Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPHILLIPS - CCPALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT PHILLIPS ALASKA, INC. EASTERN OPERATING AREA-PBU Jan-O1 Disposition *Indicate contribution of each pool to total. 1. Sold 767,017 Pool Name Code Percent 2. Reinjected 212,986,317 PRUDHOE 640150 99.81% YwdhocRsa knit : 3. Flared or vented less than 1 hour 3,557 `~~~~~=7a~~~°" a,dc~~»a 640158 O.I9`.G 4. Flared or vented greater than 1 hour 0 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 29,520 6. Used for lease operations Fuel 5,667,602 Assist 0 7. Other 0 ................................................................ ................................................................ Official Use:Only--Fiaiiti Aukliorization >: 1:1Zr .:::::::::::::: >;: 1 ~~ TOTAL items 1 - 7 219,454,013 1. Safety . MCF 8. NGL gas equivalent produced 0 2. Lease Use " _,~/ MCF 9. Purchased gas 3. Conserv. Purposes ~`+ MCF 10. Transferred from: FS1, FS2, FS3, 240,878,805 GC1, GC2, GC3 Conunissioner Date m 11. Transferred to: CGF 23,320,718 y Note: All volumes must be corrected to = `T~ ~ Remarks: Pool Code Percentage only apply to reinjected gas ~ pressure of 14.65 psia and to a temperature of ~ v W 60 degrees. F. Report due by the 20th of the o c~ ~-"' I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. to ~ rn Authority 20 AAC 25.235. ~ 0 0 Ji f ~~,(,~ ~/ Title: SUPERVISOR Signature: Z ~3 8) o 3 C _ N Form 10-~22 (Revised ~/9~) .,~~~~~ ~ v-~~~ 0 ~~~ C~ ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CCP January-2001 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 3,557 Total over/under 1 Hr/5MM 3,557 Pilot/Purge 29,520 Continuous Assist TOTAL FLARED/VENTED 33,077 v n ~ rn .. r~ W ~ ~ ~~ o ~ ~-' ra q ~ ~ C7 ~ (~ fV _ 0 3 N. 0 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CPNTRAL COMPRESSOR PLANT PHILLIPS ALASKA INC. EASTERN OPERATING AREA-PBU Feb-O1 Disposition *Indicate contribution of each pool to total. 1. Sold 685,369 Pool Name Code Percent 2. Reinjected 194,438,343 PRUDHOE 640150 99.75% Ylvdhc,e Bay Gnit. 3. Flared or vented less than 1 hour 733 r;'d"'~~'~ `°" UndeP~ned 640158 0.25~'v '' 4. Flared or vented greater than 1 hour 0 (Supplemental report required--See 20 AAC 25.235) 5. Pilot and Purge 26,814 6. Used for lease operations Fuel 5,081,351 Assist 0 7. Other 0 .. .. Offi.caTiJse:Orily==~iaiin ~Atitliori~aiion> l:hr .:::::::::::::::~:" TOTAL items 1 - 7 200,232.,610 1. Safety ~.--~-""NICF :~- . f~ °. ' ~ ° 8. NGL gas equivalent produced 0 2. Lease Use :~ ,f MCF °` f " ,, 9. Purchased gas 3. Conserv. Purposes /,= `^ MCF 10. Transferred from: FS1, FS2, FS3, 218,729,182 GC1, GC2, GC3 Commissioner Date 11. Transferred to: CGF 20,306,622 Note: All volumes must be corrected to Remarks: Pool Code Percentage only apply to reinjected gas pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. Authority 20 AAC 25.235. r ;~,,~,1,../ Title: SUPERVISOR Signature: ~'~ e~ , Forni 10- 22 ( evised /9 ) ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CCP February-2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 733 Total over/under 1 Hr/5MM 733 Pilot/Purge Continuous Assist 26,814 TOTAL FLARED/VENTED 27,547 '" ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL COMPRESSOR PLANT Operator PHILLIPS ALASKA, INC. Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition Mar-O1 Disposition *Indicate contribution of each pool to total. 1. Sold 789,600 Pool Name Code Percent 2. Reinjected 228,987,643 PRUDHOE 640150 99.75% 3. Flared or vented less than 1 hour 0 Prudhoe Bsy° IInii ~~~~,;"t~~ ~t'" t~„d~r~~~d 640158 02~`,~~ 4. Flared or vented greater than 1 hour (Supplemental report required--See 20 AAC 25.235) 0 5. Pilot and Purge 30,245 6. Used for lease operations Fuel Assist 5,928,218 0 7.Other 0 ................................................................ ................................................................ Offi~ialUse:Only=;Fiariii Autliorizatioi[ > 1:~ir.::: ;:::::: ;;::::: TOTAL items 1 - 7 235,735,706 1. Safety 'MCF j .i 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 3. Conserv. Purposes / MCF f 10. Transferred from: FS1, FS2, FS3, GCl, GC2, GC3 257,220,262 Commissioner Date 11. Transferred to: CGF 23,655,209 Note: All volumes must be corrected to Remarks: Pool Code Percentage only apply to reinjected gas pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. e~ ~ ~ / r /' ~ ~~ ~~ ~ Signature: ~~r 1~~,tTjY~p ! " U~-~d`'„`~~~ Title: SUPERVISOR month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Devised ~%9~) v~~~V~ ~V-~~~ PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CCP March-2001 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 0 Total over/under 1 Hr/5MM 0 Pilot/Purge 30,245 Continuous Assist TOTAL FLARED/VENTED 30,245 PBU PRODUCER'S REPORT OF GAS DISPOSITION Alaska Oil & Gas Conservation Comm Exxon Company USA Forest Oil Corp. Attn: Ms. Wendy Mahan Joint interest Acctg. Attn: Nancy Reinhardt 3001 Porcupine Drive Tracie Hutzler, Rm 1419-L 1600 Broadway., Suite 2200 Anchorage, Alaska 99501 P. O. Box 4707 Denver CO 80202 Houston, Texas 77210 Chevron U.S.A., Inc. Attn: NOVJ Manager P. O. Box 36366 Houston, Texas 77236 Chevron USA, Inc. Attn: Virgil Reyes P. O. Box J, Section 981 Concord, California 94524 BP Exploration, Inc. Attn: Dianna Sommer MB7-2 P. O. Box 196612 Anchorage, Alaska 99519-6612 Jeff Morvant PD 807 State of Alaska Oil and Gas Audit Division 550 W 7th Avenue, Suite 570 Anchorage, Alaska 99501-3557 Exxon Company USA Attn: Prudhoe Bay 91-0250 Topping Plant Houston, Texas 77210-4496 Phillips Petroleum Company Attn: Ms. Carol Kulchinski 1380 Plaza Office Bldg Bartlesville, Oklahoma 74004 Davis/Deveau - PRB 6 Eliana Uribe Dept of Natural Resources Royalty Section 550 W. 7'h Avenue, Suite 800 Anchorage, AK 99501 BP Exploration, Inc. Attn: Mr. Gary Benson P. O. Box 196612 Anchorage, Alaska 99519-6612 ~~ ~~,~ ~ ~. 2a~~ ~`.t*1hh;~ ljii ~~ ~` ~~ ~:_:a~S. I,iGCl~~1i$[Q[`'• !g,=:iliG~~~+~ a ~; ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 04/2001 Disposition Volume MCF* 1. Sold 738,193 2. Reinjected 204,266,836 3. Flared or vented less than 1 hour. 408 4. Flared or vented greater than 1 hour (Sup lemental report re uired -See 20 AAC 25.235) 0 5. Pilot and Purge 29,521 6. Used for lease operations Fuel Assist 5,387,243 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 210,422,201 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 229,122,840 11. Transferred to: CGF 21,045,314 Remarks: I hereby cent' a the regoing is t~.ae and correct to the best of my knowledge. Signature: ,. ,f,~_ Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 99.75% PBU Midnight Sun Undefined 640158 0.25% OfficialUse Only--Flavin Authorization > 1 hr. n~~ _-.; . 1. Safety f J~,,~~' MCF ,' 2. Lease Use ~~ MCF 3. Consenr. Purposes ~ MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CCP April-2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 408 Total over/under 1 Hr/5MM 408 Pilot/Purge Continuous Assist 29,521 0 TOTAL FLARED/VENTED 29,929 ..~... ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 05/2001 Disposition Volume MCF' 1. Sold 728,559 2. Reinjected 196,785,839 3. Flared or vented less than 1 hour. 5,407 4. Flared or vented greater than 1 hour (Su lemental re ort required -See 20 AAC 25.235) 0 5. Pilot and Purge 30,284 6. Used for lease operations Fuel Assist 5,183,563 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 202,733,652 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 222,193,356 11. Transferred to: CGF 21,293,358 Remarks: I hereby certi that t e foregoing is true and correct to the best of my knowledge. Signature: Title: SUPERVISOR 'Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 99.75% PBU Midnight Sun Undefined 640158 0.25% Official Use Only--Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use ~ ~~~ MCF -~ 3. Conserv. Purposes ~~ MGF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CCP May-2001 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over SMM 0 Less 1 HR/Less 5MM 5,407 Total over/under 1 Hr/5MM 5,407 Pilot/Purge 30,284 Continuous Assist 0 TOTAL FLARED/VENTED 35,691 bP BP Exploration (Alaska) Inc. 900 East Benson Boulevard P. O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 June 11, 2001 To: Recipients of the PBU Producer's Report of Gas Disposition Enclosed is the May 2001 PBU Producer's Report of Gas Disposition. If you have any questions about this report, please contact Gary Benson at (907) 564-4604. Sincerely, n, ~~L- Robert A. Reynolds Manager, State Taxes and Royalty ~' Enclosure ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 06/2001 Disposition Volume MCF" 1. Sold 669,775 2. Reinjected 186,449,810 3. Flared or vented less than 1 hour. 298 4. Flared or vented greater than 1 hour Su lemental re ort required -See 20 AAC 25.235) 0 5. Pilot and Purge 29,392 6. Used for lease operations Fuel Assist 5,205,688 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 192,354,963 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 209,918,046 11. Transferred to: CGF 19,242,608 Remarks: I hereby ce that th foregoing is true and correct to the best of my knowledge. Signature: Title: SUPERVISOR 'Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 99.75% PBU Midnight Sun Undefined 640158 0.25% .Official Use Only--Flarin Authorization > i hr, 1. Safety CF 2. Lease Use ~ MCF 3. Conserv. Purposes ~ ~ ~ MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) BP CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CCP June-2001 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 298 Total over/under 1 Hr/5MM 298 Pilot/Purge 29,392 Continuous Assist 0 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE TOTAL FLARED/VENTED 29,690 '"' 4 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 07/2001 Disposition Volume MCF' 1. Sold 653,153 2. Reinjected 187,503,120 3. Flared or vented less than 1 hour. 2,427 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 0 5. Pilot and Purge 30,298 6. Used for lease operations Fuel Assist 5,474,670 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 193,663,668 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 210,083,933 11. Transferred to: CGF 18,199,136 Remarks: I hereby certi th t the oregoing is true and correct to the best of my knowledge. Signature: Title: SUPERVISOR `Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 99.75% PBU Midnight Sun Undefined 640158 0.25% Official Use Only--Flarin ;,Authorization.> 1 hr. 1. Safety ~ ~~ CF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 Asia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) BP CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CCP July-2001 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 2,427 Total over/under 1 Hr/5MM 2,427 PiloUPurge 30,298 Continuous Assist 0 TOTAL FLAREDNENTED 32,725 by BP Exploration (Alaska) Inc. 900 East Benson Boulevard P. O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 10, 2001 To: Recipients of the PBU Producer's Report of Gas Disposition Enclosed is the July 2001 PBU Producer's Report of Gas Disposition. If you have any questions about this report, please contact Gary Benson at (907) 564-4604. Sincerely, Q. Robert A. Reynolds Manager, State Taxes and Royalty Enclosure RECEIVED AUG 15 2001 Alaska Oil & Gas Cons. Commission Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 08/2001 Disposition Volume MCF' 1. Sold 660,050 2. Reinjected 193,298,611 3. Flared or vented less than 1 hour. 642 4. Flared or vented greater than 1 