Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 01/2002
GATHERING CENTER 1
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 13,647 /'
4. Flared or vented greater than 1 hour 0 /
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 28,113
6. Used for lease operations Fuel /
1,001,996
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,043,756
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 70,191,618
Remarks:
I hereby cel) :hat thetregOing ,iþtrue and correct to the best of my knowledge.
Signature: .c\ _ Å.A A_A. ',. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure 0 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
JANUARY, 2002
Page 1
tunplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTIOWOFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
1/1/2002 0709-0722 90 Not required for unplanned events which Not required for unplanned events whi
1/4/2002 2311-2325 49 are less than or equal to 1 hour are less than or equal to 1 hour
1/6/2002 2039-2045 208
1/9/2002 1650-1658 83
1/9/2002 2340-2355 156
1/11/2002 1751-1834 486 Intermittent
1/12/2002 1832-1838 208
1/15/2002 0528-0534 42
1/15/2002 2224-2314 868
1/16/2002 0201-0108 208
1/16/2002 0455-0525 188
1/19/2002 2219-2226 486
1/20/2002 1110-1119 313
1/23/2002 0956-1055 6,433
1/24/2002 2150-2154 33
1/25/2002 1527-1611 125 Intermittent
1/25/2002 1719-1803 275
1/27/2002 1304-1330 542
1/28/2002 1003-1046 597
1/28/2002 1551-1630 1 ,165
1/29/2002 1421-1444 240
1/29/2002 1630-1641 69
1/29/2002 1850-1906 200
1/30/2002 0718-0814 583
TOTAL
13,647
¡Unplanned Events greater than 1 hour
DATE TIME VOLUME
TOTAL
DESCRIPTION OF INCIDENT & CAUSE
See attachments
o
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
tPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
tPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour & not
exceeding 5.000 MCF
Planned Events> 1 hour and
exceeding 5.000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
13,647
o
o
o
GPB Flaring incident
Subject: GPB Flaring incident
Date: Sat, 26 Jan 2002 00:00:31 -0600
From: "Bolkovatz, Mike J" <BolkovMJ@BP.com>
To: "Steve McMains (E-mail)..<steve_mcmains@admin.state.ak.us>
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Michael Bo1kovatz, GPB Prod Optim Team Leader, 907-659-5566
This note is to inform you of a flaring incident which occurred on January
23, 2002. At 09:52, GC3 started flaring
because CGF booster compressors 1801, 1802, and 1857 shutdown. At 09:56, the
flare relief valve at GC1 opened.
Booster 1802 shutdown due to an exhaust gas temperature problem. Then,
booster 1801 shutdown because of
vibration problems when 1802 shutdown. Then, booster 1857 shutdown because
of a fuel control problem. The
WOA immediately started reducing productionrates and shutin 1141 MMSCF. The
EOA immediately started
reducing production and shut in 1000 MMSCF. This gas cut was enough to lower
the gas transit header pressure
to stop flaring. GCl flared a total of 6,433 MSCF for 59 minutes, and GC3
flared a total of 7,697 MSCF for 1 hr,
8 minutes. Due to the significant amount of production (approximately 60
wells) that had to be shutin in order to
reduce the pressure enough to close the flare relief valve, the flaring
event at GC3 lasted over 1 hr. Because of the
gas piping hydraulics, the pressure at GCl was reduced sooner and they were
able to stop flaring in just under 1 hr.
Please don't hesitate to call me with any questions.
Michael Bolkovatz
GPB Production Optimization TL
659-5566
1 of 1
1/26/028:33 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 02/2002
GATHERING CENTER 1
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 19,720
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 28,402
6. Used for lease operations Fuel 944,717
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 992,839
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 62,490,152
Remarks:
I hereby cefj'.tð thtoregOing i true and correct to the best of my knowledge.
Signature: ....{ . 1 of ^^" r 0... Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
100.00%
640150
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Page 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
FEBRUARY, 2002
unPlanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
2/1/2002 1322-1354 667 Not required for unplanned events which Not required for unplanned events whi
2iii2ûû2 i4i9-1448 705 are less than or equal to 1 hour are less than or equal to 1 hour
2/3/2002 1409-1425 167
2/4/2002 1103-1202 2,049
2/5/2002 1643-1653 139
2/7/2002 1356-1433 95 Intermittent
2/13/2002 1711-1716 347
2/17/2002 0108-0119 764
2/18/2002 0417-0424 486
2/18/2002 0539-0546 486
2/20/2002 1124-1130 146
2/22/2002 0448-0506 1 ,250
2/22/2002 0837-0843 146
2/22/2002 0857-0903 146
2/22/2002 0915-0926 840
2/22/2002 1027-1036 625
2/24/2002 1352-1442 10,472
2/24/2002 1403-1420 190
TOTAL
19,720
~Unplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
o
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
TOTAL
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO EUMINATE CAUSE
See attachments
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events> 1 hour or 0
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME 48,122
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2002
I Volume MCF"
GATHERING CENTER 1
Disposition
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 12,526
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 33,215
6. Used for lease operations Fuel 1,013,965
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,059,706
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 69,323,961
Remarks:
I hereby ce".t~t tnfOregOingJltrue and correct to the best of my knowledge.
