Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPHILLIPS - CPF #2ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION CENTRAL PROCESSINGFACILITY #2 ~ PHII.LIPS ALASKA, INC. ~ KUPARU Disposifion Volume MCF* 1. Sold 175,200 2. Reinjected 4,795,294 3. Flared or vented less than 1 hour 13,389 4. Flared or vented greater than 1 hour Su lemental r ort r iced--See 20 AAC 25.235 2,414 5. Pilot and Purge 16,974 6. Used for lease operations Fuel 595,401 0 7.Other 0 TOTAL items 1- 7 5,598,672 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from PBU CGF (LSEOR NGLS) CPFl 868,733 1,219,122 11. Transferred to: 0 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected online 10 or Naptha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature:. ~~~~ ~- Title: Supervisor Date: 02/13/01 Month/Year of Disposition K RIVER UNIT 1/Ol *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 86.79% KUPARUK RIVER UNIT TABASCO 490160 0.17% KUPARUK RIVER UNIT TARN 490165 13.04% Official Use Only--Flaring Authorization > 1 hr. 1. Safety ) V ~ ~ f MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Y'~1i Commissi er ,'Zo%.r Date Note: All volumes mast be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Q a R° ~'~- J ~ f.., %~,. ti Form 10-422 (Revised 4/95) ~ 4 y O PHILLIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 January 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 1 /7/01 1533 - .1700 509 Gas transit system overpressure backing CPF/Flow Station unplanned Reduced inlet gas rates. out, excessive inlet gas rates into facility, high ambient S/I 2 wells for a total of 14/7 MMSCFD gas and 3663 temperatures, and rapid rise in ambient temperature bbis oil. resulting in phase 3 conditions 1 /7/Ol 2252 -0002 362 Excessive inlet gas rates into facility, high ambient unplanned Reduced inlet gas rates temperatures, and phase 3 weather conditions could not to drill sites to S/I wells, S/I wells @ 2N pad. 1 /15/01 1902 - 2026 836 Excessive inlet gas rates into facility, high ambient unplanned Reduced inlet gas rates temperatures, ambient temperatures rise with change in wind, LG compressors bogged down ,cut inlet rates 1 /28/01 0739 - 0858 .546 Facility maintenance unplanned Compressor depressurized, reduced inlet gas rates. 1 /29/01 1402 - 1520 161 NGL scrubber dumps froze sending NGLs to front end unplanned Started methanol pump and open bypass valves on of processor level valves. TOTAL OVER 1 HOUR 2,414 PLANNED EVENTS LESS THAN 1 HOUR 0 ~. y 7C 4 ~ Flare or Vent Volumes: -r~ ttt~~ www Greater than 1 hour #han 1 hour Le 2,414 13 389 ~ ~ W ss , Continuous Assisi 0 ~ ~ ~ ~'-' Pilot and Purge 16.97d rn ~ `~ o r~.r ~' TOTAL FLARED/VENTED 32,777 3 c '-"i 4i ti O ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/I'ear of Disposition nCAI'1`TJ AT DT711!'~000TATl1FAf Tf TTV ~f7 PNTTT TPC AI ASKA INC KUPARUKRIVEI2UNIT 2/01 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 24,555 Pool Name Code Percent 2. Reinjected 4,275,449 KUPARUK RIVER UNIT 490100 87.00% 3. Flared or vented less than 1 hour 6,531 KUPARUK RIVER UNIT TABASCO 490160 0.18% 4. Plared or vented greater than 1 hour 8,386 KUPARUK RIVER UNIT TARN 490165 12.82% Su lemental r oTt r uired--See 20 AAC 25.235 5. Pilot and Puree 12,474 6. Used for lease operations Fnel 675,779 ist 7.Other 0 Official Use Onl --Flaring Authorization > 1 hr. TOTAL items 1- 7 5,003,174 1. Safety ~S `~ ~~ MCF $. NGL Qas equivalentvroduced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF .,r ~ u' ° '~ 10. Transferred from: PBU CGF (LSEOR NGLSI 855,093 CPFl 1,436,993 Commis ' ner Date 0 11. Transferred to: Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR pressure of 14.65 psis and to a temperature of reflected on line 10 or Napdta used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is hue and correct to the best of my knowledge. month following die month of disposition Authority 20 AAC 25.235. 