Mlnu From: 16:18 70: 15'25 = 00:07 From: 15:36 To: 15:35 B 00:01 From: 15.48 To: 15:49 = 00:01 From: 16:13 To: 16:25 = 04:12 From: 16:28 To: 19:32 = 00:04 From: 19:x7 To: 16-39 = 00:02 Total Minutes Flared: - 00:29 - ~~~ (Includes volume /laced w(ticn generated black smoke, if applicable) A. Descriptfan oT Incident and Cause: (Check as many as needed to fully describe the incident) S/D T/CSi for 7/C SD due to high exhaust temperature Soai ell system diflicultiea EMERGENCY SHUTDOWN Electrical /Instrumentation malfunction Electrical r Instrumentation malfunction ai other facillty (T&D) Gas transit system overpressure X backing CPF/Flow Station out Excessiv®I insufficient Inlet gas rates Info facillty 8. Action Taken to E)Iminate Cause and Pravont Recurrence: (Gtteek and describe as applicable) Started /restarted 7/C is Compressor /train d©prossured Reduced !increased inlet gas rate6 Complet®d flare testing Corrected E&I fluctuation /failure X Gorrected S&I fluctuation !failure at other facility (T&D) Black Sme cue process upset in ___ section of tacitity Flaring for drillsito shutdown /startup Flare system testing Faulty ehuttlown on Facility maimenanco High ambient temperatures. S/D on nigh vibration Other: EQR startup 1830 Stabilized facility process and operation Repaired equipment difficulties with Facility malntonance completed Other: 1830 compressor On line Did incident cause tijlacK smoke? Yes: ^ No. ~ (lf Yes, continue with this section) pfd incident present a potential threat to Human health or safety? Yas: ^ No; (If Yes, report to FEC as Soon ds possible. if No, report to ADIwC with 24 hours.) Black smoke emitted from saurce~ (enter tag number and asscrlption) Notified ADBC by Fax on: Date: Time: Report the following inTOrmatlon to ADEC within 24 hours l3Y Fox (9Q7-269-~5tI6): Date and time of black smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF Description of slaps to minimize emissions: Sae Section B, above. Type of materials burned: Gas: NGl-s: Other: General Weather; Alr Tomperatuff~~ Wind SpeedlDirection: Name and phone number of person maki~g the re~o~t: II Name [3asod on information and ballet farmed document are true, accurate and corral Facility Supervisor Date r~~ ~ ~~ cc: EOC Supervisor, !3 6 (flare gas and black smoke incidetts) Field Fnvirortmen Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field M Wagers, (l3lack smoke Incldonts only) GPMA Operation ineering Technical Aide, {GPMA reports only - ATO 477) Kuparuk: Field Envi nmental Compliance Coordinators, NSK 81 (flare gas and black smoke incidents) Phone No. certify that the statements and information in and attached to BBLS P~~Groups\EnwrorxtwntdnFOrmg~ updated: FEC 8/46 Spill-Gas Reportinr~ Farms\10161]1 flare report Oct-25-O1 06:27 From-PRB OPERATIONS 907-659-5061 T-119 P.02/04 F-182 ~SKA, INC. • PRUDHO~ BAY/GPMA/KUPARUK FACIt_ITY; LPC' PERMIT N0. ~ 9A7,3-AA028 GAS DISPOSITION Date of Occurrence: 10/21 /2t)Ol ~ Ftare ^ Vent (mm/dd/yy) (Check Selection) Total Volume Flared: 407 MSCF ggLg eter No.: ~ Fdt:ill ^ Planned ~ unplanned (Check Selection) (Llsbume c)nry -Gas 1laratl was from Q upstream ^ downstream (Cnacx one) of TEG contactor meter at LPC) lime of p cCUrrence; 00:00 24:00 tYlln~tes From: 05:48 70: O6~09 = 0021 From: oases To: 09:70 = OO:p1 From: 09:10 To; 09.23 _ = 0013 From: _11_:38 To: 11:34 = 00;01 From: t2:$1 To: 12:33 = 00;02 From: 12~4a To: 12;45 = 00.01 /~ Total Minutes Flared = _ 00:39 (~/ (/rte-udes volume flarBd which generated black sr'~ke,~~ if applicable) A. oaecriptton of Incident and Cause: (Check as many as needed to fully describe the Incident) X S/D T/C# 1801 for _~ T/C SO due to high exhaust temperature Seat ell system difficulties _ EMERGENCY SHUTDOWN X ~IeCtrical / tnstrumentati0n malfunction ~^~ Elecirloa! / Instrumentarlon malfunction at other facility (7ao) Gas transit system overpressure -" _^ AacKing CPF/Flow Srarfon ou- Excessive /insufficient inlet gas ralos into facllfty B. Action Taken to Eliminate Cause and Prevent gecurronco: (Check and describe ae applicable) X Startaq /restarted T/C # t 8t]0 X 5tabilizetl facility process and operation Compressor /train tlopresbured Repaired equipment difficulties Reduced /increased inlet gas rates with COmpfeted flare tasting Facility maintenanc® completed Corrected E&I fluctuation /failure Other: Corrected F81 fluctuation / failure at Other facility (T&D) PAGE 1 OF 2 Black 3m°ke Did incident cause black smoke? Yes: ^ No: 0 (!f Yes, continue with this section) Aid incident present a potential threat to human health or safety? Yes: ^ No: ~ (If Yea, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted front source: (enter tag number antl description) Notified ADEC by Fax on: pate: lime: Report the }ollawing Information to ADEC wlttrln 2a hours BY Fox (g07-269-X508): date antl time of b(acK Srnoke event: From: To: Volume Eldred which generated black smoke (if different from above): MSCF BBLS Descriptlon o} Steps to minimize emissions: Sea Section B, above. Type of materials burned: Gas: NGt_s: Other. General Weather: Air Tempe lure: 6 wind Speed/Dlrection: 17-2o/E to W Name dnd phone number of parson making th sport: _ Shepard _ g6~p Name ~ -' Pftone No. basso on Intormdtion and belief formed afterrFe~Ona a nq iry, I certify document are true, accurate and complete. ,/ Facility Supervisor Date l d ~2~-,~~ ^~ Cc: EOC Supervisor, ARS (flare gas and black smoke incidents) Fietq Environmental o pliance Coordinators, PRS 7 (i3lack Smoke inciGt3nts Ony) PaUlGPMA Flald na era, (BIacK smoke incidents only) GPMA pperaticns gl acting Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Enviro sofa? Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) Process upset in section of facility Flaring for tlrillsil® shutdown ! stanup Fcaro system resting Faulty shutdown on Facility maintenance Nigh ambient temperatures. S/D on high vibration Other: P:1Groups\EnvironmencanFenns\ Updated: FEC al98 Spill-Gas Flepcrting Forms~1az00t oars report Oct-25-O1 06:27 From-PRB OPERATIONS 907-659-5061 T-119 P.03/04 F-182 . ~.,..- ...-... • ter. r n~~a na:rvn r PHlLI~lPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC. PERMIT NO. SAT~S.AAD2S GAS D!$!'pSITION Date of Occurrence: 10/21/2ot]1 _ Oplare ^Vcnt (mm/ddryy) (Check Selection) Total Volume Flareq: MSCF f313LS Mir Ntt.: I~ Foal ^ Planneq ~ Unplanneq (Chock Selection) (Lisburne Only • GAS flared w&S floor ~ upstream ^ Opwnstrcam (Check onel of TEG contactor meter ar LPC) Time of Occurrance~ 00:00 2rt:00 nutes From; t~:aa To: 1a:aa = 00:01 From: f4.at; To: 14.09 = 00.01 From: 15:f0 To. 15:11 . 60'01 From: 16:03 To: 1604 = 0001 From: 17;00 70: 17:04 = 00:04 Front; To: t Total Minutes Flared: _ 00:08 S (fnC/udes volume l/dred which generated black sntaka, if appficdble) A. Desorlptlan of fncldent antl Cause: (CIteCK as many as needed to fully describe the incident) X S/D 7/C# 1801 for T/C SD due to high exhaust lemperatur9 Seal oil system tlitficulties _ EMERGPNCY SFiUTDQWN X Electrical /Instrumentation malfunction Electrical r Instrumentation malfunction at other facility {T8p) Gas transit system overpressur0 _-,~ backing CPF/Flow Station out ExC9ssive / insufficient IRIOt gas rates into faClllly Process upset in section of facllliy Flaring for drillsita shutdown /startup Flare system testing Faulty shutdown on Facilty maintenance High ambient temperatures. S/D on high vibration Other: B. Action Taken to Eliminate Cause end Prevent Recurrence: (GheCK and describe as applicable) X Started /restarted T/C # t 801 r X ,~ Stabilized facility process and operation Compressor /train deprassured Repaired equipment difficulties Reduced /increased inlet gas rates with Completed flare testing Facility maintenance completed Corrected E&I fluctuation /failure Other: Garrected E&I fluctuation / failur® at other facility Cr&~) PAGE 2 Blank Smoke Did incigant cause black smoke? Yes: ^ No: ~ (li Yes, continue with this section) 17id incident present a potential threat to human health or safety? Yes: ^ Na: Q (If Yes, report to FEC as soon as posstble. If No, report to ADEC with 24 hours.) t3lack smoke emitted from source: (enter tag number and description) Notified ADEC by Fdx on: Date: Time: Aeport the following Information to ADEC within 24 hours ~Y FAX, (907-269-7508): Date and time of black smoke event: From: 70: Volume flared which gen®rated btdck smoke {If different from above): MSCF BBLS pascription of steps to minimize emissions: See Section B, above. Type of materials purred: Gas: NGLs: Other: General Weather: Alr Yemperaturo: 26 Wind Speod/Diraction: 17.20/f~ to W Name and phone number of person making the report: Shepard Name ~ -"' ttasod on Information and ballet formed aftE document are tnao, accurate and complete. Facility Supervisor the statements and Date 8660 Phone No. to cc: BOG Supervisor, PRB ti (flare gas and black smoke incidents) FEBId Environmental Compliance Coordinators, PRB 7 (81ack Smoke inoidente only) P8U/GPMA Field Managers, (Black smoke Incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk; Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) Updated: FFC 8198 P:\Graup:\Envlronmerna~\Forms\ Spill-has Reporting Forms\1 D2001 tirBt Aare report Oct-25-O1 06:27 From-PRB OPERATIONS 907-659-5061 T-119 P.04/04 F-162 r-ta.r.t_ .s..o vcty ~ nvu rtGrutt f PHILLIPS Ql-ASKA, INC. + PRUQHOE BAY/GPNJA/KUPARUK FACtt_ITY: LPG PERMIT NO. 8,A73•,AA025 GAS DISPOSI7lON Date o} Occurrence: t 0/29/2001 ~ Flare ^ vent Time raf Qccurrenee• (mm/gd/yy) (Check Selection) 00:00 24:00 Minutes From: Total Volume Ftareq: 168 MSCF 13SLS From; 02:63 To: 03:1 B ^ 03:52 To: 03:54 ~ 00:25 00:02 From; l+~l~er NQ*% S Facif it ^ Planne4 Q Unplanned Frpnt; 04:OS To: t1C:18 ~ To: 00:13 (Check Selection) From: 70: From: ~ To: Total Minutes Flared: - OO:RO (LlsGurne Only • Gas f/ar@q was from ^ upstream ~ downseream (Chock onal (1RCludes volume I/ar8d which generafed plack smOk® of TEG ccnractor meter at LPC} 1f appkcable) , A. Description of Inddent and Cause: (Check as many as needeA t0 /ully tloscribe the Ineid@nt) X S/D T/Cri 1890 for T/C SO duo to high exhaust tamp®rature Seal cjl sy.t@m diltiCUlties EMERGENCYSHUTGOWN ~' Electrical /Instrumentation malfunction Electrical / lnstrumamatien malfunction at other facility (T&D) Gas transit system overpressure ~` _ _ _ backing CPFlFIOw Station out ExceeaN@ / lnsulfiaiBnt inlet gas rates into faclllly B. Action Taken to Eliminate Cause and Prev@nt Recurrence: (Check and describe as applicable) X Started / restarted T/C # t83p X Compressor /train dapressured Reduced /increased inlet gas rates Compl®tod Hare testing ~"" Corrected E&I fluctuation /failure Correetoq F&I fluctuation /failure at other facility (7&D) Process upset in FOR SOCtian of 1aciGty Flaring for drillsite shutdown I stanup Flare ayst@m testing Faulty shutdown on Facility maintenance High ambi@nt tomp9raturea. S/D on high vibration Other: Stabilized facility process artd operation Repaired equipment difficulties with Facility maintenance completed Other: Did incident cause black smoke? Yes: ^ No: 0 {If Yes, continue with this section} Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (!f Yes, report to FEC as soon as possible. ff No, report to ApEC with 24 hours.) 