Signature: . '1 A .. ^"'^ I, Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
MARCH, 2002
Page 1
JUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
3/2/2002 1724-1731 486 Not required for unplanned events which
3/4/2002 0900-0916 222 are less than or equal to 1 hour
3/11/2002 2123-2221 5,035
3/12/2002 0020-0112 4,514
3/16/2002 1652-1702 694
3/17/2002 0715-0720 69
3/17/2002 0755-0820 608
0321-02 1509-1525 122
3/22/2002 2047-2052 42
3/24/2002 2036-2042 46
3/30/2002 0140-0213 688
TOTAL
12,526
lunplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT & CAUSE
See attachments
o
TOTAL
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events whil
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
12,526
o
o
o
TOTAL FLARED VOLUME
45,741
I
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 04/2002
GATHERING CENTER 1
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 6,158
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 32,955
6. Used for lease operations Fuel 983,821
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,022,934
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 66,496,295
Remarks:
I hereby certV~ITe tegOing is tr~ö and correct to the best of my knowledge.
Signature: . . 1. A ^". .h Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
April 2002
Page 1
lunplanned Events less than or equal to 1 hour
DATE TIME' VOLUME 'DESCFtIPTIONOFfNc:IOENT"&!CAU$e
4/1/2002 1644-1651 180 Not required for unplanned events which
4/2/2002 0040-0105 260 are less than or equal to 1 hour
4/7/2002 2336-2400 250
4/8/2002 0000-0009 75
4/8/2002 0150-0230 1,250
4/8/2002 0456-0512 225
4/8/2002 0847-0913 361
4/1 0/2002 1417-1423 417
4/12/2002 1617-1624 49
4/12/2002 2015-201 g 22
4/12/2002 2204-2209 28
4/13/2002 1000-1007 49
4/17/2002 0250-0256 33
4/18/2002 0941-0954 45
4/21/2002 0829-0851 275
4/21/2002 2236-2254 125
4/23/2002 0529-0536 486
4/24/2002 0310-0318 556
4/24/2002 0337-0344 486
4/24/2002 1136-1206 313
4/25/2002 0711-0718 73
4/25/2002 1039-1125 479
4/26/2002 1535-1547 83
4/27/2002 0323-0332 38
TOTAL
6,158
'unplanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT &! CAUSE
See attachments
TOTAL
o
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
'Planned Events Less Than or Equal 1 Hour AND Not Exceedinp 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events whi,
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
'Planned Events ExceedinQ 1 Hour OR Exceeding 5000 Mct
DATE . TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
o
o
o
TOTAL FLARED vOLUME
39,113
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
10perator IField(s) IMonth/Year of Disposition
I BP EXPLORATION, ALASKA IWESTERN OPERATING AREA-PBU I OS/2002
GATHERING CENTER 1
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. ( q'5~
~
4. Flared or vented greater than 1 hour 5450
(Supplemental report required - See 20 AAC 25.235) ~
5. Pilot and Purge 34,152
6. Used for lease operations Fuel 957,277
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 . 7 998,831
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 67,160,825
Remarks:
I hereby certD ~Õ~ thrOregOing is l~e and correct to the best of my knowledge.
Signature: 'J. 1 .J . A Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
,
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety q45D MCF ð'.ß./'2.-
2. Lease Use MCF
3. Conserv. Purposes MCF
cb;~ jL
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC·1
GAS FLARING INCIDENT REPORT
May 2002
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/3/2002 0307-0317 350 Not required for unplanned events which
5/3/2002 2219-2224 175 are less than or equal to 1 hour
5/4/2002 1037 -1046 469
5/9/2002 1202-1210 83
5/9/2002 1257 -1302 52
5/12/2002 0937 -1003 90
5/12/2002 1040·1102 76
5/13/2002 0541·0545 14
5/13/2002 0623-0634 38
5/14/2002 1109-1115 63
5/14/2002 1248·1259 115
5/19/2002 1458·1508 175
5/22/2002 0851-0858 53
5/22/2002 0944-0953 38
5/24/2002 1732-1748 133
5/27/2002 2151-2156 28
5/29/2002 1742-1815 3,900
Page 1
TOTAL
5,852
unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
5/29/2002 1815-1938 1 ,550 See attachments
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
1,550
¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL
5,852
1,550
o
o
TOTAL FLARED VOLUME
41,554
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
6/6/2002
1:02PM
REPORT NO: 02-0334
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 29 May 2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
17:42 18:15 OHrs 51 Mins D D D 3,900 MSCF
18:15 19:38 1 Hrs 23 Mins D D D 1,550 MSCF
TOTAL VOLUME 5,450 MSCF
First Determination of Cause:
1. High gas transit line pressure caused by CGF compressor problems due to 1885 Tandem shutdown
when 1801 & 1802 Boosters were unloaded for maintenance.
