Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutKRU CPF 2 / Conoco Phillips STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2002 FACILITY: KRU CPF 2 OPERATOR: CONOCOPHILLIPS ALASKA INC ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator PHIlLIPS ALASKA, INC. Field(s) KUP ARUK RIVER UNIT MonthlY ear of Disposition 1/02 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 36,036 Pool Name Code Percent 2. Reinjected 4,851,590 KUPARUKRIVER UNIT 490100 87.64% 3. Flared or vented less than 1 hour 14,439 KUP ARUK RIVER UNIT MELTWATER 490140 1.26% 4. Flared or vented greater than 1 hour 9,250 ,,/ KUP ARUK RIVER UNIT T ABASCO 490160 0.08% (SuDDlemental renort reouiredhSee 20 AAC 25.235) 5. Pilot and Purge 18,257 KUP ARUK RIVER UNIT TARN 490165 11.02% 6. Used for lease operations Fuel 698,824 A~~;~t 0 7. Other 0 Official Use OnlyuFlaring Authoriza1ion> 1 hr. TOTAL items 1 - 7 5,628,396/ 1. Safety MCF 8. NGL gas equivalent produced 0 2. Lease Use ~X6 MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU CGF (LSEOR NGLS) 819,652 Úvì1JvY\Ñ-^ Qutv-l' ~ u1., / 31do'Y CPFl 1,455,049 CornmissionQr 0 Date 11. Transferred to: 0 O~ \~(¡A l./~<;1 t1 "- Note: All volumes must be corrected to I Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby ce, i;þ~oregoing is we and correct to the best of my knowledge. month following the month of disposition. Authority 20 AAC 25.235. Signature:~ït V'UAot.r J/. . Title: Supervisor Date: 2/18/01 Form 10-422 (Revised 4/95) DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8< CAUSE PLANNED UNPLANNED ARCO ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 January 'to ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 1/25/1998 05:19-15:01 1/25/1998 19:53-21:15 1/23/1998 20:35-22:32 1/14/1998 21:13-22:30 TOTAL OVER 1 HOUR PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTAL FLARED/VENTED 4,142 829 3814 465 9,250 o 9,250 14,439 o l8.25Z 41.946 Shut down of KRU Frame 6 power generator due to extren UNPLANNED cold temps. Ultimately resulted in the shutdown of CPF2 facility. Gas was flared to both smokeless and non-smokeless flare systems. Non-smkls system malfunctioned - ruptured disk. Electrical/Instrumentation malfunction Blocked in the Ruptured disk preventing gas from flowing to west flare. UNPLANNED Continuation of plant upset following unplanned shutdown Faulty shutdown of "A" GLC UNPLANNED Restarted "A" GLC; Reduced Inlet Gas Rates Wind swap causing GLC's to bag down because of increased inlet temperature. UNPLANNED Reduced inlet gas rates and shut in wells with total of 24 mm of gas. ALASKA OIL AND GAS CONSER V A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator PHIlLIPS ALASKA, INC. Disposition Volume MCF* 1. Sold 31,093 2. Reinjected 3,973,928 3. Flared or vented less than 1 hour 13,212 4. Flared or vented greater than 1 hour Su lemental r ort r uired--See 20 AAC 25.235 1,691 -/ 5. Pilot and Purge 14,194 6. Used for lease operarlons Fuel ssist 657,395 o 7. Other TOTAL items 1 - 7 -/ 4,691.513 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from PBU CGF (LSEOR NGLS) CPFl 750,343 1,563,425 11. Transferred to: Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certi t oregoing is we and correct to the best of my knowledge. Signatur Title: Supervisor Date: 3/18/01 Field(s) KUP ARUK RIVER UNIT MonthlY ear of Disposirlon 2/02 *Indicate contriburlon of each pool to total. Pool Name Code Percent .-,I.,.'7{¿' KUP ARUK RIVER UNIT 490100 ~ ).13 KUP ARUK RIVER UNIT MELTWATER 490140 ~ KUP ARUK RIVER UNIT T ABASCO 490160 0.18% 2.0."} KUP ARUK RIVER UNIT TARN 490165 ~% o Official Use OnlynFlaring Authorization> 1 hr. 1. Safety J~q I MCF 2. Lease Use MCF 3. Conserv. Purposes MCF V:M^'^1 M.tJ,,). lid ~-;f ':)....YI 0 >- Commissioner Date ifkik J/UIOL o o o Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. PHILLIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 February DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8< CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 2/27/2002 18:08-19:24 278 High Ambient temps. UNPLANNED Reduced Inlet gas rates. 2/10/2002 05:79-ü6:28 1,413 Faulty shutdown on C-Gas Lift Comp. Excessive Inlet Gas UNPLANNED Reduced Inlet gas rates. Corrected E&I fluctuation TOTAL OVER 1 HOUR 1,691 PLANNED EVENTS LESS THAN 1 HOUR o Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge 1.691 13,212 o 14.194 TOTALFLAREDIVENTED 29,097 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator PHILLIPS ALASKA, INC. Disposition Volume MCF* 1. Sold 31.868 2. Reinjected 5,220,689 3. Flared or vented less than 1 hour 7,911 4. Flared or vented greater than 1 hour Su iemental re ort re uired--See 20 AAC 25.235 o 5. Pilot and Purge 17,508 6. Used for lease operations Fuel 768,749 7. Other o TOTAL items 1 -7 6,046,725 8. NGL gas equivalent Dfoduced o 9. Purchased gas o 10. Transferred from: PBU CGP (LSEOR NGLS) CPFl 