03/13/01 t D "~ Q % ~~ a e: Title: Supervisor - -~ -Y - Signature: R'~t~~µl7YmLj~ 'y "' ~V" ~~~~Ox- Form 10-422 (Revised 4/95 PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #2 February 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 2/15/01 1722 - 1900 8,386. Electrical /Instrumentation malfunction unplanned Corrected E&I fluctuations /failure "B" recap motor shorted causing power surge. Shut down Stabilized facilty process and operation shipping pumps OSD'd facility. Flared gas on facility Restarted facility restart. NOTE: Upset occurred during adverse blizzard conditions. TOTAL OVER 1 HOUR 8,386 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Venf Volumes: Greater than 1 hour 8,386 Less than 1 hour 6,531 Continuous Assist 0 Pilot and Purge ]2,424 TOTAL FLARED/VENTED 27,391 .~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL PROCESSINOFACII.ITY#2 PHILLIl'SALASKA,INC. KUPARUKRIVERUNIT 3/01 Disposition Volume MCF* 1. Sold 38,142 2. Reinjected 4,907,851 3. Flared or vented less than 1 hour 5,370 4. Flared or vented greater than 1 hour Su lemental r rt r uired--See 20 AAC 25.235 0 5. Pilot and Purge 16,788 6. Used for lease operations Feel 't 668,161 0 7. other 0 TOTAL items 1- 7 5,636,312 8. NGL ¢as equivalentproduced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) CPFl 984,768 1,679,129 11. Transferred to: 0 Remarks: Reinjected vol does notinclude volumes of PBU NGLS squired for LSEOR reflected on line 10 or Na tha used in SSEOR meter #201 I hereby certify t the f going is true and correct to the best of my knowledge. Signs ~ Title: Supervisor Date: 04/13/01 *Indicate contribution of each pool to total Pool Name Code Percent KUPARUK RIVER UNIT 490100 85.80% KUPARUKRIVERUNITTABASCO 490160 0.14% KUPARUK RIVER UNIT TARN 490165 14.06% Official Use Onl --Flaring Authorization > 1 hr. 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposifion. Authority 20 AAC 25.235. ~pv Form 10-422 evised 4/95) PHILLIPS ALASKA, INC. _ ~ ~ CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #2 March 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR NO DATA TO REPORT TOTAL OVER 1 HOUR 0 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than i hour 0 Less than 1 hour 5,370 Continuous Assist 0 Pilot and Purge 16.Z$.8 TOTAL FLARED/VENTED 22,158 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ~CENTRALPROCESSINGFACILITY#2 ~ PHII.LIPSALASKA,INC. ~ KUPARU Disposition Volume MCF* 1. Sold 26.744 2. Reinjected 4,481,444 3. Flared or vented less than 1 hour 2,652 4. Flared or vented greater than 1 hour Su lemental re ort r uired--See 20 AAC 25.235 249 5. Pilot and Pure 15,654 6. Used for lease operations Fuel ssi t 699,979 0 7.Other 0 TOTAL items 1- 7 5,226,722 8. NGL eas equivalentpmduced 0 9. Purchased gas 0 10. Transferred from PBU CGF (LSEOR NGLS) CPFl 863,525 1,592,910 11. Transferred to: 0 Remarks: Reinjected vol does notinclude volumes of PBU NGLS aquired for LSEOR reflected online 10 or Na tha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signatureg~fy, i~~Lsq ~~ Title: Supervisor Date: OS/15/Ol Form 10-422 (Revised 4/95) UNIT ear of Disposition 4/01 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 86.67% KUPARUK RIVER UNIT TABASCO 490160 0.14% KUPARUK RIVER UNIT TARN 490165 13.19% Official Use Only--Flaring Authorization > 1 hr. 1. Safety ~ ~ ~ MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ^Y ~ Commissi er 9 ~ Q Date Note: All volumes must be corrected to pressure of 14,65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. ~J ~~ `~ /~ ~j/f!/try • PHILLIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 APRIL 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 4/16/01 1638- 1750 TOTAL OVER 1 HOUR 249 ELECTRICAL / INSTRUMATION MALFUNCTION UNPLANNED CORRECTED E&I FLUCTUATION /FAILURE REPAIRED EQUIPMENT DIFFICULTIES WITH BREAKER DC FIELD 249 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour 249 Less than 1 hour 2,652 Continuous Assist 0 Pilot and Purge 15.654 • TOTAL FLARED/VENTED 18,555 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/I'ear of Disposition CENTRAL PROCESSING FACII.ITY #2 PHILLIPS ALASKA, INC. KUPARUK RIVER UNTT Disposition Volume MCF* *Indicate contribution of each pool to total 1. Sold 