Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU GC 1 / BP Exploration STATE OF AIASKA AOGCC GAS DISPOSITION FILES YEAR: 2002 FACILITY: PBU GC 1 OPERATOR: BP EXPLORATION (AIASKA) IN C Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 01/2002 GATHERING CENTER 1 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 13,647 /' 4. Flared or vented greater than 1 hour 0 / (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 28,113 6. Used for lease operations Fuel / 1,001,996 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 1,043,756 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 70,191,618 Remarks: I hereby cel) :hat thetregOing ,iþtrue and correct to the best of my knowledge. Signature: .c\ _ Å.A A_A. ',. Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure 0 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT JANUARY, 2002 Page 1 tunplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTIOWOFINCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 1/1/2002 0709-0722 90 Not required for unplanned events which Not required for unplanned events whi 1/4/2002 2311-2325 49 are less than or equal to 1 hour are less than or equal to 1 hour 1/6/2002 2039-2045 208 1/9/2002 1650-1658 83 1/9/2002 2340-2355 156 1/11/2002 1751-1834 486 Intermittent 1/12/2002 1832-1838 208 1/15/2002 0528-0534 42 1/15/2002 2224-2314 868 1/16/2002 0201-0108 208 1/16/2002 0455-0525 188 1/19/2002 2219-2226 486 1/20/2002 1110-1119 313 1/23/2002 0956-1055 6,433 1/24/2002 2150-2154 33 1/25/2002 1527-1611 125 Intermittent 1/25/2002 1719-1803 275 1/27/2002 1304-1330 542 1/28/2002 1003-1046 597 1/28/2002 1551-1630 1 ,165 1/29/2002 1421-1444 240 1/29/2002 1630-1641 69 1/29/2002 1850-1906 200 1/30/2002 0718-0814 583 TOTAL 13,647 ¡Unplanned Events greater than 1 hour DATE TIME VOLUME TOTAL DESCRIPTION OF INCIDENT & CAUSE See attachments o ACTION TAKEN TO ELIMINATE CAUSE See attachments tPlanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments tPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour & not exceeding 5.000 MCF Planned Events> 1 hour and exceeding 5.000 MCF Pilot Purge Assist TOTAL FLARED VOLUME ACTION TAKEN TO ELIMINATE CAUSE See attachments TOTAL 13,647 o o o GPB Flaring incident Subject: GPB Flaring incident Date: Sat, 26 Jan 2002 00:00:31 -0600 From: "Bolkovatz, Mike J" <BolkovMJ@BP.com> To: "Steve McMains (E-mail)..<steve_mcmains@admin.state.ak.us> CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>, "Pfeiffer, Jim A" <PfeiffJA@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com> To: Steve McMains, AOGCC steve mcmains@admin.state.ak.us 907-793-1241, fax 907-276-7542 From: Michael Bo1kovatz, GPB Prod Optim Team Leader, 907-659-5566 This note is to inform you of a flaring incident which occurred on January 23, 2002. At 09:52, GC3 started flaring because CGF booster compressors 1801, 1802, and 1857 shutdown. At 09:56, the flare relief valve at GC1 opened. Booster 1802 shutdown due to an exhaust gas temperature problem. Then, booster 1801 shutdown because of vibration problems when 1802 shutdown. Then, booster 1857 shutdown because of a fuel control problem. The WOA immediately started reducing productionrates and shutin 1141 MMSCF. The EOA immediately started reducing production and shut in 1000 MMSCF. This gas cut was enough to lower the gas transit header pressure to stop flaring. GCl flared a total of 6,433 MSCF for 59 minutes, and GC3 flared a total of 7,697 MSCF for 1 hr, 8 minutes. Due to the significant amount of production (approximately 60 wells) that had to be shutin in order to reduce the pressure enough to close the flare relief valve, the flaring event at GC3 lasted over 1 hr. Because of the gas piping hydraulics, the pressure at GCl was reduced sooner and they were able to stop flaring in just under 1 hr. Please don't hesitate to call me with any questions. Michael Bolkovatz GPB Production Optimization TL 659-5566 1 of 1 1/26/028:33 AM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 02/2002 GATHERING CENTER 1 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 19,720 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 28,402 6. Used for lease operations Fuel 944,717 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 992,839 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 62,490,152 Remarks: I hereby cefj'.tð thtoregOing i true and correct to the best of my knowledge. Signature: ....{ . 1 of ^^" r 0... Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 100.00% 640150 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Page 1 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT FEBRUARY, 2002 unPlanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/1/2002 1322-1354 667 Not required for unplanned events which Not required for unplanned events whi 2iii2ûû2 i4i9-1448 705 are less than or equal to 1 hour are less than or equal to 1 hour 2/3/2002 1409-1425 167 2/4/2002 1103-1202 2,049 2/5/2002 1643-1653 139 2/7/2002 1356-1433 95 Intermittent 2/13/2002 1711-1716 347 2/17/2002 0108-0119 764 2/18/2002 0417-0424 486 2/18/2002 0539-0546 486 2/20/2002 1124-1130 146 2/22/2002 0448-0506 1 ,250 2/22/2002 0837-0843 146 2/22/2002 0857-0903 146 2/22/2002 0915-0926 840 2/22/2002 1027-1036 625 2/24/2002 1352-1442 10,472 2/24/2002 1403-1420 190 TOTAL 19,720 ~Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments o ACTION TAKEN TO ELIMINATE CAUSE See attachments TOTAL Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO EUMINATE CAUSE See attachments Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events> 1 hour or 0 exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME 48,122 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 03/2002 I Volume MCF" GATHERING CENTER 1 Disposition 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 12,526 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 33,215 6. Used for lease operations Fuel 1,013,965 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 1,059,706 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 69,323,961 Remarks: I hereby ce".t~t tnfOregOingJltrue and correct to the best of my knowledge. Signature: . '1 A .. ^"'^ I, Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT MARCH, 2002 Page 1 JUnplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 3/2/2002 1724-1731 486 Not required for unplanned events which 3/4/2002 0900-0916 222 are less than or equal to 1 hour 3/11/2002 2123-2221 5,035 3/12/2002 0020-0112 4,514 3/16/2002 1652-1702 694 3/17/2002 0715-0720 69 3/17/2002 0755-0820 608 0321-02 1509-1525 122 3/22/2002 2047-2052 42 3/24/2002 2036-2042 46 3/30/2002 0140-0213 688 TOTAL 12,526 lunplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments o TOTAL Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events whil are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 12,526 o o o TOTAL FLARED VOLUME 45,741 I ACTION TAKEN TO ELIMINATE CAUSE See attachments Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 04/2002 GATHERING CENTER 1 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 6,158 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 32,955 6. Used for lease operations Fuel 983,821 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 1,022,934 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 66,496,295 Remarks: I hereby certV~ITe tegOing is tr~ö and correct to the best of my knowledge. Signature: . . 1. A ^". .h Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT April 2002 Page 1 lunplanned Events less than or equal to 1 hour DATE TIME' VOLUME 'DESCFtIPTIONOFfNc:IOENT"&!CAU$e 4/1/2002 1644-1651 180 Not required for unplanned events which 4/2/2002 0040-0105 260 are less than or equal to 1 hour 4/7/2002 2336-2400 250 4/8/2002 0000-0009 75 4/8/2002 0150-0230 1,250 4/8/2002 0456-0512 225 4/8/2002 0847-0913 361 4/1 0/2002 1417-1423 417 4/12/2002 1617-1624 49 4/12/2002 2015-201 g 22 4/12/2002 2204-2209 28 4/13/2002 1000-1007 49 4/17/2002 0250-0256 33 4/18/2002 0941-0954 45 4/21/2002 0829-0851 275 4/21/2002 2236-2254 125 4/23/2002 0529-0536 486 4/24/2002 0310-0318 556 4/24/2002 0337-0344 486 4/24/2002 1136-1206 313 4/25/2002 0711-0718 73 4/25/2002 1039-1125 479 4/26/2002 1535-1547 83 4/27/2002 0323-0332 38 TOTAL 6,158 'unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT &! CAUSE See attachments TOTAL o ACTION TAKEN TO ELIMINATE CAUSE See attachments 'Planned Events Less Than or Equal 1 Hour AND Not Exceedinp 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events whi, are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments 'Planned Events ExceedinQ 1 Hour OR Exceeding 5000 Mct DATE . TIME . VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist o o o TOTAL FLARED vOLUME 39,113 ACTION TAKEN TO ELIMINATE CAUSE See attachments Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 10perator IField(s) IMonth/Year of Disposition I BP EXPLORATION, ALASKA IWESTERN OPERATING AREA-PBU I OS/2002 GATHERING CENTER 1 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. ( q'5~ ~ 4. Flared or vented greater than 1 hour 5450 (Supplemental report required - See 20 AAC 25.235) ~ 5. Pilot and Purge 34,152 6. Used for lease operations Fuel 957,277 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 . 