Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU FS 1 / BP Exploration STATE OF ALASKA AOGCC GAS DISPOSITION FILES YEAR: 2002 FACILITY: PBU FS 1 OPERATOR: BP EXPLORATION (ALASKA) INC Facility FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 01/2002 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 3,279 4. Flared or vented greater than 1 hour 4,121 vtI"" (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 37,528 .,/ 6. Used for lease operations Fuel 664,144 Assist 68 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 709,140 -. 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 313,499 11. Transferred to: CCP 71,926,087 Remarks: I hereby certr;;h~;h~Oing is true and correct to the best of my knowledge. Signature: .' . AI Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use L.j J ,)/1 MCF 3. Conserv. Purposes MCF L~NuU'~ Commissi er. ?5/s:/ö)-- Date 2- Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT JANUARY, 2002 Page 1 ~UnPlanned Events less than or equal to 1 hour DATE ··TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE . 1/14/2002 0946-0950 176 Not required for unplanned events which are less than or equal to 1 hour TOTAL 176 . . ACTION TAKEN TO ELlII/IINATECAUSE··· . Not required for unplanned events which are less than or equal to 1 hour IUnplanned Events greater than 1 hour DATE . T!ME VOLUME DESCRIPTION OF INCIDENT & CAUSE . See attachments ACTION TAKEN TO ELIMINATE CAUSE .. See attachments TOTAL o Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct 1/12/2002 1/15/2002 1/15/2002 1/16/2002 1/18/2002 1/20/2002 1/23/2002 1/23/2002 1/24/2002 1/24/2002 0900-0905 0145-0220 0200-0205 2300-2400 0001-0010 1740-1750 0001-0010 2106-2110 1405-1420 2128-2147 TOTAL 3 See attachments 65 60 2,238 60 446 60 33 78 60 3,103 See attachments Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct ··DATETIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 1/17/2002 0001-0200 4,121 See attachments TOTAL 4,121 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour & not exceeding 5,000 MCF Planned Events> 1 hour and exceeding 5,000 MCF Pilot Purge Assist AcTION TAKEN TO ELIMINATE CAUSE See attachments 176 o 3,103 4,121 TOTAL FLARED VOLUME REPORT NO: 02-0020 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 12 Jan 2002 TIME OF FLARING Black .._.._~SY.5IEM .._.._..mStart.Stopmm.__Duratio~ m~lntermittent_Smoke..~lannedm.mm\lOLUME_ 1. Flare/Relief Valve 09:00 09:05 0 Hrs 5 Mins D D ~ 3 MSCF TOTAL VOLUME 3 MSCF First Determination of Cause: J 1. Swapped gas loads from 1802 T /C to 1801 T /C For maint. Action Taken to Stop Flaring: 1. Loaded 1801 T/C Friday, February 01, 2002 Page 1 of 1 REPORT NO: 02-0022 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 15 Jan 2002 TIME OF FLARING Black .....mm.mSYSTEM.... __StartSlop.._m..Duration._ mlntermittent.,Smoke.......PJanned..mm.\lOLUM E_ 1. Flare/Relief Valve 01 :45 02:20 0 Hrs 35Mins D D ~ 65 MSCF 2. Flare/Relief Valve 02:00 02:05 0 Hrs 5Mins D D ~ 60 MSCF TOTAL VOLUME 125 MSCF First Determination of Cause: 1. Depressured Commonline 5-0 for maintenance. J 2. Shutdown 1803 Turbine/Compressor for scheduled maintenace. Action Taken to Stop Flaring: 1. None necessary. 2. None necessary. Flaring stopped when T/C depressured. Thursday, January 31,2002 Page 1 of 1 REPORT NO: 02-0072 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 16 Jan 2002 TIME OF FLARING Black mmmSY.5IEMm.mm..m....mStart_Stop.",.Durationmmm ....lntermittenL...Smoke 1. Controlled Blowdow 23:00 24:00 1 Hrs 0 Mins D D ~Jannedm.m..V_OLUM E ~ 2,238 MSCF TOTAL VOLUME 2,238 MSCF First Determination of Cause: ./ 1. Depressured Commonlines 1 B, 1 C, and 10 for divert valve replacements at the Drill Site. Action Taken to Stop Flaring: 1. Depressuring completed. Thursday, January 31, 2002 Page 1 of 1 REPORT NO: 02-0029 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 17 Jan 2002 TIME OF FLARING Black ..,m......_SYSIEMmm.._StartmStop_--.DllratiOn mmmmlntermittenL...Smoke._PJanned"VOLUME 1. Flare/Relief Valve 00:01 02:00 1 Hrs 59Mins D D ~ 4,121 MSCF TOTAL VOLUME 4,121 MSCF First Determination of Cause: J 1. Continue depressuring DS1 fo rdivert valve changeout from previous day. Action Taken to Stop Flaring: 1. Completed flaring. Thursday, January 31, 2002 Page 1 of 1 REPORT NO: 02-0074 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 18 Jan 2002 TIME OF FLARING Black ..mm..,_,SYSIEM~..mmmStart,Slop,.__Duration", mJntermittentmm'Smoke......PJannedm..mmVOLUM E 1. Flare/Relief Valve 00:01 00: 10 0 Hrs 9 Mins D D ~ 60 MSCF TOTAL VOLUME 60 MSCF First Determination of Cause: 1. Normal stop 1804. Action Taken to Stop Flaring: 1. Flaring completed. Thursday, January 31, 2002 Page 1 of 1 REPORT NO: 02-0075 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 20 Jan 2002 TIME OF FLARING Black m.m,--SYSIEM,_.mmm....mmStarLStop....m.Dur.atlon.