61ack smoke emitted from source; (enter tag number and description) Notified ApEC by Fax on: pate: Time: Report the following Information to ADEC within 24 (tours BY FAX (907.259.75118): Date and time o(pldck smoke event: From: _ _ To: volume tiered which generated black smoke (if different from above): MSCF f38LS Description of steps to minimize emissions; See Section B, above. ~_ Type of materials burned: Gds: x NfaLs: Other: General Weather: Air Temperdtur ~ 5 Wind Spsed/D1reCtion: 0.5/IN Name and phone number of person making t~e rcaq~r : SheparQ „ _ 8680 (' l ~ ~ Name Phone No. tsasea on information and belief 1 document are true, accurate and Facility Supervisor in Date ~ ~ - L -' V cc: EOC Supervisor, P (flare gas and blacK smoke incidents) Field Environments Co pliance Coordinators, PR0 7 (131ack Smoke Inciaenta only) PBU/GPMA Field M a ere, (Black smoke incidents only) GPMA Operations f=ngtneering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) P~\G rou ps\t:rrvlronmental\FO anal Upgalod; FEC 8198 Spill-GQe Reporting Forms1102301 flare report Act-29-O1 07;37 From-PRB OPERATIONS 907-659-5061 T-125 P.07/11 F-201 / FLARE GAS VENTING REPORT l PHILLIPS ALASKA, 1NC. • PREJDH4E BAY/GPMA/KUPARUK FAGILITY: l.PC PERMIT TIO- 9A7S-AAt)25 GAS DISPOSITION 10/25/2001 0 Plarc ^ vent Oats of occurrence: Tlm of ~ccurrenc _ (mm/dd/yy) (CnecK Selection} 00:00 24;Q4 Minutn4 From: os:4s To: oa:aa y 00:01 Totat Volume Flared: 32.57 MSCF BBLS From: 04:18 To: 04:18 = 00:01 From: Oa:27 T0: 04:28 = 00:01 Meter r~fo.: t3 FacUit ^ Planned ~ unplanned From: 04:47 To; 04:48 = 00,01 (Check Selection) From: 04:57 To: 04.58 = 00:01 From: Os:o1 To: os:o2 = 00:01 Total Minutes Flared: ~ 00:06 (Lisburne Onfy -Gas Nared was from ^ upstream ~] Downstream fcnecx One/ (includes volume flared which generated b/8Ck smoke, of TEG oonfacrar motor at r:P+:) if a pplicable) A. Description of Incident antl Cause: (Chuck as many as needed to fully describe the incident) X SID T/C~ 1830 for 7/C SD dug to nigh exhaust lomperature Seal oil system CifiioulGes EMERGENCY SMUTt)OWN Electrical ! Instrumemation malfunction Electrical / Instrumontatlon malfunction at other taclllty {T8D) ~_ Gas transit system ovorpreseure backing CPF/Row Station out Excessive / insufliGlent Inlet gaS rates Into facility B. Action Taken to Eliminate Cause and Prevent Recurrence: (ChocK and describe as appllcablo) X Started / restarted T!C r# 1830 X ~~ Compressor /train depressurod Reduced /Increased inlet gas rates Completed flare kesting Corrected E&I fluctuation /failure ~~ Corrected E&! fluctuation /failure of other facility (T&D) Process upset In FOR section of facility Flaring for driilsite shutdown / startup Flare system tasting Faulty shutdown en Facillry maintenance Hlgn ambient temperatures. S/D on nigh vibration other; Stabiiizetl facility process and operation Repaired equipment ditflCUlties with Facility maintenance completed Other: Did incldont cause Black smoke? Yes: ^ No; ~ (lf Yes, continua with this section) Did Incident present a potential throat to human heart or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as passible. If No, report to ADEG with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Delta: _ 71me: Report the following Informat{on to ADEC within 24 Hours BY FAX (907-2fi8-7508): pate and time of black smoke avant: From: d To: Volume flared which generated black smoke (if different from above): MSCF t3t3LS Description of steps t0 minlmize emissions: See Section B, above. Type of materials burned: Gas: X NGLs: Otnor. General Weather: Air Temperature: Wind Speed/Direction: Name and pnane number of person making the repork: E. Webb Name 8660 phone No. Faseq on information and bel~ f Formed of raasonabl i t certify that the statements and information in and attached to document arc true, acc d c_omplet . Facility Supervisor ~ Date [f~'.G.l~ rd f cc: EZSC SupA'rvisor, PR~s {tlaro gas and bladlfsmoka incidents) Field Environmental Compliance Coordinators, PRi3 ~ (Black Smoke incidents only) PSUlGPMA Fieltl Managers, (Slack smoke incidents only) GPMA Opsratlons Enginaer{ng Technical Aide, (GPMA reports Only • ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gaS and black 6moke Incidents) P:~C3roups~nvironmentanForm6~ Updated: FEC 8198 5p111-Gna Reporting Forme~t 08501 tlofo roportMt Oct-29-01 07:37 From-PRB OPERATIONS 907-659-5061 1=LARE GAS VENTING REPORT PHILLIPS AlJ\SKA, INC. • PRUDWOE BAY/GPMA/KUPARUK T-125 P.OB/11 F-201 FACILITY: LPC ' PERMIT NO. ~ 9A'78-AA025 GAS DISPOSITION Date of 4ecurrence: 10/25/2+101 Q Flaro ^Vent Ti of Occurrence: _ (mm/aa/yy) (Check selection) OO;QQ 24:00 Minutes From; 05e13 To: 05:14 = 00:01 Total Volume Flared: 41.33 MSCF >3SLS From: 05-23 To; 05:24 = 00:01 From: 05-3& To; 05:30 = 00:01 Meter No.: 13 Facili ^ Planned ^ unplanned From: 05:56 To; 05:57 = 00;01 (Check Selection) From: 09:07 To: 09:08 _ 00;01 From: 09:17 To: 09:18 = OO:Ot Total Minutes Flared: = 00:08 __ (LfsburRe Only -Gas Il~red w&S from 0 upsveam ~ downstream rCnecx One) (tncluda5 valums flared which gerierared black smoke, or 7EG cantacrorrnarsrat LPC) if applicable) A. Description of Incltlent and Cause: (ChacK as many as need~tl to fully describe the Incltlent) X SR] T/G# 1830 for TIC SD due to nigh exhaust temperature _ Soal oil system difficulties EMERGENCY SHUTDOWN Electrical / Ins[rumontation malfunction _ Electrical / Ins[rumontation malfunction at other facltity (T&R1 Gas transit system averprossure bacKing GPF/Flow Station out ~^ Excessive / insuftloient inlet gas rates into facltity ~. Action Taken to Ellminate Cause antl Prevent pecurrenCO: (Check and describe as applicable) X Started /restarted T/C ~ 1830 X Compressor /train depressurad Reduced /increased inlet gas races ~,,,, ~- Completed flare testing Corrected E&I fluctuation /failure Corrected ~&1 fluctuation / failure at other faclllry R&D) ProC93S upset in EQR Section of facility Flaring for drillsite Shutdown /startup Flare system testing Faulty shuttlown on Facility malnenance Nigh ambient tempAraturos. S/D on high vibration Other: Stabilized facility process and operation Repaired equipment difficulties with Facility maintenance completed Other: Did inciaent cause black smoke? Yes: ^ No: ~ (If Yos, continue with this section) pia Incident present a potential threat to Human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible. tf No, report to ADEC with 2a hours.) Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Fiaport the following Information to ADEC within 24 hours BY FMS (907.261}-7508): Date and time of black smoke event: From; To: Volume flared which genert;ted plack smoke (it different from above): ~MSCF 6SLS pescrlption of steps to minimize emissions: See Section S, above. Type of materials purred: Gas: X NGLa: Other: General Weatnor: Air Temperaturo: Wind Speed/Direction: Name and phone number of person making the report: E. Webb 866 Name Phone No. tdasea on mtormauon aria suet t document are true, ac arui Facility and attached to Date +/~ ~ f~f~ ~ Q~ EO~Suporvislt/, WRS B (flare gas a?fd black smoke incidents) Field Environmental Compliance Coordinators, PRS 7 (Black Smoke incitlants only} PBU/GPMA Field Managerb, (BIacK smoke incidents only) taPMA Operations Engineering Technical Aitle, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 81 (flare gas and black smoke incitlonts) that the statements and p:~Groupa~Environmvntaluorma~ updatetl, F>=G area Spn1-Gas Reporting Forma~to2501 (fare reporte2 pct-29-O1 07:37 From-PRB OPERATIONS 907-659-5061 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDIiOE BAY/GPMA/ICUPARUK FACILITY: LPC Date of Occurrence: t 0/25/2001 (] Flare ^ vent (mm/dd/yy) (Check Selection) Total Volum® Flared: 72.17 MsCF BBLS Mater No.: i3 Faalllt ^ Planned ^~ unplanned (Check Selection) (Lfsbume Only • Gas flared was bom ^ up~ream ^ downsvedm (Chopk orte) of 7EG contactor meter of LPC) Process upset in FOR section of facility Flaring for drillske shutdown /startup Flare system testing Faulty Shutdown on Facility maintenance High ambient temperatures. S/D on high vibration ptner: A. Description of Incident antl Cause: (Chock as many as needed to fully daacrlbe the incident} X $/D T/C# 1$30 for T!C SD due to high exhaust temperewra ~- Soal oU system diffitulges EMERGENCY SHUTDOW N Electrical / lnstrumentadon malfunction Eieetrlcal /Instrumentation malfunction at other facility (T8D) Gas transit system overpressure backing CPF/Flow Station out Excessive l inSUfflGient inlet gaS rases into tacinty B. Action TaKen to Ellmittate Cause and Prevent Recurrence: (ChecK and descriBe aS applicable) X Started /restarted Y/C ~ 1830 X Compressor /train depressured Reduced /increased inlet gas rates _„_ Completed flare testing Corrected E&I fluctuation !failure Corrected E81 fluctuation / failure at other facility (T&D) Stabilized facility process and operation Repaired equipment diftiCUltlos with Faclllry maintenance completed ocnt3r: T-125 P.09/11 F-201 Dltl incident Cause black smoKe? Yes: ^ No: ~ (If Yes, continue with this section) Qld incident present a potential throat to human health or safety? Yes: ^ No: ~ (If Yes, report to FEC as soon as possible. H No, report to ADEC with 24 hours.} Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax on; Data: Time: Report she following Information to ADEC within 24 hours BY FAX (907.289-X508): Date and tim© of black smoke event: From: To: volume flared which generated black smoke (it different from above): MSCF BBLS Description of steps to minimi2o emissions: See Section B, above. Type of materials burnep~ Gas: X NGI-s: Other. General Weather: AfrTemperature: ~ Wind Spaed/Direction: Name and phone number of person making the roporc: E. Webb 8660 Name Phone No. Based or: Information and belief formed after reasonable inqu document arA true, accurate and complete. Facility Supervisor PERMIT NO. ~ 9A7~3-AA025 Time of Occu rrence: X0:00 24__:__00 tnutea From: 09:21 To: 09:22 = oo:b1 From: 09:46 To: 09:46_ _ ~:Ot From: 10:01 To: 10:10 00:08 From: 10:29 T0: 10:32 = 00:03 From: 10:40 To: 10:41 = 00;01 From' 12:34 To: 12:35 d 00:01 Total Minutes Flarotl: ~ 00:18 (Includes volume flared which geRarated black smoke, If applicable) Date in and attached to cc: EOC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only} PBU/GPMA Fiala Managers, (slacK smoke incidents only) GPMA Qperatlons Engineering Technical Aitla, (GPMA reports only - ATO 477} Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) P:1GroupalEnvvonmcnw:\Forma\ Upas[ea: FEC 9/99 Spill•G8s Reponlnq ForM9\102507 tlaro ropor:u3 Oct-29-O1 OT:38 From-PRB OPERATIONS 90T-659-5061 T-125 P.10/11 F-201 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: IwPC PERMIT NO. 9A'79-AA025 CAS DISPOSiT10N Date of Occurrence: 10/25/2001 ~ Flare ^ vent 71m of Occurrence: nutA~ o MI o ao:oo 2g (mm/tld/yy) (Check Selection) , _ „ From: 13:16 To: 13:17 = 00:01 Total Volume Flared: 586.18 MSCF BBLS From: From: 16:31 To: 13:32 00:01 13:47 To: 13:56 00:09 BtOf NA: H Feel i ^ Plsnnea Q Unplanned From: 14:00 To: 14:36 _ = 00,36 (ChACk Selection} From: 14:41 To: _1a:42 = 00:01 . From: 0: 16:00 c 00.01 14:59 1 Total Minutes Flared: - 00:49 {6fsaurne Only • Gas tlarod was from ^ upstream ^ downstream (Check Orel (includes volume flared which g©nerated black smoke, of TEG contactormarerat LPC) rf aPPf'~bls1 A. Doscrlption of Incident anQ Cause: (Check as many ea neotled to fully describe the Incident) EoR X S/D T/Crf 1 aso for Process upset in TIC SO due to h;gn exhaust tomperatura section of facility Seal o;l system t11ff:s+ufti03 Flaring for drillsite sttutdown !startup ~- EMERGENCY SHUTDOWN Flare system testing Electrical ! lnstruntontation malluncC~on Faulty shutQOwn on l=laetrical /Instrumentation malfunction Facility maintenance High amAlent tAmperatures. SID on high vibration at 0th®r facility tT8D} Other: Gas transit system overpressure backing CPF/Flow Station out ~~ Excessive !insufficient inlet pas rates into facility 6. Action Taken to Ellminete Cause and Prevent Recurrence: (Check and doscrlbe as applicable) X Stabilizatl facslity process and operation X Started / reatartod T/C tr 1830 Repaired equipment diffiCultios Compressor /train depressured Reduced / (ncreast3tl inlet gas rates with Facility maintenance completed Completed flare testing ~ Corrected E&I fluctuation / failure Other: il f f ~- a ure luctuation / Corroded E&I at other facility (T&D) Black Smoke Dld incident cause blacK smoke? Yes: ^ No; 0 (If Yes, continue with this section} ^ No: ^ Did inciaont present a potential threat t0 Human health or safety? Yes: (If Yes, report to FEC as soon ds possible. If No, report to ApEC with 24 hours.) (enter tag number antl tlsscription) Black Smoke emitted lrom source: Notified ADEC by Fax on: Date: Time: Report the following information to ADEC within 24 hours sy Fnx (907.269-7508): Date and time of black smoke event: From: To: MSCF BBLS Volume flared which generated black smoke (if different from above): Description of steps to rninimi2e emissions: See Section e, above. Type o1 materials purned: Gas: X NGLs: Other. Wind Speed/Direction: General WeattlBP. Alf Temperature: Webb E 8660 . NamO and phon© number of person making th9 report: Phone No. Name Based on Information an lint form of er reaso le Inquiry, I cortiiy that the statements and information in and attached to this document arc true, a and co le . r rO l Facility Supervise Data`( cc: E u ervisor 6 (tiara gas and k srriUt~a incidents) OC p Fiel Environmen al CompliancA Coordinators, PRB 7 (Black SmCke incidents onry) PBU/GPMA Field Managers, (Black smoke Incidents only) GPMA Operations Engineering Technical Aida, (GPMA reports only - ATO 477) Kuparuk: Field Environmental ComplianCA Coordinators. NSK 61 (flare gas and black smoke incidents) p:~crouvs~EnvironmentaRForma~ Spill-dos agpert~ng Formo1ia2561 flare roport8a Upaetec: FEC tires Act-29-O1 OT:38 From-PRB OPERATfONS 907-659-5061 T-125 P.11/11 F-201 Oats of Occurrr3nce: FLARE GAS VENTING REPORT PS ALASKA, INC. • PRUDHOE BAY/GPMA/KU FACILITY[ tPC 10/25!2001 ^+ Flare ^ Vent (m17t/dd/yy) (Check Selection) Totaf Volume Flared: 18.25 MSCF BRLS Meter No,: 73 Pat:iill ^ PlanrtaG []unplanned (Chock Selection) (Llsbume only -Gas flared was from ^ upskreaam Q downstream (Crreck ono) of TEG contactor meter ar LPC) PERMIT NO. 9AF3-AA025 Time o curr6nce' . ~D:pO 2400 Inures From; 15:32 To: 15:35 o Qp~03 From: 15:41 To: 15:43 = (10:02 From: ~ 70: ~~ _ From: Ta = ~- From: To: _ From: To: Total Minutes Flared: - 00;05 (includes volume flared wltlch generated Black smoke, if applicable) A. DegCrlptlon of lncldent and CieuSO: (Check as marry AS needed to fully de6crlpe the inaitlgnt) X s/D 7/Ca+ 1830 for TIC St] sue to nigh exhaust temperature Seal oit system difficulties EMERGENCY SHUTDOWN Electrical / tnstrumarnaticn malfunction _, Electrical / Instrumentation malfunction at other facility (T&P) Gas trans![ system overpressure bacsung CPFIFIow Station out Excessive r insufficient Inlet ges rates into facility B. Action Token to Eliminate Cause and Prevent Recurrence: {Check and descry as applicable) X Started /restarted T/C sr 1830 X Compressor /train dapressured Retluced / increasetl inlet gas rates Completed flare testing ^„_, Corrected E&I fluctuation /failure Carr®cted E&I fluctuation /failure at other facility (T8D) Process upset in FOR section of fecillty Flaring for arlllsite shutdown /startup Flare system testing Faulty shutdown on Facility mainenance High ambient temperatures. S/D on high vibration 0~1er. _ Stabilized facility process and operakion Repaired equipment difficulties with Facility maintenance completed Other; Did incident Cause black smoke? Yes: ^ No: 0 (If Yes, continue with this section) Did incident present a potential throat to human hoatth or safety? Yes: ^ No; ^ (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Slack smoke emitted tram source: (enter tag number and description) Notified ADEC by Fax on: Date: Time: Report th9 following Inforrttatlnn to ADEC within 24 hours BY FAX (907.269-7saa): Date and time of black smoke event; From: To: Volume flared which g®nereted black smoke (if different from above): MSCF C36LS Description of steps to minimize emissionv. See Sactlon B, stave. Type o1 materials burned: Gas: x NGLs: 4thar: Caeneral Weather: Air Temperature: Wind Speed/Direction: Narne and phone number of parson making the reports E. Webb 86t3o Name ~ Phone No. Based on information and document era true, accyre Facility 5upervtsar certify that t0 DatelO'~ly `~ ~ HOC ~ytpervisor,(P~4BIt3 Glare gas and Eck sttlvfte Incidents) Field Environmental Compliance Coordinators, PRB 7 (t3iack Smoke incidents only) Pt3u/GPMA Field Managers, (81ack smoke incidents only) GPMA Operations Engineering 7ocrtnical Aiga, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (f1arA gas and black smoke incidents) P:\Groupe~nvl:onmon:aAForma~ Updgrea' FEC 6/3[3 Spill-Gas Reporting Formstt p25ot pare report#5 Oct-29-O1 07:36 From-PRB OPERATIONS 907-659-5061 T-125 P.03/11 F-201 FLARE GAS VENTING REPORT PHIL-I-IPS ALASKA, INC. ~ PRUDHOE BAY/GPMA/KUPARUK FACILITY: ~ ~ • ~•I.PC ~ '• PERMIT NO. ~ ' •..dA7~•AAO25 ~~ SAS DlsposlTloiu ~ faarc VcnL rare A Occurr® e: Dat® of Occurrence: 10/26r2001 Q p Z' ~~ f)Q:44 Minutes = (mMddJyy) (Check Selc*ctian) From: 10.67 To: 10.68 ~'ot To[al Volunto Flared: 32.77 MSGF BBLS From: 11:15 To: 11:1s = From: 11'26 To: 11-29 = U0:01 ~:0i ~~ ~ fm4ili ~ ^ Pfd ^~ unplannod From; 11'~ To: 11'44 _ (AgQtpf (yo:; ~ '~ •• • 00:01 .. . . (Check Selection} Fram: To: - ~-- From; 70: ~, _ ~. Total Minut®a FlarAtl: _ ~~`- (L/s&tms Only ^ Gas fWnaaf was from D upstream ~ downsu~m rCn~~kOne) (Includes volurr~ flared which generated black smoke, of TAG contactor meter at LPC) if applicable) A Description of Incident anrt Cause: (Check as many as neared to rally descrtpe the incident) X S/D T/C# 1 13.30 for .~ TIC sD sue to nign exnaust cQmperature Seal oil system diHiCUttI~ -.-...- EMERQENCY SNIfTWWlV Electrical! Instrumentation malfunction Electrical /Instrumentation malfunction at other taclmy IT&D) Gas transit systom overpressure ..~„~ packing CPF/Flow Station out Excessive / insutfldent inlr~t gas rates into taciFiy B. action TaKen to Ellminate Causo and Prav®nt pecurr®nce: (Ch~lc and doscrlne as appllcanle) Stared /restarted 7iC tr _ _ Compressor / train depressurad Reduced !increased inlet gas rates Completed flare testing Corrected E&1 fluctuation /failure X ~- Corrected E&1 fluctuation J failure at other facility (7&D) Process upset in section of taci~y Flaring for arfitsite snutawm /startup F{are cyst®m tastln9 Faulty shutdown on FacUiry mainlenanoe Nlgn amMent temperatures. S/f) on high vibration Other. Stabilized facility process and operation Repaired ®quipment difficulties with Facility maintenance completed Other: 1.ah down far re ir. Did incident cause black smoke? Yoe: ^ No: D (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yos: C] No; Q (If Yes, report to FI=C as soon as possible If No, report to ADEC with 24 hours.) t3lack smoke amittr3d from source: (canter tag number and desciption) Notified ApEC by Fax on: pate: T"~~ pepoR mo following Information to ADEC Wlihln 24 Hours g~aX(907^2br3-9508): Date and lime of plack smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF Bl3~ Description of steps to minimize emissions: See Sation $, above. Type of materials burned: Cas: NCat.s: ~~ Other. Genera! Weather: Air Temperature: Wind SpeedJDirec[ion: Name and phone number of parson making tt-e report: R Combs ~~ Name Phone Ho. 8asmd on information a ~ef form aft reasons qui , I certify that the statements and information in and attached to document are true, u e ~ d com I • - !S ~ ~ 1 Facility SupervisorPate EOC pervisor, P11(~are gas and black~sm~Ics3.jAretrtents) Field Vironlnt3n1a1 pliarlce Coordinator , RB 7 {Black Smoke incidents only) PBU/GPMA Field Managers, (Black smok® incidents only) GPMA Operations Engineering TeCClnical Aida, (GPMA reports only - ATO 477) Kuparuk: Fieltl Environmental Compliance Coordint;tors, NSK 61 (flare gab and blaok smoke incidents) Upnetea: FEC 898 spill-Qas RaPOAIrg FormsUO-26-01 flare report ,Oct-29-O1 07:36 From-PRB OPERATIONS 907-659-5061 T-125 P.02/11 F-201 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUpHOE i3AY/GPMA/KUPARUK FACILITY: ~ ..tPO ~. • ~~ . ..• PERMIT NO. ~ ~ ~ `:aA7~/[1ElQI~S '. ' ~.•~ : GAS pISPOSITION + Flarc vent Date of Occurrence: 10!27!2001 p ^ Ti a of Oceutr 2 e_gce: 4~ eg (mrrYdd/yy) (Check Selection) 94:Q4 from; 15:a5 To: ts:46 00:01 Total Volume Flared: t92 AASCF BBLS From: 15:49 To: T 15:48 = 50 = 5 OO:o? 00:01 Flom: 15:49 o' : 1 : " " " ~ A FalClli [~ Planned Q unplanned From: P1o Maier : 15:51 ~ Ta: 15:52 Oo:01 , . • {CheckSefeceon) From: 15 :5Z Ta: ls~~ ~ 00:01 From: To: - Total Mlnulea FWrod: - 00:05 (L1SAUrne Onry -Gas Ylared tMas from ^ upstream Q downstrcnm fCneck Ona/ (Includes volume flafBd which generated b/aCk smoke, o/ rEG contaaror maser $t cpc~ H applicable) A- Detitrlption of Incident and Cause: (Ctreck ar many as needed to sully destllDe the incident) X S/D TIG# 11330 for T/c SE) sue tc nlgn axnaust temperature Seal oil System ditClGUNdes EMER4ENCY SHUTDOWN EloCtrlcal i tnatrumentation malfunction Electrical i Inslrumentatlan malfuncllan _ at other facility (rs~D) Gas transN system overpressure packing CPF/Flow Station out ExcessNe / insuttlclat>t inlet gas rases into taa4ty Process upsotin section of tadlfly Flartnq for dralsile snutAOVrn /startup Flare ayes®m Ies4nB Faulty shuttlown on Facility maintenanoe Wlgn ambient temperatures. S/D on high vibration Other. R. Aciion Taken io Ellmtnate Cause anti Prevent Recurrence: (Check and descrige as appllcabe) X Started /restarted TIC ff 1830 Stabilized facility process and operation Compre~..sor / train depras5ured Repaired equipment difficulties Reduced / increas®d inlet gas rates `^'dh Completed flare testing Facility maintenance completed Corrected E&i fluctuation /failure Other: Corrected F-&1 fluctuation /failure at other facility (T&D) pid incident cause black smoke? Yes: ~ No: ^ (If Yes, continue with this section) Did incident pres~r>t a potenAal threat to human health or safety? Ya: ^ No: {If Yas, report to FCC as soap as possible. If No, report to ADEC with 24 hours-) 61ack smakB emitted tram source: 2SPs)2017 (enter fag numb®l' and de6cription) Notified Af)FC by Fax on: Date: Tim®: Report the follording information to ADEC within 24 Hours ,~Y FILX (9o7-Z6~7soS): Date and time of blacK smoke event: From: 10/27!2009 95:51 To: 10/27/2001 15:53 Volume flared which generated black smoke (if different from above): 34.7 MSCF (3~S Description of steps to minimize emissions: Sea Section B, above. Type of materials burned: Gas: X NCLs: ~~ Other: General Weatttaf: Air'Can~erattxe: r -2 Wind Speed/pirection; 5 MPH /South t3t3E3s) Name and phone nun1ber of parson making the r~orC ~- F Webb Name Phone No. Based an information belief form a r reasor~b inquiry, I certify that the statemeslls and information in and attached to document are true arZd co pl date ~ D 1 Facility Supe _ ~~ cc: FQC ~upervibor, PF~I# 6 ENare gas and tea c s o n aentr) Feld nVlroflms3rltAl Compliance GoorQinators, PFIB (Blank SmoKa incidents only) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aide, (GPMA reporCs only - ATO 477) Kupan,k: Field F~>vironmental Compliance Coordinatow, NSK 61 (flare gas and black smoke inctdents) ~..,r~,,,,., Updated: SEC 8198 Spill-bas fteponin0 Forms110.27.01 p911aro report Act-29-01 07:36 From-PRB OPERATIONS 907-659-5061 T-125 P.04/11 F-201. FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUpARUK FACILITY: • •)'*F~• •' ~ PERMIT N0. ~ •• 't3)0.79-AA,<t2b ~•; ~. CAS DISPOSITION Datm of t)aourronee: 10/27/2001 d Flare Q Vent TI of OCt 2 ce: 4 44 M' es (mmlddlyy) (ChecK Selectior<) 44:QQ : From: 1s:a3 To: 7~,'OS 00:02 Total Volume Ftar®d: 1o2.A MSCF BBLS From: 1$:21 To: 13:28 = 00:07 00 01 From: 19:28 To: 19:29 ~ : acll ^ Planned D unplanneA From: ' ' ~ ~ B `F Meter ~Na 76:46 ~ 70: 1366 = 00;10 . . (Ch~k Selection) From: 19 :ss To: t8^,s7 oo:ot From: 74:40 To: 14:42 = 00:02 Total Minutes Prated: ~ ~ (LlspurnA On/y -Gas !/i)IOd wars fmm [] upstream ~ downeueam (Check Orw) (Irtclltifes volume flared which g9n@rAted black S»toki9, o/ Tr=G contactor rrreter at LPC) it applicablB) A. Doscrlgtion of Incident and Cause: (CtwoK ae marry at: needed Io lolly de:Lrfhe the intiderlt) X S/D T/Cii 7 ti90 for T/C SD duo to nigh exhaust temperature Soal oll system dltgcyRies EMERGENCY SHUTDOWN EleCtficaf / Instrumentation malfunction ~~ ElectfiCal / lnstrumcntation mallunCtlon at other raciuy (r&D) ~ieb [ranstt gyslem OvBrpressurA bacKing CPF/Frow Station out E~ccessiv®/ lnsuftiaent inlet gas rates Into SaCiGly B_ Aetlon TaK®n W sliminaty Cause and Provenr Recurronce: (ChoeK and dxscripe as applicable) X Started / r~+started T/C # 1 t330 Compressor / train depressured Reduced /increased inlet gas rates Completed flare testing Corrected E&I fluctuation / failt,re Corrected E&i fluctuation /failure at other facility (T&D) Process upset In sedlon of tac~lity l=lacing for drlllslte shutdown / startup Flare system testln9 Faulty shutdown on Fadlity maintenance High amDlent temperatures. _S/D on high vibration other: Stabilexed faciliiy process and operation Repaired equipment difficulties with Facility maint+aftance completed Other: Did incidentcaus® black smoke? Yes: [) No' ^r (If Yes, conOnue with this section) pid incident present a potential threat to human Health or sdf©ty? Yos: d No: 0 (lf Yes, report to FEC as soon as possible. if No, report to ADEC with 24 hour6.) Black smoke emitted from source: (enter tag number and description} Notified ADEC by Fax on: Data: Time: Rmport the following infOt7tltrtion to AtJEC within 24 houre 9y FAX {907.269-T`~)' pate and time of black smoke event: Pram: To. MSCF BBLS Volume tlared which generated black srnolce (if differ®ni from above): ~..~ Description of steps to minimizo emissions: Sea Section 9, above. Type of materials burned: Cias: NGLS: Oth®r: , General Weather: Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: E. Webb ~vame (3ased an mrorman~ document are true, Facility upderea; QEC B/&8 the statements ~l.