7 998,831 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 67,160,825 Remarks: I hereby certD ~Õ~ thrOregOing is l~e and correct to the best of my knowledge. Signature: 'J. 1 .J . A Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. , Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety q45D MCF ð'.ß./'2.- 2. Lease Use MCF 3. Conserv. Purposes MCF cb;~ jL Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT· GC·1 GAS FLARING INCIDENT REPORT May 2002 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 5/3/2002 0307-0317 350 Not required for unplanned events which 5/3/2002 2219-2224 175 are less than or equal to 1 hour 5/4/2002 1037 -1046 469 5/9/2002 1202-1210 83 5/9/2002 1257 -1302 52 5/12/2002 0937 -1003 90 5/12/2002 1040·1102 76 5/13/2002 0541·0545 14 5/13/2002 0623-0634 38 5/14/2002 1109-1115 63 5/14/2002 1248·1259 115 5/19/2002 1458·1508 175 5/22/2002 0851-0858 53 5/22/2002 0944-0953 38 5/24/2002 1732-1748 133 5/27/2002 2151-2156 28 5/29/2002 1742-1815 3,900 Page 1 TOTAL 5,852 unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 5/29/2002 1815-1938 1 ,550 See attachments ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour TOTAL 1,550 ¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL 5,852 1,550 o o TOTAL FLARED VOLUME 41,554 ACTION TAKEN TO ELIMINATE CAUSE See attachments 6/6/2002 1:02PM REPORT NO: 02-0334 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 29 May 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 17:42 18:15 OHrs 51 Mins D D D 3,900 MSCF 18:15 19:38 1 Hrs 23 Mins D D D 1,550 MSCF TOTAL VOLUME 5,450 MSCF First Determination of Cause: 1. High gas transit line pressure caused by CGF compressor problems due to 1885 Tandem shutdown when 1801 & 1802 Boosters were unloaded for maintenance. 2. Sk-18 IP compressor loading problem associated with suction knockout drum high pressure. Action Taken to Stop Flaring: 1. WOA reduced production rates equaling 350 mmscfd. EOA reduced production rates equaling 800 mmscfd. Wells were shut-in or choked back starting at 1735 hours. 2. Reloaded compressor Sunday, June 02, 2002 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 06/2002 GATHERING CENTER 1 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 10,476 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 33,068 6. Used for lease operations Fuel 884,184 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 927,728 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 65,177,695 Remarks: I hereby ceU~ot t~ fOregOi~] is true and correct to the best of my knowledge. Signature: . 1 A""'" It Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC·1 GAS FLARING INCIDENT REPORT June 2002 Page 1 unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 6/2/2002 0717-0752 340 Not required for unplanned events which 6/2/2002 1409-1416 97 are less than or equal to 1 hour 6/6/2002 1137 -1152 260 6/8/2002 0824·0906 1,458 6/11/2002 0551-0556 35 6/13/2002 1641-1657 222 6/14/2002 2043-2050 486 6/14/2002 2052-2059 486 6/15/2002 1057-1128 431 6/15/2002 1549-1608 198 6/15/2002 1801-1823 2,292 6/20/2002 0405-0410 21 6/21/2002 1522-1543 94 6/21/2002 2239-2300 146 6/26/2002 0049-0125 1,500 6/28/2002 0327-0346 1,319 6/29/2002 0307-0320 903 6/29/2002 0335-0344 188 TOTAL 10,476 ~Unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL o Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOL.UME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ~Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 10,476 o o o 43,544 ACTION TAKEN TO ELIMINATE CAUSE See attachments 7/9/2002 10:46 AM Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 07/2002 GATHERING CENTER 1 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 1,867 4. Flared or vented greater than 1 hour 5,430 L./ (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 30,706 6. Used for lease operations Fuel 1,058,260 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 1,096,263 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 50,527,292 Remarks: I hereby ce" t'ö, th~regOing i~ prue and correct to the best of my knowledge. Signature: . . ~ A.III'U, ø. Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1 . Safety 5)430 MCF ðß,.e... 2. Lease Use MCF 3. Conserv. Purposes MCF ~~.q:~r& ~. Commissio~er -0 9f(~\~ Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT July 2002 Page 1 Unplanned Events less than or equal to 1 hour 7/2/2002 7/10/2002 7/14/2002 7/14/2002 7/15/2002 7/22/2002 7/24/2002 7/25/2002 1214-1234 1111-1142 0422-0444 0807-0832 1703-1726 0839-0853 1726-1750 0043-0110 208 Not required for unplanned events which 350 are less than or equal to 1 hour 153 260 240 39 167 450 Not required for unplanned events which are less than or equal to 1 hour TOTAL 1,867 7/14/2002 7/16/2002 7/16/2002 1527-1753 0710-0847 1015-1316 2,535 See attachments 1,010 1,885 See attachments TOTAL 5,430 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct See attachments o See attachments TOTAL Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME See attachments o See attachments TOTAL 1,867 5,430 o o 8/12/2002 2:42 PM 38,003 REPORT NO: 02-0441 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 14 Jut 2002 TIME OF FLARING Black SYSTEM Start Stop Duration Intermittent Smoke Planned VOLUME 1. Flare/Relief Valve 04:22 04:44 OHrs 22 Mins 0 0 0 153 MSCF 2. Flare/Relief Valve 08:07 08:32 OHrs 25 Mins 0 0 0 260 MSCF 3. Flare/Relief Valve 15:27 17:53 2Hrs 26 Mins 0 0 0 2,535 MSCF TOTAL VOLUME 2,948 MSCF First Determination of Cause: 1. Due to rising transit line pressure, D bank flare valve opened. 2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 4°F. 3. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 5°F. Action Taken to Stop Flaring: t\. 1. Three wells equal to 100mmscfpd gas rate, chokes were reduced to minimum. Flaring stopped. ~duced production rates equaling 130 mmscfd. Wells were shut-in or choked back starting at _. ~urs. 3. WOA reduced production rates equaling 250 mmscfd. EOA reduced production rates equaling 280 mmscfd. Wells were shut-in or choked back starting at 1330 hours. Monday, July 22, 2002 Page 1 of 1 REPORT NO: 02-0449 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 16 Jul2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 07:10 08:47 1 Hrs 37 Mins 0 0 0 1,010 MSCF 10:15 13:16 3Hrs 1 Mins ~ 0 0 1 ,885 MSCF TOTAL VOLUME 2,895 MSCF First Determination of Cause: 1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 1 O°F. 50-60 2. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 10°F. 70-82 Action Taken to Stop Flaring: 1. WOA reduced production rates and shut-in 20 wells equaling 180 mscfd. EOA reduced production rates s equaling 375 mmscfd. Wells were shut-in or choked back starting at 0615 hours. 2. WOA reduced production rates equaling 600 mmscfd. Wells were shut-in or choked back starting at 0830 hours. Monday, July 22, 2002 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 08/2002 GATHERING CENTER 1 Disposition Volume MCF" 0 0 6,416 ./ 8,162 35,707 1,676,775 0 0 1,727,060 0 0 0 57,562,135 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour. 4. Flared or vented greater than 1 hour Su plemental report required - See 20 AAC 25.235) 5. Pilot and Purge 6. Used for lease operations Fuel Assist 7. Other Lift Gas, Off Field TOTAL items 1 - 7 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: CCP Remarks: true and correct to the best of my knowledge. Title: SUPERVISOR Signature: Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety CD I b Z-MCF :5ßt2- I 2. Lease Use MCF 3. Conserv. Purposes MCF ~ %'/oy Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Page 1 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC·1 GAS FLARING INCIDENT REPORT August 2002 Unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION?O¡::JNCIt:>J;Nl"&' CAUSE 8/8/2002 0146-0206 194 Not required for unplanned events which 8/9/2002 2324-2400 525 are less than or equal to 1 hour 8/10/2002 0000-0014 175 8/10/2002 0740-0810 417 8/10/2002 1615-1628 108 8/11/2002 1321-1345 200 8/18/2002 0353-0445 1,083 8/19/2002 1425-1438 108 8/23/2002 1050-1058 56 8/25/2002 1508-1522 39 8/27/2002 0740-0805 174 8/27/2002 0935-0948 81 8/28/20021108-1148 2,083 8/29/2002 2005-2036 323 8/29/2002 2008-2040 600 8/30/2002 0307-0316 250 TOTAL ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour J f'Jd- e..w4~ \t\~ -k, JJ.t/"rIA-l."\<? l f ~~ r~~ ~ le~_'~ i ~ ~~ 6,416 ~UnPlanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 8/3/2002 1020-2348 4,996 See attachments 8/4/2002 0430-2352 3,166 TOTAL ACTION TAKEN TO ELIMINATE CAUSE See attachments 8,162 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE .. TIME VOI£UM£ . DESCRIPTIQli ?O¡::'fNCIt:>£NT'&CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments Planned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIt:>ENT"& CAUSE See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME ACTION TAKEN TO EUMINATE CAUSE See attachments TOTAL 6,416 8,162 o o 50,285 9/1112002 2:52 PM REPORT NO: 02-0516 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 03 Aug 