HomeMy WebLinkAboutKRU CPF 2 / Conoco Phillips
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2002
FACILITY: KRU CPF 2
OPERATOR: CONOCOPHILLIPS
ALASKA INC
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
PHIlLIPS ALASKA, INC.
Field(s)
KUP ARUK RIVER UNIT
MonthlY ear of Disposition
1/02
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 36,036 Pool Name Code Percent
2. Reinjected 4,851,590 KUPARUKRIVER UNIT 490100 87.64%
3. Flared or vented less than 1 hour 14,439 KUP ARUK RIVER UNIT MELTWATER 490140 1.26%
4. Flared or vented greater than 1 hour 9,250 ,,/ KUP ARUK RIVER UNIT T ABASCO 490160 0.08%
(SuDDlemental renort reouiredhSee 20 AAC 25.235)
5. Pilot and Purge 18,257 KUP ARUK RIVER UNIT TARN 490165 11.02%
6. Used for lease operations Fuel 698,824
A~~;~t 0
7. Other 0
Official Use OnlyuFlaring Authoriza1ion> 1 hr.
TOTAL items 1 - 7 5,628,396/ 1. Safety MCF
8. NGL gas equivalent produced 0 2. Lease Use ~X6 MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU CGF (LSEOR NGLS) 819,652 Úvì1JvY\Ñ-^ Qutv-l' ~ u1., / 31do'Y
CPFl 1,455,049 CornmissionQr 0
Date
11. Transferred to: 0 O~ \~(¡A l./~<;1 t1 "-
Note: All volumes must be corrected to I
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of
reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby ce, i;þ~oregoing is we and correct to the best of my knowledge. month following the month of disposition.
Authority 20 AAC 25.235.
Signature:~ït V'UAot.r J/. . Title: Supervisor Date: 2/18/01
Form 10-422 (Revised 4/95)
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS 8< CAUSE
PLANNED
UNPLANNED
ARCO ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #2
January
'to
ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
1/25/1998
05:19-15:01
1/25/1998 19:53-21:15
1/23/1998 20:35-22:32
1/14/1998 21:13-22:30
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTAL FLARED/VENTED
4,142
829
3814
465
9,250
o
9,250
14,439
o
l8.25Z
41.946
Shut down of KRU Frame 6 power generator due to extren UNPLANNED
cold temps. Ultimately resulted in the shutdown of CPF2
facility. Gas was flared to both smokeless and non-smokeless
flare systems. Non-smkls system malfunctioned - ruptured disk.
Electrical/Instrumentation malfunction
Blocked in the Ruptured disk preventing gas
from flowing to west flare.
UNPLANNED Continuation of plant upset following unplanned shutdown
Faulty shutdown of "A" GLC
UNPLANNED Restarted "A" GLC; Reduced Inlet Gas Rates
Wind swap causing GLC's to bag down because of
increased inlet temperature.
UNPLANNED Reduced inlet gas rates and shut in wells with total
of 24 mm of gas.
ALASKA OIL AND GAS CONSER V A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
PHIlLIPS ALASKA, INC.
Disposition
Volume MCF*
1. Sold
31,093
2. Reinjected
3,973,928
3. Flared or vented less than 1 hour
13,212
4. Flared or vented greater than 1 hour
Su lemental r ort r uired--See 20 AAC 25.235
1,691 -/
5. Pilot and Purge
14,194
6. Used for lease operarlons
Fuel
ssist
657,395
o
7. Other
TOTAL items 1 - 7
-/
4,691.513
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from PBU CGF (LSEOR NGLS)
CPFl
750,343
1,563,425
11. Transferred to:
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certi t oregoing is we and correct to the best of my knowledge.
Signatur
Title: Supervisor
Date: 3/18/01
Field(s)
KUP ARUK RIVER UNIT
MonthlY ear of Disposirlon
2/02
*Indicate contriburlon of each pool to total.
Pool Name Code Percent
.-,I.,.'7{¿'
KUP ARUK RIVER UNIT 490100 ~
).13
KUP ARUK RIVER UNIT MELTWATER 490140 ~
KUP ARUK RIVER UNIT T ABASCO 490160 0.18%
2.0."}
KUP ARUK RIVER UNIT TARN 490165 ~%
o
Official Use OnlynFlaring Authorization> 1 hr.
1. Safety J~q I MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
V:M^'^1 M.tJ,,). lid ~-;f ':)....YI 0 >-
Commissioner Date
ifkik
J/UIOL
o
o
o
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
PHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #2
February
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS 8< CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
2/27/2002
18:08-19:24
278
High Ambient temps.
UNPLANNED Reduced Inlet gas rates.
2/10/2002
05:79-ü6:28
1,413
Faulty shutdown on C-Gas Lift Comp. Excessive Inlet Gas UNPLANNED Reduced Inlet gas rates. Corrected E&I fluctuation
TOTAL OVER 1 HOUR
1,691
PLANNED EVENTS LESS THAN 1 HOUR
o
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
1.691
13,212
o
14.194
TOTALFLAREDIVENTED
29,097
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
PHILLIPS ALASKA, INC.
Disposition
Volume MCF*
1. Sold
31.868
2. Reinjected
5,220,689
3. Flared or vented less than 1 hour
7,911
4. Flared or vented greater than 1 hour
Su iemental re ort re uired--See 20 AAC 25.235
o
5. Pilot and Purge
17,508
6. Used for lease operations
Fuel
768,749
7. Other
o
TOTAL items 1 -7
6,046,725
8. NGL gas equivalent Dfoduced
o
9. Purchased gas
o
10. Transferred from: PBU CGP (LSEOR NGLS)
CPFl
921.330
1,320,840
11. Transferred to:
o
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Na tha used in SSEOR meter #201
I hereby certify t e fore g is true and correct to the best of my knowledge.
