FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration Alaska Inc, Milne Point Jan-Ol
Disposition
Volume MCF*
1. Sold Fuel 17,925
2. Reinjected 556,559
3. Flared or vented less than 1 hour 347
4. Flared or vented greater than 1 hour 681
(Supplemental report required-See 20 AAC 25.235)
5. Pilot and Purge 372
6, Used for lease operations Fuel 293,698
Assist 10,132
7, Other
TOTALitems 1-7 879,714
8. NGL gas equivalent produced .~.~
a ~
9. Purchased gas o ~,
m ~.y°
10. Transferred from: ^'
0 ~
o ri~
11. Transferred to:
Remarks:
I hereby certi that t foregoing is true and correct to the best of my knowledge.
Signature ~ Title -~I,h2`t~AC,r Date 2'~`~~C3
*Indicate contribution of each pool to total.
Pool Name ode Percent
KUPARUK 525100 87.2
SCH. BLUFF 5 14 12.8
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~ ~~ MCF
2. Lease MCF
3. Conserv, Purposes MCF
~{
Commiss o er Date
Note; All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F, Report due by the 20th of
the month folowing the month of disposition.
Authority 20 AAC 25,235,
~j
~~~/i~-
Form 10-422
Rev. 4/95
o2iosi2ool 11:39 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan 2001
Flare Name: Flare 1
n fanned Events less than ore ual to 1 hour
Start Time Duration
(hh:mm) =Volume (MSCF) _
Flare Assist Cause
Comment
O1/02/200114:29:i 00:16 28.7 1.0
O1/02/200114:SS:i 00:05 5.5 0.0
O1/10/200109:35:~ 00:10 32.5 7.4
01/10/200109:58:1 00:02 3.0 2.0
01/14/200108:42:1 00:03. 8.6 2.1
O1/14/200108:56:~ 00:04 9.3 5.9
01/14/200114:53:1 00:07 33.7 11.0
O1/14/200115:11:i 00:04 8.6 4.8
01/14/200115:18:1 00:12 54.4 21.8
01/14/200115:41:1 00:04 10.1 5.5
O1/14/200122:59:~ 00:01 0.2 0.0
01/14/200123:12:1 00:03 3.3 1.1
01/15/2001 00:1 L•~ 00:04 3.0 0.8
O1/16/200117:53:~ 00:07 6.0 2.2
01/16/200118:57:1 00:03 4.8 1.0
O1/16/200119:11a 00:04 8.2 4.6
O1/16/200119:25:~ 00:05 2.0 0.3
01/18/200116;OL•i 00:29 90.2 80.9
01/18/2001 16:41 a 00:04 9.0 10.0
O1/28/200107:53:~ 00:07 S.I 3.8
01/28/200108:04:1 00:11 10.6 11.2
01/28/200110:14:1 00:01 0.3 0.0
01/28/200110:27:1 00:03 2.0 1.3
O1/29/200112:14a 00:01 0.3 0.0
01/29/200112:28:1 00:02 0.7 0.0
O1/29/200116:06a 00:09 7.1 5.9
~~~~~~..
FEB 1 6 20Q1
~iaska Oil & Gas GGi1S. Ccmmissior
Anchora~~e
BP Exploration Page 1 of 2 Milne Point, Alaska
oziosi2ool 1t:39 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jan 2001
Flare Name: Flare 1
n lanned Events reater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
01/11/2001 14:53: 01:07 681.0 170.0 Shutdown of 08 Turbine Power Flare probe out of service, values
Generator manually entered, actual time of flare
event 12:25 - 14:47.
Flare Assist
Unplanned Events <=1 hour 347.4 184.5
Unplanned Events > 1 hour 681.0 170.0
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 10,149.1
TOTAL FLARED VOLUME 1,028.4 10,503.6 MSCF
~~~:;
~~~
DEB ~ 6 2001
Alaska Oii & Gas Cons. Commission
AncharagE
BP Exploration Page 2 of 2 Milne Point, Alaska
R~'t;~~~
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 12:25 - 2 hr 22 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
FEB 1 6 200 ]
Alaska Oil & Gas Cons. Commission
Anchorage
Date: O1/11/O1
Flare Volume: 681
Assist Gas Volume: 170
Event description
MPU experienced a shutdown of the 08 turbine power generator. This resulted in a load shedding
of various equipment.
Note•
The flare transmitter was out for annual maintenance at the time of this event. Data from a similar
flare event that occurred on 12/01/00 was used to assist with the volume calculation for the
O1/11/O1 event. Trends on all flare valves off the production vessels for the 12/01/00 & 1/11/Ol
were used to calculate the volume. All of these tools were then used to calculate the unknown rate
for O1/11/O1.
Action taken to stop flaring
The maintenance personnel were dispatched to the turbine to troubleshoot the equipment problem.
The following wells were shut-in to mitigate the flaring: K-2,5,6,13,17,30,37,38; C-4,5,7,9; B-
3,4,6,9,10,15,20,21,22. A connection to the vibration sensor (XE-0806) was found loose. RTV was
used to keep the connection from coming loose again. After turbine cooled down, it was restarted
and no abnormal vibration was detected. All compressors was started and the flare stopped.
Action taken to prevent reoccurrence
Vibration caused the connection to slowly back off until it lost connection. Use of the RTV should
keep this from reoccurring.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 011101 681 Revised 4-25-99 LEN
ALASKA OIL AND GAS CONSERVATION COMMISSION
~'
N
Sv
G' ~ /~
u~ ~ Irn
>~ ._.
;,: :~ ~
a rn
L
-, ~ c,~ .._,..
c~v u CV
c ca
o
~"T'y
Q
N
0
FACILITY REPORT Of PRODUCED GAS DISPOSITION
Facility Operator Field(s)
Milne Point BP Ex loration Alaska Inc. Milne Point
Disposition Volume MCF'
1. Sold Fuei 16,414
2. Refn~ected 448,091
3. Flared or vented less than 1 hour 217
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purpe 33fi
6. Used for lease operations Fuel
Assist 269,467
8 978
7.Other
TOTAlitems 1-7 743,503
8. NGL ~7as equivalent produced
9. Purchased gas
10. Transferred from:
11, Transferred to:
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
/,l.~tn.c_ ~~ rltle prod , ~4nalyst
Form 10-422
Rev. 4/95
Date ',~ 15 01
Feb-O1
of Disposition
'Indicate contribution of each pool to total.
Pool Name ode Percent
KUPARUK 525100 81.4
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~,.. ~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of disposition.
Authority 20 AAC 25.235,
001 14:35
Milne Point Unit
Monthly Gas Flaring Incident Report
For: Feb 2001
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
02/01/200102:10:+ 00:05 3.5 2.4
02/01/200102:23:+ 00:07 4.9 5.4
02101/200102:58:+ 00:02 0.9 0.3
02/01!200114:58:+ 00:02 1.5 0.9
02/03/2001 01:1 L•+ 00:04 1.6 0.7
02/03/200101:26:+ 00:04 1.5 0.9
02/03/200103:59:+ 00:01 0.5 0.0
02/03/200112:14:+ 00:01 0.4 0.0
02/03/200114:29:+ 00:01 0.2 0.0
02J03/200118:28:+ 00:02 0.4 0.0
02/03/200118:40:+ 00:05 2.1 1.3
02J03/200 i 18:54:+ 00:06 2.6 1.7
02/03/200119:14! 00:01 0.4 0.1
02/03/200120:56:+ 00:04 10.5 9.8
02!08!200121:27! 00:03 18.5 0.8
02116/200102:41:+ 00:04 8.5 0.0
02/18/200112:40:+ 00:35 56.8 52.0
02/181200113:20:+ 00:10 13.5 14.5
02/18/200113:4L•+ 00:04 1.8 1.3
02/19/200123:06:+ 00:09 40.4 i7.4
02/19/200123:27:+ 00:03 4.2 2.8
02/21/200103:43:+ 00:02 13.1 6.0
02/26P2001 14:21:+ 00:09 28.8 28.3
RECEIVED
~A~ 16 2001
Alaska Oil & Gas Cons. Commission
Anchorage
Flare Assist
Unplanned Events <=1 hour 216.7 146.5
Unplanned Events > 1 hour 0.0 0.0
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 9,166.9
TOTAL FLARED VOLUME 216.7 9,313.5 MSCF
BP Exploration Page 1 of 1 Milne Point, Alask
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Mar-Ol
Disposition
Volume MCF'
1, Sold Fuel 18,658
2. Reinjected 596,437
3. Flared or vented less than 1 hour 412
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 611
5. Pilot and Purge 372
6, Used for lease operations Fuel
Assist 308,060
10,612
7. Other
TOTAL items 1-7 935,162
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to;
Remarks:
I hereby certif that the regoing is true and correct to the best of my knowledge.
Signature Title V~c~2 TAr-X Date l
Form 10-422
Rev. 4/95
'Indicate contribution of each pool to total.
Pool Name ode Percent
KUPARUK 525100 79.9
H. BLUFF 5 514 .l
Official Use Only-FlaringAuthorization>1 hr.
1. Safety ~ ~~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
~~
"~~ l~ t7~.-t ~ ~~
Commis ner ~
~ / ~ 1 6 ~
Date
Note; Afl volumes must be corrected to
pressure of 14.65 psia and to a temperature.-
of 60 degrees F, Report due by the 20th of
the month folowing the month of disposition.
Authority 20 AAC 25,235,
~:
~j~o,t
oaio~aool 14:14 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Mar 2001
Flare Name: Flare 1
n tanned Events less than ore ual to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
03/14/200111:57:+ 00:03 1.2 0.6
03/14/200122:26:+ 00:04 2.7 1.7
03/15/200100:13:+ 00:02 0.2 0.0
03/15/200100:26:+ 00:04 1.5 0.4
03/15/200100:44:+ 00:01 0.5 0.0
03/15/200100:58:+ 00:02 0.5 0.0
03/15/200101:04:+ 00:11 4.2 0.0
03115/200101:26:+ 00:04 2.2 0.0
03/151200108:14:+ 00:01 0.5 0.0
03/16/200120:26:+ 00:04 34.5 13.9
03117/200102:13:+ 00:02 10.3 4.3
03/17/200105:26:+ 00:04 13.7 6.3
03/17/200109:10:+ 00:05 4.0 1.1
03/171200109:23:+ 00:07 5.9 3.2
03/17/200109:39:+ 00:06 22.8 9.3
03/171200115:43:+ 00:02 10.4 4.6
03/17/200116:31:+ 00:29 23.9 11.0
03/17/200117:12:+ 00:03 2.7 1.5
03/1 7/200 1 22:58:+ 00:02 11.0 11.2
03! 18/2001 03:12:+ 00:03 12.6 5.4
03/18/200108:44:+ 00:01 9.9 4.4
03/18/2001 i 5:22:+ 00:08 24.9 7.3
03118/200115:43:+ 00:02 2.5 23.7
03/24/200116:08:+ 00:07 6.3 5.1
03/241200116:19:+ 00:11 11.3 11.9
03/24/200117:27:+ 00:03 0.9 0.0
03124/200117:42:+ 00:03 1.2 1.2
03/25/200105:58:+ 00:02 8.3 1.2
03/25/20010b:03:+ 00:12 41.2 31.1
03/25/200106:26:+ 00:04 13.4 7.4
03/25/200106:31:+ 00:29 47.5 22.3
03/25/200107:14:+ 00:01 2.2 2.0
03/25/2001 15:14 ~ 00:01 0.6 0.1
03/25/200115:59:+ 00:01 0.6 0.0
03/251200116:13:+ 00:02 0.3 0.0
03!25/200116:28:+ 00:02 0.5 0.0
03/25!200116:44:+ 00:01 0.6 0.0
03/25/200116:59:+ 00:01 0.9 0.0
03/25/200117:14:+ 00:01 0.6 0.0
03/25/200117:27:~ 00:03 1.1 0.0
03/251200117:43:+ 00:02 0.5 0.0
Comment
BP Exploration Page 1 of 3 Milne Point, Alaska.
oaio~nool 14:14 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Mar 2001
Flare Name: Flare 1
n Tanned Events less than ore ual to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
03/25/200117:58: 00:02 0.9 0.0
03/31/200110:55: 00:05 21.8 9.1
03/31/200111:02: 00:13 48.3 23.9
BP Exploration Page 2 of 3 Milne Point, Alasks
oaio~i2oo~ ~a:ia Milne Point Unit
- Monthly Gas Flaring Incident Report
For: Mar 2001
Flare Name: Flare 1
(Unplanned Events greater than 1 hour ~
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
03/23/2001 07:04: 09:26 610.7 609.5 Gas compressors, C-5502, 5503, 5531 High GOR wells were shut-in to
A & B s/d for discharge valve repairs mitigate Hazing; repairs completed and
compressors returned to service.
