FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Exploration (Alaska) Inc. Northstar Jan-Ol
Disposition
Volume MCF"
1. Sold 0
2, Reinjected 0
3, Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
b. Used for lease operations Assist
Fuel 0
14,749
7. Other 0
TOTALitems 1-7 14,749
8, NGL gas equivalent produced 0
9. Purchased gas 14,749
10, Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge,
Signature Title ~G~- r'~SC Date Z~~Y o!
Form 10-422
Rev. 4/95
'Indicate contribution of each pool to total.
Pool Name ode Percent
Official Use Only-Flaring Authorization>1 hrs
1, Safety F
2. Lease CF
3. Conserv, rposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14,65 psia and to a
temperature of 60 degrees F, Report
due by the 20th of the month folowing
the month of disposition, Authority 20
AAC 25,235,
~/~ y
m
;v
0
~~
~ y
o a
(~ y
O
0
rn
w
rn
N
O
O
~~
~_
~~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Exploration (Alaska) Inc. Northstar Feb-O1
Disposition
Volume MCF'
'Indicate contribution of each pool to total.
Pool Name ode Percent
~~
~/l~
D
N
0
O
1. Sold 0
2. ReinJected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
15,489
7. Other 0
TOTAL items 1-7 15,489
8. NGL gas equivalent produced 0
9. Purchased gas 15,489
10, Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
~j~,L ~~~0(.~ Title (U ~nwl~ `7~Date 3 ~~} d
Form 10-422
Rev, 4/95
Official Use Only-Flaring Authorization>1 hr.
1, Safety F
2. Lease MCF
3, Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F, Report
due by the 20th of the month folowing
the month of disposition, Authority 20
AAC 25.235.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Ex loration Alaska) Inc. Northstar Mar-Ol
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
20,379
7. Other 0
TOTAL items 1-7 20,379
8. NGL gas equivalent produced 0
9. Purchased gas 20,379
10. Transferred from:
11. Transferred to:
I hereby certif that the regoing is true and correct to the best of my knowledge.
Signature Title 1~h~Gl. ~'~X Date ~l~h 0
*Indicate contribution of each pool to total.
Pool Name ode Percent
Official Use Only-Flaring Authorization>1 hr.
1. Safety F
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note; All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
due by the 20th of the month folowing
the month of disposition. Authority 20
AAC 25.235.
~~~g~ov
\~~
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Exploration (Alaska) Inc. Northstar Apr-O1
Disposition
Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4, Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
15,073
7. Other 0
TOTALitems 1-7 15,073
8. NGL gas equivalent produced 0
9. Purchased gas 15,073
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing i true and correct to the best of my knowledge.
Signature ~ Title y1~1~,(!, 'fY~X Date S~ n ~ o
Form 10-422
Rev, 4/95
'Indicate contribution of each pool to total,
Pool Name ode Percent
Official Use Only-Flaring Authorizaton>1 hr.
1. Safety CF
2. Lease MCF
~i
3, Conserv. Purposes MCF
Commissioner Date
',Note; All volumes must be corrected
to pressure of 14,65 psia and to a
temperature of 60 degrees F, Report
due by the 20th of the month folowing
the month of disposition. Authority 20
AAC 25.235.
/d/~~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Exploration (Alaska) Inc. Northstar May-Ol
Disposition
Volume MCF`
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
15,236
7. Other 0
TOTALitems 1-7 15,236
8. NGL gas equivalent produced 0
9, Purchased gas 15,236
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature, ~' ~i~ti Title Vl/t (~ f~, i !Xk Date (0 3~0
'Indicate contribution of each pool to total.
Pool Name ode Percent
Official Use Only-Flaring Authorization>1 hr.