26,898 Pool Name 2. Reinjected 4,436,196 KUPARUKRIVERUNIT 3. Flared or vented less than l hour 5,216 KUPARUK RIVER UNIT TABASCO 4. Flared or vented greater than 1 hour 8,943 KUPARUK RIVER UNIT TARN (Suoulementalreoortreauired--See 20 AAC 25.2351 5. Pilot and Puree 16,573 6. Used for lease operations Fuel 704,357 sist 0 7.Other 0 TOTAL items 1- 7 5,198,183 8. NGL eas equivalentproduced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 826,910 CPFl 1,701,268 11. Transferred to: 0 Remarks: Reinjected vol does notinclude volumes of PBU NGLS squired for LSEOR reflected on line 10 or Na tha used in SSEOR meter #201 I hereby certify t the going is true and correct to the best of my knowledge. Signs Title: Supervisor Date: 06/15/01 Code 490100 490160 490165 Percent 86.21% 0.15% 13.61% Official Use Only--Flarin Authorization > 1 hr. 1. Safety ~ Cjy'3 P~CF 2. Lease Use A~CF 3. Conserv. Purposes 1dCF ~ ,yam Commissi er ~ s ~- Date Note: All volumes must be wrrected to ` pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. 5/Ol J` Form 10-422 (Revised 4/95) PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.214 GAS FLARING OR VENTING INCIDENTS CPF #2 MAY 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 5/29/01 20:00 - 0347 8,503 5/30/01 05:07 - 06:14 440 PROCESS UPSET IN C-GLC TRIP SECTION OF FACILITY GLC - C S/D ON HIGH VIBRATION HIGH AMBIENT TEMPERATURES UNPLANNED COMPRESSOR /TRAIN DEPRESSURIZED REDUCED INLET GAS RATES REPAIRED TURBINES AND RESTARTED UNPLANNED REDUCED INLET GAS RATES TOTAL OVER 1 HOUR 8,943 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour 8,943 Less than 1 hour 5,216 Continuous Assisi 0 Pilot and Purge 16.573 TOTAL FLARED/VENTED 30,732 5/29 and 5/30 CPF-2 Unplanned Flare Events Subject: 5/29 and 5/30 CPF-2 Unplanned Flare Events Date: Fri, 8 Jun 2001 13:21:57 -0800 From: "Lisa Pekich" <lpekich@ppco.com> To: wendy_mahan@admin.state.ak.us Oops--forgot to correct your email address! ! Hope you get this one. -Lisa ----- Forwarded by Lisa Pekich/PPCO on 06/08/01 01:23 PM ----- Lisa Pekich 06/08/01 01:20 PM To: Wendy Mahan cc: CPF2 Prod Supv/PPCO@Phillips, NSK Env Proj/PPCO@Phillips, NSK Env Coord/PPCO@Phillips, Ken L Donajkowski/PPCO@Phillips, William W Patterson/PPCO@Phillips, Tom Wellman/PPCO@Phillips, W R Randy Poteet/PPCO@Phillips, Steve Findlay/PPCO@Phillips Subject: 5/29 and 5/30 CPF-2 Unplanned Flare Events Wendy, As we discussed yesterday, CPF-2 had two unplanned flare events at the end of May. Here is some additional information to support the written report that will be submitted with the 10-422 form: May 29, 2001 Beginning 2000 hrs on 05/29 CPF2 experienced a single flare event of 317 minutes and a total of 8.5 MMSCF. No black smoke was observed during the event. The event was precipitated by a unplanned shutdown of the C GLC due to a vibration shutdown. Restart of the machine could not take place immediately due to the need to replace a failed 2" automatic purge valve that is required for the startup sequence. The board operator began reducing inlet gas rates through a combination of choke adjustments and shut in wells. The rate of flare was reduced significantly by the above actions ~50-55 MMSCFD reduction) over the course of the event, but was not eliminated. Restart of the turbine took longer than on site personnel initially suspected, due primarily to problems isolating for the valve replacement, but also due to a decision made later to cold wash the unit while it was shut down. It was suspected at the time that a dirty turbine may have contributed to the initial shutdown of the unit justifying the cold wash. 6/8/01 1:39 PM 1 of 2 5/29 and 5/3Q CPF-2 Unplanned Flare Events The unit was restarted at ~ 0330 which eliminated the flare. May 30, 2001 Beginning 0507 on 5/30 another flare event of 67 minutes occurred and a total of 0.4 MMSCF. No black smoke was observed The event primarily occurred due to change in compressor capacity due to ambient temperature and wind effects on turbine inlet air temperatures. The flare was eliminated through board operator