Title: Supervisor
Date: 4/18/01
Signature:
Field(s)
KUPARUK RIVER UNIT
MonthlYear of Disposition
3/02
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 79.66%
KUPARUK RIVER UNIT MEL TW A TER 490140 2.78%
KUPARUK RIVER UNIT TABASCO 490160 0.18%
KUPARUKRIVER UNIT TARN 490165 17.38%
Official Use Only--Flaring Authorization> 1 hr.
1. Safetv MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
Commissioner Date
Note: All volumes must be corrected to
pressure of 14.65 psi a and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTiNG INCIDENTS
CPF #2
March
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
o
o
o
7,911
o
17.508
25,419
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
PHILLIPS ALASKA, INC.
Field(s)
KUP ARUK RIVER UNIT
MonthlY ear of Disposition
4/02
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 33,760 Pool Name Code Percent
2. Reinjected 4,862,503 KUPARUKRIVER UNIT 490100 73.23%
3. Flared or vented less than 1 hour 13,714 / KUP ARUK RIVER UNIT MELTWATER 490140 5.72%
4. Flared or vented greater than 1 hour 1,118 V KUPARUKRIVER UNITTABASCO 490160 0.25%
rSunnlemental renort rt'.iluired--See 20 AAC 25.235)
5. Pilot and Purge 18,381 KUPARUK RIVER UNIT TARN 490165 20.80%
6. Used for lease operations Fuel 717,999
A~~i~t 0
7. Other 0
Official Use Only--Flaring Authorization> 1 hr.
TOTAL items I - 7 5.647.475 ./ 1. Safety /1/8 MCF
8. NOL gas eauivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU COF (LSEOR NGLS) 785,159 ( fl... 10. P. AJ' 'k ^'.-./ to/to }öy
CPFl 1,167,644 COmmiSSio!J~ 0
Date
11. Transferred to: 0
Note: All volumes must be corrected to
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of
reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby JP ;t,oing;, """ ;md """'" to !be be" of oiY know"dg', month following the month of disposition.
Signature: .. ~ n J Title: Supervisor Date: 5/17/02 Authority 20 AAC 25.235.
..J&jZ.-
Fonn 10-422 (Revised 4/95)
DATE
TiME
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
PHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARiNG OR VENTING INCIDENTS
CPF #2
April
VOLUME MCF DESCRIPTION OF INCIDENTS 8< CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
3/31/1998
04:46-06:03
4/8/1998
10:50-11 :59
21 :58-23:06
4/11/1998
14:11-15:11
$ dC>~ ?-.
TOTAL OVER 1 HOUR
431
220
210
257
1,118
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
o
33,213
Facility Maintenance; High ambient temperatures.
High ambient temperatures
High ambient temperatures
High ambient temperatures
1,118
13,714
o
18,381
Unplanned Stabilized facilty process and operations
Unplanned Reduced inlet gas rates
Unplanned Reduced inlet gas rates
Unplanned Reduced inlet gas rates
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
PHILLIPS ALASKA, INC.
Field(s)
KUPARUK RIVER UNIT
5/02
Disposition Volume MCF*
1. Sold 32,720
2. Reinjected 3,883,680
3. Flared or vented less than 1 hour 7,288
4. Flared or vented greater than 1 hour 12,027 ./
(Sunnlemental renor! rpl1uired--See 20 AAC 25.235)
5. Pilot and Purge 18,337
6. Used for lease operations Fuel 712,772
A~~i~t 0
7. Other 0
TOTAL items 1 - 7 4,666,824 ./
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 721.955
CPFl 1,567,797
11. Transferred to: 0
Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby ceJk ~~ing, is true and correct to the best of my knowledge.
Signature: ~ ,~ /, J Title: Supervisor Date: 6/18/02
Form 10-422 Revised 4/95
MonthlY ear of Disposition
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 65.00%
KUPARUK RIVER UNIT MELTWATER 490140 8.95%
KUPARUK RIVER UNIT TABASCO 490160 0.31%
KUPARUK RIVER UNIT TARN 490165 25.74%
Official Use Only--Flaring Authorization> 1 hr.
l. Safety
\",2. J 0 z.... 7 MCF ::r &e--
MCF
2. Lease Use
3. Conserv. Purposes
MCF
~ I 0,).-
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
PHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #2
May
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS 8< CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
5/13/1998 12:50-14:39 2,629 34.5 lines open. Plant load shed. Unplanned Reduced inlet gas and restarted A&C GLC.
5/15/1998 14:10-15:10 219 'A' GLC surge Controller. High ambienttemps. Unplanned Reduced inlet gas and restarted MC GLC.
5/1711998 13:52-15:44 2,713 GLC's A& B shut down on high pressure Unplanned Restarted A& B and repaired difficulties with A.
5/25/1998 16:47-17:55 687 Emergency shutdown due to bad transmitter on flash drum Unplanned Reduced inlet gas and restarted MC GLC.
LT-1020
5/25/1998 20:50-22:52 955 While shut down because of faulty L T -1020, Plant BESD was Unplanned No action taken during BESD testing of plant.
done.
5/25/1998 23:05-03: 13 4224 Start up of gas lift compressors and unidentified leakage of Unplanned Start up of gas lift compressors and unidentified
valves. leadage of valves causing flare.
5/26/1998 12:36-13:46 600 Excessive inlet g~s to facility and High ambient temps. Unplanned Shut in 5 production wells to reduce incoming
gas rate.
TOTAL OVER 1 HOUR
12,027
PLANNED EVENTS LESS THAN 1 HOUR
o
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
12,027
7,288
o
18,337
TOTALFLAREDNENTED
37,652
--
--~-
GAS FLARING or VENTING REPORT ~1J;\O~
PHILLIPS ALASKA, INC. . KUPARUI<IALPINE
--
FACILITY: CPF2 PERMIT NO.
