Volume MCF'
1. Sold 0
2. Reinjected 3,371 ,029
3. Flared or vented less than 1 hour 18,244 /
f'" ...._.....,."""
4. Flared or vented ¡¡reater than 1 hour ( 126.346
(Supplemental report required--See 20 AAC 25.235) \
5. Pilot and Pur¡¡e '---2';759
6. Used for lease operations Assist 0
Fuel (at island) 217,514
Fuel (Caribou Crossin¡¡) 16,240
Fuel IPS#1 htr' 13 801
7. Other 0
TOTAL items 1-7 3,765,933
8. NGL ¡¡as equivalent produced 0
9. Purchased ¡¡as 1,393,982
10. Transferred from:
11. Transferred to:
and correct to the best of my knowledge.
Title f'VlG (L "'\ A:x Date '2-{ (q ( c--z....
Form 10-422
Rev. 4/95
MonthNear of Disposition
Jan-02
'Indicate contribution of each pool to total.
Pool Name IJoae Percent
1. Safety MCF
2. Lease MCF
3. Conserv. Purposes MCF
!:~~~~;,U~-~ð~ Da~ 5 10 Y
Of¿ Wc¡1r t ì5 0 L
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Gas Flaring Incident Report
BP Northstar
Jan-2002
Volume flared less than 1 hour:
Volume flared greater than 1 hour:
18244
126346
Run Date:
Total Flared Volume: 144,590
Jan-31-2002
08-Feb-02
Start DatelTime
End DatelTime
MCF
Volume
.::::::d¡~¡~¡~~~~~~~~~¡~¡~¡~¡~¡~¡~¡~¡~¡~¡~¡~¡~¡~¡::~~~¡~¡~~~~~~~¡~¡~¡~~~~~~~~~~~~:~:::n~¡:¡~¡~¡~¡~~~~~¡~~:~:~~¡:::¡:::¡:::¡:::¡:::¡:::¡t::¡¡::¡:::¡¡¡¡¡:~¡~:~¡~¡~¡~¡~:~:~:~:~:¡~:~I
Event T e
:¡::~::~:uij::~~::lijlª:¡~ills:~:ill~~~li~~I:~¡~:i::II:~¡¡~~ì~¡~.~~~¡~¡~~~:~~~~~~~¡~~~~~~~~:~:¡::::::~:~:~:~:~:~:~:~:~:~:~:~:::¡:::
Total: 18209
...............,. . .... ............... ....'..............,. ......................,.,..........'.......................................'........,..........................................,........................................................................................................................................................ ....... .................................................. .......................................................
./
HPA compressor failed to restart after
1/4/022:02 AM 1/4/02 3:44 AM 4780 lant BESD due to a fault fuel valve. Re air fuel valve
HPA compressor failed to restart after
1/4/022:08 AM 1/4/02 3:39 AM 314 lant BESD due to a faul fuel valve. Re air fuel valve
HP A compressor failed to restart after
1/4/022:12 AM 1/4/02 3:37 AM 129 lant BESD due to a faul fuel valve. Re air fuel valve
. \
HPA compressor faded to restart after ~
1/4/02 4:01 AM 1/4/025:53 AM 5195 lant BESD due to a faul fuel valve. Re air fuel valve.
1/4/02 5:35 AM 1/4/02 8:09 AM 294 Re air fuel valve
1/4/02 5:53 AM 1/5/02 9:01 AM 23753 Re air fuel valve
HPA compressor failed to restart after
1/4/029:15 AM 1/4/02 2:48 PM 550 lant BESD due to a fault fuel valve. Re air fuel valve
HPA compressor failed to restart due
1/4/027:19 PM 1/4/029:18 PM 160 to low ambient tern s.
HPA compressor failed to restart due
1/4/02 9:20 PM 1/5/027:48 AM 822 to low ambient tem s.
HPA compressor failed to restart due
1/5/029:11 AM 1/5/02 10:23 AM 3129 to low ambient tem s.
Page 1 of 5
Gas Flaring Incident Report
BP Northstar
Run Date: 08-Feb-02 Jan-31-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type
HPA compressor failed to restart due
1/5/029:14 AM 1/5/02 10:24 AM 212 to low ambient temps. Equipment Outage
HPA compressor failed to restart due
1/5/02 10:27 AM 1/5/0212:47 PM 310 to low ambient temps.. Equipment Outaqe
1/5/02 11 :53 AM 1/6/02 5:36 PM 13513 HPA Compressor failed. Restart Compressor. Equipment Outaqe
HPA compressor failed to restart due
1/5/0212:49 PM 1/5/026:15 PM 571 to low ambient temps. Equipment Outaqe
HPA compressor failed to restart due
1/5/026:21 PM 1/5/028:44 PM 198 to low ambient temps. Equipment Outage
HPA compressor failed to restart due
1/5/029:00 PM 1/5/02 11 :00 PM 150 to low ambient temps. Equipment Outaqe
LP compressor down following HPA
outage due to minor maintenance
1/5/02 11 :00 PM 1/6/025:11 PM 3799 concerns Complete maintenance activity Equipment Outaqe
LP compressor down following HPA
outage due to minor maintenance
1/6/02 5:37 PM 1/6/02 7:39 PM 515 concerns Complete maintenance activity Equipment Outage
LP compressor down following HPA
outage due to minor maintenance
1/6/025:39 PM 1/6/028:01 PM 422 concerns Complete maintenance activity Equipment Outage
HPA shutdownrrSHH-2336 activated
1/8/02 9:07 AM 1/8/02 3:58 PM 2604 prematurely TSHH-2336 recalibrated Equipment Outaqe
LP compressor shut down due to loss
1/8/02 9 :08 AM 1/8/02 10:36 AM 341 of HPA Restart HPA Equipment Outaqe
LP compressor shut down due to loss
1/8/02 11 :20 AM 1/8/021 :12 PM 446 of HPA TSHH-2336 recalibrated Equipment Outaqe
LP compressor shut down due to HPA
1/8/02 1 :44 PM 1/8/02 2:58 PM 260 shut down TSHH-2336 recalibrated Equipment Outaqe
LP compressor failed to start due to a
1/8/024:16 PM 1/8/027:12 PM 706 3rd staqe PSV liftinq Reseated frozen PSV Equipment Outage
Could not restart HPA due to NS-31
hydraulic control panel not working Utilized portable power pack to
1/11/026:16 PM 1/11/029:56 PM 3453 properlY. pump up well hydraulics. Equipment Outaqe
Could not restart HPA due to NS-31
hydraulic control panel not working Utilized portable power pack to
1/11/026:26 PM 1/11/029:18 PM 503 properlY. pump up well hydraulics. Equipment Outaqe
./
Page 2 of 5
Gas Flaring Incident Report
BP Northstar
Run Date: 08-Feb-02 Jan-31-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type
1/12/02 5:27 AM 1/12/02 10:43 AM 2972 LP Compressor SID. Restart Compressor. Equipment Outaqe
1/12/02 5:50 AM 1/12/02 10:32 AM 475 LP Compressor SID. Restart Compressor. Equipment Outaqe
1/12/02 2:30 PM 1/12/02 3:46 PM 137 Plant SID (LP Sep LAHH)' Restart Plant. Upset
LP separator shut down/HH level in LP
1/12/022:31 PM 1/12/02 3:34 PM 149 separator Reduced level in LP separator Upset
1/13/02 8:28 AM 1/13/022:47 PM 1147 LP Compressor SID. Restart Compressor. Upset
1/13/02 8:56 AM 1/13/02 3:05 PM 997 NGL Flare. Restart Plant. Upset
1/13/02 3:38 PM 1/13/02 5:43 PM 214 LP Compressor SID. Restart Compressor. Upset
1/13/024:32 PM 1/13/025:53 PM 155 NGL Flare\ Plant SID. Restart Plant. Upset
1/16/022:41 AM 1/16/026:31 AM 56 4th stage HP scrubber problems Equipment Outage
1/16/02 11 :32 AM 1/16/025:59 PM 111 4th staqe HP scrubber problems Equipment Outaqe
1/16/026:16 PM 1/16/02 10:25 PM 68 4th staqe HP scrubber problems Equipment Outaqe
1/17/0212:46AM 1/18/0212:14 AM 3200 4th staqe HP scrubber problems Equipment Outage
1/17/027:29 AM 1/17/022:35 PM 1567 LP compressor shut down Equipment Outage
started wells online for pipe line
1/17/024:36 PM 1/18/02 12:54 AM 1313 temperature maintenance Equipment Outaqe
1/18/02 1 :52 AM 1/19/02 4:22 AM 845 restarting LP compressor Equipment Outage
1/19/0211:14AM 1/19/02 12:25 PM 20 Plant OSD Upset
1/19/02 3:44 PM 1/19/0210:24 PM 1495 Restartinq plant Equipment Outaqe
1/19/023:52 PM 1/20/02 10:32 AM 1734 Restart plant Equipment Outaqe
PCV-1031 off IP separator is leaking to Work order to repair when parts
1/20/02 10:45 AM 1/21/02 3:15 AM 97 flare arrive. Equipment Outage
PCV-1031 off IP separator is leaking to Work order to repair when parts
1/21/025:12 PM 1/22/024:46 AM 33 flare arrive. Equipment Outage
1/22/02 1 0:46 AM 1/22/0212:17 PM 8 LP Compo & HPA Compo SID Equipment Outage
1/22/0212:53 PM 1/22/02 3:42 PM 807 LP Compo & HPA Compo SID Equipment Outaqe
1/22/02 12:54 PM 1/22/028:57 PM 4607 LP Compo & HPA Compo SID Equipment Outage
1/22/02 4:09 PM 1/22/025:11 PM 1705 LP Compo & HPA Compo SID Equipment Outage
1/22/024:11 PM 1/23/024:07 AM 2700 LP Compo & HPA Compo SID Equipment Outaqe
1/22/029:21 PM 1/23/023:18 AM 1338 LP Compo & HPA Compo SID Equipment Outage
1/23/02 4:36 AM 1/23/02 1 :53 PM 647 LP Compo & HPA Compo SID Equipment Outage
1/23/02 8:35 AM 1/23/02 11 :39 AM 2156 LP Compo & HPA Compo SID Equipment Outaqe
1/23/02 1 :56 PM 1/24/02 10:41 AM 1238 LP Compo & HPA Compo SID Equipment Outaqe
Cold weather causing transmitter
1/25/02 4:05 AM 1/25/02 5:38 AM 60 failure. FI-4260 Equipment Outage
,,;
Page 3 of 5
Gas Flaring Incident Report
BP Northstar
Run Date: 08-Feb-02 Jan-31-2002
MCF
Start DatelTime End DatelTime Volume IncidenUCause Description Remediation Taken Event Type
Cold weather causing transmitter
1/25/02 5:43 AM 1/25/02 6:53 AM 51 failure. FI-4260 Equipment Outaqe
Cold weather causing transmitter
1/25/0210:19 AM 1/25/0212:35 PM 84 failure. FI-4260 Equipment Outage
Cold weather causing transmitter
1/25/0212:34 PM 1/25/022:45 PM 74 failure. FI-4241 Equipment Outaqe
Cold weather causing transmitter
1/25/02 12:37 PM 1/25/023:18 PM 104 failure. FI-4260 Equipment Outaqe
IP separator instrumentation failure
resulting in production & LP com p
1/25/02 3:23 PM 1/25/026:41 PM 477 OSD Upset / Equipment Outé
IP separator instrumentation failure
resulting in production & LP comp
1/25/02 3:48 PM 1/25/026:51 PM 297 OSD Upset / Equipment Outé
Cold weather causing transmitter
1/25/02 6:53 PM 1/26/027:31 AM 815 failure. FI-4260 Equipment Outaqe
Cold weather causing transmitter
1/26/0212:18 AM 1/26/027:45 PM 132 failure. FI-4241 Equipment Outage
Cold weather causing transmitter
1/26/02 8:58 PM 1/26/0210:04 PM 1 failure. FI-4241 Equipment Outaqe
Cold weather causing transmitter
1/27/0211 :28 AM 1/27/023:23 PM 1019 failure. FI-4260 Equipment Outage
Cold weather causing transmitter
1/27/02 1 :07 PM 1/27/029:34 PM 705 failure. FI-4241 Equipment Outaqe
Solar-NOX testing caused SID of
WHRU system which resulted in NGL
1/28/02 11 :55 AM 1/28/02 11 :21 PM 13272 system upset & total production OSD. Upset
Solar-NOX testing caused SID of
WHRU system which resulted in NGL
1/28/0212:25 PM 1/28/0210:31 PM 1215 system upset & total production OSD. Upset
Cold weather causing transmitter
1/29/023:55 PM 1/29/02 10:41 PM 4922 failure. FI-4260 Equipment Outaqe
Work on HP Flare Scrubber turbine
1/30/02 7:30 AM 1/30/028:35 AM 1085 meter. Pull and repair meter. Equipment Outage
,,/
Page 4 of 5
Gas Flaring Incident Report
BP Northstar
Run Date:
08-Feb-02
Start DatelTime
1/31/0210:28 AM
MCF
Volume
2390
Incident/Cause Descri tion
Leakin hose on HPA Driver.
End DatelTime
1/31/0212:04 PM
Total: 125821
~~~:~:~:~I¡I.~:::III~~~jl~::.~::I:~:f:::ti:::::::::~t::~i:¡¡~:~.~~:lli:~~IÎ:~IIII¡I:ti~:III:::II:~:~:~:~:~:~:~:~:¡::~:~~~~::~::¡~:::~¡~~¡¡~~~~~~:~:~:~:~:~~~:~:¡:¡
Jan-31-2002
Remediation Taken
Re air hose.
E
/
~:~:~:~:~:~:rr~:~:~:~:~:~:~:~:~:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:j:~:j:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:~:;:i
ttttt¡1tttt¡jttttttttttttt¡1tt;
Total: 36
Tuning LP compressor suction
1/1/2002 6:53 1/1/2002 6:54 0 ressures.. .
1/12/2002 12:27 1/12/200212:34 1 Bleedin ressure from HPB
LP compressor Commissioning
1/20/2002 8:34 1/20/2002 8:41 9
Solar "A" gas starter> started
1/28/2002 1 :56 1/28/20022:03 5 Followin "C" shutdown
Started A Solar (twice) for WHR
1/29/20028:19 1/29/2002 8:41 11 testin Solar A start
Started A Solar (twice) for WHR
1/29/2002 8:58 1/29/20029:16 10 testin Solar A start
.....:.:.:.:.:.:.:.:.:.:.:...:.:.:.:.;.:.:.:.;.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.;.:.:.:.:.:.:.:.:.:.:.:.:,:,:,:,:,:,:,:,:,:,:",:,:,:,:,:,:,:",:,:,:,:",:.:.;....':.,.:.;...;.,.;.:.;.:.:.:...,.:.:.:.:.:.:...:.:...:.:':',':',':':',':',':':':':':',':':':':':':':':':':':':.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:. :.:.:.:.:.:.;.:.:.:.:.:.:.:.:.:.:.:.:.:
:¡:¡:HþjijM~d~:~im¡mi~:i.¡i:::::::~~~::::1it~:~h.¡ij~~~I~:¡111::::::::~:::::~~:II~:~Mi.~~:~:~:~:~:~:¡:~:~:~:~¡~:~:~:¡:~:¡:~:¡:~:¡:~:~:~:¡:¡:¡:¡:::::::¡:~:~:~:~:~:~:~:~:~:~:~:~:~:~:¡:¡:¡:::::::::::~¡::¡::::¡:¡:¡:¡:¡:¡:¡:¡:¡
1/20/20024:34
Total:
1/20/026:15 AM
LP com ressor commissionin
525
525
Page 5 of 5
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Field(s)
Northstar
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 2,669,863
3. Flared or vented less than 1 hour 1,121
4. Flared or vented ¡¡reater than 1 hour 176,524 ./
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,492
6. Used for lease operations Assist 0
Fuel (at iSland) 204,444
Fuel (Caribou Crossin¡¡) 17,247
Fuel (PS#1 htr' 11 423
7. Other 0
TOTAL items 1-7 3,083,114 ./
8. NGL ¡¡as equivalent produced 0
9. Purchased ¡¡as 1,274,660
10. Transferred from:
11. Transferred to:
I hereby certi that the foregoing is true and correct to the best of my knowledge.