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 10:20 23:48 13 Hrs 28 Mins Black Intermittent Smoke o 0 Planned VOLUME o 4,996 MSCF TOTAL VOLUME 4,996 MSCF First Determination of Cause: 1. Sk-18 IP compressor K-107 shut down because of a problem associated with the newly installed discharge valve malfunction. Action Taken to Stop Flaring: 1. This problem was actually discovered during a plant restart operation. K-107 was started as normal during this plant re-start, and a problem was discovered as the plant rate was brought up, and after several hours of trouble shooting effort, Le., checking for valves in wrong position, cooler bay hydrates, etc, the problem was isolated to a newly installed discharge valve which was inadvertently installed in the closed position (confirmed by temperature differential and X-ray readings). A plan was formulated and valve reps, as well as local maintenance techs, where used to remove the actuator and re-position it so that the discharge could then function properly. During this process, we sorted highest GOR wells flowing to GC-1 and reduced gas rate through plant to minimize gas flaring. Valve actuator was repositioned, allowing valve to fully open, K107 began to move gas and flaring stopped. VVednesday,August21,2002 Page 1 of 1 REPORT NO: 02-0518 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 04 Aug 2002 SYSTEM 1. Flare/Relief Valve TIME OF FLARING Start Stop Duration 04:30 23:52 19 Hrs 29 Mins Black Intermittent Smoke D D Planned VOLUME D 3,166 MSCF TOTAL VOLUME 3,166 MSCF First Determination of Cause: 1. Sk-18 LP compressor shut down because of a problem associated with temperature of the LP gas with rates cut. The molecular components of said gas will not allow the heavy ends to fall out and allow the compressor to bite. Flaring with assist gas thru V-136 to prevent black smoke. Action Taken to Stop Flaring: 1. VVednesday,August21,2002 Page 1 of 1 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 09/2002 GATHERING CENTER 1 Disposition Volume MCF" 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 1,466 4. Flared or vented greater than 1 hour 58,650 ;/ (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 35,288 6. Used for lease operations Fuel 804,091 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 899,495 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 67,901,284 Remarks: I hereby ce1J ot t~ foregoirJ is true and correct to the best of my knowledge. Signature:. .0 J A"'" Ú Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety LISD MCF .$~ 2. Lease Use 5'7 :pD MCF Jig¡2- I 3. Conserv. Purposes MCF J ð{( ~AQ 'y Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOEBAYUNIT-GC~ GAS FLARING INCIDENT REPORT September 2002 Page 1 \ l~nplannedEventslessthanorequal to 1, ~~ur \~ 'ii"¡iºI~,ª¡iil!iiii¡ii¡iiil!i¡,!!il!iilin;!M,ªI¡ii¡'¡iiiii'ii¡iili~~~~Mr;¡"!!!;¡¡iº,ª~C;;~I~rl~~III~I'~C;;Iºr;~r'~I(Þ~~$1!P l!!:Î,,¡e,J "~ 9/4/2002 1311-1327 ~.9)Jot required for unplanned eventsll'\lhi~h I~ 9/7/2002 0544-0619 365 are less than or equal to 1 hour 9/7/2002 1456-1517 150 :~~~~~~~~ ~:~;~~~~~ ~ ~ì'p/()fkck¡ ~ 9/28/2002 1827 -1858 538 tb1" \ ;4thìt;-:t TOTAL Unplanned Events greater th n 9/4/2002 9/10/2002 1457-1629 0849-1003 \\~\ -...J:~ )2JI~/u"L- 1 ,150 See attachments -!)0:!.:.~ (û~' ;r (Ö(pC .1.1 '~<t TOTAL 5~ J~ì7 Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DArE 'TIME ' , , , 'VOLUME' DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 , ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour See attachments -.ßI~ 1~(lclo"C- , ACTION TAKEN TO ELlMINA,Tr; CAUSE See attachments J Iplanned Events Exceeding 1 Hour OR Exceeding 5000 Mct , DATE TIME"", VOLUME" DESCRIPTION OF INCI()ENT& CAUSE See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME l \ q,q ~C:¡17 CJg~ I z( ,~/ ()~ ~ o o 95,404 , ACTION TAKEN TO ELIMINATE CAUSE See attachments 10/4/2002 2:31 PM REPORT NO: 02-0609 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 04 Sep 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 13:11 13:27 OHrs 16 Mins 0 0 0 100 MSCF 14:57 16:29 1 Hrs 32 Mins 0 0 0 1,150 MSCF TOTAL VOLUME 1 ,250 MSCF First Determination of Cause: 1. High ambient temperature swings resulted in flaring and required cuts in production. Ambient temperature increased by 20°F (55°F). "'-.\ 2. High ambient temperature swings resulted in high transit line pressure and flaring. Production cuts did not stop flaring until production bank was shutdown. Ambient temperature increased by 20°F (65°F) and transit line was 20psi over normal. Action Taken to Stop Flaring: 1. WOA reduced production rates equaling 100 mmscfd. Wells were shut-in or choked back starting at 1315 hours. 