Flare Assist
Unplanned Events <= 1 hour 411.9 225.2
Unplanned Events > 1 hour 610.7 609.5
Planned Events <=1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 10,149.1
TOTAL FLARED VOLUME 1,022.6 10,983.8 MSCF
BP Exploration Page 3 of 3 Milne Point, Alasks
BP Explowation
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 07:04 - 9 hr 26 min
Planned event: ®yes
^ no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Date: 03/23/01
Flare Volume: 611
Assist Gas Volume: 610
Event descriution
Milne Point shutdown (C-5502, 03, 31A/B) the low pressure & injection compressors for safety,
valve replacement.
Note:
Replaced two leaking common discharge valves with new double block & bleed valves & one
common shut down valve (XV-5529).
Action taken to stow flaring
All replacement parts, tools, crews, & procedures were in place before the compressors were shut
down. The C-3 & B-20 wells were shut in before we took the compressors down.
Action taken to arevent reoccurrence
No action could be taken to prevent a reoccurrence of this failure. Due to the safety of personal &
equipment this job had to take place.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 032301 1221 Revised 4-25-99 LEN
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Ex loration (Alaska) Inc. Milne Point Apr-O1
Disposition
Volume MCF*
1. Sold Fuel 16,908
2. Reinjected 567,724
3. Flared or vented less than 1 hour 384
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 549
5. Pilot and Purge 360
b. Used for lease operations Fuel
Assist 273,826
9, 895
7. Other
TOTAL items 1-7 869,646
8. NGL qas equivalent produced
9. Purchased qas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certify hat the f regoing is true and correct to the best of my knowledge.
Signature Title ~l/LCSYL`f'.4~k Date ~~~
'Indicate contribution of each pool to total.
Pool Name ode Percent
KUPARUK 525100 79.7
S H. BLU F 52514 1 .6
SAG RIVER 525150 1.
Official Use Only-Flaring Authorization>1 hr.
l .Safety ~ ; ~ C( MCF
2. Lease MCF
3. Conserv. Purposes MCF
L~ ~ +
Commissi er `~~~ D a--
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of disposition.
Authority 20 AAC 25.235.
a
~~~ 4
Form 10-422
Rev. 4/95
osiosizool 16:43 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Apr 2001
Flare Name: Flare 1
n lanned Events less than ore ual to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
04/02/200101:25:1 00:05 3.0 0.2
04/02/200101:42:1 00:03 1.3 0.3
04/02/200104:13:1 00:02 1.5 0.9
04/02/200104:29:1 00:01 0.4 0.0
04/09/200104:42:1 00:03 14.8 3.7
04/09/200108:43:1 00:02 19.9 4.9
04/10/200111:44:1 00:01 0.4 0.0
04/13/200116:12:1 00:03 2.4 0.5
04/18/200109:27:1 00:03 1.5 0.0
04/18/200109:42:1 00:03 0.9 0.0
04/20/200104:27:1 00:03 27.1 3.1
04/20/200104:44:1 00:01 8.7 8.7
04/20/200109:13:1 00:02 11.7 5.2
04/20/200109:29:1 00:01 0.7 0.3
04/20/2001 13:27:1 00:03 1 s.0 6.5
04/21/200106:58:1 00:02 17.5 6.2
04/22/200113:17:1 00:13 13.7 6.7
04/22/200113:36:1 00:10 11.4 5.3
04/22/200113:48:1 00:12 14.8 7.2
04/22/200122:14:1 00:01 0.2 0.0
04/22/200122:29:1 00:01 0.8 0.0
04/23/200101:43:1 00:17 92.1 44.2
04/23/200102:05:1 00:10 28.6 14.4
04/23/200102:18:1 00:12 29.2 15.2
04/23/200104:18:1 00:12 9.8 4.7
04/23/200104:39:1 00:06 4.6 1.9
04/23/200105:04:1 00:11 15.2 6.7
04/23/200105:23:1 00:07 7.4 2.8
04/23/200106:01:1 00:14 18.8 8.6
04/23/200106:39:1 00:06 4.2 1.4
04/23/200107:11:1 00:04 3.3 1.0
04/23/200107:59:1 00:01 1.8 0.3
04/23/200114:42:1 00:03 1.8 0.1
BP Exploration Page 1 of 2 Milne Point, Alaska
osiosi2ool 16:43 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Apr 2001
Flare Name: Flare 1
Unplanned Events greater than 1 hour ~
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
04/22/2001 10:37: 02:38 342.0 169.2 07 generator s/d on a governor flame High GOR wells were s/i to mitigate
alazm flaze/Maint could not locate cause of
false alazm/unit restazted/(see Haze rpt
07 s/d on 042201 for cause of alarm)
04/23/2001 02:38: 01:37 206.6 102.4 07 generator s/d due to wire elect. short High GOR wells were s/i to mitigate
on high temp alarm switch Haze; repair was made and unit returned
to service.
Flare Assist
Unplanned Events <=1 hour 384.5 161.2
Unplanned Events > 1 hour 548.6 271.6
Planned Events <= 1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 9,821.7
TOTAL FLARED VOLUME 933.1 10,254.5 MSCF
BP Exploration Page 2 of 2 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 10:37 - 2 hr 38 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 04/22/01
Flare Volume: 342
Assist Gas Volume: 169
There was an unplanned flaring event when the 07-generator shutdown on a loss of flame alarm
from the governor. The facility and field did a load shed of power from this shutdown. Maintenance
personnel were expedited to repair the problem and restart the turbine.
Action taken to stop flaring
The load shed shutdown gas compression and both water injection trains. High GOR wells that did
not go down on the load shed were shut in. One gas train at CFP stayed on line during this load
shed. The 07 turbine was restarted and all systems were brought back to their normal condition.
The flaring stopped.
Action taken to prevent reoccurrence
Maintenance will contact Woodward on this shutdown 04-23-01.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Cleve Pogue /Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 042201 1 Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 02:38 - 1 hr 37 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event descriution
Date: 04/23/01
Flare Volume: 207
Assist Gas Volume: 102
There was an unplanned flaring event when the 07-generator shutdown on high T54 temp. This time
both the Woodward Gov. and the PLC picked up the same alarm. We found a shorted wire in a 3/a"
capped L conduit fitting. The facility and field did a load shed of power from this shutdown.
Maintenance personnel were expedited to repair the problem and restart the turbine.
Action taken to stop flaring
The load shed shutdown gas compression and both water injection trains. High GOR wells that did
not go down on the load shed were shut in. One gas train at CFP stayed on line during this load
shed. The 07 turbine was restarted and all systems were brought back to their normal condition.
The flaring stopped.
Action taken to prevent reoccurrence
Propose Micro Net Governor training for our turbine maintenance team. Evaluate our governor
trouble shooting procedures and make changes as needed.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Cleve Pogue /Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 042301 Revised 4-25-99 LEN
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point May-Ol
Disposition
Volume MCF*
1. Sold Fuel 17,032
2. Reinjected 568,175
3. Flared or vented less than 1 hour 929
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 3,759
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 271,878
11, 335
7. Other
TOTAL items 1-7 873,480
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature ~~LL ~'iL/~P~. Title P('D~. 4lYSt~ Date G 1~ 2OO~
*Indicate contribution of each pool to total.
Pool Name ode Percent
KUPARUK 525100 80.5
H. BLUFF 514 .8
SAG RIVER 525150 2.7
Official Use Only-Fldring<Authorization>1 hr.
1. Safety ~ ~~ 5 ~~ MCF
2. Lease MCF
3. Conserv. Purposes MCF
,~
~~ ~ i ~~ ~ ~~
Commis o er
1 b ;a-
Date
Note; All volumes must be corrected to
pressure of 14.65 psia and to a temperature
of 60 degrees F. Report due by the 20th of
the month folowing the month of disposition.
Authority 20 AAC 25.235.
ak/ "
~~0'-
Form 10-422
Rev. 4/95
o~io7izool osaa Milne Point Unit
' Monthly Gas Flaring Incident Report
For: May 2001
Flare Name: Flare 1
n lanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
OS/O1/200109:17:~ 00:28 82.8 40.3
05/01/200109:46:1 00:14 47.2 23.9
OS/O1/200110:09a 00:06 28.6 14.1
05/01/200110:22:1 00:08 8.7 3.6
OS/O1/200110:41:i 00:04 6.4 3.3
OS/O1/200111:43:i 00:02 1.2 0.0
05/04/200111:31:1 00:14 14.0 11.5
OS/11/200109:40:~ 00:05 3.2 1.8
OS/17/200108:17:~ 00:28 53.7 41.8
OS/17/200108:48:~ 00:12 7.0 6.1
OS/22/200114:12:~ 00:03 3.6 0.7
OS/22/200114:29a 00:01 2.2 2.3
OS/22/200114:43:~ 00:02 0.8 0.0
OS/22/200115:59:~ 00:01 0.4 0.0
OS/22/200117:10:~ 00:05 2.8 1.6
05/22/200118:12:1 00:03 4.4 2.8
05/23/200107:28:1 00:02 1.3 0.4
OS/23/200107:58:~ 00:02 1.3 0.4
OS/23/200110:13:~ 00:02 0.9 0.0
05/23/200110:58:1 00:02 1.1 0.2
OS/23/200113:43:~ 00:02 0.4 0.0
05/23/200113:53:1 00:07 3.8 2.4
05/23/200114:01:1 00:14 8.8 9.1
05/23/200121:35:1 00:10 3.3 0.0
05/23/200122:06:1 00:09 15.8 0.0
05/23/200122:27:1 00:03 2.6 0.0
05/23/200122:33:1 00:12 13.5 0.0
05/23/200122:53:1 00:07 12.0 0.0
05/23/200123:44:1 00:01 0.2 0.0
05/23/200123:58:1 00:02 0.8 0.0
OS/24/200100:57a 00:03 0.9 0.0
05/24/200116:13:1 00:02 0.4 0.0
05/24/200116:25:1 00:05 1.6 0.0
05/24/200116:43:1 00:02 1.2 0.0
05/25/200112:38:1 00:07 8.1 3.5
05/30/200122:47:1 00:58 521.3 156.9
05/30/200123:52:1 00:08 63.1 13.4
BP Exploration Page 1 of 2 Milne Point, Alaska
on~o~izoo- 08:14 Milne Point Unit
Monthly Gas Flaring Incident Report
For: May 2001
Flare Name: Flare 1
n Tanned Events reater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
05/04/2001 10:08:r 01:22 332.4 275.4 PU-0801 turbine s/d due to erroneous High GOR wells were s/i to mitigate
emergency shutdown (ESD) signal flaze/Work order to replace faulty ESD
switches/08 turbine restazted
05/23/2001 18:32:r 02:58 3,426.2 818.7 Gas Compressor train s/d on high level High GOR wells s/i to mitigate
in suction scrubber due [o failed control Haze/control relays replaced/compressor
relays on high level liquid alarm train restazted
Flare Assist
Unplanned Events <= 1 hour 929.4 340.1
Unplanned Events > 1 hour 3,758.5 1,094.2
Planned Events <= 1 hour and
not exceeding 5,000 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 10,273.1
TOTAL FLARED VOLUME 4,688.0 11,704 MSCF
BP Exploration Page 2 of 2 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 how)
Location: Central Facilities Pad
Time and duration of incident(s): 18:32 2 Hrs 58 Min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 05/23/01
Flare Volume: 3426
Assist Gas Volume: 819
There was an unplanned flaring event when the gas compression plant shutdown due to a high
liquid level in a compressor suction scrubber. The shutdown was extended due to the failure of 2
control relays.
Action taken to stow flaring
All high GOR wells were shut-in to decrease the flare volume. The compressor suction scrubber
level was drained to the normal operating level. Maintenance Technicians were dispatched to
troubleshoot the cause of our inability to gain a clear start permissive for the gas compressors. The
Maintenance Technicians found and replaced 2 failed control relays which enabled the gas
compressors to be started. All Gas Compressors were restarted and the flaring stopped.
Action taken to prevent reoccurrence
A Maintenance Technician is investigating and correcting the problem of not receiving a high level
alarm for the affected suction scrubber, which would have alerted us to the rising liquid level.
Reported by:
Name: Richard Heames
Title: Facilities Operator
Supervisor
Name: Cleve Pogue /Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 052301 Revised 4-25-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 10:08 lhr 22min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 05/04/01
Flare Volume: 332
Assist Gas Volume: 275
There was an unplanned flaring event when the 08-generator shutdown on local ESD switch trip.
During routine maintenance ESD switch was bumped. The facility and field did a load shed of
power from this shutdown. Maintenance personnel were expedited to restart the turbine.
Action taken to stop flaring
The load shed partially shutdown gas compression and both water injection trains. One gas train at
CFP stayed on line during this load shed. The 08 turbine was restarted and all systems were brought
back to their normal condition. The flaring stopped.