-
GAS DISPOSITION
Dat.. <If Occurrence: 5/26/2002 o Flare Dvent Time of Occurrence:
(mmJdd/yy) (Check Selection) 00:00 ~ Minutes
From: ~ To: ~ '" 01:08
Ú.tal Volume Flared or Vented: ~ MSCF BBlS From: To: - '"
- -
From: - To: - =
! I From: To: - =
-
Meter No. ( By Facility) Total Minutes Flared or Vented = 01:08
(Includes volume flared which generated black smoke, If applicable)
A. O,,~ç¡iþûl>n ~t Incident and Cause: (Check as manr as needed to fully describe the incident)
-- SID T/CR - for - Process upset in
T/C SD due to high exhausltemperature saction of facilitr
Seal oii system ditficuUie.s Flering for driUsite shutdOwn / startup
X EMERGENCY SHUTDOWN Rare system testing
Electrical/Instrumentation malfunction FauJly shutdown en
Electrical I Instrumentation maltunclion Facility maintenance
at other facility (T&D) High ambient temperatures.
Gas tlansit system overpressure SID on high vibration
backing CPFIRow Station out X Other: ESD plant due to bad transmitter
Excessive I iosutficient Inlet gas on flash drum l T·1 020
rates into facility
a. AcUcm Taken to Eiirnit\8te Cause and Prevent Recunenee: (Check and describe as applicable)
Started / restarted TIC iI Stabilized facility process and operation
Compressor I train depressured Repaired equipment ditticulties
X Reduced I increased Inle1 gas rates wíth
Completed flare testing FaciJity maintenance completed
Corrected E&I fluctuation I failure Other:
-- Corrected E&J fluctuation / failure
at other facility (T&D)
C. Flaring or Venting was: (Check one)
0 necessary for facility operations, repairs, upgrades, or testing procedures 0 an emergency that threatened life or property
,"~,,~. 0 necessarv to Drellent loss of ultimate reeoverv
-"._. "'
Ventlnq Incident
W..s th.. voluml¡ over 1 ,000 msef? Ves: 0 No: 0 (If Yes,complete form and contact FEC immediately).
- .,,-' . ~"~""'."~'""-'~
Flare Incident TRUE
,....
Did incidant last for longer than 1 hour? Yes 0 No 0
II Yes, tax this report to FEC within 24 hours 659-7712. 0 0
Did incident cause black smoke (3 minutes in 1 hr)? Yes: No:
Ii Vel!. I¡,x this n,pc>l1Ia ADEC immediately 907/269-7508 and notify FEC.
Bjack smoke emilled 1rom source: (enler tag number and description)
O,Üó aflu time of black smoke event: From: To:
Volume flared which generated black smoke: MSCF - B8lS
DescJÌplíon of steps to minimize emissions: (Section B above)
Maì¡,tial tlared: Gas: NGls: Other:
General Weather. Air Temperature: Wind Speed/Direction:
N¡,me and phone number of person making the report:
Name Phone No,
-- ,.--
Based on ¡(formation and belief formed after reasonable inquiry, I certify that the statements and information In and attached to this
document are true. accurate and complete.
Facility Supervisor i!Z4:111'/0rðL {fð>¡. fl12:'W'~ale 5/2712002
cc: Alpine: Field Environmenfal Compliance Coordinators, ALP-14 (FlareNent & Black Smoke Incidents)
Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (FlareNent & Black Smoke Incidents)
Upd<;¡loc.i: FEC 1/02
P:\Grôups\HSE1\Envitonmental Help\Fam'lS\
Z-d
ZIU,-SSS
(¿OS)
1~+U~WUO~1^U3 ~n~~dn~
dSl:~O ~O ¿~ ¡::;~W
~--
~-~
--
.-.-.-
GAS FLARING or VENTING REPORT
PHILLIPS ALASKA, INC. . KUPARUKJALPINE
FACiliTY:
CPF2
PERMIT NO.
GAS DISPOSITION
(mm/dd/yy)
o Flare 0 Vent
(Check Selection)
lime
QQ;QQ
~
of Occurrence;
24:00
To: ~
To:
To:
To:
Minutes
02:02
Oat.. 01 Occurr",nce:
5126/2002
Tota' Volume Flared 0' Vented:
~MSCF
BBlS
From:
From:
From:
From:
Meter No.
( By Facility)
Total Minutes Flared or Vented
'"
02:02
(includes volume flared which generated black smoke, It applicpble)
A Description of Incident and Cause: (Check as many as needed to lully describe the Incident)
SID T/C# for
TIC SD due to high exhaust temperature
Seal oil system difficuhies
EMERGENCY SHUTDOWN
Electrical I Instrumentation malfunction
Electrical ¡Instrumentation maJIunclion
al other lacility (T&D)
Gas transit system O\Ierpressure
backing CPFIFlow Station out
Exc&ssiva I ¡nsofficienl inial gas
rates Into lacUity
x
Process upsettn
section of facil~y
Flaring for drillsh. shutdOwn I startup
Flare system lesting
Faully shutdown on
Facility maintenance
High ambient temperatures.
SID on high vibration
Olher: while the plant was down due to
ESP d I L T-1020 we did a
la.IiíiI!e ich resulted in this
--volume of flare
~çsþ
6. Act;ûn Takòl1 to Eliminate Cause and P,avent Recurrence: (Check and ducrlbe as applicable)
Started J restarted TIC /I
Compressor / train depressurod
Reduced I increased inlet gas rates
Completed flare testing
Corrected E&I fluctuation I failure
Correded E& I fluctuation I failure
at other facility (T&D)
x
th
--
--
C. flaring or V..nting was: (Check one)
o necessary for facility operations. repairs, upgrades, or testing procedures
o necesser to revent ioss of ultimate recove
o an emergency thallhreatened life or property
Ventina Incident
Was the vCJ'ume ouer 1,000 msc'?
Yes;
o
No:
o
(1/ Ves,compJete form and contact FEC immediately).