921.330 1,320,840 11. Transferred to: o Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Na tha used in SSEOR meter #201 I hereby certify t e fore g is true and correct to the best of my knowledge. Title: Supervisor Date: 4/18/01 Signature: Field(s) KUPARUK RIVER UNIT MonthlYear of Disposition 3/02 *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 79.66% KUPARUK RIVER UNIT MEL TW A TER 490140 2.78% KUPARUK RIVER UNIT TABASCO 490160 0.18% KUPARUKRIVER UNIT TARN 490165 17.38% Official Use Only--Flaring Authorization> 1 hr. 1. Safetv MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psi a and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PHILLIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTiNG INCIDENTS CPF #2 March PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTALFLAREDNENTED o o o 7,911 o 17.508 25,419 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator PHILLIPS ALASKA, INC. Field(s) KUP ARUK RIVER UNIT MonthlY ear of Disposition 4/02 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 33,760 Pool Name Code Percent 2. Reinjected 4,862,503 KUPARUKRIVER UNIT 490100 73.23% 3. Flared or vented less than 1 hour 13,714 / KUP ARUK RIVER UNIT MELTWATER 490140 5.72% 4. Flared or vented greater than 1 hour 1,118 V KUPARUKRIVER UNITTABASCO 490160 0.25% rSunnlemental renort rt'.iluired--See 20 AAC 25.235) 5. Pilot and Purge 18,381 KUPARUK RIVER UNIT TARN 490165 20.80% 6. Used for lease operations Fuel 717,999 A~~i~t 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items I - 7 5.647.475 ./ 1. Safety /1/8 MCF 8. NOL gas eauivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU COF (LSEOR NGLS) 785,159 ( fl... 10. P. AJ' 'k ^'.-./ to/to }öy CPFl 1,167,644 COmmiSSio!J~ 0 Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby JP ;t,oing;, """ ;md """'" to !be be" of oiY know"dg', month following the month of disposition. Signature: .. ~ n J Title: Supervisor Date: 5/17/02 Authority 20 AAC 25.235. ..J&jZ.- Fonn 10-422 (Revised 4/95) DATE TiME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE PHILLIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARiNG OR VENTING INCIDENTS CPF #2 April VOLUME MCF DESCRIPTION OF INCIDENTS 8< CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 3/31/1998 04:46-06:03 4/8/1998 10:50-11 :59 21 :58-23:06 4/11/1998 14:11-15:11 $ dC>~ ?-. TOTAL OVER 1 HOUR 431 220 210 257 1,118 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTALFLAREDNENTED o 33,213 Facility Maintenance; High ambient temperatures. High ambient temperatures High ambient temperatures High ambient temperatures 1,118 13,714 o 18,381 Unplanned Stabilized facilty process and operations Unplanned Reduced inlet gas rates Unplanned Reduced inlet gas rates Unplanned Reduced inlet gas rates ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator PHILLIPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT 5/02 Disposition Volume MCF* 1. Sold 32,720 2. Reinjected 3,883,680 3. Flared or vented less than 1 hour 7,288 4. Flared or vented greater than 1 hour 12,027 ./ (Sunnlemental renor! rpl1uired--See 20 AAC 25.235) 5. Pilot and Purge 18,337 6. Used for lease operations Fuel 712,772 A~~i~t 0 7. Other 0 TOTAL items 1 - 7 4,666,824 ./ 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 721.955 CPFl 1,567,797 11. Transferred to: 0 Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby ceJk ~~ing, is true and correct to the best of my knowledge. Signature: ~ ,~ /, J Title: Supervisor Date: 6/18/02 Form 10-422 Revised 4/95 MonthlY ear of Disposition *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 65.00% KUPARUK RIVER UNIT MELTWATER 490140 8.95% KUPARUK RIVER UNIT TABASCO 490160 0.31% KUPARUK RIVER UNIT TARN 490165 25.74% Official Use Only--Flaring Authorization> 1 hr. l. Safety \",2. J 0 z.... 7 MCF ::r &e-- MCF 2. Lease Use 3. Conserv. Purposes MCF ~ I 0,).- Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. PHILLIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 May DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS 8< CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 5/13/1998 12:50-14:39 2,629 34.5 lines open. Plant load shed. Unplanned Reduced inlet gas and restarted A&C GLC. 5/15/1998 14:10-15:10 219 'A' GLC surge Controller. High ambienttemps. Unplanned Reduced inlet gas and restarted MC GLC. 5/1711998 13:52-15:44 2,713 GLC's A& B shut down on high pressure Unplanned Restarted A& B and repaired difficulties with A. 5/25/1998 16:47-17:55 687 Emergency shutdown due to bad transmitter on flash drum Unplanned Reduced inlet gas and restarted MC GLC. LT-1020 5/25/1998 20:50-22:52 955 While shut down because of faulty L T -1020, Plant BESD was Unplanned No action taken during BESD testing of plant. done. 5/25/1998 23:05-03: 13 4224 Start up of gas lift compressors and unidentified leakage of Unplanned Start up of gas lift compressors and unidentified valves. leadage of valves causing flare. 