1. Safety CF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note; All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
due by the 20th of the month folowing
the month of disposition. Authority 20
AAC 25.235.
y/~~~ ~
Form 10-422
Rev. 4/95
. ~ ~. ,
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Exploration (Alaska) Inc. Northstar Jun-Ol
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required-See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
10,870
7. Other 0
TOTAL items 1-7 10,870
8. NGL gas equivalent produced 0
9. Purchased gas 10,870
10. Transferred from:
11. Transferred to:
I hereby certify that th foregoing is true and correct to the best of my knowledge.
Signature ,, Title I~VI~G6L t'A'SC Date Z p
`Indicate contribution of each pool to total.
Pool Name Code Percent
Official Use Only-Flaring Authorization>1
1. Safety MCF
2. Lease MCF
3. Conserv. Purpos MCF
Commissioner Date
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60 degrees F. Report
due by the 20th of the month folowing
the month of disposition. Authority 20
AAC 25.235.
~~
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Exploration Alaska) Inc. Northstar Jul-01
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required••See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for tease operations Assist
Fuel 0
4 062
7. Other 0
TOTAL items 1-7 4,062
8. NGL gas equivalent produced 0
9. Purchased gas 4,062
10. Transferred from:
11. Transferred to:
I hereby certify-ghat the~pregoing is true and correct to the best of my
Title M'(~.77~s~ Date
'Indicate contribution of each pool to total.
Pool Name o e Percent
Official Use Only-Flaring Authorizations hr~
t
1. Safety MCF
2. Lease ~~ MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
J V `~
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Ex loration (Alaska) Inc. Northstar Au -01
Disposition
Volume MCF"
'Indicate contribution of each pool to total.
Pool Name o e Percent
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
29
7. Other 0
TOTAL items 1-7 29
8. NGL gas equivalent produced 0
9. Purchased gas 29
10. Transferred from:
11. Transferred to:
II hereby certify that the oregoing is true and correct to the best of my knowledge.
Signature Title h1,v2 T ~ Date q ~tN/o i,
Official Use Only-Flaring Authorization>1 hr.
1. Safety ~...
2. Lease M
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
(month of disposition. Authority 20 AAC
v 9
f z^~
r--.<
ti
0
~,
d
a
~..
~.. ~~
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Ex loration (Alaska) Inc. Northstar Sep-01
Disposition
Volume MCF`
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour
(Supplemental report required••See 20 AAC 25.235) 0
5. Pilot and Purge 0
6. Used for lease operations Assist
Fuel 0
28
7. Other 0
TOTAL items 1-7 28
8. NGL gas equivalent produced 0
9. Purchased gas 28
10. Transferred from:
11. Transferred to:
I hereby certi that the f regoing is tru and correct to the best of my knowledge.
Signature Title ~'''i62 Tftk Date /0
`Indicate contribution of each pool to total.
Pool Name o e Percent
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 Asia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
rv„.~-,~r~. BP Exploration (Alaska) Inc. Northstar Oct-01 REV 1
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 20,760
3. Flared or vented less than 1 hour 86,188
4. Flared or vented greater than 1 hour
{Su ementel report required--See 20 MC 25235) 0
5. Pilot and Purge 2,759
6. Used for lease operations Assist
Fuel (at island)
Fuel PS#1 htr 0
87,688
5 915
7. Other 0
TOTAL items 1-7 203,310
8. NGL gas equivalent produced 0
9. Purchased gas 202,564
10. Transferred from:
11. Transferred to:
that th~¢ foregoing is true and correct to the best of my
Title /'MG`L 7'f~sr Date L
'Indicate contribution of each pool to total.
ool Name o e ercent
Official Use Only'.-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes .MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month following the
'.month of disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
BP EXPLORATION (ALASKA) INC.
