Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU FS 3 / BP Exploration
STATE OF ALASKA
AOGCC
GAS DISPOSITION FILES
YEAR: 2002
FACILITY: PBU FS 3
OPERATOR: BP EXPLORATION
(ALASKA) IN C
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 01/2002
FLOW STATION 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 141
/
4. Flared or vented greater than 1 hour 87
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,714
6. Used for lease operations Fuel /
1,015,093 .
Assist 82
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,036,117
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 1,035,807
11. Transferred to: CCP 31,216,456
Remarks:
I hereby cert~ that t1 fOreg~Ue and correct to the best of my knowledge.
Signature: .0. .Á A.)}. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1 . Safety
MCF
2. Lease Use
~ 1- MCF
3. Conserv. Purposes
MCF
Go;:::!l"+~);' 'Ä 'If
Commissio er l
3Js-J~
Date
L. "/....
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
JANUARY, 2002
Page 1
IUnplanned Events less than or equal to 1 hour
DATE ... TIME . ... VOLUME ... DESCRIPTION OF INCIDENT & CAUSE
1/26/2002 1620-1630 76 Not required for unplanned events which
1/27/2002 0855-0900 3 are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE ....
Not required for unplanned events whi<
are less than or equal to 1 hour
I
TOTAL
79
IUnplanned Events greater than 1 hour
. DATE .. TIME .... . VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
,
ACTION TAKEN TO ELIMINATE CAUSE ...
...." """,... ...",..., ..."",.", ,-,.........,, _,_"".",.", _._,_...."",... .u,_""""., .u,_"..""." ,_,_,.".
See attachments
IPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE· . TIME VOLUME . DESCRIPTION OF INCIDENT & CAUSE
1/25/2002 2330-2400 50 See attachments
1/26/2002 1800-1805 3
1/27/2002 1230-1235 3
1/27/2002 1350-1355 3
1/28/2002 1915-1920 3
TOTAL 62
.~
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Planned Events Exceeding 1 Hour OR Exceedin
1/26/2002
0000-0130
TOTAL
87 See attachments
87
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour & not
exceeding 5,000 MCF
Planned Events> 1 hour and
exceeding 5,000 MCF
Pilot Purge
Assist
79
o
62
87
TOTAL FLARED VOLUME
REPORT NO: 02-0069
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 25 Jan 2002
TIME OF FLARING Black
... ...._SYST.EM__.....Start...Stop-.__.Duration .....Jntermitten1_Smoke__J:»Janned_V.QLUME..-
1. Controlled Blowdow 23:30 24:00 0 Hrs 30Mins D D ~ 50 MSCF
TOTAL VOLUME
50 MSCF
First Determination of Cause: \
1. Began depressuring 14B/Cand 140 common lines for OS 14 divert valve replacement. Meter 370.
Action Taken to Stop Flaring:
1. Oepressured Cl's to lPS system before beginning blowdown to flare system.
Thursday, January 31, 2002
Page 1 of 1
FACILITY: FS3
SYSTEM
1. Controlled Blowdow
2. Flare/Relief Valve
3. Flare/Relief Valve
REPORT NO: 02-0052
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 26 Jan 2002
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned
00:00 01:30 1 Hrs 30 Mins D D ~
16:20 16:30 OHrs 10 Mins D D D
18:00 18:05 OHrs 5Mins D D ~
TOTAL VOLUME
First Determination of Cause:
1. Completed depressuring 14B/C and 140 commonlines for OS-14 divert valve changes.
2. Instrumentation malfunction on 1802 compressor while loading.
3. T/C 1802 compressor shutdown for maintenance.
Action Taken to Stop Flaring:
1. Oepressuring completed.
2. Loaded 1801 compressor.
3. Normal compressor blowdown volume.
Tuesday, January 29, 2002
VOLUME
87 MSCF
76 MSCF
3 MSCF
166 MSCF
J
Page 1 of 1
REPORT NO: 02-0062
BPXA FLARE REPORT
PRUDHOE SAY
FACILITY: FS3 DATE: 27 Jan 2002
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 08:55 09:00 OHrs 5Mins D D D 3 MSCF
2. Flare/Relief Valve 12:30 12:35 OHrs 5Mins D D ~ 3 MSCF
3. Flare/Relief Valve 13:50 13:55 OHrs 5Mins D D ~ 3 MSCF
TOTAL VOLUME 9 MSCF
First Determination of Cause:
1. T /C 1802 shutdown with an instrument malfunction while preparing to load.
2. T/C 1801 shutdown and returned to standby.
3. T/C 1802 shutdown for maintenance.
Action Taken to Stop Flaring:
1. Normal compressor blowdown volume.
2. Normal compressor blowdown volume.
3. Normal compressor blowdown volume.
Tuesday, January 29, 2002
Page 1 of 1
REPORT NO: 02-0061
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 28 Jan 2002
SYSTEM
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 19:15 19:20 OHrs 5Mins
D
D
~
3 MSCF
TOTAL VOLUME
3 MSCF
First Determination of Cause:
1. Shutdown 1801 turbine and returned to standby.
Action Taken to Stop Flaring:
1. Normal compressor blowdown volume.
Tuesday, January 29, 2002
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Vear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 02/2002
FLOW STATION 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 648
4. Flared or vented greater than 1 hour 1,005 /
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 19,328
6. Used for lease operations Fuel 912,162
Assist 5,058
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 938,201 I
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 931 ,490
11. Transferred to: CCP 29,013,519
Remarks:
I hereby cer ,. ~ t1\foregoing ~~~rue and correct to the best of my knowledge.