5/26/1998 12:36-13:46 600 Excessive inlet g~s to facility and High ambient temps. Unplanned Shut in 5 production wells to reduce incoming gas rate. TOTAL OVER 1 HOUR 12,027 PLANNED EVENTS LESS THAN 1 HOUR o Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge 12,027 7,288 o 18,337 TOTALFLAREDNENTED 37,652 -- --~- GAS FLARING or VENTING REPORT ~1J;\O~ PHILLIPS ALASKA, INC. . KUPARUI<IALPINE -- FACILITY: CPF2 PERMIT NO. - GAS DISPOSITION Dat.. <If Occurrence: 5/26/2002 o Flare Dvent Time of Occurrence: (mmJdd/yy) (Check Selection) 00:00 ~ Minutes From: ~ To: ~ '" 01:08 Ú.tal Volume Flared or Vented: ~ MSCF BBlS From: To: - '" - - From: - To: - = ! I From: To: - = - Meter No. ( By Facility) Total Minutes Flared or Vented = 01:08 (Includes volume flared which generated black smoke, If applicable) A. O,,~ç¡iþûl>n ~t Incident and Cause: (Check as manr as needed to fully describe the incident) -- SID T/CR - for - Process upset in T/C SD due to high exhausltemperature saction of facilitr Seal oii system ditficuUie.s Flering for driUsite shutdOwn / startup X EMERGENCY SHUTDOWN Rare system testing Electrical/Instrumentation malfunction FauJly shutdown en Electrical I Instrumentation maltunclion Facility maintenance at other facility (T&D) High ambient temperatures. Gas tlansit system overpressure SID on high vibration backing CPFIRow Station out X Other: ESD plant due to bad transmitter Excessive I iosutficient Inlet gas on flash drum l T·1 020 rates into facility a. AcUcm Taken to Eiirnit\8te Cause and Prevent Recunenee: (Check and describe as applicable) Started / restarted TIC iI Stabilized facility process and operation Compressor I train depressured Repaired equipment ditticulties X Reduced I increased Inle1 gas rates wíth Completed flare testing FaciJity maintenance completed Corrected E&I fluctuation I failure Other: -- Corrected E&J fluctuation / failure at other facility (T&D) C. Flaring or Venting was: (Check one) 0 necessary for facility operations, repairs, upgrades, or testing procedures 0 an emergency that threatened life or property ,"~,,~. 0 necessarv to Drellent loss of ultimate reeoverv -"._. "' Ventlnq Incident W..s th.. voluml¡ over 1 ,000 msef? Ves: 0 No: 0 (If Yes,complete form and contact FEC immediately). - .,,-' . ~"~""'."~'""-'~ Flare Incident TRUE ,.... Did incidant last for longer than 1 hour? Yes 0 No 0 II Yes, tax this report to FEC within 24 hours 659-7712. 0 0 Did incident cause black smoke (3 minutes in 1 hr)? Yes: No: Ii Vel!. I¡,x this n,pc>l1Ia ADEC immediately 907/269-7508 and notify FEC. Bjack smoke emilled 1rom source: (enler tag number and description) O,Üó aflu time of black smoke event: From: To: Volume flared which generated black smoke: MSCF - B8lS DescJÌplíon of steps to minimize emissions: (Section B above) Maì¡,tial tlared: Gas: NGls: Other: General Weather. Air Temperature: Wind Speed/Direction: N¡,me and phone number of person making the report: Name Phone No, -- ,.-- Based on ¡( formation and belief formed after reasonable inquiry, I certify that the statements and information In and attached to this document are true. accurate and complete. Facility Supervisor i!Z4:111'/0rðL {fð>¡. fl12:'W'~ale 5/2712002 cc: Alpine: Field Environmenfal Compliance Coordinators, ALP-14 (FlareNent & Black Smoke Incidents) Kuparuk: Field Environmental Compliance Coordinators, NSK 61 (FlareNent & Black Smoke Incidents) Upd<;¡loc.i: FEC 1/02 P:\Grôups\HSE1\Envitonmental Help\Fam'lS\ Z-d ZIU,-SSS (¿OS) 1~+U~WUO~1^U3 ~n~~dn~ dSl:~O ~O ¿~ ¡::;~W ~-- ~-~ -- .-.-.- GAS FLARING or VENTING REPORT PHILLIPS ALASKA, INC. . KUPARUKJALPINE FACiliTY: CPF2 PERMIT NO. GAS DISPOSITION (mm/dd/yy) o Flare 0 Vent (Check Selection) lime QQ;QQ ~ of Occurrence; 24:00 To: ~ To: To: To: Minutes 02:02 Oat.. 01 Occurr",nce: 5126/2002 Tota' Volume Flared 0' Vented: ~MSCF BBlS From: From: From: From: Meter No. ( By Facility) Total Minutes Flared or Vented '" 02:02 (includes volume flared which generated black smoke, It applicpble) A Description of Incident and Cause: (Check as many as needed to lully describe the Incident) SID T/C# for TIC SD due to high exhaust temperature Seal oil system difficuhies EMERGENCY SHUTDOWN Electrical I Instrumentation malfunction Electrical ¡Instrumentation maJIunclion al other lacility (T&D) Gas transit system O\Ierpressure backing CPFIFlow Station out Exc&ssiva I ¡nsofficienl inial gas rates Into lacUity x Process upsettn section of facil~y Flaring for drillsh. shutdOwn I startup Flare system lesting Faully shutdown on Facility maintenance High ambient temperatures. SID on high vibration Olher: while the plant was down due to ESP d I L T-1020 we did a la.IiíiI!e ich resulted in this --volume of flare ~çsþ 6. Act;ûn Takòl1 to Eliminate Cause and P,avent Recurrence: (Check and ducrlbe as applicable) Started J restarted TIC /I