FACILITY: DIU ~ S~, Ð<.J-rA
OPERATOR: BP EXPLORATION
(ALASKA) IN C
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s) Endicott 10450
Delta North
MonthNear of Disposition
Jan-02
Operator
BP Exploration (Alaska
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 122
2. Reinjected -7,545
3. Flared or vented less than 1 hour 2 /
4. Flared or vented greater than 1 hour 2 .r
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 8
6. Used for lease operations Assist 19
Fuel 17 437
7. Other
TOTAL items 1-7 10,045
8. NGL gas equivalent produced 122
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
that the oregoing is true and correct to the best of my knowledge.
Title M() CL 1)/I(S£' Date z.l (, t , ~ L
Form 1 0-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name voae Percent
220150
1 . Safety
MCF
2. Lease
MCF
~
3. Conserv. Purposes MCF
cb~ ~ D1<10"
OIL- W
z Z,.s QL
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
2/6/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Jan-2002
Page 1'"
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 2,383
DESCRIP ION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION· TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
Iunplanned Events greater than 1 hour
DATE TIME VOLUME
1/6/2002 0230-0530 258
1/9/2002 1620-1720 48
1/21/2002 1310-1420 1404
1/21/2002 1620-1730 1218
TOTAL 2,928
DESCRIPTION OF INCIDENT & CAUSE
Power generator unit 4501 SID caused booster compressor to shut down. LP
gas routed to flare until power generator and booster compressor restarted.
B-MGC water washed to eliminate fouling. Experimentation to maximize wash
benefit by varying rinse frequency and duration led to flaring over one hour.
Leaking MGC safety valve required all wells to be shut in, full 3-phase flowline
depressurization. Gas in line purged to flare.
Unsuccessful A-MGC start-up attempt after PSV replacement. Delay in restart
to identify cause of start-up failure.
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
- . ACTION TAKEN TO ELIMINATE CAUSE
Troubleshooting work on 4501 power generator to determine cause of
failure and eliminate future shut down events.
Although duration of flaring longer than previous water wash procedures,
the total volumes were similar to previous washes. Experimentation
reviewed to determine optimal wash procedures.
Leaking PSV replaced to eliminate future need to fully depressurize
system.
A-MGC start-up failure identified and corrected quickly, brought back on
line. MGC start-up procedures reviewed to minimize future flaring
events.
TOTAL
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKENTOEI.IMINATECAUSE
ACTION TAKEN TO ELIMINATE CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
0
TOTAL EIDR ENDISOVl'
2,383 107 2 2,274
2,928 132 2 2,794
10,199 460 8 9,731
2a..16ß ~ .19 22J..Q5
38,678 1,743 31 36,904
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration (Alaska) Inc.
Field(s) Endicott 10450
Sa Delta North
MonthNear of Disposition
Feb-02
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 105
2. Reinjected -4,642
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 6
6. Used for lease operations Assist 13
Fuel 11 573
7. Other
TOTAL items 1-7 7,055
8. NGL gas equivalent produced 105
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
Title M ~Q. ï~ Date 3/fQ/01-
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name L;ode Percent
220150
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
3/6/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Feb-2002
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 570
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
Investigating changes to DCS control system logic to lessen plant upsets
during water pump shut downs.
2/15/2002 1500-1600 17
P1907 SID on seal buffer pump failure, caused plant upsets and flaring.
2/19/2002
1620-1720
TOTAL
85
102
P1907 SID on seal buffer pump failure, caused plant upsets and flaring. After
P1907 back online, B booster compressor went down, LP gasses flared until
back online. Individually, neither event exceeded 1 hour of flaring.
Seal buffer work completed on P1907 while equipment was down.
Investigating changes to DCS control system logic to lessen plant upsets
during water pump shut downs.
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT&>CAUSE
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
o
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOI..UME DESCRIPTION/OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
0
TOTAL EIDR SDN ENDISOTT
570 24 0 546
102 4 0 98
9,212 395 6 8,811
2Q...82Q ß92 13 ~
30,704 1,315 19 29,370
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
BP Exploration (Alaska) Inc.