2. Sk-18 IP compressor loading problem associated with suction knockout drum high pressure.
Action Taken to Stop Flaring:
1. WOA reduced production rates equaling 350 mmscfd. EOA reduced production rates equaling 800
mmscfd. Wells were shut-in or choked back starting at 1735 hours.
2. Reloaded compressor
Sunday, June 02, 2002
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 06/2002
GATHERING CENTER 1
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 10,476
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 33,068
6. Used for lease operations Fuel 884,184
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 927,728
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 65,177,695
Remarks:
I hereby ceU~ot t~ fOregOi~] is true and correct to the best of my knowledge.
Signature: . 1 A""'" It Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC·1
GAS FLARING INCIDENT REPORT
June 2002
Page 1
unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
6/2/2002 0717-0752 340 Not required for unplanned events which
6/2/2002 1409-1416 97 are less than or equal to 1 hour
6/6/2002 1137 -1152 260
6/8/2002 0824·0906 1,458
6/11/2002 0551-0556 35
6/13/2002 1641-1657 222
6/14/2002 2043-2050 486
6/14/2002 2052-2059 486
6/15/2002 1057-1128 431
6/15/2002 1549-1608 198
6/15/2002 1801-1823 2,292
6/20/2002 0405-0410 21
6/21/2002 1522-1543 94
6/21/2002 2239-2300 146
6/26/2002 0049-0125 1,500
6/28/2002 0327-0346 1,319
6/29/2002 0307-0320 903
6/29/2002 0335-0344 188
TOTAL
10,476
~Unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL
o
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOL.UME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
10,476
o
o
o
43,544
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
7/9/2002
10:46 AM
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 07/2002
GATHERING CENTER 1
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,867
4. Flared or vented greater than 1 hour 5,430 L./
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 30,706
6. Used for lease operations Fuel 1,058,260
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,096,263
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 50,527,292
Remarks:
I hereby ce" t'ö, th~regOing i~ prue and correct to the best of my knowledge.
Signature: . . ~ A.III'U, ø. Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1 . Safety
5)430 MCF ðß,.e...
2. Lease Use
MCF
3. Conserv. Purposes
MCF
~~.q:~r& ~.
Commissio~er -0
9f(~\~
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
July 2002
Page 1
Unplanned Events less than or equal to 1 hour
7/2/2002
7/10/2002
7/14/2002
7/14/2002
7/15/2002
7/22/2002
7/24/2002
7/25/2002
1214-1234
1111-1142
0422-0444
0807-0832
1703-1726
0839-0853
1726-1750
0043-0110
208 Not required for unplanned events which
350 are less than or equal to 1 hour
153
260
240
39
167
450
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
1,867
7/14/2002
7/16/2002
7/16/2002
1527-1753
0710-0847
1015-1316
2,535 See attachments
1,010
1,885
See attachments
TOTAL
5,430
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
See attachments
o
See attachments
TOTAL
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
See attachments
o
See attachments
TOTAL
1,867
5,430
o
o
8/12/2002
2:42 PM
38,003
REPORT NO: 02-0441
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1 DATE: 14 Jut 2002
TIME OF FLARING Black
SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME
1. Flare/Relief Valve 04:22 04:44 OHrs 22 Mins 0 0 0 153 MSCF
2. Flare/Relief Valve 08:07 08:32 OHrs 25 Mins 0 0 0 260 MSCF
3. Flare/Relief Valve 15:27 17:53 2Hrs 26 Mins 0 0 0 2,535 MSCF
TOTAL VOLUME 2,948 MSCF
First Determination of Cause:
1. Due to rising transit line pressure, D bank flare valve opened.
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 4°F.
3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 5°F.
Action Taken to Stop Flaring:
t\. 1. Three wells equal to 100mmscfpd gas rate, chokes were reduced to minimum. Flaring stopped.
~duced production rates equaling 130 mmscfd. Wells were shut-in or choked back starting at
_. ~urs.
3. WOA reduced production rates equaling 250 mmscfd. EOA reduced production rates equaling 280
mmscfd. Wells were shut-in or choked back starting at 1330 hours.