>d . - DJ 666Q Phone No, t0lhis w: EOC Su or, pRB~1ar~ gas and blacks to to incidents) Field Fnv mental Compliance Coordinators, PRB ! (SIaeK Smoke incidents only) PBU/GPMA Fi@Itl Managers, (Black smoke incidents only) GPMA ppetations Engin~ing Technical Aide, (C~PMA reports only - ATO 47'T) Kuparuk: Field Environmental Corrlptiance Ccordinawrs, NSK 61 (flare gas and black smoke incidents) SpiIl.Ges tleportin9 fama~l0-27.01 p~ faro repon Oct-29-O1 07:37 From-PRB OPERATIONS PHILLIPS FACILITY: ' `•~ I;RG' ~ PERAlI1TfJ0. ~ ~ ~ BATS-AA,425'. '.:'~ GAS DISPOSITION Date of Oceurc®nGe: 1 012 7/2 0 01 ©Flare I]varrt (mm/dd/yy) (Check Selection) Total volume t'lared_ 117.3 MSCF BRLS Meter No.: : ~~ ~ ~ B facili ~ p s' +^ unplannrA (GfiecK Selection) (LlsAUrrre Ong - Gas ftaretl wsalrom ^up~m ~~~~ lCh~:xona) of 7EG contt~ctor mater at t_PC) Tim e of OCG ttrrence: 00,(36 24:.44 es From: ts:a~ To: 16:0 = oo:oi From: tb:81 To: 15:34 = 00:03 From: 15:35 To: 16:98 Qa:o1 From: 1$96 70: 15:38 = 00:02 From: 1s:3s To: 1b:61 ~ 00:02 From: 1s:42 To: ts:4a = 00:02 Total Minutes Flared: - 00:11 {lrrckrdes volume flared which generated black smoke, if appric) A. Description of Incident anq Cause: (check as many as r,s9dea to fatly aescrib9 the fncidAnt) X SID T/Gh 1830 tOf +~ 7/C SD auo to nigh axttaust te:rperature SAa10ll system aliticullfes EMERGENCY SHUTDOWN EloCtflCal / Irfstrumentation malfunction Electrical / mstrumentatlan meltunctlon at other facUiry (T&D) Gas transtt system overpressure backing CPF/FIOW Station out EXCtw°Ne / inxutflClem inset gas rates into tagliry proCpgg upset in section of tacnhy Flaflng for drillsit® snutgown / stanup Flare system testing Faulty shutdown on Faculty maintenance High amDlem temperatures. S/D on high vitiation ~~- Vyter: t3. Action TBKen to Elintlnate CaUSO anq PreVOflt RecurcenCO: (CfiecK ens describe Rs eppliCabl9) X Sharied / restarted T/C # 1880 Compressor /train depressured Reduced /increased inlet gas rates ~- _ Completed flare testing Corrected E&! fluctuation /failure Corrected E&1 flucwagon / failut0 at other facility (T&D) Stabilized facility process and operation Repaired equipment di}ficulGes with Facility maintenance completed Other: Did incident cause black smoK®? Yes: Q No; [+~ (If Yes, continue with this section) pid incident preeeni a potential Threat to human health or safety? Yes: ^ No: 0 (If Yes, report to FEC as soon as possible. tf No, report to ADt=C with 24 hours.) B{aok smoke emitted from source: (enter tag number and deecriptian) Notified AAEC by Faxon: Date: Time; Report the fortowing ]ntomration to ADEC witnlR 24 hours gY FA,1S t~~'2~-~~aY Date and time of blaeK smoke event Fram: To: Volume Hared which generated black smoke (if different from above): MSCF DescripCron of steps to minimi2e emi°..sions: See Section B, above. Type of materials burned: Gas: NGLS: Other: General Weather: Air Temperature: Wind SpoedrDirection: Name and phone number of parson making the report: (* Webb Name Based on information and belief farm after re- ble inquiry, I certify that the statements ann information rn any document are true, o and co 14a. Facility Suparvis •r Date ~ ' ~~ 8680 Phone No. to rc: ~C Supprv-moo B (flare gas an !~I k3troo(ce incident) ld Envi[onmental GompUance Coordinators, PRB 7 (Black Smoky incidents only) QBU/GPMA Feld Managers, (Black stnake incidents onry) GPMA Operations EngineEring Technical Aide, (C,PMA reports only - ATO +t7~ Kuparuk: Field Ernrironmenral Compl--ranee Coordinators, NSK 8t (flare gas and Lack smoKts incidents) r+9[irn.y Upaafod: FEC 8198 907-659-5061 T-125 P.05/11 F-201 FLARE GAS VENTING f~EPORT ,SKA, INC. • PRUpHOE BAY/GPMA/KUP pBLS Spill-Gac RepoRinp Fofms110-27.01pRflare repoA Act-29-O1 07:37 From-PRB OPERATIONS 907-659-5061 T-125 P.O6/11 F-201 FLARE GAS VENTING R>=PORT ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARU Qate of Occurrence: FACILITY: I.PC GAS DISPOSITlOI 10/27/2001 ^~ Flare ^ Vent (mm/dd/yy) (Check Selection) Total Volume Flared: 66.5b MSCF BBLS Mett3r No.: B Facilit ^ Planned ^ Unpiannea (Check Selection) (Lisburne Only -Gas flared was from [~ upstream [~ downstream (Chock oneJ of rEG contaerormererat r_PC) PERMtT NO. 9A73-AA02S 71me of Occurrerce: 00:00 24:00 Minute From: 17:68 To: 1757 ~ 00:02 From: 19:27 To: lsize = 00:01- From; 19:x7 To: 19:48 = 00:01 From; 20:80 To: 20:37 = Q6~o7 From: 2o:as To: 20:48 = DD:Ot From: ~ To: _ - Total Minutes Flared: - OO:t2 (Includes volume flared which generated biaCk smoke, iiappiicable) A. IS®sCriptlon of Incident and CartSe: (Check as many a5 needed to fully deecribm the incident) X S/D 7/Cq 1830 for x 7/C Sp duo to nigh exhaust temperature Seal oil system difficultl6a EMERGENCY SHUTDOWN Electrical /Instrumentation malfunction Elecvical ! lnatrumentatlon malfunction at other facility (7&p) Gas transit system overpressure backing CPFiFIOw Station out Excessiv0 / Insufficient inlet gas rates into laciliry B. Action Taken to Eliminate Cause and Prevent Recurrence: (Check and describe a$ applicable) X Started /restarted T/C # 1930 X Compressor /train depressureq Reduced /increased inlet gas rat®s Completed flare testing Corrected Sal fluctuation /failure Corrected E&I fluctuation /failure at other facility {T~p) BiacR k 3fneke Process upset In Mf section section of faclflty Flaring tOf drillsite shutdown 1 stanup Flare system losting Faulty shutdown on Facility maintenance High ambient temperatures. S/D on high vibration Other: Stabilized facility process and operation Repaired equipment difficulties with Facility maintenance Completed Other: Did road®nt cause black smoke? Yes: ^ No: ~ (If Yos, continue with this suction) Did incident present a potential threat to Human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible. if No, report to ADEC with 24 hours.} Black smoke emitted from source: (enter tag number and description) Nokified ADEC py Fax on: Date: Time: Report the following information to ADEC within 24 hours BY Fair (807-269.7508)' Date and time of black smoke event: From: To: Volume flared which generated black Smoke ('rf different from above): ~ _MSCF BBLS pescription of steps to minimize emissions: See Section t3, above. Type of materials burned: Gas: NGts: Otnor; -- General Weather: Air Temp®rature: Wind Speed/Direction: Name and phone number of person making the report' R Combs Name 86130 Phone No. Based on informatio lies corm d fter re able inquiry, I certify that the statements and intormat'ion in and attached to document are tru , ac na co p ~ nn Facility Superv Date l+fl - yi~ ~ U ~ - EO Supervi or, t3 6 (flare gas at~iltllacK sTrtoke incidents) Fi d Enviro I Compliance Coordinators, PRB 7 (BIacK Smoke incidents only) PBUlGPMA Field Managers, (Black smoke incidents only) CaPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 67 {flare gas and black smoke incidents) P:\Groups~EnvlronmQnfBnFOrrns~ upaated~ FEC t3/98 Sput-Gas Reportln8 Formalto-27-01 ftyre reponmaster ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ~LISBURNE PRODUCTION CENTER #1 ABP EXPLORATION, ALASKA ~PRUDHOE BAY/PT MCINTYRE ~ 11/2001 ~ Disposition Volume MCF* 1. Sold 136,692 2. Reinjected 9,493,657 3. Flared or vented less than 1 hour. 1,878 4. Flared or vented greater than 1 hour 3,079.. 'r (Supplemental report re uired--See 20 AAC 25.235 5. Pilot and Purge 12,277 6. Used for lease operations Fuel 931,749 Assist 29,805 7. Other Lift Gas, Off Field 315,120 TOTAL items 1 - 7 10,94,257 8. NGL gas equivalent produced ~. 136,692 9. Purchased gas ~~ ~~ 0 10. Transferred from: ;.,> ~ ~ 0 ~, 11. Transferred to: ~ ~> ~ ~:~ 0 v . Remarks: -~ I hereby certify that the foregoing is true and correct t the best o of my knowledge. Signature:,4 '' AA , Title: V ~ ~~ 7 . ~;`.GC .~,~ Date: ~ 2 " ~ - ~ Form 10-422 (Revi~d 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent a LISBURNE NIAKUK 640144 640148 54.11% 3.96% N_PRUDHOE 640152 0.00% PTMAC W BEACH West Niakuk 666100 640186 640149 40.63% 0.00% 1.30% Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease; Use 3 ~ 7 ~ MCF 3. Consenr. Purposes MCF ~l dc„ Commis ' er ~ ~ Date ~~, t_ Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/6/2001 1731-2117 (intermittent) 127 Process SD causing x146 to vent causing Compressor 1830 to SD Unplanned Restarted compressor 1830 11/10/2001 0738-1405 (intermittent) 0 Coming back from plant upset (shipping pumps SD) Unplanned Restarted shipping pumps 11/10/2001 1612-1655 (intermittent) 0 MI compressor 1830 Normal startup Unplanned FOR compressor start up 11/10/2001 0154-0200 0 MI compressor 1830 SD due to process upset in oil section Unplanned Compressor train depressured 11/10/2001 0151-0222 0 Compressors 1801 & 1830 SD due to process upset in oil section Unplanned Restarted compressor 1801 11/12/2001 1816-1817 1 Flare valve P01070 came off seat early due to fluctuation in process Unplanned Tuned valve 11/18/2001 0528-0954 (intermittent) 0 FOR compressor SD due to a plant upset Unplanned Plant upset stabilized, Comp. Startup to occur later 11/20/2001 0505-0504 0 MI compressor 1830 Normal start up Unplanned Compressor 1830 restarted 11/23/2001 0054-01259 (intermittent) 0 Compressor 1801 SD on high temp. monitor Unplanned Restarted compressor 1801 11/29/2001 1624-2046 (intermittent) 0 MI compressor 1830 SD & restart attempt Unplanned Restart to occur later 11/30/2001 0231-1839 (intermittent) 0 FOR module shutdown Unplanned FOR startup attempts ongoing Total Flare <= 1 Hour 128 11/18/2001 1433-2154 (intermittent) 0 FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day 11/19/2001 0136-2042 (intermittent) 0 FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day 11/23/2001 0056-0358 (intermittent) 164 Compressor 1801 SD on high temp, causing 1830 to SD Unplanned Restarted compressors 1801 & 1830 Total Flare > 1 Hour 164 mx Volume Flared 292 Measured Safety Pilot 6 992 -; Continuous Assist 18,178 a ~; TOTAL FLARED 25,462 ~ ~-- r BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/06/01 1731-2117 (intermittent) 449 Process SD causing x146 to vent causing Compressor 1830 to SD Unplanned Restarted compressor 1830 11/10/01 0738-1405 (intermittent) 138 Coming back from plant upset (shipping pumps SD) Unplanned Restarted shipping pumps 11/10/01 1612-1655 (intermittent) 13 MI compressor 1830 Normal start up Unplanned FOR compressor startup 11/10/01 0154-0200 369 MI compressor 1830 SD due to process upset in oil section Unplanned Compressor train depressured 11/10/01 0151-0222 233 Compressors 1801 & 1830 SD due to process upset in oil section Unplanned Restarted compressor 1801 11/12/01 1816-1817 1 Flare valve P01070 came off seat early due to fluctuation in process Unplanned Tuned valve 11/18/01 0528-0954 (intermittent) 66 FOR compressor SD due to a plant upset Unplanned Plant upset stabilized, Comp. Startup to occur later 11/20/01 0505-0504 2 MI compressor 1830 Normal start up Unplanned Compressor 1830 restarted 11/23/01 0054-01259 (intermittent) 158 Compressor 1801 SD on high temp. monitor Unplanned Restarted compressor 1801 11/29/01 1624-2046 (intermittent) 236 MI compressor 1830 SD & restart attempt Unplanned Restart to occur later 11/30/01 0231-1839 (intermittent) 70 FOR module shutdown Unplanned FOR startup attempts ongoing Total Flare <= 1 Hour 1,735 11/18/01 1433-2154 (intermittent) 1,055 FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day 11/19/01 0136-2042 (intermittent) 368 FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day 11/23/01 0056-0358 (intermittent) 1,480 Compressor 1801 SD on high temp, causing 1830 to SD Unplanned Restarted compressors 1801 & 1830 Total Flare> 1 Hour 2,903 Volume Flared 4,638 Measured Safety Pilot 4,607 Continuous Assist 9,790 TOTAL FLARED 19,035 n ~ ~'?-; ~~ ~ c; e~.Y2 o r''' ~ ~'~ BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/06/01 1731-2117 (intermittent) 0 11/10/01 0738-1405 (intermittent) 0 11/10/01 1612-1655 (intermittent) 0 11/10/01 0154-0200 0 11 /10/01 0151-0222 0 11/12/01 1816-1817 0 11/18/01 0528-0954 (intermittent) 0 11 /20/01 0505-0504 0 11/23/01 0054-01259 (intermittent) 0 11/29/01 1624-2046 (intermittent} 0 11/30/01 0231-1839 (intermittent) 0 Process SD causing x146 to vent causing Compressor 1830 to :Unplanned Coming back from plant upset (shipping pumps SD) Unplanned MI compressor 1830 Normal startup Unplanned MI compressor 1830 SD due to process upset in oil section Unplanned Compressors 1801 & 1830 SD due to process upset in oil sectio Unplanned Flare valve P01070 came off seat early due to fluctuation in proc Unplanned FOR compressor SD due to a plant upset Unplanned MI compressor 1830 Normal startup Unplanned Compressor 1801 SD on high temp. monitor Unplanned MI compressor 1830 SD & restart attempt. Unplanned FOR module shutdown Unplanned Restarted compressor 1830 Restarted shipping pumps FOR compressor start up Compressor train depressured Restarted compressor 1801 Tuned valve Plant upset stabilized, Comp. Startup to occur later Compressor 1830 restarted Restarted compressor 1801 Restart to occur later FOR startup attempts ongoing Total Flare <= 1 Hour 11/18/01 1433-2154 (intermittent) 11/19/01 0136-2042 (intermittent) 11/23/01 0056-0358 (intermittent) FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day Compressor 1801 SD on high temp, causing 1830 to SD Unplanned Restarted compressors 1801 & 1830 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 ~ <<~~ " Continuous Assist 0 ti .