Signature Title /\It bO ~x: Date ~
Form 1 0-422
Rev. 4/95
MonthNear of Disposition
Feb-02
'Indicate contribution of each pool to total.
Pool Name I\.,;oae
Percent
1 . Safety
t¡.J(;/t
7/ nlO1-
MCF
j755l f
'l qq4>
2. Lease
MCF
3. Conserv. Purposes
MCF
<..3)ð :1 )~ r
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
NORTHST AR FLARING REPORT - Februarv 2002
A majority of the flaring in February became necessary when a catastrophic failure of the A HP
compressor occurred on February 7. The problem was an impeller failure, which was caused by
a manufacturing defect. When this failure occurred, the B HP compression train had not yet been
commissioned. This process took several days and it was February 20 before full time operations
could be established. During the period that HP compression was not available, steps were
taken to minimize flaring by reducing the plant throughput rate to the minimum level needed to
prevent pipeline flow assurance problems.
Addendum to ADGGG Gas Flaring Incident Report
3/19/2002
Volume flared less than 1 hour:
Volume flared greater than 1 hour:
Run Date:
04-Mar-02
Start DatefTime
End DatefTime
.........:-:.:::::;:.:-:.:-:.:::;:;:;.;......:::.:::::::::::::::::.:.:.:.:::::.:::::::::::::::::.:::::;:.:::.:::.:::..;:;:;:;:;:::;:;:...;.:.:........... .....................,......,.....,',.,'..,...".
:Q.~::îij¡M~:¡f.ii~6.i¡]¡j$~:fg'¡i¡ºr::ø:ijN:tß.~:~j:~:~6.iji~:::~:::~:::~:::~¡:¡~¡::~¡:¡~::
...................""'.'''......,.......... ........ ............."..
:~:~:::¡:06:::~~¡ijla.:~ê.i~I~¡::(:~~i~i~~~I¡¡~~:j:~::6.j~~:¡:¡:¡:¡
2/1/029:12 AM 2/2/021:22 PM
2/1/0210:03 AM 2/1/025:07 PM
2/1/02 5:32 PM 2/1/028:09 PM
2/2/022:51 AM 2/3/02 11 :48 AM
2/3/02 5: 14 AM 2/3102 8:25 AM
2/3/02 10:54 AM 2/3/02 12: 14 PM
2/4/02 3:05 PM 2/6/02 7:29 AM
2/6/02 7: 15 PM 2/6102 10: 18 PM
2/7/028:26 AM 2/7/02 9:33 AM
2/7/02 10:49 PM 2/8/02 2:39 AM
2/8/02 2:39 AM 2/8/02 6:50 AM
2/8/02 3:21 AM 2/12/02 12:53 AM
2/8/02 7:51 AM 2/8/02 9: 19 AM
2/8/02 9:23 AM 2/8/02 4:58 PM
2/8/02 4:59 PM 2/8/02 6:49 PM
2/8/02 7:02 PM 2/10102 9:57 AM
2/10102 11: 1 0 AM 2/16/02 12:55 AM
Gas Flaring Incident Report
BP Northstar
Feb-2002
1121
176524
MCF
Volume
Total: 837
8174 Bringing on wells after sId. Slow bleed down of wells. Equipment Outage N1.FLARE.EVENT.HP1
1188 Compressor sId from HPA hose failure. Restart Compressor. Upset N1.FLARE.EVENT.LP
862 Compressor sId from HPA hose failure. Restart Compressor. Upset N1.FLARE.EVENT.LP
695 Failed transmitter recalibrated Equipment Outage N1.FLARE.EVENT.LP
7467 Failed transmitter Replace RTD Equipment Outage N1.FLARE.EVENT.HP1
2 Failed transmitter Recalibrated Equipment Outage N1.FLARE.EVENT.HP1
992 Unknown Unknown Upset N1.FLARE.EVENT.LP
693 LP Coompressor SID. Restart Compressor. Equipment Outage N1.FLARE.EVENT.LP
347 Unknown Unknown Upset N1.FLARE.EVENT.LP
216 H PB starter gas Plant Integrity N1.FLARE.EVENT.HP1
Reduce chokes to minimum
431 HPA Compressor SID rates. Equipment Outage N1.FLARE.EVENT.LP
54309 HPA SID. Reduce Chokes. Equipment Outage N1.FLARE.EVENT.HP1
Reduce chokes to minimum
100 HPA SID. rates. Equipment Outage N1.FLARE.EVENT.LP
Reduce chokes to minimum
586 HPA SID. rates. Equipment Outage N1.FLARE.EVENT.LP
Reduce chokes to minimum
123 HPA SID. rates. Equipment Outage N1.FLARE.EVENT.LP
Reduce chokes to minimum
2764 HPA SID. rates. Equipment Outage N1.FLARE.EVENT.LP
Reduce chokes to minimum
9443 HPA SID. rates. Equipment Outage N1.FLARE.EVENT.LP
Page 1 of 3
Gas Flaring Incident Report
BP Northstar
Run Date: 04-Mar-02
MCF
Start DatefTime End DatefTime Volume Incident/Cause Description
2/12/02 2: 16 AM 2/15/02 4:33 AM 40170 HP A failed
2/15/02 4:40 AM 2/16102 12:54 AM 6333 HP Compression Train is SID
2/16/02 12:56 AM 2/1710210:43 AM 14168 HP Compression Train had upsets.
HP Compression Train had upsets.
2/16/02 12:56 AM 2/17/022:14 AM 2652 LP Compression Train is shut down.
2/171022:16 AM 2/1710210:36 AM 1448 HP B shutdown
2/17/0211:12 AM 2/171021:15 PM 3664 HPB Compressor SID for mapping.
2/1710211:17 AM 2/171021:18 PM 333 HPB Compressor SID for mapping.
2/17/02 1 :35 PM 2/18/02 7: 15 AM 4782 LP shut down
2/17/02 1 :58 PM 2/17/02 11 :07 PM 1642 HPB Compressor SID.
2/17102 11 :36 PM 2/18/02 6:41 AM 1299 Plant BESD.
2/18/02 6: 13 PM 2/19/0210:46 AM 858 This is a non-event, Fi failure.
2/18/02 11: 15 PM 2/19102 2:05 AM 1222 Plant BESD.
2/23/02 3: 1 0 PM 2/23/025:17 PM 2826 Shut down HP-B for repair.
Phantom flare. Possible sources
include TEG reboiler vent scrubber off
gas, produced water surge tank and
2/24/02 1 :23 AM 2/26/02 6:56 AM 1768 looking elsewhere
2/24102 9:43 AM 2/24/02 1 :48 PM 450 OSD due to HPB SID upset
2/26102 2:56 PM 2/26/02 4: 19 PM 12 LP 1 st suction control
2/26102 5:58 PM 2/28/029:33 PM 1207 Leak by flare valves
2/28/02 3:56 AM 2/28/02 4:58 AM 300 HPB PSV problems
Total: 173528
... .... ............"",...",........................... .........................................."....."."...."",................."..,,,,,,,,,,...............................
. ......... ..... ..,....................................................... ...........................................................,...,.......................",..................................
.,.........,.............................,...,..................................... .......................................................................,...,...,....'.',...,'..,'.','.','.','.','.'....,................................................'.','.','.','..,',',',',',',',',',','......................................
~::::::¡:~~~~I~~:~lffii~:Ji~i::tlij::.if~:lijw.·:jija~:::â.§ø.~::í¡'¡:¡NI¡¡I.*~~¡mijø::Iºø::Mþf]:~::~:¡::::¡¡:~¡¡¡¡¡¡¡¡:¡¡:¡¡¡::::::¡¡::~~::::~¡:::¡::::::¡:{:)i
Total:
284
1
Purge HPB
2/7/2002 17:52
2/7/2002 18:21
Feb-28-2002
Remediation Taken
repair/commission HP B
Commissioning HPB
Commissioning HPB.
Commissioning HPB.
Will re-start LP Compressor
when commissioning is
complete on HPB.
Flare event ended 0710
Restart Compressor
Restart Compressor.
Restarted compression train.
Restart Compressor.
Restart Plant.
Restart Plant.
Cut back production to
minimize flaring.
Trouble shooting.
Re-start wells and LP
compressor
Made adjustments on 1 st stage
control
Stop Purge.
Event Type
Equipment Outage
Equipment Outage
Equipment Outage
" ,
Event Name
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
Equipment Outage N1.FLARE.EVENT.LP
Equipment Outage I Opa N1.FLARE.EVENT.LP
Equipment Outage N1.FLARE.EVENT.HP1
Equipment Outage N1.FLARE.EVENT.LP
Equipment Outage
Equipment Outage
Upset
Equipment Outage
Upset
Equipment Outage
Plant Integrity
Upset
Upset
Plant Integrity
Plant Integrity
Equipment Outage
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
Page 2 of 3
Gas Flaring Incident Report
BP Northstar
Run Date: 04-Mar-02 Feb-28-2002
MCF
Start DatefTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
2/7/2002 19:23 2/7/2002 19:53 1 Purge HPB. Stop Purge. Equipment Outage N1.FLARE.EVENT.HP1
2/7/2002 20:53 2/7/2002 21 :25 187 Purge HPB. Stop Purge. Equipment Outage N1.FLARE.EVENT.HP1
2/7/200221 :24 2/7/2002 21 :30 7 Attempt start on HPB. SID HPB. Equipment Outage N1.FLARE.EVENT.LP
2/7/200221 :26 2/7/200221 :49 47 Purge HPB. Stop Purge. Equipment Outage N1.FLARE.EVENT.HP1
2/7/2002 21 :51 2/7/200221 :59 5 Purge HPB. Stop Purge. Equipment Outage N1.FLARE.EVENT.HP1
2/7/2002 21 :54 2/7/200221 :57 2 Attempt start on HPB. SID HPB. Equipment Outage N1.FLARE.EVENT.LP
2/7/2002 22:04 2/7/200222:10 0 Purge HPB. Stop Purge. Equipment Outage N1.FLARE.EVENT.HP1
2/7/2002 22:07 2/7/200222:10 3 Attempt start on HPB. SID HPB. Equipment Outage N1.FLARE.EVENT.LP
2/21/20026:45 2/21/2002 6:52 9 Starting gas for A Solar. Normal. A Solar Start N1.FLARE.EVENT.LP
2/22/20028:21 2/22/2002 8:28 9 Starting Gas for A Solar. Normal. A Solar Start. N1.FLARE.EVENT.LP
2/22/2002 10:24 2/22/2002 10:31 8 Starting Gas for A Solar. Normal. A Solar Start. N1.FLARE.EVENT.LP
2/22/2002 11: 36 2/22/2002 12:23 7 Starting Gas for A Solar. Normal. A Solar Start. N1.FLARE.EVENT.LP
~::~~:¡¡:i~iIÎ::I¡ijli.:il~;'Î~ij~:::~¡~:~iÎ.ij~:Äf¡:ìÎ_¡li:~111'::I~~::~:::¡¡::~i~:~i:~:i::'i:~ij'i~i'iii~jii'iii:i:j~:i.~.ii~.i~~~j~i~i:~~i~i~i¡j¡j~:ij~ji:iji:i:i:~:¡:¡~i~·:·:¡:¡::::~~::¡:~¡~:~~~~~~~~¡~j¡~¡:~~¡~~j~¡¡~:
Total: 2996
2/3/2002 12:50 2/4/02 1 :44 PM 343 Start on HPB Plant Integrity N1.FLARE.EVENT.LP
2/3/2002 16:52 2/5/025:46 PM 340 HPB blow down and purge Plant Integrity N1.FLARE.EVENT.HP1
2/5/2002 22:07 2/6/02 1 :09 AM 6 Purge HPB Compressor. Stop purging. Equipment Outage N1.FLARE.EVENT.HP1
2/6/2002 19: 19 2/71023:12 PM 864 Purging machine. Stop Purge. Equipment Outage N1.FLARE.EVENT.HP1
2/19/2002 13:30 2/20102 2:46 AM 355 Starting gas for A Solar turbine Normal A Solar start N1.FLARE.EVENT.LP
2/21/200216:22 2/22/02 12:59 AM 241 Starting gas for A Solar. Normal. A Solar Start N1.FLARE.EVENT.LP
2/22/2002 2:58 2/22/02 5:56 AM 50 Starting gas for A Solar. Normal. A Solar Start. N 1. FLARE. EVENT. LP
2/22/2002 14:21 2/22/02 10:38 PM 165 Starting Gas for A Solar. Normal. A Solar Start. N1.FLARE.EVENT.LP
2/23/2002 0:03 2/24/02 12:30 AM 633 Starting Gas for A Solar. Normal. A Solar Start. N1.FLARE.EVENT.LP
Page 3 of 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Operator
BP Exploration Alaska) Inc.
Field(s)
Northstar
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 5,096,879
3. Flared or vented less than 1 hour 17,285
4. Flared or vented ¡¡reater than 1 hour 81,283 /
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,759
6. Used for lease operations Assist 0
Fuel (at island) 258,078
Fuel (Caribou Crossin¡¡) 31,261
Fuel IPS#1 htri 13 077
7. Other 0
TOTAL items 1-7 5,500,622 /
8. NGL ¡¡as equivalent produced 0
9. Purchased ¡¡as 2,495,164
10. Transferred from:
11. Transferred to:
I hereby certify that thcegOing is true and correct to the best of my knowledge.
Signature QO. A./yy,h Title /lll.btL \ì"<')< Date ~
Form 1 0-422
Rev. 4/95
Month/Year of Disposition
Mar-02
'Indicate contribution of each pool to total.
Pool Name L;ode
Percent
1. Safety
E I Z f~ MCF µt;4--
2. Lease
MCF
3. Conserv. Purposes
MCF
~hA~~'~ ~
commis~ner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Gas Flaring Incident Report
BP Northstar
Mar-2002
Volume flared less than 1 hour: 17285
Volume flared greater than 1 hour: 81283
Run Date:
04-Apr-02
Total Flared Volume: 98,568
Mar-31-2002
Total: 17285
MCF
Volume
Start DatelTime
End DatelTime
:~:::::~~~~~~~~~~~~II~:¡li~~~ì¡:~II:~~~~~:~:~~:¡::i:~:i::::II~:~~~~~~~~~:~I~~~:~:~:~:~:~:~~~:~~~:~:~:~~~:~:
..........................
.....,...................
.................. .. ..........................
......................... ....... ...........
........................ .....................
..... ........ ....................... ...................
