Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CGF B / BP Exploration STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2002 FACILITY: PBU CGF B OPERATOR: BP EXPLORATION (ALASKA) INC Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 01/2002 CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 2,902,157 2. Reinjected 12,942,579 3. Flared or vented less than 1 hour. 2,717 - 4. Flared or vented greater than 1 hour 10,212 / (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 30,756 6. Used for lease operations Fuel 3,259,896 Assist 41,615 7. Other Lift Gas, Off Field 0 /' TOTAL items 1 - 7 19,189,932 8. NGL gas equivalent produced 2,902,157 9. Purchased gas 0 10. Transferred from: CCP 20,942,789 11. Transferred to: FS1, FS2, FS3 1 ,752,857 Remarks: I hereby ceV:a t~egOing,~true and correct to the best of my knowledge. Signature: . A II/Y'IA' 'J u Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use J () /,;;L}:l- MCF 3. Conserv. Purposes MCF J! slö-y Date "'L Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT JANUARY, 2002 Page 1 IUnplanned Events less than or equal to 1 hour DATE TIME VOLUME '., 'DESCRIPTION OF INCIDENT & CAUSE 1/23/2002 1000-1040 255 Not required for unplanned events which 1/23/2002 1257-1321 255 are less than or equal to 1 hour 1/24/2002 0330-0430 255 Intermittent 1/28/2002 1615-1640 1,583 ACTION TAKENTc ELIMINATE CAliSE Not required for unplanned events whi are less than or equal to 1 hour TOTAL 2,348 lunplanned Events greater than 1 hour 'DATE "',TIME VOLUMEDESCRIPTlcNOF INCIDENT & CAUSE 1/23/2002 1230-2230 3,550 Intermittent - See Attachments 1/30/2002 0230-0410 6,662 Intermittent - See Attachments TOTAL 10,212 . ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf ,DATE,,' TIME VOLUME " , DESCRIPTION OF INCIDENT & CAUSE 1/15/2002 1037 -1040 19 See attachments 1/25/2002 1040-1120 110 1/25/2002 1600-1700 120 1/25/2002 1845-1930 120 TOTAL 369 ACTION TAKEN TO ELIMINATe CAUSE ' See attachments Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 'DATE TIME ' VOLUIVIEDESCRIPTlcN OF INCIDENT & CAUSE See attachments TOTAL 0 , ,ACTION TAKEN TO ELIMINATE CAUSæ '. ' .",.".", ,-.'",'". ". , , ._,_."."."..." ...'u.'u.". See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour & not exceeding 5,000 MCF Planned Events> 1 hour and exceeding 5,000 MCF Pilot Purge Assist 2,348 10,212 369 o TOTAL FLARED VOLUME REPORT NO: 02-0026 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 15 Jan 2002 SYSTEM TIME OF FLARING Start Stop Duration 10:37 10:40 0 Hrs 3 Mins 1. Flare/Relief Valve First Determination of Cause: J 1. Swapping CCP's tandem 1876 to L TS1/2 Meter #664 Action Taken to Stop Flaring: 1. Swap completed Monday, January 28, 2002 Black Intermittent Smoke o 0 Planned ~ TOTAL VOLUME VOLUME 19 MSCF 19 MSCF Page 1 of 1 REPORT NO: 02-0038 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 23 Jan 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Controlled Blowdow 10:00 10:40 o Hrs 40 Mins 0 0 0 255 MSCF 2. Controlled Blowdow 12:30 22:30 10 Hrs OMins ~ 0 0 3,550 MSCF 3. Controlled Blowdow 12:57 13:21 OHrs 24 Mins 0 0 0 255 MSCF TOTAL VOLUME 4,060 MSCF First Determination of Cause: 1. Booster Compressor 1802 shutdown for engine changeout and power turbine inspection. 2. numerous start attempts failed on Booster Compressor 1857 due to fuel control problems and low ambient/IGV problems 3. Booster Compressor 1801 shutdown for GG starter replacement and other minor maintenance. Action Taken to Stop Flaring: 1. Compressor blowdown complete. ,/ 2. Left unit down-unable to start until ambient temperature warms up. 3. Compressor blowdown complete. Monday, January 28, 2002 Page 1 of 1 REPORT NO: 02-0047 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 25 Jan 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 10:40 11 :20 o Hrs 40 Mins ~ 0 ~ 110 MSCF 2. Flare/Relief Valve 16:00 17:00 1 Hrs OMins ~ 0 ~ 120 MSCF 3. Flare/Relief Valve 18:45 19:30 o Hrs 45 Mins ~ 0 ~ 120 MSCF TOTAL VOLUME 350 MSCF First Determination of Cause: 1. Booster 2 start atttempt - SO on incomplete sequence .J 2. Shut down Booster 2 to repair leaks on GG hydraulics - 3. SO Booster 2 to work on Scheduling valve Action Taken to Stop Flaring: 1. Finally got Booster 2 started - Used valving to prevent complete blowdown J 2. Repaired leaks after SO - Used valving to prevent complete blowdown 3. repaired scheduling valve and restarted machine - Used valving to prevent complete blowdown Monday, January 28, 2002 Page 1 of 1 REPORT NO: 02-0071 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 30 Jan 2002 TIME OF FLARING Black __________SYSIEM _..m__Start.Stop__.__.Duration "m.,.lntermittent~Smoke._~anned_.__V.aLUME_ 1. Flare/Relief Valve 02:30 04:10 1 Hrs 40Mins ~ 0 0 6,662 MSCF TOTAL VOLUME 6,662 MSCF First Determination of Cause: 1. MI#2 compressor train shutdown on high EGT. Flare meter number 660. ./ Action Taken to Stop Flaring: 1. Restarted compressor train within 30 minutes. Had difficulty getting unit to load due to gas composition. Thursday, January 31, 2002 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 02/2002 CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 2,794,487 2. Reinjected 12,075,608 3. Flared or vented less than 1 hour. 1,431 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 27,555 6. Used for lease operations Fuel 3,383,033 Assist 33,401 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 18,315,515 8. NGL gas equivalent produced 2,794,487 9. Purchased gas 0 10. Transferred from: CCP 19,899,206 11. Transferred to: FS1, FS2, FS3 1,583,691 Remarks: I hereby cerJ ~~t ~e fOregOi~ðiS true and correct to the best of my knowledge. Signature: ~ ~ ...A I. Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Page 1 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT FEBRUARY, 2002 lunplanned Events less than or equal to 1 hour . DATE ·T!IVIE.. ..... VQLUME DESCRIPTIQNOFINCIDENT" CAVSE . ACTlONTAKEJIITO ELlMINATECAUSE' 2/1/2002 1330-1410 1,431 Not required for unplanned events which Not required for unplanned events whi( are less than or equal to 1 hour are less than or equal to 1 hour TOTAL 1 ,431 Intermittent - See Attachments Intermittent - See Attachments o See attachments See attachments TOTAL Iplanned Events Less Than or Equal 1 Hour AND Not Exceedin~ 5000 Mcf . . DATE . .. TIME 'VOLUI¥IE . DI;Ii)CRIPTION OF INCIDENT & CAUSE ..ACTlONTAKENTOELIMINATECAUSE· See attachments See attachments TOTAL o Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf . ···DATE· .. ". .... TIME .' .... ..' .'. VOLUME . DESCRIPTION Oi= INCIDENT & CAUSE See attachments TOTAL 0 .... ..ACTIONTAKENTOELIMIJIIATECAUSE .... See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME o o o 62,387 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 03/2002 CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 3,076,343 2. Reinjected 12,785,215 3. Flared or vented less than 1 hour. 430 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 30,222 6. Used for lease operations Fuel 3,706,271 Assist 45,270 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 19,643,751 8. NGL gas equivalent produced 3,076,343 9. Purchased gas 0 10. Transferred from: CCP 21,397,925 11. Transferred to: FS1, FS2, FS3 1,754,174 Remarks: I hereby cer¿ .Cr It foregOin¡/s true and correct to the best of my knowledge. Signature: . . l ^- I. Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT MARCH, 2002 ~Unplanned Events less than or equal to 1 hour DAtE TIME" VOLUME DESCRIPTION C)F INCIDENT 8< CAUSE .,....................... ..................,...,...,.. ",,-- ..,..".,,,,.,,-,,.....................,...,..,,,.,,,.,,.,..........................,...,..". 