Action taken to prevent reoccurrence
ESD trip switches inside turbine enclosure will be replaced with new style. Until new switches
arrive on site existing switches have temporary covers installed.
Reported by:
Name: Tom Peppel
Title: Facilities Operator
Supervisor
Name: Cleve Pogue /Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 050401 Revised 4-25-99 LEN
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Jun-Ol
Disposition
Volume MCF*
1. Sold Fuel 16,967
2. Reinjected 621,450
3. Flared or vented less than 1 hour 1,713
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 621
5. Pilot and Purge 360
6. Used for lease operations Fuel
Assist 274,794
10,815
7. Other
TOTAL items 1-7 926,720
8, NGL gas equivalent produced
9, Purchased gas
10. Transferred from;
11. Transferred to:
Remarks:
hereby certify that the fgregoing is true and correct to the best of my knowledge.
Title (AiLG 2 -r-~C Date
'Indicate contribution of each pool to total,
Pool Name Code Percent
KUPARUK 525100 75,6
S H,BLUF 5 514 2 ,6
SAG RIVER 525150
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~ -Zt MCF
2, Lease MCF
3. Conserv. Purposes MCF
~1rlsv~.~ ~ ` ~
Commissi er ~ ~'~(G I~'Y
Date
Note; All volumes must be corrected to
pressure of 14.65 psla and to a temperature
of 60 degrees F, Report due by the 20th of
the month folowing the month of disposition,
Authority 20 AAC 25,235,
3~'~~U~
Form 10-422
Rev. 4/95
o7ioai2ool 16:30 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jun 2001
Flare Name: Flare 1
n Tanned Events less than ore ual to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
06/O1/200104:40:~ 00:05 9.6 1.2
06/03/200115:18: 00:27 126.8 97.5
06/03/200115:53: 00:07 23.0 23.7
06/07/200120:42: 00:03 1.7 0.0
06/07/200120:54:1 00:06 4.1 0.0
06/07/200121:11:1 00:19 15.2 0.0
06/07/200121:39: 00:06 5.3 0.0
06/07/200121:53: 00:22 18.6 0.0
06/07/200122:18: 00:12 10.3 0.2
06/07/200122:36: 00:09 13.5 1.7
06/07/200122:58:r 00:02 1.1 0.0
06/07/200123:07: 00:08 6.8 0.3
06/07/200123:25: 00:05 3.2 0.0
06/07/200123:42:1 00:03 1.0 0.0
06/08/200100:39: 00:06 4.4 0.0
06/08/200101:27:1 00:03 1.8 0.0
06/08/200107:25:1 00:35 32.5 3.7
06/08/200108:03:1 00:27 26.3 7.1
06/08/200108:40:1 00:05 3.9 0.4
06/08/200108:55:1 00:05 3.9 1.1
06/08/200109:27:1 00:03 1.4 0.0
06/08/200109:39a 00:06 5.8 1.3
06/08/200110:04:1 00:11 8.3 5.6
06/08/200112:44:1 00:01 0.2 0.0
06/08/200116:44:1 00:31 26.6 7.8
06/09/200110:18:1 00:12 10.9 2.0
06/09/200110:44:1 00:01 0.5 0.1
06/10/200103:55: 00:05 8.6 1.3
06/10/200104:03: 00:12 12.7 3.7
06/10/200104:16: 00:29 39.8 11.4
06/10/200104:46: 00:14 12.7 3.4
06/10/200119:44:1 00:01 2.3 0.2
06/10/200119:46a 00:44 307.5 143.7
06/10/2001 20:31:1 00:59 172.0 121.0
06/10/200121:31:1 00:44 104.8 73.4
06/10/200122:17:1 00:13 20.9 14.5
06/10/200122:32:1 00:43 48.2 34.0
06/10/200123:23: 00:07 9.2 6.3
06/11/200104:08: 00:07 26.1 17.5
06/11/200104:41: 00:19 77.1 61.7
06/11/200105:01: 00:29 38.9 28.8
BP Exploration Page 1 of 3 Milne Point, Alaska
~voai2ool 16:30 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jun 2001
Flare Name: Flare 1
n fanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
06/11/200105:59: 00:01 0.3 0.0
06/11/200109:01: 00:14 6.1 2.4
06/11/200109:17: 00:43 13.8 0.0
06/11/200110:12: 00:03 1.2 0.0
06/11/200110:38:1 00:07 5.9 2.0
06/ 11 /2001 11:26:1 00:04 5.5 2.0
06/11/200114:41:1 00:04 7.8 2.6
06/11/200114:56: 00:04 6.9 4.1
06/ 11 /2001 17:44:1 00:01 0.6 0.0
06/13/200105:14: 00:01 0.2 0.0
06/13/200110:11: 00:04 2.2 0.4
06/13/200115:03: 00:27 220.5 108.1
06/13/200115:39: 00:06 22.4 12.5
06/17/200107:43: 00:02 1.8 0.1
06/17/200108:16: 00:29 13.6 5.0
06/17/200108:48: 00:12 3.9 0.0
06/17/200109:13: 00:02 0.6 0.0
06/17/200110:29:1 00:01 0.3 0.0
06/18/200120:44: 00:01 0.3 0.0
06/18/200120:54:1 00:06 4.7 1.5
06/20/200114:42:1 00:03 3.0 0.9
06/20/200114:59:1 00:01 0.4 0.0
06/20/200115:10:1 00:05 2.3 0.3
06/20/200115:29:1 00:01 0.5 0.0
06/20/200115:42:1 00:03 1.0 0.0
06/20/200115:55: 00:05 3.9 1.3
06/20/200116:41:1 00:04 3.3 0.7
06/20/200116:53:1 00:07 7.0 3.7
06/25/200109:13:1 00:02 0.8 0.0
06/27/200117:28: 00:02 1.9 1.1
06/27/200117:37: 00:08 21.9 21.6
06/27/200118:12a 00:03 1.5 0.9
06/27/200118:22:1 00:08 5.4 4.7
06/27/200118:31:1 00:14 91.4 72.9
06/29/200105:58:1 00:02 1.2 0.0
06/30/200112:58:1 00:02 0.7 0.0
06/30/200114:29: 00:01 0.3 0.0
Comment
BP Exploration Page 2 of 3 Milne Point, Alaska
o~roai2ool 16:30 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Jun 2001
Flare Name: Flare 1
nplanned Events greater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
06/11/2001 06:56:1 02:04 620.7 309.2 08 power turbine s/d due to false High GOR wells were s/i to mitigate
generator stop alarm flare/maint troubleshoot false
alarm restart unit
Flare Assist
Unplanned Events <= 1 hour
Unplanned Events > 1 hour
Planned Events <=1 hour and
not exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Unmetered Assist Gas
I TOTAL FLARED VOLUME
1,712.9 923.5
620.7 309.2
0.0 0.0
0.0 0.0
9,941.7
2,333.7 11,174.5 MSCF
BP Exploration Page 3 of 3 Milne Point, Ala
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 06:56 - 2 hr 04 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 06/11/01
Flare Volume: 621
Assist Gas Volume: 309
MPU experienced a shutdown of the 08 turbine power generator. This resulted in a load shedding
of various equipment.
Action taken to stop t7aring
Maintenance personnel were dispatched to troubleshoot the turbine shutdown. The following wells
were shut-in to mitigate the flaring: K-2,5,6,13,17,30,33,37,38; C-3,4,7,9,14,22,26; B-
3,4,10,16,20,21,22; E-6,14,24,30; F-38,50,78,80; G-4; H-5,8,12; J-1,3,8,9,19,23,24; L-3,6,7. The
turbine shutdown alarm was a Generator Failure Fast Stop. There are 3 different inputs that could
have caused this shutdown. After the turbine generator was completely checked it was restarted. No
abnormal conditions were detected. All compressors were started and the flare stopped.
Action taken to prevent reoccurrence
Traps were installed in the PLC to capture which inputs caused the shutdown if it happens again.
Reported by:
Name: David Colton
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 061101 621 Revised 4-25-99 LEN
ALASKA OIL AND GAS CONSERVATION COMMISSION
1. Sold Fuel 17,822
2. Reinjected 620,493
3. Flared or vented less than 1 hour 230
4. Flared or vented greater than 1 hour
(Supplemental report re Ired-Sea 20 AAC 25.235) 0
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 294,067
10 034
7.Other
TOTAL items 1-7 943,018
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
that the foregoing is true and correct to the best of my
Signature
Title /VM6l~, ~')C
Date ~!y'~Qt
Official Use Only-Flaring Authorization>1 hr,
1. Safety MCF
2. Lease ® MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: Ail volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees
F. Report due by the 20th of the month folowing
the month of disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
FACILITY REPORT OF PRODUCED GAS DISPOSITION
osio3rzooi ia:is Milne Point Unit
Monthly Gas Flaring Incident Report
' For: Ju12001
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
07/16200I 17:06: 00:09 45.9 30.7
07/162001 17:20: 00:10 27.2 28.8
07/16/200117:40: 00:05 6.0 5.6
07/17200111:26: 00:04 4.7 2.3
07/17200114:13: 00:02 1.1 0.0
07/17200115:58: 00:02 1.7 0.2
07/17200116:08: 00:07 36.3 17.7
07/17200117:28: 00:02 1.2 0.0
07/18200113:53: 00:07 35.1 16.9
0720/200115:21: 00:09 27.4 11.2
0724200116:29: 00:01 0.2 0.0
0724200118:14:1 00:01 0.2 0.0
0724200118:20: 00:10 20.2 9.6
0724200118:39: 00:06 13.6 6.2
0724200118:53: 00:07 9.4 4.0
Unplanned Events <= 1 hour
Unplanned Events > 1 hour _
Planned Events <= 1 hour and
not exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Unmetered Assist Gas
TOTAL FLARED VOLUME
Flare Assist
230.1 133.2
0.0 0.0
0.0 0.0
0.0 0.0
10,273:1
230.1 10,t}Ob,~ MSCF
BP Exploration Page 1 of I Milne Point,
.e
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Au -01
Disposition
Volume MCF'
1. Sold Fuel 17,590
2. Reinjected 657,666
3. Flared or vented less than 1 hour 259
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 5,611
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 276,364
11 256
7. Other
TOTAL items 1-7 969,118
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
that the foregoing is true and correct to the best of my knowledge.
Signature C~•~< ~ Title ~~2TPCk
Form 10-422
Rev. 4/95
Date
'Indicate contribution of each pool to total.
Pool Name o e Percent
KUPARUK 525100 76.3
SAG RIVER 525150
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~ ~~ j MCF
2. Lease MC
3. Conserv. Purposes MCF
~~ ~ ~~ ~~,
Commis i ner a
~lf~~o~
Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees
F. Report due by the 20th of the month folowing
the month of disposition. Authority 20 AAC
25.235.
h;>~.~ ~ 4 ~~Q1
~~
`1r~~
,o9ios~2oot ov:ss Milne Point Unit
Monthly Gas Flaring Incident Report
For: Aug 2001
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF)
Start Time (hh:mm) Flare Assist Cause
08/19/200114:43: 00:02 0.7 0.0
08/19/200115:27: 00:03 1.2 0.0
08/ 19/2001 19:3 5 : 00 :10 11.0 12.3
08/21/200111:33: 00:12 11.8 5.4
08/21/200113:37: 00:08 6.8 0.0
08/21 /2001 16:08: 00:07 12.1 3.7
08/21/2001 22:4 9: 00:11 8.2 1.1
08/21/2001 23:04: 00:11 37.1 7.2
08/22/200103:55: 00:05 7.9 0.9
08/22/200104:08: 00:07 4.9 0.0
08/22/200122:29: 00:01 0.0 0.0
08/22/200122:43: 00:02 1.2 0.0
08/22/200123:24: 00:06 7.9 0.8
08/22/200123:37: 00:08 10.5 2.0
08/22/200123:55: 00:05 3.1 0.1
08/23/200108:14: 00:01 0.4 0.0
08/23/200112:28: 00:02 1.3 0.0
08/23/200112:36: 00:09 5.8 0.6
08/23/200116:42: 00:18 14.0 2.2
08/23/200117:12: 00:03 2.9 0.8
08/24/200122:58: 00:02 0.5 0.0
0$/24/200123:10: 00:05 7.8 1.8
08/24/200123:28: 00:02 1.5 0.0
08/24/200123:40: 00:05 4.5 0.7
08/24/200123:57: 00:03 2.9 0.8
08/25!200100:10: 00:05 6.6 1.3
08/25/200103:11:. 00:04 2.4 0,0
08/25/200104:14: 00:16 0.4 0.0
08/25/200104:40: 00:05 7.3 1.6
08/25/200104:57: 00:03 2.1 0.0
08/25/200105:13: 00:02 1.6 0.4
08/25/200105:55: 00:05 5.7 1.0
08/28/200103:29: 00:01 0.5 0.0
08/30/200102:44: 00:01 0.7 0.0
08/30/200114:38: 00:07 6.1 0.8
08/30/200114:59: 00:01 1.6 0.7
08/31/2()0108:11: 00:04 4.5 0.7
08/31/200108:22: 00:08 19.6 5.5
08/31/200108:38: 00:22 33.5 8.7
Comment
BP Exploration Page 1 of 3 Milne Poart, Alaska
. 09/08/2001 09:53 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Aug 2001
Flare Name: Flare 1
nplanned Events greater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
08/19/2001 12:59: 01:31 680.2 1.0 Full field production s/d- both main All wells were s/i as per systems s/d
power turbines s/d caused by battery sequence allows-temporary maint
charger failure to PLC power supply repairs made to battery charger (new
charger has been ordered)/plant
restarted and wells~put on production
in an orderly manner to mitigate
flaring.
