Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPHILLIPS - CCPALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT PHILLIPS ALASKA, INC. EASTERN OPERATING AREA-PBU Jan-O1
Disposition *Indicate contribution of each pool to total.
1. Sold 767,017 Pool Name Code Percent
2. Reinjected 212,986,317 PRUDHOE 640150 99.81%
YwdhocRsa knit :
3. Flared or vented less than 1 hour 3,557 `~~~~~=7a~~~°"
a,dc~~»a 640158 O.I9`.G
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 29,520
6. Used for lease operations Fuel 5,667,602
Assist 0
7. Other
0 ................................................................
................................................................
Official Use:Only--Fiaiiti Aukliorization >: 1:1Zr .:::::::::::::: >;:
1
~~
TOTAL items 1 - 7 219,454,013 1. Safety .
MCF
8. NGL gas equivalent produced 0 2. Lease Use " _,~/ MCF
9. Purchased gas 3. Conserv. Purposes ~`+ MCF
10. Transferred from: FS1, FS2, FS3, 240,878,805
GC1, GC2, GC3
Conunissioner Date m
11. Transferred to: CGF 23,320,718 y
Note: All volumes must be corrected to = `T~
~
Remarks: Pool Code Percentage only apply to reinjected gas ~
pressure of 14.65 psia and to a temperature of ~ v W
60 degrees. F. Report due by the 20th of the o c~ ~-"'
I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. to ~ rn
Authority 20 AAC 25.235. ~ 0 0
Ji f ~~,(,~ ~/ Title: SUPERVISOR
Signature:
Z ~3 8)
o
3
C _
N
Form 10-~22 (Revised ~/9~) .,~~~~~ ~ v-~~~
0
~~~
C~
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CCP
January-2001
DATE
TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 3,557
Total over/under 1 Hr/5MM 3,557
Pilot/Purge 29,520
Continuous Assist
TOTAL FLARED/VENTED 33,077
v
n
~ rn ..
r~
W ~
~
~~
o ~
~-'
ra q
~ ~ C7 ~
(~ fV
_
0
3
N.
0
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CPNTRAL COMPRESSOR PLANT PHILLIPS ALASKA INC. EASTERN OPERATING AREA-PBU Feb-O1
Disposition *Indicate contribution of each pool to total.
1. Sold 685,369 Pool Name Code Percent
2. Reinjected 194,438,343 PRUDHOE 640150 99.75%
Ylvdhc,e Bay Gnit.
3. Flared or vented less than 1 hour 733 r;'d"'~~'~ `°"
UndeP~ned
640158
0.25~'v ''
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 26,814
6. Used for lease operations Fuel 5,081,351
Assist 0
7. Other
0 .. ..
Offi.caTiJse:Orily==~iaiin ~Atitliori~aiion> l:hr .:::::::::::::::~:"
TOTAL items 1 - 7 200,232.,610 1. Safety ~.--~-""NICF
:~-
.
f~ °.
' ~
°
8. NGL gas equivalent produced 0 2. Lease Use :~ ,f
MCF
°`
f " ,,
9. Purchased gas 3. Conserv. Purposes /,= `^ MCF
10. Transferred from: FS1, FS2, FS3, 218,729,182
GC1, GC2, GC3
Commissioner Date
11. Transferred to: CGF 20,306,622
Note: All volumes must be corrected to
Remarks: Pool Code Percentage only apply to reinjected gas pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition.
Authority 20 AAC 25.235.
r
;~,,~,1,../ Title: SUPERVISOR
Signature: ~'~ e~
,
Forni 10- 22 ( evised /9 )
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CCP
February-2001
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 733
Total over/under 1 Hr/5MM 733
Pilot/Purge
Continuous Assist
26,814
TOTAL FLARED/VENTED 27,547
'" ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL COMPRESSOR PLANT Operator
PHILLIPS ALASKA, INC. Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
Mar-O1
Disposition *Indicate contribution of each pool to total.