2. WOA reduced production rates and shut-in many wells equaling 450 mmscfd. EOA reduced production rates and shut-in many wells equaling 140 mmscfd. Wells were shut-in or choked back starting at 14:45 hours. Wednesday, September 25,2002 Page 1 of 1 REPORT NO: 02-0638 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 10 Sep 2002 SYSTEM 1. Flare/Relief Valve 2. FlarelRelief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 08:37 08:53 OHrs 16 Mins D D D 167 MSCF 08:49 10:03 1 Hrs 14 Mins D D D 57,500 MSCF TOTAL VOLUME 57,667 MSCF First Determination of Cause: 1. In preperation of GC1 Annex flare tip test, CCP backed down to raise gas transit line pressure, which caused flaring. 2. GC1 Annex flare capacity test to test recent modifications to the flare system. Notified AOGCC of test for verbal approval. Action Taken to Stop Flaring: 1. GC1 Annex started flare test and transit line pressure decreased. 2. Test completed and rates returned to normal Wednesday, September 25,2002 Page 1 of 1 GPB Flaring Incidents Subject: GPB Flaring Incidents Date: Tue, 10 Sep 2002 22:59:59 -0500 From: "GPB, Prod Opt TL" <GPBProdOptTL@BP.com> To: 'steve _ mcmains@admin.state.ak.us' CC: "Fiedler, Anne M" <FiedleAM@BP.com>, "Benson, Gary A" <BensonGA@BP.com>, "Pfeiffer, Jim A" <PfeiffJA@BP.com>, "GPB, Environ Advisor West" <GPBEnvironAdvisorWest@BP.com>, "GPB, Environ TL" <GPBEnvironTL@BP.com>, "GPB, Environ Advisor East" <GPBEnvironAdvisorEast@BP.com> > > > > > > Leader, 907-659-5566 > To: Steve McMains, AOGCC steve mcmains@admin.state.ak.us 907-793-1241, fax 907-276-7542 From: Michael Bolkovatz, GPB Prod Optim Team As we discussed yesterday, an extended flare incident occurred during field testing of the newly installed flare tip at the GC1 Annex. The test was to determine if the flare is actually capable of operating at its design conditions to ensure safe operations. The test started at 08:49 and lasted until 10:03 and a total volume of 57,500 MSCF was flared. The test was successful; ie, the flare performed up to design specifications. > > hesitate to call me. > If you require additional information, please don't Michael Bolkovatz GPB Production Optimization TL 659-5566, 659-4472 Facility ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) MonthNear of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 10/2002 GATHERING CENTER 1 Disposition Volume MCP 1. Sold 0 2. Reinjected 0 3. Flared or vented less than 1 hour. 6,794 4. Flared or vented greater than 1 hour 0 (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 37,468 6. Used for lease operations Fuel 964,481 Assist 0 7. Other Lift Gas, Off Field 0 TOTAL items 1 - 7 1,008,743 8. NGL gas equivalent produced 0 9. Purchased gas 0 10. Transferred from: 0 11. Transferred to: CCP 70,256,123 Remarks: I hereby cert~ that t1\...foregoin? is true and correct to the best of my knowledge. Signature: () J.. j ^'" ~l Title: SUPERVISOR Form 10-422 (Revised 4/95) "Indicate contribution of each pool to total. Pool Name Code Percent PRUDHOE 640150 100.00% 1. Safety MCF 2. Lease Use MCF 3. Conserv. Purposes MCF Commissioner Date Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC-1 GAS FLARING INCIDENT REPORT October 2002 Page 1 ¡unplanned Events less than or equal to 1 hour DATE TIME VOI.1lJME DESCRIPTION OF INCIDEN't &'CAUSE 10/1/2002 0640-0648 28 Not required for unplanned events which 10/1/2002 1957-2006 625 are less than or equal to 1 hour 10/2/2002 2055-2104 625 10/2/2002 2224-2254 417 10/2/2002 2314-2319 42 10/2/2002 2315-2324 625 10/4/2002 0707-0751 300 10/5/2002 0648-0655 50 10/6/2002 1328-1350 229 10/6/2002 1735-1755 167 1 0/7/2002 0517-0611 385 10/7/2002 1912-1924 108 10/8/2002 1055-1106 764 10/8/2002 1258-1327 201 1012-02 1117-1146 302 10/20/2002 0913-0920 243 10/27/2002 0000-0010 139 10/29/2002 0903-0934 323 10/29/2002 1145-1231 415 10/29/2002 1323-1346 160 10/30/2002 2302-2332 438 10/31/2002 0629-0634 208 TOTAL 6,794 ¡UnPlanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAOSE See attachments TOTAL o ¡Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ACTION TAKEN TO ELIMINATE CAUSE See attachments ACTION TAKEN TO ELIMINATE CAUSE See attachments ¡Planned Events Exceeding 1 Hour OR Exceeding 5000 Mct DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE See attachments TOTAL 0 Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME o o o 44,262 ACTION TAKEN TO ELIMINATE CAUSE See attachments 11/7/2002 2:58 PM Facility GATHERING CENTER 1 Disposition 1. Sold 2. Reinjected 3. Flared or vented less than 1 hour. ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION I Operator I Field(s) I MonthNear of Disposition I BP EXPLORATION, ALASKA IWESTERN OPERATING AREA-PBU 11/2002 Volume MCP "Indicate contribution of each pool to total. o Pool Name Percent Code o PRUDHOE 640150 100.00% 9,481 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 5. Pilot and Purge 6. Used for lease operations 7. Other 8. NGL gas equivalent produced 9. Purchased gas 10. Transferred from: 11. Transferred to: CCP Remarks: TOTAL items 1 - 7 I hereby ce Signature: Form 10-422 (Revised 4/95) true and correct to the best of my knowledge. Title: SUPERVISOR Fuel Assist 4,797 36,468 908,702 o Lift Gas, Off Field o 959,448 1. Safety 4:t<q-r MCF J:"I?- o MCF 2. Lease Use o 3. Conserv. Purposes MCF o Gm~OuU<~ CommisU>ner J~t -r/(J r Date 63,020,248 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 10 Nov 2002 SYSTEM TIME OF FLARING Start Stop Duration 00:36 00:45 0 Hrs 9 Mins Black Intermittent Smoke VOLUME 1. Flare/Relief Valve REPORT NO: 02-0789 Planned o o o o ~wJ.S ? c::4r-fL. ~ ,.-t'ç 0, 1L5V,3~ ¡ o ,\. ~~~ ~-4' . J First Determination of Cause: 1. High ambient temperaturr~... resulted in flaring and required cuts in production. Ambient temperature increased t::('I2°F. \ ¡ 2. High ambient temperatµre swings resulted in flaring and required cuts in production. Ambient temperature increased!by 2°F. 3. CGF swapping Tande~essors, L TS-3 out of service. 2. Flare/Relief Valve 00:51 01 :02 OHrs 11 Mins 3. Flare/Relief Valve 01 :51 02:39 o Hrs 48 Mins 4. Flare/Relief Valve 05:42 09:38 3 Hrs 56Mins o o o o o o o o 63 MSCF 76 MSCF .....,~'--, ( 500 MS~~j/) 3,697 MSCF 4,336 MSCF \Y -h ,~ I €f) ~f..rJ (/'Ir.:- Q, e-v~ I (¡vJ{}z.. ' q t Zð J q,'¿¡D~ /'IA é> /~ ) TOTAL VOLUME 4. Ambient temperature increasing along with changing out high GOR wells Action Taken to Stop Flaring: 1. WOA reduced production rates and choked back 4 wells equaling 34 mmscfd. Wells were shut-in or choked back starting at 00:36 hours. 2. WOA reduced production rates and choked back 4 wells equaling 34 mmscfd. Wells were shut-in or choked back starting at 00:51 hours. 3. No response taken as this was deemed to be of short duration. CGF would flare to help keep transit gas line pressure from getting high. 4. WOA reduced production rates and moved two wells equaling 60 mmscfd. Wells were shut-in or choked back starting at 0536 hours. Continued cutting 4 more equaling another 90mm flares finally closed. Checking setpoints on annex vessel and backpressure valve Tuesday, November 26, 2002 Page 1 of 1 REPORT NO: 02-0808 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 16 Nav 2002 TIME OF FLARING SYSTEM Start Stop Duration Intermittent 1. Flare/Relief Valve 00:10 00:58 OHrs 48 Mins D 2. Flare/Relief Valve 02:10 03:13 1 Hrs 3Mins D 3. Flare/Relief Valve 11:41 12:12 OHrs 31 Mins D Black Smoke Planned VOLUME D D 500 MSCF D D 1,100 MSCF D D (:~,306 ~.~~~.... ... TOTAL VOLUME 5,906 MSCF he}(v .f.;v'tJ -t..r ...: >J~~ First Determination of Cause: 1. Increasing ambient temperature resulted in flaring and required cuts in production. Ambient temperature increased by 3°F. 2. Increasing ambient temperature resulted in flaring and required cuts in production. Ambient \.~ . temperature increased by 10°F. ~<t<.' ~ ~.. 1.;,?(( 3. H~h gas transit line pressure caused by CGF compressor problems due to PSM testing, MI ~ ~- L/mpressor shut down and backed up L TS 1,2&3. C'(è; v ~(Þ ~1/ .,;)) Action Taken to Stop Flaring: ~~ ~... " 1. WOA reduced production rates and shut-in 4 wells equaling 60 mmscfd. EOA reduced production ~ rates equaling 90 mmscfd. Wells were shut-in or choked back starting at 0010 hours. 2. WOA reduced production rates equaling 300 mmscfd. EOA reduced production rates equaling 200 mmscfd. Wells were shut-in or choked back starting at 0115 hours. 3. WOA reduced production rates and shut-in 22 wells equaling 375 mmscfd. EOA reduced production rates and shut-in 15 wells equaling 500 mmscfd. Wells were shut-in or choked back starting at 11:44 hours. Tuesday, November 26, 2002 Page 1 of 1 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT· GC-1 GAS FLARING INCIDENT REPORT November 2002 Page 1 IUnplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE 11/9/2002 2153-2206 90 Not required for unplanned events which 11/9/2002 2227-2244 177 are less than or equal to 1 hour 11/10/2002 0036-0045 63 11/10/2002 0051-0102 ~ ' 11/10/2002 0151-0239 500,)--> -h€c'1-Ío CQç:: <A..,e,.