Monday, July 22, 2002
Page 1 of 1
REPORT NO: 02-0449
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 16 Jul2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
07:10 08:47 1 Hrs 37 Mins 0 0 0 1,010 MSCF
10:15 13:16 3Hrs 1 Mins ~ 0 0 1 ,885 MSCF
TOTAL VOLUME 2,895 MSCF
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 1 O°F. 50-60
2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 10°F. 70-82
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in 20 wells equaling 180 mscfd. EOA reduced production
rates s equaling 375 mmscfd. Wells were shut-in or choked back starting at 0615 hours.
2. WOA reduced production rates equaling 600 mmscfd. Wells were shut-in or choked back starting
at 0830 hours.
Monday, July 22, 2002
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 08/2002
GATHERING CENTER 1
Disposition
Volume MCF"
0
0
6,416
./
8,162
35,707
1,676,775
0
0
1,727,060
0
0
0
57,562,135
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
4. Flared or vented greater than 1 hour
Su plemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
Fuel
Assist
7. Other
Lift Gas, Off Field
TOTAL items 1 - 7
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
true and correct to the best of my knowledge.
Title: SUPERVISOR
Signature:
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name
Code
Percent
PRUDHOE
640150
100.00%
1. Safety
CD I b Z-MCF :5ßt2-
I
2. Lease Use
MCF
3. Conserv. Purposes
MCF
~ %'/oy
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Page 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC·1
GAS FLARING INCIDENT REPORT
August 2002
Unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION?O¡::JNCIt:>J;Nl"&' CAUSE
8/8/2002 0146-0206 194 Not required for unplanned events which
8/9/2002 2324-2400 525 are less than or equal to 1 hour
8/10/2002 0000-0014 175
8/10/2002 0740-0810 417
8/10/2002 1615-1628 108
8/11/2002 1321-1345 200
8/18/2002 0353-0445 1,083
8/19/2002 1425-1438 108
8/23/2002 1050-1058 56
8/25/2002 1508-1522 39
8/27/2002 0740-0805 174
8/27/2002 0935-0948 81
8/28/20021108-1148 2,083
8/29/2002 2005-2036 323
8/29/2002 2008-2040 600
8/30/2002 0307-0316 250
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
J f'Jd- e..w4~ \t\~ -k, JJ.t/"rIA-l."\<? l f
~~ r~~ ~ le~_'~ i ~
~~
6,416
~UnPlanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
8/3/2002 1020-2348 4,996 See attachments
8/4/2002 0430-2352 3,166
TOTAL
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
8,162
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE .. TIME VOI£UM£ . DESCRIPTIQli?O¡::'fNCIt:>£NT'&CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIt:>ENT"& CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
ACTION TAKEN TO EUMINATE CAUSE
See attachments
TOTAL
6,416
8,162
o
o
50,285
9/1112002
2:52 PM
REPORT NO: 02-0516
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 03 Aug 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
10:20 23:48 13 Hrs 28 Mins
Black
Intermittent Smoke
o 0
Planned VOLUME
o 4,996 MSCF
TOTAL VOLUME 4,996 MSCF
First Determination of Cause:
1. Sk-18 IP compressor K-107 shut down because of a problem associated with the newly installed
discharge valve malfunction.
Action Taken to Stop Flaring:
1. This problem was actually discovered during a plant restart operation. K-107 was started as
normal during this plant re-start, and a problem was discovered as the plant rate was brought up,
and after several hours of trouble shooting effort, Le., checking for valves in wrong position, cooler
bay hydrates, etc, the problem was isolated to a newly installed discharge valve which was
inadvertently installed in the closed position
(confirmed by temperature differential and X-ray readings). A plan was formulated and valve reps,
as well as local maintenance techs, where used to remove the actuator and re-position it so that the
discharge could then function properly. During this process, we sorted highest GOR wells flowing to
GC-1 and reduced gas rate through plant to minimize gas flaring. Valve actuator was repositioned,
allowing valve to fully open, K107 began to move gas and flaring stopped.
VVednesday,August21,2002
Page 1 of 1
REPORT NO: 02-0518
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 04 Aug 2002
SYSTEM
1. Flare/Relief Valve
TIME OF FLARING
Start Stop Duration
04:30 23:52 19 Hrs 29 Mins
Black
Intermittent Smoke
D D
Planned VOLUME
D 3,166 MSCF
TOTAL VOLUME 3,166 MSCF
First Determination of Cause:
1. Sk-18 LP compressor shut down because of a problem associated with temperature of the LP gas
with rates cut. The molecular components of said gas will not allow the heavy ends to fall out and
allow the compressor to bite. Flaring with assist gas thru V-136 to prevent black smoke.
Action Taken to Stop Flaring:
1.