1. Sold 789,600 Pool Name Code Percent
2. Reinjected 228,987,643 PRUDHOE 640150 99.75%
3. Flared or vented less than 1 hour
0 Prudhoe Bsy° IInii
~~~~,;"t~~ ~t'"
t~„d~r~~~d
640158
02~`,~~
4. Flared or vented greater than 1 hour
(Supplemental report required--See 20 AAC 25.235) 0
5. Pilot and Purge 30,245
6. Used for lease operations Fuel
Assist 5,928,218
0
7.Other
0 ................................................................
................................................................
Offi~ialUse:Only=;Fiariii Autliorizatioi[ > 1:~ir.::: ;:::::: ;;:::::
TOTAL items 1 - 7 235,735,706 1. Safety 'MCF
j .i
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 3. Conserv. Purposes / MCF
f
10. Transferred from: FS1, FS2, FS3,
GCl, GC2, GC3 257,220,262
Commissioner Date
11. Transferred to: CGF 23,655,209
Note: All volumes must be corrected to
Remarks: Pool Code Percentage only apply to reinjected gas pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge.
e~ ~ ~ / r /' ~ ~~ ~~ ~
Signature: ~~r 1~~,tTjY~p ! " U~-~d`'„`~~~ Title: SUPERVISOR month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Devised ~%9~) v~~~V~ ~V-~~~
PHILLIPS ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CCP
March-2001
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 0
Total over/under 1 Hr/5MM 0
Pilot/Purge 30,245
Continuous Assist
TOTAL FLARED/VENTED 30,245
PBU PRODUCER'S REPORT OF GAS DISPOSITION
Alaska Oil & Gas Conservation Comm Exxon Company USA Forest Oil Corp.
Attn: Ms. Wendy Mahan Joint interest Acctg. Attn: Nancy Reinhardt
3001 Porcupine Drive Tracie Hutzler, Rm 1419-L 1600 Broadway., Suite 2200
Anchorage, Alaska 99501 P. O. Box 4707 Denver CO 80202
Houston, Texas 77210
Chevron U.S.A., Inc.
Attn: NOVJ Manager
P. O. Box 36366
Houston, Texas 77236
Chevron USA, Inc.
Attn: Virgil Reyes
P. O. Box J, Section 981
Concord, California 94524
BP Exploration, Inc.
Attn: Dianna Sommer MB7-2
P. O. Box 196612
Anchorage, Alaska 99519-6612
Jeff Morvant PD 807
State of Alaska
Oil and Gas Audit Division
550 W 7th Avenue, Suite 570
Anchorage, Alaska 99501-3557
Exxon Company USA
Attn: Prudhoe Bay 91-0250
Topping Plant
Houston, Texas 77210-4496
Phillips Petroleum Company
Attn: Ms. Carol Kulchinski
1380 Plaza Office Bldg
Bartlesville, Oklahoma 74004
Davis/Deveau - PRB 6
Eliana Uribe
Dept of Natural Resources
Royalty Section
550 W. 7'h Avenue, Suite 800
Anchorage, AK 99501
BP Exploration, Inc.
Attn: Mr. Gary Benson
P. O. Box 196612
Anchorage, Alaska 99519-6612
~~
~~,~ ~ ~. 2a~~
~`.t*1hh;~ ljii ~~ ~` ~~ ~:_:a~S. I,iGCl~~1i$[Q[`'•
!g,=:iliG~~~+~
a
~;
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 04/2001
Disposition Volume MCF*
1. Sold 738,193
2. Reinjected 204,266,836
3. Flared or vented less than 1 hour. 408
4. Flared or vented greater than 1 hour
(Sup lemental report re uired -See 20 AAC 25.235) 0
5. Pilot and Purge 29,521
6. Used for lease operations Fuel
Assist 5,387,243
0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 210,422,201
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 229,122,840
11. Transferred to: CGF 21,045,314
Remarks:
I hereby cent' a the regoing is t~.ae and correct to the best of my knowledge.
Signature: ,. ,f,~_ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
OfficialUse Only--Flavin Authorization > 1 hr.
n~~ _-.; .