____..lnterJIlittent..mSmOke_mmPJanned__VOLUME, 1. Flare/Relief Valve 17:40 17:50 0 Hrs 10 Mins D D ~ 446 MSCF TOTAL VOLUME 446 MSCF First Determination of Cause: 1. Normal stop 1804 for maintenance. Action Taken to Stop Flaring: 1. Completed flaring. Thursday, January 31,2002 Page 1 of 1 REPORT NO: 02-0039 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 23 Jan 2002 TIME OF FLARING Black ...,mm...5YST£M..mm ....,StartSlop,.,Duration..._.JntermittentSmoke_.Planned..mm VOLUMEmm 1. Flare/Relief Valve 00:01 00:10 0 Hrs 9Mins D D ~ 60 MSCF 2. Flare/Relief Valve 21 :06 21 :10 0 Hrs 4Mins D D ~ 33 MSCF TOTAL VOLUME 93 MSCF First Determination of Cause: J 1. Normal stop 1804 for maintenance. 2. Depressured 1804 Turbine/Compressor case for maintenance. Action Taken to Stop Flaring: 1. Completed flaring. 2. No action necessary. Thursday, January 31, 2002 Page 1 of 1 REPORT NO: 02-0042 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 24 Jan 2002 TIME OF FLARING Black m_SYSIEM_m__,_.Start,Slop,mmmmmDur.ation.m. .. Intermittent.mmSmokL__PJannedm . VOLUME. 1. Controlled Blowdow 14:05 14:20 0 H rs 15 Mins D D ~ 78 MSCF 2. Controlled Blowdow 21 :28 21 :47 0 Hrs 19 Mins D D ~ 60 MSCF TOTAL VOLUME 138 MSCF First Determination of Cause: 1. LPS 1804 T/C DEPRESSURED FOR TURBINE OVERHAUL WORK. J 2. Depressured 1804 Fuel Gas filters to flare for Turbine Overhaul. Action Taken to Stop Flaring: 1. COMPRESSOR CASE DEPRESSURING COMPLETED. 2. Fuel filters depressuring completed. Thursday, January 31, 2002 Page 1 of 1 Facility FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 02/2002 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 11,096 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 35,143 6. Used for lease operations Fuel 704,192 Assist 138 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 750,569 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 287,294 11. Transferred to: CCP 74,370,365 Remarks: I hereby cer¿ t,'ðthtoregOing ~~ true and correct to the best of my knowledge. Signature: , . ....I. ^. ~.I I. Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Page 1 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT FEBRUARY, 2002 Iunplanned Events less than or equal to 1 hour DATE TIME . . . . VOLUME DESCRIPTION OF INCIDENT" CAU$E .... .. 2/1/2002 1340-1400 1,100 Not required for unplanned events which 2/2/2002 2210-2215 40 are less than or equal to 1 hour 2/2/2002 2245-2250 40 2/4/2002 1115-1200 2,470 2/27/2002 1715-1748 7,386 TOTAL 11,036 J ACTION T~KEN TOELlMINATi;CAUSE> . Not required for unplanned events which are less than or equal to 1 hour See attachments See attachments TOTAL o ~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE· .... . TIME ··VOLIJME>[)i;$ÇfU~TIOf\lOf'INCIDENT" CAUSE 2/14/2002 0045-0048 60 See attachments .. ... ..ACTIONJ'AKENT()EUMINATE(;:AU$E· See attachments TOTAL 60 Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE·. ............ TIME · . . .......... VOLUME ........ DESCRIPTION OFINÇIPENT&CAU$E· . See attachments TOTAL 0 ACTIPNTAIŒN TO ELIMINATE CAUSE·. . See attachments .1 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist o 60 o TOTAL FLARED VOLUME 46,377 REPORT NO: 02-0105 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 14 Feb 2002 TIME OF FLARING Black SYSTEM Start Stop Durati~..Jntermittent Smoke Planned VOLUME... 1. Flare/Relief Valve 00:45 00:48 OHrs 3Mins D 0 ~ 60 MSCF TOTAL VOLUME 60 MSCF First Determination of Cause: 1. Shut down T/C 1803 for upcoming Water Wash. Action Taken to Stop Flaring: 1. T/C depressuring completed. Tuesday, February 26, 2002 Page 1 of 1 Facility FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 03/2002 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 15 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 41,072 6. Used for lease operations Fuel 802,560 Assist 659 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 844,306 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 313,033 11. Transferred to: CCP 80,025,248 Remarks: I hereby cef¿ ~l$ th~OregOingl~jtrue and correct to the best of my knowledge. Signature: .. J. A I\^I\J. ø. Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT MARCH, 2002 Page 1 lunplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour TOTAL o See attachments See attachments TOTAL o Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE 3/16/2002 1430-1440 3 See attachments 3/18/2002 1515-1517 3 3/18/2002 1733-1735 3 3/24/2002 0400-0405 3 3/25/2002 0900-0905 3 ACTION TAKEN TO ELIMINATE CAUSE See attachments TOTAL 15 Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME· VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist o o 15 o TOTAL FLARED VOLUME 41,746 bp FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0148 BPXA FLARE REPORT PRUDHOE BAY DATE: 16 Mar 2002 TIME OF FLARING Start Stop Duration 14:30 14:40 0 Hrs 10 Mins Black Intermittent Smoke Planned ~ D 0 TOTAL VOLUME First Determination of Cause: 1. Normal stopped 1801 Compressor after test run. 4000 hr. inspection completed. Action Taken to Stop Flaring: 1. Flaring completed. Thursday, March 28, 2002 VOLUME 