3/26/2002 0735-0755 430 Not required for unplanned events which are less than or equal to 1 hour Page 1 TOTAL 430 ~Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT 8< CAOSE Intermittent - See Attachments Intermittent - See Attachments o TOTAL ACTION TAKEN TO ELIMINAtE CAUSE Not required for unplanned events whi< are less than or equal to 1 hour ACTION TAKli:N TO ELIMINATE CAUSE See attachments See attachments Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT 8< CAUSE See attachments TOTAL o Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT 8< CAUSE See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 430 o o o TOTAL FLARED VOLUME 75,922 ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTIÓN TAKEN TO ELIMINATE CAUSE' , See attachments Facility CENTRAL GAS FACILITY Disposition 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 04/2002 Fuel Assist Volume MCF" 2,791,133 11,869,938 5,483 ./ 24,833 ../ 29,626 3,294,611 59,438 0 18,075,062 2,791,133 0 19,751,333 1,676,271 ~ Date "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 6. Used for lease operations 7. Other TOTAL items 1 - 7 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: CCP 11. Transferred to: FS1, FS2, FS3 Remarks: Signature: Form 10-422 (Revised 4/95) Lift Gas, Off Field 1. Safety "2LI 5.33 MCF V1'~ , 2. Lease Use MCF 3. Conserv. Purposes MCF b~~ and correct to the best of my knowledge. Title: SUPERVISOR Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT April 2002 Page 1 ¡unPlanned Events less than or equal to 1 hour QATE' TIME V!1!i2Q!VII;. ·[)I;~I\1iRIP'fI!1! I ºf¡I I ç:I )"ç"fr"'/C,4.Q.SE 4/8/2002 0150-0250 879 Not required for unplanned events which 4/13/2002 1206-1300 1,876 are less than or equal to 1 hour 4/18/2002 0825-0852 430 4/19/2002 1233-1245 20 4/25/2002 1705-1730 276 4/30/2002 1549-1552 225 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events whic are less than or equal to 1 hour TOTAL 3,706 ¡unPlanned Events greater than 1 hour DATE . TIME' VOLUME DESCRIPTION OF INCIDENT & CAUSE 4/19/2002 0648-1342 687 See attachments 4/19/2002 0650-1010 17,091 4/26/2002 1300-1503 250 4/27/2002 0200-0440 3,655 ACTION TAKEN TO ELIMINATE CAUSE. . See attachments TOTAL 21,683 Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct . DATE . TIME .. VOLUME DESCRIPTION OF INCIDENT & CAUSE 4/2/2002 0655-0704 255 See attachments 4/2/2002 1542-1554 255 4/25/2002 1710-1745 387 4/28/2002 2140-2210 430 4/30/2002 Intermittent 450 ACTION TAKEN TO ELIMINATE CAUSE See attachments TOTAL 1,777 ¡Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION .OF.INCIDENT & CAUSE 4/21/2002 1149-1432 2,720 See attachments 4/29/2002 1620-1920 430 ACTION TAKEN TO ELIMINATE CAUSE. See attachments TOTAL 3,150 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 21,683 1,777 3,150 TOTAL FLARED VOLUME 119,380 OS/23/2002 10:20 FAX 90i 564 4094 bp TAX DEPT. ALASKA @002 REPORT NO: 02-0274 i BPXA FLARE REPORT : PRUDHOE BAY FACILITY: CGF I i I I DATE: 119 Apr 2002 I SYSTEM 1. Controlled Blowdow 2. Flare/Relief Valve 3. Bum Pit ! TIME OF FLARING Btack i; \ Duration Interm Ittent Smoke Planned VOLUME Start 'Stop . I 06:48 1~:42 6Hrs 54 Mins ~ 0 0 687 MSCF I 0 17.091 MSCF 06:50 10:10 3Hrs 20 Mins 0 0 : (12:33 12:45 OHrs 12Mins 0 ~. 0 20 MSCf ¡ I TOTAL VOLUME 17,798 MSGF I First Determination of Cause: I ,. T/C-1855 compressor and assøciated piping blowdowns. Mtr. #618 0648 to 0709 am, full pressure iblowdown-387 Mscf 1149 to 1217 pm, partial depressLlre (from 1500 psi to 180 psig)- 150 Mscf 1319 to 1342 pm, paretial depressure (from 1500 to 180 psi)- 150 Mscf Total volume for 3 dé 1lressurizations- 687 Mscf I I 2. Flaring off Strabilizer Overhea9. Mtr.#660 T/C-1855 shutdown due to failed solenoid on engine Blow Off Valve (BOV) control. I 3. Lîq. to the HP flare I Bum Pit ~rom TfC-1855 HP suction drum in order to restart compressor. Mtr. #618 ~ I I I I i Action Taken to Stop Flaring: I I 1. Completion of depressurization! 2. 0845- began warming; L TS bottþms temperature until out of the flare at 101 Oam. 3. Maximum assist gas applied tol improve combustion quality and reduce emmisions. i Monday, May 06, 2002 Page 1 of 1 FACILITY: CGF SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0245 BPXA FLARE REPORT PRUDHOE BAY DATE: 21 Apr 2002 TIME OF FLARING Start Stop Duration 11 :49 14:32 2 Hrs 43 Mins Black Intermittent Smoke o 0 TOTAL VOLUME 2,720 MSCF First Determination of Cause: 1. Blew down L TS#3 for leak repair. Leak repair on residue gas header.(FE-74) Action Taken to Stop Flaring: 1. Oepressure completed and leak was repaired. Tuesday, April 30, 2002 Planned VOLUME ~ 2,720 MSCF Page 1 of 1 bp FACILITY: CGF SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0262 BPXA FLARE REPORT PRUDHOE BAY DATE: 26 Apr 2002 TIME OF FLARING Start Stop Duration 13:00 15:03 2 Hrs 3Mins First Determination of Cause: 1. 1883 Start attempts (4) Action Taken to Stop Flaring: 1. Machine SO and depressured Tuesday, April 30, 2002 Black Intermittent Smoke ~ 0 Planned TOTAL VOLUME o VOLUME 250 MSCF 250 MSCF Page 1 of 1 bp REPORT NO: 02-0264 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 27 Apr 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 02:00 04:40 2 Hrs 40 Mins Black Intermittent Smoke ~ 0 Planned VOLUME o 3,655 MSCF TOTAL VOLUME 3,655 MSCF First Determination of Cause: 1. Upset in Refrig. section of the plant - caused T /C-1805 to recyle trip/coolstop on low flow/high suction pressure condition. Action Taken to Stop Flaring: 1. Decreased plant feed rate to stabilize ref rig. section-Stabilized flow/ loaded refrig compressors, loaded T /C-1805. The 2 hrs. 40 min. covers the whole incident. We were bumping the flare off and on during that time frame while we attempting to get the MI compressor reloaded Tuesday, April 30, 2002 Page 1 of 1 REPORT NO: 02-0270 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 29 Apr 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 16:20 19:20 3 Hrs 0 Mins Black Intermittent Smoke Planned o 0 ~ VOLUME 430 MSCF 430 MSCF TOTAL VOLUME First Determination of Cause: 1. Planned shutdown of T/C-1885 (Tandem -3) for waterwash. Unit sid and depressured for work. Action Taken to Stop Flaring: 1. Unit depressured Tuesday, April 30, 2002 Page 1 of 1 REPORT NO: 02-0269 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 28 Apr 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 21:40 22:10 0 Hrs 30Mins Black Intermittent Smoke Planned o 0 ~ VOLUME 430 MSCF 430 MSCF TOTAL VOLUME First Determination of Cause: 1. Planned sid of Tandem-2 (waterwash/boroscope). Unit shutdown and depressured for work. Action Taken to Stop Flaring: 1. Unit depressured. Tuesday, Apnl 30. 2002 Page 1 of 1 bp REPORT NO: 02-0271 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 30 Apr 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 02:15 02:18 OHrs 3Mins 0 0 ~ 10 MSCF 2. Flare/Relief Valve 06:56 07:00 OHrs 4Mins 0 0 ~ 420 MSCF 3. Flare/Relief Valve 10:19 10:25 OHrs 6Mins 0 0 ~ 10 MSCF 4. Flare/Relief Valve 14:37 14:43 OHrs 6Mins 0 0 ~ 10 MSCF 5. Flare/Relief Valve 15:49 15:52 OHrs 3Mins 0 0 0 225 MSCF TOTAL VOLUME 675 MSCF First Determination of Cause: 1. 1885 Tandem depressure from 70 psi prior to waterwash 2. Shut down and depressure 1886 Tandem for waterwash 3. 1886 depressure from 70psi for maintenance work 4. 1886 depressure after waterwash 5. 1886 Shut down while loading compressor Action Taken to Stop Flaring: 1. Let it depressure 2. Let it depressure 3. let it depressure 4. let it depressure 5. Let it depressure for restart. Thursday, May 02, 2002 Page 1 of 1 bp REPORT NO: 02-0193 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 02 Apr 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 06:55 07:04 0 Hrs 9 Mins 2. Controlled Blowdow 15:42 15:54 OHrs 12Mins Black Intermittent Smoke Planned VOLUME 0 0 ~ 255 MSCF 0 0 ~ 255 MSCF TOTAL VOLUME 510 MSCF First Determination of Cause: 1. 1801 Booster Comp BESO while testing SO equipment 2. 1802 Booster Comp BESO while testing SO equipment Action Taken to Stop Flaring: 1. Meter #618 Already SO, let it depressure 2. Meter #618 Already SO, let it depressure Tuesday, April 30, 2002 Page 1 of 1 bp REPORT NO: 02-0275 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 25 Apr 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Flare/Relief Valve 17:05 17:30 0 Hrs 25 Mins 2. Controlled Blowdow 17:10 17:45 OHrs 35Mins Black Intermittent Smoke Planned VOLUME 0 0 0 276 MSCF 0 0 ~ 387 MSCF TOT ~L VOLUME 663 MSCF First Determination of Cause: 1. Mtr. #660- Stabilizer Overhead. T /C-1855 shutdown for maintenance. 2. Mtr. #618- Emer. Est. T/C-1855 shutdown/blowdown for maintenance Action Taken to Stop Flaring: 1. Warming L TS bottoms temperature/raising chiller outlet temps 2. Oepressure complete Friday, May 03, 2002 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU OS/2002 CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 2,784,359 2. Reinjected 13,434,401 3. Flared or vented less than 1 hour. 4f35 ,?tJ I 4. Flared or vented greater than 1 hour ~ lD ~SLI (Supplemental report required - See 20 AAC 25.235) " 5. Pilot and Purge 29,873 6. Used for lease operations Fuel 3,354,531 Assist 46,246 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 19,670,399 8. NGL gas equivalent produced 2,784,359 9. Purchased gas 0 10. Transferred from: CCP 21,275,362 11. Transferred to: FS1, FS2, FS3 1,604,963 Remarks: I hereby cer¿ that th~Oing is true and correct to the best of my knowledge. Signature: .G.t. ~ Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety I~ 954 MCF :Jßp- I 2. Lease Use MCF 3. Conserv. Purposes MCF c~r~ 'ð /'¡~-v Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT May 2002 Page 1 ~Unplanned Events less than or equal to 1 hour DATE :tIME VOLUME PEsCRI!)TJOI\I Of INcIDIËf. T 8t cAUS¡: 5/10/2002 1031-1048 44 Not required for unplanned events which 5/12/2002 1606-1651 746 are less than or equal to 1 hour 5/14/2002 1353-1357 82 5/18/2002 1345-1415 387 5/23/2002 1153-1158 38 5/23/2002 1419-1519 2,307 5/23/2002 1419-1432 387 5/24/2002 1538-1548 278 5/29/2002 1754-1818 127 5/29/2002 1749-1804 126 TOTAL 4,522 ACTION TAKEN TO ELIMINATE CAUSE . . Not required for unplanned