08/19/2001 15:43: 03:47 2,358.6 575.6 Full field production s/d- both main All wells were s/i as per systems s/d
power turbines s/d caused by battery sequence allows-temporary maint
charger failure to PLC power supply repairs made to battery charger (new
charger has been ordered)/ plant
restarted and wells put on production
in an orderly manner to mitigate
flaring.
08/21/2001 09:52: 01:38 429.4 45.8 Full field production s/d- both main All wells were s/i as per systems s/d
power turbines s/d caused by battery sequence allows-additional temporary
charger failure to PLC power supply maint repairs made to battery charger/
plant restarted and wells put on
production in an orderly manner to
mitigate flaring.
08/21/2001 11:46: 01:44 147.1 32.1 Full field production s/d- both main All wells were s/i as per systems s/d
power turbines s/d caused by battery sequence allows-additional temporary
charger failure to PLC power supply maint repairs made to battery charger/
plant restarted and wells put on
production in an orderly manner to
mitigate flaring.
BP Exploration Page 2 of 3 Milne Point, Alaska
. o9iosi2oot o9:s3 Milne Point Unit
Monthly Gas Flaring Incident Report
_ For: Aug 2001
Flare Name: Flare 1
nplanned Events greater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm} Flare Assist Cause Comment
08/21/2001 16:20: 06:25 1,995.8 639.4 Full field production s/d- both main All wells were s/i as per systems s/d
power turbines s/d caused by battery sequence allows-additional temporary
charger failure to PLC power supply maint repairs made to battery charger/
plant restarted and wells put on
production in an orderly manner to
mitigate flaring.
Flare Assist
Unplanned Events <=1 hour
258.7 61.2
Unplanned Events > 1 hour S,bl 1.1 1,293.8
Planned Events <=1 hour and
not exceeding 5,()00 MCF 0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas 10,1.73.1
TOTAL FLARED VOLUME 5,869.8 11,LZ$.1 MSCF
BP Exploration Page 3 of 3 Milne Point, Alaska
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 12:59 - 1 hr 31 min
15:43 - 3 hr 47 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 08/ 19/01
Flare Volume: 680
2359
Assist Gas Volume: 1
576
The battery charger in Mod 56 went into a high charge rate for the battery bank. Hydrogen gas was
detected and the ventilation system cleared the alarm. The charger was left at high charge rate. The
charger did not shut-off after charging the battery bank and caused the DC voltage to the PLC to be
increased. The PLC power supply shutdown due to the high DC voltage to protect it's self and
thereby shutting down both of our turbine electric power generators (07 and 08). This caused a total
field-wide shutdown at Milne Point.
Action taken to stop flaring
The initial shutdown depressurized the whole plant. The two power generators have a 2-hour
cooling period from the fast shutdown. We brought in cooling fans to help cool-down the turbines.
After the 2-hour period we brought gas in from our gas well for a restart. The assist gas was
increased to help with the flaring and black smoke. The gas lift compressor was started and we
started bringing back the wells. The IWAG was started and fluids brought back into the vessels for
normal operation.
Action taken to prevent reoccurrence
Maintenance was tasked with ordering a new battery charger for the Mod 56 battery room and a
replacing the other battery chargers around the plant and the field.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 081901 Revised 425-99 LEN
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 09:52 - 1 hr 38 min
11:46 - 1 hr 44 min
16:20- 6hr 25 min
Planned event: ^ yes
®no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 08/21 /01
Flare Volume: 429
147
1996
Assist Gas Volume: 46
32
639
At approx. 09:52 hours the battery charger in Mod 56 went to high charge rate and the DC voltage
increased to the point of shutting down the power supply for the PLC control. This caused both of
the 07 & 08 power turbine generators to shutdown. This created afield-wide or Level 3 shutdown at
Milne Point. The 07 turbine locked up because of the fast shutdown and has a 2 hr. waiting period.
We started 08 turbine but it shutdown a few minutes later because of the battery charger going to a
high DC voltage rate. We also were having problems with our control room computers locking up the
screen.
Action taken to stop flaring
The discussion was made to run a temporary power cable from the adjoining Mod. 57-battery
charger to the Mod 56 power box and thereby eliminating the defective charger in Mod 56. After
the temp. Connection (until a new charger arrives) the generators were brought back on line and we
started to bring up the field and the plant to normal operations. We had several minor start-up
problems with equipment and were back on line at approx. 20:00 hrs.
Action taken to prevent reoccurrence
Maintenance was tasked with ordering a new battery charger for the Mod 56 battery room and the
temporary hook-up to Mod. 57's battery charger should eliminate this reoccurrence.
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 082101 Revised 4-25-99 LEN
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration Alaska Inc. Milne Point Sep-01
Disposition
Volume MCF'
`Indicate contribution of each pool to total.
Pool Name o e Percent
KUPARUK 525100 73.4
SAG RIVER 525150
1. Sold Fuel 16,512
2. Reinjected 614,100
3. Flared or vented less than 1 hour 666
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 4,046
5. Pilot and Purge 360
6. Used for lease operations Fuel
Assist 267,805
10 847
7. Other
TOTAL items 1-7 914,336
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certi~that the fAregoing is true and correct to the best of my knowledge.
Signature a!,~, U_ l ~ Title fNi(,/L T~SC Date ( ~Z
Official Use Only-Flaring'Authorization>1 hr.
1. Safety . d 35 d ) , rQ~ MCF
'7
2. Lease MCF
3. Conserv. Purposes MCF
/I
~y t, r/ )~(3/GPI
Commissio r Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees
F. Report due by the 20th of the month folowing
the month of disposition. Authority 20 AAC
~~.~.. ~V
Form 10-422
Rev. 4/95
"?t:~ ~ ~ ~ 2001
~1~1~a (Iii ~ 1;;x;5 t;UrlS. t~0ltit~88j011
Q(~nr~~rr~QP
loiuizool l3:az Milne Point Unit
Monthly Gas Flaring Incident Report
For: Sep 2001
Flare Name: Flare 1
n tanned Events less than ore ual to 1 hour
Duration =Volume (MSCF)
Start Time (hh:mm) Fiare Assist Cause
Comment
09/03/200114:53: 00:07 7.2 1.5
09/03/200115:14: 00:01 0.5 0.0
09/03/200117:58: 00:02 1.3 0.0
09/06/200117:42: 00:03 5.9 0.6
09/06/2001 17:55: 00:05 12.1 4.2
09/06/2001 18:09: 00:06 10.5 1.7
09/06/200118:24: 00:06 13.7 4.8
091061200122:14: 00:01 0.3 0.0
09/06/200122:28: 00:02 2.0 0.0
09108/200122:46: 00:29 47.8 13.5
04!08/200123:18: 00:12 14.4 4.2
091081200123:38: 00:07 4.5 0.3
09/08/200123:57: 00:03 1.3 0.1
09/10/200117:42: 00:03 0.9 0.0
09/11!200100:31: 00:14 29.8 15.2
09/11/200100:53: 00:07 103.2 25.6
091111200101:26: 00:04 12.3 3.5
09/ 11/2001 03 :25: 00:05 12.6 1.9
09/13/200107:11: 00:04 3.1 0.2
09/13/200107:43: 00:02 0.8 0.0
09/131200107:52: 00:08 2.8 0.0
091131200108:08: 00:0? 2.7 0.0
09/13/200108:21: 00:09 4.9 1.6
09!13/200108:33: 00:12 6.1 2.0
09/13/2001 08:50: 00;10 4.0 0.5
09/13/200109:08: 00;07 2.8 0.5
09113/200109:24: 00:06 2.1 0.0
09/13/200109:39: 00:06. 2.2 0.0
091131200109:53: 00:07 2.2 0.0
09/13/200110:09: 00:06 2.1 0.0
09/13/200110:23: 00:07 2.1 0.0
09/13/200110:36: 00:09 4.7 1.6
09/13/200110:47: 00:13 6.2 2.0
09/131200111:01: 00:14 5.3 0.6
09/13/200111:17: 00:13 5.5 1.2
09/13/200111:34: 00:11 4.7 0.4
09/13/200111:58: 00:02 0.7 0.2
09/13/200112:11: 00:04 1.5 0.0
091131200112:20: 00:10 3.1 0.0
BP Exploration Page 1 of 5 Milne Point, Alaska
ionvzooi i3:zz Milne Point Unit
Monthly Gas Flaring Incident Report
For: Sep 2001
Flare Name: Flare 1
n tanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
09/131200112:42: 00:03 1.2 0.0
09113/200112:57: 00:03 1.4 0.0
09/13/200113:08: 00:07 2.7 0.0
09113/200113:20: 00:10 4.0 0.5
09/13/200113:36: 00:09 3.7 O.S
09/13/200113:54: 00:06 2.5 0.0
09/i3/200114:08: 00:07 2.5 0.0
09/13/200114:23: 00:07 2.5 0.1
09/13/200114:37: 00:08 3.2 0.0
09113!200114:46: 00:29 13.0 4.1
09/13/200115:16: 00:14 5.9 2.0
09/13/200115:32: 00:13 5.1 1.2
09/13/200115:53: 00:07 2.7 0.0
09113!200116:06: 00:09 3.2 0.0
091131200116:20: 00:10 3.4 0.0
09/13/200116:33: 00:12 5.8 1.9
09113/200116:59: 00:01 0.5 0.0
09114/200103:58: 00:02 0.7 0.0
09/14!200116:57: 00:03 1.4 0.0
09/1SJ2001 12:13: 00:02 0.8 0.0
09/16/200102:29: 00:01 0.3 0.0
09116/200108:13: 00:02 0.8 0.0
09/17/200106:14: 00:01 0.3 0.0
04/171200112:43: 00:02 0.9 0.0
09/17/200116:29: 00:01 0.4 0.0
091201200123:58: 00:02 0.6 0.0
09/21/200100:14: 00:01 0.2 0.0
09/211200104:44: 00:01 1.9 0.2
09/21/200104:59: OO:OI 0.7 0.5
09!21/200109:07: 00:08 2i.1 2.2
09/22/200102:55: 00:05 3.2 0.0
0912212001 D3:14: 00:01 2.4 0.0
09/22/200104:57: 00:03 3.2 0.0
09/22/200120:55: 00:05 3.3 0.0
09/221200121:27: 00:03 2.2 0.0
09123/200102:59: 00:01 1.9 0.0
09/23/200107:13: 00:02 2.b 0.0
09123/200109:59: 00:01 0.2 0.0
09/23/200110:11: 00:04 2.8 0.0
Comment
BP Exploration Page 2 of 5 Milne Point, Ataska
lonlisool l3:za Milne Point Unit
Monthly Gas Flaring Incident Report
For: Sep 2001
Flare Name; Flare 1
n lanned Events less than ore ual to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
09!23/200116:44: 00:01 0.3 0.0
09/23/200119:27: 00:03 1.2 0.0
09123/200114:43: 00:02 0.8 0.0
09!23/200121:29: 00:01 0.2 0.0
09/23/200122:42: 00:03 1.3 0.0
09/23/200123:11: 00:04 2.6 0.0
09/23/200123:26: 00:04 2.3 0.0
09123/200123:44: 00:01 0.2 0.0
09/26/200103:29: 00:01 0.3 0.0
09/26/200103:35: 00:10 10.6 0.0
09126/200103:57: 00:03 2.1 0.0
09/261200104:56: 00:04 2.3 0.0
091261200105:14: 00:01 0.7 0.0
09126/200106:40: 00:05 2.8 0.0
09/261200106:55: 00:05 2.7 0.0
09/26/200107:44: 00:01 0.0 0.0
09/26/200107:Sb: 00:04 4.6 0.0
09/26/200108:26: 00:04 2.9 0.0
09/26/200108:38: 00:07 5.3 0.0
09/26/200109:57: 00:03 1.6 0.0
09126/200111:26: 00:04 2.8 0.0
09/26/200111:44: 00:01 0.7 0.0
09126/200112:12: 00:03 2.8 0.8
09/26/200112:26: 00:04 3.2 1.1
09126/200112:41: 00:04 4.1 1.4
09!26/200113:13: 00:02 1.0 0.0
09/26/200113:43: 00:02 1.7 0.1
09!26/2001 16:14: 00:01 0.1 0.0
09/26/200116:26: .00:04 4.7 1.7
091261200117:41: 00:04 3.9 1.2
09/26/200118:14: 00:01 0.3 0.0
09/26/200119:11: 00:04 3.2 0.9
09/26/200120:57: 00:03 1.4 0.0
09/26/200121:41: 00:04 4.1 1.4
09126/200121:59: 00:01 0.7 0.0
09/26/200122:12: 00:03 2.5 0.6
09/271200100:57: 00:03 2.1 0.4
09/27/200101:14: 00:01 0.3 0.0
09/27/200101:29: 00:01 0.5 0.0
Comment
BP Ez~loration Page 3 of 5 Mitne Point, Alaska
lonv2ool ls:z2 Milne Point Unit
Monthly Gas Flaring Incident Report
' For: Sep 2001
Flare Name: Flare 1
n Tanned Events less than ore ual to 1 hour
Duration =Volume (MSCF}
Start Time (hh:mm) Flare Assist Cause Comment
09!27/200105:12: 00:03 0.8 0.0
09!27/200105:29: 00:01 0.7 0,0
09/27/2001 06:14: 00:01 0,1 0.0
09/27!200106:25: 00:05 2.8 0.7
09/27/200106:41: 00:04 3.9 1.4
09127/200106:55: 00:05 3.6 1.1
09!27/200108:12: 00:03 2,6 0.6
09/27!200108:44: 00:01 0.2 0.0
09/27/200108:57: 00:03 3.5 1.2
09/28/200100:33: 00:42 72.7 35.6
09/28/200103:04: 00:11 10.6 5.7
09!28/200103:18: 00:12 5.3 1.4
09/28/200103:38: 00:0? 3.3 1.5
09/28!200105:28: 00:02 0.4 0.0
09!28/200105:43: 00:02 0.7 0.0
09128!200118:13: 00:02 0.6 0.0
09!28/200122:58: 00:02 0.3 0.0
09/28/200123:58: 00:02 0.6 0.0
09129/200100:13: 00:02 0.7 0.0
09!29/200100:29: 00:01 0.5 0.0
09/29/200100:43: 00:02 0.8 0.0
09!29/200105:44: 00:01 0.2 0,0
09/30/200116:29: 00:01 0.3 0.0
09!30/2001 22:29: 00:01 0.1 0.0
09130/200122:43: 00:02 0.8 0.0
BP Exploration Page 4 of 5 Milne Point, Alaska
toil v2oot 13:22 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Sep 2001
Flare Name: Flare 1
Unplanned Events greater than 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
09/10/2001 18:46: 05:44 2,222.7 944.0 08 turbine s/d due to a Compressor High GOR wells were s/i to mitigate
intake air temperature sensor failure flaring/Temperature sensor repairs
made/unit back on line
09/21/2001 06:42: 02:18 1,645.8 72.6 During scheduled field slowdown, pm's High GOR wells were s/i to mitigate
were performed on offline turbine(08). flaring. 07 turbine was returned to
During the PM process, relay on service.