Field(s) Endicott 10450
Sa Delta North
MonthN ear of Disposition
Mar-02
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 113
2. Reinjected -6,005
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 7
6. Used for lease operations Assist 15
Fuel 14 075
7. Other
TOTAL items 1-7 8,205
8. NGL gas equivalent produced 113
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
Title p1I!ú (L ÍÄ 'X Date \{ [,,<, 0"2..
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name voae Percent
220150
Ii·· i
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
4/3/2002
., -
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Mar-2002
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 691
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
lunplanned Events greater than 1 hour
DATE TIME VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
DESCRIPTION OF INCIDENT & CAUSE
High level in "B" CPI caused field SID. "B" Booster compressor shut down on
high vibration following start-up, "A" Booster could not be started. LP gases
flared until "B" back online. Flared assist gas to control opacity.
Booster compressor restarted ASAP. Troubleshooting to identify root
cause of CPI high level.
3/27/2002 1520-1710 185
TOTAL 185
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
Jplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
0
TOTAL EIDR SDN ENDISOVl'
691 26 0 665
185 7 0 178
10,199 386 7 9,806
~ ill 1.5 22.2Q2
34,229 1,296 22 32,911
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s) Endicott 10450
Sa Delta North
Volume MCF*
Disposition
1. Sold Fuel 0
NGL 129
2. Reinjected -3,310
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 7
6. Used for lease operations Assist 17
Fuel 12124
7. Other
TOTAL items 1-7 8,967
8. NGL gas equivalent produced 129
9. Purchased gas
10. Transferred from:
11. Transferred to:
I he"by cef?that1hC;' ~ ""e a"d oo"eo1 Iú the be" of my '"owledge.
Signature (1. ~~ Title f'A"/(. ~~ Date s:ff.4f{)7-
Form 1 0-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name voae Percent
220150
1 . Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
5/3/2002
..
BP EXPLORATION (ALASKA) INC.
ADMINISTRA TIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Apr-2002
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 652
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
IUnplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
S-MGC SID for scheduled water wash. Gas compressor spun with copus gas
expansion turbine to look for air leaks and verify integrity.
ACTIONTAKEN·TOELIMINATE CAUSE
Although scheduled lube oil mist eliminator work may help reduce
frequency of water washes, integrity tests will still be run regularly.
4/14/2002 0720-0850 70
TOTAL 70
~Planned Events Less Than or Equal 1 Hour AND Not Exceedin~ 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
o
ACTION TAKEN TO ELIMINATE CAUSE
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
0
TOTAL EIDR SDN ENDISOTT .
652 21 0 631
70 2 0 68
9,870 319 7 9.544
22.æ Z2Q 1Z 2.U2a
32,857 1,062 24 31,771
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s) Endicott 10450
Sa Delta North
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 86
2. Reinjected -4,679
3. Flared or vented less than 1 hour 0
4. Flared or vented greater than 1 hour 0
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 7
6. Used for lease operations Assist 16
Fuel 12840
7. Other
TOTAL items 1-7 8,270
8. NGL gas equivalent produced 86
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the oregoing is true and correct to the best of my knowledge.
Signature
Title mb Q.,.T A:'k Date ~
Form 1 0-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name L;oae Percent
220150
1. Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
6/612002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
May-2002
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 592
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
Iunplanned Events greater than 1 hour
DATE TIME VOLUME
5/24/2002 0150-0520 166
TOTAL 166
DESCRIPTION OF INCIDENT & CAUSE
Safe Out of propane compressor for repairs.
ACTION TAKEN TO ELIMINATE CAUSE
Assist gas used to control opacity of excess propane sent to the flare.
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
ACTION TAKEN TO ELIMINATE CAUSE
TOTAL 0
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
0
TOTAL EIDR SDN ENDICOTT
592 15 0 577
166 4 0 162
10,199 264 7 9,928
~ ill 12 ~
34,789 900 23 33,866
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration (Alaska) Inc.
