FACILITY: DIU-&~M EïL.~
OPERATOR: BP EXPLORATION
(ALASKA) IN C
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Operator
BP Exploration (Alaska) Inc.
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 502,565
3. Flared or vented less than 1 hour 107 .r
4. Flared or vented greater than 1 hour 132 ".....
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 460
6. Used for lease operations Assist 1,044
Fuel 52 552
7. Other
/'
TOTAL items 1-7 556,860
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
Form 10-422
Rev. 4/95
Endicott 1 0450
Month/Year of Disposition
Jan-02
*Indicate contribution of each pool to total.
Pool Name vode Percent
220165
1 . Safety
MCF
2. Lease
MCF
/3>-
3. Conserv. Purposes
MCF
~[1~U ~
Commissio ~r '
?ifdOð
Date
OIL
2,5 <I t-
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
2/6/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Jan-2002
Page 1- .
.
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 2,383
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
. ACTION TAKEN TO ELIMINATE CAUSE
1/6/2002 0230-0530 258
1/9/2002 1620-1720 48
1/21/2002 1310-1420 1404
1/21/2002 1620-1730 1218
TOTAL 2,928
Power generator unit 4501 SID caused booster compressor to shut down. LP
gas routed to flare until power generator and booster compressor restarted.
B-MGC water washed to eliminate fouling. Experimentation to maximize wash
benefit by varying rinse frequency and duration led to flaring over one hour.
Leaking MGC safety valve required all wells to be shut in, full 3-phase flowline
depressurization. Gas in line purged to flare.
Unsuccessful A-MGC start-up attempt after PSV replacement. Delay in restart
to identify cause of start-up failure.
Troubleshooting work on 4501 power generator to determine cause of
failure and eliminate future shut down events.
Although duration of flaring longer than previous water wash procedures,
the total volumes were similar to previous washes. Experimentation
reviewed to determine optimal wash procedures.
Leaking PSV replaced to eliminate future need to fully depressurize
system.
A-MGC start-up failure identified and corrected quickly, brought back on
line. MGC start-up procedures reviewed to minimize future flaring
events.
Planned Events Less Than or E ual1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
o
ACTION TAKEN TO ELIMINATE CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
0
TOTAL EIDR SDN ENDICOTT
2,383 107 2 2,274
2,928 132 2 2,794
10,199 460 8 9,731
23J..6a .1.QM .ta 22..10.5
I
38,678 1,743 31 36,904
Planned Events Exceed!n 1 Hour OR Exceedln 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration (Alaska) Inc.
Field(s)
Eider
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 457,661
3. Flared or vented less than 1 hour 24
4. Flared or vented greater than 1 hour 4/
(Supplemental report required-oSee 20 AAC 25,235)
5. Pilot and Purge 395
6. Used for lease operations Assist 892
Fuel 41 908
7. Other
TOTAL items 1-7 500,884 ./
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
Title WL(~tt 1/.!(X Date 3h'{07_
Form 1 0-422
Rev. 4/95
Endicott 1 0450
Month/Year of Disposition
Feb-02
*Indicate contribution of each pool to total.
Pool Name vOde Percent
220165
1. Safety '-/ MCF VJ4A-
2. Lease MCF 7Ji 2.2.lJ L
3. Conserv. Purposes MCF
~ ~"~¥ ;!:'JJ¿rt~-
commis~r Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
31612002
.. .,
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Feb-2002
Page 1
IUnPlanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 570
DESCRIPTIONOFINCIDENT8,CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTIONTAKENTOEI...IMINATE CAUSE
Investigating changes to DCS control system logic to lessen plant upsets
during water pump shut downs.
2/15/2002 1500-1600 17
P1907 SID on seal buffer pump failure, caused plant upsets and flaring.
2/19/2002
1620-1720
TOTAL
85
102
P1907 SID on seal buffer pump failure, caused plant upsets and flaring. After
P1907 back online, B booster compressor went down, LP gasses flared until
back online. Individually, neither event exceeded 1 hour of flaring.
Seal buffer work completed on P1907 while equipment was down.
Investigating changes to DCS control system logic to lessen plant upsets
during water pump shut downs.