~;- , 11/11/2002 1319-1329 ~ vi cl<JJ~~.. >\ hf2... 11/12/2002 2037-2121 306 11/16/2002 0010-0058 ~/ 11/16/2002 1141-1212 . ,3'ö6 . ;:> 11/17/2002 0806-0837 . , 4 11/24/2002 2223-2230 97 11/30/2002 1619-1628 213 ACTION TAKEN TO ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour ~ f, e¿i ~ C G-F .eN-i...* vJI ct.(,v~~ > I ~ 9~ L.ln-f 6'( J I""- . A ::ß? -z{ -z;¡f o-z- TOTAL lunplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE 11/10/2002 0542-0938 3,697 See attachments 11/16/20020210-0313 1,100 ACTION TAKEN TO ELIMINATE CAUSE See attachments (¥i.V'~~) 4,797 ,+ %0'" "'", 1(,03 µ.eç. 3Ble jZ(27{v~ TOTAL Iplanned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Met DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments IPlanned Events Exceeding 1 Hour OR Exceeding 5000 Met DATE TIME VOLUME DESCRIPTION OF INCIDENT" CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist 4,797 o o 12/9/2002 11:10 AM TOTAL FLARED VOLUME 50,746 GATHERING CENTER 1 ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION Operator Field(s) Month/Year of Disposition BP EXPLORATION, ALASKA WESTERN OPERATING AREA-PBU 12/2002 Facility Disposition Volume MCF" "Indicate contribution of each pool to total. 1. Sold o Pool Name Code Percent 2. Reinjected o PRUDHOE 640150 100.00% 3. Flared or vented less than 1 hour. 9,552 4. Flared or vented greater than 1 hour (Supplemental report required - See 20 AAC 25.235) 3,438 5. Pilot and Purge 37,465 6. Used for lease operations Fuel Assist 974,536 o 7. Other Lift Gas, Off Field o TOTAL items 1 - 7 1,024,991 1. Safety 3,4-3ß MCF -Y3P-- 8. NGL gas equivalent produced o 2. Lease Use MCF 9. Purchased gas o 3. Conserv. Purposes MCF 10. Transferred from: o J-!tO!03 Date 11. Transferred to: CCP 72,821,544 Signature: Form 10-422 (Revised 4/95) is true and correct to the best of my knowledge. Title: SUPERVISOR Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60 degrees F. Report due by the 20th of the month following the month of disposition. Authority 20 AAC 25.235. Remarks: REPORT NO: 02-0894 BPXA FLARE REPORT PRUDHOE BAY FACILITY: GC1 DATE: 25 Dec 2002 SYSTEM 1. Flare/Relief Valve 2. Flare/Relief Valve TIME OF FLARING Black Start Stop Duration Intermittent Smoke Planned VOLUME 11:59 12:18 OHrs 19 Mins 0 0 0 1,319 MSCF 13:25 16:10 2Hrs 45 Mins 0 0 0 3,438 MSCF v TOTAL VOLUME 4,757 MSCF First Determination of Cause: 1. LPS compressor K-7001 shut down because of control/instrumentation failure associated with a faulty pic 2. LPS compressor K-7001 & K-7001shut down because of control/instrumentation failure associated with a faulty PLC/Power supply Action Taken to Stop Flaring: 1. WOA reduced production rates and shut-in 14 wells equaling 200 mmscfd. Wells were shut-in or choked back starting at 12:00 hours. 2. WOA reduced production rates and shut-in all LP wells equaling 400 mmscfd. Wells were shut-in or choked back starting at 11 :59 hours. Monday, December 30,2002 Page 1 of 1 BP EXPLORATION (ALASKA) INC. PRUDHOE BAY UNIT - GC·1 GAS FLARING INCIDENT REPORT December 2002 Page 1 unplanned Events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTIONOFINCIDENT<&CAUSE 12/2/2002 0144-0153 625 Not required for unplanned events which 12/3/2002 2308-2312 31 are less than or equal to 1 hour 12/3/2002 2330-2400 3,958 12/4/2002 1729-1742 108 12/4/2002 0000-0012 833 12/8/2002 1652-1658 417 12/11/2002 0329-0345 78 12/12/2002 2302-2315 217 12/13/2002 0248-0255 243 12/17/2002 2045-2055 76 12/20/2002 1723-1745 115 12/21/2002 1419-1428 94 12/23/2002 0712-0730 250 12/24/2002 0739-0800 146 12/24/2002 1412-1424 83 12/25/2002 1159-1218 1,319 12/29/2002 0338-0344 417 12/31/2002 0651-0659 56 12/31/2002 1225-1232 486 TOTAL 9,552 unplanned Events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE 12/25/2002 1325-1610 3,438 See attachments ACTIONTAKEN·TO·ELIMINATE CAUSE Not required for unplanned events which are less than or equal to 1 hour TOTAL 3,438 Planned Events Less Than or Equal 1 Hour AND Not Exceeding 5000 Mcf DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO ELIMINATE CAUSE See attachments JPlanned Events Exceeding 1 Hour OR Exceeding 5000 Mcf DATE TIME VOLUME DESCRIÞ110NOf'INCIDENT & CAUSE See attachments TOTAL 0 ACTION TAKEN TO EUMINATECAUSE See attachments Unplanned Events < 1 Hour Unplanned Events> 1 Hour Planned Events < 1 hour and not exceeding 5,000 MCF Planned Events> 1 hour or exceeding 5,000 MCF Pilot Purge Assist TOTAL FLARED VOLUME TOTAL 9.552 3,438 o o 50,455 ACTION TAKEN TO ELIMINATE CAUSE See attachments 1/10/2003 3:17PM