VVednesday,August21,2002
Page 1 of 1
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 09/2002
GATHERING CENTER 1
Disposition Volume MCF"
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 1,466
4. Flared or vented greater than 1 hour 58,650 ;/
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 35,288
6. Used for lease operations Fuel 804,091
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 899,495
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 67,901,284
Remarks:
I hereby ce1J ot t~ foregoirJ is true and correct to the best of my knowledge.
Signature:. .0 J A"'" Ú Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety LISD MCF .$~
2. Lease Use 5'7 :pD MCF Jig¡2-
I
3. Conserv. Purposes MCF
J ð{( ~AQ 'y
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOEBAYUNIT-GC~
GAS FLARING INCIDENT REPORT
September 2002
Page 1
\ l~nplannedEventslessthanorequal to 1, ~~ur
\~ 'ii"¡iºI~,ª¡iil!iiii¡ii¡iiil!i¡,!!il!iilin;!M,ªI¡ii¡'¡iiiii'ii¡iili~~~~Mr;¡"!!!;¡¡iº,ª~C;;~I~rl~~III~I'~C;;Iºr;~r'~I(Þ~~$1!P
l!!:Î,,¡e,J "~ 9/4/2002 1311-1327 ~.9)Jot required for unplanned eventsll'\lhi~h
I~ 9/7/2002 0544-0619 365 are less than or equal to 1 hour
9/7/2002 1456-1517 150
:~~~~~~~~ ~:~;~~~~~ ~ ~ì'p/()fkck¡ ~
9/28/2002 1827 -1858 538
tb1" \
;4thìt;-:t
TOTAL
Unplanned Events greater th n
9/4/2002
9/10/2002
1457-1629
0849-1003
\\~\
-...J:~ )2JI~/u"L-
1 ,150 See attachments
-!)0:!.:.~ (û~';r (Ö(pC .1.1 '~<t
TOTAL 5~ J~ì7
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DArE 'TIME ' , , , 'VOLUME' DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
, ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
See attachments
-.ßI~ 1~(lclo"C-
, ACTION TAKEN TO ELlMINA,Tr; CAUSE
See attachments
J
Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct
, DATE TIME"", VOLUME" DESCRIPTION OF INCI()ENT& CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
l \ q,q
~C:¡17
CJg~
I z( ,~/ ()~
~
o
o
95,404
, ACTION TAKEN TO ELIMINATE CAUSE
See attachments
10/4/2002
2:31 PM
REPORT NO: 02-0609
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 04 Sep 2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
13:11 13:27 OHrs 16 Mins 0 0 0 100 MSCF
14:57 16:29 1 Hrs 32 Mins 0 0 0 1,150 MSCF
TOTAL VOLUME 1 ,250 MSCF
First Determination of Cause:
1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient
temperature increased by 20°F (55°F).
"'-.\ 2. High ambient temperature swings resulted in high transit line pressure and flaring. Production cuts
did not stop flaring until production bank was shutdown. Ambient temperature increased by 20°F
(65°F) and transit line was 20psi over normal.
Action Taken to Stop Flaring:
1. WOA reduced production rates equaling 100 mmscfd. Wells were shut-in or choked back starting at
1315 hours.
2. WOA reduced production rates and shut-in many wells equaling 450 mmscfd. EOA reduced
production rates and shut-in many wells equaling 140 mmscfd. Wells were shut-in or choked back
starting at 14:45 hours.
Wednesday, September 25,2002
Page 1 of 1
REPORT NO: 02-0638
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 10 Sep 2002
SYSTEM
1. Flare/Relief Valve
2. FlarelRelief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
08:37 08:53 OHrs 16 Mins D D D 167 MSCF
08:49 10:03 1 Hrs 14 Mins D D D 57,500 MSCF
TOTAL VOLUME 57,667 MSCF
First Determination of Cause:
1. In preperation of GC1 Annex flare tip test, CCP backed down to raise gas transit line pressure,
which caused flaring.
2. GC1 Annex flare capacity test to test recent modifications to the flare system. Notified AOGCC of
test for verbal approval.
Action Taken to Stop Flaring:
1. GC1 Annex started flare test and transit line pressure decreased.
2. Test completed and rates returned to normal
Wednesday, September 25,2002
Page 1 of 1
GPB Flaring Incidents
Subject: GPB Flaring Incidents
Date: Tue, 10 Sep 2002 22:59:59 -0500
From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com>
To: 'steve _ mcmains@admin.state.ak.us'
CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>,
"Pfeiffer, Jim A" <PfeiffJA@BP.com>,
"GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>,
"GPB, Environ TL" <GPBEnvironTL@BP.com>,
"GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com>
>
>
>
>
>
> Leader, 907-659-5566
>
To:
Steve McMains, AOGCC
steve mcmains@admin.state.ak.us
907-793-1241, fax 907-276-7542
From:
Michael Bolkovatz, GPB Prod Optim Team
As we discussed yesterday, an extended flare
incident occurred during field testing of the newly installed flare tip at
the GC1 Annex. The test was to determine if the flare is actually capable of
operating at its design conditions to ensure safe operations. The test
started at 08:49 and lasted until 10:03 and a total volume of 57,500 MSCF
was flared. The test was successful; ie, the flare performed up to design
specifications.