NORTHSTAR UNIT
GAS FLARING INCIDENT REPORT
OCTOBER, 2001
Page 1
Unplanned Events less than or equal to 1 hour ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which Not required for unplanned events which
are less than or equal to 1 hour are less than or equal to 1 hour
TOTAL 0
Unplanned Events greater than 1 hour ~
DATE. TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ~
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/1/2001 519 Plant start-up, purge and pressure testing
10/2/2001 278 Plant start-up, purge and pressure testing
10/3/2001 153 Plant start-up, purge and pressure testing
10/4/2001 204 Plant start-up, purge and pressure testing
10/5/2001 403 Plant start-up, purge and pressure testing
10/6/2001 445 Plant start-up, purge and pressure testing
10/7/2001 420 Plant start-up, purge and pressure testing
10/8/2001 107 Plant start-up, purge and pressure testing
10/9/2001 1,682 Plant start-up, purge and pressure testing
10/10/2001 4,170 Plant start-up, purge and pressure testing
10/11/2001 4,093 Plant start-up, purge and pressure testing
10/12/2001 3,279 Plant start-up, purge and pressure testing
10/13/2001 3,997 Plant start-up, purge and pressure testing
10/14/2001 4,419 Plant start-up, purge and pressure testing
10/15/2001 3,722 Plant start-up, purge and pressure testing
10/16/2001 3,338 BESD of Total Plant due to PLC Problem.
10/17/2001 3,549 Plant start-up, purge and pressure testing
10/18/2001 3,996 Plant start-up, purge and pressure testing
10/19/2001 4,267 Flare event due to HP"A" 4th & 5th stage seal gas line blowdown, due to commisioning.
10/20/2001 4,030 Flare event due to HP"A" 4th & 5th stage seal gas line blowdown, due to commisioning.
10/21/2001 4,238 2 HP"A" Compressor blowdowns due to Start-up commisioning
10/22/2001 4,116 3 HP"A" Compressor blowdowns due to Start-up commisioning
10/23/2001 4,649 6 HP"A" Compressor blowdowns due to Start-up commisioning
10/24/2001 3,488 3 HP"A" Compressor blowdowns due to Start-up commisioning
10/25/2001 4,187 9 HP"A" Compressor blowdowns due to Start-up commisioning
10/26/2001 2,644 2 HP"A" Compressor blowdowns due to Start-up commisioning
10/27/2001 3,928 1 HP"A" Compressor blowdowns due to Start-up commisioning
BP EXPLORATION (ALASKA) INC.
NORTHSTAR UNIT
GAS FLARING INCIDENT REPORT Page 2
OCTOBER, 2001
10/28/2001 3,593 1 HP"A" Compressor blowdowns due to Start-up Commisioning
10/29/2001 3,429 2 HP"A" Compressor blowdowns due to Start-up Commisioning
10/30/2001 1,998 1 HP"A" Compressor blowdowns due to Start-up Commisioning
10/31/2001 2,847 BESD of Total Plant due to PLC Problem.
TOTAL 86,188
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See attachments See attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour & not 86,188
exceeding 5,000 MCF
Planned Events > 1 hour and 0
exceeding 5,000 MCF
Pilot Purge 2,759.
TOTAL FLARED VOLUME 88,947
~~Q~[~ Ofd adQ~~Q/
CONBE ~Ofl CO~nauS6iO.Y
Mr. Robert Reynolds
Manager, State Taxes and Royalties
BP Exploration (Alaska)
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: October 2001 Gas Disposition Report, Northstar Field
Dear Mr. Reynolds,
TONY KNOWLES, GOVERNOR
333 W. 7TM AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 27&7542
December 24, 2001
The Alaska Oil and Gas Conservation Commission (AOGCC) has reviewed the BPXA Gas
Disposition submission for October 2001 and is in need of additional information for the Planned
Events Less Than or Equal to 1 Hour and Not Exceeding 5000 Mcf. The AOGCC reviews the
monthly gas disposition reports to determine if the Operator is acting in accordance with good oil
field engineering practices and conservation purposes. At its discretion, the Commission will
either authorize the flaring or classify the flaring as waste.
For each Northstar Facility event where gas was flared or vented less than one hour in October
2001, please provide the following additional information: (a) date(s) of flaring event(s); (b) actual
time(s) flaring occurred; (c) total time flared per event; (c) a brief description of the activity
underway or problem troubleshooting associated with the flared volumes; and (d) a brief
description of the action(s) taken to minimize the flared gas volume.