online unit (07) was pulled causing a
field level IIIs/d.
09/28/200101:18: 01:42 177.9 87.9 Total Gas compression plant s/d (part High GOR wells were s/i to mitigate
of gas plant was isolated for flaring. Lube oil system valve repair
Maintenance).S/D due to a faulty made. Unit restarted.
manual valve in compressor Tube oil
system.
Unplanned Events <=1 hour
Unplanned Events > 1 hour
Planned Events <=1 hour and
not exceeding 5,000 MCF
Flare Assist
665.9 160.1
4,046.5 1,104.5
0.0 0.0
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas
9941. 7
TOTAL FLARED VOLUME 4,712.4 I I ~ 20~ ~ 3 MSCF
BP Exploration Page 5 of 5 Milne Point, Alaska
AL?EC Notification Form
Fax this form to: (907} 269-7508 Telephone: (907} 269-8888
BP Exploration IAlaskai. Inc.
Company Name
Milne Point Production Facility
Facility Name
1. Reason for notification: ~l Excess Emission
Deviation
2. Event Information {Use 24-hour clock):
START Time: ENO Time
Date: 09!1012001 18:46 19:44
3. Cause of Event {Check all that apply):
^ START UP ~ UPSET CONDITION
~ SHUT DOWN ^ SCHEDULED MAINTENANGE
^ Permit Gondiition
Duration (hrmin):
00:58
Total: 00:58
^ CONTROL EQUIPMENT
^ OTHER
Attach a detailed description of what happened, including the parameters or operating conditions
exceeded.
The Compressor Intake air Temperature (CIT) sensor (TE-08100) failed at approximately 18:46
on 09110/2001. This caused a fast stop of the turbine causing aload-shed condition. The rotor
on the gas producer locked for approximately 2.5 to 3 hours. The cause of the CIT failure was
coking build up on the probe. Unplanned flaring began at approximately 18:46 as a result of the
sensor failure and continued for approximately 5 hr 44 min. Intermittent black smoke was emitted
from the CFP flare for the first 58 minutes of the flaring event.
4. Sources Involved:
Identify each Emission Source involved in the event, using the same identification number and
name as in the Pemait. List any Control Device or Monitoring System affected by the event.
Attach additional sheets as necessary.
Source ID No. Source Name Description
No ID CFP Flare Flare located at MPU CFP
Control Device
NJA
5. emission Limit Exceeded and/or Permit Condition Deviation:
Identify each Emission Standard and Permit Condition potentially exceeded during the event.
Attach a list of ALL known or suspected injuries or health impacts. Attach additional sheets as
necessary.
Permit Condition Limit Exceedance
#5/50.05 Opacity >20% for more than 3 minutes in 1 hr Intermittent 00:58
There are no known or suspected injuries or health impacts associated with this event.
6. Emission/Deviation Reduction:
Attach a description of the measures taken to minimize and/or control emissions or permit
conditian deviations during the event.
Production was minimized and wells were shut in to reduce flaring. Black smoke stopped after
the CC5501A compressor was restarted.
7. Corrective .Actions:
Attach a description of corrective actions taken to restore the system to normal operation and to
minimize or eliminate chances of a recun'ence.
A decade box was installed to simulate the CIT until one could be ordered and installed.
Installation is scheduled for the Sept. 2001 slow down for both the PU0701 and PU0801 turbines.
Additional Information:
Total Gas Flared 2222.7 mscf
Assist Gas flared 9A4. mscf
This report will be certified as part of the next Milne Point Production facility operating report.
A copy of this report will be faxed to (907) 269-7508.
Report generated by:
Koreen Burrow
ACTT Environmental Advisor
Phone: 907-670-3382
ADEC Notification Form
Fax this form to: (907) 269-7508 Telephone: (907) 269-8888
BP Exploration (Alaskal. Inc.
Company Name
Milne Point Production Facility
Facility Name
1. Reason for notification: I~Excess Emissign ^Permit Condition
Deviation
2. Event Information (Use 24-hour clock):
START Time: END Time: Duration (hr:min):
Date: 09/21/2001 06:42 09:15 1:47
Total: 13:12
3. Cause of Event (Check all that apply}:
^ START UP ®UPSET CONDITION ^ CONTROL EQUIPMENT
® SHUT DOWN ^ SCHEDULED MAINTENANCE ^ OTHER
Attach a detailed description of what happened, including the parameters or operating conditions
exceeded.
The plant and field had been ramped down for the scheduled slowdown and repair work. At
approx. 06:42 they were preparing tt) do the fire and gas preventative maintanCe work and were
pulling relays in the fire and gas cabinet. A relay was pulled which caused a level 3 shutdown of
the fuel gas system. This caused the running turbine (07) to switch to liquid fuel (diesel) and the
kilowatt level was greater than the allowable amount. It was in emission excursion for approx. 1
hr. 47 minutes. The level. 3 shutdown also caused the on line gas compression machine to
shutdown. This caused an intermittent black smoke event and also a greater than 1 hour flaring
event before the machines were brought back on line at approx. 08:37 for the gas lift compressor
(Big A) and 09:13 for the gas injection compressor (Little 6). The flaring stopped at approx.
09:15 hours. There was intermittent black smoke on and off from 06:42 for 2hr because the
assist gas was off from the fuel gas shutdown.
4. Sources Involved:
identify each Emission Source involved in the event, using the same identification number and
name as in the Permif. List any Gontro/ Device or Monitoring System affected by the event.
Attach additional sheets as necessary.
Source ID No. Source Name Description Control Device
PU 0701 Turbine 0701 Electric Power Generator 07 N/A
No ID CFP Flare Flare located at MPU CFP N/A
5. Emission Limit Exceeded andlor Permit Condition Deviation:
Identify each Emission Standard and Permit Condition potentially exceeded during the event.
Attach a list of ALL known or suspected injuries or health impacts. Attach additiona/ sheets as
necessary.
Permit Condition Limit Exeeedance
#5/50.05 Opacity >20% for more than 3 minutes in 1 hr Intermittent
23. lAii Operate < 7771 KW when using fuel oil I hr and 47 minutes
There are no known or suspected injuries or health impacts associated with this event.
6. EmissionlDeviation Reduction:
Attach a description of the measures taken to minimize and/or control emissions or permit
condition deviations during the event.
Production was cut back and the Emergency generators were started.
7. Corrective Actions:
Attach a description of corrective actions taken to restore the system to normal operation and to
minimize or eliminate chances of a recurrence.
The IWAG compressor was brought back up following the Little Bstart-up.
Technicians are to review the Shutdown PM procedure.
Additional Information:
Total Gas flared 1645.8 mscf
Assist gas flared 72.6 mscf
This report will be certified as part of the next Milne Point Production Facility operating report.
A copy of this report will be faxed to (907) 269-7508.
Eceedance on permit condition 5 is a potential exceedance since the observance was not done in
accordance with method 9.
Report generated by:
Vic Farris
ACT! Environmental Advisor
Phone: 907-670-3382
BP E~oration
Milne Point Unrt
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 01:18 - 1 hr 42 min
Planned event: ~ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 09/28/00
Flare Volume: 177.9
Assist Gas Volume: 87.9
MPU experienced an unplanned gas compressor shutdown. The cause was a faulty manual valve
between the oil filters. We had half of second and third stage gas compression shut down for
maintenance work. Support crews were called out to locate the cause and make repairs.
Action taken to stop flaring
Immediate response to the compressor shut down by maintenance crew. Wells B3, B9, B i 0, B 15,
B20, B21, B22, C5, C7, & C9 were shut in to mitigate flaring. The compressor was checked & put
back in service. Flaring was eliminated shortly after the compressor returned to service.
Action taken to prevent reoccurrence
Maintenance personnel will pull valve to check for faults and make recommendations on a path
forward. They will research the need for a new valve and replace if needed. This should help prevent it
from happening again.
Reported by: Supervisor
Name: David Coston Name: Cleve Pogue
Title: Facilities Lead Technician Title: Facilities Supervisor
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Ex loration (Alaska) Inc. Milne Point Oct-01
Disposition
Volume MCF'
1. Sold Fuel 17,194
2. Reinjected 641,291
3. Flared or vented less than 1 hour 644
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 3,510
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 276,853
10 493
7. Other
TOTAL items 1-7 950,357
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
Remarks:
hereby certify that the foregoing is true and correct to the best of my
Gf//1.Yll J/~~i.~..rn Title ~0(• ~"Gc.i ~ Date (~
'Indicate contribution of each pool to total.
Pool Name o e Percent
KUPARUK 525100 73.3
SAG RIVER 525150
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~ ~,~,~®~ MCF
2. Lease ~~ ~ MCF
v
onserv. Purposes
3. C MCF
..