Field(s) Endicott 10450
Delta North
MonthNear of Disposition
Jun-02
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 73
2. Reinjected -4,944
3. Flared or vented less than 1 hour 1
4. Flared or vented greater than 1 hour 1 t/
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 5
6. Used for lease operations Assist 11
Fuel 10492
7. Other
TOTAL items 1-7 5,639
8. NGL gas equivalent produced 73
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Q. Q.Iu.(~.Þ.. Title Y'YI.61l., T~x Date 1.1q/Ô'2-
Form 1 0-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name vOde Percent
220150
1. Safety I MCF 58.----
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
7/5/2002
¡Unplanned Events less than or equal to 1 hour
. DATE ..... . TIME.'· ........ VOkUME'
TOTAL 3,022
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Jun-2002
Page 1
ºE§º¡;U~;FIºNºfINgl[):E\T~º~USE
Not required for unplanned events which
are less than or equal to 1 hour
·~gTIºNT~KçNTº'Ekl!illINATEº~LI§E.i·········
Not required for unplanned events which
are less than or equal to 1 hour
tUnPlanned~vents ~reater than 1.. hour
. . [)Al'Ç 'TI!iII!; . .. ···VØt;UM1:
6/17/2002 0920-1240 928
6/27/2002 0000-1930 795
6/25/2002 2020-2200 300
6/20/2002 1730-1910 228
6/26/2002 1720-2050 167
6/5/2002 1 000-1530 1 04
6/25/2002 1740-1840 96
6/17/2002 1530-1710 79
6/19/2002 1820-2120 73
6/25/2002 2020-2200 49
6/1/2002 1340-1440 46
6/5/2002 1600-1750 37
6/25/2002 1730-1840 7
TOTAL 2,909
tPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
t!~TE ................ ·']!iIIE·········· ..... ···"ºI.iLlMç· ........................... ··········D秺flIPIIºNOf'INqlt!Ç\T~C~LlSE···
TOTAL
o
Oç$CFtIP"'lØNØFJN.cIP:ENT~cÄI,JS.I$·...·...·.·.·..·.'..··
Power generator failed. Full field shut down
MI compressor shutdown. Leaking valve
Propane compressor gas handling
MI compressor startup
MI compressor startup
PSV Leak
Propane compressor gas handling
Startup of power generator.
P1907 water injection pump shut down
Propane compressor startup
B MGC startup
PSV Leak
Propane compressor shut down
...... ·AcnøNTÄK:ENTØI$I.1IMINÄT:Ecĺ$1$
Shut we lis in.
Fixed MI Compressor and restart
Choke wells back and stablize plant
Un-successful attempt. Shut down to evaluate.
Com presser started
Track down PSV and fixed PSV
Choke wells back and stablize plant
Power generator startup completed.
Shut wells in.
Propane compresser was started
Successful startup of B MGC
Track down PSV and fixed PSV
Propane system was isolated
.. ACTION TAKEN TO ELIMINATE CAUSE . .
. ACTlqN TAKEN TO ELIMINATE CAUSE
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE ." TIME· . .. Vql.iUME .. .' DESCRIPTtONOF INCIDENT & CAUSE
TOTAL
o
Volume flared less than 1 hr 3,022 56 2,965
Volume flared greater than 2,909 54 2,854
1 hr
Pilot Purge 9,870 184 5 9,681
Assist Gas 2.3.12.5 ~ 11 22..684
TOTAL FLARED VOLUME 38,926 724 18 38,184
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
BP Exploration (Alaska) Inc.
Field(s) Endicott 10450
Sa Delta North
Month/Year of Disposition
Jul-02
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 53
2. Reinjected -5,490
3. Flared or vented less than 1 hour 3
4. Flared or vented greater than 1 hour 3
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Purge 6
6. Used for lease operations Assist 13
Fuel 11 184
7. Other
TOTAL items 1-7 5,772
8. NGL gas equivalent produced 53
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that t
Signature Q.Q
Title rt{.G. fL í ^:i..
Date 8'<'(0 z..