?f]Jh":]¡nM~fÊiijmit:l¡¡j¡Mij¡rid{6.Iit:{{
Thermanol caused ngl upset causing Opened up coolers on HPA
3/1/02 1 :59 PM 3/2/02 1 :49 AM 275 crude stabilizer to flare and fired up TEG burners. Upset N1.FLARE.EVENT.LP
3/2/02 7: 18 AM 3/2/02 8: 18 AM 9 PCV leaking Reseated Equipment Outage N1.FLARE.EVENT.LP
LP comp 3rd stage level transmitter
3/3/02 11 :23 PM 3/4/02 10:32 PM 6220 failure. Equipment Outage N1.FLARE.EVENT.LP
LP camp 3rd stage level transmitter
3/3/02 11 :23 PM 3/4/024:51 PM 4387 failure. Equipment Outage N1.FLARE.EVENT.HP1
Reduced rates while repairing
3/4/02 6:06 PM 3/4/02 11 :02 PM 741 Lp compressor down LP compressor. Equipment Outage N1.FLARE.EVENT.HP1
3/4/02 11 :07 PM 3/5/02 5:58 PM 1360 Plant start up. Upset N1.FLARE.EVENT.LP
HPB-FI-2360 failed because it FROZE
3/5/02 3:25 AM 3/5/02 6: 11 PM 8846 at tape root. Equipment Outage N1.FLARE.EVENT.HP1
HPB-FI-2360 failed because it FROZE
3/5/02 8: 11 PM 3/9/02 9:46 AM 4555 at tape root. Equipment Outage N1.FLARE.EVENT.LP
3/5/02 9:24 PM 3/6/02 2:36 AM 839 Plant start up after Pump 1 plug off. Upset N1.FLARE.EVENT.HP1
HPB flow meter failed causing it to Repaired flow meter and wizard
3/7/027:12 AM 3/7/02 6:59 PM 7075 ESD valve Equipment Outage N1.FLARE.EVENT.HP1
Disabled detector until it can be
3/8/02 1:10PM 3/8/02 10:33 PM 6540 Failed gas detector in HP-B enclosure repaired Equipment Outage N1.FLARE.EVENT.HP1
Blocked in PSV and opened up
3/9/02 11:10 AM 3/1010212:19 AM 822 PSV leaking by . PSE. Plant Integrity N1.FLARE.EVENT.LP
Shut plant down to pull a valve at the
3/9/02 6:05 PM 3/9/02 9:05 PM 548 pig receiver repaired and started back up. Equipment Outage N1.FLARE.EVENT.HP1
Blocked in PSV and opened up
3/10102 1: 14 AM 3/10102 5:02 AM 72 PSV leaking by . PSE. Plant Integrity N1.FLARE.EVENT.LP
Page 1 of 4
Gas Flaring Incident Report
BP Northstar
Run Date: 04-Apr-02 Mar-31-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
Blocked in PSV and opened up
3/10102 1: 13 PM 3/11/02 6:20 PM 671 PSV leaking by . PSE. Plant Integrity N1.FLARE.EVENT.LP
Blocked in PSV and opened up
3/11/02 11 :03 PM 3/12/02 12:22 AM 15 Psv leaking by. PSE Plant Integrity N1.FLARE.EVENT.LP
Blocked in PSV and opened up
3/12/02 12:30 AM 3/12/02 3:31 AM 477 PSV leaking by. PSE. Plant Integrity N1.FLARE.EVENT.LP
Trouble shot and started B
3/12/0212:31 AM 3/12/024:10 AM 2729 C Solar shut down. Solar. Equipment Outage N1.FLARE.EVENT.HP1
Blocked in PSV and opened up
3/12/02 11 :53 AM 3/12/02 4: 13 PM 98 PSV leaking by. PSE. Plant Integrity N1.FLARE.EVENT.LP
3/13/02 11 :02 AM 3/19/02 8: 18 AM 6591 Unknown None Unknown N1.FLARE.EVENT.LP
3/13/02 11 :31 PM 3/14/02 2:53 AM 3144 HPB Compressor. S/I wells, restart compressor. Upset N1.FLARE.EVENT.HP1
3/16/02 10:20 AM 3/16/02 11 :58 AM 199 OSD-Loose wire in NGL J box. Restart Plant. Equipment Outage N1.FLARE.EVENT.HP1
3/16/023:17 PM 3/16/02 4:28 PM 115 OSD- Therminol Leak in Pump house. Restart Plant. Equipment Outage N1.FLARE.EVENT.HP1
LP Compressor S/D- LAHH in 1 st stg.
3/18/02 4: 17 AM 3/18/02 11 :54 AM 1242 Scrubber. Restart Compressor. Equipment Outage N1.FLARE.EVENT.HP1
Shut-in wells and restart
3/18/02 6:44 PM 3/18/02 9:20 PM 424 LP Compressor shutdown. compressor. Equipment Outage N1.FLARE.EVENT.HP1
Shut -in wells and restart
3/19/02 9:53 AM 3/19/02 11 :13 AM 8 LP Compressor shutdown. Compressor. Equipment Outage N1.FLARE.EVENT.LP
Unknown, Suspect Meter, will write
3/19/02 11 :27 AM 3/21/02 3:03 AM 1073 work order to check. None. Opacity N1.FLARE.EVENT.LP
3/21/02 3:48 AM 3/21/025:48 AM 18 Unknown. None. Opacity N1.FLARE.EVENT.LP
Raise flare set point back to
3/21/02 11 :36 AM 3/25/02 11 :27 AM 5975 Unloading NS-08 to test Separator. normal value. Opacity N1.FLARE.EVENT.LP
Plant OSD, LAHH in HP Flare
3/23/02 3:40 AM 3/23/02 6: 10 AM 673 Scrubber. Restart Plant. Upset N1.FLARE.EVENT.HP1
Plant OSD, LAHH in 1 st. stg Suction
3/23/02 2:01 PM 3/23/02 4: 13 PM 288 Scrubber. Restart plant. Upset N1.FLARE.EVENT.HP1
3/24/02 2:44 PM 3/24/02 6:30 PM 1348 Plant OSD- Istg. Suction Scrubber. Restart Plant. Upset N1.FLARE.EVENT.HP1
3/24/02 9: 10 PM 3/25/02 1 :04 AM 745 OSD, 1 st. stg. suction scrubber. Restart Plant. Upset N1.FLARE.EVENT.HP1
LP compressor down due to LAHH in
3/25/02 1: 11 AM 3/25/02 9:38 AM 3890 the first stage suction scrubber Cut NS-09, 13 & 27. Equipment Outage N1.FLARE.EVENT.HP1
3/25/02 11:45 AM 3/25/02 9: 14 PM 713 Bringing on wells. Complete well bleedown. Upset N1.FLARE.EVENT.LP
Page 2 of 4
·
Gas Flaring Incident Report
BP Northstar
Run Date: 04-Apr-02 Mar-31-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
SII NS-09, 13 & 14. NS-08 &
27 on at minimum chokes.
LP compressor down due to LAHH in Replacing level transmitters on
3/25/02 12:34 PM 3/25/02 3:02 PM 140 the 1 st stage suction scrubber the 1 st stage suction scrubber. Equipment Outage N1.FLARE.EVENT.HP1
LP Compressor Shutdown 1 st. stg.
3/25/02 3:22 PM 3/25/02 6:03 PM 264 Suction scrubber LAHH. Restart Plant. Upset I Equipment Outa~ N1.FLARE.EVENT.HP1
Production shutdown and LP
3/27102 11: 11 AM 3/27102 12:26 PM 21 compressor shutdown restart compressor. Upset N1.FLARE.EVENT.HP1
Production shutdown and LP
3/27102 11:13AM 3/27102 3:30 PM 289 compressor shutdown restart compressor. Upset N1.FLARE.EVENT.LP
Production shutdown and LP
3/27102 12:34 PM 3/27102 3:28 PM 535 compressor shutdown. restart compressor. Upset N1.FLARE.EVENT.HP1
3/29/02 11 :00 AM 3/29/02 1:40 PM 417 LP compressor shut down. Repair and restart. Equipment Outage N1.FLARE.EVENT.LP
3/29/02 11 :18 AM 3/29/02 2:01 PM 410 LP compressor shutdown. Repair and restart. Equipment Outage N1.FLARE.EVENT.HP1
3/29/02 4:42 PM 3/29/02 10:57 PM 992 LP compressor outage. repair and restart. Equipment Outage N1.FLARE.EVENT.LP
3/29/02 4:52 PM 3/29/02 11: 18 PM 974 LP compressor shutdown. repair and restart. Equipment Outage N1.FLARE.EVENT.HP1
Fire alarm and smoke report .BESD
3/29/02 11 :20 PM 3/30102 12:26 AM 73 plant. Emergency N1.FLARE.EVENT.HP1
3/30102 7:27 AM 3/30102 9:24 AM 29 compressor shutdown. repair underway. Equipment Outage N1.FLARE.EVENT.HP1
3/30102 5:23 PM 3/30102 6:44 PM 25 compressor shutdown. repair underway. Equipment Outage N1.FLARE.EVENT.LP
3/30102 6:54 PM 3/31/02 7:16 AM 507 compressor shutdown. repair underway. Equipment Outage N1.FLARE.EVENT.LP
3/30102 8:40 PM 3/30102 10:59 PM 1703 compressor shutdown. Equipment Outage N1.FLARE.EVENT.HP1
3/31/02 2:27 AM 3/31/02 3:44 AM 243 Compressor shut down repair underway Equipment Outage N1.FLARE.EVENT.HP1
3/31/02 8:40 AM 3/31/02 11: 10 AM 1362 Starting compressors. Equipment Outage N1.FLARE.EVENT.HP1
3/31/02 8:48 AM 3/31/02 11 :01 AM 191 Compressor startup. Equipment Outage N1.FLARE.EVENT.LP
3/31/02 1 :21 PM 4/1102 6:28 AM 381 Source is unidentified. investigating sources. Upset N1.FLARE.EVENT.LP
Total: 81283
:::::;:~ltilli.::~IÎ~I~:::~i.~~::~ijll:::lf::III~:~~::¡~i~:iij~I~~:lil:¡:lli:~I~IIII:ilij&::II:¡:~:::::¡::::::::::i:::i~:~:~:~i~iiiii~:~:~i¡:~i::¡i~:~i~:¡i¡:¡i¡:¡i:::i:::i::i ¡¡¡i:¡:::i:~:::~::i~:i:~~::::::~:::::::~~::~:i:~~i:¡iii:iiiiiiiiiiii~i~iiiiiiii:ii~i~i~:~i~iiiiiiii~~i:~~i~~iii~~i~~¡i::::~::¡:~¡i:::i: :::i::¡i¡::i:::¡::¡¡¡::i~:~i~iiiiiiiiiiii~~i~:~¡¡:ii::~i~iii¡:~:i:iii:iiiiiiiiiiii~i¡~:i:::::¡:¡¡::~:::i~:ii
Total: 0
Page 3 of 4
Gas Flaring Incident Report
BP Northstar
Run Date:
04-Apr-02
Mar-31-2002
Start DatelTime
End DatelTime
MCF
Volume
Incident/Cause Description
¡~j~::¡:~ijj~iø¡:~~~~~~::¡iìj~~t~i:':¡:~::¡:I~å~:¡:i~i:~li¡~~I~::!/:::::::j~ij:::i~:::j::~j~:¡j~j~j~j¡j~j:¡~::j~:~:¡~:j¡:¡¡:::j¡::j:::j~:~¡:j¡:~:~j¡~:¡:¡:¡:~:j:::j::::¡::¡¡i:i:¡:¡::¡¡¡::¡::::~¡:~:¡.:~::¡¡:¡:¡:~¡~:¡¡~:::¡j¡::¡::::¡::::
Total: 0
Page 4 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Field(s)
Northstar
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 4,247,460
3. Flared or vented less than 1 hour 695
4. Flared or vented ¡¡reater than 1 hour 60,899
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,581
6. Used for lease operations Assist 0
Fuel (at island) 244,573
Fuel (Caribou Crossin¡¡) 28,167
Fuel IPS#1 htr) 8452
7. Other 0
TOTAL items 1-7 4,592,827
8. NGL ¡¡as equivalent produced 0
9. Purchased ¡¡as 2,244,208
10. Transferred from:
11. Transferred to:
I hereby certify that thX::0ing is true and correct to the best of my knowledge.
Signature ~Q. ~ Title Mc·"{L-rP<x Date
Form 1 0-422
Rev. 4/95
MonthNear of Disposition
Apr-02
'Indicate contribution of each pool to total.
Pool Name lL;oae
Percent
1 . Safety
60,&<11 MCF ~,ø---
2. Lease
MCF
3. Conserv. Purposes
MCF
(~W~t'~
Commissi er Date
't.
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Volume flared less than 1 hour: 695
Volume flared greater than 1 hour: 60899
Run Date:
06-May-02
Gas Flaring Incident Report
BP Northstar
Apr-2002
Total Flared Volume: 61,594
Apr-30-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
Transmitter 4260 was found to be
frozen and giving
a false indication of a flare event.
Calibration
Calibration
Plant Shutdown from HP-B
Plant Shutdown
PCV 2121 Valve (Glycol Contactor) to
flare leaks
by.
PCV 2121 Valve ( Glycol Contactor) to
flare leaks
by.
PCV 2121 Valve ( Glycol Contactor) to
flare leaks
by.
Leaking PCV on contactor
Leaking PCV on contactor
Leaking PCV on contactor
Leaking PCV on contactor
4/4/02 11 :43 AM
4/7/027:44 AM
4/7/029:20 AM
4/8/02 9: 12 PM
4/8/02 9:40 PM
4/9/02 5:26 AM
4/9/02 7:26 AM
4/9/02 1 :32 PM
4/10102 12:37 PM
4/12/02 3:26 AM
4/12/02 2:28 PM
4/14/02 5:09 AM
4/17/022:12 AM
Total: 448
4/5102 8:00 AM
4/7/029:12 AM
4/8/02 5: 19 PM
4/9/02 12:07 AM
4/9/02 4:48 AM
4/9/02 7: 14 AM
4/10/0210:11 AM
4/10102 5:58 AM
4/11/02 10:43 PM
4/12/02 7:31 AM
4/13/02 10:20 PM
4/14/02 12:30 PM
4/30/02 11 :57 PM
441
24
735
193
875
141
1366
250
73
60
691
137
25524 LP compressor down for maintenance
Thaw and Calibrate transmitter
4260.
Calibrate transmitter
Calibrate Transmitter
Started Plant
Started Plant
W.O written to repair.....#
21705
W.O written to repair.....#
..
21705
W.O written to repair.....#
21705
Parts on order
Parts on order
Parts on order
Parts on order
Cut back to minimum rates
while replacing electric driver
motor
Equipment Outage
Equipment Outage
Eauipment Outage
Upset
Upset
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
Page 1 of 3
Gas Flaring Incident Report
BP Northstar
Run Date: 06-May-02 Apr-30-2002
MCF
Start DatelTime End Date/Time Volume Incident/Cause Description Remediation Taken Event Type Event Name
Cut back to minimum rates
while replacing electric driver
4/17/02 4:56 AM 4/19/02 1 1 :19 AM 8527 LP compressor down for maintenance motor Equipment Outage N1.FLARE.EVENT.HP1
LP compressor down for maintenance
& HPA shutdown due to GG fuel
4/19/02 2:24 PM 4/19/02 5:14 PM 1505 system trouble Started HPB. Equipment Outage N1.FLARE.EVENT.HP1
4/19/02 5:16 PM 4/25/02 8:31 PM 10993 LP compressor down for maintenance Cut rate to minimize flaring. Equipment Outage N1.FLARE.EVENT.HP1
Reduced rate to minimum while
4/25/02 8:51 PM 4/30/02 1 1:59 PM 6402 LP Compressor Shutdown LP overhaul continues Equipment Outage N1.FLARE.EVENT.HP1
Total: 57937
;·j:j¡.:it~ilijj:¡i~~I¡::~I¡i~~~6.¡Hj::~~:~lil~~~~j::ji:::fjil~¡:iá'~¡:_~~lijlj,jl¡::Ii.I¡:II:~:j:j:j:j:j:j:¡:¡:¡::¡::::::j:¡:¡:¡:¡:¡:¡:::~~¡:¡:~:¡:¡:¡:~:~¡~¡:¡::::::::j:¡:. ¡:¡:¡:::j:j:j:j:j:¡:::¡:¡::¡::¡¡::::::¡:~:~:~:~:¡:~:¡:j:~:::~:::~:¡::::¡¡i:::~::¡:~:::::j:j:j:j:j:::j:j:j:::¡:¡:~:~::¡¡:¡:¡:::¡::~~¡¡:: ::j:j:j:j:j:~:~:~:¡:~¡¡:~:~:¡¡~¡¡:¡~!:¡:¡:j:j:j:~:~:¡:¡:¡:¡:¡:~:¡:¡:~:~¡¡:¡:¡:¡~¡ij:j:::¡:¡:¡:¡:¡:¡:¡:¡:¡:~: :¡:~:~:~:¡i::j¡::j~j:~:j:::j:j:~:¡:¡:¡:¡:¡:::¡¡¡¡¡:~¡!¡:~!:¡:j¡j:::::¡:~:~:¡¡¡:~:¡:~:¡:¡:¡:::::~:¡:~¡¡:¡i:
Total: 247
4/15/2002 1:53 4/15/2002 2:02 14 Shut down for LP flare modifications planned Plant Integrity N1.FLARE.EVENT.HP1
depressured test separator for
4/15/2002 2:03 4/15/2002 2:20 32 maintenance. Upset N1.FLARE.EVENT.HP1
4/15/2002 2:35 4/15/2002 2:47 15 Shut down for LP flare modifications planned Plant Integrity N1.FLARE.EVENT.HP1
4/15/2002 2:43 4/15/2002 2:46 1 Shut down for LP flare modifications planned Plant Integrity N1.FLARE.EVENT.LP
4/15/2002 4:58 4/15/2002 5:06 1 Shut down for LP flare modifications planned Plant Integrity N1.FLARE.EVENT.LP
4/15/2002 5:08 4/15/2002 5:13 1 Shut down for LP flare modifications planned Plant Integrity N1.FLARE.EVENT.LP
4/15/2002 7:00 4/15/2002 7:15 2 Shut down for LP flare modifications planned Plant Integrity N1.FLARE.EVENT.LP
4/16/2002 17:26 4/16/2002 17:36 34 Shut down for LP flare modifications planned Plant Integrity N1.FLARE.EVENT.HP1
4/16/2002 17:45 4/16/2002 17:49 2 Shut down for LP flare modifications planned Plant Integrity N1.FLARE.EVENT.HP1
4/17/2002 3:52 4/17/2002 4:04 29 Bringing in wells Loaded up the HP Equipment Outage N1.FLARE.EVENT.HP1
Page 2 of 3
.