3 MSCF 3 MSCF Page 1 of 1 bp REPORT NO: 02-0154 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 18 Mar 2002 SYSTEM 1. Controlled Blowdow 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 15:15 15:17 OHrs 2Mins D D ~ 3 MSCF 17:33 17:35 OHrs 2Mins 0 D ~ 3 MSCF TOTAL VOLUME 6 MSCF First Determination of Cause: 1. Normal stop on TC/1801 2. Normal stop on TC/1801 Action Taken to Stop Flaring: 1. Normal blow down to depressure case. 2. Normal blowdown to depressure case. Thursday, March 28,2002 Page 1 of 1 bp REPORT NO: 02-0173 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 24 Mar 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 04:00 04:05 0 Hrs 5 Mins First Determination of Cause: 1. SHUTDOWN FOR MAINTENANCE Action Taken to Stop Flaring: 1. DEPRESSURING COMPLETED Thursday, March 28, 2002 Black Intermittent Smoke D D Planned TOTAL VOLUME ~ VOLUME 3 MSCF 3 MSCF Page 1 of 1 bp REPORT NO: 02-0174 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 25 Mar 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 09:00 09:05 0 Hrs 5Mins Black Intermittent Smoke D D TOTAL VOLUME ~ First Determination of Cause: 1. SWAPPING LM1500 STV/IP COMPRESSORS. Action Taken to Stop Flaring: 1. PUT T /C- 1802 ON LINE AND SHUT DOWN T /C-1801. Thursday, March 28, 2002 Planned VOLUME 3 MSCF 3 MSCF Page 1 of 1 FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 04/2002 Facility Disposition Volume MCF" "Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour. o ,,/ 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 5,444 5. Pilot and Purge 39,826 6. Used for lease operations Fuel Assist 742,486 o 7. Other Lift Gas, Off Field o TOTAL items 1 - 7 787,756 v/ 1. Safety 5,444 MCF JBR.... 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas o 3. Conserv. Purposes MCF 10. Transferred from: CGF 294,746 tol,()/c)~ Date 11. Transferred to: CCP 71,350,761 Remarks: Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Signature: Form 10-422 (Revised 4/95) Title: SUPERVISOR BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT April 2002 lunPlanned Events less than or equal to 1 hour DATE ... TIMEYOL.IJMEDE$CRIPTIONOFINCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour Page 1 TOTAL o lunplanned Events greater than 1 hour DATE TIME YOLUMEDE$C~IPrIO~ Of INCIDENT & CAIJSE See attachments TOTAL o Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME . ... VOLUMEO:ESCRIPrIO~OF INCIDENT & CAUSE See attachments TOTAL o Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf 4/4/2002 4/19/2002 0535-0710 0045-0600 174 See attachments 5,270 TOTAL 5,444 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME o o o 5,444 45,270 . .·ACTlONTAKEN TO EUMINATE CAUSE .. ......",.",.",.",.",.,.,,,,.,,,.,,,.,,..,,..,,,.,,,..,,..,..,,..".."..".."..".,.,." ",,,,.,,..,,.,,...,,,.....,,....,,.,,..,,..,,..,,, ."."'.",."...,'".,,,. Not required for unplanned events which are less than or equal to 1 hour ........ ACrlON rAKE~ TO ELIMINATE CAUSE See attachments ··ACTION TAKEN TO EI.,;IMINATE CAUSE See attachments FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0202 BPXA FLARE REPORT PRUDHOE BAY DATE: 04 Apr 2002 TIME OF FLARING Start Stop Duration 05:35 07:10 1 Hrs 35Mins Black Intermittent Smoke Planned D D ~ TOTAL VOLUME First Determination of Cause: 1. Depressured commonlines from Drill Site 5 in preparation for Drill Site 5 shutdown work. Action Taken to Stop Flaring: 1. Completed de-pressuring commonlines. Tuesday, April 30, 2002 VOLUME 174 MSCF 174 MSCF Page 1 of 1 REPORT NO: 02-0236 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 19 Apr 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 00:45 06:00 5 Hrs 15 Mins Black Intermittent Smoke D D Planned VOLUME ~ 5,270 MSCF TOTAL VOLUME 5,270 MSCF First Determination of Cause: 1. Flared to depressure commonlines B,D,C and E from Drill Site #2 for valves changeout. Action Taken to Stop Flaring: 1. Completed depressuring B,D,C and E to flare. Closed off to flare. Tuesday,ApriI30,2002 Page 1 of 1 Facility FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 185 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 42,306 6. Used for lease operations Fuel 734,593 Assist 69 7. Other Lift Gas, Off Field 0 TOTAL items 1 . 7 777,153 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 286,688 11. Transferred to: CCP 71,765,989 Remarks: I hereby ce/) that the I\regoing is uue and correct to the best of my knowledge. Signature: 0.1 Å J... NIA! 1 J Title: SUPERVISOR Form 10-422 (Revised 4/95) onth/Year of Disposition OS/2002 "Indicate contribution of each pool to total. , Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT May 2002 Page 1 IUnplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION\OFINCIDENTT&TCAUSE 5/15/2002 1710-1715 30 Not required for unplanned events which 5/15/2002 1720-1725 30 are less than or equal to 1 hour 5/15/2002 1735-1740 30 5/15/2002 1750-1755 30 TOTAL 120 lunPlanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL o Planned Events