1. Safety f J~,,~~' MCF
,'
2. Lease Use ~~ MCF
3. Consenr. Purposes ~ MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
ARCO ALASKA, INC.
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CCP
April-2001
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 408
Total over/under 1 Hr/5MM 408
Pilot/Purge
Continuous Assist
29,521
0
TOTAL FLARED/VENTED 29,929
..~...
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 05/2001
Disposition Volume MCF'
1. Sold 728,559
2. Reinjected 196,785,839
3. Flared or vented less than 1 hour. 5,407
4. Flared or vented greater than 1 hour
(Su lemental re ort required -See 20 AAC 25.235) 0
5. Pilot and Purge 30,284
6. Used for lease operations Fuel
Assist 5,183,563
0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 202,733,652
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 222,193,356
11. Transferred to: CGF 21,293,358
Remarks:
I hereby certi that t e foregoing is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR
'Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
Official Use Only--Flaring Authorization > 1 hr.
1. Safety MCF
2. Lease Use ~ ~~~ MCF
-~
3. Conserv. Purposes ~~ MGF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
Asia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CCP
May-2001
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over SMM 0
Less 1 HR/Less 5MM 5,407
Total over/under 1 Hr/5MM 5,407
Pilot/Purge 30,284
Continuous Assist 0
TOTAL FLARED/VENTED 35,691
bP
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P. O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
June 11, 2001
To: Recipients of the PBU Producer's Report of Gas Disposition
Enclosed is the May 2001 PBU Producer's Report of Gas Disposition.
If you have any questions about this report, please contact Gary Benson at
(907) 564-4604.
Sincerely,
n,
~~L-
Robert A. Reynolds
Manager, State Taxes and Royalty
~'
Enclosure
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 06/2001
Disposition Volume MCF"
1. Sold 669,775
2. Reinjected 186,449,810
3. Flared or vented less than 1 hour. 298
4. Flared or vented greater than 1 hour
Su lemental re ort required -See 20 AAC 25.235) 0
5. Pilot and Purge 29,392
6. Used for lease operations Fuel
Assist 5,205,688
0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 192,354,963
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 209,918,046
11. Transferred to: CGF 19,242,608
Remarks:
I hereby ce that th foregoing is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR
'Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
.Official Use Only--Flarin Authorization > i hr,
1. Safety CF
2. Lease Use ~ MCF
3. Conserv. Purposes ~ ~ ~ MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
Asia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
BP
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CCP
June-2001
DATE
TIME VOLUME MCF
DESCRIPTION OF INCIDENTS & CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 298
Total over/under 1 Hr/5MM 298
Pilot/Purge 29,392
Continuous Assist 0
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
TOTAL FLARED/VENTED 29,690
'"' 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 07/2001
Disposition Volume MCF'
1. Sold 653,153
2. Reinjected 187,503,120
3. Flared or vented less than 1 hour. 2,427
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 30,298
6. Used for lease operations Fuel
Assist 5,474,670
0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 193,663,668
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 210,083,933
11. Transferred to: CGF 18,199,136
Remarks:
I hereby certi th t the oregoing is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR
`Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
Official Use Only--Flarin ;,Authorization.> 1 hr.
1. Safety ~ ~~ CF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
Asia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Form 10-422 (Revised 4/95)
BP
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CCP
July-2001
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 2,427
Total over/under 1 Hr/5MM 2,427
PiloUPurge 30,298
Continuous Assist 0
TOTAL FLAREDNENTED 32,725
by
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P. O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
August 10, 2001
To: Recipients of the PBU Producer's Report of Gas Disposition
Enclosed is the July 2001 PBU Producer's Report of Gas Disposition.
If you have any questions about this report, please contact Gary Benson at
(907) 564-4604.
Sincerely,
Q.