Gas Flaring Incident Report
BP Northstar
Run Date: 06-May-02 Apr-30-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
4/1 7/2002 4:25 4/1 7/2002 4:52 1 1 6 Bringing in wells LP compressor purging Equipment Outage N1 .FLARE.EVENT.HP1
~:i:i¡¡¡:~t¡¡II:¡II~~~:~:llji.I~~:Ρi~~:~¡¡llij~¡¡¡I~¡¡1.1~11~1:::j,_:¡:I~~¡¡::¡::¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡:i¡i::¡¡¡¡¡¡¡:¡¡¡¡¡¡¡¡¡¡¡¡:i:i:¡:¡¡¡:::¡:¡¡¡:¡¡¡¡¡¡¡¡¡::¡¡¡¡:¡¡¡¡:¡¡¡:¡¡¡¡:::¡¡¡:¡::::¡¡¡:¡i~:~:¡:¡¡¡:::¡:::::¡¡¡:¡¡¡:¡¡¡¡¡¡¡I: ::¡¡:¡:i:¡¡¡¡¡¡:¡¡¡¡¡¡¡¡¡¡:¡:¡¡::¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡:¡¡¡i:!¡:¡::¡¡¡¡¡:¡¡i¡¡¡¡¡¡¡¡¡:¡!!¡¡:¡¡:~:¡¡~:~¡~:~¡¡¡¡¡¡¡i¡:::¡¡¡¡:¡~:¡~:¡¡¡:¡¡¡¡¡¡¡ ¡!:¡¡¡¡¡¡:¡¡¡¡¡¡¡¡~¡~:¡:~¡!¡¡¡¡¡¡¡¡:¡¡¡¡¡¡¡¡¡:¡¡¡i¡:::::¡¡::~:¡¡~:~¡¡¡¡¡~¡¡i:¡:¡¡¡¡¡¡¡¡¡::¡¡¡:¡¡¡:¡¡~¡~¡:¡!¡
Total: 2962
Source is believed to be Glycol vent Continued investigation of other
4/1/2002 6:46 4/4/02 3:38 AM 1 483 blower. Normal operation. possible sources. Opacity N1 .FLARE.EVENT.LP
4/1 5/2002 3: 1 7 4/1 5/02 4:48 AM 78 Shut down for LP flare modifications planned Plant Integrity N1 . FLARE. EVENT.LP
"
4/1 5/2002 3:27 4/1 5/02 6:40 AM 1 385 Shut down for LP flare modifications planned Plant Integrity N1 .FLARE.EVENT.HP1
4/1 5/2002 7:59 4/1 5/02 9:08 AM 1 6 Shut down for LP flare modifications planned Plant Integrity N1 .FLARE.EVENT.LP
Page 3 of 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Operator
BP Exploration (Alaska) Inc.
Field(s)
Northstar
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 3,420,274
3. Flared or vented less than 1 hour 947
4. Flared or vented ¡¡reater than 1 hour 227,707
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,759
6. Used for lease operations Assist 0
Fuel (at island) 249,128
Fuel (Caribou Crossin¡¡) 26,346
Fuel (PS#1 htr\ 7408
7. Other 0
TOTAL items 1-7 3,934,569
8. NGL ¡¡as equivalent produced 0
9. Purchased ¡¡as 1,438,453
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature átuu- ~ Title Pfl/lLA'uJy~t·'oate "J~ DZ-
Form 1 0-422
Rev. 4/95
'Indicate contribution of each pool to total.
Pool Name (.;oae
Percent
1. Safety '?-17, fO-; MCF Œp-
2. Lease MCF
3. Conserv. Purposes MCF
"1'VJ{/)7_
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Gas Flaring Incident Report
BP Northstar
May-2002
Volume flared less than 1 hour:
Volume flared greater than 1 hour:
947
227707
Run Date:
04-Jun-02
Total Flared Volume: 228,654
May-31-2002
Start Date/Time
MCF
Volume
End Date/Time
:::.¡:¡::ij:~:::;::i~ijlij::~jj6.j¡;;.i¡ii¡~¡m~:~¡if:::::::::~:::~~¡¡::ja.:::j::::H;a.f:::::¡~:~¡::::::¡::::::::::¡:
Total: 947
.,'....... :.;:;:;::.:::.:::.:::.:';.::;:;::....:.;.::::::.:::::.:::::::::::::;:':;:':;:", .:.:-:.:.:.:;:;:;:.:::::.;.:;:.:;:.;.
¡:~.~:¡::06:::j¡bJld::äW;mi;:(:::f.ø.~.¡f¡16~ij:H::¡.~¡~:¡¡i¡i
5/1/02 12:01 AM 5/31/02 11 :58 PM
52479
LP Motor
5/1/0212:01 AM 5/5/02 1: 1 0 PM 46204 Plant SID due to HPA compo Problems
5/5/02 1 :35 PM 5/6/02 12:55 AM 1638 Plant SID due to HPA compo Problems
5/6/02 1 :15 AM 5/6/02 9:49 AM 1375 Plant SID due to HPA compo Problems
5/6/02 9:58 AM 5/6/02 5:02 PM 2288 Plant SID due to HPA compo Problems
5/6/025:09 PM 5/7/02 8:27 AM 3584 Low level on crude stabilizer
LP compressor motor failure &
replacement. HP flaring from IP
5/7/02 8:34 AM 5/9/02 7:33 AM 3873 separator
LP compressor motor failure &
replacement. HP flaring from IP
5/9/02 10:58 AM 5/9/02 4:01 PM 799 separator
LP compressor motor failure &
replacement. HP flaring from IP
5/9/02 5:00 PM 5/9/02 8:08 PM 5 separator
LP compressor motor failure &
replacement. HP flaring from IP
5/10102 11: 19 AM 5/11/02 11 :04 AM 1489 separator
LP compressor motor failure &
replacement. HP flaring from IP
5/11/02 11 :35 AM 5/12/02 11 :29 AM 1989 separator
Remediation Taken
:j::~:::¡¡::~¡::~¡~:¡¡¡:::¡:¡:¡:::::::~:::~¡~:~:¡:::::!:¡¡¡:!:::¡:¡:::::¡:¡:~¡¡:~:¡:¡:~:~:¡:¡:¡:¡::::¡::~:!:!¡¡:¡¡¡:¡¡:::j¡::::::j¡::::
Replace motor Equipment Outage N1.FLARE.EVENT.LP
HPA repairs made. Equipment Outage N1.FLARE.EVENT.HP1
HPA repairs made Equipment Outage N1.FLARE.EVENT.HP1
HPA repairs made Equipment Outage N1.FLARE.EVENT.HP1
HPA repairs made Equipment Outage N1.FLARE.EVENT.HP1
UpsetlOpacity N1.FLARE.EVENT.HP1
Repairing LP compressor Equipment Outage N1.FLARE.EVENT.HP1
Repair LP compressor Equipment Outage N1.FLARE.EVENT.HP1
Repairing LP compressor Equipment Outage N1.FLARE.EVENT.HP1
Repairing LP compressor Equipment Outage N1.FLARE.EVENT.HP1
Repairing LP compressor Equipment Outage N1.FLARE.EVENT.HP1
Page 1 of 2
Gas Flaring Incident Report
BP Northstar
Run Date: 04-Jun-02 May-31-2002
MCF
Start Date/Time End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
5/13/02 5:00 AM 5/13/02 6:47 AM 221 Plant shutdown. Restart plant. Upset/Opacity N1.FLARE.EVENT.HP1
LP Compressor Down, bringing on Start Compressor, Completed
5/13/02 11: 13 PM 5/14/02 11 :45 AM 4836 wells. bringing on wells. Equipment Outage N1.FLARE.EVENT.HP1
Plant start up after LP motor
5/18/02 6:02 PM 5/21/026:14 PM 5534 Lp Compo motor repairs repairs Equipment Outage N1.FLARE.EVENT.HP1
Plant start up after LP motor
5/19/029:21 PM 5/21/02 10:21 AM 98813 Lp Compo motor repairs repairs Equipment Outa e N1.FLARE.EVENT.HP2
Plant start up after LP motor
5/21/027:56 PM 5/21/02 11 :49 PM 942 Lp Compo motor repairs repairs Equipment Outa e N1.FLARE.EVENT.HP1
Plant start up after LP motor
5/22/02 2:46 AM 5/22/02 3:47 AM 80 Lp Compo motor repairs repairs Equipment Outage N1.FLARE.EVENT.HP1
5/22/02 4: 17 AM 5/22/02 5:50 AM 527 Lp Compo motor repairs LP Compo repairs Equipment Outage N1.FLARE.EVENT.HP1
5/23/02 5:53 AM 5/23/02 8:21 AM 935 OSD shutdown Upset N1.FLARE.EVENT.HP1
5/23/02 1 :35 PM 5/23/022:51 PM 96 PLC failure Upset N1.FLARE.EVENT.HP1
Total: 227707
Total: 0
.:':i:'¡::I~~¡II¡:liil~·::j~~I::~jHlij:·:I::::::::.:ij~~::~i:::j:::·ij~Îf:¡í~:~:il::i¡~ij~~6.;·:.Î::MÞ.t::::::\:::¡:::::::::::::~:::¡:::::::¡:::¡:::¡:¡:¡:::j¡¡¡¡:::::::¡:~:¡:::::::¡:\:
:::~·:·::·ÞIIII::ij~II::II~il~II:::j:¡::II.¡~::~I~::I~iil~II~:~llì¡::I¡~~¡:::::~:::¡:¡:::¡~¡¡::¡:::::::::¡:::¡:::::~:¡::·~::'!'!.::~::.~:::~:j:::¡,!:¡¡::::::¡:i:¡:::¡:¡:¡::¡¡¡::::::¡:!:!::::!::!¡:~:~:::¡~::::::¡::¡:!¡¡::¡::
Total: 0
Page 2 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Operator
BP Exploration (Alaska) Inc.
Field(s)
Northstar
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 5,507,631
3. Flared or vented less than 1 hour 7,161
4. Flared or vented ¡¡reater than 1 hour 91,618
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,670
6. Used for lease operations Assist 0
Fuel (at island) 266,257
Fuel (Caribou Crossin¡¡) 23,282
Fuel IPS#1 hÛ\ 8910
7. Other 0
TOTAL items 1-7 5,907,529
8. NGL ¡¡as equivalent produced 0
9. Purchased ¡¡as 1,437,388
10. Transferred from:
11. Transferred to:
Signature
foregoing is true and correct to the best of my knowledge.
Title ~(2, TY\-~ Date 1 (17/0t.
Form 10-422
Rev. 4/95
Month/Year of Disposition
Jun-02
'Indicate contribution of each pool to total.
Pool Name L.oae Percent
1. Safety q(/~S MCF ~
2. Lease MCF
3. Conserv. Purposes MCF
ú.~u1:~ ~
Commis ner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Gas Flaring Incident Report
BP Northstar
Jun-2002
Volume flared less than 1 hour: 7161
Volume flared greater than 1 hour: 91618
Run Date:
15-Jul-02
Start DatelTime
MCF
Volume
End DatelTime
:~~¡~~:~:û~:t~~~~lij:¡!f.¡it¡~:~.~:iâ~~:~:~~:~::i:::~:::~Ii¡:~ij:j::fji~~~:~:~:~:~:~:~:~:~:~:~:~:¡~~:::
Total: 7161
...,....................... . . .................... ..................................................................................................................................'. ..........................................
:~:::i~:¡I~~:\I~Ia.:~lì~mi.:i::~:iíjÎ~:~~j~I¡I~~¡¡:Mmt¡¡::::~:~~::~:~:~:~:~:~:~:~:~:~¡~~~¡~~~~~¡~¡~~~~~¡~¡~~~¡~¡~¡~¡~r¡~:~:~:~¡~¡¡:::¡:¡:¡:¡::¡::::¡¡:¡::~:~:~:~:~:~:~:¡:~:~¡~:~:~:~¡~:~¡¡:~¡~:¡~:~:~~:¡~~¡~¡~¡~¡~¡~¡~:~¡~:~:¡:¡:¡:¡:¡¡¡:¡:¡:~:::::;;:~:::::¡:~:~:~:~:~:~:~~::~:~:¡:¡:¡
Minimum flare value is .5 MMSCFD.
This is below the minimum safety flare
35648 with purge and pilot
155 HPA seal gas rupture disk failure
24713 HPA seal gas rupture disk failure
259 Troubleshoot NS-8 SSSV Problems
6/1/02 12:0~
6/2/02 6:20 PM
6/2/02 9:05 PM
6/7102 12:48 PM
6/30/02 11 :58 PM
6/2/02 8:32 PM
6/7102 11 :45 AM
6/71023:51 PM
plant shut down due to work been
performed on the WHRU causing
6/8/02 11 :59 AM 6/8/021 :11 PM 230 excess amount of NGL to be produced.
6/9/0212:10 PM 6/9/022:32 PM 1420 Solars tripped off line causing ESD
6/9/02 4: 12 PM 6/9/026:31 PM 293 Solars tripped off line causing ESD
Plant Shutdown due to HP-B
6/11/02 8:33 PM 6/11/02 1 0: 12 PM 1238 instrument problems.
6/13/02 8:37 AM 6/13/02 10: 11 AM 289 LP compressor down
6/13/02 11 :45 AM 6/13/02 9:04 PM 1682 LP compressor down.
6/201026:39 PM 6/20/02 11: 1 0 PM 1804 LP compressor tripped off line
HPB comp 4th stage dish transmitter
6/21/02 1 :07 PM 6/21/024:02 PM 361 PI-2335 failure.
HPB comp 4th stage dish transmitter
6/21/024:23 PM 6/21/026:38 PM 346 PI-2335 failure.
HPB comp 4th stage dish transmitter
6/21/027:11 PM 6/21/029:25 PM 775 PI-2335 failure.
HPB comp 4th stage dish transmitter
6/21/029:36 PM 6/22/02 1 :42 AM 1497 PI-2335 failure.