We look forward to a written response by the end of the business day, Tuesday, January 15,
2002. Should you have any questions with respect to our information request, please contact me
at 793-1231.
Sincerely,
Winton Aubert, PhD.
Petroleum Engineer
~' ~ ~ Q~ C~ ` ~ F'! ~ C ^T tom.. ~~. ( ~°`~ ~e~,~ ~ ~~k-'ys*-' t ~-N• ,~C ~.1 ~ :f Vhf'
Cc.E~.~r,.,x.~.. ~~-~-.,,,~. ,~. ~L~.Z tti.'r-w> ~l_c_~1.~-~-G.1~. t- ~~~` t,~.~
t~~Et..$_~`_ ~+.~Q..~,..1 Lt.~ ~,~rt ~::/ lit ~u_,It..~ ~tt.~~-o- `~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar _ BP Exploration Alaska inc. Northstar Nov-01 REV 1
Disposition
1. Sold
Volume MCF'
0
2. Reinjected 1,056,591
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 189,703
(Su emental repoA required-See 20 AAC 25.235)
5. Pilot and Purge 2,664
6. Used for lease operations Assist 0
Fuel (at island) 186,046
Fuel (Caribou Crossing) 12,392
Fuel PS#1 htr 5 911
7. Other 0
TOTAL items 1-7 1,453,307
8. NGL gas equivalent produced 0
9. Purchased gas 690,653
10. Transferred from:
11. Transferred to:
I hereby certify at the f regoing is tr a and correct to the best of my knowledge.
Signature Title /lit c. ~ TLtiY Date ~27 f O'L
'Indicate contribution of each pool to total..
Pool Name o e Percent
Official .Use Only-Flaring Authorization>i hr.
1. Safety MCF
2. Lease ~ ~'C/, ~~ 7 MCF
3. Consero. Purposes MCF
Commisst~er ate
QIL Ir1G~- Sl! a/u~
Vote: All volumes must be corrected to
pressure of 14.65 psia and to a
lemperature of 60 degrees F. Report due
~y the 20th of the month following the
month of disposition. Authority 20 AAC
Form 10-422
Rev. 4/95
Gas Flaring Incident Report
BP Northstar
November 2001
Volume Flared less than 1 hour: 0
Volume Flared greater than 1 hour: 189,702 Total Volume Flared: 189,702
Start Date/Time End Date/Time MCF Volume Incident Cause/Description Remediation Taken
Un 1lanned Events less than ore ual to 1 hour
Total 0
Un tanned Events reater t#tan 1 hour
Total: 39,548
11/5/01 0:00 11/5/01 23:59 1,999 Plant Shut-down, shorted breaker Re air breaker
11/11/01 0:00 11/11/01 23:59 2,852 HPA fuel as vent solenoid Re air Solenoid
11/12/01 0:00 11/12/01 23:59 895 HPA fuel as vent solenoid Re air Solenoid
11/15/01 0:00 11/15/01 23:59 2,221 Plant Shut-down, NGL Reboiler Resolve NGL Vessel issues
11/16/01 0:00 11/16/01 23:59 4,548 Plant Shut-down, NGL Reboiler Resolve NGL Vessel issues
11/17/01 0:00 11/17/01 23:59 1,307 HP Se arator Control Valve Leaks find and re air leaks
11/18/01 0:00 11/18/01 23:59 1,515 HP Se arator Control Valve Leaks find and re air leaks
11/19/01 0:00 11/19/01 23:59 951 HP Se arator Control Valve Leaks find and re air leaks
11/20/01 0:00 11/20/01 23:59 634 HP Se arator Control Valve Leaks find and re air leaks
11/22/01 0:00 11/22/01 23:59 4,181 HPA Shut-down Brin HPA back on line
11/25/01 0:00 11/25/01 23:59 4,852 Plant Shut-down, NGL Se arator followed b HPA restart roblems Production Cut to minimize flarin
11/26/01 0:00 11/26/01 23:59 13,594 Plant Shut-down, NGL Se arator followed b HPA restart roblems Production Cut to minimize flarin