Compressor / train depressurod Reduced I increased inlet gas rates Completed flare testing Corrected E&I fluctuation I failure Correded E& I fluctuation I failure at other facility (T&D) x th -- -- C. flaring or V..nting was: (Check one) o necessary for facility operations. repairs, upgrades, or testing procedures o necesser to revent ioss of ultimate recove o an emergency thallhreatened life or property Ventina Incident Was the vCJ'ume ouer 1,000 msc'? Yes; o No: o (1/ Ves,compJete form and contact FEC immediately). Flare Incident TRUE Did inddent last for longer than 1 hour? Ves 0 No 0 If Ye$, ta)! this 'epart to FEC within 24 hours 659-7112. Díd indo"llt cause black smoke (3 minutes in 1 hr)? Yes: 0 No~ 0 II Yes, í",¡¡ this report to ADEC immediately 9071269-7506 and notify FEC. Black smoke emitlad from source: (enter tag number and descnpUon) Datê and lime at black smoke event: From: To: VLilume flared which generated black smoke: MSCF B8lS P~$cription of steps to minimize emissions: (Section B above) MateliáJ flared: Gas: NGLs: Other: ¡;¡"n"ral Weather: Air Temperature: Wind Speed/Direction: Name and phone number of person making the report: Name Phone No. BáS6j on Information and belief formed after reasonable inquiry, I certify that the sta1ements and information in and attached to this dOCUI1\611t are true. accu~ ~nd complete. ~ "'¡cIlIlV Supervisor liZ:!::!!ljlU)~¡:2'fJt ß~ J~ Date 5/27/2002 cc: Alpine: Field Environmental Compliance Coordina ors. Alp·14 (FlarelVent & 81ack Smoke Incidents) KuparuK: Field Environmen1aJ Compliance Coordinators, NSK 61 (FlarelVent & Black Smoke Incidents) Updatt;:d: F.ËC 1í02 P;\GroupsIHSET\Environmenral HeipIForme\ c-d ~1l..¿-6SS (l..06) le+uawuo~~^U3 ~n~edn~ d9t:~0 ~O l..~ ~ew GAS FLARING or VENTING REPORT PHilLIPS ALASKA, INC. . KUPARUKlAlPINE FACILITY: CPF2 PERMIT NO. -~- GAS DISPOSITION Ollte of Occunence: 5126/2002 o Flare o Vent Time of Occurrence: (mrn/ddlyy) (Check Selection) 00:00 ~ Minutes From: ~ To: ~ '" 04:08 Total Vulume Flared or Venled: ~ MSCF - eelS From: - To: - ~ From: - To: - '" L::ter No. / From; - To; - '" ( By Facility) Total Minutes Flared or Venled ;;; 04:08 (Includes volume flared wmch generated black smoke. if applicable) A. Dð"",lpüon 01 Incident and Cause: (Check as many as needed to fully describe the ¡ncldenl) SID T/C# - for - Process upset In TIC SD due to high exhaust temperature section of facility Seal oil system rufficuhies Flaring for draIsite shutdownJ startup EMERGENCY SHUTDOWN Flam system testing Eleclrical J Instrumentation maHunction Faully shutdown on EleclricaJ Ilnslrumentatjon malfunction Facilily maintenance at ather facility (T&OJ High ambient temperatures. Gas transit system overpressure SID on high lIibration backing CPF/Aow station out X Other: Start up of Gas un compressors Excessille I insuHicle rAlnlel gas and unidentified leakage of rales into facilily lIallles 8. Action nk..n to eliminate Cause and Prevent Recurrence: (Check and describe.s applicable) Started I restarted TIC It Stabilized facility process and operation Compressor J train depressured Repaired equipment dilficu/ties Reduced I increased Inlet gas rates with Completed flare testing Facility maintenance completed Corrected E&I fluctuation 1 failure X Other: start-up 01 gas compressors Corrected E&I fluctuation I failure and Identified val lies that were at olher facility (T&D) leaking to flare C. Flaring or Venting was: (Check one) 0 necessary for facility operations. repairs, upgrades. or testing procedures 0 an emergency that threatened life or property 0 necessarY 10 oreventloss of ultimate recoverY .u...... .~".,_. Ventin!llncident Was the 1/olume oller 1,000 macl? Yes: 0 No: 0 (II Yes,complele form and contact FEC immediately). _. _."...__n_-'"" .. Flare Incident TRUE .. _.".~..- - .. _...~..~.-_."....._..., Did incident last lor longer than 1 hour'? Yes 0 No 0 If Y"s, till( this report to FEC within 24 hours 659-7712. 0 2) Did incident caUSE: black smoke (3 minutes In 1 hr)? Yes: No: It V¡'í>, f..¡¡ this repc 1 to ADEC Immediately 9071269·7508 and notify FEC. Bleck smoke emitted from source: (enter tag number and desc,iption) 0",11; and time of black smoke ellent: From: To: Volume flared which generated black smoke: MSCF - BBLS De.cliptioll of steps 10 minimize emissions: (Section B abo1/e) Material flared: Gas; NGls: Other: G..nE:r<¡1 Weather: Air Temperature: Wind Speed/Direction: Namt! and phone number of person making the report: Name Phone No. -. .._....'~ -~ - Based on information and belief formed after raasonable inquiry. I certify thallhe statements and information in and attached to this document are true. accurate and complete. . F&cUity Supervisor J{JÚ/J1J/~ (&z. fJ"L.-v~ b~ JDBte 5127/2002 cc: Alpine: Field Environmental Compliance Coordinators. AlP-14 (FiareNent & Black Smoke Incidents) Kuparuk: Field Enllironmental Compliance Coordinators, NSK 61 (FlareNent & Black Smoke Incidents) up".'