Robert A. Reynolds
Manager, State Taxes and Royalty
Enclosure
RECEIVED
AUG 15 2001
Alaska Oil & Gas Cons. Commission
Anchorage
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 08/2001
Disposition Volume MCF'
1. Sold 660,050
2. Reinjected 193,298,611
3. Flared or vented less than 1 hour. 642
4. Flared or vented greater than 1 hour 0
Supplemental report re aired -See 20 AAC 25.235)
5. Pilot and Purge 30,357
6. Used for lease operations Fuel 5,355,490
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 199,345,150
8. NGL gas equivalent produced ~ 0
N
9. Purchased gas
sx ~ 0
~ ~
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 ,n ~ oo 217,168,410
~.
C7 N
11. Transferred to: CGF N~ o
s 19,588,130
Remarks:
I hereby certi that t foregoin is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
Official Use Onl --Flarin Authorization > 1 hr:
1. Safety CF
2. Lease Use ~ MCF
J'/
3. Conserv. Purposes ~ MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CCP
August-2001
.,.T~ T~e~c vni i inns luc~ nFSCRIPTION CF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 642
Total over/under 1 Hr/5MM 642
PiloUPurge 30,357
Continuous Assist 0
TOTAL FLAREDNENTED 30,999
ALASKA OIL AND GAS CONSERVATION COMMISSION
~ecn iTV RFpnRT nF PRODUCED GAS DISPOSITION
Facility
CENTRAL COMPRESSOR PLANT Operator
BP EXPLORATION, ALASKA Field(s)
EASTERN OPERATING AREA-PBU Month/Year of Disposition
09/2001
Disposition Volume MCF* 'Indicate contribution of each pool to total.
1. Sold 623,399 Pool Name Code Percent
2. Reinjected 176,955,461 PRUDHOE 640150 99.75%
3. Flared or vented less than 1 hour. 1,143 PBU Midnight Sun Undefined 640158 0.25%
4. Flared or vented greater than 1 hour
(Sup lemental report re uired -See 20 AAC 25.235 0
5. Pilot and Purge 29,411
6. Used for lease operations Fuel
Assist 5,284,068
0
7. Other Lift Gas, Off Field 0
Official Use Onl --Flavin Authorization > 1 hr.
TOTAL items 1 - 7 182,893,482 1. Safety MCF
8. NGL gas equivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 200,307,493
Commissioner Date
11. Transferred to: CGF 18,995,189
Note: All volumes must be corrected to pressure of 14.65
Remarks: psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
I hereby certi t//h~~at t foregoing ' true and correct to the best of my knowledge.
Signature: ~U. Title: SUPERVISOR Authority 20 AAC 25.235.
Form 10-422 (Fievisetl 4/95)
BP
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CCP
September-2001
PLANNED
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less SMM 1,143
Total over/under 1 Hr/5MM 1,143
PiloUPurge
Continuous Assist
29,411
0
TOTAL FLAREDNENTED 30,554
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 10/2001
Disposition Volume MCF'
1. Sold 857,047
2. Reinjected 175,425,596
3. Flared or vented less than 1 hour. 4,001
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 30,533
6. Used for lease operations Fuel
Assist 5,269,083
0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 181,586,260
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 197,655,783
11. Transferred to: CGF 17,881,285
Remarks:
I hereby certify that the foregoing is true and correct to the best of my knowledge. 1 p ,- .p,
Signature: ( ~ Title: S~-vcs.Q.. (~ _
Form 10-422 (Revisecf~4/95)
'Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
4t~ c:_
~ ~:
c .®
Official Use Onl --Flavin A orization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CCP
October-2001
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 HoudOver 5MM 0
Less 1 HR/Less 5MM 4,001
Total over/under 1 Hr/5MM 4,001
PiloUPurge 30,533
Continuous Assist 0
TOTAL FLAREDNENTED 34,534
~~Q~[~ O[~ a~Q~~Q/
Mr. Robert Reynolds
Manager, State Taxes and Royalties
BP Exploration (Alaska)
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re: October 2001 Gas Disposition Report, Central Compressor Plant
Dear Mr. Reynolds,
TONY KNOWLES, GOVERNOR
333 W. 7"' AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 2767542
December 24, 2001
The Alaska Oil and Gas Conservation Commission (AOGCC) has reviewed the BPXA Gas
Disposition submission for the Central Compressor Plant for October 2001. The AOGCC reviews
the monthly gas disposition reports to determine if the Operator is acting in accordance with good
oil field engineering practices and conservation purposes. At its discretion, the Commission will
either authorize the flaring or classify the flaring as waste.