Signature: I J. .l J ^^" .If Title: SUPERVISOR
Form 1 0-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
lAtçA-
)/22.-10 L
/Oo~
3. Conserv. Purposes
MCF
eft ~.~
co~ner
3/J-ðfcJ-
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
FEBRUARY, 2002
Page 1
Unplanned Events less than or equal to 1 hour
2/4/2002
2/15/2002
1830-1840
1358-1402
60 Not required for unplanned events which Not required for unplanned events whi
18 are less than or equal to 1 hour are less than or equal to 1 hour
TOTAL
78
lunPlanned Events greater than 1 hour
DATE ..< TIME· ............... VOLl,JME. .... DE$Ç¡:¡fPTI()t4 ()Fft4ÇIDENT~ÇAtJSE
See attachments
TOTAL 0
<AÇTION"'~KI;t4T() I;LfMINA,..~CAUSE ..
See attachments
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
~A"'I;..+rrr·· ···················..TIME WVOIUUMEWW· r~§Sç~I~,..IONJOf11lNÇ(~I;NT¡~WCAJ!lS§·····
2/3/2002 1200-1215 60 See attachments
2/4/2002 0545-0555 60
2/10/2002 1040-1100 350
2/15/2002 0210-0215 60
2/15/2002 0540-0545 40
ACT10N,TAKEN TO ELIMINATE CAUSE ....
See attachments
TOTAL
570
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
2/4/2002
0032-0208
TOTAL
1,005 See attachments
1,005
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
78
o
570
1,005
TOTAL FLARED VOLUME
26,039
bp
REPORT NO: 02-0094
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 04 Feb 2002
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smo~anned
1. Flare/Relief Valve 00:32 02:08 1 Hrs 36 Mins 0 0 ~
2. Flare/Relief Valve 05:45 05:55 OHrs 10 Mins D 0 ~
3. Flare/Relief Valve 18:30 18:40 OHrs 10 Mins D D D
VOLUME...
1,005 MSCF
60 MSCF
60 MSCF
TOTAL VOLUME 1,125 MSCF
First Determination of Cause:
1. Oepressured 68, 60, and 6C/13B common lines from 170 psi to 0, for a OS6 S/O to replace divert
valves. Gas swept 6B for possible work on a corrosion cupon valve removal.
2. Normal stopped 1804 after drying the compressor out after a water wash.
3. 1803 compressor S/O on a overspeed trip during start up of 1804 compressor.
Action Taken to Stop Flaring:
1. Completed depressuring the common lines.
2. completed depressure of the compressor.
3. Restarted 1803 compressor as soon as a check/ready was achived.
Tuesday, February 26,2002
Page 1 of 1
bp
REPORT NO: 02-0093
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 03 Feb 2002
TIME OF FLARING Black
S~ Start Stop Duration Intermittent Smoke Planned VOLUME..-
1. Flare/ReliefValve 12:00 12:15 OHrs 15Mins D D ~ 60 MSCF
TOTAL VOLUME
60 MSCF
First Determination of Cause:
1. Normal stop of 1804 compressor for an IGV/Stator inspection and water wash.
Action Taken to Stop Flaring:
1. Completed normal stop of 1804.
Tuesday, February 26, 2002
Page 1 of 1
bp
REPORT NO: 02-0102
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 10 Feb 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
StarL.Stop Duration...
10:40 11 :00 0 Hrs 20 Mins
Black
Intermittent Smoke
Planned
D 0
~
VOLUME..
350 MSCF
350 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Flared through the operational meter 355 due to problems with the 5th stage flare pilots not being lit
and trying to ignite it. All of the pilots were out and had to use flares.
Action Taken to Stop Flaring:
1. Got 5th stage pilots lit.
Tuesday, February 26,2002
Page 1 of 1
bp
REPORT NO: 02-0107
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 15 Feb 2002
TIME OF FLARING Black
_----.SySTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:10 02:15 OHrs 5Mins D D ~ 60 MSCF
2. Flare/Relief Valve 05:40 05:45 OHrs 5Mins 0 0 ~ 40 MSCF
3. Flare/Relief Valve 13:58 14:02 OHrs 4Mins D D D 18 MSCF
TOTAL VOLUME 118 MSCF
First Determination of Cause:
1. Shutdown 1803 tic for waterwash and IGV inspection.
2. Shutdown 1803 tic after cooling for waterwash and IGV inspection.
3. 1803 T /C Panel 125v OC power failure caused Inlet Valve and HP Flare Valve to open.
Action Taken to Stop Flaring:
1. Normal compressor blowdown volume.
2. Aborted start blowdown volume.
3. Inlet Valve and HP Flare Valve were manually closed while the power supply problem was being
corrected.
Tuesday, February 26, 2002
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 03/2002
FLOW STATION 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 60
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,551
6. Used for lease operations Fuel 1,017,690
Assist 110
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,038,411
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 1,038,241
11. Transferred to: CCP 33,006,269
Remarks:
I hereby cen that tR foregoing iþ true and correct to the best of my knowledge.
Signature: . (1. Å A.N'v\ 1 DJ. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
MARCH, 2002
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME. DESCFUÞTION OF INCIDENT & CAUSE
3/4/2002 0520-0525 60 Not required for unplanned events which
are less than or equal to 1 hour
I
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events whi,
are less than or equal to 1 hour
TOTAL
60
See attachments
o
See attachments
TOTAL
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
ACTION TAKeN TQELlMINATE CAUSE
See attachments
I
TOTAL
o
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSe
See attachments
I
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
60
o
o
o
TOTAL FLARED VOLUME
20,721
Facility
FLOW STATION 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 04/2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 66
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,312
6. Used for lease operations Fuel 969,385
Assist 171
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 989,934
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 989,697
11. Transferred to: CCP 29,597,925
Remarks:
I hereby cert~ t~he t.egoin~;:;;lt and correct to the best of my knowledge.