Planned Events less than or ec ual to 1 hour
Total: 0
Page 1 of 2
Gas Flaring Incident Report
BP Northstar
November 2001
Start Date/Time End Date/Time MCF Volume Incident Cause/Description Remediation Taken
Planned Events renter than 1 hour
Total: 150,155
11/1/01 0:00 11/1/01 23:59 876 LP Com ressor Commissionin See LP Com ressor discussion
11/2/01 0:00 11/2/01 23:59 2,135 LP Com ressor Commissionin See LP Com ressor discussion
11/3/01 0:00 11/3/01 23:59 3,450 LP Com ressor Commissionin See LP Com ressor discussion
11/4/01 0:00 11/4/01 23:59 1,733 LP Com ressor Commissionin See LP Com ressor discussion
11/5/01 0:00 11/5/01 23:59 3,365 LP Com ressor Commissionin See LP Com ressor discussion
11/6/01 0:00 11/6/01 23:59 5,405 LP Com ressor Commissionin See LP Com ressor discussion
11/7/01 0:00 11/7/01 23:59 3,212 LP Com ressor Commissionin See LP Com ressor discussion
11/8/01 0:00 11/8/01 23:59 3,500 LP Com ressor Commissionin See LP Com ressor discussion
11/9/01 0:00 11/9/01 23:59 3,205 LP Com ressor Commissionin See LP Com ressor discussion
11/10/01 0:00 11/10/01 23:59 3,667 LP Com ressor Commissionin See LP Com ressor discussion
11/11/01 0:00 11/11/01 23:59 3,119 LP Com ressor Commissionin See LP Com ressor discussion
11/12/01 0:00 11/12/01 23:59 3,096 LP Com ressor Commissionin See LP Com ressor discussion
11/13/01 0:00 11/13/01 23:59 4,163 LP Com ressor Commissionin See LP Com ressor discussion
11/14/01 0:00 11/14/01 23:59 4,212 LP Com ressor Commissionin See LP Com ressor discussion
11/15/01 0:00 11/15/01 23:59 1,346 LP Com ressor Commissionin See LP Com ressor discussion
11/16/01 0:00 11/16/01 23:59 2,710 LP Com ressor Commissionin See LP Com ressor discussion
11/17/01 0:00 11/17/01 23:59 3,798 LP Com ressor Commissionin See LP Com ressor discussion
11/18/01 0:00 11/18/01 23:59 3,461 LP Com ressor Commissionin See LP Com ressor discussion
11/19/01 0:00 11/19/01 23:59 3,352 LP Com ressor Commissionin See LP Com ressor discussion
11/20/01 0:00 11/20/01 23:59 3,063 LP Com ressor Commissionin See LP Com ressor discussion
11/21/01 0:00 11/21/01 23:59 3,421 LP Com ressor Commissionin See LP Com ressor discussion
11/22/01 0:00 11/22/01 23:59 5,023 LP Com ressor Commissionin See LP Com ressor discussion
11/23/01 0:00 11/23/01 23:59 8,451 LP Com ressor Commissionin See LP Com ressor discussion
11/24/01 0:00 11/24/01 23:59 10,374 LP Com ressor Commissionin See LP Com ressor discussion
11/25/01 0:00 11/25/01 23:59 6,307 LP Com ressor Commissionin See LP Com ressor discussion
11/26/01 0:00 11/26/01 23:59 3,283 LP Com ressor Commissionin See LP Com ressor discussion
11/27/01 0:00 11/27/01 23:59 9,873 LP Com ressor Commissionin See LP Com ressor discussion
11/28/01 0:00 11/28/01 23:59 3,107 LP Com ressor Commissionin See LP Com ressor discussion
11/29/01 0:00 11/29/01 23:59 4,373 LP Com ressor Commissionin See LP Com ressor discussion
11/30/01 0:00 11/30/01 23:59 5,493 LP Com ressor Commissionin See LP Com ressor discussion