Flare Incident
TRUE
Did inddent last for longer than 1 hour? Ves 0 No 0
If Ye$, ta)! this 'epart to FEC within 24 hours 659-7112.
Díd indo"llt cause black smoke (3 minutes in 1 hr)? Yes: 0 No~ 0
II Yes, í",¡¡ this report to ADEC immediately 9071269-7506 and notify FEC.
Black smoke emitlad from source: (enter tag number and descnpUon)
Datê and lime at black smoke event: From: To:
VLilume flared which generated black smoke: MSCF B8lS
P~$cription of steps to minimize emissions: (Section B above)
MateliáJ flared: Gas: NGLs: Other:
¡;¡"n"ral Weather: Air Temperature: Wind Speed/Direction:
Name and phone number of person making the report:
Name Phone No.
BáS6j on Information and belief formed after reasonable inquiry, I certify that the sta1ements and information in and attached to this
dOCUI1\611t are true. accu~ ~nd complete. ~
"'¡cIlIlV Supervisor liZ:!::!!ljlU)~¡:2'fJt ß~ J~ Date 5/27/2002
cc: Alpine: Field Environmental Compliance Coordina ors. Alp·14 (FlarelVent & 81ack Smoke Incidents)
KuparuK: Field Environmen1aJ Compliance Coordinators, NSK 61 (FlarelVent & Black Smoke Incidents)
Updatt;:d: F.ËC 1í02
P;\GroupsIHSET\Environmenral HeipIForme\
c-d
~1l..¿-6SS
(l..06)
le+uawuo~~^U3 ~n~edn~
d9t:~0 ~O l..~ ~ew
GAS FLARING or VENTING REPORT
PHilLIPS ALASKA, INC. . KUPARUKlAlPINE
FACILITY: CPF2 PERMIT NO.
-~-
GAS DISPOSITION
Ollte of Occunence: 5126/2002 o Flare o Vent Time of Occurrence:
(mrn/ddlyy) (Check Selection) 00:00 ~ Minutes
From: ~ To: ~ '" 04:08
Total Vulume Flared or Venled: ~ MSCF - eelS From: - To: - ~
From: - To: - '"
L::ter No. / From; - To; - '"
( By Facility) Total Minutes Flared or Venled ;;; 04:08
(Includes volume flared wmch generated black smoke. if applicable)
A. Dð"",lpüon 01 Incident and Cause: (Check as many as needed to fully describe the ¡ncldenl)
SID T/C# - for - Process upset In
TIC SD due to high exhaust temperature section of facility
Seal oil system rufficuhies Flaring for draIsite shutdownJ startup
EMERGENCY SHUTDOWN Flam system testing
Eleclrical J Instrumentation maHunction Faully shutdown on
EleclricaJ Ilnslrumentatjon malfunction Facilily maintenance
at ather facility (T&OJ High ambient temperatures.
Gas transit system overpressure SID on high lIibration
backing CPF/Aow station out X Other: Start up of Gas un compressors
Excessille I insuHicle rAlnlel gas and unidentified leakage of
rales into facilily lIallles
8. Action nk..n to eliminate Cause and Prevent Recurrence: (Check and describe.s applicable)
Started I restarted TIC It Stabilized facility process and operation
Compressor J train depressured Repaired equipment dilficu/ties
Reduced I increased Inlet gas rates with
Completed flare testing Facility maintenance completed
Corrected E&I fluctuation 1 failure X Other: start-up 01 gas compressors
Corrected E&I fluctuation I failure and Identified val lies that were
at olher facility (T&D) leaking to flare
C. Flaring or Venting was: (Check one)
0 necessary for facility operations. repairs, upgrades. or testing procedures 0 an emergency that threatened life or property
0 necessarY 10 oreventloss of ultimate recoverY
.u...... .~".,_.
Ventin!llncident
Was the 1/olume oller 1,000 macl? Yes: 0 No: 0 (II Yes,complele form and contact FEC immediately).
_. _."...__n_-'"" ..
Flare Incident TRUE
.. _.".~..- - .. _...~..~.-_."....._...,
Did incident last lor longer than 1 hour'? Yes 0 No 0
If Y"s, till( this report to FEC within 24 hours 659-7712. 0 2)
Did incident caUSE: black smoke (3 minutes In 1 hr)? Yes: No:
It V¡'í>, f..¡¡ this repc1 to ADEC Immediately 9071269·7508 and notify FEC.
Bleck smoke emitted from source: (enter tag number and desc,iption)
0",11; and time of black smoke ellent: From: To:
Volume flared which generated black smoke: MSCF - BBLS
De.cliptioll of steps 10 minimize emissions: (Section B abo1/e)
Material flared: Gas; NGls: Other:
G..nE:r<¡1 Weather: Air Temperature: Wind Speed/Direction:
Namt! and phone number of person making the report:
Name Phone No.
-. .._....'~ -~ -
Based on information and belief formed after raasonable inquiry. I certify thallhe statements and information in and attached to this
document are true. accurate and complete. .
F&cUity Supervisor J{JÚ/J1J/~ (&z. fJ"L.-v~ b~ JDBte 5127/2002
cc: Alpine: Field Environmental Compliance Coordinators. AlP-14 (FiareNent & Black Smoke Incidents)
Kuparuk: Field Enllironmental Compliance Coordinators, NSK 61 (FlareNent & Black Smoke Incidents)
up".'."; FEC 1/02
P:\Groups\HSET\Environmenlal Hatp\Form::¡¡\
v·d
~IL¿-SSS
(¿OS)
1~~uaWUO~1^U3 ~n~~dn~
d91:~O ~O L~ h~.,
CPF2 MAY 26TH AND 27TH FLARING EVENTS SUMMARY
. The first flare event at CPF2 started at 16:47 on 5/25/2002 and lasted 1 hr. 8 min.