Signature: . . ..l .A A.L Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
April 2002
Page 1
Unplanned Events less than or equal to 1 hour
4/12/2002
4/18/2002
0845-0855
1440-1445
60 Not required for unplanned events which Not required for unplanned events whi,
3 are less than or equal to 1 hour are less than or equal to 1 hour
TOTAL
63
tUnplanned Events greater than 1 hour
I)ATE ..... TIME. ... VOLUME.
OESÇRIPTION OF INCID¡:NT & CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE· ...
See attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
4/18/2002
1535-1540
3 See attachments
See attachments
TOTAL
3
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
See attachments
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
63
o
3
o
20,549
REPORT NO: 02-0231
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 18 Apr 2002
SYSTEM
1. FlarelRelief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
14:40 14:45 OHrs 5Mins D D 0 3 MSCF
15:35 15:40 OHrs 5Mins D D ~ 3 MSCF
TOTAL VOLUME 6 MSCF
First Determination of Cause:
1. tic 1802 shut down on high vibration while being idled (tic 1801 was being test run after 4000 hr
inspection) .
2. tic 1801 shut down after test run following its 4000 hr inspection.
Action Taken to Stop Flaring:
1. Normal compressor blowdown volume.
2. Normal compressor blowdown volume.
Tuesday, April 30, 2002
Page 1 of 1
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,309
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 21,472
6. Used for lease operations Fuel 955,758
Assist 4,027
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 982,566
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 977,230
11. Transferred to: CCP 27,124,214
Remarks:
I hereby cert~ that th~k and correct to the best of my knowledge.
Signature: . Q . Title: SUPERVISOR
Facility
FLOW STATION 3
Form 10-422 (Revised 4/95)
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU OS/2002
*Indicate contribution of each pool to total.
,
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
May 2002
Page 1
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE
5/7/2002 0400-0410 250 Not required for unplanned events which
5/9/2002 1345-1350 60 are less than or equal to 1 hour
5/9/2002 1400-1530 140 Intermittent - 15 minutes
5/9/2002 1345-1440 260
5/14/2002 0315-041 0 432
5/16/2002 1900-1905 3
5/24/2002 1440-1500 158
5/30/2002 0630-0635 3
5/31/2002 1330-1335 3
TOTAL
1,309
IUnplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTIONOFJNCIDENT&CAUSE
See attachments
TOTAL
o
Planned Events Exceeding 1 Hour OR Exceedin 5000 Mcf
DATE TIME VOLUME DESCRIPTIONOFINCIDENT&CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
1,309
o
o
o
26,808
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
6/6/2002
1:01 PM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Vear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 06/2002
FLOW STATION 3
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 2,095
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,148
6. Used for lease operations Fuel 914,383
Assist 4,027
7. Other Lift Gas, Off Field 0
TOTAL items 1 . 7 940,653
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 934,531
11. Transferred to: CCP 26,511,626
Remarks:
I hereby ce(2',(jt th~gOing is true and correct to the best of my knowledge.
Signature: . ..A ~ Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
June 2002
Page 1
~Unplanned Events less than or equal to 1 hour
. DATE . ... ... TIME· VOLUME DESCRIPTION OFINCIDENT~d~AUSE .
6/6/2002 0925-1010 860 Not required for unplanned events which
6/6/2002 1015-1045 477 are less than or equal to 1 hour
6/12/2002 1710-1720 208
TOTAL
1,545
IUnplanned Events greater than 1 hour
·······PATE ...TIME . Ve>4UME . ·DESCRIPTIONe>F INCIDENT & CAUSE
See attachments
TOTAL
o
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
. DATE .... TIME·· . .... . VOLUME . . DESCRIPTION OF INCIDENT & CAUSE
6/8/2002 0240-0245 240 See attachments
6/8/2002 0630-0635 155
6/8/2002 1 055-11 00 155
TOTAL
550
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME . .. VOLUME . DESCRIPTle>N qr= INCIDENT & CAUSE
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
550
o
TOTAL FLARED VOLUME
26,270
. ACTION TAKEN Tc> ELIMINATE CAUSE. . ....
Not required for unplanned events which
are less than or equal to 1 hour
. ACTle>N TAKEN TO ELIMINATECÄUSE
See attachments
. ACTION TAKEN TO ELIMINATE CAUSE .
See attachments
ACTION TAKENTe> I;LIMINATECAUSE
See attachments
7/9/2002
11 :07 AM
bp
REPORT NO: 02-0361
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 08 Jun 2002
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 02:40 02:45 OHrs 5Mins D 0 ~ 240 MSCF
2. Flare/Relief Valve 06:30 06:35 OHrs 5Mins 0 D ~ 155 MSCF
3. Flare/Relief Valve 10:55 11 :00 OHrs 5Mins D D ~ 155 MSCF
TOTAL VOLUME 550 MSCF
First Determination of Cause:
1. Shutdown T/C 1806 for turbine waterwash.
2. 1806 compressor and piping blowdown for non-fired start. Fuel gas blind installed for waterwash.
3. Shut down T/C 1806 after turbine waterwash.
Action Taken to Stop Flaring:
1. Normal stop compressor and piping blowdown volume.
2. Normal blowdown volume.
3. 1806 compressor and piping blowdown for non-fired start.
Saturday, June 29, 2002
Page 1 of 1
FLOW STATION 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Vear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 07/2002
Facility
Disposition
Volume MCF*
*Indicate contribution of each pool to total.