actions, but not until the reporting threshold of 1 hour was passed. To confirm our conversation, it may be a few months before you get to reviewing the details of these events and this information will be kept with the file to provide additional information for your review. If you have questions regarding these events, please contact the CPF-2 Production Supervisors (Steve Bradley/Glynn Jones) at 659-7502. Also, as you requested, if you ever have questions regarding flare event reports from Kuparuk, please contact the Facility Supervisors (see below) for additional information or you can always contact the Kuparuk Field Environmental Dept at 659-7242. CPF-1: Carey Farmer/Warren Dobson 659-7727 CPF-2: Steve Bradley/Glynn Jones 659-7502 CPF-3: Lindsey Clark/John Hentges 659-7682 Thanks and have a great weekend. -Lisa 6/8/01 1:39 PM 2of2 5/29 and 5/30 CPF-2 Unplanned Flare Events Subject: 5129 and 5/30 CPF-2 Unplanned Flare Events Date: Fri, 8 Jun 2001 13:21:57 -0800 From: "Lisa Pekich" <lpekich@ppco.com> To: wendy_mahan@admin.state.ak.us Oops--forgot to correct your email address! !Hope you get this one. -Lisa ----- Forwarded by Lisa Pekich/PPCO on 06/08/01 01:23 PM ----- Lisa Pekich 06/08/01 01:20 PM To: Wendy Mahan cc: CPF2 Prod Supv/PPCO@Phillips, NSK Env Proj/PPCO@Phillips, NSK Env Coord/PPCO@Phillips, Ken L Donajkowski/PPCO@Phillips, William W Patterson/PPCO@Phillips, Tom Wellman/PPCO@Phillips, W R Randy Poteet/PPCO@Phillips, Steve Findlay/PPCO@Phillips Subject: 5/29 and 5/30 CPF-2 Unplanned Flare Events Wendy, As we discussed yesterday, CPF-2 had two unplanned flare events at the end of May. Here is some additional information to support the written report that will be submitted with the 10-422 form: May 29, 2001 Beginning 2000 hrs on 05/29 CPF2 experienced a single flare event of 317 minutes and a total of 8.5 MMSCF. No black smoke was observed during the event. The event was precipitated by a unplanned shutdown of the C GLC due to a vibration shutdown. Restart of the machine could not take place immediately due to the need to replace a failed 2" automatic purge valve that is required for the startup sequence. The board operator began reducing inlet gas rates through a combination of choke adjustments and shut in wells. The rate of flare was reduced significantly by the above actions ~50-55 MMSCFD reduction) over the course of the event, but was not eliminated. Restart of the turbine took longer than on site personnel initially suspected, due primarily to problems isolating for the valve replacement, but also due to a decision made later to cold wash the unit while it was shut down. It was suspected at the time that a dirty turbine may have contributed to the initial shutdown of the unit justifying the cold wash. 1 of 2 7/12/01 9:38 AM 5129 and 5/30 CPF-2 Unplanned Flare Events The unit was restarted at ~ 0330 which eliminated the flare. May 30, 2001 Beginning 0507 on 5/30 another flare event of 67 minutes occurred and a total of 0.4 MMSCF. No black smoke was observed The event primarily occurred due to change in compressor capacity due to ambient temperature and wind effects on turbine inlet air temperatures. The flare was eliminated through board operator actions, but not until the reporting threshold of 1 hour was passed. To confirm our conversation, it may be a few months before you get to reviewing the details of these events and this information will be kept with the file to provide additional information for your review. If you have questions regarding these events, please contact the CPF-2 Production Supervisors (Steve Bradley/Glynn Jones) at 659-7502. Also, as you requested, if you ever have questions regarding flare event reports from Kuparuk, please contact the Facility Supervisors (see below) for additional information or you can always contact the Kuparuk Field Environmental Dept at 659-7242. CPF-1: Carey Farmer/Warren Dobson 659-7727 CPF-2: Steve Bradley/Glynn Jones 659-7502 CPF-3: Lindsey Clark/John Hentges 659-7682 Thanks and have a great weekend. -Lisa 2 of 2 7/12/01 9:38 AM ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facili}~~ rnrrn nr vnnrcccinif` FAr`TT TTV #~ Operator PHTT T TPS ALASKA INC Field(s) KUPARUKRIVERUNIT Month/Year of Disposition 6/01 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 25,765 Pool Name Code Percent 2. Reinjected 3,955,362 KUPARUK RIVER UNIT 490100 85.49% 3. Flared or vented less than 1 hour 7,692 KUPARUK RIVER UNIT TABASCO 490160 0.19% 4. Flared or vented greater than 1 hour Su lemental re ort re uired--See 20 AAC 25.235 5. Pilot and Purge 983 15,534 KUPARUK RIVER UNIT TARN 490165 14.32% 6. Used for lease operations Fuel ssi t 643,954 0 7.Other 0 Official Use Only--Flaring Authorization > 1 hr. TOTAL items 1- 7 4,649,290 1. Safety 7~ (o c ~ MCF 8. NGL gas equivalentpmduced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU CGF (LSEOR NGLS) CPFl 792,664 1,727,148 ~ '~ ~~ lam. ~ ~ Date ' er Commis 0 11. Transferred to: Note: All volumes must be corrected to f Remarks: Reinjected vol does notinclude volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 pressure of 14.65 psis and to a temperature o 60 degrees F. Report due by the 20th of the osition f di th I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: Title: Supervisor Date: 07/16/01 . sp o month following the mon Authority 20 AAC 25.235. ~N Form 10-422 (Revised 4/95) PHILLIPS ALASKA, INC. • CONSERVATION ORDER N0.219 • GAS FLARING OR VENTING INCIDENTS CPF #2 June 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 6/18/01 Ol :O1-02:10 250 HIGH AMBIENT TEMPERATURES 6/4/01 11:31-12:48 421 EXCESSIVE INLET GAS HIGH AMBIENT TEMPERATURES 6/10/01 12:17-13:18 312 HIGH AMBIENT TEMPERATURES TOTAL OVER 1 HOUR 983 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour 983 Less than 1 hour 7,692 Continuous Assist 0 Pilot and Purge ~~ UNPLANNED REDUCED INLET GAS RATES UNPLANNED REDUCED INLET GAS RATES UNPLANNED REDUCED INLET GAS RATES ,~ TOTAL FLARED/VENTED 24,209 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition CENTRAL PROCESSING FACILITY #2 PHILLIPS ALASKA, INC. KUPARUK RIVER UNIT 7/01 Disposition Volume MCF* 1. Sold 27,385 2. Reinjected 3,882,140 3. Flared or vented less than 1 hour 8,635 4. Flared or vented greater than 1 hour Su lemental re or[ r uired--See 20 AAC 25.235 2,056 5. Pilot and Purf'e 16,782 6. Used for lease operations Fuel ssis 717,100 0 7.Other 0 TOTAL items 1 - 7 4,654,098 8. NGL eas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) CPFl 787,707 1,554,371 11. Transferred to: 0 Remarks: Reinjected vol does notinclude volumes of PBU NGLS squired for LSEOR reflected on line 10 or Na tha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature: Title: Supervisor Date: 08/16/01 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 84.92% KUPARUK RIVER UNIT TABASCO 490160 0.20% KUPARUK RIVER UNIT TARN 490165 14.88% Official Use Only--Flaring Authorization > 1 hr. 1. Safety ~' /_ 3S"- MCP 4 2. Lease Use a MCF onserv. Purposes 3. C MCF ` l.Gt;• _ 1 ?fie A :Y Commissi er Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Vii. Form 10-422 (Revised 4/y~) PHILLIFS ALASKA, IPdC • ^x , ~ -,. .~,,. ' t ~".::;'i if ,.41 ,r~~i J~~« °~.MA.~':t~C1\~ ~}~~~1~ .e. ..,: GAS FLARING OR VENTING INCIDENTS CPF #2 July 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 7/16/01 00:19-01:36 1,892 Process upset in Gas section of Facility Faulty shutdown of B GLC 7/22/01 10:05-11:09 164 Excessive inlet gas rates in facility High Ambient temperatures Rapid ambient rise following morning log burn off TOTAL OVER 1 HOUR 2,056 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greoter than 1 hour 2,056 Less than 1 hour 8,635 Continuous Assisi 0 Pilot and Purge 16.782 UNPLANNED Reduced inlet gas rates. Shut in 27 wells to eliminate flare UNPLANNED Reduced inlet gas rates. Shut in 5 wells to eliminate flare TOTAL FLARED/VENTED 27,473 Sri' ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Operator Field(s) Month/Year of Disposition ~rarrru eT runr~ecmlr Fa(`1r tTY #2 PHILLIPS ALASKA, INC KUPARUKRIVERUNIT 8/01 Disposition Volume MCF* *Indicate contribution of each pool to total 