11/1/01 0:00 11/1/01 23:59 3,536 HPA Start-u roblems Work HP Start U Problems
11/2/01 0:00 11/2/01 23:59 8,562 HPA Start-u roblems Work HP Start U Problems
11/3/01 0:00 11/3/01 23:59 537 HPA Start-u roblems Work HP Start U Problems
11/4/01 0:00 11/4/01 23:59 1,639 HPA Start-u roblems Work HP Start U Problems
11/28/01 0:00 11/28/01 23:59 1,698 Plant Shutdown for NS31 conversion Finish conversion work
11/29/01 0:00 11/29/01 23:59 7,292 Plant Shutdown for NS31 conversion and HPA Shut-down for PLC re air Finish conversion work
11/30/01 0:00 11/30/01 23:59 4,317 HPA Shut-down for PLC re air Re air PLC
Page 2 of 2
LOOZ `aagwaoaa g ~
•~(~uoud ;say6ly ayl y;!nn
pansand 6ulaq s! ss6 dq ;o uolssaadwoo snonul~uoo ;o }uawysggs;sa pus ao;ow aye }o alsdaa ayl
•pa~ona;suoo 6ulaq ~I}uaaano s! yolynn psoa aoI ay;;o ~(3lIlgsllsns uo
puadap IIlnn;uawaoaldaa ay; 6ul;oa;;3 '(sql 000`0£) 3y6lann pua azls slI pus alnpow uolssaadwoo
as~sy~oN ay; my;!nn aossaadwoo d~ ay;;o uol;cool ay; o; anp ~o;}a ~usol;Iu6ls aalnbaa IIInn ao}ow
ay} 6uloslda» •asaoypsaa u! ~I}uaaano aasds ay; yIIM ao;ow ay; aosldaa o} saanpaooad 6uldoianap
uo 6uI~{aonn aas ann `tiaulyosw 6ul;slxa ay; 6ul;as;s pus 6ulalsdaa uo 6ul~Iaonn o; snoausllnwlS
•s6ulpulnn ao}ow ay; o; salsdaa ay; 6ul;oa;}a ails uo awl;;o;unows;usol;!u6!s
~;uads osis ansy (aousua3ulsW Isu;snpul s~Issiy) WIb' •(wa;s~(s Ioa}uoo ay} ao; alglsuodsaa)
aassaaa `(aaan;os}nusw ao;ow ay;) asnoy6ul;saM-ooal `(aopuan aossaadwoo ay;) oodo~
-ssl~y woa} sanl;sluasaadaa papnloul ansy asayl •aw!; ay; Its ssal ao aaow a;Is uo;uawd!nba
aye }o ~(Iddns ay} ao; alglsuodsaa salusdwoo ay;;o Its woa} sdaa aopuan psy ansy ann aossaadwoo
aye 6uluolsslwwoo;o ssaooad ay; uI •6uluuna aulyosw ayl 6uI~~a6 }o y}sd Isol3lao aye uo uaps}
Its ansy pus ~IIsl;uanbas paaanooo ansy ;uawdlnba sly; y;Inn paoualaadxa ansy ann swalgoad ayl
•6uluolsslwwoo ao; algsllsns ss6 }o awnlon
nnol ay} pus s3IwII 6ullsaado 3y6I1 ay; ~(q pasnso uaaq ansy s~(slap Isuolllppd •suolssooo a;sasdas
Z uo s6ulpulnn aolow Isola}oala dH 0009 aye }o saanlls; pus sanssl uol;sagln do ~s;s papnloul
ansy ;uawd!nba sly; y}Inn swalgoad 6uluolsslwwo~ •;osww £Z ~ aq o; pa;swl;sa sI aossaadwoo
d~ ay};o ~(3IIIgsllsnsun ay} o; algs;ngla;;s aagwanoN;o y;uow ay; 6uunp paasi; ss6;o awnlon ayl
»OSS3adW0~ dl H11M SW3l8Oad JNINOISSIWWOO Ol 3~8tJ1(181>=111`d JNIb`dld
laOd3>=1 JNI»`d~d 4~38W3nON 4~d1SH1>=ION
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
Northstar BP Ex loration Alaska) Inc. Northstar Dec-01
Disposition
1. Sold
Volume MCF'
0
2. Reinjected 2,619,424
3. Flared or vented less than 1 hour 20,294
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 211,874
5. Pilot and Purge 2,759
6. Used for lease operations Assist
Fuel (at island)
Fuel (Caribou Crossing)
Fuel PS#1 htr 0
204,477
19,099
13 552
7. Other 0
TOTAL items 1-7 3,091,479
8. NGL gas equivalent produced 0
9. Purchased gas 1,168,813
10. Transferred from:
11. Transferred to:
I hereby certi hat the regoing is tr and correct to the best of my knowledge.