1. Sold
o
Pool Name
Code Percent
2. Reinjected
o
PRUDHOE
640150 100.00%
3. Flared or vented less than 1 hour.
10,435
4. Flared or vented greater than 1 hour
(Supplemental report re uired - See 20 AAC 25.235)
4,095
5. Pilot and Purge
22,031
6. Used for lease operations
Fuel
Assist
865,760
13,921
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
916,242
1. Safety
'f-Óq6" MCF J"~-
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from: CGF
874,470
G~OJ,,!.: ~
Commis~ner
II/vioy
Date
11. Transferred to: CCP
26,102,653
Remarks:
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 MC 25.235.
Signature:
Form 10-422 (Revised 4/95)
Title: SUPERVISOR
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - F5-3
GAS FLARING INCIDENT REPORT
July 2002
'Unplanned Events less than or equal to 1 hour
¡¡¡r;r¡r¡!~~ít1,ªšš77t;'¡kr,,!¡¡¡i¡B!t!f¡f~;¡SS'\;""'P;:~~~§M~¡m¡.jJ¡i~§~:¡I!eJli!~~:¡Wg!~§.t.fl!!jJ~~§¡i¡ig¡¡¡*¡:;%¡;/,
7/16/2002 1545-1645 7,667 Not required for unplanned events which
7/16/2002 1750-1755 40 are less than or equal to 1 hour
7/16/2002 1820-1825 40
7/16/2002 1915-1920 40
7/16/2002 2140-2145 40
7/16/2002 2350-2355 40
7/24/2002 1630-1700 230
7/24/2002 1630-1635 3
7/24/2002 1640-1645 3
7/25/2002 0800-0855 3 Intermittent
7/25/2002 1715-1720 155
7/25/2002 1908-1913 155
7/25/2002 2118-2123 155
7/28/2002 100H012 730
7/28/2002 1313-1327 295
Page 1
TOTAL
9,596
.."..'._,-",'
... .J
~t%I~~H1!E'IlillmQ~:Ë!I""~III¡XIII~~t;¡~ê~~¡: d!::¥g5;:f~t~*0<
See attachments
¡unplanned Events greater than 1 hour
'1: ;d;;JAr¡:;i;i';' .::.. Tlft,!!' Pl····! L .IlOI;UM!:;;¡:I)I¡!{OR~i1'IW'!;~":!#~J~E¡NT\8t .çA~.~":¡. ¡
7/19/2002 0555-0710 127 See attachments
7/27/2002 1100-1500 3,968 Intermittent
42.5D
~
TOTAL
::Ji3.e...
Planned Events Less Than or Equal 1 Hour AND Not Exceedin 5000 Mct
0830-0840
0330-0345
0350-0355
0930-
1145-1230
192 See attachments
60
3
7/19/2002
7/19/2002
7/27/2002
7/27/2002
7/2
7/30/2002
0830-0835
3
bß4
-5ßt2-
TOTAL
~
I
:··¡4;(¿ff~f:lif*lØEflmCl' !'¡:'!tIJll\I.!\rl:¡~.t~¡;;¡'fi.,f'·' .,'::¡'¡I
Not required for unplanned events which
are less than or equal to 1 hour
See attachments
attachments
Planned Events Exceedin 1 Hour OR Exceedin 5000 Mct
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5.000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
)I.rOO5 4'zs-v
ßW (ÓV4
.ðs¡t-
6l) tv
o
50.482
8/8/2002
2:17PM
bp
REPORT NO: 02-0443
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 15 Jul 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
08:30 08:40 0 Hrs 10 Mins
Black
Intermittent Smoke
Planned
D D
~
VOLUME
192 MSCF
192 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Oepressured C train slugcatcher and gas scrubber for maintenance on an associated valve.
Action Taken to Stop Flaring:
1. Vessels depressured.
Monday, July 22, 2002
Page 1 of 1
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
REPORT NO: 02-0455
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 19 Jul 2002
TIME OF FLARING
Start Stop Duration
03:30 03:45 0 Hrs 15 Mins
Black
Intermittent Smoke
D D
TOTAL VOLUME
~
First Determination of Cause:
1. 1806 T/C SHUT DOWN FOR PLANNED MAINTENANCE
Action Taken to Stop Flaring:
1. EQUIPMENT DE PRESSURED AND ISOLATED
Monday, July 22, 2002
Planned
VOLUME
60 MSCF
60 MSCF
Page 1 of 1
bp
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
REPORT NO: 02-0454
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 19 Jul2002
TIME OF FLARING
Start Stop Duration
05:55 07:10 1 Hrs 15Mins
Black
Intermittent Smoke
Planned
~ D
D
TOTAL VOLUME
First Determination of Cause:
1. 1802 T/C SHUT DOWN ON INSTRUMENT FAILURE
Action Taken to Stop Flaring:
1. 1801 T/C MECHANICAL PROBLEMS REPAIRED AND BROUGHT BACK ON-LINE
Monday, July 22, 2002
VOLUME
127 MSCF
127 MSCF
Page 1 of 1
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
REPORT NO: 02-0453
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 19 Jul 2002
TIME OF FLARING
Start Stop Duration
03:50 03:55 0 Hrs 5 Mins
Black
Intermittent Smoke
D D
Planned
TOTAL VOLUME
~
First Determination of Cause:
1. 1801 T/C SHUTDOWN DUE TO MECHANICAL PROBLEMS
Action Taken to Stop Flaring:
1. BROUGHT 1802 T/C ON-LINE
Monday, July 22, 2002
VOLUME
3 MSCF
3 MSCF
Page 1 of 1
REPORT NO: 02-0488
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 27 Jul2002
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 09:30 09:45 OHrs 15 Mins D D ~ 423 MSCF
2. Flare/Relief Valve ~:45 12:30 o Hrs 45 Mins D D ~ 155 MSCF
3. Flare/Relief Valve 11:00 15:00 4Hrs OMins ~ D D 3,968 MSCF
TOTAL VOLUME 4,546 MSCF
First Determination of Cause:
1. SESD testing of plant. 1801,1803,1804,1806 SID from idle.
Action Taken to Stop Flaring:
1. Completed SESD and BESD test. Compressors completed depressuring.
1~}Ac.F - ï/"'{iI'Sr
())~ ~;N-~'t:. ~
l~q >ILt~
..eo&J? ..J.$S.,tf- "-
.i!::--
~ It\OY\~
'~é-~~~
2. Depressured B LPS header in 4906 for a BESD spool piece change.
3. Intermittent relief valve flaring from bringing plant back up from TESD state.
2. Completed depressure of B LPS header and replaced bad spool piece.
3. Stabilized the plant at partial rates.
Thursday, August 01, 2002
Page 1 of 1
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
REPORT NO: 02-0496
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 29 Jul 2002
TIME OF FLARING
Start Stop Duration
20:00 20:05 0 Hrs 5 Mins
Black
Intermittent Smoke
D D
Planned
TOTAL VOLUME
~
First Determination of Cause:
1. Normal shut down of 1801 compressor aftter starting 1802 compressor.
Action Taken to Stop Flaring:
1. Normal depressure of compressor complete.
Thumday,August01,2002
VOLUME
3 MSCF
3 MSCF
Page 1 of 1
bp
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
REPORT NO: 02-0499
BPXA FLARE REPORT
PRUDHOE SAY
DATE: 30 Jul2002
TIME OF FLARING
Start Stop Duration
08:30 08:35 0 Hrs 5Mins
Black
Intermittent Smoke
D D
TOTAL VOLUME
~
First Determination of Cause:
1. Normal stop of 1802 compressor after start up of 1801.
Action Taken to Stop Flaring:
1. Compressor depressured for stand by status.
Thursday, August 01, 2002
Planned
VOLUME
3 MSCF
3 MSCF
Page 1 of 1
Facility
FLOW STATION 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Vear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 08/2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 577
4. Flared or vented greater than 1 hour 1,059
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,759
6. Used for lease operations Fuel 717,807
Assist 8,401
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 748,603
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 738,152
11. Transferred to: CCP 26,305,248
Remarks:
I hereby ce~ l1t t~ foregoing ~~rue and correct to the best of my knowledge.
Signature: "~ . ..Å, "'...... 'I Title: SUPERVISOR
Form 1 0-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
'j069 MCF ~
2. Lease Use
MCF
3. Conserv. Purposes
MCF
CDAw~ ~. ~./
commissi~r '
afJ-v/o,;>-
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
SP EXPLORATION (ALASKA) INC.
PRUDHOE SAY UNIT· FS·3
GAS FLARING INCIDENT REPORT
August 2002
Page 1
Not required for unplanned events which
are less than or equal to 1 hour
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
o
8/11/2002
0830-1300
1430-2359
TOTAL
196
8/10/2002 0120-0130 40 See attachments See attachments
8/10/2002 0725-0800 40
8/10/2002 1200-1220 308
8/12/2002 0341-0415 107
8/13/2002 0415-0435 29
8/31/2002 0342-0351 53
TOTAL 577
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
. . DATE ·TIME .. VOLUME .. DESCRIPTION OF .JNClDENT& CAUSE.
.. _, 0"" "..m. ,___,. ,,_.... ,m_., "_m...,, -,-"" , ,_"", ._m..."... .. .. .. ..___ ...
8/11/2002 0405-0600 419 See attachments
8/19/2002 1215-1500 444
TOTAL 863
. . ACTIoN Tþ"K~N TO ·e:LIMIl:lATe:CAU.SE ..
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
196
577
863
9/11/2002
4:02 PM
30,796
RQ..\£~~
e\,;~
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
,
2. Àare/Relief Valve
3. Flare/Relief Valve
REPORT NO: 02-0544
BPXA FLARE REPORT
PRUDHOE BAY
DATE: 10 Aug 2002
TIME OF FLARING
Start Stop Duration
01:20 01:30 OHrs 10 Mins
07:25 08:00 OHrs 35 Mins
08:30 13:00 4Hrs 30 Mins
12:00 12:20 OHrs 20 Mins
( 4. Flare/Relief Valve
'\1 ì, i
!N0~1 ' ~ëilJ"'Í~ So. .
~\.J~J-~ ¿:.Jv .¿ h, \~
First Determination of Cause:
1. shutdown 1803 for planned maintenance.
Black
Intermittent Smoke Planned VOLUME
D D ~ 40 MSCF
D D ~ 40 MSCF 3 16S-~F
D D D 125 MSCF
D D ~ 308 MSCF
TOTAL VOLUME 513 MSCF
.{>.'~·'>Ih 4 7 31.{c F
____.. f?-
2. Depressured 1803 suction scrubber and associated piping for maintenance.
3. LPS suction scrubber BESD valve failed open during maintenance on panel. Instrumentation failure
that was not part of job scope.
4. Depressured C train oil vessels for vessel washing as part of vessel inspection.
Action Taken to Stop Flaring:
1. normal stop blowdown volume.