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
o
ACTION TAKEN TO ELIMINATE CAUSE
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
0
TOTAL EIDR SDN ENDICOTT
570 24 0 546
102 4 0 98
9,212 395 6 8,811
2O..a2.Q ß.92 13 ~
30,704 1,315 19 29,370
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration (Alaska) Inc.
Field(s)
Eider
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 439,028
3. Flared or vented less than 1 hour 26
4. Flared or vented greater than 1 hour 7 ./
(Supplemental report required,-See 20 AAC 25,235)
5. Pilot and Purge 386
6. Used for lease operations Assist 877
Fuel 41 327
7. Other
TOTAL items 1-7 481,651 J
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
Title ~ú (L TA::)( Date
Form 10-422
Rev. 4/95
Endicott 10450
Month/Year of Disposition
Mar-02
*Indicate contribution of each pool to total.
Pool Name L-Ode Percent
220165
1 . Safety Î MCF
2. Lease MCF t;J6k-
3. Conserv. Purposes MCF
(~tJqJd.1,cr 4þq/o"
Commissi er Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
4/3/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Mar-2002
Page 1
lunPlanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 691
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
lunPlanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
High level in "B" CPI caused field SID. "B" Booster compressor shut down on
high vibration following start-up, "A" Booster could not be started. LP gases
flared until "B" back online. Flared assist gas to control opacity.
ACTION TAKEN TO ELIMINATE CAUSE
Booster compressor restarted ASAP. Troubleshooting to identify root
cause of CPI high level.
3/27/2002 1520-1710 185
TOTAL 185
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mef
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
o
ACTION TAKEN TO ELIMINATE CAUSE
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
0
TOTAL EIDR SDN ENDICOTT
691 26 0 665
185 7 0 178
10,199 386 7 9,806
23JM ill .15 22.2.Q2
34,229 1,296 22 32,911
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s)
Eider
Operator
BP Exploration (Alaska
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 347,277
3. Flared or vented less than 1 hour 21
4. Flared or vented greater than 1 hour 2 /'
(Supplemental report required--See 20 AAC 25,235)
5. Pilot and Purge 319
6. Used for lease operations Assist 720
Fuel 39 428
7. Other
TOTAL items 1-7 387,767 //
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby cert~ that the
Signature 1<" Q.
Title Múrt î4x Date ~/(,/o'1..
Form 10-422
Rev. 4/95
Endicott 10450
*Indicate contribution of each pool to total.
Pool Name lJode Percent
220165
1. Safety
MCF ¡,...¡l;Ä-
2. Lease
l MCF
3. Conserv. Purposes
MCF
~~.~
~
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
5/3/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Apr-2002
Page 1
lunPlanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 652
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~unplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
B-MGC SID for scheduled water wash. Gas compressor spun with copus gas
expansion turbine to look for air leaks and verify integrity.
ACTION TAKEN TO ELIMINATE CAUSE
Although scheduled lube oil mist eliminator work may help reduce
frequency of water washes, integrity tests will still be run regularly.
4/14/2002 0720-0850 70
TOTAL 70
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
o
'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
0
TOTAL EIDR SDN ENDICOTT
652 21 0 631
70 2 0 68
9,870 319 7 9,544
22.W I2Q 11 21.52a
32,857 1,062 24 31,771
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s)
Eider
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 284,344
3. Flared or vented less than 1 hour 15
4. Flared or vented greater than 1 hour /'
4
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 264
6. Used for lease operations Assist 617
Fuel 36 966
7. Other
TOTAL items 1-7 322,210
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
Title M~4- TA-k' Date ~
Form 10-422
Rev. 4/95
Endicott 10450
*Indicate contribution of each pool to total.
Pool Name vOde Percent
220165
pi 'iz~"'----
1. Safety MCF
2. Lease 4- MCF
3. Conserv. Purposes MCF
c~:J::i~ ~//ð2-
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
..
ðl3fZ-
6/6/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
May-2002
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 592
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~Unplanned Events greater than 1 hour
DATE TIME VOLUME
5/24/2002 0150-0520 166
TOTAL 166
DESCRIPTION OF INCIDENT & CAUSE
Safe Out of propane compressor for repairs.