events which are less than or equal to 1 hour ¡Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIÞTIONOt=JNCIDENT&CAUSE 5/18/2002 1345-1645 10,217 See attachments 5/30/2002 0414-1729 700 5/30/2002 1240-1446 774 5/30/2002 1240-1608 4,776 TOTAL 16,467 IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME I)EsCI'UÞTIONOFINCIDENT&CAUSE See attachments TOTAL o ACTION TAKENTO ELIMINATE CAUSE See attachments 6/, ilo- LI ~ 3'67JA.Cf-"\ \. ">~f.vc. I Ð~ ,Iv-t.c. F) t. ~~4 ~~s/!) .:r~) 7 J,þ- ACTION. TAKEN TO ELIMINATE.CAUSE . See attachments ¡Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIMIË VOLUME DIËSCRIPTlONOF INCIDENT & CAUSE. See attachments TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 16,467 o 97,108 o o . ACTION TAKEN TQELlMINATECAUSE See attachments 6/6/2002 12:58 PM bp REPORT NO: 02-0316 BPXA FLARE REPORT PRUDHOE BAY ... FACILITY: CGF DATE: 18 May 2002 SYSTEM 1. Controlled Slowdow 2. Flare/Relief Valve TIME OF FLARING Black Sta Stop Duration Intermittent Smoke Planned VOLUME 4:15 OHrs 30 Mins 0 0 0 387 MSCF 6:45 3Hrs OMins 0 0 0 10,217 MSCF TOTAL VOLUME 10,604 MSCF First Determination of Cause: 1. MI Compressor 1805 besd emergency stop from overspeed trip. 2. ~mpressor 1805 shut~n malfunction of the electronic over speed trip function. Action Taken to Stop Flaring: 1. Compressor depressured 2. Imediately warmed up L TS 1 and 2 10 degrees to reduce MI flaring during start attempts. On failed starts Warmed up L TS 1 and 2 an additional 15 degrees. Restarted the MI compressor after 2 failed start attempts. Flare valve closed \ '\ ~, ~\^ß\t uJJ ~~\c,l~ ~~ ç J.-l?~~C~ L \ ~(Z/ \ \,\(V .... Î Tuesday, May 28,2002 Page 1 of 1 BPXA PR REPORT NO: 02-0340 LARE REPORT DHOE BAY FACILITY: CGF DATE: 30 May 2002 Iv TIME OF FLA ING Black SYSTEM Start Stop uration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 04:14 17:29 13 15 Mins ~ 0 0 700 MSCF 2. Flare/Relief Valve 12:40 14:46 2 6Mins ~ 0 0 774 MSCF 3. Flare/Relief Valve 12:40 16:08 3 28 Mins ~ 0 0 4,776 MSCF TOTAL VOLUME 6,250 MSCF First Determination of Cause: 1. Booster compressor T /C 1857 was shut own for water wash. Had problems with the starting logic which caused the compressor to blow d wn two times. 2. MI compressor T /C 1805 shutdown due 0 instrument/electrical malfunction. 3. MI compressor T/C 1805 shutdown due 0 instrument/electrical malfunction. Action Taken to Stop Flaring: 1. Compressor blow down completed. 2. Restarted and loaded T/C 1805. 3. Warmed all low temperature separators (L TS) bottoms temperatures to reduce MI production. Warmed all L TS chiller outlets to reduc MI production. Restarted and loaded T/C 1805. Sunday, June 02, 2002 Page 1 of 1 RE: CGF Flaring incident Subject: RE: CGF Flaring incident Date: Sun, 19 May 2002 12:48:32 -0500 From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> To: "'steve _ mcmains@admin.state.ak.us'" <steve _ mcmains@admin.state.ak.us> > > > > > > Leader, 907-659-5566 > > This note is to inform you of a flaring incident > which occurred on May 18, 2002. CGF MI compressor 1805 shut down due to a > malfunction of the electronic overspeed trip. The compressor was pumping > MI gas at the rate of -300 MM/D. The CGF Operators immediately reduced the > amount of MI gas make to minimize the flared volume. It took two attempts > to restart the compressor, and the machine was down for 3 hours. During > that time, 10,217 MSCF of gas was flared. > Please don't hesitate to call me with any questions. > > > > > To: Steve McMains, AOGCC steve mcmains@admin.state.ak.us 907-793-1241, fax 907-276-7542 From: Michael Bolkovatz, GPB Prod Optim Team Michael Bolkovatz GPB Production Optimization TL 659-5566 1 of 1 5/20/027:44 AM RE: CGF Flaring incident Subject: RE: CGF Flaring incident Date: Fri, 31 May 200223:04:35 -0500 From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> To: "'steve _ mcmains@admin.state.ak.us'" <steve _ mcmains@admin.state.ak.us> CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>, "Pfeiffer, Jim A" <PfeiffJA@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com> > > > > > > Leader, 907-659-5566 > > > > > > > > > > > > > > > > > > > > > To: Steve McMains, AOGCC steve mcmains@admin.state.ak.us 907-793-1241, fax 907-276-7542 From: Michael Bo1kovatz, GPB Prod Optim Team This note is to inform you of several flaring incidents which occurred on May 29, 2002. CGF shutdown Boosters 1801 & 1802 to repair wiring on the governor control. This in turn caused Tandem compressor 1885 to shutdown which caused high back pressure on the gas transit line causing GC1 & GC2 to automatically go to flare (for reaching their pressure safety limits). 1.1 BCFPD of gas was immediately shutin, but the flare valve at GC1 did not reset for 2 hrs and 13 mins (5450 MSCF) due to high pressure on the gas transit line/plant inlet HP separator and finally the suction knockout drum. GC2 flared for 45 minutes (938 MSCF) before their flare valve reset. Also, FS2 took A gas train down for vessel inspection/recertification. This requires depressuring the train to atmosphere, so the gas was sent to flare. A total of 378 MSCF was flared intermittently over 2 hrs and 20 minutes. It takes an extended period of time in order to completely depressure to 0 psi. Please don't hesitate to call me with any questions. Michael Bo1kovatz GPB Production Optimization TL 659-5566 I of! 6/2/02 8:34 AM Facility ALASKA OIL AND GAS CONSERVATICN COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 06/2002 CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 2,599,110 2. Reinjected 11,193,948 :r~ 3. Flared or vented less than 1 hour. 13/'%'3 ~ 4. Flared or vented greater than 1 hour J (Supplemental report required - See 20 AAC 25.235) Z7.110 5. Pilot and Purge 28,649 6. Used for lease operations Fuel 3,171,886 Assist 48,190 7. Other Lift Gas, Off Field 0 TOTAL items 1 . 7 17,082,728 8. NGL gas equivalent produced 2,599,110 9. Purchased gas 0 10. Transferred from: CCP 18,296,760 11. Transferred to: FS1, FS2, FS3 1,214,032 Remarks: I hereby ce~ that t~ fOregOin~S true and correct to the best of my knowledge. Signature: D. A A ^"'^ .1J.. Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1 . Safety Z-"0J7O MCF ~ 2. Lease Use MCF 3. Conserv. Purposes MCF (ß. ~~v ~I, {o;y com~er D Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT June 2002 Page 1 IUnplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTIONOFJNCIDENT&-ICAUSE 6/1/2002 1840-1910 350 Not required for unplanned events which 6/8/2002 1345·1425 1,800 are less than or equal to 1 hour 6/11/2002 2246-2251 1 AOO 6/13/2002 0004-0009 1,400 6/15/2002 0900-0920 ~5ee_ t.e"1ow 6/15/2002 1143-1203 387 6/15/2002 1143-1243 3,000 6/16/2002 0608-0628 ....aa:f- Stile j)e.1cW 6/20/2002 0538-0543 1 AOO 6/25/2002 1456-1527 400 6/25/2002 1635-1646 169 6/25/2002 1640·1715 430 6/25/2002 1648-1720 328 6/26/2002 0904-0934 328 6/26/2002 0904-1001 1,971 6/30/2002 0125-0150 ~ 5el!.. !xoJow ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour TOTAL ~ I ~ 3(;,,3 58.L 'B ,(oz.- IUnplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT &- CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/8/2002 0043-0147 v5,222 See attachments See attachments 6/15/2002 0900-1025 .-11,216 ...¡..38] 6/16/2002 0608-0812 "'Í,626 T 3'07 6/16/2002 0932·1036 ....1', 753 6/24/2002 1234-1403 0/2,380 6/25/2002 2110-2359 ....-'828 6/26/2002 0005-0731 --7,792 6/30/2002 0125-0238 "2,192 .¡. 3\:.'07 TOTAL ~ 27170 S"ß.e.... 6' , 10"V' ¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT &- CAUSE ACTION TAKEN TO ELIMINATE CAUSE 6/30/2002 1345-1405 25 See attachments See attachments 6/30/2002 1405-1430 387 TOTAL 412 5000 Mcf attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour 26,009 Planned Events < 1 hour and not 412 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 117,784 7/9/2002 11:06AM REPORT NO: 02-0360 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 08 Jun 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME / 00:43 01:47 1 Hrs 4Mins 0 0 0 5,222 MSCF 13:45 14:25 OHrs 40 Mins 0 0 0 1,800 MSCF TOTAL VOLUME 7,022 MSCF First Determination of Cause: 1. Both MI compressors shut down. MI1 SO on unexplained overspeed trip. MI2 SO 3 minutes later on high vibration while loading it. 2. Increased MI production due to start up of 1806 Refrig Compressor Action Taken to Stop Flaring: 1. Restarted and loaded one MI compressor 2. Loaded 2nd MI compressor Saturday, June 29, 2002 Page 1 of 1 REPORT NO: 02-0377 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 15 Jun 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 09:00 09:20 OHrs 20 Mins 2. Flare/Relief Valve 09:00 10:25 1 Hrs 25 Mins 3. Controlled Blowdow 11:43 12:03 OHrs 20 Mins 4. Flare/Relief Valve 11:43 12:43 1 Hrs OMins Black Intermittent Smoke Planned 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL VOLUME First Determination of Cause: 1. volume flared on the depressuring of 1805 MI compressor to zero PSI Meter 618 <JB¡e 3/1)0'2- 4-~3 /"lSCF 2. 