."; FEC 1/02 P:\Groups\HSET\Environmenlal Hatp\Form::¡¡\ v·d ~IL¿-SSS (¿OS) 1~~uaWUO~1^U3 ~n~~dn~ d91:~O ~O L~ h~ ., CPF2 MAY 26TH AND 27TH FLARING EVENTS SUMMARY . The first flare event at CPF2 started at 16:47 on 5/25/2002 and lasted 1 hr. 8 min. This was the result of an operator initiated facility-wide emergency shutdown (ESD) due to a defective level transmitter on the crude flash drum. All production from CPF2 was shut down at that time and all CPF2 drill site wells were shut in. .. The second flare event started at 20:50 and lasted 2 hr. 2 min. This was the result of a facility-wide blowdown emergency shutdown (BESD) and restart of the gas compressors. Note: One hour of the flare event can be attributed to the Facility BESD Test. This test has to be performed every 3 years (it has been 2 years since our last test), and we decided to do it while the facility was shutdown because we anticipated that the instrumentation repairs necessary to bring the facifity back on line would take longer than the duration ot the test. .. The third flare event started at 23:05 and lasted 4 hr. 8 min. This was the result of the continued start up of the gas compressors and valves venting to the flare system. These flaring events were a result of an emergency shutdown and subsequent restart of CPF2 and could not have been avoided. 5"'" 21U.-6SS Cl.06 ) le~uaWUOJ~^U3 ~nJedn~ dSl:20 20 ¿2 ~e ..J Hea Ith, Environment, Safety, Training. and Emergency Services P. O. Box 196105, NSK·45 Anchorage, AK 99510-0360 Phone: (907) 659-7593 Fax: (907) 659-7861 Fax To: Fax: 5-1 eu t.. (Iì ¿ me, ¡'''' S' From: Phillips Alaska, Inc;. J~- /1 >;¡ /'.-'/~Z )_ 2 -}.. dOL 5' Phone: Date: Pages: Re: cc: o Urgent ø For Review o Please Comment 0 Please Reply o Please Recycle -Comments: ¡ . d cnU,-6SS \, £l,D6 ) t~~UaWUO~~^U3 ~n~~dn~ ds¡:aD aD ¿a ¡::;~w ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator PHILLIPS ALASKA, INC. Disposition Volume MCF* I. Sold 34.431 2. Reinjected 4,392,993 3. Flared or vented less than 1 hour 7,083 5. Pilot and Purge 17,322 6. Used for lease operations Fuel 722,372 7. Other TOTAL items I - 7 5,174,201 8. NGL gas eauivalent produced 9. Purchased gas 10. Transferred from: PBU CGF (LSEOR NGLS) CPFl 713,267 1,026,122 11. Transferred to: Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Na tha used in SSEOR meter #201 I hereby certify t for ing is true and correct to the best of my knowledge. !/ Title: Supervisor 7/19/2002 ."-,, Field(s) KUPARUKRIVER UNIT MonthlY ear of Disposition *Indicate contribution of each pool to total. Pool Name KUP ARUK RIVER UNIT KUPARUK RIVER UNIT MELTWATER o KUPARUKRIVER UNIT TABASCO KUPARUKRIVER UNIT TARN o Official Use Only--Flaring Authorization> 1 hr. 1. Safetv o 2. Lease Use o 3. Conserv. Purposes 6/02 Code Percent 490100 87.78% 490140 3.15% 490160 0.12% 490165 8.95% MCF MCF MCF Commissioner Date o Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. PHILLiPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 June DATE TIME VOLUME MCF DESCRIPTiON OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR TOTAL OVER 1 HOUR PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTALFLAREDNENTED 7,083 o 17,322 24,405 ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator PHIlLIPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT 7/02 Disposition Volume MCF* 1. Sold 33,039 2. Reinjected 4,596,995 3. Flared or vented less than 1 hour 14,020 4. Flared or vented greater than 1 hour 11,847 rSunnIemental renor! reauired--See 20 AAC 25.235) 5. Pilot and Purge 18,327 6. Used for lease operations Fuel 729,080 A,~i~t 0 7. Other 0 TOTAL items 1 - 7 5,403,308 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 720,401 CPFl 873,864 11. Transferred to: 0 Remarks: Reinjected vol does not include volumes ofPBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby certify ~at th~Z.0i~g is true and correct to the best of my knowledge. Signature: J: j(; J À · ... J Title: Supervisor 8120/2002 Form 10-422 (RevIsed 4/95) MonthlY ear of Disposition *Indicate contribution of each pool to total. Pool Name Code Percent KUP ARUK RIVER UNIT 490100 73.91 % KUPARUK RIVER UNIT MELTWATER 490140 7.29% KUPARUKRIVER UNITTABASCO 490160 0.33% KUPARUK RIVER UNIT TARN 490165 18.47% Official Use Only--Flaring Authorization> 1 hr. 1. Safety 1(,347 MCF 2. Lease Use MCF 3. Conserv. Purposes MCF ~Á ~ q )( ,,)0.3- Commissione Date 3<3¡c- Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. PHILLIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 7/16/2002 08:40 - 09:47 187 C2-1 01 A shutdown due to ambiant related seal oil problems Unplanned Reduced inlet gas and stabilized facility process & operation 7/16/2002 19:00·21:19 3,207 1 st stage bal piston switch failure causing C2-102 to trip Unpianned Reduced inlet gas and correctedE&1 fluctuation/failure 7/2312002 18:26 - 20:23 3,752 Load Shed due to Frame 6 shutdown Unpianned Reduced inlet gas, corrected E&I fluctuation and restarted 7/25/2002 20:48 - 22:05 635 Electrical Instrument malfunction/Excessive Inlet gas Unpianned Reduced Inlet gas rates 7/2512002 12:33 . 