Event Type
Event Name
m~~~tw~t~tt~~~t~jt~jt~j~tt?????tj~ttj~~r~i~tj~jj~j~j¡¡¡j¡j¡j¡j¡j¡j¡j¡j¡j¡j¡j¡t~¡i¡t;¡i¡;¡j¡j¡j¡j¡j¡jmjmjmttt;tit;rrr;
i?;m;i?;it;ittt;i;ittt;tti;i¡i;iji;i;i;i;i;i;itt;i;r¡¡;i;;¡i¡;¡ij¡;¡i¡;¡j¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡tt¡~¡~~W~¡i¡¡~¡¡¡~¡~¡~¡¡¡mt¡tt¡¡ttttt~t
None required Plant Integrity N1.FLARE.EVENT.LP
Monitor Equipment Outage N1.FLARE.EVENT.HP1
Monitor Equipment Outage N1.FLARE.EVENT.HP1
Shut in NS-8. Upset N1.FLARE.EVENT.HP1
Diverted Solar B exhaust back
into waste heat Upset/Opacity N1.FLARE.EVENT.HP1
Restarted Solars Upset N1.FLARE.EVENT.HP1
Restarted Solars Upset N1.FLARE.EVENT.HP1
Repair and Re-start Upset N1.FLARE.EVENT.HP1
Trying to restart it. Upset N1.FLARE.EVENT.HP1
Trying to restart it. Upset N1.FLARE.EVENT.HP1
Restarted LP compressor Equipment Outage N1.FLARE.EVENT.HP1
Cut rates until transmitter can
be replaced. Equipment Outage N1.FLARE.EVENT.HP1
Cut rates until transmitter can
be replaced. Equipment Outage N1.FLARE.EVENT.HP1
Cut rates until transmitter can
be replaced. E uipment Outage N1.FLARE.EVENT.HP1
Cut rates until transmitter can
be replaced. Equipment Outage N1.FLARE.EVENT.HP1
Page 1 of 2
Gas Flaring Incident Report
BP Northstar
Run Date:
15-Jul-02
MCF
Start DatefTime End DatefTime Volume Incident/Cause Description
HPB comp 4th stage dish transmitter
6/22/02 4:23 AM 6/22/02 1 :42 PM 11510 PI-2335 failure.
Inlet scrubber LI-2112 failed high
6/23/02 11 :59 AM 6/23/02 1:49 PM 322 resulting in OSD
HPB shut down on High 4th stage
6/25/02 12:21 PM 6/25/02 2:46 PM 1899 scrubber level
HP B trip due to 5th stage surge
6/27102 9:02 AM 6/27102 12:02 PM 1478 problem
6/2710212:23 PM 6/27102 5:50 PM 4111 HP B surge repair.
6/27102 6:38 PM 6/271028:12 PM 284 LP compressor SID
6/28/02 8:40 PM 6/28/02 10:41 PM 197 test sep. flare valve problems
6/29/02 2:59 PM 6/29/02 4:31 PM 385 Fire detect on HPB BESD plant
6/29/02 5:35 PM 6/29/02 9:08 PM 723 Fire detect on HPB BESD plant
Total: 91618
~~:~:¡:!¡llijll¡~III~¡!ijl~li:~6.IH:::I~iil~II::ji.¡:¡~!~!~Ii.¡~::lijl!~!lIi!I_~jiji:~_ii:II!¡!~¡~:~!::¡:~:¡::~:::~::1~1·?¡:¡:¡:¡:¡:¡¡¡:¡:¡:¡:¡:~~!¡:~:~:~¡i:~:i!~!i:¡
Total: 0
Jun-30-2002
Remediation Taken
Cut rates until transmitter can
be replaced.
Cut production to minimize
flaring> Replaced LI-2112
OSD production
restart LP
SI production to minimize
flaring
SI production to minimize
flaring
Event Type Event Name
Equipment Outage N1.FLARE.EVENT.HP1
Equipment Outage N1.FLARE.EVENT.HP1
Equipment Outage N1.FLARE.EVENT.HP1
Equipment Outage N1.FLARE.EVENT.HP1
Equipment Outage N1 FLARE.EVENT.HP1
Equipment Outage N1.FLARE.EVENT.HP1
Equipment Outage N1.FLARE.EVENT.HP1
Equipment Outage N1.FLARE.EVENT.HP1
Equipment Outage N1.FLARE.EVENT.HP1
:::¡i!i!i!i!i!i!i!i!i!iiiii~~~:¡:¡:¡::::~:::i:i:::~:~:~:i!i:~!~!i:i:i:i!¡:~i~~¡¡:~¡¡¡:~¡i!i!i:i!i!i!i!i:i!i!!~:~:~:::¡:.¡.~:j~:~!~¡~~:~:~:::¡i¡¡¡::~!i!i!i!i!i!i!i!i!i:~i::¡:~:~!¡:~::::::::!::~!~:i!¡:~!:::~.:~¡i~~¡:
Total: 0
Page 2 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Field(s)
Northstar
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 6,635,548
3. Flared or vented less than 1 hour 1,961
4. Flared or vented ¡¡reater than 1 hour ~~ 3ß,ß~(."
(Supplemental report requlred··See 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,759
6. Used for lease operations Assist 0
Fuel (at Island) 381,025
Fuel (Caribou Crossin¡¡) 30,833
Fuel (PS#1 hÚ¡ 7434
7. Other 0
TOTAL items 1-7 7,098,424
8. NGL gas equivalent produced 0
9. Purchased ¡¡as 2,179,259
10. Transferred from:
11. Transferred to:
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Q(). ~ ,/ (}#'\ fL&. Title M{.) tt T ~ Date ti Iv.! œ
Form 10-422
Rev. 4/95
Month/Year of Disposition
Jul-02
'Indicate contribution of each pool to total.
Pool Name voae
Percent
"> ..........
>I > i
>.
1. Safety '3 q, Ý¿' Ý MCF
2. Lease MCF
3. Conserv. Purposes MCF
u".,O"jJ'~ 'Ivilw
Commiss ner Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Gas Flaring Incident Report
BP Northstar
Jul-2002
Volume flared less than 1 hour:
Volume flared greater than 1 hour:
1961
38864
Run Date:
Total Flared Volume: 40,825
Jul-31-2002
13-Aug-02
Start DatelTlme
:¡:::¡:~ø.:~:::::::::¡i~~I::lli:::::::liif::ii~~~:::.~:¡¡¡::::::'.
During normal operation checked all potential
high volume sources of gas that might be
leaking into the LP flare system. No leakage
into the LP flare system was found. Checked t
ensure flow element for the LP flare system
was indicating correctly. Loaded new meter
software, checked meter parameters and
calibration. Retumed meter to service. Meter
was reading higher than actual flow present.
7/1/0212:01 AM 7/31/02 11 :58 PM
7/2/0212:48 PM 7/2/022:05 PM
7/5/0210:47 PM 7/6/0212:59 AM
7/15/028:19 AM 7/15/0212:30 PM
7/16/022:14 PM 7/16/025:30 PM
7/16/025:34 PM 7/16/02 7:59 PM
28027 Minimum flare is above .5 MMSCFD
Plant Inte rity
294 HPB shut down on a Woodward signal Attempt to restart Equipment Outage
5th stage discharge PSV lifting
236 prematurely lowered injection rate Upset
Lp compressor down from wells being
1079 shut in. Attempting to start Lp compressor. Upset
299 Calibrated flare transmitters. Calibrated transmitters, retumed to service. Equipment Outage
22 Calibrated flare transmitters Calibrated transmitters, retumed to service. Equipment Outage
7/16/028:28 PM
Depressurer,production to flare for NS-
27 conversion. Completed activity
3196 and retumed header to normal pressure.
Completed activity and retumed header to
normal pressure.
7/20102 8:26 PM
7/201028:31 PM
Depressurer production to flare for NS-
333 27 conversion.
Completed activity and retumed header to
normal pressure.
7/20/02 10:32 PM
7/2010210:39 PM
7 LP compressor down for seal repair
Reduced rates to minimum to minimize flaring
7/21/02 1 :01 AM
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
Page 1 of 2
Run Date: 13-Aug-02
MCF
Start Date/TIme End Date/TIme Volume
7/21/021 :26 AM 7/21/022:56 AM 2
7/21/024:31 AM 7/21/026:41 AM 162
7/21/028:45 AM 7/21/025:46 PM 375
7/21/025:47 PM 7/22/025:09 AM 2407
7/22/025:19 AM 7/22/027:04 AM 152
7/26/026:00 PM 7/26/027:15 PM 556
7/26/028:06 PM 7/26/0210:00 PM 133
7/27/023:52 AM 7/27/025:59 AM 647
7/28/02 2:04 PM 7/28/024:13 PM 809
7/29/02 10:24 AM 7/29/02 12:34 PM 130
/' ~
Total: L1Bsê4
'- ../
Gas Flaring Incident Report
BP Northstar
Jul-31-2002
Incident/Cause Description
Remediation Taken
Event Type
LP compressor down for seal repair Reduced rates to minimum to minimize flaring Equipment Outage
LP compressor down for seal repair Reduced rates to minimum to minimize flaring Equipment Outage
LP compressor down for seal repair Reduced rates to minimum to minimize flaring Equipment Outage
LP compressor down for seal repair
HP B Startup...Purge
HP B shutdown
HP B shutdown
Reduced rates to minimum to minimize flaring
Started Compressor
restart
restart
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
Bumped flare while bringing on a well
Facility restart following planned
shutdown
Plant BESD
cut back on well
Upset
Planned
reset/restart.
Plant InteQrity
Equipment Outage
'31)~(~
::~:~~:if~ij61~:li_:¡I;'¡~:i~I~i.~¡~ÎJI.:~¡i:~:~¡II:~j6ij::lij~:I~iijijt~¡::ilij~:M~i~:¡:~:::~::::~:::~:::~:~:~:~::~;:::::::~::~:~::~~:::~:::~¡:¡~::¡~:~:::~:::~:~;~::
Event Name
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
Total: 210
7/25/200210:21 7/25/200210:30 39 Flaring due to shutdown Upset/Opacity N1.FLARE.EVENT.HP1
7/27/20026:50 7/27/2002 7:06 1 Planned Maintenance Shutdown Planned Equipment Outage N1.FLARE.EVENT.HP1
7/27/20027:16 7/27/20027:35 28 Planned Maintenance Shutdown Planned Equipment Outage N1.FLARE.EVENT.HP1
7/27/20028:59 7/27/20029:23 32 Planned Maintenance Shutdown Planned Equipment Outage N1.FLARE.EVENT.HP1
All flare events for the 27th were related
to a
7/27/200210:10 7/27/200211 :08 110 planned plant shutdown. Equipment Outage N1.FLARE.EVENT.HP1
:~:::::~þ.¡¡H~ii¡~i'lm::¡il¡~mi:~j¡::¡iIi.::I~:I~~~i¡I¡:liij::Miji::¡~:¡::~::¡~:~:~¡~~~:~¡~~:~~:~~~:~¡~¡~¡~¡¡~~¡¡~~¡~::~¡~¡::~¡~¡::~::::::~:~~::'::~:::::::~:¡:::::~::::i:¡¡:¡:~::::::::~::¡:::¡~:¡:~:¡~~~¡~:
Total: 0
Page 2 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Field(s)
Northstar
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 7,138,193
3. Flared or vented less than 1 hour 11 ,398
4. Flared or vented ¡¡reater than 1 hour 41,844 ,/
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,759
6. Used for lease operations Assist 0
Fuel (at island) 304,917
Fuel (Caribou Crossin¡¡) 31,805
Fuel IPS#1 htr) 8207
7. Other 0
TOTAL items 1-7 7,539,123
8. NGL ¡¡as equivalent produced 0
9. Purchased ¡¡as 1,975,528
10. Transferred from:
11. Transferred to:
I hereby ce'jif{ that t
Signature kG.
foregoing is true and correct to the best of my knowledge.
Title mG a... T A: X Date q In lo"t.
Form 1 0-422
Rev. 4/95
'Indicate contribution of each pool to total.
Pool Name I (,;oae
Percent
1. Safety
2. Lease
MCF
3. Conserv. Purposes
MCF
II /2-1 /02-
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Gas Flaring Incident Report
BP Northstar
Aug-2002
Volume flared less than 1 hour:
Volume flared greater than 1 hour:
11398
41844
Run Date:
17 -Sep-02
Total Flared Volume: 53,242
Aug-31-2002
Start DatelTime
:::i:i:iø.::::)::¡¡¡¡¡:ii~¡I:::~:i:~~iWi:~¡ð.::~iii6.àii:¡:::::::¡:¡
8/1/0212:01 AM
8/17/02 4:37 PM
15700
Con't from last month - During normal
operation checked all potential high volume
sources of gas that might be leaking into the
LP flare system. No leakage into the LP
flare system was found. Checked to ensure
flow element for the LP flare system was
indicating correctly. Loaded new meter
software, checked meter parameters and
calibration. Retumed meter to service.
Meter was reading higher than actual flow
present. (. "A hln...
...1"'L\.(~N\.C~
Equipment Outage
N1.FLARE.EVENT.LP
8/2/0210:17 AM
8/2/024:17 PM
Power failure when attempting to start Lp
compressor caused a plant ESD.
Restarted generators and brought plant
1365 back online.
Restarted generators and brought plant
back online.