Less Than or E ual1 Hour AND Not Exceedin 5000 Mcf DATE TIME VOLUME DESCRIPTION\OFINCIDENT&CAUSE 5/1/2002 1335-1340 3 See attachments 5/13/2002 1315-1335 53 5/15/2002 1455-1500 3 5/15/2002 2100-2105 3 5/31/2002 0945-0950 3 TOTAL 65 Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTIONOFINCIDENT&CAUSE See attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 120 o 65 o 42,560 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments 6/6/2002 12:59 PM bp REPORT NO: 02-0273 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 01 May 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 13:35 13:40 0 Hrs 5 Mins Black Intermittent Smoke D D TOTAL VOLUME First Determination of Cause: 1. SWAPPED LM1500 COMPRESSORS Action Taken to Stop Flaring: 1. PUT 1801-T/C ON LINE AND SHUT DOWN T/C-1802 Tuesday, May 28, 2002 Planned ~ VOLUME 3 MSCF 3 MSCF Page 1 of 1 REPORT NO: 02-0302 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 13 May 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 13: 15 13:35 0 Hrs 20 Mins First Determination of Cause: 1. Depressured IP Separator for Maintenance. Action Taken to Stop Flaring: 1. Completed depressuring. Tuesday, May 28, 2002 Black Intermittent Smoke D D Planned TOTAL VOLUME ~ VOLUME 53 MSCF 53 MSCF Page 1 of 1 bp REPORT NO: 02-0308 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 15 May 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 14:55 15:00 OHrs 5Mins D D ~ 3 MSCF 2. Flare/Relief Valve 17:10 17:15 OHrs 5Mins D D D 30 MSCF 3. Flare/Relief Valve 17:20 17:25 OHrs 5Mins D D D 30 MSCF 4. Flare/Relief Valve 17:35 17:40 OHrs 5Mins D D D 30 MSCF 5. Flare/Relief Valve 17:50 17:55 OHrs 5Mins D D D 30 MSCF 6. Flare/Relief Valve 21:00 21:05 OHrs 5Mins D D ~ 3 MSCF TOTAL VOLUME 126 MSCF First Determination of Cause: 1. SWAPPED LM1500 COMPRESSORS 2. 1801 fail to start. Hi exhaust gas temp. 3. 1801 fail to start second time around. 4. 1801 fail to start third time around. 5. 1801 fail to start forth time. 6. normal stop 1802. Action Taken to Stop Flaring: 1. PUT T/C-1802 ON LINE AND SHUT DOWN T/C-1801. 2. Case depressured as set by sid sequence. 3. Case depressured as set by sid sequence. 4. Case depressured as set by sid sequence. Tuesday, May 28, 2002 Page 1 of 2 bp BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 15 May 2002 8. Case depressured as set by sid sequence. 9. Case depressured as set by sid sequence. Tuesday, May 28, 2002 REPORT NO: 02-0308 Page 2 of 2 bp FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0342 BPXA FLARE REPORT PRUDHOE BAY DATE: 31 May 2002 TIME OF FLARING Start Stop Duration 09:45 09:50 0 Hrs 5 Mins Black Intermittent Smoke D D TOTAL VOLUME ~ First Determination of Cause: 1. SWAPPED LM1500 COMPRESSORS Action Taken to Stop Flaring: 1. PUT 1802-T/C ON LINE AND SHUT DOWN T/C-1801 Sunday, June 02, 2002 Planned VOLUME 3 MSCF 3 MSCF Page 1 of 1 Facility FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 06/2002 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 10,584 4. Flared or vented greater than 1 hour ~ z:r~ (Supplemental report required - See 20 AAC 25.235) 81450 5. Pilot and Purge 41 ,483 6. Used for lease operations Fuel 676,229 Assist 259 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 732,905 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 259,312 11. Transferred to: CCP 61,204,325 Remarks: I hereby cecr,that t~egOing,i~ true and correct to the best of my knowledge. Signature: .~ . A ^"^ A '1 Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety 8,450 MCF~ 2. Lease Use MCF 3. Conserv. Purposes MCF b~ Vl/6)- Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. I BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT· FS-1 GAS FLARING INCIDENT REPORT June 2002 Page 1 lunplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 6/14/2002 1300-1330 6,200 Not required for unplanned events which 6/14/2002 2100-2200 4,100 are less than or equal to 1 hour 6/25/2002 2045-2122 278 TOTAL 10,578 lunPlanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 6/14/2002 1630-2100 4,350 See attachments TOTAL 4,350 Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 6/1/2002 1415-1420 3 See attachments 6/1/2002 1620-1625 3 TOTAL 6 1 Hour OR Exceedin 5000 Mct See attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 4,350 6 o TOTAL FLARED VOLUME 56,676 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments See attachments 7/9/2002 11:07 AM bp REPORT NO: 02-0345 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 01 Jun 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 14:15 14:20 OHrs 5Mins D D ~ 3 MSCF 16:20 16:25 OHrs 5Mins D D ~ 3 MSCF TOTAL VOLUME 6 MSCF First Determination of Cause: 1. Three failed starts on 1801 T/C. 2. Unloaded 1802 T/C and loaded 1801 T/C. Action Taken to Stop Flaring: 1. Adjusted fuel gas pressure and started 1801 T/C. 2. Normal stop on 1802 T/C. Saturday, June 29, 2002 Page 1 of 1 bp FACILITY: FS1 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve 3. Flare/Relief Valve REPORT NO: 02-0374 BPXA FLARE REPORT PRUDHOE BAY DATE: 14 Jun 2002 TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 13:00 13:30 OHrs 30 Mins D D D 6,200 MSCF 16:30 21:00 4Hrs 30 Mins ~ ~ 0 4,350 MSC~ ....