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name l;oae Percent
220150
1. Safety
..3 MCF (f5P--
2. Lease
MCF
3. Conserv. Purposes
MCF
~ f,¡·¿.~t ~
Commission Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
8/612002
~Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 3,137
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Jul·2002
Page 1
DESCRIPTION OF INCIDENT ... CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
Iunplanned Events greater than 1 hour
DATE TIME VOLUME
07/05/02 19:40-00:00 156
07/06102 00:00-09:30 357
07/06102 13:20-14:30 20
07/06102 09:30-13:40 45
07/09/02 08:20-21 :30 1110
07/13102 08:30-16:40 45
07/14/02 15:10-00:00 174
07/15/02 00:00-00:00 232
07/16102 00:00-00:00 278
07/17/02 00:00-07:50 163
07/29102 08:20-20:40 191
07/29/02 22:40-00:00 27
07/31/02 07:00-16:10 165
07/31/02 16:40-21:20 74
TOTAL 3,037
DESCRIPTION OF INCIDENT'" CAUSE
B Booster compressor shut down.
B Booster compressor shut down.
Propane compressor startup
A-Booster shut down.
B Booster compressor shut down.
A Booster compressor shut down. Leaking 2 stage discharge valve.
A Booster compressor shut down. Leaking 2 stage discharge valve.
A Booster compressor is down. Leaking 2 stage discharge valve.
A Booster compressor is down on lock rotor. Leaking 2 stage discharge valve.
A Booster compressor is down. Leaking 2 stage discharge valve.
Plant Startup Upset
Plant Startup Upset
B-Booster down on locked rotor and propane compressor down
B-Booster down on locked rotor and propane compressor down
ACTION TAKEN TO..ELIMINATE CAUSE
Add assist gas to eliminate black smoke down. B-Booster started at
7/6/02
Add assist gas to eliminate black smoke down. B-Booster started.
Propane compressor started.
Added assit gas to eliminate black smoke.
Add assist gas to eliminate black smoke down. B-Booster started at
21:30
Trouble shooting leak on B-Booster. Assist gas added.
Attempting to grease / repair valve
Attempting to grease / repair valve
Attempting to grease / repair valve
Attempting to grease / repair valve. Grease now holding.
Adjusted well set to eliminate. Line out A MGC. Started propane
compressor. B-Booster start
Adjusted well set to eliminate
Assist gas added. Block in B- booster. Started up A -Booster
Assist gas added. Started up propane comprssor
JPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT'" CAUSE
07/26/02 16:10-16:20 425 Flare valve test
07/21/02 02:00-02:00 58 Full Plant shut down for major repairs.
07/27102 02:40-02:50 153 Full Plant shut down for major repairs.
07/27/02 05:20-05:50 853 Full Plant shut down for major repairs.
07/27/02 06:50-07:00 301 Full Plant shut down for major repairs.
TOTAL 1,790
ACTION TAKEN TO ELIMINATE CAUSE
Completed test in a timely manner
Plant safe out.
Plant safe out.
Plant safe out.
Plant safe out.
JPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT'" CAUSE
07/27/02 03:10-05:00 961 Full Plant shut down for major repairs.
07/27/02 09:40-12:40 160 Full Plant shut down for major repairs.
TOTAL 1,121
TOTAL EIDR
Volume flared less than 1 hr 4,927 60
Volume flared greater than 4,158 51
1 hr
Pilot Purge 10,199 124
Assist Gas 2W5Q m
TOTAL FLARED VOLUME 43,334 527
ACTION TAKEN TO ELIMINATE CAUSE
Plant safe out.
Plant safe out.
SDN
3
ENDICOTT
4,864
3
4,104
6
10,069
.1a
2.U45
25
42,782
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s) Endicott 10450
Delta North
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 161
2. Reinjected -6,780
3. Flared or vented less than 1 hour 1
4. Flared or vented greater than 1 hour 0 ./
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 10
6. Used for lease operations Assist 24
Fuel 17309
7. Other
TOTAL items 1-7 10,725
8. NGL gas equivalent produced 161
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certif that the foregoing is true and correct to the best of my knowledge.