1. Sold 26,514 Pool Name Code Percent 2. Reinjected 3,953,572 KUPARUKRIVLRUNIT 490100 84.27% 3. Flared or vented less than 1 hour 12,950 KUPARUK RIVER UNIT TABASCO 490160 0.18% 4. Flared or vented greater than 1 hour 95 KUPARUK RIVER UNIT TARN 490165 15.55% Su lemental re ort r aired--See 20 AAC 25.235 5. Pilot and Puree 16,946 6. Used for lease operations Fuel 654,840 s 'st 0 7.Other 0 Official Use Onl --Flavin Authorization > 1 hr. TOTAL items 1- 7 4,664,917 1. Safety MCF ~~~Jf MCF 8. NGL eas equivalent produced 0 2. Lease Use 0 3. Conserv. Purposes MCF 9. Purchased gas 10. Transferred from: PBU CGF (LSEOR NGLS) 800,456 ~ ° ~ CPPl 1,566,354 Date " er Corrunis 0 I1. Transferred to: Note: All volumes must be corrected w f cted vol does notinclude volumes of PBU NGLS aquired for LSEOR i j k R pressure of 14.65 psis and to a temperature o e e n s:. Remar reflected online 10 or Na tha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the iti n f di h I hereby certify that the going is hue and correct to the best of my knowledge. o . spos o month following the mont Authority 20 AAC 25.235. Signatur~ Title: Supervisor Date: 09/16/01 ~hd / /~~~ L Fortn 10-422 (Revised 4/95) - PHILLIPS ALASKA, INC. a CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #2 August 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 8/25/01 00:30-05:00 95 Had Known "D" grade damage on MI flowline. Needed to PLANNED Will inspect flowline under pipe support. If no worse depressure flowling to 0 psi to inspect under flowline damage -will wrap w/Denso-tape. Else Replace piping support. TOTAL OVER 1 HOUR 95 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour 95 Less than 1 hour 12,950 Continuous Assist 0 Pilot and Purge 16.946 TOTAL FLARED/VENTED 29,991 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION ICENTRALPROCESSINGFACII.ITY#2 ~ PHIId.IPSALASKA INC ~ KUPAR Disposition Volume MCF* 1. Sold 23,624 2. Reinjected 3,924,985 3. Flared or vented less than 1 hour 12,256 4. Flared or vented greater than 1 hour Su lemental re ort r aired--See 20 AAC 25.235 756 5. Pilot and Puree 17,944 6. Used for lease operations Fuel 637,770 0 7.Other 0 TOTAL items 1- 7 4,617,335 8. NGL eas equivalentvmduced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLSI CPFl 694,099 1,536,017 11. Transferred to: 0 Remarks: Reinjected vol does notinclude volumes of PBU NGLS squired for LSEOR reflected online 10 or Na tha used in SSEOR meter #201 I hereby certify t e fo ing is true and correct to the best of my knowledge. Signature• Title: Supervisor Date: 10/16/01 I K RIVER UNIT Month/Year of Disposition 9/01 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 87.34 KUPARUKRIVERUNITTABASCO 490160 0.18° KUPARUK RIVER UNIT TARN 4901b5 12.48% U Official Use Only--Flaring Authorization > 1 hr. 1. Safety ~ ~ I MCF 2. Lease Use q 5 MCP 3. Conserv. Purposes MCF _ ~t~ 1 1~ 1 i i ~ )C Date `~1l--i~ oner . ss z. %r , Comm Ylat~_: l Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Form 10-412 (Revised 4/95) PHILLIPS ALASKA, INC. ' • CONSERVATION ORDER NO~ • GAS FLARING OR VENTING INCIDENTS CPF #2 September 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 9/23/01 06:47-08:21 78 A GLC turbine failed on start up several times. The casing bleeds were leaking through. 209 Faulty shutdown of "A" GLC. Trouble with "A" GLC start-up. 184 Excessive inlet gas High ambient temperatures. Wind direction change to south. UNPLANNED Repaired "A" GLC 9/22/01 13:33-14:34 9/ 10/O1 10:02-11:05 9/4/01 15:25-16:35 9/ 1 /0l 08:00-11:00 TOTAL OVER 1 HOUR UNPLANNED Reduced inlet gas rates Repaired "A" GLC -~ UNPLANNED Reduced inlet gas rates 190 Inlet temperate change and wind direction UNPLANNED Reduced inlet gas rates Stabilized faciity process and operation 95 Known "D"grade damage on MI Flowline. Had to gas the PLANNED Going to demo effected area of corrosion damaged p line to clear NGL's. This is the second bleed down of the weld in flanges and install a replacement spool. header. 