This was the result of an operator initiated facility-wide emergency shutdown (ESD)
due to a defective level transmitter on the crude flash drum. All production from
CPF2 was shut down at that time and all CPF2 drill site wells were shut in.
.. The second flare event started at 20:50 and lasted 2 hr. 2 min. This was the result of
a facility-wide blowdown emergency shutdown (BESD) and restart of the gas
compressors.
Note: One hour of the flare event can be attributed to the Facility BESD Test. This
test has to be performed every 3 years (it has been 2 years since our last test), and
we decided to do it while the facility was shutdown because we anticipated that the
instrumentation repairs necessary to bring the facifity back on line would take longer
than the duration ot the test.
.. The third flare event started at 23:05 and lasted 4 hr. 8 min. This was the result of
the continued start up of the gas compressors and valves venting to the flare system.
These flaring events were a result of an emergency shutdown and subsequent restart of CPF2
and could not have been avoided.
5"'"
21U.-6SS
Cl.06 )
le~uaWUOJ~^U3 ~nJedn~
dSl:20 20 ¿2 ~e..J
Hea Ith, Environment, Safety, Training. and Emergency Services
P. O. Box 196105, NSK·45
Anchorage, AK 99510-0360
Phone: (907) 659-7593
Fax: (907) 659-7861
Fax
To:
Fax:
5-1 eu t.. (Iì ¿ me, ¡'''' S'
From:
Phillips Alaska, Inc;.
J~- /1 >;¡ /'.-'/~Z
)_ 2 -}.. dOL
5'
Phone:
Date:
Pages:
Re:
cc:
o Urgent
ø For Review
o Please Comment 0 Please Reply
o Please Recycle
-Comments:
¡ . d
cnU,-6SS
\,
£l,D6 )
t~~UaWUO~~^U3 ~n~~dn~
ds¡:aD aD ¿a ¡::;~w
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
PHILLIPS ALASKA, INC.
Disposition
Volume MCF*
I. Sold
34.431
2. Reinjected
4,392,993
3. Flared or vented less than 1 hour
7,083
5. Pilot and Purge
17,322
6. Used for lease operations
Fuel
722,372
7. Other
TOTAL items I - 7
5,174,201
8. NGL gas eauivalent produced
9. Purchased gas
10. Transferred from: PBU CGF (LSEOR NGLS)
CPFl
713,267
1,026,122
11. Transferred to:
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Na tha used in SSEOR meter #201
I hereby certify t for ing is true and correct to the best of my knowledge.
!/
Title: Supervisor
7/19/2002
."-,,
Field(s)
KUPARUKRIVER UNIT
MonthlY ear of Disposition
*Indicate contribution of each pool to total.
Pool Name
KUP ARUK RIVER UNIT
KUPARUK RIVER UNIT MELTWATER
o KUPARUKRIVER UNIT TABASCO
KUPARUKRIVER UNIT TARN
o
Official Use Only--Flaring Authorization> 1 hr.
1. Safetv
o
2. Lease Use
o
3. Conserv. Purposes
6/02
Code Percent
490100 87.78%
490140 3.15%
490160 0.12%
490165 8.95%
MCF
MCF
MCF
Commissioner
Date
o
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
PHILLiPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #2
June
DATE
TIME
VOLUME MCF DESCRIPTiON OF INCIDENTS & CAUSE
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
TOTAL OVER 1 HOUR
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
7,083
o
17,322
24,405
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
PHIlLIPS ALASKA, INC.
Field(s)
KUPARUK RIVER UNIT
7/02
Disposition Volume MCF*
1. Sold 33,039
2. Reinjected 4,596,995
3. Flared or vented less than 1 hour 14,020
4. Flared or vented greater than 1 hour 11,847
rSunnIemental renor! reauired--See 20 AAC 25.235)
5. Pilot and Purge 18,327
6. Used for lease operations Fuel 729,080
A,~i~t 0
7. Other 0
TOTAL items 1 - 7 5,403,308
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 720,401
CPFl 873,864
11. Transferred to: 0
Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby certify ~at th~Z.0i~g is true and correct to the best of my knowledge.
Signature: J: j(; J À · ... J Title: Supervisor 8120/2002
Form 10-422 (RevIsed 4/95)
MonthlY ear of Disposition
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUP ARUK RIVER UNIT 490100 73.91 %
KUPARUK RIVER UNIT MELTWATER 490140 7.29%
KUPARUKRIVER UNITTABASCO 490160 0.33%
KUPARUK RIVER UNIT TARN 490165 18.47%
Official Use Only--Flaring Authorization> 1 hr.
1. Safety 1(,347 MCF
2. Lease Use MCF
3. Conserv. Purposes MCF
~Á ~ q )( ,,)0.3-
Commissione Date
3<3¡c-
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
PHILLIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
7/16/2002 08:40 - 09:47 187 C2-1 01 A shutdown due to ambiant related seal oil problems Unplanned Reduced inlet gas and stabilized facility process & operation
7/16/2002 19:00·21:19 3,207 1 st stage bal piston switch failure causing C2-102 to trip Unpianned Reduced inlet gas and correctedE&1 fluctuation/failure
7/2312002 18:26 - 20:23 3,752 Load Shed due to Frame 6 shutdown Unpianned Reduced inlet gas, corrected E&I fluctuation and restarted
7/25/2002 20:48 - 22:05 635 Electrical Instrument malfunction/Excessive Inlet gas Unpianned Reduced Inlet gas rates
7/2512002 12:33 . 18:05 3514 Emergency shutdown due to Electrical malfunction Unplanned Total shutdown of aSD Plant
7/29/2002 17:09 - 18:15 552 Shutdown due to Instrumentation malfunction Unpianned Replaced manual block PIC - 1108
TOTAL OVER 1 HOUR
11,847
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
11,847
TOTALFLAREDNENTED
44,194
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT 9F PRODUCED GAS DISPOSITION
MonthlY ear of Disposition
Facility
CENTRAL PROCESSING FACILITY #2
Operator
PffiLLIPS ALASKA, INC.