Upset
N1.FLARE.EVENT.HP1
8/2/026:25 PM
8/6/02 11 :08 AM
8/6/025:14 PM
8/2/029:38 PM
8/6/0212:46 PM
8/6/026:25 PM
618 Waiting for Lp startup after plant ESD
463 Testing and tuning on HPB
784 HPB hit T5 temp causing flare
Holding at minimum rates until LP
compressor is started
Set pressure control
Upset
Upset
Upset
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
8/8/02 1 :08 AM
8/8/022:49 AM
LP compressor down due to high level in
1 st stg. suction scrubber while trying to Switched back to TEG bumers and restated
196 get the FAF WHRU working LP compressor. Equi ment Outage
N1.FLARE.EVENT.HP1
Page 1 of 4
Gas Flaring Incident Report
BP Northstar
Run Date: 17 -Sep-02 Aug-31-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
LP compressor down due to high level in
1 st stg. suction scrubber while trying to Switched back to TEG bumers and restated
8/8/02 2:52 AM 8/8/02 3:54 AM 109 get the FAF WHRU working LP compressor. Equipment Outage N1.FLARE.EVENT.HP1
Minimum rates while working on NS-27 Emission test FAF, repair NS-27 flow line
8/8/02 11 :55 AM 8/8/024:59 PM 323 flow line and FAF and restart facility Equipment Outage N1.FLARE.EVENT.HP1
LP compressor failed start due to
8/8/028:57 PM 8/8/0211 :16 PM 1163 compressor logic Repaired logic Equipment Outage N1.FLARE.EVENT.HP1
LP compressor failed start due to
8/8/02 11 :20 PM 8/9/0212:22 AM 91 compressor logic Equipment Outage N1.FLARE.EVENT.HP1
LP compressor failed start due to
compressor logic
8/9/0212:26 AM 8/9/022:51 AM 193 Attempt restart Equipment Outage N1.FLARE.EVENT.HP1
HP compressor down while trying to tune
8/9/024:05 PM 8/9/026:38 PM 2700 recycle valve Restart HP B compressor Equipment Outage N1.FLARE.EVENT.HP1
8/19/02 3:02 AM 8/19/024:25 AM 142 Calibration of flow transmitter Equipment Outage N1.FLARE.EVENT.LP
8/19/02 3:03 AM 8/19/024:38 AM 223 Calibration of flow transmitter Equipment Outage N1.FLARE.EVENT.HP1
8/19/024:45 AM 8/19/02 5:54 AM 199 Equipment Outage N1.FLARE.EVENT.HP1
NS-14 SSSV replacement shuting in and
8/23/02 9:50 AM 8/23/021 :12 PM 34 bring back on line Upset N1.FLARE.EVENT.LP
Prepping for HPA> opening therrninol up
to users air in system from PSE failure
Lost Therrninol pumps low pressure
causing NGL upset, LP Compo problems
8/23/02 1 :26 PM 8/23/02 6:33 PM 93 and plant SID Upset N1.FLARE.EVENT.LP
Prepping for HPA> opening therrninol up
to users air in system from PSE failure
Lost Therrninol pumps low pressure
causing NGL upset, LP Compo problems
8/23/02 8:17 PM 8/23/02 9:26 PM 120 and plant SID Upset N1.FLARE.EVENT.LP
Prepping for HPA> opening therrninol up
to users air in system from PSE failure
Lost Therrninol pumps low pressure
causing NGL upset, LP Compo problems
8/23/028:43 PM 8/23/02 9:46 PM 99 and plant SID Upset N1.FLARE.EVENT.HP1
Page 2 of 4
Gas Flaring Incident Report
BP Northstar
Run Date: 17 -Sep-02 Aug-31-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
Prepping for HPA> opening therminol up
to users air in system from PSE failure
Lost Therminol pumps low pressure
causing NGL upset, LP Compo problems
8/23/02 10:28 PM 8/23/0211 :43 PM 233 and plant SID Upset N1.FLARE.EVENT.HP1
HPA Camp gas leak problems>
8/24/02 1 :38 PM 8/24/022:49 PM 30 attempted starts Equipment Outage N1.FLARE.EVENT.LP
HPA Comp gas leak problems>
8/24/029:00 PM 8/24/02 10:22 PM 10 attempted starts Equipment Outage N1.FLARE.EVENT.LP
8/25/02 11 :27 AM 8/25/028:02 PM 132 HPA bleed down for safeout Equipment Outage N1.FLARE.EVENT.LP
8/25/028:36 PM 8/25/0211 :19 PM 31 HPA bleed down for safeout Equipment Outage N1.FLARE.EVENT.LP
8/25/0211 :27 PM 8/26/02 2:26 AM 40 HPA bleed down for safeout Equipment Outage N1.FLARE.EVENT.LP
8/26/024:24 PM 8/26/02 5:38 PM 20 HPA bleed down for safeout Equipment Outage N1.FLARE.EVENT.LP
8/26/027:26 PM 8/26/02 9:59 PM 40 HPA bleed down for safeout Equipment Outage N1.FLARE.EVENT.LP
8/26/0210:14 PM 8/2710212:13AM 19 HPA purge for safe-in Equipment Outage N1.FLARE.EVENT.LP
8/271026:29 AM 8/271028:03 AM 26 HPA purge for safe-in Equipment Outage N1.FLARE.EVENT.LP
8/2710210:12 AM 8/27102 11 :18 AM 14 HPA purge for safe-in Equipment Outage N1.FLARE.EVENT.LP
8/27/02 1 :09 PM 8/2710210:36 PM 23 Equipment Outage N1.FLARE.EVENT.HP1
8/27/022:44 PM 8/271024:24 PM 28 Equipment Outage N1.FLARE.EVENT.LP
8/27102 11 :25 PM 8/28/02 1 :36 AM 2 test test point Equipment Outage N1.FLARE.EVENT.HP1
8/28/0212:20 AM 8/28/022:00 AM 0 Power Outage restart generator Equipment Outage N1.FLARE.EVENT.LP
8/28/02 4:57 AM 8/28/02 7:25 AM 44 NS·14 brought on line- LP compressor picked up load Upset N1.FLARE.EVENT.LP
8/28/025:24 PM 8/29/02 8:29 AM 56 Unknown Equipment Outage N1.FLARE.EVENT.HP1
8/29/02 10:04 AM 8/29/022:11 PM 5216 HPB shut down Upset N1.FLARE.EVENT.HP1
8/29/025:26 PM 8/29/02 6:27 PM 478 Opening wells after BESD Upset N1.FLARE.EVENT.HP1
8/29/026:29 PM 8/29/02 8:53 PM 408 Opening wells after BESD Upset N1.FLARE.EVENT.LP
8/29/02 6:34 PM 8/29/02 9:07 PM 240 Opening wells after BESD Upset N1.FLARE.EVENT.HP1
8/30/02 1 :07 AM 8/301023:19 AM 35 Unknown none Upset N1.FLARE.EVENT.LP
8/301029:38 AM 8/30/024:07 PM 4426 Plant Shutdown. Equipment Outage N1.FLARE.EVENT.HP1
8/30/02 9:46 AM 8/301023:26 PM 475 Plant Shutdown. Equipment Outage N1.FLARE.EVENT.LP
8/31/0212:47 PM 8/31/024:16 PM 364 LP Compressor SID. Equipment Outage N1.FLARE.EVENT.LP
8/31/027:41 PM 8/31/0210:35 PM 471 LP Compressor Down. Restart. Equipment Outage N1.FLARE.EVENT.LP
8/31/027:41 PM 9/1/0212:49 AM 1924 HPB shut down Equipment Outage N1.FLARE.EVENT.HP1
Total: 39400
Page 3 of 4
Gas Flaring Incident Report
BP Northstar
Run Date:
17 -Sep-02
Incident/Cause Description
8/29/2002 11 :24
8/31/2002 1 :20
Total:
8/29/2002 11 :36
8/31/20022:00
25
15
10
HP Compressor SID.
Loading Compressor.
Start DatelTime
End DatelTime
::::::::i¡i~II::I~Jil::¡il:II:I~::i:rlt:I::i::¡II::¡i~!:1¡ì::ii:ijl¡H:::::::i.~ii¡:MI:::::!:::::i:::!:::!:::!:!:::i:!:::!:::!!!!:!::::::!:::!:::::::::::!:::!:::!:¡::Ii
::::::::ii¡~ijl::li_::IIi.ij¡::::J~i::i:::I¡f:~f,::Ii.~~I¡ij:(i:~i¡ij::I~j,:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::i:::::::i~i~i:\:::::i:::j:::::::::~:::~:i::!::!:j:~!i:i:::::i!:!i!:::::
8/30/2002 17:32
8/30/2002 17:34
8/31/20025:36
Total:
8/31/02 7:36 PM
8/30102 11 :05 PM
8/31/02 6:48 AM
2444
1778
640
26
Leaking SDV
Purging Compressor.
Unknown.
Start Compressor.
UpseVOpacity
Equipment Outage
Opacity
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
Page 4 of 4
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Operator
BP Exploration Alaska) Inc.
Field(s)
Northstar
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 5,096,263
3. Flared or vented less than 1 hour 10,997
4. Flared or vented ¡¡reater than 1 hour ~ 5'=-1 1'3·z.".-
(Supplemental report required--See 20 AAC 25.235)
5. Pilot and pur¡¡e 2,670
6. Used for lease operations Assist 0
Fuel (at island) 259,073
Fuel (Caribou Crossin¡¡) 30,582
Fuel (PS#1 hÚ\ 7312
7. Other 0
TOTAL items 1-7 5,463,031
8. NGL ¡¡as equivalent produced 0
9. Purchased gas 1,802,029
10. Transferred from:
11. Transferred to:
Signature
Title fY'.6(L T {)ex
Date 10" (PtD7..
Form 1 0-422
Rev. 4/95
'Indicate contribution of each pool to total.
Pool Name vode
Percent
1 . Safety
;-" 13z..-MCF ;JßL-
,
2. Lease
MCF
3. Conserv. Purposes
MCF
\ ð'J1.J<>ð
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
Gas Flaring Incident Report
BP Northstar
Sep-2002
Volume flared less than 1 hour: 1 0997
Volume flared greater than 1 hour: 561 34
Total Flared Volume: 67, 1 31
Run Date: 07 -Oct-02 Sep-30-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
:~:~::::¡IÞi.IIII¡:li'i~I::i¡I::~ßi¡~¡~lf::lll.i¡tj:::j:~::i.j~~::::~::¡:¡¡¡i:i::~:::::::¡:::¡ :¡i:¡::¡::¡:i:::::::::~:::::¡:::¡:~:~:¡:¡:¡:::¡:::::::¡::¡¡:¡¡~::::::::::::::::::¡:::¡~:i:::::::::::::¡¡~::¡~¡¡:~¡~:~¡¡:¡::::::::::::::¡:::::::::::::::¡:::::::::¡::¡¡~ ~:~:~:¡:¡::::::::¡:¡:!:¡:!:¡:!:::::::::::::::::::::::!:::::::::::::::::::::::¡:::::::::::::::!::::::::i:j:¡:!:::!:::::::::::!:::::~::¡ ::::~:~:~:~:~:~:~::::¡::~¡i¡::i::¡:!:¡::::::::::::::~¡~¡¡:¡::¡::::::::::::::::¡:~¡~¡~:i¡::::::::::::::::¡::: :¡:¡:~:~::::::¡:!:¡::i¡i!:¡:!:::!:¡:i:::::::::::::¡~:~:~:::::::::::::::::¡::::::::::!:¡:¡:::i:::i:::::::::
. .. .
Total: 1 0945
:¡:~:~:~~IÎilili¡:li~IJ.:¡&~il.l~~~IÎI~¡¡~¡¡!:B~¡:~:~:~¡¡ ::¡¡:¡:¡:~:¡~¡:¡:¡!¡¡:¡¡:::¡:::¡:¡:¡:¡:¡:¡:¡::¡¡~::¡:I:1: ¡!¡::::¡:¡::::~¡~:~:~:~:¡:¡:¡¡¡:¡:::¡::¡~:¡:~:~:~:~¡~:~:~:~:~::¡:¡~:¡¡~:~:~:¡:~:¡:~:~:~:¡:::::I:I:¡:¡:¡:¡:¡:¡:::¡¡::¡¡::::¡:~:¡:!~:~:~ ~¡:¡¡:::¡:::¡:¡:¡~I:I:I:I:I:I:::I¡ljl:¡:¡:¡:~:~:~:¡:¡:¡:¡ili:¡¡¡:::¡¡:¡:¡:~:~:~:~:¡:¡:¡:¡¡:!iilil:¡:¡:¡:¡:¡: :~¡~:¡:i:¡:¡:¡¡¡i¡:¡:¡:¡:I¡¡i¡¡:i::li::I:¡:¡:¡:¡:¡:::i¡i:i:::::~:¡:¡:¡:¡::¡¡i¡:::¡:::¡¡¡:¡¡¡i¡¡¡::j¡i¡:¡i¡
HPB SID due to LL 4th stage suction.
LP compressor SID when wells were Shut in wells to mitigate flaring.
9/1/02 4:02 PM 9/1/02 5:06 PM 1 78 shut in to mitigate flaring. Restarted equipment. Upset N1 .FLARE.EVENT.LP
HPB SID due to LL 4th stage suction.
LP compressor SID when wells were Shut in wells to mitigate flaring.
9/1/02 5:1 6 PM 9/1/02 1 1 :34 PM 1 1 1 3 shut in to mitigate flaring. Restarted equipment. Upset N1 . FLARE. EVENT. LP
9/2/02 1 :56 AM 9/2/02 3:38 AM 548 PCV -1 01 0 Not seated. Reseat PSV. Opacity N1 .FLARE.EVENT.HP1
9/2/02 6:52 AM 9/2/02 8:28 AM 222 LP SID. SII Wells. Equipment Outage I Opa N1 .FLARE.EVENT.LP
9/2/02 6:52 AM 9/2/02 12:36 PM 1 723 LP Down, Equipment Outage N1 .FLAREEVENT.HP1
9/2/02 8:30 AM 9/2/02 12:24 PM 51 6 LP Down. Equipment Outage N1 .FLARE.EVENT.LP
9/2/02 12:35 PM 9/2/02 2:28 PM 270 LP Down. Equipment Outage N1 .FLARE.EVENT.LP
9/2/02 12:38 PM 9/2/02 2:40 PM 1 032 LP Compressor. Equipment Outage N1 .FLARE.EVENT.HP1
9/2/02 3:09 PM 9/2/02 4:37 PM 1 69 Compressors Shutdown. Opacity N1 . FLARE EVENT. H P1
9/2/02 7:1 0 PM 9/2/02 8:42 PM 291 LP Compressor Down. Restart Plant. Equipment Outage N1 .FLARE.EVENT.LP
9/2/02 7:30 PM 9/2/02 8:41 PM 144 LP Down. Equipment Outage N1 .FLAREEVENT.HP1
9/2/02 8:48 PM 9/2/02 1 1 :24 PM 442 LP Down. Equipment Outage N1 .FLARE.EVENT.HP1
9/2/02 9:14 PM 9/2/02 1 0:44 PM 253 LP Down. Equipment Outage N1 .FLARE.EVENT.LP
9/3/02 5:40 AM 9/4/02 1 0:35 AM 8625 Plant OSD. Equipment Outage N1 .FLARE.EVENT.HP1
9/3/02 6:29 AM 9/3/02 3:03 PM 976 LP Compressor Down. Equipment Outage N1 .FLAREEVENT.LP
9/3/02 6:1 5 PM 9/4/02 2:06 AM 1 397 LP Compressor SID. SII Wells. UpsetlOpacity N1 .FLARE.EVENT.LP
9/4/02 2:55 AM 9/4/02 4:1 1 AM 1 7 PCV Off seat. Opacity N1 .FLARE.EVENT.LP
9/4/02 1 1 :52 AM 9/5/02 8:09 AM 779 Leaking SDV. Upset N1 .FLARE.EVENT.HP1
9/4/02 8:29 PM 9/4/02 1 0:03 PM 15 PCV Not seated. Opacity N1 .FLARE.EVENT.LP
Page 1 of 4
Gas Flaring Incident Report
BP Northstar
Run Date: 07-0ct-02 Sep-30-2002
MCF
Start DatelTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
9/4/02 10:21 PM 9/5/02 1: 38 AM 29 PCV Not Seated. Opacity N1.FLARE.EVENT.LP
9/5/02 2: 13 AM 9/5/02 3:23 AM 17 Unknown. Opacity N1.FLAREEVENT.LP
9/5/02 4: 15 PM 9/5/02 10: 11 PM 105 Unknown. Opacity N1.FLARE.EVENT.LP
9/6/02 12:50 AM 9/6/02 3:43 AM 46 Unknown. Opacity N1.FLARE.EVENT.LP
9/6/02 6:41 AM 9/6/02 8:59 AM 43 Unknown. Opacity N1.FLARE.EVENT.LP
9/6/02 10: 10 PM 9/6/02 11 :48 PM 18 Unknown. Unknown. Opacity N1.FLAREEVENT.LP
Shut in NS-08 & 13 to mitigate
9/8/02 3:03 AM 9/8/02 10:06 AM 2237 Lost LP compressor flaring Equipment Outage N1.FLARE.EVENT.LP
Shut in NS-08 & 13 to mitigate
9/8/02 3:03 AM 9/8/02 10:20 AM 1469 Lost LP compressor flaring Equipment Outage N1.FLARE.EVENT.HP1
Lost LP compressor due to bad I/O All wells shut in to mitigate
card. BESD of facility due to cycling flaring. Repair and restart
9/10/02 7:50 AM 9/10/02 9:31 AM 634 PLC on LP. equipment. Equipment Outage N1.FLAREEVENT.LP
Lost LP compressor due to bad I/O All wells shut in to mitigate
card. BESD of facility due to cycling flaring. Repair and restart
9/10102 7:50 AM 9/10/02 9: 10 AM 458 PLC on LP. equipment. Equipment Outage N1.FLARE.EVENT.HP1
Lost LP compressor due to bad I/O All wells shut in to mitigate
card. BESD of facility due to cycling flaring. Repair and restart
9/10/02 9: 11 AM 9/10/02 2: 13 PM 1234 PLC on LP. equipment. Equipment Outage N1.FLARE.EVENT.HP1
Lost LP compressor due to bad 1/0 All wells shut in to mitigate
card. BESD of facility due to cycling flaring. Repair and restart
9/10102 10:03 AM 9/10102 1: 17 PM 458 PLC on LP. equipment. Equipment Outage N1.FLARE.EVENT.LP
Lost LP compressor due to bad I/O All wells shut in to mitigate
card. BESD of facility due to cycling flaring. Repair and restart
9/10102 7:32 PM 9/11/02 5:35 PM 2093 PLC on LP. equipment. Equipment Outage N 1. FLARE. EVENT. LP
Lost LP compressor due to bad I/O All wells shut in to mitigate
card. BESD of facility due to cycling flaring. Repair and restart
9/10/02 7:32 PM 9/1 0102 10:50 PM 662 PLC on LP. equipment. Equipment Outage N1.FLAREEVENT.HP1
Lost LP compressor due to bad I/O All wells shut in to mitigate
card. BESD of facility due to cycling flaring. Repair and restart
9/10102 10:52 PM 9/11/02 5:43 PM 1299 PLC on LP. equipment. Equipment Outage N1.FLARE.EVENT.HP1
Reduced rates while LP is
9/13/024:47 PM 9/13/026:11 PM 56 LP compressor down for seal repair down Equipment Outage N1.FLARE.EVENT.LP
9/13/02 10:35 PM 9/14/02 2:27 AM 269 LP compressor down for seal repair Reduced rates while LP is down Equipment Outage N1.FLARE.EVENT.LP
9/14/02 1 :20 AM 9/14/02 2:24 AM 2 LP compressor recycle valve failure Trouble shooting valve Equipment Outage N1.FLARE.EVENT.HP1
Page 2 of 4
Gas Flaring Incident Report
BP Northstar
Run Date: 07-0ct-02 Sep-30-2002
MCF
Start DatefTIme End DatefTIme Volume Incident/Cause Description Remediation Taken Event Type Event Name
9/14/022:47 AM 9/14/02 4:38 PM 1976 LP compressor recycle valve failure Trouble shooting valve Equipment Outage N1.FLARE.EVENT.LP
9/17102 2:05 PM 9/17102 6:12 PM 6923 HPB shut down Trouble shooting problem Equipment Outage N1.FLARE.EVENT.HP1
LP compressor shut down because of Repaired frozen transmitters
9/18/02 2:48 PM 9/18/02 4:39 PM 772 frozen level transmitter and restarted Equipment Outage N1.FLARE.EVENT.LP
LP compressor shut down because of Repaired frozen transmitters
9/18/02 2:48 PM 9/18/02 5:03 PM 662 frozen level transmitter and restarted Equipment Outage N1.FLARE.EVENT.HP1
9/19/02 11:45 PM 9/20/02 2:33 AM 1193 HP-B shut down Trouble shooting problem Equipment Outage N1.FLARE.EVENT.HP1
9/20102 1:05 AM 9/20102 2:35 AM 140 LP compressor down Restart LP compressor Equipment Outage N1.FLARE.EVENT.LP
9/20102 2:44 AM 9/20/02 9:22 AM 612 HP compressor outage Restart HP compressor Equipment Outage N1.FLARE.EVENT.HP1
9/20102 2:45 AM 9/20102 9:09 AM 1160 LP compressor down Restart LP compressor Equipment Outage N1.FLARE.EVENT.LP
9/20102 11 :55 AM 9/20/02 1:36 PM 434 HP compressor outage Restart HP compressor Equipment Outage N1.FLARE.EVENT.HP1
9/20102 12:00 PM 9/20102 1 :13 PM 407 LP compressor down Restart LP compressor Equipment Outage N1.FLARE.EVENT.LP
9/20/02 6:41 PM 9/21/02 1 :44 AM 3844 HP compressor outage Restart HP compressor Equipment Outage N1.FLARE.EVENT.HP1
9/20102 7:13 PM 9/21/02 1 :27 AM 699 LP compressor down Restart LP compressor Equipment Outage N1.FLARE.EVENT.LP
9/22/02 6:24 PM 9/23/02 2:02 AM 549 HP compressor outage Restart HP compressor Equipment Outage N1.FLARE.EVENT.HP1
9/22/02 7:11 PM 9/23/02 12:50 AM 916 LP compressor down Restart LP compressor Equipment Outage N1. FLARE. EVENT.LP
9/23/02 8:03 AM 10/1/02 9:40 AM 1469 BDV leaking on HPA Waiting on HPB repair Equipment Outage N1.FLARE.EVENT.HP1
Restarted after trouble
9/25/02 9:21 PM 9/25/02 11 :35 PM 353 HP-a down on 4th stage LL suction shooting switch Equipment Outage N1.FLARE.EVENT.LP
9/14/02 3:31 AM 9/14/02 8:09 PM 1124 unknown Upset N1.FLARE.EVENT.HP1
9/14/02 5:04 PM 9/14/02 7:53 PM 634 unknown Upset N1.FLARE.EVENT.LP
.-
Total: 5~ 5'370,", .... I.tR. ? j 17 I II...