>
> hesitate to call me.
>
If you require additional information, please don't
Michael Bolkovatz
GPB Production Optimization TL
659-5566, 659-4472
Facility
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) MonthNear of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 10/2002
GATHERING CENTER 1
Disposition Volume MCP
1. Sold 0
2. Reinjected 0
3. Flared or vented less than 1 hour. 6,794
4. Flared or vented greater than 1 hour 0
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge 37,468
6. Used for lease operations Fuel 964,481
Assist 0
7. Other Lift Gas, Off Field 0
TOTAL items 1 - 7 1,008,743
8. NGL gas equivalent produced 0
9. Purchased gas 0
10. Transferred from: 0
11. Transferred to: CCP 70,256,123
Remarks:
I hereby cert~ that t1\...foregoin? is true and correct to the best of my knowledge.
Signature: () J.. j ^'" ~l Title: SUPERVISOR
Form 10-422 (Revised 4/95)
"Indicate contribution of each pool to total.
Pool Name Code Percent
PRUDHOE 640150 100.00%
1. Safety
MCF
2. Lease Use
MCF
3. Conserv. Purposes
MCF
Commissioner
Date
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC-1
GAS FLARING INCIDENT REPORT
October 2002
Page 1
¡unplanned Events less than or equal to 1 hour
DATE TIME VOI.1lJME DESCRIPTION OF INCIDEN't &'CAUSE
10/1/2002 0640-0648 28 Not required for unplanned events which
10/1/2002 1957-2006 625 are less than or equal to 1 hour
10/2/2002 2055-2104 625
10/2/2002 2224-2254 417
10/2/2002 2314-2319 42
10/2/2002 2315-2324 625
10/4/2002 0707-0751 300
10/5/2002 0648-0655 50
10/6/2002 1328-1350 229
10/6/2002 1735-1755 167
1 0/7/2002 0517-0611 385
10/7/2002 1912-1924 108
10/8/2002 1055-1106 764
10/8/2002 1258-1327 201
1012-02 1117-1146 302
10/20/2002 0913-0920 243
10/27/2002 0000-0010 139
10/29/2002 0903-0934 323
10/29/2002 1145-1231 415
10/29/2002 1323-1346 160
10/30/2002 2302-2332 438
10/31/2002 0629-0634 208
TOTAL
6,794
¡UnPlanned Events greater than 1 hour
DATE TIME VOLUME
DESCRIPTION OF INCIDENT" CAOSE
See attachments
TOTAL
o
¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
¡Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
See attachments
TOTAL 0
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
o
o
o
44,262
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
11/7/2002
2:58 PM
Facility
GATHERING CENTER 1
Disposition
1. Sold
2. Reinjected
3. Flared or vented less than 1 hour.
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
I Operator I Field(s) I MonthNear of Disposition
I BP EXPLORATION, ALASKA IWESTERN OPERATING AREA-PBU 11/2002
Volume MCP
"Indicate contribution of each pool to total.
o
Pool Name
Percent
Code
o
PRUDHOE
640150
100.00%
9,481
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
5. Pilot and Purge
6. Used for lease operations
7. Other
8. NGL gas equivalent produced
9. Purchased gas
10. Transferred from:
11. Transferred to: CCP
Remarks:
TOTAL items 1 - 7
I hereby ce
Signature:
Form 10-422 (Revised 4/95)
true and correct to the best of my knowledge.
Title: SUPERVISOR
Fuel
Assist
4,797
36,468
908,702
o
Lift Gas, Off Field
o
959,448
1. Safety
4:t<q-r MCF J:"I?-
o
MCF
2. Lease Use
o
3. Conserv. Purposes
MCF
o
Gm~OuU<~
CommisU>ner
J~t -r/(J r
Date
63,020,248
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 10 Nov 2002
SYSTEM
TIME OF FLARING
Start Stop Duration
00:36 00:45 0 Hrs 9 Mins
Black
Intermittent Smoke
VOLUME
1. Flare/Relief Valve
REPORT NO: 02-0789
Planned
o
o
o
o
~wJ.S ?
c::4r-fL. ~ ,.-t'ç 0, 1L5V,3~ ¡
o ,\. ~~~ ~-4' . J
First Determination of Cause:
1. High ambient temperaturr~... resulted in flaring and required cuts in production. Ambient
temperature increased t::('I2°F. \
¡
2. High ambient temperatµre swings resulted in flaring and required cuts in production. Ambient
temperature increased!by 2°F.