756 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTAL FLARED/VENTED lei 1 i,~nD~nnn~ 756 ~ q5 pb.nh.ed 12,256 0 17 944 30,956 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION PROCESSING FACII.ITY #2 PHILLIPS ALASKA, INC. Disposition Volume MCF* 1. Sold 33,579 2. Reinjected 4,391,275 3. Flared or vented less than 1 hour 20,737 4. Flared or vented greater than 1 hour Su lemental re ort r uired--See 20 AAC 25.235 8,554 5. Pilot and Purge 17,310 6. Used for lease operations Fuel 650,016 0 7.Other 0 TOTAL items 1- 7 5,121,471 8. NGL eas equivalentproduced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLSI CPFl 807,146 1,398,399 11. Transferred to: 0 Remarks: Reinjected vol does not include volumes of PBU NGLS squired for LSEOR reflected online 10 or Na tha used in SSEOR meter #201 I hereby cer//ti''fy.,~th/at the fo/regoing is hue and correct to the best of my knowledge. Signature: /"~' fi 7~ f"~ ~~ Title: Supervisor Date: 11/19/01 d(s) ARUK RIVER UNIT 'ear of Disposition 10/O1 *lndicate contribution of each pool to total Pool Name Code Percent KUPARUK RIVER UNIT 490100 89.66% KUPARUK RIVER UNIT TABASCO 490160 0.12% KUPARUK RIVER UNIT TARN 490165 10.22% Official Use Onl --Flaring Authorization > 1 hr. 1. Safety ~ ~ ~ ~~ MCF 2. Lease Use ~ ~ C ~' MCF 3. Conserv. Purposes MCF -7~~~ ~' ww~.NEJ ~ ~~ Commissioner ~ ~~E Date Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the. month following the month of disposition. Authority 20 AAC 25.235. Form 10-422 (Revised 4/95) PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #2 X2001 ~~ PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 10/13/01 11:47-13:02 2,510 "B" Gas Liff Comp. shutdown /trip on high 1 stage pressure. 'UNPLANNED Replaced 1st & 2nd Stage input /output cards on "B" Gas Liff Comp. 10/11/Ol 10:45-1 ]:49 230 High Uff Gas Tie-Line Pressure UNPLANNED Decreased lift gas tie-line pressure. 10/10/O1 03:28-04:38 2,705 Faulty Shutdown on "B" GLC UNPLANNED. Started "B" GLC. 10/6/01 11:52-13:11 2,972 Insufficient inlet gas. Process upset in gas (GLC s/o) UNPLANNED Stabilized facility process and operation. Repaired equipment difficulties. 10/4/01 18:37-20:06 137 Problem with fuel gas pressure. Controller PIC-1141 UNPLANNED Corrected E&I fluctuation/failure. TOTAL OVER 1 HOUR 8,554 PIANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour 8,554 Less than 1 hour 20,737 Continuous Assist 0 Pilot and Purge 17.310 TOTAL FLAREDNENTED 46,601 ~~a~[~ OCf Q~Q~~(Q/ ~o~e~ ~ ors Mr. Geoff Simpson Supervisor, Production R Revenue Accounting Phillips Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Re: October 2001 Gas Disposition Report, Central Processing Facility Two Dear Mr. Simpson, TONY KNOWLES, GOVERNOR 333 W. 7"' AVENUE, SUITE 100 ANCHORAGE, ALASKA99501-3539 PHONE (907) 279-1433 FAX (907) 27&7542 December 24, 2001 The Alaska Oil and Gas Conservation Commission (AOGCC) has reviewed the Phillips Alaska, Inc. Gas Disposition submission for the Central Processing Facility # 2 for October 2001. The AOGCC reviews the monthly gas disposition reports to determine if the Operator is acting in accordance with good oil field engineering practices and conservation purposes. At its discretion, the Commission will either authorize the flaring or classify the flaring as waste. For each CPF-2 event where gas was flared or vented less than one hour in October 2001, please provide the following additional information: (a) date(s) of flaring event(s); (b) actual time(s) flaring occurred; (c) total time flared per event; (c) a brief description of the activity underway or problem troubleshooting associated with the flared volumes; and (d) a brief description of the action(s) taken to minimize the flared gas volume. In addition, please provide an explanation as to why the CPF-2 pilot and purge volumes are approximately 75% higher than those at CPF-1. We look forward to a written response by the end of the business day, Tuesday, January 15, 2002. Should you have any questions with respect to our information request, please contact me at 793-1231. Sincerely, ~~ c~ Winton Aubert, PhD. Petroleum Engineer ~~~~ ~-c. ~ _S-i` ..,Ir-,_y.~.