!:~:¡¡:¡:i~illij!:ii.j¡~I!i¡~I:!~li~¡!ii¡:iil~j~¡~i~¡~~:¡:¡6.ii~!¡II:~¡_!¡I~~II~i~:!Id.Ö¡!I~i:::::::!¡!¡!~!¡!~~¡~:~¡~:~¡~:¡:::¡:¡:¡!:!:¡:!:¡:!:!:::::::!:::!:!:!:!:¡:!:!:!:!: '1:~:¡!¡:¡:¡i:i¡!¡!¡:~¡¡¡:¡¡::~¡::!¡!:!¡i~i¡i~ii:¡!~!~¡¡:::¡¡i!¡¡:!¡!:~¡~¡~¡~i~i'1~i~:¡i:~:i~::!:::¡:!:¡:!i¡i~:i:::¡:¡:!:¡:!:::!::¡!::~ ~i~i~i~i~¡~:~:~:~¡~:!¡!:!¡:¡:¡¡:¡¡~:!¡:::¡:¡¡!::~:~i~i~i!¡¡:¡¡:::¡:¡:¡:¡:!:::!~:~!~i~i~i~i~i~i~i~i~:!¡~¡!i~i ..,.,................................................
j¡j¡¡¡j¡jij¡j!j!j!ji¡ili¡ili¡iji¡¡¡¡j¡¡1¡¡j¡jiji¡iiij!j!¡ij¡ji¡!¡i~i¡!1!!¡¡i!¡¡!¡¡¡!¡¡¡¡¡¡¡j!1!i¡!¡!!i¡!¡i
Total: 52
High Gas alarm in HPU Building. Safe in facility and restart
9/1/2002 11:56 9/1/2002 12:10 23 BESD equipment Equipment Outage N1.FLARE.EVENT.HP1
9/1/2002 15:31 9/1/2002 15:57 25 Purge Compressor. Start HPB Compressor. Opacity N1.FLARE.EVENT.LP
9/3/2002 0:17 9/3/2002 0:22 4 Unknown. Unknown Plant Integrity N1.FLARE.EVENT.LP
Bringing rate up for LP compressor
9/14/2002 0:24 9/14/2002 0:27 0 start after seal repair Plant Integrity N1.FLARE.EVENT.HP1
Page 3 of 4
·
Gas Flaring Incident Report
BP Northstar
Run Date: 07-0ct-02 Sep-30-2002
MCF
Start DatefTime End DatefTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
:::iiiii!ljiill!:lliii~:¡:lllIil~:::~:i¡¡6i.1~¡¡¡I¡¡III~~ijili::i.I~::·lliii¡iii¡i:i¡ii:¡iii¡iii¡i!i!i!i!iii¡i!i¡ii:¡i::ii:¡¡i¡i¡¡!¡¡¡~:\:~:¡:\:¡:::¡:~:!:::::¡:¡:¡:!i~:!:¡:!:¡:!:::!:ii¡i!iiiii¡iii::::::::¡¡:¡¡¡¡i¡:!¡ii:i¡iii ¡¡i¡¡¡ii¡¡i!¡::::i:::!:!¡¡:::¡i!!!:::::¡:!::¡!¡!i¡iii¡ii:¡iii¡:ii¡iii!ii!¡iii:i:i¡¡ii¡!ii¡i¡¡¡¡¡¡¡i¡i¡i:¡¡:!¡¡¡!¡¡¡¡¡¡:::¡:(,¡:(¡¡¡¡¡¡i i!:::~:\:¡:::::¡::i!¡¡¡¡¡:¡¡i:¡¡:¡i¡iii¡iii¡ii¡!¡:::¡!¡¡¡!¡!¡¡¡!¡!~::::(:(:¡¡¡¡¡¡¡¡¡¡¡¡¡i¡!¡i:¡!:!:!¡!¡!:¡¡! \:::¡i!:!:!:!~!:!:!:::¡:¡:(:¡:¡:!:::!:(:!:¡:¡:!:¡:i:¡::~!:¡:¡:¡:!:¡:¡:::¡:¡:¡:!¡¡:¡:¡:::¡:¡:¡:i:¡:::~:¡:¡:
Total: 2426
9/1 12002 1 4:40 9/1 /02 1 1 :48 PM 2426 Compressors not running. start compressors Equipment Outage / Opa N 1 FLARE. EVENT. HP1
Page 4 of 4
..
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Operator
BP Exploration (Alaska) Inc.
Field(s)
Northstar
Disposition
Volume MCF'
1. Sold 0
2. Reinjected 6,940,283
3. Flared or vented less than 1 hour 2,618
4. Flared or vented ¡¡reater than 1 hour ~iOil(q
(Supplemental report required-oSee 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,759
6. Used for lease operations Assist 0
Fuel (at island) 332,493
Fuel (Caribou Crossin¡¡) 34,055
Fuel (PS#1 htr\ 7956
7. Other 0
TOTAL items 1-7 7,330,885
8. NGL ¡¡as equivalent produced 0
9. Purchased ¡¡as 1,741,882
10. Transferred from:
11. Transferred to:
I hereby cert" that the foregoing is true and correct to the best of my knowledge.
Signature (¿ Q. A J.~~~ 1A Title VVLGfl í /'<)< Date lLll :](oz
Form 1 0-422
Rev. 4/95
Month/Year of Disposition
Oct-02
'Indicate contribution of each pool to total.
Pool Name voae
Percent
1. Safety
2. Lease
MCF
3. Conserv. Purposes
MCF
[~( ?\\rJ--
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
..
Gas Flaring Incident Report
BP Northstar
Oct-2002
Volume flared less than 1 hour: 2618
Volume flared greater than 1 hour: 10721
Run Date:
07-Nov-02
Total Flared Volume: 13,339
Oct-31-2002
Start DatelTime
End DatelTime
MCF
Volume
............................................................"",.............................. .
:::::~::ø~~~~:~:ii6Ii::iji.ð.~i:¡¡.¡¡tl~:~:ijf::~:::~:::!:~~æ.:i~i~:~l¡::iiji~:¡::::¡::¡:::¡:::::::¡¡:~¡~¡~:
Total: 2568
" ......... .......... ......... """... ;.:::.:;:::::::::::::::::::::;:;:;:;:::::::::::::::::::::;:::::::::::::::::':;:", ,'.:::::::::::::::::::::::;:::;:::::::::::::::::::;:::;:::::.:::::::::::::::::;:;:;:::;:;:::::::::::.:::;:;:::;:':::':::", :.:;:::::::::::::::::.:-
:::~:¡:~16:~j¡~¡li:¡I~il¡:~~?~fiæif:j6.jij:~~':~::6¡;~:~::::~:~:~:~:~:~:~:::::::~:~:::¡::::¡:i:¡:¡:¡¡::¡:::::::~::¡:~:~:~:~:¡:~:::::¡:::~:~:~:~:~l~~:::j:~::::~:~:¡:::¡:::¡j::¡:::::::::::i\:m¡i¡:¡::i¡::~¡::::::::¡:::~:~:~:~:~:¡:::::¡j¡:¡}:::¡:~:~:~:¡:::~:::~~::~:~:~:~:~:¡:¡
10/2/02 4:57 AM 1 0/2/02 7:22 AM 5 Leaking BDV on HP-B Equipment Outage
HPA SID on low 4th stage pressure -> Repaired pressure switch and
10/2/02 12:49 PM 10/6/02 5:24 AM 156 Bogus. re-started machine. Equipment Outage N1.FLARE.EVENT.HP1
A solar tripped off line causing power Came back on line with
10/6/02 5:39 AM 1 0/6/02 1 :25 PM 65 failure minimum rates Equipment Outage N1.FLARE.EVENT.HP1
Came back on line with
A solar tripped off line causing power minimum rates while trouble
10/6/02 1 :42 PM 10/6/02 6:42 PM 2993 failure shooting A Solar Equipment Outage N1.FLARE.EVENT.HP1
Came back on line with
A solar tripped off line causing power minimum rates while trouble
10/6/02 2:00 PM 10/6/02 3:50 PM 270 failure shooting A Solar Equipment Outage N1.FLARE.EVENT.LP
Came back on line with
A solar tripped off line causing power minimum rates while trouble
1 0/6/02 4: 15 PM 10/6/02 6:43 PM 339 failure shooting A Solar Equipment Outage N1.FLARE.EVENT.LP
Came back on line with
A solar tripped off line causing power minimum rates while trouble
10/6/02 6:45 PM 10/7/024:46 AM 1957 failure shooting A Solar Equipment Outage N1.FLARE.EVENT.HP1
Came back on line with
A solar tripped off line causing power minimum rates while trouble
10/6/02 7:05 PM 10/7/0212:58 AM 748 failure shooting A Solar Equipment Outage N1.FLARE.EVENT.LP
Solar power generation failure SID
10/7/02 1 :27 AM 10/7/024:23 AM 890 facility Restart facility Equipment Outage N1.FLARE.EVENT.LP
Solar power generation failure SID
10/7/02 7:56 AM 10/7/029:27 AM 3 facility Restart facility Equipment Outage N1.FLARE.EVENT.HP1
Page 1 of 2
..
..
Gas Flaring Incident Report
BP Northstar
Run Date:
07-Nov-02
Oct-31-2002
MCF
Start Date/Time End Date/Time Volume Incident/Cause Description Remediation Taken Event Type Event Name
Solar power generation failure SID
10/8/02 3:30 AM 10/8/02 4:57 AM 742 facility Restart facility Equipment Outage N1.FLARE.EVENT.HP1
Solar power generation failure SID
10/8/02 2:30 PM 10/8/02 5:52 PM 864 facility Restart facility Equipment Outage N1.FLARE.EVENT.HP1
Solar power generation failure SID
10/8/02 6:23 PM 10/9/02 3: 17 AM 22 facility Restart facility Equipment Outage N1.FLARE.EVENT.HP1
10/9/025:37 AM 10/10102 7:36 PM 72 HPA SDV leaking by. Work order written for repair. Plant Integrity N1.FLARE.EVENT.HP1
10/10102 7:50 PM 1 0/1 0102 11 :52 PM 9 HPA SDV leaking by. Work order written for repair. Plant Integrity N1.FLARE.EVENT.HP1
10/11/02 12:38 AM 10/12/02 1 :33 AM 44 HPA SDV leaking by. Work order written for repair. Plant Integrity N1.FLARE.EVENT.HP1
LP compressor shut down due to plant
10/12/02 1 :32 AM 10/12/023:17 AM 268 up set. Restarted compressor. Equipment Outage N1.FLARE.EVENT.LP
LP compressor shut down due to plant
10/12/02 2:07 AM 10/12/02 12: 17 PM 217 up set. Restarted compressor. Equipment Outage N1.FLARE.EVENT.HP1
10/12/02 1 :09 PM 10/12/027:19 PM 11 HPA SDV leaking by. Work order written for repair. Plant Integrity N1.FLARE.EVENT.HP1
10/31/029:00 AM 11/3/026:55 PM 648 SDV Leakage. Equipment Outage N1.FLARE.EVENT.HP1
10/31/029:19 AM 10/31/0212:48 PM 396 LP Compressor own. Equipment Outage N1.FLARE.EVENT.LP
Total: 10721
::::~:::jit~ili:~il6.î~~:¡ïl~:~ñi¡~:if::i~ijl:~~i¡::j:::¡ii.Î~¡:I~i:::lij::~IJ.ii.ijijri¡:~I~~:II:¡:~:¡:~:::¡¡~::¡::::¡¡~:~:~:~:¡:¡::¡::~¡::::~:¡:~:~:~¡~:¡:¡:::~::¡:::~::¡:¡:¡~:
:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.;.:.:.:.:.:.:.:.:.:.:.;.;.;.;.;.:.:.:.:.;.;.:.:.:.:.:.:.:.:.:.:.:.;.
¡¡¡¡¡¡¡j¡¡¡j¡¡¡¡¡j¡¡¡¡¡¡¡¡¡¡¡i¡¡¡¡¡¡¡j¡¡~IjiIi¡¡¡¡¡¡¡¡lii¡¡¡¡¡¡¡¡¡itijii¡iii¡i¡i¡!!i!iii¡i¡¡¡¡¡¡¡¡i¡¡¡
10/28/2002 8:46
10/28/2002 8:57
10/28/2002 9: 12
10/28/2002 9:24
10/28/2002 9:39
10/28/2002 10:06
Total:
10/28/2002 8:51
10/28/20029:03
10/28/2002 9: 17
10/28/2002 9:30
10/28/2002 9:45
1 0/28/2002 10: 11
50
9
8
8
8
8
7
A Solar Start Gas
A Solar Start Gas
A Solar Start Gas
A Solar Start Gas
A Solar Start Gas
A Solar Start Gas
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
Total: 0
Page 2 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Facility
Northstar
Field(s)
Northstar
Disposition
Volume MCF*
1. Sold 0
2. Reinjected 6,694,217
3. Flared or vented less than 1 hour 1,015
4. Flared or vented ¡¡reater than 1 hour ~ }(.,543
(Supplemental report requlred--See 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,670
6. Used for lease operations Assist 0
Fuel (at island) 294,048
Fuel (Caribou Crossin¡¡) 30,150
Fuel IPS#1 hÚí 8122
7. Other 0
TOTAL items 1-7 7,046,766
8. NGL ¡¡as equivalent produced 0
9. Purchased ¡¡as 1,629,692
PURCHASED GAS USED FOR FUEL PILOT PURGE AND INJECTION
10. Transferred from:
11. Transferred to:
I hereby ce~ t~t thtgOing is true and correct to the best of my knowledge.