> TOTAL FLARED 0 ~ a ~s ~ ~> '~,; ~... ~.:~,f ~ _~... BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS OCt-01 VOLUME PLANNED DATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/06/01 1731-2117 (intermittent) 0 11/10/01 0738-1405 (intermittent) 0 11/10/01 1612-1655 (intermittent) 0 11/10/01 0154-0200 0 11 /10/01 0151-0222 0 11/12/01 1816-1817 0 11/18/01 0528-0954 (intermittent) 0 11 /20/01 0505-0504 0 11/23/01 0054-01259 (intermittent) 0 11/29/01 1624-2046 (intermittent) 0 11/30/01 0231-1839 (intermittent) 0 Process SD causing x146 to vent causing Compressor 1830 to :Unplanned Coming back from plant upset (shipping pumps SD) Unplanned MI compressor 1830 Normal start up Unplanned MI compressor 1830 SD due to process upset in oil section Unplanned Compressors 1801 & 1830 SD due to process upset in oil sectio Unplanned Flare valve P01070 came off seat early due to fluctuation in proc Unplanned FOR compressor SD due to a plant upset Unplanned MI compressor 1830 Normal startup Unplanned Compressor 1801 SD on high temp. monitor Unplanned MI compressor 1830 SD & restart attempt Unplanned FOR module shutdown Unplanned Restarted compressor 1830 Restarted shipping pumps FOR compressor start up Compressor train depressured Restarted compressor 1801 Tuned valve Plant upset stabilized, Comp. Startup to occur later Compressor 1830 restarted Restarted compressor 1801 Restart to occur later FOR startup attempts ongoing Total Flare <- 1 Hour 0 11/18/01 .1433-2154 (intermittent) 11/19/01 0136-2042 (intermittent) 11/23/01 0056-0358 (intermittent) FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day Compressor 1801 SD on high temp, causing 1830 to SD Unplanned Restarted compressors 1801 & 1830 Total Flare > 1 Hour 0 Volume Flared 0 ~i __. Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 sa t- c ~, `a ~ t~ ~7 4% ~- BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 DATE TIME VOLUME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/06/01 1731-2117 (intermittent) 13 Process SD causing x146 to vent causing Compressor 1830 to SD Unplanned Restarted compressor 1830 11/10/01 0738-1405 (intermittent) 0 Coming back from plant upset (shipping pumps SD) Unplanned Restarted shipping pumps 11/10/01 1612-1655 (intermittent) 0 MI compressor 1830 Normal start up Unplanned FOR compressor start up 11/10/01 0154-0200 0 MI compressor 1830 SD due to process upset in oil section Unplanned Compressor train depressured 11/10/01 0151-0222 0 Compressors 1801 & 1830 SD due to process upset in oil section Unplanned Restarted compressor 1801 11/12/01 1816-1817 0 Flare valve P01070 came off seat early due to fluctuation in process Unplanned Tuned valve 11 /18/01 0528-0954 (intermittent) 0 FOR compressor SD due to a plant upset Unplanned Plant upset stabilized, Comp. Startup to occur later 11/20/01 0505-0504 0 MI compressor 1830 Normal startup Unplanned Compressor 1830 restarted 11/23/01 0054-01259 (intermittent) 0 Compressor 1801 SD on high temp. monitor Unplanned Restarted compressor 1801 11/29/01 1624-2046 (intermittent) 0 MI compressor 1830 SD & restart attempt Unplanned Restart to occur later 11/30/01 0231-1839 (intermittent) 0 FOR module shutdown Unplanned FOR startup attempts ongoing Total Flare <= 1 Hour 13 11/18/01 1433-2154 (intermittent) 0 11/19/01 0136-2042 (intermittent) 0 11/23/01 0056-0358 (intermittent) 10 FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day Compressor 1801 SD on high temp, causing 1830 to SD Unplanned Restarted compressors 1801 & 1830 Total Flare > 1 Hour 10 ;;~: Volume Flared 23 ,~ Measured Safety Pilot 513 Continuous Assist 1,391 ~, ~~ " ~ '~ ur TOTAL FLARED 1,927 ~ ~w. ~ a ;._ =: r BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-01 DATE TIME VOLUME (Msci) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 11/06/01 1731-2117 (intermittent) 2 Process SD causing x146 to vent causing Compressor 1830 to SD Unplanned Restarted compressor 1830 11/10/01 0738-1405 (intermittent) 0 Coming back from plant upset (shipping pumps SD) Unplanned Restarted shipping pumps 11/10/01 1612-1655 (intermittent) 0 MI compressor 1830 Normal start up Unplanned FOR compressor start up 11/10/01 0154-0200 0 MI compressor 1830 SD due to process upset in oil section Unplanned Compressor train depressured 11/10/01 0151-0222 0 Compressors 1801 & 1830 SD due to process upset in oil section Unplanned Restarted compressor 1801 11/12/01 1816-1817 0 Flare valve P01070 came off seat early due to fluctuation in process Unplanned Tuned valve 11/18/01 0528-0954 (intermittent) 0 FOR compressor SD due to a plant upset Unplanned Plant upset stabilized, Comp. Startup to occur later 11/20/01 0505-0504 0 MI compressor 1830 Normal start up Unplanned Compressor 1830 restarted 11/23/01 0054-01259 (intermittent) 0 Compressor 1801 SD on high temp. monitor Unplanned Restarted compressor 1801 11/29/01 1624-2046 (intermittent) 0 MI compressor 1830 SD & restart attempt Unplanned Restart to occur later 11/30/01 0231-1839 (intermittent) 0 FOR module shutdown Unplanned FOR startup attempts ongoing Total Flare <= 1 Hour 11/18/01 1433-2154 (intermittent) 11/19/01 0136-2042 (intermittent) 11/23/01 0056-0358 (intermittent) Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist TOTAL FLARED 4 165 446 615 FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day FOR Compressor 1830 start attempts Unplanned Restart attempts to resume next day Compressor 1801 SD on high temp, causing 1830 to SD Unplanned Restarted compressors 1801 & 1830 ;ax ~Yrc' ~`i: ~• ~, ~ $°^ ~~ p sa `, ~:a x-r- x ~• ~...,. " .! ~.':.3 (':'} m C ~7 Y!" "F.' Nov-OB-OI 12:04 From-PRB OPERATIONS 90T-659-5061 FLARE GAS VENTING REPORT PHI~LiPS ALASKA, 1NC, • PRUDHOE BAY/GPM T-143 P.02/02 F-242 K FAC[LETY: ... •:bpC ;:.. :: ~~ Pt=RMIT NO. ~ A1179~A7[,G26:• .:. ~ ". GAS DISPOSITION Date of 8eeurrence: 11/t3h20Qt ©~l:rre ^ vent (mrNdd/yy) (Check Selection) Total Volume Flared: 591.16 MSCF BBLS MAtd~l~lllo.: •: ~~ : `6~1 ~. B Fa4ifi • • []Planned DUnplanned (Cluck Selection) (Lisburne Only • Gas horse was from ^ upsrreynr ~doemstream (Crick OnoJ of TEG cbn(acto~ meter at LPC) Time of Occ urrent®; 9lZQQ ?d_„Af1 Minutes From: 17:31 To: 17:39 = 00;06 From: 1s:S1 To: 19:52 a 00:01 From: 20:28 To: 20:40 00:1 t From: 20:58 To: 21:1 a 00:2A From: To: _ From: ~ To: ~~ m Total MinrRes FlarAtl: c 00:42 (Includes volurllo /laced which generated black smoke, ifappfrcaWe) A. l~oscription of 1ncIg6M and Cause' (Cr1ecK as many as neegeq to lolly describe the IflCldent) _-- s/D TiCx for ,~_ 7/C &D due to fllgh axt-aus[ [emperature Seal oil system tliltk;uliies twnn~RGENCY SHUTDOWN Elodficef r IrrstnumentaTion malfunction Electltcal r InsVumentatiorl mattunctlon a< Other faciHry (1'&Dj Gas transit system overpnessure _ X __ backing CPf=rFlow station out F,xoe~ro / insuNiCient inlet pas rates into ladliry B. Action Taken to Ellminafe Cause anq Provollt Recurrence: (Cr1eGr and describe ae appllCable) X Starteq /restarted T/C # 1 gap Compressor /train depressured Reduced /increased inlet gas rates _,,,_ Gompletad Flats testing ~` Corrected E&I fluctuation /failure Corrected E&1 fluctuation /failure at other faeiliry {T&p) Black Smoke, Process upset In section of Tacf~y Flaring rot drillsite shutdown / s1anup Flare system tasting Faulty shutdown on !"ac~lty maintenance NEgh amUlent temperatures, S/D on high vilxation Other; Process shutdown cat,~i x148 to vent causing 1830 compressor to s/d Stabilized facility process and operation Repaired eQt,dpmont difficulties with Faciiiry -naintenance compl®teq Other; Did incident cause blacK smoke? Yes: Q No: ~ (If Ye6, continue with this secgort) Did incident present a potential threat tQ Human health or safe ~ (If Yes, report to FEC as soon as possiWe_ If No, report to ADEC with 24 hours.) Yom. ^ No: A Black srrloko emiMed from sourc®: (enter tag numb®r and description) Notified At?Et: by Fax on: Date: Time: Report Ur® following intomlatlon to ADEC within 24 hours RY FAX (9o7-26st`7508): Dat® anq time of black smoke alrent: From: 70: Volume flared which generated black smoKa (if different from above): MSCF Description of steps to minimize emissions: See Section B, above- Typo of materials burned: Cias: NQLs: Other: Cameral Weathcar. Air Temperature; Wfnd Speed/pirection;_ Name and phone number of person making the repot Ted Wood Name G58-BB6C Phone No, nasea on mtormation and belief formed after r~asorldbla inquiry, I certify that the statements and information in and attaetled to this document are true, accurate a p Facility Supervisor Date Q FOC Supervisor, R B (flare gas and black smoke incident.) Field Environmrflrttal Compliance Coordinators, PRB 7 (Black SmoKe irlCidents onty) P8U/GPMA Field Maa>sgerr, (Black smoK® incidents only) GPMA Operations Engineering Technical Aide, (GPMA reports only - ATO 477) K~aruk: f=ield Ernironmenttol Compliance Coordinators, NSK Bl (tiers gas and bldCk Sf[1Dk6 inCldf3n[S) BBLS - ~i~ . ~ ~ ' r. ax ~•~ <_. x.,.:, ~"` ~. upaatotl: FEC Erse Splll•Gas Reporting Farms\t 1070111are report Nov-24-O1 10:10 From-PRB OPERATIONS 907-659-5061 T-171 P.02/09 F-292 FLARE GAS VENTING REPORT ~ ~ 0~ ~ PHILLIPS ALASKA, INC. • PRUDHOE SAY/GPMA/KIJPARUK FACILITY: LPC PHRMIT NO- _ 9A'~3-AA025 Date of Occurrence: t t /19/2001 G Plan ^ vent (mrn/ddlyy) (Check Selection} Total Volume Flared: 368 MSCF BBLS Mater f'a0 , kl FaGI It ^ Planned ~] Unplanned (Check Setoction) (Liatrum© Only -Gas flared was from ^ upstream C downstream (Cnack One) of TEG coniaCtor mater ar LPCl Time of Occu[rencra: QQ;O 24:00. Minutes From: 01:96 To; 01:37 = OO:o1 From: 02:13 To: 02:14 = 00:01 From: 02:27 To: 0228 = DD:01 f=rom: D2:34 To: 82:35 = 00:01 From: a2:a7 70; 02:48 m oo:ot From: 02:49 To: o2:ss = oo:DB Total Minutes Flared: = 00.11 5 o1i12® (Includes volume flar®d which garteraied black Smoke. If applicable) A- Oeacription o1 incident and Cause: (CheCK as many as noatled to fully dBSCribe the Inctdent} S/p TiCrr for T/C SD due to Mgh exhaust tamp9rature Saal oil System difficutGes EMERGENCY SHUTDOWN Electrical / Instrumentation malfunction Electrical f Instrumontatlon malfunction at other faculty (T&D) Gas transit system overpressure X bacKing CPF/Flow Station out Excessive / insutliclent Inlet gas rates into facility B. Action TaKen to Eliminate cause and Prevent Recurrence: (Chock and describe as applicable) Staged / restanad T(C # Compressor /train depressured Reduced !increased inlet cdas rates Completed flare testing Corrected F&I fluctuation /failure Corrected E&I fluctuation /failure at other facility (T&D) Black Smoke Process upset in section of facility Flaring for drilislte gltutdown /Startup Flaro system testing Faulty shutdown on Facility maintenance wish ambient tempara:ures. 5/P on nigh vibration 4iher: 1834 FOR comp start attemo~. Staoillzod facility process and operation Repaired equipment difficulties with Facility maintenance completed Other: pfd Incident cause black smoke? Yes: ^ No: ~ (If Yes, continue with this section) Dld incident present a potential threat to human health or safety? Yes: ^ No: (If Yes, r®port to FEC as soon as possible. if No, report to ADEC with 24 hours,) Black smoke emitted from source: ,~ (enter tag number and description) Notified ADEC py Fax on: pate: Time: Report the following Informailon to ApEC within 24 hours BV FAX (907.269-7508): Data and time of black smoke event: From: To: volume flared wrtiCrl generated black smoke (if different from above): MSCF Description of stops to minimize omissions: See Section B, above. Type of matorlals burned: Gas: NGLs: Other: General Weather, Air Temperature: Wind Speed/Direction, Name and phone number of person making the repo ; n I Name Based on information and belief forrttea artf document are true, accurate and complete. Faculty Supervisor and Date ~ bl~(/`~~~( ra ~,~ .