Field(s)
KUPARUKRIVER UNIT
8/02
Disposition Volume MCF*
1. Sold 35,926
2. Reinjected 4,957,643
..
3. Flared or vented less than 1 hour 10,109
4. Flared or vented greater than 1 hour 978 ¡./
{Sunnlemental renort reouired--See 20 AAC 25.235\
5. Pilot and Purge 18,862
6. Used for lease operations Fuel 742,927
A~~i~t n
7. Other 0
TOTAL items 1 - 7 5,766.445
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: PBU CGF (LSEOR NGLS) 686,385
CPF1 697,662
11. Transferred to: 0
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR
reflected on line 10 or Naptha used in SSEOR meter #201
I hereby :~ the foregoing is true and correct to the best of my knowledge.
\ U.l..ß. /~~ ~I$
Signature: ...... . , Title: Supervisor.. 9/2012002
FOnTI 10-422 (Revised 4/95) Y
*Indicate contribution of each pool to total.
Pool Name Code Percent
KUPARUK RIVER UNIT 490100 73.39%
KUPARUK RIVER UNIT MELTWATER 490140 7.25%
KUPARUK RIVER UNIT TABASCO 490160 0.33%
KUPARUK RIVER UNIT TARN 490165 19.03%
Official Use On1y--Flaring Authorization> 1 hr.
1. Safety
9 7ß MCF :JtS1L
2. Lease Use
MCF
3. Conserv. Purposes
MCF
,/
hI )
~
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60 degrees F. Report due by the 20th of the
month following the month of disposition.
Authority 20 AAC 25.235.
DATE
TIME
PHII¡;LIPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
VOLUME MCF DESCRIPTION OF INqlDENTS & CAUSE
8/21/1998
1641-1806
8/24/1998
1155-1337
TOTAL OVER 1 HOUR
373
Shutdown due to electricaVinstrumental malfunction
Startup of new C2-101D GLC and had mechanical and
instrument problems with flare valves
605
978
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTAL FLAREDNENTED
o
29,949
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Reduced inlet gas, stabilized facility process and
Unplanned operation and started up NGL ESP's.
Repaired equipment difficulties with C2-1 01 D and
Unplanned performed maintenance on the vent to flare valves.
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility joperator Ifield(S) I MonthlY ear of Disposition
CENTRAL PROCESSING FACILITY #2 PHILLIPS ALASKA, INC. KUPARUKRIVER UNIT 9/02
Disposition ¡ Volume MCF* *Indicate contribution of each pool to total.
,
1. Sold 32,209 Pool Name Code Percent
2. Reinjected 5,028,291 KUPARUK RIVER UNIT 490100 87.13%
3. Flared or vented less than 1 hour 13,220 KUPARUK RIVER UNIT MELTWATER 490140 2.97%
4. Flared or vented greater than 1 hour 12,392 KUPARUKRIVER UNITTABASCO 490160 0.11%
(SuDD1emental reDort reauired--See 20 AAC 25.235)
5. Pilot and Purge 20,695 KUPARUKRIVER UNIT TARN 490165 9.79%
6. Used for lease operations Fuel 684,077
A ~~i~t 0
7. Other 0
Official Use Only--Flaring Authorization> 1 hr.
TOTAL items 1 - 7 5,790,884 1. Safety '\ 2£ 31 ¿~, MCF
8. NGL gas eouivalent produced 0 2. Lease Use MCF
¡
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU CGF (LSEOR NGLS) , 711.323 (W"~~J,J: ~ /ðf¡ ð- D>-
CPFl 768,665
COmnusSlO Date
11. Transferred to: 0
Note: All volumes must be corrected to
Remarks: Reinjected vol does not include volumes ofPBU NGLS ~quired for LSEOR pressure of 14.65 psia and to a temperature of
reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereb:J«king is true and correct to the best of II¡ly knowledge. month following the month of disposition.
S· -'. : /.n:. ·tl S· f1z 02 Authority 20 AAC 25.235.
Ignatur' ., , TI e: upervIsor 0/20
~-
Fonn 10-422 (RevIsed 4/95)
PHilLIPS ALASKA, INC.
CONSE~VATION ORDER NO. 219
GAS
DATE
TIME
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
'f/:f¡ 11998 1612-1729 313 Leaking 2nd stage vent to flare was discovered Unplanned Shut in GLC C2-1 01 D and repaired bad equipment
Electrical problems to ¢2-101O. C2-101A & C2-101B also
9~1998 2305-0008 4,807 tripped from surge events. Unplanned Reduced gas rates and restarted C2-101A & C2-101B
~ 9r998 1118-1235 336 Shut in due to high am~iant tempuretures Unplanned Reduced inlet gas. Shut in 8 production weils.
9 {1998 1255-1411 1,023 Shut in due to Gas lift 9ompressor Unplanned Shut in 13 production weils to reduce inlet gas.
I Reduced inlet gas. Shut in 68 pl'lScfd of gas. Restart
9/2i}'1998 0908-1128 5,913 In plant load shed due ro electrical power supply trouble Unplanned Gas handling equipment. MA.
TOTAL OVER 1 HOUR
12,392
PLANNED EVENTS LESS THAN 1 HOUR
o
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Piiot and Purge
12,392
TOTALFLAREDNENTED
46,307
-
c:>
I
c.>
c:>
I
""
c:>
c:>
""
c:>
""
en
'"
3
PHILUPS ALASKA, JNC.
CONSERVATjON ORDER NO. 219
GAS FlARING OR VEHTlNG INCIDENTS
CPF #2
·-sePte~;; ;
......
~
CI
3
I
.....