Signature' ¿ - U . .A <'¡fl\L Title I\A<. (¿. íf'\}( Date I z...((.~ 107..
Form 1 0-422
Rev. 4/95
MonthNear of Disposition
Nov-02
'Indicate contribution of each pool to total.
Pool Name Il,;Oae
Percent
1. Safety
/b¡54?> MCF 0&P-
2. Lease
MCF
3. Conserv. Purposes
MCF
~~hl'£}~1
Commi oner
I <Yj¡F1'! 0 #--
Date
Note: All volumes must be corrected to
pressure of 14.65 psia and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
. 25.235.
Gas Flaring Incident Report
BP Northstar
Nov-2002
Volume flared less than 1 hour: 1015
Volume flared greater than 1 hour: 16544
Total Flared Volume: 17,559
Run Date: 02-Dec-02 Nov-30-2002
MCF
Start DatefTime End DatefTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
¡¡:::iiillf:_I::j.~::.:¡.I~I~i:¡I¡Jiii:¡~::¡II:::::::::!!:¡¡::::::::::::::::::¡:: :::::::::::::::;:¡::¡:~:~¡~:~:~:~¡~:¡¡~:~¡~:~:~:~:~:~:::::¡:¡::::::::::::::::::i:::i::::::::::::::::~:::::¡::::::::::::::::::i:::::i:::::::!!::!:!i!i:iii:~:~:¡ :ii::~¡:¡~ii:i:~:~:i¡~:i¡::~:::::::::::::::::::::;:::!:!i!i!i!::i!i:i!:::!:i:i:::::::::::!:!i!:::!:::!:::!:::!:::!!!:!:!:!:!:!:!: !i!i!i!::i!:::!:i:i:::::::i::::::::~¡~:i::!:::!:!:!:!:!:i:!::::::::::;:::::¡::~i~i~:i!:::!::::::::::i:¡ 1:1:1:::!:::!::::::iliiilili!i!:li::I:!:!:::!:!:!:!:!:!:!::::ii::i:~:~:;::il:::!:::!:::!:::::::liiili
Total: 1015
¡;!iiiill¡IIi.:!!I_:!:::i¡II¡¡_~:iiì!:!la~!!:!:!::¡:~: i~:~ii¡¡¡i!iii¡i¡:::::::il!:!:!:!:!¡:::¡¡:::¡:!:¡:!:¡¡ !¡¡¡::!::!!:¡:¡::~¡~:~¡~:~:¡:~:~i~¡~¡~:~¡~¡~:~¡~:~:~i~¡~:~¡~:~:¡¡¡:::¡:::I¡I¡:¡:¡:i:¡::::¡::::¡~¡:¡:i~¡::~¡~::¡::¡::::¡~::¡:¡:¡::¡:¡::::I:!:!:!:ii!i¡i!ili¡ii~!¡ ¡¡i~¡ii¡¡iiiiili¡~:~:~i~¡~i~¡~:~¡~I~:~¡¡i::~i:¡:¡:::;!:!:!i::ii!¡I:¡:ii:i;!:i:;!:::!:!:i:!:!:!:;!:;!:::::!:!I!;:!:;;!:i::: ii!:!~;;;!:¡:::::::::::::¡:¡::~¡~i¡¡¡li::!ii:!:::i:!:!:!:!:::::::::i:::¡~:~¡~¡~¡¡¡i¡i!:!:::::::¡ii~ ¡¡¡¡¡¡!¡li::!:!:::¡:¡~::¡¡¡¡I¡i¡lii¡¡~¡¡¡:¡:¡:¡:!¡:i!:!i!:!:;¡:;;¡¡::::::i~¡¡¡i¡:¡:::!:::!:ii;;¡:
1 1/5/02 12:22 PM 1 1/6102 12:25 AM 807 tests Upset/Opacity N1.FLARE.EVENT.HP1
production resumed following TAPS
1 1/6/02 9:14 AM 1 1/6102 3:57 PM 964 shutdown Equipment Outage N1.FLARE.EVENT.HP1
production resumed following TAPS
1 1/6/02 9:21 AM 1 1/6102 2:41 PM 705 shutdown Equipment Outage N1 .FLARE.EVENT.LP
1 1/1 1/02 10:04 AM 1 1/1 1/02 12:16 PM 442 production restart LP compressor start Equipment Outage N1.FLARE.EVENT.LP
1 1/12/02 12:40 PM 1 1/12/02 5:08 PM 185 HPB Depressure for Startup Equipment Outage N1 .FLARE.EVENT.HP1
1 1/12/02 6:38 PM 1 1/12/02 9:28 PM 57 HPB Depressure for Startup Equipment Outage N1.FLARE.EVENT.HP1
1 1/12/02 9:58 PM 1 1/13/02 12:20 AM 278 HP B depressure after start attempt Equipment Outage N1 .FLARE.EVENT.HP1
1 1/13/02 12:31 AM 1 1/13/02 7:23 AM 1 0 HP A BDV leak Equipment Outage N1.FLARE.EVENT.HP1
1 1/13/02 4:44 PM 1 1/13/02 6:08 PM 165 HPB Depressure for Startup Equipment Outage N1.FLARE.EVENT.HP1
1 1/13/02 8:40 PM 1 1/14/02 7:38 AM 22 hp B depressure Equipment Outa¡¡e N1 .FLARE.EVENT.HP1
1 1/14/02 1 1 :00 AM 1 1/14/02 3:09 PM 8 hp A BDV leak Equipment Outage N1 .FLARE.EVENT.HP1
HP A BDV leak transmitter thawed at
1 1/14/02 3:42 PM 1 1/15/02 6:22 AM 42 622 am Equipment Outage N1.FLARE.EVENT.HP1
1 1/15/02 7:23 AM 1 1/1 9/02 2:35 PM 227 hp A BDV leak Equipment Outage N1 .FLARE.EVENT.HP1
1 1/19/02 2:48 PM 1 1/30102 1 1:58 PM 5356 hp A BDV leak Equipment Outage N1.FLARE.EVENT.HP1
Immediately 8/1 N8-13 & 14 to
mitigate flaring. Troubleshot and
Lp compressor down due to bad seal repaired faulty check valve and
1 1/22/02 7:47 AM 1 1/22/02 8:09 PM 5179 gas check valve restarted Lp compressor Equipment Outage N1 .FLARE.EVENT.LP
Page 1 of 2
- " .
Gas Flaring Incident Report
BP Northstar
Run Date: 02-Dec-02 Nov-30-2002
MCF
Start DateJTime End DatelTime Volume Incident/Cause Description Remediation Taken Event Type Event Name
S/I wells NS-08, 13, 14 & 15 and
reduced choke on NS-09 to
LP Compressor shut down due to a reduce flaring until repairs to the
faulty check valve in the N2 buffer gas LP compressor were finished.
1 1/23/02 2:55 PM 1 1/23/02 5:00 PM 488 to the 5th stage seal. LEN Equipment Outaae N1 .FLARE.EVENT.LP
SII wells NS-08, 13, 14 & 15 and
reduced choke on NS-09 to
LP Compressor shut down due to a reduce flaring until repairs to the
faulty check valve in the N2 buffer gas LP compressor were finished.
1 1/23/02 5:1 0 PM 1 1/23/02 1 0:1 6 PM 1 061 to the 5th stage seal. LEN Equipment Outage N1 .FLARE.EVENT.LP
1 1/24/02 5:15 AM 1 1/24/02 8:32 AM 37 Source unknown Investigating possible sources Equipment Outage N1 .FLARE.EVENT.LP
1 1/25/02 7:54 AM 1 1/25/02 12:03 PM 65 Source unknown Investigating possible sources Equipment Outage N1 .FLARE.EVENT.LP
1 1/25/02 4:51 PM 1 1/25/02 8:23 PM 58 Source unknown Investigating possible sources Equipment Outage N1 .FLARE.EVENT.LP
1 1/25/02 1 1 :14 PM 1 1/26/02 2:28 AM 49 Calibration error Wrote work order to re calibrate Equipment Outaae N1 .FLARE.EVENT.LP
1 1/26/02 8:39 AM 1 1/26/02 2:24 PM 52 Calibration error e calibrate Wrote work order to re calibrate Equipment Outage N1 .FLARE.EVENT.LP
Total: .~ '''z,~-'
:¡::ii::__:¡:I_¡:I~;:j_::I:I~lf¡I::;:¡:I~~¡~il¡¡¡Ii.i¡¡I~Êi.il~:¡~ij¡~::II::::¡~:~i:::¡:¡:i:¡¡::i::j:¡i¡i!:¡¡:¡¡:¡;:::¡¡¡:¡:¡:¡::::::¡:¡¡¡:¡:¡~¡:¡i¡: :i:::i:i¡:¡:¡¡:i::::::::¡:i¡:¡¡¡:¡:::j:::::::::!:¡¡:::¡¡¡:::¡:::::¡:¡:¡¡¡:::::::::::¡¡¡:¡:¡:::¡:::::::::::¡:¡:¡:::¡::::: ¡:¡:¡¡:¡:¡:¡:¡:¡:::::::¡:¡::¡¡:!:::::::!:¡:!:!:¡:¡¡¡¡:::j::i::¡:¡~~¡:¡:¡:::::j:¡:j:¡:¡::::¡::¡: i~:~¡~:~¡:¡¡:::j:¡:j:::¡:::¡:::¡:j¡:j:¡:j:¡:::¡:::j::::¡:j:::i::::::::::¡¡::~¡:¡:::¡:¡:::¡::~::¡:¡:
Total: 0
~:~¡:¡:¡:~III:~¡i_::IIII¡¡:¡~:!~II:lii:¡llIli~_¡¡_:!:¡¡!:!:!:¡:!:::!!!:!:!:!!!:!:!:!:::!!!:!:!:!!!:!:¡:::::¡:¡~¡~!~¡~¡~¡~¡~:~¡~:~¡~¡~¡~:~!!~!¡::::¡~¡:::¡:¡:!:¡:!!::¡¡¡:¡:¡:¡:¡~¡~::¡:¡:¡:::¡:¡~¡~:~¡~¡~ :¡!~¡~!~¡~¡~:~¡~¡~!~:¡:~:~!::~¡:¡:¡:¡:¡:::::¡!!!!:!:!:!:!:!¡¡:!¡::!:::!:¡:!:!:!:¡:!:!:::!:!:!:!:!:!:!:!::I!:¡:¡:¡:¡~¡~¡:¡:¡:¡::::: ¡:¡:::¡:¡:¡:¡::I¡:!:¡:¡:!:!:!:!:!:!:::!:¡:!:!:!:!:!:!:!:i:::::!:¡:!:¡~!~¡~¡~¡~::¡:¡:i:!:¡:!:¡:!:i:!:i::~ !:¡~¡:¡~!~¡~¡~:~¡~¡~¡:¡:¡:¡:¡:¡~¡:¡:¡:¡:¡:¡:¡:i:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:¡:!:¡:¡:¡:!:!:¡~¡~!:i:!:i:!:¡:!:
Total: 286
1 1/6/2002 1 9:1 9 1 1/12/02 1 0:25 AM 286 HPA blowdown valve leaking Work order written- Equipment Outage N1 .FLARE.EVENT.HP1
Page 2 of 2
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Month/Year of Disposition
Dec-02
I Disposition I Volume MCF' I 'Indicate contribution of each pool to total.
Pool Name IJOde Percent
1. Sold 0
2. Reinjected 7,578,637
3. Flared or vented less than 1 hour 3,053
4. Flared or vented ¡¡reater than 1 hour 28,178 "--'
(Supplemental report requlred··See 20 AAC 25.235)
5. Pilot and Pur¡¡e 2,759
..cu... <....> »>.....,..... ... .·..·.··.·..i>..
6. Used for lease operations Assist 0 .-, '.-.......
............... . i··.·..·..·..·
Fuel (at iSland) 356,525 \>......>\\ ......>....... ....... ........... \\...>............. > .\
Fuel (Caribou Crossin¡¡) 33,961 ..........
Fuel IPS#1 htr\ 8541
1 . Safety 20 J7<6 MCF
7. Other 0 Dj
2. lease MCF
TOTAL items 1-7 8,011,654
3. Conserv. Purposes MCF
8. NGl ¡¡as equivalent produced 0
9. Purchased ¡¡as 2,046,582 (¡t~::~tlduJ:¥r 10/0.:.
PURCHASED GAS USED FOR FUEL PILOT PURGE AND INJECTION
10. Transferred from: Commis i ner Date
11. Transferred to: Note: All volumes must be corrected to
Signature
Title P1t\,6tL ïA:X
Date t/Is/tr;.
Form 10-422
Rev. 4/95
pressure of 14.65 pSla and to a
temperature of 60 degrees F. Report due
by the 20th of the month folowing the
month of disposition. Authority 20 AAC
25.235.
5ß(o!-
Gas Flaring Incident Report
BP Northstar
Volume flared less than 1 hour: 3053
Volume flared greater than 1 hour: 28178
Dec-2002
Total Flared Volume: 31,231
Run Date: 07-Jan-03 Dec-31-2002
_ MCF
Start Date/Time End Date/Time Volume Incident/Cause DescriÞtion Remediation Taken Event TyÞe Event Name
I Total: 2931
12/1/0212:01 AM 12/14/027:16 PM 4059 Bled down Test Separator. None needed Plant Intearity N1.FLARE.EVENT.HP1
LP Compressor SID due to Heat media
814 upset
525 LP comp down due to plant BESD
519 HP-B camp down
10759 HP-B comp down
411 HP-B comp down
5189 HP-B comp down
1710 LP Compressor SID.
58 LP Compressor SID.
715 LP Compressor SID.
2 Bled down Test Separator.
359 HPA Purge.
1720 HPB 8lowdown.
343 Bringing on wells.
994 Bringing on wells.
12/10102 8:29 PM
12/14/024:18 PM
12/161027:34 PM
12/161027:36 PM
12/17102 2:22 AM
12/17/022:23 AM
12/23/02 4:50 AM
12/23/02 4:50 AM
12/23/028:11 AM
12/28/02 8:08 PM
12/29/02 11 :41 AM
12/29/02 11 :37 PM
12/3010212:18 AM
12/30/02 5:57 AM
12/1010210:10 PM
12/14/02 6:59 PM
12/16102 10:54 PM
12/1610210:35 PM
12/17/02 3:32 AM
12/17/023:24 AM
12/23/02 1 :11 PM
12/23/025:55 AM
12/23/02 12:32 PM
12/28/029:29 PM
12/29/0212:57 PM
12/301023:40 AM
12/30/02 2:55 AM
12/301027:31 AM
Total: 28178
-~:
Total:
12/31/200218:05
12/27/200219:58
12/27/2002 20:54
12/28/20025:23
12/31/200217:48
12/27/2002 19:29
12/27/200220:37
12/28/20025:16
Total: 0
.........
....:.:.:
122
41
46
35
o
Bringing on wells
Bled down Test Separator.
Bled down Test Separator.
Bled down test Separator.
Repaired problem & restart LP
Restarted
Restarted.
Restarted.
Restart
Restart
Restart.
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
Eauipment Outage
Equipment Outage
Equipment Outage
Equipment Outage
UpseVOpaci y
UpseVOpaci y
UœeVOpaci y
UpseVOpaci y
UœeVOpaci y
UpseVOpaci
UpseVOpaci y
UpseVOpaci y
UœeVOpaci y
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.LP
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP2
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP2
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.LP
N1. FLARE. EVENT .LP
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE. EVENT.LP
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1
N1.FLARE.EVENT.HP1