Commissi r ~ Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees
F. Report due by the 20th of the month folowing
the month of disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
11/09/01 FRI 15:57 FAX 9073457762 SHIPLEY'S 1~j002
11!09/2001 15:13 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Oct 2001
~`lare Name: Flare 1
a laIImed Evems less than or equal to 1 hour ..-.J
Duration - =Volumc (MSCF)
Start Time (hh-~) Flute Assist Cause
LO/O1/~ 00109;58: 00:02 0.5 0.0
10/01/200111:14: 00:01 0.3 0.0
10/02/::001 17:51: OO:U9 6.9 2.4
10/02/;'00118:25: 00:05 3.3 0.9
10/02/:'.00118:43: 00:02 1.5 0.3
10/03/:!001OO:S9: 00:01 0.2 0.0
10/03/:!00110:Z8: 00:02 1,0 0.0
10/03/:!OOIl0:A4: 00:01 1.0 0.3
10/03/:?00110:56: 00:04 3.2 0.9
10/03/:200113:09: 00:06 4.5 1.6
10/03/:?001 13:28: 00:02 0.5 0.0
10/03/:100113:44: 00:01 0.2 0.0
10/03/:100116:43. 00:02 0.4 0.0
10/03/.20011$:14: 40:01 0.4 0.0
10/03/.00119:1.4: OO:UI 0.2 0.0
10/03/200119:28: 00:02 0.8 0.0
10104/200100:43: 00:02 0.9 0.0
10/04/200100:59: 00:01 0.3 0.0
10/04/too101:4]: 00:04 1.0 0.0
10/04/200101:58: 00:02 0.7 0.0
10/05/200108:14: 00:01 0.3 O.U
10/05/200108:57: 00:03 1.7 0.0
10/05/200109:29: W:O1 0.4 0.0
lU/U5I200109:56: 00:04 3.7 1.2
10/05/200113:29: 00:01 0.4 0.0
]0/05!200113:43: 00;02 1.8 0.5
10/05/200123:39: 00:06 3.1 0.6
1,0/06200102:27: 00:03 1.4 0.0
10/061200102:43: 00;02 1.0 0.0
10/061200102:50: 00:10 5.9 2.3
10/061200103:13: 00:02 2.0 0.2
10/O6, 2001 03:23: 00:07 3.5 1.4
10/06,'200103:54: 00:06 3.0 0.1
10/06,'200104:03: 00:12 4.6 1.3
10106,'200I04:29: 00:01 0.6 0.4
10/06'2001 06: i 3: 00:02 1.1 0.0
10/06,'2001 06:59: 00:01 0.3 0.0
loio~ f2oo 1 16:13: 00:02 1.1 0.0
10/06.200117:29: 00:0] o.a o.o
Coioament
$p E7c~lorahon page 1 of 7 Milne Point, Alaska
11/09/01 FRI 15:57 FAX 9073457762 SHIPLEY`S C~j003
11/fl912001 15:13 ~ihle POAIt Utlit
Monthly Gss Flaring Incident Report
For: Oct 2U01
Flare Name: Flare 1
n lan~ned Events less than or equal to 1 hour
Duration =Volume (M5CI~ =
Start Time (~~) Blare AASist Cause
10/06/1;00117:33: 40:27 10.3 0.4
10/06/:00118:11: 00:04 1.5 0.0
10/06/200118:24: 00:06 2.3 0.0
10/06/::OOI 18:35: 00:10 4.1 2.2
10/06/::00122:14: 00:01 0,4 6.7
10/07/;',00100:42: (x.03 I.4 6.7
10/07/:>.00105:57: 00:03 2.5 0.2
10107/:'.OOlOG;07: 00:08 2.8 0.0
10/07/:!0010$:23: 00:07 3.6 1.3
10/07/a001 10:08: 00:07 7.6 4.2
10/071:?00110:27: ao:03 2.0 0.3
10/07/:?00110:56: Oa:04 2.0 0.2
10/07/ 1001 11:44: OO:O i U.4 0.0
10/07/:200119:16: 00:14 26.3 12.0
10/07/:t00i 19:40: 00:05 3.0 1.4
10/07/200120:19: aO:ll 22,6 9.2
10/07/:2001 21:47: 00;13 11.5 6.2
10/08ROOI00:13: 00:02 1.S 0.0
10/08/00100:28: 00:02 0.7 0.0
10/08/2001 00:38: 00:07 3.0 0_ i
10/08/200100:58: 00:02 0.7 0.0
10108/200101:14: 00:01 0.6 0.0
10/08/200101:28: 00:02 i.0 0.0
10/OSI204101:43: 00:02 0.6 0.0
10/US/200101:56: 00:04 1.6 0.0
10/08/200102:44: 00:01 0.2 0.0
1 o/os/2a01 03:44: 00:01 0.3 0.0
loro8/2oo105:13: oo:oz o.a o.o
10/08/200105:43: 00:02 0.6 0,0
lp/08/200105:59: 00;01 0.4 0.0
10/48/200106:05: 00:10 4.G 0.2
loros~20o106.29: oo:ol o.s o_o
10/08!200107:05: 00:10 4.1 U.7
10/O8~'200I07;29: 00:0'1 0.4 0.0
10/O8~'200I 07:42: 00:03 1.4 0.0
10/0&'200107:Sh: 00:01 0.4 0.0
10/08,'200108:23: 00:47 2.2 0.0
10/08,'2001, 08.44: 00:01 0.4 O.U
10/08!'2001, 08:57: 00:03 0.8 0.0
Cou~ment
BP Exploration P~~ 2 of7 Milne Point, Alaeka
1,1/09/01 FRI 15:58 FAX 907x457762 SHIPLEY'S ~ 004
a va9iao(n ~s:is Milne Point Unit
Monthly Gas Flaring lncident Report
For: Oct 2001
Flare Name: Flare 1
n laTmed Events less thorn or equal to X I-yur ~ -
'Duration =Volume (MSC>~
Start Time (~l-=~) Flare Assist Cauxe Comment
10/OS/~:00109:04; 00:11 5.2 1.3
10/08/:!00109:23: 00:07 4.0 1.G
1o/a8/.!00109:43: oo:U2 0.7 0.0
10/081:!00109:53: 00:07 2.6 0.1
10/08/:'_00110:40: 00:05 I.5 0.0
10/O8/:?00110:58: 00;02 0.7 0.0
10/08/;1001 11;10: 00:05 1.9 0.0
10/08/'?OO11I:22: 00;08 3i.5 12.9
10/08/:100111:36: 00:09 45.8 23_G
10/08/'00111:55: 00:05 1.8 0.0
10/08/'?00112:12: 00:03 1.2 0.0
10/08/:?00112:26: 00;Q4 I.3 0.0
10/08/;200112:42: 00:03 4.3 1.8
10/08/;200112:59: 00:01 0.3 OA
10/08/:200113:14: OU:OI 0.3 0.0
10/08/.200113:27; 00:03 2.U 0.2
10/o81.z00113:40: ao:05 1.6 0.3
10/08/200113:58: 00:02 0.7 O.I
10/O8/Z00114:11: 00:04 1.7 U_0
10/08/200114:27: 00:03 1.3 0.0
10/08/200114:37: 00:08 3.3 2.2
!0/08/200115:27: 00;03 1.0 O.U
10/08/200115:38: 00:07 2.3 1.0
10/OS/200115:57: 00:03 1.2 0.8
1.0/08/2001 16:11: 00:04 1.1 0.3
10/08!200116:28: 00:02 0.5 0.0
10/08/200116:40: 00:05 i.9 1_I
10/asi200116:56: 00:04 1.5 0.8
10/08!200117:09: 00:06 2.3 1.4
10/08/200117:23: 00:07 2.4 1.5
10/08/200117:42: 00:03 0.6 0.0
l0/o8i 2001 17:58: 00: U2 1.1 0.4
10/0 8i 2001 18 :12 . 00:03 1.1 0.4
10/08/200118:26: 00:04 1.3 0.4
10/OSi2001 18:43: 00:02 Q.9 0.3
1Q/08/200118;58: 00:02 0.5 0.0
10/08/200119:12: 00:03 0.8 0.0
to/osr'2ooI19:29: Oo;al 0.4 0.3
10/08'200119:57: 00:03 1.0 0.3
BP Expfrnation Page 3 af7 Mil~7e Poim, Alaska
11/09/01 FRI. 15:58 FAX 907x457762 SHIPLEY'S C~7j005
~ ~io9noa~ 15:13 Milne ~vint Unit
Monthly Gas Flaring Incident Report
For: Oct 2001
Flare Name: Flare 1
n lanmed Events less than or equal to X hour
Duration -Volume (M5C1N~ =
Start Time (hh:mm) Flare Assist Canse Commeiat
l0/08/~:OOi 20:14: 00:01 02 0.0
l0/OS/~!40124:2G: Da:04 1.6 0.6
10/OS/<!00120;55: 00:05 1.0 0.0
10/08/00121:48: 00:07 I5.0 14.1
10/08/:!0012128: 00:02 0.7 0.0
10/08/:!00121:42: 00:03 0.9 0.0
10/08/:?00121:54: 00:06 4.1 3.0
10/OS/'?00122:11: 00:04 13 0.5
10/08/200122:28: 00:02 0.6 0.3
10/OS/'?00122:58: 00:02 03 0.0
10/08/:?001 23:13: 00:02 1.1 0.3
10/08!:20012327: 00:03 1.2 O.G
10/OS/:200123:43: 00:02 0.9 0.0
10/08/.200123:52: 00:08 2.9 2.3
10/09/.200100:13: UU:02 0.5 0.2
10/09/200100:41: 00;04 i.2 0.3
10/09/200100:58: 00:02 0.9 0,2
10/09/200101:11: 00:04 1.S 0.8
10109!200101:29: 00:01 O.G 0.5
10/09/200101:44: 00:01 0.6 0.0
10/091200101:55: 00:05 1.5 0.3
10/09/200102:10: oo:os 1.8 l.o
10/09/2001 02:27: 00:03 2. i 1.4
10/09200103:10: 00:05 i.S 0.5
10/091200103:24: 00:06 2.1 1.1
10/091200103:40: OO:OS 2,0 1.4
10/091'200103:55: OO;OS 2.2 1.0
10/09200104:US: 04:07 2.3 1.7
10/0912001.04:27: 00:03 1.6 0.8
lU/09i200104:40: 00:05 2.2 1.0
10/09'200105:20: 00:10 4.8 4.0
10/09.'200105:35: 00:10 5.0 4.5
10/09.`200105:59; OU:Ol 0.4 0.0
10/09,'200106:1.4: 00:01 0.6 0.0
10/09,'2001 oG:2o: oo:io 3.s 3.2
10/09'200106:37: 00:08 3.1 2.1
10/09,'200106:51: 00:09 4.5 4.4
10/09'200107:29: 00:01 0.4 0.0
10/09 ~200I 07:42: 00:03 1.0 0.0
BP ~xplornliaon
4 of 7 Ms'lne Poirg, Alaska
Px~
11/09/01 FRI 15:58 F1~X 9073457762 SHIPLEY'S [x]006
S U09/20(~t 1s:13 Milne Point Unit
Monthly Gss Flaring Incident Report
For: Oct 2001
Flare Name: Flare 1
Un lan~ned Eveats less than oar equal to 1 hoar
Duration =Volume (MSC
Stain Time (hh:mm) Flare .Assist Cause Comment
10/09/:00107;56: 00:04 i.4 03
10/09/.00108:07: 00:08 3.2 2.0
LO/09/f:00105:24: 00:06 2.8 1.4
10/09/f 001 US_35: 00:10 4.7 4.0
10/09/f 00108:46: 00' i4 5.4 5.3
10/09/::00109:01: 00:14 5.4 5.4
10/09/:'.OOi 09:26: 00:04 1.5 1.0
10/09/:>,00109:41: 00:04 I.3 0.3
10/09/;'.00109:57: 00:03 1.2 0.3
10/09%100110:03: 00:12 6.0 5.6
i0/U9% >_001 10:27: 00:03 1.3 0.8
10/09/:100110:38: 00:07 3.2 2.8
10/09/:100110:57: 00:03 0.9 0.3
10/09/200111:13: 00:02 0.6 0.0
10/09/:100 l l i:22: 00:08 2.5 1.6
10/09/;zoo 1 11:40: 00:05 1.7 1.9
10/09/;200111:46: 00:14 5.6 4.7
10/09/.200112:05: 00:10 4.6 4.4
10/09/200112:26: 00:04 1.4 0.5
10/09/200112:38: 00:07 2.2 1.0
10/09/200112:55: 00:05 2.0 1.5
1.0/09/200113:06; 00:09 3.6 2.7
10/a9/2U0113:26: 00:19 8.7 7.4
10/09/20Ui 13:51: 00'09 4.7 4.9
10/091200114:14: OU:Ul 0.6 U.U
10/091200114:25: 00:05 i.8 U_7
10/091200114:33: 00:12 5.U 4.6
LO/09i204114:Si: 00:24 9.4 8.4
10/49/200115:i8: p0:12 5.2 5.4
lU/09i200115:35: 00:10 4.0 3.5
10/09/200115:55: UU:US 1.8 1.3
10/09'200116:36: 00:09 3.U 1.8
10/09,'200116:58: OO:U2 0.7 0.5
10/09'200118:26: 00:04 1.5 0.8
10/13.2001 05:0 i : 00:14 43.1 0.0
10/13~200105:2i: 00:09 5.0 0.0
10/16,'200101:23: 00:07 8.7 8.1
10/16,200102:44: 00:01 0.9 0.1
1OI16.~200102:55: OO:US 5.3 5.3
BP Exp'.oiation Page S of 7 Milnc Pouf. AE~cka
11/09/01 FRI 15:.58 FAX 9073457762 SHIPLEY'S ~ 007
~ t /09/2061 15:13 Milme point Unit
Monthly Gas Flaring Incident Report
For: Oct 2Q01
Flare Name: Flare 1
Un la:n:ned Events less then ox eq ual to 1. hour ~ ~.~
Duration --Volume (MSCT')
Start Time (iih:mm) Hare .A,ssist Csase Comment
10/19/::00108:12: 00:03 1.4 0.$
10/19/:.00108:22: 00:08 2.3 1_U
l0/19/~.041 08:37: 00:08 3.1 2.6
10/19% !UUl O8;S2: 00:08 2.9 2.2
10/19/:!001, 09:03: 00:12 3.6 3.1
IO/19/7.001 09:20: OO::iO 3.7 3, i
to/19r~oo109:39: 00:06 z.0 0.9
10/ t 9/:100109:58: 00:02 1.1 1.3
10/19/;00118:08: 00:07 14.7 3.2
IO/19/:L0o118:26: 00:04 5.5 0.4
l0/20/:1oo10s:2s: 00:02 I.1 0.0
10/20/:200108:40: 00:05 1.3 0.0
10/30/:ZU0109:24: 00:06 16.6 2.5
10/30%Z00109:42; OU:03 1.9 0.4
DP Exp3 oration - Page 6 of 7 lvfilste PoitrS Alaalrn
11/09/01 FRI 15:58 FAX 9073457762 SHIPLEY'S 0 008
ttrosr~oct ~s:t3 Milne Poi Uait
Monthly Cxas Flaring Ltcident Report
For: Oct 2001
Flare Name: Flare 1
nplanned Events greater than i hour
Daration =~+'dume (MSCF~ =
Sta~^t Tune (h~~) pYare Assist Caase Comment
10/07/200108:17: 01:43 173.6 85.8 Plant sales oil output was reduced to High GOR welts were shut in to '
minimum for TAPS pipeline slowdown mitigate flaring. Plain was restarted
for 36 hours. after TAPS pipeline returned to lU0°/u
rdpacitY-
10/07/Z001 20:32: Oi: l3 107.4 54.0 Plant sales oil output was reduced to High tiOR wells were shut in to
mininurcn for TAPS pipeline slowdown mitigate flaring. Plant was restarted
for 36 hours. after TAPS pipeline retutxied to 100%
capacity.