hour 0 Supplemental report re aired -See 20 AAC 25.235) 5. Pilot and Purge 30,357 6. Used for lease operations Fuel 5,355,490 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 199,345,150 8. NGL gas equivalent produced ~ 0 N 9. Purchased gas sx ~ 0 ~ ~ 10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 ,n ~ oo 217,168,410 ~. C7 N 11. Transferred to: CGF N~ o s 19,588,130 Remarks: I hereby certi that t foregoin is true and correct to the best of my knowledge. Signature: Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 99.75% PBU Midnight Sun Undefined 640158 0.25% Official Use Onl --Flarin Authorization > 1 hr: 1. Safety CF 2. Lease Use ~ MCF J'/ 3. Conserv. Purposes ~ MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CCP August-2001 .,.T~ T~e~c vni i inns luc~ nFSCRIPTION CF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 642 Total over/under 1 Hr/5MM 642 PiloUPurge 30,357 Continuous Assist 0 TOTAL FLAREDNENTED 30,999 ALASKA OIL AND GAS CONSERVATION COMMISSION ~ecn iTV RFpnRT nF PRODUCED GAS DISPOSITION Facility CENTRAL COMPRESSOR PLANT Operator BP EXPLORATION, ALASKA Field(s) EASTERN OPERATING AREA-PBU Month/Year of Disposition 09/2001 Disposition Volume MCF* 'Indicate contribution of each pool to total. 1. Sold 623,399 Pool Name Code Percent 2. Reinjected 176,955,461 PRUDHOE 640150 99.75% 3. Flared or vented less than 1 hour. 1,143 PBU Midnight Sun Undefined 640158 0.25% 4. Flared or vented greater than 1 hour (Sup lemental report re uired -See 20 AAC 25.235 0 5. Pilot and Purge 29,411 6. Used for lease operations Fuel Assist 5,284,068 0 7. Other Lift Gas, Off Field 0 Official Use Onl --Flavin Authorization > 1 hr. TOTAL items 1 - 7 182,893,482 1. Safety MCF 8. NGL gas equivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 200,307,493 Commissioner Date 11. Transferred to: CGF 18,995,189 Note: All volumes must be corrected to pressure of 14.65 Remarks: psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. I hereby certi t//h~~at t foregoing ' true and correct to the best of my knowledge. Signature: ~U. Title: SUPERVISOR Authority 20 AAC 25.235. Form 10-422 (Fievisetl 4/95) BP CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CCP September-2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less SMM 1,143 Total over/under 1 Hr/5MM 1,143 PiloUPurge Continuous Assist 29,411 0 TOTAL FLAREDNENTED 30,554 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 10/2001 Disposition Volume MCF' 1. Sold 857,047 2. Reinjected 175,425,596 3. Flared or vented less than 1 hour. 4,001 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 0 5. Pilot and Purge 30,533 6. Used for lease operations Fuel Assist 5,269,083 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 181,586,260 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 197,655,783 11. Transferred to: CGF 17,881,285 Remarks: I hereby certify that the foregoing is true and correct to the best of my knowledge. 1 p ,- .p, Signature: ( ~ Title: S~-vcs.Q.. (~ _ Form 10-422 (Revisecf~4/95) 'Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 99.75% PBU Midnight Sun Undefined 640158 0.25% 4t~ c:_ ~ ~: c .® Official Use Onl --Flavin A orization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CCP October-2001 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 HoudOver 5MM 0 Less 1 HR/Less 5MM 4,001 Total over/under 1 Hr/5MM 4,001 PiloUPurge 30,533 Continuous Assist 0 TOTAL FLAREDNENTED 34,534 ~~Q~[~ O[~ a~Q~~Q/ Mr. Robert Reynolds Manager, State Taxes and Royalties BP Exploration (Alaska) P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: October 2001 Gas Disposition Report, Central Compressor Plant Dear Mr. Reynolds, TONY KNOWLES, GOVERNOR 333 W. 7"' AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 2767542 December 24, 2001 The Alaska Oil and Gas Conservation Commission (AOGCC) has reviewed