1805 mi compressor shut down on hi compressor vibration due to the high stage recycle trip. This volume is the flare off of the Stabilizer overhead drum. Meter 660 3. Volume flared on the depressureing of 1805 MI compressor to zero psi. Meter 618 4. Compressor 1805 shut down on governor failure. This is the volume off the stabilizer overhead drum. Meter 660 Action Taken to Stop Flaring: 1. Compressor depressured 2. Restarted compressor and flare valve closed 3. Compressor depressured 4. Cleared governor failure, restarted compressor. Saturday, June 29, 2002 Page 1 of 1 REPORT NO: 02-0381 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 16 Jun 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke 1. Flare/Relief Valve 02:03 02:04 o Hrs 1 Mins ~ 0 2. Controlled Blowdow 06:08 06:28 OHrs 20 Mins 0 0 3. Flare/Relief Valve 06:08 08:12 2 Hrs 4Mins 0 0 4. Flare/Relief Valve 09:32 10:36 1 Hrs 4Mins 0 0 Planned VOLUME :::-\MSCF i <:: ¿:~:(?~ ~7" J ~1.3,..{ç<1= 1,753 MSCF./ A'"' <Jße. ~N°z-- o o o o TOTAL VOLUME 3,766 MSCF First Determination of Cause: 1. MI 1805 shutdown on Governor Failure. Compressor blew down to zero PSI. Meter #618 2. MI Compressor 1805 shut down on governor malfunction. Meter #660 3. Flared due to upset in the Stabilizer section of the plant during MI Start up Meter #660 Action Taken to Stop Flaring: 1. Compressor depressured. 2. Heated up L TS 1 2 & 3 also bypassed L TS 3 to get out of the flare. 3. Got MI 1805 on line stabilizing the upset and flare valve closed. Saturday, June 29, 2002 Page 1 of 1 REPORT NO: 02-0394 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 24 Jun 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 12:34 14:03 1 Hrs 29Mins Black Intermittent Smoke ~ 0 Planned VOLUME o 2,380 MSCF v TOTAL VOLUME 2,380 MSCF First Determination of Cause: 1. T /C 1805 shutdown on high high liquid level in HP Suction Drum. Action Taken to Stop Flaring: 1. 12:52 First restart attempt - Failed. 12:57 starting warming chillers and warming L TS bottoms temperature to reduce flaring. Shutdown Booster fin fans. 13: 14 Second restart attempt - failed. 13:33 Third restart attempt - successful. 13:39 Warm up 13:56 Loaded 1805 compressor. 14:03 Out of Flare. Saturday, June 29, 2002 Page 1 of 1 bp REPORT NO: 02-0398 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 25 Jun 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 14:56 15:27 OHrs 31 Mins 0 0 0 400 MSCF 2. Flare/Relief Valve 16:35 16:46 OHrs 11 Mins 0 0 0 169 MSCF 3. Flare/Relief Valve 16:40 17:15 Hrs 35 Mins 0 0 0 430 MSCF 4. Flare/Relief Valve 16:48 17:20 OHrs 32 Mins 0 0 0 328 MSCF 5. Flare/Relief Valve 21:10 23:59 2Hrs 49 Mins ~ 0 0 828 MSCF V TOTAL VOLUME 2,155 MSCF First Determination of Cause: 1. Tandem#3 Tripped off line on underspeed trip 2. Excessive pressure due to Bringing on Tandem #3 while in High Ambient conditions 3. Tandem #4 SID on a Manual Halon Dump 4. MI#1 Quit pumping and shut-down on a High liquid level in the HP Suction Drum 5. MI#1 intermettently loading and unloading due to insufficient feed, caused by high ambient temperature. Action Taken to Stop Flaring: 1. Unit completed blowdown" ,ready to start Meter #618 2. Adjusted MI#2's load Meter #660 3. Refilled Halon vessel, ready to start Meter #618 4. Completed blowdown and restarted tic Meter #618 Saturday, June 29, 2002 Page 1 of 2 REPORT NO: 02-0398 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 25 Jun 2002 7. Adjusted process to give compressor adequate suction feed to get forward flow from MI#1. On and off the flare-Ambient temperature problem contributing to delay in getting the machine to pump. Backed on line MI compressor down, (MI#2), several times, adjusted recycles, trying to keep MI#1 loaded. Saturday, June 29, 2002 Page 2 of 2 REPORT NO: 02-0401 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 26 Jun 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned 1. Flare/Relief Valve 00:05 07:31 7Hrs 26 Mins ~ 0 0 2. Flare/Relief Valve 09:04 09:34 OHrs 30 Mins 0 0 0 3. Flare/Relief Valve 09:04 10:01 OHrs 57 Mins 0 0 0 TOTAL VOLUME First Determination of Cause: 1. Flare off Stabilizer Overhead. MI Compressor #1 intermittently unloads/loads. (Mtr. #660) 2. Mtr#618 Estimate"MI#1 shut-down on a high hp suction drum level 3. Excessive pressure due to MI#1 tripping off line",MTR#660 VOLUME 7,792 MSCF 328 MSCF 7: SI"1~ 1 ,971 MSCF J ~",<eð « Iltt-) 10,091 MSCF . --r; vEt? 8/,fol- Action Taken to Stop Flaring: 1. Adjusted process to get the compressor to stay loaded. Continuous attention to the situation while trouble shooting the problem. 2. Completed blowdown and restarted 3. Adjusted plant accordingly Saturday, June 29, 2002 Page 1 of 1 REPORT NO: 02-0407 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 30 Jun 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black VOLUME Sr~k. e(,'V+ Start Stop Duration Intermittent Smoke Planned 01:25 01:50 OHrs 25 Mins 0 0 0 387 MSC~ ZS'7?Hfioi" 01:25 02:38 1 Hrs 13 Mins 0 0 0 2,192 MSCF/ TOTAL VOLUME 2,579 MSCF First Determination of Cause: 1. T/C 1805 SD on high vibration and blew down due to low seal oil differential pressure. 2. T/C 1805 MI compressor coolstopped on high suction pressure then shutdown on high vibration. Action Taken to Stop Flaring: 1. T/C 1805 blowdown complete 2. Restarted T /C 1805 Monday, July 01,2002 Page 1 of 1 Facility CENTRAL GAS FACILITY Disposition 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRCDUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 07/2002 Volume MCF" "Indicate contribution of each pool to total. 2,264,188 Pool Name Code Percent 7,348,231 PRUDHOE 640150 100.00% 15,764 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 6. Used for lease operations 7. Other 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: CCP 11. Transferred to: FS1, FS2, FS3 Remarks: TOTAL items 1 - 7 Signature: Form 10-422 (Revised 4/95) true and correct to the best of my knowledge. Title: SUPERVISOR 119,051 29,345 Fuel Assist 2,646,720 54,836 Lift Gas, Off Field o 12,478,135 1. Safety I\Qío6 \ MCF Ja2- 2,264,188 2. Lease Use MCF o 3. Conserv. Purposes MCF 13,781,681 ~~~~ CommissiQ,er f;I "{p(pf6Y Date 1 ,303,546 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. DA 7/1/2002 7/4/2002 7/11/2002 7/12/2002 7/12/2002 7/15/2002 7/16/2002 7/16/2002 7/16/2002 7/16/2002 7/16/2002 7/16/2002 7/16/2002 7/24/2002 7/26/2002 7/26/2002 7/26/2002 7/27/2002 7/28/2002 7/31/2002 7/31/2002 7/31/2002 7/31/2002 7/31/2002 7/31/2002 7/31/2002 0704- 2034-2044 1508-1514 0716-0721 0800-0815 1846-1918 0319-0334 051 9-0534 0736-0835 0755-0825 1131-1146 1131-1154 1320·1340 0000-0005 0315-0330 0350-0420 0920-0940 2025-2034 2055·2125 0146-0200 0350-0400 0400·0412 0500-0514 0540-0555 0540-0554 1900-1911 TOTAL 1 hour E DESCRIPTION OF INCIDENT & CAUSE 387 Not required for unplanned events which 387 are less than or equal to 1 hour 70 97 72 2,31 65 715 1,184 387 387 1,472 387 400 328 328 50 328 362 328 328 328 328 328 328 400 12,677 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT July 2002 Page 1 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour 8/19/2002 11:02 AM BP EXPLORATION (ALASKA) INC. Page 2 PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT July 2002 lunPlanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/1/2002 0704-0826 11,115 See attachments See attachments 7/16/2002 0319-0434 11 ,886 7/16/2002 0519-0703 14,560 7/16/2002 1320-1431 3,083 7/23/2002 0930-1238 22,544 Intermittent 7/23/2002 0930-1210 744 7/26/2002 0310-0540 7,560 7/26/2002 0350-0540 7,124 7/26/2002 0710-0840 9,082 7/31/2002 0250-0500 19,353 Intermittent TOTAL 107,051 Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 7/4/2002 0150-0215 25 See attachments 7/4/2002 1934-1959 25 7/4/2002 2326-2347 25 7/5/2002 1950-2010 387 7/7/2002 2104-2124 25 7/26/2002 0120-0140 430 7/26/2002 0341-0405 430 7/26/2002 0710-0740 430 7/26/2002 0805-0855 880 7/30/2002 1807-1824 430 TOTAL 3,087 ACTION TAKEN TO ELIMINATE CAUSE See attachments ~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 7/26/2002 1130-1615 12,000 See attachments TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME ACTION TAKEN TO ELIMINATE CAUSE See attachments 12,000 TOTAL 12,677 107,051 3,087 12,000 218,996 8/19/2002 11:02 AM bp REPORT NO: 02-0409 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 01 Jul 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 07:04 08:26 1 Hrs 22 Mins Black Intermittent Smoke o 0 Planned VOLUME o 11,115 MSCF TOTAL VOLUME 11,115 MSCF First Determination of Cause: 1. MI#2 turbine/compressor tripped due to an over pressure condition on the suction of the unit resulting from the loss of power to the suction pressure controller. Mtr #660 Action Taken to Stop Flaring: 1. Problem corrected and The unit was restarted. Monday, July 22, 2002 Page 1 of 1 REPORT NO: 02-0421 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 04 Jul 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:50 02:15 OHrs 25 Mins 0 0 ~ 25 MSCF 2. Flare/Relief Valve 19:34 19:59 OHrs 25 Mins 0 0 ~ 25 MSCF 3. Flare/Relief Valve 20:34 20:44 OHrs 10 Mins 0 0 0 387 MSCF 4. Flare/Relief Valve 23:26 23:47 OHrs 21 Mins 0 0 ~ 25 MSCF TOTAL VOLUME 462 MSCF First Determination of Cause: 1. Blew down T /C 1806 for maint. Meter # 618 2. Blew down T/C 1856 for maint and ESD testing. Meter # 618 3. Blew down T/C 1805 Due to gas leak on F123 valve during start up. Meter # 618 4. Blew down T/C 1856 for maint. Meter # 618 Action Taken to Stop Flaring: 1. Blow down completed 2. Blow down completed. 