3. CGF swapping Tande~essors, L TS-3 out of service.
2. Flare/Relief Valve
00:51 01 :02
OHrs 11 Mins
3. Flare/Relief Valve
01 :51 02:39
o Hrs 48 Mins
4. Flare/Relief Valve
05:42 09:38
3 Hrs 56Mins
o
o
o
o
o
o
o
o
63 MSCF
76 MSCF
.....,~'--,
( 500 MS~~j/)
3,697 MSCF
4,336 MSCF
\Y
-h ,~ I
€f) ~f..rJ
(/'Ir.:-
Q, e-v~
I (¡vJ{}z.. '
q t Zð J q,'¿¡D~
/'IA
é> /~ )
TOTAL VOLUME
4. Ambient temperature increasing along with changing out high GOR wells
Action Taken to Stop Flaring:
1. WOA reduced production rates and choked back 4 wells equaling 34 mmscfd. Wells were shut-in or
choked back starting at 00:36 hours.
2. WOA reduced production rates and choked back 4 wells equaling 34 mmscfd. Wells were shut-in or
choked back starting at 00:51 hours.
3. No response taken as this was deemed to be of short duration. CGF would flare to help keep transit
gas line pressure from getting high.
4. WOA reduced production rates and moved two wells equaling 60 mmscfd. Wells were shut-in or
choked back starting at 0536 hours.
Continued cutting 4 more equaling another 90mm flares finally closed. Checking setpoints on annex
vessel and backpressure valve
Tuesday, November 26, 2002
Page 1 of 1
REPORT NO: 02-0808
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1 DATE: 16 Nav 2002
TIME OF FLARING
SYSTEM Start Stop Duration Intermittent
1. Flare/Relief Valve 00:10 00:58 OHrs 48 Mins D
2. Flare/Relief Valve 02:10 03:13 1 Hrs 3Mins D
3. Flare/Relief Valve 11:41 12:12 OHrs 31 Mins D
Black
Smoke Planned VOLUME
D D 500 MSCF
D D 1,100 MSCF
D D (:~,306 ~.~~~.... ...
TOTAL VOLUME 5,906 MSCF
he}(v
.f.;v'tJ -t..r
...:
>J~~
First Determination of Cause:
1. Increasing ambient temperature resulted in flaring and required cuts in production. Ambient
temperature increased by 3°F.
2. Increasing ambient temperature resulted in flaring and required cuts in production. Ambient
\.~ . temperature increased by 10°F.
~<t<.' ~
~.. 1.;,?(( 3. H~h gas transit line pressure caused by CGF compressor problems due to PSM testing, MI
~ ~- L/mpressor shut down and backed up L TS 1,2&3.
C'(è;
v ~(Þ
~1/ .,;)) Action Taken to Stop Flaring:
~~ ~... " 1. WOA reduced production rates and shut-in 4 wells equaling 60 mmscfd. EOA reduced production
~ rates equaling 90 mmscfd. Wells were shut-in or choked back starting at 0010 hours.
2. WOA reduced production rates equaling 300 mmscfd. EOA reduced production rates equaling 200
mmscfd. Wells were shut-in or choked back starting at 0115 hours.
3. WOA reduced production rates and shut-in 22 wells equaling 375 mmscfd. EOA reduced production
rates and shut-in 15 wells equaling 500 mmscfd. Wells were shut-in or choked back starting at
11:44 hours.
Tuesday, November 26, 2002
Page 1 of 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT· GC-1
GAS FLARING INCIDENT REPORT
November 2002
Page 1
IUnplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
11/9/2002 2153-2206 90 Not required for unplanned events which
11/9/2002 2227-2244 177 are less than or equal to 1 hour
11/10/2002 0036-0045 63
11/10/2002 0051-0102 ~ '
11/10/2002 0151-0239 500,)--> -h€c'1-Ío CQç:: <A..,e,.~;- ,
11/11/2002 1319-1329 ~ vi cl<JJ~~.. >\ hf2...
11/12/2002 2037-2121 306
11/16/2002 0010-0058 ~/
11/16/2002 1141-1212 . ,3'ö6 . ;:>
11/17/2002 0806-0837 . , 4
11/24/2002 2223-2230 97
11/30/2002 1619-1628 213
ACTION TAKEN TO ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
~
f, e¿i ~ C G-F .eN-i...*
vJI ct.(,v~~ > I ~
9~
L.ln-f
6'( J I""- .