~,~ ~~ ~ a= ~~ ~~ BBLS Phone No. cc: EOC Supervisor, PR (flare gds and black smaka incidents) Field Environmental pliance Coordinators, PRB 7 (Slack SmoKe incitlents only} PSU/GPMA Field M a ors> (Black smoke incidents only) GPMA Operations Engi Bring Technical Aida, (GPMA reports only - ATO 477} KuparuK: Field Environmental Compliance Coordinators, N5K 61 (flare gas and black smoke incidents) P:U3 rouDS\En~ironmental\FOrmS\ Upds:ea; fECarea Spill•Gas Repomng Forms\tt-t9-otpgr Nov-24-O1 10:11 From-PRB OPERATIONS 907-659-5061 T-171 P.03/09 F-292 PLAR~ GAS VENTING RBPORT P~£ 2 0~ ~ PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KLIPARUK FAGIDITY: f.PC PERMIT NO. 9A~'3-AAQ~G GAS DISPOSITION Date of Occurrence. 11/19/2001 ~Harc ^vent Time ofOecurrence: (mm/dd/yy) (Cnack Selection) Q{,~:oU 24:00 Minu >=rom: 03:29 To: 03:28 _ = 00;01 Total Volume Flared: MSCF BBLS From: From: 03;48 _ To: os;49 = o4•s9 To: 0443 ~ = 00;01 oo•oa ; ~ Fact it ^ Planned Q Unplanned FrOrn: o MetdC N 04:47 To: 04.49 ~ = 00:02 , , (Ch9CK S®lection) From: 05:21 To: 05:22 = 00;01 From: 05:43 70: 05:45 = 00:02 Total Minutes Flarctl: - 00;11 (Lisoume Only • Gas flared was from ^ ypstream ~ downstream (CAeck Ono) (InGludos vo(umB frdrod which gerterafOd black SR1okB, of TEG contaCtol meter at LPG) irappllcable) A. Description of Incident and Cause: (ChecK as many as n®otled to fully describe the incident) S/D TlCti for T!C SD tlu6 SO high exhaust temperature _ Goal oil sys~em difficulges EMERGENCY SHUTDOWN Electrical /Instrumentation malfunction ,~ Electrical / Instrumentation malfunction at other facility (TB.D) Gas transit system overpreSSUrB X packing CPFlFIOw Station out Excessive / Inaufficitlnt inlet gas rates into facility B. Action Taken to Enllminata Cause and Prevent Recurrence: (ChocK and describe as applicable) 5tarteq / r®started T/C >'f Compressor /train d9pressured R6duced /increased Inlet gas rates Completed flare testing Corrected E&I fluctuation /failure Corrected E&1 fluctuation ! failure at other facility (T&p) Process upset in ,action of facility Flaring for drltlsite shuttlown /startup FI2tr0 gygtem testing Faulty shuttlawn on Facility maintenance Nigh amplant temperatures. S/D on high vibration Other: 1830 FOR comp start attempts. _ Stabilized facility process and operation Repaired equipment difficulties with Facility maintenance completed other: Did Incident cause puck smoke? Yes: ^ No: 0 (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours-) slack smoke emittea from source: (enter tag numnor and description) Notified ApFC by Fax on: Date: 71me: _ Report the following Information W ADEC within 24 hours B Ax (907-268.7508): Date and time of black smoke event: From: To: Volume flared which generated black smok® (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type o} materials burned: Gas: NGLs: Other General Weather: AlrTemperature: Wind Speed/Direction: Name and phone number of person making the report: Name Phone No. Based on information and belief forrtiaa after reasonable inquiry, 1 certify that document are true, accurate and complete. Facility Supervisor pate anachod to cc: EOC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinator, PRB 7 (Black Smoke incla®nts only) PPU/GPMA Field Managers, (Slack smoke incidents only) GPMA Operations Engine9Cing Technical Aide, (GPMA reports only - ATO a77) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents} P'\Groups\Enviro~mentanForrrul upcatec; FCC f3l98 spt~i-C,as Roporung Forms\tt•19.01pg2 Nov-24-O1 10:11 Date of Occurrence: From-PRB OPERATIONS 90T-659-5061 T-1 T1 P.04/09 F-292 ~~~~ ~~~ FLARE GAS VENTING REPORT PWILLIF'S ALASKA, INC. • PRUDHOE BAY/GPMAI FACILITY: CPC PEpFA1T NO 1t/19/2001 OFlare ~VCnt (mm/dd/yy) (Check Selection) 9AT9,AA025 Time of flccurren~: 00:00 'x:00 Minutes From: 05:47 To: p5~48 = 00:01 From: 06:45 To: 06:06 = 00:01 From: 0609 To: 06:11) = OD:Ot From: os:t2 To: oa_iS = 00:01 From: Q6:22 To: 06:29 = 00:01 From: os:s2 70: Oe:Ss = 00:01 00:06 Total Minutes Flared: = (includes volume flarBd welch genarar9d black smoKO. if dpprlcableJ Total Volume Flared: _,~MSCF BBL5 star No.: E~ Fat:lllt ^ Plannetl Q Unylannea (Check SAIACIIOn) (Lfspurne Only • Gee freretl was from ^ upstream ~ aownstreant (Cheek One) of TEG contactor motor at 1_PC) A_ Description of Incident and Causo: (Check a9 many ag needed to fully describe the InCitlontl S/D 7/Gf for TIC SD due t0 high exhaust temperature Seal oil System difficulti0s EMERGENCY SHUTDOWN Electrical / lnetrumantation malfunction Electrical /Instrumentation malfunction at other facility (7&Q) ~~ Gas transit system overpressure X backing GPF/Flow StAtion out Excessive / in8utficieni inlet gas rates InT0lac,lity B. Attton Taken to Eliminate Causo and Prevent Recurrence: (Check and describe as applicable) Started /restarted 7/C if Compressor /train depresSurAd ~_ - Reduced /increased inlet gas rates Completed flare te6ting Correct®d E&I fluctuation /failure Corr®cted E&t fluctuation /failure at other facility (T8~D) Process upsBt in section Of facility Flaring fflr drillsito shutdown / stanup Flare system testing Faulty shutdown on Facility maintenance High ambient temperatures. S/D on nigh vibration Other: 1830 FOR comA start attempts. Stas~illzod facility process and operailon Repaired equipm®nt difficulties with Facility maintenance completed Ocher: Did incident cause black smoke? Yes: ^ No: (] (If Yes, continua with this section) Did incident preSAnt a potential throat to human health or eatery? Yes: ^ No: [~ (If Yes, report to FEC as soon as possible. If No, report to ApEC with 24 hours.) Black smoke omitted from source: (enter tag number and description) Nokified ADEC by Fax on; pate: Time: Report the following Information to AAEC within 24 hours BY FAX (907-269-7508)' pate and time of black Smoke event: From: 70: Volume flared which generated bIaCK smoke (if different from above): MSCF BBLS Description of steps to minimize emissions; SAS Section S, above. Type of materials burned: Gas: NGLs: Other: General Weather: AirTemporature; Wind Speod/Direction: Name and phone number of parson making the report: Name Phone No. Based on Information and belief formed after reasonable inquiry, I certify that the staterr document ar® true, accuralo and comp)®to, Facility Supervisor Date and information in and attached to Cc: EOC 5upenrisor, PRB B (llaro gas and plack smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) f BU/GPMA Field Managers, (Black smoke Incidents only) GPMA Operations Enginaering Tecflnical Aide, (GPMA reports only • ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NS1< 61 (flare gas and black smoke Incident6) P.\Groupe~Enw ronrnon~~FOrms~ Upderea; FEC e/ea Spill•Gsa Reporting Forme~tt-t9.01pg3 Nov-24-O1 10:11 From-PRB OPERATIONS 907-659-5061 T-171 P.05/09 F-292 FLARE GAS VENTING REPORT P~r~ L.~ pF fd - PHILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FAGIL,ITY: LPG PERMIT NO. 9A73-AAQ25 GAS DISPOSITION Flare vent Dais of Occurrence: 19/18/2001 Q TIrn6 of Ot:C r1a r9nCe: atinut 24:D0 (mm/ad/yy) (cneck selectaon> 00;40 From: - 09:39 To: 09:x1 - 00.02 ToWI Volume Flared: MSCF BBLS From: From: 10:52 70: 10:54 = 00:02 11:08 To; 11:10 n 00:02 Meter Ma.: D Facltft ^ Planned ~ unDlannea From: 11:30 To: 11:32 = 00:02 (Check Selection) From: 11:57 T0: 11:58 = D0:01 From; 12:34 Yo: 12:35 ~ 00:01 tal M1nutOS Flared: 00;10 S T o {t.isburno Only -Gas flared Wag from ^ upstream ~ downstream (Chock one) (InciudBS volume flared which genersfed black smoKe, of TEG corlfaotor mBfAr at LPG) if applicable) A. Description oT Incident and Cause: (ChoeK as many as needed to fully describe the lneidant) S/p T/C# for Process upsetln T/C SD due to hlgn exhaust temperaturA .action of faclllzy Seal oil system diffiCUltlas Flaring for driilsite shutdown /startup EMERGENCY SFitJ7poWN Flare system testing l=lectriC81 I Instrumentation malfunction Faulty shutdown on Electrical / Instrumentation malfunction ~ Facility maintenance High ambient temperatures. at omor tadlRy {T8D) S/C} on high vibration, Gas transit system overpressure x Other: 1830 EQR comp start attempts. CPFlFIOw Station out bacKin g ,~ F~ccessiv©/insufficient inlet gas rates Into facilit y B. Action Taken to Eliminate Cause and Provent Reourrence: (C1tBCK and describe as applicable) Started /restarted T/C # Stabilized facility praoess and operation Compressor / train dopressured Repaired equipment difficulties Reduced /increased inlet gds rates ~ with Gompleted flare testing Facility maintenance completed Corrected E&I fluctuation /failure Other: Corrected E&I fluctuation !failure at other facility (T&D) 61ack Smoke Did incident cause black Smoke? Yes: ^ No: 0 (1# Yes, CCntinue with this Ssctian) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon as possible, if No, repoR to ADFC with 24 hours,) Black smoKe omitted from bource; __ (enter tag number and description) Notified ApEC by Faxon: Date: Tim®: Report the tollowing Iniormatlon to ADEC within 24 hours BY FAX (907-269-7508): Date and time of black smoke event: From: To: BLS Volume flared which 9eneratad black smoke (it different from above): MSCF S Pescriptlon of slaps to minimize emis6iorts: See Section S, above. Typo of materials burned: Gas: NCa~s: Other: General Weather: Air Temperature: Wind Speed/Direction: Name anq phone number of person making the report: Name Phone No. Based on information and belief formed alter r0asonable inquiry, 1 certify that the statements and information in and attached to this document are true, accurate and complete. Facility Supervlsar Date ce: EOC Supervisor, PRB 6 (hare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Slack Smoke incidents only) Peu/GPMA Field Managorv, (Black smoke incidents only) GPMA Operations Engineering Technical Aida, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke Incidents) P:1G ro ups\E mi ronrn a nrartFOrm s \ updated: FFC 6198 Spill-Gee Reponing Forrt+slz1-19-01pg4 Nov-24-O1 10:11 From-PRB OPERATIONS 907-659-5061 T-171 P.O6/09 F-292 FLARE GAS VENTING REPORT P~ ~ a F 8 PMlLL1PS ALASKA, INC. • PRUDHOE SAY/GPMA/KUPARUK FACILITY: ~ LPG PERM17 NO. 9A~-AA025 Date of Occurrence: 11/19/2001 ~ Flare ^Vent (mm/dd/yy) (Check Selection) Total Volume Flared; MSCF ~BB~S Meter a.: ~ Facil#t ^ Planned ^ unplannotl {Check Selection) (Lisburne Only - GaS flared wag from ^ upstream Q downstream (Check One) of 7EG contactor meter at CPC) Time of l3ccurren. ~:~Q 2~.2 tnute6 From: 18:1Q To. 13:11 ~ 00:01 From: 13'36 To: 13:37 = 00;01 From: 14:00 To: 14:01 = 0001 From: 14:26 To: 14:28 = 00;02 From: 14:64 To: 14:56 = 00:02 From: 1x:23 To: 1s:2a = 00:01 Total Minutes Flared: 00:4$ (includes volume Ilarod which generated black btttoke, if applicable) A. Dcscrlptlnn of lntftlBAt and Cause: (Check as many es needed to Sully describe the Inctdent} SID 71Ctt for _ TIC SD duo to high exhaust temperature Seal oiE system difficulties EMERGENCY SMUTI)OWN Electrical /Instrumentation malfunction Electrical /Instrumentation malfunction at other faculty (T&o) Gas transit system overpressure X packing CPFlFIow Station ouI Excosslve /insufficient Inlet gas rates Into facility Process upset in seCtifln of facility Flaring for arlllsite shutaown /startup Flare system testing Faulty shutdown on Facility maintenance High ambient temperatures, S/D on nigh vibration Other: 1830 FOR cam star ahem ts. 6. Action Taken to teNminate Cause and Prevent Recurrence: (Check and describe as applicable) Started /restarted T/C # Stabilized facility pros®ss and operation Compressor /train d®pressured Repaired equipment difficulties Reduced /increased inlet gas rates with Complatoq flare testing Facility maintenance completed Corrected E&I fluctuation /failure Other: Corrected E81 fluctuation /failure at other facility (T8D) Did incident cause blacK smoke? Yas: ^ No: ~ (If Y®s, continue with this section) Ditl incident present a potential threat to human Health or safety? Yes: ^ No: [] (If Yes, report to FEC as soon as possible. If No, rep4R to ADEC with 24 hours.) Slack smoke emitted from source: (enter tag number and description} Notified ADEC by Fax on: Dat®: limo: Repflrt the fallowing intormatfart t0 ADEC within 24 flours gY FAX (1307-265.7508): Pate and time of black smoke event: From: To: Volume flared which generated black smoke (if difforont from above): MSCF BB~S Description of steps to minimize emissions: See Section B, above. Type of mater[als burned; Gas: NGLS: Other: General Weather: Air Tomperaturs: Wind Speed/Direction: Name and