I
2. Depressured piping.
3. Blocked in valve when problem was discovered.
4. Completed depressuring vessels and associated piping.
VVednesday, August 21, 2002
Page 1 of 1
REPORT NO: 02-0548
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 11 Aug 2002
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned
1. Flare/Relief Valve 04:05 06:00 1 Hrs 55 Mins ~ 0 ~
2. Flare/Relief Valve 14:30 23:59 1 Hrs 20 Mins ~ 0 0
TOTAL VOLUME
VOLUME
419 MSCF
71 MSCF
490 MSCF
~(g~J.--to ,~U.')~~rê vJ¿I<:..\L '.....¡.,¡;h.:"k·J 12 :ÚÙ A~ 10, '2<-1",-
First Determination of Cause:
"c:1~~J'CI Oil Train shutdown activities. Depressuring vessels after water/soap wash/draining activities.
2. Nitrogen purging hydrocarbons in C oil train vessels in order to inert vessels for opening and
cleaning/inspection.
Action Taken to Stop Flaring:
1. Completed initial depressuring in preparation to nitrogen dilution purges.
2. Safety required activity.
VVednesday, August 21, 2002
Page 1 of 1
/'
REPORT NO: 02-0549
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 12 Aug 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
03:41 04:15 0 Hrs 34Mins
Black
Intermittent Smoke
D D
Planned
~
VOLUME
107 MSCF
107 MSCF
TOTAL VOLUME
First Determination of Cause:
1. 14B/C Commonline shutdown and depressured to eliminate gas leakage into 'C' OilTrain while it is
down for maintenance. Safety Concern.
(a~£~
Uho<-)
Action Taken to Stop Flaring:
1. Completed depressuring.
VVednesday,August21,2002
Page 1 of 1
.-//
REPORT NO: 02-0550
v
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 13 Aug 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
04:15 04:35 0 Hrs 20Mins
Black
Intermittent Smoke
D D
Planned
~
VOLUME
29 MSCF
29 MSCF
TOTAL VOLUME
First Determination of Cause:
1. 13106 Trim Cooler dispressured to flare for maintenance repair/modification of methanol piping.
Safety precaution.
Action Taken to Stop Flaring:
1. Completed depressuring.
VVednesday,August21,2002
Page 1 of 1
REPORT NO: 02-0598
,,/
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 31 Aug 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
03:42 03:51 OHrs 9Mins
Black
Intermittent Smoke
Planned
D 0
~
VOLUME
53 MSCF
53 MSCF
TOTAL VOLUME
First Determination of Cause:
1. 68 Commonline depressured to flare to enable Corrosion Coupon fitting to be repaired/replaced.
Safety related item.
Action Taken to Stop Flaring:
1. Completed Commonline depressuring.
Tuesday, September 03,2002
Page 1 of 1
FACILITY: FS3
SYSTEM
1. Flare/Relief Valve
~
REPORT NO: 02-0562
SPXA FLARE REPORT
PRUDHOE SAY
DATE: 19 Aug 2002
TIME OF FLARING
Start Stop Duration
12:15 15:00 2 Hrs 45Mins
Black
Intermittent Smoke
o 0
Planned
~
VOLUME
444 MSCF
TOTAL VOLUME . 444 MSCF
First Determination of Cause:
1. Oepressured 7D and 14B/C common lines for maintenance at DS14
Action Taken to Stop Flaring:
1. Completed depressure of common lines.
VVednesday, August 21, 2002
Page 1 of 1
Facility
FLOW STATION 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 09/2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,798
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,870
6. Used for lease operations Fuel 670,434
Assist 5,508
7. Other Lift Gas, Off Field 0
TOTAL items 1 . 7 698,610
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 691,304
11. Transferred to: CCP 33,478,222
Remarks:
I hereby ceothat t~ fOregOi~~ is true and correct to the best of my knowledge.
Signature: O. Â A...... n. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 MC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
September 2002
Page 1
9/2/2002
9/2/2002
9/3/2002
9/4/2002
9/4/2002
9/6/2002
9/6/2002
1100-1110
1445-1450
0700-0710
0030-0035
0055-0100
1510-1550
1730-1735
Not required for unplanned events which
are less than or equal to 1 hour
40 Not required for unplanned events which
60 are less than or equal to 1 hour
1,083
240
155
9
3
TOTAL
1,590
Unplanned Events greater than 1 hour
See attachments
See attachments
TOTAL
o
9/7/2002
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
See attachments
0519-0559
208 See attachments
TOTAL
208
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5.000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
See attachments
TOTAL
o
o
208
o
10/7/2002
1 :29 PM
28,176
REPORT NO: 02-0675
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 27 Sap 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
05:19 05:59 0 Hrs 40 Mins
Black
Intermittent Smoke
Planned
o D
~
VOLUME
208 MSCF
208 MSCF
TOTAL VOLUME
First Determination of Cause:
1. Common lines 15B and 15D depressured to enable valve replacements at DS15. Safety related item.
Action Taken to Stop Flaring:
1. Completed Commonline depressuring.
Tuesday,October01.2002
Page 1 of 1
Facility
FLOW STATION 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 10/2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,667
4. Flared or vented greater than 1 hour 570 ./
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,058
6. Used for lease operations Fuel 810,882
Assist 2,202
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 835,379
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 830,940
11. Transferred to: CCP 30,754,929
Remarks:
I hereby certþ.that t~fOrego:~/s true and correct to the best of my knowledge.
Signature: . a . 1· O. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
570 MCF..:Jß1;2.-
2. Lease Use
MCF
3. Conserv. Purposes
MCF
c~~'~<
I Jj I :>';'/1:> Y
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
October 2002
~Unplanned Events less than or e9ual to 1 hour
DATE . TIME VOLUME . DESCRIPTION OF INCIDEJoIT & CAUSE·
..,.......,.........",.......",....._"..,.......".,.......,.,...,...,..,......",...._,.".......,..,.......,".,......",......".,.......".