ACTION TAKEN TO ELIMINATE CAUSE
Assist gas used to control opacity of excess propane sent to the flare.
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
o
ACTION TAKEN TO ELIMINATE CAUSE
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
0
TOTAL EIDR SDN ENDICOTT
592 15 0 577
166 4 0 162
10,199 264 7 9,928
~ ill 12 ~
34,789 900 23 33,866
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s)
Eider
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 177,806
3. Flared or vented less than 1 hour 56
4. Flared or vented greater than 1 hour 54 ,/
(Supplemental report required-oSee 20 AAC 25,235)
5. Pilot and Purge 184
6. Used for lease operations Assist 430
Fuel 38.021
7. Other
TOTAL items 1-7 216,551
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that tht:0ing is true and correct to the best of my knowledge.
Signature Q. O. /¡"" lÞ. Title ¥L1.ú 11- 'T />('X' Date -¡{ 't t 67.-
Form 1 0-422
Rev. 4/95
Endicott 10450
Month/Year of Disposition
Jun-02
*Indicate contribution of each pool to total.
Pool Name vOde Percent
220165
1 . Safety 54- MCF ,:(~
2. Lease MCF
3. Conserv. Purposes MCF
c~~,~ <rl(fð~
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
7/5/2002
.
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Jun-2002
Page 1
~~nplannedEv~nts ~reater than 1. hour
···;DAT¡¡¡'· ·TIMI;····· ·······YQIi1I.!MI;······· ,...
6/17/2002 0920-1240 928
6/27/2002 0000-1930 795
6/25/2002 2020-2200 300
6/20/2002 1730-191 0 228
6/26/2002 1720-2050 167
6/5/2002 1000-1530 104
6/25/2002 1740-1840 96
6/17/2002 1530-1710 79
6/19/2002 1820-2120 73
6/25/2002 2020-2200 49
6/1/2002 1340-1440 46
6/5/2002 1600-1750 37
6/25/2002 1730-1840 7
TOTAL 2,909
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
º~;rl;..."". ·········;I"IMI;·'··············· ······VºI.i"'MI;·· ....... ..,............. ..... ·····º'ª~çF!lg;rIºNºFll\Iç!p'ªl\I;rBlçA(.J§ç
IUnplanned Events less than or equal to 1 hour
. DATE ..... .. . . TIME ···VOLUME.· .
TOTAL 3,022
Pç~ºF!IR;rIºl\Iº¡:;Ifjº'º¡;N;r.t:·º~IJ~I:··;······
Not required for unplanned events which
are less than or equal to 1 hour
ACTIONTAKENTOELIMINATI;CAUSE .... .'
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
. ····pl;$Qf!I~'fIQ\jQfINQ![)I$N'f~QAI.!$I;···
Power generator failed. Full field shut down
MI compressor shutdown. Leaking valve
Propane compressor gas handling
MI compressor startup
MI compressor startup
PSV Leak
Propane compressor gas handling
Startup of power generator.
P1907 water injection pump shut down
Propane compressor startup
B MGC startup
PSV Leak
Propane compressor shut down
··AQ'fIQN'fAKE$NtQI;IjII\¡\INA'f.l;QAI.!$E$·······
Shut wells in.
Fixed MI Compressor and restart
Choke wells back and stablize plant
Un-successful attempt. Shut down to evaluate.
Compresser started
Track down PSV and fixed PSV
Choke wells back and stablize plant
Power generator startup completed.
Shut wells in.
Propane compresser was started
Successful startup of B MGC
Track down PSV and fixed PSV
Propane system was isolated
ACTION TAK.ENTO ELIMINATE CAUSE .
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
. DATE. . .... . TIME . .. ··..VOLUME. .' DESCRIPTION OFINCIDENT& CAUSE .
TOTAL
o
ACTION TAKEN TOEL,IMINATE CAUSE
Volume flared less than 1 hr 3,022 56 2,965
Volume flared greater than 2,909 54 2,854
1 hr
Pilot Purge 9,870 184 5 9,681
Assist Gas ~ ~ 11 ~
TOTAL FLARED VOLUME 38,926 724 18 38,184
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s)
Eider
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 92,632
3. Flared or vented less than 1 hour 60
4. Flared or vented greater than 1 hour 51
(Supplemental report required-oSee 20 AAC 25,235)
5. Pilot and Purge 124
6. Used for lease operations Assist 292
Fuel 35474
7. Other
TOTAL items 1-7 128,633
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby cer;ï that t e foregoing is true and correct to the best of my knowledge.