10/13/"x:00101:51: 03:09 1,1I 1.5 0.6 Tmfiirtc 07 Shutdown due to faulty liigb~ Gor wells were shutin to mitigate
diesel fiyel RTD with flaring. Faulty RTD Wass replaced and
TAll11-0720alarm. plant put on full production
10/19/".001 16:12: 01:48 2,117.4 157.8 Gas lift compressor shBtdown. due to High GOR wells were shut into
faulty RTA wiring on compressor, mitigate flaring. Faulty wiring was
replaced and gas compressor put on
production.
Flare Assist
Unplsmted Events ~ 1 hour 644.1 293.5
Unplanned Events > i hart
Planned Events r 1 houu' and
not exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF 0.0 0.0
Unmetered Assist Gas
TOTAL FLA1tED VOLUME
3,509.9 298.2
0.0 0.0
Io~273.1
4,154.0 ~O,~Gk ~$ 1VISC~'
~~ ~~~~ ~~
1111.5 } o•!o
338 .3
BP Explxation
~~- ~ lo~r~~o~
1 ~ 3. Co ~- 85.8 - Lf2p-. $
+- 5~.(7
I o't. ~
l~lil~ Past, AlAClri
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 08:17 1 Hrs 43 Min
Time and duration of incident(s): 20:32 1 Hrs 13 Min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
necessary for facility operations.
® necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Date: 10/07/01
Flare Volume: 174
Assist Gas Volume: 86
Flare Volume: 107
Assist Gas Volume: 54
Event description
There were two unplanned flaring events when the field was ramped up after pipeline slowdown.
Action taken to stop flaring
The flare was then mitigated after enough wells were opened so gas compression could be restarted.
Action taken to prevent reoccurrence
No further action has been taken at this time.
Reported by:
Name: David Coston
Title: Facilities Lead Technician
Supervisor
Name: Jeff Scarbrough
Title: Facilities Supervisor
Flare incident report 100701 Revised 4-25-99 LEN
ADEC Notification Form
Fax this form to: (907) 269-7508 Telephone: (907) 269-8888
BP Exploration (Alaska), Inc.
Company Name
Milne Point Production Facility
Facility Name
t. Reason for notification: IExcess Emission ^Permit Condition Deviation
2. Event Information (Use 24-hour clock):
START Time: END Time: Duration (hr:min):
Date: 10/13/2001 01:51 05:15 03:24
Total: 03:24
3. Cause of Event (Check all that apply):
^ START UP I UPSET CONDITION ^ CONTROL EQUIPMENT
I SHUT DOWN ^ SCHEDULED MAINTENANCE ^ OTHER
Attach a detailed description of what happened, including the parameters or operating conditions
exceeded.
At approx. 01:51 hours the 07 turbine generator shutdown on UA-07135 (PU0701 Turbine External Trip Input) and
load- shed the plant and field. The panel view on the turbine showed that the diesel fuel gas temperature (TAHH-
0720) had caused the 07 turbine to trip.
4. Sources Involved:
Identify each Emission Source involved in the event, using the same identification number and
name as in the Permit. List any Control Device or Monitoring System affected by the event.
Attach additional sheets as necessary.
Source ID No. Source Name Description Control Device
PU 0701 Turbine 0701 Electric Power Generator 07 N/A
5. Emission Limit Exceeded and/or Permit Condition Deviation:
Identify each Emission Standard and Permit Condition potentially exceeded during the event.
Attach a list of ALL known or suspected injuries or health impacts. Attach additional sheets as
necessary.
Permit Condition Limit Exceedance
#5/50.05 Opacity >20% for more than 3 minutes in 1 hr Intermittent 3h:24m
There are no known or suspected injuries or health impacts associated with this event.
6. Emission/Deviation Reduction:
Attach a description of the measures taken to minimize and/or control emissions or permit
condition deviations during the event.
The gas injection wells were shut-in to help mitigate the flaring.
7. Corrective Actions:
Attach a description of corrective actions taken to restore the system to normal operation and to
minimize or eliminate chances of a recurrence.
Maintenance was called out and replaced the suspect RTD for the temperature indicator. The 07
turbine was brought back on line and flaring ceased at approx. 05:15 hours. The plant and field
were brought back on line.
Additional Information:
Unplanned flare volume > one hour
1112. mscf flare volume
1.0 mscf assist gas
This report will be certified as part of the next Milne Point Production Facility facility operating report.
A version of the black smoke reporting portion of this document has been faxed to (907) 269-7508
Report generated by:
Vic Farris
ACT! Environmental Advisor
Phone: 907-670-3382
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 16:12 - 1 hr 48 min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
® necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Date: 10/19/01
Flare Volume: 2117
Assist Gas Volume: 158
Event description
B Gas lift compressor shut down due to frayed wire rub on RTD temperature transmitter on cylinder
#3 water jacket. The A gas lift compressor also shut down due to high pressure spike to suction.
Action taken to stop flaring
Shut in gas lift wells at B and C pads and restart compressors.
Action taken to prevent reoccurrence
Maintenance replaced faulty cable and associated unions.
Reported by: Supervisor
Name: Tom Peppel Name: Cleve Pogue
Title: Facilities Operator Title: Facilities Supervisor
Flare incident report 101901 Revised 4-25-99 LEN
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Ex loration (Alaska Inc. Milne Point Nov-01
Disposition
Volume MCF'
1. Sold Fuel 17,566
2. Reinjected 718,008
3. Flared or vented less than 1 hour 538
4. Flared or vented greater than 1 hour 0
(Supplemental report requin;d--See 20 AAC 25.235)
5. Pilot and Purge 360
6. Used for lease operations Fuel 275,037
Assist 9 832
7. Other
TOTAL items 1-7 ax
~
1,021,341
__ A,
8. NGL gas equivalent produced ~ ~'
~"
~-`'°
9. Purchased gas ~..,
,a° ._ .~*
10. Transferred from:
~.
11. Transferred to: = ;~
I hereby cer ' that th foregoing is t ue and correct to the best of my knowledge.
Signature Title IM.6 2 TKSc Date (Z ~
"Indicate contribution of each pool to total.
Pool Name o e Percent
KUPARUK 525100 70.3
SAG RIVER 525150
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees
F. Report due by the 20th of the month folowing
the month of disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
~aitoizooi i3:os Milne Point Unit
Monthly Gas Flaring Incident Report
For: Nov 2001
Flare Name: Flare 1
n fanned Events less than ore ual to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
11/01/200118:59:1 00:01 0.4 0.0
11/02/200110:SS:i 00:05 3.3 0.0
11/03/200117:27: 00:03 1.3 0.0
11/08/200111:28: 00:02 1.4 0.0
11/08/200111:43: 00:02 1.1 0.0
11/09/200106:37:1 00:08 6.4 0.0
11/09/200106:59: 00:01 0.6 0.0
11/09/200121:11: 00:04 9.7 2.7
11/09/200121:23:1 00:07 13.8 6.4
11/09/200121:38a 00:07 7.9 4.6
11/19/200115:36:1 00:09 7.2 2.7
11/19/200115:59a 00:01 0.8 0.6
11 /22/2001 17:04:1 00:11 30.8 14.8
11/22/200117:24:1 00:06 5.2 2.2
11/22/200119:SSa 00:05 5.9 2.3
11/22/200120:09a 00:36 58.2 27.9
11/22/200120:54: 00:21 41.3 20.4
11/22/200121:19a 00:11 15.6 7.3
11/22/200121:33:1 00:12 14.8 7.7
11 /22/2001 21:52:1 00:08 15.1 7.0
11/22/200122:01:1 00:14 30.9 14.5
11/22/200122:18:1 00:12 33.5 17.4
11/22/200122:31:1 00:14 12.7 5.5
11/22/200122:52:1 00:08 14.4 6.5
11/22/200123:03: 00:12 14.6 7.0
11/22/200123:25:1 00:50 81.6 39.6
11/23/200100:18: 00:12 13.5 6.7
11/23/200100:42:1 00:03 2.2 0.9
11/23/200100:47: 00:13 16.9 7.5
11/23/200101:01:1 00:29 51.2 25.8
11/23/200101:43:1 00:02 4.0 2.5
11/26/200122:53:1 00:07 12.5 5.6
BP Exploration Page 1 of 2 Milne Point, Alaska
a2norzool 13:os Milne Point Unit
Monthly Gas Flaring Incident Report
For: Nov 2001
Flare Name: Flare 1
n Tanned Events less than ore ual to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause Comment
11/26/200123:07: 00:08 8.8 3.8
Unplanned Events <=1 hour
Unplanned Events > 1 hour
Planned Events <=1 hour and
not exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Unmetered Assist Gas
TOTAL FLARED VOLUME
Flare Assist
537.6 249.8
0.0 0.0
0.0 0.0
0.0 0.0
9 941.7 ~
537.6 ~ 0 ~ q 1. y MSCF
BP Exploration Page 2 of 2 Milne Point, Alaska
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska Inc. Milne Point Dec-01 REV 1
Disposition
Volume MCF*
1. Sold Fuel 18,714
2. Reinjected 672,811
3. Flared or vented less than 1 hour 1,925
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 3,092
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 290,252
11 899
7. Other
TOTAL items 1-7 999,065
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from: PBU CGF (NGLS) 215,506
11. Transferred to:
Remarks
I hereby certi that th foregoing is true and correct to the best of my knowledge.
Signature ~ Title yl/b C~ (~. 71~X Date l V c y
*Indicate contribution of each pool to total.
Pool Name o e Percent
KUPARUK 525100 72.5
SAG RIVER 525150 3.5
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure
of 14.65 psia and to a temperature of 60 degrees
F. Report due by the 20th of the month folowing
the month of disposition. Authority 20 AAC
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Milne Point BP Exploration (Alaska) Inc. Milne Point Dec-01
Disposition
Volume MCF'
1. Sold Fuel 18,714
2. Reinjected 888,317
3. Flared or vented less than 1 hour 1,925
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 3,092
5. Pilot and Purge 372
6. Used for lease operations Fuel
Assist 290,252
11 899
7. Other
TOTAL items 1-7 1,214,571
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to:
the~bregoing is trues and correct to the best of my knowledge.
nature 6~_~..f~• (~j~'~fX.lA. Title /'VI~C~~-T7~.A Date
"Indicate contribution of each pool to total.