3. Blow down completed. 4. Blow down completed. Monday, July 22, 2002 Page 1 of 1 REPORT NO: 02-0426 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 05 Jul2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 19:50 20: 1 0 0 Hrs 20 Mins Black Intermittent Smoke Planned o 0 ~ VOLUME 387 MSCF 387 MSCF TOTAL VOLUME First Determination of Cause: 1. Blew down T/C 1855 for CCC controller upgrade and first stage compressor seal replacement. Meter # 618 Action Taken to Stop Flaring: 1. Blow down completed. Monday, July 22, 2002 Page 1 of 1 bp FACILITY: CGF SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0431 BPXA FLARE REPORT PRUDHOE BAY DATE: 07 Jul 2002 TIME OF FLARING Start Stop Duration 21 :04 21 :24 0 Hrs 20 Mins First Determination of Cause: 1. Blew down T /C 1856 Refer #2 to Puge nitrogen out of propane system. Meter # 618 Action Taken to Stop Flaring: 1. Blow down completed Monday, July 22, 2002 Black Intermittent Smoke o 0 Planned TOTAL VOLUME ~ VOLUME 25 MSCF 25 MSCF Page 1 of 1 REPORT NO: 02-0446 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 16 Jul 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 03:19 03:34 OHrs 15 Mins 0 0 0 656 MSCF 2. Flare/Relief Valve 03:19 04:34 1 Hrs 15 Mins 0 0 0 11 ,886 MSCF 3. Flare/Relief Valve 05:19 05:34 OHrs 15 Mins 0 0 0 715 MSCF 4. Flare/Relief Valve 05:19 07:03 1 Hrs 44 Mins 0 0 0 14,560 MSCF 5. Flare/Relief Valve 07:36 08:35 OHrs 59 Mins 0 0 0 1,184 MSCF 6. Flare/Relief Valve 07:55 08:25 OHrs 30 Mins 0 0 0 387 MSCF 7. Flare/Relief Valve 11 :31 11:46 OHrs 15 Mins 0 0 0 387 MSCF 8. Flare/Relief Valve 11:31 11:54 OHrs 23 Mins 0 0 0 1,472 MSCF 9. Flare/Relief Valve 13:20 13:40 OHrs 20 Mins 0 0 0 387 MSCF 10. Flare/Relief Valve 13:20 14:31 1 Hrs 11 Mins 0 0 0 3,083 MSCF TOTAL VOLUME 34,717 MSCF First Determination of Cause: 1. MI1805 and 1855 blew down to 180 PSI on the Hi Hi suction pressure shutdowns. (Mtr.618) 2. 1805 MI Compressor recycle tripped and shut down on Hi Hi suction pressure. This hi hi suction pressure also shutdown 1855 MI Compressor. (Mtr.660) 3. Both MI compressors blew down due to the speed control signal swing. MI1805 blew down to 180 psi MI1855 blew all the way down to zero. 4. Both MI1805 and 1855 shutdown on Hi Hi suction pressure due to a signal glitch when going from manual speed control to automatic swinging the compressors.(Mtr.660) 5. 1855 MI compressor shutdown on HI HI suction pressure.MI Flare valve F 431 opened to relieve over pressure of the MI Suctions caused by the shutdown and the ambient temperture rapidly increasing. (Mtr 660) Tuesday,August06,2002 Page 1 of 2 ---- bp TAX DEPT. ALASKA 141002 08/21/2002 13:52 FAX 907 564 4094 REPORT NO: 02-0446 BPXA FLARE REPORT PRUDHOE BAY FACIUTY: CGF DATE: 16 Jul2002 b ~1855 Mi Compressor shutdown and depressured to zero psi. due to hi hi suction pressure plant upset from ambient temperture increase. (Mtr 660) 1 n MI 1GG Turbine unit high vibration caused shutdown. (Mtr#618) ~ d.K MI1 GG Turbine unit high vibration caused shutdown. F431 opened to flare. (Mtr 660) 4 .).8:" MI 2 blew down to zero after shutting down. (Mtr #61 B) l" ~ MI 2 shutdown on r¢ycle trip on HH suction pl'éSsure. MI composition was too light to pump due to high ambient with plant upsets. (Mtr. #660) , Action Taken to Stop Flaring: 1. Compressors reached 180 PSI and the flare valves closed. I I I 2. Opened plant bypass F202 to ruduce flaring. Restarted and loaded both MI Compressors 3. Both compressor flare valves closed when they reached the automatic vent set pressure for each type of Shutdown. 4. Opened the plant bypass and warmed up L TS 1 and 2 to reduce flaring. Started and loaded both MI Compressors. 5. Opened the plant bypass some more and increaced the L TS 1 and 2 tempertures and shut down Referigerant compressor 1856 to reduce flaring and unload the plant. 6_ Compressor completed venting and the flare valve closed. 7. Unit depressured : 8. Loaded MI 2 that was on stand~by at idle. Repairs made to M11. 9. Flare valves closed after blow down and MI1 was loaded- I 10. Opened plant bypass on LTS 1/2 more to reduce load. Mlloaded. MI1 ~ on stand·by idle. Heated up stabilizers to correct MI composition. Tuesday, August06,2002 Page 2 of 2 bp REPORT NO: 02-0461 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 23 Jul 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 09:30 12:38 3Hrs 8Mins ~ 0 0 22,544 MSCF 09:30 12:10 2Hrs 40 Mins 0 0 0 744 MSCF TOTAL VOLUME 23,288 MSCF First Determination of Cause: 1. Flare off Stab. OH due to MI compressor problems. (Mtr. 660) 2. Shutdown of 1855 MI compressor, followed by 1805 MI compressor due to light gas composition. (Mtr. 618) Action Taken to Stop Flaring: 1. Made plant operating changes to lessen MI production and produce heavier MI gas. Restarted MI compressors. 2. Units depressured Tuesday, August 06, 2002 Page 1 of 1 REPORT NO: 02-0478 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 26 Jul 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:20 01:40 OHrs 20 Mins 0 0 ~ 430 MSCF 2. Flare/Relief Valve 03:10 05:40 2 Hrs 30 Mins 0 0 0 7,560 MSCF 3. Flare/Relief Valve 03:15 03:30 OHrs 15 Mins 0 0 0 328 MSCF 4. Flare/Relief Valve 03:41 04:05 o Hrs 24 Mins 0 0 ~ 430 MSCF 5. Flare/Relief Valve 03:50 04:20 OHrs 30 Mins 0 0 0 328 MSCF 6. Flare/Relief Valve 03:50 05:40 1 Hrs 50 Mins 0 0 0 7,124 MSCF 7. Flare/Relief Valve 07:10 07:40 OHrs 30 Mins 0 0 ~ 430 MSCF 8. Flare/Relief Valve 07:10 08:40 1 Hrs 30 Mins 0 0 0 9,082 MSCF 9. Flare/Relief Valve 08:05 08:55 OHrs 50 Mins 0 0 ~ 880 MSCF 10. Flare/Relief Valve 09:20 09:40 OHrs 20 Mins 0 0 0 50 MSCF 11. Flare/Relief Valve 11:30 16:15 4Hrs 45 Mins 0 0 ~ 12,000 MSCF TOTAL VOLUME 38,642 MSCF First Determination of Cause: 1. Tandem 2 besd for planned work 2. MI2 SO on recycle trip after loosing load because of gas composition 3. MI 2 sesd after recycle trip 4. Tandem 3 besd for planned work 5. MI2 sesd after recycle trip 6. MI 1 SD on High Suction pressure after loosing load because of gas compositon, low rates 7. Tandem 1 besd for planned work 8. MI 1 SD on high suction pressure after loosing load, gas compositon, low rates Thursday, August 01, 2002 Page 1 of 2 ~~/21/2002 1~: 52 FA~ 907 564 4094 bp TAX DEPT. ALASKA i4I 003 REPORT NO: 02~0478 ö BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF ,DATE: 26 Jul2002 , , 9' j.ð':' Tandem 4 besd for planned work followed by Tandem station besd for planned work I ö "" Inlet high pressure from field. (P203 opened) ,\ ~ Planned blowdown of APEX lines for planned work Action Taken to Stop Flaring: , _ Unit shutdwon 2. Warming up L TS's t? reduce MI make 3. Unit shut down 4. Unit shut down 5. Unit shut down 6. Warming up LTS's to reduce MI make, and restarting MI1 7. Unit shut down B. Warmed up L TS's additionally to reduce MI make, and restarting MI , took two start attmepts 9. Units shut down , O. EOC cut gas rate 11. Lines depressured : NOTE: ON THE PRINT OUT OF THIS REPORT UNDER DETERMINATION OF CAUSE, THERË ARE 11 ENTRIES, BUT THEY HAVE BEEN MISS NUMBERED SOME HOW ON THE PRINT OUT RE('::EIVED AI_Oii '" Giii W¡$. C;O¡11!i1!SSiúr AtØOfaQe TIlursday, August 01, 2002 Page 2 of 2 FACILITY: CGF SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0498 BPXA FLARE REPORT PRUDHOE BAY DATE: 30 Jul 2002 TIME OF FLARING Start Stop Duration 18:07 18:24 0 Hrs 17 Mins First Determination of Cause: 1. SDT/C 1886. BLEW DOWN FOR MAl NT. Action Taken to Stop Flaring: 1. FINISHED BLOW DOWN Thursday, August 01, 2002 Black Intermittent Smoke o 0 Planned TOTAL VOLUME ~ VOLUME 430 MSCF 430 MSCF Page 1 of 1 REPORT NO: 02-0522 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 31 Jul 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 01:46 02:00 OHrs 14 Mins 0 0 0 328 MSCF 2. Flare/Relief Valve 02:50 05:00 2Hrs 10Mins ~ 0 0 19,353 MSCF 3. Flare/Relief Valve 03:50 04:00 OHrs 10 Mins 0 0 0 328 MSCF 4. Flare/Relief Valve 04:00 04:12 o Hrs 12 Mins 0 0 0 328 MSCF 5. Flare/Relief Valve 05:00 05:14 OHrs 14 Mins 0 0 0 328 MSCF 6. Flare/Relief Valve 05:40 05:55 OHrs 15 Mins 0 0 0 328 MSCF 7. Flare/Relief Valve 05:40 05:54 OHrs 14 Mins 0 0 0 328 MSCF 8. Flare/Relief Valve 19:00 19:11 OHrs 11 Mins 0 0 0 400 MSCF TOTAL VOLUME 21,721 MSCF First Determination of Cause: 1. Compressor 1805 shutdown/depressured (Mtr 618) 2. MI Comp 1805/55 lost flow recycle tripped (Mtr 660) 3. T/C-1855 sid on high exhaust temp. (Mtr 618) 4. T /C-1805 sid recycle trip (Mtr 618) 5. T/C-1805 sid recycle trip (Mtr 618) 6. T/C-1805 sid high stg low seal oil dp (Mtr 618) 7. T/C-1855 sid (Mtr 618) Tuesday,August06,2002 Page 1 of 2 08(~1/2002 1~:53 FAX 907 564 4094 bp TAX DEPT. ALASKA 141004 REPORT NO: 02-0522 bp o BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF 'DATE: 31 Jul2002 , ~ ~Tandem Comp 1SSS sid due to exhaust thermocouple high dt (Mtr 618) , Action Taken to Stop Flaring: 1. Unit depressurec! 