~ ,,X _ 1-~;.t.~.. ~.~ L..~•,`.k-rwf - ~`'~~ ~ c{~,..~ _.~ t-.,~ ^~-~- L c ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator PHILLIPS ALASKA, INC. Field(s) KUPAR Disposition Volume MCF* 1. Sold 35,190 2. Reinjected 4,746,916 3. Plated or vented less than 1 hour 10,449 4. Flared or vented greater than 1 hour Su lemental r ott r aired--See 20 AAC 25.235 8,685 `~ 5. Pilot and Puree 16,519 6. Used for lease operations Puel 662,179 7.Other 0 TOTAL items 1- 7 5,479,938 8. NGL eas egnivalentproduced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLSI CPFl 862,103 1,406,460 11. Transferred to: 0 Remarks: Reinjected vol does not include volumes of PBU NGLS agaired for LSEOR reflected online 10 or Na tha used in SSEOR meter #201 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signatare~~`~'~d z ~ >~' ~ 1 L~c, =~rvisor Date• 12/20/01 K RIVER UNIT Month/Year of Disposition 11/Ol *Indicate contribution of each pool to total Pool Name Code Percent KUPARUK RIVER UNTI' 490100 90.82% KUPARUK RIVER UNIT TABASCO 490160 0.08°b KUPARUK RIVER UNTf TARN 490165 9.10% U Official Use Onl -- Authorizafion > 1 hr. 1. Safety MCF 2. Lease Use '~~ ~S M~ 3. Conserv. Purposes MCF 1, Commissioner ~' u y Date .. ~ n , Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition Authority 20 AAC 25.235. .- Form 10-422 (Revised4/95) PHILLIPS ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #2 November 2001 PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 11/5/2001 18:21-21:52 6,431 Ground on GLC instrumentation caused turbine s/o. 11 /7/2001 19:13-20:30 2,254 "B" gas tiff compressor ground faulted detected. Check TOTAL OVER 1 HOUR .8,685 8,685 PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour 8,685 8,685 Less than 1 hour 10,449 10,449 Continuous Assist 0 0 Pilot and Purge 16.519 16.519 Unplanned Shut in auto chokes during initial occurance while inst.te made repairs. Unplanned.' Inst. Tech repair goumd fault as needed, shut in 38 proc TOTAL FLARED/VENTED 35,653 35,653 ARCO ALASKA, INC. CONSERVATION ORDER N0.219 GAS FLARING OR VENTING INCIDENTS CPF #2 December PLANNED DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 12/18/2001 .05:38-07:37 4,935 C2-IOIA GLC broken turbine actuatorarm. UNPLANNED Reduced inlet gas rates. • 12/29/2001 02:42-04:09 337 Excessive inlet gas rates into facility. UNPLANNED Reduced inlet gas rates. Stabilized facility process and operation. 12/31 /2001 18:00-00:00 43 Bled Flowline due to wind induces.. Vibration caused cra UNPLANNED Isolated line for repair. in line. TOTAL OVER 1 HOUR 5,315 • PLANNED EVENTS LESS THAN 1 HOUR 0 Flare or Vent Volumes: Greater than 1 hour 5,315 Lessthanlhour 11,301 Continuous Assist 0 Pilot and Purge 16,$85 TOTAL FL,4RED/VENTED 33,201 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility Disposition Volume MCF* 1. Sold 36,188 2. Reinjected 4,887,782 3. Flared or vented less than 1 hour 11,301 4. Flared or vented greater than 1 hour Su lemental r ort r aired--See 20 AAC 25.235 5,315 5. Pilot and Purge 16,585 6. Used for lease operations Fuel 708,849 0 7.Other 0 TOTAL items 1 - 7 5,666,020 8. NGL gas equivalentproduced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS1 CPFl 859,548 1,283,131 11. Transferred to: 0 Remarks: Reinjected. vol does not include volumes of PBU NGLS squired for LSEOR reflected online 10 orNaptha used in SSBOR meter #201 I hereby certify t the f going is true and correct to the best of my knowledge. Signature: ~? Title: Supervisor Date: 1/18/01 PROCESSING FACILITY #2 Operator ALASKA, INC. Field(s) Month/Year of Disposition KUPARUK RI VER UNIT 12/01 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUKRIVERUNIT 490100 88.04% KUPARUK RIVER UNIT MELTWATER 490140 0.74% KUPARUK RIVER UNIT TABASCO 490160 0.08% KUPARUK RIVER UNIT TARN 490165 11.14% Official Use Onl --Faring Authorizafion > 1 hr. L Safety ~, ,3 J ~ MCF 2. Lease Use MCF 3. Conserv. Purposes MCF r"" Co 'ssioner Date Note: All volumes most be corrected to pressure of 14.65 psis and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. • Form 10-422 (Revised 4/95)