Signature Title ftIt6(l TÞøC Date £f1ô/(rz.
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name \"Ode Percent
220150
1 . Safety
D MÇF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
/'
u~
9/9/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Aug-2002
Page 1
TOTAL
Unplanned Events less than or equal to 1 hour
1,015
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
8/3/2002
8/14/2002
8/26/2002
8/28/2002
0900-1010
1850-2350
1200-1320
1350-1650
TOTAL
29
33
46
77
185
Re-started booster
Stablized equipment
Shut down to evaluate problem.
Started compressor
Sooster compressor down
High ambient temperature upset propane and gas compressors
MI Compresser re-start attempted
MI Compresser re·start
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
. DATE . TIME . VOLUME .. ..... DESCRIPTION OF INCIDENT &: CAUSE .
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
o
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mct
TOTAL
o
Volume flared less than 1 hr 1,015 13
Volume flared greater than 185 2 0 183
1 hr
Pilot Purge 10,199 131 10 10,058
Assist Gas 2UM ~ 2.4 ~
TOTAL FLARED VOLUME 34,763 446 35 34,282
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Operator
BP Exploration (Alaska) Inc.
Field(s) Endicott 10450
Sa Delta North
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 107
2. Reinjected -11,833
3. Flared or vented less than 1 hour 1
4. Flared or vented greater than 1 hour 1 /
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 7
6. Used for lease operations Assist 17
Fuel 19744
7. Other
TOTAL items 1-7 8,044
8. NGL gas equivalent produced 107
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby cert~ that thf:going is true and correct to the best~ my knowledge.
Signature k::.. a. ~ Title ""'(,11, I A:X Date J D) , [ O"l,..
Form 1 0-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name voae Percent
220150
1 . Safety MCF 5ßP-
2. Lease MCF
3. Conserv. Purposes MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
10/3/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Sep-2002
Page 1
Un lanned Events less than or equal to 1 hour
TOTAL
1,489
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
Unplanned Events greater than 1 hour
9/4/2002 0900-1020 102
9/5/2002 1210-2030 631
9/6/2002 0650-1020 152
9/11/2002 1530-1730 33
9/16/2002 2050-2150 435
TOTAL 1,353
MI Compressor re-start
Booster compressor shutdown - assist gas added to keep opacity below
minimums
Booster compressor shutdown - assist gas added to keep opacity below
minimums
MI Compressor re-start
Started compressor
Restarted booster compressor
Restarted booster compressor
Started compressor
Shut down main gas compression train for high vibration. Depressurization took
longer than expected due to difficulties encountered with knock-out drum liquids. Stabilized equipment
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
TOTAL 0
5000 Mct
TOTAL 0
Volume flared less than 1 hr 1 ,489 21 1 ,467
Volume flared greater than 1,353 19 1,333
1 hr
Pilot Purge 9,870 139 7 9,724
Assist Gas 22..004. ~ 11 22..62.a
TOTAL FLARED VOLUME 35,676 503 26 35,147
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s) Endicott 10450
Delta North
Month/Year of Disposition
Oct-02
Disposition
Volume MCF*
1. Sold Fuel 0
NGL 77
2. Reinjected -5,796
3. Flared or vented less than 1 hour 1
4. Flared or vented greater than 1 hour 0
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Purge 6
6. Used for lease operations Assist 14
Fuel 11 266
7. Other
TOTAL items 1-7 5,568
8. NGL gas equivalent produced 77
9. Purchased gas
10. Transferred from:
11. Transferred to:
Signature
is true and correct to the best of my knowledge.
Title m<:.1Z.. TAx Date Itf~[óz..,.