2. Stab OH to fir .(mtr.660) Adiusted L TS Btms:temp, restarted units 3. Unit de pressured 4. Unit depressured 5. Unit depressured 6. Unit depres5ured 7. Unit depressured , 8. Jumpered thermoc6uples and restarted camp RECEn/El) "1<:1","", n"1< F. " -"'IIi\.,ØtI!ltU~;I .....,. '. A~".I\·(~ i .Qf¡¡m!ss (¡! it1t'< Tuesday, August 06, 2002 Page 2 of 2 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRCDUCED GAS DISPOSITION Operator Field(s) BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 2,405,161 2. Reinjected 9,912,513 3. Flared or vented less than 1 hour. 7,950 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 29,887 6. Used for lease operations Fuel 2,906,650 Assist 42,757 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 15,304,918 8. NGL gas equivalent produced 2,405,161 9. Purchased gas 0 10. Transferred from: CCP 16,635,853 11. Transferred to: FS 1, FS2, FS3 1,330,935 Remarks: I hereby ce7J.O~ t~ foregoing ~true and correct to the best of my knowledge. Signature: . . ~ A ^.A J 1 Title: SUPERVISOR . I Form 10422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT August 2002 Page 1 ~UnPlanned Events less than or equal to 1 hour DATE TIME VOLUMEDE$GRI¡'>1'IONO¡;:¡NGIDEI'{$·'&,tCAI1SE 8/2/2002 0722-0732 328 Not required for unplanned events which 8/2/2002 1219-1226 78 are less than or equal to 1 hour 8/2/2002 2229-2317 328 8/3/2002 0206-0236 2,870 8/3/2002 0206-0251 328 8/3/2002 0507-0552 387 8/11/2002 1250-1303 400 8/15/2002 1300-1320 196 8/19/2002 1436-1440 41 8/25/2002 1320-1340 140 8/25/2002 1449-1458 26 8/26/2002 1057-1102 59 8/27/2002 1534-1543 387 8/29/2002 1831-1854 1 ,447 TOTAL 7,015 Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT lit CAUSE See attachments TOTAL o ------------- u Planned Events Less Than or Equal 1 Hour AND Not Exceeding 51tOO_M.ct. DAcTE TIME VOLUME DESCRIP1'rroNtoFt;JNCIDENTt&,'GAuSE 8/25/2002 1515-1530 328 See attachments 8/30/2002 1630-1640 328 8/31/2002 0800-0810 59 8/31/2002 1350-1400 100 8/31/2002 1950-2014 120 TOTAL 935 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mef DATE TIME VOLUME DESCRIÞTIONOF INCIDENT&.CAU$E See attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 7,015 o 935 o 80,594 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments 9/1212002 4:51 PM REPORT NO: 02-0574 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 25 Aug 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 13:20 13:40 OHrs 20Mins 0 0 0 140 MSCF 2. Flare/Relief Valve 14:49 14:58 OHrs 9Mins 0 0 0 26 MSCF 3. Flare/Relief Valve 15:15 15:30 OHrs 15 Mins 0 0 ~ 328 MSCF TOTAL VOLUME 494 MSCF , First Determination of Cause: 1. Flaring for CCP- T /C-1807 maint unloaded unit (Mtr. #664) 2. Flaring for CCP- T/C-1813 sid (Mtr. #664) 3. Shutdown T/C-1805 due to lack of feed rate/high vibration (Mtr.#618) Action Taken to Stop Flaring: 1. Maint. Complete T /C-1807 at CCP reloaded 2. Process pressure settled out allowing 01 P-203A V to be closed. 3. Unit depressured Tuesday, September 03,2002 Page 1 of 1 FACILITY: CGF SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0596 BPXA FLARE REPORT PRUDHOE BAY DATE: 30 Aug 2002 TIME OF FLARING Start Stop Duration 16:30 16:40 OHrs 10Mins Black Intermittent Smoke o 0 Planned ~ TOTAL VOLUME First Determination of Cause: 1. SID T /C-1855- lack of feed rate/high vibr on unit (Mtr.#618) Action Taken to Stop Flaring: 1. Unit depressured Tuesday, September 03,2002 VOLUME 328 MSCF 328 MSCF Page 1 of 1 REPORT NO: 02-0599 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 31 Aug 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 08:00 08:10 OHrs 10Mins 0 0 ~ 59 MSCF 2. Flare/Relief Valve 13:50 14:00 OHrs 10Mins 0 0 ~ 100 MSCF 3. Flare/Relief Valve 19:50 20:14 OHrs 24Mins 0 0 ~ 120 MSCF TOTAL VOLUME 279 MSCF First Determination of Cause: 1. T/C-1855 depressured from 180 psig to 0 psig for maint. (Mtr. #618) 2. T/C-1855 Inst prob on start-up. Depressured from 250 psig to 0 psig. Vol est (Mtr.#618) 3. T/C 1855 Depressured from 350 psi to 0 psi."Seal Oil High D.P. SID Volume Estimate Meter #618 Action Taken to Stop Flaring: 1. Depressure complete 2. Depressure complete 3. Depressure Completed Tuesday, September 03,2002 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 09/2002 CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 2,186,773 2. Reinjected 9,495,417 3. Flared or vented less than 1 hour. 13,397 4. Flared or vented greater than 1 hour 13,543 v (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 28,622 6. Used for lease operations Fuel 2,923,783 Assist 59,879 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 14,721,414 8. NGL gas equivalent produced 2,186,773 9. Purchased gas 0 10. Transferred from: CCP 15,944,874 11. Transferred to: FS1, FS2, FS3 1 ,223,460 Remarks: I hereby ce{). 0,t,t~ foregoino is true and correct to the best of my knowledge. Signature: . , 1 A ,,"^ 11 Title: SUPERVISOR Form 1 0-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1 . Safety MCF 13543 I 2. Lease Use MCF 3. Conserv. Purposes MCF Cw \~ fJ--b Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT September 2002 Page 1 ~Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTIONO¡:JNCIOENT&CAUSE 9/4/2002 1624-1635 328 Not required for unplanned events which 9/5/2002 1530-1535 50 are less than or equal to 1 hour 9/6/2002 1745-1830 431 9/6/2002 2102-2113 72 9/6/2002 2116-2131 100 9/7/2002 1418-1432 67 9/8/2002 1550-1605 340 9/12/2002 1130-1140 400 9/13/2002 2025-2045 400 9/14/2002 0650-0720 \. 387 9/14/2002 0652-0722 387 9/14/2002 0825-0855 387 9/21/2002 1332-1352 400 9/21/2002 1502-1522 400 9/27/2002 1523-1611 7,676 TOTAL 1 Unplanned Events greater th DATE TIME 9/14/2002 0652-0845 TOTAL ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ~. -b crfI4/ÙZ- ~.J ~~<.J 1°,(,(;4 1 hour !fOLUME DESCRIPTION OF INCIDENT & CAUSE 13,543 See attachments ~1~ 14, 1M ~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 9/20/2002 0430-0445 255 See attachments 9/20/2002 0650-0720 255 9/23/2002 1650-1735 1,062 56~ I?( ~Ù"l- ACTION TAKEN TO ELIMINATE CAUSE See attachments j'eR- 'z\ rd O'Z-- TOTAL 1,572 ~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME o )O,bYi ~ 14.,7CtJr 1,572 ° 115,441 ACTION TAKEN TO ELIMINATE CAUSE See attachments 5v- \ v\ /~v)- 10/15/2002 1:42PM bp REPORT NO: 02-0647 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 14 Sep 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 06:50 07:20 OHrs 30 Mins 0 0 0 387 MSCF 2. Flare/Relief Valve 06:52 08:45 1 Hrs 53 Mins 0 0 0 13,543 MSCF 3. Flare/Relief Valve 06:52 07:22 OHrs 30 Mins 0 0 0 387 MSCF 4. Flare/Relief Valve 08:25 08:55 o Hrs 30 Mins 0 0 0 387 MSCF TOTAL VOLUME 14,704 MSCF First Determination of Cause: 1. MI # 1 Shutdown SESD low seal oil DP. Meter 618 2. Lost both MI compressors Meter 660 3. MI # 2 Shutdown on gear compressor high vibration. Meter 618 4. MI # 1 Shutdown BESD low seal oil DP. Meter 618 Action Taken to Stop Flaring: 1. Blow down completed 2. Restarted MI compressors 3. Blowdown completed. 4. Slowdown completed. Wednesday, September 25,2002 Page 1 of 1 REPORT NO: 02-0659 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 20 Sep 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 04:30 04:45 OHrs 15 Mins 0 0 ~ 255 MSCF 06:50 07:20 OHrs 30 Mins 0 0 ~ 255 MSCF TOTAL VOLUME 510 MSCF First Determination of Cause: 1. T /C 1802 BESD. Meter 618 Shutdown for maint. PSV Repair 2. T/C 1801 SESD. Meter 618 Shutdown for maint. Depressured to repair P-72CSV Stem seal leak. Action Taken to Stop Flaring: 1. Slowdown Completed. 2. Slowdown Completed. Wednesday, September 25,2002 Page 1 of 1 REPORT NO: 02-0666 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 23 Sep 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 16:50 17:35 0 Hrs 45Mins Black Intermittent Smoke o 0 Planned VOLUME ~ 1,062 MSCF TOTAL VOLUME 1,062 MSCF First Determination of Cause: 1. 1802 at CCP needed to be SD for repair of a leak. Action Taken to Stop Flaring: 1. CCP repaired leak and brought 1802 back on line. Wednesday, September 25,2002 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 10/2002 CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 2,483,858 2. Reinjected 11,038,078 3. Flared or vented less than 1 hour. 6,755 4. Flared or vented greater than 1 hour 4,080 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 29,580 6. U$ed for lease operations Fuel 3,247,879 Assist 60,022 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 16,870,252 8. NGL gas equivalent produced 2,483,858 9. Purchased gas 0 10. Transferred from: CCP 18,353,985 11. Transferred to: FS1, FS2, FS3 1,483,733 Remarks: I hereby ceo.0;t ~ foregoing is true and correct to the best of my knowledge. Signature: . . J A MY\. p' ¿ Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety 4¡oVQ MCF:J3A- 2. Lease Use MCF 3. Conserv. Purposes MCF (~~~ Commiss ner l r4t?