::J:
..-
..-
.....
en
:>-
^
;æ:
n
ACTjON TAKEN TO EUMINATE CAUSE
PLANNED
UNPLANNED
DATE TIME VOLU1J E MCF DESCRIPTION OF INCIDENTS & CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUf¡
repaired Dad eq~ment
Reducec:l gas fates and re-slañed C:?-1 01 A & C2-1 01 B
Reduced Inlet gas. Shu1 in 8 prooumiOn \vells.
Sltut in 13 production wells 10 reduĊ Inlet gas.
Reclucecl inlet gas. Shulln 68 nnscfd of !las. fie
Ga.s handling equipment
start
Shut in GLC C2-101 D and
Unplal'lned
Unplanned
Unplanned
Unplanned
Unplann&d
leaking 2nd stage van! to lIare was discovered
C2-101A & C2·101B also
In piant road shed due ¡o eledirical power supply trouble
Elec!rical problems 10 C2-101D.
tripped from surge evenls.
Shulln due to hiah anbianllempurelures
ShlJl In due to Gas Iif CompresS[}1
313
4,807
335
1,023
5,913
1ß12-1729
2.'305-0008
1118-1235
1255-1411
0908-1128
91100:>2
9I29.i2002
9,12/2002
9,1-412002
!t1'9l2OO2
12,392
TOTAL OVER 1 HOUR
CD
c:>
.....
""
en
<:n
en
<:n
.....
.þ.
12,392
1$~¡!-'~
:. ~ 0'
20..6!J~
HOUR
o
PLANNED EVENTS LESS THAN
Flare or Vent Volumes;
Grea1el Ulan 1 hour
less th6111 hour
CoIIlinuous Assisl
Pilot ane! Purge
TOTAL fLAfiEDNENTEÐ
-t
I
CD
en
CD
.....
c:>
c:>
""
........
c:>
c:>
""
......
I
CD
c.>
CD
j
?:
'ilL
rC
RE""(
, -- -~,. --..
46,307
AliS~~~¡dcG4lb("0It.':, .O"¡¡W~!i1
A!1';:~1'OOf;
,,¡
~
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
CONOCOPHILLIPS ALASKA, INC.
Field(s)
KUPARUK RIVER UNIT
MonthlY ear of Disposition
10/02
Disposition Volume MCF* *Indicate contribution of each pool to total.
1. Sold 35,571 Pool Name Code Percent
2. Reinjected 5,667,727 KUPARUK RIVER UNIT 490100 88.38%
3. Flared or vented less than 1 hour 2,027 KUP ARUK RIVER UNIT MEL TW A TER 490140 2.99%
4. Flared or vented greater than 1 hour 2,322 V KUPARUK RIVER UNIT TABASCO 490160 0.14%
(SuoolementaI renor! reouirednSee 20 AAC 25.235)
5. Pilot and Purge 22,480 KUPARUK RIVER UNIT TARN 490165 8.49%
6. U sed for lease operations Fuel 697,556
A ~~i~t 0
7. Other 0
Official Use Only--Flaring Authorization> 1 hr.
TOTAL items 1 -7 6.427.683 1. Safetv 2 3ZZMCF
(
8. NOL gas eauivalent oroduced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU COF (LSEOR NOLS) 779336 (n"I' ,('), ^ ¡ .1' ~, 1", lõt".>lù)..-
CPFl 425,403 commissiQer IJ
Date
11. Transferred to: 0
Note: All volumes must be corrected to
Remarks: Reinjected vol does not include volumes of PBU NOLS aquired for LSEOR pressure of 14.65 psi a and to a temperature of
reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition.
Signature: ~ ~ Authority 20 AAC 25.235.
Title: Supervisor 11120/2002
JP~
Form 10-422 (Revised 4/95)
,
DATE
TIME
PLANNED
UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
CONOCOPHILLiPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #2
October 2002
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
10/7/2002
0016-0213
TOTAL OVER 1 HOUR
2,322
2,322
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
o
2,322
2,027
o
22.480
26,829
"D" GLC shutdown vibration problem
\.
Unplanned Reduced gas rates
-{
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
CONOCOPHILLlPS ALASKA, INC.
Field(s)
KUP ARUK RIVER UNIT
MonthlY ear of Disposition
11102
Disposition Volume MCF* *Indicate contribution of each pool to total.
I. Sold 31.552 Pool Name Code Percent
2. Reinjected 4,442,923 KUPARUK RIVER UNIT 490100 89.35%
3. Flared or vented less than I hour II, 799 KUPARUK RIVER UNIT MELTWATER 490140 3.65%
4. Flared or vented greater than I hour 5,822 C/ KUPARUKRIVER UNITTABASCO 490160 0.07%
ISunolementaI renort reouired--See 20 AAC 25.235)
5. Pilot and Purge 22,813 KUPARUK RIVER UNIT TARN 490165 6.93%
6. Used for lease operations Fuel 667,758
A..iot 0
7. Other 0
Official Use Only--Flaring Authorization> 1 hr.
TOTAL items 1 - 7 5.182,667 I. Safetv ~ <ð 2;7- MCF
8. NGL gas equivalent Dfoduced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU CGF (LSEOR NGLS) 697,112 Ú~ \C1-JvJ.- ~t I ?'(.J.- -ria _
CPFl 1,047,057
CommissOner Date
11. Transferred to: 0
Note: All volumes must be corrected to
Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of
reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition.
Signature: 77 ttlf.~ IVth/2002 Authority 20 AAC 25.235.