Pool Name o e Percent
KUPARUK 525100 72.7
SAG RIVER 525150 3.5
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~j MCF
/ Z
2. Lease MCF
3. Conserv. Purposes MCF
Commissione 1~ o
Date
Note: All volumes must be corrected to pressure
of 14.65 Asia and to a temperature of 60 degrees
F. Report due by the 20th of the month folowing
the month of disposition. Authority 20 AAC
25.235.
r` ~~~
Form 10-422
Rev. 4/95
,91/04/2002 13:14 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Dec 2001
Flare Name: Flare 1
n Tanned Events rester than 1 hour
Duration =Volume (MSCF) =
Start Time (hh:mm) Flare Assist Cause Comment
12/02/200113:OO:i 04:30 885.1 641.5
12/02/200121:47: 02:13 214.5 160.1
12/07/200102:01: 01:14 288.2 1.0
12/07/200107:37: 07:53 1,704.3 237.2
Flare Assist
Unplanned Events <= 1 hour
Unplanned Events > 1 hour
Planned Events <=1 hour and
not exceeding 5,000 MCF
Planned Events > 1 hour or
exceeding 5,000 MCF
Unmetered Assist Gas
TOTAL FLARED VOLUME
1,925.2 958.0
3,092.2 1,039.8
0.0 0.0
0.0 0.0
10273, I
5,017.4 12270 ,q MSCF
BP Exploration Page 5 of 5 Milne Point, Alaska
.~
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Central Facilities Pad
Time and duration of incident(s): 13:00 - 4 hr 30 min
21:47 - 2hr13min
Planned event: ^ yes
® no
This flaring or venting incident was: (check one)
^ necessary for facility operations.
® necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 12/02/01
Flare Volume: 885
215
Assist Gas Volume: 642
160
Due to some tie-in work needing to be done for KEOR , IWAG I was S/D. After the tie-in was
complete, IWAG 1 was restarted, it developed a leak on the main cooling water pump due to a seal
failure and had to be shutdown for maintenance.
Action taken to stop flaring
The following wells were shut-in to help mitigate the flaring:
B15,B9,B4,B21,B22,C3,C4,CS,C9,C14,C26,C41,C22,E25,E30,F33,L3. maintenance personnel
were dispatched to repair the seal failure on the cooling water pump.
Action taken to prevent reoccurrence
Reported by:
Name: Jerry Gronos
Title: Facilities Lead Technician
Flare incident report 120201
Supervisor
Name: Cleve Pogue
Title: Facilities Supervisor
Revised 4-25-99 LEN
r
BP Exploration
Milne Point Unit
Flaring Incident Report
(exceeding 1 hour)
Location: Milne Point CFP Flare
Time and duration of incident(s): 02:01 01:14
07:37 07:53
Planned event: ^ yes
X no
This flaring or venting incident was: (check one)
X necessary for facility operations.
^ necessary for facility upgrades.
^ necessary for facility testing procedures.
^ an emergency that threatened life or property.
^ necessary to prevent loss of ultimate recovery.
Event description
Date: 12/07/2001
Flare Volume: 288
1704
Assist Gas Volume: 1
237
At approx. 01:41 hours, a total field-wide shutdown was caused by a level switch low /low reading
on tank T-5711 the Cooling Medium Expansion Tank. The low level alarm that would normally alert
to a shutdown level in the tank failed to trip. The low level and subsequent shutdown caused a
Level 4 Shutdown. The 0701 and 0801 turbine generators shutdown on a fast shutdown, which
requires a 2-hour, waiting period prior to re-start. Several additional time-delay problems occurred
due to the initial shutdown. Around 07:30 problems were encountered with the Little B injection
compressor and the alternate injection compressor was down for maintenance. There were
problems getting the IWAG running because of the lack of heat at C-pad from the extended initial
shutdown, facilitated by extremely cold ambient temperatures. It was suspected that black smoke
was emitted intermittently due to periodic short-term flaring during the shutdown and subsequent
start up periods.
Action taken to stop flaring
Production was shut in during facility shut down and gas lift wells were shut in to minimize flaring.
Production was minimized during start up to minimize flaring as well.
Action taken to prevent reoccurrenceThe LSLL (low level alarm system) was checked for correct
operation and no problems were found. A Management of Change process will be initiated to install
a level transmitter on the tank so that personnel can observe tank levels prior to the alarm switch
tripping. Further review of the shutdown logic will also be conducted in an attempt to determine
nature of failure.
Name: Name:
Jerry Gronos Cleve Pogue
Title: Title:
.Fac Lead Tech Fac Supv
Flare incident report 120701
Revised 4-25-99 LEN
.oiio4izoo2 13:14 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Dec 2001
Flare Name: Flare 1
n lanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
12/02/200117:33: 00:12 38.0 29.3
12/02/200117:52:1 00:08 10.5 7.6
12/02/200118:21: 00:09 38.7 20.1
12/02/200118:34: 00:11 24.0 19.5
12/02/200119:48: 00:12 40.1 21.5
12/02/200120:07: 00:08 23.9 17.0
12/02/2001 20:22:1 00:08 17.4 14.2
12/02/200120:37: 00:08 22.9 16.7
12/02/200120:53: 00:07 11.5 7.4
12/02/200121:06: 00:09 22.7 17.3
12/02/200121:18:1 00:27 42.2 31.0
12/03/2001 00:01 a 00:14 21.0 16.0
12/03/200100:18: 00:27 50.4 37.0
12/03/200100:46: 00:59 85.0 63.9
12/03/200101:50: 00:10 24.2 17.7
12/03 /2 001 02:04:1 00:11 19.7 10.8
12/03/200102:19a 00:11 20.7 18.3
12/03/200102:33:1 00:12 23.3 16.9
12/03/200102:48:1 00:12 23.1 17.4
12/03/200103:05: 00:25 43.8 33.0
12/03/200103:35: 00:10 24.8 18.7
12/03/200103:47: 00:13 21.4 15.3
12/03/2001 04:02:1 00:13 18.1 14.0
12/03/200104:18: 00:12 23.4 17.2
12/03/200104:33: 00:12 20.1 14.8
12/03/2001 04:47:1 00:13 18.4 13.3
12/03/200105:04: 00:11 21.8 16.4
12/03/200105:16:1 00:14 21.0 15.1
12/03/200105:32a 00:13 15.3 11.8
12/03/200105:52:1 00:08 21.6 15.8
12/03/2001 06:04:1 00:11 20.1 13.9
12/03/200106:22:~ 00:08 17.4 13.0
12/03/200106:35: 00:10 18.6 13.9
12/03/200106:49: 00:11 17.2 12.4
12/03/200107:04: 00:11 23.5 16.2
12/03/200107:16: 00:14 17.6 13.8
12/03/200107:34a 00:11 13.8 9.6
12/03 /2001 07:4 8:1 00:12 15.4 11.2
12/03/200108:01: 00:14 18.2 14.0
12/03/200108:17: 00:13 16.6 11.9
12/031200108:35: 00:10 13.7 9.6
BP Exploration Page 1 of 5 Milne Point, Alaska
Dlioai2ooz 13:14 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Dec 2001
f
Flare Name: Flare 1
n Tanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
Comment
12/03 /2 001 08:5 0:1 00:10 16.0 11.6
12/03/200109:27:1 00:03 6.7 4.4
12/03/200112:07:1 00:08 35.1 15.4
12/03/200114:24:1 00:21 91.9 70.2
12/03/200114:58:1 00:02 3.1 3.8
12/03/2001 17:59:1 00:01 0.1 0.0
12/03/200118:02:1 00:28 55.8 53.9
12/03/2001 18:35:1 00:10 18.7 19.3
12/03/200120:42:1 00:03 2.0 1.4
12/04/200100:43:1 00:02 1.6 0.9
12/04/200101:27:1 00:03 1.4 0.8
12/04/200103:14:1 00:01 0.3 0.0
12/07/200103:29:1 00:01 0.4 0.0
12/07/200106:14:1 00:31 23.0 0.0
12/07/200106:46:1 00:14 17.0 0.0
12/07/200107:13:1 00:02 4.8 0.0
12/07/200115:39:1 00:06 12.6 0.7
12/07/200115:52:1 00:23 61.5 4.5
12/07/2001 16:24:1 00:06 15.1 0.8
12/07/2001 16:5 5 :1 00:05 17.1 1.0
12/07/200117:10:1 00:05 15.0 0.9
12/07/200118:44:1 00:01 0.0 0.0
12/07/200119:12:1 00:03 0.9 0.0
12/07/2001 21:44:1 00:01 0.1 0.0
12/08/200122:14:1 00:01 0.4 0.0
12/09/200109:59:1 00:01 0.4 0.0
12/10/200102:59:1 00:01 0.4 0.0
12/10/200109:56:1 00:04 1.4 0.0
12/ 10/2001 11:07:1 00:3 8 146.0 19.4
12/ 10/2001 11:49:1 00:11 37.8 12.3
12/10/200112:09:1 00:06 10.8 2.6
12/10/200113:56:1 00:49 28.9 3.7
12/10/200114:55:1 00:05 1.7 0.0
12/12/200117:14:1 00:01 0.6 0.0
12/14/200107:59:1 00:01 0.7 0.0
12/14/200108:44:1 00:01 0.3 0.0
12/14/200110:43:1 00:02 0.3 0.0
12/14/200110:54:1 00:06 8.8 0.0
12/ 14/2001 12:44:1 00:01 0.1 0.0
12/15/200105:59:1 00:01 0.4 0.0
12/ 15/2001 07:14:1 00:01 0.4 0.0
BP Exploration Page 2 of 5 Milne Point, Alaska
~p1/o4/2002 13:14 Milne Point Unit
Monthly Gas Flaring Incident Report
For: Dec 2001
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
12/15/200110:14:+ 00:01 0.6 0.0
12/15/200112:44:+ 00:01 0.4 0.0
12/17/200120:59:+ 00:01 0.4 0.0
12/19/200114:29:+ 00:01 0.6 0.0
12/20/200105:09:+ 00:06 5.2 0.0
12/20/200117:55:+ 00:05 4.9 0.0
12!20/200118:13:+ 00:02 1.2 0.0
12/20/200118:21:+ 00:09 9.3 0.0
12/20/200120:42:+ 00:03 1.6 0.0
12/20/200122:24:+ 00:06 4.0 0.0
12/20/200122:43:+ 00:02 2.4 0.0
12/21/200111:14:+ 00:01 0.5 0.0
12/21/200113:14:+ 00:16 8.5 0.0
12/21/200113:31:+ 00:14 8.6 0.0
12/21/200113:54:+ 00:06 5.7 0.0
12/23/200112:14:+ 00:01 0.6 0.0
12/26/200105:58:+ 00:02 1.1 0.0
12/26/200113:56:+ 00:04 2.0 0.0
12/26/200118:44:+ 00:31 54.3 2.3
12/26/200119:22:+ 00:08 5.8 0.0
12/27/200104:25:+ 00:05 2.4 0.0
12/27/200104:39a 00:06 8.2 0.0
12/27/200104:57:+ 00:03 1.5 0.0
12/27/200112:55:+ 00:05 4.9 0.0
12/27/200113:41:+ 00:04 1.2 0.0
12/27/200116:42:+ 00:03 2.3 0.0
12/27/200116:58:+ 00:02 1.8 0.0
12/27/200117:39:+ 00:06 5.8 0.0
12/27/200117:55:+ 00:05 3.5 0.0
12/27/200118:12:+ 00:03 3.5 0.0
12/27/200119:14:+ 00:01 0.2 0.0
12/27/200119:24:+ 00:06 7.9 0.0
12/27/2001 19:47:+ 00:13 15.7 0.0
12/27/200120:09:+ 00:21 3.9 0.0
12/27/200121:09:+ 00:06 5.2 0.0
12/27/200122:07:+ 00:08 9.0 0.0
12/27/200122:22:+ 00:08 4.0 0.0
12/27/200123:03:+ 00:27 52.7 2.8
12/27/200123:41:+ 00:04 5.2 0.0
12/28/200100:09:+ 00:06 10.0 0.0
12/28/200100:20:+ 00:10 17.7 0.9
Comment
BP Exploration Page 3 of 5 Milne Point, Alaska
,pvo4i2oo2 13:14 Milne Point Unit
Monthly Gas Flaring Incident Report
y For: Dec 2001
F
Flare Name: Flare 1
nplanned Events less than or equal to 1 hour
Duration =Volume (MSCF) _
Start Time (hh:mm) Flare Assist Cause
12/31/200118:29a 00:01 0.2 0.0
Comment
BP Exploration Page 4 of 5 Milne Point, Alaska