For each Central Compressor Plant gas flaring event of less than one' hour in October 2001,
please provide the following additional information: (a) actual time(s) flaring occurred; (b) total
time flared; (c) a brief description of the activity underway or problem troubleshooting associated
with the flared volumes; and (d) a brief description of the action(s) taken to minimize the flared
gas volume.
We look forward to a written response by the end of the business day, Tuesday, January 15,
2002. Should you have any questions with respect to our information request, please contact me
at 793-1231.
Sincerely,
~~
Winton Aubert, PhD.
Petroleum Engineer
I~'~i ~ 1.^- ~r~ 1- Ct~~r ~ . c..=~' `.~ tJ ~~LM.ww t ~-'k-w -~-ce.z~.,~.! n..
1.+--~.u~*-.Q.. 'T~y.~,v~ , l..c..t.ls.ar W-~7 ~.4~~t..,e. ~,..x
~~ ti° t.E..ti. ~'a...~,~ jf. l,a r].(..Vy6r... ~ ~,~-t~-ti., wr~t,.,, ~ 1+-.-c.~K.i..
s D
~n.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 11/2001
Disposition Volume MCF*
r
1. Sold 1,635,480
2. Reinjected 219,656,551
3. Flared or vented less than 1 hour. 560
4. Flared or vented greater than 1 hour 0
(Supplemental report required -See 20 AAC 25.235)
5. Pilot and Purge 29,191
6. Used for lease operations Fuel 5,704,476
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 227,026,258
8. NGL gas equivalent produced ~;
° 0
~
9. Purchased gas ~ ~ 0
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 "e~
F
1-. 246,088,392
o .
<~ ~>
11. Transferred to: CGF
~
.
° -~
20,928,209
a
c
Remarks:
I hereby cert
i
th
at the f
o~ going is true and correct to the best of my knowledge.
f/y
~
(
~
t
~
~
Signature:;;~ j~~ t ~~~
'~ _ Title: ~Id~P ~R'o~F68R- ~~
Form 10-422 (Revised/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
Official Use Onl --Flarin Authorization > 1 hr.
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Z2
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP
CONSERVATION ORDER N0.219
GAS FLARING OR VENTING INCIDENTS
CCP
November-2001
DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 560
Total over/under i Hr/5MM 560
Pilot/Purge 29,191
Continuous Assist 0
TOTAL FLAREDNENTED 29,751
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility Operator Field(s) Month/Year of Disposition
CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 12/2001
Disposition Volume MCF*
1. Sold 1,917,108
2. Reinjected 226,387,563
3. Flared or vented less than 1 hour. 308
4. Flared or vented greater than 1 hour
(Supplemental report required -See 20 AAC 25.235) 0
5. Pilot and Purge 28,954
6. Used for lease operations Fuel
Assist 5,952,907
3,380
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 234,290,220
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 253,154,087
11. Transferred to: CGF 21,434,767
Remarks:
I hereby certi that th oregomg is true and correct to the best of my knowledge.
Signature: Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 99.75%
PBU Midnight Sun Undefined 640158 0.25%
Official Use Onl --Flarin Authorization > 1 hr:
1. Safety MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
?~ G'U
Com sinner
,.--z,~
~
Date / D Z---
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP
CONSERVATION ORDER NO. 219
DATE
TIME VOLUME MCF
GAS FLARING OR VENTING INCIDENTS
CCP
January-1904
PLANNED
DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM
Over 1 Hour/Over 5MM 0
Less 1 HR/Less 5MM 308
Total over/under 1 Hr/5MM 308
Pilot/Purge 28,954
Continuous Assist 3,380
TOTAL FLAREDNENTED 32,642