18:05 3514 Emergency shutdown due to Electrical malfunction Unplanned Total shutdown of aSD Plant 7/29/2002 17:09 - 18:15 552 Shutdown due to Instrumentation malfunction Unpianned Replaced manual block PIC - 1108 TOTAL OVER 1 HOUR 11,847 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge 11,847 TOTALFLAREDNENTED 44,194 ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT 9F PRODUCED GAS DISPOSITION MonthlY ear of Disposition Facility CENTRAL PROCESSING FACILITY #2 Operator PffiLLIPS ALASKA, INC. Field(s) KUPARUKRIVER UNIT 8/02 Disposition Volume MCF* 1. Sold 35,926 2. Reinjected 4,957,643 .. 3. Flared or vented less than 1 hour 10,109 4. Flared or vented greater than 1 hour 978 ¡./ {Sunnlemental renort reouired--See 20 AAC 25.235\ 5. Pilot and Purge 18,862 6. Used for lease operations Fuel 742,927 A~~i~t n 7. Other 0 TOTAL items 1 - 7 5,766.445 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: PBU CGF (LSEOR NGLS) 686,385 CPF1 697,662 11. Transferred to: 0 Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR reflected on line 10 or Naptha used in SSEOR meter #201 I hereby :~ the foregoing is true and correct to the best of my knowledge. \ U.l..ß. /~~ ~I$ Signature: ...... . , Title: Supervisor.. 9/2012002 FOnTI 10-422 (Revised 4/95) Y *Indicate contribution of each pool to total. Pool Name Code Percent KUPARUK RIVER UNIT 490100 73.39% KUPARUK RIVER UNIT MELTWATER 490140 7.25% KUPARUK RIVER UNIT TABASCO 490160 0.33% KUPARUK RIVER UNIT TARN 490165 19.03% Official Use On1y--Flaring Authorization> 1 hr. 1. Safety 9 7ß MCF :JtS1L 2. Lease Use MCF 3. Conserv. Purposes MCF ,/ hI ) ~ Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. DATE TIME PHII¡;LIPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING EVENTS GREATER THAN 1 HOUR VOLUME MCF DESCRIPTION OF INqlDENTS & CAUSE 8/21/1998 1641-1806 8/24/1998 1155-1337 TOTAL OVER 1 HOUR 373 Shutdown due to electricaVinstrumental malfunction Startup of new C2-101D GLC and had mechanical and instrument problems with flare valves 605 978 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTAL FLAREDNENTED o 29,949 PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Reduced inlet gas, stabilized facility process and Unplanned operation and started up NGL ESP's. Repaired equipment difficulties with C2-1 01 D and Unplanned performed maintenance on the vent to flare valves. ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility joperator Ifield(S) I MonthlY ear of Disposition CENTRAL PROCESSING FACILITY #2 PHILLIPS ALASKA, INC. KUPARUKRIVER UNIT 9/02 Disposition ¡ Volume MCF* *Indicate contribution of each pool to total. , 1. Sold 32,209 Pool Name Code Percent 2. Reinjected 5,028,291 KUPARUK RIVER UNIT 490100 87.13% 3. Flared or vented less than 1 hour 13,220 KUPARUK RIVER UNIT MELTWATER 490140 2.97% 4. Flared or vented greater than 1 hour 12,392 KUPARUKRIVER UNITTABASCO 490160 0.11% (SuDD1emental reDort reauired--See 20 AAC 25.235) 5. Pilot and Purge 20,695 KUPARUKRIVER UNIT TARN 490165 9.79% 6. Used for lease operations Fuel 684,077 A ~~i~t 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items 1 - 7 5,790,884 1. Safety '\ 2£ 31 ¿~, MCF 8. NGL gas eouivalent produced 0 2. Lease Use MCF ¡ 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU CGF (LSEOR NGLS) , 711.323 (W"~~J,J: ~ /ðf¡ ð- D>- CPFl 768,665 COmnusSlO Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes ofPBU NGLS ~quired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereb:J«king is true and correct to the best of II¡ly knowledge. month following the month of disposition. S· -'. : /.n:. ·tl S· f1z 02 Authority 20 AAC 25.235. Ignatur' ., , TI e: upervIsor 0/20 ~- Fonn 10-422 (RevIsed 4/95) PHilLIPS ALASKA, INC. CONSE~VATION ORDER NO. 219 GAS DATE TIME VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 'f/:f¡ 11998 1612-1729 313 Leaking 2nd stage vent to flare was discovered Unplanned Shut in GLC C2-1 01 D and repaired bad equipment Electrical problems to ¢2-101O. C2-101A & C2-101B also 9~1998 2305-0008 4,807 tripped from surge events. Unplanned Reduced gas rates and restarted C2-101A & C2-101B ~ 9r998 1118-1235 336 Shut in due to high am~iant tempuretures Unplanned Reduced inlet gas. Shut in 8 production weils. 9 {1998 1255-1411 1,023 Shut in due to Gas lift 9ompressor Unplanned Shut in 13 production weils to reduce inlet gas. I Reduced inlet gas. Shut in 68 pl'lScfd of gas. Restart 9/2i}'1998 0908-1128 5,913 In plant load shed due ro electrical power supply trouble Unplanned Gas handling equipment. MA. TOTAL OVER 1 HOUR 12,392 PLANNED EVENTS LESS THAN 1 HOUR o Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Piiot and Purge 12,392 TOTALFLAREDNENTED 46,307 - c:> I c.