Signature ~a~ Title itilc~~L'C~CSC Date ! 6 Z
'Indicate contribution of each pool to total.
Pool Name o e Percent
Official Use Only-Flaring Authorization>1 hr.
1. Safety MCF
2. Lease ~ ' ~ ~ ~ MCF
3. Conserv. Purposes MCF
~~ "~ -s'
Commissio r ~/ S O .~-
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Form 10-422
Rev. 4/95
Gas Flaring Incident Report
BP Northstar
Page 1 of 2
Gas Flaring Incident Report
BP Northstar
Start DatelTime
End Date/Time MCF
Volume
Incident/Cause Descri lion
Remediation Taken
12/18/01 12:00 AM 12/18/01 11:59 PM 9,739 LP Compressor Commissioning See LP Compressor Discussion
12/19/01 12:00 AM 12/19/01 11:59 PM 10,247 LP Compressor Commissioning See LP Compressor Discussion
12/20/01 12:00 AM 12/20/01 11:59 PM 8,704 LP Compressor Commissioning See LP Compressor Discussion
12/21/01 12:00 AM 12/21/01 11:59 PM 3,958 LP Compressor Commissioning See LP Compressor Discussion
12/22/01 12:00 AM 12/22/01 11:59 PM 0 LP Compressor Commissioning See LP Compressor Discussion
12/23/01 12:00 AM 12/23/01 11:59 PM 3,323 LP Compressor Commissioning See LP Com ressor Discussion
12/24/01 12:00 AM 12/24/01 11:59 PM 3,196 LP Com ressor Commissioning See LP Compressor Discussion
12/25/01 12:00 AM 12/25/01 11:59 PM 0 LP Compressor Commissioning See LP Compressor Discussion
12/26/01 12:00 AM 12/26/01 11:59 PM 715 LP Compressor Commissioning See LP Compressor Discussion
12/27/01 12:00 AM 12/27/01 11:59 PM 3,828 LP Compressor Commissioning See LP Compressor Discussion
12/28/01 12:00 AM 12/28/01 11:59 PM 3,907 LP Compressor Commissioning See LP Compressor Discussion
12/29/01 12:00 AM 12/29/01 11:59 PM 1,397 LP Compressor Commissioning See LP Compressor Discussion
12/30/01 12:00 AM 12/30/01 11:59 PM 0 LP Compressor Commissioning See LP Compressor Discussion
12/31/01 12:00 AM 12/31/01 11:59 PM 3,180 LP Compressor Commissioning See LP Compressor Discussion
Total: 201,789
Page 2 of 2
•puelsl ay; uo ao~ow sly gaols o; sueld aae away} pue adols ayi. uo sl ao~ow slyl •ao;ow do-~{oeq
e pa>.sa} pue paanooad say d8 `swalgoad 6ulpwnn ao}ow aan;n;;o ~}lllglssod ay; ao; paaedaad aq of
•passaappe aaann swalgoad