Signature ,<J:}. Title m.úlL í~ Date f:J!ep{01-
Form 10-422
Rev. 4/95
Endicott 10450
Month/Year of Disposition
Jul-02
*Indicate contribution of each pool to total.
Pool Name voce Percent
220165
1. Safety
~I
(JSP-
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
C ·J"~t,!,.J; ;.'t'
Commlssl er
~
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
81612002
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 3,137
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Jul-2002
Page 1
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
07/05/02 19:40-00:00 156
07106102 00:00-09:30 357
07/06102 13:20-14:30 20
07/08102 09:30-13:40 45
07/09/02 08:20-21:30 1110
07/13/02 08:30-18:40 45
07/14/02 15:10-00:00 174
07/15/02 00:00-00:00 232
07/16/02 00:00-00:00 278
07/17/02 00:00-07:50 163
07/29/02 08:20-20:40 191
07/29/02 22:40-00:00 27
07/31/02 07:00-16:10 165
07/31/02 16:40-21:20 74
TOTAL 3,037
DESCRIPTION OF INCIDENT & CAUSE
B Booster compressor shut down.
B Booster compressor shut down.
Propane compressor startup
A-Booster shut down.
B Booster compressor shut down.
A Booster compressor shut down. Leaking 2 stage discharge valve.
A Booster compressor shut down. Leaking 2 stage discharge valve.
A Booster compressor is down. Leaking 2 stage discharge valve.
A Booster compressor Is down on lock rotor. Leaking 2 stage discharge valve.
A Booster compressor is down. Leaking 2 stage discharge valve.
Plant Startup Upset
Plant Startup Upset
B-Booster down on locked rotor and propane compressor down
B-Booster down on locked rotor and propane compressor down
ACTION TAKEN TO ELIMINATE CAUSE
Add assist gas to eliminate black smoke down. B-Booster started at
7/6/02
Add assist gas to eliminate black smoke down. B-Booster started.
Propane compressor started.
Added assit gas to eliminate black smoke.
Add assist gas to eliminate black smoke down. B-Booster started at
21:30
Trouble shooting leak on B-Booster. Assist gas added.
Attempting to grease / repair valve
Attempting to grease / repair valve
Attempting to grease / repair valve
Attempting to grease / repair valve. Grease now holding.
Adjusted well set to eliminate. Une out A MGC. Started propane
compressor. B-Booster start
Adjusted well set to eliminate
Assist gas added. Block in B- booster. Started up A -Booster
Assist gas added. Started up propane comprssor
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
07/26/02 16:10-18:20 425 Flare valve test
07/27/02 02:00-02:00 58 Full Plant shut down for major repairs.
07/27/02 02:40-02:50 153 Full Plant shut down for major repairs.
07/27/02 05:20-05:50 853 Full Plant shut down for major repairs.
07/27/02 06:50-07:00 301 Full Plant shut down for major repairs.
TOTAL 1,790
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
07/27/02 03:10-05:00 961 Full Plant shut down for major repairs.
07/27/02 09:40-12:40 160 Full Plant shut down for major repairs.
TOTAL 1,121
ACTION TAKEN TO ELIMINATE CAUSE
Completed test in a timely manner
Plant safe out.
Plant safe out.
Plant safe out.
Plant safe out.
TOTAL EIDR
Volume flared less than 1 hr 4,927 60
Volume flared greater than 4,158 51
1 hr
Pilot Purge 10,199 124
Assist Gas 24.Q5Q m
TOTAL FLARED VOLUME 43,334 527
ACTION TAKEN TO ELIMINATE CAUSE
Plant safe out.
Plant safe out.