1 0/12/2002 1450-1455 60 Not required for unplanned events which
10/12/2002 1800-1830 1,095 are less than or equal to 1 hour
10/12/2002 1935-1940 60
10/12/2002 1950-2000 366
Page 1
TOTAL
1,581
~Unplanned Events greater than 1 hour
DATE TIME. .. VOLUME· DESCRIPTIONOFINCIOENT&CAUSE
10/16/2002 1715-2015 570 See attachments
TOTAL
570
~Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATETII\iIE VOLUME[)ESCF!I~TIØJol.ØFI@I[)ENT&;Ç~USE
10/3/2002 0230-0240 60 See attachments
10/3/2002 0500-0510 20
10/11/2002 1700-1705 3
10/11/2002 1830-1835 3
TOTAL
86
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE. .
See attachments
TOTAL
o
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
570
86
o
TOTAL FLARED VOLUME
24,497
ACTION TAKEN TQ ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
·ACTION TAKEN TO ELIMINATE CAUSE
See attachments
,
ACTION TAKEN TO ELIMINATE CAUSE.
See attachments
.. ACTION TAKEN TO ELIMINATE CAUSE ..
See attachments
11/7/2002
3:17PM
REPORT NO: 02-0695
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 03 Oct 2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
02:30 02:40 OHrs 10 Mins D D ~ 60 MSCF
05:00 05:10 OHrs 10 Mins D D ~ 20 MSCF
TOTAL VOLUME 80 MSCF
First Determination of Cause:
1. Shut down 1804 Vc for waterwash. Normal compressor piping blowdown volume.
2. Instrumentation problem in 1804 Vc panel. While troubleshooting, unit received a ESD command,
causing the compressor piping to be depressured completely.
Action Taken to Stop Flaring:
1. Normal compressor piping blowdown volume.
2. Piping completely depressured.
Friday, October 25, 2002
Page 1 of 1
REPORT NO: 02-0712
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 11 Oct 2002
TIME OF FLARING
SYSTEM Start Stop Duration
1. Controlled Blowdow 17:00 17:05 0 Hrs 5 Mins
First Determination of Cause:
1. 1802 T/C SHUTDOWN FOR MAINTENANCE
Action Taken to Stop Flaring:
1. TRAIN DEPRESSURED AND SECURED
Friday, October 25, 2002
.
Black
Intermittent Smoke
D D
Planned
TOTAL VOLUME
~
VOLUME
3 MSCF
3 MSCF
Page 1 of 1
bp
REPORT NO: 02-0713
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 11 Oct 2002
TIME OF FLARING
SYSTEM Start Stop Duration
1. Controlled Blowdow 18:30 18:35 0 Hrs 5 Mins
Black
Intermittent Smoke
Planned
D D
~
TOTAL VOLUME
First Determination of Cause:
1. 1801 T/C SHUTDOWN AFTER MAINTENANCE WAS COMPLETED ON 1802 T/C
Action Taken to Stop Flaring:
1. TRAIN DEPRESSURED AND SECURED
Friday, October 25, 2002
VOLUME
3 MSCF
3 MSCF
Page 1 of 1
REPORT NO: 02-0726
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 16 Oct 2002
TIME OF FLARING
SYSTEM Start Stop Duration
1. Controlled Blowdow 17:15 20:15 3Hrs OMins
Black
Intermittent Smoke
Planned
D D
D
VOLUME
570 MSCF
570 MSCF
TOTAL VOLUME
First Determination of Cause:
1. 15B COMMONLlNE ·COSASCO· CORROSION COUPON FITTING FAILED DURING
INSPECTION, CAUSING GAS AND HYDROCARBON RELEASE.
Action Taken to Stop Flaring:
1. COMMONLlNE WAS ISOLATED, ALL WELLS SHUT IN AND LINE DEPRESSURED. INSTALLED
AN ISOLATION VALVE WITH CAP.
Friday, October 25,2002
Page 1 of 1
Facility
FLOW STATION 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 11/2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 78
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 19,378
6. Used for lease operations Fuel 936,358
Assist 3,996
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 959,810
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 955,736
11. Transferred to: CCP 28,393,416
Remarks:
I hereby cer2'..t'õ the(OregOing i~;ue and correct to the best of my knowledge.
Signature: ~ . Å..I,~"" 0 A Title: SUPERVISOR
Form 1 0-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
November 2002
Page 1
¡unplanned Events less than or equal to 1 hour
DATE . TIME VOLUME... DESCRIPTION OF INCIDENT "ÇAUSI5 .
11/6/2002 1730-1735 75 Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
75
¡Unplanned Events greater than 1 hour
. DATE TIME · VOLUME
. ACTION TAKEN TO ELIMINATE CAUSE ..
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
DESCRIPTION OFINCU)ENt&CAUSE .
See attachments
o
¡Planned Events Less Than or Equal 1 Hour AND Not Exceedin~ 5000 Met
DATE. . . . . . .. .... TIME· . . . . . VOLUME . . DESCRIPTION OF INCIDENT & CAUSE
11/15/2002 0410-0415 3 See attachments
ACTION TAKEN. TO eLIMINATE: CAUS!: · . . .
See attachments
(
TOTAL
3
ACTION TAKEN TO ELIMINATE CAUSE ....
See attachments
.... .. (
¡Planned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE . TIME ···vOLUMe ... DESCRIPTION OF INCIDENT &.CAUSE. .
See attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5.000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
75
o
3
o
23,452
ACTION TAKEN TO ELIMINATE: CAUSE ... ..