{. "'I e 21:00 22:00 1 Hrs OMins D D D 4,100 MSCF ~Iv.ur TOTAL VOLUME 14,650 MSCF 6ß~ $' I \oz- First Determination of Cause: 1. T /C # 1803 SID due to problems encountered during an Inverter P.M. 2. Due to an Inverter failure at P.C.M. # 1, the Tie-line S/!. This failure also caused the F.S. Control Room Setcim System to S.D. Subsequently the Annex and F.S were O.S.D.'d. Flaring occurred intermittently off the Crude Oil Surge Drum, with some black smoke excursions. 3. T/C # 1801 wouldn't take the load. Action Taken to Stop Flaring: 1. P.M. completed and T/C # 1803 resarted and loaded. 2. Automation and Electricial Techs made necessary repairs. The F.S. and Annex were returned to service. 3. Cycled T/C speed combined with fresh production allowed recycle temps to fall enough for T/C # 1801 to take the load. Saturday, June 29,2002 ~~\'~~7 , \~~~~ ( ~ ~(>\~.?oJ '-.: .. -A\ \ '\ i VI" Page 1 of 1 FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 07/2002 Facility Disposition Volume MCF" *Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour. 371 4. Flared or vented greater than 1 hour Supplemental report required - See 20 AAC 25.235) 84 5. Pilot and Purge 37,458 6. Used for lease operations Fuel Assist 7. Other Lift Gas, Off Field 661,907 4,181 o 9. Purchased gas o 1. Safety BA MCF .:::ßp..... 2. Lease Use MCF 3. Conserv. Purposes MCF ~::1}Myi.· ~.. fl uA~~ Commlss ner Date TOTAL items 1 - 7 704,001 8. NGL gas equivalent produced o 10. Transferred from: CGF 253,825 11. Transferred to: CCP 58,006,531 I hereby ce Signature: Form 10-422 (Revised 4/95) true and correct to the best of my knowledge. Title: SUPERVISOR Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 MC 25.235. Remarks: BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT July 2002 Page 1 7/14/2002 7/16/2002 7/27/2002 1324-1355 0330-0400 0727 -0738 1 Not required for unplanned events which 2 are less than or equal to 1 hour 76 Not required for unplanned events which are less than or equal to 1 hour TOTAL 79 7/14/2002 7/16/2002 0825-0955 1500-1810 22 See attachments 62 See attachments TOTAL 84 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 7/15/2002 7/25/2002 7/26/2002 See attachments 1743-1810 2200-2205 1211-1216 TOTAL 286 See attachments 3 3 292 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf TOTAL 0 Unplanned Events < 1 Hour 79 Unplanned Events> 1 Hour 84 Planned Events < 1 hour and not 292 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge Assist 8/8/2002 2:16 PM TOTAL FLARED VOLUME 42,094 REPORT NO: 02-0442 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 14 Jul 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 08:25 09:55 1 Hrs 30 Mins D D D 22 MSCF 13:24 13:55 OHrs 31 Mins D D D 1 MSCF TOTAL VOLUME 23 MSCF First Determination of Cause: 1. Flared to depressure 5-0 commonline for replacing bad check valve in 4906-A module. Flaring was done at Drill Site #5. 2. Flared off 5-0 commonline to depressure due to leaking check valve in 4906. Flaring was limited to the short run of commonline from the ESD valve in 4906 to the divert valves. Action Taken to Stop Flaring: 1. Commonline depressuring was completed through drill Site #5. 2. Commonline 5-0 commonline was depressured and leak was stopped. Monday, July 22, 2002 Page 1 of 1 FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0527 BPXA FLARE REPORT PRUDHOE BAY DATE: 15 Jul 2002 TIME OF FLARING Start Stop Duration 17:43 18:10 0 Hrs 27Mins First Determination of Cause: 1. De-pressured "A" HP Separator for maintenance. Action Taken to Stop Flaring: 1. Completed de-pressuring "A" HP Separator. Tuesday, August 06, 2002 Black Intermittent Smoke D D Planned TOTAL VOLUME ~ VOLUME 286 MSCF 286 MSCF Page 1 of 1 REPORT NO: 02-0448 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 16 Jut 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 03:30 04:00 OHrs 30 Mins D D D 2 MSCF 15:00 18:10 3Hrs 10 Mins D D D 62 MSCF TOTAL VOLUME 64 MSCF First Determination of Cause: 1. depressured 18-0 to flare to changeout 5-0 check valve in 4906. 2. Flared to depressure A H/P separator for maint. To change out check valve on 5 delta commonline in 4906. Action Taken to Stop Flaring: 1. 5-0 manifold depressured. 2. H/P separator depressuring to flare completed. Monday, July 22, 2002 Page 1 of 1 FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0477 BPXA FLARE REPORT PRUDHOE BAY DATE: 25 Jul 2002 TIME OF FLARING Start Stop Duration 22:00 22:05 0 Hrs 5 Mins First Determination of Cause: 1. Shutdown 1801 T /C for maintenance. Action Taken to Stop Flaring: 1. 