do-fie}s se %gL pa6eaane do-fie}s sly; aa~;e awl; d~ • lZ aagwaoaa uo paule~e suol;eaado
pave}sns pue g; aagwaoad uo pa;aldwoo seen ~{aonn aledaa 6wpulnn ao}ow ayl •aagwaoaa
o~ul panul}uoo aagwanoN ul uaas swalgoad ayl •;osww ZOZ aq o>, pa>.ewl~sa sl aossaadwoo
dl a4};o ~3lllgelleneun aye o~ alge;nglaue aagwaoaQ;o y;uow ay; 6ulanp panel; se6;o awnlon ayl
aaquaaaaa
'~3!aolad isay6iy ayl yl!M
pansand 6ulaq sl se6 dl;o uolssaadwoo snonul}uoo;o ~uawysllge>.sa pue ao~ow ay>.;o aledaa ayl
•pa;ona}suoo 6ulaq ~(l~uaaano sl yolynn peoa aol ay;;o ~(llllgellene uo
puadap II!nn;uawaoeldaa aye 6u!loa;;3 '(sql 000`0£);y6lann pue ails sll pue alnpow uolssaadwoo
ae;sy~oN ay; myllN- aossaadwoo dl ay;;o uol~eool aye o~ anp ~o;;a >.ueol;lu6ls aalnbaa II!nn ao;ow
ay; 6uloeldaH •asaoypeaQ ul ~I;uaaano aaeds ayl y3lM ao}ow aye aoeldaa o} saanpaooad 6uldolanap
uo 6ul~laonn age ann `i(.raulyoew 6ul;slxa ay; 6ul~e~s pue 6ulaledaa uo 6u1~{aonn of snoauellnwlS
•s6ulpulnn ao~ow ay} o; saledaa ay; 6ul;oa;;a ails uo awl;;o;unowe }ueol;lu6ls
e;uads osle aney (aoueua>luleW lela~snpul e~{sely) Wld •(wa}s~(s log;uoo ay; ao; alglsuodsaa)
aassaaa `(aaan;oe;nuew ao~ow ay;) asnoy6ul;saM-ooal `(aopuan aossaadwoo ay;) oodoO
-sel;y won; sang;e;uasaadaa papnloul aney asayl •awl} ay; Ile ssal ao aaow a;ls uo;uawdlnba
ay;;o ~(lddns ay; ao; alglsuodsaa saluedwoo ay;;o Ile wog; sdaa aopuan pey aney ann aossaadwoo
ay>. 6uluolsslwwoo;o ssaooad ay; ul •6uluuna aulyoew ay} 6u1;}a6;o y;ed leo!3!ao ay; uo uape;
Ile aney pue ~llel~uanbas paaanooo aney ;uawdlnba sly; y;lnn paoualaadxa aney ann swalgoad ayl
•6uluolsslwwoo ao; algellene se6 ;o awnlon
nnol ay; pue s}lwll 6ul;eaado;y6l; aye ~(q pasneo uaaq aney s~(elap leuol}lppy •suolseooo a;eaedas
Z uo s6ulpulnn ao;ow Isola}Dale dH 0005 ay;;o saanlle; pue sanssl uol;eagln do ~e;s papnloul
aney ~uawdlnba sly; y3l^n swalgoad 6uluolsslwwoO •;osww EZ~ aq o; pa;ewllsa sl aossaadwoo
dl ay};o ~3!I!gel!eneun ay} o~ alge}nqu~e aagwanoN;o y;uow ay} 6ulanp panel; se6;o awnlon ayl
aaquaanoN
>=1OSS3adW0~ dl HlIM SW318O~1d JNINOISSIWWO~ Ol 318b'1f181>=111`d JNlab'ld
l~lOdB» JNI>=1dld >:ib'1SH1>:ION