See attachments
12/9/2002
11:29AM
Facility
FLOW STATION 3
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA EASTERN OPERATING AREA-PBU 12/2002
Disposition Volume MCF*
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 457
4. Flared or vented greater than 1 hour 1,768 /'
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 20,025
6. Used for lease operations Fuel 1,013,035
Assist 2,165
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,037,450
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: CGF 1,033,060
11. Transferred to: CCP 30,327,315
Remarks:
I hereby certa.Gt, t foregoinþ is true and correct to the best of my knowledge.
Signature: < J... . "^ 1 , Title: SUPERVISOR
Form 1 0-422 (Revised 4/95)
*Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1 . Safety
17f:;ß
(
2. Lease Use
MCF
3. Conserv. Purposes
MCF
co/,o Þ ~
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - FS-3
GAS FLARING INCIDENT REPORT
December 2002
Page 1
Iunplanned Events less than or equal to 1 hour
DATE TIME "OLUMEPI5~ÇFIII?1'IºNº"'INÇI[)EN1'.BtÇ~LJ~E
12/16/2002 1904-1924 153 Not required for unplanned events which
12/17/2002 0740-0745 3 are less than or equal to 1 hour
~9i'2öõ2'---1752-1830 ....~
12/30/2002 1323-1401 5
TOTAL ~.~ /bl JBß--
ACTION TAKEN TO ELIMINATE CAUSE. . .
Not required for unplanned events which
are less than or equal to 1 hour
Un
1 hour
12/14/2002
12/17/2002
12/29/2002
1555-1705
0415-0555
1640-1745 IV
TOTAL
507 See attachments See attachments
764
497 \~ e~ _ i4.S}-.trt;¿~ €i¡ (WI lie- -f:-rz:ti:-"
¿qö )
.~ ¿<;<;
LV:;.) L- cJß.<'Z-
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME· . VOLUME· DESCRIPTION OF INCIDENT & CAUSE
12/29/2002 1850-1855 3 See attachments
12/30/2002 1600-1603 3
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
6
tPlanned Events Exceedin~ 1 Hour OR Exceeding 5000 Met
DATE TIME· VOLUME . . DESCRIPTION OF INCIDENT & CAUSE. .
See attachments
TOTAL
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5.000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
. .. ACTION TAKEN TO ELIMINATE CAUSE
See attachments
o
1,768
6
o
24,415
1/10/2003
3:37 PM
REPORT NO: 02-0872
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 14 Dee 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
15:55 17:05 1 Hrs 10 Mins
~ D
TOTAL VOLUME
D
Black
Intermittent Smoke
First Determination of Cause:
1. 1801 compressor SID during a calibration of P28S low STV suc pressure.
On a re-start, it SID on high vibration.
Action Taken to Stop Flaring:
1. Re calibrated P28S and re started 1801 compressor.
Thursday, December 26, 2002
Planned
VOLUME
507 MSCF
507 MSCF
Page 1 of 1
bp
REPORT NO: 02-0878
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 17 Dee 2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
04:15 05:55 1Hrs 40 Mins ~ D D 764 MSCF
07:40 07:45 OHrs 5Mins ~ D D 3 MSCF
TOTAL VOLUME 767 MSCF
First Determination of Cause:
1. 1. 0415 hr. 1801 unloaded again for unknown reason. At 0440 hr. 1802 was started. 0500 1802 was
loaded and 1801 tripped. 0503 hr. 1802 tripped.
2. 1802 T/C shutdown while loading 1801 T/C. Normal depressure volume because 1801 was
loaded.
2. 2. 1802 T/C shutdown while loading 1801 T/C. Normal depressure volume because 1801 was
loaded.
Action Taken to Stop Flaring:
1. 1. 1802 was restarted at 0515 hr. and loaded at 0555 hr. 1801 was started at 0545 hr. and idled.
2. 2. 1801 T/C put on line and loaded.
Report No: 02-0878 replaces missing report no. 02-0877
Thursday, January 02, 2003
Page 1 of 1
REPORT NO: 02-0897
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3 DATE: 29 Dee 2002
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 16:40 17:45 1 Hrs 5Mins 0 D D 497 MSC~ 5/"{ (;.
2. Flare/Relief Valve 17:52 18:30 OHrs 38 Mins 0 0 D 290 MSCF ,éV4f-
3. Flare/Relief Valve 18:50 18:55 OHrs 5 Mins D 0 ~ 3 MSCF
TOTAL VOLUME 790 MSCF
First Determination of Cause:
1. 1801 T /C Train ·unloaded" due to undetermined cause. Suspect instrumentation problem. Unit
would not ·reload".
2. 1802 T/C Train "Shutdown" on instrumentation malfunction.
3. 1801 normal shutdown from idle. Preparing to do instrumentation trouble-shooting/repairs.
Action Taken to Stop Flaring:
1. 1802 T /C started and brought online.
2. 1802 T/C restarted. Unit brought back online.
3. Normal shutdown for maintenance trouble-shooting/repairs.
Monday, December 30, 2002
Page 1 of 1
bp
REPORT NO: 02-0899
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: FS3
DATE: 30 Dec 2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
13:23 14:01 OHrs 15Mins ~ 0 0 5 MSCF
16:00 16:03 OHrs 3Mins D D ~ 3 MSCF
TOTAL VOLUME 8 MSCF
First Determination of Cause:
1. Failed start attempts on 1801 Vc due to instrumentation problems.
2. Shut down 1802 Vc after returning 1801 Vc to service.
Action Taken to Stop Flaring:
1. Normal compressor "failed start" volumes (5 failed starts).
2. Normal compressor blowdown volume.