phone number of person making the report: Name Based on information and belief formed after reasonable inquiry, I certify that the statements document era true, accurate and complete. Facility Supervisor Rate Pnona No, cc: EOC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coortllnators, PRB 7 (Black Smoke ineldonts only) PBU/GPMA Field Managers, (Black smoke incltlonts only) GPMA Operations Engineering Technical A(de, (GPMA reports only - ATO 477) Kuparuk; Field Environmental Compliance Coortllnators, NSK 81 (flare gas and slack smoke incidents) P:\G rcups\En~ironmental~FormB~ upaaroa: Ft=_c ass Spill-c3as Reporting Forma~ll-t9.01pg6 Nov-24-O1 10:11 From-PRB OPERATIONS 907-659-5061 T-171 P.07/09 F-292 FLARE GAS VENTING REPORT P~~ (p B F. ' P~IILLIPS ALASKA, INC. • PRUDHOR BAY/GPMA/KUPARUK FACILITY: LPC . PERMIT fu0- sA78-AA02,5 GAS DISPOSITION Date of Occurrence: 11/19/2001 d Flare ^vent Time 00 00 ceurrenc ~Qq Minutes (mm/dd/yy) (Check 5electlon) From: : 15.62 To: 15~s3 ~ 00:01 Total Volume Flared: MSCF BBLS From: ~- 16.22 1s sa To: 16:28 = = To: ta:s6 Qo~01 00:02 From: Meter' TtA„ 8 Fac)Ift ^ Planne0 Q Unplanned From: ~ 17:22 = Yo: 17:23 = 00:01 {Check Sofection) From: 18:18 70: 1a;23 = 00:05 From: 1828 To: 18:90_ 00;02 i t Flared: = OO~t2 O nu Total pg es (Lisburne Onry -Gas flared was from ^ upstream Q downstream rChecx Onel (IRCfudos volume flared wh ich 9enorarad black smoke, el TEG conracror meter ar LPC) if app!lcable) A. Description of 1nCldent and Cause: (Check as many es needed to Cully dosCribe the incident) S/D T/C# fOr TiC SG due to high exhaust temperature Beal oil cystam difficulties EMERGENCY SHUTDOWN Electrical /Instrumentation malfunction ~^_ Eloctncal/lnstrumontatlon malfunction at other 1aCiliry (7&D) Gas transit system overpressurs X bacKin9 CPF/Flow Station out Excessive / insuTticlent {nlet gas rates into facility B. Action Tekon to Eliminate Cause and Prevent Recurrence: (ChecK and deacritse as appllcabte) Started /restarted T/C # .~- Compressor /train depressurad Reduced /increased inlet gas rates Completed (rare testing Corrected E&I fluctuation !failure Corrected E&I fluctuation /failure at other facility (T&D) Arocess upsatln section of facility Flaring for tlrillSite Shutdown / Startup Flare system tesUne Feuity Shutdown on Faoili[y maintenance rilgn ambient temperatures. SID on high vibration Otnor: 1838 FOR comp start attempts, Stabilized facility process and operation Repaired equipment difficulties with Faellity mainkenance completed Other: Dld incident cause black smoke? Yes: ^ No: ~ (If Yes, continue with this section} Did incident present a potential threat t0 human health or safety? Yes: ^ N°~ (It Yns, report to FC=C as soon as possible. If No, report to ADEC with 24 hours.} Black smoke emitted from source: (enter tag number and description) Notified ADEC by Fax an: Rate; 71mo: Report the totlowfng information to ApEC within 24 Hours By FA7( (9ta7-269-75t]Bj: Date and time of black srrroke event: From: To: Volume flared which gen®rsted black smoke (if tlitferent from above): MSCF D®scription of steps to minimize emissions: Sae Section B, above. Typo of materials burned: Cass: NGLs: Other; General Weather: Air Temperature: Wind Speed/Direction: Name and phone number of person making the repoR~ Name aasoa on tnrormauon artu Wren, runuou our document are true, accurate and complete. the BBLS Phone No, in and attached to Fdclllty gupervisor Date cc: EOC Supervisor, PRB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PI3B 7 (Black Smoke Incidents only) P8U/GPMA Field Managers, (t3lack smoke incidents only) GPMA Operations Engineering Technical Ald®, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Gomplianco Coordinators, NSK 61 (flare gas and black smoke incidents) p:\Gro~pe\En v ironm ontan~arma~ Uptldcoq; FCC 8/9B spn~-Gas Reporting Formaltt•18-oipgb Nov-24-O1 10:12 From-PRB OPERATIONS 907-659-5061 T-171 P.08/09 F-292 Date of Occurrence: FIJ>-RE GAS VENTING REPORT P A~~ 1 0 ~' ~ PHILLIPS ALASKA, INC. • PRUAHOE BAY/GPMA/K~PARUIC FACIpITY: CPC PERMIT NO. 9A73-A402S _ 11 /19/2001^ Flare ^ Vent (mm/dd/yy) (Check Selection) Time of Occ urrence: . 00;00 2A:00 Minutes From: 18:32 To; 1 E:34 = 00;02 From: t8:3s To: 1a:ae ~ = oo:oi From: 1s:aa To: 1a:a8 _ 00:02 From: 1s:5o 70: is:s1 ~ = 00:01 Fram: :05 70: 20 20:ofi OQ:oi From: ~ 20:81 To: 20:33 = 00:02 Total Minutes Flaed: _ .00:09 Total Volume Flared: MSCF BBE_S t~[:ter No.: ~ 8 FdC4ft, ^ P:anricd ^ unplannea (Check Selection) (Liaburno Only -Gas Rsred was from ^ upsaeam ~ downstream {Crteok Ona) of TEG contactor meter ar LPC) (Includes volume flared wAicn generated black smoke, If applicabre) A. Doscrlptlon of Incident and Cause: (Check as many as nccded to fully describe the incident) SrD T/C+t far 7/C Sp due to high exhauss temperawr® Seal oil system difficultims EMERGENCY SHUTDOWN Electrical / Inetrumentatlon malfunction Electrical / lnstrumentatlon malfunction at other fatiliry (T&D) ~- Gas transit system overpressure X backln9 CPFlFIow Station out Excessive / insufflGent inlet gas rates into fadlity S. Action TeKen to Eliminate Cause antl Prevent Recurrence: (ChecK and describe as appflceble) Started / rAStartod T/C # ~~ Compressor /train depressured Reduced / increased Inlet gas rates Completed flare testing ~, Corr®cted E&I fluctuation /failure Corrected F&I fluctuation /failure at other facility (T&D) Did incident cause black smoke? Yes: L7 No: ^ (If Yes, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (if Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: (enter tag number and description) Notified A(}PC by Fax on; Date: _ Tlme: _ Report the following lnformatlon to ADEC within 24 hours BY FAX (907-2b&-7508): Date and lima o1 black smoke event: From: To: Volume flared which generated black smoke (if different from above): ~, MSCF BB<rS poscription of stops to minimize emissions: See Section B, above. Type of materials burned: Gas: NGLs: Other: General Weather; Alr Temperature: Wind Speed/pirection: Name and phone number of person making the report: Name Phone No. Based on information and penof formed attar reasonaale Inquiry, 1 pernry Lna[ U la a~a,an,oi na a~ i~ .~ •~~• • • ~~•••-• • •• • -~ ~• document era true, accurate and complete. Facility Supervisor Date c:c: EOC Supervisor, PAB 6 (flare gas and black smoke incidents) Field Environmental Compliance Coordinators, PRB 7 (Black Smoke Incidents oMy) PBU/GPMA Field Managers, (Black smoke incidents only) GPMA Operations Engineering Technical Aitle, (GPMA reports only - ATO 477) Kuparuk: Fiala Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incld®nts) Process upset in soctlon of facility Flaring for driustte shutdown r startup Flare system tosting Faulty shutdown on Facility mainenance Nign ambient temperatures. S/A 4R high vibration Other: 1830 FOR comp start attempts, Stabilized fac[Ilty process and operation Repaired ®quipment difficulties with Facifiry maintenance completed Other: p:\G rou pa1E nvl ton man[sl ~FOrma\ Updd[ad~ FEC 8198 Spill-Gsa Repornng Fama11 i-19.O1pg7 Nov-24-O1 10:1Z From-PRB OPERATIONS 907-659-5061 T-i71 P.09/09 F-292 FLARB GAS VENTING REPORT ~~.~ Pp a N ~ ` pWILLIPS ALASKA, INC. • PRUDHOE BAY/GPMA/KUPARUK FACILITY: LPC PERMlT NQ. 9A73.AAD25 GA5 ~ISP~5ITION Date of Occurrence: 11/19/2001 Q Flare ^ vent Time o Occurre ce: (mm/dd/yy) (Check Sol®ction) o:oD 24:00 Mlnut From: 20:35 To: 2b~38 OO~01 Total Volume Flared: MSCF ~BB~S From: _ 20:SH To: 20:k2 = 0_ 0:~4 From: To: _ fdfeter NA•; 8 AaC11it ^ Planned ^ unplannEd From: 70: _ (Check Selection) From: To: _ From: ~- To: _ Toiai tUllnutes Flared: - 00:05 (LfsDUrne Only • Gab tlarotl was from ^ upstream ^ pownetream fCneck One) (Includes volumA l/ared whiCM generated black smoke, of TEG contactor motet at LPC) i/ applicable) A. Description of Incident antl Cause: (Check as many as needed to fully describe the incident) SID T/C# for T/C SD due to high exhaust temperature SAaI ell system diiflcuities EMERGENCY SHUTDOWN Electrical / Instrumentation matfuncpon ,_~ Electrical / Instrumentation mallunctlon at other faoility (T&D) .._...- Gas transit system overpressure X haoking CPF/Flow Station out Excessive / insufllcient inlet gas rates into facility B. Apt)on Taken to Eliminate Cause and Prevent Recurrence: (Check and describe as applicable) Stacked / rostartatl 7/C # Comerossor /train depressor®d Reduced !increased inlet gas rates Completed flare testing ~- Corrected E&I fluctuation / failure Corrected E&I fluctuation !failure at other facility (T&D) Process upset in ,action of facility Flaring for drillsito shutdown I Startup Flare system testing Faulty shuidown on Facility maintenance Nigh amolent temperatures. S/D on high vibration Other: 1830 EOA comp start attempts, Stabilized facility process and operation Repairaa equipment difficulties with Facility maintenance Completed Other: Did incident cause black smoke? Yes: ^ No: ~ (1f Yes, Continue with this section) pfd incident present a potential threat to human health or safety? Yes: ^ No; ^ (If Yes, report to FEC as soon as passible. If No, report to ADEC Wlth 24 hours.) Black smoke emitted from source: (enter tag number and description) Notlll®d ADEC ny Fax on: Dater Time; Report the following Information to ADFC within 24 hours sr FAX (907-269-7508): Date antl time of black smoke event: From: To: Volume flared which generated black smoke (if different from above): MSCF - _$BLS Description of steps to minimize omissions: See Section B, above. Type of materials burned: Gas: NCaW: ~,_ Other: General Waather: Air Temperature: wind Speedlgirection: Name and phone number of person making the report: Phone No. Name Based on information and ballot tormeo one aocument are true, accurate and complete. statements Fac)lity Supervisor Date cc: EOC SupeNisor, PRS t3 (flare gas and black smoke incidents) Field E=nvlronmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) I=BU/GPMA Flald Managers, (Slack smoke incidents only) GPMA Operations Engineering Technical Alao, (GPMA reports only - ATO 477) Kuparuk: Field Environmental Compliance Coofalnators, NSK 61 (flare gas and blacK smoke incidents) P'1Gmup&1£nvironm8ntal~Forms\ Sp:A-Gas Roparting Fomt~~t ~ -t 8-Ot P9e VpgAted: FEC 9/98 Nov-26-O1 05:47 From-PRB OPERATIONS 907-659-5061 T-179 P.02/03 F-303 ~~ FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC. • PRUDHOE F3AY/GPMA/KUPARUK I FACIi-ITY: I~RC PERRAIT N0. 9A'T3~AAQ29' GAS DISPO ITION Date of Occurrence: 11/23/2007 ~ flare Q vent Time of Oct:urrenoa: (mm/dd/yy) (Check Selection) 00;00 ~,oo Minutes From: o0~ss To: oo:5s ~ 00:02 Total Volume Flared: 1658.2 MSCF pBLS From: t12:d7 To: 02:08 = 00:01 From: orie To: o2~i9 = 0001 Meter No.^' D Faoil)t ^ Planned ^~ Unplanned From: 02:33 To: 02:3b = 00;02 (CheCK Selection) From: 02:39 70: 03:68 = 01:18 From: 70: _ total Minutes Flared: - 01:25 (!.)sbume Only • G&a flared w&s from ^ upstream [~downatream (Grteck One) (1tlClvdaS VOIuR7e fisted which gBnefdtBd 618Ck srr'IOkA, of TEG contactor metAr at t:PC) if applicabfe) a. Description of Incident and Cause: (ChocK as many as needed to fully describe the Incident) S/D T/C# for TiC Sp due to high exhaust temp®tature Seal oil system dlffk:ulties EMERGENCY S11t1TDOWN X Electrical /Instrumentation maltunction Elmctrieal / Inatrurnenta~lon maltunction at other facility (T&t)) Gas transit system overpressuro X backing CPF/Flow station out Excessive / insutticient inlet gas rates into facility 8. Action Taken to Eliminate Cauaa and Prevent Recurrence: (Check an4 describe as applicable) X Started / restartetl T/C # 1801 & 1 t330 comp. "~ Compressor /train depressured __ Reduc+3d /increased inlet gas rates Compietod flare testing Corrected E&I fluctuation !failure Corrected E&t fluctuation /failure at other fatality (T&D) process upset In section of facility Flaring for drillsit®snutdown /startup Flare system tmstlnc~ Faulty shutdown pn Facility maintenance High ambl®nt temperatures, S/D on high vibration Other: 1801 S/D on bight temp, causing 1s3o to sro Stabilized facility process and operation Repaired equipment difficulties with Faoility maintenance completed Other: Did incident cause black smoke? Yms: ^ No: 0 (It Yes, continue with this section) Did incident present a potantEal threat to human health or safety? Yes: ^ No: {If Yes, report to FEC as soon as possible. If No, report to ADEC with 24 hours.) Black smoke emitted from source: _ (ranter tag number and description) Notified ApEC by Fax on, Data: Time: Report the folloWing informetfon to ADEC within 24 hours BY FAX (90~-269.7508): Date and lima of black Smoke event: From: To: Volume flared which generated Dldck smoke (if differAnt from above): MSCF BBLS Description of steps to minimize emissions: S9a Section B, above. Type of materials burned: Cass' NGLs: Other: General W®ather: Air Temperature: Wind Speed/Rirection:~ Noma and phone number of person making the report: Name Phorie No. Based on information and belief formed after reasonable inquiry, I certify that the statements and information in and attached to this document are true, accurate an o pip . Facility Supervisor ~ Date Z O l cc: EOC Supervisor, PR t3 (flare gas antl black smoke incidents) Field Environmental Compliance Coordinator6, PR8 ~ (Black Smoke incidents or11y) PBU/CaPMA Fis1d Managers, (Black smoke inoidents only) GPMA Operations Engineering Technical Aiae, (GPMA reports only - ATO a77) Kuparuk: Field Environmental Compliance Coordinators. NSK 69 (flare gas and black smoke incidents) Updated FEC 8/98 P: ~G reaps\E nvironmental\FOrms\ Spill^GSa Reporting FormeVnaster Nov-26-O1 05:47 From-PRB OPERATIONS 907-659-5061 T-179 P.03/03 F-303 FLARE GAS VENTING REPORT PHILLIPS ALASKA, INC, • PRUDHOE BAY/GPMA/KUPARIIK FACII.