SDN
3
ENDICOTT
4,864
3
4,104
6
10,069
1a
23.lli
25
42,782
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration (Alaska
Field(s)
Eider
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 102,775
3. Flared or vented less than 1 hour 13
4. Flared or vented Qreater than 1 hour 2 /
(Supplemental report required-oSee 20 AAC 25,235)
5. Pilot and Purge 131
6. Used for lease operations Assist 300
Fuel 33 160
7. Other
TOTAL items 1-7 136,381
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby cert~that th~Oing is true and correct to the best of my knowledge.
Signature ~.¿. a, ~ Title M~(l/fP<}< Date..9../ t 'd/O1-
Form 10-422
Rev. 4/95
Endicott 10450
*Indicate contribution of each pool to total.
Pool Name vOde Percent
220165
1. Safety z..--r MCF 58(%-
2. Lease MCF
3. Conserv. Purposes MCF
(~~U.~ It / xf~?-
Commlssl er Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
9/9/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Aug-2002
Page 1
Unplanned Events less than or equal to 1 hour
TOTAL
1,015
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
lunPlanned Events ~reater than 1 hour
. ,DATE· TIME . VOLUME
8/3/2002 0900-1010 29
8/14/2002 1850-2350 33
8/26/2002 1200-1320 46
8/28/2002 1350-1650 77
TOTAL 185
·:.rÆ~~~ølJ1Jl(~rf£~"£II~lrÆ~¡fi£~i~~J.t~e2
Booster compressor down
High ambient temperature upset propane and gas compressors
MI Com presser re-start attempted
MI Com presser re-start
','ACTfONTAKENTO·ELlMINATECAUSE "
Re-started booster
Stablized equipment
Shut down to evaluate problem.
Started compressor
'Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
,,·DATE· ,TIME VOLUME "DESCRJPT;IONOFINCIDErfT&CAUSE
. ACTION TAKEN TO ,ELIMINATE ÇAUSE
TOTAL
o
Planned Events Exceedin 1 Hour OR Exceeding 5000 Mcf
TOTAL
o
Volume flared less than 1 hr 1,001
Volume flared greater than 185 2 0 183
1 hr
Pilot Purge 10,199 131 10 10,058
Assist Gas ~ aQQ 2.4 ~
TOTAL FLARED VOLUME 34,763 446 35 34,282
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Disposition
Operator
BP Exploration (Alaska) Inc.
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 113,937
3. Flared or vented less than 1 hour 21
4. Flared or vented greater than 1 hour 19 c./
(Supplemental report required-oSee 20 AAC 25,235)
5. Pilot and Purge 139
6. Used for lease operations Assist 324
Fuel 40 459
7. Other
TOTAL items 1-7 154,899
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
I hereby certi
true and correct to the best of my knowledge.
Title (1116't í.A:-X Date H:¡, I It I 07~
Form 10-422
Rev. 4/95
.
Endicott 10450
Month/Year of Disposition
Sep-02
*Indicate contribution of each pool to total.
Pool Name lvode Percent
220165
1. Safety Ie¡ MCF -::JStz-
2. Lease MCF
3. Conserv. Purposes MCF
{ ~
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
10/3/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Sep-2002
Page 1
TOTAL
1,489
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
0900-1020 102
9/5/2002 1210-2030 631
91612002 0650-1020 152
9/11/2002 1530-1730 33
9/16/2002 2050-2150 435
TOTAL 1,353
MI Compressor re-start
Booster compressor shutdown - assist gas added to keep opacity below
minimums
Booster compressor shutdown - assist gas added to keep opacity below
minimums
MI Compressor re-start
Started compressor
Restarted booster compressor
Restarted booster compressor
Started compressor
Shut down main gas compression train for high vibration. Depressurization took
longer than expected due to difficulties encountered with knock-out drum liquids. Stabilized equipment
TOTAL
o
TOTAL
o
Volume flared less than 1 hr 1 ,489 21 1,467
Volume flared greater than 1,353 19 1,333
1 hr
Pilot Purge 9,870 139 7 9,724
Assist Gas 2UM ~ 11 22.223
TOTAL FLARED VOLUME 35,676 503 26 35,147
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s)
Eider
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 192,038
3. Flared or vented less than 1 hour 30
4. Flared or vented greater than 1 hour 0
(Supplemental report required··See 20 AAC 25,235)
5. Pilot and Purge 252
6. Used for lease operations Assist 594
Fuel 45 167
7. Other
TOTAL items 1-7 238,081
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby cert" that th
Signature kO
Title f\I\ <> a, 'Ä X Date
Form 10-422
Rev. 4/95
Endicott 1 0450
Month/Year of Disposition
Oct-02
*Indicate contribution of each pool to total.