> c:> I "" c:> c:> "" c:> "" en '" 3 PHILUPS ALASKA, JNC. CONSERVATjON ORDER NO. 219 GAS FlARING OR VEHTlNG INCIDENTS CPF #2 ·-sePte~;; ; ...... ~ CI 3 I ..... ::J: ..- ..- ..... en :>- ^ ;æ: n ACTjON TAKEN TO EUMINATE CAUSE PLANNED UNPLANNED DATE TIME VOLU1J E MCF DESCRIPTION OF INCIDENTS & CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUf¡ repaired Dad eq~ment Reducec:l gas fates and re-slañed C:?-1 01 A & C2-1 01 B Reduced Inlet gas. Shu1 in 8 prooumiOn \vells. Sltut in 13 production wells 10 reduĊ“ Inlet gas. Reclucecl inlet gas. Shulln 68 nnscfd of !las. fie Ga.s handling equipment start Shut in GLC C2-101 D and Unplal'lned Unplanned Unplanned Unplanned Unplann&d leaking 2nd stage van! to lIare was discovered C2-101A & C2·101B also In piant road shed due ¡o eledirical power supply trouble Elec!rical problems 10 C2-101D. tripped from surge evenls. Shulln due to hiah anbianllempurelures ShlJl In due to Gas Iif CompresS[}1 313 4,807 335 1,023 5,913 1ß12-1729 2.'305-0008 1118-1235 1255-1411 0908-1128 91100:>2 9I29.i2002 9,12/2002 9,1-412002 !t1'9l2OO2 12,392 TOTAL OVER 1 HOUR CD c:> ..... "" en <:n en <:n ..... .þ. 12,392 1$~¡!-'~ :. ~ 0' 20..6!J~ HOUR o PLANNED EVENTS LESS THAN Flare or Vent Volumes; Grea1el Ulan 1 hour less th6111 hour CoIIlinuous Assisl Pilot ane! Purge TOTAL fLAfiEDNENTEÐ -t I CD en CD ..... c:> c:> "" ........ c:> c:> "" ...... I CD c.> CD j ?: 'ilL rC RE""( , -- -~,. --.. 46,307 AliS~~~¡dcG4lb("0It.':, .O"¡¡W~!i1 A!1';:~1'OOf; ,,¡ ~ ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLIPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT MonthlY ear of Disposition 10/02 Disposition Volume MCF* *Indicate contribution of each pool to total. 1. Sold 35,571 Pool Name Code Percent 2. Reinjected 5,667,727 KUPARUK RIVER UNIT 490100 88.38% 3. Flared or vented less than 1 hour 2,027 KUP ARUK RIVER UNIT MEL TW A TER 490140 2.99% 4. Flared or vented greater than 1 hour 2,322 V KUPARUK RIVER UNIT TABASCO 490160 0.14% (SuoolementaI renor! reouirednSee 20 AAC 25.235) 5. Pilot and Purge 22,480 KUPARUK RIVER UNIT TARN 490165 8.49% 6. U sed for lease operations Fuel 697,556 A ~~i~t 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items 1 -7 6.427.683 1. Safetv 2 3ZZMCF ( 8. NOL gas eauivalent oroduced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU COF (LSEOR NOLS) 779336 (n"I' ,('), ^ ¡ .1' ~, 1", lõt".>lù)..- CPFl 425,403 commissiQer IJ Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes of PBU NOLS aquired for LSEOR pressure of 14.65 psi a and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. Signature: ~ ~ Authority 20 AAC 25.235. Title: Supervisor 11120/2002 JP~ Form 10-422 (Revised 4/95) , DATE TIME PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE CONOCOPHILLiPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 October 2002 VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 10/7/2002 0016-0213 TOTAL OVER 1 HOUR 2,322 2,322 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTALFLAREDNENTED o 2,322 2,027 o 22.480 26,829 "D" GLC shutdown vibration problem \. Unplanned Reduced gas rates -{ ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLlPS ALASKA, INC. Field(s) KUP ARUK RIVER UNIT MonthlY ear of Disposition 11102 Disposition Volume MCF* *Indicate contribution of each pool to total. I. Sold 31.552 Pool Name Code Percent 2. Reinjected 4,442,923 KUPARUK RIVER UNIT 490100 89.35% 3. Flared or vented less than I hour II, 799 KUPARUK RIVER UNIT MELTWATER 490140 3.65% 4. Flared or vented greater than I hour 5,822 C/ KUPARUKRIVER UNITTABASCO 490160 0.07% ISunolementaI renort reouired--See 20 AAC 25.235) 5. Pilot and Purge 22,813 KUPARUK RIVER UNIT TARN 490165 6.93% 6. Used for lease operations Fuel 667,758 A..iot 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items 1 - 7 5.182,667 I. Safetv ~ <ð 2;7- MCF 8. NGL gas equivalent Dfoduced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU CGF (LSEOR NGLS) 697,112 Ú~ \C1-JvJ.- ~t I ?'(.J.- -ria _ CPFl 1,047,057 CommissOner Date 11. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes of PBU NGLS aquired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. Signature: 77 ttlf.~ IVth/2002 Authority 20 AAC 25.235. Title: Supervisor <íBf- Form 10-422 (Revised 4/95) DATE TIME CONOCOPHiLLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 November 2002 VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE FLARiNG OR VENTING EVENTS GREATER THAN 1 HOUR 11/5/1998 1143-1252 11/5/1998 1517-1645 11/6/1998 0014-0121 111711998 1011-1154 11/11/1998 1951-2056 11/23/1998 0517-0704 TOTAL OVER 1 HOUR 1,406 890 283 2,799 242 202 5,822 V PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Voiumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTALFLAREDNENTED o ~~~) 22.813 ~I "W \!JV.A~'þ~ -h'-~~'-I-o I 1'1.. \ vu (ìl.I.