the BPXA Gas Disposition submission for the Central Compressor Plant for October 2001. The AOGCC reviews the monthly gas disposition reports to determine if the Operator is acting in accordance with good oil field engineering practices and conservation purposes. At its discretion, the Commission will either authorize the flaring or classify the flaring as waste. For each Central Compressor Plant gas flaring event of less than one' hour in October 2001, please provide the following additional information: (a) actual time(s) flaring occurred; (b) total time flared; (c) a brief description of the activity underway or problem troubleshooting associated with the flared volumes; and (d) a brief description of the action(s) taken to minimize the flared gas volume. We look forward to a written response by the end of the business day, Tuesday, January 15, 2002. Should you have any questions with respect to our information request, please contact me at 793-1231. Sincerely, ~~ Winton Aubert, PhD. Petroleum Engineer I~'~i ~ 1.^- ~r~ 1- Ct~~r ~ . c..=~' `.~ tJ ~~LM.ww t ~-'k-w -~-ce.z~.,~.! n.. 1.+--~.u~*-.Q.. 'T~y.~,v~ , l..c..t.ls.ar W-~7 ~.4~~t..,e. ~,..x ~~ ti° t.E..ti. ~'a...~,~ jf. l,a r].(..Vy6r... ~ ~,~-t~-ti., wr~t,.,, ~ 1+-.-c.~K.i.. s D ~n. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 11/2001 Disposition Volume MCF* r 1. Sold 1,635,480 2. Reinjected 219,656,551 3. Flared or vented less than 1 hour. 560 4. Flared or vented greater than 1 hour 0 (Supplemental report required -See 20 AAC 25.235) 5. Pilot and Purge 29,191 6. Used for lease operations Fuel 5,704,476 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 227,026,258 8. NGL gas equivalent produced ~; ° 0 ~ 9. Purchased gas ~ ~ 0 10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 "e~ F 1-. 246,088,392 o . <~ ~> 11. Transferred to: CGF ~ . ° -~ 20,928,209 a c Remarks: I hereby cert i th at the f o~ going is true and correct to the best of my knowledge. f/y ~ ( ~ t ~ ~ Signature:;;~ j~~ t ~~~ '~ _ Title: ~Id~P ~R'o~F68R- ~~ Form 10-422 (Revised/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 99.75% PBU Midnight Sun Undefined 640158 0.25% Official Use Onl --Flarin Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Z2 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CCP November-2001 DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 560 Total over/under i Hr/5MM 560 Pilot/Purge 29,191 Continuous Assist 0 TOTAL FLAREDNENTED 29,751 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL COMPRESSOR PLANT BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 12/2001 Disposition Volume MCF* 1. Sold 1,917,108 2. Reinjected 226,387,563 3. Flared or vented less than 1 hour. 308 4. Flared or vented greater than 1 hour (Supplemental report required -See 20 AAC 25.235) 0 5. Pilot and Purge 28,954 6. Used for lease operations Fuel Assist 5,952,907 3,380 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 234,290,220 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: FS1, FS2, FS3, GC1, GC2, GC3 253,154,087 11. Transferred to: CGF 21,434,767 Remarks: I hereby certi that th oregomg is true and correct to the best of my knowledge. Signature: Title: SUPERVISOR Form 10-422 (Revised 4/95) *Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 99.75% PBU Midnight Sun Undefined 640158 0.25% Official Use Onl --Flarin Authorization > 1 hr: 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ?~ G'U Com sinner ,.--z,~ ~ Date / D Z--- Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP CONSERVATION ORDER NO. 219 DATE TIME VOLUME MCF GAS FLARING OR VENTING INCIDENTS CCP January-1904 PLANNED DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR and/or GREATER THAN 5MM Over 1 Hour/Over 5MM 0 Less 1 HR/Less 5MM 308 Total over/under 1 Hr/5MM 308 Pilot/Purge 28,954 Continuous Assist 3,380 TOTAL FLAREDNENTED 32,642