1802 T/C in service. Thursday, August 01, 2002 Black Intermittent Smoke D D Planned TOTAL VOLUME ~ VOLUME 3 MSCF 3 MSCF Page 1 of 1 FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0479 BPXA FLARE REPORT PRUDHOE BAY DATE: 26 Jul 2002 TIME OF FLARING Start Stop Duration 12:11 12:16 0 Hrs 5Mins First Determination of Cause: 1. SHUTDOWN 1802-T/C COMPRESSOR Black Intermittent Smoke D 0 Planned TOTAL VOLUME ~ Action Taken to Stop Flaring: 1. 1801-T/C BACK IN SERVICE AFTER 1500-HR. INSPECTION. Thursday, August 01, 2002 VOLUME 3 MSCF 3 MSCF Page 1 of 1 Facility FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 08/2002 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 596 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 36,590 6. Used for lease operations Fuel 672,582 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 709,768 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 257,043 11. Transferred to: CCP 60,516,287 Remarks: I hereby ce(2~(J,tr:;egOi~V; true and correct to the best of my knowledge. Signature: ~, J\ M'" 1.1 Title: SUPERVISOR Form 1 0-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT August 2002 Page 1 Unplanned Events less than or equal to 1 hour 8/8/2002 0530-0540 26 Not required for unplanned events which are less than or equal to 1 hour Not required for unplanned events which are less than or equal to 1 hour TOTAL 26 See attachments See attachments TOTAL o Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf 8/22/2002 8/24/2002 1336-1422 1305-1350 457 See attachments 113 See attachments TOTAL 570 Planned Events Exceeding 1 Hour OR Exceedin TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 570 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge Assist 9/11/2002 3:51 PM TOTAL FLARED VOLUME 37,186 REPORT NO: 02-0615 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 22 Aug 2002 SYSTEM TIME OF FLARING Start Stop Duration o Hrs 0 Mins 1. 2. Controlled Blowdow 13:36 14:22 0 Hrs 46 Mins First Determination of Cause: 1. Depressured 'A' HP Separator for maintenance work. Action Taken to Stop Flaring: 1. Completed depresuring. Thursday, September 05, 2002 Black Intermittent Smoke Planned VOLUME 0 D D o MSCF 0 0 ~ 457 MSCF TOTAL VOLUME 457 MSCF Page 1 of 1 REPORT NO: 02-0616 BPXA FLARE REPORT PRUDHOE SAY FACILITY: FS1 DATE: 24 Aug 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 13:05 13:50 0 Hrs 45 Mins First Determination of Cause: 1. Depressured 'A' HP Separator for maintenance work. Action Taken to Stop Flaring: 1. Completed depressuring. Thursday, September 05, 2002 Black Intermittent Smoke o 0 Planned ~ TOTAL VOLUME VOLUME 113 MSCF 113 MSCF Page 1 of 1 Facility FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year 0 Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 09/2002 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 380 4. Flared or vented greater than 1 hour 3,131 ./ (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 28,716 6. Used for lease operations Fuel 422,080 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 454,307 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 182,674 11. Transferred to: CCP 38,108,052 Remarks: I hereby cert~tQ~h~gOing ~true and correct to the best of my knowledge. Signature: ., ~ ~"" n Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety 3 31 MCF3&2- , 2. Lease Use MCF 3. Conserv. Purposes MCF , 11;r-(o;y Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT September 2002 Page 1 ¡Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour TOTAL o Junplanned Events !i!reater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments ACTION TAKEN TO ELIMINATE: CAUSE See attachments TOTAL o JPlanned Events Less Than or Equal 1 Hour AND Not Exeeedin~ 5000 Met DATE TIME VOLUME DI;SCRIPT,ONOFINCIDI;NT&CAUSE 9/5/2002 1107-1153 15 See attachments 9/14/2002 0940-0950 60 9/22/2002 0940-0945 3 9/22/2002 1720-1725 c:. bv"t'~ ,. ..- 9/26/2002 0001-0010 f¡¿'-f:i:kJ ~ (I? s.&'f. òf- ) . 9/27/2002 1512-1605 99"" qll'-/oZ .ev-ed- ~w ( ~h'1.~.....<'..) 9/28/2002 1545-1555 40 . ACTION TAKEN TO ELIMINATE CAUSE See attachments TOTAL 3ø -5 &- ¡ z.{ 12.-/ö''Z- 9/6/2002 9/6/2002 9/26/2002 9/26/2002 9/27/2002 0445-0735 1510-1800 0720-0844 1312-1420 0515-0630 See attachments 5000 Met Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME ~ 3í11 0 (ßfž .380" :32(;¡ Iz/¡ 'Z.o/Q'Z- 3).3+ 31q5 TOTAL 32,227 1 0/7/2002 1 :31 PM REPORT NO: 02-0617 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 05 Sep 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 11 :07 11 :53 0 Hrs 46 Mins First Determination of Cause: 1. Depressured 'A' IP Separator for maintenance. Action Taken to Stop Flaring: 1. Completed depressuring. Wednesday, September 25, 2002 Black Intermittent Smoke D 0 Planned TOTAL VOLUME ~ VOLUME 15 MSCF 15 MSCF Page 1 of 1 bp REPORT NO: 02-0622 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 06 Sep 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 04:45 07:35 2 Hrs 50 Mins 2. Controlled Blowdow 15:10 18:00 2Hrs 50Mins First Determination of Cause: 1. Depressured Old Plant for turnaround work. 2. Depressured Annex and all Common lines. Action Taken to Stop Flaring: 1. Completed depressuring