Pool Name L,Ode Percent
220165
1 . Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
·
11/6/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Oct-2002
Page 1
Unplanned Events less than or equal to 1 hour
TOTAL
1,212
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mcf
TOTAL 0
TOTAL 0
Volume flared less than 1 hr 1,212 30 1,181
Volume flared greater than 0 0 0 0
1 hr
Pilot Purge 10,199 252 6 9,941
Assist Gas ~ ~ 14 ~
TOTAL FLARED VOLUME 35,471 876 21 34,574
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
FieJd(s)
Eider
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 181,133
3. Flared or vented less than 1 hour 44
4. Flared or vented greater than 1 hour 0
(Supplemental report required-oSee 20 AAC 25,235)
5. Pilot and Purge 198
6. Used for lease operations Assist 447
Fuel 31 608
7. Other
TOTAL items 1-7 213,430
8. NGL gas equivalent produced 0
9. Purchased gas
10. Transferred from:
11. Transferred to:
is true and correct to the best of my knowledge.
Title fIA,~fL íAX Date -¿/~/<J.1..
Form 1 0-422
Rev. 4/95
Endicott 10450
Month/Year of Disposition
Nov-02
*Indicate contribution of each pool to total.
Pool Name vOde Percent
220165
1 . Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
12/4/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Nov-2002
Page 1
Un lanned Events less than or equal to 1 hour
TOTAL
2,174
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Un lanned Events greater than 1 hour
TOTAL 0
Planned Events LessThan or Equal 1 Hour AND Not Exceedin
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
TOTAL 0
Volume flared less than 1 hr 2,174 44 2,129
Volume flared greater than 0 0 0 0
1 hr
Pilot Purge 9,870 198 5 9,667
Assist Gas 22.3Q3 ID 1D 21M2
TOTAL FLARED VOLUME 34,347 689 16 33,642
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s)
Eider
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 0
2. Reinjected 267,788
3. Flared or vented less than 1 hour 42
4. Flared or vented greater than 1 hour 28 ,,,/
(Supplemental report required-oSee 20 AAC 25,235)
5. Pilot and Purge 249
6. Used for lease operations Assist 560
Fuel 51 790
7. Other
TOTAL items 1-7 320,457
8. NGL gas equivalent produced 0
9. Purchased Qas
10. Transferred from:
11. Transferred to:
Signature
true and correct to the best of my knowledge.
Title Ýhl,(Z.. l' L\x Date I k./ b '3
Form 10-422
Rev. 4/95
Endicott 1 0450
Month/Year of Disposition
Dec-02
*Indicate contribution of each pool to total.
Pool Name (;oae Percent
220165
1. Safety
Z9J MCF 5Bi2--
2. Lease
MCF
3. Conserv. Purposes
MCF
ðfolo3
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
1/612003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Dec-2002
Page 1
tunplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 1,733
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
lunplanned Events greater than 1 hour
DATE TIME VOLUME
12/11/2002 1200-1640 626
12/16/2002 0210-0530 490
12/16/2002 0030-0140 29
TOTAL 1,145
DESCRIPTIONiOF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Reviewed operating parameters, adjust plenum temperature set point to
Booster compressor, 2nd stage flow hydrated off. prevent formation of hydrates.
Booster compressor down, plenum too cold and gas path through thin fan colers Reviewed operating parameters, adjust plenum temperature set point to
hydrated off. prevent formation of hydrates.
Booster compressor down, plenum too cold and gas path through thin fan colers Reviewed operating parameters, adjust plenum temperature set point to
hydrated off. prevent formation of hydrates.
ACTION TAKEN TO ELIMINATE CAUSE
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION<OF>INCIDENTi& CAUSE
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
0
TOTAL EIDR
1,733 42
1,145 28
10,199 249
22..959 .56Q
36,036 879
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
SDN
2
ENDICOTT
1,689
1,116
10
9,940
22
22..3ZZ
35
35,122