-ITY: t,PC PERMIT NO. ~ 9A73-AA02fi GAS DISPOSITION ~ Flora vent Pate of Occurrence: f ~/~3l2b01 ^ Tirte df OG~ r>4 renter 24:00 Minui (mm/dd/yy) (ChecK Selection) OO:Q4 From: - oG:sq To: 00:55 - 00:01 Total Volume Flared: ®.3 MSCF 613LS From: 01:10 To: 01:25 = ooa5 From: 70: _ Meter Np,; L3 FaGilit ^ Punned [] unplanned From; To; _ (Check Selection) From: To: _ From: To: _ Total Minutes Flared: = 00:18 (Lisburne Only -Gas flared was from [] up'~am Q aowrtstream (Cnocx one) (Includes Volume Bared wttloh generated' black smoke, of TEG Coniacror mater at %PC) if applicable) A. D®scrlptlon of Incident antl Cause' (ChecK as many as needed to fully describe the Incident) _ S/R T!C# for 7/C SD duo to High exhaust temperature Seel oil system difficulties EMEpGFnNGY SHUTDOWN X ~electrlcal /Instrumentation maltunctlon E=tectrical /Instrumentation malfunction ,,,_, at other facility Cr&G) Chas transit system overpressure X backing CPF/Flow Station out Excessive /insufficient Inlet gas rates Into facility E. Action Taken to Eliminate Cause and Prevent Recurrence; (Check and describe As appllcabl®) X Started !restarted T/C tr t 80t Compressor /train depressured Reduceq /increased inlet gas rates Completed flare testing Corrected F&I fluctuation / failure Corrected E&I fluctuatlonlfailura at other facility (T&D) Black Smoke process upset in section of facility Flaring for drillsilo shutdown /startup Flare system testln4 Fauhy shutdown on Facility maintenance High ambient temperatures. S/D on f1i9h vibration Other: 1801 S/D on hi ht tom monitor Stabilized faclliry process and operation Repaired equipment difficulties with Facility maintenance completed Other. Did incident cause bl2ok smoke? Yes: ^ No: 0 (I( Yos, continue with this section) Did incident present a potential threat to human health or safety? Yes: ^ No: ^ (If Yes, report to FEC as soon a& possible. t} No, report to ADEC wit1124 hours.) Blank smoke emitted from souroe: _ (enter tag number and description) Notified ADEC by Fax on. Date: Time: _, Report the following information to ADEC wlthfn 24 hours BY FA?t (907.289.7508): Date end time of black smoke event: From: 70: Volume flared whicYl generated black smoke (if different from above): MSCF BBLS Description of steps to minimize emissions: See Section B, above. Type of materials burnsd: Gas: NGLs: Other: General Weether: Air Temp®rature; Wind Speed/Direction: Name and pnona number of person making the report: Name Phone No. Based on information and belief formed after reasonable inquiry, I certify that tno statements and information in and attached to this document ors true, accurate an co pie Fatlllty Supervisor tote ~' ~ cc: EOC Supervisor, 6 (flare gas ana black smoke Incidents) Feld Environmental Compliance Coordinators, PRB 7 (Black Smoke incidents only) PBU/GPMA Field Managers, (Black smoke Incidents only) GPMA Operations f=nglnooring Technical Aide, (GPMA repoR6 only • ATO 477) i<uparuk: Field Environmental Compliance Coordinators, NSK 61 (flare gas and black smoke incidents) p:\a ro up s\Env i ro nm e n W l\Fa rcn a\ upaat®a: FEC 8188 6pill•Gae Reporting Forms\mastor ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION racurcy operator rieia~s~ nnontniYear or uisposmon LISBURNE PRODUCTION CENTER #1 BP EXPLORATION, ALASKA PRUDHOE BAY/PT MCINTYRE 12/2001 Disposition Volume MCF* 1. Sold 137,247 2. Reinjected 10,729,864 3. Flared or vented less than 1 hour. 950 4. Flared or vented greater than 1 hour Su lemental report required--See 20 AAC 25.235 166 5. Pilot and Purge 42,195 6. Used for lease operations Fuel Assist 945,546 11,461 7. Other Lift Gas, Off Field 327,063 TOTAL items 1 - 7 12,194,492 8. NGL gas equivalent produced 137,247 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: 0 Remarks: I hereby ce that t Signature: foregoing 's true and correct to the best of my knowledge. Title: ~~~-'T)4l[ Date: Form 10-422 (Revised 4/95) ndicate contribution of each pool to total. Pool Name I Code LISBURNE I 640144 NIAKUK 640148 W_BEACH I 640186 West Niakuk 640149 Percent 57.25% 2.70% 0.00% 0.63% Official;Use Ont --Flarin Authorization > 1 hr. 1. Safety /~~ MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ~ Commission I~ b~ Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ,., , 1~3~ ~Y BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-01 DATE TIME VOLUME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/1/2001 1310-1425 (intermittent) 0 FOR startup Unplanned FOR online 12/4/2002 0617-0618 1 P070-V came open slightly due to a tuning problem Unplanned P070-V closed and stayed closed 12/19/2002 1441-1452 73 Shutdown compressor 1800 due to electrical/instumentation malfuncl Unplanned Stabilized process and started compressor 1801 12/19/2002 0504-1211 0 Shutdown compressor 1830 due to process upset in oil section Unplanned Stabilized process and restarted compressor 12/27/2002 2308-2323 70 Shutdown compressor 1800 due to process upset in discharge side c Unplanned Stabilized process and restarted compressor 12/28/2002 1030-1047 (intermittent) 70 Shutdown compressor 1800 due to electrical/instumentation malfuncl Unplanned Stabilized process and started compressor 1801 Total Flare <- 1 Hour 214 12/22/2002 1054-1541 (intermittent) Total Flare > 1 Hour 0 Volume Flared 214 Shutdown compressor 1830 due to a leak on MI injection well P2-42 I Unplanned MI system piping pressure relieved and returned to Measured Safety Pilot 24,161 Continuous Assist 6,817 TOTAL FLARED 31,192 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-01 DATE TIME VOLUME (MSCF) PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/01/01 1310-1425 (intermittent) 104 FOR startup Unplanned FOR online 12/04/02 0617-0618 1 P070-V came open slightly due to a tuning problem Unplanned P070-V closed and stayed closed 12/19/02 1441-1452 45 Shutdown compressor 1800 due to electrical/instumentation malfunct Unplanned Stabilized process and started compressor 1801 12/19/02 0504-1211 461 Shutdown compressor 1830 due to process upset in oil section Unplanned Stabilized process and restarted compressor 12/27/02 2308-2323 54 Shutdown compressor 1800 due to process upset in discharge side c Unplanned Stabilized process and restarted compressor 12/28/02 1030-1047 (intermittent) 58 Shutdown compressor 1800 due to electrical/instumentation malfunct Unplanned Stabilized process and started compressor 1801 Total Flare <= 1 Hour 723 12/22/02 1054-1541 (intermittent) 166 Total Flare > 1 Hour 166 Volume Flared 889 Shutdown compressor 1830 due to a leak on MI injection well P2-42 I Unplanned MI system piping pressure relieved and returned to Measured Safety Pilot 16,629 Continuous Assist 4,311 TOTAL FLARED 21,829 BP EXPLORATION (ALASKA) CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-01 DATE TIME VOLUME (MSCF) PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/01/01 1310-1425 (intermittent) 0 FOR startup Unplanned FOR online 12/04/02 0617-0618 0 P070-V came open slightly due to a tuning problem Unplanned P070-V closed and stayed closed 12/19/02 1441-1452 0 Shutdown compressor 1800 due to electrical/instumentation mal Unplanned Stabilized process and started compressor 1801 12/19/02 0504-1211 0 Shutdown compressor 1830 due to process upset in oil section Unplanned Stabilized process and restarted compressor 12/27/02 2308-2323 0 Shutdown compressor 1800 due to process upset in discharge s Unplanned Stabilized process and restarted compressor 12/28/02 1030-1047 (intermittent) 0 Shutdown compressor 1800 due to electrical/instumentation mal Unplanned Stabilized process and started compressor 1801 Total Flare <= 1 Hour 0 12/22/02 1054-1541 (intermittent) 0 Shutdown compressor 1830 due to a leak on MI injection well Pf Unplanned MI system piping pressure relieved and returned to Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-01 DATE TIME VOLUME (MSCF) PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/01/01 1310-1425 (intermittent) 0 FOR startup Unplanned FOR online 12/04/02 0617-0618 0 P070-V came open slightly due to a tuning problem Unplanned P070-V closed and stayed closed 12/19/02 1441-1452 0 Shutdown compressor 1800 due to electrical/instumentation mal Unplanned Stabilized process and started compressor 1801 12/19/02 0504-1211 0 Shutdown compressor 1830 due to process upset in oil section Unplanned Stabilized process and restarted compressor 12/27/02 2308-2323 0 Shutdown compressor 1800 due to process upset in discharge s Unplanned Stabilized process and restarted compressor 12/28/02 1030-1047 (intermittent) 0 Shutdown compressor 1800 due to electrical/instumentation mal Unplanned Stabilized process and started compressor 1801 Total Flare <= 1 Hour 12/22/02 1054-1541 (intermittent) Total Flare > 1 Hour 0 Volume Flared 0 Shutdown compressor 1830 due to a leak on MI injection well P~ Unplanned MI system piping pressure relieved and returned to Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-01 DATE TIME VOLUME (Mscf) PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/01/01 1310-1425 (intermittent) 0 FOR startup Unplanned FOR online 12/04/02 0617-0618 0 P070-V came open slightly due to a tuning problem Unplanned P070-V closed and stayed closed 12/19/02 1441-1452 2 Shutdown compressor 1800 due to electrical/instumentation malfuncl Unplanned Stabilized process and started compressor 1801 12/19/02 0504-1211 0 Shutdown compressor 1830 due to process upset in oil section Unplanned Stabilized process and restarted compressor 12/27/02 2308-2323 4 Shutdown compressor 1800 due to process upset in discharge side c Unplanned Stabilized process and restarted compressor 12/28/02 1030-1047 (intermittent) 4 Shutdown compressor 1800 due to electrical/instumentation malfunct Unplanned Stabilized process and started compressor 1801 Total Flare <= 1 Hour 10 12/22/02 1054-1541 (intermittent) Total Flare > 1 Hour Volume Flared Measured Safety Pilot Continuous Assist 10 1,102 272 Shutdown compressor 1830 due to a leak on MI injection well P2-42 I Unplanned MI system piping pressure relieved and returned to TOTAL FLARED 1,384 BP EXPLORATION (ALASKA) CONSERVATION ORDER N0.219 PRUDHOE BAY, WESTERN NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Dec-01 DATE TIME VOLUME (Mscf) PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 12/01/01 1310-1425 (intermittent) 0 FOR startup Unplanned FOR online 12/04/02 0617-0618 0 P070-V came open slightly due to a tuning problem Unplanned P070-V closed and stayed closed 12/19/02 1441-1452 1 Shutdown compressor 1800 due to electrical/instumentation malfuncl Unplanned Stabilized process and started compressor 1801 12/19/02 0504-1211 0 Shutdown compressor 1830 due to process upset in oil section Unplanned Stabilized process and restarted compressor 12/27/02 2308-2323 1 Shutdown compressor 1800 due to process upset in discharge side c Unplanned Stabilized process and restarted compressor 12/28/02 1030-1047 (intermittent) 1 Shutdown compressor 1800 due to electrical/instumentation malfuncl Unplanned Stabilized process and started compressor 1801 Total Flare <- 1 Hour 12/22/02 1054-1541 (intermittent) 0 Shutdown compressor 1830 due to a leak on MI injection well P2-42 I Unplanned MI system piping pressure relieved and returned to Total Flare > 1 Hour Volume Flared 3 Measured Safety Pilot 303 Continuous Assist 61 TOTAL FLARED 367