of plant. Black Intermittent Smoke Planned VOLUME 0 0 ~ 790 MSCF D D ~ 1,265 MSCF TOTAL VOLUME 2,055 MSCF 2. Completed the depressuring of the Annex and all commonlines. Wednesday, September 25, 2002 Page 1 of 1 FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0652 BPXA FLARE REPORT PRUDHOE BAY DATE: 14 Sep 2002 TIME OF FLARING Start Stop Duration 09:40 09:50 0 Hrs 10 Mins First Determination of Cause: 1. Normal stop 1804 LPS Compressor. Action Taken to Stop Flaring: 1. Depressing completed. Wednesday, September 25,2002 Black Intermittent Smoke D D Planned TOTAL VOLUME ~ VOLUME 60 MSCF 60 MSCF Page 1 of 1 REPORT NO: 02-0663 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 22 Sep 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 09:40 09:45 OHrs 5Mins 0 0 ~ 3 MSCF 17:20 17:25 OHrs 5Mins 0 0 ~ 3 MSCF TOTAL VOLUME 6 MSCF First Determination of Cause: 1. Normal stop 1801 TC. 2. Normal stop 1802 TC. Action Taken to Stop Flaring: 1. 1801 Case depressuring completed. 2. 1802 Case depressuring completed. Wednesday, September 25,2002 Page 1 of 1 REPORT NO: 02-0671 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 26 Sep 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 00:01 00:10 OHrs 9Mins 0 D ~ 60 MSCF 2. Other 07:20 08:44 1 Hrs 24 Mins D D ~ 291 MSCF 3. Other 13:12 14:20 1 Hrs 8Mins 0 D ~ 472 MSCF TOTAL VOLUME 823 MSCF First Determination of Cause: 1. Normal stop LPS Turbine 1803 for water wash. 2. Crank LPS Turbine 1803 for cool down for Water Wash 3. Crank LPS Turbine 1803 for Water Wash Action Taken to Stop Flaring: 1. Flaring completed after normal stop. 2. Completed Cool Down 3. Completed Water Wash Tuesday, October 01, 2002 Page 1 of 1 bp REPORT NO: 02-0674 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 27 Sap 2002 SYSTEM 1. Other 2. Other TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 05:15 06:30 1 Hrs 15 Mins 0 D ~ 313 MSCF 15:12 16:05 OHrs 53 Mins 0 0 ~ 199 MSCF TOTAL VOLUME 512 MSCF First Determination of Cause: 1. Crank 1804 to cool down for water wash. 2. 1804 Water Wash Action Taken to Stop Flaring: 1. Completed T /C cool down 2. Completed Water Wash Tuesday, October 01, 2002 Page 1 of 1 bp FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0682 BPXA FLARE REPORT PRUDHOE BAY DATE: 28 Sep 2002 TIME OF FLARING Start Stop Duration 15:45 15:55 0 Hrs 10 Mins First Determination of Cause: 1. Unable to load 1804 T /C after water wash. Action Taken to Stop Flaring: 1. Completed flaring Tuesday, October 01, 2002 Black Intermittent Smoke D 0 Planned ~ TOTAL VOLUME VOLUME 40 MSCF 40 MSCF Page 1 of 1 Facility FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 10/2002 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 0 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 37,414 6. Used for lease operations Fuel 664,803 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 702,217 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 280,192 11. Transferred to: CCP 63,935,903 Remarks: I hereby cell a.t ~egOi~~ is true and correct to the best of my knowledge. Signature: '. /VIA J. Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT October 2002 Page 1 Unplanned Events less than or equal to 1 hour Not required for unplanned events which are less than or equal to 1 hour Not required for unplanned events which are less than or equal to 1 hour TOTAL o Junplanned Events greater than 1 hour ·OATE· .. TIME· . . VOLUME .·DESCRIPTIONOFINCIOENT&CAUSE· See attachments ACTION TAKEN TO ELIMINATE CAUSe . See attachments TOTAL o Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf . . .. DATE .. TIME . VOLUME· DESCRIPTION OF INC!DENT & CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE· See attachments TOTAL o 'Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf .. DATE TIME .... .. VOLUME . DE$CRIPTIONOFINCIOENT&CAUSE See attachments . . .. . ACTION TAKEN TO ELIMINATE CAUSE . See attachments I TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME o o o o 37,414 11/7/2002 3: 15 PM FLOW STATION 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 11/2002 Facility Disposition Volume MCF" "Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour. 2,531 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 810 5. Pilot and Purge 31,989 6. Used for lease operations Fuel Assist 626,699 o 7. Other Lift Gas, Off Field o 1. Safety '1310 TOTAL items 1 - 7 662,029 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas o 3. Conserv. Purposes MCF 10. Transferred from: CGF 264,461 I i -r/~:y Date 11. Transferred to: CCP 59,804,514 I hereby ce~ lr J1e foreg<rrg is true and correct to the best of my knowledge. Signature: lZ- I~ Title: SUPERVISOR Form 10-422 (Revised 4/95) Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Remarks: FACILITY: FS1 SYSTEM 1. Flare/Relief Valve BPXA FLARE REPORT PRUDHOE BAY DATE: 04 Nov 2002 TIME OF FLARING Start Stop Duration 11 :50 11 :55 0 Hrs 5Mins First Determination of Cause: 1. Normal Shutdown on 1804 T /C Action Taken to Stop Flaring: 1. Normail Shutdown on 1804 T /C Tuesday, November 26, 2002 Black Intermittent Smoke D D REPORT NO: 02-0767 Planned VOLUME 60 MSCF 60 MSCF TOTAL VOLUME ~ ? (~c¡ t í(F~~ Page 1 of 1 REPORT NO: 02-0779 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 07 Nav 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 00:00 24:00 23 Hrs 59 Mins Black Intermittent Smoke Planned D D ~ VOLUME 810 MSCF 810 MSCF TOTAL VOLUME First Determination of Cause: 1. Use stripping gas while fs1 was down. Keep regen circulation with out a STV compressor. Flared gas to stv third stage. Action Taken to Stop Flaring: 1. Started up STV compressor. Cloced STV third stage. Stopped flaring. !'7 ~. .' ;.