A
::ß? -z{ -z;¡f o-z-
TOTAL
lunplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
11/10/2002 0542-0938 3,697 See attachments
11/16/20020210-0313 1,100
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
(¥i.V'~~)
4,797 ,+ %0'" "'", 1(,03 µ.eç.
3Ble jZ(27{v~
TOTAL
Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met
DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
4,797
o
o
12/9/2002
11:10 AM
TOTAL FLARED VOLUME
50,746
GATHERING CENTER 1
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
Operator Field(s) Month/Year of Disposition
BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 12/2002
Facility
Disposition
Volume MCF"
"Indicate contribution of each pool to total.
1. Sold
o
Pool Name
Code
Percent
2. Reinjected
o
PRUDHOE
640150
100.00%
3. Flared or vented less than 1 hour.
9,552
4. Flared or vented greater than 1 hour
(Supplemental report required - See 20 AAC 25.235)
3,438
5. Pilot and Purge
37,465
6. Used for lease operations
Fuel
Assist
974,536
o
7. Other
Lift Gas, Off Field
o
TOTAL items 1 - 7
1,024,991
1. Safety
3,4-3ß MCF -Y3P--
8. NGL gas equivalent produced
o
2. Lease Use
MCF
9. Purchased gas
o
3. Conserv. Purposes
MCF
10. Transferred from:
o
J-!tO!03
Date
11. Transferred to: CCP
72,821,544
Signature:
Form 10-422 (Revised 4/95)
is true and correct to the best of my knowledge.
Title: SUPERVISOR
Note: All volumes must be corrected to pressure of 14.65
psia and to a temperature of 60 degrees F. Report due by
the 20th of the month following the month of disposition.
Authority 20 AAC 25.235.
Remarks:
REPORT NO: 02-0894
BPXA FLARE REPORT
PRUDHOE BAY
FACILITY: GC1
DATE: 25 Dec 2002
SYSTEM
1. Flare/Relief Valve
2. Flare/Relief Valve
TIME OF FLARING Black
Start Stop Duration Intermittent Smoke Planned VOLUME
11:59 12:18 OHrs 19 Mins 0 0 0 1,319 MSCF
13:25 16:10 2Hrs 45 Mins 0 0 0 3,438 MSCF v
TOTAL VOLUME 4,757 MSCF
First Determination of Cause:
1. LPS compressor K-7001 shut down because of control/instrumentation failure associated with a
faulty pic
2. LPS compressor K-7001 & K-7001shut down because of control/instrumentation failure associated
with a faulty PLC/Power supply
Action Taken to Stop Flaring:
1. WOA reduced production rates and shut-in 14 wells equaling 200 mmscfd. Wells were shut-in or
choked back starting at 12:00 hours.
2. WOA reduced production rates and shut-in all LP wells equaling 400 mmscfd. Wells were shut-in or
choked back starting at 11 :59 hours.
Monday, December 30,2002
Page 1 of 1
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT - GC·1
GAS FLARING INCIDENT REPORT
December 2002
Page 1
unplanned Events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTIONOFINCIDENT<&CAUSE
12/2/2002 0144-0153 625 Not required for unplanned events which
12/3/2002 2308-2312 31 are less than or equal to 1 hour
12/3/2002 2330-2400 3,958
12/4/2002 1729-1742 108
12/4/2002 0000-0012 833
12/8/2002 1652-1658 417
12/11/2002 0329-0345 78
12/12/2002 2302-2315 217
12/13/2002 0248-0255 243
12/17/2002 2045-2055 76
12/20/2002 1723-1745 115
12/21/2002 1419-1428 94
12/23/2002 0712-0730 250
12/24/2002 0739-0800 146
12/24/2002 1412-1424 83
12/25/2002 1159-1218 1,319
12/29/2002 0338-0344 417
12/31/2002 0651-0659 56
12/31/2002 1225-1232 486
TOTAL 9,552
unplanned Events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
12/25/2002 1325-1610 3,438 See attachments
ACTIONTAKEN·TO·ELIMINATE CAUSE
Not required for unplanned events which
are less than or equal to 1 hour
TOTAL
3,438
Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
JPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf
DATE TIME VOLUME DESCRIÞ110NOf'INCIDENT & CAUSE
See attachments
TOTAL 0
ACTION TAKEN TO EUMINATECAUSE
See attachments
Unplanned Events < 1 Hour
Unplanned Events> 1 Hour
Planned Events < 1 hour and not
exceeding 5,000 MCF
Planned Events> 1 hour or
exceeding 5,000 MCF
Pilot Purge
Assist
TOTAL FLARED VOLUME
TOTAL
9.552
3,438
o
o
50,455
ACTION TAKEN TO ELIMINATE CAUSE
See attachments
1/10/2003
3:17PM