Form 1 0-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name vOae Percent
220150
1 . Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
11/6/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT - ENDICOTT
Oct-2002
Page 1
Unplanned Events less than or equalto 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
1,212
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL 0
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mct
TOTAL 0
TOTAL 0
Volume flared less than 1 hr 1,212 30 1,181
Volume flared greater than 0 0 0 0
1 hr
Pilot Purge 10,199 252 6 9,941
Assist Gas ~ 5.9.4 M 2MQ2
TOTAL FLARED VOLUME 35,471 876 21 34,574
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator
BP Exploration
Field(s) Endicott 10450
Sa Delta North
Volume MCF*
Month/Year of Disposition
Nov-02
Disposition
1. Sold Fuel 0
NGL 66
2. Reinjected -4,600
3. Flared or vented less than 1 hour 1
4. Flared or vented greater than 1 hour 0
(Supplementat report required-oSee 20 AAC 25.235)
5. Pilot and Purge 5
6. Used for lease operations Assist 10
Fuel 9385
7. Other
TOTAL items 1-7 4,867
8. NGL gas equivalent produced 66
9. Purchased gas
10. Transferred from:
11. Transferred to:
true and correct to the best of my knowledge.
Title frLó(¿ 1'~x
Date 1-¿!t-7;/01-,
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name voae Percent
220150
1 . Safety
MCF
2. Lease
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
" .
12/4/2002
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Nov-2002
Page 1
TOTAL
2,174
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL 0
TOTAL 0
TOTAL 0
Volume flared less than 1 hr 2,174 44 2,129
Volume flared greater than 0 0 0 0
1 hr
Pilot Purge 9,870 198 5 9,667
Assist Gas 2UQ3 MZ ~ 21M2
TOTAL FLARED VOLUME 34,347 689 16 33,642
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Endicott
Field(s) Endicott 10450
Sa Delta North
Volume MCF*
Month/Year of Disposition
Dec-02
Disposition
1. Sold Fuel 0
NGL 184
2. Reinjected -9,565
3. Flared or vented less than 1· hour 2
4. Flared or vented greater than 1 hour 1 V
(Supplemental report requìred--See 20 AAC 25.235)
5. Pilot and Purge 10
6. Used for lease operations Assist 22
Fuel 21 768
7. Other
TOTAL items 1-7 12,422
8. NGL gas equivalent produced 184
9. Purchased gas
10. Transferred from:
11. Transferred to:
I hereby certify that th
Signature (I,
true and correct to the best of my knowledge.
Title fI.«s fL. -r~ Date
¡f Ja3
Form 10-422
Rev. 4/95
*Indicate contribution of each pool to total.
Pool Name voae Percent
220150
1 . Safety
MCF
/.
J~ß-
2. Lease
MCF
3. Conserv. Purposes
MCF
~. fj4J,J,"^J<f 1,./0'
Commissi er Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month folowing the month of disposition.
Authority 20 AAC 25.235.
1/6/2003
BP EXPLORATION (ALASKA) INC.
ADMINISTRATIVE APPROVAL NO. 202.4
GAS FLARING INCIDENT REPORT· ENDICOTT
Dec-2002
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME VOLUME
TOTAL 1,733
DESCRIPTION OF INCIDENT & CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
JunPlanned Events greater than 1 hour
DATE TIME VOLUME
12/11/2002 1200-1640 626
12/16/2002 0210-0530 490
12/16/2002 0030-0140 29
TOTAL 1,145
DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Reviewed operating parameters, adjust plenum temperature set point to
Booster compressor, 2nd stage flow hydrated off. prevent formation of hydrates.
Booster compressor down, plenum too cold and gas path through thin fan colers Reviewed operating parameters, adjust plenum temperature set point to
hydrated off. prevent formation of hydrates.
Booster compressor down, plenum too cold and gas path through thin fan colers Reviewed operating parameters, adjust plenum temperature set point to
hydrated off. prevent formation of hydrates.
ACTION TAKEN TO ELIMINATE CAUSE
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
o
ACTION TAKEN TO ELIMINATE CAUSE
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
TOTAL
0
TOTAL EIDR
1,733 42
1,145 28
10,199 249
22..95.9 5.6.Q
36,036 879
Volume flared less than 1 hr
Volume flared greater than
1 hr
Pilot Purge
Assist Gas
TOTAL FLARED VOLUME
SDN
2
ENDICOTT
1,689
1,116
10
9,940
22.
22..3ll
35
35,122