>f~r Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperaturè of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. SP EXPLORATION (ALASKA) INC. PRUDHOE SAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT October 2002 Page 1 'Unplanned Events less than or equal to 1 hour DATE 'TIME VOLUME DESCIUPTlON,OF.JNCIDENT8CCÄUSe 10/2/2002 1328-1339 16 Not required lor unplanned events which 10/6/2002 1325·1355 23 are less than or equal to 1 hour 10/17/2002 1410-1420 387 10/17/2002 1412·1418 126 10/19/2002 1750·1800 328 10/20/2002 1448-1503 387 10/20/2002 1449·1454 45 10/25/2002 2355-2400 387 10/26/2002 0133-0137 49 10/26/2002 0217-0225 132 10/26/2002 0230-0320 350 10/26/2002 0310-0314 65 10/26/2002 1003-1006 35 10/26/2002 1031-1041 387 1 0/26/2002 1031-1 039 134 10/26/2002 1423-1441 483 10/26/2002 1424-1434 387 10/30/2002 1222-1226 35 10/30/2002 0608-0620 2,800 TOTAL 6,556 ACTION TAKEN TO ELIMINATE CAUSE See attachments 'Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIPENT" CAUSE 10/1212002 1545-1700 2,720 See attachments 10/25/2002 1755-1920 1,360 TOTAL 4,080 ¡Planned Events Less Than or Equal 1 Hour AND Not Exceedin", 5000 Mct DATE TIME VOLUME DESCRIPTION Of INCIDENT" CAUSE 1 0/15/2002 0249-0256 4 See attachments 10/19/2002 0746-0801 195 ACTION TAKEN TO ELIMINATE CAUSE Not required lor unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments TOTAL 199 ACTION TAKEN TO ELIMINATE CAUSE See attachments ¡Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcl DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour 4,080 Planned Events < 1 hour and not 199 exceeding 5,000 MCF Planned Events> 1 hour or ° exceeding 5,000 MCF Pilot Purge Assist 11/7/2002 TOTAL FLARED VOLUME 100,437 3:14PM REPORT NO: 02-0718 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 12 Oct 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 15:45 17:00 1 Hrs 15 Mins Black Intermittent Smoke o 0 Planned VOLUME o 2,720 MSCF TOTAL VOLUME 2,720 MSCF First Determination of Cause: 1. L TS 3 gas to liquid exchanger failed with a crack to the atmosphere. Deinventoried the L TS III tower bottoms liquid and the Gas to Liquid Exchanger to the burn pit disposal. Resulting in black smoke. Black smoke report sent in by the CGF OTL. Action Taken to Stop Flaring: 1. Blew L TS3 down to 150 psi. Closed flare valve to keep some pressure to finish the liquid deinventory. Isolated the liqiud drains when the deinventory was completed on L TS III and the Gas to Liquid Exchanger. Friday, October 25,2002 Page 1 of 1 bp REPORT NO: 02-0722 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 15 Oct 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 02:49 02:56 0 Hrs 7 Mins Black Intermittent Smoke Planned o 0 ~ VOLUME 4 MSCF 4 MSCF TOTAL VOLUME First Determination of Cause: 1. MTR#664""Depressured L TS#3 after Nitrogen purge"Flared off of P-203 IC to keep the flare lit while depressuring. Action Taken to Stop Flaring: 1. Closed P-2031C when depressure of L TS#3 was completed. Friday, October 25,2002 Page 1 of 1 bp REPORT NO: 02-0729 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 19 Oct 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 07:46 08:01 OHrs 15 Mins 0 0 ~ 195 MSCF 17:50 18:00 OHrs 10 Mins 0 0 0 328 MSCF TOTAL VOLUME 523 MSCF First Determination of Cause: 1. Shutdown T/C 1802 Booster # 2 To repair oil leak on gas turbine. Meter # 618 2. MI # 1 T/C 1805 Shutdown on high vibration gas turbine. Meter # 618 Action Taken to Stop Flaring: 1. Blow down completed. 2. Blow down complete. Friday, October 25, 2002 Page 1 of 1 bp REPORT NO: 02-0740 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 25 Oct 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 17:55 19:20 1 Hrs 25 Mins 2. Controlled Blowdow 23:55 24:00 0 Hrs 5 Mins Black Intermittent Smoke Planned VOLUME 0 0 0 1 ,360 MSCF 0 0 0 387 MSCF TOTAL VOLUME 1,747 MSCF First Determination of Cause: 1. L TS 3 BESD from 300psi. Leaking flanges found during pressure up of L TS 3 train. 2. 1805 MI compressor SD due to undetermined instrumenation problem. Action Taken to Stop Flaring: 1. Had to depressure L TS 3 train to 0 for gasket replacement on two flanges. 2. Compressor depressured, adjusted L TS temps to stay out of flare. Monday, October 28, 2002 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 11/2002 CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 2,383,778 2. Reinjected 10,682,871 3. Flared or vented less than 1 hour. 3,642 4. Flared or vented greater than 1 hour 44,778 / (Supplemental report required - See 20 AAC 25.235) V 5. Pilot and Purge 28,652 6. Used for lease operations Fuel 3,065,479 Assist 65,385 7. Other Lift Gas, Off Field 0 TOTAL items 1 . 7 16,274,585 8. NGL gas equivalent produced 2,383,778 9. Purchased gas 0 10. Transferred from: CCP 17,829,514 11. Transferred to: FS1, FS2. FS3 1,554,929 Remarks: I hereby ce~ the fOr~g is true and correct to the best of my knowledge. Signature: ..M..V" ^ .-. Title: SUrCn'/I.()R ~. o-.....~\... ~ Form 10-422 (ReviseU/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety 44(778) MCFJ.ß¡a--- 2. Lease Use MCF 3. Conserv. Purposes MCF ~:~i~··~ /aí r /0 ð-- Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT November 2002 11/3/2002 11/3/2002 11/3/2002 11/4/2002 11/4/2002 11/5/2002 11/6/2002 11/7/2002 11/1 0/2002 11/11/2002 11/16/2002 11/16/2002 11/17/2002 11/23/2002 11/28/2002 1952-1954 1957-2012 2313-2318 0925-0945 1000-1010 1455-1535 0010-0025 0933-1015 1440-1455 1502-1509 1127-1137 1136-1146 0729-0732 1635-1650 0045·0100 TOTAL 5 are less than or equal to 1 hour are less than or equal to 1 hour ~. V./ O. ~,\~'veú-~¡>'~ {fff5- Rø7~'Ì¡- .,.. , c¡þ. . I J.t ~~\ ·t4~':5 328 ..- \eL-.:):J Jr ( <7{~ 387 . 'T{e, It0"5 ~~ ~~-jrzJ,}Q . . C...-:tt! ~Df" J Ik..,.\ (:87)-- ~j \-I 11\:5-1' i {-It!.!' (..",.....,.. a C' *'"v}w02.... 1 µ.t7~ t4?!J}.J;f .J~Y~- rz.{z.lJ·v Page 1 Unplanned Events reater than 1 hour DAlTE 11/2/2002 11/4/2002 11/5/2002 11/6/2002 11/7/2002 11/9/2002 11/10/2002 11/16/2002 11/18/2002 11/23/2002 11/24/2002 11/28/2002 "riME'.' 1957-2228 0924-2400 0000-2400 0000-1500 0757-1100 2230-2400 0000-0120 1130-1330 0416-0520 1635-1752 1753-1857 0045-0245 TOTAL VO"!.!MEt«i'OE¡¡çB'!'irI9N.oF''IN~!DEN1"fli\~A!.!. .E«AÇTI9NTAKENToELIM!NATE~A!.!$E ~:~~~ ~~:r~~:~~~,~ntsc,lw.'~ I(I~~~~' See attachments /1,754 Intermittent . D ¡/3,97B"ntermittent fJ .\,+ < It¿>;; / «I54~ermittent !,:v, t · !vi"" jI';72õ Intermitten. ìk t# h;£;~ ,¡1,000 Intermittent I .ll~.;...-: --:? 015,760 '-f'Si"Î~lo =-- .h ..Ii ,900 Intermitter)t...,-;O . ~5 :J\ýøt::t" /5,287._ ~ I ¡ c,. ,,, '. ..I.n .SI...Jie¡- /57 .' t' ,ì1;Ú C~ ~ J........ ,,1'7,205 -¡JI.}Þt~\>· ~'O '" "--'- 44,778r 2(x.);¿. J(~ Q.-'t,~) ~ 47 t '3 'do ;-tc.r TOTAL ~195 1'7{"t7(~~ Planned Events Exceedin 1 Hour OR Exceedin 5000 Met TOTAL Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME o '2-46 ;"7,:5'ÒO 195 142.457 V' 12/18/2002 1 0:59 AM REPORT NO: 02-0760 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 02 Nav 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 19:57 22:28 2 Hrs 31 Mins Black Intermittent Smoke o 0 Planned VOLUME o 9,998 MSCF TOTAL VOLUME 9,998 MSCF First Determination of Cause: 1. MI #1 shut down due to lose CDP cable. Machine lost signal. Flared off Meter 660. Action Taken to Stop Flaring: 1. Chilers and L TS's were warmed up. CDP cable was tightened and machine restarted. Tuesday, November 26, 2002 Page 1 of 1 bp REPORT NO: 02-0769 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 04 Nav 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 09:25 24:00 14 Hrs 35 Mins ~ 0 0 4,665 MSCF 2. Flare/Relief Valve 09:25 09:45 OHrs 20 Mins ~ 0 0 774 MSCF 3. Flare/Relief Valve 10:00 10:10 OHrs 10 Mins ~ 0 0 27 MSCF TOTAL VOLUME 5,466 MSCF First Determination of Cause: ~ i 1'1"~:~~:~~~/~~:n~,ds~t~~~~hf~e;~~I~~a~~Uc~~~~i~~t:~~~~~:; 6~~~ble to sustain stable ~ I' ! 2. thutdown both MI trains due to unstable operations caused by reduced rates. Depressured both ,/trains to perform maintenance. Volume indicated by meter 618. \.....,.../3. Depresured section of pipe to repair valve leak. Volume indicated by meter 618. Action Taken to Stop Flaring: 1. Adjusted facility with reduced rates waiting repairs on TAPS. 2. MI trains depressured 3. Pipe depressured. Tuesday, November 26, 2002 Page 1 of 1 REPORT NO: 02-0771 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 05 Nov 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 00:00 24:00 24 Hrs OMins ~ 0 0 1,754 MSCF 14:55 15:35 OHrs 40 Mins 0 ~ 0 27 MSCF TOTAL VOLUME 1,781 MSCF , ~ First Determination of Cause: ~K " 1. CGF plant upset due to earthquake striking ALPS pipeline. Volume indicated by meter 660. ~~ U. 4957 Portatest separators vent to the bum pit disposal was found to be leaking through causing black smoke at the bum pit. Volume indicated by meter 618. Action Taken to Stop Flaring: 1. Intermittemt. Awaiting repairs on taps. Adjusted facility as required. 