~ IO-z--- }t \ b ç :.--) Q) &;\I~y,g..~L ~) Flaring for drillsite shutdown/startup; faulty shutdown on 11/3/02- TAPS sId; facility restart following earthquake- motivated shutdown Flaring for drillsite shutdown/startup; faulty shutdown on 11/3/02-TAPS sId; tacility restart following earthquake- motivated shutdown Excessive!ìnsufficient inlet gas rates into facility; restarting Prudhoe Bay NGL Plant shutdown Excessive!ìnsufficient inlet gas rates into facility; process upset in gas process section of facility; B GLC went down due to first stage pressure Excessive!ìnsufficient inlet gas rates into facility Excessive!ìnsufficient inlet gas rates into facility; high ambient temperatures; PV-11 08 valve leakage 40,434 PLANNED UNPLANNED Unplanned Unplanned Unplanned Unplanned Unplanned Unplanned ACTION TAKEN TO ELIMINATE CAUSE Reduced!ìncreased inlet gas rates; stabilized tacility process and operation Reduced/increased inlet gas rates; stabilized facility process and operation Stabilized tacility process and operation; completed satety purging of equipment Reduced!ìncreased inlet gas rates; stabilized facility process and operation; B Gas Lift comp started on second attempt Stabilized facility process and operation Reduced!ìncreased inlet gas rates; stabilized tacility process and operation; leolated PV-1108 and will repair I'·. I s\.vJ\-t.11 Vv"'-£ reYlkkc.l . ()F- 'T-¡:Jk;.. Jßf!-. . I Z{ n ( J z.- " ALASKA OIL AND GAS CONSERV A TION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Facility CENTRAL PROCESSING FACILITY #2 Operator CONOCOPHILLIPS ALASKA, INC. Field(s) KUPARUK RIVER UNIT MonthlY ear of Disposition 12/02 Disposition Volume MCF* *Indicate contribution of each pool to total. I. Sold 34,327 Pool Name Code Percent 2. Reinjected 5,115,957 KUPARUK RIVER UNIT 490100 88.81% 3. Flared or vented less than 1 hour 28,717 KUPARUK RIVER UNIT MELTWATER 490140 3.61% 4. Flared or vented greater than 1 hour 8,544 /' KUPARUK RIVER UNIT TABASCO 490160 0.06% (Suoolemental renort reouired-·See 20 AAC 25.235\ 5. Pilot and Purge 23,819 KUPARUK RIVER UNIT TARN 490165 7.52% 6. Used for lease operations Fuel 757,047 A«ist 0 7. Other 0 Official Use Only--Flaring Authorization> 1 hr. TOTAL items 1 - 7 5.968.411 1. Safetv S544- MCF ) 8. NOL !!:as eauivalent produced 0 2. Lease Use MCF 9. Purchased gas 0 3. Conserv. Purposes MCF 10. Transferred from: PBU COF (LSEOR NOLS) 879.329 (å11AJnA..A In) /'.1' ~. . '^' õ/lO/ð:3 CPFI 1,529,000 Commissibher 0 Date II. Transferred to: 0 Note: All volumes must be corrected to Remarks: Reinjected vol does not include volumes of PBU NOLS aquired for LSEOR pressure of 14.65 psia and to a temperature of reflected on line 10 or Naptha used in SSEOR meter #201 60 degrees F. Report due by the 20th of the I hereby certify that the foregoing is true and correct to the best of my knowledge. month following the month of disposition. Signature:~ Authority 20 AAC 25.235. Title: Supervisor 1/20/2003 3~ß- Fonn 10-422 (Revised 4/95) DATE TIME CONOCOPHILLlPS ALASKA, INC. CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 December VOLUME MCF DESCRIPTION OF INCIDENTS & CAUSE FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 12/22/1998 1711-1821 12/22/1998 1836-2243 12/24/1998 0232-0345 12/24/1998 0716-0842 12/26/1998 0354-0801 12/28/1998 0503-0605 TOTAL OVER 1 HOUR 3,766 2,802 223 1,504 187 62 8,544 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour Less than 1 hour Continuous Assist Pilot and Purge TOTALFLAREDNENTED o 8,544 28,717 o 23.819 61,080 Electrical/instr. malfunction; excessive/insufficient inlet gas rates into facility; process upset in gas and oil suction of facility; due to CPF-1 generator shutdown Electrical/instrum. Malfunction at other facility; Excessive/ insuff. Inlet gas rates into facility; process upset in gas & oil section; start-up problems with gas compressors Process upset in LSEOR section of facility SID T/Cs C2 101 B for high pressure; excessive/insufficient inlet gase rate into facility; process upset in gas section of facility SID T/C C2-1 01 B for fuel gas problems; process upset in gas Excessive inlet gas rates into facility; process upset in gas; C2-1 01 B s/o on high pressure \. J PLANNED UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Unplanned Reduced/increased inlet gas rates; stabilized facility process and operation; repaired equipment diff. w/ compressors; shut-in inlet manifold Unplanned Reduced/increased inlet gas rates; stabilized facility process & operation; repaired compressors; located source of flare & decreased gas load Unplanned Reduced/increased inlet gase rates; stabilized facility process and operation Unplanned Started/restarted T/C C2-101B; S/110 mmscf gas on 2V pad Unplanned Reduced/increased inlet gas rates; shut in 80 mmscf gas Unplanned Started/restarted C2-1 01 B; stabilized facility process and operation