Title: Supervisor
<íBf-
Form 10-422 (Revised 4/95)
DATE
TIME
CONOCOPHiLLlPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #2
November 2002
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
FLARiNG OR VENTING EVENTS GREATER THAN 1 HOUR
11/5/1998 1143-1252
11/5/1998 1517-1645
11/6/1998 0014-0121
111711998 1011-1154
11/11/1998 1951-2056
11/23/1998 0517-0704
TOTAL OVER 1 HOUR
1,406
890
283
2,799
242
202
5,822 V
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Voiumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
o
~~~)
22.813
~I "W \!JV.A~'þ~ -h'-~~'-I-o I 1'1.. \
vu (ìl.I.~ IO-z--- }t \ b ç :.--)
Q) &;\I~y,g..~L
~)
Flaring for drillsite shutdown/startup; faulty shutdown on
11/3/02- TAPS sId; facility restart following earthquake-
motivated shutdown
Flaring for drillsite shutdown/startup; faulty shutdown on
11/3/02-TAPS sId; tacility restart following earthquake-
motivated shutdown
Excessive!ìnsufficient inlet gas rates into facility; restarting
Prudhoe Bay NGL Plant shutdown
Excessive!ìnsufficient inlet gas rates into facility; process
upset in gas process section of facility; B GLC went
down due to first stage pressure
Excessive!ìnsufficient inlet gas rates into facility
Excessive!ìnsufficient inlet gas rates into facility; high
ambient temperatures; PV-11 08 valve leakage
40,434
PLANNED
UNPLANNED
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
Unplanned
ACTION TAKEN TO ELIMINATE CAUSE
Reduced!ìncreased inlet gas rates; stabilized
tacility process and operation
Reduced/increased inlet gas rates; stabilized
facility process and operation
Stabilized tacility process and operation; completed
satety purging of equipment
Reduced!ìncreased inlet gas rates; stabilized
facility process and operation; B Gas Lift comp
started on second attempt
Stabilized facility process and operation
Reduced!ìncreased inlet gas rates; stabilized
tacility process and operation; leolated PV-1108
and will repair
I'·. I s\.vJ\-t.11 Vv"'-£
reYlkkc.l
.
()F- 'T-¡:Jk;..
Jßf!-. .
I Z{ n ( J z.-
"
ALASKA OIL AND GAS CONSERV A TION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
CENTRAL PROCESSING FACILITY #2
Operator
CONOCOPHILLIPS ALASKA, INC.
Field(s)
KUPARUK RIVER UNIT
MonthlY ear of Disposition
12/02
Disposition Volume MCF* *Indicate contribution of each pool to total.
I. Sold 34,327 Pool Name Code Percent
2. Reinjected 5,115,957 KUPARUK RIVER UNIT 490100 88.81%
3. Flared or vented less than 1 hour 28,717 KUPARUK RIVER UNIT MELTWATER 490140 3.61%
4. Flared or vented greater than 1 hour 8,544 /' KUPARUK RIVER UNIT TABASCO 490160 0.06%
(Suoolemental renort reouired-·See 20 AAC 25.235\
5. Pilot and Purge 23,819 KUPARUK RIVER UNIT TARN 490165 7.52%
6. Used for lease operations Fuel 757,047
A«ist 0
7. Other 0
Official Use Only--Flaring Authorization> 1 hr.
TOTAL items 1 - 7 5.968.411 1. Safetv S544- MCF
)
8. NOL !!:as eauivalent produced 0 2. Lease Use MCF
9. Purchased gas 0 3. Conserv. Purposes MCF
10. Transferred from: PBU COF (LSEOR NOLS) 879.329 (å11AJnA..A In) /'.1' ~. . '^' õ/lO/ð:3
CPFI 1,529,000 Commissibher 0
Date
II. Transferred to: 0
Note: All volumes must be corrected to
Remarks: Reinjected vol does not include volumes of PBU NOLS aquired for LSEOR pressure of 14.65 psia and to a temperature of
reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the
I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition.
Signature:~ Authority 20 AAC 25.235.
Title: Supervisor 1/20/2003
3~ß-
Fonn 10-422 (Revised 4/95)
DATE
TIME
CONOCOPHILLlPS ALASKA, INC.
CONSERVATION ORDER NO. 219
GAS FLARING OR VENTING INCIDENTS
CPF #2
December
VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE
FLARING OR VENTING EVENTS GREATER THAN 1 HOUR
12/22/1998 1711-1821
12/22/1998 1836-2243
12/24/1998 0232-0345
12/24/1998 0716-0842
12/26/1998 0354-0801
12/28/1998 0503-0605
TOTAL OVER 1 HOUR
3,766
2,802
223
1,504
187
62
8,544
PLANNED EVENTS LESS THAN 1 HOUR
Flare or Vent Volumes:
Greater than 1 hour
Less than 1 hour
Continuous Assist
Pilot and Purge
TOTALFLAREDNENTED
o
8,544
28,717
o
23.819
61,080
Electrical/instr. malfunction; excessive/insufficient inlet
gas rates into facility; process upset in gas and oil
suction of facility; due to CPF-1 generator shutdown
Electrical/instrum. Malfunction at other facility; Excessive/
insuff. Inlet gas rates into facility; process upset in gas &
oil section; start-up problems with gas compressors
Process upset in LSEOR section of facility
SID T/Cs C2 101 B for high pressure; excessive/insufficient
inlet gase rate into facility; process upset in gas section
of facility
SID T/C C2-1 01 B for fuel gas problems; process upset in
gas
Excessive inlet gas rates into facility; process upset in
gas; C2-1 01 B s/o on high pressure
\.
J
PLANNED
UNPLANNED
ACTION TAKEN TO ELIMINATE CAUSE
Unplanned Reduced/increased inlet gas rates; stabilized
facility process and operation; repaired equipment
diff. w/ compressors; shut-in inlet manifold
Unplanned Reduced/increased inlet gas rates; stabilized
facility process & operation; repaired compressors;
located source of flare & decreased gas load
Unplanned Reduced/increased inlet gase rates; stabilized
facility process and operation
Unplanned Started/restarted T/C C2-101B; S/110 mmscf gas
on 2V pad
Unplanned Reduced/increased inlet gas rates; shut in 80 mmscf
gas
Unplanned Started/restarted C2-1 01 B; stabilized facility