~.I.Þ.. ,~) 4:l"" . ~ t ~ JoJ Tuesday, November 26. 2002 Page 1 of 1 FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0806 BPXA FLARE REPORT PRUDHOE BAY DATE: 15 Noy 2002 TIME OF FLARING Start Stop Duration 11 :00 11 :05 0 Hrs 5Mins Black Intermittent Smoke D D TOTAL VOLUME ~ First Determination of Cause: 1. SHUT DOWN T/C-1801 FOR 4500 HR.INSPECTION Action Taken to Stop Flaring: 1. STARTED UP T/C-1802 FOR T/C-1801INSPECTION. Tuesday,November26,2002 Planned VOLUME 3 MSCF 3 MSCF Page 1 of 1 FACILITY: FS1 SYSTEM 1. Flare/Relief Valve REPORT NO: 02-0838 BPXA FLARE REPORT PRUDHOE BAY DATE: 29 Nov 2002 TIME OF FLARING Start Stop Duration 17:15 17:18 0 Hrs 3Mins Black Intermittent Smoke D D TOTAL VOLUME Ii?] First Determination of Cause: 1. SID 1802 T/C NORMAL STOP. PUT 1801 T/C ONLINE Action Taken to Stop Flaring: 1. NORMAL SID OF 1802 T/C. PUT 1801 ONLINE Monday, December 02, 2002 Planned VOLUME 3 MSCF 3 MSCF Page 1 of 1 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT November 2002 ~Unplanned Events less than or equal to 1 hour ········'iDATEE······························ ··'JT'ME"·· ...... ...... ;¥O!.\UME"i'ºESº !!!I?;J'!oN,oft.~!DENTt&tCAUSE' 11/3/2002 1900-1903 60 Not required for unplanned events which 11/3/2002 2030-2031 3 are less than or equal to 1 hour 11/16/2002 0310-0340 115 11/24/2002 1959-2013 525 11/25/2002 0730-0805 1 ,312 11/25/2002 0822-0826 150 11/25/2002 0837-0845 300 Page 1 TOTAL 2,465 ~Unplanned Events greater than 1 hour ,DATE· . TIME VOLUME ,.. DESCmPTIONOF INCIDENT a CAUSE See attachments TOTAL o ~Planned Events Less Than or Equal 1 Hour AND Not Exceedin l5000 Mef DATE ..... . TIME . . VOLUME . DESCRIPTION OF INCIDENT & CAUSE 11/4/2002 1150-1155 60 See attachments 11/15/2002 1100-1105 3 11/29/2002 1715-1718 3 TOTAL 66 ACTIOI'HAKENTO ELIMINATE CAUSE; . Not required for unplanned events which are less than or equal to 1 hour . ..ACTIONTAKENTOELIMINATECAUSE. See attachments .~ .. .... . ACTION TAKEN TO ELIMINATE CAUSE . See attachments ~Planned Events Exceeding 1 Hour OR ExceedinQ 5000 Mef . DATE .. TIME VOLUME DESCRIPTION OF INCIDENT a CAUSE 11/7/2002 0000-2400 810 See attachments TOTAL 810 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5.000 MCF Pilot Purge Assist o 66 810 TOTAL FLARED VOLUME 35,330 ACTION 'JTAKEN TO ELIMINATE CAUSE ' ,. . See attachments 12/9/2002 11:24 AM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 12/2002 FLOW STATION 1 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 159 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 32,452 6. Used for lease operations Fuel 763,890 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 796,501 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: CGF 306,292 11. Transferred to: CCP 81,125,875 Remarks: I hereby ce(J Qat ~e fOregOi~ is true and correct to the best of my knowledge. Signature: 1 A.I\",^ I 1..- Title: SUPERVISOR Form 1 0-422 (Revised 4/95 "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 1 00.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - FS-1 GAS FLARING INCIDENT REPORT December 2002 ~Unplanned Events less than or equal to 1 hour DATE TIME. VOLUME.. . PESCRIPTION OF INCIDENT & CAUSE 12/21/2002 1411-1416 156 Not required for unplanned events which are less than or equal to 1 hour Page 1 TOTAL 156 ~Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL o ~Planned Events Less Than or E9ual1 Hour AND Not Exceedin~ 5000 Mcf . DATE· .. TIME. VOLUME·· . DESCRIPTION OF INCIDENT & CAUSE 12/2/2002 1642-1645 3 See attachments TOTAL 3 ~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf . . DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL o Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist o 3 o TOTAL FLARED VOLUME 32,611 . ACTION TAKEN TO ELIMINATE CAuSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments . ACTION TAKEN TO ELIMINATE CAUSE See attachments 1/10/2003 3:30 PM bp REPORT NO: 02-0847 BPXA FLARE REPORT PRUDHOE BAY FACILITY: FS1 DATE: 02 Dee 2002 TIME OF FLARING SYSTEM Start Stop Duration 1. Controlled Blowdow 16:42 16:45 0 Hrs 3 Mins First Determination of Cause: 1. 1801 TIC NORMAL SHUTDOWN Action Taken to Stop Flaring: 1. 1802 T /C STARTED UP FOR TESTING Thursday, December 26, 2002 Black Intermittent Smoke D 0 Planned TOTAL VOLUME ~ VOLUME 3 MSCF 3 MSCF Page 1 of 1