2. Added assist gas to the bum pit disposal to mitigate the black smoke. Local operator got the valve full closed. The smoke and flame dissapated. When no more smoke was evident assist gas was closed. Tuesday,November26,2002 Page 1 of 1 bp REPORT NO: 02-0774 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 06 Nav 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 00:00 15:00 15 Hrs OMins ~ 0 0 3,978 MSCF 00:10 00:25 OHrs 15 Mins ~ 0 0 200 MSCF TOTAL VOLUME 4,178 MSCF First Determination of Cause: 1. Unstable rates to due TAPS shutdown caused by earthquake. Volume indicated by meter 660. 2. Partially depressured 4938 inlet separator for battery limit valve integrity checks. Volume indicated by meter 618. Action Taken to Stop Flaring: 1. Adjust facility with reduced rates waiting on TAPS repair. 2. Testing completed and closed flare valve. Tuesday,November26,2002 Page 1 of 1 ~, ~,:¡) { ~#' .} )<9 );í8J>! ,V REPORT NO: 02-0781 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 07 Nov 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 07:57 11:00 3Hrs 3Mins ~ 0 0 454 MSCF 09:33 10:15 OHrs 42 Mins ~ 0 0 144 MSCF TOTAL VOLUME 598 MSCF First Determination of Cause: 1.,During the restart of lTS 3 and the loading of MI1855 the compressor shutdown thus flaring off the ~tabilizer overhead. Length of time due to the compressor shutting down on HH suction drum level two times. iMeter. 660 L,,2. 1855 Mi compressor shutdown on HH suction drum level while loading. This happened two times. Meter: 618 Action Taken to Stop Flaring: 1. Started and loaded 1855 MI compressor. 2. Started and loaded 1855 MI Compressor. Tuesday, November 26, 2002 Page 1 of 1 REPORT NO: 02-0791 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 09 Nov 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 22:30 24:00 1 Hrs 30 Mins Black Intermittent Smoke ~ 0 Planned VOLUME o 1,720 MSCF TOTAL VOLUME 1,720 MSCF First Determination of Cause: 1. L TS-3 Gas to Gas exchanger leak. Blew L TS-3 train down. Volume indicated by meter 618. Action Taken to Stop Flaring: 1. Blowdown complete. Tuesday, November 26, 2002 Page 1 of 1 REPORT NO: 02-0792 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 10 Nov 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 00:00 01 :20 1 Hrs 20 Mins Black Intermittent Smoke ~ 0 Planned VOLUME o 1,000 MSCF TOTAL VOLUME 1,000 MSCF First Determination of Cause: 1. L TS-3 Gas to Gas exchanger leak. Blew L TS-3 train down. Volume indicated by meter 618. Action Taken to Stop Flaring: 1. Blowdown complete. Tuesday, November 26. 2002 Page 1 of 1 REPORT NO: 02-0813 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 16 Nov 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 11:27 11:37 OHrs 10 Mins 0 0 0 328 MSCF 2. Flare/Relief Valve 11:30 13:30 2Hrs OMins 0 0 0 6,760 MSCF 3. Flare/Relief Valve 11:36 11:46 OHrs 10Mins 0 0 0 387 MSCF TOTAL VOLUME 7,475 MSCF First Determination of Cause: It." 0\.M, I -1805 trip. Plant upset due to PSM testing. Mtr.-#618 ~I (¡Unit to 180# ~ I'.'~" '.,~ .:f1... ,'. 'l;!' 2..... .þlant upset during PSM testing - Loss of feed to MI Compressors caused trips on both units flare off ~ ¡-J..A ¡Stabilizer Overhead Mtr.-#660 ~qv..) ¡ ~' .' MI-1855 trip. Plant upset due to PSM testing. Mtr.-#618 ~'? Unit to 0# Action Taken to Stop Flaring: 1. Unit depressured 2. Feed rate cut, Stabilized plant, restarted MI comporessors 3. Unit depressured Tuesday, November 26, 2002 Page 1 of 1 REPORT NO: 02-0820 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 18 Nov 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 04:16 05:20 1 Hrs 4Mins Black Intermittent Smoke ~ 0 Planned VOLUME o 1,900 MSCF TOTAL VOLUME 1,900 MSCF First Determination of Cause: 1. 4957 P72ASV Lifted prematurely. Action Taken to Stop Flaring: 1. Found leaking PSV and blocked it in. Tuesday,November26,2002 Page 1 of 1 REPORT NO: 02-0825 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 23 Nov 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 16:35 16:50 OHrs 15 Mins 0 0 0 328 MSCF 16:35 17:52 1 Hrs 17 Mins 0 0 0 5,287 MSCF TOTAL VOLUME 5,615 MSCF \, \\I. Q~>'¡ 'Ç''tt First Determination of Cause: 1.\T/C 1805 MI # 1 Shutdown on CoolStop I Recycle Trip Compressor Blew Down to 180 PSI. .Meter # 618 T/C 1805 MI # 1 Shutdown on CoolStop / Recycle Trip Meter # 664 Action Taken to Stop Flaring: 1. Slowdown Completed. 2. Warmed up l TS 1 & 2: Restarted Turbine Tuesday, November 26, 2002 Page 1 of 1 bp REPORT NO: 02-0829 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 24 Nov 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 17:53 18:57 1 Hrs 4 Mins o 0 TOTAL VOLUME o Black Intermittent Smoke First Determination of Cause: 1. Flared for CCP when 1805 ow stage shutdown for ai/leak. M664. Action Taken to Stop Flaring: 1. EOC cut gas in the field and CCP effected repairs. Tuesday,November26,2002 Planned VOLUME 57 MSCF 57 MSCF Page 1 of 1 REPORT NO: 02-0834 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 28 Nav 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 00:45 01:00 OHrs 15 Mins 0 0 0 387 MSCF 00:45 02:45 2Hrs OMins 0 0 0 7,205 MSCF TOTAL VOLUME 7,592 MSCF First Determination of Cause: 1\MI #1 Trip (Mtr.#618) I, , ",\)t ~^.'~ ,v... ~ <!\.' <l;\:J tr \ 2. fMi #1 SO on recycle trip - probably faulty COP xmitr. , \j Flare off Stab over head (Mtr #660) Action Taken to Stop Flaring: 1. Unit depressured 2. Maximized MI #2, warmed L TS's and chillers. Inst tech replacing COP transmitter. Restart MI #1 after repair. Monday,December02,2002 Page 1 of 1 FACILITY: CGF SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0837 BPXA FLARE REPORT PRUDHOE BAY DATE: 29 Nov 2002 TIME OF FLARING Start Stop Duration 08: 1 0 08:24 0 Hrs 14 Mins First Determination of Cause: 1. SD T/C 1802 TO FIX GAS LEAK Action Taken to Stop Flaring: 1. BLOW DOWN COMPLETED Monday, December 02, 2002 Black Intermittent Smoke o 0 Planned TOTAL VOLUME ~ VOLUME 195 MSCF 195 MSCF Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 12/2002 CENTRAL GAS FACILITY Disposition Volume MCF" 1. Sold 2,939,659 2. Reinjected 12,000,905 3. Flared or vented less than 1 hour. 5,066 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 29,972 6. Used for lease operations Fuel 3,479,051 Assist 35,443 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 18,490,096 8. NGL gas equivalent produced 2,939,659 9. Purchased gas 0 10. Transferred from: CCP 20,207,701 11. Transferred to: FS1, FS2, FS3 1,717,605 Remarks: I hereby cem..a~he fore~rt:g is true and correct to the best of my knowledge. Signature: AI, - I. Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1 . Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - CENTRAL GAS FACILITY GAS FLARING INCIDENT REPORT December 2002 Page 1 tunplanned Events less than or equal to 1 hour . DATE. .' TIME VOLUME. . . DESCRIPTION OF INCIDENT & CAUSE.' . .", '.'"'' -,-,,,. ._"." '.-,., ,-.'". ,-"" -,,,,. ._,-., ',.. "" '. 12/7/2002 1820-1830 58 Not required for unplanned events which 12/13/2002 1035-1052 4,207 are less than or equal to 1 hour 12/21/2002 0530-0545 387 12/21/2002 1605-1610 1 12/25/2002 1354-1405 400 TOTAL 5,053 , '. ACTION TAKEN TO ELIMINATE CAUSE' Not required for unplanned events which are less than or equal to 1 hour See attachments TOTAL o rPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE . TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 12/21/2002 0520-0530 13 See attachments TOTAL 13 ~Planned Events Exceedin~ 1 Hour OR Exceeding 5000 Mcf DATE TIME .' VOLUME· DEsCRIPTION or: INCIQENT & ÇAUSE See attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME o 13 o 70,481 See attachments . ACTION T~KEN TO ELIMINATE CAUSE . See attachments ACTION TAKEN TO ELIMINATE CAUSE . See attachments 1/1 0/2003 3:26 PM REPORT NO: 02-0883 BPXA FLARE REPORT PRUDHOE BAY FACILITY: CGF DATE: 21 Dee 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 05:20 05:30 OHrs 10 Mins 0 0 ~ 13 MSCF 2. Flare/Relief Valve 05:30 05:45 OHrs 15 Mins 0 0 0 387 MSCF 3. Flare/Relief Valve 16:05 16:10 OHrs 5Mins 0 0 0 1 MSCF TOTAL VOLUME 401 MSCF First Determination of Cause: 1. Shutdown MI #2 T /C 1855 to replace Sheared bolts on cooling rim adapter. Meter # 660 2. Ml #2 T/C 1855 BESD Meter # 618 3. Restarted MI # 2 T/C 1855 Meter # 660 Action Taken to Stop Flaring: 1. Fully loaded MI # 1 T/C 1805 Adjusted Process. 2. Blow Down Completed. 3. Fully loaded MI # 2 Balanced MI Loads Thursday, December 26, 2002 Page 1 of 1